Page 1

Notice of Meeting and Agenda 
Cabinet 
Venue:  Council Chambers, 
Midlothian House, Dalkeith, EH22 1DN 
Date:  Tuesday, 29 November 2022 
Time:  11:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services 
Clerk Telephone: 
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk 
Page 1 of 100

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item
and the nature of their interest. 
4          Minute of Previous Meeting
4.1 Minute of Cabinet - 18 October 2022 Submitted for approval 3 - 6
4.2 Action Log 7 - 8 
5          Public Reports
5.1 Inspection of Newbyres Village Care Home, Report by Joint
Director Health and Social Care Partnership
9 - 12
5.2 Adult Health and Social Care Performance Report Quarter Two
2022/23
13 - 18
5.3 Children Service, Partnership and Communities Performance
Report Quarter Two 2022/23
19 - 26
5.4 Corporate Solutions Performance Report Quarter Two 2022/23 27 - 44
5.5 Education Performance Report Quarter Two 2022/23 45 - 62
5.6 Place Performance Report Quarter Two 2022/23 63 - 80
5.7 Midlothian Council Report Quarter Two 2022/23 81 - 88
5.8 Balanced Scorecard Indicators Half Year Report 2022/23 89 - 100 
6          Private Reports 
None 
7          Date of Next Meeting 
The next meeting will be held on Tuesday 17 January 2022 
Page 2 of 100

Page 3

1-1  Cabinet
Tuesday 29 November 2022
Item 4.1  
Minute of Meeting 
Cabinet 
Date Time Venue
Tuesday 18 October 2022 11.00 am Council Chambers,
Midlothian House,
Buccleuch Street,
Dalkeith 
Present: 
Councillor Parry (Convener)  Councillor Cassidy
Councillor McKenzie Councillor Scott 
Religious Representatives: 
Ms Elizabeth Morton Ms Anne Theresa-Lawrie 
In attendance: 
Dr Grace Vickers, Chief Executive
Kevin Anderson, Executive Director Place
Fiona Robertson, Executive Director Children, Young People and Partnerships
Morag Barrow, Joint Director Health and Social Care
Derek Oliver, Chief Officer Place
Alan Turpie Legal Services Manager/Monitoring Officer
Martin Bonnar, Manager, Midlothian and East Lothian Drug and Alcohol Partnership
Andrew Henderson Democratic Services Officer 
Page 3 of 100

Page 4

1 Welcome, Introductions and Apologies 
Councillor Parry welcomed those in attendance to the meeting of Cabinet. Apologies
were then noted on behalf of Councillor Alexander and Councillor Bowen. 
2 Order of Business 
The Order of Business was as detailed within the Agenda. 
3 Declarations of interest 
No declarations of interest were received. 
4 Minutes of Previous Meetings 
4.1 The Minute of the Meeting of the Cabinet held on the 18th of October 2022 was
submitted and approved as a correct record. . 
4.2 The Action Log of Cabinet was submitted and noted, Kevin Anderson provided
a further update in relation to action point 1 confirming that a briefing had been
arranged for the afternoon of Tuesday 1st of November via MS teams. 
5.  Reports 
Agenda No. Report Title Presented by:
5.1 Medication Assisted Treatment (MAT)
Standards Implementation in Midlothian
Joint Director Health
and Social Care
Outline of report and summary of discussion
Morag Barrow provided a brief overview of the report, referencing that it been
signed off by the Midlothian Integration Joint Board and NHS Lothian and would
now be submitted to the Scottish Government. Cabinet agreed to note the report. 
Decision
Cabinet noted the contents of the report. 
Agenda No. Report Title Presented by:
5.2 Education Standard & Quality Report
2021-22 and Local Improvement Plan
2022-23 
Executive Director
Children Young People
and Partnerships
Outline of report and summary of discussion
In speaking to the report Fiona Robertson made specific reference to section 3 of
the report and outlined that progress had been made with improvement priorities
2021/22 and this throughout the difficult pandemic period, in particular the
successful rollout of digital devices ahead of schedule. Fiona Robertson made
further reference to the 4 key areas of improvement and acknowledged that a
separate report would be submitted to the relevant performance committee. 
Responding to comments regarding feedback from pupils and teachers in relation
to digital devices, Fiona Robertson confirmed that phase 2 had started and that she
was due to attend a learner conference and would be able to provide further
Page 4 of 100

Page 5

feedback following this. Members then took opportunity to reiterate the importance
of ensuring learners are included in the feedback. 
Decision
a) Cabinet approved the Education Local Improvement Plan 2022-23 as
outlined in Appendix 1. 
Agenda No. Report Title Presented by:
5.3 South East Improvement Collaborative
(SEIC) Improvement Plan
2022-2023
Executive Director
People and
Partnerships
Outline of report and summary of discussion
Fiona Robertson provided a brief overview of the South East Improvement
Collaborative (SEIC) Improvement Plan 2022-2023 and highlighted that she was
also in engagement with schools in the north of England on account of the
successes of the SEIC. Members then took the opportunity to congratulate Fiona
Robertson for the success and the interest from other authorities in the project. 
Decision
a) Cabinet noted the SEIC Regional Improvement Plan August 2022-23 as
outlined in Appendix 1 and;
b) Noted the priority areas for improvement being taken forward in partnership
with members of the SEIC and the progress made towards improving
professional collaboration and school empowerment across the SEIC. 
Agenda No. Report Title Presented by:
5.4 Midlothian Families Project Chief Officer Place
Outline of report and summary of discussion
With reference to the report Derek Oliver outlined that in order to comply with the
revised Homeless Persons (Unsuitable Accommodation) (Scotland) Order 2020
Midlothian Council would require accommodation available to families for
emergency use and highlighted that this would help with the target of ending the
use of B&B accommodation and provide greater safety measures to those at risk.
Members took the opportunity to thank officers for their work on the project. 
Decision
a) Cabinet approved the use of the building as referenced to provide short term
emergency accommodation to homelessness households with children or a
pregnant person and; 
b) Approved funding the setting up of Midlothian Families Project project
through the Ending Homeless Together Funding. 
Agenda No. Report Title Presented by:
5.5 Midlothian Council Statutory Report to
Scottish Ministers on Public Bodies
Climate Change Duties 2021/22
Chief Officer Place
Outline of report and summary of discussion
Derek Oliver provided a brief overview of the report outlining that it would need to
be submitted by the end of November and highlighted that whilst the report was
embedded within the services of the place directorate this would be a cross council
Page 5 of 100

Page 6

effort. Derek Oliver then took the opportunity to respond to members questions. 
Derek Oliver agreed to come back with further information with regard to the swing
in diesel emissions from May 2022 where it had been indicated that Midlothian
Council were on target whereas it had that Midlothian Council was now over target.
Derek Oliver further highlighted that the Use and size of fleet had increased
through hire of vehicles during covid to public health guidelines, the reduction going
back to pre covid levels is being phased in. 
Derek Oliver continued to respond to further points of clarity, confirming that hire
vehicles had been used to augment vehicles during the covid pandemic and that a
number are still being used by Building Maintenance Services and that this is being
examined as part of the building maintenance service review. In relation to ethical
and environmental impacts of electric vehicles Derek Oliver clarified that Midlothian
Council was subject to Scottish Government policy to mitigate the use of fossil fuel
vehicles and that whilst heavier vehicles utilised hydrogen as a fuel source work
was being done to assess how electricity and hydrogen could be attained. 
In responding to comments regarding the governance and scrutiny arrangements
and the risk with regard to loss of funding streams, Derek Oliver confirmed that
climate change was a major component of the Business Transformation Steering
Group and that the Climate Change Board offered an opportunity for further
governance and scrutiny. Derek Oliver further highlighted that there are currently
several funding streams available and that Midlothian Council was active in
applying for them. 
Decision
a) Cabinet approved the Council’s Report on Compliance with the Public
Bodies Climate Change Duties for 2021/22 and;
b) Agreed to the submission of the report to Scottish Ministers by 30 November
2022 and; 
c) Chief Officer Place agreed to provide an update in relation to the increase in
Diesel emissions from May 2022 to October 2022. 
6 Private Reports 
No items for discussion. 
7 Date of the Next Meeting 
The date of the next meeting was noted as Tuesday 29 November 2022 at 11 am. 
The meeting terminated at 11.25 pm
Page 6 of 100

Page 7

Cabinet: Tuesday 29 November 2022 
Action Log 
No Subject Date Action Action Owner Expected
completion
date
Comments
1 Irrecoverable Debt
Write Off
08/03/2022 To invite the appropriate
officers of City of Edinburgh
Council to attend a future
briefing to provide clarification
on the Debt Collection
process.
Chief Officer:
Corporate
Solutions 
Ongoing Complete, briefing with
representative from CEC held
on 01/11/2022.
2 Midlothian Council
Statutory Report to
Scottish Ministers on
Public Bodies Climate
Change Duties
2021/22
18/10/2022 Update to be provided in
relation to the increase in
diesel emissions from May
2022 to October 2022.
Chief Officer
Place
29/11/2022 
Cabinet
Tuesday 29 November 2022
Item No: 4.2 
Page 7 of 100

Page 8

Page 8 of 100

Page 9

Inspection of Newbyres Village Care Home
Report by Morag Barrow, Joint Director Health and Social Care Partnership
1 Purpose of Report
This report provides an overview of the resent unannounced care
inspectorate report for Newbyres Village Care Home.
2    Background
2.1 Midlothian Health and Social Care Partnership’s Newbyres Care Home
was inspected on by the Care Inspectorate as a 
registered care home for people aged over 60.  Newbyres Care Home 
provides long term care for 61 residents.  The home is laid out across 
five streets all with separate lounge and dining areas.   There is a
shared kitchen and laundry.   The care home was inspected across the
6th/7th September 2022 and on with the report published on the16th 
September 2022.
The inspection format was undertaken under Care Inspectorate Heath
and Social Care standards for care homes. 
2.2 Following the recent inspection a report was published that details the
areas of its findings and outlines areas for recommendation and/or
requirements. 
The inspection report grades the areas of inspection from 1
(Unsatisfactory) to 6 (Excellent). This inspection report graded the
three areas as follows: 
How well do we support people’s wellbeing?    3   Adequate  
How good is our leadership?  3 Adequate
How good is our staff team?  3 Adequate
How well is our setting?    4 Good   
How good is our care and support planned?  4    Good
2.3     Key messages from the report:
• Staff displayed a strong sense of their duty of care towards people.
• When staffing was consistent, they were knowledgeable about
people's support needs.
• There was a programme of activities with a good balance of one to
one and group events
• Domestic staff worked hard to keep people's bedrooms and
communal areas clean.
Cabinet
Tuesday 29 November 2022
Item 5.1
Page 9 of 100

Page 10

• The staff team had embraced the Open with Care visiting guidance 
from the Scottish Government, recognising visits were essential for 
the wellbeing needs of people.
• Improvements were needed to ensure people received their
medication as prescribed and errors were minimised.
• The effectiveness of quality assurance and management oversight 
required improvement to ensure people experienced positive 
outcomes 
2.4 Areas of improvement noted at time of inspection are: 
1. The provider should ensure that care staff are appropriately trained
to meet the moving and handling needs of people and that this is
delivered in a safe manner. This practice should also be
underpinned through observation of practice by management. This
is to support the ongoing development of staff, ensuring they are
competent, skilled, and able to reflect on their practice to continue
to meet people’s needs.  
2. The provider should ensure that there is a structured team meetings
and support and supervision system in place for staff (which
incorporates observations and reflections of practice). This is to
support the ongoing development of staff, ensuring they are
competent, skilled, and able to reflect on their practice to continue
to meet people’s needs.
3. The provider should ensure people's care planning documentation
is reviewed on a regular basis and the systems and processes used
by staff reflect this in a consistent way. 
2.5 There were areas of requirement highlighted in report around the need
for regular audit cycles, and the need to have action plans in place for
any areas identified as requiring development from audit outcomes.  
Infection control practices were also highlighted as requiring additional
attention. 
2.6      Actions taken in response to inspection:
• Review of staff supervision processes to ensure both regular
individual and group supervision sessions.
• Documented Shift handovers, including actions required to
enhance communication around care provision and information
sharing.
• Working with Moving and Handling co-ordinator to undertake
observations of practice. review of training records.
• Medication training supported by Omnicare and review of
medication procedures and audit cycle processes 
• Implementation of new documentation with a monthly audit
cycle.
Page 10 of 100

Page 11

• Reviewed process of escalation of actions from audits to senior
management team.
2.7      Complaints: There have been not complaints since the last inspection 
3         Conclusion
The Care Inspectorate reported in their findings from visiting clients and
speaking to family members that people said the responses they
received were positive.
inspection report
4 Report Implications 
4.1 Resource 
There are no financial and human resource implications associated with
this report. 
4.2 Risk 
The Care Inspectorate inspect all registered services on a regular basis
with announced and unannounced inspections. A report is published
which informs all stakeholders about the key strengths of the service,
areas for improvement and sets out the main points for action. 
Following the publication of that report it is accessible to the public via
the Care Inspectorate website, and by requesting a hard copy. It is also
on display in the Care at Home base for staff and visitors to access and
review progress. 
4.3 Policy 
Strategy 
There is now a total of one recommendation from the recent inspection
and 5 area for improvement – 
Newbyres Village Care Home has responded to the inspection with a
comprehensive action plan, with clear timescales and outputs to deliver
to the plan. 
Support to achieve the action plan is being provided by Midlothian
HSCP lead pharmacist and care home support team.   Oversight
assurance for the action plan is in place via Midlothian HSCP clinical
and care governance group. 
Consultation: 
Copies of the Inspection report have been made available to Elected
Members, and staff members, and notified to families/carers and other
interested parties. 
Page 11 of 100

Page 12

Equalities
There are no apparent equalities issues.
5 Technology issues
There are no Technology issues arising from this report.
6 Recommendations
The Cabinet is asked to:
(i) Note the content of the report and progress made and forward to
Performance Review and Scrutiny Board
9th November 2022
Report Contact: Grace Cowan
grace.cowan@midlothian.gov.uk
Page 12 of 100

Page 13

1
Adult Health and Social Care
Performance Report Quarter Two 2022/23
Progress in delivery of strategic outcomes
Our Vision: People in Midlothian are enabled to lead longer and healthier lives.
Our Values: Right support, right time, right place.
Midlothian Integration Joint Board plan and direct the services that are delivered by Midlothian Health and Social
Care Partnership (HSCP). The HSCP is a partnership between NHS Lothian and Midlothian Council and is
responsible for services that help Midlothian residents to live well and get support when they need it. This includes
all community health and social care services for adults in Midlothian and some hospital based services such as
Accident and Emergency.
In order to meet the legal requirements of the Public Bodies (Joint Working) (Scotland) Act 2014, the HSCP was
required to develop, consult on, and publish a new 3 year Strategic Plan in 2022. The new Strategic Plan for 2022-
25 was published in April 2022.
HSCP COVID-19 Response
The Health and Social Care Partnership, its partners and the communities it serves continued to be impacted by the
COVID 19 pandemic, although restrictions are now eased, Scotland has seen an increase in the number of positive
cases (1 in 45) compared to the last quarter (1 in 95). As we approach winter, our strongest mitigation against covid
remains our vaccination programme. The Midlothian Health and Social Care Partnership Vaccination Plan has been
presented at our Senior Management Team and is included in our Winter plan. We continue to work with our
partners to support staff where required and ensure our service delivery is not impacted by deploying staff to cover
absences where needed. As we progress into the next quarter and Winter, a strong focus on workforce is included in
the Winter Plan.
Seasonal Flu/COVID Booster Programmes
The Midlothian vaccination team have responsibility for all vaccinations that were part of the Vaccination
Transformation Programme from the GP’s to the HSCP.
In accordance with JCVI Guidance on the covid booster vaccine our Flu/Covid booster vaccination programme is
progressing well across the cohorts. Scheduled meetings take place to review our action log and track progress.
Vaccine supply for Covid + Flu is currently good and is continuously being monitored.
The next cohort to be invited to receive their seasonal Flu and Covid booster vaccinations is the 50 – 64 cohort,
while the Flu vaccine is currently being rolled in schools by the Community Vaccination Teams.
Activity being progressed as part of our inclusivity programme include conversations to connect with Ukraine and
Afghan refugees placed in Midlothian, and the rollout of vaccinations within Hostels. The sharing of information with
foodbanks within Gorebridge/Penicuik regarding clinics is taking place. Both have accessible venues to the users of
the foodbanks.
Service Transformation
On 20 June 2022 the Scottish Parliament published the National Care Service Bill which will provide the foundation
for the NCS. Alongside the Bill, explanatory notes, a policy memorandum, a financial memorandum and a delegated
powers memorandum were also published. The first stage of the consultation was concluded in early September and
we await the outcome of that.
Justice
We have continued to liaise with key partners (Courts and other Local Authorities) regarding the uptake of bail
services which has been a nil return in orders being imposed at Court. Requests for assessments are being
processed through notification of bail opposed lists but clients are either not in agreement to the assessment or,
Cabinet
Tuesday 29 November 2022
Item 5.2
Page 13 of 100

Page 14

2
more often than not, the Court is proceeding without formally requesting it. From communication with other areas we
are aware that it is a similar picture nationally and we are feeding this back to colleagues in Scottish Government. 
The Justice Service have continued to manage the unpaid work hours. The term backlog was initially used in
reference to unpaid work hours during Covid when unpaid work delivery was suspended in line with national
restrictions and therefore for a period of time no hours were completed. The term backlog is somewhat misleading;
as soon as a court imposes a CPO with ‘Unpaid work or other activity’ requirement the hours are outstanding until
the client completes them. Midlothian have no orders in backlog and we were one of the first local authorities able to
re-instruct clients to attend groups as soon as easing of restrictions permitted it. We were in part able to manage this
due to a very motivated staff team and the work of the line managers in developing Covid risk assessments. 
The team work closely with partner agencies to ensure that we are able to meet the needs of service users in terms
of re-integration and rehabilitation but also serve the communities that have been most affected by crime. The
Unpaid Work team has continued to develop and implement training pathways for clients undertaking an Unpaid
Work Requirement. This starts with all clients completing SCQF award at level 4 in Health & Safety as part of their
standard induction onto the Order. Clients have opportunity to undertake further SCQF qualifications including: First
Aid, Advanced Health & Safety Training and Manual Handling. Working with the Community Lifelong Learning Team
a further pathway has been developed for clients to undertake a variety of training courses including; an Adult
Achievement Award, CSCS Card, Digital Skills, An Introduction to Wellbeing or to undertake work improving their
literacy and numeracy Skills. 
Substance Misuse 
Key services based in Number 11 in Dalkeith continued to provide services including outreach treatment, injecting
equipment provision [IEP], naloxone, and information/advice. Currently, there are challenges with recruitment.
However, the Midlothian Substance Use Service continues to support and treat those individuals who are most at
risk. This includes the provision of Buvidal [an injectable form of Buprenorphine].The caseload of the SUS service in
Q2 averaged around 340. As a proxy measure, this indicates that at any given point, 340 people were provided
treatment and support as a protective factor in minimising harm. Despite pressure on capacity due to recruitment
challenges and consistently high number of people being treated, the service was able to deliver rapid access to 6
new patients. Staff recruitment to employ 2 Non-Medical Prescribers has been completed. Other recruitment to new
nursing and 3rd sector posts are underway. These posts augment service capacity to deliver the Medication
Assisted Treatment Standards. 
Naloxone 
Accidental overdose is a common cause of death among users of heroin, morphine and similar drugs, which are
referred to as opioids. Naloxone is a drug which temporarily reverses the effects of a potentially fatal overdose with
these drugs. Administering Naloxone provides time for emergency services to arrive and for further treatment to be
given. Services and MELDAP have continued the roll out of training and providing ˜Take Home Naloxone” kits
(hereafter referred to as THN) or Nyxoid [Nasal Spray]. These are issued to people at risk of opioid overdose, their
friends and family and service workers in order to help prevent overdose deaths. Any member of the public over the
age of 16 can be trained in the use of Naloxone allowing them to carry and administer it as well as recognise the
signs of someone who may be experiencing an overdose. In a joint initiative with MELDAP, Midlothian Council has
agreed to: 
. Promote Naloxone training and carrying amongst their staff group. 
. Include Naloxone training and carrying with the 1st aid trainers course. 
. Look to try and ensure that there are Naloxone trained members of staff within all public facing buildings where
possible. 
This is voluntary initiative for staff. 
Drug Trends Service staff have provided feedback that the noted previous increase in cocaine use through snorting,
injecting and/or smoking continues. There also continues to be concerns about the availability of “street benzo’s” for
example, illicit Diazepam, Etizolam and Alprazolam [Xanax]. These tablets are likely to be used in conjunction with
other drugs [poly drug use] increasing the level of risk. 
Learning Disabilities
The Complex Care Expert Panel Group which will oversee spending of Midlothian’s Complex Care Community Fund
has now been established and will meet at the end of October to develop the plan for the Midlothian allocation of
Community Change Fund. 
Page 14 of 100

Page 15

3
The Human Rights Expert Panel is now well established, meeting every six weeks, and has developed a programme
of activities and three sessions covering Human Rights, The Charter for Involvement, Recovery from the pandemic
and Communication. 
The flats at Bonnyrigg High Street are scheduled for completion in September 2023. Designs for Primrose Lodge in
Loanhead are complete, but the property is being used to house tenants of Teviot Court whilst their flats are being
upgraded. The first six moves took place on 4th and 5th October and work at Teviot should be completed by
March/April 2023, but outside works are weather dependent. We will reapply for capital funding for the work at
Primrose Lodge once we are confident that Teviot tenants have fixed dates for moving back into their homes, and
that we have full access to the building. 
Older People
Extra Care Housing: As with many other areas, Midlothian faces many challenges in addressing the housing and
care needs of an ageing population with increasingly complex requirements. Extra Care Housing is a model of
accommodation and care that supports people to live in their own tenancy. We have been working to identify the list
of applicants for the facility at Normandy Court Dalkeith, to allow us to identify the level of care provision required for
the facility going forward. The facility is due to come online at the end of March 2023. 
Care Homes: Midlothian has 10 older people’s care homes, 2 of which are HSCP run with one being an intermediate
care facility. The remaining 8 are privately run either by private companies, charitable organisations or independent
care homes. Health Boards and local Health and Social Care Partnerships continue to carry responsibilities for the
clinical and professional oversight of the care provided to people resident in care homes in line with the Scottish
Government guidelines (May 2020). 
Care at Home: During Q2, our internal and external providers delivered ~78,000 care hours for clients in Midlothian.
On average, our internal Care at Home service completed 6,873 visits per week, to an average of 298 clients.
August was our busiest month providing care to 303 clients, and starting 51 new packages of care. During the
quarter Midlothian HSCP continued to work closely with external providers who delivered approximately 51,000 care
hours, or 66% of care hours for the quarter. Audits were completed for external providers, including feedback
gathered directly from clients. Feedback highlighted the preference for regular carers, and the importance of carers’
ability to engage with clients, stating, “The carers are friendly which helps when you have people coming into your
home.” 
Carers
Previously agreed additional resource has been supported by contracts and services should now be in a position to
access this funding. Agreement was reached and amendments made to the existing contract made so that
Alzheimer Scotland will recruit a Dementia Carer Support Practitioner from November. Governance groups within
the HSCP gave support for additional funding to Grassy Riggs to deliver carer support, delivery of which should be
possible with immediate effect. Long-term sickness and staff leaving due to personal reasons resulting in staff
vacancies have impacted VOCAL, and have required alternative approaches to delivery being adopted, e.g.
engaging CAB to support delivery of some welfare rights services. 
Discussions of work to engage with stakeholders and carers re existing strategy; strengthening of services and gaps;
utilisation of underspent and carried forwards carer act funding. Proposal for a plan for funding committal to SMT in
January 2023. Carer Strategy at final stages of being checked for accessibility before aim of sign-off by Chief Officer
and publication online. 
Mental Health
Primary care developments: There has a been a postponement from the Scottish Government regarding the funding
for the Mental Health and well-being Monies, National plans will not progress at this time, awaiting update from
Scottish Government 
Individual Placement Support has been impacted by Covid 19 and subsequently the current post holder has left the
post. This post has unfortunately taken 4 recruitment processes but the post has now been successfully recruited to.
The new member of staff will be commencing employment in October. 
There continues to be strong partnership working between Housing, Health and Social care and third sector
providing support and housing for individuals with complex needs, through the housing first model. 
Page 15 of 100

