Democracy Spraffa

Agenda Document Pack - Midlothian Council - 07/05/2024

Midlothian Council · 7 May 2024
Back to Midlothian Council — 7 May 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Notice of Meeting and Agenda 
Midlothian Council 
Venue:  Council Chambers/Hybrid, 
Midlothian House, Dalkeith, EH22 1DN 
Date:  Tuesday, 07 May 2024 
Time:  11:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone: 
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.Midlothian.gov.uk 
Page 1 of 238

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
4          Deputations 
No items for discussion 
5          Minutes
5.1 Minute of Special Council of 26 March 2024, submitted for approval 5 - 8
5.2 Minute of Midlothian Council 26 March 2024, submitted for approval 9 - 22
5.3 Minute Volume Index 23 - 24
5.4 Action Log 25 - 28 
6          Questions to the Council Leader 
No items for discussion 
7          Motions
7.1 Jo Cox Civility Commission 29 - 30 
8          Public Reports
8.1 School Session Dates 2025-2027, report by Executive Director
Children, Young People and Partnerships
31 - 38
8.2 Standing Orders Working Group – Progress Report, report by
Executive Director Place
39 - 50
8.3 Education Appeals Committee – update to membership, report by
Executive Director Place
51 - 56
8.4 Joint Consultative Group – update to membership, report by
Executive Director Place
57 - 60
Page 2 of 238

Page 3

8.5 Edinburgh, the Lothians and Scottish Borders MAPPA Annual
Report for 2022/23, report by Head of Adult Services & Deputy
Chief Social Work Officer
61 - 112
8.6 Local Heat and Energy Efficiency Strategy, report by Executive
Director Place
113 - 192
8.7 British Sign Language Plan, report by Executive Director Place 193 - 212
8.8 Capital Plan Prioritisation, report by Executive Director Place 213 - 222
8.9 Second Review of Scottish Parliamentary Boundaries, report by
Legal and Governance Manager
223 - 232
8.10 Glyphosate, report by Executive Director Place 233 - 238 
9          Private Reports 
Exclusion of Members of the Public
(A) TO CONSIDER RESOLVING TO DEAL WITH THE UNDERNOTED
BUSINESS IN PRIVATE IN TERMS OF PARAGRAPHS 6, 9 AND 11 OF PART
1 OF SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT 1973
- THE RELEVANT REPORTS ARE THEREFORE NOT FOR PUBLICATION;
AND
(B) TO NOTE THAT NOTWITHSTANDING ANY SUCH RESOLUTION,
INFORMATION MAY STILL REQUIRE TO BE RELEASED UNDER THE
FREEDOM OF INFORMATION (SCOTLAND) ACT 2002 OR THE
ENVIRONMENTAL INFORMATION REGULATIONS 2004. 
9.1 Midlothian Public Electric Vehicle Charging Strategy and
Procurement, report by Executive Director Place 
10    Date of Next Meeting 
The next meeting will be held on Tuesday, 25 June 2024 at 11am 
Page 3 of 238

Page 4

Page 4 of 238

Page 5

Minute of Meeting 
Midlothian Council
Tuesday, 7 May 2024
Item No 5.1 
Special Meeting of Midlothian Council 
Date Time Venue
26 March 2024 10.30 am Council Chambers, Midlothian
House, Dalkeith/Microsoft Teams 
Present: 
Provost McCall (Chair) Councillor Bowen (Depute Provost)
Councillor Parry (Council Leader) Councillor Cassidy (Depute Leader)
Councillor Alexander Councillor Bowen
Councillor Curran Councillor Drummond
Councillor Imrie Councillor McEwan
Councillor McKenzie Councillor Milligan
Councillor Pottinger Councillor Russell
Councillor Scott Councillor Smaill
Councillor Virgo Councillor Winchester   
In attendance: 
Dr Grace Vickers, Chief Executive  Kevin Anderson, Executive Director Place
Michelle Strong, Education Chief
Operating Officer
Morag Barrow, Joint Director Health and
Social Care
Alan Turpie, Legal and Governance
Manager / Monitoring Officer
David Gladwin, Chief Financial Officer
(Section 95 Officer)
Saty Kaur, Chief Officer Corporate
Solutions
Anne-Theresa Lawrie, Religious
Representative
Janet Ritchie, Democratic Services
Officer
Lucy Roddie, Democratic Services Officer 
Hannah Forbes, Assistant Democratic
Services Officer 
Page 5 of 238

Page 6

1.   Welcome and Apology for Absence 
The Provost welcomed everyone to the meeting, advising that this meeting was
a public meeting and would be webcast live to the internet. 
2.  Order of Business 
As per the agenda previously circulated 
3.  Declarations of interest  
None received.  
4.  Deputations 
No items for discussion. 
5.  Minutes of Previous Meetings 
No items for discussion. 
6.  Question to the Leader of the Council 
No items for discussion. 
7.  Notices of Motion 
No items for discussion. 
8.  Reports 
Report No. Report Title Report by:
8.1 Review of the Scheme for the
Establishment of Community
Councils
Report by Fiona Robertson,
Executive Director Children,
Young People & Partnerships
Outline of report and summary of discussion
The purpose of this report was to approve a public consultation on a revision of the
Midlothian Scheme for the Establishment of Community Councils. This is required
to reflect changes in policy since 2014 and to update the Scheme to reflect the
amended Model Scheme for Community Councils. 
Councillor Smaill declared that their wife was a member of the community council
and the Legal and Governance Manager/Monitoring Officer confirmed that as this
report covers all community councils a declaration of interest is not required. 
Page 6 of 238

Page 7

The Education Chief Operating Officer presented this paper on behalf of Executive
Director Children, Young People & Partnerships. The Education Chief Operating
Officer provided a brief overview of the report and highlighted the significant
changes that have taken place since 2014. 
The Education Chief Operating Officer advised that the initial draft will be
circulated for consideration by the Community Councils, third sector groups and
stakeholders and that any feedback will inform amendments and any amendments
will require further consultation prior to approval. 
Councillor Parry commented positively on the report, stating they looked forward to
the feedback from community councils and took the opportunity to express thanks
to all community councils for the hard work given to communities.   
Councillor Parry, seconded by Councillor Scott moved the report. 
The Legal and Governance Manager/Monitoring Officer advised that under Section
53 of the Local Scotland Act a Special meeting of Council requires two thirds of the
committee to approve – the Council unanimously approved the report. 
Decision
The Council unanimously approved an 8-week public consultation on the revised
Scheme for the Establishment of Community Council 
The meeting concluded at 10.36am.
Page 7 of 238

Page 8

Page 8 of 238

Page 9

Minute of Meeting 
Midlothian Council
Tuesday, 7 May 2024
Item No 5.2 
Midlothian Council 
Date Time Venue
Tuesday 26 March 2024 11:00 am Council Chambers, Midlothian
House/Hybrid 
Present:
Provost McCall (Chair) Depute Provost Bowen
Councillor Parry (Council Leader) Councillor Cassidy (Depute Council Leader)
Councillor Alexander Councillor Curran
Councillor Drummond Councillor Imrie
Councillor McEwan Councillor McKenzie
Councillor McManus Councillor Milligan
Councillor Pottinger Councillor Russell
Councillor Scott  Councillor Smaill
Councillor Virgo Councillor Winchester 
Religious Representatives:
Anne-Theresa Lawrie 
In attendance:
Dr Grace Vickers, Chief Executive  Kevin Anderson, Executive Director Place
Morag Barrow, Director of Health &
Social Care: Midlothian HSCP /
Chief Officer to Midlothian IJB
Michelle Strong, Education Chief Operating
Officer
Alan Turpie, Legal and Governance
Manager / Monitoring Officer
David Gladwin, Chief Financial Officer
(Section 95 Officer)
Derek Oliver, Chief Officer Place Saty Kaur, Chief Officer Corporate Solutions 
Page 9 of 238

Page 10

Lucy Roddie, Democratic Services
Officer
Hannah Forbes, Assistant Democratic
Services Officer
Janet Ritchie, Democratic Services
Officer
Fiona Clandillon, Head of Development
1.   Welcome and Apology for Absence 
The Provost welcomed everyone to this meeting of the Midlothian Council and
advised that the meeting was open to the public and would be webcast live. 
The Provost advised Council of the death of former Councillor David Fletcher 
and his wife Susan. A minute silence was observed. 
The Provost welcomed Cal Haston, Scottish Youth Parliament member for 
Midlothian North and Musselburgh, who would be observing today’s meeting. 
The Provost gave congratulations to Jasmin Paris who had recently became the 
first woman to complete the Barkley Marathons race in Tennessee. Jasmin lives 
and works in Midlothian. 
2.  Order of Business 
The order of business was as per the agenda previously circulated. 
3.  Declarations of interest   
Councillor McEwan gave a declaration of transparency in relation to Item 8.2.
4.  Deputations 
None received. 
5.  Minutes of Previous Meetings 
Item No. Report Title Submitted by:
5.1 Minute of Meeting of Midlothian Council
27 February 2024
Executive Director Place
Outline and Summary of Discussion 
The Minute of Meeting and Private Addendum of Midlothian Council held on 27
February 2024 was submitted for approval. 
It was noted that Councillor Smaill’s apologies for the meeting had not been
recorded in the minute. 
The minute was approved, subject to the above amendment. Councillor Parry
moved. Councillor Cassidy seconded.
Decision
Minute of Meeting and Private Addendum of Midlothian Council held on 27 February
2024 was approved.
Page 10 of 238

Page 11

Action
Democratic Services to amend minute for accuracy. 
Item No. Report Title Submitted by:
5.2 Minute Volume Index  Executive Director Place
Outline and Summary of Discussion 
The following minutes were previously circulated to Elected Members and
subsequently noted and/or the recommendations contained therein approved:
• Minute of Community Asset Transfer Committee of 30 January 2024
• Minute of Appeal Hearing of 6 September 2023
• Minute of Cabinet of 28 November 2023
• Minute of Planning Committee of 28 November 2023
• Minute of Planning Committee of 23 January 2024
• Minute of MIJB Audit and Risk Committee of 7 December 2023
• Note of Seminar of 23 January 2024
Moved by Councillor Parry. Seconded by Councillor Cassidy.
Decision
Minute Volume Index noted.
Action
Democratic Services 
Item No. Report Title Submitted by:
5.3 Action Log Executive Director Place
Outline and Summary of Discussion
It was requested that Action 1 – Capital Plan Prioritisation remain open.
Decision
The Action Log was noted, with all actions recommended for closure to be closed
except Action 1 which remains open.
Action
Democratic Services 
6.  Questions to the Leader of the Council 
None received. 
7.  Motions 
Page 11 of 238

Page 12

Item No. Notice of Motion Submitted by:
7.1 Month of the Military Child Councillor Winchester and
Councillor Virgo 
Outline and Summary of Discussion
It was noted that there was an error - the Motion should read Dandelion is the flower
not Daffodil.
The Notice of Motion was proposed by Councillor Winchester and seconded by
Councillor Virgo.
Decision
The Notice of Motion was moved.
Action
Executive Director Place 
8.  Reports 
Report No. Report Title Submitted by:
8.1 Intake Figures and Limits for Primary
and Secondary Schools Session
2024/25
Executive Director Children,
Young People and
Partnerships
Outline and Summary of Discussion
The report provides Council with an update on the enrolment of pupils and intake for
the school session 2024/25. The report identifies a number of schools where there
is pressure on school capacity, and the need for intake limits to safeguard places for
catchment children and to manage placing requests.
Council is requested to approve the requirement to apply intake limits, as detailed
in the report, at a number of schools in order to safeguard places for pupils to be
able to attend their catchment school. Council is requested to note the estimated
intake figures for primary and secondary schools. 
The Education Chief Operating Officer responded to questions from elected
members in relation to class capacities. Scottish Government sets maximum class
sizes but the physical size of the classroom restricts the number of learners that can
be accommodated. The Executive Business Manager, Children, Young People &
Partnerships reported that there may be instances in which the maximum class size
is exceeded. For example, team teaching may be implemented for larger rooms with
a maximum of 30 pupils under 2 teachers. The calculation of class sizes remains
dynamic depending on the number of children that need to be accommodated. In
responding to a question from an elected member, the Executive Business
Manager, Children, Young People & Partnerships reported that the Council has a
statutory obligation to provide an early years place to all children within Midlothian,
but there is no obligation to attach the place to a specific school or locality, which
provides flexibility for parents. The Council maintains close contact with funded
providers to ensure adequate places and continually works with funded partners to
explore opportunities to extend partnerships.
Page 12 of 238

Page 13

Councillor Scott moved. Seconded by Councillor Milligan. 
Decision
Council:
a) approved the requirement to apply intake limits, as detailed in the report, at
a number of schools in order to safeguard places for pupils to be able to
attend their catchment school. 
b) noted the estimated intake figures for primary and secondary schools.
Action
Executive Director Children, Young People and Partnerships 
Report No. Report Title Submitted by:
8.2 Large Grants 2025/28 Executive Director Place
Outline and Summary of Discussion 
The Chief Officer Corporate Solutions presented the report. The report provides an
update on the current programme and options for the next round of large grants
funding 2025/28. 
Council is recommended to:
a) Note the issues highlighted and proposed actions set out at 3.4-3.8.
b) Note the establishment of a Short Life Working Group to progress options
for the grant funding programme.
c) Approve option 4 within 3.14 as recommended by Business Transformation
Steering Group. 
The Chief Officer Corporate Solutions assured elected members that the Short Life
Working Group would report into the Business Transformation Steering Group to
ensure elected member visibility and opportunity to contribute to these discussions. 
In responding to a question from an elected member in relation to group membership
and governance, the Chief Officer Corporate Solutions reported that the Short Life
Working Group would be reviewing the strategic approach more broadly as opposed
to reviewing specific grants or organisations. The terms of reference would make
clear the requirement to declare conflicts of interest and transparency. 
Councillor Parry moved. Councillor Scott seconded.
Decision
Council:
a) Noted the issues highlighted and proposed actions set out at 3.4-3.8.
b) Noted the establishment of a Short Life Working Group to progress options
for the grant funding programme.
Page 13 of 238

Page 14

c) Approved option 4 within 3.14 as recommended by Business Transformation
Steering Group.
Action
Executive Director Place
Report No. Report Title Submitted by:
8.3 Midlothian Council Housing Allocation
Policy Review 2023/24
Executive Director Place
Outline and Summary of Discussion 
The Executive Director Place presented the report.  It is recommended that Council
approves the outcome results of the Housing Allocation Policy Review consultation
with all Midlothian Council tenants, waiting list applicants, stakeholders and tenant
groups during the Winter 2023 period as listed in Section 6 of the report. 
Some discussion took place in relation to consultation methods. An elected member
commented that the majority of respondents completed the survey online, noting the
existence of bias in this regard. Assurances were sought that other methods of
response were available. The Executive Director Place reported that while the
Council has adopted a digital by default position, the potential for exclusion of certain
populations is recognised in this regard and the Council ensures that other
opportunities for engagement are available through community settings (e.g.
libraries) and that hard copy materials are available. 
An elected member noted that 59% of respondents disagreed with the percentage
split for allocation of housing to the homeless and queried if the percentage split
would be reviewed. The Executive Director Place commented that the Council aligns
to the regulator recommendation and there were no plans to change this. 
In response to a request from an elected member, the Executive Director Place
agreed to consider increasing the financial incentive for downsizing. 
The Executive Director Place provided further information in relation to Scottish
Government financial support for housebuilding and reported that the Scottish
Government target has not changed, however there will be a reduction in the subsidy
level for the affordable housing programme for Midlothian which will impact the
delivery of social housing. 
In response to a request from an elected member, the Executive Director Place
agreed to provide further information in relation to the viability of the Housing
Revenue Account in the long term, however noted that this would not be available
until final accounts from some developments had been received. 
In responding to a question from an elected member, the Executive Director Place
reported that the Council were endeavouring to provide an online tenant portal. 
In responding to a question from an elected member in relation to the allocation of
30 points for notice to quit, the Executive Director Place noted that this was
benchmarked against neighbouring Local Authorities. The Executive Director Place
reported that the impact of this particular allocation of points would be included in a
subsequent review.
Page 14 of 238

Page 15

In response to a request from an elected member, the Executive Director Place
agreed to consider providing physical assistance for moving as an incentive for
tenants to downsize. 
In response to a request from an elected member, the Executive Director Place
agreed to an audit of housing allocations. 
In response to a request from an elected member, the Executive Director Place
agreed to arrange a briefing on tenancy agreements. 
Some discussion took place in relation to the buyback programme with the Executive
Director Place confirming that this was still in existence with budget available within
the Housing Revenue Account. 
Elected members noted that the response rate had been poor and the Executive
Director Place reported that the intention was to align the next housing allocation
policy survey with the rent strategy survey, where response rates are usually much
higher. 
In response to a request from an elected member, the Executive Director Place
agreed to review benefit in kind. 
In responding to an elected member about property sizes and whether it would be
possible to extend existing properties, the Executive Director Place reported that the
housing and development teams were reviewing the provision of larger size housing
and commented that it is not standard practice to extend existing properties, except
in exceptional cases where bidders have mobility issues or disabilities which require
alterations. 
Councillor McKenzie moved the paper. 
Councillor Curran moved an amendment to the motion in relation to Section 6 of
the report, namely, that the Tier system is retained, removing the recommendation
below: 
Local Letting Initiative for New Builds
(a) It is recommended to prioritise Midlothian Council tenants, and merge Tiers 1
and 2, supported by 75%.
(b) Housing Associations applicants to remain in Tier 3, according to 65% of
respondents. 
Councillor McKenzie agreed to Councillor Curran’s amendment. 
The motion as amended was moved by Councillor McKenzie. Seconded by
Councillor Curran. 
Decision
Council approved the outcome results of the Housing Allocation Policy Review
consultation with all Midlothian Council tenants, waiting list applicants, stakeholders
and tenant groups during the Winter 2023 period as listed in Section 6 of the report,
subject to the removal of the following recommendation:
Page 15 of 238

Page 16

Local Letting Initiative for New Builds 
(a)  It is recommended to prioritise Midlothian Council tenants, and merge Tiers
1 and 2, supported by 75%.
(b)  Housing Associations applicants to remain in Tier 3, according to 65% of
respondents.
Action
Executive Director Place 
Report No. Report Title Submitted by:
8.4 Midlothian Council Mixed Tenure
Strategy
Executive Director Place
Outline and Summary of Discussion 
The Head of Development presented the report and noted the recommendations as
outlined in Section 1. 
The strategy aims to address rising pressure on the Council's waiting list from those
in housing need and pressures on funding on the affordable housing supply
programme, while meeting the housing supply target for alternative tenures of
affordable homes. It does this by encouraging more diversity in the kinds of
affordable homes available in Midlothian, particularly in relation to discounted homes
for sale, and the expansion of homes available for mid-market rent.
Elected Members noted the chronic shortage of housing across Midlothian and
welcomed the paper as a means of addressing this.
In responding to a question, the Head of Development provided further information
in relation to the golden share. When a home comes up for resale, it reverts back to
the council for appraisal in terms of its value, therefore the discount is maintained
through every transaction.
In responding to a question, the Head of Development and Executive Director Place
provided further information in relation to housing allocation policy. The Council
shares a common housing register with Melville Housing Association and that the
percentage allocations vary, but new build nomination agreements are generally
50%. 
Several Elected Members commented on the importance of ensuring that new
housing is made available to those already resident in Midlothian. In relation to
guaranteeing the allocation to Midlothian residents, the Head of Development
commented that partnership agreements would set out the parameters and criteria
in terms of the allocation of mid-market rent. The Council would seek to include the
prioritisation of housing for Midlothian residents. These agreements would be legally
enforceable. 
Page 16 of 238

Page 17

In responding to a question, the Head of Development provided further information
on property costs. The Council would seek to apply a cap to the value, which would
need to be proportionate to the type and size of home being acquired. 
In responding to a question regarding build rates, the Head of Development referred
to the rent setting strategy that was approved at Council which detailed the level of
investment capacity to forward fund homes.  It was noted that this was based on the
assumption that grants would be available to co-fund homes. 
In responding to a question regarding arms length organisations (ALEOs), the Head
of Development agreed to arrange a briefing for Elected Members to provide further
information in this regard once the Council has moved forward with the first
development. 
Councillor McKenzie moved. Councillor Parry seconded.
Decision
Council:
i.  Noted the continued and rising demand for affordable homes in Midlothian
and the disparity between the cost of buying and renting privately and the
rents available through homes made available for social rent.
ii.  Supported the active promotion of a range of mixed tenures in meeting the
need for affordable homes in order to provide more choices to those in
housing need and reduce demand for social housing on Midlothian
Council’s waiting list.
iii.  Approved a range of affordable ownership tenures to be delivered by
Registered Social Landlords (RSLs – Housing Associations) and Midlothian
Council through Golden Share.
iv.  Noted that opportunities for homes to be built and sold through New
Supplied Shared Equity scheme by Midlothian Council will be considered in
future developments.
v.  Approved the delivery of Mid-Market Rent by Midlothian Council through
partnerships with RSLs that will ensure preference is given to Midlothian
residents who are in housing need.
vi.  Noted that further investigation of opportunities to directly deliver Mid-
Market Rent will be undertaken where this will leverage in alternative
sources of finance, e.g. through lease-based models, in order to mitigate
impact on the General Fund.
vii.  Noted that any proposals to directly deliver Mid-Market Rent will require the
establishment of an arms length organisation, which will require a further
report to Council for approval.
viii. Approved the alignment of relevant planning policy in the emerging Local
Development Plan on affordable housing with the recommendations of the
Mixed Tenure Strategy, including support for Intermediate Rent in Build to
Rent developments. 
ix. Note that Midlothian Council’s housing options interviews and information on
the Council website will be amended to ensure better awareness of
alternative ownership and rental tenures available for those applying to
Page 17 of 238

Page 18

Midlothian Council’s social housing waiting list, with service training
provided to support this.
x.  On that basis, approved the adoption of the Mixed Tenure Strategy by
Midlothian Council.
Action
Executive Director Place 
Report No. Report Title Submitted by:
8.5 Midlothian Local Transport Strategy
(LTS) – ‘Case for Change’ consultation
Executive Director Place
Outline and Summary of Discussion 
The report informs Council of the policy context guiding the development of a new
Midlothian Local Transport Strategy (LTS) and seeks agreement to commence a
short survey in April. This is needed to help ensure transport problems are fully
identified, and thus conclude the early stages of the LTS development. 
It is recommended that Council:
a) Agrees to a six-week long public survey commencing in April 2024, to help
conclude Stages one and two (referred to as the ‘Case for Change’ stage)
of the Local Transport Strategy (LTS), and
b) Notes that the results of the survey will be used to help finalise the Stages
one and two report and help inform the development of ‘options’ for the final Local
Transport Strategy document, also 
c) Notes that a fuller 12-week long public consultation exercise will be held
over July, August, and September, on the draft final Local Transport Strategy. 
Councillor Cassidy moved. Councillor Virgo seconded. 
Councillor Imrie moved an amendment to the motion, namely, that in relation to
recommendation (a), the 6-week consultation begin after the Easter holiday period
and in relation to recommendation (c) the 12-week consultation period begin after
the summer holiday period. 
Councillor Cassidy and Councillor Virgo agreed to Councillor Imrie’s amendment. 
The motion as amended was moved by Councillor Cassidy. Seconded by Councillor
Virgo.
Decision
Council:
a)  Agreed to a six-week long public survey commencing after the Easter holiday
period, to help conclude Stages one and two (referred to as the ‘Case for
Change’ stage) of the Local Transport Strategy (LTS), and
b)  Noted that the results of the survey will be used to help finalise the Stages
one and two report and help inform the development of ‘options’ for the final
Local Transport Strategy document, also 
Page 18 of 238

Page 19

c)  Noted that a fuller 12-week long public consultation exercise will be held after
the summer holiday period, on the draft final Local Transport Strategy.
Action
Executive Director Place 
Report No. Report Title Submitted by:
8.6 Pavement, Double and Dropped Kerb
Parking Restrictions
Chief Officer, Place
Outline and Summary of Discussion 
The purpose of this report was to update Council on the introduction of new
parking prohibitions for pavement, double and dropped kerb parking. The Parking
Prohibitions (Enforcement and Accounts) (Scotland) Regulations 2023 came into
force on 11 December 2023. 
It was recommended that Council enforce these new Regulations utilising its
decriminalised parking powers with effect from 1st April 2024, prioritising locations
where public safety and accessibility are impacted. There will be a graduated
approach, with a short introductory period to allow the public to adjust to the new
rules. A targeted, awareness campaign will be launched during this period, where
behavioural change will be the focus and compliance with the prohibitions will be
encouraged. 
The Chief Officer Place presented the report, Councillor Alexander moved the
report, seconded by Councillor Virgo. 
A discussion took place regarding parking in streets where the width of the road
restricts traffic if parking on both sides; areas where there are wide pavements and
with cars parked does not impact the movement of pedestrians and areas where
there has always been parking allowed on the grassy areas.  It was also
highlighted that some areas should be assessed, and signs erected if they are
designated parking area(s) and it was also suggested that an informal system with
parking wardens should be implemented with stickers on cars advising not suitable
and illegal. 
The Chief Officer Place noted all the concerns and suggestions raised and
confirmed these would all be taken into consideration.
Decision
Council:
a) Noted inconsiderate and obstructive parking on pavements, footways,
dropped kerbs and double parking causes inconvenience and accessibility
issues; and
Page 19 of 238

Page 20

b) Approved that pavement, footway, double and dropped kerb parking
restrictions, as introduced by The Parking Prohibitions (Enforcement and
Accounts) (Scotland) Regulations 2023, be enforced effective from 1st April
2024. 
Action
Chief Officer Place 
Report No. Report Title Submitted by:
8.7 Covert Surveillance Annual Report Executive Director, Place
Outline and Summary of Discussion 
The purpose of this report is to advise the Council of covert surveillance actions in
terms of the Regulation of Investigatory Powers (Scotland) Act 2000 (“RIPSA”) by
the Council during 2023. 
The Legal and Governance Manager presented the report for noting.
Decision
Council noted the terms of the report.
Action 
Report No. Report Title Submitted by:
8.8 Pre-Election Publicity Guidance Chief Executive
Outline and Summary of Discussion 
The purpose of this report was to update Members of the terms of the Council’s
Pre-Election Publicity Guidance which has previously been approved. This is to
ensure that Council facilities are not used to support any particular political party in
any election, by-election or referendum.
The Chief Executive presented this for noting.
Following concerns raised regarding acceptable photo ID, the Chief Executive
confirmed that communication would be sent out in advance and confirmed that
photo ID was only required when voting in person at polling stations, and there
was no change to postal voting.  
Decision
Council noted the terms of the Council’s Pre-Election Publicity Guidance in
advance of the forthcoming UK Parliamentary General Election. 
Action 
Page 20 of 238

Page 21

The Public section of the meeting concluded at 13:13pm. 
9. Private 
Exclusion of Members of the Public 
In view of the nature of the business to be transacted, the Committee agreed
that the public be excluded from the meeting during discussion of the
undernoted item, as contained in the Addendum hereto, as there might be
disclosed exempt information as defined in paragraphs 3, 6 and 14 of Part I of
Schedule 7A to the Local Government (Scotland) Act 1973:- 
9.1  Review of Cost Implications of Passivhaus versus Standard High Efficiency
Social Housing, report by Executive Director Place 
9.2 Ukraine Longer Term Resettlement Programme, report by Executive Director
Place 
Date of Next Meeting 
The next meeting will be held on Tuesday 7 May 2024 at 11.00am 
The meeting concluded at 14.16pm. 
Page 21 of 238

Page 22

Page 22 of 238

Page 23

Midlothian Council Minute Volume 
Presented to the Meeting
of Midlothian Council
on Tuesday, 07 May 2024 
Page 23 of 238

Page 24

1           Minutes of Meetings submitted for Approval 
2           Minutes of Meetings submitted for Consideration 
Minute of General Purposes Committee of 14 November 2023 3 - 8 
Minute of Performance Review and Scrutiny Committee of 12
December 2023
9 - 20 
Minute of Audit Committee of 29 January 2024 21 - 28 
Minute of Local Review Body of 5 February 2024 29 - 50 
3          Minutes of Meetings submitted for Information 
Minute of the Midlothian Integration Joint Board of 8 February 2024 51 - 66 
Minute of the Special Midlothian Integration Joint Board of 21 March
2024
67 - 76 
Page 24 of 238

Page 25

Midlothian Council Action Log 
No Date of
meeting
Item No and Title Action Action Owner Expected
completion
date
Comments
1 21/02/2023 Capital Plan
Prioritisation
Refer approved Council report to
BTSG on additional affordability
scope and projects.
Executive
Director Place
August 2023 Continued updates
regularly provided to
BTSG. 
Also a series of
thematic BTSG &
Group sessions
delivered over Oct/Nov
2023 and reported on
December 2023
Council agenda,
Report re- presented to
February 2024
Council.
Report to be re-
presented to May 2024
Council. 
Midlothian Council
Tuesday, 7 May 2024
Item No 5.3 
Page 25 of 238

Page 26

No Date of
meeting
Item No and Title Action Action Owner Expected
completion
date
Comments
2 19/12/2023 8.4 Non-Domestic
Rates Relief Policy
Review of policy to be undertaken
in 6 months – 1 year.
Chief Officer
Corporate
Solutions
No later than
April 2025 
3 19/12/2023 8.6 Annual Road
Works Performance
Report 2022/23
Consider identifying marks for
potholes as part of the continuous
improvement of road services.
Chief Officer
Place
April 2024 Assessing a method to
apply identifying marks
to potholes to indicate to
road users that the
Council is aware, and
these are scheduled for
repair. 
We aim to avoid
methods causing a
safety hazard as road
users take avoidance
action.
4 19/12/2023 8.8 Fleet and Plant
Asset Replacement
Plan
Considerations around increasing
fleet capacity to be brought to
BTSG.
Chief Officer
Place
June 2024 
5 26/03/2024 8.3 Midlothian Council
Housing Allocation
Policy Review 2023/24
1. provide further information in
relation to the viability of the
Housing Revenue account in
the long term.
2. consider providing physical
Executive
Director Place
1. August 2024
2. August 2024
3. August 2024
4. Referred for
Audit action. 
Page 26 of 238

Page 27

No Date of
meeting
Item No and Title Action Action Owner Expected
completion
date
Comments
assistance for moving as an
incentive for tenants to
downsize.
3. consider increasing the
financial incentive for
downsizing.
4. audit of tenancy agreements
5. arrange an Elected Member
briefing on tenancy
agreements.
6. review benefit in kind
5. Date to be
scheduled.
6. August 2024
6 26/03/2024 8.4 Midlothian Council
Mixed Tenure Strategy
Arrange an Elected Member
briefing on arms length
organisations (ALEOs)
Executive
Director Place
TBC Subject to exploration
of MMR model and
Special Purpose
Vehicle to establish
and operate scheme. 
Page 27 of 238

Page 28

Page 28 of 238

Page 29

MOTION TO MIDLOTHIAN COUNCIL
TUESDAY 7 MAY 2024 
Jo Cox Civility Commission 
Midlothian Council remembers Jo Cox MP for Batley and Spen, who was murdered
in June 2016 and David Amess MP, who was murdered in October 2021. 
Reiterates a statement made by Cox’s husband following the tragic event where
he urges everyone to “fight against the hatred that killed her.” 
Recognises the impact of the Jo Cox Foundation, set up in 2016, which nurtures
stronger communities, champions respect in politics and advocates for a fairer
world no matter one’s party colours. 
Notes, as part of their Respectful Politics workstream, the Jo Cox Civility
Commission (the Commission) was launched in February 2023 and
recommendations were published in January 2024 with the subheading ‘No place
in politics: tackling abuse and intimidation.’ 
Council further notes the Commission aims to find implementable solutions that
make a difference to the issues of abuse and intimidation of elected officials; in
their own words the “recommendations are deliberately ambitious.” 
Highlights that the calls to action and recommendations cover topics of co-
ordination, behaviour, political literacy, social media use, traditional media, police,
security, Parliaments (including devolved), local governments, elections and
political parties. 
This Council therefore confirms support of the Commission’s recommendations
and asks the Council Leader, Provost & Chief Executive to publicly endorse these
via the Commission’s website, and asks that the pledge, recommendations and
information be shared to all elected members and Community Councils. 
Council requests a report to the Standing Orders Committee which addresses how
the Council has adopted or considered recommendations in existing workstreams,
with specific reference to: 
Page 29 of 238

Page 30

a)  How the Council can improve risk planning for abuse at Council meetings and
other events.
b)  How the Council can ensure security and wellbeing resources are available
to staff and elected members.
c)  How we can engage with relevant toolkits such as the Local Government
Association’s ‘Debate Not Hate’ Councillor toolkit and the National
Association of Local Councils’ (NALC) Civility and Respect Project.
d)  How the Council can work with organisations like COSLA, Elect Her and local
organisations to remove barriers to Elected Office. 
Moved:      Seconded:
Councillor Kelly Parry    Councillor Debbi McCall
Page 30 of 238

Page 31

Midlothian Council
Tuesday 7 May 2024
Item 8.1 
School Session Dates 2025-2027 
Report by Fiona Robertson, Executive Director, Children, Young People
and Partnerships 
Report for Decision 
1 Recommendations 
Council is requested to: 
i. agree the school session dates proposed for the academic year
2025/26. 
ii. agree the school session dates proposed for the academic year
2026/27. 
2 Purpose of Report/Executive Summary 
The authority is required to set school session dates each year with
regard to statutory attendance.   
A scheme of session dates for Midlothian schools for the next two
academic years, 2025/26 and 2026/27, has been drawn up. These
session dates align closely with the dates set by neighbouring local
authorities.  Consultation was undertaken on these dates in April 2024
and they have been agreed with MNCT. 
The proposed session dates are attached to this report as Appendix B. 
Date 10 April 2024 
Report Contact:
Sinead Urquhart, Executive Business Manager
Sinead.Urquhart@midlothian.gov.uk 
Page 31 of 238

Page 32

2 
3 Background 
Officers from Edinburgh, East Lothian and Midlothian Councils
endeavour to synchronise session dates wherever possible, bearing in
mind some differences in local holidays. 
It has been possible to achieve close alignment for the next two years.
The only differences in are:
• East Lothian and Edinburgh start the December earlier, on the 18
December 2026/27, while we propose the 22 December.  
• East Lothian have a February in-service day rather than January. 
It is proposed that Midlothian will start the 2025/26 academic session
on Monday 11 August, with pupils commencing on Wednesday 13
August. The last day of the Midlothian school session will be Friday 26
June 2026. 
It is proposed that Midlothian will start the 2026/27 academic session
on Tuesday 11 August, with pupils commencing on Thursday 13
August. The last day of the Midlothian school session will be Tuesday
29 June 2027. 
The proposed session dates are attached to this report as Appendix B. 
4 Consultation and Feedback 
On 23 April 2024 MNCT agreed these proposed session dates. 
A consultation was carried out from Tuesday 16 April until Monday 22
April. Information was disseminated to unions parents/carers, parent
councils and staff. Information regarding the consultation was also put
on the Council website. People were asked to give their feedback via
the Education Consultation system. 
There were 570 respondents to the consultation, with 58% of those
agreeing with the proposed session dates.  Of the 570 respondents,
273 provided further comments.  While generally positive, the main
concern was around Easter weekend and April break in 2027. 
However, if we moved the April break to be continuous with Easter,
term three would be a week longer.  This proposal also aligns with the
proposals in Edinburgh and East Lothian. 
Agree 332 58%
Disagree 169 30%
No opinion 69 12%
Total 570   
Page 32 of 238

