Notice of Meeting and Agenda 
Midlothian Council 
Venue:  Virtual Meeting, 
Date:  Tuesday, 23 August 2022 
Time:  11:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone: 
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.Midlothian.gov.uk 
Page 1 of 340

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
4          Deputations   
5          Minutes
5.1 PUBLIC  MINUTE Midlothian Council for Approval  28 June 2022 5 - 26
5.2 PRIVATE MINUTE Midlothian Council for Approval  28 June 2022 
5.3 Action Log- Council 23 August 2022 27 - 30 
6          Questions to the Council Leader 
7          Motions
7.1 Motion - Standing up for Responsible Tax Conduct_Redacted 31 - 34 
8          Public Reports
8.1 Housing Revenue Account Revenue Budget and Capital Plan
2022_23 Report by Chief Office Corporate Solutions
35 - 42
8.2 Annual Treasury Management Outturn 2021-22 Report by Chief
Officer Corporate Solutions
43 - 74
8.3 General Services Capital Plan_2022_23 Quarter 1 Monitoring by
Chief Officer Corporate Solutions
75 - 84
8.4 Financial Monitoring 202223 – General Fund Revenue Report by
Chief Officer Corporate Solutions
85 - 96
8.5 Medium Term Financial Strategy - 2023/24 to 2027/28 Report by
Chief Officer Corporate Solutions
97 - 120
Page 2 of 340

Page 3

8.6 Scottish Parliament  Finance and Public Administration Committee_
Pre-Budget Scrutiny Call for Views Report by Chief Officer
Corporate Solutions
121 - 132
8.7 Risk Management Strategy Report by Chief Officer Place 133 - 150
8.8 National Care Service (Scotland) Bill Report by Principal Solicitor 151 - 156
8.9 (Abortion) Buffer Zone Consultation Response Report by Executive
Director Place
157 - 170
8.10 Appointment of Representatives to Outside Bodies - Scottish Joint
Council_July 2022 Report by Executive Director Place
171 - 174
8.11 Appointment of Representatives to Outside Bodies - Scotland Excel
Joint Committee Report by Executive Director Place
175 - 178
8.12 Wheelchair Accessible Housing Targets Report by Executive
Director Place
179 - 206
8.13 Rapid Rehousing Transition Plan 2022-23_ 2024-25 Report by
Chief Officer Place
207 - 286
8.14 Trauma Informed practice development in Midlothian report by
Head of Adult Services
287 - 334
8.15 Additions to Family Leave - Pregnancy Loss Pledge and Fertility
Treatment Leave Report by Chief Officer Corporate Solutions
335 - 340 
9          Private Reports
9.1 Acquisition of Office and Industrial Investment at Hardengreen One
and Two, Eskbank, Dalhousie Road, Dalkeith, EH22 3NX Report by
Executive Director Place
• 6. Information relating to the financial or business affairs of any particular
person (other than the authority). 
9.2 Easthouses Primary School – Audit Report by Chief Executive
• 6. Information relating to the financial or business affairs of any particular
person (other than the authority). 
9.3 Learning Estate Investment Plan 3 Bids Report by Executive
Director Children, People & Partnerships
• 6. Information relating to the financial or business affairs of any particular
person (other than the authority). 
10    Date of Next Meeting 
The next meeting will be held on 4th October 2022 
Page 3 of 340

Page 4

Page 4 of 340

Page 5

Minute of Meeting 
Midlothian Council 
Date Time Venue
28 June 2022 11.00 am via MS Teams 
Present: 
Provost McCall (Chair) Depute Provost McManus
Councillor Parry – Council Leader Councillor Cassidy  – Depute Council
Leader
Councillor Alexander Councillor Bowen
Councillor Drummond Councillor Imrie
Councillor McEwan Councillor McKenzie
Councillor Milligan Councillor Pottinger
Councillor Russell Councillor Scott
Councillor Smaill Councillor Virgo   
In attendance: 
Dr Grace Vickers, Chief Executive  Morag Barrow, Joint Director Health and
Social Care
Gary Fairley, Chief Officer Corporate
Solutions
Alan Turpie, Legal and Governance
Manager/Monitoring Officer
Marc Bedwell Executive Business
Manager
Michelle Strong executive Chief
Operating Officer Education
Derek Oliver, Chief Officer Place Sinead Urquhart Executive Business
Manager
Annette Lang Strategic Services Re-
Design Manager
Nick Clater, Head of Adult & Social Care
Saty Kaur, Executive Business
Manager
Fiona Clandillon Head of Development
Lynn Cochrane Communications Team
Leader
David Gladwin Financial Services
Manager
William Venters Principal Solicitor 
Marco Reece-Heel Business Analyst Myra Forsyth Quality and Scrutiny
Manager
Gareth Davies Senior Manager
Property and Facilities
Ross Morrison Senior Project Manager 
Mrs Elizabeth Morton – Religious
Representative 
Item 5.1
Page 5 of 340

Page 6

2
Ross Neill, Democratic Services Team
Leader
Janet Ritchie , Democratic Services
Officer 
1.  Welcome and Apologies for Absence 
The Provost welcomed everyone to the meeting reminding all that it was a public
meeting being webcast live. 
Apologies for absence were intimated on behalf of Councillor Winchester and Curran
also Mrs Lawrie Religious Representative to the Cabinet. 
2. Order of Business 
The Provost advised the order of business change the withdrawal of item 8.18 and
the addition of an Emergency Motion 7.3, all other business as per the agenda. 
Councillor Parry raised the issue of publicising aspects of the report on the private
agenda at 9.2 as soon as possible. In that regard Mr Alan Turpie advised that
depending on today’s Council decision, the confidential aspect of some information
may be removed and that information could then be made publically available 
3. Declarations of interest 
None 
4. Deputations 
None received. 
5. Minute of Previous Meeting 
No.  :
5.1  Minute Volume  Executive Director Place
Questions to Officers
Accepted as a clear and fair record 
Public Minute Volume 
Private Minute Volume 
Private Appeal Minute June 2021 
Proposed Councillor Parry
Seconded Councillor McKenzie 
Decision
Approved 
Action
All to Note  Page 6 of 340

Page 7

3 
Meeting  Date Held 
Audit Committee 14 March 2022
Performance Review and Scrutiny
Committee 
12 March 2022
Police Fire and Rescue Board 21 February 2022
General Purposes Committee 15 March 2022
4.1.1 Private Addendum to Minute of
Meeting of the General Purposes
Committee
15 March 2022
Planning Committee 15 March 2022
Local Review Body 22 February 2022
Special Local Review Body 21 March 2022 
Private Business Transformation
Steering Group 
7 March 2022 
No.  :
5.2 Action Log Update Executive Director Place
Questions to Officers 
All members were satisfied the action log was up to date and in order 
Decision
All to Note
Action
None 
6. Question to the Leader of the Council 
None 
7. Notices of Motion 
Report
No.
Report Title Report by:
7.1 Renaming of Penicuik Park Proposed by Councillor
Willie McEwan 
Seconded by Councillor
Russell Imrie
Outline of report and summary of discussion
The Council recognises the contribution that former Councillor ADAM
MONTGOMERY made to both Lothian Region and Midlothian Council over many
years of public service and seeks to commemorate his long standing record to
Midlothian in general and to Penicuik in particular by renaming Penicuik Park to
become known as MONTGOMERY PARK, and request that officers carry out the
necessary actions to have the Park renamed. 
Page 7 of 340

Page 8

4
Proposed by Cllr McEwan
Seconded by Cllr Imrie 
Various members spoke of former Councillor Montgomery, their memories, the
contribution he made and his valued service to the people of Midlothian 
Unanimously Approved 
Decision
To rename Penicuik Park to Montgomery Park
Action
Executive Director Place 
Report
No.
Report Title Report by:
7.2 Council to recognise Pride Month
annually in June with the Progress
Pride flag
Proposed by Councillor 
Connor McManus 
Seconded by Councillor
Kelly Drummond
Outline of report and summary of discussion
The Council is asked to recognise Pride Month as a period of importance for many
of the residents of Midlothian, and to symbolise the Council's commitment to the
LGBTQI+ community, not only during the designated month of June, but in support
throughout the whole year. 
The Progress Pride flag, is a pride rainbow flag with an additional chevron design
that reflects the colours of the Transgender Flag, while the brown and black stripes
represent marginalized people of colour. The black stripe has a dual meaning, it
also gives recognition to those lost to HIV/AIDS and those still living with the
disease. 
As a Council we have a duty to uphold the equality of these marginalised groups
and a simple gesture, such as flying this flag, during the month of June will help
solidify this pledge to all of our constituents that are part of the LGBTQI+
community. 
The national flag mandates for national holidays will still be observed throughout
June, but the default flag around these events in June would become the Progress
Pride flag. 
Proposed by Cllr McManus ( Deputy Provost)
Seconded by Cllr Drummond 
Members spoke of the need to support all areas of the community and to
symbolically communicate this by showing support and raising the Pride Flag in
June 
Unanimously Approved 
Decision
To raise the Pride Flag in June at Midlothian House
Action
Executive Director Place 
The Monitoring Officer advised that as the Emergency Motion did not comply with
Standing Order 8.3, Members would require to suspend Standing Orders if they Page 8 of 340

Page 9

5
wished to discuss the Motion. A vote was called by the Provost and Members
agreed unanimously to suspend Standing Orders to allow the Emergency Motion to
be heard 
Report
No.
Report Title Report by:
7.3 Rail Strike - Emergency Motion  Proposed by Councillor
Peter Smaill 
Seconded by Councillor
David Virgo 
Outline of report and summary of discussion 
Midlothian Council resolves to communicate to the Scotrail Trains Limited, Network
Rail, and the RMT trade union our deep concern about the rail strikes which
followed on the failure of negotiations to resolve a pay dispute. 
Unlike the train driver union ASLEF, RMT appear to be demanding an unrealistic
11 per cent rise, which if agreed, would play a part in further fuelling an inflationary
spiral, and become a burden on taxpayers and passengers alike. 
The rail industry has received £27bn of Government support over the COVID
period- costing over £1,000 per UK household. In Scotland, even pre COVID,
annual subsidies totalled £832.6m. 
The strikes will deter passenger from relying on rail, and will harm the long-term
outlook for rail recovery in an environment where usage may be permanently lower
due to customers’ flexible working patterns. 
Midlothian is specifically concerned at the future of the Borders Railway, which has
received £9.6m in Council support and now faces again potential discontinuation
of the half- hourly service pattern. 
We call on the nationalised entity, Scotrail Trains, Network Rail,   and RMT to play
their part in supporting recovery by agreeing an affordable solution, balancing the
interests of employees and public alike; and instruct our officers to write on behalf
of the rail users of Midlothian accordingly. 
Proposed by Cllr Smaill
Seconded by Councillor Virgo 
Members of all parties expressed their views, many noting their opposition to the
motion prior to the vote.  Recent barrister wage settlements and Brexit cited as
issues.  The current cost of living crisis was also noted as something that affects
all families. 
Councillor Smaill noted a number of global affects that are out with the
Governments control including recovering from Covid-19 and the Ukrainian war. 
The Provost called a vote on the motion - 
For - 2
Against – 13 
(Note- Due to a connection failure Cllr Russell was unable to participate in the
vote) Page 9 of 340

Page 10

6 
Decision
Refused
Action
None 
8. Reports 
Report
No.
Report Title Report by:
8.1 Cost of Living Crisis Task Force Chief Executive
Outline of report and summary of discussion
The purpose of this report is to outline the Cost of Living Crisis facing our
communities and the urgent requirement to form a Task Force. 
Midlothian Council is recommended to: 
i. Note the report, Appendix 1, which was submitted to the Midlothian
Community Planning Partnership Board on 26 May 2022.
ii. To establish a Cost of Living Task Force as outlined in Appendix 2 
Dr Grace Vickers spoke to the report, noting the recommendations in appendices 1
& 2 for the Elected Members consideration and to nominate participants in a
taskforce. 
Members spoke about the pressure on all budgets and obligation to help those
struggling where possible. 
Nominations for a Cost of Living Taskforce – 
Councillor Parry 
Councillor Scott
Councillor McEwan
Councillor Pottinger
Councillor Virgo 
Proposed by Councillor Parry
Seconded by Councillor Milligan 
Recommendations passed unanimously 
Decision
Agreed
Action
To convene a Taskforce meeting after July recess 
No.  Report by:
8.2 Single Midlothian Plan and
Performance Reporting 
Chief Executive
Outline of report and summary of discussion
The purpose of this report is to draw to elected members attention the Single
Midlothian Plan 2022/23 and the performance report of Midlothian Community Page 10 of 340

Page 11

7
Planning Partnership. It is a statutory duty for the partnership to publish Local
Outcome Improvement Plan and associated performance reports. 
Recommendation: 
The Community Planning Partnership Board would like Council to note the
excellent partnership working which has produced the Single Midlothian Plan
2022/23, with a key focus to work with communities to secure improved outcomes
and reduce poverty. In addition the community planning partnership would like you
to note the Performance Report 21/22 
(October 2021 to March 2022), which highlights progress on indicators and
actions.   
Dr Grace Vickers spoke to the report noting the recommendation for the Elected
Members consideration 
Councillor Parry thanked the community planning partnership and the previous
elected members for their work. She asked for an easy read version to be made
available. For public consumption. 
Decision
All to Note
Action
Easy Read Version of the report to be created – Chief Executive 
No.  Report by:
8.3 Standing Order 19.2 Decision Council  Chief Executive
Outline of report and summary of discussion
The purpose of this report is to advise the Council of the decision taken by the
Chief Executive in terms of Standing Order 19.2.
At its meeting on 29 March 2022, the Council approved the following motion: 
“Making a contribution of £20,000 to the Disaster Emergencies Committee (DEC)
to fund its member charities’ UK-based activities in recognition of the considerable
strain the crisis in Ukraine has placed on the resources of these charities.  This
being funded by agreeing a supplementary estimate in 2021/22 met from the
general reserve.  Noting that the ability to do this is provided for by section 83(3) of
the Local Government (Scotland) Act 1973 which provides Council to incur
expenditure on contributions to any charitable body in furtherance of its work in the
United Kingdom.  Noting that the Council is not authorised to provide direct relief to
communities abroad”.
The Chief Executive advised that subsequent to meeting it transpired that DEC did
not fund UK based activity and therefore the payment proposed would be ultra
vires. In order to give effect to the will of the meeting, the Chief Executive had
Page 11 of 340

Page 12

8
accordingly used her powers under Standing Order 19.2 to re-allocate funding to
the British Red Cross and the International Red Cross. 
Recommendation:
Council is invited to note the terms of this report.
Dr Grace Vickers spoke to the report noting the recommendation for the Elected
Members consideration 
Councillor Parry moved to note the report, and proposed a briefing on the progress
of this work later in the year. 
Seconded by Councillor Virgo 
Decision
All to Note
Action
Briefing Ukrainian Refugees later in 2022 – Chief Executive 
No.  Report by:
8.4 Financial Monitoring 2021/22 –
General Fund Revenue report
Chief Officer Corporate
Solutions
Outline of report and summary of discussion
The purpose of this report is to provide Council with information on performance
against service revenue budgets in 2021/22 and details of material variances against
budget and the General Fund Reserve.  
This report incorporates all COVID related income and expenditure in 2021/22 with
related divergence from budgets fully funded by a combination of government grant,
whether ring fenced for specific purposes, or from the general funding provided, and
savings elsewhere in council budgets. 
The budget performance figures shown in appendix 1 result in a net underspend of
£3.091 million for the year being 1.28% of the revised budget and a £0.491m
improvement from that reported at quarter 3. 
Recommendation – 
Council is recommended to the contents of this report. 
Mr Gary Fairley spoke to the report highlighting various aspects then invited Elected
Members to ask any questions. 
Various Members asked a wide range of questions covering multiple aspects of the
report and appendices relating to the financial monitoring throughout the year. 
Mr Gary Fairley in response to questions replied, As a result of the decision of the
MAP (ESF Scottish Gov Management Group) not to agree to the change request to
reduce the financial envelope and the target numbers of participants in the ESF
programme, we were forced to withdraw from their ESF agreement with Scottish
Government.  We were not in a position to be within the acceptable error rate of Page 12 of 340

Page 13

9
evidence which is set at 2%.  Which means that claims could not be
progressed.  Whilst we accepted there had been staffing issues within the Council
ESF programme, it is the case that the error rate has been exacerbated by the rule
and changes which were put in place and changed by Scottish Government
departments throughout the programme and applied retrospectively.  If change
requests had been presented to the MAP earlier as requested the outcome and
financial liability could have been reduced. 
The decision to withdraw means we have directly funded ESF employability work with
partners over a number of years.  Small third sector partners were not in a position to
wait until claims and audits had been passed by Scottish Government for payment
therefore the council had to cover the costs of the work of partners. 
We also understand that Scottish Government had informed Council staff that the
claim which has been paid and audited successfully of £144, 318.31 would require to
be repaid.   
The “decision” to elect to withdraw was made by the Chief Officer however it was
reported to council through financial monitoring reports. 
Queries concerning maintenance services variance were also raised by Members
who requested who felt better performance was required in future. 
Councillor McKenzie stated a commitment to resolve this within the next 12 months. 
Decision
All to Note
Action
None 
Report
No.
Report Title Report by:
8.5 HRA Quarter 4 Monitoring 2021/22 Chief Officer Corporate
Solutions
Outline of report and summary of discussion
he purpose of this report is to provide Council with:-
• The final outturn position for 2021/22 for both the Housing Revenue
Account (HRA) Capital Plan and the Revenue Account;
• A revised capital plan for 2022/23 to 2026/27 reflecting the cross-year
movements from 2021/22. 
The summarised financial performance for 2021/22 is:
• Capital Investment in the year totalling £39.477 million;
• A net underspend of £0.374 million on the Revenue Account;
• An HRA reserve at 31st March 2022 of £28.084 million the majority of which
is committed to finance existing investment in the new build programme. 
Mr Gary Fairley highlighted aspects of the report inviting all to note and offered to
take questions. 
Decision
All to Note
Action Page 13 of 340

Page 14

10
None 
Report
No.
Report Title Report by:
8.6 General Services Capital Plan
Outturn 2021/22
Chief Officer Corporate
Solutions
Outline of report and summary of discussion
The purpose of this report is to provide Council with:-
1. An update of the General Services Capital Plan incorporating information on
further additions to the Capital Plan for approval (Section 3.1) and
adjustments to existing budgets in the Capital Plan (Section 3.2);
2. Information on the final outturn performance against budget for 2021/22
(Section 4.1-4.4);
3. An update on the capital fund balance at 31 March 2022 (Section 5). 
Recommendations:
1. Approve the additions to the General Services Capital Plan as set out in
section 3.1;
2. Approve the adjustment to the project expenditure and funding budgets
for the projects outlined in section 3.2.
3. Note the General Services Capital Plan outturn position for 2021/22 as
set out in Section 4. 
Mr Gary Fairley highlighted aspects of the report, inviting Elected Members to
consider the recommendations and then offered to take questions. 
Members asked a number of questions relating to underspend and timescale
concerns and their wider impact. Also raised was the orbital bus service and the
PassivHaus       project, in particular the need for Members to be updated on the
latter. 
Councillor Parry Moved the report and recommendations
Councillor Milligan seconded 
Decision
Agreed
Action
None 
Report
No.
Report Title Report by:
8.7 Financial Governance Chief Officer Corporate
Solutions
Outline of report and summary of discussion
The purpose of this report is to present an updated version of the Financial
Regulations for approval. 
Section 95 of the Local Government (Scotland) Act 1973, requires all Local
Authorities in Scotland to have adequate systems and controls in  Page 14 of 340

Page 15

11
place to ensure the “proper administration of their financial affairs”, 
Including the appointment of an officer with full responsibility for their governance.
The Financial Regulations are a core element of the systems and controls with the
requirement that any changes to these require the approval of Council.   
The Financial Regulations are supported by a series of Financial Directives which
are also being updated and will be presented to Audit Committee on 29 June 2022
for their endorsement (as required by the Financial Regulations).  
The Financial Regulations are by their nature high level and the changes which
have been incorporated since they were last approved are principally to reflect the
Scheme of Administration and the current Leadership Structure.   
Recommendations: 
Council is recommended to approve the updated Financial Regulations set out in
appendix 1.
Mr Gary Fairley spoke to the report highlighting aspects of the report, inviting
Elected Members to consider the recommendation and then offered to take
questions. 
Councillor Parry moved to agree the report 
Councillor Scott seconded
Decision
Agreed
Action
None 
Report
No.
Report Title Report by:
8.8 Audit Committee Annual End of
Term Report 2021/22
Chair of the Audit
Committee
Outline of report and summary of discussion
The purpose of this report is to provide Members with the Audit Committee Annual
/ End of Term Report 2021/22, which sets out how the Audit Committee has
performed against its remit and the effectiveness of the Audit Committee in
meeting its purpose based on the annual self-assessments of the Committee
against best practice, and provides assurances to the Council. 
It is important that the Council’s Audit Committee fully complies with best practice
guidance on Audit Committees to ensure it can demonstrate its effectiveness as a
scrutiny body as a foundation for sound corporate governance of the Council. 
The Chartered Institute of Public Finance and Accountancy (CIPFA) Audit
Committees Practical Guidance for Local Authorities and Police 2018 Edition
(hereinafter referred to as CIPFA Audit Committees Guidance) includes the
production of an annual report on the performance of the Audit Committee for
submission to the Council. 
The Audit Committee Annual / End of Term Report 2021/22 is appended to this
report as Appendix 1 for consideration. Midlothian Council continues to adopt this
best practice. Page 15 of 340

Page 16

12 
Recommendations: 
a) acknowledge the performance of the Audit Committee and its
assurances to the Council, as set out in the Audit Committee Annual /
End of Term Report 2021/22 (Appendix 1); and
b) endorse the Audit Committee’s shared lessons learned and identified
areas of improvement, set out in Appendix 1 and paragraph 4.2 of this
report, to inform the new Audit Committee post local government
elections in May 2022 to enhance the Audit Committee’s effectiveness
as a scrutiny body. 
In the Audit Chair’s absence, Mr Gary Fairley spoke to the report highlighting
aspects of the report, inviting Elected Members to consider the recommendations
and then offered to take questions. 
Provost thanked the outgoing Chair, Mike Ramsay, for his work this was echoed
by various Members. 
Councillor Parry moved to approve the report and its recommendations
Councillor Smaill seconded 
Decision
Agreed
Action
None 
Councillor Drummond left the meeting for item 8.9 due to a conflict of interest 
Report
No.
Report Title Report by:
8.9 Business Travel Report  Chief Officer Corporate
Solutions
Outline of report and summary of discussion
Undertaking Business travel in employees own vehicles remains a legitimate
strand of the Councils Business Travel and Subsistence Policy. Where employees
do use their own vehicle for business travel they are reimbursed at the HMRC rate
which has been and remains at 45p per mile. Reimbursement at or below this rate
does not incur an income tax charge on the payments and has been widely
recognised as an appropriate benchmark for reimbursement.   
The increase in vehicle fuel costs has brought added financial pressure on
employees who use their own vehicle on Council business, particularly staff
working in Health and Social care services.  The adequacy of the HMRC rate for
Local Government workers has been brought into question by the agreement of
the Secretariat of the Scottish Terms and Conditions Committee covering NHS
services in Scotland to temporary increase to NHS Scotland standard business
travel mileage rates of 5p per mile.   The temporary changes to the NHS agenda
for change rates bring the reimbursement rate to 61p per mile for the first 3,500
miles and 25p per mile thereafter.   
Recommendations: 
i. Note that on 21St April 2022 the Secretariat of the Scottish Terms and
Conditions Committee covering NHS services in Scotland agreed a Page 16 of 340

Page 17

13
temporary increase to NHS Scotland standard business travel mileage rates
of 5p per mile.
ii. Note that there was no consultation and or indication of this change given to
Councils whose staff work alongside NHS colleagues under the integration
of Health and Social Care arrangements.
iii. Agree to change the Council’s reimbursement arrangements from the
HMRC rate of 45p per mile to mirror the revised Scottish agenda for change
as set out in section 4 and in line with the NHS agreement that this change
be backdated to cover mileage incurred since 1st April 2022.
iv. To note that the NHS agreement is described as a temporary measure to
31st July with two month’s to be given before any reversion to the national
agreed rates. The two months notice has not been triggered at the time of
writing and so it will remain in place until at least mid-August 2022.
Accordingly agree to delegate authority to the Chief Officer Corporate
Solutions to make any further changes to the reimbursement rates to
maintain parity with the NHS agenda for change rates. 
Mr Gary Fairley spoke to the report highlighting aspects of the report in particular
the need to match the discrepancy created by NHS Scotland increasing the
mileage rate for Care workers, inviting Elected Members to consider the
recommendations and then offered to take questions. 
Members spoke at length about the current struggles for workers some struggling
to get to work to get to each client in a timely fashion. 
An action was proposed by Councillor Parry to write to the HMRC and the local MP
to ask them to consider raising the rates so this type of payment would not be
taxed 
Mr Gary Fairley noted that with this report and if approved Midlothian would be an
early adopter to the raising the mileage rate. 
Members requested any back money due should be issued as soon as possible. 
Mr Gary Fairley assured Members work was underway to do so for July and would
explore if sooner is possible. 
Councillor Parry moved to approve the report and its recommendations also the
action proposed 
Councillor Milligan seconded and also the proposed action 
Decision
Agreed
Action
Write to HMRC, UK Government  and Local MP to make the case for raising
the tax threshold to not unduly affect workers receiving the increased
mileage payments -  Chief Officer Corporate Solutions 
Councillor Drummond returned to the Meeting 
Report
No.
Report Title Report by:
8.10 Easthouses Primary School  Head of Development
Outline of report and summary of discussion Page 17 of 340

Page 18

14
In an update of the General Services Capital Plan 2021/22 Quarter 3 Monitoring
Report and 2022/23 to 25/26 Budgets (report to Council 15th February 2022), it was
highlighted that: 
• The Strategic Outline Business Case for Easthouses Primary School had
been approved by Children, Young People & Estates Capital Programme &
Strategy Board on 20 January 2022, and Capital Plan & Asset Management
Board on 25 January 2022.
• That the budget for the provision of a 2 stream primary school, with 18 ASN
places and 120 Early Years spaces had risen from the existing fully approved
capital expenditure budget of £13.205 million to £18.616 million.
• That the increase in cost was to be funded through a mix of increased
application of Early Years Grant (£0.414 million), increased application of
developer contributions (£4.003 million) and an increase in prudential
borrowing (£0.994 million). 
The report highlighted that the increase in costs reflected improved energy
requirements as part of the building design in line with the Council’s Net Zero to
2030 commitment, and the latest estimates of costs.  The £18.616m budget was
arrived at by applying the Scottish Futures Trust (SFT) funding metric (£4,244/m2)
to the proposed 4,386sqm development and includes historic expenditure on fees
to date.  In the past, Midlothian Council has delivered school developments within
that funding metric. 
However, it should be noted that this metric has not been updated in recent years
and has not kept pace with level of inflation that has affected the construction market
in the last 12 – 18 months. 
The £18.616m budget was also less than the £20.12m that quantity surveyors
advising the Council (Thomas & Adamson) estimated at the time it would cost to
deliver the school.   
Following this report, Midlothian Council utilised HubSE to appoint a Tier 1
contractor in order to avail of their expertise in design development and value
management, seeking to drive savings and bring the budget in line with the SFT
Metric. 
However, any savings achieved by reductions in floor area and careful review of
project costs have been overtaken by the inflationary impact on the construction
market which is pushing the cost of parts and labour upwards. This has been verified
through market testing via our preferred contractor Morrison.   
As a result, in order to deliver the approved design for Easthouses Primary School,
the proposed Affordability Cap is now £21.59m. This represents a cost of £4922/m2.  
The cost of delivering the school in addition to historic costs associated with the
project require an adjustment to the General Services Capital Plan to reflect an
overall budget of £22.044m. 
Recommendations: 
i. Notes that the design development of Easthouses Primary School through
HubSE has concluded and a school design for the new two stream primary
school has been approved by Education.
Page 18 of 340

Page 19

15
ii. Notes that following a competitive tender process through HubSE, a preferred
contractor is in place and has been refining this design with officers in both
Place and Education.
iii. Notes that the approved budget in the General Services Capital Plan for this
project is £18.616m.
iv. Approves an Affordability Cap for this project of £21.59m to allow its
procurement to proceed, supported by the rationale provided in the report
below and in the Full Business Case appended to this report.
v. Approves the procurement of the project on the basis of the Full Business
Case.
vi. Approves a General Services Capital Plan budget of £22.044m for the overall
project cost. 
Ms Fiona Clandillon spoke to the report at length, highlighting various aspects and
noting the recommendations for Elected Members’ consideration before taking
questions. 
Members raised the issue concerning why Midlothian was using HubSE. Members
further queried why Midlothian wasn’t using a more traditional process. It was also
felt that Members should be given a chance to review the process, questioning what
assurances that HubSE could give. 
Ms Fiona Clandillon and Mr Ross Morrison responded to questions 
Councillor Imrie felt there was no governance for what Midlothian officers had done
and asked who had made or authorised changes to the tender process to use
HubSE .  He further added that he did not think officers had a mandate to take this
action and asked the Chief Executive for a response. 
Dr Grace Vickers responded that she was not directly involved noting this project
had gone through two boards previously to being presented to Council today. She
added that the paper can be withdrawn if Members wish to do so. 
Mr Alan Turpie reminded Members that the report was presented today for approval
of the procurement. 
Members then discussed the merits of the school and if it was prudent or affordable
to wait. Most did not want to delay the project but sought further assurances from
Council Officers and more scrutiny by Councillors in future. 
Mr Gary Fairley highlighted that Midlothian use the Learning Estate Investment
Programme cost matrix to assess monitor value for money with all Learing Estate
projects. Noting that The passive house project increases the cost, which
themselves have increased with inflation now at 10%. 
Councillor Milligan proposed the report and recommendations
Councillor Smaill seconded 
Unanimously Agreed 
Decision
Recommendations agreed
Action
Page 19 of 340

Page 20

16
• A paper covering the capital project procurement process and how
councillors can have greater scrutiny over procurement decisions, including
using the development partner Hub South East Scotland’s competitive
tender process – Head of Development 
• A seminar later in the year to explore procurement through HubSe and
procurement in general terms  – Head of Development 
Brief break at 1.03 pm (10 minutes) 
Meeting reconvened at 1.13 pm 
Report
No.
Report Title Report by:
8.11 A701 Council Report  Head of Development
Outline of report and summary of discussion
This report presents a progress update on the A701 Relief Road and A702 Spur
Road project. The report updates member on the design development of the project,
the outcome of the public consultation exercise, budget implications of the design
development and next steps related to the compulsory purchase process necessary
to secure the preferred route and progress the delivery of the project. 
This report updates the estimated financial position in relation to the project and
identifies an increased variance between the approved budget and the estimated
project cost, currently a shortfall of circa £33.2m. 
Recommendation: 
That Midlothian Council notes the following in relation to the A701 Relief Road, A702
Spur Road project:
• The STAG 2 Report has been finalised and Work Stage B is complete
• The Consultation process associated with the STAG 2 appraisal process is
complete in relation to the above project
• A preferred route has been selected (Route C)
• Preparatory works for compulsory purchase are commenced to mitigate
adverse implications on the project programme
• The project is to move into Work Stage C (Specimen Design)
• In the course of Work Stage B, total overall estimated costs for delivery of
above project have risen to £55m (including cost of Sustainable Transport
Corridor and Straiton Junction Signalisation)
• This has resulted in the funding gap associated with this project currently
estimated to be £33.2m.
• While this funding gap may decrease as we progress Stage C, with greater
certainty over costs emerging, a significant funding gap is likely to remain.
• It is therefore recommended that Midlothian Council submit an application to
the Levelling Up Fund (LUF) to attract alternative funding into the project to
close this gap. 
Ms Fiona Clandillon spoke to the report, highlighting various aspects including its
aim to ease congestion and noting the recommendations for Elected Members’
consideration before taking questions. 
Councillors asked a range of questions including the apparent funding gap, if there
had been consideration of an alternate route, or plan ’B’. Members also queried the
type of report being presented noting there were no procurement costs.  Page 20 of 340

Page 21

17
Ms Fiona Clandillon explained the process from blank sheet to current state of the
plan/ project. She noted the costs at this stage were estimates but that now more
analysis was required including details of the actual ground the route would pass
through/ over. Ms Clandillon also referred to previous comments earlier in the
meeting concerning unprecedented inflation rises since the initial plan was first
presented. It is fully expected that the costing estimate will drop. Responding to the
plan ‘B’ suggestion, Ms Clandillon said the team would look at other opportunities if
the Levelling Up fund was not approved. She went on to note this report was a
quantitive planning route, Midlothian Council follow the Transport Scotland Act and
that there has been no procurement. The next stage will be to produce detailed
designs which will also firm up more realistic costs. 
Councillor Parry welcomed the report but stressed the need for Ward members and
Cabinet to be kept up to date at each key stage of the project. 
Further questions were asked by members querying whether or not to wait until it
was clear the project would benefit from the Levelling up fund. 
Ms Fiona Clandillon responded  that a lot of work had already been completed, the
project would deliver great benefits for the area. If delayed it would lose momentum
and reduce certainty. 
Councillor Parry moved to approve 
Councillor Imrie seconded 
Unanimously Approved 
Decision
Agreed
Action
Regular updates to Cabinet and local Ward members at each key stage – Head of
Development 
Report
No.
Report Title Report by:
8.12 Local Transport Strategy   Executive Director Place
Outline of report and summary of discussion
The purpose of this report is to provide Council with context to review the Local
Transport Strategy for Midlothian and the proposed timescale and measures to do
so. 
Recommendations: 
i. notes the current development of key local, regional and national strategies
relating to the economic, environmental, transportation and land-use sectors
and the need accordingly to review Midlothian’s Local Transport Strategy;
and
ii. approve the financial resources required for the development of the Local
Transport Strategy for Midlothian. 
In the absence of the Executive Director Place, Mr Derek Oliver spoke to the report,
highlighting various aspects and noting the recommendations for Elected member’s
consideration before taking questions. 
Page 21 of 340

Page 22

18
Members requested that as well as electronic access to the consultation provision
was put in place at libraries so no-one was excluded. 
Councillor Alexander moved to approve the report
Councillor McKenzie seconded   
Unanimously Agreed 
Decision
Agreed
Action
Access to the consultation process to widened to include Libraries – Chief Officer
Place 
Report
No.
Report Title Report by:
8.13 Midlothian Council Speed Policy
and Roads Hierarchy Review 
Chief Officer Place
Outline of report and summary of discussion
The purpose of this report is to implement policy to improve road safety and seek to
implement appropriate speed limits across Midlothian, its towns and settlements. 
Recommendations: 
i. Approves the Midlothian Council Speed Policy;
ii. Approves the Hierarchy Review report as a reference for improving safety on
Midlothian roads; and
iii. Approves Officers to undertake public consultation on local road safety issues
in line with these documents; 20mph speed restrictions within towns and
settlements; speed reductions across identified sections of the network; and
return to a future Council meeting with findings and proposals. 
Mr Derek Oliver spoke to the report, highlighting various aspects and noting the
recommendations for Elected member’s consideration before taking questions. 
Members expressed views and welcomed the pro-active approach outlined. Special
mention was made of school pick/ drop offs and safe routes also near misses many
of which were not officially reported. 
Mr Derek Oliver confirmed all would be included in the consultation, in particular
school safe routes would be reviewed. He added that any 20 mph zones would run
for a minimum of 600 metres. Also in response to questions concerning E-Scooters
on public highways and the speed of cyclists that highway issues were a matter for
the Police, the highway code had recently tried to address some of these concerns
relating to cyclists and pedestrians. 
Councillor Alexander moved to approve the report
Councillor Parry seconded 
Unanimously Approved 
Decision
Agreed
Action
Benchmark with other local authorise to ascertain the best way to manage multiple
highway use – Chief Officer Place Page 22 of 340

Page 23

19 
Report
No.
Report Title Report by:
8.14 Local Authorities Covid Emergency
Recovery Funds 
Chief Social Officer & Chief
Officer Place
Outline of report and summary of discussion
The purpose of this report is to outline the LACER Funds available, the criteria for
the funds and associated actions to mitigate consequences of Covid19 and the Cost
of Living Crisis. 
Recommendations: 
• Agree the division of LACER funds between the two Scottish Government
recommended areas for support, Low Income Households 71% £961,219
and Business Support 29% £398,781.
• To adopt the project proposals for the LACER funds which will support live
well locally partnership models, support households on low income and
stimulate economic activity in Midlothian.
• To agree to continue to fund the Trusted Partner model of distributing funds
to those most in need at a local level. This has a primary focus on supporting
local people to access food, as well as heating their homes, as part of
mitigation towards the cost of living crisis. 
In the absence of the Chief Social Officer, Ms Annette Lang spoke to the report,
highlighting various aspects and noting the recommendations for Elected Members’
consideration. She invited Derek Oliver to add anything more before taking
questions. 
Members felt it was unclear how the budget was being split and how much was
making its way to families in most need. Concerns raised included how much of the
fund was used for staffing costs feeling existing front line staff could be better used.
Members felt the paper should be removed and return in August with clearer more
detailed approach. 
Councillor Parry moved that this report be removed and return in August with more
detail included. 
Councillor Virgo seconded 
Councillor Milligan added that the delegated authority to Chief executive should be
highlighted within the revised report for obvious matters that perhaps need to be
acted on quickly, these areas or items of delegation should be made clear in the
revised report.   
All Elected Members agreed 
Passed 
Decision
• Report to be represented to August Council  - Agreed 
Action
• Local Authorities Covid Emergency Recovery Fund to be rewritten and
represented to August Council with more focus on low income households
Page 23 of 340

Page 24

20
and to highlight any areas requiring delegated authority - Chief Social
Worker & Chief Officer Place 
Report
No.
Report Title Report by:
8.15 Levelling Up Fund 2 and Shared
Prosperity Fund 
Executive Director Place
Outline of report and summary of discussion
The purpose of this report is to seek Council’s agreement for projects to be
progressed as applications to the UK Government’s Levelling Up Fund 2 and the
Shared Prosperity Fund. The application deadline for the Levelling Up Fund 2 is on
the 6th of July 2022. The application for     the Shared Prosperity Fund is on 1st
August, 2022 and a final outcome    response from UKG for each of these funds is
expected by Autumn 2022. 
Recommendations: 
1. Agree applications for proposed projects as detailed within the report as the
council’s bids into the respective funds;
2. Delegates the Executive Director – Place to complete and submit applications
by the respective deadlines and;
3. Delegates the Executive Director – Place to consider any external
applications following the external applications process and ensure
applicants are informed of the outcome. 
In the absence of the Executive Director Place, Mr Derek Oliver spoke to the report,
highlighting various aspects and noting the recommendations for Elected member’s
consideration before taking questions. 
Despite some reservations concerning the funding formula Members moved to
approve the motion. 
Councillor Parry moved to approve the recommendations within the report
Councillor McEwan seconded 
Decision
Agreed
Action
None 
Report
No.
Report Title Report by:
8.16 Environmental Crime Enforcement
- Service Delivery 
Chief Officer Place
Outline of report and summary of discussion
This report follows from the approved Council report in February, 2022 where the
original costing proposals by the recommended provider were significantly
increased prior to confirmation of any service implementation. 
The purpose of this report is to therefore provide Council with revised options to
implementing the Environmental Crime Enforcement Strategy, with the resource to
undertake engagement, education and robust enforcement of environmental crime
incidents, including fly-tipping, littering, dog fouling and other associated offences.   Page 24 of 340

Page 25

21 
Recommendation: 
Council is recommended to approve the pilot service delivery for 12 months of a
dedicated Environmental Crime Team by way of an external provider, to
complement the implementation of the Environmental Crime Enforcement Strategy. 
Mr Derek Oliver spoke to the report, highlighting various aspects and noting the
recommendations for Elected member’s consideration before taking questions. 
There were some reservations amongst the Members concerning success rates of
fine payments and their pursuit, also some publicised intimidation tactics of similar
companies in England, it was agreed a pilot would be useful to prove if this would
be viable going forward. 
Councillor Milligan moved to approve the report 
Councillor Alexander seconded 
Agreed unanimously 
Decision
Agreed
Action
None 
Councillor Russell left the meeting at approximately 1.34 pm 
Report
No.
Report Title Report by:
8.17 Midlothian Integration Scheme
Review 
Monitoring Officer/Legal
and Governance Manager
Outline of report and summary of discussion
In 2016 Midlothian Council entered into the Midlothian Integration Scheme with NHS
Lothian to establish the Midlothian Integration Joint Board (‘MIJB’). 
The Public Bodies (Joint Working) Scotland Act 2014 requires the Council and the
NHS to carry out a review of the integration scheme within five years from the date
the Scottish Ministers approved the scheme. 
This report outlines work undertaken jointly to comply with this duty. The report
seeks Council approval of the draft revised Midlothian Integration Scheme, and
subject to approval of the Scheme by NHS Lothian, authority  to  submit  the draft
revised Integration Scheme to Scottish Ministers for their approval, as required by
law. 
Recommendation:
a) Approve the final draft revised Midlothian Integration Scheme; and
b) Agree to submit the revised Midlothian Integration Scheme to the Scottish
Ministers. 
Mr Alan Turpie spoke to the report, highlighting various aspects and noting the
recommendations for Elected member’s consideration before taking questions. 
Councillor Parry moved to approve the report
Councillor Milligan seconded  Page 25 of 340

Page 26

22 
Agreed unanimously
Decision
Agreed
Action
Revised Midlothian Integration Scheme to be submitted to Scottish Ministers 
Report
No.
Report Title Report by:
8.18 Voluntary Community Asset
Transfer- WITHDRAWN 
Executive Director Place
Outline of report and summary of discussion
Withdrawn 
Decision
N/a
Action
N/a 
Public Council Meeting ended at 2.34 pm 
9. PRIVATE Reports
The meeting concluded at 3.27 pm
___________________________________________________________________
Date of Next Meeting 23 August 2022 
Page 26 of 340

Page 27

Action Log 
No Subject Date Action Action Owner Expected
completion
date
Comments
1 Minute action -
prospective crematorium
development.
16/11/2021 Scope potential suitable sites
for prospective crematorium
development.
Chief Officer
Place
October 2022 Report scheduled for
October Council.
2 Motion Amendment –
Loanhead  Football
Club
16/11/2021 Update the Sports Needs
Assessment from 2016 and
report to future council
meeting
Head of Adult
Social Care/
Sport & Leisure
Manager 
TBC Procurement completed
and the contracted
company are finalising the
scoping element and have
been working with the
Scottish FA for team and
club data, as well as
priming key clubs for
consultation. They have
been organising specific
site visits and/or face to
face consultations. 
3 Motion - Infrastructure  14/12/2021 Report to Council  Strategic
Investment Framework 
Executive
Director Place
TBC Strategic Infrastructure
Investment Framework 2nd
stage review has
commenced and full
report shall be presented
to Council when
completed and available.
Midlothian Council 
23 August  2022   
Item 5.3
Page 27 of 340

Page 28

No Subject Date Action Action Owner Expected
completion
date
Comments
4 Minute Action – Future
Hybrid Meetings 
14/12/2021 Updated Hybrid Meetings
Report – Spring 2022
Chief Officer
Corporate
Solutions 
June 2022 Council meeting on 24
May 2022 referred to a
Short Life Working Group,
now scheduled to meet in
August.
5 Minute Action - CCTV 14/12/2021 To Provide a Report outlining
an expansion of sites for
CCTV
Chief Officer
Place
March  2022 Work progressing with
Police Scotland and report
scheduled for October
Council.
6 Minute Action –
Improving Energy
efficiency by tackling
Dampness,
Condensation and
improving ventilation 
15/02/2022 Provide a Report to Council 
Additional Report –
Update on Current Housing
Stock that will not meet
Energy Efficiency Targets
Chief Officer
Place
June 2022 Work progressing.  Report
scheduled for October
Council.
7 Cost of living Taskforce  28/06/2022 To convene the taskforce
after summer recess
Executive
Director Place 
August 2022 Group now scheduled to
meet in August.
8 Ukrainian Refugee
Briefing 
28/06/2022 Ukrainian Refugee Briefing later
in the year
Chief Executive  September/
October 2022
Briefing scheduled in
September.
9 Midlothian Write to HMRC,
Westminster Department
and Local MP 
28/06/2022 To make the case for raising the
tax threshold to not unduly affect
workers receiving the increased
mileage payments -  
Chief Officer
Corporate
Solutions
August 2022 Letters sent in July 2022
Page 28 of 340

Page 29

No Subject Date Action Action Owner Expected
completion
date
Comments
10 A paper covering the
capital projects 
procurement process
and how councillors can
have greater scrutiny
over procurement
decisions
28/06/2022 including using the
development partner Hub
South East Scotland’s
competitive tender process 
Head of
Development
September
2022
Report scheduled for
October Council following
Briefing session.
11 A seminar on
procurement for
councillors later in the
year 
28/06/2022 Procurement Seminar  Head of
Development
September/
October 2022
Briefing scheduled in
September.
12 Local Authorities Covid
Emergency Recovery
Fund
28/06/2022 Report to be represented to
August Council with more focus
on Low Income Families
Chief Social
Worker & Chief
Officer Place
August 2022 LACER report deferred
until the Cost of Living
Taskforce is convened
13 Arm’s Length Company to
Manage Industrial Sites in
Midlothian 
28/06/2022 Explore and outline process for
creating an Arm’s length
company 
Head of
Development
October 2022 Report scheduled for
October Council       
Page 29 of 340

Page 30

Page 30 of 340

Page 31

Standing up for Responsible Tax Conduct
Midlothian Council notes that:
1. The public expectation on organization’s to pay the right amount of
Tax in the right place at the right time has never been stronger.
2. Polling from the Institute for Business Ethics finds that "corporate tax avoidance"
has, since 2013, been the clear number one concern of the British public when it
comes to business conduct.
3. Almost two-thirds (63%) of the Scottish public agree that the Government and
local councils should consider a company's ethics and how they pay their tax as
well as value for money and quality of service provided, when undertaking
procurement.
4. Around 15% of public contracts in Scotland have been won by companies with
links to tax havens.
5. It has been conservatively estimated that losses from multinational profit-shifting
(Just one form of tax avoidance) could be costing the UK some £17bn per annum
in lost corporation tax revenues.
6. The Fair Tax Mark offers a means for business to demonstrate good tax conduct,
and has been secured by wide range of businesses across the UK, including
FTSE-listed PLCs, co-operatives, social enterprises and large private
businesses.
Full Council believes that:
1. Paying tax is often presented as a burden, but it shouldn't be.
2. Tax enables us to provide services from education, health and social care, to
flood defences, roads, policing and defence. It also helps to counter
Item 7.1
Page 31 of 340

Page 32

Page 32 of 340

Page 33

Page 33 of 340

Page 34

Page 34 of 340

Page 35

Midlothian Council
23rd August 2022   
Housing Revenue Account
Revenue Budget and Capital Plan 2022/23 
Report by Gary Fairley, Chief Officer Corporate Solutions. 
Report for Noting 
1 Recommendations 
Council is recommended to note the contents of this report.   
2 Purpose of Report/Executive Summary 
The purpose of this report is to provide Council with a summary of
expenditure and income to 4th July 2022  for the Capital Plan and a
projected outturn for both the Housing Revenue Account (HRA) and
Capital Plan for 2022/23.    
The summarised financial performance for 2022/23 is:
• Capital Investment in the year totalling £67.566 million; 
• A net overspend of £0.294 million on the Revenue Account;
• A projected HRA general reserve at 31st March 2022 of £31.819
million. 
Date 28th July 2022 
Report Contact: 
Name Lisa Young Tel No 0131-271-3111
lisa.young@midlothian.gov.uk 
Item 8.1
Page 35 of 340

Page 36

2 
3 Background 
3.1.1 Capital Plan 2022/23 
The Capital Plan Budget has been revised to reflect the current profile
of spend as shown in appendix C.  Capital investment in the year is
projected to be £67.566 million and there are currently no material
variances to be reported.   
The construction industry in Scotland and the UK is currently
experiencing unprecedented adverse market conditions, which is
leading to significant rises in tender prices for a wide range of
materials. There is evidence that inflation of between 10% and 15%
beyond BCIS predictions is affecting projects and whilst measures
such as value engineering are partially mitigating cost increase there
is a risk that the capital budgets provided for delivery of the New
Social Housing project will need to be increased with a resultant
impact on the funding strategy. The situation is currently being
monitored and reviewed and an update will be provided to Council
when the value of the impact has been determined. 
3.2 Revenue Account 2022/23 
For 2022/23 there is currently a projected overspend of £0.294 million
against budget, as shown in appendix D. The most up-to-date version
of the New Social Housing delivery plan gives rise to the following
projected areas of variance from the approved budget:- 
• Lower in-year borrowing costs of £1.129 million; and
• Reduced rental income of £0.807 million. 
Other reported pressures against budget are:- 
• A projected increase in the provision for and subsequent write-
off of rent related debt of £0.288 million. This is due to a
projected drop in collection levels as a result of the pandemic;
• An increase in the number of buybacks and works required to
bring properties up to standard as well as works on more
complex void properties will result in an overspend in general
repairs of £0.356 million. 
The HRA general reserve balance is projected to be £31.819 million at
31st March 2023, which is committed to finance existing investment
commitments to 2037/38. 
3     Report Implications 
3.1  Resource
There are no direct resource implications arising from this report. 
Page 36 of 340

Page 37

3
3.2  Digital
There are no direct digital implications arising from this report. 
3.3 Risk
The principal risks are around the issue of affordability, ensuring that
the investment in new build and the existing stock can be made
without having to impose unacceptable increases on weekly rents.
This is mitigated by the adoption of a long term financial strategy and
modelling which demonstrates that existing investment commitments
are sustainable. 
There is also the risk of capital spend being lower than projected due
to delays on projects, particularly in the current climate , this could
result in lower debt charges causing the Housing Revenue Account
Reserve balance to increase more than projected. 
3.4 Ensuring Equalities
There are no equality issues arising directly from this report. 
3.5 Additional Resource Implications
See Appendix A. 
Appendices
Appendix A – Additional Resource Implications
Appendix B – Background Information
Appendix C - Capital Plan 2022/23
Appendix D – Revenue Account 2022/23 
Page 37 of 340

Page 38

4 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value. 
A.5 Involving Communities and Other Stakeholders 
The report does not directly relate to involving communities. 
A.6 Impact on Performance and Outcomes 
Page 38 of 340

Page 39

5
The report does not directly impact on Midlothian Council’s
performance and outcomes. 
A.7 Adopting a Preventative Approach 
The report does not directly relate to adopting a preventative approach. 
A.8 Supporting Sustainable Development 
The report does not directly relate to supporting sustainable
development. 
APPENDIX B 
Background Papers/Resource Links 
HRA Capital Plan and Revenue Budget enclosed 
Page 39 of 340

Page 40

Page 40 of 340

Page 41

MIDLOTHIAN COUNCIL Appendix C
HOUSING REVENUE ACCOUNT CAPITAL PLAN 2022/23
Revised
Budget
2022/23
Actuals to
Date
Projected
Outturn
Variation
(Under)/Over
£'000 £'000 £'000 £'000
FUNDING
Grants
- Incentivising New Build 1,341 0 1,341 0
- Buy Backs Funding 880 250 880 0
Council Tax on Second Homes 96 0 96 0
Borrowing Requirement 65,249 7,358 65,249 0
TOTAL AVAILABLE FUNDING 67,566 7,608 67,566 0
APPROVED EXPENDITURE £'000 £'000 £'001 £'000
New Build Houses Phase 2, Phase 3 & Phase 4 53,895 5,259 53,895 0
Buy Backs 3,300 1,115 3,300 0
Aids & Adaptations 454 72 454 0
Environmental Improvements 1,000 0 1,000 0
BDHS Meters 1,300 0 1,300 0
Homelessness - Temporary Accommodation Provision 415 197 415 0
Scottish Housing Quality Standard 0
-Upgrade Central Heating Systems 1,673 226 1,673 0
-SHQS Repairs 5,529 739 5,529 0
TOTAL EXPENDITURE 67,566 7,608 67,566 0
Item 8.1
Page 41 of 340

Page 42

MIDLOTHIAN COUNCIL Appendix D
HOUSING REVENUE ACCOUNT 2022/23  
Revised Projected Variation
Budget Outturn (Under)/Over
Average No of Houses 7,451               7,370              (81)
£000's £000's £000's
Repairs and Maintenance
General Repairs 6,356 6,712 356
Decant/Compensation 63 53 (10)
Grounds Maintenance 801 826 25
7,220 7,591 371
Administration and Management 5,332 5,332 0
Loan Charges 13,790 12,661 (1,129)
Other Expenses 2,682 2,988 306
TOTAL EXPENDITURE 29,024 28,572 (452)
Rents
Houses 31,950 31,143 807
Garages 617 617 0
Others 486 547 (61)
TOTAL RENTS 33,053 32,307 746
NET EXPENDITURE/(INCOME) (4,029) (3,735) 294
Movement in HRA Reserve
Opening HRA Reserve (28,084)
Enhancement during 2022/23 as above (3,735)
Reserve Earmarked to fund capital investment plans (31,819)
Page 42 of 340

Page 43

2
Midlothian Council
23 August 2022   
Annual Treasury Management Report 2021/22 
Report by Gary Fairley, Chief Officer Corporate Solutions 
Report for Decision 
1 Recommendations 
It is recommended that the Council note the Annual Treasury
Management Report 2021/22. 
2 Purpose of Report/Executive Summary 
The purpose of the report is to inform members of the Council of the
Treasury Management activity undertaken in 2021/22 and the year-end
position. 
Audit Committee on 29 June 2022 scrutinised a draft of this report in
advance of its consideration today by Council.  This final report to
Council reflects the Audit Committee comments arising from the
meeting on 29 June 2022. 
Date: 04 August 2022
Report Contact:
Gary Thomson, Senior Finance Business Partner
gary.thomson@midlothian.gov.uk 
Item 8.2
Page 43 of 340

Page 44

2
3 Background 
The main points arising from treasury activity in 2021/22 were: 
• The pooled internal loans fund rate for General Fund and HRA
was 2.98% in 2021/22, which is again expected to be one of the
lowest when benchmarked against all mainland Authorities in
Scotland; 
• Were the pooled internal loans fund rate to have equated to the
Scottish weighted average of 3.68%, this would have generated
loan charges in 2021/22 of £16.3 million.  The Council’s actual
2021/22 loan charges for General Services and HRA were £14.1
million, representing a cash saving (compared to the Scotland
average) of £2.2 million in 2021/22; 
• Total new long term borrowing taken in the year amounted to
£50.000 million, this being five £10 million maturity loans from
PWLB drawn on 16 December 2021 with loan tenors of between
42 and 50 years at interest rates of between 1.26% and 1.36%,
drawing down long term loan funding to de-risk the funding of
the Council’s General Services and HRA capital plan at
historically low PWLB rates.  The cash saving to the Council in
interest costs over the life of these loans, compared to borrowing
from PWLB at the time of writing this report for Audit Committee
(17 June 2022), is £44.921 million; 
• During 2021/22, the Council fully funded its borrowing
requirement.  This meant that the capital borrowing need (the
Capital Financing Requirement) was fully funded with loan debt,
and the Council was able to secure loans at historically low
PLWB rates; 
• Total long term borrowing maturing in the year amounted to
£1.523 million, comprising the following:-
o One £0.648 million Maturity Loan with PWLB matured on
3 August 2021 (original tenor 27 years at an interest rate
of 8.50%);
o £0.044 million of PWLB Annuities of various tenors and
interest rates;
o £0.649 million of Annuity and EIP, and £0.183 million of
interest free loans. 
• The average rate of interest paid on external debt was 3.22% in
2021/22, down from 3.31% in 2020/21 and reflecting the
historically low interest rates secured on longer-term PWLB
borrowing in 2021/22; 
• Three deposits were placed with high credit-worthy banks, which
matured on 17 June 2022 and secured an interest rate return on
surplus funds during the period of deposit; 
• The average rate of return on deposits was 0.79% in 2021/22,
exceeding the benchmark of 0.34% for the eighteenth year in
succession;
Page 44 of 340