Page 16

4
Adults with Long Term Conditions, Disability and Impairment 
Awareness training sessions for HSCP staff, provided by Sight Scotland are being planned in light of Covid
Restrictions easing. Sight Scotland continue to provide information sessions to staff in relation to the services they
provide. Meetings are taking place with Deaf Action to review their role and remit in light of their specialist Social
Worker leaving post. 
Volunteers continue to uplift peoples’ faulty hearing aids from their homes and delivered the aids to Midlothian
Community Hospital for an Audiology technician to repair, and then return the repaired aids back to the individuals.
Conversations have started between Audiology, Enable Local Area Coordinators and other relevant parties in regard
to restarting repair clinics in Community Venues, as per pre pandemic. At the request of Audiology they wish to
prioritise the start of an Audiology Clinic in Midlothian Community Hospital first before other options are more
actively pursued. 
Hybrid model up and running for delivery of face to face and digital for all weight management programmes. Digital
devices secured for people referred so they are able to decide what options best suits their needs Improving. 
Midlothian HSCP commenced work on Improving the Cancer Journey (ICJ) during 2021. ICJ is a partnership
between Macmillan and the four Lothian Health and Social Care Partnerships. Midlothian Council hosts the
Programme on behalf of the four HSCPs. The ICJ Programme aims to meet the non-clinical needs of people living
with cancer; it promotes self-management and person-centred solutions. The service in Midlothian has strong links
with the Wellbeing Service in GP practices and the MacMillan Welfare Rights Advisor in the Welfare Rights Team.
The monthly target for the service to see 17 people per month. During Q2 39 people were referred and 27 people
used the service demonstrating a slight increase. Local work continues to focus on primary care engagement with
'tests of change' within 3 GP practices. The other Lothian areas have a dominance of secondary care referrals but in
Midlothian, there is a more even spread across secondary care, GPs, third sector and self-referrals. 
Sport and Leisure 
Gorebridge Leisure Centre: The main hall remedial work is now complete. The works were delayed due to the
ongoing roof replacement programme but the centre will now be able to accommodate a fuller programme. The
centre is being utilised for the winter vaccination programme, on a smaller scale than previously with only the lesser
hall being used. 
Stabilisation in the global supply of chlorine products for swimming pools has meant that all spa pools previously
closed due to low availability of chlorine have now reopened. Swimming pool closures due to lack of chlorine were
avoided during Q2 which previously had looked very likely. 
Active Schools:- 
. Continuing to expand our Active Schools Programme with more free opportunities being offered in schools with a
pathway in place from schools to community & club sport. 
. Young Ambassador Programme: All secondary schools have engaged and have recruited 2 Young Ambassadors
who will work with Active Schools Coordinators to promote sport & physical activity opportunities in schools and work
to identify and address barriers to participation. 
. Fit for Girls Programme: We have established a Fit for Girls Committee who will identify & address barriers to
participation for girls and will work to empower other girls to shape and influence sport & physical activity in
Midlothian. 
. Young People Networking Event: We held a networking event for Midlothian Young People from our Young
Ambassador Programme, Fit for Girls Committee and Active Schools Leadership Academy. This gave the pupils the
opportunity to meet each other, discuss plans for the year and discuss ways that they can work together to promote,
influence and shape sport in Midlothian. . Whole Systems Approach: We have been working with our NHS
colleagues and have created a plan as part of the type 2 diabetes, Whole System Approach programme. This
project will run in the Easthouses/Mayfield area addressing inequalities in accessing sport & physical activity. Child
Healthy Weight Programme: Along with our Active Schools colleagues (East, West, Edinburgh & Midlothian) and
NHS colleagues we have finalised plans and launched the child healthy weight programme. This is a referral
programme taking a targeted approach for young people. Review of term 1 will be undertaken in December.   
Page 16 of 100

Page 17

5
Challenges and Risks
COVID-19 
The Health and Social Care Partnership, its partners and the communities it serves continued to be impacted by the
COVID 19 pandemic. The Health and Social Care Partnership has maintained delivery of services and continues to
work with its partners to ensure resources are being managed and deployed to cover staff absences where needed
and continue to develop our remobilisation plans. We continue to work to ensure key staff receive both the Covid and
flu vaccine. 
A growing and ageing population 
Midlothian is the second smallest Local Authority in mainland Scotland but the fastest growing. This will continue to
pose challenges for health and social care services whilst also changing some local communities. As people live for
longer many more people will be living at home with frailty and/or dementia and/or multiple health conditions. An
increasing number of people live on their own, and for some this will bring a risk of isolation. 
Higher rates of long-term conditions 
Managing long-term conditions is one of the biggest challenges facing health care services worldwide, with 60% of all
deaths attributable to them. Older people are more susceptible to developing long-term conditions; most over 65s
have two or more conditions and most over 75s have three or more conditions. People living in areas of multiple
deprivation are at particular risk with, for example, a much greater likelihood of early death from heart failure. They
are also likely to develop 2 or more conditions 10-15 years earlier than people living in affluent areas. 
Higher rates of mental health needs 
Many mental health problems are preventable, and almost all are treatable, so people can either fully recover or
manage their conditions successfully and live fulfilling healthy lives as far as possible. The incidence of mental health
issues in Midlothian, while similar to the rest of Scotland, is a concern. Living in poverty increases the likelihood of
mental health problems but also mental health problems can lead to greater social exclusion and higher levels of
poverty. People who have life-long mental illness are likely to die 15-20 years prematurely because of physical ill-
health. 
Our services are under pressure 
People place a high value on being able to access effective health services when they need them. People expect to
receive high quality care services when these are needed whether as a result of age, disability, sex, gender or long
term health conditions. Yet there are a number of pressures on our services. 
Financial pressures
Financial pressures on public services are well documented. There is no doubt that we need to do things differently:
the traditional approach to delivering health and care services is no longer financially sustainable. 
We have particular pressures in our disability services with challenges to meet complex needs in the community
when in the past care settings may have been considered. 
Workforce pressures 
The Covid-19 pandemic has and will continue to influence the demand for, and deployment of, the health and care
workforce for the foreseeable future. 
There is reduced availability of staff with appropriate qualifications or skills, including General Practitioners, Social
Care Workers and Staff Nurses. This impacts on service delivery and development. 
Unpaid carers 
Unpaid carers fulfil significant, valuable and wide-ranging roles within Midlothian communities, helping to keep
people with care and support needs within our communities. During the pandemic many people became carers for
the first time, or saw changes to their caring role, resulting in them providing significantly more care for their elderly,
sick or disabled family, friends and neighbours. Through this period services supporting carers continued to offer a
range of support, including digitally, and by telephone, though services supporting the person they provide support to
may have been reduced, e.g. respite and day services, impacting on carers. Further work is required to reduce the
significant pressure and impact of caring that carers reported, by continuing to explore innovative options to enable
support to be given to both carers and the cared-for, and for there to be opportunities for breaks from caring. 
Acute hospitals Acute hospitals are under huge pressure due to unsustainable demand and financial restrictions.
Investing in community based services and work with carers is required to minimise avoidable and inappropriate
admissions and facilitate earlier discharge. By treating people closer to home, or in their own home the HSCP can
support admission avoidance and improve people’s outcomes.  
Page 17 of 100

Page 18

6  Page 18 of 100

Page 19

1
Progress in delivery of strategic outcomes
GIRFEC Service Priority: More children and young people are safe, healthy and resilient
Priority Action 1: Develop a Midlothian Whole Family Support Service
Progress and Achievement in Q2
• Funding is being concluded and this will inform final costings and structure. We have now recruited a
team leader (x1), social worker (x1) and the majority of children’s practitioners (x10).
Plans for improvement next Quarter and year ahead
• Develop and conclude the whole family support service strategy and plan with a view to going ‘live’
operationally in January 2023
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2
Funding and resources are
in place for 23/24 31/03/23 New
Measure 0 12 staff
recruited
Children's Services, Partnership and
Communities Performance Report Quarter Two
2022/23
Cabinet
Tuesday 29 November 2022
Item 5.3
Page 19 of 100

Page 20

2 
Priority Action 2: Increase the number of family who benefit from Family Systemic work 
Progress and Achievement in Q2
• 19 families referred in Q2 
Plans for improvement next Quarter and year ahead
• Second family systemic worker now in post.
• One worker has completed the NVR (Non Violent Resistance) foundation training and Hybrid
parenting group training to follow. The plan is to have both family systemic workers trained in this
approach and set up parenting groups that provide this form of coaching to parents and carers. 
• We will also be facilitating another set of awareness raising workshop which will be set up for the
beginning of 2023 to support other practitioners with the various methods and techniques used with
systemic approach 
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2
Number of families who
benefit from Family Systemic
Work
31/03/23 17 12  17 
Priority Action 3: Promote the use of Self-Directed Support (SDS) amongst families using services 
Progress and Achievement in Q2
• Q2 figure is 46 
Plans for improvement next Quarter and year ahead
• Guidance has recently been updated and refresher training across the service will follow. 
• Self Directed Suport practice Standards being developed 
• Transitions work has been re established
• Beginning to prepare for holiday provision next year and looking at opportunities to expand options
locally  
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2
Increase by 10% the number of
families who organise their own
support 
31/03/23 75 68  46 
Priority Action 4: Further develop the supports offered to Family Group Decision Making and Kinship
supports 
Progress and Achievement in Q2
• Three family group decision making workers now in post
• Lifelong links work underway
• Kinship worker has been seconded into team
• Kinship carer engagement event had been planned with a focus on trauma. Unfortunately this had to
be cancelled due to low numbers 
Plans for improvement next Quarter and year ahead
• Consolidate links both with whole family support and statutory service
• Consult with kinship group in order to strengthen relationship and in turn achieve improved attendance 
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2
Number of families who a
referred to Family Group
Decision Making
31/03/23
increase
21/22 figs by
15%
79  32
Page 20 of 100

Page 21

3 
Number of families who
participate in Family Group
Decision Making
31/03/23
Increase
21/22 figs by
10%
32  16
The number of assessments
by kinship worker  31/03/23
increase
21/22 fig by
15%
14  7
Percentage of kinship carers
who attend engagement
sessions   31/03/23
80% of
Kinship
carers one
event
New Measure  0
Reduce the number of CEYP
who enter homeless
accommodation vs other
suitable accommodation
31/03/23 2  
Data
available
March 2023
Number of CEYP living with
Foster Carers on After Care
arrangement post 21 years 
31/03/23 3 New Measure 
Data
available
March 2023 
Increase number of young
people in the National
Housing Project 
31/03/23 10-12 New Measure 
Data
available
March 2023
Average age of young people
in Continuing Care  31/03/23 Age 18  New  Measure   Data
available
March 2023 
Priority Action 5: Develop a pathway for children and families to navigate mental health services 
Progress and Achievement in Q2
• This is still to be developed 
Plans for improvement next Quarter and year ahead
• Single point of Access to be developed 
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2
1 x Single Point of Access in
place (SPOA)  31/03/23 New
Measure 0  N/A 
Priority Action 6: 6.0 
Progress and Achievement in Q2
• Referrals:                    10
• Cases progressing:     25
• Financial Gain for the quarter: £34, 908 
Plans for improvement next Quarter and year ahead
• CAB are still making attempts to recruit into the Early Intervention Income Maximisation post
• Once above worker is in post development sessions will be undertaken across the service to upskill
workers on income maximisation support 
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2
Number of  families offered
an income assessment 31/03/23 90 60  27 
Priority Action 7: Children, young people and their families experience high quality services 
Progress and Achievement in Q2
• No Inspections have been completed post COVID 
Page 21 of 100

Page 22

4 
Plans for improvement next Quarter and year ahead
• Improvement plans in place 
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2
Local Adoption Service will
provide high quality care and
support 31/03/23
Care
inspection
Grading of
GOOD
New Measure  Data available
March 2023
Local Fostering Service will
provide high quality care and
support 31/03/23
Care
inspection
Grading of
GOOD
New Measure  Data available
March 2023
Local Continuing Care/Adult
services will provide high
quality care and support 31/03/23
Care
inspection
Grading of
GOOD
New Measure  Data available
March 2023
Hawthorn Family Learning
Centre will provide high
quality care and support 31/03/22
Care
inspection
Grading of
GOOD
New Measure  Data available
March 2023
Young People’s Care
Homes will provide high
quality care and support 31/03/22
Care
inspection
Grading of
GOOD
New Measure  Data available
March 2023 
Priority Action 8: Children and young people are supported to develop a strong sense of their own
identity 
Progress and Achievement in Q2
• X3 workers have started the Diploma in Life Story Work qualification 
Plans for improvement next Quarter and year ahead
• Internal life story work training due to be delivered in October 2022 
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2
Staff are trained and
understand Life Story work  31/03/23 20 16  N/A at this time 
Priority Action 9: Children and young people are supported by staff who understand the importance of
trauma informed practice 
Progress and Achievement in Q2
• A trauma informed practice worker has very recently been recruited 
Plans for improvement next Quarter and year ahead
• Trauma Informed Practice worker will start in post and develop a work plan 
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2
staff are trained in using a 
trauma informed approach 31/03/23 20 15 N/A N/A at this
time 
Page 22 of 100

Page 23

5 
Challenges and Risks
National Care Service:  The ‘Bill’ which is currently in Stage 1 of the process is currently being considered with an
expectation that the lead committee will provide a report on the Bill at the start of 2023.  CELCIS have been
commissioned to undertake research around the inclusion of children’s services within the NCS.  This work should be
concluded by August 2023. 
Scottish Childhood Interview Model
Whilst the new model is beginning to evidence nationally improved outcomes for children and their families, the
continued challenge within Midlothian is that we are unable to offer more staff the opportunity to undertake this
training due to the lack of funding to replace those workers. As such we cannot future proof the delivery of the model
moving forward. 
Impact of Covid-19
We continue to prioritise resources to ensure there is adequate support in place to support our social work teams
who are already at capacity. In line with the foundations of the Promise we have aligned staff to other areas of the
service so that they ensure earlier support via Family Group Decision Making, Family Systemic Work and through the
development of the Whole Family Support Service.  
Children’s Services Referral’s 
There remains a significant increase in referrals into Children’s Services. A recent analysis continues to inform the
requirement for a different approach to supporting the many families who are experiencing financial hardship. Work
continues to be ongoing with partner agencies to consider how we address this from a holistic perspective. The
analysis highlighted that poverty is a growing area of concern and this has led to additional pressures on work load
capacity. 
Over quarter 2, referrals into Children’s Services have risen to 2212 in comparison to 1901 for the same period last
year.    
Workforce:
Midlothian is experiencing the same staffing issues encountered by other Councils. That there is a general lack of
experienced and skilled staff across the sector and we are having to increasingly rely on locum workers. 
Whilst not the only factor, the issue is exacerbated by our salaries not being as competitive as neighbouring local
authorities. Furthermore, there is a view that many workers are leaving the profession due to increasing demands
being placed on the social work role. We recognise that this is something that professional bodies are tackling
nationally 
Arrival of Ukrainian Families and Unaccompanied Asylum Seeking Children
We continue to welcome Ukrainian families into Midlothian adopting a holistic approach to the support on offer.  We
are confident that our steady and thorough approach to this work has ensured that we are robust in the work we are
undertaking. 
We also continue to ensure that we meet the agreed quota of unaccompanied children seeking asylum in Midlothian,
arriving from other parts of the world as well as planning and welcoming families fleeing from Afghanistan.    
Residential Care Homes/Complex Needs
Our care homes continue to ensure that children are placed within their local communities. 
We continue to work with partners to explore how best to meet the current demands and pressure whilst making sure
we future proof our services to deliver sustainable options locally for children and young people with ASN and
Complex and Enduring Needs 
Foster Care 
While Midlothian Council’s recruitment statistics remain encouraging, we continue to seek and explore other options
to expand our foster carer population recognising the need to future proof this area of service. We continue to
explore whether potential adopters would be interested in fostering.  
Kinship Care 
Our resources and kinship services are inextricably linked and rely on each other to rise to the pressure and
demands of keeping our children and young people in the local community. Whilst challenging this is entirely in
keeping with our local direction of travel and the Promise.  
Instrumental Music Service
Page 23 of 100

Page 24

6 
Providing free tuition to all pupils whilst having to meet a significant savings agreed within the Medium Term
Financial Strategy will be challenging. We are undertaking an option appraisal which shall consider how we best
deliver and design a service that is modern, implementing the learning during the pandemic, whilst also delivering a
service that is equitable and sustainable. 
Financial Pressures
- There is a financial challenge to deliver statutory services given the current budget gap.
- Due to the current financial climate there may be an impact on services as a result of the cost of living and increase
in poverty. 
Page 24 of 100

Page 25

7 
Page 25 of 100

Page 26

Page 26 of 100

Page 27

1
Corporate Solutions Performance Report
Quarter Two 2022/23
Quarter 2 (July – September 2022) was a challenging quarter for Corporate Solutions as it
continues to support post-pandemic recovery, present options to balance future years’
budgets and progress a range of transformation projects. The main challenges for this
quarter continue to be achieving and maintaining financial sustainability against increasing
external pressures. 
Challenges
Inflation as well as rising energy costs are affecting the construction industry in Scotland and
the UK is currently experiencing unprecedented adverse market conditions, leading to
significant rises in tender prices for a wide range of materials. There is evidence that
inflation of between 10% and 15% beyond BCIS predictions is affecting projects. Whilst
measures such as value engineering are partially mitigating cost increase there is a risk that
the capital budgets will need to be increased with a resultant impact on the funding
strategy. The situation continues to be monitored however it is necessary to revisit existing
capital plans and also review the 2022/23 service budgets and implement savings measures
in the year.
The current year’s budget, 2022/23, approved on 15 February 2022, was reliant on £12
million of one off funding measures. As reported at Council in October 2022, on the
assumption that funding flexibilities will offset any unfunded costs associated with current
pay offers and that there no further unfunded costs, the figure is now projected to be
£10.600 million. That is the extent to which the recurring expenditure in the current year’s
budget is financed by non-recurring funding sources. 
As a consequence of the inflationary increase in costs and the cash flat grant settlements,
the projected budget gap for 2023/24 now stands at £11.084 million rising to a projected
£23.154 million by 2027/28, albeit later years are based on the existing service
responsibilities with no adjustment for the consequences of the National Care Service
(Scotland) Bill. These budget gaps represent the extent to which recurring service
expenditure is projected to exceed recurring income for future years.
The Scottish Government’s Resource Spending Review (RSR), published on 31 May 2022,
presented very challenging financial planning parameters for Local Government. It indicated
cash flat grant settlements through to 2025/26 with a £100m increase for 2026/27.
Commentators on the RSR have recognised the impact on Local Government, with both
SPICe and the Fraser of Allander Institute stating that the proposals essentially represent a
7% real terms decrease in funding between 22/23 and 26/27. This is in contrast to the 4.7%
real terms increase that the Scottish Government will see overall (2% if social security
transfers are excluded), and the real terms increases that Health, Social Justice and Housing
services will see. The real term decrease planned for Local Government comes on top of
significant real term reductions since 2013/14, which has driven ongoing reform,
rationalisation, innovation and transformation work across Local Government. 
The Scottish Government’s National Care Services (Scotland) Bill, if enacted, would have
fundamental implications for the community and for Local Government itself.  The wide
Cabinet
Tuesday 29 November 2022
Item 5.4
Page 27 of 100

Page 28

2
reaching changes in the bill aim to deliver a National Care Service by the end of the
parliamentary term, which will impact on all aspects of the work of the Corporate Solutions
team, including financial implications, in both revenue and capital, our asset base, our
workforce, governance and legal arrangements and our digital infrastructure and platforms.
It will require an immediate focus for the foreseeable future and this will inevitably have
implications for other priority work at a time of continued resource constraint. 
Corporate Solutions will “deliver forward looking services fit for a modern
21st Century organisation and put the citizen at the centre of Service
Redesign”.
Corporate Solutions has shifted to a structure with six service areas of Finance, Human
Resources, Digital, Customer Services, Legal & Governance and Corporate Resources. 
Building on our nine drivers for change, Corporate Solutions has a particular focus on the
key elements of the route map that encompass the delivery and acceleration of the Capital
Programme, delivering digital first and remote working. The redesign of services and the
changes to build back better are predicated on the overarching principle that in delivering
services, whether commissioned internally or externally, we will keep our communities, our
employees and our environment safe, at the same time as meeting our commitment to
being carbon neutral by 2030. 
As a strategic partner, NESTA, the UK's innovation agency for social good are, through their
people powered results team, supporting us to pioneer new approaches to achieving
change and innovation. These approaches are smarter, faster, more collaborative and more
inclusive of citizens and people working at the front line. This work recognises that people
who are closest to services are the experts in both their own experience and the community
they live in, but often don’t have enough influence over transformation efforts. 
The key activity which underpins this work and which the service is focused on includes: 
a) Securing continued financial sustainability and maintaining strong financial
management across the Council through the delivery of the Council's Medium
Term Financial Strategy (MTFS) incorporating Capital Strategy and Capital
Investment plans, Reserves Strategy and Treasury Management Strategy;
b) Nurturing a highly motivated and effective workforce through the delivery of
the Workforce Strategy and the development of Service Workforce Plans;
c) Digital first and embracing data insight and analytics by developing and
implementing a refreshed Digital Strategy and Digital Learning Strategy;
d) A refresh of the Customer Services Strategy and implementation of the online
payments and services (CSP) platform;
e) A refreshed Procurement Strategy and Contract Delivery Plan. 
Medium Term Financial Strategy (MTFS)
The core objective of the MTFS is to secure the Council’s financial sustainability during an
ongoing period of financial constraint coupled with acute service demand pressures and
increasing customer expectations. 
The MTFS is not only about balancing the budgets, it provides a means to ensure as far
as possible that the limited resources available to the Council are targeted on delivery
of improved outcomes, particularly against the key priorities of:
Page 28 of 100

Page 29

3 
• Reducing the gap in learning outcomes
• Reducing the gap in health outcomes
• Reducing the gap in economic circumstances
•   Reducing Midlothian carbon emission to net zero by 2030 
Achievements 
• Completion of the audited 2021/22 Financial Statements in advance of the revised
statutory deadline with an unqualified audit opinion. 
• Presentation to Council in August of a full suite of financial monitoring reports for
quarter 1 of 2022/23 to promote sound financial governance. 
• The finance team continue to provide in-depth financial input to key revenue and
capital projects embedded in the Medium Term Financial Strategy
• Resources continue to be prioritised to process Scottish Welfare Fund and Self
Isolation Grants as soon as these are received. This has meant that processing times
for change in circumstances for benefit applications etc. are currently experiencing
some delay as noted later in the report. 
• In this quarter £215,051 was awarded from the Scottish Welfare Fund. 1,873
applications were received for crisis grants of which 988 met the criteria and
resulted in payments of £109,583. 
• Community Care Grant applications totalled circa 316 of which 103 payments were
made totalling £105,468. 
• In addition there were 105 applications for Self Isolation Support grants of which 39
qualified with payments totalling £8,775.
Workforce Strategy
The purpose of the Workforce Strategy is to ensure that the Council continues to have a
workforce that is able to deliver positive outcomes for the people of Midlothian. It sets out
an approach to supporting, developing and reshaping the workforce now and in the future
in response to changes as a consequence of national and/or local issues. It is underpinned
by the Council’s values and vision. 
The Workforce Strategy is an important tool to outline the organisation’s approach to
articulating how workforce issues will be managed and ensures the Council has the people
and skills to manage change and deliver services effectively and efficiently.
Achievements
• Trade Union negotiations have taken place in relation to a revised Whistleblowing
Policy and an Overpayments Policy. It is anticipated these will be made available
soon once final agreement is reached. 
• Continuation of a rolling programme of Wellness@Midlothian initiatives to ensure
we continue to support the wellbeing of our staff including a recent employee
engagement event at Stobhill.  
• Revised industrial relations guidance was created and utilised for the strikes which
took place in waste services. 
• The Council agreed to 10 days of miscarriage leave to be incorporated into our suite
of family leave policies and we signed up to the Miscarriage Association’s pledge. In
addition, IVF treatment leave has also been added to our suite of family leave
offerings.
Page 29 of 100

Page 30

4
• We continue to track our gender pay gaps and employee turnover rates. Turnover
varies through the year. Consideration of the levels of turnover across services,
locations and particular groups of employees helps to inform workforce planning and
resourcing. Aside from 2020/21 where staff turnover was 5.9%, the turnover rate
has been consistent the last 3 years between 9-10.5%. Turnover rate over the last
few quarters has been static between 2.3 and 2.4%. Rate for Q2 3.6%. 
Digital Strategy and Digital Learning Strategy
Supported by the appointment of SOCITIM Advisory (Society for innovation, technology and
modernisation) as a strategic partner and led by the Digital First Board, work progressed to
deliver an ambitious new digital strategy, Digital Midlothian 2021-2023, “Empowering
People, Enabling Growth”. Aimed at improving the way services are delivered to Midlothian
citizens, the strategy sets out how local outcomes will be improved by delivering digital
services to digitally connected communities. 
Among the aims set out in the new strategy are plans to:
• Refresh the council’s approach to customer service, focussing on ‘digital first’, while
making sure alternatives remain in place for those who need them 
• Have a council website that meets customer needs , enabling customers to request
and pay for services online and to log in to see their interactions 
• Implement an update service, so that customers contacting the council online can
receive follow up text messages or emails 
• Look at opportunities to automate and better integrate processes so that staff can
focus on the things that matter most to customers 
• Enable people to stay independent and healthy for longer by using data and
technology 
• Introduce bookable online and face-to-face appointments so that customers don’t
have to waste time queuing or travelling and to help the council reduce costs 
• Review and improve online engagement with customers, including online
consultations, communications and social media 
• Promote Midlothian as a digital destination, creating an environment that attracts
leading digital businesses to the area and supporting the innovation of start-ups 
• Cultivate digital skills in our communities, ensuring that young people have access to
the technology and support that they need to improve educational outcomes and to
prepare them with the skills they need for the future 
• Reduce digital exclusion and empower learners of all ages, enabling online access
and supporting them to develop digital skills 
• Support Midlothian to achieve high speed connectivity, smart infrastructure and
resilient cyber defences 
Funding was secured in the 20/21 budget to deliver the Equipped for Learning project,
providing every school age pupil in the county with a learning device such as an iPad or
Google Chromebook as part of Midlothian Council’s £10.5 million investment in digital
learning. Midlothian is the first local authority in Scotland to launch a digital learning project
on this scale. The ambitious plan recognises the importance of digital tools to support
learning. This investment will ensure Midlothian’s young people have the digital skills they
need to secure a positive destination such as a job or a Further or Higher Education place,
which in turn will help support the local economy. Making sure all pupils have a device will
also help young people with additional support needs by giving them access to technology
Page 30 of 100

