Democracy Spraffa

Agenda Document Pack - Midlothian Council - 27/08/2024

Midlothian Council · 27 August 2024
Back to Midlothian Council — 27 August 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Notice of Meeting and Agenda 
Midlothian Council 
Venue:  Council Chambers/Hybrid, 
Midlothian House, Dalkeith, EH22 1DN 
Date:  Tuesday, 27 August 2024 
Time:  11:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone: 
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.Midlothian.gov.uk 
Page 1 of 126

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item and
the nature of their interest. 
4          Deputations 
5          Minutes
5.1 Minute of Midlothian Council 25 June 2024, submitted for approval 5 - 30
5.2 Minute Volume Index - No minutes submitted 
5.3 Action Log 31 - 34 
6          Questions to the Council Leader 
7          Motions
7.1 Reports for Noting 35 - 36 
8          Public Reports
8.1 Financial Monitoring 2024/25 – General Fund Revenue, report by
Chief Financial Officer / Section 95 Officer
37 - 48
8.2 Housing Revenue Account – Revenue Budget and Capital Plan
2024/25, report by Chief Financial Officer / Section 95 Officer
49 - 54
8.3 General Services Capital Plan - 2024/25 Quarter 1 Monitoring,
report by Chief Financial Officer / Section 95 Officer
55 - 66
8.4 The Education (Scotland) Bill, report by Executive Director Children,
Young People and Partnerships
67 - 74
8.5 United Nations Convention on the Rights of the Child (“UNCRC”)
(Incorporation) (Scotland) Act, report by Executive Director
Children, Young People and Partnerships
75 - 82
Page 2 of 126

Page 3

8.6 Children’s Services 2024/25 Service Plan, report by Executive
Director, Children, Young People and Partnerships
83 - 104
8.7 Fair Work First – Implementation Update, report by Chief Officer
Corporate Solutions
105 - 114
8.8 Housing Programme Update, report by Executive Director Place 115 - 126
8.9 Exclusion of Members of the Public
(A) TO CONSIDER RESOLVING TO DEAL WITH THE UNDERNOTED
BUSINESS IN PRIVATE IN TERMS OF PARAGRAPHS 6, 9 AND 11 OF PART
1 OF SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT 1973
- THE RELEVANT REPORTS ARE THEREFORE NOT FOR PUBLICATION;
AND
(B) TO NOTE THAT NOTWITHSTANDING ANY SUCH RESOLUTION,
INFORMATION MAY STILL REQUIRE TO BE RELEASED UNDER THE
FREEDOM OF INFORMATION (SCOTLAND) ACT 2002 OR THE
ENVIRONMENTAL INFORMATION REGULATIONS 2004. 
9          Private Reports
9.1 Mavisbank House – Compulsory Purchase Order, report by
Executive Director Place 
9.2 Beeslack Community High School Replacement – Contract Tender,
report by Executive Director Place 
9.3 Destination Hillend – Alpine Coaster Pricing, report by Executive
Director Place 
10    Date of Next Meeting 
The next meeting will be held on Tuesday 8th October 2024 at 11am. 
Page 3 of 126

Page 4

Page 4 of 126

Page 5

Minute of Meeting 
Midlothian Council 
Date Time Venue
Tuesday 25 June 2024 11:00 am Council Chamber, Midlothian
House/Hybrid 
Present:
Provost McCall (Chair) Depute Provost Bowen
Councillor Parry (Council Leader) Councillor Cassidy (Depute Council
Leader)
Councillor Alexander  Councillor Curran
Councillor Drummond (joined at
11.39am)
Councillor Imrie
Councillor McEwan Councillor McKenzie
Councillor McManus Councillor Milligan
Councillor Pottinger (attended virtually) Councillor Russell
Councillor Scott Councillor Smaill
Councillor Virgo Councillor Winchester 
Religious Representatives:
Anne-Theresa Lawrie 
In attendance:
Dr Grace Vickers, Chief Executive  Kevin Anderson, Executive Director Place
Fiona Robertson, Executive Director
Children, Young People and
Partnerships
Morag Barrow, Director of Health & Social
Care: Midlothian HSCP / Chief Officer to
Midlothian IJB
Alan Turpie, Legal and Governance
Manager / Monitoring Officer
David Gladwin, Chief Financial Officer
(Section 95 Officer)
Janet Ritchie, Democratic Services
Officer
Hannah Forbes, Assistant Democratic
Services Officer   
Midlothian Council
Tuesday 27 August 2024 
Item No 5.1
Page 5 of 126

Page 6

1.   Welcome, Introductions and Apologies
The Provost welcomed everyone to this meeting of the Midlothian Council and
advised that the meeting was open to the public and would be webcast live. 
The Provost welcomed the guests from the twin town of Jarnac and wished them
a very safe journey home with best wishes, repeating this introduction to them in
French. 
The Provost took the opportunity to congratulate Willie Reid, Waste Services 50
years’ service at Midlothian Council. 
The Provost congratulated Chief Superintendent Catriona Paton for promotion to
Assistant Chief Constable and receiving the King’s Policing medal. The Provost
expressed their best wishes on their promotion. 
The Provost also recognised in the King’s Birthday Honours List Dr Jasmin Paris.
The ultra runner received an MBE. The Provost also recognised Alastair Davis,
Social Investment Scotland, who received an OBE and Professor Donald
Campbell from Edinburgh University who was awarded an OBE for services to
music and expressed congratulations to all recipients. 
2.  Order of Business 
The order of business was as per the agenda previously circulated. 
3.  Declarations of interest   
None.
4.  Deputations 
A late deputation was received from the Midlothian Federation of Community
Councils. The Provost asked Council whether it wished to hear the deputation.  
The Council unanimously agreed, and the Provost invited the representative
from the Midlothian Federation of Community Councils to speak advising that
they had 10 minutes to present. 
The Document MLDP2 Midlothian new Housing Target 2026-2036 was
distributed. 
Stephen Liddell thanked the Council for hearing the deputation. Mr Liddell
explained that they were representing the Midlothian Federation of Community
Councils to raise its concerns relating to the recent housing allocation decision
which forms part of the MLDP2. The representative stated that in November
last year, following widespread public consultation with fifteen community
councils the Federation wrote to the Planning Service and all Councillors
expressing serious concerns regarding the further allocation of new housing
sites being allocated in MLDP2. 
Page 6 of 126

Page 7

The view of the Federation was that, while it shares concerns over the impact
of additional housing on local infrastructure, it believed there was still a need for
properly affordable housing, particularly for young people starting out on the
housing ladder. It also requested a dialogue with Planning Officers on the types
of housing that are approved and whether they are appropriate for their
community.   
The representative stated that the decision made by the Planning Service
regarding the housing numbers was misleading and that the Federation request
this be raised today, and further information was contained within the document
which was distributed in the Council Chamber prior to the deputation. (‘MLDP2
Midlothian New Housing Target 2026-2036’, appended to the minute). 
The representative further explained the table of numbers in the handout
stating that the numbers were from the evidence report, the 2023 housing land
audit and the 2023 Scottish Government’s vacant and derelict land survey and
the Scottish Government’s target was for 8,850 houses. The representative
stated that several categories of new housing were not included in these
numbers which was windfall sites, constrained sites, impact of densification of
sites and brownfield sites.  The representative continued on to say that the
decision made by the Planning Service  to completely exclude all these sources
of new housing from the forecast summary is misleading, stating that  if the
brownfield sites were disregarded, the total is 10,900, then with an extra 2000
houses added which was agreed by the Planning Committee, the total
becomes 12,900.  The representative stated that this is a 4,000 surplus over
the target, which equates to 45% more new houses than the Scottish
Government request.   
The Provost thanked Mr Liddell and opened it up to Members for questions. 
Councillors asked whether officers could respond to some of the points raised,
with regards to the implication that Planning Officers moved policy due to
pressures by developers.  The Legal and Governance Manager advised that
the Deputations Process did not state a position on this and suggested that
questions were taken at this time and that the relevant officers who were in the
Council Chambers were given the opportunity to respond to these points and
also stated that this would, if required and appropriate, allow the Federation to
further respond.  The Provost reminded Members that there was 10 minutes
allocated for questions and answers. In responding to a further question from
Members about the appropriateness of this discussion the Legal and
Governance Manager confirmed that this was a policy strategy matter,
therefore the quasi-judicial rules do not apply. 
The Chief Officer, Place and the Planning, Sustainable Growth and Investment
Senior Manager responded to each of the points. The Chief Officer Place
started by highlighting the good relationship and engagement that the Council
had with Community Councils and the Federation throughout the consultation
and engagement process of the local development plan and that the term
misleading was disappointing and unjustified. 
Page 7 of 126

Page 8

The Planning, Sustainable Growth and Investment Senior Manager responded
to the all the points raised by the Federation of Community Councils stating the
that the figures presented to members in October 2023, November 2023 and
June 2024 were correct and provided an explanation on the variation and why
the figures presented by the Federation in the handout are incorrect.  
The Planning and Sustainable Growth and Investment Senior Manager
explained why windfall sites and constrained sites are excluded and provided
clarification on densification. They went on to respond to the other points
including the additional burden because of development, housing numbers and
surpluses, the allocation of new sites and how this is considered in relation to
existing sites in the plan and the final point about smaller sites or smaller
allocations.  The Planning and Sustainable Growth and Investment Senior
Manager confirmed that Planning Officers are working closely with Homes in
Scotland and explained that there is a requirement in MPF4 under regulations
that the Council negotiate and engage with all relevant parties, whether they
are key agencies or communities, and the Council have been doing this.  It was
explained that there had been disagreements between the Planning Authority
and Homes in Scotland, which is the umbrella group that represents the
housebuilding industry, and this is set out in the Evidence Report. 
The Provost asked if there were any further questions. 
The representative was asked if the explanation by the Planning Sustainable
Growth and Investment Senior Manager gives a better understanding of the
dispute with regards to the figures. The representative commented on the
individual numbers put together and the total figure. The representative further
highlighted although windfall sites are unpredictable, they still occur and stated
that alongside brownfield sites and constrained sites these should all be
included in the summary and that all numbers are in the report, and this should
be looked at in more detail and see what can be produced. 
11.31am – The Representative from the Federation of Community Councils and
the guests from the twin town of Jarnac left the Council Chamber. 
5.  Minutes of Previous Meetings 
Item No. Report Title Submitted by:
5.1 Minute of Midlothian Council of 7 May
2024
Executive Director Place
Outline and Summary of Discussion 
Councillor Pottinger intimated his apologies for the last meeting of Council when
he mistakenly had his camera on whilst eating and drinking. Councillor Pottinger
advised that this was not intentional and did not mean to cause upset and hoped
that the council would accept his apologies. 
The Provost thanked Councillor Pottinger and was happy to accept their apologies
on behalf of the Council. 
Page 8 of 126

Page 9

The Minute of the Special Meeting of Midlothian Council held on the 7 May 2024
was submitted for approval, moved by Councillor Parry and seconded by Councillor
McManus.
Decision
The Minute of the Meeting of Midlothian Council held on 7 May 2024 was
approved.
Action
Democratic Services 
Item No. Report Title Submitted by:
5.2 Minute Volume Index  Executive Director Place
Outline and Summary of Discussion 
The following minutes were previously circulated to Elected Members and
subsequently noted and/or the recommendations contained therein approved: 
• Minute of Police Fire and Rescue Board Meeting of 29 January 2024
• Minute of Cabinet Meeting of 5 March 2024 
• Minute of Planning Committee Meeting of 12 March 2024 
• Minute of General Purposes Committee Meeting of 19 March 2024 
• Minute of Performance, Review and Scrutiny Committee Meeting of 
19 March 2024
• Minute of Local Review Body Meeting of 25 March 2024
• Minute of General Purposes Committee Meeting of 30 April 2024
• Minute of Planning Committee Meeting of 30 April 2024
• Minute of the Special Planning Committee Meeting of 21 May 2024
• Minute of MIJB Audit and Risk Committee Meeting of 7 March 2024
Moved by Councillor Parry and seconded by Councillor McManus.
Decision
Minute Volume Index was noted.
Action
Democratic Services 
Page 9 of 126

Page 10

Item No. Report Title Submitted by:
5.3 Action Log Executive Director Place
Outline and Summary of Discussion
In responding to a question raised with regards to Item 5 Tenancy Agreement, The
Executive Director Place confirmed that a briefing will be held post recess and will
combine Tenancy Agreement and Anti-Social Behaviour.
Capital Plan Prioritisation (item 1) was also raised, and several Councillors
expressed their frustration that they still did not have a completion date and that they
required assurances on an exact date so decisions could be made.  The Executive
Director Place advised that this would be post recess and advised that officers were
aiming to present this to August Council, but this may be September, and outlined
the work in progress and the elements which are contributing to the delay.   Further
comments were made with regards to the budget gap and the Capital Plan was
required to be presented to Councillors to allow them to understand the Council’s
affordability. The Executive Director Place in responding provided an outline of the
ongoing work to date, confirmed that business cases were progressing and as soon
as the final Plan was ready it would be presented in a meaningful and factual format
to allow Councillors to make those informed decisions.
A further question was raised with regards to the interlinking nature of the Capital
Plan Prioritisation and the Medium-Term Financial Strategy. The Chief Financial
Officer, in responding, advised that in terms of the budget gap there are a number
of levers which can be used by the Council for financial sustainability and one of
these was to reduce capital expenditure. It was also highlighted that Audit Scotland
would continue to comment on the Council not being financially sustainable whilst
there is a budget gap and that officers need to come forward with viable options to
allow Councillors to make decisions.
Decision
The Action Log was noted.
Action
Democratic Services 
During the above discussion Councillor Drummond joined the meeting at 11.39 am 
6.  Questions to the Leader of the Council 
None received. 
Page 10 of 126

Page 11

7.  Motions 
Report No. Report Title Submitted by:
7.1 School Uniforms Councillor Drummond and
Councillor Curran
Outline and Summary of Discussion 
The Notice of Motion was proposed by Councillor Drummond and seconded by
Councillor Curran.
Councillor Drummond and Councillor Curran spoke in support of this motion
explaining that in the past, Midlothian Council agreed to introduce school uniforms
to schools and the reasons for this as contained within the Motion. The motion
outlines that embroidered items were much more expensive to purchase and
examples the expense of this and the issues this cause families. 
Discussion took place with regards to the costs of the embroidered uniforms, and it
was noted that some parents would already have purchased their uniforms. It was
also noted that some families will not be able to afford these embroidered uniforms. 
Comments were expressed in support of this motion but also with regard to further
work being carried out to ensure the voices of the schools, families and young
people are heard.  It was suggested that a report was taken to the Cost of Living
Task Force for further discussion and update on actions. It was noted that a
consultation was in progress with parents, young people and schools and that
discussions were ongoing at COSLA and Scottish Government, but Members stated
that this ongoing national work should not hold up the Council adopting non-
embroidered clothing. 
Further discussion took place around the holistic approach and the barriers in
accepting this motion today. It was also noted that there was no procurement for
school uniforms at present by the Council. Further comments were expressed in
support of this motion.
Decision
The Notice of the Motion was moved.
Action
Executive Director Children, Young People and Partnerships to notify schools to
ensure this position is adopted for the school term following summer recess. 
Page 11 of 126

Page 12

Report No. Report Title Submitted by:
7.2 Midlothian Indoor Bowling Club Councillor Curran and
Councillor Russell
Outline and Summary of Discussion 
The Notice of Motion was proposed by Councillor Curran and seconded by
Councillor Russell.
Councillor Curran and Councillor Russell spoke in support of this motion praising
Midlothian Men’s Indoor Bowling Team’s successive Scottish Premier League and
Scottish Cup wins. It was also noted that the level of competition and the number of
elite bowlers in Scotland (including Midlothian) was a fantastic achievement.
Council agreed to write to the team to congratulate them on their incredible success. 
Decision
The Notice of the Motion was moved and agreed that Council will write to the team
to congratulate them on their incredible success.
Action
Chief Executive/Leader of the Council 
Report No. Report Title Submitted by:
7.3 Gala Days Councillor Parry and
Councillor Scott
Outline and Summary of Discussion 
The Notice of Motion was proposed by Councillor Parry and seconded by Councillor
Scott.
Councillor Parry and Councillor Scott spoke in support of this motion highlighting
the dedication and hard work of volunteers and the community to organise gala
days and children’s days across Midlothian, commenting that the gala days this
year were excellent. The Motion recognises that these events are an important
part of the culture of Midlothian and congratulates the event organisers on their
outstanding success. 
Also highlighted in the Motion was the hard work undertaken by young people,
parents, carers, schools, local businesses and Midlothian Council staff to make
these events happen. 
Councillors spoke in support of this motion highlighting all the work done by the
volunteers across Midlothian and the importance of gala days in bringing the
community together. 
Several Councillors declared transparency with working with gala day committees
and other local community committees and spoke in favour of this motion. It was  
highlighted that gala days are mainly run by volunteers and the question was
raised on sustainability, in particular if the main volunteers running these events
moved on what would then happen to the future of the gala days and queried if 
there was something which could be done by the Council to support these
Page 12 of 126

Page 13

volunteers.  It was also noted the good work done by council employees in
supporting the community with these events.
Decision
The Notice of the Motion was moved.
Action 
Report No. Report Title Submitted by:
7.4 Volunteer Week Councillor McCall and
Councillor McManus 
Outline and Summary of Discussion 
The Notice of Motion was proposed by Councillor McCall and seconded by
Councillor McManus.
As the motion was moved by the Provost, the Depute Provost assumed the position
of Chair for this item.
Councillor McCall in speaking in support of this motion, commented positively on
Volunteer Week. As Midlothian’s Volunteer Champion, the Provost explained how
they enjoyed assisting in the award ceremony where many adults and young people
received awards and gave recognition to the number of people from many
organisations who supported this event. Councillor McCall also expressed their
congratulations to Lorna Greig, a volunteer from girl guiding who won the dedicated
service to volunteering. Lorna has volunteered for 57 years. The Provost
commented on the number of volunteers who have done this for many years and
congratulated all volunteers. Councillor McManus formally seconded this motion and
added their congratulations to all volunteers who received an award and commented
positively on the number of young people involved in volunteering.
Councillor Parry paid tribute to a volunteer, Shiela Broadfoot who recently passed
away and did a lot of voluntary work in the Woodburn area and was a huge support
to many people especially during the Miner’s strike.
Decision
The Notice of the Motion was moved.
Action 
Page 13 of 126

Page 14

8.  Reports 
Report No. Report Title Submitted by:
8.1 Financial Monitoring 2023/24 – General
Fund Revenue
Chief Financial Officer/
Section 95 Officer
Outline and Summary of Discussion 
The Chief Financial Officer/Section 95 Officer presented the report. The purpose of
this report was to provide Council with information on performance against service
revenue budgets in 2023/24 and to provide commentary on areas of material
variance against budget. The budget performance figures as shown in Appendix 1
result in a net underspend of £0.134 million which is an improvement of £0.006
million from projections at quarter 3. The underspend represents 0.05% of the
revised budget. The Chief Financial Officer advised on a typo at the top of p42 of
the report at the end of item 3.3. which referred to planning fees exceeding budget
by £0.181 million but explained that this was the Q3 figure and should not have
been included in this report. 
Council is recommended to note the contents of the report.
The Provost thanked the Chief Financial Officer for the report and opened it up for
questions and comments. 
In responding to a comment from Councillor Parry with regards to a paper being
brought back in August, the Chief Financial Officer confirmed that the paper
regarding Dalkeith Office Campus was still scheduled to be reported to Council in
August. 
Members highlighted concerns around the overspends in fleet due to the hiring of
vehicles and the importance of the Capital Plan coming to Council for decision and
the review of transport requires to be progressed, however it was also
acknowledged that there were some positive messages in the report. 
In responding to a question regarding housing revenue benefit overpayment, the
Chief Officer Financial explained there is a complex rule to determine what is
included in the calculation and at the end of every financial year there is a slight
variance between what was budgeted for. 
There followed a discussion regarding Hillend and the Alpine Coaster and the
Chief Financial Officer advised that there was no income received in the last
financial year hence the variance and advised on some of the issues that caused
the delay of the opening of the Alpine Coaster. It was further advised that the
Hillend Project was on pause and that this was imposed while the business cases
were being looked at and that the Hillend Project was getting redesigned to
something which was affordable, it was also noted that there was no income for
23/24 due to delays in the programme but some of the loss of income may be
recompensed. 
Following a further question with regards to the total overspend and underspend
the Chief Financial Officer advised that the in - year the overspend was £2.937
million offset by loan charges and some minor variances and Scottish Government
grant.  Members queried why variances explained in the main text of the report do
Page 14 of 126

Page 15

not add up to the total overspend. The Chief Financial Officer explained that these
were only the material variances against budget and the full variance, at service
level, is shown at Appendix 1. In responding to a comment on Loan Charges, the
Chief Financial Officer explained the positive variance for Loan Charges was for a
couple of main reasons - the value of surplus cash and the high interest rate
environment and a delay in capital expenditure. 
Decision
The Council noted the contents of this report.
Action
Chief Financial Officer/Section 95 Officer 
Report No. Report Title Submitted by:
8.2 Housing Revenue Account Chief Financial
Officer/Section 95 Officer 
Outline and Summary of Discussion 
The Chief Financial Officer/Section 95 Officer presented the report. The report
provides Council with: 
• The final outturn position for 2023/24 for both the Housing Revenue Account
(HRA) Capital Plan and the Revenue Account. 
• A revised capital plan for 2024/25 to 2026/27 reflecting the cross-year budget
movements and the latest capital plan delivery programmes.
The summarised financial performance for 2023/24 is:
• Capital investment in the year totalling £50.412 million. 
• A net overspend of £1.479 million on the Revenue Account;
• An HRA reserve at 31st March 2024 of £33.181 million, the majority of which
is committed to finance investment in the new build programme.
Council is recommended to note the contents of the report.
The Provost thanked the Chief Financial Officer/Section 95 Officer for the report and
opened it up for questions and comments.
In responding to a question raised with regards how Midlothian is affected by the 
£196 million cut in the housing programme and the additional housing programmes,
the Chief Financial Officer advised that the Scottish Government will no longer fully
fund the affordable housing supply programme. 
Decision
The Council noted the contents of this report.
Action
Chief Financial Officer/Section 95 Officer 
Page 15 of 126

