Notice of Meeting and Agenda 
Audit Committee 
Venue:  Council Chambers/Hybrid, 
Midlothian House, Dalkeith, EH22 1DN 
Date:  Monday, 30 October 2023 
Time:  14:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone:
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk
Page 1 of 260

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item
and the nature of their interest. 
4          Minute of Previous Meeting
4.1 Minute 7 March 2023 submitted for approval 3 - 8
4.2 Minute of 26 June 2023 submitted for approval 9 - 20
4.3 Action log 21 - 22 
5          Public Reports
5.1 Annual Audit Report to Members and the Controller of Audit -
year ended 31 March 2023, report by Audit Scotland, External
Auditors
23 - 52
5.2 Annual Accounts for the year ended 31 March 2023 53 - 162
5.3 Strategic Risk Profile Q1 202324, report by Chief Officer Place 163 - 202
5.4 Audit Committee Annual  End of Term Report 202223, report by
Chair of Audit Committee
203 - 222
5.5 Internal Audit Work to September 2023, report by Chief Internal
Auditor
223 - 244
5.6 Council House Building Programme Progress Update 2023,
report by Executive Director Place
245 - 260 
6          Private Reports 
No items for discussion 
7          Date of Next Meeting 
The next meeting will be held on Monday, 29 January 2024, 11am. 
Page 2 of 260

Page 3

Minute of Meeting 
Audit Committee 
Date Time Venue
Tuesday 7 March 2023 11:00am Council Chamber 
Midlothian House, 
Buccleuch Street, 
Dalkeith 
Present:
Councillor Smaill (Chair)
Councillor McEwan
Councillor McKenzie
Councillor Milligan 
Councillor Scott 
In Attendance:
Grace Vickers Chief Executive
Kevin Anderson Executive Director Place
Morag Barrow Joint Director Health and Social Care
Fiona Robertson Executive Director Children, Young People & Partnerships,
David Gladwin Acting Chief Financial Officer 
Duncan Stainbank  Chief Internal Auditor
Elaine Greaves Principal Internal Auditor
Alan Turpie Legal and Governance Manager / Monitoring Officer
Andrew Henderson Democratic Services Officer 
Audit Committee
Monday 30 October 2023
Item 4.1
Page 3 of 260

Page 4

1. Welcome and Apologies for Absence 
The Chair took the opportunity to welcome those in attendance to the meeting. 
2. Order of Business 
The order of business was as detailed in the agenda. 
3. Declarations of interest 
No declarations of interest were intimated at this stage of the proceedings. 
4. Minutes of Previous Meetings 
4.1 The minute of the meeting of 06 December 2022 was submitted and approved
as correct record, moved by Councillor McEwan and seconded by Councillor
Scott. 
4.2 The Action log was submitted and noted. 
With regard to action point 1, David Gladwin acknowledged that treasury
management was an emerging issue for Environmental, social, and corporate
governance (ESG) and that the sector was working through the details. With
regard to a timescale, David Gladwin outlined that it would be beneficial to link
the topic in with the general treasury update noting the implications of putting in
a new strategy based on the ESG factors and anticipated that the sector would
be able to have a discussion over the summer months. David Gladwin
confirmed that with regard to the current procedure the 22/23 strategy outlined
what could be done in terms of treasury management and confirmed that link
provided advice in relation to all counterparties. 
Members then took the opportunity to thank the Chief Executive for circulating
the National Records of Scotland data. 
5. Public Reports 
Report No. Report Title Submitted by:
5.1 Internal Audit Work to February 2023  Chief Internal
Auditor
Outline of report and summary of discussion
A brief summary of the report was provided with reference being made to recent
work that had been conducted by internal audit with an overview of Internal Audit
recommendations and findings being provided. A further overview of the
executive summary in relation to the Audit assurance reports was also provided,
in addition to details regarding the Chief Internal Auditors Opinion regarding the
adequacy of control environment and governance arrangements within each audit
area. 
Page 4 of 260

Page 5

In responding to questions, Duncan Stainbank clarified that with regard to
unsigned Service Agreements, this was solely due to the lack of a formal
signature and that service level agreements had been completed. 
A discussion ensued in relation to the inclusion of Arms Length and External
Organisations (ALEOs) and it was established that whilst Midlothian is a
shareholder in external organisations such as Lothian Buses and has a joint
account with Midlothian Energy Limited, that Midlothian Council did not have any
ALEO’s. It was agreed that clarification on this point would be sought after the
meeting.
There was further discussion in relation to the procedure for grant application
panels with members expressing concern regarding the fact that applicants were
only required to leave the discussion when their application was being discussed,
which Fiona Robertson outlined that there was a compact agreement regarding
panels with third sector organisations that determined the requirements and that
she was working with the Communities Team to assess how this could be taken
forward and agreed to report back at a future meeting.
Decision
a) Derek Oliver agreed to bring a report following up audit actions in relation
to building maintenance services in future. 
b) Clarification to be provided clarifying information on ALEOs;
c) Fiona Robertson to report back with regard to options in relation grant
application scoring/assessment panels. 
d) Audit Committee noted the progress Internal Audit has made with activity
in the Internal Audit Annual Plan 2022/23 to the end December 2022; and
e) Confirmed it’s satisfaction with the performance of the Internal Audit
service provision.
Action
a) Derek Oliver; 
b) Duncan Stainbank
c) Fiona Robertson
d) All to note
e) All to note 
Report No. Report Title Submitted by:
5.2 Counter Fraud Annual Plan 2023/24  Chief Internal
Auditor
Outline of report and summary of discussion
In speaking to the report Duncan Stainbank provided a brief overview of the
Counter Fraud Annual Plan 2023/24 making reference to the importance of
having robust fraud prevention and investigation arrangements and the need to
ensure preventative practices associated with the Counter Fraud Strategy as
approved by Council in August 2020. 
A brief discussion ensued in relation to whistleblowing in which members took the
opportunity to express concern in relation to the lack of feedback received by
whistleblowers following the conclusion of investigations. Duncan Stainbank
clarified that work was being undertaken to review the whistleblowing policy,
acknowledging that East Lothian’s policy included provision for feedback where
Page 5 of 260

Page 6

legally possible and where status of anonymity allowed. Duncan Stainbank
confirmed that a draft would be ready by May. 
In response to comments regarding major corporate fraud, Kevin Anderson
confirmed that lessons had been learnt from the SEPA exercise and that resource
had been added to address the regular occurrence of cyber-attacks. It was
agreed that outcomes would be reported at a later date and that a session would
be held as part of the future audit committee.
Decision
a) Audit Committee agreed that a session on outcomes of the SEPA exercise
would be brought to the next meeting of Audit Committee. 
b) Audit Committee approved the Counter Fraud Annual Plan as appended to
the report. 
Report No. Report Title Submitted by:
5.3 Internal Audit Charter  Report by Chief
Internal Auditor 
Chief Internal
Auditor
Outline of report and summary of discussion
Duncan Stainbank provided a brief overview of the internal audit charter as
appended to the report and confirmed that the Midlothian Council’s internal audit
charter has been updated to conform to the public sector internal audit standards.
Officers then took the opportunity to respond to points of clarity.
A discussion ensued in relation to the audit mechanisms for the MIJB. Morag
Barrow clarified that the MIJB follows both Council and NHS and that audits
conducted by the IJB are contained within the functions of the IJB. Duncan
Stainbank outlined that the remits for each are set out in the strategic directions
and councils approved guidelines. 
Decision
a) Audit Committee noted the changes to the Internal Audit Charter outlined
in section 4 of this report in conformance with Public Sector Internal Audit
Standards; 
b) Approved the revised Internal Audit Charter shown at Appendix 1; and  
c) Noted that the Internal Audit Charter will be reviewed annually. 
Report No. Report Title Submitted by:
5.4 Internal Audit Strategy and Annual Plan
2022/23 Report by Chief Internal Auditor
Chief Internal
Auditor
Outline of report and summary of discussion
Duncan Stainbank provided an overview of the Counter Fraud Annual Plan
2023/24 as appended to the report and outlined that approval would allow for the
Page 6 of 260

Page 7

writing of the annual opinions due for submission later in the year. Duncan
Stainbank then took the opportunity to respond to members questions. 
With regard to the Internal Audit Teams' capacity to respond to requests, Duncan
Stainbank confirmed 20 days for contingency and help desk tasks, and that if
further resources are required a request can be submitted to the Chief Executive.
Duncan Stainbank highlighted that, if required, this timescale could be reduced
but that a report might be required outlining the possible removal of an item from
the audit plan.  
Decision
Audit Committee agreed; 
a) Noted the changes to the Internal Audit Strategy outlined in section 4 of
this report; 
b) Noted the outline of the Internal Audit planning process outlined in section
5 of this report;
c) Approved the Internal Audit Strategy (Appendix 1); and  
d) Approved the Internal Audit Annual Plan 2023/24 (Appendix 2). 
6. Private Reports 
None 
7. Date of Next Meeting 
Date of Next Meeting: Tuesday 25 April 2023 at 11am. 
The meeting terminated at 11:46am 
Page 7 of 260

Page 8

Page 8 of 260

Page 9

Minute of Meeting 
Audit Committee 
Date Time Venue
Tuesday 26 June 2023 11:00am Council Chamber/Hybrid 
Present:
Councillor Smaill (Chair)
Councillor Bowen
Councillor McCall 
In Attendance:
Grace Vickers Chief Executive
Kevin Anderson Executive Director Place
Morag Barrow Joint Director Health and Social Care
Fiona Robertson Executive Director Children, Young People & Partnerships
Derek Oliver Chief Officer Place
David Gladwin Acting Chief Financial Officer 
Duncan Stainbank  Chief Internal Auditor
Elaine Greaves Principal Internal Auditor
Willie Venters Principal Solicitor
Janet Ritchie Democratic Services Officer 
Audit Committee
Monday 30 October 2023
Item 4.2
Page 9 of 260

Page 10

1. Welcome and Apologies for Absence 
The Chair welcomed Patricia Fraser from Audit Scotland and intimated
apologies on behalf of Claire Gardiner, Audit Scotland, Councillor Milligan and
Councillor McEwan. 
2. Order of Business 
The order of business was as detailed in the agenda and the chair indicated at
the end of the meeting there will be a brief discussion on the Chair’s report and
the Chair for the next meeting of the Audit Committee on 26 September 2023. 
3. Declarations of interest 
No declarations of interest were intimated at this stage of the proceedings. 
4. Minutes of Previous Meetings 
4.1 The minute of the meeting of 7 March 2023 was submitted but it was noted that
there were insufficient members present who had been in attendance at the
previous meeting therefore it was agreed this would be submitted to the next
meeting of the Audit Committee for approval. 
4.2 The Action log was submitted and noted. 
1. Responsible Treasury Management:  ongoing
2. Internal Audit Mid-Term Performance Report 2022/23: The report will be
submitted to BTSG then next Audit.
3. Internal Audit Work to February 2023: Clarification on ALEOs – Mr
Stainbank provided an update on the ALEOs and advised that the
procedures would be amended so they are clear what the definition of an
ALEO is going forward.  
In responding to a question from the Chair regarding Midlothian Energy and
that they do not have a Councillors on their governing body, Mr Stainbank
confirmed that the governance arrangements between the Council and the
ALEO would be within the scope of the Internal Audit arrangements and
confirmed there would be report on Midlothian Energy within the appropriate
cycle of the internal audit plan.  
Mr Anderson, in responding to a comment from the Chair with regards to a
report on Midlothian Energy confirmed that the annual business plan would
be presented to Council and then if required submitted to the Audit
committee.
4. Internal Audit Work to February 2023: Ms Robertson advised that they do
double check in terms of membership of the panel and at the last meeting
no-one declared an interest.  Ms Robertson also provided an update on the
external recruitment process previously used which worked well and that
they will be reviewing the membership of the panel going forward and
confirmed there will be proposals to eliminate conflicts of interest.
Page 10 of 260

Page 11

5. Public Reports 
Report No. Report Title Submitted by:
5.1 Counter Fraud Annual Report 2022/23 Chief Internal Auditor
Outline of report and summary of discussion
The purpose of the report was to make the Audit Committee aware of the
Council’s counter fraud responsibilities and the activities of the Integrity Group
and Corporate Fraud team in liaison with other services over the past year as part
of the arrangements to tackling fraud at the Council. 
The Chief Internal Auditor, Duncan Stainbank in presenting this report highlighted
the main sections contained within the report and highlighted that as a result of
counter fraud activity a total savings value of £360,070 has been identified during
2022/23 and that the total savings from the NFI 2020/21 exercise were estimated
at £718,557 and these outcomes are detailed in the appendices attached to the
report. 
Councillor McCall commented on the interesting report and highlighted the good
outcome in 5.2 and the collaborative working between the housing team and audit
team.
In responding to a question raised by the Chair, Ms Grieves advised that it was
unsure if these properties were involved in sub-letting but did confirm that in the
past it has been a mixture of sub-letting and abandoned houses.
Mr Stainbank also provided an update on the work regarding single occupancy
and the processes in place to match this with electoral register to confirm who is
living in the household and the recovery funds where possible.
Decision
The Audit Committee:
a) Considered the counter fraud work undertaken during the year to
31 March 2023 in support of the Council’s counter fraud policy
and strategy; and
b) Noted the outcomes of the counter fraud activity 2022/23. 
Report No. Report Title Submitted by:
5.2 Internal Audit Work to May 2023 Chief Internal Auditor
Outline of report and summary of discussion
The purpose of this report was to provide members of the Audit Committee with
details of the recent work carried out by Internal Audit and the findings and
recommended audit actions agreed by Management to improve internal controls
and governance arrangements. 
Page 11 of 260

Page 12

The Internal Audit Annual Plan 2022/23 was approved by the Audit Committee on
14 March 2022. Internal Audit has carried out work associated with the delivery of
the Plan to meet its objective of providing an opinion on the efficacy of the
Council’s risk management, internal control and governance. 
The Chief Internal Auditor, Duncan Stainbank in presenting this report advised
that internal audit issued the final assurance reports on Care at Home,
Construction projects and the Mental Health Services and the Chief Internal
Auditor’s independent and objective opinion on the adequacy of the control
environment and governance arrangements within each audit area, is shown in
Appendix 1 to the report. 
The Joint Director Health and Social Care, Morag Barrow in responding to a
question raised by Councillor McCall with regards to the overpayments paid to
two providers advised that after going to a new model of provisioning care at
home the two providers had committed to provide x amount of hours for the year
but struggled to do that and because it was a different model it just took a bit
longer to get the money back but confirmed that this had all been recovered now. 
Ms Barrow also advised that there was no mistake it was just that the length of
time it took for the process to get the money back.
Mr Stainbank also advised that at the time of the report writing there was
concerns about getting the money back but also confirmed the money is now all
paid back. 
In responding to a follow up question from the Chair regarding this happening
again, Ms Barrow advised there has always been a process in place and there
are weekly monitoring meetings and could see no reason which this would
reoccur but if it did it would be picked up immediately.
The Chair highlighted within Construction there were a number of areas which
were weak and sought clarity on this, in responding Mr Stainbank advised that
framework is in place but some of the elements of the procedures and processes
had changed and in 1 or 2 occasions procedures were not followed or items not
filled in but advised that he has no concerns over the overall framework.
Mr Stainbank further confirmed that all the processes are in place to resolve
those issues with the recommendations which are to be implemented by
September this year and advised that they will be making changes to the
reporting to make that link between the assurance statement given and the work
that has been undertaken in the audit clearer.
Mr Stainbank, in responding to the request from the Chair for a further updated
report confirmed that he would bring back an updated report on these
recommendations in December 2023.
Decision
The Audit Committee: 
a) Considered the Executive Summaries of the final Internal Audit
assurance reports issued associated with the delivery of the approved
Internal Audit Annual Plan 2022/23.
Page 12 of 260

Page 13

b) Noted the Internal Audit Consultancy and Other Work carried out in
accordance with the approved Internal audit Charter; and 
c) Acknowledged the assurance provided on internal controls and
governance arrangements in place for the areas covered by this Internal
Audit work.
d) Agreed that an updated report would be provided to the Audit
Committee at the December meeting.
Action
Chief Internal Auditor 
Report No. Report Title Submitted by:
5.3 Internal Audit Annual Assurance Report
2022/23 
Chief Internal Auditor
Outline of report and summary of discussion
The purpose of this report was to present to the Audit Committee the Internal
Audit Annual Assurance Report for the year to 31 March 2023 which includes
the Chief Internal Auditor’s independent assurance opinion on the adequacy of
Midlothian Council's overall control environment.
The Public Sector Internal Audit Standards (PSIAS) require that the chief audit
executive, the Council’s Chief Internal Auditor, provides an annual internal audit
opinion and report on the adequacy and effectiveness of the Council’s
governance, risk management and internal controls to support the preparation of
the Annual Governance Statement. This is in support of the overall governance
arrangements of the Council, as set out in the Local Code of Corporate
Governance.
To meet the requirements of the PSIAS, the Internal Audit Annual Assurance
Report 2022/23 (Appendix 1) includes the Chief Internal Auditor’s annual
opinion, provides details of the Internal Audit activity and performance during the
year to fulfil its role, and summarises the outcomes of assessments of the
Internal Audit service against the PSIAS.
The Chief Internal Auditor, Duncan Stainbank presented this report highlighting
the key areas of concern which included the level of resourcing for procurement
and compliance with procurement processes and procedures across the
Council. 
The Chair highlighted the work with Henderson Loggie as an outsourced
provider and the constraints within the audit team and if these two are related
due to the council not having a big enough audit team, in responding Mr
Stainbank advised on the gap in resources between the previous arrangement in
place with Scottish Borders and him coming into post and that Henderson
Loggie had been arranged to assist with the completion of the 2022/23 Internal
Audit Plan. In responding to a follow up question from the Chair, Mr Stainbank
advised the funds were in the budget for 2022/23 and this was carried forward to
this year to cover the costs this year.
Page 13 of 260

Page 14

Mr Stainbank in responding to a further question provided an update on the 3
audits which had been removed from the 2022/23 Audit plan and confirmed that
school budget will be covered in this year’s audit plan.
The Chair enquired as to there being any risks with destroying audit files and 
Mr Stainbank advised there had been a backlog but confirmed there should be
no risk as the audit files are destroyed following the retention policy
Decision
The Audit Committee:
(a) Considered the Internal Audit Annual Assurance Report 2022/23
(Appendix 1), and assurances contained therein; and
(b) Provided any commentary thereon, including any further actions
required by Management. 
Report No. Report Title Submitted by:
5.4 Draft Annual Governance Statement
2022/23
Chief Executive
Outline of report and summary of discussion
The purpose of this report was to propose that the Audit Committee considers and
approves the draft Annual Governance Statement that will be published in the
Council’s Statement of Accounts 2022/23.
Midlothian Council is responsible for ensuring that its business is conducted in
accordance with the law and proper standards, and that public money is
safeguarded and properly accounted for, and used economically, efficiently and
effectively.   The Council’s Local Code of Corporate Governance that was approved
by Council on 23 March 2021 was used to assist with the annual assurance
process 2022/23.
The draft Annual Governance Statement 2022/23, which is appended to this report
as Appendix 1 for consideration, is the output from the annual assurance process
and review against the updated Local Code. 
The Chief Executive, Grace Vickers presented this report outlining the main
sections contained within the Annual Governance Statement and highlighted the
key areas for improvement and the systems in place to regularly review and
improve governance arrangements and the system of internal control.
Mr Gladwin confirmed that this statement will be included in the Council’s
Statements of Accounts 2022/23.
Decision
The Audit Committee:  
a) Considered the details of the draft Annual Governance Statement
2022/23 at Appendix 1 to ensure it reflects the risk environment and
governance in place to achieve objectives, and acknowledge the actions
identified by Management to improve internal controls and governance
arrangements; and
Page 14 of 260

Page 15

b) Approved that it be published in the Council’s Statement of Accounts
2022/23, noting the requirement for the final Annual Governance
Statement to be signed by the Chief Executive and Leader of the
Council at the conclusion of the external audit process.
Action
Chief Executive/Leader of the Council 
Report No. Report Title Submitted by:
5.5 Unaudited Annual Accounts 2022/23 Chief Finance Officer
(Acting)
Outline of report and summary of discussion
The purpose of this report was to outline material changes in the value of net
assets at 31st March 2023 and to facilitate Audit Committee consideration of the
Council’s unaudited annual accounts for 2022/23. 
At the time of writing this report, final adjusted Lothian Pension Fund valuation
figures are not yet available and a final review of the remainder of the accounts is
taking place.
The Chief Finance Officer (Acting), David Gladwin provided an overview of the
timeline for the Annual Accounts and highlighted the main sections as contained
within the report.
The Chair highlighted the valuation changes to houses and the number of council
houses build dropped but work in progress and asked for assurance on the
effectiveness of the social housing programme and getting value from money.  In
responding Mr Anderson confirmed the average unit cost has increased and
provided an update advising that the annual report would be submitted to Council,
and this could also be shared with the Audit Committee.
Councillor McCall raised a question with regards to the increase in non-domestic
rates income and Mr Gladwin provided a brief update on how the Scottish
Government distributes the money and that it is not related to businesses in
Midlothian.  There followed further discussion regarding the revaluation and the
pressures this brought to Midlothian and Mr Gladwin provided an explanation on
the piece of work still ongoing with this and Mr Gladwin confirmed that he would
send information to Elected Members on the figures for the non-domestic rates. 
Mr Oliver in a response to Councillor McCall’s question provided an update on the
number of new businesses for 2020/21 - 83; 2021/22 - 124 and for 22/23 -121
new businesses.
Mr Gladwin confirmed that the financial statements will not go to Council until this
the Audit Committee approve the draft audited financial statements later in the
summer and confirmed that he would circulate a copy of the accounts which he
signs and submits to Audit Scotland, and they will also be published on the
Council’s website.
Page 15 of 260

