Page 1

Notice of Meeting and Agenda 
Audit Committee 
Venue:  Council Chambers/Hybrid, 
Midlothian House, Dalkeith, EH22 1DN 
Date:  Monday, 18 March 2024 
Time:  11:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone:
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk
Page 1 of 114

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item
and the nature of their interest. 
4          Minute of Previous Meeting
4.1 Minute of meeting of 29 January 2024 submitted for approval 3 - 10
4.2 Action log 11 - 12 
5          Public Reports
5.1 Annual Audit Plan 2023/24, report by Audit Scotland, External
Auditors
13 - 32
5.2 Internal Audit Work to February 2024, report by Chief Internal
Auditor
33 - 42
5.3 Counter Fraud Annual Plan 2024/25, report by Chief Internal
Auditor
43 - 48
5.4 Internal Audit Charter, report by Chief Internal Auditor 49 - 58
5.5 Internal Audit Strategy and Annual Plan 2024/25, report by Chief
Internal Auditor
59 - 74
5.6 Strategic Risk Profile Q3 2023/24, report by Chief Officer Place 75 - 114 
6          Private Reports 
No items for discussion 
7          Date of Next Meeting 
The next meeting will be held on Tuesday 14 May 2024 at 2.00pm. 
Page 2 of 114

Page 3

Minute of Meeting 
Audit Committee 
Date Time Venue
Monday 20 January 2024 11.00 am Council Chamber/Hybrid 
Present:
Councillor Milligan (Chair)
Councillor Bowen
Councillor McCall
Councillor McEwan
Councillor Smaill 
In Attendance:
Grace Vickers Chief Executive
Alan Turpie Legal and Governance Manager/Monitoring Officer
Kevin Anderson Executive Director Place
Fiona Robertson Executive Director Children, Young People & Partnerships
Morag Barrow Director Health and Social Care
Derek Oliver Chief Officer Place
David Gladwin Chief Financial Officer 
Duncan Stainbank  Chief Internal Auditor
Elaine Greaves Principal Internal Auditor
Gary Thomson Senior Finance Officer
Patricia Fraser Audit Scotland
Janet Ritchie Democratic Services Officer
Hannah Forbes  Democratic Services Assistant 
Audit Committee
Monday 18 March 2024
Item No 4.1 
Item 4.2
Page 3 of 114

Page 4

1. Welcome and Apologies for Absence 
The Chair welcomed everyone to the meeting and drew the committee’s
attention to the issue with the online papers which were reinstated on Friday
and if everyone agreed to accept all papers the meeting would proceed.
2. Order of Business 
The order of business was as detailed in the agenda previously circulated. 
3. Declarations of interest 
No declarations of interest were intimated at this stage of the proceedings. 
4. Minutes of Previous Meetings 
4.1 The minute of the meeting of 30 October was submitted for approval. 
Mr Gladwin highlighted a typo on page 6 which should read Section 95 Officer,
not Section 75 Officer. The minute was approved with this amendment. 
Councillor Smaill highlighted that during the discussion on the Newbattle site it
was noted that a paper would be presented to March Council then on to the
Audit Committee and Mr Anderson in confirming also confirmed that the policy
on new houses cost benefit would include passive housing in the analysis and
there is no additionality to the rent for passive house status but there is for the
new build supplement policy. 
4.2 The minute of the meeting of the Special meeting of 5 December 2023 was
submitted and approved as a correct record. 
4.3     The Action log was submitted and noted. 
Councillor Smaill highlighted that Hillend was not on the action log and due to
the issues should this be added.  Mr Anderson advised that the reporting
mechanism was in place and that the Internal Audit review report be reported
back to the Audit Committee. Mr Stainbank confirmed that the work on Hillend
will proceed shortly, and a report will be brought back to the June Audit
Committee. 
Councillor Smaill further raised the problems of the road and that it was
important to receive assurance that this project would get back on track.  Mr
Anderson provided an update on the two active contracts, one in relation to the
road issue and the other the Alpine Coaster and there is one other in respect of
tendering for the main building.  Mr Anderson further advised that there has
been a resolution in terms of the water pipes and the work will be undertaken
by the civil contractor on site and the revised programme will be reported to the
Hillend project board this week and this will in turn be reported to the Business
Transformation Steering Group. 
Page 4 of 114

Page 5

5 Public Reports 
Report No. Report Title Submitted by:
5.1 Annual Audit Report to Members and the
Controller of Audit - year ended 31 March
2023
Chief Financial Officer
and Section 95 Officer
Outline of report and summary of discussion
In accordance with the Treasury Management Code of Practice, the annual
Treasury Management & Investment Strategy (TMIS) & Prudential Indicators
report was required to be adequately scrutinised before being recommended to
the Council.  For Midlothian, this role was undertaken by the Audit Committee,
with this report being presented to Audit Committee on 29 January 2024 prior to
consideration by Council on 27 February 2024.
The purpose of the report to Council will be to provide an update on the
implementation of the Council’s TMIS 2023/24, and to make recommendations to
facilitate consideration of the 2024/25 Strategy, specifically the TMIS for 2024/25,
the Prudential and Treasury indicators contained therein, and the approach to the
statutory repayment of loans fund advances.
Any revisions arising from Audit Committee consideration of the report on 
29 January 2024 will be incorporated into the final version of the report to Council
on 27 February 2024.
Mr Gladwin in presenting this report advised that there were no material changes
from the existing strategy presented to Council in February 2023 and advised that
the only change asked of Members was to increase the authorised limit for
external debt to £545.673 million to reflect anticipated borrowing to the end of the
financial year 2024/25.  Mr Gladwin highlighted the main sections contained within
the report and outlined the recommendations as set out in the report.
Councillor Smaill raised the reconciliation of the steep increase on the borrowing
capacity and the impact on the general reserves and the impact on the ability to
have a balanced budget each year.  Mr Gladwin in responding confirmed the
importance of the capital plan in the context of the Medium-Term Financial
Strategy (MTFS).  Mr Gladwin then explained that discussions will take place with
elected members in the coming weeks as the 24/25 budget is prepared and he
will be restating MTFS projections through to 28/29 or possibly 29/30 including up
to date projected debt charges.  Further discussion took place with regards to the
increase in the debt limit, the overall long-term affordability, and the cost of
borrowing.
Councillor McEwan asked for clarity on the increase of the borrowing limit for
future years and Mr Gladwin confirmed that this is the maximum amount Officers
have authority to borrow as based on the capital plans in place. In previous years
TMIS the authorised borrowing limit has been set looking out for a number of
years. Whilst the Council strives to get to a long-term sustainable medium term
financial strategy it is considered prudent to limit the authorised limit to the
following financial year only. 
Page 5 of 114

Page 6

Decision
The Audit Committee endorsed the recommendations which are proposed to be
put to Council on 27 February 2024: 
a) Approve the restriction of the Authorised Limit to the value of the Capital
Financing Requirement at 31 March 2025 (£545.673 million), pending
finalisation of the General Services Capital Plan Prioritisation.
b) Note that there are no other material changes proposed to the Treasury
Management and Investment Strategy (TMIS) for 2024/25 from the
strategy currently in place, other than to update the Prudential Indicators
(Section 5 and Appendix 2), to reflect the revised capital plans.
c) Note the retention of the current approach for the repayment of loans
fund advances as outlined in Section 6 and that any changes arising from
the Scottish Government’s consultation on the Amendment to the Local
Authority (Capital Finance and Accounting) (Scotland) Regulations 2016
will be reflected in a revised TMIS if required; and
d) Accordingly approve the Treasury Management and Investment Strategy
for 2024/25.
Action
Chief Financial Officer and Section 95 Officer 
Report No. Report Title Submitted by:
5.2 Follow-Up Review of Completed Internal
Audit Recommendations 
Chief Internal Auditor 
Outline of report and summary of discussion
The purpose of this report was to provide an update to members of the Audit
Committee on the results of the Internal Audit Follow-up review which included a
sample check on the adequacy of new internal controls for Internal Audit
recommendations marked as completed by Management in the period April 2022
to March 2023. 
This report also provides an update to members of the Audit Committee on the
status of the implementation by Management of audit recommendations made
and agreed in Internal Audit reports. 
Mr Stainbank in presenting this report outlined that of the 41 recommendations
selected, 27 were fully completed, 8 were partly completed and required further
work and 6 were not implemented as detailed within the report.  
Decision
The Audit Committee: 
(a) Noted the results from the sample check of Internal Audit
recommendations that have been marked as completed by Management
in the period April 2022 to March 2023 to improve internal controls and
governance and mitigate risks.
Page 6 of 114

Page 7

(b) Acknowledged the progress made by Management in implementing
Internal Audit recommendations to improve internal controls and
governance, to mitigate risks, and consider whether it is satisfied with the
progress made by Management.
(c) Considered whether it is satisfied with the outcomes or whether any further
action is required.
(d) Endorsed the proposal to extend the due dates for the overdue
recommendations.
(e) Noted that Internal Audit will continue to monitor for completion the
outstanding recommendations and will provide update reports to the Audit
Committee. 
Report No. Report Title Submitted by:
5.3 Internal Audit Mid-Term Performance
Report 2023/24
Chief Internal Auditor
Outline of report and summary of discussion
The purpose of this report was to inform the Audit Committee of the progress
Internal Audit has made in the first 9 months of the year to 31 December 2023,
towards completing the Internal Audit Annual Plan 2023/24. It also summarises
the statutory obligations for Internal Audit and requirements of the Public Sector
Internal Audit Standards. 
Mr Stainbank in highlighting the main sections contained within the report
advised that the Internal Audit plan had, in addition to regularly required review
processes, 13 audits scheduled for completion in 2023/24 and that 2
assignments were substituted for other risk work which had been identified
during the year and is detailed on the appendix to the report.  Mr Stainbank
advised that these audits had been replaced by Property leases as detailed in
item 5.5 on today’s agenda and work which will be completed in relation to the
Hillend project. 
Mr Stainbank in responding to a comment raised by Councillor Smaill regarding
the fact the internal audit team was smaller, advised that the team had been
reduced by 1fte but the plan was appropriately sized for this but they were at risk
should a member of the team go off unwell it would then have to be reviewed but
as no-one was off they were still hoping to complete the work by June 2024.
Decision
The Audit Committee:
(a) Noted the progress Internal Audit has made with activity in the Internal
Audit Annual Plan 2023/24 to the end of December 2023.
(f) Confirmed that it is satisfied with the performance of the Internal Audit
service provision. 
Page 7 of 114

Page 8

Report No. Report Title Submitted by:
5.4 Internal Audit Work to December 2023 Chief Internal Auditor
Outline of report and summary of discussion
The purpose of this report is to provide members of the Audit Committee with
details of the recent work carried out by Internal Audit and the findings and
recommended audit actions agreed by Management to improve internal controls
and governance arrangements. 
Mr Stainbank in presenting this report advised on the 2 audits which were
completed and highlighted the recommendations as detailed within the
appendices. 
Councillor Smaill with regards to care home raised the issue of the financial stress
and asked if the council was liable to be faced with a large demand from the IJB. 
Ms Barrow in responding advised possibly yes, and that discussions have been
taking place and this has been reported to the IJB and that a financial recovery
plan is in place and has achieved a lot of savings but there still may be a gap for
this financial year and going into next financial year it will be significantly worse. 
Following on from this Mr Smaill asked if this would be brought to some certainty
before the budget setting on the 27 February.   Ms Barrow further updated that
the IJB will meet on 8 February and that there are still some variances around
the assumptions made as part of the overspend position relating to how some of
the internal systems work but still believe there will be a pressure at the end of
the year. 
Decision
The Audit Committee:
(a) Considered the Executive Summaries of the final Internal Audit assurance
reports issued associated with the delivery of the approved Internal Audit
Annual Plan 2023/24.
(b) Noted the Internal Audit Consultancy and Other Work carried out in
accordance with the approved Internal audit Charter.
(c) Acknowledged the assurance provided on internal controls and
governance arrangements in place for the areas covered by this Internal
Audit work. 
Report No. Report Title Submitted by:
5.5 Lease of Premises: Burnbrae Road,
Bonnyrigg
Chief Internal Auditor
Outline of report and summary of discussion
The purpose of this report was to provide members of the Audit Committee with
details of the recent work carried out by Internal Audit following an instruction
from the Council meeting on 29 August 2023.
Page 8 of 114

Page 9

The instruction in the minute was that the Council had agreed: 
• That Internal Auditors investigate the position of the retail unit at
Burnbrae Road, and that the Council are at no undue risk.
• That an update is provided ‘in private’ on the retail unit currently being
constructed adjacent to this building, in Buccleuch Street. 
Mr Stainbank in presenting this report advised that Internal Audit has reviewed the
situation of the retail unit at Burnbrae road which was subject to the inherent
commercial risks of developing retail unit space as part of any place making
development.  Mt Stainbank highlighted the main points contained within the
report confirming that whilst commercial risk had been identified in relation to the
development of this retail unit, this risk was being appropriately managed.  He
further advised that Internal Audit have no concerns over the processes being
undertaken in relation to the units at Buccleuch street that they would bring to the
attention of the Audit Committee although the process remains ongoing. 
The Chair highlighted that he disagreed with the statement that the position of the
retail unit at Burnbrae Road that the Council were at no undue risk and further
highlighted the that it was very concerning that there was no legal guarantee that
the company who signed up to it would take it although the council were
committed to spending the money.  He further advised on how it would work with
the private sector and although the units are now complete there was no legal
signed agreement and while these were empty, there was the risk of vandalism
and there should be a recommendation before a commitment is made to this
amount of money that there is some guarantee that there is a customer at the
back of it.   
Mr Stainbank in responding advised that there is a commercial risk in developing
properties on this basis but advised that getting a legally enforceable  agreement
in place prior to building work commencing is unlikely in these circumstances and
further advised that there was a written agreement  in relation to Burnbrae road
indicating that the company intended to lease the premises when available ,
however that was not legally enforceable as it was not  a full lease at the point
that the development was commencing.   He further advised that it is extremely
difficult to get a company to sign up to a full lease prior to building commercial
properties therefore there is a level of risk in making those decisions to develop
properties. 
The Chair further highlighted that before the council commits to spending this type
of money in the future there should be some reasonable degree of certainty there
is a client at the end of it. 
Councillor Smaill highlighted that at 3.6 of the report it states that there is a major
supermarket retailer and that a final lease is now available for signature during
January 2024 and wondered what stage this was now at and highlighted if there
was a long void period what would be the impact on insurance costs.
.  
Mr Anderson in responding advised that the conclusion was anticipated to be
settled on 9 February 2024 and in terms of Buccleuch Street there was one
Page 9 of 114

Page 10

settlement and the other in negotiation with a favourable expectation of the wider
scope of Dalkeith Town Centre. 
In responding to a further question raised by Councillor Smaill with regards to the
Buccleuch Street units being converted into a residential properties if these were
not taken up as commercial units, advised that while commercial units can be
converted into residential status these were not built with that expectation and it
was unlikely to be a requirement due to the active retail interest in Buccleuch
Street and confirmed also there has been no financial detriment relative to rental
charge for Burnbrae.
Decision
The Audit Committee noted the work undertaken by Internal Audit in response to
the instruction, from the Council on 29 August 2023 to review the lease of the
retail premises at Burnbrae Road Bonnyrigg. 
6 Private Reports 
None 
7 Date of Next Meeting 
Date of Next Meeting: Monday 18 March 2024 at 11am. 
The meeting terminated at 11.39 pm.
Page 10 of 114

Page 11

Audit Committee 
Action Log 
No Subject Date Action Action Owner Expected
completion
date
Comments
1 5.1 Treasury
management 
06/12/2022 Session with members to be
organised with regards to
Responsible treasury
management/ethical issues.
Chief Financial
Officer
Ongoing  Carry forward, paper
coming forward regarding
CSG and ethical
depositing coming later in
the year. 
2 5.2 Annual Accounts
for the year ended 31
March 2023
30/10/2023  Agreed that Members would
discuss the governance
arrangements in place for
reporting any capital projects
overspends within their
individual groups and provide
further feedback to officers
Committee  Recommend for closure:
Capital Plan Prioritisation
reported to council
includes recommended
governance arrangement
changes.
3 5.6 Council House
Building Programme –
Progress Update 2023
30/10/2023 Mr Anderson to report back
in due course on the actual
cost per unit of the 10 houses
within the Buccleuch Street
development
Kevin Anderson June 2024 Recommend for closure:
Passivhouse cost
comparison report on
Council Agenda 27 March
and will forward further
onto Audit Committee
4 4.3 Action Log Hillend
Project 
29/01/2024 Hillend Project was raised,
and Internal Audit confirmed
that the work will be
commencing shortly and will
submit report to the Audit
Committee.
Duncan
Stainbank
June 2024 
Audit Committee
Monday 18 March 2024
Item No 4.2 
Page 11 of 114

Page 12

Page 12 of 114

Page 13

Prepared for The Midlothian Council
March 2024
Midlothian Council
Annual Audit Plan
Audit Committee
Monday 18 March 2024
Item No 5.1
Page 13 of 114

Page 14

Midlothian Council  | 2   
Contents 
Introduction 3
Annual accounts 5
Wider Scope and Best Value 11
Reporting arrangements, timetable, and audit fee 14
Other matters 17
Appendix 1: Your audit team 19
Page 14 of 114

Page 15

Introduction | 3 
Introduction 
Summary of planned audit work
1.  Claire Gardiner has been appointed by the Accounts Commission as external
auditor of Midlothian Council for the period from 2022/23 until 2026/27. The
2023/24 financial year is therefore the second year of the five-year audit
appointment. A brief biography of the audit team is provided at Appendix 1.
2.  This document summarises the work plan for our 2023/24 audit. The main
elements of the audit include:
• an audit of the financial statements and an opinion on whether they give
a true and fair view and are free from material misstatement 
• an audit opinion on other statutory information published with the
financial statements in the annual accounts, including the Management
Commentary, the Annual Governance Statement, and the
Remuneration Report 
• consideration of arrangements in relation to wider scope areas: financial
management; financial sustainability; vision, leadership and
governance; and use of resources to improve outcomes 
• consideration of Best Value arrangements
• providing assurance on the Housing Benefit Subsidy Claim, Non-
Domestic Rates Return, the Whole of Government Accounts (WGA)
return
• a review of Midlothian Council’s arrangements for preparing and
publishing statutory performance information
• provision of an Independent Auditor’s Report expressing my opinions
on the different elements of the annual accounts and an Annual Audit
Report setting out conclusions on the wide scope areas.
Respective responsibilities of the auditor and Midlothian
Council 
3.  The Code of Audit Practice sets out in detail the respective responsibilities of
the auditor and the Midlothian Council. Key responsibilities are summarised below. 
Auditor responsibilities
4.   The auditor’s responsibilities are established by the Local Government
(Scotland) Act 1973 and the Code of Audit Practice (including supplementary
guidance) and guided by the Financial Reporting Council’s Ethical Standard. 
Page 15 of 114

Page 16

Introduction | 4 
5.  Auditors in the public sector give an independent opinion on the financial
statements and other information within the annual accounts. We also review and
report on the wider scope arrangements in place at the Midlothian Council. In
doing this, we aim to support improvement and accountability.
Midlothian Council’s responsibilities
6.  Midlothian Council is responsible for maintaining adequate accounting records
and internal controls, and preparing financial statements for audit that give a true
and fair view. They are also required to produce other reports in the annual
accounts in accordance with statutory requirements.
7.  Midlothian Council has the primary responsibility for ensuring the proper
financial stewardship of public funds, compliance with relevant legislation, and
establishing effective arrangements for governance, propriety, and regularity
that enable them to deliver their objectives.
Adding Value 
8.  We aim to add value by:
• tailoring audit work to the circumstances of Midlothian Council and the
audit risks identified
• being constructive and forward looking
• providing independent conclusions
• attending meetings of the Audit Committee, and 
• recommending and encouraging good practice. 
9.  In so doing, we will help the Midlothian Council promote improved standards
of governance, better management and decision making, and more effective
use of resources. 
Page 16 of 114

Page 17

Annual accounts | 5 
Annual accounts 
Introduction
10.  The annual accounts are an essential part of demonstrating Midlothian
Council’s stewardship of resources and its performance in the use of those
resources.
11.  We are required to perform an audit of the financial statements, consider
other information within the annual accounts, and express a number of audit
opinions in an Independent Auditor's Report in accordance with International
Standards on Auditing (ISAs) in the UK, Practice Note 10 from the Public Audit
Forum which interprets the ISAs for the public sector, and guidance from Audit
Scotland.
12.  We focus our work on the areas of highest risk. As part of our planning
process, we perform a risk assessment highlighting the audit risks relating to
each of the main financial systems relevant to the production of the financial
statements. 
Materiality
13.  The concept of materiality is applied by auditors in planning and performing
the audit, and in evaluating the effect of any uncorrected misstatements on the
financial statements. We to plan our audit to obtain reasonable assurance about
whether the financial statements are free from material misstatement. The
assessment of what is material is a matter of professional judgement over both
the amount and the nature of the misstatement. 
Materiality levels for the 2023/24 audit 
14.  We assess materiality at different levels as described in Exhibit 1. The
materiality values for Midlothian Council and its group are set out in below.
Exhibit 1
2023/24 Materiality levels for Midlothian Council and its group
Materiality Amount
Planning materiality – This is the figure we calculate to assess the overall
impact of audit adjustments on the financial statements. Materiality has been set
based on our assessment of the needs of the users of the financial statements
and the nature of the Midlothian Council’s operations. For the year ended 31
March 2024, we have set our materiality at 2% of gross expenditure based on the
audited financial statements for 2022/23.
£10.2
million
Performance materiality – This acts as a trigger point. If the aggregate of errors
identified during the financial statements audit exceeds performance materiality,
£6.1
million
Page 17 of 114

Page 18

Annual accounts | 6 
this could indicate that further audit procedures are required. Using our
professional judgement, we have assessed performance materiality at 60% of
planning materiality. 
Reporting threshold (i.e. clearly trivial) – We are required to report to those
charged with governance on all unadjusted misstatements more than the
‘reporting threshold' amount. 
£400,000 
Source: Audit Scotland
Significant risks of material misstatement to the financial
statements
15.  Our risk assessment draws on our cumulative knowledge of Midlothian
Council, its major transaction streams, key systems of internal control, and risk
management processes. It is informed by our discussions with management,
meetings with internal audit, attendance at committees, and a review of supporting
information. 
16.  Audit risk assessment is an iterative and dynamic process. Our assessment of
risks set out in this plan may change as more information and evidence becomes
available during the progress of the audit. Where such changes occur, we will
advise management, and where relevant, report them to those charged with
governance.
17.  Based on our risk assessment process, we identified the following significant
risks of material misstatement to the financial statements. These are risks which
have the greatest impact on our planned audit procedures. Exhibit 2 summarises
the nature of the risks, management’s sources of assurance over these risks, and
the further audit procedures we plan to perform to gain assurance over the risks.
Exhibit 2 
2023/24 Significant risks of material misstatement to the financial statements 
Significant risk of
material
misstatement 
Management’s
sources of
assurance  
Planned audit response
1. Risk of material
misstatement due
to fraud caused by
management
override of
controls 
As stated in ISA
(UK) 240,
management is in a
unique position to
perpetrate fraud
Owing to the
nature of this
risk, assurances
from
management
are not
applicable in this
instance.
• Assess the design and implementation of controls
over journal entry processing.
• Make inquiries of individuals involved in the
financial reporting process about inappropriate or
unusual activity relating to the processing of
journal entries and other adjustments.
• Test journals at the year-end and post-closing
entries and focus on significant risk areas. 
• Consider the need to test journal entries and other
adjustments throughout the year.
Page 18 of 114