Page 16

Report No. Report Title Submitted by:
8.3 General Services Capital Plan 2023/24
Final Outturn.
Chief Financial
Officer/Section 95 Officer
Outline and Summary of Discussion 
The Chief Financial Officer/Section 95 Officer presented the report.  The purpose
of this report was to provide Council with: 
• Information on the final outturn performance against budget for 2023/24
(Section 3.1-3.5);
• An update on the capital fund balance at 31 March 2024 (Section 4).
Council is recommended to note the General Services Capital Plan outturn position
for 2023/24 as set out in Section 4.
The Provost thanked the Chief Financial Officer/Section 95 Officer for the report and
opened it up for questions and comments.
There being no questions raised the recommendations were noted.
Decision
The Council noted the contents of this report.
Action
Chief Financial Officer/Section 95 Officer 
Report No. Report Title Submitted by:
8.4 Annual Treasury Management Report
2023/24
Chief Financial
Officer/Section 95 Officer
Outline and Summary of Discussion 
The Chief Financial Officer/Section 95 Officer presented the report.  The purpose
of this report was to inform members of the Council of the Treasury Management
activity undertaken in 2023/24 and the year-end position.
It was noted that the Audit Committee scrutinised the report on 24 June 2024. 
Council is recommended to note the Annual Treasury Management Report 2023/24.
The Provost thanked the Chief Financial Officer/Section 95 Officer for the report and
opened it up for questions and comments.
Councillor Virgo commented on the positive report and passed their thanks and
congratulations on the loan charges being significantly less than the Scottish
average and states that this is a testament to the work that had taken place.
Decision
The Council noted the contents of this report.
Page 16 of 126

Page 17

Action
Chief Financial Officer/Section 95 Officer 
Report No. Report Title Submitted by:
8.5 Internal Audit Shared Service
Arrangement Continuation
Chief Executive
Outline and Summary of Discussion 
The Chief Executive presented this report advising that this had been presented to
Audit Committee on 24 June 2024. The purpose of the report was to provide Council
with the appraisal of the first 18 months of the Shared Service arrangement for the
Chief Internal Auditor between Midlothian and East Lothian Council. Significant
budget savings have been delivered within the Internal Audit and Counter Fraud
team over the 18-month period whilst continuing to deliver a service that meets the
requirements of the Public Sector Internal Audit Standards (PSIAS).
Council is recommended to:
a) Note the agreement of Midlothian Council Audit Committee on 24 June
2024, following the 18-month initial period, to the continuation of the Chief
Internal Auditor Shared Service on an ongoing basis.   
b) Approve the continuation of the Chief Internal Auditor Shared Service
between Midlothian and East Lothian Council on an ongoing basis.  
c) Note that flexibility will be considered as part of the ongoing Internal Audit
annual planning process to widen the agreement to the sharing of Internal
Audit and Counter Fraud resource staffing, when the potential allows. 
The Provost thanked the Chief Executive for the report and opened it up for
questions and comments.
Moved by Councillor Parry, seconded by Councillor Smaill.
Decision
The Council approved the recommendations as stated in the report.
Action
Chief Executive 
Report No. Report Title Submitted by:
8.6 Cost of Living Update Chief Officer Corporate
Solutions
Outline and Summary of Discussion 
The Chief Officer Corporate Solutions presented this report. The purpose of this
report was to provide Council with options for future poverty reduction interventions
and associated costs. 
Council is asked to:
Page 17 of 126

Page 18

• Note the research and analysis of findings related to poverty as set out at
3.3-3.7.
• Recognise the significant work undertaken around employability support as
set out at 3.8-3.11.
• Agree to fund £462,500 to support Cost of Living interventions detailed in
3.22-3.24, from COVID recovery funds. 
• Agree to delegate authority of allocation of funding to the Cost of Living Task
Force.
The Provost thanked the Chief Officer Corporate Solutions for the report and opened
it up for questions and comments.
Councillors commented positively on the report and the collaborative work in the
cross-party Cost of Living Task Force and also noted the income maximisation
figures and the money this has brought in for the people in Midlothian.
Moved by Councillor Parry, seconded by Councillor Virgo.
Decision
The Council approved the recommendations as stated in the report.
Action
Chief Officer Corporate Solutions 
Report No. Report Title Submitted by:
8.7 Replacement Beeslack Consultation Executive Director,
Children, Young People
and Partnerships
Outline and Summary of Discussion 
The Executive Director, Children, Young People and Partnerships presented the
report. This report advised on the outcome of the statutory consultation on the
proposal to relocate Beeslack Community High School and realign the associated
primary catchment areas as well as the secondary catchment areas of Penicuik
and Lasswade High Schools and seeks approval for the recommendations.
Council is recommended to approve the following: 
i. Beeslack Community High School will be relocated from its current site to
land adjacent to Easter Bush from August 2026 or as soon as possible
thereafter;
ii. A new additional support needs (ASN) stage will be established at Beeslack
Community High School when the school opens in August 2026 or as soon
as possible thereafter; 
iii. The catchment area of Beeslack Community High School will be realigned to
include the catchment areas of Loanhead and Paradykes Primary Schools;
Page 18 of 126

Page 19

iv. The catchment area of the closed Glencorse Primary School will be
realigned to the Mauricewood Primary School catchment area; 
v. The catchment area of Penicuik High School will be realigned to include the
catchment areas of Mauricewood and the closed Glencorse Primary
Schools;
vi. A new ASN stage will be established at Penicuik High School.
The Provost thanked the Executive Director, Children, Young People and
Partnerships for the report and opened it up for questions and comments.
Councillor Scott in moving the paper, commented positively on the new school and
raised a question with regards to safe routes to the schools and the ASN facility as
well as the transition to these schools. The Executive Director, Children, Young
People and Partnerships confirmed that safer routes and traffic management will be
established and provided an update on the work ongoing with Midlothian Travel
Team and Lothian Buses and confirmed that they will continue to engage with key
stakeholders to share updates on the safer routes to school.
With regards to the provision for complex and medical needs the Executive Director,
Children, Young People and Partnerships advised on the specialist architect who is
part of the project team to ensure that these needs are considered in terms of the
design of the facility.
Members commented that while a new school would be welcome without having all
the available information it is difficult for the Council to decide on the
recommendations proposed and it was suggested that this item is deferred for
decision at a later date. It was further highlighted that school estate condition
surveys were still outstanding, and it was also noted the last time the Learning Estate
Strategy was discussed there has been changes to the school estate with the
removal of schools. It was also noted that this is one of the biggest spends the
Council will make in 25 years and Members require all the information to make this
decision.
Councillor Parry in seconding the recommendations, commented in support of this
being progressed and that a debate had taken place last year when the new school
was approved.
In responding to a question raised the Executive Director Children, Young People
and Partnerships confirmed that the recommendation was to approve the new
Beeslack High School being relocated to Easter Bush and to change the catchment
areas which would require a new build. The Executive Director Children, Young
People and Partnerships explained that the legislation states as there are changes
in the Learning Estate the Education Authority must carry out a new consultation in
relocating that school even although the new school build was previously approved
by the Council.  The Executive Director Place advised that the Council’s capital
funding would be £75.64 million, expected developer’s contributions to the Council
of £23.07 million and the Scottish Learning Estate Investment Programme funding
of £17.1 million, totalling the £115.8 million for the project. 
There followed a debate on the new school and whether the Council has
contractually committed to already to building a new Beeslack School and if not is
Page 19 of 126

Page 20

there an alternative option for Members to consider. The Executive Director Place
advised on the two-stage procurement process -  the first stage being pre-
construction services and is a low value and does not breach the position that the
Council took for the  £6 million spend limit and confirmed once the Council
proceeded on to the main contract work stage this would exceed £6 million, and this
would be brought back to Council and confirmed there would be no contractual
penalty at this time.  The Executive Director Place further advised in terms of
abortive costs those are estimated at approximately £3 million. The Executive
Director Place also advised on the building condition surveys for the schools and
advised the High School surveys are complete, but the Primary School surveys are
still in progress, and they would come forward as part of the Capital Plan. In terms
of Beeslack the estimated total over the next 3 years would amount to 5.1 million in
terms of suitability and condition work that would be required at the existing school. 
The Executive Director Place confirmed that in contractual terms the Council is not
committed beyond what is agreed today and the tender report would be brought
back to Council and with regards to the terminology of recommendations 1 and 2
they  advised this would need to be deferred to the Monitoring Officer in terms of
what commitments they may lead to. 
Further comments were raised with regards to the school not being developed and
the reputational damage to the Council as well as the impact this will have on the
community. 
The Executive Director Children, Young People and Partnerships with regards to
the question raised on the Edge Analytics pupil product validation provided an
explanation on the work undertaken to date. It is estimated to take 4-6 weeks and
confirmed that they had benchmarked against other Local Authorities in terms of
methodology to check the current figures.
The Provost moved to a vote advising that the recommendations were moved by
Councillor Scott, seconded by Councillor Parry.
On a vote being taken 10 voted for the recommendations and 7 against the
recommendations with 1 abstention.
Decision
The Council approved the recommendations as stated in the report.
Action
Executive Director, Children, Young People and Partnerships 
The Meeting adjourned for lunch at 1.05pm and reconvened at 1.25 pm.
The Provost welcomed the Head Teachers, Ms Walker and Ms McGuire from 
St Mary’s Primary School and St Luke’s Primary School. 
Report No. Report Title Submitted by:
8.8 Mayfield Early Learning Centre
Consultation
Executive Director,
Children, Young People
and Partnerships
Outline and Summary of Discussion 
Page 20 of 126

Page 21

The Executive Director, Children, Young People and Partnerships presented the
report. This report advised on the outcome of the statutory consultation on the
proposal to close Mayfield Nursery School and re-designation to Mayfield Early
Learning Centre and seeks approval for the recommendations.
Council is recommended to approve the following: 
• The closure of Mayfield Nursery School from August 2025 or as soon as
possible thereafter; 
• Mayfield Early Learning Centre will be established from August 2025 or as
soon as possible thereafter; 
• Mayfield Nursery School will be closed and re-designated to Mayfield Early
Learning Centre within the Mayfield Learning Community Campus;
• The Speech and Language Communication provision hosted within Mayfield
Nursery School will close with effect from August 2024 or as soon as
possible thereafter;
• The re-designation of Mayfield Nursery School to Mayfield Early Learning
Centre will take effect from August 2025 or as soon as possible thereafter; 
• The new Mayfield Early Learning Centre will be under the leadership of the
Head Teacher of St Luke’s RC Primary School
The Provost thanked the Executive Director, Children, Young People and
Partnerships for the report and opened it up for questions and comments.
In moving the report Councillor Scott commented positively on the indoor and
outdoor facilities and highlighted that the Speech and Language Service would be
offered as an outreach service. In responding to a question with regards to the
Nursery arrangements the Executive Director Children, Young People and
Partnership advised that they have been proactive in meeting with the families
concerned and that the same staff team will work with the children to support the
transition and that they will continue to liaise with families at an individual level to
ensure they are supported during this period of transition.
Councillor McKenzie in seconding the motion spoke positively with regards to this
change and added that this is supported by the community.
The Executive Director Children, Young People and Partnerships in responding to
a further question provided clarity on the balance of the range of provisions that
Head Teachers lead and mange within each establishment. They explained that
the proposed new Mayfield Primary School will have a new Additional Support
Needs provision and there will be non-denominal early learning childcare at St.
Luke’s, and this ensures that both schools provide an educational service out with
mainstream education.   The Executive Director Children, Young People and
Partnerships further advised that collaboration is encouraged as a campus, and
this does not impact on the identity of each school in terms of learning and
teaching and is seen as good practice.  They further explained the benefits for the
children in providing an outreach Speech and Language Service and also that this
will build the capacity of staff within mainstream schools who support children that
require speech and language communication support.  
Page 21 of 126

Page 22

In responding to a follow up question with regards to setting dates, the Executive
Director Children, Young People and Partnerships provided an explanation
advising that in terms of statutory consultation when it relates to a new build it is
good practice to identify a date  as soon as possible thereafter and that this is
something that is done nationally and allows for any delays. 
Ms Smith, the Quality and Improvement Officer for the Speech and Language
Service joined the meeting and provided clarity that the level of support the
children receive will continue and in providing assurances advised on discussions
that are taking place with NHS speech and language therapy support and the
Mayfield speech, language and communication team and that each child will have
a package of care with targets and outcomes and that will continue when they
transfer to this new model.  The Executive Director Children, Young People and
Partnerships in responding to a further comment confirmed that the Speech and
Language Service is a Midlothian wide service and there is no catchment area. 
Moved by Councillor Scott, seconded by Councillor McKenzie
Decision
The Council approved the recommendations as stated in the report.
Action
Executive Director, Children, Young People and Partnerships 
Report No. Report Title Submitted by:
8.9 Mayfield Additional Support Needs
Consultation
Executive Director,
Children, Young People
and Partnerships
Outline and Summary of Discussion 
The Executive Director, Children, Young People and Partnerships presented the
report. This report advised on the outcome of the statutory consultation on the
proposal to establish a new Additional Support Needs (ASN) stage at Mayfield
Primary School on the new Mayfield Learning Community Campus and close the
Speech and Language Communication provision within Mayfield Primary School
and seeks approval for the recommendations.
Council is recommended to approve the following: 
i. A new Additional Support Needs (ASN) stage will be established on the
Mayfield Learning Community Campus; 
ii. The ASN stage will be under the leadership of the Head Teacher of Mayfield
Primary School; 
iii. The Speech and Language Communication provision hosted within Mayfield
Primary School will close with effect from August 2024 or as soon as
possible thereafter;
Page 22 of 126

Page 23

iv. The Speech and Language Communication provision hosted within Mayfield
Nursery School will close with effect from August 2024 or as soon as
possible thereafter; 
v. The Speech and Language Communication provision will move to an
outreach service from August 2024 or as soon as possible thereafter.
The Provost thanked the Executive Director, Children, Young People and
Partnerships for the report and opened it up for questions and comments.
Councillor Scott in moving the report commented positively on the specialist
provision and that the existing buildings will be replaced with a new state of the art
campus and community facilities in the heart of Mayfield. It was also noted that
communication with stakeholders was very important, and Members requested that
the staff undertake training from the outreach service.
Councillor McKenzie formally seconded the report.
Councillor Virgo also commented on the incorrect terminology ‘Her Majesty’s
Inspectors of Education’.
Councillor Scott moved the report, seconded by Councillor McKenzie.
Decision
The Council approved the recommendations as stated in the report.
Action
Executive Director, Children, Young People and Partnerships 
It was noted that Mr Campbell Hornell, Head Teacher, Lasswade High School
Centre was available on MS Teams for any questions. 
Report No. Report Title Submitted by:
8.10 Lasswade High School Childcare
Service - Consultation
Executive Director,
Children, Young People
and Partnerships
Outline and Summary of Discussion 
The Executive Director, Children, Young People and Partnerships presented the
report.  Under the Schools (Consultation) (Scotland) Act 2010 any proposal to
permanently discontinue all nursery classes in a school require a statutory
consultation. The purpose of this report was to seek approval for the
recommendation outlined above, that Council approve the undertaking of statutory
consultation on the closure of Lasswade High School Childcare Service.
Council is recommended to Authorise the Executive Director Children, Young
People and Partnerships to undertake statutory consultation on the proposal to
close Lasswade High School Childcare Service, which is treated as a closure
under the Schools (Consultation) (Scotland) Act 2010. 
Page 23 of 126

Page 24

The Provost thanked the Executive Director, Children, Young People and
Partnerships for the report and opened it up for questions and comments.
Cllr Scott in moving the report noted the number of children in the setting was low
and asked what transition arrangements would be in place to move young children
to another early years childcare setting if the Lasswade setting closed. The
Executive Director Children, Young People and Partnerships explained that the
school has found it extremely difficult to achieve the income target and that if this
was taken out of the school and manged by the Local Authority or partner provider
it would become more viable in terms of the hours it could operate. It was also
explained that with regards arrangements for Parent/Carers there would be close
contact with them ensuring that the correct communication is provided around the
longer term and that they would be fully involved in the consultation process.
Councillor Virgo in seconding the report asked what would happen to this space and
the Executive Director Children, Young People and Partnerships advised that they
would look to retain the space as an early learning and childcare space and once
the outcome of the consultation was known all options will be considered before a
decision is made on utilising the space.
A further question was raised with regards to who uses this provision, and it was
confirmed that this was used by a mix of members of the public and Midlothian staff.
Councillor Scott moved the report, seconded by Councillor Virgo.
Decision
The Council approved the recommendations as stated in the report.
Action
Executive Director, Children, Young People and Partnerships 
Also in attendance during this report were High School Head Teachers – Mr Hornell,
Mr MacDonald, Mr Biddick and Mr Nicol. 
Report No. Report Title Submitted by:
8.11 Attainment Update for Secondary
School leavers in Midlothian
Education Chief Operating
Officer
Outline and Summary of Discussion 
The Executive Director, Children, Young People and Partnerships presented this
report and advised that the Secondary Head Teachers were also present online to
answer any questions.
The purpose of this report was to present the annual update on leavers attainment
for Midlothian, from the Senior Insight Update. This provides the achievement for
our young people at the point of leaving school in 2023/23, highlighting the
successes and challenges, along with plans for the future to improve the outcomes
of our young people. 
Council is recommended to note the data for school leavers (2022/23) and agree
the proposed next steps to further improve outcomes for young people.
Page 24 of 126

Page 25

The Provost thanked the Executive Director Children, Young People and
Partnerships for the report and opened it up for questions and comments.
Councillor Scott in moving the report commented positively on the number of leavers
from Midlothian schools with an initial destination which was the third highest ever
recorded in Midlothian and expressed her thanks to everyone for the hard work
ensuring that Midlothian young people get off to a good start.
Councillors commented positively on the report and raised a question with regards
to the closure of the Esk Valley College, Edinburgh College. The Executive Director
Children, Young People and Partnerships confirmed that there have been no
discussions with regards to Edinburgh College and that the school/college
partnership has expanded.
There followed a brief discussion on Edinburgh College and the comment that it was
closing, and it was confirmed that there had been no formal discussion in any
meeting regarding this.
Thereafter Head Teachers commented on questions raised by Councillors with
regards to final destinations and Edinburgh College. The Head Teachers advised
that there are better links with Edinburgh College and that more courses are being
transferred to the Midlothian Campus which is positive, and Edinburgh College are
now working in the 6 Secondary Schools which allows all leavers to see a visible
link to College. They also advised on the attainment in Level 6 in literacy and
numeracy being lower and that this was a national issue and provided an
explanation on the work which was underway to improve the quality of passes at
Level 5 and to ensure the right students are studying the right courses to give them
the practical skills they require to achieve Level 6.  It was also noted that last year
Lasswade Level 6 was above the virtual comparative, and this is due to the school
being one of the pathfinder schools for the higher applications and that once the
right pathways are in place there should be an improvement in Level 6 passes.
Members raised that previously courses were removed from Edinburgh College and
the Midlothian students did not have access to all courses and it was expressed to
the Director of Children, Young People and Partnerships and Head Teachers to
continue to use this college as much as possible.
The Council Leader expressed their thanks to all the Head Techers and specialists
in attendance today as well as the staff and support staff that work across the school
estate who do an exceptional job which is displayed in this report and the importance
of pathways for all students.
The Provost took the opportunity to thank the Head Teachers for joining the meeting
today and wished them a peaceful and restful holiday period.
Decision
The Council approved the recommendations as stated in the report.
Action
Executive Director, Children, Young People and Partnerships 
Page 25 of 126

Page 26

Report No. Report Title Submitted by:
8.12 Single Midlothian Plan H2 Performance
Report (Half year October 2023 to
March 2024)
Chief Executive
Outline and Summary of Discussion 
The Chief Executive presented this report. The purpose of this report is to draw to
elected members attention to the Single Midlothian Plan 2023/27 and the H2
performance report of Midlothian Community Planning Partnership. It is a statutory
duty for the partnership to publish performance reports.
The Community Planning Partnership Board would like Council to note the excellent
partnership working which has produced the Single Midlothian Plan 2023/27,
enabling local communities to be well supported. In addition, the community
planning partnership would like you to note the H2 Performance Report (October
2023 to March 2024), which highlights progress on indicators and actions in H2.
The Chief Executive thanked members and partners for their hard work over the
course of the year.
The Provost thanked the Chief Executive for the report and opened it up for
questions and comments.
Decision
The Council noted the recommendations as stated in the report.
Action
Executive Director, Children, Young People and Partnerships 
Report No. Report Title Submitted by:
8.13 Midlothian Local Development Plan 2 –
Submission of Evidence Report to
Scottish Ministers for “Gate Check”
Chief Officer Place
Outline and Summary of Discussion 
The Chief Officer Place presented this report. This report asks Council to approve
the MLDP2 Evidence Report and associated documents (which includes the set
LHLR), MLDP2 Participation Report and MLDP2 Children and Young Person’s
Participation Report for submission to Scottish Ministers for Gate Check. 
The report provides details of a “Call for Ideas” to be undertaken during July-
October 2024 for MLDP2. Council is asked to note the “Call for Ideas” exercise. 
Council is recommended to: 
i. Endorse and approve the Midlothian Local Development Plan 2 (MLDP2)
Evidence Report and all the associated documents referred to in it, for
submission to Scottish Ministers for Gate Check – noting that the indicative
Local Housing Land Requirement (LHLR) agreed by Planning Committee at
its meeting of 4 June 2024 will be included in the Evidence Report submitted
for Gate Check;
Page 26 of 126

Page 27

ii. Endorse and approve for submission to Scottish Ministers for Gate Check the
MLDP2 Participation Report and MLDP2 Children and Young Person’s
Participation Report;
iii. Instruct the Planning, Sustainability and Investment Service Manager to
submit the approved MLDP2 Evidence Report and associated documents to
Scottish Ministers for Gate Check: and
iv. Note that a “Call for Ideas” for MLDP2 will be undertaken during July-October
2024. 
The Provost thanked the Chief Officer Place for the report and opened it up for
questions and comments.
The Council Leader thanked officers for the time taken in the members briefings
and thanked the Community Councils and Federation for their engagement. It was
also commented on that when Councillors make decisions some people do not like
the decision, but they do so for a variety of different reasons and highlighted that
Members acknowledge the increasing demand on Midlothian’s infrastructure. 
Councillor Parry moved the recommendations with the possibility of giving further
consideration to the smaller numbers of housing. 
Councillor Milligan advised they would second the motion if it was for the minimum
number of houses, this was agreed by Councillor Parry.
There followed a discussion with regards to the criteria and it was confirmed that
that as the sites come forward there is a criteria in place and if the criteria was not
met then the sites would not be considered. Members raised further queries
regarding the constrained and windfall sites and social housing sites and
infrastructure requirements and that this does not follow the growth of Midlothian.
Officers confirmed that the Federation of Community Council’s earlier deputation on
the agenda was in response to the Planning Committee report and that the Planning
Service had engaged with all Community Councils prior to the report being finalised. 
Councillor Parry moved the report for 8,850 houses plus 1, seconded by Councillor
Milligan.
Decision
To approve the recommendations set out in the report with the amendment to
approve only 8,850 houses plus 1.
Action
Chief Officer Place 
Report No. Report Title Submitted by:
8.14 Whitecraig Traveller Site Executive Director Place
Outline and Summary of Discussion 
The Executive Director Place presented the report.  The purpose of this report was
to evaluate Gypsy/Traveller accommodation options which meet need and demand
Page 27 of 126

