Democracy Spraffa

Agenda Document Pack - Midlothian Council - 01/04/2025

Midlothian Council · 1 April 2025
Back to Midlothian Council — 1 April 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Notice of Meeting and Agenda 
Midlothian Council 
Venue:  Council Chambers/Hybrid, 
Midlothian House, Dalkeith, EH22 1DN 
Date:  Tuesday, 01 April 2025 
Time:  11:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone: 
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.Midlothian.gov.uk 
Page 1 of 222

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item and
the nature of their interest. 
4          Deputations 
No items for discussion 
5          Minutes
5.1 Minute of the Council meeting of 25 February 2025 4 - 27
5.2 Minute Volume Index 28 - 29
5.3 Action Log 30 - 38 
6          Questions to the Council Leader 
No items for discussion 
7          Motions
7.1 Feasibility Study for Bridge Infrastructure 39 - 39 
8          Public Reports
8.1 Lasswade High School Childcare Service Consultation – Executive
Director Children, Young People and Partnerships
40 - 45
8.2 Intake Figures and Reserved Places for Primary and Secondary
Schools Session 2025/2026 – Executive Director Children, Young
People and Partnerships
46 - 82
8.3 Midlothian School Uniform and Clothing Policy – Executive Director
Children, Young People and Partnerships
83 - 90
8.4 Mobile Phone Use in Midlothian Secondary Schools – Executive
Director Children, Young People and Partnerships
91 - 95
Page 2 of 222

Page 3

8.5 Midlothian Local Development Plan 2017 – Delivery Programme –
Chief Officer Place
96 - 216
8.6 CCTV Phase 1 Upgrade – Chief Officer Place 217 - 222 
Exclusion of Members of the Public
(A) TO CONSIDER RESOLVING TO DEAL WITH THE UNDERNOTED
BUSINESS IN PRIVATE IN TERMS OF PARAGRAPH 9 OF PART 1 OF
SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT 1973 -
THE RELEVANT REPORTS ARE THEREFORE NOT FOR PUBLICATION;
AND
(B) TO NOTE THAT NOTWITHSTANDING ANY SUCH RESOLUTION,
INFORMATION MAY STILL REQUIRE TO BE RELEASED UNDER THE
FREEDOM OF INFORMATION (SCOTLAND) ACT 2002 OR THE
ENVIRONMENTAL INFORMATION REGULATIONS 2004. 
9          Private Reports
9.1 Police Scotland & Midlothian Council Funding Model 2025/2026
and Antisocial Behaviour – Executive Director Place 
9.2 Waverley District Heat Network – Consultation – Executive Director
Place 
9.3 Incident Management – Building Standards – Chief Officer Place 
9.4 Sporting Event 2027 – Executive Director Place 
10    Date of Next Meeting 
The next meeting will be held on Tuesday 13 May 2025 
Page 3 of 222

Page 4

Minute of Meeting 
Midlothian Council
Tuesday 1 April 2025
Item No 5.1 
Midlothian Council 
Date Time Venue
Tuesday 25 February 2025 11:00 am Council Chambers, Midlothian
House/Hybrid 
Present:
Provost McCall (Chair) Deputy Provost Bowen (Deputy Chair)
Councillor Parry (Council Leader) Councillor Cassidy (Deputy Council Leader)
Councillor Alexander (virtual) Councillor Curran
Councillor Drummond Councillor Imrie
Councillor McEwan Councillor McKenzie
Councillor McManus Councillor Milligan
Councillor Pottinger (virtual) Councillor Russell
Councillor Scott Councillor Smaill
Councillor Virgo Councillor Winchester 
Religious Representatives:
Anne-Theresa Lawrie 
In attendance:
Dr Grace Vickers, Chief Executive Kevin Anderson, Executive Director Place
Fiona Robertson, Executive Director
Children, Young People and
Partnerships
Morag Barrow, Director of Health and Social
Care: Midlothian Health and Social Care
Partnership, Chief Officer to Midlothian
Integrated Joint Board
Page 4 of 222

Page 5

Fiona Clandillon, Head of
Development
Nick Clater, Head of Adult Services, Chief
Social Worker
David Gladwin, Chief Financial
Officer / Section 95 Officer Saty Kaur, Chief Officer Corporate Solutions
Derek Oliver, Chief Officer Place Alan Turpie, Legal and Governance
Manager/Monitoring Officer
Magnis Inglis, Principal Officer,
Workforce, Policy, and Pupil
Placements
Gary Thomson, Senior Finance Business
Partner
Gillian Cousins, Communities
Officer 
Hannah Forbes, Democratic Services
Officer
Louise Middleton, Democratic
Services Officer
Maria Perez, Democratic Services Officer 
Janet Ritchie, Democratic Services
Officer Nicola Thorburn, Democratic Service Officer 
1.   Welcome, Introductions and Apologies
The Chair, Provost McCall, welcomed everyone to the meeting. The Chair
advised that the meeting was open to the public and would be webcast live. 
There were no apologies submitted. 
The Chair passed on the sad news that Mary Stalker, who was Penicuik’s First
Citizen of the Year, died last month. Mary Stalker was well known for her
successful campaign in keeping Ladywood Leisure Centre open, was an
employee of Midlothian Council and a Home Help for over 20 years. 
The Chair congratulated Midlothian Council’s Ageing Well Coordinator, Vivian
Wallace, who was awarded a Member of the Most Excellent Order of the British
Empire (MBE) in the King’s New Year’s honours list. 
The Chair congratulated Lorna Greig of Roslyn who was awarded an MBE for
her work with the Brownies in Loanhead, where she has been involved for 50
years. 
The Chair congratulated William Lumsden of Dalkeith who was awarded an MBE
for his service to the Scottish whisky industry. 
The Chair thanked Donald Cameron, one of Midlothian Council’s Environmental
Health Officers, who will be retiring in March with 40 years’ service to the Council. 
2.  Order of Business 
The order of business is as per the agenda. 
Page 5 of 222

Page 6

3.  Declarations of interest  
Councillor Milligan declared an interest in Item 9.5 on the Private Agenda
and said that he will leave the meeting at that point. 
4.  Deputations 
No deputations. 
5.  Minutes of Previous Meetings 
Item No. Report Title Submitted by:
5.1 Minute of Midlothian Council
Meeting of 17 December 2024 Executive Director Place
Outline and Summary of Discussion 
The Minute of the Meeting of Midlothian Council held on the 17 December 2024 was
submitted for approval.
Councillor Smaill raised concerns regarding the response from the Member of
Parliament (MP) in relation to the £20m commitment to Mayfield, made by the Prime
Minister in 2024. Councillor Smaill  asked the Council Leader to respond to the letter
to ensure a review of the entitlement of Mayfield to £20m. The Council Leader
confirmed they have met and written to the MP for Midlothian and agreed to continue
to search for funding that could be committed for Mayfield and Midlothian. The
Council Leader agreed to write to the MP again to encourage them to contact
Westminster regarding funding for Mayfield.   
Elected Members raised an item from the action log, the surveys for Education were
to be presented to the Business Transformation Steering Group (BTSG) and Elected
Members have yet to have sight of these. Elected Members stated that they are
being asked to support a capital spend in an area unsupported with all the
information required to make a decision. The Executive Director Place confirmed
building condition surveys for Primary Schools, Secondary Schools and the non-
education estate have been completed. The Executive Director Place advised that
the principle in terms of the education estate is to move those properties in category
C to category B and this is reflected in the Capital Plan paper on the agenda later
today. In relation to capital spend work, this is still being analysed and can be
provided, and the costings are within the Capital Plan paper today. The Executive
Director Place confirmed that all spreadsheets will be shared with Elected Members. 
Councillor Parry moved to approve the Minute of the Meeting of Midlothian Council
of 12 November 2024, seconded by Councillor Virgo. 
Decision
The Council approved minute of the meeting of 12 November 2024.  
Page 6 of 222

Page 7

Action
Share all relevant spreadsheets, surveys and information in relation to the Capital
Plan with Elected Members – Executive Director Place
Council Leader to write to MP about the funding for Mayfield – Councillor Parry 
Item No. Report Title Submitted by:
5.3 Minute Volume Index Executive Director Place 
Outline and Summary of Discussion
The Minute Volume Index was submitted for approval.
The Minute Volume Index was moved by Councillor Parry and seconded by
Councillor Virgo.
Decision
Council approved the Minute Volume Index. 
Item No. Report Title Submitted by:
5.4 Action Log Executive Director Place 
Outline and Summary of Discussion
The Action Log was submitted for noting.
Elected Members highlighted action number 12 and asked for an update on the
search for a site to accommodate Gorebridge High School. The Executive Director
Place advised this remained a work in progress. A suitable site was originally being
sought within the Gorebridge cluster area, but this had now been expanded to
Gorebridge in totality. A further update would be presented by the end of June.
Elected Members emphasised the need to identify a site as there was currently a
lack of High School capacity, and this situation would only get worse. Elected
Members also highlighted the need to keep the community updated on the progress
of work and asked for an update to be brought back to June Council and the
Executive Director agreed. 
Elected Members thanked the Chief Executive for the work on action number 17
which related to exploring options for polling places and ensuring sufficient disability
access at polling stations. 
Decision
Council noted the Action Log.
Action
Page 7 of 222

Page 8

The Executive Director Place will provide an update on identifying a site for
Gorebridge High School by the end of June. 
6.  Questions to the Leader of the Council 
None. 
7.  Motions 
Item No. Report Title Submitted by:
7.1 Labour Group Representatives on
Committees and Working Groups Councillor Imrie
Outline and Summary of Discussion
Councillor Imrie moved an addendum that Councillor Drummond would like to
withdraw from the Dean Tavern Trust and will be replaced by Councillor Bowen
subject to agreement. 
The Legal and Governance Manager/Monitoring Officer advised that a vote for a
replacement member would be required. The replacement was agreed by 14
Elected Members. 
The notice of motion was moved by Councillor Imrie and seconded by Councillor
Milligan.
Decision
Council approved the motion. 
Item No. Report Title Submitted by:
7.2 Response to Storm Eowyn Councillor Parry 
Outline and Summary of Discussion
The notice of motion was proposed by Councillor Parry and seconded by Councillor
Milligan.
Councillor Parry explained this motion was to acknowledge the exceptional
response by Midlothian Council staff and emergency service partners following
Storm Eowyn on 24 January 2025 where wind speeds of up to 119mph were
recorded at Hillend. Staff provided essential services, responding to fallen trees and
power cuts, and continued to deliver services to Midlothian Council’s most
vulnerable residents.  Councillor Parry also thanks the staff working behind the
scenes to deploy resources and ensure residents were kept informed with up-to-
date communications. 
Page 8 of 222

Page 9

Elected Members agreed staff carried out a great job and that this was an
opportunity to get feedback on joint working and information sharing and look at any
learning opportunities Midlothian Council could gain. 
The motion was moved by Councillor Parry and seconded by Councillor Milligan. 
Decision
Council approved the motion. 
8.  Reports 
Report No. Report Title Submitted by:
8.1 Financial Monitoring 2024/25 –
General Fund Revenue
Chief Financial Officer &
Section 95 Officer
Outline and Summary of Discussion 
The Chief Financial Officer/Section 95 Officer presented the report for noting.
The purpose of this report is to provide Council with information on projections of
performance against service revenue budgets in 2024/25 and to provide
commentary on areas of material variance against budget. The budget performance
figures as shown in appendix 1 result in a projected net overspend of £2.168 million
which is a slight improvement of £0.032 million from projections at quarter 2. The
projected overspend represents 0.7% of the revised budget.  
Some areas of projected overspend relate to recurring areas of financial pressure
or slower than planned delivery of savings measures. The Corporate Management
Team have discussed these in depth and, where possible, put in place recovery
actions. 
The projection of the General Fund balance at 31st March 2025 is £20.965 million,
of which £13.126 million is earmarked for specific use leaving a non-earmarked
General Fund balance of £7.839 million. 
Decision
Council noted the report and its recommendations. 
Report No. Report Title Submitted by:
8.2 Housing Revenue Account Revenue
Budget 2024/25 – 2025/26 and Capital
Plan 2024/25 – 2027/28
Chief Financial Officer &
Section 95 Officer
Outline and Summary of Discussion 
The Chief Financial Officer/Section 95 Officer presented the report for noting and
approval.
Page 9 of 222

Page 10

The purpose of the report is to provide Council with a summary of expenditure and
income to the end of quarter 3 in 2024/25 for the Capital Plan and a projected outturn
for both the Revenue Account and Capital Plan for 2024/25 and Capital Plan and
Revenue budgets for 2025/26 and indicative budget.
The projected financial performance for 2024/25 is:
• Capital Investment in the year totalling £47.459 million;
• A net overspend of £0.049 million on the Revenue Account;
• A projected HRA general reserve at 31st March 2025 of £35.094 million. 
The HRA Capital Plan 2025/26 – 2027/28 provides for:
• £108.605 million for Phases 3-5 of New Build Social Housing;
• £19.5 million for Housing-led Town Centre Regeneration;
• £41.145 million for investment in Energy Efficiency Standards in Social
Housing; and £27.134 million for other investment in existing stock and off-
market purchases. 
The Revenue Budget Reflects:
• An update of the multi-year financial model prepared in line with the Social
Housing Investment Plan (SHIP);
• A 4.8% rent increase as approved at Council 21st February 2023;
• A projected HRA Reserve of £35.094 million at 31st March 2025, which will
be required to finance the majority of approved investment commitment and
is projected to reduce to £1.880 million at 31st March 2040. 
Council is recommended to:
• Approve the Housing Revenue Account (HRA) Capital Plan for 2025/26
(appendix D); 
• Approve the HRA Revenue Budget for 2025/26 (appendix E);
• Note the indicative HRA Revenue and Capital Budgets for 2026/27 and
2027/28 as detailed in appendices D and E; and otherwise
• Note the remaining contents of this report. 
Elected Members noted the strong stability from the last report whilst noting the
rising number of applicants on the housing waiting list. 
Elected Members advised that they had visited a new build property and were
concerned around the specifications of new homes. Elected Members noted that
there was little storage space provided, and attic hatches had been locked, with the
reason stated that this was due to the insulation. Elected Members were concerned
this suggested a lack of trust in tenants to use spaces appropriately and would like
a paper on these issues for a future Council meeting. 
Elected Members also raised concern about the installation of air source heat pumps
and requested a report showing comparison costs of utility bills when using gas,
electricity or heat pumps and a true analysis on the impact on tenants who may be
worried about rising costs. 
Page 10 of 222

Page 11

Elected Members queried the number of Housing Officers in comparison to housing
stock levels. Elected Members felt an increase in staff within the Housing Service
would better serve staff and tenants and asked that a report be brought to Council
on Housing Service staffing.
The Executive Director Place noted all points raised and will prepare the reports
requested.
Elected Members raised concern about the projected numbers, whilst Midlothian
Council is growing in stock the amount allocated to administration and management
is flat for the period 2027/28. There is concern that general repairs will fall back this
year and Elected Members asked if a sensitivity analysis should be carried out to
look at adverse trends and if they eat into projections.
The Chief Financial Officer/ Section 95 Officer clarified the administration and
management costs are direct staffing costs that can appropriately be charged to the
revenue account. The slight increase is due to inflation in staffing costs. 
The report was moved by Councillor McKenzie and seconded by Councillor Curran. 
Decision
Council approved the report and its recommendations.
Action
Prepare a paper for Council detailing the reasons why attic hatches are locked in
new build Council properties – Executive Director Place
Prepare a report regarding the installation of air source heat pumps, showing
comparison costs of utility bills when using gas, electricity. - Executive Director
Place.
Add in the Housing Officers staffing level report and also to the Action Log please 
Report No. Report Title Submitted by:
8.3 General Services Capital Plan
2024/25 Quarter 3 Monitoring and
2025/26 to 2028/29 Budgets
Chief Financial
Officer/Section 95 Officer 
Outline and Summary of Discussion 
The Chief Financial Officer/Section 95 Officer presented the report for approval. 
The purpose of the report is to provide Council with:- 
• An update of the GSCP incorporating information on further additions to the
Capital Plan for approval 
• Information on the projected performance against budget for 2024/25 
Page 11 of 222

Page 12

• Forecast expenditure and income for the GSCP for 2025/26 through to
2028/29 
• Update on the Capital Fund 
It is recommended that Council:
a) Note the inclusion of the projects listed in Section 3.1 in the General Services
Capital Plan (GSCP);
b) Approve the addition of the new projects to the GSCP, as outlined in Section 3.2;
c) Note the forecast outturn for 2024/25 for expenditure, funding and borrowing as
outlined in Section 4;
d) Note the planned expenditure and funding levels in the GSCP for
2024/25 to 2028/29 (as outlined in Section 5 and shown in Appendices 1 and 2),
prior to reaching a financially sustainable outcome from the Capital Plan
Prioritisation exercise. 
Elected Members agreed to move the recommendations and welcomed the building
of a primary school and modular unit for Roslin Primary School. 
Elected Members highlighted the need for clearer communication with the public on
the plan for Midlothian House as soon as possible. Elected Members also reiterated
the need to have full sight of the Capital Plan to assist in the decision-making
process in terms of more critical projects. 
The report was moved by Councillor Parry and seconded by Councillor Virgo.
Decision
Council approved the report and its recommendations. 
Report No. Report Title Submitted by:
8.4 Treasury Management and
Investment Strategy 2025/26 &
Prudential Indicators
Chief Financial
Officer/Section 95 Officer 
Outline and Summary of Discussion 
The Chief Financial Officer/Section 95 Officer presented the report for approval. 
This report was taken to Audit Committee on 24 February 2025 and the main
discussion points were:
• Support for relaxation of the current strategy for cash back reserves:
• Concerns over growing economic uncertainty in borrowing costs:
• Concern over extent of borrowing required.
• Concern over the impact of cash back reserves on availability of cash in an
emergency situation. 
After discussion the Audit Committee were content to support the report as
presented. 
Page 12 of 222

Page 13

The Chief Financial Officer/Section 95 Officer explained that the 2024/25 strategy
was approved by Council on 27 February 2024 and an update was presented to
Council on 17 December 2024. Today’s report contains one material change to the
existing strategy which is to move from fully cash back Council reserves to a position
of greater borrowing to allow deferral of longer term borrowing to a time where
interest rates are forecast to reduce. 
Elected Members are also asked to increase the authorised limit to external debt of
£605m, reflecting borrowing requirements to the end of financial year 2025/26.
Section 3 of the report provides an update on the position from 2024/25 which is in
line with the report from December 2025. The Council’s borrowing requirement,
based on existing capital plans, sits at £433m to the end of financial year 2028/29.
In order to provide flexibility and borrowing at the best rates available previous
strategies provided an authorised limit for external debt for the current, and next 4
financial years and Council approved a recommended change to that practice for
2023/ 24 and 2024/25 given current challenges. The Chief Financial Officer/Section
95 Officer recommends continuing with that whilst Council works through financial
strategies. 
Section 5 covers prudential indicators to demonstrate the Council’s Capital Plans
are affordable and sustainable. Section 6 cover the repayment of loan fund
advances.
It is recommended that Council: a) Approve the restriction of the Authorised Limit to
the value of the Capital Financing Requirement at 31 March 2026 (£604.957 million),
pending finalisation of the General Services Capital Plan Prioritisation;
b) Note that there are no other material changes proposed to the Treasury
Management and Investment Strategy (TMIS) for 2025/26 from the strategy
currently in place, other than:-
i. to no longer fully cash back the Council’s useable reserves – instead, to run down
cash balances to support the deferral of borrowing as outlined in Section 4, to allow
the Council to navigate past the current interest rate hump; and
ii. to update the Prudential Indicators (Section 5 and Appendix 2), to reflect the
revised capital plans; 
c) Note the use of the Asset Life method for the repayment of all loans fund
advances as outlined in Section 6; and 
d) Accordingly approve the Treasury Management and Investment Strategy for
2025/26.
Elected Members approved the recommendations and highlighted that the treasury
management performance of Midlothian Council has been fantastic and
congratulated the team who continue to work hard for excellent results. 
Elected Members queried if Midlothian Council were going to consider the
Environment, Social and Governance (ESG) aspect at some point. The Chief
Financial Officer/Section 95 Officer explained the ESG impact was quite complex in
terms of understanding how individual banks use the money Midlothian Council puts
Page 13 of 222

Page 14

out on deposit. Midlothian Council relies on the assessment from external ethical
advisors, and while the Chief Financial Officer/Section 95 Officer agreed some
evolution on ESG needed to happen, they were content with assessment from
external guidance. 
Elected Members reiterated again the need for information and sight of the Capital
Plan. The Executive Director Place confirmed information has been shared with
Elected Members including dashboards, workstreams and dilapidation surveys and
they will issue further information to Elected Members as soon as possible.
The report was moved by Councillor Parry and seconded by Councillor McEwan. 
Decision
Council approved the report and its recommendations. 
Report No. Report Title Submitted by:
8.5 Scottish Local Authorities
Remuneration Committee -
Recommendations
Chief Officer, Corporate
Solutions
Outline and Summary of Discussion 
The Chief Officer, Corporate Solutions presented the report for decision. 
The purpose of the report is to update on the outcome of the Scottish Local
Authorities Remuneration Committee review and the regulations that will be laid
down by Scottish Government from 1 April 2025. 
It is recommended that Council: 
• Note that Scottish Government propose to set down regulations in relation to
pay and banding changes to take effect from 1 April 2025
• To note that as of 1 April 2025, Midlothian will move from a Band A Council
(for the purposes of Councillor Remuneration) to a Band B Council
• To determine if Council should appoint an additional two Senior Councillors
from 1 April 2025 (as per paragraph 3.7).
• To determine if the payments to the Civic Head and Senior Councillors remain
as per the existing % relative to the Council Leader salary (as per paragraphs
3.9 and 3.10). 
The Chief Officer, Corporate Solutions noted an error in the last recommendation
and noted the Civic Head is set in regulations and is not determined by Council. 
Councillor Parry moved the report with the amendment that Senior Councillors
remain at 8 and pay is set at 75% of the Council Leader’s salary, seconded by
Councillor Milligan.
Page 14 of 222

Page 15

Decision
Council approved the report and its recommendations. 
Report No. Report Title Submitted by:
8.6 Fees and Charges Chief Officer, Corporate
Solutions
Outline and Summary of Discussion 
The Chief Officer, Corporate Solutions presented the report for decision. 
The purpose of the report is to provide Council with the proposed fees and charges
table for 2025/26 for consideration and approval.
It is recommended that Council:
• Agree to the implementation of the new, revised and frozen charges as
outlined within the report (and the associated policy changes for new and
revised charges) from 1 April 2025; and
• Note the final agreed fees and charges register will be published on the
Council’s website. 
The Chief Officer Corporate Solutions noted a change in section 3.33 and Elected
Members were asked to note that the individual learning accounts from Skills
Development Scotland no longer exist, but reassured Elected Members there are
concessionary rates for those on benefits, including pensioners and help is provided
for those who cannot afford to pay in lump sums by paying in instalments and if
people meet the No One Left Behind criteria, courses can be funded through that. 
Councillor Parry moved the recommendations, and this was seconded by Councillor
Virgo. 
Decision
Council approved the report and its recommendations. 
Report No. Report Title Submitted by:
8.7 Medium Term Financial Strategy Chief Financial
Officer/Section 95 Officer
Outline and Summary of Discussion 
The Chief Financial Officer/Section 95 Officer presented the report for decision.
The purpose of the report is to provide Council with the budget position for 2025/26
to allow discharge of their statutory duties to set a balanced budget for 2025/26. The
report also provides budget projections for financial years 2026/27 through to
2028/29 and planning assumptions for future Council Tax increases.
Council is recommended to:
Page 15 of 222

Page 16

a) Note the key messages in the Accounts Commission Local Government
Financial Bulletin 2023/24
b) Note the position relating to Scottish Government funding for Councils in
2025/26 and the associated grant settlement for Midlothian Council.
c) Approve a 5% uplift in Foster Care Fees for 2025/26 and agree the principle
of an automatic annual uplift in line with pay inflation 
d) Approve an allocation to Midlothian Integration Joint Board (MIJB) for
2025/26 of £71.086 million in respect of delegated services (subject to final
confirmation of the distribution of Scottish Government Funding) 
e) Approve the 2025/26 base budget as shown in table 6, sections 3.30–3.35
and detailed in appendix C.
f) Approve prioritisation of Transformation Blueprint work as outlined in section
3.40.
g) Approve savings as outlined in sections 3.42 to 3.44
h) Approve a 10% increase in Council Tax rates for 2025/26 (sections 3.46-
3.47). Council Tax bandings are shown at appendix B.
i) Approve indicative Council Tax increases of 9% in 2026/27, 8% in 2027/28
and 5% in 2028/29 (sections 3.46-3.47).
j) Approve the utilisation of £4.093 million of earmarked General Fund Reserve
to balance the 2025/26 budget (section 3.48)
k) Approve that any additional funding provided by the government to support
Council financial pressures will be used to displace the use of General Reserves
which can subsequently be earmarked to support transformation work (section 3.49)
l) Note that the projected budget gap over the life of the Medium-Term Financial
Strategy (MTFS) through to 2028/29, assuming Council support all
recommendations in this paper, is £8.891 million
m) Note that a further MTFS report with updated financial projections with a
specific focus on progress with Transformation Blueprint work and the General
Services Capital Plan will be presented to Council on 24th June 2025.
n) Otherwise, note the remainder of the report.   
Elected Members agreed the Council’s financial challenge remains, but it has been
vastly reduced with more money from Scottish Government for public services. It
was noted that Midlothian Council is the fastest growing Council in Scotland and as
such the Council will have higher costs for this financial year and next. Elected
Members confirmed the rate for Council Tax in Midlothian Council will rise by 10%
in the next financial year and residents will expect the Council to prioritise views on
this basis. Residents who took part in consultations told Midlothian Council they
wanted to retain leisure centres and for community resources to remain open.
Residents also wanted investment in roads and green spaces, so Midlothian Council
have increased the budget for these in the next financial year. Residents requested
investment in Health & Social Care and, whilst Midlothian Council’s allocation to the
Integrated Joint Board remains high, this will still need careful monitoring as there
remains a funding gap. Midlothian Council have also invested in uplifting foster care
allowance for the second year in a row. 
Elected Members considered it important to note the combined % of National
Insurance increase and net costs, increased budget to Adult Social Care, increased
budget to roads and landscape amount to 9.5% just for those ring-fenced budgets.
Residents will be paying more but Midlothian Council are delivering more however
Page 16 of 222

Page 17

the Council are spending more than received and this will mean further efficiencies
and methods to generate income may be required. Consideration will be given to
commercial services, for example if there are low numbers at leisure centres,
consideration may be given to reducing opening hours. Elected Members noted the
public interest and petitions to save leisure centres and swimming points and
emphasised that Midlothian Council are of the same principle and encouraged
members of the public to use the facilities available to them. 
Elected Members also highlighted the cooperation between Group Leaders and
Trade Unions within Midlothian Council and were grateful for the collegiate nature. 
Councillor Parry moved the recommendations in advance of an anticipated
amendment relating to the saving proposal for Lets and Charges for After School
Clubs and added an additional recommendation to incorporate the anticipated costs
from that, and from the previous paper to be drawn from reserves. 
Elected Members agreed the financial position is difficult, the Scottish Government
settlement reduced the budget deficit, and this was further reduced by some other
costs including yield from packaging tax. However, a number of additionalities were
introduced and the floor payment, as fastest growing authority in Scotland, still
required Midlothian Council to hand back the equivalent of 3% or £1.9m to provide
stability. It was also noted that whilst the Integrated Joint Board funding is very
generous there remains a risk of not covering underspend fully. 
Elected Members referenced item 3.40, the Transformation Blueprint Work on
Income Generation. Elected Members requested that all the income generation
ideas that were brought forward as savings proposals are rolled into a
Transformation Programme and, as a Council, we recognise the importance of
looking into these ideas of the Council making more money rather than cutting
services, introducing services to bring in more income to help mitigate the imbalance
between the 22% rise in Council Tax over the last 10 years versus the 54% rise in
inflation. Elected Members asked that all income generation is pulled together into
a programme and the Council identify appropriate resourcing to realise, in its initial
stage, business cases for each of those plans to bring forward to Council to
determine whether Council go ahead with those or not so that when it comes to next
year budget decision Elected Members have that information to hand.
Councillor Virgo requested an amendment to 3.43, Lets and Charges for After
School Clubs. Whilst understanding the reasons behind this Elected Members
considered it critical to highlight that the 35% variance move from 85% subsidy to
50% subsidy is a 300% increase in rents for providers of after school clubs and this
could be catastrophic for some providers. Councillor Virgo asked if this could be
phased to allow for prudent planning and communication and recommended 10%
this year, with expectation of further movement in further years, with engagement
with providers and noting the impact this change will have on the sustainability of
providers. Councillor Virgo confirmed 10% this year with the variance in MTFS
covered from reserves at this time. 
The Chief Financial Officer/Section 95 Officer clarified that the savings proposal was
£171k, the recommendation reduces that to £41k so adding £131k to the budget
Page 17 of 222

Page 18

which is to be funded from reserves. 
The Legal and Governance Manager/Monitoring Officer confirmed the Leader of the
Council accepted the changes to the motion.
Elected Members suggested writing to the Scottish and Westminster Government
asking for additionality noting that even with 10% increase in Council Tax the
Integrated Joint Board still has a £2.5m budget gap. Councillor McManus confirmed
he has written to the Cabinet Secretary to highlight the difficulties faced with the
Integrated Joint Board and that they would circulate that letter to Elected Members
Councillor Parry moved the recommendations, and this was seconded by Councillor
Virgo. 
Decision
Council approved the report and its recommendations.
Action
Circulate letter to Group Leaders that was sent to the Cabinet Secretary to highlight
the difficulties faced with the Integrated Joint Board to Elected Members – Councillor
McManus
Council Leader to write to UK and Scottish Governments about the pressure
increased National Insurance employer contributions are having on the budget and
Integrated Joint Board pressures – Councillor Parry 
Report No. Report Title Submitted by:
8.8 Audit Committee Recruitment of an
Independent Member
Chief Internal Auditor
Outline and Summary of Discussion 
The Chief Officer Corporate Solutions presented the report for decision, highlighting
that it had been approved at Audit Committee on 24 February 2025 with no changes. 
Council is recommended to: 
• Approve the change to the Scheme of Administration for the Audit Committee
to recruit for 2 Independent Committee Members. 
• Approve the change to the Scheme of Administration for the Audit Committee
members to appoint a permanent Committee Chair from within all Audit
Committee members. 
• Approve the permanent move to specifying the Audit Committee meeting
schedule of 4 meetings a year, whilst still allowing additional meetings to be
scheduled. 
Page 18 of 222

Page 19

• Approve the introduction of a payment of a fee of £200 per Committee
attended for each Audit Committee up to a maximum of £1,000 per annum
for Independent Audit Committee members. 
The Chair thanked the Chief Officer Corporate Solutions for the report and opened
for questions. 
Councillor McEwan moved the report and thanked the Audit Committee and Officers
for their work.  The report was seconded by Councillor Smaill. 
The Legal and Governance Manager/Monitoring Officer advised that two of the
recommendations involve a change to the Scheme of Administration, which forms
part of the Standing Orders.  Standing Order 3.2 notes that 10 Elected Members
must approve the amendment and therefore asked Council for a show of hands in
favour of the change. 
Decision
17 Elected Members voted in favour of the amendment to the Scheme of
Administration and Council approved the report and its recommendations. 
Report No. Report Title Submitted by:
8.9 Standing Orders Working Group
update and schedule of meeting
dates 2025/2027
Chief Officer Corporate
Solutions 
Outline and Summary of Discussion 
The Chief Officer Corporate Solutions presented the report for decision, which
includes updates to the Standing Orders, the proposed meeting schedule for the
next two academic years and the agreed process for the recording of private items
of meetings of Council and its Committees. 
Council is recommended to:
• Approve the updates to the Standing Orders which includes changes to
reflect the proposed process for recording private items (subject to approval
of the next recommendation below).
• Approve the process for recording of private items as set out in paragraph
3.4 and 3.5 and in doing so agree that the Standing Orders and Scheme of
Administration are updated.
• Approve the schedule of meetings dates for 2025/26 and 2026/27.
The Chair thanked the Chief Officer Corporate Solutions for the report and opened
for questions. 
The report was moved by Councillor Smaill and seconded by Councillor Virgo.
Elected Members asked about the General Data Protection Regulation (GDPR)
implications of recording private items on MS Teams.  The Legal and Governance
Page 19 of 222

Page 20

Manager/Monitoring Officer advised that GDPR is only applicable where personal
information is involved and should only be retained as long as necessary.
Elected Members asked if there were any barriers in keeping the recordings
indefinitely, and if this would align with the Council’s data retention policy.  The Legal
and Governance Manager/Monitoring Officer advised that once the minute is
approved at the next meeting, the minute becomes the official record of the meeting. 
After that point the recording would no longer be required and should be deleted in
line with the retention schedule.  
Elected Members requested that the retention period for the recording is amended
to 12 months.  The Legal and Governance Manager/Monitoring Officer and Chief
Officer Corporate Solutions advised that if that is what the Council deem necessary
then there are no issues in retaining the recording for 12 months. 
The Legal and Governance Manager/Monitoring Officer advised that Standing Order
3.2 notes that 10 Elected Members must approve the amendment and therefore
asked Council for a show of hands in favour of the change.  
Decision
16 Elected Members voted in favour of the amendment to the retention period and
Council approved the report and its recommendations.   
Report No. Report Title Submitted by:
8.10 UK Shared Prosperity Transition
Funding 2025/26
Executive Director -
Children, Young People
and Partnerships
Outline and Summary of Discussion 
The Executive Director Children, Young People and Partnerships presented the
report for decision, which seeks Council’s agreement to approve the continuation of
delegated authority to Executive Directors to allocate funding to projects for UK 
Shared Prosperity’s transition year of funding 2025/26. 
Council is recommended to:
• Delegate authority to the Executive Director Place and Executive Director
Children, Young People and Partnerships in their role as Chair of the UK
Shared Prosperity Fund Board to allocate UK Shared Prosperity transition
funding 2025/26 in line with funding conditions.
• Agree that an update on the UK Shared Prosperity transition funding 2025/26
will be brought back to Council at a future date.
• Note outcomes of the UK Shared Prosperity Fund 2022-25 programme.
The Chair thanked the Executive Director Children, Young People and Partnerships
for the report and opened for questions.  No questions were submitted. 
Page 20 of 222