Page 19

Annual accounts | 7 
Significant risk of
material
misstatement 
Management’s
sources of
assurance  
Planned audit response
because of
management’s
ability to override
controls that
otherwise appear to
be operating
effectively. 
• Evaluate significant transactions outside the
normal course of business.
• Assess any changes to the methods and
underlying assumptions used to prepare
accounting estimates compared to the prior year.
• Carry out substantive testing of income and
expenditure transactions around the year-end to
confirm they are accounted for in the correct
financial year.
• Conduct focussed testing of accounting accruals
and prepayments.
• Assess the adequacy of controls in place for
identifying and disclosing related party relationship
and transactions in the financial statements. 
2. Estimation in
the valuation of
land and
buildings.
There is a
significant degree
of subjectivity in the
valuation of land
and buildings.
Valuations are
based on specialist
and management
assumptions, and
changes in these
can result in
material changes to
valuations. 
All non-current
assets are revalued
on a five-year
rolling basis. Values
may also change
year on year, and it
is important that the
Midlothian Council
ensures the
financial statements
accurately reflect
the value of the
land and buildings.
• Council
procedures
and controls
around
valuation and
accounting.
• Review the information provided to the valuer to
assess for completeness.
• Evaluate the competence, capabilities, and
objectivity of the professional valuer.
• Complete a walkthrough of the valuation process
to obtain an understanding of the process,
including the methodologies and assumptions
applied.
• Obtain an understanding of the management’s
involvement in the valuation process to assess if
appropriate oversight has occurred.
• Examine management’s assessment of any assets
not revalued in 2023/24 against evidence of
changes in other revalued assets.
• Test the reconciliation between the financial ledger
and the property asset register.
• Perform sample testing of individual asset
valuations and lives.
Page 19 of 114

Page 20

Annual accounts | 8 
Significant risk of
material
misstatement 
Management’s
sources of
assurance  
Planned audit response
Due to the inherent
complexity and
subjectivity risks
regarding land,
buildings and
dwellings’
valuations, a
significant risk of
material
misstatement in the
2023/24 valuations
has been identified.
Source: Audit Scotland
18.  As set out in ISA (UK) 240: The auditor’s responsibilities relating to fraud in an
audit of financial statement, there is a presumed risk of fraud over the recognition
of revenue. There is a risk that revenue may be misstated resulting in a material
misstatement in the financial statements. We have considered the risk that
revenue may be misstated resulting in a material misstatement in the financial
statements. 
19.  We have rebutted this risk as funding received from Scottish Government is
clearly communicated and can be readily agreed to third party confirmations. In
addition, Midlothian Council’s other income streams comprise of a high volume of
low value transactions, and we have concluded there is limited opportunity or
incentive to manipulate the recognition of income in the financial statements.
20.  We also considered the risk of fraud over expenditure, as most public bodies
are net spending bodies, and the risk of fraud related to expenditure recognition
may be greater that the risk relating to revenue recognition (in accordance with
Practice Note 10: Audit of Financial Statements and Regularity of Public Sector
Bodies in the UK). We have rebutted the presumption that a material risk exists
within expenditure. This is on the basis that:
• Most expenditure is in areas considered low-risk due to the nature of
the expenditure streams or where individual transactions are relatively
small in scale and therefore are unlikely to result in material
misstatements
• Evidence of external fraud from counter fraud services and the National
Fraud Initiative does not indicate material risk
• Experience in the sector, including a review of past misstatements,
does not indicate material risk. 
Page 20 of 114

Page 21

Annual accounts | 9 
21.  We have not, therefore, incorporated specific work into our audit plan in
these areas over and above our standard audit procedures.
Other areas of audit focus 
22.  As part of our assessment of audit risks, we have identified one other area
where we consider there is also a risk of material misstatement to the financial
statements. Based on our assessment of the likelihood and magnitude of the risk,
we do not consider this to represent a significant risk. We will keep this area under
review as our audit progresses. 
23.  The area of specific audit focus is:
• Valuation of pension liability: The liability requires the use of an
actuarial methodology based on a range of assumptions including
financial and demographic assumptions. Small movements in these can
result in material changes to valuations. We will assess the scope,
independence and competence of the professionals engaged in
providing estimates for pensions and review appropriateness of
actuarial assumptions and results including comparison with other
councils. We will establish officer’s arrangements for ensuring the
reasonableness of professional estimations and the accuracy of
information provided to the actuary by Midlothian Council. 
24.  As part of our risk assessment, we have also identified the following areas
where further work will be performed. These are not audit risks but areas we will
keep under review:
• IFRS 16 takes effect for local government bodies from 2024/25.This will
change the way in which Midlothian Council accounts for operating
leases, including recognising assets and liabilities for the rights and
obligations arising from leases previously classified as operating leases.
We will assess Midlothian Council’s preparedness for this and review
any disclosure made in relation to the new standard in line with
guidance.
• The statutory override relating to valuation of infrastructure assets is
due to end for the 2024/25 financial statements. We will review the
progress made by Midlothian Council in preparing for this.
Group Consideration 
25.  As group auditors, we are required under ISA (UK) 600: Audits of group
financial statements (including the work of component auditors) to obtain
sufficient appropriate audit evidence on which to base our audit opinion on the
group financial statements.
26.  Midlothian Council has a group which comprises component entities, including
subsidiaries, associates, and joint ventures. Our planned audit approach for the
components is informed by our assessment of risk at Midlothian Council and our
consideration of the size and nature of assets, liabilities, and transaction streams.
In addition to Midlothian Council the group comprises four components which we
Page 21 of 114

Page 22

Annual accounts | 10 
have assessed as not financially significant, our procedures with therefore be
limited to agreement to agreement to component accounts and analytical
procedures.
27.  We will obtain sufficient appropriate audit evidence in relation to the
consolidation process to support our group audit opinion. 
Page 22 of 114

Page 23

Wider Scope and Best Value | 11 
Wider Scope and Best Value 
Introduction
28.  Reflecting the fact that public money is involved, public audit is planned and
undertaken from a wider perspective than in the private sector. The Code of
Audit Practice sets out the four areas that frame the wider scope of public
sector audit, and requires auditors to consider and conclude on the
effectiveness and appropriateness of the arrangements in place for each wider
scope area in audited bodies.
29.  In summary, the four wider scope areas are:  
• Financial management – this means having sound budgetary
processes. We will consider the arrangements to secure sound financial
management, including the strength of the financial management
culture, accountability, and arrangements to prevent and detect fraud,
error, and other irregularities. 
• Financial sustainability – we will look ahead to consider whether
Midlothian Council is planning effectively to continue to deliver services.
We will also comment on financial sustainability in the medium (two to
five years) to longer term (longer than five years). 
• Vision, leadership, and governance – we will conclude on the clarity
of plans in place to deliver the vision, strategy, and priorities adopted by
Midlothian Council. We also consider the effectiveness of the
governance arrangements to support delivery. 
• Use of resources to improve outcomes – Midlothian Council must
make best use of their resources to meet stated outcomes and
improvement objectives. We will consider how Midlothian Council
demonstrates economy, efficiency, and effectiveness through the use of
financial and other resources.  
Wider scope risks
30.  We have identified significant risks in the wider scope areas set out in
Exhibit 3. This exhibit sets out the risks, management’s sources of assurance
for the risks, and the further audit procedures we plan to perform to gain
assurances over the risks. 
Exhibit 3
2023/24 Wider scope risks   
Page 23 of 114

Page 24

Wider Scope and Best Value | 12 
Description of risk  Management’s sources
of assurance
Planned audit response
1. Financial
Sustainability
The council’s five-year
financial strategy, which
is considered regularly,
identifies a cumulative
funding gap of £21 million
for the period 2024/25 to
2028/29. 
There is a risk to financial
sustainability and that
there is inadequate
resource to maintain
delivery and quality of
services in the short to
medium term. 
• Regular update of
medium and longer
term financial plans
that take account of
the significant financial
challenges facing the
council.
• Well established
procedures for the
monitoring and
reporting of the
council’s financial
performance.
• The application of
Financial Management
and Control Code of
Practice.
• Review of the council’s annual
budget setting arrangements.
• Assess the adequacy of the
council’s medium and longer
term financial plans.
• Review and assessment of
budget monitoring
arrangements.
• Assess the council’s savings
programme, including the
reasonableness of future
savings plans and the adequacy
of progress reports to
committee.
2. IT Control
Environment
The expansion in the use
of digital technology
across the public sector
increases the risk profile
for public sector bodies
and requires increased
attention to the control
environment.   
We recognise that the
strategic aims with
regards to IT at
Midlothian Council are
developing and we will
consider how
developments in this area
mitigate against wider
sector risks.
• Ongoing development
of strategic aims. 
• Review the IT control
environment and communicate
findings to members of the audit
committee. 
Source: Audit Scotland
31.  Our planned work on the wider scope areas is risk based and proportionate,
and in addition to local risks, we may be asked by the Accounts Commission to
consider specific risk areas which are impacting the public sector as a whole.
We have not been asked to consider specific risks for 2023/24 audits, but we
will remain cognisant of challenges identified in prior years such as climate
change.
Page 24 of 114

Page 25

Wider Scope and Best Value | 13 
Best Value 
32.  Under the Code of Audit Practice, the audit of Best Value in councils is fully
integrated within our annual audit work. Auditors are required to evaluate and
report on the performance of councils in meeting their Best Value duties.
33.  The arrangements to secure Best Value at Midlothian Council will be
assessed over the period of the audit appointment and will include an annual
evaluation of risks and improvement areas and public performance
reporting. We will also follow up findings reported previously on Best Value to
assess the pace and depth of improvement. This work will be integrated with
the wider scope audit areas discussed above.
34.  As part of our annual work on Best Value, we conduct thematic reviews as
directed by the Accounts Commission. In 2023/24, the thematic review across
the sector will be on workforce innovation and will consider how councils are
responding to the current workforce challenges through building capacity,
increasing productivity, and innovation. Our conclusions and judgements will be
reported in a separate report to management and summarised in our Annual
Audit Report.
35.  At least once every five years, the Controller of Audit will report to the
Accounts Commission on Midlothian Council’s performance in meeting its Best
Value duties. Midlothian Council is included in the programme for 2025/26. 
Page 25 of 114

Page 26

Reporting arrangements, timetable, and audit fee | 14 
Reporting arrangements,
timetable, and audit fee 
Reporting arrangements 
36.  Matters arising from our audit will be reported on a timely basis and will include
agreed action plans. Draft reports will be shared with the relevant officers to
confirm factual accuracy. 
37.  We will provide:
• an Independent Auditor’s Report to Midlothian Council and the
Accounts Commission setting out our opinions on the annual accounts
• Midlothian Council and the Accounts Commission with an Annual Audit
Report containing observations and recommendations on significant
matters which have arisen during the audit and conclusions on wider
scope areas. 
38.  Exhibit 4 outlines the target dates for our audit outputs set by the Accounts
Commission. In determining the target reporting date, due regard is paid to the
dates for approving the annual accounts set out in regulations of 30 September
2024.
39.  We will be unable to achieve the target date outlined above. This is due to
the legacy of the late completion of prior year audits due to Covid-19 and
ongoing resourcing challenges within Audit Scotland.  We are working to
prioritise the delivery of high-quality audits in line with messaging from the
Financial Reporting Council who has made it clear that audit quality takes
precedence. 
40.  We are working towards completion of the audit by the later date of 30
November 2024. We will work towards delivering the audit and audit outputs by
target dates over the period of the audit appointment. We acknowledge that our
planned dates are determined by the availability of audit resource and not by
the council, which proposes to present unaudited accounts for audit by 30 June
2024.
Exhibit 4
2020/21 Audit outputs
Audit Output Target date Audit Committee
Date
Annual Audit Plan 31 March 2024 18 March 2024
Page 26 of 114

Page 27

Reporting arrangements, timetable, and audit fee | 15 
Audit Output Target date Audit Committee
Date
Best Value Management Report 24 June 2024 24 June 2024
Independent Auditor's Report 30 September 2024 25 November 2024
Annual Audit Report 30 November 2024 25 November 2024
Source: Audit Scotland
41.  All Annual Audit Plans and the outputs detailed in Exhibit 4, and any other
outputs on matters of public interest, will be published on our website: www.audit-
scotland.gov.uk. 
Timetable
42.  To support an efficient audit, it is critical that the timetable for producing the
annual accounts for audit is achieved. We have included a proposed timetable for
the audit at Exhibit 5 that has been discussed with management. 
43.  We will continue to work closely with management to identify the most efficient
approach as appropriate and will keep timeframes and logistics for the completion
of the audit under review. Progress will be discussed with management and
finance officers over the course of the audit. 
Exhibit 5
Proposed annual accounts timetable  
Key stage    Provisional Date
Consideration of the unaudited annual accounts by those
charged with governance
24 June 2024
Latest submission date for the receipt of the unaudited annual
accounts with complete working papers package.
28 June 2024
Latest date for final clearance meeting with the Director of
Finance
17 October 2024
Issue of draft Letter of Representation and proposed
Independent Auditor’s Report
11 November 2024
Agreement of audited and unsigned annual accounts 11 November 2024
Issue of Annual Audit Report to those charged with governance. 11 November 2024
Signed Independent Auditor’s Report  25 November 2024
Page 27 of 114

Page 28

Reporting arrangements, timetable, and audit fee | 16 
Key stage    Provisional Date
Certified Non-Domestic Rates Return To be confirmed
Certified Housing Benefit subsidy claim To be confirmed
Latest date for WGA assurance (if required)  To be confirmed 
Source: Audit Scotland 
Audit fee
44.  In determining the audit fee, we have taken account of the risk exposure of
Midlothian Council and the planned management assurances in place. Fee levels
are also impacted by inflation which increases the cost of audit delivery. The
planned audit fee for 2023/24 is £289,950 (2022/23: £273,550). 
45.  In setting the fee for 2023/24, we have assumed that Midlothian Council has
effective governance arrangements and will prepare a comprehensive and
accurate set of annual accounts for audit in line with the agreed timetable for the
audit. The audit fee assumes there will be no major change in respect of the
scope of the audit during the year and where our audit cannot proceed as
planned, a supplementary fee may be levied. 
Page 28 of 114

Page 29

Other matters | 17 
Other matters 
Internal audit 
46.  It is the responsibility of the Midlothian Council to establish adequate
internal audit arrangements. We will review the internal audit plan and the
results of internal audit’s work. While we are not planning to place formal
reliance on the work of internal audit in 2023/24, we will review internal audit
reports and assess the impact of the findings on our financial statements and
wider scope audit responsibilities. 
Independence and objectivity
47.  Claire Gardiner, your appointed auditor, is independent of Midlothian
Council in accordance with relevant ethical requirements, including the
Financial Reporting Council’s Ethical Standard. This standard imposes stringent
rules to ensure the independence and objectivity of auditors. 
48.  Audit Scotland has robust arrangements in place to ensure compliance with
Ethical Standard including an annual ‘fit and proper’ declaration for all members
of staff. The arrangements are overseen by the Executive Director of Innovation
and Quality, who serves as Audit Scotland’s Ethics Partner.
49.  The Ethical Standard requires auditors to communicate any relationships
that may affect the independence and objectivity of the audit team. I am not
aware of any such relationships pertaining to the audit of Midlothian Council.
Audit Quality 
50.  Audit Scotland is committed to the consistent delivery of high-quality public
audit. Audit quality requires ongoing attention and improvement to keep pace
with external and internal changes. A document explaining the arrangements for
providing assurance on the delivery of high-quality audits is available from the
Audit Scotland website.
51.  The International Standards on Quality Management (ISQM) applicable to
Audit Scotland for 2023/24 audits are:
• ISQM (UK) 1 which deals with an audit organisation’s responsibilities to
design, implement and operate a system of quality management
(SoQM) for audits. Our SoQM consists of a variety of components, such
as: our governance arrangements and culture to support audit quality,
compliance with ethical requirements, ensuring we are dedicated to
high-quality audit through our engagement performance and resourcing
arrangements, and ensuring we have robust quality monitoring
arrangements in place. Audit Scotland carries out an annual evaluation
of our SoQM and has concluded that we comply with this standard.  
Page 29 of 114

Page 30

Other matters | 18 
• ISQM (UK) 2 which sets out arrangements for conducting engagement
quality reviews, which are performed by senior management not
involved in the audit to review significant judgements and conclusions
reached by the audit team, and the appropriateness of proposed audit
opinions of high-risk audit engagements. 
52.  To monitor quality at an individual audit level, Audit Scotland also carries
out internal quality reviews of a sample of audits. Additionally, the Institute of
Chartered Accountants of England and Wales (ICAEW) carries out independent
quality reviews.
53.  Actions to address deficiencies identified by internal and external quality
reviews are included in a rolling Quality Improvement Action Plan which is used
to support continuous improvement. Progress with implementing planned
actions is regularly monitored by Audit Scotland’s Quality and Ethics
Committee.
54.  Audit Scotland may periodically seek your views on the quality of our
service provision. The team would also welcome feedback more informally at
any time.
Page 30 of 114

Page 31

Appendix 1: Your audit team | 19 
Appendix 1: Your audit team 
The audit team involved in the audit of the Midlothian Council have significant
experience in public sector audit. 
Claire Gardiner
Audit Director
cgardiner@audit-scotland.gov.uk 
Claire has over 19 years of public sector
auditing experience. Claire has worked across
the breadth of the public sector on financial
audits.
Patricia Fraser
Senior Audit Manager
pfraser@audit-scotland.gov.uk 
Patricia has considerable public sector audit
experience and has delivered external audit
services to a range of bodies including local
authorities, health boards and central
government bodies.
Robert Dick
Senior Auditor
rdick@audit-scotland.gov.uk 
Robert has 5 years of public sector audit
experience covering local authorities and
central government.. 
55.  The local audit team is supported by a specialist technical accounting team,
all of whom have significant experience of public bodies and work with
accounting regulatory bodies.
Page 31 of 114

Page 32

Appendix 1: Your audit team | 20 
56.  efficiency.fficiency. 
Audited Body
Draft Annual Audit Plan 2023/24
Audit Scotland’s published material is available for download 
on the website in a number of formats. For information on our 
accessibility principles, please visit:
www.audit-scotland.gov.uk/accessibility
For the latest news follow us on social media or
subscribe to our email alerts. 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh  EH3 9DN
Phone: 0131 625 1500  Email: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk
AS.4.0 
Page 32 of 114

Page 33

Audit Committee
Monday 18 March 2024
Item No 5.2 
Internal Audit Work to February 2024 
Report by Chief Internal Auditor 
Report for Decision 
1 Recommendations 
The Audit Committee is asked to:
a) Consider the Executive Summary of the final Internal Audit assurance report issued
associated with the delivery of the approved Internal Audit Annual Plan 2023/24;
b) Note the Internal Audit Consultancy and Other Work carried out in accordance with the
approved Internal audit Charter; and
c) Acknowledge the assurance provided on internal controls and governance arrangements
in place for the areas covered by this Internal Audit work. 
2 Purpose of Report/Executive Summary 
The purpose of this report is to provide members of the Audit Committee with details of the
recent work carried out by Internal Audit and the findings and recommended audit actions
agreed by Management to improve internal controls and governance arrangements. 
The Internal Audit Annual Plan 2023/24 was approved by the Audit Committee on 7 March
2023. Internal Audit has carried out work associated with the delivery of the plan to meet its
objective of providing an opinion on the efficacy of the Council’s risk management, internal
control and governance. 
An Executive Summary of the final Internal Audit assurance report issued, including audit
objective, findings, good practice and recommendations (where appropriate), and the Chief
Internal Auditor’s independent and objective opinion on the adequacy of the control
environment and governance arrangements within each audit area, is shown in Appendix 1. 
The Internal Audit function conforms to the professional standards as set out in Public Sector
Internal Audit Standards (PSIAS) (2017) including the production of this report to
communicate the results of the reviews. 
Date 5 March 2024 
Report Contact:
Duncan Stainbank
duncan.stainbank@midlothian.gov.uk
Page 33 of 114

Page 34

2
3 Progress Report 
3.1 The Internal Audit Annual Plan 2023/24 was approved by the Audit Committee on 7 March
2023. Internal Audit has completed the following work in the period from 1 January to 29
February 2024 associated with the delivery of the plan to meet its objective of providing an
opinion on the efficacy of the Council’s risk management, internal control and governance. 
3.2 The Internal Audit function conforms to the professional standards as set out in Public Sector
Internal Audit Standards (PSIAS) (2017), including the production of this report to
communicate the results. 
3.3 Internal Audit issued final assurance reports on the following subject:
• Risk Management.  
3.4 An Executive Summary of the final Internal Audit assurance report issued, including audit
objective, findings, good practice and recommendations (where appropriate), and the Chief
Internal Auditor’s independent and objective opinion on the adequacy of the control
environment and governance arrangements within each audit area, is shown in Appendix 1.
The definitions for Internal Audit assurance categories are as follows:
Level Definition
Comprehensive
assurance
Sound risk, control, and governance systems are in place. These should be effective in mitigating
risks to the achievement of objectives. Some improvements in a few, relatively minor, areas may
be required.
Substantial
assurance
Largely satisfactory risk, control, and governance systems are in place. There is, however, some
scope for improvement as current arrangements could undermine the achievement of objectives
or leave them vulnerable to error or misuse.
Limited assurance Risk, control, and governance systems have some satisfactory aspects. There are, however, some
significant weaknesses likely to undermine the achievement of objectives and leave them
vulnerable to an unacceptable risk of error or misuse.
No assurance The systems for risk, control, and governance are ineffectively designed and operated. Objectives
are not being achieved and the risk of serious error or misuse is unacceptable. Significant
improvements are required. 
Internal Audit Consultancy and Other Work
3.5 Internal Audit staff have been involved in the following for the Council to meet its aims and
objectives, and its roles and responsibilities in accordance with the approved Internal Audit
Charter and Strategy:
a) In its critical friend role provided an independent view and challenge at various forums
including: Capital Plan and Asset Management Board, Chief Officers Risk & Resilience
Group, Integrity Group, Children Young People Partnerships Estate Programme Board
and Information Management Group.
b) Learning and development during the research stage of new audit areas for all Internal
Audit team members and through joining virtual audit forums (Computer Audit Sub-group)
and meetings; and
c) Monitored publication of Audit Scotland reports. 
Recommendations
3.6 Recommendations in reports are suggested changes to existing procedures or processes to
improve the controls or to introduce controls where none exist. The grading of each
recommendation reflects the risk assessment of non-implementation, being the product of the
likelihood of the risk materialising and its impact: 
Page 34 of 114

Page 35

3 
High: Significant weaknesses in existing controls, leaving the Council or Service open to error, fraud,
financial loss or reputational damage, where the risk is sufficiently high to require immediate action
within one month of formally raising the issue. Added to the relevant Risk Register and included in the
relevant Assurance Statement.
Medium: Substantial weaknesses in existing controls, leaving the Council or Service open to medium
risk of error, fraud, financial loss or reputational damage requiring reasonably urgent action within
three months of formally raising the issue.
Low: Moderate weaknesses in existing controls, leaving the Council or Service open to low risk of
error, fraud, financial loss or reputational damage requiring action within six months of formally raising
the issue to improve efficiency, effectiveness and economy of operations or which otherwise require to
be brought to attention of senior management.
Outwith the report, Internal Audit informs operational managers about other matters as part of
continuous improvement. 
3.7 The table below summarises the number of Internal Audit recommendations made during
2023/24:
Recs Rating 2023/24 Number of Recs
High 0
Medium 5
Low 1
Sub-total reported this period 6
Previously reported 45
Total 51 
Recommendations agreed with action plan 51
Not agreed; risk accepted 0
Total 51 
4 Report Implications (Resource, Digital, Risk and Equalities) 
4.1 Resource 
Resource implications of implementing Internal Audit recommendations are considered as
part of the audit process to ensure these are reasonable and proportionate to the risks. 
4.2 Digital 
There are no digital implications arising from this report. 
4.3 Risk 
The PSIAS require Internal Audit to evaluate the effectiveness of the Council’s Risk
Management arrangements and contribute to improvements in the process. At the start of
each audit engagement, to capture potential areas of risk and uncertainty more fully, key
stakeholders have been consulted and risk registers have been considered. During each
audit engagement the management of risk has been tested. 
It is anticipated that improvements in the management and mitigation of risks will arise as a
direct result of Management implementing the Internal Audit recommendations made. If audit
recommendations are not implemented, there is a greater risk of financial loss and/or
reduced operational efficiency and effectiveness, and Management may not be able to
demonstrate improvement in internal control and governance arrangements, and effective
management of risks. 
Page 35 of 114