Page 33

3 
Midlothian will continue to undertake consultation with neighbouring
authorities with the aim of maintaining alignment of school session
dates for future years. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
None 
4.2 Digital 
None 
4.3 Risk 
By aligning with neighbouring authorities risk implications are mitigated
with regard to pupil attendance at school. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
This report does not recommend any change to policy or practice and
therefore does not require an Equalities Impact Assessment. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – School session dates 
Page 33 of 238

Page 34

4 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
N/A 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on delivering Best Value 
A.5 Involving Communities and Other Stakeholders 
Proposed dates have been shared and feedback sought from
establishments and parents and union representatives. Session dates
where possible have been synchronised with the City of Edinburgh and
East Lothian Councils. 
A.6 Impact on Performance and Outcomes 
Session dates have been designed to maximise attendance by
minimising the number of broken weeks for staff and pupils. 
A.7 Adopting a Preventative Approach 
N/A 
Page 34 of 238

Page 35

5 
A.8 Supporting Sustainable Development 
This proposal takes into account the need to deliver an educational
service across Midlothian which anticipates and acknowledges the
needs and views of stakeholders. 
Page 35 of 238

Page 36

6 
APPENDIX B 
MIDLOTHIAN COUNCIL
CHILDREN, YOUNG PEOPLE & PARTNERSHIPS
School Session Dates 2025/26 
TERM 1 Staff Resume Monday * 11 August 2025 
Pupils Resume Wednesday  13 August 2025         
Mid Term
Autumn Holiday 
All Break
Friday
Monday 
Friday
12
15 
10
September
September 
October
2025
2025 
2025 
Staff Resume Monday* 20 October 2025 
Pupils Resume 
Term Ends
Tuesday 
Friday 
21 
19
October 
December 
2025 
2025 
TERM 2 Staff Resume
All Resume
Monday*
Tuesday
5 
6
January
January           
2026
2026 
Mid Term  All Break  Friday  13  February  2026 
Pupils Resume 
Term Ends
All Break
Good Friday
Easter Monday 
Monday 
Thursday
3rd April 
6th April 
23   
2
February 
April 
2026 
2026
TERM 3 All Resume Tuesday  21 April 2026  
May Day Holiday  Monday  4  May  2026  
Victoria Day  Monday*  18  May  2026 
Term Ends Friday 26 June 2026       
* Staff In-Service Days: Monday 11th & Tuesday 12th August 2025
Monday 20th October 2025
Monday 5th January & Monday 18th May 2026 
Start date for session 2026/27 is Thursday 13th August 2026
Page 36 of 238

Page 37

7 
MIDLOTHIAN COUNCIL
CHILDREN, YOUNG PEOPLE & PARTNERSHIPS
School Session Dates 2026/27 
TERM 1 Staff Resume Tuesday * 11 August 2026 
Pupils Resume Thursday  13 August 2026         
Mid Term
Autumn Holiday 
All Break
Friday
Monday 
Friday
11
14 
9
September
September 
October
2026
2026 
2026 
Staff Resume Monday* 19 October 2026 
Pupils Resume 
Term Ends
Tuesday 
Tuesday 
20 
22
October 
December 
2026 
2026 
TERM 2 Staff Resume
All Resume
Wednesday*
Thursday
6 
7
January
January           
2027
2027 
Mid Term  All Break  Friday  12  February  2027 
Easter
Pupils Resume 
All Break
Good Friday
Easter Monday
All Resume 
Term Ends 
Monday 
Thursday
26th March 
29th March
Tuesday 
Friday 
22   
25     
30 
2
February 
March 
March 
April 
2027 
2027 
2027 
2027
TERM 3 All Resume Tuesday  20 April 2027  
May Day Holiday  Monday  3  May  2027  
Victoria Day  Monday*  24  May  2027 
Term Ends Tuesday 29 June 2027       
* Staff In-Service Days: Tuesday 11th & Wednesday 12th August 2026
Monday 19th October 2026
Wednesday 6th January & Monday 24th May 2027 
Page 37 of 238

Page 38

Page 38 of 238

Page 39

Midlothian Council
Tuesday, 7 May 2024
Item No 8.2 
Standing Orders Working Group – Progress Report 
Report by Saty Kaur, Chief Officer Corporate Solutions 
Report for Decision 
1 Recommendations 
Council is asked to: 
- Note the proposed work programme themes as listed in 3.2;
- Approve the Hybrid Meeting Protocol (Appendix B), as detailed in
3.3;
- Approve the proposed Deputations process (Appendix D), as
detailed in 3.4;
- Approve the change of notice of meeting for Council meetings and
the subsequent interim change to the motion deadline and
Questions to the Leader, as detailed in 3.6 – 3.8
- Approve the change to Council, Cabinet and Performance, Review
and Scrutiny Committee agendas in relation to Education reports,
as detailed in 3.9
- Note that formal approval by Council of any (or all) of the above will
require updates to the Standing Orders and associated Scheme(s)
accordingly. Council is requested to delegate authority to the
Executive Director Place to make the relevant changes following
Council approval. 
2 Purpose of Report/Executive Summary 
To provide an update on the work of the Standing Orders Working
Group and recommend immediate updates to the Standing Orders and
associated Scheme(s) for consideration. 
Date Monday 4 March 2024 
Report Contacts: 
Saty Kaur, Chief Officer Corporate Solutions
Saty.Kaur@midlothian.gov.uk 
Alan Turpie, Legal and Governance Manager
Alan.Turpie@midlothian.gov.uk 
Page 39 of 238

Page 40

2 
3 Background 
3.1 At its meeting of 28 March 2024, Standing Orders Working Group
(SOWG) considered an officer review of the Standing Orders and
associated Scheme(s), proposed workplan and actions that were
recommended for referral to Council for approval. The proposed
changes agreed by SOWG, are set out below in this report, and in two
subsequent reports that are listed on the agenda for the Council
meeting of 7 May 2024. 
Main Report   
Work Programme
3.2 Since the last meeting of SOWG, a work programme has been
developed. The work programme consists of the following thematic
areas: 
- Documentation: review of the Standing Orders and
associated Scheme(s).
- Protocols, processes and procedures: to include
presentation of the final hybrid working protocol for Council
approval, and formalising deputations, motions and call-in
procedures.
- Agenda and minutes: review the timelines for Council
reports distribution to provide elected members with more
time to read and consider papers, review the running order of
the Council agenda and review the formal record of
meetings.
- Templates: Review the presentation of reports.
- Committees: Review a range of Committees following
feedback from different elected members. 
Protocols, processes and procedures – proposed changes 
3.3 The interim Hybrid Meeting protocol was approved by Council at its
meeting of 9 May 2023, to be in effect until the review of Standing
Orders is complete. However, as the protocol has been in effect for
approximately 10 months, it is recommended that this is now
formalised. A review of the protocol has taken place by officers. Minor
changes are proposed to the interim version approved by Council, and
the proposed final version is contained in Appendix B for approval. 
3.4 Deputations are referenced in the Standing Orders under 4.3 however
there is currently no formal written process for deputations within the
Standing Orders. Appendix C presents the formal written process to be
approved by Council. 
3.5 Both the Hybrid Meeting protocol and the Deputations process have
been considered by SOWG and approved for referral to Council.   
Page 40 of 238

Page 41

3 
Agenda and Minutes
3.6 Following feedback from Elected Members at recent meetings of
Council and its Committees, it is proposed to extend the notice of
meeting for Council. This would be a change from 7 working days to 10
working days for Council papers issued to elected members and
members of the public. Council is recommended to agree this change
to be effective for its next meeting on Tuesday 25 June 2024. 
3.7 Council are also asked to agree, if the above change is to be made,
then the motion deadline should be changed to be noon 12 working
days prior to the date of the Council meeting, to ensure inclusion in the
notice of meeting pack. Council is asked to note that a formal review of
motions process is included in the work programme, therefore this
would be an interim change until this review is completed. 
3.8 Subsequently, Questions to the Leader would require to be changed to
follow the revised timeline. Council is asked to agree the change from 9
working days to 12 working days. 
3.9 Following discussion with the Religious Representatives, it is proposed
that Education related items for discussion/decision are positioned first
in the reports section of the Council, Cabinet and Performance, Review
and Scrutiny Committee agendas (with the exception of Council
meetings where those reports have a financial implication that requires
the agreement of associated financial papers first). This would enable
the Religious Representatives to attend for these and leave the
meeting. This follows similar running orders in other Local Authorities.
Council is recommended to endorse this change, noting that there is a
formal review of the running order of agendas taking place and this
would be an interim arrangement until the review is concluded.  
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
No implications 
4.2 Digital 
No implications 
4.3 Risk 
No implications 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
No implications 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A
Page 41 of 238

Page 42

4 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Hybrid Meetings protocol
Appendix C – Deputations process 
Page 42 of 238

Page 43

5 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
Not applicable 
A.5 Involving Communities and Other Stakeholders 
Not applicable 
A.6 Impact on Performance and Outcomes 
Not applicable 
A.7 Adopting a Preventative Approach 
Not applicable 
A.8 Supporting Sustainable Development 
Not applicable 
Page 43 of 238

Page 44

Page 44 of 238

Page 45

1 
MIDLOTHIAN COUNCIL
PROTOCOL FOR THE USE OF VIDEO CONFERENCING FACILITIES 
The following protocol shall be adopted in relation to the conduct of hybrid meetings of the
Council and its various Committees. Participation via video conferencing will be permitted from
remote locations where a secure videoconference link can be established. 
Prior to the Meeting 
1) Any Member wishing to participate by video conference link in any hybrid meeting of the Council,
or of a Committee or Sub-Committee, must intimate their request in writing to the Clerk not less
than 24 hours in advance of the meeting taking place (excluding the day of the meeting) 
a. Please note that the procedure and timescales quoted in Paragraph 1 of this protocol
regarding participation by video conference link will also apply to any other person who is
required to take part in a regulatory or appeal hearing. 
2) The Clerk will immediately notify the relevant Chair and will take steps to ensure that the link
can be established, that support for this link and for the Member using it can be provided, and
that all associated facilities, e.g. telephone, email, are available. 
3) For the avoidance of doubt, the Chair may not participate remotely in any hybrid meeting. 
4) In the case of several requests being received for the establishment of multiple remote links for
the same meeting, such requests will be considered in chronological order of receipt until the
maximum number that the equipment can support has been reached, subject to priority being
given to voting members of the relevant Committee. 
5) Details of email facilities at the remote venue must be verified and tested. 
6) The video conference link must be established and tested before the commencement of the
meeting. 
7) The video conferencing equipment must be arranged in such a way that the Chair can see the
remote Member(s), as well as those present in the Chamber or meeting room. 
At the meeting 
8) The Chair will confirm at the outset and at any reconvening of the meeting that he/she can see
and hear all participating Members. Any Member participating by remote link must also confirm
at the outset and at any reconvening of the meeting that he/she can see and hear the
proceedings at the main venue and at all other remote links. 
9) Any Member participating by remote link who declares an interest in any item of business
required to leave the room or determines to do so, shall log out of the meeting and will be advised
by a member of the Democratic Services team when he/she may re-join the meeting. Either the
Chair or the Clerk should narrate that the member has left/re-joined the meeting for transparency
for public broadcasting. 
10) Should any aspect of the video conference link fail, the Chair will call a short adjournment of up
to fifteen minutes, the precise extent to be at the Chair’s discretion, to determine whether the
link can quickly be re- established. If not re-established within this time, the Chair will temporarily
suspend discussion of the item under consideration at the time of link failure and continue with
the remaining agenda items. Efforts should continue to re-establish the link. The Chair will return
to the suspended item on re-establishment, or on confirmation that this cannot be done, or before
the end of the meeting, whichever is the earliest. For clarity, the item under consideration at the
point of any re-establishment of a link will be concluded before returning to the suspended item. 
Page 45 of 238

Page 46

2 
11) In the event of link failure, the remote Member(s) will be deemed to have left the meeting at the
point of failure of the equipment and if the link cannot be re-established before the end of the
meeting (as detailed in 10) then the presumption will be that the meeting should continue to deal
with the item. If the link is successfully re-established, then the remote Member(s) will deem to
have returned at the point of re-establishment. 
12) Should a remote Member wish to move a motion or amendment, the Member may arrange for
this to be emailed on his/her behalf. In this case, if necessary, a short adjournment should be
called to allow delivery of the email to the Clerk. Should the email equipment transmission fail,
back-up arrangements for transmission by email should be available. 
13) A remote Member participating in a vote will cast his/her vote as if participating in a roll call vote. 
Regulatory Committees 
14) As the Council must be able to demonstrate that decisions of a regulatory nature are taken on
the basis of the same information being available to all Members involved in the decision, any
additional papers tabled at a meeting of a Planning Committee, General Purposes Committee
or any other Regulatory body must be emailed to the remote venue and time allowed, by a short
adjournment if necessary, for these to be delivered to and read by the remote Member. 
15) Similarly, to help ensure that a remote Member can clearly follow any officer presentation, where
hard copy documents are circulated at a meeting, separate copies of these documents must be
emailed to the remote venue and time allowed, by a short adjournment if necessary, for these
to be delivered to the remote Member in addition to using the video conferencing link. 
Please note that Paragraphs 14 and 15 will also apply to any other person who is required to
take part in a Hearing. 
Confidential/Exempt Items 
16) Should any member participate in the discussion of a confidential/exempt item, it is the
member’s responsibility to ensure that his/her location is secure and that proceedings
cannot be heard by any member of the public not entitled to attend that part of the
meeting. Members are specifically reminded of their responsibilities to maintain
confidentiality in terms of the Councillor’s Code of Conduct. 
17) The Chair will remind members of the terms of Paragraph 16 before entering into private
session, but it remains each member’s individual responsibility to comply with the terms of the
Councillors’ Code of Conduct at all times. 
Appointments 
18) A remote Member may participate on the same basis as the other Members present in an
Election, Selection or Appointment of Members of the Council to any particular office, Committee
or other Group or outside body where the Council determines that the vote will be by show of
hands. If the vote is taken, the remote Member will require to state his/her preferences via the
link and will not be able to enjoy confidentiality. 
Page 46 of 238

Page 47

3 
Good Practice 
19) The following are good practice for remote participants:
• When joining remotely, keep audio on mute when not speaking similar to having
microphones off when in the Chamber in person
• Where possible/appropriate, turn on video when speaking so members of the
Committee and public can see the speaker
• When wishing to speak as a remote participant, use any of the functionalities of the
video conference link to signal request to speak i.e. using the ‘hands up’ function within
Teams, and wait for the Chair to call you in
Page 47 of 238

Page 48

Page 48 of 238

Page 49

Making a deputation to Midlothian Council.
Thank you for your request to make a deputation to Council. A
deputation is a group of persons acting on behalf of a group or
organisation to make representations to the Council.
The deputation request must be submitted by email or in writing, setting
out the subject of the deputation and must relate to an item of business
on the agenda for that meeting and be on an issue included in the
Council’s powers or duties.
If the request is received after the agenda has been issued and more
than five working days prior to the council meeting; then the Executive
Director, in conjunction with the Chief Executive and the Provost, will
determine if the deputation will be added to the agenda.
If the deputation is on the agenda then the following process will apply;
The Council meeting will be asked whether they wish to hear the
deputation, and
If the Council agree to hear the deputation then the following will
apply:
 Only two members of the delegation can address the Council
 They can only address the meeting for a maximum of ten minutes
in total
 There would then follow a maximum period of ten minutes for
questions and answers.
 The deputation can only inform the Council and may not request
the Council to do anything – that would require a petition which is
a separate process.
The Provost, or chair of the meeting, can stop you or your supporter
speaking if you talk about something which is inappropriate or not
relevant or if you behave in an inappropriate way when you present your
statement.
Page 49 of 238

Page 50

Page 50 of 238

Page 51

Midlothian Council
Tuesday, 7 May 2024
Item No 8.3 
Education Appeals Committee – update to membership 
Report by Saty Kaur, Chief Officer Corporate Solutions 
Report for Decision 
1 Recommendations 
Council is asked to: 
- Agree to change the membership of the Education Appeals
Committee to 3 from 5 members;
- Agree to amend the quorum of the Education Appeals Committee to
3 members in line with the above change of membership number;
and
- Agree to update the associated Scheme to i) clarify that in terms of
the relevant statute the Religious Representative of the Council
requires to be appointed to a relevant committee prior to
appointment to the Education Appeals Committee, ii) reflect that the
Scottish Committee of the Administrative Justice and Tribunals
Council has now been disbanded and iii) clarify that in terms of the
relevant statute, if a member of the Committee requires to leave
during a Hearing, the Hearing cannot continue (even if the parties
would agree).
- Note that formal approval by Council of any (or all) of the above will
require updates to the Standing Orders and associated Scheme(s)
accordingly. Council is requested to delegate authority to the
Executive Director Place to make the relevant changes following
Council approval. 
2 Purpose of Report/Executive Summary 
To request approval for the membership and quorum of the Education
Appeals Committee to change from 5 members to 3 members, and to
make required amendments to the Scheme of Administration relative to
the Education Appeals Committee.   
Date Monday 4 March 2024 
Report Contacts: 
Alan Turpie, Legal and Governance Manager
Alan.Turpie@midlothian.gov.uk 
Suzanne Ross, Principal Solicitor and Notary Public
Suzanne.Ross@midlothian.gov.uk 
Page 51 of 238

Page 52

2 
3 Main Report 
3.1 Education Appeals Committee is established in terms of the Education
(Scotland) Act 1980 and gives parents the right to appeal against
decisions of the Education Authority on: 
• The schools, excluding nursery schools or classes, their children
should attend (placing appeals); and 
• The exclusion of a pupil from school. 
3.2 Placing appeals usually take place around May/June annually,
following on from the Education Authority’s placement notification. In
recent years, placing appeals have increased, and more Education
Appeals Committees have been required to respond to this demand. 
3.3 Currently, as per the Scheme of Administration, the Education Appeals
Committee comprises 5 persons as follows: 
• Elected Members or Religious Representative of the Council;
and 
• Non-Elected Members who meet the statutory criteria; one of
whom shall be the Chair. 
3.4 Elected Members or Religious Representatives cannot outnumber Non-
Elected Members by more than one.  This means that at present at
least two Non-Elected Members must sit on every Education Appeals
Committee. 
3.5 Non-Elected Members are volunteers and receive no payment for this
role. There is currently a challenge recruiting Non-Elected Members,
which is being experienced across Local Authorities. This, in addition to
the requirement to hold more Education Appeals Committees for
placing appeals, has prompted a review of the placing appeals
process. 
3.6 The current process is being reviewed to identify ways that the
administration of the process could be streamlined for appellants and
the internal Council services involved in the placing appeals process;
as well as options to hold conjoined Committees. These changes will
be implemented as soon as reasonably practicable. 
3.7 To support the improved delivery of Education Appeals Committees, it
is proposed to change the membership from 5 to 3. Subsequently the
quorum would change from 5 to 3. In terms of the Education (Scotland)
Act 1980, an appeal committee shall consist of 3, 5 or 7 members,
therefore this change would be in line with the legislation. The change
to 3 members would enable better scheduling of committees to
respond to the anticipated number of placing appeals for the 2024/25
school year. 
Page 52 of 238

Page 53

3 
3.8 If Council agree to the recommendation to amend the number of
members of the Committee from 5 to 3, the Standing Orders and
associated Scheme(s) relative to Education Appeal Committees will
require to be updated.  It is also recommended that the associated
Scheme is amended to reflect the current statutory position as follows:  
i)    Schedule A1 of the Education (Scotland) Act 1980 provides that to
be appointed to the Education Appeals Committee, a person must
be a member of the authority (ie an Elected Member) or already
have been appointed to a committee “whose purposes include
advising the authority on any matter relating to the discharge of any
of their functions as education authority or discharging any of those
functions on behalf of such authority”.  Accordingly, Religious
Representatives are required by statute to have been appointed to
an advisory education committee, prior to being appointed to the
Education Appeals Committee.  It is recommended that wording is
inserted to clarify that Religious Representatives are appointed in
accordance with the relevant statutory criteria.
ii)   The Scheme makes reference to the Scottish Committee of the
Administrative Justice and Tribunals Council.  This body has since
been disbanded, and therefore it is recommended that this
reference is deleted.   
iii)  The Scheme provides that where a member of the Committee
requires to leave during an appeal, the Committee can continue if
parties to the appeal so agree.  This does not comply with the
relevant legislation, which provides that a Hearing must be
adjourned where it does not comply with the required to have 3, 5
or 7 members.  It is recommended that this sentence is deleted. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
If the membership changes are refused, this will place significant
pressure on internal services to deliver unknown numbers of placing
appeals with limited non-elected members. There would be real risk
that not all Education Appeals Committees would be completed by the
start of the summer holidays, which would result in some
parents/carers having uncertainty over the summer period as to which
school their child will attend for the 2025/26 school term. 
4.2 Digital 
No implications 
Page 53 of 238

Page 54

4 
4.3 Risk 
If the membership changes are refused, this will place significant
pressure on internal services to deliver unknown numbers of placing
appeals with limited non-elected members. There would be real risk
that not all Education Appeals Committees would be completed by the
start of the summer holidays, which would result in some
parents/carers having uncertainty over the summer period as to which
school their child will attend for the 2025/26 school term. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
No implications 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications 
Page 54 of 238

Page 55

5 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
Not applicable 
A.5 Involving Communities and Other Stakeholders 
Not applicable 
A.6 Impact on Performance and Outcomes 
Not applicable 
A.7 Adopting a Preventative Approach 
Not applicable 
A.8 Supporting Sustainable Development 
Not applicable 
Page 55 of 238

Page 56

Page 56 of 238

Page 57

Midlothian Council
Tuesday, 7 May 2024
Item No 8.4 
Joint Consultative Group – update to membership 
Report by Saty Kaur, Chief Officer Corporate Solutions 
Report for Decision 
1 Recommendations 
Council is asked to: 
- Agree to change the membership of the Joint Consultative Group; 
- Note that formal approval by Council of the above will require
updates to the Standing Orders and associated Scheme(s)
accordingly. Council is requested to delegate authority to the
Executive Director Place to make the relevant changes following
Council approval. 
2 Purpose of Report/Executive Summary 
To request approval for a change to the membership of the Joint
Consultative Group. 
Date Monday 4 March 2024 
Report Contacts: 
Saty Kaur, Chief Officer Corporate Solutions
Saty.Kaur@midlothian.gov.uk 
Alan Turpie, Legal and Governance Manager
Alan.Turpie@midlothian.gov.uk 
Page 57 of 238

Page 58

2 
3 Main Report 
3.1 Midlothian Joint Consultative Group (JCG) provides a forum for regular
consultation between Midlothian Council and representatives of
recognised Trade Unions. 
3.2 As part of the review of Standing Orders and associated Schemes, the
Joint Consultative Group current membership does not reflect the
requirements set out in the Scheme of Administration. The
membership, as per the Scheme, is:
• UNISON (4)
• Educational Institute of Scotland (3)
• Scottish Secondary Teachers’ Association (1)
• National Association of Schoolmasters/Union of Women
Teachers (1)
• Unite (2)
• Union of Construction, Allied Trades and Technicians (1) 
3.3 The Union of Construction, Allied Trades and Technicians, merged with
Unite and therefore is not required to be listed within the Scheme. In
addition, as part of the Recognition and Procedural Agreement, GMB is
a recognised Trade Union. If agreed, the membership would be:
• UNISON (4)
• Educational Institute of Scotland (3)
• Scottish Secondary Teachers’ Association (1)
• National Association of Schoolmasters/Union of Women
Teachers (1)
• Unite (2)
• GMB (2)  
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
No implications 
4.2 Digital 
No implications 
4.3 Risk 
No implications 
Page 58 of 238

Page 59

3 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
No implications 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A
Appendices 
Appendix A – Additional Report Implications 
Page 59 of 238

Page 60

4 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
Not applicable 
A.5 Involving Communities and Other Stakeholders 
Not applicable 
A.6 Impact on Performance and Outcomes 
Not applicable 
A.7 Adopting a Preventative Approach 
Not applicable 
A.8 Supporting Sustainable Development 
Not applicable 
Page 60 of 238

Page 61

Midlothian Council
Tuesday, 7 May 2024
Item No 8.5 
Edinburgh, the Lothians and Scottish Borders MAPPA Annual Report for
2022/2023 
Report by Julie Jessup, Service Manager, Justice and Protection
Services 
Report for Information 
1 Recommendations 
Council is requested to note the information in the Edinburgh, the
Lothians and Scottish Borders MAPPA Annual Report for 2022/2023. 
2 Purpose of Report/Executive Summary 
The report advises of the activities undertaken by the agencies across
Edinburgh, the Lothians and Scottish Borders who work in partnership
as part of Multi - Agency Public Protection Arrangements and statistical
information. 
Date: 8th March 2024 
Report Contact:
Julie Jessup, Service Manager – Justice and Protection Services
julie.jessup@midlothian.gov.uk 
Page 61 of 238

Page 62

2 
3 Background/Main Body of Report 
3.1 Multi-Agency Public Protection Arrangements, more commonly referred
to as MAPPA, are a set of partnership working arrangements put in
place for the fundamental purpose of public protection and managing
the risk of serious harm.  MAPPA is not a statutory body, but it is a
statutory framework through which the Responsible Authorities
discharge their responsibilities to protect the public in a co-ordinated
manner.   
MAPPA was introduced in Scotland in 2007 by The Management of
Offenders etc. (Scotland) Act 2005. This Act also outlines the
responsibility of the Strategic Oversight Group (SOG) to provide local
leadership across the MAPPA area, to be responsible for performance
monitoring and quality assurance and for the submission of the Annual
Report. 
In 2007 the following categories of individuals were subject to 
management under MAPPA: 
• Registered Sex Offenders (RSOs) – those individuals required
to comply with the sex offender notification requirements
(SONR) 
• Restricted Patients.- patients subject to a compulsion order with
restriction order, a hospital direction or a transfer for treatment
direction; that is patients who are subject to special restrictions
under the Mental Health (Care and Treatment) (Scotland) Act
2003. 
In 2016 the Scottish Government updated the MAPPA Guidance to 
include a 3rd category: 
• Other Risk of Serious Harm Individuals - these are individuals
who are not required to comply with the SONR or who are not
Restricted Patients; but who by reason of their conviction; are
considered by the Responsible Authorities to be persons who
may cause serious harm to the public at large. 
There are three MAPPA management levels to ensure that resources 
are focused where they are needed most to reduce the risk of harm. 
These are: 
• Level 1 - routine risk management by the Responsible Authority
• Level 2  - Multi agency risk management
• Level 3  - Multi-agency Public Protection Panels. 
Page 62 of 238

Page 63

3 
Partnership working is a key function within MAPPA and brings 
together representatives from the Responsible Authorities: Police
Scotland, Social Work, Housing, Health and Scottish Prison Service to
oversee the practical management of those who have committed a
sexual offence, or who are assessed to pose a significant risk of harm
to the public. 
The 2022/23 report includes a forward completed by Joan Tranent,
Chair of the Edinburgh, Lothians and Scottish Borders Strategic
Oversight Group which highlights the work undertaken by all agencies
to manage individuals who present the highest risk of harm to our
communities and the importance of the presence of stabilising factors
such as accommodation, access to support networks and being
integrated into local communities.  The housing of individuals, who
have committed sexual offences, is a matter on which some members
of the public can have strong opinions.  It is important that we work with
our communities to raise understanding and awareness of public
protection and that public protection is our highest priority. 
3.2 Statistical Information
The data within the Annual Report shows that there were 780
Registered Sex Offenders (RSO) managed under MAPPA in
2022/2023.  This is a 14% decrease on the previous year.  The number
of individuals managed under MAPPA is impacted on by a number of
factors including the reporting and detection of crime and Court
sentencing. The table below shows the figures since 2019/2020. 
Number of Registered Sex Offenders managed between: 
1st April 2022 and 31st March
2023
780
1st April 2021 and 31st March
2022
912
1st April 2020 and 31st March
2021
899
1st April 2019 and 31st March
2020
916  
The majority of cases continue to be managed at Level 1: 767 (98%)
with the remaining 13 individuals being managed at Level 2. There
were no cases managed under Category 3 (Other Risk of Harm
Offender) in the reporting year. 
Reconviction rates: Across the Edinburgh, Lothians and Scottish
Borders the reconviction rates for RSOs continues to remain relatively
low. Iin the reporting year 25 individuals were convicted of a further
Group 1 (non-sexual violent) crime or Group 2 (Sexual) crime in the
reporting year (3%).   
Page 63 of 238

Page 64

4 
Although not contained in the Annual Report I have provided the
following figures for Midlothian to provide a local context for individuals
managed under MAPPA.   
Midlothian 2021 2022 2023
RSOs managed in the
community on 31 March
52 55 52
RSO’s subject to
statutory supervision 
18 19 15
RSOs managed at Level
1 in the community on
31 March
51 53 51
RSOs managed at Level
2 in the community on
31 March 
1 0 3
RSOs managed at Level
3 in the community on
31 March
0 1 0
RSOs reported for
breaches of notification
1 0 1
RSOs convicted of a
further group 1 or group
2 crime
(1 relates to non-sexual
crimes of violence and
group 2 relates to sexual
crimes.)
1(group 1) 
1(group 2)
2 (Group 1) 1 (Group 1) 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
There are no direct resource requirements arising from this report. 
4.2 Digital 
There are no digital implications related to this paper 
4.3 Risk 
The MAPPA process makes a significant contribution to the
management of risk and the protection of the public in Midlothian.   
Page 64 of 238

Page 65

5 
There are risks associated with the potential for negative media
coverage of individuals managed under MAPPA within Midlothian.  To
mitigate against this there are robust communication and contingency
plans out in place in advance of the release of any individual whose
case may attract media attention.   
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
There are no equalities issues arising from this report. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices: 
Appendix A – Additional Report Implications
Appendix B – Edinburgh, the Lothians and Scottish Borders MAPPA Annual
Report 2022-23
Appendix C - MAPPA Scotland 2022 – 23 National Overview Report 
Page 65 of 238

Page 66

6 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Midlothian will be Safer 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value 
A.5 Involving Communities and Other Stakeholders 
The MAPPA Annual Report is accessible to the public.  The Scottish
Government also publishes National Overview Report which is included
as an appendix.   
As part of performance management collaborative feedback is sought
from service users to ensure effective service provision and information
provided is appropriate and relevant.  All service users subject to
supervision, as part of a licence or order imposed by the Court,
complete an entry and exit questionnaire to support service
improvement. 
Page 66 of 238

Page 67

7 
A.6 Impact on Performance and Outcomes 
To ensure that the statutory duties of MAPPA are discharged
effectively there are two Groups that provide oversight and governance
across Edinburgh, the Lothians and Scottish Borders: Strategic
Oversight Group and MAPPA Operational Group.  Together they have
oversight and co-ordination of MAPPA and have a responsibility to
share learning, develop best practice and promote consistency.   
The East and Midlothian MAPPA Group (EMMG) is a local partnership
approach to the management of high-risk offenders in East Lothian and
Midlothian and provides strategic direction to local agencies.  The
EMMG reports to the Public Protection Committee and the Critical
Services Oversight Group. 
While this is a challenging area of work there is no evidence of
concerning practice or delivery of MAPPA in Midlothian.  Justice Social
Workers are highly skilled and trained in the use of accredited risk
assessment tools.  In collaboration with other agencies, they formulate
risk and from this develop risk management plans to manage and
supervise individuals convicted of sexual offences or who have caused
significant harm to others.   
The Edinburgh, the Lothians and Scottish Borders Strategic Oversight
Group has continued to support the development of practice and during
this reporting year a number of on-line multi-agency training events
were held.  This included two events to provide staff with the key
information of the learning from Significant Case Reviews, Initial Case
Reviews and MAPPA case file audits. The events were attended by
staff and managers from all agencies engaged in the management of
high-risk offenders. 
A.7 Adopting a Preventative Approach 
The fundamental purpose of MAPPA is public protection.  As one of the
key partners the Justice Service focus on early prevention and
intervention strategies to reduce the risk of offending behaviour and to
ensure that Midlothian is safer. Within legislation there are a number of
monitoring interventions and strategies which agencies can use as part
of preventative measures.  This includes the use of remote electronic
monitoring equipment and Sexual Offences Prevention Orders. 
A.8 Supporting Sustainable Development 
Not applicable 
Page 67 of 238

Page 68

8 
Appendix B – Edinburgh, the Lothians and Scottish Borders MAPPA Annual
Report 2022-23 
Edinburgh, the
Lothians and Scottish Borders MAPPA Annual Report 2022 -2023.pdf 
Appendix C - MAPPA Scotland 2022 – 23 National Overview Report 
multi-agency-public-
protection-arrangements-mappa-scotland-national-overview-report-2022-23.pdf   
Page 68 of 238

Page 69

2022-2023
Edinburgh, the Lothians and
Scottish Borders Multi-Agency
Public Protection Arrangements
Edinburgh, the Lothians and
Scottish Borders Multi-Agency
Public Protection Arrangements
ANNUAL
REPORT
2022-2023
Page 69 of 238

Page 70

2022-2023
Edinburgh, the Lothians and
Scottish Borders Multi-Agency
Public Protection Arrangements
Edinburgh, the Lothians and
Scottish Borders Multi-Agency
Public Protection Arrangements
Page 70 of 238

Page 71

2022-2023
Contents
1 Foreword  2
2 Multi-Agency Public Protection Arrangements in 
Edinburgh, the Lothians and Scottish Borders 4
3 Roles and Responsibilities 6
4 Achievements in Developing Practice 12
5 Strategic Overview Arrangements 15
6 Statistical Information  17
Page 71 of 238

Page 72

2022-2023
Edinburgh, the Lothians and
Scottish Borders Multi-Agency
Public Protection Arrangements
\2
1
Foreword
Page 72 of 238

Page 73

2022-2023
\3
Multi Agency Public Protection
Arrangements (MAPPA) are a mechanism
through which agencies can discharge
their statutory responsibilities more
effectively and protect the public in
a co-ordinated way. The purpose of
MAPPA is to help reduce the re-offending
behaviour of sexual and violent offenders
to protect the public from serious harm.
Agencies across Edinburgh, the
Lothians and Scottish Borders work in
partnership to manage those individuals
who present the highest risk of harm
to our communities. The strength
of the partnership between prison,
police, health and local authority has
continued to strengthen since the
introduction of MAPPA.
When a sex offender is released from
prison subject of statutory supervision, or
is subject of statutory supervision as part
of a community order, they are required
to be housed within their own council
area. An offender cannot be placed in
another council area without the consent
and agreement of the receiving local
authority area.
Extensive research and reviews by
experts have shown that the provision
of stable housing, access to support
networks and effective monitoring are
key ways to minimise the risks posed by
sex offenders. If we move sex offenders
from neighbourhood to neighbourhood
we may push them away from the very
support that is promoting a positive
change in their life, to be replaced by a
vacuum that may lead to re-offending.
We recognise and understand that
members of the public may have strong
feelings about the housing of sex
offenders in their communities and our
aim is to work with the community and
to reassure people that public safety
remains our highest priority.
Re-offending by people managed under
MAPPA remains low and this reflects the
work we do together. Our utmost priority
is to keep the public safe, particularly
the most vulnerable members of our
communities.
Joan Tranent 
Chair Edinburgh, the Lothians and
Scottish Borders Strategic Oversight
Group
Foreword
Page 73 of 238