Page 21

The report was moved by Councillor Parry, and they asked that Directors implement
this decision swifty to avoid any further delays and impact to the third sector.  The
report was seconded by Councillor Cassidy.
Decision
Council approved the report and its recommendations and amendment. 
Report No. Report Title Submitted by:
8.11 Use of Glyphosate Update Report Chief Officer Place 
Outline and Summary of Discussion 
The Chief Officer Place presented the report for decision, requesting permission
from Council for the Recycling and Greenspace service to apply glyphosate to
control weeds from the beginning of March 2025. 
Council is recommended to approve an expansion of the time period with which
glyphosate can be applied, in order to improve the visual appearance of the local
environment in the public realm across Midlothian.
The Chair thanked the Chief Officer Place for the report and opened for questions.   
Elected Members noted their disappointment, and concerns from the public, at
having to use glyphosate again this year but also appreciate that it is necessary to
keep Midlothian beautiful.  Elected Members are satisfied that the way the
Environmental Team use the glyphosate is direct and not on food sources. It is
hoped that there will be a reduction next year following the great work of the
Greenspace and Environmental Team.  
The report was moved by Councillor Alexander and seconded by Councillor
Cassidy.
Decision
Council approved the report and its recommendations. 
Report No. Report Title Submitted by:
8.12 Standards Commission Decision Legal and Governance
Manager/Monitoring
Officer
Outline and Summary of Discussion 
The Legal and Governance Manager/Monitoring Officer presented the report for
decision, advising that in terms of Section 18 of the Ethical Standards in Public Life
etc. (Scotland) Act 2000 and Rule 10.9 of the Standards Commission Hearing Rules,
the Council requires to consider, within three months, the terms of a written decision
issued by the Standards Commission for Scotland. 
Page 21 of 222

Page 22

Council is recommended to consider the decision of the Standards Commission in
relation to complaint reference LA/Mi/4131.  
The guidance issued by the Standards Commission on 26 September 2024 confirms
that all Elected Members can participate in this discussion regardless of their
involvement in the hearing. Elected Members have no right to appeal against this
decision but can comment should they wish.
The Chair thanked the Legal and Governance Manager/Monitoring Officer for the
report and opened for questions. 
While unrelated to this hearing, Councillor Parry expressed their disappointment in
the process regarding Standards complaints.  The timescales to reach a hearing are
too long and do not benefit any of those involved.  
Councillor Parry’s stated that their personal view is that the Standards Commission
have a weak record of not taking concerns or complaints in relation to sexual
harassment seriously, either during the process or in their findings and outcomes.   
The Standard Commission often does not demonstrate the principles of its own code
and are not fit for purpose.  These points have also been raised at the Convention
of Scottish Local Authorities (COSLA).  Councillor Parry intends to write to the
Standards Commission and invite them to meet with her to explain and discuss how
they can make both process and outcomes better.  If Group Leaders or other Elected
Members would like to attend, Councillor Parry would welcome them to that meeting.  
Councillor Parry closed by adding that the Elected Members in the Chamber are
good people, and that is disappointing when they are all tarnished with bad publicity.
Decision
Council decided to note the report and its recommendations. 
The public part of the meeting ended at 13:42. 
9. Private 
Exclusion of Members of the Public 
In view of the nature of the business to be transacted, the Committee agreed
that the public be excluded from the meeting during discussion of the
undernoted item, as contained in the Addendum hereto, as there might be
disclosed exempt information as defined in paragraphs 6,8 and 9 of Part I of
Schedule 7A to the Local Government (Scotland) Act 1973:-
Page 22 of 222

Page 23

Midlothian Council
Midlothian House
Buccleuch Street
Dalkeith Council Leader
EH22 1DJ Councillor Kelly Parry
Midlothian
Thursday 13 March 2025
The Right Honourable Rachel Reeves
Chancellor of the Exchequer
House of Commons
London
SW1A 0AA
Issued by post and email:
rachel.reeves.mp@parliament.uk
public.enquiries@hmtreasury.gov.uk
Dear Chancellor,
Midlothian Council – budget and National Insurance increases
I write on behalf of Midlothian Council to express our thanks for the additional
funding allocated to Scotland in the recent UK Budget. This much-needed
investment will undoubtedly support essential public services and help us address
key local priorities for our residents. Your recognition of Scotland’s needs is very
much welcomed.  
However, while this additional funding is positive, we must acknowledge the
impact of the increase in National Insurance contributions. This has, in turn, led to
rising costs for councils, contributing to an increase in Council Tax for our
residents at a time when many are already facing financial pressures. Local
government is doing everything possible to mitigate these challenges, but we are
concerned about the strain this places on households and our local economy,
third sector organisations, commissioned services and businesses.
In light of this, I urge the UK Government to consider reversing the National
Insurance increase as soon as financial headroom becomes available. A reversal
would provide significant relief to both councils and the communities we serve,
allowing us to maintain essential services without placing an undue burden on
residents.  
Once again, thank you for your continued support for Scotland. I look forward to
your response.  
Page 23 of 222

Page 24

Tel 0131 271 3002   
Our Ref:   www.midlothian.gov.uk 
Yours sincerely, 
Yours sincerely
Councillor Kelly Parry 
Leader of Midlothian Council 
Kelly.Parry@midlothian.gov.uk 
Page 24 of 222

Page 25

Midlothian Council  
Midlothian House
Buccleuch Street
Dalkeith Council Leader
EH22 1DJ Councillor Kelly Parry   
Tel 0131 271 3002   
Our Ref:   www.midlothian.gov.uk 
Midlothian 
Thursday 13 March 2025 
Kirsty McNeill MP
Member of Parliament  
House of Commons  
London  
SW1A 0AA   
By email:
kirsty.mcneill.mp@parliament.uk 
Dear Kirsty McNeill 
Request for the Honouring of Funding Pledges Made During the Election 
I am writing following the recent meeting of Midlothian Council, where frustrations
were again expressed regarding the £20 million commitment pledged by the
Prime Minister, Rishi Sunak, during the General Election for Mayfield, Midlothian. 
As you will be aware, this pledge has not yet been honoured, and
understandably, this remains a significant concern for the Council and our local
communities.
Council has asked me to formally raise this matter with you to seek clarity on the
status of this commitment and to explore any possible solutions. In order to avoid
the need for repeated correspondence on this issue, I wonder if it might be helpful
to arrange a meeting with Midlothian East’s ward Councillors and the Mayfield
and Easthouses Community Council. This would provide an opportunity for open
discussion and a constructive way forward.
I would be grateful if you could advise on your availability for such a meeting at
your earliest convenience. I look forward to your response and appreciate your
attention to this important matter. 
Yours sincerely,
Yours sincerely
Councillor Kelly Parry
Leader of Midlothian Council
Kelly.Parry@midlothian.gov.uk
Page 25 of 222

Page 26

Midlothian Council  
Midlothian House
Buccleuch Street
Dalkeith Council Leader
EH22 1DJ Councillor Kelly Parry 
Midlothian 
Thursday 13 March 2025 
Shona Robison MSP
Cabinet Secretary for Finance and Local Government
The Scottish Government 
By email:
dfmcsf@gov.scot 
Dear Cabinet Secretary, 
Midlothian Council funding 
I write on behalf of Midlothian Council to express my sincere thanks for the
increase in funding allocated to our council in the recent Scottish Budget. 
This additional resource has been invaluable in sustaining essential services,
delivering for our communities, and allowing us to progress vital projects,
including the construction of new schools. Your support has provided much-
needed stability at a challenging time for local government. 
However, I must also highlight the ongoing financial pressures within Health and
Social Care. Our commitment to providing a generous allocation to the Integration
Joint Board (IJB) reflects the critical nature of these services, but it has
contributed to a significant funding gap within our overall budget. Combined with
the impact of rising National Insurance contributions, this has unfortunately led to
an increase in Council Tax for our residents—something we had hoped to avoid. 
We remain committed to working constructively with the Scottish Government to
address these financial challenges, ensuring we continue to deliver the best
possible services for our communities. 
I would welcome the opportunity to engage in further discussions on how we can
collaborate to mitigate the pressures on local government, particularly in the area
of Health and Social Care funding. 
Once again, thank you for your ongoing support and commitment to local
services. I look forward to continuing our dialogue on these important matters. 
Page 26 of 222

Page 27

Tel 0131 271 3002   
Our Ref:   www.midlothian.gov.uk 
Yours sincerely,
Yours sincerely
Councillor Kelly Parry
Leader of Midlothian Council
Kelly.Parry@midlothian.gov.uk 
Page 27 of 222

Page 28

Midlothian Council Minute Volume
Presented to the Meeting
of Midlothian Council
on Tuesday, 01 April 2025
Midlothian Council
Tuesday 1 April 2025
Item No 5.2
Page 28 of 222

Page 29

1   Minutes of Meetings submitted for Approval
No items for discussion
2   Minutes of Meetings submitted for Consideration
Approved Minutes for Noting, Information and Consideration of any
recommendations contained therein
Minute of Cabinet Meeting 5 November 2024 3 - 13
Minute of Audit Committee Meeting 25 November 2024 14 - 24
Minute of General Purposes Committee Meeting 4 February 2025 25 - 37 
3   Minutes of Meetings submitted for Information
Minute of the Midlothian Integration Joint Board Audit and Risk
Committee 5 December 2024
38 - 42
Minute of Midlothian Integration Joint Board Meeting 19 December
2024
43 - 57
Page 29 of 222

Page 30

Midlothian Council
Tuesday 1 April 2025 
Item No 5.3     
Midlothian Council Action Log 
No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments
1 21/02/2023 Capital Plan Prioritisation Refer approved Council report
to BTSG on additional
affordability scope and projects.
Executive
Director Place
a) December
2024 
Recommend for
closure – revised Capital
Plan report approved at
Council on 25 Feb 2025 
2 19/12/2023 8.4 Non-Domestic Rates Relief
Policy
Review of policy to be
undertaken in 6 months – 1
year.
Chief Officer
Corporate
Solutions
No later than
April 2025
Report to Council to be
submitted with income
achieved as part of Q4
financial monitoring
3 26/03/2024 8.4 Midlothian Council Mixed
Tenure Strategy
Arrange an Elected Member
briefing on arm’s length
organisations (ALEOs)
Executive
Director Place
Oak Leaf homes
option (MMR &
Market Rent)
included in MTFS
2025/26
proposals 
Currently scoping option
for special purpose
vehicle in development
and management &
maintenance of Mid-
Market Rent
Page 30 of 222

Page 31

No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments 
4 25/06/2024 8.14 Whitecraig Traveller Site A full cost report to come back
to Council for final approval to
include early termination cost
and reinstatement cost unless
the cost for this is nil.
Executive
Director Place
When termination
costs are known
Align to any action jointly
with ELC
5 27/08/2024 8.1 Financial Monitoring 2024/25
General Fund Revenue
Report on the better utilisation
of expensive machinery, such a
used for potholes. 
Chief Officer
Place
ASAP Currently under review
with the additional MTFS
road repairs allocation.
6 27/08/2024 8.3 General Services Capital
Plan 2024/25 Quarter 1
Monitoring
Provide a final account for
clarity to the Elected Members
on Hillend Alpine Coaster
project costings
Chief Financial
Officer
GSCP Q3
Financial
Monitoring report
to Council in
February.
Coaster operational.
Final account being
concluded and will be
reported to members in
General Services Capital
Plan Q4.
7 27/08/2024 8.3 General Services Capital
Plan 2024/25 Quarter 1
Monitoring
Report to be presented to
Council on a site for Gorebridge
High School within six months. 
Executive
Director Place
End Feb 2025 Site search in progress –
Verbal update at
February Council and
further update to Council
by June 2025.
8 08/10/2024 8.1 Medium Term Financial
Strategy
Heads of Service to look for
additional efficiency savings to
bridge the budget gap of .3.4
million on top of the savings
already suggested in the public
budget consultation. This is to
Chief Financial
Officer
Proposals to be
presented in
November BTSG
Recommend for
closure - Medium Term
Financial Strategy
approved at Council on
25 Feb 2025. 
Page 31 of 222

Page 32

No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments
be reviewed at November
council meeting. 
9  12/10/2024 8.2 Housing Revenue Account –
Revenue Budget and Capital
Plan 2024/25  
To provide details of the multi-
year HRA financial model to
Elected Members. 
Chief Financial  
Officer
Alongside the next
iteration of the
Rents Strategy.
Current rent strategy final
year is 2025/26. A
consultation Rent
Strategy report will be
submitted to Council by
October 2025. 
10  17/12/2024  5.4 Action Log Letter from the UK Government
to be added to the minute of
February 2025 Council.
Democratic
Services 
Recommend for closure
-Letter included in the
agenda pack of 25 Feb
2025 
11  17/12/2024 7.1 Inclusion of Local Youth and
School Parliaments in Council
Meetings
Consider next steps after motion
was approved at December 2024
Council meeting.
Standing Orders
Working
Group/Alan
Turpie & Saty
Kaur 
Recommended for
closure - discussed at
SOWG and on the SOWG
Action Log. 
12  17/12/2024 7.2 Requirement for approval
and additionality of Planning
Obligations associated with
increasing major developments
Referred to Chief Officer Place
and Chief Planning Officer to
action after motion was approved
with amendment at December
2024 Council meeting. 
Chief Officer
Place & Chief
Planning Officer 
Planning Obligations and
Developer Contributions
scoped into the MLDP2
review and current
workshop process with
elected members. 
13  17/12/2024 8.6 Review of Scheme of Polling
Districts and Polling Places
2024
Revisit the use of the Penicuik
Centre as a Polling Station and
ensure there is sufficient
Chief Executive  Recommend for closure
– There is a lift available
at the Penicuik Centre
Page 32 of 222

Page 33

No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments
disability access. and no disability access
issues have been raised
regarding previous polling
scheme
iterations. However, if
members would prefer, a
solution has been
identified to move the
polling stations
at the Penicuik Centre
from
the first floor to the ground
floor. This would require
the library to close on
polling day to
accommodate this
change. 
14 17/12/2024 8.9 Twinning Midlothian Updated Midlothian Council
website to include a dedicated
page which lets communities
know what Twinning activities are
taking place. 
Chief Officer
Corporate
Solutions
2025 In progress. 
15 17/12/2024 8.13 Animal Boarding
Establishment Licence
Conduct a review on commercial
dog walkers, including a review
Chief Officer
Place
2025 In progress
Page 33 of 222

Page 34

No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments
Conditions  of any existing policy. 
16  17/12/2024  8.15 Capital Plan Prioritisation -
Progress Report  
Arrange a briefing on the Capital
Plan for Elected Members, prior
to the report being published to
Council.
Executive
Director Place
18 February  Recommended for
closure - Capital Plan
briefing held on 18
February 2025 before
February Council
meeting. 
17  17/12/2024 Private discussion regarding
private item (Item 9.1) of Minute
of Council Meeting of 12
November 2024   
A paper to be brought back to
February Council on the
recording of private agenda
items. 
Legal and
Governance
Manager/Monitor
ing Officer 
Recommend for closure
Process agreed at Feb
Council and implemented 
18 25/02/2025 Minute of Midlothian Council
Meeting of 17 December 2024
(Item 5.1) 
Share relevant building condition
spreadsheets/ surveys and
information in relation to the
Capital Plan with Elected
Members. 
Council Leader to write   to the
MP on the matter of the funding
pledges made ahead of the
General Election for Mayfield 
Executive
Director Place 
Council Leader
ASAP 
ASAP
Recommend for closure
Information circulated on
25 February. 
Recommend for
closure- letter appended
to the minute of the Feb
meeting 
19 25/02/2025 Housing Revenue Account Prepare a paper for Council Executive  June 2025 
Page 34 of 222

Page 35

No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments
Revenue Budget 2024/25 –
2025/26 and Capital Plan
2024/25 – 2027/28 (Item 8.2) 
detailing the reasons why attic
hatches are locked in new build
Council properties – Executive
Director Place. 
Director Place 
20 25/02/2025 Housing Revenue Account
Revenue Budget 2024/25 –
2025/26 and Capital Plan
2024/25 – 2027/28 (Item 8.2) 
Prepare a report regarding the
installation of air source heat
pumps, showing comparison
costs of utility bills when using
gas, electricity. - Executive
Director Place. 
Executive
Director Place 
June 2025 
Page 35 of 222

Page 36

No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments
21 25/02/2025 Medium Term Financial
Strategy (Item 8.7) 
Circulate letter that was sent to
the Cabinet Secretary to highlight
the difficulties faced with the
Integrated Joint Board to Elected
Members – Councillor McManus 
Council Leader to write to UK
and Scottish Governments about 
the pressure increased National
Insurance employer contributions
are having on the budget and
Integrated Joint Board pressures
Councillor
McManus 
Councillor Parry
1st April 2025 
ASAP
Recommend for closure-
Letter circulated 
Recommend for closure-
Both letters appended to
the minute of the Feb
meeting
22 25/02/2025 Proposed Disposal of Property
Asset
The Chief Officer Place to
provide the exact number of
single units in a block of four.
Chief Officer
Place 
1 April 2025 In progress
23 25/02/2025  Capital Plan Prioritisation The Executive Director, Place
would provide the details of
developer. contributions that
have no expiry date at St.
David’s Primary School 
The Executive
Director Place
1 April 2025 Recommend for closure -
Circulated to members
14/03/2025
24 25/02/2025  Capital Plan Prioritisation The Executive Director, Place
would provide the respective
timescales for the extension
The Executive
Director Place
1 April 2025 Mauricewood Primary
School refurbishment and
expansion result was
Page 36 of 222

Page 37

No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments
and refurbishment of
Mauricewood Primary School.
referenced in the Capital
Plan Prioritisation report to
Midlothian Council meeting
on 25 February 2025.
A project is being
developed to extend
Mauricewood Primary
School. The works would
include additional
classrooms and a Games
hall. This is subject to
Council approval.
Building Condition Surveys
completed in 2024 for
Learning Estate and also
Non- Education buildings.
There are concerns
regarding the affordability
of incorporating these
costs into the General
Services Capital Plan as
they stand, particularly due
to the variability of impact
from year to year and the
loan charges that this
would give rise to.
Therefore packages of
works across the asset
portfolio be identified for
Page 37 of 222

Page 38

No Date of meeting Item No and Title Action Action Owner Expected
completion date
Comments
prioritisation, to smooth
these impacts out and
enhance its affordability as
well as addressing
Midlothian Council
buildings conditions.    
A report will then be
brought back to Council
following the conclusion of
this work to seek approval
for the incorporation of the
prioritised works into the
General Services Capital
Plan. 
Page 38 of 222

Page 39

Midlothian Council
Tuesday 1 April 2025
Item No 7.1
Midlothian Council
1 April 2025
Notice of Motion
Feasibility Study for Bridge Infrastructure
Council notes that Midlothian is the largest growing Council in Scotland and has a
growing demand for infrastructure in Midlothian due to this population growth and
enable economic development. 
Council also notes, some employment opportunities are concentrated in the West
of Midlothian, while the East experiences higher levels of deprivation.  
Council also notes that the geography of Midlothian presents significant challenges
for east-to-west connectivity and that the lack of sufficient transport infrastructure
and road network between the east and west of Midlothian hinders economic
growth, access to services, and social mobility.  
Therefore, Council believes that improved transport links are essential to
supporting economic equality and sustainable development across Midlothian and
furthermore, believes that a bridge, or a multiple bridge network, could provide a
vital connection between the east and west of the region, improving accessibility
for residents, businesses, and public services. The Council notes 
that a feasibility study is necessary to explore the potential benefits, costs, and
environmental impact of such infrastructure.  
Council resolves to write to the Scottish Government, urging them to provide
funding and commence a feasibility study into the construction of a bridge, or
bridges, to enhance connectivity between the East and West of Midlothian, and to
engage with relevant stakeholders, including Transport Scotland, local businesses,
and community groups, to support and inform this proposal.  
Proposed:  Councillor Kelly Parry
Seconded:  Councillor Russell Imrie
Page 39 of 222

Page 40

Midlothian Council
Tuesday 01 April 2025
Item No 8.1 
Lasswade High School Childcare Service Consultation 
Report by Executive Director Children, Young People & Partnerships 
Report for Decision 
1 Recommendations
Council is recommended to approve the following: 
i. The closure of Lasswade High School Childcare Service from
September 2025. 
2 Purpose of Report
This report advises on the outcome of the statutory consultation on the
proposal to close Lasswade High School Childcare Service and seeks
approval for the recommendation outlined above. 
The statutory consultation on the proposal was undertaken in the
period from Friday 29 November 2024 to Friday 24 January 2025. The
statutory report on the outcome of the consultation was published on
10 March 2025 and provides full details of the process undertaken,
representations made and Education Scotland’s report on the proposal. 
Date:  10 March 2025
Report Contact: 
Craig Murrin, Business Support Officer, Education   
Craig.Murrin@midlothian.gov.uk 
Page 40 of 222

Page 41

3 Background 
1. The Education (Scotland) Act 1980 places a legislative duty on the
Council to make adequate and efficient provision of school education
across its area. This duty applies in respect of both the current school
population and anticipated pattern of demand. 
2. Section 3D of the Standards in Scotland’s Schools etc. Act 2000 (as
inserted by Section 2 of the Education (Scotland) 2016 Act) introduces
a requirement on education authorities to carry out their duty to ensure
the delivery of improvement in the quality of school education which is
provided in the schools they manage, with a view to achieving the
strategic priorities of the National Improvement Framework. It is,
therefore, the duty of the education authority to ensure that the
education it provides is directed to the development of the personality,
talents and the mental and physical abilities of the children to their
fullest potential. 
3. In addition, Councils have a statutory duty to secure best value in terms
of the Local Government in Scotland Act 2003 by continuous
improvement in performance of the local authority’s functions, while
maintaining an appropriate balance between quality and cost and
having regard to economy, efficiency, effectiveness, equal
opportunities and the achievement of sustainable development. 
4. At a meeting of Midlothian Council on 25 June 2024, approval was
granted for officers to undertake a statutory consultation on the
proposal to close Lasswade High School Childcare Service and for a
report on the outcome of the consultation exercises to be brought back
to council for consideration and a decision. 
5. Lasswade High School Childcare Service is located within the
Lasswade High School Centre in Bonnyrigg. The Childcare service is
registered with the Care Inspectorate to provide a service to a
maximum of 15 children aged 0 to those not yet attending primary
school. As of November 2024, there were 10 children attending the
setting. 
6. A review of the service was undertaken by setting management in late
2013 and this was then changed to a childcare setting operating full
time places as a funded provider. This change did not require a
statutory consultation as the legislative duty to consult on establishing
new nurseries and nursery classes was suspended at the time to
facilitate the move from 475 to 600 hours of funded early learning and
childcare. 
7. The childcare service is staffed appropriately as per the Care
Inspectorate's regulation for child staff ratios in group based ELC
settings. They are supported by the Depute Head Teacher (DHT) of
Lasswade High School and in terms of quality an Early Years Principal
Teacher (PT). 
Page 41 of 222

Page 42

8. The childcare setting comprises of a main playroom with small kitchen
area, children's nappy changing and toilet. There is also direct access
to the outdoor play area from the playroom. Children also use other
parts of Lasswade High School such as art rooms and the library for
additional activities. 
9. Midlothian Council officers have carried out an exercise inviting
external organisations to note interest in the space to deliver an ELC of
Childcare. This and any other potential options will continue to be
considered. 
10. The statutory consultation on the proposal was undertaken in the
period from Friday 29 November 2024 to Friday 24 January 2025. The
report on the outcome of the consultation was published on 10 March
2025, Appendix B, and provides full details of the process undertaken,
representations made and Education Scotland’s report on the proposal.
The report is available on the Council’s Citizen Space Consultation
page: 
https://midlothiancouncil.citizenspace.com/education/lasswade-hscs-
consultation 
11. The Education Service offered additional consultation sessions over
and above the required statutory public meeting. Further information on
these sessions can be found in the consultation report section 4. Three
members of the public attended the public meeting held in Lasswade
High School on Thursday 16 January 2025 at 18:30. 
12. A total of 62 responses to the consultation were received during the
period of the statutory consultation. 
13. 11 responses to the consultation were in favour of the proposal to close
Lasswade High School Childcare Service.   
14. 51 responses to the consultation were not in favour of the proposal to
close Lasswade High School Childcare Service. 
15. Education Scotland’s His Majesty’s Inspectors of Education (HM
Inspectors) prepare a report in accordance with the terms of the
Schools (Consultation) (Scotland) Act 2010 (“the 2010 Act”). The
purpose of the report is to provide an independent and impartial
consideration of Midlothian Council’s proposal (Appendix C). 
16. The Education Scotland report summary states: 
“HM Inspectors agree that the proposal has educational benefits. These could
include the potential for better transition arrangements. Staff may benefit from
improved access to leadership from ELC professionals, should they move to
provision in a nursery or primary school setting. Children should benefit from
appropriate spaces that facilitate the delivery of high quality ELC where they
will learn and play with other children at early level. However, there may be
potential to achieve this through enhancing the current setting. Should the
proposal be approved, the council will need to support staff and families to
transition to other provision.”
Page 42 of 222

Page 43

17.  The education service welcomes Education Scotland’s report and
should the proposal be approved, will continue to support and engage
with families regarding the availability of Early Learning and Childcare
settings in the local area. 
18. The consultation report was published on 10 March 2025 leaving the
required period of at least three weeks for further representations to be
made prior to Council’s consideration of the report and its decision
regarding the recommendations:
i. The closure of Lasswade High School Childcare Service from
September 2025. 
19. The recommendation of the consultation report is for Council to
approve the proposed closure of Lasswade High School Childcare
Service. 
4 Report Implications (Resource, Digital and Risk) 
4.1      Resource 
1. The financial implications of closing Lasswade High School Childcare
Service within Lasswade High School can be found in Appendix 2. 
2. Staff at Lasswade High School Childcare Service would be redeployed
and managed in accordance with the Policy for Managing Change
(LGWs). A mix of group and individual consultations will be undertaken
with recognised Trade Unions and all affected staff in the setting. 
4.2 Digital 
None 
4.3 Risk 
None 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
An Integrated Impact Assessment has been carried out and published,
Appendix D. 
4.4 Additional Report Implications 
See Appendix A. 
Page 43 of 222

Page 44

Appendices
Appendix A – Additional Report Implications 
Background Links
Appendix B – Consultation Report, March 2025
Appendix C – Education Scotland Report
Appendix D – Integrated Impact Assessment 
Appendix E – Consultation Proposal Paper, November 2024
Appendix F - Omissions, Corrections & Amendments 
Page 44 of 222

Page 45

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan
Not applicable 
A.2 Key Drivers for Change
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value
The implementation of the recommendation of this report will enhance
best value in the delivery of Council services. 
A.5 Involving Communities and Other Stakeholders
This report provides details of the statutory consultation undertaken
with communities and all stakeholders regarding the proposal to close
Lasswade High School Childcare Service.  
A.6 Impact on Performance and Outcomes
The report does not directly impact on Midlothian Council’s
performance and outcomes. 
A.7 Adopting a Preventative Approach
Not applicable 
A.8 Supporting Sustainable Development
Not applicable 
Page 45 of 222

Page 46

Midlothian Council
Tuesday 1 April 2025
Item No 8.2   
Intake Levels and Reserved Places for Primary and Secondary Schools
Session 2025/26
Report by Executive Director Children, Young People and Partnerships 
Report for Approval 
1 Recommendations 
Council is requested to 
• approve intake levels for Midlothian schools for academic session
2025/26 and reserve places for incoming catchment pupils; and
• delegate authority to the Executive Director Children, Young People and
Partnerships to amend the number of reserved places in consultation
with the Education Convener should the number of pupils requiring a
place at a school significantly increase or decrease. 
2 Purpose of Report/Executive Summary 
This report seeks the Council’s approval to set intake limits and the
number of reserved places in both primary and secondary schools to
safeguard places for catchment children and young people and to
manage placing requests. 
Date: 1 April 2025 
Report Contact: 
Fiona Robertson, Executive Director (Children, Young People and
Partnerships) Fiona.Robertson@midlothian.gov.uk 
Page 46 of 222

Page 47

3 Background 
3.1 The Education (Scotland) Act 1980 (as amended by section 33 of the
Education (Scotland) Act 1996) allows education authorities to reserve
places for incoming pupils into catchment areas of schools. This assists
education authorities in managing their schools and prevent them being
at capacity at commencement of an academic year and furthermore
enabling them to accommodate incoming catchment pupils at their
catchment schools when they move into the area during the academic
year. 
3.2 Section 28A (3A) of the Education (Scotland) Act 1980 (as amended)
provides a general principle that, so far as is compatible with the provision
of suitable instruction and training and the avoidance of unreasonable
public expenditure, pupils are to be educated in accordance with the
wishes of their parents. Acceptance of a placing request for a child who is
resident outwith the catchment area of a specified school could prevent
the education authority from retaining reserved places at a specified
school or in relation to any particular stage of education at the school. It is
for this reason that the education authority may refuse to grant a placing
request that would impact on the ability to reserve places in schools.
Reserved places are not allocated to children making placing requests.
The places are reserved for children who may move into the catchment
area during the academic year. 
3.3 Housing developments within Midlothian continue to generate growth in
pupil numbers. This, combined with parental placing requests for certain
schools means that pupil intake limits are required in order to safeguard
places for pupils to be able to attend their catchment school. 
3.4 The Council’s approach to pupil placement is to provide a place for every
pupil at one of their catchment schools and to grant placing requests for
siblings whenever this is possible. Where catchment schools are over-
subscribed the pupil placement process reserves places at neighbouring
schools to ensure every pupil is afforded the opportunity to attend a local
school. 
3.5 The following factors are considered for both primary and secondary
schools when determining the appropriate number of reserved places that
are likely to be required for pupils moving into the catchment area of the
school during 2025/26:
• The proposed level of capping at the school and number of
expected pupils
• The Local Development Plan
• Current and planned housing developments
• Projected school rolls
• Projected migration into the catchment area
• Information about reserved places from previous years
• School capacities
• Information known to us, for example, families indicating a move
into the area before/after commencement of the academic year
• Future planned expansion of the Learning Estate 
3.6 Pupil enrolment for the 2025/26 school session is well underway. 1,326
Midlothian primary pupils and 1,194 Midlothian secondary pupils have
Page 47 of 222

Page 48

been registered to date for the August 2025 intake. This includes 202 who
have advised they intend to defer entry to primary school. The legislative
deadline for the submission of placing requests is 15 March, and decisions
on those requests will be made and communicated by letter to
parents/carers at the end of April. To date, 264 placing requests have
been received, including 28 from outwith Midlothian, which is a reduction
in the requests made last year (302). The Education Appeal Committee
will be convened in May and June to consider any appeals received in
respect of placing requests which have been refused. 
Intake limits and Reserved Places Primary Schools 
3.7 At the time of writing, the deadline for placing requests had not passed.
These and deferrals are still being received and the intake limits and
reserved places in this paper are subject to change. The Council is asked
to agree a maximum intake level in P1 as set out below. 
Table 1: Primary 1 non-denominational schools’ intake limits and
reserved places August 2025 
Non-Denominational Primary
Schools
P1 intake limit
August 2025
Number of reserved
places
Bilston Primary School  52* 16
Bonnyrigg Primary School 63 3
Burnbrae Primary School 72 3
Cornbank St James Primary School 47 2
Cuiken Primary School  40 2
Danderhall Primary School 66 5
Easthouses Primary School 25 5
Gore Glen Primary School 56 2
Gorebridge Primary School 50 2
Hawthornden Primary School 45 2
King's Park Primary School 75 4
Lasswade Primary School 60 2
Lawfield Primary School 50 2
Loanhead Primary School 25 1
Mauricewood Primary School  56** 8
Mayfield Primary School 47 2
Moorfoot Primary School 14 1
Newtongrange Primary School 56 3
Paradykes Primary School 63 2
Rosewell Primary School 33 5
Roslin Primary School  63 12
Stobhill Primary School 33 2
Strathesk Primary School 54 1
Tynewater Primary School 33 1
Woodburn Primary School 110 4
Total 1288 
Page 48 of 222

Page 49

*This is a one-year increase in intake beyond the normal intake limit of 49. 
**This is a one-year increase in intake beyond the normal intake limit of 54. 
Table 2: Primary 1 denominational schools’ intake limits and
reserved places August 2025 
Denominational Primary Schools P1 intake limit
August 2025
Number of reserved
places
Sacred Heart RC Primary School 25 2
St Andrew's RC Primary School 25 2
St David's RC Primary School 25 2
St Luke's RC Primary School 25 2
St Mary's RC Primary School 25 2
St Matthew's RC Primary School 10 1
Totals 135 
3.8 When considering how to cap school rolls, Midlothian Council, as an
education authority, must look at all schools and available resources. The
total population of children who require places in schools is considered
and, at a local level, how many are within each catchment area. Each
school will manage its resources and this is balanced with other schools’
situations to ensure that resources are equitably shared throughout
Midlothian, thereby avoiding unreasonable public expenditure. 
3.9 The intake at denominational schools will be managed with the application
of pupil intake limits and by giving first priority to those who are baptised
Roman Catholic. Intake limits will be set in the context of the number of
applications from pupils who are baptised Roman Catholic, the availability
of suitably qualified teachers and the capacity of all schools serving each
catchment area. It is not anticipated that the number of baptised pupils
wishing to attend the denominational schools will exceed their intake
capacities. 
Intake Limits and Reserved Places Secondary Schools 
3.10 The table below shows the Secondary 1 intake limits and reserved places
for August 2025. 
Table 3: Secondary 1 intake limits and reserved places August 2025 
School Name S1 intake limit Number of
reserved places
Beeslack High School 150 6
Dalkeith High School  220* 17
Lasswade High School 320* 7
Newbattle High School 270 8
Penicuik High School 120 5
St David's RC High School 150 7
Page 49 of 222

Page 50

Total 1,230 
*The intake limits for Dalkeith and Lasswade have been increased
beyond their sustainable limits. The number of pupils will be monitored
as the Main Placing Round progresses to see whether the intake limits
can be reduced. 
3.11 Rolls at the high schools need to be capped to ensure places can be
reserved for pupils who may move into the catchment areas. Pupil
enrolment will be managed by use of intake limits, proactive management
of placing requests and early engagement with parents and schools on
the optimal placement of Secondary 1 pupils for August 2025. The intake
limits at Dalkeith and Lasswade may need to be reduced to below the
sustainable limit in future years to ensure the schools operate within
manageable capacity limits. 
3.12 Limiting the number of pupils that the school can admit each academic
session allows schools to timetable and employ a suitable number of
category of teachers. In general, capping will support appropriate and
early organisation for schools to meet their pupils’ needs for a high level
of education. Capping prevents detrimental impact on pupils’ education
and ensures effective and efficient management of resources by the
authority. 
Pupil Placement Guidelines 
3.13 Current policy guidelines on Admission to Primary and Secondary
Schools are included in Appendix D. 
Summary 
3.14 As in previous years, pupil intake for August 2025 will be assessed
regularly through the main placing round process, ensuring effective
management of the pupil placement process by taking account of placing
requests and reserving places in neighbouring schools to provide places
for pupils whose catchment school is over-subscribed. Intake limits based
on schools’ capacity will be applied as necessary in order to prevent
schools from exceeding their capacity. 
3.15 The letters confirming Primary 1 school places and the outcome of
secondary placing requests will be issued to parents/carers at the end of
April.  
Page 50 of 222