Page 36

4
4.4 Ensuring Equalities 
This report does not relate to a new or revised policy, service or budget change, which
affects people (the public or staff), so an Integrated Impact Assessment (IIA) is not an
applicable consideration. 
The Internal Audit work is carried out in accordance with the appropriate legislation and
professional standards. The latter includes compliance by those within the Internal Audit
function with the Code of Ethics set out in the PSIAS which is appropriate for the profession
of Internal Audit founded as it is on trust placed in its independent and objective assurance
about risk management, internal control and governance. 
4.5 Additional Report Implications (See Appendix 1) 
4.6 Appendices 
Appendix A – Additional Report Implications 
Appendix B – Risk Management Internal Audit Report 
Page 36 of 114

Page 37

5
APPENDIX A – Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Although this report does not relate directly to the key priorities within the Single Midlothian
Plan to which Midlothian Council and its Community Planning Partners have made a
commitment (Reducing the gap in economic circumstances; Reducing the gap in learning
outcomes; Reducing the gap in health outcomes; and Reducing the impact of climate
change), good governance is important to enable Midlothian Council to deliver its key
priorities in support of achieving the Council’s objectives. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working  
Hub and Spoke  
Modern  
Sustainable  
Transformational  
Preventative  
Asset-based  
Continuous Improvement  
One size fits one 
None of the above 
Midlothian Council is committed to creating a great place to grow supported by the 9 drivers
for change. Implementing the 9 drivers for change in practice is applicable to the Council’s
Internal Audit service provision to assist the Council in achieving its objectives. 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you  
Preventative and Sustainable  
Efficient and Modern  
Innovative and Ambitious 
A.4 Delivering Best Value 
The definition of Internal Auditing within the Public Sector Internal Audit Standards (PSIAS) is
“Internal auditing is an independent, objective assurance and consulting activity designed to
add value and improve an organisation’s operations. It helps an organisation accomplish its
objectives by bringing a systematic, disciplined approach to evaluate and improve the
effectiveness of risk management, control and governance processes.” 
Implementation by Management of the actions associated with Internal Audit
recommendations, that are designed to improve internal control and governance
arrangements and management of risks, underpins the Council’s own continuous
improvement arrangements to enhance its effectiveness, thus supporting the delivery of the
Council’s best value duties.
Page 37 of 114

Page 38

6 
A.5 Involving Communities and Other Stakeholders 
The Chief Internal Auditor is accountable to the Audit Committee which, in fulfilling its
governance role, acts as a bridge between the Council and other stakeholders. 
This report has been presented to the Corporate Management Team to outline the key
messages of assurance and areas of improvement. Senior Management relevant to the
areas audited have agreed the final Internal Audit assurance reports as set out in the
relevant Executive Summary within Appendix 1. 
A.6 Impact on Performance and Outcomes 
The Findings and Recommendations from Internal Audit work during the year are designed to
assist the Council in improving its performance and outcomes. 
A.7 Adopting a Preventative Approach 
Internal Audit assurance work includes assessments on when a preventative approach can
be adopted. 
A.8 Supporting Sustainable Development 
This report does not relate directly to supporting sustainable development. Good governance
is important to enable Midlothian Council to achieve its objectives. 
Page 38 of 114

Page 39

Report Summary of key findings and recommendations Recommendations Status
H M L
Subject:  Risk
Management 
Category: Assurance –
Risk-based 
Date issued: 
18/12/2023 Draft 
27/02/2024 Final 
Level of Assurance: 
Substantial in relation to
the Council’s Risk
Management Policy and
application of the policy at
a strategic level.
Limited over the
application of the Risk
Management Policy at the
service (operational) level,
the provision of training
and guidance, and service
level reporting and
monitoring arrangements.  
The Council approved its revised Risk Management Policy and Strategy in August
2022.  The Midlothian Integrated Joint Board (MIJB) have a separate Risk
Management Policy which was last updated in December 2017; management
have advised that the policy is currently under review and intend to update the
policy this year.
The Council’s Risk and Resilience Group meets quarterly to discuss and update
the Council’s Strategic Risk Profile.  The Council’s Corporate Management Team
and Audit Committee receive quarterly updates on the Council’s strategic risks
and steps being taken to mitigate these risks.  The strategic risks for the MIJB are
discussed and updated quarterly and presented to the MIJB Audit and Risk
Committee.  The MIJB risk registers have recently been updated to better reflect
current risks.
Although the Council’s performance reporting system, Ideagen Risk
Management, was being used for tracking of actions, performance indicators, and
to assist with the creation of quarterly performance reports, the risk management
functions of the software were not being used effectively.
Service risk registers within Ideagen for Adult Social Care, Children’s Services,
and Education have not been updated in recent years therefore the risks detailed
in the system no longer reflect the current risks within those services.  Services
advised that risks are reported more informally as part of the Divisional
Management Team (DMT) meetings, but services have not been updating risk
registers consistently in the more detailed format used in Ideagen.  Service risk
registers within Corporate Solutions and Place have had more recent updates for
some of their services, however gaps were noted for some areas.  
The process for producing the quarterly service performance reports was
reviewed and it was identified that in order to produce the report from the system,
the service risks in the Ideagen system were being queried for high risks, but for
most services this was not useful given that the service risk registers had not
been updated in years and no longer represented a current assessment of their
0 5 1 Management have
accepted the factual
accuracy of the
report and its
findings, and agreed
to implement the
recommendations.
Page 39 of 114

Page 40

Report Summary of key findings and recommendations Recommendations Status
H M L
risks.  Service level reporting on risks within the quarterly performance reports
has not been reliable or complete since prior to the Covid-19 pandemic.  
Although risk registers had been updated in 2023 and reported to their respective
boards or committees for the Strategic Risk Profile, the MIJB Risk Register and
the Community Planning Partnership Board, the Ideagen system had not been
updated this year with the new risks / revised risk assessments reported.  Internal
Audit arranged for these updates to be made in the system during the audit.
The previous Internal Audit of Risk Management in 2021 highlighted that there
was limited training, support for managers or sufficient resource to support the
Council’s risk management arrangements and this has not changed. Although
some additional resource has been applied to this area, there is still limited
resource in place.
Internal Audit considers that the level of assurance is substantial in relation to the
Council’s Risk Management Policy and application of the policy at a strategic
level.  Assurance is limited over the application of the Risk Management Policy at
the service (operational) level, the provision of training and guidance, and service
level reporting and monitoring arrangements.  In order for management of risks at
the strategic level to be fully effective, service risk registers should be up-to-date
(i.e. if risks are not logged at the service level, the process for significant service
risks to be escalated to the strategic level will not be fully effective).  It was found
that processes have not been established to formally report on risks to DMTs and
escalate as required, annual reporting and quality assurance arrangements over
risk management has not been established, there is limited risk management
resource in place to support the Council, limited training and guidance is in place
for risk management, the Strategic Risk Profile does not formally link to the
Council’s objectives in the Single Midlothian Plan or operational objectives and
significant project risks are not included in the Council’s performance reporting. 
Page 40 of 114

Page 41

Report Summary of key findings and recommendations Recommendations Status
H M L
Internal Audit made the following recommendations:
• Management should ensure the Strategic Risk Profile links to organisational
objectives as per the Risk Management Policy. A Terms of Reference should
be created for the Risk and Resilience Group and meetings should be
minuted.  The risk management processes should ensure that independent
action plans are drawn up for each Critical Risk that are then reviewed and
assessed on at least a quarterly basis at CMT and Audit Committee to ensure
that risks remain critical for no longer than absolutely necessary. (Low)
• Annual reporting should be in place to provide the Audit Committee with
assurance on compliance with the Risk Management Policy.  Appropriate risk
management procedures and guidance should be in place and available on
the intranet and the officer level risk management group should be reinstated.
(Medium)
• The level of risk management resource required to support the Council should
be considered as part of the planned review of Health, Safety, Risk and
Resilience.  (Medium)
• Chief Officers and Head of Service should ensure that their service risk
registers are appropriately updated by relevant managers within their service
as required.  Arrangements should be established to report on service risks to
DMTs and escalate as required to CMT and the Strategic Risk Register. 
(Medium)
• Management should review with services how to reflect significant project
risks as part of the Council’s performance reporting arrangements and risk
management framework. (Medium)
• Appropriate risk management training and support should be provided to
management including creating an e-learning module, mandatory for relevant
managers, and ongoing periodic 1 to 1 support to facilitate update of their risk
registers. (Medium)
Page 41 of 114

Page 42

Page 42 of 114

Page 43

Audit Committee
Monday 18 March 2024
Item No 5.3 
Counter Fraud Annual Plan 2024/25 
Report by Chief Internal Auditor 
Report for Decision 
1 Recommendations 
The Audit Committee is invited to:
a) Approve the Counter Fraud Annual Plan 2024/25 (Appendix 1). 
2 Purpose of Report/Executive Summary 
The purpose of this report is to gain approval from the Audit Committee
for the proposed Counter Fraud Annual Plan 2024/25 to support the
delivery of the Council’s Counter Fraud Strategy and to demonstrate
compliance with the Council’s Counter Fraud Policy Statement. 
Having robust fraud prevention and investigation arrangements in place
contributes to safeguarding the Council’s financial resources, for
delivery of services, as part of protecting the public purse. A focus on
enhancing fraud prevention and detection to improve Midlothian
Council’s resilience to the risk of fraud, theft, corruption and crime, and
ensure these are embedded preventative practices as specific changes
associated with the Counter Fraud Strategy approved by Council in
August 2020. 
The Counter Fraud Annual Plan 2024/25 (Appendix 1) sets out the
planned counter fraud activity to support the approach and culture of
the Council in tackling fraud and corruption to deliver the Counter
Fraud Strategy. This will enable the Council to demonstrate compliance
with its Counter Fraud Policy Statement as its commitment to tackling
fraud and reflects the Integrity Group’s assessment of counter fraud
controls. 
Date 5 March 2024 
Report Contact:
Duncan Stainbank  
duncan.stainbank@midlothian.gov.uk
Page 43 of 114

Page 44

3 Background 
3.1 A review was carried out in 2019/20 of counter fraud management
arrangements in place and to make improvements in light of the
significant fraud investigations that have occurred within Midlothian
Council in recent years, noting that some are ongoing. 
3.2 The conclusion of the review included a refresh to the corporate policy
and strategy for tackling fraud. A revised Counter Fraud Policy
Statement and Counter Fraud Strategy and proposal to have 2 FTE
Corporate Fraud Officers to deliver the revised Counter Fraud Policy
and Strategy were approved by Midlothian Council in August 2020. 
4        Counter Fraud Annual Plan 2024/25 
4.1 Having robust fraud prevention and investigation arrangements in place
contributes to safeguarding the Council’s financial resources, for
delivery of services, as part of protecting the public purse. A focus on
enhancing fraud prevention and detection to improve Midlothian
Council’s resilience to the risk of fraud, theft, corruption and crime
(including cybercrime and money laundering) and ensure these are
embedded preventative practices as specific changes associated with
the Counter Fraud Strategy approved by Council in August 2020. 
4.2 The Counter Fraud Annual Plan 2024/25 (Appendix 1) sets out the
planned Counter Fraud activity to support the change in approach and
culture for the Council for tackling fraud and corruption to deliver the
approved Counter Fraud Strategy. This will enable the Council to
demonstrate compliance with its Counter Fraud Policy Statement as its
commitment to tackling fraud and reflects the Integrity Group’s
assessment of counter fraud controls (update submitted to the Audit
Committee in January 2022). 
5 Report Implications (Resource, Digital, Risk and Equalities) 
5.1 Resource 
The primary responsibility for the prevention, detection and
investigation of fraud rests with Management, supported by the
Integrity Group and the Corporate Fraud Team. 
The purpose of the Integrity Group is to improve the Council’s
resilience to fraud, corruption, theft and crime (including cybercrime
and money laundering). The formal establishment of the Integrity
Group with a Terms of Reference (approved by the Audit Committee on
22 June 2020) enables the shift to more holistic working in multi-
disciplinary forums to tackle fraud in a consistent and collaborative way
across the Council.   
The revised Counter Fraud Policy Statement and Counter Fraud
Strategy and proposal to have 2 FTE Corporate Fraud Officers to
deliver the revised Counter Fraud Policy and Strategy were approved
by Midlothian Council in August 2020. The 2 Corporate Fraud Officers
are line managed by the Principal Internal Auditor who reports to the
Chief Internal Auditor.
Page 44 of 114

Page 45

Savings will continue to be identified arising from Corporate Fraud
Team activity, which will be stated within the Counter Fraud Annual
Reports presented to the Audit Committee. 
5.2 Digital 
None. 
5.3 Risk 
The Council is committed to minimising the risk of loss due to fraud,
theft, corruption or crime and to taking appropriate action against those
who attempt to defraud the Council, whether from within the authority
or from outside. 
The Counter Fraud Policy Statement sets out the roles and
responsibilities for the prevention, detection and investigation of fraud.
The Counter Fraud Strategy provides a shift in approach to focus on
enhancing fraud prevention and detection to improve Midlothian
Council’s resilience to the risk of fraud. The work undertaken by the
Corporate Fraud Team in collaboration with other Services is designed
to reduce the fraud risks within the Council. 
5.4 Ensuring Equalities 
An Integrated Impact Assessment (IIA) Form was completed as part of
the development of the revised Counter Fraud Policy and Strategy. The
conclusion was that undertaking a Combined Impact Assessment was
not necessary as the policy / proposal has little relevance to equality,
negligible impact on the economy, and no impact on the environment.
The revised Counter Fraud Policy and Strategy set out enhancements
to internal Management arrangements though it is anticipated that
there will be minimal impact on internal staff only; there is no change to
the Whistleblowing external-facing arrangements. 
5.5 Additional Report Implications (See Appendix A)
Page 45 of 114

Page 46

APPENDIX A – Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Although this report does not relate directly to the key priorities within
the Single Midlothian Plan (Reducing the gap in economic
circumstances; Reducing the gap in learning outcomes; Reducing the
gap in health outcomes; and Reducing the impact of climate change)
by preventing and detecting fraud, additional resources might be
available to support the Council’s objectives. Any loss of funds due to
fraud, theft, corruption or crime might impact on the ability of Midlothian
Council to achieve its key priorities. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working  
Hub and Spoke  
Modern  
Sustainable  
Transformational  
Preventative  
Asset-based  
Continuous Improvement  
One size fits one 
None of the above 
Midlothian Council is committed to creating a great place to grow
supported by the 9 drivers for change. Implementing the 9 drivers for
change in practice is applicable to the Council’s arrangements for
tackling fraud as set out in the Counter Fraud Policy Statement and
Counter Fraud Strategy that were approved by Council in August 2020.
The shift to the key drivers for change is an intrinsic part of the change
in approach and culture for the Council for tackling fraud and
corruption. For example:
(a) The formal establishment of an Integrity Group with a Terms of
Reference (approved by the Audit Committee in June 2020) shifting
to more holistic working in multi-disciplinary forums to tackle fraud
in a consistent and collaborative way across the Council;
(b) A focus on enhancing fraud prevention and detection to improve
Midlothian Council’s resilience to the risk of fraud, theft, corruption,
and crime and ensure these are embedded preventative practices; 
(c) Applying the minimum standard within the CIPFA Code of Practice
on ‘Managing the Risk of Fraud and Corruption (2014)’ for counter
fraud policy, strategy and other practices, and adopting the CIPFA
Counter Fraud Maturity Model as a means of self-assessment
moving forward will enable continuous improvement to be
evaluated, managed and evidenced; and
(d) Use of a blend of toolkits such as fraud risk assessments and e-
learning packages that can be tailored to specific Services. 
Page 46 of 114

Page 47

A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you  
Preventative and Sustainable  
Efficient and Modern  
Innovative and Ambitious 
A.4 Delivering Best Value 
Having robust fraud prevention and investigation arrangements in place
contributes to safeguarding the Council’s financial resources, for
delivery of services, as part of protecting the public purse. The
approved Counter Fraud Strategy states the Council will measure
progress against the CIPFA Counter Fraud Maturity Model as a self-
assessment approach to continuous improvement in order to
continuous improvement to be evaluated, managed and evidenced
demonstrate best value in the use of resources. 
A.5 Involving Communities and Other Stakeholders 
Ensuring awareness of the Whistleblowing facility to report areas of
concern is important in the approach to tackling fraud. The facility has
been promoted in recent years and is being utilised, as stated in the
Counter Fraud Annual Report 2022/23 that reported outcomes of
corporate fraud activity, some of which arose from whistleblowing
received from staff, those within communities or other stakeholders. 
A.6 Impact on Performance and Outcomes 
The primary responsibility for the prevention, detection and
investigation of fraud rests with Management, supported by the
Integrity Group and the Corporate Fraud team. Internal Audit provides
advice and independent assurance on the effectiveness of processes
put in place by Management. The Findings and Recommendations
from Internal Audit and Corporate Fraud work which are presented to
the Audit Committee during the year assists the Council in maintaining
and / or enhancing fraud prevention and detection controls. 
A.7 Adopting a Preventative Approach 
Having robust fraud prevention and investigation arrangements in place
contributes to safeguarding the Council’s financial resources, for
delivery of services, as part of protecting the public purse. A focus on
enhancing fraud prevention and detection to improve Midlothian
Council’s resilience to the risk of fraud, theft, corruption and crime, and
ensure these are embedded preventative practices are specific
changes associated with the approved Counter Fraud Strategy. 
A.8 Supporting Sustainable Development 
This report does not relate directly to supporting sustainable
development. Good governance is important to enable Midlothian
Council to achieve its objectives including sustainable outcomes.
Page 47 of 114

Page 48

Midlothian Council Counter Fraud Annual Plan 2024/25          Appendix 1
Ref Category Activity Number
of Days
Commentary
1. Compliance Contract
Management
40 Data analytics to test governance and internal controls in place over Contract
Management arrangements with third parties to assess compliance with
procurement rules.
2. Compliance Corporate Fraud
Enquiries
155 Respond to whistleblowing notifications. 
3. Data Match National Fraud
Initiative
70 Co-ordinate the NFI exercise across Council services, finalise review and
investigate remaining data matches from 2022/23 exercise, coordinate and
finalise provision of data for 2024/25 exercise.  
4. Compliance Social Housing 30 Social Housing enquiries and investigations.
5. Compliance Council Tax  15 Council Tax enquiries and investigations.
6.  Other Corporate Fraud
Policy Framework
15  Support the Integrity Group with monitoring of policies and procedures review,
update and communication. Assist with the self-assessment of compliance
against the CIPFA code on Managing the Risk of Fraud and Corruption.
7. Other Fraud Risk
Assessments
60 Develop a risk assessment process and support operational Service Managers
to assess fraud risks and develop improved mitigating controls in preparation
for the implementation of government guidance on the implementation of UK
government guidance on the Crime of Failure to Prevent Fraud. 
8. Other Fraud Awareness
Training
15 Develop and deliver fraud awareness training modules (face-to-face, virtual or
via e-learning) to Management and Staff as required. 
9. Other Integrity Groups 6 Attend and provide support to the Council’s Integrity Group.  
Corporate Fraud Total 406 
Page 48 of 114

Page 49

Audit Committee
Monday 18 March 2024
Item No 5.4 
Internal Audit Charter 
Report by Chief Internal Auditor 
Report for Decision 
1 Recommendations 
The Audit Committee is invited to:
a) Note the changes to the Internal Audit Charter outlined in section 4 of this
report in conformance with PSIAS; 
b) Approve the revised Internal Audit Charter shown at Appendix 1; and  
c) Note that the Internal Audit Charter will be reviewed annually. 
2 Purpose of Report/Executive Summary 
This report provides the Audit Committee with the updated Internal
Audit Charter for approval that defines the terms of reference for the
Internal Audit function to carry out its role to enable the Chief Audit
Executive to prepare annual Internal Audit opinions on the adequacy of
the overall control environment for Midlothian Council, and for
Midlothian Health and Social Care Integration Joint Board. 
The definition of Internal Auditing within the Public Sector Internal Audit
Standards (PSIAS) is “Internal auditing is an independent, objective
assurance and consulting activity designed to add value and improve
an organisation’s operations. It helps an organisation accomplish its
objectives by bringing a systematic, disciplined approach to evaluate
and improve the effectiveness of risk management, control and
governance processes.” 
In accordance with the Public Sector Internal Audit Standards (PSIAS)
(2017), the purpose, authority and responsibility of the Internal Audit
activity must be formally defined in an Internal Audit Charter, consistent
with the Definition of Internal Auditing, the Code of Ethics and the
Standards. The Chief Audit Executive must periodically review the
Internal Audit Charter and present it to senior management (Corporate
Management team) and the board (Audit Committee) for approval. 
The Internal Audit Charter has been updated in conformance with the
PSIAS for approval by the Audit Committee to ensure that Internal
Audit is tasked to carry out its role in accordance with best Corporate
Governance practice, and is shown in Appendix 1. 
Date 4 March 2024 
Report Contacts
Duncan Stainbank, Chief Internal Auditor 
duncan.stainbank@midlothian.gov.uk      Page 49 of 114

Page 50

3 Background 
3.1 The definition of Internal Auditing within the Public Sector Internal Audit
Standards (PSIAS) is “Internal auditing is an independent, objective
assurance and consulting activity designed to add value and improve
an organisation’s operations. It helps an organisation accomplish its
objectives by bringing a systematic, disciplined approach to evaluate
and improve the effectiveness of risk management, control and
governance processes.” 
3.2 The Midlothian Council Internal Audit function follows the professional
standards as set out in the Public Sector Internal Audit Standards
(PSIAS) which came into effect on 1 April 2013 (amended 2017), along
with the CIPFA Local Government Application Note for the United
Kingdom. The PSIAS have been developed by the standard setters
(CIPFA for local government) through the Internal Audit Standards
Advisory Board (IASAB) and have been based on the Institute of
Internal Auditors International Standards of Professional Practice. 
3.3 In accordance with the PSIAS, the purpose, authority and responsibility
of the Internal Audit activity must be formally defined in an Internal
Audit Charter, consistent with the Definition of Internal Auditing, the
Code of Ethics and the Standards. The Chief Audit Executive must
periodically review the Internal Audit Charter and present it to ‘senior
management’ (Corporate Management Team) and the ‘board’ (Audit
Committee) for approval. 
3.4 Within the PSIAS a Public Sector requirement states the Internal Audit
Charter must also:
o define the terms ‘board’ and ‘senior management’ for the
purposes of Internal Audit activity;
o cover the arrangements for appropriate resourcing;
o define the role of Internal Audit in any fraud-related work; and
o include arrangements for avoiding conflicts of interest if Internal
Audit undertakes non-audit activities. 
3.5 Internal Audit assurance resources and services are also provided by
Midlothian Council’s Internal Audit team to the Midlothian Health and
Social Care Integration Joint Board (MIJB), including the appointed
MIJB Chief Internal Auditor. The Internal Audit Charter and Strategy
are applicable to each organisation. 
4 Internal Audit Charter   
4.1 The authority for Internal Audit to operate in Midlothian Council is
contained in the Council’s Local Code of Corporate Governance,
Standing Orders, and Financial Regulations. This Internal Audit Charter
expands upon that framework. 
4.2 The Internal Audit Charter as shown in Appendix 1 to this report:
establishes the Internal Audit activity’s position within the organisation,
including the nature of the Chief Audit Executive’s functional reporting
relationship with the board; authorises access to records, personnel
and physical properties relevant to the performance of engagements;
and defines the scope of Internal Audit activities. 
Page 50 of 114