Page 74

2022-2023
Edinburgh, the Lothians and
Scottish Borders Multi-Agency
Public Protection Arrangements
\4
2
What is MAPPA?
Multi-Agency Public Protection
Arrangements in Edinburgh, the
Lothians and Scottish Borders
Multi-Agency Public Protection Arrangements (MAPPA)
provide a framework to manage the risk posed by
registered sex offenders and restricted patients
(mainly violent offenders, with a small number of
sex offenders). On 31 March 2016, the Scottish
Government published new MAPPA Guidance.
This guidance reflects the new risk of serious
harm category 3, for offenders who by
reason of their conviction are subject
to supervision in the community, and
are assessed by the responsible
authorities as posing a high or
very high risk of serious harm
to the public, which requires
active multi-agency
management at MAPPA
Level 2 or 3.
Page 74 of 238

Page 75

2022-2023
\5
On 31 March 2022, the Scottish
Government published an updated
version of the National MAPPA Guidance,
which reflects an on-going programme
of revision to take into account new
legislation as well as changes in guidance,
policy and effective practice.
MAPPA brings together professionals
from the police, social work, housing,
health and the Scottish Prison Service
in Edinburgh, the Lothians and Scottish
Borders. These agencies are known
as the ‘responsible authorities’. While
the arrangements are co-ordinated by
a central unit based in Edinburgh, the
practical management of offenders
remains the responsibility of these
agencies at local level.
The area covered by our arrangements
incorporates the local authority areas
of the City of Edinburgh, East Lothian,
Midlothian, West Lothian and the Scottish
Borders, representing a mixture of urban
and rural areas.
The responsible authorities represented
are: 
» The City of Edinburgh Council
» East Lothian Council
» Midlothian Council
» West Lothian Council 
» Scottish Borders Council
» Police Scotland
» Scottish Prison Service
» NHS Lothian 
» NHS Borders
There are three MAPPA management
levels to ensure that resources are
focused where they are needed most to
reduce the risk of harm. Over the course
of this annual reporting year, we managed
963 registered sex offenders under
MAPPA; 93.25% (898) at Level 1; 6.65%
(64) at Level 2; and 0.10% (1) at Level 3.
Over the course of this annual reporting
year we managed 10 CAT 3 Violent
Offenders under MAPPA and all were
managed at MAPPA Level 2.
Over the past year, there have been
60 MAPPA Level 2 meetings across
Edinburgh, the Lothians and Scottish
Borders, which managed RSOs
and serious risk of harm violent
offenders. We have returned to face
to face meetings but with the added
advantage of attendees being able to
join the meeting via MS Teams, where
appropriate. Each Level 2 meeting
will consider a number of offenders.
A Level 3 meeting will only consider
one offender and there were 6 Level 3
meetings convened during the reporting
year, which all related to the an RSO.
The 2022/23 MAPPA National Annual
Report provides a picture of the
main national developments
in relation to MAPPA and
can be viewed on the
Scottish Government
website under recent
publications.
Page 75 of 238

Page 76

2022-2023
Edinburgh, the Lothians and
Scottish Borders Multi-Agency
Public Protection Arrangements
\6
3
Roles and
Responsibilities
Page 76 of 238

Page 77

2022-2023
\7
The responsible authorities for each area
are required to involve other key agencies
in the management of offenders. This is
an important part of MAPPA, involving the
exchange of information and drawing on
the collective knowledge and expertise
of numerous agencies. The roles and
responsibilities in relation to MAPPA in our
local area are outlined below.
Police Scotland is responsible for
the enforcement of the notification
and compliance requirements of the
Sexual Offences Act 2003 (sex offender
registration), and for policing activities,
including risk assessment, preventative/
monitoring strategies, as well as
investigation and prosecution of any
registered sex offender who re-offends.
Responsibilities include: maintaining
an accurate record of those offenders
resident in each local authority area
subject to the notification requirements;
the creation of risk management plans to
mitigate or reduce risk; making enquiries
where such persons fail to comply with
the requirements placed on them and
managing sex offenders whose current
behaviour is of concern. Police Scotland
is the lead responsible authority for
those community-based registered sex
offenders who are not subject to any
other form of statutory supervision. These
duties are carried out in partnership with
all responsible authorities and ‘duty to co-
operate’ agencies.
The local authority is the responsible
authority for registered sex offenders
who are subject to statutory supervision.
The Council’s justice social work service
is responsible for the supervision of such
offenders but housing, adult social care
and children and families services also
play a key role in the management of sex
offenders in the community.
Justice social work makes a significant
contribution to public protection by
supervising and managing registered
sex offenders in accordance with the
requirements of MAPPA and other public
protection-related legislation.
Page 77 of 238

Page 78

2022-2023
\8
Social workers supervise offenders
on community payback orders and
prisoners who have been released
subject to formal supervision. Social
workers are required to use accredited
risk assessment tools, and develop plans
for the risk management and supervision
of offenders in collaboration with other
agencies. Social workers can request that
additional requirements or conditions
be placed on orders and licences by the
courts and the Parole Board.
These requirements and conditions
can range from restrictions relating to
accommodation and employment, to
instructions to avoid certain locations
or victims, or to attend counselling
or treatment programmes. These
requirements and conditions allow
social workers to monitor and influence
aspects of offender’s behaviour, as
breaches of requirements or conditions
can lead to the court or Parole Board
returning the offender to custody.
Each local authority in Edinburgh, the
Lothians and Scottish Borders has a
Sexual and Violent Offender Liaison
Officer (SAVALO) or Lead Officer in the
justice social work service who acts as
a single point of contact for information
relating to registered sex offenders
and violent offenders managed
under MAPPA. They are responsible
for chairing risk management case
conferences and liaising with other
agencies as appropriate.
Local authority housing SOLOs are
responsible for offenders access to
housing. This includes accessing
temporary accommodation and
identification of suitable permanent
housing. Registered social landlords
contribute to public protection. As a
‘duty to co-operate’ agencies, they work
with the local authority housing SOLO to
identify positive housing solutions.
The role of the housing service is to
contribute to the ‘responsible authorities’
management of risk through:
	
» providing suitable accommodation
	
» contributing to environmental
risk assessments to ensure
accommodation is appropriate
	
» liaising with the responsible
authorities regarding the ongoing
management and monitoring
of the risk of the offender as a
tenant, including any tenancy
moves or evictions
	
» having regard to community safety
and having in place contingency
plans for when a property is
no longer suitable and/or the
offender’s safety is at risk.
Page 78 of 238

Page 79

2022-2023
\9
The local authority is responsible for
ensuring the development of a strategic
response to the housing of sex offenders.
However, in any local authority area there
is likely to be a multiplicity of housing
providers, and local authorities must
involve and consult registered social
landlords in their area when developing
their strategic response.
It is the responsibility of the local authority
to provide an initial single point of contact
for accommodation requests from other
responsible authorities. This single point
of contact is the housing SOLO, whose
role involves:
	
» identifying the most appropriate
housing provider following risk
assessment
	
» ensuring that when an appropriate
housing provider has been
identified, they are included by the
responsible authorities in liaison
arrangements relevant to the
identification of appropriate housing
and the management of risk
	
» liaising pro-actively with responsible
authorities and housing providers
regarding ongoing risk management
and community safety issues.
NHS Lothian continues to play an
important role in MAPPA locally through
being the responsible authority for
mentally disordered restricted patients
and in fulfilling its wider duty to co-
operate in the management of violent
offenders and registered sex offenders.
NHS Lothian has a Public Protection
structure (including child protection,
adult protection and MAPPA) which is
the responsibility of the Executive Nurse
Director at Health Board level.
There is a Director for Public Protection,
a Clinical Nurse Manager, a MAPPA
Health Liaison Officer, alongside
Designated Consultants for MAPPA
(who are consultant forensic mental
health clinicians). The aim of the
NHS Lothian structure and input is to
provide governance for NHS Lothian’s
contribution to Public Protection  and
to ensure that health issues (including
mental health, physical health, staff and
patient safety, information sharing) that
arise in relation to MAPPA cases are
dealt with appropriately. The Director
of Public Protection attends all level
3 MAPPA meetings; The NHS Lothian
Serious Offender Liaison Service (SOLS)
representatives attend all level 2 and level
3 MAPPA meetings; and the Health Liaison
Officer attends all level 2 and some level 3
MAPPA meetings.
The NHS Lothian Serious Offender
Liaison Service (SOLS) continues
to provide specialist clinical
consultation, training, assessment
and clinical supervision to
support the management
of serious violent and
sexual offenders being
managed in the
community.
Page 79 of 238

Page 80

2022-2023
\10
During the reporting year SOLS
completed 26 case discussions with
frontline staff from social work and
police responsible for the management
of the individual concerned. There were
31 referrals to their service by social
work and police, which led to 23 risk
assessments being completed on those
individuals deemed to present a serious
risk of harm to the public.
NHS Borders also makes an important
contribution to MAPPA. NHS Borders
continues to work collaboratively with
MAPPA partners to ensure appropriate,
relevant and proportionate responses to
information sharing requests to support
the management and assessment of risk.
The Single Point of Contact (SPOC), with
operational responsibility for dealing with
MAPPA health information requests is the
Nurse Consultant Public Protection or a
member of the NHSB Public Protection
Nursing Team. MAPPA level two meetings
are attended by a representative from
the NHSB Public Protection Nursing
Team. There may also be representation
provided from the Learning Disability
Forensic Team and/or Mental Health
Psychology services dependent on
whether this is a concern relative to
a learning disability, mental illness or
addiction. MAPPA level three meetings
will be attended by NHSB Strategic Lead
and/or Nurse Consultant for Public
Protection. NHSB Chief Executive and
Nursing Director will be made aware
of these meetings and will be asked to
attend where appropriate.
Community Intervention Services for
Sex Offenders (CISSO)
This service continues to support partner
agencies in the risk management of
people with sexual convictions through
the delivery of community-based group
treatment programmes and individual
interventions, addressing the behaviour
and attitudes associated with sexual
offending. In addition, staff provide
assessments and offer advice and
consultation to criminal justice social
workers in Edinburgh, the Lothians, and
Scottish Borders.
CISSO received 101-referrals in 2022/23,
which resulted in 70-people receiving
a service. We continue to see clients
in West Lothian, one-day a fortnight
and have reintroduced the “CISSO link
person”, where a CISSO worker regularly
bases themselves in a locality office, to
see clients and speak to staff, in East
Lothian, Scottish Borders and Midlothian.
Group-based interventions are delivered
from our Grindlay Street Court offices in
Edinburgh.
Pending the planned national roll-out
of Moving Forwards 2 Change (MF2C)
in 2024, CISSO has continued to
deliver its forerunner, Moving
Forwards Making Changes
(MFMC), including an adapted
MFMC group for men with
enhanced learning needs.
Page 80 of 238

Page 81

2022-2023
\11
Other group-based programmes delivered
include lower-intensity interventions for
men whose offending was technology
mediated, as well as Survive and Thrive,
for men with interpersonal trauma. This
is a psychoeducational intervention,
looking at increasing understanding of
how past interpersonal trauma can impact
on current functioning and practical
strategies to help people to manage this
impact more effectively.
CISSO has also supported Edinburgh’s
involvement in the pilot of a risk
assessment framework for men who
have been convicted of offences relating
to Indecent Images of Children. Further
information about this pilot is available on
the Risk Management Authority website.
Another development has been the
training of CISSO staff in the Static-99R
risk assessment tool, as part of a small
Community Justice Scotland-led test for
change in the event that there is a need to
replace the Risk Matrix 2000.
CISSO has also continued to support
national training around working with
people with sexual offending. This
Community Justice Scotland coordinated
training takes a tiered approach starting
with the delivery of a 1-day introductory
course (Introduction to Sexually Harmful
Behaviour), which may be followed by
training in specialist risk assessment tools
(the Risk Matrix 2000 / Stable & Acute
2007) as well as MFMC case-manager
/ facilitator training. Training has used
a blended model of online resource
packs, virtual delivery and face-to-face.
It is anticipated that this blended model
of delivery will allow for more flexible
training events in the future.
Keeping Children Safe
The Community Disclosure Scheme
provides that parents, carers and
guardians of children under 18 can ask for
information about a named person who
may have contact with their child if they
are concerned that he or she might have
convictions for sexual offences against
children (e.g. if a parent wants to find out
more about a new partner). Police officers
discuss the concerns of the applicant in
a face-to-face meeting and offer advice
and support.
In this reporting year, police in Edinburgh,
the Lothians and Scottish Borders
received 51 applications under this
scheme.
Further information can be found at:
Sex Offender Community Disclosure
Scheme Form | Police Scotland
Page 81 of 238

Page 82

2022-2023
Edinburgh, the Lothians and
Scottish Borders Multi-Agency
Public Protection Arrangements
\12
Achievements
in Developing
Practice
4
Page 82 of 238

Page 83

2022-2023
\13
Training and Promoting MAPPA
During this reporting year, we have held a
number of multi-agency training events.
During the course of the reporting year,
the MAPPA Co-ordinator facilitated a
peer review process for all managers who
chair Level 2 Meetings. This allowed each
Level 2 Panel member to be reviewed by
the MAPPA Co-ordinator and a fellow
Level 2 chair from another area, but also
involved them in reviewing a colleague,
which allowed them to reflect not only
on their own practice but also the benefit
of having observed a colleague.
In February and March 2023, the
MAPPA Co-ordinator facilitated a series
of workshops across our five local
authority areas for Level 2/3 MAPPA
Panel Members to discuss their role and
responsibilities and to enhance their
understanding of the Multi-Agency Public
Protection Arrangements.
In February 2023, Edinburgh, the Lothians
and Scottish Borders Strategic Oversight
Group commissioned the Keil Centre to
present a training session, with a view
to increase understanding on how we
create a culture within our organisations
that promotes/supports adherence
and compliance to our processes and
procedures. In March 2023, the Keil
Centre presented a training session to
SOG members which provided a positive
learning experience.
On 30 March 2023, Edinburgh, the
Lothians and Scottish Borders Strategic
Oversight Group commissioned the
MAPPA Annual Conference. The event
was attended by staff and managers from
all agencies involved in the management
of registered sex offenders.
The morning session was delivered by
Dr Katharine Russell, Consultant Clinical
Psychologist, NHS Lothian and focused
of risk assessment from analysis to
communication. The afternoon session
was delivered by Gillian Walker, Deputy
Governor, HMP Edinburgh and focused
on the role of the multidisciplinary
Risk Management Team, the decision
making body for agreeing progression
to less secure conditions or community
access. The final session was delivered
by Dr Jamie Kirkland, Consultant Clinical
Psychologist, NHS Lothian and focused
on offenders with intellectual disabilities. 
This event was well attended and very
positive feedback was received.
Page 83 of 238

Page 84

2022-2023
\14
Developing the use of remote electronic
monitoring equipment
Due to advance in technology the
internet can be accessed through a
variety of devices. The monitoring
of devices is the responsibility of the
‘responsible authority’. Where the Parole
Board or Court have granted a condition
or requirement to monitor an offender’s
electronic devices for example within a
Community Payback Order or a Sexual
Offences Prevention Order, then remote
electronic monitoring of their internet
enable devices can be considered.
eSafe is a managed monitoring service
that tracks the individual’s use of their I.T.
devices to detect signs of inappropriate
and/or criminal behaviour. eSafe is only
deployed in cases where it is an agreed
strategy of the risk management plan.
In all cases, installation and monitoring
are undertaken with the knowledge of
the offender. Where there is an initial
detection of a potential offence or breach
of the order then the lead agency will be
informed.
If there are concerns relative to imminent
or ongoing contact offending or any
concerns relative to a suicide risk or
serious self-harm, eSafe will notify the
police via the 999 system.
Police Scotland and all five local
authorities within the Edinburgh, the
Lothians and Scottish Borders are
developing their use of remote electronic
monitoring software.
Developing the use of Sexual Offences
Prevention Orders (SOPO)
The SOPO is an order granted by
the Court. It places conditions on an
offender’s behaviour, provides a power
of arrest if breached and enhances the
police role in managing such offenders.
SOPOs could initially only contain
prohibitive measures, however, a change
in legislation in November 2011 allows
for these orders to contain positive
obligations as well as prohibitions.
For some offenders, the existence of a
SOPO is enough to provide structure to
their daily life, through which they may
avoid further offending. On 31 March
2023, there were 81 SOPOs in place
in our area. 
Page 84 of 238

Page 85

2022-2023
Edinburgh, the Lothians and
Scottish Borders Multi-Agency
Public Protection Arrangements
\15
5
Strategic
Overview
Arrangements
Page 85 of 238

Page 86

2022-2023
\16
Edinburgh, the Lothians and Scottish
Borders – Strategic Oversight Group
This group is responsible for the overview
and co-ordination of the Multi-Agency
Public Protection Arrangements, ensuring
the sharing of best practice and learning
from significant case reviews. The
group also provides a strategic lead for
developing local multi-agency policy and
strategy in relation to shared priorities
regarding the management of offenders.
Edinburgh, the Lothians and Scottish
Borders – MAPPA Operational Group
This multi-agency operational group
supports the work of the Strategic
Oversight Group. Its remit is to share
learning, develop best practice and
ensure consistency of practice.
Local Offender Management/MAPPA
Committees
These local committees monitor
the performance and quality of local
service delivery; they provide strategic
direction to local member agencies; and
develop local policy and practice. These
committees include representatives from
all key agencies, a number of whom are
also members of the local child and adult
protection committees, ensuring effective
communication across public protection.
These local committees report to their
respective Chief Officer Groups within
their local authority area.
NHS Lothian Public Protection Action
Group (PPAG)
The main aim of this group is to ensure
NHS Lothian discharges its responsibilities
for Public Protection including MAPPA,
This group provides a general forum
to discuss important practice issues, in
addition to developing good practice in
relation to the management of high-risk
offenders in the health care setting. PPAG
reports to the NHS Board through the
Healthcare Governance Committee.
Page 86 of 238

Page 87

2022-2023
Edinburgh, the Lothians and
Scottish Borders Multi-Agency
Public Protection Arrangements
\17
6
Statistical
Information
Unless stated, the statistics recorded are
for the reporting period 1 April 2022 to
31 March 2023
Page 87 of 238

Page 88

2022-2023
\18
Table 1: General    
REGISTERED SEX
OFFENDERS (RSO’s) No.
a) Number of:
I. at liberty and living in the area
on 31 March
780
a) Number of:
II. per 100,000 population on 31
March
76
b) The number having a
notification requirement who
were reported for breaches of
the requirements to notify
36
Table 2: Civil Orders applied and
granted in relation to registered sex
offenders
THE NUMBER OF No.
a) Sexual Offences Prevention
Orders (SOPOs) in force on 
31 March
81
b) SOPO’S granted by courts
between 1 April and 31 March 26
c) Risk of Sexual Harm Orders
(RSHOs) in force on 31 March 1
d) Sexual Harm Prevention
Orders (SHPOs) in force on 31
March
35
e) SHPOs granted by courts
between 1 April and 31 March 8
f) Sexual Risk Orders (SROs) in
force on 31 March 0
g) Foreign Travel Orders imposed
by the courts between 1 April
and 31 March
0
h) Notification Orders imposed
by the courts between 1 April
and 31 March
2
Table 3:  Registered sex offenders by
level, re-convictions and notifications    
REGISTERED SEX OFFENDERS
(RSO’s) No.
a) Number of RSOs managed by
MAPPA level as at 31 March: 780
I. MAPPA Level 1 767
II. MAPPA Level 2 13
III. MAPPP Level 3 0
b) Number of Registered Sex
Offenders convicted of a further
group 1 or 2 crime between 1st
April and 31st March:
25
c) Number of RSO’s returned
to custody for a breach of
statutory conditions between
1 April and 31 March (including
those returned to custody
because of a conviction for a
group 1 or 2 crime):
19
d) Number of individuals subject
to the SONR indefinite period
review process (under the
terms of the Sexual Offences
Act 2003 (Remedial) (Scotland)
Order 2011) between 1 April
and 31 March:
34
e) Number of notification
continuation orders issued for
individuals subject to SONR for
an indefinite period (under the
terms of the Sexual Offences
Act 2003 (Remedial) (Scotland)
Order 2011) between 1 April and
31 March:
26
f) Number of RSO’s subject to
formal disclosure: 12
Page 88 of 238

Page 89

2022-2023
\19
Table 4: Restricted Patients
RESTRICTED PATIENTS (RP’s): No.
1) Number of RP’s
a) The Health Board(s) in
your MAPPA region had
responsibility for on 31 March
2023
49
b) The Health Board(s) in
your MAPPA region had
responsibility for during the
reporting year (1 April 2022 to
31 March 2023)
50
2) Number within hospital/
community as at 31 March: 
a) State Hospital
9
b) Other hospital in your area: 27
c) Community 
(conditional discharge) 13
3) Number managed by MAPPA
Level as at 31 March 
1) MAPPA Level 1
49
2) MAPPA Level 2 0
3) MAPPA Level 3 0
4) Number of RP’s recalled by
Scottish Ministers during the
reporting year 
0
Table 5: Statistical Information – 
other serious risk of harm offenders    
SERIOUS RISK OF HARM
OFFENDERS:
No.
a) Number of offenders managed
by MAPPA level as at 31 March:
1) MAPPA Level 2:
2
2) MAPPA Level 3: 0
b) Number of offenders convicted
of a further Group 1 or 2 crime:
1) MAPPA Level 2:
0
2) MAPPA Level 3: 0
c) Number of offenders returned
to custody for a breach of
statutory conditions (including
those returned to custody
because of a conviction of
Group 1 or 2 crime)
6
d) Number of notifications made
to DWP under the terms of
the Management of Offenders
etc. (Scotland) Act, 2005
(Disclosure of Information)
Order 2010 between 1 April
and 31 March
2
Table 6: Registered sex offenders managed in the
community under statutory conditions and/or notification
requirements on 31 March 2022
CONDITIONS NUMBER PERCENTAGE %
On statutory supervision 250 32.05
Subject to notification
requirements only 530 67.95
Page 89 of 238

Page 90

2022-2023
12524-23-AR
Edinburgh, the Lothians and
Scottish Borders Multi-Agency
Public Protection Arrangements
COUNCIL
Partners:
NHS Border
NHS Lothian
Scottish Prison Service
Midlothain Council
East Lothian Council
West Lothian Council
Edinburgh Council
Scottish Borders Council
Police Scotland
Page 90 of 238

Page 91

Multi-Agency Public
Protection Arrangements
(MAPPA) in Scotland:
National Overview Report 2022-2023
October 2023 Page 91 of 238

Page 92

2 
Contents 
1.   Background .......................................................................................................... 3
2.   Justice Policy Context .......................................................................................... 4
3.   National MAPPA Developments ........................................................................... 4
4.   Risk Management Authority ................................................................................. 7
5.   The Scottish Prison Service (SPS) ....................................................................... 8
6.   Health ................................................................................................................. 11
7.   Police Scotland................................................................................................... 12
8.   Sex Offender Community Disclosure Scheme (Keeping Children Safe) ............ 13
9.   Social Work Scotland ......................................................................................... 13
10. Social Security Scotland ..................................................................................... 14
Appendix A: Geographical MAPPA Region Model for Scotland ............................... 16
Appendix B: MAPPA Website Addresses ................................................................. 17
Appendix C: MAPPA National Data.......................................................................... 19 
Page 92 of 238

Page 93

3 
Multi-Agency Public Protection Arrangements (MAPPA) in Scotland: National
Overview Report 2022-2023
1.   Background 
The Multi-Agency Public Protection Arrangements (MAPPA), are a set of statutory
partnership working arrangements introduced in 2007 under Section 10 of the
Management of Offenders etc. (Scotland) Act 2005 (the 2005 Act). 
The purpose of MAPPA is the protection of the public and the reduction of serious
harm.  In Scotland MAPPA brings together the Police, Scottish Prison Service (SPS),
Health Boards and the Local Authorities in partnership as the Responsible
Authorities, to assess and manage the risk posed by certain categories of offender: 
• Sex offenders who are subject to notification requirements under the Sexual
Offences Act 2003; 
• Mentally disordered restricted patients; and 
• Other individuals who by reason of their conviction are assessed by the
Responsible Authorities as posing a risk of serious harm to the public. 
A number of other agencies have a ‘Duty to Cooperate’ (DTC) with the Responsible
Authorities, including housing providers, the voluntary sector, Social Security
Scotland and the Children's Reporter. 
The operation of MAPPA in Scotland is supported by National Guidance1 and
procedures.  There are ten MAPPA regions in Scotland (Appendix A) and each
region is overseen by a Strategic Oversight Group (SOG) consisting of senior
representatives from each of the Responsible Authorities.  In each MAPPA region
the SOG meets regularly and monitors and reviews how the MAPPA arrangements
are working.   
The MAPPA National Strategic Group is responsible for the strategic oversight and
development of MAPPA.  It is chaired by the Scottish Government and includes the
10 MAPPA SOG Chairs and representatives from the Responsible Authorities.   
Responsible Authorities fulfil their statutory duties in part by jointly preparing and
publishing their own local MAPPA annual reports.  Each of these can be viewed on
Local Authority websites, links to which are included at Appendix B. 
This report covers the period from 1 April 2022 to 31 March 2023, the sixteenth year
of MAPPA in operation in Scotland and provides an overview of the main national
developments as a result of work conducted by the Scottish Government and its
partners.  The report comprises a range of contributions from each of the
Responsible Authorities, which outlines the progress made in respect to MAPPA
during the reporting period, and includes details of ongoing work and future plans. 
1 Scottish Government Multi-Agency Public Protection Arrangements (MAPPA): National Guidance
(www.gov.scot)
Page 93 of 238

Page 94

4 
There are a number of statistics on Registered Sex Offenders included in the report
(Appendix C) which have been extracted from the ViSOR (Violent and Sex Offender
Register) database.  These figures provide a snapshot as at 31 March 2023.   
2.   Justice Policy Context 
The Scottish Government in its Programme for Government (2023 to 2024)2 sets out
its three connected core missions which are: 
(i) Equality – tackling poverty and protecting people from harm; 
(ii) Opportunity – a fair, green and growing economy; and 
(iii) Communities – prioritising our public services.   
The ambition of protecting people from harm underscores the Government’s
commitment to prioritising the safety and security of the people of Scotland.  The
Cabinet Secretary for Justice and Home Affairs emphasises that this is her clear
priority and that genuine equality and opportunity are dependent on ensuring we live
in a just, safe, and resilient Scotland where everyone can reach their potential and
contribute fully to society.   
The Government’s vision for reforming the Justice system to ensure that victims and
witnesses are treated compassionately and that a trauma informed approach is
applied, is combined with its commitment to ensuring effective public protection
approaches to managing those individuals who commit the most serious violent and
sexual offences.  Focusing on rehabilitation both in custody and in the community is
the best way to reduce offending and make our communities safer.  Delivery of the
National Community Justice Strategy3 contributes to the achievement of those aims
as does the continued application of Multi-Agency Public Protection Arrangements
designed to assess, manage and minimise the potential risks posed by the most
serious offenders through collaborative working.   
3.   National MAPPA Developments 
Nationally MAPPA has seen a number of developments in the past 12 months and
work continues to deliver future improvements to the multi-agency working
arrangements.  A summary of the work over the reporting period includes: 
MAPPS Development 
As part of supporting joint working across the UK for the purposes of public protection, the
Home Office is developing an enhanced system to replace the existing ViSOR
system in conjunction with UK partners (including Scotland’s MAPPA Responsible
Authorities).  It will be called the Multi-Agency Public Protection System (MAPPS).   
Once introduced, MAPPS will enhance existing public protection partnerships as well
as delivering wider public protection benefits and MAPPA benefits including accurate                                            
2 Programme for Government 2023 to 2024 - gov.scot (www.gov.scot)
3 National Strategy for Community Justice - gov.scot (www.gov.scot)
Page 94 of 238

Page 95

5 
and timely sign-posting between all Responsible Authorities of those managed under
MAPPA and greater facilitation of cross-border information sharing.   
For the period of this MAPPA annual overview report, the UK Government (UKG)
MAPPS Programme led 10 multi-agency MAPPS specific groups/committees – listed
below.  Scottish MAPPA Responsible Authorities have contributed and supported the
development of the process not least by their representation across all 10 Groups,
listed below:   
• Executive Committee 
• Steering Committee
• National Data Controllers Group
• Executive Training Group
• Innovation, Technology and Security Group
• Operational Training Group (closed 9 March 2023 and replaced with 1-2-1
sessions)
• Business Standards Group
• Product Owners Working Group
• Operational Users Group
• Scottish Users Group 
In addition to this, a specific Scottish Government (SG) led Scottish MAPPS Group
evolved from earlier discussions led by SG on multi-agency information sharing. 
This Group met initially in February 2023 with an original aim to provide a forum to
discuss Scottish specific aspects of the UKG led MAPPS Groups.  It also aimed to
help collate and connect the work of the Groups for Scottish representatives to
discuss and disseminate.   In addition, and where necessary, the Group sought to
agree a Scottish position on issues to be fed back into MAPPS governance
(particularly to the Executive Committee which provides sign-off on MAPPS
Programme key decisions). 
Scottish partners continue to work closely with UKG, and a further update will be
provided in the next reporting period. 
MAPPA and Terrorism 
Individuals convicted of terrorism and terrorism-related offences can be managed
under the MAPPA framework where they meet the relevant criteria relating to the
level of risk of serious harm they present to the public.   
The Scottish Government chaired MAPPA Development Group continues to work
with the Responsible Authorities in considering the existing and future role of
MAPPA in the risk assessment and risk management arrangements for individuals
convicted of terrorism and terrorism-related offences.   
For the period of this report, work has focussed on improving connections between
terrorism policy and MAPPA, including considering case studies and exploring the
need for updates to tools and/or guidance.   
Page 95 of 238

Page 96

6 
The Scottish CONTEST Delivery Group, chaired by the Deputy Chief Constable, is
responsible for oversight of the delivery of the CONTEST Strategy4 (the UK
Government’s Counter-Terrorism Strategy) in Scotland.  The MAPPA Development
Group was tasked with exploring specific questions for the Scottish CONTEST
Delivery Group in relation to links to MAPPA.  An update was provided to the
Scottish CONTEST Delivery Group in February.  Work continues on the
development of a bespoke chapter of the MAPPA National Guidance covering
MAPPA and terrorism offending.   
Moving Forward 2 Change (MF2C) 
The Moving Forward: Making Changes (MF:MC) programme was designed jointly by
the Scottish Prison Service and the Community Justice Division of the Scottish
Government, with the aim of reducing the risk of sexual offending recidivism. 
National programmes are one of the suite of tools available as part of a rounded
approach to protection interventions which align with the Scottish Government’s
focus on reducing reoffending and rehabilitating offenders, while at the same time
protecting the public.   
The programme was introduced in Scotland in 2014 following accreditation by the
Scottish Advisory Panel on Offender Rehabilitation (SAPOR) and though
accreditation has now lapsed there was agreement amongst partners that the
programme should continue to be delivered to accredited standards.  A National
Advisory Board, set up in May 2019, unanimously concluded that a revision (not a
replacement) of the programme was required.  The re-designed programme, called
Moving Forward 2 Change (MF2C), reflects a developing evidence base, advice
from SAPOR, evaluation recommendations5, and stakeholder consultations.   
The pilot of MF2C launched on 1 July 2022 in two custodial sites – HMP Edinburgh,
and HMP Barlinnie; and three community sites – East Renfrewshire, East
Dunbartonshire and North Lanarkshire.  There is a regular reporting requirement to
the National Design Lead to ensure the safety of the staff and participants.  Where
feedback indicates any risk of harm to either a participant or staff member, the
Steering Group will be convened and make a recommendation of how to manage
that risk.   
Changes will be made as necessary (and with approval of the MF2C Steering
Group) to ensure that the pilot participants receive an appropriate level of service
and that the pilots inform the ongoing development of MF2C. 
The initial design phase of the project will be completed by the end of 2023 and it is
hoped that the roll out and accreditation process will begin in 2024.  MF2C interim
training is being delivered (September – November 2023) so that pilot sites can
continue to deliver MF2C.  All MF:MC sites were offered critical needs training
should they be unable to continue delivery until MF2C is rolled out.  Critical need
sites will also be included in the MF2C interim training.                                              
4 CONTEST Strategy 2023
5 Moving Forward: Making Changes - An Evaluation of a Group-based Treatment Programme for Sex
Offenders (www.gov.scot) 
Page 96 of 238

Page 97

7 
New Behavioural Orders 
On the 31 March 2023 sections 10 to 40 of the Abusive Behaviour and Sexual Harm
(Scotland) Act 2016 (“the 2016 Act”) came into force.   
These sections introduced two preventative orders which can be applied to relevant
sex offenders and those who pose a risk of harm: Sexual Harm Prevention Orders
(SHPOs), and Sexual Risk Orders (SROs) respectively.  These new orders replaced
Sexual Offences Prevention Orders (SOPOs), Foreign Travel Orders (FTOs) and
Risk of Sexual Harm Orders (RSHOs).   
The new orders are designed to protect the public from sexual harm and contain a
lower threshold than the previous orders.  For instance, they can be used to manage
risk to vulnerable adults, as well as children, protecting them from sexual harm
outside of the UK.  Also, their remit is wider, enabling, for example, foreign travel
restrictions to be applied under either type of order.  
4.   Risk Management Authority 
The Risk Management Authority (RMA) continues to work to protect the public by
reducing the risk of serious harm posed by violent and sexual offending.  It does this
through ensuring that effective, evidence-based risk assessment and risk
management practices are in place in Scotland.  Collaboration is essential to this
work and in 2022-23 the RMA has maintained its close engagement with partner
agencies to deliver and progress key business objectives.   
The RMA Business Plan for 2023-24 can be found here. 
Education and Training 
In 2022-23 the RMA worked with community partners to identify areas of training
need to help improve understanding of the Order for Lifelong Restriction (OLR)
sentence.  Over the same period, the RMA delivered five risk practice courses to
justice social workers and to 85 Police Scotland colleagues at a single large-scale
event.  The RMA also facilitated bespoke training and awareness sessions relating
to risk assessment and risk management with Parole Board for Scotland Members
and representatives from Parole Scotland. 
Level of Service/Case Management Inventory (LS/CMI) Review of Closed Cases 
LS/CMI is a comprehensive general offending assessment and case management
planning method.  It is used by all community and prison based justice social work
services in Scotland to aid decisions on the level and focus of intervention with
individuals (aged 16+) who have been involved in offending. 
In March 2022 the RMA were tasked to lead a review of closed6 LS/CMI cases
affected by system errors within the supporting IT infrastructure.  The purpose of this                                            
6 Where a person no longer requires to be assessed or managed by the Justice Social Work service,
the service closes the record (the case) within the LS/CMI system.
Page 97 of 238

Page 98

8 
review was to determine whether errors had any material impact on public safety or
on any of the individuals who had been subject to those assessments.  The multi-
agency review considered 1032 cases and found no evidence that the inaccuracies
led to any material impact.  The report made 12 recommendations relating to Policy,
Practice, Quality Assurance, Training, and the LS/CMI System.  In 2022-23, the
RMA will look to progress and to support others to progress those recommendations. 
In particular, a review of the implementation of the Framework for Risk Assessment,
Management and Evaluation (FRAME) will commence this year.  The Review report
can be found here.   
Internet Offending Assessment Framework 
A two-year pilot of the framework for assessing recidivism risk in those convicted of
possessing indecent images of children was commenced in June 2022 and this work
is ongoing.  The eight local authority pilot areas – South Ayrshire, Glasgow, South
Lanarkshire, Edinburgh, East Lothian and the Tayside Partnership areas of Dundee,
Angus, Perth and Kinross – have received training in the use of the C-PORT &
CASIC assessment tool and have begun assessing individuals.   
First Grant of Temporary Release (FGTR) 
The RMA and the Scottish Prison Service have commenced a four-year pilot in
which RMA staff evaluate risk assessments and risk management plans for certain
life sentence prisoner FGTR applications.  This external secondary assurance
process applies only to complex cases and is intended to support the development
of risk practice, to identify and build upon areas of good practice, and ensure FGTR
decisions are based on high-quality information about risk.   
Counter-Terrorism 
Counter-terrorism remains an area of significant focus for the RMA.  In 2022-23 the
RMA formalised its working arrangements with the Counter-Terrorism Assessment
Rehabilitation Centre (CT-ARC), and also welcomed the Australian Independent
National Security Legislation Monitor (INSLM).  Work with the Prisons Oversight
Group and other justice partners to develop pathways for the assessment and
management of this group of individuals also continues.   
5.   The Scottish Prison Service (SPS) 
The Scottish Prison Service (SPS) is an Executive Agency of the Scottish
Government.  The SPS’s principal objective is to contribute to making Scotland Safer
and Stronger.  It has a duty to protect the public from harm by keeping those who
have been sentenced in safe and secure custody.  Its commitment to public safety is
delivered through constructive engagement with those in its care, focussing on
recovery and reintegration.   
The risk assessment and management of individuals in custody who are subject to
release on licence is carried out in partnership with Local Authority Justice Social
Workers, through an enhanced version of the Integrated Case Management (ICM)
Page 98 of 238