Page 16

The Chair thanked Mr Gladwin and his team for all the work that has gone into
this document.
Decision 
In accordance with The Local Authority Accounts (Scotland) Regulations 2014
set out in section 3.2 of this report and specifically sections 8 (9) and 8 (10), Audit
Committee considered the unaudited annual accounts for 2022/23. 
Report No. Report Title Submitted by:
5.6 Annual Treasury Management Report
2022/23
Chief Finance Officer
(Acting)
Outline of report and summary of discussion
The purpose of the report was to inform members of the Audit Committee of the 
Treasury Management activity undertaken in 2022/23 and the year-end position.
The Chief Finance Officer (Acting), David Gladwin advised that this would be
presented to Council on 27 June 2023, and he would update them on any
discussions from today’s meeting, thereafter Mr Gladwin highlighted the main
sections as contained within the report.
In responding to questions raised by Councillor McCall regarding the significant
risks to that central forecast and an explanation on the useable reserves of
£90.583 m, Mr Gladwin provided an explanation on the risk on borrowing
decisions and interest rates to support capital projects.  Mr Gladwin further
provided an explanation on the useable reserves of £90m which are held in the
general fund, housing revenue account and the capital fund and the decision
taken as part of the treasury strategy is to place those on short term deposit and
will get some interest on them but also keep them readily available should they be
required.  
The Chair enquired if there was any indication when the VAT money will be paid
and Mr Gladwin advised we do not have the money in the bank, but it has been
accounted for in 2022/23 and we do have the certainty that we will receive it, the
first claim should be soon and the second one may take a bit longer.
Councillor McCall raised a further question with regards to the overall Midlothian’s
loans fund rate of 2.41% and Mr Gladwin advised that this is a calculation of all
the borrowing and investment costs over the year and Midlothian has been one of
the lowest in Scotland for some time. 
Decision
The Audit Committee is invited to consider this report before the final report is
resented to Council. Committee should note that the proposed recommendation to
Council is that it note the Annual Treasury Management Report 2022/23. 
Page 16 of 260

Page 17

Report No. Report Title Submitted by:
5.7 Treasury Management and Investment
Strategy 2023/24 – Credit Risk Update,
Chief Finance Officer
(Acting)
Outline of report and summary of discussion
This paper has been prepared to provide an update to Audit Committee members
on the current market position regarding credit risk on deposits, the Council’s
exposure to credit risk, and how this risk is mitigated through the Council’s
assessment of counterparty creditworthiness in the approved TMIS.
Chief Finance Officer (Acting), Mr Gladwin advised that at the request of
members at the Council meeting on 21 March 2023, he has prepared a report to
update members on the current market position regarding credit risk following the
collapse of Silicon Valley Bank and Credit Suisse and failure of Signature bank
and provided a brief outline of the contents of the report.
The Chair referred to the table on P99 and Mr Gladwin advised that Link are clear
that all the entities in the table are assessed in accordance with their credit
criteria and they are well within the safe approach to depositing money.  
Mr Gladwin then responded to a further question with regards to borrowing with
local authorities and provided an explanation on the reasons why this has
changed.
Councillor Bowen raised a question with regards to depositing money and Mr
Gladwin provided an explanation on how the decisions are made using external
advisors, the treasury strategy and their own internal process and the decision is
made by him as the Section 95 Officer within an approved strategy and
methodology.
Decision
The Audit Committee noted the content of this report. 
Report No. Report Title Submitted by:
5.8 Midlothian Council Annual Audit Plan Executive Director
Place
Outline of report and summary of discussion
This document summarises the work plan for our 2022/23 external audit of
Midlothian Council. The main elements of our work include: 
• evaluation of the key controls within the main accounting systems 
• an audit of the annual accounts, and provision of an Independent
Auditor’s Report 
• audit opinions on the financial statements and other statutory
information published within the Annual Accounts including the
Management Commentary, Annual Governance Statement and the
Remuneration Report 
Page 17 of 260

Page 18

• consideration of arrangements in relation to wider scope areas: financial
management; financial sustainability; vision, leadership and
governance; and use of resources to improve outcomes. 
• consideration of Best Value arrangements 
• providing assurance on the Housing Benefit Subsidy Claim, Non-
Domestic Rates Return and the Whole of Government Accounts (WGA)
return. 
• reviewing the council’s arrangements for preparing and publishing
statutory performance information. 
Senior Audit Manager, Patricia Fraser presented the Annual Audit plan outlining
some of the key points contained within the report and highlighted which included
materiality levels and a summary of the nature of the risk – detailed in Exhibit 1
and 2; the wider scope risks -detailed in Exhibit 3 and highlighted that the fee has
increased in 2022/23 and noted the concerns around the increased cost and
provided a brief summary of the reasons for this increase.
In responding to a question raised by the Chair, Ms Fraser confirmed that the
additional work is around outcomes, leadership, and environmental activities and
some of this work has already been carried out.
Decision
The Audit Committee noted the content of this report 
Report No. Report Title Submitted by:
5.9 Risk Management Update – Strategic Risk
Profile Q4 2022/23
Chief Officer Place
Outline of report and summary of discussion
The purpose of this report was to provide Audit Committee with: 
i. An update on the risk responses Midlothian Council has implemented
during Q4 2022/23 to respond to the current risk climate.
ii. Assurance that Midlothian Council took a proportionate and planned
approach to prepare and respond to the current risk climate.
iii. The risk evaluation of current strategic risks and opportunities for the
Council.
Chief Officer Place, Derek Oliver presented this report highlighting main sections
contained within the report.
The Chair raised cyber risk and Mr Oliver advised this was included in the risk
profile and discussions had taken place.
Decision
Audit Committee noted the current risk landscape and organisational response to
the most significant risks in Quarter 4 (Q4) 2022/23 (1 January to 31 March 2023). 
Page 18 of 260

Page 19

6. Private Reports 
None 
7. Date of Next Meeting 
Date of Next Meeting: Tuesday 26 Sept at 11am. 
The Chair advised that as there was no independent Chair the arrangement was to
share the Chair around the groups and that he was initially to take up the post of
Chair until July 2023, thereafter Councillor Milligan would take up the Chair then
ultimately Councillor McEwan.  However, as the Chairman’s report was not
completed and in discussion with officers, the suggestion was that Councillor Smaill
would continue in the position of chair for the next meeting. 
This was unanimously agreed. 
The meeting terminated at 12.14 pm.
Page 19 of 260

Page 20

Page 20 of 260

Page 21

Audit Committee 
Action Log 
No Subject Date Action Action Owner Expected
completion
date
Comments
1 Responsible treasury
management 
06/12/2022 Session with members to be
organised with regard to
Responsible treasury
management/ethical issues.
Acting Chief
Financial
Officer
Ongoing  Carry forward, paper
coming forward regarding
CSG and ethical
depositing coming later in
the year. 
2 Internal Audit Mid-
Term Performance
Report 2022/23
07/02/2023 Derek Oliver to submit a
report to Audit Committee
following up on audit actions
for Building Maintenance
Services. 
Chief Officer
Place
September
2023
Report will be presented to
BTSG then submitted to
the next Audit Committee
3 Internal Audit Work to
February 2023
07/03/2023 Clarification to be provided
via a post meeting comment
clarifying information on
ALEOs;
Chief Internal
Auditor
25/04/2023 Recommended for
closure: 
Mr Stainbank clarified that
the Council has one
operating ALEO and one
non-operating and
confirmed that the
procedure would be
amended so they are clear
on the definition of ALEO.
4 Internal Audit Work to
February 2023
07/03/2023 Fiona Robertson to report
back with regard to options
for panels in relation grant
application panels.
Executive
Director
Children, Young
People &
Partnerships 
Recommended for
closure: 
Ms Robertson provided an
update on the membership
of the panel and that there
Audit Committee
Monday 30 October 2023
Item No: 4.3  
Page 21 of 260

Page 22

Audit Committee 
No Subject Date Action Action Owner Expected
completion
date
Comments
will be proposals brought
forward to eliminate any
conflicts of interest.
5 Internal Audit work to
May 2023
26/06/2023 An updated report would be
submitted to the Audit
Committee in December
2023
Mr Stainbank December 2023 Recommended for
closure: Report on the
agenda covering Internal
Audit Work to September
2023. 
6 Unaudited Accounts
2022/23
16/06/2023  Mr Gladwin confirmed that he
would send information to
Elected Members on the figures
for the non-domestic rates
David Gladwin September 2023 Recommended for
closure: 
Information circulated to
Elected Members on 23
August 2023 
Page 22 of 260

Page 23

102 West Port
Edinburgh 
EH3 9DN  
T: 0131 625 1500
E: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk 
Midlothian Council Audit Committee
30 October 2023
Midlothian Council
Audit of 2022/23 annual accounts 
Independent auditor's report
1.  Our audit work on the 2022/23 annual accounts is now substantially complete. Subject to the
receipt of a revised set of annual accounts for final review, we anticipate being able to issue
unqualified audit opinions in the independent auditor's report on 30 October 2023 (the proposed
report is attached at Appendix A).  
Annual audit report
2.  Under International Standards on Auditing in the UK, we report specific matters arising from
the audit of the financial statements to those charged with governance of a body in sufficient
time to enable appropriate action. We present for the Audit Committee’s consideration our draft
significant findings and key audit matters identified in respect of the annual accounts.
3.  The full annual audit report, including our conclusions on the wider scope that frame public
audit, will be issued in final form after the annual accounts have been certified by the appointed
auditor.
Unadjusted misstatements
4.  We also report to those charged with governance all unadjusted misstatements which we
have identified during our audit, other than those of a trivial nature and request that these
misstatements be corrected.
5.  We identified two unadjusted misstatements to be corrected. If corrected, this would reduce
net expenditure by £0.631 million and increase the net assets in the statement of financial
position by the same amount. 
Fraud, subsequent events and compliance with laws and regulations
6.  In presenting this report to the Audit Committee we seek confirmation from those charged
with governance of any instances of any actual, suspected or alleged fraud; any subsequent
events that have occurred since the date of the financial statements; or material non-
compliance with laws and regulations affecting the entity that should be brought to our attention.
Representations from Section 95 Officer
7.  As part of the completion of our audit, we are seeking written representations from the
Section 95 Officer on aspects of the annual accounts, including the judgements and estimates
made.
Page 23 of 260

Page 24

8.  A draft letter of representation is attached at Appendix B. This should be signed and
returned to us by the Chief Financial Officer (Section 95 Officer) with the signed annual
accounts prior to the independent auditor’s report being certified. 
Page 24 of 260

Page 25

Appendix A:  Proposed Independent Auditor’s Report
Independent auditor’s report to the members of Midlothian
Council and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts of Midlothian Council
and its group for the year ended 31 March 2023 under Part VII of the Local Government
(Scotland) Act 1973. The financial statements comprise the group and council Comprehensive
Income and Expenditure Statement, Movement in Reserves Statement, Balance Sheet and
Cash Flow Statement, the council-only Housing Revenue Account, the Council Tax Income
Account, and the Non-Domestic Rate Account and notes to the financial statements, including
significant accounting policies. The financial reporting framework that has been applied in their
preparation is applicable law and UK adopted international accounting standards, as interpreted
and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom
2022/23 (the 2022/23 Code).
In my opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the council and its
group as at 31 March 2023 and of the income and expenditure of the
council and its group for the year then ended;
• have been properly prepared in accordance with UK adopted
international accounting standards, as interpreted and adapted by the
2022/23 Code; and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland
Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards on Auditing
(UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the Accounts
Commission for Scotland. My responsibilities under those standards are further described in the
auditor’s responsibilities for the audit of the financial statements section of my report. I was
appointed by the Accounts Commission on 5 June 2023. My period of appointment is five years,
covering 2022/23 to 2026/27. I am independent of the council and its group in accordance with
the ethical requirements that are relevant to my audit of the financial statements in the UK
including the Financial Reporting Council’s Ethical Standard, and I have fulfilled my other ethical
responsibilities in accordance with these requirements. Non-audit services prohibited by the
Ethical Standard were not provided to the council. I believe that the audit evidence I have
obtained is sufficient and appropriate to provide a basis for my opinion.
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the preparation of the
financial statements is appropriate.
Based on the work I have performed, I have not identified any material uncertainties relating to
events or conditions that, individually or collectively, may cast significant doubt on the ability of
Page 25 of 260

Page 26

the council and its group to continue to adopt the going concern basis of accounting for a period
of at least twelve months from when the financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the current or future
financial sustainability of the council and its group. However, I report on the council’s
arrangements for financial sustainability in a separate Annual Audit Report available from the
Audit Scotland website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of material misstatement
that I identified and my judgements thereon.
Responsibilities of the Chief Financial Officer and the audit committee for the
financial statements
As explained more fully in the Statement of Responsibilities, the Chief Financial Officer is
responsible for the preparation of financial statements that give a true and fair view in
accordance with the financial reporting framework, and for such internal control as the Chief
Financial Officer determines is necessary to enable the preparation of financial statements that
are free from material misstatement, whether due to fraud or error.
In preparing the financial statements, the Chief Financial Officer is responsible for assessing the
ability of the council and its group to continue as a going concern, disclosing, as applicable,
matters related to going concern and using the going concern basis of accounting unless there
is an intention to discontinue the operations of the council and its group.
The Audit Committee is responsible for overseeing the financial reporting process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial statements as a
whole are free from material misstatement, whether due to fraud or error, and to issue an
auditor’s report that includes my opinion. Reasonable assurance is a high level of assurance,
but is not a guarantee that an audit conducted in accordance with ISAs (UK) will always detect a
material misstatement when it exists. Misstatements can arise from fraud or error and are
considered material if, individually or in the aggregate, they could reasonably be expected to
influence the decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. I
design procedures in line with my responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include:
• using my understanding of the local government sector to identify that
the Local Government (Scotland) Act 1973, The Local Authority
Accounts (Scotland) Regulations 2014, and the Local Government in
Scotland Act 2003 are significant in the context of the council and its
group;
• inquiring of the Chief Financial Officer as to other laws or regulations
that may be expected to have a fundamental effect on the operations of
the council and its group;
• inquiring of the Chief Financial Officer concerning the policies and
procedures of the councils and its group regarding compliance with the
applicable legal and regulatory framework;
Page 26 of 260

Page 27

• discussions among my audit team on the susceptibility of the financial
statements to material misstatement, including how fraud might occur;
and
• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance
with laws and regulations.
The extent to which my procedures are capable of detecting irregularities, including fraud, is
affected by the inherent difficulty in detecting irregularities, the effectiveness of the council’s
controls, and the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that
result from error as fraud may involve collusion, intentional omissions, misrepresentations, or
the override of internal control. The capability of the audit to detect fraud and other irregularities
depends on factors such as the skilfulness of the perpetrator, the frequency and extent of
manipulation, the degree of collusion involved, the relative size of individual amounts
manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is
located on the Financial Reporting Council's website www.frc.org.uk/auditorsresponsibilities.
This description forms part of my auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts of the
Remuneration Report
I have audited the parts of the Remuneration Report described as audited. In my opinion, the
audited parts of the Remuneration Report have been properly prepared in accordance with The
Local Authority Accounts (Scotland) Regulations 2014.
Other information 
The Chief Financial Officer is responsible for the other information in the annual accounts. The
other information comprises the Management Commentary, Annual Governance Statement,
Statement of Responsibilities and the unaudited parts of the Remuneration Report. 
My responsibility is to read all the other information and, in doing so, consider whether the other
information is materially inconsistent with the financial statements or my knowledge obtained in
the course of the audit or otherwise appears to be materially misstated. If I identify such material
inconsistencies or apparent material misstatements, I am required to determine whether this
gives rise to a material misstatement in the financial statements themselves. If, based on the
work I have performed, I conclude that there is a material misstatement of this other information,
I am required to report that fact. I have nothing to report in this regard.
My opinion on the financial statements does not cover the other information and I do not
express any form of assurance conclusion thereon except on the Management Commentary
and Annual Governance Statement to the extent explicitly stated in the following opinions
prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management Commentary and
Annual Governance Statement
In my opinion, based on the work undertaken in the course of the audit:
Page 27 of 260

Page 28

• the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with
the financial statements and that report has been prepared in
accordance with statutory guidance issued under the Local Government
in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is
consistent with the financial statements and that report has been
prepared in accordance with the Delivering Good Governance in Local
Government: Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited parts of the Remuneration
Report are not in agreement with the accounting records; or
• I have not received all the information and explanations I require for my
audit.
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the wider scope
responsibilities specified in the Code of Audit Practice, including those in respect of Best Value,
are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of
the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with
paragraph 108 of the Code of Audit Practice, I do not undertake to have responsibilities to
members or officers, in their individual capacities, or to third parties. 
[Signature]
Claire Gardiner CPFA
Audit Director
Audit Scotland
102 West Port
Edinburgh
EH3 9DN 
Page 28 of 260

Page 29

Appendix B:  Letter of Representation (ISA 580) 
Claire Gardiner, Audit Director
Audit Scotland
102 West Port
Edinburgh
EH3 9DN
Dear Claire 
Midlothian Council
Annual Accounts 2022/23
1. This representation letter is provided about your audit of the annual accounts of Midlothian
Council and its group (hereafter referred to as Midlothian Council) for the year ended 31 March
2023 for the purpose of expressing an opinion as to whether the financial statements give a true
and fair view in accordance with the financial reporting framework, and for expressing other
opinions on the remuneration report, management commentary and annual governance
statement.
2. I confirm to the best of my knowledge and belief and having made appropriate enquiries of
the Chief Executive and Corporate Management Team, the following representations given to
you in connection with your audit of Midlothian Council’s annual accounts for the year ended 31
March 2023.
General
3. Midlothian Council and I have fulfilled our statutory responsibilities for the preparation of the
2022/23 annual accounts. All the accounting records, documentation and other matters which I
am aware are relevant to the preparation of the annual accounts have been made available to
you for the purposes of your audit. All transactions undertaken by Midlothian Council have been
recorded in the accounting records and are properly reflected in the financial statements.  
4. I confirm that the effects of uncorrected misstatements are immaterial, individually and in
aggregate, to the financial statements as a whole. I am not aware of any uncorrected
misstatements other than those reported by you. 
Financial Reporting Framework
5. The annual accounts have been prepared in accordance with the Code of Practice on Local
Authority Accounting in the United Kingdom 2022/23 (2022/23 accounting code), and the
requirements of the Local Government (Scotland) Act 1973, the Local Government in Scotland
Act 2003 and The Local Authority Accounts (Scotland) Regulations 2014.
6. In accordance with the 2014 regulations, I have ensured that the financial statements give a
true and fair view of the financial position of Midlothian Council and its Group at 31 March 2023
and the transactions for 2022/23. 
Accounting Policies & Estimates
7. All significant accounting policies applied are as shown in the notes to the financial
statements. The accounting policies are determined by the 2022/23 accounting code where
applicable. Where the code does not specifically apply I have used judgement in developing
and applying an accounting policy that results in information that is relevant and reliable. All
Page 29 of 260

Page 30

accounting policies applied are appropriate to Midlothian Council’s circumstances and have
been consistently applied.
8. The significant assumptions used in making accounting estimates are reasonable and
properly reflected in the financial statements. Judgements used in making estimates have been
based on the latest available, reliable information. Estimates have been revised where there are
changes in the circumstances on which the original estimate was based or as a result of new
information or experience.
Going Concern Basis of Accounting
9. I have assessed Midlothian Council’s ability to continue to use the going concern basis of
accounting and have concluded that it is appropriate. I am not aware of any material
uncertainties that may cast significant doubt on Midlothian Council’s ability to continue as a
going concern. 
Assets
10. Where a rolling programme of asset valuations has been used, I have satisfied myself that
the carrying amount of assets at 31 March 2023 does not differ materially from that which would
be determined if a revaluation had been carried out at that date.
11. I carried out an assessment at 31 March 2023 as to whether there is any indication that an
asset may be impaired and have recognised any impairment losses identified.
12. I have provided you with all information of which I am aware regarding any valuation
exercises carried out after 31 March 2023. 
13. There are no plans or intentions that are likely to affect the carrying value or classification of
the assets recognised within the financial statements.
14. Owned assets are free from any lien, encumbrance or charge except as disclosed in the
financial statements. 
Liabilities
9.  All liabilities at 31 March 2023 of which I am aware have been recognised in the annual
accounts.
10.  Provisions have been recognised in the financial statements for all liabilities of uncertain
timing or amount at 31 March 2023 of which I am aware where the conditions specified in the
2022/23 accounting code have been met. The amount recognised as a provision is the best
estimate of the expenditure likely to be required to settle the obligation at 31 March 2023.
Where the effect of the time value of money is material, the amount of the provision has been
discounted to the present value of the expected payments.
11.  Provisions recognised in previous years have been reviewed and adjusted, where
appropriate, to reflect the best estimate at 31 March 2023 or to reflect material changes in the
assumptions underlying the calculations of the cash flows.
12.  The accrual recognised in the financial statements for holiday untaken by 31 March 2023
has been estimated on a reasonable basis.
13.  The pension assumptions made by the actuary in the IAS 19 report for Midlothian Council
have been reviewed and I confirm that they are consistent with management's own view.
Page 30 of 260