Page 31

5
that can help with their different learning needs. Primary schools will have the flexibility to
select the right device to support their school community until Primary 7 where all pupils
from P7 upward will receive a Google Chromebook. Early years settings will also benefit
from the digital strategy as they will have access to shared iPad devices. 
Achievements 
• Continued progression of the new Digital Services Strategy ensuring the Council has
the capacity and skills to take forward the associated investment and delivery of
plans. 
• Hybrid Working/Office refresh: Workspaces in Midlothian and Fairfield House have
been upgraded with new monitors and docking stations to support hybrid working.
Over 1000 corporate laptops have been migrated to Global Protect and over 500
mobile phones have been migrated to new platforms to allow better integration
with O365 plans. Over 400 legacy desktops have been upgraded and this work
continues.  
• Target Operating Model: A new structure was agreed to strengthen the core staffing
of Digital Services by Council and CMT. A service review has commenced to
implement the new staffing structure.  Chief Digital Officer has been appointed to
start in Q3 2022/23.
• Education strategy: New Web Filtering software has been successfully piloted in
schools. A new Wi-Fi network for Chromebooks and iPads has been introduced. A 3rd
party Wi-Fi audit for schools has taken place and the actions are being implemented
to improve coverage and capacity. 
• Digital enabled projects: a number of business applications have been upgraded and
these continue to improve customer and staff experience, including SQL migrations
and SSRS implementation and a major upgrade of the virtualised and storage server
environment.  
• Cyber Security resilience: The cyber risk is high. A new Cyber Analyst joined the
Council in July. The Corporate Management team were provided with a cyber report
to setting out actions to strengthen core digital services team and purchase of
additional cyber mitigation tools. New software has been deployed to alert staff
responding to phishing emails. New vulnerability scanning software has also been
deployed.
• Cyber Security Compliance: PSN penetration testing was conducted in April and
following mitigation a report was sent to the Cabinet Office for independent review.
The Council achieved PSN certification this quarter. 
Customer Service Strategy
The Customer Service Strategy defines the key drivers that will enable Midlothian Council to
deliver ‘customer service excellence’ to our communities. It outlines the commitment to
provide choice to the customer in the way services are accessed and provided. This includes
innovation, partnership working and optimising the use of technology within resource
constraints. The strategy will help us to change the way we deliver services utilising the
latest technologies and linking to national frameworks. 
As one of the fastest growing areas in Scotland, the Council cannot support more customers
using the current resources, systems and processes. This means that the adoption of digital
Page 31 of 100

Page 32

6
and automated processes will be key to continuing to provide a seamless customer journey,
satisfying enquiries at the first point of contact and meeting increased demand. 
Customer self-service and new automated processes can help deliver some key services
without customers dealing directly with a member of staff and could truly transform the
way the Council deliver services. Increasing the pace of digital transformation, particularly in
front-facing customer services, will be a service and corporate priority, for Midlothian
Council – one that can deliver the required efficiencies without negatively affecting
customer experience.
Achievements 
• Work continues on implementing the Customer Services Platform (CSP) for
Midlothian Council and redesigning key services that will improve the end to end
customer journey. The modules in progress (missed bins, assisted collections,
additional recycling containers, bulky uplifts, registrar’s certificates, customer
feedback and Subject Access Requests) are being designed, configured, built and
tested with services. The Registrars module is in the final testing stages with recent
delays due to external supplier live payment issues. The core build for the customer
feedback module is complete with final build refinements planned during Q3.
Engagement continues with service areas and a number of modules are anticipated
to launch in the coming months.
• Registrars have remained steady with the rush of catch-up weddings settling. There
have been changes to the remote registration process which is now allowing births
to be registered remotely.
• Library Services remain busy with the majority of activities and events which had
been suspended due to COVID having resumed. We had a very successful and busy
Summer Reading Challenge with our starting and completing numbers reaching pre-
COVID figures. We also had a wide range of events making up our summer
programme. We worked in partnership with the University of Edinburgh’s
Engineering Department which tied in perfectly with the ‘Gadgeteers’ theme and
there was much fun had at rocket launches, bridge building and pop-up engineering
sessions all across the county. 
• August saw the launch of the NHS ‘Near Me’ video appointment service in
Gorebridge Library. This pilot project provides a safe, secure private space for
appointments and supplies the technology and support for people to access them.
Midlothian is one of 10 library services across the country providing this service. 
Procurement Strategy 
The procurement function has a central role in supporting the Council to achieve its
strategic priorities within a constrained financial envelope. Procurement allows the Council
to repurpose its spending power to drive our key strategic priorities and to secure the best
possible value and outcomes for Midlothian. Effective procurement can maximise the value
of every pound spent in terms of jobs, skills and supply chain opportunities in the local
community. We will aim to address economic, social and environmental considerations at all
stages of the procurement cycle within the rules of open, fair and transparent competition. 
The Procurement team, in conjunction with Economic Development, have developed a
Small and Medium Enterprise (SME) Strategy to support and assist local businesses to win
contracts fairly and transparently in a competitive market. We will further develop our
Page 32 of 100

Page 33

7
collaborative and commercial relationships with key partners as part of our strategic
category management approach, to deliver the best possible outcomes for the citizens of
Midlothian. 
The team continues to utilise framework agreements with Scotland Excel and Procurement
for Housing (amongst others) which not only provides an easier route to market but also
delivers value for money. The Procurement team is currently working with Scotland Excel to
review the service to ensure it remains fit for purpose. We have also explored with
neighbouring Councils albeit with limited success opportunities to collaborate on the joint
delivery of procurement services and so will continue to engage with Scotland Excel to
support service development. 
Achievements 
• Work continues on the development of the SME/Procurement strategy. The team
have reviewed and streamlined the non-competitive action process, the request for
procurement and developed a non-regulated procurement process and new contract
database. The team are working to implement a review of the procurement
arrangement across the Council including continuing to explore options for joint
working with neighbouring councils, populating and maintenance of the new
contract database. 
• The team continues to utilise framework agreements with Scotland Excel and
Procurement for Housing (amongst others) which not only provides an easier route
to market but also delivers value for money. 
• A range of high value/complex contracts continue to be awarded and key activities
include overhaul of Contract Database and City Deal participation. A follow up
review of upcoming expiring contracts within Health and Social Care began in Q2 and
is in early stages. The review will look for opportunities to extend services, and
consolidate opportunities for efficiency.  
• Progress being made for consultation on a new procurement structure, designed to
increase the capacity and capability in this area. 
Growing Council
In addition to the financial sustainability challenge referenced earlier, other challenges for
Midlothian continue with our recovery out of the pandemic, the cost of living crisis, the
growing and ageing population and the increasing demand for services that this brings. 
Midlothian is projected to have the highest percentage change in population size of all
mainland council areas in Scotland. From 2018 to 2028, the population of Midlothian is
projected to increase from 91,340 to 103,945. This is an increase of 13.8%, which is in
contrast to a projected increase of 1.8% for Scotland as a whole, with a 40.9% increase in
older people over 75. In addition, Midlothian has 10 zones which falls into the most
deprived areas giving a local share of 8.7% living in the most deprived areas in Scotland. 
This growth creates the opportunity to meet the housing need with 25% of new homes
being built in the affordable housing bracket, in addition to the expansion in Council house
building. This construction will directly support employment and will see a steady increase
in the value of Council Tax income received over time. 
Page 33 of 100

Page 34

8
The approved Capital Strategy sets out the infrastructure required to meet those
demographic pressures and includes the financial contributions Midlothian will make to the
Edinburgh and South East Scotland City Region Deal. Encompassing five main themes the
City Region Deal will bring significant investment across the regions with total investment of
circa £1.3 billion across: 
• Research, Development and Innovation: £751 million 
• Integrated Regional Employability and Skills: £25 million 
• Transport: £156 million 
• Culture: £45 million 
• Housing: £313 million 
Through the Data Driven Innovation strand the Deal will leverage existing world-class
research institutes and commercialisation facilities in order that Easter Bush becomes a
global location of Agritech excellence. The Easter Bush project includes significant
investment in transport infrastructure along the A701/2 transport corridor. In addition, by
improving on-site infrastructure at Easter Bush and transport infrastructure, The University
of Edinburgh expects commercial partners will be able to co-locate at scale to commercialise
Agritech breakthroughs. 
The Capital Investment Strategy sits centrally within the Council’s future planning activities
and in doing so has to reflect the demands of Council services to ensure positive outcomes
are achieved in the right place, at the right time for the maximum benefit to
Midlothian.  The extensive capital programme, totalling £0.8bn, delivers new schools, a
record investment in council housing, improved community infrastructure, investment in
the local transport network and in innovative developments such as the new low carbon
heat network in Shawfair. 
To ensure Midlothian is ‘building back better’, this investment is also creating new jobs,
apprenticeship opportunities, opportunities for businesses and communities and families
hard-hit by the impact of COVID-19. These new opportunities help lead the way out of the
pandemic and towards a better future for Midlothian. 
Page 34 of 100

Page 35

9  Page 35 of 100

Page 36

Page 36 of 100

Page 37

Totall popul,atio
1
1n 93,200 Mal,es44,800andlfemall,es4S,400
Be11i:ween 2018 and .2:028, the population of IM'idlothia 11 is projected] to
i111crease by 13. 8% to 10.3,9145 compared to 1.8%, for Scotland as a
I: mp I oyme nt levels are above
Scot
t
ish ave rage with
48,000 people in
employment (2021J
Mlidll!otih · a n's u nem ploym ent
rate (model bas,ed) betw,een
Oct 20 to Sep 21 stands. at
3.4% and is below the
Scot
t
ish ( 4.2%)
Mid lot h ia n has 2_. 7 20
b11.11sinesses. 89.,9% small
employers, 3. 7% med i m and
16.4% larg,e. (20.20)
Job d,en:siity is 0.59 (this means
that �here ar-e 59 ·□tis. fc.r e.,.ery 100
IPeaple aged 16-54) {2020}
Fu II ti me average gross
wee,kly pay is £59 . of
peopl,e living in Midloth·an
(202.1}
There are 095 people
claiming out of work
benefiits, the highest le,vel of
claimants since the 1990's.
In November 2020, a total of
7,155 households in
Midlothian were on
Universal Credit.
24.2% of adults lhad a
lirniiti111g lon,g term
oondifo11111 in M�dlothian
{2019}
In 2020 the lead'"ng cause
of death for male·s was
ischemic heart diseases
(14.5%)
The I ea ding cause of
death for females was
dementia and Alzheimer's
(12.9%)
Cost of living - UK
Energy oosts increased by 4% in April 202.2.
Petrol p,rices 'incr,eased by 29.73% and o·esel
prices i nueased by from May 21 to May 22.
lnllafon- "Jhe Consumer Priices Index (OPI) rose by
9% in the 12 months to April 22, up from 7% in
40,137 households
in Midlothian {2020}
By 202.8, Midlothian is
projected to have the
highest percentage
change in household
numbers out of all .32
council areas, am
increase of 16%
compared to 4.9% for
Scotland as a whole. (202D}
24% of ch'ildrem weIre
liv"ng· in pm,·e rty in
Mlidll!oth".rn
Midlothian has lower than
Scottish average levells of
social exclu.s"iion. However,
geographic pockets of
mulitiple deprivation remain,
particularly within the
Cellltral Dalkeith/
Woodham, Mayfield &
Easthouses, and
1
Gorebridge
areas. Two areas within
Bonn,rigg and L:oanlrl,ead
also now emerging as areas
of concern.
Appendix 1
Page 37 of 100

Page 38

2,291 1,844
3,893
3,345
2,710
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of webforms
recieved via Contact Centre
58,316
42,825 45,903 44,243 46,715
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of virtual library
visits
3.20%
2.30% 2.40% 2.40%
3.60%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Percentage of staff turnover
(including teachers)
396,832
581,677
808,000
208,730
423,781
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Total amount granted from
Scottish Welfare Fund for crisis
grants and community care
grants (£)
268 247 253
364
257
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of Freedom of
Information requests received
(Council wide) 
472
362 354 331 338
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of social media
contacts via Contact Centre
108
44 54 59
37
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of complaints
recieved (Corporate
Solutions)
101
109
115
109 109
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Total number of female
employees in top 5%
6453 6776
4933
8343 8892
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of Council Tax
transactions recieved online
2.58
1.72
Q1 22/23 Q2 22/23
Corporate Solutions - Average
number of working days lost
due to sickness absence
(quartely)
2,173
2,189
Q1 22/23 Q2 22/23
Number of Scottish Welfare
Fund applications received
609
105
Q1 22/23 Q2 22/23
Number of Self isolation
support grant applications
received
A full review of quarterly performance data is available via Pentana (Browser login link - https://midlothian.pentanarpm.uk/login)
Corporate Solutions Q2 22/23 performance report                                       Trend Data
Page 38 of 100

Page 39

42,317
37,579
44,769
40,575
38,943
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of Contact Centre
Calls
14 16
11 10
17
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Average processing time for
change of circumstances
(Days)
Target (8 days)
38 43
57
69
45
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Average processing time for
new benefit claims (Days)
Target (25 days)
4
2.3 2.7 3.5 2.5
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Average time in working days
to respond to complaints at
stage 1
Target (5 days)
Our customers have choice in the way Council services are accessed and provided
Channel-shift has increased by the adoption of new digital tools and automated practices
Delivery of customer service excellence to our communities
Our Customers
Holistic
Modern
Hub and Spoke
One size fits one
Key highlights
Work continues on implementing the Customer Services Platform (CSP) for Midlothian Council and redesigning key services that will improve the end to end customer
journey. The modules in progress (missed bins, assisted collections, additional recycling containers, bulky uplifts, registrar’s certificates, customer feedback and Subject
Access Requests) are being designed, configured, built and tested with services. The Registrars module is in the final testing stages with recent delays due to external
supplier live payment issues. The core build for the customer feedback module is complete with final build refinements planned during Q3. Engagement continues with
service areas and a number of modules are anticipated to launch in the coming months.
Registrars have remained steady with the rush of catch-up weddings settling. There have been changes to the remote registration process which is now allowing births to
be registered remotely.
Library Services remain busy with the majority of activities and events which had been suspended due to COVID having resumed. We had a very successful and busy
Summer Reading Challenge with our starting and completing numbers reaching pre-COVID figures. We also had a wide range of events making up our summer
programme. We worked in partnership with the University of Edinburgh’s Engineering Department which tied in perfectly with the ‘Gadgeteers’ theme and there was
much fun had at rocket launches, bridge building and pop-up engineering sessions all across the county.
August saw the launch of the NHS ‘Near Me’ video appointment service in Gorebridge Library. This pilot project provides a safe, secure private space for appointments
and supplies the technology and support for people to access them. Midlothian is one of 10 library services across the country providing this service.
Areas of improvement
There continues to be a steady volumes of calls via our Contact Centre, although calls have reduced compared to this time last year.  There remains a significant number
of applications for Scottish Welfare Fund. Resources continue to be prioritised to processing Scottish Welfare Fund as soon as these are received. Inevitably this has
meant that processing times for change in circumstances for benefit applications etc are currently experiencing some delay as set out in the data below. In the quarter
£215,051 was awarded from the Scottish Welfare Fund. 1,873 applications were received for Crisis grants of which 988 met the criteria and resulted in payments of
£109,583. Community Care grant applications totalled circa 316 of which 103 payments were made totalling £105,468. In addition there were 105 applications for Self
Isolation Support grants of which 39 qualified with payments totalling £8,775.
Page 39 of 100

Page 40

3,787 3,478 3,538 3,141 3,3113,368 3,280 3,325
2,982 2,975
Q2 21/22 Q3 21/22 Q4 21/22 Q1 22/23 Q2 22/23
Number of service incidents
Received Resolved
2,040 1,983 2,115 1,969
2,298
1,672 1,757 1,917 1,719
2,038
Q2 21/22 Q3 21/22 Q4 21/22 Q1 22/23 Q2 22/23
Number of service requests
Received Resolved
We pledge to optimise the ways in which the Council does digital, data and technology to work effectively, collaborate, make decisions, adapt and
innovate
We pledge to create better relationships between the Council and its communities by providing modern digital services that communities wants
to use
We pledge to maximize opportunities for digital, data and technology to enhance quality of life, the economy, sustainability and individual
opportunity in Midlothian
Digital by default
Key highlights
 Continued progression of the new Digital Services Strategy ensuring the Council has the capacity and skills to take forward the associated investment and
delivery of plans.
 Hybrid Working/Office refresh: Workspaces in Midlothian and Fairfield House have been upgraded with new monitors and docking stations to support hybrid
working. Over 1000 corporate laptops have been migrated to Global Protect and over 500 mobile phones have been migrated to new platforms to allow better
integration with O365 plans. Over 400 legacy desktops have been upgraded and this work continues. 
 Target Operating Model: A new structure was agreed to strengthen the core staffing of Digital Services by Council and CMT. A service review has commenced
to implement the new staffing structure.  Chief Digital Officer has been appointed to start in Q3 2022/23.
 Education strategy: New Web Filtering software has been successfully piloted in schools. A new Wi-Fi network for Chromebooks and iPads has been
introduced. A 3rd party Wi-Fi audit for schools has taken place and the actions are being implemented to improve coverage and capacity.
 Digital enabled projects: a number of business applications have been upgraded and these continue to improve customer and staff experience, including SQL
migrations and SSRS implementation and a major upgrade of the virtualised and storage server environment. 
 Cyber Security resilience: The cyber risk is high. A new Cyber Analyst joined the Council in July. The Corporate Management team were provided with a cyber
report to setting out actions to strengthen core digital services team and purchase of additional cyber mitigation tools. New software has been deployed to
alert staff responding to phishing emails. New vulnerability scanning software has also been deployed.
 Cyber Security Compliance: PSN penetration testing was conducted in April and following mitigation a report was sent to the Cabinet Office for independent
review. The Council achieved PSN certification this quarter.
Areas of Improvement
The gap between requests received and resolved in the graphs below is principally as a consequence of the lead time for new devices, reflecting global demand and the
supply chain. Where necessary interim solutions are provided and the requests closed when a permanent resolution is secured.
Work will progress on the Digital Services priorities to continue to drive the Council’s vision to improve outcomes using digital and data through the Digital First board,
ensure the Council is well positioned to take advantage of emerging national initiatives and exploit technology in order to reduce costs and improve services.
Modern
Holistic
Hub and Spoke
One size fits one
Page 40 of 100

Page 41

4.81
7.26
9.33
2.71
4.81
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Sickness Absence Days per
Employee - cumluative (All
employees)
2.64% 2.37% 2.52% 2.57% 2.84%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Gender pay gap between
average hourly rate of pay for
male and female (all employees)
Scottish average 20/21 (3.66%)
1.86
3.42
4.61
1.35
2.1
Q2
21/22
Q3
21/22
Q4
22/23
Q1
22/23
Q2
22/23
Teacher Sickness absense
days
5.99
8.8
11.22
3.25
5.92
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Local Government employees
Sickness absence days
Our Workforce
Key highlights
 Trade Union negotiations have taken place in relation to a revised Whistleblowing Policy and an Overpayments Policy. It is anticipated these
will be made available soon once final agreement is reached.
 Continuation of a rolling programme of Wellness@Midlothian initiatives to ensure we continue to support the wellbeing of our staff including
a recent event at Stobhill. 
 Revised industrial relations guidance was created and utilised for the strikes which took place in waste services. As any negotiations have now
concluded at national level, Employment and Reward colleagues will now progress to implementing the agreement.
 The Council agreed to 10 days of miscarriage leave to be incorporated into our suite of family leave policies and as an organisation we have
we signed up to the Miscarriage Association’s pledge. In addition, IVF treatment leave has also been added to our suite of family leave
offerings.
 We will continue to track our gender pay gaps and employee turnover rates. Turnover varies through the year .Consideration of the levels of
turnover across services, locations and particular groups of employees helps to inform workforce planning and resourcing. Aside from
2020/21 where staff turnover was 5.9% the turnover rate has been consistent the last 3 years between 9-10.5%. Turnover rate over the last
few quarters has been static between 2.3 and 2.4%. Rate for Q2 3.6%.
Areas of improvement
Sickness absence days remain similar to that of last year council wide with no significant improvements.   For Corporate Solutions, of the FTE days lost
due to sickness, 67% was due to long term sickness, 13% self-certified, 20% short term absence. While there is no identifiable trend either in short
term or long term absences work continues with each service area to review attendance levels and support those staff who are absent to be able to
return to work.
Our people deliver high performing services
We build an entrepreneurial council for future
We demonstrate strong and consistent leadership
We Promote Equality, diversity and fairness
Holistic
Sustainable
Hub and Spoke
Preventative
Page 41 of 100

Page 42

95% 95% 95%
94.3%
94.9%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
% of invoices sampled and
paid within 30 days -
Corporate Solutions
Target (95%)
7%
11% 14%
5%
9%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
All recovery overpayments -
as a % of all HB overpayment
debt
Target (20%)
131% 110% 108% 146% 127%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
In year recovery of
overpayments - % of all
Housing benefit
overpayments indentified
Target (80%)
Finance
Key highlights
 Completion of the audited 2021/22 Financial Statements well in advance of the revised statutory deadline with an unqualified audit opinion.
 Presentation to Council in August of a full suite of financial monitoring reports for quarter 1 of 2022/23 to promote sound financial governance.
 The finance team continue to provide in-depth financial input to key revenue and capital projects embedded in the Medium Term Financial Strategy
Areas for improvement:
The current year’s budget, 2022/23, approved on 15 February 2022, was reliant on £12 million of one off funding measures. As reported at Council in October 2022, on
the assumption that funding flexibilities will offset any unfunded costs associated with current pay offers and that there no further unfunded costs, the figure is now
projected to be £10.600 million. That is the extent to which the recurring expenditure in the current year’s budget is financed by non-recurring funding sources.
As a consequence of the inflationary increase in costs and the cash flat grant settlements, the projected budget gap for 2023/24 now stands at £11.084 million rising to a
projected £23.154 million by 2027/28, albeit later years are based on the existing service responsibilities with no adjustment for the consequences of the National Care
Service (Scotland) Bill. These budget gaps represent the extent to which recurring service expenditure is projected to exceed recurring income for future years.
The Scottish Government’s Resource Spending Review (RSR), published on 31 May 2022, presented very challenging financial planning parameters for Local Government.
It indicated cash flat grant settlements through to 2025/26 with a £100m increase for 2026/27. Commentators on the RSR have recognised the impact on Local
Government, with both SPICe and the Fraser of Allander Institute stating that the proposals essentially represent a 7% real terms decrease in funding between 22/23 and
26/27. This is in contrast to the 4.7% real terms increase that the Scottish Government will see overall (2% if social security transfers are excluded), and the real terms
increases that Health, Social Justice and Housing services will see. The real term decrease planned for Local Government comes on top of significant real term reductions
since 2013/14, which has driven ongoing reform, rationalisation, innovation and transformation work across Local Government.
Sustainable
Holistic
Modern
The revised grant settlement for 2022/23 means a further real terms reduction in core funding. The reliance on one off funding sources to
balance the 2022/23 budget combined with the challenging outlook for local government funding adversely impacts on the Council ‘s
financial sustainability and will result in the need to cut services in 2023/24 and beyond.
The Council has robust and effective financial management arrangements
Preventative
Page 42 of 100

Page 43

18.07% 15.44% 14.68% 16.81%
17/18 18/19 19/20 20/21
% of procurement spent on
local enterprises (LGBF)
Sccotish average 20/21 (29.11%)
Procurement
Key highlights
 Work continues on the development of the SME/Procurement strategy. The team have reviewed and streamlined the non-competitive action
process, the request for procurement and developed a non-regulated procurement process and new contract database. The team are working to
implement a review of the procurement arrangement across the Council including continuing to explore options for joint working with
neighbouring councils, populating and maintenance of the new contract database.
 The team continues to utilise framework agreements with Scotland Excel and Procurement for Housing (amongst others) which not only provides
an easier route to market but also delivers value for money.
 A range of high value/complex contracts continue to be awarded and key activities include overhaul of Contract Database and City Deal
participation. A follow up review of upcoming expiring contracts within Health and Social Care began in Q2 and is in early stages. The review will
look for opportunities to extend services, and consolidate opportunities for efficiency. 
 Progress being made for consultation on a new procurement structure, designed to increase the capacity and capability in this area.
Areas of improvement
Work will continue to progress on the Procurement priorities: Review and reshape the procurement service, implement learning from the Scotland excel
review and in partnership with Economic Development and stakeholders continue to ensure business community benefits in the supply chain to maximise
opportunities for local people.
Holistic
Sustainable
Hub and Spoke
Best Value is evidenced Council Wide in the procurement of goods and services
Effective contract and supplier management across the whole of the procurement journey 
One size fits one
Page 43 of 100