Page 51

4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
The Devolved School Management scheme sets out how resources are
allocated to schools with reference to roll and need. There are no direct
resource implications arising as a result of this report. 
4.2 Digital 
There are no direct resource implications for Digital. 
4.3 Risk 
The recent, ongoing, and planned house building in Midlothian is
resulting in increased pupil numbers. There is a significant risk that the
council will not have a place for every pupil at their catchment school and
the Learning Estate Strategy considers this from a strategic perspective.
In the short term this risk is mitigated by the application of limits on pupil
intake, reviews of placing requests, and, in the case of denominational
schools, by giving first priority to those who are baptised Roman
Catholic. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
This paper informs Council of the impact of managing pupil admissions
in line with national and local policy and procedure. IIA not required. 
4.5 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B - Primary School Pupil Census 2024
Appendix C - Secondary School Pupil Census 2024
Appendix D - Policy Guidelines - Admission to Primary and Secondary
Schools 
Page 51 of 222

Page 52

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan
Key outcome: Individuals and communities have improved health and
skills for learning, life and work 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
Limiting the number of pupils that the school can admit each academic
session allows schools to timetable and employ a suitable number of
category of teachers. In general, capping will support appropriate and
early organisation for schools to meet their pupils’ needs for a high
level of education. Capping prevents detrimental impact on pupils’
education and ensures effective and efficient management of
resources by the authority, aligning with Best Value. 
A.5 Involving Communities and Other Stakeholders 
This report informs Council of the potential impact on communities
arising from pressure on school places. 
A.6 Impact on Performance and Outcomes
The aim of this paper supports the priority to reduce the inequalities in
learning outcomes by improving the quality of learning and teaching,
leading to raised levels of achievement and attainment, by providing
every child with the opportunity to attend school in their local
community. 
A.7 Adopting a Preventative Approach 
Page 52 of 222

Page 53

The Council’s approach to pupil placement adopts a preventative
approach by maximising the opportunities for pupils to attend school in
their local community. 
A.8 Supporting Sustainable Development
The sustainability issues relating to this report relate to the sufficiency of
schools places particularly in areas of housing development, the
provision of additional capacity is being taken forward via the Learning
Estate Strategy coupled with the School Catchment Review Programme.
Page 53 of 222

Page 54

Appendix B – Primary Schools Pupil Census 2024 
School P1 P2 P3 P4 P5 P6 P7 Roll
Bilston Primary School 36 33 29 38 30 26 24 216
Bonnyrigg Primary School 50 58 62 61 59 66 60 416
Burnbrae Primary School 55 62 61 67 78 81 80 484
Cornbank St James Primary School 44 32 54 44 50 44 37 305
Cuiken Primary School 33 27 27 30 31 42 33 223
Danderhall Primary School 72 54 61 67 57 48 50 409
Easthouses Primary School 36 4 8 6 7 6 1 68
Gore Glen Primary School 44 54 45 61 51 50 42 347
Gorebridge Primary School 38 26 57 38 35 56 37 287
Hawthornden Primary School 39 32 43 46 36 32 45 273
King's Park Primary School 70 62 70 81 74 71 65 493
Lasswade Primary School 50 32 56 46 38 53 51 326
Lawfield Primary School 35 31 40 43 47 29 43 268
Loanhead Primary School 14 28 29 25 29 34 29 188
Mauricewood Primary School 45 44 55 50 49 48 39 330
Mayfield Primary School 42 37 37 40 36 35 41 268
Moorfoot Primary School 12 11 9 14 12 13 10 81
Newtongrange Primary School 48 51 51 54 56 51 56 367
Paradykes Primary School 55 54 52 48 52 46 37 344
Rosewell Primary School 31 24 27 27 34 24 21 188
Roslin Primary School 49 47 42 46 50 31 46 311
Sacred Heart RC Primary School 26 23 16 9 18 19 15 126
St Andrew's RC Primary School 21 17 23 17 22 22 25 147
St David's RC Primary School 26 21 26 30 27 29 25 184
St Luke's RC Primary School 16 25 23 28 30 31 27 180
St Mary's RC Primary School 24 26 26 27 27 23 32 185
St Matthew's RC Primary School 6 10 6 11 5 8 6 52
Stobhill Primary School 27 31 27 20 30 31 30 196
Strathesk Primary School 28 25 23 28 25 36 33 198
Tynewater Primary School 22 20 15 19 25 37 20 158
Woodburn Primary School 94 89 83 103 104 92 91 656
Grand Total 1188 1090 1183 1224 1224 1214 1151 8274 
Page 54 of 222

Page 55

Appendix C – Secondary Schools Pupil Census 2024
School S1 S2 S3 S4 S5 S6 Roll
Beeslack Community High School 133 149 144 145 107 78 756
Dalkeith High School 214 191 190 192 153 106 1046
Lasswade High School 310 298 299 300 270 177 1654
Newbattle High School 260 249 258 236 137 77 1217
Penicuik High School 128 130 126 107 105 76 672
St David's RC High School 144 132 149 146 122 108 801
Grand Total 1189 1149 1166 1126 894 622 6146 
Page 55 of 222

Page 56

Appendix D 
This Policy is authorised by Council
This Policy supersedes Version 13
This Policy was circulated to Public
Date of circulation October 2024
For further Information pupil.placement@midlothian.gov.uk
Review Date 2025 
Midlothian Council
Children, Young People and Partnerships – Education Policy
Admission to Primary and Secondary Schools.
Page 56 of 222

Page 57

Page 2
CYPP\EDU\APSS\POLICY\2024 
Contents 
Contents ..................................................................................................................................... 2
Policy statement ........................................................................................................................ 4
Definitions .................................................................................................................................. 4
Policy Content ............................................................................................................................ 5
1.0 PLACING IN SCHOOLS.................................................................................................................. 5
1.1 Legal background ....................................................................................................................... 5
1.2 Denominational Education ........................................................................................................ 6
1.3 Parents/Carers wishing a Gaelic Medium Education (GME) ...................................................... 6
1.4 Children with Additional Support Needs (ASN) ......................................................................... 6
1.5 Home to School Transport ......................................................................................................... 7
1.6 Composite Classes ...................................................................................................................... 7
1.7 Team Teaching ........................................................................................................................... 7
1.8 Children living under shared care .............................................................................................. 8
1.9 Reserved places.......................................................................................................................... 8
2.0 ARRANGEMENTS FOR PRIMARY SCHOOLS ................................................................................... 9
2.1 Registration procedures for entry to primary school ................................................................ 9
2.2 Press advertisements ................................................................................................................. 9
2.3 Contact with parents/carers ...................................................................................................... 9
2.4 Eligibility ................................................................................................................................... 10
2.5 Choosing a school .................................................................................................................... 10
2.6 Access to information .............................................................................................................. 10
2.7 Registration of catchment children ......................................................................................... 11
2.8 Enrolment of catchment children ............................................................................................ 11
2.9 Intake Numbers ........................................................................................................................ 12
2.10 Change of address .................................................................................................................... 12
2.11 Deferred entry to primary school ............................................................................................ 13
Page 57 of 222

Page 58

Page 3
CYPP\EDU\APSS\POLICY\2024 
2.12 Early admission ........................................................................................................................ 14
3.0 ARRANGEMENTS FOR SECONDARY SCHOOLS ............................................................................. 15
3.1 Eligibility ................................................................................................................................... 15
3.2 Transfer between primary and secondary schools .................................................................. 15
3.3 Primary-secondary liaison ........................................................................................................ 16
3.4 Induction programmes ............................................................................................................ 16
3.5 Registration procedures ........................................................................................................... 16
3.6 Allocation of Catchment Secondary School Places .................................................................. 17
3.7 Intake numbers ........................................................................................................................ 18
3.8 Issue of school handbooks ....................................................................................................... 18
3.9 Press advertisement ................................................................................................................ 18
4.0 Placing Requests for a Non-Catchment Primary or Secondary School .......................................... 18
4.1 Making a placing request for non-catchment Primary and Secondary schools....................... 18
4.2 What will happen when a placing request is made to Midlothian Council? ........................... 19
4.3 Restriction or limitation of places ............................................................................................ 20
4.4 Other relevant factors that may be taken into account .......................................................... 21
4.5 Refusing a placing request ....................................................................................................... 22
4.6 What happens if the Council refuses a request? ..................................................................... 23
4.7 Primary school placing request ................................................................................................ 23
4.8 Secondary school placing request............................................................................................ 23
4.9 Placing Requests for Children with Additional Support Needs ................................................ 24
5.0 Contact Information.................................................................................................................. 25
Implementation ........................................................................................................................ 26
Roles and Responsibilities ..................................................................................................... 26
Related documents .................................................................................................................. 26
Integrated impact assessment ................................................................................................ 26
Risk assessment ...................................................................................................................... 27
Review ...................................................................................................................................... 27
Page 58 of 222

Page 59

Page 4
CYPP\EDU\APSS\POLICY\2024 
Policy statement 
This document is the policy for admission to mainstream primary and secondary
schools for Midlothian Council. 
The policy will ensure consistency across all schools and provides information when
parents/carers are considering enrolling their child in a Midlothian Council school
and/or want to make a placing request. 
Definitions 
Composite Class: A class in which there are pupils at more than one stage of the
primary school. 
Denominational Education: Roman Catholic schools in Midlothian. 
Intake Numbers: The number of pupils to be admitted into a year group as decided by
the education service. 
Mainstream Schools: Classes within schools which meet the needs of the majority of
pupils and are not specialist provisions or special schools. 
Placing Request: A request for a placement in a school which is not the catchment
school for the address of the child/young person. 
Reserved Places: Places reserved for children and young people moving into the
school catchment through the year. 
School Catchment: An area from which children and young people are eligible to
attend a local school based on their residential address. 
Specialist Provisions/School: ASN provisions provide additional support for children
and young people who experience complex barriers to learning and development.
Midlothian Council also has a 5-18 special school called Saltersgate which supports
children and young people with severe and complex and/or medical needs. 
Team Teaching: Team Teaching is where two teachers teach a class that has more
than the maximum number of pupils for that particular stage.
Page 59 of 222

Page 60

Page 5
CYPP\EDU\APSS\POLICY\2024 
Policy Content 
1.0 PLACING IN SCHOOLS 
1.1 Legal background
The admission of pupils to both primary and secondary schools is defined in terms of
the Education (Scotland) Act 1980. Key points to note are:
• Parents/carers have the right to request admission to the school of their choice;
• Such a request must be in writing and is known as a placing request;
• The Council has a duty to accede to this request, except in certain
circumstances specified in the Act;
• The Council has a duty to inform parents/carers of their right to make a placing
request and to provide certain prescribed information in order to assist
parents/carers in making their choice of school. 
Catchment areas have been designated for all Midlothian primary and secondary
schools. Every residential address has a catchment denominational school and a
catchment non-denominational school for both primary and secondary education. The
parents/carers of all children known to the Council to be due to enrol for the first time in
a primary school or transfer from a primary to a secondary school shall be given
information about their catchment school options and notified of their right to request an
alternative school.
For all other stages, the onus is on the parent/carer to make enquiries regarding
alternative school placement for their child(ren). A parent/carer may submit a placing
request for their child in a school at any stage.
With the fastest growing population of any local authority in Scotland, Midlothian
Council continues to prepare to meet future demand in education. As a result, current
school catchment areas may change during this period of growth. For information on
open or completed school catchment area reviews, please visit the Council’s website at
www.midlothian.gov.uk/consultations
Page 60 of 222

Page 61

Page 6
CYPP\EDU\APSS\POLICY\2024 
1.2 Denominational Education 
In Midlothian all denominational schools are Roman Catholic. 
A child does not need to be Catholic to enrol in one of our Roman Catholic primary
schools or secondary school, but a place is not guaranteed for those not baptised
Roman Catholic. Where a Roman Catholic school is oversubscribed priority is given to
catchment Roman Catholic children who are baptised, and where parents/carers have
provided the baptismal certificate. We do not create additional classes for other
children if all baptised Roman Catholic children can be placed. 
1.3 Parents/Carers wishing a Gaelic Medium Education 
Gaelic Medium Education for Midlothian resident pupils is currently provided by the City
of Edinburgh Council. Midlothian Council will provide home to school transport for
pupils enrolled in Gaelic Medium Education. Currently, parents/carers wishing to have
their child/ren educated in the Gaelic Medium should make a placing request for the
Gaelic Medium primary school, Bun-sgoil Taobh na Pàirce or the Gaelic Medium Unit
at James Gillespie High School in Edinburgh. To apply for a place in either school the
parent/carer should complete a placing request form available on the City of Edinburgh
Council website. Further information can be found at: www.edinburgh.gov.uk/school-
places/gaelic-schools-1/1
Parents/carers can request that the Council carries out an assessment for the need for
Gaelic Medium primary education to be provided within the Council area. Further
information and an assessment request form are available from the following website:
www.gov.scot/Publications/2017/02/1442/downloads 
1.4 Children with Additional Support Needs (ASN) 
In line with legislation, we have a policy of including children with additional support
needs in mainstream schools where possible. Some children may be educated in
specialist schools/classes. Further information about additional support needs is
Page 61 of 222

Page 62

Page 7
CYPP\EDU\APSS\POLICY\2024 
available from the ASN, inclusion and wellbeing team, whose contact details are given
at the end of this document. 
1.5 Home to School Transport 
A pupil may receive free transport if they attend their catchment school and their home
address is more than two miles from the school based on the shortest recommended
walking route. A pupil may also receive free transport if the Council has placed them in
a non-catchment school due to a catchment school being full. From August 2017 pupils
resident in Loanhead who make a successful placing request for Secondary 1 at
Beeslack High School will also be eligible for free transport.
A pupil will not receive free transport if they attend a non-catchment school as a result
of a placing request being granted.
With the fastest growing population of any local authority in Scotland, Midlothian
Council continues to prepare to meet future demand education. As a result, the above
maybe subject to consultation, for information on open or completed education
consultation, please visit the Council’s website at www.midlothian.gov.uk/consultations. 
1.6 Composite Classes 
Composite classes are part of the normal organisation in many primary schools and
can have a maximum of 25 pupils. Age is the main criterion for selecting pupils for
composite classes. Normally composite classes will have a minimum of four pupils from
each year stage.
Please refer to Professional Practice Paper 7 for further guidance. 
1.7 Team Teaching 
Team teaching is where two teachers teach a class that has more than the maximum
number of pupils per teacher for that particular stage.
Page 62 of 222

Page 63

Page 8
CYPP\EDU\APSS\POLICY\2024 
The maximum size of a Primary 1 class size is 25, a Primary 2 or Primary 3 class is 30
and a Primary 4, Primary 5, Primary 6 and Primary 7 class is 33 pupils. 
1.8 Children living under shared care 
Where parents are separated the address of the parent in receipt of Child Benefit will
determine the address for school enrolment. Where child benefit is not being received,
the primary contact on education records will determine the address for school
enrolment.
If the shared care arrangement is a 50/50 split between the parents, the parents will be
asked to provide proof such as a legal agreement. If the Council is satisfied that the
care is equally shared, the parents will be given the opportunity to choose which of the
catchment schools at which to register. 
1.9 Reserved places 
The Education (Scotland) Act 1996, as amended by the Standards in Scotland’s
Schools etc. Act 2000, gives Education Authorities the power to reserve places at
schools for children who move into the catchment areas after enrolment has
completed.
With the level of house building and migration into the authority, Midlothian Council
continues to experience pressure on school rolls. After the allocation of places, in
accordance with Section 2.8 and 3.6, places will be reserved for children moving into
catchment.
In the Primary 1 year group, one place per class (and one place per teacher, where
team teaching is in place) is reserved for incoming catchment children for the entire
school year.
In the Secondary 1 year group, one place per 40 pupils is reserved for incoming
catchment children for the entire school year.
Where there are other considerations, such as house building in certain catchment
areas, the number of reserved places may be increased beyond the above ratios.
Page 63 of 222

Page 64

Page 9
CYPP\EDU\APSS\POLICY\2024 
For Roman Catholic schools, reserved places will only be granted to catchment
baptised Roman Catholic children.
If out of catchment places are granted by an Appeal Committee or a Sheriff, this may
result in fewer reserved places being available. 
2.0 ARRANGEMENTS FOR PRIMARY SCHOOLS 
2.1 Registration procedures for entry to primary school 
Registration procedures commence at the beginning of November each year. 
If an applicant’s catchment primary school is subject to a consultation review, they
should continue to register their child at that catchment school. Further information on
school consultations can be found at www.midlothian.gov.uk/consultations 
2.2 Press advertisements 
In October each year Pupil Placement will place an advertisement in the local press,
advising parents/carers of any child eligible to begin primary education that they
should, by a specified date, register their child at their catchment school. Registering a
child does not automatically ensure that a place will be made available; this will be
determined when all information is collated and examined.
Parents/carers will be advised that, even if they wish to make a placing request for a
non-catchment school, they must first register their child at the catchment school. 
2.3 Contact with parents/carers 
At the same time, Pupil Placement will contact by letter the parents/carers of all
children eligible to begin primary education and who receive funded early learning and
childcare (ELC) in Midlothian. Head Teachers must ensure school handbooks are
updated in time for the registration week in November. Delays in updating the
Page 64 of 222

Page 65

Page 10
CYPP\EDU\APSS\POLICY\2024 
handbook should be avoided as parents/carers are legally entitled to this information.
The handbook should be made available on the school website. 
2.4 Eligibility 
Any child whose fifth birthday falls between 1 March in any year and the last day of the
following February can start primary school on the first day of the autumn term, (known
as the commencement date).
An exception to these procedures may be where children who have been admitted to
primary education by another authority subsequently become resident in Midlothian. In
such cases, the Head Teacher should consult their Quality Improvement Manager
before deciding whether to admit the child. 
2.5 Choosing a school 
Pupil Placement will issue information informing parents/carers of their rights to choose
a school when they write to the parents/carers of eligible children. Any parent/carer
wishing to make a placing request can do so using the online form. It is not essential
that parents/carers use the form but they must make the request in writing to the Pupil
Placement Section within Children, Young People and Partnerships. It is essential,
however, that parents/carers initially register their child at their catchment school.
See the later section for information on placing requests. 
2.6 Access to information 
Parents/carers should have access to information about the schools in which they are
interested. This will generally be contained in the school prospectus or handbook,
copies of which will be available from the school and may be on the school website. In
addition, the Council produces guidelines on admission to Midlothian schools called
Placing in Schools, which is available on our website at:
www.midlothian.gov.uk/placingbooklet
Page 65 of 222

Page 66

Page 11
CYPP\EDU\APSS\POLICY\2024 
2.7 Registration of catchment children 
Primary Head Teachers may wish to publicise registration arrangements through their
own local channels if they feel this is appropriate, so that as many parents/carers as
possible are encouraged to register their children at this time. During the registration
period Head Teachers should only register those children who are normally resident in
their catchment area.
Head Teachers should ensure that catchment children are correctly identified; a
Council Tax bill, Government Benefit letter, (for example Child Benefit letter), recent
utility bill or driving licence is normally adequate proof. If the parent/carer is not liable
for Council Tax, two forms of proof of address are required instead of one. If the pupil
does not attend an associated early learning and childcare setting or receive funded
ELC from a partnership provider, their birth certificate or passport should be seen as
well. It is the address of the parent/carer which is relevant; the address of other family
members or a child minder with whom the child may occasionally reside is not relevant.
A Birth Certificate/Passport is not required if the child attends a Midlothian Council
school or Early Learning and Childcare setting or has a place at a private or voluntary
Early Learning and Childcare setting/childminder that is funded by Midlothian Council.
Military families who do not have proof of address should provide their Assignment
Order and their March-In-Date letter. If they are unable to provide these please contact
pupil.placement@midlothian.gov.uk for advice.
Registration and placing request forms and the facility to upload evidence:
www.midlothian.gov.uk/schoolplace.
Please note that registration does not guarantee a place at a catchment school.
See the earlier section for children living under shared care. 
2.8 Enrolment of catchment children 
The Pupil Placement Team will collate the registration information for each school and
use this to determine whether there is sufficient capacity to accommodate all catchment
children. Where there is insufficient capacity, priority will be given in the following order:
Page 66 of 222

Page 67

Page 12
CYPP\EDU\APSS\POLICY\2024 
• children who have been prioritised based on exceptional circumstances;
• children who are baptised Roman Catholic (Roman Catholic schools);
• children who will have siblings attending the school at the same time;
• then all remaining catchment children.
If there are more children than places available in any category, proximity of home to
school will normally be used. A sibling attending ELC at the same time will not be taken
into account.
Parents/carers will be advised in writing by 30 April, whether they have been granted a
place at their catchment school. Those children who have been granted a place will be
automatically enrolled at the school.
Once the place is offered it will not be withdrawn unless the place was obtained using
false information. If a family changes address before the start of the school year they
can request a place at their new catchment school.
Those who have not been granted a place at their catchment school will have a place
allocated at the nearest school within the associated school group with places
available. They will be given the option to make a placing request to another school, if
they so wish. The pupil will be placed on a waiting list for the catchment school in order
of priority and, should a place become available, parents/carers will be contacted by
Pupil Placement. 
2.9 Intake Numbers 
Pupil Placement will inform primary school Head Teachers of the number of catchment
pupils that will be enrolled and any intake limits that may apply. 
2.10 Change of address 
Children who move or are moving before the start of the school year, will have a place
reserved in their non-denominational or denominational catchment school based on
their address at the start of the school year. This is subject to places being available
and where proof of proposed change of address has been received by 15 March. The
Page 67 of 222

Page 68

Page 13
CYPP\EDU\APSS\POLICY\2024 
place will be allocated provisionally and will not be confirmed until proof has been
provided that the move has taken place. For families who are renting, acceptable proof
of change of address is a signed tenancy agreement. For families who are purchasing,
a letter from a solicitor confirming missives have been concluded is not sufficient to
enrol a child. The Council will ask for further proof by way of; a Council Tax bill,
Government Benefit letter, (for example Child Benefit letter), recent utility bill or driving
licence to accompany the concluded missives letter following the move. If the
parent/carer is not liable for Council Tax, two forms of proof of address are required
instead of one. Discretion can be used if the parent/carer is due to move a week prior
to the new term commencing.
In the final two weeks of the summer holidays acceptable proof of proposed change of
address for a place to be reserved are; a signed tenancy agreement; written
confirmation from the landlord; or a letter from a solicitor confirming missives have
been concluded.
Military families who do not have proof of address should provide their Assignment
Order and their March-In-Date letter. If they are unable to provide these please contact
pupil.placement@midlothian.gov.uk for advice.
Families residing in accommodation on a temporary basis should contact
pupil.placement@midlothian.gov.uk at the earliest opportunity. The Pupil Placement
team will provide further information and guidance. 
2.11 Deferred entry to primary school 
Children in Scotland usually start school between the ages of 4 years 6 months and 5
years 6 months old. Children who turn 5 between the start of the school year and the
end of February can apply to defer starting primary 1 for a year.
Children who are 5 on or before the first day of the school term in August must register
with their catchment school. In exceptional circumstances it may be possible to apply
for an additional year of ELC. This year is known as a “retained year”.
Page 68 of 222

Page 69

Page 14
CYPP\EDU\APSS\POLICY\2024 
Children who turn 5 after the first day of term in August and before the end of February,
these children are entitled to defer entry to school should their parents/carers wish it.
They will receive a funded ELC place in Midlothian, either a council, funded provider
setting or childminder during that deferred year. If your child attends a setting in
another local authority contact them to confirm funding arrangements. Please refer to
the deferral policy for more information about the process.
Deferred entry to primary school | Midlothian Council. 
Please note that all children must register at their catchment school for primary 1 even
if an application for deferred entry is being made.
If you change your mind and want to withdraw a deferral request for Primary 1, you
must contact Pupil Placement by 15 March 2025 at pupil.placement@midlothian.gov.uk
After this date, the main round of placing decisions will have taken place and there may
not be a place available at your child’s catchment school. In these circumstances we
may have to seek a place at an alternative primary school. 
2.12 Early admission 
Parents/carers may make a request for early admission to primary school. The Council
does not have a duty to educate a child who is not of school age, and it is the
professional view of the authority is that early learning and childcare is the most
appropriate form of education for these children.
The Council has delegated the responsibility of granting early admission to the
Executive Director, Children, Young People and Partnerships, but this will only be
considered if it can be established that refusal would harm a child’s education in the
long term.
When applying for early admission, parents/carers should provide evidence to support
their case, including written evidence wherever possible. Members of staff should not
provide letters of support to parents/carers.
There is no right of appeal once a decision has been reached on requests for early
admission as the child is not of school age.
Page 69 of 222

Page 70

Page 15
CYPP\EDU\APSS\POLICY\2024 
3.0 ARRANGEMENTS FOR SECONDARY SCHOOLS 
3.1 Eligibility
Pupils will normally transfer to secondary school at the end of a seven year course of
primary education. If, in the opinion of the Head Teacher or other professional advice,
there are exceptional circumstances which would make it inadvisable to transfer a
child, the appropriate Quality Improvement Manager should be consulted before a final
decision is made.
Pupils attending a non-denominational primary school will be allocated a place at their
catchment non-denominational secondary school. Pupils attending a denominational
primary school will be allocated a place at St David’s Roman Catholic High School. If
the parents/carers wish to request their other catchment secondary school they should
complete a placing request form and return it to the Pupil Placement section. 
3.2 Transfer between primary and secondary schools 
Pupil Placement will provide Head Teachers with details of which school each child will
be transferring from/to.
Head Teachers of primary schools should ensure that detailed information on each
pupil is forwarded to the appropriate secondary school. This information will normally
include:
• an assessment of the pupil’s attainment in mathematics and language;
• comments on ability and attainment in other curricular areas, e.g. science, art,
music;
• comments on special interests and aptitudes;
• an indication of the pupil’s personal attributes and information about their
background which may influence their attitude and performance in school work;
• the Pupil Progress Records (PPR), updated to the end of the last session of
primary education;
• the Pupil Profile, which is completed by the pupil.
Page 70 of 222

Page 71

Page 16
CYPP\EDU\APSS\POLICY\2024 
3.3 Primary-secondary liaison 
Secondary schools will normally have an established liaison programme with their
associated primary schools which will include other initiatives to ease the transition
between primary and secondary stages. 
3.4 Induction programmes
Primary schools and their associated and neighbouring secondary schools have
established procedures to ensure a smooth transition for all children. This includes
transfer of information about each child's progress.
Secondary Head Teachers should also arrange for parents/carers and incoming pupils
to visit their school at an appropriate time, prior to transfer. Full information on the
school should be sent at the start of the summer term to all parents/carers of pupils
transferring to the school.
Pupils who have submitted a placing request to a non-catchment school are still
required to attend their catchment school transition events until a placing request
decision has been made. 
3.5 Registration procedures 
All parents/carers of P7 pupils resident in Midlothian, who attend a primary school in
Midlothian, will receive written confirmation from Pupil Placement in November that
their child has been registered for a place at their catchment secondary school, based
on their home address. Places at secondary schools may be limited, so registration
does not guarantee a place. Parents/carers will also be advised of their right to make a
placing request.
See later section for information on placing requests. 
Midlothian pupils are enrolled in their catchment secondary schools through the
transfer of their details from their associated primary schools. Secondary schools need
to enrol those pupils whose placing requests have been granted which may include
non-Midlothian residents.
Page 71 of 222

Page 72

Page 17
CYPP\EDU\APSS\POLICY\2024 
3.6 Allocation of Catchment Secondary School Places 
The Council will normally give the highest priority to children living in the catchment
area of a school. In the event of a school having more catchment children than places
available, priority will be given in the following order: 
• children who have been prioritised based on exceptional circumstances;
• children who are baptised Roman Catholic (Roman Catholic schools only);
• children who will have siblings attending the school at the same time;
• children who attend an associated primary school;
• then all remaining catchment children. 
If there are more children than places available in any category, proximity of home to
school will normally be used.
If a place at a catchment school is not available, parents/carers will be offered a place
at the nearest Midlothian secondary school to their home address with places available.
They will be given the option to make a placing request to another school, if they so
wish. The pupil will be placed on a waiting list for the catchment school in order of
priority and, should a place become available, parents/carers will be contacted by Pupil
Placement. Where there are more pupils in one category, the priority will be based on
distance.
Once the place is offered it will not be withdrawn unless the place was obtained using
false information. If a family changes address before the start of the school year they
can request a place at their new catchment school.
Those who have not been granted a place at their catchment school will have a place
allocated at the nearest school with places available. They will be given the option to
make a placing request to another school, if they so wish. The pupil will be placed on a
waiting list for the catchment school in order of priority and, should a place become
available, parents/carers will be contacted by Pupil Placement.
Page 72 of 222

Page 73

Page 18
CYPP\EDU\APSS\POLICY\2024 
3.7 Intake numbers 
Pupil Placement will inform secondary school Head Teachers of the number of
catchment pupils that will be transferred from primary schools and any intake limits that
may apply. 
3.8 Issue of school handbooks 
Head Teachers must ensure school handbooks are updated in time for the registration
week in November. Delays in updating the handbook should be avoided as
parents/carers are legally entitled to this information. The handbook should be made
available on the school website. 
3.9 Press advertisement 
In October each year Pupil Placement will place an advertisement in the local press,
advising parents/carers of any Midlothian child eligible to begin secondary education
that their child will be automatically enrolled in their catchment secondary school,
unless a placing request is made for another school. 
4.0 Placing Requests for a Non-Catchment Primary or Secondary School 
4.1 Making a placing request for non-catchment Primary and Secondary
schools 
All parents/carers have the right to request a place for their child in a non-catchment
school; this is called a placing request. It is the Council’s statutory duty to grant placing
requests where there are places available, except in certain circumstances which are
set out in The Education (Scotland) Act 1980.
If the child is starting Primary 1 or Secondary 1 in August and the parent/carer wants
them to attend a non-catchment school, they may make a request by completing a
Page 73 of 222

Page 74

Page 19
CYPP\EDU\APSS\POLICY\2024 
Placing Request. The placing request form is available online at
www.midlothian.gov.uk/placing, alternatively a paper version of the form can be
obtained from Pupil Placement at pupil.placement@midlothian.gov.uk.
If the child is at any other stage of their education parents/carers should contact the
Head Teacher of the school of their choice.
When a placing request is submitted for a non-catchment school, the Council will ask
you to state the reason(s) the request has been made, for example exceptional
circumstances. Please note that the Council does not consider childcare arrangements
as exceptional circumstances.
All our mainstream schools provide for a wide range of additional support needs e.g.,
dyslexia, ADHD, ASD, hearing or visually impaired. Therefore, you will need to explain
why the requested school is the only school able to support your child’s needs.
The 2000 Standards in Scotland’s Schools Act states that children should attend
mainstream schools, unless there are exceptional reasons not to do so.
If the child has additional support needs the right to make a non-catchment placing
request includes the right to request a special school or special class. Parents/carers
who wish to make this kind of placing request should discuss their choice of school with
the child’s lead professional before making their request. 
4.2 What will happen when a placing request is made to Midlothian Council? 
The Midlothian closing date for placing requests to start Primary 1 or Secondary 1 in
August is in the preceding December. The Council will advise parents/carers of the
closing date in the letters sent out. The Council will still consider a request if it arrives
after this date but by 15 March, the national cut-off date.
The parent/carer will receive an automatic acknowledgement of their online application.
Placing requests received by email or post will receive an acknowledgement within
fourteen days of receipt by Pupil Placement. The Council will notify parents/carers of
the outcome of all placing request received by 15 March by the end of April.
Page 74 of 222

Page 75

Page 20
CYPP\EDU\APSS\POLICY\2024 
Placing requests received after 15 March will be decided within two months of receipt
and parents/carers notified. It is important that placing requests are submitted by 15
March providing all relevant information and supporting documents as exceptional
circumstances are not considered for requests received after this date.
Assistance in completing a placing request is available through the pupil placement
team at pupil.placement@midlothian.gov.uk.
The placing request forms for Primary 2 to Primary 7 and Secondary 2 to Secondary 6
can be obtained from Pupil Placement pupil.placement@midlothian.gov.uk. These
placing requests will be acknowledged within fourteen days of receipt and a decision
made within two months.
Members of school staff should not provide letters of support to parents/carers. 
4.3 Restriction or limitation of places 
The Council will give the highest priority to children living in the catchment area of a
school. Places remaining after catchment children are enrolled will be available for non-
catchment children.
Placing Requests
Non-catchment placing requests will be granted if there are places available after all
catchment children are accommodated and reserved places retained within the agreed
intake limit.
Additional classes will not be created for non-catchment children. 
Priority for places
Priority will be given to applicants in the following order (catchment and non-
catchment):
• children who have been prioritised based on exceptional circumstances;
• children who are resident in the school’s catchment area and are baptised
Roman Catholic (Roman Catholic schools only);
• children who are resident in Midlothian and are baptised Roman Catholic
(Roman Catholic schools only);
Page 75 of 222

Page 76

Page 21
CYPP\EDU\APSS\POLICY\2024 
• children who are resident in the school’s catchment area who will have siblings
attending the school at the same time. A sibling attending an ELC class will not
be taken into account;
• children who are resident in the school’s catchment area;
• children who are resident in Midlothian who will have siblings attending the
school at the same time. A sibling attending the an ELC class will not be taken
into account;
• children who are resident in Midlothian;
• children who are resident outside Midlothian and are baptised Roman Catholic
(Roman Catholic schools only);
• children who are resident outside Midlothian who will have siblings attending the
school at the same time. A sibling attending the an ELC class will not be taken
into account;
• then all other applicants. 
4.4 Other relevant factors that may be taken into account 
Attendance at an associated primary school (for requests in Secondary 1) may be
taken into account however it does not guarantee that a request will receive priority or
agreement.
Children have additional support needs (ASN) if they require support which is different
to that provided for other children of the same age. Staff in all schools in Midlothian are
skilled in meeting the needs of pupils and all can fully support pupils with a range of
additional support needs or those who are experiencing bullying. All schools have
transition processes in place to support children starting Primary 1 or Secondary 1,
including enhanced transition programmes for children who require more support.
When deciding whether to give a child priority on the grounds of exceptional
circumstances, the pupil placement team will consider whether the requested school is
the only school able to support the child’s needs.
If there is more than one placing request in any of the categories listed above, the
distance between home and school is measured using streets and/or footpaths by an
Page 76 of 222

Page 77

Page 22
CYPP\EDU\APSS\POLICY\2024 
online mapping site. The distance is measured from the front door of the home address
to the closest school gate, this might be the main school entrance or a rear entrance.
Once a pupil has completed a proper admission to the school they will not be asked to
transfer to another school against the wishes of their parents/carers in order to admit a
pupil who has moved into the catchment area.
A proper admission is one made under the policy of the Council based on correct
information from the parents/carers.
Please note that, if a placing request is successful, the child’s place at their
catchment school may be allocated to another child. If a parent/carer then
changes their mind and wishes their child to attend their preferred catchment
school, a place may not be available. 
4.5 Refusing a placing request 
If the Council refuses a placing request a letter will be sent to the parent/carer which
gives the reasons for the decision. The Education (Scotland) Act 1980 sets out the
reasons why a placing request may be refused.
The main reasons are: 
• an extra teacher would have to be employed;
• the Council would have to spend a significant amount to extend or alter the
accommodation at, or facilities provided in connection with, the school;
• an extra teacher would have to be employed, or additional class formed, at a
future stage of the child’s education;
• the number of children at the school would exceed the school’s capacity.
• to reserve places at the school for children moving into the catchment area;
• the order and discipline in the school would be seriously affected i.e. through
overcrowding;
• the educational wellbeing of pupils at the school would be seriously affected i.e.
through overcrowding or exceeding the relevant maximum class size;
Page 77 of 222