Page 51

4.3 The Internal Audit Charter, which was previously approved by the Audit
Committee on 7 March 2023, has been updated by the Chief Audit
Executive (shared Chief Internal Auditor). The summary of the changes
reflect the following:
• The Change in title of the Section 95 Officer. 
4.4 The Internal Audit Charter should be considered alongside the Internal
Audit Strategy and Plan 2024/25. The Internal Audit Strategy sets out
the Council’s assurance framework within which Internal Audit
operates, and the Chief Audit Executive’s strategy for discharging its
role and providing the necessary annual assurance opinions to
Midlothian Council and Midlothian Health and Social Care Integration
Joint Board (MIJB). The Internal Audit Charter and Strategy are
applicable to these organisations. There are separate Internal Audit
Annual Plans for each organisation, which set out the range and
breadth of audit activity. 
5 Report Implications (Resource, Digital, Risk and Equalities) 
5.1 Resource 
The Local Authority Accounts (Scotland) Regulations 2014 that came
into force on 10 October 2014 require a local authority to operate a
professional and objective internal auditing service. 
Internal Audit must have sufficient staff and other resources to enable it
to carry out the objectives of the Charter and to deliver a programme of
independent and objective audit assurance work alongside other
available sources of assurance to enable the Chief Audit Executive to
prepare annual opinions on the adequacy of the overall control
environment for Midlothian Council and the MIJB. Internal Audit
resources are set out in the Internal Audit Strategy and Plan 2022/23. 
5.2 Digital 
There are no digital implications arising from this report. 
5.3 Risk 
The authority for Internal Audit to operate in Midlothian Council is
contained in the Council’s Local Code of Corporate Governance,
Standing Orders, and Financial Regulations. This Internal Audit Charter
expands upon that framework. 
Approval of the Internal Audit Charter (Appendix 1), as recommended
in this report, will ensure that Internal Audit is tasked to carry out its role
in accordance with PSIAS and best Corporate Governance practice. 
Page 51 of 114

Page 52

The PSIAS require Internal Audit to evaluate the effectiveness of the
Council’s Risk Management arrangements and contribute to
improvements in the process. The work of Internal Audit (including its
opinion on the control environment) shall contribute to the Council’s
review of its corporate governance arrangements the outcome of which
is published in the Annual Governance Statement. 
At all times, Management’s responsibilities (led by the Corporate
Management Team) include:
o Designing and maintaining proper risk management, governance
and internal control processes and systems for which they have
responsibility to ensure probity in systems and operations,
including the prevention, detection and resolution of fraud and
irregularities. These are not fixed but evolve as the Council
changes.
o Checking that these governance arrangements and internal
controls are operating effectively and obtaining assurances from
internal compliance, risk, inspection, quality, and control functions.
(The above are known as the first and second lines.)
o Engaging with Internal Audit (the third line) in a positive way to
achieve shared goals for robust internal control and governance,
best value and improvement, and ensuring that Internal Audit can
properly fulfil its role.
o Considering and acting upon Internal Audit findings and
recommendations, including implementation of audit
recommendations within agreed timescales and updating Pentana
performance system, or accepting responsibility for any resultant
risk from not doing so.
o Seeking advice and consultancy support from Internal Audit on
existing controls and on changes to and transformation of
governance, processes and procedures. 
5.4 Ensuring Equalities 
This report does not relate to a new or revised policy, service or budget
change, which affects people (the public or staff), so an Integrated
Impact Assessment (IIA) is not an applicable consideration. 
The Internal Audit work is carried out in accordance with the
appropriate legislation and professional standards. The latter includes
compliance by those within the Internal Audit function with the Code of
Ethics set out in the PSIAS. This is of particular importance and
relevance for the profession of Internal Audit founded as it is on trust
placed in its independent and objective assurance about risk
management, internal control and governance. 
5.5 Additional Report Implications (See Appendix A) 
Page 52 of 114

Page 53

APPENDIX A – Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Although this report does not relate directly to the key priorities within
the Single Midlothian Plan to which Midlothian Council and its
Community Planning Partners have made a commitment (Reducing the
gap in economic circumstances; Reducing the gap in learning
outcomes; Reducing the gap in health outcomes; and Reducing the
impact of climate change), good governance is important to enable
Midlothian Council to deliver its key priorities in support of achieving the
Council’s objectives. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working  
Hub and Spoke  
Modern  
Sustainable  
Transformational  
Preventative  
Asset-based  
Continuous Improvement  
One size fits one 
None of the above 
Midlothian Council is committed to creating a great place to grow
supported by the 9 drivers for change. Implementing the 9 drivers for
change in practice is applicable to the Council’s Internal Audit service
provision to assist the Council in achieving its objectives. 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you  
Preventative and Sustainable  
Efficient and Modern  
Innovative and Ambitious 
A.4 Delivering Best Value 
The definition of Internal Auditing within the Public Sector Internal Audit
Standards (PSIAS) is “Internal auditing is an independent, objective
assurance and consulting activity designed to add value and improve
an organisation’s operations. It helps an organisation accomplish its
objectives by bringing a systematic, disciplined approach to evaluate
and improve the effectiveness of risk management, control and
governance processes.” 
Internal Audit is a key element of good governance which is important
to enable Midlothian Council to achieve its objectives. Page 53 of 114

Page 54

Recommendations made by Internal Audit underpin the Council’s own
continuous improvement arrangements to enhance its effectiveness,
thus supporting the delivery of the Council’s best value duties. 
A.5 Involving Communities and Other Stakeholders 
The Chief Audit Executive is accountable to the Audit Committee
which, in fulfilling its governance role, acts as a bridge between the
Council and other stakeholders. 
A.6 Impact on Performance and Outcomes 
Applying the framework of the PSIAS will give the Audit Committee
assurance that the Internal Audit function is compliant with legislative
requirements and current best practice. 
A.7 Adopting a Preventative Approach 
The PSIAS are applicable from 1 April 2013 (amended 2017) which
means the Internal Audit Service has taken steps to be fully compliant. 
A.8 Supporting Sustainable Development 
This report does not relate directly to supporting sustainable
development. Internal Audit is a key element of good governance which
is important to enable Midlothian Council to achieve its objectives
including sustainable outcomes.
Page 54 of 114

Page 55

1 
INTERNAL AUDIT CHARTER      Appendix 1
INTRODUCTION
The Public Sector Internal Audit Standards (PSIAS) requires that the purpose, authority and
responsibility of the Internal Audit activity must be formally defined in an Internal Audit Charter,
consistent with the Definition of Internal Auditing, the Code of Ethics and the International
Standards for the Professional Practice of Internal Auditing (Standards) detailed in the PSIAS.  
Midlothian Council has adopted from the PSIAS1: the definition of Internal Auditing “Internal
auditing is an independent, objective assurance and consulting activity designed to add value and
improve an organisation’s operations. It helps an organisation accomplish its objectives by
bringing a systematic, disciplined approach to evaluate and improve the effectiveness of risk
management, control and governance processes”, the Mission Statement of Internal Audit “To
enhance and protect organisational value by providing risk-based and objective assurance, advice
and insight” and the Core Principles. 
OBJECTIVES OF INTERNAL AUDIT
Internal Audit’s responsibility is to report to Midlothian Council on its assessment of the adequacy
of the entire control environment, through the Corporate Management Team (‘senior
management’) and the Audit Committee (the ‘board’ for the purposes of Internal Audit activity).
Internal Audit adds value to the organisation (and its stakeholders) by enhancing governance, risk
management and control processes and objectively providing relevant assurance.
As part of Midlothian Council’s system of corporate governance, Internal Audit’s purpose is to
support the Council in its activities designed to achieve its declared objectives and to do so:
➢ In support of the Council’s vision, values and priorities.
➢ As a contribution to the Council’s corporate management of risk, including assisting
Management to improve the risk identification and management process in particular where
there is exposure to significant financial, strategic, reputational and operational risk to the
achievement of the Council’s objectives.
➢ As an aid to ensuring that the Council and its elected members, employees and contracted
third parties are operating within the law and relevant regulations, and that public money is
safeguarded and properly accounted for, and used economically, efficiently and effectively.
➢ As a contribution towards establishing and maintaining a culture of honesty, integrity,
openness, accountability and transparency throughout the Council in all its activities and
transactions.
➢ As a contribution towards ensuring that financial statements and other published
performance information are accurate and reliable.
Midlothian Council’s Internal Audit function provides assurance services to the Midlothian Health
and Social Care Integration Joint Board (MIJB) and will apply the same standards as defined in
this Charter to any work undertaken for MIJB, with separate Internal Audit plans and reports
presented to its ‘senior management’ (MIJB Chief Officer and MIJB Chief Finance Officer) and to
the ‘board’ (MIJB Audit and Risk Committee). 
1 Public Sector Internal Audit Standards (PSIAS) (2017)
Midlothian
Page 55 of 114

Page 56

2 
POSITION OF INTERNAL AUDIT WITHIN MIDLOTHIAN COUNCIL 
In terms of the PSIAS, the status of Internal Audit should enable it to function effectively, with
recognition of the independence of Internal Audit fundamental to its effectiveness. The Chief Audit
Executive (CAE) should have “sufficient status to facilitate the effective discussion of audit
strategies, plans, results and improvement plans with senior management of the organisation.2” 
The CAE within Midlothian Council (the shared Chief Internal Auditor) has full access to those
charged with governance, specifically the Elected Members and the Corporate Management
Team. The latter includes the Council’s statutory officers: head of paid service (Chief Executive),
s95 finance officer (Chief Financial Officer), monitoring officer (Legal & Governance Manager) and
chief social work officer (Chief Officer Children’s Services, Partnerships and Communities). The
CAE has free and unfettered access to the Chair of each organisation’s ‘board’ to discuss any
matters the members or auditors believe should be raised privately.
In terms of accountability and independence to ensure conformance with PSIAS, the CAE reports
functionally to the Midlothian Council Audit Committee. In this context functional reporting3 means
the Audit Committee will:
➢ Approve the Internal Audit Charter.
➢ Approve the risk-based Internal Audit Annual Plan.
➢ Ratify the Internal Audit budget and resource plan to ensure that Internal Audit is
adequately resourced to meet assurance and other key responsibilities.
➢ Receive communications from the CAE on the Internal Audit activity’s performance relative
to its plan and other matters.
➢ Ratify all decisions regarding the appointment or removal of the CAE.
➢ Provide feedback to contribute to the performance appraisal of the CAE.
➢ Make appropriate enquiries of Management and the CAE to determine whether there are
inappropriate scope or resource limitations.
The CAE is line managed by the Chief Executive but retains responsibility for all operational audit
activity and reports in their own name and retains final right of edit over all Internal Audit reports.
The reporting line is managed in a manner which: ensures the CAE is accorded open and direct
communication with Management; and ensures the CAE and the Internal Audit function have an
adequate and timely flow of information concerning the activities, plans and initiatives of the
Council and IJB.
RIGHTS OF ACCESS
The CAE and any member of the Internal Audit function authorised by them, relevant to the
delivery of audit engagements for each of the organisations, has authority to:
➢ Have access at any reasonable times to all computer systems and records (paper/digital).
➢ Require and receive explanations concerning any matter under examination from personnel
relevant to their roles including Elected Members / Board Members.
➢ Enter at all reasonable times and without notice any properties, provided that where such
properties are leased to a third party the terms of the lease are observed.
➢ Require personnel to produce cash, stores, or other assets under their control.
Internal Audit safeguards all information obtained in the carrying out of its duties, only uses it for
defined purposes and makes no disclosure of any information held, unless this is authorised or
there is a legal or professional requirement to do so. 
2 Internal Audit Standards Advisory Board (IASAB) Public Sector Internal Audit Standards (PSIAS) (2017)
3 Chartered Institute of Internal Auditors (CIIA) – International Standards for Professional Practice of Internal Auditing
Page 56 of 114

Page 57

3 
SCOPE OF INTERNAL AUDIT ACTIVITY
For each organisation Internal Audit shall systematically review, appraise, make appropriate
recommendations for improvement, and report upon:
• the governance arrangements and processes;
• the design, implementation and effectiveness of ethics-related objectives, programmes and
activities;
• the information technology governance in support of  strategies and objectives;
• the systems and processes in place to ensure effective performance management and
accountability;
• the effectiveness and appropriateness of controls and other arrangements put in place to
manage risk;
• the potential for the occurrence of fraud and how fraud risk is managed;
• the completeness, reliability, integrity and timeliness of information, both financial and
operational; 
• the systems and processes established to ensure compliance with policies, plans,
procedures, laws, and regulations, whether established internally or externally, and that
employees’ actions are in compliance;
• the action(s) taken to address significant legislative or regulatory issues; 
• the effectiveness of arrangements for safeguarding assets and interests; 
• the economy, efficiency and effectiveness with which resources are deployed; 
• the effectiveness and efficiency of operations and programmes; and
• the extent to which operations are being carried out as planned and strategic objectives and
goals are met.
Internal Audit’s work covers:
• all activities, systems, processes, controls, policies, and protocols that are currently existing
or under development;
• all records, personnel and properties; and 
• all services and other activities for which each organisation is responsible or accountable,
whether delivered directly or by third parties through contracts, partnerships or other
arrangements.
AUDIT RESOURCES AND WORK PRIORITISATION
The CAE ensures that Internal Audit resources are appropriate, sufficient and effectively deployed
to achieve the approved plan. Appropriate refers to the mix of qualifications, knowledge, skills and
other competencies needed to perform the plan such as compliance with the Code of Ethics set
out in the PSIAS and with the Nolan principles established in the Seven Principles of Public Life.
This is of particular importance and relevance for the profession of Internal Audit, founded as it is
on the trust placed in its objective assurance about risk management, internal control and
governance. The CAE holds a professional qualification (Bsc Hons, CIPFA) and is suitably
experienced. Sufficient refers to the quantity of resources needed to accomplish the plan.
Resources are effectively deployed when they are used in a way that optimises the achievement
of the approved plan. 
The Internal Audit Strategy, as approved by the Midlothian Council Audit Committee, outlines the
strategic direction for how Internal Audit will achieve its objectives in conformance with PSIAS. It
guides the Internal Audit function in delivering high quality Internal Audit services to Midlothian
Council and the MIJB.
The Midlothian Council Internal Audit Annual Plan, as approved by the Audit Committee, is the
main determinant of the relative priority to be placed on each part of the work of Internal Audit,
with an Internal Audit Annual Plan specific to the MIJB being approved and monitored by its
‘senior management’ and ‘board’ (MIJB Audit and Risk Committee). The Internal Audit planning
Page 57 of 114

Page 58

4 
process, to determine the priorities of the Internal Audit activity consistent with the organisation’s
goals, includes consideration of the organisation’s priorities, plans, strategies, objectives, risks and
mitigating controls, and the internal and external assurances provided. The CAE determines the
actual deployment of available resources covering the range and breadth of audit areas which are
integral to the assurance process across the activities of Midlothian Council and MIJB in order to
provide the statutory annual Internal Audit opinion to each organisation’s ‘senior management’ and
‘board’. This plan also requires to be sufficiently flexible to reflect the changing risks and priorities
of each organisation.
The Plan has within it the provision of resources as Contingency to respond to specific control
issues highlighted during the year and covering other unforeseen variations in the level of
resources available to Internal Audit, such as staff vacancies.
The Plan has within it the provision of resources for Internal Audit ‘critical friend’ Consultancy that
are valued by Management to support them in delivering innovation, change and transformation.
Requests are considered and approved by the CAE subject to any consultancy activity being
deliverable within the boundaries of the role of Internal Audit and the resources available. 
In the event that there is a need for a greater audit work to provide the statutory audit opinions
than there are resources available, the CAE will identify the shortfall in the Plan and initially advise
the Chief Executive followed by the Audit Committee.  It will be for the Audit Committee to decide
whether to accept the risks associated with the non-delivery of such audit work or to recommend
to the Council that it requires Management to identify additional resources.  
NON-AUDIT ACTIVITIES
The Internal Audit service preserves its independence and objectivity by: ensuring that staff are
free from any conflicts of interest when undertaking assurance audits by following the
requirements of relevant professional bodies and HR policies; and providing clarity on duties
undertaken during audit consultancy engagements to ensure these do not impact on assurance
audits and do not impair its independence and objectivity.
APPROVAL
The Internal Audit Charter was reported to and approved by the Midlothian Council Audit
Committee at its meeting on 18 March 2024 and shall be subject to regular review by the CAE and
the Audit Committee. 
Page 58 of 114

Page 59

Audit Committee
Monday 18 March 2024
Item No 5.5 
Internal Audit Strategy and Annual Plan 2024/25 
Report by Chief Internal Auditor 
Report for Decision 
1 Recommendations 
The Audit Committee is invited to:
a) Note the changes to the Internal Audit Strategy outlined in section 4
of this report; 
b) Note the outline of the Internal Audit planning process outlined in
section 5 of this report;
c) Approve the Internal Audit Strategy (Appendix 1); and  
d) Approve the Internal Audit Annual Plan 2024/25 (Appendix 2). 
2 Purpose of Report/Executive Summary 
The purpose of this report is to gain approval from the Audit Committee
to the proposed Internal Audit Strategy and Annual Plan 2024/25 to
enable the Chief Internal Auditor to prepare annual opinions on the
adequacy of the overall control environment for Midlothian Council, and
Midlothian Health and Social Care Integration Joint Board (MIJB). 
The Internal Audit Strategy at Appendix 1 outlines the strategic
direction for how Internal Audit will achieve its objectives, which are set
out in the Internal Audit Charter, in conformance with PSIAS. It guides
the Internal Audit function in delivering high quality internal audit
services to Midlothian Council and the MIJB. 
The Internal Audit Annual Plan 2024/25 at Appendix 2 has been
developed by the shared Chief Internal Auditor and the Principal
Internal Auditor. It sets out the proposed range and breadth of audit
activity within the audit programme of work to enable the Chief Internal
Auditor to prepare the independent and objective audit opinions for
Midlothian Council and the MIJB. A separate Internal Audit Annual Plan
2024/25 for the MIJB will be presented to its Audit and Risk Committee.
Key components of the audit planning process include a clear
understanding of each organisation’s functions, associated risks, and
assurance framework. 
Date 5 March 2024 
Report Contacts
Duncan Stainbank, Chief Internal Auditor 
duncan.stainbank@midlothian.gov.uk     
Page 59 of 114

Page 60

3 Background 
3.1 The Local Authority Accounts (Scotland) Regulations 2014 that came
into force on 10 October 2014 require a local authority to operate a
professional and objective internal auditing service. This service must
be provided in accordance with recognised standards and practices in
relation to internal auditing. Recognised standards and practices are
those set out in the Public Sector Internal Audit Standards: Applying
the IIA International Standards to the UK Public Sector (PSIAS). The
standards require internal audit to have suitable operational
independence from the organisation. 
3.2 The Midlothian Council Internal Audit function follows the professional
standards as set out in Public Sector Internal Audit Standards (PSIAS)
effective 1 April 2013 (updated 2017) which requires the Chief Audit
Executive (CAE) to establish risk-based plans to determine the
priorities of the Internal Audit activity, consistent with the organisation’s
goals. The plans also require to be sufficiently flexible to reflect the
changing risks and priorities pertaining to each organisation. 
3.3 A fundamental role of the Council’s Internal Audit function is to provide
senior management and members with independent and objective
assurance, which is designed to add value and improve the
organisation’s operations. In addition, the CAE is also required to
prepare an Internal Audit annual opinion on the adequacy of each
organisation’s overall control environment. 
3.4 Internal Audit resources and services are also provided by Midlothian
Council’s Internal Audit team to the Midlothian Health and Social Care
Integration Joint Board (MIJB), including the appointed MIJB Chief
Internal Auditor. The Internal Audit Charter and Strategy are applicable
to each organisation. 
4        Internal Audit Strategy 
4.1 The key standards within the PSIAS which relate to Managing the
Internal Audit Activity are summarised below:
“The chief audit executive must effectively manage the internal audit
activity to ensure it adds value to the organisation.
The internal audit activity is effectively managed when:
• The results of the internal audit activity’s work achieve the
purpose and responsibility included in the internal audit charter;
• The internal audit activity conforms with the Definition of Internal
Auditing and the Standards; and
• The individuals who are part of the internal audit activity
demonstrate conformance with the Code of Ethics and the
Standards.
The internal audit activity adds value to the organisation (and its
stakeholders) when it provides objective and relevant assurance, and
contributes to the effectiveness and efficiency of governance, risk
management and control processes.” 
Page 60 of 114

Page 61

4.2 The Chief Internal Auditor (CAE) and the Principal Internal Auditor have
developed the Internal Audit Strategy at Appendix 1. It outlines the
strategic direction for how Internal Audit will achieve its objectives,
which are set out in the Internal Audit Charter, in conformance with
PSIAS. It guides the Internal Audit function in delivering high quality
internal audit services to Midlothian Council and the Midlothian Health
and Social Care Integration Joint Board (MIJB). 
4.3 The Internal Audit Strategy, since its previous approval by the Audit
Committee on 7 March 2023, reflects the following:
• 3.1 change in wording endorsed by the Chartered Institute of
Internal Audit from lines of defence to lines of assurance; and
• 4.2 change in title of the section 95 officer for Midlothian Council. 
4.4 The Internal Audit Strategy:
• Outlines the assurance framework, providing clarity of the
respective responsibilities of Management for designing and
monitoring governance and control systems and of the role of
Internal Audit in providing independent assurance thereon;
• States how the key themes which are integral to the assurance
gathering process across the organisation’s activities will be
covered to inform the annual Internal Audit opinion statement;
• Describes the approach to the development of the risk based
Internal Audit annual plan;
• Sets out the relative allocation of Internal Audit resources;
• Outlines how the Internal Audit programme of work will be
delivered to add value; and
• Describes the monitoring and reporting of Internal Audit findings
from its work and progress with its plans to the relevant
organisation’s audit committee/board. 
5        Internal Audit Annual Plan 2024/25 
5.1 The key standards within the PSIAS which relate to the preparation of
the internal audit plan are summarised below:
• Standard 2010 – Planning which states that “the chief audit
executive must establish risk-based plans to determine the
priorities of the internal audit activity, consistent with the
organisation’s goals”
• Standard 2020 – Communication and Approval which states that
“the chief audit executive must communicate the internal audit
activity’s plans and resource requirements, including significant
interim changes, to senior management and the board for review
and approval. The chief audit executive must also communicate the
impact of resource limitations.” 
5.2 The CIPFA Publication ‘Audit Committees: Practical Guidance for Local
Authorities and Police – 2018 Edition’ states that “The audit committee
should seek to make best use of the internal audit resource within the
assurance framework. In particular, the audit committee should seek
confirmation from internal audit that the audit plan takes into account
the requirement to provide an annual internal audit opinion that can be
used to inform the Annual Governance Statement. Specific activities
will include: Page 61 of 114

Page 62

• Approving (but not directing) the risk-based plan, considering the
use made of other sources of assurance.” 
5.3 The CIPFA Publication also states that “The committee will wish to
seek assurance from the HIA that appropriate risk assessment has
been carried out as part of the preparation of the internal audit plans
when they are presented.” 
5.4 The Chief Internal Auditor (CAE) and the Principal Internal Auditor have
developed the Internal Audit Annual Plan 2024/25 at Appendix 2,
based on the Internal Audit staff resources set out in 6.1. It sets out the
proposed range and breadth of audit activity to be undertaken to
provide the independent and objective audit opinions to Midlothian
Council and the MIJB. 
5.5 As part of the Internal Audit planning process, it was necessary to
consider each organisation’s priorities, plans, strategies, objectives,
risks and mitigating controls, and the internal and external assurances
provided to determine the priorities of the Internal Audit activity
consistent with the organisation’s goals, as follows:
• Analysis was undertaken of Internal Audit work during the past 5
years against the Audit Universe which has been significantly
revised and realigned by the Principal Internal Auditor to reflect
the current strategic and operational management arrangements
and approach to service delivery to ensure appropriate coverage;
• The Strategic Risk Profile was checked to confirm coverage on
key strategic risks, as reliance is placed on the risk assessments
carried out by the Risk Owners taking account of the risk ratings
and mitigations; and 
• Account was taken of known external audit and inspection
activities to avoid duplication of assurance work. 
5.6 It is envisaged that 2024/25 will continue to be a year of change for the
Council and other partner organisations. Therefore the Internal Audit
Annual Plan 2024/25 should be considered to be flexible and will be
periodically reviewed, and amended as required, to reflect any new
arrangement or changing risks and priorities or available resources.
Any amendments relating to the Council will be brought to the
Corporate Management Team and the Audit Committee for approval. 
5.7 The Non-MLC days reflect the Council’s partnership working
commitment to provide Internal Audit resource and services to the
Midlothian Health and Social Care Integration Joint Board (MIJB). A
separate Internal Audit Annual Plan 2024/25 has been presented to the
MIJB Audit and Risk Committee for approval. 
Page 62 of 114