Page 31

14.  There are no plans or intentions that are likely to affect the carrying value or classification of
the liabilities recognised in the financial statements.
Contingent liabilities
15.  There are no significant contingent liabilities, other than those disclosed in Note 36 to the
financial statements, arising either under formal agreement or through formal undertakings
requiring disclosure in the accounts. All known contingent liabilities have been fully and properly
disclosed, including any outstanding legal claims which have not been provided under the
2022/23 accounting code and IAS 37.
Fraud
16.  I have provided you with all information in relation to:
• my assessment of the risk that the financial statements may be materially misstated
because of fraud 
• any allegations of fraud or suspected fraud affecting the financial statements
• fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect on
the financial statements. 
Laws and Regulations
17.  I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when preparing
financial statements.
Related Party Transactions
18.  All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with the 2022/23 accounting code.  I have
made available to you the identity of all Midlothian Council’s related parties and all the related
party relationships and transactions of which I am aware.
Remuneration Report
19.  The Remuneration Report has been prepared in accordance with the Local Authority
Accounts (Scotland) Amendment Regulations 2014, and all required information of which I am
aware has been provided to you.
Management commentary
20.  I confirm that the Management Commentary has been prepared in accordance with the
statutory guidance and the information is consistent with the financial statements. 
Corporate Governance
21.  I confirm that Midlothian Council has undertaken a review of the system of internal control
during 2022/23 to establish the extent to which it complies with proper practices set out in the
Delivering Good Governance in Local Government: Framework 2016. I have disclosed to you all
deficiencies in internal control identified from this review or of which I am otherwise aware.
22.  I confirm that the Annual Governance Statement has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework 2016 and the information is
consistent with the financial statements. There have been no changes in the corporate
Page 31 of 260

Page 32

governance arrangements or issues identified, since 31 March 2023, which require to be
reflected. 
Group Accounts
23.  I have identified all the other entities in which Midlothian Council has a material interest and
have classified and accounted for them in accordance with the 2022/23 accounting code. Any
significant issues with the financial statements of group entities, including any qualified audit
opinions, have been advised to you.
Common Good Fund
24.  I confirm, to the best of my ability, that all material common good assets have been
identified and correctly accounted for within the common good financial statements and where
appropriate, common good assets in use by the Council have been assessed and accounted for
in line with IAS 17.  
Events Subsequent to the Date of the Balance Sheet
25.  All events subsequent to 31 March 2023 for which the 2022/23 accounting code requires
adjustment or disclosure have been adjusted or disclosed. 
Yours sincerely 
Chief Financial Officer (Section 95 Officer)
Page 32 of 260

Page 33

Prepared for the Members of Midlothian Council and the Controller of Audit
October 2023
Midlothian Council
2022/23 Annual Audit Report 
Page 33 of 260

Page 34

Midlothian Council 2022/23 Annual Audit Report | 2
Contents 
Key messages 3
Introduction 4
1. Audit of 2022/23 annual accounts 6
Appendix 1. Action plan 2022/23 16
Appendix 2. Summary of uncorrected misstatements 18
Page 34 of 260

Page 35

Key messages | 3 
Key messages 
2022/23 annual accounts 
1 Audit opinions on the annual accounts of the council and its group are
unmodified.
2 As part of our audit, we carried out work on the key risks identified in our
Annual Audit Plan. There are no significant matters from that work to draw to
the attention of the Audit Committee.
3 Management made adjustments of £16.1 million to the annual accounts. The
most significant adjustments related to the re-measurement of the net defined
benefit for the unfunded pension obligations of £7.8 million and the
reclassification of £5.9 million debtors and creditors balances. 
Page 35 of 260

Page 36

Introduction | 4 
Introduction 
1.  This report summarises the findings from the 2022/23 annual audit of
Midlothian Council (the Council). The scope of the audit was set out in an
annual audit plan presented to the June 2023 meeting of the Audit Committee.
Audit appointment from 2022/23.
Audit appointment from 2022/23
2.  I, Claire Gardiner, have been appointed by the Accounts Commission as
auditor of the Council for the period from 2022/23 until 2026/27. The 2022/23
financial year was the first of my five-year appointment. My appointment
coincides with the new Code of Audit Practice which was introduced for financial
years commencing on or after 1 April 2022.
3.  My team and I would like to thank councillors, audit committee members,
senior management, and other staff, particularly those in finance, for their
cooperation and assistance in this year and we look forward to working together
constructively over the course of the five-year appointment.
Responsibilities and reporting 
4.  The Council has primary responsibility for ensuring the proper financial
stewardship of public funds. This includes preparing annual accounts that are in
accordance with proper accounting practices. The Council is also responsible
for compliance with legislation and putting arrangements in place for
governance and propriety that enable it to successfully deliver its objectives.
5.  The responsibilities of the independent auditor are established by the Local
Government (Scotland) Act 1973 and the Code of Audit Practice 2021, and
supplementary guidance and International Standards on Auditing in the UK. 
6.  Weaknesses or risks identified are only those which have come to our
attention during our normal audit work and may not be all that exist.
Communicating these does not absolve management of the Council from its
responsibility to address the issues we raise and to maintain adequate systems
of control.
7.  This report contains an agreed action plan at Appendix 1. It sets out specific
recommendations, the responsible officers, and dates for implementation. 
Auditor Independence 
8.  We can confirm that we comply with the Financial Reporting Council’s Ethical
Standard. We can also confirm that we have not undertaken any non-audit
related services and therefore the 2022/23 audit fee of £273,550 as set out in
Page 36 of 260

Page 37

Introduction | 5 
our 2022/23 Annual Audit Plan remains unchanged. We are not aware of any
relationships that could compromise our objectivity and independence. 
Page 37 of 260

Page 38

1. Audit of 2022/23 annual accounts | 6 
1. Audit of 2022/23 annual
accounts
Public bodies are required to prepare annual accounts comprising
financial statements and other related reports. These are principal
means of accounting for the stewardship public funds.  
Main judgements
Audit opinions on the annual accounts of the council and its group are unmodified. 
As part of our audit, we carried out work on the key risks identified in our Annual
Audit Plan. There are no significant matters from that work to draw to the attention
of the Audit Committee. 
Management made adjustments of £16.1 million to the annual accounts. The most
significant adjustments related to the re-measurement of the net defined benefit
for the unfunded pension obligations of £7.8 million and the reclassification of £5.9
million debtors and creditors balances.
Audit opinions on the annual accounts are unmodified 
9.  The council approved the annual accounts for the Council and its group for
the year ended 31 March 2023 on 30 October 2023. As reported in the
independent auditor’s report, in my opinion as the appointed auditor:
• the financial statements give a true and fair view and were properly
prepared in accordance with the financial reporting framework
• the audited parts of the Remuneration Report have been properly
prepared in accordance with The Local Authority Accounts (Scotland)
Regulations 2014
• the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with
the financial statements and that report has been prepared in
accordance with statutory guidance issued under the Local Government
in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is
consistent with the financial statements and that report has been
Page 38 of 260

Page 39

1. Audit of 2022/23 annual accounts | 7 
prepared in accordance with the Delivering Good Governance in Local
Government: Framework (2016).
Overall materiality was assessed as £7.6 million 
10.  The concept of materiality is applied by auditors to determine whether
misstatements identified during the audit could reasonably be expected to
influence the economic decisions of users of the financial statements, and
hence impact their opinion set out in the independent auditor’s report. Auditors
set a monetary threshold when considering materiality, although some issues
may be considered material by their nature. It is ultimately a matter of the
auditor’s professional judgement.
11.  Our initial assessment of materiality for the Council and its group, was
carried out during the risk assessment and planning phase of the audit. This
was reviewed and revised on receipt of the unaudited annual accounts and is
summarised in Exhibit 1. 
Exhibit 1
Materiality values 
Materiality level Council and
Group
Overall materiality £7.6 million
Performance materiality  £4.6 million
Reporting threshold  £0.25 million
Source: Audit Scotland 
12.  The overall materiality threshold for the audit of the annual accounts of the
Council was set with reference to gross expenditure, which we judged as the
figure most relevant to the users of the financial statements.
13.  Performance materiality is used by auditors when undertaking work on
individual areas of the financial statements. It is a lower materiality threshold,
set to reduce the probability of aggregated misstatements exceeding overall
materiality. Performance materiality was set at 60% of overall materiality,
reflecting our risk assessment which was informed by the level of errors in prior
years and the control environment in place at the Council.
14.  It is our responsibility to request that all misstatements, other than those
below our reporting threshold, are corrected, although the final decision on
making the correction lies with those charged with governance.
Page 39 of 260

Page 40

1. Audit of 2022/23 annual accounts | 8 
Significant findings and key audit matters
15.  Under International Standard on Auditing (UK) 260 we communicate
significant findings from the audit to the council, including our view about the
qualitative aspects of the body’s accounting practices.
16.  The Code of Audit Practice also requires all audits to communicate key
audit matters within the annual audit report under International Standard on
Auditing (UK) 701. These are matters that we judged to be of most significance
in our audit of the financial statements. Significant findings and key audit
matters are summarised in Exhibit 2.
Exhibit 2
Significant findings and key audit matters from the audit of the annual accounts 
Issue Resolution 
1. Restricting the value of pension asset 
For the first time, the unaudited accounts included
a pension asset rather than a liability. This
amounted to £188 million and was calculated by
the council’s actuary. 
The pension accounting standard (IAS 19) limits
any pension asset to the lower of the surplus and
what is described as an asset ceiling. The asset
ceiling is defined as the present value of any
economic benefits available in the form of refunds
from the pension fund or reductions in future
contributions to the fund. 
Further guidance on calculating the asset ceiling is
provided in IFRIC 14. It refers to the impact of a
‘minimum funding requirement’ which stipulates a
minimum amount of contributions that must be paid
over a given period. The existence of a minimum
funding requirement limits the ability of a body to
reduce future contributions. 
Where there is a minimum funding requirement for
contributions relating to future service, IFRIC 14
explains that the asset ceiling is the present value
of the future service cost less the present value of
the minimum funding requirement contributions. 
Where actuaries report that the present value of
the minimum funding requirement contributions
exceeds the future service cost, IFRIC 14 advises
that no asset should be recognised. 
We reviewed the actuary’s assumptions
and the Council’s assessment of the
actuary’s assumptions and calculation in
conjunction with IAS 19 and the
application of IFRIC 14.
The council included additional
disclosures in the audited annual
accounts to clearly show the effect of
the asset ceiling.
The annual accounts were adjusted to
reflect a pension asset of zero for the
Council’s funded obligations, and a
pension liability of £7.8 million for its
unfunded obligations, for which the
IFRIC 14 calculation does not apply.
We concluded that, for 2022/23, the
Council’s approach to recognising a
pension asset and applying an asset
ceiling in the accounts was appropriate.
Page 40 of 260

Page 41

1. Audit of 2022/23 annual accounts | 9 
Issue Resolution 
The council applied an asset ceiling which
restricted the pension asset to a nil balance in the
balance sheet as at 31 March 2023. 
As part of our audit work we identified that the
IFRIC 14 calculation did not cover the unfunded
pension liability and therefore where the pension
asset was restricted to zero the unfunded pension
obligation should be netted off against the
restricted balance and included as a liability in the
financial statements.  
2. Reinforced Autoclaved Aerated Concrete in
council buildings
Reinforced autoclaved aerated concrete (RAAC) is
a lightweight construction material that was used in
the construction of some public buildings like
schools and hospitals between the 1950s and
1990s. It was used mostly in flat roofing, but also in
some pitched roofs, floors and walls.
On 31 August 2023 the UK Department for
Education (DfE) announced that any space or area
in schools, colleges or nurseries in England, with
confirmed RAAC should no longer be open without
"mitigations" being put in place.
During 2022/23, the Council reviewed of buildings
across the school estate and did not identify any
RAAC in the surveyed schools.  Further surveys
are planned on the remaining buildings within the
Council’s estate.  
We are satisfied that the Council has
taken appropriate action to address the
risk of RAAC within their estate.  
As no RAAC has been identified we are
satisfied that there is no requirement for
a post balance sheet event relating to
liabilities in relation to remedial works. 
3. Remuneration report disclosures
The audit of the Remuneration Report identified a
number of errors and other disclosure changes that
were required to ensure the reports were fully
compliant with applicable guidance. These
included: 
• the remuneration table did not include a senior
councillor who commenced this role in March
2023 
• there were minor errors in the pension
movements for two employees
• the disclosures around pay bands had been
calculated incorrectly in regard to starters and
leavers.  The bands should be based on actual
salaries of all starters and leavers but the whole
year equivalent had been used.
Management have reviewed the
disclosures within the Remuneration
Report and have updated the
information.
We are satisfied that the revised
Remuneration Report fulfils the
disclosure requirements of applicable
guidance.
Page 41 of 260

Page 42

1. Audit of 2022/23 annual accounts | 10 
Issue Resolution 
4. Disclosures in the notes to the accounts
The notes to the accounts help provide contextual
information and detail which will help the reader
understand the primary statements.  Our audit
work identified some areas where the classification
of transactions or balances was incorrectly
disclosed within the notes to the accounts.
• Within short term deposits at 31 March 2022,
£50 million was reclassified as cash and cash
equivalents. The balance sheet was also
revised to correct the misclassification.
• Within Group investments £5.6 million was
reclassified as the Group share of net assets of
associates and joint ventures.
• Within the short term debtors note there was
£11.2 million of classification movements
between other trade debtors, central
government bodies and council tax debtors.
• Within income £3.2 million was reclassified from
fees and charges income to investment income.
• Within non-current assets £0.7 million was
incorrectly classified as assets under
construction and land in operation. 
We acknowledge that only one of the 
misclassifications identified impacted on
the figures on the face of the primary
financial statements.  We are satisfied
that management have addressed all
significant misclassifications within the
notes to the accounts in year.  
The Council should ensure going
forward that control accounts such as
trade debtors are reviewed to ensure
balances with central government and
other public sector bodies are classified
appropriately at the year-end.
Recommendation 1
Source: Audit Scotland
Our audit work responded to the risks of material misstatement
we identified in the annual accounts
17.  We have obtained audit assurances over the identified significant risks of
material misstatement in the annual accounts. Exhibit 3 sets out the significant
risks of material misstatement to the financial statements we identified in our
2022/23 Annual Audit Plan. It also summarises the further audit procedures we
performed during the year to obtain assurances over these risks and the
conclusions from the work completed. 
Exhibit 3
Significant risks of material misstatement in the annual accounts
Audit risk Assurance procedure Results and conclusions
1. Risk of material
misstatement due to fraud
Owing to the nature of this
risk, assurances from
• We assessed the design
and implementation of
controls over journal entry
Page 42 of 260

Page 43

1. Audit of 2022/23 annual accounts | 11 
Audit risk Assurance procedure Results and conclusions
caused by management
override of controls
As stated in International
Standard on Auditing (UK)
240, management is in a
unique position to perpetrate
fraud because of
management’s ability to
override controls that
otherwise appear to be
operating effectively.
management are not
applicable in this instance
processing. Exhibit 5
identifies an opportunity to
strengthen the controls
over journals.
• Our testing of journals,
year-end transactions,
accruals and prepayments
did not identify any
incidents of management
override of controls.  
• We did not identify any
unusual journal activity.  
• Our assessment of the
adequacy of controls in
place for identifying and
disclosing related party
relationship and
transactions in the
financial statements did
not highlight any
weaknesses. 
• The methods and
assumptions used to
prepare accounting
estimates were confirmed
to be consistent with prior-
years.
• As a result of the above
work we are satisfied that
there is no material
misstatement arising from
this risk.  
2. Estimation in the
valuation of other land and
buildings
Midlothian Council hold land
and buildings (non-housing)
with a NBV of £526 million as
at 31 March 2022. 
There is a significant degree
of subjectivity and complexity
in the valuation of land and
buildings.  Valuations are
based on specialist and
management assumptions
and changes in these can
result in material changes to
Council procedures and
controls around valuation and
accounting.
We did not identify any issues
with the information provided
to the valuer. 
Our review of the council’s
valuation team’s work, and
the external valuer, confirmed
the appropriateness of the
methodology and
assumptions used. We did
not identify any non-
compliance with RICS
guidance. 
We found that management
have an appropriate level of
involvement and oversight of
Page 43 of 260

Page 44

1. Audit of 2022/23 annual accounts | 12 
Audit risk Assurance procedure Results and conclusions
valuations. Material errors
were also identified in the
prior year valuation process
by the prior year auditor.
The 2022/23 revaluation
exercise is planned to cover a
significant proportion of the
estate.
Due to the inherent
complexity and subjectivity
risks regarding land and
buildings’ valuations and
material errors found in the
prior year, a significant risk of
material misstatement in the
2022/23 valuations has been
identified.
the valuation process. We
concluded that
management’s assessment
that land and buildings not
revalued in 2022/23 are not
materially misstated, to be
reasonable, and found
assumptions made to be
appropriate. 
We found that appropriate
disclosures have been made
regarding the assumptions in
relation to the valuation of
land and buildings. 
Source: 2022/23 Midlothian Council Annual Audit Plan
18.  In addition, we identified “areas of audit focus” in our 2022/23 Annual Audit
Plan where we considered there to be risks of material misstatement to the
financial statements. The results of our audit procedures and conclusions are
set out in Exhibit 4.
Exhibit 4
Identified areas of audit focus
Audit risk Results and conclusion
Valuation of pension liability
The council is an admitted body of Lothian
Pension Fund and recognised a net pension
liability of £54 million as at 31 March 2022.
The liability requires the use of an actuarial
methodology based on a range of
assumptions including financial and
demographic assumptions. The subjectivity
around these assumptions gives rise to a risk
of material misstatements in the financial
statements. 
We will assess the scope, independence and
competence of the professionals engaged in
providing estimates for pensions and review
appropriateness of actuarial assumptions and
We are satisfied that the pension liability is
correctly recognised on the balance sheet at
31 March 2023 and has been accounted for
and disclosed correctly in line with International
Accounting Standard (IAS) 19 Retirement
benefits.
We use an auditor’s expert to inform our
review of the assumptions used in calculating
this estimate and management’s judgements.
We concluded the assumptions are
appropriate and within a range which we
consider to be acceptable.
We are also satisfied the controls in place over
the provision of information to the actuary are
appropriate.
Page 44 of 260

Page 45

1. Audit of 2022/23 annual accounts | 13 
Audit risk Results and conclusion
results including comparison with other
councils. We will establish officer’s
arrangements for ensuring the
reasonableness of professional estimations
and the accuracy of information provided to
the actuary by Midlothian Council.
Teachers’ payroll
Two pay awards have been granted in
2022/23. The Council is progressing
implementing the awards but work in this
area is incomplete and calculations for supply
teachers can be complex. We will monitor
progress in implementing teachers pay
awards and test controls in the payroll system
to ensure staff costs are complete, valid, and
accurate.
We reviewed the design and implementation of
controls over changes to pay which includes
pay awards.  We concluded that the controls
over changes were designed appropriately.
We conducted analytical procedures regarding
the pay award in year comparing the actual
amounts charged as expenditure to our
expectation.  We identified a variance which
indicates that national insurance and pension
costs relating to the 2021/22 pay increase
were not accrued in the prior year.  Accounting
standards require the adjustment of material
prior period errors only. We are satisfied that
this would not be material and therefore no
prior period adjustment has been made. 
Financial controls cash and bank
Material errors in the unaudited cash and
bank figures were identified by the previous
external auditors. 
These were identified as relating to the failure
of bank reconciliation controls. We will follow
up agreed actions and perform a full system
review in this area in 2023.
Bank reconciliations were conducted for each
month in 2022/23.  In addition to this a year
end reconciliation was conducted with no
issues arising.  
We are satisfied that the balance reported at
the year end is not materially misstated. 
Source: 2022/23 Midlothian Council Annual Audit Plan
Identified misstatements of £16.1 million were adjusted in the
annual audited accounts
19.  Total adjustments of £16.1 million were made to the annual audited
accounts. The most significant adjustments related to the re-measurement of
the net defined benefit for the unfunded element of pension contributions of
£7.8 million and  the reclassification of £5.9 million debtors and creditors
balances.
20.  Adjustments made in the audited accounts reduced the total comprehensive
income and expenditure surplus by £2.9 million and reduced net assets in the
balance sheet by £2.9  million.
Page 45 of 260

Page 46

1. Audit of 2022/23 annual accounts | 14 
21.  We identified two misstatements which were not corrected by management
in the audited accounts. Management considered the size, nature and
circumstances leading to all uncorrected misstatements, individually and in
aggregate, and concluded that these were not material.  
22.  The unaudited annual accounts were received in line with our agreed audit
timetable on 30 June 2023. The working papers provided with the unaudited
accounts were of a good standard and finance and other council staff provided
good support to the audit team during the audit. 
23.  Covid-19 has had a considerable impact on the delivery of audits and we
are working to deliver timely audits while maintaining quality.  In order to
preserve the quality of our work in year the audit was delayed against our
planned timetable with the accounts being signed on 30 October 2023.  This
allowed the statutory deadline for publication to be met.
Financial systems of internal control
24.  From our review of the design and implementation of systems of internal
control (including those relating to IT) relevant to our audit approach.  We did
not identify any issues with the design of the controls which would increase the
risk of a material misstatement in the financial statements. However, we
identified three areas where controls could be improved:
Exhibit 5 
Key findings from review of key controls 
Audit finding  Additional audit procedures 
1. Journals  
The council’s financial ledger is the system for
recording all transactions and preparing the
financial statements. Journal entries are how the
council’s financial ledger is manually updated.  We
conducted controls testing over this area and
identified the following issues:
• To minimise the risk of error and fraud we
would expect each journal entry to be prepared
and authorised by different members of staff.
This control is not in operation for a small
number of staff within the finance team. The
ability of officers to approve their own journals
increases the risk that invalid, erroneous or
fraudulent journals could be posted to the
financial ledger.
• Access to the ledger requires to be tightly
controlled to mitigate the risk of fraudulent mis-
postings.  We identified in year that access
rights were not regularly reviewed. We also
found there were some users with a high level
We reviewed the journals across the
year to identify those which had been
posted by those with a higher level of
access.  We identified some journals
which relate to former employees,
however, they relate to interfaces with
the ledger which are not actually
posted but are automatic journals. 
The user recorded is the user who
created the interface.  We are
satisfied that there are compensating
controls within the overall IT access
rights which would prevent ex-
employees accessing the ledger.
Our journals testing across the year
reflected the increased risk arising
from self-approval of journals and we
did not identify any issues. 
Recommendation 2 (refer Appendix
1, action plan) 
Page 46 of 260