Page 28

based on current guidance and stakeholder data. The report will include
recommendations on future housing provision(s) for Gypsy/Travellers in Midlothian. 
Council is recommended to: 
a. Authorise the Executive Director – Place, or nominee, to seek an early
termination of the Whitecraig Traveller Site lease with Buccleuch Property
Estate Office.
b. Midlothian Council to agree a formal unauthorised encampment process
between colleagues from housing, education, health, social work and Police
Scotland.
c. Midlothian Council to develop a code of conduct for those living on
unauthorised sites to be highlighted and implemented as part of initial site
visits. 
d. Commence discussions between Midlothian Council, University of Edinburgh
and Police Scotland to ensure future unauthorised sites are managed
following Scottish Government guidance.
e. Any future Gypsy/Traveller site requirement and search can be undertaken
through the development of the Local Development (LDP2) Proposed Plan
which will allow a decision to be taken on whether a site is needed through
LDP2 preparation. 
f. If demand exists, any future Gypsy/Traveller housing provision should have
five or more pitches for both short and longer term use.
g. If evidence suggests that a site is required, touring caravan facilities may be
considered. 
The Provost thanked the Executive Director Place for the report and opened it up
for questions and comments. 
Councillor Cassidy moved this report. 
Councillor Curran proposed an amendment to recommendation a) to add in ‘that will
be undertaken in conjunction with East Lothian Council and a full cost report to come
back to Council for final approval to include early termination cost and reinstatement
cost unless the cost is nil’. Councillor Cassidy confirmed he agreed with the
amendment to the recommendation a). 
Councillor Cassidy moved the report, seconded by Councillor Curran.
Decision
The recommendations were approved with an additional sentence added to
recommendation a) Authorise the Executive Director – Place, or nominee, to seek
an early termination of the Whitecraig Traveller Site lease with Buccleuch Property
Estate Office and that this will be undertaken in conjunction with East Lothian
Council and a full cost report to come back to Council for final approval to include
early termination cost and reinstatement cost unless the cost for this is nil.
Action
Executive Director Place
Page 28 of 126

Page 29

Report No. Report Title Submitted by:
8.15 Medium Term Financial Strategy Chief Financial
Officer/Section 95 Officer
Outline and Summary of Discussion 
The Chief Financial Officer/Section 95 Officer presented the report.  The report
sets out the outcome of a recent review of the Council’s financial planning
assumptions pointing to an increased budget gap of £9.406 million in 2025/26
rising to £20.645 million by 2028/29. 
Council is recommended to:
a) Note that the Business Transformation Steering Group (BTSG) will continue
to consider measures necessary to support delivery of a balanced Medium
Term Financial Strategy (MTFS) before any policy measures are presented
to Council.
b) Note that the financial outlook remains challenging for this term of Council
and note the recommendation of the external Auditor that, “as a matter of
urgency, officers and elected members need to work together to develop and
agree the medium-term financial strategy and progress the Council’s
transformation plans”.
c) Note the MTFS planning assumptions set out in the report (section 4.2).
d) Note the planned engagement on demographic pressures relating to
Additional Support Needs (ASN) and transitions to adult services (section
4.4).
e) Note that the budget gap for 2025/26, incorporating the planned use of
service concession retrospection and a 5% annual Council Tax increase is
projected to be £9.406 million, rising to a projected £20.645 million by
2028/29 (section 4.1).
f) Note the urgent need to finalise savings proposals, many of which will involve
extremely difficult choices, to achieve equilibrium between expenditure and
income (sections 5.6 and 5.7); and 
g) Otherwise note the remainder of the report.
The Provost thanked the Chief Financial Officer/Section 95 Officer for the report and
opened it up for questions and comments.
There followed a brief discussion on the financial severity and the budget gap and
clarification was asked with regards to the transition of children moving into
adulthood and the large figures regarding this. The Joint Director Health and Social
Care advised that with Children, Young People and Partnerships they have
established a transition group to look at how processes can be improved processes
advised on the increase on the adult social care budget and that the figures in the
paper were correct. 
Decision
To note the recommendations as detailed in the report.
Page 29 of 126

Page 30

Action
Chief Financial Officer/Section 95 Officer 
The Public section of the meeting concluded at 14.58 pm. 
9. Private 
Exclusion of Members of the Public 
In view of the nature of the business to be transacted, the Committee agreed
that the public be excluded from the meeting during discussion of the
undernoted item, as contained in the Addendum hereto, as there might be
disclosed exempt information as defined in paragraphs 3, 6 and 14 of Part I of
Schedule 7A to the Local Government (Scotland) Act 1973:- 
9.1  Mavisbank House – Update on proposed restoration by Landmark Trust,
report by Executive Director Place 
9.2 Transport Transformation Update, Executive Director, Children, Young People
and Partnerships 
9.3 Appointment of Chief Officer Children’s Services, Partnerships and
Communities 
Date of Next Meeting 
The next meeting will be held on Tuesday 27 August 2024 at 11.00am 
The meeting concluded at 15.45 pm. 
Page 30 of 126

Page 31

Midlothian Council Action Log 
No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments
1 21/02/2023 Capital Plan
Prioritisation
Refer approved Council report to
BTSG on additional affordability
scope and projects.
Executive
Director Place
October 2024 UPDATE: June 2024 –
Executive Director
provided an update and
as soon as ongoing work
was concluded would be
presented to August or
October Council
2 19/12/2023 8.4 Non-Domestic Rates
Relief Policy
Review of policy to be undertaken in
6 months – 1 year.
Chief Officer
Corporate
Solutions
No later than
April 2025
Report to council to be
submitted
3 19/12/2023 8.8 Fleet and Plant
Asset Replacement Plan
Considerations around increasing
fleet capacity to be brought to BTSG.
Chief Officer
Place
Report to BTSG
in September
and to Council in
October 2024
Fleet Management Plan
will follow Climate Action
Plan as proposing all
Refuse Collection
Vehicles and Heavy
Goods Vehicles remain
diesel. September BTSG
for Fleet Management
Plan.
Midlothian Council
Tuesday 27 August 2024
Item No 5.3
Page 31 of 126

Page 32

No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments
4 26/03/2024 8.3 Midlothian Council
Housing Allocation
Policy Review 2023/24
1. provide further information in
relation to the viability of the
Housing Revenue Account (HRA)
in the long term
2. consider providing physical
assistance for moving as an
incentive for tenants to downsize
3. consider increasing the financial
incentive for downsizing
4. audit of tenancy allocations
5. arrange an Elected Member
briefing on tenancy agreements
6. review benefit in kind. 
Executive
Director Place
August Council
updated 
No.1. Report to Council in
August 2024
No. 2/3/6
The budget in the HRA for
financial incentive for
downsizing is £65k, last
year we spent £33k against
this budget, this financial
year it appears spend will
be higher at around the
£55k as value was already
increased and extended to
mutual exchanges. Action
included in the review
process for the rent
strategy to also pick up the
physical assistance
element.
No.4. Assurance
Exercise in progress
however there has
been some delay as a
result of new systems
implementation so not
all relevant data is
readily accessible.
No.5. A Briefing
scheduled on Tenancy
Page 32 of 126

Page 33

No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments
Agreements and Anti-
Social Behaviour.
5 26/03/2024 8.4 Midlothian Council
Mixed Tenure Strategy
Arrange an Elected Member briefing
on arms length organisations
(ALEOs)
Executive
Director Place
Briefing date to
be scheduled
post Summer
recess.
Currently scoping option
for special purpose
vehicle in development
and management &
maintenance of Mid
Market Rent
6 07/05/2024 8.10 Glyphosate  Paper on neighbourhood service
operatives would be undertaking a
targeted winter programme of work in
springtime 2025.
Chief Officer
Place
Springtime 2025 Report to council to be
submitted
7 25/06/2024 7.1 School Uniforms Executive Director Children, Young
People and Partnerships to notify
schools to ensure this position is
adopted for the school term following
summer recess.
Executive
Director Children,
Young People
and Partnerships
Summer 2024 Recommend for
closure – non
embroidered uniforms
adopted for August 2024
term onwards. 
A school uniform policy
will be presented to
November council.
8 25/06/2024 7.2 Midlothian Indoor
Bowling Club Motion
Council will write to the team to
congratulate them on their incredible
success.
Chief Executive/
Leader of Council 
Complete – letter issued 
Page 33 of 126

Page 34

No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments
9 25/06/2024 8.14 Whitecraig
Traveller Site
A full cost report to come back to
Council for final approval to include
early termination cost and
reinstatement cost unless the cost for
this is nil.
Executive
Director Place
When termination
costs are known
Align to action jointly with
ELC 
Page 34 of 126

Page 35

Midlothian Council Meeting
Tuesday 27 August 2024
Reports for Noting Motion 
That Midlothian Council explores alternative mechanism for the
presenting and approval of “Reports for Noting” out with Council or
Committee meetings unless otherwise required by statute. 
Proposed by: Cllr Virgo
Seconded by: Cllr Smaill 
Page 35 of 126

Page 36

Page 36 of 126

Page 37

Midlothian Council 
Tuesday 27 August 2024
Item No 8.1 
Financial Monitoring 2024/25 – General Fund Revenue 
Report by David Gladwin, Chief Financial Officer and Section 95 Officer 
Report for Decision 
1 Recommendations 
Council is recommended to: 
a) Approve a supplementary estimate of £0.330 million to provide an
additional 0.2% budget to fund pay costs; and otherwise
b) Note the contents of this report. 
2 Purpose of Report / Executive Summary
2.1 The purpose of this report is to provide Council with information on
projections of performance against service revenue budgets in 2024/25
and to provide commentary on areas of material variance against
budget. The budget performance figures as shown in appendix 1 result
in a projected net overspend of £1.773 million which represents 0.6%
of the revised budget.  
2.2 Some areas of projected overspend relate to recurring areas of
financial pressure or slower than planned delivery of savings
measures. The Corporate Management Team have discussed these in
depth and, where possible, put in place recovery actions. 
2.3 The projection of the General Fund balance at 31st March 2025 is
£21.966 million, of which £14.783 million is earmarked for specific use
leaving a non-earmarked General Fund balance of £7.183 million. 
Date:  13 August 2024
Report Contact: David Gladwin, Chief Financial Officer and Section 95
Officer
David.Gladwin@midlothian.gov.uk   0131 271 3113 
Page 37 of 126

Page 38

2 
3 Background 
3.1 This report encompasses all performance against revenue budget for
General Fund services.
3.2 In response to the immediate and challenging financial outlook the
Chief Executive, during the financial year 2022/23, introduced a
moratorium on non-essential spend and a freeze on non-essential
vacancies. This moratorium remains in place and delivered some
staffing related and more general areas of underspend during the last
financial year.
Performance against budget
3.3 The material areas of projected variance against budget at quarter 1
are outlined in table 1 below which also describes mitigating measures
and next steps. Accurate projections early in a financial year are
difficult in many areas and come with a degree of uncertainty. 
Table 1: Material cost variances against budget   
Budget  Overspend  Reason
Action Plan /
Mitigating
Measures  Next Steps
Staff Costs £1,021,000 Maternity cover in
schools (£673,000),
absence cover costs for
cleaning and janitorial
services (£229,000),
additional resource in
Building Maintenance
Services (£250,000) and
higher costs from
temporary resources to
cover service areas with
permanent recruitment
challenges (£150,000). 
Partially offset by
vacancies across the
Council. 
Strategic Workforce
Plan is being
developed. 
Continuation of
enhanced level of
vacancy control. 
Continual review
of service costs. 
Review of
interaction
between the
General Fund and
the Housing
Revenue Account
for Building
Maintenance.
Insurance £693,000 The volume of insurance
claims settled,
particularly relating to
potholes has increased
considerably during
quarter 1.
Internal processes to
consider each claim
are being reviewed
with potential to
increase repudiation
rates and
consequently reduce
projected costs in
2024/25. 
Officer review
meeting linking in
with professional
insurer advice.
Pupil Transport £657,000 Volume and value of
school pupil transport
invoices higher than
budgeted.
Council approval to
proceed with the
transport review was
granted on 25th June
2024. 
This will include a
root and branch
review of practices,
processes and costs.
Appointment of
delivery partner. 
Where possible,
early
implementation of
identified
efficiencies.
Page 38 of 126

Page 39

3 
Council Tax
Income
£325,000 Whilst the Council Tax
Base continues to grow
total projected income is
lower than budgeted.
Slower than anticipated
growth, timing of
processing changes in
household
circumstances and
increased pressure on
household budgets will
all be factors. 
A detailed review is
underway to develop
a fuller
understanding of
influencing factors. 
Recent softening of
interest rates will
stimulate the new
house build market. 
Fleet £307,000 Ageing vehicles and
higher volumes of
external contracting than
planned. 
External vehicle hire to
support service
continuity.
Areas of service
have been re-
provisioned. 
Cost containment
measures in place. 
Fleet Maintenance
Review underway. 
Multi-year Fleet
Asset Management
Plan being
developed.
Fleet replacement
for ageing and
costly
maintenance has
been accelerated
as approved by
Council on
Tuesday 21st
November. 
Items are now
operational.
Building
Repairs
£139,000 Costs in 2024/25 relating
to scaffolding for
Midlothian House.
A report with
recommendations on
the future use of
Midlothian House is
scheduled for
Council
consideration in
October. 
Options for
changing the use
of Midlothian
House are linked
to the Estate
Rationalisation
strand of the
Transformation
Blueprint. 
Table 2: Shortfalls against income targets in the Budget 
Budget  Overspend  Reason
Action Plan /
Mitigating
Measures  Next Steps
Cafes £32,000 Income is lower than
budgeted targets.
New menus have
been introduced as a
trial and will be fully
implemented if
successful. It is
anticipated this
development will
move income
received to targeted
levels. 
Trial underway
and outcomes to
be evaluated later
in 2024/25. 
Page 39 of 126

Page 40

4 
There also remains £1.483 million of Medium Term Financial Strategy
(MTFS) cost reductions either to be finalised or to be fully implemented.
A number of these are taking longer than planned to implement with an
impact on the 24/25 financial position. A detailed report on this will be
presented to the Business Transformation Steering Group (BTSG) on
Monday 19th August. 
Council on 4th October 2022 agreed a saving of £0.250 million for
rationalisation of the office estate. Delivery of this remains at risk.
Underspends
• Loan Charges are projected to underspend by £1.648 million in
2024/25. There are three main factors:
o Deferral of borrowing to later years to match timing of
capital expenditure;
o A reduction of £22.2 million in the borrowing requirement
for 2024/25;  
o Higher than forecast surplus cash related directly to
timing of capital expenditure thus providing opportunity to
generate some deposit income.
• With the exception of Additional School Needs (ASN), costs
across the spectrum of learning settings for children and young
people are lower than provided for in the budget mainly due to
lower than expected pupil numbers thus giving rise to a positive
variance of £0.974 million. As projections are in advance of the
new school year they carry a heightened risk; 
• The cost of residential and day education placements for
children and also for some non-residential services is projected
to be £0.248 million less than budget.
3.4 The Corporate Management Team met on Wednesday 7th August to
consider the financial position agreeing, alongside the continued
financial discipline measures referenced in section 3.2, a range of
recovery actions and some areas of enhanced monitoring. 
Pay and funding 
3.5 Employees whose pay negotiations are covered by the Scottish Joint
Council (SJC) trade unions have not yet agreed a pay award for
2024/25 and the agreed award for those covered by the Scottish
Negotiation Committee for Teachers (SNCT) ended on 31st July 2024.
The latest employer offer to SJC unions equates to a total uplift of
4.27% in-year with, at each Spinal Column Point (SCP), a £0.67 uplift
to the hourly rate or 3.6% (whichever is better). This offer is currently
being considered by unions. A revised offer has not yet been made to
SNCT. 
Page 40 of 126

Page 41

5 
3.6 Funding for the 2024/25 offer as it stands involves an assumption of
3% in council budgets, another 0.2% funded from Council Reserves
and the remaining costs provided by the Scottish Government with
mechanisms to deliver this to be finalised. Midlothian Council budgeted
at 3% for pay in 2024/25. The additional 0.2% equates to costs of
approximately £0.330 million and this is recommended to be added to
the approved budget by way of a supplementary estimate. 
Destination Hillend 
3.7 The wider Destination Hillend project approved by Council in December
2022 has been paused pending a review of tendered costs with an
updated business case to be developed prior to further elected member
engagement. 
3.8 The first phase of the project included work on the road infrastructure
and installation of an alpine coaster. This phase is almost complete and
the coaster is due to open in the coming weeks. Whilst the 24/25
budget was set based on an opening date in July and reflected
customer income projections embedded in the approved business case
there was an expectation of a high initial level of interest on opening.
Rather than re-engineer projected numbers to derive a variance at
quarter 1 it feels more appropriate to wait for actual customer numbers
on opening and to use these to inform a more accurate projection for
2024/25 at quarter 2. 
4 Delegation of resources to Midlothian Integration Joint Board
4.1 The approved budget provided for the allocation of £63.535 million to
the Midlothian Integration Joint Board (MIJB) for the provision of
delegated services. 
4.2 In accordance with the Integration Scheme the MIJB is required to
deliver delegated services within the budget allocations from the
Council and NHS Lothian and where any overspend is projected to put
in place a recovery plan to address that. As a last resort the integration
scheme allows for the MIJB to seek additional financial support from its
partners, either by way of an additional budget allocation or by
“brokerage” (provision of additional resources in a year which are
repaid in the following year).  
4.3 Financial Monitoring reports covering all of the MIJB activities are
presented to the Integration Joint Board and are available on the
committee management section of the Council website:- 
Midlothian Integration Joint Board (cmis.uk.com)
4.4 MIJB next meet on Thursday 22nd August and will discuss projections
for 2024/25 which show a very significant overspend albeit with
mitigating actions underway. At this stage there is a heightened risk of
MIJB requiring additional resource from Midlothian Council to be able
to fund costs in 2024/25. Further information will be provided to Elected
Members in a briefing scheduled for Tuesday 3rd September and in
future financial monitoring reports. 
Page 41 of 126

Page 42

6 
5 General Fund Reserve 
5.1 The projected balance on the General Fund as at 31 March 2025 is as
follows: 
£ million £ million
General Fund Reserve at 1 April 2024  46.338   
Planned movements in reserves  
Application of Budgets carried forward from
2023/24 for use in 2024/25  (15.366) 
Utilisation of reserve to balance 2024/25 budget (2.680) 
Utilisation of retrospective service concessions to
fund costs in 2024/25  (4.093) 
Transformation funding applied to date during
2024/25  (0.130) 
Funding for pay (0.2%) – supplementary estimate (0.330) 
(22.599)
Overspend per appendix 1  (1.773)
General Fund Balance at 31 March 2025  21.966 
An element of the General Fund is earmarked for specific purposes
and this is shown below: 
£ million
General Fund Balance at 31 March 2025 21.966
Earmarked for specific purposes 
To support Council Transformation Blueprint (2.506)
Planned use of Service Concession Retrospection (12.277)
General Reserve at 31 March 2025 7.183 
5.2 The Reserves Strategy approved by Council on 12th February 2019
requires Council to maintain an adequate level of General Reserve to
provide a contingency for unforeseen or unplanned costs. In the
financial context at that time Council approved the adoption of 2% of
the approved budgeted net expenditure (excluding resources
delegated to the IJB) to be considered a minimum. This now equates to
£4.743 million. Council also agreed that where projections indicate that
should the 2% minimum General Reserve balance be breached an
immediate recovery plan be implemented to recover the position, failing
which, the next available budget would need to provide for the
reinstatement of reserve position. 
5.3 The General Reserve of £7.183 million is £2.440 million above the
minimum set in the Reserves Strategy. Considering current financial
pressures, the General Reserve must be viewed both in the context of
£3.096 million of underlying service pressures in 2024/25 (Appendix 1 -
General Fund Services Net Expenditure), the latest Medium Term
Financial Strategy (MTFS) projected gap of approximately £20.6 million
through to 2028/29 and also the severe in-year pressure faced by
MIJB. Until there is significant progress towards a balanced MTFS it
remains sound financial practice to maintain a substantial buffer in the
Page 42 of 126

Page 43

7 
General Reserve to offset any further adverse performance against
budget or delays in delivering savings measures.   
6 Report Implications (Resource, Digital and Risk) 
6.1 Resource 
The projected performance against budget set out in this report
presents the initial projections for the year. Work continues across the
council to reduce overspends and to progress at pace delivery of
approved savings. 
Council is asked to provide additional funding of £0.330 million for pay
costs in 2024/25 to increase total funding to 3.2%. 
6.2 Digital 
Increased reliance and investment in digital solutions and digital first
solutions will be a key element of future plans. 
6.3 Risk 
The 2024/25 Budget was finalised with some assumptions on Scottish
Government Grant Funding. The Scottish Government removed £145
million of funding for teachers from General Revenue Grant to Ring-
Fenced Revenue Grant (£2.786 million for Midlothian) with a wish to
attach conditions around teacher numbers to this funding. Discussions
have not been concluded and grant offer letters remain unsigned.
Whilst this situation persists there remains a risk of not receiving all the
expected funding. 
Further Scottish Government funding, via UK Government
consequentials, is due to pass to Councils to fund the Employers
Superannuation increase for Teachers. Funding for this has not yet
been received and Councils have not been advised of timescales. The
additional cost to Midlothian Council is approximately £1.8 million. 
Section 95 of the Local Government (Scotland) Act 1973 requires all
Local Authorities in Scotland to have adequate systems and controls
in place to ensure the proper administration of their financial affairs. 
The assessment of performance against budgets by services is
underpinned by comprehensive financial management and budgetary
control arrangements. These arrangements are central to the
mitigation of financial risk. 
Ensuring that adequate systems and controls are in place reduces the
risk of significant variances arising, and where they do arise they help
to ensure that they are identified and reported on and that appropriate
and robust remedial action is taken. The primary purpose of this report
is to provide an assessment of performance against budget for the full
year. The material variances detailed in the report highlight that the
Page 43 of 126