Page 63

6 Report Implications (Resource, Digital, Risk and Equalities) 
6.1 Resource 
The Local Authority Accounts (Scotland) Regulations 2014 that came
into force on 10 October 2014 require a local authority to operate a
professional and objective internal auditing service. 
Internal Audit must have sufficient staff and other resources to enable it
to carry out the objectives of the Charter and to deliver a programme of
independent and objective audit assurance work alongside other
available sources of assurance to enable the Chief Audit Executive to
prepare annual opinions on the adequacy of the overall control
environment for Midlothian Council, and the MIJB. 
The Internal Audit staff resource totalling 3.22 FTE comprises Chief
Internal Auditor (0.5 FTE), Principal Internal Auditor (0.72 FTE) and
Internal Auditor (2.0 FTE). Each member of the current Internal Audit
team has a professional internal audit or accountancy qualification, and
has suitable experience, knowledge, skills and competencies (such as
the Code of Ethics set out in PSIAS and the Seven Principles of Public
Life) needed to deliver the Plan. After deduction for estimated annual
leave, public holidays, absence including staff turnover, learning and
development, and management and supervision, this equates to a total
of 522 days available for Internal Audit activity (2023/24 plan 522
days). 
6.2 Digital 
There are no digital implications arising from this report. 
6.3 Risk 
The Objectives of Internal Audit are set out in its Charter, including “As
part of Midlothian Council’s system of corporate governance, Internal
Audit’s purpose is to support the Council in its activities designed to
achieve its declared objectives and to do so: as a contribution to the
Council’s corporate management of risk.” 
Key components of the audit planning process include a clear
understanding of the Council’s functions, associated risks, and
potential range and breadth of audit activity for inclusion within the
plan. As in previous years, to capture potential areas of risk and
uncertainty more fully, reference has been made to the Strategic Risk
Profile and key stakeholders have been consulted. 
The PSIAS require Internal Audit to evaluate the effectiveness of the
Council’s Risk Management arrangements and contribute to
improvements in the process. The work of Internal Audit (including its
opinion on the control environment) shall contribute to the Council’s
review of its corporate governance arrangements, the outcome of
which is published in the Annual Governance Statement. 
At all times, Management’s responsibilities (led by the Corporate
Management Team) include:
Page 63 of 114

Page 64

o Designing and maintaining proper risk management, governance
and internal control processes and systems for which they have
responsibility to ensure probity in systems and operations,
including the prevention, detection and resolution of fraud and
irregularities. These are not fixed but evolve as the Council
changes.
o Checking that these governance arrangements and internal
controls are operating effectively and obtaining assurances from
internal compliance, risk, inspection, quality, and control functions.
(The above are known as the first and second lines.)
o Engaging with Internal Audit (the third line) in a positive way to
achieve shared goals for robust internal control and governance,
best value and improvement, and ensuring that Internal Audit can
properly fulfil its role.
o Considering and acting upon Internal Audit findings and
recommendations, including implementation of audit
recommendations within agreed timescales and updating Pentana
performance system, or accepting responsibility for any resultant
risk from not doing so.
o Seeking advice and consultancy support from Internal Audit on
existing controls and on changes to and transformation of
governance, processes and procedures. 
6.4 Ensuring Equalities 
This report does not relate to a new or revised policy, service or budget
change, which affects people (the public or staff), so an Integrated
Impact Assessment (IIA) is not an applicable consideration. 
The Internal Audit work is carried out in accordance with the
appropriate legislation and professional standards. The latter includes
compliance by those within the Internal Audit function with the Code of
Ethics set out in the PSIAS. This is of particular importance and
relevance for the profession of Internal Audit founded as it is on trust
placed in its independent and objective assurance about risk
management, internal control and governance. 
6.5 Additional Report Implications (See Appendix A)
Page 64 of 114

Page 65

APPENDIX A – Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Although this report does not relate directly to the key priorities within
the Single Midlothian Plan to which Midlothian Council and its
Community Planning Partners have made a commitment (Reducing the
gap in economic circumstances; Reducing the gap in learning
outcomes; Reducing the gap in health outcomes; and Reducing the
impact of climate change), good governance is important to enable
Midlothian Council to deliver its key priorities in support of achieving the
Council’s objectives. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working  
Hub and Spoke  
Modern  
Sustainable  
Transformational  
Preventative  
Asset-based  
Continuous Improvement  
One size fits one 
None of the above 
Midlothian Council is committed to creating a great place to grow
supported by the 9 drivers for change. Implementing the 9 drivers for
change in practice is applicable to the Council’s Internal Audit service
provision to assist the Council in achieving its objectives. 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you  
Preventative and Sustainable  
Efficient and Modern  
Innovative and Ambitious 
A.4 Delivering Best Value 
The definition of Internal Auditing within the Public Sector Internal Audit
Standards (PSIAS) is “Internal auditing is an independent, objective
assurance and consulting activity designed to add value and improve
an organisation’s operations. It helps an organisation accomplish its
objectives by bringing a systematic, disciplined approach to evaluate
and improve the effectiveness of risk management, control and
governance processes.” 
Internal Audit is a key element of good governance which is important
to enable Midlothian Council to achieve its objectives. Page 65 of 114

Page 66

Recommendations made by Internal Audit underpin the Council’s own
continuous improvement arrangements to enhance its effectiveness,
thus supporting the delivery of the Council’s best value duties. 
A.5 Involving Communities and Other Stakeholders 
The Chief Audit Executive is accountable to the Audit Committee
which, in fulfilling its governance role, acts as a bridge between
the Council and other stakeholders. The Audit Committee remit
includes “To approve the risk-based internal audit plan, including
internal audit’s resources requirements, the approach to using other
sources of assurance and any work required to place reliance upon
those other sources”. 
The Council Management Team has been consulted on the Internal
Audit resources, risk-based audit approach and the resultant planned
Internal Audit coverage to ensure it will provide assurance on controls
and governance relating to the key risks facing the Council and to
assist them in discharging their roles and responsibilities. 
A.6 Impact on Performance and Outcomes 
Applying the framework of the PSIAS will give the Audit Committee
assurance that the Internal Audit function is compliant with legislative
requirements and current best practice. 
The delivery of the Internal Audit strategy and annual plan assists the
Council in improving its performance and outcomes. 
A.7 Adopting a Preventative Approach 
The PSIAS are applicable from 1 April 2013 (amended 2017) which
means the Internal Audit Service has taken steps to be fully compliant. 
Specific audits within the 2024/25 plan will include assessments on
when a preventative approach can be adopted by the Council. 
A.8 Supporting Sustainable Development 
This report does not relate directly to supporting sustainable
development. Internal Audit is a key element of good governance which
is important to enable Midlothian Council to achieve its objectives
including sustainable outcomes.
Page 66 of 114

Page 67

INTERNAL AUDIT STRATEGY         APPENDIX 1 
1. AIM OF STRATEGY 
1.1. The aim of this strategy is to guide MLC Internal Audit function in delivering a high quality internal audit service
to Midlothian Council (MLC) and Midlothian Health & Social Care Integration Joint Board (MIJB), which is capable of: 
• providing the statutory annual assurance and audit opinion on the adequacy of each organisation’s risk
management, internal control and governance arrangements to the relevant organisation’s senior
management and board/audit committee; 
• carrying out all other objectives contained in Internal Audit’s Charter; and 
• adding value to each organisation by influencing and offering ways to enhance the governance and internal
control environment in alignment to their strategic priorities. 
2. STRATEGY OBJECTIVES 
2.1. The objectives of this strategy are to: 
• Outline the assurance framework which comprises assurances from within the organisation and from
external providers of assurance to improve the organisational understanding of the expectations of Internal
Audit; 
• State how the key themes which are integral to the assurance gathering process across the organisation’s
activities will be covered to inform the annual audit opinion statement; 
• Describe the approach to the development of the risk based Internal Audit annual plan; 
• Set out the relative allocation of Internal Audit resources; 
• Outline how the Internal Audit programme of work will be delivered to add value and will be prioritised to
ensure those areas of greatest risk are covered during the audit year; and 
• Describe the monitoring and reporting of the Internal Audit findings from its work and progress with its
plans to the relevant organisation’s audit committee/board. 
3. ASSURANCE FRAMEWORK 
3.1. It is Management’s responsibility to design and maintain proper risk management, governance and internal
control processes and systems to ensure probity in systems and operations, and mitigation of risks, including the
prevention, detection and resolution of fraud and irregularities. Management is also responsible for checking that
the arrangements and controls are operating effectively and obtaining assurances from internal compliance, risk,
inspection, quality, and control functions. These are known as the first and second lines. Internal Audit, as the third
line, is the review function which will provide independent assurance on the effectiveness of the first and second
lines of assurance, challenge current practices, recommend best practice and improvements to lead to a
strengthening of the control environment and management of risks, thus assisting the organisation in achieving its
objectives. 
3.2. The organisation’s assurance framework is the means by which the relevant organisation’s Senior Management
and Audit Committee/Board ensures that they are properly informed on the risks of not meeting objectives or
delivering appropriate outcomes and that it has adequate assurances on the design and operation of systems in
place to mitigate those risks. 
3.3. The assurance framework comprises assurances from within the organisation (from Management and
compliance functions, and independent and objective assurance from Internal Audit) and from external providers of
assurance. Examples of the latter include the Accounts Commission, External Audit (Audit Scotland for MLC and
MIJB), Education Scotland, Care Inspectorate, Scottish Housing Regulator, and other regulators. 
3.4. The assurances are considered during the annual review of the effectiveness of each organisation’s overall
governance framework carried out by officers of each organisation and supported by Internal Audit. The output is
the Annual Governance Statement which is included within the relevant organisation’s Annual Report and Accounts. 
Page 67 of 114

Page 68

3.5. Where audit assurance is required on services that are delivered jointly by public sector joint working
arrangements which include the organisation as a partner, these assurances will be sought as appropriate from
partners’ Internal Audit service providers and Management. 
4. KEY THEMES INTEGRAL TO INTERNAL AUDIT ASSURANCE 
4.1. Each organisation is responsible for ensuring that its business is conducted in accordance with the law and
proper standards, and that public money is safeguarded and properly accounted for, and used economically,
efficiently and effectively. Fundamentally corporate governance is about the systems and processes, and cultures
and values that are used by the organisation to discharge those responsibilities in a timely, inclusive, open, honest
and accountable manner. This includes: setting the strategic direction, vision, culture and values of the organisation;
effective operation of corporate systems; processes and internal controls; engaging with and, where appropriate,
lead communities; monitoring whether strategic objectives have been achieved and services delivered cost
effectively; and ensuring that appropriate arrangements are in place for the managing risks. 
4.2. The organisation’s statutory financial officer, Section 95 Officer or equivalent, i.e. Chief Financial Officer (MLC)
and Chief Finance Officer (MIJB), is responsible for the proper administration of the organisation’s financial affairs.
Under his/her direction, the organisation’s system of internal financial control is based on a framework of Financial
Regulations (rules and regulations for financial management or administration arrangements linked to other key
financial documents that set out the policy framework, associated strategy, and the more detailed procedures and
guidelines), regular Management Information, administrative procedures (including segregation of duties),
Management Supervision, and a system of Delegation and Accountability. 
4.3. The continued use of and investment in technology to support service delivery, and digital change and
transformation to improve operations is a key part of the vision for each organisation. Arrangements in place are
underpinned by the overarching framework of the ICT security policy designed to ensure that computer systems are
secure, reliable and conform to nationally agreed standards, and by the ICT Strategy linked to Corporate Priorities
designed to support effective and modern service delivery and to meet service objectives. 
5. APPROACH TO PERIODIC PLANNING 
5.1. The Internal Audit Strategy and the Internal Audit Annual Plan 2024/25 have been prepared in conformance
with the Public Sector Internal Audit Standards (PSIAS) to fulfil the requirement to produce the statutory annual
assurance and audit opinion for each organisation. 
5.2. As part of the Internal Audit planning process it was necessary to consider each organisation’s priorities, plans,
strategies, objectives, risks and mitigating controls, and the internal and external assurances provided to determine
the priorities of the Internal Audit activity consistent with the organisation’s goals, as follows: 
• Analysis was undertaken of Internal Audit work during the past 5 years against the Audit Universe, which
has been significantly revised and realigned to reflect the current strategic and operational management
arrangements and approach to service delivery, to ensure appropriate coverage; 
• The Strategic Risk Profile was checked to confirm coverage on key strategic risks, as reliance is placed on the
risk assessments carried out by the Risk Owners taking account of the risk ratings and mitigations; and 
• Account was taken of known external audit and inspection activities to avoid duplication of assurance work. 
5.3. The audit planning process involves consultation with key stakeholders including discussions with Senior
Management of each organisation to capture potential areas of risk and uncertainty more fully. This is of particular
importance during a period of change and transformation as each organisation responds to new legislation or
service delivery arrangements that might affect plans, priorities and resources. 
Page 68 of 114

Page 69

6. ALLOCATION OF INTERNAL AUDIT RESOURCES 
6.1. The Internal Audit staff resource totalling 3.22 FTE comprises Chief Internal Auditor (0.5 FTE), Principal Internal
Auditor (0.72 FTE) and Internal Auditor (2.0 FTE). Each member of the Internal Audit team has a professional internal
audit or accountancy qualification, and has suitable experience, knowledge, skills and competencies (such as the
Code of Ethics set out in PSIAS and the Seven Principles of Public Life) needed to deliver the plan. The Available Days
has been amended to reflect the Internal Audit resources after consideration of estimated annual leave, public
holidays, absence including staff turnover, learning and development, and management and supervision. 
6.2. It is estimated that around 80% of Available Days will be spent on assurance, and legislative and other
compliance activities combined. The Assurance work includes sufficient work across a range and breadth of audit
areas which assure those processes that are currently in place and which Management rely on to deliver services,
and to enable preparation of the required annual audit opinion on the adequacy of the organisation’s control
environment. 
6.3. An estimate of 10% of Available Days will be spent on Other activities in support of the Internal Audit function
meeting its wider objectives as set out in the Internal Audit Charter. 
6.4. An estimate of around 4% of Available Days will be utilised on Consultancy activities which support
Management in delivering innovation, change and transformation. Management seek this value added activity
during this unprecedented period of change for Local Government though this allocation reflects a reasonable
estimate of what is actually deliverable within the boundaries of the role of Internal Audit and the resources
available. 
6.5. It is estimated that around 6% of Available Days will be spent on the provision of Internal Audit services to
Midlothian Health and Social Care Integration Joint Board (MIJB). This reflects MLC’s contribution of support
resources as governance arrangements have changed in response to statutory partnership working for the provision
of health and social care integration. 
7. APPROACH TO DELIVERY OF PROGRAMME OF WORK 
7.1. To facilitate operational delivery, an Internal Audit Programme of Work will be developed which provides an
indication of when work will be scheduled during the year, taking account of discussions with Senior Management
and the availability of Internal Audit resources. 
7.2. For each Assurance audit, in line with recognised good practice, an Audit Assignment detailing the scope,
objectives and timing will be prepared and agreed with the relevant Chief Officer/Head of Service and Manager
prior to commencement of Internal Audit fieldwork. Within assurance work: 
• The organisation’s Local Code of Corporate Governance (MLC/MIJB) will be used by Internal Audit as an
integrated toolkit to test the extent of compliance. 
• End to end reviews of financial management and administration processes will be undertaken by Internal
Audit to test the extent of compliance (as integral part of protecting public finances, safeguarding assets,
and delivering services effectively and sustainably), and substantive testing of transactions including data
analytics will be carried out to ensure completeness and accuracy. 
• The Plans (Financial and Asset Management) to deliver the organisation’s strategies, plans and priorities will
be reviewed against best practice standards. 
• Internal Audit will consider fraud risk and prevention and detection controls, and other appropriate cross-
cutting risks and controls (such as risk management, performance management, community engagement,
equalities, business continuity, and health and safety), highlight examples of effective internal controls, and
share good practice across service areas. 
• The ICT arrangements in place to protect each organisation from attack in relation to data security, integrity
and availability will be tested and ICT Plans will be reviewed to confirm they support delivery of the
organisation’s strategies and priorities. 
Page 69 of 114

Page 70

• National reports that give rise to introducing best practice arrangements or lessons learned from other local
authorities or other public sector bodies will be considered and applied by Internal Audit to influence and
offer ways to enhance governance and internal controls. 
7.3. The Legislative and Other Compliance work will include testing in accordance with the terms of the funders’
service level agreements or legislative requirements, as part of the wider assurance framework. 
7.4. Within Consultancy activities, Internal Audit will add value to the Council as it transforms its service delivery
models, re-designs its business processes, and utilises technology to automate processes by influencing and offering
ways to ensure adequate governance, risk management and internal controls. Internal Audit in its ‘critical friend’
role will provide an independent view and challenge of a sample of programmes and projects, and an objective
assessment of self-evaluation arrangements and improvement that underpin the provision of Best Value. 
7.5. Other work will include: 
• Carrying out Follow-Up to monitor Management’s progress with implementation of Audit recommendations
to: ensure that improvement actions have been timeously and effectively implemented; check that these
have had the desired effect to manage identified risks; and demonstrate continuous improvement in
internal control and governance. To facilitate the Internal Audit follow-up activity, Audit recommendations
will continue to be input to the Ideagen system, the corporate performance management system, to assist
relevant Management in tracking and recording their implementation in a consistent way; 
• Performing potentially high risk Contingency audits, investigations and review of issues highlighted during
the year that may be the result of a weakness in internal controls or that may be requested by Management
or the Audit Committee; and 
• Delivering the Help Desk Facility where Internal Audit guidance and advice is given to Management on
internal controls. 
8. MONITORING THE WORK OF INTERNAL AUDIT 
8.1. The Public Sector Internal Audit Standards (PSIAS) requires periodic reporting on the Internal Audit activity to
the relevant organisation’s Senior Management and Audit Committee/Board. 
8.2. Internal Audit assurance work completed and work in progress, and consultancy and other work for the Council
associated with the delivery of the Plan will be outlined within regular reports to its Audit Committee. Specifically
relating to Internal Audit assurance work, this report will include an Executive Summary of the audit objective, good
practice, findings, recommendations, and audit opinion of assurance for each Final Internal Audit Report issued to
relevant Senior Management in the period. 
8.3. Regular progress updates on implementation by Management of relevant Audit recommendations will be
reported periodically during the year to the relevant organisation’s Senior Management and Audit
Committee/Board. 
8.4. Internal Audit’s compliance with its Strategy, delivery of its risk-based Annual Plan, and outcomes of
assessment(s) against Public Sector Internal Audit Standards (PSIAS) will be considered by the Chief Internal Auditor
on a regular basis and formally reported every six months to the Council’s Corporate Management Team and the
Audit Committee, through a Mid-Term Performance Report and within the Annual Assurance Report. 
8.5. The Internal Audit Annual Assurance Report for each organisation (Midlothian Council and MIJB) to their
respective Senior Management and Audit Committee/Board will provide the statutory annual audit opinion on the
levels of assurance based on Internal Audit findings over the year to inform each organisation’s Annual Governance
Statement. 
8.6. The PSIAS requires an annual Internal Self-Assessment and an External Quality Assessment (EQA) each five years
by appropriately qualified and independent reviewers to assess conformance with the Definition of Internal Auditing
and Standards and the application of the Code of Ethics. The Scottish Local Authorities Chief Internal Auditors Group
(SLACIAG) have implemented a “peer review” framework, in which MLC participates, as a cost effective means of
complying with the EQA requirement. Reporting on outcomes includes a statement on conformance with PSIAS and
the quality assurance and improvement plan (QAIP) to enable an evaluation of the Internal Audit quality
management framework and to identify opportunities for improvement. 
Page 70 of 114

Page 71

Internal Audit Annual Plan 2024/25       Appendix 2
Category Activity Days Commentary
Assurance -
Cyclical
MLC Annual
Assessment of
Internal Control
and Governance
20 Prepare an annual assurance report for
Management and the Audit Committee
summarising the work undertaken by
Internal Audit during the year and forming
an opinion on adequacy of the Council’s
arrangements for risk management,
governance and internal control.
Continuous audit approach on progress
with areas of improvement. Annual
evaluation of compliance with the Local
Code of Corporate Governance covering
the corporate whole and individual
Directorates/Services.
Assurance -
Risk
Midlothian Energy  30 Review the governance structures, ensure
monitoring regimes are in place and
operating to ensure long term delivery of
outcomes for the Council and control over
financial and operational risk.   
Assurance -
Risk
Fostering, Kinship
Care and
Adoption
30 Review the processes in place to operate
the Fostering, Kinship Care and Adoption
processes and ensure that the correct
funding is being allocated appropriately for
each young person.  
Assurance -
Risk
Education
Additional
Support Needs 
30 Review of the processes in place to plan
for and provide services for pupils with
additional support needs across Education
services, meeting the needs of young
people in accordance with regulatory
requirements.  
Assurance -
Risk
Purchase to Pay 30 Review the control process in place
around the Council’s Purchase to Pay
system to ensure that they are operating
effectively and providing assurance that all
expenditure is appropriately processed
through systems and is being correctly
authorised in accordance with the financial
control processes of the Council.  
Assurance -
Risk
Social Work
Children Services
to Adult Services
Transition 
25 Review the processes in place for
transitions from Childrens Social Work
Services to Adult Social Work Services for
clients with ongoing needs, to ensure
efficient and effective transitions are
planned and implemented. 
Assurance -
Risk
Business
Continuity 
20 Review the Business Continuity processes
in place within the Council ensuring that
they cover all key risks, including
Page 71 of 114

Page 72

Category Activity Days Commentary
cybersecurity incidents, power/energy
losses etc.  
Assurance -
Risk
Budget
Monitoring
25 Review the processes in place to ensure
that services and service management are
effectively monitoring and managing
budgets throughout the financial year and
identifying and escalating significant
issues through finance and governance
structures on a timely basis. 
Assurance -
Cyclical
School Funds 25 Review the processes in place to ensure
appropriate management and controls
processes are in place for school funds. 
Assurance -
Cyclical
SEEMIS (School
Information
Management
System). 
20 Review the control process in place to
ensure accurate recording and use of
management information within the
SEEMIS System.  
Assurance -
Cyclical
IT Asset
Management 
20 Review the processes in place to ensure
that IT assets are recorded, managed and
maintained in an effective and efficient
manner.  
Assurance -
Risk
Vehicle
Maintenance and
Fleet
Management
30 Review of the controls, governance and
compliance processes in place to ensure
that Council vehicles are being adequately
maintained in line with regulatory
requirements.  
Assurance -
Risk
Property assets
and property
strategy
20 Review the processes of developing a
property asset management strategy and
the governance of the implementation. 
Consultancy Consultancy  20 In its ‘critical friend’ role provide: an
independent view and challenge of a
sample of programmes and projects
(including Captial Plan and Asset
Management Board, Learning Estate
Strategy, Business Transformation Board,
Information Management Group); and an
objective assessment of self-evaluation
arrangements. 
Other MLC Audit
Committee Self-
Assessment
5 Provide assistance to the Chair in
undertaking a self-assessment of the
Audit Committee against the CIPFA best
practice guidance.
Assurance -
Cyclical
MLC
Recommendation
Follow Up
Reviews
30 Undertake 2 reviews: the first includes a
sample check on the adequacy of new
internal controls for Audit Actions flagged
as closed, and the second assesses
performance against closing Audit Actions
by the agreed due date. 
Page 72 of 114