Page 44

Page 44 of 100

Page 45

1
Education Performance Report Quarter Two 2022/23
01. Progress in delivery of strategic outcomes
Cabinet
Tuesday 29 November 2022
Item 5.5
Page 45 of 100

Page 46

2
01. Progress in delivery of strategic outcomes
22/23: Midlothian Single Plan Priority Reducing the gap in learning outcomes  
Priority 1: Attainment and Achievement  
1.1 Improve attainment within the Broad General Education (BGE) stages: 
Trend Data & Target 
2017 2018 2019 2021 Ave. Target
Pr Literacy  62.25% 74.68% 72.76% 65.75% 68.86% 71.5%
Pr Numeracy 71.14% 79.63% 77.77% 72.80% 75.34% 72.0%
S3 Literacy 62.25% 74.68% 72.76%  69.90% 88.0%
S3 Numeracy 88.81% 87.68% 89.56%  88.68% 90.5% 
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
1.1.1 Develop and
implement a raising
attainment strategy 
- Consulted with school leaders on
strategy development. 
- Key messages informed by data
analysis. 
- QA Visit 1 started and will continue in
next quarter to reinforce stretch aims and
processes to monitor and track. 
- Recovery team working in 4 targeted
schools
- Draft strategy developed and shared with
school leaders and key networks.
- Literacy and Numeracy guidance in place
reflecting key pedagogical approaches
outlined in Draft Raising Attainment
Strategy.
- Literacy, Numeracy and QAMSO Networks
involved in supporting school/ASG
moderation.
- Further training and support for QAMSO
Network will develop their expertise in
assessment and moderation, enabling
them to lead staff training within their own
schools/ASG.
- Attainment Visits support school engagement with
strategy.
- Data uplift reveals a positive shift in attainment
predictions and progress towards stretch aims.
- Final Strategy agreed and in place. 
- QA discussions and visit 3 activity supports
engagement with strategy and future school
improvement priority planning. 
- Themes from Visit 2 (Focus 2.3) reflect range of
effective pedagogical approaches.
- Schools and ASGs planning for Moderation activity
within BGE (literacy/numeracy focus determined by
local data and utilising Midlothian Curricular
Frameworks)
- School SIRs include evidence of
approaches taken and progress made
towards stretch aims.
- School SIPs and PEF plans for 2023-24
reflect strategy.
- Plan for professional learning established
in consultation with schools and networks
and informed by analysis of SQR,
attainment data and PEF reporting.
- Analysis of SQR reveals effective
moderation taking place in all
schools/ASGs and plans in place to
continue to build capacity and activity in
session 2022/23.
1.1.2 Develop a full
range of curriculum
frameworks. 
- Identified and shared examples of
coherent curriculum pathways 3-18, for
example, in STEM or the world of work.
E.g. East Ayrshire flexible skills pathway 
- Numeracy Framework shared with all
schools. The Education Executive Group
(EEG) has agreed a set of primary
curriculum frameworks to pilot 2022-23.
- Use these frameworks to check there are
coherent 3-18+ pathways in each ASG.
E.g. pathways into high-income STEM
careers, pathways into creative/cultural
careers. Engage our regional FHE partners
in strengthening pathways.
- Literacy Framework shared with all
schools.
- Agreed draft Curricular Frameworks (with
exception of Literacy and Numeracy) in use
in identified schools/ASGs for pilot and
evaluation.
- Deliver Leadership of Curriculum Design training.
Engage partners eg Education Scotland Curriculum
Innovation Team to support action research in
Curriculum Design. E.g. West Partnership curriculum
redesign project
- Professional Learning Offer in place to support
engagement with literacy and numeracy frameworks
- Updated draft frameworks shared with EEG
- Literacy, Numeracy and QAMSO Networks involved
in supporting school/ASG moderation.
- Develop and introduce curriculum guidance for
schools
- All schools using Literacy and Numeracy
Frameworks to support planning,
teaching and assessment.
- Finalised suite of wider curricular
frameworks launched with all schools and
settings for use from 2023/24.
- Moderation activity planned for session
2023/24 utilising Literacy, Numeracy and
QAMSO Networks and Midlothian
Frameworks.
1.1.3 Revise
Midlothian’s
Learning, Teaching
and Assessment
policy. 
- Working group consultation started for
scoping of existing policy and school
based approaches to include all
stakeholders. 
- Progress update on key messages within
LTA Policy for school leaders and in
collaboration with EEG.
- School leader consultation to engage
working group. 
- Professional Learning Offer for school leaders on
strategic leadership of elements of LTA Policy
- Themes from Visit 2 (Focus 2.3) support with LA Self
evaluation of strengths and areas for improvement to
inform the final Policy.
- Ongoing stakeholder engagement to inform final
policy. 
- Final LTA Policy agreed for all school
engagement during session 2023/24
- QA Processes and analysis of schools
SQR  reveal an increasing percentage of
schools rated as good/very good for key
Quality Indicators.
- Consultation with school leaders and
networks to inform professional learning
offer for session 2023/24. 
Page 46 of 100

Page 47

3
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
1.1.4 Develop and
pilot an effective
tracking and
monitoring system,
incorporating
development of
stretch aims. 
- Work has started in scoping out the short
life working group to identify and review
remit for the project. 
- Pilot schools have been identified and
project plan has been developed to
ensure the progress can be monitored
and evaluated. Findings of this will be
presented to the working group 
- Pilot phase of work on implementation of
tracking and monitoring system with one
ASG will continue during this period.
- Monitor and review the impact of the
system within and throughout the schools.
- Working group will meet and discuss
options for primary and secondary schools
to take forward.
- Final phase of evaluation of the new system. Review
and consultation with working group and schools
involved.
- Any significant or minor changes to the approach to
be made before full implementation in all schools
next quarter.
- Training programme on the system to be planned
and scheduled with all schools.
- Full implementation of final tracking
system in all schools.
- Training programme on the system to be
planned by ASG and data champions to
take forward ownership within the school.
1.1.5 Support schools
and settings to make
best use of digital
tools to enrich,
enhance and improve
learning, teaching
and assessment 
- Working with schools to co-create short
term targets (Aug-Dec) to deliver
identified improvement priorities
- Tracking progress towards agreed
targets through school/setting Action
Trackers
- Provided Headteachers with relevant,
timely and succinct information for
session 22/23 HT pack
- Connected with Digital Leaders in every
school and establish a community of
innovative practitioners (97% turnout DL
Meeting 5 September)
- Surveyed pupils, families and staff to
understand the opportunities and
challenges of the Phase One provision of
EfL devices and plan next steps
- Deployment of devices to all new
Chromebook users, new pupils
- Creation of EfL Phase 2 plan for board
approval
- Relaunch Digital Loan Bank to ensure
schools and settings can access high
quality digital technology and training
- Pilot BGE Digital Literacy Framework in
primary schools and settings through
Digital Leaders
- Use staff audit from May 22 to explore
creation of a learning and teaching app
library for pupils and staff, ensuring DPIA
compliance
- Innovation project work in relation to EfL,
linking schools across Midlothian-
principally access to VR, creativity with
iPad in Senior Phase, Future Classroom
- Deploy devices to new P1 intake using
remote deployment model + flexible
support 
- Scoping of Roles and Responsibilities
between DS and DILT
- AV audit scoping- ELCs/Primaries and ASN
provisions by 30 Sept, secondaries by 14
Oct
- Review short term targets with schools and settings
against agreed measures and evaluate progress. Co-
create short term targets (Jan-June)
- Pilot Third and Fourth levels of Digital Literacy
Framework through secondary school working group
- Launch Google Workspace Skills for P7-S2 pupils to
establish a benchmark standard of fluency using
Workspace by end of BGE
- Review Professional Learning offer and plan for next
steps
- Evaluate impact of implemented changes
and use this to inform next steps
- Review and evaluate impact of Digital
Literacy Framework
- Finalise app library offer for 23/24 and
associated training offer
- Survey pupils, families and staff to
understand to identify changes in
attitude, proficiency and use of digital
tools to enrich, enhance and improve
learning, teaching and assessment
- Plan and host launch event for
Midlothian’s Apple Regional Training
Centre, showcasing the work of our
schools and settings and learning from
others
- Managed transition of all devices and
reallocation of school leavers’ devices 
Page 47 of 100

Page 48

4
1.2 Improve attainment within the senior phase by maximising opportunities through curriculum planning, consortium arrangements and partnership delivery,
including addressing the ASN Senior Phase Gap 
Trend Data & Targets for School Leavers 
2018 2019 2020 2021 Ave. Target
Lit & Num SCQF Level 4  88.93% 89.45% 90.48% 89.85% 89.93% TBC
Lit & Num SCQF Level 5 66.33% 63.76% 65.12% 66.36% 65.08% TBC       
1+ @ Level 4 97.23% 96.67% 97.17% 95.44% 96.84% 96.0%
1+ @ Level 5 85.49% 86.01% 84.43% 84.72% 85.56% 86.0%
1+ @ Level 6 60.58% 56.08% 60.62% 59.98% 59.19% 60.0%       
5@ Lv 5 60.58% 58.37% 63.45% 63.17% 60.86% 65.0%
3@ Lv 6 46.62% 42.89% 49.94% 47.66% 46.09% 50.0%
5@ Lv 6 32.56% 30.05% 36.94% 33.98% 32.33% 35.0% 
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
1.2.1 Develop and
implement a raising
attainment strategy 
- Consulted with school leaders on
strategy development 
- Key messages informed by data
analysis 
- QA Visit 1 started and will continue in
next quarter to reinforce stretch aims
and processes to monitor and track
- Draft strategy developed and shared with
stakeholders, HTs, parents and young people
- Literacy and Numeracy guidance in place
reflecting key pedagogical approaches outlined
in Draft Raising Attainment Strategy and shared
directly with English and Maths
Departments/DHT Networks.
- Attainment Visits and Secondary HT meetings
support school engagement with strategy.
- Data uplift shows a positive shift in attainment
predictions within the senior phase.
- Final agreed strategy in place. 
- Secondary School Improvement Reports
include evidence of approaches taken
and progress made towards stretch aims.
- School SIPs for 2023-24 reflect strategy.
1.2.2 Review the
Senior Phase
curriculum offer and
pathways into
positive sustained
destinations. 
- Started work on undertaking an
extensive engagement/listening
process with key stakeholders to
establish the vision and purpose of
the Midlothian Senior Phase
Curriculum 
- Identified and shared examples of
coherent curriculum pathways 3-18,
for example, in STEM or the world of
work. E.g. East Ayrshire flexible skills
pathway 
- Structure of Midlothian Curriculum
Paper established, will be drafted for
consultation at joint HT Meeting in
November
- Midlothian Senior Phase Principles agreed and
expressed through an explicit Curriculum
Rationale.
- Session 23/24 curriculum pilots agreed with all
secondary schools that ensure increased
opportunities for students and collaborative
working. 
- analysis of engagement and drafting of
Midlothian Curriculum Paper;  develop paper for
secondary pilots to consult with identified school
personnel 
- Deliver Leadership of Curriculum Design training.
Engage partners eg Education Scotland Curriculum
Innovation Team to support action research in
Curriculum Design. E.g. West Partnership
curriculum redesign project 
- School 23/24 SIPs reflect this approach
1.2.3 Review and
develop approaches
that will allow
secondary schools to
implement reduced
class contact time, in
line with SG policy, 
for teachers from
August 2024
- Review of curricular models and
staffing levels in each secondary
school has started. 
- Engaged with schools to model
options.   
- Engaged and involved the MNCT in
this process.
-  Agree a Midlothian approach to the student and
staff day, from August 2024, that ensures an
appropriate balance between equality across
schools and the context/need of each school. 
- Establish a paper to consult on within Midlothian 
- Confirm for each secondary school an action plan
that supports the transition to the agreed approach
from August 2024.
- Work with Business Executive colleagues to ensure
that our DSM model and allocations support the
implementation of approaches from August 2024.
- School 23/24 SIPs reflect this approach
Page 48 of 100

Page 49

5
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
1.2.4 Revise
Midlothian’s
Learning, Teaching
and Assessment
policy. 
- School leader consultation started to
engage working group. 
- Working group consultation and
scoping begun of existing policy and
school based approaches to include
all stakeholders.
-  Progress update on key messages within LTA
Policy for school leaders and in collaboration
with EEG.
- Professional Learning Offer for school leaders on
strategic leadership of elements of LTA Policy
- Themes identified as part of Visit 2 activity (Focus
2.3) support ongoing LA Self evaluation of
strengths and areas for improvement to inform the
final Policy.
- Ongoing stakeholder engagement to inform final
policy. 
- Final LTA Policy agreed for all school
engagement during session 2023/24
- Consultation with school leaders and
networks to inform professional learning
offer for session 2023/24
1.2.5 Develop and
pilot an effective
tracking and
monitoring system,
incorporating
development of
stretch aims. 
- Work has started in scoping out the
short life working group to identify and
review remit for the project. 
- Discussions have been held at the
secondary HT meetings to discuss
this project and how leaders can
contribute. 
- Pilot phase of work on implementation of
tracking and monitoring system with one ASG,
once governance has been agreed.
- Monitor and review the impact of the system
within and throughout the schools.
- Final phase of evaluation of the new system.
Review and consultation with working group and
schools involved.
- Any significant or minor changes to the approach to
be made before full implementation in all schools
next quarter.
- Training programme on the system to be planned
and scheduled with all schools.
- Full implementation of final tracking
system in all schools.
- Training programme on the system to be
planned by ASG and data champions to
take forward ownership within the school.
1.2.6 Support schools
and settings to make
best use of digital
tools to enrich,
enhance and improve
learning, teaching and
assessment
- Work with schools to co-create short
term targets (Aug-Dec) to deliver
identified improvement priorities has
started. 
- Tracking progress towards agreed
targets through school/setting Action
Trackers 
- Provide Headteachers with relevant,
timely and succinct information for
session 22/23 HT pack 
- Innovation project work in relation to EfL, linking
schools across Midlothian- principally iPad
Creativity Apps in the Secondary Classroom,
Future Classroom, Data Science Across the
Curriculum
-  Future Classroom in Partnership with University
of Edinburgh (UoE) defined Planning and
technical implementation in participating
secondary schools. The Collaborative enquiry
cycle takes place Oct-Dec
- iPad Creativity Apps in the Secondary
Classroom
- Support technical delivery of data science
projects in Newbattle High School and Roslin PS
- Implement innovation project work- Supporting
Music Technology in the Senior Phase
- Implement innovation project work- Supporting
Computing Science Qualifications in the Senior
Phase
- Continued work on iPad Creativity Apps in the
Secondary Classroom
- Continued work on Future Classroom
- Further development on Data Science Across the
Curriculum
- Review impact of all Senior Phase
innovation project work, evaluate
progress, plan next steps
- Managed transition of all devices and
reallocation of school leavers’ devices 
- Further development on Data Science
Across the Curriculum 
●  
Page 49 of 100

Page 50

6
1.3 Reduce the attainment gap between the most and least deprived children, including care-experienced children. 
Trend Data & Targets 
2018 2019 2020 2021 Ave. Target
Pr Literacy – GAP FSM vs. No FSM 22.47% 29.35% NC 32.24% 28.17% a 22%
Pr Numeracy – GAP FSM vs. No FSM 20.69% 22.69% NC 27.98% 23.82% a 20%       
S3 Literacy – GAP FSM vs. No FSM 22.57% 22.83% NC NC 22.94% b 17%
S3 Numeracy – GAP FSM vs. No FSM 12.04% 21.27% NC NC 16.35% b 17%       
1+ @ Level 4 – GAP FSM vs. No FSM  4.9% 2.0% 3.2% 3.4% 2.5%
1+ @ Level 5 – GAP FSM vs. No FSM  23.6% 25.2% 19.8% 22.9% 19%
1+ @ Level 6 – GAP FSM vs. No FSM  30.7% 32.0% 35.0% 32.6% 30%
a Ave. is calculated from 2017-2021; b Ave.  is calculated from 2017-2019
NC – not collected 
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
1.3.1 Build quality and
capacity within schools to
improve outcomes for all
disadvantaged children and
young people, in partnership
with our Education Scotland
Attainment Advisor. 
- QI school visits focus on raising
attainment and narrowing the attainment
gap has started and will continue in next
quarter.
- Visit 1 50% completed and focus on
QI1.1, 1.3 and 3.2, Discussions focusing
on raising attainment and identifying
learners gaps. 
-Recovery team working in 4 targeted
schools
- Further development of Midlothian’s
Professional Learning Academy which
will offer training, guidance and support to
school teams in improvement
methodology, measuring impact.
- Schools continue to monitor the impact of
interventions and universal offer on
reducing the attainment gap.
- QI school visits focus on evaluating impact
of work to reduce the attainment gap. 
- Summary report to capture the impact
of interventions and universal offer on
reducing the attainment gap.
1.3.2 Robust plans for PEF
implemented and evaluated
across all schools.  
- PEF plans discussed with head teachers
during QA process. 
- 60% of schools visited for SQIP feedback
and in all these schools PEF plans
discussed. 100% of PEF plans complete
and evaluated by SGM/AA. Visits to
identified schools to discuss plans post
Oct break.
- Schools continue to monitor the impact of
their PEF plans and interventions
planned.
- Engagement with schools through QA
process ongoing
- Schools evaluation of  impact of PEF plans
ongoing and evaluations discussed with
HTs prior to end of year school quality &
improvement report (SQIP) being finalised
- Schools evaluate impact of PEF plans
in end of year school quality &
improvement report (SQIP)
1.3.3 Improve availability,
accuracy and use of complex
and intersectional data to
target support more
effectively. 
- Development of interim analytical
dashboards for use by schools to
understand performance have been
progressing. 
- Engagement with schools and service
leads have taken place to start the
scoping and development of this work 
- Implement interim dashboard approach
for all schools. Training programme to be
scheduled alongside this with data
champions.
- Pilot implementation of full new analytical
dashboards for schools to align with the
new tracking and monitoring system and
actions 1.1.4 and 1.2.4
- Monitor and review the impact of the
system within and throughout the schools.
Any significant or minor changes to the
approach to be made before full
implementation in all schools next quarter.
(align with 1.1.4 and 1.2.4)
- Training programme on the system to be
continued with all schools.
- Full implementation of final analytical
dashboard to align with tracking
system in all schools.
- Training programme on the system to
be planned by ASG and data
champions to take forward ownership
within the school. 
Page 50 of 100

Page 51

7
1.4 Improved outcomes for vulnerable children and young people, and for those experiencing barriers to learning 
Trend Data & Targets 
2018 2019 2020 2021 Ave. Target
Pr Literacy - LAC/ASN Pupilsa  55.58% 53.26% NC 43.66% 47.61%a 53%
Pr Numeracy - LAC/ASN Pupilsa 61.48% 58.64% NC 52.18% 55.42% a 58%       
S3 Literacy - LAC/ASN Pupilsa 68.66% 87.67% NC NC 78.17% b 78%
S3 Numeracy - LAC/ASN Pupilsa 72.64% 68.32% NC NC 72.77% b 72%       
1+ @ Level 4 - LAC/ASN Pupilsa 91.79% 91.21% 92.95% 89.34% 91.32% 91%
1+ @ Level 5 - LAC/ASN Pupilsa 63.43% 69.23% 69.80% 67.44% 67.47% 69%
1+ @ Level 6 - LAC/ASN Pupilsa 32.09% 32.60% 43.96% 39.77% 37.10% 40%
a This contains pupils that are either LAC or ASN. Note that due to the small numbers in these categories the % can fluctuate quite significantly.
NC – not collected 
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
1.4.1 Embed The Promise
across the education service 
- Schools have started work on ensuring accurate
information of their care experienced CYP by
working closely with CS and SEEMiS
development officer. 
- Schools continue to extend their understanding
of The Promise through the Directorate
Conference. Directorate conference time and
date to be confirmed. This may be in Q3 or Q4. 
- New Education Resource Group process is
piloted. Two ERGs have been held. 21 CYP
discussed at the first ERG and 11 CYP
discussed at the second. Although it is in
development, the reduction in numbers supports
our aim to ensure our CYP get the right support
at the right time. The feedback from
establishments has been positive in supporting
the schools to support their young people.
- Use the data to target support in schools
that need this most in order to fully
implement The Promise, UNCRC and
GIRFEC. 
- Schools are trained in relationship/trauma
based practice
- Schools are embedding person centred
planning and decision making
- The PLA facilitates training on the right’s of
a child and the language of care
- Schools are consulted on the draft amended
exclusions policy
- Schools continue to extend their
understanding of The Promise through the
Directorate Conference
- Use the data to target support in
schools that need this most in order
to fully implement The Promise,
UNCRC and GIRFEC. 
- Schools are embedding in
relationship/trauma based practice
- QI school visits focus on ensuring
that schools are improving outcomes
for vulnerable CYP in line with The
Promise
- QI school visits focus on ensuring
care experienced young people are
receiving their entitlements
- Schools will embed the new
exclusion policy ensuring no formal
or informal exclusions of care
experienced young people occur
- Midlothian’s parent and carer survey
reports that parents/carers feel
involved in the decision making
process when planning the
educational outcomes for a CYP
- Midlothian’s pupil survey reports an
increase in the % of learners
reporting that they receive the right
support at the right time
1.4.2 Improve availability,
accuracy and use of complex
and intersectional data to
identify the attainment gaps
for young people with
additional support needs and
other barriers to learning.
- Work has started to build a tracking and
monitoring system which can provide
intersectional data to allow schools to produce
an annual equalities report. This has been
developed through engagement with the ASN
central team.
- Work on developing the data dashboard will
continue, through engagement with the
service and schools.
- Annual equalities report training for school
leaders.
- Adapt SQuIP to include equalities report. 
School leaders use the intersectional
data to produce an annual school
equalities report within SQuIP and set
out what action they will take in the
year ahead to reduce equalities
issues. 
- All schools to use the tracking and
monitoring system to understand and
target interventions to young people
1.4.3 Pilot resource guidance:
‘Identifying, Assessing and
Providing for Additional
Support Needs’. 
- Working group to agree the draft policy on
‘Identifying, Assessing and Providing for
Additional Support Needs’ 
- Training held and attended by over 50 members
of staff across the establishments. This is to
engage on the new guidance, policies and
procedures around supporting CYP with ASN
- ‘Identifying, Assessing and Providing for
Additional Support Needs’ draft policy
shared with schools
- Short life staff  consultation group is formed
to give initial feedback on the new guidance,
policies and procedures
- Short life parent/carer and pupil consultation
group is formed to give initial feedback on
the new guidance, policies and procedures
- All schools to pilot the draft policy on
‘Identifying, Assessing and Providing
for Additional Support Needs’
- Schools provide final feedback on
guidance, policies and procedures to
enable a final draft to be created
session for 23/24
Page 51 of 100

Page 52

8
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
1.4.4 Establish an Education
Resource Group to ensure a
timely multi-agency response
to assessing and providing
for young people’s additional
support needs. 
- Request for support in education panel has
been identified. Multi-agency panel in place
consisting of Education, Children and Families,
Educational Psychology and Health. 
- Request for support paperwork shared with all
Head Teachers for feedback 
- Education Resource Group panel meetings has
begun
- Request for support panel meetings occur
fortnightly with minutes saved onto SEEMiS
- P7-S1 request for support transition panel 
- Schools are issued with request for support
guidance and paperwork
- N-P1 request for support transition
panel 
- QI visits to focus on the assessment
of need and response to providing
support
- Staff survey to measure the
effectiveness of the new procedure
and measure impact on the CYP
1.4.5 Review Support for
Learning practice to ensure
capacity of workforce,
consistency and quality. 
- Continue SfL network and extended to
secondary colleagues. This will continue
throughout the session. 
- SfL network identified key CLPL opportunities
required. Responses from the SfL teachers
vary, however Dyslexia training has been
identified as a key training need to ensure
consistency across Midlothian in identification. 
- PLA facilitate CLPL opportunities
- SfL network, including representation from
LAs,  to draft a SfL guidance paper
supporting staff to understand 5 roles of SfL, 
- QI visits to focus on the SfL practice
and quality assure the data to
measure the impact of interventions
- SfL guidance paper to be finalised
and shared ready to embed in
session 23/24 
Page 52 of 100