Page 47

1. Audit of 2022/23 annual accounts | 15 
of access rights which had not been timeously
removed.  
• We tested a sample of 17 journals to ensure the
approvals process had been followed.  There
was insufficient evidence of authorisation for
one of the sample.  
Journals procedures should be
reviewed to minimise the risk with the
ability of members of the finance team
to approve their own journals.
2. Bank reconciliations 
Bank reconciliations are a critical control to ensure
that cash is accurately recorded in the ledger.  We
found that bank reconciliations were performed for
each month of the year but the reconciliations
completed for periods 10 to 12 were not
completed timeously.
In addition at the year-end we identified over 20
bank accounts (mainly imprest accounts) with
small balances which were not reconciled to the
ledger on a regular basis.
We are satisfied that a reconciliation
was conducted at the year end with
no issues arising. 
The bank letter at the year-end
confirmed that the smaller imprest
accounts were below our trivial level
and did not represent a risk of
material misstatement.  We note that
a number of accounts have a zero
balance.
Recommendation 3 (refer Appendix
1, action plan) 
Bank reconciliations should be
conducted on a monthly basis for all
accounts which are in use.  The
Council should also consider the bank
accounts held and if they are still
required. 
3. Payroll reconciliations 
The Council undertakes a reconciliation between
the ledger and the payroll system on a monthly
basis in line with good practice.  We reviewed an
example of one month’s reconciliation in 2022/23
and found limited evidence that the discrepancies
between the ledger and payroll were not being
followed up or investigated on a timely basis.
We reviewed the year-end
reconciliation between the ledger and
payroll system and concluded that the
employee costs included in the ledger
at the year-end were appropriate.
Recommendation 4 (refer Appendix
1, action plan) 
The Council should ensure any work
conducted in reconciling the ledger to
payroll is appropriately evidenced.
Source: Audit Scotland
25.  Our work has been undertaken to provide an audit opinion on the annual
report and accounts, and in response to our additional responsibilities set out in
the Code of Audit Practice. The control deficiencies reported here are limited to
those we identified while completing our audit work for these purposes.
Page 47 of 260

Page 48

Appendix 1. Action plan 2022/23 | 16 
Appendix 1. Action plan
2022/23 
2022/23 recommendations 
Issue/risk Recommendation  Agreed management
action/timing
1. Review of control
accounts for classifications
Our audit work identified
some areas where the
classification of transactions
or balances was incorrectly
disclosed within the notes to
the accounts.
Risk – the notes to the
accounts do not reflect the
underlying categories of the
transactions.
The Council should ensure
going forward that control
accounts such as trade
debtors are reviewed to
ensure balances with central
government and other public
sector bodies are classified
appropriately at the year-end.
Exhibit 4,4 
A further layer of internal
review will be implemented
for the 2023/24 accounts to
ensure that the accuracy of
Balance Sheet and
Disclosure note classification
is enhanced.
Chief Financial Officer
March 2024
2. Journals
We reviewed the journals
across the year to identify
those which had been posted
by those with a higher level of
access.  We identified some
journals which relate to
former employees, however,
they relate to interfaces with
the ledger which are not
actually posted but are
automatic journals.
Risk – there is a risk of fraud
or error.
Journals procedures should
be reviewed to minimise the
risk with the ability of
members of the finance team
to approve their own journals.
Exhibit 5,1 
We operate a control
environment where staff at a
designated level of seniority
do not require counter
signature. This being a
reflection of the trust placed
in senior employees and also
to maintain a degree of
practicality. I feel this is an
acceptable risk for journal
entries as non-cash
transactions.
Chief Financial Officer
October 2023 
3. Bank reconciliations
bank reconciliations were
performed for each month of
the year but the
The Council should ensure
bank reconciliations are
performed and reviewed in a
timely manner. The Council
should also consider the bank
There was a period during
2022/23 where reconciliations
were not completed in line
with normal established
timescales due to staff
Page 48 of 260

Page 49

Appendix 1. Action plan 2022/23 | 17 
Issue/risk Recommendation  Agreed management
action/timing
reconciliations completed for
periods 10 to 12 were not
completed timeously.
In addition at the year end we
identified over 20 bank
accounts (mainly imprest
accounts) with small
balances which were not
reconciled to the ledger on a
regular basis.
Risk – there is a risk that
errors may not be picked up
and corrected timeously .
There is also a risk that the
Council is operating a
number of bank accounts
which are no longer required.
accounts held and if they are
still required. 
Exhibit 5,2
unavailability. Since then
reconciliations have returned
to a normal cycle.
Chief Financial Officer
October 2023
4. Payroll reconciliations
The Council undertakes a
reconciliation between the
ledger and the payroll system
on a monthly basis in line
with good practice.  We
reviewed an example of one
month’s reconciliation in
2022/23 and found limited
evidence that the
discrepancies between the
ledger and payroll were not
being followed up or
investigated on a timely
basis.
The Council should ensure
any work conducted in
reconciling the ledger to
payroll is appropriately
evidenced.
Exhibit 5,3 
Agreed. 
Page 49 of 260

Page 50

Appendix 2. Summary of uncorrected misstatements | 18 
Appendix 2. Summary of
uncorrected misstatements 
We report all uncorrected misstatements in the annual report and
accounts that are individually greater than our reporting threshold of
£250,000.
The table below summarises uncorrected misstatements that were noted during
our audit testing and were not corrected in the financial statements.
Cumulatively these errors are below our performance materiality level as
explained in Exhibit 1. We are satisfied that these errors do not have a material
impact on the financial statements.
Narrative Account areas
Comprehensive Income
and Expenditure
Statement
Balance Sheet
Accounting
Misstatements 
Dr Cr Dr Cr  
£m £m £m £m
1. Asset addition
recognised in incorrect
period
Payables       0.312
PPE     0.312  
2. Expenditure
reclassification
CIES 0.631      
PPE additions    0.631
Page 50 of 260

Page 51

Appendix 2. Summary of uncorrected misstatements | 19  
Midlothian Council
2022/23 Annual Audit Report 
Audit Scotland’s published material is available for download 
on the website in a number of formats. For information on our 
accessibility principles, please visit:
www.audit-scotland.gov.uk/accessibility
For the latest news follow us on social media or
subscribe to our email alerts. 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk
AS.4.0 
Page 51 of 260

Page 52

Page 52 of 260

Page 53

Audit Committee 
Monday 30th October 2023
Item No:  5.2   
Annual Accounts for the year ended 31 March 2023 
Report by David Gladwin, Chief Financial Officer & Section 95 Officer 
Report for Decision 
1 Recommendation 
Audit Committee is recommended to approve the 2022/23 audited
accounts for signature in light of the appointed auditor’s report for
2022/23. 
2 Purpose of Report/Executive Summary 
The purpose of this report is to present the Council’s audited Financial
Statements for 2022/23 to Audit Committee and to provide a brief
overview of findings during the audit process. 
24th October 2023. 
Report Contact:
David Gladwin Tel No 0131 271 3113 
E mail david.gladwin@midlothian.gov.uk 
Page 53 of 260

Page 54

2 
3 Background 
Council submitted its unaudited annual accounts to the external auditor
by the required date of 30th June 2022 and they were examined in
detail at Audit Committee on Monday 26th June 2023. 
3.1 Regulations 
The Local Authority Accounts (Scotland) Regulations 2014 set out the
requirements for completion, approval and signing of the accounts
which are as follows. 
10 (1) A local authority, or a committee of that authority whose remit includes audit or
governance functions, must—
(a) Meet to consider the audited Annual Accounts; and
(b) Aim to approve those accounts for signature as described in this
regulation no later than 30th September immediately following the financial
year to which the accounts relate.
10 (2) That local authority or committee must consider whether the Annual Accounts
should be signed, having regard to any report made on those accounts and any
advice given by the proper officer or the auditor.
10 (3) immediately following the approval of the Annual Accounts for signature, the
statements which form part of those accounts are to be signed and dated as
follows—
(a) the management commentary by the proper officer, the Chief
Executive and the Leader of the Council;
(b) the statement of responsibilities by the Leader of the Council and the
proper officer, who must also certify the matters referred to in paragraphs (5)
and (6) respectively;
(c) the annual governance statement by the Chief Executive and the Leader
of the Council;
(d) the remuneration report by the Chief Executive and the Leader of the
Council; and
(e) the balance sheets by the proper officer, to authorise publication of the
financial statements.
10 (4) Where a local authority does not have a Chief Executive or a Leader of the
Council, the statements that paragraph (3) requires that person to sign are to be
signed by such other person as it nominates for that purpose.
10 (5) The person who signs the statement of responsibilities as Leader of the
Council must certify that the Annual Accounts have been approved for signature by,
or on behalf of, the authority.
10 (6) The proper officer must certify that the financial statements give a true and fair
view of the financial position of the local authority and its group at the end of the
financial year and the transactions of the local authority and its group for that year.
10 (7) Following the signature of the Annual Accounts, the proper officer must provide
the Annual Accounts, including the signed statements, to the auditor.
10 (8) Any further report provided by the auditor following the signature of the Annual
Accounts which relates to those accounts must be considered by the local authority
or a committee of that authority whose remit includes audit or governance functions. 
Due to additional challenges across the sector in completing and
auditing financial statements during 2020/21 and 2021/22 Scottish
Ministers agreed to an extension to statutory timescales. Whilst this
does not extend into 2022/23 accounts normal deadlines remain
challenging. Local authorities are required to publish signed annual
accounts no later than 31st October immediately following the financial
year to which they relate. 
Page 54 of 260

Page 55

3
Accordingly, the accounts are presented to Audit Committee today as
required by the regulations alongside the 2022/23 Annual Audit Report
to Members and the Controller of Audit – year ended 31 March 2023
prepared by the appointed external auditor, Audit Scotland. 
The full external auditors report including commentary extending
beyond the 2022/23 accounts will be presented to Audit Committee in
December prior to full Council on Tuesday 19th December. A copy of
the audited accounts will be provided to all members of Council. 
3.2 Audit findings 
Audit Scotland have issued an unqualified audit opinion on the 2022/23
financial statements for the Council and its Group. 
Adjustments to the Unaudited Financial Statements 
3.2.1 Accumulated Absence Account 
Regulations allow a statutory adjustment to the Accumulated Absence
Account for a financial assessment of the liability relating to unused
annual leave at the balance sheet date. Calculations reflected in the
unaudited accounts also include values relating to flexitime and time off
in lieu balances and this is consistent with previous years but is not in
accordance with latest accounting guidance. The following adjustment
for this has been made to the draft audited accounts: 
• Cr Comprehensive Income and Expenditure Account - £0.681
million
• Dr Statutory Adjustments - £0.681million
• Dr Creditors - £0.681 million
• Cr Employee Benefits Statutory Adjustment Account - £0.681
million. 
3.2.2 Scottish Government Funding for Ukrainians 
The unaudited accounts provided for an assessment of the outstanding
funding position from the Scottish Government for Ukrainian
resettlement schemes. It was accepted at this time that work was
underway to re-calculate funding for all Scottish Local Authorities and
this would not conclude until after the unaudited accounts were
finalised. 
Since publishing the unaudited accounts two significant events have
occurred and are reflected in the draft audited financial statements:
1. The figures calculated for arrival payments and thank you
payments did not contain the most up to date rates of funding
per individual. This understated the value of funding due to
the Council by the Scottish Government by £0.351 million.
2. A national reconciliation of funding was concluded tracking
movement of people between Local Authority areas. This
resulted in a further £0.419 million becoming due to
Midlothian Council.
Page 55 of 260

Page 56

4   
Accordingly, the following adjustments have been made to the draft
audited accounts:
• Cr Comprehensive Income and Expenditure Account -
£0.770 million
• Dr Debtors - £0.664 million
• Dr Creditors £ 0.106 million   
These entries increase the Council’s General Fund balance by £0.770
million to £34.963 million with all the increase specifically earmarked for
use in supporting Ukrainian resettlement.  
3.2.3 Debtors and Creditors 
Audit work highlighted two presentational errors between debtors and
creditors in the Balance Sheet that have been adjusted in the accounts.
The cumulated adjustment is:
• Dr Debtors - £5.948 million
• Cr Creditors - £5.948 million 
These adjustments have no impact on the CIES or on any Reserves
totals. 
3.2.4 Lothian Pension Fund Valuation 
The accounting standard imposes a limit on the maximum amount of
surplus which can be recognised on an employer’s balance sheet and
this limit depends on factors unique to each employer. The limitation on
valuation is based on the remaining future working lifetime of active
staff and the present value of accruing service cost less value of cash
contributions. 
Figures in this context show that the net present value of future
employer contributions exceeds the future employer service costs thus
giving a negative contribution. Accounting standards dictate that in
these circumstances no asset or liability should be disclosed in the
Council’s Balance Sheet. 
However, audit review of actuarial valuations and application of
accounting standards has highlighted that any unfunded element of a
Pension Fund Valuation must either be offset against any asset shown,
or in the case of Midlothian as a liability. The actuarial valuation at the
31st March 2023 shows £7.800 million of unfunded assets.
Consequently, the Councils accounts have been adjusted with the
following entries:
• Dr Pension Reserve - £7.800 million
• Cr Net Pension Liability - £7.800 million 
Unfunded benefits are liabilities of individual employers as a
consequence of discretionary enhanced severance approvals. There
are no plan assets to meet these liabilities. 
Page 56 of 260

Page 57

5
3.3 Management Commentary, Remuneration Report, Annual
Governance Statement and Disclosures 
As indicated by Audit Scotland the unaudited financial statements were
prepared to a good standard and were materially compliant with the
Code and required disclosures. As part of the audit process, the
Council’s finance team worked with Audit Scotland to make
amendments and enhancements to the presentation of the financial
statements. Particular enhancements were made to the Remuneration
Report and disclosure notes 23 (Debtors), 25 (Creditors) and 12 (Grant
Income). 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource
Whilst this report deals with financial issues there are no financial
implications arising directly from it. 
4.2 Digital 
There are no digital issues arising directly from this report. 
4.3 Risk
Section 95 of the Local Government (Scotland) Act 1973 requires all
Local Authorities in Scotland to have adequate systems and controls in
place to ensure the proper administration of their financial affairs. The
Council’s Standing Orders and Financial Regulations detail the
responsibilities of members and officers in relation to the conduct of the
Council’s financial affairs. 
4.4 Ensuring Equalities
There are no equality implications arising directly from this report. 
4.5 Additional Report Implications 
See Appendix A 
Page 57 of 260

Page 58

6
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan
The financial statements set out the utilisation of resources committed
to support the delivery of the key priorities in the single Midlothian Plan. 
A.2 Key Drivers for Change
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value
The report does not directly impact on Delivering Best Value. 
A.5 Involving Communities and Other Stakeholders
No consultation was required. 
A.6 Impact on Performance and Outcomes
The proposals in this report do not directly impact on performance or
outcomes. 
A.7 Adopting a Preventative Approach 
The proposals in this report do not directly impact on the adoption of a
preventative approach. 
A.8 Supporting Sustainable Development 
There are no sustainability issues arising from this report. 
Appendix – Draft Audited Annual Accounts 2022/23 
Page 58 of 260

Page 59

MIDLOTHIAN COUNCIL UNAUDITED
ANNUAL ACCOUNTS
2022/23 
Page 59 of 260

Page 60

Table of Contents   
WWW.MIDLOTHIAN.GOV.UK 1 
Table of Contents 
Table of Contents ................................................................................................................................................... 1
Management Commentary .................................................................................................................................... 3
About Midlothian Council ........................................................................................................................... 3
Key Priorities and Objectives ...................................................................................................................... 4
Key Achievements and Highlights for 2022/23 ........................................................................................... 6
Financial Performance 2022/23 .................................................................................................................. 6
Risks and Uncertainties Facing the Council ..............................................................................................15
How the Council Manages Risk .................................................................................................................16
Looking Ahead ..........................................................................................................................................16
Conclusion .................................................................................................................................................17
Acknowledgements ..................................................................................................................................18
Statement of Responsibilities ............................................................................................................................... 19
Annual Governance Statement ............................................................................................................................ 20
Remuneration Report ........................................................................................................................................... 26
Introduction ..............................................................................................................................................26
Remuneration of Councillors ....................................................................................................................26
Remuneration of Employees ....................................................................................................................27
Pension Benefits .......................................................................................................................................28
Remuneration of Other Employees by Pay Bands ....................................................................................31
Exit Packages .............................................................................................................................................31
Trade Union Facility Time .........................................................................................................................32
Independent Auditor’s Report .............................................................................................................................. 33
Principal Financial Statements .............................................................................................................................. 37
Group and Council Comprehensive Income & Expenditure Statement ...................................................38
Group and Council Movement in Reserves Statement.............................................................................39
Group and Council Balance Sheet .............................................................................................................40
Group and Council Cash Flow Statement .................................................................................................41
Expenditure and Funding Analysis ........................................................................................................................ 42
Notes to the Accounts .......................................................................................................................................... 43
1. Accounting Policies ......................................................................................................................43
2. Accounting Standards Issued, Not Yet Adopted ..........................................................................56
3. Critical judgements in Applying Accounting Policies ...................................................................56
4. Future Assumptions and Estimation Uncertainties .....................................................................57
5. Events after the Reporting Period ................................................................................................59
6. Note to the Expenditure and Funding Analysis ............................................................................60
7. Adjustments between the Accounting Basis and Funding Basis under Regulations ...................61
Page 60 of 260

Page 61

Table of Contents   
WWW.MIDLOTHIAN.GOV.UK 2 
8. Movement in Earmarked Reserves ..............................................................................................63
9. Other Operating Income and Expenditure ...................................................................................64
10. Financing and Investment Income and Expenditure....................................................................64
11. Taxation and Non-Specific Grant Income ....................................................................................64
12. Grant Income ...............................................................................................................................64
13. Expenditure and Income Analysed By Nature .............................................................................65
14. Property Plant and Equipment .....................................................................................................66
15. Infrastructure Assets ....................................................................................................................69
16. Heritage Assets.............................................................................................................................69
17. Intangible Assets ..........................................................................................................................70
18. Long-term Debtors .......................................................................................................................70
19. Financial Instruments ...................................................................................................................70
20. Nature and Extent of Risks Arising from Financial Instruments ...................................................75
21. Assets Held for Sale ......................................................................................................................78
22. Inventories ...................................................................................................................................78
23. Debtors .........................................................................................................................................78
24. Cash and Cash Equivalents ...........................................................................................................79
25. Creditors .......................................................................................................................................79
26. Provisions .....................................................................................................................................79
27. Grants Received in Advance .........................................................................................................79
28. Usable Reserves ...........................................................................................................................80
29. Unusable Reserves .......................................................................................................................80
30. External Audit Costs .....................................................................................................................83
31. Related Parties .............................................................................................................................83
32. Capital Expenditure and Capital Financing...................................................................................84
33. Public Private Partnership (PPP) and Similar Contracts ...............................................................84
34. Pension Schemes Accounted for as Defined Contribution Schemes ...........................................87
35. Defined Benefit Pension Schemes ...............................................................................................87
36. Contingent Liabilities ....................................................................................................................91
37. Trusts, Bequest, Common Good and Community Funds .............................................................92
38. Notes to the Group Accounts .......................................................................................................92
Housing Revenue Account .................................................................................................................................... 95
Council Tax Income Account ................................................................................................................................. 97
Non-Domestic Rate Account ................................................................................................................................ 99
Glossary of Terms ............................................................................................................................................... 100
Page 61 of 260

Page 62

Management Commentary 
WWW.MIDLOTHIAN.GOV.UK 3 
Management Commentary 
The Management Commentary is intended to assist users in understanding the objectives and strategy of
the Council and provide a review of its business and financial performance for the year.  It also outlines the
principal risks and uncertainties which are likely to affect the future development and performance of the
Council. 
The Annual Accounts present the financial position and performance of the Council demonstrating the
stewardship of funds that support the Council’s vision and key priorities.  The format and content of the
Annual Accounts are prepared in accordance with Code of Practice in Local Authority Accounting in the
United Kingdom.
About Midlothian Council 
Midlothian Council is located south of Edinburgh centred on the main towns of Penicuik, Dalkeith,
Bonnyrigg and Lasswade.  One of the smaller local authority areas, but also the fastest growing, it has
emerged as a world centre for the Bioscience industry.  Some key facts about Midlothian are: 
MidlothianEmployees
5,158
Population
94,680 (mid
2021)
Primary
Schools 33
Secondary
Schools 6
Elected
Members 18
(SNP 8, Lab 7,
Con 3)
Page 62 of 260

Page 63

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 4 
Council Service Structure 
Key Priorities and Objectives 
Midlothian Council’s key priorities and objectives are set out in the Single Midlothian Plan 2022/23 (SMP). 
These priorities are delivered through the Community Planning Partnership- (CPP), which sets out how we
work with communities and partners to deliver our vision for Midlothian to be a “Great Green Place to
Grow”.  
The Single Midlothian Plan has identified its three main outcomes for the next five years, 
• Individuals and communities have improved health and learning outcomes;
• No child or household living in poverty;
• Significant progress is made towards net zero carbon emissions by 2030.
These form the common and strategic guidance for the Council and its partners to encourage plans and
measures to be developed to work towards enabling individuals and communities being able to lead
healthier, safer, greener and successful lives by 2030.
Dr Grace Vickers
Chief Executive
PEOPLE AND
PARTNERSHIPS
Fiona Robertson
Executive Director Children,
Young People and
Parnerships
Chief Education Officer
Joan Tranent
Chief Officer Children's
Services, Partnerships and
Commuinities
Chief Social Work Officer
Michelle Strong
Chief Education Operating
Officer
Morag Barrow
Joint Health and Social Care
Chief Officer IJB
Nick Clater
Head of Adult Social Care
Grace Cowan
Head of Primary Care and
Older People
PLACE
Kevin Anderson
Executive Director Place
Saty Kaur
Chief Officer
Corporate Solutions
Derek Oliver
Chief Officer Place
Fiona Clandillion
Head of
Development
FINANCE
David Gladwin
Chief Financial Officer
Section 95 Officer
Page 63 of 260