Page 78

Page 23
CYPP\EDU\APSS\POLICY\2024 
• the child’s education would be affected because the education at the school
requested is unsuitable. 
4.6 What happens if the Council refuses a request? 
If a placing request is refused, the parent/carer has the right of appeal. Appeals must
be lodged, in writing, no later than 28 days after the refusal letter being sent. Details of
how to make an appeal will be in the refusal letter sent to the parent/carer.
In Midlothian appeals are heard by the Education Appeals Committee. The Education
Appeals Committee is independent of the Children, Young People and Partnerships
Directorate. This is a formal legal process and further information will be sent on receipt
of the appeal. 
4.7 Primary school placing request 
If a place at the requested primary school is not available, a place will be reserved at
the preferred catchment primary school that the child has been registered at. However,
if no place is available at the preferred catchment school, then a place will be allocated
at the nearest school within the associated school group with places available. (if the
preferred school was a denominational school then a place will be allocated at a
denominational school if possible). A waiting list will be formed for the requested school
and/or catchment school and, should a place become available, the parent/carer be
contacted. 
4.8 Secondary school placing request 
If a place at the requested secondary school is not available, a place will be reserved at
the catchment secondary school. However, if no place is available at the catchment
secondary school, then a place will be allocated at the nearest Midlothian secondary
school to their home address with places available. A waiting list will be formed for the
Page 78 of 222

Page 79

Page 24
CYPP\EDU\APSS\POLICY\2024 
requested school and/or catchment school and, should a place become available, the
parent/carer will be contacted. 
4.9 Placing Requests for Children with Additional Support Needs 
The parents/carers of children recorded as having additional support needs also have
the right to make a placing request to a special school or a special class. If the Council
refuses the request, parents/carers are given a statement of the reasons for the
decision.
Under the terms of the Education (Additional Support for Learning) (Scotland) Act
2009, if parents/carers have been refused a placing request for a child with a
coordinated support plan (CSP), to a special school or a special class, a mediation
service is available to families of children with additional support needs, and they have
the right to appeal the decision. Appeals are dealt with by the Additional Support Needs
Tribunal for Scotland. Details of who to send your appeal to will be in the refusal letter
we send you.
Page 79 of 222

Page 80

Page 25
CYPP\EDU\APSS\POLICY\2024 
5.0 Contact Information 
Our office is closed to the public and the addresses below are for mailing only. 
ASN, Inclusion and Wellbeing
Midlothian Council
Children, Young People and Partnerships
Fairfield House
8 Lothian Road
Dalkeith
EH22 3ZG
Email: asn.team@midlothian.gov.uk 
Pupil Placement
Midlothian Council
Children, Young People and Partnerships
Fairfield House
8 Lothian Road
Dalkeith
EH22 3ZG
Email: pupil.placement@midlothian.gov.uk 
Useful Websites 
Midlothian Council Website: Midlothian Council Homepage
Find a school catchment: Find a school catchment | Midlothian Council
Parent Zone Scotland: Parentzone Scotland | Education Scotland
Education Scotland: Education Scotland | Education Scotland
Page 80 of 222

Page 81

Page 26
CYPP\EDU\APSS\POLICY\2024 
Implementation 
The policy will be implemented for the intake from August 2025. The policy will be
shared on the Midlothian Council website. School Handbooks should be updated to
reflect the revised policy. 
Roles and Responsibilities 
The Education Chief Operating Officer for Midlothian Council has overall responsibility
for this policy. 
Related documents 
Apply for a school place | Midlothian Council
Consultations | Midlothian Council
Deferred entry to primary school | Midlothian Council
Gaelic in schools – The City of Edinburgh Council
Gaelic Medium Primary Education: assessment request form - gov.scot 
Pupil registration and placing requests | Placing in schools booklet (midlothian.gov.uk)
Pupil registration and placing requests | (midlothian.gov.uk) 
Integrated impact assessment 
All new and revised policies must be subject to an integrated impact assessment to
ensure that the Council is compliant with legislation.
Page 81 of 222

Page 82

Risk assessment 
An updated policy will ensure that the admissions process remains effective, clear and
consistent to meet the enrolment requirements of the children and young people of
Midlothian fairly and effectively. This will reflect and incorporate any recent changes to
legislation, policies and procedures as well as schools’ circumstances. 
Review 
This policy will be reviewed on a two-year cycle with the next review being August 2025 by
Children, Young People and Partnerships 
Page 82 of 222

Page 83

Midlothian Council
Tuesday 01 April 2025
Item No 8.3 
Midlothian School Uniform and Clothing Policy 
Report by Fiona Robertson, Executive Director Children, Young People &
Partnerships 
Report for Decision 
1 Recommendations 
Council members are asked to note the national policy (September 2024) and
approve the expectations for Midlothian schools from August 2025 onwards. 
2 Purpose of Report/Executive Summary 
On 25 June 2024 a motion was heard at Council regarding school uniform and the
negative impact that expensive branded items can have on some Midlothian families.
The motion was passed and the Executive Director of Children, Young People &
Partnerships was asked to notify schools that unbranded uniform should be adopted.
This report provides an update on progress made towards this ambition. 
07 March 2025 
Report Contact:
Michelle Strong, Education Chief Operating Officer
Michelle.Strong@midlothian.gov.uk 
Page 83 of 222

Page 84

3 Background 
3.1 Definition
School uniform and clothing is any items of clothing and footwear worn during the
school day. This may include traditional items of unform; clothing for PE; clothing for
outdoor learning and clothing worn to attend trips activities or occasions during or
beyond the school day. 
3.2 Legal Context
There is no legal requirement for pupils to wear uniform when attending school in
Scotland. Schools are encouraged to have a uniform or clothing policy to support
pupils to identify with their school and to feel accepted, respected and connected.
School uniform can also help to promote attendance, reduce stigma and peer
pressure and support safeguarding. 
The United Nation’s Convention on the Rights of the child is clear that each of our
young people have the right to dignity, participation, social justice and the right to
belong. School uniform contributes to fulfilment of these rights. 
Responsibility for school uniform and clothing policy usually sits with individual
schools. 
3.3 National Guidance
In September 2024 Scottish Government published School uniform and clothing in
Scotland -Guidance for schools and education authorities. As well as a summary
document Scottish Government also released guidance for children and young
people (School uniform and clothing information for children and young people) and
for parents and carers (School uniform and clothing in Scotland – a resource for
parents and carers). 
The guidance sets out key principles that should underpin uniform and clothing
policies and what schools are expected to consider in the development,
implementation and review of these policies. 
Key principles:
School uniform and clothing policies should: 
• be informed by the views of pupils
• be informed by the views of parents, carers, teachers and school staff
• minimise the cost of school uniform and clothing for families
• consider and commit to fair and environmentally sustainable approaches
• support an inclusive, welcoming and equitable school culture
• promote equality, including recognising specific matters relating to religion and
belief, race, disability, sex, sexual orientation, gender reassignment and
pregnancy and maternity
• eliminate unnecessary barriers to participation and engagement of pupils in
school education
• apply to all school clothing, including PE and senior phase
• recognise the need for practicality, including in relation to weather and seasonal
needs
Page 84 of 222

Page 85

• recognise and build upon current good practice in schools
• support and encourage pupils to observe school uniform and clothing policies,
while recognising their individual needs, circumstances and identity
• continue the position of no legal requirement upon pupils to wear school uniform 
Branded items of Uniform
The national guidance is particularly explicit about branded items of uniform:
Schools should not include branded items of uniform as a compulsory part of their
policy nor should they specify the style of items of uniform, clothing, or footwear,
unless there is a practical reason to do so which would protect the health, safety or
wellbeing of pupils and staff. Focus should be on the practicality and suitability of
items to allow pupils to actively and safely participate in a range of learning activities,
including PE and sport.
(School uniform guidance, page 13) 
Branded items of uniform and PE kit are usually only available to purchase through a
specialist supplier and are often more expensive than purchasing generic uniform
items. These items may be more difficult to access locally which can create
challenges for parents and carers or lead to additional costs. 
For these reasons, branded items of uniform, including blazers, should not be
compulsory nor promoted or encouraged by schools. Instead, branded items should
only be included as an optional alternative to generic items of uniform. Schools
should carefully consider the inclusion of optional branded items. These
considerations should focus primarily on affordability and sustainability, and also take
account of equity, inclusion, pupil comfort and practicality. 
Where schools choose to include optional branded items, they should consider the
use of iron -on or sew on as a lower cost alternative as a lower-cost alternative to
purchasing branded items of clothing from specialist suppliers. Schools may wish to
consider the viability of providing badges at a low cost or other options to limit costs
for parents and carers. 
(School Uniform guidance, page 23) 
3.4 Midlothian position
Following the motion approved at Council in June 2025, the Parent & Learner Liaison
Officer (PLLO) consulted with pupils, parents and school leaders on school uniform
policy. This engagement confirmed that across Midlothian we have a range of
approaches to school uniform and strong opinions about key elements that schools
wish to retain such as P7 leavers hoodies. 
This feedback combined with the publication of national guidance in September 2024
has helped create expectations for all Midlothian schools but allows for local decision
making based on local context. 
3.5 Midlothian expectations
• All schools should have a school uniform and clothing policy, developed with
pupils, parents, and staff, which meets the needs of their pupils and wider school
community. 
• The school policy should reflect national policy in terms of affordability, equality,
diversity & inclusion and sustainability.  
• Schools should ensure their uniform policy is clear and accessible to pupils,
parents and carers, and available on the school website and handbook.
Page 85 of 222

Page 86

• Schools are asked to support families with access to pre-loved uniform and
should promote the school clothing grant.
• Schools should carefully consider their approach to special occasions, school
trips and dress-down days and mitigate any barriers to participation.
• Schools should limit the frequency of changes to uniform policy and changes
must be agreed through consultation and implemented over a period of time. 
3.6 Support for families
The cost of school clothing can be challenging for families especially with
replacements required throughout the year. There are a range of support available to
parents and carers to help them with the cost of school uniform and clothing. 
The school clothing grant is available to parents and carers who are in receipt of
certain benefits. In 2024/25 the grant pays £120 for primary pupils and £150 for
secondary school pupils. Parents and carers can apply for this if they feel they meet
the criteria. Further details on the Midlothian Council website. 
Most schools have arrangements in place for pre-loved clothing and uniform.
Information about this is available from directly from the school. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
Not applicable 
4.2 Digital 
Not applicable 
4.3 Risk 
Adopting a consistent approach across Midlothian schools will help to promote
positive school attendance and sense of belonging. Aligning with non-statutory
guidelines will reduce the risk of challenge from families. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
Midlothian is committed to equalities and ensuring our obligations in terms of
UNCRC. The revised school uniform guidelines will ensure that school policies are
developed in conjunction with children, staff and families and that costs are kept to a
minimum. 
4.5 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Midlothian School Uniform and Clothing Guidance for Schools
Page 86 of 222

Page 87

Page 87 of 222

Page 88

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Insert text here 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
Insert text here 
A.5 Involving Communities and Other Stakeholders 
Insert text here 
A.6 Impact on Performance and Outcomes 
Insert text here 
A.7 Adopting a Preventative Approach 
Insert text here 
A.8 Supporting Sustainable Development 
Insert text here 
Page 88 of 222

Page 89

Midlothian School Uniform and Clothing Guidance for Schools
Legal context
School uniform and clothing is the items of clothing and footwear expected to be worn during
the school day. This may include traditional items of unform; clothing for PE; clothing for
outdoor learning and clothing worn to attend trips activities or occasions during or beyond the
school day.
Although there is no legal requirement for pupils to wear uniform when attending school in
Scotland, all Midlothian schools are expected to have a uniform policy, collaboratively
developed and reflective of the local context. There are wide range of well-established reasons
for and benefits of school uniform such as supporting pupils to feel connected, reducing stigma
and support safeguarding, as well as contributing to the UNCRC right to dignity, participation,
social justice and belonging. 
Guidance
On 12 September 2024 the Scottish Government published non-statutory Guidance on school
uniform with the overarching ambition to ensure pupil comfort, happiness and freedom to learn
alongside removing barriers to participation. 
https://www.gov.scot/publications/school-uniform-clothing-guidance-schools-education-authorities/ 
Guidance was also produced for children and young people and for parents and carers.
The guidance sets out key principles that schools should consider when developing,
implementing and reviewing their school uniform policy.
School uniform and clothing policies should:
• be informed by the views of pupils
• be informed by the views of parents, carers, teachers and school staff
• minimise the cost of school uniform and clothing for families
• consider and commit to fair and environmentally sustainable approaches
• support an inclusive, welcoming and equitable school culture
• promote equality, including recognising specific matters relating to religion and belief,
race, disability, sex, sexual orientation, gender reassignment and pregnancy and
maternity
• eliminate unnecessary barriers to participation and engagement of pupils in school
education
• apply to all school clothing, including PE and senior phase
• recognise the need for practicality, including in relation to weather and seasonal needs
• recognise and build upon current good practice in schools
• support and encourage pupils to observe school uniform and clothing policies, while
recognising their individual needs, circumstances and identity
• continue the position of no legal requirement upon pupils to wear school uniform
Cost
School branded/ embroidered items of school uniform from specialist suppliers are generally
the most expensive options for parents and carers. The national guidance provides clear
statements about the actions that schools and local authorities should try to take to minimise
Page 89 of 222

Page 90

the cost of uniforms.is explicit about the need for a flexible policy that limits the costs for
parents and carers, this includes
• Adopt policies that mean all items needed for the year, plus a reasonable number of
spares or replacements, can be bought within the amount provided by the School
Clothing Grant.
• Include generic items that can be bought from a range of suppliers
• Use generic colours that are easily available from a range of suppliers
• Branded items of uniform and blazers should not be compulsory, nor promoted or
encouraged by schools 
Midlothian position
Midlothian Council is committed to reducing the cost of the school day reducing inequality. On
25 June 2024 a motion was heard at Council regarding school uniform and the negative impact
that expensive branded items were having on some Midlothian families. The motion was passed
and the Executive Director of Children, Young People & Partnerships was asked to notify
schools that unbranded uniform should be adopted.
Throughout the autumn term the Parent & Learner Liaison Officer (PLLO) consulted with pupils,
parents and school leaders on school uniform policy. This engagement confirmed that there are
a range of approaches to school uniform across Midlothian and strong opinions about key
elements that schools wish to retain.
In response to this Midlothian Council has developed a set of expectations for schools that
comply with national expectations but allows for local decision making. 
February 2025 
Midlothian expectations:
• All schools should have a school uniform and clothing policy, developed with pupils,
parents, and staff, which meets the needs of their pupils and wider school
community. 
• The school policy should reflect national policy in terms of affordability, equality,
diversity & inclusion and sustainability.  
• Schools should ensure their uniform policy is clear and accessible to pupils, parents
and carers, and available on the school website and handbook.
• Schools are asked to support families with access to pre-loved uniform and should
promote the school clothing grant.
• Schools should carefully consider their approach to special occasions, school trips
and dress-down days and mitigate any barriers to participation.
• Schools should limit the frequency of changes to uniform policy and changes must
be agreed through consultation and implemented over a period of time.
Page 90 of 222

Page 91

Midlothian Council
Tuesday 01 April 2025
Item No 8.4 
Mobile Phone Use in Midlothian Secondary Schools 
Report by Michelle Strong, Education Chief Operating Officer 
Report for Information 
1 Recommendations 
Council is asked to note the guiding principles for mobile phone use in Midlothian
Secondary schools, developed by headteachers in line with non-statutory guidance
published in Autumn 2024. 
2 Purpose of Report 
The purpose of the report is to outline the powers that headteachers have to limit the
use of mobile phone use in their school to protect the learning experience for all. The
report details the guiding principles that secondary headteachers have developed
and will implement across Midlothian secondary schools. 
07 March 2025 
Report Contact:
Michelle Strong, Education Chief Operating Officer
michelle.strong@midlothian.gov.uk 
Page 91 of 222

Page 92

2 
3 Background 
3.1 Mobile technology (phones, tablets, watches) are an integral part of the lives of
children, young people and families across Scotland. 
They can be useful tools to enhance learning, communication and social
experiences. They can also bring a sense of security for those walking to or from
school or engaging in activities after school hours. 
Mobile devices in school can also bring some challenges in terms of disruption in
class as well being used in cases of as bullying and harassment of other pupils or
staff. 
3.2 Non-statutory guidance was issued to schools in autumn 2024 to encourage
respectful and responsible use of mobile phones in schools. 
The guidance is clear that decisions about mobile phones rests with the headteacher: 
Scotland’s headteachers are empowered to act in the best interests of their pupils, to
support our hard-working teachers to ensure a consistent learning environment is
provided to all our pupils in our classrooms. 
That means empowering headteachers to take the steps they see fit to limit the use
of mobile phones in our schools, up to and including a full ban on the school estate
during the school day, if that is their judgement. Crucially the decision is one which
rests with Scotland’s headteachers, who know their pupils and their staff and who we
trust to take the best decisions in the interests of their school communities. 
3.3 Midlothian position
All Midlothian secondary schools have protocols in place for mobile phone use. The
practice differs but is effective for the individual school. 
Secondary headteachers have worked to develop a set of guiding principles for
mobile phone use across Midlothian secondary schools. 
3.4 Midlothian Council Principles 
Mobile Phone Use in Secondary Schools:  Guiding Principles and Policy   
Summary
All Midlothian secondary schools have policies in place to support a focused and
engaging learning environment, free from the distractions of mobile phone use.  This
document outlines the guiding principles behind these policies and provides a
summary of the key elements of the policies. 
Guiding Principles 
● Focus on Learning
Mobile phone use should not disrupt teaching, learning, or student engagement. 
● Wellbeing & Safety
Reducing distractions and social pressures linked to mobile phone use supports
student mental health and academic success. 
● Consistency & Fairness
The policy applies to all students, ensuring a uniform approach across the school.
Page 92 of 222

Page 93

● Parental & Staff Partnership
Parents, students, and staff must work together to enforce and support
responsible mobile phone use. 
General Policy
● Mobile phones must be switched off and out of sight during class time.
● Phones should be stored in bags, designated storage pouches, or secure
locations determined by each school’s individual policy.
● Phones cannot be kept in students’ pockets or placed on desks during lessons.
● Mobile phones may only be used during break and lunchtime unless a teacher
instructs otherwise for educational purposes.
● Persistent non-compliance will result in the phone being held centrally during
class time, with parental notification. 
Exceptions
● Certain department (e.g. PE) may have adapted policies based on specific
needs.
● Students requiring phone access for medical or wellbeing reasons may keep their
device on their person with prior approval. 
Non-Compliance Procedures
Schools will use their behaviour management policies to manage non-compliance. 
Parental Support
Parents and carers are encouraged to support schools by doing the following:
● Refraining from texting or calling students during class times. Urgent messages
should be sent via the school office.
● Reinforcing the importance of minimizing distractions for effective learning. 
Teacher Guidelines
To ensure consistent enforcement, teachers should:
● Clearly explain the purpose of the policy to students.
● Avoid physically handling students’ phones—students must place and retrieve
their own devices from storage.
● Regularly check that all phones are accounted for in designated storage areas.
● Only allow students to retrieve phones at the end of the lessons. 
3.5  Although Primary schools are much less impacted by mobile technology, a set of
guiding principles will be developed by primary headteachers for implementation in
August 2025. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
Not applicable. 
4.2 Digital 
Not applicable. 
Page 93 of 222

Page 94

4.3 Risk 
Not applicable. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
UNCRC rights of the child permeate the approaches taken by schools in relation to
school mobile phone use policy and daily practice. 
4.5 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Guidance on Mobile Phones in Scotland’s Schools - Mobile phones:
guidance for Scotland's schools - gov.scot 
Page 94 of 222

Page 95

5
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
Not applicable. 
A.5 Involving Communities and Other Stakeholders 
Stakeholders will be involved in the creation of local policy relating to school uniform. 
A.6 Impact on Performance and Outcomes 
It is hoped that by ensuring learners clothing is comfortable and free from barriers
they will be able to fully participate in school and learning. 
A.7 Adopting a Preventative Approach 
School uniform prevents stigma and creates a sense of belonging. 
A.8 Supporting Sustainable Development 
Environmentally sustainable approaches are a key principle for schools to embed in
policy. 
Page 95 of 222

Page 96

Midlothian Council
Tuesday 1 April 2025
Item No 8.5 
Midlothian Local Development Plan 2017 – Delivery Programme 
Report by Kevin Anderson, Executive Director Place 
Report for Decision       
1 Recommendations 
Council is recommended to: 
i. Note the outcome of the public consultation undertaken on the
draft Midlothian Local Development Plan 2017 (MLDP) Delivery
Programme;
ii. Approve the MLDP Delivery Programme (attached to the report in
Appendix B); 
iii. Note the position that a Strategic Environmental Assessment
(SEA) is not required as recommended by officers and on the
basis that a response has not been received from the Scottish
Government SEA Gateway Consultation Authorities on the pre-
screening notification for SEA of the draft MLDP Delivery
Programme; and 
iv. Instruct the Planning, Sustainable Growth and Investment Service
Manager to: inform the Scottish Government and interested
parties of the approval of the MLDP Delivery Programme; arrange
for copies to be placed in Council libraries; and for a copy to be
placed on the Council’s website. 
2 Purpose of Report 
2.1 This report asks Council to approve the MLDP Delivery Programme
(attached to this report as Appendix B).  The Delivery Programme has
been amended to incorporate comments received during a public
consultation undertaken on a draft version of the document between 20
December 2024 and 14 February 2025. 
Date:    7 March 2025
Report Contact: Grant Ballantine, Lead Officer Conservation and
Environment, Planning, Sustainable Growth and
Investment Service
grant.ballantine@midlothian.gov.uk 
Page 96 of 222

Page 97

3 Background 
3.1 The Town and Country Planning (Scotland) Act 1997, as amended by
the Planning etc. (Scotland) Act 2006 and the Planning (Scotland) Act
2019 (hereafter referred to as the Act) and associated Scottish
Government’s Local Development Planning Guidance May 2023
(hereafter referred to as the Regulations) requires a Delivery
Programme to be prepared in relation to its existing adopted local
development plan, the MLDP (not the replacement MLDP2 currently
being progressed).  The Act and associated Regulations requires the
Delivery Programme to be:
•   Subject to a minimum six-week public consultation;
•   To be prepared on a biennial basis;
•   For its production to be led by the Council’s Chief Executive
Officer (effectively delegated to the Planning Service); and
•   For it to be approved by Council (rather than Planning       
Committee). 
3.2 The Scottish Government Chief Planner wrote to all local authority
Chief Planning Officers in Scotland in June 2024 setting out the
Scottish Government’s expectation that planning authorities should
have an adopted Delivery Programme for their local development plan
by 31 March 2025 (the Scottish Government has been advised that the
Delivery Programme is being reported to Council at its meeting on 1
April 2025 and that the agenda papers are publicly available prior to the
31 March 2025 deadline). 
3.3 Delivery Programmes replace Action Plans which were previously
required for local development plans.  The most current Action Plan for
MLDP was approved by the Council in 2021.   
MLDP Delivery Programme 
3.4 This Delivery Programme relates to MLDP and not the ongoing work to
produce MLDP2.  While work is underway to produce MLDP2, MLDP is
the adopted local development plan for Midlothian and remains so until
it is superseded.  MLDP contains significant development allocations
and the policy framework against which planning applications in
Midlothian are assessed.  The Delivery Programme sets out how the
spatial strategy and development allocations are/will be delivered. 
3.5 The purpose of a Delivery Programme is to set out how the local
development plan’s spatial strategy and development allocations will be
delivered. Delivery Programmes must include: 
•   a list of actions required to deliver each of the policies and
proposals contained in the local development plan and an
explanation as to how those actions are to be taken;
•   the timescale for the conclusion of each such action; and 
•   the sequencing of, and timescale for, the delivery of housing
sites allocated in the local development plan. 
Page 97 of 222

Page 98

MLDP Delivery Programme Public Consultation 
3.6 At its meeting of 17 December 2024 Council approved the draft MLDP
Delivery Programme for public consultation for a minimum period of six
weeks.  The public consultation was undertaken over the eight-week
period 20 December 2024 to 14 February 2015.  In total 10 separate
bodies responded, raising 34 points.  Appendix B of this report provides
a summary of the responses received and a proposed Council
response to them.  These proposed changes have been incorporated
into a final version of the MLDP Delivery Programme for which
approval is sought from Council through this report.   
3.7 The Planning, Sustainable Growth and Investment Service undertook a
targeted public consultation on the draft MLDP Delivery Programme.
The document was available on the Council’s website and in Council
libraries.  The following were directly contacted to inform them of the
consultation and encouraged to engage: all Midlothian Community
Councils and the Midlothian Federation of Community Councils, those
who have registered an interest in MLDP2, Scottish Government,
Scottish Government Key Agencies including NHS Lothian,
Sportscotland, Pentland Hills Regional Park, Newbattle Abbey College,
adjacent local authorities, known owners and promotors of
development sites listed in the MLDP, Mineral Products Association
Scotland, Network Rail, Homes for Scotland, Midlothian Housing
Forum (social housing providers), Hub South East (Scotland) and
TWIC (The Wildlife Information Centre). 
Bodies Who Responded to the Public Consultation 
1 Roslin and Bilston
Community Council
6 Pentland Plants (Agent: John
Handley Associates)
2 Homes for Scotland 7 Midlothian Science Zone Group
3 Barratt-David Wilson
Homes (Agent: Lanpro)
8 University of Edinburgh (Agent:
Montagu Evans)
4 Cala Management Ltd.
and Allanvale Land
(Pentland) Ltd (Agent:
Stantec)
9 Transport Scotland
5 Lochay Homes (Agent:
TMS Planning and
Development Services)
10 SEPA 
3.8 A variety of comments were received, as set out in the summary in
Appendix B of this report.  A number of comments relate to pressure on
road infrastructure.  The house building industry submitted that further
housing allocations will be required in MLDP2.  In the summary of
responses in Appendix B, the proposed Council response sets out
these are matters for MLDP2.  The Local Housing Land Requirement of
8,851 homes for MLDP2 agreed by Council at its 25 June 2024
meeting was, as reported to Planning Committee on 29 October 2024,
accepted by the Scottish Government Reporter from the DPEA
(Planning and Environmental Appeals Division) who undertook the
Gate Check of the MLDP2 Evidence Report in 2024. 
Page 98 of 222

Page 99

3.9 Internal Council colleagues were consulted in the preparation of the
draft MLDP Delivery Programme. 
3.10 During the consultation, while working on MLDP2 matters and not
submitted as formal submissions, information was provided on behalf
of site owners of Additional Housing Development Opportunity sites
AHs2 (Burghlee, Loanhead) and AHs3 (Belwood Crescent, Penicuik).
Updates to Table 3 in the proposed Delivery Programme in Appendix B
of this report have been made to reflect these comments.  The updates
related to site constraints and status of the land respectively. 
3.11 In response to internally received elected member comments, sites
identified in previous Midlothian Local Plans (pre MLDP) have been
included in the Delivery Programme.  Therefore, the Delivery
Programme now provides information on all development sites
identified in the MLDP - the draft MLDP Delivery Programme had only
provided information on new sites allocated through MLDP. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
Where relevant to the Council, the resources required for delivering the
spatial strategy of the MLDP are/were identified in the Council’s
current/previous Capital Plans.  Landowners and developers taking
forward development allocations identified in the MLDP are responsible
for the relevant resource/investment necessary to implement the
relevant planning permissions. 
4.2 Digital 
There are no digital implications from this report. 
4.3 Risk 
The Council is required by Scottish Government to adopt a Delivery
Programme for its adopted local development plan by 31 March 2025.
Failure to not meet this within a reasonable timescale would result in
the Council not meeting this Scottish Government requirement – to
mitigate the risk the Scottish Government has been advised that the
Delivery Programme is being reported to Council at its meeting on 1
April 2025 and that the agenda papers are publicly available prior to the
31 March 2025 deadline. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
An integrated impact assessment (IIA) is not required for this report.
The Delivery Programme provides details on the delivery of the spatial
strategy of the already adopted MLDP which complied with the relevant
equalities requirements in 2017. 
Page 99 of 222

Page 100

4.5 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Background information/Links 
Page 100 of 222

Page 101

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Delivery of the spatial strategy of the MLDP relates to and supports the
delivery of all seven themes of the Single Midlothian Plan 2023-27. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
External work required by the Council to help deliver the spatial
strategy of MLDP would be procured following local government
procurement rules. 
A.5 Involving Communities and Other Stakeholders 
Communities and stakeholders were consulted on the draft MLDP
Deliver Programme. Responses received are set out in Appendix B of
this report. 
Internal Council colleagues were consulted in the preparation of the
draft MLDP Delivery Programme. 
A.6 Impact on Performance and Outcomes 
The MLDP sets out the Council’s adopted spatial strategy.  It provides
the policy framework against which development proposals and
planning applications are assessed.  It helps guide the location and
form of development in a manner consistent with Scottish
Government’s National Planning Framework 4.  
Page 101 of 222

Page 102

A.7 Adopting a Preventative Approach 
The MLDP policy framework helps assist the Council in resisting
development in locations, and in forms, it considers inappropriate and/
or undesirable and consequently helps prevent unacceptable impacts
on communities and the environment. 
A.8 Supporting Sustainable Development 
The spatial strategy and policy framework of the MLDP seek to
promote sustainable development, while accommodating the strategic
development requirements that were placed on the Council at the time
of its production.   
A Strategic Environmental Assessment (SEA) was undertaken as part
of the production and adoption of MLDP. 
The Council had sent a pre-screening notification to the Scottish
Government SEA Gateway setting out why it did not consider an SEA
necessary or appropriate for the MLDP Delivery Programme.
Reference was made to an SEA having already been undertaken on
the MLDP.  No response was received, and the Council is proceeding
on the basis no SEA is necessary for the Delivery Programme. 
APPENDIX B 
Background Papers 
Reports on the MLDP Draft Delivery Programme were presented to Planning
Committee at its meetings of 29 October 2024 and Council at its meeting of
17 December 2024. 
Documents Contained in Appendix B
i) Summary of public consultation responses received on MLDP Draft Delivery
Programme
ii) The Midlothian Local Development Plan 2017 Delivery Programme 2025-
2027 
Page 102 of 222

Page 103

Appendix Bi
Summary of Public Consultation Responses Received on Midlothian Local Development Plan 2017 Draft Delivery
Programme 2025-2027
(Public consultation undertaken between 20 December 2024 and 14 February 2025) 
No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
1 Roslin and
Bilston
Community
Council
Table 6, Water and
Drainage, Roslin
WwTW 
(Table 6 is now
Table 8 in the
updated Delivery
Programme
document in
Appendix B of the
Council report) 
1.1: Considers a firm date for delivery of the
Roslin Waste Water Treatment Works
growth project is required.
Modify Document: 
Final document to reflect latest
information from Scottish Water on
timing of Roslin WWTW project. 
Table 6, Education
and Table 7,
Education 
(now Tables 8 and
9 respectively in
the updated
Delivery
Programme
document in
1.2: Seeks deletion of references to the
replacement Beeslack High School and
replacement with text indicating that a
search for a suitable site will be undertaken
in consultation with all interested parties.   
No Change to Document: 
The Council has selected a site for
the replacement Beeslack High
School. 
Page 103 of 222

Page 104

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
Appendix B of the
Council report) 
No specific
location in the
document
1.3: States that the A701 relief road is
essential in relation to residential
development allocated in the Midlothian
Local Development Plan 2017. Considers it
unacceptable there is no date for its
completion. 
Modify Document: 
Final document to reflect latest
information on delivery of the A701
Relief Road. 
No specific
location in the
document
1.4: States junction improvements on the
A701 at Straiton are essential to make the
junction more usable for all modes of active
travel. Considers it is unacceptable that that
there is no date for completion of junction
improvements. 
Modify Document: 
Final document to reflect latest
information on A701 junction
improvements/ liaison with
Transport Scotland.
Various 1.5: States a timescale for delivery of the
Bush Loan/-A702 junction upgrade must be
provided in the document. 
Modify Document: 
Final document to reflect latest
information on the timescale for
delivery of the Bush Loan/ A702
junction.
Various 1.6: States it is unacceptable that delivery of
the Bush Loan/-A702 junction upgrade is
occurring before and taking priority over
delivery of the A701 Relief Road. Sets out
that development along the A701 corridor
was allocated on the basis of the A701
Relief Road project providing mitigation. 
No Change to Document: 
Comments noted. The Council is
working on progression of delivery
of the A701 Relief Road project. 
Page 104 of 222

Page 105

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
States further development must not be
given permission until this is resolved. 
2 Homes for
Scotland
Generic comment 2.1: Refers to the need to respond to the
Housing Emergency, the Local Housing
Land Requirement (LHLR) that Midlothian
Council has adopted, and states that sites
identified in the Draft Delivery Programme
for Midlothian Local Development 2017 with
factors inhibiting their delivery should be
deallocated (from the next local
development plan) if they are not considered
to be deliverable.  Also advocates
deallocation where landowner/promoter
have not marketed the site. 
No Change to Document: 
The points raised are noted, but
consider the matters are for
preparation of Midlothian Local
Development Plan 2 and its spatial
strategy. Deallocated site would
need to be replaced with other
replacement sites. 
Generic comment
on the document
2.2: Considers that draft Delivery
Programme will not comply with the Scottish
Government Local development planning
guidance (2023) Guidance.  Suggests that
for the Delivery Programme to meet the
requirements of the guidance requirements,
the Council should detail specific actions
that are required to deliver development
sites, timescales for this and state who is
responsible for addressing the action.   
Considers the draft Delivery Programme
does not adequately specify how the
interventions that may be required will be
No Change to Document: 
The Council considers it has
identified as reasonably as it can
the actions required and timescales
to deliver the development strategy
of Midlothian Local Development
Plan 2017. 
Page 105 of 222

Page 106

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
funded or identify a suitable pathway to
deliver longer term allocations.   
3 Barratt-David
Wilson Homes
(Agent: Lanpro)
Generic comment
on the document
3.1: Notes that delivery of houses, as set out
in Housing Land Audit 2024, except for one
year, is projected to be less than the
annualised Local Housing Land
Requirement (LHLR) value of 885 homes
(this is the LHLR of 8,851 homes for the 10
year MLDP2 divided by 10), Considers that
it is clear there is a need to allocate
additional sites in Midlothian Local
Development Plan 2.   
Considers that Delivery Programme should
appreciate that due to the requirements of
National Planning Framework 4 (NPF4)
windfall sites will be less likely to contribute
to the housing land supply pipeline in the
medium to longer term. 
No Change to Document: 
The matters raised are for the
production of Midlothian Local
Development Plan 2. 
Table 6, Education 
(Table 6 is now
Table 8 in the
updated Delivery
Programme
document in
Appendix B of the
Council report)
3.2: In relation to Gorebridge High School,
notes reference in the draft Delivery
Programme to a land identification study for
a new High School. Refers to the
Gorebridge Local Place Plan favouring a
High School at Barleyknowe Road, and
requests that the land at Barleyknowe Road
is considered in any future study of potential
locations for a new High School. This is a
No Change to Document: 
The matters raised are for the
production of Midlothian Local
Development Plan 2. 
Submission will be considered in
the production of the spatial
Page 106 of 222