Page 99

9 
process.  A key objective of ICM is to ensure that - along with the Police and other
community justice partners, such as Local Authority Social Work, Housing, and
Children and Families Departments - SPS meets statutory requirements to establish
joint arrangements for assessing and managing the risk posed by individuals subject
to MAPPA, including the sharing of information with community partners.   
Such individuals are risk assessed, using a structured professional judgement
approach informed by a variety of risk assessment tools to determine the
management of the individual whilst in custody, and in preparation for pre-release
planning and release.  For certain individuals, a Psychological Risk Assessment may
be carried out by SPS Forensic Psychologists and used to inform ICM case
conferences and at key points in a person's time in custody, to share information and
inform action plans. 
SPS establishments work in partnership with MAPPA Coordinators, prison and
community-based Justice Social Work Teams and Police Scotland Offender
Management Units.   
SPS is represented on the Scottish Government MAPPA National Strategic Group,
MAPPA Development Group and other short-life working groups, established to
progress the future delivery of MAPPA.  Prison Governors also contribute to and
attend local Strategic Oversight Groups. 
Programme Delivery 
Between April 2022 and March 2023, programme delivery achieved more stability
following the COVID-19 pandemic and relaxation of covid-related practices.  The
following table provides an overview of programme targets and completions from this
delivery period: 
Programme Target Risk Target
Completions7
Number of
Completions
Moving Forward 2
Change (Pilot)
Sexual Offending Pilot8 9
Self-Change
Programme (SCP)
High intensity
Violence 
36  31
Discovery  Moderate Intensity
Violence
56 36
Constructs Problem Solving and
Consequential
Thinking 
56 56
Pathways  Substance Use
connected to
offending behaviour 
48 41                                            
7 SPS set target completions at the beginning of each delivery year based on programmes waiting list
priorities and resources across delivery sites.
8 As a Pilot Programme no targets were set. These can be determined following the pilot period and
confirmation of approximate completion times per participant.  
Page 99 of 238

Page 100

10 
Youth Justice Modular for young
people in custody 
Requirement/
Needs-led
7
Ultimate Self Adult women in
custody 
Requirement/
Needs-led
14
Short-term
intervention
Programme (STIP)
Focus on desistence
for men serving a
short-term prison
sentence 
Requirement/
Needs-led
430 
Programme Developments/Design 
The 2022-23 delivery period also held some positive outcomes in terms of the
MFMC re-design (MF2C).  Pilot programmes are ongoing and evaluation of MF2C
will take place in the lead up to the end of this delivery period.  SPS will continue to
deliver MF2C following the pilot period as the main moderate intensity intervention
for those who have sexually offended.     
The Self-Change Programme (SCP) has also been piloted in HMP Glenochil and
HMP Edinburgh with some re-design updates.  SCP continues to be delivered in
HMP Shotts and HMP Low Moss.   
In the April 2023-March 2024 delivery period, evaluations of both MF2C and SCP will
be complete and subsequently the programme materials will be presented to
SAPOR for accreditation. 
With the opening of HMP Stirling, a version of the Short Term Intervention
Programme (STIP) has also been developed for female prisoners who have short-
term sentences (F-STIP).  Implementation of this is ongoing, with staff training being
a requirement for this to progress.   
Resource and Delivery Focus 
Across some SPS sites there are at times requirements for Programmes Officers to
be redeployed into other operational roles.  This has some impact on the programme
delivery, with each site managing this locally.  In line with previous years,
completions have also been impacted by staff turnover, which in turn has an impact
on training requirements.  This continues to be managed via the national training
plan, Programme Manager meetings and centrally within HQ.   
The Psychology function is responsible for the Treatment Management of high
intensity programmes as well as training delivery for programmes.  Due to the
difficulties in recruiting and retaining qualified psychologists, the training schedule
has been reduced for critical requirements only.  This has been planned in order to
have minimal impact on national programme delivery plans.   
Future Focus 
SPS remains cognisant of the needs of the population of individuals who are
awaiting offending behaviour programmes.  Each year the National Waiting Lists are
reviewed to inform delivery.  As such, high intensity programmes will continue to be
Page 100 of 238

Page 101

11 
an area of focus.   For the SCP, there is additional staff training planned to allow this
programme to also be delivered in HMP Perth within the April 2023-March 2024
delivery period. 
SPS also offers a range of other opportunities and support to people in custody to
help them build their strengths and address their needs in preparation for release. 
Such support is assessed on an individual basis and can include substance misuse
treatment, assistance with mental health, vocational and academic education to
increase job readiness, and support with family matters such as parenting and
relationships. 
6.   Health 
The roles and responsibilities of the NHS within the MAPPA framework are set out in
the Management of Offenders etc. (Scotland) Act 2005.   
On 31 March 2022 there were 304 restricted patients recorded on ViSOR as being
managed under the MAPPA process in Scotland.  Work began last year on the
collation of restricted patients’ data nationally for annual reporting purposes with a
view to ensuring that what is provided is meaningful and robust.   
The Scottish Government continues to provide funding to the Forensic Mental Health
Services Managed Care Network (the Forensic Network) to support engagement by 
the NHS with MAPPA.  The Forensic Network, through the Lead for Serious and 
Violent Offenders, supports the NHS MAPPA work in a number of ways.  These 
include: attendance at National Strategic meetings on behalf of Health, for example,
those related to MAPPS and information sharing processes; chairing regular
meetings with MAPPA Health liaison colleagues to share good practice; and
undertaking specific MAPPA related pieces of work. 
The Forensic Network also supports the MAPPA Clinical Forum, an annual 
practitioner forum which has the objectives of “Networking, Education, Operations 
and Policy”.  The forum provides a vehicle for services to consider areas within 
MAPPA practice that might require guidance and a shared approach, as well as 
providing the opportunity to network and share good practice.   
Work is currently being undertaken to refresh the current picture of key MAPPA
contacts within all Health Boards and strengthen health links across Boards.   
The Independent Review into the Delivery of Forensic Mental Health Services 
The Independent Review into the Delivery of Forensic Mental Health Services
chaired by Derek Barron published its final report in February 2021.  The Review 
made a number of recommendations, which, if taken forward will have implications 
for MAPPA partners.  One MAPPA specific recommendation is for the Scottish 
Government to consider the development of a more consistent way of sharing 
forensic mental health expertise with MAPPA partners and other external individuals 
or organisations (including other NHS services) across the country, citing the NHS 
Lothian Serious Offender Liaison Services and NHS Greater Glasgow and Clyde 
Page 101 of 238

Page 102

12 
STAR services as potential models for this.  The Forensic Network, in conjunction
with the Scottish Government, has commenced work on this.  The proposed model
of service, which aims to facilitate the provision of advice and support to MAPPA
partners in a more consistent way across the country, is being taken forward by NHS
Lothian with support provided by the Forensic Network.   
Scottish Government continues to progress a programme of work to deliver the
commitments made in response to the Review, aligning with the finalisation of the
Mental Health and Wellbeing Delivery Plan.  Following this, consideration will be
given to communicating the planned next steps for this work to key stakeholders. 
7.   Police Scotland 
Police Scotland works in partnership with other Responsible Authorities and DTC 
Agencies to provide effective and efficient policing of Registered Sex Offenders
(RSOs) and Other Risk of Serious Harm individuals in pursuance of overall MAPPA
management.  This is achieved through consistent practice, enhancing and
developing new and existing partnerships to manage the inherent risks and
challenges posed by these individuals.   
Recognising the critical role of lawful, effective and efficient information sharing,
Police Scotland has supported the Home Office and SG in the development of
MAPPS, promoting its use in Scotland as the platform for the secure storage and
sharing of information between MAPPA Responsible Authorities. 
Police Scotland has continued to engage with the SG and MAPPA partners seeking
the development of a modern, fit for purpose, MAPPA communication strategy to
build community confidence through promotion of the ongoing work of Responsible
Authorities and DTC agencies. 
In pursuance of continual professional development, Police Scotland’s National Sex
Offender Policing Unit has assessed recent Home Office commissioned academic
research on offender profiles and behaviours in England and Wales, identifying
changing demands and learning opportunities to develop ongoing Sex Offender
Policing practices. 
Police Scotland remains engaged with SG to develop appropriate legislation to best
serve MAPPA objectives and protect communities of Scotland from current and
future risks.   
Page 102 of 238

Page 103

13 
8.   Sex Offender Community Disclosure Scheme (Keeping Children Safe) 
The Sex Offender Community Disclosure Scheme (Keeping Children Safe) was
introduced across Scotland in 2011 and is managed by Police Scotland. 
The scheme enables parents, carers or guardians to make a formal request for
information about a named person who may have contact with their child if they are
concerned that the person may be a risk to their child's safety and wellbeing. 
For the year 2022-2023, Police Scotland received a total of 349 applications, an
increase of 11 from the previous year.  Online submission was the most common
method of application with 330 received this way – an increase of 26 from the
previous business year.   
Each application submitted is carefully reviewed and risk assessed by specialist
officers, including consideration of whether there is material to disclose.  These
processes help ensure potentially direct or indirect risks towards children are
identified quickly and progressed by Police Scotland.  Of the 349 applications
received, a total of 14 progressed for disclosure, 3 of which were in relation to
concerns around an RSO. 
The scheme remains a proactive tool for protecting children, providing a clear access
route for the public to raise potential child protection concerns and allowing
parents/carers to take informed action to safeguard their children or indeed providing
parents/carers with reassurance.
9.   Social Work Scotland 
Social Work Scotland is the professional body for social work leaders, working
closely with partners to shape policy and practice, and improve the quality and
experience of social work services.  The local authority is the Responsible Authority
with primary responsibility for the management of individuals subject to statutory
supervision in the community.  This responsibility for the joint arrangements within a
local authority lies primarily with the Chief Social Work Officer.  However, other local
authority services, such as housing, education and children and families, also have
key duties in relation to this function.   
As a Responsible Authority, the local authority is a key member of MAPPA Strategic
Oversight Groups and contributes to significant case reviews and the implementation
of any related recommendations pertaining to practice or adherence to legislation
and guidance.  The local authority is also a key member of local Public Protection
Chief Officer Groups, and Social Work Scotland is represented on the SG MAPPA
National Strategic Group by the Chair of the Justice Standing Committee.  The
management of the vast majority of RSOs is Police led for the purposes of MAPPA,
however justice social work supervises and manages significant numbers of RSOs
managed at MAPPA risk Levels 1 and 2 who are subject to community payback
orders and licences following release from prison.  This requires having a capable,
well-trained workforce in order to manage this range of individuals. 
Page 103 of 238

Page 104

14 
Local authorities are also the lead Responsible Authority for MAPPA Category 3,
Other Risk of Serious Harm Individuals.  This includes people who are not required
to comply with the Sex Offender Notification Requirements and who are assessed by
the Responsible Authorities as posing a high or very high risk of serious harm to the
public (for example, people convicted of serious violent and domestic abuse related
offences).  As with RSOs, the local authority is responsible for holding the
community payback order or licence and for taking action to initiate breach
proceedings with the court or the Parole Board where a person has breached their
order or licence.  This involves monitoring, management and targeted intervention to
address offending and prevention of further offending.  In certain cases, this will
require recommending immediate recall to prison where there is an imminent risk of
serious harm. 
During 2022-2023, Justice Social Work has continued to:
• work in collaboration with other Responsible Authorities and DTC agencies to
ensure the protection of the public;
• provide criminal justice social work reports and risk assessments to inform the
court sentencing process;
• provide a throughcare service to prisoners released on statutory supervision
including ongoing risk assessment, developing risk management plans,
contributing to the Scottish Prison Service’s enhanced Integrated Case
Management (ICM) process and providing reports to the Parole Board for
Scotland;
• deliver programmes to address sexual offending to individuals subject to
community payback orders and licences in the community.
Justice social work professionals are also involved in contributing to the design,
testing and training of the new MF2C programme.  There are three local authorities
piloting the new programme.  This includes developing the intervention on release
for those who have offended sexually and are assessed as highest risk and have
undertaken the self-change programme in custody.   
Social Work Scotland has been involved with local and UK partners in the
development of the MAPPS programme.  Ongoing work and further development will
be required prior to the gradual implementation of the system, from October 2025. 
10.   Social Security Scotland 
On 8 January 2021, the Management of Offenders etc. (Scotland) Act 2005
(Specification of Persons) Amendment Order 2020 came into force.  The 2020 Order
amended the Management of Offenders etc. (Scotland) Act 2005 (Specification of
Persons) Order 2007 to include Social Security Scotland as a DTC agency under the
terms of the 2005 Act and this Order provides for the exchange of certain prescribed
information for those individuals subject to MAPPA. 
Since becoming a DTC agency on 8 January 2021, Social Security Scotland has
shared appropriate information to manage the risk posed by individuals subject to
MAPPA for the protection of the public.   
Page 104 of 238

Page 105

15 
Over the course of the last year, Social Security Scotland continued to develop
relationships with the Responsible Authorities.  They have informed the appropriate
stakeholders of the new benefits they administer by corresponding directly with all
Responsible Authorities via email and face to face sessions.  This ensures they
continue to receive notifications regarding individuals subject to MAPPA.   
They have continued to support the learning and development opportunities for the
teams involved in MAPPA activity and updating guidance where appropriate.  Over
the next 12 months Social Security Scotland aims to develop further its relationships
throughout the MAPPA network to continue meeting their DTC responsibilities.  
Page 105 of 238

Page 106

16 
Appendix A: Geographical MAPPA Region Model for Scotland 
Page 106 of 238

Page 107

17 
Appendix B: MAPPA Website Addresses 
Edinburgh, the Lothians and Scottish Borders
www.edinburgh.gov.uk 
www.midlothian.gov.uk 
www.westlothian.gov.uk 
www.eastlothian.gov.uk/mappa
www.scotborders.gov.uk/MAPPAreport 
Fife
Homepage | Fife Council 
Forth Valley
Home | Stirling Council
www.clacks.gov.uk/community/ccjp/
www.falkirk.gov.uk/services/people-communities/community-justice.aspx 
Glasgow
Homepage of Glasgow City Council - Glasgow City Council 
Grampian
http://www.ouraberdeenshire.org.uk/our-priorities/aberdeenshire-community-justice-
partnership/mappa/
www.aberdeencity.gov.uk
Moray Council - Moray Council 
Highlands and Islands
www.orkney.gov.uk/Service-Directory/S/criminal-justice-team.htm#MultiAgency
Shetland Islands Council – Shetland Islands Council
www.highland.gov.uk
CnES Web (cne-siar.gov.uk) 
Lanarkshire
www.northlanarkshire.gov.uk/ 
www.southlanarkshire.gov.uk/ 
North Strathclyde
www.argyll-bute.gov.uk       
www.eastdunbarton.gov.uk 
www.eastrenfrewshire.gov.uk 
www.inverclyde.gov.uk 
www.renfrewshire.gov.uk  
www.west-dunbarton.gov.uk 
South West Scotland
Multi Agency Public Protection Arrangements - Dumfries and Galloway Council
(dumgal.gov.uk)
www.south-ayrshire.gov.uk
www.north-ayrshire.gov.uk
www.east-ayrshire.gov.uk
Page 107 of 238

Page 108

18 
Tayside
www.Angus.gov.uk 
www.PKC.gov.uk 
www.dundeecity.gov.uk 
Page 108 of 238

Page 109

19 
Appendix C: MAPPA National Data 
This Appendix outlines patterns in information on Registered Sex Offenders (RSOs)
extracted from the ViSOR database on 31 March of each year.  This provides a
snapshot at a point in time. 
Numbers of Registered Sex Offenders in Scotland, 2022 to 2023 
Category  2022 2023
RSOs managed in custody and in the community on 31 March  6,038 6,420
RSOs managed in the community on 31 March  4,520 4,747
RSOs managed at Level 1 in the community on 31 March  4,407 4,584
RSOs managed at Level 2 in the community on 31 March  111 140
RSOs managed at Level 3 in the community on 31 March  2 1
RSOs reported for breaches of notification  374 465
RSOs convicted of a further group 1 or 2 crime9 114 139
RSOs wanted on 31 March  16 13
RSOs missing on 31 March  0 0 
On 31 March 2023, there were 6,420 RSOs in Scotland who were managed in
custody or in the community.  The total number of RSOs has increased by 6%
compared with 2022 when there were 6,038 recorded.   
On 31 March 2023, 74% of RSOs (4,747 RSOs) were being managed in the
community, with the majority of these (4,584 RSOs) being managed at the lowest
MAPPA management level, Level 1.  The remaining RSOs (141) were being
managed at level 2 or level 3. 
In 2022-2023, 93% of RSOs (5,970 RSOs) complied with their notification
requirements under the Sexual Offences Act 2003, compared to 94% (5,664 RSOs)
in 2021-22.  The proportion of RSOs who failed to comply with their notification
requirements has increased to 7%, having been consistently at around 5%-6% for
the previous six years. 
Sex Offender Notification Requirements are robustly policed so that those who
breach their terms are identified at the earliest opportunity.  The RSO can receive a
maximum penalty of 5 years' imprisonment for failing to comply with notification
requirements.                                            
9 Group 1 and 2 crimes - Group 1 relates to non-sexual crimes of violence and group 2 relates to sexual crimes. 
Page 109 of 238

Page 110

20 
The National Statistics on Recorded Crime in Scotland 2022-23  published in June 
2023, illustrated that sexual crimes accounted for 5% of all crimes recorded in
Scotland in 2022-23, as was the case in 2021-22.  The report stated that sexual
crimes recorded by the police in Scotland decreased by 3% from 15,049 in 2021-22
to 14,602 in 2022-23.  Despite this decrease sexual crimes have been on a long-
term upward trend since 1974, with some fluctuations, with historical reporting of
sexual crimes continuing to play a role in this.  As detailed in the report, information
from Police Scotland suggests that just over a fifth (21%) of sexual crimes in 2022-
23 were recorded at least one year after they occurred.  The increase in sexual
cyber-crimes has also had an impact on the trend of recorded sexual crimes over the
past ten years. 
The number of RSOs who have been convicted of a further Group 1 or 2 crime has
increased in the last year (139 in 2022-23 compared to 114 in 2021-22).  These
convictions include offences detected as a result of proactive management and
effective policing by the partner agencies.  When individuals managed under MAPPA
commit further serious offences, the significant case review process examines the
MAPPA policies and processes in place for the management of the individual.  It
identifies areas of learning and good practice and so contributes to continuous
learning to improve future policy and practice. 
Wanted and Missing Registered Sex Offenders: 
A Missing person is defined as anyone whose whereabouts is unknown and: 
• where the circumstances are out of character; or
• the context suggests the person may be subject to crime; or
• the person is at risk of harm to themselves or another. 
Wanted Registered Sex Offenders are defined as those who are subject to the
notification requirements of the Sexual Offences Act 2003 and who have a live
warrant in force. 
On 31 March 2023, of the 13 wanted RSO’s, 11 were assessed as having left the
United Kingdom with no indication that they have returned and 2 were believed to be
within the United Kingdom.  The latest update from Police Scotland provides that of
the 2 RSO’s who were wanted and believed to be within the United Kingdom, one
has since been apprehended and the other has now been assessed as having left
the United Kingdom.  Police Scotland treat all missing and wanted RSOs with the
utmost seriousness and carry out thorough enquiries to trace their whereabouts and
to re-establish the management required to protect the public.  On all occasions a
Senior Investigating Officer of a rank no less than Inspector will be appointed to lead
these investigations.  Up to date figures are available via the Police Scotland
Website. 
Page 110 of 238

Page 111

© Crown copyright 2023
This publication is licensed under the terms of the Open Government Licence v3.0 except
where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-
government-licence/version/3 or write to the Information Policy Team, The National
Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk.
Where we have identified any third party copyright information you will need to
obtain permission from the copyright holders concerned.
This publication is available at www.gov.scot
Any enquiries regarding this publication should be sent to us at
The Scottish Government
St Andrew’s House
Edinburgh
EH1 3DG
ISBN: 978-1-83521-536-4 (web only)
Published by The Scottish Government, October 2023
Produced for The Scottish Government by APS Group Scotland, 21 Tennant Street, Edinburgh EH6 5NA
PPDAS1359202 (10/23)
w w w . g o v . s c o tPage 111 of 238

Page 112

Page 112 of 238

Page 113

Midlothian Council
Tuesday 7 May 2024
Item No 8.6 
Midlothian Local Heat & Energy Efficiency Strategy 
Report by Kevin Anderson, Executive Director Place 
Report for Decision 
1 Recommendations 
Council is recommended to; 
i. Note the progress and programme for the development of the Midlothian Local
Heat and Energy Efficiency Strategy (LHEES) and the next stage for public
engagement with the draft strategy and delivery plan included as Appendices,
and 
ii. Agree to the LHEES Strategy and Delivery Plan as feedback from the Scottish
Government is positive and the Strategy adheres to their requirements. 
2 Purpose of Report/Executive Summary 
2.1     The purpose of this report is to provide an update on The Local Heat & Energy
Efficiency activity and strategy documentation/action plans. 
2.2      The Local Heat and Energy Efficiency Strategy (LHEES) and delivery plan is a
statutory piece of legislation designed to be used as a route map to decarbonise all
of the buildings (domestic and non-domestic) within Midlothian Council’s estate by
assigning energy efficiency and district heating zones. The report provides an update
on the progress in respect to the Midlothian Strategy, the Delivery Plan and next
steps. 
Date:  15 April 2024
Report Contact: Emily Brown, Lead LHEES Officer
emily.brown@midlothian.gov.uk, 
Page 113 of 238

Page 114

2 
3 Background 
3.1 Local Heat and Energy Efficiency Strategies (LHEES) are at the heart of a place
based, locally led and tailored approach to delivering the transition to climate-
friendly, more energy efficient homes and non-domestic buildings. These local
Strategies will set out the long-term plan for decarbonising heat in buildings and
improving their energy efficiency across an entire local authority area. 
3.2      LHEES is primarily driven by Scotland’s statutory targets for greenhouse gas
emissions reduction and fuel poverty: 
• Net zero emissions by 2045 and 75% reduction by 2030.
• In 2040, as far as reasonably possible, no household in Scotland is in fuel poverty. 
3.3 The Council appointed Changeworks in January 2023 to complete the LHEES
Methodology stages 1-4. Followed by the employment of the LHEES Lead Officer to
complete the LHEES Strategy and Delivery Plan, with the first draft required by the
end of December 2023 to comply with the legislative requirement. The draft strategy
and delivery plan is included as Appendix B. 
3.4      This is now subject to approval by Council, following which the final strategy and
action plan will be published and made available publicly. After publication a full
engagement campaign will be undertaken. Officers have been in regular
communication with the Scottish Government as progress in this process. 
3.5     The LHEES details potential Heat Network Zones across Midlothian where there is a
density of properties requiring heat that could form a heat network work in those
areas. In addition, energy efficiency zones have been identified with a focus on those
places where fuel poverty is currently having the greatest impact. Those areas would
be prioritised for area-based schemes. Areas with good potential for heat pumps
have been identified and are also highlighted in the strategy. 
3.6      Overall, Midlothian Council’s LHEES sets out a strategy to provide low carbon heat
that is affordable to as many households and buildings as possible. Driving low cost,
low carbon heat over the expensive and challenging fabric first retrofit approach will
enhance the likelihood of achieving our net zero targets, whilst still abiding by our six
LHEES outcomes. Keeping the focus on making buildings ready for low carbon heat
will allow us to take heat further. This pragmatic approach does not mean that
building fabric and energy efficiency measures are not important; we will still
endeavour to improve our buildings, however due to the cost and disruption
implications seeking to prioritise the fabric first approach then there is a risk that low
carbon heating will never be rolled out at scale, and consequently the risk of missing
decarbonisation targets will be missed. 
Page 114 of 238

Page 115

3 
3.7    Key LHEES Outcomes: 
1. For Midlothian’s communities and property decision makers to be engaged and
empowered to deliver Net Zero heating targets, including making homeowners and
tenants aware of funding and support available to them.
2. Working with Midlothian Energy Limited to find low/zero carbon heat solutions to
meet the Council’s climate change targets.
3. Work to alleviate fuel poverty by bringing forward solutions that move people out of
fuel poverty or prevent them falling further into fuel poverty.
4. Make Midlothian’s homes and buildings as energy efficient as possible using a
fabric first approach.
5. Ensure that Midlothian Council will have an awareness of investment and grant
funding opportunities and seek to secure these opportunities to deliver heat
decarbonisation projects. 
6. Work to whenever possible to create and keep jobs and revenue from heat
decarbonisation projects within the Midlothian economy. 
3.8   Midlothian has 40,000 domestic properties, the majority (73%) were built pre 1984, this
is similar to the national average of (70%). The older housing is typically located in the
smaller mining villages. The tenure profile highlights that the majority (75%) are owner
occupied, 11% council housing and 10% privately rented.        
The main fuel type is gas (89%) and most homes have an Energy Performance
Certificate of C-D level (78%). It is expected that the properties connected to the gas
network will be connected to a District Heating Network in the future. The other
properties that are currently heated by either oil, electricity or Liquified Petroleum Gas
will have to find an alternative solution. The main heat network zones in Midlothian are
Danderhall, Penicuik, Loanhead and Dalkeith. 
3.9      Key actions required within 6 months of LHEES Publication: 
• Conduct Non-Domestic analysis
• Complete Portfolio Energy Assessment Tool (PEAT) analysis
• Complete Building Assessment Reports (BARs) for required MC
owned buildings 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
The LHEES remit is significant and impacts all areas of Council delivery. The LHEES
Lead will facilitate implementation and there will also be a requirement for significant
input from other service areas. Scottish Government have allocated £75k of funding
up to 2027/28. In 2023/24 the Council has £150k of budget (£75k each for 22/23 and
23/24). 
Page 115 of 238

Page 116

4 
There are significant financial, legal and resource implications anticipated for the
Council associated with meeting its LHEES Targets. This is also the case for the
LHEES Delivery Plan which contains several actions that are currently unfunded.
The delivery plan proposes a number of actions all of which will require further
consideration and business case evaluation against the background requirement to
achieve Net Zero by 2040 and the Council’s own commitment to achieve that by
2030. The development of these will be brought forward in conjunction with our joint
venture, Midlothian Energy Limited, there will be costs associated and they may be
substantial however these costs are currently simply unknown at present. Content of
the Delivery Plan will require a full business development case for each proposed
action. 
There is a specific financial ask for planned engagement activities. The LHEES Lead
officer will be undertaking an LHEES engagement campaign in the Summer of 2024
and there will be costs associated with this. It is predicted that there will be £15k p.a.
underspend on the annual Scottish Government grant funding after LHEES Lead
costs have been deducted. Engagement costs can be easily covered within this
figure. 
4.2 Digital 
No digital issues. 
4.3 Risk 
The ‘Local Heat and Energy Efficiency Strategies Order 2022’ was passed by the
Scottish Parliament and has now been made a Scottish Statutory Instrument, coming
into force on 21st May 2022. The order places a duty on Local Authorities to prepare,
publish and update: 
• A local heat and energy efficiency strategy; and
• A local heat and energy efficiency delivery plan. 
The first strategy and plan was required to be published on or before 31st December
2023 and thereafter must be kept under review and updated at intervals of no more
than 5 years of the publication date. 
The draft Strategy and Delivery Plan was completed and submitted to the Scottish
Government before 31st December 2023 for review prior to formal approval by
Council, prior to publication during the first quarter 2024/25. Scottish Government
are aware of this timetable and have not raised any concerns. 
The proposal outlined in this report supports the vision of Midlothian Council; also the                   
Climate Emergency Group and Community Planning Partnership to make significant             
progress towards net zero carbon emissions by 2030. The recent announcement by             
the Scottish Government of the removal of the 2030 target presents a risk to the             
Council’s target and may make the case for a longer timescale to deliver carbon  
Page 116 of 238

Page 117

5 
reductions from available resources. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
The Council is required to have regard to the Equality Act 2010 and the public sector
equality duty (PSED). The PSED places a statutory duty on the Council in the
exercise of its functions to have due regard to the need to: (1) eliminate
discrimination (2) advance equality of opportunity between persons who share a
relevant protected characteristic and persons who do not share it and (3) foster good
relations between persons who share a relevant protected characteristic and
persons who do not share it. 
• Strategic Environmental Assessment is complete – no further work required
• Integrated Impact Assessment has been completed and had sign off in March 2024 
4.5 Additional Report Implications   
Appendices 
Appendix A – Additional Report Implications
Appendix B – Background information/Links 
Page 117 of 238

Page 118

6 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
A.2 Key Drivers for Change
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value
The report does not directly impact on Delivering Best Value 
A.5 Involving Communities and Other Stakeholders
The report does not directly relate to involving communities 
A.6 Impact on Performance and Outcomes
The report does not directly impact on Midlothian Council’s performance and
outcomes 
A.7 Adopting a Preventative Approach
Not applicable 
A.8 Supporting Sustainable Development
Not applicable 
Page 118 of 238

Page 119

1 | P a g e
Draft Local Heat & Energy Efficiency Strategy: Midlothian Council
Date: December 2023 
Page 119 of 238

Page 120

2 | P a g e
Contents
1. Executive Summary ..................................................................................................................... 5
2. Glossary ............................................................................................................................................. 7
2.1 Abbreviations .............................................................................................................................. 7
2.2 Terms .......................................................................................................................................... 7
3 Introduction ...................................................................................................................................... 11
3.1 Overview of LHEES ................................................................................................................. 11
3.2 Scope and Limitations ......................................................................................................... 11
4 Background Information ................................................................................................................. 13
4.1 LHEES Structure ..................................................................................................................... 13
4.2 LHEES Function ...................................................................................................................... 13
4.3 Prioritising LHEES Considerations in a Local Context ................................................................ 14
4.4 Stakeholder Engagement ....................................................................................................... 15
4.5 Local Authority Formalities ..................................................................................................... 16
4.6 Local Authority Progress ........................................................................................................ 16
4.6.1 Local Development Plan (LDP) ...................................................................................... 16
4.6.2 Energy Efficiency Standard for Social Housing (EESSH) .......................................... 17
4.6.3 Local Housing Strategy (LHS) ........................................................................................ 17
4.6.4 Energy Efficient Scotland: Area based Schemes ........................................................ 18
4.6.5 Heat network Activity ....................................................................................................... 18
4.6.6 LHEES Pilot ....................................................................................................................... 19
5 Policy & Strategy Context .............................................................................................................. 20
5.1 National Policy & Strategy ...................................................................................................... 21
5.2.1 Heat in Buildings Strategy ............................................................................................... 22
5.3 Local Policy & Strategy ........................................................................................................... 22
6.4 Resources ............................................................................................................................. 24
6 Baselining - Domestic ..................................................................................................................... 24
6.1 Summary ................................................................................................................................... 26
6.2 Core Indicators ......................................................................................................................... 28
6.2.1 Energy Efficiency .............................................................................................................. 28
6.2.2 Fuel Poverty ...................................................................................................................... 31
6.2.3 Fuel Type ........................................................................................................................... 32
7 Heat Network Zones ....................................................................................................................... 35
7.1 LHEES Analysis ....................................................................................................................... 36
7.1.1 Priority Cluster 1 – Easthouses/Mayfield ...................................................................... 36
Page 120 of 238

Page 121

3 | P a g e
7.1.2 Priority Cluster 2 – Loanhead ......................................................................................... 37
7.1.3 Priority Cluster 3 – Penicuik A ........................................................................................ 38
7.1.4 Priority cluster 4 – Penicuik B ......................................................................................... 38
7.1.5 Priority Cluster 5 – Bonnyrigg ......................................................................................... 39
7.1.6 Priority Cluster 6 – Dalkeith ............................................................................................ 40
7.2 MEL/Vattenfall Analysis .......................................................................................................... 40
7.2.1 Zone 1- Shawfair and Danderhall .................................................................................. 42
7.2.2 Zone 2 - Dalkeith and surrounding areas ..................................................................... 44
7.2.3 Easterbush ........................................................................................................................ 45
7.2.4 Penicuik Estate ................................................................................................................. 46
8 Cross Boundary Opportunities ...................................................................................................... 48
8.1 Millerhill EfW ............................................................................................................................. 48
8.2 East Lothian .............................................................................................................................. 49
9 Net Zero Solutions .......................................................................................................................... 50
10 Next Steps ..................................................................................................................................... 52
11 Funding & Investment .................................................................................................................. 53
11.1 Scottish Government Funding ............................................................................................. 53
11.2 Alternative funding options ................................................................................................... 54
12 Delivery Plan ................................................................................................................................. 56
Appendix 1 – Stakeholder Engagement ................................................................................................ 63
Internal Engagement......................................................................................................................... 63
External Engagement ................................................................................................................ 64
Appendix 2 -  LHEES Considerations ..................................................................................... 69 
List of Figures 
Figure 1: Key Heat in Building Strategy targets ........................................................ 22
Figure 2: Domestic Stock Overview (Baseline Tool, 2023) ...................................... 26
Figure 3: Domestic EPC and Fuel Overview (Baseline Tool, 2023) ......................... 27
Figure 4: Fabric Overview (Baseline Tool, 2023) ..................................................... 27
Figure 5: Baseline Overview .................................................................................... 28
Figure 6: Energy Efficiency cross intermediate Zones (National Assessment, 2022)
................................................................................................................................. 29
Figure 7: MLC Uninsulated Walls (Changeworks, 2023) .......................................... 30
Figure 8: MLC Loft Insulation (Changeworks, 2023) ................................................ 31
Figure 9: MLC Fuel Poverty Overview (Changeworks,2023) ................................... 32
Page 121 of 238

