Democracy Spraffa

Agenda Document Pack - Cabinet - 30/05/2023

Midlothian Council · 30 May 2023
Back to Cabinet — 30 May 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Notice of Meeting and Agenda 
Cabinet 
Venue:  Council Chambers/Hybrid, 
Midlothian House, Dalkeith, EH22 1DN 
Date:  Tuesday, 30 May 2023 
Time:  11:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services 
Clerk Telephone: 
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk 
Page 1 of 258

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item
and the nature of their interest. 
4          Minute of Previous Meeting
4.1 Minute of Cabinet - 28 February 2023 for approval 5 - 10
4.2 Action Log 11 - 12 
5          Public Reports
5.1 22-23 Adult Health and Social Care Performance Annual Report
by Head of Adult & Social Care
13 - 22
5.2 22-23 Childrens Services Partnerships and Communities Annual
Report by Chief Social Work Officer
23 - 32
5.3 22-23 Corporate Solutions Performance Annual Report by Acting
Chief Officer Corporate Solutions
33 - 52
5.4 22-23 Education Performance Annual Report by Chief Operating
Officer Education
53 - 70
5.5 22-23 Place Performance Annual Report by Chief Officer Place 71 - 122
5.6 22-23 Midlothian Balanced Scorecard Indicators Annual Report 123 - 134
5.7 22-23 Midlothian Council Annual Report 135 - 142
5.8 Cherry Road Inspection Report by Head of Adult Services, Health
and Social Care
143 - 150
5.9 Burnbrae Primary School Inspection Report by Chief Education
Operating Officer, Children, Young People and Partnerships
151 - 160
5.10 Danderhall Primary School Inspection Report by Chief Education
Operating Officer, Children, Young People and Partnerships
161 - 166
Page 2 of 258

Page 3

5.11 Sacred Heart Primary School Inspection Report by Chief
Education Operating Officer, Children, Young People and
Partnerships
167 - 174
5.12 Protective Services, Environmental Health Food Service Plan
2023/24 Report by Chief Officer Place
175 - 220
5.13 Waste Services – Proposed application for external funding to
facilitate the introduction of kerbside collections of textiles and
small electrical appliances Report by Chief Officer Place
221 - 258 
6          Private Reports
6.1 Minute of Dalkeith High Education Appointment Committee of 7th
April 2022 by Chief Education Operating Officer, Children, Young
People and Partnerships
• 1. Information relating to a particular employee, former employee or
applicant to become an employee of, or a particular office holder, former
office-holder or applicant to become an office-holder under, the authority.
• 7. Information relating to anything done or to be done in respect of any
particular person for the purposes of any of the matters referred to in
section 27(1) of the Social Work (Scotland) Act 1968 (providing reports on
and supervision of certain persons). 
6.2 Minute of St Andrews Primary School Education Appointment
Committee of 30 June 2022 by Chief Education Operating Officer,
Children, Young People and Partnerships
• 1. Information relating to a particular employee, former employee or
applicant to become an employee of, or a particular office holder, former
office-holder or applicant to become an office-holder under, the authority.
• 7. Information relating to anything done or to be done in respect of any
particular person for the purposes of any of the matters referred to in
section 27(1) of the Social Work (Scotland) Act 1968 (providing reports on
and supervision of certain persons). 
6.3 Minute of Saltersgate School Education Appointment Committee
of 2nd March 2023 by Chief Education Operating Officer,
Children, Young People and Partnerships
• 1. Information relating to a particular employee, former employee or
applicant to become an employee of, or a particular office holder, former
office-holder or applicant to become an office-holder under, the authority. 
6.4 Minute of Bonnyrigg Primary School Education Appointment
Committee of 4th May 2023 by Chief Education Operating Officer,
Children, Young People and Partnerships
• 1. Information relating to a particular employee, former employee or
applicant to become an employee of, or a particular office holder, former
office-holder or applicant to become an office-holder under, the authority. 
6.5 Minute of Tynewater Primary School Education Appointment
Committee of 4th May 2023 by Chief Education Operating Officer,
Children, Young People and Partnerships
• 1. Information relating to a particular employee, former employee or
applicant to become an employee of, or a particular office holder, former
office-holder or applicant to become an office-holder under, the authority. 
Page 3 of 258

Page 4

6.6 Minute of Danderhall Primary School Education Appointment
Committee of 5th May 2023 by Chief Education Operating Officer,
Children, Young People and Partnerships
• 1. Information relating to a particular employee, former employee or
applicant to become an employee of, or a particular office holder, former
office-holder or applicant to become an office-holder under, the authority. 
6.7 Minute of Beeslack Community High School Education
Appointment Committee of 5 May 2023 by Chief Education
Operating Officer, Children, Young People and Partnerships
• 1. Information relating to a particular employee, former employee or
applicant to become an employee of, or a particular office holder, former
office-holder or applicant to become an office-holder under, the authority. 
7          Date of Next Meeting 
The next meeting will be held on 5 September 2023 
Page 4 of 258

Page 5

1-1  Cabinet
Tuesday 30 May 2023
Item 4.1  
Minute of Meeting 
Cabinet 
Date Time Venue
Tuesday 28 February 2023 10.00 am Council Chambers,
Midlothian House,
Buccleuch Street,
Dalkeith 
Present: 
Councillor Parry (Convener)  Councillor Bowen
Councillor Cassidy Councillor McKenzie
Councillor Scott 
Religious Representatives: 
Ms Elizabeth Morton 
In attendance: 
Dr Grace Vickers, Chief Executive
Kevin Anderson, Executive Director Place
Nick Clater, Head of Adult Services
Joan Tranent, CSWO & Chief Officer Children’s Services, Partnerships and
Communities
Derek Oliver, Chief Officer Place
Saty Kaur, Chief Officer Corporate Solutions (Acting)
Michelle Strong, Chief Operating Officer (Education) 
Alan Turpie Legal Services Manager/Monitoring Officer
Andrew Henderson Democratic Services Officer 
Item 4.1
Page 5 of 258

Page 6

1 Welcome, Introductions and Apologies 
Councillor Parry welcomed those in attendance to the meeting of Cabinet. Apologies
were then noted on behalf of Councillor Alexander and Ms Anne-Theresa Lawrie 
2 Order of Business 
The Order of Business was as detailed within the Agenda. 
3 Declarations of interest 
No declarations of interest were received. 
4 Minutes of Previous Meetings 
4.1 The Minute of the Meeting of the Cabinet held on the 29 November 2022 was
submitted and approved as a correct record. 
4.2 The Action Log of Cabinet was submitted and noted. 
5.  Reports 
Agenda No. Report Title Presented by:
5.1 Inspection of Midlothian Council’s Young
People’s Care Home 
Chief Executive
Outline of report and summary of discussion
Grace Vickers provided a brief overview of the report making reference to the
improvements made referencing to the grades attained and took the opportunity to
pass on her thanks as head of paid services. Members took the opportunity to echo
the comments of the Chief Executive and agreed to note the report. 
Decision
Cabinet noted the content of the report and progress made and agreed to forward
the report to the Performance Review and Scrutiny Committee. 
Agenda No. Report Title Presented by:
5.2 Adult Health and Social Care
Performance Report Quarter Three
2022/23
Head of Adult Services
Outline of report and summary of discussion
Nick Clater provided a brief overview of the Adult Health and Social Care
Performance Report Quarter Three 2022/23 making reference to seasonal
Flu/Covid booster programs, unpaid work, substance misuse, staffing challenges,
Mental health, Sport and Leisure and further outlined the challenges and risks. Nick
Clater then took the opportunity to respond to members questions. 
With regard to the retention of social workers, Nick Clater confirmed that whilst
Page 6 of 258

Page 7

retention levels are good, recruitment into mental health and old age is challenging
and that work is being undertaken to look into this. Joan Tranent made further
reference to national trends and work with social work Scotland. 
A discussion ensued with regard to service provision within substance misuse. Nick
Clater acknowledged that improvements are required with regard to access to
treatment and with work being done with the third sector partners to look into
possible capacity building. Nick Clater also acknowledged that there was a
continued uptake in relation to alcohol issues and assessment was going with
regard to possible staffing recourse to address this. Nick Clater further highlighted
a lack of nursing staff and outlined that further work was being conducted to assess
the possibility of transferring certain tasks to Social Workers and Community Care
Assistants. 
Nick Clater agreed to update members with regard to the possibility of existing
users of Midlothian Sport and Leisure cards to access facilities at Hillend. 
Decision
A) Nick Clater agreed to update members with regard to the possibility of
existing users of Midlothian Sport and Leisure cards to access facilities at
Hillend; and 
B) Cabinet noted the contents of the report. 
Agenda No. Report Title Presented by:
5.3 Children Service, Partnership and
Communities Performance Report
Quarter Three 2022/23
CSWO & Chief Officer
Children’s Services,
Partnerships and
Communities
Outline of report and summary of discussion
Joan Tranent provided a brief overview of the Children Service, Partnership and
Communities Performance Report Quarter Three 2022/23 making reference to
recruitment, arrival of Ukrainian families, unaccompanied asylum seeking children
and financial pressures. Joan Tranent then took the opportunity to respond to
members questions. 
A discussion ensued in relation to the risk of unaccompanied asylum seeking
children going missing, Joan Tranent confirmed that records are maintained and
safeguards are in place to minimise the risk of unaccompanied asylum seeking
children going missing. 
Further discussion ensued in relation to the 7% increase in child referrals. Joan
Tranent clarified that the majority of referrals are finance related and that a staff
member had been recruited to screen applications. Joan Tranent also confirmed
that data could be collected regarding referrals providing further insight. 
Decision
Cabinet agreed to note the contents of the report. 
Page 7 of 258

Page 8

Agenda No. Report Title Presented by:
5.4 Corporate Solutions Performance Report
Quarter Three 2022/23
Chief Officer Corporate
Solutions (Acting)
Outline of report and summary of discussion
In speaking to the report, Saty Kaur made reference to work undertaken with
regard to the budget and medium term financial strategy. Saty Kaur also made
reference to the hybridisation of the council chamber, customer service platform,
crisis grants and warm and well hubs. Saty Kaur then took the opportunity to
respond to points of clarity. 
In response to comments regarding contact centre complaints not being picked up
by services, Saty Kaur confirmed that work was being conducted internally,
including the implementation of a new complaints module within the customer
service platform which will allow better tracking of complaints and responses
allowing for pinpointing of challenges. Saty Kaur outlined that the customer service
strategy is being refreshed to focus on supporting vulnerable customers and that
work is being undertaken in hubs and libraries to create a first point of contact
approach. Saty Kaur confirmed that the implementation period for the customer
service platform was ongoing and that the ‘contact us’ complaints feature is
scheduled for the beginning of April. Councillor Parry, seconded by Councillor
McKenzie then took the opportunity to offer Cabinets thanks to the Council’s twitter
help team.   
A discussion ensued in relation to welfare grants. Saty Kaur confirmed that those
who are refused welfare grants are signposted to alternatives including food
parcels, alternative funding and DWP grants. Saty Kaur also highlighted that
refusals are signposted to trusted partners in addition to other initiatives including
welfare rights and income maximisation. 
In response to comments regarding the mixed footfalls at warm and well hubs, Saty
Kaur confirmed that work is being done to communicate the location of warm and
well hubs in addition to reducing the stigma of use and that additional consideration
was being given to the opening of hubs in Danderhall and Lasswade. 
Further comments were raised in relation to the possibility of separating payments
into set streams. Saty Kaur confirmed that discussions regarding this are ongoing
with regard to how this can be facilitated. 
Decision
a) Cabinet offered it’s thanks to the twitter help team for it’s work in responding
to customer queries; and
b) Noted the contents of the report. 
Agenda No. Report Title Presented by:
5.5 Education Performance Report Quarter
Three 2022/23
Executive Director
Children, Young People
and Partnerships
Outline of report and summary of discussion
Michelle Strong provided a brief overview of the Education Performance Report
Quarter Three 2022/23 making reference to service improvement priorities and
outlined further work to be completed regarding response to complaints and
attendance with the aim to see improvement in quarter four. 
Page 8 of 258

Page 9

In response to comments regarding to attendance and the impact of strike action
and the impact on student mental wellbeing, Michelle Strong confirmed that there is
a 13.8% difference in attendance to pre pandemic levels but that there is a 21.3
variation in the secondary sector and that work is being undertaken to drill into the
variations across different schools in addition to work being undertaken with
officers, head teachers and support services to ascertain whether nonattendance
was habitual or a result of barriers to engagement. 
A discussion then ensued in relation to the mental wellbeing of learners and the
impact on attendance and exclusions Michelle Strong acknowledged the continued
presence of more distressed behaviours amongst learners compared to pre
pandemic and highlighted that work is being undertaken to ascertain how learners
can be best supported. Michelle Strong further outlined the importance of using
local and national data to support improvement around attendance, exclusions, the
reporting of incidents. 
In response to comments regarding ‘future classroom’ Michelle Strong confirmed
key priorities around the development of the curriculum to ensure that learners are
provided with the best opportunities and that work is being linked to the equipped
for learning program and highlighted that further information would be reflected in
quarter four. 
Decision
Cabinet noted the contents of the report. 
Agenda No. Report Title Presented by:
5.6 Place Performance Report Quarter Three
2022/23
Chief Officer Place
Outline of report and summary of discussion
In speaking to the Place Performance Report Quarter Three 2022/23 Derek Oliver
made reference to building standards service, building maintenance services,
property and facilities management, neighbourhood services, planning and
economy, and protective services. Derek Oliver then took the opportunity to
respond to points of clarity. 
There was a brief discussion in relation to the possible use of pre-payment meters.
Derek Oliver confirmed that pre payment meters are not being considered whilst
acknowledging some issues with energy companies impacting the turnaround time
for voids and that work was ongoing to streamline this. With regard to properties
that had a pre-payment meter installed, Derek Oliver confirmed that these could
not be removed and continued to provide a brief overview of the process that is
undertaken when transferring between tenants. 
Further discussion ensued in relation to the improvements made to void
turnarounds. Derek Oliver confirmed that the bulk of the work is undertaken in
house and confirmed that staff retention within building maintenance services is
good. 
Decision
Cabinet noted the contents of the report. 
Page 9 of 258

Page 10

Agenda No. Report Title Presented by:
5.7 Midlothian Council Report Quarter Three
2022/23 
Chief Executive 
Outline of report and summary of discussion
Grace Vickers provided a brief overview of the Midlothian Council Report Quarter
Three 2022/23 making reference to progress against strategic outcomes,
achievements, challenges and risks. Grace Vickers then offered to respond to
members' questions. 
Decision
Cabinet noted the contents of the report. 
6 Private Reports 
In view of the nature of the business to be transacted, the Cabinet agreed that the  
public be excluded from the meeting during discussion of the undernoted item, as 
contained in the Addendum hereto, as there might be disclosed exempt information
as defined in paragraph 6 of Part I of Schedule 7A to the Local Government
(Scotland) Act 1973:- 
Agenda No Report Title Presented by:
6.1 Irrecoverable Debt Write-Off Chief Officer Corporate
Solutions (Acting)
Decision
Cabinet authorised write-off to a total value of £328,744.84 for the irrecoverable
debts
• Appendix B (Housing Rent Former Tenants) amounting to a total of
£124,940.52 
• Appendix 2 (Non Domestic Rates) amounting to a total of £105,267.90 
• Appendix 3 (Sundry Debt) amounting to a total of £98,536.42 
7 Date of the Next Meeting 
The date of the next meeting was noted as Tuesday 18 April 2023 at 11 am. 
The meeting terminated at 11:35am
Page 10 of 258

Page 11

Cabinet: Tuesday 18 April 2023 
Action Log 
No Subject Date Action Action Owner Expected
completion
date
Comments
1 Adult Health and
Social Care
Performance Report
Quarter Two 2022/23
28/02/2023 Nick Clater to provide update
to members with regard to the
possibility of using existing
Midlothian Leisure Cards to
access facilities at Hillend. 
Head of Adult
Services 
Q3 2023/24  Lead appointed to review S&L
charges. Briefing meeting held
on Friday 12th with completion
end of June/beginning of July.
Full details will be presented to
the Council. 
Review of memberships and
possible inclusion of Hillend will
be determined after review.  
Hillend not part of this review
(current business cases
already reviewed by external
company).
2 Place Performance
Report Quarter Three
2022/23
28/02/2023 Clarification to be provided in
relation to LACER funding
streams as outlined in the
report in advance of PRS. 
Chief Officer
Place
14/03/2023  Complete - Funding Streams
detailed in Q4 report 
Cabinet
Tuesday 30 May 2023
Item No: 4.2 
Item 4.2
Page 11 of 258

Page 12

Page 12 of 258

Page 13

1
Adult Health and Social Care
Performance Report 2022/23 
Progress in delivery of strategic outcomes
Our Vision: People in Midlothian are enabled to lead longer and healthier lives. 
Our Values: Right support, right time, right place. 
Midlothian Integration Joint Board plan and direct the services that are delivered by Midlothian Health and Social
Care Partnership (HSCP). The HSCP is a partnership between NHS Lothian and Midlothian Council and is
responsible for services that help Midlothian residents to live well and get support when they need it. This includes
all community health and social care services for adults in Midlothian and some hospital based services such as
Accident and Emergency. 
In order to meet the legal requirements of the Public Bodies (Joint Working) (Scotland) Act 2014, the HSCP was
required to develop, consult on, and publish a new 3 year Strategic Plan in 2022. The new Strategic Plan for 2022-
25 was published in April 2022. 
HSCP COVID-19 Response: The Health and Social Care Partnership, its partners and the communities it services
continued to be impacted by the ongoing effects of the COVID19 pandemic. A recent spike in infections over the
winter months coupled with Influenza cases has caused significant pressure on our workforce due to absences. The
Health and Social Care Partnership has maintained delivery of services and continues to work with its partners to
ensure resources are being managed and deployed to cover staff absences where needed. The partnership
continue to deliver the vaccination programme across sites in Midlothian. Midlothian Community Hospital have seen
a return in face-to-face outpatient clinics. More recently, guidance around PPE has been further relaxed and there
has been an indication from the World Health Organisation (WHO) that, “with great hope”, the pandemic is at an
end. 
Seasonal Flu/COVID Booster Programmes:  The Midlothian Vaccination Team have responsibility for all
vaccinations; Seasonal Flu, all covid vaccines, shingles and pneumococcal and all unscheduled vaccines that were
part of the Vaccination Transformation Programme from the GPs to the HSCP. 
The Autumn/Winter 2022/23 Vaccination Programme for Flu and Covid boosters concluded on 31st March 2023. As
of 31st March 2023, the uptake of flu vaccines for adults administered in Midlothian HSCP is 71% for Flu vaccines
and 70% for Covid Booster vaccines. 
The Community Vaccination Team continue to deliver the school flu programme and the 0-5 immunisation team
deliver the 2-5 year flu programme with a 61% uptake on 31st March 2023. 
Shingles and Pneumococcal vaccinations – as of 31st March 2023, Shingles vaccination uptake for Midlothian is
82% and the pneumococcal vaccination uptake for Midlothian is 78% with some second offers outstanding. This will
be picked up following the spring booster vaccination programme. 
The Spring Covid Booster Vaccination Programme commenced on 27th March 2023. The first two weeks have been
dedicated to Care Home and House Bound patients. All eligible cohorts thereafter, 75+ and those 12+ with
Weakened Immune Systems (WIS), have been invited for their vaccinations across 3 venues from 11th April 2023 –
Midlothian Community Hospital, Rosewell Steading and Dalkeith Medical Practice. 
As part of the ongoing inclusivity plan and to promote further uptake in line with the Scottish Government, Pop-up
vaccination clinics have taken place to target areas of deprivation, areas of lower uptake, residents in homeless
accommodation, those with substance misuse and those involved in the Criminal Justice System. These venues
include: IKEA Edinburgh, Mayfield Community Big Dig event, local Ukrainian coffee morning, Dalkeith Library/Arts
Centre and Warm Hubs in Midlothian, separate clinic sessions were held inviting individuals in homeless
accommodation and Learning Disabilities teams continue to support with vaccinating their patient who are unable to
attend clinics. 
Item 5.1
Page 13 of 258

Page 14

2 
Service Transformation:  Whilst there remains some pause on the work to develop a National Care Service,
discussions continue around the preparation required at both Chief Social Work Officer meetings and other Social
Work Scotland fora. 
It should be noted that both COSLA and Social Work Scotland have requested that the Scottish Government pause
on the Bill pending further consultation. Notice was provided in March 2023 that there would be a pause in NCS
progression pending the outcome of the election of a new First Minister.  It had been anticipated that work would re-
start in June 2023 but the new Minister for Social Care, Wellbeing and Sport, Maree Todd, has indicated that the
debate may be pushed further back in the timetable. 
Justice: The Justice Team have continued to deliver a range of interventions that fulfil our statutory requirements,
despite managing a number of vacancies throughout the financial year. This has included making progress to
implement the national outcomes outlined in the Scottish Government’s Vision for Justice in Scotland.  To ensure
that we are able to provide early interventions at the Court stage we continue to liaise with colleagues locally and
nationally to enable us to offer and provide a range of bail services to those resident in Midlothian.  As evidenced by
the updated performance measures we have made good progress against the performance indicators, despite
workforce pressures and this has been supported by close partnership working to ensure that we can achieve
positive outcomes for service users.   
Throughout the 2022-2023 financial year the Community Justice and Safety Manager has continued to work with
partner agencies (statutory and third sector) to deliver the outcomes in the 2020-2023 Community Justice Outcome
and Improvement Plan (CJOIP) and to develop the forthcoming 5 year plan (2023-2028).  The importance of
communicating and increasing awareness and understanding of Justice and Community Justice was highlighted and
during 2022-23 financial year and we worked in collaboration with media students at Edinburgh College (Dalkeith
Campus) to raise awareness around the issues on topics including Hate Crime, Masculinity, Restorative Justice and
Violence against Women and Girls.   The project culminated in the students producing short videos highlighting the
issues which were showcased at an event on 21st February 20203.  This prompted detailed and positive discussions
allowing sharing of knowledge & expertise between the students, professionals and others in attendance.  In addition
the event allowed opportunities for discussion on gaps that Midlothian Council and partners could address in the
coming years to address issues and concerns together with establishing and developing partnership  Feedback from
the event was extremely positive with partner agencies keen to build on the work undertaken to inform learning and
development within their own organisations.   
Substance Misuse: Key services based in Number 11 in Dalkeith continued to provide services including outreach
treatment, injecting equipment provision (IEP), Naloxone, and information/advice. Currently, there are challenges
with recruitment. However, the Midlothian Substance Use Service continues to support and treat those individuals
who are most at risk. This includes the provision of Buvidal (an injectable form of Buprenorphine). 
MELDAP is in the top six ADPs in terms of the uptake of Buvidal. The national uptake is 12.5% while the MELDAP
figure is 25%. 
MELDAP has been advised of a provisional Green rating for Medication Assisted Treatment (MAT) Standards 1-5.
MAT 1 included improved access and starting treatment on the same day as presenting. For Q4 the waiting times
performance was 95%. (National standard is 90%). Midlothian is well placed to deliver MAT Standards 6 -10 by the
March 2024. The Scottish Government predicts a rating of amber for these standards. This is due to the fact that
Scottish Government have yet to confirm the processes and measurements associated with the delivery of these
standards. 
Learning Disabilities: Finance and Performance Group approved the recommendations of the Complex Care
Expert Panel for allocation of the Community Change Fund. The key spending priorities are the recruitment to a
Transition Development Worker, Improvements to Day Service Venues for people with Complex Needs, A Positive
Behavioural Support Training Programme and grants to third sector organisations. 
The Human Rights Expert Panel has completed its first programme of activity and has now agreed a programme of
two monthly meetings for the remainder of 2023. 
Building work has started on the flats at Bonnyrigg High Street and is scheduled for completion in June 2024.
Designs for Primrose Lodge in Loanhead are complete, and the property is now vacant. A reapplication for capital to
Page 14 of 258

Page 15

3
fund the project was refused, and alternative sources of funding are being sought. Renovations at Teviot Court are
now complete with the exception of some outside groundwork that should not affect tenants. 
Numbers on the Learning Disability waiting list remain constant. Cases are prioritised based on urgency and the
figures will mask the turnover of cases on the waiting list or cases that have been allocated immediately. The waiting
list is regularly reviewed for any change in circumstances that will require immediate allocation.  
Older People: Care at home: Our internal and external providers delivered 68,765 planned hours of care during this
quarter. Our internal Care at Home service delivered 35% of the planned hours, and a total of 56,537 visits across
Midlothian. A new Resource Manager was appointed and face to face meetings have been held with carers in each
area, jointly with Union partners. Staff feedback and engagement has helped with the development of a Service
Improvement Plan. Learning and Development continues to be a significant focus, with the opening of the new
training suite at Hardengreen offering a local space to facilitate Moving and Handling training. 
Carers: Unpaid carer management oversight changed to Service Manager Disabilities at the start of Q4. Work
during Q3 to produce a business case and plan committing available recurring and underspent Carers Act funding
continued during Q4, but the change in manager allowed the opportunity for a status check on HSCP internal
funding utilisation and commitment. Carers Act funding is ring-fenced, but recognition is being given to the impact on
carers and services of the wider Council/HSCP budgetary situation. Head of Adult Services has been apprised of
carer funding proposals, and is working with the Service Manager and Carer Planning Officer regarding a
transparent and collaborative decision making process regarding the commitment of available funds. 
The Carer Planning Officer is in discussion with Alzheimer Scotland senior managers regarding the Dementia Carer
Support Practitioner post. Identification of an HR issue has resulted in changes to the original /person specification,
but this is resolved and can hopefully result in the post being advertised as soon as possible. 
Mental Health: Primary Care 2022 Action 15 developments continues to be postponed still awaiting update from
Scottish Government. 
Individual Placement Support Occupational therapist post has been recruited into and commenced and has a triage
referral caseload of 25 individuals. During Q4 up until the IPS OT commenced post it’s important to note that the
core Adult Mental Health OT service has been able to support the following individuals: Employment (14),
Volunteering (3), and Education (17). 
Continued Strong partnership working continues between Housing, Health and Social care with third sector.
Providing support for individuals with complex needs, through the housing first model. 
The current local Adult Mental Health Social Work Team/Mental Health Officer team comprises 4 full time Mental
Health Officers (MHO), 2 trainees currently out of practice and 1 part time social worker. The team is currently
progressing with the recruitment of 1 further Social Worker for the team. 
Over the last year there have been various challenges in relation to workforce pressures and recruitment of MHOs.
Locally we identified the need to support further development, training and retention of MHOs within the current
Midlothian Social Work teams, thus enhancing the capacity to address both the Mental Health Social Work waiting
list and the Welfare Guardianship Order waiting list. 
As a service we addressed these challenges through the review of the current waiting list at the time, identified the
local Social Work staff who were appropriate to progress with MHO training as well as having the opportunity to
invest further through additional monies the recruitment of a 1 wte permanent Social Worker for the team.  We were
also able to proceed with the recruitment and support of one agency MHO and one casual MHO to support with
progressing and reducing the Welfare Guardianship Order waiting list. 
Over 2022/2023 we have successfully made a significant impact on our waiting list from 60 individual's waiting for
MHO report to current waiting list being 18. 
We are hopeful that once our current MHO trainees are back in practice and the new Social Worker is in post, we
will be able to maintain a minimal waiting list and be reactive to WGO's, as a service we will continue to monitor the
demand and waiting list on a monthly basis. 
Page 15 of 258

Page 16

4
Adults with Long Term Conditions, Disability and Impairment: Awareness training sessions for relevant HSCP
staff, provided by Sight Scotland are being delivered, starting in June 2023. Sight Scotland continue to provide
information sessions to staff in relation to the services they provide and report back on the people they have worked
with. They continue to reduce waiting lists for people requiring their service, which is offered in their community and
evidence this through quarterly reporting. 
Deaf Action now have a qualified Social Worker in place who has actively engaged with Social Work and Physical
Disabilities Teams within the Partnership. A review of work being undertaken by CCA’s at Deaf Action has taken
place jointly with the Physical Disabilities Team. 
Volunteers continue to uplift peoples’ faulty hearing aids from their homes and deliver the aids to Midlothian
Community Hospital for an Audiology technician to repair, and then return the repaired aids back to the individuals.
Specially trained staff are also able to repair hearing aids for people on the same day. This service is offered both by
HSCP and Red cross staff. There has been no active movement in terms of re-introducing Community Audiology
Clinics as there has been no communication from the Audiology Service, despite several attempts. 
The Physical Disabilities Team and Long Term Conditions Team is currently part of a joint project with the Thistle
Foundation which aims to improve support provided to someone who has Neurological Condition. This is due to be
evaluated in the Autumn. The Service is also in the process of reviewing its Guidelines for the provision of Aids and
Adaptations with the aim that this document can be shared with members of the public to help them understand
better the role and remit of the Service 
Hybrid model up and running for delivery of face to face and digital for all weight management programmes. Digital
devices secured for people referred so they are able to decide what options best suits their needs Improving. 
Sport and Leisure: The Sport and Leisure Service Review is nearing completion and the new structure will be
implemented from early 2023/24. Vacancies remain in the service and recruitment is continuing for these. 
ToneZone Memberships have increased from 4103 at the start of the quarter to 4346 at the end of Q4. 
On return form Covid we had 3570 memberships which currently sits at 4346 (1796 less than pre Covid) however up
776 since reopening. 
Factors influencing a decline in retuning customers include: 
• post Covid training habits – more people are inclined to use the outdoor spaces;
• delayed access in returning to facility of choice (specifically Lasswade and Newbattle);
• current cost of living;
• alternative gyms opening in the Midlothian and outside Midlothian. 
The management team in Sport and Leisure are working hard to identify opportunities to increase participation,
membership and income and these include:
• A Tone Zone marketing plan (£0 costs involved) is available – initiatives include reduced joining and
membership fees, a focus in December on fitness, free months;
• Promote all our offerings on social media platforms and via the Council Communications team regularly (43
posts about classes, 70 posts about individual centres and operational matters, 13 posts about offers such
as joining fees, 20 general media type posts such as success of Ageing Well initiatives, Destination Hillend
updates and Walk the Line calls for entries);
• We also promote through Active Schools (April 23) 15 tweets, 17.4K tweet impressions, 544 visits, 24
mentions and 3 new followers. 
Project work
We continued to undertake various project work including:
• CLLE: we have continued to work in partnership with CLLE to offer opportunities to identified young people
and families; 
• Daily Mile: We are continuing to work on promoting and providing support for schools to deliver this;
• Cycle fund: We have received £7522 from Scottish Cycling to purchase some bikes and organise training to
allow us to deliver more cycling sessions and make cycling more accessible to all. We plan to apply for year
2 funding to expand this programme to allow us to take a more targeted approach;
Page 16 of 258

Page 17

5
• Kit for All: we have continued to develop this with Young Ambassadors driving this project. They are
currently promoting the project and coordinating donation and collection of kit. This is currently running in 3
areas, with plans to expand into others. 
Secondary Schools
Work in our Secondary Schools continues:
• Young Ambassadors: Our young ambassadors have worked on various projects this term including kit for all,
inter house events, Active Girls events & promotion and organisation of Lasswade Sports Personality event;
• Fit for Girls (FFG) – our existing and new FFG group attended a workshop delivered by national trainers to
help with planning and development of our FFG work in Midlothian.   
Page 17 of 258

Page 18

6 
Challenges and Risks
COVID-19: The Health and Social Care Partnership, its partners and the communities it serves
continued to be impacted by the COVID 19 pandemic. The Health and Social Care Partnership has
maintained delivery of services and continues to work with its partners to ensure resources are being
managed and deployed to cover staff absences where needed and continue to develop our
remobilisation plans. We continue to work to ensure key staff receive both the Covid and flu vaccine.
The winter covid 19 vaccination programme has been completed, with plans for the spring booster
programme by cohort groups planned to commence 27 March 2023 
A growing and ageing population: Midlothian is the second smallest Local Authority in mainland
Scotland but the fastest growing. This will continue to pose challenges for health and social care
services whilst also changing some local communities. As people live for longer many more people
will be living at home with frailty and/or dementia and/or multiple health conditions. An increasing
number of people live on their own, and for some this will bring a risk of isolation. We have invested
further in providing post-diagnostic support to people living with dementia in their own homes,
particularly to those newly diagnosed. We are working hard to ensure all people diagnosed with
dementia have access to a link worker for the first year post-diagnosis 
Higher rates of long-term conditions: Managing long-term conditions is one of the biggest
challenges facing health care services worldwide, with 60% of all deaths attributable to them. Older
people are more susceptible to developing long-term conditions; most over 65s have two or more
conditions and most over 75s have three or more conditions. People living in areas of multiple
deprivation are at particular risk with, for example, a much greater likelihood of early death from
heart failure. They are also likely to develop 2 or more conditions 10-15 years earlier than people
living in affluent areas. Our Community Treatment and Assessment centres (ctac) continue to
develop within our localities linked to our GP practices. We provide phlebotomy services Long term
condition monitoring, wound management in our CTAC clinics. We plan to collaboratively develop a
digital platform that engages people to access preventative support with activities of daily living
(ADLs) using the LifeCurve platform to empower people to feel more in control of their own health
and wellbeing. This will bring together learning and insights from several projects including the
Neurological Conditions project, the Long Covid Pathway and the Integrated Falls Pathway which
aim to target support for the wellbeing and symptom management of those living with long term
conditions in Midlothian. 
Higher rates of mental health needs: Many mental health problems are preventable, and almost all
are treatable, so people can either fully recover or manage their conditions successfully and live
fulfilling healthy lives as far as possible. The incidence of mental health issues in Midlothian, while
similar to the rest of Scotland, is a concern. Living in poverty increases the likelihood of mental
health problems but also mental health problems can lead to greater social exclusion and higher
levels of poverty. People who have life-long mental illness are likely to die 15-20 years prematurely
because of physical ill-health. Alongside more established nursing and social work services,
Midlothian HSCP established the Mental Health and Resilience Service (MHARS) in August 2022.
This is a 7-day per week telephone service people can access for advice and support around how
they can better manage their mental health. It is self-referral and there are a range of options
available post-telephone call. 
Our services are under pressure: People place a high value on being able to access effective
health services when they need them. People expect to receive high quality care services when
these are needed whether as a result of age, disability, sex, gender or long term health conditions.
Yet there are a number of pressures on our services. For example, we have particular pressures
regarding transitions of young people with learning disabilities from childrens’ to adults’ services. 
Financial pressures Financial pressures on public services are well documented. There is no doubt
that we need to do things differently: the traditional approach to delivering health and care services is
no longer financially sustainable. We have particular pressures in our disability services with
challenges to meet complex needs in the community when in the past care settings may have been
considered. In working through the IJB budget for 2023-24, we are beginning to look at how we can
make efficiencies. It is likely that difficult choices may have to be made. 
Page 18 of 258

Page 19

7
Transitions from Children’s Services There is a specific pressure regarding the transition of young
people from children’s’ to adult services (mainly with learning disabilities). There is an increasing
number of young people meeting eligibility criteria for support and the number of you people with
particularly complex needs also increasing. In additional to the overall financial pressure of increased
support provision by adult services there are challenges related to improving the experience of
transitions, Improvement work is being progressed to improve multi-agency practice in relation to
transitions and embed the newly developed Principles of Good Transitions. Specific ring-fenced
Learning Disability funding will be used to recruit a development worker who will be tasked
specifically taking forward this work related to improving the transition pathway. 
Workforce pressures The Covid-19 pandemic has and will continue to influence the demand for,
and deployment of, the health and care workforce for the foreseeable future. There is reduced
availability of staff with appropriate qualifications or skills, including General Practitioners, Social
Care Workers and Staff Nurses. This impacts on service delivery and development. Whilst we
continue to attempt recruitment, we acknowledge that some areas remain stubbornly difficult to
recruit to. To offset this, where we can, we look to change workforce skills mix but this is not always
feasible. 
Our Lothian wide clinical education plans have been developed to respond to the need to develop
numbers of staff working at and Advanced Practice level in nursing and AHP as part of the approach
to orienting the whole system to meet modern challenges, thus enabling GPs focus on more
complex work by developing the skills of the nursing and AHP workforce to undertake diagnosis and
prescribing. Midlothian currently has a Pharmacy team that is fully established and has a recent
history of successful recruitment. This team is deployed in GP practices supporting the principles of
the 2018 GMS contract focussing on delivery of Pharmacotherapy, within the limits of the current
funding allocation. Practice pharmacy teams have discussions with patients daily to ensure the
safest and most appropriate use of their medicines. 
Unpaid carers Unpaid carers fulfil significant, valuable and wide-ranging roles within Midlothian
communities, helping to keep people with care and support needs within our communities. During
the pandemic many people became carers for the first time, or saw changes to their caring role,
resulting in them providing significantly more care for their elderly, sick or disabled family, friends
and neighbours. Through this period services supporting carers continued to offer a range of
support, including digitally, and by telephone, though services supporting the person they provide
support to may have been reduced, e.g. respite and day services, impacting on carers. Further work
is required to reduce the significant pressure and impact of caring that carers reported, by continuing
to explore innovative options to enable support to be given to both carers and the cared-for, and for
there to be opportunities for breaks from caring. We are currently working with key stakeholders to
determine how best to allocate the resources we have for unpaid carers. We are particularly keen to
see an increase in capacity of respite opportunities for both individuals and their carers. 
Acute hospitals Acute hospitals are under huge pressure due to unsustainable demand and
financial restrictions. Investing in community based services and work with carers is required to
minimise avoidable and inappropriate admissions and facilitate earlier discharge. By treating people
closer to home, or in their own home the HSCP can support admission avoidance and improve
people’s outcomes. Winter has seen a consistent pressure at the front doors of our hospital sites
across Lothian. Midlothian HSCO community services are focusing on flow through the hospital and
have invested in an umbrella of community services to embed our Home First model of care delivery.
Community Respiratory Team, Rapid response team, district nursing, care at home services have
been supported to increase capacity to sustain support to those within community and avoid hospital
admission.   
Page 19 of 258

Page 20

8  Page 20 of 258

Page 21

9  Page 21 of 258

Page 22

Page 22 of 258

Page 23

1 
Children's Services, Partnership and Communities 
Performance Report 2022/23 
01. Progress in delivery of strategic outcomes 
Item 5.2
Page 23 of 258

Page 24

2 
Page 24 of 258

Page 25

3 
Page 25 of 258

Page 26

4 
01. Progress in delivery of strategic outcomes
GIRFEC Service Priority: More children and young people are safe, healthy and resilient 
Priority Action 1: Develop a Midlothian Whole Family Support Service 
Progress and Achievement in Q4
• The team are in place however still a significant amount of development work to be undertaken to
ensure we are utilising the service towards holistic family support at the earliest point of contact. 
Plans for improvement next year ahead
• Undertake a full review of 3rd sector support which will be available to enhance this service so that we
have a menu of options of support for families 
• Ensure that we have a self evaluation plan in place that will evidence the impact of supporting families
at the earliest point of access
• Develop a single point of access 
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2  Q3  Q4
Funding and resources
are in place for 23/24  31/03/23 New Measure 0  12 staff
recruited
All staff in
place
All
staff in
place 
Priority Action 2: Increase the number of families who benefit from Family Systemic work 
Progress and Achievement in Q4
• Achievements being that workers are now trained in NVR (non-violent resistance) and beginning to
support parents using coaching methods in NVR.
• Continue to manage the waiting list to keep it to a minimum
• Support to help families to improve relationships and communication. Feedback from family- ‘it was
better than I expected as I want sure what to expect… it was bringing the family together, identifying
ideas for helping, feeling heard.’ 
Plans for improvement next year ahead
• Currently writing an update on the benefits of having a second worker in systemic work. However
uncertainty exists about whether this post will retained or the person will return to their substantive
post.
• Another member of the EIP team is due to start their systemic family training at foundational level in
September 23 
Performance
Indicator Due Date Target
Baseline
(previous data) Q1 Q2  Q3  Q4
17 new families  31/03/23 17 12 4 5 29 17 
Priority Action 3: Promote the use of Self-Directed Support (SDS) amongst families using services 
Progress and Achievement in Q4
• We continue to make significant progress in this area of work with families having the option of us
supporting the or making their own decisions about what support looks like. 
Plans for improvement next year ahead
• Consolidate our learning over the past year and develop a team that is skilled and competent in what
is a growing area of need
• Develop a menu of options that offer support to children and their families who have additional support
needs  
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2  Q3  Q4
Increase by 10% the
number of families who
organise their own support 
31/03/23 75 68  46  67  87 
Page 26 of 258

Page 27

5 
Priority Action 4: Further develop the supports offered to Family Group Decision Making and Kinship
supports 
Progress and Achievement in Q4
• The pace of growth in this area of work is a good example of us intervening earlier with families and
more importantly empowering them to find their own solutions.  The team has a skilled workforce who
are fully committed to offering a service that is respectful and works in partnership with families to
manage risk in often very complex situations. 
Plans for improvement next year ahead
• To secure funding for permanent posts as most of the staff are funded via short term funding
applications. 
• To develop the service so that FGDM is core to all the work we undertake in children’s services.
• To develop the service so that we can further support our kinship carers as and when they require
this. 
Performance Indicator
Due
Date Target
Baseline
(previous data) Q1 Q2  Q3  Q4
Number of families who are
referred to Family Group
Decision Making
31/03/23 increase 21/22
figs by 15% 79  32  59  82
Number of families who
participate in Family Group
Decision Making
31/03/23 Increase 21/22
figs by 10% 32  16  24  42
The number of assessments
by kinship worker  31/03/23 increase 21/22
fig by 15% 14  4  6  6
Percentage of kinship carers
who attend engagement
sessions  
31/03/23 80% of Kinship
carers one event New Measure  0 
0
N/A
Reduce the number of
CEYP who enter homeless
accommodation vs other
suitable accommodation
31/03/23 2   N/A N/A N/A
Number of CEYP living with
Foster Carers on After Care
arrangement post 21 years 
31/03/23 3 New Measure  N/A N/A  1
Increase number of young
people in the National
Housing Project 
31/03/23 10-12 New Measure  N/A N/A
27
Average age of young
people in Continuing Care  31/03/23 Age 18  New  Measure   N/A N/A
18 
Priority Action 5: Develop a pathway for children and families to navigate mental health services 
Progress and Achievement in Q4
• There had been an agreement 22/23 for CAHMS for give the LA £100k to develop a Single Point of
Access.  Due to staffing issues within our service this didn’t progress and CAHMS have now
withdrawn the funding for this piece of work. 
Plans for improvement next year ahead
• Develop a Single Point of Access that will be led by CAMHS rather than the LA
• Continue to improve options for C&YP to access mental health services at the earliest point of need. 
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2  Q3  Q4
1 x Single Point of Access in
place (SPOA)  31/03/23 New
Measure 0  N/A  N/A N/A 
Page 27 of 258

Page 28

6 
Priority Action 6: Strengthen mechanisms to support families maximise their income 
Progress and Achievement in Q4
• There has been significant work over the year supporting families to access benefits/additional funding 
which they are entitled to, in order to ease the pressure of the cost of living crisis 
Plans for improvement next year ahead
• Continue to offer this support in a flexible way that meets the needs of families
• Further work to be undertaken regarding referrals received when families have had 3 offers of support
from the Scottish Welfare Fund, we need to develop a pathway that keeps them away from statutory
services and identify what other offers of support they can access. 
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2  Q3  Q4
Number of  families offered an
income assessment 31/03/23 90 60  27 45 68 
Priority Action 7: Children, young people and their families experience high quality services 
Progress and Achievement in Q4
• We have had our inspection of our children’s residential houses where we received ‘Very Good’
grades which is a magnificent achievement. 
Plans for improvement next year ahead
• Ensure we maintain a high standard of care in all our services
• Foster care recruitment will be a focus of work in the coming year, as there is a local and national
shortage of foster carers.
Performance Indicator
Due
Date Target
Baseline
(previous data) Q1 Q2  Q3  Q4
Local Adoption Service will
provide high quality care and
support
31/03/23
Care inspection
Grading of
GOOD
New Measure  N/A N/A N/A
Local Fostering Service will
provide high quality care and
support
31/03/23
Care inspection
Grading of
GOOD
New Measure  N/A N/A N/A
Local Continuing Care/Adult
services will provide high
quality care and support
31/03/23
Care inspection
Grading of
GOOD
New Measure  N/A N/A N/A
Hawthorn Family Learning
Centre will provide high quality
care and support
31/03/22
Care inspection
Grading of
GOOD
New Measure  N/A N/A N/A
Young People’s Care Homes
will provide high quality care
and support
31/03/22
Care inspection
Grading of
GOOD
New Measure  N/A VERY
GOOD N/A 
Priority Action 8: Children and young people are supported to develop a strong sense of their own
identity 
Progress and Achievement in Q4
• We gather qualitative and quantative information regularly which supports our ethos of ensuring C&YP
develop a strong sense of their own identity. 
Plans for improvement next year ahead
• Continue to train staff and carers to better understand life story work and the impact this has on 
C&YP lives   
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2  Q3  Q4
Staff are trained and
understand Life Story work  31/03/23 20 16  N/A at this
time
12 
Page 28 of 258

Page 29

7 
Priority Action 9: Children and young people are supported by staff who understand the importance of
trauma informed practice 
Progress and Achievement in Q4
• Roll out of trauma informed practice for all staff across the service
Plans for improvement next year ahead
• Ensure that trauma informed practice is embedded in all our work and our meetings with families 
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2  Q3  Q4
Staff are trained in using a 
trauma informed approach 31/03/23 20 15  N/A at this
time
N/A at
this time 
N/A at
this time 
Page 29 of 258

Page 30

8 
02. Challenges and Risks
Workforce: The biggest challenge facing children’s services in quarter 4 is the workforce.  Whilst
there is a national workforce issue within social work and social care, we are experiencing higher
levels of staff absence, maternity leave and the inability to recruit external candidates.  The pool of
agency staff is poor as all local authorities are facing similar challenges.  Due to the size of our local
authority being unable to recruit coupled with increased sickness absence results in a significant
impact on services. The volume of work and new initiatives coming into children’s services is
increasing and the challenges of identifying suitably skilled and experienced staff to take forward
pieces of important work is a real issue.  It is becoming increasingly difficult to drive forward change
or to allow time for evaluation around how we are doing business.    
Whilst not the only factor, the issue is exacerbated by our salaries not being as competitive as
neighbouring local authorities.  Within the last 6 years we have only been able to recruit one team
leader from an external source all other positions have been promotions within the organisation.
Furthermore, there is a view that many workers are leaving the profession due to increasing
demands being placed on the social work role. We recognise that this is something that professional
bodies are tackling nationally. 
Currently and unusually we have vacancies for social workers (4), team leader (2) and a service
manager backfill.  The risk this brings to the service is that we are only able to deliver on operational
matters with little or no capacity for managers to do any strategic work.  Our numbers of looked after
and children on the child protection register remain low which means we are getting this right, and
have done for quite some time, but the concern is the volume of referrals coming into the service 
means we could be at risk of missing something that is low level escalating.  Given the many
competing demands upon service managers in particular we have no capacity to undertake
additional work at this stage to improve or better understand this situation.  In August several
managers return from maternity leave thus allowing some capacity within the service to take forward
areas of improvement. 
Children’s Services Referrals: Referrals into the duty team are at an all-time high.  There has been
a 49% increase in the number of referrals since 2020 when the pandemic began, and a 13.39%
increase from last year to this year. Having undertaken some  further exploration a large percentage
of referrals are repeat referrals which evidences that we are not getting things right at the first point
of contact, furthermore a significant proportion are around financial requests.  The inception of the
family wellbeing service will over time support a change in practice and culture where we reduce the
number of repeat referrals, many of which are related to financial pressures within families. 
Unfortunately due to workforce issues around recruitment, sickness and maternity leave we have
been unable to progress a deeper dive into this piece of work.  We are however working with
partners to identify a suitable person to progress this work as an area of priority.    
National Care Service:  The ‘Bill’ which is currently in Stage 1 of the process remains at the
developmental phase.  The Minister for social care has requested an extension to after the summer
recess before publishing another version of what an NCS could look like.  A response is still to be
received as to whether Parliament agrees to this or not.  Given the changes in structure/positions it
is likely this will be granted.  A significant amount of work is happening behind the scenes around
how an NCS could improve outcomes for service users.  Over the summer there hopes to be
extensive consultation with officers in children’s services around the impact of being included or not
within the NCS.  This level of uncertainty is challenging for the workforce and comes at a time when
there is a national workforce crisis across both social work and social care.  Work is however being
progressed regardless of the NCS status around a National Social Work agency (NSWA)  This work
is just commencing but there appears to be a real appetite to progress to a national approach to pay
and conditions across the land.     
The Promise:  The Promise lead has now commenced in post and will progress Midlothian’s
Promise Strategy and plan. A challenge in progressing this work will be to engage with all partner
agencies to ensure shared responsibilities as corporate parents. A series of Promise
engagement/awareness raising will be rolled out across the Council and Partnership and will include
Elected members. 
Page 30 of 258

Page 31

9 
Poverty: As families continue to be impacted by the cost of living crisis this is expected to lead to an
increase in the number of families experiencing poverty. This also applies to workers on low
incomes. Financial requests into the children’s services remains high however we have recently
recruited a worker to look at all financial request to ensure families are accessing the right supports
and benefits.  
Unaccompanied Asylum Seeking Children: The arrival of Ukrainian families continues in
Midlothian with support from the local authority and our 3rd sector colleagues too as well as our
hosts. 
What is more challenging is the arrival of unaccompanied asylum seeking children within Scotland.
Last year Scotland received 280 UASC most of which we were mandated to take.  The numbers
arriving in Kent via the boats are beginning to increase as the weather improves and there is a
legitimate concern that we may be mandated as a country to open a hotel to accommodate young
people.  Within Social Work Scotland and other national groups such as COSLA we are strongly
opposing this approach.  Having children reside within hotels is not a model of care that anyone in
2023 would support and would result in one local authority having a statutory responsibility for all the
looked after young people within this accommodation.  Given the current concerns around lack of
foster care and residential care accommodation it is very concerning how we shall support ongoing
requests to accommodate unaccompanied asylum seeking children and young people.  To date
Midlothian have been able to accept all mandatory requests from the home office however we are
now in a position like many other local authorities where we have no foster care placements or beds
within our children’s house and therefore if a young person under 16 presented tomorrow we would
need to consider an external placement.   
Children with and Enduring Complex Needs: We continue to work with partners to explore how
best to meet the current demands and pressure whilst making sure we future proof our services to
deliver sustainable options locally for children and young people with ASN and Complex and
Enduring Needs. This includes consideration of residential care home provision. 
Foster Care: We continue to seek and explore options to expand our foster carer population
recognising the need to future proof this area of service. We are looking at new campaigns to
promote recruitment of foster carers for both local children and young people but also to consider
caring for unaccompanied asylum seeking children and young people.  Once again this is a national
issue not unique to Midlothian   
Page 31 of 258

Page 32

10 
Page 32 of 258

Page 33

Corporate Solutions Performance Report 2022/23 
Corporate Solutions will “deliver forward looking services fit for a modern
21st Century organisation and put the citizen at the centre of Service
Redesign”.
Corporate Solutions encompasses Finance, Human Resources, Digital, Customer and
Communication Services, Legal & Governance and Corporate Resources.
This report presents the Q4 performance for Corporate Solutions and a summary for the
2022/23 reporting year. Corporate Solutions supports the whole Council delivering services
to internal and external stakeholders; with responsibility for leading the Council’s Medium
Term Financial Strategy and ensuring organisational compliance, developing the workforce
and advancing transformation.
Achievements for 2022/23 
Finance 
• Presentation to Council of a full suite of financial monitoring reports for Quarter 3 to
promote sound financial governance. 
• Development of a detailed Medium Term Financial Strategy with particular focus on
23/24 base budget and Local Government Finance Settlement. 
• The finance team continue to provide in-depth financial input to key revenue and
capital projects embedded in the Medium Term Financial Strategy.
• Benefits claims - reducing the processing times for change of circumstances from 12
days in Q3 to 5 days in Q4 bringing this indicator on target for the last quarter of the
year. 
• Scottish Welfare Fund - £815,042 was awarded from the Scottish Welfare Fund.
7,790 applications were assessed for crisis grants of which 4,083 met the criteria and
resulted in payments. 
• Processing of Community Care Grant applications totalling 1,457 of which 490
payments were made. 
Workforce
• As part of the ongoing review of People Policies:
o Council agreed to 10 days of miscarriage leave to be incorporated into the
suite of family leave policies and committed to the Miscarriage Association’s
pledge. 
o IVF treatment leave has been added to our suite of family leave offerings. 
o Revisions are underway on the Whistleblowing Policy and Overpayments
Policy.
o A Hybrid Working policy has been drafted for consultation and
implementation. 
Item 5.3
Page 33 of 258