Page 44

8 
financial management and budgetary control arrangements require
continual review and enhancement if financial risk is to be effectively
mitigated during the year. 
There are some areas where effective forecasting of spend against
budget is hindered due to incomplete service information which in
previous years has resulted in previously unreported or significantly
adjusted variances at the financial year end. Financial Management
CMT continues to consider these areas and supports actions to
address the underlying issues and mitigate the risk associated with
them. At quarter 1 there is insufficient quality data to make meaningful
projections for energy costs and building maintenance recharges are
under review. Activity is in place to ensure this will be rectified for
quarter 2. 
The financial projections are predicated on new burdens, including
those arising from the Government’s 100 day commitments to be fully
funded. The position with outstanding pay awards and the potential for
unfunded costs arising presents a significant and ongoing risk to the
Council’s financial position. 
The Council recognises the potential for compensation claims deriving
from Scottish Government’s Limitation (Childhood Abuse) (Scotland)
Act 2017 which removes the three year time limit on claims of child
abuse. Some claims will be historic and relate to Lothian Regional
Council, Midlothian District Council or their predecessors and some
will date post reorganisation and relate to Midlothian Council, and so
presents a risk that would further reduce reserves from those currently
projected.  Further financial obligations may also arise as the
implications associate with the The United Nations Convention on the
Rights of the Child (Incorporation) (Scotland) Bill, which has yet to
secure Royal Assent, are more fully understood. 
6.4 Ensuring Equalities 
As changes to existing plans are developed the assessment of the
impact of these proposals in relation to their impact on equalities and
human rights will be carried out. This will help to ensure wherever
possible that there are no negative impacts on equality groups or
potential for infringement of individuals’ human rights from the any of
the proposals. 
6.5 Additional Report Implications 
See Appendix A 
Appendices 
Page 44 of 126

Page 45

9 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
The existing financial plans support the delivery of the key priorities in
the Single Midlothian Plan. As the impact on the Council of the
pandemic and recovery continues to unfold over the financial year any
changes in the availability and allocation of resources will need to be
considered in parallel to the actions proposed to continue to delivery
key priorities. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value. 
A.5 Involving Communities and Other Stakeholders 
The development of the Medium Term Financial Strategy reflects
community consultation exercises carried out in 2019 and again in
2022 to help shape the drafting of the “Midlothian Promise” and the
development of the Council’s Longer Term Financial Strategy.   
In addition, there is continued engagement with the recognised Trade
Unions on the financial position. 
Page 45 of 126

Page 46

10 
A.6 Impact on Performance and Outcomes 
The Financial Strategy facilitates decisions on how Council allocates
and uses its available resources and as such has fundamental
implications for service performance and outcomes. The lasting
financial consequences of the pandemic will impact on the availability
and allocation of resources in pursuit of key outcomes as set out in
the Single Midlothian Plan for both the immediate and longer term and
therefore the ability of the Council to continue to deliver services in a
financial sustainable manner. 
A.7 Adopting a Preventative Approach 
Maintaining the effectiveness of the Financial Strategy will support the
prioritisation of resources to support prevention. 
A.8 Supporting Sustainable Development 
There are no direct sustainability issues arising from this report and we
will work to mitigate as far as feasible any sustainability issues which
arise as a consequence of any of the changes to existing plans. 
Page 46 of 126

Page 47

Appendix 1 financial tables – Midlothian Council General Fund 2024/25 – Performance against budget 
Revised
Budget
Revised
Budget
Revised
Budget  (Underspend) 
Function
Approved
Budget  Expenditure Income Net Outturn / Overspend      
£ £ £ 
Management and Members 1,701,791  1,701,819 0 1,701,819 1,782,819 81,000 
Place       
Corporate Solutions 25,455,179  49,103,422 (24,665,446) 24,437,976 25,276,976 839,000 
Place 43,290,284  66,091,037 (17,282,056) 48,808,981 50,238,981 1,430,000 
Central Costs (504,556)  4,270,341 0 4,270,341 4,963,341 693,000 
People and Partnerships       
Midlothian Integration Joint Board 63,534,354  72,156,673 (8,621,856) 63,534,817 63,534,817 0 
Non-Delegated Services - Community Safety and
Welfare Rights 710,635  861,208 (53,102) 808,106 808,106 0 
Childrens Services, Partnerships and Communities 20,171,442  22,669,838 (765,932) 21,903,906 21,578,906 (325,000) 
Education 144,975,521  158,434,635 (9,256,856) 149,177,779 149,580,779 403,000         
Lothian Valuation Joint Board 581,659  581,659 0 581,659 581,659 0 
Non Distributable Costs 898,936  898,936 0 898,936 873,936 (25,000) 
GENERAL FUND SERVICES NET EXPENDITURE 300,815,246   376,769,568 (60,645,248) 316,124,320 319,220,320 3,096,000 
Loan Charges 5,460,091  5,460,091 0 5,460,091 3,812,091 (1,648,000) 
NDR Discretionary Relief 70,300  70,300 0 70,300 70,300 0 
Investment Income (110,736)  0 (110,736) (110,736) (110,736) 0 
Allocations to HRA, Capital Account etc. (5,536,901)  (5,536,901) 0 (5,536,901) (5,536,901) 0  
300,698,000   376,763,058 (60,755,984) 316,007,074 317,455,074 1,448,000
Page 47 of 126

Page 48

12 
less Funding:         
Scottish Government Grant (226,443,000)  0 (226,331,937) 226,331,937 226,331,937 0 
Council Tax (64,686,000)  0 (64,686,000) 64,686,000 64,361,000 325,000 
Service Concessions - in-year (2,796,000)  2,796,000 0 2,796,000 2,796,000 0 
Service Concessions - retrospection (4,093,000)  4,093,000 0 4,093,000 4,093,000 0 
Utilisation of Reserves 2,680,000   383,652,058 (351,773,921) 18,100,137 26,762,137 1,773,000 
Page 48 of 126

Page 49

Midlothian Council
Tuesday 27 August 2024
Item No 8.2   
Housing Revenue Account
Revenue Budget and Capital Plan 2024/25 
Report by David Gladwin, Chief Financial Officer and Section 95 Officer 
Report for Information 
1 Recommendations 
Council is recommended to note the contents of this report.   
2 Purpose of Report / Executive Summary 
The purpose of this report is to provide Council with a summary of
expenditure and income to 6th July 2024  for the Capital Plan and a
projected outturn for both the Housing Revenue Account (HRA) and
Capital Plan for 2024/25.    
The summarised financial performance for 2024/25 is:
• Capital Investment in the year totalling £65.707 million; 
• A net overspend of £0.417 million on the Revenue Account;
• A projected HRA general reserve at 31st March 2024 of £35.058
million. 
Date 05th August 2024 
Report Contact: 
Name Lisa Young Tel No 0131-271-3111
lisa.young@midlothian.gov.uk 
Page 49 of 126

Page 50

2 
3 Background 
3.1 Capital Plan 2024/25 
The Capital Plan Budget has been revised to reflect the current profile
of spend as shown in Appendix B.  Capital investment in the year is
projected to be £65.707 million. The council has been awarded £0.825
million grant funding from Scottish Government for contribution
towards net- zero emissions in the Council’s housing stock. This grant
will subsequently reduce the overall borrowing requirement for
2024/25. There are currently no other material variances to be
reported. 
At present there is no budget available within the 2024/25 Scottish
Government’s Affordable Housing Supply Programme to subsidise the
open market purchases in 2024/25. However, the Scottish
Government have announced a possible fund of £40 million which can
be used to subsidise open market purchases and this may result in
receipt of some funding during 2024/25. 
The Housing Revenue can sustain a small number of purchases
(approximately 6 units) during 2024/25 should no funding be received
or can access future year open market purchase budgets in the HRA
should a good value opportunity arise. 
3.2 Revenue Account 2024/25 
For 2024/25 there is currently a projected overspend of £0.417 million
against budget, as shown in Appendix C, this is due to:- 
• Ongoing complex works required to bring properties to
appropriate condition as well as continuous improvement in
void turnaround times resulting in an overspend in general
repairs of £0.513 million;
• Supervision and management costs is expected to be roughly
in line with 2023/24 outturn resulting in a projected overspend
of £0.150 million;
• Insurance premiums have increased by £0.121 million. 
This is offset by:- 
• Reflection of the latest delivery programme for the HRA capital
plan will result in lower borrowing costs of £0.330 million. 
The HRA general reserve balance is projected to be £35.058 million at
31st March 2025, which is committed to finance existing investment
commitments to 2039/40. 
Page 50 of 126

Page 51

3 
4 Report Implications 
4.1 Resource
There are no direct resource implications arising from this report. 
4.2 Digital
There are no direct digital implications arising from this report. 
4.3 Risk
The principal risks are around the issue of affordability, ensuring that
the investment in new build and the existing stock can be made
without having to impose unacceptable increases on weekly rents.
This is mitigated by the adoption of a long term financial strategy and
modelling which demonstrates that existing investment commitments
are sustainable.
There is also the risk of capital spend being lower than projected due
to delays on projects, particularly in the current climate , this could
result in lower debt charges causing the Housing Revenue Account
Reserve balance to increase by more than projected. 
4.4 Ensuring Equalities
There are no equality issues arising directly from this report. 
4.5 Additional Resource Implications
See Appendix A. 
Appendices
Appendix A – Additional Resource Implications
Appendix B - Capital Plan 2024/25
Appendix C – Revenue Account 2024/25 
Page 51 of 126

Page 52

4 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value. 
A.5 Involving Communities and Other Stakeholders 
The report does not directly relate to involving communities. 
A.6 Impact on Performance and Outcomes 
The report does not directly impact on Midlothian Council’s
performance and outcomes. 
A.7 Adopting a Preventative Approach 
The report does not directly relate to adopting a preventative approach. 
A.8 Supporting Sustainable Development 
The report does not directly relate to supporting sustainable
development.
Page 52 of 126

Page 53

5 
MIDLOTHIAN COUNCIL    Appendix B     
HOUSING REVENUE ACCOUNT
CAPITAL PLAN 2024/25         
Revised
Budget 
Actuals to
Date
Projected
Outturn
Variation
(Under)/Over 
£'000 £'000 £'000 £'000
FUNDING    
Grants    
- Incentivising New Build 7,287 2,624 7,287 0
- Off Market Purchases Funding 715 0 715 0
- Social Housing Net-zero Funding 0 0 825 825
Council Tax on Second Homes 90 0 90 0
Borrowing Requirement  57,615 2,545 56,790 (825)
TOTAL AVAILABLE FUNDING 65,707 5,169 65,707 0     
APPROVED EXPENDITURE £'000 £'000 £'000 £'000
New Build Houses Phase 2 - Phase 5 45,564 3,694 45,564 0
Dalkeith Town Centre Regeneration -
Social Housing 500 0 500 0
Backdated Developer Contribution 724 0 724 0
Off Market Purchases 1,950 0 1,950 0
Aids & Adaptations 519 53 519 0
Environmental Improvements 500 0 500 0
BDHS Meters 1,300 0 1,300 0
Homelessness - Temporary
Accommodation Provision 30 0 30 0
Scottish Housing Quality Standard    
-Upgrade Central Heating Systems 1,677 0 1,677 0
-Energy Efficiency Standard for Social
Housing (EESSH) 6,778 0 6,778 0
-SHQS Repairs 6,165 1,422 6,165 0
TOTAL EXPENDITURE  65,707 5,169 65,707 0 
Page 53 of 126

Page 54

6 
MIDLOTHIAN COUNCIL   Appendix C    
HOUSING REVENUE ACCOUNT
2024/25   
Revised
Budget
Projected
Outturn
Variation
(Under)/Over    
Average Number of Houses 7,664 7,613 (51)     
£'000 £'000 £'000
Repairs and Maintenance   
General Repairs 8,237 8,750 513
Decant/Compensation 71 66 (5)
Grounds Maintenance 603 600 (3) 
8,911 9,416 505    
Administration and Management 5,537 5,687 150
Loan Charges 16,568 16,238 (330)
Other Expenses 2,856 2,954 98
TOTAL EXPENDITURE 33,872 34,295 423    
Rents   
Houses (35,299) (35,303) (4)
Garages (690) (690) 0
Others (176) (178) (2)
TOTAL RENTS (36,165) (36,171) (6)    
NET EXPENDITURE/(INCOME) (2,293) (1,876) 417        
Movement in HRA Reserve   
Opening HRA Reserve  (33,182) 
Enhancement during 2024/25 as
above  (1,876) 
Reserve earmarked to fund capital
investment plans  (35,058) 
Page 54 of 126

Page 55

Midlothian Council
Tuesday 27 August 2024
Item No 8.3   
General Services Capital Plan – 2024/25 Quarter 1 Monitoring 
Report by David Gladwin, Chief Financial Officer & Section 95 Officer 
Report for Decision 
1 Recommendations 
It is recommended that the Council: 
1. Note/approve the adjustments to the project expenditure budgets
in the GSCP as set out in Section 3.1;
2. Approve the inclusion of the project in Section 3.2 in the GSCP;
3. Note the forecast outturn for expenditure, funding and borrowing,
as outlined in Section 4. 
2. Purpose of Report 
The purpose of this report is to provide Council with: 
• An update of the GSCP incorporating information on further
additions to the Plan for approval and adjustments to existing
project budgets (Section 3);
• Information on the projected performance against budget for
2024/25 (Section 4);
• Update on the Capital Fund (Section 5). 
Date 7 August 2024
Report Contact:
Gary Thomson, Senior Finance Business Partner
gary.thomson@midlothian.gov.uk  
Page 55 of 126

Page 56

2 
3 Update of GSCP 
3.1 Adjustments to existing project budgets 
The following adjustments to existing project expenditure and income
budgets are included in the GSCP: 
• Loanhead Memorial Park Pitch: Capital expenditure budget
increased from £0.004 million to £0.066 million to install vertical
drainage using ECO90 technology in support of the Council’s pitch
needs assessment.  Capital expenditure budget to be fully phased
in 2024/25 and fully funded by already-collected community facility
developer contributions. Approved by Capital Plan & Asset
Management Board on 8 August 2024. 
3.2 Projects presented for endorsement in the Plan 
The following projects are presented for endorsement to be fully adopted
within the GSCP: 
• Active Travel Tier 1 Infrastructure Fund 2024/25: £0.655 million of
new active travel infrastructure across the county, full phased in
2024/25 and fully funded in full by £0.655 million of Scottish
Government Active Travel Infrastructure fund, replacing the
previous Cycling, Walking & Safer Routes (CWSR) fund.
• Road Safety Improvement Fund 2024/25: £0.169 million of new
infrastructure to reduce accident potential within Midlothian,
capital expenditure budget to be fully phased in 2024/25 and fully
funded by £0.169 million of Scottish Government Road Safety
Improvement Fund grant.  Approved by Capital Plan & Asset
Management Board on 8 August 2024. 
4 2024/25 Projection against budget 
4.1 2024/25 Budget 
After accounting for the following: 
• Rephasing of budgets from 2023/24 to 2024/25, and new projects
added to the plan, both as reported to Council on 25 June 2024;
• Including the new projects & adjustments to project budgets as
outlined in Section 3;
• Rephasing of budgets based on the latest information available
from project managers as noted in Table 1 below 
the capital plan expenditure budget for 2024/25 is £80.665 million. 
Page 56 of 126

Page 57

3 
Table 1: Rephasing of project expenditure budgets 
Project Description of amendment to
budget
Previous
2024/25
Budget
£000’s
Revised
2024/25
Budget
£000’s
2024/25
Budget
Movement
£000’s
CHILDREN, YOUNG PEOPLE & ESTATES PROGRAMME BOARD
Beeslack Community
High School
Replacement
Some programme slippage
associated with procurement
process, with project team aiming
to recover during remainder of
project programme
12,824 11,743 -1,081
Penicuik High School No requirement for enabling works
in 2024/25 linked to modular units
2,329 2,058 -271
Learning Estate Strategy:
Development Budget
Realignment of budget across
current life of capital plan
1,602 400 -1,202
ASSET MANAGEMENT PROGRAMME BOARD
TRANSPORT, ENERGY & INFRASTRUCTURE PROGRAMME BOARD
REGENERATION & DEVELOPMENT PROGRAMME BOARD
Destination Hillend
Re-design of building taking place
with deferral of any associated
expenditure until later years of
GSCP
12,707 4,975 -7,732
OTHER
Others Minor variances 7,521 7,543 +22
Total  36,983 26,719 -10,264 
In line with this, the expected level of funding available to finance the
plan has also been rephased and totals £30.188 million. 
This results in an in-year budgeted borrowing requirement of £50.477
million. 
The projected performance against budget for 2024/25 is shown in table
2 below:- 
Table 2: GSCP Projected Performance against Budget 2024/25 – as
at Quarter 1 
Item 2024/25  2024/25 Actual 2024/25 2024/25 2024/25
Initial Rephased To Projected Variance Carry
Budget*1 Budget 23.06.24 Outturn £000’s Forward
£000’s £000’s £000’s £000’s £000’s
Expenditure 90,929 80,665 10,047 77,208 -3,457 -10,264
Funding 32,375 30,188 4,944 26,737 -3,451 -2,187
Borrowing
Required
58,554 50,477 5,103 50,471 -6 
1 With new projects added
Page 57 of 126

Page 58

4 
4.2 Expenditure 
Expenditure to 23 June 2024 is £10.047 million with a projected
expenditure outturn of £77.208 million, £3.457 million less than the
rephased budget. 
At this stage it is anticipated that all budgets for the projects detailed in
Appendix 1 will be fully spent in the current year, other than:- 
• Burnbrae Primary School External Works: Minor underspend of
£0.001 million against project expenditure budget
• 2-4 West Street, Penicuik: Minor underspend of £0.006m with
reduction in application of developer contributions
• Shawfair Town Centre Land Purchase: Part of the land acquisition
(£3.451 million) was funded directly by a payment from SLLP to
Network Rail.  Subsequent underspend of £3.451 million in both
capital expenditure and funding budgets which offset each other. 
The expenditure to Quarter 1 (£10.047 million) equates to 13% of the
forecast outturn expenditure (£77.208 million).  This means that the
remaining £67.161 million, or 87% of expenditure, is projected to be
incurred by the end of the financial year, with only 77% of the financial
year remaining. 
The expenditure forecasts are based on the latest assessment of project
expenditure by service leads and project managers.  The risk in these
forecasts is that expenditure is materially less than forecast, with overly
optimistic forecasts from service leads and project managers resulting in
underspends within the current financial year and/or rephasing from
2024/25 back to 2025/26. 
The actual outturn position will be presented as part of the General
Services Capital Plan – Outturn 2024/25 report to Council in June 2025,
with prior reporting, challenge and assessment at Capital Plan & Asset
Management Board. 
4.3 Funding 
The funding available to finance the Capital Plan in 2024/25 is expected
to total £26.737 million, £3.451 million less than the rephased budget,
accounting for the direct receipt of grant from SLLP to Network Rail for
the Shawfair Town Centre Land Purchase.  Funding of £4.944 million
has been received to 23 June 2024. 
4.4 Borrowing 
The budgeted level of borrowing for 2024/25 is £50.477 million.  Based
on the forecast expenditure and funding levels as noted above, the
revised estimate of the level of borrowing required for 2024/25 is
forecast to be £50.471 million, £0.006 million less than budgeted and
reflecting the variance as noted in Section 4.2 above.  The impact on the
Page 58 of 126

Page 59

5 
Council’s borrowing costs is reflected in the Financial Monitoring
2024/25 General Fund Revenue report elsewhere on today’s agenda. 
5 Capital Fund 
The Capital Fund at the start of the 2024/25 financial year was £17.242
million.  £7.694 million of this is committed to fund the City Deal, with a
further £7.061 million committed to support capital investment. 
The forecast non-committed capital fund balance at 31 March 2025 is
£2.778 million, as shown in the table below. 
Item Amount
£000’s
Balance at 01 April 2024 17,242
Forecast Capital Receipts 2024/25 895
Forecast Balance at 31 March 2025 18,137
Committed to fund City Deal Project -7,694
Committed to support Capital Investment -7,061
Developer Contributions earmarked for specific purposes -604
Forecast non-committed balance at 31 March 2025 2,778  
Page 59 of 126

Page 60

6 
6. Report Implications 
6.1 Resource 
The borrowing required to finance the planned investment in 2024/25 is
reflected in the Financial Monitoring 2024/25 – General Fund Revenue
report elsewhere on today’s agenda. 
6.2 Digital 
There are no Digital Services implications arising from this report. 
6.3 Risk 
The construction materials supply chain has already been subject to
unprecedented disruption through a combination of the Coronavirus
(COVID-19) Pandemic, the UK leaving the European Union, the conflict
in Ukraine and the global inflationary picture, which is only now starting
to ease but the cumulative/compound effects of the inflationary
environment of the last few years remain locked into current
construction/material prices.  The Construction Leadership Council
(CLC) continues to report shortages of construction materials and
forecasts this disruption to continue for the foreseeable future.  Ongoing
engagement with suppliers confirms that materials shortages, longer
lead times and steep price increases are highly likely to continue to
impact the supply chain. 
This potentially exacerbates the inherent risk in the Capital Plan that
projects will cost more than estimated thus resulting in additional
borrowing or will be subject to significant delay. 
Strengthened financial monitoring & governance procedures have been
approved by CP&AMB, which will ensure that significant variations in
project expenditure and funding can be captured and reported to
Programme Boards and CP&AMB so that remedial action can be taken
to mitigate the risks. 
In developing the strategy and taking cognisance of the longer term
affordability gap it is clear that a number of potential projects which are
currently included will only be able to be progressed if they can be
delivered on a spend to save basis (i.e. where income or cost savings
more than offset the cost of funding the investment) or where they can
be delivered on a cost neutral basis or through alternative funding
mechanisms. 
The Capital Plan includes a provision for the return of contingencies of
£13.081 million over the period 2024/25 to 2027/28, equating to 2.5% of
all project expenditure.  This includes a provision for the return of
contingencies of £2.539 million in 2024/25.  The risk is that projects
throughout the plan are unable to deliver this which could be in part due
to factors outwith the Council’s control.  Capital Plan & Asset
Management Board will review the level of return of contingencies
Page 60 of 126

Page 61

7 
against the £13.081 million provision on an ongoing basis to ensure that
projects can, where possible, deliver against this provision and that the
provision continues to be appropriate. 
6.4 Ensuring Equalities 
There are no equalities issues arising directly from this report. 
6.5 Additional Report Implications 
See Appendix A. 
Page 61 of 126

Page 62

8 
Appendix A: Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable. 
A.2 Key Drivers for Change 
A.3 Key Delivery Streams 
Themes addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value. 
A.5 Involving Communities and Other Stakeholders 
No external consultation has taken place on this report. 
A.6 Impact on Performance and Outcome 
There are no issues arising directly from this report. 
A.7 Adopting a Preventative Approach 
Not applicable. 
A.8 Supporting Sustainable Development 
Not applicable. 
Background Papers:
Appendix 1 –GSCP 2024/25 – Quarter 1 Monitoring 
Page 62 of 126