Page 122

4 | P a g e
Figure 10: Intermediate zone overview of Off-gas Category 1(National Assessment,
2022) ........................................................................................................................ 33
Figure 11: On-gas Category 1 Overview (Changeworks, 2023) ............................... 35
Figure 12: Easthouses/Mayfield cluster (Changeworks, 2023) ................................ 36
Figure 13: Loanhead Cluster (Changeworks, 2023) ................................................. 37
Figure 14: Priority Cluster 3 (Changeworks, 2023) .................................................. 38
Figure 15: Priority Cluster 4 Penicuik (Changeworks, 2023) .................................... 39
Figure 16: Priority Cluster 5 Bonnyrigg (Changeworks, 2023) ................................. 39
Figure 17: Priortiy Cluster 6 Dalkeith (Changeworks, 2023) ..................................... 40
Figure 18: Waste Heat & Environmental Sources of Heat Midlothian (Vattenfall,
2023) ........................................................................................................................ 41
Figure 19:Map highlighting HN Expansion across Midlothain (Vattenfall, 2023) ...... 42
Figure 20: Danderhall Heat Network Expansion (Vattenfall, 2023) .......................... 43
Figure 21: Area with Housing, Existing Networks and Heat Sources (Vattenfall, 2023)
................................................................................................................................. 45
Figure 22: DHN Expansion at Easterbush (Vattenfall, 2023) ................................... 46
Figure 23: Area of Penicuik District Heat Network Investment (Vattenfall, 2023) ..... 47
Figure 24: Millerhill EfW in context to Local Authority boundaries (Buro Happold,
2022) ........................................................................................................................ 48
Figure 25: Potential Heat Zones across Midlothian and Edinburgh (Buro Happold,
2022) ........................................................................................................................ 49
Figure 26: Stakeholder Map ..................................................................................... 63
Figure 27: Home Heat Loss (Scottish Energy Grants, 2018) ................................... 73 
List of Tables
Table 1: LHEES Considerations ............................................................................... 13
Table 2: LHEES Considerations with Midlothian Context ......................................... 15
Table 3: National Policy Summary ........................................................................... 21 
Page 122 of 238

Page 123

5 | P a g e
1. Executive Summary
Local Heat & Energy Efficiency Strategies (LHEES) are a key element to the Scottish
Government’s heat decarbonisation and energy efficiency plans which aim to tackle
climate change. The LHEES will consist of a Strategy document that sets out what
needs to be done, as well as a Delivery Plan that will specify the 'how' and 'when',
and what teams will be responsible for delivering the planned works.
The purpose of this LHEES Strategy is to present the evidence base that identifies
what needs to be done across the local authority to change buildings and local
infrastructure by 2045, to fulfil the Scottish Government’s objectives and local
priorities relating to heat in buildings. The interventions as set out occur at the
building level, in heat networks or in a combination of both. The Strategy reflects
national and local priorities, policies and wider strategies. Where feasible, it
considers local and national factors, such as the timing of planned infrastructure
upgrades, access to resources, major projects, decisions over the gas grid and
stakeholder/community engagement. Accompanying this LHEES Strategy is an
LHEES Delivery Plan, which is an action plan that enables the local authority and its
partners to work towards delivery of the changes identified in the LHEES Strategy.
LHEES will have an overarching impact on the objectives found within Midlothian’s
Climate Change Strategy and Single Midlothian Plan. The Council declared a climate
emergency in December 2019 and stated its ambition to achieve Net Zero Carbon
status by 20301. A key component of the declaration is the establishment of a
Citizen's Assembly to engage the community and business sectors and forge a
partnership for change. The strategy acknowledges the Council’s intent, reinforces
the urgency for action and emphasises the necessity for change to mitigate and
adapt to the impacts of climate change and global warming. These are all key
components of this LHEES Strategy. The Single Midlothian Plan2 has outcomes
covering the next 4 years including, health poverty and Net Zero, all of which are
improved through energy efficiency and heat decarbonisation.
To highlight the scale of the challenge, section 7 of this report outlines the baseline
main heating sources for domestic properties across Midlothian. 93% of homes are
currently heated by fossil fuels – mains gas, oil or LPG. This is around 37,200
properties. These all need a Net Zero heat solution, such as a connection to a district
heat network (DNH). For the remaining properties, their priority should be to ensure
their property is as energy efficient as possible alongside potential low carbon heat
technology, such as a heat pump. 
Midlothian has a unique opportunity due to their partnership with Midlothian Energy
Limited (MEL)3. This is a 50/50 joint venture between Midlothian Council and 
1https://www.midlothian.gov.uk/download/downloads/id/4027/midlothians_climate_change_strategy_2020.
pdf 
2 The Single Midlothian Plan | Community Planning in Midlothian | Midlothian Council
3 From waste to low-carbon heating for Midlothian homes | Midlothian Council
Page 123 of 238

Page 124

6 | P a g e
Vattenfall. Vattenfall are one of Europe’s largest producers and retailers of electricity
and heat. This joint partnership aims to invest £100 million in low-carbon energy
projects, including heating, over the next 5 years. Without the rapid deployment of
heat networks at scale it is simply not possible for Scotland to reach its ambitious net
zero by 2045 targets. The heat is already there, all we need is the urgent deployment
of low-carbon heating infrastructure to capture it and supply it to local residents and
businesses. 
This Strategy and the Delivery Plan focus on 6 main outcomes: 
1. Midlothian’s communities and property decision makers will be engaged and
empowered to deliver Net Zero heating targets, this includes making
homeowners and tenants aware of funding and support available to them. 
2. Work with MEL to find low/zero carbon heat solutions to meet the Council’s
climate change targets. 
3. Alleviate fuel poverty and ensure our solutions do not put people into fuel
poverty or further into fuel poverty. 
4. Make Midlothian’s homes and buildings as energy efficient as possible using
a fabric first approach where appropriate. 
5. Ensure that Midlothian Council will have an awareness of investment and
grant funding opportunities and be able to secure this to deliver heat
decarbonisation projects. 
6.  Keep jobs and revenue from heat decarbonisation projects within the
Midlothian economy. 
Midlothian Council’s LHEES sets out a strategy to provide low carbon heat that is
affordable to as many households and buildings as possible. Driving low cost, low
carbon heat over the expensive and challenging fabric first retrofit approach will
allow us to meet our net zero targets, while abiding by our six LHEES outcomes.
Keeping the focus on making buildings ready for low carbon heat will allow us to take
heat further. This principle does not mean that building fabric and energy efficiency is
not important, we will still endeavour to improve our buildings, however if we
prioritise the fabric first approach then low carbon heating will never be rolled out at
scale.   
Modelling suggests the heat networks in Midlothian alone could reduce emissions by
up to 90% in comparison to individual gas boilers fitted in every home. Not only that,
but waste heat captured and supplied by MEL will be more reliable than alternative
low-carbon sources. By 2050, MEL hope to have delivered city-wide district heating
that is capable of supplying heat to the equivalent of 170,000 homes in Midlothian,
Edinburgh and East Lothian - creating 900 jobs along the way4. 
4 From waste to low-carbon heating for Midlothian homes | Midlothian Council
Page 124 of 238

Page 125

7 | P a g e
Glossary 
2.1 Abbreviations 
Acronym Description
EES Energy Efficient Scotland
EESSH Energy Efficiency Standard for Social Housing
EPC Energy Performance Certificate
EST Energy Saving Trust
GIS Geographic Information System
HEEPS:ABS Home Energy Efficiency Programmes for Scotland: Area Based Schemes
IZ Intermediate Zone
LA Local Authority
LHEES Local Heat and Energy Efficiency Strategy
LPG Liquefied Petroleum Gas
mxd Map Exchange Document
PEAT Portfolio Energy Analysis Tool
SAP Standard Assessment Procedure
ToC Table of Contents
UPRN Unique Property Reference Number 
2.2 Terms 
Page 125 of 238

Page 126

8 | P a g e
Terms Description
Baselining Baselining is the purpose of understanding at local authority or strategic level, the
current status of the buildings against the LHEES Considerations, Targets and
Indicators.
Building-level Pathway As part of LHEES Stage 5, a building-level pathway is the outcome of the
assessment undertaken using PEAT. It provides the likely energy efficiency retrofit
technologies, as well as the low carbon heating system (where applicable) to
support building level decarbonisation. 
Criteria Criteria are the settings applied to the Indicators for each Consideration in order to
support Baselining, Strategic Zoning and the identification of Delivery Areas. An
example of Criteria is a simple “no” applied to the Indicator of “wall insulation (Y/N)”
to identify properties with uninsulated walls. Another example is the definition of an
“anchor load” within the Heat Networks analysis, which applies a minimum
threshold to the “heat demand” Indicator. The LHEES methodology provides a set
of default Criteria that local authorities may wish to use, with flexibility to update and
augment these to support local needs or for more focused analysis linked to specific
actions and project identification within the Delivery Plan.
Data - Alternative Alternative data, can overwrite the Core data to improve accuracy (national to local
level of detail, e.g. local housing data to overwrite fields in Home Analytics). 
Data - Core Core data is the data that is essential to complete the minimum requirements of the
LHEES analysis. Core data will come from national datasets e.g. Home Analytics or
the Scotland Heat Map.
Data - Supplementary Supplementary data allows inclusion of additional Indicators to inform specific, local
basel & targets; also, Supplementary data can be used in GIS investigation to
complement the Core analysis carried out in any assessment. An example of
Supplementary data would be the inclusion of a constraints appraisal as part of a
district heating analysis. 
Data Zone Data zones are groups output areas which have populations of around 500 to 1,000
residents.
Delivery Area Delivery areas are at a higher granularity than Strategic Zones. These spatial zones
should set out clusters of buildings within a Strategic Zone or across the whole local
authority that identify potential solution(s) at a delivery level. They will be an
important starting point for identifying a range of projects, regulation and actions
that are within the competence of the Scottish Government, local authorities and
wider partners (included as actions to be developed in the LHEES Delivery Plan).
Detailed practitioner
approach
These Steps form part of the detailed practitioner approach in LHEES Stage 4,
Generation of Initial Areas to set out particularly suitable heat network zones and to
support project identification.  
Indicator For a given Consideration, the purpose of an Indicator is: 
1) to act as a key information field to help characterise and baseline the local
authority.
2) to act as a key information field to support strategic zoning and generation of
initial delivery areas; 
3) if suitable, to act as a key information field to measure progress against Targets
over the duration of the LHEES - set out in the LHEES Delivery Plan. 
For some Considerations, one Indicator may be sufficient, but for others a range
may be appropriate. 
Intermediate Zone Intermediate zones are a statistical geography that are designed to meet
constraints on population thresholds (2,500 - 6,000 household residents), to nest
within local authorities, and to be built up from aggregates of data zones.
Page 126 of 238

Page 127

9 | P a g e
LHEES Considerations The LHEES Considerations are a list of technologies, building typologies and policy
priorities used to identify and target interventions. They include:
- Heat networks
- Off-gas grid buildings
- On-gas grid buildings
- Poor building energy efficiency
- Poor building energy efficiency as a driver for fuel poverty 
- Mixed-tenure, mixed-use and historic buildings
LHEES Delivery Plan An LHEES Delivery Plan is a document setting out how a local authority proposes
to support implementation of its local heat and energy efficiency strategy.
LHEES Guidance The LHEES Guidance sets out the production and content requirements for a local
authority to prepare a Local Heat and Energy Efficiency Strategy and Delivery Plan.
Its purpose is to ensure that a Local Heat and Energy Efficiency Strategy and
Delivery Plan contain outcomes and actions that are backed up by robust data and
analysis, supported by stakeholder engagement, and that are linked to national and
local priorities, plans and targets.
LHEES Methodology The LHEES Methodology is a more detailed, step by step approach, which includes
models, tools and templates, and represents best practice in how to produce an
LHEES in accordance with the requirements set out in the LHEES Order and
Guidance.
LHEES Stages There are 8 LHEES Stages proposed in this methodology. The purpose of the
LHEES Methodology is to enable the local authority to complete LHEES Stages 1 to
6. The completion of these Stages will provide the local authority with the data
analysis and evidence base to enable them to complete their LHEES Strategy and
Delivery Plan documentation. There are two LHEES reporting templates included
alongside this methodology– LHEES Strategy example template and LHEES
Delivery Plan example template. The completion of these two templates will satisfy
the completion of LHEES Stages 7 and 8. The 8 LHEES Stages proposed in this
methodology are:
1 - Policy and strategy review
2 - Data and tools library
3 - Strategic zoning and pathways
4 - Generation of initial delivery areas
5 - Building-level pathway assessment
6 - Finalisation of delivery areas
7 - LHEES Strategy
8 - LHEES Delivery Plan
LHEES Strategy An LHEES Strategy is a long-term strategic framework for—
- the improvement of the energy efficiency of buildings in the local authority’s area,
and
- the reduction of greenhouse gas emissions resulting from the heating of such
buildings
Mixed-tenure, mixed-use
and historic buildings
Mixed-tenure and mixed-use buildings could include a mixture of owner occupied,
private rented and social housing, and also non-domestic uses, or simply multiple
ownership within the same tenure. Historic buildings include the buildings that are
within conservation areas or those that are listed buildings. These categories may
require established alternative approaches and regulation for the installation of low
carbon heat and energy efficiency solutions and where specific advice and support
might be available relating to the installation of these solutions.
Potential Zones The analysis carried out for strategic zoning and pathways for the heat networks
Consideration is to identify potential zones rather than the otherwise used naming
convention of Delivery Areas. The potential zones identified are to be included in
the LHEES Strategy and should inform actions around further investigation /
progression within the LHEES Delivery Plan. The heat networks Consideration
analysis and activity carried out within LHEES is also anticipated to support activity
Page 127 of 238

Page 128

10 | P a g e
related to formal zone designation as required by the Heat Networks (Scotland) Act
2021.
Raster A matrix of squares, or grid, used as a method of data analysis in GIS. Each cell in
the grid contains a value representing information on the cell’s contents.
Strategic Zone Strategic Zones present a visualisation of the potential pathways to decarbonise the
building stock at a local authority level. These could, for example, be split out by
intermediate zone or data zone. They are useful to understand the baseline
performance, the scale of potential and initial areas of focus, which could be used to
inform Delivery Areas and follow on engagement.
Targets Targets are the measurable aspect of the Consideration and are likely to be taken
directly from national and/or local policy documentation, for example net-zero by
2045, or EPC C by 2040. Targets are likely to comprise of end-point targets and
milestone targets and would sit along a timeline within (and beyond) the LHEES.
This timeline would help to prioritise the types of projects undertaken within the
LHEES over its duration.
Weighting For some Considerations, one Target and Indicator may be sufficient, but for others
a range of Indicators may be appropriate to contextualise and characterise
performance against a Target and/or progress towards a Consideration. If multiple
Indicators are used in strategic zoning or the identification of delivery areas, a
Weighting can be applied based on the importance of each. The LHEES
methodology sets out a core set of default Weightings for instances where multiple
Indicators are suggested as a default setting. There is flexibility to update and
augment these to support local needs or for more focused analysis linked to specific
actions and project identification within the Delivery Plan. 
Page 128 of 238

Page 129

11 | P a g e
3 Introduction 
3.1 Overview of LHEES 
Local Heat and Energy Efficiency Strategies (LHEES) are at the heart of a place
based, locally-led and tailored approach to the heat transition. These local Strategies
will underpin an area-based approach to heat and energy efficiency planning and
delivery. This LHEES Strategy will set out the long-term plan for decarbonising heat
in buildings and improving their energy efficiency across the Midlothian Council area. 
LHEES are primarily driven by Scotland’s statutory targets for greenhouse gas
emissions reduction and fuel poverty5:
• Net zero emissions by 2045 and 75% reduction by 2030.
• In 2040, as far as reasonably possible, no household in Scotland is in fuel
poverty.
For the Midlothian Council area, this Strategy will: 
• set out how each segment of the building stock needs to change to meet
national and local objectives, including achieving zero greenhouse gas
emissions in the building sector, and the removal of poor energy efficiency as
a driver of fuel poverty; 
• identify strategic heat decarbonisation zones, and set out the principal
measures for reducing buildings emissions within each zone; and  
• prioritise areas for delivery, against national and local priorities. 
The LHEES will draw on standardised methodology provided by the Scottish
Government to determine how the stock of Midlothian Council’s buildings will need to
change in order to meet national energy efficiency objectives and will seek to identify
heat decarbonisation zones and establish priorities for the delivery of these zones. 
This Strategy will be accompanied by a Delivery Plan. This will be developed in
partnership with key stakeholders, and will provide a strong basis for action in local
communities, and with government, investors, developers and wider stakeholders,
pinpointing areas for targeted intervention. 
3.2 Scope and Limitations 
The full building stock, both domestic & non-domestic throughout the Midlothian
Council area will be included within the scope of this strategy. It will cover a wide 
5 Climate Change (Scotland) Act 2009 (legislation.gov.uk)
Page 129 of 238

Page 130

12 | P a g e
range of buildings including private homes, Council and Registered Social Landlord
owned houses, Council buildings as well as private commercial businesses. 
There are limitations to the LHEES methodology provided by the Scottish
Government due to data quality and reliability The data used within this strategy is
mainly derived from the Home Analytics (HA) data set. This data is derived from
EPC and Home Energy Scotland (HES) which is often based off assumptions and
recognised as not always accurate. EPC data is constantly being updated as new
certificates are issued daily, and there is a time lag between this and the updating of
the HA data set. This can result in a data set that is inconsistent to the data we hold
internally. 
Page 130 of 238

Page 131

13 | P a g e
4 Background Information 
4.1 LHEES Structure 
As established in the Local Heat and Energy Efficiency Strategies (Scotland) Order
20226, LHEES should have a two-part structure – a Strategy and a Delivery Plan.
A local heat and energy efficiency strategy is a long-term strategic framework to
address the required:
• Improvement in energy efficiency of buildings in the local authority’s area, and
• The reduction of greenhouse gas emissions resulting from the heating of such
buildings
The Delivery Plan sets out how Midlothian proposes to support implementation of its
LHEES to deliver heat and energy efficiencies within the plan area. 
4.2 LHEES Function 
The LHEES Guidance outlines that the function and scope of the LHEES should be
framed around five ‘LHEES Considerations’, outlined in Table1. More information on
the LHEES considerations can be found in appendix 2. 
Table 1: LHEES Considerations 
6 Footnotes - Local heat and energy efficiency strategies and delivery plans: guidance - gov.scot (www.gov.scot)
Page 131 of 238

Page 132

14 | P a g e
The Strategy will set out the long-term plan for decarbonisation of heat in buildings
whilst improving their energy efficiency. This will apply across the entire local
authority area and will be framed around the following LHEES Considerations (heat
decarbonisation and energy efficiency). 
Heat decarbonisation7:
This comprises identifying off-gas areas that will transition from primarily heating oil
and LPG heat sources to renewable energy sources, which in urban areas might
include identified viable heat networks. 
By 2030 at least 1 million homes (across Scotland) will need to have switched from
carbon-based heat sources such as natural gas, heating oil and LPG to zero
emission renewable energy heat sources such as air, ground (or water source) heat
pumps, or particularly in urban areas where possible, heat networks8.
In Off Gas Areas the focus will be on the transition away from heat sources
reliant on heating oil or LPG to air source, or ground or water source heat
pumps where these are viable.
In On Gas Areas the priority will be to eventually phase out the use of natural
gas entirely, and transition to zero carbon heating which could involve air
source heat pumps, ground source heat pumps (where land is available) or
connecting to district heating networks.
Energy efficiency9:
The focus will be to identify areas where building fabric is of low thermal quality as
this results in a larger proportion of household income being spent on heating the
home to an acceptable level. Poor building energy efficiency therefore acts as a
driver of fuel poverty. In reference to the LHEES outcomes, this should not prevent
the move over to low carbon heat.
4.3 Prioritising LHEES Considerations in a Local Context 
Decision making on how to prioritise Considerations in Midlothian’s first LHEES has
been informed largely through identification of local priorities alongside analysis of
the characteristics of the building stock across the Council area. An overview of
Midlothian Council’s priority indicators are shown in table 2. 
7 Decarbonisation is the use of renewable electricity to generate heat in the building
8 Chapter 2 A 2045 Pathway for Scotland's Homes and Buildings - Heat in buildings strategy - achieving net zero
emissions: consultation - gov.scot (www.gov.scot)
9 Energy efficiency is the use of less energy to perform the same task or produce the same result
Page 132 of 238

Page 133

15 | P a g e
Table 2: LHEES Considerations with Midlothian Context
LHEES Consideration Description Midlothian Context
Heat Networks Highlighting zones within a
local authority where heat
networks present a potential
decarbonisation option.
Midlothian is highly suitable for
heat networks from a heat
demand and waste heat
perspective. This
Consideration is a priority
focus for the LHEES. 
Poor Building Energy
Efficiency as a driver for fuel
poverty. 
Identifying possible locations at
a strategic and delivery level
where poor building energy
efficiency acts as a driver for
fuel poverty.
Midlothian’s LHEES has
focused on this Consideration
as a
mechanism of reducing fuel
poverty and heat demand.
On-Gas Grid Buildings Identifying potential on-gas
heat decarbonisation pathways
and opportunities at a strategic
and delivery level.
Midlothian’s LHEES has
focused on this Consideration
to better understand
connection
viability for heat networks and
to identify decarbonisation
pathways for areas not suitable
for heat networks.
Poor Building Energy
Efficiency
Identify possible locations at a
strategic and delivery level
where poor building energy
efficiency exists across the
local authority.
This has been incorporated
into delivery of the heat
networks Consideration
which will need to consider
domestic energy efficiency
interventions in indicative
Heat Network Zones.
Off-Gas Grid Buildings Identify off-gas heat
decarbonisation pathways and
opportunities at a strategic
level and at a delivery level.
87% of Midlothian’s domestic
properties are on the gas-grid.
This Consideration therefore
has not been prioritised for the
current LHEES. 
4.4 Stakeholder Engagement 
Developing Midlothian’s LHEES has necessitated robust stakeholder engagement.
Some of the key engagement activities included –
• Initial internal meetings to advise on the scope of Midlothian’s LHEES upon
development of the outputs of stages 1-4 of the Methodology.
• Ongoing internal engagement with Housing and Planning officers.
• Ongoing engagement with strategic partners such as Changeworks, MEL and
Vattenfall. 
• Engagement with other local authorities producing LHEES through the Local
Authority LHEES Forum. Engagement with the Scottish Government on the
development of the LHEES Guidance and the regulations around the Heat
Networks Act.
Page 133 of 238

Page 134

16 | P a g e
• Engagement with external stakeholders including Registered Social Landlords
(RSLs), Private Landlords and Businesses. 
Future engagement that is undertaken after the publication of this strategy will be
critical in meeting the main outcomes. Plans for a robust community engagement
campaign are in place. 
More detail regarding stakeholder engagement can be found in appendix 1. 
4.5 Local Authority Formalities 
A full Integrated Impact Assessment (IIA)10 has being undertaken for the LHEES
Strategy. This IIA covers both the LHEES Strategy and Delivery Plan. A Strategic
Environmental Assessment (SEA)11 Screening report has also been undertaken for
the LHEES Outputs specifically and results have indicated that a full SEA is not
required.   
4.6 Local Authority Progress 
4.6.1 Local Development Plan (LDP) 
The current development plan for Midlothian is made up of two plans:
• The Midlothian Local Development Plan12, adopted 7 November 2017.
• National Planning Framework for Scotland 413, adopted 13 February 2023.
The 2017 Midlothian Local Development Plan sets out the development strategy for
Midlothian. It sets out the detailed policies used to determine planning applications in
Midlothian. The Development Plan Scheme (DPS) contains the timetable for
preparing the next development plan which is due in 2017. It sets out the Council's
proposed engagement activity by considering Midlothian's second Local
Development Plan, and seeks feedback on the Council's proposed engagement
activity.
The LHEES Lead will work closely with planning officers to ensure the LHEES
priorities are met in the next publication of the LDP. 
10 Equality and Diversity reports | Section 4 integrated impact assessment (midlothian.gov.uk)
11https://www.midlothian.gov.uk/download/downloads/id/2508/development_sites_assessment_technical_no
te.pdf 
12 Midlothian Local Development Plan 2 | Development plans and policies | Midlothian Council
13https://www.midlothian.gov.uk/download/downloads/id/4961/national_planning_framework_4_npf4_info.
pdf 
Page 134 of 238

Page 135

17 | P a g e
4.6.2 Energy Efficiency Standard for Social Housing (EESSH) 
Changeworks was commissioned to carry out a baseline energy efficiency stock
analysis on Midlothian Council’s domestic housing stock and how compliant the
properties are with the Scottish Government’s Energy Efficiency Standard for Social
Housing 2 (EESSH2)14.  At the time of commissioning, EESSH2 guidance required
all social housing to meet the Scottish Government’s ambitious target of an Energy
Efficiency (EE) rating of 81, equivalent to an EE band B by 2032 within the limits of
cost, technology and necessary consent. 
The average EE rating across the 6,945 analysed properties from Midlothian Council
is 70, which is equivalent to a ‘low’ EE band C. This is 3 points higher than the
average score of 67 for Scottish local authorities. Over half (57%) of the Council’s
properties have an EE band C (3,956 properties) and one-third (32%) are in the
lower bands D to G (2,205 properties).
To increase the energy efficiency of the stock, the following measures were
identified:
• Loft and roof insulation measures are applicable for 850 properties (12% of the
stock)
• Wall insulation measures are applicable for 714 properties (10% of the stock)
• High efficiency glazing is applicable for 3,290 properties (47% of the stock)
• Floor insulation measures are applicable for 4,764 properties (69% of the stock)
• Heating upgrade measures are applicable for 1,066 properties (15% of the stock)
• Solar PV for 2,907 properties (42%)
• Solar thermal for 67 properties (1%)
The next steps for social housing will involve a more in-depth analysis of the housing
stock, taking each property individually and assessing the measures required. 
4.6.3 Local Housing Strategy (LHS) 
The Housing (Scotland) Act 2001 requires local authorities to prepare a Local Housing
Strategy (LHS) for their area. The Local Housing Strategy’s strategic vision for
housing in Midlothian is that: “All households in Midlothian will be able to access
housing that is affordable and of good quality in sustainable communities”. 
LHS Outcomes 2021-2026:
• Access to housing and the supply of new housing has increased across all
tenures in Midlothian. 
14 Energy efficiency in social housing - Home energy and fuel poverty - gov.scot (www.gov.scot)
Page 135 of 238

Page 136

18 | P a g e
• Improve Place Making in Midlothian.
• Homeless households and those threatened with homelessness are able to
access support and advice services and all unintentionally homeless
households will be able to access settled accommodation. 
• The needs of households with particular needs will be addressed and all
households will have equal access to housing and housing services. 
• Housing in all tenures will be more energy efficient and fewer households will
live in, or be at risk of, fuel poverty. 
• The condition of housing across all tenures is improved. 
• Integration of Housing, Health and Social Care in Midlothian is improved.
The LHEES Lead will work closely with housing officers to ensure the LHEES
priorities are met in the next publication of the LHS. 
4.6.4 Energy Efficient Scotland: Area based Schemes 
Midlothian Council officers are working closely with Changeworks to deliver the
EES:ABS15 projects across Midlothian. The LHEES lead is working with the
individuals responsible for these projects to ensure that they are in line with LHEES
priorities. EES: ABS projects with Midlothian Council include solar panels, battery
storage and/or external wall insulation.
So far Changeworks have installed measures in over 1038 properties across the
council. Around 650 of these are EWI projects in Mayfield, Penicuik and Bonnyrigg.
Around 334 properties across Penicuik, Woodburn, Gorebridge, Danderhall and rural
areas (Cousland) have had Solar PV installed. In addition to these projects some
properties have had underfloor insulation where suitable.   
4.6.5 Heat network Activity 
Midlothian has a unique opportunity due to their partnership with Midlothian Energy
Limited (MEL). This is a 50/50 joint venture between Midlothian Council and
Vattenfall. Vattenfall are one of Europe’s largest producers and retailers of electricity
and heat. The 50/50 joint venture is currently delivering low carbon energy projects
across the council. 
The first project is a low carbon district heating network supplying the new Shawfair
town in the north of the council area. Zero Waste contractor FCC Environment,
which operates Edinburgh and Midlothian councils’ energy from waste facility (EfW)
near Millerhill, supplies low carbon heat to the DHN. The EfW plant is fuelled by
residual waste collected by Midlothian, Edinburgh and East Lothian council’s. The
first phase of the project is supply 3,000 homes, education and retail properties at 
15 Energy Efficient Scotland: Area Based Schemes | Changeworks
Page 136 of 238

Page 137

19 | P a g e
Shawfair Town, saving over 2,500 tonnes of CO2 per year. Heat, which is
generated by the energy centre, is schedule to be switched on in July 2024,
with heat coming from the EfW plant expected in 2025. 
MLC has also signed a 40 year agreement with the MEL to supply heat to new public
buildings that are built within the new Shawfair town. MEL will negotiate final
contracts with its main initial partners, FCC Environment16 and Shawfair LLP17. FCC
will supply the low carbon heat and Shawfair LLP will facilitate the connections to
new domestic and commercial developments in the town.
Additionally, there is a small heat network within the town of Bonnyrigg. This was
one of the first in Scotland and was renewed and upgraded to a CHP system in
2003. It provides 215 homes with heating and hot water through 4km of underground
pipes. 
This LHEES report will outline the future for heat networks across the Midlothian. 
4.6.6 LHEES Pilot 
Changeworks were procured as consultants to undertake the phase 2 LHEES pilot
study for Midlothian. The primary aim of the LHEES Phase 2 pilots were to test and
develop methods for creating an LHEES, identify relevant sources of data (and any
data gaps), and gain a fuller understanding of the resources and capabilities required
to deliver an LHEES.
For Midlothian the focus was on energy efficiency in able to pay18 (domestic and
non-domestic) and domestic private rented sector across the whole local authority
area. The project included baseline data reporting, objectives and targeting,
measures evaluation, stakeholder engagement, socio-economic analysis and an
implementation plan. 
16 Home Page - Millerhill (fccenvironment.co.uk)
17 Welcome to Shawfair - New Homes, Offices, Retail in Edinburgh - Shawfair
18 Decision maker should be able and willing to carry out energy efficiency improvements.
Page 137 of 238

Page 138

20 | P a g e
5 Policy & Strategy Context 
The Scottish Government’s Energy Efficient Scotland route map19 sets out two key
objectives:
1. Removing energy efficiency as a driver for fuel poverty
2. Removing GHG emissions through energy efficient buildings and
decarbonising the heat supply. 
In attempt to meet these objectives the Government is encouraging targeted area-
based schemes led by LAs. LHEES are in place to set the framework and delivery
programme for how each LA will reduce energy demand and decarbonise the heat
supply in their area.  
The national heat and energy efficiency policy landscape in the Scotland is well
developed and LHEES will form part of this jigsaw.  The Heat Networks (Scotland)
Act20 places a duty on local authorities to carry out a review to consider areas within
its boundaries that are likely to be suitable for heat network construction. Although
this guidance sits outside the scope of LHEES, the LHEES strategy and delivery
plan will support consideration and presentation of evidence relating to the matters
set out within Section 48 of the Heat Networks (Scotland) Act 2019. Therefore,
LHEES and the duties of the Heat Network Scotland Act interact. 
The Fuel Poverty (Targets, Definition and Strategy) (Scotland) Act 201921 will shape
the LHEES due to reducing energy efficiency as a driver for fuel poverty being a key
objective. The targets from this strategy will form an important aspect of each local
authorities LHEES plans. LHEES will also sit within the Energy Efficiency Standard
for Social Housing (EESSH 1&2) and The Planning (Listed Building Consent and
Conservation Area Consent Procedure) (Scotland) Regulations 201522 as these
regulations directly apply to the approaches domestic properties are being
constructed by.
LHEES must feed into the policy landscape to ensure energy and heat
decarbonisation is recognised as a priority across the local authority area. 
19 Energy Efficient Scotland: route map - gov.scot (www.gov.scot)
20 Heat Networks (Scotland) Act 2021 (legislation.gov.uk)
21 Fuel poverty - Home energy and fuel poverty - gov.scot (www.gov.scot)
22 The Planning (Listed Building Consent and Conservation Area Consent Procedure) (Scotland) Regulations
2015 (legislation.gov.uk) 
Page 138 of 238

Page 139

21 | P a g e
5.1 National Policy & Strategy 
The main national policies are detailed in table 3. These will be regularly reviewed
for future iterations to highlight any changes, and how they influence ongoing
delivery. 
Table 3: National Policy Summary
The Climate Change (Emissions
Reduction Targets) (Scotland) Act
2019
Targets to reduce Scotland's emissions of all GHGs to net-
zero. Net-zero by 2045; 56% by 2020; 75% by 2030; 90%
by 2040 
The Fuel Poverty (Targets,
Definition and Strategy) (Scotland)
Act 2019
The Bill sets out a new target relating to the eradication of
fuel poverty, as well as providing a revised definition of fuel
poverty. By 2040: no more than 5% of households in
Scotland are in fuel poverty; no more than 1% of
households in Scotland are in extreme fuel poverty. By
2030: 15% (FP); 5% (EFP) and by 2035: 10% (FP); 3%
(EFP)
The Heat in Buildings Strategy
(2021)
Updates the Energy Efficient Scotland route map and
commits to putting in place standards and regulation for
heat and energy efficiency to ensure that all buildings are
energy efficient by 2035 and use zero emission heating
and cooling systems by 2045. 
By 2030 over 1 million homes and 50,000 non-domestic
buildings to convert to using zero or low emissions heating
systems.
Energy Efficiency Standard for
Social Housing (EESSH 1&2)
The Standard aims to improve the energy efficiency of
social housing in Scotland. Proposed a target to maximise
the number of homes in the social rented sector achieving
EPC B by 2032
The National Planning Framework The National Planning Framework (NPF) sets the context
for development planning in Scotland and provides a
framework for the spatial development of Scotland as a
whole.
Heat Networks (Scotland)
Act 2021
Regulates heat networks, supporting objectives in the Heat
in Buildings Strategy to grow heat network opportunities.
This strategy helps Midlothian Council meet part of its duty
within the Act by identifying potential heat network zones.
Other duties excluded from this strategy are identifying
non-domestic building connections; designating zones;
setting up permitting, regulation, and licencing processes;
and developing a cost strategy.   
Page 139 of 238

Page 140

22 | P a g e
5.2. Heat in Buildings Strategy 
The Heat in Buildings Strategy is the document where the LHEES concept has
derived from, therefore making it one of the key pieces of legislation relevant to this
strategy. The key targets of this strategy are displayed below in figure 1. 
Figure 1: Key Heat in Building Strategy targets 
5.3 Local Policy & Strategy 
Midlothian Council declared a climate emergency in December 2019 and stated its
ambition to achieve Net Zero Carbon status by 2030.
Table 3 provides an overview of the local policy landscape in relation to Midlothian
council specifically. These strategies and plans will be considered when developing
and implementing the LHEES. LHEES will have an interaction with the Local
Housing Strategies (LHS), specifically section 11 of the LHS guidance which makes
reference to LHEES. Although LHEES will not change the reporting duties on fuel
poverty, energy efficiency and climate change, the analysis required to produce
LHEES, along with the resulting Strategy and Delivery Plan documents will provide
key evidence to support reporting in the LHS. At the same time, the outcomes and
actions set out in the LHS (due for renewal in 2026), will feed into and shape
2028: Private rented
homes to EPC C
2030: Emissions from buildings must
be 68% lower than 2020 levels2030: Zero emission
heating in the equivelant
of 50,000 non-domestic
buildings
2033: All homes to be
EPC C or better and zero
emission heating in
170,000 off-gas fossil fuel
heated homes and 1
million on-gas homes.
2040: All fuel poor homes to EPC B
2045: Buildings no longer
contribute to climate chnage
Page 140 of 238