Page 73

Category Activity Days Commentary
Other Contingency  30 Support / undertake any investigations
and other reactive work to ensure high risk
issues and concerns identified by
Management or Audit Committee during
the year are appropriately addressed.
Other Help Desk
Enquiry system 
22 Provide guidance and advice to
Management and Staff on internal
controls. 
Other MLC
Administration of
Audit Scotland
Reports
5 Monitor publication of Audit Scotland
reports and co-ordinate submission by
Management of Audit Scotland Reports to
the relevant Committee. 
Other Risk Management
Group
15 Attend and provide support to the Risk
Management Group, and the Integrity
Group.
Other MLC Attendance
at Boards /
Committees
20 Prepare for and attend Audit Committee
meetings and other Boards/Committees
as relevant.
Other MLC Audit
Planning for
2024/25
10 Update the Audit Universe, check risk
registers and other sources of assurance,
and develop and consult on proposed
coverage within the Internal Audit Annual
Plan 2024/25.
MIJB
Assurance
Midlothian Health
and Social Care
Integration Joint
Board
40 Audit reviews and support to be
determined and agreed by the Midlothian
Health and Social Care Integration Joint
Board Audit and Risk Committee for
review of the adequacy of the MIJB’s
arrangements for risk management,
governance and internal control for
delegated resources.    
Total Days 2024/25 522 
Page 73 of 114

Page 74

Page 74 of 114

Page 75

Audit Committee
Monday 18 March 2024
Item No 5.6 
Risk Management Update – Strategic Risk Profile Quarter 3 2023/24 
Report by Derek Oliver, Chief Officer Place 
Report for Information 
1 Recommendations 
Audit Committee is recommended to:
• Note the current risk landscape and organisational response to
the most significant risks in Quarter 3 (Q3) 2023/24 (1 October
to 31 December 2023). 
2 Purpose of Report/Executive Summary 
The purpose of this report is to provide Audit Committee with:
• An update on the risk responses Midlothian Council has
implemented during Q3 2023/24 to respond to the current risk
climate
• Assurance that Midlothian Council took a proportionate and
planned approach to prepare and respond to the current risk
climate
• The risk evaluation of current strategic risks and opportunities
for the Council 
08 March 2024 
Report Contact:
Derek Oliver, Chief Officer Place
Derek.Oliver@midlothian.gov.uk 
Page 75 of 114

Page 76

2 
3 Q3 risk management overview 
3.1 Midlothian Council has delivered a wide range of services to the people
of Midlothian throughout Quarter 3 2023/24. 
3.2 The Council continues to manage and review risks recorded within the
Strategic Risk Profile. The work required to maintain the necessary
corporate oversight over the broader strategic landscape continues
through the Risk and Resilience Chief Officer’s group and Corporate
Management Team (CMT). 
3.3 Audit Committee should note that there were no new risks added from
the previous Quarter. Updates on actions taken are included in the full
strategic risk profile (Appendix B). 
Strategic Risk Profile Summary
3.4 The SRP is split into three sections:
• Strategic issues
• Strategic risks
• Opportunities 
STRATEGIC ISSUES - SUMMARY 
Strategic issues Likelihood Impact Score Evaluation Q3 Q2 23/24
COVID 19 1 4 4 Low  Low
The Change Programme 5 5 25 Critical  Critical
Financial Stability 5 5 25 Critical  Critical
National Care Service 3 5 15 Medium  Medium 
COVID-19
3.5 The risk evaluation was reduced from Critical to High in Q1 22/23 and
remained as high through 2022/23. With the recovery of the pandemic,
the likelihood was re-evaluated and considered low in Q4 22/23 and
continues to be low through to Q3 23/24.  The Council continues to
monitor and risk assess as appropriate, with its wider impacts
assessed and controlled through relevant Strategic Risks. 
The Change Programme 
3.6 The Change Programme remained at Critical throughout 22/23 and into
Q1 23/24. The financial challenges of the underlying budget gap pose
a significant challenge for benefits realisation. Council agreed to a
Transformation Blueprint in June 2023 which is a 5-year transformation
plan. 
Page 76 of 114

Page 77

3 
Financial Sustainability 
3.7 The scale of the financial challenge continues to be reported to
Business Transformation Steering Group and Council. 
National Care Service 
3.8 The first stage of the Bill has been delayed and it had been anticipated
that an update would be available around December 2023.  This has
been moved to March 2024. 
STRATEGIC RISKS – SUMMARY 
Strategic Risks Likelihood Impact Score Evaluation Q3 Q2 23/24
Climate change 5 5 25 Critical  Critical
Financial Sustainability in
future years
5 5 25 Critical  Critical
The Long Term Change
Programme
5 5 25 Critical  Critical
Early Years Expansion
(1140 Hours)
4 5 20 High . High
Scottish Child Abuse
Inquiry
4 4 16 High  High
UK decision to leave the
EU
4 5 20 High  High
Growing Council 4 4 16 High  High
Cost of Living Crisis 3 5 15 Medium  Medium
Asset Management 3 5 15 Medium  Medium
Cyber Security 3 5 15 Medium  Medium
Health and Safety 3 5 15 Medium  Medium
Care at Home 3 4 12 Medium  Medium
Employee performance 3 4 12 Medium  Medium
Emergency planning and
business continuity
3 4 12 Medium  Medium
Legal and Regulatory
compliance
3 3 9 Medium  Medium
Governance and standards 2 4 8 Low  Low
Internal control
environment
2 3 6 Low  Low
Corporate policies and
strategies
2 3 6 Low  Low 
Page 77 of 114

Page 78

4 
STRATEGIC RISKS – RATED CRITICAL/HIGH 
Climate Change 
3.13 The Council developed a Climate Change Action Plan as part of its
Climate Change Strategy approved by Council in August 2020, as well
as making the commitment to achieve Carbon Neutral by 2030.  
3.14 A review of the current Climate Change Strategy and Action Plan is
being undertaken and an update will be provided to Council in Q1
2024/25. The risk evaluation continues to remain Critical in Q3. 
Early Years Expansion (1140 hours)
3.17 Following the Scottish Government’s decision to increase the number
of free early learning and childcare hours to 1140, the Council has
continued to plan with its partners. The two key strands to the
successful implementation are the recruitment and training of staff and
the physical increase in estate capacity. These challenges are being
considered in the wider context of the plan, in which the capacity and
expansion of all funded providers (council, private and voluntary
settings as well as childminders) combine to deliver the requirements. 
3.18 This risk evaluation continues to remain High whilst the Council awaits
an update on the funding provision. 
Scottish Child Abuse Inquiry (SCAI)
3.19 The SCAI risk remains High. 
UK decision to leave the EU
3.20 The rate of inflation is impacting on the cost of living crisis for
Midlothian residents and posing significant risk to a number of Council
Capital Programme work streams. This was reported to the Business
Transformation Steering Group (BTSG) and also through progress
reports on programmes to Council.  This risk evaluation remains High. 
Growing Council
3.21 In Q2 22/23 the risk evaluation increased from Medium to High and
remains High in Q3 2023/24. This is in response to the current financial
challenge as described above and the increased pressure the Council
faces with growth. Some current examples of this include:
• Inflationary impact on the delivery of the capital programme
• Cost of living crisis and rent freeze response that could risk the
delivery of the house building programme
• Pressure on the care sector as people are living longer and
require more care provision
Page 78 of 114

Page 79

5 
• General population growth places additional demand on
infrastructure such as GPs, schools, waste services etc.
3.25 Work is ongoing to review the Learning Estate Strategy and a
reprioritisation of the Capital Programme.  
STRATEGIC OPPORTUNITIES 
Shawfair
3.26 The Shawfair development, with its new Rail link provides a major
incentive for house builders, employers, retail and commercial interests
including opportunities to secure a low carbon community through
district heating from Zero Waste. The Energy Services Agreement with
Shawfair LLP has now been signed and work progresses to deliver the
Energy Centre. 
Easter Bush
3.27 Fast growing opportunities in Science, Technology, Engineering and
Mathematics (STEM) with opportunities to link with education.
Partnership links to schools and university sector at the 'Bush' to
promote STEM. The rate of inflation is impacting on the costs of the
A701 improvements which will was reported to Council at the end of
June 2022. A funding application was submitted to the UK
Government’s Levelling Up fund to close the funding gap. 
City Deal
3.28 Edinburgh and South East Scotland City Region Deal - bid for funding
to Scottish and UK Governments to accelerate economic growth
through investment in infrastructure/ housing/ skills and innovation was
agreed by Council in June 2018.  Projects continue to be progressed
with realisation of regional enhancements and connectivity. 
Creating a world class education system
3.29 The Centres of Excellence model is a core part of the Council's
strategy to create a world-class education system in Midlothian. 
Page 79 of 114

Page 80

6 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
There are no direct resource implications indicated in this report,
although, individual risks have associated resource implications. 
4.2 Digital 
None 
4.3 Risk 
The risks reported in this report are understood with the Council able to
demonstrate the current risk controls and actions being taken in
response to these.
The report provides an overview of the significant risks faced by the
Council during Quarter 3 2023/24 and should act to provide assurance
that Midlothian Council took a proportionate and planned approach to
prepare and respond to each of these risks. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
There are no direct equalities issues arising from this report. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Strategic Risk Profile (Quarter 3 2023/24) 
Page 80 of 114

Page 81

7 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
This report provides an overview of the Strategic Risk Profile of
Midlothian Council at a defined point in time. The issues, risks and
opportunities affecting or supporting delivery of the council priorities are
set out within the Strategic Risk Profile. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The Council’s commitment to best value and securing continuous
improvement can best be delivered when decisions are made against a
backdrop of understanding the risks and opportunities before an
organisation. This report seeks to provide assurance that the current
risk environment is understood and that Midlothian Council is taking
appropriate action in response to those identified risks. 
A.5 Involving Communities and Other Stakeholders 
This Strategic Risk Profile report has been compiled with input from a
range of internal key stakeholders. 
Page 81 of 114

Page 82

8 
A.6 Impact on Performance and Outcomes 
This report seeks to provide an overview of the challenging risk
environment within which the Council is operating at this time. Being in
a risk aware position helps to inform current and future decision
making, with the intention of enhancing decision making and the
associated performance and outcomes which flow from well informed
decision making. 
A.7 Adopting a Preventative Approach 
The Risk Management approach being taken by the Council is founded
on a preventative approach to managing risks, where appropriate and
more generally to decision making with far greater risk awareness. 
A.8 Supporting Sustainable Development 
Senior Managers must ensure the sustainability of the Council, which
entails identifying, understanding and managing Strategic and Service
level risks and opportunities.
Page 82 of 114

Page 83

1
STRATEGIC RISK PROFILE, Q3 October - December 2023 
SRP STRATEGIC RISK PROFILE
SRP This risk register captures the main strategic issues, risks and opportunities that are corporate in nature. It identifies the nature of the risks, measures required to control the risks and their evaluation. It also
details what further actions are required to reduce the likelihood and impacts of those risks to more acceptable and manageable levels with timescales.    
Strategic Issues 
SRP.IR.02 The Change Programme 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.IR.02
Risk cause
The pace of transformation strands of
activity, reporting to the Business
Transformation Board, does not secure
service transformation, delivery of
outcomes or benefit realisation. 
Risk event
Delayed progress or non-achievement
of outcomes and benefits. 
Risk effect 
Slow or delayed financial benefits
arising from service redesign, requiring
the adoption of recovery plans or
requiring short term service reductions
which impact on the Council’s ability to
deliver against its priorities.  
Head of Adult and
Social Care; Chief
Officer Corporate
Solutions; Chief
Operating Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health and
Social Care; Chief
Officer Place;
Executive Director
Place; Chief Officer
Young People and
Partnerships
1. Transformation Blueprint agreed at Council June 2023 which is a 5-year
transformation plan. Revised governance for transformation agreed and
revised Terms of Reference in place for the Business Transformation Board to
oversee progress on change programme. 
2. Regular reporting to Council setting out scale of financial challenge ahead
with recurring expenditure for current service delivery projected to exceed
recurring income. 
3. Cross Party Business Transformation Steering Group are given updates on
the progress of the Transformation programme.  
4. Financial monitoring reports and work of the Financial Management
Corporate Management Team evidence continued financial sustainability, in so
far as services are delivered within the overall budget in year.
5 5 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SPR.RA-
02.08
Transformation Blueprint 2023-28
delivery 
Q3 23/24: Regular review and updates to the Business Transformation Board which
meets monthly. Transformation Manager in post and sprints initiated. 
Q2 23/24: Progress as detailed in Q1.  
Q1 23/24: Transformation Blueprint presented to Council in June 2023 and agreed.
Transformation Manager appointed – expected start date Q2 2023/24. Review of BTB
Chief Officer
Corporate
Solutions; Chief
Executive; Chief
Finance Officer;
30 June 2028  20%
Page 83 of 114

Page 84

2
governance complete and closure report produced for BTSG Q2 2023/24.  Chief Officer
Place
SRP.RA.0
2.03
Develop Medium Term Financial
Strategy with greater oversight, clearer
responsibility and accountability.
Q3 23/24: As Q1.  Preparations for MTFS at February Council.
Q2 23/24: As Q1.
Q1 23/24: The projected budget gap through to 2028/29 was presented to BTSG and
contained in the Transformation Blueprint approved by Council. Updated projections
will be presented to BTSG and to Council on a regular basis.  
Chief Executive;
Chief Finance
Officer
27-Feb-2024  0%  
SRP.IR.07 Financial Sustainability 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.IR.07
Risk cause
Scottish Government Grant settlements
fall short of the resources needed to
sustain core services. Core funding
falling short of inflation pressures, pay
awards and demographic pressures
arising from an Increasing ageing
population of over 75’s 
Increasing population of 0-15 age group
and at a time when there are rising
customer expectations. 
Risk event
Transformation activity and the flexibility
available to Councils as part of the
grant settlement does not address
future years projected budget gaps. 
Risk effect 
Inadequate government funding makes
securing balanced budgets challenging.
This in turn erodes the Council’s ability
to deliver services to the community
and potentially means that resources
available fall short of those the Council
assess as required to meet its statutory
obligations. Whilst transformation
activity can help reshape services and
ensure best value in the delivery of
services it is not a solution to continued
erosion of core funding.  
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Chief
Operating Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
Chief Officer
Young People
and Partnerships
1. There is an approved Capital Strategy and Reserves Strategy in place. The
Capital Strategy is being updated in the context of ongoing and significant
infrastructure pressures. 
2. There is an approved budget for 2022/23. Services were delivered within the
totality of that budget and the 2023/24 budget has been approved albeit with
some reliance on one off funding. 
3. There are effective arrangements in place to monitor financial performance
including quarterly reporting to Council with draft reports considered at a
dedicated CMT session each quarter to bring greater focus. 
4. Directorates have budget boards in place to monitor and agree actions for
those items which are identified as needing specific attention or present a risk to
the financial position of services. 
5. Strategic Boards in place and BTB focus and attention on driving
transformation to support future year’s financial sustainability. 
6. Working through COSLA to influence government spending decisions to
influence Scottish Government’s budget allocation to Councils. 
7. Capital Plan and Asset Management Board will scrutinise and challenge
slippage on capital programmes recognising that slippage can have an adverse
impact on financial sustainability and also the delivery on assets required to
support capital growth. 
8. Chief Executive continues to emphasise the need for effective financial control
and underlined the benefit to the organisation of such an approach. Enhanced
monitoring arrangements have been put in place across the Council. 
9. Scottish Governments May 2022 Resource Spending Review provided
planning parameters for term of parliament, albeit these are challenging and
present a real terms reduction in grant funding of circa 7% over the period. 
10. Report to Council 21 February 2023 sets out scale of financial challenge
ahead with recurring expenditure for current service delivery projected to exceed
recurring income. 
11. “Mini Budgets” progressed in 2020/21 and in 2021/22 that removed non-
deliverable legacy savings targets given focus on response to and recovery from
pandemic. 
12. Cross Party Business Transformation Steering Group engaged in
consideration of measures to secure balanced budgets alongside the
5 5 
Page 84 of 114

Page 85

3
development of a Strategic Plan to support decisions about what services,
beyond those which are statutory can be provided.                  
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SPR.RA-
02.09 Transformation Blueprint 2023 to 2028
Q3 23/24: Regular review and updates to the Business Transformation Board which
meets monthly. Transformation Manager in post and sprints initiated. 
Q2 23/24: Progress as detailed in Q1.  
Q1 23/24: Transformation Blueprint presented to Council in June 2023 and agreed.
Transformation Manager appointed – expected start date Q2 2023/24. Review of BTB
governance complete and closure report produced for BTSG Q2 2023/24. 
Chief Executive;
Chief Finance
Officer
30-June-2028  20%
SRP.RA.0
2.03
Develop Medium Term Financial
Strategy with greater oversight, clearer
responsibility and accountability.
Q3 23/24: As Q1.  Preparations for MTFS at February Council.
Q2 23/24: As Q1.
Q1 23/24: The projected budget gap through to 2028/29 was presented to BTSG and
contained in the Transformation Blueprint approved by Council. Updated projections
will be presented to BTSG and to Council on a regular basis.  
Chief Executive;
Chief Finance
Officer
27-Feb-2024  0%
SRP.RA-
02.10 Capital Plan Prioritisation
Q3 23/24: Work continues on CPP.
Q2 23/24: Work continues on CPP.
Q1 23/24: The Capital Plan in its current format is unaffordable due to rising costs of
construction, inflation and EU-Exit/post pandemic and other economic pressures. A
review of the Capital Plan is underway to determine affordability, prioritisation and
options presented to members for consideration in Q2 2023/24.  
Head of
Development;
Chief Finance
Officer;
Executive
Director Place
31-Oct-2023  0%  
SRP.IR.10 COVID 19 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.IR.10
Risk cause 
COVID 19 Virus 
Risk event 
Virus evident in all communities with
rates of positive infection increasing. In
a Sottish setting the focus on increase
is within the central belt. 
Risk effect 
Potential for widespread impacts with
the risk of significant levels of
community transmission leading to
increased government restrictions
aimed at reducing community
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Chief
Operating Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
HR Strategic
1. CIMT established to take the strategic approach to managing the response to
COVID 19 and stands ready to be re-initiated at any time. 
2. Hybrid working has been adopted by the Council as well as a dedicated
Hybrid Working Board as part of the Transformation Programme 
3. COVID-19 guidance monitored and continually revised, with particular focus
on Adult Services, Children’s Services, Education and Communities and Lifelong
Learning around how they would continue to maintain contact with children and
young people who were deemed to be at risk. 
4. Keeping employees briefed and supported through the Chief Executive’s
weekly staff briefings; Communications weekly email and routine HR updates.
(e-mailed to all employees through combination of work and personal e-mail
addresses). Includes Wellbeing advice, guidance and support and signposting to
PAM and EAP providers. 
5. Promotion of digital tools to support employees and prevent employees
becoming isolated. 
1 4 
Page 85 of 114

Page 86

4
transmission. 
Delivery of services making use of
remote working solutions as far as
possible. National lockdown measures
to limit and control spread, impact on
income generating services. 
Rapid pace of guidance changes
following government announcements
and expectation of quick changes to
service delivery in line with new
controls.  
Lead; Chief
Officer Young
People and
Partnerships
6. Council website kept up-to date, providing details of which services were
operating and any changes on how to access services. 
7. A range of interventions, including digital equipment and tools such as MS
Teams put in place to support remote and hybrid working 
8. Following safe working guidance issued by Scottish Government relevant to
sectors. 
9. Economic Recovery Strategy 
10. School and workplace based COVID risk assessments continually reviewed
to support the identification and control of risk (and personal risk assessments
where required)                  
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.1
0.1 Hybrid Working
Q1 23/24: Hybrid Working Programme closed. Closure report presented to Place DMT
and contained within BTB closure report. Workstreams relating to Estate
Rationalisation have moved into Blueprint and continue under the themes of Hub &
Spoke, Capital Plan and One Stop Shops. Project Team and Terms of Reference being
established.  
Chief Officer
Corporate
Solutions; Chief
Digital Officer;
Chief Officer
Place; Executive
Director Place
31-Mar-2024  0%  
SRP.IR.11 National Care Service 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.IR.11
Risk cause
In August 2022 the Scottish
Government launched a 12-week
consultation on the way in which social
care is delivered in Scotland. The
consultation followed recommendations
made in the Independent Review of
Adult Social care. The independent
analysis of responses was published in
February 2022. On 20 June 2022 the
Scottish Parliament published the
National Care Service (NCS) Bill which
will provide the foundation for the NCS. 
Risk event
A Bill passes through various
Head of Adult
and Social Care;
Chief Executive;
Director Health
and Social Care;
Executive
Director Place;
Chief Officer
Young People
and Partnerships
1. The first stage of the Bill has been delayed and it is anticipated that an update
shall be available around December 2023. 
2. Officer Working Group established to engage with the NCS Design School
and to continue the existing work with COSLA, SOLACE, SOLAR and other
relevant bodies 
3. Ongoing briefings with elected members 
4. Continued dialogue and engagement with Scottish Government and
IJB/H&SCP/Children’s Services  
3 5 
Page 86 of 114

Page 87

5
Parliamentary stages. The Bill is
currently in Stage 1 of the process. The
most significant part of the legislation
which poses the most risk is the
intention to transfer social care
responsibility from local authorities to a
new, national service. 
Risk effect 
The details of the logistics of any
transfer are not yet provided within the
Bill. It is not clear the extent to which
powers will be removed from local
authorities or what the provision or
delivery of services will or will not be. 
At this stage, the risk effect is
anticipated to be significant financial
impact to local authorities and IJBs, as
well as the potential for impacts on
staffing, transfer of property and
facilities and the reshaping of the
delivery of care. 
It should be noted that the initial impact
on the Council is staff time to contribute
to the ongoing discussions and
understanding of the impact of the Bill.              
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.1
1.1 Officer Working Group
Q3 23/24: Further information now expected late March 2024.
Q2 23/24: National Care Service Bill has been delayed for any further decision until
the 1st March 2024.
Q1 23/24: Work on the NCS has been delayed and further information will not be
available until around December 2023.  
Chief Executive 31-Mar-2024  100% 
Page 87 of 114

Page 88

6 
Strategic Risks 
SRP.RR.01 Financial Sustainability in future years 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.0
1
Risk cause:
Scottish Government Grant settlements
fall short of the resources needed to
sustain core services. Core funding
falling short of inflation pressures, pay
awards and demographic pressures
arising from an Increasing ageing
population of over 75’s. 
Increasing population of 0-15 age group
and at a time when there are rising
customer expectations. 
Policy decisions by UK & Scottish
Governments which are not fully
funded. 
Changes to the responsibilities of Local
Government and the funding implication
that arise from that, particularly in
respect of the creation of a National
Care Service. 
Future year pay award settlements. 
Risk event: 
Real terms reduction in core grant
settlements. 
Policies decisions at Government level
not fully funded to Council's. 
Implementation of a National Care
Service and impact on grant
settlements 
Securing the extent of change required
in order to deliver financial sustainability
and a change program that recognises
the size of the challenge. 
Cost pressures exceeding budget
estimates. 
Uncertainty around service delivery
models and income streams and
prospects for public finances associated
with COVID impact and recovery. 
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Chief
Operating Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
Chief Officer
Young People
and Partnerships
1. The Strategic Plan, Transformation Blueprint and updated MTFS projections
will all be presented to Council in June 2023. 
2. Maintaining a level of reserves to deal with unforeseen or one-off cost
pressures. 
3. Capital and Reserves Strategies in place. The Capital Strategy is being
updated in the context of ongoing and significant infrastructure pressures. 
4. Working through COSLA to influence government spending decisions to
influence Scottish Government’s budget allocation to Councils. 
5. Implement a lobbying strategy with government to recognise the unique
position Midlothian Council is in. 
6. Best Value Audit report actions. 
7. Strategic Boards in place to drive transformation in line with the
Transformation Blueprint. 
8. Dedicating capacity to understand impact of NCS Bill, but limited details mean
this is challenging and many unanswered questions (refer to specific risk on
NCS for further detail)  
5 5 
Page 88 of 114