Page 63

Appendix 1: GSCP 2024/25 – Quarter 1 Monitoring 
Budget is approved in principle - requires approval of OBC before budget is fully approved
Budget is a "Project Under Development" - requires approval of SOBC before budget is fully approved
Rephased
2024/25 2024/25 2024/25 2024/25 2024/25 2024/25 Note/
GENERAL SERVICES CAPITAL PLAN Budget Budget Actual Forecast Variance Carry Explanation
Q1 Monitoring Q1 to P3 Outturn Q1 Q1 Forward Q1 for
£'000 £000's £000's £000's £000's £000's Variance/Carry Forward
CHILDREN, YOUNG PEOPLE & ESTATES PROGRAMME BOARD
FULLY APPROVED PROJECTS
Education - Primary
Woodburn Primary 9 class & activity hall extension 7,329 7,372 1,031 7,372 - (43) Minor adjustment to project expenditure
profile
Easthouses Primary School 5,446 5,446 3,251 5,446 - -
Mayfield & St. Luke's School Campus 10,268 10,268 173 10,268 - -
Burnbrae Primary - Conversion of ASN to GP Space 55 55 - 55 - -
Modular Units 2023/24 344 344 77 344 - -
Education - Secondary
Lasswade High - Toilets & Changing to 1,800 Pupil Capacity 452 452 - 452 - -
Beeslack CHS Replacement 12,824 11,743 104 11,743 - 1,081
Some programme slippage associated with
procurement process, with project team
aiming to recover during remainder of
project programme
Penicuik High School 2,329 2,058 214 2,058 - 271 No requirement for enabling works in
2024/25 linked to modular units
Education - ASN
Hawthornden Primary - ASN Unit 24 24 13 24 - -
Education - Early Years
King's Park Primary School 6 6 - 6 - -
Settings/Catering Kitchens 382 382 0 382 - -
Mauricewood Primary School 125 125 - 125 - -
Vogrie Outdoor Early Learning Centre 81 81 - 81 - -
Education - Primary - Projects near completion
Paradykes Primary Replacement 69 69 3 69 - -
New Danderhall Primary hub 61 61 (62) 61 - -
Acoustic Upgrades 95 95 4 95 - -
Education _ General -
Learning Estate Strategy: Development Budget 1,602 400 - 400 - 1,202 Realignment of budget across current life of
capital plan
Burnbrae Primary School External Works 2 2 - 1 (1) - Project expenditure complete with minor
underspend against budget
TOTAL - CHILDREN, YOUNG PEOPLE & ESTATES PROGRAMME BOARD41,492 38,981 4,807 38,981 (1) 2,511
Rephased
2024/25 2024/25 2024/25 2024/25 2024/25 2024/25
GENERAL SERVICES CAPITAL PLAN Budget Budget Actual Forecast Variance Carry
Q1 Monitoring Q1 to P3 Outturn Q1 Q1 Forward Q1
£'000 £000's £000's £000's £000's £000's
PROJECTS APPROVED IN PRINCIPLE
Education - Primary
Bilston Primary School Extension - - 26 26 - -
Mauricewood Refurbishment 807 807 27 807 - -
Hopefield Farm Primary 2 (HS12) 500 500 - 500 - -
St Davids Primary - 4 class & EY extension 784 784 - 784 - -
Education - ASN
ASN Provision - Social Complex Needs 250 250 - 250 - -
TOTAL - CYPP APPROVED IN PRINCIPLE 2,341 2,341 53 2,341 - -
Rephased
2024/25 2024/25 2024/25 2024/25 2024/25 2024/25
GENERAL SERVICES CAPITAL PLAN Budget Budget Actual Forecast Variance Carry
Q1 Monitoring Q1 to P3 Outturn Q1 Q1 Forward Q1
£'000 £000's £000's £000's £000's £000's
PROJECTS UNDER DEVELOPMENT
Education - Primary
Bonnyrigg Catchment Primary Schools Expansion - - 1 - - -
Education - Secondary
Shawfair All-through Campus 1,652 1,652 - 1,652 - -
Identification of a site for a Gorebridge High School - - - - - -
TOTAL - CYPP PROJECT UNDER DEVELOPMENT 1,652 1,652 1 1,652 - -
CYPP - OVERALL TOTAL 45,485 42,974 4,862 42,974 (1) 2,511
Page 63 of 126

Page 64

10 
Rephased
2024/25 2024/25 2024/25 2024/25 2024/25 2024/25
GENERAL SERVICES CAPITAL PLAN Budget Budget Actual Forecast Variance Carry
Q1 Monitoring Q1 to P3 Outturn Q1 Q1 Forward Q1
£'000 £000's £000's £000's £000's £000's
ASSET MANAGEMENT PROGRAMME BOARD
Digital
Business Applications 235 235 23 235 - -
Front Office - Hardware, Software  & Services 160 160 - 160 - -
Back Office - Hardware, Software & Services 55 55 - 55 - -
Network, Software & Services 528 528 - 528 - -
Schools - Hardware, Software  & Services 356 356 20 356 - -
Recharge of Staffing 110 110 - 110 - -
Digital: Equipped for Learning 2,120 2,120 - 2,120 - -
Roads & Street Lighting
Street Lighting and Traffic Signal Upgrades - New 1,015 1,015 119 1,015 - -
Footway & Footpath Asset Management Plan - New 542 542 (89) 542 - -
Road Upgrades - Asset Management Plan 1,598 1,598 129 1,598 - -
Accelerated Roads Residential Streets 76 76 76 76 - -
Roads: Potholes & Upgrades / Residential Streets 4,687 4,687 245 4,687 - -
Roads Asset Management Plan - Temple Ground Stabilisation309 309 - 309 - -
Roads Asset Management Plan - B6372 Arniston Embankment Stabilisation593 593 - 593 - -
Fleet
Vehicle & Plant Replacement Programme 4,062 4,062 137 4,062 - -
Property
Property Upgrades 1,034 1,034 17 1,034 - -
Property Upgrades - LES 843 843 - 843 - -
Open Spaces / Play Areas
Outdoor Play Equipment - Rosewell 44 44 - 44 - -
Roslin Wheeled Sports Facility 59 59 - 59 - -
Mauricewood Road Bus Shelter 4 4 - 4 - -
Millerhill Park Asphalt Path 100 100 2 100 - -
Birkenside Play Equipment 72 72 - 72 - -
Welfare Park, Newtongrange 39 39 - 39 - -
Play Park Upgrades: Clarinda Gardens & Ironmills Park 51 51 - 51 - -
Play Park Renewal 2023/24+ 123 123 - 123 - -
Nature Restoration Fund 2023/24 43 22 - 22 - 21 Majority of works to be complete by
October 2024 - remainder by May 2025
Contaminated Land 70 70 12 70 - -
Sport & Lesiure
Loanhead Memorial Park Pitch 66 66 - 66 - -
Flotterstone Car Park Infrastructure & Charging 16 16 - 16 - -
TOTAL - ASSET MANAGEMENT PROGRAMME BOARD19,011 18,990 691 18,990 - 21
TRANSPORT, ENERGY & INFRASTRUCTURE PROGRAMME BOARD
Transport
A701 Relief Road: Bush Loan Junction 61 61 54 61 - -
A701 Relief Road: A701 Active Travel Corridor 36 36 - 36 - -
A7 Urbanisation 187 187 - 187 - -
Active Travel Infrastructure 655 655 10 655 - -
Community Bus Fund 4 4 - 4 - -
Road Safety Improvement Fund 169 169 - 169 - -
FCC Zero Waste - Heat Offtake Facility 1,040 1,040 - 1,040 - -
TOTAL - TRANSPORT, ENERGY & INFRASTRUCTURE PROGRAMME BOARD2,153 2,153 64 2,153 - -
REGENERATION & DEVELOPMENT PROGRAMME BOARD
Regeneration
Place Based Investment Fund 2021/22 298 298 - 298 - -
Place Based Investment Fund 2022/23 182 182 67 182 - -
Place Based Investment Fund 2023/24 149 149 31 149 - -
Development -
Destination Hillend 12,707 4,975 1,775 4,975 - 7,732
Re-design of building taking place with
deferral of any associated expenditure until
later years of GSCP
Shawfair Town Centre Land Purchase 5,573 5,573 2,122 2,122 (3,451) - SLLP funding transferred directly from SLLP
to Network Rail
TOTAL - REGENERATION & DEVELOPMENT PROGRAMME BOARD18,910 11,178 3,995 7,726 (3,451) 7,732
Page 64 of 126

Page 65

11 
Rephased
2024/25 2024/25 2024/25 2024/25 2024/25 2024/25
GENERAL SERVICES CAPITAL PLAN Budget Budget Actual Forecast Variance Carry
Q1 Monitoring Q1 to P3 Outturn Q1 Q1 Forward Q1
£'000 £000's £000's £000's £000's £000's
OTHER (PROGRAMME BOARD NOT YET DEFINED)
PLACE
Digital
Council Hybrid Meetings 22 22 - 22 - -
Property/Development -
Midlothian & Fairfield House Shower Upgrades 5 5 - 5 - -
32-38 Buccleuch Street Ground Floor Redevelopment - - 1 1 1 -
Public Sector Housing Grants 291 291 50 291 - -
Penicuik THI: Public Realm Scheme 171 171 - 171 - -
CCTV Network 146 146 - 146 - -
2-4 West Street, Penicuik 26 26 1 20 (6) - Projected minor underspend with reduction
in application of developer contributions
EWiM - Buccleuch House Ground Floor 33 33 - 33 - -
Millerhill Pavilion 7 7 - 7 - -
PEOPLE & PARTNERSHIPS -
Education -
Free School Meal Provision 210 210 - 210 - -
Communities & Partnerships -
Members Environmental Improvements 251 251 17 251 - -
Adult Social Care -
Assistive Technology 102 102 - 102 - -
Analogue to Digital Transition 851 851 - 851 - -
Highbank Intermediate Care Reprovisioning 5,082 5,082 352 5,082 - -
Day Care Centre 464 464 - 464 - -
General Fund Share of Extra Care Housing 248 248 13 248 - -
TOTAL NOT ALLOCATED TO PROGRAMME BOARDS 7,909 7,909 435 7,904 (5) -
SUBTOTAL - PRE RETURN OF CONTINGENCIES 93,468 83,204 10,047 79,747 (3,457) 10,264
Provision for Return of Contingencies (2,539) (2,539) - (2,539) - -
-
GENERAL SERVICES CAPITAL PLAN TOTAL 90,929 80,665 10,047 77,208 (3,457) 10,264
Page 65 of 126

Page 66

Page 66 of 126

Page 67

Midlothian Council
Tuesday 27 August 2024
Item No 8.4 
The Education (Scotland) Bill 
Report by Michelle Strong Education Chief Operating Officer 
Report for Information 
1 Recommendations 
Council is requested to: 
• note the Education (Scotland) Bill which will bring a new agency
Qualifications Scotland and His Majesty’s Chief Inspector for Education in
Scotland;
• note the response by officers to the Call for Views on the Education
(Scotland) Bill; including assurance that Qualification Scotland will be
based at Wester Shawfair, Danderhall, currently used by the Scottish
Qualification Authority (SQA) 
2 Purpose of Report/Executive Summary 
To inform elected members of the Scottish Government’s Education
(Scotland) Bill call for views which opened on 28th June 2024 and the
response developed by officers. 
07 August 2024 
Report Contact:
Michelle Strong, Education Chief Operating Officer
michelle.strong@midlothian.gov.uk 
Page 67 of 126

Page 68

2 
3 Background/Main Body of Report 
3.1 The Education (Scotland) Bill was introduced on 4 June 2024. The call for
views opened on 28 June 2024 and closes on 30 August 2024. 
The Bill was created to support the education and skills reform being taken
forward by the Scottish Government. The changes brought in by the Bill
respond to a range of reports and reviews, including the OECD Review of the
Curriculum for Excellence and Professor Ken Muir’s report, Putting learners at
the Centre: Towards a Future Vision for Scottish Education. 
The Bill is in two main parts: 
Part 1 of the Bill establishes Qualifications Scotland. Qualifications Scotland
will: 
• Replace the Scottish Qualifications Authority (SQA).
• Develop and award qualifications (other than university degrees).
• Have an independent Accreditation Committee to regulate qualifications
and the organisations that award them.
• Give advice to Scottish Ministers.
• Produce charters setting out what learners, teachers and practitioners
should expect from Qualifications Scotland.
• Involve learners, teachers and others in decision making through a Board
of Management, committees and an advisory council. 
Part 2 of the Bill establishes the Chief Inspector and sets out what they will do
and how they will operate.  The Chief Inspector will: 
• Inspect places where education is provided and education services.
• Have an Advisory Council.
• Publish an inspection plan and reports on inspections.
• Publish an annual report, and reports on the performance of the Scottish
education system.
• Tell Scottish Ministers when a school or education authority is not making
necessary improvements. 
The Bill also gives Scottish Ministers the powers to require that improvements
are made. 
Although the Bill establishes a new body called Qualification Scotland and a
new office His Majesty’s Chief Inspector of Education in Scotland, its
provisions largely replicate existing legislation. 
3.2 The Education (Scotland) Bill - Call for Views 
The Call for views focuses on the two parts of the Bill relating to establishing
Qualifications Scotland and new duties / powers of the Chief Inspector.
Unfortunately, the Call for views opened on 28 June 2024, the same day that
Midlothian schools closed for the summer holidays. Therefore the
engagement with those most affected by the proposed changes has not been
possible. The Call for Views has been circulated to schools, parents and
partner agencies for individuals to respond by 30 August. 
Page 68 of 126

Page 69

3 
Call for views - there are two options available: 
Detailed call for views:
• Several reports, including the OECD Review of the Curriculum for
excellence and Professor Ken Muir’s report Putting Learners at the
Centre:Towards a Future vision for Scottish Education, have
recommended reforming the current Scottish Qualifications Authority. How
well do you think the Bill addresses the concerns raised in those reports?
• The Bill sets out measures designed to better involve learners, teachers
and others in the new body’s decision-making. What do you think about
these measures?
• The Bill creates several charters, designed to let people know what they
can expect when interacting with Qualifications Scotland. What is your
view of these charters?
• Part 2 of the Bill establishes the role of HM Chief Inspector of Education in
Scotland, setting out what they will do and how they will operate. What are
your views of these proposals? E.g. do they allow for sufficient
independence?
• What are your views on the reporting requirements set out in the Bill,
including the requirement to report on the performance of the Scottish
education system?
• Are there any powers HM Chief Inspector should have that are not set out
in the Bill?
• Do you have any other comments on the Bill? 
Shorter call for views: 
• What are your views on the proposals for Qualification Scotland?
• What are your views on the proposal for a new HM Chief Inspector of
Education in Scotland? 
3.3 Midlothian officer response 
Question 1. Several reports, including the OECD Review of the Curriculum for
Excellence and Professor Ken Muir’s report Putting Learners at the Centre
Towards a Future vision for Scottish Education, have recommended
reforming the current Scottish Qualifications Authority. How well do you think
the Bill addresses the concerns raised in those reports? 
Response
Although the Bill details the functions and governance of the new agency,
these duties appear similar to the existing functions of the Scottish
Qualifications Agency (SQA). It is hoped that greater involvement and
engagement with stakeholders will lead to the reformation referenced in the
OECD review and Professor Ken Muir’s report. 
Question 2. The Bill sets out measures designed to better involve learners,
teachers and others in the new body’s decision-making. What do you think
about these measures? 
Response
Midlothian Council’s education service welcome the introduction of a teacher
and practitioner interest committee. It is pleasing that the majority of this
committee will be non- Qualifications Scotland members.
Page 69 of 126

Page 70

4 
Question 3. The Bill creates several charters, designed to let people know
what they can expect when interacting with Qualifications Scotland. What is
your view of these charters? 
Response
Midlothian Council’s education service support the introduction of learner and
teacher/practitioner charters. It is pleasing that through consultation key
stakeholders (learners and teachers) will inform the functions of Qualifications
Scotland and decisions made by the new agency. 
Question 4. Part 2 of the Bill establishes the role of HM Chief Inspector of
Education in Scotland, setting out what they will do and how they will operate.
What are your views of these proposals? E.g. do they allow for sufficient
independence? 
Response
Midlothian Council’s education service supports the establishment of The
Office of His Majesty’s Chief Inspector of Education in Scotland. The rationale
for a Depute Chief Inspector of Education in Scotland is unclear and comes at
a time of fiscal challenge for national and local government. 
The duties of the HM Chief Inspector of Education in Scotland are clearly
defined in the Education (Scotland) Bill however the inspection of Early years
settings and the interface with other bodies such as the Care Inspectorate is
unclear. There is also lack of clarity on what powers the Chief Inspector of
Education in Scotland will have with regard to the introduction of new
inspection activity and whether there will be a duty placed on this postholder
to involve key stakeholders from the outset in considering new themes,
services or bodies to be inspected. 
Question 5. What are your views on the reporting requirements set out in the
Bill, including the requirement to report on the performance of the Scottish
education system? 
Response
Midlothian Council’s education service believes that inspection carried out by
knowledgeable, experienced HMI supports improvement and provides
assurance on quality. Reporting inspection outcomes and the performance of
the Scottish education system provide assurance and accountability to
Ministers and to the public. 
A significant change detailed in the Bill relates to Enforcement action, this is a
new approach for the inspectorate and further clarity is required to better
understand expectations, timescales and responsibilities 
Question 6. Are there any powers HM Chief Inspector should have that are
not set out in the Bill? 
Response
As previously stated, not all aspects of education are covered and
consideration should be given to who has responsibility for the inspection of
early years and other day services for children. It makes sense to have one
inspection body, reporting on one Scottish education system. 
Question 7.Do you have any other comments on the Bill? 
Page 70 of 126

Page 71

5 
The Scottish Qualifications Authority (SQA) operates two sites in Scotland –
Dalkeith and Glasgow. The Bill (page 33) references the transfer of property
that was owned by SQA and the assumption is that Qualifications Scotland
will occupy the current SQA building at Wester Shawfair. However, Midlothian
Council seeks assurance that Qualification Scotland will operate at their
Wester Shawfair, Danderhall in the longer term. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
There are no direct resource implications from this report. 
4.2 Digital 
There are no direct digital implications arising from this report. 
4.3 Risk 
4.4 Ensuring Equalities 
There are no equality issues arising directly from this report. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Background information/Links 
Page 71 of 126

Page 72

6 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
N/A 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one
X None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
X None of the above 
A.4 Delivering Best Value 
This report does not directly impact on delivering Best Value 
A.5 Involving Communities and Other Stakeholders 
This report does not directly relate to involving communities. Schools and
Parent Councils have been informed of the Call for Views and encouraged to
respond directly. 
A.6 Impact on Performance and Outcomes 
This report does not directly impact on Midlothian Council’s performance and
outcomes. 
A.7 Adopting a Preventative Approach 
This report does not directly impact on adopting a preventative approach. 
A.8 Supporting Sustainable Development 
This report does not directly impact on supporting sustainable development. 
Page 72 of 126

Page 73

7 
APPENDIX B 
Background Papers/Resource Links (insert applicable papers/links)
Education (Scotland) Bill - Detailed call for views - Scottish Parliament - Citizen
Space
Scotland’s Curriculum for Excellence | OECD
Putting Learners at the Centre: Towards a Future Vision for Scottish Education
- gov.scot (www.gov.scot) 
Page 73 of 126

Page 74

Page 74 of 126

Page 75

Midlothian Council
Tuesday 27 August 2024
Item No 8.5 
United Nations Convention on the Rights of the Child (“UNCRC”)
(Incorporation) (Scotland) Act 2024 
Report by Fiona Robertson, Executive Director, Children, Young People
and Partnerships 
Report for Information 
1 Recommendations 
Council are recommended to note the contents of this report as set out
below. 
2 Purpose of Report/Executive Summary 
The purpose of this report is to:
(i) update elected members on the incorporation of UNCRC
into Scots law;
(ii) inform elected members of the actions required to be taken by
the Council in response to the incorporation of the UNCRC
into Scottish law; and 
(iii) the current plan for the delivery of those actions. 
Date Thursday 8 August 2024 
Report Contact:
Fiona Robertson, Executive Director, Children, Young People and
Partnerships
Fiona.Robertson@midlothian.gov.uk 
Page 75 of 126

Page 76

2 
3 UNCRC legislation 
3.1 The UNCRC was adopted by the General Assembly of the United
Nations in 1989 and ratified by the UK Government in 1991. It is the
most widely ratified human rights treaty in the world. The UNCRC was
a landmark treaty, recognising the importance of childhood and the
unique needs of children across the globe. It sets out the civil, political,
economic, social and cultural rights that all children, everywhere, are
entitled to. The rights in the UNCRC are guaranteed to every child,
whatever their ethnicity, gender, religion, language, abilities or any
other status. 
3.2 The UNCRC can be broadly broken down into 3 areas:
i. Protection (from harm and exploitation)
ii. Participation (an active participant in own lives and society)
iii. Provision (education, health care, shelter and nutrition) 
3.3 Since 1991, the UK has been obliged to give effect to the UNCRC as
part of its international treaty obligations. As a result of this, much of
our legislation is already compatible with UNCRC. In particular, the
focus in most legislation impacting children on the best interests of the
child as paramount consideration is a well settled feature of our law
and is a cornerstone of UNCRC. While the UNCRC and the first and
second optional protocols apply in the UK as a matter of international
law, because they had not been incorporated into domestic law they
could not be enforced directly in the Scottish courts. The UNCRC Act
now directly incorporates the UNCRC into domestic law to the
maximum extent possible within the powers of the Scottish Parliament. 
The UNCRC Act places legal duties on public authorities to act
compatibly with UNCRC requirements and provides legal remedies
where they fail to do so. 
3.4 The Community Planning Partnership Single Midlothian Plan 2023-27
sets out the Partnership’s commitment to realising the children’s rights
approach to all of our work and making sure that we embed the
principles of the UNCRC. 
3.5 The United Nations Convention on the Rights of the Child
(Incorporation) (Scotland) Bill was passed on 16 March 2021. It was to
have received Royal Assent in mid-April and was due to come into
force 6 months after Royal Assent (October 2021). The UK government
announced on 13 April 2021 that it was referring the legislation to the
Supreme Court, on the basis that they considered the legislation
exceeded the Scottish Parliament’s devolved powers. In October 2021
the Supreme Court issued their decision which held that certain
aspects of the Bill were out with the legislative competence of the
Scottish Parliament.  In June 2023 the Cabinet Secretary for Justice
and Home Affairs set out the Government’s intention to amend the Bill
to ensure that the compatibility duty in the Bill would only apply when
public authorities are exercising their functions/carrying out duties
under powers in an Act of the Scottish Parliament. The Bill passed the
Reconsideration Stage in Parliament on 7 December 2023, and
Page 76 of 126