Page 141

23 | P a g e
LHEES. LHEES will have a similar interaction with Midlothian’s Local Development
Plan (LDP). 
The draft Fourth National Performance Framework (NPF4) states that: ‘In taking
forward national developments we expect delivery partners to consider how the
development interacts with the provision of heat for the surrounding area, potentially
in connection with LHEES and emerging plans for the heat sector in the longer term’.
Midlothian’s LDP, which is due in line with the LHS in 2026, should take into account
the area’s LHEES and areas of heat network potential and any designated heat
network zones when allocating land’. LDP sites should be considered when
undertaking zoning as part of LHEES, in particular feeding into potential heat
network zones. These local strategies will feed into LHEES directly, however the
additional strategies and plans outlined in table 4 will also have a relation. 
Table 4: Local Policy & Strategy Review
Singe Midlothian Plan Community Planning Partnerships (CPPs) draw together
public, voluntary and private sector bodies, and local
communities. CPPs deliver a shared ‘plan’ based on evidence
to improve the lives of local people. Relevant objectives
include: ‘To explore the exploration of ground and roof
mounted solar panels on Council owned land and property’
and ‘increase renewable energy’. 
Midlothian Climate Change
Strategy
Midlothian Council aims to lead by example and has
developed a Climate Change strategy. The strategy outlines
the challenges and provides an action plan to achieve targets
and contribute to a net zero position. Objectives include
raising awareness of climate impacts and taking a ‘One
Council’ Approach to reducing carbon emissions. 
Local Development Plan 2017 There were no targets regarding private housing however this
plan seeks to mitigate greenhouse gas emissions arising from
the use of buildings by limiting energy use, improving energy
efficiency and requiring the use of low and zero carbon heat. 
Local Housing Strategy 2021-
2026
The Housing (Scotland) Act 2001 requires local authorities to
prepare a Local Housing Strategy (LHS) for their area,
supported by an assessment of housing need and demand.
Strategic Housing Investment
Plan 2023/24
The purpose of Midlothian’s Strategic Housing Investment
Plan (SHIP) is to set out strategic investment priorities for
affordable housing over a 5 year period to achieve the
outcomes set out in the Local Housing Strategy (LHS). The
SHIP priorities are clearly aligned with the LHS Outcomes
Action Plan 2021-2026
Energy Efficiency Standard for
Social Housing 2023/24
Aim to reduce energy consumption, fuel poverty and
greenhouse gas emissions. Target to make a significant
contribution to reduce carbon emissions by 80% by 2050 in
line with the requirements set out in the Climate Change
(Scotland) Act 2009
Page 141 of 238

Page 142

24 | P a g e
5.4 Resources 
In Scotland there are several useful resources for advice and funding for energy
efficiency measures. Home Energy Scotland23 is funded by the Scottish Government
and is the main supplier of energy advice and grant funding in Scotland. Their email
and phone service along with their website provides users with detailed advice on
energy efficiency measures and low carbon renewable technologies. Funding
includes interest free loans and full or part funded grants for householders and
landlords. 
The Warmer Home Scotland24 Scheme delivered by Warmworks is another
government funded scheme to assist with energy efficiency. This scheme is means
tested25 and can provide the householder with an improved heating system,
renewable technology and insulation. 
Home Energy Efficiency Programmes for Scotland (HEEPS) is another funding
platform to tackle fuel poverty and increase energy efficiency. Householders can
benefit from insulation measures and sometimes heat pump installation either fully or
part funded.
Business Energy Scotland26 and Zero Waste Scotland also provide funding and
support to small local businesses across Scotland. 
6 Baselining - Domestic 
Core datasets used in this LHEES analysis are:
Home Analytics (domestic): Home Analytics is a dataset delivered by Energy
Saving Trust, which pulls together data on residential properties throughout Great
Britain. It combines energy efficiency metrics with a range of property attributes,
geographical factors and socio-demographic information. The dataset provides detail
available at individual property level and combines both actual and modelled values.
It should be noted that the data is not 100% accurate, as the characteristics of some
properties are based on extrapolated data. In LHEES analysis, this dataset is used
for the domestic building stock assessment. 
23 Home Energy Scotland
24 Warmer Homes Scotland • Warmworks • Bringing warmth to homes and communities.
25 A means test is a determination of whether an individual or family is eligible for government assistance or
welfare
26 Business Energy Scotland · Make Your Business Greener
Page 142 of 238

Page 143

25 | P a g e
Scotland Heat Map27: The Scotland Heat Map consists of a number of separate
layers mapping energy consumption. The purpose of the map is to determine heat
demand and heat sources across Scotland to facilitate the optimisation of energy
supplies and infrastructure investment. For the GIS analysis elements of the LHEES
approach, the Scotland Heat Map “Geographic Boundaries” dataset is used to
provide precise geographic areas, with Data Zones utilised within this methodology.
One Scotland Gazetteer’s Address Gazetteer28: The One Scotland Gazetteer
(OSG) is a national land, property and address dataset that comprises data from
each local authority in Scotland. In LHEES analysis, it is used for non-domestic
properties that fall in mixed (domestic and non-domestic) and non-domestic shared
buildings.
Green Heat in Greenspaces (GHiGs) - GIS layer: The Green Heat in Greenspaces
dataset has been produced by Greenspace Scotland to explore how areas of
greenspace across Scotland can contribute to transforming the urban landscape of
the future to one based on low carbon heat. In particular, it focuses on the potential
of greenspaces to host solutions using heat pump technology and district heat
networks based on their physical characteristics and proximity of location in relation
to heat demand. The GHiGs layer was used to identify areas with potential use of
ground source heat pump networks and in conjunction with heat network zones
identification. 
27 Scotland Heat Map (data.gov.scot)
28 OSG | One Scotland Gazetteer
Page 143 of 238

Page 144

26 | P a g e
7.1 Summary 
Midlothian is a relatively small local authority with around 40,000 domestic
properties. The majority (73%) were built pre-1984, this is similar to the national
average (70%). The older housing is typically located in the smaller mining villages.
8% of homes are in conservation areas with only 2% being listed. Midlothian has a
wide range of property types (figure 2). The majority of dwellings are houses (75%),
compared with 25% being flats. This is lower than the national average of 40%. The
tenure profile highlights that the majority (75%) are owner occupied, 11% council
housing and 10% privately rented. 
The baseline data for Midlothian also considers energy efficiency and fuel type
(figure 3). 49% of homes have an EPC of C or above, while 50% of homes have an
EPC of D or below, this is in line with the national average. The majority (89%) of
homes are connected to the gas grid, this is higher than the national average (83%).
Of those who are not on mains gas, 4% are heated using electricity, 3% use oil, 2%
biomass and 1% LPG. 
Figure 2: Domestic Stock Overview (Baseline Tool, 2023)
Page 144 of 238

Page 145

27 | P a g e
Figure 3: Domestic EPC and Fuel Overview (Baseline Tool, 2023)
In terms of the fabric of the buildings across Midlothian (figure 4), the majority (59%)
of properties are of cavity construction, however only 45% of these have been
insulated. This is lower than the national average of 73%. 15% of homes are of solid
wall construction, with 11% of these being insulated. This is lower than the national
average of 17%. The majority (54%) of homes have 250mm of loft insulation or more
with only 5% having 99mm of loft insulation or less, this is on par with the national
average. Midlothian has good levels of window fabric, with 91% of properties being
double or triple glazed. 
Figure 4: Fabric Overview (Baseline Tool, 2023)
Finally, figure 5 presents a summary of Midlothian’s baseline. The heat demand
statistics will be used within the heat zoning section of the LHEES Strategy. The key
points derived from this summary that will be a focus point in this strategy are: 
Page 145 of 238

Page 146

28 | P a g e
• 30% of homes are uninsulated. 
• 55.6% of homes have EPC D-G.
• 19.4% of households are in fuel poverty.
• 7.6% of households are in extreme fuel poverty. 
Although levels of fuel poverty are high, they are below the average of 24.6% and
12.4% respectively. 
Figure 5: Baseline Overview
7.2 Core Indicators
This section further examines the Baseline data across Midlothian’s 22 Intermediate
Zones. Taking key information from the previous section, focus will be given to
energy efficiency, fuel poverty and fuel type. Relevant core indicators29 will be used
for each analysis and explanation will be provided as to why each indicator and
weighting30 has been used. Recommendations and conclusions will be serviced
across strategic zones. 
7.2.1 Energy Efficiency
When assessing energy efficiency, three core indicators are used; loft insulation
(between 0-99mm), single glazed windows and wall insulation (all constructions).
The weightings for these indicators have been given consideration to the home heat
loss figures discussed in section 5. Wall insulation has been given a higher
weighting, followed by loft insulation and then window glazing as this corresponds 
29 Indicators are applicable across LHEES considerations and are structured around maters such as
building characteristics, energy efficiency and tenure.
30 If multiple Indicators are used in strategic zoning or the identification of delivery areas, a Weighting
can be applied based on the importance of each
Page 146 of 238

Page 147

29 | P a g e
with the level of heat that can escape from a typical building. At this stage only the
individual indicators are shown and explained in the following sections. Figure 6
presents a spatial overview of Energy Efficiency within the intermediate zones,
highlighting that Straiton, Rural South Midlothian, Eskbank and Roslin and
Bilston are the areas with the highest level of poor energy efficiency (shown in dark
blue). 
Figure 6: Energy Efficiency cross intermediate Zones (National Assessment, 2022) 
7.2.1.1 Wall Insulation 
As seen in figure 7, Midlothian has substantially higher wall insulation rates as
compared to the rest of the country (only 29% of properties are uninsulated in MLC
vs. 41% nationally). 
Page 147 of 238

Page 148

30 | P a g e
Figure 7: MLC Uninsulated Walls (Changeworks, 2023)
The majority of uninsulated walls are cavity wall properties (46% of the total
uninsulated walls, as compared to 27% nationally). As uninsulated cavity wall
properties in MLC represent 13% of the total area. Increasing the insulation of cavity
walls in the owner occupied and privately rented tenures will be important. Data
Zones with the highest density of uninsulated cavity wall properties are Penicuik
North, Roslin and Bilston and Newbattle and Dalhousie. Some of the needed
cavity wall insulation could be planned for through EESABS projects, at least in
appropriate areas (i.e. with high fuel poverty levels). 
The second driver for uninsulated walls is solid brick or stone wall properties, which
represent 34% of uninsulated walls and 10% of total the properties in the area. Data
Zones with the highest density of uninsulated solid brick or stone wall properties are
Dalkeith, Eskbank, Penicuik Southeast and Roslin and Bilston. Some of the
needed solid wall insulation could be planned for through EESABS projects, at least
in areas with high fuel poverty levels. 
7.2.1.2 Loft Insulation 
The map in figure 8 shows standardised probability of loft insulation levels being less
than 100mm. Loft insulation rates are higher than the national average. 63% of
properties with lofts have loft insulation over 250mm, this is higher than the national
average of 48%. Privately rented properties with lofts had the lowest levels of loft
Page 148 of 238

Page 149

31 | P a g e
insulation over 250mm (57%). This highlights potential need for landlord
engagement. Data Zones with the highest density of loft insulation below 99mm are
Straiton, Eskbank and Loanhead. 
Figure 8: MLC Loft Insulation (Changeworks, 2023)
7.2.1.3 Single Glazing 
MLC has a high level of double and triple glazing (91%). Data Zones with the highest
level of single glazing are Newtongrange, Dalkeith and Rural Midlothian South.
Potential reasons for this could be that these Intermediate Zones have a large
proportion of properties that are owner occupied, rural and/or listed, making
intervention difficult. Some of the needed glazing improvements could be planned for
through EESABS projects, at least in areas with high fuel poverty levels.
7.2.2 Fuel Poverty 
The fuel poverty rate in MLC is 19% which is an improvement on the nationwide
figure of 24.6% reported in the Scottish house condition survey in 202131. Average
annual fuel costs for combined gas and electricity is £1,424, based on the 2017
energy data provided by BEIS32. This is lower than the national average of £1,634. 
31 Introduction - Scottish House Condition Survey: 2021 Key Findings - gov.scot (www.gov.scot)
32 https://assets.publishing.service.gov.uk/media/5a82a3ffed915d74e6236e1c/UK_Energy_in_Brief_2017.pdf 
Page 149 of 238

Page 150

32 | P a g e
The top Data Zones where energy efficiency is likely to be a driver for fuel poverty
are Dalkeith, Mayfield and Newtongrange (figure 9). 
Figure 9: MLC Fuel Poverty Overview (Changeworks,2023) 
7.2.3 Fuel Type 
7.2.3.1 Off-Gas Grid 
This section highlights potential Delivery Areas for transition from heating oil and
LPG to low regrets33 heat pump installations. A total of 3,490 properties fall within
the off-gas grid category, this is equivalent to 8% of the total housing stock
assessed. 
In MLC less than 150 properties have been categorised as Category 034. This covers
properties which already utilise a heat pump or communal heating system. The two
areas with the highest density are around Penicuik and Kippilaw Steading. With 
33 Low-regret actions are relatively low cost and provide relatively large benefits under predicted future
climates
34 Category 0 identifies properties that currently have a low or zero emissions heating system
Page 150 of 238

Page 151

33 | P a g e
142 identified properties, the extent of Category 0 properties is limited. These
properties are spread across the local authority, indicating that to date, retrofit
initiatives have been driven primarily by individual property owners. This reflects a
lack of cohesive retrofit strategies as well as the fact that there are very few
communal oil or LPG heating systems.
For the off-gas areas in MLC, less than 1,300 properties are considered to be 'heat-
pump ready'. This covers properties which considered to be highly suited to a heat
pump solution, as there is an existing wet heating system and the property is well
insulated. Examples of priority areas for Category 135 include Pathhead,
Gorebridge and Woodburn/Whitehall (figure 10). 
Figure 10: Intermediate zone overview of Off-gas Category 1(National Assessment,
2022) 
35 Those considered highly suited for heat pump retrofit (i.e. well insulated properties with a wet
heating system, excluding any consideration of electricity network impacts or costs of any network
upgrades)
Page 151 of 238

Page 152

34 | P a g e
Just a little over 700 properties have been categorised as Category 236. This covers
properties with a wet heating system that will require retrofitting to the building fabric
to become heat pump ready, but at a less extensive level than Category 3
properties. Examples of priority areas for Category 2 include Pathhead, Gorebridge
and Dalkeith.
In MLC just around 1,400 properties are classified as Category 337, which constitutes
only 3 % of the total housing stock. This covers properties which could either
become suitable for heat pump technology (following significant fabric/heat
distribution system upgrade), or have either electric or biomass viable
decarbonisation technology. Examples of priority areas for Category 3 include
Dalkeith, Cousland and Pathhead. 
7.2.3.2 On-Gas Grid 
This section highlights potential Delivery Areas for transition from gas heating
systems to low regrets heat pump installations or communal heating. A total of
38,305 properties fall within the on-gas grid category, this is equivalent to 90% of the
total housing stock assessed (figure 11).
Around 400 on-gas properties have been categorised as Category 0 in MLC. This
covers properties which already utilise communal heating systems. Examples of
priority zones for Category 0 are around Bonnyrigg, Penicuik and Dalkeith.
Close to 26,500 on-gas properties have been categorised as Category 1 in MLC.
This represents 63% of the total assessed housing stock. This covers properties
where minimal fabric upgrade is needed prior to heat pump installation and they
have a wet heating system. Examples of priority areas include Dalkeith, Bonnyrigg
and Penicuik. 
36 Those with secondary potential for heat pump retrofit (i.e. properties in need of moderate fabric
upgrade and / or addition of wet distribution system to be heat pump ready)
37 Those with tertiary potential for heat pump retrofit (i.e. properties in need of significant fabric
upgrade to be heat pump ready).
Page 152 of 238

Page 153

35 | P a g e
Figure 11: On-gas Category 1 Overview (Changeworks, 2023)
12% of the total assessed stock has been identified as Category 2. This covers properties
with a wet heating system that will require retrofitting to the building fabric to become heat
pump ready. Examples of priority areas include Dalkeith and Newtongrange.
Close to 6,500 properties have been identified as Category 3, which is 15% of the total
assessed stock. This covers properties with a tertiary potential for heat pump retrofit or those
buildings not suited to heat pump technology. Examples of priority areas include Dalkeith,
Roslin and Mayfield 
8 Heat Network Zones 
Page 153 of 238

Page 154

36 | P a g e
8.1 LHEES Analysis 
This section shows where heat networks present a potential decarbonisation
pathway that could be of strategic importance for MLC, using the LHEES guidance
and methodology. Six prioritised clusters were identified. The areas of greatest
potential were identified using linear heat density metrics38, anchor load39 threshold
criteria and a 100m resolution raster heat density layer. To make the analysis more
detailed than the standard methodology, Heat Data Point non-domestic properties
were filtered to only include semi-public and public buildings.
Additionally, a sense check of building names was carried out to identify any
indication of a building being Council-owned. If that was the case, they were added
to analysis. This approach was chosen so that only non-domestic buildings that the
Council has full or partial control over are treated as potential anchor loads in the
heat network zoning. When defining anchor loads, public and Council-owned
buildings have been prioritised as the Council has greater control over the operation
of these buildings. 
8.1.1 Priority Cluster 1 – Easthouses/Mayfield 
This cluster has the most anchor loads and good potential heat demand from nearby
properties. Six anchor loads have been identified for this cluster (figure 12):
• Mayfield Primary School
• Saint Lukes RC Primary School
• Mayfield Community Club
• Lawfield Primary School
• Mayfield Leisure Centre
• Newbattle High School. 
38 Linear heat density is a measure of heat load per meter of district heating pipework
39 Anchor loads are significant heat demands that have high potential to be one of the first connected
demands on a network
Figure 12: Easthouses/Mayfield cluster (Changeworks, 2023)
Page 154 of 238

Page 155

37 | P a g e
Due to the high number of anchor loads, there may be scope to develop the heat
network as part of a phased installation strategy to mitigate local disruption and work
within budget constraints. For example, an initial network could be developed in the
north of the cluster as the anchor load has a relatively high density of residential
buildings in close proximity for connection. There is a significant area of greenspace
to the northwest of the cluster which could be utilised for a ground source heat pump
(GSHP) system. The large area of greenspace will also mean that the construction
process in these areas is likely to be quicker, cheaper and simpler as there will be
minimal coordination with existing buried services.
There is one existing heat network within this zone: Salisbury View, which is a
communal heating system serving 42 flats within a social housing facility. 
8.1.2 Priority Cluster 2 – Loanhead 
This zone in Loanhead includes a number of anchor loads with a higher residential heat
demand density from nearby properties. Four anchor loads have been identified for this
cluster (figure 13): 
• Paradykes Primary School
• Loanhead Leisure Centre/     
Loanhead Medical Practice
• Loanhead Primary School
• St Margaret's Roman      
Catholic Primary School. 
Cluster 2 has a lower
total number of anchor
loads; however, there is
a higher density of residential heat density loads in close proximity which improves
network expansion viability. Two of the anchor loads are surrounded by greenspaces
which may be suited to a GSHP installation or this area could be used to house a
centralised energy centre serving the area. Buried pipework routes will likely be
simpler to install in these areas.
There is one existing heat network less than 100m away from the cluster: Hawthorn
Gardens, which is a communal heating system serving 35 flats within a social
housing facility. There are no major obstacles, motorways or waterways. 
Figure 13: Loanhead Cluster (Changeworks, 2023)
Page 155 of 238

Page 156

38 | P a g e
8.1.3 Priority Cluster 3 – Penicuik A 
Three potential anchor loads were identified for this cluster (figure 14): 
• Cuiken Primary School
• The Penicuik Centre
• Penicuik High School. 
There is one existing heat network less than 120m away from the cluster: Heinsberg
House, which is a communal heating system serving 36 flats within a social housing
facility. There are no major obstacles, motorways or waterways. There are high
potential green spaces within the cluster which could be utilised for low carbon heat
systems and distribution pipework.
8.1.4 Priority cluster 4 – Penicuik B 
Priority cluster 4 was also located in Penicuik. Three potential anchor loads were
identified for this cluster (figure 15):
Figure 14: Priority Cluster 3 (Changeworks, 2023)
Page 156 of 238

Page 157

39 | P a g e
• Beeslack High School
• Strathesk Primary School
• Eastfield Medical Centre. 
No existing heat networks have been identified in the area for potential connection or
extension. This cluster includes two major obstacles which will inhibit the
development of a heat network connecting all anchor loads: the Loan Burn stream
and the A701. Isolated Beeslack High School anchor load may be more suited to a
standalone system upgrade, while the other two anchor loads may suit a shared
energy centre.
There are high potential green spaces in the area, especially in the north of the
cluster which could be utilised for low carbon heat systems and distribution pipework. 
8.1.5 Priority Cluster 5 – Bonnyrigg 
Two anchor loads in close proximity have been identified for this cluster (figure 16): 
• City of Edinburgh Trampoline club
• Lasswade High School. 
There are no existing heat networks that
have been identified in the area for potential connection or extension. There are also
no major obstacles, motorways or waterways intersecting this zone which might
impact pipework distribution route planning.
Figure 15: Priority Cluster 4 Penicuik (Changeworks, 2023)
Figure 16: Priority Cluster 5 Bonnyrigg (Changeworks,
2023)
Page 157 of 238

Page 158

40 | P a g e
Similar to cluster 5, the close proximity of anchor loads may suit a shared energy centre to
improve ease of maintenance and reduce costs. 
8.1.6 Priority Cluster 6 – Dalkeith 
Three public anchor loads were identified for this cluster (figure 17): 
• Saltersgate School
• St David's Roman Catholic High School
• Dalkeith High School. 
Figure 17: Priortiy Cluster 6 Dalkeith (Changeworks, 2023)
No existing heat networks or major obstacles, motorways or waterways, have been
identified within or in the proximity of the cluster. There are high potential green
spaces in the area.
There are no Council-owned residential heat loads near the anchor loads meaning
that further engagement with private owners and landlords will be an important factor
in determining heat network viability in this area.
Similar to the first two clusters, two of the anchor loads in cluster 6 are situated close
to greenspaces which may favour a GSHP installation or this area could be used to
house a centralised energy centre serving the area. Buried pipework routes will likely
be simpler to install in these areas as well. 
8.2 MEL/Vattenfall Analysis 
MLC and their partnership with MEL have conducted a heat network review separate
from the LHEES Methodology. This review has highlighted current heat networks
and potential zones that the LHEES methodology did not, this is due to some
buildings OS Addresses not being included in the LHEES analysis and several
anchor loads were not deemed enough to form a cluster. Many of the zones that will
be taken forward into the LHEES Delivery plan are from the MEL analysis as they
are deemed more practical and more likely to gain traction. This highlights the
importance of using accurate and relevant classification codes for buildings and
using an approach which is relevant to the Local Authority.
Page 158 of 238

Page 159

41 | P a g e
The basis of this study was to take the key waste heat opportunities in the area and
assess whether they could serve heat to the following areas. The top waste heat
opportunities in Midlothian are (figure 18):
• Millerhill Energy from waste (EFW) Plant
• Advanced Computing Facility (ACF) at Easter Bush
• Penicuik Estate redevelopment
• Dalkeith Mine water treatment site (MWTS)
• Shallow mine water opportunities 
Figure 18: Waste Heat & Environmental Sources of Heat Midlothian (Vattenfall, 2023)
Based on the review of waste heat in and around Midlothian, Vattenfall (on behalf of
MEL) then measured the areas where MEL could consider investment in district
heating. 4 investment areas were defined:
• Shawfair and Danderhall
• Dalkeith including Eskbank and Woodburn / Bonnyrigg, Lasswade/Mayfield,
Lingerwood and Newtongrange
• Easter Bush, Straiton and Loanhead
• Penicuik
These areas of potential Heat network expansion across Midlothian are presented
visually in figure 19. 
Page 159 of 238

Page 160

42 | P a g e
Figure 19:Map highlighting HN Expansion across Midlothain (Vattenfall, 2023) 
8.2.1 Zone 1- Shawfair and Danderhall 
8.2.1.1 Shawfair and Bio-quarter Extension 
The ESCo, a 50/50 joint venture between MEL and Vattenfall is currently delivering
low carbon energy projects across the council. The first project is a low carbon
district heating network supplying the new Shawfair town. The EfW facility near
Millerhill, supplies low carbon heat to the DHN. The EfW is fuelled by residual waste
collected by Midlothian, Edinburgh and East Lothian councils. MLC has also signed
a 40 year agreement with the MEL to supply heat to new public buildings that are
built at the new Shawfair town. 
The first phase of the project is supply 3,000 homes, education and retail properties
at Shawfair Town, saving over 2,500 tonnes of CO2 per year. The project will benefit
from up to £7.3m from the Scottish Government’s Low Carbon Infrastructure
Transformation Project (LCITP). The first pipes to supply the Shawfair Town with
low-carbon heating have been installed in 2023, with construction on the site now
well-underway. Heat is expected to be delivered to homes by July 2024.
In addition to the Shawfair Network, MEL are working on a business case to take
heat to Edinburgh’s Bio-Quarter. This is proposed to serve new buildings on
Page 160 of 238

Page 161

43 | P a g e
Edinburgh's BioQuarter site masterplan, with connection to existing buildings on site
in due course, including the NHS Royal Infirmary of Edinburgh and the Royal
Hospital for Children and Young People, and the potential to serve social housing
off-site. The study examines the potential for a connection to the Shawfair Heat
Network. 
8.2.1.2 Danderhall 
Figure 20 illustrates the expansion of the Shawfair project to connect the council
owned housing in Danderhall. Danderhall is located 600m from the main Shawfair
Strategic heat network area, immediately to the west of Shawfair Town and to the
east of the Bio Quarter and the Edmonstone Road development. It represents a
suitable domestic and non-domestic heat load, over 5GWh. Given the suitability load
and location it also provides MEL with a compelling reason to develop a
‘replacement heating’ option which will be instrumental in making Danderhall a low
carbon town. 
Danderhall is a small mining village with a high proportion of council housing.
Changeworks are undergoing the first phase of a EWI project in the area which is
using funding from the Net Zero Heat Fund. MLC, Changeworks and MEL are
working together to coordinate fabric improvements alongside heat network
connections in the area. 
Figure 20: Danderhall Heat Network Expansion (Vattenfall, 2023)
Page 161 of 238

Page 162

44 | P a g e
8.2.2 Zone 2 - Dalkeith and surrounding areas 
The Dalkeith MWTS has the potential to serve Dalkeith, Woodburn and beyond. This
will include MEL taking over the current district heat network at Bonnyrigg (figure 21).  
The coal mines once supplied the energy and raw materials that powered industry in
the 19th and 20th centuries, and the fuel to heat domestic properties. Once coal
mines have closed and the pumps are stopped, they fill with water which is heated
through natural geothermal processes. Heat can be transferred from the mine water
to clean water in a district heating network to heat local homes and businesses.
Once a huge contributor to climate change, these coalfields are now being used to
decarbonise heat supply supporting a low carbon future. MEL are working with the
Coal Authority to explore using heat from a planned mine water treatment scheme at
Dalkeith, one of the first pioneering mine water heat projects under consideration in
Scotland.
During this assessment there has been several barriers. The water precipitating out
of the shaft at Dalkeith has high levels of oxidised iron that will clog up a heat
exchanger or otherwise adhere to any heat exchange surface. Once it's been
through the treatment process this could drop, however levels will still be too high for
a heat exchanger. The best way to get the mine water is before the oxygen has had
time to react with the iron in the water. Unreacted iron is dissolved and passes
straight through the heat exchanger. As the water at Dalkeith arrives at the end of an
open channel it's fully oxygenated and unfortunately, unusable. Therefore, an option
is to drill down a new sealed shaft and pump up mine water that still has lots of iron,
but not oxygenated. This however has risks. Additionally, the cost of accessing the
water at this stage is highlighting that this may not be an option. 
If this is not a feasible option due to the costs and chemicals found within the mine
water, then MEL will undertake further studies into potential waste heat sources. The
council are aware that Dalkeith has the largest heat demand within Midlothian and is
also an area with high levels of fuel poverty, therefore this area and it’s surrounding
settlements (Eskbank, Woodburn, Bonnyrigg, Mayfield, Lingerwood and
Newtongrange) are a priority for a DNH. 
Page 162 of 238

Page 163

45 | P a g e
Figure 21: Area with Housing, Existing Networks and Heat Sources (Vattenfall, 2023) 
8.2.3 Zone 3 - Easterbush 
The current expansion of The University of Edinburgh’s Easter Bush Campus
includes a potential connection to the proposed advanced computing facility (AFC) at
this location. The new computer is called Exascale and is one of only a handful of its
kind globally. Funded by the Department of Science, Innovation and Technology
through UK Research and Innovation (UKRI), it will be managed by the University of
Edinburgh’s supercomputing centre. Installation of the first phase is due to start in
2025.
The ACF at Easter Bush has the potential to supply heat to the existing the
University of Edinburgh network at the campus and to extend to Beeslack High
School and Bilston, Straiton (figure 22). Beeslack is a new High School being built at
passivhaus standard. If MEL can demonstrate housing retrofit at Danderhall then
consideration can be given to further expansion to Loanhead and Straiton. 
Page 163 of 238

Page 164

46 | P a g e
Figure 22: DHN Expansion at Easterbush (Vattenfall, 2023) 
8.2.4 Zone 4 - Penicuik Estate 
Penicuik Estate is reforming itself and wants to produce renewable energy on the
estate to send to Penicuik Town. It is currently in the process of setting a 50-year
vision. The ambition is a leading rural business with a focus on the environment.
They currently heat their buildings with Biomass and they are exploring low carbon
options, alongside MEL, and wish to extend this down to Penicuik to supply both
existing and new build housing, in attempt to regenerate the town centre. They plan
to build around 400 new homes and a leisure facility within the Estate. 
If MEL can demonstrate the housing retrofit proposition in Danderhall then Penicuik
Estate could act as the potential heat source within Penicuik to connect schools and
existing council owned housing. This can be seen visually in figure 23. 
Page 164 of 238

Page 165

47 | P a g e
Figure 23: Area of Penicuik District Heat Network Investment (Vattenfall, 2023) 
Page 165 of 238

Page 166

48 | P a g e
9 Cross Boundary Opportunities 
9.1 Millerhill EfW 
In October 2022 Buro Happold completed a study to assess the heat network
opportunities across the Midlothian, East Lothian and Edinburgh local authority
areas. The case study provided a summary of a project to investigate cross-
boundary heat network opportunities using the analytical approaches set out in the
LHEES methodology. The analytical approaches outlined in the LHEES methodology
were modified here to consider potential heat network zones from a large heat
supply source perspective, and also to better include consideration of new
developments.
The opportunity presented in this case study is based around the Millerhill EfW plant
in Midlothian. This site is in Midlothian but is close to both East Lothian and the City
of Edinburgh. Figure 24 details the location of Millerhill in the context of nearby local
authority boundaries. As previously discussed, MEL is currently using heat from this
facility to heat new development at Shawfair, however the magnitude and relatively
low cost of heat available from Millerhill presents an opportunity to expand to supply
other local demands, potentially crossing local authority boundaries in future phases
of development.
Figure 24: Millerhill EfW in context to Local Authority boundaries (Buro Happold, 2022)
Three distinct potential zones, shown in figure 25, within the vicinity of Millerhill were
identified to take forward for further consideration as “cross-boundary” opportunities
in relation to heat networks. These combine existing demands with anticipated
demands from new development.
Page 166 of 238

Page 167

49 | P a g e
Figure 25: Potential Heat Zones across Midlothian and Edinburgh (Buro Happold, 2022) 
9.2 East Lothian 
East Lothian’s LHEES has signified potential major infrastructure opportunities which
would bring heat into Midlothian and vice versa. 
These opportunities include Cockenzie Power Station. The coastal location could
provide access to sea water for a sea source heat pump. The site development
provides an opportunity to align major heat network pipe routes with roadways,
before they are constructed. There is a pipe already in the ground underneath the A1
nearby Millerhill EfW which could potentially connect Midlothian with East Lothian.
An EfW plant owned by Viridor began operation in 2019 and is situated in the town of
Dunbar. They have a commitment to make up to 10 MW of heat available for local
use. To date this has not been accessed. There is potential to capture significantly
more waste heat. In a presentation given to East Lothian Council in late 2021 Viridor
indicated that the plant could satisfy the heating needs of 71,000 homes.
In line with Scottish Government policies to promote active travel, East Lothian
Council is preparing plans for an Active Travel Corridor, a combined cycle path and
walkway along the route of the A199 (old A1) from Dunbar to Tranent, a distance of
around 24km. With significant surplus heat in Dunbar as explained above, this
provides an opportunity to bring this heat towards centre of demand via a pipeline
beneath or alongside the proposed cycle path. 
Page 167 of 238

Page 168

50 | P a g e
10 Net Zero Solutions 
This report has outlined the main DHN zones; Shawfair/Danderhall, Dalkeith and
surrounding areas, Penicuik and Easterbush. Many existing properties within
these zones will also require energy efficiency improvements to reduce heat loss
alongside the DHN connection. These are areas that have both a substantial heat
demand alongside a potential source of waste heat. Areas out with these zones will
have to find an alternative source of heat. Individual heat pumps are expected to be
the main route to deliver net zero heat for a significant proportion of properties that
currently use fossil fuels and are unable to connect to a district heat network. This
may be due to their rural location or distance from neighbouring properties. For heat
pumps to be effective, the property is required to insulated to a high standard and
have a suitable outside area to place the heat pump itself. As discussed in the
baseline analysis, a low percentage of properties are eligible for a heat pump
depending if they are on or off gas. 
The top Data Zones where energy efficiency is likely to be a driver for fuel poverty
are Dalkeith, Mayfield and Newtongrange. In these areas a fabric first approach
could be taken to ensure that no method of low carbon heat installation will further
increase fuel poverty within the household. This approach will also mean that no
heat is wasted. 
A study undertaken by Cambridge University summarises the pathway that every
decision maker for every property needs to follow to reach a net zero solution. The
decisions they need to make may not be clear-cut, may involve complex analysis
and could involve significant expense or investment, however benefits include
warmer winters, improved health and lower and less volatile energy bills alongside
the benefit of a reduced your carbon footprint. It is therefore critical that the ‘decision
maker’ for each property is aware of their options. 
A key aspect of Midlothian’s Delivery Plan will be to identify the individuals linked
with each property who will likely have to make a decision on the future heating for
their property. Properties are either domestic or non-domestic and we expect the
decision makers fall into the following categories:
• Domestic – Homeowner, Midlothian Council, RSL’s or private landlord
• Non-Domestic – Midlothian Council, Businesses owner, private landlord or
other public sector landowner (NHS)
Once these individuals have been identified then it will be important to engage
effectively. For each decision maker a retrofitting guide could be provided with
information on how to make their homes more energy efficient and lower carbon.
The guide could set out a whole-house approach to retrofitting the most common
types of property in the particular zone. The guidance particularly focuses on
reducing carbon emissions from homes, as this will make a key contribution to our
net zero targets. Without the community taking action, it will not be possible for
Midlothian to reach net zero by 2023. 
Page 168 of 238

Page 169

51 | P a g e
Officers recognise that decision makers will have different budgets and needs,
particularly at a time when the cost of living is increasing rapidly and there is such
economic uncertainty. Ideally the guide would outline the steps that would be needed
to retrofit the property to a net zero carbon standard. It would take a phased
approach, so that individuals can start with the budget available to them. Staring with
no cost steps (such as reducing your thermostat, heating only the rooms that you are
using) to more expensive steps such as insulation measures. 
There are varying levels of engagement for decision makers regarding needs and
urgency to decarbonise their heating. Those responsible for multiple properties are
considerably more engaged with the need for action on heating. For the majority of
decision makers any urgency is linked with reducing overall energy costs rather than
a motivation to reduce their carbon footprint. The perceived costs and uncertainty
over the technology involved and the possibility of future grants schemes are a very
significant barrier to making progress on decarbonising heat.
The main responsibility for raising awareness will lie with the Scottish Government
via the Net Zero Nation Public Engagement Strategy. However, this will need to be
enhanced at a local level, with considerable reliance on community-led activities
coordinated by Midlothian Council in partnership with the Midlothian Climate Action
Hub. 
Page 169 of 238