Page 53

9
Midlothian Single Plan Priority Reducing the gap in health outcomes 
Priority 2: Included, Involved and Engaged: Wellbeing & Equity 
2.1 Improve Equity and Inclusion 
Trend Data & Targets 
2018 2019 2020 2021 Ave. Target
Pr Attendance Rate 94.43% 94.70% 94.04% 95.06% 94.56% 95%
Sec Attendance Rate 89.18% 89.20% 89.37% 90.99% 89.69% 91.5% 
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
2.1.1 Extend
professional learning
offer to promote
nurturing, trauma-
informed practice
across schools and
settings.  
- Nurture Strategy has had first meeting to work on
agreeing priorities/actions. ASG meetings have
helped to clarify next steps based on priorities
- Professional development planning underway. 
- Nurture lead meetings re-commence with plan
mapped out for the year.
- Launch of webinars and training options supported
by practice guides and digital resources.
- Follow up opportunities (reflection
circles) to enable focused case
discussions and problem solving. 
- Exploratory research project into the
supervision and support needs of those
staff working with children presenting
with significant emotional distress.
- Facilitate shadowing opportunities for
staff involved in enhanced nurturing
roles (eg. guidance teachers, nurture
staff, residential staff) followed by
collaborative enquiry opportunities to
reflect on learning. 
- Review of learning and identifying
needs to inform planning for 2023-24.
2.1.2 Revise
Attendance Strategy
in partnership with
Children’s Services 
- Attendance Strategy has had first meeting to agree
priorities/actions. 
- Attendance procedures are under review.
- Engagement strategy is being developed with
children and families 
- Attendance consultation group to analyse
attendance data to support the identification of
barriers to attendance, identify what’s working and
gaps in services and support.
- Engage with young people about barriers to
attendance and factors that promote school
attendance.
- Pilot approaches based on relational, practical and
psycho-educational support to promote attendance.
- Attendance strategy updated and
shared with all relevant stakeholders
- Co-produce attendance practice
guidance that provides consistent,
evidence-based pathways to promote
attendance.
- All schools to ensure the attendance
strategy is fully embedded within their
establishment
2.1.3 Develop a
comprehensive
Family Learning
Strategy 
- Draft Family Learning Strategy through multi-
agency co-production. Strategy group extended to
widen range of members and include CLLE,
Education staff and young people, CSs and third
sector.
- Strategy document recirculated to group with
focused questions for consideration. 
- Workshop session planned.
- Family Learning workshop session to be held with
multi-agency group. Education Scotland Family
learning material to be used.
- Action plan created after co-production session.
- Link with Parental and Learner Engagement
Strategy work
- FL Strategy agreed and disseminated.
- Support implementation.
- Development of a central source of
information about Family Learning offer
in Midlothian.
- Undertake consultation with
stakeholders about availability and gap
across Midlothian. Revisions made to
improve awareness of family learning
and engagement in opportunities.
2.1.4 Develop ASD
Strategy 
- Work on this has been paused due to priority taken
on the development of exclusion policy.
- Working group formed to create a Draft ASD
strategy in partnership with Health and Social Care
to be written and shared with all relevant
stakeholders
- CLPL opportunities identified, PLA to facilitate
identified training needs
- Review and clarify role and responsibilities within
the neuro-developmental pathway
- Pilot ASD strategy across the
directorate
- PLA to facilitate identified training
needs
- Finalise and embed ASD strategy
across the directorate
- Apply to be an ASD friendly local
authority
2.1.5 Mental Health
strategy established 
- Mapping activity has begun to gain clear picture of
the support in place for wellbeing and mental
health at universal, universal+, targeted and
specialist levels.
- Mapping activity had also begun to gain clear
picture of level of need amongst children and
young people and gaps in provision and services.
- Survey schools to gain an overview of the
therapeutic services that schools procure.
- Analysis of need and services available. 
- Seek children and young people’s
views about what’s working and not
working in the support for wellbeing
and mental health.
- Identify children and young people
reference group to support strategy
development.  
- Development of strategy 
Page 53 of 100

Page 54

10
2.2 Children have a greater understanding of their rights (UNCRC) and these rights are being met across our establishments 
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
2.2.1 Carry out a
Children’s Rights
Review with CYP and
staff across
Midlothian, set against
the 7 principles of a
rights-based approach  
- Created the Mental Health &
Wellbeing Survey (p1-3; p4-7; S1-
S3; S4-S6; early years & Saltersgate
focus group questions) with
questions featured connected to the
7 principles of a rights-based
approach. 
- Launch the Mental Health & Wellbeing
Survey.Create a criteria & evaluation for the
Children’s Rights Review based on long-term
aims of Midlothian Children’s Rights Strategy &
7 principles of a rights-based approach.
- Liaise with QIOs organising QI Visit 2
(Learning and Teaching) to embed questions
around children’s rights into every school visit.
- Identify Rights-Respecting School leads.
- Identify schools in each ASG to review in
terms of highlighting good practice and assets
to build on within Midlothian.
- Identify and coordinate Children’s Rights
Review teams.
- Conduct Children’s Rights Review visits within
identified schools.
- Identify and facilitate focus groups of children
& young people, families, and stakeholders.
- Hold Learner & Parent Conferences and gain
views around the long-term aims/vision of
taking a rights-based approach in Midlothian,
to feed into Children’s Rights Review.
- Collate, analyse & evaluate data from reviews.
- Create feedback summary from reviews per
ASG (including next steps/recommended
actions) 
- Attend ASG meetings to share feedback
summaries with HTs. 
2.1.2 Develop and
implement the
Midlothian Children’s
Rights strategy across
the Directorate, in
partnership with
Children’s Services &
CLLE. 
- Identified Steering group
consultation teams to consult with to
consider long-term aims/vision of
strategy (made up of key
stakeholders: Central team;
Education Scotland; School staff;
Parents; Young People). 
- Initial meetings with Steering Group
consultation teams held and planned
with all teams.
- Meet with Steering Group consultation teams
to revisit the long term aims and vision as
thinking progresses.
- Start to hone into where Midlothian would like
to be in 5 years time.
- Create Happy, Safe & Thriving (HST) ASG
working groups.
- Create terms of reference for HST ASG
working groups.
- HST ASG working groups to analyse feedback
summary and create action plan/next steps for
their ASG in terms of professional learning. 
- Follow-up focus groups about Mental
Health & Wellbeing Survey with S4-S6
about exam stress, and S1 transitions, to
feed into ASG working groups connected
with implementing the Midlothian
Children’s Rights Strategy. 
- HST working groups to implement actions
created. 
Page 54 of 100

Page 55

11
Priority 3: Self-improving Systems  
3.1 Leaders at all levels work together within an empowered system to improve outcomes for children, young people and families 
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
3.1.1 Comprehensive
professional learning
opportunities to improve
quality of leadership at all
levels, including
leadership of learning. 
- Developed a leadership continuum for
Midlothian’s schools and ELC funded provider
partner managers. 
- Introduction of SEIC leadership offer. Co-
created the programme with headteachers. 
- EYs leadership training for SEYPs, EYOs
carried out 
- HT peer induction set up: 5 new HTs are
matched to experienced HTs/ QIO. Support
pack with suggested operating model sent out
and support offered if required. 
- The four DHT Network meetings No.1 took
place in September 2022. Meeting 2 dates in
diary for November 2022. Co-constructed with
DHTs. 75 DHTs/ PTs signed up with 85%
attendance at meeting 1 in Sep 2022.
Feedback was very positive with suggestions
for future foci.   
- Phased introduction of PLA offers.
- Delivery partnerships established within
the PLA.
- Delivery of SEIC leadership offer.
- Phased introduction of Professional
learning Academy offers.
- Delivery and evaluation of SEIC leadership
offer. 
3.1.2 Deliver a minimum
data set and support data
literacy to improve self-
evaluation through
leadership professional
learning and data
champions. 
- Principal data officer & QIOs created a
strategic plan for data improvement for the
directorate, with specific projects identified to
take forward improvement in this area. This is
led on three main pillars of data infrastructure
& systems, data management and data
culture. 
- Data QIO team and principal officer have met
to ensure consistent approaches and
messaging to schools during QA visits. 
- Data lead for Midlothian attends the SEIC
Data & Analysis Network 3-monthly meetings
where good practice and support is shared.
- Establish a data champions network and
co-design job description, job tasks,
training and evaluation arrangements
- Data lead for Midlothian attends the SEIC
Data & Analysis Network 3-monthly
meetings where good practice and
support is shared.
- Data champions network meetings continue
training and data tasks. 
- Data lead for Midlothian attends the SEIC
Data & Analysis Network 3-monthly
meetings where good practice and support
is shared.
- End of year evaluation and co-
create 2023-24 activities.
- Develop programme of training
with professional learning
academy for 2023-24. 
Page 55 of 100

Page 56

12
3.2 Children and families participate in, influence and inform how we deliver our services 
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
3.2.1 Refresh the Midlothian
Parental Involvement and
Engagement Strategy. Co-
create this with Midlothian
parents using the National
Community Engagement
guide. 
- The results of the PIE Survey 2022
have been analysed to find out where
improvement in PIE is required
across Midlothian. 
- Discovery has been undertaken to
find and share examples of good
practice in parental engagement.
This has been used to inform the
Midlothian approach. 
- Share the PICL (Parents’ Involved in
their Children’s Learning) approach.
Network meetings held termly to
share practice.
MLC presented research at 
Midlothian event and at an
international conference in August.
- Form a PIE steering group with parent
and staff representatives from all 6
ASGs.
- Co-create PIE steering group action
plan.
- Audit Parent Councils’ equity of
representation amongst office bearers
and for attendance at PC meetings. 
- Implementation of PIE steering group action
plan.
- Use PC Equalities Audit to adjust PC
guidance, recruitment & promotional
materials. 
3.2.2 Learner Engagement
Strategy 
- Identified priorities through baseline
engagement strategy co- created
with children and young people   
3.3 Quality Assurance activities lead to improvements in the quality of education provision across settings and schools 
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
3.3.1 Quality Improvement
framework in place 
- Schools and ELC settings implement
the QA Framework. 
- Initial self evaluation/ support and
challenge documents available for
reflection against in google drive.
- Schools and ELC settings implement
the QA Framework and begin to align
school and ELC settings processes.
- Feedback via EEG on
format/organisation of visit 1 activity as
vehicle for gathering required data.
- Schools and ELC settings implement the QA
Framework.
- Feedback via EEG on visit 2 activity. 
- Evaluate the QA Framework with head
teachers and centre managers at the
end of year. 
3.3.2 Programme of quality
assurance activities 
- Visit 1 documentation prepared in
consultation with school leaders/EEG 
- QA visit 1 using the new framework to
all schools and ELC settings, which is
continuing into the next quarter.
- QA visit 2 with a focus on Q.2.3  leads
to clear LA self-evaluation of progress
in schools relating to Learning,
Teaching and Assessment.
- Key messages from visit 2 activities
inform LA LTA Framework
- QA visit 3 provides schools, ELC settings
and LA with a clear picture of progress in
raising attainment as well as improvement
over time.  
- Final QA programme agreed and in
place for future sessions, able to
support with provision of clear
information regarding  capacity for
improvement for our schools and ELC
settings related to key QIs. 
Page 56 of 100

Page 57

13
Midlothian Single Plan Priority Reducing the gap in economic circumstances  
Priority 4: Life-Long Learning and Career-Ready Employability  
4.1 Children and young people are well prepared for the world of work 
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
4.1.1 Analyse opportunity
data to inform which
careers offer the best
opportunities for
Midlothian’s CYP over the
next 10 years. 
- Analysed and shared opportunity
data to inform - review of Midlothian
curriculum frameworks and ASG
curriculum pathway. 
- Align curriculum pathways with
career range indicated by
opportunity data.  
- Work with FHE partners to improve
career pathways school to FHE (eg
lack of Fin Tach, Food Tech & HSD
courses)
- Engage with Skills Investment
Plans for City Deal region to
ensure we have Midlothian career
pathways aligned. 
- Undertake ADES led review into
Midlothian Positive Destination
trends, with a focus on establishing
actions to increase numbers
moving into Higher Education.  
- Align curriculum pathways with
career range indicated by
opportunity data.  
- Medium Term Strategy and
associated Action Plan agreed with
all stakeholders to reflect
outcomes from ADES Review.
- School 23/24 SIPs reflect this
approach
4.1.2 Embed My World of
Work (MWoW) into the
curriculum of every school 
- No progress as yet due to
identification of resource allocation
on this action 
- Audit how many schools have
embedded MWoW into their
curriculum.
- Support remaining schools to
embed MWoW into their
curriculum.
- Meet with SDS to target support
where it is needed.
- Support remaining schools to
embed MWoW into their
curriculum.
- Meet with SDS to target support
where it is needed. 
4.1.3 Further develop
bespoke Skills
Development Scotland tutor
and mentoring support for
senior phase secondary
students
- Audit underway of how many schools
are providing tutor and mentoring
support and to how many young
people. 
- Support remaining schools to
provide tutor and mentor support. 
- Meet with SDS to target support
where it is needed.
- Support remaining schools to
provide tutor and mentor support. 
- Meet with SDS to target support
where it is needed. 
Page 57 of 100

Page 58

14
Priority 5: Finance & Resources  
5.1 Deliver Best Value through: 
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
5.1.1 Learning
Estate 
- Learning Estate Strategy being
formulated to deliver best value.
- Dependent on the approval of the
Learning Estate Strategy,
programmes of work to be
developed.
- As Q3 - Provide update on LES progress.
5.1.2 DSM Review  - DSM has been updated to reflect
current landscape.  
- ELC DSM under consultation.  
- Complete the ELC DSM
consultation.
- Finalise the ASN DSM
- Complete the ASN DSM
consultation. 
- Continue comms and roll-out of
DSM 
5.2 Equipped for learning: 
Key Actions Q2  - Progress achieved Q3 – Planned activity Q4 – Planned activity Q1 23/24 – Planned activity
Transformation 
Devise and deliver Phase Two of the
Equipped for Learning project to
ensure positive, sustained impact for
children and young people 
- Scope Phase Two priorities within and beyond
project team
- Create Phase Two plan with associated
detailed action plans for each identified
workstream
- Present Phase Two plan to EfL Board for
approval
- Review forecast expenditure in line with
Phase Two priorities
- Delivery of workstream actions as
detailed in EfL Phase Two project
plan 
- Delivery of workstream actions as
detailed in EfL Phase Two project plan
- Delivery of workstream actions as
detailed in EfL Phase Two project
plan
- Review of Phase Two and scoping
for Phase Three
Asset Management 
Confirm asset management strategy
including investigating provision of a
device when a pupil leaves school and
develop agreed deployment plans
then Implement. 
- Laptop refresh schedule to be implemented -
every 5 years
- PC refresh schedule to be developed and
implemented
- Engage with teachers on the use of PCs in the
classroom and the requirements for these
devices
- iPad / Chromebook refresh schedule to be
established and documented
- iPad / Chromebook refresh schedule to be
implemented
- Develop reporting and governance
on asset disposals, breakages,
failure rates, replacements etc
- Monitor refresh schedule to be
developed and implemented.
AV refresh schedule to be developed
and implemented
Storage and Back Up 
Review/update record management
policy, confirm
document management approach, tidy
data in line with RMP,
migrate data to central servers and
then decommission old servers;
- Commence full data cleanse of data held in
schools, starting with non-essential photos
and videos
- Define and agree upon reporting
on data utilisation / cleansing
progress
- Formulate rules for deletion: age,
impact on records management
obligations, size
- Centralise storage on centrally managed
servers.
- Assess volume of storage required on
the basis of the outputs of the data
cleanse process
- Assess options - servers held in high
schools on behalf of primaries vs servers
held centrally on behalf of all schools
- Procure and implement new hardware 
Page 58 of 100

Page 59

15
explore back-up solutions for email
and drive/workspace, confirm solution
and implement. 
- Migrate data from existing servers to
new servers
Security 
Identify a solution/tools MDM, DLP and
Other to prevent data from being
copied into a personal app. Investigate
& implement CASB, 2FA &
Data
Classification within Workspace  
- Identify Security work packages that
need third party support / procurement
- Identify MDM / DLP tools and solutions
to prevent data being copied out of the
workspace onto personal apps
- Investigate alternative inbuilt controls to
overcome MDM risks in non-
Windows/Chrome user environments 
Network and Wifi 
Develop Network Wi-Fi requirements,
develop Network/Wi-Fi forecast
model with scenario planning
capability to proactively plan capacity.
Wholesale update of Wi-Fi Network 
- Deploy Lightspeed network
- Roll out Windows / Mac Lightspeed
agent
- Deploy Network Agent Lightspeed
DNS Proxy in schools
- Roll out Lightspeed BYOD network  
Audio Visual 
Define how teachers could/should use
Chromebooks and AV  for each
type of learning setting. Define
requirement for AV service offering.
- Select provider for school AV equipment
- Complete full mapping of existing AV
equipment
- Develop joint working protocols between
Digital Services and Digital Inclusion ad
Learning Team
- Carry out focused engagement
with teachers to define use,
requirements and board selections
- Audit current estate
- Formulate scope and spec for
Connected Classroom as part of
Innovation project work
- Deliver Connected Classroom pilot
in six sites
- Conduct change management in all
schools
- Procure all hardware through Scotland
ESL Framework
- Agree installation plan with chosen
supplier
- Review support arrangements for
software updates 
- Carry out installation
Identity 
Build a case for change, develop
options assessment and business
case. Implement simpler corporate
wide identity solution to education 
- Conduct a survey of outstanding
issues between AD and other
environments - highlight current
pain points
- Consider policy and parameters
relating to access for third parties
(eg Edinburgh Chamber of
Commerce, LEAPS, CLL, NHS)
and internal staff who need access
to the domain
- Review interim arrangement for
managing issues related to accounts and
identities
- Implement identity solution 
Support 
Review support processes, where best
placed to sit. Update Service Now
to allow Digital Learning access.
Confirm Governance process on
managing and tracking of assets. 
- Define interactions between Digital Services
and Digital Learning, with each workstream
taking responsibility for its own interactions
- Investigate the use of Service Now to deliver
Digital Learning support, providing schools
with a single point of contact
- Review as-is resourcing model for
support activities and forecast to-
be resource requirements.
- Set up regular comms, reviews
and engagement processes
between Digital Learning staff,
help desk staff, and technologists 
- Assess the viability of using Service
Now to deliver Digital Learning support
functions
- Carry out trial run of Service Now for
delivery of support functions
- Carry out change management for
migration to Service Now
Potentially migrate Digital Learning
support functions to Service Now
•  
Page 59 of 100

Page 60

16 
02. Challenges and Risks
22/23: 
- Outcome of the Education Reform Consultation and National Care Service Consultation 
- Uncertainty about how SQA qualifications will be assessed going forward in the future. 
- The continuing impact of the pandemic on attendance and on post-school destinations 
- Midlothian Council has a relatively high proportion of funded ELC places delivered by partners in the private and voluntary sectors. As such, any increases
in the rate that is paid to funded providers would create additional upward pressure on the early years budget for 2022/23. 
- Rate of demographic growth on the learning estate 
- A full refresh of school roll projections and capacities has been undertaken to assess current and future demand. This work will inform and shape the
Learning Estate Strategy over the next 5 years. 
- A number of schools funded through the Scottish Governments Learning Estate Investment Programme are at the briefing and design stages. There are
council and developer funded projects being undertaken also. 
- The Roll Projection data will be checked and refreshed on a 6 month basis to ensure we have provided sufficient capacity in each catchment. There are a
number of schools with imminent capacity breaches.
- A programme of Suitability Surveys will be conducted in 2022 to ensure our Core Facts data is reflective of the current situation. 
- The Place Directorate are conducting Condition Surveys in all schools assets. 
- Increase in the number of children and young people with additional support requiring more specialist provision will require robust monitoring to ensure
staffing and specialist facilities meets level of needs  
- There are a number of Scottish Government consultations, on issues such as school uniform and physical restraint, that are ongoing which may result in
change in education policies for this coming session and beyond. 
- There is a financial challenge to deliver statutory services given the current budget gap.
- Due to the current financial climate there may be an impact on services as a result of the cost of living and increase in poverty. 
Page 60 of 100

Page 61

17   Page 61 of 100

Page 62

18  Page 62 of 100

Page 63

1
Place Performance Report Quarter Two 2022/23
Challenges
Inflation as well as rising energy costs are affecting the construction industry in Scotland and
the UK is currently experiencing unprecedented adverse market conditions, leading to
significant rises in tender prices for a wide range of materials. There is evidence that
inflation of between 10% and 15% beyond BCIS predictions is affecting projects. Whilst
measures such as value engineering are partially mitigating cost increase there is a risk that
the capital budgets will need to be increased with a resultant impact on the funding
strategy. The situation continues to be monitored however it is necessary to revisit existing
capital plans and also review the 2022/23 service budgets and implement savings measures
in the year.
The current year’s budget, 2022/23, approved on 15 February 2022, was reliant on £12
million of one off funding measures. As reported at Council in October 2022, on the
assumption that funding flexibilities will offset any unfunded costs associated with current
pay offers and that there no further unfunded costs, the figure is now projected to be
£10.600 million. That is the extent to which the recurring expenditure in the current year’s
budget is financed by non-recurring funding sources. 
As a consequence of the inflationary increase in costs and the cash flat grant settlements,
the projected budget gap for 2023/24 now stands at £11.084 million rising to a projected
£23.154 million by 2027/28, albeit later years are based on the existing service
responsibilities with no adjustment for the consequences of the National Care Service
(Scotland) Bill. These budget gaps represent the extent to which recurring service
expenditure is projected to exceed recurring income for future years.
The Scottish Government’s Resource Spending Review (RSR), published on 31 May 2022,
presented very challenging financial planning parameters for Local Government. It indicated
cash flat grant settlements through to 2025/26 with a £100m increase for 2026/27.
Commentators on the RSR have recognised the impact on Local Government, with both
SPICe and the Fraser of Allander Institute stating that the proposals essentially represent a
7% real terms decrease in funding between 22/23 and 26/27. This is in contrast to the 4.7%
real terms increase that the Scottish Government will see overall (2% if social security
transfers are excluded), and the real terms increases that Health, Social Justice and Housing
services will see. The real term decrease planned for Local Government comes on top of
significant real term reductions since 2013/14, which has driven ongoing reform,
rationalisation, innovation and transformation work across Local Government. 
The Scottish Government’s National Care Services (Scotland) Bill, if enacted, would have
fundamental implications for the community and for Local Government itself.  The wide
reaching changes in the bill aim to deliver a National Care Service by the end of the
parliamentary term, which will impact on all aspects of the work of the Corporate Solutions
team, including financial implications, in both revenue and capital, our asset base, our
workforce, governance and legal arrangements and our digital infrastructure and platforms.
It will require an immediate focus for the foreseeable future and this will inevitably have
implications for other priority work at a time of continued resource constraint.
Cabinet
Tuesday 29 November 2022
Item 5.6
Page 63 of 100

Page 64

2 
Place is where people, location and resources combine to create a sense of identity and
purpose. The Place service ambition is to deliver joined-up, collaborative, and
participative approaches to services, land and buildings, across all sectors within a
place, enabling better outcomes for everyone and increased opportunities for people
and communities to shape their own lives. 
We have endorsed the place principle because we are committed to strengthening the co-
ordination and integration of all place based activity. The principle is a way of bringing
together ideas about services, investments, resources and assets to achieve a shared vision.
We are creating a shared understanding of what a place is for and what it wants to become
with partners and communities collaboratively agreeing the joint actions required to make
that happen and delivering these. This approach provides our key stakeholders with a way
to exercise local or regional accountability over decisions taken about the way resources,
services and assets are directed and delivered. 
In implementing the place principle we: 
• consider the benefits of planning, investment and implementation activity at the
regional level of place - where that focus could drive faster rates of sustainable and
inclusive economic growth
• ensure that place based work at the local level being led by Midlothian Council and
its agencies/partnerships is taken forward in a way that is integrated and
complementary of all the work being taken forward in associated policy areas and
plans
• exemplify the behaviours reflecting the core of the principle, working and planning
together with our partners and local communities to improve the lives of people,
support inclusive growth and create more successful places.
Over recent years, innovative ways of working have been introduced and services adapted
at pace to respond to the needs of our citizens, in particular those experiencing the
greatest levels of poverty and inequality. This has resulted in a complete transformation of
how the Council works. Our services are continuing to build on this learning moving
forward, harnessing the energy, flexibility and creativity demonstrated by our workforce,
to embed a culture of continuous improvement and innovation across Place. 
Hub and Spoke, one of Midlothian’s key drivers for change, will see a locality approach to
service delivery adopted, developed in conjunction with community planning partners. The
opportunity to review and redesign services will result in a more efficient and effective
operation of sites within local communities. This will improve service delivery, and ensure
better outcomes for local communities. The continued rollout of enhanced ICT capabilities
will strengthen cross service working, produce resource efficiencies and support the
localisation of services.
Quarter 2 (July – September 2022) was a challenging quarter for Place as it continues to
support post-pandemic recovery, operate a business as usual approach to service delivery
and progress a range of transformation projects. 
Page 64 of 100