Page 107

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
reference to information and a site
submitted by Barratt-David Wilson Homes to
the Midlothian Local Development Plan 2
Call for Ideas exercise promoting housing
and provision of land for a High School at
Barleyknowe Road, Gorebridge.   
strategy for Midlothian Local
Development Plan 2. 
4 Cala
Management
Ltd. and
Allanvale Land
(Pentland) Ltd
(Agent: Stantec)
Generic comment
on the document
4.1: Notes that the draft Delivery
Programme indicates a shortfall in the
number of houses built compared to
annualised Local Housing Land
Requirement (LHLR) value of 885 and
considers that Council should support new
housing in the right locations. 
Refers to Homes for Scotland/ Diffley study
and considers there is a wider shortfall in
housing provision.  Considers that the
Council should be supporting increased
windfall sites or additional allocation of
housing sites in Midlothian Local
Development Plan 2 to ensure this shortfall
is addressed and there is a flexibility built
into the future plan (Midlothian Local
Development Plan 2). 
No Change to Document: 
The matters raised are for the
production of Midlothian Local
Development Plan 2. 
Comment not
directly on the
document, but on
a site submitted to
4.2: Refers to a site of approximately 10ha
at West Straiton they have promoted
through the Midlothian Local Development
Plan 2 Call for Ideas exercise and consider
No Change to Document: 
Page 107 of 222

Page 108

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
the Council
through the Call
for Ideas exercise
undertaken for
Midlothian Local
Development Plan
2. 
that the Delivery Programme (for Midlothian
Local Development Plan 2017) could allow
for this proposal to come forward in part
before the A701 Relief Road (to also allow
for faster delivery of the Relief Road). State
the site would contribute enhanced green
network links and landscaping, as well as
the ability to integrate with the proposed
A701 Relief Road, and generate affordable
housing.   
The matters raised are for the
production of Midlothian Local
Development Plan 2. 
5 Lochay Homes
(Agent: TMS
Planning and
Development
Services)
Table 2, Villages
and rural
remainder
(Midlothian West
HMA), Wellington
School (AHs5)
5.1: Updated phasing provided for housing
site at Wellington School (AHs5)
No Change to Document: 
Noted. Phasing details will be
updated in production of Housing
Land Audit 2025. 
6 Pentland Plants
(Agent: John
Handley
Associates)
Table 3 and Table
7, Hs17 Pentland
Plants 
(Table 7 is now
Table 9 in the
updated Delivery
Programme
document in
Appendix B of the
Council report)
6.1: Confirms this allocated housing site (in
Midlothian Local Development Plan 2017) is
still being promoted by the owner and states
there is significant housebuilder interest in
the site.  States part of the business has
already relocated to the Scottish Borders,
but full relocation has been delayed due to
issues finding another site for the current
business operation. As a result, currently
precise delivery timescales are unknown.   
Modify Document: 
Update document to reflect
submitted comments on continued
promotion and developer interest. 
Submission will be considered in
the production of the spatial
strategy for Midlothian Local
Development Plan 2. 
Page 108 of 222

Page 109

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
7 Midlothian
Science Zone
Group
Various 7.1: Satisfied with the draft Delivery
Programme as written, but seeks
clarification on the timing of Bush Loan/
A702 junction improvements. 
Modify Document: 
Final document to reflect latest
information on the timescale for
delivery of the Bush Loan/-A702
junction. 
8 University of
Edinburgh
(Agent:
Montagu Evans)
Table 6, Transport,
A702/ Bush Loan
and A702/ A703
Damhead 
(Table 6 is now
Table 8 in the
updated Delivery
Programme
document in
Appendix B of the
Council report)
8.1: State the proposed upgrades of the
A702/ Bush Loan junction and the A702/
A703 junction are vital to allowing growth at
the Easter Bush Campus. State it is
essential that the Delivery Programme gives
appropriate weight and focus to the
importance of these improvements. 
Modify Document: 
Final document to reflect latest
information on delivery of road
infrastructure upgrades relating to
A701 Relief Road, the A702/ Bush
Loan junction and the A702/ A703
Damhead junction. 
The junction of the A702/ A703 is
Transport Scotland led and not part
of the A701 Relief Road project.
Transport Scotland has undertaken
recent work on the junction. 
Consider no change to the text of
the document on the importance of
the improvement of these is
required.
Various 8.2: The University would encourage
Midlothian Council to ensure that the
impacts of existing and proposed nearby
housing allocations do not prejudice or
No Change to Document: 
Comments noted. 
Page 109 of 222

Page 110

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
restrict capacity of the surrounding road
network to the detriment of the Midlothian
Science Zone. Consideration of wider
developments on the surrounding
infrastructure should be highlighted in the
context of recent and planned future
improvements to the road network in the
surrounding area. 
Table 4, Economic
sites e3 and Ec5
Oatslie, Roslin 
(Table 4 is now
Table 5 in the
updated Delivery
Programme
document in
Appendix B of the
Council report)
8.3: Allocated economic sites e34 and Ec5
at Oatslie, Roslin: The University requests
these allocations remain in Midlothian Local
Development Plan 2 and would welcome
further dialogue with Midlothian Council to
ensure that these sites are appropriately
reflected Midlothian Local Development
Plan 2. 
No Change to Document: 
Comments noted. The Council has
met with the University regarding
existing economic development
allocations at Oatslie. 
These are matters for consideration
in developing the spatial strategy
for Midlothian Local Development
Plan 2. 
Generic wider
comment
8.4: Langhill Farm: The University also
manage 250ha of livestock and agricultural
farms at Langhill and Dryden. This
landholding is critical to the operation of the
University facilities at the Bush Estate,
through the provision of land to
accommodate teaching and husbandry of
livestock, as well as deliver feedstock and
products for the operation of the Easter
Modify Document: 
Comments noted. 
Insert a reference on this matter
under the newly numbered Table 5. 
Page 110 of 222

Page 111

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
Bush facility. Supports the continued
protection of prime agricultural land from
development under policy ENV4 Prime
Agricultural Land. The University notes there
is no explicit reference to the importance of
this wider landholding in the Delivery
Programme. The linkage between the wider
landholding and University operations
should be acknowledged in the context of
the Delivery Programme. 
The University would emphasise the
importance of continuing engagement with
Midlothian Council with regards to ECON 7
‘Further Education Facilities’. 
9 Transport
Scotland
Tables 3, 4, 7: Site
Ec3 West Straiton 
Table 6: Transport, 
A702/ Bush Loan 
(Table 4 is now 5,
6 is now 8 and 7 is
now 9 respectively
in the updated
Delivery
Programme
document in
9.1: Transport Scotland wishes to continue
to be consulted on progress with the A701
Relief Road and the Bush Loan/ A702 link
road schemes as they has implications for
the A702 trunk road. Aware the A701 relief
road / A702 link road scheme is yet to be
approved. 
Notes the planning application for the Bush
Loan/ A702 junction is yet to be determined
and states Transport Scotland issued
comments on that application to Midlothian
Council. 
No Change to Document: 
Comments noted. 
Page 111 of 222

Page 112

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
Appendix B of the
Council report) 
Table 6: Potential
Improvements at
Straiton/A720 and
A702 
(Table 6 is now
Table 8 in the
updated Delivery
Programme
document in
Appendix B of the
Council report) 
9.2: Requests the Delivery Programme
should reflect initial discussions between
Transport Scotland and the Council on the
Straiton junction of the A701 and A720 City
Bypass. 
Modify Document: 
Amend document to reflect initial
discussions between Transport
Scotland and the Council on the
Straiton junction of the A701 and
A720 City Bypass. 
Final document to reflect latest
information on delivery of road
infrastructure upgrades relating to
A701 Relief Road and the A702/
Bush Loan junction.
Table 6: Transport, 
A702/ A703
Damhead 
(Table 6 is now
Table 8 in the
updated Delivery
Programme
document in
Appendix B of the
Council report) 
9.3: A702/ A703 Damhead junction: These
junction works are being led by Transport
Scotland Road Safety and are ongoing. 
Modify Document: 
Final document to reflect latest
information on delivery of road
infrastructure upgrades relating to
A701 Relief Road, the A702/ Bush
Loan junction and the A702/ A703
Damhead junction. 
Page 112 of 222

Page 113

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
Table 6: Transport,
Potential rail
station at
Redheugh 
(Table 6 is now
Table 8 in the
updated Delivery
Programme
document in
Appendix B of the
Council report) 
9.4: Redheugh rail station: States this was
not included within the Midlothian Local
Development Plan 2017 Transport Appraisal
and has subsequently not been included
within any other multi-modal appraisal to
determine whether this was the best
transport solution. A business case has not
been produced or initiated to show a new
rail halt is financially viable or deliverable at
this location. 
Modify Document: 
Amend document to reflect
comments submitted, but retaining
existing comments in the draft
Delivery Programme consulted
upon. 
Table 7, Transport,
Housing sites Hs0
Cauldcoats and
Hs1 Newton Farm 
(Table 7 is now
Table 9 in the
updated Delivery
Programme
document in
Appendix B of the
Council report) 
9.5: Transport Scotland states it is not
seeking any developer contributions from
developments for improvements to
Sheriffhall roundabout and states this text
should be removed.
No Change to Document: 
Comments noted. No reference is
currently made in the draft Delivery
programme on seeking developer
contributions from these sites
towards grade separation of the
Sheriffhall junction. The adopted
Midlothian Local Development Plan
2017 requires developer
contributions from these sites
towards grade separation of the
Sheriffhall junction. No change is
proposed to the Midlothian Local
Development Plan 2017 in respect
of this submission from Transport
Scotland. These requirements for
Page 113 of 222

Page 114

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
developer contributions towards
this grade separation were
established in the Midlothian Local
Development Plan 2017 when it
was adopted in 2017. 
Table 7, Transport,
Housing sites
Hs16- Hs20 
(Table 7 is now
Table 9 in the
updated Delivery
Programme
document in
Appendix B of the
Council report) 
9.6: Transport Scotland note the A701 Relief
Road and Bush Loan/ A702 link road
scheme is yet to be approved. Transport
Scotland request to be consulted if it is to be
progressed. 
No Change to Document: 
Comments noted.
Table 4: Sites Bt1-
Bt3 – Easter Bush 
Table 7, Transport,
Economic sites
Ec4-Ec5 & Bt1-Bt3
& Mx1 (and
elsewhere as
appropriate) 
(Table 4 is now 5
and 7 is now 9
9.7: Economic Sites Ec4-Ec5 & Bt1-Bt3 &
Mx1: Table 7 (and elsewhere as appropriate)
should note the planning application for a
new roundabout to replace the A702 / Bush
Loan junction is yet to be determined. 
States Table 4 indicates development within
the Easter Bush Estate is significantly
constrained by connection of Bush Loan
with the A702 trunk road. It should be noted
that the planning application for a new
roundabout to replace the A702(T) / Bush
Modify Document: 
Amend the document, as
appropriate, at the time of
publication of the Delivery
Programme to reflect the status of
the panning application of the A702
/ Bush Loan junction upgrade. 
Comments noted. 
Page 114 of 222

Page 115

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
respectively in the
updated Delivery
Programme
document in
Appendix B of the
Council report) 
Loan priority junction, is to be determined.
Transport Scotland’s comments to that
planning application have been issued to
MLC.
Table 8: STRAT 2
Windfall Housing
sites 
(Table 8 is now
Table 10 in the
updated Delivery
Programme
document in
Appendix B of the
Council report) 
9.8: States it would be appropriate to require
unplanned sites to be considered against
the most up to date local development plan
Transport Appraisal in order to demonstrate
that the planned infrastructure remains
appropriate or if further infrastructure is
required. 
No Change to Document: 
Comment noted. Will consider
appropriate means of achieving
this. 
Table 8: STRAT 3 
Strategic Housing
Land Allocations,
STRAT 4 
Additional Housing
Development
Opportunities 
and
STRAT 5 Strategic
Employment Land
Allocations 
9.9: Recommends that a regular review of
local development plan Transport Appraisal
is undertaken to identify whether planned
infrastructure requirements remain
appropriate or require amendment.
No Change to Document: 
Comment noted. Will consider
appropriate means of achieving
this. 
Page 115 of 222

Page 116

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
(Table 8 is now
Table 10 in the
updated Delivery
Programme
document in
Appendix B of the
Council report) 
Table 8: DEV 2 
Protecting Amenity
within the Built-Up
Area 
(Table 8 is now
Table 10 in the
updated Delivery
Programme
document in
Appendix B of the
Council report) 
9.10: Where the table in this location sets
out in the “Observations” section that Road
Safety is a gap that should be considered,
Transport Scotland requests that they be
included in any discussions relating to Road
Safety affecting trunk roads within
Midlothian.
Modify Document: 
Amend the document so that
Transport Scotland is included in
any discussions relating to Road
Safety affecting trunk roads within
Midlothian. 
Table 8: TRAN 1
Sustainable Travel 
(Table 8 is now
Table 10 in the
updated Delivery
Programme
9.11: Request that Transport Scotland is
included in any discussions relating to active
travel affecting trunk roads within the
Council area. 
Modify Document: 
Amend the document so that
Transport Scotland is included in
any discussions relating to active
travel affecting trunk roads within
Midlothian.
Page 116 of 222

Page 117

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
document in
Appendix B of the
Council report) 
Table 8: RD 1
Development in
the Countryside 
(Table 8 is now
Table 10 in the
updated Delivery
Programme
document in
Appendix B of the
Council report)
9.12: States the document should note there
is a specific requirement to consult with
Transport Scotland where rural development
requires new/ improved access from the
trunk road network.
Modify Document: 
This occurs already through the
planning application process, but
amend the document so that
Transport Scotland is consulted
where rural development requires
new / improved access from the
trunk road network. 
Final document to reflect latest
information on the timescale for
delivery of the Bush Loan/-A702
junction. 
Table 8: IMP 1
New Development 
(Table 8 is now
Table 10 in the
updated Delivery
Programme
document in
Appendix B of the
Council report) 
9.13: States the ongoing monitoring of this
policy should clearly demonstrate where
contributions towards strategic infrastructure
(including any infrastructure associated with
the trunk road network) are being collected,
and update the intended delivery
mechanism for any such infrastructure.
No Change to Document: 
Comment noted.
Page 117 of 222

Page 118

No. Respondent Document
Section
Requested Changes or Comments Midlothian Council Proposed
Response 
Table 8: IMP 2 
Essential
Infrastructure
Required to
Enable New
Development to
Take Place 
(Table 8 is now
Table 10 in the
updated Delivery
Programme
document in
Appendix B of the
Council report) 
9.14: Linked comment on policy IMP 1,
ongoing monitoring of this policy should
explicitly identify the delivery mechanism
(who and when) for strategic infrastructure.
A specific example being A701 relief road
and A702 Link and Bush Loan junction.
No Change to Document: 
Comment noted.
10 SEPA All 10.1: Stated they had no comment on the
document.
No Change to Document: 
Comment noted. 
Page 118 of 222

Page 119

Council meeting 1 April 2025 
Appendix Bii:  Proposed for Approval: Midlothian Local Development
Plan 2017 Delivery Programme 2025-2027 
MIDLOTHIAN LOCAL DEVELOPMENT PLAN 2017 
Delivery Programme 2025-2027 
for Midlothian Local Development Plan (2017) 
Page 119 of 222

Page 120

Contents
Page 1 
Contents 
Introduction ........................................................................................................................................ 2
Background .................................................................................................................................... 2
What is a Delivery Programme ......................................................................................................... 2
Preparation and Engagement on the Delivery Programme ................................................................ 2
Updating the Delivery Programme ................................................................................................... 2
Housing Land Pipeline......................................................................................................................... 3
Economic Land ................................................................................................................................. 13
Infrastructure Delivery ....................................................................................................................... 20
Site Specific Actions ......................................................................................................................... 30
Policy Actions ................................................................................................................................... 53 
The styling of this document is based on the Scottish Government’s National Planning Framework 4. 
It is available here and was published under this licence.
Page 120 of 222

Page 121

Part 1 – Introduction 
Page 2 
Introduction 
Background
1. This is the Delivery Programme 2025-2027 for the Midlothian Local Development Plan 2017. It
replaces the Action Programme adopted by Midlothian Council on 15 June 2021. This Delivery
Programme identifies actions and commitments necessary to deliver the spatial strategy of the
adopted Midlothian Local Development Plan 2017. The Delivery Programme has been produced to
inform and align with the Council’s Capital Plan. The requirement to prepare delivery programmes
were introduced by the Planning (Scotland) Act 2019. The Scottish Government Chief Planner has
written to planning authorities to require that action programmes associated with local development
plans be reviewed, updated and re-published as delivery programmes, and for this to be done by 31
March 2025. 
2. The Midlothian Local Development Plan (MLDP 2017) was adopted in November 2017 and the first
Action Programme approved in February 2018. This first Delivery Programme highlights the
progress made with implementing MLDP 2017’s its development strategy in the years since
adoption, the key changes in that period and emerging issues from the ongoing review of the Plan. 
Another Delivery Programme will be prepared for the replacement LDP (Midlothian Local
Development Plan 2 - MLDP2). The draft Delivery Programme for MLDP2 will be released at the
same time as the MLDP2 Proposed Plan is published and finalised within three months of MLDP2
being adopted. Once MLDP2 is adopted, the current adopted MLDP 2017 and its Delivery
Programme will lapse. 
What is a Delivery Programme
3. A Delivery Programme sets out how an authority proposes to implement its LDP (local development
plan).  It should support delivery of the LDP and achievement of its intended outcomes.  Delivery
Programmes must set out:
• a list of actions required to deliver policies and proposals contained in the LDP;
• an explanation as to how those actions are to be undertaken;
• the timescale for the conclusion of each action; and
• the expected sequencing of, and timescales for, delivery of housing on sites allocated by the
LDP. 
Preparation and Engagement on the Delivery Programme
4. Collaboration is important to allow partners to input to the development of the Delivery Programme.
This includes engagement with internal service providers such as Education, with Key Agencies
including Scottish Water, the Scottish Environment Protection Agency, NatureScot, Historic
Environment Scotland and Transport Scotland; and with developers and any other organisation
named in the document.   The Council has used information gathered in preparing the Evidence
Report and Call for Ideas to help inform the preparation of this Delivery Programme.  There was a
formal engagement stage lasting eight weeks for any interested party to submit comments, and this
has resulted in changes between the draft and final Delivery Programme.   
Updating the Delivery Programme
5. The Delivery Programme must be kept under review and updated at least every two years.  In
practice, the next Delivery Programme will be for the MLDP2 Proposed Plan. 
Page 121 of 222

Page 122

Part 2 – Housing Land Pipeline 
Page 3 
Housing Land Pipeline 
6. National Planning Framework 4 (NPF4) expects Delivery Programmes to establish a deliverable
housing land pipeline for the Local Housing Land Requirement. In Midlothian’s the Local Housing
Land Requirement (LHLR) is 8,851 homes. For clarification this Delivery Programme relates to the
delivery of the development strategy and development allocations made in MLDP 2017. It will be for
MLDP2 to identify housing that will meet and deliver the LHLR of 8,851 homes over its 10 year
lifespan. That 10 year life span for MLDP2 is projected to be 2026/2027 to 2036/2037. 
7. The LHLR was considered by the Scottish Government Planning and Environmental Appeals
Division (DPEA) at the Gate Check of the Evidence Report for MLDP2 in 2024. The DPEA Reporter
who undertook the Gate Check concluded that the Council may proceed to prepare MLDP2 on the
basis of this LHLR of 8,851 homes. The 2024 decision of the Court of Session case at “Mossend”,
West Lothian (Miller Homes v Scottish Ministers) has confirmed that NPF4 is operative, including for
local development plans adopted prior to Scottish Government’s approval and publication of NPF4. 
MLDP 2017 was prepared in the context of the 2013 Strategic Development Plan for Edinburgh and
South East Scotland (SESplan).  Paragraph 2.3.9 of MLDP 2017 contains actions for always
maintaining a 5-year housing land supply, which included the Action Programme identifying the
trigger for introducing actions to address a shortfall in the housing land supply. With the status of
NPF4 confirmed, this requirement to maintain a 5-year effective housing land supply is removed. 
8. The purpose of the housing pipeline is to provide a transparent view of the delivery phasing of
housing allocations so that interventions, including for infrastructure that enable delivery, can be
planned. Phasing is set out in the short (1-3 years), medium (4-6 years) and long term (7-10 years). 
NPF4 requires that where sites in the early phases of the housing land pipeline are not delivering as
programmed, and alternative delivery mechanisms identified in the Delivery Programme are not
practical, measures should be considered to enable earlier delivery of long-term deliverable sites or
areas that were identified for new homes beyond the 10-year horizon of the delivery programme.
Deallocations from previous local development plans should be considered where sites are no
longer deliverable. The annual Housing Land Audit will monitor the delivery of housing land to inform
the pipeline and the actions to be taken in the Delivery Programme. Table 1 below sets out the
housing land pipeline over the short, medium and long term. Table 2 provides this information in
greater detail, broken down into individual allocated sites.   
9. For this Delivery Programme, Midlothian Council has chosen to use its most up to date (2024)
Housing Land Audit as the basis for its housing land pipeline. The HLA is based on discussions with
house builders on when they expect to deliver their sites. A large determinant of build rates however
are the prevailing market conditions, and in the case of affordable housing, the availability of
funding. Once sites are allocated, Midlothian Council has traditionally been keen for the sites to
come forward as soon as possible, subject to the delivery of any necessary infrastructure.  For
MLDP2, Midlothian Council will consider the extent to which allocations may be linked more closely
to build rate commitments and concomitant infrastructure delivery so that housing land can be
delivered in a more planned way, as indicated by NPF4.   
10. Housing delivery over the next 10 years will come from sites allocated in MLDP2, MLDP 2017, sites
allocated in the previous development plans, and windfall developments.  MLDP 2017 also indicates
long term safeguards at five of the large allocations. On some of these sites planning permission has
Page 122 of 222

Page 123

Part 2 – Housing Land Pipeline 
Page 4 
been granted, and so they have entered the effective housing land supply.  n addition to the
allocated sites, MLDP 2017 indicated Additional Housing Opportunities.  These are sites subject to
development uncertainties, and so were not relied on in meeting SESplan housing requirements. 
Two of these five sites have subsequently been granted consent, the other 3 remain constrained.   
Table 1 indicates the expected build rates from Housing Land Audit 2024.  These build rates form
the basis of the Delivery Programme, as it is the Council’s view that the HLA, based on direct
engagement with housebuilders, offers the most accurate forward view of completion dates.   
Table 1:  Delivery Pipeline 
Expected Build Rates
(from 2024 HLA)
Annualised Indicative
LHLR Difference
Short Term
2024/2025 755 885 -130
2025/2026 1020 885 +135
2026/2027 737 885 -148
Medium Term
2027/2028 741 885 -144
2028/2029 713 885 -172
2029/2030 739 885 -146
Long Term
2030/2031 686 885 -199
2031/2032 548 885 -337
2032/2033 462 885 -423
2033/2034 467 885 -418
TOTAL 6,868 8851 1,983 
11. Higher Bank of England interest rates from 2022 onwards appear to have led to a cut in completions
in the immediate short term.  Cuts to the affordable housing programme in the 2024 Scottish budget
(now partly restored) are another non-planning related factor which will weigh on future delivery
rates. 
12. The annualised shortfall between the indicative LHLR and delivery pipeline increases in the longer-
term perspective – this is because allocated sites are built out and also reflects the role of windfall
housing sites, whose contribution is unprogrammed until they are consented, and so the
contribution from these are concentrated in the short and medium terms.  In the face of the
annualised completions being less than the annualised MATHLR figure (Minimum All Tenure
Housing Land Requirement set out for each Council area in NPF4), NPF4 states that in the first
instance measures should be identified in the Delivery Programme to bring sites forward. Following
that measures should be considered to enable earlier delivery of long-term deliverable sites or areas
identified for new homes beyond 10 years. Table 3 considers the local or site-specific factors
inhibiting delivery and considers possible solutions.  Detailed site-specific requirements from MLDP
2017 (or as modified following later information) are set out in Table 4.   
Page 123 of 222

Page 124

Part 2 – Housing Land Pipeline 
Page 5 
Table 2: Completions by Site (based on approved 2024 Housing Land Audit) 
Site Code Site Source  Site Name 
Short Term
2024/2025 -
2026/2027 
Medium Term
2027/2028 -
2029/2030 
Long Term
2030/2031 -
2033/2034 
Post 2034 
Loanhead   
h54(iii)  Previous LP  Ashgrove Phase 3  6  0  0  0 
2022LH1  Windfall  Former Thornlea Nursing Home  1  0  0  0 
Small sites  Windfall     3  1  3  0 
Total      10  1  3  0 
Roslin and Bilston   
Hs18  MLDP 2017  Roslin Institute  101  0  0  0 
Hs19(Area A)  MLDP 2017  Roslin Expansion Area A  66  0  0  0 
Hs19(Area B)  MLDP 2017  Roslin Expansion Area B  1  0  0  0 
Hs19(Area C)  MLDP 2017  Roslin Expansion Area C  3  0  0  0 
Hs19(Area D)  MLDP 2017  Roslin Expansion Area D  4  0  0  0 
Hs16(Area C)  MLDP 2017  Seafield Road Area C  20  120  74  0 
Small sites  Windfall    0  0  0  0 
Total      195  120  74  0 
Penicuik   
h58(Areas B1and B2)  Previous
Local Plan Nursery West and North (at NW Penicuik)  48  0  0  0 
h58(Areas C and D)  Previous
Local Plan
Mauricewood and Mauricewood North (at NW
Penicuik)  56  0  0  0 
h58(Area F)  Previous
Local Plan Rullion Road (at NW Penicuik)  48  20  0  0 
h25(Area D)  Previous
Local Plan Greenlaw and Adjacent Land Area D  135  63  0  0 
2020PK1  Windfall  Windsor Square  12  0  0  0 
2022PK1  Windfall  Kentigern Mall  7  0  0  0 
Page 124 of 222

Page 125

Part 2 – Housing Land Pipeline 
Page 6 
Site Code Site Source  Site Name 
Short Term
2024/2025 -
2026/2027 
Medium Term
2027/2028 -
2029/2030 
Long Term
2030/2031 -
2033/2034 
Post 2034 
Small sites  Windfall    7  6  2  0 
Total      313  89  2  0 
Villages and rural remainder (Midlothian West HMA)    
Hs20  MLDP 2017  Auchendinny  168  170  57  0 
AHs1  MLDP 2017  Rosslynlee, near Penicuik  32  70  54  0 
AHs1(NP)  MLDP 2017  North Park (at Rosslynlee)  63  58  0  0 
AHs5  MLDP 2017  Wellington School, by Howgate  27  19  0  0 
2023VR1  Windfall  Barley Dean  3  2  0  0 
Small sites  Windfall    11  12  11  0 
Total      304  331  122  0 
Bonnyrigg   
Hs10(Area C)  MLDP 2017  Dalhousie Mains Area C  74  0  0  0 
Hs11(Area A)  MLDP 2017  Dalhousie South Area A  40  0  0  0 
Hs11(Area B)  MLDP 2017  Dalhousie South Area B  21  75  50  0 
Hs11(Area C)  MLDP 2017  Dalhousie South Area C  80  0  0  0 
Hs12 and Hs12 SC  MLDP 2017  Hopefield Farm 2 and Safeguarded Capacity  25  150  200  657 
243  Windfall  Former garage, Elm Row  3  2  0  0 
2021BL3  Windfall  Moorfoot Place  46  0  0  0 
2022BL1  Windfall  High Street  20  0  0  0 
Small sites  Windfall     3  5  2  0 
Total      312  232  252  657 
Dalkeith   
Hs2  MLDP 2017  Larkfield West  1  0  0  0 
Hs3  MLDP 2017  Larkfield South West  53  0  0  0 
2021DK1  Windfall  Buccleuch Street  4  0  0  0 
2023DK1  Windfall  Glenarch Lodge  0  6  0  0 
Page 125 of 222

Page 126

Part 2 – Housing Land Pipeline 
Page 7 
Site Code Site Source  Site Name 
Short Term
2024/2025 -
2026/2027 
Medium Term
2027/2028 -
2029/2030 
Long Term
2030/2031 -
2033/2034 
Post 2034 
Small sites  Windfall     6  5  3  0 
Total      64  11  3  0 
Gorebridge    
h50(1A)  Previous
Local Plan Redheugh / Prestonholm new community  0  140  240  320 
h24  Previous
Local Plan Newbyres  64  32  0  0 
h51  Previous
Local Plan Robertson's Bank  5  9  0  0 
2022GB1  Windfall  Newbyres Crescent  75  0  0  0 
Small sites  Windfall     1  2  3  0 
Total      145  183  243  320 
Mayfield and Newtongrange   
h48  Previous
Local Plan Bryans  48  0  0  0 
h41  Previous
Local Plan North Mayfield  99  55  0  0 
h38  Previous
Local Plan South Mayfield Sites  46  108  144  628 
2022MN1  Windfall  Former Newbattle High School (Phase 1)  90  0  0  0 
2022MN2  Windfall  Newtongrange Parish Church  5  0  0  0 
Small sites  Windfall     1  2  0  0 
Total      289  165  144  628 
Shawfair   
Hs0  MLDP 2017  Cauldcoats  13  120  231  66 
Hs1  MLDP 2017  Newton Farm  150  180  240  50 
Hs1 SC  MLDP 2017  Newton Farm, Safeguarded Capacity  0  48  112  200 
Page 126 of 222

Page 127

Part 2 – Housing Land Pipeline 
Page 8 
Site Code Site Source  Site Name 
Short Term
2024/2025 -
2026/2027 
Medium Term
2027/2028 -
2029/2030 
Long Term
2030/2031 -
2033/2034 
Post 2034 
h43(AandE)  Previous
Local Plan Shawfair (Blocks A and E)  20  84  80  0 
h43(B)  Previous
Local Plan Shawfair (Block B)  0  76  112  135 
h43(C)  Previous
Local Plan Shawfair (Block C)  0  0  48  135 
h43(F)  Previous
Local Plan Shawfair (Block F)  0  0  20  208 
h43(G)  Previous
Local Plan Shawfair (Block G)  0  0  0  67 
h43(H)  Previous
Local Plan Shawfair (Block H)  0  0  0  78 
h43(I)  Previous
Local Plan Shawfair (Block I)  0  0  0  144 
h43(K)  Previous
Local Plan Shawfair (Block K)  0  38  112  176 
h43(L)  Previous
Local Plan Shawfair (Block L)  0  76  112  47 
h43(P)  Previous
Local Plan Shawfair (Block P)  20  84  112  4 
h43(R1andR2)  Previous
Local Plan Shawfair (Blocks R1 and R2)  48  84  30  0 
h43(S4)  Previous
Local Plan Shawfair (Block S4)  23  0  0  0 
h43(S5)  Previous
Local Plan Shawfair (Block S5)  0  20  40  0 
h43(T2)  Previous
Local Plan Shawfair (Block T2)  108  90  50  0 
Page 127 of 222

Page 128

Part 2 – Housing Land Pipeline 
Page 9 
Site Code Site Source  Site Name 
Short Term
2024/2025 -
2026/2027 
Medium Term
2027/2028 -
2029/2030 
Long Term
2030/2031 -
2033/2034 
Post 2034 
h43(W1)  Previous
Local Plan Shawfair (Block Woolmet 1)  48  84  8  0 
h43(W2)  Previous
Local Plan Shawfair (Block Woolmet 2)  48  22  0  0 
h44 (Area A)  Previous
Local Plan North Danderhall  58  0  0  0 
h44 (Area B)  Previous
Local Plan North Danderhall (Area B)  28  0  0  0 
h44(AA2andAA3)  Previous
Local Plan North Danderhall (Blocks AA2 and AA3)  135  34  0  0 
2017 SA1  Windfall  Land South of Hilltown House  3  0  1  0 
2023SA1  Windfall  Newton Church Road  23  0  0  0 
Small sites  Windfall     2  2  1  0 
Total      727  1042  1309  1310 
Rosewell   
Hs14  MLDP 2017  Rosewell North  86  0  0  0 
h52andh22  Previous
Local Plan Gorton Loan and Rosewell Mains  10  0  0  0 
Small sites  Windfall     2  1  1  0 
Total      98  1  1  0 
Villages and rural remainder (Midlothian East HMA)   
h59  Previous
Local Plan Crichton Road, Pathhead  43  0  0  0 
2019VR2  Windfall  Airybank House  3  0  0  0 
2024 VR1  Windfall  Land 100M South West of Newlandburn
House 
0  10  0  0 
Small sites  Windfall     9  8  10  0 
Page 128 of 222

Page 129

Part 2 – Housing Land Pipeline 
Page 10 
Site Code Site Source  Site Name 
Short Term
2024/2025 -
2026/2027 
Medium Term
2027/2028 -
2029/2030 
Long Term
2030/2031 -
2033/2034 
Post 2034 
Total       55  18  10  0 
MIDLOTHIAN TOTAL      2512  2193  2163  2915 
Table 3: Local and Site-Specific Factors Inhibiting Delivery and Possible Solutions
Site Factor inhibiting delivery Possible solution
Hs5
Thornybank
North, Dalkeith
Reduced element of site remaining after
supermarket development
Consider prospects with site owner/promoter and determine
whether support for site is withdrawn.  This will be addressed as part
of MLDP2 preparation. 
Hs17
Pentland Plants,
by Bilston
No application  In the course of producing the Delivery Programme Engagement,
the site owner has re-affirmed their intention to develop the site for
housing. Consider prospects with site owner/promoter and
determine whether support for site continues.  This will be
addressed as part of MLDP2 preparation. 
Hs7 
Redheugh West
(Phase 2),
Gorebridge
Need for new bridge across Borders Railway Consider allowing commencement of limited part of development in
two sections either side of railway line with independent road
access, with active travel links on existing crossing of rail line.  Full
development of site would still be dependent on the new spine road
with railway crossing. If this was not considered achievable the site
allocation could be reduced, (or de-allocated completely).  Both of
these potential courses of action would be a matter for MLDP2.   
Ec3 (mixed use)
West Straiton
Scope of site and hence masterplan cannot be
defined until A701 relief road is consented. 
Consent A701 relief road, or reconsider transport and development
strategy for this corridor in MLDP2.  
Page 129 of 222