Page 170

52 | P a g e
11 Next Steps 
Ongoing monitoring will be critical for the success of this strategy and delivery plan.
This will ensure key outcomes are achieved and allow for continuous improvements
to meet changing requirements and incorporate new information and data. The
accompanying Delivery Plan in section 13, will outline our 5-year plan for delivering
our key outcomes. Some examples of priority areas for development area: 
Complete Portfolio Energy Assessment Tool (PEAT) analysis: The output from
PEAT includes a package of recommended measures for each property, the SAP
rating improvement as a result of those measures being installed, as well as the total
cost of the measure and associated fuel and emissions savings. This will assist us in
improving energy efficiency and alleviating fuel poverty in our highlighted areas. 
Conduct Non-Domestic analysis: There have been some studies done across
Midlothian to assess the non- domestic stock.  The next steps will be reviewing these
studies and carrying out data analysis using the LHEES methodology and guidance,
including completion of the non-domestic baseline tool, to assess the non-domestic
stock. 
Community Engagement: After the initial community engagement exercise planned
for early 2024. Officers will work to identify the key ‘decision makers’ across
Midlothian and target energy efficiency engagement in line with the ‘Cambridge
approach’. 
The Local Heat and Energy Efficiency Strategy is seen as a live document and will
be regularly updated in line with changes to policies, targets, and actions, as well as
any new information and data. Every 5 years the strategy will be reviewed, and
delivery plan updated, to meet the requirements of the Local Heat and Energy
Efficiency Strategies (Scotland) Order 2022. 
Page 170 of 238

Page 171

53 | P a g e
12 Funding & Investment 
MEL will bring significant investment opportunities along with technical support to
assist with the progress of MLC’s heat network development. However, additional
funding will be needed for proposed decarbonisation work as the council will likely
not have the capital or revenue capacity to delivered on this scale.   
12.1 Scottish Government Funding 
Table 5 indicates the funding that is available to the Council and our stakeholders.
Noting that this my change alongside alterations to legislation and policy landscape. 
Table 5: Funding Summary
Name of Fund Summary Recipient 
Energy Efficiency
Scotland: Area Based
Schemes (EESABS)
Scottish Government awarded
funding to local authorities to develop
and deliver energy efficiency
programmes in areas with high levels
of fuel poverty. This funding is
blended with owners contributions
and funding from RSL’s who may
choose to insulate their homes at the
same time. 
Local Authorities,
RSL’s. 
Heat Network Fund Funded by Scottish Government to
support and develop heat networks.
Can offer 100% funding for feasibility
studies and up to 50% of Outline
Business Cases.
Local Authorities
Public Sector Heat
Decarbonisation Fund
Funded by Scottish Government via
Salix. Total of £20m to help public
sector decarbonise their heating
systems by replacing them with zero
direct emissions systems, as well as
for retrofit energy efficiency measures
to buildings.
Local Authorities
Heat Network Support
Unit
Funded by Scottish Government to
support and develop heat networks.
Can offer 100% funding for feasibility
studies and up to 50% of Outline
Business Cases.
Local Authorities
Social Housing Net Zero
Heat Fund
Funded by Scottish Government and
also open to other social landlords.
For low carbon heat and fabric first
approach.
Local Authorities
and RSL’s
Energy Redress Scheme The Energy Saving Trust manages
the Energy Redress Scheme that
redistributes the fines implemented on
energy suppliers. Not for profit
organisations such as Housing
RSL’s and non
profit organisations 
Page 171 of 238

Page 172

54 | P a g e
Associations are eligible to apply for
fabric, low-carbon heating and solar
measures with the percentage of
funding variable depending on the
project.
Energy Company
Obligation (ECO4)
This scheme provides match funding
with support for lower income and
vulnerable-to-cold domestic owner-
occupiers, private sector tenants and
social tenants, depending on eligibility
criteria.
Home owners,
private tenants
and social tenants.
District heating Loan fund This fund targets support for local
authorities, registered social
landlords, businesses, Energy
Services Companies (ESCOs), and
legally constituted community groups.
It offers capital funding support for
heat networks/district heating
generated by renewables fuel through
unsecured loans of up to £1 million
towards capital measures for heat
network projects. Large stand-alone
anchor load buildings can also be
supported. The interest rate is
typically 3.5% and repayable over 10-
15 years.
Midlothian Council,
RSL’s,
businesses,
ESCOs and
community groups
Private Rented Sector
Landlord Loan
Scottish Government funded loan that
helps landlords improve the energy
efficiency of their properties and meet
minimum standards
Private Landlords
Home Energy Scotland
Grant and Loan
Funding from the Scottish
government, administered by Home
Energy Scotland to provide grants
and interest free loans for energy
efficiency improvement and
renewable technology
Private
homeowners,
private tenants. 
Warmer Homes Scotland Funding from the Scottish
government, administered by
Warmworks. Fully funded measures
for energy efficiency improvements
and heating. This is means tested. 
Homeowners,
private tenants. 
12.2 Alternative funding options 
Comfort as a service is a potential alternative funding model for MLC and MEL. With
this model the capital costs from installed measures are covered over time through
‘comfort’ or heat payment from the tenants to the social housing provider. In some
cases, the social housing provider can partner with a billing contractor to remain at
arms-length and not be drawn into becoming an ‘energy supplier’. The concept is
based on the investor, the property owner, paying the capital costs for fabric and
low-carbon heating measures through the heating bill savings that the tenants would
Page 172 of 238

Page 173

55 | P a g e
be making in the property now that it is more energy efficient. This means that
tenants do not benefit from a reduction in running costs but from the increased
comfort levels in the improved properties. In addition, the tenant benefits from
security of supply as the fluctuation of external energy costs has less influence on a
property that has been fully insulated. The ‘comfort’ costs can also remain static as
they are based on initial capital costs and not as influenced by energy costs. 
This is a concept that will be considered by MLC and MEL to help fund proposed
projects. 
Page 173 of 238

Page 174

56 | P a g e
13 Delivery Plan 
Action Stakeholders How we will get
there
Timescale Progress Funding  Benefit
Turn heat on at
Millerhill Energy
Centre to take
heat to Shawfair
MEL, Vattenfall,
FCC
Ensure low carbon
heat is available for
the heat network
and continue to
work towards
taking heat from
the EfW plant
(expected 2025).
By Summer 2024 Heat Network
taking heat to
connected homes
Scottish
Government’s
Low Carbon
Infrastructure
Transformation
Project (LCITP).
This initial phase
of the network is
expected to save
over 2,500 tonnes
of CO2 per year,
the equivalent of
taking 1,200 cars
off the road.
Assessment of
Non-domestic
stock
MLC, Aether Use the Energy
Saving Trust’s
‘Non-Domestic
Analytics’ (NDA) to
provide a strategic
overview of the
non-domestic
estate in
Midlothian. LHEES
Officer will also
recognise non-
domestic work
undertaken via
Aether (CC
Consultants).
Completion within
6 months of
LHEES adoption 
Assessment of all
non-domestic
stock completed.
NA This supports
understanding of
the breakdown of
building
typologies and by
other criteria,
such as fuel type,
property age, or
floor area. The
approach
developed is
intended to
support the
characterisation
of the non-
domestic
building stock.
Run all Delivery
Areas identified
in the LHEES
through Energy
MLC,
Changeworks,
EST
Run all identified
Delivery Areas
through PEAT
analysis to better
Completion within
6 months of
LHEES adoption 
Completion of
PEAT analysis for
all LHEES
Delivery Areas
NA The output from
PEAT includes a
package of
recommended
Page 174 of 238

Page 175

57 | P a g e
Saving Trust’s
Portfolio Energy
Asset Tool
(PEAT)
quantify those
areas that present
the highest
opportunity. 
measures for
each property,
the SAP rating
improvement as a
result of those
measures being
installed, as well
as the total cost
of the measure
and associated
fuel and
emissions
savings. This will
assist us in
improving energy
efficiency and
alleviating fuel
poverty in our
highlighted areas. 
Complete
Building
Assessment
Reports (BARs)
for required
MLC owned
buildings 
MLC Complete Building
Assessment
Reports for
required MLC
owned buildings,
prioritising those
that are of a high
suitability for heat
network connection
and are located
within indicative
HNZs. Facilitate
and support other
public sector
organisations in
Completion within
1 year of LHEES
adoption 
Count of number
of BARs
completed.
NA Improved
‘confidence per
MWh’ level within
indicative HNZs 
Page 175 of 238

Page 176

58 | P a g e
Midlothian to
complete these
Commencement
of a business
case for
expansion of the
Shawfair project
to connect
Council housing
ownerships in
Danderhall
MLC, Vattenfall,
MEL,
Changeworks
Engage MLC
colleagues and
relevant not for
profit organisation
Changeworks for
collaboration.
Project
development and
procurement for
delivery
undertaken via
MEL. 
Commencement
within 6 months
of LHEES
adoption. 
Work on business
case is underway
alongside a
customer journey. 
TBC By successfully
implementing
replacement low
carbon heating to
Council owned
houses at
Danderhall MLC
can replicate this
within other areas
of the Council. 
Develop and
connect
Shawfair Town
expansion to
Newton
Wellington Farm
MLC, MEL,
Vattenfall
MEL has
concluded a plot
connection
agreement with
Cala Homes (East
of Scotland) as the
first additional heat
load, the Newton
and Wellington
Farms
development, and
the first heat main
extension off of the
Shawfair main
spine. 
Completion within
5 years of
LHEES adoption
New homes
connected to the
heat network as
per the plot
connection
agreement. 
Self funded. This being the
first heat main
extension off of
the Shawfair main
spine.
Commencement
of business
case for a DHN
in the heat zone
of Dalkeith and
MLC, MEL,
Vattenfall 
Conduct
assessments to
determine where
waste heat can be
sources to provide
Within 1 year of
LHEES adoption.
Commencement
of business case
for a DHN at
Dalkeith and
TBC Dalkeith has the
largest heat
demand within
Midlothian and is
also an area with
Page 176 of 238

Page 177

59 | P a g e
surrounding
settlements. 
heat to Dalkeith
(inclusive of council
owned buildings).
This will be
followed by the
development of an
official business
case. 
surrounding
areas.
high levels of fuel
poverty, therefore
this area and it’s
surrounding
settlements are a
priority for a DHN.
Commencement
of business
case for
expansion of
UoE Easter
Bush Campus to
connect new
build
developments
and Council
housing
ownerships in
Loanhead
MLC, MEL,
Vattenfall, UofE
Create proposition
for shared value
between MEL and 
UoE to gain access
to UoE energy
sources. Ensure
connection to old
and new Midlothian
Council buildings
and
demonstrate
housing retrofit
proposition in
Danderhall. Finally,
consider business
case for DHN
expansion to
Loanhead. 
Commencement
within 3 years of
LHEES adoption.
Commencement
of a business
case for a DHN at
Easterbush
TBC Opportunity
coordination with
existing DHN that
creates
opportunity for
growth and asset
decarbonisation
for Midlothian
Build a business
case for
connecting
renewable
energy from
Penicuik Estate
to Penicuik
Town
MLC, MEL,
Vattenfall,
Penicuik Estate
MEL will support
the Penicuik Estate
development to
identify appropriate
energy integration
to lever in power
generation which
can connect
Commencement
within 5 years of
LHEES adoption.
Determine
whether the site
is ready for a
DHN connection
TBC Opportunity for
coordination a
private entity to
create opportunity
for growth and
asset
decarbonisation
for Midlothian’s
Page 177 of 238

Page 178

60 | P a g e
Penicuik estate to
Penicuik Town,
inclusive of any
new development,
while using Council
infrastructure as
anchor loads. 
new and existing
buildings. 
Undertake in
depth PEAT
study for
Midlothian
Council owned
Social Housing
MLC,
Changeworks
Run all Council
Owned Social
housing properties
through PEAT
analysis to better
quantify those
areas that present
the highest
opportunity.
Completion within
6 months of
LHEES adoption.
Completion of
PEAT analysis for
all Council
Owned Social
Housing.
NA The output from
PEAT includes a
package of
recommended
measures for
each property,
the SAP rating
improvement as a
result of those
measures being
installed, as well
as the total cost. 
Create a
working group
for cross
boundary DHN
potential across,
Midlothian,
Edinburgh and
East Lothian
MLC, MEL,
Vattenfall,
Edinburgh
Council, East
Lothian Council
Engage with
nominated
stakeholders to
discuss DHN plans
across the district
to determine cross
boundary potential. 
Ongoing Identification of
LHEES related
opportunities and
MEL principles
that exist across
local authority
boundaries
TBC Working across
boundaries
enables
individuals,
organisations and
other entities to
work together and
learn from each
other. DHNs don’t
adhere to local
government
boundaries and
focus should be
on geographical
boundaries. 
Page 178 of 238

Page 179

61 | P a g e
Identify the key
‘decision
makers’ across
Midlothian and
target energy
efficiency
engagement
MLC,
Changeworks,
MVA
Identify the key
‘decision makers’
across Midlothian
and then create a
pathway that every
decision maker for
every property
needs to follow to
reach a net zero
solution.
Completion within
1 year of LHEES
adoption.
A comprehensive
engagement plan
for Midlothian will
be developed.
TBC Officers
recognise that
decision makers
will have different
budgets and
needs,
particularly at a
time when the
cost of living is
increasing rapidly
and there is such
economic
uncertainty.
Ideally our
engagement will
outline steps
needed to retrofit
said property to a
net zero carbon
standard
Ensure the
LHEES is
embedded into
the development
and delivery of
Council policy
on energy,
housing,
planning, and
development.
MLC Work with MLC
partners to ensure
LHEES is
embedded into the
delivery of the
- Local Housing
Strategy
- Local
Development Plan
- Single Midlothian
Plan
- Midlothian’s
Climate Change
Strategy
Ongoing Publication of
strategies
relevant to the
LHEES with the
ambitions of the
LHEES
embedded within
them.
NA Consideration of
the relevant local
and national
policy and
strategies that are
relevant to the
LHEES, making
sure that LHEES
runs in line with
these strategies
and adheres to
any key targets
Page 179 of 238

Page 180

62 | P a g e
Direct funding
and advice for
retrofit through
EES:ABS and
wider funding
sources into
Delivery Areas
identified within
the LHEES.
MLC,
Changeworks
Ensure that the
EES:ABS
programme and
other
funding/programme
opportunities are
maximised and
continue in areas
identified for the
Poor Energy
Efficiency as a
Driver of Fuel
Poverty
consideration in the
LHEES.
Ongoing Amount of
EES:ABS funding
spent.
Number of
properties
successfully
treated. 
EES:ABS funding
secured annually. 
Positive impact
on fuel poverty in
targeted
properties. 
Page 180 of 238

Page 181

63 | P a g e
Appendix 1 – Stakeholder Engagement 
Internal Engagement
One to one meetings have been held with relevant internal Council stakeholders. These discussions involved an overview of the
LHEES context and outputs, outlining whether the officer’s area of work would have relevant inputs to LHEES, or subsequently be
impacted by LHEES. Stakeholders were then ranked by ‘power’ and ‘interest’, in relation to the strategy content, allowing a detailed
stakeholder map to be produced. This stakeholder map found, in Figure 1, highlights internal stakeholders in orange. This is a
working map and stakeholders will move depending on their influence and interest at each stage of the strategy. 
Figure 26: Stakeholder Map
Interest
Influence
Internal External
Housing Private Housing
Developers
LDP Planning
Economic
Development
Council
Management Team
Edinburgh Council
Midlothian Energy Sco�sh Government
East Lothian Council
Poverty?
GIS Team
Procurement
Educa�on/ children's
services
Changeworks
Corporate Solu�ons
Social Housing
Associa�ons
Low Carbon Heat
Installer
Community Councils
SPEN
Midlothian Council LHEES Stakeholder Map
Resources
Communica�ons
Environmental
Health
ShawfairLLP
The Coal AuthorityOther Local
Authori�es
Page 181 of 238

Page 182

64 | P a g e
An LHEES working group has been developed, compromising of Midlothian Council employees (LHEES, Estates and Social
Housing Officers as these roles impact directly on work relating to heat and energy efficiency), MEL, Vattenfall and Changeworks
representatives. Midlothian Officers are eager to work in conjunction with stakeholders to ensure that work is being done efficiently.
A tenant having one point of contact for fabric improvements and low carbon heat modifications will make the process easier for the
tenant. A focus of this working group has been Danderhall Town. 
External Engagement 
Due to time constraints, one to one meetings were not possible for external engagement. This was due to the quantity of individuals
and groups that we wanted to engage with. Our LHEES Officer has engaged with Midlothian Climate Emergency Group, who
compromise of a range of key primary Midlothian community stakeholders including, Community Council representatives,
Midlothian Voluntary Action, Skills Development, Nature Scot, MEL and MLC. Initial engagement has included presenting LHEES
stage 1-4 findings and informing the group on heat decarbonisation and energy efficiency measures. Engagement with this group
will continue and is seen as a key means of identifying issues and accessing further key local and community partners to develop
and strengthen ‘grass rots’ external engagement. 
1.1.1 Registered Social Landlord Consultation 
Table 6, below shows that there are 10 RSLs who own housing in Midlothian. Midlothian Council (6,912 homes), Melville Housing
Association (1,959 homes) and Castle Rock Edinvar Housing Association (1009 homes) all have a significant supply of housing in
the local area whereas the other providers have a smaller number of units, and are often providers of specialist housing, such as
retirement housing. 
Page 182 of 238

Page 183

65 | P a g e
Table 6: RSL Stock Profile
Type of provision  Total No. Units  Percentage of Total % 
Ark Housing Association  6  0.05
Bield Housing
Association 
116  1.00
Blackwood Housing
Association 
23  0.20
Castle Rock Edinvar
Housing Association 
1009  9.00
Dunedin Canmore
Housing Association 
98  1.00
Link Housing
Association 
20  0.10 
Melville Housing
Association 
1959  19.0 
Midlothian Council  6912  68.0 
Trust Housing
Association 
35  0.30 
Viewpoint Housing
Association 
34  0.30 
Total  10,212  100.00% 
RSL’s in Midlothian tend to have older properties and have concerns about energy efficiency and decarbonisation. A consultation
has been shared with RSL’s to raise awareness of LHEES and it’s priorities, and to gain an understanding of how RSL’s are
planning to decarbonise their stock. 
1.1.2 Business Engagement 
Midlothian Council has an active Business Support team and there is a lot of work going on to assist and educate businesses about
means of reducing their carbon footprint and adopting more energy efficient practices and transition to low carbon heat. This work
is summarised in table 7. 
Page 183 of 238

Page 184

66 | P a g e
Table 7: Midlothian Business Engagement Summary
Action Aim
Midlothian Business Green
Pledge
Business Gateway Midlothian are offering local businesses the
opportunity to sign up to their ‘Green Pledge’, a concept to encourage
businesses to become more carbon friendly. If businesses sign up then
they can use the ‘Green pledge’ logo on their website as long as they
agree to the following: 
• Switch to a 100% renewable energy supplier at contract renewal
or earlier
• Review and reduce your energy use such as switching off IT at
the end of the day, using energy efficient LED light bulbs,
switching your heating down a degree.
• Encourage your employees to use active transport such as
walking or cycling to work
• Review your work practices – encourage work from home where
possible
• Switch to green products – paper instead of plastic wherever
possible
• Re-use and recycle equipment, waste and products 
68 businesses have signed up to the pledge so far. 
The Energy Training Academy The Energy Training Academy is a community interest company
specialising in providing high-quality training and education in the gas
and renewables industry. A team of experienced and certified
instructors are dedicated to ensuring that all students receive the
knowledge and hands-on training they need to succeed in their careers. 
This is situated in Midlothian and is in place to train individuals in
renewables and energy efficiency to assist them in finding local
employment. 
Vattenfall will have a suite in this facility, opening in spring 2024 where
they will educate individuals on DHNs. 
The Green Transition Fund The Green Transition Fund is designed to support businesses that were
implementing a process or business improvement that would reduce
carbon emissions. The maximum grant value is £20K. This is funded by
Page 184 of 238

Page 185

67 | P a g e
Local Authority Covid Economic Recovery fund. Currently the full
amount of the fund has been spent with over subscription, showing a
clear appetite for the SME base in Midlothian to generate emission and
costs savings through green projects.
20 applications have been received with 11 grants awarded. 
Midlothian business survey, circulated in September 2023, asked businesses a range of questions regarding Net Zero commitments. 18
businesses (6.5%) in Midlothian responded, a summary of the results can be found in table 8 below: 
Table 8: Business Consultation Results
Question Answer Options Response in Percentage % (No.)
How would you describe your
understanding of Government
targets relating to Net Zero?
A – Clear Understanding of how this will
impact my business
B – Reasonable understanding but would
like more information on the specific
impact on my business
C – Limited/no understanding on how my
business will be impacted
A- 27.78 (5)
B- 33.33 (6)
C- 38.89 (7)
Have you made any changes to
your business in regard to Net
Zero? 
A - Yes, have installed zero/low carbon
heating system
B - Yes, other action to reduce carbon
emissions
C - No
D – Other (specify)
A- 00.00 (0)
B- 27.78 (5)
C- 50.00 (9)
D- 16.67 (3)
Other: Reusable packaging and
EV’s. 
Have you engaged with any
government support initiatives
with regards to the transition to
net zero?
A – Yes, Business Energy Scotland
B – Yes, Zero Waste Scotland
C – No
D – Other (Specify)
A- 00.00 (0)
B- 05.56 (1)
C- 70.78 (14)
D- 16.67 (3)
Other: Business gateway
Have you signed the Midlothian
Business Green Pledge?
A – Yes
B – No 
A- 27.78 (5)
B- 72.22 (13)
Page 185 of 238

Page 186

68 | P a g e
Do you feel enough support is
available to you with regard to the
impact the transition to Net Zero
will have on your business? 
A - Yes, and I don’t need any more
information/support
B – Yes, but I would like access to
ongoing information/support
C – No 
A- 44.44 (8)
B- 11.11 (2)
C- 44.44 (8) 
Although a small proportion of businesses responded to the consultation, we can still see trends within the results. 0% of
respondents had installed a low carbon heating system and only 50% had introduced any carbon saving measures, this highlights
the need for funding and support for these businesses to make improvements. This is highlighted in the results as 70% of
respondents had received no support from governing bodies. LHEES will focus business engagement on support and awareness to
assist businesses on the path to Net Zero. 
1.1.3 Community Engagement 
Community engagement is important for the successful delivery of LHEES. The community has been consulted on Net Zero issues
in relation to the Local Development Plan (LDP) work. A full LHEES consultation will be completed early 2024. The LHEES Lead
Officer has engages with council tenants to raise awareness of the consultation to come. Section 8, outlining potential delivery
zones, will allow council officers to focus their engagement on targeted areas relevant to decarbonisation projects. 
1.1.4  Private Landlords 
Table 5 shows the number of private lets advertised in Midlothian from 2019-2020. Noting that lets within the private rented sector
were heavily impacted by the Covid pandemic in 2020 and continued to be so into 2021/22. The LHEES lead has engaged with
private sector landlords to raise awareness of LHEES and the support available to landlords, alongside raising awareness of when
the final strategy would be published.
Page 186 of 238

Page 187

69 | P a g e
Table 9: Number of private sector lets in Midlothian 2019-2020
Year  2019  2020 
No. of lets  270  131 
1.1.5 Community Action Hub 
The Midlothian Climate Action Network have been given funding from the Scottish Government for a staffed Climate Action Hub.
The Hub will support a collaborative effort focused on community-led climate action and adaptation within the region. Early actions
by the Hub will include opening the first round of a seed funding grant programme and delivery of four energy efficiency roadshow
events across the county region.  These workstreams will increase awareness and understanding of climate change while providing
sharing and learning opportunities to promote positive community efforts.
This facility will provide a location for engagement surrounding LHEES priorities. 
Appendix 2 -  LHEES Considerations 
2.1 District Heat Networks (DHN) 
A heat network, often called district heating, is a distribution system of insulated pipes, taking heat from a central source and
delivering it to a number of domestic or non-domestic buildings. DHN’s can cover a large area such as a town or sometimes cities,
however often they are local and supply a small cluster of buildings. District heating has a number of advantages compared to
individual heating systems. They are more energy efficient, as typically they produce both heat and electricity in a combined heat
and power plant, this has an added benefit of reducing greenhouse gas emissions. Due to these systems using less fuel to heat a
greater quantity of buildings compared with individual boilers, they are more cost effective and building owners can see an average
25% decrease in their heating bills (Heat Network Support, 2023). 
Page 187 of 238

Page 188

70 | P a g e
The Heat Networks (Scotland) Act 2021 (the Act) was passed in February 2021. The Act aims to accelerate the deployment of heat
networks in Scotland setting ambitious targets for the amount of heat to be supplied by heat networks (2.6 Terawatt hours (TWh) of
output by 2027 and 6 TWh of output by 2030 – 3% and 8% respectively of current heat supply). A large focus of LHEES will be
focused on our work with Vattenfall, assessing the suitability for heat networks (Scottish Government, 2021). 
2.2 Off-gas grid buildings 
Off-gas grid buildings are those that do not have a gas connection installed. Therefore, the main heat source is often via electricity
or oil, or in some cases ASHP or Biomass technologies are used. Rural areas are more likely to be off of the gas grid and often find
higher levels of fuel poverty compared to those connected to gas due to the high cost of electricity. 
The approach used to identify potential off-gas heat decarbonisation opportunities involves grouping properties into 4 categories,
primarily from the perspective of heat pump suitability. Category 0 identifies properties that currently have a low or zero emissions
heating system. Categories 1 to 3 outline potential pathways for heat decarbonisation for all other properties. 
Category 1: Those considered highly suited for heat pump retrofit (i.e. well insulated properties with a wet heating system,
excluding any consideration of electricity network impacts or costs of any network upgrades)
Category 2: Those with secondary potential for heat pump retrofit (i.e. properties in need of moderate fabric upgrade and / or
addition of wet distribution system to be heat pump ready).
Category 3: Those with tertiary potential for heat pump retrofit (i.e. properties in need of significant fabric upgrade to be heat pump
ready) or those less suited to heat pump technology, with electric (storage or direct) or biomass likely to be the most viable
decarbonisation technology.
The Categories used here are suggested groupings only, proving an approach to identify subsets of properties that share similar
characteristics and may require similar retrofit action. The Categories do not imply prioritisation of one group over another. 
Page 188 of 238

Page 189

71 | P a g e
2.3 On-Gas Grid Buildings 
On-gas grid buildings are those that have a gas connection installed and gas is often used for heating and cooking. Similar to the
off-gas grid analysis, the approach used to identify potential off-gas heat decarbonisation opportunities involves grouping properties
into 4 categories. Category 0 identifies properties that currently have a low or zero emissions heating system. Categories 1 to 3
group all other properties in terms of heat pump suitability. 
Category 1: Those considered highly suited for heat pump retrofit (i.e. well insulated properties with a wet heating system,
excluding any consideration of electricity network impacts or costs of any network upgrades), 
Category 2: Those with secondary potential for heat pump retrofit (i.e. properties in need of moderate fabric upgrade and / or
addition of wet distribution system to be heat pump ready), 
Category 3: Those with tertiary potential for heat pump retrofit (i.e. properties in need of significant fabric upgrade to be heat pump
ready). There is no sub-categorisation of Category 3 properties for On-Gas Grid as the 
It is important to assess for potential retrofit of on-gas areas to comply with decarbonisation targets. 
2.4 Poor building energy efficiency 
Energy efficient is a term used to explain using less energy to perform the same task. For example, using energy efficient light
bulbs will use less energy than a normal bulb when ran for the same length of time. There are several benefits from becoming
energy efficient, including reducing greenhouse gas emissions, reducing energy demand and lowering costs (IEA, 2023). Ensuring
that individuals in a household or building are carrying out energy efficient practices is important to ensure energy is not being
wasted.
Building energy efficiency refers to the fabric of the property. This includes the insulation (wall, floor and loft) and glazing type. The
better the level of building efficiency, the less energy is required to heat the home. 
Page 189 of 238

Page 190

72 | P a g e
2.5 Poor building energy efficiency as a driver for fuel poverty 
Fuel poverty is the condition by which a household is unable to afford to heat their home to a comfortable temperature. It is caused
by low income, high fuel prices, poor energy efficiency and unaffordable housing prices. The Fuel Poverty Act was passed in 2019
and sets statutory targets for reducing fuel poverty, introduced a new definition which aligned fuel poverty more closely with relative
income poverty and required Scottish ministers to produce a comprehensive strategy to show how they intend to meet the targets.
Fuel poverty is now defined by the Scottish Government as any household spending more than 10% (20% for extreme fuel poverty)
of their income on energy, after housing costs have been deducted. New figures published by the Scottish Government show that
in 2018 a quarter of households in Scotland were in fuel poverty at around 619,000 while one in ten were in extreme fuel poverty at
279,000 (Scottish government, 2021). 
Fuel poverty can be alleviated by improving household income and their ability to comfortably pay bills, reduce fuel costs, and most
importantly reducing energy consumption by improving energy efficiency. Energy efficiency is a key driver for fuel poverty. By
improving energy efficiency in the home, the householder will be able to utilise their energy more efficiently, reducing energy
wastage and overall energy costs. 
2.6 Mixed-tenure, mixed-use and historic buildings 
Mixed-tenure and mixed-use buildings could include a mixture of owner occupied, private rented and social housing, and also non-
domestic uses, or simply multiple ownership within the same tenure. Historic buildings include the buildings that are within
conservation areas or those that are listed buildings. These categories may require established alternative approaches and
regulation for the installation of low carbon heat and energy efficiency solutions as there could be more than one owner/stakeholder
involved. 
2.7 Low Carbon Technologies 
Page 190 of 238

Page 191

73 | P a g e
Before low carbon heat technology is considered, a fabric first approach is important. This involves insulating a property to make it
more energy efficient before introducing new heat technology. Figure 3 highlights where a property will lose its heat, indicating the
importance of sound insulation. Often low carbon heat technology requires a property to be well insulation, otherwise the property
will not be heated adequately. Required insulation includes, loft, underfloor and wall. While improved glazing and draft proofing is
also important. 
Figure 27: Home Heat Loss (Scottish Energy Grants, 2018) 
Once a property is adequately insulated, consideration can be given to low carbon heat technology. A heat pump captures heat
from outside and moves it into the property. It uses electricity to do this, but the heat energy delivered to the property is much more
than the electrical energy used to power the system. As a heat pump captures heat that is already present in the environment, the
system itself does not burn any fuel and therefore emits no carbon dioxide. There are two main types of heat pump, ground and air,
and both pumps can deliver both heat and hot water to a building. Heat pumps are more efficient than other heating systems
because the amount of heat they produce is more than the amount of electricity they use. 
Biomass boilers are also an option for low carbon heating. Biomass is a renewable energy source, generated from burning wood,
plants and other organic matter, such as manure or household waste. It releases carbon dioxide when burned, but considerably
less than fossil fuels. Biomass heating systems burn wood pellets, chips or logs to provide warmth in a single room or to power
central heating and hot water boilers. It is important that the fuel sources is locally sourced, to ensure that the system is as
environmentally sustainable as possible. 
Page 191 of 238

Page 192

74 | P a g e
Hydrogen could be a potential frontrunner for heating homes in the future. It is suggested that hydrogen will be used in areas less
suited to electrification or unsuitable for heat pumps. The main role for hydrogen currently only appears to be in areas like shipping
and hard-to-decarbonise parts of industry. Currently, there is no blueprint for a conversion of the gas grid to hydrogen anywhere in the world.
Therefore, hydrogen could be a low carbon option in the future but not something that is ready to be rolled out nationally, and therefore won’t
be considered within the LHEES.   
Page 192 of 238

Page 193

Midlothian Council
Tuesday 7 May 2024
Item No 8.7 
Midlothian Council British Sign Language (BSL) Plan 2024-2030 
Report by Saty Kaur, Chief Officer Corporate Solutions 
Report for Decision 
1 Recommendations 
Council is asked to approve the Midlothian Council British Sign
Language (BSL) Plan 2024-2030. 
2 Purpose of Report/Executive Summary 
The purpose of the report is to present to Council the Midlothian
Council BSL Plan 2024-2030, which describes the actions the Council
will take to promote the use and understanding of BSL throughout the
Midlothian area, and to provide local BSL users with equal access to
support and services over the next six years. 
Date: 9 April 2024 
Report Contact: 
Scott Williamson, Equality and Diversity Officer 
scott.williamson@midlothian.gov.uk 
Page 193 of 238

Page 194

2 
3 Background/Main Body of Report 
3.1 The British Sign Language (Scotland) Act 2015 was passed by the
Scottish Parliament on 17 September 2015 and obtained Royal Assent
on 22 October 2015. The Act aims to make Scotland the best place in
the world for BSL users to live, work, study and visit. 
3.2 Every six years, the Scottish Government publishes a national plan
setting out its priorities and actions for ensuring that BSL users enjoy
equal access, opportunity, representation and inclusion. 
3.3 Listed authorities (such as Midlothian Council) are required to develop
their own plans, consistent with the aims of the most recent national
plan and reflective of local needs and circumstances. In 2018,
Midlothian Council published the Midlothian Council BSL Plan 2018-
2024, which shared the long-term goals of the BSL National Plan 2017-
2023. 
3.4 In November 2023, the Scottish Government published its second
national plan, the BSL National Plan 2023-2029. Listed authorities were
given six months to create their second local BSL plans and publish
final versions in both BSL and English. 
3.5 Listed authorities must consult with BSL users and their
representatives during the development of their plans. In March 2024,
Midlothian Council and the British Deaf Association held a public
engagement event in Dalkeith where members of the local BSL
community provided their feedback on a draft version of the plan
presented in this report. In response to their input, several actions were
revised and added to ensure that the plan reflects the expressed
wishes of BSL users in the Midlothian Council area. 
3.6 In compliance with the BSL (Scotland) Act 2015, this plan will also be
published in BSL. The BSL version of the 2018-2024 plan is attached
as an appendix to this report. 
3.7 According to the 2011 Scottish census, 233 people in Midlothian
Council area used BSL at home. More recent figures will be available
when the relevant data from the 2022 census is released.   
Page 194 of 238

Page 195

3 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
The Scottish Government has allocated no additional funding to
support the delivery of local BSL plans.   
4.2 Digital 
There are no digital issues arising from this report. 
4.3 Risk 
The Council has a statutory duty to comply with the British Sign
Language (Scotland) Act 2015.   
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
An Integrated Impact Assessment (IIA) has been completed for this
report. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Background information/Links 
Page 195 of 238

Page 196

4 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
‘Individuals and communities have improved health and skills for
learning, life and work’ 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
This report is not directly relevant to delivering best value. 
A.5 Involving Communities and Other Stakeholders 
Development of the Midlothian Council BSL Plan 2024-2030 was
informed by consultation with members of the local BSL community at
a public event in Dalkeith on 22 March 2024. The event was attended
by Midlothian residents who use BSL and their families, Officers from a
range of Council services, and representatives of NHS Lothian and the
British Deaf Association. Communication support was provided by fully
qualified and accredited BSL interpreters. 
Key issues raised at the event included improving the level of BSL
provision for school pupils and their families, increasing training and
awareness raising for staff in public-facing roles, and providing
information and guidance on important topics in BSL on the Council
website. The draft plan was consequently adapted to more fully
incorporate the concerns of the BSL community in Midlothian. 
Page 196 of 238

Page 197

5 
A BSL User Group, composed of local BSL users, will be established to
ensure consistent community engagement throughout the duration of
the plan. 
Relevant Council services were consulted on actions within their areas
over March and April 2024. Support will continue to be offered to these
services to promote a cooperative and collaborative approach to
implementing the plan. 
A.6 Impact on Performance and Outcomes 
Delivery of the plan will improve performance and outcomes related to
equality, diversity and human rights. 
A.7 Adopting a Preventative Approach 
The actions contained in the plan constitute a proactive, preventative
approach to equality, diversity and human rights. 
A.8 Supporting Sustainable Development 
This report is not directly relevant to supporting sustainable
development.   
Page 197 of 238