Page 34

o Work has commenced on the development of the Wellbeing Strategy which
will focus on the financial, physical and psychological wellbeing of the
workforce.  
o A new Recruitment Strategy is in development which will set out our
objectives in attracting, recruiting and on-boarding talent to the organisation.
Alongside this the HR service has worked with the Communications Service to
develop recruitment documentation for Local Government Worker job
adverts, designed to promote Midlothian’s offer as an employer of choice.
• The Corporate Workforce Plan was launched earlier in the year with a roll out of
workforce planning templates across all services. Succession planning is ongoing to
further understand the organisation and its current environment, analyse the
current and potential workforce, determine future workforce needs and identify
gaps against future needs. 
• Continuation of a rolling programme of Wellness@Midlothian initiatives to ensure
we continue to support the positive health and wellbeing of our staff.  A coaching
programme is planned in for roll out later in 2023. 
• First phase of hybrid working staff survey was conducted with 1,000 staff members
responding. This provided valuable insights into staff wellbeing whilst working from
home/in the community or other work setting. Feedback from the survey is now
being considered and actions put in place as a result of the findings. In addition, a
Hybrid Working Teams news channel was launched in April supported by online staff
sessions providing an overview of the projects visions, current work streams and
events. 
• As part of transformational activities, the Human Resources Business Partners
continue to contribute a significant amount of resource working with services
supporting service reviews. 
• Work also continues with services on employee relations cases across the council
supporting managers and providing guidance. 
• Our Employment and Reward and Business Applications teams successfully
implemented the Local Government Worker pay award and associated backdated
payments. 
Digital 
• Continued progression of the Digital Services Strategy ensuring the Council has the
capacity and skills to take forward the associated investment and delivery of plans. 
• Hybrid Working project: Over the year, workspaces have been upgraded across
Midlothian and Fairfield House.  Over 1000 corporate laptops have been migrated to
Global Protect and upgraded to Windows 10 version. In addition, approximately
1,000 mobile phones have been migrated to new platforms to allow better
integration with Microsoft Office 365(M365) plans. A new desktop booking
application has been launched to enable staff to easily find and book a workspace.
• Target Operating Model: A new structure was agreed to strengthen the core staffing
of Digital Services and Phase 1 is almost complete. 
• Education strategy: New Web Filtering software has been successfully piloted in
schools. A new Wi-Fi network for Chromebooks and iPads has been introduced. A 3rd
Page 34 of 258

Page 35

party Wi-Fi audit for schools has taken place and the actions are being implemented
to improve coverage and capacity. Significant planning for phase 2 and phase 3 of
the strategy has been completed. 
• Digital enabled projects: a number of business applications have been upgraded
throughout the year and those continue to improve customer and staff experience
including ITRENT, ManageEngine systems, Nutanix, Mosaic, TotalMobile,
OpenRevenues, Civicapay, Civica Automation and Committee Management System. 
• This quarter, Business Services successfully rolled out a Print and Post service across
our Revenues team which ensures that customer correspondence in relation to the
Revenues and Benefits service are sent out timeously, whilst reducing internal
resource, postage and stationary costs required to do so. 
• Cyber Security resilience: A Cyber Incident Response partner was established to
provide incident management and forensic support. A number of phishing exercises
for staff have been conducted this year. The team deployed a Meta Learn to MS
Teams to provide cyber security training to all staff. This was supported by Cyber
Scotland Awareness week with an information publicity campaign. 
• M365: A Project Board has been established to deliver M365 and security and
compliance assessment has been completed by Insight to help manage the data
protection risks of compliance. 
Customer 
• Work continues on implementing the Customer Services Platform (CSP) for
Midlothian Council:
o This year saw the launch of the FOI/EIR module which introduced a new
public FOI disclosure log, in addition to the Council’s Publication scheme,
making more information easily accessible to members of the public. 
o The Registrars module launched in Q3 allowing customers to request and pay
for replacement birth, death and marriage certificates online, at a time that is
more convenient to them; and has reduced the demand on the team through
introducing this self-service functionality. 
o The customer feedback module was launched in April 2023. Further
information on performance will be contained within the Q1 2023/24 report.  
o The work programme for CSP was reviewed in 2022, with a further 20
modules identified for implementation in the first half of 2023. These include
civic licence applications and environmental health service requests. CSP is
crucial to the way the Council transforms the customer experience through
redesigning key services that will improve the end to end customer journey. 
o Other modules in progress are missed refuse bins, assisted collections,
additional recycling containers, bulky uplifts and Subject Access Requests.
These are all in either design, configuration, build or test phases prior to
launch. 
• In support of the cost of living crisis, two additional ‘Warm and Well’ Hubs in
Danderhall and Loanhead Libraries were launched this quarter (to complement the
hubs launched in Lasswade and Newbattle) to help our communities with the cost of
Page 35 of 258

Page 36

living crisis. All sites provide free soup and hot drinks plus access to all other library
resources including free books, Wi-Fi, PC access and information. 
• Library Services has remained busy this year with the majority of activities and
events, which had been suspended due to COVID, having resumed. Highlights this
year include:
o The launch of the NHS ‘Near Me’ video appointment service in Gorebridge
Library. This pilot project provides a safe, secure private space for
appointments and supplies the technology and support for people to access
them. Midlothian is one of 10 library services across the country providing
this service.
o Book Week Scotland 2022 which saw 51 events take place across libraries
with almost 2000 people attending.
o In partnership with the University of Edinburgh’s Engineering Department
which tied in with the ‘Gadgeteers’ theme pop-up engineering sessions were
held across the county including rocket launching and bridge building. 
o Through Scottish Government COVID Relief Funding, the library services
launched a new Bibliotherapy service for people living with long term health
conditions. The ‘Writing for Wellbeing’ course received very positive
feedback.
o Gorebridge Library was selected as one of the first in Scotland to host a ‘Lend
and Mend Hub’ as part of a trailblazing pilot project managed by the Scottish
Library and Information Council. The hub, which is funded by the John Lewis
Partnership £1m Circular Future Fund will help the local community and
wider to repair, reuse and upcycle everyday items. 
• Physical Library visits have increased significantly this year with 383,702 visits for this
year compared to 156,250 for 21/22. As a result, virtual library visits has decreased
from 225,804 in 2021/22 to 170,797 this year. Overall, total library visits has
increased by 45% this year compared to last. 
Procurement 
• Work continues on the development of the SME/Procurement strategy. The team
have reviewed and streamlined the non-competitive action process, the request for
procurement and developed a non-regulated procurement process and new contract
database. The team are working to implement a review of the procurement
arrangement across the Council including continuing to explore options for joint
working with neighbouring councils, populating and maintenance of the new
contract database. 
• The team continues to utilise framework agreements with Scotland Excel which
provides an easier route to market and delivers value for money. 
• A range of high value/complex contracts continue to be awarded and key activities
include overhaul of Contract Database and City Deal participation. A follow up
review of upcoming expiring contracts within Health and Social Care began this year.
The review will look for opportunities to extend services, and consolidate
opportunities for efficiency.  
Page 36 of 258

Page 37

• Progress being made for consultation on a new procurement structure, designed to
increase the capacity and capability in this area. 
• The Annual Procurement Report 2021/22 was presented to Council in December
2022.
• The Procurement Service have been working closely with the Economic
Development Service to strengthen the relationship with local suppliers and deliver
against the Local Procurement Strategy. A number of ‘Meet the Buyer’ events has
taken place this year, as well as a specific work stream on local tradespeople as part
of the Building Maintenance Transformation programme. Further information is
contained within the Place Q4 update. 
Page 37 of 258

Page 38

Challenges and risks
Financial position
Council approved the 2023/24 budget at its meeting on 21 February 2023. Delivery is reliant
on a combination of savings and service reductions and includes the use of retrospective
service concession savings and earmarked Covid recovery reserves. Whilst the 2023/24
budget is agreed, the challenge remains to reach ongoing financial sustainability. Cost and
income projections for future years will be embedded in the Council’s Strategic Blueprint
which contains a range of transformation themes to drive towards a position of financial
sustainability. Close working continues with the Business Transformation Steering Group to
respond to the challenge.
Risk 
The Council’s Strategic Risk Profile is presented retrospectively to Audit Committee
quarterly. For 2022/23, the most critical risks to the Council are Financial Sustainability,
Climate Change and the Change Programme. Corporate Solutions is key to the delivery of
mitigating actions to these risks; through strategic planning and the Medium Term Financial
Strategy, and driving forward the Council’s transformation programme to derive change and
redesign services. 
Economic pressures
Inflation, as well as rising energy costs, are affecting the construction industry in Scotland.
The UK is currently experiencing unprecedented adverse market conditions, leading to
significant rises in tender prices for a wide range of materials. There is evidence that
inflation of between 10% and 15% beyond BCIS predictions is affecting projects. The
pandemic has also accelerated financial challenges, and the growth from being the fastest
growing local authority in Scotland places significant pressure on Midlothian to be able to
deliver services to its citizens. 
In response to all of these pressures, a range of reprioritisation activity is taking place, with
a revised Capital Plan being considered by the cross- party Business Transformation Steering
Group, and options to review what and how services are delivered as part of the savings
measures to reduce the funding gap. 
National Care Service
The estimated funding gap for the next three financial years does not include the associated
costs of the Scottish Government’s National Care Services (Scotland) Bill.  If enacted, the bill
would have fundamental implications for the community and for Local Government
itself.  The wide reaching changes in the bill aim to deliver a National Care Service by the
end of the parliamentary term, which will impact on all aspects of the work of the Corporate
Solutions team, including financial implications, in both revenue and capital, our asset base,
our workforce, governance and legal arrangements and our digital infrastructure and
platforms. It will require an immediate focus for the foreseeable future and this will
inevitably have implications for other priority work at a time of continued resource
constraint. 
Page 38 of 258

Page 39

Cost of Living Crisis
Midlothian’s citizens are facing significant financial challenges. The impact on households is
already being noted across the UK with 93% of adults reporting an increase in their cost of
living in March 2023 (Office for National Statistics; Francis-Devine et al, 2022). The UK is
currently facing an unprecedented wave of increasing prices, bills and tax challenges. The 41
year high inflation rate of 10.4% is the main driver of the cost of living crisis which has
outstripped wage and benefit increases. The price rises will impact low-income households
hardest as a larger proportion of their costs are on energy and food. 
The Resolution Foundation estimates that absolute poverty is set to rise in the short-run,
from 17.2% in 2021-22 to 18.3% in 2023/24 (or an additional 800,000 people in poverty).     
As our citizens feel the impact of the Cost of Living Crisis, they will seek additional support
from public services; in particular local authorities. To respond to this emerging crisis, the
Council established a Cost of Living Task Force last year, which is chaired by the Council
Leader and meets regularly to coordinate mitigating activities. 
In Q3 2022/23, the Council established four ‘Warm and Well’ hubs in the Lasswade,
Newbattle, Danderhall and Loanhead libraries, as safe and warm spaces that all Midlothian
citizens can access. The hubs provide free hot food and drinks, the opportunity to socialise
with others and access free wifi to work, study, as well as enjoy books, jigsaws and games. 
Across the year, requests for crisis funding remains consistently high, with over £815k
awarded from the Scottish Welfare Fund and 9,247 applications for Crisis Grants and
Community Care Grants. Application numbers across quarter 1 to 3 average 2,150 with the
highest number of applications received during Q4 of 2,778. This demonstrates the
significant challenge faced by our communities. 
Growing Council
Midlothian is projected to have the highest percentage change in population size of all
mainland council areas in Scotland. From 2018 to 2028, the population of Midlothian is
projected to increase from 91,340 to 103,945. This is an increase of 13.8%, which is in
contrast to a projected increase of 1.8% for Scotland as a whole, with a 40.9% increase in
older people over 75. In addition, Midlothian has 10 zones which fall into the most deprived
areas giving a local share of 8.7% living in the most deprived areas in Scotland. 
This growth creates the opportunity to meet housing need with 25% of new homes being
built in the affordable housing provision, in addition to the expansion in our Council house
building. This construction directly supports employment and will see a steady increase in
the value of Council Tax income received over time. 
To ensure Midlothian is ‘building back better’, this investment is also creating new jobs,
apprenticeship opportunities, opportunities for businesses and communities and families
hard-hit by the impact of the pandemic. These new opportunities help lead the way towards
a better future for Midlothian. 
Midlothian’s approved Capital Strategy sets out the infrastructure required to meet those
demographic pressures and includes the financial contributions Midlothian will make to the
Page 39 of 258

Page 40

Edinburgh and South East Scotland City Region Deal. Encompassing five main themes the
City Region Deal will bring significant investment across the regions with total investment of
circa £1.3 billion across: 
• Data Driven Innovation: £751 million 
• Integrated Regional Employability and Skills: £25 million 
• Transport: £156 million 
• Culture: £45 million 
• Housing: £313 million 
Through the Data Driven Innovation strand the Deal will leverage existing world-class
research institutes and commercialisation facilities in order that Easter Bush becomes a
global location of Agritech excellence. The Easter Bush project includes significant
investment in transport infrastructure along the A701/2 transport corridor. In addition, by
improving on-site infrastructure at Easter Bush and transport infrastructure, The University
of Edinburgh expects commercial partners will be able to co-locate at scale to commercialise
Agritech breakthroughs. 
The Capital Investment Strategy sits centrally within the Council’s future planning activities
and in doing so has to reflect the demands of Council services to ensure positive outcomes
are achieved in the right place, at the right time for the maximum benefit to
Midlothian.  The extensive capital programme, totalling £0.8bn, delivers new schools, a
record investment in council housing, improved community infrastructure, investment in
the local transport network and in innovative developments such as the new low carbon
heat network in Shawfair. In light of the challenging financial landscape the Capital
Programme has been subject to a review and a reprioritisation. 
Opportunities
The Council’s transformation programme provides the framework for opportunities to
change the way services are improved and delivered to be more efficient. Corporate
Solutions has a particular focus on the delivery and acceleration of the Capital Programme,
delivering digital first approaches, embedding automation to improve customer access to
services and hybrid working. The redesign of services and the changes to build back better
are predicated on the overarching principle that in delivering services, whether
commissioned internally or externally, we will keep our communities, our employees and
our environment safe, at the same time as meeting our commitment to being carbon
neutral by 2030. 
The key activity the service is focused on includes:
• Securing continued financial sustainability and maintaining strong financial
management across the Council through the delivery of the Council's Medium Term
Financial Strategy (MTFS) incorporating Capital Strategy and Capital Investment
plans, Reserves Strategy and Treasury Management Strategy;
Page 40 of 258

Page 41

• Nurturing a highly motivated and effective workforce through the delivery of the
Workforce Strategy and the development of Service Workforce Plans;
• Digital first and embracing data insight and analytics by developing and
implementing a refreshed Digital Strategy and Digital Learning Strategy;
• A refresh of the Customer Services Strategy and implementation of the online
payments and services (CSP) platform;
• A refreshed Procurement Strategy and Contract Delivery Plan.
Medium Term Financial Strategy 
The core objective of the Medium Term Financial Strategy is to secure the Council’s financial
sustainability during an ongoing period of financial constraint coupled with acute service
demand pressures and increasing customer expectations. 
The Medium Term Financial Strategy is not only about balancing the budgets, it
provides a means to ensure as far as possible that the limited resources available to the
Council are targeted on delivery of improved outcomes, particularly against the key
priorities of: 
• Reducing the gap in learning outcomes
• Reducing the gap in health outcomes
• Reducing the gap in economic circumstances
• Reducing Midlothian carbon emission to net zero by 2030 
Workforce Strategy 
The purpose of the Workforce Strategy is to ensure that the Council continues to have a
workforce that is able to deliver positive outcomes for the people of Midlothian. It sets out
an approach to supporting, developing and reshaping the workforce now and in the future
in response to changes as a consequence of national and/or local issues. It is underpinned
by the Council’s values and vision. 
The Workforce Strategy is an important tool to outline the organisation’s approach to
articulating how workforce issues will be managed and ensures the Council has the people
and skills to manage change and deliver services effectively and efficiently. 
Digital Strategy and Digital Learning Strategy
Supported by the appointment of SOCITIM Advisory (Society for innovation, technology and
modernisation) as a strategic partner and led by the Digital First Board, work progressed to
deliver an ambitious new digital strategy, Digital Midlothian 2021-2023, “Empowering
People, Enabling Growth”. Aimed at improving the way services are delivered to Midlothian
citizens, the strategy sets out how local outcomes will be improved by delivering digital
services to digitally connected communities. 
Among the aims set out in the new strategy are plans to:
Page 41 of 258

Page 42

• Refresh the council’s approach to customer service, focussing on ‘digital first’, while
making sure alternatives remain in place for those who need them 
• Have a council website that meets customer needs , enabling customers to request
and pay for services online and to log in to see their interactions 
• Implement an update service, so that customers contacting the council online can
receive follow up text messages or emails 
• Look at opportunities to automate and better integrate processes so that staff can
focus on the things that matter most to customers 
• Enable people to stay independent and healthy for longer by using data and
technology 
• Introduce bookable online and face-to-face appointments so that customers don’t
have to waste time queuing or travelling and to help the council reduce costs 
• Review and improve online engagement with customers, including online
consultations, communications and social media 
• Promote Midlothian as a digital destination, creating an environment that attracts
leading digital businesses to the area and supporting the innovation of start-ups 
• Cultivate digital skills in our communities, ensuring that young people have access to
the technology and support that they need to improve educational outcomes and to
prepare them with the skills they need for the future 
• Reduce digital exclusion and empower learners of all ages, enabling online access
and supporting them to develop digital skills 
• Support Midlothian to achieve high speed connectivity, smart infrastructure and
resilient cyber defences.
Customer Service Strategy
The Customer Service Strategy defines the key drivers that will enable Midlothian Council to
deliver a high level of service to our communities. It outlines the commitment to provide
choice to the customer in the way services are accessed and provided. This includes
innovation, partnership working and optimising the use of technology within resource
constraints. The strategy will help us to change the way we deliver services utilising the
latest technologies and linking to national frameworks. 
As one of the fastest growing areas in Scotland, the Council cannot support more customers
using the current resources, systems and processes. This means that the adoption of digital
and automated processes will be key to continuing to provide a seamless customer journey,
satisfying enquiries at the first point of contact and meeting increased demand. 
Customer self-service and new automated processes can help deliver some key services
without customers dealing directly with a member of staff and could truly transform the
way the Council deliver services. Increasing the pace of digital transformation, particularly in
front-facing customer services, will be a service and corporate priority.
There continues to be a steady volumes of calls via our Contact Centre, with 163,113 calls
received during 22/23 compared to 168,692 for 21/22.  As well as webforms and social
media, the contact centre have dealt with 13,000 emails in Q4, an increase from 9,000
during Q3. Call handling performance during quarter 4 has reduced to 56% of calls answered
Page 42 of 258

Page 43

within 60 seconds compared to 64% in Q3. The decrease in call handling performance is due
to seasonal impacts of severe weather and service activity such as Council Tax billing and
garden waste service. As a result of high call volumes, Q4 saw an increase in call
abandonment rate to 9% from 6% in Q3. 
Procurement Strategy 
The procurement function has a central role in supporting the Council to achieve its
strategic priorities within a constrained financial envelope. Procurement allows the Council
to repurpose its spending power to drive our key strategic priorities and to secure the best
possible value and outcomes for Midlothian. Effective procurement can maximise the value
of every pound spent in terms of jobs, skills and supply chain opportunities in the local
community. We will aim to address economic, social and environmental considerations at all
stages of the procurement cycle within the rules of open, fair and transparent competition. 
The Procurement team, in conjunction with Economic Development, have developed a
Small and Medium Enterprise (SME) Strategy to support and assist local businesses to win
contracts fairly and transparently in a competitive market. We will further develop our
collaborative and commercial relationships with key partners as part of our strategic
category management approach, to deliver the best possible outcomes for the citizens of
Midlothian. 
Page 43 of 258

Page 44

Page 44 of 258

Page 45

Item 5.3
Page 45 of 258

Page 46

Corporate Solutions 22/23 performance report Trend Data A full review of quarterly performance data is available via Pentana (Browser login link - https://midlothian.pentanarpm.uk/login)
115
109 109
115
120
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Total number of female
employees in top 5%
45,903 44,243 46,715
38,422 41,417
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Number of virtual library visits
4933
8343 8892 8956 8230
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Number of Council Tax
transactions received online
354 331 338 283
774
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Number of social media
contacts via Contact Centre
2.58
1.72
0.49
2.29
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Corporate Solutions - Average
number of working days lost
due to sickness absence
(quarterly) 3,893
3,345
2,710 2,783
3,613
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Number of webforms received
via Contact Centre
2.40% 2.40%
3.60%
2.40% 1.96%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Percentage of staff turnover
(including teachers)
253
364
257 311
406
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Number of Freedom of
Information requests received
(Council wide)
2,173 2,189 2,107
2,778
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Number of Scottish Welfare
Fund applications received
808,000
208,730
423,781
662,225
815,042
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Total amount granted from
Scottish Welfare Fund for crisis
grants and community care
grants (£) (cumulative)
2.7
3.5
2.5 3
5.4
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Average time in working days
to respond to complaints at
stage 1 (Corporate Solutions)
Target (5 days)
54 59
37
47
68
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Number of complaints
received (Corporate Solutions)
Page 46 of 258

Page 47

Our customers have choice in the way Council services are accessed and provided 
Channel-shift has increased by the adoption of new digital tools and automated practices 
Delivery of customer service excellence to our communities
Our Customers
Holistic
Modern
Hub and Spoke
One size fits one
Key highlights
Work continues on implementing the Customer Services Platform (CSP) for Midlothian Council. This year saw the launch of the FOI/EIR module which introduced a new
public FOI disclosure log, in addition to the Council’s Publication scheme, making more information easily accessible to members of the public. The Registrars module
launched in Q3 allowing customers to request and pay for replacement birth, death and marriage certificates online, at a time that is more convenient to them; and has
reduced the demand on the team through introducing this self-service functionality. The customer feedback module is complete and will be launched in Q1 2023/24. 
Other modules in progress are missed refuse bins, assisted collections, additional recycling containers, bulky uplifts and Subject Access Requests. These are all in either
design, configuration, build or test phases prior to launch. The work programme CSP was reviewed last quarter, with a further 20 modules identified for implementation
in the first half of 2023. These include civic licence applications and environmental health service requests. CSP is crucial to the way the Council transforms the customer
experience through redesigning key services that will improve the end to end customer journey. 
In support of the cost of living crisis, this year, the Council established four ‘Warm and Well’ hubs in the Lasswade, Newbattle, Danderhall and Loanhead libraries, as safe
and warm spaces that all Midlothian citizens can access. The hubs provide free hot food and drinks, the opportunity to socialise with others and access free wifi to work,
study, as well as enjoy books, jigsaws and games. 
Library Services remain busy with the majority of activities and events, which had been suspended due to the pandemic having resumed. Various activities have taken
place across the year including, Book Week Scotland 2022 saw 51 events take place across libraries with almost 2000 people attending. Gorebridge Library has been
selected as one of the first in Scotland to host a ‘Lend and Mend Hub’. Physical Library visits have increased significantly this year with 383,702 visits for this year
compared to 156,250 for 21/22. Overall, total library visits has increased by 45% this year compared to last. 
Areas of improvement 
Our Contact Centre received 163,113 calls during 22/23 compared to 168,692 for 21/22.  As well as webforms and social media, the contact centre have dealt with 13,000
emails in Q4, an increase from 9,000 during Q3. Call handling performance during quarter 4 has reduced to 56% of calls answered within 60 seconds compared to 64% in
Q3. The decrease in call handling performance is due to seasonal impacts of severe weather and service activity such as Council Tax billing and garden waste service. As a
result of high call volumes, Q4 saw an increase in call abandonment rate to 9% from 6% in Q3. 
Resources continue to be prioritised to process Scottish Welfare Fund applications as soon as these are received. This has meant that processing times for change in
circumstances for benefit applications etc have experienced some delays throughout this year.  This year £815,042 was awarded from the Scottish Welfare Fund. 7,790
applications were assessed for crisis grants of which 4,083 met the criteria and resulted in payments. 
57
69
45 35 41
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Average processing time for
new benefit claims (Days)
Target (25 days)
11 10
17
12
5
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Average processing time for
change of circumstances
(Days)
Target (8 days)
44,769
40,575
38,943 38,932
44,663
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Number of Contact Centre
calls
Page 47 of 258

Page 48

Digital by default
We pledge to optimise the ways in which the Council does digital, data and technology to work effectively, collaborate, make decisions, adapt
and innovate
We pledge to create better relationships between the Council and its communities by providing modern digital services that communities
wants to use 
We pledge to maximize opportunities for digital, data and technology to enhance quality of life, the economy, sustainability and individual
opportunity in Midlothian 
Key highlights 
• Continued progression of the Digital Services Strategy ensuring the Council has the capacity and skills to take forward the associated investment
and delivery of plans. 
• Hybrid Working project: Over the year, workspaces have been upgraded across Midlothian and Fairfield House.  Over 1000 corporate laptops
have been migrated to Global Protect and upgraded to Windows 10 version. In addition, approximately 1,000 mobile phones have been migrated
to new platforms to allow better integration with Microsoft Office 365. A new desktop booking application has been launched to enable staff to
easily find and book a workspace.
• Target Operating Model: A new structure was agreed to strengthen the core staffing of Digital Services and Phase 1 is almost complete. 
• Education strategy: New Web Filtering software has been successfully piloted in schools. A new Wi-Fi network for Chromebooks and iPads has
been introduced. A 3rd party Wi-Fi audit for schools has taken place and the actions are being implemented to improve coverage and capacity.
Significant planning for phase 2 and phase 3 of the strategy has been completed. 
• Digital enabled projects: a number of business applications have been upgraded throughout the year and those continue to improve customer
and staff experience including ITRENT, ManageEngine systems, Nutanix, Mosaic, TotalMobile, OpenRevenues, Civicapay, Civica Automation and
Committee Management System. 
• This quarter, Business Services successfully rolled out a Print and Post service across our Revenues team which ensures that customer
correspondence in relation to the Revenues and Benefits service are sent out timeously, whilst reducing internal resource, postage and
stationary costs required to do so. 
• Cyber Security resilience: A Cyber Incident Response partner was established to provide incident management and forensic support. A number
of phishing exercises for staff have been conducted this year. The team deployed a Meta Learn to MS Teams to provide cyber security training to
all staff. This was supported by Cyber Scotland Awareness week with an information publicity campaign. 
• M365: A Project Board has been established to deliver M365 and security and compliance assessment has been completed by Insight to help
manage the data protection risks of compliance. 
Work will progress on the Digital Services priorities to continue to drive the Council’s vision to improve outcomes using dig
Modern
3,538 3,141 3,311 2,963 3,1273,325 2,982 2,975 2,789 2,851
Q4 21/22 Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of service incidents
Received Resolved
2,115 1,969
2,298
1,964 1,9451,917 1,719
2,038 1,802 1,728
Q4 21/22 Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of service requests
Received Resolved
Page 48 of 258

Page 49

Our Workforce
Our people deliver high performing services
We build an entrepreneurial council for future
We demonstrate strong and consistent leadership 
We Promote Equality, diversity and fairness 
Key highlights 
• Policy and Strategy: A review of our People Polices is currently underway. The Council agreed to 10 days of miscarriage leave to be
incorporated into our suite of family leave policies and committed to the Miscarriage Association’s pledge. In addition, IVF treatment leave
has also been added to our suite of family leave offerings. Revisions are underway on the Whistleblowing Policy and Overpayments Policy. A
Hybrid working policy has been drafted for consultation and implementation. Work has commenced on the development of our Wellbeing
Strategy which will focus on the financial, physical and psychological wellbeing of our workforce.  A new Recruitment strategy is also in
development which will set out our objectives in attracting, recruiting and on-boarding talent to the organisation. Alongside this the HR
service has worked with the Communications Service to develop recruitment documentation for Local Government Worker job adverts,
designed to promote Midlothian’s offer as an employer of choice.
• This year we launched the Corporate Workforce Plan and roll out of workforce planning templates across all services. Succession planning is
ongoing to further understand the organisation and its current environment, analyse the current and potential workforce, determine future
workforce needs and identify gaps against future needs. 
• Continuation of a rolling programme of Wellness@Midlothian initiatives to ensure we continue to support the positive health and wellbeing
of our staff.  A coaching programme is planned in for roll out later in 2023. 
• First phase of hybrid working staff survey was conducted where 1,000 staff members took part which provided valuable insights into staff
wellbeing whilst working from home/in the community or other work settings. Feedback from the survey is now being considered and actions
put in place as a result of the findings. In addition, a Hybrid working news channel was launched in April as well as various staff sessions
providing an overview of the projects visions, current workstreams and events. 
• As part of transformational activities, the Human Resources Business Partners continue to contribute a significant amount of resource working
with services supporting various service reviews. Work also continues with services on various employee relations cases across the council
supporting managers and providing guidance in relation to a variety of People Polices. 
• Our Employment and Reward and Business Applications teams successfully implemented the Local Government Worker pay award and
associated backdated payments. 
Holistic
9.33
2.71
4.81
7.89
11.04
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Sickness Absence Days per
Employee - cumulative (All
employees) 4.61
1.35
2.10
3.86
5.62
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Teacher Sickness absence days
11.22
3.25
5.92
9.51
13.20
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Local Government employees
Sickness absence days
2.52% 2.57% 2.84%
3.58%
2.86%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Gender pay gap between
average hourly rate of pay for
male and female(all employees)
Scottish average 21/22 (3.51%)
Page 49 of 258

Page 50

Finance 
The grant settlement for 2022/23 means a further real terms reduction in core funding. The reliance on one off funding sources to
balance the 2022/23 budget combined with the challenging outlook for local government funding adversely impacts on the Council‘s
financial sustainability and will result in the need to cut services in 2023/24 and beyond. 
The Council has robust and effective financial management arrangements
Key highlights 
• Presentation to Council of a full suite of financial monitoring reports for Quarter 3 to promote sound financial governance. 
• Development of a detailed Medium Term Financial Strategy with particular focus on 23/24 base budget and Local Government Finance
Settlement. 
• The finance team continue to provide in-depth financial input to key revenue and capital projects embedded in the Medium Term Financial
Strategy.
Areas for improvement: Council approved the 2023/24 budget at its meeting on 21 February 2023. Delivery is reliant on a combination of savings and
service reductions and includes the use of retrospective service concession savings and earmarked covid recovery reserves. Whilst the 2023/24 budget is
agreed, the challenge remains to reach ongoing financial sustainability. Cost and income projections for future years will be embedded in the Council’s
Strategic Blueprint which contains a range of transformation themes to drive towards a position of financial sustainability. Close working continues with
the Business Transformation Steering Group to respond to the challenge.
Inflation, as well as rising energy costs, are affecting the construction industry in Scotland. The UK is currently experiencing unprecedented adverse market
conditions, leading to significant rises in tender prices for a wide range of materials. There is evidence that inflation of between 10% and 15% beyond BCIS
predictions is affecting projects. The pandemic has also accelerated financial challenges, and the growth from being the fastest growing local authority in
Scotland places significant pressure on Midlothian to be able to deliver services to its citizens. 
In response to all of these pressures, a range of reprioritisation activity is taking place, with a revised Capital Plan being considered by the cross party
Business Transformation Steering Group, and options to review what and how services are delivered as part of the savings measures to reduce the funding
gap. 
Sustainable
Holistic
Modern
Preventative
108%
146% 127% 92% 91%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
In year recovery of
overpayments-% of all
Housing benefit overpayments
identified
Target (80%)
14%
5%
9%
4% 5%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
All recovery overpayments-as
a % of all HB overpayment
debt
Annual Target (20%)
95%
94%
94.9% 94.9%
94.4%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
% of invoices sampled and
paid within 30 days -
Corporate Solutions
Target (95%)
Page 50 of 258

Page 51

Procurement  Best Value is evidenced Council Wide in the procurement of goods and services 
Effective contract and supplier management across the whole of the procurement journey  
Key highlights
• Work continues on the development of the SME/Procurement strategy. The team have reviewed and streamlined the non-
competitive action process, the request for procurement and developed a non-regulated procurement process and new contract
database. The team are working to implement a review of the procurement arrangement across the Council including continuing to
explore options for joint working with neighbouring councils, populating and maintenance of the new contract database. 
• The team continues to utilise framework agreements with Scotland Excel and Procurement for Housing (amongst others) which not
only provides an easier route to market but also delivers value for money. 
• A range of high value/complex contracts continue to be awarded and key activities include overhaul of Contract Database and City
Deal participation. A follow up review of upcoming expiring contracts within Health and Social Care began in Q2 and is in early stages.
The review will look for opportunities to extend services, and consolidate opportunities for efficiency.  
• Progress being made for consultation on a new procurement structure, designed to increase the capacity and capability in this area. 
• The Annual Procurement Report 2021/22 was presented to Council in December 2022. 
Areas of improvement 
Work will continue to progress on the Procurement priorities: Review and reshape the procurement service, implement learning from the
Scotland excel review and in partnership with Economic Development and stakeholders continue to ensure business community benefits in
the supply chain to maximise opportunities for local people.
Holistic
Sustainable
Hub and Spoke
One size fits one
15.44% 14.68% 16.81% 13.78%
18/19 19/20 20/21 21/22
% of procurement spent on
local enterprises (LGBF)
Scottish average 21/22 (29.88%) Page 51 of 258

Page 52

Page 52 of 258

Page 53

1
Education Performance Report 2022/23
01. Progress in delivery of strategic outcomes
Item 5.4
Page 53 of 258

Page 54

2 Page 54 of 258

Page 55

3 Page 55 of 258

Page 56

4 Page 56 of 258

Page 57

5 Page 57 of 258

Page 58

6 Page 58 of 258

Page 59

7
01. Progress in delivery of strategic outcomes
21/22: Midlothian Single Plan Priority Reducing the gap in learning outcomes  
Priority 1: Attainment and Achievement 
1.1 Improve attainment within the Broad General Education (BGE) stages:
Trend Data & Target 
2017 2018 2019 2021 2022 Ave. (17-19) Target
Pr Literacy  62.25% 74.68% 72.76% 65.75% 68.20% 68.86% 71.5%
Pr Numeracy 71.14% 79.63% 77.77% 72.80% 76.05% 75.34% 72.0%
S3 Literacy 76.73% 80.25% 86.80%  80.70% 69.90% 88.0%
S3 Numeracy 88.81% 87.68% 89.56%  88.50% 88.68% 90.5% 
Key Actions Q4 – Completed activity Q1 23/24 – Planned activity
1.1.1 Develop and
implement a raising
attainment strategy 
- Draft strategy co-created with working group of school leaders and performance officer
All HT's aware of Midlothian's focus on raising attainment and schools monitoring progress towards
achievement of stretch aims. Data shows increase in attainment for targeted
schools.                                                                                                              
- All primary schools (and IWBS) are engaging with new numeracy frameworks and 95% of
primaries (and all Secondary English PTs in 6 secondaries) engaging with writing frameworks
including increased moderation activity at ASG level and 70% of primary schools represented in
Authority literacy QAMSO action group. 
- Recovery team CLPL the most subscribed to in the Professional Learning Academy (outwith NQT
specific events) with 100% positive feedback forms which include identified actions or future
intended learning. 
- All schools now have access to the data dashboard which will enable analysis of trends in
attendance and attainment across Midlothian and inform priorities and planning. 
- School SIRs include evidence of approaches taken and progress made towards
stretch aims.
- School SIPs and PEF plans for 2023-24 reflect strategy.
- Plan for professional learning established in consultation with schools and
networks and informed by analysis of SQR, attainment data and PEF reporting.
- Analysis of SQR reveals effective moderation taking place in all schools/ASGs
and plans in place to continue to build capacity and activity in session 2022/23.
1.1.2 Develop a full
range of curriculum
frameworks. 
- Professional Learning Offer in place to support engagement with literacy and numeracy
progressions. All primary schools have had initial roll-out visit, with over 450 staff trained in
refreshed progressions. All schools highly engaged in training sessions and overall feedback has
been extremely positive (gathered through feedback forms and site feedback)
Ongoing positive collaboration with Education Scotland with enquiries from Local Authorities across
Scotland regarding accessing resource.
- Refreshed assessment framework launched in January to all schools to support assessment and
moderation through the phases and improve quality of teacher judgement
- Pilot trial of digital consolidation sheets to support retrieval practices in Numeracy which supports
learning and attainment
- All settings have plans in place for full implementation of Midlothian progression pathways.
- 
- All schools using Literacy and Numeracy Frameworks to support planning,
teaching and assessment. Visit 2 will give information on use of frameworks
- Finalised suite of wider curricular frameworks launched with all schools and
settings for use from 2023/24.
- Moderation activity planned for session 2023/24 utilising Literacy, Numeracy and
QAMSO Networks and Midlothian Frameworks.
1.1.3 Revise
Midlothian’s Learning,
Teaching and
Assessment policy.
- Professional Learning Offer for school leaders on strategic leadership of elements of LTA Policy
- Themes from Visit 2 (Focus 2.3) support with LA Self evaluation of strengths and areas for
improvement to inform the development of the LTA Policy.
- Final LTA Policy agreed for all school engagement during session 2023/24
- QA Processes and analysis of schools SQR  reveal an increasing percentage of
schools rated as good/very good for key Quality Indicators.
- Consultation with school leaders and networks to inform professional learning
offer for session 2023/24.
Page 59 of 258

Page 60

8
1.1.4 Develop and pilot
an effective tracking
and monitoring
system, incorporating
development of
stretch aims. 
- Final phase of evaluation of the new system in primary schools underway, with review and
consultation with working group and schools involved.
- Revisions being made to the process and tools to support school improvement. The minor
changes to the approach are being reviewed with the schools and technical issues are being
worked through. before full implementation in all primary schools next quarter.
- Training programme on the system being planned and scheduled with all schools.
- Full implementation of final tracking system in all schools.
- Training programme on the system to be planned by ASG and data coaches to
take forward ownership within the school.
1.1.5 Support schools
and settings to make
best use of digital
tools to enrich,
enhance and improve
learning, teaching and
assessment
- Review short term targets with schools and settings against agreed measures and evaluate
progress. Co-create short term targets (Jan-June)
- Pilot Third and Fourth levels of Digital Literacy Framework through secondary school working
group
- Launch Google Workspace Skills for P7-S2 pupils to establish a benchmark standard of fluency
using Workspace by end of BGE
- Review Professional Learning offer and plan for next steps
- Build engagement with EquatiO through Secondary Maths subject lead network
- Evaluate impact of implemented changes and use this to inform next steps
- Review and evaluate impact of Digital Literacy Framework
- Finalise app library offer for 23/24 and associated training offer
- Survey pupils, families and staff to understand to identify changes in attitude,
proficiency and use of digital tools to enrich, enhance and improve learning,
teaching and assessment
- Plan and host launch event for Midlothian’s Apple Regional Training Centre,
showcasing the work of our schools and settings and learning from others
- Managed transition of all devices and reallocation of school leavers’ devices 
1.2 Improve attainment within the senior phase by maximising opportunities through curriculum planning, consortium arrangements and partnership delivery,
including addressing the ASN Senior Phase Gap 
Trend Data & Targets for School Leavers 
2018 2019 2020 2021 Ave. Target
Lit & Num SCQF Level 4  88.93% 89.45% 90.48% 89.85% 89.93% TBC
Lit & Num SCQF Level 5 66.33% 63.76% 65.12% 66.36% 65.08% TBC       
1+ @ Level 4 97.23% 96.67% 97.17% 95.44% 96.84% 96.0%
1+ @ Level 5 85.49% 86.01% 84.43% 84.72% 85.56% 86.0%
1+ @ Level 6 60.58% 56.08% 60.62% 59.98% 59.19% 60.0%       
5@ Lv 5 60.58% 58.37% 63.45% 63.17% 60.86% 65.0%
3@ Lv 6 46.62% 42.89% 49.94% 47.66% 46.09% 50.0%
5@ Lv 6 32.56% 30.05% 36.94% 33.98% 32.33% 35.0% 
Key Actions Q4 – Completed activity Q1 23/24 – Planned activity
1.2.1 Develop and implement a
raising attainment strategy 
- Attainment Visits and Secondary HT meetings support school engagement with strategy. 
All HT's aware of Midlothian's focus on raising attainment and schools monitoring progress
towards achievement of stretch aims. 
All Secondary English PTs in 6 secondaries) engaging with writing frameworks including
increased moderation activity at ASG level 
- Secondary School Improvement Reports include evidence of approaches
taken and progress made towards stretch aims.
- School SIPs for 2023-24 reflect strategy.
1.2.2 Review the Senior Phase
curriculum offer and pathways
into positive sustained
destinations.
- Collaborative Enquiry curriculum plan in place and shared with school leaders to inform
developments for 23-27
- Outline proposal shared with Secondary HTs.  Agreement sought at  meetings in June to
agree alignment.  This alignment will allow us the framework to build improved partnership
working with the FE/HE sectors and develop a FA Schools based model.  All for 24/25
implementation 
- DEC bid with East Lothian agreed,  this will support an improved engineering pathway
- School 23/24 SIPs reflect this approach
- Development of Digital Senior Phase offer;  new School College Partnership
model agreed;   development of schools based Level 6 FA model 
1.2.3 Review and develop
approaches that will allow
secondary schools to implement
reduced class contact time, in
- Confirm for each secondary school an action plan that supports the transition to the agreed
approach from August 2024.
- Work with Business Executive colleagues to ensure that our DSM model and allocations
support the implementation of approaches from August 2024.
- No progress based on above, await further necessary detail from Scottish Government
- School 23/24 SIPs reflect this approach
- Actions dependent on detail from Scottish Government
Page 60 of 258

Page 61

9
line with SG policy,  for teachers
from August 2024 
1.2.4 Revise Midlothian’s
Learning, Teaching and
Assessment policy
- Professional Learning Offer for school leaders on strategic leadership of elements of LTA
Policy
- Themes identified as part of Visit 2 activity (Focus 2.3) support ongoing LA Self evaluation
of strengths and areas for improvement to inform the final Policy.
- Ongoing stakeholder engagement to inform final policy. 
- Final LTA Policy agreed for all school engagement during session 2023/24
- Consultation with school leaders and networks to inform professional learning
offer for session 2023/24
1.2.5 Develop and pilot an
effective tracking and
monitoring system,
incorporating development of
stretch aims. 
- Final phase of evaluation of the new system in primaries, with work ongain to enage with
secondary schools. Review and consultation with working group and schools involved with
pilot planned for secondary’s in next quarter.
- Any significant or minor changes to the approach have been made before full
implementation in all schools next quarter.
- Training programme on the system to be planned and scheduled with all schools.
- Full implementation of final tracking system in all schools.
- Training programme on the system to be planned by ASG and data
champions to take forward ownership within the school.
1.2.6 Support schools and
settings to make best use of
digital tools to enrich, enhance
and improve learning, teaching
and assessment
- Implement innovation project work- Supporting Music Technology in the Senior Phase
- Implement innovation project work- Supporting Computing Science Qualifications in the
Senior Phase
- Continued work on iPad Creativity Apps in the Secondary Classroom
- Continued work on Future Classroom
- Further development on Data Science Across the Curriculum
- Review impact of all Senior Phase innovation project work, evaluate progress,
plan next steps
- Managed transition of all devices and reallocation of school leavers’ devices 
- Further development on Data Science Across the Curriculum 
1.3 Reduce the attainment gap between the most and least deprived children, including care-experienced children. 
Trend Data & Targets 
2018 2019 2020 2021 2022 Ave. Target
Pr Literacy – GAP FSM vs. No FSM 22.47% 29.35% NC 32.24% 26.83% 28.17% a 22%
Pr Numeracy – GAP FSM vs. No FSM 20.69% 22.69% NC 27.98% 24.29% 23.82% a 20%        
S3 Literacy – GAP FSM vs. No FSM 22.57% 22.83% NC NC 28.88% 22.94% b 17%
S3 Numeracy – GAP FSM vs. No FSM 12.04% 21.27% NC NC 22.19% 16.35% b 17%        
1+ @ Level 4 – GAP FSM vs. No FSM  4.9% 2.0% 3.2% 0.9% 3.4% 2.5%
1+ @ Level 5 – GAP FSM vs. No FSM  23.6% 25.2% 19.8% 23.1% 22.9% 19%
1+ @ Level 6 – GAP FSM vs. No FSM  30.7% 32.0% 35.0% 41.4% 32.6% 30%
a Ave. is calculated from 2017-2021; b Ave.  is calculated from 2017-2019
NC – not collected 
Page 61 of 258

Page 62

10
Key Actions Q4 – Completed activity Q1 23/24 – Planned activity
1.3.1 Build quality and capacity
within schools to improve
outcomes for all disadvantaged
children and young people, in
partnership with our Education
Scotland Attainment Advisor.
- Schools continue to monitor the impact of interventions and universal offer on
reducing the attainment gap. Visit 1 and 2, support for schools identified through
Capacity/Risk Register ongoing. 
- Tri-annual report with data analysis focus complete
- All schools now have access to the data dashboard which will enable and analysis of
trends and gaps to inform priorities and planning.
- Summary report to capture the impact of interventions and universal offer on
reducing the attainment gap.
1.3.2 Robust plans for PEF
implemented and evaluated
across all schools.  
- Schools evaluation of  impact of PEF plans ongoing and evaluations discussed with
HTs prior to end of year school quality & improvement report (SQIP) being finalised
- Survey completed to detail school use of therapeutic services. Procurement
framework being developed in relation to therapeutic services offer
- Revised PEF plan being developed and draft shared with school leaders.
- Analysis of PEF spend and AA discussions with targeted schools.
- Schools evaluate impact of PEF plans in end of year school quality &
improvement report (SQIP)
1.3.3 Improve availability,
accuracy and use of complex and
intersectional data to target
support more effectively. 
- Monitor and review the impact of the system within and throughout the schools. Any
significant or minor changes to the approach to be made before full implementation
in all schools next quarter. (align with 1.1.4 and 1.2.4)
- Training programme on the system to be continued with all schools.
- Use of Progress & Achievement module for all primary schools to ensure robust
tracking of predictions, will continue to be trialled. Schools inputting information for
discussion with QIMs in January.
- Full implementation of final analytical dashboard to align with tracking system
in all schools.
- Training programme on the system to be planned by ASG and data champions
to take forward ownership within the school.
1.4 Improved outcomes for vulnerable children and young people, and for those experiencing barriers to learning 
Trend Data & Targets 
2018 2019 2020 2021 Ave. Target
Pr Literacy - LAC/ASN Pupilsa  55.58% 53.26% NC 43.66% 47.61%a 53%
Pr Numeracy - LAC/ASN Pupilsa 61.48% 58.64% NC 52.18% 55.42% a 58%       
S3 Literacy - LAC/ASN Pupilsa 68.66% 87.67% NC NC 78.17% b 78%
S3 Numeracy - LAC/ASN Pupilsa 72.64% 68.32% NC NC 72.77% b 72%       
1+ @ Level 4 - LAC/ASN Pupilsa 91.79% 91.21% 92.95% 89.34% 91.32% 91%
1+ @ Level 5 - LAC/ASN Pupilsa 63.43% 69.23% 69.80% 67.44% 67.47% 69%
1+ @ Level 6 - LAC/ASN Pupilsa 32.09% 32.60% 43.96% 39.77% 37.10% 40%
a This contains pupils that are either LAC or ASN. Note that due to the small numbers in these categories the % can fluctuate quite significantly.
NC – not collected 
Key Actions Q4 – Completed activity Q1 23/24 – Planned activity
1.4.1 Embed The Promise across the
education service 
- Care experienced data dashboard now created to track and monitor attainment
and attendance.
- Schools are embedding relationship/trauma based practice
- Draft managing exclusion policy created ensuring no formal or informal
exclusions of care experienced young people occur
- Midlothian’s parent and carer survey reports that parents/carers feel
involved in the decision making process when planning the
educational outcomes for a CYP
- Midlothian’s pupil survey reports an increase in the % of learners
reporting that they receive the right support at the right time
- New exclusion policy to be implemented August 2023.
1.4.2 Improve availability, accuracy and
use of complex and intersectional data to
identify the attainment gaps for young
people with additional support needs and
other barriers to learning.
- School leaders use the intersectional data to produce an annual school
equalities report within SQuIP and set out what action they will take in the year
ahead to reduce equalities issues. 
- All schools to use the tracking and monitoring system to understand
and target interventions to young people
Page 62 of 258

Page 63

11
1.4.3 Pilot resource guidance: ‘Identifying,
Assessing and Providing for Additional
Support Needs’. 
- Inclusion Framework, inclusion policy and updated paperwork and guidance
has been drafted.
- Consultation process for the policies and framework.
- Pilot phase with the paperwork to gain feedback, ensuring new
processes are ready for launch in August 2023. 
1.4.4 Establish an Education Resource
Group to ensure a timely multi-agency
response to assessing and providing for
young people’s additional support needs.
- N-P1 request for support transition panel and all children placed within local
areas where possible and appropriate.
- ERG process has highlighted high levels of unmet needs relating to social,
emotional and behavioural needs. Scoping activity underway to learn from
national best practice.
- QI visits have focused on the assessment of need and response to providing
support
- Staff survey to measure the effectiveness of the new procedure and
measure impact on the CYP
1.4.5 Review Support for Learning practice
to ensure capacity of workforce,
consistency and quality.
- QI visits have focused on the SfL practice and meeting learners needs.  - Scoping exercise to identify support for learning training to upskill
workforce.   
Midlothian Single Plan Priority Reducing the gap in health outcomes 
Priority 2: Included, Involved and Engaged: Wellbeing & Equity 
2.1 Improve Equity and Inclusion 
Trend Data & Targets 
2018/19 2019/20 2020/21 2021/22 Ave. Target
Pr Attendance Rate 94.43% 94.70% 94.04% 95.06% 94.56% 95%
Sec Attendance Rate 89.18% 89.20% 89.37% 90.99% 89.69% 91.5% 
Key Actions Q4 – Completed activity Q1 23/24 – Planned activity
2.1.1 Extend professional learning offer to
promote nurturing, trauma-informed
practice across schools and settings.  
- Nurture leads and practitioners from across the directorate have worked on
development of framework for Relational Practice to define Midlothian
approach, tools and resources. . 
- Initial scoping activities underway into the supervision and support needs of
those staff working with children presenting with significant emotional
distress.
- Launch the Framework for Relational Practice and professional learning
resources and reflection tool for teams.
- Participation event to be set up with children and young people to explore
what is important to them in relation to relationships and wellbeing.
- Shadowing opportunities to follow on from the Reflective Practice Framework
completion.  
Review of learning and identifying needs to inform planning for 2023-24.
2.1.2 Revise Attendance Strategy in
partnership with Children’s Services 
- Revised attendance procedures being shared with relevant stakeholders for
feedback.
- All schools now have access to a data dashboard that enables analysis of
attendance trends and gaps to inform priorities and target support more
effectively.
- Engagement activity with Head teachers and partners to inform practice,
pathways and partnerships to promote attendance and re-engagement. 
- Procedures to be finalised along with guidance for Children Missing
Education, Flexi-schooling and Build up Timetables.
- Participation event to be set up with children and young people to explore
what is important to them in relation to attendance and what kinds of support
are effective.
- Pathways to be drafted for children and young people across the spectrum of
non-attendance in partnership with stakeholders.
2.1.3 Develop a comprehensive Family
Learning Strategy
- Strategy agreed and final version will be disseminated. 
- Development of a central source of information about Family Learning offer in
Midlothian.
- Undertake consultation with stakeholders about availability and gaps across
Midlothian. Revisions made to improve awareness of family learning and
engagement in opportunities.
Page 63 of 258