Page 130

Part 2 – Housing Land Pipeline 
Page 11 
Site Factor inhibiting delivery Possible solution
Allocation stated that housing could be part of
the development, but number not defined and no
education solution in place.   
AHs2
Burghlee,
Loanhead
Site constraints due to access and landscape In the course of Delivery Programme Engagement, the site promoter
has indicated continued interest and possible solutions to access
constraints. Consider prospects with site owner/promoter and
consider solutions, or whether support is withdrawn.  This will be
addressed as part of MLDP2 preparation. 
AHs3 
Belwood
Crescent,
Penicuik
No application – unsure if developer interest In the course of Delivery Programme Engagement, the MoD has
indicated that is surplus to requirements. Consider prospects with
site owner/promoter and consider whether site continues or whether
support is withdrawn.  This will be addressed as part of MLDP2
preparation.
AHs4
Pomathorn Mill,
Penicuik
Site constraints due to access and landscape Consider prospects with site owner/promoter and consider
solutions, or whether support for site is withdrawn.  This will be
addressed as part of MLDP2 preparation. 
Page 130 of 222

Page 131

Part 2 – Housing Land Pipeline 
Page 12 
Table 4 Consideration of constrained housing sites allocated in previous development plans (committed development).  
Site Factor inhibiting delivery Possible solution
h55 (remainder)
Seafield Moor
Road, Bilston
This is the remainder portion of a larger site,
alternative education use has emerged
Consider remaining land after provision for education needs, and
whether any continuing housing potential.  Matter for MLDP2.
h40
Vogrie Road (Site
W), Gorebridge
Change in ownership of developer after
completion of first two phases.
No clear planning solution, it is expected that in time the site owner
will seek to dispose of the site to another developer.   The current
site and settlement boundary appear rational.
h69 
Whitehill House,
by Rosewell
Challenges connected to conversion of historic
Category A listed building, linked to enabling
development at Site h70 to cross fund the
development.  
Continued dialogue with site promoters. 
h70 
Whitehill House,
by Rosewell
(Grounds)
Number of units permitted linked to required
enabling development to convert and restore
Whitehill House (h69).  Consented mix of units
may not fit well with product offered by volume
housebuilders.   
Continued dialogue with site promoters, also a matter for MLDP2 
Page 131 of 222

Page 132

Page 13 
Part 3 –
Economic Land
Economic Land 
13. Economic sites were allocated and identified in MLDP 2017 as part of the development strategy to
be delivered over the plan period.  Sites are not usually developed by a single developer or a single
use development on a one-off basis, but more commonly by a range of different sized developments
over time.  Take up of land is influenced by a range of external market and financial factors.  This
makes programming the release and development of economic sites in the same way as housing
land unrealistic.  Although the economic land supply seems large relative to historic take-up, from
engagement for MLDP2, the Council has evidence of very strong demand and need for available
economic units.  Economic sites are considered in detail in Tables 5 and 6, including the
infrastructure necessary to deliver them.  
14. The announcement of the Edinburgh and South East Scotland City Region Deal (ESESCRD) in
August 2018 seeks to deliver a programme of accelerated and inclusive growth across South East
Scotland. The Deal is an agreement between the UK Government, Scottish Government, the local
authorities of Edinburgh, Fife, Midlothian, Scottish Borders and West Lothian as well as the region's
universities and colleges. A commitment by the Deal partners to invest £1.3bn is anticipated to
generate over £5bn worth of Gross Value Added (GVA) over the next 15 years. In Midlothian, City
Deal will be a key driver in delivering new roads infrastructure to enable expansion and future
development of the University of Edinburgh's Easter Bush Campus (part of the ESESCRD Data
Driven Innovation Project) as well as a wider stimulus for additional development at the Midlothian
Science Zone. In tandem with City Deal investment, it is anticipated that the Council's economic
development strategy (“The Midlothian Strategy for Inclusive Economic Growth 2025-30") will
support and promote the development of allocated economic sites as well as regeneration and
redevelopment opportunities across the Council area. Progress will be monitored through the
annual Economic Land Audit (ELA) process and future Delivery Programmes. 
15. MLDP 2017 allocated approximately 122ha of economic land. This comprises 14.4ha of specialist
biotechnology developments at the Midlothian Science Zone, 48ha for a mix of class 4, 5 and 6 uses
and a specific allocation of 60ha of commercial/mixed use development at West Straiton - a
'Midlothian Gateway' development site. The annual ELA contains all the sites that constitute the
established economic land supply in Midlothian and measures the level of take-up (and/or loss to
alternative uses) of economic land each year. Changes to the economic land supply over the plan
period will be monitored by the ELA. Table 5 considers progress to date at these sites, and Table 6
considers committed sites from previous development plans. Table 9 considers the infrastructure
requirements of these sites.   
Page 132 of 222

Page 133

Part 3 – Economic Land 
Page 14 
Table 5: MLDP 2017 Strategic Economic Land Allocations
Site
reference Site name Gross site
area (ha)
Gross
remaining
land (ha)
Uses 2024 update, including consideration of
obstacles to development
Ec1 Shawfair Park
Extension
20.57 18.85 Business and industry No planning application submitted on the
extension area to date (occupied area is
historic building, viz nursery, Lowes Farm).   
The timing and phasing of Ec1’s development
will be subject to access arrangements being
agreed. The proposed grade separation of the
Sheriffhall Roundabout may allow new access
from the A6106.   
Ec2 Salter's Park Extension,
Dalkeith
16.9 16.9 Business and industry Planning permission in principle refused for
mixed use with large proportion of housing in
June 2018. 
Discussions with site promoter have identified
site constraints and high infrastructure costs. 
MLDP2 to consider future approach to site.   
Ec3 West Straiton 51.47 42.88 Mixed uses, principally
Commercial/
employment (but
housing could form part
of mix)
Pre-existing development on parts of the site
including concrete batching plant, park and
ride, restaurants.  Proposal of Application
Notice for a mixed use (although residential led)
development on part of the site. 
MDLP requires masterplan for site.  Midlothian
Council is not progressing this in advance of the
determination of the road line which defines the
western boundary of the site.  Road is to be
phased.  Updated design work (November
Page 133 of 222

Page 134

Part 3 – Economic Land 
Page 15 
Site
reference Site name Gross site
area (ha)
Gross
remaining
land (ha)
Uses 2024 update, including consideration of
obstacles to development
2023) undertaken by AMEY has produced a
preferred alignment and expenditure has been
authorised to take forward the design to
planning permission stage over the period
2023/2025 to 2025/2026. Need to resolve
alignment and delivery of A701 relief road to
determine future of site.   
Ec4 Ashgrove North,
Loanhead
15.7 14.4 Business and industry Some pre-existing take up within the site
boundary, need to have discussions with site
promoter to understand reasons for no take up
at this and adjoining site e34.   
Ec5 Oatslie, Roslin 4.7 4.7 Business and industry Site needs utility connections.  Discussion has
been had with site promoter to understand
reasons for no take up at this and adjoining site
e34. To be considered in production of
Midlothian Local Development Plan 2. 
Bt1 Easter Bush North 5.8 5.6 Biotechnology uses Little take up at site.  In common with other
MSZ sites, connection with Bush Loan to A702
is major constraint, as well as drainage and
electricity supply issues.   
Bt2 Easter Bush South 5.8 2.5 Biotechnology uses No take up at site.  In common with other MSZ
sites, connection with Bush Loan to A702 is
major constraint, as well as drainage and
electricity supply issues.   
Page 134 of 222

Page 135

Part 3 – Economic Land 
Page 16 
Site
reference Site name Gross site
area (ha)
Gross
remaining
land (ha)
Uses 2024 update, including consideration of
obstacles to development
Bt3 Technopole North West 2.2 2.2 Biotechnology uses No take up at site.  In common with other MSZ
sites, connection with Bush Loan to A702 is
major constraint, as well as drainage and
electricity supply issues.   
Note: in addition to its sites at the MSZ, University of Edinburgh manages a 50 ha holding at Langhill Farm which is integrated with MSZ operations
through provision of teaching opportunities and husbandry of livestock, as well as delivery of feedstock and other products for the operation of the
Easter Bush facility. 
Table 6 Progress on economic land committed in previous development plans (completed economic sites not listed)
Site
reference Site name Gross site
area (ha)
Gross
remaining
land (ha)
Uses 2025 update, including consideration of
obstacles to development
e16 Bonnyrigg Hopefield 4.93 4.93 Business uses Stalled site.  Site infrastructure provided and
site is immediately available, appears to be lack
of capital to build units speculatively or lack of
single user willing to develop site.  
e15 Bonnyrigg, Sherwood
Industrial Estate
7.87 1.04 Business and industry Some vacant land in association with existing
businesses.
e13 Grannies Park,
Dalkeith
1.91 0.83 Business uses Vacant backlands, gives room for expansion for
existing users.
e11 Hardengreen 9.05 1.44 Business and industry Remaining area to south of station car park,
consideration of most sustainable and gainful
use of this site adjacent to Eskbank railway
station required in LDP2.  
e14 Salter’s Park, 
Dalkeith
17.8 17.8 Business, industry, and
storage and distribution
Stalled site.  Discussions with site promoter
have identified site constraints and high
infrastructure costs.  MLDP2 to consider future
approach to site (also at Ec2).   
Page 135 of 222

Page 136

Part 3 – Economic Land 
Page 17 
Site
reference Site name Gross site
area (ha)
Gross
remaining
land (ha)
Uses 2025 update, including consideration of
obstacles to development
e32 Sheriffhall South 18.39 16.3 Business uses Detailed application for parts of the sites
approved, does not appear to be stalled.
e22 Redheugh 9.77 9.77 Business and industry Stalled site appears to need sufficient anchor
tenants in place before can be opened up. 
Land acquired by current owner from British
Coal, so likely ground condition issues.  Up-
front costs of providing link road through site
appear to have deterred development.  
Alternative mixed use for the site (including
retailing and housing) submitted for LDP Call for
Ideas.
e7 Straiton 1.94 1.24 Business uses Stalled site, MLDP2 to consider future uses of
site.
e33 Ashgrove,
Loanhead
5.71 5.32 Business and storage
and distribution
Stalled site, MLDP2 to consider future uses of
site
e5 Edgefield Industrial
Estate
7.98 1.45 Business and industry Some vacant land gives scope to expand
businesses, demolition of grain silos has
increased vacant land at this site.  
e17 Mayfield Industrial
Estate
23.83 2.41 Business and industry Largely complete, small part of site remains.
e3 Bilston Glen 26.43 0.37 Business and industry One vacant plot remaining on site.  
e20 Lady Victoria Business
Centre, Newtongrange
8.39 1.46 Business and industry Largely complete, small area intermittently used
for storage.  
e21 Stobhill Road,
Newtongrange
8.69 5.86 Business and industry Earlier Stobhill and Lady Vic masterplans
supported housing on site (non-planning
documents).  MLDP2 to consider future uses of
site.
e19 Butlerfield Industrial
Estate
8.71 0.35 Business and industry One plot vacant remaining on site
Page 136 of 222

Page 137

Part 3 – Economic Land 
Page 18 
Site
reference Site name Gross site
area (ha)
Gross
remaining
land (ha)
Uses 2025 update, including consideration of
obstacles to development
e1 Eastfield Industrial
Estate
6.4 0.13 Business and industry Largely complete
e24 Gorton Road, Rosewell 1.84 1.31 Business and industry Stalled site, once development work complete
and construction compound removed, site will
be wholly vacant.  MLDP2 to consider future of
site, including rectifying mapping error on
proposals map.
e34 Oatslie, Roslin 5.62 5.62 Business uses Stalled site, MLDP2 to consider future of site
e26 Whitehill Mains,
Shawfair
18.73 18.54 Business and industry Recent planning activity suggests that progress
on site may be imminent.  
e27 Shawfair Park 36.75 19.31 Business and industry Steady take up on site, around half site now
taken up.  
e25 Millerhill /Monktonhall 69.57 34.8 Business, industry, and
storage and distribution
and other uses (waste
management)
Steady take up, large area occupied by waste
and rail uses.
e30 Polton House,
Bonnyrigg
1.48 0.27 General industrial Largely complete, some vacant land allows for
expansion of businesses on site.  
e31 Eldin, Loanhead 4.99 1.00 General industrial Largely complete, some vacant land allows for
expansion of businesses on site.  
b2 Edinburgh Technopole 50.05 7.65 Research and
Development
Largely complete, although infrastructure likely
to be a constraint (particularly A702 access) to
completing site.
b3 Gowkley Moss 15.44 4.82 Research and
Development (and
related manufacturing)
Largely complete, although infrastructure likely
to be a constraint (particularly A702 access) to
completing site.
b6 Easter Bush 9.04 6.95 Knowledge Based
Industry and Related
Manufacturing 
Ongoing interest, although in common with
other MSZ sites, infrastructure is a constraint
here (particularly A702 access).
Page 137 of 222

Page 138

Part 3 – Economic Land 
Page 19 
Site
reference Site name Gross site
area (ha)
Gross
remaining
land (ha)
Uses 2025 update, including consideration of
obstacles to development
b7 Gowkley Moss North 10.49 10.49 Knowledge Based
Industry and Related
Manufacturing 
Stalled.  In common with other MSZ sites,
infrastructure is a constraint here (particularly
A702 access).
b8 Gowkley Moss South 2.14 2.14 Knowledge Based
Industry and Related
Manufacturing
Stalled.  In common with other MSZ sites,
infrastructure is a constraint here (particularly
A702 access).
b9 New Milton 10.13 10.13 Knowledge Based
Industry and Related
Manufacturing 
Site provides for expansion of an existing user
(Moredun Foundation) although in common
with other MSZ sites, infrastructure is a
constraint here (particularly A702 access).
Page 138 of 222

Page 139

Page 20 
Part 4 –
Infrastructure Delivery 
Infrastructure Delivery 
16. This section of the Delivery Programme reviews infrastructure completed since adoption of MLDP
2017 and sets out further actions in respect of, education, health, transport, waste, water and
drainage and any other miscellaneous actions required to deliver the LDP.   
Page 139 of 222

Page 140

Part 4 – Infrastructure Delivery 
Page 21 
Table 7: Completed Infrastructure Actions from MLDP 2017
Infrastructure Description Year of opening
Education
Replacement Roslin Primary School  New 2017
Replacement Paradykes Primary School  New 2017
Replacement Newbattle High School  New 2018
Additional classroom capacity at Lasswade Primary School Extension 2018
Refurbishment to increase early learning and childcare capacity at Lasswade Primary School Upgrade 2018
Additional early learning and childcare capacity and additional classrooms at Burnbrae Primary
School
Extension 2018
Additional early learning and childcare capacity at Danderhall Primary School Extension 2018
Additional early learning and childcare capacity at Mayfield Nursery School Extension 2018
Reprovisioning of rooms to increase Complex Needs Provision at St David's RC High School Upgrade 2018
Additional classroom capacity at St David's RC Primary School Extension 2019
Creation of Outdoor Early Learning and Outdoor Setting at Vogrie Country Park Upgrade 2019
Refurbishment of spaces to make an additional classroom available at Woodburn Primary School Upgrade 2019
Reprovisioning of rooms to increase Complex Needs Provision at St David's RC High School Upgrade 2018
Additional capacity at Cuiken Primary School  Extension 2020
Additional classrooms and early learning and childcare capacity at Sacred Heart RC Primary
School
Extension 2020
Replacement St Mary's RC Primary School with increased capacity and early learning/childcare
capacity at Burnbrae Primary School
New 2020
Replacement Danderhall Primary School New 2021
Additional Capacity at King’s Park PS, Dalkeith via temporary accommodation Extension 2023
Additional Capacity at Rosewell PS, Rosewell via temporary accommodation Extension 2023/2024
Additional Capacity at Roslin PS, Roslin via temporary accommodation Extension 2023/2024
Easthouses Primary School New 2024/2025
Woodburn Primary School Extension 2024
Transport
Mauricewood roundabout on A702 trunk road New 2018
A7/The Wisp junction Upgrade 2023
North West Penicuik Link New TBD
Page 140 of 222

Page 141

Part 4 – Infrastructure Delivery 
Page 22 
Infrastructure Description Year of opening
Waste  
Anaerobic digestion plant at Millerhill to recover energy content of food waste New 2017
Recycling and Energy Recovery Centre at Millerhill to handle residual waste streams sustainably New 2019
Water and Drainage infrastructure delivery   
Scottish Water have undertaken three strategic network impact assessments and incorporated
the developments contained within the 2017 MLDP. These assessments cover the vast majority
of the water and wastewater networks within the Midlothian area.  Scottish Water will plan,
prepare and deliver the necessary solutions to reinforce our network just ahead of need. 
Strategic network
wastewater and water
impact modelling.
Modelling
assessments
completed.
Strategic
network
reinforcement
will be delivered
just ahead of
need 
Table 8: Future Infrastructure Provision
Infrastructure provision Description Estimated Completion
Education
Formation of new Mayfield Schools Campus to replace to replace Mayfield
Nursery School, Mayfield Primary School and St Luke's RC Primary School (note
– this project is not related to new development)
New 2025
Newbattle High School Extension TBD
Replacement Beeslack Secondary School on new site near Bilston New Estimated completion
2027
Additional secondary school capacity to serve Shawfair SDA. New 2027/2028
Additional new primary school capacity to serve Shawfair New 2027/2028
Secondary ASN Unit at Former Mount Esk Nursery as part of Lasswade HS Extension 2024/2025
Bonnyrigg Site Hs12 New Primary School New (subject to review) TBD – subject to review
Gorebridge High School (commitment to undertake a land identification
study to provide an analysis of possible sites for a school – study underway)
Land identification study A site can be safeguarded
in MLDP2
Page 141 of 222

Page 142

Part 4 – Infrastructure Delivery 
Page 23 
Infrastructure provision Description Estimated Completion
Redheugh PS Gorebridge – identified in Midlothian Local Plan (2008), MLDP
(2017). LES 2022 indicates this is a project in planning, linked to progress at
housing site.  
New TBD – linked to phasing of
h50 and Hs7
Bilston Primary School expansion Extension 2025
Mauricewood Primary School expansion Extension 2026/2027
Transport
A720 Sheriffhall Junction Grade Separation Grade separated junction
on the A720 City of
Edinburgh bypass.
Awaiting Scottish
Ministers decision. 
Midlothian Council has
collected developer
contributions towards this
project.  
Realignment of The Wisp - site access.  TBD
Link road between A720/A68 junction and
B6415/Old Craighall Road.
New link road. Part of consented
development for Hs1
(ref.17/00408/DPP). 
Phasing of development
and link road subject to
planning condition 1.
Millerhill Park and Ride (A68 north). New park and ride facility. TBD
Linked to Edinburgh
Orbital Bus project.
A7 safety, active travel and public transport service improvements. Infrastructure and bus
service improvements.
After 2027. 
A701 relief road/link to A702 New roads, junctions and
active travel infrastructure.
Project to be phased, with
elements supporting the
Midlothian Science Zone
given priority.  It is
expected that the
planning application of the
A702/ Bush Loan element
of the project will be
Page 142 of 222

Page 143

Part 4 – Infrastructure Delivery 
Page 24 
Infrastructure provision Description Estimated Completion
considered in early 2025. 
Subject to approval,
completion is anticipated
by the end of 2026.  The
main phase (the A701
relief road and A702 spur
road) is scheduled for
delivery in 2028. A
preferred alignment was
prepared in November
2023. The programme for
the road is to take it
forward to planning
permission stage over the
period 2023/24 to
2025/2026. This project
also involves creation of
an A701 Sustainable
Transport Corridor.
Road/junction improvements at Pomathorn Road
(B6372). 
Linked to implementation
of site AHs4
Junction improvements at A701/access road to
Wellington school. 
Linked to implementation
of site AHs5 (ref.
20/00144/DPP and PPA-
290-2060).
Potential junction improvements at Straiton/A720 and the A702.  Initial discussions for
Straiton Junction
improvements have taken
place with Transport
Scotland. 
Page 143 of 222

Page 144

Part 4 – Infrastructure Delivery 
Page 25 
Infrastructure provision Description Estimated Completion
B6482 Bryans Road to Gowkshill Link Earlier requirement in
development plan was for
re-aligned road linked to
development area.  The
approved scheme (ref.
22/00027/PPP) does not
include a re-aligned road
proposal, but upgrade to
existing Crawlees Road
included in proposed phase
1 development.
Linked to site h38
implementation 
South Mayfield Distributor New road, linked to
development area from
2003 MLP.  Included in the
approved scheme (ref.
22/00027/PPP) as a ‘Link
Road/ Primary Street
connecting Bogwood Road
and Crawlees Road. Road
to be completed in entirety
prior to occupation of phase
6 of the development).
Linked to site h38
implementation (ref.
22/00027/PPP)
A702/ Bush Loan New junction, realignment
of approach roads
Included as part of wider
A701 realignment, this
element which supports
Midlothian Science Zone
given priority. It is
expected that the
planning application will
be considered in early
2025.  Subject to
approval, completion is
Page 144 of 222

Page 145

Part 4 – Infrastructure Delivery 
Page 26 
Infrastructure provision Description Estimated Completion
anticipated by the end of
2026.
A702/ A703 Damhead Junction redesign. These works are being
led by Transport Scotland
Road Safety and are
ongoing.
A701/ Graham's Road/ Belwood Road Improved signals TBD
Lothian Street/ High Street, Bonnyrigg Improved signals and
investigate improved
junction design/layout
TBD
The Wisp/ Millerhill Road Improved junction, likely to
involve signal control
TBD
Sheriffhall park and ride (extension) Park and ride extension. TBD
Lothianburn park and ride New park and ride facility. TBD 
Orbital Bus Route (A720 City Bypass) New bus priority measures
and bus routes.
Longer Term, Transport
Scotland Strategic
Transport Project Review
(STPR) 2 indicates this
amongst the supported
projects.  
Shawfair Infrastructure  Ongoing in tandem with
development
Supported bus services in connection with new development  Ongoing in tandem with
development
Potential rail station at Redheugh  A business case has not
been produced to show a
new rail halt is financially
viable or deliverable at this
location. 
Page 145 of 222

Page 146

Part 4 – Infrastructure Delivery 
Page 27 
Infrastructure provision Description Estimated Completion
An additional rail halt may
not be deliverable, in
which case developer
contributions would be
used for alternative
transport solutions.  
Tramline 3 to Dalkeith New tram routes. Longer Term, STPR 2
includes mass transit for
South East Scotland as
one of the supported
projects. Emerging tram
route proposals
highlighted in Edinburgh
City Mobility Plan.
Millerhill-Loanhead rail safeguard  Majority of route re-
purposed for active travel. 
Planning (Scotland) Act
2019 requires the review
of disused railway
infrastructure as part of
LDP production. A review
of this important route will
be undertaken as part of
the replacement of MLDP
2017 – MLDP2.
Infrastructure improvements to complement Borders Rail Active travel infrastructure
improvements
Ongoing in tandem with
residential development
Open Space and Green Infrastructure
Outdoor Play Equipment – Rosewell New Play Equipment 2024
Roslin Wheeled Sports Facility New Wheeled Sports
Facility
2024
Millerhill Park Asphalt/Circular Path New Path 2024
Page 146 of 222

Page 147

Part 4 – Infrastructure Delivery 
Page 28 
Infrastructure provision Description Estimated Completion
Birkenside Play Equipment New Play Equipment 2024
Welfare Park, Newtongrange Open Space Upgrades 2024
Waste
By 2025, provision of a fully commissioned low carbon district heating network to
Shawfair Town, capable of expansion into a regional network. 
New Expected 2025
Water and Drainage  
Gorebridge Waste Water Treatment Works (WwTW) Growth project, expansion
of existing facility to
accommodate demand
from committed
development.
Scottish Water expect to
deliver enhancements just
ahead of need.  They will
work closely with
developers to understand
their plans and support
connection to the network
(this could involve
providing an interim
solution while projects are
ongoing). 
Rosewell WwTW  Growth project, expansion
of existing facility to
accommodate demand
from committed
development.
Scottish Water expect to
deliver enhancements just
ahead of need.  They will
work closely with
developers to understand
their plans and support
connection to the network
(this could involve
providing an interim
solution while projects are
ongoing).
Roslin WwTW Growth project, expansion
of existing facility to
Scottish Water expect to
deliver enhancements just
Page 147 of 222

Page 148

Part 4 – Infrastructure Delivery 
Page 29 
Infrastructure provision Description Estimated Completion
accommodate demand
from committed
development.
ahead of need.  They will
work closely with
developers to understand
their plans and support
connection to the network
(this could involve
providing an interim
solution while projects are
ongoing). 
Penicuik WwTW Growth project, expansion
of existing facility to
accommodate demand
from committed
development.
Scottish Water expect to
deliver enhancements just
ahead of need.  They will
work closely with
developers to understand
their plans and support
connection to the network
(this could involve
providing an interim
solution while projects are
ongoing). 
Edinburgh and Lothians Strategic Drainage project Series of actions across
Seafield WwTW catchment
intended to lower load on
Seafield by treating surface
water in more sustainable
manner 
Ongoing, not expressly
linked to any development
site, but to assist in
providing capacity for
committed and future
development in city
region.   
Page 148 of 222

Page 149

Page 30 
Part 5 –
Site Specific Actions
Site Specific Actions 
17. This section identifies, for each allocated site, the actions necessary to deliver the site, including
infrastructure and other requirements. In the first instance these are drawn from MLDP 2017 and
are set out in the plan’s settlement statements and the Implementation policies.  Policies IMP1 (New
Development), IMP2 (Essential Infrastructure Required to Enable New Development to Take Place),
IMP3 (Water and Drainage), NRG6 (Community Heating), TRAN2 (Transport Network Interventions)
provide the policy basis for the requirements.  In some cases, the infrastructure requirements are
different now from what was expected when MLDP 2017 was adopted.  This is particularly the case
in education and in relation to updated Learning Estate Strategy documents. 
Page 149 of 222

Page 150

Part 5 – Site Specific Actions 
Page 31 
Table 9: Site Specific Actions Required to Deliver Sites (Housing and Economic)
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
Hs0
Cauldcoats 
(consented,
PPP)
Additional
secondary school
capacity. 
Additional new
primary school
capacity 
Sport/ recreation
and community
facilities. 
Prior rehabilitation/
decontamination
of Niddrie Bing -
ground
engineering/
stabilisation. 
Structural
landscape/
framework to
establish
community
identity. 
Green network
links.
Realignment of
The Wisp - site
access. 
Grade separation
of Sheriffhall
Roundabout. 
(Borders Rail and
The Wisp/A7
junction
improvements
already carried
out)
Water and drainage
infrastructure as
required. 
Flood Risk
Assessment (FRA)
was carried out for
application
14/00910/PPP
Developer
(approved in July
2019).
Implement
district heating/
combined heat
and power
proposal 
Developers in
the Shawfair
area may be
required
to contribute to
this project, as
set out in Policy
IMP2.
Hs1
Newton Farm 
(Under
construction)
Additional
secondary school
capacity. 
Additional new
primary school
capacity
Sport/recreation
and community
facilities. 
Landscaping. 
Green network
planting/footpath/c
ycleway. 
Allotments/
community food
production space.
Link road between
A720/A68 junction
and
B6415/Old
Craighall Road. 
Connection
between link road
and phase 2
safeguarded site. 
Park and Ride site. 
Grade 
Water and drainage
infrastructure as
required. Special
provisions required
to protect or re-route
combined sewer
Newton Farm Hs1
(480)
pipe crossing site
from east to west -
subject to layout. 
Flood Risk
Assessment (FRA)
Implement
district heating/
combined heat
and power
proposal 
Developers in
the Shawfair
area may be
required
to contribute to
this project, as
set out in Policy
IMP2.
Page 150 of 222

Page 151

Part 5 – Site Specific Actions 
Page 32 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
separation of
Sheriffhall
Roundabout. 
Access and
junction
improvements,
including
footpaths and
cycleways.
and drainage
strategy work has
been carried out in
association with
application
17/00408/DPP. 
Hs2
Larkfield
West 
(under
construction)
Additional primary
school provision. 
Additional
secondary school
capacity   
Structural
landscape.
Strategic green
space/green
network links.
Access and
junction
improvements,
including
footpaths and
cycleways. 
A7 safety, active
travel and public
transport service
improvements.
Water
and drainage
infrastructure to be
provided as required. 
Hs3
Larkfield
South West   
(under
construction)
Additional primary
school provision 
Additional
secondary school
capacity 
Structural
landscape. 
Strategic green
space/green
network links.
Access and
junction
improvements,
including
footpaths and
cycleways. 
A7 safety, active
travel and public
transport service
This development
has commenced
construction, water
and drainage
infrastructure to be
provided as required. 
Page 151 of 222

Page 152

Part 5 – Site Specific Actions 
Page 33 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
improvements.
Hs5
Thornybank
North,
Dalkeith   
(constrained
site)  
Additional primary
school provision 
Additional
secondary school
capacity 
Structural
landscape. 
Strategic green
space/green
network links.
Access and
junction
improvements,
including
footpaths and
cycleways.
Water and drainage
infrastructure as
required. 
Hs7
Redheugh
West (Phase
2),
Gorebridge
Additional
secondary school
capacity required. 
Additional primary
school capacity
requirement,
potentially in form
of new primary
school
Land required to
be safeguard land
for community use
(may include
health facility)
Structural
landscape.
(phase 2), 
Gorebridge
Strategic green
space/green
network links. 
Allotments/commu
nity food
production space.
Access and
junction
improvements,
including
footpaths and
cycleways. 
MLDP 2017 refers
to a potential
Redheugh station. 
For technical
reasons this is not
likely to be
deliverable.  
Water and drainage
infrastructure as
required. Scottish
Water has identified
a need for further
growth investment
in the 2021-27
regulatory period at
the wastewater
treatment works
serving Gorebridge.
Drainage Impact
Assessment required
to assess impact on
network. Early
discussions with SW
recommended. 
Flood Risk
Assessment (FRA)
required and
masterplan should
consider treatment 
Page 152 of 222

Page 153

Part 5 – Site Specific Actions 
Page 34 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
of buffer strips along
water courses.
Hs10
Dalhousie
Mains,
Bonnyrigg   
(under
construction)
Site supported by
completed
expansion of
Burnbrae PS, St
Mary’s PS, and
enhancement to
Lasswade HS.  
Note in
preparation of
Evidence Report
for MLDP2, urgent
need for
replacement
Primary Care
facilities at South
Bonnyrigg/Rosewe
ll was identified by
Midlothian Health
and Social Care
Partnership and
NHS Lothian.
Structural
landscape. 
Strategic green
space/green
network links.
Access and
junction
improvements,
including
footpaths and
cycleways. 
A7 safety, active
travel and public
transport service
improvements. 
Water and drainage
infrastructure as
required. 
Hs11
Dalhousie
South,
Bonnyrigg 
(under
construction)
Site supported by
completed
expansion of
Burnbrae PS, St
Mary’s PS, and
enhancement to
Lasswade HS.  
Note in
preparation of
Evidence Report
for MLDP2, urgent
need for
replacement
Primary Care
facilities at South
Bonnyrigg/Rosewe
ll was identified by
Midlothian Health
and Social Care
Partnership and
NHS Lothian.
Structural
landscape. 
Strategic green
space/green
network links.
Access and
junction
improvements,
including
footpaths and
cycleways.
A7 safety, active
travel and public
transport service
improvements. 
(Borders Rail
already carried
out)
Water and drainage
infrastructure as
required. There is
a 300mm water main
located to the south-
west of the
site. There is also a
combined sewer
overflow pipe located
to the north-east of
the site. 
Page 153 of 222

Page 154

Part 5 – Site Specific Actions 
Page 35 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
Hs12 
Hopefield
Farm 2,
Bonnyrigg 
(minded to
consent)
Additional Primary
School capacity
required.  
Note in
preparation of
Evidence Report
for MLDP2, urgent
need for
replacement
Primary Care
facilities at South
Bonnyrigg/Rosewe
ll was identified by
Midlothian Health
and Social Care
Partnership and
NHS Lothian.
Structural
landscape. 
Strategic green
space/green
network links. 
Allotments/commu
nity food
production space.
Access and
junction
improvements,
including
footpaths and
cycleways.
A7 safety, active
travel and public
transport service
improvements. 
(Borders Rail
already carried
out)
Water and drainage
infrastructure as
required. There is
a 10" water main
located along the
path traversing the
site, contact with
Scottish Water
recommended. 
Hs14  
Rosewell
North,
Rosewell 
(under
construction)
Additional primary
school capacity
required 
Additional
secondary
capacity required 
Note in
preparation of
Evidence Report
for MLDP2, urgent
need for
replacement
Primary Care
facilities at South
Bonnyrigg/Rosewe
ll was identified by
Midlothian Health
and Social Care
Partnership and
NHS Lothian.
Structural
landscape. 
Strategic green
space/green
network links.
Access and
junction
improvements,
including
footpaths and
cycleways. 
(Borders Rail
already carried
out)
Water and drainage
infrastructure as
required. Scottish
Water has identified
a need for additional
capacity at the
wastewater
treatment works
serving Rosewell,
and
this project is
proceeding through
the Scottish Water
investment
process. There is a
300mm water main
located in the north 
Page 154 of 222

Page 155

Part 5 – Site Specific Actions 
Page 36 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
east corner of the
site.  
Hs16
Seafield
Road, Bilston 
(Council is
minded to
consent
subject to
legal
agreement
for a final
phase)  
Additional primary
school capacity
required - Bilston
Primary School
expansion 
Additional
secondary school
capacity required -
Beeslack High
School
replacement 
Site to contribute
to new community
facility that may be
part of the new
Primary School.   
Structural
landscape.
Bilston
Strategic green
space/green
network links. 
Allotments/commu
nity food
production space.
A701 relief
road/link to A702
Bilston. 
Access and
junction
improvements,
including
footpaths and
cycleways.
Water and drainage
infrastructure as
required. 
Water and
Drainage Impact
Assessments may be
required to assess
impact of
development on
network. 
Flood Risk
Assessment (FRA)
will be required. The
site should be
developed with
enhanced SUDS and
a buffer strip to the
watercourse. 
Hs17
Pentland
Plants, by
Bilston 
Additional primary
school capacity
required - Bilston
Primary School
expansion 
Additional
secondary school
capacity required -
Site to contribute
to new community
facility that may be
part of the new
Primary School.  
Structural
landscape. 
Strategic green
space/green
network links.
A701 relief
road/link to A702
Bilston
Access and
junction
improvements,
including
footpaths and
cycleways.
Water and drainage
infrastructure as
required. Water and
Drainage Impact
Assessments may be
required to assess
impact of
development on
network. 
Page 155 of 222

Page 156

Part 5 – Site Specific Actions 
Page 37 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
Beeslack High
School
replacement 
Hs18
Roslin
Institute,
Roslin
Additional primary
school capacity
required 
Additional
secondary school
capacity required -
Beeslack High
School
replacement
Possible extension
to Roslin Pavilion.
Structural
landscape. 
Strategic green
space/green
network links.
A701 relief
road/link to A702
Bilston
Access and
junction
improvements,
including
footpaths and
cycleways.
Water and drainage
infrastructure as
required. Scottish
Water has identified
a need for further
growth investment in
the 2021-27
regulatory period at
the wastewater
treatment works
serving Roslin. There
is a wastewater
pumping station
located to the south-
east of the site with
an additional
pumping station
located toward the
centre
of the site with
additional pipework. 
Hs19
Roslin
expansion,
Roslin
Additional primary
school capacity
required 
Additional
secondary school
capacity required -
Possible extension
to Roslin Pavilion.
Structural
landscape. 
Strategic green
space/green
network links.
A701 relief
road/link to A702
Bilston
Access and
junction
improvements,
including
Water and drainage
infrastructure as
required. Scottish
Water has identified
a need for further
growth investment in
the 2021-27 
Page 156 of 222