Page 198

6 
APPENDIX B 
Background Papers/Resource Links 
Midlothian Council BSL Plan 2018-2024 [BSL Version] 
Midlothian Council BSL Plan 2018-2024 [English Version] 
BSL National Plan 2023-2029 
Page 198 of 238

Page 199

Midlothian Council
British Sign Language (BSL) 
Plan 
2024-2030 
Page 199 of 238

Page 200

Contents 
SECTION 1  Page 
Contents 
SECTION 2 
Introduction 1 
SECTION 3 
Midlothian Council BSL Plan 2018-2024 Progress Update 2 
SECTION 4 
Executive Summary 3 
SECTION 5: MIDLOTHIAN COUNCIL BSL PLAN 2024-2030 
5.1:  BSL Accessibility 5
5.2:  Children, Young People and their Families 6
5.3:  Access to Employment 7
5.4:  Health and Wellbeing 8
5.5:  Celebrating BSL Culture 8
5.6: Transport  9
5.7:  Democratic Participation  9 
SECTION 6 
Monitoring and Reporting 10 
Page 200 of 238

Page 201

1
SECTION 2: Introduction 
This document is the English version of the British Sign
Language (BSL) Plan for Midlothian Council 2024-2030. The
BSL version is available on the Council website. 
The British Sign Language (BSL) (Scotland) Act 2015 requires public bodies in
Scotland to publish plans every six years, demonstrating how they will support and
promote BSL. 
In 2018, Midlothian Council published its first BSL plan. The plan set out the actions
the Council would take to provide local BSL users* with equal access to support and
services over the years 2018-2024. 
This new plan, for the years 2024-2030, reaffirms our ongoing commitment to make
Midlothian a more inclusive place for BSL users to live, work, study and visit. It aims
to build on the progress of the last six years and also to address additional issues that
BSL users have told us are important to them. 
The actions contained in this plan align with the long-term goals of the Scottish
Government’s BSL National Plan 2023-2029, which were developed in partnership
with the BSL community. 
This plan was finalised after consultation with BSL users in the Midlothian Council
area. 
*‘BSL users’ refers to D/deaf and/or Deafblind people (those who receive the language
in a tactile form due to sight loss) whose first or preferred language is British Sign
Language.  
Page 201 of 238

Page 202

2
SECTION 3: 2018-2024 Progress Update 
In 2018, Midlothian Council published its first BSL plan, which set out the actions the
Council would take to provide BSL users in Midlothian with equal access to support
and services over the years 2018-2024. This plan is available on the Council website
in both BSL and English. 
Progress has been accomplished in several areas of the first plan, with other actions
continued for delivery in the 2024-2030 plan. Key achievements from the first plan
include: 
✓ Highlighting the ContactScotlandBSL video interpreting relay service on the
Council website. 
✓ Reviewing the level of training required by interpreters, support staff and
teachers in the education system. 
✓ Promoting awareness of BSL and training opportunities for D/deaf children and
their families from the first diagnosis and throughout their childhood and school
years. 
✓ Requiring interpreters for all face-to-face meetings and events attended by
D/deaf parents and carers. 
✓ Encouraging school pupils to engage with services and activities aimed at
supporting their transition to further education, training or employment.   
Page 202 of 238

Page 203

3
SECTION 4: Executive Summary 
The Midlothian Council BSL Plan 2024-2030 is based on the following long-term
goals of the BSL National Plan 2023-2029: 
BSL Accessibility 
Children, Young People and their Families 
Access to Employment 
Health and Wellbeing 
Celebrating BSL Culture 
Transport 
Democratic Participation 
Page 203 of 238

Page 204

4
The Midlothian Council BSL Plan 2024-2030 sets out what we will do to support BSL
users in Midlothian. The plan covers access to information and services; children,
young people and families; training and work; health and wellbeing; culture and the
arts; transport; and democracy. 
Some of the key actions we will deliver include: 
 Providing information on key issues of importance to BSL users in BSL on the
Council website. 
 Supporting opportunities for teachers of the deaf and teachers working with
D/deaf and Deafblind children and young people to obtain qualifications up to
SCQF Level 10. 
 Signposting employer groups and partners delivering learning and employment
services to specific advice on the needs of BSL users. 
 Supporting the development of opportunities for D/deaf and Deafblind children,
young people, and their families, to learn about the heritage and culture of BSL. 
 Establishing a BSL User Group to engage more effectively with local BSL users. 
Page 204 of 238

Page 205

5
SECTION 5: Midlothian Council BSL Plan 2024-2030 
5.1: BSL Accessibility 
Our long-term goal:
To remove accessibility as a barrier for BSL users in all
aspects of life, recognising the importance of having
accessible information in the right format at the right time,
utilising technology and increasing people’s awareness of
communication tools. 
We will: 
1. Continue to promote the use of ContactScotlandBSL, the national BSL video
interpreting relay service, as a key method for contacting the Council. 
2. Provide training to staff on using ContactScotlandBSL.
3. Increase D/deaf and BSL awareness training for staff across all services.
4. Support identified public-facing staff to learn BSL. 
5. Translate material into BSL following requests from service users. 
6.  Provide information on key issues of importance to BSL users in BSL on the Council
website. 
Page 205 of 238

Page 206

6
5.2: Children, Young People and their
Families 
Our long-term goal:
We will ensure that D/deaf and Deafblind children have the
support they need at all stages of their learning and
development, so that they can reach their full potential. 
We will: 
7. Provide our early years and education staff with information about BSL and Deaf
culture, and resources available in BSL, so that they can meet the needs of families
with a D/deaf or Deafblind child.
8.  Ensure that all schools know how to access and use ContactScotlandBSL.
9. Ensure that fully qualified BSL interpreters are offered for school meetings and
events attended by parents or carers who use BSL. 
10. Use the ‘British Sign Language (BSL) Toolkit for Practitioners’ and other resources
developed by Education Scotland to help teachers engage more effectively with
parents and carers who use BSL. 
11. Signpost pupils and students to information, advice and guidance in BSL about their
career, learning choices and transition to training or employment.
12. Support opportunities for teachers and early years practitioners to learn BSL up to
the level of Scottish Credit and Qualifications Framework (SCQF) Level 6.
13. Investigate opportunities for teachers of the deaf and teachers working with D/deaf
and Deafblind children and young people to obtain further qualifications in BSL. 
14. Investigate opportunities for funding BSL tuition for families of D/deaf and Deafblind
children and young people. 
Page 206 of 238

Page 207

7
5.3: Access to Employment 
Our long-term goal:
BSL users will receive person-centred support to develop their
skills, consider what route to employment is right for them and
enter into the workforce so that they can fulfil their potential,
and improve Midlothian’s economic performance. They will be
provided with support to enable them to progress in their
chosen career. 
We will: 
15. Provide our employability staff and volunteers with information about BSL and Deaf
culture, and resources available in BSL, so that they can meet the needs of individual
BSL users and their family members.
16. Raise awareness of the UK Government’s ‘Access to Work’ (AtW) scheme with BSL
users and employers.
17. Signpost employer groups and partners delivering learning and employment
services to specific advice on the needs of BSL users.
18. Support BSL users to access volunteering opportunities with local organisations.  
Page 207 of 238

Page 208

8
5.4: Health and Wellbeing 
Our long-term goal:
BSL users will have access to the information and services
they need to live active, healthy lives, and to make informed
choices at every stage of their lives. 
We will: 
19. Signpost BSL users to health and social care information available in BSL.
20. Continue to ensure that any work we undertake locally to tackle social isolation
includes the needs of BSL users.
21. Increase the provision of information about sport and physical activity opportunities
for BSL users. 
5.5: Celebrating BSL Culture 
Our long-term goal:
BSL users will have full access to the cultural life of Midlothian,
and equal opportunities to enjoy and contribute to culture and
the arts, and are encouraged to share BSL and Deaf culture
with the people of Midlothian. 
We will: 
22. Help BSL users to take part in culture and the arts as participants, audience
members and professionals through the use of qualified BSL interpreters, volunteers
trained in BSL, and signed video.
23. Support the development of opportunities for D/deaf and Deafblind children, young
people, and their families, to learn about the heritage and culture of BSL.
Page 208 of 238

Page 209

9
5.6: Transport 
Our long-term goal:
BSL users will have safe, fair and inclusive access to public
transport and the systems that support transport use. 
We will: 
24. Support Transport Scotland initiatives to deliver practical solutions to make
travel more accessible for BSL users. 
5.7: Democratic Participation 
Our long-term goal:
BSL users will be fully involved in democratic and public life,
as voters, as elected politicians and as board members of our
public bodies. 
We will: 
25. Promote the Access to Elected Office Fund, which can meet the additional costs of
BSL users wishing to stand for selection or election in local or Scottish Parliament
elections.
26. Establish a BSL User Group to engage more effectively with local BSL users.  
Page 209 of 238

Page 210

10
SECTION 6: Monitoring and Reporting 
We will publish a progress update on the actions above in 2027, the midway point for
this plan. This will enable us to assess our performance and reflect on any work that
remains to be done to meet our long-term goals and overall vision for BSL users in the
Midlothian Council area. 
Midlothian Council will also contribute to the Scottish Government’s national BSL
progress report in 2026. 
Page 210 of 238

Page 211

For questions about this plan, please contact: 
Lesley Crozier, Equality and Diversity Officer
Email: lesley.crozier@midlothian.gov.uk 
Tel: 0131 271 3658
Address: Midlothian House, 40-46 Buccleuch Street, Dalkeith, EH22 1DN 
or 
Scott Williamson, Equality and Diversity Officer
Email: scott.williamson@midlothian.gov.uk  
Address: Midlothian House, 40-46 Buccleuch Street, Dalkeith, EH22 1DN 
BSL users can contact the Council via Contact Scotland BSL
Page 211 of 238

Page 212

Page 212 of 238

Page 213

Midlothian Council
Tuesday 7 May 2024
Item 8.8 
Capital Plan Prioritisation 
Report by Kevin Anderson, Executive Director - Place 
Report for Decision 
1 Recommendations 
Council is recommended to; 
a) Approve the inclusion in the General Services Capital Plan (i) the
extension of Bilston Primary; (ii) the extension of Mauricewood Primary,
both expected to be fully funded by developer contributions (so no
overall net borrowing cost to the Council); and (iii) expansion of
Hawthornden & Mount Esk to provide dedicated Additional Support
Needs (ASN) provision for Lasswade CHS and relocate Mount Esk ELC
provision to Hawthornden PS, expected to be fully funded by developer
contributions and early years funding (so no overall net borrowing cost
to Council); all as outlined in section 4.1(a) of this report 
b) Agree that the New Building Contract for Destination Hillend does not
proceed, with a revised replacement to reduce the footprint of the
building with a focus on facilities essential to the wider business case in
order to protect the level of revenue to be generated on site. Noting that
the extent of saving to be made is currently being reviewed by the
design team and will be presented to Council in the form of a revision to
the Business Case once this exercise is complete. 
c) decide on the appropriate forum for continued elected member
involvement in a cross party group for governance of the Capital Plan
and Infrastructure investment i.e. Business Transformation Steering
Group or a new Investment Strategy Group. 
2 Purpose of Report/Executive Summary 
Council approved at the meeting on 27 February, 2024 to adopt a longer term
strategic planning approach through the Strategic Infrastructure Investment
Framework for future capital investment and asset management. 
Council also agreed to establish a forum for continued elected member
involvement in a cross party group for governance of the Capital Plan and
Infrastructure investment. Members are required to decide if this will be
incorporated into the Business Transformation Steering Group or a separate
Investment Strategy Group.
Page 213 of 238

Page 214

2 
This report is to endorse that any increase in the GSCP debt must be
supported by clear, evidenced progress in bridging the gap between recurring
expenditure and recurring income. 
Date: 24 April 2024
Report Contact:
Name: Kevin Anderson, Executive Director – Place
Email: kevin.anderson@midlothian.gov.uk 
Page 214 of 238

Page 215

3 
3 Current Approved General Services Capital Plan (GSCP) 
3.1 The Capital Investment Strategy 2018 – 2028 agreed by the Council on 26
June 2018, comprised of investment over its 10 year period. Clearly it was
difficult to fully anticipate the local authority environment over such a long
period, so an element of the strategy represented aspiration and expectation
rather than certainty, particularly given the affordability gap for the projects
currently identified and costed.
3.2 The response to the Covid pandemic, EU exit and global conflicts are 
significant factors leading to an increase in construction inflation driven by
shortages also in the supply of materials and labour.
3.3 In this context the Council has seen tenders for projects returning prices
around 30% above what was expected when the plan was agreed and driven
by fast moving international events in this environment it has forced a rethink in
our investment plans. 
3.4 Recognising that in this environment it will not be possible to deliver the agreed
plan within the available resources a review to establish options to deliver the
Council’s priorities has been undertaken. It is proposed to focus the resources
we have on our priorities and critical building projects.
3.5 Elected members have been engaged through the Business Transformation
Steering Group (BTSG) and separate Group meetings  in a series of workshop
sessions to consider changes to the Capital Plan; to prioritise projects within
the available resources by deletions/pauses/deferrals of capital projects and
asset management, to achieve the approved Medium Term Financial Strategy.
3.6 The General Services Capital Plan approved by Council on 27/02/2024             
contains:- 
a) Total capital expenditure of £386.933m to 2027/28, and £458.331m including
Later Years 
b) Total capital funding of £116.094m to 2027/28, and £173.695m including Later
Years 
c) A total approved borrowing required per the 2024/25 Treasury Management
and Investment Strategy of £270.839m to 2027/28, and £284.635m including
Later Years 
Page 215 of 238

Page 216

4 
GENERAL SERVICES CAPITAL PLAN 2023/24 2024/25 2025/26 2026/27 2027/28 Total Ltr Yrs Total
2023/24 to 2027/28 F/cst O/turn Budget Budget Budget Budget Budget Budget Budget
£'000 £'000 £000's £000's £000's £'000 £000's £'000
EXPENDITURE - PER PROGRAMME BOARD
Children, Young People & Estates 28,266 40,862 82,647 79,450 35,156 266,381 6,470 272,851
Asset Management 14,188 17,118 9,990 9,470 10,423 61,187 7,108 68,295
Transport, Energy & Infrastructure 3,196 600 3,352 5,305 2,616 15,069 56,074 71,143
Regeneration & Development 12,992 13,705 9,513 1,386 0 37,596 3,367 40,963
Other 2,850 6,975 6,342 872 698 17,737 614 18,351
Provision for return of contingencies -506 -2,539 -2,019 -3,055 -2,918 -11,038 -2,234 -13,272
Total Approved Expenditure 60,985 76,721 109,824 93,428 45,974 386,933 71,398 458,331
Total Capital Funding 32,008 25,471 24,409 22,402 11,804 116,094 57,602 173,695
Approved Borrowing Required 28,978 51,250 85,415 71,026 34,170 270,839 13,797 284,635 
4 Loan Charges from GSCP Borrowing 
4.1 Loan Charges reflect borrowing costs to support the existing GSCP 
2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 Total
F/cst O/turn Budget Budget Budget Budget Budget Budget Budget
£'000 £'000 £000's £000's £000's £000's £000's £000's
Approved Borrowing Required (from table above) 28,978 51,250 85,415 71,026 34,170 270,839
Annual Loan Charges to Revenue Budget 1,700 5,460 10,173 12,520 12,889 13,700 14,616 
These loan charges figures include a refreshed Learning Estate Strategy in line
with recommendations made to Council on 27 February (subsequently
deferred).  Specifically, this reflects:- 
a) Inclusion of extension of Bilston & Mauricewood Primaries, and expansion of
Hawthornden & Mount Esk to provide dedicated Additional Support Needs 
(ASN) provision for Lasswade CHS and relocate Mount Esk ELC  provision to
Hawthornden PS, all approved in principle in GSCP and expected to be fully
funded by developer contributions (so no overall net borrowing cost to Council)
and (for the Bonnyrigg Primaries solution) early years funding. 
b) Inclusion of 2 stream primary school at development site Hs12 in Bonnyrigg:
Capital expenditure of £13.469m with all of the non-ASN costs of the school
funded by Developer Contributions of £11.691m; therefore potentially a net
borrowing cost to Council of £1.778m
.
Page 216 of 238

Page 217

5 
c) Inclusion of Backlog Upgrades to existing schools (King’s Park, Rosewell,
Mauricewood and Newtongrange Primaries) where the originally proposed
extension/refurbishment project is no longer proposed to progress: 
• Removal of Kings Park Primary School refurbishment / extension
• Removal of Rosewell Primary School refurbishment / extension
• Removal of Newtongrange Primary School refurbishment / extension
• Extension only for Mauricewood Primary School 
They do not include any borrowing associated with the Shawfair/ Dalkeith and
Newbattle/Gorebridge projects. These projects remain within the Learning
Estate Strategy with the nature and timing of provision being monitored to
inform required dates of delivery. 
5 Loan Charges and link to the Medium Term Financial Strategy 
5.1 The loan charges figures shown in the above table 4.1 contribute to a Budget
Gap for the existing term of the MTFS of £23.562m to 2028/29. These were the
loan charges reported to Council in the MTFS report on 27 February 2024. 
5.2 Any projects that are not fully funded by external capital grant income, or that
generate income that offsets the borrowing and operating costs in full, will
result in additional loan changes to the Council’s revenue budget 
5.3 Any further increase in loan charges above the levels shown in the above table
4.1 must be supported by clear, evidenced progress in bridging the revenue
budget gap between annually recurring income and expenditure in order to
reduce the expected gap of £23.562m to 2028/29. 
6 Capital Plan Prioritisation – Recommended changes 
6.1 Destination Hillend Project
It is recommended that the New Building Contract does not proceed, with a
revised replacement to reduce the footprint of the building with a focus on
facilities essential to the wider business case in order to protect the level of
revenue to be generated on site. The extent of saving to be made is currently
being reviewed by the design team and will be presented to Council in the form
of a revision to the Business Case once this exercise is complete. 
Page 217 of 238

Page 218

6 
6.2 Further work to the Shawfair All Through Education   Campus 
Following Council approval in December 2023, the Shawfair Town Centre Site
missives are now concluded, and the site acquired from Network Rail
Infrastructure Limited for education purposes. 
Edge Analytics are appointed to review all school pupil roll projections as they
have previously reviewed/advised Renfrewshire & West Lothian Council. The
output of this exercise will be used to inform the Dalkeith/Shawfair Education
Solution and is anticipated to be reported to Council by August 2024. 
In addition further action is in progress for: 
• Gorebridge 
• Roll projections continue to be monitored to establish timing of expansion
of school provision within this catchment, with
further work to be undertaken to identify sites within the Gorebridge area
that would be suitable for a Secondary School (preferably on land owned
by Council). 
• Newbattle 
• 300 pupil extension to existing Newbattle High School to be explored
within existing site capable of accommodating extension would increase
capacity from 1,400 to 1,700. 
7 Report Implications (Resource, Digital and Risk) 
7.1 Resource 
A review continues to reassess the use and conditions of Developer 
Contributions, with a status report to follow to Council. The application of       
developer contributions towards infrastructure provides funding towards new
facilities for our growing communities. Local communities and their elected
members are likely to be involved in considerations about facilities to be
delivered, in particular where there is an element about of direction about the
spending of contributions e.g. in relation to children’s play and community
facilities. 
The Council is the fastest growing local authority in Scotland and is currently
holding developer contributions totalling £49.5 million. Developer Contributions
are applied as negotiated. 
External legal advice to the Council in late 2023 confirmed that a Section 75
agreement is a contract between the parties i.e., if the agreement provides that
a contribution is to be repaid if not applied or legally committed within a
prescribed period, that is what the Council is obliged to do. 
Page 218 of 238

Page 219

7 
7.2       Digital 
There are no digital implications of this report at this point in time. 
7.3 Risk 
The risk is of emerging financial risks associated with the need to meet
identified affordability targets in the General Services Capital Plan. 
7.4 Ensuring Equalities (if required a separate IIA must be completed) 
An IIA is not required at this stage. 
7.5 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Background information/Links 
Page 219 of 238

Page 220

8 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Actively managing priorities within the GSCP will ensure that capital
investment required to ensure Midlothian Council’s priorities as set out in the
Single Midlothian Plan are achieved in a financially sustainable way.   
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The Capital Planning process aims to deliver Best Value as making the best              
use of public resources with clear plans and strategies in place, and with              
sound governance and strong leadership, the council will be well placed to              
ensure that all of its resources are deployed to achieve its strategic              
priorities, meet the needs of its communities and deliver continuous              
improvement. 
A.5 Involving Communities and Other Stakeholders 
Not applicable
A.6 Impact on Performance and Outcomes 
Not applicable 
Page 220 of 238

Page 221

9 
A.7 Adopting a Preventative Approach 
Utilising our assets base to efficiently deliver services to support our wider
transformation aims. 
A.8 Supporting Sustainable Development 
Not applicable 
Page 221 of 238

Page 222

Page 222 of 238

Page 223

Midlothian Council
Tuesday 07 May 2024
Item No 8.9 
Second Review of Scottish Parliamentary Boundaries 
Report by Dr Grace Vickers, Chief Executive 
Report for Decision 
1 Recommendation
The Council are invited to 
(a) note the revised proposed boundary reviews for the Midlothian
Scottish Parliamentary constituencies; and 
(b) determine whether to submit a formal comment/objection to
Boundaries Scotland. 
2 Purpose of Report/Executive Summary 
This report advises members of the terms of the second consultation
during the Second Review of Scottish Parliamentary Boundaries and
invites members to decide if the Council should make formal comment
or objection to the proposals for the new Midlothian South, Tweeddale
and Lauderdale and Midlothian North constituencies. 
Date:  23 April 2024
Report Contact: Alan Turpie, Legal and Governance Manager 
Email:  alan.turpie@midlothian.gov.uk 
Page 223 of 238

Page 224

2 
3 Background
3.1 There is a statutory requirement under Schedule 1 of Scotland Act 
1998 to review Scottish Parliamentary Boundaries on a regular basis.
Boundaries Scotland is an independent, non-political body which has
been set up and charged with carrying out reviews of Scottish
Parliamentary boundaries.
3.2 The first such review took place 2010/11 and established the
constituency boundaries used at the Scottish Parliamentary Elections
in 2011, 2016 and 2021. This consultation is part of the second review
which will report to the Scottish Ministers on 01 May 2025 and will set
the boundaries of constituencies and regions for the 2026 Scottish
Parliamentary Elections onwards. 
3.3 Members will recall that as part of the first consultation process
Boundaries Scotland proposed that Ward 3 Dalkeith will remain as part
of Midlothian North and Musselburgh along with wards from East
Lothian and Edinburgh whilst the other five wards would form a new
Midlothian South Constituency. 
Following the close of the first consultation process, Boundaries
Scotland held 6 public inquiries, including one in Musselburgh to
consider the proposed Midlothian North and Musselburgh constituency.
Following the inquiry, it is no longer proposed to proceed with the
Midlothian North and Musselburgh constituency but rather to form a
Midlothian North constituency and a Midlothian South, Tweeddale and
Lauderdale constituency. Details of the new proposed constituencies
are set out in Section 4 below. 
Boundaries Scotland have now opened a second consultation process
which will run from 16 April 2024 until 15 May 2024. Following the end
of the second consultation period, Boundaries Scotland will consider all
representations received and either confirm the proposed
constituencies or, if they consider further changes are required,
undertake a further one month consultation. It is not intended to hold
any further public inquiries. 
Page 224 of 238

Page 225

3
3.4 There are 73 Scottish Parliamentary constituencies and 8 regions and
these numbers are fixed in the Scotland Act, the review will not
therefore affect the number of MSPs (129).
Equally, the size of the three island constituencies are also fixed in
statute, the review looks only at the size of the 70 mainland
constituencies and seeks to reflect changing populations across
Scotland.
In reviewing constituencies, Boundaries Scotland are required to:
1. Take account of Council area boundaries
2. Create constituencies that have broadly the same number of
electors
3. Take account of special geographical considerations
4. Take account of local ties and other inconveniences caused by
changes to constituencies 
Boundaries Scotland have calculated the Electoral Quota for this
review (the population of the constituencies under review divided by
70) as 59,902 and the electorate of each constituency must be as near
as the electoral quota as is practical having regard to rule 1 (taking
account of Council area boundaries).
3.5 The proposals under this second consultation will have the following
effect across Scotland:
• 22 Constituencies completely unchanged;
• 3 constituencies renamed but boundaries unchanged;
• 18 constituencies where boundaries have been changed but name
unchanged – including Midlothian South, Tweeddale and
Lauderdale;
• 30 constituencies where boundaries and names have both been
changed – including Midlothian North.  
4 Midlothian Constituencies
4.1 In terms of the current Scottish Parliamentary Boundaries, Midlothian is
split into two cross boundary constituencies – Midlothian North and
Musselburgh and Midlothian South, Tweeddale and Lauderdale. 
Currently Ward 2 Bonnyrigg, Ward 3 Dalkeith, part of Ward 4
Midlothian West and Ward 5 Midlothian East are in Midlothian North
and Musselburgh along with two East Lothian wards whilst Ward 1
Penicuik, the remaining part of Ward 4 Midlothian West and Ward 6
Midlothian South are in Midlothian South Tweeddale and Lauderdale
along with some Scottish Borders wards. 
The current electorate figures for the current boundaries are as follows: 
Midlothian North and Musselburgh – 69,302 
Midlothian South, Tweeddale and Lauderdale – 65,410 
Page 225 of 238

Page 226

4
4.2 In terms of the amended consultation proposals, Ward 2 Bonnyrigg,
Ward 3 Dalkeith, Ward 5 Midlothian East and parts of Ward 4
Midlothian West and Ward 6 Midlothian South will form a new
Midlothian North constituency whilst the remaining parts of Ward 4
Midlothian West and Ward 6 Midlothian South together with Ward 1
Penicuik will be joined with parts of Scottish Borders to form Midlothian
South, Tweeddale and Lauderdale constituency. 
The boundaries of the new Midlothian North and Midlothian South,
Tweeddale and Lauderdale constituencies are shown in Appendices B
and C respectively. 
The electorate figures for the proposed boundaries are as follows: 
Midlothian North – 53,996 
Midlothian South – 60,183 
It must be noted that these figures are within the proposed parameters
of other constituencies. 
5. Report Implications (Resource, Digital and Risk)
5.1 Resource
There are no resource implications arising directly from this report.
5.2 Digital 
There are no digital implications related to this report.
5.3 Risk
There are no risk implications arising from this report.
5.4 Ensuring Equalities 
An equalities impact assessment has not been required in connection
with this report.
5.5 Additional Report Implications 
See Appendix A 
Page 226 of 238

Page 227

5
Appendix A - Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
There are no direct implications related to this report. 
A.5 Involving Communities and Other Stakeholders 
The report does not directly relate to involving communities. 
A.6 Impact on Performance and Outcomes   
Not applicable 
A.7 Adopting a Preventative Approach 
Not applicable 
A.8 Supporting a Sustainable Development 
Not applicable
Page 227 of 238

Page 228

Page 228 of 238

Page 229

Page 229 of 238

Page 230

Page 230 of 238

Page 231

Page 231 of 238

Page 232

Page 232 of 238

Page 233

Midlothian Council
Tuesday, 7 May 2024
Item 8.10 
Use of Glyphosate in Weed Control 
Report by Derek Oliver, Chief Officer, Place 
1 Recommendations 
Council is recommended to note the targeted application and continued
managed usage of glyphosate in weed control across Midlothian. 
2 Purpose of Report/Executive Summary 
In March 2021, Council approved the use of glyphosate on a restricted
spot application basis, on Midlothian’s streets and pavements; agreed
the continued reduction in usage in Midlothian’s parks and open
Spaces, with the exception of invasive species, e.g. giant hogweed and
Japanese knotweed and dangerous road junctions and areas of
highways that are key to maintaining visibility for the safety of all road
users, e.g. laybys and the inside of bends; and agreed information on
spraying locations be published as soon as possible. 
The purpose of this report is to update Council on the managed and
controlled use of glyphosate since March 2021. 
Date:    16 April 2024
Report Contact:  Derek Oliver, Chief Officer - Place
Email:  derek.oliver@midlothian.gov.uk 
Page 233 of 238

Page 234

2
3 Background 
3.1 On 25th June 2019, Midlothian Council determined that glyphosate would
be prohibited from use on Council owned land, with the exception of
invasive species. This followed an initial moratorium on glyphosate use
agreed by Council in May 2019 due to concerns for the environmental
impact on bees. 
3.2 On 5th May 2020, there was cross party agreement to permit the use of
glyphosate on an emergency basis during the pandemic. 
3.3 On 18th February 2021, a cross party meeting was held to discuss the use
of glyphosate and the practical alternatives as due to the restrictions on
workforce and working practices during the pandemic, significantly less
quantities of glyphosate were used in 2020 compared to previous years. 
3.4 On 23rd March 2021, Council approved the use of glyphosate on a
restricted spot application basis, on Midlothian’s streets and
pavements; agreed the continued reduction in usage in Midlothian’s
parks and open Spaces, with the exception of invasive species, e.g.
giant hogweed and Japanese knotweed and dangerous road junctions
and areas of highways that are key to maintaining visibility for the
safety of all road users, e.g. laybys and the inside of bends; and agreed
information on spraying locations be published as soon as possible. 
4 Main Report 
4.1 Since March 2021, the managed use of glyphosate by Neighbourhood
Services (specifically Land & Countryside Services) delivered a
significant reduction in volume of glyphosate used to control weeds,
aligned to the spot treatment application process and Council approved
direction. 
4.2 Table 4.5.1. below illustrates the trend of glyphosate usage and
corresponds to the narrative in section 3.  Contractor usage volumes
from 2015-2019 are included (circa 898 litres per annum 2015-2018,
449 litres in 2019, as per prohibition as detailed in section 3.1). 
Application of weed killer has all been undertaken internally since 2020. 
4.3 On 6th September 2023, cross party agreement was sought for an
increased use of glyphosate that would impact the demonstrable
downward trend of usage since the 2020 Council approved position. 
The reason was that 2021 and 2022 had dry summer periods where
application and volume was able to be restricted. However, in 2023, a
much wetter summer period was experienced, providing optimum
conditions for extensive weed growth.  By September, Land &
Countryside Services had spot treated all identified areas once and
three quarters of Midlothian a second time. At that time, 600 litres had
been applied, with the west of the county requiring to be spot treated
for a second time.  It was estimated that 80-100 additional litres would
be required.  Blanket application would require 450 litres, by
comparison. 
Page 234 of 238

Page 235

3
4.4 This agreed additional volume therefore resulted in a slight increase in
volume by comparison to 2022, which, although higher than the
previous two years, is significantly less than prior to the change in
working practices from blanket to spot treatment. 
4.5 Cost comparison for the additional spot treatment to undertaking a
delayed weed control programme in Autumn 2023, when grass cutting
concluded, in order to free up personnel to utilise plant on urban streets
alone (not including rural areas), was calculated to be £69,000 in staff
time.  This was utilising four ride on sweepers from Waste Services,
impacting Waste operations, over an 18 week period.  This calculation
was based on previous internal trials.  This compared to a cost of
£15,201 to undertake the final 80-100 litres spot treatment outlined
above.   
Table 4.5.1. 
4.6 Neighbourhood Services continues its commitment to minimise use of
glyphosate, so far as is reasonably practicable, and as detailed on our
website: Glyphosate weed killer | Midlothian Council.  The Service
will continue to explore alternative methods to further reduce volume of
glyphosate. 
4.7 There can be extenuating circumstances where there will be a
managed increase in use on the previous year, such as outlined in
relation to optimum weed growth weather conditions in 2023.
Furthermore, the service has taken on the maintenance of three
additional housing sites for the 2024 season.  These sites will require
weed control and therefore glyphosate use.  As such, a target for 2024
of 680 litres would represent a comparative reduction in glyphosate
use, taking into account additional adopted areas (footways,
carriageways, verges and shrub beds).  This presents an annual
challenge to the service with the development across Midlothian. 
4.8 The service is also responsible for the delivery of private grounds
maintenance contracts where chemical use is required as part of the
agreed specification. As part of the Council’s commitment to reduce
Year
Volume of
Glyphosate
(Litres)
2015 2398
2016 1238
2017 1823
2018 1843
2019 1374
2020 450 
2021 650
2022 605
2023  680
Page 235 of 238

Page 236

4
glyphosate use, we encourage our private clients to reduce the amount
of chemicals used as part of the contract, where possible. 
4.8 As part of the ongoing Neighbourhood Services review, the Land and
Countryside service and the Street Cleaning service have merged to
create a Neighbourhood Environment Team which now forms part of
the new Greenspace Service. 
4.9 The design and implementation of the Neighbourhood Environment
Team is expected to result in improvements to service delivery, which
will raise the quality of the local environment in a number of ways,
including the way the service controls weeds. 
4.10 The Neighbourhood Environment Team will therefore be responsible
for weed control as follows; 
• Neighbourhood Operatives will carry out hand removal of weeds
while carrying out street cleaning duties where practical,
reducing the need for glyphosate
• A targeted winter work programme will see a deep clean of key
routes targeting the removal of detritus at wall bases and around
obstacles such as traffic islands
• Improvements to the way mechanical sweepers are deployed
will see a reduction in detritus which will result in a reduction in
weed growth
• A removal of poor quality shrub beds, to be replaced by grassed
areas with native trees planted, will increase biodiversity and
reduce the need for glyphosate use to control weeds within the
beds.  Thirteen shrub beds have been identified for removal in
2024. 
4.11 The Greenspace Service will continue to build on the partnership with
community based volunteer groups to jointly tackle weed growth across
Midlothian without the use of glyphosate, where practical. The service
has agreed to cease or reduced by consequence glyphosate use
where community groups have adopted specific locations in the
following areas:  
• Bonnyrigg
• Newtongrange
• Woodburn
• Roslin  
• Danderhall
• Dalkeith
• Gorebridge 
4.12 The spraying programme is detailed on the website, as approved by
Council in 2021. 
Page 236 of 238

Page 237

5
5 Report Implications (Resource, Digital and Risk) 
5.1 Resource 
Delivery of current weed control processes is contained within existing
budget allocation to Neighbourhood Services.  Any reduction in the use
of glyphosate will require additional financial allocation to manage
weed control, dependent upon the proposed and agreed methods to
undertake this function.  
5.2 Risk 
Within current service resources, the standard of weed control across
Midlothian will deteriorate without the use of glyphosate, presenting a
risk to residents and infrastructure as well as the reputation and image
of the authority. 
6 Ensuring Equalities (if required a separate IIA must be completed) 
Less ambulant residents can be impacted by poor weed control,
specifically in relation to slips, trips and falls. 
Appendices 
Appendix A – Report implication 
Page 237 of 238

Page 238

6
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan
This report does not impact on the key priorities of the Single
Midlothian Plan. 
A.2 Key Drivers for Change
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
Current methods of weed control represents best value. 
A.5 Involving Communities and Other Stakeholders
There is ongoing engagement with community groups and residents
with regards to weed control.   
A.6 Impact on Performance and Outcomes
The report directly impacts on Midlothian Council’s performance and
outcomes. 
A.7 Adopting a Preventative Approach
The report highlights the preventative approach to detrimental impact
on infrastructure and the management of slip, trips and falls hazards
that would otherwise result in claims costs for the Council.  
A.8 Supporting Sustainable Development
Weeds need to be removed to prevent damage to infrastructure and
control risks associated with slips, trips and falls.  Removal of shrub
beds will reduce the use of glyphosate and encourage biodiversity with
grass and native tree substitution.
Page 238 of 238