Page 64

12
2.1.4 Develop ASD Strategy  - Set up ASN network to identify issues and priorities and build on inclusive
pedagogy and practice.
- Inclusive classroom training completed with most PTs and Class teachers of
all provisions and enhanced classes. 
- Data set to be developed to inform needs across the spectrum of
neurodiversity. 
- Neurodiversity strategy group to be set up with a focus on developing
understanding of need across Midlothian to inform improvement planning
including authority wide ASD strategy.
2.1.5 Mental Health strategy established  - In process of developing data set to inform priorities in relation to mental
health.
- Mapping of services and capacity has been undertaken as well as
procurement of therapy by schools.
- Allocation of CMHF monies for new year and oversight of counselling service.
- Ongoing development of MH strategy with GIRFEC subgroup.
- Seek children and young people’s views about what’s working and not working
in the support for wellbeing and mental health.  Identify children and young
people reference group to support strategy development.   
2.2 Children have a greater understanding of their rights (UNCRC) and these rights are being met across our establishments
Key Actions Q4 – Completed activity Q1 23/24 – Planned activity
2.2.1 Carry out a Children’s Rights Review
with CYP and staff across Midlothian, set
against the 7 principles of a rights-based
approach  
- Identify and facilitate focus groups of children & young people, families, and
stakeholders.
- Identify schools in each ASG to review in terms of highlighting good practice
and assets to build on within Midlothian.
- Hold Parent Conferences and gain views around the long-term aims/vision of
taking a rights-based approach in Midlothian, to feed into Children’s Rights
Review.
- Collate, analyse & evaluate data from reviews.
- Create feedback summary from reviews per ASG (including next
steps/recommended actions)
- Attend ASG meetings to share feedback summaries with HTs. 
2.1.2 Develop and implement the
Midlothian Children’s Rights strategy
across the Directorate, in partnership with
Children’s Services & CLLE. 
- Meet with Steering Group consultation teams to revisit the long term aims
and vision as thinking progresses.
- Start to hone into where Midlothian would like to be in 5 years’ time.
- Create Happy, Safe & Thriving (HST) ASG working groups.
- Create terms of reference for HST ASG working groups.
- HST ASG working groups to analyse feedback summary and create action
plan/next steps for their ASG in terms of professional learning. 
- Follow-up focus groups about Mental Health & Wellbeing Survey with S4-S6
about exam stress, and S1 transitions, to feed into ASG working groups
connected with implementing the Midlothian Children’s Rights Strategy. 
- HST working groups to implement actions created. 
Page 64 of 258

Page 65

13 
Priority 3: Self-improving Systems  
3.1 Leaders at all levels work together within an empowered system to improve outcomes for children, young people and families 
Key Actions Q4 – Completed activity Q1 23/24 – Planned activity
3.1.1 Comprehensive professional
learning opportunities to improve quality
of leadership at all levels, including
leadership of learning. 
- Phased introduction of Professional learning Academy offers.
- Delivery and evaluation of SEIC leadership offer.
- Proportionate support for schools to complete their self-evaluation and
preparation of the 2023-24 school standard and quality report.
- Planning for 2023-24 leadership (HT, DHTs and emergent leader programmes)
- Arranging induction and mentoring for new HTs
- Surveying school leaders and their teams to identify their professional learning
needs for 2023-24 school year. Preparing these professional learning
programmes. 
- (Re) establishing self-sustaining professional networks with support from the
Professional Learning Academy.
- Filming professional learning resources for the “Anytime Learning” section of the
Professional Learning Academy Google site.
- Planning in-service day professional learning for teachers, support staff and early
years staff groups
3.1.2 Deliver a minimum data set and
support data literacy to improve self-
evaluation through leadership
professional learning and data
champions. 
- Final refinement of data champions network to be established in-line with
the full implementation of plan for next session 
- Data lead for Midlothian attends the SEIC Data & Analysis Network 3-
monthly meetings where good practice and support is shared.
- End of year evaluation and co-create 2023-24 activities.
- Develop programme of training with professional learning academy for 2023-24. 
3.2 Children and families participate in, influence and inform how we deliver our services 
Page 65 of 258

Page 66

14
Key Actions Q4 – Completed activity Q1 23/24 – Planned activity
3.2.1 Refresh the Midlothian Parental
Involvement and Engagement Strategy.
Co-create this with Midlothian parents
using the National Community
Engagement guide. 
- Parent focus groups on National discussion, 10 in total both face to face and virtual.
- Guidance created to ensure consistent support for PC chairs to carry out their business
and meetings/format and consistent approach to parental engagement in recruitment.  
- Involvement in EYs and Education reform consultation through focus groups. 
- Parent Conference planned for June. 
- Parental Engagement Strategy co-created with PC reps group and consultation being
carried out with wider stakeholder group.
- Parental Involvement and Engagement report  co-created with PC reps group and
consultation being carried out with wider stakeholder group. 
- Parental Engagement Strategy and Parental Involvement
report  shared across locality groups
- Creation of PIE steering group and co-creation of action
plan.
- Use PC Equalities Audit to adjust PC guidance,
recruitment & promotional materials.
3.2.2 Learner Engagement Strategy  - Learners views and opinions were included in various consultations throughout this
session linked to service improvement priorities and National Conversation on Education
for Scottish Government.  
- Learners involved in the recruitment of senior staff leading their school community. 
- Learners were involved in creating letter of intent in relation to the Period Act and can
access free products.
- Learner conference planned for June 
- Learner Engagement Strategy co-created with learner
group
3.3 Quality Assurance activities lead to improvements in the quality of education provision across settings and schools 
Key Actions Q4 – Completed activity Q1 23/24 – Planned activity
3.3.1 Quality Improvement framework in
place 
- Schools and ELC settings implement the QA Framework.
- Feedback via EEG on visit 2 activity. 
- Evaluate the QA Framework with head teachers and
centre managers at the end of year. 
3.3.2 Programme of quality assurance
activities 
- QA visit 3 provides schools, ELC settings and LA with a clear picture of
progress in raising attainment as well as improvement over time.  
- Final QA programme agreed and in place for future
sessions, able to support with provision of clear
information regarding  capacity for improvement for our
schools and ELC settings related to key QIs. 
Midlothian Single Plan Priority Reducing the gap in economic circumstances  
Priority 4: Life-Long Learning and Career-Ready Employability  
4.1 Children and young people are well prepared for the world of work 
Key Actions Q4 – Completed activity Q1 23/24 – Planned activity
4.1.1 Analyse opportunity data to inform
which careers offer the best opportunities
for Midlothian’s CYP over the next 10 years. 
- Collaborative enquiry complete and the report has been written, with work
ongoing to finalise the action Plan. Work to progress on School College
Partnership, Foundation Apprenticeships, links through City Deal (University
link) and collaboration via digital across schools.
- 16+ Data Hub practice paper developed and training for schools being
rolled out.
- School 23/24 SIPs reflect this approach
Page 66 of 258

Page 67

15
4.1.2 Embed My World of Work (MWoW) into
the curriculum of every school 
- Collaborative Improvement plan in place with associated Action Plan.
- Shared with all senior leaders at HT meeting
- Reflected in the Curriculum Framework document and
rolled out in relation to agreed timeline
4.1.3 Further develop bespoke Skills
Development Scotland tutor and mentoring
support for senior phase secondary
students
- Support remaining schools to provide tutor and mentor support. 
- Meet with SDS to target support where it is needed. 
Priority 5: Finance & Resources  
5.1 Deliver Best Value through: 
Key Actions Q4 – Completed activity Q1 23/24 – Planned activity
5.1.1 Learning Estate  - Elected members seminar covering the LEIP (Learning Estate
investment Plan) projects of Beeslack HS and Penicuik HS. Paper to go
to June 2023 Council
- Statutory consultation underway for the new Easthouses PS. 
- Public open help to present the vision for the new Mayfield Campus.
- Council agreed to procure modular units for Kings Park, Rosewell,
Roslin, Woodburn primary schools’ and Lasswade ASN.
- Continue to plan and deliver the agreed Learning Estate
priorities.
- Provide milestone updates to relevant governance
groups.
5.1.2 DSM Review  - Complete the DSM consultation.  - Continue comms and roll-out of DSM 
5.2 Equipped for learning: 
Key Actions Q4 – Completed activity Q1 23/24 – Planned activity
Transformation 
Devise and deliver Phase Two of the Equipped for Learning
project to ensure positive, sustained impact for children and
young people 
- Delivery of workstream actions as detailed in EfL Phase Two
project plan
- Delivery of workstream actions as detailed in EfL Phase Two
project plan
- Review of Phase Two and scoping for Phase Three
Page 67 of 258

Page 68

16
Asset Management 
Confirm asset management strategy including
investigating provision of a device when a pupil leaves
school and develop agreed deployment plans then
Implement. 
- Monitor refresh schedule to be developed and implemented. AV refresh schedule to be developed and implemented
Storage and Back Up 
Review/update record management policy, confirm
document management approach, tidy data in line with RMP,
migrate data to central servers and then decommission old
servers;  explore back-up solutions for email and
drive/workspace, confirm solution and implement. 
- Centralise storage on centrally managed servers.
- Assess volume of storage required on the basis of the
outputs of the data cleanse process
- Assess options - servers held in high schools on behalf of
primaries vs servers held centrally on behalf of all schools
- Procure and implement new hardware
- Migrate data from existing servers to new servers 
Security 
Identify a solution/tools MDM, DLP and Other to prevent
data from being copied into a personal app. Investigate
& implement CASB, 2FA & Data
Classification within Workspace
- Identify Security work packages that need third party support
/ procurement
- Identify MDM / DLP tools and solutions to prevent data
being copied out of the workspace onto personal apps
- Investigate alternative inbuilt controls to overcome MDM
risks in non-Windows/Chrome user environments 
Network and Wifi 
Develop Network Wi-Fi requirements, develop Network/Wi-Fi
forecast model with scenario planning capability
to proactively plan capacity.
Wholesale update of Wi-Fi Network  
Audio Visual 
Define how teachers could/should use Chromebooks and
AV for each type of learning setting. Define requirement for
AV service offering.
- Conduct change management in all schools
- Procure all hardware through Scotland ESL Framework
- Agree installation plan with chosen supplier
- Review support arrangements for software updates 
- Carry out installation
Identity 
Build a case for change, develop options assessment and
business case. Implement simpler corporate wide identity
solution to education
- Review interim arrangement for managing issues related to
accounts and identities
- Implement identity solution 
Support 
Review support processes, where best placed to sit. Update
Service Now to allow Digital Learning access. Confirm
Governance process on managing and tracking of assets. 
- Assess the viability of using Service Now to deliver Digital
Learning support functions
- Carry out trial run of Service Now for delivery of support
functions
- Carry out change management for migration to Service
Now
Potentially migrate Digital Learning support functions to
Service Now 
Page 68 of 258

Page 69

17
02. Challenges and Risks
22/23: 
- Outcome of the Education Reform Consultation and National Care Service Consultation 
- Uncertainty about how SQA qualifications will be assessed going forward in the future. 
- The continuing impact of the pandemic on attendance and on post-school destinations 
- Midlothian Council has a relatively high proportion of funded ELC places delivered by partners in
the private and voluntary sectors. As such, any increases in the rate that is paid to funded providers
would create additional upward pressure on the early year’s budget for 2022/23. 
- Rate of demographic growth on the learning estate 
- A full refresh of school roll projections and capacities has been undertaken to assess current and
future demand. This work will inform and shape the Learning Estate Strategy over the next 5 years. 
- A number of schools funded through the Scottish Governments Learning Estate Investment
Programme are at the briefing and design stages. There are council and developer funded projects
being undertaken also. An elected member’s seminar was held to present an update of the Beeslack
CHS and Penicuik HS projects.
- The Roll Projection data will be checked and refreshed on a 6 month basis to ensure we have
provided sufficient capacity in each catchment. There are a number of schools with imminent
capacity breaches.
- A programme of Suitability Surveys will be conducted in 2023 to ensure our Core Facts data is
reflective of the current situation. 
- The Place Directorate are planning on conducting Condition Surveys in all schools assets. 
- Increase in the number of children and young people with additional support requiring more
specialist provision will require robust monitoring to ensure staffing and specialist facilities meets
level of needs  
- There are a number of Scottish Government consultations, on issues such as school uniform and
physical restraint, that are ongoing which may result in change in education policies for this coming
session and beyond. 
- There is a financial challenge to deliver statutory services given the current budget gap.
- Due to the current financial climate there may be an impact on services as a result of the cost of
living and increase in poverty. 
Page 69 of 258

Page 70

18  Page 70 of 258

Page 71

1
Place Performance Report 2022-23 
Place is where people, location and resources combine to create a sense of identity and purpose. The
Place service ambition is to deliver joined-up, collaborative, and participative approaches to services,
land and buildings, across all sectors within a place, enabling better outcomes for everyone and
increased opportunities for people and communities to shape their own lives. 
Achievements 2022-23 
In response to the 2021/22 Planning Performance Framework submission, the Scottish Government RAG
rating feedback report (December 2022) on the 15 performance markers which form the basis of the
assessment of the Council’s Planning Service, for the first time rated all 15 markers ‘green’ giving no cause
for concern.  None were rated as ‘amber’ which are areas of identified improvement or ‘red’, this being
used to indicate where some specific attention is required.  This was reported to Planning Committee at its
meeting of February 2023. 
Following the adoption of the National Planning Framework No.4, the Service has formally commenced its
review of the Council’s adopted spatial strategy, the Midlothian Local Development Plan – the first phase
consists of engagement with community groups, key agencies, the development industry, local residents
and elected members. 
The Council has adopted a Planning Enforcement Charter which sets out the Council’s policy and approach
on enforcing planning control and addressing breaches of planning legislation. 
Throughout 2022/23 the Planning Committee has determined to grant planning permission for a number
of strategic developments which contribute towards the Council’s planning, economic and environmental
objectives, and include:
• The erection of 24 business (Class 4) units, spread across 5 blocks with a total floor space of 4257
sqm; a drive-through coffee shop; with associated car parking, access roads and drainage
infrastructure; and an application for planning permission in principle for a further three Class 4 plots
all situated on land to the south of Sheriffhall roundabout; 
• The erection of a retail food store of 1878sqm floor space (Class 1), formation of access roads, car
parking, and associated works on land at the junction of the A701 and Pentland Road, Old Pentland,
Loanhead;
• The erection of a food retail store and associated works off Edinburgh Road, Penicuik;
• The erection of 100 dwellinghouses and associated works on the ‘Doctor’s Field’, Rosewell;
• The erection of 430 dwellinghouses at land at Cauldcoats, Danderhall;
• The erection of 96 dwellinghouses at land at Newbyres, River Gore Road, Gorebridge;
• Planning permission in principle for up to 926 dwellinghouses and associated works on land south of
Mayfield and east of Newtongrange; and
• The erection of a new Easthouses Primary School. 
The Council has adopted Conservation Area Character Appraisals and Management Plans for the Eskbank
and Ironmills Conservation Area and the Newtongrange Conservation Area and Supplementary Guidance
for Low Density Rural Housing.
Item 5.5
Page 71 of 258

Page 72

2 
With regard the Council’s Economic Development and Business Gateway Service, the primary
achievements have been: 
• Grant funds to support local businesses to the value of £2,980,428 were processed and issued
between March 2020 and September 2022 from the Scottish Government Covid recovery funds; 
• Administering and continuing to process the Community Wealth Building and Green Transition
funds (approximately £304,922); 
• Over 50 businesses have signed up to The Midlothian Carbon Pledge.
• Launched the refreshed Inward Investment Prospectus highlighting Midlothian for business
investment;
• Launch of the first Economic Development quarterly newsletter setting out the opportunities for
businesses and social enterprises; and
• Supported 14 social enterprise projects with four of them already started trading, including the
Energy Training Academy Community Interest Company;
• Shared Prosperity Fund Investment Plan approved and programmes commenced. 
Midlothian Council’s Decarbonisation Project is the first step in retrofitting our existing stock to help reach
our goal of Net Zero. Within this Building Maintenance project, we have installed 165 domestic properties
with Solar Photo-Voltaic panels complete with Battery storage. This provides the householder with 4.8KW
of generated electricity free of charge.   
Within this project, we are also dealing with the hard to heat properties that are experiencing large
increases in Fuel costs due to not having access to Mains Gas. Midlothian Council are retro fitting these
houses with a “Fabric First” approach which includes floor, wall and loft insulation and new energy
efficient windows and doors. In addition to this, we have fitted the same PV panels and battery storage as
above as well as new Air Source Heat Pumps. 
All these measures ensure that these houses will need no further improvements as we move to becoming
Net Zero. 
Across Protective Services: 
• The Food Law Interventions programme by Environmental Health completed 100% of the
inspections planned at the highest risk premises and 97% of the high risk premises in Priority 2
having  undertaken  a total of 321 food inspections 
• 2022-2023 Phase 1 implementation of the Food Standards Scotland (FSS) new Official Controls
Verification (OCV) interventions at approved premises within Midlothian. During the year the
method and recording procedures of these interventions was developed in accordance with
national guidance and all of our highest risk approved premises; manufacturing meat products and
dairy products, were inspected or audited at least twice within the year.
• Trading standards Team were involved in the monitoring of the Avian flu outbreak (principally
amongst seabirds)  and in conjunction with colleagues in the Safety, Risk and Resilience team
ensured appropriate local guidance was available to Council and public
• As a result of active involvement or advice by the Trading Standards Service, refunds of at least
£30,635 were attained by members of the public.
Page 72 of 258

Page 73

3
• Trading Standards staff conducted a number of partnership operations including with Police
Scotland targeting underage sales of nicotine products and Scottish Fire and Rescue Service regards
the regulation of premises selling fireworks. Trading standards successfully seized a significant
quantity of disposable vapes said to have 3,500 puffs each all vastly exceeded the 2ml nicotine
content permitted in the UK. 
• As part of a Scotland-wide project, TS signed up 5 self-storage businesses to comply with a Code of
Practice to prevent the storage of counterfeit goods and awarded the relevant certification.   
• Short-term Let Licensing in terms of The Civic Government (Scotland) Act 1982 (Licensing of Short-
term Lets) Order 2022 was introduced and this required creation of a short-term let licensing
policy, specialist software to administer applications and procedures for the inspection of
properties and the processing of applications. The first applications have been received and
licences issued to those compliant.  It is expected that we will receive 200 – 250 others by 1
October 2023. 
• As part of the approved Environmental Crime Strategy the policy and procedure to deal with
abandoned vehicles was developed and implemented following transfer of this area of
enforcement to the Team in July 2022. 127 requests  for  service were actioned with vehicles being
removed where the law allowed 
• The expertise in relation to Contaminated Land  continued to be utilised throughout the year by
both internal and external stakeholders including Development Control and Building
Standards  with 305 reviews being completed in the year directly contributing to The Midlothian
Council position as the  fastest growing local authority area in Scotland
• The team fulfilled our obligations with regards to the development and launch of the National Dog
Control Database which is now providing better quality information to enforcement agencies,
including Police Scotland, regards dogs considered to be out of control.  
• The regulatory control of private sector housing remained a focus for the team in 2022/23 and in
addition to housing disrepair matters and the registration of residential private sector landlords the
team undertook unplanned work regards Homes for Ukraine Visitors inspecting in excess of 70
properties to ensure safe standards for all guests and hosts. 
• The Authority continued with the recovery phase of the coronavirus pandemic and were supported
by Health and Safety Advisors, The Contingency Planning officer and others across the Service. The
Local Test Site in Dalkeith run by Mitie on behalf of the UK Government was successfully 
decommissioned 
• Appointed the Health, Safety & Resilience Manager in January 2023 which will improve
performance through ongoing work to implement the  health and safety management system, risk
management system, civil contingency, business continuity policies and processes, Public Safety at
events and provision of the Council’s Licensing function and contributing to the key aim  that
individuals and communities in Midlothian will be able to lead healthier, safer, greener and
successful lives by 2030
• The appointment of the  Public Safety and Resilience Officer has resulted in robust engagement
and encouragement in relation to event planning in Midlothian through the Safety Advice Group
• Implementation of Operation Unicorn following the death of Her Majesty Queen Elizabeth II 
• The Licensing service has commenced review to enable the making, receipt and processing of
digital applications 
Page 73 of 258

Page 74

4
Housing Services continues to work to achieve as much affordable housing as possible to reduce the
waiting time for housing applicants in need.    
• Midlothian Council has increased its council properties to 7121 properties (108 new builds);
• We purchased 22 open market properties;
• We let 1029 properties to the waiting list;
• Social Landlords asked us for waiting list applicants details for 222 addresses (113 affordable new
homes);
• We progressed 59 mutual exchanges between tenants. 
The Service let 376 rooms/properties to those in need of temporary accommodation who are
homeless.  This includes supportive housing services tailored to meet the needs of individuals and families
experiencing homelessness including those with mental health, substance misuse, trauma, life skills
training and ongoing case management.  Housing continue to work in close partnership with our partners
in health and social care to ensure those who are most vulnerable are supported.   
The Service is actively looking to reduce the time people spend in homelessness, having reduced this to 58
weeks to close a homelessness case in 2023, compared to 106 weeks in 2022. 
Homelessness prevention assists around 20 households with advice and assistance about homelessness
prevention per week.  This is rental assistance advice, financial awareness advice and mediation. 
WithYOU our tenancy and hostel managing supplier has become a trusted partner and is distributing the
£44,000 LACER funding to our vulnerable tenants.   
Housing Services commissioned Changeworks to provide a Warm and Well programme between
November 2021 and October 2023.  The target is to assist 290 tenants to tackle poverty issues.  To date
this has resulted in savings of £50,884.48 for our tenants. 
Housing is in the process of working with our procurement department around commissioning a Young
Persons support service for two years around sustaining tenancies and prevention of Homelessness 
Across Neighbourhood Services, Road Services delivered £4.5m of works to improve both the main road
and pavement network along with residential streets. A further £1m has been spent converting street
lights to modern LED bulbs to reduce both electricity consumption and carbon emissions. The service
delivered investment in a new road planer, pot hole machine and drain gulley cleaning vehicle. Council
approved a consultation on introduction of 20mph zones across the county to further improve road safety
and work continues on a bid to reduce traffic bottlenecks to improve bus timings and efficiency. The team
put in some hard shifts to keep Midlothian moving during the winter snow and ice.  
The Active Travel team funded by Smarter Choices Smarter Places grant delivered a range of cycle training
initiatives with school children and school streets safety improvement plans. Four projects to improve
active travel safety and infrastructure such as paths are underway funded by a Cycling Walking Safer
Streets grant. 
Page 74 of 258

Page 75

5
Fleet and Travel Services kept the council fleet on the road delivering key services and safely transported
thousands of children daily to school.  
Waste Services re-opened a reuse cabin at Stobhill Recycling Centre for the collection of items suitable to
be used for children's "learning through play." To assist with circular economy work one of the contractors
awarded the following community benefits. Loanhead Bike Refurbishment Project: £750 to purchase
spares to repair bikes for reuse, as well as bike maintenance activities. The Glencorse Centre, Penicuik
£750 for a Sew Far So Good project to support local residents to mend and repair clothes. PlayBase,
Dalkeith £500 to support operating the bric-a-brac reuse cabin at Stobhill Recycling Centre. Six compactor
bins have been installed in a trial.
Land Services installed new play areas at both Danderhall and Kingspark Nurseries along with the planting
of bamboo and willow. Four Queen’s Platinum Jubilee trees were planted at Roslin Park, Viewbank Park,
Arnisiton Park and Pathhead Park. A pump track was installed at North Middleton and Waterfall Park play
area has been refurbished using Scottish Government grant funding. The Ranger Service organised
Midlothian Outdoor Festival which attracted 1072 visitors taking part in walks, talks and activities
throughout the county. Partnership funding was secured from Scottish Water for a Ranger post for
Gladhouse reservoir.  Green flags were awarded to Vogrie Country Park and Memorial Park Loanhead. A
petanque court was installed at Newtongrange Park and the team supported 17 community galas. 
Environmental 
Midlothian Council was one of the first local authorities to sign Scotland’s Climate Change Declaration,
publicly acknowledging the challenges and opportunities that climate change brings with a commitment to
make the Council’s activities net zero carbon by 2030. Work continues to implement the Council’s Climate
Change Strategy and focus continues within Place services to achieve future emissions targets.  The
ambitious strategy sets out how we will reduce our greenhouse gas emissions, encourage and work with
others in our community to mitigate and adapt to changing climate. The strategy incorporates an action
plan with a number of initiatives and ongoing programmes which together are helping to reduce our
emissions and carbon footprint. The annual progress report on Climate Change was presented to Cabinet
at its meeting of 18 October 2022. 
Economic Development continues to promote the Midlothian Business Green Pledge. This year 50
businesses committed to the Pledge, which is now a prerequisite for any businesses looking to secure
grant support from the Local Authority Covid Economic Recovery (LACER) Green fund. Economic
Development worked with pledgers to identify the best platform for group sharing. Through the LinkedIn
group, pledgers are starting to share their experiences and the team continue to share a mix of green
information from partners on learning opportunities, support and funding. 
The Scottish Government’s Heat in Buildings Strategy (2021) sets out its aims and objectives for achieving
net zero emissions within the entire building stock in Scotland by 2045, including addressing poor energy
efficiency as a driver of fuel poverty. As part of this Strategy, Local Heat & Energy Efficiency
Strategies (LHEES) will set out the long-term plan for decarbonising heat in buildings and improving energy
efficiency across an entire local authority area. The Strategies will draw on a standardised methodology to: 
Page 75 of 258

Page 76

6
Set out how each section of the building stock needs to change to meet national objectives, including
achieving zero greenhouse gas emissions in the building sector, and the removal of poor energy efficiency
as a driver of fuel poverty;
• identify strategic heat decarbonisation zones, and set out the principal measures for reducing
buildings emissions within each zone; and
• prioritise areas for delivery, against national and local priorities.
In conjunction with consultants, Midlothian are now at Stage 4 of the methodology and are currently
reviewing the findings and in discussion with key stakeholders regarding the confirmation of data, and
identification, review and potential priorities. 
Work continues with Midlothian Energy to develop business case options for addressing building fabric
and energy decarbonisation of the existing estate. The site has been secured for the new Midlothian
Energy Centre at Millerhill, as a key step in the delivery of District Heating at Shawfair.  The energy services
agreement with Shawfair LLP received shareholders consent in December allowing closure of the deal to
supply and manage heat distribution for Shawfair. The conclusions of the heat offtake agreement at
Millerhill waste and recycling plant allowed the signing of the design and build and operating and
management agreements for the energy centre and undertaking of the installation of the distribution
network. Contractors are now appointed and work progressing with groundworks.   
The annual Capital Works Programme for carriageway resurfacing combined with the Residential streets
programme continues to make good progress this quarter with 20.10km of carriageway resurfaced over
this year (2.89% of the total road network) with our annual target of resurfacing 2.2% of the total road
network being exceeded. In addition, 7.26km of footways were resurfaced this year (1.02%), exceeding
our annual target of 0.6%. In addition, there has been significant capital investment in modern road
maintenance equipment including a road planer to remove the surface of roads, specialist rollers, road tar
hot box and mobile welfare facilities for staff. The purchase of a JBC Pothole Pro (PHP) will play a key part
in recovering our road and footpath network going forward. 
Successful procurement of new contracts for both lighting capital and traffic signal maintenance will
deliver best value for the service. Due to late procurement of these contracts this year, funding has been
diverted to the delivery of 1,796 new LED lanterns, anticipated to be completed in May. As a result, 136
lighting column replacements were installed this quarter with a further 403 units expected to complete in
July. 
This year we ran a consultation on our Electric Vehicle charging network to gather feedback on providing
accessibility, reliability and affordability of a charging network across the Midlothian area.  The
consultation will shape our Electric Vehicle Infrastructure strategy and expansion plan in 2023. A business
case has been developed and considers the expected future increase in EVs and associated need for
additional chargers throughout Midlothian. It also sets out possible funding options and what the future
EV charging network could look like. 
Work continues in Waste Services on an options Appraisal with Zero Waste Scotland to consider how
waste/recycling might be collected in the future considering the Household Waste Charter, and the
impacts of both the planned Deposit Return Scheme and Extended Producer Responsibility. Planning is on-
going regarding the potential impacts on the service, particularly the kerbside glass collection service. 
Page 76 of 258

Page 77

7
Target containers returned to retailers or reverse vending points will mean less is collected in kerbside
glass boxes and blue bins which will affect our recycling rates. 
The Garden waste service re-started on the 13th of March with 13,463 customer already signed up to the
service (14,707 customers at same time point in 2022). 
As part of Scottish Government capital spend on play improvements, 20 play areas have been upgraded
mainly consisting of replacing old and worn equipment. Play areas at Danderhall and King’s Park Nursery
were completed this year with new play equipment and planting. Waterfall Park refurbishment is now
complete and North Middleton Pump Track Pump track completed and is being well used by the
community. Other works in progression include Burnbrae Primary School, Penicuik Park and Millerhill Park. 
The Countryside Ranger Service continues to engage with communities and volunteers on various
initiatives such as the Midlothian Outdoor Festival, attracting 1,072 visitors taking part in walks, talks and
activities throughout the county. Tree survey work was completed on Penicuik to Dalkeith walkway,
Springfield Mill and Straiton pond. In addition, the ranger service secured partnership funding with
Scottish Water for a ranger post at Gladhouse reservoir and delivery of equipment as part of the Scottish
Government Nature Restoration Fund for biodiversity which will be utilised for maintenance of grassland
and wild flower meadows. Extensive biodiversity works were completed to restore 2 ponds at Vogrie and
Straiton. A new pond was created on the Penicuik to Dalkeith walkway.  Green flags were awarded to
Vogrie Country Park and Loanhead Memorial Park. This year 5,604 volunteer hours were spent in
countryside sites ensuring an attractive, safe and welcoming environment for all to enjoy. 
Overall grounds maintenance standards have been good this year.  Working towards Midlothian’s aim to
be Carbon Neutral by 2030, Land Services purchased additional battery powered small plant and
machinery and a large charging unit which records and reports on carbon savings made. In Q2 the
operation of Pellenc battery operated equipment resulted in a 334.8kg reduction in Co2 emissions and
also provided an equivalent saving of £223.00 in fuel costs. 
Public Health and Environmental Protection implemented the short-term let licensing scheme within the
time scales prescribed by Scottish Government.  To date only a handful of applications have been received
but plans are in place to proactively contact known short-term let hosts early this year to remind them of
the deadline for their license application and publicise the scheme further on our social media platforms.
This quarter, software was implemented which is now integrated with the Council’s website allowing hosts
to apply and administer their application by 1st of October 2023. 
Air Quality Progress Reports for 2020-21 and 2021-22 were submitted to Scottish Government on 31st
October 2022 for appraisal.  Our Air Quality monitoring programme which had been suspended due to
resourcing issues has been successfully restarted. Work has now began on the 2022-23 report. 
An Abandoned Vehicle Procedure, introduced during 2022, continues to be refined this quarter but is
working well. Officers are having a lot of success in contacting owners early in the process prior to having
to go to formal notice by affixing ‘awareness’ notices at their first visit to the vehicle which encourages the
owners to contact us. This allows the owner to informally deal with the issue before moving to formal
notice. In addition, DVLA access that been achieved this quarter for searches of keeper details for vehicles
Page 77 of 258

Page 78

8
reported to the authority as being abandoned. This is resource which can now be used for other
authorised uses within our jurisdiction such as fly tipping and littering. 
Economy & Regeneration 
Midlothian Council’s Economic Renewal Strategy sets out our ambitious approach to managing the
transition from lockdown and planning for the longer term challenges the local economy will face. The
strategy aims to mitigate the adverse economic impact on the local economy from COVID-19. Key aims
are to protect jobs and aid business recovery using a place based partnership approach that maximises
the opportunities developing from the pandemic. Taking this partnership approach, the strategy will
foster entrepreneurship, upskilling and training, addressing gaps in the market and changing the way
business is done to better align this to customer behaviour. Alongside support for agriculture, tourism
and the leisure and hospitality sectors, the council will also promote local jobs and self-employment
opportunities, particularly for young people, to give them the necessary skills and support they need to
benefit from economic recovery. A report on EU-Exit impacts and the economy was presented to Council
in October and work is ongoing with Ekosgen which will inform the refresh of the Economic Strategy to be
presented for approval to Council in Q1 2023/24. 
The Business Gateway team continue to promote localised procurement with clients, encouraging
registration with the Supplier Development Programme and Public Contract Scotland (PCS).  We actively
encourage businesses to register with the Supplier Development Programme which provides access to free
training and support in all aspects of public sector tendering to improve the tender readiness of local
suppliers.   
Working with our Procurement Team, we identify upcoming procurement opportunities, promoting local
procurement opportunities via our digital channels and for those that we know suit a specific business we
contact the client directly. Support via the teams Procurement Mentor is available to clients via the
Business Gateway Adviser. We also proactively identify regional and national opportunities that suit our
client base on PCS.  
Events, mainly those by the Supplier Development Programme, are also shared with local businesses and
across our social media channels to support local businesses to become “tender ready”. 
A Meet the Buyer event was held at Newtongrange Mining Museum on 29th March regarding Midlothian
Council’s upcoming building/roofing framework and was attended by Economic Development, Business
Gateway, Procurement and the Building Maintenance Service.  The event was attended by 24 people from
businesses in the local area.  Without requesting feedback we received very positive responses from
attendees, more meet the buyer events are planned in support of the Local Procurement Strategy and the
transition to a wellbeing economy. 
The Business Gateway service continue to promote the social enterprise model to clients where their
plans, objectives and values align to the model. Contributing to Community Wealth Building objectives, the
team continue to support the projects from Social Enterprise Conversation sessions as they develop. The
“Newtongrange Development Trust and a Social Entrepreneur” session was held last quarter and two
Social Enterprise Conversations were held in Bonnyrigg and Roslin (and surrounding areas) this quarter.
Projects being supported from these sessions include:
Page 78 of 258

Page 79

9  
• A start up social entrepreneur now accessing business support to take forward their idea.
• Existing business owner starting a new venture and considering social enterprise.
• Existing charity exploring income generation.
• One participant signed up to join Wellbeing Business Association. 
Each of these projects will become income generating social enterprises and are presently working with
the Business Gateway team on legal structure, identification of revenue streams, local and national
referrals/introductions with connections made to existing social enterprises where a collaborative
opportunity is identified. 
In addition, two Expert Help Programmes (HR Support & Financial Management) launched on 28th
February 2023. The Expert Help programme provides consultancy support in specialised areas to
businesses in Midlothian. 6 clients have been referred to each programme. 
The Locate in Midlothian website continues to be a valuable tool for employability opportunities and
employment support with 37 property enquires received via the site during Q4. All enquirers were
contacted by Business Gateway advisors to offer wider support.  In total the team have received 138
enquires this year. The Locate in Midlothian website received 10,095 visits from 1st of April to 10th of
November 22. (It should be noted that website visits for the remainder of the year cannot be reported on
at present due to a switch in software, reporting issues are being progressed with the developer). Each
social media channel is targeting different audiences and each is performing well in terms of audience
growth and interaction with 1,880 ‘Business Gateway Midlothian’ followers and 1,676 ‘Locate in
Midlothian’ followers across Facebook, Twitter and Linkedin.   
The level of Business start-ups has increased from 6 in Q2 to 63 in Q4, most of these had accessed pre-
start support in 2021/22 and some from earlier this financial year. This reflects the continued and focused
activity of our dedicated Start Up Adviser and broader economic trends including: 
• Part time work sufficient before but not during cost of living crisis. 
• Developing “side hustles” in order to create additional income to cover gaps in earnings, whilst
remaining in employment.
• Redundancies or threat of job loss motivating clients to investigate self-employment. 
The total number Business start-ups this year was 118. This should realise a forecasted creation of 142
jobs, with quarter 4 jobs forecasted to be 74. 
The Local Authority Covid Economic Recovery Fund (known as LACER) provides grants to support
businesses, social enterprises and tourism in Midlothian. Funding allocation has been spilt across the
following areas: 
• Social Enterprise Start and Grow fund with £8,000 awarded 
• Tourism, Culture & Heritage Officer £43,859 – recruitment has commenced
• Tourism Support £10,000 – now allocated 
• Green Transition Fund with £113,983 awarded 
• Business Associations £15,000 – funding not yet drawn however emerging business associations in
Penicuik and Gorebridge with theme of Green Trades, Wellbeing and Food/Drink. 
Page 79 of 258

Page 80

10 
We have continued to maximise opportunities to support recovery of the tourism sector by supporting the
development of the tourism forum’s digital presence and representation on the steering group. The
£10,000 grant to the Midlothian Tourism Forum as set out above has allowed the forum to design and
build a website to increase membership and interest. This is due to go live in May. The new Economic
Strategy planned for 2023 approval will include Tourism, Culture and Heritage.   
Following the 2021/22 Planning Performance Framework submission to the Scottish Government, the RAG
rating feedback report was received in December 2022 and for the first time all 15 performance markers
were rated ‘green’ giving no cause for concern. The 15 performance markers form the basis of the
assessment of the Council’s Planning Service and as a result no areas were identified for improvement and
no indications where some specific attention is required. 
Following the adoption of the National Planning Framework No.4, the Service has formally commenced its
review of the Council’s adopted spatial strategy, the Midlothian Local Development Plan – the first phase
consists of engagement with community groups, key agencies, the development industry, local residents
and elected members. 
Housing and homelessness 
Midlothian Council’s updated Rapid Rehousing Transition Plan (RRTP) sets out key actions for delivery this
year and addresses the next phase in transforming the services provided to meet housing need. These
activities are crucial to reduce the time spent in temporary accommodation, improving the quality of
temporary accommodation provided, continue to deliver Housing First and improve the health and
wellbeing of those most vulnerable households. The plan also explains how Midlothian Council will
address the next phase of its approach to transforming the services provided to those in housing need by
developing initiatives with an emphasis on the prevention of homelessness, tenancy sustainability and
early intervention. 
There continues to be a significant demand placed on homeless and temporary accommodation services.
A potential key challenge will be an increase in homelessness as the financial measures put in place to
protect households during the pandemic are now withdrawn, alongside the recent increase in energy,
food and fuel costs, requiring a comprehensive preventative approach as set out in the Council’s Rapid
Rehousing Transition Plan. Homelessness is not inevitable and can often be prevented.  Our vision is for
everyone to have a safe, warm and affordable home that meets their needs.  Working with our partners to
prevent homelessness from happening in the first place. 
With the change in The Homeless Persons (Unsuitable Accommodation) (Scotland) Amendment Order
2020, we have transformed temporary accommodation in Midlothian, so no children will be in a B&B,
hotel or hostel accommodation for more than 7 days. 
On 29 November 2022, the Homeless Persons (Suspension of Referrals between Local Authorities)
(Scotland) Order 2022 came into force. This gives people in housing crisis the freedom to settle where they
choose with access to the support they need, and aims to help them integrate more fully into the local
Page 80 of 258

Page 81

11
community and to reduce repeat homelessness. With both of these significant changes to homelessness
legislation adding challenges to the service, we have not breached these orders. 
The number of applicants requiring temporary accommodation has increased this quarter to 162 new
cases, reaching a total number of households in temporary accommodation at quarter end of 322. The
number of cases provided with advice and assistance, and prevented from homeless was 978 and 333
clients. We continue to promote this service to ensure early successful intervention when possible. 
There were 4,612 active housing applicants placed on the Common Housing Register at the end of this
reporting period. The total number of lets made to the general needs applicants this year was 184 and 291
made to homeless applicants. As a snapshot, on the 31st of March we had allocated 322 rooms/properties
for those in need of temporary accommodation. This year we purchased 22 open market properties, and
progressed 31 mutual exchanges. This year’s abandoned tenancy rates remain low at 0.08% of our housing
stock. Preventative measures and tenancy support have ensured our eviction rates for this year remain
low at 0.01% of our stock. 
Re-let time for permanent properties has decreased to 24 days this quarter compared to 45 days at the
start of the year in Q1. 
The first year review of the Homeless Prevention Forum took place this year.  This is a partnership
arrangement established 2021, with an aim to reduce children going into homelessness through
evictions.  Referrals are triggered within Midlothian Council when there is risk of eviction.  
The new hostel accommodation at Jarnac Court was opened providing both accommodation and support
to our applicants. This newly refurbished site has 22 rooms for temporary accommodation for our
homeless customers. 
The Scottish Housing Regulator met with Housing Services to review and discuss our engagement plan
surrounding homelessness and health and safety within our tenancies. In addition, the Scottish Housing
Network concluded a benchmarking exercise against similar sized Local Authority Housing teams.  Both
meetings praised our material improvements around housing and homelessness and supported the
continuation of engagement going forward.   
Throughout the year we have worked to better improve communications with our housing applicants and
tenants, housing duty telephone lines were moved onto the main council Liberty telephony system
allowing call recording and ability to report on call handling performance. New private meeting room
spaces were opened in Midlothian House for customer engagement. As part of the Midlothian Council rent
consultation which presented options for all tenants and waiting list applications on setting next year’s
sent levels, a series of five public meetings were held across various locations in Midlothian which were
promoted by staff, social media and text messaging.   
Work continues as part of the resettlement scheme to support and provide routes for people who may be
fleeing conflict from a range of different countries. This includes, Afghan Resettlement Schemes, the
Homes for Ukraine Scheme which provides a range of routes for people fleeing the conflict in Ukraine and
the Asylum Dispersal Programme through which people seeking asylum are provided with accommodation
in specified nations. The main activities this year were, our third Military of Defence sub-let property in
Milton Bridge and two small hostels were transformed into large family accommodation in Dalkeith.  We
Page 81 of 258

Page 82

12
have worked with Social Work Children and Families to support with responsibilities around
Unaccompanied Asylum Seeking Children. 
As part of Midlothian Council’s Tenant Participation and Customer Engagement Strategy, Midlothian
undertakes annual surveys to determine the level of tenant satisfaction within Housing services provided
by the Council. Survey feedback was received this quarter with 81.5% of council tenants satisfied with
services overall during 2022. The next steps will include the delivery of focus groups to gather further
feedback on two key themes: 
• How tenants can work with the Council to assist in the improvement of the repair services, to
improve overall customer satisfaction levels.
• Further steps can be explored to improve customer satisfaction levels to ensure tenants feel more
informed about their services and also have the opportunity to participate in the future
development and delivery of these services.   
This quarter Council approved the repairs and maintenance service standards, this sets out the framework
in which our Building Maintenance service will deliver to ensure our Council houses are maintained to a
good standard expected by and agreed with our tenants, in line with the Council’s Tenancy Agreement. A
common repairs policy was also approved, which aims to ensure a clear and consistent approach to
recharging home owners for common repairs. A minimum let standard was introduced on a trial basis in
December 2022, using the let standard has reduced turnaround times for void properties.  In addition, this
quarter the Council approved a Dampness & Condensation Policy, the policy will introduce a uniform and
consistent approach to reports of condensation and dampness for our tenants, as well as optimising
investment, identifying and tacking issues to improve maintenance. 
Capital programme 
As Scotland’s fastest growing local authority area, it is critical to delivery that investment in community
infrastructure, such as housing, the learning estate, economic investment and green infrastructure, is in
the right place at the right time. This will help our communities to live well, live locally and prosper. 
How we invest in community infrastructure must also respond to changes in our working and living
patterns brought about by the pandemic. Communities need to be able to readily access the services they
require. Capital investment is also an opportunity to support our local economy through job creation and
skills enhancement, particularly in relation to supporting a transition to a green economy as we invest in
sustainable, highly energy efficient buildings. 
As a growing Council, we have the opportunity to transform parts of Midlothian in a way that reflects how
we live now. We will invest in community infrastructure with a focus on place-making, reducing
inequalities, improving economic opportunities and improving education and health and wellbeing
outcomes. 
The Capital Investment Strategy brings together many strands of the Council’s activities to build upon our
past successes and drive forward innovation in a co-ordinated and achievable manner for the benefit of
Midlothian and its citizens.
Page 82 of 258

Page 83

13 
The Capital Investment Strategy sits centrally within the Council’s future planning activities and in doing so
has to reflect the demands of Council services to ensure positive outcomes are achieved in the right place,
at the right time for the maximum benefit to Midlothian.  The extensive capital programme delivers new
schools, a record investment in council housing, improved community infrastructure, investment in the
local transport network and innovative developments such as the new low carbon heat network in
Shawfair. 
To ensure Midlothian is ‘building back better’, this investment is also creating new jobs, apprenticeship
opportunities, opportunities for businesses and communities and families hard-hit by the impact of
COVID-19. These new opportunities help lead the way out of the pandemic and towards a better future for
Midlothian. 
The Education Learning Estate Strategy programme has been developed and is subject to regular
review meetings with Education and stakeholders to ensure effective monitoring, reporting and
delivery of improvement and expansion of the Education estate including Early Years provision. This
currently covers approximately 30 projects at various stages of development. 
Midlothian Council is overseeing a significant housing programme. The total number of new homes
from phase 2, 3 and 4 is currently estimated at 1201, comprising of 489 from phase 2 budget and 712
from phase 3 and 4 budgets. Progress continues with 661 homes currently being constructed on site
either through commencement of enabling works or main contract works as of November 2022. This
includes the largest Passivhaus programme in Scotland, with 189 homes to be built to the exacting
Passivhaus standard, in line with Midlothian Council’s Net Zero Housing Design Guide. This ensures
exceptionally high levels of energy efficiency and low utility bills for our residents. 
Growing Council
In addition to the financial sustainability challenge referenced earlier, other challenges for Midlothian
continue with our recovery out of the pandemic, the cost of living crisis, the growing and ageing
population and the increasing demand for services that this brings. 
Midlothian is projected to have the highest percentage change in population size of all mainland council
areas in Scotland. From 2018 to 2028, the population of Midlothian is projected to increase from 91,340 to
103,945. This is an increase of 13.8%, which is in contrast to a projected increase of 1.8% for Scotland as a
whole, with a 40.9% increase in older people over 75. In addition, Midlothian has 10 zones which fall into
the most deprived areas giving a local share of 8.7% living in the most deprived areas in Scotland. 
This growth creates the opportunity to meet the housing need with 25% of new homes being built in the
affordable housing bracket, in addition to the expansion in Council house building. This construction will
directly support employment and will see a steady increase in the value of Council Tax income received
over time. 
The approved Capital Strategy sets out the infrastructure required to meet those demographic pressures
and includes the financial contributions Midlothian will make to the Edinburgh and South East Scotland
City Region Deal. Encompassing five main themes the City Region Deal will bring significant investment
across the regions with total investment of circa £1.3 billion across: 
Page 83 of 258

Page 84

14
• Date Driven Innovation: £751 million 
• Integrated Regional Employability and Skills: £25 million 
• Transport: £156 million 
• Culture: £45 million 
• Housing: £313 million 
Through the Data Driven Innovation strand the Deal will leverage existing world-class research institutes
and commercialisation facilities in order that Easter Bush becomes a global location of Agritech excellence.
The Easter Bush project includes significant investment in transport infrastructure along the A701/2
transport corridor. In addition, by improving on-site infrastructure at Easter Bush and transport
infrastructure, The University of Edinburgh expects commercial partners will be able to co-locate at scale
to commercialise Agritech breakthroughs. 
Challenges
Over recent years, innovative ways of working have been introduced and services adapted at pace to
respond to the needs of our citizens, in particular those experiencing the greatest levels of poverty and
inequality. This has resulted in transformation of how the Council works. Our services are continuing to
build on this learning moving forward, harnessing the energy, flexibility and creativity demonstrated by
our workforce, to embed a culture of continuous improvement and innovation across Place.
This year was challenging for Place services as it continues to support post-pandemic recovery, operate a
business as usual approach to service delivery and progress a range of transformation projects. 
Inflation as well as rising energy costs are affecting the construction industry in Scotland and the UK is
currently experiencing unprecedented adverse market conditions, leading to significant rises in tender
prices for a wide range of materials. There is evidence that inflation of between 10% and 15% beyond BCIS
predictions is affecting projects. Whilst measures such as value engineering are partially mitigating cost
increase there is a risk that the capital budgets will need to be increased with a resultant impact on the
funding strategy. The situation continues to be monitored however it has been necessary to review and
prioritise the existing capital plans and also review the 2022/23 service budgets to implement savings
measures in the year. 
Page 84 of 258

Page 85

15
Place PI summary 
01. Manage budget effectively 
Priorities Indicator
2021
/22
Q4
2021
/22
Q1
2022
/23
Q2
2022
/23
Q3
2022
/23
Q4
2022
/23
2022/23
Annual
Target
22/23
Feeder
Data Value
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Statu
s Note
Short
Tren
d
01. Manage
budget
effectively
Performance against
revenue budget
£37.
487
m
£37.
487
m
£38.
889
m
£39.
098
m
£40.
452
m
N/A N/A  22/23: Data not
available   
£38.06
7m     
02. Manage stress and absence 
Priorities Indicator
2021
/22
Q4
2021
/22
Q1
2022
/23
Q2
2022
/23
Q3
2022
/23
Q4
2022
/23
2022/23 Annual
Target
22/23
Feeder
Data Value
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Statu
s Note
Short
Tren
d
02. Manage
stress and
absence
Average number of
working days lost
due to sickness
absence
(cumulative)
11.0
3
11.0
3 3.04 5.50 9.13 13.3
8
13.3
8 
22/23: Data only 
The average
number of
working days lost
due to sickness
absence has
increased
compared to this
time last year.
While there is no
identifiable trends
either in short
term or long term
absences work
continues with
each service area
to review
attendance levels
and support those
staff who are
absent to be able
to return to work.    
Number of
days lost  
11,816
.16
Number of
FTE in
service  
883.43 
03. Process invoices efficiently 
Priorities Indicator
2021
/22
Q4
2021
/22
Q1
2022
/23
Q2
2022
/23
Q3
2022
/23
Q4
2022
/23
2022/23 Annual
Target
22/23
Feeder
Data Value
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Statu
s Note
Short
Tren
d
03. Process
invoices
efficiently
% of invoices paid
within 30 days of 89% 89% 91% 88% 84% 78% 78%  22/23: Off Target    90%
Number of
invoices
received  
23,795
Page 85 of 258

Page 86

16
invoice receipt
(cumulative)
Number of
invoices
paid within
30 days
(cumulative
)  
18,590 
04. Improve PI performance 
Priorities Indicator
2021
/22
Q4
2021
/22
Q1
2022
/23
Q2
2022
/23
Q3
2022
/23
Q4
2022
/23
2022/23 Annual
Target
22/23
Feeder
Data Value
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Statu
s Note
Short
Tren
d
04. Improve
PI
performance
% of Service PIs that
are on target/ have
reached their target. 
(does not include
Corporate PIs)
75.5
1%
75.5
1%
72.9
7%
73.8
1%
74.4
2%
74.4
2%
74.4
2% 
22/23: Off Target 
There are 8
performance
indicators off
target mainly
across the
housing, building
services and
neighbourhood
services areas.
There are 2
indicators that
have no data
available yet.
More detailed
information on
these are set out
in the indicator
commentary note.   
90%
Number on
tgt/complet
e or Data
Only  
32
Total
number of
PI's  
43 
05. Control Risk 
Priorities Indicator
2021
/22
Q4
2021
/22
Q1
2022
/23
Q2
2022
/23
Q3
2022
/23
Q4
2022
/23
2022/23 Annual
Target
22/23
Feeder
Data Value
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Statu
s Note
Short
Tren
d
05. Control
Risk
% of high risks that
have been reviewed
in the last quarter
100
%
100
%
100
%
100
%
100
%
100
%
100
% 
22/23: All risks
reviewed.    100%
Number of
high risks
reviewed in
the last
quarter  
3
Number of
high risks   3 
06. Implement Improvement Plans 
Priorities Indicator
2021
/22
Q4
2021
/22
Q1
2022
/23
Q2
2022
/23
Q3
2022
/23
Q4
2022
/23
2022/23 Annual
Target
22/23
Feeder
Data Value
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Valu
e
Statu
s Note
Short
Tren
d
Page 86 of 258