Page 45

3 
• Cash balances in instant access accounts throughout the year
were significantly higher than normal, and reflective of (a) the
Scottish Government providing upfront funding to local
authorities to support a range of grant schemes, in particular
schemes to support local businesses; (b) advanced Revenue
Support Grant payments and Early Years Capital Grant
payments in 2021/22, (c) developer contribution receipts, (d)
PWLB borrowing taken in advance, and (d) the continued impact
of Covid on the Council’s cashflow due to rephasing of capital
expenditure plans.  The level of higher cash balances that are
being held are fully committed to fund revenue an capital
expenditure in the 2022/23 and forthcoming financial years.
Page 45 of 340

Page 46

4
• No debt rescheduling was undertaken during 2021/22. 
A detailed report “Annual Treasury Management Review 2021/22” on the
activity during 2021/22 is attached as Appendix 2. 
The Treasury Portfolio at the start and end of the financial year is shown
in Tables 1 and 2 below. 
Table 1: Loan Portfolio at 1 April 2021 and 31 March 2022 
Loan Type
Principal
Outstanding
1 Apr 2021
£000’s
Principal
Outstanding
31 Mar 2022
£000’s
Movement 
£000’s
PWLB Annuity 597 553 -44
PWLB Maturity 235,424 284,776 +49,352
LOBO 20,000 20,000 0
Forward Starting Loans 18,191 17,542 -648
Temporary Market Loans 0 0 0
Salix Loans 583 400 -183
Total Loans 274,795 323,271 +48,476 
Table 2: Deposits at 1 April 2021 and 31 March 2022 
Deposit Type
Principal
Outstanding
1 Apr 2021
£000’s
Principal
Outstanding
31 Mar 2022
£000’s
Movement 
£000’s
Bank Call Accounts 26,470 31,059 +4,589
Money Market Funds 29,818 30,324 +506
Bank Notice Accounts 14,985 14,985 0
Bank Fixed Term Deposit Accounts 0 35,000 +35,000
Other Local Authorities 60,000 45,000 -15,000
Total Deposits 131,273 156,367 +25,095 
Throughout 2021/22, all counterparties that the Council placed deposits
with met their obligations in respect of the return of the deposited funds
in full and on the required dates. 
4. Other Issues 
The Code recommends that Treasury reports are presented to and
scrutinised by Audit Committee in advance of being considered by
Council. 
The report is being presented to Audit Committee on 29 June 2022 and
subsequently to Council, and will be updated to reflect any comments
that the Audit Committee have. 
In late December 2021, CIPFA published the new Prudential Code and
Treasury Management Code of Practice.  Both these documents are an
update on the 2017 equivalent documentation, both of which the Council
follows fully.  In addition, CIPFA published the accompanying Guidance
Page 46 of 340

Page 47

5
Note to the Treasury Management Code of Practice, which sets out in
more detail the requirements of the updated code. 
An update on the main changes to the Prudential Code and Treasury
Management Code of Practice was outlined in the Treasury
Management & Investment Strategy & Prudential Indicators 2022-23
report to Audit Committee on 25 January 2022 and Council on 15
February 2022. 
There are no fundamental or material changes to either the Prudential
Code or Treasury Management Code that materially impact on the
Council’s Treasury Management & Annual Investment Strategy 2022/23
nor the Treasury Management Outturn Report.  Therefore, the current
policy framework as set out in the TMIS 2022/23 remains relevant with
no changes, and there is no impact on any day to day treasury
operations. 
Council officers are currently working with Link, the Council’s Treasury
advisers, to provide a full and comprehensive update to the Council’s
Treasury Management Practices.  The updated version of these
practices will be brought to the next meeting of the Audit Committee on
27 September 2022 for scrutiny. 
5 Report Implications (Resource, Digital and Risk) 
5.1 Resource 
Treasury Management activity during the year, in accordance with the
approved strategy, has once again been effective in minimising the cost
of borrowing and maximising the return on deposits within the
parameters set by the strategy for the year. 
Although benefits from Treasury Management activity continue to accrue
there are no direct financial implications or other resource issues arising
from this report. 
The loan charges associated with Capital Expenditure and Treasury
Management activity during 2021/22 are reported in the Financial
Monitoring 2021/22 – General Fund Revenue report elsewhere on
today’s agenda. 
5.2 Digital 
None. 
5.3 Risk 
As the Council follows the requirements of the CIPFA Code of Practice
and the Prudential Code this minimises the risks involved in Treasury
Management activities place.  For those risks that do exist there are
robust and effective controls in place to further mitigate the level of risks.
These include further written Treasury Management Practices, which
define the responsibilities of all staff involved, and which are currently
Page 47 of 340

Page 48

6
being updated to reflect the provisions of the new Prudential and
Treasury Management Codes and will be presented to the next meeting
of Audit Committee. 
5.4 Ensuring Equalities (if required a separate IIA must be completed) 
This report does not recommend any change to policy or practice and
therefore does not require an Equalities Impact Assessment. 
5.5 Additional Report Implications 
See Appendix A 
Appendices:- 
Appendix 1: Loans Fund Rate Comparison with other Scottish Local Authorities
Appendix 2: Annual Treasury Management Review 2021/22
Appendix 3: Deposit Benchmarking Analysis 2021/22 
Page 48 of 340

Page 49

7
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value. 
A.5 Involving Communities and Other Stakeholders 
Although no external consultation has taken place, cognisance has
been taken of professional advice obtained from Link Asset Services,
the Council’s appointed Treasury Consultants. 
A.6 Impact on Performance and Outcomes 
The strategies adopted are an integral part of the corporate aim to
achieve Best Value as they seek to minimise the cost of borrowing by
exercising prudent debt management and placement of deposits. This
in turn helps to ensure that the Council’s capital expenditure is
sustainable in revenue terms. 
A.7 Adopting a Preventative Approach 
Not applicable. 
A.8 Supporting Sustainable Development 
Not applicable. 
Page 49 of 340

Page 50

8
Appendix 1:- 
Loans Fund Pooled Rate Comparison 2020/21 
The Pooled Loans Fund Rate combines the interest paid by the Council on
money borrowed, with the interest earned by the Council on money invested,
along with other charges such as internal interest allowed, premiums written
off and treasury-related expenses to arrive at a weighted average “loans fund
rate” figure for each authority, as noted in the final column above. 
Loans Fund Rate 2020/21
All Scottish Councils Pooled Rate
West Dunbartonshire 2.29%
Aberdeenshire 2.66%
Midlothian 2.98%
North Lanarkshire 3.03%
East Lothian 3.05%
Dumfries  & Galloway 3.14%
Perth & Kinross 3.15%
East Dunbartonshire 3.21%
Argyll & Bute 3.41%
Inverclyde 3.42%
East Ayrshire 3.50%
Falkirk 3.52%
Fife 3.53%
Dundee City 3.54%
Aberdeen City 3.58%
Renfrewshire 3.59%
South Ayrshire 3.64%
East Renfrewshire 3.67%
Scottish Borders 3.67%
Glasgow City 3.73%
Highland 3.73%
West Lothian 3.75%
Moray 3.87%
Stirling 3.87%
North Ayrshire 3.92%
Edinburgh City 4.26%
Angus 4.57%
Clackmannanshire 5.06%
Page 50 of 340

Page 51

Appendix 2 
Annual Treasury Management
Review 2021/22
Midlothian Council
June 2022 
Page 51 of 340

Page 52

Contents 
1 The Council’s Capital Expenditure and Financing 2021/22
2 The Council’s overall borrowing need
3 Treasury Position as at 31 March 2021
4 The Strategy for 2021/22
5 The Economy and Interest Rates
6 Borrowing Rates in 2021/22
7 Borrowing Outturn for 2021/22
8 Deposit Rates in 2021/22
9 Deposit Outturn for 2021/22
10 Performance Measurement
11 Conclusion 
Page 52 of 340

Page 53

This Council is required by regulations issued under the Local Government in
Scotland Act 2003 to produce an annual treasury management review of
activities and the actual prudential and treasury indicators for 2021/22. This
report meets the requirements of both the updated CIPFA Code of Practice on
Treasury Management, (the Code), and the updated CIPFA Prudential Code
for Capital Finance in Local Authorities, (the Prudential Code).
During 2021/22 the minimum reporting requirements were that the full Council
should receive the following reports:
• an annual treasury strategy in advance of the year (Council
23/02/2021);
• a mid-year, (minimum), treasury update report (Council 14/12/2021);
• an annual review following the end of the year describing the activity
compared to the strategy, (this report);
The regulatory environment places responsibility on members for the review
and scrutiny of treasury management policy and activities.  This report is,
therefore, important in that respect, as it provides details of the outturn position
for treasury activities and highlights compliance with the Council’s policies
previously approved by members.  
This Council confirms that it has complied with the requirement under the Code
to give prior scrutiny to all of the above treasury management reports by the
Audit Committee before they are reported to the full Council.  
Page 53 of 340

Page 54

1. The Council’s Capital Expenditure and Financing
2021/22
The Council undertakes capital expenditure on long-term assets.  These
activities may either be:
• Financed immediately through the application of capital or revenue
resources (capital receipts, capital grants, revenue contributions etc.), which
has no resultant impact on the Council’s borrowing need; or
• If insufficient financing is available, or a decision is taken not to apply
resources, the capital expenditure will give rise to a borrowing need.
The actual capital expenditure forms one of the required prudential indicators. 
The table below shows the actual capital expenditure and how this was
financed. 
2020/21 2021/22 2021/22
Actual Budget Actual
£000 £000 £000
General Fund
Capital Expenditure 25,570 36,346 23,386
Available Funding 15,612 22,068 17,368
Borrowing Required 9,958 14,278 6,018
HRA
Capital Expenditure 15,632 107,271 39,477
Available Funding 9,241 22,714 32,979
Borrowing Required 6,391 84,557 6,498
General Fund and HRA
Capital Expenditure 41,202 143,617 62,863
Available Funding 24,853 44,782 50,347
Borrowing Required 16,349 98,835 12,516
Table 1: Capital Expenditure + Financing
Page 54 of 340

Page 55

2. The Council’s Overall Borrowing Need
The Council’s underlying need to borrow for capital expenditure is termed the
Capital Financing Requirement (CFR).  This figure is a gauge of the Council’s
indebtedness.  The CFR results from the capital activity of the Council and what
resources have been used to pay for the capital spend.  It represents the
2021/22 unfinanced capital expenditure (see above table), plus prior years’ net
or unfinanced capital expenditure which has not yet been paid for by revenue
or other resources. 
Part of the Council’s treasury activities is to address the funding requirements
for this borrowing need.  Depending on the capital expenditure programme, the
treasury service organises the Council’s cash position to ensure sufficient cash
is available to meet the capital plans and cash flow requirements.  This may be
sourced through borrowing from external bodies (such as the Government,
through the Public Works Loan Board [PWLB] or the money markets), or
utilising temporary cash resources within the Council. 
Reducing the CFR – the Council’s underlying borrowing need (CFR) is not
allowed to rise indefinitely.  Statutory controls are in place to ensure that capital
assets are broadly charged to revenue over the life of the asset.  The Council
is required to make an annual revenue charge, called the Scheduled Debt
Amortisation (or loans repayment), to reduce the CFR.  This is effectively a
repayment of the borrowing need. This differs from the treasury management
arrangements which ensure that cash is available to meet capital commitments. 
External debt can also be borrowed or repaid at any time, but this does not
change the CFR. 
The total CFR can also be reduced by:
• the application of additional capital financing resources (such as unapplied
capital receipts); or 
• charging more than the minimum loan repayment each year through an
additional revenue charge. 
The Council’s CFR for the year is shown below, and represents a key prudential
indicator. 
Borrowing activity is constrained by prudential indicators for net borrowing and
the CFR, and by the authorised limit.
31-Mar-21 2021/22 31-Mar-22
Actual Budget Actual
£000 £000 £000
Opening balance 283,384£   307,354£  283,384£  
Add Borrowing Required 17,900£     98,835£    12,516£    
Less scheduled debt amortisation (8,170)£      (9,594)£     (5,670)£     
Closing balance 283,384£   396,595£  290,230£  
Table 2: Council's Underlying Borrowing Requirement
CFR:
Page 55 of 340

Page 56

Gross borrowing and the CFR - in order to ensure that borrowing levels are
prudent over the medium term and only for a capital purpose, the Council
should ensure that its gross external borrowing does not, except in the short
term, exceed the total of the capital financing requirement in the preceding year
(2020/21) plus the estimates of any additional capital financing requirement for
the current (2021/22) and next three financial years.  This essentially means
that the Council is not borrowing to support revenue expenditure.  This indicator
allows the Council some flexibility to borrow in advance of its immediate capital
needs in 2021/22.  The table below highlights the Council’s gross borrowing
position against the CFR (excluding PFI schemes).  The Council has complied
with this prudential indicator. 
The authorised limit – this Council has kept within its authorised external
borrowing limit as shown by the table below.  Once this has been set, the
Council does not have the power to borrow above this level. 
The operational boundary – the operational boundary is the expected
borrowing position of the Council during the year.  Periods where the actual
position is either below or over the boundary is acceptable subject to the
authorised limit not being breached. 
31-Mar-21 2021/22 31-Mar-22
Actual Budget Actual
£000 £000 £000
Gross Borrowing 274,795£   363,996£  323,271£  
CFR 283,384£   396,595£  290,230£  
Table 3: Council's Gross Borrowing Position
2021/22
Authorised limit - borrowing £   676,508
Operational boundary - borrowing £   396,596
Maximum gross borrowing position £   323,450
Average gross borrowing position £   288,364
Table 4: Gross Borrowing against
Authorised Limit / Operational Boundary
Page 56 of 340

Page 57

3. Treasury Position as at 31 March 2021
The Council’s debt and investment position is organised by the treasury
management service in order to ensure adequate liquidity for revenue and
capital activities, security for investments and to manage risks within all treasury
management activities. Procedures and controls to achieve these objectives
are well established both through Member reporting detailed in the Purpose
section of this report, and through officer activity detailed in the Council’s
Treasury Management Practices.  At the beginning and the end of 2021/22 the
Council‘s treasury (excluding borrowing by PFI and finance leases) position
was as follows: 
31 March
2021
Principal
Rate/
Return
Average
Life
(Yrs)
31 March
2022
Principal
Rate/
Return
Average
Life
(Yrs)
Debt
Fixed Rate Debt
PWLB 236,021£    3.30% 31.36 285,328£    2.71% 33.13
Market 23,774£      2.92% 30.49 22,943£      2.95% 29.49
Total Fixed Rate Debt 259,795£    3.27% 31.28 308,271£    2.73% 32.86
Variable Rate Debt
PWLB -£                  n/a n/a -£                  n/a n/a
Market 15,000£      4.63% 29.71 15,000£      4.63% 28.71
Total Variable Rate Debt 15,000£      4.63% 29.71 15,000£      4.63% 28.71
Total debt/gross borrowing 274,795£   3.34% 31.19 323,271£   2.82% 32.67
CFR 283,384£   290,230£  
Over/ (under) borrowing (8,589)£      33,041£     
Deposits
Fixed Rate Deposits
In House 60,000£      1.62% 1.41 80,000£      1.06% 0.41
With Managers -£                  n/a n/a -£                  n/a n/a
Total Fixed Rate Deposits 60,000£      1.62% 1.41 80,000£      1.06% 0.41
Variable Rate Deposits
In House 71,272£      0.13% 0.11 76,367£      0.61% 0.10
With Managers -£                  n/a n/a -£                  n/a n/a
Total Variable Rate Deposits 71,272£      0.13% 0.11 76,367£      0.61% 0.10
Total Deposits 131,272£   0.81% 0.70 156,367£   0.84% 0.26
Table 5: Treasury Position
Page 57 of 340

Page 58

The maturity structure of the debt portfolio was as follows: 
The maturity structure of the Council’s deposits was as follows: 
The exposure to fixed and variable interest rates on debt was as follows:- 
£000 % £000 %
Under 12 months 1,471£       1% 0% to 50% 1,465£       0%
12 months to 2 years 1,465£       1% 0% to 50% 830£          0%
2 years to 5 years 3,624£       1% 0% to 50% 3,553£       1%
5 years to 10 years 23,923£    9% 0% to 50% 33,857£    10%
10 years to 20 years 53,308£    19% 0% to 50% 43,421£    13%
20 years to 30 years 13,421£    5% 0% to 50% 12,563£    4%
30 years to 40 years 95,534£    35% 0% to 50% 95,534£    30%
40 years to 50 years 77,049£    28% 0% to 50% 127,048£  39%
50 years and above 5,000£       2% 0% to 50% 5,000£       2%
Total 274,795£  100% 323,271£  100%
%
Table 6: Maturity Structure of Debt Portfolio
31-Mar-21 2021/22 31-Mar-22
Actual Original Limits Actual
31-Mar-21 31-Mar-22
£000 £000
Deposit
Under 1 Year 71,272£     154,367£  
Over 1 Year 60,000£     2,000£       
Total 131,272£   156,367£  
Table 7: Maturity Structure
of Deposit Portfolio
£000 % £000 %
Fixed Interest Rate Exposure £259,795 95% 0% to 100% 308,271£ 95%
Variable Interest Rate Exposure £   15,000 5% 0% to 30% 15,000£   5%
Total 274,795£ 100% 323,271£ 100%
%
Table 8: Fixed/Variable Interest Rate Exposure of Debt Portfolio
31-Mar-21 2021/22 31-Mar-22
Actual Original Limits Actual
Page 58 of 340

Page 59

4. The Strategy for 2021/22
During 2021/22, the Council fully funded its borrowing requirement.  This meant
that the capital borrowing need, (the Capital Financing Requirement), was fully
funded with loan debt, and the Council was able to source loans at historically
low PWLB rates. 
Interest rate forecasts within the Treasury Management & Investment Strategy
expected only gradual rises in medium and longer term fixed borrowing rates
during 2021/22 and the two subsequent financial years.  Variable, or short-term
rates, were expected to be the cheaper form of borrowing over the period.   
Return on funds placed on deposit which had been low during 2020/21,
continued to remain low during much of 2021/22 at near zero or even into
negative territory, before rising in line with base rate increases from December
2021. 
The expectation for interest rates within the treasury management strategy for
2021/22 was that Bank Rate would continue throughout the year at 0.10%.  This
forecast was changed when the Bank of England increased base rate in
December 2021, raising it to 0.25% at its meeting on 16th December 2021, 
0.50% at its meeting of 4th February 2022 and then to 0.75% in March 2022 as
a result of emerging inflation pressures in the economy. 
Link Group Interest Rate View  9.11.20
Dec-20 Mar-21 Jun-21 Sep-21 Dec-21 Mar-22 Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 Sep-23 Dec-23 Mar-24
BANK RATE 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
3 month ave earnings 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
6 month ave earnings 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
12 month ave earnings 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
5 yr   PWLB 1.80 1.80 1.80 1.80 1.80 1.90 1.90 1.90 1.90 1.90 2.00 2.00 2.00 2.00
10 yr PWLB 2.10 2.10 2.10 2.10 2.20 2.20 2.20 2.30 2.30 2.30 2.30 2.30 2.30 2.30
25 yr PWLB 2.50 2.50 2.60 2.60 2.60 2.60 2.70 2.70 2.70 2.70 2.80 2.80 2.80 2.80
50 yr PWLB 2.30 2.30 2.40 2.40 2.40 2.40 2.50 2.50 2.50 2.50 2.60 2.60 2.60 2.60
Link Group Interest Rate View  7.2.22
Mar-22 Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 Sep-23 Dec-23 Mar-24 Jun-24 Sep-24 Dec-24 Mar-25
BANK RATE 0.75 1.00 1.00 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
3 month av. earnings 0.80 1.00 1.00 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
6 month av. earnings 1.00 1.10 1.20 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30
12 month av. earnings 1.40 1.50 1.60 1.70 1.70 1.60 1.60 1.50 1.40 1.40 1.40 1.40 1.40
5 yr   PWLB 2.20 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30
10 yr PWLB 2.30 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40
25 yr PWLB 2.40 2.50 2.50 2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60
50 yr PWLB 2.20 2.30 2.30 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40
Page 59 of 340

Page 60

5. The Economy and Interest Rates
UK
Over the last two years, the coronavirus outbreak has done huge economic
damage to the UK and to economies around the world. After the Bank of
England took emergency action in March 2020 to cut Bank Rate to 0.10%, it
left Bank Rate unchanged at its subsequent meetings until raising it to 0.25%
at its meeting on 16th December 2021,  0.50% at its meeting of 4th February
2022 and then to 0.75% in March 2022. 
The UK economy has endured several false dawns through 2021/22, but with
most of the economy now opened up and nearly back to business-as-usual, the
GDP numbers have been robust (9% y/y Q1 2022) and sufficient for the MPC
to focus on tackling the second-round effects of inflation, now that the CPI
measure has already risen to 6.2% and is likely to exceed 8% in April. 
Gilt yields fell towards the back end of 2021, but despite the war in Ukraine gilt
yields have shot higher in early 2022.  At 1.38%, 2-year yields remain close to
their recent 11-year high and 10-year yields of 1.65% are close to their recent
six-year high. These rises have been part of a global trend as central banks
have suggested they will continue to raise interest rates to contain inflation. 
Historically, a further rise in US Treasury yields will probably drag UK gilt yields
higher.  There is a strong correlation between the two factors.   However, the
squeeze on real household disposable incomes arising from the 54% leap in
April utilities prices as well as rises in council tax, water prices and many phone
contract prices, are strong headwinds for any economy to deal with.  In addition,
from 1st April 2022, employees also pay 1.25% more in National Insurance tax. 
Consequently, inflation will be a bigger drag on real incomes in 2022 than in
any year since records began in 1955. 
Average inflation targeting. This was the major change in 2020/21 adopted by
the Bank of England in terms of implementing its inflation target of 2%.   The
key addition to the Bank’s forward guidance in August 2020 was a new phrase
in the policy statement, namely that “it does not intend to tighten monetary
policy until there is clear evidence that significant progress is being made in
eliminating spare capacity and achieving the 2% target sustainably”.  That
mantra now seems very dated.  Inflation is the “genie” that has escaped the
bottle, and a perfect storm of supply side shortages, labour shortages,
commodity price inflation, the impact of Russia’s invasion of Ukraine and
subsequent Western sanctions all point to inflation being at elevated levels until
well into 2023. 
USA
The flurry of comments from Fed officials following the mid-March FOMC
meeting – including from Chair Jerome Powell himself – hammering home the
hawkish message from the mid-March meeting, has had markets pricing in a
further 225bps of interest rate increases in 2022 on top of the initial move to an
interest rate range of 0.25% - 0.5%. 
Page 60 of 340

Page 61

In addition, the Fed is expected to start to run down its balance sheet.  Powell
noted that the rundown could come as soon as the next meeting in May. 
The upward pressure on inflation from higher oil prices and potential knock-on
impacts on supply chains all argue for tighter policy (CPI is estimated at 7.8%
across Q1), but the hit to real disposable incomes and the additional uncertainty
points in the opposite direction. 
More recently, the inversion of the 10y-2y Treasury yield spread at the end of
March led to predictable speculation that the Fed’s interest rate hikes would
quickly push the US economy into recession. Q1 GDP growth is likely to be
only between 1.0% and 1.5% annualised (down from 7% in Q4 2021). But, on
a positive note, the economy created more than 550,000 jobs per month in Q1,
a number unchanged from the post-pandemic 2021 average.   Unemployment
is only 3.8%. 
EU
With euro-zone inflation having jumped to 7.5% in March it seems increasingly
likely that the ECB will accelerate its plans to tighten monetary policy. It is likely
to end net asset purchases in June – i.e., earlier than the Q3 date which the
ECB targeted in March. And the market is now anticipating possibly three 25bp
rate hikes later this year followed by more in 2023.  Policymakers have also
hinted strongly that they would re-start asset purchases if required. In a recent
speech, Christine Lagarde said “we can design and deploy new instruments to
secure monetary policy transmission as we move along the path of policy
normalisation.” 
While inflation has hit the headlines recently, the risk of recession has also been
rising. Among the bigger countries, Germany is most likely to experience a
“technical” recession because its GDP contracted in Q4 2021, and its
performance has been subdued in Q1 2022. However, overall, Q1 2022 growth
for the Eurozone is expected to be 0.3% q/q with the y/y figure posting a healthy
5.2% gain.  Finishing on a bright note, unemployment fell to only 6.8% in
February. 
China
After a concerted effort to get on top of the virus outbreak in Q1 of 2020,
economic recovery was strong in the rest of the year; however, 2021 has seen
the economy negatively impacted by political policies that have focussed on
constraining digital services, restricting individual freedoms, and re-establishing
the power of the One-Party state.  With the recent outbreak of Covid-19 in large
cities, such as Shanghai, near-term economic performance is likely to be
subdued. Official GDP numbers suggest growth of c4% y/y, but other data
measures suggest this may be an overstatement. 
Japan
The Japanese economic performance through 2021/22 is best described as
tepid.  With a succession of local lockdowns throughout the course of the year,
GDP is expected to have risen only 0.5% y/y with Q4 seeing a minor
Page 61 of 340

Page 62

contraction.  The policy rate has remained at -0.1%, unemployment is currently
only 2.7% and inflation is sub 1%, although cost pressures are mounting. 
World growth
World growth is estimated to have expanded 8.9% in 2021/22 following a
contraction of 6.6% in 2020/21. 
Deglobalisation
Until recent years, world growth has been boosted by increasing globalisation
i.e. countries specialising in producing goods and commodities in which they
have an economic advantage and which they then trade with the rest of the
world. This has boosted worldwide productivity and growth, and, by lowering
costs, has also depressed inflation. However, the rise of China as an economic
superpower over the last 30 years, which now accounts for 18% of total world
GDP (the USA accounts for 24%), and Russia’s recent invasion of Ukraine, has
unbalanced the world economy. In addition, after the pandemic exposed how
frail extended supply lines were around the world, both factors are now likely to
lead to a sharp retrenchment of economies into two blocs of western
democracies v. autocracies. It is, therefore, likely that we are heading into a
period where there will be a reversal of world globalisation and a decoupling of
western countries from dependence on China (and to a much lesser extent
Russia) to supply products and vice versa. This is likely to reduce world growth
rates. 
Central banks’ monetary policy
During the pandemic, the governments of western countries have provided
massive fiscal support to their economies which has resulted in a big increase
in total government debt in each country. It is therefore very important that bond
yields stay low while debt to GDP ratios slowly subside under the impact of
economic growth. This provides governments with a good reason to amend the
mandates given to central banks to allow higher average levels of inflation than
we have generally seen over the last couple of decades. Both the Fed and Bank
of England have already changed their policy towards implementing their
existing mandates on inflation, (and full employment), to hitting an average level
of inflation. Greater emphasis could also be placed on hitting subsidiary targets
e.g. full employment before raising rates. Higher average rates of inflation
would also help to erode the real value of government debt more quickly. 
Page 62 of 340

Page 63

6. Borrowing Rates in 2021/22
PWLB rates are based on gilt (UK Government bonds) yields through
H.M.Treasury determining a specified margin to add to gilt yields.  The main
influences on gilt yields are Bank Rate, inflation expectations and movements
in US treasury yields. Inflation targeting by the major central banks has been
successful over the last 30 years in lowering inflation and the real equilibrium
rate for central rates has fallen considerably due to the high level of borrowing
by consumers: this means that central banks do not need to raise rates as much
now to have a major impact on consumer spending, inflation, etc. This has
pulled down the overall level of interest rates and bond yields in financial
markets over the last 30 years.  We have seen, over the last two years, many
bond yields up to 10 years in the Eurozone turn negative on expectations that
the EU would struggle to get growth rates and inflation up from low levels. In
addition, there has, at times, been an inversion of bond yields in the US
whereby 10 year yields have fallen below shorter term yields. In the past, this
has been a precursor of a recession.  Recently, yields have risen since the turn
of the year on the back of global inflation concerns. 
Graph of UK gilt yields v. US treasury yields   
Gilt yields fell sharply from the spring of 2021 through to September and then
spiked back up before falling again through December.  However, by January
sentiment had well and truly changed, as markets became focussed on the
embedded nature of inflation, spurred on by a broader opening of economies
post the pandemic, and rising commodity and food prices resulting from the
Russian invasion of Ukraine. 
At the close of the day on 31 March 2022, all gilt yields from 1 to 5 years were
between 1.11% – 1.45% while the 10-year and 25-year yields were at 1.63%
and 1.84%. 
0.25
0.75
1.25
1.75
2.25
2.75
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
Dec-19 Mar-20 Jun-20 Sep-20 Dec-20 Mar-21 Jun-21 Sep-21 Dec-21 Mar-22 Jun-22
10 year Treasury yield (%)
10 year Gilt yield (%)
Gilts Forwards - Gilts Treasuries Forwards - Treasuries
Page 63 of 340

Page 64

Regarding PWLB borrowing rates, the various margins attributed to their pricing
are as follows: - 
• PWLB Standard Rate is gilt plus 100 basis points (G+100bps)
• PWLB Certainty Rate is gilt plus 80 basis points (G+80bps)
• PWLB HRA Standard Rate is gilt plus 100 basis points (G+100bps)
• PWLB HRA Certainty Rate is gilt plus 80bps (G+80bps)
• Local Infrastructure Rate is gilt plus 60bps (G+60bps) 
There is likely to be a further rise in short dated gilt yields and PWLB rates over
the next three years.  Medium to long dated yields are driven primarily by
inflation concerns but the Bank of England is also embarking on a process of
Quantitative Tightening whereby the Bank’s £895bn stock of gilt and corporate
bonds will be sold back into the market over several years.  The impact this
policy will have on the market pricing of gilts, while issuance is markedly
increasing, is an unknown at the time of writing. 
HIGH/LOW/AVERAGE PWLB RATES FOR 2021/22 
0.60%
0.80%
1.00%
1.20%
1.40%
1.60%
1.80%
2.00%
2.20%
2.40%
2.60%
2.80%
3.00%
PWLB Rates 1.4.21 - 31.03.22
1 Year 5 Year 10 Year 25 Year 50 Year 50 year target %
1 Year 5 Year 10 Year 25 Year 50 Year
01/04/2021 0.80% 1.20% 1.73% 2.22% 2.03%
31/03/2022 1.91% 2.25% 2.43% 2.64% 2.39%
Low 0.78% 1.05% 1.39% 1.67% 1.25%
Low date 08/04/2021 08/07/2021 05/08/2021 08/12/2021 09/12/2021
High 2.03% 2.37% 2.52% 2.75% 2.49%
High date 15/02/2022 28/03/2022 28/03/2022 23/03/2022 28/03/2022
Average 1.13% 1.45% 1.78% 2.10% 1.85%
Spread 1.25% 1.32% 1.13% 1.08% 1.24%
Page 64 of 340

Page 65

7. Borrowing Outturn for 2021/22
New Treasury Borrowing:- 
New loans were drawn to fund the net unfinanced capital expenditure and
naturally maturing debt. 
The loans drawn were:- 
Maturing Debt:- 
The following table gives details of treasury debt maturing during the year:- 
Rescheduling:- 
No rescheduling was done during the year as the average 1% differential
between PWLB new borrowing rates and premature repayment rates made
rescheduling unviable. 
Summary of debt transactions:- 
The average interest rate payable on external debt decreased from 3.34% at
the start of 2021/22 to 3.22% at the end of 2021/22.  The average life of debt
within the loan portfolio lengthened from 31.16 years to 32.66 years. 
Lender Date
Taken
Principal
£000's
Interest
Rate
Fixed/
Variable
Maturity
Date
Term
(Yrs)
PWLB Maturity 16 Dec 2021 £  10,000 1.26% Fixed 16 Dec 2071 50.00
PWLB Maturity 16 Dec 2021 £  10,000 1.27% Fixed 16 Dec 2070 49.00
PWLB Maturity 16 Dec 2021 £  10,000 1.30% Fixed 16 Dec 2067 46.00
PWLB Maturity 16 Dec 2021 £  10,000 1.34% Fixed 16 Dec 2064 43.00
PWLB Maturity 16 Dec 2021 £  10,000 1.36% Fixed 16 Dec 2063 42.00
Total £  50,000
Table 9: New Loans Taken in Financial Year 2021/22
Lender Date
Repaid
Principal
£000's
Interest
Rate
Fixed/
Variable
Date
Originally
Taken
Original
Term
(Yrs)
PWLB 03 Aug 2021 £        648 8.50% Fixed 16 Aug 1994 27.00
PWLB Annuities Various £          44 7.75%-9.50% Fixed 02 Aug 1968 to
15 May 1972 56-60 years
Salix Various £        183 0.00% Fixed Various 7-8 years
Deutsche Pfandbriefbank Various £        357 2.63% Fixed 29 Jun 2017 28.00
Deutsche Pfandbriefbank Various £        291 2.73% Fixed 15 Nov 2018 25.50
Total £     1,523
Table 10: Maturing Debt in Financial Year 2021/22
Page 65 of 340

Page 66

8. Deposit Rates in 2021/22
Money market fund rates started the year at 0.01%, remaining at this level
until the bank of England base rate increases in the latter half of the year,
before trending upwards to end the year at 0.51%-0.53%. 
-0.20
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
Bank Rate vs term SONIA rates % 1.4.21 - 31.3.22
Bank Rate SONIA 1 mth 3 mth 6 mth
Bank Rate SONIA 1 mth 3 mth 6 mth
High 0.75 0.69 0.75 0.93 1.27
High Date 17/03/2022 18/03/2022 16/03/2022 28/03/2022 17/03/2022
Low 0.10 0.05 0.05 0.05 0.05
Low Date 01/04/2021 15/12/2021 10/11/2021 14/04/2021 09/04/2021
Average 0.19 0.14 0.17 0.24 0.34
Spread 0.65 0.65 0.71 0.88 1.22
Page 66 of 340

Page 67

9. Funds on Deposit Outturn for 2021/22
Deposit Policy:- 
The Council’s policy for placing deposits is governed by Scottish Government
Investment Regulations, which have been implemented in the annual
investment strategy approved by the Council on 23 February 2021.  This policy
sets out the approach for choosing counterparties, and for financial institutions
is based on credit ratings provided by the three main credit rating agencies
supplemented by additional market data (such as rating outlooks, credit default
swaps, bank share prices etc.). 
The activity during the year conformed to the approved strategy, and the
Council had no liquidity difficulties.  The position at 31 March 2022 was as
follows:- 
Deposits placed by the Council:- 
The Council maintained an average balance of £144.6 million of internally
managed funds.  The internally managed funds earned an average rate of
return of 0.79%.  The comparable performance indicator is the average 6-month
SONIA un-compounded rate, which was 0.34%.  
Counterparty
Deposit
Start
Date
Deposit
End
Date
Principal
Outstanding
31 Mar 2022
£000's
Royal Bank of Scotland 1,143            
Bank of Scotland 29,915         
MMF - Aberdeen Liquidity Fund 7,846            
MMF - Federated 7,623            
MMF - Legal & General 14,855         
Santander 14,985         
Wokingham Borough Council 25-Mar-20 24-Mar-23 15,000         
London Borough of Croydon Council 03-Apr-20 03-Oct-22 13,000         
Stoke on Trent City Council 06-Apr-20 06-Apr-23 2,000            
London Borough of Waltham Forest Council 30-Apr-20 29-Apr-22 15,000         
Goldman Sachs International Bank 17-Dec-21 17-Jun-21 15,000         
Standard Chartered Bank 17-Dec-21 17-Jun-21 15,000         
National Bank of Canada 17-Dec-21 17-Jun-21 5,000            
Total Deposits 156,367       
Table 11: Breakdown of Deposits by Counterparty at 31 March 2022
180 Day Notice Account
Instant Access Money Market Fund
Instant Access Money Market Fund
Instant Access Money Market Fund
Instant Access Call Account
Instant Access Call Account
Page 67 of 340

Page 68

10. Performance Measurement
One of the key requirements in the Code is the formal introduction of
performance measurement relating to investments, debt and capital financing
activities. 
Loans Fund Rate 
Combining the interest paid (earned) on external debt (deposits) with charges
for premiums written off and internal interest allowed into an average Loans
Fund Rate, Midlothian’s result of 2.98% for 2020/21 was the third lowest Loans
Fund Rate amongst all mainland authorities in Scotland (see Appendix 1). 
The comparative Loans Fund Rate for 2021/22, of 2.98%, is once again
expected to be one of the lowest when benchmarked against all mainland
authorities in Scotland (note that at present, these benchmark figures are not
yet available). 
Deposit Benchmarking 
The Council participates in the Scottish Investment Benchmarking Group set
up by its Treasury Management Consultants, Link.  This service provided by
Link provides benchmarking data to authorities for reporting and monitoring
purposes, by measuring the security, liquidity and yield within an individual
authority portfolio.  Based on the Council’s funds on deposit as at 31 March
2022, the Weighted Average Rate of Return (WARoR) on deposits of 0.82%
against other authorities is shown in the graph below:- 
* Models for 30 June 2021, 30 September 2021 and 31 December 2021
are attached as Appendix 3. 
As can be seen from the above graph, Midlothian is performing above the Link
model benchmarks (red to green lines), and is achieving one of the highest
Weighted Average Rates of Return (WARoR) for the Weighted Average Credit
Page 68 of 340

Page 69

Risk held, not only amongst peer Councils within the Benchmarking Group but
also amongst the population of authorities across the UK. 
Debt Performance 
Whilst deposit performance criteria have been well developed and universally
accepted, debt performance indicators continue to be a more problematic area
with the traditional average portfolio rate of interest acting as the main guide. 
In this respect, the relevant figures for Midlothian are incorporated in the table
in Section 3. 
Page 69 of 340

Page 70

11. Conclusion
The Council’s overall cost of borrowing continues to benefit significantly from
the approved strategy and the proactive Treasury Management activity
undertaken. 
The cost of long term borrowing has been maintained by taking up opportunities
to borrow from the PWLB at historically low interest rates. 
A better than average return on deposits has been achieved for the eighteenth
consecutive year and Midlothian continues to perform above the Link model
benchmarks and is achieving one of the highest Weighted Average Rates of
Return (WARoR) for the Weighted Average Credit Risk held, not only amongst
peer Councils within the Benchmarking Group but also amongst the population
of authorities across the UK. 
Overall Midlothian’s Loans Fund Rate of 2.98% for the year is expected to be
one of the lowest when benchmarked against all mainland Authorities in
Scotland. 
Page 70 of 340

Page 71

Appendix 3 
Midlothian Council Deposit Portfolio return as at 30 June 2021 
Page 71 of 340

Page 72

Midlothian Council Deposit Portfolio return as at 30 September 2021 
Page 72 of 340

Page 73

Midlothian Council Deposit Portfolio return as at 31 December 2021 
Page 73 of 340

Page 74

Page 74 of 340

Page 75

Midlothian Council
23 August 2022   
General Services Capital Plan – 2022/23 Quarter 1 Monitoring 
Report by Gary Fairley, Chief Officer Corporate Solutions 
Report for Noting 
1 Recommendations 
It is recommended that the Council:- 
1. Note the adjustment to the project expenditure budgets in the
General Services Capital Plan as set out in Section 3.1. 
2. Purpose of Report 
The purpose of this report is to provide Council with:- 
• An update of the General Services Capital Plan incorporating
information on further additions to the Capital Plan for approval
(Section 3);
• Information on the projected performance against budget for
2022/23 (Section 4);
• Update on the Capital Fund (Section 5). 
Date 04 August 2022
Report Contact:
Gary Thomson, Senior Accountant
gary.thomson@midlothian.gov.uk 
Item 8.3
Page 75 of 340

Page 76

2
3 Update of General Services Capital Plan 
3.1 Adjustments to existing project budgets 
The following adjustments to existing project expenditure and income
budgets are included in the General Services Capital Plan:- 
• Easthouses Primary School: The plan has been updated to reflect the
decision of Council on 28 June 2022. 
4 2022/23 Projection against budget 
4.1 2022/23 Budget 
After accounting for the following:- 
• Rephasing of budgets from 2021/22 to 2022/23, and new projects added
to the plan, both as reported to Council on 28 June 2022;
• Including the new projects & adjustments to project budgets as outlined in
Section 3;
• Rephasing of budgets based on the latest information available from
project managers as noted in Table 1 below 
the capital plan expenditure budget for 2022/23 is £54.036 million. 
Page 76 of 340

Page 77

3
Table 1: Rephasing of project expenditure budgets 
Project Description of rephasing of budget Previous
2022/23
Budget
£000’s
Revised
2022/23
Budget
£000’s
2022/23
Budget
Rephasing
£000’s
Woodburn Primary
School
Delay in land acquisition and resultant
extended programme, also due to market
volatility issues and value engineering
options
6,755 1,500 -5,255
Highbank Re-
provisioning
Intermediate Care
Rephasing of budget required due to three
extensions of time requested by the five
tendering contractors, who are
experiencing difficulty in tying down their
supply chain due to market issues
6,580 1,553 -5,027
Hopefield Farm
Primary 2 (HS12)
Revised planning assumption for site &
school delivery
1,347 0 -1,347
King’s Park
Primary School
Site complexity and planning implications
have impacted programme
1,918 600 -1,318
Easthouses
Primary School
Programme extended to work through
market volatility issues and value
engineering options
3,418 2,418 -1,000
St. David’s Primary
School
No immediate capacity pressure and
knock-on impact from delay to other
projects
622 225 -397
Mauricewood
Primary School
Project scope being reviewed 550 200 -350
Rosewell Primary
School
Current expansion option not feasible due
to site constraints.  Alternative sites being
investigated
550 250 -300
Others Other variances 649 0 -649
Total  22,389 6,746 -15,643 
In line with this, the expected level of funding available to finance the
plan has also been rephased and totals £30.991 million. 
This results in an in-year borrowing requirement of £23.044 million. 
The projected performance against budget for 2022/23 is shown in table
2 below:- 
Table 2: General Services Capital Plan Projected Performance
against Budget 2022/23 – as at Quarter 1 
Item 2022/23 Actual 2022/23 2022/23 2022/23
Rephased To Projected Variance Carry
Budget 19.06.22 Outturn £000’s Forward
£000’s £000’s £000’s £000’s
Expenditure 54,036 1,524 54,036 0 -15,643
Funding 30,991 1,826 30,991 0 -9,019
Borrowing
Required
23,044 -302 23,044 0 
Page 77 of 340

Page 78

4
4.2 Expenditure 
Expenditure to 19 June 2022 is £1.524 million with a projected
expenditure outturn of £54.036 million, in line with the rephased budget. 
4.3 Funding 
The funding available to finance the Capital Plan in 2022/23 is expected
to total £30.991 million.  Funding of £1.826 million has been received to
19 June 2022. 
4.4 Borrowing 
The budgeted level of borrowing for 2022/23 is £23.044 million.  Based
on the forecast expenditure and funding levels as noted above, the
revised estimate of the level of borrowing required for 2022/23 is
forecast to be £23.044 million, in line with budget.  The impact on the
Council’s borrowing costs is reflected in the Financial Monitoring
2022/23 General Fund Revenue report elsewhere on today’s agenda. 
5 Capital Fund 
The Capital Fund at the start of the 2022/23 financial year was £22.178
million.  £7.694 million of this is committed to fund the City Deal, with a
further £12.061 million committed to support capital investment including
the utilisation of £3.000 million in 2022/23. 
The forecast non-committed capital fund balance at 31 March 2023 is
£1.888 million, as shown in the table below. 
Item Amount
£000’s
Balance at 01 April 2022 22,178
Committed to fund City Deal Project -7,694
Committed to support Capital Investment1 -12,061
Developer Contributions earmarked for specific purposes -535
Non-committed balance at 31 March 2023 1,888 
Page 78 of 340

Page 79

5
6. Report Implications 
6.1 Resource 
The borrowing required to finance the planned investment in 2022/23 is
reflected in the Financial Monitoring 2022/23 – General Fund Revenue
report elsewhere on today’s agenda. 
6.2 Digital 
There are no Digital Services implications arising from this report. 
6.3 Risk 
The construction materials supply chain has already been subject to
unprecedented disruption and inflation pressures through a combination
of the Coronavirus (COVID-19) Pandemic, the conflict in the Ukraine and
the UK leaving the European Union.  The Construction Leadership
Council (CLC) continues to report shortages of construction materials
and forecasts this disruption to continue for the foreseeable future. 
Ongoing engagement with suppliers confirms that materials shortages,
longer lead times and steep price increases are highly likely to continue
to impact the supply chain. 
Factors contributing to pricing increases include contractors no longer
being able to absorb strong upward pressure from input costs, rising
demand, logistics problems and materials and labour shortages.  In
particular, materials prices are likely to be an ongoing concern due to
worldwide supply issues; and this is being reflected in recent tender
returns.  Tendering contractors are making specific reference to time
periods for the supply of labour and materials, a recent change in diesel
rules, the current conflict in Ukraine and potential shortages of materials
from China and elsewhere. 
Specific areas of major increases include groundworks, steel (structural
and steel product), metal cladding, timber, insulation and fire protection. 
This potentially exacerbates the inherent risk in the Capital Plan that
projects will cost more than estimated thus resulting in additional
borrowing, or will be subject to significant delay. 
The construction industry in Scotland and the UK is currently
experiencing unprecedented adverse market conditions, which is leading
to significant rises in tender prices for a wide range of materials. There is
evidence that inflation of between 10% and 15% beyond BCIS
predictions is affecting projects and whilst measures such as value
engineering and contract award review are partially mitigating cost
increase there is a risk that the capital budgets provided for delivery of
the project in the plan will need to be increased with a resultant impact
on the funding strategy. The situation is currently being monitored and
reviewed and an update will be provided to Council when the value of
the impact has been determined. 
Page 79 of 340

Page 80

6
Strengthened financial monitoring & governance procedures have been
approved by CP&AMB, which will ensure that significant variations can
be captured and reported to Programme Boards and CP&AMB so that
remedial action can be taken to mitigate the risks. 
In developing the strategy and taking cognisance of the longer term
affordability gap it is clear that a number of potential projects which are
currently included will only be able to be progressed if they can be
delivered on a spend to save basis (i.e. where income or cost savings
more than offset the cost of funding the investment) or where they can
be delivered on a cost neutral basis or through alternative funding
mechanisms. 
The current review of Statutory Capital Accounting arrangements has
brought increased uncertainty in respect of the affordability and financing
of the existing capital programme.  As such, officers will be seeking early
assurance that there would be transitional arrangements for any
changes arising from the review and that these would not only cover
existing assets but also any accounting changes arising from projects
already committed in the General Services Capital Plan for the current
and forthcoming 4 financial years.  Early assurance on what transitional
arrangements may apply would allow officers to determine and advise to
Council whether the current General Services Capital Plan remains
affordable and prudent. 
The Capital Plan includes a provision for the return of contingencies of
£5.753 million over the period 2022/23 to 2025/26, equating to 2.5% of
all project expenditure.  The risk is that projects throughout the plan are
unable to deliver this which could be in part due to factors outwith the
Council’s control.  Capital Plan & Asset Management Board will review
the level of return of contingencies against the £5.753 million provision
on an ongoing basis to ensure that projects can, where possible, deliver
against this provision and that the provision continues to be appropriate. 
6.4 Ensuring Equalities 
There are no equalities issues arising directly from this report. 
6.5 Additional Report Implications 
See Appendix A. 
Page 80 of 340

Page 81

7
Appendix A: Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable. 
A.2 Key Drivers for Change 
A.3 Key Delivery Streams 
Themes addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value. 
A.5 Involving Communities and Other Stakeholders 
No external consultation has taken place on this report. 
A.6 Impact on Performance and Outcome 
There are no issues arising directly from this report. 
A.7 Adopting a Preventative Approach 
Not applicable. 
A.8 Supporting Sustainable Development 
Not applicable. 
Page 81 of 340

Page 82

8 
Background Papers:
Appendix 1 –General Services Capital Plan 2022/23 – Quarter 1 Monitoring 
Page 82 of 340

Page 83

Appendix 1: General Services Capital Plan 2022/23 – Quarter 1
Monitoring 
Rephased
2021/22 2021/22 2021/22 2021/22 2021/22 2021/22
GENERAL SERVICES CAPITAL PLAN Budget Budget Actual Forecast Variance Carry
Q1 MONITORING Initial Q1 to P3 Outturn Q1 Q1 Forward Q1
£'000 £000's £000's £000's £000's £000's
PLACE DIRECTORATE
Corporate Solutions
Newbattle Centre of Excelllence 275 275 275 - -
Business Applications 8 8 10 8 - -
DS Corporate Solutions 616 616 616 - -
Front Office - Hardware, Software  & Services (179) (179) 96 (179) - -
Back Office - Hardware, Software & Services 1,384 1,384 (31) 1,384 - -
Network, Software & Services 578 578 3 578 - -
Schools - Hardware, Software  & Services 1,336 1,336 (30) 1,336 - -
Digital: Equipped for Learning 776 776 776 - -
Civica Automation 47 47 47 - -
Place - -
Street Lighting and Traffic Signal Upgrades - New 1,312 1,312 53 1,312 - -
Footway & Footpath Asset Management Plan - New 699 699 699 - -
Accelerated Roads Residential Streets 4,319 4,319 136 4,319 - -
Roads Asset Management Plan - New 1,838 1,838 47 1,838 - -
Roads Asset Management Plan - Temple Ground Stabilisation 309 309 309 - -
B6372 Arniston Embankment Stabilisation 593 593 593 - -
North Middleton Bridge 62 62 36 62 - -
A7 Urbanisation 106 106 106 - -
Cycling, Walking & Safer Streets Projects 596 596 596 - -
Ironmills Park Steps 7 7 7 - -
PNew recycling facility - Penicuik - - 14 - - -
Vehicle & Plant Replacement Programme 2,077 2,077 2,077 - -
Food Waste Rural Routes 132 132 132 - -
In-Cab Waste Collection Vehicles - - 1 - - -
LEZ Electric Vehicles & Charging Points 48 48 48 - -
Bus Priority Rapid Development - - - - -
School Transport Retrofit Fund 22 22 22 - -
Rosewell Road Toucan Crossing 50 50 50 - -
Outdoor Play Equipment - Rosewell 46 46 46 - -
Outdoor Play Equipment - Gorebridge 1 1 1 - -
Roslin Wheeled Sports Facility 60 60 60 - -
Mauricewood Road Bus Shelter 4 4 4 - -
Riverside Park Paths & Woodland 89 89 89 - -
Millerhill Park Circular Path & Bicycle Pump Track 18 18 18 - -
Welfare Park, Newtongrange 98 98 98 - -
Pump Track, North Middleton 76 76 76 - -
Play Park Renewal 2021/22 98 98 98 - -
Play Park Renewal 2022/23 97 97 97 - -
Nature Restoration Fund 2021/22 41 41 41 - -
Nature Restoration Fund 2022/23 103 103 103 - -
Birkenside Grass Pitch Drainage 12 12 12 - -
Open Spaces - Midlothian Wide Play Areas 338 338 338 - -
Stobhill Depot Upgrade 568 568 568 - -
New Depot: EWiM Phase III - - (47) - - -
Property Upgrades 1,283 1,283 1,283 - -
Midlothian & Fairfield House Shower Upgrades 5 5 5 - -
Shawfair Town Centre Land Purchase 5,165 5,165 106 5,165 - -
Destination Hillend 8,035 8,035 46 8,035 - -
32-38 Buccleuch Street Ground Floor Redevelopment 346 346 346 - -
Contaminated Land 186 186 186 - -
Public Sector Housing Grants 198 198 198 - -
Borders Rail - Economic Development Projects 125 125 125 - -
Penicuik THI 132 132 132 - -
Mayfield Town Centre Regeneration 4 4 4 - -
CCTV Network 472 472 472 - -
Place Based Investment Fund 2021/22 600 600 600 - -
Place Based Investment Fund 2022/23+ 534 534 534 - -
Town Centre Regeneration Fund 2020/21 91 91 (4) 91 - -
TOTAL PLACE 35,839 35,839 436 35,839 - -
Page 83 of 340