Page 157

Part 5 – Site Specific Actions 
Page 38 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
Beeslack High
School
replacement
footpaths and
cycleways.
regulatory period at
the wastewater
treatment works
serving Roslin. There
are two 300mm
foul and surface
water pipes located
onsite
Hs20
Auchendinny
Additional primary
school capacity
required -
Mauricewood
Primary School
expansion 
Additional
secondary school
capacity required -
Beeslack High
School
replacement
Community/leisure
facility, as part of
new primary
school.  It is now
intended to deliver
the primary
capacity at
Mauricewood.  
Structural
landscape. 
Strategic green
space/green
network links.
A701 relief
road/link to A702.
Water and drainage
infrastructure as
required. Capacity
issues at sewage
pumping station.
Drainage Impact
Assessment required
to assess impact on
both pump
stations and identify
mitigation measures
which may
require increasing
the capacity of the
pumping station.
There is a 90mm
water main located
along the Firth Road.
Early contact with
Scottish Water
recommended. 
Page 157 of 222

Page 158

Part 5 – Site Specific Actions 
Page 39 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
Flood Risk
Assessment (FRA)
will be required.
AHs1
Rosslynlee,
by Rosewell
Contribution to
additional primary
and secondary
school capacity
Contribution to
community
facilities
Structure
landscaping and
open space and
new green
network links
Contribution to
Borders Rail.   
Access and
junction
improvements,
including for active
travel
Water and drainage
infrastructure as
required. 
AHs2
Burghlee,
Loanhead
Contribution to
additional primary
and secondary
school capacity 
Environmental
improvements to
Burghlee Park. 
Structure
landscaping and
open space
A701 relief road
and A702 link.   
Access and
junction
improvements,
including for active
travel
Water and drainage
infrastructure as
required. 
AHs3
Belwood
Crescent,
Penicuik
Contribution to
additional primary
and secondary
school capacity 
Structure
landscaping and
open space
A701 relief road
and A702 link.   
Water and drainage
infrastructure as
required. 
AHs4
Pomathorn
Mill, Penicuik
Contribution to
additional primary
and secondary
school capacity 
Structure
landscaping and
open space
A701 relief road
and A702 link. 
Road junction
improvements at
Pomathorn Road
(B6372) 
Water and drainage
infrastructure as
required. 
Page 158 of 222

Page 159

Part 5 – Site Specific Actions 
Page 40 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
AHs5
Wellington
School, by
Howgate
Contribution to
additional primary
and secondary
school capacity 
Structure
landscaping and
open space
A701 relief road
and A702 link. 
Improvements to
form acceptable
access from site to
A701 
Water and drainage
infrastructure as
required. 
h22 Rosewell
Mains and
h52 Gorton
Loan,
Roswell 
Contribution to
additional primary
and secondary
school capacity
Contribution to
community
facilities
Structure
landscaping and
open space and
new green
network links
Junction
Improvement
A6094/ B7003
Gorton Road 
Site h52
contributes to
Borders Rail.   
Access and
junction
improvements,
including for active
travel
Water and drainage
infrastructure as
required. 
h24
Newbyres,
Gorebridge
Contribution to
additional primary
and secondary
school capacity. 
Contribution to
community hub
and town centre
improvements
Structure
landscaping and
open space,
contribution to
new green
network links
Access and
junction
improvements,
including for active
travel
Water and drainage
infrastructure as
required. 
h25
Greenlaw,
Penicuik
Contribution to
additional primary 
Structure
landscaping and
open space and
Upgraded junction
at
A702/Mauricewoo
Water and drainage
infrastructure as
required. 
Page 159 of 222

Page 160

Part 5 – Site Specific Actions 
Page 41 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
and secondary
school capacity
new green
network links
d Road (new
roundabout) 
Upgrade junction
A701/
Mauricewood
Road 
h34 
East
Newtongrang
e
Contribution to
additional
secondary school
capacity. 
Additional primary
school capacity  
Leisure and
community
facilities
Structure
landscaping and
open space
Access and
junction
improvements,
local road
improvements 
Water and drainage
infrastructure as
required. 
h35
Lingerwood 
Contribution to
additional
secondary school
capacity. 
Additional primary
school capacity  
Leisure and
community
facilities
Structure
landscaping and
open space
Access and
junction
improvements,
local road
improvements 
Water and drainage
infrastructure as
required. 
h38 
South
Mayfield
Contribution to
additional
secondary school
capacity. 
Additional primary
school capacity  
Contribution to
improved library
provision and
community leisure
facility (delivered
at Newbattle HS)
Structure
landscaping and
open space, new
green network
links
Local road
improvement 
Active travel
improvements 
Water and drainage
infrastructure as
required. 
h40 
Vogrie Road,
Gorebridge
Contribution to
additional primary
Contribution to
community hub
Structure
landscaping and
open space
Improvements to
Lady Brae
Water and drainage
infrastructure as
required. 
Page 160 of 222

Page 161

Part 5 – Site Specific Actions 
Page 42 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
and secondary
school capacity. 
and town centre
improvements 
h41 
North
Mayfield
Contribution to
additional
secondary school
capacity. 
Additional primary
school capacity  
Improvements to
Mayfield Town
Centre
Structure
landscaping and
open space
Active travel
improvements 
Water and drainage
infrastructure as
required. 
h43
Shawfair,
h44 North
Danderhall 
and h45
South
Danderhall
Additional
secondary school
capacity. 
Additional primary
school capacity  
Shawfair Town
Centre (including
community
facilities) 
Sport, recreation
and community
facilities 
Community
woodland,
structural
landscaping and
Shawfair open
space
Sheriffhall Junction
upgrade 
Borders Rail
including
(Shawfair station)
– delivered.   
Water and drainage
infrastructure as
required. 
Shawfair SUDS
system 
District Heating,
Combined Heat
and Power
h48
Bryans,
Easthouses
Contribution to
additional
secondary school
capacity. 
Additional  primary
school capacity  
Improvements to
Mayfield Town
Centre
Structure
landscaping and
open space
Contribution to
Borders Rail 
Active travel
improvements 
Water and drainage
infrastructure as
required. 
h49 
Dykeneuk,
Mayfield
Contribution to
additional
secondary school
capacity. 
Improvements to
Mayfield Town
Centre
Structure
landscaping and
open space
Contribution to
Borders Rail 
Local road
improvements 
Water and drainage
infrastructure as
required. 
Page 161 of 222

Page 162

Part 5 – Site Specific Actions 
Page 43 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
Additional primary
school capacity    Active travel
improvements 
h50
Redheugh,
Gorebridge
New Primary
School and
contribution to
secondary school
capacity. 
Structure
landscaping and
open space,
allotments and
space for
community food
growing 
Contribution to
Borders Rail,
including potential
Redheugh Station.
Note no Business
Case has been
prepared for new
station.   
Access and
junction
improvements,
including for active
travel
Water and drainage
infrastructure as
required. 
h51
Robertsons
Bank,
Gorebridge
Contribution to
additional primary
and secondary
school capacity
Contribution to
community hub
and town centre
improvements
Structure
landscaping and
open space
Contribution to
Borders Rail
Water and drainage
infrastructure as
required. 
h54
Ashgrove,
Loanhead
Contribution to
additional primary
and secondary
school capacity  
Access and
junction
improvements,
including for active
travel
Water and drainage
infrastructure as
required. 
h55 
Seafield
Moor Road,
Bilton
Contribution to
additional primary
school (Bilston
replacing annexe
Contribution to
community
facilities 
Structure
landscaping and
open space and
Access and
junction
improvements,
Water and drainage
infrastructure as
required. 
Page 162 of 222

Page 163

Part 5 – Site Specific Actions 
Page 44 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
to Roslin PS) and
secondary school
capacity 
new green
network links
including for active
travel
h58 
North West
Penicuik
Contribution to
additional primary
and secondary
school capacity
Contribution to
town centre
improvements
Structure
landscaping and
open space and
new green
network links
North West
Penicuik link road
Water and drainage
infrastructure as
required. 
h59 
Crichton
Road,
Pathhead
Contribution to
secondary school
capacity
Contribution to
community/ leisure
facilities
Structure
landscaping and
open space 
Water and drainage
infrastructure as
required. 
h69 
Whitehill
House,
Rosewell   
Contribution to
community
facilities  
Structure
landscaping and
open space and
new green
network links  
Access and
junction
improvements,
including for active
travel  
Water and drainage
infrastructure as
required.   
h70 
Whitehill
House
grounds,
Roswell 
Contribution to
community
facilities  
Structure
landscaping and
open space and
new green
network links 
Access and
junction
improvements,
including for active
travel 
Water and drainage
infrastructure as
required.   
Ec1
Shawfair
Park
extension,
Dalkeith
n/a  Landscaping as
set out in the
Shawfair
masterplan. 
Green network -
planting/footpath/c
ycleway.
Access and
junction
improvements,
including
footpaths and
cycleways.
Shawfair 
Water and drainage
infrastructure as
required. Drainage
Impact Assessment
required. 
Page 163 of 222

Page 164

Part 5 – Site Specific Actions 
Page 45 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
Sheriffhall junction
upgrade. 
(Borders Railway,
including Shawfair
Station, already
delivered.
Ec2
Salter's Park
extension,
Dalkeith
n/a  Structural
landscape. 
Strategic green
space/green
network links. 
Water and drainage
infrastructure as
required. 
Flood Risk
Assessment (FRA)
will be required. 
Ec3
West Straiton
Depends on the
scale of any
housing provided
in this mixed use
site 
Additional
secondary school
capacity required -
Beeslack High
School
replacement. 
Potential additional
primary school
capacity required - 
Structural
landscape. 
Strategic green
space/green
network links.
A701 relief
road/link to A702. 
Access and
junction
improvements,
including
footpaths and
cycleways.
Water and drainage
infrastructure as
required. Further
investigations are
required to assess
impact on network. 
Page 164 of 222

Page 165

Part 5 – Site Specific Actions 
Page 46 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
No solution
identified.
Ec4
Ashgrove
North,
Loanhead
n/a  Structural
landscape. 
Strategic green
space/green
network links. 
Reinforce
landscape
protection for
Straiton Pond
Local Nature
Reserve.
A701 relief
road/link to A702.
Loanhead. 
Access and
junction
improvements,
including
footpaths and
cycleways.
Water and drainage
infrastructure as
required. Further
investigations are
required to assess
impact on network. 
Ec5
Oatslie
Expansion,
Roslin
n/a  Structural
landscape. 
Green network
links.
A701 relief
road/link to A702.
Expansion,
Roslin Access and
junction
improvements,
including
footpaths and
cycleways.
Water and drainage
infrastructure as
required. Scottish
Water has identified
a need for further
growth investment
in the 2021-2027
regulatory period at
Roslin wastewater
treatment works. 
Bt1
Easter Bush
North
n/a  Structural
landscape. 
Green network
links.
A701 relief
road/link to A702. 
This project
includes a new
junction at Bush
Water and drainage
infrastructure as
required. West
Regional Main runs
through the site. 
Page 165 of 222

Page 166

Part 5 – Site Specific Actions 
Page 47 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
Loan/ A702
junction.   
North
Access and
junction
improvements,
including
footpaths and
cycleways.
Scottish Water
require a
significant way leave
surrounding the
route of the pipe
for maintenance and
risk management in
the event of
failure. Early contact
with Scottish Water
recommended.
Drainage
Impact Assessment
to assess impact on
network and
identify mitigation
measures.
Bt2
Easter Bush
South
n/a  Structural
landscape. 
Green network
links.
A701 relief
road/link to A702. 
This project
includes a new
junction at Bush
Loan/ A702
junction.   
North
Access and
junction
improvements,
including
Water and drainage
infrastructure as
required. West
Regional Main runs
through the site.
Scottish Water
require a
significant way leave
surrounding the
route of the pipe
for maintenance and
risk management in
the event of 
Page 166 of 222

Page 167

Part 5 – Site Specific Actions 
Page 48 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
footpaths and
cycleways.
failure. Early contact
with Scottish Water
recommended. 
Drainage
Impact Assessment
to assess impact on
network and
identify mitigation
measures required.
Bt3
Technopole
North
n/a  Structural
landscape. 
Green network
links.
A701 relief
road/link to A702. 
This project
includes a new
junction at Bush
Loan/ A702
junction.   
North
Access and
junction
improvements,
including
footpaths and
cycleways.
Water and drainage
infrastructure as
required. There is
critical infrastructure
in this area, early
contact with Scottish
Water on 
Technopole North
Bt3
West
is highly
recommended.
Drainage Impact
Assessment to
assess impact on
network and identify
mitigation
measures. 
Mx1 
Pentland
Studios,
West Straiton
n/a  Structure
landscaping to
integrate with
A701 relief road
and A702 link plus
potential junction
Similar issues to site
Ec3. 
Page 167 of 222

Page 168

Part 5 – Site Specific Actions 
Page 49 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating  
landscaping for
site Ec3
improvements at
Straiton/A720 and
the A702.
e11
Hardengreen  
Structure
landscaping and
open space
Access and
junction
improvements,
including for active
travel
Water and drainage
infrastructure as
required. 
e14 
Salter’s Park,
Dalkeith  
Structure
landscaping and
open space 
New Green
Network links
Access and
junction
improvements,
including for active
travel 
Water and drainage
infrastructure as
required. 
e16
Hopefield,
Bonnyrigg  
Structure
landscaping and
open space 
Access and
junction
improvements,
including for active
travel 
Water and drainage
infrastructure as
required. 
e21 
Stobhill
Road,
Newtongrane  
Structure
landscaping and
open space 
Water and
drainage
infrastructure as
required. 
Water and drainage
infrastructure as
required. 
e22
Redheugh,
Gorebridge  
Structure
landscaping and
open space 
Access and
junction
improvements,
including for active
travel
Water and drainage
infrastructure as
required. 
Page 168 of 222

Page 169

Part 5 – Site Specific Actions 
Page 50 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating 
e24 
Gorton Road,
Roswell  
Structure
landscaping and
open space 
Access and
junction
improvements,
including for active
travel 
Water and drainage
infrastructure as
required. 
e26 
Whitehill
Mains,
Shawfair  
Community
woodland,
structural
landscaping and
Shawfair open
space 
Water and drainage
infrastructure as
required. 
District Heating,
Combined Heat
and Power
e27
(Shawfair
Park)  
Community
woodland,
structural
landscaping and
Shawfair open
space 
Water and drainage
infrastructure as
required. 
District Heating,
Combined Heat
and Power
e32
Sheriffhall
South,
Dalkeith  
Structure
landscaping and
open space 
Access and
junction
improvements,
including for active
travel 
Water and drainage
infrastructure as
required. 
e33
Ashgrove,
Loanhead  
Structure
landscaping and
open space, to
include re-inforced
landscape
protection for
Access and
junction
improvements,
including for active
travel 
Water and drainage
infrastructure as
required. 
Page 169 of 222

Page 170

Part 5 – Site Specific Actions 
Page 51 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
Straiton Pond
LNR.    
e34 
Oatslie,
Roslin  
Structure
landscaping and
open space 
New Green
Network links
Access and
junction
improvements,
including for active
travel 
Water and drainage
infrastructure as
required. 
b6 
Easter Bush  
Structure
landscaping and
open space 
Access and
junction
improvements,
including for active
travel 
Water and drainage
infrastructure as
required. 
b7 
Gowkley
Moss North  
Structure
landscaping and
open space 
Access and
junction
improvements,
including for active
travel 
Water and drainage
infrastructure as
required. 
b8 
Gowkley
Moss South  
Structure
landscaping and
open space 
Access and
junction
improvements,
including for active
travel 
Water and drainage
infrastructure as
required. 
b9 
New Milton  
Structure
landscaping and
open space 
Access and
junction
improvements,
Water and drainage
infrastructure as
required. 
Page 170 of 222

Page 171

Part 5 – Site Specific Actions 
Page 52 
Site Ref
and Name Education Community
facilities
Green
Infrastructure Transport Water and Drainage Waste and
Heating
including for active
travel 
Page 171 of 222

Page 172

Page 53 
Part 6 –
Policy Actions
Policy Actions 
18. This section (Table 10) reviews and updates the interpretation and application of the policy
framework of the plan.   Since MLDP 2017 was adopted, monitoring of the policies has been carried
out, to assess how the policies in the plan have been used, and to identify gaps in the plan which
require a policy response. NPF4 supersedes many of the policies in the adopted plan, and the
Council is considering the scope of its policies for the replacement LDP in this context.  The status
of Supplementary Guidance (SG) is also addressed in Table 11.   
Page 172 of 222

Page 173

Part 6 – Policy Actions 
Page 54 
Table 10: Policy Framework
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
STRAT 1
Committed
Development
To ensure proposals
allocated in the adopted
and previous plans are
implemented as part of the
agreed development
strategy.
Monitor and report
progress of sites via
HLA and ELA annual
updates, planning
application register
and building warrant
completion
certificates. 
Maintain dialogue
with developers to
identify any
obstacles to
progress and agree
implementation
strategy.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Developers and
landowners
None HLA 2024 agreed
with housebuilders. 
ELA 2024
completed.   
Planning
Performance
Framework 2023-
24. 
Development Plan
Monitoring Group –
ongoing.
STRAT 2
Windfall
Housing Sites
To indicate general support
for housing development on
non-planned sites and the
criteria to be used to
assess applications.
Monitor through HLA
process including
Homes for Scotland
meetings, planning
application register
and building warrant
completion
certificates.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
None, although
note change to
windfall policy
introduced by
NPF4.  
Ongoing monitoring
and annual
reporting through
HLA. 
HLA 2024 provides
latest position.
STRAT 3
Strategic
Housing Land
Allocations
To identify the housing sites
which constitute the
development plan strategy
Monitor through HLA
process including
Homes for Scotland
meetings, planning
applications register
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Need for more
consideration on
demand for and
location of care
homes and wider
Ongoing monitoring
and annual
reporting through
HLA. 
Page 173 of 222

Page 174

Part 6 – Policy Actions 
Page 55 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
and building warrant
completion
certificates. 
Maintain dialogue
with Homes for
Scotland/developers
to identify any
obstacles to
progress and agree
implementation
strategy.
Developers and
landowners
spectrum of
facilities and
housing for older
people or those
with disabilities
(also in relation to
DEV3).
HLA 2024 provides
latest position. 
Ongoing dialogue
with site promoters/
developers and
Homes for
Scotland.
STRAT 4
Additional
Housing
Development
Opportunities
To identify sites which may
come forward over the plan
period and which provide
additional flexibility.
Monitor through HLA
process, Homes for
Scotland liaison
meetings, planning
application register
and building warrant
completion
certificates.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
None Ongoing
monitoring, annual
reporting through
HLA. 
HLA 2024 provides
latest position. 
AHs1 has
commenced
construction. AHs5
is consented.
STRAT 5
Strategic
Employment
Land
Allocations
To identify the economic
sites which constitute the
development plan strategy.
Monitor and report
on progress of sites
via ELA annual
updates, planning
application register
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
None ELA 2024
prepared. 1.9ha
take-up in last year.   
Ongoing monitoring
for next ELA.
Page 174 of 222

Page 175

Part 6 – Policy Actions 
Page 56 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
and building warrant
completion
certificates. 
Maintain dialogue
with developers to
identify any
obstacles to
progress and agree
implementation
strategy. 
Analyse economic
development and
estates enquiry data
to identify market
needs to inform
future planning
Developers and
landowners
DEV1
Community
Identity and
Coalescence
To ensure due
consideration is given to
the impact of proposed
development between
existing settlements and
communities with the
intention to prevent
coalescence.
Monitor planning
applications and
advise/liaise with
case officers.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
The policy has
been cited in
decision making on
a relatively low
number of
occasions.
Discussion with
officers has
indicated that lack
of spatial definition
to policy on the
proposals maps
Ongoing monitoring
Page 175 of 222

Page 176

Part 6 – Policy Actions 
Page 57 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
may have
contributed to this.
DEV2
Protecting
Amenity within
the Built-Up
Area
To protect and enhance the
amenity of residential areas
Monitor planning
applications and
advice/liaise with
case officers
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Need for further
policy to develop
DEV2 (and DEV6),
also relationship
with place making
policies in NPF4.
Amongst other
things, garden
ground and open
space standards
and sunlight and
daylight at new and
existing properties,
need to be
considered.   
Road safety a ‘gap’
in plan, potential
need to anchor
more fully in
development plan
itself, not rely on
road standards. 
This should also
consider
convenience and
safety on non-
motorised users,
Ongoing monitoring
Page 176 of 222

Page 177

Part 6 – Policy Actions 
Page 58 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
including
wheelchair and
pushchair users. In
the case of Trunk
Roads,
consideration of
policy approaches
will involve
Transport Scotland. 
Need to
incorporate or
reflect parking
standards in
MLDP2.  
DEV3
Affordable and
Specialist
Housing
To indicate how the Council
expects to deliver more
affordable housing as part
of the development
strategy.
Former action was
to prepare and
adopt new SG on
Planning Obligations
and Affordable
Housing.  As
reported in DPS16
and decided by
Midlothian Council
no further SG in
connection with the
adopted plan will be
taken forward. 
Monitor through HLA
process, Housing 
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Registered Social
Landlords, Midlothian
Council Housing
Services
Need for more
consideration on
demand for and
location of care
homes and wider
spectrum of
facilities and
housing for older or
disabled people. 
Consider if policy
position on HMOs
required.   
Monitoring and
liaison meetings
and annual
reporting. 
Page 177 of 222

Page 178

Part 6 – Policy Actions 
Page 59 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
Service/ RSLs and
Homes for Scotland
liaison meetings,
planning application
register and building
warrant completion
certificates. 
Consider policy on
accessible housing
in light of new
Scottish Building
Standard.
Consider provision
for gypsy travellers. 
Progress review of
these matters
through MLDP2.
DEV4
Residential Park
Homes
To identify residential park
homes as part of the range
and choice of housing
tenures and protect sites
from redevelopment
pressures.
Monitor planning
applications in
respect of the
designated sites and
liaise with/advise
case officers
appropriately.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing monitoring
DEV5
Sustainability in
New
Development
Promotes the principles of
sustainability in the design
and construction of new
development.
Monitor planning
applications, liaise
with case officers as
required.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing monitoring
Page 178 of 222

Page 179

Part 6 – Policy Actions 
Page 60 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress 
DEV6
Layout and
Design of New
Development
Indicates layout and open
space design
considerations for new
developments.
Monitor planning
applications, liaise
with case officers as
required.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Need for further
policy to develop
DEV6 (and DEV2),
also relationship
with place making
policies in NPF4.
Amongst other
things, garden
ground and open
space standards
and sunlight and
daylight at new and
existing properties,
need to be
considered.
Ongoing
monitoring.
DEV7
Landscaping in
New
Development
Indicates landscape design
considerations for new
developments.
Monitor planning
applications, liaise
with case officers 
Former action was
to prepare and
adopt new SG on
Quality
of Place. As
reported in DPS16
and decided by
Midlothian Council
no further SG in
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No further action in
respect of SG
No matters arising. Ongoing
monitoring.
Page 179 of 222

Page 180

Part 6 – Policy Actions 
Page 61 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
connection with the
adopted plan will be
taken forward. 
DEV8
Open Spaces
A criteria-based policy to
protect and enhance
identified open spaces.
Monitor planning
applications, liaise
with case officers. 
Monitor progress of
open space strategy
action plan.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Midlothian Council
Land and Countryside
Service 
Small pockets of
amenity space
under pressure,
possible need for
stronger, more all-
embracing policy
for these areas,
maybe linked to
more place-based
plan.  
Ongoing
monitoring. 
DEV9
Open Space
Standards
To identify the open space
standards applicable to
open space provision in
new developments. 
Monitor planning
applications, liaise
with case officers
and apply standards
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing review.
DEV10
Outdoor Sports
Facilities
To protect outdoor sports
facilities from alternative
use developments.
Monitor planning
applications, liaise
with case officers. 
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Consider
appropriateness of
policy and linkages
to wider open
space and
recreation policy,
and more place-
based new style
LDP.
Ongoing
monitoring.
ECON1 To protect established
economic sites from
Monitor and report
progress of sites via
Midlothian Council
Planning, Sustainable
Important to ensure
an adequate supply
Ongoing monitoring
and annual
Page 180 of 222

Page 181

Part 6 – Policy Actions 
Page 62 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
Existing
Employment
Locations
redevelopment for
alternative non-
employment generating
uses.
ELA annual updates,
monitoring planning
applications and
building warrant
completion
certificates. 
Maintain dialogue
with developers to
identify any
obstacles to
progress and agree
implementation
strategy. 
Dialogue with
Economic
Development
Team to contribute
to Economic
Development
Strategy and reflect
strategy in planning
practice.
Growth and Investment
Service 
Landowners/
developers
of cheap accessible
sites for start-up
companies and
other marginal
traders.   
Consider breadth of
uses that are
acceptable in
employment
allocations, (but
also consider NPF4
Policy 27, and
widening of Town
Centre first to
embrace more
uses)
reporting (ELA).
ECON2
Midlothian
Science Zone
To protect and promote the
Midlothian Science Zone
biotechnology cluster as a
specialist economic sector.
Monitor and report
progress of sites via
ELA annual updates. 
Monitor planning
applications.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Need to consider
Midlothian Science
Zone policy,
alongside review of
the Bush
Masterplan.  
Ongoing, annual
reporting through
ELA. 
Recent discussion
with Midlothian
Page 181 of 222

Page 182

Part 6 – Policy Actions 
Page 63 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress 
Liaise with Case
Officers and
economic
development
colleagues and with
the Midlothian
Science Zone
Steering Group.
Science Zone
occupiers and
landowners as part
of MLDP2 Evidence
Report preparation.  
ECON3
Ancillary
Development on
Business Parks
To support the principle of
development on Shawfair
Park and Salter's Park to
provide services to their
current and future
workforces. Policy provides
guidance on type of use(s)
and criteria influencing
consideration.
Monitor and report
progress of sites via
ELA annual updates,
Planning
applications and
building warrant
completion
certificates. 
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Consider breadth of
uses that are
acceptable in
employment
allocations, (but
also consider NPF4
Policy 27, and
widening of Town
Centre first to
embrace more
uses) – also applies
to ECON1. 
Ongoing, annual
reporting through
ELA.
ECON4
Economic
Development
outwith
Established
Business and
Industrial Sites 
To provide policy
framework for economic
development within the
defined urban area, where
not on a recognised
economic development site
or location.
Monitor and report
progress of sites via
ELA annual updates,
planning
applications and
building warrant
completion
certificates.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing, annual
reporting through
ELA.
Page 182 of 222

Page 183

Part 6 – Policy Actions 
Page 64 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
ECON5
Industries with
Potentially
Damaging
Impacts
To provide guidance about
operations that may have
damaging impacts on the
environment, human health
and the physical fabric,
health and wellbeing of
communities.
Monitor and report
progress of sites via
ELA annual updates,
planning
applications and
building warrant
completion
certificates.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Policy not spatially
referenced, MLDP
review could
consider identifying
sites where such
industries be
located.  
Ongoing, annual
reporting through
ELA
ECON6
Working from
Home/Micro
Businesses
To promote economic
growth and reduce the
need to travel.
Monitor planning
applications and
building warrant
completion
certificates.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing
ECON7
Further
Education
Facilities
Supports the retention and
expansion of further
education and adult
education facilities.
Monitor planning
applications. 
Encourage pre-
application
discussion on future
development/ estate
masterplans
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Midlothian Council
Education Service,
Edinburgh College,
University of Edinburgh
and Newbattle Abbey
College 
Policy unused. Ongoing. 
Meetings held with
Edinburgh College
and UoE in 2023 on
future aspirations. 
TRAN1
Sustainable
Travel
To promote, raise
awareness of and prioritise
support for alternative
travel modes other than the
car.
Support
development close
to public transport,
liaise with case
officers, planning
Midlothian Council
Planning, Sustainable
Growth and Investment
Service   
No matters arising Ongoing
monitoring. 
Midlothian Council
Active Travel
Page 183 of 222

Page 184

Part 6 – Policy Actions 
Page 65 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
and transport
officers on
applications and
potential transport
requirements,
ensure proposed
developments
comply with LDP
and emerging
replacement Local
Transport
Strategy.
Strategy published
2019, consultation
on new strategy
carried out 2024.   
Involve Transport
Scotland in any
discussions relating
to active travel and
trunk roads. 
TRAN2
Transport
Network
Interventions
To identify the transport
interventions required to
support the LDP strategy
(as identified in the LDP
DPMTAG appraisal). 
To safeguard transport
schemes agreed as part of
the NPF, SDP and/or
committed development.
Monitor planning
application register,
liaise with DM
Officers and
Transport
Policy Officers to
ensure that
requirements are
secured. 
Council to continue
to liaise with bus
operators and
support bus
provision were able.  
Midlothian Council
Planning, Sustainable
Growth and Investment
Service   
Midlothian Council
Transport Service 
No matters arising Ongoing
monitoring. 
A720 Sheriffhall
junction grade
separation project
has been taken
forward as part of
City Region Deal
and has progressed
to Public Inquiry.
Decision awaited
from Scottish
Government.  The
Council will liaise
with Transport
Scotland on options
Page 184 of 222

Page 185

Part 6 – Policy Actions 
Page 66 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
if grade separation
of the Sheriffhall
junction is not
supported and
does not proceed. 
A701 relief road
and A702 link road
proposals
progressing as part
of City Region Deal. 
There is currently a
funding shortfall for
the whole project,
so it is to be phased
with priority given to
the Bush
Loan/A702
junction; A720/A68
junction link road
included in
application for site
Hs1 (under
construction); A7
Urbanisation
scheme design
work underway/
developer
contributions being
collected.
Page 185 of 222

Page 186

Part 6 – Policy Actions 
Page 67 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress 
Park and Ride –
land set aside for
proposed A68
North (Newton
Farm) facility (part
of consent
17/00408/DPP). 
Orbital bus route
(A720 City Bypass)
included in
indicative STPR2
maps along with
rapid transit routes
from Edinburgh to
Midlothian;
Shawfair
infrastructure in
progress as part of
agreed
implementation. 
Interim Regional
Spatial Strategy
prepared in tandem
with NPF4
preparation.
Page 186 of 222

Page 187

Part 6 – Policy Actions 
Page 68 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
TRAN3
Strategic
Transport
Network
To support implementation
of the grade separation of
Sheriffhall
Roundabout.
The Public Inquiry
has concluded, and
the report is with
Scottish Ministers. 
Midlothian Council
Planning and
Transport Services
have been involved
through attendance
at design
consultation
workshops and
supporting
development of
Cross Boundary
Transport
Contributions
Framework.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service   
Midlothian Council
Transport Services 
No matters arising Ongoing, await
Ministerial decision.  
TRAN4 
Freight
To support the principle of
freight development and to
guide development to
locations close to the rail
and/or strategic road
networks.
Monitor planning
application register,
investigate options
at Millerhill
Marshalling yards
given access
improvements
created by zero
waste facility and
prospects generated
by the development
of Shawfair new
Midlothian Council
Planning, Sustainable
Growth and Investment
Service   
Midlothian Council
Transport Service  
Policy Unused Ongoing with
annual review
through ELA. 
Anaerobic Digester
(AD) and Recycling
and Energy
Recovery Centre
(RERC) operational,
Road widening
improvements
along Whitehill
Page 187 of 222

Page 188

Part 6 – Policy Actions 
Page 69 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
community. Road from junction
with Fort Kinnaird
Retail Park and
waste facility site
complete. 
Approximately 9ha
of land to south of
RERC available for
economic/waste
development.
TRAN5
Electric Vehicle
Charging
To support the provision of
electric vehicle charging
points in new developments
and service stations to
extend and develop an
electric vehicle network to
encourage their ownership
and use as a contribution to
lowering CO2 emissions.
Extend charging
facilities across
council property,
monitor planning
application register,
encourage private
developers to
consider the
issue in pre-planning
and planning
application process,
promote through
Community Planning
Partnership.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service   
Midlothian Council
Transport Services 
Midlothian Community
Planning
Partnership
No matters arising Ongoing/annual
monitoring
including within the
council's
annual climate
change reporting
duties in respect of
its estate.
IT1
Digital
Infrastructure
To support the
development of a robust
digital communications
network to promote
economic growth and to
Monitor planning
applications and
liaise with case
officers to ensure
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing, including
as part of the
Development Plan
Monitoring Group.
Page 188 of 222

Page 189

Part 6 – Policy Actions 
Page 70 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
identify criteria to stimulate
careful siting, design and
operation of such
equipment.
appropriate
conditions/controls
are applied.
TCR1
Town Centres
To support the role of town
centres by promoting
development which
increases their viability and
controlling changes of use
in them.
Prepare SG on, food
and drink and other
non-retail uses in
town centres. 
Prepare shop-front
design guide. 
Prepare town centre
strategies. 
Monitor planning
applications and
liaise with case
officers to ensure
implementation of
policy.   
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Stronger defence of
shopfronts from
being ‘deadened’
by conversion to
uses such as
housing, or
conversely
consideration of
need for town
centre shrinkage
where too big to
sustain current
level of commercial
activity. 
Consultation with
Economic
Development and
Estates required to
consider future
needs. 
Incorporation of
NPF4 requirements
in relation to fast
food or other
potentially negative
SG adopted in
2019. 
Gap in town centre
health checks since
2019, although
vacancy and
composition
monitoring has
been carried out.   
Shopfront
Guidance produced
for Dalkeith but not
for other centres.   
Work being carried
out between
Planning service,
Midlothian property
and community
interests in several
town centres.   
Ongoing monitoring
Page 189 of 222

Page 190

Part 6 – Policy Actions 
Page 71 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
uses in town
centres or other
sensitive areas
such as schools.  
TCR2
Location of New
Retail and
Commercial
Leisure
Facilities
To set out criteria for
locating new retail
development, in
accordance with town
centre first principle and
sequential test, and SDP
(now superseded).
Monitor planning
applications and
liaise with case
officers to ensure
implementation of
policy.  
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
A stronger town
centre first
approach for a
wider range of uses
needs to be
considered.  NPF4
Policy 27 now
widens the range of
activities covered
by town centre first. 
More plan led
approach to
location of
neighbourhood
convenience
shopping facilities.   
Need to address
drive through
restaurants (also
required by NPF4).
Ongoing monitoring
VIS1
Tourist
Attractions
To support the principle of
tourist development and
protect existing or
Monitor planning
applications and
liaise with case
officers to ensure
Midlothian Council
Planning, Sustainable
Growth and Investment
Service
No matters arising Ongoing monitoring
Page 190 of 222