Page 87

17
06.
Implement
Improvement
Plans
% of internal/external
audit actions
progressing on
target or complete
this quarter. 
100
%
100
%
100
%
90.7
%
100
%
100
%  
22/23: On Target 
All audit actions
reviewed this
quarter. 
90%
Number of
internal/ext
ernal audit
actions on
target or
complete  
51
Number of
internal/ext
ernal audit
actions  
51 
Page 87 of 258

Page 88

18
Place Complaints Indicator Summary 
Commitment to valuing Complaints
4. Outcomes and Customer Feedback 
Indicator
2021/
22
Q4
2021/
22
Q1
2022/
23
Q2
2022/
23
Q3
2022/
23
Q4
2022/
23
2022/23 Annua
l
Target
2022/
23 Value Value Value Value Value Value Value Status Note Short
Trend
Number of complaints received (quarterly) 6,064 1,216 1,750 1,552 1,368 1,377 6,047  22/23: Data only    
Number of complaints closed in the year 5,922 1,147 1,658 1,253 1,096 1,055 5,062  22/23: Data only    
Number of complaints upheld (quarterly) 4,685 811 878 883 904 819 3,484  22/23: Data only    
Number of complaints partially upheld
(quarterly) 168 109 124 92 174 227 617  22/23: Data only    
Number of complaints not upheld
(quarterly) 128 19 12 21 6 4 43  22/23: Data only    
Number of complaints Resolved
(quarterly) 936 206 632 14 12 5 663  22/23: Data only    
Average time in working days to respond
to complaints at stage 1 3.14 2.48 2.47 2.41 1.97 1.42 2.13  22/23: On Target    5
Average time in working days to respond
to complaints at stage 2 28 13 0 19.5 0 0 19.5  22/23: On Target    20
Average time in working days for a full
response for escalated complaints 33.5 48.33 35 6.5 20 0 17  22/23: On Target    20
Percentage of complaints at stage 1
complete within 5 working days 87.9% 92.83
%
87.87
%
88.95
%
92.88
%
96.87
% 91.1% 
22/23: Off Target 
This year, the majority
of complaints
responded to outwith
the 5 day target were
in relation to Waste
services. Given the
high volume of
complaints for this
service average
response times still
remain low. For
quarter 4 the
percentage of
complaints dealt with
within 5 working days
was 96.87% meeting
target.   
95%
Percentage of complaints at stage 2
complete within 20 working days 62.5% 100% 100% 50% 100% 100% 50% 
22/23: Off Target 
2 complaints for stage
2 received this year. 1
of which was
responded to outwith
20 working days.   
95%
Percentage of complaints escalated and
complete within 20 working days
33.33
% 0% 0% 100% 100% 100% 75% 
22/23: Off Target 
4 escalated
complaints this year. 1
of which was not
responded to within 20
working days.   
95%
Page 88 of 258

Page 89

19
Number of complaints where an extension
to the 5 or 20 day target has been
authorised (quarterly) 
0  1 0 0 1  22/23: Data only    
Number of Compliments  99 15 25 44 34 42 146  22/23: Data only    
Page 89 of 258

Page 90

20
Place Performance 
Page 90 of 258

Page 91

21
Building Services priorities 
• Continue to deliver the Building Standards continuous improvement plan which forms part of the nationally adopted performance framework and is submitted to the
Scottish Government. 
• Continue to deliver the additional programmes of work identified by the house condition surveys to maintain the Scottish Housing Quality Standard (SHQS) for the
Council's housing stock. 
• Deliver the Energy Efficiency Standard for Social Housing (EESSH) programme. 
• Continue to improve the delivery of Building Maintenance Services through the review of mobile working, process improvements, income and productivity. 
• Implementation of the Local Authority Carbon Management Plan and General Services Capital programme   
Building Services measures
PI Code PI 2021/22 Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
2022/23 Annual
Target
2022/23 Value Value Value Value Value Value Value Status Short
Trend
Note
BS.PLACE.P.5.
2b
Percentage of the Council's
housing stock meeting the
'Modern facilities & services'
Scottish Housing Quality
Standard criteria
98.4% 98.4% 98.4% 98.4% 98.4% 98.4% 98.4%   22/23: Off Target 
Work planned to bring the
percentage of Council's
housing stock that does not
meets Scottish Quality
Standards criteria back to
standard. Access to properties
has been an issue this year.  
100%
HSN3 Corporate Indicator -
Percentage of the Council's
housing stock meeting the
Scottish Housing Quality
Standard criteria   (LGBF)
77.55% 34.3% 34.3% 34.3% 34.3% 32.28% 32.28%   22/23: Off Target 
Due to changes in the Energy
Efficiency regulations affecting
the Scottish Housing Quality
Standards (SHQS) criteria, 431
houses have been identified as
failing the Energy Efficiency
Standard for Social Housing
(ESSH). We have reduced
these failures to 160 to meet
the 2025 targets. However, with
100%
Page 91 of 258

Page 92

22
PI Code PI 2021/22 Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
2022/23 Annual
Target
2022/23 Value Value Value Value Value Value Value Status Short
Trend
Note
the Electrical Installation
Condition Reports (EICR’s)
now part of the SHQS from the
31st March 2022 we have
found that 4923 fail assessment
and have 32.28% meeting
standard. Tender currently out
to address the shortfall of
EICR’s Required. 100% of
smoke alarms comply with
current legislation. Contracts
are in process to address the
EICRs and 160 properties for
EESSH failure.  
HSN4b Average time taken to complete
non-emergency repairs 
(LGBF)
9.36 days 14.49
days
13.71
days
18.65
days
17.52
days
19.45
days
17.33
days  
22/23: Off Target 
The yearly average taken
across all quarters is 17.33
days to complete non-
emergency repairs. Q4 saw an
increase to 19.45 days from
previous quarters due to a
number of historic jobs where
work had been completed but
dates were not recorded in the
system. As Building
Maintenance Service are
undergoing a whole systems
service transformation the work
streams included for job
performance and reporting will
be addressed within the
programme improvements.  
7.00 days
PLACE.P.10.2
a
Percentage of Building warrant
assessments processed within
10 days (rather than nationally
adopted target of 20 days), fast
tracking applications which
100% 100% 75% 100% 71.43% 100% 100%   22/23: On Target 
Service provision in the form of
site inspections and building
warrant application processing
remains high.  
80%
Page 92 of 258

Page 93

23
PI Code PI 2021/22 Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
2022/23 Annual
Target
2022/23 Value Value Value Value Value Value Value Status Short
Trend
Note
provide economic benefit to the
Midlothian area or people living
with disabilities circumstances. 
PLACE.P.17.8
a
Measure satisfaction relating to
key areas in Building standards
including those on delivery,
timeliness, information, access
and the quality of customer
service
96% 96% 94% 96.2% 96.4% 96.4% 96.4%   22/23: On Target    90%
PLACE.P.5.2a Percentage of the Council's
housing stock meeting the
'Free from serious disrepair'
Scottish Housing Quality
Standard criteria
98.9% 98.9% 98.9% 98.9% 98.9% 98.9% 98.9%   22/23: Off Target 
98.9% of Midlothian Council
houses have modern facilities
and services which is
consistent with last year's
figure. Contracts are ongoing
this quarter to bring the
percentage of Council's
housing stock that does not
meet SHQS criteria back to
target.  
100%
PLACE.P.5.2c Percentage of the Council's
housing stock meeting the
'Healthy, safe & secure'
Scottish Housing Quality
Standard criteria
34.3% 34.3% 34.3% 34.3% 34.3% 32.28% 32.28%   22/23: Off Target 
Due to changes in the Energy
Efficiency regulations affecting
the Scottish Housing Quality
Standards (SHQS) criteria, 431
houses have been identified as
failing the Energy Efficiency
Standard for Social Housing
(ESSH). We have reduced
these failures to 160 to meet
the 2025 targets. However, with
the Electrical Installation
Condition Reports (EICR’s)
now part of the SHQS from the
31st March 2022 we have
100%
Page 93 of 258

Page 94

24
PI Code PI 2021/22 Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
2022/23 Annual
Target
2022/23 Value Value Value Value Value Value Value Status Short
Trend
Note
found that 4923 fail assessment
and have 32.28% meeting
standard. Tender currently out
to address the shortfall of
EICR’s Required. 100% of
smoke alarms comply with
current legislation. Contracts
are in process to address the
EICRs and 160 properties for
EESSH failure.  
PLACE.P.5.2d Percentage of completed first
priority housing repairs within
target of 24 hrs
90.67% 93.92% 93.51% 91.6% 94.26% 93.87% 93.31%   22/23: Data only 
93.31% average across 22/23.
Q4: 93.87%.   
PLACE.P.5.2e Percentage of completed
second priority housing repairs 
within target of 7 days
88.16% 88.34% 85.96% 87.13% 93.87% 92.99% 89.98%   22/23: Data only 
89.98% average for 22/23. Q4:
92.99%.   
Property and Facilities Management priorities
• Develop carbon reduction targets for Council properties and work with energy partners to develop energy efficiency projects, including renewable energy, in support of
sustainable low carbon energy targets and district heating schemes. 
• Support the delivery of the Economic Renewal Strategy through the letting and sale of Property Investment Account properties. 
• Lead the acquisition and disposal of identified sites in support of Capital and Local Plans, Learning Estate and Housing programmes and the climate change agenda. 
• Continue to deliver Building Rationalisation and hybrid working. 
• Maintain compliance and review Health and Nutrition of school meals in accordance with new Scottish Government legislation and continue the assessment of food
commodities/products for school meal menus in relation to proposed changes in nutritional regulation. 
• Increase revenue throughout the commercial sector of catering services. 
• Continue to provide a catering and facilities service that reacts to, and meets the requirements of, the Early Years expansion programme 
• Continue to improve the facilities and cleaning services and introduce new cleaning practices and methodologies.   
Page 94 of 258

Page 95

25 
Property and Facilities Management measures 
PI Code PI 2021/22 Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
2022/23 Annual
Target
2022/23 Value Value Value Value Value Value Value Status Short
Trend
Note
PLACE 1.1a Number of school meals
provided in primary Schools
(quarterly)
68,768 59,192 40,626 7,581 30,423 71,429 150,059   22/23: Data only 
71,429 paid meals served with
69 days in this quarter, 4 of
these were industrial action
days. 150,059 paid meals
served in the year.   
PLACE 1.1b Number of school meals
provided in Secondary Schools
(quarterly)
32,497 26,549 23,428 21,012 55,458 58,219 158,117   22/23: Data only 
158,117 Secondary meals
served this year.   
PLACE 1.1c Number of Free school meals
provided (Primary) (quarterly)
419,365 173,042 116,176 93,321 182,250 185,883 577,630   22/23: Data only 
185,883 meals served with 69
days in this quarter, 4 of these
were industrial action days.
577,630 free P1-P5 meals
served in the year.   
PLACE 17.1a Total hours used for cleaning in
primary schools (quarterly)
102,265 36,725 24,860 12,430 29,380 48,731.2
5
115,401.
25  
22/23: Data only 
Q4 figure shows 48,371.25
hours used, with 69 days in this
quarter. Enhanced cleaning
and additional Janitorial
services remain in place.
Sanitising/fogging of
classrooms and schools
continues to be carried out, this
comes to an end in April 2023.
Budgeted weekly hours are
2,105. However we currently
use 2,825 hours per week.   
PLACE 17.1b Total hours used for cleaning in
secondary schools (quarterly)
59,078.4 21,216 14,388 7,180.8 16,972.8 22,521.6 61,063.2   22/23: Data only 
Q4 figure shows 22,521.6
hours used, with 69 days in this
quarter. Enhanced cleaning
and additional Janitorial 
Page 95 of 258

Page 96

26
PI Code PI 2021/22 Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
2022/23 Annual
Target
2022/23 Value Value Value Value Value Value Value Status Short
Trend
Note
services remain in place.
Sanitising/fogging of
classrooms and schools
continues to be carried out.
This comes to an end in April
2023. Budgeted weekly hours
are 1.392. However, 1,632
hours are used per week.  
PLACE 17.1c Total hours used for Janitorial
services in schools (quarterly)
51,784.1 18,596.5 12,588.4 6,294.2 14,877.2 19,740.9 53,500.7   22/23: Data only  
Q4 figure shows 19,740.9
hours used, with 69 days in this
quarter. Enhanced cleaning
and additional Janitorial
services remain in place.
Sanitising/fogging of
classrooms and schools
continues to be carried out, this
comes to an end in April 2023.
Budgeted weekly hours are
1,140. However, 1,430.5 hours
are used per week.   
Page 96 of 258

Page 97

27
Housing priorities 
• Continue to develop the Rapid Rehousing Transition Plan to increase the number of homeless households that obtain permanent accommodation, and halve the
average time taken for the Council to complete its homeless duty from 105 weeks to 52 weeks 
• Develop the Local Housing Strategy 2021/26, the Strategic Housing Investment Plan 2021/22, a Homeless Prevention Strategy and Action Plan and a Tenant
Participation Strategy. 
• Increase the supply of new build affordable housing (including open market purchases) in Midlothian with the new build programme set out in the Strategic Housing
Investment Plan 2019/20 – 2023/24. 
• Implement Midlothian Council’s Allocation Policy 
• Implement the approach to housing those with complex needs through a ‘Housing First’ model 
• Promote the reuse of suitable vacant or vacated council buildings to provide a more supportive and productive environment to homeless households and achieve
cost efficiencies 
• Continue to drive forward transformation through the adoption of digital platforms, review of void management to minimise re-let timescales and further development
of our tenancy support to improve the sustainability of tenancies 
• Introduce a new strategy to reduce drug deaths within Midlothian homelessness accommodation 
• Invest in our workforce through the ongoing development of cross team working to upskill and capacity build and the continued rollout of the Housing Options toolkit
and trauma training  
Housing measures
PI Code PI 2021/22 Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
2022/23 Annual
Target
2022/23 Value Value Value Value Value Value Value Status Short
Trend
Note
BS.PLACE.P.1
7.1
Length of time (weeks)
homeless applicants wait until
receiving a permanent housing
outcome
85 85 106 121 76 70 70   22/23: On Target 
The team continues to focus on
targeting long term cases
where permanent housing
options are more challenging
due to specific housing needs.  
85
BS.PLACE.P.4.
2a
Re-let time permanent
accommodation properties
(calendar days)
46 days 39 days 45 days 36 days 25 days 24 days 33 days   22/23: On Target 
Re-let times for permanent
properties has reduced from 45
days in Q1 to 24 in Q4.  
35 days
Page 97 of 258

Page 98

28
PI Code PI 2021/22 Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
2022/23 Annual
Target
2022/23 Value Value Value Value Value Value Value Status Short
Trend
Note
PLACE.P.17.2 Length of time (weeks)
homeless applicants spend in
temporary accommodation
70 70 88 86 89 62 62   22/23: Off Target 
Although slightly off target, A
continued downward trend in
time spent in temporary
accommodation with a
reduction from Q1 this year to
Q4.  
60
PLACE.P.19.1 Total applicants on waiting lists
(General Needs & Homeless)
N/A N/A 4,523 4,596 4,628 4,612 4,612   22/23: Data only 
4,007 General Needs
applicants and 605 Homeless
applicants.   
PLACE.P.19.2 Total number of lets N/A N/A 96 112 114 149 475   22/23: Data only 
The cumulative total is 475 lets,
of which 184 were made to
General Need's applicants and
291 to Homeless applicants.   
PLACE.P.19.3 Number of clients accessing
homelessness advice &
assistance
N/A N/A 232 211 226 309 978   22/23: Data only   
PLACE.P.19.4 Number of clients prevented
from homelessness by advice
& assistance
N/A N/A 89 82 90 123 384   22/23: Data only   
PLACE.P.4.2b Re-let time temporary
accommodation properties
(calendar days)
37 41 34 25 31 42 41   22/23: Off Target 
Average taken across all
quarters is 41 days. Q4 figure
42 days, a small number of
properties held up due to
utilities, scale of repair works
required and some delays with
the furnishing contractor, this
has resulted in an increase in
Q3 and Q4.  
28 
Page 98 of 258

Page 99

29
Neighbourhood Services priorities 
• Continue to progress the capital programme for carriageway and footway renewal and improvement schemes. 
• Implement new requirements as contained in the new Transport (Scotland) Act 2019 
• Improve and expand active travel and public transport for Midlothian residents 
• Further reduce the Council’s energy consumption by increasing the use of LED street lighting 
• Transform service delivery through the adoption of digital and mobile platforms 
• Contribute to the development of the National Transport Strategy 
• Continue with preparations for the publication of the second Flood Risk Management Plan 
• Manage the parking enforcement contract and parking restrictions/charges to maximise access and safety and produce efficiencies 
• Support the delivery of the Climate Change strategy and explore options for additional funding for Electric Vehicles and Electric Vehicle Charging Infrastructure 
• Promote the use of environmentally friendly, low- emission vehicles. 
• Continue to progress actions to reach the Scottish government targets to recycle 70% of all waste by 2025 
• Ensure waste disposal contracts priorities maximum recycling, that waste services consider the climate impact of the service, seeking opportunities to limit the
climate impact of the services approach to service delivery. 
• Reduce customer complaints for waste services 
• Seek new income streams for Vogrie Country Park and develop the Park as a tourist destination to support local businesses. 
• Continue to design and implement re-design of outdoor facilities through landscape design as part of Early Years Settings expansion programme. 
• Develop a comprehensive asset database management plan and for all Neighbourhood Services assets 
• Maintain meadowland areas to create greater diversity and continue to develop areas of bio-diversity and foster community support. 
• Deliver an allotments and food growing strategy to comply with the Community Empowerment (Scotland) Act 2015 and review implications for Core Paths plan in
line with the Land Reform (Scotland) Act 2016 
• Deliver the Open Space strategy 
• Continue to target key locations within Midlothian for landscape improvements by the design of new parks and other open space sports facilities and play areas,
subject to available funding, with an emphasis on inclusive play equipment. 
• Continue to invest in the workforce across all Neighbourhood Services teams to develop sustainable career pathways and generic working models to grow talent
and foster leadership opportunities       
Page 99 of 258

Page 100

30
Neighbourhood Services measures 
PI Code PI 2021/22 Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
2022/23 Annual
Target
2022/23 Value Value Value Value Value Value Value Status Short
Trend
Note
BS.PLACE.01 Number of environmental
awards e.g. Green flags
1 1 0 2 2 2 2   22/23: Complete 
Green flags secured for Vogrie
Country Park and Memorial
Park Loanhead.  
2
BS.PLACE.P.1
5.1c
Percentage of all street light
repairs completed within 7 days
(cumulative)
100% 100% 100% 93% 99.7% 95.25% 98.74%   22/23: On Target   90%
BS.PLACE.P.1
5.3a
Percentage of Council fleet
which is 'Green' (cumulative)
8.2% 8.2% 8.2% 8.2% 8.2% 8.2% 8.2%   22/23: On Target   8%
BS.PLACE.P.1
5.6a
Percentage of waste going to
landfill per calendar year
(quarterly)
12.3% 12.3% 10.4% 12.1% 12.2% N/A N/A   22/23: Data not available until
Q1. 
Landfill waste is rejected
material from dry mixed
recycling and food waste plus
ash from incineration of
residual waste. No
waste/recycling is sent to
landfill without pre-treatment.  
15.0%
PLACE.P.14.2f % of the footpath network
resurfaced (cumulative)
0.54% 0.54% 0.12% 0.27% 0.43% 1.02% 1.02%   22/23: On Target 
7.26km of footways resurfaced
to end Q4, under combined
programmes of annual Capital
Works and Residential Streets.  
0.6%
PLACE.P.15.1
a
Total savings in street lighting
carbon emissions (cumulative)
1256
Tonnes
1256
Tonnes
183
Tonnes
394
Tonnes
751
Tonnes
1075
Tonnes
1075
Tonnes  
22/23: Data only 
Reduced Carbon saving
caused by Emission factor
being reduced per KWH.   
ENV6 Percentage of total household
waste that is recycled  (LGBF)
47.5% 47.5% 51.9% 48.2% 43.7% N/A N/A   22/23: Data not available until
Q1 
2022 Recycling rate expected
to be 47.4%. Last quarters
recycling rate was 47.5%.  
54.0%
PLACE.P.13.1
a
Number of volunteer hours in
countryside sites
4,821 4,821 1,716 2,736 4,212 5,604 5,604   22/23: Off Target 
Although off target, groups and
events have increased from last
year and considerably higher
6,000
Page 100 of 258

Page 101

31
PI Code PI 2021/22 Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
2022/23 Annual
Target
2022/23 Value Value Value Value Value Value Value Status Short
Trend
Note
from 20/21 as we start to build
back our volunteer numbers to
pre-covid figures. It should be
noted that the secondment of
one of our three Rangers has
impacted our overall target for
the year. 5,604 volunteer hours
have been spent in countryside
sites this year ensuring those
sites are attractive, safe and
welcoming for all to enjoy.  
PLACE.P.14.2
e
% of total road network
resurfaced (cumulative)
2.05% 2.05% 0.34% 1.38% 2.2% 2.89% 2.89%   22/23: On Target 
20.10km of carriageway
resurfaced to the end of Q4
under the combined
programmes of annual Capital
Works and Residential Streets
Programmes.  
2.2%
PLACE.P.15.1
b
Number of lighting columns
replaced (cumulative)
702 702 0 0 5 136 136   22/23: Off Target 
Successful procurement of new
contracts for both lighting
capital and traffic signal
maintenance will deliver best
value for the service. Due to
late procurement of these
contract this year, funding has
been diverted to the delivery of
1,796 new LED lanterns,
anticipated to be complete in
May. As a result, 136 lighting
column replacements were
installed this quarter with a
further 403 units expected to be
complete in July.  
131
Page 101 of 258

Page 102

32
PI Code PI 2021/22 Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
2022/23 Annual
Target
2022/23 Value Value Value Value Value Value Value Status Short
Trend
Note
PLACE.P.20.1 Percentage of household waste
used to generate heat and
electric (Energy from Waste)
N/A 41.5% 35.7% 38.6% 39.2% N/A N/A   22/23: Data not available until
Q1. 
Incineration waste includes
grey bin (black bag) waste, plus
fine and non-recyclable waste
collected in the bulky waste at
the two HW recycling centres,
as well as non-target materials
placed in the blue recycling
bins.   
Planning and Economy priorities 
• Continue to work on achieving the aims sets out in the Planning Performance Framework (PPF) 
• Continue to embed the Climate Change Strategy and deliver against the action plan 
• Determine 80% of planning applications within target (2 months for a local application and 4 months for a major application) 
• Implementation of year 3 of a 5 year Penicuik Heritage project which delivers public realm improvements and investment in heritage assets in the town centre 
• Draft and adopt supplementary guidance on the ‘Quality of Place’ which will be used as a tool to enhance place-making within Midlothian 
• Draft and adopt supplementary guidance on ‘Developer Contributions’ which will be used as a tool to secure financial contributions towards infrastructure to meet
the demands arising from new development. 
• Implementing the statutory requirements of the new Planning Act 2019 which places additional burdens onto the Planning Service 
• Deliver on the objectives identified in the Strategy for Growth 2020-25 
• Maintain and grow the client reach of Business Gateway services in Midlothian and continue to develop Locate in Midlothian 
• Complete allocation and drawdown of final LEADER funding to eligible projects and lobby for continuum funding for Midlothian’s rural areas 
• Complete drawdown of Town Centre Capital Funds to applicants and continue to position the government for future funding opportunities and retain a focus on town
centres as identified by the Strategy for Growth 2020-25, to commence the Townscape heritage (TH) and Conservation Area Regeneration Scheme (CARS) at
Penicuik, and implement the provisions of the master plan at Newtongrange. 
• Continue to work with partners to tackle the strategic local transport issues at Easter Bush to enable further unconstrained planned development  
Page 102 of 258

Page 103

33
Planning and Economy measures 
PI Code PI 2021/22 Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
2022/23 Annual
Target
2022/23 Value Value Value Value Value Value Value Status Short
Trend
Note
ECON5a Number of New Business Start
Ups (LGBF)
124 38 23 6 26 63 118   22/23: Data only 
The level of Business start-ups
has increased from 6 in Q2 to
63 in Q4, most of these had
accessed pre-start support in
2021/22 and some from earlier
this financial year. 
The total number Business
start-ups this year was 118.
This should realise a forecasted
creation of 142 jobs, with
quarter 4 jobs forecasted to be
74.   
PLACE.P.17.9
a
Determine 80% of planning
applications within target (2
months for a local application
and 4 months for a major
application).
80% 80% 66% 80% 85% 85% 85%   22/23: On Target 
85% of planning applications
have been determined within
target (*as of February 2023 –
data not yet available for March
2023).  
80%               
Page 103 of 258

Page 104

34
Protective Services priorities 
• Continue to support the Council’s response to the pandemic and recovery programme 
• Continue to deliver the Council's regulatory functions with respect to food hygiene and standards regulations. 
• Deliver the Scottish Government's Clean Air for Scotland (CAFS) objectives including the review and assessment of air quality in Midlothian to take into account of
exposure in proximity to schools located near busy roads. 
• Continue to deliver the statutory duty to identify and secure remediation of contaminated and review contaminated land strategy. 
• Continue to manage the CO2 gas ingress to properties in Gorebridge. 
• Seek to enable disabled persons to continue to live an independent life through the provision of disabled adaptation grants for private sector properties. 
• Protect and develop safe communities through risk assessment and improvement of sub-standard private water supplies. 
• Protect and contribute to the enhancement of the environment regarding dog control activities and develop a commercial dog walkers registration scheme for
Midlothian. 
• Regulate Health and Safety across Midlothian through the investigation of workplace accidents 
• Restart a programme of test purchase for under-age goods 
• Continue to identify and respond to incidents of rogue trading. 
• Conduct a programme of inspections to businesses identified as of high and medium-risk including at least 20% of tobacco retailers. 
• Continue to support managers to manage health and safety as effectively and efficiently as possible 
• Ensure that the current management arrangements achieve the correct level of Health and Safety compliance and support services to address any shortfalls 
• Continue to develop the health and safety culture maturity within the organisation and promote the use of the Health and Safety Audits 
• Increase appropriate involvement and expertise in emergency planning and business continuity management Council wide 
• Implement a robust business continuity management system and business continuity approach  
Protective Services measures 
PI Code PI 2021/22 Q1 2022/23 Q2 2022/23 Q3 2022/23 Q4 2022/23 2022/23
Value Value Value Value Value Value Status Short Trend Note
PROSERVICE
S.1.1
Number of food law service
requests/complaints received
(includes food safety and food
standards)
N/A 146 116 88 95 445   22/23: Data only  
PROSERVICE
S.1.2
Number of food law service
requests/complaints responded
to (includes food safety and
food standards)
N/A 142 110 88 94 434   22/23: Data only  
PROSERVICE
S.1.3
Number of Food law
interventions carried out (Food
Hygiene/Food Standards)
N/A 72 59 107 117 355   22/23: Data only  
Page 104 of 258

Page 105

35
PI Code PI 2021/22 Q1 2022/23 Q2 2022/23 Q3 2022/23 Q4 2022/23 2022/23
Value Value Value Value Value Value Status Short Trend Note
PROSERVICE
S.1.13
Number of Public Health
Complaints received
N/A N/A N/A 273 300 1,304   22/23: Data only  
1304 complaints received across the
year.  
PROSERVICE
S.1.14
Number of Public Health
complaints responded to
N/A N/A N/A 243 280 N/A   22/23: Annual data not available 
New indicator was added to the Place
Service plan mid-year. Although we
can report on the total number of
public health complaints received for
the year, we are unable to report on
the total number responded to for the
first part of year. Reporting will be
reviewed in Q1.  
PROSERVICE
S.2.1
Number of consumer
complaints received
N/A 72 82 75 58 287   22/23: Data only  
PROSERVICE
S.2.2
Number of consumer
complaints responded to
N/A 72 82 75 58 287   22/23: Data only 
100% of consumer complaints
responded to this year.   
Page 105 of 258

Page 106

36
Place External Audit Actions 
External Audit - Annual Audit Report to Members and the Controller of Audit - year ended 31 March 2022 
Code Action Due Date Icon Progress Comment & Planned Improvement Action
EA.2022.01
The valuation methodology adopted by the Council’s internal
valuers should be subject to review to ensure it remains in line
with best practice. This should include a review of the quality
review arrangements in place to reduce errors in valuations.
31-May-2023  50%
Q4 22/23: In progress 
Policies and procedures will be reviewed following new External
Audit appointment.  
EA.2022.08
The Council must review whether current actions are sufficient
to meet its 2030 target. This should include an assessment of
the level of future investment required.
31-May-2023  80%
Q4 22/23: In progress 
This action will be progressed when the Council’s adopted
Climate Change Strategy is reviewed in 2023.   
Page 106 of 258

Page 107

37
Place Balanced Scorecard Indicators 
PI Code Performance Indicator
2021/22 Q1
2022/23
Q2
2022/23
Q3
2022/23 2022/23 Annual
Target
2022/23 Value Value Value Value Value Status Short
Trend Note
BS.PLACE.01 Number of environmental awards e.g. Green flags 1 0 2 2 2  
22/23: Complete 
Green flags secured for
Vogrie Country Park and
Memorial Park Loanhead.  
2
BS.PLACE.P.15.1c Percentage of all street light repairs completed within 7 days
(cumulative) 100% 100% 93% 99.7% 98.74%   22/23: On Target   90%
BS.PLACE.P.15.3a Percentage of Council fleet which is 'Green' (cumulative) 8.2% 8.2% 8.2% 8.2% 8.2%   22/23: On Target   8%
BS.PLACE.P.15.6a Percentage of waste going to landfill per calendar year
(quarterly) 12.3% 10.4% 12.1% 12.2% N/A  
22/23: Data not available
until Q1. 
Landfill waste is rejected
material from dry mixed
recycling and food waste
plus ash from incineration
of residual waste. No
waste/recycling is sent to
landfill without pre-
treatment.  
15.0%
BS.PLACE.P.4.2a Re-let time permanent accommodation properties (calendar
days) 46 days 45 days 36 days 25 days 33 days  
22/23: On Target 
Re-let times for permanent
properties has reduced
from 45 days in Q1 to 24 in
Q4.  
35 days 
Page 107 of 258

Page 108

Page 108 of 258

Page 109

Item 5.5
Page 109 of 258

Page 110

Building Services
Continue to deliver the Building Standards continuous improvement plan which forms part of the nationally adopted performance
framework and is submitted to the Scottish Government.
Continue to deliver the additional programmes of work identified by the house condition surveys to maintain Scottish Housing
Quality Standard for the Councils housing stock.
Deliver the Energy Efficiency Standard for Social Housing (EESSH) programme.
Continue to improve the delivery of Building Maintenance services through the review of mobile working, process improvements,
income and productivity.
Implementation of the Local Authority Carbon Management Plan and General Services Capital programme.
Key highlights
Building Standards continues to provide a high level of customer satisfaction against an increasing demand by co-ordinating working arrangements with partners, monitoring
performance, identifying any dips, publishing information on this together with any remedial action, identifying customer needs and ensuring appropriate resources are available
to meet those needs. In December, 2022 the Building Standards service was awarded its full re-appointment period by the Scottish Government. This re-appointment period is
from 1 May 2023 until 30 April 2029.
In relation to our ambitious affordable housing programme, Phase 1, now complete, provided 864 additional houses within Midlothian. The total number of new homes from
phase 2, 3 and 4 is currently estimated at 1201, comprising of 489 from phase 2 budget and 712 from phase 3 and 4 budgets. Progress continues with 661 homes currently being
constructed on site either through commencement of enabling works or main contract works as of November 2022. This includes the largest Passivhaus programme in Scotland,
with 189 homes to be built to the exacting Passivhaus standard, in line with Midlothian Council’s Net Zero Housing Design Guide. This ensures exceptionally high levels of energy
efficiency and low utility bills for our residents.
Grant Funding of £696,497 for 2022/23 Energy Efficiency was awarded this year and contracts have been awarded for the extension of the Cameron Crescent and Ladywood areas
of Midlothian. Two contracts for a combined total of £1.6m for roughcasting of social housing have been awarded and are ongoing in the Dalkeith and Newtongrange areas.
This quarter Council approved the repairs and maintenance service standards, this sets out the framework in which our Building Maintenance Service will deliver to ensure our
Council houses are maintained to a good standard expected by and agreed with our tenants, in line with the Council’s Tenancy Agreement. A common repairs policy was also
approved, which aims to ensure a clear and consistent approach to recharging home owners for common repairs. A minimum let standard was introduced on a trial basis in
December 2022, using the let standard has reduced turnaround times for void properties.
Areas of improvement: Due to changes in the Energy Efficiency regulations affecting the Scottish Housing Quality Standards (SHQS) criteria, 431 houses have been identified as
failing the Energy Efficiency Standard for Social Housing (EESSH). We have reduced these failures to 160 to meet the 2025 targets. However, with the Electrical Installation
Condition Reports (EICR’s) now part of the SHQS from the 31st March 2022 we have found that 4733 fail assessment and have 32.28% meeting standard. It should be noted that
100% of smoke alarms comply with current legislation. Contracts are in process to address the EICRs and 160 properties for EESSH failure. 
Holistic
Modern
Sustainable
Preventative
93.92%93.51%
91.60%
94.3% 93.87%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
% of completed first priority
repairs within target of 24hrs
96% 94% 96.2% 96.4% 96.4%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Satisfaction % relating to key areas
in Building standards including
those on delivery, timeliness,
information, access and the quality
of customer service
Target (90%)
98.9% 98.9% 98.9% 98.9% 98.9%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
% of the Councils housing stock
meeting the 'Free from serious
disrepair' Scottish Housing
Quality Standard criteria
Target (100%)
88.34%
85.96%87.13%
93.87% 92.99%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
% of completed second
priority repairs within target of
7 days
Page 110 of 258

Page 111

Property and Facilities
Management
Develop carbon reduction targets for Council properties and support of sustainable low carbon energy targets and district heating
schemes.
Support the delivery of the Economic Renewal Strategy through the letting and sale of Property Investment Account properties.
Lead the acquisition and disposal of identified sites in Capital and Local Plans, Learning Estate and Housing programmes and the climate
change agenda.
Continue to deliver Building Rationalisation and hybrid working.
Maintain compliance and review Health and Nutrition of school meals in accordance with new Scottish Government legislation. 
Increase revenue throughput the commercial sector of catering services.
Continue to provide a catering and facilities service that reacts to, and meets the requirements of the Early Years expansion programme.
Continue to improve the facilities and cleaning services by introducing new cleaning practices and methodologies.
Asset based
36,725
24,860
12,430
29,380
48,731
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Total hours used for cleaning
in primary schools
21,216
14,388
7,180
16,972
22,521
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Total hours used for cleaning
in secondary schools
18,596
12,588
6,294
14,877
19,740
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Total hours used for Janitorial
services in schools
Key highlights
The Local Heat and Energy Efficiency Strategies (LHEES) aims to establish local authority plans for improving the energy efficiency of buildings and decarbonising heat.
LHEES is currently being piloted under the Energy Efficiency Scotland Programme. In conjunction with consultants, Midlothian are now at Stage 4 of the methodology
and are currently reviewing the findings and in discussion with key stakeholders regarding the confirmation of data, and identification, review and potential priorities.
Work continues with Midlothian Energy to develop business case options for addressing building fabric and energy decarbonisation of the existing estate. The planned
site has been secured for the new Midlothian Energy Centre at Millerhill, as a key step in the delivery of District Heating at Shawfair.  The energy services agreement
with Shawfair LLP received shareholders consent in December, 2022 allowing closure of the deal to supply and manage heat distribution for Shawfair. The conclusions
of the heat offtake agreement at Millerhill waste and recycling plant allowed the signing of the design and build and operating and management agreements for the
energy centre and undertaking of the installation of the distribution network. Contractors are now appointed and work progressing with groundworks. 
Asset management: Approval and sign off the appointment of framework surveyors to undertake non housing stock Condition Surveys.
Janitorial, Cleaning & Catering: A total of 577,630 free primary school meals were provided this year. Cleaning Services continue to provide enhanced cleaning, fogging,
touchpoint cleaning and additional Janitorial support across all Council Buildings. 
Areas for improvement:
International instability are impacting on energy prices and Midlothian current reliance on Carbon based fuel and lack of historical investment in alternative energy
sources makes us potentially vulnerable to increasing and fluctuation prices. Current framework contract agreements are currently protecting the Council from
significant increases. We continue to monitor usage but this will be an ongoing challenge, with the need to also invest in fabric improvements and Net Zero also
presenting a corresponding technical, financial and resource challenge.
Page 111 of 258

Page 112

Housing
Increase the number of homeless households that obtain permanent accommodation, and half the average time taken to complete homeless
duty from 105 weeks to 52 weeks.
Implement Midlothian Council’s Allocation Policy.
Implement the approach to housing those with complex needs through a ‘Housing First’ model.
Review void management to minimise re-let timescales and further development of our tenancy support to improve the sustainability of
tenancies.
Introduce a new strategy to reduce drug deaths within Midlothian homelessness accommodation.
Key highlights
There were 4,612 active housing applicants placed on the Common Housing Register at the end of this reporting period. The total number of lets made to the general
needs applicants this year was 184 and 291 made to homeless applicants. As a snapshot, on the 31st of March we had allocated 322 rooms/properties for those in need of
temporary accommodation. This year we purchased 22 open market properties, and progressed 31 mutual exchanges. This years abandoned tenancy rates remain low at
0.08% of our housing stock. Preventative measures and tenancy support have ensured our eviction rates for this year remain low at 0.01% of our stock.
Re-let time for permanent properties has decreased to 24 days this quarter compared to 45 days at the start of the year in Q1. The length of time homeless applicants
waited until receiving a permanent housing outcome has decreased to 70 weeks from 106 weeks in Q1.
With the change in The Homeless Persons (Unsuitable Accommodation) (Scotland) Amendment Order 2020, we have transformed temporary accommodation in
Midlothian, so no children will be in a B&B, hotel or hostel accommodation for more than 7 days. On 29 November 2022, the Homeless Persons (Suspension of Referrals
between Local Authorities) (Scotland) Order 2022 came into force. This gives people in housing crisis the freedom to settle where they choose with access to the support
they need, and aims to help them integrate more fully into the local community and to reduce repeat homelessness. With both of these significant changes to
homelessness legislation adding challenges to the service, we have not breached these orders.
The new hostel accommodation at Jarnac Court was opened providing both accommodation and support to our applicants. This newly refurbished site has 22 rooms for
temporary accommodation for our homeless customers.
The Scottish Housing Regulator met with Housing Services to review and discuss our engagement plan surrounding homelessness and health and safety within our
tenancies. In addition, the Scottish Housing Network concluded a benchmarking exercise against similar sized Local Authority Housing teams. Both meetings praised our
material improvements around housing and homelessness and supported the continuation of engagement going forward. 
Work continues as part of the resettlement schemes to support and provide routes for people who may be fleeing conflict from a range of different countries.
Holistic
Modern
Hub and Spoke
One size fits one
232 211 226
309
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Number of clients accessing
homelessness advice and
assistance
96 112 114
149
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Total number of housing lets
39 45
36
25 24
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Re-let time permanent
accommodation properties
(calendar days)
Target (35 days)
85
106 121
76 70
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Length of time (weeks)
homeless applicants wait until
receiving a permanent housing
outcome
Target (85 weeks)
Page 112 of 258

Page 113

Neighbourhood Services 
Transform service delivery through the adoption of digital and mobile platforms. 
Improve and expand active travel and public transport for Midlothian residents. 
Continue to progress actions to reach the Scottish Government targets to recycle 70% of all waste. 
Develop a comprehensive asset database management plan for all Neighbourhood Services assets.  
Continue to invest in the workplace across all Neighbourhood Services teams to develop sustainable career pathways and generic
working model to grow talent and foster leadership opportunities. 
Key highlights 
The annual Capital Works Programme for carriageway resurfacing combined with the Residential streets programme continues to make good progress this quarter with
20.10km of carriageway resurfaced over this year (2.89% of the total road network) with our annual target of resurfacing 2.2% of the total road network being exceeded. In
addition, 7.26km of footways were resurfaced this year (1.02%), exceeding our annual target of 0.6%. In addition, there has been significant capital investment in modern
road maintenance equipment including a road planer to remove the surface of roads, specialist rollers, road tar hot box and mobile welfare facilities for staff. The purchase
of a JBC Pothole Pro (PHP) will play a key part in recovering our road and footpath network going forward. 
Successful procurement of new contracts for both lighting capital and traffic signal maintenance will deliver best value for the service. Due to late procurement of these
contract this year, funding has been diverted to the delivery of 1,796 new LED lanterns, anticipated to be complete in May. As a result, 136 lighting column replacements
were installed this quarter with a further 403 units expected to be complete in July. 
Work continues in Waste Services on an options Appraisal with Zero Waste Scotland to consider how waste/recycling might be collected in the future considering the
Household Waste Charter, and the impacts of both the planned Deposit Return Scheme and Extended Producer Responsibility. Planning is on-going regarding the potential
impacts on the service, particularly the kerbside glass collection service.  Target containers returned to retailers or reverse vending points will mean less in collected in
kerbside glass boxes and blue bins which will affect our recycling rates. 
As part of Scottish Government capital spend on play improvements, 20 play areas have been upgraded mainly consisting of replacing old and worn equipment. Play areas at
Danderhall and Kings Park Nursery were completed this year with new play equipment and planting. Waterfall park refurbishment is now complete and North Middleton
Pump Track Pump track completed and is being well used by community. Other works in progression include Burnbrae Primary, Penicuik Park, Millerhill Park. 
The Countryside Ranger Service continues to engage with communities and volunteers on various initiatives such as the Midlothian Outdoor Festival, attracting 1,072
visitors taking part in walks, talks and activities throughout the county. Tree survey work was completed on Penicuik to Dalkeith walkway, Springfield Mill and Straiton pond.
In addition, the ranger service secured partnership funding with Scottish Water for a ranger post at Gladhouse reservoir and delivery of equipment as part of the Scottish
Government Nature Restoration Fund for biodiversity which will be utilised for maintenance of grassland and wild flower meadows. Extensive biodiversity works were
completed to restore 2 ponds at Vogrie and Straiton ponds. A new pond was created on the Penicuik to Dalkeith walkway.  Green flags were awarded to Vogrie Country Park
and Loanhead Memorial Park. This year 5,604 volunteer hours were spent in countryside sites ensuring an attractive, safe and welcoming environment for all to enjoy. 
Holistic
Sustainable
Preventative
One size fits one
47.5%
51.9% 48.2%
43.7%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
% of total household waste that
is recycled (Tonnes)
Target (54%)
702
0 0 5
136
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Number of lighting columns
replaced (cumulative)
Annual Target (131)
0.54%
0.12%
0.27% 0.43%
1.02%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
% of the footpath network
resurfaced
Annual Target (0.60%)
2.05%
0.34%
1.38%
2.20%
2.89%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
% of the road network
resurfaced (cumulative)
Revised Annual Target (2.2%)
Page 113 of 258

Page 114

Planning and Economy
Achieve the aims set out in the Planning Performance Framework (PPF)
Continue to embed the Climate Change Strategy and deliver against the action plan.
Implement year 3 of a 5 year Penicuik Heritage project which delivers public realm improvements and investment in heritage assets in the town
centre
Draft and adopt supplementary guidance on the ‘Quality of Place’ which will be used as a tool to enhance place-making within Midlothian
Draft and adopt supplementary guidance on ‘Developer Contributions’ which will be used as a tool to secure financial contributions towards
infrastructure to meet the demands arising from new development
Implement the statutory requirements of the new Planning Act 2019 which places additional burdens onto the Planning Service
Deliver on the objectives identified in the Strategy for Growth 2020-25
Maintain and grow the client reach of Business Gate way services in Midlothian and continue to develop locate in Midlothian
Key highlights
The Business Gateway team continue to promote localised procurement with clients, encouraging registration with the Supplier Development Programme and Public
Contract Scotland (PCS).  The team also continue to promote the social enterprise model to clients where their plans, objectives and values align to the model.
Contributing to Community Wealth Building objectives, the team continue to support the projects from Social Enterprise Conversation sessions as they develop. The
“Newtongrange Development Trust and a Social Entrepreneur” session was held last quarter and two Social Enterprise Conversations were held in Bonnyrigg and Roslin
(and surrounding areas) this quarter.
The level of Business start-ups has increased from 6 in Q2 to 63 in Q4, most of these had accessed pre-start support in 2021/22 and some from earlier this financial year.
This reflects the continued and focused activity of our dedicated Start Up Adviser and broader economic trends including:
• Part time work sufficient before but not during cost of living crisis.
• Developing “side hustles” in order to create additional income to cover gaps in earnings, whilst remaining in employment.
• Redundancies or threat of job loss motivating clients to investigate self-employment.
The total number Business start-ups this year was 118. This should realise a forecasted creation of 142 jobs, with quarter 4 jobs forecasted to be 74.
Following the 2021/22 Planning Performance Framework submission to the Scottish Government, the RAG rating feedback report was received in December 2022 and for
the first time all 15 performance markers were rated ‘green’ giving no cause for concern. The 15 performance markers form the basis of the assessment of the Council’s
Planning Service and as a result no areas were identified for improvement and no indications where some specific attention is required.
Following the adoption of the National Planning Framework No.4, the Service has formally commenced its review of the Council’s adopted spatial strategy, the Midlothian
Local Development Plan – the first phase consists of engagement with community groups, key agencies, the development industry, local residents and elected members.
Sustainable
Preventative
Holistic
Hub and Spoke
38
23
6
26
63
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Number of new Business
start ups (LGBF)
80% 66% 80% 85% 85%
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Q4
22/23
Determine 80% of planning
applications within target (2
months for a local application
and 4 months for a major
application)
Target (80%)
Locate in Midlothian website: 10,095visits (1st of April to
10th to November).
1,880 ‘Business Gateway Midlothian’ followers and 1,676
‘Locate in Midlothian’ followers across Facebook, Twitter and
Linkedin.  Page 114 of 258

Page 115

g
Protective Services Continue to deliver the Council’s regulatory functions with respect to food hygiene and standards regulations
Regulate Health and Safety across Midlothian through the investigation of workplace accidents
Restart a programme of test purchase for under-age goods
Implement a robust business continuity management system and business continuity approach
Continue to identify and respond to incidents of rogue trading
Key highlights
Public Health and Environmental Protection implemented the short-term let licensing scheme within the time scales prescribed by Scottish Government. To
date only a handful of applications have been received but plans are in place to proactively contact known short-term let hosts early this year to remind
them of the deadline for their license application and publicise the scheme further on our social media platforms. This quarter, software was implemented
which is now integrated with the Council’s website allowing hosts to apply and administer their application by 1st of October 2023.
Air Quality Progress Reports for 2020-21 and 2021-22 were submitted to Scottish Government on 31st October 2022 for appraisal.  Our Air Quality
monitoring programme which had been suspended due to resourcing issues has been successfully restarted. Work has now began on the 2022-23 report.
An Abandoned Vehicle Procedure, introduced during 2022, continues to be refined this quarter but is working well. Officers are having a lot of success in
contacting owners early in the process prior to having to go to formal notice by affixing ‘awareness’ notices at their first visit to the vehicle which encourages
the owners to contact us. This allows the owner to informally deal with the issue before moving to formal notice. In addition, DVLA access that been
achieved this quarter for searches of keeper details for vehicles reported to the authority as being abandoned. This resource can now be used for other
authorised uses within our jurisdiction such as fly tipping and littering.
The Protective Services Business Regulation team hosted a number of visitors who were keen to better understand our roles in food safety and public health,
building relationships for effective joint working. This included deputy CEO of Food Standards Scotland and a Clinical Fellow from the Health Protection
Team. In addition, the Business Regulation Team has been working with an Environmental Health contractor to carry out our lowest risk food premises
inspections.This has allowed the team to progress the backlog of food inspections after all inspection work ceased due to COVID restrictions.
Holistic
Preventative
Hub and Spoke
One size fits one
Please see report below for all Protective Service measures as part of reporting to the Police and Fire Board. Performance indicators marked with
* are part of our Place service plans and quarterly performance reporting. 
Page 115 of 258

Page 116

5
6
4
2
0
1
2
3
4
5
6
7
Q1 22/23 Q2 22/23 Q3  22/23 Q4 22/23
Number of Business
Workplace Health and
Safety proactive inspections
1
0
1
0
0
0.2
0.4
0.6
0.8
1
1.2
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of Business
Workplace Health and
Safety Improvement notices
served
1
6 7
3
0
2
4
6
8
10
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of Business
Workplace Health and
Safety accident
investigations
2
1
0
1
0
0.5
1
1.5
2
2.5
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of Business
Workplace Health and
Safety Prohibition notices
served
64
74
64
74
0
10
20
30
40
50
60
70
80
Q3 22/23 Q4 22/23
Number of liquor licences
applied for granted
6
15
5
15
0
5
10
15
20
Q3 22/23 Q4 22/23
Number of public
entertainment licences
applied for granted
Licensing  Workplace Health and Safety 
Protective Services - Police and Fire Board Quarter 4 report
Other civic
licences applied
for during Q4:
2 Market Operator’s
Licence 
2 Tattoo Licences 
2 Window Cleaning
Licences 
7 Street Trader
Licences 
0 Public Indoor Sport
Licence 
2 Second Hand
Licences 
2 Second Hand Car
Dealer Licences   
Page 116 of 258

Page 117

273 300
243 280
0
100
200
300
400
Q3 22/23 Q4 22/23
Number of Public Health
complaints
received responded to
30
73
4 10
0
10
20
30
40
50
60
70
80
Q3 22/23 Q4 22/23
Number of Abandoned Vehicles
reported notices served
2
1
0
1
2
3
Q3 22/23 Q4 22/23
Number of Abandoned Vehicles
which have been removed for
destruction
Public Health 
35
23
0
5
10
15
20
25
30
35
40
Q3 22/23 Q4 22/23
Number of Planning Application
consultations received
1 Environmental Protection
Abatement notice was served 
1 private water supply
inspection took place this
quarter 
58 Licensing visits took place 
5 private water supply samples
were obtained in Q4 
Page 117 of 258