Page 64

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 5 
In line with the Single Midlothian Plan the Council’s strategic goal is to create a wellbeing economy where
our people and environment flourish. With a continued focus on Early Intervention and Prevention,
Midlothian aspires to be a socially, economically and ecologically sustainable community by 2030. The
Council aims to reduce inequalities in learning outcomes, health outcomes and economic circumstances at
the same time as working towards carbon neutral status by 2030.  The goal is supported by five strategic
outcomes:
Page 64 of 260

Page 65

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 6 
1. Fostering empowered, inclusive, resilient and safe communities – The adoption of the Place
Principle will help promote a shared understanding of Place and the need to take a more
collaborative approach to Place’s services and assets to achieve better outcomes for peoples and
communities.  The principle encourages and enables local flexibility to respond to issues and
circumstances in different places.
2. Supporting individuals and communities to be the best they can be – this will be achieved through
a nurturing, respectful and collaborative approach that promotes wellbeing, equity, inclusion and
lifelong learning.
3. Transforming health and social care – The Council’s services will provide the right support, at the
right time and in the right place.  This will be achieved by placing more importance and a greater
proportion of the Councils resources on the Council’s key values.
4. Accelerating inclusive growth – the Council will deliver an ambitious capital programme, providing
new passive standard homes and upgrade infrastructure across the county, leverage the
opportunities through the City Region Deal and facilitate opportunities for inward investment and
inclusive growth.
5. Carbon Neutral by 2030 – the Council will work with its communities and partners to be carbon
neutral by 2030, providing green clean spaces for its residents, promoting modal shift, behavioural
change and active travel.
The annual Balanced Scorecard measures progress towards these outcomes and is used to demonstrate
ongoing improvements and reflect the ongoing challenges within Midlothian.  The full detail behind the
performance indicators measured by the balanced scorecard for 2022/23 can be found on the Council’s
website Midlothian Council/Performance and spending.
Key Achievements and Highlights for 2022/23  
Achievement Commentary
Implementation of
House Project, for
care- experienced
young people.
Midlothian is among one of the first local authorities in Scotland to set up a
House Project, which offers secure social tenancies and a programme of peer
learning and support for young people leaving care or who are homeless.  The
project is being championed by the charity Crises, who recognises the work done
by the Council’s Children’s Services department and partners in its report 75
ways to prevent homelessness.
Scottish Education
Award for Head
Teacher of the year
2022
Out of the three Head Teachers shortlisted, two were from Midlothian, for
Dalkeith and St David’s High Schools.
Provision of Affordable
Housing
The Council’s Strategic Housing Investment Programme (SHIP) was submitted to
the Scottish Government in November 2022.  To address the need for affordable
housing the SHIP details potential sites for 2,594 new affordable homes to be
built during 2023-28.   During 2022/23 97 new Council Houses were completed,
this brings the total completed to 1,519 over the past 16 years, net of
demolitions and disposals. In addition, 28 properties were purchased during the
year to add to the overall housing stock. 
Financial Performance 2022/23 
Financial information is part of the Council’s Performance Management Framework with the General Fund
and Housing Revenue Account (HRA) financial performance regularly reported to Council.  This section
summarises our financial performance for 2022/23.  Full details of the Council’s financial performance were
reported to Council on 27 June 2023 and is available on the Council's website.
Page 65 of 260

Page 66

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 7 
Useable Reserves 
The Council holds funds in a number of Useable Reserves for various purposes.  Details of the balances
and prior year comparatives are shown in the table below, more detail can be found in the Movement in
Reserves Statement on Page 39: 
Useable Reserve Purpose 2022/23
£000
2021/22
£000
General Fund Non-Earmarked
Reserve
Funds held as a general contingency. 
Anticipated Settlement of VAT Claim.
9,877 
6,839
5,597 
0
General Fund Earmarked
Reserve
Funds held for specific purposes (note 8). 18,247 26,835
Housing Revenue Account Funds held for investment in the Council’s
housing stock.
32,143 28,084
Capital Fund Funds set aside for major capital developments
or asset purchases.
20,107 22,178
Repairs and Renewals Fund Funds held for specific types of repairs and
maintenance work.
4,138 3,718 
General Fund Performance 
The General Fund is a statutory fund into which all the receipts of the Council are required to be paid and
out of which all liabilities of the Council are to be met, except to the extent the statutory rules provide
otherwise.  Government grants, council tax income, fees and charges, non-domestic rates income (subject
to pooling arrangements) and interest/returns on investments provide resources for the General Fund. 
The General Fund is split between non-earmarked balances (the level of funding available to the Council to
manage financial risks and unplanned expenditure) and balances that are earmarked for specific purposes
(see note 8). 
Page 66 of 260

Page 67

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 8 
Actual outturns against budget for each of the Council’s General Fund Service areas as follows:
General Fund Revenue Outturn 2022/23   
Service Area
Revised Budget
£000
Net Expenditure
£000
(Under)/Overspend
£000
Management and Members 1,993 1,989 (4)
Place:   
Corporate Solutions 26,551 25,870 (681)
Place 40,266 38,694 (1,572)
Central Costs 118 294 176
People & Partnerships:   
Midlothian Integration Joint Board 56,612 56,612 (0)
Adult Health & Social Care – Non-
Delegated
2,115 (4,821) (6,936)
Children’s Services, Partnerships and
Communities (1)
19,044 18,025 (1,019)
Education 119,955 119,698 (257)    
Lothian Valuation Joint Boards 582 565 (17)
Non-distributable Costs 899 773 (126)
General Services Net Expenditure 268,135 257,699 (10,436)
Loan Charges 2,764 952 (1,812)
NDR Discretionary Relief  71 82   11
Investment Income (111) (34) 77
Allocations to HRA, Capital Account etc. (5,332) (5,146) 186
Total Expenditure 265,527 253,553 (11,974)
Less Funding   
Scottish Government Grant 195,092 195,435 (343)
Council Tax 58,496 58,580 (84)
Transfer from Housing Revenue Account 2,069 2,069 0
Utilisation of Reserves 9,870 (2,531) (11,547)    
General Fund Reserve (MIRS) (32,432) (2,531) (34,963)
(1) Includes Audit Adjustment of £0.770 million for Ukrainian Refugee Grant Funding Accrual.
The most significant areas contributing to the favourable variances against budget in Council service areas
were in relation to:
• Two claims with HMRC for overpaid VAT on sporting activities.  These date back to around 2009 and
have been the subject of ongoing legal debate until March 2023 when HMRC announced in Revenue
and Customs Brief 3 (2023) that Local Authorities’ leisure services are “provided under a statutory
framework and can be treated as non-business for VAT purposes”. The estimated net impact amounts
to £6.839 million and that figure is included in the 2022/23 accounts within the Adult Health and Social
Care – Non-Delegated Service figure in the above table; 
• Council Officers from Midlothian and the City of Edinburgh Council (CEC), as part of the joint
management and monitoring arrangements for the waste plant at Millerhill, have been working
through calculations for third party income due. In the financial year 2022/23 £0.879 million of
unbudgeted income was paid to Midlothian. Income projections for future years are included in
Medium Term Financial Strategy (MTFS) projections;
• A one-off receipt of income of £0.573 million was received in respect of agreed legal right of access
(servitude) across Midlothian Council land;
• Significantly higher surplus cash flow than expected linked to lower than planned spend on Capital
Programmes alongside a continued higher interest rate environment provided opportunity to
Page 67 of 260

Page 68

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 9 
generate a significantly higher return on short term deposits in 2022/23 than was anticipated when
the budget was set. Approved methodology for allocating Loan Charges between General Fund and
Housing Revenue Account results in the majority of this upside benefitting the General Fund. There is
an underspend of £1.813 million as shown in the Loan Charges line; 
• Midlothian Council provide Midlothian Integration Joint Board an annual sum for services now
managed by Midlothian Health and Social Care Partnership that were previously council managed.
This sum is adjusted in-year in accordance with the integration scheme. Detailed commentary on the
financial performance of the Midlothian Integration Joint Board is contained in their accounts.
Full details of all other variances affecting the Final Outturn position can be found in the 27 June Council
report Financial Monitoring 2022/23 - General Fund Revenue.
Summary Position
The Council approved the reserves strategy in February 2019 setting the minimum level of uncommitted
reserve of 2% of net expenditure (excluding resources delegated to Midlothian Integrated Joint Board),
which equates to £4.178 million.  In 2022/23 there was an increase of £2.531 million in the General Fund
Reserve comprising the £11.548 million underspend detailed above, planned utilisation of reserves of
£26.010 million, application of Business Transformation funding of £0.269 million and budgets to be carried
forward for use in 2023/24 of £17.262 million.  Further details are provided in the Movement in Reserves
Statement on Page 39.
Housing Revenue Account (HRA) Performance 
The Council has a statutory obligation to maintain a revenue account for its housing provision in accordance
with the Housing (Scotland) Act 1987.  The Housing Revenue Account records all income and expenditure
relating to the Council’s own housing stock.  Rents paid by tenants’ funds the revenue expenditure on
housing management, repairs and maintenance and in part financing of capital expenditure.  The table
below provides analysis of financial performance for 2022/23:  
Housing Revenue Account Outturn 2022/23
Revised
Budget
£000
Net Expenditure
£000
(Under)/Overspend
£000
Expenditure:   
Repairs & Maintenance 7,220 8,137 917
Administration and Management 5,332 5,146 (186)
Loan Charges 13,790 11,587 (2,203)
Other Expenses 2,898 3,236 338
Total Expenditure 29,240 28,106 (1,134)
Income:   
Council House Rents (31,950) (31,026) 924
Other Rents & Recharges (1,103) (1,139) (36)
Total Income (33,053) (32,165) 888
Net Expenditure (Income) (3,813) (4,059) (246)    
Reserve Movement Opening
Balance
Movement Closing Balance
HRA Reserve (28,084) (4,059) (32,143)
Total HRA Reserve (28,084) (4,059) 32,143 
Overall, the HRA showed favourable variances at the year-end due to re-phasing of the Capital Plan
resulting in reduced borrowing costs for the year of £2.203 million, offset by a reduction in the use of
temporary accommodation giving rise to increase in void repairs and reduced level of rents received of
£0.917 million and £0.924 million respectively.  The closing balance on the Housing Revenue Account
Page 68 of 260

Page 69

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 10 
reserve is £32.143 million, this is committed to fund the Council’s ambitious capital investment plan, which
currently runs to 2037/38, to build further new housing stock and continue to improve and upgrade its
existing stock, particularly through Scottish Housing Quality Standards (SHQS) improvement and Energy
Efficiency Standard for Social Housing (EESSH) works.  The majority of this plan is funded through prudential
borrowing with costs of borrowing met from rental income and planned utilisation of the HRA reserve,
which is projected to reduce to approximately £2 million by the end of the plan.
Reconciliation of General Fund and Housing Revenue Account Monitoring to the EFA 
The table below provides a reconciliation to assist users of the accounts to navigate from the Midlothian
Council Budget Monitoring position on page 8 to the first column in the Expenditure and Funding Analysis
(EFA) on page 42.  The Expenditure and Funding Analysis provides the link between the Final Outturn
reports and the figures in the Comprehensive Income and Expenditure Statement (CIES) by removing the
various statutory adjustments required under generally accepted accounting practices.
Final Outturn to EFA Reconciliation   
Service Area
Final Outturn
Net
Expenditure
£000
Internal
Reporting
Adjustments
(see table
below) 
£000
Figure
Reported in
EFA £000
Management and Members 1,989 (21) 1,968
Place:   
Corporate Solutions 25,870 (7,459) 18,411
Place 38,694 (2,938) 35,756
Central Costs 294 (84) 210
People & Partnerships:   
Midlothian Integrated Joint Board 56,612 0 56,612
Adult Health & Social Care – Non-Delegated (4,821) 0 (4,821)
Children’s Services, Partnerships and Communities 18,025 0 18,025
Education 119,698 (9,695) 110,003    
Lothian Valuation Joint Boards 565 0 565
Non-distributable Costs 773 0 773
Add Back:   
Housing Revenue Account 0 (15,957) (15,957)
Net Expenditure 257,699 (36,154) 221,545
Loan Charges 952 19,615 20,567
Investment Income (34) 0 (34)
Allocations to HRA, Capital Account etc. (5,146) 5,146 0
HRA Transfer (2,069) 2,069 0
NDR Discretionary Relief  82 (82) 0
Scottish Government Grant (195,435) 82 (195,353)
Council Tax (58,580) 5,265 (53,315)
Other Income and Expenditure (260,230) 32,095 (228,135)
Utilisation of Reserves (2,531) (4,059) (6,590) 
Page 69 of 260

Page 70

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 11 
Internal Reporting Adjustments     
Service Area
HRA
£000 
PPP
£000
Council Tax
Reduction
£000
Other 
£000
Total
£000
Management and Members (21) 0 0 0 (21)
Place:     
Corporate Solutions (2,172) 0 (5,265) (22) (7,459)
Place (2,641) (944) 0 647 (2,938)
Central Costs 0 0 0 (84) (84)
People & Partnerships:     
Education 0 (5,249) 0 (4,446) (9,695)
Add Back:     
Housing Revenue Account (15,957) 0 0 0 (15,957)
Net Expenditure (20,791) (6,193) (5,265) (3,905) (36,154)
Loan Charges 9,517 6,193 0 3,905 19,615
NDR Discretionary Relief  0 0 0 (82) (82)
Allocations to HRA, Capital
Account etc.
5,146 0 0 0 5,146
HRA Transfer 2,069 0 0 0 2,069
Scottish Government Grant 0 0 0 82 82
Council Tax 0 0 5,265 0 5,265
Other Income and Expenditure 16,732 6,193 5,265 3,905 32,095
Utilisation of Reserves (4,059) 0 0 0 (4,059) 
Capital Expenditure 2022/23 
Capital expenditure represents the money spent by the Council for buying, upgrading or improving assets
such as buildings and roads.  The difference between capital and revenue expenditure is that the Council
receives the benefit from capital expenditure over a period exceeding one year.  In 2022/23 the final budget
for General Services capital investment was £23.291 million (2021/22 £23.499 million), which was
overspent by £0.031 million.  The table below identifies actual capital spend during the financial year for
key projects: 
2021/22 2021/22  2022/23 2022/23
Revised
Budget
Actual
Spend 
Revised
Budget
Actual
Spend
£000 £000 General Fund Capital Spend £000 £000
6,071 5,831 School Estate  5,254 5,300
4,421 4,421 Roads, Pavements and Street Lighting 5,833 5,833
1,455 1,455 Fleet Replacement and Upgrades 1,911 1,911
6,294 6,294 Digital Assets 1,869 1,869
686 686 Centralised Property Upgrades 837 837
4,572 4,790 Other Capital Projects 7,587 7,572
23,499 23,477 Total Spend 23,291 23,322 
The table below demonstrates the breakdown of the Housing Revenue Account Capital Spend for 2022/23
Page 70 of 260

Page 71

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 12 
2021/22
Revised
2021/22
Actual 
2022/23
Revised
2022/23
Actual
Budget Spend  Budget Spend
£000 £000 Housing Capital Spend £000 £000
35,530 35,530 New Social Housing and Market
Purchases 
42,142 42,142
3,235 3,235 SHQS Improvement Works 8,785 8,785
2,005 2,134 Other Small Capital Projects 826 783
40,770 40,899 Total Spend 51,753 51,710 
A combination of government grants, external funding contributions from third parties, capital receipts,
Section 75 developer contributions and prudential borrowing funded this expenditure.  Note 32 in the
financial statements provides a full analysis of capital expenditure and the financing required.
Treasury Management and Investment 
The Council is able to regulate its own capital spending limits within a prudential framework recommended
by the Chartered Institute of Public Finance and Accountancy (CIPFA) and endorsed by Scottish
Government, provided it operates within a series of indicators.  The Council’s capital expenditure is a key
driver of treasury management activity, and these indicators are relevant for the purposes of establishing
an integrated treasury management strategy, which demonstrates that the Council’s capital investment
plans are affordable, prudent and sustainable.
Page 71 of 260

Page 72

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 13 
Financial Indicator 2021/22 2022/23 Commentary
Capital financing requirement –
underlying need to borrow
(excluding PFI/PPP/DBFM)
£307.247m £347.661m Reflects the Council’s underlying need to
borrow to finance capital expenditure
incurred historically by the Council that has
yet to be financed. 
Authorised Debt Limit £676.508m £472.662m This represents the maximum amount that
the authority may borrow and is set at a level
that reflects capital expenditure plans but
includes headroom to allow for unusual cash
movements, i.e., treasury management.
Actual external borrowing £323.271m £321.753m The actual external debt and long-term
liabilities position of the Council. The actual
figures should never exceed the Council’s
Authorised Debt Limits, which are calculated
in line with the requirements of the
Prudential Code for Capital Finance in local
authorities. 
Under/(Over) Borrowed £ (16.024)m £25.908m This demonstrates that the Council’s capital
borrowing requirement has not been fully
funded by loan debt and is using cash from
working capital to support capital
programmes whilst interest rates on long-
term fixed rate borrowing are high.
Ratio of finance costs to net
revenue stream – General Fund
1.08% 0.38% This is a measure of how affordable the
Council’s capital plans are.  It takes actual
finance costs as a % of net revenue spend.
The reduction in 2022/23 reflects the
application of a principal repayment holiday,
along with deposit interest receivable being
higher than expected due to the Council
holding higher than expected surplus cash
flow generated funds throughout the year,
thereby reducing the loans fund interest
charge to the General Fund.
Ratio of finance costs to net
revenue stream – HRA
38.27% 36.03% As above excluding loans fund principal
repayment holiday.
External Loans Fund Interest
Rate
3.22% 3.01% Average rate of interest paid on external
debt.
Internal Loans Fund Interest
Rate
2.98% 2.41% This combines the interest paid by the Council
on money borrowed, with the interest earned
by the Council on money invested, along with
other charges to arrive at a weighted average
‘loans fund rate’ figure for the council.   
The borrowing strategy is prepared in accordance with the Code of Practice on Treasury Management in
Local Authorities.  The majority of the Council’s borrowing comes from Public Works Loan Board (PWLB). 
Note 19 and Note 20 of the financial statements provides further details on the Council’s borrowing.
Balance Sheet 
The table below summaries the Council’s Balance Sheet as at 31 March 2023.  The Balance Sheet brings
together assets and liabilities, year-end balances, money owed to and by the Council and reserves.  More
information on the balance sheet is provided on page 40.
Page 72 of 260

Page 73

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 14 
31 March 23 31 March 22 Change 
£000 £000 £000
Long-term Assets 1,207,334 1,125,065 82,269
Current Assets 158,690 192,355 (33,665)
Current Liabilities (107,711) (102,024) (5,687)
Long-term Liabilities (418,029) (468,956) 50,927
Net Assets 840,284 746,440 93,844 
Movements in the net assets of the Council are attributed to:
Pension Obligation
The impact of the Local Government Pension Scheme and Scottish Teachers Superannuation Scheme on
the Council’s accounts have been disclosed in Notes 34 and 35 to the accounts.  As at 31 March 2023, the
Council’s share of Lothian Pension Fund showed a net pension asset of £188.463 million (2021/22 pension
liability £54.160 million).  However, under the International Financial Reporting Interpretations Committee
Standard 14 – The Limit of a Defined Benefit Asset (IFRIC 14) the actuary has calculated the net present
value of the future contributions of £154.671 million exceeds the value of the future service costs of
£143.449 million, a negative contribution.  As a result of this calculation, IFRIC 14 advises that no defined
benefit plan asset should be recognised in the Council’s Balance Sheet and there is no requirement to
recognise the £11.222 million difference as a liability, however, it is required to reflect the liability in
relation to present value of unfunded obligations of £7.8 million. 
Formal actuarial valuations are carried out every three years, where each employer’s assets and liabilities
are calculated on a detailed basis, using individual member data, for cash contribution setting purposes. 
The most recent formal valuation was March 2020 with the subsequent results based on a roll forward
from the formal valuation.  The movements in the pension valuation are due to a combination of:
• The net discount rate (discount rate net of CPI inflation) has significantly increased by 2.05%,
leading to a large gain on the balance sheet;
• A 0.25% decrease in the Pension and Salary Increase Rate assumption which has served to reduce
the Employer’s obligations, leading to a gain on the balance sheet;
• Longevity Assumptions have changed from the previous accounting period to reflect the latest
available mortality improvement table, serving to reduce the employer’s obligation and leading
to a gain on the balance sheet;
• An increase in obligations, resulting from applying the actual Pensions Increase Order for April
2023 of 10.1% to the benefits, which is significantly higher than the pension increase rate
assumption of 3.2% built into the obligations at the start of the accounting period, leading to a
loss on the balance sheet. 
Long-term Assets
Long-term Assets have increased in value by £82.269m. This is primarily related to continued investment
in new assets across the Council and increases in the value of our existing assets which have been revalued
as part of our five-year rolling revaluation programme.  Further details of these movements can be found
in Notes 14-17 of the annual accounts.
Current Assets – A reduction in short-term and liquid deposits within current assets to £115.776 million.
Long-term Liabilities – Long-term Borrowing 
Due to borrowing undertaken late in 2021/22, slower general services capital expenditure in 2022/23 and
a rising interest rate environment, no external borrowing was taken in 2022/23. 
Page 73 of 260