Page 84

10 
2022/23 2021/22 2021/22 2021/22 2021/22 2021/22
PEOPLE AND PARTNERSHIPS DIRECTORATE Budget Budget Actual Forecast Variance Carry
£'000 Q1 to P3 Outturn Q1 Q1 Forward Q1
Education - Early Years £000's £000's £000's £000's
King's Park Primary School 55 55 14 55 - -
Roslin Primary School 364 364 364 - -
Capital grants to partner providers 409 - - - 409
Hawthorn Children & Families Centre Alteration 164 164 4 164 - -
Mauricewood Primary School 247 247 247 - -
Vogrie Outdoor Early Learning Centre 81 81 81 - -
Other Outdoor Spaces 67 67 67 - -
Mount Esk Nursery School - - 13 - - -
Education - Primary
Paradykes Primary Replacement 144 144 0 144 - -
St. Mary’s RC & Early Burnbrae Primary Schools 140 140 140 - -
New Danderhall Primary hub 277 277 92 277 - -
Sacred Heart Primary School Extension 415 415 43 415 - -
Easthouses Primary School 3,418 2,418 2,418 - 1,000
Tynewater Primary School 10 10 10 - -
Burnbrae Primary School GP Space 2 2 2 - -
Woodburn Primary 9 class & activity hall extension 6,755 1,500 64 1,500 - 5,255
Education - Secondary - -
Lasswade High - Toilets & Changing to 1,600 pupil capacity 453 453 1 453 - -
A701 High School 1,054 1,054 130 1,054 - -
Education - Learning Estate Strategy
Kings Park PS upgrade to existing building 1,918 600 600 - 1,318
St Davids Primary - 4 class & EY extension 622 225 225 - 397
Hopefield Farm Primary 2 (HS12) 1,347 - - - 1,347
Mauricewood Refurbishment 550 200 200 - 350
Rosewell Primary School - extend to 2 stream 550 250 250 - 300
Newtongrange refurb & expansion to 2 stream 645 645 645 - -
Lasswade High - ASU 1,333 1,333 1,333 - -
ASN Provision - Social Complex Needs 250 250 250 - -
Strathesk Primary one class extension 214 214 214 - -
Mayfield School Campus replace & extend 15 15 15 - -
Learning Estate Strategy: Development Budget 1,222 1,222 37 1,222 - -
Bonnyrigg Primary - Modular Unit 562 562 562 - -
Hawthornden Primary - ASN Unit 492 492 23 492 - -
Burnbrae Primary - Conversion of ASN to GP Space 80 80 80 - -
Education - General
Saltersgate Alterations Phase III - Playground Improvements 138 138 2 138 - -
Saltersgate Phase IV - Internal Alterations 39 39 39 - -
Modular Units - Session 2017/18 107 107 107 - -
CO2 Monitors for Schools / Ventilation 21/22 Phase II 93 93 92 93 - -
Free School Meal Provision 324 324 324 - -
Children's Services
Residential House for 5-12 year olds 210 210 210 - -
Communities & Partnerships
Members Environmental Improvements 72 72 23 72 - -
Participatory Budgets 180 180 180 - -
Adult Social Care
Assistive Technology 176 176 176 - -
Homecare 55 55 55 - -
Highbank Intermediate Care Reprovisioning 6,580 1,553 (129) 1,553 - 5,027
General Fund Share of Extra Care Housing 297 297 186 297 - -
Sport & Leisure
Property - Poltonhall Astro & Training Area Resurfacing 384 384 475 384 - -
Property - Penicuik Astro Resurfacing 76 76 76 - -
Dalkeith Thistle - Pavilion Upgrade 6 6 6 - -
Loanhead Memorial Park Pitch 4 4 4 - -
Flotterstone Car Park Infrastructure & Charging 16 16 16 - -
Property - King's Park Tennis Courts Resurfacing 82 82 82 - -
Property - Penicuik Centre Flooring, Cardio & Equipment 178 178 178 - -
Property - Lasswade Centre Flooring 97 97 97 - -
Property - Gorebridge Leisure Centre 48 48 48 - -
Property - Loanhead Centre 2 2 2 - -
TOTAL PEOPLE AND PARTNERSHIPS 33,017 17,614 1,072 17,614 - 15,403
COUNCIL TRANSFORMATION
Purchase to Pay 2 2 2 - -
EWiM - Buccleuch House Ground Floor 33 33 33 - -
A701 & A702 Relief Road City Deal Project 1,532 1,532 17 1,532 - -
CCity Deal 240 - - - 240
TOTAL COUNCIL TRANSFORMATION 1,807 1,567 17 1,567 - 240
-
GENERAL SERVICES CAPITAL PLAN TOTAL 70,663 55,020 1,524 55,020 - 15,643
COST OF SALES
- - - - -
TOTAL COST OF SALES - - - - - -
-
GENERAL SERVICES CAPITAL PLAN TOTAL INC COST OF SALES 70,663 55,020 1,524 55,020 - 15,643
-
Provision for Return of Contingencies (985) (985) (985) - -
-
GSCP + CIS Total inc. Return of Contingencies 69,678 54,035 1,524 54,035 - 15,643
Page 84 of 340

Page 85

Midlothian Council 
23rd August 2022 
Financial Monitoring 2022/23 – General Fund Revenue 
Report by Gary Fairley, Chief Officer Corporate Solutions 
Report for Decision 
1 Recommendations 
Council is recommended to: 
a) Note the projected financial position for the General Fund Reserve in
financial year 2022/23 and the associated risks with projections at this
stage in the year; 
b) Approve a supplementary estimate of £1.395 million to cover
unbudgeted inflationary pressures; and 
c) Otherwise note the contents of the report. 
2 Purpose of Report / Executive Summary 
2.1 The purpose of this report is to provide Council with information on
projections of performance against service revenue budgets in 2022/23
and to provide commentary on areas of material variance against
budget. The projected budget performance figures as shown in
appendix 1 result in a net overspend of £0.225 million for the year
which is represents 0.08% of the revised budget.
2.2 With the assumption that Council will approve the supplementary
estimate for inflationary pressures the projected General Fund balance
at 31st March 2023 is £5.339 million, of which £1.336 million is
earmarked for specific use.
2.3 The projection of the General Fund Balance at 31st March 2023 is
predicated on the ongoing financial impact of the Covid-19 Pandemic
continuing to be met from the available funding, whether ring fenced for
specific purposes, or from general funding provided.   
Date:  11 August 2022
Report Contact:
Gary Fairley, Chief Officer Corporate Solutions
gary.fairley@midlothian.gov.uk   0131 271 3110 
Item 8.4
Page 85 of 340

Page 86

2 
3 Background 
3.1 This report encompasses all performance against revenue budget for
General Fund services including additional costs incurred and
projected lost income as a consequence of the Covid-19 pandemic. 
3.2 The main areas of projected service budget variances projected at
quarter 1 are outlined below. As ever, projections early in in a financial
year are difficult in many areas and come with a degree of risk. The
implications of economic conditions prevalent during 2022/23 only adds
to this this. 
Projected Overspends
• There remains £1.334 million of Medium Term Financial
Strategy (MTFS) cost reductions to be finalised mainly relating
to Management Reviews across Place (£0.753 million), Sport &
Leisure (£0.166 million), Corporate Solutions (£0.125 million)
and also including a review of the Council’s Creative Arts service
(£0.290 million). Clearly the pandemic has impacted on progress
with these but they are all are now at implementation stage.
These cost pressures are partly mitigated by vacancies of
£0.439 million held pending completion of reviews; 
• Council run cafes and the outside catering service have
reopened after a long period of closure. Business is
considerably slower than experienced pre-pandemic and may
not fully recover leading to a projected overspend of £0.238
million. Management are reviewing the offering;
• Insurance costs are projected to be over budget by £0.203
million due to provisions made for new or reopened claims on
the Council. Whilst no individual claim is of particularly high
value the volume of individual claims is higher than is
customary. Council officers and loss adjusters review each claim
with oversight by the Risk and Safety Group;
• Costs of transporting young people to education settings
exceeds budget by £0.139 million. A full review of school and
children’s services transport has been initiated; 
• Costs of vehicle repairs mainly relating to external works
exceeds budget by £0.134 million. A service review is underway
alongside immediate cost containment measures; 
• Customer income from the Trade Waste service is lower than
provided for in the budget. The customer base is contracting and
management are reviewing the implications of this. The
projected overspend is £0.129 million. 
These are partially offset by favourable movements against budget:
• Higher surplus cashflow and the current increasing interest rate
environment has provided opportunity to generate a higher of
return of £0.487 million on short term deposits than was
anticipated when the budget was set; 
Page 86 of 340

Page 87

3 
• The cost of residential and day education placements for
children is £0.445 million lower than budgeted. Investment in
local supports rather than utilising external placements is driving
this position but there remains a risk of expensive external
placements at short notice and out with the Council’s control;
• The cost of family placements for children is projected to
underspend by £0.195 million with a continued push to recruit
foster carers;
• Savings continue to accrue from the avoidance of use of Bed
and Breakfast accommodation for homeless clients. An
underspend of £0.213 million is projected.   
3.3 Relevant senior officers are required to deliver recovery actions at pace
for the service areas that are projecting overspends and accordingly it
is expected that pressure in these areas may reduce over the
remainder of the year once the impact of the recovery action is
validated.
Covid Costs
3.4 Covid related funding provided to the Council by the Scottish
Government alongside other funding streams aligned to Covid recovery
were carried forward from 2021/22 to 2022/23. Funding continues to be
applied in year to match costs and lost income with the planning
assumption that the remainder will be applied in 2022/23 or in future
years to mitigate the continued impact of the pandemic and support
increased service costs across Midlothian. 
Inflationary Pressures
3.5 Since the 2022/23 budget was approved there has been a rapid rise in
inflation. This has manifested itself in considerable additional and
unbudgeted costs in some service areas. Most visibly this is seen in
energy prices and contractual inflation embedded in contracts,
particularly for Public Private Partnerships (PPP). The latest
assessment of unbudgeted costs comes to £1.395 million and it is
recommended that Council fund this by way of a Supplementary
Estimate.  
Pay
3.6. The 2022/23 pay claims for all of the Local Government bargaining
groups have yet to be concluded. At its meeting on 17 June 2022
COSLA Leaders agreed to mandate the Resources spokesperson to
make a revised pay offer of 5% contingent on additional funding being
provided by the Scottish Government. Recognising the significant
affordability impact this will have for Councils it was agreed to continue
discussions to make clear to Scottish Ministers that they must urgently
identify and provide additional financial resource for Local Government
to protect local services and current staffing levels. 
3.7 Following a meeting on 3 August 2022 Mr John Swinney, Deputy First
Minister and Cabinet Secretary for Covid Recovery wrote to Councillor
Katie Hagmann, the COSLA Resources Spokesperson advising that 
Page 87 of 340

Page 88

4 
the Scottish Government was not in a position to provide the additional
3% funding (£277.5 million), as requested by COSLA Leaders but 
recognising  the challenge for councils as employers in funding a fair
and affordable pay offer for employees in the current climate advised
that the Scottish Government will make a contribution towards the
Local Government pay offer. 
3.8 The letter confirmed a Scottish Government financial contribution of
£140 million in 2022/23 to support a revised pay offer. This covered the
whole local government workforce, including teachers. Whist the letter
noted the importance of clarification around this being a recurring
contribution and whilst not providing confirmation at that time due to
continued uncertainty in the UK Government’s fiscal stance, it stated
that consideration of this will be a priority in the annual budget process.
Subsequently the Depute First Mister has confirmed that the £140
million will be recurring funding. 
3.9 Pay offers across all bargaining groups averaging 5% would result in
an unbudgeted cost estimated at £3.8 million when compared to the
2.5% provision made in the 2022/23 budget. Midlothian’s share of the
£140 million is estimated at £2.4 million and therefore a 5% offer would
represent a net unbudgeted cost of £1.4 million for 2022/23.   
3.10 At its special meeting on 5th August 2022 COSLA Leaders confirmed
that without additional, sustainable, funding from Scottish Government,
Local Government will be unable to make a significantly increased pay
offer to meet the trade union pay claims.  Leaders remitted to the
Resources Spokesperson to continue engagement with the Scottish
Government to seek full funding of the shortfall needed to construct a
baselined 5% offer and also remitted to the Finance Spokesperson to
continue engagement with both the Scottish and UK Governments and
to liaise with other local authority organisations to press for further
financial help from the Treasury. COSLA Leaders will reconvene on
12th August 2022 to further consider the matter and so a verbal update
will be provided to Council. 
3.11 At this point no adverse variation has been reflected in the outturn
projections for pay, if there is an unfunded element of any award at or
above 5% further consideration will need to be given as to how this is
funded within existing resources available to the Council.   
Building Maintenance Service
3.12 Financial outturn for 2021/22 reported to Council in June showed a
considerable adverse variance of £0.788 million for the Building
Maintenance Service. A subsequent discussion took place at Business
Transformation Steering Group at which clear direction was given to
officers to undertake a fundamental service review. Officers have
established a governance framework for this and a draft scope.
Meanwhile detailed work continues to address some of the
weaknesses previously identified.  
3.13 At this stage there is insufficient quality data, principally in respect of
service income, on which to base a meaningful financial projection. As
Page 88 of 340

Page 89

5 
a consequence there is a considerable risk, based on previous
experience, of an adverse variance against budget arising which would
add to the reported overspend and further deplete reserves. 
4 Delegation of resources to Midlothian Integration Joint Board
The approved budget provided for the allocation of £56.438 million to
the Midlothian Integration Joint Board (MIJB) for the provision of
delegated services. Minor technical adjustments to this allocation
during the year to date increase the allocation to £56.710 million.  
In accordance with the Integration Scheme the MIJB is required to
deliver delegated services within the budget allocations from the
Council and NHS Lothian and where any overspend is projected to put
in place a recovery plan to address that. As a last resort the integration
scheme allows for the MIJB to seek additional financial support from its
partners, either by way of an additional budget allocation or by
“brokerage” (provision of additional resources in a year which are
repaid in the following year).  
Additional costs incurred by the MIJB in response to the Covid-19
pandemic are expected to continue to be funded by government and
accordingly at this time the expectation is that delegated services will
be delivered within the allocations provided and so no provision has
been made for an additional budget allocation from the Council.
Financial Monitoring reports covering all of the MIJB activity are 
presented to the Integration Joint Board and are available on the
committee management section of the Council website:- 
Midlothian Integration Joint Board (cmis.uk.com) 
5 Projected General Fund Reserve 
The projected balance on the General Fund as at 31 March 2023 is as
follows: 
£ million £ million
General Fund Reserve at 1 April 2022   32.432   
Planned movements in reserves  
Application of Budgets carried forward from
2021/22 for use in 2022/23  (19.923) 
Funding of Corporate Solution for 2022/23 Budget (5.576) 
Supplementary Estimate for Inflationary Pressures  (1.395) 
Other movements 0.026 
(26.868)
Projected overspend per appendix 1  (0.225)
Projected General Fund Balance at 31 March
2023 
5.339 
Page 89 of 340

Page 90

6 
An element of the General Fund is earmarked for specific purposes and this
is shown below: 
£ million
Projected General Fund Balance at 31 March 2023 5.339
Earmarked for specific purposes 
To support Council Transformation (1.336)
Projected General Reserve at 31 March 2023 4.003 
The Reserves Strategy approved by Council on 12 February 2019 needs the
Council to maintain an adequate level of General Reserve to provide a
contingency for unforeseen or unplanned costs and that in the financial
context at that time approved the adoption of 2% of the approved budgeted
net expenditure (excluding resources delegated to the IJB) to be considered a
minimum. This now equates to £3.818 million. Council also agreed that where
projections indicate that should the 2% minimum General Reserve balance be
breached an immediate recovery plan be implemented to recover the
position, failing which, the next available budget would need to provide for the
reinstatement of reserve position. 
The projected General Reserve of £4.003 million is above the minimum set in
the Reserves Strategy but will only remain that way if there is no further
adverse performance against budget or any further draw on reserves. There
is also the continued uncertainty over the financial impact of the pandemic
and funding assumptions together with essential response costs relating to
weather conditions during the winter period. 
Similarly there is an expectation that there will be a recovery in the service
overspends projected at quarter 1. The impact of this recovery action will be
reflected in future projections when they are validated. 
6 Report Implications (Resource, Digital and Risk) 
6.1 Resource
The projected performance against budget set out in this report
presents the initial projections for the year. Work continues across the
council to reduce overspends and to progress at pace delivery of
approved savings. 
Whilst this report deals with financial issues there are no financial
implications arising directly from it. 
6.2 Digital 
Increased reliance and investment in digital solutions and digital first
solutions will be a key element of future plans. 
6.3 Risk
Section 95 of the Local Government (Scotland) Act 1973 requires all
Local Authorities in Scotland to have adequate systems and controls
in place to ensure the proper administration of their financial affairs. 
The assessment of performance against budgets by services is
Page 90 of 340

Page 91

7 
underpinned by comprehensive financial management and budgetary
control arrangements. These arrangements are central to the
mitigation of financial risk. 
Ensuring that adequate systems and controls are in place reduces the
risk of significant variances arising, and where they do arise they help
to ensure that they are identified and reported on and that appropriate
and robust remedial action is taken. The primary purpose of this report
is to provide an assessment of projected performance against budget
for the full year based on activity in the first quarter of the year. The
material variances detailed in the report highlight that the financial
management and budgetary control arrangements require continual
review and enhancement if financial risk is to be effectively mitigated
during the year. 
At this early point in the financial year there is a heightened risk that
actual costs and income level may vary across the remainder of the
financial year. The projected financial position could also deteriorate if
local or national restrictions were to be reintroduced. In additional the
risk of adverse weather has the potential to create pressure on service
budgets over the remainder of the year 
There are a some areas where effective forecasting of spend against
budget is hindered due to incomplete service information which in
previous years has resulted in previously unreported or significantly
adjusted variances at the financial year end. Financial Management
CMT continues to consider these areas and supports actions to
address the underlying issues and mitigate the risk associated with
them.   
The financial projections are predicated on new burdens, including
those arising from the Governments 100 day commitments to be fully
funded. The position with outstanding pay awards and the potential for
unfunded costs arising presents a significant risk to the Council’s
financial position not only for the current financial year but for future
years. 
The Council recognises the potential for compensation claims deriving
from Scottish Government’s Limitation (Childhood Abuse) (Scotland)
Act 2017 which removes the three year time limit on claims of child
abuse. Some claims will be historic and relate to Lothian Regional
Council, Midlothian District Council or their predecessors and some
will date post reorganisation and relate to Midlothian Council. And so 
presents a risk that would further reduce reserves from those currently
projected.  Further financial obligations may also arise as the
implications associate with the The United Nations Convention on the
Rights of the Child (Incorporation) (Scotland) Bill, which has yet to
secure Royal Assent , are more fully understood. 
6.4 Ensuring Equalities 
Page 91 of 340

Page 92

8 
As changes to existing plans are developed the assessment of the
impact of these proposals in relation to their impact on equalities and
human rights will be carried out. This will help to ensure wherever
possible that there are no negative impacts on equality groups or
potential for infringement of individuals’ human rights from the any of
the proposals. 
6.5 Additional Report Implications 
See Appendix A 
Appendices 
Page 92 of 340

Page 93

9 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
The exiting financial plans support the delivery of the key priorities in
the single Midlothian Plan. As the impact on the Council of the
pandemic and recovery continues to unfold over the financial year any
changes in the availability and allocation of resources will need to be
considered in parallel to the actions proposed to continue to delivery
key priorities. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value. 
A.5 Involving Communities and Other Stakeholders 
The development of the Medium Term Financial Strategy reflected a
community consultation exercise carried out in 2019 which has also
helped shape the drafting of the “Midlothian Promise” and the early
development of the Council’s Longer Term Financial Strategy.   
In addition there is continues engagement with the recognised Trade
Unions on the financial position. 
Page 93 of 340

Page 94

10 
A.6 Impact on Performance and Outcomes 
The Financial Strategy facilitates decision on how Council allocates
and uses its available resources and as such has fundamental
implications for service performance and outcomes. The financial
consequences of the pandemic will impact on the availability and
allocation of resources in pursuit of key outcomes as set out in the
Single Midlothian Plan for both the immediate and longer term and
therefore the ability of the Council to continue to deliver services in a
financial sustainable manner. 
A.7 Adopting a Preventative Approach 
Maintaining the effectiveness of the Financial Strategy will support the
prioritisation of resources to support prevention. 
A.8 Supporting Sustainable Development 
There are no direct sustainability issues arising from this report and we
will work to mitigate as far as feasible any sustainability issues which
arise as a consequence of any of the changes to existing plans. 
Appendix 1 financial tables 
Page 94 of 340

Page 95

MIDLOTHIAN COUNCIL
Appendix 1
GENERAL FUND 2022/23
Performance against budget
Revised Budget Revised Budget Revised Budget (Underspend)
Function Approved Budget Expenditure Income Net Outturn / Overspend
£ £ £
Management and Members 1,965,977 2,002,202 0 2,002,202 2,015,202 13,000
Place
Corporate Solutions 22,081,954 47,172,648 (24,528,180) 22,644,468 22,661,468 17,000
Place 35,963,912 51,601,420 (13,534,276) 38,067,144 38,889,144 822,000
Central Costs 1,860,593 5,144,072 5,144,072 5,347,072 203,000
People and Partnerships
Midlothian Integration Joint Board 56,437,641 65,231,665 (8,521,628) 56,710,037 56,710,037 0
Non-Delegated Services - Sport and Leisure, Community Safety and
Welfare Rights 1,995,738 7,479,717 (5,056,125) 2,423,592 2,574,592 151,000
Childrens Services, Partnerships and Communities 20,138,997 22,839,174 (438,567) 22,400,607 21,703,607 (697,000)
Education 108,920,147 136,062,857 (16,661,463) 119,401,394 119,604,394 203,000
Lothian Valuation Joint Board 581,659 581,659 0 581,659 581,659 0
Non Distributable Costs 898,936 898,936 0 898,936 898,936 0
GENERAL FUND SERVICES NET EXPENDITURE 250,845,553 339,014,350 (68,740,238) 270,274,111 270,986,111 712,000
Loan Charges 2,763,485 2,763,485 2,763,485 2,276,485 (487,000)
NDR Discretionary Relief 70,300 70,300 70,300 70,300 0
Investment Income (110,736) 0 (110,736) (110,736) (110,736) 0
Allocations to HRA, Capital Account etc. (5,331,603) (5,331,603) (5,331,603) (5,331,603) 0
248,237,000 336,516,532 (68,850,974) 267,665,557 267,890,557 225,000
less Funding:
Scottish Government Grant (184,165,000) 0 (184,583,500) 184,583,500 184,583,500 0
Council Tax (58,496,000) 0 (58,496,000) 58,496,000 58,496,000 0
Utilisation of Reserves 5,576,000 336,516,532 (311,930,474) 24,586,057 24,811,057 225,000
Item 8.4
Page 95 of 340

Page 96

Page 96 of 340

Page 97

Midlothian Council 
23 August 2022 
Medium Term Financial Strategy – 2023/24 to 2027/28 
Report by Gary Fairley, Chief Officer Corporate Solutions 
Report for Noting 
1 Recommendations 
Council is asked to note:-
a) The proposed reporting schedule to support finalisation of the budget
and Council Tax levels for 2023/24;
b) The update on Scottish Government grant prospects which reflects the
Scottish Government’s Resource Spending Review (RSR) published
on 31 May 2022. Noting also that the RSR sets out extremely
challenging  planning parameters for Local Government which are
exacerbated for Midlothian by the financial pressures associated with
population growth;
c) The update on the position with 2022/23 pay claims and the associated
impact for the period of the Medium Term Financial Strategy. 
d) The update in respect of fiscal flexibilities and that having now received
draft statutory guidance that work continues to assess the full
implications of the service concession flexibility; 
e) That the underlying budget gap for 2022/23 is now projected to be  
£13.130 million and that as a consequence of both the inflationary
increase in costs and cash flat grant settlements the projected budget
gap for 2023/24 now stands at £14.4 million rising to a projected £27.1
million by 2027/28;
f) Otherwise note the remainder of the report. 
Item 8.5
Page 97 of 340

Page 98

2 
2 Medium Term Financial Strategy 2023/24 to 2027/28 - Background 
Council last considered an update on its Medium Term Financial
Strategy on 15 February 2022 where it agreed the following: 
a) Note that at its meetings of 24 and 31 January and 2 February 2022
the Business Transformation Steering Group gave consideration to
recommendations to Council to enable Council to fulfil its statutory
duty, as set out in Section 93 of the Local Government Finance Act
1992 (as amended), namely to set Council Tax and a Balanced
Budget for 2022/23;
b) Consider the recommendations from the Business Transformation
Steering Group meeting on 2 February 2022 that Council approves:- 
• The deferment of debt repayments in 2021/22 & 2022/23 to
secure £6.358 million to support the 2022/23 budget;
• The utilisation of £2 million from uncommitted earmarked
reserves to support the 2022/23 budget ;
• An allocation of £56.438 million to the Midlothian Integration
Joint Board for 2022/23 in respect of delegated services
(subject to final confirmation of the quantum and distribution
of funding for new burdens);
c) Note that after incorporating the measures in recommendation b)
that the remaining budget gap for 2022/23 would be £1.369 million;
d) Approve a one off addition of £0.250 million to the 2022/23 budget
to supplement the Scottish Welfare Fund;
e) Approve the 2022/23 service budgets as set out in Appendix D (as
revised) which includes the application of £0.250 million from the
projected general reserve;
f) Note the amended analysis of change as set out in Appendix E (as
revised);
g) As a consequence set a Band D Council Tax for 2022/23 of
£1,442.60 as set out in appendix F; 
h) Note that the projected general reserve remains £1.403 million 
above the minimum level determined by reference to the Council’s
Reserve Strategy;
i) Otherwise note the update in respect of Scottish Government grant,
individual Council grant settlements and the net cost of services as
set out in the report;
j) Delegate authority to the Chief Officer Corporate Solutions to
determine if it is preferential to use the fiscal flexibility of a Loan
Repayment Holiday in 2022/23 should the Statutory Instrument
route be adopted by Scottish Government. In such circumstances
the use of the Loans Fund review would be utilised in 2021/22 to
create reserves to utilise to support the 2022/23 budget as part of
the options noted in recommendation b);
k) In considering the recommendations above in respect of the
2022/23 budget also consider the overarching EQIA published
alongside this report. 
Page 98 of 340

Page 99

3 
Council will recollect that a corporate solution, principally the use of one
off funding measures, was developed to support the setting of a
balanced budget 2022/23. The final budget set during the last term of
Council. 
Accordingly, this report provides Council with an update on the
development of the Medium Term Financial Strategy (MTFS) covering
the budgets to be determined during this term of Council for financial
years 2023/24 through to 2027/28. It includes an update on Scottish
Government grant prospects, the wider economic and political factors,
update on key assumptions and the current assessment of budget
gaps. That being the extent to which recurring net expenditure is
projected to exceed income from Scottish Government Grant and
Council Tax income based on the current Band D Council Tax of
£1,442.60.   
The projections in this report, being based on planning assumptions,
will undoubtedly change as wider economic factors change and as
Scottish Government publishes its budget for each year. Indeed since
preparing the projections for this report the latest Bank of England
Monetary Policy report published on 4th August 2022 points to high
levels of inflation continuing through 2023 which, in the absence of any
additional Scottish Government grant support, would have the effect of
increasing the projected budget gaps.   
The aim of the Medium Term Financial Strategy is to provide a
multiyear strategy aligned to the development and approval of the
Midlothian Council Strategic Plan 2022-2027, A great, green place to
grow: where people and the environment flourish. It seeks to support
the Council in fulfilling its statutory duty to set a balanced budget and
determine Council Tax levels annually.  In that respect, the final budget
for 2023/24 will be updated to reflect the actual position for Scottish
Government grant and Council Tax policy once the Scottish
Government’s budget bill and the associated finance circular are
published late in 2022. As updates are brought to Council a
reassessment of pay and inflation provisions will be made taking
cognisance of the Scottish Government Public Sector pay policy and
the extent to which this is reflected in the grant settlement. 
3 Budget Projections 
At its meeting on 13 June 2022, The Business Transformation
Steering Group was provided with an overview of the initial budget
projections for financial years 2023/24 to 2027/28. These projections
were based on key assumptions on pay inflation, government grant
and Council Tax and included and reflected an initial assessment of
the Scottish Government’s Resource Spending Review published on
31 May 2022. 
The budget projections were again updated in late July to reflect the
latest assessment at that time for pay and other contractual inflation
Page 99 of 340

Page 100

4 
together with grant prospects based on the Scottish Government’s
Revenue Spending Review planning parameters. The resultant
updated projected budget gaps for each of the years is set out later in
the report. In respect of the impact inflation and pay pressures is
having on the current financial year, the Financial Monitoring General
Fund report also on today’s agenda sets on the projected in year
impact and the resultant call on reserves as a consequence of
inflation pressures in respect of energy, fuel and contractual inflation
linked to CPI/RPI which have crystalised since the budget for 2022/23
was agreed on 15 February 2022. 
In the lead up to concluding the necessary budget decisions in respect
of financial year 2023/34 the following reports are anticipated:- 
BTSG Council Objective of Report 
5
September
4 
October
A report for Decision- 
• Presentation of proposed strategic plan. 
• Update on MTFS and updated projections.
• Measures to secure financial balance. 
• Consultation and engagement arrangements
for the strategic plan, MTFS and associated
savings measures.
17 
October 
15
November
A report for Noting
• Update including revisions to budget
projections and underlying gap.
28
November
13
December
A report for Decision 
• Post consultation/engagement report on
Strategic Plan.
• Updated budget projections and revisions to
measures required to secure a balanced
budget for 2023/24.
• Consideration and decision on Business
Transformation Steering Group
recommendation in respect of budget savings
measures. 
TBA TBA
February
A report for Decision - Finalisation of 2023/24
budget 
• Determine Council Tax for 2023/24 taking
cognisance of settlement conditions. 
• Any changes as a consequence of the grant
settlement required to agree a balanced
budget for 2023/24.
.  
Page 100 of 340

Page 101

5 
4 Scottish Government Grant Settlement 
On 31 May 2022 Ms Kate Forbes, The Cabinet Secretary for Finance
and Economy set out the Scottish Government’s Resource Spending
Review (RSR).  The Scottish Government's first resource spending
review since 2011, sets out the high-level parameters for resource
spend within future Scottish Budgets up to 2026/27 and is described
as providing a long-term plan focused on the outcomes, to deliver the
Programme for Government and Bute House commitments. It offers a
strategic funding framework for the Scottish Government and partners
to plan for the future. 
The RSR outlines how the Scottish Government will focus public
finances in the coming years to tackle child poverty, address the
climate crisis, strengthen the public sector as Scotland recovers from
Covid and grow a stronger, fairer and greener economy. 
The RSR and in turn the Council’s own Medium Term Financial
Strategy are being prepared against a back drop of inflation at a 40-
year high of over 9 per cent, meaning households and businesses are
under significant pressure, while still recovering from the shock of the
COVID-19 pandemic. Bottlenecks in supply chains are proving more
persistent than originally feared, including due to continued COVID-19
restrictions in China. The Russian invasion of Ukraine and the
increases in global commodity and energy prices are continuing to
exacerbate significant cost pressures across the economy, adding to
the underlying impacts of EU Exit, which have meant that the UK has
one of the highest rates of inflation in the G7.   
The RSR highlights that Scottish Government face significant volatility
in its funding outlook. It notes that the funding available to the Scottish
Government can vary substantially over time as economic forecasts
change and as the UK Government revises its spending plans. The
difference in timing between the UK Spending Review, Office of
Budget Responsibility forecasts and Scottish Fiscal Commission
forecasts, which form the basis of the Scottish Government’s funding
envelope, has contributed to the uncertainty and as such the Scottish
Government is extremely constrained through the fiscal framework, a
legislative requirement to balance the budget, and by limitations on its
ability to borrow or increase tax revenue to fund additional resource
spending to manage these fluctuations. 
Against this backdrop the RSR states that, “The Scottish Government
is fully deploying the levers we have under the framework, however, it
is increasingly clear that they are insufficient to manage the
challenges we face”. The RSR presents further specific investment to
by the Scottish Government including: 
• Delivering the commitment to increased year on year funding for
the National Health Service investing £73 billion over the period of
the RSR, with 50 per cent of that invested in community health
services.
Page 101 of 340

Page 102

6 
• Investing in social care and integration over the spending review
period laying the groundwork for the National Care Service,
bringing social care into parity of esteem with healthcare and
transforming the provision of this essential service.
• More than doubling the value of the Scottish Child Payment (SCP)
to £25 per week per child and rolling out the SCP in full to children
under 16, by the end of 2022 and maintaining this over the
spending review period.
• Implementing measures which reduce the cost of the school day,
including expanding free school meal provision and working to
build a system of school age childcare that is free to those on the
lowest incomes.
• Funding to recruit 3,500 additional teachers and 500 support staff.
• Continuing to deliver the Scottish Attainment Fund, to tackle the
poverty related attainment gap.
• Addressing backlogs in the justice system, supporting victims of
crime and continuing to reduce reoffending.
• Supporting all parts of government to deliver the National Strategy
for Economic Transformation.
• Delivering on the employability offer to parents by spending £670
million over the review period to help reduce child poverty –
supporting thousands of parents into work, and parents already in
work to increase their earnings.
• Spending £160 million over the spending review period on digital
transformation to deliver better outcomes - bringing 300,000
households online through the Connecting Scotland programme
and enabling access to gigabit and superfast broadband.
• £95 million of further investment across the review period to
support increasing levels of woodland creation.
• Resource funding to support capital investment in low carbon
infrastructure and affordable housing over the period of the Capital
Spending Review including £1.8 billion to make homes and
buildings warmer and an increase in active travel spending to a
combined resource and capital total of £320 million a year over the
period. 
In respect of Local Government alongside the RSR Ms Forbes wrote
to the then COSLA President, Councillor Alison Evison. Ms Forbe’s
letter (which was copied to all Council Leaders and which is attached
as Appendix B) states that “Reflecting the fact that Local Authorities
are key partners in the delivery of the priorities set out by the spending
review, the spending review baselines the £120 million added during
the 2022/23 Budget Bill process and maintains General Revenue
Grant, Non-Domestic Rates Income and Specific Resource Grants
between 2023/24 and 2025/26 before adding a further £100 million in
2026/27”. 
In a report to COSLA Leaders at their special meeting on 17th June
2022, COSLA Officials set out the implications for Local Government
of the RSR.  That report highlights that the RSR shows a “flat-lining” of
revenue funding for Local Government at 2022/23 levels for the next 3
financial years (this includes a baselining of the £120m added during
Page 102 of 340

Page 103

7 
the Budget Bill) and then sees an additional £100m added in 2026/27. 
This guarantees £10,612m for the next 3 years, rising to £10,712m in
2026/27. This guaranteed funding comprises General Revenue Grant
(including specific grants) plus Non-domestic Rates (NDR) income. 
However, the total revenue settlement for 2022/23 was £12,000m
because an additional £1,384m was transferred in from other
portfolios, for specific purposes. 
The Cabinet Secretary’s letter specifies that existing transfers
including for Health and Social Care, and additional teachers
(c£1,000m) will be maintained, however, final details of the remaining
transfers (c£345m) will not be taken until the budget in December
2022. 
Commentators on the RSR have recognised the impact on Local
Government, with both SPICe and Fraser of Allander stating that the
proposals essentially represent a 7% real terms decrease in funding
between 2022/23 and 2026/27. This is in contrast to the 4.7% real
terms increase that the Scottish Government will see overall (2% if
social security transfers are excluded), and the real terms increases
that Health, Social Justice and Housing will see. 
The COSLA Leaders report highlights that the real term decrease
planned for Local Government comes on top of significant real term
reductions since 2013/14, which has driven ongoing reform,
rationalisation, innovation and transformation work across Local
Government – across workforce, property, digital, and procurement. It
notes that these are now areas that the rest of the public sector is
being asked to tackle as part of the RSR, with local authorities being
“invited to adopt a complementary approach”. 
In relation to public sector pay, the RSR has set the tone by stating a
commitment to fair work, but to returning the workforce to pre-
pandemic levels, targeting workforce growth in priority areas but
holding the overall pay bill – as opposed to pay levels – at 2022/23
levels. Put simply, this means less but better paid jobs in the public
sector. 
The RSR states that Local Government is responsible for making
decisions about pay, but the flat cash settlement prospects implies
that a similar approach will be necessary. This will be particularly
challenging, as well as risking distorted effects in some parts of the
workforce dependent on commitments relating to workforce (e.g. the
Pupil Teacher Ratio) and increasing demand in some areas (e.g.
social care due to demographics). 
In summary, the RSR presents Local Government with the prospect of
cash flat grant settlements through to 2025/26 with a small increase of
£100m for 2026/27. This represents extremely challenging planning
parameters for Local Government which are exacerbated for
Midlothian by the financial pressures associated with population
Page 103 of 340

Page 104

8 
growth. Unfortunately, these planning parameters are broadly in line
with the Council’s previous planning assumption. 
As members will be aware on 21st June 2022, Scottish Government
published the National Care Service (Scotland) Bill. If established, the
National Care Service would allow Scottish Ministers to transfer social
care responsibility from local authorities to a new, national service.
This could include adult and children’s services, as well as areas such
as justice social work. Scottish Ministers will also be able to transfer
healthcare functions from the NHS to the National Care Service.
Scottish Government’s intention is to have the new National Care
Service established by the end of this Parliament. 
The establishment of a National Care Service and Care Boards and
transfer of social care responsibilities from Local Government will
have a fundamental impact on future Council budgets recognising that
such a transfer could encompass circa 30% of the Council’s current
net expenditure. 
5  2022/23 Pay Claims and Future Years Pay Inflation 
The 2022/23 pay claims for all of the Local Government bargaining
groups have yet to be concluded. At its meeting on 17 June 2022,
COSLA Leaders agreed to mandate the Resources Spokesperson to
make a revised pay offer of 5% contingent on additional funding being
provided by the Scottish Government. The amendment noted that this
would match that offered to Agenda for Change NHS staff. Recognising
the significant affordability impact this will have for Councils COSLA
Leaders agreed to continue discussions to make clear to Scottish
Ministers that they must urgently identify and provide additional
financial resource for Local Government to protect local services and
current staffing levels. 
Following a meeting on 3 August 2022, Mr John Swinney, Deputy First
Minister and Cabinet Secretary for Covid Recovery wrote to Councillor
Katie Hagmann, the COSLA Resources Spokesperson. The letter
advises that the Scottish Government is not in a position to provide the
additional 3% funding (£277.5m), as requested by COSLA Leaders but 
recognising the challenge for Councils as employers in funding a fair
and affordable pay offer for employees in the current climate advised
that the Scottish Government will make a contribution towards the
Local Government pay offer. 
The letter confirm a Scottish Government financial contribution of £140
million in 2022/23 to support a revised pay offer and confirmed that this
covered the whole local government workforce, including teachers. The
letter also noted the importance of clarification around this being a
recurring contribution  and whilst not providing confirmation at that time
due to continued uncertainty in the UK Government’s fiscal stance it
stated that consideration of this will be a priority in the annual budget
Page 104 of 340

Page 105

9 
process. Subsequently, the Depute First Minster has confirmed that the
£140 million will be recurring funding. 
Pay offers across all bargaining groups averaging 5% would result in
an unbudgeted cost estimated at £3.8 million when compared to the
2.5% provision made in the 2022/23 budget. Midlothian’s share of the
£140 million is estimated at £2.4 million and therefore a 5% offer would
represent a net unbudgeted cost of £1.4 million for 2022/23.   
At its special meeting on 5th August 2022, COSLA Leaders confirmed
that without additional, sustainable, funding from Scottish Government,
Local Government will be unable to make a significantly increased pay
offer to meet the trade union pay claims. Leaders remitted to the
Resources Spokesperson to continue engagement with the Scottish
Government to seek full funding of the shortfall needed to construct a
baselined 5% offer and also remitted to the Finance Spokesperson to
continue engagement with both the Scottish and UK Governments and
to liaise with other local authority organisations to press for further
financial help from the Treasury. COSLA Leaders will reconvene of 12
August to further consider the matter and so a verbal update will be
provided to Council. 
For planning purposes the projection in this report reflect a 5% offer for
2022/23 together with Council’s share of the recurring £140 million
contribution from Scottish Government. The effect of this would be to
increase the underlying budget gap for 2022/23 and so the opening
budget gap for 2023/24 by £1.4 million. 
The Scottish Joint Council bargaining group Trade Unions have
balloted member for industrial action targeted at waste, early years and
schools. The Trade Unions mandates for industrial action represent a
very mixed position across the country. In respect of Midlothian, the
ballot has secured a mandate for action by GMB members in waste
services only.  At the time of writing, no notification of actual action has
been received and so again a verbal update will be provided at the
meeting on the position in respect of any action by GMB members. 
As stated earlier the RSR approach to pay pressures is to return the
public sector workforce to pre-pandemic levels, targeting workforce
growth in priority areas but holding the overall pay bill – as opposed to
pay levels – at 2022/23 levels. The feasibility of this for Local
Government is questionable. Between 2006 and 2018, there was a
steady reduction in Local Government workforce due to significant
efficiency savings and service transformation programmes resulting in
the workforce reducing by circa 15% from 2006 levels. Significant
Scottish Government policy direction since 2018 and the need to
respond to COVID has meant staff increases to the extent that if
staffing for additional commitments is removed, the Local Government
staffing levels would be back at 2018 levels. 
Page 105 of 340

Page 106

10 
This is in contrast to trends in other parts of the public sector which
have seen Scottish Government nearly double since 2006, Scottish
Government agencies grow by 15% and NDPBS more than double. 
6 Update on Fiscal Flexibilities 
As Council is aware COSLA and Scottish Government reached
agreement on three financial flexibilities in respect of a Loans Fund
Repayment Holiday, Capital Receipts and Service Contract
Concessions.  The former two flexibilities were adopted as part of the
Corporate Solution, principally on of funding measures, to balance the
2022/23 budget and support business transformation. 
In her letter to the COSLA President on 31 May 2022, Ms Forbes
confirms the Scottish Government’s intention to commission an
independent Capital Accounting Review. The independent review will
build on the review already taken forward by Directors of Finance
working with key stakeholders to deliver a phased approach towards
alignment with the CIPFA Code of Practice for Local Authority
Accounting. 
In terms of the fiscal flexibility sought for Service Contract Concessions
(PPP/PFI etc. contracts) the Government have acceded to the request
to recognise principal debt repayments over the asset life and for this
approach to be applied retrospectively. This can also apply to the grant
funded element of the principal debt repayments.  The government
requires that each local authority will be responsible for fully evaluating
any change in method and making appropriate financial provision. The
decision for making any change must be taken by the Council and may
not be delegated. 
Subsequently, draft statutory guidance has been received and work is
underway to fully evaluate any change in the accounting treatment and
associated financial provisions. This will support a determination of the
prudent application of the guidance and the assessment of the impact
of the flexibility on the Medium Term Financial Strategy. At the present
time, the projections set out in this report assume an in year adjustment
from the application of the flexibility with further work focussing on the
prudence of any application retrospectively.  This assessment may be
hampered or delayed until the scope and potential impact of the Capital
Accounting Review is better understood given both impact on the
requirement to ensure that there is a prudent provision for the
repayment debt associated with capital investment. 
7  Projected Net Cost of Services 
The current year’s budget, 2022/23, approved on 15 February 2022
was reliant on £12m on one off funding measures. Since that time
changes relating to pay, government grant and inflation have resulted
in this figure now projected to be £13.130 million as detailed in the
Page 106 of 340

Page 107

11 
table below. 
The projections for future years in this report are predicated key
assumptions in respect of Scottish Government Grant, pay and other
inflation and Council Tax growth.  The projections are also predicated
on the current structure of public services in Scotland, as such no
adjustment has been made for the implementation of a National Care
service or any other changes in the structure of Local Government. As
the National Care Service (Scotland) Bill progress through Parliament
and toward implementation, it will be necessary to assess the impact
on future year’s budgets. 
In respect of Scottish Government Grant, the national planning
parameters for this have been defined by the RSR with cash flat
settlements for 2023/24 to 2025/26 and a £100m increase for
2026/27. As the Medium Term Financial Strategy extends to 2027/28
it has been assumed that there will be a further £100m increase for
that year. 
In respect of pay and other inflation economic commentators the
assessment at the time the budget projections were reviewed in late
July were that inflation should fall as food and energy pressures ease
(only have to remain flat for inflation to fall fast), though there is a risk
that high wage settlements will begin a wage inflation cycle. Looking
further ahead concerns could be over high inflation if world issues
worsen and/or wages rise fast or in contrast, if more of a return to
normal, then deflation worries could return, as demand remains low
versus supply. 
As such for the period of the Medium Term Financial Strategy the
projections were updated to reflect the current inflationary pressures
but with the in-year inflation assumption remaining at 2.5%. The Bank
of England August Monetary Policy report would suggest that high
inflation may continue through 2023 and so the next reassessment of
Page 107 of 340

Page 108

12 
budget projections is anticipated to see budget gaps increasing as the
contractual inflation provisions and energy budgets are increased. 
In a change to presentation from previous budget projections and the
last Medium Term Financial Strategy, no increase in Band D Council
Tax has been included in the projection. The only change to Council
Tax income being the projected growth in properties. This approach
better recognises that decisions to increase Council Tax are better
positioned as part of the response to the financial challenge and also
the legislative position where Council Tax levels and the resultant
Council Tax income needs to be sufficient to fund the balance of
expenditure not otherwise funded from government grant, fees,
reserves etc.   
Work will continue to review and update cost projections based on the
latest information available. As such, the analysis of change set out
below is provisional and will change over the term of the Medium Term
Financial Strategy. The aim is to focus on 2023/24 with the objective of
de risking, as far as possible, the deliverability of the 2023/24 budget
and allow pre settlement updated projections to be included in the
report scheduled for 14 December 2022.   
Financial Outlook 2023/24 to 2027/28  - Analysis of Change   
2023/24 2024/25 2025/26 2026/27 2027/28
£m £m £m £m £m
Opening Gap for the Year 13.130 14.391 18.241 22.215 24.616
Budget Changes
Staffing - Pay Inflation and salary progression 3.881 3.977 4.077 4.179 4.283
Contractual Inflation & Indexation 1.072 1.099 1.126 1.154 1.183
Loan Charges 0.568 0.250 0.250 0.250 0.250
Service Concession - in year adjustment -2.336 0.000 0.000 0.000 0.000
Other -0.011 -0.011 -0.011 -0.011 -0.012
Gross Expenditure Increases 3.174 5.315 5.442 5.572 5.704
Reinstate Lothain Buses Dividend -0.450 0.000 0.000 0.000 0.000
Council Tax - Property Growth -1.350 -1.350 -1.350 -1.350 -1.350
Scottish Government Grant -0.113 -0.115 -0.118 -1.821 -1.824
Gross Income Increases -1.913 -1.465 -1.468 -3.171 -3.174
Budget Gap to Address 14.391 18.241 22.215 24.616 27.146 
Members will note that there is no provision made in the table above for
demographic pressures. As this stage, rather than including a broad
estimate, further work is being undertaken to more fully understand the
probable demographic pressures across Schools, ASN and Children’s
Services and also how the impact will flow through the grant distribution
system. In the short term, pressures would be mitigated by one of
funding sources.   
The tables highlight that the underlying budget gap for 2022/23 is
£13.130 million. That is the extent to which the recurring expenditure in
the current year’s budget is funded by non-recurring funding sources. 
As a consequence of the inflationary increase in costs and cash flat
grant settlements the projected budget gap for 2023/24 now stands at
£14.4 million rising to a projected £27.1 million by 2027/28, albeit later
years are based on the existing service responsibilities with no
adjustment for the consequences of the National Care Service
Page 108 of 340

Page 109

13 
(Scotland) bill. These budget gaps represents the extent to which
recurring service expenditure is projected to exceed recurring income. 
By progressing the Medium Term Financial Strategy as an integral part
of the Strategic Plan, it will support members in taking early decisions
to address the projected budget gaps. Thereafter, when Council meets
in February each year to finalise the budget and set Council Tax for the
year ahead members will only have to consider recommendations from
the Business Transformation Steering Group in respect of any matters
arising from the settlement. 
8 Medium Term Financial Strategy Savings Measures 
Alongside development of the Strategic Plan and in cognisance of the
projected budget gap for 2023/24 and beyond, the Corporate
Management Team are developing those measures that would be
necessary to contribute to reducing the projected budget gaps. 
While these include service transformation options, the severity of the
financial outlook, in part driven by the challenging planning parameters
indicated by the Scottish Governments RSR,  is such that it will be
necessary to develop measures that have a wide ranging impact on
services and which see cuts in services that communities have until
now enjoyed and relied upon.   
These measures will undoubtedly be unwelcomed by elected
members, communities and staff but in the absence of any
fundamental change in the planning parameters which flow from the
Scottish Government’s RSR or a very significant increase in Council
Tax, they are the types of measures that will be necessary to
implement to enable elected members to fulfil their statutory duty to set
a balanced budget for each year. 
Reflecting the extent of the challenge and the wide raging implications
for service provision associated with savings measures officer and
member engagement has continued over the summer with a view to
presenting these alongside the draft strategic plan to the Council
meeting in October 2022. 
In addition to savings measures, members should note that each 1% or
£14.42 per annum increase in Band D Council Tax would generate
circa £580,000 per annum in additional income. 
9  Next Steps 
9.1 Engagement on the Medium Term Financial Strategy 
As the proposed strategic plan and savings measures necessary to
secure financial balance are concluded, both will be set out for public
Page 109 of 340

Page 110

14 
engagement with the outcome reported back to Council before any
decisions are take.   
9.2  Finalisation of the 2023/4 Budget and Setting Council Tax 
The scheduled meetings of the Business Transformation Steering
Group and Council would support the approval of the Strategic Plan
and associated Medium Term Financial Strategy in December 2022
and for the decisions required in respect of the finalisation of the
2023/24 budget at Council in February 2023. 
9.3 Midlothian Integration Joint Board 
The Chief Officer and Chief Financial Officer of the Midlothian
Integrated Joint Board (IJB) are being kept updated on the Council’s
budget position and are engaged in the development of the Medium
Term Financial Strategy. 
The indicative budget to be delegated to the IJB for 2023/24 together
with future years, indicative allocations are being developed on the
basis of the minimum requirements set out by Scottish Government for
2022/23 continuing. That being, the 2023/24 budget should be no less
than the 2022/23 recurring budget plus the IJB’s share of new monies
provided in 2023/24. However, it will only be possible to formulate a
formal offers for the IJB once the annual grant settlement is available
and the quantum of any additional monies for delegated activities and
any conditions attached to the settlement are known.   
Business Transformation Steering Group will be asked to consider the
formal offer arising from the settlement when it meets in January 2023
and this will form part of the final budget recommendations to Council. 
9.4 Governance and Timetable 
Each element of the Medium Term Financial Strategy continues to
have governance in place to support the timely delivery of the work
streams. Any changes will first be reported to Business Transformation
Steering Group with recommendations then presented to Council.   
Responsibility for setting Council Tax and determining budgets remains
with Council.   
Council has a duty as set out in Section 93 of the Local Government
Finance Act 1992 (as amended) to set its Council Tax and a balanced
budget for the following financial year commencing 1 April by 11 March.   
Members should note that the legislation contains no specific
requirement for a Council to set its budget at the same time as setting
its Council Tax. This is because it is implicit in setting the Council Tax
that Council Tax income needs to be sufficient to fund the balance of
Page 110 of 340

Page 111

15 
expenditure not otherwise funded from government grant, fees,
reserves etc.   
As Council Tax funds the gap between expected income and
expenditure, you need to first identify your proposed expenditure to
determine the resulting gap that Council Tax needs to fund. If no other
action is taken to redress any shortfall, then the Council Tax has to be
set at a rate that will do so, otherwise the budget will not balance.
Accordingly, Council Tax decisions cannot be taken in advance of other
budget decisions.   
Members should also continue to note that in terms of Section 112 of
the Local Government Finance Act 1992 (as amended) it is an offence
for members to participate in any vote in respect of setting Council Tax
where the member has unpaid Council Tax.  Accordingly at the Council
meeting where these decisions are formally taken members would be
required to disclose the fact if this section of the act applies to them
and subsequently not vote on any question with respect to the matter. 
10 Report Implications (Resource, Digital and Risk) 
10.1 Resource
Whilst this report deals with financial issues there are no financial
implications arising directly from it.  
10.2 Digital 
The adoption of digital solutions is a central strand of the Medium Term
Financial Strategy. 
10.3 Risk
Within any financial projections, there are a number of inherent
assumptions in arriving at figures and budget provisions and therefore
risks that may be faced if costs change or new pressures emerge.   
The following key risks and issues are highlighted in the context of this
report: 
• Uncertainly over the Scottish Government’s and Council’s financial
position;
• The economic outlook and decision by Scottish Government on
future years grant settlements and grant distribution;
• The risk to service provision and service users associated with a
continued decline in available resources to fund services;
• Future years Public Sector pay Policy and current and future year
pay award settlements;
• Actual school rolls varying from those provided for in the budget;
• The impact of the wider economic climate on range of factors
including: inflation, interest rates, employment, tax and income
levels and service demands;
• Cost pressures, particularly demographic demand, exceeding
budget estimates; 
Page 111 of 340

Page 112

16 
• The reform of public services and the implications for the National
Care Service (Scotland) Bill;
• The impact of Universal Credit, and potential pension changes;
• The costs of implementation of national policies varying from the
resources provided by Government; 
• Potential liabilities arising from historic child abuse;
• Unplanned capital investment requirements and the associated
cost; and
• Ability to continue to meet the expectations of our communities
within a period of fiscal constraint. 
The Medium Term Financial Strategy aims to mitigate a number of
these risks by setting out the key assumptions on which forward plans
are based. The consequences of the challenging grant settlement
parameters mean that it is also necessary to bring forward measures to
secure financial balance over the period covered by the Medium Term
Financial Strategy. 
The risk of not having in place a balanced Medium Term Financial
Strategy is the potential elimination of available reserves, which in turn
would severely limit the Council’s ability to deal with unforeseen or
unplanned events and also the imposition of significant cuts at short
notice with limited opportunity for consultation. Early agreement of the
Medium Term Financial Strategy alongside the Strategic Plan will help
to prioritise available resources and so support Councillors to fulfil their
statutory duties in respect of setting budgets and determining Council
Tax levels.   
10.4 Ensuring Equalities 
The Medium Term Financial Strategy and the resource allocation
measures which will support financial sustainability will, as far as the
constraint on resources allow, be developed within the context of the
Strategic Plan, ensuring as far as possible that resources are directed
towards the key priorities of reducing inequalities in learning, health
and economic circumstance outcomes. 
The Medium Term Financial Strategy will continue, as far as is
possible, to reflect Midlothian Council’s commitment to the ethos of the
Equality Act 2010 with careful consideration of the interests of the most
vulnerable in our communities through the preparation of equality
impact assessments. 
In addition, the Strategic Plan will underline the Council’s commitment
in its Equality Plan to tackle inequality and promote inclusion within the
limitations of the resources available. It will also allow the Council to
plan and deliver services which meet the needs of our diverse
communities and respond to the changes ahead. 
An overarching EQIA will be published alongside the strategic plan on
the Committee Management section of the Council’s website and this
Page 112 of 340

Page 113

17 
will be updated in parallel to the Medium Term Financial Strategy report
presented to the Council meeting in February 2023. 
10.5 Additional Report Implications 
See Appendix A 
Appendices
APPENDIX A – Report Implications
APPENDIX B – Cabinet Secretaries’ letter 
Page 113 of 340

Page 114

18 
A.1 Key Priorities within the Single Midlothian Plan
The Medium Term Financial Strategy facilitates decision on how
Council allocates and uses its available resources and as such has
fundamental implications for delivery of the key priorities in the Single
Midlothian Plan. It helps ensure that resources are available to
continue to delivery key priorities. 
A.2 Key Drivers for Change
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value
The report does not directly impact on delivering Best Value. 
A.5 Involving Communities and Other Stakeholders
The development of the Strategic Plan and associated Medium Term
Financial Strategy will include a public engagement phase later in the
year. 
In addition, there has been and will continue to be, engagement with
the recognised Trade Unions on the Council’s financial position and the
development of the Strategic Plan and associated Medium Term
Financial Strategy. 
A.6 Impact on Performance and Outcomes
The Medium Term Financial Strategy facilitates decision on how the
Council allocates and uses its available resources and as such has
fundamental implications for service performance and outcomes. The
financial consequences of the pandemic have impacted on the
availability and allocation of resources in pursuit of key outcomes as
set out in the Single Midlothian Plan for both the immediate and longer
term and therefore the ability of the Council to continue to deliver
services in a financial sustainable manner.
Page 114 of 340

Page 115

19 
A.7 Adopting a Preventative Approach
An effective Medium Term Financial Strategy will support the
prioritisation of resources to support prevention. 
A.8 Supporting Sustainable Development
There are no direct sustainability issues arising from this report and we
will work to mitigate any sustainability issues which arise as a
consequence of the Medium Term Financial Strategy. 
Page 115 of 340