Page 118

Civil Contingencies and events 
Multi-agency Exercises, Training and Presentations:   
Team Members Participated in: 
• Exercise JANUS 23 – Notification exercise relating to a Torness Off-Site
Emergency. This type of exercise occurs on an annual basis. 
• Scottish Risk Assessment Challenge Workshop 3, Pandemic, Emerging
Infectious Disease, Failure of the National Electricity Transmission System, ie
major power outage. 
• Exercise SAFE STEEPLE, Counter Terrorism exercise involving participants from
the Lothian and Borders CONTEST Group and Lothian and Borders Local
Resilience Partnership – plus additional, some senior, representatives from
partner organisations, including Midlothian Council. Team was also involved
in the planning for this exercise. 
• Exercise MIGHTY OAK, national exercise to examine impacts and mitigations
in relation to a National Power Outage. Midlothian Council participated in
discussions involving the three Local Resilience Partnership within the East of
Scotland Regional Resilience Partnership area. 
• Familiarisation sessions on the use of Airwave handsets, utilising the
Interoperability Bronze handsets held by Police Scotland. 
• A number of briefing sessions on the Protect Duty/Martyn’s Law, UK legislation
currently being developed. A Draft Bill is expected to be put before
Parliament in spring 2023. 
• An ongoing series of briefing/training sessions offered by the Met Office. 
• Resilient Communities virtual conference facilitated by Scottish Government. 
•  “Show and Tell” sessions facilitated by the EoS RRP Coordination Team and
consisting of bite-sizes presentations covering a range of resilience topics. 
Team facilitated:
• Total of 2 attendees on the Feb 23 multi-agency Crisis Management Course
organised by the EoS RRP (attendance was expected to be higher but there
were a number of withdrawals and changes of preference). More
nominations have been submitted for the period Apr – Dec 23 so will be
included in future reports. 
Returns to Scottish Government/Eos RRP/Lothian and Borders LRP
(and others), including:
• Assistance with information for COVID-19 Inquiries
Plans and Procedures: 
Plans updated and issued:
• Emergency Contacts Directory 
Plans updated and awaiting approval:
• Major Accident Hazard Pipelines 
• Torness Off-site Emergency plan – summary document for Midlothian
Council 
Plans in progress:
• Op UNICORN updating in respect of new Monarch. This will tie in with
national guidance, when issued. Midlothian Emergency Plan
(generic document outlining response structures, roles and
responsibilities, links to multi-agency arrangements). 
Business Continuity Plans
• The development of these plans are the responsibility of individual
services as they are closest to the work and can better assess needs
and practicalities, but ongoing engagement and assistance will be
given by the Health, Safety & Resilience Team. To encourage BC
plan development a process of initial engagement with responsible
managers is currently being finalised. 
• A report is being drafted for CMT in respect of a range of measures
to enhance the organisation’s preparedness for emergency
response.
Page 118 of 258

Page 119

Public events 
Ongoing, routine representation at/participation in: 
• Local Resilience Partnership meetings – core group and sub groups. 
• Local Resilience Partnership special work streams – Severe Weather Framework, National Power Outages Framework, Mass Fatalities Framework 
• Lothian and Borders CONTEST group 
• COSLA “All Council” EU-Exit meetings 
• Internal meetings requiring a Contingency Planning presence, including Care for People, Estates Management, internal CONTEST Group, Safety Advisory
Group, Business Continuity. 
• Local Authority Resilience Group Scotland (LARGS) networking meetings. 
Ongoing monitoring of events and/or live incidents – disseminating information internally and liaison with external organisations as required. 
To note: Following attendance at meetings, seminars, presentations, training sessions, a summary of all pertinent information is shared to senior managers and
other colleagues as appropriate and invitations to shared where the subject might be direct interest to other services/partners. 
25 23
43
62
0
10
20
30
40
50
60
70
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of planned public event
notifications received
37
19
15
28
0
5
10
15
20
25
30
35
40
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of planned public events
presented at the Safety Advisory
Group
Page 119 of 258

Page 120

3
1
4
0
0
1
2
3
4
5
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of Food Hygiene
Improvement notices
served
4
1
2
1
0
1
2
3
4
5
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of Food Law
Remedial Action notices
served
146
116
88 95
142
110 88 94
0
50
100
150
200
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of Food Law service
requests/complaints (food
safety and food standards)
received responded to
72 59
107 117
0
20
40
60
80
100
120
140
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of Food Law
interventions carried out
(food hygiene and food
standards)
23
17
22
30
0
5
10
15
20
25
30
35
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of Food Law written
warnings (letters/reports provided
that contains serious/significant
contravention or numerous
contraventions)
Food Hygiene and Standards 
Any other Food Hygiene and standard
notices served: 
No Notices served in Quarter 4 
93% of Food Law interventions were
completed in line with the Food Service
Plan in Q4 
13 Food/non-food Samples
were taken in Q4 
Page 120 of 258

Page 121

72
82 75
58
72
82 75
58
0
10
20
30
40
50
60
70
80
90
100
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of consumer complaints
received responded to
33
41 42
28
0
5
10
15
20
25
30
35
40
45
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of intelligence logs
received
0
1 1 1
0
1
2
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of reports to
Procurator Fiscal
36
44
34
62
0
10
20
30
40
50
60
70
Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
Number of
inspections/interventions
Trading Standards 
*Performance indicator forms part of our Place service plan and
quarterly performance reporting.
Trading Standards Campaigns/Joint working/Initiative details: 
1. 135 disposable vapes said to have 3,500 puffs each were seized from two shops. They all
vastly exceeded the 2ml nicotine content permitted in the UK. All small shops in Midlothian
received a letter from Trading Standards advising of this problem which also identified 10
brand codes of Elf bars which had to be removed from sale. 
2. As part of a Scotland-wide project, Trading Standards signed up, and provided certificates
to, 5 self-storage businesses who will comply with a Code of Practice to prevent the storage of
counterfeit goods. 
3. Continued to contact residents, 17 this quarter, who have responded to scams according to
historic information supplied by the National Scams Team. 
Page 121 of 258

Page 122

Page 122 of 258

Page 123

1
Balanced Scorecard Indicators 
2022-2023 
This section of the Council report is presented using the Balanced Scorecard approach. The four
Balanced Scorecard perspectives and key areas of focus are shown in the following table and the
associated key indicators that follow are drawn from across the Councils services. 
Customer/Stakeholder Financial Health
• Improving outcomes for children, young
people and their families 
• Ensuring Midlothian is a safe place to live,
work and grow up in 
• Creating opportunities for all and reducing
inequalities 
• Growing the local economy and supporting
businesses 
• Responding to growing demand for
Housing and Adult Social Care services 
• Maintaining financial sustainability and
maximising funding sources 
• Making optimal use of available resources 
• Reducing costs and eliminating waste 
Internal Processes Learning and Growth
• Improving and aligning processes, services
and infrastructure 
• Developing employee knowledge, skills and
abilities 
• Improving engagement and collaboration 
• Developing a high performing workforce 
Each of the perspectives shown above are supported by a number of key measures and indicators which
ensure that the Balanced Scorecard informs ongoing performance reporting and helps to identify areas
for further improvement. The strategy map below provides an at a glance summary of the key
performance indicators identified for the Single Midlothian Plan and under each of the perspective
headings of the Balanced Scorecard. Detailed performance data is available in the quarterly service
performance reports. 
Item 5.6
Page 123 of 258

Page 124

2
Single Midlothian Plan - Key Indicators 
Individuals and communities have improved health and learning outcomes 
PI Description 2017/
18
2018/
19
2019/
20
2020/
21
2021
/22
2022/23
Value Value Value Value Value Value Target Status
Return to working operational capacity provision for
Ageing Well, volunteering and participation by April
2023.
739 21,446 21,427 3,895 18,394 24,056 20,000 
No of referrals to VOCAL      526 400 
The number of people who participated in Level 1
trauma training   
269 90 359 400 
The number of people who participated in Level 2
trauma training     
107 40 
Annual number of CAMHS referrals 591 774 643 520 747  No data
yet 
Sustain Participation Measure at 1% above national
average   
1.3%  1% 1% 
Track number of qualifications for adults through
NOMIS     
74% Data only 
CLD Strategic Plan Actions are on target which will
contribute to Covid-19 recovery and engagement     
Yes Yes 
CLD Strategic Plan Actions are on target which will
contribute to Improving social interaction, health,
wellbeing and poverty     
Yes Yes 
CLD Strategic Plan Actions are on target which will
contribute to Pathways to learning, personal
development and employment     
Yes Yes 
Page 124 of 258

Page 125

3
PI Description 2017/
18
2018/
19
2019/
20
2020/
21
2021
/22
2022/23
Value Value Value Value Value Value Target Status
CLD Strategic Plan Actions are on target which will
contribute to Digital and resilient communities of the
future     
No Yes 
CLD Strategic Plan Actions are on target which will
contribute to Midlothian being carbon neutral by 2030     
No Yes 
CLD Strategic Plan Actions are on target which will
contribute to Enhancing our workforce and volunteer
skills     
Yes Yes 
Review draft IOM plan of action for whole system
approach to Type 2 Diabetes and agree priorities    
N/A Yes Yes 
No child or household living in poverty 
PI Description 2017/
18
2018/
19
2019/
20
2020/
21
2021/
22
2022/23
Value Value Value Value Value Value Targe
t
Status
Midlothian Citizen Advice Bureaux (CABs) will
generate an income maximization of £625k per
quarter
£3,704,
161
£3,352,
380
£4,401,
850
£3,055,
703
£5,703,
704 
No
data
yet 
Number securing employment through participation in
employability programmes (Target: NOLB -  ; PES - ;
YPG -  ; LTU – 20 places; IFS - 6)     
367 Data
only 
Reduce the number of adults aged 16 to 64
economically inactive in Midlothian - Tracking Only    
19.4% 19.4% 22.9% 
Relative to Scotland, Midlothian can demonstrate a
1% reduction in child poverty. Currently the Scottish
Average is 22% and Midlothian is 22.5%
22.5% 22.5% 25%  23.9%  No
data
yet 
Significant progress is made towards net zero carbon emissions by 2030 
PI Description 2022/23
Value Target Status
Review of the range of extant carbon calculation methodologies and tools in use in
government, academia and the private sector undertaken (to note this indicator forms
part of a three year plan)
Yes Yes 
Climate Emergency group partners liaise with Midlothian Council Education service and
other relevant bodies (to note this indicator forms part of a three year plan)
Yes Yes 
Climate Emergency group partners help take forward the Midlothian allotment and food
growing strategy (to note this indicator forms part of a three year plan)
No Yes 
Page 125 of 258

Page 126

4
Customer Perspective - Adult, Health and
Care 
1. Adult Health and Care 
Performance Indicator 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Value Value Value Value Value Value Target Status
Number of individuals referred through
the Safe and Together approach.  
7 4 4 5 4 
Reduce the number of emergency
admissions for people aged 75+ (RIE &
WGH)
2,393 2,266 2,693 2,409 2,489 N/A Data only 
Total number of completed Adult Carer
Support plans (cumulative)  
665 1,623 2,010 808 Data only 
Number of individuals accessing the
Midlothian Access Point
949 1,092 911 605 1,446 1,361 600 
Number of Health & Social Care staff
who have participated in face to face or
on-line training
1,741 1,595 979 1,171 1,021 1,082 Data only 
Decrease the percentage of falls which
result in a hospital admission for clients
aged 65+
3.8% 7% 4.4% 3.77% 2.32% 2.05% 6% 
Maintain at zero the number of patients
delayed in hospital for more than 2
weeks at census date
16 20 1 4 10 6 0 
Percentage of people aged 65 and over
with long-term care needs receiving
personal care at home  (LGBF)
68.04% 50.4% 52.54% 53.6% 58.93% N/A Data only 
Page 126 of 258

Page 127

5
Customer Perspective - Community Safety 
2. Community Safety 
Performance Indicator 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Value Value Value Value Value Value Target Status
% of satisfactory complete Community
Payback Orders
67% 68% 61.8% 78% 73.4% 70% 80% 
Percentage of all street light repairs
completed within 7 days (cumulative)
90.6% 100% 80.5% 94% 100% 98.74% 90% 
Page 127 of 258

Page 128

6
Customer Perspective - GIRFEC 
3. Getting it Right for Every Midlothian Child 
Performance Indicator 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Value Value Value Value Value Value Target Status
Number of outcome focused
assessments undertaken (cumulative)
1,006 1,241 1,478 1,045 1,339 1,329 Data only 
Number of referrals to the duty service
(cumulative)
4,893 5,519 5,930 6,043 8,287 9,016 Data only 
Number of foster carers going through
prep groups on a quarterly basis
(cumulative)
53 23 28 27 24 14 Data only 
Number of new foster carers approved
(cumulative)
5 5 1 2 3 1 Data only 
Number of foster carers de-registered
quarterly (cumulative)
3 4 2 5 5 4 Data only 
Number of permanence LAAC 
Reviews happening quarterly
(cumulative)
16 37 29 23 10 27 Data only 
Number of children matched in quarter
– (average months from perm LAAC to
matching panel) (cumulative)
12 6 7 2 8 4 Data only 
Number of places taken at residential
houses - capacity 12
10 7 12 12 12 10 Data only 
The number of children living in kinship
care
66 53 70 61 61 59 Data only 
The number of children living in foster
care
86 63 68 65 65 61 Data only 
Number of Midlothian children on the
Child Protection Register
36 51 53 36 38 43 Data only 
Page 128 of 258

Page 129

7
Performance Indicator 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Value Value Value Value Value Value Target Status
Rate per 1,000 population of Midlothian
children on the Child Protection
Register in relation to the Scottish
average
2.2 3 3 2 2.1 2.4 Data only 
% of Child Protection plans which have
integrated chronology
94% 96% 99% 93% 79% 94% Data only 
Rate per 1,000 of Midlothian Looked
After Children AT HOME in comparison
with the Scottish average
3.7 4.2 3.1 1.6 1.5 1.3 Data only 
Rate per 1,000 of Midlothian Looked
After and Accommodated Children in
comparison with the Scottish average
9.4 7 7.9 7.3 7 6.7 Data only 
The number of looked after children
and young people not in residential
placed outwith Midlothian
24 16 13 9 11 8 Data only 
The number of looked after children
and young people placed in Residential
School outwith Midlothian
8 6 4 3 2 2 Data only 
The number of young people who are
allocated/engage with Through Care
and After Care service
90 65 56 51 64 64 Data only 
Child Protection: % of Core Group
meetings held within a 8 week period.
100% 99% 98% 100% 98% 99% 100% 
Child Protection: % of Core Group
meetings held within 15 days for Initial
93% 87% 79% 89% 86% 89% 100% 
Improve Primary School attendance 94.5% 94.86% 94.04% 95.06% 92.25% 93.03% 95% 
Improve Secondary School Attendance 89.4% 89.34% 89.34% 90.97% 87.36% 87.11% 91.5% 
Reduce exclusions in Primary schools
(Rate per 1,000)
74 94 8.44 6.16 3.04 3.03 15 
Reduce exclusions in Secondary
schools (Rate per 1,000)
299 210 14.8 13.7 20.2 22.6 15 
Number of Children looked after away
from home
181   150 140 140 Data only 
Percentage of Midlothian Care
Experienced school leavers
progressing to positive destinations
72.73% 62.5% 92.31% 80.95% 88% 90% 85.96% 
Page 129 of 258

Page 130

8
Customer Perspective - Improving
Opportunities for Midlothian 
4. Improving Opportunities for Midlothian 
Performance Indicator 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Value Value Value Value Value Value Target Status
Amount of household income gained by
the Welfare Rights Team
(accumulative)
£3,408,15
1
£4,407,37
3
£4,411,10
5
£4,226,84
8
£4,320,09
0
£3,912,83
7
£2,250,00
0
Midlothian Citizen Advice Bureaux
(CABs) will generate an income
maximization of £625k per quarter
£3,704,16
1
£3,352,38
0
£4,401,85
0
£3,055,70
3
£5,703,70
4
£5,119,20
9
£2,500,00
0
% of those leaving school secure a
positive destination
94.35% 93.81% 94.47% 95.44%  95.5% 95% 
Number of Midlothian Active Choices
(MAC) attendees during quarter
(quarterly)
9,263 11,433 1,997  1,287 1,255 Data only 
Number of activities offered by Ageing
Well to 50+ age groups (quarterly)
23 15 15 19 45 54 15 
Tone zone retention rate (quarterly) 49.25% 53.5% 55% 52% 74% 68% 55% 
Percentage of Unemployed People
Assisted into work from Council (LGBF)
6.71% 25.47% 14.25% 12.94% 16.17% LGBF
data not
available
yet
Data only 
Page 130 of 258

Page 131

9
Customer Perspective - Sustainable Growth
and Housing 
5. Sustainable Growth 
Performance Indicator 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Value Value Value Value Value Value Target Status
Number of environmental awards e.g.
Green flags
5 2 2 1 1 2 2 
Percentage of Council fleet which is
'Green' (cumulative)
5.41% 5.34% 8.2% 8.4% 8.2% 8.2% 8% 
Percentage of waste going to landfill
per calendar year (quarterly)
40.9% 24.6% 11.5% 11.5% 12.3% Data not
available
yet
15.0% 
Re-let time permanent accommodation
properties (calendar days)
50 days 49 days 54 days 46 days 46 days 33 days 35 days 
Percentage of the Council's housing
stock meeting the 'Modern facilities &
services' Scottish Housing Quality
Standard criteria
100% 100% 98.4% 98.4% 98.4% 98.4% 100% 
Number of New Business Start Ups
(LGBF)
202 153 149 74 124 118 Data only  
Street Cleanliness Score  (LGBF) 95.98% 91.3% 93.91% 85.45% 89.1% LGBF
data not
available
yet  
Percentage of total household waste
that is recycled  (LGBF)
51.6% 58.2% 50.8% 47.3% 47.5% LGBF
data not
available
yet
54.0% 
Corporate Indicator - Percentage of the
Council's housing stock meeting the
Scottish Housing Quality Standard
criteria   (LGBF)
96.05% 96.13% 94.3% 98.12% 77.55% 32.28% 100% 
% of total road network resurfaced
(cumulative)
1.3% 1.67% 0.85% 0.54% 2.05% 2.89% 2.2% 
Page 131 of 258

Page 132

10
Financial Health Perspective 
Short Name 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Value Value Value Value Value Value Target Status
Performance against revenue budget £202.932
m
£203.596
m
£206.362
m
£226.262
m
£240.921
m
£270.274
m 
Corporate Indicator - Primary Education -
Cost per pupil  (LGBF)
£5,627.8
7
£5,885.8
3
£5,779.0
1
£6,002.6
4
£6,299.7
0 Data only LGBF 
Annual Data – LGBF Data is
circulated annually by the
Improvement Service.   
22/23 data will be available in
Q4 23/24.
Corporate Indicator - Secondary Education -
Cost per pupil (LGBF)
£7,629.5
6
£7,491.3
0
£7,049.9
9
£7,204.3
5
£7,703.6
2
Corporate Indicator - Pre- Primary
Education - Cost per pupil (LGBF)
£4,721.5
7
£5,144.0
0
£7,551.3
6
£10,243.
85
£9,891.0
0
Corporate Indicator - The Gross Cost of
"Children Looked After" in Residential
Based Services per Child per Week  (LGBF)
£4,105.3
1
£3,877.2
9
£4,268.2
2
£6,890.5
3
Corporate Indicator - The Gross Cost of
"Children Looked After" in a Community
Setting per Child per Week  (LGBF)
£373.37 £354.16 £362.23 £498.43 
Corporate Indicator - Central Support
services as a % of Total Gross expenditure
(LGBF)
4.45% 4.27% 4.09% 3.8% 3.79%
Corporate Indicator - Cost of collecting
council tax per dwelling (LGBF)
£10.17 £7.79 £6.43 £6.29 £8.54
Corporate Indicator - Percentage of invoices
sampled and paid within 30 days (LGBF)
93.1% 91.1% 89.6% 92.3% 93.1% 90.0% 95.0% 
Corporate Indicator - Net cost of waste
collection per premise (annual)   (LGBF)
£81.71 £73.57 £53.55 £71.16 £60.45 
Data only LGBF 
Annual Data – LGBF Data is
circulated annually by the
Improvement Service.   
22/23 data will be available in
Q4 23/24.
Corporate Indicator - Net cost of waste
disposal per premise (annual)   (LGBF)
£93.44 £93.16 £57.16 £34.91 £53.53
Corporate Indicator - Net cost of street
cleaning per 1,000 population   (LGBF)
£12,975.
91
£12,984.
45
£11,356.
26
£14,020.
40
£11,744.
82
Corporate Indicator - Cost of maintenance
per kilometre of roads  (LGBF)
£9,029.0
0
£12,594.
00
£8,879.0
0
£7,559.0
0
£8,815.0
0
Corporate Indicator - Cost of Trading
Standards, Money Advice & Citizen Advice
per 1000 population (LGBF)
£5,405.7
1
£5,193.0
0
£4,925.0
0
£6,357.0
0
£5,691.0
0
Corporate Indicator - Cost of environmental
health per 1,000 population.  (LGBF)
£12,432.
01
£9,135.0
0
£8,779.0
0
£8,979.0
0
£15,682.
00
Corporate Indicator - Older Persons Home
Care Costs per Hour (Over 65)  (LGBF)
£40.53 £37.62 £20.57 £26.12 £27.88
Corporate Indicator - Self Directed Support
(Direct Payments + Managed Personalised
Budgets) spend on adults 18+ as a % of
total social work spend on adults
18+ (LGBF)
4.75% 4.49% 5.06% 4.32% 4.41%
Corporate Indicator - The Net Cost of
Residential Care Services per Older Adult
(+65) per Week (LGBF)
£621.35 £611.36 £593.65 £603.71 £654.56
Page 132 of 258

Page 133

11
Learning and Growth Perspective 
Short Name 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Value Value Value Value Value Value Target Status
Percentage of employees who are
performing as 'Outstanding' in their
individual performance framework
6.7% 6.31% 7.01% 9.67% 9.2% 7.27% Data only 
Percentage of employees who are
performing as 'High' in their individual
performance framework
25.55% 26.79% 20.27% 24.18% 22.81% 20.57% Data only 
Percentage of employees who are
performing as 'Good Overall' in their
individual performance framework
39.9% 47.68% 50.06% 54.18% 46.86% 52.17% Data only 
Percentage of employees who are
performing as 'Below Standard' in their
individual performance framework with
appropriate improvement plans in place
0.59% 0.85% 0.25% 0.77% 0.56% 0.54% Data only 
Percentage of staff turnover (including
teachers)
10.3% 10.38% 9.22% 5.9% 9.5% 10.36% Data only 
Corporate Indicator - The Percentage of
council employees in top 5% of earners that
are women (LGBF)
49.0% 49.2% 51.0% 55.1% 55.0% 56.9% 50.0% 
Corporate Indicator - The gender pay gap
between average hourly rate of pay for male
and female - all council employees (LGBF)
2.32% 3.94% 3.06% 2.7% 2.52% 2.86% Data only
LGBF 
Corporate Indicator - Sickness Absence
Days per Employee (All employees)
7.5 8.55 9.7 7.26 9.33 11.04 Data only
LGBF 
Corporate Indicator - Teachers Sickness
Absence Days (LGBF)
4.59
days
5.15
days
5.80
days
3.47
days
4.61
days
5.62
days
Data only
LGBF 
Corporate Indicator - Local Government
Employees (except teachers) sickness
absence days (LGBF)
8.59
days
9.86
days
11.19
days
8.76
days
11.22
days
13.20
days
Data only
LGBF 
Page 133 of 258

Page 134

12
Internal Processes Perspective 
Short Name 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Value Value Value Value Value Value Target Status
% of internal/external audit actions
progressing on target.   
95.4% 91.67% 100% 85% 
% of high risks that have been reviewed in
the last quarter
100% 100% 100% 100% 100% 100%` 100% 
Corporate Indicator - Percentage of adults
satisfied with libraries  (LGBF)
66% 69.07% 62.4% 64.07%  Data only LGBF 
Annual Data – LGBF Data is
circulated annually by the
Improvement Service.   
22/23 data will be available in
Q4 23/24.
Corporate Indicator - Percentage of adults
satisfied with parks and open spaces 
(LGBF)
78.67% 84.67% 81.33%  83%
Corporate Indicator - Percentage of adults
satisfied with leisure facilities (LGBF)
74.33% 70.87% 63.2% 60.2% 
Corporate Indicator - Percentage of Adults
satisfied with local schools (LGBF)
78.67% 74.63% 69.3% 64.63% 
Corporate Indicator - Percentage of Adults
satisfied with refuse collection   (LGBF)
89.67% 87.1% 83.1% 80.1% N/A
Corporate Indicator - Percentage of adults
satisfied with street cleaning   (LGBF)
71.33% 67.97% 62.3% 58.63% N/A
Total number of complaints received
(quarterly)   
7,337 6,450 6,459 Data only 
Percentage of complaints at stage 1
complete within 5 working days   
91.32% 87.7% 90.67% 95% 
Percentage of complaints at stage 2
complete within 20 working days   
78.57% 70.21% 77.55% 95% 
Page 134 of 258

Page 135

1
Midlothian Council Report
2022/23 
Progress Against Strategic Outcomes
Individuals and communities in Midlothian will be able to lead healthier, safer, greener and successful lives by 2030. 
No child or household need live in poverty. Midlothian will be a Great Green Place to Grow by achieving our net zero
carbon ambitions. 
We are focussing on our new Single Midlothian Plan to reduce the impact of poverty on our most vulnerable. 
Midlothian's Child Poverty report 2020 set out Midlothian's commitment to eradicating child poverty by 2030. 
The three drivers for achieving this are: 
• reduce the cost of living
• increase income from employment
• and increase income from social security and benefits in kind 
We are also committed to improving health outcomes by working with partners to develop and maintain services
close to home that support the needs of local people 
The Climate Emergency Group's values are to get to net zero equitably, taking into account different people and
communities’ capacities and abilities to get there.  Scotland's national target is to be Net Zero by 2045. Following the
motion to Council in 2019, in January 2020 the Community Planning Partnership (CPP) agreed to make meeting the
Climate Emergency target of 'Reducing Midlothian Carbon emissions to net zero by 2030' a priority in its shared
partnership work. 
Whilst a full update for the performance for each of the Council’s Service areas is published separately, this report
reflects an overview of the key service updates, against the thematic areas of the Single Midlothian Plan. 
From 1st July 2022,the Community Planning Partnership identified our outcomes which are:
• Individuals and communities have improved health and learning outcomes 
• No child or household living in poverty 
• Significant progress is made towards net zero carbon emissions by 2030 
Single Midlothian Plan Themes in 2022/23 
Adult, Health and Care - Achievements
Responding to growing demand for adult social care and health services 
Our Vision: People in Midlothian are enabled to lead longer and healthier lives. 
Our Values: Right support, right time, right place.   
Midlothian Integration Joint Board plan and direct the services that are delivered by Midlothian Health and Social
Care Partnership (HSCP). The HSCP is a partnership between NHS Lothian and Midlothian Council and is
responsible for services that help Midlothian residents to live well and get support when they need it. This includes all
community health and social care services for adults in Midlothian and some hospital based services such as
Accident and Emergency.  
In order to meet the legal requirements of the Public Bodies (Joint Working) (Scotland) Act 2014, the HSCP was
required to develop, consult on, and publish a new 3 year Strategic Plan in 2022. The new Strategic Plan for 2022-25
was published in April 2022
HSCP COVID-19 Response: The Health and Social Care Partnership, its partners and the communities it services
continued to be impacted by the ongoing effects of the COVID19 pandemic. A recent spike in infections over the
winter months coupled with Influenza cases has caused significant pressure on our workforce due to absences. The
Health and Social Care Partnership has maintained delivery of services and continues to work with its partners to
Item 5.7
Page 135 of 258

Page 136

2
ensure resources are being managed and deployed to cover staff absences where needed. The partnership continue
to deliver the vaccination programme across sites in Midlothian. Midlothian Community Hospital have seen a return
in face-to-face outpatient clinics. More recently, guidance around PPE has been further relaxed and there has been
an indication from the World Health Organisation (WHO) that, “with great hope”, the pandemic is at an end. 
Mental Health:  We have successfully made a significant impact on our waiting list from 60 individual's waiting for
MHO report to current waiting list being 18. We continue to monitor the demand and waiting list monthly and are
hopeful that we will be able to maintain a minimal waiting list 
Community Safety – Achievements
Ensuring Midlothian is a safe place to live, work and grow up in
Justice: The Justice Team have continued to deliver a range of interventions that fulfil our statutory requirements,
despite managing a number of vacancies throughout the year. This has included making progress to implement the
national outcomes outlined in the Scottish Government’s Vision for Justice in Scotland.  To ensure that we are able
to provide early interventions at the Court stage we continue to liaise with colleagues locally and nationally to enable
us to offer and provide a range of bail services to those resident in Midlothian.   
Substance Misuse 
Key services based in Number 11 in Dalkeith continued to provide services including outreach treatment, injecting
equipment provision (IEP), Naloxone, and information/advice. Currently, there are challenges with recruitment.
However, the Midlothian Substance Use Service continues to support and treat those individuals who are most at
risk. This includes the provision of Buvidal (an injectable form of Buprenorphine). 
Getting it Right for Every Midlothian Child - Achievements
Improving outcomes for children, young people and their families 
All children, young people, adults and communities in Midlothian are supported to be the best they can be.
This will be achieved through a nurturing, respectful and collaborative approach that promotes wellbeing,
equity, inclusion and lifelong learning. 
The Getting It Right for Every Child Board (GIRFEC) is one of the main drivers for the effective delivery of services to
children. The GIRFEC Plan also known as the Integrated Children’s Service Plan 2020-2023, is a statutory 3 year
plan devised by the local authority and health.  The plan develops key outcomes and priority actions which are
designed to improve the lives of children, young people and families. The GIRFEC outcomes for the final year of the
3 year plan for 2022-23 are: 
1. More children and young people are safe, healthy and resilient
2. More children and young people receive timely and effective mental health support when they need it
3. Inequalities in learning are reduced 
4 key areas for improvement have been identified. 
Priority 1 - Attainment and Achievement 
Priority 2 -  Included, Engaged and Involved: Wellbeing and Equity
Priority 3 - Self-Improving Systems
Priority 4 - Lifelong Learning and Employability 
These key areas will continue to be analysed and improvements will be evidenced throughout the next year. 
Improving Opportunities Midlothian - Achievements
Creating opportunities for all and reducing inequalities
Customer Services Strategy The Customer Service Strategy defines the key drivers that will enable Midlothian
Council to deliver a high level of service to our communities. It outlines the commitment to provide choice to the
customer in the way services are accessed and provided. This includes innovation, partnership working and
optimising the use of technology within resource constraints. The strategy will help us to change the way we deliver
services utilising the latest technologies and linking to national frameworks. 
As one of the fastest growing areas in Scotland, the Council cannot support more customers using the current
resources, systems and processes. This means that the adoption of digital and automated processes will be key to
Page 136 of 258

Page 137

3
continuing to provide a seamless customer journey, satisfying enquiries at the first point of contact and meeting
increased demand. 
Customer self-service and new automated processes can help deliver some key services without customers dealing
directly with a member of staff and could truly transform the way the Council deliver services. Increasing the pace of
digital transformation, particularly in front-facing customer services, will be a corporate priority. 
Sustainable Growth - Achievements
Growing the local economy by supporting business growth and responding to growing demand for housing in a
sustainable environment
“Place is where people, location and resources combine to create a sense of identity and purpose. The Place
service ambition is to deliver joined-up, collaborative, and participative approaches to services, land and
buildings, across all sectors within a place, enabling better outcomes for everyone and increased
opportunities for people and communities to shape their own lives.”
Over recent years, innovative ways of working have been introduced and services adapted at pace to respond to the
needs of our citizens, in particular those experiencing the greatest levels of poverty and inequality. This has resulted
in a complete transformation of how the Council works. Our services are continuing to build on this learning moving
forward, harnessing the energy, flexibility and creativity demonstrated by our workforce, to embed a culture of
continuous improvement and innovation 
Hub and Spoke, one of Midlothian’s key drivers for change, will see a Locality approach to service delivery adopted,
developed in conjunction with community planning partners. The opportunity to review and redesign services that the
pandemic has provided will result in a more efficient and effective operation of sites within local communities. This
will improve service delivery, and ensure better outcomes for local communities. The continued rollout of enhanced
ICT capabilities will strengthen cross service working, produce resource efficiencies and support the localisation of
services. 
Environmental Midlothian Council was one of the first local authorities to sign Scotland’s Climate Change
Declaration, publicly acknowledging the challenges and opportunities that climate change brings with a commitment
to make the Council’s activities net zero carbon by 2030. Work continues to implement the Council’s Climate Change
Strategy and focus continues within Place services to achieve future emissions targets.  The ambitious strategy sets
out how we will reduce our greenhouse gas emissions, encourage and work with others in our community to mitigate
and adapt to changing climate. The strategy incorporates an action plan with a number of initiatives and ongoing
programmes which together are helping to reduce our emissions and carbon footprint. 
Economic and Regeneration Midlothian Council’s Economic Renewal Strategy sets out our ambitious approach to
managing the transition from lockdown and planning for the longer term challenges the local economy will face. The
strategy aims to mitigate the adverse economic impact on the local economy from COVID-19. Key aims are to
protect jobs and aid business recovery using a place based partnership approach that maximises the opportunities
developing from the pandemic. Taking this partnership approach, the strategy will foster entrepreneurship, upskilling
and training, addressing gaps in the market and changing the way business is done to better align this to customer
behaviour. Alongside support for agriculture, tourism and the leisure and hospitality sectors, the council will also
promote local jobs and self-employment opportunities, particularly for young people, to give them the necessary
skills and support they need to benefit from economic recovery. A report on EU-Exit impacts and the economy was
presented to Council in October and work is ongoing with Ekosgen which will inform the refresh of the Economic
Strategy to be presented for approval to Council in June 2023. 
Procurement - The procurement function has a central role in supporting the Council to achieve its strategic
priorities within a constrained financial envelope. Procurement allows the Council to repurpose its spending power to
drive our key strategic priorities and to secure the best possible value and outcomes for Midlothian. Effective
procurement can maximise the value of every pound spent in terms of jobs, skills and supply chain opportunities in
the local community. We will aim to address economic, social and environmental considerations at all stages of the
procurement cycle within the rules of open, fair and transparent competition. 
Capital Programme:  As Scotland’s fastest growing local authority area, it is critical to delivery that investment in
community infrastructure, such as housing, the learning estate, economic investment and green infrastructure, is in
the right place at the right time. This will help our communities to live well, live locally and prosper. 
How we invest in community infrastructure must also respond to changes in our working and living patterns brought
about by the pandemic. Communities need to be able to readily access the services they require. Capital investment
Page 137 of 258

Page 138

4
is also an opportunity to support our local economy through job creation and skills enhancement, particularly in
relation to supporting a transition to a green economy as we invest in sustainable, highly energy efficient buildings. 
As a growing Council, we have the opportunity to transform parts of Midlothian in a way that reflects how we live
now. We will invest in community infrastructure with a focus on place-making, reducing inequalities, improving
economic opportunities and improving education and health and wellbeing outcomes. 
The Capital Investment Strategy brings together many strands of the Council’s activities to build upon our past
successes and drive forward innovation in a co-ordinated and achievable manner for the benefit of Midlothian and its
citizens. 
The Capital Investment Strategy sits centrally within the Council’s future planning activities and in doing so has to
reflect the demands of Council services to ensure positive outcomes are achieved in the right place, at the right time
for the maximum benefit to Midlothian.  The extensive capital programme delivers new schools, a record investment
in council housing, improved community infrastructure, investment in the local transport network and innovative
developments such as the new low carbon heat network in Shawfair. 
To ensure Midlothian is ‘building back better’, this investment is also creating new jobs, apprenticeship opportunities,
opportunities for businesses and communities and families hard-hit by the impact of COVID-19. These new
opportunities help lead the way out of the pandemic and towards a better future for Midlothian. 
The Education Learning Estate Strategy programme has been developed and is subject to regular review
meetings with Education and stakeholders to ensure effective monitoring, reporting and delivery of improvement
and expansion of the Education estate including Early Years provision. This currently covers approximately 30
projects at various stages of development. 
Midlothian Council is overseeing a significant housing programme. Phase 1, now complete, provided 864
additional houses within Midlothian. The total number of new homes from phase 2, 3 and 4 is currently estimated
at 1201, comprising of 489 from phase 2 budget and 712 from phase 3 and 4 budgets. Progress continues with
661 homes currently being constructed on site either through commencement of enabling works or main contract
works as of November 2022. This includes the largest Passivhaus programme in Scotland, with 189 homes to be
built to the exacting Passivhaus standard, in line with Midlothian Council’s Net Zero Housing Design Guide. This
ensures exceptionally high levels of energy efficiency and low utility bills for our residents. 
Digital Strategy and Digital Learning Strategy Supported by the appointment of SOCITIM Advisory (Society for
innovation, technology and modernisation) as a strategic partner and led by the Digital First Board, work progressed
to deliver an ambitious new digital strategy, Digital Midlothian 2021-2023, “Empowering People, Enabling Growth”.
Aimed at improving the way services are delivered to Midlothian citizens, the strategy sets out how local outcomes
will be improved by delivering digital services to digitally 
Housing and homelessness Midlothian Council’s updated Rapid Rehousing Transition Plan (RRTP) sets out key
actions for delivery this year and addresses the next phase in transforming the services provided to meet housing
need. These activities are crucial to reduce the time spent in temporary accommodation, improving the quality of
temporary accommodation provided, continue to deliver Housing First and improve the health and wellbeing of those
most vulnerable households. The plan also explains how Midlothian Council will address the next phase of its
approach to transforming the services provided to those in housing need by developing initiatives with an emphasis
on the prevention of homelessness, tenancy sustainability and early intervention. 
There continues to be a significant demand placed on homeless and temporary accommodation services. A potential
key challenge will be an increase in homelessness as the financial measures put in place to protect households
during the pandemic are now withdrawn, alongside the recent increase in energy, food and fuel costs, requiring a
comprehensive preventative approach as set out in the Council’s Rapid Rehousing Transition Plan. Homelessness is
not inevitable and can often be prevented.  Our vision is for everyone to have a safe, warm and affordable home that
meets their needs.  Working with our partners to prevent homelessness from happening in the first place.
. 
With the change in The Homeless Persons (Unsuitable Accommodation) (Scotland) Amendment Order 2020, we
have transformed temporary accommodation in Midlothian, so no children will be in a B&B, hotel or hostel
accommodation for more than 7 days. 
The Homeless Persons (Suspension of Referrals between Local Authorities) (Scotland) Order 2022 came into force
in the last year. This gives people in housing crisis the freedom to settle where they choose with access to the
support they need, and aims to help them integrate more fully into the local community and to reduce repeat
homelessness. With both of these significant changes to homelessness legislation adding challenges to the service,
we have not breached these orders. 
Page 138 of 258

Page 139

5  
The first year review of the Homeless Prevention Forum took place this year.  This is a partnership arrangement
established 2021, with an aim to reduce children going into homelessness through evictions.  Referrals are triggered
within Midlothian Council when there is risk of eviction.  
The new hostel accommodation at Jarnac Court was opened providing both accommodation and support to our
applicants. This newly refurbished site has 22 rooms for temporary accommodation for our homeless customers. 
The Scottish Housing Regulator met with Housing Services to review and discuss our engagement plan surrounding
homelessness and health and safety within our tenancies. In addition, the Scottish Housing Network concluded a
benchmarking exercise against similar sized Local Authority Housing teams.  Both meetings praised our material
improvements around housing and homelessness and supported the continuation of engagement going forward.   
Throughout the year we have worked to better improve communications with our housing applicants and tenants,
housing duty telephone lines were moved onto the main council Liberty telephony system allowing call recording and
ability to report on call handling performance. New private meeting room spaces were opened in Midlothian House
for customer engagement. As part of the Midlothian Council rent consultation which presented options for all tenants
and waiting list applications on setting next year’s sent levels, a series of five public meetings were held across
various locations in Midlothian which were promoted by staff, social media and text messaging.   
Work continues as part of the resettlement scheme to support and provide routes for people who may be fleeing
conflict from a range of different countries. This includes, Afghan Resettlement Schemes, the Homes for Ukraine
Scheme which provides a range of routes for people fleeing the conflict in Ukraine and the Asylum Dispersal
Programme through which people seeking asylum are provided with accommodation in specified nations. The main
activities this year were, our third Military of Defence sub-let property in Milton Bridge and two small hostels were
transformed into large family accommodation in Dalkeith.  We have worked with Social Work Children and Families
to support with responsibilities around Unaccompanied Asylum Seeking Children. 
Challenges and Risks
Financial position: Council approved the 2023/24 budget at its meeting on 21 February 2023. Delivery is reliant on
a combination of savings and service reductions and includes the use of retrospective service concession savings
and earmarked Covid recovery reserves. Whilst the 2023/24 budget is agreed, the challenge remains to reach
ongoing financial sustainability. Cost and income projections for future years will be embedded in the Council’s
Strategic Blueprint which contains a range of transformation themes to drive towards a position of financial
sustainability. Close working continues with the Business Transformation Steering Group to respond to the
challenge.
Economic pressures:  Inflation, as well as rising energy costs, are affecting the construction industry in Scotland.
The UK is currently experiencing unprecedented adverse market conditions, leading to significant rises in tender
prices for a wide range of materials. There is evidence that inflation of between 10% and 15% beyond BCIS
predictions is affecting projects. The pandemic has also accelerated financial challenges, and the growth from being
the fastest growing local authority in Scotland places significant pressure on Midlothian to be able to deliver services
to its citizens. 
In response to all of these pressures, a range of reprioritisation activity is taking place, with a revised Capital Plan
being considered by the cross- party Business Transformation Steering Group, and options to review what and how
services are delivered as part of the savings measures to reduce the funding gap. 
National Care Service: The estimated funding gap for the next three financial years does not include the associated
costs of the Scottish Government’s National Care Services (Scotland) Bill.  If enacted, the bill would have
fundamental implications for the community and for Local Government itself.  The wide reaching changes in the bill
aim to deliver a National Care Service by the end of the parliamentary term, which will impact on all aspects of the
work of the Corporate Solutions team, including financial implications, in both revenue and capital, our asset base,
our workforce, governance and legal arrangements and our digital infrastructure and platforms. It will require an
immediate focus for the foreseeable future and this will inevitably have implications for other priority work at a time of
continued resource constraint. 
Cost of Living Crisis: Midlothian’s citizens are facing significant financial challenges. The impact on households is
already being noted across the UK with 93% of adults reporting an increase in their cost of living in March 2023
Page 139 of 258

Page 140

6
(Office for National Statistics; Francis-Devine et al, 2022). The UK is currently facing an unprecedented wave of
increasing prices, bills and tax challenges. The 41 year high inflation rate of 10.4% is the main driver of the cost of
living crisis which has outstripped wage and benefit increases. The price rises will impact low-income households
hardest as a larger proportion of their costs are on energy and food. 
The Resolution Foundation estimates that absolute poverty is set to rise in the short-run, from 17.2% in 2021-22 to
18.3% in 2023/24 (or an additional 800,000 people in poverty).     
As our citizens feel the impact of the Cost of Living Crisis, they will seek additional support from public services; in
particular local authorities. To respond to this emerging crisis, the Council established a Cost of Living Task Force
last year, which is chaired by the Council Leader and meets regularly to coordinate mitigating activities. 
The Council established four ‘Warm and Well’ hubs in the Lasswade, Newbattle, Danderhall and Loanhead libraries,
as safe and warm spaces that all Midlothian citizens can access. The hubs provide free hot food and drinks, the
opportunity to socialise with others and access free wifi to work, study, as well as enjoy books, jigsaws and games. 
Page 140 of 258

Page 141

7  Page 141 of 258

Page 142

Page 142 of 258

Page 143

Cabinet
30 May 2023                                       
Item No. 
Title  Inspection of Cherry Road Resource Centre 
Report by: Nick Clater, Head of Adult Services, Health and Social Care 
Report for Decision 
1 Recommendations 
Cabinet is requested to 
1. To note the outcome of the inspection of Cherry Road Resource
Centre by the Care Inspectorate. 
2 Purpose of Report/Executive Summary 
This report advises of 
1. The outcome of the inspection of Cherry Road Resource Centre
2. The actions that are being progressed as a result of the centre 
Date:    10/5/23
Report Contact:  Nick Clater 
Item 5.8
Page 143 of 258

Page 144

2 
3 Background 
3.1 Inspection 
Cherry Road Resource Centre is a Day Service, operated by
Midlothian Council that provides support for adults with Learning
Disabilities. It caters for individuals with complex learning
disabilities and physical disabilities in addition to their Learning
Disability. 
In March 2023 the Care Inspectorate conducted and announced
a short notice inspection of Cherry Road Resource Centre. A
copy of the report is contained in Appendix B of this report. 
3.2 Grades 
Following the inspection the Care Inspectorate awarded the
following grades. 
• How well do we support people's wellbeing? 4 – Good
• How good is our leadership?   4 – Good
• How good is our setting?   3 – Adequate
• How well is our care and support planned? 5 – Very Good 
The Inspection report noted strengths in the following areas: 
• Positive outcomes were being experienced by people using the
service.
• There was a high level of staff consistency, resulting in
meaningful working relationships being established.
• People's care plans were of a very good quality and person
centred to their individual needs. 
The table below lists previous grades for Cherry Road Resource
Centre. It should be noted that these grades are assessed
against a different evaluation framework. 
Date  Care and
Support
Environment Staffing Management
and
Leadership
01 Aug
2018
6 - Excellent
(I) 
Not Assessed Not Assessed 5 - Very
Good (I)
16 Jul
2015
4 - Good (I) 4 - Good (I) 5 - Very Good
(I)
5 - Very
Good (I)
22 Aug
2012 
4 - Good (I) 5 - Very Good
(I)
4 - Good (I) 4 - Good (I)
03 Aug
2011 
3 - Adequate
(I)
4 - Good (I) Not Assessed Not
Assessed
03 Sep
2010 
4 - Good (I) 3 - Adequate
(I)
Not Assessed Not
Assessed
12 Oct
2009
3 - Adequate
(I) 
3 - Adequate
(I) 
4 - Good (I) 4 - Good (I)
Page 144 of 258

Page 145

3 
Date  Care and
Support
Environment Staffing Management
and
Leadership
04 Dec
2008
4 - Good (I) 3 - Adequate
(I) 
3 - Adequate
(I)
4 - Good (I) 
3.2 Areas for Improvement 
The report identifies 2 areas for improvement and makes one
requirement in relation to the Environment. 
The first area for improvement was in relation to inconsistent use
of Personal Protective Equipment PPE in relation to infection
control including COVID-19. 
The second area for improvement was in relation to the
concerns the Care Inspectorate hade in relation to mealtime
experience. It was however recognised that this observation was
made on an occasions where typical mealtime dynamics where
not observed due to the programme of activities on the day of
the inspection. 
A requirement was made in relation to the environment of the
centre with a requirement to develop an improvement plan for
the centre including improvements in the following areas: 
• the flooring of bathrooms and communal areas;
• door frames to support cleaning and provide a pleasant
environment of people;
• ensuring surfaces, (including kitchen worktops), are easy
to wipe clean using appropriate cleaning
• products;
• the redecoration of areas to improve the appearance and
provide high quality facilities; and
• ongoing upkeep of the premises. 
3.3   Actions Being Progressed 
The following actions are being progressed to address the areas
for improvement identified in the inspection report: 
• Subsequent to the inspection staff training has been
completed in relation to use of PPE. In addition since the
report was published further guidance has been released
in relation to the use of PPE which will negate its use in
all except a small number of specific circumstances 
Page 145 of 258

Page 146

4 
• Arrangements for mealtimes have been reviewed in
consultation with service users and their families.
Adjustments have been made in relation to individuals
where these changes were compatible to their support
needs. 
In relation to the requirements to improve the environment the
following actions have been progressed: 
• Action plan for the care Inspector has been completed
highlighting the list full list of repairs and upgrades
required as requested.  The priority areas identified and
an update on action taken and any works currently
completed. 
• E forms action plan completed for discussion with the
inspector 
• Liaising with maintenance managers regarding organising
the priority floor repairs in the toilet/changing spaces
areas 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
There will be some resource implications in relation the environment
improvements. 
4.2 Digital 
There are no digital implications related to this paper. 
4.3 Risk 
There is a reputational risk to Midlothian Health and Social Care
Partnership in relation the standard of care and support it is providing
being affected by the quality of the environment although it should be
stressed that the quality of care was rated Very Good. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
The provision of day services by Cherry Road Resource Centre
addresses inequalities experienced by people with Learning
Disabilities. 
4.4 Additional Report Implications 
Page 146 of 258

Page 147

5 
There are no additional report implications at present. 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Background information/Links 
Page 147 of 258

Page 148

6 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan
Health and Social Care - Increase number of people who report feeling
connected to others. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value 
A.5 Involving Communities and Other Stakeholders 
Subsequent to the inspection there has been consultation with users of
the service and their families in relation to the arrangements for
mealtimes. 
A.6 Impact on Performance and Outcomes 
This report highlight a number of actions that will improve performance
and the outcomes of people using the service. 
A.7 Adopting a Preventative Approach 
Not applicable 
A.8 Supporting Sustainable Development
Page 148 of 258

Page 149

7 
Not applicable 
Page 149 of 258

Page 150

8 
APPENDIX B 
Inspection Report 
Cherry Road
Inspection Report_Ma
Page 150 of 258

Page 151

Cabinet
Tuesday 30 May 2023
Item No   
Follow up Inspection of Burnbrae Primary School 
Report by Michelle Strong, Chief Education Operating Officer, Children, Young
People and Partnerships 
1 Purpose of Report 
The report outlines the outcome of the above inspection as carried out by Education
Scotland in January 2023. 
2 Background 
2.1  In March 2020, HM Inspectors published a letter on Burnbrae Primary School and Nursery
Class. The letter set out a number of areas for improvement which were agreed with the
school and Midlothian Council. HM Inspectors returned to the school to look at how it had
continued to improve its work, and published another letter in February 2022. In January
2023 HM Inspectors visited the school again. The report is now published on the Education
Scotland website and is available from this link.   
2.2  Education Scotland is responsible for inspecting education settings throughout Scotland. 
As this was a follow up inspection the focus was on areas for development from the original
inspection.  
• Improve strategic leadership of quality improvement across the school. Ensure
systems for tracking and monitoring children’s progress lead to a shared
understanding of standards and ultimately raised attainment.
• Improve consistency in the quality of learning and teaching. Develop a framework
for assessment and use assessment information to inform planning for learning to
ensure children’s progress. 
2.3  The inspection team found the following strengths in the school’s work. 
The headteacher has had a relentless focus on improvement. Supported well by the depute
headteachers and principal teachers, she is developing a culture of learning across the
whole school. Together, senior leaders now provide much clearer strategic leadership and
direction to support school improvement. In doing so, the senior leadership team have
established clear expectations for all staff. 
The headteacher is working with local authority representatives to develop and pilot a system
to track and monitor children’s progress in learning. 
In most classes across the nursery and school, children experience positive relationships
with staff and peers. Staff should continue to embed nurturing approaches across all areas of
the school. Senior leaders and staff have developed a relationships policy that outlines their
expectations for children across the school.
Item 5.9
Page 151 of 258

Page 152

Teachers have taken positive steps to develop the Burnbrae learning, teaching and
assessment policy. This sets out clear, shared expectations about the key features of quality
learning and teaching. 
Senior leaders have worked well to ensure that a whole-school assessment strategy is now
in place. Staff gather assessment information which helps to identify children who may
require additional support or challenge in their learning.  
Across both the social and complex needs (SCN) provision and the complex needs (CN)
provision, staff work well together to meet the needs of most children. Effective leadership
supports staff to provide appropriate learning activities that are largely based around
developing children’s skills for life. 
Children in the SCN and CN provisions learn in an appropriate range of environments, both
inside and out, including visits to local amenities to enrich their experiences. 
Staff in the nursery continue to make considerable progress since the original inspection.
Across the nursery, almost all children are engaged and interested in learning. They enjoy
positive and respectful relationships with other children and adults. Overall, practitioners use
skilful questioning to enrich and extend children’s learning. There is a strong sense of
teamwork across the whole nursery setting. 
Practitioners in the nursery have improved how they plan and assess children’s learning.
Planning approaches take good account of children’s needs and particular interests. 
Practitioners make good use of digital tools to record children’s achievements. 
Over the last session, staff at P1 have collaborated well with colleagues from the nursery to
improve interactions, experiences and spaces in the P1 classes. Helpfully, members of the
nursery staff team work closely with P1 classes to provide ongoing support for children and
reciprocal learning opportunities. 
2.4  The following areas for improvement were identified and the local authority will provide a
report on progress within one year of this inspection. 
Senior leaders now need to work with staff to ensure all teachers carry out their
responsibilities in line with expected national standards.  It is now important for all staff to
work together, taking a more active role in delivering school improvement priorities. This will
help to achieve long term, sustainable change and improved outcomes for children. 
The headteacher and senior leaders should continue to work closely with the whole school
community to secure continuous improvement. In doing so, senior leaders will communicate
effectively the work of the school, engaging all stakeholders in a variety of ways. They will
ensure successes are celebrated more widely. 
Senior leaders should continue to monitor children’s progress closely to ensure that new
approaches to planning and assessment have a positive impact on children’s attainment.
Senior leaders need to ensure that all teachers maximise opportunities to plan together, with
a focus on improving further the experiences and outcomes of all children. Teachers need to
continue to develop their use of assessment information to plan learning experiences which
provide an appropriate level of challenge for all children and support them to make the best
possible progress. 
Staff in the social and complex needs (SCN) provision and the complex needs (CN) provision
need to develop children’s literacy and numeracy skills in real life contexts.
Page 152 of 258