Page 65

3
Environmental 
Midlothian Council was one of the first local authorities to sign Scotland’s Climate Change
Declaration, publicly acknowledging the challenges and opportunities that climate change
brings with a commitment to make the Council’s activities net zero carbon by 2030. Work
continues to implement the Council’s Climate Change Strategy and focus continues within
Place services to achieve future emissions targets.  The ambitious strategy sets out how we
will reduce our greenhouse gas emissions, encourage and work with others in our
community to mitigate and adapt to changing climate. The strategy incorporates an action
plan with a number of initiatives and ongoing programmes which together are helping to
reduce our emissions and carbon footprint. The annual progress report on Climate Change
was presented to Cabinet at its meeting of 18 October 2022. 
Economic Development continues to promote the Midlothian Carbon Pledge, culminating in
a virtual business event during Carbon Week. There are now 36 businesses committed to
the Carbon Pledge, which is now a prerequisite for any businesses looking to secure grant
support from the LACER Green fund. 
Work continues with Midlothian Energy to develop business case options for addressing
building fabric and energy decarbonisation of the existing estate. Good progress has been
made with City of Edinburgh Council to secure the site for the new Midlothian Energy
Centre at Millerhill, as a key step in the delivery of District Heating at Shawfair.   
The annual Capital Works Programme for carriageway resurfacing continues to make good
progress this quarter with 9.43km of carriageway resurfaced over Q1 and Q2 (1.38% of the
total road network). Our initial annual target of resurfacing 1% of the total road network has
been achieved and a new revised target of 2.2% has been set for the remainder of the year. 
In addition 1.88km of footways were resurfaced to the end of this quarter (0.27%), bringing
this indicator back on target. 
Work is progressing to offer a reuse cabin at Stobhill Recycling Centre for the collection of
household bric-a-brac for “play through learning”. The reuse cabin is expected to reopen in
Q3. 
A further 319 customers have signed up to the chargeable garden waste collection service
this quarter. The service has a total of 18,563 customers and 19,639 bins. Domestic residual
waste collection tonnages remain high, which is a continued trend from the COVID-19
pandemic effects. Recycling rates are estimated to have increased over Q1 and Q2 quarter.  
With support from our volunteers at both locations, Vogrie Country Park and Loanhead
Memorial park received green flag awards this quarter. Land Services continue to progress
projects across Midlothian including a new play area in Waterfall Park, community garden in
Penicuik, Burnbrae Primary School play area, Danderhall Pavilion play area and new
equipment installations as part of Scottish Government’s capital spend on play
improvements. New path works at Straiton pond were completed this quarter. 
Overall grounds maintenance standards have been good this year. The dry weather in Q2
reduced grass cutting requirements. Working towards Midlothian’s aim to be Carbon
Neutral by 2030, Land Services have purchased additional battery powered small plant and
machinery and a large charging unit which records and reports on carbon savings made. In
Page 65 of 100

Page 66

4
Q2 the operation of Pellenc battery operated equipment resulted in a 334.8kg reduction in
Co2 emissions and also provided an equivalent saving of £223.00 in fuel costs. 
73% of public health requests were responded to this year, which is similar to that
responded to in Q1 21/22.  In the previous year the service was impacted by the diversion of
Environmental Health resources to proactively deal with the COVID pandemic. This figure
reflects those cases where response has been recorded in the Data Management System.
EH service is further impacted by a number of staff vacancies. 
As part of the Environmental Crime Strategy a procedure to deal with abandoned vehicles
has been developed and implemented. Within Q2, 54 requests for service have been
received. 
Economic and Regeneration 
Midlothian Council’s Economic Renewal Strategy sets out our ambitious approach to
managing the transition from lockdown and planning for the longer term challenges the
local economy will face. The strategy aims to mitigate the adverse economic impact on the
local economy from COVID-19. Key aims are to protect jobs and aid business recovery using
a place based partnership approach that maximises the opportunities developing from the
pandemic. Taking this partnership approach, the strategy will foster entrepreneurship,
upskilling and training, addressing gaps in the market and changing the way business is
done to better align this to customer behaviour. Alongside support for agriculture, tourism
and the leisure and hospitality sectors, the council will also promote local jobs and self-
employment opportunities, particularly for young people, to give them the necessary skills
and support they need to benefit from economic recovery. A report on EU-Exit impacts and
the economy was presented to Council in October which will inform the refresh of the
Economic Strategy to be presented for approval to Council in early 2023. 
The Business Gateway service continues to be digitally delivered. The number of new
business start-ups has dropped for the quarter. Concerns around EU Exit and post COVID
trading conditions is a probable cause. The cost of living is having an effect on businesses
and will continue to do so. There is an atmosphere of uncertainty, which results in less
investment in people or capital and a resulting decrease in growth. The increase in costs of
doing business, especially fuel, raw materials, import duties and availability has had a big
effect on trading and will continue to affect growth. However, there is a strong pipeline of
“pre-start” businesses engaging with the Business Gateway service with a resulting spike in
starts for the next quarter expected. 
Advisers have attended local networking events with partners to increase service reach. The
use of the Gateway CRM has improved the quality of reporting and data available to
Midlothian Council on business trends. The Social Enterprise development events have
continued to stimulate interest in social enterprise as a business structure. This quarter,
Business Gateway has supported 14 clients that were unaware of the model but did have
social or environmental aims, and this includes 2 enterprises that are “spin offs” from Local
Authority teams. One of the local social enterprises was visited by Louise Macdonald,
National Director for Economy, for the Scottish Government. 
Plans are in place for the virtual delivery of community enterprise sessions across
Midlothian in 2022/23 contributing to Community Wealth Building objectives.  The Locate in
Page 66 of 100

Page 67

5
Midlothian website continues to be a valuable tool for employability opportunities and
employment support with 4,075 website visits this quarter. Each social media channel is
targeting different audiences and each is performing well in terms of audience growth and
interaction with 1,828 ‘Business Gateway Midlothian’ followers and 1,695 ‘Locate in
Midlothian’ followers across Facebook, Twitter and Linkedin.   
This quarter saw the introduction of a procurement mentor service to the client journey
providing 1-2-1 support in public sector tendering, with the aim to increase the volume and
quality of local bids.  Clients are being referred via the Business Gateway Advisers and
already feedback is showing interest in this service. Business Gateway will continue to
promote to clients and work to develop the mentoring offering, as well as work closely with
the procurement team to implement the local procurement strategy. 
We have continued to maximise opportunities to support recovery of the tourism sector by
supporting the development of the tourism forum’s digital presence and representation on
the steering group. A £10,000 grant to the Midlothian Tourism Forum will allow the forum
to design and build a website to increase membership and interest. The new Economic
Strategy planned for 2023 approval will include Tourism, Culture and Heritage.  
At its meeting in August 2022 the Planning Committee considered a report that highlighted
that the Council has secured £9.5m and also received £12.1m in developer contributions
towards infrastructure and local facilities for the period 2021/22. Planning permission has
been granted for the erection of 100 dwelling houses and associated works on the ‘Doctor’s
Field’, Rosewell and planning permission has been granted for 430 dwelling houses at land
at Cauldcoats, Danderhall. 
Whilst work is progressing to develop proposals for the Hopefield Economic Development
site in conjunction with the Development, the estates team have been successful in
acquiring a mixed Industrial and office development adjacent to the Council’s existing
Hardengreen Industrial Estate. This represents a further expansion and diversification in the
style and size of units the Council will be able to make available to support growing
Midlothian enterprises.  
Housing and homelessness 
Midlothian Council’s updated Rapid Rehousing Transition Plan (RRTP) was submitted to the
Scottish Government at the end of June 2022 which sets out key actions for delivery in
22/23 and addresses the next phase in transforming the services provided to meet housing
need. These activities are crucial to reduce the time spent in temporary accommodation,
improving the quality of temporary accommodation provided, continue to deliver Housing
First and improve the health and wellbeing of those most vulnerable households. The plan
also explains how Midlothian Council will address the next phase of its approach to
transforming the services provided to those in housing need by developing other initiatives
during 2022/23 and into 2023/24, with an emphasis on the prevention of homelessness,
tenancy sustainability and early intervention. 
There continues to be a significant demand placed on homeless and temporary
accommodation services. A potential key challenge will be an increase in homelessness as
the financial measures put in place to protect households during the Covid pandemic are
now withdrawn, alongside the recent increase in energy, food and fuel costs, requiring a
Page 67 of 100

Page 68

6
comprehensive preventative approach as set out in the Council’s Rapid Rehousing Transition
Plan. 
During Q2 the number of households assessed as homeless or potentially homeless was
118, which is a 13.5% increase from Q2 20/21. The number of cases provided with Advice &
Assistance in Q2 was 211. 69 clients were prevented from homeless by accessing advice and
assistance. We continue to promote this service to ensure early successful intervention
when possible. There were 4,596 active housing applicants placed on the Common Housing
Register at the end of this reporting period. Re-let time for permanent properties has
decreased to 36 days this quarter compared to 45 days for Q1. Temporary re-lets has
decreased to 25 days from 34 days in Q1. 
This quarter, Cabinet agreed to develop a new Youth Homeless and Prevention Support
Project as part of the Councils RRTP. The aim of this service is to prevent youth
homelessness by supporting young people to remain in their current accommodation, or
secure alternative accommodation as part of a planned move. Where this is not possible,
young people would be supported through their homeless journey and into permanent
accommodation. Support would also be available to Midlothian Council tenants at risk of
eviction due to rent arrears or other breaches of their tenancy agreement to prevent
recurring homelessness. This project is currently going through the tendering process and
we anticipate it will commence during Spring 2023. 
During Q2 we have worked closely with Social Work, Melville Housing Association and the
Ministry of Defence to support refugees through the respective Governments Resettlement
Schemes. This has included providing housing and advice and support to households and
assisting in sourcing housing options for families involved in the scheme. 
Capital programme 
As Scotland’s fastest growing local authority area, it is critical to delivery that investment in
community infrastructure, such as housing, the learning estate, economic investment and
green infrastructure, is in the right place at the right time. This will help our communities to
live well, live locally and prosper. 
How we invest in community infrastructure must also respond to changes in our working
and living patterns brought about by the COVID-19 pandemic. Communities need to be able
to readily access the services they require. Capital investment is also an opportunity to
support our local economy through job creation and skills enhancement, particularly in
relation to supporting a transition to a green economy as we invest in sustainable, highly
energy efficient buildings. 
As a growing Council, we have the opportunity to transform parts of Midlothian in a way
that reflects how we live now. We will invest in community infrastructure with a focus on
place-making, reducing inequalities, improving economic opportunities and improving
education and health and wellbeing outcomes. 
The Capital Investment Strategy brings together many strands of the Council’s activities to
build upon our past successes and drive forward innovation in a co-ordinated and
achievable manner for the benefit of Midlothian and its citizens. 
Page 68 of 100

Page 69

7
The Capital Investment Strategy sits centrally within the Council’s future planning activities
and in doing so has to reflect the demands of Council services to ensure positive outcomes
are achieved in the right place, at the right time for the maximum benefit to
Midlothian.  The extensive capital programme, totalling £0.8bn, delivers new schools, a
record investment in council housing, improved community infrastructure, investment in
the local transport network and innovative developments such as the new low carbon heat
network in Shawfair. 
To ensure Midlothian is ‘building back better’, this investment is also creating new jobs,
apprenticeship opportunities, opportunities for businesses and communities and families
hard-hit by the impact of COVID-19. These new opportunities help lead the way out of the
pandemic and towards a better future for Midlothian. 
The Education Learning Estate Strategy programme has been developed and is subject
to regular review meetings with Education and stakeholders to ensure effective
monitoring, reporting and delivery of improvement and expansion of the Education
estate including Early Years provision. This currently covers approximately 30 projects at
various stages of development. 
In relation to our ambitious affordable housing programme, in total there were 334 site
starts last year with 154 homes continuing construction into 22/23. In total, Midlothian
Council attracted over £15m of Scottish Government grant funding into its affordable
housing programme in 2021/22. 
Midlothian Council is overseeing a significant housing programme. This includes the
largest Passivhaus programme in Scotland, with 182 homes to be built to the exacting
Passivhaus standard, in line with Midlothian Council’s Net Zero Housing Design Guide.
This ensures exceptionally high levels of energy efficiency and low utility bills for our
residents. 
Growing Council
In addition to the financial sustainability challenge referenced earlier, other challenges for
Midlothian continue with our recovery out of the pandemic, the cost of living crisis, the
growing and ageing population and the increasing demand for services that this brings. 
Midlothian is projected to have the highest percentage change in population size of all
mainland council areas in Scotland. From 2018 to 2028, the population of Midlothian is
projected to increase from 91,340 to 103,945. This is an increase of 13.8%, which is in
contrast to a projected increase of 1.8% for Scotland as a whole, with a 40.9% increase in
older people over 75. In addition, Midlothian has 10 zones which falls into the most
deprived areas giving a local share of 8.7% living in the most deprived areas in Scotland. 
This growth creates the opportunity to meet the housing need with 25% of new homes
being built in the affordable housing bracket, in addition to the expansion in Council house
building. This construction will directly support employment and will see a steady increase
in the value of Council Tax income received over time. 
The approved Capital Strategy sets out the infrastructure required to meet those
demographic pressures and includes the financial contributions Midlothian will make to the
Edinburgh and South East Scotland City Region Deal. Encompassing five main themes the
Page 69 of 100

Page 70

8
City Region Deal will bring significant investment across the regions with total investment of
circa £1.3 billion across: 
• Research, Development and Innovation: £751 million 
• Integrated Regional Employability and Skills: £25 million 
• Transport: £156 million 
• Culture: £45 million 
• Housing: £313 million 
Through the Data Driven Innovation strand the Deal will leverage existing world-class
research institutes and commercialisation facilities in order that Easter Bush becomes a
global location of Agritech excellence. The Easter Bush project includes significant
investment in transport infrastructure along the A701/2 transport corridor. In addition, by
improving on-site infrastructure at Easter Bush and transport infrastructure, The University
of Edinburgh expects commercial partners will be able to co-locate at scale to commercialise
Agritech breakthroughs. 
Page 70 of 100

Page 71

9  Page 71 of 100

Page 72

Page 72 of 100

Page 73

Appendix 1
Page 73 of 100

Page 74

1,859
1,149 1,216
1,750
1,552
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of complaints
received
433
824
1256
183
394
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Total savings in street lighting
carbon emissions (Tonnes)
(cumulative)
60%
100% 100% 75% 100%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
% of building warrant
assessments processed within
10 days rather than nationally
adopted target of 20 days
Target (80%)
38.30%
40.70% 41.50%
35.60%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
% of waste used to generate
heat and electric (Energy
from Waste)
53,445
98,390
173,042
116,176 93,321
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of Free school meals
provided (Primary 1-5)
(quarterly)
1 1 1
0
2
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of environmental
awards e.g. Green flags
27
18
23
33
38
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of out of control dog
investigations conducted
96.40% 85.16%
34.30% 34.30% 34.30%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
% of Councils housing stock
meeting Scottish Housing
Quality Standard (SHQS)
criteria (Target 100%)
98.40% 98.40% 98.40% 98.40% 98.40%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
% of the Councils housing stock
meeting the 'Modern facilities &
services' Scottish Housing Quality
Standard criteria
Target (100%)
0.15%
0.34%
0.54%
0.12%
0.27%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
% of the footpath
network resurfaced
Annual Target (0.60%)
88.93%
87.70% 88.34%
85.96%
87.13%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
% of completed second
priority repairs within target
of 7 days
1,919
3,549
4,821
1,716
2,736
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of volunteer hours in
countryside sites (cumulative)
Trend DataA full review of quarterly performance data is available via Pentana (Browser login link - https://midlothian.pentanarpm.uk/login)
Place Q2 22/23 performance report
Page 74 of 100

Page 75

99.30%
93% 96% 94% 96.20%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Satisfaction % relating to key areas
in Building standards including
those on delivery, timeliness,
information, access and the quality
of customer service
Target (90%)
98.90% 98.90% 98.90% 98.90% 98.90%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
% of the Council's housing stock
meeting the 'Free from serious
disrepair' Scottish Housing Quality
Standard criteria
Target (100%)
91.71%
88.87%
93.92% 93.51%
91.60%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
% of completed first priority
repairs within target of 24hrs
Holistic
Modern
Sustainable
Preventative
Key highlights
Building Standards continues to provide a high level of customer satisfaction against an increasing demand by co-ordinating working arrangements with partners,
monitoring performance, identifying any dips, publishing information on this together with any remedial action, identifying customer needs and ensuring appropriate
resources are available to meet those needs.
Capital programme: The Capital Investment Strategy sits centrally within the Council’s future planning activities and in doing so has to reflect the demands of Council
services to ensure positive outcomes are achieved in the right place, at the right time for the maximum benefit to Midlothian. The extensive capital programme, totalling
£0.8bn, delivers new schools, a record investment in council housing, improved community infrastructure, investment in the local transport network and innovative
developments such as the new low carbon heat network in Shawfair.
In relation to our ambitiousaffordable housing programme, in total there were 334 site starts during 21/22 with 154 homescontinuing construction into 22/23. In total,
Midlothian Council attracted over £15m of Scottish Government grant funding into its affordable housing programme last year. This includes the largest Passivhaus
programme in Scotland, with 182 homes to be built to the exacting Passivhaus standard, in line with Midlothian Council’s Net Zero Housing Design Guide. This ensures
exceptionally high levels of energy efficiency and low utility bills for our residents. During Q2, 50 new build homes were handed over for our tenants, providing vital
turnover over of older properties and allows movement across our waiting list to applicants. The newly conversion of Jarnac Court fully opened this quarter providing 22
rooms for temporary accommodation. The Education Learning Estate Strategy programme continues to progress this quarter and currently covers approximately 30
projects at various stages of development.
Areas of improvement: Due to changes in the Energy Efficiency regulations affecting the Scottish Housing Quality Standards (SHQS) criteria, 431 houses have been identified as
failing the Energy Efficiency Standard for Social Housing (ESSH). We have reduced these failures to 160 to meet the 2025 targets. However, with the Electrical Installation Condition
Reports (EICR’s) now part of the SHQS from the 31st March 2022 we have found that 4733 fail assessment and have 34.3% meeting standard. It should be noted that 100% of
smoke alarms comply with current legislation. Contracts are in process to address the EICRs and 160 properties for EESSH failure.
Building Services
Continue to deliver the Building Standards continuous improvement plan which forms part of the nationally adopted performance
framework and is submitted to the Scottish Government.
Continue to deliver the additional programmes of work identified by the house condition surveys to maintain Scottish Housing
Quality Standard for the Councils housing stock.
Deliver the Energy Efficiency Standard for Social Housing (EESSH) programme.
Continue to improve the delivery of Building Maintenance services through the review of mobile working, process improvements,
income and productivity.
Implementation of the Local Authority Carbon Management Plan and General Services Capital programme.
Page 75 of 100

Page 76

12,430
29,380
36,725
24,860
12,430
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Total hours used for cleaning
in primary schools
7,180
16,972
21,216
14,388
7,180
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Total hours used for cleaning
in secondary schools
6,294
14,877
18,596
12,588
6,294
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Total hours used for
Janitorial services in schools
Property and Facilities
Management
Key highlights
Energy: Work continues with Midlothian Energy to develop business case options for addressing building fabric and energy decarbonisation of the existing estate. Good progress
has been made with City of Edinburgh Council to secure the site for the new Midlothian Energy Centre at Millerhill, as a key step in the delivery of District Heating at Shawfair. 
Harden Green Economic Development Acquisition
Whilst work is progressing to develop proposals for the Hopefield Economic Development site in conjunction with the Development, the estates team have been successful in
acquiring a mixed Industrial and office development adjacent to the Council’s existing Hardengreen Industrial Estate. This represents a further expansion and diversification in
the style and size of units the Council will be able to make available to support growing Midlothian enterprises.
Asset Valuation: Asset Valuation was completed last quarter, confirmation of the valuation approval is with audit.
Investment: The sale of Nivens Knowe road site in Loanhead to Landsdown has resulted in securing a capital receipt in excess of £600,000. 
Janitorial, Cleaning & Catering: A total of 148,749 schools meals were provided during quarter 2 for nursery, primary and secondary schools. Cleaning Services continue to
provide enhanced cleaning, fogging, touchpoint cleaning and additional Janitorial support across all Council Buildings. 
Areas for improvement: Negotiations on behalf of Shawfair LLP for the acquisition of a new Shawfair All Through Schools Campus site from Network Rail are ongoing. This is a
complex negotiation involving multiple parties and although linked, have separate agreements.
International instability are impacting on energy prices and Midlothian current reliance on Carbon based fuel and lack of historical investment in alternative energy sources
makes us potentially vulnerable increasing and fluctuation prices. Current framework contract agreements are currently protecting the Council from significant increases. We
continue to monitor usage but this will be an ongoing challenge for the foreseeable future, with the need to also invest in fabric improvements and Net Zero also presenting a
corresponding technical, financial and resource challenge.
Asset based
Modern
Hub and Spoke
Preventative
Develop carbon reduction targets for Council properties and support of sustainable low carbon energy targets and district heating
schemes.
Support the delivery of the Economic Renewal Strategy through the letting and sale of Property Investment Account properties.
Lead the acquisition and disposal of identified sites in Capital and Local Plans, Learning Estate and Housing programmes and the climate
change agenda.
Continue to deliver Building Rationalisation and hybrid working.
Maintain compliance and review Health and Nutrition of school meals in accordance with new Scottish Government legislation. 
Increase revenue throughput the commercial sector of catering services.
Continue to provide a catering and facilities service that reacts to, and meets the requirements of the Early Years expansion programme.
Page 76 of 100

Page 77

4,523
4,596
Q1 22/23 Q2 22/23
Total applicants on housing
waiting lists (General needs
and Homeless)
100
122
Q1 22/23 Q2 22/23
Total number of housing lets
Housing
Key highlights
Midlothian Council’s updated Rapid Rehousing Transition Plan (RRTP) was submitted to the Scottish Government at the end of June 2022 which sets out key actions for delivery in 22/23 and
addresses the next phase in transforming the services provided to meet housing need. These activities are crucial to reduce the time spent in temporary accommodation, improving the
quality of temporary accommodation provided, continue to deliver Housing First and improve the health and wellbeing of those most vulnerable households. The plan also explains how
Midlothian Council will address the next phase of its approach to transforming the services provided to those in housing need by developing other initiatives during 2022/23 and into
2023/24, with an emphasis on the prevention of homelessness, tenancy sustainability and early intervention.
This quarter, Cabinet agreed to develop a new Youth Homeless and Prevention Support Project as part of the Councils RRTP. The aim of this service is to prevent youth homelessness by
supporting young people to remain in their current accommodation, or secure alternative accommodation as part of a planned move. Where this is not possible, young people would be
supported through their homeless journey and into permanent accommodation. Support would also be available to Midlothian Council tenants at risk of eviction due to rent arrears or other
breaches of their tenancy agreement to prevent recurring homelessness. This project is currently going through the tendering process and we anticipate it will commence during Spring
2023.
During Q2 the number of households assessed as homeless or potentially homeless was 118, which is a 13.5% increase from Q2 20/21. The number of cases provided with Advice &
Assistance in Q2 was 211. 69 clients were prevented from homeless by accessing advice and assistance. We continue to promote this service to ensure early successful intervention when
possible.
Re-let time for permanent properties has decreased to 36 days this quarter compared to 45 days for Q1. Temporary re-lets has decreased to 25 days from 34 days in Q1.
During Q2 we have worked closely with Social Work, Melville Housing Association and the Ministry of Defence to support refugees through the respective Governments Resettlement
Schemes. This has included providing housing and advice and support to households and assisting in sourcing housing options for families involved in the scheme.
Areas for improvement: There continues to be a significant demand placed on homeless and temporary accommodation services. A potential key challenge will be an increase in
homelessness as the financial measures put in place to protect households during the Covid pandemic are now withdrawn, alongside the recent increase in energy, food and fuel costs,
requiring a comprehensive preventative approach as set out in the Council’s Rapid Rehousing Transition Plan.
Holistic
Modern
Hub and Spoke
One size fits one
Increase the number of homeless households that obtain permanent accommodation, and half the average time taken to complete
homeless duty from 105 weeks to 52 weeks.
Implement Midlothian Council’s Allocation Policy.
Implement the approach to housing those with complex needs through a ‘Housing First’ model.
Review void management to minimise re-let timescales and further development of our tenancy support to improve the sustainability
of tenancies.
Introduce a new strategy to reduce drug deaths within Midlothian homelessness accommodation.
121 weeks wait time until homeless applicants receive a permanent housing
option. This is an increase from Q1 (106 weeks). Focus continues to target long
term cases where permanent housing options are more challenging due to
specific housing needs To note: The Council’s Rapid Rehousing Transition Plan set a target of
86weeks was length of time homeless applicants spent in Temporary
accommodation. Lets to legacy homeless applicants resulting in increased time
spent in temporary accommodation.
Page 77 of 100