Page 191

Part 6 – Policy Actions 
Page 72 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
consented tourist
attractions against adverse
impact from other
development.
implementation of
policy.   
VIS2
Tourist
Accommodation
To provide criteria to
support tourist
accommodation proposals
and guidance on hotels and
self catering
accommodation.
Monitor planning
applications and
liaise with case
officers to ensure
implementation of
policy.  
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Need to consider
visitor
accommodation
policy in rural
areas, in regard to
small scale facilities
(also implications
for RD1). 
Need to be aware
of potential for
visitor cottages to
become standard
houses through
challenges to
conditions, and
implications
thereof.   
Need to consider
possible STL
control policy.  
Ongoing monitoring
VIS3
Midlothian
Snowsports
Centre
To provide support for the
development and
enhancement of the centre
as a 'centre for excellence'.
Monitor planning
applications and
liaise with case
officers to ensure
Midlothian Council
Planning, Sustainable
Growth and Investment
Service
No matters arising The upgrading and
enhancement of the
snowsports centre
was carried out in
Page 191 of 222

Page 192

Part 6 – Policy Actions 
Page 73 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
implementation of
policy.    Midlothian Council
Estate Service 
Sportscotland.
2024.  Ongoing
monitoring to
ensure correct
application of
policy.  
MIN1
Areas of Search
for Surface
Mineral
Extraction
To define areas of search
for sand and gravel and
open cast coal extraction
and set presumption
against extraction outwith
these areas. To protect
valuable resources from
sterilisation by other
developments.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied. Liaise with
enforcement officers
as appropriate.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Industry Bodies
Policy unused - no
relevant
applications (there
has been pre-
application
discussion on
aggregates
extraction at two of
the areas of
search).
Ongoing monitoring
MIN2
Surface
Minerals
Extraction
To define criteria by which
the acceptability of mineral
extraction proposals are
determined.  
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied. Liaise with
enforcement officers
as appropriate. 
Prepare SG on
resource extraction.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Industry Bodies
No matters arising Ongoing
monitoring,
including over
lifetime of consents
and restoration
period.   
Action completed –
SG adopted in
2019
MIN3
Onshore Oil
and Gas
To set policy framework for
onshore oil and gas
extraction
Following Ministerial
decision on
Midlothian Council
Planning, Sustainable
Scotland wide ban
– policy now
redundant.
No further action
given Scottish
Government
Page 192 of 222

Page 193

Part 6 – Policy Actions 
Page 74 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
unconventional oil
and gas, monitor
planning
applications and
liaise with case
officers as
appropriate. 
Prepare SG on
resource extraction
(in context of
Ministerial decision
on unconventional
oil and gas).
Growth and Investment
Service 
decision not to
support
unconventional gas
extraction. 
SG adopted, but
does not address
this matter following
Scottish
Government
decision on
unconventional oil
and gas.
RD1
Development in
the Countryside
To define criteria for
general
development in the
countryside and specific
considerations for housing
and business development.
Revise SG on
Housing
Development
in the Green Belt
and Countryside 
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Review of housing
‘cluster’ policy in
countryside.   
Awareness
required of rural
brownfield
opportunities. More
‘place-based’
approach.   
Consider future
approach to
occupancy
condition linked
Action completed -
SG adopted in
2019 
Consult Transport
Scotland where
rural development
requires new or
improved access
from the trunk road
network.
Page 193 of 222

Page 194

Part 6 – Policy Actions 
Page 75 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
development, in
context of NPF4. 
Consider approach
to rural shops,
where small scale
and offers
something of a
visitor experience
and not in direct
competition with
town centres.   
Odour issues and
proximity to
pipelines have
come up in relation
to rural
development (could
affect other areas
too), need
consideration as
potential ‘gaps’. 
Need to consider
policy for former
quarry sites, or
rural VDL land
where no
Page 194 of 222

Page 195

Part 6 – Policy Actions 
Page 76 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
restoration
condition.   
RD2
Low Density
Rural Housing
To set out conditions for
housing development at
four specific locations in
order to bring about
environmental
enhancement in these
areas.
Revise SG 
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied. 
Establish dialogue
with developers to
identify any
obstacles to
progress and agree
implementation
strategy.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Landowners and
developers
None Action completed –
SG adopted 2020. 
Ongoing monitoring 
Ongoing –
developer interest
and progress at
some of the sites.
RD3
Pentland Hills
Regional Park
To protect the Pentland
Hills Regional Park from
proposals that do not
accord with its stated aims
and/or the current or future
management plans for it.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Pentland Hills Regional
Park Authority
No matters arising Ongoing monitoring
RD4
Country Parks
To support development
within country parks that is
compatible with any
management plan and
Monitor planning
applications and
liaise with case
officers to ensure
Midlothian Council
Planning, Sustainable
Growth and Investment
Service
No matters arising Ongoing monitoring
Page 195 of 222

Page 196

Part 6 – Policy Actions 
Page 77 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
to further the enjoyment of
the park for outdoor
recreation and activity.
appropriate
conditions/controls
applied. 
Liaise with Land and
Countryside
Services as
appropriate. 
Midlothian Council
Land and Countryside
Service
ENV1
Protection of
the Green Belt
To protect the green belt
and set out criteria to
assess development
proposals
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied. 
Revise countryside
SG to include green
belt matters
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Most consented
planning
applications relate
to smaller scale
proposals such as
householder
applications, single
dwelling houses,
camping pods,
renovation of
existing and
erection of new
agricultural
buildings. 
Developments
consented in Green
Belt since last
review need to be
considered, to
ensure that its
Ongoing
monitoring. 
Action completed –
SG adopted in
2019.
Page 196 of 222

Page 197

Part 6 – Policy Actions 
Page 78 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
spatial extent
remains rational.   
Consider Reporter
findings in relation
to Green Belts, in
planning appeals in
the area.  
ENV2
Midlothian
Green Network
To provide the policy
framework for developing
the Midlothian Green
Network
Prepare SG 
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Midlothian Council
Land and Countryside
Service 
SNH, CSGN and
landowners/ developers
No matters arising Action completed –
SG adopted in
2018
ENV3
Newbattle
Strategic
Greenspace
Safeguard
To identify a new protected
greenspace based around
the River South Esk and to
set criteria to consider new
development in this area
(cross reference with policy
RD1). 
Longer term intention to
seek a means of creating a
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Midlothian Council
Land and Countryside
Service 
CSGN and landowners/
developers
Considered that
Newbattle Strategic
Greenspace
Safeguard has
been successful in
its ambition to
prevent
coalescence. It has
received positive
feedback from
members of the
Ongoing
monitoring. 
It is unlikely that
further progress on
creation of a new
country park will
come forward in the
remaining duration
of LDP.  This will be
a matter for MLDP2
Page 197 of 222

Page 198

Part 6 – Policy Actions 
Page 79 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
new country park as part of
the green network.
public and has
been supported by
the Council.
ENV4
Prime
Agricultural
Land
To protect prime
agricultural land from
development and identify
criteria to assess
development proposals.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing
monitoring.
ENV5
Peat and
Carbon Rich
Soil
To protect peat and carbon
rich soils and minimise
release of CO2 emissions
from development.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing
monitoring.
ENV6
Special
Landscape
Areas
Prepare SG and monitor
impact. 
To define conditions when 
development in SLAs may
be permitted. 
Prepare SG and
monitor impact. 
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising SG adopted in
2018. 
Ongoing
monitoring.
ENV7
Landscape
Character
To protect landscape
character and ensure it is
not compromised by
Monitor planning
applications and
liaise with case
Midlothian Council
Planning, Sustainable
No matters arising Ongoing
monitoring.
Page 198 of 222

Page 199

Part 6 – Policy Actions 
Page 80 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
development, maintaining
the distinctiveness of the
landscape and enhancing
character where it has
been weakened.
officers to ensure
appropriate
conditions/controls
applied.
Growth and Investment
Service 
ENV8
Protection of
River Valleys
To protect the landscape
and character of river
valleys.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing
monitoring.
ENV9
Flooding
To prevent new
development at risk of
flooding or which increases
the risk of flooding
elsewhere and support
implementation of Local
Flood Risk Management
Plans.
Monitor planning
applications and
liaise with case
officers, SEPA,
Scottish Water and
others as required to
ensure appropriate
conditions/controls
applied. 
Contribute to
preparation of Local
Flood Risk
Management Plans
for the Forth Estuary
Flood Risk
Management
Plan district.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Midlothian Council
Transport Service 
SEPA 
Scottish Water 
LFRMP partners 
No matters arising Ongoing
monitoring. 
Local Flood Risk
Management Plan
was updated in
2022 (6-year cycle
so next LFRMP due
in lifetime of
MLDP2). 
Midlothian Council
participated in
these groups,
which led to the
production of the
Local FRMP for the
Page 199 of 222

Page 200

Part 6 – Policy Actions 
Page 81 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress 
Participate in flood
risk management
groups. 
Update Strategic
FRA. 
Former action was
to prepare and
adopt new SG on
Flooding and the
Water Environment
As reported in
DPS16 and decided
by Midlothian
Council no further
SG in connection
with the adopted
plan will be taken
forward.
Forth Estuary Flood
Risk Management
Plan district. 
A revised SFRA has
been prepared in
2024 as part of the
MLDP2 Evidence
Report Process. 
No further action on
SG. 
ENV10
Water
Environment
To ensure that planning
decisions contribute to
good river basin and water
body management.
Monitor planning
applications and
liaise with case
officers, SEPA,
Scottish Water and
others as required to
ensure appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
SEPA, Scottish Water,
landowners and
developers, 3rd sector
No matters arising Ongoing monitoring 
Surface Water
Management Plans
(SWMPs) are an
action in the 2022
Local Flood Risk
Management Plan
(LFRMP).
Page 200 of 222

Page 201

Part 6 – Policy Actions 
Page 82 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress 
Contribute to
preparation of
Surface Water
Management Plans. 
Contribute to
preparation and
implementation of
River Basin
Management Plans
for Scotland. 
Contribute to work
of Edinburgh and
Lothians Drainage
Partnership
and community
involvement  A 3rd River Basin
Management Plan
was adopted in
2021, covering the
period 2021-2027. 
Midlothian Council
is seeking partners
to work on pilot
projects in district. 
ENV11
Woodland,
Trees and
Hedges
To establish the principle of
protecting established
woodland, groups of trees
and hedgerows from loss
or damage from
development.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
(refer to Scottish
Government policy
on woodland
removal).
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Midlothian Council
Land Service 
Scottish Forestry,
landowners/developers
No matters arising Ongoing
monitoring.
ENV12
Internationally
Important
To reinforce the
presumption in favour of
protecting designated
Monitor planning
applications and
liaise with case
Midlothian Council
Planning, Sustainable
No matters arising Ongoing
monitoring. 
Page 201 of 222

Page 202

Part 6 – Policy Actions 
Page 83 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
Nature
Conservation
Sites
nature sites of national
importance and identify a
precautionary approach
where development
impacts are uncertain but
may cause irreversible
damage
officers to ensure
appropriate
conditions/controls. 
Prepare Planning
Guidance on nature
conservation. 
Growth and Investment
Service 
Planning Guidance
adopted 2020.
ENV13
Nationally
Important
Nature
Conservation
Sites
To reinforce the
presumption in favour of
protecting designated
nature sites of national
importance and identify a
precautionary approach
where development
impacts are uncertain but
may cause irreversible
damage.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls. 
Prepare Planning
Guidance on nature
conservation. 
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing
monitoring. 
Planning Guidance
adopted 2020.
ENV14
Regionally and
Locally
Important
Nature
Conservation
Sites
Identifies regional and
locally important nature
conservation sites and
reinforces the presumption
in favour of protecting
them.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls. 
Prepare Planning
Guidance on nature
conservation. 
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing
monitoring. 
Planning Guidance
adopted 2020.
Page 202 of 222

Page 203

Part 6 – Policy Actions 
Page 84 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress 
ENV15
Species and
Habitat
Protection and
Enhancement
Identifies the types of
assessment required by
development that would
affect a species protected
by European or UK law and
the criteria against which
applications will be
assessed. Identifies that the
nature conservation effects
of development on habitats
of conservation value will
be taken into account.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls. 
Prepare Planning
Guidance on nature
conservation. 
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing
monitoring. 
Planning Guidance
adopted 2020.
ENV16
Vacant, Derelict
and
Contaminated
Land
Provides policy framework
for the redevelopment of
vacant and derelict land
Monitor planning
applications and
liaise with Officers to
ensure appropriate
conditions/controls. 
Reporting on vacant
and derelict land in
National Planning
Improvement
Framework.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Midlothian Council
Environmental Health
and Building Standards
Service
Need to consider to
what extent policy
might be
strengthened and
widened to
consider ground
stability matters: at
present a coal
mining risk
assessment
(CMRA) is required
for all applications
located in the high
risk areas as
identified by the
Coal Authority, but
useful to provide
Ongoing
monitoring. 
Annual reporting.
Page 203 of 222

Page 204

Part 6 – Policy Actions 
Page 85 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
policy support for
this.   
ENV17
Air Quality
To provide a basis for
protecting air quality in
determining planning
applications.   
Monitor planning
applications and
liaise with case
officers and
Environmental
Health to ensure
appropriate
conditions/controls. 
Contribute to the
Council’s Cleaner
Air for Scotland
Working Group
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Midlothian Council
Environmental Health
Service
No matters arising Ongoing
monitoring. 
Limited involvement
to date, a Clean Air
Policy for Scotland
(CAFS) has been
adopted and will
inform future
planning policy.  
ENV18
Noise
Supports decision-making
to avoid conflicts between
noisy and sensitive uses.
Monitor planning
applications and
liaise with Case
Officers and
Environmental
Health to ensure
appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Midlothian Council
Environmental Health
Service
Necessary to
consider whether
policy ENV18
should be put on
more quantitative
basis, including
reference to
required NR curves
or other standards
(e.g., BS4142 or
WHO Health
Guidelines)   
Ongoing
monitoring.
Page 204 of 222

Page 205

Part 6 – Policy Actions 
Page 86 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
ENV19
Conservation
Areas
Reinforces the presumption
against development that
would adversely impact on
the character and
appearance of the area.
Sets out criteria for new
buildings, extensions,
alterations and demolitions.
Monitor planning
applications and
liaise with case
officers and Historic
Environment
Scotland as
appropriate to
ensure appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Historic Environment 
Scotland, East Lothian
Archaeology Service
(through SLA),
Developers
Consider new
CACAMP
documents, these
may generate more
place-based
information or
requirements to be
reflected in new
style LDP.  
Ongoing monitoring
ENV20
Nationally
Important
Gardens and
Designed
Landscapes
Reinforces the presumption
against development that
would harm the
appearance and setting of
a garden or designed
landscape included on
Historic Environment
Scotland's Inventory of
sites.
Monitor planning
applications and
liaise with case
officers and Historic
Environment
Scotland when/as
appropriate to
ensure appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Historic Environment 
Scotland, East Lothian
Archaeology Service,
Developers
No matters arising Ongoing monitoring
ENV21
Nationally
Important
Historic
Battlefields
Provides policy basis to
protect, conserve and
where appropriate
enhance the key landscape
characteristics and special
qualities of sites in Historic
Environment Scotland's
Inventory of Historic
Battlefields.
Monitor planning
applications and
liaise with case
officers and Historic
Environment
Scotland when/as
appropriate to
ensure appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Historic Environment 
Scotland, East Lothian
Archaeology Service,
Developers
No matters arising Ongoing monitoring
Page 205 of 222

Page 206

Part 6 – Policy Actions 
Page 87 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
ENV22
Listed Buildings
Reinforces the presumption
against development that
would adversely affect the
character, appearance
or setting of a listed
building. Sets out criteria
for new development,
enabling development,
demolitions, extensions/
alterations.
and changes of use.
Monitor planning
applications and
liaise with case
officers and Historic
Environment
Scotland when/as
appropriate to
ensure appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Historic Environment 
Scotland, East Lothian
Archaeology Service,
Developers
Take on-board the
Historic
Environment 
Scotland Interim
Guidance and the
Final Guidance
when available.  
Ongoing monitoring
ENV23
Scheduled
Monuments
Reinforces the presumption
against development that
would have an adverse
effect on a scheduled site
or the integrity of its setting.
Monitor planning
applications and
liaise with case
officers and Historic
Environment
Scotland when/as
appropriate to
ensure appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Historic Environment 
Scotland, East Lothian
Archaeology Service,
Developers
No matters arising Ongoing monitoring
ENV24
Other Important
Archaeological
or Historic Sites
Reinforces the protection of
these sites but outlines
criteria against which
development would be
assessed.
Monitor planning
applications and
liaise with case
officers and Historic
Environment
Scotland when/as
appropriate to
ensure appropriate
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Historic Environment 
Scotland, East Lothian
Archaeology Service,
Developers
No matters arising Ongoing monitoring
Page 206 of 222

Page 207

Part 6 – Policy Actions 
Page 88 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
conditions/controls
applied.
ENV25
Site
Assessment,
Evaluation and
Recording
Outlines the nature and
extent of works required
where sites may be
affected by proposed
development.
Monitor planning
applications and
liaise with case
officers and Historic
Environment
Scotland when/as
appropriate to
ensure appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Historic Environment 
Scotland, East Lothian
Archaeology Service,
Developers 
No matters arising Ongoing monitoring
NRG1
Renewable and
Local Carbon
Energy Projects
Identifies support for
renewable energy and low
carbon technologies
in development proposals
and identifies criteria to
assess applications.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising Ongoing monitoring
NRG2
Wind Energy
Identifies the criteria wind
energy proposals must
satisfy including reference
to SG on wind energy
development.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service. 
Policy unused for
larger wind farms -
no determined
applications where
policy was used (a
wind farm
application
received in 2023 is
currently being
assessed)
Ongoing monitoring
Page 207 of 222

Page 208

Part 6 – Policy Actions 
Page 89 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
NRG3
Energy Use and
Low and Zero
Carbon
Generating
Technology
Encourages sustainable
energy use and requires
integration of low and
zero carbon generating
technologies into
developments.
Monitor planning
applications and
liaise with case
officers and Building
Standards Officers
as required to
ensure appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service. 
Developers
Consider Reporter
findings in relation
to need to connect
with heat network,
referenced in
Wellington School
appeal.  
Ongoing
monitoring. 
NPF4 and revised
Building Standards
have tended to
supersede this
policy, particularly
the more detailed
quantitative
elements in
associated policy
NRG3.
NRG4
Interpretation of
Policy NRG3
Provides definitions in
respect of policy NRG3 and
lists exceptions to it.
Monitor planning
applications and
liaise with case
officers and Building
Standards Officers
as required to
ensure appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Developers  
Consider ongoing
relevance in face of
higher building
standards and
NPF4.  
Ongoing
monitoring. 
NPF4 and revised
Building Standards
have tended to
supersede the
detailed
quantitative
elements in this
policy.  
NRG5
Heat Supply
Sources and
Development
with High Heat
Demand
Promotes the use of waste
heat from developments
and provides general
guidance on Council's
approach.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate advice
given.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Developers
Policy Unused Ongoing
monitoring. 
RERC at Shawfair
identified as the
principal heat
Page 208 of 222

Page 209

Part 6 – Policy Actions 
Page 90 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
generating source
for the proposed
community heating
network there
(NRG6).
NRG6
Community
Heating
Promotes the use of
community heating
networks.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate advice
given. 
Investigate and
implement
community heating
vehicles - e.g.
energy services
company – where
appropriate. 
Former action, to
adopt Community
Heating SG.  
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Midlothian Council
Resources Service
No matters arising Ongoing monitoring 
Midlothian Council
has formed a
partnership to
promote green
energy, including
waste heat from
RERC. 
No further action, in
line with decision
taken in DPS16 not
to adopt further SG
associated with
adopted MLDP.  
WAST1
New Waste
Facilities
Supports the development
of new waste facilities,
provides guidance on
locations and reinforces the
link to policy NRG5 in
respect of reusing waste
heat.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate advice
given. 
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Policy unused Ongoing monitoring
Page 209 of 222

Page 210

Part 6 – Policy Actions 
Page 91 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
WAST2
Millerhill
Safeguards site for waste
management facility at
Millerhill and supports
further waste-related uses
on the adjacent economic
land.
Monitor planning
applications and
liaise with case
officers and
representatives of
the waste
management sector
regarding future
opportunities.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
No matters arising AD and RERC
plants both now
operational
WAST3
Landfill
Reinforces the presumption
against new landfill
development and identifies
criteria to be met by any
landfill proposal.
Monitor planning
applications and
liaise with case
officers to ensure
appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Policy Unused - No
relevant
applications
(increasingly
unlikely there will
be)
Ongoing monitoring
WAST4
Operational
Waste Site
Safeguarding
Safeguards operational
waste sites from
inappropriate nearby
development.
Monitor planning
applications against
waste sites identified
in SEPA register,
liaise with case
officers and other
services as required.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Policy Unused - Not
spatially
referenced. Need
to consider if
enhanced as part of
a general
waste/industrial site
protection policy,
with sites indicated
in proposals map,
or if overtaken by
‘agent of change
principle’
Ongoing monitoring
Page 210 of 222

Page 211

Part 6 – Policy Actions 
Page 92 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
WAST5
Waste
Minimisation
and Recycling
in New
Developments
Provides support and
guidance for recycling
facilities and waste
separation facilities within
developments.
Monitor planning
applications and
liaise
with case officers to
ensure appropriate
advice given.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Developers
Policy Unused -
need to consider if
policy still required.  
Ongoing monitoring
IMP1
New
Development
Identifies the use of
planning conditions and the
possibility of developer
contributions to ensure that
where new development
gives rise to need,
appropriate provision is
made in respect of matters
specified in criteria. Also
promotes the use of
development briefs and
developers. Masterplans to
establish the planning and
design principles relating to
allocated sites.
Monitor planning
applications and
legal agreements,
liaise with case
officers, and other
services to assess
impact and progress
of planned,
committed and
windfall
development. 
Prepare masterplans
and development
briefs. 
Former action was
to review and
update Developer
Contributions SG. 
Monitor progress
through the
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Midlothian Council
Education Service 
Midlothian Council
Neighbourhood
Services 
Midlothian Council
Housing Service 
Midlothian Council
Resources, Legal and
Finance Services 
Developers
No matters arising Ongoing monitoring
Page 211 of 222

Page 212

Part 6 – Policy Actions 
Page 93 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
Council's Capital
Programming and
Asset Management
Board.  
IMP2
Essential
Infrastructure
Required to
Enable New
Development to
Take Place
Identifies the essential
infrastructure required to
support the delivery of the
development strategy in
tandem with IMP1.
Monitor progress via
developer
contributions
software, Capital
Programming and
Asset Management
Board. 
Report progress
through annual
National Planning
Improvement
Framework. 
Monitor planning
applications and
liaise
With case officers,
the Planning
Obligations Lead
Officer and other
services to assess
the impact of
planned, committed
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Midlothian Council
Resources, Legal and
Finance Services 
Developers 
Infrastructure providers
Concern that policy
is insufficiently
strong in terms of
requiring
commodious,
educationally sound
solutions where
costs are borne
wholly by developer
who has initiated
the change.  
Ongoing monitoring 
Annual update
Page 212 of 222

Page 213

Part 6 – Policy Actions 
Page 94 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
and windfall
development. 
Negotiate planning
obligations/other
legal agreements
where appropriate
and liaise with legal
services and
developers.
IMP3
Water and
Drainage
Indicates the approach
required by the Council to
support development
strategy.
Report progress
through annual
National Planning
Improvement
Framework. 
Maintain dialogue
with applicants and
Scottish Water
through pre-
application and
planning application
process. 
Engage with SEPA
and Scottish Water
at regular liaison
meetings. 
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Scottish Water
SEPA
No matters arising Annual 
Ongoing 
Ongoing 
Page 213 of 222

Page 214

Part 6 – Policy Actions 
Page 95 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
Former action was
to prepare and
adopt new SG on
Flooding and the
Water Environment. 
As reported in
DPS16 and decided
by Midlothian
Council no further
SG in connection
with the adopted
plan will be taken
forward.
No further action
IMP4
Health Centres
Supports the development
of new or expanded
facilities where there is an
identified need. 
Monitor planning
applications and
liaise with case
officers and
Midlothian Health
and Social Care
Partnership and
NHS Lothian to
ensure appropriate
conditions/controls
applied.
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
NHS Lothian 
Midlothian Health and
Social Care Partnership
Policy unused Ongoing monitoring 
Liaison with 
Midlothian Health
and Social Care
Partnership and
NHS Lothian
IMP5
Emergency
Services
Support the provision
and/or expansion of
services to meet growing
communities
Monitor planning
applications and
liaise with case
officers and
emergency
Midlothian Council
Planning, Sustainable
Growth and Investment
Service 
Emergency Services
Policy unused Ongoing monitoring
Page 214 of 222

Page 215

Part 6 – Policy Actions 
Page 96 
Policy Purpose Action Responsibility Observations in
respect of use of
Policy
Progress
services to ensure
appropriate
conditions/controls
applied.
Page 215 of 222

Page 216

Table 11: Status of Supplementary Guidance
Supplementary Guidance Status
Midlothian Green Network (SG) Adopted
Special Landscape Areas (SG)  Adopted
Resource Extraction (SG)  Adopted
Development in the Countryside and the Green Belt (SG) Adopted
Food and Drink and Other non Retail Uses in Town Centres (SG) Adopted
Low Density Rural Housing (SG)  Adopted
Nature Conservation (PG)  Adopted
Dalkeith Shop Front Design Guide (PG) Adopted
Dalkeith Townscape Heritage Initiative (THI) Adopted Homeowners Guide: 'Repair
and Maintenance of Historic Buildings in Dalkeith, Home Owners Guide' (PG)
Adopted 
19.  DPS16 approved by Midlothian Council’s Planning Committee in April 2024, states that the Council
does not intend bringing forward further Supplementary Guidance related to MLDP 2017. This
allows work to be focussed on the new LDP and reflects the changed planning policy context
brought about by NPF4.   
20.  National Developments.  Scottish Government guidance requires the Delivery Programme to help
facilitate national development, where relevant.  National Developments 5 (Urban Sustainable, Blue
and Green Surface Water Management Solutions for places including the Edinburgh City Region
and its water catchment areas), 6 (Urban Mass/Rapid Transit Networks for amongst other places
the Edinburgh City Region) and 7 (Central Scotland Green Network) have a particular geographic
locus relevance in Midlothian.  In addition, the following National Developments are described as
Scotland wide: 2 (Pumped Hydro Storage), 3 (Strategic Renewable Electricity Generation and
Transmission Infrastructure); and 4 (Circular Economy Materials Management Facilities), 8 (National
Walking, Cycling and Wheeling Network) and 12 (Digital Fibre Network).  National Development 18
(High Speed Rail) could conceivably affect Midlothian depending on route options chosen.   
21. The replacement Midlothian LDP will offer an opportunity to consider how these National
Developments can be delivered locally.  The geographically specific developments 5 and 6 are
already supported by the adopted plan, through policies TRAN2 and ENV10.  No apparent
incompatibility between the adopted MLDP and the NPF4 National Developments has emerged to
date.    
Page 216 of 222

Page 217

Midlothian Council
Tuesday 1 April 2025
Item No 8.6 
CCTV – Phase 1 Upgrade 
Report by Derek Oliver, Chief Officer – Place 
Report for Information 
1 Recommendations 
It is recommended that Council notes delivery of the upgrade to public
domain closed circuit television (CCTV) assets. 
2 Purpose of Report/Executive Summary 
This report outlines the delivery of the public domain CCTV upgrade
project, which was approved by Council in December 2021. 
Date:    10 March 2025
Report Contact:  Wayne Clark, Group Manager - Roads & Transportation 
Email:  Wayne.Clark@midlothian.gov.uk 
Page 217 of 222

Page 218

3 Background 
3.1 Midlothian Council’s public domain CCTV installations and assets are
the responsibility of Road Services, Street Lighting team. 
3.2 The previous CCTV assets were initially installed in 2006 and, with no
ongoing maintenance budget, had been degrading over more recent
years, eventually becoming inoperative.   
3.3 In December 2021, Midlothian Council approved the procurement and
installation of Multi-Sensor Cameras across Midlothian CCTV estate
and network, augmented by the procurement and use of re-deployable
wireless CCTV cameras, to be utilised at locations of interest or hot
spot areas for community safety and detecting/deterring anti-social
behaviour and environmental crimes. This required the addition of
£471,860 to the capital plan in 2021/22 and an addition to the annual
revenue budget of £97,622 from 2022/23.
3.4 Following extensive engagement with neighbouring authorities and
Police Scotland over the course of 2022, on 31st January 2023,
Midlothian Council’s CCTV contract was published on Public Contracts
Scotland and on 14 June 2023, the preferred contractor to deliver
CCTV public domain fixed asset upgrades was appointed.
Fixed assets
3.5 Within Bonnyrigg (8 units), Penicuik (8 units) and Dalkeith (14 units)
were upgraded in late 2023/early 2024.
3.6 In 2022, NHS Lothian removed relaxation of parking enforcement
towards staff which had been in place since the covid pandemic. This
resulted in a high volume of staff being displaced and forced to utilise
Sheriffhall park and ride, from where the NHS runs a chartered staff
bus. 
3.7 Through Winter 2023/24, Councillor and Police Scotland concerns
were raised with regards vulnerable user groups utilising the park and
ride, poor lighting, non-functioning CCTV and a significant uplift in
antisocial behaviour particularly by youths in modified cars.
3.8 In Summer 2024, investment was made at this site to resolve those
issues to include
➢ Installation of speed bumps
➢ Installation of improved LED lighting (contributing to energy
reduction)
➢ Installation of new, functional CCTV (9 units).
3.9 Project planning was also undertaken in summer 2024 for delivery of
Loanhead, Danderhall and Mayfield upgrades. These sites presented
engineering challenges due to historic hubs facilities for storage and
recording being disposed of, or demolished (Mayfield Leisure Centre,
Danderhall Library, Loanhead Police station). Assets are scheduled to
be upgraded by financial year end 2025. 
Page 218 of 222

Page 219

Re-deployable CCTV
3.10 The approved project also enabled expansion of deployable CCTV
assets (6 units) and the purchase of a CCTV mobile mast trailer, to
augment the existing 3 units.
3.11 These re-deployable assets are mobilised on both a proactive and
reactive basis and can undertake overt and covert surveillance. 
Deployment is based on priorities and in liaison with Police Scotland. 
CCTV in Operation
3.12 The recent upgrade to the CCTV system has significantly enhanced the
ability of Police Scotland to conduct investigations and improve
community safety. Below are some notable positive results achieved
through the use of the upgraded system:
i. Improved Investigation Capabilities: The upgraded CCTV system has
provided critical support in various investigations, enabling Midlothian
Officers to gather real-time evidence and make quicker, more informed
decisions.
ii. Enhanced Community Safety: With its expanded coverage, the CCTV
system has contributed to a safer environment for the community by
deterring criminal activity and aiding in the swift identification of
offenders.
iii. Support for Proactive Policing: Officers have been able to use the
upgraded CCTV system to monitor and respond to incidents more
effectively, resulting in a timely and well-coordinated police presence
throughout the area.
3.14 Below are some examples of when Midlothian Police Officers have
utilised the CCTV system:
i. High-Level Serious Organised Crime Group (SOCG) Activity in The
Lothians and Edinburgh: CCTV provided valuable evidence in the
investigation of serious organised crime group (SOCG) activity, helping
to identify the route, time, and vehicle descriptions involved in a crime
in Midlothian.
ii. Attempted Murder Investigation: Following a reported attempted
murder, the victim was unable to provide a description of the
perpetrator. CCTV footage proved to be a crucial tool in identifying the
suspect, who was subsequently located, arrested, cautioned, and
charged. 
iii. Serious Vehicle Collision: Officers monitored live CCTV footage during
an ongoing vehicle collision. This allowed Officers to quickly determine
the individual at fault and track their movements after leaving the
scene. As a result, the suspect was charged with driving under the
influence.
iv. Youth Anti-Social Behaviour Monitoring: CCTV has played an
instrumental role in identifying and addressing youth anti-social
behaviour in the community. Officers have successfully used the
Page 219 of 222

Page 220

footage to demonstrate to parents the activities their children have
been engaged in, fostering community awareness and accountability.
v. Stolen Vehicle Used in Housebreaking: A vehicle stolen from Fife was
used in a housebreaking in Midlothian. After the vehicle broke down on
Lauder Road, the perpetrators abandoned it. CCTV footage was pivotal
in identifying the suspects, leading to their subsequent arrest.
vi. Youth Vandalism: CCTV captured footage of youths throwing stones
and wielding hammers towards passersby in both King George V Park
and Bonnyrigg High Street. This evidence resulted in the youths being
identified, cautioned, and charged.
vii. Business Housebreaking: A report of a business housebreaking was
quickly addressed through the use of CCTV, which helped to identify
the suspects and the time of the offence, aiding in the investigation and
subsequently reporting the suspect to the PF.
viii. Vehicle Ramming and Police Assault: Officers responded to a vehicle
attempting to ram a police car, followed by a foot chase and multiple
police assaults. CCTV footage of the incident was crucial in
documenting the events for court proceedings.
ix. High-Risk Missing Person: A high-risk missing person report prompted
the use of CCTV to trace the individual's whereabouts, ensuring their
safe return and reducing the associated risks to their wellbeing. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource  
The Phase 1 project is anticipated to be completed within approved 
budget. The utilisation of the system has realised significant resource
efficiencies for both Midlothian Council and Police Scotland. 
4.2 Digital 
The Digital infrastructure and connections have been upgraded as part
of the Phase 1 project. 
4.3 Risk 
Although not a statutory function to provide a CCTV system, the failure
to address the deterioration and declining condition of the camera
estate increases risks for not aligning with public safety objectives.   
The investment in CCTV upgrades has therefore mitigated risk and
realised:
▪ Enhanced Public Safety 
▪ Faster response to emergency situations 
▪ Ease of crime investigation and evidence gathering 
▪ Real-time monitoring and incident response
Page 220 of 222

Page 221

▪ Discourages anti-social behaviour and promotes a sense of security
in public spaces
▪ Centralised fault monitoring and reporting 
A Phase 2 consideration will be reported to Council for expansion of
the CCTV network to other areas in Midlothian, in consultation with
Police Scotland. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
Having a properly maintained and operational CCTV system is vital to
Midlothian’s community safety. The subject of this report has a positive
impact in the environment and as such does not affect the wellbeing of
the community or have a significant detrimental impact on equality, the
environment or economy. 
4.5 Additional Report Implications 
See Appendix A 
Page 221 of 222

Page 222

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan
The route map outlines the phases of service recovery and
transformation which will underpin the Single Midlothian Plan. 
A.2 Key Drivers for Change
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value
The report aims to deliver best value. 
A.5 Involving Communities and Other Stakeholders
Consultation with Police Scotland has been imperative. 
A.6 Impact on Performance and Outcomes
The report aims to measure progress through outcomes. 
A.7 Adopting a Preventative Approach
The report is based on the creation of a wellbeing economy which
prioritises prevention, fairness for people, the economy and the