Page 74

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 15 
Risks and Uncertainties Facing the Council 
Like all local authorities Midlothian Council is facing a period of unprecedented change with many factors
affecting the need to adapt as an organisation.  These pressures on demand for Council services are only
likely to increase as it reacts to future challenges which have been exacerbated by the recent pandemic
and a growing cost of living crises.  Some of the challenges the Council face include:
Risk and Uncertainty Commentary
Continued Demographic
Pressures
Continued demographic pressures particularly around looked after children,
people with learning disabilities, elderly care and the significant population
growth in Midlothian. Increasing financial hardship is also expected due to the
cost-of-living crisis resulting in an increase in the level of poverty rates. These
pressures continue and present a considerable challenge to the Council in
both financing them and transforming services to improve ways of managing
some of the implications of these pressures.
Requirement to maintain
the physical condition of
major capital assets
The Council continues to monitor the impact on its capital programmes arising
from supply chain difficulties and rising inflation, resulting in longer lead times
and increased development costs.
Social Care Reform Although the Scottish Government proposal is still in the early stages, such a
major transformation will risk a diversion from tackling immediate challenges
within the Social Care sector.  There is still concern about the destination of
the policy and future of funding for Council’s.
Long-term impact on the
local economy following
the Covid-19 pandemic and
leaving the European Union
It is difficult to untangle the combined impacts of leaving the European Union
and Covid-19, however both have contributed to a supply shock leading to the
Council facing higher prices and shortages of key resources, particularly in the
construction and care sectors.  The Council remains uncertain about the long-
term effect of leaving the European Union and Covid-19 but are continuing to
monitor the impact on its services and citizens.
Climate Change The Council recognises that climate change is an urgent issue and has
committed to be carbon neutral by 2030, this is an ambitious target and will
require significant investment and resource to achieve this by the specified
deadline.
Financial Pressures Pay and other inflation and Scottish Government Grant Income projections
are critical areas of modelling given their overall significance and uncertainty. 
For 2022/23, and again for 2023/24, the Scottish Government published a
one-year budget and grant settlement. In May 2022 the Scottish Government
published a Resource Spending Review (RSR) which provided financial
planning parameters through to 2026/27. In respect of grant support to
Councils the RSR indicated that settlements would remain cash flat through
to 2025/26 with a small increase for 2026/27. This represents a challenging
outlook for local government with a real term’s reduction in grant income at
a time when costs and service demands continue to rise.   There are a number
of factors, which will continue to influence the actual level of grant support
the Council might expect for 2023/24 and beyond.  Among these will be a
range of economic factors which will influence the resources Scottish
Government has at its disposal, whether from the UK Government block grant
or through tax revenues directly controlled by Scottish Government.  The
other main factors will be the taxation and spending priorities of the Scottish
Government. 
Whilst an assessment of economic factors can be made at this time, based on various sets of published
information the impact of Scottish Government’s tax and spending priorities will only become apparent
when the Scottish Government’s 2024/25 budget is published later in 2023.
In February 2023 the Council set a balanced budget for 2023/24 which included a council tax increase of
5% for the financial year, use of one-off fiscal flexibilities relating to service concessions and a £1.166
million use of general reserve. In the context of reduced real terms external funding and growth in demand
Page 74 of 260

Page 75

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 16 
for services, the Council has a considerable challenge to ensure its future expenditure plans are financially
sustainable. Updated Medium Term Financial Strategy (MTFS) forecasts show a budget gap of £34.7 million
for the period of 2024/25 to 2028/29. Further infrastructure requirements, some of which will prove
essential, will increase the gap further.
How the Council Manages Risk 
Action Commentary
Service Risk Registers The service Risk Registers contain operational risks and are managed by each
Service Management Team.  The Risk Management Group provides further
scrutiny of service risks and significant risks are added to the corporate risk
register.
The Corporate Risk
Register
The Corporate Risk Register managed by the Corporate Management Team
provides assurance through scrutiny and challenge and ensures that the
significant risks facing the Council have been identified and effective treatment
actions are implemented.  The Corporate Risk Register is then submitted to
Audit Committee for approval which provides effective scrutiny and challenge
as part of the Council’s corporate governance arrangements.
Development of a
Medium-Term Financial
Strategy
The Council’s Long Term financial outlook highlights significant funding
pressure that the Council may face over the next few years.  On 21 Feb 2023
Council agreed a Medium Term Financial Strategy 2023/24-2027/28, which set
out budget projections for 2023/24-2027/28. A further iteration of the MTFS
was reported to Council on 27 June 2023, Midlothian Council Transformation
Blueprint, extending the period to 2028/29 and shows a budget gap over the
period of £34.7 million. Projections will continue to be refined on a regular
basis. The MTFS sets out cost projections for pay inflation, price inflation, debt
charges and the impact of demographic changes together with projections of
income. As a framework to address the financial challenge, a Transformation
Blueprint has been prepared and will be considered by Council on 27 June 2023.
The Blueprint contains Strategic Themes of Following the Money, 21st Century
Workforce, Commercialisation and Income Generation, Workplaces for the
Future and Multi-agency transformation. Within each theme sits a number of
individual projects phased over the next two financial years with eight
commencing in quarter 1 of 2023/24. Council will also continue to explore any
options to increase external funding including early discussion with the Scottish
Government on funding fast growing Councils. 
Looking Ahead 
Moving into 2023/24, the Council anticipates a continuation of focus towards medium and long-term
recovery following the pandemic.  As well as dealing with the impact on Council services, the Council will
be a key partner in helping our citizens, communities and businesses to recover from the harms that have
been caused and to providing support during the subsequent cost of living crisis.  The pandemic and cost
of living crisis will cause many as yet unseen harms, and Councils will be required to identify the anticipated
impacts as quickly as possible and put in place plans of action to address them and many of those plans
will require funding deployed towards that effort.
In addition, Midlothian Council also faces additional pressure being the fastest growing local authority in
Scotland, resulting in greater demand for services with future funding for Local Government. This is likely
to remain severely constrained due the impact of the pandemic, leaving the European Union, cost of living
crisis and uncertain levels of growth and productivity in the Scottish economy.  The Council’s Capital Plan
will also see further major investment in the following areas over the coming years:
Page 75 of 260

Page 76

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 17 
Capital Expenditure Commentary
School Infrastructure • Equipped for Learning Programme;
• Wide-ranging school building, extension and refurbishment programme;
• A replacement of Beeslack Community High School and refurbishment of
Penicuik High School;
• A new school campus proposed at Shawfair;
• Replacement schools for Mayfield Campus and Lasswade Primary.
Provision of Care Services A new care facility in Bonnyrigg which will provide accommodation for those
in need of high quality care.
Carriageway and footway
infrastructure
• Continuing investment in improved roads, footpaths and lighting across
Midlothian;
• As part of the Edinburgh and South East Scotland City Region Deal major
investment is also planned in the new A701 Relief Road and A702 link which
will support planned investment in new research and technology facilities
at Easter Bush.
Social Housing • A continuation of the new build housing programme and upgrading of
existing housing. 
The Council has recognised the need for a strategic step change in the form of the development, agreement
and implementation of a Medium-Term Financial Plan, mentioned earlier, together with the proposed
resource allocation measures that will enable the Council to balance revenue budgets for each financial
year.
The Council continues to regularly monitor its financial position and provide full financial updates to the
Council Management Team and the elected members as appropriate, including options on addressing any
new budget and spending pressures. This may include further use of reserves, reallocation of committed
reserves, changes to capital spend, opportunities available through review of the Loans Fund or other cost
savings. Management is continuing to liaise with Scottish Government and COSLA on ensuring sustainable
funding going forward.
The Council will continue to assess the potential impact of the external risks and challenges facing the
Council, including the possible financial and economic impacts. From a financial perspective, the potential
impact on future Scottish Government grant funding levels, and from an economic perspective, the
potential lack of skilled resource and the impact on the local economy.
In delivering services, it is important to recognise that people are our most important asset.  Our people
have the potential to have a positive impact every day and can deliver life-changing impacts for our
communities.  Therefore, to maximise that positive impact, it is imperative that we work as One Council by
removing any institutional barriers; and eliminate silo working to enable the organisation to implement
simple solutions which make a big difference.  This means placing our citizens and communities at the
centre of our daily work; growing our own talent and empowering our staff and thereby enabling
Midlothian to fulfil its potential as a ‘Green Great Place to Grow’.
Conclusion 
The Council had to deal with the continuing impacts of a global pandemic as well as long-standing and
growing demographic pressures and a growing cost of living crisis resulting in increasing pressures on
Council resources and demand for its services. External funding is not growing in line with cost pressures
thus increasing the challenge to reach long-term financial stability. Despite these pressures, the Council
made significant improvements across a range of areas and the Council continued to invest for the future
in its asset base to provide essential infrastructure to support the growing population and it is important
to appreciate these improvements.  
Page 76 of 260

Page 77

Management Commentary   
WWW.MIDLOTHIAN.GOV.UK 18 
We have concluded the year in a period of unprecedented uncertainty but with a focus on meeting the
financial and service challenges identified in the Medium-Term Financial Strategy and Transformation
BluePrint to ensure the Council has longer term financial sustainability.
Acknowledgements 
I would like to acknowledge the tremendous effort in producing the Annual Accounts and express my
thanks to my own team and to colleagues throughout the Council for the significant dedication and
commitment shown throughout the year in financial matters. 
_____________________  _____________________ _____________________
David Gladwin    Dr Grace Vickers   Councillor Kelly Parry
Chief Financial Officer   Chief Executive   Leader of the Council       
Page 77 of 260

Page 78

Statement of Responsibilities   
WWW.MIDLOTHIAN.GOV.UK 19 
Statement of Responsibilities 
The Council’s Responsibilities
The Council is required to:
• Make arrangements for the proper administration of its financial affairs and to secure that one of its
officers has the responsibility for the administration of those affairs.  In this Council, that officer is the
Chief Financial Officer;
• Manage its affairs to secure economic, efficient and effective use of resources and safeguard its assets. 
I certify that the Annual Accounts have been approved for signature by, or on behalf of, the authority. 
___________________________
Councillor Kelly Parry
Leader of the Council
Date: 
The Chief Financial Officer Responsibilities
The Chief Financial Officer is responsible for the preparation of the Council’s Annual Accounts in
accordance with proper practices as required by legislation and as set out in the CIPFA/LASAAC Code of
Practice on Local Authority Accounting in the United Kingdom (the code).
In preparing these Annual Accounts, the Chief Financial Officer has:
• Selected suitable accounting policies and then applied them consistently;
• Made judgements and estimates that were reasonable and prudent;
• Complied with the local authority code;
• Kept proper accounting records, which were up to date;
• Taken reasonable steps for the prevention and detection of fraud and other irregularities.
I certify that the financial statements present a true and fair view of the financial position of the Council
(and its group) at the reporting date and the transactions of the Council (and its group) for the year ended
31 March 2023. 
___________________________
David Gladwin
Chief Financial Officer
Page 78 of 260

Page 79

Annual Governance Statement   
WWW.MIDLOTHIAN.GOV.UK 20 
Annual Governance Statement
Introduction
The Annual Governance Statement explains how the Council has complied with the terms of the
CIPFA/SOLACE Framework (2016) for the year ended 31 March 2023, sets out the Council’s governance
arrangements and systems of internal control, and reports on their effectiveness. The statement also
covers relevant governance matters as they affect those entities included as part of the Council’s Group
Accounts.
Scope of Responsibility 
Midlothian Council is responsible for ensuring that its business is conducted in accordance with the law
and proper standards, and that public money is safeguarded and properly accounted for. The Council also
has a statutory duty of Best Value under the Local Government in Scotland Act 2003 to make arrangements
to secure continuous improvement and performance, while maintaining an appropriate balance between
quality and cost; and in making these arrangements and securing that balance, to have regard to economy,
efficiency and effectiveness.
In discharging this overall responsibility, elected members and senior officers are responsible for putting
in place proper arrangements for the governance of Midlothian Council’s affairs and facilitating the exercise
of its functions in a timely, inclusive, open, honest and accountable manner. This includes the following:-
• setting the strategic direction, vision, culture and values of the Council; 
• effective operation of corporate systems, processes and internal controls; 
• engaging with and, where appropriate, lead communities;
• monitoring whether strategic objectives have been achieved and services delivered cost
effectively; and 
• ensuring that appropriate arrangements are in place for the management of risk.
The system can only provide reasonable and not absolute assurance of effectiveness.
Framework for Good Governance
The overall aim of the CIPFA/SOLACE Framework ‘Delivering Good Governance in Local Government’
(2016) is to ensure that: resources are directed in accordance with agreed policy and according to priorities;
there is sound and inclusive decision making; and there is clear accountability for the use of those resources
in order to achieve desired outcomes for service users and communities.
The Framework defines the seven core principles of good governance, namely:
A.  Behaving with integrity, demonstrating strong commitment to ethical values, and respecting the rule
of law;
B.  Ensuring openness and comprehensive stakeholder engagement;
C.  Defining outcomes in terms of sustainable economic, social, and environmental benefits;
D.  Determining the interventions necessary to optimise the achievement of the intended outcomes;
E.  Developing the entity’s capacity, including the capability of its leadership and the individuals within
it;
F.  Managing risks and performance through robust internal control and strong public financial
management; and
G.  Implementing good practices in transparency, reporting, and audit to deliver effective
accountability.
Page 79 of 260

Page 80

Annual Governance Statement   
WWW.MIDLOTHIAN.GOV.UK 21 
The Council’s Local Code of Corporate Governance, which is consistent with the principles and
recommendations of the CIPFA/SOLACE Framework and the supporting guidance notes for Scottish
authorities (November 2016) and was approved by Council in March 2021.
The Council’s Governance Framework 
The key elements of the Council’s governance arrangements, as set out in the Council’s Local Code of
Corporate Governance, include:
A. Behaving with integrity, demonstrating strong commitment to ethical values, and respecting rule of law
The roles and responsibilities of elected members and officers and the processes to govern the conduct of
the Council’s business are defined in standing orders and scheme of delegation for officers, scheme of
administration, and financial regulations.
Codes of conduct are in place for and define the high ethical values and standards of behaviour expected
from elected members and officers to make sure that public business is conducted with fairness and
integrity.
The Monitoring Officer is responsible for ensuring that agreed procedures are followed and that all
applicable statutes and regulations are complied with. The Standards Committee is responsible for dealing
with matters relating to conduct and ethical standards.
The Council seeks feedback from the public through its complaints and comments procedures for
Corporate and Social Work (statutory) service areas, responds to the outcomes, as appropriate, and reports
the results annually.
Professional advice on the discharge of statutory social work duties was provided during the year to the
Council by the Chief Officer Children’s Services, Partnerships and Communities (Chief Social Work Officer).
The CSWO promotes values and standards of professional practice and acts as the 'agency decision maker'
taking final decisions on a range of social work matters including adoption, secure accommodation,
guardianship, etc. The CSWO reports annually on the statutory work undertaken, regulation and
inspection, workforce issues and significant social policy themes.
B. Ensuring openness and comprehensive stakeholder engagement
Council meetings are held in public unless there are good reasons for not doing so on the grounds of
confidentiality. When Council and Committee meetings are held using a virtual platform, they are live-
streamed to ensure public access, and recordings can be accessed from the Council’s website.
Unless confidential, decisions made by Council or other Committees are documented in the public domain.
All decisions are explicit about the criteria, rationale and considerations used. The impact and
consequences of all decisions are clearly set out.
The Council seeks community views on a wide range of issues and undertakes regular consultation and
engagement with citizens and service users.
C. Defining outcomes in terms of sustainable economic, social, and environmental benefits
The Council’s vision, strategic objectives and priorities are set out in the Single Midlothian Plan developed
through the Community Planning Partnership (of which the Council is a partner). The Council’s Medium
Term Financial Strategy and Service Plans outline how Midlothian Council will deliver its contribution to
the Single Midlothian Plan.
Capital investment at a strategic level is structured to consider and balance the combined economic, social
and environmental impact of policies and plans when taking decisions about service provision. Asset
management planning is being developed to support this.
The Council supports community empowerment and recognises the importance of building community
capacity and volunteering as a key factor in building stronger, safer, and supportive communities. 
Page 80 of 260

Page 81

Annual Governance Statement   
WWW.MIDLOTHIAN.GOV.UK 22 
Implications are considered during the decision-making process within the standard report template
covering Resources, Risk, Single Midlothian Plan and Key Priorities, Impact on Performance and Outcomes,
Adopting a Preventative Approach, Involving Communities and Other Stakeholders, Ensuring Equalities,
Supporting Sustainable Development, and IT issues.
D. Determining the interventions necessary to optimise the achievement of the intended outcomes
Decision makers receive detailed information indicating how intended outcomes would be achieved
together with the risks, financial and other implications associated with the proposals, by way of the
compulsory sections of the Committee report template.
In determining how services and other courses of action should be planned and delivered the Council is
increasingly engaging with internal and external stakeholders. The Council fosters effective relationships,
collaborative working and contractual arrangements with other public, private, and voluntary
organisations in delivering services that meet the needs of the local community including the achievement
of ‘social value’ (community benefits) through service planning and commissioning.
E. Developing the entity’s capacity, including the capability of its leadership and the individuals within it
The roles of officers are defined in agreed job descriptions. Staff performance is reviewed on an annual
basis in accordance with the relevant appraisal processes in place during the year.
The Chief Executive is responsible and accountable to the Council for all aspects of management including
promoting sound governance, providing quality information/support to inform decision making and
scrutiny, supporting other statutory officers, and building relationships with all Councillors.
The Elected Members Induction Programme took place following elections in May 2022 and is periodically
supplemented by training events, seminars and briefings. Members appointed to certain committees have
also received specific training related to the responsibilities on these committees e.g., licensing, planning,
audit.
F. Managing risks and performance through robust internal control & strong public financial management
The Council has overall responsibility for directing and controlling the organisation. The Cabinet is the
principal decision-making committee of the Council. The Performance Review and Scrutiny Committee is
responsible for reviewing performance against policy objectives and commenting on decisions and policies
and their impact.
The Council is refreshing its risk management policy and approach whose main priorities are the robust
systems of identification, evaluation and control of risks which threaten the Council’s ability to meet its
objectives to deliver services to the public.
The Acting Chief Financial Officer (the Section 95 officer) is responsible for the proper administration of all
aspects of the Council’s financial affairs including ensuring appropriate advice is given to the Council on all
financial matters. 
The Council’s system of internal financial control is based on a framework of financial regulations (updated
in June 2022), regular management information, administrative procedures (including segregation of
duties), management supervision and a system of delegation and accountability.
The Council has an approved strategy to tackling fraud, theft, corruption and crime, as an integral part of
protecting public finances, safeguarding assets, and delivering services effectively.
A Medium-Term Financial Strategy was approved by Council in June 2019. The 2022/23 budget was
approved by Council in February 2022. Given the significant fiscal challenges which lie ahead, work is
ongoing to agree the Council’s Blueprint/Strategic Plan, aligned to the Medium-Term Financial Strategy.
This will then inform the revised service plans, workforce plans and the long-term sustainability of services.
Current assessment of a budget gap of approximately £29.121 million for the Council over the next 5 years,
Page 81 of 260

Page 82

Annual Governance Statement   
WWW.MIDLOTHIAN.GOV.UK 23 
coupled with the current rate of inflation, will place unprecedented financial pressure on the Council which
will require difficult decisions to be made in relation to both Capital and Revenue Budgets.
The previous Chief Officer Corporate Solutions carried out a self-assessment against the CIPFA FM code
and reported the findings of this to CMT in September 2021 and this was subsequently reported to Audit
Committee in December 2021.  The Chief Officer Corporate Solutions identified six areas requiring
improvement from his review of the CIPFA FM code.  Actions identified included improving the resourcing
of the Procurement team (Ongoing), updating the Council’s Financial Regulations and Directives (Complete
– approved at June 2022 Council), putting in place a multi-year financial plan (Ongoing – action relevant to
two sections of the FM Code), improving the Council’s approach to lessons learned from completed
projects (Ongoing), and improving the Council’s risk management arrangements (Ongoing). No further
Committee update has been provided within the 2022/23 financial year.   
Revenue and Capital Budget Monitoring reports are presented to the Council on a quarterly basis for
monitoring and control purposes including the annual outturn. The Management Commentary in the
Statement of Accounts provides financial and other performance information regarding the operation of
the Council, its wider achievements and areas for development.
G. Implementing good practices in transparency, reporting, & audit to deliver effective accountability
The independent and objective audit opinion of the Chief Internal Auditor (Chief Audit Executive) is stated
within the Internal Audit Annual Assurance Report 2022/23. This is based on work carried out by an in-
house team, with supplementary support from an outsourced partner, including shared services resources
(from January to June 2023), in conformance with the Public Sector Internal Audit Standards to fulfil
statutory Internal Audit provision.
The Council responds to the findings and recommendations of Internal Audit, External Audit, Scrutiny and
Inspection bodies including associated Action Plans for improvement. The Audit Committee is integral to
overseeing independent and objective assurance and monitoring improvements in internal control and
governance.
Quarterly Performance Reports were presented to the Performance, Review and Scrutiny Committee for
monitoring the achievement of strategic priorities and key performance indicators.
The Annual Accounts sets out the financial position in accordance with relevant accounting regulations.
Review of Adequacy and Effectiveness of the Council’s Governance Framework
An annual review of the adequacy and effectiveness of the Council’s overall governance framework has
been carried out, taking into account the ongoing recovery from the Covid-19 pandemic impact in 2022/23
on business as usual in the delivery of services and in person and virtual committee meetings to enable
decision-making. The output is this Annual Governance Statement which is presented to the Audit
Committee.
The review was further informed by assurances from: assessment of compliance against the Local Code;
written assurance statements from the Executive Directors; Internal Audit annual opinion, findings and
recommendations; External Audit, and comments and recommendations made by External Auditor and
other external scrutiny bodies and inspection agencies.
In respect of the implementation of the remaining Best Value Audit Actions (nos. 1-4 improvement areas
of governance identified by the Council in 2020/21), a Best Value Assurance Update Report by the Chief
Executive was presented to Council in June 2021. This set out further progress to address the
recommendations made in order to demonstrate Best Value. These actions are now all materially
completed. The Council however recognises improvements are required in the areas presented below. 
Page 82 of 260