Page 78

57
411
702
0 0
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of lighting columns
replaced (cumulative)
22/23 Annual Target (537)
51.1%
48.40%
45.10%
47.50%
52.10%
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
% of total household waste
that is recycled (Tonnes)
Target (54%)
0.47%
0.93%
2.05%
0.34%
1.38%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
% of total road network
resurfaced (cumulative)
Annual Target (2.2%)
Neighbourhood Services 
Key highlights 
The annual Capital Works Programme for carriageway resurfacing continues to make good progress this quarter with 9.43km of carriageway resurfaced over Q1 and Q2
(1.38% of the total road network). Our initial annual target of resurfacing 1% of the total road network has been achieved and a new revised target of 2.2% has been set for
the remainder of the year. In addition 1.88km of footways were resurfaced to the end of this quarter (0.27%), bringing this indicator back on target. 
Work is progressing to offer a reuse cabin at Stobhill Recycling Centre for the collection of household bric-a-brac for “play through learning”. The reuse cabin is expected to
reopen in Q3. 
A further 319 customers have signed up to the chargeable garden waste collection service this quarter. The service has a total of 18,563 customers and 19,639 bins. 
With support from our volunteers at both locations, Vogrie Country Park and Loanhead Memorial park received green flag awards this quarter. Land Services continue to
progress projects across Midlothian including a new play area in Waterfall Park, community garden in Penicuik, Burnbrae Primary School play area, Danderhall Pavilion play
area and new equipment installations as part of Scottish Government’s capital spend on play improvements. New path works at Straiton pond were completed this quarter. 
Overall grounds maintenance standards have been good this year. The dry weather in Q2 reduced grass cutting requirements. Working towards Midlothian’s aim to be
Carbon Neutral by 2030, Land Services have purchased additional battery powered small plant and machinery and a large charging unit which records and reports on carbon
savings made. In Q2 the operation of Pellenc battery operated equipment resulted in a 334.8kg reduction in Co2 emissions and also provided an equivalent saving of
£223.00 in fuel costs.
Areas for improvement: Domestic residual waste collection tonnages remain high, which is a continued trend from the COVID-19 pandemic effects. Although recycling rates
are estimated to have increased over Q1 and Q2 quarter, non-target materials placed by customers in blue bins continue to incur additional separation/disposal costs for
the Waste Services. 
Discussions continue to take place with Zero Waste Scotland regarding the implications of the introduction of the Deposit Return Scheme in August 2023, and the
introduction of Extended Producer Responsibility regulations. 
Holistic
Sustainable
Preventative  
One size fits one
93% of all street lights completed
within 7 days 
. 
8.2% of Council fleet which is
‘Green’ 
. 
Transform service delivery through the adoption of digital and mobile platforms. 
Improve and expand active travel and public transport for Midlothian residents. 
Continue to progress actions to reach the Scottish Government targets to recycle 70% of all waste. 
Develop a comprehensive asset database management plan for all Neighbourhood Services assets.  
Continue to invest in the workplace across all Neighbourhood Services teams to develop sustainable career pathways and generic working
model to grow talent and foster leadership opportunities. 
Page 78 of 100

Page 79

28 31
38
22
5
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of  new Business
start ups (LGBF)
79% 79% 80% 66% 80%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Determine 80% of planning
applications within target (2
months for a local application and
4 months for a major application).
Target (80%)
Planning and Economy 
Key highlights
The Business Gateway service continues to be digitally delivered. Advisers have attended local networking events with partners to increase service reach. The use of the Gateway CRM has
improved the quality of reporting and data available to Midlothian Council on business trends. The Social Enterprise development events have continued to stimulate interest in social
enterprise as a business structure. This quarter, Business Gateway has supported 14 clients that were unaware of the model but did have social or environmental aims, and this includes 2
enterprises that are “spin offs” from Local Authority teams. One of the local social enterprises was visited by Louise Macdonald, National Director for Economy, for the Scottish Government.
Plans are in place for the virtual delivery of community enterprise sessions across Midlothian in 2022/23 contributing to Community Wealth Building objectives.   
This quarter saw the introduction of a procurement mentor service to the client journey providing 1-2-1 support in public sector tendering, with the aim to increase the volume and quality
of local bids.  Clients are being referred via the Business Gateway Advisers and already feedback is showing interest in this service. Business Gateway will continue to promote to clients and
work to develop the mentoring offering, as well as work closely with the procurement team to implement the local procurement strategy.
We have continued to maximise opportunities to support recovery of the tourism sector by supporting the development of the tourism forum’s digital presence and representation on the
steering group. A £10,000 grant to the Midlothian Tourism Forum will allow the forum to design and build a website to increase membership and interest. The new Economic Strategy
planned for 2023 approval will include Tourism, Culture and Heritage.   
At its meeting in August 2022 the Planning Committee considered a report that highlighted that the Council has secured £9.5m and also received £12.1m in developer contributions towards
infrastructure and local facilities for the period 2021/22. Planning permission has been granted for the erection of 100 dwelling houses and associated works on the ‘Doctor’s Field’, Rosewell
and planning permission has been granted for 430 dwelling houses at land at Cauldcoats, Danderhall. 
Areas for improvement: The number of new business start ups has dropped for the quarter. Concerns around EU exit, post COVID trading conditions is a probable cause. There is an
atmosphere of uncertainty, which results in less investment in people or capital and a resulting decrease in growth. The increase in costs of doing business, especially fuel, raw materials,
import duties and availability has had a big effect on trading and will continue to affect growth. However, there is a strong pipeline of “pre-start” businesses engaging with the Business
Gateway service with a resulting spike in starts for the next quarter expected. 
Sustainable
Preventative
Holistic   
Hub and Spoke
Achieve the aims set out in the Planning Performance Framework (PPF)
Continue to embed the Climate Change Strategy and deliver against the action plan. 
Implement year 3 of a 5 year Penicuik Heritage project which delivers public realm improvements and investment in heritage assets in the town
centre 
Draft and adopt supplementary guidance on the ‘Quality of Place’ which will be used as a tool to enhance place-making within Midlothian 
Draft and adopt supplementary guidance on ‘Developer Contributions’ which will be used as a tool to secure financial contributions towards
infrastructure to meet the demands arising from new development 
Implement the statutory requirements of the new Planning Act 2019 which places additional burdens onto the Planning Service
Deliver on the objectives identified in the Strategy for Growth 2020-25 
Maintain and grow the client reach of Business Gate way services in Midlothian and continue to develop locate in Midlothian 
Locate in Midlothian website visits: 4,075 website
visits in Q2.
1,828 ‘Business Gateway Midlothian’ followers and 1,695
‘Locate in Midlothian’ followers across Facebook, Twitter and
Linkedin.   
Page 79 of 100

Page 80

22
70
122
37 42
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Number of primary
inspections conducted
(quarterly)
79.50%
81.80%
77.90%
81.10%
86.30%
Q2
21/22
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
% of consumer complaints
completed within 14 days
Protective Services
Key highlights
As part of the Environmental Crime Strategy a procedure to deal with abandoned vehicles has been developed and implemented. Within Q2, 54 requests for service have
been received.
A Short Terms Lets Licensing Scheme policy has been developed and consulted on. The online application system is now available to accept applications.
As a result of active involvement or advice by the Trading Standards Service, refunds of at least £10,160 were made to consumers this quarter making a total this year of at
least £22,660.
A total of 66 Trading Standards consumer complaints were received this quarter with 61 completed and 57 completed within 14 days. Completion is not fully within service
control as complainants and traders can be slow to respond to enquiries. Trading Standards seek to contact consumers and traders as early as possible to maximise time. In
addition to consumer complaints, the service were proactive in accepting and completing 16 Notifications from Advice Direct Scotland. 
42 primary inspections were carried out this quarter.  The number of inspections annually is dependent on the number of business premises risk assessed for inspection.
Some fluidity is required in that existing premises cease trading and new premises open and may require inspection. Also, new businesses found can also be inspected.
Areas of improvement: 73% of public health requests were responded to this year, which is similar to that responded to in Q1 21/22.  In the previous year the service was
impacted by the diversion of Environmental Health resources to proactively deal with the COVID pandemic. This figure reflects those cases where response has been
recorded in the Data Management System. EH service is further impacted by a number of staff vacancies.
Holistic
Preventative
Hub and Spoke
One size fits one
16%of dog control investigations required statutory enforcement
action this quarter.
73% of all Public Health service requests responded to this quarter.
Continue to deliver the Council’s regulatory functions with respect to food hygiene and standards regulations
Regulate Health and Safety across Midlothian through the investigation of workplace accidents
Restart a programme of test purchase for under-age goods
Implement a robust business continuity management system and business continuity approach
Continue to identify and respond to incidents of rogue trading
Page 80 of 100

Page 81

1
Progress Against Strategic Outcomes
Individuals and communities in Midlothian will be able to lead healthier, safer, greener and successful lives by 2030. 
No child or household need live in poverty. Midlothian will be a Great Green Place to Grow by achieving our net zero
carbon ambitions.
We are focussing on our new Single Midlothian Plan to reduce the impact of poverty on our most vulnerable.
Midlothian's Child Poverty report 2020 set out Midlothian's commitment to eradicating child poverty by 2030. 
The three drivers for achieving this are: 
• reduce the cost of living
• increase income from employment
• and increase income from social security and benefits in kind
We are also committed to improving health outcomes by working with partners to develop and maintain services
close to home that support the needs of local people
The Climate Emergency Group's values are to get to net zero equitably, taking into account different people and
communities’ capacities and abilities to get there.  Scotland's national target is to be Net Zero by 2045. Following the
motion to Council in 2019, in January 2020 the Community Planning Partnership (CPP) agreed to make meeting the
Climate Emergency target of 'Reducing Midlothian Carbon emissions to net zero by 2030' a priority in its shared
partnership work. 
Whilst a full update for the performance for each of the Council’s Service areas is published separately, this report
reflects an overview of the key service updates, against the thematic areas of the Single Midlothian Plan.
Going forward from 1st July 2022 for the next five year the Community Planning Partnership have identified our
outcomes which are:
• Individuals and communities have improved health and learning outcomes
• No child or household living in poverty
• Significant progress is made towards net zero carbon emissions by 2030
Single Midlothian Plan Themes in 2022/23
Adult, Health and Care - Achievements
Responding to growing demand for adult social care and health services
Our Vision: People in Midlothian are enabled to lead longer and healthier lives.
Our Values: Right support, right time, right place.  
Midlothian Integration Joint Board plan and direct the services that are delivered by Midlothian Health and Social
Care Partnership (HSCP). The HSCP is a partnership between NHS Lothian and Midlothian Council and is
responsible for services that help Midlothian residents to live well and get support when they need it. This includes all
community health and social care services for adults in Midlothian and some hospital based services such as
Accident and Emergency. 
In order to meet the legal requirements of the Public Bodies (Joint Working) (Scotland) Act 2014, the HSCP was
required to develop, consult on, and publish a new 3 year Strategic Plan in 2022. The new Strategic Plan for 2022-25
was published in April 2022. 
Midlothian Council Report Quarter Two 2022/23
Cabinet
Tuesday 29 November 2022
Item 5.7
Page 81 of 100

Page 82

2
HSCP COVID-19 Response - The Health and Social Care Partnership, its partners and the communities it serves
continued to be impacted by the COVID 19 pandemic, although restrictions are now eased, Scotland has seen an
increase in the number of positive cases (1 in 45) compared to the last quarter (1 in 95). As we approach winter, our
strongest mitigation against covid remains our vaccination programme. The Midlothian Health and Social Care
Partnership Vaccination Plan has been presented at our Senior Management Team and is included in our Winter
plan. We continue to work with our partners to support staff where required and ensure our service delivery is not
impacted by deploying staff to cover absences where needed. As we progress into the next quarter and Winter, a
strong focus on workforce is included in the Winter Plan.
Learning Disabilities:  Extra Care Housing: As with many other areas, Midlothian faces many challenges in
addressing the housing and care needs of an ageing population with increasingly complex requirements. Extra Care
Housing is a model of accommodation and care that supports people to live in their own tenancy. 
Care Homes: Midlothian has 10 older people’s care homes, 2 of which are HSCP run with one being an intermediate
care facility. The remaining 8 are privately run either by private companies, charitable organisations or independent
care homes. Health Boards and local Health and Social Care Partnerships continue to carry responsibilities for the
clinical and professional oversight of the care provided to people resident in care homes in line with the Scottish
Government guidelines (May 2020). 
Older People:  Extra Care Housing: As with many other areas, Midlothian faces many challenges in addressing the
housing and care needs of an ageing population with increasingly complex requirements. Extra Care Housing is a
model of accommodation and care that supports people to live in their own tenancy. Work was progressed on 3 sites
to provide 106 ECH bungalows or flats.   
Moving into a new phase of Covid-19 the Care Home Support Team will continue to provide support in a more
planned, proactive way, working alongside Care Home Staff in an advisory role, whilst remaining responsive when
necessary. The focus will remain on care provision, applying principles of Quality Improvement, through project-
based work. 
Care at Home: Currently provided by the HSCP and external providers. Care at Home services continue to meet
community needs by allocating new packages of care weekly. Midlothian services continue to experience significant
ongoing recruitment pressures, which are reflected nationally, including recruitment of office-based staff. Despite this
pressure, Care at Home services worked hard to ensure packages of care continued to be delivered. New contracts
were awarded to external Care at Home providers in 2021 and work is ongoing to ensure contracts are implemented
effectively, including proactive monitoring and audit activity. A review of the HSCP Internal Home Care Service is
underway to identify a sustainable delivery model for future provision
Mental Health:  Primary care developments: There has a been a postponement from the Scottish Government
regarding the funding for the Mental Health and well-being Monies, National plans will not progress at this time,
awaiting update from Scottish Government 
Individual Placement Support has been impacted by Covid 19 and subsequently the current post holder has left the
post. This post has unfortunately taken 4 recruitment processes but the post has now been successfully recruited to.
The new member of staff will be commencing employment in October. 
There continues to be strong partnership working between Housing, Health and Social care and third sector
providing support and housing for individuals with complex needs, through the housing first model. 
Community Safety – Achievements
Ensuring Midlothian is a safe place to live, work and grow up in
Justice We have continued to liaise with key partners (Courts and other Local Authorities) regarding the uptake of
bail services which has been a nil return in orders being imposed at Court. Requests for assessments are being
processed through notification of bail opposed lists but clients are either not in agreement to the assessment or,
more often than not, the Court is proceeding without formally requesting it. From communication with other areas we
are aware that it is a similar picture nationally and we are feeding this back to colleagues in Scottish Government. 
The Justice Service have continued to manage the unpaid work hours. The term backlog was initially used in
reference to unpaid work hours during Covid when unpaid work delivery was suspended in line with national
restrictions and therefore for a period of time no hours were completed. The term backlog is somewhat misleading;
as soon as a court imposes a CPO with ‘Unpaid work or other activity’ requirement the hours are outstanding until
the client completes them. Midlothian have no orders in backlog and we were one of the first local authorities able to
re-instruct clients to attend groups as soon as easing of restrictions permitted it. We were in part able to manage this
due to a very motivated staff team and the work of the line managers in developing Covid risk assessments. 
Page 82 of 100

Page 83

3
The team work closely with partner agencies to ensure that we are able to meet the needs of service users in terms
of re-integration and rehabilitation but also serve the communities that have been most affected by crime. The
Unpaid Work team has continued to develop and implement training pathways for clients undertaking an Unpaid
Work Requirement. This starts with all clients completing SCQF award at level 4 in Health & Safety as part of their
standard induction onto the Order. Clients have opportunity to undertake further SCQF qualifications including: First
Aid, Advanced Health & Safety Training and Manual Handling. Working with the Community Lifelong Learning Team
a further pathway has been developed for clients to undertake a variety of training courses including; an Adult
Achievement Award, CSCS Card, Digital Skills, An Introduction to Wellbeing or to undertake work improving their
literacy and numeracy Skills. 
Substance Misuse:  Key services based in Number 11 in Dalkeith continued to provide services including outreach
treatment, injecting equipment provision [IEP], naloxone, and information/advice. Currently, there are challenges with
recruitment. However, the Midlothian Substance Use Service continues to support and treat those individuals who
are most at risk. This includes the provision of Buvidal [an injectable form of Buprenorphine].The caseload of the
SUS service in Q2 averaged around 340. As a proxy measure, this indicates that at any given point, 340 people were
provided treatment and support as a protective factor in minimising harm. Despite pressure on capacity due to
recruitment challenges and consistently high number of people being treated, the service was able to deliver rapid
access to new 6 new patients. Staff recruitment to employ 2 WTE Non-Medical Prescribers has been completed.
Other recruitment to new nursing and 3rd sector posts are underway. These posts augment service capacity to
deliver the Medication Assisted Treatment Standards. 
Getting it Right for Every Midlothian Child - Achievements
Improving outcomes for children, young people and their families
All children, young people, adults and communities in Midlothian are supported to be the best they can be.
This will be achieved through a nurturing, respectful and collaborative approach that promotes wellbeing,
equity, inclusion and lifelong learning. 
The Getting It Right for Every Child Board (GIRFEC) is one of the main drivers for the effective delivery of services to
children. The GIRFEC Plan also known as the Integrated Children’s Service Plan 2020-2023, is a statutory 3 year
plan devised by the local authority and health.  The plan develops key outcomes and priority actions which are
designed to improve the lives of children, young people and families. The GIRFEC outcomes for the final year of the
3 year plan for 2022-23 are: 
1. More children and young people are safe, healthy and resilient
2. More children and young people receive timely and effective mental health support when they need it
3. Inequalities in learning are reduced
4 key areas for improvement have been identified. 
Priority 1 - Attainment and Achievement 
Priority 2 -  Included, Engaged and Involved: Wellbeing and Equity
Priority 3 - Self-Improving Systems
Priority 4 - Lifelong Learning and Employability 
These key areas will be analysed and improvements will be evidenced throughout the year.
Improving Opportunities Midlothian - Achievements
Creating opportunities for all and reducing inequalities
Customer Services Strategy: The Customer Service Strategy defines the key drivers that will enable Midlothian
Council to deliver ‘customer service excellence’ to our communities. It outlines the commitment to provide choice to
the customer in the way services are accessed and provided. This includes innovation, partnership working and
optimising the use of technology within resource constraints. The strategy will help us to change the way we deliver
services utilising the latest technologies and linking to national frameworks. 
As one of the fastest growing areas in Scotland, the Council cannot support more customers using the current
resources, systems and processes. This means that the adoption of digital and automated processes will be key to
continuing to provide a seamless customer journey, satisfying enquiries at the first point of contact and meeting
increased demand. 
Customer self-service and new automated processes can help deliver some key services without customers dealing
directly with a member of staff and could truly transform the way the Council deliver services. Increasing the pace of
digital transformation, particularly in front-facing customer services, will be a service and corporate priority, for
Midlothian Council – one that can deliver the required efficiencies without negatively affecting customer experience
Page 83 of 100

Page 84

4
Sport and Leisure:  Gorebridge Leisure Centre: The main hall remedial work is now complete. The works were
delayed due to the ongoing roof replacement programme but the centre will now be able to accommodate a fuller
programme. The centre is being utilised for the winter vaccination programme, on a smaller scale than previously
with only the lesser hall being used. 
Stabilisation in the global supply of chlorine products for swimming pools has meant that all spa pools previously
closed due to low availability of chlorine have now reopened. Swimming pool closures due to lack of chlorine were
avoided during Q2 which previously had looked very likely. 
Sustainable Growth - Achievements
Growing the local economy by supporting business growth and responding to growing demand for housing in a
sustainable environment
“Place is where people, location and resources combine to create a sense of identity and purpose. The Place
service ambition is to deliver joined-up, collaborative, and participative approaches to services, land and
buildings, across all sectors within a place, enabling better outcomes for everyone and increased
opportunities for people and communities to shape their own lives.”
Over recent years, innovative ways of working have been introduced and services adapted at pace to respond to the
needs of our citizens, in particular those experiencing the greatest levels of poverty and inequality. This has resulted
in a complete transformation of how the Council works. Our services are continuing to build on this learning moving
forward, harnessing the energy, flexibility and creativity demonstrated by our workforce, to embed a culture of
continuous improvement and innovation 
Hub and Spoke, one of Midlothian’s key drivers for change, will see a Locality approach to service delivery adopted,
developed in conjunction with community planning partners. The opportunity to review and redesign services that the
pandemic has provided will result in a more efficient and effective operation of sites within local communities. This
will improve service delivery, and ensure better outcomes for local communities. The continued rollout of enhanced
ICT capabilities will strengthen cross service working, produce resource efficiencies and support the localisation of
services.
Environmental Midlothian Council was one of the first local authorities to sign Scotland’s Climate Change
Declaration, publicly acknowledging the challenges and opportunities that climate change brings with a commitment
to make the Council’s activities net zero carbon by 2030. Work continues to implement the Council’s Climate Change
Strategy and focus continues within Place services to achieve future emissions targets. The ambitious strategy sets
out how we will reduce our greenhouse gas emissions, encourage and work with others in our community to mitigate
and adapt to changing climate. The strategy incorporates an action plan with a number of initiatives and ongoing
programmes which together are helping to reduce our emissions and carbon footprint. The annual progress report on
Climate Change was presented to Cabinet at its meeting of 18 October 2022. 
Economic and Regeneration Midlothian Council’s Economic Renewal Strategy sets out our ambitious approach to
managing the transition from lockdown and planning for the longer term challenges the local economy will face. The
strategy aims to mitigate the adverse economic impact on the local economy from COVID-19. Key aims are to
protect jobs and aid business recovery using a place based partnership approach that maximises the opportunities
developing from the pandemic. Taking this partnership approach, the strategy will foster entrepreneurship, upskilling
and training, addressing gaps in the market and changing the way business is done to better align this to customer
behaviour. Alongside support for agriculture, tourism and the leisure and hospitality sectors, the council will also
promote local jobs and self-employment opportunities, particularly for young people, to give them the necessary skills
and support they need to benefit from economic recovery. A report on EU-Exit impacts and the economy was
presented to Council in October which will inform the refresh of the Economic Strategy to be presented for approval
to Council in early 2023. 
Procurement - The procurement function has a central role in supporting the Council to achieve its strategic
priorities within a constrained financial envelope. Procurement allows the Council to repurpose its spending power to
drive our key strategic priorities and to secure the best possible value and outcomes for Midlothian. Effective
procurement can maximise the value of every pound spent in terms of jobs, skills and supply chain opportunities in
the local community. We will aim to address economic, social and environmental considerations at all stages of the
procurement cycle within the rules of open, fair and transparent competition. 
The Procurement team, in conjunction with Economic Development, have developed a Small and Medium Enterprise
(SME) Strategy to support and assist local businesses to win contracts fairly and transparently in a competitive
market. We will further develop our collaborative and commercial relationships with key partners as part of our
strategic category management approach, to deliver the best possible outcomes for the citizens of Midlothian. 
The team continues to utilise framework agreements with Scotland Excel and Procurement for Housing (amongst
others) which not only provides an easier route to market but also delivers value for money. The Procurement team
Page 84 of 100

Page 85

5
is currently working with Scotland Excel to review the service to ensure it remains fit for purpose. We have also
explored with neighbouring Councils albeit with limited success opportunities to collaborate on the joint delivery of
procurement services and so will continue to engage with Scotland Excel to support service development. 
Capital Strategy:  As Scotland’s fastest growing local authority area, it is critical to delivery that investment in
community infrastructure, such as housing, the learning estate, economic investment and green infrastructure, is in
the right place at the right time. This will help our communities to live well, live locally and prosper. 
How we invest in community infrastructure must also respond to changes in our working and living patterns brought
about by the COVID-19 pandemic. Communities need to be able to readily access the services they require. Capital
investment is also an opportunity to support our local economy through job creation and skills enhancement,
particularly in relation to supporting a transition to a green economy as we invest in sustainable, highly energy
efficient buildings. 
As a growing Council, we have the opportunity to transform parts of Midlothian in a way that reflects how we live
now. We will invest in community infrastructure with a focus on place-making, reducing inequalities, improving
economic opportunities and improving education and health and wellbeing outcomes. 
The Capital Investment Strategy brings together many strands of the Council’s activities to build upon our past
successes and drive forward innovation in a co-ordinated and achievable manner for the benefit of Midlothian and its
citizens. 
The Capital Investment Strategy sits centrally within the Council’s future planning activities and in doing so has to
reflect the demands of Council services to ensure positive outcomes are achieved in the right place, at the right time
for the maximum benefit to Midlothian. The extensive capital programme, totalling £0.8bn, delivers new schools, a
record investment in council housing, improved community infrastructure, investment in the local transport network
and innovative developments such as the new low carbon heat network in Shawfair. 
To ensure Midlothian is ‘building back better’, this investment is also creating new jobs, apprenticeship opportunities,
opportunities for businesses and communities and families hard-hit by the impact of COVID-19. These new
opportunities help lead the way out of the pandemic and towards a better future for Midlothian. 
The Education Learning Estate Strategy programme has been developed and is subject to regular review meetings
with Education and stakeholders to ensure effective monitoring, reporting and delivery of improvement and
expansion of the Education estate including Early Years provision. This currently covers approximately 30 projects at
various stages of development. 
In relation to our ambitious affordable housing programme, in total there were 334 site starts last year with 154
homes continuing construction into 22/23. In total, Midlothian Council attracted over £15m of Scottish Government
grant funding into its affordable housing programme in 2021/22. 
Midlothian Council is overseeing a significant housing programme. This includes the largest Passivhaus programme
in Scotland, with 182 homes to be built to the exacting Passivhaus standard, in line with Midlothian Council’s Net
Zero Housing Design Guide. This ensures exceptionally high levels of energy efficiency and low utility bills for our
residents. 
Digital Strategy and Digital Learning Strategy Supported by the appointment of SOCITIM Advisory (Society for
innovation, technology and modernisation) as a strategic partner and led by the Digital First Board, work progressed
to deliver an ambitious new digital strategy, Digital Midlothian 2021-2023, “Empowering People, Enabling Growth”.
Aimed at improving the way services are delivered to Midlothian citizens, the strategy sets out how local outcomes
will be improved by delivering digital services to digitally connected communities. 
Housing and homelessness Midlothian Council’s updated Rapid Rehousing Transition Plan (RRTP) was submitted
to the Scottish Government at the end of June 2022 which sets out key actions for delivery in 22/23 and addresses
the next phase in transforming the services provided to meet housing need. These activities are crucial to reduce the
time spent in temporary accommodation, improving the quality of temporary accommodation provided, continue to
deliver Housing First and improve the health and wellbeing of those most vulnerable households. The plan also
explains how Midlothian Council will address the next phase of its approach to transforming the services provided to
those in housing need by developing other initiatives during 2022/23 and into 2023/24, with an emphasis on the
prevention of homelessness, tenancy sustainability and early intervention. 
There continues to be a significant demand placed on homeless and temporary accommodation services. A potential
key challenge will be an increase in homelessness as the financial measures put in place to protect households
during the Covid pandemic are now withdrawn, alongside the recent increase in energy, food and fuel costs,
requiring a comprehensive preventative approach as set out in the Council’s Rapid Rehousing Transition Plan. 
Page 85 of 100