Page 116

20 
Appendix B 
Page 116 of 340

Page 117

21 
Page 117 of 340

Page 118

22 
Page 118 of 340

Page 119

23 
Page 119 of 340

Page 120

24 
Page 120 of 340

Page 121

Midlothian Council 
23th August 2022 
Scottish Parliament  Finance and Public Administration Committee - Pre-
Budget Scrutiny Call for Views 
Report by Gary Fairley, Chief Officer Corporate Solutions 
Report for Decision 
1 Recommendations
Council is asked to agree the appended submission in response to the
call for views from the Scottish Parliament’s - Finance and Public
Administration Committee as part of its pre-budget scrutiny. 
2 Purpose of Report/Executive Summary 
On 24th June 2022, as part of its pre-budget scrutiny, the Finance and
Public Administration Committee of the Scottish Parliament launched a
call for views on Scotland's public finances in 2023-24 and the impact
of the cost of living and public service reform. 
While the deadline for responses was set for Friday 19 August 2022
the clerk to the committee has advised that she is content for the
Council to submit a late response to the call for views so allowing
Council to consider the draft submission at today’s meeting.   
The call for views highlights that the committee is particularly interested
in views on how the rising cost of living will impact on the Scottish
budget in 2023-24 and will the Scottish Government’s proposals for
reforming the public service deliver the efficiencies expected.     
Date:  22 July 2022 
Report Contact: 
Name: Gary Fairley  
Tel No 0131 271 3310
gary.fairley@midlothian.gov.uk
Item 8.6
Page 121 of 340

Page 122

2 
3 Background 
The Scottish Parliament’s Finance and Public Administration
Committee was established in June 2021 and focusses on:
• Scotland’s public finances
• Public service reform
• The National Performance Framework
• Public administration in government. 
Kenneth Gibson MSP is the Convenor of the Committee with
membership consisting of the following MSP’s :- Daniel Johnson , Ross
Greer,  Douglas Lumsden, John Mason, Liz Smith and Michelle
Thomson. 
The work of the Committee includes Scotland's public finances in 2023-
24: the impact of the cost of living and public service reform. The focus
of the committees pre budget scrutiny for 2023-24 includes  is
consideration of how  the rising cost of living will impact on the Scottish
Budget in 2023-24 and will the Scottish Government’s proposals for
reforming the public service deliver the efficiencies expected. 
Pre-budget scrutiny aims to:
• influence how the Budget is prepared
• improve transparency and increase public awareness of the
Budget
• consider how the Scottish Government’s Budget for 2023-24
should respond to new fiscal and wider policy challenges
• lead to better results and outcomes when compared against the
Scottish Government’s targets and goals. 
Pre-budget scrutiny normally takes place in the months leading up to
the Scottish budget. As part of this year’s pre-budget scrutiny the
Committee will use this year’s Resource Spending Review by the
Scottish Government to inform its pre-budget scrutiny. The Resource
Spending Review aims to set out spending plans for the remainder of
the parliamentary term in support of the government's ambitions from
2023-24 to 2026-27. 
The committee will focus primarily on three areas from the spending
review: 
• Proposals for public service reform,
• Impact of the cost of living crisis on the Scottish Budget 2023-
24, and
• How spending priorities might affect the delivery of national
outcomes. 
The following key documents will inform the committee’s pre-budget
scrutiny: 
Page 122 of 340

Page 123

3 
• Scotland’s Economic and Fiscal Forecasts – May 2022 by the
Scottish Fiscal Commission
• the Scottish Government’s  Resource Spending Review (RSR),
and
• the Scottish Government’s  Medium-Term Financial Strategy
(MTFS). 
These documents were all published on 31 May 2022 alongside a
targeted review of the Scottish Government’s 2021-22 to 2025-26
Capital Spending Plans, setting out capital funding allocations by
portfolio for 2022-23 to 2025-26. 
The call for evidence runs from 24 June until 19 August 2022 with the
committee then hearing oral evidence in late September / early October
2022 with the Committee then considering its draft report which will be
published shortly after. 
4.0 The Call for Views 
The Committee has set out specific questions to which it is seeking
responses as detailed below. The proposed response to these question
is set out in the appendix to this report.  
1. The Scottish Government’s Resource Spending Review assumes that the
current taxation policies are maintained while funding for health and social
care and social security is prioritised. Are these the right priorities and
approach for the Scottish Budget 2023-24 and until 2026-27? 
2. The Scottish Fiscal Commission (SFC) notes that Scottish income taxes
have grown more slowly than the rest of the UK and is forecasting
Scottish taxes to be around £360 million less in 2023-24 than they would
be without income tax devolution. The SFC is also forecasting that, as a
result of forecast error, the Scottish Budget in 2023-24 could be £221
million lower. How should the Scottish Government’s Budget 2023-24
respond to this challenge? 
3. How should the Scottish Government respond to inflationary pressures
and the cost of living crisis in its Budget 2023-24? 
4. The Spending Review identifies key areas of reform over the lifetime of
the Parliament to support its priorities in the Spending Review, including
delivering efficiency savings across the public sector. How should the
Scottish Government approach each of these areas to achieve
efficiencies while also maintaining effective public services? 
• digitalisation
• maximising revenue through public sector innovation
• reform of the public sector estate
• reform of the public body landscape
• improving public procurement 
5. How effective do you think these reforms will be in delivering efficiency
savings in the Scottish Budget 2023-24, and beyond? If you have
Page 123 of 340

Page 124

4 
additional or alternative priorities for achieving efficiencies (for example
within your public sector area), please provide details. 
6. What impact will the Spending Review priorities have on the delivery of
national outcomes in the National Performance Framework? 
7. How should the Scottish Government target spending in its budget to
achieve net zero targets? 
8. How has the Scottish Government reflected its commitment to fiscal
transparency in the Spending Review and how can it best ensure that
spending in the Budget 2023-24 can be properly identified and tracked?   
5 Report Implications (Resource, Digital, Risk and Equalities) 
5.1 Resource 
While the subject matter encompasses resources there are no direct
resource implications arising from the report itself. 
5.2 Digital 
There are no digital implications associated with the recommendations. 
5.3 Risk 
There are no risks directly associated with making a submission. The
response to the questions posed by the Committee highlight the risk
the Resource Speeding Review presents for local government. 
There are no equality implications associated with making a
submission. 
5.5 Additional Report Implications (See Appendix A) 
Appendices 
Appendix A – Additional Report Implications 
5.4 Ensuring Equalities
Page 124 of 340

Page 125

5 
APPENDIX A – Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Sustainable funding is critical to the delivery of the Midlothian Local
Plan. By making a submission as part of the call for evidence the
Council can seek to influence the pre-budget scrutiny of the Scottish
Government’s budget for 2023-24. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
A.4 Delivering Best Value 
No direct implications though sustainable funding is central to how and
which services can be provided 
A.5 Involving Communities and Other Stakeholders
There has been no wider engagement in drafting this submission
although the call for views is  open to all and Trade Union colleagues
have been made aware of the opportunity to make submissions. 
A.6 Impact on Performance and Outcomes
None 
A.7 Adopting a Preventative Approach
Page 125 of 340

Page 126

6 
No direct impact. 
A.8 Supporting Sustainable Development 
No direct impact. 
Page 126 of 340

Page 127

7 
Appendix 
Scotland's public finances in 2023-24: the impact of the cost of living
and public service reform. 
Call for views – Draft Submission by Midlothian Council 
1. The Scottish Government’s Resource Spending Review assumes that
the current taxation policies are maintained while funding for health and social
care and social security is prioritised. Are these the right priorities and
approach for the Scottish Budget 2023-24 and until 2026-27? 
Response 
Commentators on the RSR have recognised the impact on Local
Government, with both SPICe and Fraser of Allander stating that the
proposals essentially represent a 7% real terms decrease in funding
between 22/23 and 26/27. 
This is in contrast to the 4.7% real terms increase that the Scottish
Government will see overall (2% if social security transfers are
excluded), and the real terms increases that Health, Social Justice and
Housing will see. 
The real term decrease planned for Local Government comes on top of
significant real term reductions since 2013/14, which has driven ongoing
reform, rationalisation, innovation and transformation work across Local
Government.  
The commitments made in the RSR do not recognise or address the
need for investment in upstream drivers and the role of the whole
system in delivering this. The areas that show greatest investment are
“downstream” areas as opposed to investing in the social determinants
of health further upstream e.g. housing, employability, training etc. 
In a similar vein the RSR does not give adequate prioritisation towards 
directing resources to support the impact of population growth noting
that sustainable and inclusive population growth is critical to the growth
of the Scottish economy. The financial implications of growth in areas
such as Midlothian are now very real, and at a significant scale, and the
ability to manage these collectively at a time when the authority is facing
financial challenges of an unprecedented scale is becoming impossible
to sustain.   
Local Authorities can be the largest employer in their area. The
reduction in the overall public sector workforce, if applied to local
authorities will reduce the availability of jobs and so can only further
exacerbate  the cost of living crisis for those who may lose jobs or have
reduced opportunities for employment as a consequence of workforce
reductions.   
Page 127 of 340

Page 128

8 
Scottish Government is choosing to continue to direct spend at
addressing problems, not preventing them occurring and also
supporting those areas facing population decline at the expense of
areas grappling with population growth. Increases in funding are
proposed for Health and Social Justice but not for Local Government
and the economy, the areas that can really address child poverty. By the
end of 2026/27
• Health and Social Care spending will account for 40% of Scottish
Government’s resource spending
• Social Security assistance will account for 13%
• Local Government’s core funding will account for 22% 
Investment by Councils in universal services such as leisure,
communities, youth work and lifelong learning can support prevention.
However due to continued budget reductions to these services they are
no longer able offer the breadth of preventative services required to
support health and economic inclusion. 
2. The Scottish Fiscal Commission (SFC) notes that Scottish income
taxes have grown more slowly than the rest of the UK and is forecasting
Scottish taxes to be around £360 million less in 2023-24 than they would be
without income tax devolution. The SFC is also forecasting that, as a result of
forecast error, the Scottish Budget in 2023-24 could be £221 million lower.
How should the Scottish Government’s Budget 2023-24 respond to this
challenge? 
Response 
In developing its response to the overall quantum of resources that
Scottish Government expects to have for financial year 2023-24 the RSR
presents a further erosion of core funding for Local Government
services. Councils, their partner providers, suppliers and employees are
not immune from the cost of living crisis. Without adequate funding
critical local services which those furthest from living well locally rely on
will be cut with the inevitable loss of jobs further impacting on the local
economy. 
Adequate funding for Local Government is essential to support a strong
vibrant and inclusive economy for the whole country. A necessity to
grow the tax base and grow income tax receipts. 
Supporting a vibrant and growing economy for Scotland needs adequate
recognition and provision of funding to support services in areas of
population growth and especially to fund the recurring revenue costs of
those services which are essential to sustain a local population growth.   
3. How should the Scottish Government respond to inflationary pressures
and the cost of living crisis in its Budget 2023-24? 
In the absence of additional income to the Scottish budget through tax
receipts or the block grant the Scottish Government, like all individuals
Page 128 of 340

Page 129

9 
and organisations, needs to accept that the inflationary pressures
currently being experienced represent an erosion of its spending power. 
It is appreciated that difficult decisions need to be made to balance
budgets nationally and locally. However by continuing to prioritise and
or protect initiatives or sectors such as health from the economic reality
cannot be sustained at the expense of Local Government and the critical
services which local government provide across the country. 
The proposals in the RSR represent a real terms reduction for Local
Government of 7%, and the Scottish Government needs to recognise the
inflationary pressures across all areas of the public sector and not
protect some at the expense of local government services. 
The RSR indicates that pay inflation pressures may be managed by
seeking to keep the overall public sector paybill static, so meeting
inflationary pressures by reducing the size of the public sector
workforce.   
The feasibility of this for Local Government is questionable. Between
2006 and 2018, there was a steady reduction in Local Government
workforce due to significant efficiency savings and service
transformation programmes. By 2018 the workforce had reduced by
circa 15% from 2006 levels. Significant Scottish Government policy
direction since 2018 and the need to respond to COVID has meant staff
increases to the extent that if staffing for additional commitments is
removed, the Local Government staffing levels would be back at 2018
levels. 
This is in contrast to trends in other parts of the public sector which
have seen Scottish Government nearly double since 2006, Scottish
Government agencies grow by 15% and NDPBS more than double. 
4. The Spending Review identifies key areas of reform over the lifetime of
the Parliament to support its priorities in the Spending Review, including
delivering efficiency savings across the public sector. How should the Scottish
Government approach each of these areas to achieve efficiencies while also
maintaining effective public services? 
• digitalisation
• maximising revenue through public sector innovation
• reform of the public sector estate
• reform of the public body landscape
• improving public procurement 
Response 
Local Government has been managing significant real term cuts to core
funding for many years adopting digitisation, innovation, estate
rationalisation and improved procurement to help mitigate the impact of
these real term cuts. Any “easy” savings have been taken across Local
Government. The continual cycle of cuts deflects effort from a concerted
focus on prevention and improving outcomes.
Page 129 of 340

Page 130

10 
Whilst these areas of reform are all appropriate in the context of the
Scottish Government’s budget it is difficult to assess the extent to which
they will contribute to mitigating the inflationary pressures and so
support the spending review. 
It is difficult to determine the extent to which any savings from these
initiatives have already been accounted for in arriving at the RSR
allocations for Local Government and other sectors and so the question
of targets may be one that that committee may wish to scrutinise both in
terms of quantum and deliverability. 
In respect of reform of the public body landscape any change should be
evidence led and have clear outcomes. 
5. How effective do you think these reforms will be in delivering efficiency
savings in the Scottish Budget 2023-24, and beyond? If you have additional or
alternative priorities for achieving efficiencies (for example within your public
sector area), please provide details. 
The measures set out in question 4 will no doubt have a lead time for
delivery and require upfront investment to secure the change required. It
is difficult from the information provided to comment on how effective
they can be. From a Local Government perspective and give the extent
of change already secured over many years it is challenging to see how
these initiatives could come anywhere near close to mitigating the 7%
real terms reduction. 
6. What impact will the Spending Review priorities have on the delivery of
national outcomes in the National Performance Framework? 
As set out the RSR will have a significant negative effect on Local
Governments ability to delivery of national outcomes in the National
Performance Framework. 
7. How should the Scottish Government target spending in its budget to
achieve net zero targets? 
Response 
The cash flat settlements for Local Government set out in the Capital
Spending Review provide no additional capacity to Local Government to
take forward the necessary investment in its asset base to shift to net
zero targets. As such the CSR does not appear to make any attempt to
targets spending to help Councils achieve net zero targets. 
There needs to be engagement between levels of Government to
understand the costs of achieving net zero targets and how best to
funding these across the whole public sector.  
Page 130 of 340

Page 131

11 
8. How has the Scottish Government reflected its commitment to fiscal
transparency in the Spending Review and how can it best ensure that
spending in the Budget 2023-24 can be properly identified and tracked?   
No observations to make.  
Page 131 of 340

Page 132

Page 132 of 340

Page 133

Midlothian Council
23 August 2022 
Risk Management Policy and Strategy 
Derek Oliver, Chief Officer Place 
Report for Decision 
1 Recommendations 
Council is recommended to: 
a) approve the content of the revised Risk Management Policy and    
Strategy; 
b) instruct the Chief Officer Place to lead the adoption and    
implementation of the Risk Management Policy and Strategy   
across the Council; and 
c) agree to review the Risk Management Policy and Framework in    
two years. 
2 Purpose of Report/Executive Summary 
Council is presented with the revised Risk Management Policy and
Strategy, which outlines the proposed approach to risk management
and governance arrangements for risk monitoring and accountability.
The Framework development has included a consultation process with
the Council’s Audit Committee. 
Date 15 July 2022 
Report Contact:
Derek Oliver, Chief Officer Place, Derek.Oliver@midlothian.gov.uk 
Item 8.7
Page 133 of 340

Page 134

2 
3 Background/Main Body of Report 
3.1 The Council has seen unprecedented change over the last two years,
and has successfully maintained critical services in response to a
global pandemic. It has demonstrated its competence to manage risk
effectively during this time, and its agility when operating within a series
of government directed constraints including lockdowns and whilst
transitioning through to recovery. 
3.2 Whilst the Council’s response has shown that risk has been managed
appropriately and proportionate mitigations have been applied, the
events of the last two years should be reflected in the Council’s risk
management approach moving forwards. 
3.3 The Risk Management Policy and Strategy was reviewed in mid-2021.
A Risk and Resilience Group was established with membership drawn
from Chief Officers and Senior Managers across the Council and Audit
Service. This group has informed the revised policy and strategy. The
draft Risk Management Policy and Strategy was presented to
Corporate Management Team and then to Audit Committee on 7
December 2021, where it was decided to refer to Council for approval. 
Risk Management Policy and Strategy - summary 
3.4 Midlothian Council acknowledges that risk can never be eliminated in
its entirety. The Council also recognises that managing risk can also
identify positive opportunities which, with the appropriate level of
control, may lead to service improvements. Therefore, the measures
which the Council adopts are principles of good management practice
which seek to control and balance risk and opportunity. 
Specifically, in the area of risk management, the Council seeks to: 
• Always meet its statutory obligations, and to act within the law.
• Safeguard the public at large, the Council's members,
employees, pupils, tenants and all persons to whom the Council
has a duty of care. 
• Protect its property, including buildings, equipment, vehicles or
any other assets and resources. 
• Preserve and enhance service delivery. 
• Maintain effective control of public funds. 
• Maintain and enhance the Council's reputation. 
• Safeguard and enhance the quality of Midlothian’s environment. 
3.5 The objective of the revised Policy and Strategy is to ensure that risk
management is an integral part of the Council's corporate and service
management, forms part of the Council's governance, planning and
service delivery operations and allows for monitoring and reporting on
the effectiveness of that strategy. 
Page 134 of 340

Page 135

3
3.6 The strategy and policy applies to all of Midlothian Council’s core
functions. Where Midlothian Council enters into partnerships, contracts
and agreements the principles of risk management established by this
strategy and policy and supporting guidance should be considered as
best practice and applied where possible. It is also expected that our
significant contractors have risk management arrangements at a similar
level, which should be established and monitored through
commissioning processes and contract management arrangements. 
3.7 It is essential that a single risk management approach be utilised at all
levels throughout the Council. By demonstrating good governance
through effective management of risks and opportunities, the Council
will be in a stronger position to deliver our objectives, provide improved
services to the public, work better as a partner with other organisations
and achieve value for money. 
3.8 Risk management is a part of service and corporate/strategic
management and accordingly is integrated within normal management
processes. The Chief Executive has overall responsibility for the
management of risk within Midlothian Council. The Chief Officer Place
will have responsibility for ensuring that the Council’s Risk
Management Strategy, Policy and Strategic Risk Register/Profile are
maintained and regularly reviewed. 
3.9 The Strategic Risk Profile will be reviewed quarterly, or where a new
significant risk is identified. A quarterly risk management report is
presented to the Audit Committee which reports on the Council’s
strategic risks. In addition, the Council Management Team is provided
with a regular risk management report on strategic and organisational
risks. 
3.10 The Risk Management & Resilience Group provides recommendations
to the Council Management Team on the escalation, de-escalation and
closure of strategic level risks. Directorates and services undertake
quarterly review, monitoring and reporting on their risk registers
(supported by the risk management function) in order to ensure that
risks are identified and escalated to the appropriate level at an early
stage. 
3.11 The full draft Risk Management Policy and Strategy is contained in
Appendix B. Council is asked to consider and approve the contents
within. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
There are no significant resource implications to adopting the Risk
Management Policy and Strategy. There may be individual impacts
when carrying out risk assessments and mitigation actions that will
require to be managed by the respective service. 
Page 135 of 340

Page 136

4
4.2 Digital 
The Risk Management Policy and Strategy is a document and the risk
registers/profiles are stored within Pentana which is an existing Council
system. There are no additional requests relating to Digital therefore no
impact. 
4.3 Risk 
The risk of not having a robust Risk Management Policy and Strategy
is that the Council does not fulfil its statutory duty. Good governance
leads to good management, good performance, good stewardship of
public money, good public engagement and, ultimately, good outcomes
for citizens and service users. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
The Risk Management Policy and Strategy will ensure that that Council
meets its statutory requirements including those under the Equalities
Act 2010. The Risk Management Policy and Strategy will help the
Council to safeguard the public at large, the Council's members,
employees, pupils, tenants and all persons to whom the Council has a
duty of care. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Risk Management Policy and Strategy 
Page 136 of 340

Page 137

5
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Risk management is an integral part of the Council's corporate and
service management, forms part of the Council's governance, planning
and service delivery operations and allows for monitoring and reporting
on the effectiveness of that strategy.  The Risk Management Policy and
Strategy should underpin all of the priorities within the Single Midlothian
Plan. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The Council’s commitment to best value and securing continuous
improvement can best be delivered when decisions are made against a
backdrop of understanding the risks and opportunities before an
organisation. The Risk Management Policy and Strategy seeks to
provide the framework in which the current risk environment is
understood and demonstrate that Midlothian Council is taking
appropriate action in response to those identified risks. 
A.5 Involving Communities and Other Stakeholders 
The Risk Management Policy and Strategy was informed by the Risk
and Resilience Group, Corporate Management Team and Audit
Committee. 
Page 137 of 340

Page 138

6
A.6 Impact on Performance and Outcomes 
Formal monitoring and accountability procedures form an integral part of
the risk management process, covering the following three main issues: 
• Delivering the risk management strategy. 
• Implementing risk management action plans, both corporate/strategic
and service. 
• Determining whether the related actions are making a difference to the
risk, as appropriate. 
A.7 Adopting a Preventative Approach 
The Risk Management approach being taken by the Council is founded
on a preventative approach to managing risks, where appropriate and
more generally to decision making with far greater risk awareness. 
A.8 Supporting Sustainable Development 
Senior Managers must ensure the sustainability of the Council, which
entails identifying, understanding and managing Strategic and Service
level Risks and Opportunities. 
Page 138 of 340

Page 139

7 
APPENDIX B
Midlothian Council 
Risk Management Policy and Strategy 
1. Policy Statement 
Midlothian Council understands that it is important to recognise and manage the
many risks which are inherent in its activities, and in the services which it provides for
the benefit of the community. The Council has therefore adopted this policy on risk
management, has established the attached Risk Management Strategy and has
implemented procedures in support of the policy and strategy. 
Midlothian Council acknowledges that risk can never be eliminated in its entirety. The
Council also recognises that managing risk can also identify positive opportunities
which, with the appropriate level of control, may lead to service improvements.
Therefore, the measures which the Council adopts are principles of good
management practice which seek to control and balance risk and opportunity. 
Specifically, in the area of risk management, the Council seeks to: 
• Always meet its statutory obligations, and to act within the law. 
• Safeguard the public at large, the Council's members, employees, pupils,
tenants and all persons to whom the Council has a duty of care. 
• Protect its property, including buildings, equipment, vehicles or any other
assets and resources. 
• Preserve and enhance service delivery. 
• Maintain effective control of public funds. 
• Maintain and enhance the Council's reputation. 
• Safeguard and enhance the quality of Midlothian’s environment. 
The Council will promote these objectives by systematically identifying, evaluating,
and thereafter seeking to control and monitor all risks which would potentially
endanger, or which could have a detrimental effect upon the aims and objectives
stated above. 
The Council will support its members and officials in developing the necessary skills
and competencies to enable the provision of good quality risk management to the
Council.
There is a commitment to embedding risk management throughout Midlothian
Council, promoting a positive risk culture and making it a part of everyday service
delivery and decision-making, ensuring that sufficient resources are allocated. This
includes fostering an environment that embraces openness, supports integrity,
objectivity, accountability and transparency in the identification, assessment and
management of risks, welcoming constructive challenge and promoting collaboration,
consultation and cooperation. 
Risk Management enhances strategic planning and prioritisation, assists in achieving
objectives and strengthens the ability to be agile to respond to the challenges faced.
To meet our objectives, improve service delivery and achieve value for money for the
residents of Midlothian, risk management will be an essential and integral part of
planning and decision-making. 
Page 139 of 340

Page 140

8 
2. Introduction 
The objective is to ensure that risk management is an integral part of the Council's
corporate and service management, forms part of the Council's governance, planning
and service delivery operations and allows for monitoring and reporting on the
effectiveness of that strategy. 
The strategy acknowledges that risks occur at all levels of the Council's functions and
activities and includes strategic or corporate risks as well as innumerable operational
risks. 
This strategy and policy applies to all of Midlothian Council’s core functions. Where
Midlothian Council enters into partnerships, contracts and agreements, the principles
of risk management established by this strategy and policy and supporting guidance
should be considered as best practice and applied where possible. It is also expected
that our significant contractors have risk management arrangements at a similar
level, which should be established and monitored through commissioning processes
and contract management arrangements. 
3. Terminology 
Governance
The system by which local authorities fulfil their purpose and achieve their intended
outcomes for citizens and service users and operate in an effective, efficient,
economic and ethical manner. Good governance leads to good management, good
performance, good stewardship of public money, good public engagement and,
ultimately, good outcomes for citizens and service users. 
Risk
The chance or possibility of loss, damage, injury or failure to achieve objectives
caused by an unwanted or uncertain action or event. This can be further defined as
“the combination of the likelihood of an event occurring (or not occurring, as the case
may be) and its impact on the organisation”. 
Risk Management
The planned and systematic approach to the identification, evaluation and control of
risk. The objective of risk management is to secure the assets and reputation of the
organisation and to ensure the continued financial and organisational well-being of
the Council. All organisations exist to achieve their objectives. The purpose of risk
management is to manage the barriers in achieving these objectives. 
Effective risk management
Having a process in place that can identify what might go wrong, what the
consequences might be of something going wrong and finally, deciding what can be
done to reduce the possibility of something going wrong. If something does go
wrong, making sure that the impact is kept to a minimum. Good risk management is
successfully managing the barriers to achieving objectives. 
Page 140 of 340

Page 141

9
4. Objectives 
Midlothian Council is committed to establishing and maintaining a systematic
approach to the identification and management of risk. 
The Council’s risk management objectives are to: 
• Ensure that risk management is clearly and consistently integrated and
evidenced in the culture of the Council. 
• Manage risk in accordance with best practice. 
• Anticipate and respond to changing social, environmental and legislative
requirements. 
• Consider compliance with health and safety, insurance and legal
requirements as a minimum standard. 
• Prevent death, injury, damage and losses, and reduce the cost of incidents
and accidents.
• Inform policy and operational decisions by identifying risks and their likely
impact.
• Raise awareness of the need of risk management by all those connected with
the Council's delivery of service.
• Recognise that good risk management also includes positive risk taking and
the identification of opportunities. 
These objectives will be achieved by: 
• Clearly defining the roles, responsibilities and reporting lines within the
Council for risk management. 
• Setting out clear risk management processes. 
• Continuing to demonstrate the application of risk management principles in
the activities of the Council, its employees and members. 
• Reinforcing the importance of effective risk management as part of the
everyday work of employees and members. 
• Maintaining a register of risks linked to the Council's business, strategic and
operational objectives, including those risks linked to working in partnership. 
• Maintaining documented procedures of the control of risk and provision of
suitable information, training and supervision. 
• Maintaining an appropriate system for recording health and safety incidents,
responses and identifying preventative measures against recurrence. 
• Preparing contingency plans to secure business continuity where there is a
potential for an event to have a major impact upon the Council's ability to
function. 
• Monitoring arrangements continually and seeking continuous improvement. 
5. Approach 
It is essential that a single risk management approach be utilised at all levels
throughout the Council. By demonstrating good governance through effective
management of risks and opportunities, the Council will be in a stronger position to
deliver our objectives, provide improved services to the public, work better as a
partner with other organisations and achieve value for money. 
Page 141 of 340

Page 142

10
This approach to risk management will inform the Council's business processes,
including: 
• Strategic planning. 
• Financial planning. 
• Service planning. 
• Policy making and review. 
• Performance management.
• Project management. 
• Partnership working. 
It is essential in order to achieve the objectives referred to in section 4 that processes
are in place to identify and assess risks and opportunities, develop and implement
controls and warning mechanisms, and to review and report on progress. 
The identified risks and relevant control measures will be managed through the
Council's Strategic Risk Register.
There are five key principles of risk management that provide the basis on which
Midlothian Council will manage risk: 
A. Governance and Leadership – risk management shall be an essential part of
governance and leadership, and fundamental to how the organisation is directed,
managed and controlled at all levels. 
B. Integration – risk management shall be an integral part of all organisational
activities to support decision-making in achieving objectives. 
C. Collaboration and Best Information – risk management shall be collaborative
and informed by the best available information. 
D. Structured Processes – risk management processes are recognised as iterative
in practice, rather than sequential, and shall be structured to include: 
Risk Identification and Assessment – to determine and prioritise how the
risks should be managed. 
Risk Treatment – the selection, design and implementation of risk treatment
options that support achievement of intended outcomes and manage risks to
an acceptable level. 
Risk Monitoring – the design and operation of integrated, insightful and
informative risk monitoring. 
Risk Reporting – timely, accurate and useful risk reporting to enhance the
quality of decision-making and to support management and oversight bodies
in meeting their responsibilities. 
E. Continual Improvement – risk management shall be continually improved
through learning and experience. 
6. Status of Risk Management 
Risk management is as much a part of the duties of Council officials as, for example,
the control of budgets or the deployment of staff and assets. It is one of many
substantive issues to be considered by elected members when making decisions. If
the Council is to have reasonable assurance that risk management is effective, and
is effectively part of the Council's operations, risk management must be carried out in
a systematic and structured manner and be subject to monitoring and reporting on its
effectiveness. 
Page 142 of 340

Page 143

11
7. Management Arrangements 
Risk management is a part of service and corporate / strategic management and
accordingly is integrated within normal management processes. 
The Risk Management Reporting Framework illustrates the Council’s risk
management structure: 
The Chief Executive has overall responsibility for the management of risk within
Midlothian Council. 
Chief Officer – Place will have responsibility for ensuring that the Council’s Risk
Management Strategy, Policy and Strategic Risk Register/Profile are maintained and
regularly reviewed. Risk owners will be clearly identified within the Strategic Risk
Profile. The Strategic Risk Profile will be reviewed quarterly, or where a new
significant risk is identified. The reviewed Strategic Risk Profile will be presented to
the Council Management Team for approval and thereafter to the Audit Committee. 
Executive Directors will have responsibility for ensuring the Strategic Risk Profile is
compiled and maintained in respect of their Service. 
Chief Officers will be responsible for ensuring all risks falling within their service
portfolio are reviewed quarterly, or where a new risk is identified. 
Senior Managers will ensure that Service Risk Registers are reviewed quarterly, or
where a new risk is identified. Any identified risk which has a wider corporate impact
will be escalated to the Strategic Risk Register. 
Strategic Partnerships /
Projects Executive Audit
Committee
Council
Management Team
Risk Management &
Resilience Group
Services  External Audits &
Inspections
Operational Projects
/ Working Groups
Internal Audit Corporate Working
Groups / Projects /
Partnerships
Page 143 of 340

Page 144

12
The Council Management Team shall: 
• Determine the levels of risk and outcomes that are tolerable and acceptable
to achieve the Council's objectives. 
• Provide advice to elected members on the type and amount of risk to accept
when making policy decisions. 
• Assume ownership of the strategic risks recorded in the Strategic Risk Profile. 
• Carry out a strategic overview of the Strategic Risk Profile quarterly. 
• Promote and support the implementation of the risk management policy and
strategy throughout the Council. 
Identified risks will be allocated to an officer of the CMT and each risk will be
accompanied by an assessment of likelihood and impact. Registers will be
accompanied by related actions, highlighting the means by which the risk will be
controlled. 
There are some aspects of operational risk management which benefit from
corporate support and co-ordination. There is also a need for the Council to be able
to demonstrate that risk management arrangements are effective, through the Audit
Committee. 
The Risk Management & Resilience Group consists of at least one senior
representative from each directorate of the Council. This is not a decision-making
body, as recommendations that have a strategic or corporate impact are referred to
the Council Management Team.  
The Audit Committee evaluates and recommends approval of the strategies and
frameworks in respect of risk management.  The Committee approves updates and
provides direction in respect of risks held within the strategic risk profile. 
The Risk Management Policy and Strategy will be reviewed every two years. 
8. Health & Safety 
The Council has responsibilities under health and safety legislation to ensure the
health, safety and welfare at work of employees and other people affected by the
Council's business. Managing health and safety risks is an integral part of business
risk management and the management of such risks should not be taken in isolation.
Poor health and safety management can have a negative impact on other business
risks such as reputation, insurance, business continuity and financial resources. 
The effective management of health and safety risks, as with all significant corporate
risks, is an essential part of the role of the relevant managers. The organisation and
arrangements for managing health and safety within the Council are detailed in the
Council’s Health and Safety Policy documents. 
9. Business Continuity 
The business continuity process is essentially risk management applied to the whole
organisation and its ability to continue with its service provision in the event of a
catastrophic or a localised operational impact event. The Council ensures risk
management processes are applied throughout the business continuity lifecycle. 
Page 144 of 340

Page 145

13
10. Monitoring and Accountability 
Formal monitoring and accountability procedures form an integral part of the risk
management process, covering the following three main issues: 
• Delivering the risk management strategy. 
• Implementing risk management action plans, both corporate/strategic and
service. 
• Determining whether the related actions are making a difference to the risk,
as appropriate. 
The following monitoring arrangements are in place:  
• Risk registers are presented to the Audit Committee quarterly to advise
members of the risks which may affect the achievement of the Council’s
strategic objectives. 
• Service risks are monitored through quarterly performance reports so that any
performance risks are highlighted to the Council Management Team through
exception reporting. 
• Ensuring that the Risk Management & Resilience Group continues to be an
effective and streamlined means of maintaining an overview of risk
management and supporting corporate and strategic consistency in the
implementation of the risk management policy. 
• Internal Audit’s role includes the auditing of the risk management process
across the Council and the reporting on the efficiency and effectiveness of
internal controls. 
11. Approach to Risk Management 
Risk Management Process – ISO31000 
The above diagram demonstrates the whole process and cycle of risk management
under the international standard ISO 31000. 
The standard as outlined above makes clear that risk management is a dynamic
process, with frequent review of existing risks and monitoring of the environment
necessary to ensure the risks captured represent the current profile of the
organisation.  
Continual communication of risks within the organisation is essential to allow for
informed decision-making. Communication to the Audit Committee and other
stakeholders is imperative to allow effective scrutiny and provide assurance that the
risk profile is being effectively managed. 
Page 145 of 340

Page 146

14
Risk Identification 
The aim of risk identification is to recognise and articulate the risks that may help or
prevent Midlothian Council to achieve its objectives. It is particularly relevant to
consider new or emerging risks alongside business planning and strategy formulation
processes. 
There are several risk perspectives: 
Corporate - Those risks, which if they occurred, would have a major impact on the
organisation or delivery of its priorities. Corporate risks also include cross-cutting
risks that impact across directorates. 
Change related (Programme / Project) – where we are exposed to risks that could
affect our ability to successfully complete the desired transformational outcomes or
deliver predefined outputs that enable us to deliver outcomes and realise benefits. 
Operational / Service / Contract – where we are exposed to risks that could affect
our control and ability to successfully and continually deliver or commission services
to our service users / residents. 
The following factors, and the relationship between these factors, should be
considered when identifying risks: 
• Changes in the external and internal context 
• Causes and events 
• Consequences and their impact on objectives 
• Threats and opportunities 
• Vulnerabilities and capabilities 
• Uncertainties and assumptions within options, strategies, plans or initiatives
• Indicators or emerging risks
• Limitations of knowledge and reliability of information
• Time-related factors
• Any potential biases and beliefs of those involved. 
Risks will be identified whether or not their sources are under the Council’s direct
control, as they have the potential to impact on achievement of objectives, causing
great damage or creating significant opportunity. 
Assessment / Analysis of Risk
The aim of risk analysis is to build understanding of the nature of risk and its
characteristics including, wherever possible, the level of risk. It involves consideration
of uncertainties, risk sources, consequences, likelihood, events, scenarios, controls
and their effectiveness. Analysis techniques can be qualitative, quantitative or a
combination of these, depending on the circumstances and intended use. 
The assessment, or scoring, of risk allows for prioritisation by evaluation.
Determining the likelihood and impact of a risk and utilising a standardised
assessment criteria to assign a score based on these factors allows the Council to
understand and prioritise which risks to mitigate first. 
1 2 3 4 5
Likelihood Rare Unlikely Possible Likely Almost Certain
Impact Negligible Minor Moderate Major Extreme 
Page 146 of 340

Page 147

15
Risk Assessment Matrix 
The risk assessment matrix is a 5x5 scoring mechanism which will identify a score
between 1 (1x1) at the lowest (very low) and 25 (5x5) at the highest possible score
(critical). 
The risk assessment matrix is summarised below: 
Risk Evaluation 
Once analysed, risks will be evaluated to compare the results against the nature and
extent of risks that the organisation is willing to take or accept to determine where
and what additional action is required. 
Controls 
Risk controls are management measures put in place to effectively manage a risk to
within acceptable levels (i.e. within target score). It is essential that the controls put in
place to manage a risk are effective. The identification of effective controls is the
most important part of the whole risk management process as without this element
the Council would simply be identifying risks and doing nothing to manage them. 
There are two main types of control measure that can be put in place to manage a
risk: 
• Preventative Controls: These are mitigating actions which will work to control
the cause of the risk and prevent it happening in the first place
• Contingency Controls: These are actions that can be put in place to reduce
the impact of the risk if it does materialise. 
Risk Appetite, Tolerance and Escalation 
Midlothian Council recognises that risk is inherent in delivering and commissioning
services and does not seek to avoid all risk, but instead aims to have an ‘open’
approach to risk, appropriately balancing risk against reward, with risks managed in a
proportionate manner. 
This will require an approach that allows flexibility and support for well-informed and
considered risk taking, promoting transparency and effective risk management, while
maintaining accountability. While risks defined as ‘high’ are to be managed down to a
tolerable level wherever possible, it is important that risks across the Authority are
not over-controlled. 
5 Low
5 
Medium
10 
Medium
15 
High
20 
Critical
25 
4 Very
Low
4 
Low
8 
Medium
12 
High
16 
High
20 
3 Very
Low
3 
Low
6 
Medium
9 
Medium
12 
Medium
15 
2 Very
Low
2 
Low 
4 
Low
6 
Low
8 
Medium
10 
1 Very
Low
1 
Very Low
2 
Very Low
3 
Low
4 
Medium
5  
1 2 3 4 5
IMPACT
LI
K
E
LI
H
Page 147 of 340

Page 148

16 
It is not realistic for the Council, with its diverse range of services and duties, to have
just one definitive application of risk appetite across the entire organisation. Instead,
risk appetite should be set with reference to the strategy for service delivery in each
particular area. However, examples of risks that would be seen as intolerable are
those that are likely to:
• Negatively affect the safety of our service users, residents or employees.
• Severely damage the Authority’s reputation. 
• Lead to breaches of laws and regulations. 
• Endanger the future operations of the County Council (i.e. by exceeding the
risk capacity of the organisation – the amount of risk that the Authority can
bear).
• Adversely impact the financial security or resilience of the Council 
In addition, to aid managers in understanding what risks are acceptable, our appetite
for risk is implicitly defined within our standard for determining risk levels. Risks rated
as “Critical” will be deemed to have exceeded tolerance levels and will be subject to
escalation to the Risk Management & Resilience Group for review and action. The
target rating for a risk is expected to be ‘medium’ or lower. In the event that this is not
deemed realistic in the short to medium term, this shall be discussed as part of the
escalation process, and this position regularly reviewed with the ultimate aim of
bringing the level of risk to a tolerable level.
Risk Review 
Once the process of identifying, analysing and assessing a risk are complete, it is
imperative that it is subject to regular review. Ongoing management and review of a
risk is the most important part of the process as maintaining or reducing the risk
score to within an acceptable level assures the overall management of the
organisation’s profile. 
During a risk review, the risk is re-assessed. If it is identified that the risk continues to
exist, the list of current controls and further controls required must be checked, cross-
referenced and added to where necessary. On the basis of progress with controls
and an assessment of the risk environment, a re-assessment of the current score
must be made using the risk assessment matrix. This will show whether the risk is
decreasing, increasing or remaining static. Depending on its escalation level, a
change to risk score will be reported at the Audit Committee. 
Risk Reporting 
A quarterly risk management report is presented to the Audit Committee which
reports on the Council’s strategic risks. In addition, the Council Management Team is
provided with a regular risk management report on strategic and organisational risks. 
The Risk Management & Resilience Group provides recommendations to the Council
Management Team on the escalation, de-escalation and closure of strategic level
risks. 
Directorates and services undertake quarterly review, monitoring and reporting on
their risk registers (supported by the risk management function) in order to ensure
that risks are identified and escalated to the appropriate level at an early stage. 
Page 148 of 340

Page 149

17
Name of Document      Risk Management Policy and Strategy (v2)
Author Place 
Policy Ownership Chief Officer Place
Unit Responsible Protective Services
Approved by and date To be approved at Council 23.08.22
Assigned Review Period      2 years from approval date 
Date of Next Review 23.08.24 (tbc – subject to Council approval)
Policy Lead Senior Manger Protective Services 
Version Version date Authorised Officer Amendment
Details
V1  December 2021 Derek Oliver, Chief
Officer Place
Feedback following
presentation to
Audit Committee
V2 July 2022 Derek Oliver, Chief
Officer Place
Presented to
Council 23.08.22
for approval 
Page 149 of 340

Page 150

Page 150 of 340

Page 151

National Care Service (Scotland) Bill (“the NCS Bill”) 
Report by Suzanne Ross, Principal Solicitor 
1. Purpose of Report 
1.1. The purpose of this report is to:
(i) Note that a briefing of elected members will take place on 15th August 2022
(ii) Note the preparatory actions taken by CMT as outlined in this report
(iii) Provide an update as to the progress of the legislation which will underpin
the National Care Service;
(iv) Provide an overview of the NCS Bill;
(v) Draw elected members attention to the Health, Social Care and
Sport Committee, and other committees, who are looking at the details of the
proposals, and want to know what people think about them. Views can be
submitted by 2 September 2022 as outlined in section 2.6 
2. Background to the Bill 
2.1. In August 2021 the Scottish Government launched a consultation on the way in which
social care was delivered in Scotland.  The consultation followed recommendations
made in the Independent Review of Adult Social Care (the Feeley Report)1. 
2.2. The consultation ran for 12 weeks and closed in November 2021.  Over 1,300
responses to the consultation were received2.  Midlothian Council and Midlothian
HSCP provided responses3.  The independent analysis of responses was published in
February 20224. 
2.3. On 20 June 2022 the Scottish Parliament published the NCS Bill which will provide
the foundation for the NCS. Alongside the Bill, explanatory notes, a policy
memorandum, a financial memorandum and a delegated powers memorandum were
also published.5 
2.4. The Scottish Government also published the Statement of Benefits6 and the “Co-
design and National Care Service” Paper7.  It is intended that through an NCS Design
School the Scottish Government will work with people who access and deliver social 
1 Adult social care: independent review - gov.scot (www.gov.scot)
2 Published responses for A National Care Service for Scotland - Scottish Government - Citizen Space
(consult.gov.scot)
3 Response 312540760 to A National Care Service for Scotland - Scottish Government - Citizen Space
(consult.gov.scot) And Response 491813606 to A National Care Service for Scotland - Scottish Government -
Citizen Space (consult.gov.scot)
4 National Care Service: consultation analysis - gov.scot (www.gov.scot)
5 Introduced | Scottish Parliament Website
6 National Care Service: statement of benefits - gov.scot (www.gov.scot)
7 Supporting documents - National Care Service and co-design - gov.scot (www.gov.scot)
Item 8.8
Page 151 of 340

Page 152

care support to co-design parts of the National Care Service. 
2.5. A Bill passes through various Parliamentary stages.  The Bill is currently in Stage 1 of
the process.  It has been passed to the lead committee: the Health, Social Care and
Sport Committee who will speak with experts, organisations and members of the
public.  The lead committee is expected to provide a report on the Bill at the start of
2023.  The report will usually make a recommendation as to whether Parliament
should support the general principles of the Bill.  The Scottish Government will also
launch the NCS Design School, ahead of the first NCS Gathering.  It does not
appear that details of the NCS Gathering have been published yet.  The Scottish
Government have held a series of events over the summer months to provide
more information about the Bill and how the Bill process works.8 
2.6. MSPs on the Scottish Parliament’s Health, Social Care and Sport Committee, and other
committees, are looking at the details of the proposals, and want to know what people
think about them. Views can be submitted at the following link by 2 September 2022:
National Care Service (Scotland) Bill (Detailed) - Scottish Parliament - Citizen Space 
3. An overview of the NCS Bill
It is important to note that the Bill will be subject to Parliamentary scrutiny and will pass
through various stages before it becomes an Act (ie law).  It is however clear that it is
the intention of the Scottish Government to establish a National Care Service and to
transfer health and social care functions from local authorities to the Scottish Ministers. 
3.1. There are four key Parts of the Bill:
(i) Part 1 establishes the National Care Service and care boards.  It gives
Scottish Ministers the power to transfer health and social care functions to the
boards.  
(ii) Part 2 gives Scottish Minister’s powers over health and social care records
(iii) Part 3 modifies existing laws relating to the provision and regulation of care
(iv) Part 4 allows further legislation and regulations to be made. 
3.2. By far, the most significant part of the legislation is the intention to transfer social care
responsibility from local authorities to a new, national service.  However, the Bill does
not provide any detail as to the logistics of this transfer.  It is not clear at this stage
the extent to which powers will be removed from local authorities or to what extent
local authorities will continue to have involvement in the provision or delivery of
services.  It is however clear that the Bill anticipates the possibility of a wholesale
transfer of powers and duties to NCS. 
3.3. There is also the power for Scottish Ministers to transfer healthcare functions from
the NHS to the National Care Service. 
3.4. As part of the initial consultation process, the Scottish Government had sought views
on transferring duties and responsibilities for children’s services social work and
criminal justice social work into the NCS.  The Scottish Government have set out their
intention to consult further on any proposed transfer.  Section 30 of the Bill requires 
8 National Care Service - Social care - gov.scot (www.gov.scot) (under heading “Register for an event to learn
more about the National Care Service Bill”)
Page 152 of 340

Page 153

the Scottish Government to carry out a further consultation prior to bringing to
Parliament any draft regulations seeking to transfer children’s or justice services. 
3.5. Part 1 deals with practical aspects relating to the Boards, including core principles,
strategic plans, complaints handling and service failures.  There are also provisions
allowing for TUPE transfers of staff and for the transfers of property and liabilities. 
Section 27 of the Bill allows the Scottish Ministers to make regulations to transfers
function from local authorities to either the Scottish Ministers or care boards.  The
functions which can be transferred are set out in Schedule 3 of the Bill (set out as an
Appendix to this document)9 and include the majority of legislation underpinning
social work functions, including the Social Work (Scotland) Act 1968. 
3.6. It is envisaged that there will be two types of care board: a local care board and a
special care board.  Local boards will be responsible for the delivery of care.  A
special care board need not be given a particular geographical area of responsibility,
but may have responsibility to provide certain services throughout all of Scotland. The
Scottish Ministers will have oversight of those boards.  The Scottish Ministers will be
granted powers to make decisions about the membership of care boards. 
3.7. It is proposed that care boards will be bodies corporate.  They will have a separate
legal personality, meaning that ordinarily board members will not be personally liable
for actions taken, or not taken, by the board. 
3.8. The explanatory notes to the Bill outlines that Scottish Ministers will have the power
to completely transfer the function of provision a social care service away from local
authorities.  Where that happens, there will be no clear legal basis for a local
authority to continue providing a service.  In order to allow the NCS to enter into a
contract with the local authority, amendments are proposed to the Local Government
(Scotland) Act 1973 to provide a legal basis to allow local authorities to continue
providing services as a contractor, even where they have no legal duty to do so. 
3.9. Part 2 gives the Scottish Ministers powers by regulations to establish a scheme for
information sharing between the NCS and NHS. 
Part 3 provides rights to breaks for carers and gives effect to ‘Anne’s Law’ allowing
care home residents to see and spend time with people important to them.  It also
provides new procurement regulations which if enacted will allow the list of bidders
for a contract to be limited to those who meet a particular description.  A further
proposed regulations strengthen the powers of the Care Inspectorate. 
Part 4 contains the provisions which allow Scottish Ministers to make regulations as
to the transferring of functions from a local authority to the NCS. 
4. Actions required by the Council 
4.1. At a meeting of CMT on 29th June, it was agreed that relevant Council departments
establish an officer Working Group, in preparation to engage with the NCS Design
School and to continue the existing work with COSLA, SOLACE, SOLAR or other
relevant bodies.  The Working Group will also require to prepare to engage in the 
9 Link to Appendix
Page 153 of 340

Page 154

future consultation on the inclusion of children’s services and criminal justice social
work.  In addition, the Working Group should also consider how to engage with those
impacted by the proposed changes, including those receiving care services, children
social work and care services and criminal justice social work services. 
4.2. Further work will be required in the coming weeks to analyse in more depth the Bill
and supporting documents.  Briefing seminars were provided to elected members in
October 2021 and August 2022, and it may be that further seminars could be offered
once there is further clarity as to the proposals. 
4.3. Work should be undertaken by the Council in due course to engage with relevant
working groups and to ensure that the Council and those to whom it provides a
service’s views are represented to the Scottish Government. 
APPENDIX A – Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Reducing the gap in learning outcomes
Reducing the gap in health outcomes
Reducing the gap in economic circumstances 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable
Page 154 of 340

Page 155

Efficient and Modern 
Innovative and Ambitious 
A.4 Delivering Best Value 
Not applicable at this stage. 
A.5 Involving Communities and Other Stakeholders 
The report did not require any involvement of communities and other
stakeholders. 
A.6 Impact on Performance and Outcomes  
The subject of this report does not impact currently on performance and
outcomes. 
A.7 Adopting a Preventative Approach 
As stated within the Single Midlothian Plan 2020-2021 the Getting it Right for
Every Midlothian Child Board is fully committed to realising the children’s rights
approach to all of our work and making sure that we embed the principles of
the United Nations Conventions on the Rights of the Child. 
A.8 Supporting Sustainable Development 
Report Contacts: 
Alan Turpie 
Suzanne Ross 
Schedule 3 of the NCS Bill 
National Assistance Act 1948 
Matrimonial Proceedings (Children) Act 1958 
Social Work (Scotland) Act 1968 
Children Act 1975 
Local Government and Planning (Scotland) Act 1982, section 24 
Health and Social Services and Social Security Adjudications Act 1983, Part 7 
Page 155 of 340

Page 156

Foster Children (Scotland) Act 1984 
Children (Scotland) Act 1995 
Criminal Procedure (Scotland) Act 1995 
Adults with Incapacity (Scotland) Act 2000 
Mental Health (Care and Treatment) (Scotland) Act 2003 
Management of Offenders etc. (Scotland) Act 2005 
Adoption and Children (Scotland) Act 2007 
Adult Support and Protection (Scotland) Act 2007 
Children’s Hearings (Scotland) Act 2011 
Social Care (Self-directed Support) (Scotland) Act 2013 
Children and Young People (Scotland) Act 2014 
Human Trafficking and Exploitation (Scotland) Act 2015 
Criminal Justice (Scotland) Act 2016 
Carers (Scotland) Act 2016 
Age of Criminal Responsibility (Scotland) Act 2019 
Management of Offenders (Scotland) Act 2019 
Page 156 of 340

Page 157

Midlothian Council
23 August 2022 
Buffer Zones 
Report by Kevin Anderson, Executive Director - Place 
Report for Information 
1 Recommendations 
Council is recommended to: 
i. note the action taken by the Chief Executive following Motion 7.2
to Council on 25 June 2019 and the responses received in
August 2019. 
ii. note that the consultation period for the Safe Access (Abortion
Services) Scotland Bill closed on 11 August 2022 and that a
request for an extension was unfortunately not granted.
iii. note that the mover and seconder of the original motion have
submitted their response as outlined in Appendix 3. 
2 Purpose of Report/Executive Summary 
This report responds to a previous Motion to Council on 25 June 2019
relating to Buffer Zones.  It also highlights the associated Safe Access
(Abortion Services) Scotland Bill consultation which closed on 11
August 2022 and provides information regarding a submission made by
the motion mover and seconder. 
Date: 9 August 2022 
Report Contact:
Myra Forsyth
myra.forsyth@midlothian.gov.uk 
Item 8.9
Page 157 of 340

Page 158

2 
3 Background 
3.1 Motion 7.2 Buffer Zones, presented to Council on 25 June 2019
supported ‘the principle of buffer zones outside NHS Lothian
reproductive health clinics and hospitals, to protect individuals from
obstruction or harassment when accessing vital reproductive health
services and advice’ and asked that the following actions be carried
out:
- Council instructs the Chief Executive to liaise with NHS Lothian &
neighbouring Local Authorities, Police Scotland, COSLA and the
Scottish Government to assess the legal instruments that could be
used to implement such buffer zones within the Lothian Health
Board boundary. 
- Council further instructs the Chief Executive to bring forward a
report to this Council, detailing potential courses of action. 
3.2 In following up the motion the Chief Executive wrote to the Chief
Executive of NHS Lothian, expressing the Council’s concerns as
outlined in the motion. The Chief Executive received responses back in
August 2019 outlining that  Public Space Protection Orders (buffer
zones) are not available in Scotland so the overall decision to ban or
place restrictions on a gathering or protest lies almost exclusively with
Police Scotland. In addition Midlothian do not have any clinics although
Council noted that Midlothian residents do access these services within
the NHS facilities within the City of Edinburgh. 
3.3 The Ministerial-led Working Group on Buffer Zones around healthcare
facilities was formed in 2021 to consider short, medium and long-term
actions that may help to address the issue of protests/vigils that take
place outside of abortion clinics or other facilities providing healthcare. 
3.4 The group brings together representatives of affected Councils and
Health Boards, along with representatives from the Convention of
Scottish Local Authorities (CoSLA), the Society of Local Authority
Lawyers and Administrators (SOLAR) and Police Scotland. 
3.5 On 19 May 2022 the proposed Abortion Services Safe Access Zones
(Scotland) Bill was presented to the Scottish Parliament and the Safe
Access (Abortion Services) Scotland Bill consultation launched. The
consultation closed on Thursday 11 August 2022. 
3.6 In referencing the current Safe Access (Abortion Services) Scotland Bill
consultation, members are asked to note the submission made by the
motion mover and seconder shown in section titled ‘Your views on the
proposals’ in Appendix C. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
Page 158 of 340

Page 159

3 
There are no additional resource implications arising from this report. 
4.2 Digital 
There are no additional digital implications arising from this report. 
4.3 Risk 
There are no additional risks arising from this report. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
There are no direct equalities implications arising from this report. 
4.5 Additional Report Implications (Not applicable given the subject of
the report) 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Background information/Links
Appendix C – Motion Mover and Seconder Submission Sample 
Page 159 of 340

Page 160

4 
APPENDIX B 
Background Papers/Resource Links 
7.2 Motion to Council 25 June 2019 
Safe Access (Abortion Services) Scotland Bill Consultation 
Page 160 of 340

Page 161

APPENDIX C 
Original motion mover and seconder: 
SAFE ACCESS (ABORTION SERVICES) SCOTLAND BILL
CONSULTATION 
Questions 
About you 
(Note: Information entered in this “About You” section may be published with your
response (unless it is “not for publication”), except where indicated in bold.) 
1. Data protection declaration 
I confirm that I have read and understood the Privacy Notice to this
consultation which explains how my personal data will be used. 
2. If you are under 12 and making a submission, we will need to contact you to
ask your parent or guardian to confirm to us that they are happy for you to send
us your views. 
Please ONLY tick this box if you are UNDER 12 years of age.