Page 83

Annual Governance Statement   
WWW.MIDLOTHIAN.GOV.UK 24 
Improvement Areas of Governance
The collective review activity outlined above has identified the following areas where improvement in
governance arrangements can continue to be made to enhance compliance with the Council’s Local Code
of Corporate Governance and to demonstrate Best Value:
1) The previous Chief Officer Corporate Solutions carried out a self-assessment against the CIPFA FM
code and reported the findings of this to CMT in September 2021 and this was subsequently reported
to Audit Committee in December 2021. One of the actions identified was putting in place a multi-year
financial plan. Work is ongoing to agree the Council’s Blueprint/Strategic Plan, aligned to the
Medium-Term Financial Strategy. This will then inform the revised service plans, workforce plans and
the long-term sustainability of services. Current assessment of a budget gap of approximately £30
million for the Council over the next 5 years coupled with the current rate of inflation requires putting
in place an approved multi-year financial plan key to developing the Council on a sustainable basis.
Dedicated Financial Management CMT meetings have been implemented on a quarterly basis to
challenge and scrutinise budgets in order to improve financial discipline.
2) The Procurement Service is undergoing a service review and the Procurement Manager post is
currently vacant and the recruitment process is underway. The Legal and Governance Manager is
overseeing this service providing a level of assurance and compliance in the absence of the
Procurement Manager. Issues arising from the reduced team capacity are the off contract spend and
non-contracted spend within the organisation. Expired contracts and off contracts spend is being
managed through regular review at Budget Boards who work to ensure that the risk is managed and
the appropriate remedial action is being taken; with oversight from the Executive Director and Chief
Officers. In addition as part of the Council’s Blueprint under theme1 follow the money a sprint looking
at contract management and a review of transport is being progressed. 
3) Capital Plan Affordability review continues as the paper that was approved by Council on 21 February
2023, detailed that the Loan Charges arising from capital expenditure within the General Services
Capital Plan, including planned Learning Estate Programme projects that are under development is
expected to significantly exceed the Loan Charges levels as per the Council’s approved Medium Term
Financial Strategy over the period 2023/24 to 2027/28. The paper considered by Council approved
the deferral, pause or deletion of £10.604 million of capital expenditure, against a target of £71.901
million (the level required to bring Loan Charges within the Medium-Term Financial Strategy targets).
Therefore, a further £61.297 million of capital expenditure from fully approved projects and ‘in
principle’ projects still needs to be deleted from, paused or deferred within the General Services
Capital Plan. Work Continues to establish an approved affordable and financially sustainable Capital
Plan for the Council moving forward.  
4) Workforce planning to address recruitment, retention and resilience is taking place. The approach to
Organisational Development is under review with the addition of a new OD post. A revised OD
programme will be delivered in 2023 and the Wellbeing Strategy is being reviewed and refreshed in
response to managing absence, following the impacts of the pandemic. 
Page 83 of 260

Page 84

Annual Governance Statement   
WWW.MIDLOTHIAN.GOV.UK 25 
Conclusion and Opinion on Assurance 
The conclusion from the review activity completed and subject to the successful progression of the areas
for improvement highlighted above, our opinion is that reasonable assurance can be placed upon the
adequacy and effectiveness of Midlothian Council’s systems of governance, risk management and internal
control. Although areas for further improvement have been identified, the annual review demonstrates
sufficient evidence that the Council’s Local Code of Corporate Governance is operating effectively and that
the Council complies with that Local Code in most respects to meet its principal objectives. Systems are in
place to regularly review and improve governance arrangements and the system of internal control. 
_______________________ ______________________
Dr Grace Vickers Kelly Parry
Chief Executive Leader of the Council 
Page 84 of 260

Page 85

Remuneration Report   
WWW.MIDLOTHIAN.GOV.UK 26 
Remuneration Report 
Introduction 
The Local Authority Accounts (Scotland) Regulations 2014 require local authorities in Scotland to prepare
a Remuneration Report as part of the annual statutory accounts.
The following report details Midlothian Council’s remuneration policy for its senior councillors and senior
employees, providing full details of the remuneration and pension benefits they receive.  This report also
provides information on the number of employees whose annual remuneration was £50,000 or more as
well as summary information in relation to employees’ exit packages agreed during the year.
Information disclosed in the tables in this report is subject to audit by Audit Scotland to report on whether
that information has been properly prepared in accordance with the Local Authority Accounts (Scotland)
Regulations 2014 (with the exception of the table in note 4.4). All other sections of the Remuneration
Report, including the table in respect of Trade Union Facility Time, are read and considered to identify any
material inconsistencies with the financial statements.
Remuneration of Councillors 
The remuneration of Councillors is regulated by the Local Governance (Scotland) Act 2004 (Remuneration)
Regulations 2007 (SSI No 2007/183) as amended.  The Regulations provide for the grading of councillors
for the purposes of remuneration arrangements, as Leader of the Council, Provost, Senior Councillors or
Councillors.  The Leader of the Council and the Provost cannot be the same person for the purposes of
payment of remuneration.  A Senior Councillor is a Councillor who holds a significant position of
responsibility within the Council’s political structure.
The Regulations permit the Council to remunerate one Leader of the Council and one Provost.  For 2022/23
the Regulations set the salary for the Leader of Midlothian Council £32,622 (2021/22 £31,010) and the
salary for the Provost was set at £24,467 (2021/22 £23,257), the maximum level.
The Regulations also set out the remuneration that may be paid to Senior Councillors and total number of
Senior Councillors the Council may have.  The maximum yearly amount that may be paid to a Senior
Councillor is 75% of the total yearly amount payable to the Leader of the Council. For 2022/23, the
maximum salary which could be paid to a Senior Councillor was £24,467 (2021/22 £23,257) with the
maximum number of Senior Councillors set at eight (excluding the Provost and the Leader).  The total
remuneration for Senior Councillors (excluding the Provost and the Leader) should not exceed £176,150
(2021/22 £167,446).  The Council is able to exercise local flexibility in the determination of the precise
number of Senior Councillors and their salary within these maximum limits.
The Regulations also permit the Council to pay contributions or other payments as required to the Local
Government Pension Scheme in respect of those Councillors who elect to become Councillor Members of
the pension scheme.
In addition to the Senior Councillors of the Council, the regulations also set out the remuneration payable
to Councillors with the responsibility of a Convener or a Vice-Convener of a Joint Board.  The Regulations
require the remuneration and any pension contributions, if a member of the Local Government Pension
Scheme, to be paid by the Council of which the Convener and Vice-Convener is a member.  The Council is
reimbursed by the Joint Board for any additional remuneration paid to a member from being a Convener
or Vice-Convener of a Joint Board.
Page 85 of 260

Page 86

Remuneration Report   
WWW.MIDLOTHIAN.GOV.UK 27 
Local elections took place on the 5 May 2022, Special Council on 24 May 2022 approved an SNP
administration with an SNP Council Leader, Kelly Parry. Details of the Remuneration of Council Leader,
Provost and Senior Councillors are shown in the table below:
Councillor Name and Responsibility Salary  Expenses
Total
Remuneration
2022/23
Total
Remuneration
2021/22
Senior Councillor (May 22-Mar 23) post-election    
K Parry: Council Leader (1) £30,728 £30 £30,758 n/a
D McCall: Provost (2) £23,756 £125 £23,881 n/a
D Virgo: Group Leader (3)  £19,676 £148 £19,824 n/a
D Alexander: Cabinet Member (3) £21,664 £162 £21,826 n/a
D Bowen: Cabinet Member (3,5) £19,770 £76 £19,846 n/a
E Scott: Cabinet Member (3) £19,770 £76 £19,846 n/a
S McKenzie: Cabinet Member (3)  £21,664 £15 £21,679 n/a
Senior Councillor (Apr 22–Mar 23)        
D Milligan: Group Leader (3,4) £22,927 £262 £23,189 £31,484
R Imrie: Cabinet Member (3) £21,996 £190 £22,186 £23,590
C Cassidy: Depute Leader and Group Leader (3) £22,138 £36 £22,174 £6,052
Senior Councillor (Apr-May 22) pre-election        
J Muirhead: Depute Leader (3) £2,368 £3 £2,371 £23,287
P Smaill: Provost and Group Leader (2) £3,736 £47 £3,783 £23,471
M Russell: Depute Provost (3) £3,736 £27 £3,763 £23,386
S Curran: Cabinet Member (3) £3,736 £0 £3,736 £23,257
J Hackett: Cabinet Member (3) £2,368 £0 £2,368 £23,257
Total £240,033 £1,197 £241,549 £177,784 
Notes
(1) FYE of Council Leader £32,622;
(2) FYE of Provost £24,467;
(3) FYE of Senior Councillor £22,019, D Milligan and C Cassidy higher due to holding Council Leader
and Group Leader role between April to May 22;
(4) Pre-election Council Leader to May 2022;
(5) On 21 Mar 2023 D Bowen resigned as Cabinet Member and assumed the role of Depute Provost,
the vacant Cabinet post was subsequently filled by C McManus.
The total remuneration of all the Council’s elected members (including Senior Councillors above) and
including all business expenses for 2022/23 was £0.391 Million (2021/22 £0.382 million).  Detailed figures
for these costs are available on the Council’s website, members' remuneration details for 2022/23.
Remuneration of Employees 
The salary of senior employees is set by reference to national arrangements.  The Scottish Joint Committee
(SJC) for Local Authority Services sets the salaries for the Chief Executives of Scottish Local Authorities.  The
salaries of the Executive Directors, Chief Officers and Heads of Service are all now based on a fixed
percentage of the Chief Executives salary.
The salaries of all other employees are set by reference to:
• Teaching staff – The Scottish Negotiating Committee for Teachers (SNCT);
• Other staff – The Scottish Joint Committee (SJC).
The table overleaf details the remuneration paid to Senior Employees (as defined in the regulations) of the
Council during the financial year:
Page 86 of 260

Page 87

Remuneration Report   
WWW.MIDLOTHIAN.GOV.UK 28 
Senior Employee Name and Responsibility
Total Salary, Fees
and Allowances
2022/23
Total
Remuneration
2021/22
Full Year (Apr 22-Mar 23)  
G Vickers: Chief Executive  £125,540 £119,762
G Vickers: Returning Officer £3,007 £1,732
M Barrow: Joint Director: Health and Social Care (1) £52,699 £53,805
K Anderson: Executive Director: Place   £109,715 £104,690
F Robertson: Executive Director: Children, Young People and
Communities  £109,715 £104,690
J Tranent: Chief Officer: Children’s Services, Partnerships and
Communities (Chief Social Work Officer) £92,738 £89,022
A Turpie: Legal Services Manager (Monitoring Officer) £70,312 £65,776
Part-Year     
G Fairley: Chief Officer: Corporate Solutions (S95 Officer) (2)  £59,479 £88,522
D Gladwin: Chief Financial Officer (S95 Officer) (3) £81,928 n/a
Total £705,133 £627,999 
Notes
(1) Post joint funded with NHS Lothian, M Barrow Full time Equivalent £105,397;
(2) G Fairley in post Apr 22 – Oct 22, FYE £88,322;
(3) D Gladwin Acting up 50% in Post between Oct 22 – Mar 23, FYE £88,322.  This figure also includes
salary for his substantive post.
Subsidiary Entities
None of our subsidiaries have remunerated employees.
Pension Benefits 
Pension benefits for Councillors and local government employees are provided through the Local
Government Pension Scheme (LGPS), which is administered by the Lothian Pension Fund.  From 1 April
2015, this became a career average salary pension scheme, although it was a final salary scheme until that
date. This means that pension benefits are based on an average of the pay over the number of years that
a person has been a member of the scheme.
From 1 April 2009, a five-tier contribution system is in place with contributions from scheme members
based on how much pay falls into each tier.  This is designed to give more equality between costs and
benefits of scheme membership.  Part-time workers contribution rates are worked out on the whole time
pay rate for the job, with actual contributions paid on actual pay earned.
The tiers and contribution rates are as follows:
Pensionable Pay 2022/23
Contribution
Rate
On earnings up to and including £23,000 5.5%
On earnings above £23,001 and up to £28,100 7.25%
On earnings above £28,101 and up to £38,600 8.5%
On earnings above £38,601 and up to £51,400 9.5%
On earnings above £51,401 12% 
Page 87 of 260

Page 88

Remuneration Report   
WWW.MIDLOTHIAN.GOV.UK 29 
There is no automatic lump sum on retirement.  Pension scheme members may opt to commute pension
for a lump sum payment up to the limits set by the Finance Act 2004.  The rate and basis at which employees
accrue their pension benefits has changed over time, this is shown in the table below: 
Pension Benefit Pension Benefit 
Time Period Accrual Basis Accrual Rate Lump Sum Basis
From 1 April 2015 Career Average 1/49th pensionable pay each year n/a
From 1 April 2009 to 31
March 2015
Final Salary 1/60th pensionable pay each year n/a
Prior to 1 April 2009 Final Salary 1/80th pensionable pay each year 3/80th final pensionable
salary and years of
pensionable service 
The value of accrued benefits has been calculated on the basis of the age at which the person will become
first entitled to receive a pension on retirement without reduction on account of its payment at that age,
without exercising any option to commute pension entitlement into a lump sum, and without any
adjustment for the effects of future inflation.
The pension entitlements for Senior Councillors for the year to 31 March 2023 are shown in the tables
below, together with the contribution made by the Council to each Senior Councillor’s pension during the
year.
Senior Councillors In-Year Pension Contributions
Councillor Name and Responsibility
Year to 31
Mar 2023
Year to 31
Mar 2022 
Senior Councillor (May 22-Mar 23) post-election   
K Parry: Council Leader (1) £6,822 n/a
D McCall: Provost (2) £5,274 n/a
D Virgo: Group Leader (3)  £4,368 n/a
D Alexander: Cabinet Member (3,4) £631 n/a
D Bowen: Cabinet Member (3,5) £4,388 n/a
E Scott: Cabinet Member (3,5) £4,388 n/a
S McKenzie: Cabinet Member (3,5) £4,809 n/a
Senior Councillor (Apr 22–Mar 23)   
R Imrie: Cabinet Member  (3) £4,883 £5,163
C Cassidy: Depute Leader and Group Leader (3) £4,915 £1,344
Senior Councillor (Apr-May 22) pre-election   
S Curran: Cabinet Member (3) £829 £5,163
J Hackett: Cabinet Member (3) £526 £5,163
Total £41,833 £16,833 
Notes
(1) FYE of Council Leader £7,242;
(2) FYE of Provost £5,432;
(3) FYE of Senior Councillor £4,888, C Cassidy due to holding Group Leader Role between Apr-May 22;
(4) Opted out of pension scheme May 2022;
(5) Less than two years’ service therefore no pension liability which would subsequently be reflected
in the accrued benefits table below. 
Page 88 of 260

Page 89

Remuneration Report   
WWW.MIDLOTHIAN.GOV.UK 30 
Senior Councillors Accrued Pension Benefits 
Pension at 31
March 2023
Lump Sum at 31
March 2023
Pension
Difference from
31 March 2022
Lump Sum
Difference from 31
March 2022
Senior Councillor £000 £000 £000 £000
K Perry 4 0 0 0
D McCall 3 0 0 0
D Alexander 2 0 0 0
C Cassidy 3 0 1 0
R Imrie 7 2 1 0
S Curran 3 0 1 0
J Hackett 2 0 0 0
Total 24 2 3 0 
The pension entitlements for Senior Employees for the year to 31 March 2023 are shown in the tables
below, together with the contribution made by the Council to each Senior Employees (as defined in the
regulations) pension during the year.
Senior Employees In-Year Pension Contributions
Senior Employee Name and Responsibility
Year to 31 March
2023
Year to 31 March
2022
Full Year (Apr 22-Mar 23)  
G Vickers: Chief Executive  £28,537 £26,971
M Barrow: Joint Director: Health and Social Care (1) £3,097 £0
K Anderson: Executive Director: Place   £24,357 £23,240
F Robertson: Executive Director: Children, Young People and
Communities  £24,357 £23,240
J Tranent: Chief Officer: Children’s Services, Partnerships and
Communities (Chief Social Work Officer) £20,588 £19,646
A Turpie: Legal Services Manager (Monitoring Officer) £15,609 £14,601
Part-Year    
G Fairley: Chief Officer: Corporate Solutions (S95 Officer)  £13,153 £19,651
D Gladwin: Chief Financial Officer (S95 Officer)  £18,188 n/a
Total £147,886 £127,349
Notes
1 Post joint funded with NHS Lothian, M Barrow Full time Equivalent £6,194.
Senior Employees Accrued Pension Benefits 
Pension at 31
March 2023
Lump Sum at 31
March 2023
Pension
Difference from
31 March 2022
Lump Sum
Difference from 31
March 2022
Senior Employee £000 £000 £000 £000
G Vickers 19 0 4 0
M Barrow 9 19 (12) (35)
K Anderson 65 109 6 5
F Robertson 13 0 3 0
G Fairley 50 85 1 0
D Gladwin 38 51 0 0
J Tranent 38 43 4 2
A Turpie 38 58 4 3
Total 270 365 10 (25)
All senior employees (as defined in the regulations) shown in the tables above except M Barrow are
members of the Local Government Pension Scheme.  M Barrow is employed by NHS Lothian and is a
Page 89 of 260

Page 90

Remuneration Report   
WWW.MIDLOTHIAN.GOV.UK 31 
member of the NHS pension scheme.  The pension figures shown relate to the benefits accrued as a
consequence of total local government service, not solely on the current appointment.
Remuneration of Other Employees by Pay Bands 
The Regulations require the Remuneration Report to provide information on the number of persons whose
remuneration was £50,000 or above, this information is detailed in bands of £5,000 in the table below:
Total
Employees 
Non-Teaching
Employees
Teaching
Employees
Total
Employees
2021/22 Remuneration Band 2022/23 2022/23 2022/23
86 £50,000-£54,999 28 51 79
73 £55,000-£59,999 14 78 92
24 £60,000-£64,999 13 33 46
20 £65,000-£69,999 7 13 20
4 £70,000-£74,999 6 5 11
4 £75,000-£79,999 2 2 4
1 £80,000-£84,999 0 2 2
5 £85,000-£89,999 1 2 3
0 £90,000-£94,999 4 0 4
1 £95,000-£99,999 0 2 2
2 £100,000-£104,999 0 0 0
0 £105,000-£109,999 2 0 2
1 £120,000-£124,999 0 0 0
0 £130,000-£134,999 1 0 1
221 Total 78 188 266 
Exit Packages 
Termination benefits are amounts payable because of a decision by the Council to terminate an officer’s
employment before the normal retirement date or an officer’s decision to accept voluntary redundancy. 
They are charged on an accruals basis to Services in the Comprehensive Income and Expenditure Statement
when the Council is demonstrably committed to either terminating the employment of an officer or making
an offer to encourage voluntary redundancy.  The Council is only demonstrably committed to a termination
when it has a detailed formal plan for the termination and it is without realistic possibility of withdrawal.
Where termination benefits involve the enhancement of pensions, statutory provisions require the General
Fund balance to be charged with the amount payable by the Council to the pension fund or pensioner in
the year, not the amount calculated according to the relevant accounting standards.  In the Movement in
Reserves Statement, appropriations are required to and from the Pensions Reserve to remove the notional
debits and credits for pension enhancement termination benefits and to replace them with debits for the
cash paid to the pension fund and the pensioners and any such amounts payable but unpaid at the year-
end.
Details of the cost to the Council of voluntary redundancy packages for the year are as follows:
Total
Employees
2021/22
Total
Cost
2021/22 
Total
Employees
2022/23
Total
Cost
2022/23 
£000 Remuneration Band  £000
0 0 £0-£19,999 0 0
2 84 £20,000 +  0 0
2 84 Total 0 0 
Page 90 of 260

Page 91

Remuneration Report   
WWW.MIDLOTHIAN.GOV.UK 32 
Trade Union Facility Time 
The Council is now required to publish details of Trade Union facility time incurred during the year.  Further
information is published on the Council’s website: Trade union facility time | Midlothian Council
For the reporting year 2022/23, the equivalent of 5.6 FTE employees (across 14 individuals) of paid time
facility was made available.  The proportion of their working hours spent on facility time is as follows:
Percentage of Time Number of Employees
1% - 50% 12
51% - 99% 1
100% 1 
The percentage of the total pay bill spent on facility time (calculated as total cost of facility time ÷ total pay
bill) is:
Total cost of facility time £230,990
Total Pay Bill £180,075,218
Percentage total 0.13% 
Time spend on paid Trade Union activities as a percentage of total paid facility time: 10,519 hours = 100%. 
___________________________   ___________________________
Councillor Kelly Parry     Dr Grace Vickers
Leader of the Council    Chief Executive     
Page 91 of 260

Page 92

Independent Auditor’s Report   
WWW.MIDLOTHIAN.GOV.UK 33 
Independent Auditor’s Report 
Independent Auditors Report to the members of Midlothian Council and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements 
I certify that I have audited the financial statements in the annual accounts of
Midlothian Council and its group for the year ended 31 March 2023 under Part VII of
the Local Government (Scotland) Act 1973. The financial statements comprise the
group and council Comprehensive Income and Expenditure Statement, Movement in
Reserves Statement, Balance Sheet and Cash Flow Statement, the council-only Housing
Revenue Account, the Council Tax Income Account, and the Non-Domestic Rate
Account and notes to the financial statements, including significant accounting
policies. The financial reporting framework that has been applied in their preparation
is applicable law and UK adopted international accounting standards, as interpreted
and adapted by the Code of Practice on Local Authority Accounting in the United
Kingdom 2022/23 (the 2022/23 Code).
In my opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the council and its group as
at 31 March 2023 and of the income and expenditure of the council and its
group for the year then ended;
• have been properly prepared in accordance with UK adopted international
accounting standards, as interpreted and adapted by the 2022/23 Code; and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts (Scotland)
Regulations 2014, and the Local Government in Scotland Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards
on Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the
Accounts Commission for Scotland. My responsibilities under those standards are
further described in the auditor’s responsibilities for the audit of the financial
statements section of my report. I was appointed by the Accounts Commission on 5
June 2023. My period of appointment is five years, covering 2022/23 to 2026/27. I am
independent of the council and its group in accordance with the ethical requirements
that are relevant to my audit of the financial statements in the UK including the
Financial Reporting Council’s Ethical Standard, and I have fulfilled my other ethical
responsibilities in accordance with these requirements. Non-audit services prohibited
by the Ethical Standard were not provided to the council. I believe that the audit
evidence I have obtained is sufficient and appropriate to provide a basis for my opinion.
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the
preparation of the financial statements is appropriate.
Based on the work I have performed, I have not identified any material uncertainties
relating to events or conditions that, individually or collectively, may cast significant
Page 92 of 260