Page 77

3
subsequently became an Act on 16 January 2024. The Act came into
force on 16 July 2024.   
Compatibility duty on public authorities Part 2 Section 6 
3.6 Section 6 of the Act places a duty on public authorities not to act
incompatibly with the UNCRC requirements.  The ‘UNCRC
requirements’ are defined within the Schedule 1 of the Act, which
incorporates the direct text of the UNCRC to the maximum extent
possible. Following the Supreme Court decision, some aspects of the
UNCRC text have required to be ‘carved out’ (for example articles
which relate to reserved matters including abduction of children
(international relations), war and armed conflicts (defence), or wording
within articles including the right to acquire a nationality (immigration)). 
3.7 The compatibility duty (also being referred to as the “section 6 duty”)
will therefore apply when a public authority is delivering devolved
functions conferred under: Acts of the Scottish Parliament, a provision
of secondary legislation made under such Acts (unless made under a
power inserted by an Act of the UK Parliament), or common law
powers. It will not apply when functions are delivered under Acts of the
UK Parliament, even in devolved areas, including where text is inserted
by Acts of the Scottish Parliament (or subordinate legislation made
under powers in Acts of the Scottish Parliament) into other enactments
(such as UK Acts or subordinate legislation made under powers in a
UK Act). 
3.8 Only those duties which fall within the compatibility duty can be
challenged under the UNCRC Act in court. This means for example
that the compatibility duty does not apply to services being delivered
under the Education (Scotland) Act 1980, nor the Children (Scotland)
Act 1995. The Education (Additional Support for Learning) (Scotland)
Act 2004 will be within the compatibility duty. In order to determine
whether the duty applies, the local authority will need to identify
whether the statutory function in question was enacted by the Scottish
Parliament or UK Parliament. 
3.9 The section 6 incompatibilty duty applies to those who meet the
definition of a public authority and includes those delivering “functions
of a public nature” and accordingly can extend to private, voluntary and
independent organisations.  It applies to both actions and failures to
act. 
Child rights reporting duty on listed authorities in Part 3, section
18 
3.10 Section 22 of the Act has repealed Part 1 of The Children and Young
People (Scotland) Act 2014, including the section 2 reporting duty on
public authorities. 
Page 77 of 126

Page 78

4
3.11 Section 18 of the UNCRC Act now requires public authorities listed at
section 19 (which includes local authorities) to produce a children’s
rights report every three years which addresses the following four
areas: 
1. Action taken in the previous reporting period to ensure
compatibility with UNCRC requirements
2. Action taken to secure better or further effect of children’s
rights
3. Actions that will be taken in the next year reporting period to
ensure continuing compatibility with UNCRC requirements
4. Actions planned in that period to secure better or further effect
of children’s rights. 
The Act includes a new duty to submit such reports to Scottish
Ministers. Both the standard report and a child friendly version must be
published and submitted. The first children’s rights reports will be due
as soon as practicable from the 31 March 2026.   
Support for public authorities 
3.12 The Scottish Government has published non statutory guidance in
implementing a children's human rights approach and have committed
to publishing statutory guidance to support public authorities in the
implementation and operation of their duties. Other resources in
development include a Children’s Rights Skills and Knowledge
Framework and a child friendly model complaints process. 
Actions required by the Council 
3.13 This is a high-profile piece of legislation and significant work is being
undertaken by Council officers to ensure that the Council proactively
considered its readiness for implementation and that appropriate
systems are established to assess the impact of both current and new
policies and practices for compatibility with UNCRC, in the same way
that it already does for equality, fairness and human rights. 
3.14 It is important that UNCRC is not viewed solely as a piece of legislation
that affects Education and Children’s Services. The Council will have to
exercise all of its powers and duties in line with the UNCRC
compatibility duty. In addition to services which are delivered
specifically for children and young people, there are areas where more
specific assessment of the impact on children and young people will
likely be required. 
Page 78 of 126

Page 79

5
For example: 
i. Housing and Estates
ii. Sport and Leisure
iii. Libraries and Communications
iv. Environmental Health and Trading Standards
v. Land and Countryside
vi. Planning
vii. Transport
viii. Culture
ix. Events
x. Climate Change 
3.15 The Children and Young People’s Commissioner Scotland (“CYPCS”)
has a particular interest in monitoring how public authorities will
implement UNCRC. Children and their families will be able to take civil
action and seek remedies (including damages) where a public authority
has acted, or was proposing to act, incompatibly with the UNCRC. 
Third party organisations carrying out functions on behalf of a local
authority under a contract will also be required to act compatibly. 
3.16 There are two main areas where work is needed to ensure
compatibility. These are relevant to all of the Council’s functions. 
i. Participation and engagement of children and young people. 
This will impact on a wide range of the Council’s functions –
from processes where the views of individual children are sought
(e.g. a pupil in relation to their additional support needs), to
public consultation and engagement exercises involving the
whole community. A child-friendly complaints process will be
required, as well as ensuring the information is published in
child-friendly formats. 
ii. Ensuring that the best interests of children are considered when
making decisions.  This is relevant both for decisions affecting
individual children but also for decisions which affect or are
relevant to the whole population of children and young people in
Midlothian.  The Act now requires us to separately consider the
impact on children and young people, including in situations
where decisions are being made which affect the whole
population. This is likely to require a form of Children’s Rights
and Wellbeing Impact Assessment.  The policies and
procedures of the Council will require to reviewed to ensure that
they implement a children’s human rights approach and that
they reflect the duties under the Act.   
Next steps 
3.17 In order to be prepared for implementation the following actions are
being taken forward: 
(i) Nominated lead officers from relevant services sit on the
UNCRC Working Group
(ii) Awareness raising and training for staff with the following aims:
Page 79 of 126

Page 80

6
(a) Assessing how complaint current policies and practices
are; 
(b) Equipping staff with information about UNCRC and what
it means in practice for the Council;
(c) Bringing about any necessary changes in practice and
culture relating to participation/engagement with children
and young people;
(d) Developing and implementing a children’s rights and
wellbeing assessment framework;
(e) Developing appropriate models to ensure active
participation and engagement with children and young
people across all of the Council’s functions; and
(f) Developing an appropriate reporting format, to comply
with the reporting requirements set out in the Act. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
No additional funding is available to undertake the significant amount of
professional learning and development required for all Council staff and
our partners or the review and updating of current policies. Resources
have been made available by national bodies, but this will require to be
delivered by officers from within the council. 
4.2 Digital 
There are no direct digital implications arising from this report. 
4.3 Risk 
The Council will update its risk register to take account of potential
liability if any court actions are raised. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
There are no equality issues arising directly from this report. The
Council is currently developing a revised integrated equality impact
assessment framework to take cognisance of the duties placed on it. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications 
Page 80 of 126

Page 81

7
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Reducing the gap in learning outcomes
Reducing the gap in health outcomes
Reducing the gap in economic circumstances 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value
Not applicable at this stage. 
A.5 Involving Communities and Other Stakeholders
No requirement at this stage
A.6 Impact on Performance and Outcomes
No impact 
A.7 Adopting a Preventative Approach
As stated within the Single Midlothian Plan 2023-27 the Getting it
Right for Every Midlothian Child Board is fully committed to realising
the children’s rights approach to all of our work and making sure that
we embed the principles of the United Nations Conventions on the
Rights of the Child. 
A.8 Supporting Sustainable Development 
No impact 
Page 81 of 126

Page 82

Page 82 of 126

Page 83

Midlothian Council
27 August 2024
Item No 8.6 
Children’s Services 2024/25 Service Plan 
Report by Joan Tranent, Head of Children’s Services, Children, Young
People and Partnerships 
Report for Decision 
1. Recommendation
• Council is asked to note the progress made towards improving
outcomes for children and families within Midlothian Council;
• approve the priority actions set out the Children’s Services
Improvement Plan 2024/25; and
• that the Children’s Services Improvement Plan will be shared
more widely, including on the Council’s website. 
2 Purpose of Report/Executive Summary 
The purpose of the attached report is to:
• provide Council with an update on work undertaken to
support Midlothian’s children and families 2023/24; and
• seek Council’s approval of the priority actions as set out
in the Children Services 24/25 Service Improvement Plan. 
3 Background 
3.1 This Children’s Service Plan links to and complements the actions
being undertaken to deliver the outcomes set out in the Midlothian
Community Partnership Plan 2023-2027:  
• Individuals and communities have improved health and skills for
learning, life and work 
• No child or household living in poverty 
• Significant progress is made towards net zero carbon emissions by
2030     
3.2 This Children’s Services Improvement Plan brings together the medium
and long-term activities to ensure our children, young people, families
and our communities are provided with a variety of supports and
services to enable them to build a sustainable future that is equitable
and provides opportunities for all. 
3.3 We will continue to embed a culture of continuous improvement and
innovation across the Directorate, in partnership with colleagues and
services within the Place Directorate. The Plan sets out how we will
achieve our vision, what actions we will undertake and how we will
measure our success. 
Page 83 of 126

Page 84

Update 
3.4 There have been a number of successes and achievements within the
service over the past year. The strengthened partnership working
within the wider Children, Young People and Partnership Directorate
has been key to us being able to offer the right support at the earliest
opportunity to children, young people and their families within our
communities. 
A review of the differing referral routes into children’s services has
successfully enabled the service to redirect referrals into appropriate
services such as Income maximisation, Scottish Welfare Fund, Family
Wellbeing Service and Early Intervention. 
Whilst there continues to be a significant and unparalleled increase in
referrals into children’s services the number of children’s names on
child protection register remains consistent reflecting the impact of
effective early intervention. 
The numbers of children’s names on the Child Protection Register at
the end of Q4 reporting was 42 which equates 2.2 per 1,00 population
of Midlothian, comparable with the Scottish average which is 2.3.  This
is a similar picture with looked after at home, our numbers equate to
2.1 per 1000 population which Scottish average is 2.6.  For looked after
and accommodated children the Midlothian data reports 7.4 per 1000
children whilst the Scottish average is much higher at 9.7.  This data
supports our theory that we are accommodating less children and
therefore are supporting families to remain together where safe to do
so.  As with all data the numbers change on a daily basis therefore a
degree of caution is required. 
Midlothian’s Promise workstreams are well underway and continue to
drive forward the wider partnership and children’s services
improvement actions. 
The Family Wellbeing Service is more established and beginning to
have an impact. A key focus has been working in partnership with
education colleagues to improve children’s attendance and wellbeing.
Over 100 families and 177 children ad young people are being
supported through this integrated service. 
A key aim over the past year was to increase the number of families
who utilised self-directed support, option 1.  This is where families are
assessed and choose to take the funding to organise their own support. 
Over the reporting year there was over a 10% increase in families
choosing this option which in equates to 87 families.    
The Midlothian House Project continues to be held as an example of
excellent practice, as recognised following a recent visit by Fraser
McKinley, Chief Executive of the Promise Scotland. 
Further details about our achievements and challenges can be found in
the Children’s Services Improvement Plan 2024-2025 (Appendix B).
Page 84 of 126

Page 85

4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
While funding is in place for the Whole Family Support Service until the
end of financial year 2025, the long-term funding implications need to
be considered.  There is also ongoing recruitment issues where the
public sector is competing with the salaries provided by the private
sector and agencies, leading to staffing shortages in key areas. 
4.2 Digital 
There are no digital implications directly arising from this report. Digital
Services are involved in the delivery of individual projects in line with
requirements. 
4.3 Risk 
The key risk is budget efficiencies leading to gaps in key service areas,
overwhelming the wider Children’s Services provision, and impacting
our ability to deliver parts of the service plan.  The cost-of-living crisis
could also see large increases in demand on the service, which will be
difficult to manage given current recruitment difficulties. 
4.4 Ensuring Equalities 
We are fully committed to realising a children’s rights approach to all of
our work and ensuring that we embed the principles of the United
Nations Conventions on the Rights of the Child (UNCRC). 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Page 85 of 126

Page 86

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan
Reducing the gap in learning outcomes
Reducing the gap in economic circumstances 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value
Every decision involved in delivering the service plan is considered
from a Best Value perspective. 
A.5 Involving Communities and Other Stakeholders
The development of this service plan has been driven by the needs of
our community and will be delivered in partnership with private and
voluntary providers. 
A.6 Impact on Performance and Outcomes
The delivery of this service plan will result in medium and longer-term
positive impacts upon the two key related priorities of the Single
Midlothian Plan. 
A.7 Adopting a Preventative Approach
Providing a high-quality service to our children and wider community is,
by its very nature, preventative. 
A.8 Supporting Sustainable Development
Not applicable. 
Page 86 of 126

Page 87

CHILDREN’S SERVICES 
SERVICE PLAN 
2024-25 
OUR VISION 
All children, young people, adults and families in Midlothian are supported
to be the best they can be.  This is achieved through a nurturing, respectful
and collaborative approach that promotes wellbeing, equity and inclusion. 
Joan Tranent 
CSWO & Chief Officer Children’s Services, Partnerships & Communities  
Midlothian Council  
Fairfield House  
8 Lothian Road  
Dalkeith  
EH22 3Z 
Page 87 of 126

Page 88

CONTENTS       
Introduction ...................................................................................................................................... 1 
Success and Achievements:  April 2023- March 2024 ..................................................................... 3 
Challenges ........................................................................................................................................ 7 
Children’s Services Structure ........................................................................................................... 9 
Key priority areas for 2024/25 ........................................................................................................ 11 
Key Drivers ...................................................................................................................................... 13 
Children’s Services Improvement Plan for 2024/25 ...................................................................... 14 
Page 88 of 126

Page 89

1 
INTRODUCTION 
This document provides the reader with a basic understanding of the service.  
The purpose of this service plan is to: 
▪ Clearly show the key tasks and challenges of the service. This provides direction and an
overview of the service’s plans to those within and out with the service. 
▪ Provide a basis for measuring and reporting on the progress of the service in achieving its
priorities. 
▪ Provide an overarching plan which supports the link between individual staff performance
and development plans, work plans, team plans and Council and Community Planning
priorities.   
The Community Planning Partnership (CPP) draw together public, voluntary, and private sector
bodies, and local communities to deliver a shared ‘plan’ to improve the lives of local people
based on evidence. In Midlothian, the plan is called the Single Midlothian Plan (SMP). This is a
shared partnership plan of how we will meet the needs of our local communities and brings
together all the priorities for Midlothian into one place. Our outcomes for the next five years are: 
▪ Individuals and communities have improved health and learning outcomes, 
▪ No child or household need live in poverty, 
▪ Significant progress is made towards net zero carbon emissions by 2030. 
In Midlothian the Getting It Right for Every Child (GIRFEC) Board is one of the subgroups of the
CPP, and one of the main drivers for the effective delivery of services to children. The GIRFEC
Plan also known as the Integrated Children’s Service Plan 2023-26, is a statutory three-year plan
devised by the local authority and health. The plan outlines four priority themes and several
actions which are designed to improve the lives of children, young people, and families and in
doing so, deliver on the three outcomes already outlined in the Single Midlothian Plan. The priority
themes are as follows. 
1. Children and Young People’s Rights
2. Children and Young People’s Mental Health and Wellbeing
3. Whole Family Wellbeing
4. Information Sharing and Commissioning 
We continue to be fully committed to realising a children’s rights approach to all our work and
ensuring that we embed the principles of the United Nations Conventions on the Rights of the
Child (UNCRC) and remain fully committed to our Promise commitments. 
Like the rest of Scotland, we continue to experience the impact of the pandemic aftermath, the
cost-of-living crisis, and the unprecedented changes within the economic, political, and social
Page 89 of 126

Page 90

2 
landscape which brings both opportunities and challenges. Midlothian is one of the fastest
growing Councils and has a relatively young population, with around 26% of residents aged
between 0-21 years of age. This has increased over recent years, and the trend is expected to
continue. 
Midlothian Council continues to face demands and pressures never previously experienced. We
are extremely proud to report that we have risen to each challenge and developed new and
innovative approaches and services to meet the growing strain on service. This is due to the
commitment and sheer determination of our workforce, our partners and not least our kinship
and fostering population. 
This annual Children’s Services Plan 2024-25 describes how Children’s Services will continue to
build on this learning moving forwards, harnessing the energy, flexibility and creativity
demonstrated by our workforce and key stakeholders.  Embedding a culture of continuous
improvement and innovation across the Directorate, in partnership with colleagues and services
within the Place Directorate. The plan sets out how we will achieve our vision, what actions we
will undertake and how we will measure our success.      
Page 90 of 126

Page 91

3 
SUCCESS & ACHIEVEMENTS: APRIL 2023-MARCH 2024 
General
There have been many successes and achievements over the past year, as well as many changes.
While the following is not an exhaustive list it provides a snapshot of some our achievements 
Referrals -Child Protection 
A key workstream for 2023-24 was to map and review the differing referral routes into Children’s
Services to support us have a clearer overview and understanding of the significant increase in
referrals. This piece of work proved to be successful and enabled us to redirect referrals into the
appropriate services, such as Income Maximisation, Scottish Welfare Fund, Family Wellbeing
Service and Early Intervention. This also meant families who required targeted social work
intervention got the support they needed. This has led to greater confidence that referrals coming
into Children’s Services are appropriate leading to greater efficiency and better outcomes.   
While we have experienced a significant and unparalleled increase in referrals into the services, the
number of children’s names on the child protection register has remained consistent. This strongly
suggests that the investment into services at an earlier stage to promote families remaining
together, continues to reap rewards. Services such as Family Wellbeing Service, Family Systemic
Work, Family Group Decision Making and the Income Maximisation Officers, continue to go from
strength to strength. As always, the child protection numbers do come with a health warning as
these number can be impacted by larger families. The main reason for registering a child’s name on
the register continues to be the risk posed by domestic abuse although the impact of poverty
remains a constant feature for those using our services. 
In 2023, Children’s Services were also involved in developing and implementing the revised
Edinburgh and the Lothians Multi-agency Child Protection Procedures. 
The Promise
Midlothian’s Promise workstreams are well underway and continue to drive forward the wider
partnership and Children’s Services improvements. The 2024-30 priority areas are: 
• A Good Childhood 
• Whole Family Support 
• Supporting the Workforce
• Planning 
• Building Capacity 
Midlothian’s Looked after Children and Young People 
As of March 2024, there were 194 looked after children in Midlothian, which equates to 0.95% of the
0–17-year-old population.  As with our child protection figures these numbers have remained
consistent over the last few years. Therefore, despite the increase in referrals the figure would
suggest that realigning services and budgets towards earlier interventions is proving to be
successful. Our underpinning principle continues to be that wherever it is safe to do so children and
Page 91 of 126

Page 92

4 
young people will live in a safe, stable, and nurturing family environment. If it is not possible for a
child to remain within their birth families, we would always seek to place the child with their own kin
before exploring any other alternative arrangement.  In line with the foundations of The Promise, we
firmly believe that children should be able to maintain their relationships with friends, siblings,
family, school, and communities and for that reason we are unwilling to place a child far from
Midlothian. There are some occasions when we may have to place a child further than we would like
although this is rare and often linked to particular care needs. 
Looked after Population Numbers Percentage
Total 194 
At home with parents 42 22%
Friends and relatives 69 36%
Foster Carers 57 29%
Prospective adopters 6 3%
Residential, Schools & Secure 20 10% 
Aftercare/Continuing Care  198 
Receiving Aftercare Services 61 31%
Continuing Care 117 59%
After Care/National Housing Project 20 10% 
We have striven to focus our attention upon the overview and scrutiny of permanence planning for
our children and young people, whether this be within the family home, kinship care or out with the
family. 
Family Wellbeing Services 
The Family Wellbeing Service which was softly launched in 2023 is beginning to have an impact. The
investment of resources provided by Education has meant that the team can support schools to
improve children’s attendance and wellbeing. While still in its infancy a significant amount of
investment has gone into the team to ensure the team and others have a good understanding of their
role and remit. They are already working with 100 families and 177 children and young people; this
equates to 172 referrals over the past year.  We were fortunate to appoint a permanent Team Leader
into the Family Wellbeing Service in January 2024 who has a wealth of experience. Work is well
underway with our 3rd sector partners to agree how we allocate funding to support a holistic
approach to working with families in Midlothian. The aspiration is that as the Family Wellbeing
Service consolidates and expands their reach, there will be a reduction of referrals into Children’s
Services. 
Self-Directed Support for children impacted by Disability. 
There has been an 80% increase in the number of families using Self Directed Support options which
is a great achievement, thus allowing families to determine how and when they wish to utilise
funding to support their children and young people.   
Page 92 of 126

Page 93

5 
Family Group Decision Making
We continue to commit to having Family Group Decision Making as a core part of Children’s
Services. We have committed to providing ongoing funding for this area of work going forward. 
Midlothian Housing Project
In June 2023, a report was taken to Council to approve the Midlothian Housing Project becoming a
permanent element of the Children’s Services structure. During this reporting period we now have
a total of 30 young people having moved into their own permanent home through the intensive
support from Housing Project team.   
The Midlothian House Project continues to be held an example of excellent practice, as recognised
following a recent visit by Fraser McKinley, Chief Executive of the Promise Scotland. 
Children and Young People in Conflict with the Law
Our local, collaborative approach towards youth justice, which involves key partners; Education,
Community and Lifelong Education, 3rd Sector, Police Scotland, Children’s Services, and Business
owners continues to develop creative approaches to reduce youth offending. This has been
achieved through using a successful, restorative approach to reduce crimes involving shoplifting,
weapons, or anti-social behaviour. 
We have engaged with CYCJ and colleagues in neighbouring authorities to share experiences and
learning with a view to ensuring that we continue to provide a robust response to our children and
young people in conflict with the law. 
Care Homes  
In 2022 our two Children’s Houses were inspected by the Care Inspectorate and received ‘very good’
grades. This was a significant achievement.     
Foster Care 
In February 2024 the Council approved a 5.5% fee increase for foster carers this was in addition to
the Scottish Recommend Allowance being agreed by Scottish Government.  We plan to embark on
a recruitment campaign for foster carers, short break carers and carers who may wish to foster
unaccompanied asylum seeking children in Summer 2024. 
Income Maximisation and Child Poverty 
Our earlier identification of families who may need additional support from the Scottish Welfare
Fund means that families are provided with earlier supports to prevent poverty crisis. In 2023, the
Income Maximisation Officers within Childrens’ Services assisted 48 families through 429 individual
advice sessions. In total they advised on 1095 issues and achieved £130,123 in financial gain for
local families. 
Hawthorn Family Learning Centre  
During 2023, both the operational and service manager returned to work having been on maternity
leave. This has enabled several service developments to take place and plans are well underway to
Page 93 of 126

Page 94

6 
ensure the service can meet the increased demands as well as pressure on resources during 2024-
25. The centre continues to be a pivotal part of the community and is instrumental in developing
initiatives to support local children and families. 
Unaccompanied Asylum-Seeking Children 
We continue to support and identify accommodation for our unaccompanied asylum-seeking
children and young people who come to Midlothian via the national transfer scheme.  This scheme 
mandates all local authorities to accept children and young people who arrive in the UK,  mainly on
the small boats arriving in Kent.   In addition, we also support families arriving from Afghanistan and
the many families fleeing from Ukraine because of the war.  Many of the Ukrainian families arrived
in Midlothian as part of the Scottish Government hosting scheme which was a significant piece of
work.  The work involves a very small team of staff who work tirelessly to ensure that all families who
were placed with a host in Midlothian were welcomed and reassured that the relevant checks had
been undertaken prior to their arrival. They were further supported by a variety of different agencies
to enrol their children in nurseries and schools, find employment, and integrate into their new
communities.   
Page 94 of 126