3. Are you responding as: 
an individual – in which case go to Q4 
on behalf of an organisation? – in which case go to Q5 
4. Which of the following best describes you? (If you are a professional or
academic, but not in a subject relevant to the consultation, please choose
“Member of the public”.) 
Politician (MSP/MP/peer/MEP/Councillor) 
Professional with experience in a relevant subject
Academic with expertise in a relevant subject
Member of the public

Optional: You may wish to explain briefly what expertise or experience you have
that is relevant to the subject-matter of the consultation: 
5. Please select the category which best describes your organisation: 
Public sector body (Scottish/UK Government or agency, local authority,
NDPB) 
Commercial organisation (company, business)
Representative organisation (trade union, professional association) 
Third sector (charitable, campaigning, social enterprise, voluntary, non-profit) 
Other (e.g. clubs, local groups, groups of individuals, etc.)

Page 161 of 340

Page 162

6 
Optional: You may wish to explain briefly what the organisation does, its
experience and expertise in the subject-matter of the consultation, and how the
view expressed in the response was arrived at (e.g. whether it is the view of
particular office-holders or has been approved by the membership as a whole).



6. Please choose one of the following: 
I am content for this response to be published and attributed to me or my
organisation 
I would like this response to be published anonymously
I would like this response to be considered, but not published (“not for
publication”) 
If you have requested anonymity or asked for your response not to be published,
please give a reason. (Note: your reason will not be published.) 
7. Please provide your name or the name of your organisation. (Note: The name
will not be published if you have asked for the response to be anonymous
or “not for publication”.) 
Name: 
8. Please provide a way in which we can contact you if there are queries
regarding your response. Email is preferred but you can also provide a postal
address or phone number. (Note: We will not publish these contact details.) 
Contact details: 
Page 162 of 340

Page 163

7 
Your views on the proposal 
Note: All answers to the questions in this section may be published (unless your
response is “not for publication”). 
9. Which of the following best expresses your view of the proposed Bill? 
Fully supportive
Partially supportive
Neutral (neither support nor oppose)
Partially opposed 
Fully opposed
Unsure
Please elaborate on your response 
We would not oppose the Bill as framed as this would be a reasonable step to
take in ensuring free access to the health services in line with the law. 
10. What is your view of the proposal for safe access zones being introduced at
all healthcare settings that provide abortion services throughout Scotland? 
Fully supportive
Partially supportive
Neutral (neither support nor oppose)
Partially opposed
Fully opposed 
Unsure 
Please explain the reasons for your response. 
We support the principal scope of the Bill being on such health care facilities. 
However, we have also recognised anecdotal evidence that access to other
healthcare and research facilities have taken place with respect to COVID-19
vaccination centres.  In the future science sceptic demonstrations and picketing
might create a hostile environment to people seeking support or going about their
lawful business.  It may be helpful if the Bill can allow secondary legislation to
cover such issues. 
11. What is your view of the proposal for the ‘precautionary’ approach to be used,
in which a safe access zone is implemented outside every site which provides
abortion services? 
Fully supportive
Partially supportive
Neutral (neither support nor oppose) 
Partially opposed  
Fully opposed  
Unsure 
Please explain the reasons for your response. 
Page 163 of 340

Page 164

8 
The only hesitation here is that an absolute ban could be seen as unnecessarily
inhibitive of the right to free speech and not proportionate to the issue where
there has been no historical picketing of this sort.   
12. What is your view of the proposed standard size of a safe access zone being
150 metres around entrances to buildings which provide or house abortion
services? 
Yes – Support this part of the proposal 
No – Believe they should be a different standard size 
No – Believe the size should be decided based on each site
No – Do not support the introduction of safe access zones in any form 
Unsure
Other – please detail below 
Please explain the reasons for your response. 
Again, the reason for hesitation is that a proportionate approach is likely to be site
specific.  However, a standardised baseline for safe access zones might be
helpful, from which local variations take into account local and site specific
circumstances.   
13. What is your view of the proposal to ban all protests including both protests in
support of and those in opposition to: 
A person’s decision to access abortion services (ie a woman having an abortion)? 
Fully supportive 
Partially supportive
Neutral (neither support nor oppose)
Partially opposed
Fully opposed 
Unsure
Please explain the reasons for your response. 
It is important that there should be no interference in the free access to
healthcare facilities by service users, employees of the services or others
associated with either of these.  An exclusion zone for protests would not exclude
the possibility of protests taking place elsewhere in more neutral environments.   
14. What is your view of the proposal to ban all protests including both protests in
support of and those in opposition to: 
A person’s decision to provide abortion services (ie a doctor, nurse, or midwife)? 
Fully supportive 
Partially supportive
Neutral (neither support nor oppose)  
Partially opposed  
Fully opposed 
Unsure 
Please explain the reasons for your response.
Page 164 of 340

Page 165

9 
See 13 above. 
15 What is your view of the proposal to ban all protests including both protests in
support of and those in opposition to: 
A person’s decision to facilitate provision of abortion services (ie administrative or
support staff)? 
Fully supportive
Partially supportive
Neutral (neither support nor oppose) 
Partially opposed
Fully opposed
Unsure
Please explain the reasons for your response. 
See 13 above. 
16. Which types of activity – when done for the purposes of influencing a person’s
decision to access healthcare settings including abortion services - do you
consider should be banned in a safe access zone? (tick as many from the list as
you consider should be covered by the Bill)) 
Persistently, continuously, or repeatedly occupying the zone
Impeding or blocking somebody’s path or an entrance to abortion services 
Intimidating or harassing a person 
Seeking to influence or persuade a person concerning their access to or
employment in connection with abortion services 
Demonstrating using items such as leaflets, posters, and pictures specifically
related to abortion 
Photographing, filming, or recording a person in the zone 
All of the above
None of these 
Other (include details below) 
Similar arguments exist over similar activities that involve obstruction to other
healthcare and research facilities.   
17. What is your view on the potential punishments set out in the proposal for
breach of a safe access zone (see pages 15 to 16 of the consultation document)? 
Fully supportive
Partially supportive 
Neutral (neither support nor oppose) 
Partially opposed
Fully opposed
Unsure

Please give reasons for your response, including commenting on whether this
should be a criminal offence. 
Our view is that the primary purpose of the Bill should be normative and result in
Page 165 of 340

Page 166

10 
people no longer acting in ways that intimidate lawful access to healthcare
facilities either as a service user or for employment and associated advice &
support.  The proposition that single breaches are treated differently from
persistent action seems entirely reasonable.   
18. Do you think there are other ways in which the Bill’s aims could be achieved
more effectively? 
Yes
No
Unsure
Please elaborate on your response if you’d like to: 
Our position is that local decision making informed by local circumstances is
more proportionate in addressing this important matter, and that a legal
framework that facilities this is likely to better for ownership of the matter by and
accountability to local communities.  (Local referring to the service location and
the wider communities and local authorities served) 
Financial implications 
19. Any new law can have a financial impact which would affect individuals,
businesses, the public sector, or others. What financial impact do you think this
proposal could have if it became law? 
a significant increase in costs
some increase in costs
no overall change in costs
some reduction in costs 
a significant reduction in costs 
I don’t know

Please explain the reasons for your answer, including who you would expect to
feel the financial impact of the proposal, and if there are any ways you think the
proposal could be delivered more cost-effectively. 
A concern is that locally informed decision-making, or an approach that requires
locally informed input (which is not proposed in the consultation document) will
incur a cost on those gathering, presenting and deciding on such information. 
Also it is clear the greater the element of local variation and discretion the greater
the chance is that legal challenges could be made.  This is the cost of local
democratic engagement.  The quantum would be dependent on the nature of the
Bill and could end up being in the area that has been cited in the consultation
document. 
Page 166 of 340

Page 167

11 
Equalities 
20. Any new law can have an impact on different individuals in society, for
example as a result of their age, disability, gender re-assignment, marriage and
civil partnership status, pregnancy and maternity, race, religion or belief, sex or
sexual orientation. 
What impact could this proposal have on particular people if it became law? 
Positive
Slightly positive 
Neutral (neither positive nor negative)
Slightly negative 
Negative 
Unsure
Please explain the reasons for your answer and if there are any ways you think
the proposal could avoid negative impacts on particular people. 
Sustainability 
21. Any new law can impact on work to protect and enhance the environment,
achieve a sustainable economy, and create a strong, healthy, and just society for
future generations. Do you think the proposal could impact in any of these areas? 
Yes 
No
Unsure
Please explain the reasons for your answer, including what you think the impact
of the proposal could be, and if there are any ways you think the proposal could
avoid negative impacts? 
General 
22. Do you have any other additional comments or suggestions on the proposed
Bill (which have not already been covered in any of your responses to earlier
questions)? 
Page 167 of 340

Page 168

12 
How to respond to this consultation 
You are invited to respond to this consultation by answering the questions in the
consultation and by adding any other comments that you consider appropriate.  
Format of responses 
If possible, please submit your response electronically preferably through the
survey at this link https://www.smartsurvey.co.uk/s/bufferzonesscotland/.
Alternatively you can submit your response to the email address below in a MS
Word document. Please keep formatting of this document to a minimum. 
Please make clear whether you are responding as an individual (in a personal
capacity) or on behalf of a group or organisation. If you are responding as an
individual, you may wish to explain briefly what relevant expertise or experience
you have. If you are responding on behalf of an organisation, you may wish to
explain briefly what the organisation does, its experience and expertise in the
subject-matter of the consultation, and how the view expressed in the response
was arrived at (e.g. whether it is the view of particular office-holders or has been
approved by the membership as a whole). 
Please include with your response contact details (e-mail if possible, or telephone
or postal address) so we can contact you if there is any query about your
response. 
Where to send responses 
Responses prepared electronically should be sent by e-mail to: 
gillian.mackay.msp@parliament.scot 
Responses prepared in hard copy should be sent by post to: 
Gillian Mackay MSP 
Room MG.15 
Scottish Parliament 
Edinburgh EH99 1SP 
You may also contact Gillian Mackay’s office by telephone on (0131) 348 6341. 
Deadline for responses 
All responses should be received no later than 11:59pm on Thursday 11
August 2022. Please let me know in advance of this deadline if you anticipate
difficulties meeting it. 
How to respond to this consultation 
You are invited to respond to this consultation by answering the questions in the
consultation and by adding any other comments that you consider appropriate.  
Page 168 of 340

Page 169

13 
Format of responses 
If possible, please submit your response electronically preferably through the
survey at this link https://www.smartsurvey.co.uk/s/bufferzonesscotland/.
Alternatively you can submit your response to the email address below in a MS
Word document. Please keep formatting of this document to a minimum. 
Please make clear whether you are responding as an individual (in a personal
capacity) or on behalf of a group or organisation. If you are responding as an
individual, you may wish to explain briefly what relevant expertise or experience
you have. If you are responding on behalf of an organisation, you may wish to
explain briefly what the organisation does, its experience and expertise in the
subject-matter of the consultation, and how the view expressed in the response
was arrived at (e.g. whether it is the view of particular office-holders or has been
approved by the membership as a whole). 
Please include with your response contact details (e-mail if possible, or telephone
or postal address) so we can contact you if there is any query about your
response. 
Where to send responses 
Responses prepared electronically should be sent by e-mail to: 
gillian.mackay.msp@parliament.scot 
Responses prepared in hard copy should be sent by post to: 
Gillian Mackay MSP 
Room MG.15 
Scottish Parliament 
Edinburgh EH99 1SP 
You may also contact Gillian Mackay’s office by telephone on (0131) 348 6341. 
Deadline for responses 
All responses should be received no later than 11:59pm on Thursday 11
August 2022. Please let me know in advance of this deadline if you anticipate
difficulties meeting it. 
Page 169 of 340

Page 170

Page 170 of 340

Page 171

Midlothian Council
23 August 2022 
Appointment of Members in Accordance with the Scheme of
Administration – Scottish Joint Council 
Report by Kevin Anderson, Executive Director, Place 
Report for Decision 
1 Recommendation
The Council is invited to consider the appointment of an elected
member to the Scottish Joint Council as COSLA is seeking 
nominations from all 32 local authorities. 
2 Purpose of Report/Executive Summary 
In accordance with Standing Order 4.1 (x) consideration requires to be
given by Council to the appointment of representatives to Joint
Committees, Outside Bodies and other partnership working. 
Date:  23 August 2022
Report Contact:  Kevin Anderson, Executive Director Place
Email:  Kevin.Anderson@midlothian.gov.uk 
Item 8.10
Page 171 of 340

Page 172

2 
3 Main report
The Scottish Joint Council (SJC) represents Councils’ in Scotland and
their employees (other than those for whom other national negotiating
machinery exists). It is committed to the local democratic control of
services to the community as the primary role of local government. Its
principal role is to reach agreement, based on shared values on a
national scheme of pay and conditions for local application in Scotland.
The Scottish Joint Council’s guiding principles are to support and
encourage:
• high quality services delivered by a well-trained, motivated
workforce with security of employment. It encourages training
and development opportunities for employees;
• equal opportunities in employment; equality as a core principle
which underpins service delivery and employment relations; and
the removal of all discrimination and promotion of positive
measures, including positive action when judged to be justified
and effective;
• a flexible approach to providing services to the communities
while meeting the needs of employees as well as employers;
and
• stable industrial relations, negotiation and consultation between
councils as employers and recognised trade unions.
Midlothian Council is asked by COSLA to appoint an elected member
to the SJC.
This reports asks Council to consider the appointment of one member.
4. Report Implications (Resource, Digital and Risk)
4.1 Resource
None
4.2 Digital 
There are no digital implications related to this report.
4.3 Risk
In accordance with Standing Order 4.1(x), this report invites the Council
to appoint Members to Joint Committees and Outside Bodies etc.
Any delay in making the necessary appointments could impede the
discharge of business affecting both these bodies and the Council.
4.4 Ensuring Equalities 
An equalities impact assessment has not been required in connection
with this report. 
Page 172 of 340

Page 173

3
4.5 Additional Report Implications 
See Appendix A 
Page 173 of 340

Page 174

4
Appendix A - Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
There are no direct implications related to this report. 
A.5 Involving Communities and Other Stakeholders 
The report does not directly relate to involving communities. 
A.6 Impact on Performance and Outcomes   
Not applicable 
A.7 Adopting a Preventative Approach 
Not applicable 
A.8 Supporting a Sustainable Development 
Not applicable
Page 174 of 340

Page 175

Midlothian Council
23 August 2022 
Appointment of Members in Accordance with the Scheme of
Administration – Scotland Excel Joint Committee (substitute member) 
Report by Kevin Anderson, Executive Director, Place 
Report for Decision 
1 Recommendation
The Council is invited to consider the appointment of a named
substitute member to the Scotland Excel Joint Committee. 
2 Purpose of Report/Executive Summary 
In accordance with Standing Order 4.1 (x) consideration requires to be
given by Council to the appointment of representatives to Joint
Committees, Outside Bodies and other partnership working. 
Date:  23 August 2022
Report Contact:  Kevin Anderson, Executive Director Place
Email:  Kevin.Anderson@midlothian.gov.uk 
Item 8.11
Page 175 of 340

Page 176

2 
3 Main report
Scotland Excel is governed by a joint committee and was formed under
section 57 of the Local Government (Scotland) Act 1973 to carry out a
range of procurement functions on behalf of councils and associate
members.
The Joint Committee is made up of one or more elected members from
each of Scotland’s local authorities. It meets twice each year to
scrutinise the performance and activities of Scotland Excel and is
responsible for approving the annual budget and operating plan.
Midlothian Council is asked by Scotland Excel to appoint two elected
members to the Joint Committee – one member and one substitute
member. 
At its meeting of 17 May 2022, Council agreed the appointment of
Councillor Douglas Bowen to the Joint Committee. If the appointee is
unable to attend a meeting, a substitute cannot attend unless formally
appointed at Council. 
This reports asks Council to consider the appointment of a named
substitute member. 
4. Report Implications (Resource, Digital and Risk)
4.1 Resource
None
4.2 Digital 
There are no digital implications related to this report.
4.3 Risk
In accordance with Standing Order 4.1(x), this report invites the Council
to appoint Members to Joint Committees and Outside Bodies etc.
Any delay in making the necessary appointments could impede the
discharge of business affecting both these bodies and the Council.
4.4 Ensuring Equalities 
An equalities impact assessment has not been required in connection
with this report.
4.5 Additional Report Implications 
See Appendix A 
Page 176 of 340

Page 177

3
Appendix A - Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
There are no direct implications related to this report. 
A.5 Involving Communities and Other Stakeholders 
The report does not directly relate to involving communities. 
A.6 Impact on Performance and Outcomes   
Not applicable 
A.7 Adopting a Preventative Approach 
Not applicable 
A.8 Supporting a Sustainable Development 
Not applicable
Page 177 of 340

Page 178

Page 178 of 340

Page 179

Midlothian Council
23 August 2023 
Wheelchair Accessible Housing Targets 
Report by Kevin Anderson, Executive Director - Place 
Report for Decision 
1 Recommendations 
It is recommended that Council; 
i. notes the findings of this report, and 
ii. approves the proposed wheelchair accessible housing targets,
which are to be integrated into the next Local Development Plan
for Midlothian. 
2 Purpose of Report/Executive Summary 
This report summarises the key points of ‘Midlothian’s Wheelchair
Accessible Housing Target’ which details the consultation and
feedback which have enabled the target proposal. 
Midlothian’s wheelchair accessible targets will determine the number of
wheelchair accessible homes which will be built during the course of
the next five years in both social and market developments. 
The proposal is to set a wheelchair accessible housing target of 20 per
annum for the next five years; 10 will be social housing delivered by
Midlothian Council/RSL partners and 10 should be provided by private
sector developers. 
Date 23 August 2022 
Report Contact:
Name Fiona Clandillon 
Tel No 0131 271 3102
fiona.clandillon@midlothian.gov.uk 
Item 8.12
Page 179 of 340

Page 180

2 
3 Background/Main Body of Report 
3.1 All Scottish Local Authorities are required to set wheelchair accessible
housing targets in accordance with the Strategic Housing Investment
Plan (SHIP) Guidance 2021. 
3.2 Setting wheelchair accessible housing targets in Midlothian is a
required action as referenced in the previously council approved
Midlothian Local Housing Strategy 2021-2026. 
3.3 Local authorities can choose to have a single target, setting out the
requirement for housing across all tenures or can distinguish
requirements by tenure and / or sub area where this can be evidenced.
The target(s) can be expressed as a number to be delivered over a
period of time or as a % requirement of either the existing provision or
as a % of all new housing provision within the area. 
3.4 The provision of targets to support the delivery of Wheelchair
Accessible homes means homes suitable for wheelchair users to live in
and should, as a minimum, comply with the design criteria indicated as
a ‘basic’ requirement for wheelchair users, as outlined in Housing for
Varying Needs (HfVN) (column ‘B’ in ‘Summary of Design Criteria’). 
3.5 The public consultation was carried out between Monday 28 February
and Friday 25 March 2022. Midlothian residents were asked to
complete an online survey and, if interested, attend online Microsoft
Teams or Zoom discussion sessions. Paper copies were available to
those who requested them and were made available in libraries and
leisure centres. 105 residents completed the online survey and four
residents attended the discussion sessions. 
3.6 Setting a wheelchair accessible housing target of 20 per annum for the
next five years would be a realistic target to address current and
potential future shortfalls in the provision of wheelchair accessible
homes. It is suggested that 10 will be social housing delivered by
Midlothian Council/RSL partners and 10 should be provided by private
sector developers. 
3.7 In order to address constraints within the private sector the wheelchair
accessible housing target will be set over the five year period and
therefore 100 homes will be built between 2022/23 and 2027/28. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
There are no additional resource implications arising from this report. 
4.2 Digital 
None.
Page 180 of 340

Page 181

3 
4.3 Risk 
If the Council does not support the setting of wheelchair accessible
housing targets, there will be negative consequences for wheelchair
users in Midlothian. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
Equality is central to all housing provision and housing services
delivery. An Integrated Impact Assessment (IIA) was undertaken on the
Local Housing Strategy 2021-26 to ensure that the needs of local
communities have been fully considered. The Wheelchair Accessible
Housing Report reflects identified needs and draws on findings from
the IIA when considering the implications flowing from the translation of
strategic aims into housing policies. 
4.5 Additional Report Implications 
See Appendix A 
Appendices
Appendix A – Additional Report Implications
Appendix B – Wheelchair Accessible Housing Targets 
Page 181 of 340

Page 182

4 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Provision of increased affordable and privately developed wheelchair
accessible housing will improve the quality of life for citizens and
reduce the gap in health outcomes. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The wheelchair accessible housing targets will result in homes which
will deliver cost-effectivity, quality, sustainability and accessibility to
meet both current and future customers’ requirements. 
A.5 Involving Communities and Other Stakeholders 
The wheelchair Accessible Housing Target survey was advertised via
social media, the Scottish Housing News website, libraries, leisure
centres and Health and Social Care Partnership sources. 
Consultation was undertaken in accordance with Scottish Government
guidance including with the Scottish Government’s More Homes
Division, Housing Associations and the Midlothian Health and Social
Care Partnership. 
A.6 Impact on Performance and Outcomes 
Page 182 of 340

Page 183

5 
The setting of wheelchair accessible housing targets supports the
outcomes set out in the Local Housing Strategy 2021-26. 
A.7 Adopting a Preventative Approach 
Setting wheelchair accessible housing targets will ensure the provision
of suitable housing which will reduce hospital discharge times, housing
adaptations and the financial resources required to provide more
expensive care home type accommodation. 
A.8 Supporting Sustainable Development 
Good practice in relation to energy efficiency and sustainability is
highlighted in the Local Housing Strategy and SHIP. 
Page 183 of 340

Page 184

Page 184 of 340

Page 185

Midlothian Council
Wheelchair Accessible Housing Targets 
Item 8.12
Page 185 of 340

Page 186

Background information
In March 2019, the Scottish Government
issued a Guidance Note to Local
Authorities on setting targets to support
the delivery of wheelchair accessible
housing. This Guidance Note1 follows on
from the action set out in the “A Fairer
Scotland for Disabled People”2 delivery
plan:
“To work with local authorities, disabled
people and other stakeholders to ensure
that each local authority sets a realistic
target within its LHS for the delivery of
wheelchair accessible housing across all
tenures and report annually on progress”.
It is a required action of the Midlothian
Local Housing Strategy 2021-20263.
The definition of ‘wheelchair accessible
housing’ is contained within guidance note
MHDGN 201902:
‘the provision of targets to support the
delivery of Wheelchair Accessible homes
across all tenures means homes suitable
for wheelchair users to live in and should
as a minimum comply with the design
criteria indicated as a ‘basic’ requirement
for wheelchair users, as outlined in
Housing for Varying Needs (HfVN)
(column ‘B’ in ‘Summary of Design
Criteria’). as a minimum comply with the
design criteria indicated as a ‘basic’
requirement for wheelchair users, as
outlined in Housing for Varying Needs
(HfVN) (column ‘B’ in ‘Summary of Desi 
1 Wheelchair accessible housing target:
guidance note: MHDGN 201902 - gov.scot
(www.gov.scot) 
2 https://www.gov.scot/publications/fairer-
scotland-disabled-people-delivery-plan-2021-
united-nations-convention/   
Local authorities can choose to have a
single target, setting out the requirement
for housing across all tenures or can
distinguish requirements by tenure and /
or sub area where this can be evidenced.
The target(s) can be expressed as a
number to be delivered over a period of
time or as a percentage requirement of
either the existing provision or as a
percentage of all new housing provision
within the area. 
3 Housing strategy and performance |
Midlothian Local Housing Strategy 2021-
2026 
Page 186 of 340

Page 187

Contents 
1. Current Provision     p4 
2. Midlothian Local Development Plan   p9 
3. Unmet need      p9 
4. Consultation      p10 
5. Consultation results     p10 
6. Online chats      p20 
7. Setting a Wheelchair Accessible Housing Target p20 
Page 187 of 340

Page 188

4 
1 Current Provision 
1.1 Midlothian’s Strategic Housing Investment Plan (SHIP) is an important document
which sets out the strategic investment priorities for housing over a 5 year period,
specifically affordable housing.  The SHIP is updated annually with details of planned
social housing new build sites. The most recent SHIP (2022/23-2026/27) highlights
that there are currently 115 wheelchair accessible housing units either planned or in
the process of being built between 2022 and 2027. 
1.2 Table 1.1 below, shows existing Midlothian Council, Housing Association and charity
organisation wheelchair accessible housing (in black) and planned/underway housing
(in red)4. 
1.3 The table illustrates that by the end of 2027, 66% of wheelchair accessible housing
will have one bedroom, 20% will have two bedrooms, 6% will have three bedrooms
and there will be 4% and 2% with four bedrooms and five or more bedrooms
respectively. Furthermore, 76% (215) of wheelchair accessible social housing will be
provided by Midlothian Council, 22% (61) will be Housing Association properties and
the remaining 2% will be provided by charity organisations. 
1.4 The highest number of wheelchair accessible homes will be in the Dalkeith area (68)
followed by Bonnyrigg (65), Penicuik (45), Newtongrange (22) and Mayfield will have
20. 
4 As of May 2022
Page 188 of 340

Page 189

5 
Table 1.1: Current and planned wheelchair accessible social housing in Midlothian 
Area  1 Bed 2 Bed 3 Bed 4 Bed 5 Bed Total by Area
Bilston  4 flats (Melville HA,
unknown bedroom
numbers, due 2026/27) 
1 (Melville HA)   
2022 = 1
2027 = 5 
Bonnyrigg
8 (Chesters View,
Midlothian Council) 
1 (Castle Rock Edinvar HA) 
39 (Midlothian Council,
extra care flats due 2024) 
1 (Midlothian Council,
supported flats due 2023)
6 (Chesters View,
Midlothian Council) 
1 (Castle Rock
Edinvar HA) 
7 (Midlothian Council, extra
care flats due 2024)
1 (Burnbrae Road,
Midlothian Council) 
1 (Castle Rock Edinvar
HA)    2022= 18
2024 = 65 
Dalkeith
2 (Esk Place, Midlothian
Council) 
5 (Castle Rock Edinvar HA) 
1 (Crystalmount retirement
housing, Castle Rock
Edinvar HA) 
40 (Midlothian Council,
extra care flats, due
February 2023) 
2 (Railway Cottages,
Viewpoint HA) 
5 (Castle Rock Edinvar HA) 
8 (Midlothian Council, extra
care bungalows, due
February 2023) 
1 (Salter’s Road,
Midlothian Council)
3 (1 x Salter’s
Road, 1 x Bill
Russell Grove,
Midlothian
Council & 1 x
Melville HA) 
1 (Thera Trust)   
2022 = 20
2023 = 68 
Page 189 of 340

Page 190

6 
Area  1 Bed 2 Bed 3 Bed 4 Bed 5 Bed Total by Area 
Danderhall 
5 (Angres Court, Midlothian
Council) 
2 (Angres Court, Midlothian
Council)     
2022 = 7 
Easthouses 
9 (Easthouses Court,
Midlothian Council) 
3 (Easthouses Court,
Midlothian Council)     
2022= 12 
Gorebridge 
1 (Castle Rock Edinvar HA) 
10 (Midlothian Council,
extra care bungalows, due
2023/24)
2 (Midlothian Council, extra
care bungalows, due
2023/24)
1 (Robert Franks
Avenue, Midlothian
Council)
1 (Robert Franks
Gardens,
Midlothian
Council)  
2022 = 3
2024 = 15
Loanhead 1 (Hawthorn Gardens
intermediate care, Trust
HA) 
1 (Castle Rock Edinvar HA) 
12 (Canmore Court,
amenity housing,
Midlothian Council) 
2 (Edgefield Court,
Midlothian Council) 
1 (Melville HA)
1 (Academy
Court, Midlothian
Council)   
2022= 18 
Mayfield  1 (Salisbury View,
retirement housing, Castle
Rock Edinvar HA) 
2 (Castle Rock Edinvar HA)
1 (Salisbury View,
retirement housing, Castle
Rock Edinvar HA) 
3 (Melville HA) 
1 (Thera Trust) 
1 (Westhouses Road,
Midlothian Council) 
2 (Melville HA) 
1 (Castle Rock Edinvar
HA) 
2 (Melville HA
bungalows,  unknown
bedroom numbers,
due 2024/25)
3 (Melville HA) 
1 (Blackcot Road,
Midlothian
Council)
2 (Melville
HA) 
2022= 18
2025= 20
Page 190 of 340

Page 191

7 
Area  1 Bed 2 Bed 3 Bed 4 Bed 5 Bed Total by Area
Newtongrange  7 (Deanpark Court,
Midlothian Council) 
1 (St Anne’s retirement
housing, Castle Rock
Edinvar HA) 
3 (Castle Rock Edinvar HA)
2 (Deanpark Court,
Midlothian Council) 
4 (Castle Rock Edinvar HA) 
2 (Thera Trust)
1 (Redwoods Caring
Foundation) 
1 (Midlothian Council,
due 2022) 
1 (Redwoods
Caring
Foundation)  2022 = 21 
End of 2022 = 22 
Pathhead  2 (Castle Rock Edinvar HA)      2022 = 2
Penicuik  28 (Cowan Court extra care
flats, Midlothian Council) 
1 (retirement housing,
Castle Rock Edinvar HA) 
2 (Teviot Court complex
care housing, Midlothian
Council) 
2 (Castle Rock Edinvar HA)
4 (Vaucluse Place,
Blackwood Homes) 
4 (Cowan Court extra care
flats, Midlothian Council)
1 (Pavilion Court,
Midlothian Council)
1 (Eastfield Farm
Road, Midlothian
Council)
2 (Pentland
Way,
Midlothian
Council) 
2022=45 
Poltonhall  1 (Andy Kelly View,
Midlothian Council) 
1 (Melville HA) 
1 (Royal
Scots
Medway,
Midlothian
Council) 
2022= 3 
Rosewell   1 (Melville HA
bungalow, unknown
no. of bedrooms, due
2024/25) 
1 (Thera
Trust)
2022 = 1 
2025 = 2
Roslin 1 (Ross Glen Court
retirement housing, Castle
Rock Edinvar HA)      2022= 1 
Page 191 of 340

Page 192

8 
Area  1 Bed 2 Bed 3 Bed 4 Bed 5 Bed Total by Area
Total by Property Size  2022= 96
End of 2022 = 136
End of SHIP period (2027)
= 186
2022 = 40
End of 2022 = 48
End of SHIP period (2027)
= 57 
2022 = 15
End of 2022 = 16
End of SHIP period
(2027) = 16
2022= 12
End of SHIP
period (2027) =
12
2022 = 7
End of SHIP
period
(2027) = 7 
Total no. of
properties 
2022= 170
End of 2022 =
258
End of SHIP
period (2027) =
283 
(7 properties do
not have a
confirmed no. of
bedrooms) 
Page 192 of 340

Page 193

9 
2. Midlothian Local Development Plan 
2.1 The current Midlothian Local Development Plan5 (2017) sets an affordable housing
requirement.  In principle, the Council will consider provision of specialist housing as
contributing towards the affordable housing requirement (paragraph 3.2.5).  
2.2 Midlothian Council is preparing a new local development plan for Midlothian. It is
expected to be in place by 2026.  The Council will develop the approach of the
adopted plan, so that the affordable housing policy is sufficiently detailed and specific
to support delivery of the wheelchair accessible housing targets.
3. Unmet need 
3.1 Midlothian Council’s Occupational Therapy Service work with adults, older people
and children who have a physical, mental or learning disability, are frail or unable to
manage activities of daily living, and their carers. The service helps people to remain
independent in the community which may be required on a temporary basis or as a
more permanent solution to long-standing difficulties. The type of help provided
ranges from simple requests for information, equipment, minor adaptations to more
major adaptations. The service works with people regardless of tenure type e.g.
owner occupiers, Midlothian Council tenants etc. Chart 3.1 below, illustrates the
current tenure of Occupational Therapy Service clients who require the use of a
wheelchair and who are inappropriately housed. It should be noted that the clients
live in towns and villages across the Midlothian area. 
Chart 3.1: Known unmet housing need by current tenure type 
3.2 It is clear from chart 3.1 that properties of different sizes and tenures are required
across Midlothian. 
5 The current development plan for Midlothian | Development plans and policies | Midlothian
Council
Owner occupiers (8 clients) Midlothian Council tenants (8 clients)
Housing Association tenants (1 client) Private tenants (1 client)
Page 193 of 340

Page 194

10 
3.3 It should be noted that these findings are limited given low client numbers and the
knowledge that many wheelchair users in Midlothian don’t require the Occupational
Therapy Service and their needs are therefore unknown. The results of the
wheelchair accessible housing consultation, below, contains further information on
current need. 
4. Consultation 
4.1 Our public consultation was carried out between Monday 28 February and Friday 25
March 2022. Midlothian residents were asked to complete an online survey and if
interested, attend online Microsoft Teams or Zoom discussion sessions. Paper
copies were available to those who requested them and were made available in
libraries and leisure centres. 
4.2 105 residents completed the online survey and four residents attended the
discussion sessions. 
5. Consultation results 
Profile of Respondents 
Residents were asked for their current postcode. 30% of respondents were from the
Bonnyrigg/Lasswade area, 29% were from the Dalkeith area, 11% were from the Penicuik
area and 10% were from the Gorebridge area. The remaining 21% of responses is
comprised of small numbers of residents from Lasswade, Loanhead, Rosewell and Roslin.
Two responses were from out with Midlothian. 
Discussion sessions were held on:
• Tuesday 22 February 2022, 10am-11am
• Wednesday 23 February 2022, 12:30pm-13:30pm
• Thursday 24 February 2022, 11am-12noon
• Monday 28 February 2022, 10am-11am
• Wednesday 2 March 2022, 12:30pm-13:30pm
•
Page 194 of 340

Page 195

11 
In terms of their current house type, the majority (67%) stated they lived in houses. Just 13%
stay in flats and single storey/bungalows respectively and 7% live in four in a block
properties. 
Table 5.1
Current house type No. of responses
House 70
Flat 14
Single storey/bungalow 14
Four in a block 7
Other 0 
In addition, 49% of respondents were owner occupiers, 29%
were Midlothian Council tenants, 18% were Housing
Association tenants, 4% were private sector tenants and 1%
were living with parents. 
Chart 5.1 Current tenure 
0
10
20
30
40
50
60
Midlothian Council
tenant
Housing
Association tenant
Owner occupier Private tenant Other
What is your current tenure?
Figure 1: Midlothian Council housing in Dalkeith
Page 195 of 340

Page 196

12 
Finally, residents were asked for their current age. 32% were 65 years old and above, 29%
were aged between 55 and 64, 17% were aged between 35 and 44, 16% were aged
between 45 and 54, 6% were aged between 25 and 34 and 1% were aged between 18 and
24 years old. No respondents were under 18 years old. 
Chart 5.2: Current age 
Accessibility of Housing 
Residents were asked if they, or anyone living with them, currently require the use of a
wheelchair. The responses were split evenly with 50% answering yes and 50% answering
no. 
In relation to the accessibility of their current home, 48% of respondents answered that their
homes are partly accessible, 39% reported that their homes are very accessible and 14%
stated that their homes are not accessible. 
0
5
10
15
20
25
30
35
Under 18 18-24 25-34 35-44 45-54 55-64 65+
What is your current age?
Page 196 of 340

Page 197

13 
Chart 5.3: Current home accessible 
Residents were asked whether there is anything in their current homes which limits their
household’s day to day activities. Respondents were able to choose multiple answers. Out of
the 97 responses received the most common issues were steps outside of home (24%), the
design/layout of their homes (11%), internal steps (10%), difficult to access bath/shower
(9%) and 8% reported that their doors are too narrow. Of the remaining restrictions, between
5% and 2% of respondents reported issues with them. 
Table 5.2: Is there anything about your current home which limits your household’s day to
day activities?
Restriction No. of responses
Steps inside of home  10
Steps outside of home  23
Restricted movement due to design/layout
of home
11
Doors too narrow 8
Rooms too small 5
Bath/shower difficult to access/use 9
Toilet difficult to access/use 4
Electric lights/sockets are difficult to reach 2
Heating controls are difficult to reach 3
Can't open windows 2
Difficulty answering door 3
Kitchen cupboards/shelves are difficult to
reach 
5
Cooker hob/oven is difficult to reach 4
Can't access garden 2
Can't use garden due to its layout 4
0
10
20
30
40
50
60
Very accessible Partly accessible Not accessible
Is your home currently accessible for everyone in your household?
Page 197 of 340

Page 198

14 
Can't access local amenities (public
transport/GP/shops etc.)
2
Residents were asked whether someone using
a wheelchair could visit their home (access the
property and move around without difficulty).
67% of respondents reported that this wouldn’t
be possible whereas 33% believe a wheelchair
user could visit and access their properties
without difficulty. 
Residents were asked whether their homes had been adapted to make it accessible for their
household. 51% of households have not had adaptations carried out, 35% reported that their
homes have been partly adapted and 14% have had adaptations carried out which have
made their homes accessible. 
Table 5.3: Has your home been adapted to make it more accessible for you/your household?
Have adaptations been carried out? No. of responses
Yes 14
Yes – partly 34
No 50
Page 198 of 340

Page 199

15 
Residents were asked how many bedrooms their current home has. 35% of respondents
have 2 bedroom and 3 bedroom properties respectively, 15% have 4 bedrooms, 11% have
one bedroom and the remaining 3% have 5 bedrooms or more.
Table 5.4
No. of bedrooms No. of responses
1 12
2 37
3 37
4 16
5+ 3 
The majority of respondents (75%) reported that the number of bedrooms is right for their
household, with 14% stating they have too few bedrooms and the remaining 11% reported
having too many bedrooms. 
One respondent highlighted that the number of bedrooms was sufficient unless a full time
carer was needed. Another stated that their third bedroom was needed for the storage of
their disabled son’s equipment. 
Sample of adaptations detailed in comments: 
‘When my daughter who had a stroke lived with us we had down stair shower and toilet put in as
she could not get in out of bath’
‘I had a ramp installed myself and have had to build an extension’ 
‘Stair lift, wet room, ramp’
‘Stair lift inside. Shower chair. Outside graded steps but no good for wheelchair’
‘Extra railing on the stairs, shower’
‘Bathroom has been adapted’
‘Widening of some doorways and wet room installed’
‘Walk in shower’ 
‘Internal doors - have had the lower threshold lowered’
‘Ground floor bedroom, wet room’
‘High sockets. Partial walk in shower’ 
‘Stair lift, toilet frames and shower stool, perching stool, hand rail outside’ 
Page 199 of 340

Page 200

16 
Future Housing Needs 
Residents were asked whether they knew of any changes to their mobility which would
require the use of a wheelchair in the future. 61% do not know of any changes whereas 39%
are aware that they will require the use of a wheelchair in the future. Comments highlighted
a number of respondents with degenerative conditions such as MS and auto immune
illnesses which made future wheelchair use a possibility. 
Table 5.5
Do you know of any changes to your
mobility which will require the use of a
wheelchair in the future?
No. of responses
Yes 37
No 58 
Residents were asked when considering their future housing
needs, which area of Midlothian they would choose to stay in.
25% of respondents would choose to stay in Bonnyrigg in the
future, 15% would choose Dalkeith, 12% would choose
Penicuik and 11% would like to stay in Gorebridge. Of the
remaining areas, between 8% and 1% would opt to live in
them. 
It is of note that 30% of respondents were from the
Bonnyrigg/Lasswade area and 29% were from Dalkeith which
shows that small numbers of residents would choose to live
elsewhere if given the option. The statistics show support for
small numbers of wheelchair accessible homes in the smaller
villages and towns and larger numbers of wheelchair accessible housing in the larger towns
such as Bonnyrigg, Dalkeith, Penicuik and Gorebridge. 
Chart 5.4 
0
5
10
15
20
25
30
Thinking about your future housing needs, where would
your household like to live?
Figure 2: Midlothian Council housing in Bonnyrigg
Page 200 of 340

Page 201

17 
Respondents were asked to consider their future housing needs and choose their preferred
tenure (and rank their choices in order of first choice, second choice etc.). When considering
the first choice findings 52% of respondents would opt for home ownership, 29% would
choose to be Midlothian Council tenants, 17% would choose to be housing association
tenants and just 2% would like to be private sector tenants. As a second choice 52% would
choose to be housing association tenants, 38% would choose to be Midlothian Council
tenants with very small numbers opting for owner occupancy and private rented tenancies. 
It is of note that these statistics, when viewed in context with the current home tenure details
earlier, show that very few people wish to change their tenure in the future and that
approximately half of all requirements will emerge from owner occupiers. 
Chart 5.5 
In their comments, respondents stated that the reasons for this were a mix of financial
(cannot afford to buy a home or cannot access a mortgage) and security (wishing for
security of tenure; the need for adaptations and repairs to their homes) 
0
10
20
30
40
50
60
Midlothian Council Housing Association
tenant
Owner occupier Private tenant
First choice Second choice Third choice Fourth choice
‘I am happy being a tenant with
Bield Housing. Main reason feeling
safe and secure in my building. No
worries about repairs etc.
Everything I need is here for me’
‘For security of tenancy. I am
terrified my private landlord will sell
this property and I will be homeless’ 
‘I like to have my own home and
know that I am paying my
mortgage in order that I will one
day own the property to help
support my daughter when she is
older’
‘Security though ongoing repair and
maintenance is an issue - care and
repair service in Midlothian would
be a help’
Page 201 of 340

Page 202

18 
Residents were asked to consider their future housing needs and choose their preferred type
of home (and rank in order of first choice, second choice etc.). 59% of respondents chose a
single storey/bungalow as their first choice, 35% chose a house, 4% chose a ground floor
four in a block/cottage flat, 2% chose a ground floor flat and no-one chose an upper flat (with
lift access). As a second choice 38% would choose a house, 31% would choose a single
storey/bungalow, 14% chose ground floor flats and ground floor four in a block/cottage flats
and 3% chose an upper flat. 
It is significant to note that whilst 81% of respondents currently live in either houses or single
storey/bungalows; 94% of respondents would choose to live in these property types in the
future. 
Chart 5.6 
0
10
20
30
40
50
60
House Ground floor flat Single
storey/bungalow
Ground floor four in
a block/cottage flat
Upper flat (with lift
access)
Preferred property type
1st choice 2nd choice 3rd choice 4th choice 5th choice
‘‘I would prefer to stay where I currently live
and have the ramp I need for access. It's been
a long time now since applying for help with a
grant - too long. I haven't been able to leave my
home for a fortnight due to my husband's ill
health to put the portable ramp down for me. As
it is, it isn't even one I could drive my chair
down. This needs improving in the length of
time it takes to obtain help’
‘I’m not fit to take care of any
adjustments needed for my house’ 
“I would much prefer to stay in my
own home and if need be have
things adapted in order I can
remain.”
‘We would love to have the opportunity to buy
our home as it is designed for a wheelchair user.
However if the wheelchair user passed away I
would need to move out. Lack of suitable
affordable housing for disabled people means
lack of opportunity’ 
Page 202 of 340

Page 203

19 
Residents were asked if they had any comments they would like to make about wheelchair
accessible housing in Midlothian. The comments contained a mixture of different points
including the importance of wheelchair/equipment storage, parking, the lack of affordable
market homes and the necessity of having wheelchair users on planning committees. 
‘My daughter has a disability and needs a
wheelchair from time to time, she is in a
private let and only went for the house she's
in because she could access the shower on
her own, not for the house or the area’ 
‘Being disabled and owning home - spent
£25,000 to convert for wheelchair. Makes
you think about people who couldn’t afford to
do this and how restricting life in a
wheelchair is’
‘There is not enough / any new build houses
on one storey / new bungalows being built.
Currently, for the size of bungalow my family
need, it is so expensive to buy or the
bungalows need a lot of work done to them as
they are very dated. Please build some new
build bungalows for house owners to buy!’
‘Would like to see new housing by
private builders to build more
bungalows, like how there is
affordable housing. There should
be so many bungalows included
too’
‘Space is needed to store the wheelchair when
not in use’
‘Parking access is vital to any person with a
disability, whether a wheelchair user or not
Please add this to your deliberations’
‘All homes should have doorways wide
enough to accommodate a wheelchair.
Floorplans should be logical where
movement within the home is with ease.
Downstairs WC/bathroom should be
compulsory’
‘Most new built areas have had very little or
no disabled properties available to me,
while there is a demand for larger houses I
can’t move as nowhere is suitable for me’ 
Page 203 of 340

Page 204

20 
6. Online chats 
6.1 Interested residents were asked to join online chat sessions with staff from Housing,
Planning and the Health and Social Care Partnership. The sessions allowed a
greater understanding of the accessibility issues wheelchair users face, informative
discussions around private development restrictions and the opportunity to consider
issues not included in the survey. 
6.2 Four residents attended the sessions and the following points were noted: 
7. Setting a Wheelchair Accessible Housing Target 
7.1 To enhance the supply of wheelchair accessible housing, Midlothian Council can
choose to have a single target, setting out the requirement for housing across all
tenures or can distinguish requirements by tenure and / or sub area. The target(s)
can be expressed as a number to be delivered over a period of time or as a
percentage requirement of either the existing provision or as a percentage of all new
housing provision within the area.
Tenure
7.2 The consultation found that 52% of respondents would choose to buy their own home
whereas 46% would choose social rented housing. 
Sub area
7.3 There is evidence to suggest that wheelchair accessible targets could be set by sub
area. 25% of respondents would choose to live in the Bonnyrigg area with 15%
opting for Dalkeith, 12% wishing to live in Penicuik and 11% opting for Gorebridge.
‘Midlothian Council installed ramps are
hideous and highlight the disability.’ 
‘All new builds should have wide doors so
wheelchair users can visit others. No steps if
possible. Right angle turns (in wheelchairs)
are very difficult. ‘
‘Through floor lifts are expensive and take
up lots of space.’
‘Wheelchair accessible housing should have
flat surfaces everywhere. No carpets as they
make manoeuvring difficult. Ramp inclines can
be steep. You have to think flat, wide doorways
with open spaces.’
‘Priority areas for future housing should be
in areas where the Council knows the
families are’
‘Wherever these houses are built in
Midlothian, there will be a demand.’ 
Page 204 of 340

Page 205

21 
There is also evidence to suggest that small numbers of wheelchair accessible
homes are required in the smaller towns in Midlothian. 
Future need
7.4 The evidence collated found that 50% of respondents (and/or their household
members) currently require the use of a wheelchair and 50% do not. The percentage
of households who know they will require the use of a wheelchair in the future sits at
39%. 
7.5 Table 7.1 below combines the data from respondents who currently require the use
of a wheelchair with those who foresee needing one in the future. Both percentages
and numbers have been provided in order to enable the wheelchair accessible
targets to be set. 
Table 7.1 
No. of respondents % of respondents
Household currently requires the use of a
wheelchair
50 50%
Household is aware of changes to mobility
which will require the use of a wheelchair in
the future
37 39%
Total 87 88% 6 
7.6 The wheelchair accessible housing targets will cover the five year period from
2022/23 – 2027/28. If the targets were restricted to responses received for the
consultation, there is evidence to suggest that building 17 homes per annum over the
next five years would satisfy current and known foreseeable need7. This does not
include the unknown e.g. families moving into Midlothian, life changing accidents,
Midlothian residents who did not take part in the consultation etc. Further evidence
from the consultation suggests that 52% of these should be built by the private
sector.
7.7 Setting a wheelchair accessible housing target of 20 per annum for the next five
years would be a realistic target to address current and potential future shortfalls in
the provision of wheelchair accessible homes. It is suggested that 10 will be social
housing delivered by Midlothian Council/RSL partners and 10 should be provided by
private sector developers. 
7.8 In order to address constraints within the private sector the wheelchair accessible
housing target will be set over the five year period and therefore 100 homes will be
built between 2022/23 and 2027/28. 
7.9 This target will be examined at the end of the 5 year period in order to account for
Midlothian’s growth and ageing population.
7.10 The Midlothian Strategic Housing Investment Plan 2022/23-2026/27 contains details
of 115 social housing units which are either planned or in the process of being built
between 2022 and 2027. 
6 Average total respondent number used (98.5) due to differing respondent numbers and percentages in
questions 5 and 12
7 87 divided by 5
Page 205 of 340

Page 206

22 
7.11 In order to assist with the development of wheelchair accessible homes in the private
sector, Midlothian Council’s Planning Department propose using the second Local
Development Plan to allocate sites and contain policy provision to meet the
Wheelchair Accessible Housing Target. 
7.12 Further governance from the Scottish Government may be required to assist with the
development of wheelchair accessible homes in the private sector.
7.12 It should be noted that there are additional actions Midlothian Council can employ in
order to make best use of existing wheelchair accessible and adapted housing stock
across all tenures. The proposed actions cover adaptations of existing homes,
personal needs assessments, information and advice, education, RSL allocations
and development of an evidence base in order to inform future wheelchair accessible
targets. It is proposed that these actions will be consolidated within the LHS 2021-26
action plan, and will be reported annually to Council as part of the existing LHS
monitoring, implementation, and reporting process.
Page 206 of 340

Page 207

Midlothian Council
23 August 2022 
Rapid Rehousing Transition Plan 2022/23-2024/25 
Report by Derek Oliver, Chief Officer - Place 
Report for Noting 
1 Recommendations 
Council is recommended to note the updated Rapid Rehousing
Transition Plan submitted to the Scottish Government on 4 July 2022. 
2 Purpose of Report/Executive Summary 
This report presents the annual review of Midlothian Council’s Rapid
Rehousing Transition Plan which was submitted to the Scottish
Government on 4 July 2022. 
Date 4 July 2022 
Report Contact:
Name: Matthew McGlone
Tel No:  07785 440 478
matthew.mcglone@midlothian.gov.uk 
Item 8.13
Page 207 of 340

Page 208

2 
3 Background/Main Body of Report 
3.1 The Scottish Government published its Ending Homelessness
Together Action Plan in 2018. The plan sets out how the Scottish
Government, local authorities and partners would implement the
recommendations of the Homeless and Rough Sleeping Action Group.  
3.2 Following the publication of this action plan all Local Authorities were
required to publish a Rapid Rehousing Transition Plan (RRTP) setting
out:
• How they will move to a model of rapid rehousing in no more
than five years
• How homeless demand and any backlog of homeless cases will
be addressed. 
Midlothian Council submitted its first RRTP in December 2018,
following by updated versions in June 2020 and June 2021 (Appendix
C).  
3.3 Local authorities have been supported in the delivery of these plans
through funding provided by the Scottish Government’s Ending
Homeless Together Fund. Between 2018/19 to 2021/22 Midlothian
Council received funding totalling £522,000. A further £121,000 has
been awarded for 2022/23. The Scottish Government has confirmed
further awards will be made for 2023/24. As in previous years the
amount received will be based on the average number of homeless
applications in the previous three years. Funding beyond this time is
yet to be confirmed. 
3.4 Midlothian Councils RRTP sets out a vision towards 2024: 
“An increased number of homeless households will obtain permanent
accommodation, no homeless household will be accommodated in bed
and breakfast accommodation and the average time taken for the
Council to complete its homeless duty will have halved from 105 to 52
weeks”   
The following key actions were identified to support this vision:
• Increase the supply of affordable housing in Midlothian.
• Revise the Council’s Housing Allocation Policy to address the
backlog of homeless households already in temporary
accommodation, and reduce the time taken to house homeless
households in the future.
• Seek alternative models of temporary accommodation to reduce
the need for bed and breakfast accommodation.
• Ensure homeless households are supported to access a wide
range of housing options, including the private rented sector.
• Develop a ‘Housing First’ approach in Midlothian to house
homeless households with complex needs. 
Page 208 of 340

Page 209

3 
The updated RRTP shows how the Council will continue the work
undertaken in previous years to achieve this vision and explains how
we will address the next phase of its approach to transforming services
provided to those in housing need, including continued compliance with
the Homeless Persons (Unsuitable Accommodation) (order) Scotland. 
Within the RRTP, Section 4 provides an update on activities that have
taken place during 2020/21 to help achieve this vision. Section 5 details
the Council’s priorities for 2022/23 to 2023/24. Section 6 sets out the
resources required to effectively deliver these activities. 
3.5 During 2021/22 Midlothian Council continued to make significant  
progress in transforming services provided to those households
experiencing homelessness or threatened with becoming homeless,
building on the foundations established in previous years. 
3.6 Specific achievements include:
• As a result of ending the use of emergency bed and breakfast
accommodation, Midlothian Council was able to achieve
compliance with the revised Unsuitable Accommodation Order
from commencement, and ensured there were no breaches of
the order during 2021/22.
• Significant reduction in the number of households residing in
temporary accommodation for over two years - from 189 on 31
March 2019 to 51 on 31 March 2022.
• Continued use of the revised Housing Allocation Policy
introduced in May 2020. The revised policy increases the
proportion of properties allocated to homeless households and
requiring homeless applicants to maximise their chances of
securing housing by widening their areas of choice and property
types, which has resulted in quicker permanent housing
outcomes.
• 48 households had their temporary accommodation converted to
a Scottish Secure Tenancy during 2021/22, reducing the need
for multiple moves before being permanently housed, allowing
for links established within the local community to be
maintained. All those who have been in accommodation for over
two years have been offered the opportunity to have their
accommodation converted to a permanent tenancy, where
suitable to do so.
• Housing First continued for a second year in Midlothian. 40
homeless applicants, with multiple and complex support needs
have now secured permanent housing through this project since
its launch in July 2020. The 2022 Housing First Check Up is
included with this report (Appendix E). 
As a result of the activities described above the overall number of
open homeless cases in Midlothian has reduced from 1082 on 31
March 2018 to 630 on 31 March 2022. 
Page 209 of 340

Page 210

4
The conversion works to redevelop Jarnac Court in Dalkeith have
been completed and this project now provides good quality temporary
accommodation to 22 households, together with the provision of on-
site support. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
RRTP activities are funding through a combination of; grants provided
by the Scottish Government, reinvesting savings realised by ending the
use of bed and breakfast accommodation, and existing service
budgets. 
4.2 Digital 
None 
4.3 Risk 
The RRTP sets out key actions and priorities to meet legal duties in
respect of homeless households or those who are at risk of, or
threatened with future homelessness. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
The content of the RRTP was considered under the Councils
Integrated Impact Assessment and this is provided as Appendix D. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Background information/Links
Appendix C – Rapid Rehousing Transition Plan 2022/23 – 2023/24
Appendix D – Integrated Impact Assessment
Appendix E – Housing First Annual Check Up 2022 
Page 210 of 340

Page 211

5
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Preventing homelessness, or where this is not possible providing good
quality temporary accommodation and reducing the time taken for
people to be permanently housed improves the quality of life for
households concerned, leading to sustainable communities and
reducing the gap in health outcomes. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
Key actions included in the RRTP reduce the financial burden on the
Council in respect of significantly reducing future use and spend for
temporary accommodation. 
A.5 Involving Communities and Other Stakeholders 
Internal consultation has taken place with relevant services and Tenant
Panel members. The RRTP consultation was also incorporated into the
Local Housing Strategy 2021-26. 
A.6 Impact on Performance and Outcomes
The RRTP sets out an ambitious plan to transform services provided to
homeless households in Midlothian, and is subject to annual review by
the Scottish Government. 
Page 211 of 340