Page 86

6
During Q2 the number of households assessed as homeless or potentially homeless was 118, which is a 13.5%
increase from Q2 20/21. The number of cases provided with Advice & Assistance in Q2 was 205. We continue to
promote this service to ensure early successful intervention when possible. There were 4,564 active housing
applicants placed on the Common Housing Register at the end of this reporting period. 73 permanent homes have
been provided to housing list applicants via the common housing register during Q2. 13 to Waiting List applicants, 62
to Homeless applicants and 37 to Existing tenants. Re-let time for permanent properties has decreased to 36 days
this quarter compared to 45 days for Q1. Temporary re-lets has decreased to 25 days from 34 days in Q1. This
quarter, Cabinet agreed to develop a new Youth Homeless and Prevention Support Project as part of the Councils
RRTP. The aim of this service is to prevent youth homelessness by supporting young people to remain in their
current accommodation, or secure alternative accommodation as part of a planned move. Where this is not possible,
young people would be supported through their homeless journey and into permanent accommodation. Support
would also be available to Midlothian Council tenants at risk of eviction due to rent arrears or other breaches of their
tenancy agreement to prevent recurring homelessness. This project is currently going through the tendering process
and we anticipate it will commence during Spring 2023.  
During Q2 we have worked closely with Social Work, Melville Housing Association and the Ministry of Defence to
support refugees through the respective Governments Resettlement Schemes. This has included providing housing
and advice and support to households and assisting in sourcing housing options for families involved in the scheme
Challenges and Risks
The Financial Sustainability challenges for Midlothian continue with our recovery out of the pandemic, the cost of
living crisis, the growing and ageing population and the increasing demand for services that this brings. Midlothian is
projected to have the highest percentage change in population size of all council areas in Scotland. From 2018 to
2028, the population of Midlothian is projected to increase from 91,340 to 103,945. This is an increase of 13.8%,
which is in contrast to a projected increase of 1.8% for Scotland as a whole with a 40.9% increase in older people
over 75.  In addition, Midlothian has 10 zones which falls into the most deprived areas giving a local share of 8.7%
living in the most deprived areas in Scotland.
Financial Inflation as well as rising energy costs are affecting the construction industry in Scotland and the UK is
currently experiencing unprecedented adverse market conditions, leading to significant rises in tender prices for a
wide range of materials. There is evidence that inflation of between 10% and 15% beyond BCIS predictions is
affecting projects. Whilst measures such as value engineering are partially mitigating cost increase there is a risk that
the capital budgets will need to be increased with a resultant impact on the funding strategy. The situation continues
to be monitored however it is necessary to revisit existing capital plans and also review the 2022/23 service budgets
and implement savings measures in the year.
The current year’s budget, 2022/23, approved on 15 February 2022, was reliant on £12 million of one off funding
measures. As reported at Council in October 2022, on the assumption that funding flexibilities will offset any
unfunded costs associated with current pay offers and that there no further unfunded costs, the figure is now
projected to be £10.600 million. That is the extent to which the recurring expenditure in the current year’s budget is
financed by non-recurring funding sources.
As a consequence of the inflationary increase in costs and the cash flat grant settlements, the projected budget gap
for 2023/24 now stands at £11.084 million rising to a projected £23.154 million by 2027/28, albeit later years are
based on the existing service responsibilities with no adjustment for the consequences of the National Care Service
(Scotland) Bill. These budget gaps represent the extent to which recurring service expenditure is projected to exceed
recurring income for future years.
The Scottish Government’s Resource Spending Review (RSR), published on 31 May 2022, presented very
challenging financial planning parameters for Local Government. It indicated cash flat grant settlements through to
2025/26 with a £100m increase for 2026/27. Commentators on the RSR have recognised the impact on Local
Government, with both SPICe and the Fraser of Allander Institute stating that the proposals essentially represent a
7% real terms decrease in funding between 22/23 and 26/27. This is in contrast to the 4.7% real terms increase that
the Scottish Government will see overall (2% if social security transfers are excluded), and the real terms increases
that Health, Social Justice and Housing services will see. The real term decrease planned for Local Government
comes on top of significant real term reductions since 2013/14, which has driven ongoing reform, rationalisation,
innovation and transformation work across Local Government.
The Scottish Government’s National Care Services (Scotland) Bill, if enacted, would have fundamental implications
for the community and for Local Government itself. The wide reaching changes in the bill aim to deliver a National
Care Service by the end of the parliamentary term, which will impact on all aspects of the work of the Corporate
Solutions team, including financial implications, in both revenue and capital, our asset base, our workforce,
Page 86 of 100

Page 87

7
governance and legal arrangements and our digital infrastructure and platforms. It will require an immediate focus for
the foreseeable future and this will inevitably have implications for other priority work at a time of continued resource
constraint.
National Care Service:  The ‘Bill’ which is currently in Stage 1 of the process is currently being considered with an
expectation that the lead committee will provide a report on the Bill at the start of 2023.  CELCIS have been
commissioned to undertake research around the inclusion of children’s services within the NCS.  This work should be
concluded by August 2023.
The Health and Social Care Partnership, The Health and Social Care Partnership, its partners and the
communities it serves continued to be impacted by the COVID 19 pandemic. The Health and Social Care Partnership
has maintained delivery of services and continues to work with its partners to ensure resources are being managed
and deployed to cover staff absences where needed and continue to develop our remobilisation plans. We continue
to work to ensure key staff receive both the Covid and flu vaccine.
A growing and ageing population: Midlothian is the second smallest Local Authority in mainland Scotland but the
fastest growing. This will continue to pose challenges for health and social care services whilst also changing some
local communities. As people live for longer many more people will be living at home with frailty and/or dementia
and/or multiple health conditions. An increasing number of people live on their own, and for some this will bring a risk
of isolation.
Page 87 of 100

Page 88

8 Page 88 of 100

Page 89

1
Balanced Scorecard Indicators
Half Year Report 2022/23
This section of the Council report is presented using the Balanced Scorecard approach. The four
Balanced Scorecard perspectives and key areas of focus are shown in the following table and the
associated key indicators that follow are drawn from across the Councils services. 
Customer/Stakeholder Financial Health
• Improving outcomes for children, young
people and their families
• Ensuring Midlothian is a safe place to live,
work and grow up in
• Creating opportunities for all and reducing
inequalities
• Growing the local economy and supporting
businesses
• Responding to growing demand for
Housing and Adult Social Care services
• Maintaining financial sustainability and
maximising funding sources
• Making optimal use of available resources
• Reducing costs and eliminating waste
Internal Processes Learning and Growth
• Improving and aligning processes, services
and infrastructure
• Developing employee knowledge, skills and
abilities
• Improving engagement and collaboration
• Developing a high performing workforce
Each of the perspectives shown above are supported by a number of key measures and indicators which
ensure that the Balanced Scorecard informs ongoing performance reporting and helps to identify areas
for further improvement. The strategy map below provides an at a glance summary of the key
performance indicators identified for the Single Midlothian Plan and under each of the perspective
headings of the Balanced Scorecard. Detailed performance data is available in the quarterly service
performance reports.
Cabinet
Tuesday 29th November 2022
Item 5.8
Page 89 of 100

Page 90

2
Single Midlothian Plan - Key Indicators 
The Single Midlothian Plan is our shared plan of how we will meet the needs of our local communities
and bring together all the priorities for Midlothian into one place. It shows how the Public, Private and
Voluntary sectors and local communities will work together to make improvements in people’s lives, by
improving outcomes with individuals and communities, promoting preventative approaches that reduce
demand for public services, and working with communities to increase their influence in decision
making. 
Our outcomes for the next 5 years are: 
• Individuals and communities have improved health and learning outcomes 
• No child or household living in poverty 
• Significant progress is made towards net zero carbon emissions by 2030 
The Community Planning Partnership will identify a range of key indicators relating to the outcomes
and will be available in the Annual Balanced Scorecard Report 2022/23. 
Page 90 of 100

Page 91

3
Customer Perspective - Adult, Health and
Care 
1. Adult Health and Care 
Performance Indicator 2017/18 2018/19 2019/20 2020/21 2021/22 Q2 2022/23
Value Value Value Value Value Value Target Status
Number of individuals referred through
the Safe and Together approach.  
7 4 4 2 2 
Reduce the number of emergency
admissions for people aged 75+ (RIE &
WGH)
2,393 2,266 2,693 2,409  567 Data  only 
Total number of completed Adult Carer
Support plans (accumulative)  
665 1,623 2,010 401 Data  only 
Number of individuals accessing the
Midlothian Access Point
949 1,092 911 605 1,446 331 150 
Number of Health & Social Care staff
who have participated in face to face or
on-line training
1,741 1,595 979 1,171 1,021 199 Data  only 
Decrease the percentage of falls which
result in a hospital admission for clients
aged 65+
3.8% 7% 4.4% 3.77% 2.32% 3% 6% 
Maintain at zero the number of patients
delayed in hospital for more than 2
weeks at census date
16 20 1 4 10 10 0 
Percentage of people aged 65 and over
with long-term care needs receiving
personal care at home  (LGBF)
68.04% 50.4% 52.54% 53.6%  Annual Measure/ Data  only       
Page 91 of 100

Page 92

4
Customer Perspective - Community Safety 
2. Community Safety 
Performance Indicator 2017/18 2018/19 2019/20 2020/21 2021/22 Q2 2022/23
Value Value Value Value Value Value Target Status
% of satisfactory complete Community
Payback Orders
67% 68% 61.8% 78% 73.4% 86% 80% 
Percentage of all street light repairs
completed within 7 days (cumulative)
90.6% 100% 80.5% 94% 100% 93% 90% 
Page 92 of 100

Page 93

5
Customer Perspective - GIRFEC 
3. Getting it Right for Every Midlothian Child 
Performance Indicator 2017/18 2018/19 2019/20 2020/21 2021/22 Q2 2022/23
Value Value Value Value Value Value Target Status
Number of outcome focused
assessments undertaken (cumulative)
1,006 1,241 1,478 1,045 1,339 627 Data only 
Number of referrals to the duty service
(cumulative)
4,893 5,519 5,930 6,043 8,287 4,367 Data only 
Number of foster carers going through
prep groups on a quarterly basis
(cumulative)
53 23 28 27 24 8 Data only 
Number of new foster carers approved
(cumulative)
5 5 1 2 3 0 Data only 
Number of foster carers de-registered
quarterly (cumulative)
3 4 2 5 5 3 Data only 
Number of permanence LAAC 
Reviews happening quarterly
(cumulative)
16 37 29 23 10 6 Data only 
Number of children matched in quarter
– (average months from perm LAAC to
matching panel) (cumulative)
12 6 7 2 8 3 Data only 
Number of places taken at residential
houses - capacity 12
10 7 12 12 12 12 Data only 
The number of children living in kinship
care
66 53 70 61 61 62 Data only 
The number of children living in foster
care
86 63 68 65 65 62 Data only 
Number of Midlothian children on the
Child Protection Register
36 51 53 36 38 42 Data only 
Rate per 1,000 population of Midlothian
children on the Child Protection
Register in relation to the Scottish
average
2.2 3 3 2 2.1 2.3 Data only 
% of Child Protection plans which have
integrated chronology
94% 96% 99% 93% 79% 93% Data only 
Rate per 1,000 of Midlothian Looked
After Children AT HOME in comparison
with the Scottish average
3.7 4.2 3.1 1.6 1.5 1.5 Data only 
Page 93 of 100

Page 94

6
Performance Indicator 2017/18 2018/19 2019/20 2020/21 2021/22 Q2 2022/23
Value Value Value Value Value Value Target Status
Rate per 1,000 of Midlothian Looked
After and Accommodated Children in
comparison with the Scottish average
9.4 7 7.9 7.3 7 6.9 Data only 
The number of looked after children
and young people not in residential
placed outwith Midlothian
24 16 13 9 11 11 Data only 
The number of looked after children
and young people placed in Residential
School outwith Midlothian
8 6 4 3 2 2 Data only 
The number of young people who are
allocated/engage with Through Care
and After Care service
90 65 56 51 64 61 Data only 
Child Protection: % of Core Group
meetings held within a 8 week period.
100% 99% 98% 100% 98% 100% 100% 
Child Protection: % of Core Group
meetings held within 15 days for Initial
93% 87% 79% 89% 86% 87% 100% 
Improve Primary School attendance 94.5% 94.86% 94.04% 95.06% 92.25% 94.22% 95% 
Improve Secondary School Attendance 89.4% 89.34% 89.34% 90.97% 87.36% 89.15% 91.5% 
Reduce exclusions in Primary schools
(Rate per 1,000)
74 94 8.44 6.16 3.04 0.73 10 
Reduce exclusions in Secondary
schools (Rate per 1,000)
299 210 14.8 13.7 20.2 3.51 15 
Average primary school attendance 94.47% 94.86%  95.06% 92.25% 94.22% 95% 
Average secondary school attendance 89.39% 89.34%  90.97% 87.36% 89.15% 91.5% 
Number of Children looked after away
from home
181   150 140 143 Data only 
SEEMiS Exclusion data - Primary (2%
reduction) - Rate per 1,000 
16.1 8.4  3.04 Annual
Data
15 
SEEMiS Exclusion data - Secondary
(2% reduction) - Rate per 1,000 
52.9 14.8  20.2 40 
Percentage of Midlothian Care
Experienced school leavers
progressing to positive destinations
72.73% 62.5% 92.31% 80.95%  Data not available 
Annual percentage seen within 18
weeks for first treatment
48.8% 52.2% 74.5% 48% 56.8% Off Target   
Page 94 of 100

Page 95

7
Customer Perspective - Improving
Opportunities for Midlothian 
4. Improving Opportunities for Midlothian 
Performance Indicator 2017/18 2018/19 2019/20 2020/21 2021/22 Q2 2022/23
Value Value Value Value Value Value Target Status
Midlothian Citizen Advice Bureaux
(CABs) will generate an income
maximization of £625k per quarter
£3,704,16
1
£3,352,38
0
£4,401,85
0
£3,055,70
3
£5,703,70
4
Annual measure – latest data for
21/22 was on Target       
% of those leaving school secure a
positive destination
94.35% 93.81% 94.47% 95.44%    
Number of Midlothian Active Choices
(MAC) attendees during quarter
(quarterly)
9,263 11,433 1,997  1,287 1,018  
Number of activities offered by Ageing
Well to 50+ age groups (quarterly)
23 15 15 19 45 53 15 
Tone zone retention rate (quarterly) 49.25% 53.5% 55% 52% 74% 62% 55% 
Proportion of Pupils Entering Positive
Destinations  (LGBF)
94.91% 93.81% 94.47% 95.44%  Annual Measure –
Latest figure for 20/21 was on
Target                             
Amount of household income gained by
the Welfare Rights Team
(accumulative)
£3,408,15
1
£4,407,37
3
£4,411,10
5
£4,226,84
8
£4,320,09
0
£4,320,09
0
£1,500,
000    
Percentage of Unemployed People
Assisted into work from Council (LGBF)
6.71% 25.47% 14.25% 12.94%  Annual Measure – Data only                                           
Page 95 of 100

Page 96

8
Customer Perspective - Sustainable Growth
and Housing 
5. Sustainable Growth 
Performance Indicator 2017/18 2018/19 2019/20 2020/21 2021/22 Q2 2022/23
Value Value Value Value Value Value Target Status
Number of environmental awards e.g.
Green flags
5 2 2 1 1 2 2 
Percentage of Council fleet which is
'Green' (cumulative)
5.41% 5.34% 8.2% 8.4% 8.2% 8.2% 8% 
Percentage of waste going to landfill
per calendar year (quarterly)
40.9% 24.6% 11.5% 11.5% 12.3% N/A 15.0% 
Re-let time permanent accommodation
properties (calendar days)
50 days 49 days 54 days 46 days 46 days 36 days 35 days 
Percentage of the Council's housing
stock meeting the 'Modern facilities &
services' Scottish Housing Quality
Standard criteria
100% 100% 98.4% 98.4% 98.4% 98.4% 100% 
Number of New Business Start Ups
(LGBF)
202 153 149 N/A 122 5 Data only 
Street Cleanliness Score  (LGBF) 95.98% 91.3% 93.91% 85.45%  Annual Measure latest data for
20/21 showed Off Target
Percentage of total household waste
that is recycled  (LGBF)
51.6% 58.2% 50.8% 47.3% 47.5% N/A 54.0% 
Corporate Indicator - Percentage of the
Councils housing stock meeting the
Scottish Housing Quality Standard
criteria   (LGBF)
96.05% 96.13% 94.3% 98.12% 34.3% 34.3% 100% 
% of total road network resurfaced
(cumulative)
1.3% 1.67% 0.85% 0.54% 2.05% 1.38% 1% 
Page 96 of 100

Page 97

9
Financial Health Perspective 
Short Name 2017/18 2018/19 2019/20 2020/21 2021/22 Q2 2022/23
Value Value Value Value Value Value Target Status
Performance against revenue budget £202.932
m
£203.596
m
£206.362
m
£226.262
m
£240.921
m
Latest data for Q1
22/23 showed Of
Target 
Corporate Indicator - Primary Education -
Cost per pupil  (LGBF)
£5,702.0
8
£5,963.3
9
£5,847.8
2
£5,848.9
2
Annual Measure
Corporate Indicator - Secondary Education -
Cost per pupil (LGBF)
£7,730.1
3
£7,590.0
4
£7,520.1
6
£7,744.0
6
Annual Measure
Corporate Indicator - Pre- Primary
Education - Cost per pupil (LGBF)
£4,783.5
9
£5,211.8
3
£7,641.1
4
£9,981.4
4
Annual Measure
Corporate Indicator - The Gross Cost of
"Children Looked After" in Residential
Based Services per Child per Week  (LGBF)
£4,159.7
1
£3,928.0
3
£4,318.5
9
£6,714.5
0
Annual Measure
Corporate Indicator - The Gross Cost of
"Children Looked After" in a Community
Setting per Child per Week  (LGBF)
£378.31 £358.80 £366.50 £485.61  Annual Measure
Corporate Indicator - Central Support
services as a % of Total Gross expenditure
(LGBF)
4.45% 4.27% 4.09% 3.8%  Annual Measure
Corporate Indicator - Cost of collecting
council tax per dwelling (LGBF)
£10.30 £7.89 £6.50 £6.13 £8.54 Annual Measure
Corporate Indicator - Percentage of invoices
sampled and paid within 30 days (LGBF)
93.1% 91.1% 89.6% 92.3% 93.1% 93.3% 95.0% 
Corporate Indicator - Net cost of waste
collection per premise (annual)   (LGBF)
£82.79 £74.54 £54.20 £69.33  Annual Measure
Corporate Indicator - Net cost of waste
disposal per premise (annual)   (LGBF)
£94.66 £94.39 £57.84 £34.02  Annual Measure
Corporate Indicator - Net cost of street
cleaning per 1,000 population   (LGBF)
£13,152.
15
£13,154.
33
£11,490.
64
£13,666.
13 
Annual Measure
Corporate Indicator - Cost of maintenance
per kilometre of roads  (LGBF)
£9,148.1
8
£12,759.
99
£8,984.4
9
£7,365.8
6
Annual Measure
Corporate Indicator - Cost of Trading
Standards, Money Advice & Citizen Advice
per 1000 population (LGBF)
£5,475.9
4
£5,261.7
3
£4,983.8
9
£6,194.3
1
Annual Measure
Corporate Indicator - Cost of environmental
health per 1,000 population.  (LGBF)
£12,595.
90
£9,255.8
6
£8,883.3
3
£8,749.3
3
Annual Measure
Corporate Indicator - Older Persons Home
Care Costs per Hour (Over 65)  (LGBF)
£41.06 £38.12 £20.82 £25.45  Annual Measure
Corporate Indicator - Self Directed Support
(Direct Payments + Managed Personalised
4.75% 4.49% 5.06% 4.31%  Annual Measure
Page 97 of 100

Page 98

10
Short Name 2017/18 2018/19 2019/20 2020/21 2021/22 Q2 2022/23
Value Value Value Value Value Value Target Status
Budgets) spend on adults 18+ as a % of
total social work spend on adults
18+ (LGBF)
Corporate Indicator - The Net Cost of
Residential Care Services per Older Adult
(+65) per Week (LGBF)
£462.20 £469.47 £483.83 £457.19  Annual Measure 
Page 98 of 100

Page 99

11
Learning and Growth Perspective 
Short Name 2017/18 2018/19 2019/20 2020/21 2021/22 Q2 2022/23
Value Value Value Value Value Value Target Status
Percentage of employees who are
performing as 'Outstanding' in their
individual performance framework
6.7% 6.31% 7.01% 9.67% 9.2% Annual
Measure 
Percentage of employees who are
performing as 'High' in their individual
performance framework
25.55% 26.79% 20.27% 24.18% 22.81% Annual
Measure 
Percentage of employees who are
performing as 'Good Overall' in their
individual performance framework
39.9% 47.68% 50.06% 54.18% 46.86% Annual
Measure 
Percentage of employees who are
performing as 'Below Standard' in their
individual performance framework with
appropriate improvement plans in place
0.59% 0.85% 0.25% 0.77% 0.25% Annual
Measure 
Percentage of staff turnover (including
teachers)
10.3% 10.38% 9.22% 5.9% 9.5% 3.6%  
Corporate Indicator - The Percentage of
council employees in top 5% of earners that
are women (LGBF)
49.0% 49.2% 51.0% 55.1% 55.0% 55.9% 50.0% 
Corporate Indicator - The gender pay gap
between average hourly rate of pay for male
and female - all council employees (LGBF)
2.32% 3.94% 3.06% 2.7% 2.52% 2.84%  
Corporate Indicator - Sickness Absence
Days per Employee (All employees)
7.5 8.55 9.7 7.26 9.33 4.81  
Corporate Indicator - Teachers Sickness
Absence Days (LGBF)
4.59
days
5.15
days
5.80
days
3.47
days
4.61
days
2.10
days  
Corporate Indicator - Local Government
Employees (except teachers) sickness
absence days (LGBF)
8.59
days
9.86
days
11.19
days
8.76
days
11.22
days
5.92
days   
Page 99 of 100

Page 100

12
Internal Processes Perspective 
Short Name 2017/18 2018/19 2019/20 2020/21 2021/22 Q2 2022/23
Value Value Value Value Value Value Target Status
Percentage of published LGBF indicators in
the top half of Scottish Council  
44.2%   Annual Measure       
% of internal/external audit actions
progressing on target.   
95.4% 91.67% 98.85% 85% 
% of high risks that have been reviewed in
the last quarter   
100% 100% 100% 100% 
Corporate Indicator - Percentage of adults
satisfied with libraries  (LGBF)
66% 69.07% 62.4% N/A  Annual Measure         
Corporate Indicator - Percentage of adults
satisfied with parks and open spaces 
(LGBF)
78.67% 84.67% 81.33% N/A  Annual Measure        
Corporate Indicator - Percentage of adults
satisfied with leisure facilities (LGBF)
74.33% 70.87% 63.2% N/A  Annual Measure       
Corporate Indicator - Percentage of Adults
satisfied with local schools (LGBF)
78.67% 74.63% 69.3% N/A  Annual Measure       
Corporate Indicator - Percentage of Adults
satisfied with refuse collection   (LGBF)
89.67% 87.1% 83.1% N/A N/A Annual Measure       
Corporate Indicator - Percentage of adults
satisfied with street cleaning   (LGBF)
71.33% 67.97% 62.3% N/A N/A Annual Measure       
Total number of complaints received
(quarterly)   
7,337 6,450 1,642  
Percentage of complaints at stage 1
complete within 5 working days  
87.61% 91.32% 87.7% 88.85%  
Percentage of complaints at stage 2
complete within 20 working days  
60.87% 78.57% 70.21% 87.5%   
Page 100 of 100