Page 89

7
Risk effect: 
Gap in Council budget between budget
commitments / pressures and funding
level and inadequate options presented
to address this, resulting in a structural
deficit. The pace of growth coupled with
the shortfall in grant settlements adds
pressure to Council budgets which will
be unable to deliver capital and revenue
work programmes.                  
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.0
2.03
Develop Medium Term Financial
Strategy with greater oversight, clearer
responsibility and accountability.
Q3 23/24: As Q1.  Preparations for MTFS at February Council.
Q2 23/24: As Q1.
Q1 23/24: The projected budget gap through to 2028/29 was presented to BTSG and
contained in the Transformation Blueprint approved by Council. Updated projections
will be presented to BTSG and to Council on a regular basis.  
Chief Executive;
Chief Finance
Officer
27-Feb-2024  100%
SRP.RA.0
2.04 Transformation Blueprint 2023 to 2028
Q3 23/24: Regular review and updates to the Business Transformation Board which
meets monthly. Transformation Manager in post and sprints initiated. 
Q2 23/24: Progress as detailed in Q1.  
Q1 23/24: Transformation Blueprint presented to Council in June 2023 and agreed.
Transformation Manager appointed – expected start date Q2 2023/24. Review of BTB
governance complete and closure report produced for BTSG Q2 2023/24. 
Chief Executive;
Chief Finance
Officer
30-June-2028  20%
SRP.RA.0
2.06 Capital Plan prioritisation
Q3 23/24: Work continues on CPP.
Q2 23/24: Work continues on CPP.
Q1 23/24: The Capital Plan in its current format is unaffordable due to rising costs of
construction, inflation and EU-Exit/post pandemic and other economic pressures. A
review of the Capital Plan is underway to determine affordability, prioritisation and
options presented to members for consideration in Q2 2023/24.  
Head of
Development;
Chief Finance
Officer;
Executive
Director Place
31-Oct-2023  0%  
SRP.RR.02 The Long-Term Change Programme 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.0
2
Risk cause:
A MTFS that does not address the
projected budget shortfall or contextual
factors relating to the Midlothian area. 
Reduced resources 
Leadership fit for the future. 
Lack of clarity or clear compelling vision
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Chief
Operating Officer
Education; Chief
1. Development of Strategic Plan, Transformation Blueprint and MTFS
projections which come together to provide a framework to effect change and to
move the Council to a position of financial sustainability. 
2. Leadership from all Elected Members, Executive Team and Senior Leadership
Group. 
3. Appropriate governance in place across the BTB Strategic Boards 
4. Resilience planning. 
5 5 
Page 89 of 114

Page 90

8
for the future 
Delay or shortfall in securing savings 
Lack of or not securing transformational
change in service provision 
Risk event:
Delayed progress in applying various
strands of the Change Programme
including Delivering Excellence
Framework 
Slow benefits realisation and budget
savings 
Cuts in service provision rather than
service transformation 
Risk effect:
Objectives of change not actually met. 
Adverse impact on services Slow or
delayed proposals/savings arising from
service redesign. Potentially further
eroding reserves or requiring short term
service reductions which impact on
Council's ability to deliver against its
priorities. Staff morale negatively
affected, Government step-in short term
savings instead of transformation  
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
Chief Officer
Young People
and Partnerships
5. Capacity to deliver change. 
6. Dedicating capacity to understand impact of NCS Bill, but limited details mean
this is challenging and many unanswered questions (refer to new risk on NCS
for further detail)                  
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SPR.IA.02.
06 Transformation Blueprint 2023 - 2028
Q3 23/24: Regular review and updates to the Business Transformation Board which
meets monthly. Transformation Manager in post and sprints initiated. 
Q2 23/24: Progress as detailed in Q1.  
Q1 23/24: Transformation Blueprint presented to Council in June 2023 and agreed.
Transformation Manager appointed – expected start date Q2 2023/24. Review of BTB
governance complete and closure report produced for BTSG Q2 2023/24. 
Chief Officer
Corporate
Solutions; Chief
Executive; Chief
Finance Officer;
Chief Officer
Place
30-June-2028  20%
SRP.RA.0
2.03
Develop Medium Term Financial
Strategy with greater oversight, clearer
responsibility and accountability.
Q3 23/24: As Q1.  Preparations for MTFS at February Council.
Q2 23/24: As Q1.
Q1 23/24: The projected budget gap through to 2028/29 was presented to BTSG and
contained in the Transformation Blueprint approved by Council. Updated projections
will be presented to BTSG and to Council on a regular basis.  
Chief Executive;
Chief Finance
Officer
27-Feb-2024  0%    
Page 90 of 114

Page 91

9      
SRP.RR.03 Legal and Regulatory Compliance 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.0
3
Risk cause
Current or new legislation applying to
Midlothian Council 
Risk event
Council and or Services not identifying
all applicable legislation impacting
Council activities and Service
requirements. 
Risk effect
Council failing to meet its statutory
obligations resulting in a potential
negative impact for service users or
employees. Reputational impact of not
meeting statutory obligations.  
Head of Adult
and Social Care;
Legal and
Governance
Manager; Chief
Officer Corporate
Solutions; Chief
Operating Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
Chief Officer
Young People
and Partnerships
1. Executive Directors, Chief Officer(s) and Head(s) of Service responsible for
identifying applicable legislation and propose Council or Service responses to
CMT and Cabinet/Council as required. 
2. Annual Assurance Statement. 
3. Internal Audit testing of internal controls as part of risk-based audit plan. 
4. External Audit. 
5. Range of external inspection. 
6. BTSG oversight of new legislation 
7. Central repository of applicable legislation.   
3 3 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
NEW Review of policy and creation
of a policy register 
Q3 2023/24: Corporate Solutions has initiated a review of policies in the Council,
aligned to legislation changes and statutory requirements for the Local Authority. Work
is ongoing to gather information across the Council to inform an action plan and a
refreshed policy register. It is estimated that this work will take until end 2024 to be
completed.
Chief Officer
Corporate
Solutions
31 Dec
2024     10%
SRP.RA.0
3.02 Rights of the Child Bill Q3 23/24: As Q2.
Q2 23/24: Bill now adopted. Policy to be presented to Council May/June 2024.
Chief Social
Work Officer
31-Dec-
2023  0%
SRP.RA.0
3.03 National Care Service
Q3 23/24: As Q2.
Q2 23/24: National Care Service Bill has been delayed for any further decision until
the 1st March 2024.
Q1 23/24: The first stage of the Bill has been delayed until December 2023. 
Chief Executive 31-Dec-
2023  0%
Page 91 of 114

Page 92

10
SRP.RA.0
3.05
Review of Standing Orders, Scheme of
Administration and Scheme of
Delegation
Q3 23/24: Workplan being developed by officer working group and will be presented
to SOWG in March 2024 for approval.   
Q2 23/24: Work ongoing.
Q1 23/24: Work ongoing.  
Legal and
Governance
Manager; Chief
Officer
Corporate
Solutions;
Executive
Director Place
31 Dec 2024  20%      
SRP.RR.04 Employee performance 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.0
4
Risk cause
Employees not suitably
trained/developed for the roles required
of them. 
Limited availability of qualified
practitioners in certain sectors. 
Change program not informed by all
key stakeholders. 
Ageing work force.
Employees unclear on expected
behaviours. 
Employees constrained to innovate as a
result of management practice. 
Employee productivity rate below the
required level because of ineffective
use of the People Policies particularly
Maximising Attendance. 
Salaries significantly lower in social
work area in comparison to other LA’s
resulting in recruitment issues
particularly with trying to recruit
experienced staff. 
Risk event
Employees not engaged/consulted as
part of organisational transformation. 
Experienced employees leaving the
organisation.
Inability to recruit suitably qualified /
trained staff to fill vacancies negatively
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Chief
Operating Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
HR Strategic
Lead; Chief
Officer Young
People and
Partnerships
Over-riding risk control measure = Focus on having the right people, here,
healthy, performing, behaving and well led via effective utilisation of the
workforce strategy and accompanying action plan. 
Attendance / Wellbeing
1. Continuing implementation of the Wellness@Midlothian agenda. 
2. Creation of an Employee Health and Wellbeing Strategy and supporting
policy. 
3. Maintaining the Healthy Working Lives Gold Award. 
4. Proactive use of Occupational Health, Midlothian Physiotherapy, Employee
Assistance Programme and the Workplace Chaplaincy Service. 
5. Change of EAP supplier to ensure provision of best possible service. 
6. Development of progressive People Policies. 
7. Roll-out of mental health training for staff and managers. 
Performance
1. Service-level workforce plans. 
2. Structured, robust, well established ‘Making Performance Matter’ Framework
where expected standards of behaviour and Council values are re-enforced. 
3. Continued re-enforcement of all People Policies involving various
communication methods. 
4. Development of a suite of management information to ensure Service
Managers are informed e.g., turnover, absence levels/reasons etc. 
Organisational Change
1. Policy for Organisational Change includes strong emphasis on early
engagement of employees. 
2. Redeployment Procedure to ensure maximum chance of successful
redeployment. 
3 4 
Page 92 of 114

Page 93

11
impacting on remaining workforce. 
Unacceptable behaviours demonstrated
by employees.
Stated organisational culture not
consistently reinforced by managers. 
Poor employee performance will stifle
transformational change.  
Risk effect
Difficulties recruiting the right staff.
Challenges retaining quality staff. 
Low skill levels. 
Low morale, especially during change. 
High absence rates, loss of experience
in service areas. 
‘A Great Place to Grow’ our values
including respect, collaboration, pride
and ownership not realised, potentially
resulting in missing the opportunity to
capitalise on the abilities, experience
and ideas of team members. Poor
employee performance will Exacerbate
the financial challenge.  
Conduct
1. Resolution Policy encourages early intervention of workplace issues. 
2. Professional standards and values build into the induction process and
management development programme. 
Communication
1. A range of initiatives to keep staff informed of change (Chief Executive’s
weekly email, Connect, All staff emails, tailored team briefings etc.                
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.0
2.04
Revisions to Service Workforce Plans -
including analysis of future workforce
requirements, gap analysis and gap
closing strategies, and performance
measures and target setting.
Q3 23/24: As Q1.
Q2 23/24: As Q1.
Q1 23/24: Service plans were presented to June 2023 council. Supporting workforce
plans are due to be fully in place for June 2024. The workforce planning process,
guidance and documentation has been developed and approved for use by managers
across the council. The HR team is available to support managers who wish help and
guidance in the development of these workforce plans.  
HR Strategic
Lead 31-Mar-2024  0%
SRP.RA.0
2.06 Workforce wellbeing
Q3 23/24: This will be delivered in Spring 2024.
Q2 23/24: As Q1.
Q1 23/24: Health and Wellbeing is part of the work ongoing under Theme 2 of the
Blueprint. This work will report further as part of that reporting process, in the latter
half of 2023.  
HR Strategic
Lead 31-Mar-2024  0%  
SRP.RR.07 Care at Home 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
Page 93 of 114

Page 94

12
SRP.RR.0
7
Risk cause
Internal and External providers of Care
at Home services unable to meet
service and quality requirements as a
result of a lack of capacity. 
Risk event
Capacity of Community Support
outstripped by demand. 
Risk effect
There is a risk that patients will have
their discharge delayed because there
is insufficient community supports to
enable timely discharge leading to
deterioration in their health, beds being
blocked and elective operations
potentially being cancelled.  
Head of Adult
and Social Care;
Director Health
and Social Care
1. Care at Home winter assurance plan and business continuity plan complete 
2. Development of Care at Home Service Improvement action plan near
completion 
3. External commissioning complete and ongoing contract monitoring in place 
4. External provider audits complete 
5. Re-established Multi-Agency Quality in Care at Home quarterly review
meetings jointly with East Lothian 
6. Weekly provider meetings in place 
7. Additional locum team members and contracts with agency staff in place 
8. Daily discharge meeting with Multidisciplinary and Multi-agency team planning
to plan and coordinate discharge to ensure care at hone support in place  
3 4 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.0
7.01
Independent review of adult and social
care Q1 23/24: Pause remains in place.  
Head of Adult
and Social Care;
Chief Executive
31-Jan-2024  100%  
SRP.RR.08 Asset Management – buildings, vehicles, roads and Digital assets/networks 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.0
8
Risk cause
Many of the assets the Council own by
their nature are in a position of ongoing
deterioration through their normal use,
e.g., roads - normal wear and tear,
streetlights and vehicles & buildings
used to deliver services. 
Risk event
Many assets will deteriorate under
normal conditions although buildings,
roads and streetlights as an example
can be damaged during more extreme
weather events or as a result of a lack
of maintenance. 
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Head
of Development;
Chief Operating
Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
1. There is provision in place within the capital plan for investment in the asset
base. 
2. Asset register 
3. Condition Survey 
4. Understanding of future asset needs 
5. Asset Strategy: 
. Roads 
. Land 
. Fleet 
. Digital Service Network 
. Digital Service hardware 
6. Capital program - investment in estate. 
7. Ongoing monitoring of properties by: Maintenance Surveyors, Facilities
Management and Property Users. 
8. Established Capital Plan and Asset Management Board and dedicated Asset
3 5 
Page 94 of 114

Page 95

13  
Risk effect
In the case of Roads Services there is a
real risk of increased potholes and
insurance claims, reduced skid
resistance leading to higher accident
potential and building up of higher costs
in the future. In respect of vehicles,
increased breakdowns, service failures,
greater maintenance inevitable, higher
short-term hire costs. In terms of
property, health and safety issues arise,
failure to meet current standards and
higher running costs. There is also the
risk of two-tier accommodation, some
high quality, some low. 
Director Place;
Chief Officer
Young People
and Partnerships
Management Board 
9. Establishment of 7 thematic Estate Safety and Management Groups chaired
by Chief Officer Place 
10. Building Accessibility Strategy                  
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.0
8.02
Plan for appropriate investment in
capital works and remedial
maintenance over the lifespan of each
property asset.
Q3 23/24: Surveyors have now completed the first phase of surveys that were due to
have been completed by March 2024. A further phase will begin in April and run
though until April 2025. 
Q2 23/24: As Q1.
Q1 23/24: Surveyors Thompson Gray have been appointed and are progressing a
schedule of condition surveys over a 2-3 year period. This is currently in hand with
surveys progressing.  
Chief Officer
Place 31-Mar-2024  33%
SRP.RA.0
8.05 Learning Estate Strategy
Q3 23/24: As Q1. Any delay to approval of required projects may impact on the
statutory requirement to provide Education.
Q2 23/24: As Q1.
Q1 23/24: All Priority 1 projects as detailed in the Learning Estate Strategy have
been approved by Council in June 2023, this includes Beeslack HS replacement and
Penicuik HS refurbishment & extension. A number of Projects in the priority 2 tranche
have been progressed to ensure schools to do not experience capacity breaches.  
Head of
Development 31-Mar-2024  0%
SRP.RA.0
8.06 Asset Management systems Q1 23/24: Identified for implementation through Transformation Blueprint and The
Change Programme.  SRP.IR.02.  
Chief Officer
Place 31-Mar-2024  0%        
Page 95 of 114

Page 96

14
SRP.RR.09 Emergency Planning and Business Continuity Management 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.0
9
Risk cause
The Council not preparing or timeously
reviewing Emergency Plans and testing
arrangements to respond to Civil
Contingencies Incidents 
Risk event
There are a wide range of potential
events the Council may be expected to
respond to e.g., Severe weather
incident, Pandemic, Utility disruption
etc. 
Risk effect
Censure through non-compliance with
the Civil Contingencies Act 
Not adequately recovering from the loss
of major accommodation (e.g.,
secondary school, main offices),
computer systems and staff Not able to
respond to a major emergency in the
community Fatal Accident Inquiries  
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Head
of Development;
Chief Operating
Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
Senior Manager
Protective
Services; David
Robertson; Chief
Officer Young
People and
Partnerships
01 – Civil Contingencies Risk Register used to highlight key risks and record
response, 
- Council’s plans developed and maintained in response to identified risks, 
- Risk and Resilience Group support development, peer review and roll out of
plans. 
02 – Establishment based incident response plans in place and maintained
locally. 
03 – Emergency response plan setting out general approach to respond to a
major emergency in-line with key partner organisations. 
04 – As part of the Council’s Emergency response the importance of recording
decisions made and information available at the time is highlighted as this would
be scrutinised in the event of an FAI. 
05 – Care for People Group meeting 6 weekly to continue support for
Communities in response to COVID – 19 to establish and co-ordinate support for
people on a multi-agency basis. 
06 – Care for People Group: Afghan, Ukrainian and UASC support programmes  
3 4 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.0
9.02
Development of Emergency Planning
Improvement Plan
Q3 23/24: Service review of team has commenced.  
Q2 23/24: Service review to commence in Q3.
Q1 23/24: The draft report has been prepared for CMT on Enhancing Organisational
Resilience and Preparedness. This report also addresses progress with business
continuity. A service review of the Health, Safety & Resilience team is scheduled to
commence in Q2 2023/24.   
Chief Officer
Place; Senior
Manager
Protective
Services; David
Robertson
31-Dec-2023  75%
SRP.RA.0
9.03 Business Continuity System
Q3 23/24: System review/upgrade has been considered and it is planned to present a
report to CMT in Q4.   
Q2 23/24: Progress impacted by staff resource, conflicting pressures and pending
service review.
Q1 23/24: Following the loss of officer resource through resignation progress has
slowed. Consideration of the appropriateness of procuring the system upgrade version
will occur in Q2.  
Chief Officer
Place; Senior
Manager
Protective
Services; David
Robertson
31-Mar-2024  25%
Page 96 of 114

Page 97

15  
SRP.RR.10 Governance and Standards in Public Life 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.1
0
Risk cause
Code of conduct for Members and
employees’ actions falling short of
International Standards. 
Risk event
Failure in openness, accountability,
clarity. 
Risk effect
Service, partnerships and project
outcomes not achieved. Non-
compliance with conduct standards and
reduction in standards in public life.  
Legal and
Governance
Manager; Chief
Officer Corporate
Solutions; Chief
Executive; Chief
Officer Place;
Executive
Director Place
01 Annual Assurance Statement. 
02 Standing Orders 
03 Scheme of Administration 
04 Scheme of Delegation  
05 Elected Member Code of Conduct 
06 Induction programme for new members and ongoing learning and
development programme 
07 Employee Code of Conduct
2 4 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
NEW Review of the employee onboarding
and induction programme
Q3 2023/24: CMT agreed to a refresh of the staff induction programme which include
a compliance section. It is anticipated that the new programme will be fully completed
by end Dec 2024, with a phasing of improvement actions being delivered throughout
2024.    
SRP.RA.0
3.05
Review of Standing Orders, Scheme of
Administration and Scheme of
Delegation
Q3 23/24: Workplan being developed by officer working group and will be presented
to SOWG in March 2024 for approval.   
Q2 23/24: Work ongoing.
Q1 23/24: Work ongoing.  
Legal and
Governance
Manager; Chief
Officer
Corporate
Solutions;
Executive
Director Place
31 Dec 2024  20%
SRP.RR.1
0.01 Corporate Governance Q1 23/24: Annual Assurance Statement presented to Audit Committee in June 2023
and agreed.  Completed
Legal and
Governance
Manager; Chief
Officer Corp
Solutions;
Executive
Director Place
31-Mar-2024  100% 
Page 97 of 114

Page 98

16
SRP.RR.11 Corporate Policies and Strategies 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.1
1
Risk cause
Policies may not match the aspirations
of the Council's Strategic priorities or
cultural perspective. 
Risk event
Policies not monitored may become out
of date. 
Policies not reviewed to ensure
alignment with strategic priorities. 
Risk effect
Policies not monitored could result in
non-compliance with legislation Policies
not aligned to strategic priorities will
inhibit rather than support
implementation of strategic priorities.  
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Chief
Operating Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
Chief Officer
Young People
and Partnerships
1. Single Midlothian Plan providing overarching direction 
2. Service plans aligned to Single Midlothian Plan. 
3. Leadership team to ensure correct approaches are adopted to get the right
results. 
4. Strategic housing investment plan, submitted to Scottish Government in
October 2022 
5. Capital Strategy 
6. Integrated Joint Board (IJB) Plan 
7. IJB Strategic needs assessment 
8. Midlothian Local Development Plan 2017 – the Council’s corporate spatial
strategy.  
2 3 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.1
1.02 Accessibility Strategy Q1 23/24: Education accessibility strategy updated.  
Chief Operating
Officer
Education; Chief
Officer Place;
Senior Manager
Property and
Facilities
Management
31-Oct-2023  100%
NEW Review of policy and creation of a
policy register 
Q3 2023/24: Corporate Solutions has initiated a review of policies in the Council, aligned to
legislation changes and statutory requirements for the Local Authority. Work is ongoing to gather
information across the Council to inform an action plan and a refreshed policy register. It is
estimated that this work will take until end 2024 to be completed.
Chief Officer
Corporate
Solutions
31 Dec 2024     10%       
SRP.RA.1
1.05 Antisocial Behaviour Policy Q3 22/23: Work continues.   Chief Officer
Place 31-Dec-2023  0%
SRP.RA.1
1.06 Transformation Blueprint 2023 - 2027
Q3 23/24: Regular review and updates to the Business Transformation Board which
meets monthly. Transformation Manager in post and sprints initiated. 
Q2 23/24: Progress as detailed in Q1.  
Chief Executive;
Chief Finance
Officer
30-June-2028  20%
Page 98 of 114

Page 99

17
Q1 23/24: Transformation Blueprint presented to Council in June 2023 and agreed.
Transformation Manager appointed – expected start date Q2 2023/24. Review of BTB
governance complete and closure report produced for BTSG Q2 2023/24. 
SRP.RR.1
1.01 Parental Engagement Strategy Q2 23/24: Policy implemented.
Q1 23/24: Draft Parental Involvement & Engagement Policy at consultation.  
Chief Operating
Officer
Education
31-Oct-2023  100%  
SRP.RR.12 Internal Control Environment 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.1
2
Risk cause
Work procedures/process inadvertently
create the capacity for fraud and waste
to occur. 
Internal Controls requiring more time,
effort or cost than the risk being
managed. 
Mangers failing to follow procedures
and keep systems updated with
accurate information. 
Risk event
Persons exploiting opportunities to
commit fraud. 
Waste and errors 
Changing risk landscape associated
with remote working solutions. 
Risk effect
Waste and loss 
Risks over managed with risk controls
costing more than the potential loss
being managed. 
Increased opportunity for fraud or
financial loss has direct impact on
management information. Has adverse
effect on service performance.  
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Chief
Operating Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
Chief Officer
Young People
and Partnerships
1. Services have been prompted to consider fraud and waste within Service Risk
Registers. 
2. Risk Management Guide provides direction on the need to balance time, effort
and cost against benefit of risk controls. 
3. Internal Audit examine internal control arrangements based largely on the risk
registers.
4. Corporate Fraud team in place who assist managers to undertake fraud risk
assessments in their areas (focused on priority areas) and provide advice and
guidance on fraud related matters. Active participation in the National Fraud
Initiative to investigate matches. 5. Whistleblowing Policy and Counter Fraud
Policy in place (subject to review) with whistleblowing channels available to
report concerns (anonymously if required).  
6. Internal and external assurance. Annual Governance Statement which
involves obtaining assurance from Management over controls in their Service.  
7. E-learning for staff to complete mandatory training for fraud awareness. 
8.  Regular updates to Audit committee on progress with recommendations
made by Internal Audit. 
9. Remind staff to declare secondary employment/outside interests and gifts &
hospitality 
10. Induction for all new employees (with service exceptions), including legal,
HR, procurement, health and safety. Control at entry to organisation. 
11. The Integrity Group continues to meet to improve the Council’s resilience to
fraud, corruption, theft and crime (including cybercrime), maintaining proper risk
management, governance and internal control processes and systems to ensure
probity in systems and operations, and mitigation of risks, including the
prevention, detection and resolution of fraud and irregularities. Management is
also responsible for checking that the arrangements and controls are operating
effectively and obtaining assurances from internal compliance, risk, inspection,
quality, and control functions.  
2 3 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
Page 99 of 114