Page 212

6
A.7 Adopting a Preventative Approach 
The RRTP contains activities that focus on the prevention of
homelessness, increasing tenancy sustainment, and reducing the need
for costly temporary accommodation, resulting in sustainable
communities. Other activities such as the redevelopment of Jarnac
Court ensure when temporary accommodation is required it is of a
good standard and people are able to quickly access the support they
need to prevent recurring homelessness in the future. 
A.8 Supporting Sustainable Development 
The use of Jarnac Court reduces further the further financial burden on
the Council; and ensures the effective use of vacant buildings is
maintained, resulting in sustainable use of Council assets. This is
achieved whilst not precluding the potential to redevelop Dalkeith town
centre to provide further permanent affordable housing. 
Page 212 of 340

Page 213

7 
APPENDIX B 
Background Papers/Resource Links (insert applicable papers/links) 
Rapid Rehousing Transition Plan link:
https://www.midlothian.gov.uk/download/downloads/id/4317/rapid_rehousing_
transition_plan_202122_-_202324.pdf 
Page 213 of 340

Page 214

Page 214 of 340

Page 215

Rapid Rehousing
Transition Plan
2022/23 – 2023/24
Item 8.13
Page 215 of 340

Page 216

Page | 2 
Page 216 of 340

Page 217

Page | 3 
Contents 
Page
1. Introduction 4
2. Midlothian Context 5
3. Homelessness in
Midlothian
11
4. Midlothian Council’s
RRTP 2nd year position
statement
16
5. Midlothian Council’s
Rapid Rehousing
Transition Plan
24
6. Resource Plan 39
7. Monitoring, Equalities and
Consultation
40
Appendix 1 Midlothian Council RRTP
2020/21 Activities and
Spend Report
41 
Page 217 of 340

Page 218

Page | 4 
1. Introduction
Following the publication of the Scottish Government’s Ending Homeless Together
Action plan all Local Authorities were required to publish a Rapid Rehousing
Transition Plan (RRTP) by December 2018. As part of these plans Local Authorities
were asked to demonstrate the following:
 How the will move to a rapid rehousing model over a period of no more than
five years.
 Demonstrate how both homeless demand will be met, and how any backlog of
homeless households currently in temporary accommodation will be
addressed. 
Midlothian Council’s original Rapid Rehousing Transition Plan was given approval by
a meeting of the full Council on 18th December 2018.  This set out a vision that by
2024: 
“An increased number of homeless households will obtain permanent
accommodation, no homeless household will be accommodated in bed and
breakfast accommodation, and the average time taken for the Council to complete its
homeless duty will have halved from 105 to 52 weeks.” 
The following key actions were identified to support this vision:
 Increasing the supply of affordable housing in Midlothian.
 Revise Midlothian Council’s Housing Allocation Policy to address the backlog
of homeless households already in temporary accommodation, and reduce
the time taken to house homeless households in the future.  
 Seek alternative models of temporary accommodation to reduce the need for
bed and breakfast accommodation. 
 Ensure homeless households are supported to access a wide range of
housing options, including the private rented sector.
 Develop a ‘housing first’ approach in Midlothian to house homeless
households with complex needs. 
Midlothian Council has updated its RRTP on an annual basis, with the most recent
version being approved in August 2021. These updated plans provide an update on
the activities undertaken during the year and which activities are to be prioritised in
future years. 
Midlothian Council has received support from the Scottish Governments Ending
Homelessness Together Fund to help deliver these activities. Table 1 gives details of
the confirmed funding allocated to Midlothian Council. It will not be possible to fully
transform the way services are delivered without securing additional resources. 
Table 1 Ending Homelessness Together Funding receive by Midlothian
Council
Initial Grant (development funding) £32,000
2019/20  EHT Funding £141,000
Page 218 of 340

Page 219

Page | 5 
2020/21 EHT Funding £137,000
Winter Support Fund 2020/21 £85,000
2021/22 EHT Funding £127,000
2022/23 EHT Funding £121,000
TOTAL £643,000 
Midlothian Council made decisions on which projects could be delivered within the
funding available, prioritising those it believes will have the most significant impact
on reshaping homelessness in Midlothian. Details of work undertaken and progress
made during 2021/22 is provided in Section 4. A detailed breakdown of spending for
each project up to the end of 2021/22 and projected spend in 2022/23 is included in
Appendix 1. 
This updated Rapid Rehousing Transition Plan will provide an update on the
progress made during 2020/21 and will show how Midlothian Council will continue
the work undertaken to deliver these projects during 2022/23. Midlothian Council
believes these activities are crucial, to reduce the time spent in temporary
accommodation, improving the quality of temporary accommodation and continue to
deliver Housing First. The plan also explains how Midlothian Council will address the
next phase of its approach to transforming the services provided to those in housing
need by developing other initiatives during 2022/23 and into 2023/24, with an
emphasis on the prevention of homelessness. Section 5 of this report sets out
Midlothian Council’s priorities for over the next two years. Section 6 sets out the
resources required to effectively deliver these activities.
2. Midlothian Context
2.1. About Midlothian
Midlothian is a small local authority area adjoining Edinburgh’s southern boundary
and framed by the Pentland Hills in the west and the Moorfoot Hills of the Scottish
Borders in the south. The majority of the population lives in larger towns and villages
in the northern part of the county. The southern half of the authority is predominantly
rural, with a small population spread between a number of villages and farm
settlements. 
The population of Midlothian accounts for 1.7% of the total population of Scotland. In
June 2020, the Midlothian population was 93,150. It is projected that by 2028 the
population will increase to 103,945 which is an increase of 10% compared to the
population of Scotland which is projected to increase by only 1.35% during the same
period (2020 to 2028)1. Chart 1 below, shows the projected population increase for
the Midlothian area which is estimated to be the highest percentage change to
population size in Scotland. 
1 Population Estimates | National Records of Scotland (nrscotland.gov.uk)
Page 219 of 340

Page 220

Page | 6 
Chart 1: Area Population Projections for Midlothian (2018 projections)2 
The SESplan Housing Need and Demand Assessment, published in 2015, assessed
housing need and demand in Edinburgh, Fife, East Lothian, West Lothian, Midlothian
and the Scottish Borders. It set Housing Supply Targets (HST) for each local
authority within the South East of Scotland area. A Project Team and Executive
Board comprising of representatives from each SESplan area was set up to deliver
the Housing Supply Target for the SESplan area. Table 2 below shows the Housing
Supply Targets agreed by SESplan Member Authorities for 2018-30 with 165
affordable housing and 369 market housing agreed for Midlothian.   
Table 2: SESplan Housing Supply Targets 2018-2030 
Affordable Market Combined
Annual
Average
Period
Total
Annual
Average
Period
Total
Annual
Average
Period
Total
City of
Edinburgh 1,200 14,400 1,220 14,640 2,420 29,040
East Lothian 189 2,268 330 3,960 519 6,228
Fife 262 3,144 605 7,260 867 10,404
Midlothian 165 1,980 369 4,428 534 6,408
Scottish
Borders 128 1,536 220 2,640 348 4,176
West
Lothian 300 3,600 333 3,996 633 7,596
SESPLAN 2,244 26,928 3,077 36,924 5,321 63,852 
It should be noted that a Housing Need and Demand Assessment (HNDA3) is
currently underway which will provide updated Housing Supply Targets for the
SESPlan area.                                            
2 Midlothian Council Area Profile (nrscotland.gov.uk)
92,000
94,000
96,000
98,000
100,000
102,000
104,000
106,000
2022 2023 2024 2025 2026 2027 2028
Midlothian
Page 220 of 340

Page 221

Page | 7 
As shown in table 3 below, the most common housing tenure in Midlothian is owner
occupied housing (66%) followed by social rented housing (25%) with private rented
housing accounting for 8% of dwellings in Midlothian. Compared to Scotland overall
there is a higher percentage of home owners and council tenants in Midlothian while
there is a lower proportion of private rented housing and Housing Association
properties. 
Table 3: Housing Tenure 
Midlothian Tenure
(000)
Scotland Tenure
(000)
Tenure % No. % No.
Owner occupied 66% 27 59% 1,551
Rented privately 8% 3 14% 376
Vacant private dwellings and
second homes 2% 1 4%  99
Housing Associations 8% 3 11% 284
Council Housing 17% 7 12% 316
Total 100% 41 100% 2,626
http://www.gov.scot/Topics/Statistics/Browse/Housing-
Regeneration/HSfS/KeyInfoTables   
The supply of social rented housing and private rented housing is particularly
important as the majority of homeless households will require rented accommodation
in order that they can be suitably housed in permanent accommodation. Table 4,
below shows that there are 10 RSLs who own housing in Midlothian. Midlothian
Council (7,121 homes), Melville Housing Association (2,010 homes) and Castle
Rock Edinvar Housing Association (1075 homes) all have a significant supply of
housing in the local area whereas the other providers have a smaller number of
units, and are often providers of specialist housing, such as retirement housing. 
Table 4: Stock Profile Collection by Midlothian Area
Type of provision Total Units %
Ark Housing Association 5 0.04%
Bield Housing Association 116 1%
Blackwood Housing Association 23 0.2%
Castle Rock Edinvar Housing Association 1075 10%
Dunedin Canmore Housing Association 98 0.9%
Link Housing Association 20 0.1%
Melville Housing Association 2010 19%
Midlothian Council 7121 68%
Trust Housing Association 35 0.3%
Viewpoint Housing Association 34 0.3%
Total 10,537 100%
Source: Scottish Housing Regulator 
Chart 2 below, shows the number of lets made by Midlothian Council in recent years.
It shows that there has been an increase in the number of lets made in recent years,
which is due to new build site completions and purchases of ex-council properties
from the open market. The level of turnover of council housing in Midlothian is low,
Page 221 of 340

Page 222

Page | 8 
with a turnover rate of 4% of council homes becoming available for re-let in
2021/223. This is significantly below the national average which is 8%. 
Chart 2: No. of lets made by Midlothian Council 
Chart 3 below shows the number of Housing Association lets in Midlothian in
2020/21 and 2021/22. It is clear from the chart that RSL lettings are low in Midlothian
however new build completions in 2021/22 by Melville and Castle Rock Housing
Associations boosted numbers. In 2021/22, there were 2694 lets by RSLs in
Midlothian, representing 8% of total RSL stock which reflects the national average.
Overall, RSL lettings and new build projects are very important as they provide
additional homes and options to people applying for housing in Midlothian. 
3 This figure does not include lets to new build properties or open market purchases; solely lets to existing
permanent properties in order to reflect an accurate turnover rate
4 Does not include data from Bield, Blackwood or Trust Housing Associations
0
100
200
300
400
500
600
700
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
No. of lets made by Midlothian Council
No. of lets made by Midlothian Council
Page 222 of 340

Page 223

Page | 9 
Chart 3: No. of RSL lets in Midlothian 
Midlothian Council has a target to let 60% of its housing to homeless households.
This target is higher than the average for Councils in Scotland and significantly
higher when compared to the average for housing associations in Scotland.
Midlothian Council let 431 homes in 2021/22 of which 253 were to homeless
households which, at 59% is just below target. 
Table 5 shows the number of private lets advertised in Midlothian. It should be noted
that lets within the private rented sector were heavily impacted by the Covid
pandemic in 2020 and continued to be so in 2021. It can be assumed that a small
number of households are no longer homeless as a result of obtaining a private
rented tenancy. 
Table 5: No. of private sector lets in Midlothian 2020-20215
Year 2020 2021
No. of lets 133 138 
2.2. Investment in new Council housing in Midlothian 
The Council is committed to the construction of new build council homes in
Midlothian. A Future Land Supply Report providing an update on the Council House
Building programme was submitted to a meeting of full Council in March 2022. Table
* below details sites in the current programme which are either on site or coming
forward. 
Table *: Emerging sites 2021/22                                            
5 Data obtained from www.zoopla.co.uk and may not capture all available private lets being advertised in a
year.
0
50
100
150
200
250
300
2020/21 2021/22
Chart Title
Melville HA CRE HA Link HA Dunedin Canmore HA Viewpoint HA Ark HA
Page 223 of 340

Page 224

Page | 10 
Project Address No. of
properties
Estimated
/ Actual
site start
Estimated /
Actual
completion
Bonnyrigg, Burnbrae Road 21 Mar-22 Jun-23
Bonnyrigg, Cockpen
Terrace
16 Mar-22 Jan-23
Bonnyrigg, Dalhousie
(Springfield Homes)
70 Jan-21 Jun-22
Bonnyrigg High Street
(Complex Care)
20 May-22 Mar-24
Bonnyrigg Polton Street
(Complex Care)
46 Mar-22 Jun-24
Dalkeith Newmills Road
(Care Housing)
48 Mar-21 Dec-22
Dalkeith Newmills Road
(General Needs)
44 Mar-21 Dec-22
Gorebridge, Newbyres
Crescent
72 Mar-22 May-24
Mayfield, Conifer Road 72 Mar-22 Mar-24
Mayfield, Former
Newbattle High School
98 Sep-22 Apr-24
Newtongrange, Morris
Road
79 Aug-18 Jul-22
Dalkeith, Buccleuch Street 7 Feb-22 Nov-22
Roslin, Moat View (Barratt) 53 Feb-22 Jan-24
Shawfair (Dandara) 18 Feb-22 Apr-23
Danderhall, Newton
Church Road
(Leisure Centre)
24  
Danderhall, Newton
Church Road
(Barratt)
33 Sep-22 Feb-24
Shawfair Plot P 49 Jun-22 Mar-24
Total 770   
Midlothian’s Strategic Housing Investment Plan 2022/23-2026/27 contains details of
all planned social housing sites in the area: 
https://www.midlothian.gov.uk/downloads/file/4395/strategic_housing_investment_pl
an_202223_to_202627 
2.3. Pressure analysis
Table 6 below shows the areas in Midlothian which are in greatest demand from
homeless applicants. Dalkeith is in most demand with 23.2% of homeless applicants
waiting for a permanent home there, this is followed by Penicuik (16.7%),
Bonnyrigg/Lasswade (14.7%) and Mayfield (10.6%). When examining these in
conjunction with the affordable housing supply programme above, it is evident that
the programme is working to address the issue.
It is of importance to note that Midlothian Council let 431 properties in 2021/22 and
Page 224 of 340

Page 225

Page | 11 
of these, 253 lets were to homeless applicants. Were the council to let properties
solely to homeless applicants, it would take 1.4 years to permanently house those
currently on the waiting list. 
Table 6: No. of homeless applicants on waiting list by area
Area Number %
Auchendinny 2 0.3%
Bilston 4 0.6%
Bonnyrigg/Lasswade 93 14.7%
Carrington 0 0.0%
Cousland 0 0.0%
Dalkeith 147 23.2%
Danderhall 13 2.1%
East Lothian 3 0.5%
Edinburgh 11 1.7%
Gorebridge 48 7.6%
Loanhead 57 9.0%
Mayfield 67 10.6%
Newtongrange 25 3.9%
Nfa 30 4.7%
North Middleton 0 0.0%
Other 11 1.7%
Pathhead 5 0.8%
Penicuik 106 16.7%
Poltonhall 4 0.6%
Rosewell 5 0.8%
Roslin 1 0.2%
Temple 0 0.0%
West Lothian 2 0.3%
Total 634 100% 
2.4. Open Market Purchases
Midlothian Council has an Open Market Purchase Scheme whereby ex-local
authority properties are purchased from the open market and let to those on the
waiting list. Midlothian Council plans to purchase a further 80 properties between
2022/23 and 2026/27. 
3. Homelessness in Midlothian
This section will provide an update on homeless trends in Midlothian during 2021/22,
reflect on the impact of COVID-19 and the positive changes realised through the
revised Housing Allocation Policy. All data presented in this section is sourced from
Midlothian Councils HL1, HL2 and HL3 return to the Scottish Government.
During 2021/22 there has been a further reduction (11%) in the overall number of
households seeking homeless assistance compared to the previous year. Table 7
shows this while the proportion of applications from households with dependent
children has remained relatively unchanged since the previous year. 
Page 225 of 340

Page 226

Page | 12 
Table 7: Number of homeless applications per year 
2015/1
6
2016/1
7
2017/1
8
2018/1
9
2019/2
0
2020/2
1
2021/2
2
Total
homeless
application
s
526 509 566 495 481 490 432
% of
households
with
dependent
children
44% 46% 41% 39% 41% 35% 34%
% of
households
with no
children
56% 54% 59% 61% 59% 65% 66% 
This reduction in homeless applications during 2021/22 has mostly been as a result
of fewer people aged 18-59 seeking assistance. Table 8 shows there was a 23%
reduction in presentations from applicants aged 18-25, and a 10% reduction from
those aged 26-59 compared to 2020/21. During the same period the number of
applications from 16-17 year olds increased by 36%, this is still less than the number
of presentations each year from 2015/16 – 2018/19.
Table 8: Number of applications by age (percentage of all applications) 
2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
16-17 29 (6%) 25 (5%) 34 (6%) 29 (7%) 20 (4%) 14 (3%) 22 (5%)
18-25 137
(26%)
120
(24%)
153
(27%)
130
(26%)
112
(23%)
155
(32%)
119
(28%)
26-59 339
(64%)
344
(67%)
359
(63%)
311
(62%)
320
(67%)
299
(61%)
269
(62%)
60+ 21 (4%) 20 (4%) 20 (4%) 25 (5%) 29 (6%) 22 (4%) 22 (55) 
It is important for gender and household type to be taken into consideration when
delivering services to homeless people. In 2021/22 Midlothian Council received 263
requests for homeless assistance from single person households, 40% of which
were from female applicants. The number of applications from single parents
reduced from 157 in 2020/21 to 127 in 2021/22, of which 67% were female. It is also
important to recognise that woman and children are far more likely to require
assistance as a result of domestic violence. 59 people sought homeless assistance
as a result of domestic abuse or other violence in the household during 2021/22. 57
of these approaches for assistance were from female applicants, 40 of which had
dependent children in the household. 
Table 9 gives a breakdown of the reason given for requesting homeless assistance
from Midlothian Council. People being asked to leave by friends/relatives or leaving
accommodation following a breakdown in relationship with a partner or parents
remains the main cause of homelessness in Midlothian. The Coronavirus (Scotland)
Page 226 of 340

Page 227

Page | 13 
Act 2020 contained measures to protect renters during the pandemic, including and
a ban on evictions in areas subject to Level 3 and 4 restrictions and extended notice
periods and all grounds becoming discretionary. During 2021/22 these measures
were phased out with the last ones ending in March 2021. This has resulted in the
reduction in the number of applications made as a result of a landlord taking action
to end the tenancy during 2020/21 continuing through 2021/22.
Table 9: Technical reason for homeless application 
2015/1
6
2016/1
7
2017/1
8
2018/1
9
2019/2
0
2020/2
1
2021/2
2
Asked to leave  157 138 189 133 101 151 130
Dispute within
household /
relationship
breakdown:
non-violent 
84 103 86 99 138 150 127
Dispute within
household:
violent or
abusive 
105 104 117 73 78 69 53
Other reason
for loss of
accommodatio
n
25 25 46 20 43 43 57
Overcrowding  12 14 10 24 26 22 14
Discharge from
prison /
hospital / care
/ other
institution 
17 11 15 19 16 11 9
Other action by
landlord
resulting in the
termination of
the tenancy 
55 57 38 66 38 8 17
Fleeing non-
domestic
violence 
3 1 1 1 9 8 6
Emergency
(fire, flood,
storm, closing
order from
4 2 1 1 1 5 0
Page 227 of 340

Page 228

Page | 14 
Environmental
Health etc.) 
Other reason
for leaving
accommodatio
n / household 
39 23 26 40 3 6 3
Harassment  4 2 3 1 1 5 7
Termination of
tenancy /
mortgage due
to rent arrears
/ default on
payments 
12 16 21 10 13 4 4
Forced division
and sale of
matrimonial
home 
9 7 5 2 4 4 3
Applicant
terminated
secure
accommodatio
n
2 3 6 5 9 3 1
Loss of service
/ tied
accommodatio
n
2 4 3 1 2 0 1 
Since 2017/18 the number of ongoing homeless cases closed each year has
exceeded the number of presentations made to Midlothian Council. Resulting in a
significant reduction in the overall number of homeless households who are waiting
to be rehoused in Midlothian, this is shown in Table 10. Midlothian Councils 2019/20
RRTP including a target to reduce the number open homeless cases to 860 by
2023/24, As a result of the number of open cases being below this for the previous
two years the target was revised in 2021/22. The revised target was for the number
of open homeless cases to be below 700 by 2023/24. As this this target has already
been achieved as further revision has been made to in this year’s action plan. The
table also shows the proportion of people who secure some form of permanent
accommodation (Scottish Secure or Private Residential Tenancy) has continued to
increase from 42% of all closed cases in 2015/16 to 65% in 2021/22. In 2021/22 this
has largely been maintained by the revisions made to Midlothian Councils Housing
Allocation Policy which increased the proportion of lets to homeless households, and
the number of properties completed as part of the new build housing programme.
Page 228 of 340

Page 229

Page | 15 
The number of people securing a Private Residential tenancy has reduced from 55 in
2020/21 to 31 in 2021/22, this is reflective of a reduction in the number of properties
available in the area with rents that are within Local Housing Allowance rates.
Table 10: Number of closed and ongoing homeless cases in Midlothian 
2015/1
6
2016/1
7
2017/1
8
2018/1
9
2019/2
0
2020/2
1
2021/2
2
Number of
cases closed
504  447  571  678  537  531  615
Number of
open cases on
31st March
1025  1087  1082  899  843  802  630
% closed to LA
or RSL
tenancy
41% 46% 42% 46% 51% 54% 60%
% closed to
Private Rented
Accommodatio
n 
1% 1% 1% 8% 7% 10% 5% 
As Midlothian Council moves on to the next phase of Rapid Rehousing it will focus
on activities which aim to prevent homelessness to further reduce the number of
homeless applications made.
Table 11 shows that the average time taken to close a homeless case in Midlothian
reduced during 2021/22, this shows to positive impact of the revised allocations
policy in previous years reducing the number of long term legacy cases.  The
average length of stay in temporary accommodation (Table 12) also reduced during
this period. 
Table 11: Average case duration (weeks) 
2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
Average
case
duration
91.7  108.1  109.4  106.7  109.2  118.1  97.9 
Table 12: Length of stay (weeks) in temporary accommodation 
2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
Total
(all)
- 95.1  36.1  60.6  72.5  87.3  76.2 
Midlothian Council anticipated these averages to increase during 2020/21 and
remain relatively high during 2021/22 as more temporary tenancies were ‘flipped’ to
permanent accommodation and an increase in the number of permanent lets to
homeless applicants. This resulted in those who have been in their accommodation
for long periods being housed reflecting the positive impact of the Housing
Allocations Policy and the delivery of preventative housing options advice. Long term
Page 229 of 340

Page 230

Page | 16 
the activities undertaken as part of Midlothian Councils transformation of services will
continue to focus on reducing the time taken to make an offer of permanent housing,
and reducing the length of time in temporary accommodation. 
4. Midlothian Council’s RRTP 3rd year position statement
Midlothian Council continued to develop key projects that could best achieve the
outcomes detailed in previous years RRTP during 2021/22. This section will provide
an update on the development and delivery of this work. A full breakdown of the
funding allocated to each activity is included as Appendix 1. 
4.1. Housing Allocations Policy
After receiving approval at a full Council meeting in December 2019, Midlothian
implemented a revised Housing Allocations Policy in April 2020. Work to implement
these changes has continued during 2021/22. The key changes to the policy were:
 Increase the proportion of permanent lets to the homeless list – As previously
stated Midlothian Councils new allocations policy established a target of
allocating 60% of void properties to homeless applicants. In 2021/22 205 void
properties were let to homeless households, a slight increase from 194 in
2020/21, and more significant increase from 150 in 2019/20. When combined
with the number of ‘flipped’ temporary accommodation properties, this is the
equivalent of 58.7% of Midlothian Council lets, compared to 54% in the
previous year.
 Flipping tenancies – Converting temporary accommodation to permanent
accommodation has also been scaled up as part of the new Housing
Applications Policy. During 2021/22 48 households had their temporary
accommodation ‘flipped’ to a permanent council tenancy in this way. A slight
reduction to the 51 completed in 2020/21, this is due to a significant staff
resource required to allocate and let new build properties which have been
completed during this period. This practice has helped to reduce the number
of households who have been in their temporary accommodation for over two
years from 189 in 2018/19 to 51 at the end of 2021/22 (52 at the end of
2020/21). All those households who had been in temporary accommodation
for over two years on 31st March 2022, have either been offered and declined
the opportunity to have their accommodation made into a permanent tenancy,
or the property is not suitable to be flipped in this way.
 Improving opportunities for general needs applicants – The Housing
Allocations Policy includes measures intended to ensure other households in
housing need are able to access suitable accommodation without the need to
present for homeless assistance. These measures are also designed to
ensure that the Council makes best use of its available housing stock by
allocating to those in most need. The changes include increased incentives
for people willing to downsize and encourage mutual exchanges. During
2021/22 59 mutual exchanges involving a Midlothian Council tenant were
completed. 80 applications were submitted to the incentive to move scheme
after following the completion of a mutual exchange, or an existing tenant
downsizing to a smaller property in 2021/22.  Due to the restriction on
unnecessary house moves during much of 2020/21 it is not possible to fully
evaluate the effectiveness of these measures compared to previous years.
The ongoing effectiveness of these initiatives will continue to be monitored in
Page 230 of 340

Page 231

Page | 17 
future years. 
4.2. Housing First
Midlothian Council launched Housing First on 1st July 2020. The successes of the
first year pilot have continued to be realised during 2021/22. Midlothian Council met
its target of creating 20 Housing First tenancies in the first year and remains on
course to create a further 20 in year two. 
A partnership approach is taken to identifying and supporting homeless people who
may benefit from the Housing First approach. Services from a range of disciplines
including, Housing, Homelessness, Justice, Mental Health, Substance Misuse,
Midlothian Womens Aid, Domestic Abuse Service and other third sector
organisations have all committed to the delivery of Housing First in Midlothian. 
As of 31st March 2022 there have been no evictions from a Housing First tenancy in
Midlothian. 33 people continued to engage with the support provided through
Housing First, five of which are in the ‘step-down’ process. Since the launch of
Housing First two tenants have sadly passed away. 
Midlothian Council has participated in the inaugural Housing First Check-Up process
led by Homeless Network Scotland. The purpose of this process is to help local
authorities to consider the quality and effectiveness of Housing First services, the
fidelity to the principles of Housing First, and assess improvement methodology
around local systems. A full report of the outcomes will be provided by Homeless
Network Scotland in June 2022. 
Midlothian Council has committed to creating a further 20 Housing First tenancies in
the third year of the programme. To ensure people are properly supported in their
tenancy the number of support hours available in the service will be increased. A full
review of Housing First in Midlothian will be completed in autumn of 2022. This
review will consider the options for mainstreaming the service on a long term basis,
ensuring people are sufficiently supported within their tenancy, and seek the views of
service users to improve the service. It will also take into account the feedback
received through the Housing First annual check-up process. 
4.3. Review of temporary accommodation
Midlothian Council recognises the need to ensure that when temporary
accommodation is required it is of a good quality, affordable, and meets the needs of
the individual and has undertaken several activities to reflect this. 
4.3.1. Ending unsuitable accommodation
Midlothian Councils RRTP for 2020/21 set out plans to end the use of Bed and
Breakfast type accommodation by the end of April 2021. This was to ensure
compliance with the Scottish Government’s intention to extend the Unsuitable
Accommodation Order (UAO) to all homeless households by this date. A Local
Authority would be in breach of the order if any homeless person is placed in
unsuitable accommodation for more than 7 days. 
As part of its response to COVID-19 the Scottish Government moved the date for
Page 231 of 340

Page 232

Page | 18 
implementing these changes to May 2020. With the following additional exemptions: 
 a person in the household has symptoms of coronavirus and the household
requires to isolate;
 the accommodation is required to provide temporary accommodation to
ensure that a distance of 2 metres can be maintained between a member of
the household and a person who is not a member or the household in order to
prevent the spread of coronavirus
 The local authority is unable to place the household in suitable
accommodation as a result of the impacts of coronavirus on temporary
accommodation supply in the area (this exemption only applies to households
without a dependent child or pregnant person). 
In response to these changes Midlothian Council was successful in ending the use of
B&B type accommodation in November 2020, and has not placed any household in
accommodation considered unsuitable as defined by the UAO since this time. 
The cost of using emergency accommodation provided by third party contractors
was £526,930 in 2019/20. Many of the savings realised by ending the use of this
accommodation will be used to fund other RRTP activities, where possible. These
activities will have a clear focus on the prevention of homelessness, including
increasing the number of households assisted to private rented accommodation and
providing direct assistance to help people remain in their current accommodation. 
4.3.2. Shared temporary accommodation
During 2020, Midlothian Council developed shared temporary accommodation which
satisfies the UAO guidance, to replace bed and breakfast accommodation. This
accommodation uses two bedroom properties to provide accommodation for single
person households each with their own bedroom, while sharing kitchen, bathroom
and living room areas with one other person. This type of accommodation is more
affordable for people who are in employment, and also increases opportunities for
others to access education, training and employment. 
Midlothian Council’s original RRTP included plans for 20 properties to be used in this
way. During the initial stages of the COVID-19 pandemic this was increased to 33
properties to accommodate up to 60 households. Ensuring sufficient capacity for all
those in B&B type accommodation plus additional capacity to meet the increased
demand for temporary accommodation at the time. 
At the end of March 2022, 21 properties were being used to provide this type of
temporary accommodation. As some residents have been permanently housed,
some of those remaining in the shared temporary accommodation have been offered
the opportunity to have the property converted to a permanent Scottish Secure
Tenancy. 
These properties are managed by a 0.5 FTE Temporary Accommodation Officer, this
post is funded up to the end of 2022/23. 
Page 232 of 340

Page 233

Page | 19 
4.3.3. Emergency accommodation for families
Midlothian Council established emergency accommodation to provide fully furnished,
self-contained, accommodation for up to eight households with either children or a
pregnant person in the Mayfield area. This project became fully operational in July
2020. A review of furnishings in the accommodation in January 2021 ensured all flats
were able to provide accommodation to families with up to three children in the
household. 
To ensure sufficient accommodation for larger families a second project in the
Gorebridge area was completed in July 2021. This project provides self-contained,
fully furnished accommodation for a further five households, two of the properties
provide accommodation for households with up to four children. 
An on-site caretaker service during office hours provides basic support to residents
as required, while also maintaining the security and cleanliness of the building and
monitoring anti-social behaviour. 
These projects will be managed by a 0.5 FTE Temporary Accommodation Officer,
this post is funded up to the end of 2022/23.
4.3.4. Supported accommodation – Jarnac Court
In December 2019 Midlothian Council approved revised plans to refurbish an office
building in the centre of Dalkeith to be re-purposed as supported accommodation for
at least five years. The project will provide supported accommodation for 22
households that is of good quality with access to support appropriate to the needs of
the individual, including 14 double bedrooms. Residents will be able to access two
fully fitted kitchens, two communal livings areas, and laundry facilities, a number of
the bedrooms have en-suite facilities. There are a variety of office/meeting areas
within the accommodation which all allow residents to be provided with any support
required in a private setting. Services from Midlothian Health and Social Care
Partnership, including mental health and substance misuse teams will also provide
specialist support on site. This will ensure people are able to have their support
needs assessed quickly and receive the support they require. Following a delay to
building work commencing due to COVID-19 the project is now scheduled for
completing in spring 2022. 
On completion a full review of supported accommodation in Midlothian will be
completed. This will ensure the support provided and capacity meets the needs and
wishes of homeless people in Midlothian. 
4.3.5. Review of temporary accommodation rents
It is important that when needed temporary accommodation is accessible to all
homeless households who require it, regardless of income. In February 2020
Midlothian Council approved plans to include revisions of rent charges for self-
contained temporary accommodation as part of the next rent strategy. 
A further full council meeting in February 2021 decided to defer the rent setting
strategy for 2022-25. This work will be completed in the autumn of 2022. 
Page 233 of 340

Page 234

Page | 20 
4.4. Housing Education 
Two housing education projects are included in Midlothian Council’s RRTP. These
projects focus on preventing youth homelessness from occurring, promoting tenancy
sustainment, preventing recurring homelessness. 
4.4.1. Schools education programme
Midlothian Councils homelessness team have an established programme of
providing housing education to S4 and S6 pupils as part of the school curriculum. As
a result of the limitations imposed on external visitors in schools settings during the
Covid-19 pandemic is was not possible to deliver this during 2020/21 and 2021/22. 
Officers are currently liaising with individual schools to deliver this programme during
2022/23. The aim of each session is to educate on homelessness, housing options,
and budgeting. Providing a more locally focused information in order to give wholly
accurate collections of information young adults in readiness for their leave from
home. 
4.4.2. SQA accredited Tenancy and Citizenship award 
In December 2018 a pilot programme for a SQA level 4, Tenancy and Citizenship
Award was completed, resulting in four young parents successfully graduating. 
Following the success of this pilot the course materials have been revised during
2021/22. Creating a suite of six standalone modules covering the following
outcomes:
 Gaining and sustaining a tenancy
 Looking after your home
 Living in your community
 Understanding principles of money
 Money management
 Cookery skills, techniques and process. 
Modules have been designed in a way that allows them to be built into support plans
to help achieve better outcomes for the individual. Course materials have been
designed in such a way that they can be delivered directly by support workers.
Services users will be able to access the modules most relevant to them. 
While primarily being delivered to households in supported accommodation,
households in any type of temporary accommodation or Housing First tenancy will
be able to access the revised modules. Midlothian Council believes this will promote
tenancy sustainment and reduce instances of recurring homelessness. 
4.5. Crisis Intervention Fund
Proposals to introduce a Crisis Intervention Fund were approved by Midlothian
Council in May 2021. The fund launched in July 2021 and is accessible to front line
officers allowing a more preventative approach to be taken when assisting those in
housing need. Examples of where the fund may be used include; preventing action
Page 234 of 340

Page 235

Page | 21 
to end a tenancy being taken following an unforeseen change in circumstances,
enabling a household to access accommodation they would otherwise be able to,
assisting a household to remain in their current accommodation until a planned move
to alternative accommodation is completed. 
The fund will operate as a two year pilot to enable its effectiveness to be fully
evaluated with an interim review completed after 12 months. An annual budget of
£30,000 has been committed to the fund for the duration of the pilot. Making use of
savings realised from ending the use of B&B accommodation. 
During 2021/22 4 people were provided with assistance totalling £3060.09. This
reflects the nature of homeless presentations during this period and limited
availability of private rented accommodation during this period. The Scottish
Government Tenant Grant Fund was also successfully implemented in Midlothian
during this time, providing assistance to 75 households who had accrued rent
arrears as a result of the Covid-19 pandemic who may have otherwise required
assistance from the prevention fund. 
4.6. Nomination agreement with East and Midlothian Women’s Aid
The long-standing nomination agreement between Midlothian Council and East and
Midlothian Women’s Aid was revised in August 2020, resulting in a minimum of four
nominations to be made by East and Midlothian Women’s Aid. 
Those nominated by East and Midlothian Women’s aid are provided with a
permanent Scottish Secure Tenancy without the need to present to the Local
Authority for homeless assistance. Support is provided to help address practical
issues such as registering with GP, liaising with schools, setting up utility accounts,
and settling into the community, in addition to emotional support. 
In April 2022, both parties agreed to continue this nomination agreement. 
4.7. Improving access to the private rented sector.
It is important for people who are homeless or threatened with homelessness to
have access to the widest possible range of housing options. Since the introduction
of the Private Residential Tenancy in December 2017 Midlothian Council has
provided direct financial assistance to households who are prevented from accessing
this accommodation due to lack of a deposit. In 2021/22 31 homeless households
secured a private rented tenancy, of those 11 received direct assistance to secure a
deposit. This is reflective of a reduced number of properties available within LHA
rates, and increased competition for those properties being reported by front line
officers. 
The increased budget of £32,000 approved for 2021/22 will remain in place for
2022/23. This increased utilises savings made from ending the use of B&B type
accommodation. 
4.8. Sustainable Housing on release For Everyone (SHORE) Standards
In November 2019, Midlothian Council’s Community Safety and Justice Partnership
established a multi-disciplinary group to work in partnership in the provision of
Page 235 of 340

Page 236

Page | 22 
supporting people returning to the community after serving a custodial sentence.
This group includes representatives from, Justice, Mental Health, Substance Misuse,
Housing/Homelessness and two third sector organisations. In addition to securing
suitable housing the group works in partnership to develop support plans to help
people address other, often complex, support needs that meet their individual needs.
All support provided through this project is delivered from a trauma informed
perspective. In 2021/22 this group was expanded to include representatives from the
DWP, Job Centre Plus, and Communities and Lifelong Learning. 
The Community Safety and Justice Partnership continues to fund an additional two
workers from third sector organisations as part of this project. One post provides
transitional support to help people to engage with other services. A second post is
tasked to build a network of volunteer peers, to support clients in preparation for
returning back to the community, often with the focus on reducing isolation and
support those who are on the periphery of re-offending. 
During 2021/22 42 people scheduled to be released from prison were discussed at
this group, accommodation was made available to all those who were identified as
having nowhere to stay in advance of release. 
4.9. Staff resources
In April 2021 an additional Homelessness Officer was recruited for two years. This
post will provide an additional resource to reduce individual caseloads and afford
officers with more time to focus on providing advice and assistance to prevent
homelessness. 
4.10. Staff Training
Midlothian Council is committed to ensuring a person-centred and trauma informed
approach is taken to the delivery of services, with responses that are tailored to the
individual needs and circumstances of those in need of assistance. 
During 2020/21, the majority of staff from Homelessness and Housing Services,
including front line officers and managers have completed Level 1 Trauma Informed
Training delivered through the NHS Education led pilot programme. This training
provided staff with an understanding of the ways adverse and traumatic events in
childhood and later life impact on homelessness. Support workers from contracted
tenancy support, housing first and supported accommodation services were also
able to access this training. Following an evaluation of this training Midlothian Health
and Social Care Partnership are recruiting a Trauma Informed Practice Development
worker, this post will be responsible for ensuring the training is made available to all
partners in to develop a trauma informed community. 
Additional staff training is delivered through Midlothian Councils Health and Social
Care Partnership’s ‘The Midway’ project. This training is available to all staff from
within the Health and Social Care Partnership, Council staff, Primary Care providers,
and the Third Sector. This includes the ‘Good Conversations’ training course. This
training helps staff to deliver services that focus on what matters to the person, and
ensures responses are based on the strengths, needs and wishes of the individual. 
Page 236 of 340

Page 237

Page | 23 
Frontline Homelessness, Temporary Accommodation and Housing Officers have all
been provided with Domestic Abuse Awareness Training. 
The Health and Social Care Partnership also co-ordinate a series of bite sized
training/awareness sessions throughout the year. These sessions aim to better equip
staff to recognise and address unfair disadvantages people face to leading healthy
lives. Topics include, substance misuse, grief and loss, access to work and housing
and homelessness. 
All frontline staff from Homelessness, Temporary Accommodation and Housing
Services have access to the first three modules of the Housing Options Training
Toolkit. Modules five and six are expected to be made available to users during May
2022, with Module four still in production. 
4.11. Domestic abuse pathway 
Midlothian Council supports a zero tolerance approach to domestic abuse, and
supports the recommendations of the Improving Housing Outcomes for Women and
Children Experiencing Domestic report published in December 2020. This
commitment to taking action to support the victims of domestic abuse has been
affirmed by signing the Women’s Aid, Chartered Institute of Housing, and Domestic
Abuse Housing Alliance, Make a Stand pledge 
Domestic abuse is one of the main reasons for people seeking homelessness
assistance in Scotland. It is important for services to be delivered in a way that meet
the needs of women, children and young people affected by violence against women
and girls. 
As any future polices relating to Housing and Homelessness are developed,
Midlothian Council will ensure they give full consideration to the specific needs of
women and children experiencing domestic abuse. This work has continued in the
delivery of RRTP projects during 2021/22:
 Training for all front line homeless staff. This training provides staff with the
skills required to deliver services in a sensitive manner that does not put the
victim at risk of further abuse. 
 Developing an Equally Safe policy.
 Developing shared temporary accommodation. This provides an alternative
temporary accommodation option for women fleeing domestic abuse
removing the need to access larger scale congregate accommodation where
many other residents will be male. 
 Revising the delivery of Housing First. Membership of the multi-agency core-
group was reviewed in March/April 2021 to include representation from
services who provide support to women experiencing domestic abuse. This
provides an additional route to accessing Housing First, and also helps
maintain the safety of victims by ensuring perpetrators are not knowingly
accommodated in an area that would put a person at further risk.
 Embedding partnership working with East and Midlothian Woman’s Aid,
Domestic Abuse Service and MARAC within the delivery of housing
management functions. 
Page 237 of 340

Page 238

Page | 24 
4.12. Homeless Prevention - Escalating HARM joint working group
Midlothian Council’s Housing Services Team has established an Escalating HARM
group to provide support to tenants potentially at risk of losing their home. This multi-
discipline group includes representatives from the following agencies: Housing
Services, Adult Health and Social Care, Children’s Services, Police Scotland, Mental
Health Services, and any relevant third sector partners. The group meets at short
notice to develop agreed packages of support to prevent further action being taken
to terminate a tenancy, with a focus on early intervention and partnership working. 
4.13. Improving health and homeless outcomes
As part its strategic plan Midlothian’s Health and Social Care Partnership is
committed to providing additional resources to people in supported accommodation
to ensure they are able to access appropriate support as early as possible. These
services are delivered directly within the accommodation with the intention of
removing potential barriers to accessing services and improve engagement. With
two posts funded by the Health and Social Care Partnership and Justice Service. 
During 2021/22 the Health and Homelessness Steering group has continued to
meet, with a continued focus on ensuring the safety and wellbeing of homeless
people during the pandemic, and ensuring homeless households in Midlothian are
able to access vaccines. 
Additional projects being considered by the steering group include, provided gym
passes for people in supported accommodation, promoting digital inclusion through
the provision of Wi-Fi, and the creation of a digital library in supported
accommodation. 
5. Midlothian Councils Rapid Rehousing Transition Plan 
5.1. Key outcomes
Midlothian Council’s original RRTP set out 4 key outcomes that would achieve the
overall vision of the RRTP:
Midlothian’s vision for the Rapid Rehousing Transition Plan is that by 2024: 
“An increased number of homeless households will obtain permanent
accommodation, no homeless household will be accommodated in bed and
breakfast accommodation, and the average time taken for the Council to complete
its homeless duty will have halved from 105 weeks to 52 weeks.”
A set of actions is associated with each outcome which will only be achieved if the
Council and key stakeholders work in partnership. More detail on the proposed
actions is provided in section 5.2. Some of the outcomes and activities will be
revised over the coming years to ensure that the RRTP remains a relevant strategic
document.   
Outcome 1: The supply of permanent accommodation for homeless
households has increased.
Achieving a significant increase in the supply of affordable housing is key to
Page 238 of 340

Page 239

Page | 25 
providing homeless households, and others in housing need, with a settled housing
outcome as soon as possible. The low supply of affordable housing has been the
biggest contributor to issues such as the length of time taken to close a homeless
case and lengthy periods spent in temporary accommodation. 
As stated earlier there has been significant investment in new housing over a
sustained period of time in Midlothian. It is important that this investment continues
as set out in the Strategic Housing Investment Plan 2021-26. 
This investment alone will not be sufficient to deliver the wider aims of the RRTP. It
is important to maximise the opportunities to prevent homelessness from occurring,
and for homeless households to have access to the widest choice of housing options
including improving access to the private rented sector. 
Outcome 2: Where temporary accommodation is required it is of good
standard with access to effective support.
This outcome was revising in 2021/22 after successfully ending the use of Bed and
Breakfast accommodation in 2020. It is important that measures continue to be in
place to ensure there is no risk of using unsuitable accommodation in the future. 
Good progress has been made to reduce the number of households who have been
in temporary accommodation for over two years. To ensure the overall objective of
reducing this number to zero by 2023/24 access to permanent accommodation for
homeless households will need to continue to increase. 
To ensure accommodation meets the needs of homeless households in Midlothian a
review of council owned supported accommodation will need to be completed.
Partnership working with other agencies including those from the Health and Social
Care Partnership must continue to ensure support needs can be assessed at the
earliest opportunity. 
Outcome 3: Homeless households with support needs supported to
access and maintain permanent accommodation.
To ensure people who have experienced long term/repeated homelessness with
multiple/enduring support needs are supported to live a sustainable way of life,
Midlothian Council will continue to deliver up to 20 Housing First tenancies a year
during 2022/23. 
Midlothian Council will continue the work of the Health and Homelessness Steering
Group to review and improve service provision to maximise opportunities to prevent
homelessness and improve outcomes across all services. 
To deliver effective support to homeless people, Midlothian Council will need to
develop effective partnership working practices with other organisations to ensure
people’s wider support needs are also addressed alongside housing need. 
To protect staff and services users, it has not been possible to deliver some housing
education projects during 2020/21, and 2021/22 as a result of restrictions preventing
access to schools and restrictions on accessing supported accommodation for staff
Page 239 of 340

Page 240

Page | 26 
who do not usually work at the property. The delivery of these projects will be
reviewed as the easing of restrictions allows. 
Outcome 4: Housing Options and support is in place to prevent
homelessness
In Midlothian it is important that opportunities for homeless prevention and housing
options activities are maximised due to the low supply of social rented housing. 
The Housing Options process begins when the local authority is approached by
anyone in housing need. It is important for people to be offered the widest choice of
housing options, at the earliest opportunity. The advice should also cover other
circumstances which may not be housing related, such as debt, employment,
mediation, and mental health issues. To deliver these services effectively it is
important that staff delivering the Housing Options service are well trained and able
to provide a person centred approach. 
As many people may not seek face-face advice in the first instance it is important
that housing options advice is available through as many sources as possible,
including digitally, and in a variety of local settings such as libraries and GP
surgeries. 
The RRTP also identifies a need to make greater use of the private rented sector,
and consider innovative ways to prevent homelessness through a crisis intervention
fund. It is important that these initiatives are available to people at the earliest
opportunity, and not only those at risk of losing their accommodation in the next 56
days. 
Page 240 of 340

Page 241

Page | 27 
5.2. Action Plan 
Midlothian Council Rapid Rehousing Transition Plan: Action Plan (updated June 2022)
Outcome 1: The Supply of permanent accommodation to homeless households has increased
What Actions are planned Lead
Partners
Timescale Current
indicator
2021/22
Target indicator
2023/24
Resource
requirement
Comments
1.1 Increase number of Scottish
Secure Tenancies allocated
to homeless households in
Midlothian
Midlothian
Council,
RSLs
Ongoing 373 Homeless
cases closed
after securing a
Scottish Secure
Tenancy
350 let to
homeless
households by
Council and
RSLs
Existing
resources 
1.2 Fully implement updated
Housing Allocations Policy
Midlothian
Council,
RSLs
Ongoing 58.7% lets to
homeless
households
60% lets to
homeless
households
Existing
resources 
1.3 Review nominations
agreement with RSLs to
ensure homeless
households are housed
more quickly
Midlothian
Council
RSLs
Ongoing Annual Review - Existing
resources
Review completed in
2021/22. Will be kept
under ongoing review.
1.4 Provide settled
accommodation to
homeless households in the
private rented sector
Midlothian
Council,
Private
landlords
Ongoing 5% homeless
cases closed
after securing a
private rented
tenancy
35 Homeless
cases closed to
private let.
(revised from
10% of all
cases)
Yes – see
page 36/37
This reflects a slight
reduction in the number
of homeless households
who were able to secure
a private residential
tenancy (31 in 2021/22
compared to 55 in
2020/21) and a
significant increase in the
number of homeless
Page 241 of 340

Page 242

Page | 28 
households who secured
a Scottish Secure
Tenancy (373 in 2021/22
compared to 285 in
2020/21) along with the
challenges in securing
affordable private rented
accommodation detailed
in 4.7
1.5 Target open market
purchases for council
housing to areas and
property types in demand
from homeless households
Midlothian
Council
Ongoing 15 properties
purchased in
2021/22
12 Purchases in
2022/23 based
on SG funding.
SHIP
development
plan funding
Original RRTP target of
80 properties by 2023/24
has been achieved:
2018/19 – 39
2019/20 – 44
2020/21 – 14
2021/22 - 15
Total - 112
1.6 Reduce the average
number of weeks taken to
close a homeless case
Midlothian
Council
RSLs
By
2023/24
97.9 weeks to
close a
homeless
cases
Average 52
weeks to close
a homeless
cases
Existing
resources
Reducing from 118.1 in
2020/21. Midlothian
Council expects this to
remain relatively high in
2022/23 as those
households who have
been homeless for the
longest time are
rehoused through the
measures included in the
revised Housing
Allocation Policy.
1.7 No homeless household will
spend longer than 2 years
Midlothian
Council,
RSLs
By
2023/24
51 households
in temporary
accommodation
All households
in temporary
accommodation
Existing
resources
Reducing from 189 in
2019/20 and 52 in
2020/21
Page 242 of 340

Page 243

Page | 29 
in Temporary
Accommodation
longer than 2
years (on
31/3/2022)
for over 9
months will
have been
offered the
opportunity to
have the
property flipped
to permanent
housing, where
the property
type is suitable
for this to
happen. 
Outcome 2: Where temporary accommodation is required it is of good standard with access to effective support.
What Actions are planned Lead
Partners
Timescale Current
indicator
2021/22
Target indicator
2023/24
Resource
requirement
Comments
2.1 Ensure no breaches of the
Unsuitable Accommodation
Order
Midlothian
Council
Ongoing 0 0 Existing
resources 
2.2 Ensure adequate supply of
emergency accommodation
for households with
children and pregnant
persons by developing a
2nd project to replicate the
Mayfield Families Project.
Midlothian
Council
Complete N/A Two projects
established to
be used for
emergency
accommodation
for families.
Yes – see
page 36/37
Second project
operational in July 2021.
2.3 Convert Jarnac Court – an
existing office building
owned by Midlothian
Midlothian
Council
2021/22 N/A 22 units  Yes – see
page 36/37
Scheduled for
completion in June
2022.
Page 243 of 340

Page 244

Page | 30 
Council – into 22 short term
lets. 
2.4 Improve the turnover of
emergency family
accommodation by
reviewing internal working
practices and developing
appropriate performance
indicators
Midlothian
Council
Ongoing 34.9 days Families will
spend no longer
than 28 days in
emergency
accommodation
Yes – see
page 36/37
Reducing from 36 in
2020/21
2.5 Include a review of
temporary accommodation
rents as part of the next
rent setting strategy. 
Midlothian
Council,
tenant
groups
2022/23 Approval for
this work given
at Council
meeting in Feb
2021*
Revised rents in
place
Existing
resources
*Scheduled to be
completed during
2022/23
2.6 Complete a review of the
furnishings provided in
temporary accommodation
to ensure it is of a good
quality and meets the
needs of tenants
Midlothian
Council
Complete N/A N/A Existing
resources 
2.7 Following completion
Jarnac Court complete a
review of all supported
accommodation to make
sure it provides the
services and support
required
Midlothian
Council,
H+SC
Partnership
2022/23 N/A N/A Existing
resources 
2.8 Ensure all temporary
accommodation in
Midlothian meets the
Temporary Accommodation
Standards (expected to be
Midlothian
Council,
Third
Sector,
2023/24  All temporary
accommodation
meets the
published
standards  
Page 244 of 340

Page 245

Page | 31 
published by the Scottish
Government in 2022)
H+SC
Partnership
2.9 Ensure sufficient staffing
resources are in place to
manage temporary
accommodation effectively.
Midlothian
Council
Ongoing 0.5 FTE Officer
recruited to
manage shared
temporary
accommodation 
0.5 FTE Officer
recruited to
manage
emergency
accommodation
for families
Continual
review as
projects are
developed
Yes – see
page 36/37
This post is funded
through 2022/23.
2.10 Improve tenant satisfaction
with the quality of
temporary accommodation 
Midlothian
Council
By
2022/23
This data was
not collected
due to COVID
in 2021/22
85% Existing
resources 
Outcome 3: Homeless households with support needs are supported to access and sustain permanent accommodation
What Actions are planned Lead
Partners
Timescale Current
indicator
2021/22
Target indicator
2023/24
Resource
requirement
Comments
3.1 Ensure accommodation
and support is available
to those in crisis to
ensure no rough sleeping
Occurs in Midlothian
Midlothian
Council
Ongoing % of applicants
who slept rough
the night before
applying: 0%
% of applicants who
slept rough the night
before applying: 0%
Existing
resources 
3.2 Continue to deliver
Housing first beyond first
year pilot.
Midlothian
Council,
Ongoing 20 People
supported into
accommodation
20 new housing first
tenancies established
a year*
Yes – see
page 36/37
*20 properties during
2022/23. Number of
properties during
Page 245 of 340

Page 246

Page | 32 
H+SC
Partnership
during each of
the first two
years.
future years to be
confirmed following
full review.
3.3 Review resources
required to ensure
sufficient capacity to
provide effective support
to people in Housing First
tenancies
Midlothian
Council,
H+SC
Partnership
Complete Additional
staffing
resource
funded for
2022/23
All Housing First
tenants who require
support are provided
with this for as long
as they require.
Yes see
page *** 
3.4 Complete full review of
Housing First in
Midlothian with a view to
creating a long term
sustainable model of
delivery that can be
mainstreamed. 
Midlothian
Council
H+SC
Partnership 
2022/23  A long term model for
Housing First is in
place for 2023/24
Existing
resources
(Funding
model to be
confirmed) 
3.5 Develop an Equally Safe
Housing And Homeless
policy
Midlothian
Council 
Complete - - Existing
Resources
Approved by
Divisional
Management team in
November 2021 
3.6 Continue to support
improved health and
wellbeing outcomes for
homeless households
through the Health and
Homelessness Steering
Group
Midlothian
Council;
H+SC
Partnership,
NHS
Lothian
Ongoing - - Existing
resources 
3.7 Ensure compliance with
SHORE standards is
maintained.
Midlothian
Council,
H+SC
Partnership,
SPS
Ongoing Percentage of
people
identified as
having no
accommodation
Percentage of people
identified as having
no accommodation
available on release
are provided with
Existing
resources 
Page 246 of 340

Page 247

Page | 33 
available on
release are
provided with
accommodation
on release from
prison 100%
accommodation on
release from prison
100%
3.8 Support young homeless
people to develop the
skills required to
successfully sustain a
tenancy by delivering
training to obtain SQA
award.
Midlothian
Council
2022/23 Complete the
redesign of six
core modules
from the SQA
accredited
course
All young people will
be offered the
opportunity to
complete modules
appropriate to their
needs.
Existing
resources
*During 2022/23 roll
out of the Gaining
and Sustaining a
tenancy module as
an initial trial of the
revised course
materials to young
people in supported
accommodation.
3.9  Revise working practices
to ensure all individuals
seeking Housing Options
Advice/Homelessness
Assistance are provided
with a Personal Housing
Plan to ensure early
identification of support 
needs
Midlothian
Council
2022/23 - 100% of individuals
seeking Housing
Options
Advice/Homelessness
Assistance are
provided with a
Personal Housing
Plan
Existing
resources
*procedures will be
fully revised to reflect
changes enacted
following the
recommendations of
the Prevention
Review Group.
3.10 Develop and procure a
dedicated Youth
Prevention and Support
Service
Midlothian
Council
2022/23 - Youth homeless
support service in
place
Yes see
page 
Outcome 4: Housing options and support are in place to prevent homelessness
Page 247 of 340