Page 95

7 
CHALLENGES 
Workforce 
Like the national and UK-wide landscape, Midlothian continues to experience the same workforce
issues encountered by other Councils. There is a general lack of experienced and skilled staff across
the sector, which has inadvertently led to higher rates of absence due to the pressures and demand
placed on our experienced, permanent staff. This means we have had to increasingly rely on locum
workers. 
National Care Service 
While we are yet to discover whether Children’s Services and Justice will become part of the
National Care Service, discussions are already underway regards a National Social Work Agency
which would offer national workforce terms and conditions for social work across Scotland. As the
national debates progress, we will continue to focus our efforts locally to recruit and retain staff. 
Recruitment of Foster Carers 
Another significant challenge is unsurprisingly the recruitment of foster carers which again, is also
a national issue. As the current fostering population ages, it is becoming increasing difficult to
replace our existing cohort which is mainly due to a range of social, economic, and political factors,
A key priority for Midlothian in 2024 is to create and launch an innovate local recruitment campaign,
utilising social media in a bid to attract bespoke and varied foster carers.
The Care Inspectorate inspected our Fostering, Adoption and Continuing Care services in
September 2023.  The grades awarded were 3 (adequate). This was disappointing however should
be considered in the context of this being a very unsettled time within the team with many staffing
changes.  An improvement plan is in place with progress regularly reported to the Social Work
Assurance Group (SWAG).   
Poverty 
Despite the investment into Income Maximisation Officer the cost-of-living crisis continues to add
significant pressures and demands on all our services. While we have realigned budgets to focus on
earlier intervention services, we are aware that the pressures and demand associated with poverty
will continue. This is an area we will monitor and review throughout 2024-25.   
Child and Mental Health Service – Waiting Times 
The number of children on the Child and Adolescent Mental Health Services (CAMHS) waiting list is
monitored and reported on to Scottish Government.  The ever-increasing waiting list for children and
young people awaiting a neurodevelopmental assessment is the biggest concern with an average of
200 names being added to this waiting list every quarter.  Whilst this is not unique to Midlothian,
there are real concerns that children will be ‘aged out’ before they are ever offered an appointment. 
Whilst not all cases will require clinical input the concerns are around how we support children and
families in the interim.  A key priority is the Lothian wide workstream who are looking at the
development of a neurodevelopmental pathway to support local children and young people with
ASN and Complex and Enduring Needs.
Page 95 of 126

Page 96

8 
We are working with CAMHS at establishing a Single Point of Access which shall initially only deal
with mental health referrals but will through time include all referrals into children’s services,
education and family support services. 
Children and Families impacted by Disability 
We have seen an increase in the numbers of families being provided Section 23 assessments of
unmet need and  choosing to use Self-Directed Support. While this is a positive move, a major
challenge has been the lack of resources within communities to support families with short breaks
or clubs for children who have additional support needs.  Many organisations do not provide
services for families of children impacted by disability because of the expenditure needed in terms
of staffing, skill, and equipment. As the numbers of children being diagnosed with an additional
support need increases, we need to be more creative and innovative around providing services.
During 2024, we will develop a longer-term vision for children with disabilities that includes
strengthening the interface within the Council, Education, Adult Health & Social Care and the 3rd
Sector. We have restructured the Children’s Services senior team to include a dedicated Service
Manager to focus on this area. 
Page 96 of 126

Page 97

9 
CHILDREN’S SERVICES STRUCTURE 
Duty and Early Assessment Teams 
This team consists of social workers and children and families’ practitioners who undertake all
initial assessments, child protection, short term work and report writing. At the time of writing, we
have developed a bespoke, small team to focus on the Section 23 assessment, packages of care
and/or any accompanying Self-Directed Support. This will become part of the wider 2024-25
Disability strategy and work streams.    
Early Intervention & Prevention Manager and Promise Lead 
This officer supports the Corporate Parenting and Promise workstream throughout the Midlothian
partnership and is responsible for ensuring the priorities and actions identified as part of #Keeping
the Promise in Midlothian, are on track.  The officer also plays a key role in supporting and
progressing the agenda for children and young people in conflict with the law. The officer has robust
links with internal and external services and partners and manages service contracts.   
Practice Team 
The social workers and children and family practitioners within the practice team support children
who are on the child protection register or at risk of becoming accommodated or looked after either
at home or away from home. 
Adopting a children’s rights approach and with the Promise at the centre of all of their work, the
team strive to achieve permanent outcomes for children and young people, ideally within their
family but where necessary in alternative placements. This involves robust assessment and
presentation of information to inform decision making at children’s hearings, permanence panels
and court.  The team  supports several unaccompanied asylum-seeking children, as well as young
people in continuing care, and providing aftercare support to eligible care experienced young
people. The team also supports children and young people in conflict with the law. 
Midlothian House Project 
This service is aligned with the Practice Team and supports young people exiting the care system to
live connected and fulfilling lives, in line with our Promise and corporate parenting responsibilities.
The young people are supported by a holistic team  to enable them to fulfil their potential and to
ensure that no care leaver becomes homeless.  This project has been recognised nationally. There
is also a dedicated worker who supports our unaccompanied asylum-seeking children and young
people. 
Family Group Decision Making Service 
This group of social workers and children and families’ practitioners who provide a service that is
founded on a rights based approach. They work with families to ensure children and young people
are placed with extended family or friends, when safe to do so, before looking at any alternative
arrangement. The team manager also has oversight of kinship care and lifelong links and systemic
Family support. 
Page 97 of 126

Page 98

10 
Systemic Family Support  
This small team also works to support families find their own solutions through an enabling,
facilitated approach. 
Care Homes for Children and Young People 
Our two local care homes offer care and support to children and young people aged 8-18 to ensure
they remain within Midlothian, within their communities and close to family and friends. The last
inspection awarded grades of 5 (Very Good) and commented positively on their nurturing and
trauma informed approach. 
Family Centred Care– Fostering/ Adoption/ Continuing Care 
This team of social workers ensure there are sufficient carers and adopters to meet the needs of
children and families. They also offer ongoing support and training to foster carers including kinship
carers.  This team offers a critical resource to children’s services. An inspection was held in 2023,
where the grades awarded were 3 (adequate). This was at a time when there were several changes
associated with the team. Since this date there has been an investment into the carers population,
recruitment of workers and an improvement plan is in place with progress regularly reported to the
Social Work Assurance Group (SWAG). 
Reviewing Officers (RO) 
The RO’s are qualified social workers, and chair all child protection, looked after away from home
and looked after at home reviews. They ensure that planning is being progressed and highlight and
report on any drift or barriers within the care planning. They provide a monthly quality assurance
report to senior officers highlighting good practice, areas for development and any particular trends
within practice. This information is shared with team leaders and our learning and development
colleagues to inform future training needs.    
Midlothian Family Wellbeing Service 
This team was set up through the Whole Family Wellbeing Funding (WFWF) and additional resource
provided by Education as part of its restructure, and a commitment to design a new service that
offers support at a much earlier point of contact. Though we have recruited the team, it is still in its
infancy and will inform the 2024-25 actions going forward. 
Page 98 of 126

Page 99

11 
KEY PRIORITY AREAS FOR 2024/25 
Families Impacted by Disability
This is a key priority for 2024-25. We intend to reshape the senior manager structure to include an
additional Service Manager within the current budget who will work with Education, Adult Health
and Social Care, and the 3rd Sector to deliver a model of care that focuses on providing seamless
transitions for children and young people who have additional support and complex needs. The
model will incorporate the underpinning principle of good transitions and provide a pathway to
improve support as well as manage expectations for both families and workers. 
Neurodevelopmental pathway 
As already highlighted the number of children awaiting an appointment for a neurodevelopmental
assessment is increasing at a worrying rate. It is anticipated that not all cases will require a clinical
input from CAMHS so a key priority for 2024/25 will be the development of a neurodevelopmental
pathway to support local children and young people with ASN and Complex and Enduring Needs. 
Family Wellbeing Service 
During 2024-25 we will continue to consolidate and expand the service to ensure that is truly holistic
in its support of families who need to access support and resources when they require them. A key
workstream will be the collaboration with the 3rd sector to ensure our joint resources can respond
to need. We want to deliver a service that is both creative and trauma informed in its approach and
can demonstrate that it empowers families to find solutions through a range of support and
interventions. Key actions will include how we continue to support families and employees through
the cost-of-living crisis that is impacting Midlothian and beyond.     
Unaccompanied Asylum-Seeking Children (UASC) 
This is an area of work that has grown exponentially over the past few years and the team have
worked hard to meet the ongoing requests for placements. The number of young people arriving in
Midlothian who require to be looked after in a safe environment has increased leading to a strain on
resources and, like Councils across Scotland, the pressure is unsustainable long term. In addition
to this we continue to resource a team for those arriving from Ukraine and Afghanistan.  The
increased pressure on resources across Midlothian is significant as we adapt and create different
models of working to ensure we can meet future demand.    
Foster Carer Recruitment 
There is a national shortage of foster carers across Scotland and despite many attempts to find a
national solution to recruiting more foster carers this continues to be an ongoing challenge.  We
increased our foster care fees foster care in 2023-24 and agreed a key priority for 2024-25 isa to
invest in a online and social media campaign in an effort to increase our foster care population. This
recruitment strategy is due to commence in May/June 2024. The impact of this is that we have very
limited resources within Midlothian and need to enhance and therefore need to ensure we have
sufficient care placements to keep all children and young people within Midlothian. 
Page 99 of 126

Page 100

12 
Workforce 
There is a national shortage of workers within social work and social care across Scotland.
Recruitment and retention of social workers is a concern.  Scottish Government are supporting the
development of a national social work agency which would offer the same working terms and
conditions to all workers across the nation.  This would benefit Midlothian who are in constant
competition with larger neighbouring local authorities’ salaries which are significantly greater than
ours.   
In addition, we are committed to supporting our existing workforce with their health and wellbeing.
We want to ensure we have a workplace culture that is supportive, inclusive and focused on learning
and improvement. In 24/25 we will undertake consultation to explore ways to improve staff
wellbeing and the workplace culture. 
Page 100 of 126

Page 101

13 
KEY DRIVERS 
United Nation Convention on the Rights of the Child (UNCRC) 
The Convention has 54 articles that cover all aspects of a child’s life and set out the civil, political,
economic, social, and cultural rights that all children everywhere are entitled to. It also explains how
adults and governments must work together to make sure all children can enjoy all their rights.
Adopting and embedding the UNCRC articles will be a key focus going forward.    
The Promise 
In October 2016, the First Minister announced an independent ‘root and branch’ review of the
children’s care system (“The Care Review”). The review concluded that while much had been done
to support children and young people who became part of the care system it was piecemeal and
inconsistent across Scotland. The ‘Independent Care Review’ concluded that services needed to
improve as a matter of urgency. Consequently ‘The Promise’ emerged as a key driver for
transformational change. The Promise provides a strong basis for transforming and strengthening
services to support parenting and ultimately, improve the lives of looked after and care experienced
children and young people in Midlothian.    
National Care Services  
The Scottish Government have laid a Bill in parliament which seeks to establish a 
National Care Service. The Bill essentially provides a brief outline as to what a National Care Service
could look like in terms of power and responsibilities for Scottish government and Councils, though
further discussion is to take place. There will also be further consultation as to whether Children’s
Services and Justice Services would transfer over to the National Care Service. We await further
details on the proposal and will make sure all workforce and other stakeholders are kept informed.   
Mental Health Services 
The increase in requests for mental health support continues to be a challenge, not just within
Midlothian but across the country. Additional funding from Central Government has enabled us to
collaborate and work with our 3rd Sector colleagues to develop a range of less stigmatising services
that children and families can access at an early stage to support their mental health and wellbeing.
Discussions are ongoing to further develop services, and this remains a priority area of work over
the coming year. 
Children's Care and Justice Bill 
The age of criminal responsibility was raised from 8 years of age to 12 years of age in 2021. The
intention of the Children's Care and Justice Bill is to divert children and those under 18 from
becoming involved with justice services by supporting them through age-appropriate systems and
services. The Children's Care and Justice Bill also aims to reduce the number of children in Young
Offenders’ Institutions and reform the placement of children in secure care. We welcome the
legislation which endorses our local services which are founded on diverting children away from
criminal proceedings. 
Page 101 of 126

Page 102

14 
CHILDREN’S SERVICES IMPROVEMENT PLAN FOR 2024/25   
Service Priority Actions  Performance Indicator  Due Date  Target  Baseline  Previous
Trend 
Data 
Managed By  Source  New 
Indicator for
2023/24   yes
or no 
1 Ensure the Midlothian
Wellbeing Service is
aligned with other family
supports across 
Midlothian    
Develop transparent pathway to
ensure 3rd sector partners have
equitable access to funding
resources within the Family
Wellbeing Service.    
31/03/25  New 
Measure  
23/24 0 Rebecca
Hooton
Chief Officer  
Internal
Systems   
No 
Develop a series of performance
indicators and baseline figures to
measure outcomes for Family
Wellbeing Service 
31/03/25 New 
Measure 
0  N/A  Rebecca
Hooton  
Chief Officer
Internal
Systems   
Yes 
2 Develop a transitions
strategy and pathway
across Children’s
Services, Education and 
Adult Health & Social Care 
1st Phase 
Map and review existing interface
to support the  proposal for
standalone disability/transitions
team. 
31/03/25   New 
Measure      
o Emma Clater
Service
Manager
Internal
Systems   
No 
Develop a disability transition
policy that supports children
moving into adult services who
have additional support needs   
31/03/25  Linked to
disability and
ND
workstreams 
N/A  N/A  Emma Clater
Service
Manager 
Yes 
Page 102 of 126

Page 103

15 
3 Maintain supports offered
by Family Group Decision
Making and Kinship staff
to ensure children remain
with birth/ kin families.   
Increase the number of families
who participate in Family Group
Decision 
Making 
31/03/25  2023-24
Figures 
23/24 data  Lesley Watson
Service
Manager 
Internal 
Systems   
Yes 
Increase the number of families
who have a Family plan included
in their care plan
31/03/25  2023-24
Figures 
23/24 data  Lesley Watson
Service
Manager 
Internal 
Systems   
Yes 
Increase the number of Kinship
assessment undertaken.    
31/03/25  Increase by
30% 
22/23       22/23 data  Lesley
Watson 
Service
Manager 
Internal 
Systems 
Yes 
Develop and implement
permanence process to formally
secure children in  
kinship   
31/03/25  1 X clear
policy (linked
to perm. 
policy   
N/A  0   All Service
Managers 
Internal 
Systems 
Yes 
Evidence learning from
complaints and unplanned
endings is shared across the
service. 
31/03/25 100%
learning
shared 
New 
Measure 
N/A (new
Measure)  
All Service
Managers 
Internal
systems 
Yes 
Continue to review and develop
the support offered by the
Practice Team
31/03/25 Ongoing
review of
progress
New
measure 
Lorrette Nicol
Service
Manager
Internal
systems
Yes 
Strengthen the number
staff who understand the
Increase the number of staff and
carers trained in using a trauma
informed approach   
31/03/25  25  20  N/A   All Service
Managers  
Internal
systems 
Yes  
Page 103 of 126

Page 104

16 
importance of trauma
informed practice 
Continue to promote training
opportunities and development
for 
all Children’s Services staff 
31/03/25      23/24
figures 
23/24  Learning and
Development
/Service 
Managers 
Yes 
Offer a range of activities and
sessions that support staff 
wellbeing 
31/05/25   
Service
Managers/OD 
Yes 
Page 104 of 126

Page 105

Midlothian Council
Tuesday 27 August 2024
Item No 8.7   
Fair Work First – Implementation Update 
Report by Saty Kaur, Chief Officer Corporate Solutions 
Report for Information 
1 Recommendations 
Council is asked to:
• note the good practice areas with regards to the Fair Work First
agenda;
• note the ongoing work to continue to embed Fair Work First
across the organisation; and
• note the work in progress to develop the Workforce Strategy,
linked to the Blueprint Transformation Theme 2 – 21st Century
Workforce which will be drafted in Autumn 2024. 
2 Purpose of Report/Executive Summary 
To provide Council with information on the steps taken to achieve the
Fair Work First requirement. 
Date Monday 5 August 2024 
Report Contact:
Saty Kaur, Chief Officer Corporate Solutions
Saty.Kaur@midlothian.gov.uk 
Page 105 of 126

Page 106

2 
3 Background/Main Body of Report 
3.1 Fair Work First is the Scottish Government’s policy for driving high
quality and fair work, and workforce diversity across the labour market
in Scotland by applying fair work criteria to grants, other funding and
public contracts being awarded by and across the public sector, where
it is relevant to do so. Through this approach, the Scottish Government
is supporting employers who adopt fair working practices, specifically: 
• payment of at least the real Living Wage (RLW)
• provide appropriate channels for effective workers’ voice, such
as trade union recognition
• investment in workforce development
• no inappropriate use of zero hours contracts
• action to tackle the gender pay gap and create a more diverse
and inclusive workplace
• offer flexible and family friendly working practices for all workers
from day one of employment
• oppose the use of fire and rehire practice. 
3.2 The Fair Work Convention’s Framework defines Fair Work as work that
offers effective voice, fulfilment, opportunity, respect and security.
These dimensions will be present in different ways in different
workplaces, aiming to balance the rights and responsibilities of workers
and employers. They should be visible in the attitudes, behaviours,
culture, policies and practices within an organisation – demonstrating
the value placed on fair work and equal opportunity in work. The Fair
Work First criteria align with the dimensions of Fair Work, and are
focused on:  
• providing a decent standard of living and income
• offering security of contract, including hours and earnings; other
entitlements including sick pay and pension
• fostering an environment where workers’ views are actively
sought, listened to and can make a difference, including through
a stronger role for trade unions
• giving opportunities for all to learn, develop and progress
• creating a healthy and safe environment, where individuals’
wellbeing is actively supported
• enabling people to have a good work-life balance
• supporting people to feel valued and respected and that they
have a sense of purpose in work and wider society
• creating fair, diverse and inclusive workforces
• promoting innovation and productivity. 
Page 106 of 126

Page 107

3 
Examples of best practice 
3.3 The Scottish Government has provided resources on Fair Work First
including best practice examples for the Fair Work First criteria. 
3.4 Appropriate channels for effective workers’ voice, such as trade union
recognition:   
Collective voice channels
• Providing access to trade unions and making workers aware that
they can join a union of their choice.
• Involving trade union/worker representatives in key governance
and decision-making structures.
• Recognising trade unions for the purpose of collective
bargaining and encouraging membership, where this is the
workforce’s preferred route, and providing appropriate facility
time for supporting regular engagement between union/s and
members.
• Constructive dialogue between the employer, workers and
where appropriate a relevant trade union/s to address workplace
issues or disputes, e.g. absence management, grievance, health
& safety. 
Individual voice channels
• Regular surveys are carried out to understand worker views,
including how well they feel effective voice is facilitated in the
organisation, and are involved in agreeing and progressing
improvement action.
• Formal and informal arrangements are in place through which
meaningful individual and collective dialogue take place,
including one-to-ones between workers and management,
appraisal/feedback processes, team/organisation meetings.
• Appropriate collective consultation and a clear route for
resolving issues at both individual and collective levels, such as
through a grievance or collective disputes procedure.
• The organisation promotes a strong culture of openness and
transparency and encourages acceptance of different
viewpoints. 
3.5 Investment in workforce development:
• Learning & development is integrated in the organisation’s
strategic planning and workers and management jointly identify
development needs and priorities, ensuring both individual and
organisational needs are met.
• Regular equality and diversity training is provided for all staff.
• Learning & development opportunities are provided, and
regularly reviewed, to help build the organisation’s resilience and
responsiveness to change.
• Managers have development discussions with individuals and
teams and prioritise this as part of operational activity.
Page 107 of 126

Page 108

4 
• Workforce Development Plans and Succession Management
Plans are in place.
• Formal and informal learning is offered across the workforce,
relating to people’s particular role and wider development.
• The organisation is committed to providing apprenticeships.
• The organisation is committed to supporting the Young Person’s
Guarantee.
• Staff are supported to keep their professional qualifications up-
to-date.
• The organisation has an appropriate charter mark achievement
such as Investment in People or EFQM.
• The organisation invests in and utilises the skills and knowledge
of union equality, learning and other workplace representatives
and resources.
• Constructive engagement with union learning reps and Scottish
Union Learning activities.
• Carbon literacy training is provided for all staff. 
3.6 No inappropriate use of zero-hours contracts:
• All staff are employed on open-ended or fixed term contracts
with confirmed hours and work pattern.
• All staff have a contract which accurately reflects the hours
worked, guarantees a fair minimum number of hours per week
and does not involve compulsory overtime.
• Staff get reasonable notice of shifts – at least 4 weeks ahead of
time and are paid for cancelled shifts within this period.
• Core and flexible staff resources are reviewed at least annually
to determine if any staff on a zero-hours or minimum-hours
contract can be moved to a permanent or fixed-term contract
with a fixed number of hours and/or a regular pattern.
• Zero-hours contracts are not used to the detriment of workers
with protected characteristics and where this is happening, the
organisation is taking remedial action.
• Zero-hours contracts are not used to fill actual longer-term
vacancies.
• There is a clear, published policy and process to enable
someone to request a move from a zero-hour contract with
guaranteed and set hours.
• Gained or working to gain Living Hours Accreditation. 
3.7 Action to tackle the gender pay gap and create a more diverse and
inclusive workplace:
• Recruitment, retention and promotion processes prevent bias
and barriers, for example, ’blind’ recruitment; providing
additional support/adjustments at application and interview
stages; diversity in interview panels; and exit interviews are used
to understand why a person is leaving.
• Workplace adjustments are in place and made for disabled staff
or those with long term health conditions who need it. Additional
support for adjustments are accessed through Access to Work.
Page 108 of 126

Page 109

5 
• Flexible working - which could be a reasonable adjustment to
some – is encouraged across the organisation from day one of
employment, subject to business need.
• Workers have opportunities to influence the organisation’s
approach to workplace equality, including by sharing their own
experiences.
• The organisation gathers data to understand its workforce
diversity and has a plan in place to address under-
representation.
• Governance structures are gender balanced and the
organisation is working to ensure parity for racialised minorities,
disabled, young people and workers over 50 years.
• Enhanced maternity, parental and adoption leave and pay are
available for all staff, and staff are supported to return to work
through keep in touch days and refresher courses.
• A private, healthy and safe environment is provided for
breastfeeding mothers to express and store milk.
• Everyone has equal access to appropriate learning &
development opportunities.
• All staff have opportunities to discuss their support needs with
management.
• There are clear career pathways for women, with support for
those returning to work after maternity or a career break and to
help minority ethnic, disabled and workers over 50 years to
progress.
• The organisation is a recognised Carer Positive employer.
• Employers are able to provide safe spaces for workers to
express their concerns and raise issues and where workers are
confident that their concerns are dealt with appropriately by
trained personnel.
• Policies are in place that align with Equally Safe, Scotland’s
strategy for preventing and eradicating violence against women
and girls (VAWG).
• Staff and policies recognise Commercial Sexual Exploitation as
a form of VAWG and support the policy principles, applying
these to relevant policy and practice.
• The organisation gains Equally Safe at Work accreditation to
prevent workplace sexual harassment.
• Employers promote and support mentally healthy workplaces
where mental health and wellbeing is meaningfully discussed
and where stigma and discrimination is addressed.
• The organisation provides support to women experiencing
menopause in the workplace. Information is available from NHS
Inform and Close the Gap.
• The organisation has a safety policy for workers who finish work
outside of public transport hours to enable them to get home
safely. 
Page 109 of 126