Page 100

18
SRP.RA.1
2.04
Review of Serious Organised Crime
(SOC) group
Q3 23/24: Work underway to refresh SOC Strategy, working with Police Scotland and
neighbouring authorities.  Draft report expected Q4.
Chief Officer
Place; Health,
Safety &
Resilience
Manager
31-Mar-2024  50%        
SRP.RR.13 Climate Change 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.1
3
Risk cause
Council Services not adequately
engaged, resourced or directed to fulfil
the requirements of the Climate Change
Act. 
Risk event
Council Services not responding to the
Climate Change Act with sufficient
pace. 
Risk effect 
Council failing to meet its obligation
under the Climate Change (Scotland)
Act 2009 and incurring the associated
reputational damage.  
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Chief
Operating Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Planning,
Sustainable
Growth and
Investment
Manager; Chief
Officer Place;
Executive
Director Place;
Chief Officer
Young People
and Partnerships
1. Statutory requirement to report on compliance with climate change duties. 
2. Council Carbon Management Plan 
3. Approval of a Corporate Climate Change Strategy and action plan 
4. CPP Board for Climate Change to bring strategic focus and oversight of plans
and progress. 
5. Resilience Seminars  
5 5 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.1
3.03 Recruitment of Climate Change Officer
Q3 23/24: Recruitment process commenced.  Climate Action Plan work to be
presented to Council in Q1 24/25.
Q1 23/24: Service Review continues.   
Planning,
Sustainable
Growth and
Investment
31-Mar-2024  60%
Page 100 of 114

Page 101

19
Manager; Chief
Officer Place
SRP.RA.1
3.04
Delivery of the BTB Board Carbon
Neutral by 2030
Q4 22/23: This action will be progressed when the Council’s adopted Climate Change
Strategy is reviewed in 2023/24.  
Planning,
Sustainable
Growth and
Investment
Manager; Chief
Officer Place
31-Mar-2030  10%
SRP.RA.1
3.05
Development of the Strategic Plan
2023-27
Q4 22/23: Carbon Neutral by 2030 is a strategic priority, with work continuing
through 23/24.  
Planning,
Sustainable
Growth and
Investment
Manager; Chief
Officer Place
31-Mar-2024  10%  
SRP.RR.14.1 Scottish Child Abuse Inquiry 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.1
4.1
Risk Cause: Midlothian Council and its
legacy organisations, predating the
creation of Midlothian Council in 1996,
have been involved in the provision of
care of children going back to living
memory. During this time there is the
likelihood that the care children
received fell below standards of care
now in place. There is the further
potential that some people in the care
of Midlothian Council and its legacy
organisations were subject to abuse by
those who were employed to care for
them. 
Risk Event: The Scottish Government
began an Inquiry into cases of Child
Abuse occurring prior to 17 December
2014, the intention of this enquiry is to
identify historic case of abuse which
have to date gone unreported. 
The most recent Section 21 notice
around the Foster Care Case Study is a
significant piece of work. The request
for information from 1930 to date is very
challenging given the volume of files
Chief Executive;
Chief Social
Work Officer
The Council have set up an Abuse Inquiry Project Team to support the Council
to prepare for information requests to support the Inquiry. 
In addition, we have a Claims Project Team who have mapped out how we shall
manage any future claims reported against the Local Authority. 
The Inquiry Team have established a Project Plan covering: 
1. Residential establishments, List D Schools and Foster Carers: identifying
Children’s homes, Foster Carers and any List D Schools in Midlothian over the
last 100 years and researching historic records. 
2. Record Audit: reviewing the Council’s existing paper and electronic
recordkeeping systems to identify relevant records and map them to residential
establishments. This also includes, where possible, noting the Council’s historic
recordkeeping policies, such as retention schedules. 
3. Cataloguing/Indexing: checking and updating existing recordkeeping systems
for accuracy and consistency, enabling effective information retrieval when
requested by the Inquiry. 
The Project Team have established a Project Plan covering: 
4. Ascertaining the succession and insurance position in relation to potential
historic child abuse claims. 
5. Ascertaining and agreeing Midlothian Council’s legal position/ approach in
dealing with the potential historic child abuse claims. 
6. Identifying the need for guidance, protocol, templates etc. should/if any claims
be made against the council. 
7. Consideration to identifying if additional staffing will be required as expected
deluge of FOI’s SARs in 2018 from solicitors of potential claimants. 
8. Project team is in place with project plan with a range of identified actions
4 4 
Page 101 of 114

Page 102

20
that require to be read and analysed. 
Risk Effect: If the inquiry finds historic
cases of abuse in Midlothian this could
damage the reputation of the Council
and could place doubt in the eyes of the
public as to the safety of these currently
in care. There is significant scope for a
substantial financial impact arising from
claims of historic abuse. Some existing
employees may be affected by the
inquiry and subsequent claims of
abuse. 
We have requested an extension for
Parts B, C & D of the last Section 21 to
April 2020, which has been granted. 
To date there has been no evidence
from the extensive file read to suggest
there has been systemic abuse within
our foster care system.  
which are being progressed. Monthly meetings to progress project plan. 
9. The SCAI Social Worker is very competent and experienced in this area of
work and provides quarterly updates on their findings from the file read. This is a
real strength within this area of work. The CSWO and Principal Solicitor meet
regularly with the social worker to discuss findings from the file read.                  
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.1
4.03
Foster Care and Residential Care File
Review
Q3 23/24: Inquiry has heard all the evidence for the Sect 21 
Q2 23/24: As Q1.
Q1 23/24: Review complete submissions around foster care. We continue to await the
findings by Lady Smith. The redress system is in place and there is a lot of activity
around this area of work which requires significant input from our social worker within
the Scottish Child Abuse team.  
Childrens
Services
Management
Team; Chief
Social Work
Officer; Chief
Officer Young
People and
Partnerships
31-Mar-2024  100%  
SRP.RR.16 Growing Council 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.1
6
Risk cause
Population growth in Midlothian over
the next 10 to 15 years will see
Midlothian become the fastest growing
Council in Scotland.
Between 2014 and 2039, ages 0-15yrs,
Head of Adult
and Social Care;
Director of
Education; Chief
Executive;
Executive
1. Local development plan and supplementary guidance on developer
contributions. 
2. Services planning future service provision on the basis of anticipated service
demands 
3. The change programme 
4. Learning Estate Strategy 
4 4 
Page 102 of 114

Page 103

21
population is projected to increase by
20% and for ages 75+ population
projected to increase by 100%. 
Risk event 
Failure to resource and plan for these
rises will significantly impact the
Councils ability to fulfil its statutory
obligations in relation to these groups. 
Risk effect 
Inadequate capacity within the school
estate to cope with the projected
increase in pupil numbers. In sufficient
provision to support an aging population
placing costly inefficiencies on other
parts of the care sector. General
population increase placing additional
demand on infrastructure including GP
services. Increased pressure on
infrastructure, services e.g., waste
collection and growth of road network
as new development roads are
adopted.  
Director Place;
Chief Officer
Young People
and Partnerships
5. Capital Plan Prioritisation 
6. Strategic Housing Investment Strategy 
7. Rent Review Strategy 
8. Joint needs assessment used to develop - IJB Strategic Plan 
9. Capital Plan and Asset Management Board will scrutinise and challenge
slippage on capital programmes recognising that slippage can have an adverse
impact on financial sustainability and also the delivery on assets required to
support capital growth. 
10. City Deal provides the opportunity to support inclusive growth.                  
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.1
6.01 Capital Programme
Q3 23/24: The Capital Plan in its current format is unaffordable due to rising costs of
construction, inflation and EU-Exit/post pandemic and other economic pressures. A
review of the Capital Plan is underway to determine affordability, prioritisation and
options presented to members.  
Director of
Education;
Executive
Director Place
31-Mar-2024  75%
SRP.RA.1
6.02 Capital Plan prioritisation
Q3 23/24: Work continues on CPP.
Q2 23/24: Work continues on CPP.
Q1 23/24: The Capital Plan in its current format is unaffordable due to rising costs of
construction, inflation and EU-Exit/post pandemic and other economic pressures. A
review of the Capital Plan is underway to determine affordability, prioritisation and
options presented to members for consideration in Q2 2023/24.  
Head of
Development;
Chief Finance
Officer;
Executive
Director Place
31-Oct-2023  0%  
SRP.RR.17 UK Decision to leave the EU 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
Page 103 of 114

Page 104

22
SRP.RR.1
7
Risk cause
UK vote to leave the European Union 
Risk event
UK leaving the European Union 
Risk effect 
The impacts associated with the UK's
decision to leave the UK have yet to be
realised and will only become clear
once the final terms of the UK's
departure are finalised. There are some
direct potential impacts such as an end
to EU funding of Council co-ordinated
projects and indirect impacts on
industries undertaken within the
geographical area which have relied on
EU funding, such as agriculture. There
are wider potential implications arising
from uncertainty regarding the resident
status of EU nationals, post any exit
agreement, and the availability of
workers from outside the UK accessing
the job market here in the future. These
factors have the potential to impact on
the availability of the right people with
the right skills being available to help
grow the economy here in Midlothian.
One area this could affect the Council
could be in the delivery of future
building projects within Midlothian which
could curtail further economic growth.  
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Chief
Operating Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
Chief Officer
Young People
and Partnerships
01 – Risk and Resilience Group 
02 – Taking a risk management approach to identifying and assessing
anticipated impacts 
03 – Working with a range of national and local bodies to inform preparatory
arrangements. 
04 – EU Settlement scheme promoted on Council Internet to support those living
and working in Midlothian to access the Home Office scheme.  
4 5 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.1
7.01 Refresh of Economic Strategy Q3 23/24: Draft Economic Strategy prepared; to be presented to Council in Q1
24/25. 
Chief Officer
Place 30-June-2024  60%  
SRP.RR.19 Health & Safety 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.1
9
Risk cause
Failing to identify and rectify non-
Head of Adult
and Social Care;
1 - Health Safety and Wellbeing Strategy & Service Plan 
2 - Suite of Health and Safety Management Arrangements developed setting out 3 5 
Page 104 of 114

Page 105

23
compliance with Health and Safety
regulations. 
Risk event
Employees required to undertake tasks
they are not competent to. 
Statutorily driven health and safety
protective arrangements for service
users and employees not implemented
correctly. 
Non-compliance with policy and
procedure 
Not undertaking audits and inspections
to confirm adherence to policy and
legislative requirements. 
Risk effect 
Serious injury of ill health impact on
employees and or service users. 
Negative impact on outcomes for
customers/service users. 
Service users and employees exposed
to hazards where statutory
requirements exist. 
Statutory health and safety - duty of
care over services users and
employees not met. 
Criminal prosecution of the Corporate
body and or individuals through
Corporate Homicide (Corporate
Manslaughter) Significant financial
penalties from Criminal Prosecution.  
Chief Officer
Corporate
Solutions; Chief
Operating Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
Senior Manager
Protective
Services; David
Robertson; Chief
Officer Young
People and
Partnerships
council response to statutory obligations
3 - Comprehensive range of Health & Safety Management & Assessment based
development opportunities for line managers 
4 - Use of Health & Safety Management Information System (SPHERA) to
enhance information transfer and organisational efficiency 
5 - Comprehensive training programme in place to support those with
responsibility for managing health and safety.
7 - Use of comprehensive audit programme to confirm the application of agreed
management Arrangements and Council Policy. 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.1
9.01
Delivery of Health, Safety and
Wellbeing Service Plan
Q3 23/24: Work continues.
Q2 23/23: As Q1.
Q1 23/24: Implementation of the 23/24 Protective Services Health, Safety &
Resilience Service Plan has commenced. Note the Health Safety & Resilience Team
Service Review is scheduled to commence in Q2.  
Chief Officer
Place; Senior
Manager
Protective
Services; David
Robertson
31-Mar-
2024  25%
SRP.RA.1
9.07 H&S audit across all Council estate
Q3 23/24: Work continues.  
Q2 23/24: Work on audit report underway.  Change to SFRS response incorporated
into Fire Action Plans and Management Arrangements.
Chief Officer
Place; Senior
Manager
31-Mar-
2024  75%
Page 105 of 114

Page 106

24
Q1 23/24: Zurich Insurance high level audit of H&S scheduled for July 2023.
Recommendations will be implemented where necessary.  
Protective
Services; David
Robertson           
SRP.RR.20 Early Years Expansion (1140 Hours) 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.2
0
Risk cause
Population growth in Midlothian over
the next 10 to 15 years will see
Midlothian become the fastest growing
Council in Scotland. Between 2014 and
2039, ages 0-15yrs, population is
projected to increase by 20%
In addition, the Scottish Government
has made a commitment to increase
the current provision of free early years
care from 0600 to 1140 hours. 
Risk event 
Failure to resource and plan for these
rises will significantly impact the
Councils ability to fulfil its statutory
obligations in relation to these groups. 
The sustainable rate review may lead to
significant increase in funding to
providers; maintaining current rate is
not an option if not deemed sustainable.
The result could lead to a funding gap
in future years. 
Risk effect 
Inadequate capacity within the school
estate and/or Early Years to cope with
the projected increase in numbers. Lack
of staffing and/or financial support to
build new schools. Potential for
Chief Executive;
Chief Finance
Officer; Executive
Director Place
1. Learning Estate Strategy 
2. Early Years Expansion to 1140 hours updates 
3. Capital Strategy 
4. School Roll Projections will be reviewed and updated 
5. Business Support and Finance Business Partners reviewing external funding
landscape closely for future funding options  
4 5 
Page 106 of 114

Page 107

25
additional unfunded request to place 4-
year-olds with August to December
birthdays requesting additional year of
1140 hours, not currently funded by
Scottish Government.                  
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RR.2
0.01 1140 future years funding Q1 23/24: Draft guidance from SG. Enhanced guidance due re sustainable rate but no
additional funding for LAs.  
Young P & P, Exec
Director Children;
Chief Finance Off
31-Aug-
2023  0% 
SRP.RR.21 Cyber Security 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.2
1
Risk Cause
Malicious attempts to damage, disrupt
or gain unauthorised access to Council
computer systems, networks or
devices. 
Risk Event
The Council is at significant risk of
cyber-attack from Ransomware
Phishing Emails, Advanced Persistent
Threats (APT) and Distributed Denial of
Service Attacks (DDOS) attacks.
Hacking and Social Engineering. 
Risk Effect
Access to Council systems by cyber
criminals and foreign intelligence
agencies for financial, commercial or
information gathering reasons. This
could lead to significant financial losses,
data compromise and subsequent
regulatory sanction if our technical and
organisational measures are deemed
insufficient. 
Severe business disruption including
the almost total loss of critical IT
systems and networks leading to
significant service delivery challenges.  
Head of Adult
and Social Care;
Cyber Security
Information
Governance and
Compliance
Manager; Chief
Officer Corporate
Solutions; Head
of Development;
Chief Operating
Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
Senior Manager
Protective
Services; David
Robertson; Chief
Officer Young
People and
Partnerships
1. Implementation of and compliance with the Scottish Government Cyber
Resiliency Public Sector Action Plan 
2. Cyber Essentials Plus Certification 
3. Public Sector Network Certification 
4. Appropriate technical and organisational measures deployed to reduce the
likelihood and impact of an attack 
5. Having adequate skills and knowledge in the organisation  
6. Implementing Scottish Government Cyber Security Action Plan 
7. Creating a Midlothian Cyber Defence Action Plan. 
8. Adoption of the NCSC (National Cyber Security Centre) Active Cyber Defence
programme  
3 5 
Page 107 of 114

Page 108

26                
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.2
1.1
Appropriate Technical and
Organisational Measures
Q3 23/24: Action/mitigation includes: -
1. Updated cyber incident response plans.
2. Cyber security presentations to Elected Members and Place directorate. 
3. Conducted phishing exercises.
4. Successfully responded to 13 cyber security events. 
Provided significant Information Governance and Security advice for the deployment of
M365 and Google Workspace 
Q1 23/24: Action/mitigation includes:- 
1. Achieved Cyber Essentials Plus Certification 
2. Preparations completed for Q2 2023/2024 PSN Certification, including submission to
Cabinet Office. 
3. Provided significant Information Governance and Security advice for the deployment
of M365 and Google Workspace 
4. Responded to numerous threat alerts to ensure the security of the Council’s network 
5. Engaged with Cyber Incident Response company to review the Councils Cyber
Incident response capability in Q2   
5. 
Cyber Security
Information
Governance and
Compliance
Manager; Chief
Digital Officer
31-Mar-
2024  0%     
SRP.RR.22 Cost of Living Crisis 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.2
2
Risk cause
The UK is currently facing an
unprecedented storm of increasing
prices, bills and tax. The 40-year high
inflation rate of 9% is the main driver of
the cost of living crisis which has
outstripped wage and benefit increases. 
Risk event
Rapid ongoing rise of energy prices as
well as food and drink prices. 
Risk effect 
Chief Executive;
Director Health
and Social Care;
Executive
Director Place
1. Council Cost of Living Task Force to oversee the Council’s response to the
crisis 
2. Allocation of LACER funding to support those most affected 
3. Strategic Evaluation Partner appointed to create poverty profile 
4. Community Planning Partnership has established a Midlothian Strategic
Poverty Prevention Group co-chaired by Council Leader and Director of Public
Health 
5. New Child Poverty chair and lead appointed (Executive Director Children,
Young People and Partnerships) 
6. Child Poverty self-evaluation underway with Improvement Service  
3 5 
Page 108 of 114

Page 109

27
The impact on households is already
being noted with 87% of adults in the
UK reported an increase in their cost of
living in April 2022 (Office for National
Statistics; Francis-Devine et al,
2022). The price rises will impact low-
income households the hardest as a
larger proportion of their bills are on
energy and food. The Resolution
Foundation estimates an extra 1.3
million people will fall into absolute
poverty in 2023, including 500,000
children.  
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA.2
2.1 Cost of Living Task Force Q1 23/24: Meetings continuing.   Chief Executive 31-Mar-
2024 100%
SRP.RA.2
2.2 LACER funding
Q2 22/23: Identification of 15 trusted partners to distribute funding in communities
for food and fuel, wash and dry provision and support to establish reheatable food
initiatives. 
Lifelong Learning
and Employability
31-Mar-
2023 100%
Page 109 of 114

Page 110

28 
Strategic Opportunities 
SRP.OP.01 Shawfair 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.OP.0
1
The delivery of a new sustainable low
carbon community at Shawfair.  
Head of Adult
and Social Care;
Chief Executive;
Director Health
and Social Care;
Planning,
Sustainable
Growth and
Investment
Manager; Chief
Officer Place;
Executive
Director Place;
Chief Officer
Young People
and Partnerships
1. Shawfair Landowners Group meets quarterly. 
2. Legal agreement with developers to secure developer contributions (Section
75) towards infrastructure. 
3. Approved masterplan and design guide for the entire community 
4. Business and industrial provision, including small business incubator space. 
5. Circa 4000 new homes 
6. A school campus comprising Early Years, Nursery, Primary, Secondary & Life
Long Learning provision 
7. New Primary schools 
8. Public Transport infrastructure including railway station. 
9. Midlothian Energy Ltd (Joint Venture between MLC and Vattenfall)  
5 4 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status           
SRP.OP.02 Borders Rail 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.OP.0
2
Passenger numbers after three years of
operation are above projections. The
railway has been, and continues to be a
catalyst for economic development,
access to training and labour markets,
tourism growth, environmental
improvements must notably in town
centres, and access to the countryside.  
Chief Executive;
Chief Officer
Place; Executive
Director Place
1. Monitored by Economic development. 
2. Maximising the Impact: A blueprint for the Future - published by the blueprint
group involving Scottish Government, Scottish Borders, Midlothian and City of
Edinburgh Council, Transport Scotland, Scottish Enterprise and Visit Scotland.
The document sets out the ambitions of the partners to realise the full potential
of the new Railway. 
3. Timely submission of bids for approval by the Blueprint Group 
4. Close monitoring of approved funded projects. 
5. Borders rail subgroup Chaired by Midlothian Council Chief Executive.  
5 4 
Page 110 of 114

Page 111

29
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status           
SRP.OP.03 Easter Bush - Penicuik 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.OP.0
3
One of Midlothian’s largest and most
significant employment areas. Fast
Growing opportunities in Science
Technology Engineering and
Mathematics (STEM) with opportunities
to link with education. Partnership links
to schools and university sector at the
'Bush' to promote STEM. 
Need to secure long-term strategic road
access to ensure continued growth.  
Head of
Development;
Chief Executive;
Director Health
and Social Care;
Executive
Director Place
1. Planning in place around creating Secondary Schools as centres for
excellence linked to specialisms including Science Technology Engineering and
Mathematics (STEM). 
2. Land allocated for expansion. 
3. Midlothian Science Zone. 
4. City Deal funding to provide for growth and strategic road access.  
5 4 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.OP.0
3.A2 A701/A702 Trunk Road Improvements
Q4 22/23: The funding gap associated with this project is estimated to be £33.2m.
Midlothian Council submitted an application to the UKG Levelling Up Fund (LUF) to
attract alternative funding into the project to close this gap. The application was
unsuccessful. Alternative funding opportunities and means to phase and prioritise the
programme are currently under consideration. A revision to alignments due to landfill
avoidance and required increase in roundabout sizes at Bush Loan and the A702 Spur
Road junctions was made to the specimen design. This is progressing with the target
of submitting a planning application Q1 2024.  
Executive
Director Place 31-Mar-2023  0%  
SRP.OP.04 City Deal 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.OP.0
4
South East Scotland Region City Deal -
a bid for funding to Scottish and UK
Governments to accelerate economic
growth through investment in
infrastructure/ housing/ skills and
innovation. 200 Council Houses linked
to the City Deal.  
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Chief
Operating Officer
Education; Chief
1. City Deal signed in August 2018. 
2. Maintain strong Midlothian involvement through the City Deal governance
structure. 
3. Midlothian City Deal Key Officer (Internal) Group. 
4. Securing best arrangements for Midlothian through close liaison with partners
and conclusion of business cases.  
4 5 
Page 111 of 114

Page 112

30
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
Chief Officer
Young People
and Partnerships                
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.OP.0
4.02
Realisation of outcomes of respective
workstreams
Q3 23/24: Work continues on the relevant programmes.
Q2 23/24: Work continues on the relevant programmes.
Q1 23/24: Work continues on the relevant programmes.  
Executive
Director Place 31-Mar-2024  10%   
SRP.OP.07 Creating a World Class Education System 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.OP.0
7
The Centres of Excellence model is a
core part of the Council's strategy to
create a world-class education system
in Midlothian. This is an ambitious
project designed to deliver excellence
and equity with a particular emphasis
on interrupting the cycle of poverty. 
Risk event
The Phase 2 Equipped for Learning
plan has a strong focus on transforming
classroom practice and learner
outcomes. This can only be achieved if
effective technical support for EfL is in
place to support this change. 
Risk Effect
Without the technical support and
appropriate infrastructure we will not
achieve the change resulting in a
negative impact on learners
experiences and outcomes.  
Head of Adult
and Social Care;
Chief Officer
Corporate
Solutions; Head
of Development;
Chief Operating
Officer
Education; Chief
Executive; Chief
Finance Officer;
Director Health
and Social Care;
Chief Officer
Place; Executive
Director Place;
Chief Officer
Young People
and Partnerships
1. Digital Centre of Excellence at Newbattle Community High School 
2. Partnership agreement with the University of Edinburgh 
3. Beeslack Replacement High School, pilot project for next round of SFT
funding – funding model building in energy efficiency targets 
4. Accelerating our ambition – Digital Strategy 
5. Review of Digital team to support Digital Centre for Excellence  
4 5 
Page 112 of 114

Page 113

31   
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.OP.A.
07.01 Research and development
Q1 23/24: CivTech project successfully completed the pre-contractual agreement
stage. Further grant funding from SFT has enabled continuation of development of the
platform and insights in Midlothian schools and expansion to incorporate monitoring
and insights into Dalkeith office buildings. The project has been selected to present
again at the Learning Places Scotland conference and is engaging with the Scottish AI
Alliance.  
Director of
Education 31-Aug-2023  0%
SRP.OP.A.
07.03 Equipped for Learning 
Q3 23/24: As Q2. 
Q2 23/24: Refresh digital strategy, development of digital curriculum, development
and implementation of MACO 
Director of
Education  31 Mar 2024
31 July 2024 
0%      
Page 113 of 114

Page 114

Page 114 of 114