Page 248

Page | 34 
What Actions are planned Lead
Partners
Timescale Current indicator
2021/22
Target indicator
2023/24
Resource
requirement
Comments
4.1 Reduce the number of
open homeless cases
Midlothian
Council,
RSLs
By
2023/24
630* 500 Existing
resources
*Exceeds original
target of 860 by
2023/24
4.2 Make better use of the
private rented sector by
increasing the number of
households given
assistance to access a
deposit. 
Midlothian
Council,
Private
Landlords
Ongoing 11 households
provided with
deposit assistance
45 Households
provided with
deposit assistance
Yes – see
page 36/37
Reflects the
challenges accessing
the private rented
sector described in
section 4.7
4.3 Continue to provide
housing education
courses in Midlothian
Secondary Schools
Midlothian
Council
Ongoing Not completed
during 2021/22
due to Covid-19
restrictions
All secondary
schools have
housing education
on curriculum
Existing
resources 
4.4 Ensure a person centred
approach is taken to the
delivery of all housing
options, homelessness
and tenancy management
functions by having a
trauma informed
workforce.
Midlothian
Council,
H+SC
Partnership,
NHS
Lothian
2022/23 Continued roll out
of training.
100% of
Homelessness,
Housing and
Temporary
accommodation
officers have
received trauma
informed training.
Existing
resource –
staff time to
attend ½ day
training
sessions.
Training will be
offered to all
Housing, Homeless
and Temporary
Accommodation
Officers as it is made
available by
Midlothian Health
and Social Care
Partnership.
4.5 Roll out of the Housing
Options Training tool kit
to all appropriate staff
teams
Midlothian
Council
Ongoing Monitoring
indicators to be
confirmed once
roll out of the tool
kit commences
All housing staff
have completed
HO tool kit training
Existing
resource –
Staff time
required to
complete 6
modules and
All Housing and
Homeless staff were
provided with access
to the tool kit at
launch in January
2022.
Page 248 of 340

Page 249

Page | 35 
to monitor
completion.
4.6 Continue work with the
Edinburgh, Lothian’s and
Border Housing Options
HUB to identify and share
best practice across the
region, and to ensure joint
working on homeless
prevention activates.
Housing
Hub
membership
areas.
Scottish
Government
Ongoing N/A N/A Existing
resource 
4.7 Reduce the number of
evictions from RSLs
following receipt of a
Section 11 notice. Liaise
with RSLs to develop joint
working protocols based
on the good practice
identified through the
North HUB. Develop a
recording and monitoring
framework to measure
the effectiveness of the
work
Midlothian
Council,
RSLs
2022/23 Monitoring
framework to be
developed in
2022/23
Reducing
percentage of
section 11 notices
that result in a
homeless
presentation.
Existing
resource 
4.8 Develop an improved
response to Section 11
Notices received from
private landlords and
mortgage lenders.
Develop a recording and
monitoring framework to
measure the
effectiveness of the work
Midlothian
Council
2022/23 Monitoring
framework to be
developed in
2022/23
Reducing
percentage of
section 11 notices
that result in a
homeless
presentation.
Existing
resource 
Page 249 of 340

Page 250

Page | 36 
4.9 Develop processes to
improve the response to
those at risk of being
evicted from Council
tenancies in Midlothian
Midlothian
Council
H+CP
Children
and
Families
Ongoing Monitoring
framework to be
developed*
Reducing number
of evictions that
result in a
homeless
presentation.
Existing
resource
*First meeting took
place in November
2022. Full evaluation
to be completed
during 2022/23
4.10 Develop a crisis
intervention fund to
prevent homelessness at
an early stage. Removing
risk of homelessness in
specific cases and testing
new solutions that do not
fit into existing pathways.
Midlothian
Council
Ongoing Launched in July
2022.
Reducing number
of Housing Advice
cases that result in
a homeless
presentation
Yes – see
page 36/37
Evaluation to be
completed in
2022/23
4.11 Develop pathways to
prevent homelessness for
groups who are
predictably at highest risk
of becoming homeless
including, ensuring
polices reflect the needs
of vulnerable groups:
 Women and
children
experiencing
domestic abuse. 
 Young people
 Individuals up to
the age of 26 who
were previously
looked after by the
local authority
Midlothian
Council
2023/24 - - Existing
resource 
Page 250 of 340

Page 251

Page | 37 
 Gypsy/travellers
 Individuals with a
history of offending
 Individuals
discharged from
hospital or other
institutions 
4.12 Develop partnership
working with internal
teams and third sector
support providers to
deliver more effective
responses across all
services. 
Midlothian
Council,
RSLs,
H+SC
Partnership,
Third Sector
Ongoing - - Existing
resource
Working practices
will be kept under
continued review to
ensure the needs of
service users are
met.
4.13 Monitor the effectiveness
of prevention activities as
set out in Single
Midlothian Plan.
Midlothian
Council
Ongoing 44% 55% Existing
resource 
4.14 Assess feasibility of
delivering/procuring a
mediation service
Midlothian
Council 
2022/23 - - Existing
resource –
Staff time to
complete
This will be included
as part of a wider
review of housing
support services.
4.15 Review Housing Advice
availability in the
Midlothian Council area
including:
 Review and
develop bite sized
housing options
leaflets
Midlothian
Council
Ongoing - - Existing
Resource –
Staff time to
complete 
Page 251 of 340

Page 252

Page | 38 
 Review housing
options content on
Midlothian Council
website
 Ensure housing
options advice is
accessible in a
variety of settings
i.e. libraries, GP
surgeries, Local
Job Centre Plus
4.16 Ensure staff from a
variety of partner
agencies have a basic
understanding of housing
options advice and
availability of other
services in Midlothian
through the delivery of
awareness sessions.
Midlothian
Council,
H+SC
Partnership 
Ongoing Number of
Housing/Homeless
Session delivered
in the year: 4
Number of
Housing/Homeless
Sessions delivered
per year: 4
Existing
resource 
4.17 Ensure Housing Advice
and Homelessness
services are sufficiently
resourced. Allowing
effective advice and
assistance to be
delivered.
Midlothian
Council,
H+SC
Partnership
Ongoing 1 additional
Homeless Officer
in place for 2
years
Officers have
manageable
caseloads that
allow effective
prevention work to
be completed.
Yes – see
page 36/37 
Page 252 of 340

Page 253

6. Resource plan
Table 13 provides an estimate of the funding required to deliver Midlothian
Council’s RRTP from 2022/23 through to 2023/24. Midlothian council is confident
it will be able to deliver the projects within these costs. However, to do so will
require additional resources to deliver the plan in full. For this reason, Midlothian
Council’s RRTP will be subject to continual review and, therefore possible
amendment. 
Table 13: Projected resources required by activity.
Activity Financial Year Total
2022/23 2023/24
RRTP –
Coordinator 0.5
FTE
£17,248 £17,248 £34,496
Housing First
Support 
£56,349 £56,349 £112.698
Housing First
co-ordinator
0.25 FTE
£8,624 £8,624 £17,248
Crisis
Intervention
Fund
£30,000 £30,000 £60,000
Private Rented
Deposit Scheme
£32,000 £32,000 £64,000
1 FTE
Homelessness
Officers (2 year
post)
£36,159* - £36,159
Temporary
accommodation
Officer- 0.5 FTE
(Emergency
Families
accommodation)
£17,248* - £17,248
Temporary
Accommodation
Officer – 0.5
FTE ( Shared
Accommodation)
£17,248* - £17,248
Emergency
Accommodation
(Families) –
Support staff
£50,207 £50,207 £100,414
Housing
Education (SQA)
£11,498 £11,498 £22,996
Page 253 of 340

Page 254

1 
0.33 FTE
Housing
Education
(Schools
Programme)
0.33 FTE
£11,498 £11,498 £22,996
Housing Options
Training Toolkit
£857.24 £757.48 £1,614.72 
Development of
Jarnac Court
£415,207 - £415,207
Youth
Prevention and
Housing Support
Service
£200,000 - £200,000
Total £689,267.24 
£218,181.48 £907,448.72 
7. Monitoring, Equalities and Consultation
Midlothian Council provides opportunities for consultation and engagement with
tenants and other service users. If you have any comments or queries on the content
of this document, please contact the Housing Planning & Performance Section at
Midlothian Council for more information. 
Matthew McGlone
Housing Options Development Officer
Customer and Housing Services
Midlothian Council 
Midlothian House
40-46 Buccleuch Street 
Dalkeith 
EH22 1DN
matthew.mcglone@midlothian.gov.uk 
Midlothian Council is committed to ensuring equality of opportunity and combating
discrimination through a series of equal opportunities and anti-discriminatory
policies. The Council has embedded equalities principles into strategic planning as
well as service delivery. Housing policies and services are regularly monitored,
reviewed and reported on to ensure that they comply with equalities requirements. 
Midlothian Council carried out an Integrated Impact Assessment when publishing its
original Rapid Rehousing Transition Plan to ensure that the needs of all equality
strands were considered. This has been reviewed in June 2022. Additional
Integrated Impact Assessments have been completed for individual activities. These
assessments found no evidence that any direct discrimination will arise from any of
the activities. Where relevant Midlothian Council has continued to consult with
tenants and service users when developing activities related to this plan. 
Page 254 of 340

Page 255

2 
Appendix 1: Midlothian Council RRTP 2021/22 Activities and Spend Report 
Details of funding recipient 
Local Authority Midlothian Council
Reporting Period 01/04/2021 to 31/03/2022
DD/MM/YYYY  DD/MM/YYYY
Reporting Officer Matthew McGlone
Position Housing Options Development
Officer
Date Completed 08/06/2022 
Total RRTP Funding
carried over from
2020/21
£15,699 (2019/20 EHT
Fund)
£125,650 (2020/21 EHT
Fund)
£85,000 (Winter
Support Fund) 
RRTP Funding
received for 2021/22 
£127,000 
Page 255 of 340

Page 256

3 
2021/22 Activity 
Activity Name: Emergency accommodation for Families
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
These projects provide emergency, 1st stop
accommodation to homeless applicants with either
dependent children or a pregnant person in the household.
The properties provide self-contained, fully furnished
accommodation removing the need for this group to be
placed in unsuitable accommodation. 
Properties are staffed by a full time support worker and a
part time concierge/caretaker. 
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
£77,298.96
(£58,578 2019/20
EHT fund
£18,720.96 2020/21
EHT fund)
35,133.48
(2019/20) -
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
The first property in the Mayfield area became fully
operational in July 2020, providing accommodation for up
to 8 families. A review of the furnishings in 2021 ensured all
flats in at this project are now able to accommodate
households with up to three children.
A second property in the Gorebridge area was completed
in July 2021. Providing an additional four flats to be used
as this type of accommodation, including two which can
accommodate households with up to four children. The
cost of delivering the second project was significantly
reduced as Midlothian Council was able to identify a block
of flats in which all properties were due to be vacated in a
short period of time. 
Page 256 of 340

Page 257

4 
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
During 2020/21 41 Households were provided with
accommodation at the Mayfield project. A further 80
households were provided with accommodation in 2021/22
(60 at Mayfield and 20 at Gorebridge).
This project has partially contributed to ending the use of
bed and breakfast accommodation provided by third party
contractors. The total savings realised by ending the use of
this accommodation is £526,930 per annum, this was
achieved through a combination of projects including this
one. 
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
These projects are managed by Midlothian Council with on-
site support provided by a dedicated support provider.
Support needs of households provided with this type of
emergency accommodation can be identified more quickly
than in the B&B type accommodation previously used.
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other
- - -
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
Both these projects are now fully operational. 
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
These projects will continue on a long term basis and
funded through a combination of savings made by no
longer using accommodation provided by a third party, and
the service charge applied to the accommodation.
The 0.5 FTE temporary accommodation officer responsible
for the management of these properties is in post until the
end of 2022/23. 
The provision of on-site support forms part of a larger
contract which provides a support service to all of
Midlothian Councils supported accommodation. This
contract is also in place until the end of 2022/23. Decisions
Page 257 of 340

Page 258

5 
relating to future service provision will be included as part
of any review of this contract. 
2021/22 Activity 
Activity Name: End the use of B&B accommodation – Develop shared
temporary accommodation
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
As an alternative to unsuitable bed and breakfast
accommodation, shared temporary accommodation
provides accommodation to two homeless households. The
accommodation is available to single person and couple
households, each provided with the own bedroom while
sharing kitchen, bathroom and living areas. The
accommodation provided is a more affordable option for
households who are in employment. For those not in
employment, access to employment, training, and
education are also improved.
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
£58,578
(2019/20 EHT
Funding)
£ 103,253.93
(2020/21) -
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
Midlothian Council ended its use of B&B type
accommodation provided by third party contractors in
November 2020. Shared temporary accommodation has
continued to be used. The plans contained in the original
RRTP were to develop 20 properties to provide
accommodation for up to 40 households. During the initial
stages of the COVID-19 pandemic this was increased to 33
properties to accommodate up to 66 households. Ensuring
sufficient capacity for all those in B&B type accommodation
plus additional capacity to meet the increased demand for
temporary accommodation at the time. 
Page 258 of 340

Page 259

6 
At the end of March 2022 21 properties were being used to
provide this type of temporary accommodation.
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
As some residents have been permanently housed, some
of those remaining in the shared temporary
accommodation have been offered the opportunity to have
the property converted to a permanent Scottish Secure
Tenancy. Two people have benefited from this opportunity
so far, others will be considered as appropriate
opportunities arise.
Some of the financial savings realised from end the use of
B&B type accommodation have been used to fund other
RRTP prevention focused activities.
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
This project is managed by Midlothian Councils Homeless
& Temporary Accommodation teams.
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other
- - -
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
The need/demand for temporary accommodation of this
nature will be reviewed throughout 2022/23 and future
years to ensure sufficient supply.
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
To ensure this project can be mainstreamed the service
charge for the accommodation will cover the cost of
furnishings, cleaning and staffing. 
We anticipate other RRTP activities such as revisions to
the Allocations Policy, the flipping of temporary and
homeless prevention activities will result in fewer
households requiring temporary accommodation, and a
reduction in the time spent in temporary accommodation.
As this happens the amount of temporary accommodation
stock will be reduced. 
Page 259 of 340

Page 260

7 
2021/22 Activity 
Activity Name: Housing Allocations Policy review/implementation –
Allowing people to remain in their temporary housing
as a settled option.
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
Households who have been in temporary accommodation
for the longest time will be given the opportunity to remain
in the accommodation on a permanent basis. This reduces
the number of moves households are required to make
before being permanently housed. 
Over time this will result in a reduction in the time spent in
temporary accommodation. In the initial stages the average
time in accommodation and time to close a homeless
cases will increase when reported through HL1 and HL3 as
those who have been in their accommodation the longest
secure permanent accommodation in this way.
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
- - -
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
During 2021/22 48 households had their temporary
accommodation converted to a Scottish Secure Tenancy in
this way. 
In 2020/21 51 people had their accommodation converted
in this way, resulting in the number of people in temporary
accommodation for over two years reducing from 189 on
31st March 2019 to 52 on 31st March 2021.
As of 31st March 2021 51 households had been in their
temporary accommodation for over two years. All of these
households have either been offered and declined the
opportunity to convert their accommodation in this way, or
were in accommodation that was not suitable to be ‘flipped’
Page 260 of 340

Page 261

8 
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
Since commencing this initiative 99 households have
benefited from having their accommodation converted in
this way. 
This along with other activities this has contributed the
overall reduction in open homeless cases at the end of the
year (802 – 2020/21 reducing to 630 – 2021/22)
Converting properties in this way reduces the overall
number of void properties and the costs associated with
this, including, void rent loss, repairs and general
maintenance.
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
This project is managed by Housing Services and
Temporary Accommodation. 
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other
- - -
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
The decision to offer households the opportunity of
converting temporary accommodation to settled
accommodation in this way will continue on a cases by
case basis. With those who have been in their
accommodation for the longest time considered first.
People who decline the opportunity to have their
accommodation converted in this way will not be penalised
and still be made an offer of permanent housing under
Homeless Legislation
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
This activity has been mainstreamed from implementation. 
2021/22 Activity 
Page 261 of 340

Page 262

9 
Activity Name: Housing Allocation Policy review/implementation –
increasing the number of void properties offered to
homeless households.
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
The amendments made to the Housing Allocations Policy
aim to ensure homeless households are able to access
settled accommodation as soon as possible, and to
minimise the time spent in unsuitable accommodation. The
percentage of Council properties allocated to those on the
Homeless List increased from 45% to 60%. On
Implementation all homeless households were required to
choose all house types, and as a minimum at select at
least two of the six areas which have a significant number
of available properties.
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
- - -
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
During 2021/22, 205 void properties were allocated
homeless households by Midlothian Council. When
combined with the 48 temporary accommodation properties
converted 58.7% of all lets in Midlothian were to homeless
households, increasing from 54% in 2020/21.
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
This activity combined with other measures introduced in
the Housing Allocations Policy and RRTP activities has
contributed to the number of homeless cases reducing from
802 on 31/3/2021 to 630 on 31/3/2022. Further evidence of
the positive impact being made is shown in the average
homeless case duration reducing from 118 weeks in
2020/21 to 98 weeks in 2021/22
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
This activity is managed by Midlothian Councils Housing
Services Team. 
SG RRTP Funding Local Authority funding Other
Page 262 of 340

Page 263

10 
Future spend planned on
this activity in 2022/23:  £ - - -
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
Midlothian Council will monitor the number of properties
allocated to homeless households throughout 2021/22 to
ensure the targets set out in the Housing Allocations Policy
are met. To further reduce the overall number of homeless
cases.
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
This activity has been mainstreamed from implementation.
It will be kept under frequent review to monitor progress. 
2021/22 Activity 
Activity Name: Target open market purchases for Council Housing to
areas and house types in high demand from homeless
applicants.
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
To increase the availability of council housing in areas
where there is the greatest shortfall in meeting the demand.
These properties are allocated to homeless applicants. 
This helps reduce the time taken for applicants to be
housed in areas/property types where they may be waiting
longer for secure housing. 
This activity is funded by Midlothian Council along with an
additional grant subsidy from the Scottish Government
More Homes Division.
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
- £7,277,935.42 £2,677,420
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
In 2021/22 15 properties were purchased through the open
housing market in this way. 
In total Midlothian Council has purchased 112 properties in
this way (2018/19 – 39, 2019/20 – 44, 2020/21 – 14,
Page 263 of 340

Page 264

11 
2021/22 – 15) Exceeding the original target of purchasing
80 properties by 2023/24 in 2019/20.
The properties purchased in 2021/22 were funded in the
following way, £1.691m Midlothian Council, £0.517 Scottish
Government (More Homes Division)
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
As a result of this activity 112 homeless households have
been able to secure permanent housing in an area selected
on their housing application.
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
This project is managed by Midlothian Councils, Housing
Strategy and Housing Services Teams.
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other
- £2,310,000 £685,714
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
Midlothian Council aims to purchase a further 12 properties
to be allocated in this way during 2022/23. 
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
This activity will be reviewed on an on-going basis.
Decisions on the number of properties to be purchased will
be based on the current housing demand and availability of
accommodation in each locality. 
2021/22 Activity 
Activity Name: Ending the use of Bed and Breakfast accommodation:
convert Jarnac Court, an existing office building
owned by Midlothian Council, into 22 short term
temporary accommodation units.
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
Jarnac court will provide accommodation for 36 people
facing emergency homelessness.
The former Dalkeith office space now boasts 22 bedrooms,
of which 14 are doubles, some with en suites, two fully
Page 264 of 340

Page 265

12 
fitted kitchens, two communal living areas, offices/meeting
rooms, bathrooms and laundry facilities. 
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
-
£1,644,793.00
(£75,000 in
2019/20,
£56,000 in
2020/21,
£1,513,793.45
in 2021/22)
-
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
The initial project proposals were approved in 2018. During
2019, it became apparent that additional repairs would be
required to the building, in addition to the original repair
work. Additional work was also identified to ensure building
standards will be met, reflecting the change of use from
commercial to residential. 
The revised plans and proposed budget were approved by
Midlothian Council in December 2019 following which a
contractor was appointed to complete the required works.
Building works are now scheduled to be completed during
Spring 2022 with the project becoming operational in late
spring/early summer.
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
The impact of this activity will be assessed throughout
2022/23.
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
The accommodation will be managed by Midlothian
Councils temporary accommodation team.
Residents will have 24 hours access to on-site housing
support.
Page 265 of 340

Page 266

13 
Services from Midlothian Health and Social Partnership,
including mental health and substance misuse teams, will
also provide specialist support on-site. This will ensure
people are able to have support needs assessed quickly
and receive the support required.
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other
- £415,207 -
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
The building is scheduled to be handed over to Midlothian
Councils temporary accommodation team in June 2022,
with the first residents moving in over the following weeks. 
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
It is proposed for the building to be used as supported
accommodation for a minimum of five years. As the impact
of RRTP projects aimed at reducing the time spent in
temporary accommodation, and re-housing legacy cases is
realised, the amount and type of accommodation provided
in Midlothian will be reviewed. 
2021/22 Activity 
Activity Name: Homeless Prevention Fund
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
The homeless prevention fund is a small scale resource
available to front line staff to prevent homelessness, or the
need for temporary accommodation from occurring.
This project has been funded through the savings made
from Midlothian Council ended its use of B&B type
accommodation provided by external contractors.
The fund was launched on 26th July 2021 
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
- £30,000 -
Page 266 of 340

Page 267

14 
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
After received approval from Midlothian Council in May
2021 the fund was launched in July 2021. A budget of
£30,000 was allocated to the prevention fund for 2021/22,
utilising savings made from ending the use of B&B type
accommodation.
The due to the nature of presentations and limited
availability of accommodation in the private rented sector
during this time A total of £3060.09 was award to assist 4
households between July 2021 and March 2022. 
The Scottish Government Covid Tenant Grant Fund was
successfully implemented in Midlothian, further reducing
the number of people who may otherwise have required
assistance from the Prevention Fund.
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
Examples of positive outcomes from use of the fund
include, providing assistance with the first month’s rent to
enable people to secure a private rented tenancy, removing
the need to access temporary accommodation and
potentially multiple moves before finding settled
accommodation. 
Others have been provided with help to maintain their
tenancy while in custody for a short period using the fund to
pay rent for a short period. This helps to ensure
accommodation is available upon release preventing
further homelessness, while also removing additional costs
for the council associated with void rent loss and repairs. 
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
The Homeless Prevention Fund is managed by Midlothian
Council’s Homeless Team. Where relevant Officers
negotiate with landlords to prevent action that would lead to
eviction being escalated. Officers work in partnership with
other agencies and the third sector to ensure support is in
place to ensure longer term tenancy sustainment. 
SG RRTP Funding Local Authority funding Other
Page 267 of 340

Page 268

15 
Future spend planned on
this activity in 2022/23:  £ - £30,000 -
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
This project will continue for 2022/23 with the same budget
allocation. 
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
Midlothian Council approved this project as a two year trial.
A review of the initiative will be completed at the end of this
period. 
2021/22 Activity 
Activity Name: Improving access to the private rented sector
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
Since the introduction of the Private Residential Tenancy in
December 2017, Midlothian Council has made good use of
this sector as a permanent housing option for homeless
households.
In April 2021 it was agreed to increase this budget from
£16,000 to £32,000 in order to provide more assistance.
This increase was funded through the savings made as a
result of Midlothian Council ending its use of B&B
accommodation provided by third party contractors.
In addition to assisting households who have been
assessed being homeless or a risk of homelessness within
the next 56 days, assistance is now also provided to
households seeking general housing advice. This is to
further prevent the risk of people becoming homeless and
potentially needing costly temporary accommodation.
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
- £32,000 -
Page 268 of 340

Page 269

16 
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
During 2021/22 11 households were provided with
assistance to access a deposit enabling them to secure a
private residential tenancy. 
Throughout 2021/22 frontline officers have reported a
reduction in the availability of private rented
accommodation where the rent is within LHA rates. In
addition to this it is reported the ‘competition’ for available
properties has also increased with a significant increase in
the number of people stating an interest in properties.
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
The activity assists people to access accommodation in the
private rented sector who would otherwise be unable to do
so. This helps to ensure homeless people and those at risk
of becoming homeless in Midlothian have access as wider
range of housing options as possible. 
People are able to access secure accommodation
removing the need for multiple moves and the need for
often costly temporary accommodation.
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
This activity is managed by Midlothian Councils
Homelessness team. Officers work directly with landlords
to help people unable to source a deposit access the
private rented sector. Officers work in partnership with
other agencies/services to ensure support is in place,
where required, to maximise tenancy sustainment. 
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other
- £32,000 -
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
This activity will continue in 2022/23, with the same
increased budget. Officers will continue to work with local
landlords and letting agencies to help households access
the private rented sector where this is a suitable housing
option that they wish to consider.
Page 269 of 340

Page 270

17 
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
This activity is already mainstreamed. The budget allocated
to the activity will continue to be reviewed on an annual
basis. 
2021/22 Activity 
Activity Name: Sustainable Housing on Release for Everyone (SHORE)
Standards
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
In November 2019, Midlothian Council’s Community Safety
and Justice Partnerships established a multi-disciplinary
group to work to work in partnership in the provision of
supporting people returning to the community after serving
a custodial sentence. 
Housing and homeless work with this group to help prevent
people losing their accommodation, and where required
ensure suitable accommodation is identified ahead of
liberation.
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
- - -
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
The multi-multidisciplinary group has continued to meet on
a fortnightly basis throughout 2020/21. Ensuring support
plans are in place to help people leaving prison to address
other, often complex, needs. All support is delivered from a
trauma informed perspective. 
The Community Safety and Justice Partnership fund an
additional two workers from third sector organisations as
part of this project.
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
As a result of this activity suitable accommodation has
been identified for all those who require this ahead of their
release from prison. The additional support provided
ensures people are able to access welfare benefits quickly,
Page 270 of 340

Page 271

18 
receive support to address wider needs and where
appropriate access training, education or employment.
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
A partnership approach is taken to the delivery of this
activity. Agencies/services who participate in the fortnightly
meetings include, justice, mental health, substance misuse,
third sector, children and families, and
housing/homelessness. During 2021/22 this group has
been expanded to include Skills Development Scotland,
Communities and Lifelong Learning, and Department for
Work and Pensions.
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other
- - -
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
This activity will continue during 2022/23. 
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
Midlothian Councils Community Safety and Justice
Partnership will continue to review this activity to ensure
adherence to the SHORE standards. 
2021/22 Activity 
Activity Name: Revised nominations agreement with East and
Midlothian Womens Aid
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
This agreement with Womens Aid aims to provide those
experiencing domestic abuse with settled accommodation
as a first option. This removes the need to make a
homeless application, and possible moves to temporary
accommodation
SG RRTP funding Local Authority funding Other
Page 271 of 340

Page 272

19 
Allocation Spent on
activity:  £ - - -
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
An updated nominations agreement was confirmed in
August 2020. 
This committed to providing a minimum of four properties to
be used in this way each year. 
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
Those provided with housing in this way have been able to
quickly settle into their new tenancy knowing the need for
short term moves to temporary accommodation has been
removed. East and Midlothian Women’s Aid provide
support for a minimum of six months including assistance
to register with GP, Schools etc. help to settle in the
community and emotional support to both women and
children.
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
This initiative is jointly facilitated by Midlothian Council and
East and Midlothian Women’s Aid.
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other
- - -
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
This agreement will be continued throughout 2022/23. The
number of properties allocated will be continue to be
monitored locally. 
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
This activity has been mainstreamed from implementation 
Page 272 of 340

Page 273

20 
2021/22 Activity 
Activity Name: Midlothian House Project
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
Midlothian Housing Project is a Local House Project, to
help young people leaving care to create their own home
and live independently in the community.
The project is co-designed with young people who work
together to develop relationships and learn skills that
enable them to live successful adult lives. 
The project receives support from the Life Changes Trust
Foundation, matched with a financial commitment by
Midlothian Council.
Young people are also supported to develop and
participate in peer support groups throughout the time they
are working with the project. 
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
- £420,646 £250,323
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
20 care experienced people are participating in the wider
activities provided by the project. 11 have successfully
moved into their own permanent tenancy and a further two
are waiting to be allocation permanent housing. 
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
11 young people have been provided with a permanent
tenancy.
16 of the young people are either in active
training/education or employment. 
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
LA partners: Children and Families, Adult Services, Justice
Team, Substance Misuse Service. 
Page 273 of 340

Page 274

21 
Third sector organisations include: Connect Scotland, Fast
Forward, and Health in Mind.
Connections have also be established with Edinburgh
Collage and Communities and Lifelong Learning.
Midlothian Council Housing Services have committed to
provide six properties per year, with local Housing
Associations providing four per year.
Joint working between Housing Services and project staff
has continued to raise care experience awareness and
trauma informed practice.
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other
- - -
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
During 2022/23 work will continue to support those from the
first cohort to successfully sustain their tenancy and live
independently in the community. During this period it is
hoped all of those from the second cohort will be provided
with a permanent tenancy. 
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
This project has been funded for an initial three year
period. Children and Families will be responsible for
conducting reviews and taking decisions regarding future
funded etc. 
2021/22 Activity 
Activity Name: Homeless Prevention Forum – early intervention to
prevent evictions due to rent arrears
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
The Homeless Prevention Forum has been established to
ensure a person centred approach is taken to prevent
evictions from Midlothian Council tenancies due to rent
arrears.
Page 274 of 340

Page 275

22 
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
- - -
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
After developing joint working agreements and the aims
and scope of the meetings, the Homeless Prevention
Forum met for the first time on 30th September 2021. Initial
expectations were around 10 Midlothian Council tenants at
risk of eviction due to rent arrears would be discussed at
each meeting.
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
A review of the first three meetings took place in February
2022. This found that 30 households had been referred to
the forum (all as a result of arrears). In 25 cases there it
was evidenced that the multi-agency approach and actions
taken by the forum have prevented homelessness. 
There is evidence that many of the households discussed
at the forum have actively engaged with the support offered
to address their rent arrears. Court action is continuing for
the few cases who have not engaged with the support
offered so far. Attempts to provide support those
households and prevent homelessness will continue.
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
The forum brings together senior members of staff from a
variety of teams including, Homelessness, Housing
Services, Arrears, Children and Families, and Housing
Support. 
Services take a person centred approach to each person
discussed to identify actions to be taken to resolve/reduce
the arrears and prevent enforcement action from being
escalated.
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other
- - -
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23.
This activity will continue during 2022/23 to prevent
homeless resulting from rent arrears. It is recognised that
Page 275 of 340

Page 276

23 
this type of activity may become more important over the
comings months as the impact of the rising cost of living
begins to be realised.
Although no cases have been referred so far the scope of
the forum has been widened to include tenants who are
risk of eviction due to anti-social behaviour.
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
After evaluation and success of the first three meeting it
was decided to mainstream this activity.
Processes will be kept under regular review to ensure the
intended outcomes are achieved. 
Housing First Progress 
Housing First Progress:
Provide a short overview of progress to
date in developing and implementing
Housing First in your local authority
area. 
During 2019/20 Midlothian Council developed a model of
delivering housing first, including the procurement of a
dedicated Housing First Support Provider. Following a
short delay due to COVID-19 Midlothian Council launched
Housing Frist on 1st June 2020. 
Throughout the development of Housing First a partnership
working approach has been taken to ensure those
accepted are provided with wrap-around support specific to
their own individual needs.
These partnership working arrangements have been
reviewed at frequent intervals, particularly in the first year
‘pilot’.
Housing First Tenancies 
Provide an overview of how many Housing
First tenancies have started area and the
plans for scaling up Housing First in future
years. Also provide the average support cost
of each Housing First tenancy. 
Since launch 34 people have been accepted for Housing
First in Midlothian up to 31st March 2022. During the first
two years of Housing First 40 people will have been
accepted. A further 20 Housing First tenancies will be in the
third year. 
Page 276 of 340

Page 277

24 
Up to 31st March 2021 the average known cost of
supporting each Housing First tenancy was £2,365.18. This
does not include the significant resources committed to
delivering Housing First and providing support to tenants by
partner services/agencies that are met from existing
budgets.
Housing First Furniture
Packages 
Provide an overview of any furniture
packages you provide to each Housing First
tenancy, including an average cost of
furniture packages and how they are funded. 
Those accepted for Housing First in Midlothian are
supported to apply for furnishings from the Scottish Welfare
fund. The items provided are assessed on an individual
basis by Midlothian Councils Revenues and Benefits team,
in line with existing Scottish Welfare Fund guidance. The
average award for those accepted for Housing First to date
is £1364.37.
Those accepted for housing first are also supported to
apply for additional assistance to furnish/decorate the
accommodation from a variety of other funds. These
applications are made on an individual basis according the
needs/wishes of the individual.
Some Housing Frist tenants have also been eligible for a
Leaving Care Grant.
Housing First Partners 
Provide detail of all Housing First partners
who are supporting the delivery of Housing
First. 
The Housing First support service in Midlothian is provided
by WithYOU. Administrative functions are completed by a
0.25 FTE member of staff from Customer and Housing
Services. Ongoing tenancy management is provided
through existing resources within Housing Services. 
The following agencies/services work in partnership to
provide additional, non-housing support and or contribute
to the processes relating to the identification and selection
of homeless people suitable for Housing First; Joint Mental
Health Team, Substance Misuse Service, Justice Social
Work, Children and Families, Spring Service, Change Grow
Live, East and Midlothian Womens Aid, Domestic Abuse
Service, Revenues, DWP.
Page 277 of 340

Page 278

25 
Allocation Spent on
Housing First: 
£
SG RRTP funding Local Authority funding Other
£ 80,416
(£32,000
development
fund, £23,844 
2019/20 EHT
fund, £24,572
2020/21 EHT
fund)
- -
Impact of Housing First:
Evidence of the impact of Housing First,
including any financial saving and
savings identified by other public bodies
if it has been measured. 
There have been many positive outcomes for people
accepted for Housing First in Midlothian including examples
of people being able to enter employment, people
reducing/stabilising their substance misuse, people not re-
entering the justice system, people being able to have
meaningful, including overnight, access to children. 
The wider savings by other public bodies has not be
calculated.
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other
£56,349
(£19,303.34
2020/21 EHT
fund,
£37,245.66
2021/22 EHT
fund)
- -
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for Housing First during
2022/23. 
Midlothian Council has committed to continuing Housing
First on the same basis for a third year. This is with an
increased staffing resource to reflect the increased
numbers of people receiving support from the service. This
will see up to another 20 people being offered a Housing
First tenancy.
Page 278 of 340

Page 279

26 
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream. 
In the second half of 2022/23 a full review of Housing First
in Midlothian will be completed. Learning from the
experiences of the project so far, and the feedback
received from Homeless Network Scotland through the
check-up process. This will inform decisions about how
Housing First will operate on a longer term basis in
Midlothian. 
Unspent RRTP Funding 
Please provide the total
RRTP funding provided by
the Scottish Government for
the implementation of the
Rapid Rehousing Transition
Plan in your area that has
not been spent to date. 
£
£174,754.34 (£47,754.34 2021/22
winter boost, £127,000,000 2021/22
EHT grant fund) 
Provide detail of how this funding will be spent on implementing the Rapid
Rehousing Transition Plan in 2022/23 detailing the area that it will be used in. 
Please make clear the individual amounts 
ACTIVITY
FUNDING TO BE
CARRIED FORWARD
Youth homeless prevention and support  £ £174,754.34 
£  
£  
£  
£  
Page 279 of 340

Page 280

Page 280 of 340

Page 281

Homeless Network Scotland  
Charity Registered in Scotland (SC0 03453) and Company Limited by Guarantee (SC112361)
Registered Office at Unit 16a, Adelphi Centre 
12 Commercial Road, Glasgow G5 0PQ 
Chief Executive: Margaret-Ann Brünjes 
Contact Us
T: 0141 420 7272 
hello@homelessnetwork.scot
w: homelessnetwork.scot 
Housing First Scotland Annual Check-Up
Final Report Midlothian 
Check-up completed: 24/05/2022 
Item 8.13
Page 281 of 340

Page 282

2 
Thank you. 
Thank you for participating so fully in the annual check-up process for Housing First.
Housing First means ordinary, settled housing as a first response for people whose
homelessness is made harder by experiences such as trauma, addiction, and mental
health problems. Combined with flexible, person-centred and open-ended support, it
centres safety, choice and peace of mind.
Housing First is branching out across Scotland. From the initial pilots and pathfinder, 24
of 32 local authority areas are now putting Housing First. While the highest demand is in
urban areas, all 32 councils in Scotland have people who could thrive with Housing First.
Homeless Network Scotland and Scottish Government are facilitating this annual check-up.
In this first year, 13 local authorities are participating (those having at least 1 year of
delivery, and not being involved in the pathfinder). We will report separately on emerging
themes, great ideas and learning points across all areas.
In this local report we summarise your strengths and successes and the shared
commitments explored for the year ahead. And we also leave you with a deliberate
provocation from the expert who joined your sounding board!
Home is the best base to build and live our lives. Housing First is normal, its fairer, it
works – and we all benefit. 
Page 282 of 340

Page 283

3 
Method
 We facilitated Housing First Connect, an online event for all partners involved in Housing
First across each of the local authority areas that make up the East Housing Options Hub. 
 We invited the local authority lead and key partners to complete the Self-Reflection Tool.
Five self-reflection scores were returned. 
 We will be inviting new tenants to tell us what they think about Housing First by responding
to a short text survey. We will be in touch about this shortly.   
 We submitted an interim Messages that Matter report to the local authority lead and
partners, based on the combined insights we gathered from people, the scores from the
self-reflection tool and the quarterly monitoring data supplied to the Scottish Government. 
 We faciliated a Sounding Board with the local authority lead and a small roundtable of your
nominated partners to explore the messages that matter. This was also attended by an
expert on Housing First from outside Scotland, Alex Smith, Senior Project Manager leading
Housing First England, Homeless Link. 
Measure
Heriot-Watt university estimates that around 3,560 Housing First tenancies per year, over a 10-year
programme, would meet demand from people already in the homelessness system and those
forecast to be best-fit for Housing First over the same period. This is generally higher than local
forecasts and not linked to the local factors that will influence how fast Housing First can scale up
across the area. The number of Housing First tenancies started in Midlothian is 31 as of March 2022.   
Page 283 of 340

Page 284

4 
Strengths and successes
Midlothian partners were able to clearly demonstrate several foundations that were strong and
developments that were inspiring. This includes: 
 A different approach to allocations; Midlothian identify void properties and allocate them
directly to Housing First at a rate of two per month to overcome issues with housing supply. 
 “Flipping” temporary tenancies to Scottish Secure Tenancies in line with the desires of the
tenant and taking action to ensure that no one waits longer to secure a tenancy through
Housing First than those on other housing waiting lists. 
 Offering a furnished property has contributed to the success of tenancies and has evolved
the thinking in the local authority that all properties ought to be furnished for people
recovering from a period of homelessness. 
 The support provided to tenants is of good quality and flexible, support providers work in
partnership with housing providers to ensure support is timely when issues arise with the
property. 
Commitments and considerations 
Midlothian partners are exploring the following developments for the year ahead: 
 A robust and inclusive commissioning approach can ensure that the delivery of Housing First
is commissioned against, and therefore tied to, the principles of Housing First. Consultation
during 2022-23 will help develop a commissioning and cost model for Housing First in
Scotland that protects low caseloads and the capacity of support workers. 
 The long-term approach to funding Housing First is to build it into a range of frameworks, to
join up approaches and avoid long-term duplication of services. A shared funding approach,
especially with health and social care partnerships and community justice, acknowledges
the shared cost-benefits of Housing First. 
 Creating a partnership with Scottish Welfare Fund to allow funds to be released more
quickly for Housing First tenants, learning from other Housing First partnerships and their
agreements with SWF. 
 Scope options for colocation of staff to encourage stronger partnerships with specialist
support services such as mental health and addictions services. 
 Work towards a caseload of seven tenants per Housing First worker, bringing the delivery in
line with the Housing First principles
Page 284 of 340

Page 285

5 
Experts’ provocation…
In other areas, teams are rigid in adhering to the recommended maximum caseloads and have
developed some “non-negotiables” to sit alongside the Housing First principles, with caseload
being one. Midlothian should consider the maximum caseload a non-negotiable factor and bring
the delivery in line with the principles. 
Housing First – the help.
Whether you are planning, commissioning or delivering Housing First support – there is help
on hand. Find out more about the tools and time available for you at www.housingfirst.scot
including ‘Branching Out’ - the National Framework for Housing First. 
Page 285 of 340

Page 286

Page 286 of 340

Page 287

Midlothian Council
23 August 2022 
Title of Report Trauma Informed practice development in Midlothian 
Report by Nick Clater (Head of Adult Services) 
Report for Information 
1 Recommendations 
Council is recommended to note the report. 
2 Purpose of Report/Executive Summary 
This is an information report providing an update on the development of
trauma informed practice in Midlothian. 
Date 2 August 2022 
Report Contact: Nick Clater (Head of Adult Services)   
0131-271-3402
nick.clater@midlothian.gov.uk 
Item 8.14
Page 287 of 340

Page 288

2
3 Background/Main Body of Report 
In Midlothian Council, we are committed to creating a culture that is
trauma informed. The vision is for a whole system, multi-level approach
to workforce training and development. 
Leaders in Midlothian Community Planning Partnership, including
service areas within both Midlothian Council and Midlothian HSCP,
identified that an understanding was required by the workforce of
trauma, adversity and its impact on health, learning and wellbeing. The
‘workforce’ referred to is multi-agency, and includes a range of roles –
from receptionist in universal services to clinical specialists across the
lifespan. 
A brief scoping exercise identified gaps in Trauma Informed Practice
training for people in client-facing roles across Midlothian. Staff in a
wide range of Council services all expressed a desire for their practice
to be better trauma informed.
In September 2019 a bid to NHS Education for Scotland (NES) from
Midlothian HSCP was successful and Midlothian was allocated £40,000
to deliver Trauma Training to the Midlothian workforce. The training
model proposed was an open access one. The aim was to provide: 
➢ Level 1 (Trauma Informed) Training to 400 frontline workers and
volunteers in a range of public facing Services 
➢ Level 2 (Trauma Skilled) Training to 110 people, initially focusing on
the services and partner agencies associated with the new
Recovery Hub, Number 11. 
➢ Level 3 (Trauma Enhanced) Training was to be provided by the
local TIPTICs. 
➢ To ensure full engagement and ongoing sustainability, key leaders
and managers would be expected to attend Scottish Trauma
Informed Leadership Training (STILT) which was provided by NES.
This was to ensure that they had a good understanding of the
Transforming Psychological Trauma agenda and their
responsibilities in supporting staff to undertake training and
implement learning in their day to day work. 
➢ To build on existing good practice of staff supervision and to
support local service areas to embed this within their practice as
appropriate to the staff group 
This pilot project is now complete with 359 people trained at level 1 and
107 people at level 2 which was very close to the target set. An
evaluation report has been compiled with 6 recommendations and
forwarded to Scottish Government. This report is attached as an
appendix. We have received positive feedback from the Scottish
Government. 
The governance for this piece of work currently sits under Midlothian
Trauma steering group chaired by Head of Adult Services with
members from a range of organisations. The Head of Adult Services is
also the Trauma Champion across the HSCP and Midlothian Council.
Page 288 of 340

Page 289

3
We are in the process of developing a Trauma Informed Practice
Development Worker (£100k funding from the Scottish Government for
the next two years has been secured). This post will both coordinate
the ongoing training to a range of roles and agencies across Midlothian
as well as develop Midlothian to become a trauma informed
community. This will include exploring how public buildings can be
more trauma informed, how we all might be able to modify our
behaviours and communication to enable it to be more trauma aware. 
It should be noted that there is a commitment to review the
membership of the Trauma Steering Group so that it is more congruent
with a One Council approach. It has been very much centred on Adult
Social Work services. Both the Head of Adult Services and the CSWO
and Chief Officer Children’s Services, Partnerships and Communities
are committed to leading on this piece of work and engaging with other
colleagues across Midlothian Council. Moreover, there are clear links
with The Promise. The post referred to above will work across all areas
in Midlothian Council and there is a strong commitment to ensure
trauma informed approaches and practice are embedded across all
areas. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
There are no resource implications in this report as Midlothian has
received £100k over two years to recruit a Trauma informed practice
development worker to lead on the work. Including on costs the
Trauma development worker post costs £45,000 per year which leaves
a small surplus each year. The Trauma steering group will decide what
will be the use of the remaining money. 
4.2 Digital 
There are no digital implications in this report. 
4.3 Risk 
The Trauma informed practice development work will increase
awareness for staff and communities in Midlothian and how we might
modify our behaviour and language when interacting in front line
services and present a more empathetic and understanding approach. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
Not applicable. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Page 289 of 340

Page 290

4
Appendices 
Appendix A – Report Implications
Appendix B – Trauma Informed Practice Pilot project report 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
There are some links to the Trauma Informed practice development
work within the Single Midlothian Plan 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
Not applicable. 
A.5 Involving Communities and Other Stakeholders 
The trauma informed practice report is accessible to the general public
following its approval by Scottish Government. The working group for
the Pilot project included a range of people from different organisations
and those with lived experience. 
A.6 Impact on Performance and Outcomes 
The Trauma informed practice development work as highlighted in the
report and its recommendations will continue to train more front line Page 290 of 340

Page 291

5
staff across organisations in Midlothian. Therefore increasing the
number of trained staff and increasing awareness and understanding of
supporting people who have experienced trauma. This will lead to
Midlothian becoming a Trauma informed community. 
A.7 Adopting a Preventative Approach 
Not applicable. 
A.8 Supporting Sustainable Development 
Not applicable. 
APPENDIX B 
Background Papers/Resource Links Trauma Informed Practice Pilot project
report 
Page 291 of 340

Page 292

Page 292 of 340

Page 293

Midlothian Trauma
Training Pilot      
Item 8.14
Page 293 of 340

Page 294

2 | P a g e
ACKNOWLEDGEMENTS  
The work described in this report would not have been possible without the
enthusiasm and contributions of a wide range of partners.  The Midlothian
Trauma Training Steering Group would like to thank:
The Lothian Transforming Psychological Trauma Implementation Coordinators; Dr
Suzie Black and Dr Gillian Radford, for their support and guidance, allowing us to
use their training resources and for providing training for our Trauma Trainers.
CAPS Collective Independent Advocacy, Ele Davidson and the Lothian People with
Lived Experience Group for their enthusiasm for the pilot, observations, ideas and
useful feedback.
The Midlothian Trauma Trainers; Lorraine Chapman, Arab Chaudhry, Jackie
Davidson, Sarah Fletcher, Gemma Goodwin, Kirsten Kidd, Gillian MacDonald,
Rowena Macintosh, Joe Riba Segues Ewan Ross, Ann Marie Sheerer, Martin
Sweeney for their support and commitment to delivering the training.
The Midlothian Trauma Training Administrators: Liz Sinclair and Jennifer Aliscio for
their support with the administration tasks.
The Midlothian Council Learning and Development Team; Christine Dunn, for her
guidance and collaborative working. 
Report Written by Penny Balfour, Clinical Associate in Applied Psychology.
Trauma Training Coordinator for the Midlothian Trauma Training Pilot
penny.balfour@nhslothian.scot.nhs.uk  
Page 294 of 340

Page 295

3 | P a g e
CONTENTS
Introduction................................................................................................... 5
Approach....................................................................................................... 7 
Midlothian Trauma Training Steering Group…………………………. 7 
People with Lived Experience Involvement………………………….. 7 
Scottish Trauma Informed Leadership Training (STILT)…………… 7 
Midlothian Trauma Training Pilot Coordinator………………………. 8 
The Midlothian Trauma Training Team………………………………... 8 
The Training Packages…………………………………………………… 9 
Awareness Raising Activities............................................................. 9 
Audit of STILT and Number 11 Mangers Staff Training Needs….... 10 
The Impact of COVID………………………………………..................... 11
Evaluation…………………………………………………………………………. 12 
Reach of the Trauma Training…………………………………………… 12 
Level 1 and 2 Training Attendance Numbers…………………… 12 
Organization representation at Level 1 and Level 2 training… 12 
Evaluation of the training…………………………………………………… 14 
Perceptions of Acceptability and Usefulness of the Training... 14 
Impact of the training.................................................................... 17 
Perceived increase in confidence knowledge and Skills……………... 17 
Self Care………………………………………………………………………... 17
Page 295 of 340

Page 296

4 | P a g e
Implementing Trauma Informed Practice………………………………… 18 
Intention to Apply Training to job…………………………………………. 18 
Examples of how participants applied the Level 1 Training to
their work at 6 week and at 3 Month follow-up………………….. 18  
Barriers and Challenges to implementing trauma informed practice.  21  
Additional feedback from Attendees......................................................  23 
Level1............................................................................................. 23 
Level 2............................................................................................ 23 
Level 3, Safety Stabilization Training..................................................... 23 
Feedback from CAPs People with Lived experience Group................ 24 
Feedback from the Midlothian Trauma Trainers................................... 27 
Experiences of Delivering the Training...................................... 27 
Views about the role of Trauma Training Coordinator.............. 28 
How Transforming Psychological Trauma training can
become further established..........................................................
28 
Conclusions............................................................................................  31 
Recommendations................................................................................ 33 
Appendices............................................................................................. 36 
Page 296 of 340

Page 297

5 | P a g e
INTRODUCTION 
In Midlothian, the Health and Social Care Partnership (Midlothian HSCP) and third sector
organisations are committed to creating a culture that is trauma informed.  The vision is for a
whole system, multi-level approach to workforce training and development. 
Leaders in Midlothian Community Planning Partnership, including service areas within both
Midlothian Council and Midlothian HSCP, identified that an understanding was required by
the workforce of trauma, adversity and its impact on health, learning and wellbeing. The
‘workforce’ referred to is multi-agency, and includes a range of roles – from receptionist in
universal services to clinical specialists across the lifespan.
A brief scoping exercise identified gaps in Trauma Informed Practice training for people in
client-facing roles across Midlothian. Staff in council contact centres, schools, early years
centres, housing services, the revenues service, homeless services, primary care, third
sector programmes, libraries, adult social care, children’s services and leisure services all
expressed a desire for their practice to be better trauma informed.  
In June 2018 the Scottish Government committed £1.35 million over three years, to design
and deliver a National Trauma Training Programme (NTTP), to be coordinated by NHS
Education Scotland (NES). The aim is to develop and support a consistent, trauma-informed
workforce across all frontline services. In addition to developing a National Trauma Training
Framework and Training Plan, one of the core elements of the NTTP was to establish Pilot
Delivery Trial Sites, to test the implementation of trauma training for priority public sector
frontline workers. 
Following the release of the NES Trauma Training Framework (2017), it was identified that
there were a limited number of professionals within Midlothian with the knowledge and skills
to deliver the volume of training required across levels 1 – 3.  
Working with the local NES Transforming Psychological Trauma Implementation Co-
ordinators (TPTICs), it was agreed that a helpful pilot site for trauma training would be the
new Recovery Hub - Number 11, a one-stop shop for people with experience of substance
misuse, criminal justice, mental health challenges and/or other aspects of social inequalities.
In September 2019 the bid to NES from Midlothian HSCP was successful and Midlothian
was allocated £40,000 to deliver Trauma Training to the Midlothian workforce. The training
model proposed was an open access one.  The aim was to provide:
Page 297 of 340

Page 298

6 | P a g e
 Level 1 (Trauma Informed) Training to 400 frontline workers and volunteers in a
range of public facing Services 
 Level 2 (Trauma Skilled) Training to 110 people, initially focusing on the services and
partner agencies associated with the new Recovery Hub, Number 11. 
 Level 3 (Trauma Enhanced) Training was to be provided by the local TIPTICs.
 To ensure full engagement and ongoing sustainability, key leaders and managers
would be expected to attend Scottish Trauma Informed Leadership Training (STILT)
which was provided by NES. This was to ensure that they had a good understanding
of the Transforming Psychological Trauma agenda and their responsibilities in
supporting staff to undertake training and implement learning in their day to day work.
 To build on existing good practice of staff supervision and to support local service
areas to embed this within their practice as appropriate to the staff group. 
Page 298 of 340

Page 299

7 | P a g e
APPROACH 
Midlothian Trauma Training Steering Group 
A multi agency steering group was established to provide overall support and direct the pilot.
The steering group, with representation from Midlothian HSCP, included mental health,
substance misuse, criminal justice, learning and development and psychology colleagues. 
Children and adult services were represented. 
People with Lived Experience Involvement
The expertise of people with lived experience was sought through the Collective
Independent Advocacy (CAPS) People with Lived Experience Group to inform the approach
through representation at the Steering Group.
Scottish Trauma Informed Leadership Training (STILT) 
Having commitment from leaders and managers is vital in any process that involves
significant organisational change.   
Senior organisational leaders, senior operational managers, service leads and team leads
from Midlothian Health and Community Partnership (MHSCP) and third sector organisations
were invited to attend the Scottish Trauma Informed Leadership Training (STILT). This was
delivered by the NHS Education Scotland Transforming Psychological Trauma Team. The
intention being to ensure:
 A shared understanding of trauma informed practice
 Full engagement
 Ongoing sustainability
 Consideration of how to embed trauma informed practice into the workplace
 Staff are supported to undertake and implement trauma training across their
organisation  
STILT was held locally over 1.5 days with 25 team leads and managers attending from a
variety of services including; Midlothian Council, NHS Lothian, Sure Start, CAPS, Women’s
Aid, The Thistle Foundation, Health in Mind and Mid and East Lothian Drugs (MELD). 
Page 299 of 340

Page 300

8 | P a g e
Midlothian Trauma Training Pilot Coordinator 
A Clinical Associate in Applied Psychology was seconded to the 0.5 WTE role of Midlothian
Trauma Training Pilot Coordinator (TTPC) to implement the Midlothian trauma training plan.
The role of the Pilot Co-ordinator was to:
 Co-ordinate and manage the local delivery of Trauma Informed (Level 1) and Trauma
Skilled (Level 2) Trauma training.
 Facilitate and co-facilitate the Level 1 and Level 2 trauma training to workers in
Midlothian.
 Support the identified local network of Level 1 and 2 trauma trainers.
 Contribute to the development of the Midlothian trauma training evaluation.
 Co-ordinate and implement the trauma training evaluation.
 Communicate through written reports and verbal feedback the outcome of training. 
An administrator from Midlothian Psychological Service’s was seconded 0.25 WTE to
support the pilot coordinator in organising the trauma trainings across Midlothian. The
administrator’s role included:
 Setting up a Midlothian Trauma Training email account and monitoring and
responding to emails for bookings and enquiries.
 Identifying and booking rooms for training events. 
 Managing the training bookings and waiting lists.
 Sending emails to lists of delegates including appropriate resources. 
The Midlothian Trauma Training Team 
The Midlothian Trauma Training Team was recruited from 26 members of staff from
Midlothian Council, NHS Lothian, Midlothian Sure Start and Women’s Aid. They had all
previously attended a Level 1 or Level 2 Train the Trainer event. These were facilitated by
the Lothian TPTICs. Across September – November 2019 a total of 26 people were trained,
15 people were trained to deliver the Level 1 trauma training and 11 people were trained to
deliver both the Level 1 and Level 2 trauma training. 
Page 300 of 340