Page 153

In the nursery there is scope for the team to develop further ways in which practitioners
share practice with each other to secure greater consistency in high quality learning across
the setting. As planned, staff now need to work with colleagues at P2 and beyond to ensure
children build on their very positive experiences at the early level. 
2.5 Conclusion 
The school has made progress since the original inspection, especially to practice in the
provision classes, across early years and in P1. The local authority will now provide a report
on progress within one year of this inspection. This report will inform any decision made by
Education Scotland regarding further engagement. 
3 Report Implications 
3.1 Resource
There are no financial and human resource implications associated with this report. 
3.2 Risk
Education Scotland’s team of Inspectors visit a sample of education settings every year to
find out how they are performing.  A report is published which informs parents about the key
strengths of the setting and its capacity for further improvement. 
Following the publication of the report further visits may be made to the setting, by the
Education Authority to assist improvement and monitor progress. 
Monitoring, review and evaluation of progress by central officers in the Education Team is
the control measure in place to reduce the risk of failure of settings to demonstrate their
capacity to improve. 
3.3 Single Midlothian Plan and Business Transformation
Themes addressed in this report: 
Community safety 
Adult health, care and housing 
Getting it right for every Midlothian child 
Improving opportunities in Midlothian 
Sustainable growth 
Business transformation and Best Value 
None of the above 
3.4 Impact on Performance and Outcomes
The setting will continue to improve its work in line with the school improvement plan and
central officers in the Education Team will continue to challenge and support the setting in
relation to developing and implementing a range of quality improvement strategies. 
3.5   Adopting a Preventative Approach
The Education (Scotland) Bill aims to take preventative action in order to close the
attainment versus deprivation gap by implementing key policies and programmes which are
designed to target support to children and young people from disadvantaged communities.
Midlothian is highly committed to closing the poverty related attainment gap. 
3.6 Involving Communities and Other Stakeholders
A link to the published report has been made available to Elected Members, parents of
children currently attending Danderhall Primary School and other interested parties. 
Page 153 of 258

Page 154

3.7 Ensuring Equalities
The School Improvement Plan will be screened for equalities implications. 
3.8 Supporting Sustainable Development
The School Improvement Plan allows for sustainable development and improvement. 
3.9 IT Issues
There are no IT implications.
Page 154 of 258

Page 155

4 Recommendations 
Cabinet is asked to: 
(i) Note the content of the inspection follow through report. 
(ii) Pass this report to the Performance, Review and Scrutiny Committee for its
consideration. 
(iii) Congratulate the pupils, parents and staff connected with Burnbrae Primary School 
on the key strengths highlighted in the report. 
15 May 2023
Report Contact:  Julie Fox, Quality Improvement Manager
E-mail:  julie.fox@midlothian.gov.uk 
Background Papers: 
Inspection Report (attached). 
Page 155 of 258

Page 156

Page 156 of 258

Page 157

1   |   Burnbrae Primary School and Nursery Class, Midlothian Council, 5546621 © Crown Copyright
28 March 2023
Dear Parent/Carer 
In March 2020, HM Inspectors published a letter on Burnbrae Primary School and Nursery
Class. The letter set out a number of areas for improvement which we agreed with the school
and Midlothian Council. We subsequently returned to the school to look at how it had
continued to improve its work, and published another letter in February 2022. Recently, as
you may know, we visited the school again. During our visit, we talked to children and worked
closely with the headteacher and staff. We heard from the headteacher and other staff about
the steps the school has taken to improve. We looked at particular areas that had been
identified in the original inspection. As a result, we were able to find out about the progress
the school has made and how well this is supporting children’s learning and achievements.
This letter sets out what we found. 
Improve strategic leadership of quality improvement across the school. Ensure
systems for tracking and monitoring children’s progress lead to a shared
understanding of standards and ultimately raised attainment. 
The headteacher has had a relentless focus on improvement. Supported well by the depute
headteachers and principal teachers, she is developing a culture of learning across the whole
school. Together, senior leaders now provide much clearer strategic leadership and direction
to support school improvement. In doing so, the senior leadership team have established
clear expectations for all staff. They now need to work with staff to ensure all teachers carry
out their responsibilities in line with expected national standards. Staff across the school are
taking opportunities to lead and contribute to school improvement. For example, teachers
and practitioners are leading developments in literacy, numeracy, health and wellbeing,
digital technologies and learning through play at P1. It is now important for all staff to work
together, taking a more active role in delivering school improvement priorities. This will help
to achieve long term, sustainable change and improved outcomes for children. The
headteacher and senior leaders should continue to work closely with the whole school
community to secure continuous improvement. In doing so, senior leaders will communicate
effectively the work of the school, engaging all stakeholders in a variety of ways. They will
ensure successes are celebrated more widely. 
Across both the social and complex needs (SCN) provision and the complex needs (CN)
provision, staff work well together to meet the needs of most children. Effective leadership
supports staff to provide appropriate learning activities, that are largely based around
developing children’s skills for life. Teachers monitor closely and review regularly each child’s
progress in literacy, numeracy and health and wellbeing. Staff use national guidance
appropriately to track and measure the progress of individual children. 
Staff in the nursery continue to make considerable progress since the original inspection.
Across the nursery, almost all children are engaged and interested in learning. They enjoy
positive and respectful relationships with other children and adults. Overall, practitioners use
skilful questioning to enrich and extend children’s learning. There is a strong sense of
teamwork across the whole nursery setting. Practitioners are reflective and regularly share
practice with each other to help drive forward important improvements. They benefit from the
Item 5.9
Page 157 of 258

Page 158

2   |   Burnbrae Primary School and Nursery Class, Midlothian Council, 5546621 © Crown Copyright
well measured support and guidance they receive from the principal teacher and senior
leaders. Staff continue to develop their approaches to self-evaluation. They make good use
of local and national guidance to help inform and shape improvements. There is scope for the
team to develop further ways in which practitioners share practice with each other to secure
greater consistency in high quality learning across the setting. 
The headteacher is working with local authority representatives to develop and pilot a system
to track and monitor children’s progress in learning. Senior leaders meet with teachers three
times a year to discuss the information they have gathered on children’s progress. This helps
them identify children who may require additional support or challenge in their learning. All
teachers have regular opportunities to plan together with stage partners to improve the
consistency of children’s learning experiences. This is helping the majority of teachers to
develop a shared understanding of expected national standards. As a result of these
improvements, these teachers are in a better position to recognise and address gaps in
children’s learning. This supports children in their classes to make better progress. Now all
teachers need to develop their practice together, to support all children to make better
progress and raise attainment across the curriculum. It will be important for senior leaders to
monitor children’s progress closely to ensure that new approaches to planning and
assessment have a positive impact on children’s attainment. 
Improve consistency in the quality of learning and teaching. Develop a framework for
assessment and use assessment information to inform planning for learning to ensure
children’s progress. 
In most classes across the nursery and school, children experience positive relationships
with staff and peers. Staff should continue to embed nurturing approaches across all areas of
the school. Senior leaders and staff have developed a relationships policy that outlines their
expectations for children across the school. Staff should support children to understand how
key elements of this policy link to the school values, children’s rights and learning about
diversity. This will help to develop further an inclusive and respectful environment within all
classes and across the whole school community. 
Teachers have taken positive steps to develop the Burnbrae learning, teaching and
assessment policy. This sets out clear, shared expectations about the key features of quality
learning and teaching. Most teachers welcome the clarity and direction that this policy
provides. There are early indications that new approaches by teachers are leading to
improvements in children’s enjoyment and engagement in lessons. Most teachers plan
collaboratively across levels to improve the consistency and quality of children’s learning
experiences. This is beginning to support staff to have a better understanding of how well
children progress in learning across the school. Senior leaders need to ensure that all
teachers maximise these opportunities to plan together, with a focus on improving further the
experiences and outcomes of all children. 
In most classes, teachers use digital technology well to support and enhance children’s
learning. Most children enjoy opportunities to learn in shared spaces indoors and outdoors
and welcome opportunities to work collaboratively on group tasks and projects. Staff working
with P2 upwards could develop further their use of shared indoor spaces to maximise
children’s learning experiences. In most lessons, teachers provide children with regular
feedback on their learning. In a few lessons, teachers’ feedback identifies what children have
Page 158 of 258

Page 159

3   |   Burnbrae Primary School and Nursery Class, Midlothian Council, 5546621 © Crown Copyright
done well and provides clear next steps for individual learners. Senior leaders have correctly
identified the need for staff to continue to improve the quality and consistency of feedback.
This should help all learners understand what they need to do to make progress in their
learning. 
Senior leaders have worked well to ensure that a whole-school assessment strategy is now
in place. Staff gather assessment information which helps to identify children who may
require additional support or challenge in their learning. However, this does not always
provide learning at an appropriate level for all children. In the majority of lessons, learning is
targeted to different groups of learners. Teachers need to continue to develop their use of
assessment information to plan learning experiences which provide an appropriate level of
challenge for all children and support them to make the best possible progress. 
Children in the SCN and CN provisions learn in an appropriate range of environments, both
inside and out, including visits to local amenities to enrich their experiences. Children are
encouraged to recognise their ‘zones of regulation’ and are supported well to make decisions
based on their feelings. There is scope for staff to develop children’s literacy and numeracy
skills in real life contexts. Staff teach core skills of reading, writing and listening through an
approach that involves many transitions for children in a short period of time. Staff should
now review the impact of this approach to ensure that these many changes do not have an
unintended impact children’s learning. 
Practitioners in the nursery have improved how they plan and assess children’s learning.
Planning approaches take good account of children’s needs and particular interests.
Practitioners make good use of digital tools to record children’s achievements. In addition,
they have maintained paper-based profiles as they recognise that many children prefer this
method to revisit prior learning. Children’s learning journals demonstrate a helpful picture of
their progress across the curriculum. The team identify individual learning priorities for
children in their pre-school year. They should now extend this practice to include the younger
children. 
Over the last session, staff at P1 have collaborated well with colleagues from the nursery to
improve interactions, experiences and spaces in the P1 classes. Helpfully, members of the
nursery staff team work closely with P1 classes to provide ongoing support for children and
reciprocal learning opportunities. Staff at P1 appreciate and benefit greatly from their nursery
colleagues’ expertise. Together, they have created physical spaces both indoors and outside
which enable children to learn in rich and exciting play contexts. As a result, all children are
fully engaged in learning through play. Staff have established an effective balance between
child-led and adult-led learning experiences. This is enabling children to make good progress
in their learning. Staff are developing effective approaches to assess and gather key
information about children’s progress. As planned, staff now need to work with colleagues at
P2 and beyond to ensure children build on their very positive experiences at the early level. 
Page 159 of 258

Page 160

4   |   Burnbrae Primary School and Nursery Class, Midlothian Council, 5546621 © Crown Copyright
What happens next? 
The school has made progress since the original inspection, especially to practice in the
provision classes, across early years and in P1. We will ask for a report from the local
authority on progress within one year of this inspection. This report will inform any decision
made by Education Scotland regarding further engagement. When such a decision is made,
we will write to you again detailing the improvements the school has made and outlining any
further action, agreed with Midlothian Council that we intend to take. 
Susie Smith
HM Inspector 
Page 160 of 258

Page 161

Cabinet
Tuesday 30 May 2023
Item No   
Inspection of Danderhall Primary School 
Report by Michelle Strong, Chief Education Operating Officer, Children, Young
People and Partnerships 
1 Purpose of Report 
The report outlines the outcome of the above inspection as carried out by Education
Scotland which was communicated in their report of April 2023. 
2 Background 
2.1  In February 2023, a team of inspectors from Education Scotland visited Danderhall Primary
School.  The report was published on 24 April 2023, is now published on the Education
Scotland website and is available from this link. 
2.2  Education Scotland is responsible for inspecting education settings throughout Scotland.
They do so using core quality indicators; 
QI 1.3 Leadership of Change 
QI  2.3 Learning, teaching and assessment 
QI 3.1 Ensuring wellbeing, equality and inclusion 
QI 3.2 Raising attainment and achievement 
2.3  The inspection team found the following strengths in the school’s work. 
Confident and articulate children across the school and provision who are enthusiastic about
their learning. They are keen and able to have a greater role in leadership across the school.
The impact of the new senior leadership team. They have improved staff confidence and are
implementing approaches that are beginning to improve children’s attainment. 
Staff work together effectively and support each other well. They recognise the positive
impact of recent changes and are keen to continue to improve the school. 
2.4  The following areas for improvement were identified and discussed with the acting 
headteacher and a representative from Midlothian Council. 
The senior leadership team and staff should continue to develop approaches to evaluate the
quality of the school’s work to identify what needs to improve. As they do so, they should
involve parents, children and other partners to ensure changes lead to improvements. 
Staff should improve learning, teaching and assessment to ensure the needs of all children
are being met. Teaching staff should provide experiences for children that are creative,
motivating and enjoyable. 
The senior leadership team and staff should continue to raise attainment in literacy and
numeracy. They should support children to develop skills and achieve success in a range of
learning contexts. 
All staff should work together to develop a curriculum to support children to have a better
understanding of their own wellbeing and social and emotional needs. 
Item 5.10
Page 161 of 258

Page 162

2.5 Conclusion 
Education Scotland are confident that the school has the capacity to continue to improve and
so we will make no more visits in connection with this inspection. Midlothian Council will
inform parents/carers about the school’s progress as part of its arrangements for reporting
on the quality of its schools. 
3 Report Implications 
3.1 Resource
There are no financial and human resource implications associated with this report. 
3.2 Risk
Education Scotland’s team of Inspectors visit a sample of education settings every year to
find out how they are performing.  A report is published which informs parents about the key
strengths of the setting and its capacity for further improvement. 
Following the publication of the report further visits may be made to the setting, by the
Education Authority to assist improvement and monitor progress. 
Monitoring, review and evaluation of progress by central officers in the Education Team is
the control measure in place to reduce the risk of failure of settings to demonstrate their
capacity to improve. 
3.3 Single Midlothian Plan and Business Transformation
Themes addressed in this report: 
Community safety 
Adult health, care and housing 
Getting it right for every Midlothian child 
Improving opportunities in Midlothian 
Sustainable growth 
Business transformation and Best Value 
None of the above 
3.4 Impact on Performance and Outcomes
The setting will continue to improve its work in line with the school improvement plan and
central officers in the Education Team will continue to challenge and support the setting in
relation to developing and implementing a range of quality improvement strategies. 
3.5   Adopting a Preventative Approach
The Education (Scotland) Bill aims to take preventative action in order to close the
attainment versus deprivation gap by implementing key policies and programmes which are
designed to target support to children and young people from disadvantaged communities.
Midlothian is highly committed to closing the poverty related attainment gap. 
3.6 Involving Communities and Other Stakeholders
A link to the published report has been made available to Elected Members, parents of
children currently attending Danderhall Primary School and other interested parties. 
3.7 Ensuring Equalities
The School Improvement Plan will be screened for equalities implications. 
3.8 Supporting Sustainable Development
The School Improvement Plan allows for sustainable development and improvement. 
Page 162 of 258

Page 163

3.9 IT Issues
There are no IT implications. 
4 Recommendations 
Cabinet is asked to: 
(i) Note the content of the inspection report. 
(ii) Pass this report to the Performance, Review and Scrutiny Committee for its
consideration. 
(iii) Congratulate the pupils, parents and staff connected with Danderhall Primary School 
on the key strengths highlighted in the report. 
9 May 2023
Report Contact:  Julie Fox, Quality Improvement Manager
E-mail:  julie.fox@midlothian.gov.uk 
Background Papers: 
Inspection Report (attached). 
Page 163 of 258

Page 164

Page 164 of 258

Page 165

1   |   Danderhall Primary School, Midlothian Council, 5543126 © Crown Copyright
25 April 2023
Dear Parent/Carer 
In February 2023, a team of inspectors from Education Scotland visited Danderhall Primary
School. During our visit, we talked to parents/carers and children and worked closely with the
acting headteacher and staff.  
The inspection team found the following strengths in the school’s work.
• Confident and articulate children across the school and provision who are enthusiastic
about their learning. They are keen and able to have a greater role in leadership across
the school.
• The impact of the new senior leadership team. They have improved staff confidence and
are implementing approaches that are beginning to improve children’s attainment. 
• Staff work together effectively and support each other well. They recognise the positive
impact of recent changes and are keen to continue to improve the school. 
The following areas for improvement were identified and discussed with the acting
headteacher and a representative from Midlothian Council.
• The senior leadership team and staff should continue to develop approaches to evaluate
the quality of the school’s work to identify what needs to improve. As they do so, they
should involve parents, children and other partners to ensure changes lead to
improvements.
• Staff should improve learning, teaching and assessment to ensure the needs of all
children are being met. Teaching staff should provide experiences for children that are
creative, motivating and enjoyable. 
• The senior leadership team and staff should continue to raise attainment in literacy and
numeracy. They should support children to develop skills and achieve success in a range
of learning contexts.  
• All staff should work together to develop a curriculum to support children to have a better
understanding of their own wellbeing and social and emotional needs. 
Item 5.10
Page 165 of 258

Page 166

2   |   Danderhall Primary School, Midlothian Council, 5543126 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition). Quality indicators help schools, local authorities
and inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Danderhall Primary
School 
Quality indicators Evaluation
Leadership of change  satisfactory
Learning, teaching and assessment satisfactory
Ensuring wellbeing, equality and inclusion satisfactory
Raising attainment and achievement satisfactory
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at: Reports page | Inspection reports | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. Midlothian Council will inform parents/carers
about the school’s progress as part of its arrangements for reporting on the quality of its
schools. 
Monica Reilly 
HM Inspector
Page 166 of 258

Page 167

Cabinet
Tuesday 30 May 2023
Item No   
Inspection of Sacred Heart Primary School 
Report by Michelle Strong, Chief Education Operating Officer, Children, Young
People and Partnerships. 
1 Purpose of Report 
The report outlines the outcome of the above inspection as carried out by Education
Scotland which was communicated in their letter of May 2023. 
2 Background 
2.1  In February 2023, a team of inspectors from Education Scotland visited Sacred Heart
Primary School.  The report was published on 9 May 2023, and is available on the Education
Scotland website at https://education.gov.scot/education-scotland/inspection-
reports/reports-page//?id=4266 
2.2  Education Scotland is responsible for inspecting education settings throughout Scotland.
They do so using core quality indicators; 
QI 1.3 Leadership of Change 
QI  2.3 Learning, teaching and assessment 
QI 3.1 Ensuring wellbeing, equality and inclusion 
QI 3.2 Raising attainment and achievement 
2.3  The inspection team found the following strengths in the school’s work. 
Confident and articulate children across the school and provision who are enthusiastic. 
Steps taken by the acting headteacher to refocus the work of the school on raising
attainment and improving learning and teaching. 
Children who behave well and are pleasant, articulate and keen to learn. They respond well
to the Sacred Heart awards at assembly. 
The nurturing approach of practitioners in the nursery. The nursery team support children to
feel secure, confident and increasingly independent in their learning. 
2.4  The following areas for improvement were identified and discussed with the acting 
headteacher and a representative from Midlothian Council. 
Staff should work together to ensure all children experience high quality learning and
teaching. In doing so, staff should improve the planning of learning, teaching and
assessment and ensure all children receive their entitlement to a broad curriculum. 
Teachers should continue to work together to raise attainment. They should increase their
understanding of national expectations about what children can achieve across all areas of
the curriculum. 
Staff should improve approaches to how they monitor children’s progress in learning. They
should use information on children’s progress more effectively to raise attainment and
improve how children’s needs are met across the school and nursery. 
Staff should improve the quality of learning through play across the early level.
Item 5.11
Page 167 of 258

Page 168

2.5 Conclusion 
As a result of the inspection findings Education Scotland thinks that the school needs
additional support and more time to make necessary improvements. They will liaise with
Midlothian Council regarding the school’s capacity to improve and will return to carry out a
further inspection of the school within one year of the publication of the inspection letter. 
3 Report Implications 
3.1 Resource
There are no financial and human resource implications associated with this report. 
3.2 Risk
Education Scotland’s team of Inspectors visit a sample of education settings every year to
find out how they are performing.  A report is published which informs parents about the key
strengths of the setting and its capacity for further improvement. 
Following the publication of the report further visits may be made to the setting, by the
Education Authority to assist improvement and monitor progress. 
Monitoring, review and evaluation of progress by central officers in the Education Team is
the control measure in place to reduce the risk of failure of settings to demonstrate their
capacity to improve. 
3.3 Single Midlothian Plan and Business Transformation
Themes addressed in this report: 
Community safety 
Adult health, care and housing 
Getting it right for every Midlothian child 
Improving opportunities in Midlothian 
Sustainable growth 
Business transformation and Best Value 
None of the above 
3.4 Impact on Performance and Outcomes
The setting will continue to improve its work in line with the school improvement plan and
central officers in the Education Team will continue to challenge and support the setting in
relation to developing and implementing a range of quality improvement strategies. 
3.5   Adopting a Preventative Approach
The Education (Scotland) Bill aims to take preventative action in order to close the
attainment versus deprivation gap by implementing key policies and programmes which are
designed to target support to children and young people from disadvantaged communities.
Midlothian is highly committed to closing the poverty related attainment gap. 
3.6 Involving Communities and Other Stakeholders
A link to the published report has been made available to Elected Members, parents of
children currently attending Danderhall Primary School and other interested parties. 
3.7 Ensuring Equalities
The School Improvement Plan will be screened for equalities implications. 
3.8 Supporting Sustainable Development
The School Improvement Plan allows for sustainable development and improvement. 
Page 168 of 258

Page 169

3.9 IT Issues
There are no IT implications. 
4 Recommendations 
Cabinet is asked to: 
(i) Note the content of the inspection report. 
(ii) Pass this report to the Performance, Review and Scrutiny Committee for its
consideration. 
9 May 2023
Report Contact:  Julie Fox, Quality Improvement Manager
E-mail:  julie.fox@midlothian.gov.uk 
Background Papers: 
Inspection Report (attached). 
Page 169 of 258

Page 170

Page 170 of 258

Page 171

1   |   Sacred Heart Primary School and Nursery Class, Midlothian Council, 5545323 © Crown Copyright
9 May 2023
Dear Parent/Carer 
In February 2023, a team of inspectors from Education Scotland visited Sacred Heart
Primary School and Nursery Class. During our visit, we talked to parents/carers and children
and worked closely with the headteacher and staff.   
The inspection team found the following strengths in the school’s work.
• Steps taken by the acting headteacher to refocus the work of the school on raising
attainment and improving learning and teaching. 
• Children who behave well and are pleasant, articulate and keen to learn. They respond
well to the Sacred Heart awards at assembly. 
• The nurturing approach of practitioners in the nursery. The nursery team support children
to feel secure, confident and increasingly independent in their learning. 
The following areas for improvement were identified and discussed with the headteacher and
a representative from Midlothian Council.
• Staff should work together to ensure all children experience high quality learning and
teaching. In doing so, staff should improve the planning of learning, teaching and
assessment and ensure all children receive their entitlement to a broad curriculum. 
• Teachers should continue to work together to raise attainment. They should increase their
understanding of national expectations about what children can achieve across all areas
of the curriculum.
• Staff should improve approaches to how they monitor children’s progress in learning.
They should use information on children’s progress more effectively to raise attainment
and improve how children’s needs are met across the school and nursery. 
• Staff should improve the quality of learning through play across the early level. 
Item 5.11
Page 171 of 258

Page 172

2   |   Sacred Heart Primary School and Nursery Class, Midlothian Council, 5545323 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition) and How good is our early learning and childcare?.
Quality indicators help schools, local authorities and inspectors to judge what is working well
and what needs to be improved. Following the inspection of each school, the Scottish
Government gathers details of our evaluations to keep track of how well Scottish schools are
doing. 
Here are Education Scotland’s evaluations for Sacred Heart Primary
School and Nursery Class 
Quality indicators for the primary stages Evaluation
Leadership of change  weak
Learning, teaching and assessment weak
Ensuring wellbeing, equality and inclusion weak
Raising attainment and achievement weak
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
Quality indicators for the nursery class Evaluation
Leadership of change  satisfactory
Learning, teaching and assessment satisfactory
Ensuring wellbeing, equality and inclusion satisfactory
Securing children’s progress satisfactory
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at: Reports page | Inspection reports | Education Scotland
Page 172 of 258

Page 173

3   |   Sacred Heart Primary School and Nursery Class, Midlothian Council, 5545323 © Crown Copyright
What happens next? 
As a result of our inspection findings we think that the school needs additional support and
more time to make necessary improvements. We will liaise with Midlothian Council regarding
the school’s capacity to improve. We will return to carry out a further inspection of the school
within one year of the publication of this letter. We will discuss with Midlothian Council the
details of this inspection. When we return to inspect the school we will write to you as
parents/carers informing you of the progress the school has made. 
Sadie Cushley
HM Inspector 
Page 173 of 258

Page 174

Page 174 of 258

Page 175

Cabinet
Tuesday 30 May 2023 
Protective Services, Environmental Health Food Service Plan 2023/24 
Report by Chief Officer- Place 
Report for Approval 
1 Recommendations 
It is recommended that Cabinet: 
i) note the Review of Performance of the Environmental Health
Food Service for period 2022/23
ii) note the likely impact of the current staffing position regards the
inability to successfully recruit due the national shortage of
EHOs,
iii) note the proposal by Food Standards Scotland for work towards a
new model of food law delivery in Scotland, namely ‘Scottish
Authorities Food Enforcement Rebuild’ (SAFER) and  agreement
by  SoLACE  and Midlothian Council Corporate Management Team
to endorse the participation of Environmental Health colleagues in
this work and the related temporary relaxations that can be
introduced on a risk basis to create the capacity for this work, and
iv) approve the Environmental Health Food Service Plan 2023/24.     
2 Purpose of Report/Executive Summary 
The purpose of this report is to advise Cabinet of the obligation upon
the Council to document and implement a Food Service Plan; and to
seek approval of the Protective Services Environmental Health Food
Service Plan for 2023/24. 
Date 12 May 2023   
Report Contact: Gail McElroy 
Tel No: 0131 271 3342
gail.mcelroy@midlothian.gov.uk 
Item 5.12
Page 175 of 258

Page 176

2 
3 Background: Food Service Plan 
3.1 Food Standards Scotland (FSS) is responsible for all strategic and
policy aspects of food standards, food safety and feed safety in
Scotland. 
The Food Standards Agency (FSA) Framework Agreement on Official
Feed and Food Controls provides Food Standards Scotland with a
mechanism for implementing its powers under the Food Standards Act
to influence and oversee local authority enforcement activity.  It also  
defines a Local Authority’s responsibilities in delivering the food
enforcement service. 
3.2 The Framework Agreement states that the Council has a duty to
provide an up to date food service plan and stipulates that “To help to
ensure local transparency and accountability, and to show their
contribution to the authority’s corporate plan, feed and food service
plans and performance reviews should be approved at the relevant
level established for that local authority, whether that is Member,
Member forum, or suitably delegated senior officer level.” 
Food Standards Scotland and Local Authorities seek to work in
partnership to discharge their duties and to incorporate 
• Food Standards Scotland’s Regulatory Strategy, and 
• The Scottish Government’s approach to Better Regulation as set out
in the Scottish Regulators’ Strategic Code of Practice. 
3.3 Food Service Plan 2023/24  
The consistent application of controls by Local Authorities is essential
in terms of the wellbeing of consumers, food businesses and the wider
economy. The Code underpins the necessary confidence of consumers
and food businesses that all food purchased or traded in Scotland is
manufactured, described and handled to consistent standards,
irrespective of its origin. 
The obligations that apply to the delivery of official controls by local
authorities includes ensuring: 
a. the effectiveness and appropriateness of Official Controls. 
b. that controls are applied at an appropriate risk-based frequency. 
c. that they have a sufficient number of suitably qualified and
experienced competent staff and adequate facilities and equipment to
carry out their duties properly. 
d. that staff are free from conflicts of interest. 
e. that they have access to an adequate laboratory capacity and
capability for testing. 
Local Authorities are required to have approved Service Plans that set
out how and at what level food controls will be provided, in accordance
Page 176 of 258

Page 177

3 
with the Framework Agreement on Official Feed and Food Controls and
the Interventions Food Law Code of Practice (Scotland) 2019. 
The Food Service Plan 2022/23 details how these obligations are being
met and pursued within Midlothian. 
The draft Food Service Plan 2023/24 is attached at Appendix A. 
3.4  Scottish Authorities Food Enforcement Rebuild (SAFER) 
In compliance with the Food Law Code of Practice Midlothian Council
Food Service will prioritise central government initiatives, based on risk
assessment and where resources allow.
With the pressures facing Scottish Food Authorities, FSS has
proposed, Scottish Authorities Food Enforcement Rebuild (SAFER), a
collaborative approach to implement a new model of Food Law delivery
in Scotland. This will be a comprehensive overhaul of the way in which
the Food Service operates.
It has been intimated that work will begin in Q3/Q4 of 2023 and will be
a significant project, involving considerable officer time.  Given the
scale of the work proposed, when this project is initiated, it is
anticipated that the Food Service will be unable to complete the
2023/24  Food Service Plan in its entirety. A temporary relaxation of the
current food enforcement regime will be required.  To ensure the safety
of food provided in Midlothian, the Food Service will continue to
prioritise planned interventions of the highest risk food businesses;
approved premises, priority 1 and 2 category premises and serious
food related incidents.  
Although the work to develop and later deliver SAFER will pose a short
term reduction in food law enforcement in lower risk premises, it will
ensure a more robust long term solution designed to protect individuals
and communities in Midlothian which will enable them to lead healthier
and safer lives.  
A recent meeting of SoLACE  agreed to endorse the participation of
Environmental Health colleagues across Scotland in this work and the
related temporary relaxations that can be introduced on a risk basis to
create the capacity for this work. The matter has also been considered
and is supported by Midlothian Council Corporate Management Team 
FSS have advised that the main focus of the performance and
monitoring audit for this year will be to verify and validate the
implementation of any specific direction given by FSS. 
3.5  Review of the previous plan 
Section 6 of the Framework Agreement states that The Food Authority
should review and set out information on the previous year’s
performance against that service plan. 
The Review of Service performance against the 2022/ 2023 Food
Service Plan is attached at Appendix B. 
Page 177 of 258

Page 178

4 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
This is detailed within the Service Plan 2023/24 
4.2 Digital 
There are no digital implications identified at this time. 
4.3 Risk 
Section 1 of the Food Law Code of Practice (Scotland) requires the
statutory obligations be brought to the attention of local authority
officials and / or elected member bodies responsible for
agreeing budgets or other service arrangements relevant to the
delivery of official controls. 
Environmental Health is a statutory function and the Food Service Plan
is produced in pursuance of this function. Failure to produce and
implement a food service plan leaves the local authority open to both
the challenge of failing in its statutory duty and increased reputational
risk. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
There are no known equality issues arising from the provisions of this
annual plan. 
4.4 Additional Report Implications (See Appendix C) 
See Appendix C 
Appendices 
Appendix A – Food Service Plan 2023/24 
Appendix B – Review of service performance against the 2022/ 2023  
Food Service Plan
Appendix C  - Additional Report Implications
Appendix D  - Background information/Links 
Page 178 of 258

Page 179

5 
APPENDIX C – Report Implications 
C.1 Key Priorities within the Single Midlothian Plan 
In terms of the key priorities of Midlothian Council the delivery of the
food enforcement role as detailed in the Food Service Plan 2023/24
significantly contributes to reducing the gap in health outcomes. This is
achieved by ensuring the safety of food and reducing the gap in
economic circumstances by ensuring consistent and appropriate
enforcement on all aspects of the industry engaged with.   
C.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
C.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
C.4 Delivering Best Value 
This report relates to the delivery of statutory obligations. 
C.5 Involving Communities and Other Stakeholders 
The Midlothian Council Food Service Plan is a requirement produced in
accordance with Food Standards Scotland guidance to ensure delivery
of the Council’s statutory obligations. 
Page 179 of 258

Page 180

6 
APPENDIX D 
Background Papers/Resource Links 
Food Standards Agency Framework Agreement on Official Feed and Food
Controls by Local Authorities 
Interventions Food Law Code of Practice (Scotland) 2019 | Food
Standards Scotland
Page 180 of 258

Page 181

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 1 of 28 
Food Service Plan 2023-2024 
Summary 
Food Standards Scotland (FSS) require each local Food Authority to produce a
periodic plan showing how it will meet the duty of the Authority to regulate and
enforce food law in its area. This plan is produced following the Framework
Agreement on Official Feed and Food Controls by Local Authorities, issued by
Food Standards Agency (FSA). 
The coronavirus pandemic caused the cessation of almost all routine on-site food
inspection work from March 2020. This Food Service Plan is a continuation of the
restart of the Food Law Intervention Programme, which began in April 2022. 
This plan covers the Protective Services, Business Regulation Team’s food
related activities, planned from April 2023 – March 2024. It has been prepared
using risk rating data held for each food premises on our Management
Information System and following the Local Authority Recovery Process
Guidance produced by Food Standards Scotland and Scottish Food Enforcement
Liaison Committee (SFELC). 
With 982 registered food premises within Midlothian, the Business Regulation
Food and Safety Team will require to carry out around 300 inspections each year
for the next 3 years to stay on target and meet the expectations of Food
Standards Scotland. Within this Food Service Plan, between April 2023 to March
2024, 355 registered food businesses would receive a food law intervention. 
In addition, Midlothian has 11 approved food manufacturers that require
significant staff resource to ensure we meet the required standards through a
new method of Official Control Verification. As these businesses are seen as our
highest risk, the Business Regulation Food and Safety Team will be focusing on
delivering these official controls. 
However, Midlothian Council Food Service has committed to fully engaging with
Food Standards Scotland’s SAFER project to develop a new approach to food law
delivery in Scotland that is fit for the future. Until we receive guidance about this
project the Food Service must continue with their planned food law intervention
programme. When the SAFER project is initiated, the Food Service will be unable
to complete this Food Service Plan in its’ entirety.   
Using the FSS Local Authority Resource Calculation Guidance, dated August
2022, it is estimated that 3.7 FTE qualified food officers would be required to
deliver the full range of food law-related activities for this year. The Food Service
currently has 2.9 FTE for food activities. 
As at 1 April 2023 the team has a 1 FTE vacancy.  There is also currently 1 FTE on
maternity leave, planning to return January 2024, this post is covered by an
agency EHO who will cease at the end August 2023. If we manage to fill the
vacant post as hoped, in September 2023, we will still have a 1 FTE vacancy until
January 2024 due to maternity leave. 
Item 5.12
Page 181 of 258

Page 182

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 2 of 28 
Even at full complement with all posts filled, the Business Regulation, Food and
Safety Team will have a 0.5 FTE shortfall between the calculated FTE required and
the establishment FTE. This shortfall will mean the Service is highly unlikely to
fulfil all our statutory duties. 
Through this period of uncertainty, with ongoing staff vacancies and our
commitment to the SAFER project, the Food Service will continue to prioritise our
highest risk premises. All planned official controls at our approved premises will
be prioritised. All Group 1, Group 2 Band D & E and Group 3 Band D & E food
businesses will be inspected within the required timescales. Requests for service
that are deemed to be significant/serious will be investigated. 
Introduction 
Retained EU law sets out the obligations that apply to the delivery of Official Food
Controls by Local Authorities (also known as Food Authorities), ensuring: 
- The effectiveness and appropriateness of Official Controls,
- That controls are applied at appropriate risk-based frequency,
- That they have a sufficient number of suitable qualified and experienced,
competent staff and adequate facilities and equipment to carry out their duties
properly,
- That staff are free from conflicts of interest. 
Local Authorities must have regard to Codes of Practice issued by Ministers on the
execution and enforcement of the applicable food laws; and regulations and orders
made under it. Food Standards Scotland oversees that Local Authorities have in place
arrangements for the delivery of the required Official Food Controls. This Service Plan is
also developed in line with the draft Administration and Service Planning, Food Law
Code Practice (Scotland) 2020, provided by FSS. 
The coronavirus pandemic caused all planned food law intervention work to cease on
20 March 2020 when the Council moved into Category 1 responder mode.
Environmental Health Officers (EHO’s) were classed as key workers and ceased normal
duties to concentrate work on public health control measures.   
The requirements of the Health Protection (Coronavirus)(Restrictions)(Scotland)
Regulations 2020, which were regulated by local authorities, have been removed.
Officers are no longer dealing with COVID-19 related requests. However, Food Service
EHO’s would be expected to provide assistance again if needed.  It is not possible to
predict if and when that may happen. 
Food Service Officers resumed unannounced inspections, in accordance with the
Interventions Food Law Code of Practice (Scotland), in April 2022. Since then the Food
Service Plans have been prepared following the ‘Local Authority Recovery Project,
Recovery Process Guidance’ developed by Food Standards Scotland and Scottish
Food Enforcement Liaison Committee, issued in December 2020. 
Page 182 of 258

Page 183

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 3 of 28 
This guidance set maximum time periods, within which every food business must have
a planned intervention. Between April 2022 and March 2026, all food premises in
Midlothian have been allocated a scheduled intervention. If the Food Service can stay
on track with the proposed restart programme, based on our reset date of April 2022,
then all Midlothian food businesses will have had a food law intervention by the end of
March 2026. 
This plan covers the period from 1 April 2023 to 31 March 2024.   
1.1  Service Aims and Objectives 
The aims of the Food Service, delivered by the Business Regulation Team within
Protective Services, are to: 
- To protect public health by ensuring that food produced and/or consumed in
Midlothian, is safe to eat and is described accurately to the consumer, 
- Carry out the statutory duties required of Midlothian Council as a Food Authority. 
Objectives, to; 
- Complete the food law interventions programme planned for April 2023- March
2024, 
- Carry out approved premises interventions following the Official Control
Verification (OCV) framework, 
- Undertake a programme of food sampling from manufacturing premises in
Midlothian, 
- Contribute to national sampling surveys set by Food Standards Scotland, 
- Investigation food related requests for service, 
- Investigate instances of food and water borne diseases within Midlothian in a co-
ordinated approach with the relevant Health Authorities. 
- Respond appropriately to relevant food alerts as required by Food Standards
Scotland, 
- Ensure all Authorised Officers receive a minimum of 10 hours food related
training to maintain competency. 
1.2 Link to corporate objectives and plans 
Midlothian Council has developed a Single Midlothian Plan with a stated vision that;  
Page 183 of 258

Page 184

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 4 of 28 
• Individuals and communities in Midlothian will be able to lead healthier, safer,
greener and successful lives by 2030. 
• No child or household need live in poverty. 
• Midlothian will be a Great Green Place to Grow by achieving our net zero carbon
ambitions. 
Annex 1 shows the mapping of Food Service activity to the Single Midlothian Plan
outcomes. 
Food Authorities have a duty under the Regulatory Reform (Scotland) Act 2014 to
contribute to sustainable economic growth. Food Service Officers have regard to the
principles of Better Regulation helping businesses to comply and grow sustainably,
outlined in the Scottish Regulators’ Strategic Code of Practice. This is in line with the
Single Midlothian Plan. However, exceptions are in place where this would be
inconsistent with the execution of their function to protect public health. 
2.  Background 
2.1 Profile of Local Authority 
Midlothian Council is located to the south of Scotland’s capital city Edinburgh and
serves a growing population of about 93,150. Midlothian is now pro rata, the fastest
expanding area of Scotland for population growth and housing development, with a
projected population increase to 103,945 by 2028, an increase of 13.8%. This is
compared to 1.8% increase for Scotland as a whole. This brings with it consequent
pressures on council services. 
Reference: National Records of Scotland -Midlothian Council Area Profile (nrscotland.gov.uk) 
The Council is one of the smallest in Scotland covering a geographical area of 354km2.
It shares its borders with East Lothian, City of Edinburgh and Scottish Borders. The
main centres of population are currently around Dalkeith, Bonnyrigg and Penicuik with
much of the area rural in nature with small towns and villages. 
2.2 Organisational Structure 
An organisational review of Protective Services was completed in 2022.  The new
organisational structure is seen in Figure 1 and shows the current full time equivalent
(FTE) within the Business Regulation Team, as at 1 April 2023. 
The Senior Manager Protective Services has been in post since October 2021. The post
of Team Manager Business Regulation was created with responsibility for regulatory
compliance within Midlothian. From April 2023 this incorporates the Food and Safety
Team and Trading Standards Team. The appointed person started in March 2022 and
has taken on the role of Lead Food Officer for Midlothian Council.  A Principal Officer
supports the Team Manager and Enforcement Officers.  The Principal Officer within
Food and Safety has been in post since March 2023. The Business Regulation Team
has allocated Business Support, 0.4 FTE is dedicated to food related administration. 
Page 184 of 258

Page 185

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 5 of 28 
Senior Manager
Protective Services
Team Manager
Public Health &
Environmental Protection
Team Manager
Business Regulation
FTE 1
Environmental
Health Officer
FTE 1
Environmental
Warden
Food and Safety Team Public Health & Environmental ProtectionTeam
Environmental
Health Officer
FTE 1
Environmental
Health Officer 
FTE 1
Environmental
Health Officer
Environmental
Health Officer
Environmental
Health Officer
(VACANT)
Environmental
Warden
Senior Enforcement
Officer
Senior Enforcement
Officer
Trading Standards Team 
Protective Services Organisational Structure
Business Services
2.8 FTE
April 2023
Lead Officer Food
Environmental
Health Officer
Environmental
Health Officer
1 FTE
( VACANT )
Chief Officer
Place
Executive Director
PlaceChief Executive
Principal Environmental
Health Officer
FTE 1
Principal Environmental
Health Officer
(VACANT)
Principal Trading
Standards Officer
FTE 1
Business Services Manager 
Team Manager
Health, Safety & Resilience
Business Support
Figure 1. Organisational Structure of Place with current Business Regulation Team Full Time Equivalent
(FTE) as at April 2023. 
2.3 Scope of the Food Service 
The Food Service is delivered by the Business Regulation Team of the Environmental
Health Service, part of Protective Services in the Place Directorate. The Service is
based at Fairfield House, 8 Lothian Road, Dalkeith, EH22 3AA - Tel. 0131 271 3559,
email: foodandsafety@midlothian.gov.uk. 
The Service generally operates during Midlothian Council office hours, 9-5pm Monday
to Thursday and 9-3.45pm Friday.   However, a certain amount of inspection and
reactive work is done out with these hours in order to access businesses that open in
the early mornings, evenings or at weekends or to respond to public health concerns. 
Outwith core hours, contact for emergency purposes is on an ad-hoc “whom-failing”
basis via the Midlothian Contact Centre - Telephone number 0131 663 7211. 
The organisational structure, lines of responsibility and establishment of the
Environmental Health Service are shown in Figure 1 above. 
The range of food activities involved in regulating businesses in Midlothian include; 
• Regular interventions with food business to check compliance with food law
including safety, hygiene, food composition and labelling.
• Approval of our highest risk businesses handling products of animal origin.
Page 185 of 258

Page 186

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 6 of 28 
• Licensing of certain premises i.e. mobile street traders
• Sampling of food to check on hygiene, composition and labelling. 
• Investigation of complaints from the public about food, food labelling and food
premises. 
• Investigation of food related cases of infectious diseases.
• Detection and investigation of food related fraud and food crime. 
• Enforcement of the legislation in relation to the above activities. 
• Providing advice and assistance to new or existing food business operators
and to the public. 
• Scrutiny of planning and building warrant applications relating to matters of
food safety 
The Food and Safety team is also responsible for;  
• Enforcement of Health and Safety legislation in many workplaces in the
Midlothian area, including the investigation of workplace accidents and incidents
in those premises, 
• Environmental Health Officers contribute to the Council’s Safety Advisory Group
providing advice to event organisers, 
• Enforcement of the Public Health (Scotland) Act and in partnership with NHS
Lothian, the investigation and control of certain infectious diseases and other
public health concerns, 
• Licensing and regulation of residential caravan sites, certain activities covered by
Civic Government licencing and zoos. 
Enforcement Officers are authorised by the Council to enter premises, inspect and take
samples, serve legal notices and make reports to the Procurator Fiscal. Any formal
action taken is in line with our Food Enforcement Policy. 
City of Edinburgh, Scientific Services are appointed by Midlothian Council to provide
services of examination and analysis of samples. 
2.4 Demands on Food Service 
Service User Profile 
As of 1 April 2023, 982 food business were registered and operating in Midlothian. 
From 2005 – 2023 there had been a net year on year rise in food businesses, see figure
2. The rate of increase has slowed since the pandemic. Within the year from April 2022
to March 2023, 112 food businesses ceased trading and 77 new food businesses
registered. 
Page 186 of 258

Page 187

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 7 of 28 
Figure 2 Number of food businesses registered with Midlothian Council from 2005 – 2023 
The majority of the food premises in the area are small to medium enterprises. Most of
these businesses rely on regular contact from the Business Regulation Team for advice
and guidance on the legal requirements for food and safety. 
There are 11 premises located in the area approved for the manufacture and supply of
high risk products of animal origin to other food businesses and potentially national and
international markets.  A small number of food businesses export to non-EU countries. 
Changes to Enforcement Practice 
The Interventions Food Law Code on Practice (Scotland) introduced the new Food Law
Rating System (FLRS) in April 2019 and changed the way in which food businesses are
risk rated after an inspection. The risk rating of each food business will still determine
the frequency at which it is inspected. However, all food businesses are now assessed
on a wider range of aspects of food law covering hygiene, composition, labelling
requirements and the risk of fraud. This new risk assessment scheme is expected to
result in increased frequency of inspections for the higher risk businesses. Businesses
deemed to be of the highest risk at their programmed inspection, due to serious non-
compliance, will receive intensive interventions, with further full inspections within 1
month and 3 months. 
FSS Local Authority Recovery Process Guidance sets out 6 risk-based priorities from
highest to lowest risk (see Annex 2).  The Food Service will monitor and report on the
highest risk of these, i.e. Priority 1 and Priority 2 at the end of the 12 month plan. The
Food Service will also monitor the progress, quarterly by the cumulative percentage of
planned food premises inspections achieved in each month, for all priority categories. 
500
600
700
800
900
1000
1100
1200
2005 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Number of premises
Year
Number of food premises
at 31st March 2005 - 2023
Page 187 of 258

Page 188

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 8 of 28 
These changes have required updates to the Management Information System used by
the Food Service (UNIform - IDOX) to cope with this and there will be a transitional
period as food businesses are moved from one assessment regime to another.  It is
anticipated that all food businesses will be risk rated under the new FLRS system within
48 months of restarting the Food Law Intervention Programme. 
The Interventions Code does not apply to food establishments at the level of Primary
Production or Approval. The way in which Official Controls are applied to approved
premises has changed with more frequent, in depth interventions now required. Each
premises will require numerous visits within an annual cycle. A significant amount of
officer time is needed to continue the implementation of this new process, with 2 officers
required for each of these interventions. At present there are 11 approved premises
within Midlothian, with a further business requiring assessment. 
Future Demands 
Regulation of businesses is regularly changing and with it the demands on ensuring
compliance. Midlothian Council Food Service will prioritise any national or local driven
outcomes, including compliance with new legislation or improved compliance with
existing legislation. The acceptance of this will be risk based and will take account of
any additional burden and/or additional resource required. 
A consultation on the provision of mandatory calorie information within the ‘out-of-home’
sector is ongoing. This is being considered to help reduce diet-related health
inequalities. As Food Service Officers are already visiting food premises on a regular
basis and enforcing existing food law they are seen by Scottish Government as best
placed to provide support and guidance to business to fulfil this requirement.  This will
need further time resource to ensure officers are trained and competent before then
spending time with businesses to help them apply any new legislation. 
A pilot of whole systems approach to Type II diabetes prevention in Mayfield and
Easthouses is planned to begin in 2023.  This aims to improve access to healthy food. 
It is planned for Food Officers to engage with targeted food businesses to promote the
use of Menucal, an online tool to help reduce the number of calories offered in ‘out-of-
home’ foods. 
Central Government Initiatives 
Midlothian Council Food Service will prioritise central government initiatives in
compliance with the Food Law Code of Practice, based on risk assessment and where
resources allow. 
With the pressures facing Scottish Food Authorities, FSS has proposed SAFER,
Scottish Authorities Food Enforcement Rebuild, a collaborative approach to implement
a new model of Food Law delivery in Scotland. This will be a comprehensive overhaul
of the way in which the Food Service operates. 
Midlothian Council Food Service will participate in central government initiatives
proposed by Food Standards Scotland in regard to SAFER.  
Page 188 of 258

Page 189

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 9 of 28 
It has been intimated that this work will begin in Q3/Q4 of 2023 and will be a significant
project, involving considerable officer time.  Given the scale of the work proposed, when
this project is initiated, it is anticipated that the Food Service will be unable to complete
this Food Service Plan in its entirety. A temporary relaxation of the current food
enforcement regime will be required.  To ensure the safety of food provided in
Midlothian, the Food Service will continue to prioritise planned interventions of the
highest risk food businesses; approved premises, priority 1 and 2 category premises
and serious food related incidents.   
Although this work will pose a short term reduction in food law enforcement in lower risk
premises and cases, it will ensure a more robust long term solution designed to protect
individuals and communities in Midlothian which will enable them to lead healthier and
safer lives.   
FSS have advised that the main focus of the performance and monitoring audit for this
year will be to verify and validate the implementation of any specific direction given by
FSS. 
There was agreement at the meeting of SoLACE on 16 December 2022 to endorse the
participation of Environmental Health colleagues in this work and the related temporary
relaxations that can be introduced on a risk basis to create the capacity for this work. 
2.5  Enforcement Policy 
The Authority has a documented Food Enforcement Policy which was approved by
Council on 8 March 2022.  It will be due to be reviewed in April 2024. This sets out how
the Food Service will deal with non-compliance with food law and how we intervene to
bring businesses back into compliance. Authorised Officers make enforcement
decisions in line with Midlothian Council’s Food Enforcement Policy. 
3. Service Delivery 
3.1   Interventions at Food Business Establishments 
This plan covers the period from 1 April 2023 until 31 March 2024. 
The Food Service plans to carry out 355 interventions at Midlothian food business to
assess their compliance with food law. This includes planned interventions at premises;
risk rated under the Food Law Rating Scheme (FLRS), those classed as ‘missed’ during
the Coronavirus pandemic and newly registered food businesses. Table 1 shows the
breakdown of the number of interventions planned in each priority category. 
Planned Food Interventions April 2023 – March 2024
Priority Category Number of planned
interventions
Highest Risk Premises
Priority 1  10
Page 189 of 258