Page 110

6 
3.8 Offer flexible and family friendly working practices for all workers
from day one of employment:
• Organisational policies and practice are in place to support
flexible and family working, developed collaboratively by the
employer, workers, where present, trade union or other worker
representative, in line with legal requirements in terms of
reasonable adjustments, and are regularly reviewed.
• Jobs are designed around business outcomes, not based on
fixed locations or times to provide flexibility.
• Flexible working and family friendly policies are highlighted in job
adverts.
• Employers and workers have constructive conversations about
requests for flexibility. Trial periods or pilots can be used to test
workable solutions for the individual, team and employer.
• Managers get appropriate training and support to enable them to
effectively manage individuals who work flexibly.
• Flexible and family friendly options are available at all levels in
the organisation and for all staff – not just women or mothers,
and to encourage partners to share caring responsibilities
• Flexible working can be offered as a temporary arrangement to
accommodate particular circumstances with review points
agreed at the outset by the employer and the worker.
• Learning and development is arranged to accommodate
different flexible working arrangements and, where practicable,
technology is used to facilitate access.
• Enhanced provision is available to support workers with families,
such as more tailored maternity, adoption, and shared parental
leave and pay.
• Accessible systems and protocols, such as IT equipment and
digital diaries, are used to facilitate effective work practices,
enabling remote workers to participate alongside their site-based
colleagues.
• Meetings are arranged at times that enable workers to attend (in
person, by phone or virtually) so everyone can contribute and
feel included.
• Effective use of flexible and family friendly practice is modelled
from the top down.
• Employers develop and maintain a home and other remote
working policy with consideration given for workers with
protected characteristics and suitable provision to support
workers’ mental health and overall wellbeing.
• Working from home and other remote working is not monitored
by invasive worker monitoring software.
• Employers, workers and, where present, union or other worker
representative, collaborate to agree an approach to flexible and
out-of-hours working, with clear boundaries between work and
non-work time - enabling workers to disconnect outside working
hours.
• Employers with international connections provide flexibility on
hours to manage time differences. 
Page 110 of 126

Page 111

7 
3.9 Midlothian current position
Real Living Wage evidence 
• Living Wage Accreditation – the Council is a recognised Living
Wage Employer, and this is renewed annually
• The Council pays Living Wage for all apprenticeships and 16–
17-year-old workers, as all staff are paid within the current
grading system. 
• All agency/contractors are paid in line with the relevant FTE role
therefore RLW applies. 
Individual Voice 
• Project specific staff engagement where people can submit
individual feedback i.e. hybrid working survey, listen and learn
exercises (i.e. Neighbourhood Services. Building Maintenance
Services)
• Manager forum (established in 2024) brings together Team
Leaders and Service Managers to widen their knowledge, build
management skills and resilience, talk to Senior Managers and
the Corporate Management Team and develop relationships
with peers
• Leadership forum brings together officers in senior leadership
roles to discuss strategic issues affecting the organisation,
inform and influence the strategic direction of the organisation
and the priorities, discuss the financial challenges and identify
new ways of working and innovative cross Council solutions. 
• Directorate drop in sessions lead by the Executive Directors with
all staff to update on Council issues, priorities and listen to
issues that staff have identified 
Collective voice 
• Employee benefits information posted with all job vacancies on
MyJobScotland which references the Council’s commitment to
Trade Union membership 
• Induction checklist which references Trade Union membership 
• Recognition and Procedural Agreement which has a Fair Work
Statement signed by Trade Unions and outlines reasonable time
off for Trade Union duties 
• JCG exists, chaired by the Council Leader, meets every 6-8
weeks and is actively attended by Trade Unions, elected
members and Council officers
• Other Trade Union forums that meet regularly include Midlothian
Negotiating Committee for Teachers (MNCT) chaired by the
Education Chief Operating Officer, Corporate Joint Working
Group (CJWG) chaired by the Chief Officer Corporate Solutions
and Directorate Consultative Group (DCG) chaired by the
Executive Director Place. 
Page 111 of 126

Page 112

8 
There is a short statement on the Council’s website highlighting the
Council’s commitment to advancing the Fair Work First criteria,
including the real Living Wage and effective voice conditions. This has
been developed with and signed off by Trade Union representatives
and included in the Recognition and Procedural Agreement: Fair Work
practices | Fair work practices (midlothian.gov.uk) 
Other actions
• A short statement is to be added to the Council’s website to state
that the Council does not use zero hours contracts and opposes the
use of hire and rehire practice
• A range of family friendly policies have been adopted by the Council
demonstrating action to tackle the gender pay gap and create a
family friendly workplace including:
o Adoption Policy
o Carer Policy
o Family Leave Policy
o Flexible Retirement Policy
o Hybrid Working Policy
o Maternity Policy
o IVF and Miscarriage Policy
o Equalities and Diversity Framework
o Gender Based Violence Policy
o Menopause Policy
o Mental Health and Wellbeing Policy
o Recruitment and Selection Policy
o Sexual Harassment Policy
o Transgender Equality Policy
• The Council is also Equally Safe accredited (Bronze). 
3.10 Areas for improvement  
Workforce is a key enabler for change and is a significant area of focus
in the Council’s Transformation Blueprint (agreed in 2022). Under
Theme 2 – 21st Century Workforce, a range of areas are being
progressed to strengthen the capacity of the workforce, address
recruitment and retention challenges and ensure that Midlothian
Council is an ‘Employer of Choice’. 
The principles of Fair Work ensure that all employees are treated fairly,
free from inequality and that the Council advances opportunities for all. 
Areas of focus under the Blueprint Transformation include:
• Investment in development for employees at all levels of the
organisation, including specific development programmes for
managers and leaders
• Further investment in apprenticeships, building on the success
of the Foundation and Modern Apprenticeship programmes lead
by Communities, Lifelong Learning and Employability,
particularly with increased adoption of Graduate Apprenticeship
Page 112 of 126

Page 113

9 
opportunities that tackle sectors where recruitment is more
challenging.
• Long term staff engagement programme to ensure that every
employee’s voice is heard
• Launch of a new Equalities programme linked to recruitment,
gender pay gap, race pay gap and ensuring that the workforce is
more diverse and representative of the communities that we
serve
• Review of overtime, casual workers, agency and fixed term
contracts to ensure services have clear, sustainable workforce
plans linked to service delivery
• Review of HR policies to ensure that all policies have Fair Work
principles embedded and that they are cognisant of the needs of
the organisation 
The Council’s new Workforce Strategy will include the above points
and other areas as identified through the development of the strategy.
This will be supported by a clear delivery plan, linked to Theme 2 – 21st
Century Workforce. It is anticipated that the new Workforce Strategy
will be in draft form in Autumn for consideration and adoption. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
There are no additional resource requirements for developing the
Workforce Strategy and the Fair Work First elements that are currently
implemented. All new initiatives as part of the delivery plan will be
costed accordingly and resourced (where required). 
4.2 Digital 
No digital impacts. 
4.3 Risk 
Workforce is highlighted as a risk in the Council’s Strategic Risk Profile
and reported quarterly to Audit Committee. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
No Integrated Impact Assessment required at this stage however as
new initiatives are designed; appropriate equalities impact
assessments will be carried out. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices
Appendix A – Additional Report Implications
Page 113 of 126

Page 114

10 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
Not applicable 
A.5 Involving Communities and Other Stakeholders 
Not applicable 
A.6 Impact on Performance and Outcomes 
Not applicable 
A.7 Adopting a Preventative Approach 
Not applicable 
A.8 Supporting Sustainable Development 
Not applicable 
Page 114 of 126

Page 115

Midlothian Council
27 August 2024
Item No 8.8 
Housing Programme Update 2024 
Report by Kevin Anderson, Executive Director - Place 
Report for Noting 
1 Recommendations 
1.1 It is recommended that Council notes the contents of this report. 
2 Purpose of Report 
2.1 In approval of the Midlothian Housing Allocation Policy review by
Council in March 2024, elected members requested that further
information is provided in relation to the viability of the Housing
Revenue Account (HRA) in the long term. 
On 21st Feb 2023 Council approved the Rent Setting Strategy for
Midlothian Council 2022/23-2025/26. The rent strategy beyond 2026/27
will be reviewed next year and will consider the continuing investment
in the Council’s existing housing stock as well as a significant
programme of refurbishment, while also determining any level of new
build investment beyond the Council’s current social housing
programme commitment. 
Date: 6 August 2024
Report Contact:
Name : Kevin Anderson, Executive Director, Place 
Tel No : 0131 271 3102
kevin.anderson@midlothian.gov.uk 
Page 115 of 126

Page 116

2 
3 Background 
There are various barriers to the ongoing delivery of affordable housing, such
as access to suitable land to develop with the necessary infrastructure and
while appreciating that the pressure on budgets across national and local
government levels is severe, investment in housing allows councils to meet
some housing needs in their areas, and can also evidence wider positive
benefits to tenants, local communities, and the economy. 
The uncertainty In funding arrangements at national levels is affecting
councils’ and RSLs‘ ability to plan future developments and may result in a
slowdown in the planning and supply of affordable housing. 
Scottish Government housebuilding statistics published at the end of June
2024 reveal a picture of housebuilding decline across Scotland. In 2023-24
private sector completions were down by 13% and site starts were down 16%
on the previous year. New build completions are the second lowest since
2017-18, with the lowest being in 2020-21 when Covid restrictions impacted
housebuilding. Starts were also at the lowest point since 2014-15. 
Statistics for the social housing sector in 2023-24 reveal that building
completions were down 27% and starts down by 14% than the previous
financial year. Completions were the lowest since 2020-21 and starts the
lowest since 2012-13. The number of homes being constructed in Scotland
across all tenures is in decline and is combined with reduced industry capacity
to deliver new homes in the future. 
4 Affordable Housing Funding 
On the 15th of May 2024, the Scottish Parliament declared that Scotland is
experiencing a housing emergency, recognising the significance of the
challenge that exists. 
The consequences of exceptional growth in Midlothian, combined with high
inflation, labour shortages, supply chain disruption and a cost of living crisis is
causing unprecedented pressure on the existing housing stock and potential
for future affordable housing delivery. 
At the beginning of this calendar year the Scottish Government announced a
budget cut of around £200m from the national affordable housing programme
budget, which experienced around a 24% cut to the local authority’s
affordable housing programme budget/Resource Planning Assumptions
(RPAs). 
At the end of April 2024, the Scottish Government announced an allocation of
£80m over two years to enable Councils to acquire properties and bring them
into use for affordable housing and help reduce homelessness. 
Page 116 of 126

Page 117

3 
At the time of writing there has been no detail from Scottish Government on
how this funding can utilised by Local Authorities, which has implications as
affordable housing approvals will be down for future years and completions
across affordable housing and housing of all tenures will also be reduced. 
Housing Revenue Account Financial Model 
For many years the Council have operated a 15 year rolling financial model
which has provided the strategic financial backdrop to capital investment and
rent levels. The model is refreshed on an annual basis, or more regularly if
there are materially changing circumstances. 
Financial projections are based on a combination of known events (eg agreed
rent increase) and modelling assumptions. The main assumptions are:
• Inflationary increases using published statistics.
• Rental income streams based on agreed or estimated increase in
annual rents. Currently a rental increase of 4.8% to the end of financial
year 2025/26 is approved with a planning assumption of 4.5%
thereafter to 2031/32 and 1.7% thereafter.
• Borrowing costs from capital expenditure incurred or approved through
to the end of phase 5 of the new build programme with continuing
investment to meet Scottish Housing Quality Standards (SHQS)
• Rent levels for new build properties will converge with those for existing
stock 15 years from handover.
• External funding via Scottish Government schemes. 
The model forecasts a gradually eroding HRA reserve from its current
projected balance of £35 million in 2024/25 to £2 million in 2039/40. 
5 Affordable Housing Delivery 
The level of future years Affordable Housing Supply Programme budget is still
to be determined by Scottish Government resulting in an element of risk that
the Phase 5 New Social Housing Programme in Midlothian will become
unaffordable unless future rents are increased to support the investment. This
risk has been somewhat negated by the recent announcement that projects
can now be approved from future years budgets at a rate of 80% for 2025/26,
60% for 2026/27 and 40% from 2027/28 which helps to remove some degree
of uncertainty and risk with regard to future funding for New Social Housing,
although there will be some element of forward funding required for some of
our housing sites in scope for Phase 5. 
Financial modelling suggests the HRA can support forward funding for Phase
5 of New Social Housing project to 2027/28 (see Table 2). 
There is currently no budget available within the 2024/25 Scottish
Government’s Affordable Housing Supply Programme to subsidise the open
market purchases in 2024/25, however there has been announcement by
Scottish Government that there is potentially a fund of £40 million being made
Page 117 of 126

Page 118

4 
available which can be used to subsidise open market purchases, hopefully
resulting in receipt of some level of funding during 2024/25, although the level
and criteria for spending this is still to be announced. 
The Housing Revenue Account can sustain a small number of
purchases (approximately 6 units) during 2024/25 should no funding be
received, or can access future year open market purchase budgets
in the HRA should a good value opportunity arise. 
During recent times the construction industry in Scotland and the UK has
experienced unprecedented adverse market conditions, which has led to
significant rises in tender prices for a wide range of materials. There is
evidence that inflation of between 10% and 15% beyond BCIS predictions is
affecting projects and whilst measures such as value engineering are partially
mitigating cost increases, there is a risk that the capital budgets provided for
delivery of the New Social Housing project will need to be increased with a
resultant impact on the funding strategy. 
Strategic Local Programme Agreement 2024/25 
The Strategic Local Programme Agreement (SLPA) for this Financial Year
reflects the 26% reduction in funding that has been applied across all local
authorities. This has resulted in a resource planning assumption (total grant
assumption) for Midlothian of £7.998m for 2024/25. This contrasts with the
2023/24 SLPA of £10.534m. 
The reduction in grant affects both the Council’s own housing programme and
that of our partners such as Registered Social Landlords. 
Table 1
Sites that will draw down on Scottish Government funding this year 
Site Developer Number Tenure ASHP
Grant
Funding
Bonnyrigg One Dalhousie -
(P47487)
MLC 3 SR 0.301
Gorebridge Newbyres
Crescent - T34262
MLC 72 SR 1.928
Mayfield Easthouses Road
(Former Newbattle High School
Site) (MLC) - P42523
MLC 90 SR 5.109
Total    £7.338m 
As noted above, there is no grant available for Off Market Purchases due to
the level of committed projects already receiving funding. 
Page 118 of 126

Page 119

5 
There remains £0.660m to be allocated to capital projects through the AHSP
in this financial year. 
The SLPA also confirms that sites to be approved for funding in 2024/25 (with
funding to be drawn down in 2025/26) include: 
• Bonnyrigg Polton St (Complex Care)
• Danderhall Newton Church Road (Leisure Centre)
• Mayfield Easthouses Road (Melville Housing Association)
• Auchendinny Phase 1 (Wheatley Group
Phase 5 Funding 
Following the cut to funding, a review of Midlothian Council’s Phase 5 sites
was undertaken. As a result, some sites were deferred or removed from the
Council’s programme, with a focus on Section 75 sites, where sites delivering
private housing by the private sector are required to deliver 25% of units as
affordable. The revised Phase 5 is shown below. The uncertainty around
future funding remains, therefore this phase is liable to change over time. 
In addition to Phase 5 funding, there is also currently £20m budgeted for
Housing Led Town Centre Regeneration work. Feasibility work is currently
underway to establish the means of delivering the first phase of this in
Dalkeith Town Centre. 
Page 119 of 126

Page 120

Table 2 
Phase 5 Sites Review – Outcome  
Site Units Y/N/D Rationale
Site 148 - Newton Church Road Leisure Centre 23 Yes Smaller site, Council owned. 
Grant approval confirmed in SLPA 24/25
Site 155 - Muir Homes Crichton Road 11 Yes Grant Allocated and fully drawn down.
Site 142 - Stewart Milne (Shawfair) 
(in administration) 
28 Yes Acquisition cost allocated but full grant outstanding. 
Forward funding until grant allocated. 
Site 153 - Newtongrange Church Hall 6 Yes Not on site, however grant allocated in form of site acquisition.
Low value grant outstanding, which can be forward funded. 
Edmonstone Road, Danderhall (Bellway AA2/AA3)   34 Yes Will forward fund. 
Is a priority for securing grant funding with SG in future years. 
Regional Delivery Alliance sites 9 Yes Forward funding due to small size / unit numbers. 
Shawfair (Lovell) – HARP Ref P43738  38 Yes MLC has made taking this site forward conditional on timing in
26/27 to ensure affordability to HRA. 
The Brae Auchendinny (Bellway) 55 Defer –
review
required.
Grant approval 25/26, subsidy available 26/27. 
In discussion on phasing / timing of delivery with developer. 
Newtongrange (swimming pool site and Top Club)
HARP Ref P47183 
20 Defer –
review
required
No grant allocation approved, will require forward funding.
Affordability to be reviewed once costs ascertained. 
Certainty around 26/27 funding needed.
Rullion Road HARP Ref P46386  48 Defer –
review
required
No grant allocation approved, will require forward funding.
Affordability to be reviewed once costs ascertained. 
Certainty around 26/27 funding needed.
Page 120 of 126

Page 121

7 
Area C, Newton Farm / Wellington Farm   25 Defer –
review
required
Timing of housing delivery to be confirmed. No grant allocation
approved. Affordability to be reviewed once costs ascertained.
Certainty around 26/27 funding needed.
Site 128 Shawfair , Old Craighall Road,
MacTaggart & Mickel P41836 
48 No MLC no longer seeking to take this site forward. 
Site 149 – Barratt Danderhall  (Block R – HARP
ref P42532)
33 No MLC no longer seeking to take this site forward. 
Lingerwood Springfield NA NA Timing of delivery of this site not known. 
MLC not currently seeking to take this site forward. 
Page 121 of 126

Page 122

Ongoing Delivery 
While the cut to the affordable housing delivery programme has resulted in
Midlothian Council withdrawing its interest in sites coming forward or deferring
delivery, sites with an existing commitment continue to deliver new, high quality
homes to those in housing need. Between August 2023 to August 2024, the
Council has built and handed over 388 new homes from 10 sites detailed in
table below.
Page 122 of 126

Page 123

Site Name
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
Apr-23
May-23
Jun-23
Jul-23
Aug-23
Sep-23
Oct-23
Nov-23
Dec-23
Jan-24
Feb-24
Mar-24
Apr-24
May-24
Jun-24
Jul-24 Totals
Newmills Road, Dalkeith               42          42
Dalhousie Mains, Bonnyrigg 25 19 9 17                     70
Morris Road, Newtongrange     19 60                   79
Conifer Road, Mayfield                   0 24 0 18 30  72
Hopefield Yard, Bonnyrigg             16            16
High Street, Bonnyrigg                        20 20
Burnbrae, Hopefield              10  10         20
Wester Cowden, Dalkeith
(Remaining)                         6
Barratt Homes, Moat View, Roslin           21     9 23        53
Buccleuch Street, Dalkeith                  6   4    10                         
0
Total Handovers August 2023 to
August 2024 25 19 9 17 19 60 0 0 0 0 21 0 16 10 42 19 23 6 0 24 4 18 30 20 388
Page 123 of 126

Page 124

Energy Efficiency Standard for Social Housing (EESSH2) 
In addition, the programme of upgrades to the Council’s existing housing
stock to enhance energy efficiency has advanced. In 2023/24, 118 Council
homes had energy efficiency measures implemented, with a focus on external
wall insulation and window and door replacement on homes in Danderhall
where there us a high incidence of poor energy efficiency in homes and fuel
poverty. This investment is supported by the Scottish Government’s Social
Housing Net Zero Heat Fund (SHNZHF).
In addition, a further 55 private homes were upgraded, with all associated
costs covered by the Scottish Government’s Area Based Scheme (ABS) grant
and owner contributions. This is used to facilitate the upgrade of private
properties that are in or at risk of fuel poverty. This also used where there are
mixed tenure blocks and owners meet the funding criteria. 
In total, Midlothian Council spent £1.172m on energy efficiency measures
through our EESSH2 programme and received £0.488m in grant. It also spent
£0.705m on area based scheme measures on homes in private ownership.
Total spend was £1.1876m and total grants received was £1.193m.
The programme will continue to grow in 2024/25 with an additional 182
Council homes and 46 homes in private ownership to be upgraded with further
grant support valued at £0.705m (ABS) and £0.825m (SHNZHF). 
6 Report Implications (Resource, Digital and Risk) 
6.1 Resource
There are no resource implications arising directly from this report. 
6.2 Digital 
Not applicable 
6.3 Risk
There is regular review of risk to ensure the retained risk in the new
house building programme is of an acceptable and tolerable level to
maximise opportunities and have full consideration of risk implications
in achieving our aims and objectives 
6.4 Ensuring Equalities (if required a separate IIA must be completed)
Equality is central to all housing and housing services delivery. An
Integrated Impact Assessment (IIA) has been undertaken on the Local
Housing Strategy 2021-26 to ensure that the needs of local
communities have been fully considered. The SHIP reflects identified
needs and draws on findings from the IIA when considering the
implications flowing from the translation of strategic aims into housing
policies. 
6.5 Additional Report Implications (See Appendix A) 
See Appendix A 
Page 124 of 126

Page 125

11 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan
Affordable housing, homelessness and health and social care
outcomes through the provision of specialist housing. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value
We manage all aspects of our business so that tenants and other
customers receive services that provide value for money in the rent and
other charges they pay. 
A.5 Involving Communities and Other Stakeholders
A full consultation in the current Rent Setting Strategy 2023/24-2025/26
and the Housing Allocation Policy 2024 was available to Midlothian
Council tenants and waiting list applicants. Stakeholders are informed
of outcomes at the regular Local Housing Strategy Forum meetings.
A.6 Impact on Performance and Outcomes
Not applicable 
A.7 Adopting a Preventative Approach
Not applicable 
A.8 Supporting Sustainable Development 
Good practice in relation to energy efficiency and sustainability is
contained in the SHIP and Local Housing Strategy 2021/22 – 2025/26. 
Page 125 of 126

Page 126

Page 126 of 126