Page 301

9 | P a g e
At the start of the pilot, the Midlothian trainers were invited to an event organised by the
Midlothian Trauma Training Co-ordinator. This was an opportunity to introduce the pilot,
discuss the materials and how we could co-ordinate and work together. 
In terms of retention, 11 trainers did not take part in the pilot for various reasons:
 5 did not respond to emails 
 1 person opted out 
 3 people moved on to other jobs 
 1 person did not have capacity to deliver the training 
 1 person went on maternity leave.
Of the 15 people who remained:
 12 delivered level 1 and/or Level 2 trainings. 
 3 trainers remained involved but were unable to deliver the training due to capacity
issues and also identifying a suitable date and time. 
The Training Packages 
The Level 1 and Level 2 Training Packages were developed by the Lothian TPTICs. The
Training Packages had been designed using the NES Knowledge and Skills Framework, to
ensure that they met the competencies that were required for the training at each level.   
Level 1 training was designed to be delivered in 1.5 hours and the Level 2 training over one
day. Both packages are for colleagues working with clients across the lifespan. 
Awareness Raising Activities 
The Midlothian Training Co-ordinator presented at several local events. The aim of these
was to inform people about the NTTP, available resources and, to promote the Midlothian
Trauma Training Pilot. These included presenting at the Midlothian Voluntary Sector
Summit, a Midlothian Health and Social Care Partnership Senior Management meeting, and
the Midlothian Council Services with Communities meeting.
Page 301 of 340

Page 302

10 | P a g e
The Level 1 training events were advertised widely by email through Midlothian HSCP and
Midlothian Voluntary Action. As there were fewer Level 2 training events, emails advertising
events were initially targeted to managers who had attended the STILT training and staff at
Number 11, before being advertised more widely. Emails advertising the training events
included information about the levels of training and who the training was appropriate for, as
well as attachments and links to the NES Transforming Psychological Trauma Knowledge
and Skills Framework and Training Plan documents. The emails were also an opportunity to
include links to the range of freely available trauma training resources from the NES
Transforming Psychological Trauma website. During the pilot, additional emails were sent to
senior managers to advertise the NES Deep Dive events. These explored how adopting a
trauma-informed approach could support key community planning priorities, and help
professionals to identify tangible steps towards ensuring that this approach is embedded in
policy and practice moving forward. 
Audit of STILT and Number 11 Managers: Staff Training Needs 
Building on the STILT training, and focusing on Number 11 as a Recovery Hub, team leads
and managers, who attended the STILT training, and/or were based at Number 11, were
emailed to inform them about the Midlothian Trauma Training Pilot. A document was
attached which was adapted from the NES National Trauma Training Plan.  This document
asked them to assess their staff training needs, so that their staff could be targeted for the
training. 
Unfortunately, COVID-19 significantly impacted on the number of responses that were
received. Responses were received for 43 (36%) of members of staff working at Number 11.
Of those respondents: 
 12% had no previous trauma training
 33% had completed training equivalent to Level 1. 
The majority of staff had completed training equivalent to Level 3 (40%) and 16 % had
completed Level 4. Previous training included: Trauma Enhancement Training (provided
externally by Epione Training and Consultancy, to the Midlothian Council Criminal Justice
Service), Safety and Stabilisation Training, and Trauma Focused CBT provided by the
TPTICs and NES respectively. Of the 40 members of staff who were identified as requiring
further training, the training required was at Level 2 or above.
Page 302 of 340

Page 303

11 | P a g e
The Impact of COVID-19. 
The training was designed and organised to be delivered face to face. The initial focus of the
pilot was to deliver the Level 1 Trauma Training. Fourteen Level 1 events had been
organised to be held in various community settings across Midlothian. There was a high
demand for the training with 193 people booking a place in 3 weeks. Two Level 1 training
events took place, however due to COVID-19 the remaining 12 events had to be cancelled
and the Pilot put on hold. In addition, a presentation to the Elected Members of Midlothian
Council also had to be cancelled. 
As the situation developed it became clear that for the pilot to continue the training would
need to be delivered remotely. The Lothian TPTICs adapted their training packages so that
they could be delivered on-line. Level 1 remained a 1.5-hour training session and the Level 2
training was adapted into 3 modules each lasting 2.5 hours. These were to be delivered in
sequence after participants had completed the NES emodule ‘Developing Your Trauma
Skilled Practice’ which was available through TURAS (NES’s digital learning platform). 
The Midlothian Trauma Training team were encouraged to attend one of three online Top Up
training sessions facilitated by the TPTICs between August and October 2020. The aim
being the up skilling trainers to deliver the Level 1 and 2 packages remotely. 
Moving to online delivery meant that we could offer less places at each event. It was decided
to limit this to 20 places per event, and extend the Level 1 training to 2 hours, as this felt
manageable when delivering training in this format. To make maximum use of the training
capacity, the pilot co-ordinator facilitated at each event, with one other co-facilitator from the
Trauma Training Team. Prior to each event, the pilot coordinator and co-facilitator met
remotely to discuss and practice on-line delivery. There were also opportunities for co-
facilitators to observe the remote training prior to delivering it. As a large proportion of the
pilot coordinator’s time became focused on delivering training, and because the priority
within services became on managing the pandemic, there was less opportunity to offer and
provide consultation to services regarding the implementation of trauma informed service
delivery. 
Page 303 of 340

Page 304

12 | P a g e
EVALUATION
Reach of the Trauma Training
Level 1 and 2 Training Delivery Attendance Numbers 
.
Organisation representation at Level 1 and Level 2 Training events
In terms of reach, staff with a variety of different job roles within Midlothian HSCP and the
Third Sector, accessed the training. 
LEVEL 1
A total of 359 people were trained
at Level 1.
39 Level 1 training events were
organised to be delivered remotely
via MS Teams, 461 people booked
a place and 338 people attended the
training. 
LEVEL 2
A total of 107 people were trained
at Level 2.
9 events were organised to be
delivered remotely via MS Teams,
152 people booked a place to
attend and 107 people competed
the training.
30 people who booked a place did
not attend or cancelled, 6 people
attended only 1 session and 9
people attended 2 sessions
LEVEL 1 Attendees 
Midlothian
Council 54%
NHS Lothian
11%
3rd Sector
34%
DWP 1%
Scottish Fire
and Rescue
LEVEL 2 Attendees 
Midlothian
Council 75%
NHS Lothian
12.5%
3rd Sector
12.5%
Page 304 of 340

Page 305

13 | P a g e
The majority of attendees for both the Level 1 and Level 2 training were from Midlothian
Council followed by NHS colleagues and finally the Third Sector, 2 people attended the
Level 1 training from the Department of Work and Pensions and 1 person from Scottish Fire
and Rescue. 43 staff attended the training from Number 11, 16 of them attended Level 1
training and 22 attended Level 2 training. Number 11 staff were from a variety of job roles
and services including administration, criminal justice social work, the community and joint
mental health teams and MELD. 
The higher proportion of Midlothian Council employees may be due to the pilot being a
Midlothian Council initiative. Most of the awareness raising activities were aimed at and
delivered to Council staff, and the advertising was through the Midlothian Council networks. 
For the Level 1 training, 34% (n=122) people attended from twenty seven Third Sector
organisations in Midlothian. The highest representation came from Women’s Aid 15%
(n=19), Scottish Autism 11% (n=14), and Health in Mind 10% (n=12). For the Level 2 training
11% (n=12) attended from 5 Third Sector organisations in Midlothian, most commonly Sure
Start 50% (n=6), Partners in Advocacy 17% (n=2) and VOCAL 17% (n=2). 
Figure 1: Examples of departments, services and job roles represented at the Level 1
and 2 Trainings 
Page 305 of 340

Page 306

14 | P a g e
A significant majority of attendees, at both the Level 1 and Level 2 trainings, were frontline
staff. Also attending an event were 57 staff, with senior positions. These included team
leaders, management and senior management from statutory and third sector services. A
further 27 staff with senior positions within MHSPC attended one of the three Level 1 events
which were held specifically for them.  These events were organised as a way of keeping
Trauma Informed Organisational Change on their agenda.  In addition it gave them an
opportunity to experience the training for themselves, to help them promote and support their
staff to attend an event. 
Evaluation of the Training
Participants were asked to complete an on-line evaluation questionnaire via the JISC Survey
Platform, before and immediately after the training and at 6 weeks and 3 months post
training. Partly due to the timescale of the pilot and participants only having recently
completed the training and also the difficulty of getting people to complete post training
follow-up surveys only a small number of people had completed the 3 month follow up
evaluation survey at Level 1 and the 6 week and 3 month evaluation survey at Level 2
(Appendix 1).These therefore are not included in the following analysis. Results from
statistical analysis comparing pre and post training mean values, for the questionnaire items
for each package, are displayed in Appendices 2,3,4,6 and 6.
Perceptions of Acceptability and Usefulness of the Training 
Participants rated the Level 1 and Level 2 trainings highly. 96% (n=339) agreed that they
would recommend it to a colleague, 96% (n=333) of the attendees agreed that the training
gave them a better understanding of the impact that trauma can have, and 94% (n=331)
agreed that the training would have a positive impact on their job. 
Page 306 of 340

Page 307

15 | P a g e
Figure 2: Level 1 and Level 2 Attendee Feedback. 
Percentage who Agree with Statement 
What was most useful about the Level 1 training? 
It was a really useful and insightful course. The most useful comment I took away was in
thinking not 'what is wrong with you' but 'what happened to you'.  I found this a really simple
way of rethinking my approach when dealing with service users.  Anonymous 
It was really interesting, and thought provoking. I found the statistics pretty eye-opening. I      
think I have a greater understanding of the links with trauma and the way people can present
to the service. Any training that can break down barriers is such a positive thing. Customer
Service Advisor. 
The training as a whole was very good and useful. I found the examples of how trauma can
affect people's everyday lives and practical steps one can take to be more trauma informed
particularly helpful. Monitoring and Evaluation Officer. 
I found the questions relating to our practice useful as we were using the information from
the training and putting it into context. Children’s Services Practitioner 
Hearing about other services and the changes they have made to try to be more trauma
informed. Psychological Therapist. 
Recommend training
to a colleague 
Agree 96%
Neutral 4%
Disagree 0%
Better understanding
of impact of trauma
Agree 96%
Neutral 4%
Disagree 0%
Training will have a
positive
Agree 94%
Neutral 6%
Disagree 0%
”
“
Page 307 of 340

Page 308

16 | P a g e
What was most useful about the Level 2 training? 
Being able to recognise that people have different levels of tolerance and how the brain
reacts to memories. Social Work Practitioner. 
The training is very informative, great to hear other professionals talk about their own
experience of dealing with service users who present with traumas. Foster Carer. 
The overall course has been useful on both a personal and practical level.  Realising the
significance a positive relationship with one person can have on people we work with and
how valuable these relationships are. Youth worker. 
Thinking about self-care and strategies which workers can use to promote own wellbeing.
Social Worker. 
Tips on how to respond to disclosures - quite actionable in terms of our procedures. Chief
Executive. 
It made me think differently about the responses to situations from the people I work with
and ways of creating environments where people who have experienced trauma feel safer
and more supported. Social Worker. 
The opportunity to think about the concepts as a manager. Manager. 
It was useful to consider strategies to build trust with people and how to support someone
who has experienced or may be experiencing trauma. Social Worker. 
“
”
Page 308 of 340

Page 309

17 | P a g e
Impact of the Training 
Perceived increase in confidence, knowledge and skills 
For the Level 1 training, 9 items on the evaluation questionnaire assessed participants
perceived confidence, knowledge and skills in terms of responding to and supporting people
who have been affected by trauma. 
A One-Way, Repeated-Measures analysis of variance (ANOVA), showed highly
statistically significant increases in participants perceived confidence in their ability to
apply trauma informed principles to their job at pre and post. This was maintained at 6
week follow up (F=48, df=2, p<0.000) (Appendix 2). Paired Samples T tests comparing
means for the remaining9 items pre and post training, further demonstrated that training
resulted in a statistically significant increase in understanding, confidence and
knowledge post training (Appendix 3).
For Level 2, 22 items on the evaluation questionnaire assessed changes in participants’
perceived confidence, knowledge and skills, in terms of responding and supporting people
who have been affected by trauma. The same analysis was used for the Level 2 training. A
One-Way, Repeated-Measures ANOVA, between each of the 3 modules, showed
statistically significant increases in participants perceived confidence in their ability to
apply trauma informed principles to their job (F=8.7, df=3, p<0.000) (Appendix 4). Paired
Samples T tests comparing means for the remaining 21 items, pre and post training, further
demonstrated that training resulted in a statistically significant increase in understanding,
confidence and knowledge (Appendix 5). 
Self Care
In addition to increases in understanding, confidence and knowledge, a key aspect of the
Level 1 and 2 training is to raise awareness of the importance of practicing self care
especially, in the context of supporting people who have been affected by trauma. For both 
Level 1 and Level 2 training, Paired Samples T tests comparing means pre and post training,
indicated statistically significant increases (p<.000) (Appendix 3 and 5) in the following
questionnaire items:
 I understand importance of self-care and support when working with people who may
have been affected by trauma Level 1 
  I am aware of strategies to look after my wellbeing 
Page 309 of 340

Page 310

18 | P a g e
  I know how I can access further support in order to look after my wellbeing, should I
need to.
Implementing Trauma Informed Practice 
Intention to apply training to job 
Post Level 1 and Level 2 trainings, participants were asked if they intended to apply the
training to their jobs.  Of the 322 people (69% of total attendees) who responded, 95% of
people indicated that they planned to apply the training in their work. 
Qualitative feedback was invited for both trainings to gather data on participants intended
trauma informed practice changes. Data was analysed for themes.   
Figure 3: Level 1 and Level 2 Attendee Feedback. Plans to apply training to job. 
“I will be more aware when patients arrive at reception and are not being pleasant that they
are probably out with their Window of Tolerance and this will help me to be more empathetic.
Administrator. 
Review our systems to ensure that we operate in a trauma informed manner. Social Worker. 
The importance to remember 'self care', not only for myself, but also for my team. I will aim
to use the self care tool with my staff in support and supervision. Manager. 
Themes for intended changes post
Level 1 and Level 2 training 
changes to own practice (81%) 
changes to service procedures (7%) 
use of self care strategies (5%), 
sharing knowledge (5%) 
ensure other staff are trained (4%) 
supporting and supervision other staff
and team (4%) 
access further training (1%) 
I plan to apply training
to my job.
Post Level 1 and Level 2 training 
Yes 95% Not Sure 4%
No 1%
Page 310 of 340

Page 311

19 | P a g e
Ensure all colleagues in the team complete Trauma awareness training and embed this in to
their approach with learners Career Support Worker. 
Bring this up in conversation more often when discussing cases. Add notes from this training
to my bulletins to highlight the benefits. Take topic to team meetings as a discussion point.
Manager.” 
Examples of how participants applied the Level 1 training to their work
at 6 and 3 month follow up. 
Participants were asked at the 6 week and 3 month follow up if they had been able to apply
the training to their jobs. Importantly at Level 1, 52% of the 65 respondents said that they
had been able to apply the training to their work. 
Trust       
When I was working with a person who was frightened by past traumatic experience
becoming more vivid, I was able to apply learning from the training to gain trust to support
her. Occupational Therapist. 
I try to make sure clients/other employees are well informed about every step of the process,
eg. what paperwork and why it is needed. Administrator. 
Safety 
I offer a safe environment and working remotely I ask young people if they have a safe
space at home or school to talk, if they do not I can rearrange to make sure it is at a suitable
time or help them to gain access to a private space. Counsellor. 
I ensure women have a quiet comfortable space to talk ensuring they feel safe at all times.
Support Worker. 
Choice
The young people get to choose what we discuss each week, when they want a meeting.
Youth Worker. 
I re-evaluated my contact method and suggest different options to families (emails, phone
calls, texts, Zoom, Skype, or face to face meeting in a community centre). Development
Worker.
“
Page 311 of 340

Page 312

20 | P a g e
Collaboration
I work in my job role by collaboration with other professionals, which includes my clients. We
work together ensuring the client has the best opportunities given to them to live life to full. It
is important that the client feels part of this. Peer worker. 
Collaboration with the families I work with - working together as equals.  Family Support
worker. 
Empowerment
I support them to make contact with other departments themselves so that they can have
control of the information passed on. Library Assistant.  ”
Page 312 of 340

Page 313

21 | P a g e
Barriers or Challenges to Implementing Trauma Informed Practice
Changes  
Post training and at follow up, participants were asked to select from a list of perceived and
then actual challenges and barriers to implementing trauma informed care. 
The most common choice post Level 1 and 2 training, and at the Level 1 six week follow up,
was that people did not think that they had the opportunity in their work. This was often
linked to the impact of COVID including changes to role, working remotely and high
demands in terms of workload. 
What are the Barriers of Challenges to Implementing the Level 1 and 2 Training? 
Training attendees were also asked whether there were any additional barriers to
implementing the training. Interestingly, a number of participants who worked for services for
specific populations, including learning disabilities and autistic spectrum disorders, identified
that they would benefit from follow up training specifically tailored for people working with
these groups. 
0% 10% 20% 30% 40% 50% 60%
I don’t have the time or the space within my role
to think about how I might apply trauma informed
principles
I don’t feel I have enough knowledge about
trauma informed practice to change the way I
work
I don’t feel confident enough to apply the
knowledge from today’s training
I don’t feel like there is the opportunity within my
work place to apply what I have learnt
Trauma informed practice is not currently seen as
a priority within the service I work in
I don’t think my manager would be supportive of
any trauma informed changes I might suggest
Post Level 2 Training (n=61) Level 1 6 Week Follow Up (n=33) Post Level 2 Training (n=33)
Page 313 of 340

Page 314

22 | P a g e
Additional barriers or Challenges to Implementing the Level 1 and 2 Training 
A few respondents gave suggestions for how the barriers could be overcome: 
The best solution would be for more resources for expert trauma work so people are
seen in a timely way. Health and Wellbeing Practitioner. 
I think the principles of this  training when we are out of Lock down will be used more when
we are seeing clients normally again. I think a lot of people - Clients and workers will have
been traumatised by Covid 19. Occupational Therapist. 
Refresher sessions/ emails could be a good reminder to implement the trauma informed
principles into one's practice. Monitoring and Evaluation Officer. 
Keeping an open mind and keeping "trauma informed thinking" as a daily reminder to
oneself.  Early Years Family Practitioner.  
0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50%
Service remit /statutory reqirements
Work environment, demand, waiting lists, time
Lack of resources and funding
Lived experience of trauma
Impact on worker
Other services and staff not being Trauma
Informed
Organisation and workpace culture
Lack of  trauma specific services
Working with specific populations 
Impact of Covid-19 restictions
Requirement  for further training
Adhering to boundaries
Being able to build trust quickly
Post Level 1 Training (n=34) Level 1 6 Week Follow Up (n=13) Post Level 2 Training (n=23)
“
”
Page 314 of 340

Page 315

23 | P a g e
Additional Participant Feedback
Level 1 Training 
Participants were asked if there anything that you would change about the training?
The majority of the Level 1 participants, who fed back, commented that they found the
training useful, they liked the training packages including the slides and animations and that
they thought the training was well presented. Several people commented that they would
have preferred to attend a face to face training, more interaction between participants and
the addition of practical examples and case studies. Several people commented that they
felt that the training was at a level that was too basic for them and a few people commented
that not being able to see the other participants due to the format of teams to be off-putting.
Level 2 Training
Similarly to the Level 1 feedback, the majority of Level 2 participants commented that they
found the training to be useful, engaging and pitched at the right level of information. There
were many positive comments about the quality of the training and the knowledge and
experience of the Trainers. Again, there were a number of comments that it would have
been helpful if the training had been tailored towards their particular staff groups, so as to
make it more relevant to the particular issues that they experienced in their workplace. A
number also commented that the first session felt like a repetition of the TURAS emodule
that they were asked to complete prior to the training. Some also commented that although a
lot of the information was familiar to them, they found the training to be a good refresher.
Level 3: Safety and Stabilisation Training 
Level 3, Safety and Stabilization training was provided by the Lothian TPTIC’s in November
2019. Fourteen people were trained from Midlothian, including 10 people from the NHS, 3
people from Midlothian Council and 1 person from the third sector.  
Page 315 of 340

Page 316

24 | P a g e
Feedback from  CAPS  People with Lived Experience Group 
The Trauma Training Pilot Coordinator met the CAPS People with Lived Experience group
on 3 occasions. Initially discussions centred on how they could be involved in the delivery of
the pilot. Their ideas included:
 Observing the training packages
 Attending Train the Trainers and then co delivering the training
 Involvement in the evaluation
 Linking in with work already being developed within their group. For example
incorporating short videos about peoples lived experience into the training. 
Due to the impact of the pandemic there was less opportunity to develop these ideas further
at this point. However several members of the People with Lived Experience Group were
able to attend a Level 1 training event. The Group also met after the pilot had finished and
were able to provide feedback which is summarised below. 
Feedback on the Training and Training Packages
As the understanding of trauma and its impact is rapidly developing, the group felt that it is
vital the materials and training is regularly reviewed, including by People with Lived
Experience, in order to reflect this. 
Language
 The group commented on the importance of the use of language in all aspects of the
training. 
 The importance of the facilitators’ language being inclusive and normalising.
 Updating the language used, for example in the “Opening Doors” animation from “sex
of worker” to “gender” of worker.
 The training refers to the ‘workforce’; this could be reworded to workforce and
including some people with lived experience.
Self Care
 Being more explicit about using self care strategies at the start of the training. 
Length of Training
 Extending the length of the training to include the opportunity for participants to
introduce themselves so that participants knew who was attending. 
Page 316 of 340

Page 317

25 | P a g e
E-learning
 Opening access to the TRURAS e-leaning modules, which are recommended and
also a pre-requisite to the Level 2 Training, to make them accessible to training
participants who are not in paid employment for example volunteer’s and people with
lived experience. 
People with Lived Experience as Trainers
 The involvement of Lived Experience was highlighted by the group in relation to
trainers themselves. The group commented that although the pandemic is likely to be
have been, in part, the cause of the relatively high level of dropout in trainers, the
group believed that offering these opportunities to a more diverse range if people,
including people with lived experience, would not only have the potential to decrease
the level of drop out but also provide a more balanced approach to the training being
delivered. 
Evaluation
 The group noted that at the start of their involvement they had discussed being
involved the evaluation and highlighted that this would still be extremely beneficial to
allow for more qualitative responses. Whilst they understood the need for the
statistical data, it was felt the qualitative aspect required development around what
people wanted, what they had learned and what improvements could be made in the
future. It was also suggested that the follow up feedback time frame could be
extended and how requests for feedback are communicated to participants requires
further consideration so that is does not feel tokenistic. 
Training Target Groups
 The group commented that, in terms of future planning, it would be important to
ensure that key services, which would benefit from using a trauma informed
approach, are targeted for Trauma Training in the future. In particular the services
which had a low uptake for the training for example; the Department of Work and
Pensions, Job Centre Staff, Housing and Homeless Officers and other similar
services. 
Page 317 of 340

Page 318

26 | P a g e
The Trauma Co-ordinator Role
 The post of co-ordinator was thought to be important and it was thought that this
should be someone who was embedded in the community and was keenly aware of
the make-up and structure of the community with good links to organisations and
businesses in the area.
Future Investment
 The Group feedback about the importance of ensuring there are adequate
resources/funding to support the ongoing development of this national initiative at a
local level.
In response to the feedback that was received from the group during the pilot, the Level 1
training length was increased from 2 to 2 ½ hours, to allow time for participant introductions.
To highlight the importance self care, the wording on the introductory email was adjusted
with more explicit direction about the use of self care during and after the training. This was
reinforced at the start of each training event. In the future, further consideration can be given
to how this can be developed, perhaps by changing the order to include the self care section
at the beginning of the training rather than the end and by including a self care activity at the
start of each event.  Feedback about the use of language during training was fed back to the
facilitators and the wording on the introductory email was changed to make it more explicit
as to the number of people who may be in attendance and that the training was open
broadly to people, whether paid or unpaid who were working in Midlothian. 
One member completed an online evaluation (Appendix 7) which was circulated to the
People with Lived Experience Group at the end of the pilot. They suggested the following
developments which were supported by others from the group.
 “Dynamic involvement of people with lived experience at all stages 
 More opportunity for peer to peer education
 Develop a national network of peers/groups perhaps connecting through    existing 
peer networks or trauma champions 
 Explore how peer values such as mutuality, reciprocity and equality can exist with
changing hierarchical power dynamics and support collaborative approaches in
communities”. 
Page 318 of 340

Page 319

27 | P a g e
Feedback from the Midlothian Trauma Training Team
At the end of the pilot the Midlothian Trauma Training team were asked to complete an
anonymous online survey (Appendix 8) to gather their thoughts about the pilot, training and
their thoughts and ideas going forward. Ten out of the 12 trainers responded (excluding the
Co-ordinator).
Experiences of delivering the training 
The Trauma Training Team rated the training packages favourably, with 40% of them
agreeing that they were “excellent” and 60% “good”. Feedback included: 
 The training was set out clearly.
 Easy to follow. 
 Opportunities to share examples of trauma informed practice with participants was
helpful. 
One trainer noted that there was feedback from some participants suggesting that the
language in the Opening Doors animation could be updated, from “sex of the worker” to
“gender of the worker”, as some participants may have found this triggering. One trainer
commented that it was important to include more explicit references to social workers as
helping professionals in relation to trauma. Several trainers fed back the challenges of
delivering trauma training remotely, in particular ensuring the engagement and participation
of attendees. 
The team were asked what barriers they had to overcome to deliver the training. 
 66% found it difficult to find the time within their role 
 33% said that they had not felt confident in delivering training remotely. 
Additional barriers included:
 The long gap between completing Training for Trainers and delivering the training
 The challenges of delivering good quality training remotely including engaging
participants and the technical challenges of remote delivery. 
Despite the additional challenges because of Covid and the extra work having to adapt the
training to a remote delivery, 80% of the trainers stated that they intended to continue to
deliver the training in the future, and 20% were undecided. 
Page 319 of 340

Page 320

28 | P a g e
Views about the role of a Trauma Training Co-ordinator.
As the Midlothian Steering Group chose to use most of the funding for the pilot to employ a
Trauma Training Co-ordinator, it seemed important therefore to find out from the trainers
their thoughts about having a person specifically employed in this role.   
90% of the Training Team said that they strongly agreed and 10% said they agreed that
there was a benefit to having a person employed in this role. Comments included that it was
an essential role and it was helpful to have a co-ordinator to: 
 Drive the training on despite the pandemic
 Engage support and motivate the trainers to deliver the training and to help them to
transition to remote delivery
 Have someone consistent and reliable and who knew everything about the pilot. 
90% of the Trainers strongly agreed or agreed that it would be of value, to have a Trauma
Training Coordinator in post once the Pilot is finished. A suggestion was that it would be
useful for a coordinator to work closely with the Midlothian HSCP Learning and Development
Team, as they have expertise in advertising and promoting courses.   
How Transforming Psychological Trauma Training in Midlothian can become further
established. 
The Training Team, were asked about how trauma training can become further established
in Midlothian once the pilot came to an end. 
Trainers were asked to select in terms of importance the priority actions for going forward. 
Page 320 of 340

Page 321

29 | P a g e
Priority Actions 
The majority to the Training Team (90%) thought that it would be important to focus on
offering training to specific teams, and to work with and support whole teams to become
trauma informed.
“Having further input for specific teams to support the implementation of the knowledge
gained from the training is so important for changing practice and becoming trauma
informed.”
Interestingly, whilst many participants on the trauma training commented that they found it
helpful learning with staff from different services, a few participants who attended the Level 2
training, identified that that they would have benefitted from training that was more tailored to
their specific service and client group. 
The majority of the Training Team also identified, that they thought that it was very important
to continue with a Trauma Training Steering group and also having a person in a lead role to
co-ordinate the training.
“Research from recent 'deep dive' events highlights the need for strategic and senior
management support, which would be ensured through continuation of the steering group.  
This also supports joined up practice across teams/agencies and provides opportunities for
voices of lived experience to influence strategic aims”
Trainers also commented that it would be important to;
 Train more people to become trainers (there was already an interest from mangers
within their service for this) 
 Engage more with managers
0% 20% 40% 60% 80% 100%
Continuing the steering group
Having a Trauma Training Lead
Creating a local Transforming Psychological Trauma
Network/hub
Creating a local Transforming Psychological Trauma
Website
Holding awareness raising events
Focusing on training particular groups/services
Supporting whole teams and services to become
trauma informed
Very important Important Neutral Unimportant  Very Unimportant
Page 321 of 340

Page 322

30 | P a g e
 Broaden the roll out of the training to ensure that it was available to other services, in
particular Adult and Social Care Staff and Children and Families Social Work staff to
be trained to at least level 2. 
Other comments included: having a mutli-professional training team was a positive learning
experience; the level 1 training being included as part of the induction process; and that it is
important to ensure the momentum is not lost. 
Page 322 of 340

Page 323

31 | P a g e
CONCLUSIONS 
Despite the onset of the global pandemic, the Midlothian Trauma Training pilot was
successfully adapted and Level 1 and Level 2 trauma training was delivered remotely, to a
high volume of staff. This encompassed staff with a variety of roles, representing services
which work with people across the lifespan, from statutory and third sector organisations.
Both the training Level 1 and Level 2 was well received by the majority of attendees. 
The support from the Lothian TPTICs was an important aspect of the pilot. The TPTICs
provided access to Training for Trainers, and the use of their training packages and
resources which had been effectively adapted to be delivered remotely due to the pandemic. 
There was a high demand for the Level 1 and Level 2 training evidenced by the number of
bookings during the pilot and enquiries for future training. This demand illustrates an
awareness of the value of having a trauma informed workforce within services, and the need
for further trauma training in Midlothian. 
In terms of the impact of the training, not only did the significant majority of participants gain
an increased level of understanding, knowledge and skills, a significant majority of those
who attended a Level 1 or Level 2 training, indicated that they planned to apply the training
to their work. The Level 1 follow up data showed, that many staff had applied the training to
their jobs and were making trauma informed changes to their working practice. This is
important; it suggests that offering Trauma Training to staff, with a variety of roles and remits
across services, can lead to them making actual trauma informed changes to their working
practice. 
Consideration needs to be given as to how staff and services, can be further supported to
continue to make, and embed trauma informed changes to their work and organisation.  In
the future it would be important to measure the impact of these changes within services and
how the changes are experienced by staff and those who the services. 
The open access model to training worked well for the Level 1 trauma training, with some
participants commenting on the value of hearing and learning from other professional
groups. For the Level 2 training however, some participants and Trainers commented that
the training would have been more effective if it had been tailored specific service remits. 
Trainers and some participants also commented on the benefit of having the experience of a
Page 323 of 340

Page 324

32 | P a g e
range of trainers from different professional backgrounds able to bring their expertise and
experience. 
Whilst training people to increase their knowledge and skills to support people who have a
history of trauma is important, training frontline staff in and of itself is not enough to achieve
meaningful trauma informed change. This is supported by the feedback from participants
which revealed a number of challenges and barriers to implementing trauma informed care.
Participants fed back that they did not feel that there was opportunity within their work to
apply the training, not feeling that they had enough knowledge, and not having space and
time within their job. These barriers illustrate the need for ongoing training and the
importance of considering how staff and managers can be supported to make trauma
informed changes to their work and organisation culture. This could be addressed by
working and supporting services as a whole, to work towards trauma informed organisational
change. 
This would involve working with managers and teams to ensure staff are:
 Staff are trained to the appropriate level.
 Staff are supported through ongoing training and supervision.
 Staff self care and wellbeing systems are in place.
 Workplace policies and procedures are trauma informed. 
There is clearly an interest and need within teams and services in Midlothian for further work
in this area. Staff and services are still contacting the Midlothian Trauma Training Co-
ordinator with requests for further training. There is also a selection of free resources on the
NES Transforming Psychological Trauma website which managers and teams could be
supported to use within their service.   
Whilst there are staff in Midlothian with experience and expertise in this area, all of the
trauma trainers and the People with Lived Experience group agreed, that there was a benefit
to having a person employed in a lead role, to drive the training, to provide consistent,
reliable knowledge of the training and the broader Transforming Psychological Trauma
agenda. The majority of trainers also thought, as a priority going forward, it would be
important to focus on offering training to specific teams, and to work with and support whole
teams to become trauma informed. This was also suggested by some of the training
participants. 
Page 324 of 340

Page 325

33 | P a g e
RECCOMMENDATIONS 
RECCOMMENDATION 1: Continue Trauma Training
Whilst a large number of people in Midlothian have attended Level 1 and Level 2 training,
there is clearly an ongoing need and demand for trauma training to be continued. Going
forward it will be important for the Steering Group to discuss how and which service(s) are
best placed to manage this and also to identify services and groups who would benefit from
adopting a trauma informed approach. 
RECCOMMENDATION 2: Continuation of the Trauma Training Steering Group
The multi-professional steering group, which included representation from a People with
Lived Experience Group, was key in the implementation of the pilot. Representation from
senior people, with different roles and remits, across services and sectors, meant that
consideration could be given as to how the training, could be effectively rolled out to a broad
range of staff within Midlothian. Representation from the People with Lived Experience
Group focused attention on the training packages, how the training was delivered, how it
may be received by attendees. It will be important for the Steering Group to review the
feedback from the training in particular the barriers that people identified to making trauma
informed change and discuss how these can be addressed. 
RECCOMMENDATION 3: Continue and develop the Trauma Training Co-ordinator
Role
A crucial element of the Midlothian Trauma Training was having someone in post as the
Local Trauma Training Co-ordination. This is evidenced by the feedback received from the
trauma trainers. Going forward it would be preferable if this role was continued and
developed further. Consideration needs to be given to the skills and experience required
needed for this role. In addition to linking in with local and national developments, awareness
raising, coordinating future training events, delivering training, supporting the local trainers,
further developments could include:
 Working alongside the local Trauma Champion 
 Engaging with services and mangers to help to make and embed trauma informed
practice changes within peoples jobs
 Supporting services and managers to make trauma informed organisational changes 
 Support and develop meaningful involvement with People with Lived Experience.
 Developing an local on-line platform with Trauma Information and training dates
widely accessible to the workforce and general public.
Page 325 of 340

Page 326

34 | P a g e
RECCOMMENDATION 4: Build Capacity of Trauma Trainers
Having a multi-professional training team was viewed positively by the trainers and training
participants. Trauma training takes time out of people’s busy roles therefore it will be
important to increase the pool of available trainers. Over half of those trained to facilitate the
training were then unable to go on to deliver the training. This was partly due to the impact of
Covid and workplace demands, but it is important to note that trainers self selected without
necessarily having a strong commitment from their service manager. It is therefore important
that there is management commitment and buy in before people are offered a place on a
Train the Trainer event. Future consideration needs to be given to increasing the range of
people who are able to deliver the training to include a more diverse range of people
including those with Lived Experience. 
RECCOMMENDATION 5: Further Develop Opportunities for People with Lived
Experience Involvement
The voice of people with lived experience is important in any initiative. Initial steps were
made in terms of engagement with one group of people with lived experience. The group
were enthusiastic about being involved with the Trauma Training Pilot, and they generated
interesting ideas about how they could further be involved to support this work. Ideas
included co-delivering the training, evaluation and incorporating short videos about people
with lived experience. Going forward it would be important to develop these ideas to further
enrich the training. 
RECCOMMENDATION 6: Management Engagement and Support
Whilst a high proportion of training participants intended to, and then were able to make
trauma informed changes to their job, participants also identified a range of barriers and
challenges. The best chance of integrating trauma informed practice within peoples work is if
managers and leaders fully sign up and engage with this process. There are a number of
freely available resources through the NES Transforming Psychological Trauma website and
resources developed by the Lothian TPTIC’s. A Trauma Training Co-ordinator could usefully
support managers to use the resorces within their organisation and staff teams. 
“We are just glad to know that this training is happening and
appreciate the opportunity to be further involved”
People with Lived Experience Group. 
Page 326 of 340

Page 327

35 | P a g e
The Midlothian Trauma Training Steering Group. 
Margaret Brewer, Linda Clark, Tracey Clusker, Ele Davidson, Sarah Fletcher, Dee
Kieran, Andrew Love, Sheena Lowrie, Tracey MacLeod, Joe Riba Segues, Mairi
Simpson, Kaye Skey, Dr Massimo Tarsia, Alison White. 
References: 
1. NHS Education For Scotland. (2017). Transforming Psychological Trauma: A
Knowledge and Skills Framework for the Scottish Workforce. NHS Education for
Scotland. Retrieved from nationaltraumatrainingframework.pdf
(transformingpsychologicaltrauma.scot) 
2. NHS Education For Scotland. (2019). The Scottish Psychological Trauma Training
Plan. NHS Education for Scotland. Retrieved from trauma-training-plan-final.pdf
(transformingpsychologicaltrauma.scot) 
Page 327 of 340

Page 328

36 | P a g e
Appendix 1: Summary of Level 1 and Level 2 Completed
Questionnaires
Level 1  Pre Post 6 Week 3 Month 
n 369* 241 61 13 
Level 2  Pre Post Module
1
Post Module
2
Post Module
3 
6 week
n 114* 74 59 33 8
*Not all the people who completed the pre traininq questionnaire went on to attend the training. 
Appendix 2: Results of One-Way, Repeated-Measures ANOVA,
Comparing Questionnaire Items 1 and 2, for Level 1 Pre, Post and 6
week follow up Evaluation.
Questionnaire Item  Mean SD N F (df) P ES
1. Being trauma informed is important
and relevant in my job.
Pre 4.37 .598    
Post 4.69 .471    
6-week
FU
4.54 .561       
35 6.6
(2)
0.002 .163*
2. I feel confident in my ability to apply
trauma informed principles in my job. 
Pre 2.94 .924    
Post 4.22 .54    
6-week
FU
4.11 .575       
36 48 (2) .000 .582* 
Appendix 3: Results of Paired Samples t Test, Comparing
Questionnaire Items 3-13, for Level 1 Pre and Post Training
Evaluation.   
Questionnaire Item  Mean SD T df p
3. I understand what people mean
when they use the terms trauma and
complex trauma.
Pre 3.28 .97   
Post 4.59 .556   
-21.4 212 .000
4. I can identify the kinds of
experiences that can be traumatic.
Pre 3.83 .74   
Post 4.58 .523   
-15.5 211 .000
5. I understand the different ways that
trauma can affect people.
Pre 3.69 .77   
Post 4.59 .51   
-17.0 212 .000
6. I understand how to respond to the
people I am in contact with in order to
help them feel safe and supported.
Pre 3.44 .77   
Post 4.42 .61   
-20.4 213 .000
7. I understand what the 5 principles of
trauma informed care are.
Pre 2.26 .88   
Post 4.51 .57   
-34.5 187 .000
8. I feel confident I could use the 5
principles of trauma to support
someone affected by trauma.
Pre 2.33 .93   
Post 4.27 .73   
-27.3 185 .000
Page 328 of 340

Page 329

37 | P a g e
9. I feel confident I could support
people affected by trauma to access
appropriate services and supports to
improve recovery, where needed.
Pre 3.1 .96   
Post 4.3 .67   
-19.7 214 .000
10. I feel as if I understand the
different ways in which I can adapt the
way I work to reduce the risk of
trauma-related distress.
Pre 3.0 .90   
Post 4.35 .65   
-22.5 211 .000
11. I understand the importance of
self-care and support when working
with people who may have been 
affected by trauma. 
Pre 3.74 .87   
Post 4.61 .51   
-15.3 215 .000
12. I am aware of strategies to look
after my wellbeing.
Pre 3.82 .81   
Post 4.62 .51   
-14.5 213 .000
13. I know how I can access further
support in order to look after my
wellbeing, should I need to.
Pre 3.83 .81   
Post 4.54 .53   
-13.0 189 .000 
Appendix 4: Results of One Way Repeated Measures ANOVA,
Comparing Questionnaire Items 1 and 2, for Level 2 Pre and Post
Training Evaluation.   
Questionnaire Item  Mean SD N F (df) p ES
1 Being trauma informed is important
and relevant in my job. 
Pre 4.82 .39    
Post M1 4.76 .44    
Post M2 4.76 .44    
Post M3 4.88 .33       
17 0.5
(3)
.68 -
2. I feel confident in my ability to apply
trauma informed principles in my job. 
Pre 3.71 .59    
Post M1 4.06 .56    
Post M2 4.41 .71    
Post M3 4.65 .61       
17 8.7
(3)
.000 .35 
Page 329 of 340

Page 330

38 | P a g e
Appendix 5: Results of Paired Samples t Test Comparing
Questionnaire Items 3-24, for Level 2, Pre and Post Training
Evaluation.  
Questionnaire Item  Mean SD t df p
3. I understand what is meant by the
terms trauma and complex trauma.
Pre 3.74 .62   
Post  4.56 .60   
-6.88 53 .000
4.I feel confident I can identify the
types of experiences that might be
traumatic
Pre 4.04 .58   
Post 4.48 .72   
-6.70 53 .001
5.I am aware of the prevalence of
trauma in the general population
Pre 3.63 .81   
Post  4.39 .56   
-6.10 53 .000
6. I am aware of the types of services
where people who have experienced
trauma might be over-represented.
Pre 3.50 .82   
Post  4.19 .56   
-5.43 53 .000
7. I understand the factors which might
influence someone’s response to
traumatic events.
Pre 3.76 .64   
Post  4.41 .53   
-5.92 53 .000
8 I understand the possible long term
consequences of experiencing
complex trauma.
Pre 3.79 .70   
Post  4.50 .54   
-6.05 51 .000
9. I understand the short term impact
trauma might have on a person’s body
and brain.
Pre 3.69 .70   
Post  4.43 .54   
-6.40 53 .000
10. I feel confident at using the
concept of the window of tolerance as
a tool to understand how someone
might present to my service
Pre 2.94 .80   
Post  4.29 .64   
-9.28 51 .000
11. I feel confident at identifying some
of the strategies people might use to
cope with traumatic experiences.
Pre 3.48 .82   
Post  4.48 .66   
-7.25 43 .000
12. I understand how I might support
someone to develop helpful ways of
coping
Pre 3.39 .78   
Post  4.36 .65   
-7.64 43 .000
13. I feel confident in how to respond
to someone who discloses information
about a trauma they have
experienced.
Pre 3.57 .76   
Post  4.45 .55   
-8.14 43 .000
14. I understand the factors which
might help someone have a positive
experience of disclosing a traumatic
event.
Pre 3.36 .73   
Post  4.38 .76   
-10.3 41 .000
15. I understand some of the
strategies I could use to practice self-
care and look after my wellbeing.
Pre 3.63 .76   
Post 4.63 .49   
-8.68 42 .000
16. I feel confident I can put some self-
care strategies into practice, should I
need to.
Pre 3.84 .68   
Post  4.59 .50   
-7.64 43 .000
17. I know how I can access further
support in order to look after my
wellbeing, should I need to.
Pre 3.84 .74   
Post  4.53 .55   
-5.63 44 .000
18. I understand what is meant by the
term Trauma Informed Practice.
Pre 3.72 .65   
Post  4.76 .44   
-6.44 28 .000
19. I understand how I might apply the Pre 3.37 .85   
Page 330 of 340

Page 331

39 | P a g e
5 principles of trauma informed care in
my service.
Post  4.63 .56   
-6.42 29 .000
20. I understand the types of changes
that I could make to make my practice
more trauma informed.
Pre 3.48 .74   
Post  4.66 .55   
-7.45 28 .000
21. I feel confident I could use the 5
principles of trauma informed care to
support someone affected by trauma.
Pre 3.33 .80   
Post  4.60 .56   
-6.62 29 .000
I,22.  understand the impact that
trauma can have on how someone
might experience relationships
Pre 3.86 .65   
Post  4.79 .42   
-6.86 27 .000
23. I feel confident in how to trauma
inform my professional relationships.
Pre 3.55 .63   
Post  4.72 .53   
-8.89 28 .000
24. I understand what the important
factors are in supporting recovery from
traumatic events.
Pre 3.32 .72   
Post  4.64 .56   
-8.10 27 .000 
Appendix 6: Results of One Way Repeated Measures ANOVA,
Comparing Questionnaire Items 25-27, for Level 2 Pre and Post
Training Evaluation.   
Questionnaire Item  Mean SD N F (df) p ES
25. The information in this training has
given me a better understanding of the
experiences of people who have been
affected by trauma. 
Post M1 4.35 .61    
Post M2 4.59 .51    
Post M3 4.76 .44       
17 3.2
(2)
.053 -
26. I feel this training will have a
positive impact on how I work with
service users. 
Post M1 4.53 .62    
Post M2 4.59 .62    
Post M3 4.76 .44       
17 1.5
(2)
.242 -
27.  I would recommend this training to
a colleague. 
Post M1 4.88 .34    
Post M2 4.56 .63    
Post M3 4.88 .34       
16 5.3
(2)
0.011 .26 
Page 331 of 340

Page 332

40 | P a g e
Appendix 7: People with Lived Experience Group Online Survey 
Hello, thank you so much for taking a few minutes to complete the anonymous survey.
Your feedback is really important to us in terms of how we develop the Trauma Training
Programme in Midlothian.
We really want you to have a voice in this.
We can use your anonymous feedback in the final report. 
1. Did you attend a Midlothian Trauma Training Pilot Event?
2. If you attended an event, overall, what did you think of the training?
Excellent/Good/Fair/Poor/Very Poor
- What do you think was good about the training?
- What do you think about the training that could be improved upon?
3. What are your thoughts/ideas/suggestions of how People with Lived Experience can
be involved with this training going forward?
- Do you know of any other People with Lived Experience /Service User
groups in Midlothian that it would be good to involve? (If yes, please list)
4. Is there anything about the overall National Education Scotland Transforming
Psychological Strategy or Training plan that you would like to feedback?
5. Please let us know if there is anything else that you would like to feedback back
about the Midlothian Trauma Training Pilot.
6. 
THANK YOU FOR COMPLETING THE SURVEY 
Appendix 8: Trauma Trainers Online Survey  
As part of the Midlothian Trauma Training pilot evaluation we are following up on all the staff
who delivered the training.
It is very important that we capture this information as this will help us develop the training
both locally and nationally.
I would be ever so grateful if you could complete this very short survey. Please be assured
that it is completely anonymous. The information that you give will be used in the final
evaluation report. 
1. What level of training did you deliver?
2. Were there any barriers that you had to overcome to deliver the training?
-It was difficult to find the time within my role
-It was hard to get support from management
-I did not feel confident delivering the training on-line
-Other.. Please give details
3. If you did experience any barriers is there anything that would have helped you to
overcome them?
4. What did you think about the training packages?
Excellent/Good/Fair/Poor/Very Poor  
5. Is there anything that you would change in the training packages?
6. Do you intend to continue to deliver the training after the pilot comes to an end?
Yes/No/Undecided
Page 332 of 340

Page 333

41 | P a g e
7. The Midlothian Steering Group chose to use most of the funding for the pilot to
employ a Programme Lead. We are interested to hear whether you think there was a
benefit to having a person in this role?
Strongly agree (of benefit)/Agree/Neutral/Disagree/Strongly disagree (little
benefit)
Please add comments.
8. Do you see any value of the post of Trauma Training Lead to be continued once the
pilot comes to an end?
Yes, strongly agree/Yes agree/Unsure/No, disagree/ No, strongly disagree
9. We are very interested to hear your thoughts/ideas about how Transforming
Psychological Trauma Training in Midlothian can become further established once
the pilot ends. Please select from the suggestions (you can select more than 1) and
add any other thoughts and ideas below.
- Continuing the Steering Group
- Developing stronger links with People with Lived Experience Groups
- Having a Trauma Training Lead
- Creating a local Transforming Psychological Trauma network/hub
- Creating a local transforming psychological trauma website
- Holding awareness raising events
- Focusing on training particular groups/services
- Supporting whole teams and services to become trauma informed
- Other ideas/suggestions
10. Do you have any other comments/feedback or anything else that you think would be
helpful for us to know? 
Page 333 of 340

Page 334

42 | P a g e
Page 334 of 340

Page 335

Midlothian Council
23 August 2022 
Additions to Family Leave - Pregnancy Loss Pledge and Fertility
Treatment Leave 
Report by Gary Fairley, Chief Officer Corporate Solutions 
Report for Decision 
1 Recommendations 
The Council is recommended to 
i.      Consider committing to the Miscarriage Association’s Pregnancy
Related Pledge, also 
ii.      to further providing paid time off up to 5 days (pro rata) for any
employee who has suffered a miscarriage and for their partner too,
and
iii.      to provide support to employees who have decided to go through
the in-vitro fertilisation (IVF) process and allow 2 days paid leave
(pro rata) per cycle of treatment up to a maximum of 5 days (pro
rata) in a leave year for the employee and their partner. 
2 Purpose of Report/Executive Summary 
The Miscarriage Association is urging employers across the UK to commit to
supporting their staff through the distress of miscarriage. 
They are encouraging businesses and organisations to meet their new
pregnancy loss standard to ensure that employees going through what can be
a very difficult or traumatic time get the support and time off they need. 
To date, amongst others, the British Army, Fife Council, West Dunbartonshire
Council, East Renfrewshire Council and Inverclyde Council have signed up for
the Pregnancy Loss Pledge. 
The standard asks employers to understand and implement the rules around
pregnancy-related leave, create a supportive work environment, to have a
policy or guidance in place, to ensure line managers have access to
resources to help them manage a difficult situation and to support people,
including partners, back to work by showing flexibility wherever possible. 
Item 8.15
Page 335 of 340

Page 336

2.1 Fertility Treatment 
Becoming a parent is one of the biggest steps in life and one of the most
rewarding experiences in the world. For those who cannot conceive naturally,
IVF can quite literally deliver miracles. Sadly, one in six couples will
experience trouble conceiving. 
There is currently no statutory right to paid time off to undergo fertility
treatment, however as a family friendly employer offering a number of options
to working parents, the Council is requested to consider introducing 2 days
paid leave (pro rata) per cycle of fertility treatment, up to a maximum of 5 days
(pro rata) in a leave year for the employee and their partner.
As a reminder, the Council currently provides family leave under the following
headings – maternity leave/adoption leave/shared parental leave/paternity
leave/parental leave/surrogacy leave/parental bereavement leave/foster care
and kinship care leave. 
For information; neonatal leave and pay is expected to become legislation
soon as it had its second reading in Parliament on 15 July 2022.  This will
provide up to an additional 12 weeks statutory leave whilst a premature baby
remains in neonatal care. 
Date: 12 August 2022 
Report Contact: 
Louise Bell, HR Business Partner 
louise.bell@midlothian.gov.uk 
Page 336 of 340

Page 337

3 Background  
3.1 Pregnancy Loss Pledge 
The pain of miscarriage impacts countless lives: One in four pregnancies will
result in this reality. While the emotional and physical ramifications can be
incredibly hard to go through. 
By taking the Miscarriage Association Pregnancy Loss Pledge the Council
agrees to: 
• Encourage a supportive work environment where people feel able to
discuss and disclose pregnancy and/or loss without fear of being
disadvantaged or discriminated against;
• Understand and implement the rules around pregnancy-related leave,
ensuring staff feel able to take the time off they need;
• Show empathy and understanding towards people and their partners
experiencing pregnancy loss;
• Implement a pregnancy loss policy or guidance, or ensure it is included
in sickness, bereavement or other workplace policies – being mindful of
the needs of partners, too;
• Encourage line managers to access in-house or external guidance on
how to support someone experiencing pregnancy loss;
• Support people back to work by being responsive to their needs and
showing flexibility wherever possible. 
If we agree to take the Pledge, we will be issued with marketing information by
the Miscarriage Association to enable us to share this with staff and/or on
social media. 
Campaigning is ongoing by Angela Crawley, SNP MP for Lanark and
Hamilton East to introduce miscarriage leave.
However, in the meantime as well as taking the Pledge, we request that the
Council introduces 5 days of paid leave (pro rata) for any employee who
suffers a miscarriage and to extend this leave to her partner too.  This is a
family friendly approach consistent with all the other family friendly offerings
the Council already has in place. 
3.2 Fertility Treatment 
Employees struggling with fertility problems or going through fertility treatment
should be better supported by the Council. There is currently no statutory right
to take time off work to undergo IVF treatment; however, Fertility Network UK
recommended employers treat fertility issues in the same way as any other
medical issue and provide employees the flexibility they require around
treatments. 
Page 337 of 340

Page 338

Investigations regarding infertility, consultations exploring treatment options
and medical interventions aimed at assisting conception should be regarded
as medical appointments and entitlement to time off to attend such
appointments is covered by the Council’s usual procedures. 
In order to support employees who are going through fertility treatment, the
Council is suggesting to grant 2 days paid leave (pro rata) per cycle of IVF up
to a maximum of 5 days (pro rata) in a leave year.  This will allow the
individual some time to deal with the physical and emotional effects of fertility
investigations or interventions. 
4 Report Implications (Resource, Digital, Risk and Equalities) 
4.1 Resource 
Additional paid time off for individuals if these two categories would be
applicable.  This would clearly have an impact on staffing, this needs to
be weighed up with the wellbeing of staff.   
4.2 Digital 
There are no direct IT implications as a result of this report. 
4.3 Risk 
Whilst there are no direct risks associated with this report, adopting this
guidance should in turn encourage individual’s experiencing
miscarriage or going through the In Vitro Fertilisation (IVF) to feel better
supported and in turn could reduce sickness absence levels if there is
now specific leave for these purposes. 
4.4 Ensuring Equalities 
Providing appropriate support within an individual’s place of work will
better enable equality of opportunity. These interventions have been
identified as having a positive impact on those with protected
characteristics i.e. pregnancy and maternity 
4.5 Additional Report Implications (See Appendix A) 
Appendices 
Appendix A – Additional Report Implications 
Page 338 of 340

Page 339

APPENDIX A – Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Midlothian Council and its Community Planning Partners have made a
commitment to treat the following areas as key priorities under the
Single Midlothian Plan:- 
• Reducing the gap in economic circumstances
• Reducing the gap in learning outcomes 
• Reducing the gap in health outcomes
• Reducing the impact of climate change 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern   
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you
x Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
A.4 Delivering Best Value 
The guidance does not directly relate to the delivery of best value. 
A.5 Involving Communities and Other Stakeholders 
Trade Union colleagues will be notified if approval is received to
proceed. 
Page 339 of 340

Page 340

A.6 Impact on Performance and Outcomes 
Adopting and implementing the guidance will positively impact on the
working lives of Council’s employees and partners who have
experienced miscarriage or are going thorough fertility treatment. 
A.7 Adopting a Preventative Approach 
Adopting and implementing the guidance will help to support
employees in fulfilling their duties. 
A.8 Supporting Sustainable Development 
Adopting and implementing this supportive time off will contribute to our
employee’s wellbeing and inform sustainable development.
Page 340 of 340