Page 190

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 10 of 28 
High Risk
Priority 2  37
Medium Risk 
Priority 3, 4 and 5 291
Lowest Risk 
Priority 6 17
Total 355 
Table 1, Breakdown of Priority Category and Number of Interventions Planned 
Priority categories are set with proposed timescales (see Annex 2) by which premises in
each category must receive an intervention. Rescheduled dates have been set, within
Midlothian Council’s Management Information System, for any premises that ‘missed’
their inspection, to ensure they receive a planned intervention within proposed
timescales. If the programme remains on track and the current vacancy filled to provide
a full complement of staff all the food businesses (registered with Midlothian Council by
April 2022) are scheduled to have had a food law intervention by end March 2026. 
Prior to the Coronavirus pandemic the Food Service had good quality, up to date risk
ratings for the majority of the food businesses in Midlothian. 
In the second year of the restart, from 1 April 2023 - 31 March 2024, the Food Service
will again prioritise the known highest risk food businesses that operate within
Midlothian. This includes priority 1 and priority 2 category businesses. 
At 01 April 2023 there are 47 of these businesses in these categories that will receive a
planned intervention in 2023/24. 
It is anticipated that the number of unplanned interventions will increase throughout this
year due to the identification of serious non-compliances, as evidenced in year 2022 –
2023.  These non-compliant businesses will thereafter need to receive ‘intensive’
interventions at specified intervals, namely within 1 month of the initial inspection
followed by another full inspection after 3 months. The worst, highest risk premises will
have an additional intervention after another 6 months. It is impossible to predict at
present how many premises this may relate to. In year 1 the number of food businesses
with serious failures doubled from that originally planned, thought to be due to a decline
in standards as a result of the legacy of the pandemic coupled with the increased cost
of living. 
Priority 3, 4 and 5 category businesses have been allocated an intervention date within
the proposed time periods set out in the FSS recovery guidance. These are spread
evenly throughout 12, 18, 24, 36 and 48 months in line with the guidance.  Within the
current years plan, 291 medium risk premises (priority 3, 4 and 5) would receive an
intervention. 
Priority 6 category businesses are the lowest risk, they include small retailers selling
pre-packed foods and childminders and home caterers preparing and selling low-risk
Page 190 of 258

Page 191

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 11 of 28 
ambient foods. If resources allow and staff levels increase, due to a successful
recruitment campaign, interventions at these lowest risk businesses would be initiated. 
As previously shown, the number of new food businesses registering with Midlothian
Council is increasing year on year. All newly registered food businesses require a full
inspection to allow them to be risk rated under the new system. The Food Service plan
allocates resource to inspect 20 higher risk (Group 1 & 2) and 25 lower risk (Group 3)
businesses within the year. Depending on the type of food business, officer resource to
bring them in line with regulatory compliance can be significant. In the last 6 months
Food Officers have been supporting new manufacturing establishments, an application
for a new approved premises and food producers using complex processes. 
Approved premises who supply products of animal origin are classified as Midlothian
Council’s highest risk food establishments. Year 2023 – 2024 will see Midlothian Food
Service implement phase 2 of the OCV process.  This will include detailed review of
businesses documented procedures and the introduction of reality check inspections
and focused audits. The Food Service will prioritise these planned interventions over
other planned work. 
All approved premises will receive interventions in line with the Official Control
Verification (OCV) Guidance, produced by FSS. This is a methodical approach of
auditing the highest risk food businesses to secure high level public health protection
and protects the reputation of Scottish food businesses. Implementation of this new
process significantly increases the time spent on Official Controls at approved
establishments. Utilising the FSS provided resource calculator it has been estimated
that 92 days of officer’s time will need to be allocated to these 11 premises, this year
alone. Midlothian Food Service will move to phase 3 of the process in 2024-2025. 
The organisational structure of Business Regulation provides 5.5 FTE officer positions
within the Food and Safety team, including management. Currently 4.5 FTE positions
are filled within this team and there is 1 FTE vacancy. For the team to fulfill all the food
law requirements placed upon them within this current year’s plan they would require an
(estimated) additional 0.8 FTE.  This would be covered by recruitment into the vacant
post. 
Mindful of the national shortage of Environmental Health Officers Midlothian Council
Environmental Health have adopted “a grow our own” approach and are currently
supporting a Student EHO through their professional training.  It is anticipated that they
will complete their training and sit the REHIS Professional Diploma, to qualify as an
EHO, in September 2023.  Post professional qualification a period of work experience is
required before any new officer can be fully authorised. 
3.2 Food Complaints and Requests for Service 
A proportion of the Service’s work relates to dealing with requests for service about food
related matters. The team receives approximately 450 service requests each year, of
which about 50% are food related. 
Page 191 of 258

Page 192

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 12 of 28 
Food service requests include; 
• Complaints about food that people have bought or consumed e.g. foreign
bodies in food or alleged food poisoning,
• Complaints about food premises which appear to be being run unhygienically,
• Requests for advice about starting food businesses, legal requirements, food
hygiene training, labelling or the layout and fittings of proposed premises, 
• Applications for Certificates of Compliance and Licensing of mobile food
street traders, 
• Scrutinising planning applications and building warrants received by the
Council relating to food premises and offering advice to applicants regarding
premises layout, fittings  etc.,
• Investigating cases and outbreaks of infectious disease, in partnership with
NHS Lothian, associated with the consumption of food or water,
• Responding to intelligence concerning food incidents or food fraud from Food
Standards Scotland and other local authorities, instigating food alerts for
action, product recalls and allergy alerts. 
All service requests, where we have a statutory function, must receive a response to
determine the extent to which further action is needed. Therefore, this work must take
priority over planned inspection work. 
Response times are specified for some reactive work.  For requests of service received
Authorised Officers should make first contact within 5 working days. It has been agreed
with NHS Lothian that cases of gastrointestinal infection should be contacted within 2
days of notification, more serious cases of typhoid/paratyphoid, E.coli O157/STEC,
Cholera 01, Shigella Dysenteries, Listeria, Legionella and Non-Sonnei Shigellas should
be contacted on the day of notification. Mandatory health and safety investigations take
priority and would be initiated on the day of notification. This would include fatalities or
multiple serious injuries in a workplace. 
Some requests may result in significant amounts of work being required to resolve
them. For example, a complaint about an unhygienic premises which leads to
enforcement action and a subsequent report to the Crown Office Procurator Fiscal
Service (COPFS) ; a new food manufacturer requiring significant research into the
processes involved; a fatal or serious workplace accident; a major infection control or
public health incident. 
3.3  Home Authority 
Midlothian Council has agreed to act as Home Authority to a large food manufacturer
with the Head Office and decision making base in Bonnyrigg and as such expects to
receive communication from Local Authorities.  
Where Home Authority agreements exist with other UK local authorities the Food
Service will liaise with those authorities where appropriate in investigation food safety or
food standards matters. 
Page 192 of 258

Page 193

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 13 of 28 
3.4  Advice to Businesses
The Food Service provides advice freely to Midlothian businesses. Advice and guidance
is given during routine food law interventions and in response to service requests from
food businesses.
Where new legislation and associated guidance has been produced, the Food Service
may plan a targeted intervention to advise affected businesses. For example, In
October 2021 changes were introduced to the labelling requirements of food pre-packed
for direct sale – that is packed on the premises for sale to walk in customers.  This
followed a number of deaths across the country involving allergic reactions to food
constituents and high profile coverage in the UK media. This is a significant change for
businesses such as takeaways and sandwich shops. A targeted email was sent out to
371 businesses in Midlothian that would be affected by this change. Social media posts
were sent out on the Midlothian Council twitter feed and the Midlothian Council website
was updated to include these changes. 
3.5 Food Sampling 
The sampling of food is an integral part of the work of the Food Service. The sampling
plan can cover local outlets, approved premises, manufacturers and also nationally
organised campaigns. Unplanned food samples are taken for investigatory purposes
often relating to food complaints from members of the public. On average 235 food
samples are taken each year for examination or analysis. 
Food sample examination involves assessing the microbiology of both ingredients and
final products. It can give an indication of the conditions under which it is produced and
the levels of hygiene controls during processing and handling both in the environment of
the premises and the practices of the people producing it. 
Food sample analysis can determine; what a food is made of, whether the ingredients
meet legal requirements e.g. % meat or fruit, if foodstuffs are contaminated or
adulterated and if labelled or described accurately. 
Food samples are submitted to Edinburgh Scientific Services who employ the
Authority’s appointed Food Examiner, Public Analyst and Agricultural Analyst. The Food
Service does not have a dedicated Food Sampling Officer. Authorised Officers from the
Business Regulation team take samples from approved premises, see table 2, and
manufacturers during food law interventions and purchase samples as part of the
national survey. 
Annual Sampling from Approved Premises
Food Sampled  Samples for
Microbiological
Examination
Samples for
Analysis 
Processed Milk  8 8
Cream  2 2
Meat Products  6 6
Pizzas and Ready Made Meals  6 6
Page 193 of 258

Page 194

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 14 of 28 
Table 2 – Annual Sampling Plan for Approved Premises in Midlothian 
The Food Service participates in sampling surveys organised by Food Standards
Scotland, Lothian and Borders Food Liaison Group and the Scottish Food Enforcement
Liaison Committee (SFELC).   
These sampling programmes and priorities aim to identify trends in the food supply
where intelligence data suggests more information is required or a problem may already
exist.  Sampling is carried out by Local Authority Authorised Officers across Scotland
and the results collated centrally. This work is resourced by FSS and is coordinated by
SFELC in collaboration with the Public Analyst. The Food Service is awaiting the FSS
funded Local Authority National Sampling Programme for 2023 – 2024. An example
sampling survey for Midlothian Council can be seen in Annex 3. 
3.6 Control and Investigation of Outbreaks and Food Related Infectious Disease 
Authorised Officers of the Business Regulation Team investigate cases of infectious
gastrointestinal illness. The policy is agreed between NHS Lothian Health Protection
Team (HPT) and Environmental Health services of the local authorities, City of
Edinburgh Council, West Lothian, East Lothian and Midlothian Councils. The standard
procedures for the investigation and management of sporadic cases and incidents of
gastrointestinal infection are set out in the ‘Sporadic GI Policy’, updated December
2022. 
On average Midlothian Food Service receive approximately 22 reported cases of
infectious disease per year. 
The Service has an agreed ‘Major Outbreak Plan for Lothian’ with NHS Lothian which
confirms agreed procedures for the investigation and control of disease outbreak
situations. The Joint Health Protection Plan for the Lothian area has been developed
with multiple agencies and is an important document which acts as a reference point for
assisting in the investigation and control of public health outbreaks and incidents.
Authorised Officers work with the Director of Public Health and Consultants in Public
Health Medicine to determine control measures to manage the outbreak. 
3.7 Food Law Incidents 
Food incidents are events where there are concerns about actual or suspected threats
to safety, quality or integrity of food that could require intervention to protect consumers’
interests.  They are dealt with in accordance with the procedures detailed in the Food
Law Code of Practice (Scotland).  
The Food Service acts in partnership with FSS during food incidents. Responding to
‘Food Alerts for Action’ where food, produced and distributed regionally or nationally,
Haggis/Savoury Puddings 6 6
Dairy products 4 4
Fish 2 2
Total 34 34
Page 194 of 258

Page 195

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 15 of 28 
may need to be removed from sale by businesses in Midlothian. The majority of
incidents notified to the Food Service by FSS are Food Alerts for Information, providing
details on product recalls and allergy alerts. 
3.8 Liaison with other Organisations 
The Food Service meets at quarterly intervals with representatives of other local
authority food enforcement teams at the Lothian and Borders Food Liaison Group. The
group is also attended by representatives from Food Standards Scotland and the Public
Analyst.  Local liaison groups support the work of the national Scottish Food
Enforcement Liaison Committee (SFELC). The Scottish Food Enforcement Liaison
Committee supports the work of FSS by providing information and expert advice in
relation to food law enforcement. SFELC contributes to the development and
implementation of FSS strategies and policies. It also provides a forum for the
discussion of relevant topics, sharing best practice guidance, initiating surveys or
projects. 
Regular liaison meetings also take place with NHS Lothian’s Health Protection Team
and Scottish Water on matters of public health including infection control.
(A similar liaison group arrangement exists with attendance by the Health and Safety
Executive) 
3.9 EU Exit 
Following the UK exit from the EU at the end of 2019 existing EU law relating to food
enforcement, which comprised the majority of food safety legislation, was relabelled as
“Retained EU Legislation”. At present, this continues in place with minor variations in
Scottish legislation so that there is continuity. This retained Food Law and the
obligations it places in the local authority remain matters devolved to the Scottish
Parliament. However, the Retained EU Law (Revocation and Reform) Bill introduced by
the UK Government in September 2022 is currently going through parliament and could
‘sunset’ all Retained EU Food Law by end December 2023.  The outcome of this is yet
unknown.   
Unlike other food authorities Midlothian has not been impacted by the export related
consequences of the UK becoming a “third country” in relation to the EU. 
For local authority areas which host businesses dealing in fish and fish products for
export the demand for the signing of export health certificates by Environmental Health
Officers has been considerable. 
However, it is possible that the inspection of imported food could become a requirement
where the increased requirement for regulatory food safety checks are deferred to
inland authorities rather than dealt with at the point of entry e.g. a sea or airport. This
was due to start in July 2022 but has been delayed to the end of 2023. 
3.10 Food Law promotional work, and other non-Official Controls interventions. 
Staffing levels and increased demands on the Food Service have meant that the Food
Page 195 of 258

Page 196

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 16 of 28 
Service must prioritise the statutory requirements. Much of the promotional work,
including education, awareness campaigns etc. are now limited. However, if staffing
levels improve to full complement the Food Service would look to restarting some food
safety promotional activities. 
The Health and Safety Executive (HSE) determine priority areas for Local Authorities to
target interventions that improve health, safety and welfare within workplaces. As part
of these targeted interventions the Business Regulation Team plan awareness
raising campaigns targeted at Midlothian’s highest risk businesses. Increasing
compliance in one area e.g., Health &Safety can often have a positive impact in other
areas including food safety. 
3.11 Food Crime and Fraudulent Activities 
Food Fraud is a dishonest act or omission, relating to the sale or preparation of food,
which is intended for personal gain or to cause loss to another party. Food Crime
(serious Food Fraud) is considered to be serious or complex fraud or serious and
dishonest regulatory non-compliance in relation to food, drink and animal feed. The
Scottish Food Crime and Incidents Unit (SFCIU) exists within FSS to prevent,
investigate and detect fraud and deliberate non-compliance within the food and animal
food chain. 
The Food Service cooperate with and will inform SFCIU at the earliest opportunity of
any suspicions they have regarding Food Crime or Food Fraud. There is an anticipated
increase in food crime and fraudulent activities as a result of our exit from the EU.   
4. Finance and Staffing 
4.1 Financial Allocation 
Indicative financial allocation for the Food and Safety Team within Business Regulation
for all aspects of work. The budget for the provision of scientific services includes all
sampling and services provided to the Environmental Health Service and other services
within Midlothian Council. 
Direct Staffing costs 275,673
Inspection Services equipment and maintenance costs 4163
Provision for scientific services 41,615
Transport costs 1624
Total 323,075 
4.2 Staffing Allocation 
Historically, the fulfilment of the annual food safety plan has required a minimum of 3.5
full time staff (FTE) working on food enforcement out of a team complement of six
(based on data from 2008 to 2018).  In 2018, Council financial saving requirements
Page 196 of 258

Page 197

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 17 of 28 
made of Environmental Health resulted in a 33% reduction in the number of officers in
the Food Service.  The risks that could arise from this reduction were brought to
Members attention in the reports presented in June 2018 and June 2019. 
In 2022 a reorganisation of the Service Area, to Protective Services under Place
Directorate, was agreed and initiated.  At the inception of this new service Business
Regulation, Food and Safety Team comprised of 6 FTE, including a Team Manager and
Principal Officer. At this time, 4.5 officers were in post and there was 1.5 FTE
vacancies. From April 2023 the Trading Standards Team now sits within Business
Regulation. This has effectively reduced the FTE for the Food and Safety Team to 5.5
FTE. 
It is projected that to manage and achieve the full range of food law interventions, within
this annual plan, would take 3.7 FTE Authorised Officers working on food related
matters alone. At the time of creating this plan there is a shortfall of 0.8 FTE for food
related matters. 
Due to the recent changes in the way the Food Service carries out their Official Controls
at all food establishments, the time required to fulfil these requirements will need to be
reviewed at the end of each year. A time measurement exercise is being carried out at
present, coordinated by FSS, to provide a more accurate estimate of staffing resource
needed. It is predicted that the required FTE for food activities will increase. 
In addition to conducting planned work the Business Regulation Team must maintain
capability to deal with matters which are not food safety related but require a priority
response.  The pandemic has been an extreme example. Existing staffing levels have
meant there is no “spare” capacity for such contingencies and time has to be taken from
food inspection work to deal with serious health and safety accidents, public health or
environmental incidents, preparing prosecution reports, implementing changes to legal
requirements and updating operational procedures. 
Taking account of all the requirements placed on the Business Regulation, Food and
Safety Team and the current vacancy, at present there is a shortfall of 1.5 FTE
Authorised Officers to complete the plan in its entirety. The proposed new structure only
allows for recruitment of 1 FTE EHO. 
The current vacant EHO position in the Business Regulation Team was previously
advertised but there were no suitable candidates. The Environmental Health profession
suffers from a succession crisis and recruitment of suitably qualified staff is an issue for
all local authorities in Scotland. There is a plan for another recruitment exercise with the
hope to bring the Business Regulation Team up to full complement. 
At present Midlothian Council is supporting a student EHO through their practical
training with the anticipation that they will achieve their Professional Diploma as an EHO
by September 2023. 
With a longer term view, Midlothian Council will continue to support student EHO’s
where possible. 
Page 197 of 258

Page 198

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 18 of 28 
It should also be noted that the directing of available resources to food law intervention
work has meant that health and safety interventions, arguably as important for
wellbeing, have been increasingly sacrificed. Lower risk food premises inspections may
cease altogether. No non-statutory food related activities, are carried out. 
4.3  Staff Development 
The Food Law Code of Practice requires that all Authorised Food Officers obtain at
least 10 hours of update training in food related matters during the year to maintain their
competency.  Use is made of on-line courses, many of them free through FSS. Regular
training courses are organised through Royal Environmental Health Institute for
Scotland (REHIS) and Scottish Food Safety Officers Association, for a small fee.
Research by officers in matters that are unfamiliar to them is also considered
Continuous Professional Development. 
Compliance with this matter will be achieved. 
At present the Business Regulation Team have a training budget of £1250 for 2023-
2024. 
Regular Food and Safety team meetings will be organised throughout the year 2023-
2024, on a bi-weekly basis were possible. These help to impart relevant updates and
aid consistency during discussions. 
Food Service staff are subject to the Council’s appraisal process – Making Performance
Matter. This sets and monitors individual performance targets and identifies training and
development needs.   
5 Monitoring 
5.1 Quality assessment and internal monitoring 
The Service relies on the professional skills of its authorised officers for the delivery of
the service plan. In order to maintain the quality of the work we do, we; 
• Continually review our operational procedures to improve our service delivery
and to take into account legislative and procedural changes. 
• Evaluate the consistency of our inspections through activities such as
accompanied inspections by senior inspectors, team meetings and review of
inspection reports to ensure consistency in the work of the Service. 
• Ensure that Officers appointed as food inspectors complete at least 10 hours
food related training each year as part of the maintaining of their competency.
• Are subject to periodic independent audit by Food Standards Scotland.
• Survey businesses that have been inspected to find out what they thought of
the experience. 
• Report the performance of a number of our planned objectives to elected
members at regular intervals.
Page 198 of 258

Page 199

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 19 of 28 
6 Review 
6.1 Review against the Service Plan 
The Food Service Plan will be reviewed annually. 
6.2 Areas of Improvement 
Any areas identified as requiring action will be detailed as part of the audit and review
process. These will be addressed by the Protective Services Manager and the Team
Manager Business Regulation as part of the review process and action taken shall
range from immediate action to inclusion in the Operational Plan for future years. 
Currently in 2023-2024, the Food Service plan to make the following improvements; 
- Food Service Policies and Procedures will be reviewed in line with new/updated
Codes of Practice and Guidance provided by FSS. This will be on a priority basis
based on risk. 
- With the review of procedures, potential efficiencies will be considered to reduce
Food Officers administrative burdens 
- A new procedure of recording Official Controls carried out at Approved Premises
will be implemented. 
- A new system, Enterprise for Uniform, will be set up on our Management
Information System (MIS) to help Food Officers manage their workload and
prioritise effectively. 
Page 199 of 258

Page 200

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 20 of 28 
Annex 1:  Mapping of Food Service activity to the Single Midlothian Plan outcome 
Single Plan Outcome  
Food Service
activity 
Individuals and
communities in Mid-
lothian will be able
to lead healthier,
safer, greener and
successful lives by
2030. 
No child or house-
hold need live  in
poverty 
Midlothian will be a
Great Green Place
to Grow by achiev-
ing our net zero
carbon ambitions. 
The regular
inspection of food
premises for food
hygiene and food
standards 
✓   
The sampling of
food and animal
feedstuffs to check
on microbiological
quality and
composition
✓   
Investigation of food
related cases of
infectious diseases
✓   
Investigation of food
related fraud   
✓ ✓ 
Investigation of
complaints from the
public about food,
food labelling and
food premises. 
✓   
Enforcement of the
legislation in
relation to the
above activities
✓   ✓ 
Providing advice
and assistance to
new or existing food
business operators
and to the public. 
✓ ✓  ✓ 
Page 200 of 258

Page 201

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 21 of 28 
Annex 2 - FSS Priority Category for Food Law Intervention Restart 
Annex 5 
Food Hygiene
Annex 5 
Food Standards 
FLRS Approved
Premises
Priority 1   a) All Group 1
premises follow-
ing the timescales
in the Interven-
tions Food Law
CoP, 
b) Group 2 and 3
Band Es deal with
within 1 month of
start date. 
c) Spread all
Group 1 Unrated
businesses
throughout a 6-
month period. 
LAs which have
already imple-
mented OCV –
continue/restart
the programme
and schedule
each premises
within 12-month
period. 
LAs which have
not
implemented
OCV – start the
implementation
of OCV for
Approved
Premises and
spread evenly
over 12-month
period. 
Priority 2 Category As
spread over 6
months.
Food Standards
only premises
Category As
spread over 6
months.
(a) Group 2 and 3
Band Ds spread
over a 6-month
period. 
(b) Spread all
Group 2 Unrated
businesses
throughout a 12-
month period. 
Priority 3 Category Bs
spread evenly
over 18-month
period.
Category As
spread through-
out 12 months.
(a) Group 2, Band
C over 18 months
and Group 3
Band C over 36
months. 
(b) Spread all
Group 3 Unrated
businesses
throughout a 24-
month period. 
(c) 
Priority 4 Category Cs
spread over 24
months.
Category Bs that
are Category Es
for Food Hygiene
spread over 24-
month period. 
Group 2 Band B
over 24 months
and Group 3
Band B over 48
months. 
Page 201 of 258

Page 202

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 22 of 28 
Priority 5 Category Ds
spread over 36
months
Food Standards
only Category Bs
spread over 36
months.
Group 2 Band As
over the period of
up to 48 months. 
Priority 6 Category E
premises
spread over 48
months
Food Standards
only Category Cs
spread over 60
months.
Group 3 Band As
-decide if they
need inspections,
if so, spread over
60 months or are
no proactive inter-
vention. 
Page 202 of 258

Page 203

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 23 of 28 
Annex 3 – Example of an FSS Funded Local Authority National Sampling Survey 
Priority No./
Survey Code
Food Type
Premises
Type
Testing
parameters
Rationale for sampling Additional Information
Number
of
Samples
Minimum
Pack size
Sample
Schedule
(Q2/Q3/Q4)
MICROBIOLOGICAL EXAMINATION   
1. 
FSS222301
Reconstituted
frozen raw 
coated chicken
products
Retailers Salmonella,
generic E.coli
Recent outbreak linked
to such products,
horizon scanning
activities indicate
issues with imported
poultry meat and
products
• All size retailers (including supermarkets)
• Sample frozen coated chicken products,
such us nuggets, poppets, poppers, gou-
jons, dippers, etc. 
• Must be reconstituted product, do not
sample whole cuts of meat
• Do not sample cooked products in-
tended for re-heating
• 2 • 100g • Q2
2. 
FSS222302
Soft and semi-
soft ripened
unpasteurised
cheese
Retailers,
Caterers
Listeria
monocytogenes
detection and
enumeration,
STEC, generic
E.coli
Issues continue to be
detected through
horizon scanning.
Continued surveillance
to monitor compliance
• For retail setting - sampling should be tar-
geted at delicatessens, cheesemongers,
but can include supermarkets, with focus
on cheese counters where possible.
• For catering setting - sampling should be
targeted at cheeseboards, focusing on un-
packed cheeses and cheeseboards 
• Sampling should focus on soft and semi-
soft ripened cheeses, (blue cheeses, sur-
face-ripen cheeses, etc.)
• 2 • 100g • Q3
3. 
FSS222303
Soft and semi-
soft ripened 
pasteurised
cheese 
Retailers,
Caterers
Listeria
monocytogenes
detection and
enumeration,
STEC, generic
E.coli, 
Issues continue to be
detected through
horizon scanning.
Continued surveillance
to monitor compliance
• For retail setting - sampling should be tar-
geted at delicatessens, cheesemongers,
but can include supermarkets, with focus
on cheese counters where possible.
• For catering setting - sampling should be
targeted at cheeseboards, focusing on un-
packed cheeses and cheeseboards 
• 2 • 100g • Q4
Page 203 of 258

Page 204

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 24 of 28 
• Sampling should focus on soft and semi-
soft ripened cheeses, (blue cheeses, sur-
face-ripen cheeses, etc.)
4. 
FSS222304
Imported  ready-
to-eat cured
meats 
Retailers 
Salmonella,
Listeria
monocytogenes
detection and
enumeration,
generic E. coli
Issues continue to be
detected through
horizon scanning.
Gathering data for the
PATH-Safe project 
• Sampling should focus on small retailers,
delicatessens
• Sampling to include imported RTE cured
meat, charcuterie style products, biltong,
etc. 
• 2 • 100g • Q2
5. 
FSS222305 
Imported (non-
EU) melon and
papaya - whole 
Retailers  Salmonella,
generic E. coli
Issues detected
through horizon
scanning. Recent
outbreak linked to
imported melons
Gathering data for the
PATH-Safe project 
• All size retailers
• Target whole fruit, any melon variety
(but especially Galia and cantaloupe) and
papaya imported from non-EU countries 
• Testing procedure to follow this protocol:
25 g cut-offs from both ends of the fruit
(melon/papaya) – the fruit to be then
submerged in broth for ~ 30 min and this
broth-rinse to be then combined with the
25 g cut-off for incubation of the sample–
thus the resulting isolate can come from
the end-peels and/or just the surface of
the fruit. There was no central fruit flesh
used.
• 1 • 100g • Q3
6. 
FSS222306 
Imported (non-
EU) melon and
papaya - pre-cut  Retailers 
Salmonella,
Listeria
monocytogenes
detection and
Issues detected
through horizon
scanning. Recent
outbreak linked to
imported melons
• All size retailers
• Sample pre-cut fruit, any melon variety
(but especially Galia and cantaloupe) and
papaya imported from non-EU countries 
• 2 • 100g • Q4
Page 204 of 258

Page 205

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 25 of 28 
enumeration,
generic E. coli
Gathering data for the
PATH-Safe project 
• Preference for fresh fruit, but frozen can
be sampled if required due to availability.
Do not sample dried fruit.
7. 
FSS222307
Flour
Manufactu
rers
Retailers
Bake
houses
STEC, generic E.
coli
Issues detected
through horizon
scanning.
Gathering data for the
PATH-Safe project 
• All retailers, manufacturers and bake
houses/bakeries
• 2 • 100g • Q2
8. 
FSS222308
Soft berries  Retailers Generic E. coli  Gathering data for the
PATH-SAFE project
•  All size retailers, farmer markets, farm
shops.
• Sample raspberries, strawberries, blue-
berries of both domestic and imported
origin
• Test samples as received – without wash-
ing
• 2 • 100g • Q3
9. 
FSS222309  Salad leaves Retailers Generic E. coli Gathering data for the
PATH-SAFE project
• Sample bagged or un-bagged products,
domestic or imported
• Preference for unwashed products, but
washed can be sampled if required due
to availability; please include in product
description when uploading sample
• 2 • 100g • Q4
10. 
FSS222310
Cooked, sliced
ham and beef Retailers Generic E. coli Gathering data for the
PATH-SAFE project
• All size retailers, domestic or imported
origin
• 2 • 100g • Q2
11. 
FSS222311
Raw venison
sausages and
burgers
Retailers Generic E. coli Gathering data for the
PATH-SAFE project
• Sampling should be at both small retail-
ers (including butchers) and larger retail-
ers including supermarket, to try to in-
• 2 • 100g • Q3
Page 205 of 258

Page 206

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 26 of 28 
clude varied suppliers, but it is under-
stood the number of suppliers of these
products may be limited
12. 
FSS222312
Raw lamb mince Retailers Generic E. coli Gathering data for the
PATH-SAFE project
• All size retailers, including butchers and
supermarkets
• Domestic or imported samples are ac-
ceptable
• 2 • 100g • Q4
CHEMICAL ANALYSIS   
13. 
FSS222313
Imported (non-
EU) fishery
products
Importers
Retailers
Heavy metals
(lead, cadmium,
mercury) and
arsenic
Issues detected
through horizon
scanning
• All size retailers, including fish mongers –
imported, non-EU products only. 
• Sampling focus on fresh and frozen prod-
uct. Do not sample tinned, canned,
smoked or process products
• Targeting products such as tuna, sword-
fish, squid, bivalve mollusc; farmed
prawn and shrimp; when sampling crabs
and lobster do not collect whole, live ani-
mals.
• 2 • 150g • Q2
14. 
FSS222314
Kombucha
Manufactu
rers
Retailers
Caterers
Alcohol content
Issues detected
through horizon
scanning
• Sampling targeted to smaller producers,
independent shops, but can also sample
at larger retailers and catering establish-
ments
• 2 • 500ml • Q3
15. 
FSS222315
Fish/shellfish oil
based
supplements 
Retailers
Heavy metals
(lead, cadmium,
mercury, arsenic)
and FAME 
Issues detected
through horizon
scanning
• All fish (or shellfish if applicable) oil sup-
plements, such as cod liver oil, in either
liquid or capsule/tablet form
• All size retailers 
• 2 • 150g • Q4
Page 206 of 258

Page 207

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 27 of 28 
AUTHENTICITY TESTING   
16. 
FSS222316
Battered,
breaded fin-fish
products  Retailers  Fish Speciation
To check that labelling
of species is accurate
and detect substitution
with alternative
species.
• All size retailers.
• Sampling targeted to fin-fish products
with clear specification of species on the
label to allow for assessment of compli-
ance.
• Do not sample shellfish products (e.g. do
not sample scampi )  
• Samples should be tested for presence of
other fish species
• 2 • 150g • Q2
ALLERGEN TESTING   
17. 
FSS222317
Pre-packed for
direct sale (PPDS)
products
Retailers
and
caterers
Milk, Gluten,
Almond and
Cashew
Previous failures and
to assess compliance
with new legislation
covering PPDS
products
• Sample products with no indication of the
presence of the allergens being tested
(i.e. do not sample products specifically
labelled “gluten-free”, we are looking to
sample products with no allergen men-
tioned and test for its presence)
• Target “on-the-go” foods (sandwiches,
salads, baked goods), the products that
the PPDS legislation was intended for
• 1 • 200g • Q3 
Page 207 of 258

Page 208

Midlothian Council 
Food Service Plan 2023-2024 
Midlothian Food Service Plan 23/24     Page 28 of 28  Page 208 of 258

Page 209

Appendix B   
GM April 2023  Page 1 of 11
Midlothian Council Food Law Enforcement 
Review of Service Performance against the Food Service Plan 2022 - 2023 
Food Standards Scotland (FSS) require each local Food Authority to produce a
periodic review of the authority’s annual plan showing how it met the duty of
the Authority to regulate and enforce food law in its area. The coronavirus
pandemic caused the cessation of almost all routine on-site food inspection
work from March 2020 onwards. This review covers the period from 1 April
2022 to 31 March 2023, the first year of the food law interventions programme
restart post pandemic lockdown.
1.0 Introduction 
1.1 The role of the food service is to ensure that food businesses protect the
public of Midlothian from harm that might arise from food – be that food borne
infection, lack of labelling of allergens, fraud or contamination.  We do this by
regular interventions and inspections of businesses, taking samples of food,
through providing advice and by investigating complaints and concerns. Food
Officers have enforcement powers to compel compliance with the law and to
report those committing an offence to the Crown Office Procurator Fiscal
Service.  The customer base for our inspection, sampling and other regulatory
activity is all of the food businesses operating in Midlothian. 
1.2 The Administration and Service Planning Code of Practice issued by Food
Standards Scotland, requires food authorities to report on the performance of
their Food Service each year.
1.3 This review reports on the activity of the Food Service within the Protective
Services, Business Regulation Team during the financial year 2022-23. 
1.4 During the year of this plan the Business Regulation Food and Safety Team
had a vacancy of 1.5 FTE, equalling 25% of our workforce. In addition one
member of the team went on long term absence in February 2023. 
1.5 External contractors were contracted to carry out low risk food law
interventions between October 2022 and March 2023 with all inspection work
completed by experienced and qualified Environmental Health Officers. 
1.6 The national shortage of qualified EHOs is currently an issue for all local
authorities in Scotland and is of major concern to the profession. To help
alleviate this, Midlothian Council adopted a “grow our own” policy and has
been supporting a student EHO through the required practical training and
final year of their Environmental Health degree.  It is anticipated that the
candidate is ready to present for their professional qualification exams in
September 2023 to gain the REHIS Diploma in Environmental Health and
thereafter practice as an EHO. A second graduate EHO was also being
supported by Midlothian Council to complete their practical training however
they have resigned and will shortly leave Midlothian Council.
Item 5.12
Page 209 of 258

Page 210

Appendix B   
GM April 2023  Page 2 of 11
2.0 Food Business profile
2.1 As of 31 March 2023 there were 982 registered food businesses in
Midlothian. 
The number of food businesses in Midlothian continues to grow although this
has slowed since the Coronavirus pandemic (Figure 1). Of note is that for the
last 3 years, 26% of the growth in food business numbers has come from
domestic based operations – mostly small scale baking. Between April 2022
and March 2023, 77 new food businesses registered and112 food businesses
ceased trading. 
Figure 1 – Number of Food Business Registered in Midlothian by Year
2.2 Although food business operators are supposed to notify the authority when
they cease trading few do.  Information about changes in ownership is
gathered from new registrations of existing premises where the Food
Business Operator (FBO) changes or when officers visit. 
3.0 Performance against service plan objectives
Objective 1:  Complete Programmed Food law Interventions
3.1 In the year 2022- 2023 the Food Service planned to inspect 290 food
businesses to assess their compliance with food safety law (hygiene and food
standards). The Service completed 100% of the inspections planned at the
highest risk premises and 97% of the high risk premises in Priority 2.
500
600
700
800
900
1000
1100
1200
2005 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Number of premises
Year
Number of food premises
at 31st March 2005 - 2023
Page 210 of 258

Page 211

Appendix B   
GM April 2023  Page 3 of 11 
One of those businesses missed in Priority 2 was a seasonal businesses that
was not operational and was rescheduled for a more appropriate time.
3.2 During the year the Food Service completed 321 food inspections, for a
breakdown see table 1. The additional inspections were due to new food
businesses, either registering or being identified by officers, or where
intensive interventions were required to improve compliance at businesses
with serious or significant non-compliances.  
3.3  Within this first year of the restart programme, 32 food premises were found to
have serious or significant non-compliances with 16 enforcement notices
being issued for the most serious contraventions. These premises required
intensive intervention with 2 or more inspections carried out to support and
encourage each business to improve compliance. 
The poor standards found in these premises is thought to be due to a decline
in standards as a result of the Coronavirus pandemic.  Several of these were
food businesses taken over or started by persons with little or no knowledge
and understanding of food safety. This is also coupled with the negative
impact of the increased cost of living. 
After Food Officers intensive intervention with these premises, 81% were
subsequently risk rated as generally compliant with only minor non-
compliances.
3.4  During visits Food Officers found 34 food premises had ceased trading.
3.5 The increased number of inspections achieved within this year was only
possible due to the work of external contractors supporting the Food Service
by carrying out low risk food inspections. 
Food Interventions April 2022 – March 2023
Priority Category
Number of
planned
interventions
Number (%)
Achieved
Against Plan
Additional
Interventions
Achieved
Total Number
of
Interventions
completed
Highest Risk Premises - Priority 1 10 10 (100%) +11 21
High Risk - Priority 2 69 67 (97%) +21 88
Medium/Low Risk - Priority 3, 4 and 5 211 185 (88%) / 185
Lowest Risk Premises - Priority 6 
(not included in programme)   +27 27
Total 290 262 (90%) +59 321 
Table 1 - Food Interventions April 2022 – March 2023
Page 211 of 258

Page 212

Appendix B   
GM April 2023  Page 4 of 11 
Objective 2: Approved Premises Intervention
3.6 Year 2022-2023 was the first year, Phase 1, of implementing Food Standards
Scotland (FSS) new Official Controls Verification (OCV) interventions at
approved premises within Midlothian. During the year the method and
recording of these interventions has been developed using the ‘OCV
Implementation Guide’ provided by FSS and Scottish Food Enforcement
Liaison Committee (SFELC).
3.7 A fact finding visit was made to the Food Service at East Lothian Council, who
were part of the FSS pilot project, to understand how they had implemented
this new approach. It was clear that a considerable amount of time was
required to get this new approach started.
3.8  All of our highest risk approved premises; manufacturing meat products and
dairy products, were inspected or audited at least twice within the year. Food
safety management systems were requested from business, including Hazard
Analysis Critical Controls (HACCP) to begin research and assessment of the
complex processes involved.  As an example, Food Officers carried out 3
interventions at a milk processing plant and 5 interventions at a meat products
manufacturer, each of these visits requires 2 officers.
The majority of the lower risk, cold stores and an egg packing centre, received
at least 1 intervention and documentation was requested to allow assessment
to begin for Phase 2. 
3.9 Due to the additional intensive food law interventions and other conflicting
work activities, which took priority and required enforcement resources to be
diverted, not all the planned OCV interventions were achieved in full.  For
example a serious health and safety accident required investigation and
resulting in a report to the COPFS.
3.10 The new method for Approved Premises Intervention will continue to be
developed within the coming year, 2023-2024, and priority will be given to
delivering the planned OCV interventions. It is predicted that additional time
will need to be allocated to these high risk premises in future years as we
continue to implement this.
Objectives 3 and 4: Complete Sampling from Manufacturing Premises in
Midlothian and National Sampling Plans
3.11 During the year 86 food samples were taken, see figure 2. A total of 71 official
control samples were taken from manufacturing premises and for Food
Standards Scotland Sampling Survey. 
Page 212 of 258

Page 213

Appendix B   
GM April 2023  Page 5 of 11 
Figure 2 – Number and Types of samples taken 2022- 2023
3.12 About 15% of the samples taken have been reported as “failures”, see table 2
for examples.
Labelling/Compositional Contraventions
Rapeseed Oil  Nutritional labelling values/units incorrect
Pickled vegetable
products
Not marked with name of the food. Abbreviation of ‘GF’
used for gluten free.
Meat Products Ingredients not labelled correctly, allergen not emphasised
in ingredients list, nutritional information not correct, high
levels of salt, sulphur dioxide above permitted levels.
Prepacked Filled Roll Produce defined as pre-packed for direct sale not labelled
with complete ingredients list in descending weight,
ingredients containing allergens not highlighted.
Contamination Complaints
Foreign object in
chicken fillet
Metal contamination similar to a pin that links a watch strap
or conveyor belt.
Microbiological Contamination
Boiled rice from a
takeaway
High aerobic colony count indicating poor quality and / or
lack of temperature control.
Wheat flour Presence of shiga toxin gene. Indication of possible
presence of STEC organisms in the food. Note it is
anticipated this organism would be killed during normal
cooking processes
Table 2 - Examples of sample ‘failures’ April 2022 – March 2023
3.13  At the time of review, the results of 8 composition and labelling samples had
not yet been received from Edinburgh Scientific Services. 
46
21
37
Samples Taken 2022 - 2023
CHEM
FCONT
GLUTEN
MICRO
Page 213 of 258

Page 214

Appendix B   
GM April 2023  Page 6 of 11
Objective 5:  Commence Investigation of Food Related Requests for Service
within Target Working Days
3.14 The Food and Safety Team received 515 service requests during the year, of
which 445 (86%) related to food related matters. Table 2 shows the
breakdown of the types of request received. These are received from
Midlothian residents, businesses and other council departments. 
3.15 The Food Service was able to respond to 84% of food related service
requests from Midlothian residents and businesses within the target response
time of 5 working days.
3.16 An average year – over the last 10 years, generates approximately 430
service requests received by the team. This year was a significant increase
with almost 20% more requests received. In addition, team numbers were
reduced due to vacancies and consequently the work was spread across
fewer FTE staff.  The restart of the planned interventions took priority and has
shown that standards in food premises have reduced, requiring increased
numbers of interventions by officers to get businesses back into a state of
compliance.
Table 2: Service Requests dealt with by Food and Safety Team 2022-23
Type of Service Request Number received
alcohol Food certificate s50 5
alcohol licence occasional 1
alleged food fraud 1
alleged food poisoning 24
Building Standards Consultation 4
Caravan/Camping Sites 4
contact from other LA about our premises 2
Dog Fouling 2
employee workplace complaint 2
Engineers inspection defects report 2
Export certification 31
Food Alert for ACTION 1
Food Alert for info PRIN AA 2
food business registration 13
food complaint other 37
foreign body contamination 6
Freedom of Info Request 2
Health and safety advice 22
labelling/composition 12
pests present/infestation 6
Planning consultation 14
Poor hygiene/practices 16
Private Rented Housing 2
public building water quality 1
Page 214 of 258

Page 215

Appendix B   
GM April 2023  Page 7 of 11
public complaint about workplace 6
public enquiry 1
Public Entertainments Licence 57
Request for food law advice 71
Safety Advisory Group 104
Skin piercing licence 17
Smoking on premises 1
street trader food certificate s39 15
Street Traders Licence 5
temp public entertainment licence 1
Temporary Market Operators Licence 7
Use by/best before 2
waste storage arrangements 14
Zoo licence 2
Total 515 
3.17 The statistics demonstrate that there has been an increase in workload
associated with the Safety Advisory Group (SAG). This multidisciplinary group
considers applications from event organisers and offers advice on public
safety at events. The aim is to help organisers with the planning and
management of an event and to ensure cooperation and coordination
between all relevant agencies.   
In addition the service also received 17 reports of accidents in workplaces.
The majority could be dealt with by a single intervention, but others required
visits and further investigation. A serious incident resulting in a significant
injury, required a report to the Crown Office Procurator Fiscal Service and a
second serious accident investigation remains ongoing at present. 
Objective 6: Investigate Food and Water Borne Disease in Co-ordination with
Health Authorities 
3.18 Between April 2022 and March 2023, 30 notifications of food related illness
were received from the Health Protection Team at NHS Lothian, see figure 3.
This is above the average for Midlothian Food Service who on average
receive approximately 22 reported cases of infectious disease per year.
Despite the 30% increase in reported cases there were no identified food
related outbreaks.
Page 215 of 258

Page 216

Appendix B   
GM April 2023  Page 8 of 11 
Figure 3 – Number of Infectious Disease Notifications between April 2022 – March 2023 
Objective 7: Respond to Food Alerts by Food Standard Scotland 
3.19 A number of Food Alerts for Action and Food Alert for Information were
received throughout the year. These varied in terms of significance and
included; 
• In April 2022 the Food Service were advised by FSS that there had been
shortages in the sunflower oil supply chain due to the situation in Ukraine.
This required contact to be made with one of our largest food manufacturers
to discuss the options available and reduce the impact on them and their
consumers due to labelling and composition issues. 
• In May 2022 Midlothian Council Food Service were alerted of a product recall
due to the possible presence of salmonella in chocolate products. FSS
request the assistance of the Food Service to raise awareness of this in small
retail businesses within the area.  Correspondence was sent to 92 identified
businesses with information and a customer notice to display at their
premises. Follow up visits were made at 21 premises, 5 of which had already
removed the product from sale and 1 removed the product on the instruction
of the Food Officer at the time of the visit. 
• An Allergy Alert, due to an undeclared allergen on the label of a product
manufactured in Midlothian, was initiated by Midlothian Council Food Service,
in conjunction with Food Standards Scotland. This matter was, identified
during a routine inspection.  In conjunction the food business initiated a
product recall and made contact with allergy organisations to raise awareness
of the issue. 
0
1
2
3
4
5
6
7
8
9
10
Total
Total
Page 216 of 258

Page 217

Appendix B   
GM April 2023  Page 9 of 11
Objective 8: Ensure all Authorised Officers Receive a Minimum of 10 hours
Food Related Competency Training 
3.20 All Food Officers has been given the opportunity to gain 10 hours of food
related training. This includes for example, research on new emerging topics
or complex processes and new learning at food liaison groups. 
4.0  Enforcement Activity
4.1 The enforcement activity required during 2022 - 2023 is summarised in Table
3.  The previously reported increase in intensive interventions, due to poor
and unsatisfactory standards found at food premises, has seen an increase in
enforcement activity required. 
Table 3 - Type and Number of Enforcement Actions taken April 2022 – March 2023
4.2 Remedial Action Notices were served on businesses for serious cross
contamination issues, lack of hot water and significant pest issues. These
notices were for serious issues that required to be resolved immediately. 
Hygiene Improvement Notices requiring improvement within defined
timescales were generally served on structural issues, e.g. damaged flooring
or lack of adequate hand wash facilities, or for failure to have adequate
systems in place to ensure food safety.
4.3 Significant enforcement action was required when a resident alerted
Environmental Health to a serious infestation of rats affecting their property. 
On investigation it was discovered that the operator of the food business
below had not contracted any professional pest control services and was
unable to cope with the infestation. They had closed the premises with the
Enforcement Activity 19-20 20-21 21-22 22-23
Remedial Action
Notices
2 1 2 8
Food Detention Notices 0 0 0 0
Hygiene Improvement
Notices
1 2 5 8
Emergency Hygiene
Prohibition Notices
0 0 0 0
Voluntary Closures 0 0 0 1
Written Warnings re
hygiene or standards
contraventions
109 1 50 92
Reports to the
Procurator Fiscal
Service 
0 0 0 1
Food surrenders or
seizures
0 0 1 1
Page 217 of 258

Page 218

Appendix B   
GM April 2023  Page 10 of 11
remaining food left inside, allowing the rats to continue to enter the premises
and feast on the foodstuff with no disturbance. The state of the premises was
shocking, see photographs below. Animal carcases, rat droppings, and
gnawed/contaminated food were found, requiring immediate action to prevent
potentially contaminated food and food packaging leaving the premises. A
large amount of contaminated food and food packaging was removed from
the premises, with the help of Midlothian Waste Services, in agreement with
the Food Business Operator. The required improvements were made to the
premises. It no longer operates as a food business. 
4.4 A prosecution report was finalised after thorough investigation and
communication with the Procurator Fiscal Service over several years.  A
member of the public had had a severe anaphylactic reaction to a meal
prepared by a Midlothian food business, which had been specifically
requested to contain ‘no nuts’ and was found to contain peanuts. 
Unfortunately despite best efforts in gathering evidence and preparing the
case it was dismissed from court when the injured party failed to appear as a
witness.  
5 The Food Hygiene Information Scheme (FHIS) 
5.1 The Food Hygiene Information Scheme (FHIS) remains in operation across
Scotland. This Scheme allows consumers to view the outcome of the
assessment made of any business in the scheme, when it was last inspected
by the Food Service. Businesses can choose to display a certificate at the
premises and consumers can check the rating for any premises covered by
the scheme on the Food Standards Agency website at
http://www.food.gov.uk/scotland/.  Businesses are awarded either a “Pass”
certificate or an “Improvement Required” rating.  
Page 218 of 258

Page 219

Appendix B   
GM April 2023  Page 11 of 11
5.2 In previous years Midlothian has had an overall PASS rate of around 88%.
The ratings for all the 601 relevant, Midlothian food business, at the end of
March 2023, show a 73% PASS rate, illustrated in Figure 4. At present due to
the ‘missed’ inspections some data contributing to this calculation is historic.
For comparison, the FHIS ratings for this year alone are also presented in
Figure 4, again showing the significant reduction in standards, with only 64%
of Midlothian food businesses achieving a PASS rating. The number of food
businesses Awaiting Inspection has increased. 
Figure 4 – Food Hygiene Information Scheme Ratings 2023 
83, 14%
77, 13%
441, 73%
FHIS Ratings of all relevant Midlothain
Food Businesses as at March 2023
Awaiting Inspection
Improvement Required
Pass
20%
16%64%
FHIS Ratings of Midlothian Food
Businesses inspected 2022 - 2023
Awaiting Inspection
Improvement Required
Pass
Page 219 of 258

Page 220

Page 220 of 258

Page 221

Cabinet                                                                                              
30 May 2023 
Waste Services – Proposed application for external funding to facilitate
the introduction of kerbside collections of textiles and small electrical
appliances 
Report by Derek Oliver, Chief Officer Place 
Report for Decision 
1 Recommendations 
Cabinet is recommended to: 
i. note the content of this report in conjunction with the proposed
application to the Scottish Government / Zero Waste Scotland’s
Recycling Improvement Fund, and to 
ii. approve submission of the funding application in Appendix B as            
attached. 
2 Purpose of Report/Executive Summary 
The purpose of this report is for members approval to submit a funding            
application to the Recycling Improvement Fund for the capital costs            
associated with the proposed introduction of a kerbside collection of            
textiles, small electrical appliances and batteries. 
Date: 15 May 2023
Report contact: Kevin Anderson, Executive Director – Place
kevin.anderson@midlothian.gov.uk 
Item 5.13
Page 221 of 258

Page 222

2 
3. Background 
3.1 The Scottish Government announced in September 2020 a £70 million
fund to improve local authority waste and recycling collection infrastructure.
The Recycling Improvement Fund (RIF) has been administered by Zero
Waste Scotland since April 2021.  
3.2 Midlothian Council has already successfully secured £150k funding from
this source as £30k was awarded in 2022 to allow Waste Services to
introduce “in-cab” technology to improve both the efficiency of running the
service and improve the service provided to customers. To operate the
hardware funded, a cloud based software solution is required to provide the
required functionality. Consultants from SOCITM (society for innovation,
technology and modernisation) are looking at digital delivery. The delay in
implementing that project may be viewed unfavourably during the evaluation
and Zero Waste Scotland may seek reassurances that this is moving forward
before agreeing additional funding. 
3.3 £120k was awarded in 2023/24 for an additional food waste collection
vehicle and kerbside caddies to allow all households in Midlothian to receive a
weekly collection of food waste. This service, currently expected to be
operational from Q2 2023/24, will allow a further 2,600 households,
predominantly in rural areas, to recycle their food waste and is predicted to
divert an additional 96 tonnes per annum for recycling.  
3.4 As Zero Waste Scotland are keen to support new opportunities for the
collection of problematic materials and identified high carbon impact materials,
such as waste electronic equipment and textiles, Waste Services propose to
make a further application to the Recycling Improvement Fund for the capital
costs associated with introducing kerbside collections of textiles, small
electrical appliances and batteries. 
4. Proposed new service 
4.1 Households will be asked to present textiles and small electrical
appliances in a plastic crate/box next to their food waste caddy. Their existing
kerbside glass box can be used for this purpose. 
4.2 The storage compartment behind the crew-cab on our six food waste
collection vehicles will be retrofitted to accommodate a half-pallet box into
which materials will be collected by existing collection crews. On return to the
depot, the pallet box will be removed using a forklift truck, by existing
members of staff, and the material bulked in the adjoining Household Waste
Recycling Centre’s Waste Electric and Electronic Equipment (WEEE) skip for
small appliances for onward movement by our Producer Compliance Scheme.
Page 222 of 258

Page 223

3 
Textiles will be removed from the pallet box and bulked for contractor
collection. 
4.3 If the funding application is successful, it is proposed the service is
introduced to all households from October 2023. 
4.4 Recycling Performance improvement in each year as the proposed new
service is expected to divert from the residual waste stream: 
• Between 76 and 110 tonnes of small electrical appliances 
• Between 280 and 660 tonnes of textiles 
• Around 3 tonnes of batteries 
5 Report Implications 
5.1 Resource 
Capital 
£96,992.90 will be requested from the Recycling Improvement Fund for: 
• a forklift with a 360-degree fork rotator 
• retrofitting the existing storage space 
• pallet boxes 
• battery collection boxes 
• kerbside boxes 
Revenue 
£22,030 has been requested from the Material Focus Electrical Recycling
Fund to assist with the cost of promoting the service. 
Communication plan delivery costs including lamppost banner advertising,
teaser postcards and an informational leaflet for householders. 
Internal staff time in procurement and tendering exercises, route planning,
design and delivery of communication activities, staff training, staffing of
vehicle, vehicle servicing, maintenance and fuel, financial administration,
waste data collection and reporting, customer liaison etc are expected to be
funded from existing Council staff and revenue resources. 
An income of between £20,300 and £66,000 may be achieved from the sale
of textiles. 
Page 223 of 258

Page 224

4 
A saving of between £31,860 and £69,840 in residual waste disposal costs
could be achieved as “black bag” waste is instead diverted for recycling. 
5.2 Risk 
Failure to transform recycling collection services could expose the Council to
reputational and financial risk. 
5.3      Digital 
The implementation of new recycling collection services is expected to be
supported by the introduction of a Digital Depot system and the use of “in-cab”
digital devices. 
5.4 Single Midlothian Plan and Business Transformation
Themes addressed in this report: 
Community safety
Adult health, care and housing
Getting it right for every Midlothian child 
Improving opportunities in Midlothian 
Sustainable growth
Business transformation and Best Value 
None of the above 
5.5  Impact on Performance and Outcomes 
Introducing new recycling collection services is intended to improve the  
resource efficiency of the waste service. 
5.6 Ensuring Equalities 
Waste collection services affect all households in Midlothian. As such
the subject of this report does not have a significant detrimental impact
on equality. There is a positive impact on the environment and
economy. 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Background information/Links 
Page 224 of 258

Page 225

5 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value 
A.5 Involving Communities and Other Stakeholders 
In a customer consultation held in 2021, when asked “What  
additional materials would you like us to collect at the kerbside?”, 57%  
of respondents said textiles, 58% of respondents said household  
batteries and 63% of respondents said small electrical items.
A.6 Impact on Performance and Outcomes 
Introducing new recycling services is expected to have a positive
impact on recycling diversion. 
A.7 Adopting a Preventative Approach 
The proposed new recycling collection services prioritise resource use,  
fuel and fleet efficiency and an associated reduction in carbon. 
A.8 Supporting Sustainable Development 
Page 225 of 258

Page 226

6 
An increase in material collected for reuse and recycling is expected to 
be achieved by the scheme. 
APPENDIX B 
Zero Waste Scotland Recycling Improvement Fund (RIF) Application
Form – Proposed kerbside collection of textiles and small electrical
appliances. 
Page 226 of 258

Page 227

1
Zero Waste Scotland
Recycling Improvement Fund
(RIF)
Application Form
April 2022
Item 5.13
Page 227 of 258

Page 228

2 
APPLICATION FORM 
Zero Waste Scotland
Recycling Improvement Fund 
IMPORTANT NOTES 
Please ensure that you read the Guidance Document in full prior to completing
this application form. Please use the Guidance Document alongside this
Application form to ensure that the required information is being provided
correctly. 
Please complete all sections of this form electronically, altering the size of the boxes
and the position of the page breaks as necessary, whilst taking account of any word /
character number limits.  Incomplete applications will not be assessed.  Should you
need to continue any section on additional sheets, please indicate the relevant
section reference on each sheet. Appendices to support your application should be
attached as required and referenced within the main body of the application form. 
SUBMISSION INSTRUCTIONS
Please email one electronic copy of your application together with all supporting
evidence to RecyclingSupport@zerowastescotland.org.uk 
For administration use       Application number       Date received       
Page 228 of 258

Page 229

3 
Contents 
Section 1: Local Authority Details ....................................................................................... 4
Section 2: Project Details .................................................................................................. 5
2.1 Project summary ............................................................................................ 5
2.2 Detailed project information ............................................................................. 6
Section 3: Project Financing ............................................................................................ 21
Section 4: Supporting & Supplementary Information .......................................................... 26
Section 5: Confidentiality and Declaration ......................................................................... 30
Confidentiality and Privacy .............................................................................................. 30
Declaration ..................................................................................................................... 30
Section 6: Application Form checklist ............................................................................... 31 
Page 229 of 258

Page 230

4 
Section 1: Local Authority Details 
Please insert the name of your Zero Waste
Scotland contact. 
1.1 Name of Local Authority 
Midlothian Council 
1.2 Address of Local Authority 
Midlothian House
Buccleuch Street
Dalkeith 
EH22 1DN 
1.3 Contact details
Name and job title of person dealing with this application. 
Clare Neely
Waste Services Manager - Strategy (acting) 
Tel No.:  0131 561 5332 Mobile: 07795 333510
E-mail address: clare.neely@midlothian.gov.uk
Address: 
Waste Services
Stobhill Depot
Newtongrange
EH22 4NU 
1.4 If this proposal is a joint bid with multiple local authorities and/or third sector or commercial
partners, please provide legal names, addresses and lead contact name of any partners. 
This is not a joint proposal. 
Page 230 of 258

Page 231

5 
Section 2: Project Details 
2.1 Project summary - please provide a summary of the proposed project (500-word limit). 
Midlothian is a semi-rural Council area less than 10 miles south of Edinburgh city centre. We are one of the
smallest Council areas in mainland Scotland, but the fastest growing. 
Waste is a growth area for Midlothian Council, both in terms of the amount that is to be collected due to
increasing house numbers in the area, but also in terms of wider public awareness and concern over what
happens to materials separated for recycling. 
Midlothian Council currently provides a wide range of waste management and recycling services: 
The kerbside collection service for individual properties currently comprises:
• A 240L grey bin for residual waste collected fortnightly
• A 360L blue bin for dry mixed recycling collected fortnightly
• A 45L kerbside box for glass bottles and jars collected fortnightly
• A 21L silver caddy for food waste collected weekly 
• Communal residual and recycling waste bins are offered at flatted properties
• A chargeable special uplift service is available for the collection of bulky household items.
• Two Household Waste Recycling Centres (HWRCs) offer facilities to accept a wide range of additional
materials for recycling. 
We have recently completed an Options Appraisal with ZWS and Eunomia to determine how best we can
transition our services to meet the recommendations in the Household Waste Charter. This is likely to include a
reduction in residual waste capacity and a move to twin stream collections of recycling. 
To “accelerate progress towards 2025 waste and recycling targets and Scotland’s net-zero carbon commitment”
Midlothian Council proposes introducing new fortnightly kerbside collections of:
• Textiles
• Small electrical appliances
• Household batteries 
Funding is requested for a forklift with a 360-degree fork rotator and pallet boxes to enable these additional
materials to be collected alongside kerbside collections of food waste utilising the storage compartment behind
the crew-cab on the food waste collection vehicles. 
This space will be retrofitted to accommodate a pallet box into which materials will be collected from the
kerbside. On return to the depot, the pallet box will be removed using a forklift truck and the material bulked in
the adjoining HWRC’s WEEE skip for small appliances for onward movement by our PCS. Textiles will be
removed from the pallet box and bulked for contractor collection. 
Although there is an intention to transition waste and recycling collection services to meet the recommendations
in the Household Waste Charter, at this time the timescales to do so have not been set. Implementing this
project now, rather than part of a large service change, allows us to increase the range of materials customers
are able to recycle at the kerbside making it easier to justify that residual waste capacity can be reduced in the
future. 
Promotion of the service can be used as an opportunity to remind customers of the wide range of materials that
can be recycled at the kerbside, the HWRCs and via local community enterprises. 
The service is anticipated to divert an additional 563 tonnes of material per annum from the residual waste
stream and deliver a 2,862 tonne CO2e carbon saving. 
Page 231 of 258

Page 232

6 
2.2 Detailed project information - please detail how the project meets the aims and objectives of the Fund
and creates additional benefits. Please read through the whole section and Guidance Document
before completing, to avoid duplication of information. 
2.2.1 Increased recycling – please provide the predicted tonnage increases in recycling for your authority;
also describe the impacts of this increased tonnage on residual waste disposal (movement between
waste streams). 
(Assessment Criteria – Impact and Transformation & Evidence Led) 
Please adapt the table to suit your project’s needs.
Example 1. Material Stream: Small electrical appliances
Movement
between streams:
Small electrical appliances to be diverted from
residual waste stream due to the introduction of
kerbside collection of this material.
Projected Increase
Change (tpa):
76 – 110 (average of 93)
Methodology: See calculations in Appendix 1a. 
Evidence: Residual tonnage baseline. Average of 3 years from
2019-2022 (excluding 2020).
Use of Waste Composition Analysis data.
Example 2. Material Stream: Household batteries
Movement
between streams:
Batteries to be diverted from residual waste stream
due to the introduction of kerbside collection of this
material. Some diversion from existing retailer in-
store and HWRC collection services is to be
expected.
Projected Increase
Change (tpa):
2.33 – 3.10
Methodology: See calculations in Appendix 1b. 
Evidence: Residual tonnage baseline. Average of 3 years from
2019-2022 (excluding 2020).
Use of Waste Composition Analysis data. 
Increase in re-use – please provide details of items targeted and include the predictions of tonnages of
increase in reuse and / or recycling from reuse activities and the reduction in residual waste disposal
from this activity. 
Please adapt the table to suit your project’s needs.
Example 1. Material Stream: Textiles 
Movement
between streams:
Textiles to be diverted from residual waste stream
due to the introduction of kerbside collection of this
material. 
Although some diversion from existing charitable
sector, community textile banks and HWRC collection
services is to be expected, the tonnages below are
based on the textiles still remaining within grey bin
which this project intends to capture in addition to
existing services.
Project monitoring is expected to show an increase in
overall textile tonnage collected – from all services.
Page 232 of 258

Page 233

7 
Projected Increase
Change (tpa):
280 - 660 (average of 470)
Methodology: See calculations in Appendix 2. 
Evidence:  Residual tonnage baseline. Average of 3 years from
2019-2022 (excluding 2020).
Use of Waste Composition Analysis data.
Contamination figures from incumbent processor. 
2.2.2 Impact on overall waste arisings, from proposed recycling, re-use and disposal improvement
measures - please provide a summary of predicted changes in arisings. 
Figures provided are based on 2022 baseline. 
The recycling tonnage reported in the table below includes kerbside collected dry mixed recycling, glass, garden
waste and food waste. 
• Kerbside collected tonnages of PET plastic bottles, drink cans and glass are expected to fall following
the introduction of the Deposit Return Scheme from March 2024. These tonnages have not been
reflected in the table below.
• Kerbside tonnages of food waste are expected to rise as the service is offered to an additional 2,600
predominantly rural properties - previously excluded from this service - during 2023. These tonnages
have not been reflected in the table below, however this project is predicted to divert an additional 96
tonnes of food waste for recycling per annum. 
For future performance, the average of the expected tonnages of the new materials streams have been used. 
Please adapt the below table contained within the application form to suit your project needs. 
Current performance Performance following RIF project
implementation
Kerbside collections Tonnes p/a % full year Tonnes p/a % full year
Residual waste  17,260 57 16,694 55
Recycling  12,978 43 13,074 43
Re-use  0 0 470 2
Totals 30,238 100 30,238 100 
2.2.3 Improvements to material quality – please explain how this project will improve the quality of collected
and treated materials for end markets. 
(Assessment Criteria – Impact and Transformation & Evidence Led) 
Small WEEE
Promotional / instructional information on the items suitable / not suitable to be collected as part of this service
will be provided to customers at the commencement of the proposed service via the Council website and, subject
to funding, via an informational leaflet. Customers will be requested to present material un-bagged with any
cables or wires wrapped around the appliance within a plastic box / their kerbside glass box placed for collection
adjacent to their food waste caddy to aid visibility for collection crews. 
Items expected to be collected include: mobile phones, disposal vapes, electric toothbrushes, battery operated
toys and musical instruments, hi-fi units, hand-held vacuums and small kitchen electrical items up to the size of a
4-slice toaster / small microwave. Customers will be directed to take items larger than microwave size to their
local Recycling Centre. The kerbside box has an internal measurement of approx. 350mm x 530mm and pallet
box has a width limit of 600mm. 
Items unsuitable for recycling / collection as part of this service will be rejected at source with an informational
postcard left for customers.
Page 233 of 258

Page 234

8 
Household batteries
Promotional / instructional information on the items suitable / not suitable to be collected as part of this service
will be provided to customers at the commencement of the proposed service via the Council website and, subject
to funding, via an informational leaflet. 
Customers will be asked to present their batteries for collection in a clear, sealed sandwich bag / freezer bag (or
equivalent) within a plastic box / their kerbside glass box to aid visibility for collection crews. Button batteries, A,
B, C and D batteries, 9V batteries and mobile phone batteries will be collected. The battery box has dimensions
of approx. 150mm x 200mm x 50mm. 
Items unsuitable for recycling, or collection as part of this service will be rejected at source. We do not intend to
collect volt batteries such as car batteries or power tool batteries. Customers will be directed to take these to
their local Recycling Centre. An informational postcard can be left when rejecting items. 
Textiles
Promotional / instructional information on the items suitable / not suitable to be collected as part of this service
will be provided to customers at the commencement of the proposed service with the specific requirement that
only clean textiles are suitable for reuse / recycling. Information will be provided via the Council website and,
subject to funding, an informational leaflet. 
Items expected to be collected include clean clothes, shoes, bags, belts, bedding, towels and curtains. We will
not collect soiled items, pillows, cushions or duvets or pet beds/bedding. An informational postcard can be left
when rejecting items. 
Customers will be requested to present textiles securely tied in a plastic carrier bag to reduce quality issues
associated with textiles collected at the kerbside in inclement weather. Bags should be presented within a plastic
box / their kerbside glass box placed adjacent to their food waste caddy to aid visibility for collection crews and to
encourage residents to recycle “little and often” rather than undertake one-off “wardrobe clear-outs”. The
kerbside box has an internal measurement of approx. 350mm x 530mm and pallet box has a width limit of
600mm. 
As we expect this service to supplement, rather than replace, existing local charitable sector reuse projects,
overall quality is expected to be low, with low grade textiles unsuitable for reuse instead being used in the
manufacture of cushion stuffing, sound proofing, carpets/ underlay, or industrial cleaning cloths. 
In line with other Local Authorities, in 2022, around 20% by weight of textiles collected in Midlothian from
Recycling Points and rag bag scheme were rejected. It is likely a similar percentage could be applied to textiles
collected as part of this service. 
2.2.4 Carbon Savings – please provide details of your estimation of carbon savings, in terms of tonnes CO2
equivalence, and how these are to be achieved. 
(Assessment Criteria – Impact and Transformation & Evidence Led) 
Please adapt this table to suit your project needs.
Activity / Material
Category
Projected Carbon
Savings (tonnes
CO2e per annum)
Source / Methodology
Textiles -2,840  Zero Waste
Scotland Carbon
Metric 
Assume collect average of upper
and lower projected values = 470
tonnes. Currently incinerated at
216 kgCO2e per tonne.
If reused/recycled a carbon saving
of -2,840kgCO2e could be
achieved 
Page 234 of 258

Page 235

9 
Small WEEE -22  Zero Waste
Scotland Carbon
Metric 
Assume collect average of upper
and lower projected values = 93
tonnes. Currently incinerated at 41
kgCO2e per tonne.
If reused/recycled a carbon saving
of 
-22kgCO2e could be achieved 
TOTAL CO2e
Savings:
-2,862 CO2e per annum 
Please see Appendix 2. 
2.2.5 Policy Alignment - in this section please set out how this project aligns with the following: The
Household Recycling Charter and Code of Practice; the transition towards a Circular Economy; the drive
towards Net-Zero commitments; and other Scottish Government & Local Government Policies (for
example, the national Deposit Return Scheme, the Climate Emergency and Extended Producer
Responsibility). 
Household Recycling Charter and Code of Practice
Midlothian Council became a voluntary signatory to the Charter in May 2016 and in so doing, made a
commitment to transform kerbside collection services to align with best practice, once capital funding
became available. Waste Services have recently undertaken a detailed options appraisal with Zero
Waste Scotland / Eunomia to identify how best this should be done. It is expected a report on the options
will be presented to the Council’s Business Transformation Steering Group for a decision on our future
kerbside waste and recycling collection services in Q1 2023/24. Removing additional waste from the
residual stream helps support customers with a move to reduced capacity for non-recyclable residual
waste. 
The transition towards a Circular Economy
Offering households a kerbside collection of textiles supports the move from a "take, make and dispose"
model to one where materials are kept in use. Alternative local collection services, such as school
uniform swap-shops and winter coat/jacket banks will continue to be promoted to help ensure good
quality clothes remain in Midlothian to support householders in need at a local level – reducing “waste
miles” 
Climate Emergency and the drive towards Net-Zero commitments
Midlothian Council was one of the first local authorities to sign Scotland's Climate Change Declaration,
publicly acknowledging the challenges and opportunities that climate change brings. In December 2019,
Midlothian Council passed a motion declaring a ‘climate emergency’. This includes a commitment to
make the Council’s activities net-zero carbon by 2030. This project proposal demonstrates a clear case
for improving diversion of valuable material away from disposal, with identified carbon efficiency savings.
Deposit Return Scheme
The additional materials proposed for collection do not fall under the scope of the DRS and this project is
not affected by the recently announced extension to the planned implementation date of this scheme. 
Extended Producer Responsibilities
The additional materials proposed for collection do not fall under the scope of the EPR regulations. 
Circular Economy Route Map
The proposed improvement to kerbside services align with the following:
• Package 1: Promoting responsible consumption, production and reuse – providing reuse
services will help deliver the national reuse target and improve the reuse experience for
consumers.
• Package 3: Improve recycling services to households, including textiles and hazardous materials
(small WEEE and batteries). 
Page 235 of 258

Page 236

10 
2.2.6 Other added-value aspects of the project (if relevant) – for instance, please provide details of how the
project provides or increases social and environmental benefits. 
(Assessment Criterion – Strategic and Collaborative) 
Introducing additional kerbside recycling collection services will allow us to: 
• Improve kerbside collections of recycling to address the Waste Targets Route Map. 
• Offer new opportunities for the collection of problematic materials and identified high carbon impact
materials, such as WEEE and textiles. 
• Improve the capture and quality of recyclable materials at the kerbside
• Offer services which maximise yield and capture of high-quality materials for re-processing 
There is customer demand for more kerbside collections. From a customer consultation held in 2021, when
asked “What additional materials would you like us to collect at the kerbside?”, 57% of respondents said textiles,
58% of respondents said household batteries and 63% of respondents said small electrical items. 
At the present time, customers must visit a charity shop or use a neighbourhood textiles recycling bank to recycle
clothes and shoes. They must visit a HWRC to recycle small electrical appliances. Due to the small size of these
materials there is an obvious temptation for customers to dispose of these items in their residual waste bin. By
offering a kerbside collection of these materials, the opportunity to recycle more of their household waste
removes opens up to those who would experience barriers in travelling to a HWRC. 
This service also aims to address misconceptions that clothes unsuitable for reuse cannot be collected for
recycling as “rags”. 
Wider of promotion of the service will raise awareness of other local textile reuse services such as winter clothes
banks. 
Midlothian Council’s procurement strategy has a social theme to place citizens at the heart of everything we do.
Our social value themes will enable us to maximise the opportunities for economic, social and environmental
considerations to be addressed at all stages of the commissioning and procurement cycle. In all our
procurements, we will seek to maximise social value, tailored as appropriate and proportionate for each contract
to ensure compliance with our legal obligations. 
As textiles and small WEEE must be presented for collection in a plastic box / kerbside box adjacent to a
kerbside food waste caddy to ensure collection (to enhance visibility of items for our collection staff) an increase
in participation in the kerbside food waste collection service could be seen, potentially alongside an increase in
glass presentation at the kerbside. Midlothian Council intends to continue to collect glass separately at the
kerbside following the introduction of the DRS, albeit likely at a reduced collection frequency. 
As with food waste, as customers start to separate textiles for recycling they may start to consider the volumes
they actually have available for recycling and make steps to start making more sustainable purchasing decisions
to reduce the amount of clothes they buy. 
2.2.7 Partnership and collaboration potential – please describe what consideration has been given to the
potential for partnership or collaborative working, with local authority, private or third sector partners. 
(Assessment Criterion – Strategic and Collaborative) 
Existing textiles reuse schemes such as school uniform swap shops and winter clothes banks will continue to be
promoted with publicity around the introduction of a kerbside collection of textiles expected to increase
awareness of these initiatives and increase donations of suitable items. 
A competitive tender will be undertaken to contract a textile reprocessor to take the kerbside collected textiles for
reuse/recycling.   
Electrical items and batteries will be bulked for collection by our incumbent WEEE producer compliance scheme.
Page 236 of 258

Page 237

11 
Revenue funding has been requested from the Materials Focus Electricals Recycling Fund to cover some of the
costs associated with the publicity and promotion of the service. This fund excludes procurement of major capital
assets. 
2.3 Project approvals, permissions and consents. Please read through the whole section and
accompanying Guidance Document before completing, to avoid duplication of information.
2.3.1 Member approval - if member, or other board or executive level, approval is required for the project,
please provide details. 
(Assessment Criterion – Acceptability) 
Members would welcome new services that allow residents to recycle additional materials at the kerbside. 
Members were informed of this proposal via a Business Transformation Steering Group meeting on 24 April
2023 and will obtain formal Cabinet approval on 30th May 2023.  The funding application was approved by the
Council’s Corporate Management Team on 10th May 2023. 
2.3.2 Planning permission – please provide high-level details of planning applications and other permissions
required for this project. 
(Assessment Criterion – Acceptability) 
There are no planning permissions associated with this proposal. 
2.3.3 SEPA waste management licences/other regulatory consents etc. – please provide high-level
details of any new licences or approvals, or amendments to licences, that are required for the project. 
(Assessment Criterion – Acceptability) 
Kerbside collected electricals, batteries and textiles will be bulked at Stobhill Waste Transfer Station, SEPA
Licence number WML/L/1023218. 
No amendment to the current licence or site working plan is required. 
WEEE and batteries will be collected by our Producer Compliance Scheme operator. 
Household batteries are sent to GP Batteries, Glasgow - facility licence WMX/W/0037009. 
Small WEEE is collected by ValPak and delivered to Shore Recycling, Perth – facility licence PPC/A/1035205 
Please note that due to the recent fire, the Shore Recycling facility is not currently able to accept WEEE and in
the interim small WEEE is being collected / processed by WEEE Scotland. 
Page 237 of 258

Page 238

12 
2.4 Project timeline and monitoring plans - please complete the project timetable, communications planning template and the delivery and project monitoring table,
so we have a clear understanding of the implementation schedule. Please read through the whole section and accompanying Guidance Document before
completing, to avoid duplication of information.
2.4.1 Project timetable 
Please adapt the following template to detail the timelines of the project. 
(Assessment Criterion – Feasibility) 
For communications planning template, please see Section 2.4.2.
Page 238 of 258

Page 239

13 
2023/24 2024/25 2025/26 2026/27
Activity  Sub activity Start  End  Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Submission to
ZWS  April 23 April 23                
ZWS Board
decision  May 23 May 23                 
Decision
reported back to
Midlothian
Council
June 23 June 23                 
Contracts signed June 23 June 23                
Forklift Specification  June 23 June 23                 
Procurement June 23 June 23                 
Delivery Sept 23 Sept 23                
Vehicle retrofit  Aug 23 Aug 23                
Tender for
textile
processing 
July 23 Sept 23                
Pallet box  Procurement Sept 23 Sept 23                 
Delivery Sept 23 Sept 23                
Staff training  Sept 23 Sept 23                
Service
commencement   Oct 23 ongoing                
Performance
monitoring  Oct 23
Monthly
and then
annually                
Q1 – April – June / Q2 – July – September / Q3 – October – December / Q4 - January – March 
Page 239 of 258

Page 240

14 
2.4.1.1 Flexibility - if there is limited or no prospect of project implementation flexibility, please provide details of all key issues and critical timings. 
The project has a high degree of flexibility. It is currently proposed that the new kerbside collection service for textiles and small WEEE is introduced from
October 2023. 
All six food waste collection vehicles are due for delivery at the end of April. As one of these vehicles has been funded from the Recycling Improvement Fund,
the necessary time will be taken to prioritise the introduction of kerbside food waste collection services in rural areas before this new project is implemented. 
There is expected to be a 10-week lead time for delivery of the forklift truck. 
2.4.1.2 Procurement and supply – please explain the market engagement that has been undertaken, such that it provides reassurance that the project is
foreseeably deliverable within the timescales - for instance asset production timelines and supply chain availability and security. 
Forklift
An “off the shelf” model is being procured and we do not envisage any issues with supply. A lead-time of 10-12 weeks from date of order is expected.   
Pallet boxes
An “off the shelf” item is being procured and we do not envisage any issues with supply. 
Battery box
A bespoke box, albeit used by other Local Authorities offering a multi-stream weekly kerbside recycling collection service, is being procured and we do not
envisage any issues with supply. 
Kerbside box
This will be procured through the Scotland Excel framework. A lead-time of 8-10 weeks from date of order is expected.   
Vehicle retro-fitting
A local mechanical engineering company will be contracted to undertake this work. This is expected to be completed by end September. 
Textiles
A competitive tender exercise will be undertaken for the processing of the textiles once we are confident the project can proceed as planned. Without this in
place, textiles can be uplifted by the incumbent supplier of our textile bank collection service. 
Page 240 of 258

Page 241

15 
WEEE collection / communication
A decision on funding for communication activities associated with the new kerbside collection of small WEEE from Materials Focus is expected at the end of
May 23. Without this, limited funds are available to promote the new services, and promotional activities will be limited to social media activities and lamppost
banner advertising – reducing the impact of the new services. 
2.4.2 Supporting communications and proposed activity 
Please adapt the following template to detail the outline communications plan that supports the project’s implementation. 
N.B The communications budget in to be set out in section 3.3 of the Application. 
(Assessment Criterion – Feasibility) 
Please restrict text fields to 250 words maximum 
Background – identify where you are
• a summary of communications approaches used/delivered in the last two years
• details of any gaps highlighted in your current or past communications activities that need to be addressed 
• Midlothian Council primarily uses the Council’s website to communicate with customers.
• This is supported by social media activity to increase customer engagement.
• The local radio, Black Diamond FM, is also used for promotional activities. 
• Use of printed materials, including kerbside collection calendars, is limited and provided primarily to new occupants and at times of service change.
• Printed materials has included lamppost advertising at key points around the area, and direct mail postcard mailings to all residents.
• Advertising panels are utilised on the side of RCVs.
• The dedicated email address, recycling@midlothian.gov.uk and recycling landing pages on the Council website are provided on all printed materials.
• The dedicated email address is used to respond to specific requests for information from customers.
• Our Community Waste Officer is able to undertake public outreach through community events and educational settings.
• The Council’s Contact Centre are able to answer generic queries on recycling activities from the general public.
• Addressed mailings have been used when collection issues need to be addressed in specific areas.
• The collection crews, and Recycling Centre staff, are the public face of the service and are able to answer general queries from the public.
• Customer email addresses are used to communicate with customers of our chargeable garden waste collection service where specific permission for
this activity has been requested from, and approval given, from customers.
• Printed communications follow Zero Waste Scotland brand guidelines. 
Page 241 of 258

Page 242

16 
Situation analysis – establish where you want to be 
Communication aims and objectives 
• The aims of communication activities are to ensure customers are aware of their new service collecting small electrical appliances, household batteries
and textiles alongside existing kerbside food waste collections.
• Household communication of the proposed new service will be undertaken in a timely manner at key points of the service change, making best use of
available budgets. Funding has been requested from Materials Focus for communication activities.
• Messages will follow Zero Waste Scotland guidelines and be simple, resonate with a wide audience and provide clear calls to action.
• The overall objective is that customers will be clear on:
o the nature of the change
o what exactly the changes are 
o what materials can/cannot be recycled as part of the new service
o key dates relating to the start of the proposed service change 
• The communications plan will be deemed successful if customers are aware of the proposed service change. This will be measured via number of
customer queries received through the Contact Centre, social media and requests for information via the recycling@ email address, as well as
recycling presentation. 
Impact on other services
• Offering kerbside collections of textiles may divert textiles from existing collection methods including charity shops as well as existing textile banks.
Communication activities will highlight and promote the continued use of local winter jacket/coat collection services and school uniform swap-shops to
keep these clothes available to those in need within Midlothian.
• Offering kerbside collections of household batteries may divert batteries from existing retailer take-back points. 
• Offering kerbside collections of small electrical appliances may divert small electrical appliances from this stream at the Recycling Centres.
• Activities will take place to determine the likely impact on existing trade waste collection services and whether the proposed service ought to be offered
to local businesses (eg: electrical retailers) 
Communication planning – establish how you are going to get there
Target audiences
• Householders / service users: 
- Households with individual recycling containers
- Households with shared recycling containers
• Internal audiences: 
- Collection crews and supervisors, 
- Customer contact centre staff 
Page 242 of 258

Page 243

17 
- Library staff
- Elected members
- Corporate communications team members
- School eco-committee members
- Equalities Engagement Team
• External groups/stakeholders:
- Community councils
- Social housing managers
- Carers
• Hard to reach groups:
- Children and Young People
• Media groups:
- Black Diamond FM 
Messaging and strategic approach 
• Types of key messages: 
- service launch
- getting it right
- recycle more/waste less
• Tone of voice to be used: 
- instructional
- collective action
- positive message
• Your overall approach to communications, what you need to communicate: 
- Introduction of new service to collect additional materials
- Key dates
- How to participate 
- How to present items for recycling 
- Items accepted / not accepted
- What happens to your recycling 
• Form that communication will take: 
- Social media plan and managed responses
- Press release
Page 243 of 258

Page 244

18 
- Website information and FAQs
- Lamppost advertising
- Staff newsletter
- Correspondence with Community contacts
- Councillor Briefing Notes
- Staff training 
- Subject to securing additional funding, the following activities will also take place:
- Direct mail “Your new service” teaser postcard
- Vehicle decals
- Direct mail “Your new service” informational leaflet and collection calendar
- Year one reminder direct mail postcard “remember you can recycle” 
• Roles and responsibilities for delivering the communications: 
- Waste Services produce communications plan in conjunction with ZWS staff
- Waste Services produce communications copy with internal graphic design staff.  
- Drafts approved internally by Head of Services
- Press releases approved internally by Head of Services 
• Use of branding
- The service will adopt the use of the Recycle for Scotland branding for all design materials. Waste Services works with our internal graphic
designer who is familiar with the branding guidelines. The service will access the ZWS image bank as required.
- Corporate brand guidelines will be followed, including the appropriate use of the “oak leaf” logo. 
- If funding for communication materials is secured from Material Focus, material will include their logo and HypnoCat branding. 
Page 244 of 258

Page 245

19 
Promotional activity timeline    
2023 2024/25
Activity  Sub activity Start  End  Jun
e July Aug Sept Oct Nov Q1 Q2 Q3 Q4
Community group
engagement activities
Councillor briefing
note Aug 23 Oct 23          
Website information  Aug 23 Ongoin
g         
Teaser postcard Design and print June 23 July 23           
Booking of
Door2Door mailing
with Royal Mail
June 23 June 23   
Delivery Aug 23 Aug 23          
Lamppost banners. 60
sites across Midlothian. Design and print Aug 23 Aug 23           
Installation Sept 23 Sept 23           
Removal  Oct 23 Oct 23          
Press release  Sept 23 Sept 23          
Your new service leaflet  Design and print July 23 Aug 23           
Booking of mailing
with Royal Mail July 23 July 23           
Delivery Sept 23 Sept 23          
Social media activity  Aug 23 ongoing          
Staff newsletter  Sept 23 Sept 23          
Educational postcard When rejecting
items Oct 23 ongoing          
One year anniversary
reminder postcard.  Design and print Aug 24 Sept 24          
Page 245 of 258

Page 246

20 
Booking of
Door2Door mailing
with Royal Mail
Aug 24 Aug 24   
Delivery Oct 24 Oct 24           
2.4.3 Project Monitoring Template - please use the table below to set out how you intend to monitor the project’s outputs against the predicted
outcomes. 
(Assessment criterion – Impact & Transformation / Evidence Led) 
Predicted Outcomes 
Baseline monitoring data that
outcomes will be benchmarked
against
Post implementation monitoring
used to assess outcome
realisation
Milestone (when
available) Frequency
WEEE and batteries
Increase in materials
collected for recycling
(weight / tonnage)
Previous years collected tonnage
of WEEE and batteries
Calculation of current years
collected tonnage of WEEE and
batteries 
February post
implementation
Annually (Feb) in line with
WasteDataFlow submission
Textiles 
increase in material
diverted to reuse (weight /
tonnage)
Previous years collected tonnage
of textiles 
Calculation of current years
collected tonnage of textiles 
February post
implementation 
Annually (Feb) in line with
WasteDataFlow submission 
Page 246 of 258

Page 247

21 
Section 3: Project Financing 
This section covers the financing of the project, including local authority funding, partner funding and the
funding requested from the RIF. It includes questions regarding longer term project viability and the supporting
revenue costs.
In all responses, please reference any delivery partners that may be involved in the project and any financial
contributions they are making.
Please read through the whole section and accompanying Guidance Document before completing, to
avoid duplication of information.
3.1 Additionality – in this section please detail how the RIF contributes to the financial deliverability of the
project.
3.1.1 Please provide details of why RIF funding is required to enable the project to proceed as
planned. Please also provide information on other funding sources that have been investigated,
whether this has been successful or not, and the amount/s secured from each funding source. 
(Assessment Criterion – Additionality)
Due to ongoing pressures on the Council budget, without funding Midlothian Council does not have the
necessary capital resources to procure a forklift or to retrofit the six food waste collection vehicles to allow us to
undertake the project proposed. 
3.1.2 Please explain what would happen if RIF funding was not secured in the short, medium and
longer term, or if the amount you are offered is less than the amount you have requested. 
(Assessment Criterion – Additionality)
As Midlothian Council does not have the capital budget to finance the procurement of the items requested, the
project would not go ahead as proposed.
3.1.3 Please describe in detail, if relevant, how the project expects to generate any income or
savings.  
(Assessment Criterion – Feasibility) 
a) please explain how the income/savings will be generated
- There is currently no income received from the recycling of WEEE or textiles, and no cost to the
Council in facilitating these collection services. As part of this project, textile reprocessors will be invited
to tender for the textiles unsuitable for reuse collected as part of the kerbside collection service. There
may be an income available for this stream. 
- Any reduction in residual waste will reduce the costs associated with the processing (EfW) of this
material ie: black bag waste collected in grey wheeled bin. 
b) please specify where the income/saving is expected to come from (i.e. who will pay?) 
- A price per tonne could be paid for receipt of kerbside collected textiles. This would be paid by the
winning contractor of any competitive tendering process. 
- A saving may be expected in the waste disposal budget. 
c) please quantify the income/saving you are expecting in a simple forecast; and 
- The MRW price range of textile bank collected textiles in March 2023 was £145-200 / tonne. As this
project intends to collect “rags” not suitable for reuse, a price in the region of half of these values is
more likely to be paid. 
Page 247 of 258

Page 248

22 
As detailed in section 2.2.1 a diversion of between 280 - 660 tonnes of textiles may be achieved. 
280 tonnes x £72.5/t = £20,300 per annum
660 tonnes x £100/t = £66,000 per annum 
An income of between £20,300 and £66,000 may be achieved. 
- Between 74 and 116 tonnes of small WEEE could be collected per annum. Along with the textiles, this
gives a potential diversion tonnage of between 354 and 776 tonnes. At an approximate cost of £90/t for
disposal, a disposal saving between £31,860 and £69,840 could be achieved in addition to the
estimated income above. 
d) please explain whether the income/saving is incorporated within the on-going revenue costs of the scheme,
and, if so, please provide details. 
- Any income received or disposal saving realised will not be retained by Waste Services and
incorporated into the on-going revenue costs of the scheme. Midlothian Council will use any income
received for wider Council budget setting purposes. 
3.2 Capital and other one-off project costs funded by the RIF – please outline the RIF funding required for
the project. Please refer to the Guidance Document for items that are within scope of the Fund. Please add
lines and number sequentially as required. 
(Assessment Criterion – Feasibility) 
Note: Q2 – Capital items expected to be procured in Q2 (July-August-September) for service commencement
from Q3 – October 2023. 
Item no. Year and quarter
of planned
expenditure 
Capital costs 
Item description 
Cost 
(excl. VAT) 
£
C1 2023/24
Q2
2.5 ton LPG forklift with 360 degree fork rotator
Supplier quote £30,500. 10% contingency added. £33,550.00
C2 2023/24
Q2
Retro-fit storage space on existing food waste
vehicles including installation of new door. A cost
in the region of £5,000 per vehicle x 6 vehicles is
expected. 10% contingency added.
£33,000.00
C3 2023/24
Q2
Heavy-duty SL pallet container with runner base
and solid sides with load capacity of 500kg.
L800mm, W600mm, H520mm.
£168 x 9 including three spare £1,512 (discount
applied for quantity ordered) including delivery.
10% contingency added.
£1,663.20
C4 2023/24
Q2
Bespoke lockable metal battery box with chute
aperture. Purchase price £205. 10% contingency
added. Nine, including three space, to be procured.
£2,029.50
C5 2023/24
Q2
1.5 of full load (4,554 units) of 44L kerbside box @
£5.34 plus 10% contingency. £26,750.20 
Total capital costs  £96,992.90 
Page 248 of 258

Page 249

23 
3.3 Capital and other one-off project costs, not funded by the RIF - use the table below to outline the one-
off implementation costs associated with the project. Please add lines and number sequentially as
required. 
(Assessment Criterion – Feasibility) 
Item no./  Year and quarter
of planned
Expenditure 
Item description  Budget
Secured
Cost
(excl.
VAT) £ 
R1 2023/24
Q2 and Q3
Communication plan delivery costs,
including lamppost banner advertising,
teaser postcards informational leaflet. 
Maximum project funding of £0.50 per hh of
£22,030 requested from Material Focus. If
funding is not successful, a reduced
communications campaign will take place. 
Requested
from
Materials
Focus. 
Decision due
end May
2023.
£22,030 
R2 Ongoing LA staff time in preparing funding bids,
procurement and tendering exercises, route
planning, design and delivery of
communication activities, staff training,
staffing of vehicle, vehicle servicing,
maintenance and fuel, financial
administration, waste data collection and
reporting, customer liaison.
From existing
Council staff
and revenue
resources 
£0   
Total project support and development
costs 
£22,030 
3.4        Value for money, budgets and on-going costs - in this section please provide detailed information
on how the above costs were arrived at and how the on-going costs will be managed.
3.4.1 Overall value for money – please describe the process you went through to determine that the project
achieves value for money.
(Assessment Criteria – Impact and Transformation)
A desktop research exercise into how textiles and small WEEE could be collected at the kerbside took place
with vehicle manufactures invited to provide additional information.
• Retro-fitting existing vehicles with cages was considered but rejected due to concerns relating to
vehicle and pedestrian safety concerns if the manufactured safety bars were altered.  
• Our preferred option would be a multi-compartment dedicated kerbside collection vehicle for glass,
small WEEE, batteries and textiles. Unfortunately the market does not have a suitably small vehicle
available for this purpose.
• Multi-stillage vehicles were considered, but these were not deemed suitable, from a noise nuisance
perspective, if textiles and small WEEE were collected alongside glass. Capacity issues were also a
concern.
To avoid a “separate pass” in collecting small WEEE and textiles, one of our existing vehicles would have to be
utilised, and the storage space behind the crew-cab of the food waste vehicles was considered potentially
suitable.
Whilst it could be relatively easy to “load” this space with small WEEE and textiles, unloading it would be more
problematic, especially due to the Health and Safety implications associated with the risk of sharps injuries
from the manual handling of broken WEEE. 
Page 249 of 258

Page 250

24 
To address this issue, it is proposed that small WEEE and textiles are collected in the vehicle in a pallet box.
This allows small WEEE to be mechanically unloaded.
To allow textiles, batteries and small electrical appliances to be collected at the kerbside without the need for a
“separate pass”, the one-off capital costs of retrofitting our existing food waste vehicles for this purpose, plus
the capital costs of pallet boxes and a forklift truck to allow the material to be unloaded from the vehicle
demonstrate that the project achieves value for money. 
To aid visibility for collection crews, as well as address concerns over litter, flytipping and potentially anti-social
behaviour, customers will be requested to present textiles, small WEEE and batteries adjacent to their food
waste caddy within a plastic box. Their existing kerbside glass box is considered suitable for this purpose,
especially with collection frequencies for glass packaging expected to reduce following the introduction of the
DRS. Funding is requested for a small supply of boxes (10% of 44,061 households) to assist residents who do
not currently have a plastic box suitable for this purpose – or who are not currently participating in the kerbside
glass collection service. These will be available on request, and their provision advertised in communication
material associated with the publicity of the service. 
Funding for a secure metal container to collect batteries is also requested. 
On-going revenue costs will be funded from existing Waste Services budgets. 
3.4.2 Costs, procurement and value for money - for each line of project costs in section 3.2, please
explain, in the table below a) how the costs have been estimated; b) how the item(s) will be
procured; and c) what measures will be taken to ensure value for money when procuring. 
(Assessment Criterion – Feasibility) 
Item
no.
Explanation for cost, procurement and value for money 
C1 a) Supplier quote
b) The Project Officer will raise a request for a Purchase Order (PO) to our incumbent
supplier. Once the request is authorised by a senior officer, a PO will be generated and
passed to the supplier. When goods are received, this is recorded and allows the
invoice to be receipted against the PO and payment to be made – in line with standard
Council financial regulations. 
c) The forklift will be procured in line with Council procurement rules and financial
regulations to show transparency and provide best value for money. 
C2 a) A local mechanical engineering company was invited to suggest possible and best
options for retrofitting the cabinet behind the crew cab on the food waste vehicle. Due
to the timescale between vehicle delivery and the deadline for this application, there
has been limited time for the supplier to produce a detailed specification and costing for
the work involved however, based on initial conversations, the retrofitting costs per
vehicle are expected to be in the region of £5,000 ea.
b) The Project Officer will raise a request for a Purchase Order (PO). Once the request
is authorised by a senior officer, a PO will be generated and passed to the supplier.
When goods are received, this is recorded and allows the invoice to be receipted
against the PO and payment to be made – in line with standard Council financial
regulations. 
c) Mechanical engineering work will be procured in line with Council procurement rules
and financial regulations to show transparency and provide best value for money.
C3 a) Market analysis. 
b) Following market research of the options available, a sample box has already been
procured and will be tested to ensure it is suitable for the project. An online purchase of
the project funded boxes will be made by The Project Officer with an invoice requested
from the supplier. Upon receipt of delivery the invoice will passed for payment – in line
with standard Council financial regulations for one-off purchases at this value.
c) Pallet boxes will be procured in line with Council procurement rules and financial
regulations to show transparency and provide best value for money.
Page 250 of 258

Page 251

25 
C4 a) Supplier quote. Following market research of the options available, the manufacturer
of a multi-stream kerbside sort vehicle was approached regarding provision of a
dedicated box for the collection of batteries. Midlothian has investigated use of this
particular model being used for this purpose in a neighbouring authority.
b) The Project Officer will raise a request for a Purchase Order (PO). Once the request
is authorised by a senior officer, a PO will be generated and passed to the supplier.
When goods are received, this is recorded and allows the invoice to be receipted
against the PO and payment to be made – in line with standard Council financial
regulations. 
c) Battery boxes will be procured in line with Council procurement rules and financial
regulations to show transparency and provide best value for money.
C5 a) Scotland Excel framework
b) The Project Officer will raise a request for a Purchase Order (PO). Once the request
is authorised by a senior officer, a PO will be generated and passed to the supplier.
When goods are received, this is recorded and allows the invoice to be receipted
against the PO and payment to be made – in line with standard Council financial
regulations. 
c) The kerbside boxes will be procured in line with Council procurement rules and
financial regulations to show transparency and provide best value for money. 
3.4.3 Cost increases - please provide information on how you will manage any cost increases above your
estimates, for the assets applied for. 
(Assessment Criterion – Feasibility)
Prices will be confirmed with suppliers before orders are placed. A 10% contingency has been added to the
supplier quotes received.
3.4.4 On-going revenue costs – please provide an overview of the implications of ongoing revenue costs
resulting from implementation of the proposed project and provide confirmation that the authority has
gained approval, or is seeking approval, for any new revenue costs. 
(Assessment Criterion – Feasibility)
• Staffing: included in existing waste collection service staffing budget 
• Overheads: included in existing waste / recycling collection service budget 
• Vehicles: included in existing waste collection service budget 
• Travel and fuel: included in existing waste collection service budget 
• Promotion, advertising and media: From Year 1, included in existing waste collection service budget 
• Reporting and project management: included in existing waste / recycling collection services staffing
budget
3.4.5 Asset allocation and depreciation – please provide details of how existing assets are to be used to
deliver the project, if applicable, and how the applied for assets, funded through the RIF, will
complement or replace these existing assets and why. 
(Assessment Criterion – Feasibility) 
The storage compartment of six existing food waste collection vehicles will be retro-fitted to allow for the
kerbside collection of small WEEE and textiles. These vehicles have a 7-year replacement timeframe. In
normal use, the new cabinet is expected to have a similar lifetime. 
The forklift truck would be supplied with 2 year/2000 hour warranty. From this time, repairs and maintenance
would be carried out utilising existing Waste Services budgets. The fuel for this vehicle will also be covered by
existing budgets. 
Nine “off the shelf” 600mm x 800mm pallet boxes will be procured. They have a 5-year quality guarantee.
Lifespan is unknown at this time and will depend on use / misuse by forklift operators. 
Midlothian Council estimates a replacement rate of 10% per annum for kerbside containers due to loss, theft or
damage. 
Page 251 of 258

Page 252

26 
Section 4: Supporting & Supplementary Information 
4.1        Please provide supplementary information in this section to support your application. Please
ensure that you read the Guidance Document before doing so. 
Attachments: 
Forklift
Email from supplier detailing costs and lead time. 
Pallet box
Online shopping basket detailing costs. 
Battery box
Email for supplier detailing costs. 
Page 252 of 258

Page 253

27 
Appendix 1a: Tonnage calculations – Small WEEE and batteries 
Small WEEE       
2022 2021 2020 2019 3 year
average  
Number of households 44,061 43,238 42,655 39,733   
Residual waste tonnage 17,260 18,166 22,215 19,967 19,402         
Based on 2015 waste composition analysis of residual waste:  
% of small WEEE in residual waste 0.65%     
kg/hh/year  3.1              
Capture rate     
80% 70% 60% Calculation details 
Tonnage yield 110 96 82 kg/hh/yr x no hh 2022 x capture rate
% of residual waste stream 101 88 76 % in residual waste x 3 year average weight x
capture rate
Batteries       
Based on 2015 waste composition analysis of residual waste:  
% of batteries in residual waste 0.02%     
Capture rate     
80% 70% 60% Calculation details 
3.10  2.72  2.33 
% in residual waste x 3 year average weight x
capture rate 
Page 253 of 258

Page 254

28 
Appendix 1a: Tonnage calculations – Textiles 
Number of households         44,061  
% of textiles in residual waste (from WCA) 3.38% 
3-year average residual tonnage         19,402  
Potential textile tonnage in residual waste 655.8
Contamination
20%
80% capture 525 373
70% capture 459 327
60% capture 393 280   
Estimated kg/hh/yr (from WCA) 23.4 
Estimated tonnage of textiles (kg/hh/yr x no hh)           1,031 
Contamination
20%
80% capture 825 660
70% capture 722 577
60% capture 619 495 
Page 254 of 258

Page 255

29 
Appendix 2: Carbon calculator 
Material type (WSR) Carbon factor for
Household waste
RECYCLED (kgCO2eq per
tonne of material)
Additional
household material
RECYCLED (tonnes)
Carbon factor for
Household waste
INCINERATED (kgCO2eq
per tonne of material)
Additional household
material diverted from
INCINERATION (tonnes)
Total carbon impact of
household diversion
(tCO2e) 
Batteries and accumulators wastes -579 2   2 -1
Discarded equipment (excluding
discarded vehicles, batteries and
accumulators wastes)
-181 93 41 93 -21
Textile wastes -5,828 470 216 470 -2,841
TOTAL   565   565 -2,862.5 
Page 255 of 258

Page 256

30 
Section 5: Confidentiality and Declaration 
Confidentiality and Privacy 
Please note that Zero Waste Scotland is required to share your application with the Recycling Improvement
Fund Board (Scottish Government, Zero Waste Scotland SOLACE, SEPA and COSLA) to enable the
application to be assessed and to facilitate management of the fund.  By completing this form, you permit
the sharing of information for this purpose. 
Information that you provide to Zero Waste Scotland will be treated in the strictest of confidence and in line with
all information regulations, except when we are required to disclose data by law or applicable regulatory
requirement, including any disclosure required under the Freedom of Information (Scotland) Act 2002 and/or
any code or applicable data agreement relating to disclosure and access to information held by public bodies. 
Zero Waste Scotland is committed to protecting and respecting your privacy. Our privacy policy
http://www.zerowastescotland.org.uk/content/privacy-policy explains how we collect and process your personal
information for funding and support applications. If you have any requests concerning your personal information
or any queries with regard to our processing practices, please contact us at data@zerowastescotland.org.uk . 
All information provided to ZWS will held for the statutory period of 6 years. You may unsubscribe from and
request to no longer receive product and service information from us at any time by emailing
communications@zerowastescotland.org.uk . 
Declaration 
I declare that: 
The information given on this form and in any other documentation is accurate to the best of my knowledge.  I
understand that, where any materially misleading statements (whether deliberate or accidental) are given at any
stage during the application process, or where any material information is knowingly withheld, this could (at the
discretion of Zero Waste Scotland) render my application invalid and any funds received by us will be liable for
repayment. 
I confirm that my organisation will take all reasonable precautions to ensure that any funding received will not
be misused or misappropriated in any way.  In the event of a fraud, I understand that Zero Waste Scotland may
take legal action to recover any misappropriated funds.  I confirm that the project would not proceed in the
absence of this grant. 
I agree that the information supplied on this form, including individual contact information, will be used to chart
the success of the project and for Zero Waste Scotland monitoring purposes. 
To be signed by a Senior Manager with relevant delegated authority (for example Chief Officer)
Signed: 
Print Name: Derek Oliver 
Position: Chief Officer - Place
Contact email address and
phone number:
0131 271 3418
derek.oliver@midlothian.gov.uk
Date: 26 April 2023
Page 256 of 258

Page 257

31 
Section 6: Application Form checklist 
Please take a few minutes before you submit your application to run through this checklist. 
Application sections / requirements Completed / Included 
(Check as appropriate)
Application and Guidance Document read in full R
Application scoped and developed with ZWS Recycling Partner R
Completed local authority details (Section 1) R
Provided a short (500-word maximum) project summary (2.1) R
Completed the detailed project information sections (2.2.1 – 2.2.8)
– including detailed methodology and workings  R
Project approvals, permissions and consents completed (2.3.1 –
2.3.3) R
Project timetable template completed (2.4.1) R
Outline communications plan completed (2.4.2) R
Project monitoring template completed (2.4.3) R
All finance section questions answered (3.1, 3.2 & 3.5) R
Capital and other one-off project costs funded by the RIF (3.3) R
Capital and other one-ff project costs not funded by the RIF (3.4) R
Supplementary information (4.1) R
Confirmation that the Application confidentiality and declaration
section has been read and understood (Section 5) R
Application signed by senior manager with relevant authority R
Completed application submitted with approval from ZWS
Recycling Partner R 
Page 257 of 258

Page 258

Page 258 of 258