Page 93

Independent Auditor’s Report   
WWW.MIDLOTHIAN.GOV.UK 34 
doubt on the ability of the council and its group to continue to adopt the going concern
basis of accounting for a period of at least twelve months from when the financial
statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the current
or future financial sustainability of the council and its group. However, I report on the
council’s arrangements for financial sustainability in a separate Annual Audit Report
available from the Audit Scotland website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of material
misstatement that I identified and my judgements thereon.
Responsibilities of the Chief Financial Officer and the audit committee
for the financial statements
As explained more fully in the Statement of Responsibilities, the Chief Financial Officer
is responsible for the preparation of financial statements that give a true and fair view
in accordance with the financial reporting framework, and for such internal control as
the Chief Financial Officer determines is necessary to enable the preparation of
financial statements that are free from material misstatement, whether due to fraud
or error.
In preparing the financial statements, the Chief Financial Officer is responsible for
assessing the ability of the council and its group to continue as a going concern,
disclosing, as applicable, matters related to going concern and using the going concern
basis of accounting unless there is an intention to discontinue the operations of the
council and its group.
The Audit Committee is responsible for overseeing the financial reporting process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial
statements as a whole are free from material misstatement, whether due to fraud or
error, and to issue an auditor’s report that includes my opinion. Reasonable assurance
is a high level of assurance, but is not a guarantee that an audit conducted in
accordance with ISAs (UK) will always detect a material misstatement when it exists.
Misstatements can arise from fraud or error and are considered material if, individually
or in the aggregate, they could reasonably be expected to influence the decisions of
users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and
regulations. I design procedures in line with my responsibilities outlined above to
detect material misstatements in respect of irregularities, including fraud. Procedures
include:
• using my understanding of the local government sector to identify that the
Local Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland Act 2003
are significant in the context of the council and its group;
• inquiring of the Chief Financial Officer as to other laws or regulations that
may be expected to have a fundamental effect on the operations of the
council and its group;
Page 93 of 260

Page 94

Independent Auditor’s Report   
WWW.MIDLOTHIAN.GOV.UK 35 
• inquiring of the Chief Financial Officer concerning the policies and
procedures of the councils and its group regarding compliance with the
applicable legal and regulatory framework;
• discussions among my audit team on the susceptibility of the financial
statements to material misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance with
laws and regulations.
The extent to which my procedures are capable of detecting irregularities, including
fraud, is affected by the inherent difficulty in detecting irregularities, the effectiveness
of the council’s controls, and the nature, timing and extent of the audit procedures
performed.
Irregularities that result from fraud are inherently more difficult to detect than
irregularities that result from error as fraud may involve collusion, intentional
omissions, misrepresentations, or the override of internal control. The capability of the
audit to detect fraud and other irregularities depends on factors such as the skilfulness
of the perpetrator, the frequency and extent of manipulation, the degree of collusion
involved, the relative size of individual amounts manipulated, and the seniority of
those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial
statements is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of my auditor’s
report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts
of the Remuneration Report
I have audited the parts of the Remuneration Report described as audited. In my
opinion, the audited parts of the Remuneration Report have been properly prepared
in accordance with The Local Authority Accounts (Scotland) Regulations 2014.
Other information 
The Chief Financial Officer is responsible for the other information in the annual
accounts. The other information comprises the Management Commentary, Annual
Governance Statement, Statement of Responsibilities and the unaudited parts of the
Remuneration Report. 
My responsibility is to read all the other information and, in doing so, consider whether
the other information is materially inconsistent with the financial statements or my
knowledge obtained in the course of the audit or otherwise appears to be materially
misstated. If I identify such material inconsistencies or apparent material
misstatements, I am required to determine whether this gives rise to a material
misstatement in the financial statements themselves. If, based on the work I have
performed, I conclude that there is a material misstatement of this other information,
I am required to report that fact. I have nothing to report in this regard.
My opinion on the financial statements does not cover the other information and I do
not express any form of assurance conclusion thereon except on the Management
Page 94 of 260

Page 95

Independent Auditor’s Report   
WWW.MIDLOTHIAN.GOV.UK 36 
Commentary and Annual Governance Statement to the extent explicitly stated in the
following opinions prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management
Commentary and Annual Governance Statement
In my opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial year
for which the financial statements are prepared is consistent with the
financial statements and that report has been prepared in accordance with
statutory guidance issued under the Local Government in Scotland Act 2003;
and
• the information given in the Annual Governance Statement for the financial
year for which the financial statements are prepared is consistent with the
financial statements and that report has been prepared in accordance with
the Delivering Good Governance in Local Government: Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited parts of the Remuneration Report
are not in agreement with the accounting records; or
• I have not received all the information and explanations I require for my
audit.
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the
wider scope responsibilities specified in the Code of Audit Practice, including those in
respect of Best Value, are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with
Part VII of the Local Government (Scotland) Act 1973 and for no other purpose. In
accordance with paragraph 108 of the Code of Audit Practice, I do not undertake to
have responsibilities to members or officers, in their individual capacities, or to third
parties.
[Signature]
Claire Gardiner CPFA
Audit Director
Audit Scotland
102 West Port
Edinburgh
EH3 9DN 
Page 95 of 260

Page 96

Principal Financial Statements   
WWW.MIDLOTHIAN.GOV.UK 37 
Principal Financial Statements 
The annual accounts summarise the Council’s transactions for the year, its year-end position at 31 March
2023 and its cash flows.  The annual accounts are prepared in accordance with the Code of Practice on
Local Authority Accounting in the United Kingdom 2022/23 (the Code), which is based on International
Financial Reporting Standards (IFRSs).  Every effort has been made to use plain language; where technical
terms are unavoidable they have been explained in the Glossary.
The four principal statements and their relationships are explained in more detail below:
• Comprehensive Income and Expenditure Statement – this shows the accounting cost in the year of
providing services in accordance with generally accepted accounting practices, rather than the amount
to be funded from taxation (or rents).  Councils raise taxation (and rents) to cover expenditure in
accordance with statutory requirements; this may be different from the accounting cost.  The taxation
position is shown in both the Expenditure and Funding analysis and the Movement in Reserves
Statement.
• Movement in Reserves Statement – this shows the movement from the start of the year to the end
on the different reserves held by the Council, analysed into ‘usable reserves’ (i.e. those that can be
applied to fund expenditure or reduce local taxation) and other ‘unusable reserves’.  The statement
shows how the movements in year of the Council’s reserves are broken down between gains and losses
incurred in accordance with generally accepted accounting practices and the statutory adjustments
required to return to the amounts chargeable to council tax (or rents) for the year.  The net
increase/decrease line shows the statutory General Fund balance and Housing Revenue Account (HRA)
balance movements in the year following those adjustments.
• Balance Sheet – this shows the value as at the Balance Sheet date of the assets and liabilities
recognised by the Council.  The net assets of the Council (assets less liabilities) are matched by the
reserves held by the Council.  Reserves are reported in two categories.  The first category of reserves
are usable reserves, i.e. those reserves that the Council may use to provide services, subject to the
need to maintain a prudent level of reserves and any statutory limitations on their use.  The second
category of reserves is those that the Council is not able to use to provide services.  This category of
reserves includes reserves that hold unrealised gains and losses (for example the Revaluation Reserve),
where amounts would only become available to provide services if the assets are sold; and reserves
that hold timing differences shown in the Movement in Reserves Statement line ‘adjustments between
accounting basis and funding basis under regulations’.
• Cash Flow Statement – this shows the changes in cash and cash equivalents of the Council during the
reporting period.  The statement shows how the Council generates and uses cash and cash equivalents
by classifying cash flows as operating, investing and financing activities.  The amount of net cash flows
arising from operating activities is a key indicator of the extent to which the operations of the Council
are funded by way of taxation and grant income or from the recipients of services provided by the
Council.  Investing activities represent the extent to which cash outflows have been made for resources
which are intended to contribute to the Council’s future service delivery.  Cash flows arising from
financing activities are useful in predicting claims on future cash flows by providers of capital (i.e.
borrowing) to the Council.  
Page 96 of 260

Page 97

Principal Financial Statements   
WWW.MIDLOTHIAN.GOV.UK 38 
Group and Council Comprehensive Income & Expenditure Statement 
2021/22     2022/23 
Gross
Expenditure
Gross
Income
Net
Expenditure
or (Income)
Group Net
Expenditure 
Gross
Expenditure
Gross
Income
Net
Expenditure
or (Income)
Group Net
Expenditure 
£000 £000 £000 £000 Service £000 £000 £000 £000 Notes
1,963 (2) 1,961 1,961 Management and Members 2,121 (23) 2,098 2,098 EFA
25,089 (2,005) 23,084 23,084 Children’s Services, Partnerships and Communities  22,014 (3,248) 18,766 18,766 EFA
143,474 (19,855) 123,619 123,619 Education 159,645 (19,994) 139,651 139,651 EFA
4,689 (3,152) 1,537 1,537 Adult Health and Social Care – Non-Delegated 7,464 (11,493) (4,029) (4,029) EFA
125,635 (71,305) 54,330 54,330 Midlothian Integrated Joint Board 140,264 (80,080) 60,184 60,184 EFA
77,816 (28,779) 49,037 49,037 Place 85,697 (35,148) 50,549 50,549 EFA
37,946 (24,170) 13,776 13,776 Corporate Solutions 41,707 (25,298) 16,409 16,409 EFA
(37,864) (30,274) (68,138) (68,138) Housing Revenue Account 45,176 (30,863) 14,313 14,313 EFA
571 0 571 571 Lothian Valuation Joint Board 565 0 565 565 EFA
706 0 706 706 Central Costs 294 0 294 294 EFA
880 0 880 882 Non- Distributable Costs 762 0 762 689 EFA
380,905 (179,542) 201,363 201,365 Cost of Services 505,709 (206,147) 299,562 299,489 
0 (4,302) Share of Operating results of Associates and Joint Ventures   0 5,738 38  
5,367 5,367 Other Operating (Income) or Expenditure    338 338 9  
17,868 17,868 Financing and Investment Income and Expenditure   12,568 12,568 10  
(260,714) (260,714) Taxation and Non-Specific Grant Income   (276,492) (276,492) 11  
(36,116) (40,416) (Surplus) or Deficit on Provision of Services    35,976 41,641 13  
(65,853) (65,853) (Surplus) or Deficit on revaluation of Property, Plant and
Equipment assets   (63,840) (63,840) 
(111,171) (111,171) Re-measurement of the net defined benefit liability/(asset)   (66,774) (66,774) 
2,678 1,701 Other (Gains) / Losses   794 (652) 
(174,346) (175,323) Other Comprehensive (Income) and Expenditure   (129,820) (131,266) 
(210,462) (215,739) Total Comprehensive (Income) and Expenditure   (93,844) (89,625) 
Page 97 of 260

Page 98

Principal Financial Statements   
WWW.MIDLOTHIAN.GOV.UK 39 
Group and Council Movement in Reserves Statement 
General
Fund
Housing
Revenue
Account
Capital
Fund
Repairs &
Renewals
Fund
Total
Usable
Reserves
Total
Unusable
Reserves
Total
Council
Reserves
Council's
Share of
Reserves of
Associates,
Subsidiaries
&
Joint
Ventures
Total Group
Reserves 
£000 £000 £000 £000 £000 £000 £000 £000 £000
Balance at 31 March 2022 (32,432) (28,084) (22,178) (3,718) (86,412) (660,028) (746,440) (11,203) (757,643)
Movement between Lothian Valuation Joint Board 2021/22
Unaudited and Audited Accounts 0 0 0 0 0 0 0 36 36
Revised Balance 31 March 2022 (32,432) (28,084) (22,178) (3,718) (86,412) (660,028) (746,440) (11,167) (757,607)
Movement in Reserves during 2022/23         
Total Comprehensive Expenditure and Income 15,518 20,458 2,071 0 38,047 (131,891) (93,844) 4,219 (89,625)
Adjustments between accounting basis and funding basis
under regulations  (Note 7) (16,400) (26,586) 0 0 (42,986) 42,986 0 0 0
Transfers to/(from) other statutory reserves (1,649) 2,069 0 (420) 0 0 0 0 0
(Increase)/Decrease in year (2,531) (4,059) 2,071 (420) (4,939) (88,905) (93,844) 4,219 (89,625)
Balance at 31 March 2023 Carried Forward (34,963) (32,143) (20,107) (4,138) (91,351) (748,933) (840,284) (6,948) (847,232) 
General
Fund 
Housing
Revenue
Account
Capital
Fund
Repairs &
Renewals
Fund
Total
Usable
Reserves
Total
Unusable
Reserves
Total
Council
Reserves
Council's
Share of
Reserves
of Associates,
Subsidiarie
s &
Joint
Ventures
Total
Group
Reserves 
£000 £000 £000 £000 £000 £000 £000 £000 £000
Balance at 31 March 2021 (29,672) (48,385) (24,158) (3,897) (106,112) (429,866) (535,978) (5,909) (541,887)
Movement between Lothian Valuation Joint Board 2020/21
Unaudited and Audited Accounts 0 0 0 0 0 0 0 (17) (17)
Revised Balance 31 March 2021 (29,672) (48,385) (24,158) (3,897) (106,112) (429,866) (535,978) (5,926) (541,904)
Movement in Reserves during 2021/22         
Total Comprehensive Expenditure and Income 25,583 (61,700) 1,980 0 (34,137) (176,325) (210,462) (5,277) (215,739)
Adjustments between accounting basis and funding basis
under regulations  (Note 7) (28,164) 82,001 0 0 53,837 (53,837) 0 0 0
Transfers to/(from) other statutory reserves (179) 0 0 179 0 0 0 0 0
(Increase)/Decrease in year (2,760) 20,301 1,980 179 19,700 (230,162) (210,462) (5,277) (215,739)
Balance at 31 March 2022 Carried Forward (32,432) (28,084) (22,178) (3,718) (86,412) (660,028) (746,440) (11,203) (757,643)
Page 98 of 260

Page 99

Principal Financial Statements   
WWW.MIDLOTHIAN.GOV.UK 40 
Group and Council Balance Sheet 
31 Mar 22 31 Mar 22  31 Mar 23 31 Mar 23 
Midlothian
Council
Group  Midlothian
Council
Group 
£000 £000  £000 £000 Notes
1,080,738 1,080,738 Property, Plant and Equipment 1,155,972 1,155,972 14
31,375 31,375 Infrastructure Assets 34,819 34,819 15
329 329 Heritage Assets 458 458 16
348 348 Intangible Assets  202 202 17
3,767 3,718 Long-term Debtors 4,190 4,137 18/19
8,508 8,508 Long-term Investments 11,693 6,082 19
0 11,167 Share of net assets of associates and joint
ventures 0 12,450 38
1,125,065 1,136,183 Long-term Assets 1,207,334 1,214,120 
43,236 43,236 Short-term Deposits (1) 20,122 20,122 19
1,480 1,480 Assets held for Sale 1,080 1,080 21
983 983 Inventories 1,023 1,023 22
36,681 36,732 Short-term Debtors 40,811 40,861 19/23
109,975 109,975 Cash and Cash Equivalents (1) 95,654 95,654 24
192,355 192,406 Current Assets 158,690 158,740 
(3,865) (3,865) Short -term Borrowing (3,195) (3,195) 19
(53,496) (53,462) Short-term Creditors (58,546) (58,434) 19/25
(1,231) (1,231) Provisions (1,239) (1,239) 26
(43,432) (43,432) Grants Received in Advance (44,731) (44,731) 27
(102,024) (101,990) Current Liabilities (107,711) (107,599) 
(322,365) (322,365) Long-term Borrowing (321,490) (321,490) 19
(92,431) (92,431) Other Long -term Liabilities (PPP Contracts) (88,739) (88,739) 19/33
(54,160) (54,160) Other Long-term Liabilities (Pensions)  (7,800) (7,800) 34/35
(468,956) (468,956) Long-term Liabilities (418,029) (418,029) 
746,440 757,643 Net Assets 840,284 847,232 
86,412 97,443 Usable Reserves 91,351 98,293 28
660,028 660,200 Unusable Reserves 748,933 748,939 29
746,440 757,643 Total Reserves 840,284 847,232 
(1) In 2021/22 there was a misclassification of £50.214 million in short-term investments which should have been
reflected in Cash and Cash Equivalents.
The unaudited accounts were authorised for issue on 26 June 2023 and the audited accounts were
authorised for issue on 30 October 2023.
I certify that the Balance Sheet presents a true and fair view of the financial position of the Council and its
Group at 31 March 2023, and its income and expenditure for the year ended 31 March 2023. 
___________________________
David Gladwin
Chief Financial Officer 
Page 99 of 260

Page 100

Principal Financial Statements   
WWW.MIDLOTHIAN.GOV.UK 41 
Group and Council Cash Flow Statement 
2021/22 2021/22  2022/23 2022/23
Midlothian
Council
Group  Midlothian
Council
Group
£000 £000  £000 £000
36,116 40,416 Net Surplus or (Deficit) on the Provision of Services (35,976) (41,641) 
Adjustments to Net Surplus or Deficit on the Provision of
Services for Non-Cash Movements  
37,793 37,793 Depreciation 41,639 41,639
(62,407) (62,407) Impairment and downward revaluations 17,379 17,379
327 327 Amortisation 171 171
(5,636) (5,588) (Increase)/decrease in debtors (7,811) (7,758)
7,967 7,933 Increase/(decrease) in creditors 2,372 2,261
(45) (45) (Increase)/decrease in inventories (40) (40)
24,301 24,301 Movement in pension liability 20,414 20,414
5,993 5,993 Carrying amount of non-current assets sold or
derecognised
1,158 1,158
499 (3,815) Other non-cash items charged to the net surplus or deficit
on the provision of services
(2,071) 3,652
8,792 4,492  73,211 78,876  
Adjust for Items included in the Net Surplus or Deficit
that are Investing and Financing Activities  
74,985 74,985 Proceeds from short-term and long-term Deposits 225,900 225,900
(626) (626)
Sale of property, plant and equipment and intangible
assets (991) (991)
(24,827) (24,827)
Any other items for which the cash effects are investing
or financing cash flows (27,824) (27,824)
49,532 49,532  197,085 197,085
58,324 54,024 Net Cash Flows from Operating Activities 270,296 275,961  
Investing Activities  
(62,914) (62,914)
Purchase of property, plant and equipment and intangible
assets (72,229) (72,229)
(46,495) (46,495) Purchase of short-term and long-term Deposits (205,015) (205,015)
(495) (495) Other payments for investing activities 0 0
626 626 Proceeds from the sale of property, plant and equipment
and intangible assets
991 991
26,346 26,346 Other receipts from investing activities 32,455 32,455
(82,932) (82,932) Net Cash Flows from Investing Activities (243,798) (243,798)  
Financing Activities  
50,000 50,000 Cash receipts of short- and long-term borrowing 0 0
(3,335) (3,335) Cash payments for the reduction of the outstanding
liabilities relating to finance leases and on balance-sheet
PPP contracts
(3,484) (3,484)
144 144 Other Receipts from Financing Activities 159 159
(1,524) (1,524) Repayments of short- and long-term borrowing (1,518) (1,518)
45,285 45,285 Net Cash Flows from Financing Activities (4,843) (4,843)
56,793 56,793 Net Increase or Decrease in Cash and Cash Equivalents  (14,321) (14,321)
53,182 53,182 Cash and Cash Equivalents at 1 April  109,975 109,975
109,975 109,975 Cash and Cash Equivalents at 31 March (Note 24) (1) 95,654 95,654
1. In 2021/22 there was a misclassification of £50.214 million in short-term investments which should have been
reflected in Cash and Cash Equivalents.
The cash flows for operating activities include the following items:
£000 £000 Cash Flow Statement: Interest Paid and Received £000 £000
1,925 1,925 Interest Received 3,161 3,161
(16,780) (16,780) Interest Paid (15,269) (15,269)
0 0 Dividends Received 0 0
Page 100 of 260

Page 101

Expenditure and Funding Analysis   
WWW.MIDLOTHIAN.GOV.UK 42 
Expenditure and Funding Analysis 
This Expenditure and Funding Analysis shows how annual expenditure is used and funded from resources
(government grants, rents, council tax and business rates) by the Council in comparison with those
resources consumed or earned by the Council in accordance with generally accepted accounting practices. 
It also shows how this expenditure is allocated for decision making purposes between the Council’s
services.  Income and expenditure accounted for under generally accepted accounting practices are
presented more fully in the Comprehensive Income and Expenditure Statement. 
2021/22    2022/23 
Net
expenditure
chargeable to
the General
Fund and
HRA balances
Adjustments
(note 6)
Net
expenditure
in the CIES
(note 13) 
Net
expenditure
chargeable
to the
General
Fund and
HRA
balances
Adjustments
(note 6)
Net
expenditure
in the CIES
(note 13)
£000 £000 £000 Service £000 £000 £000
1,851 110 1,961 Management &
Members 1,968 130 2,098
21,870 1,214 23,084
Children’s Services,
Partnerships &
Communities
18,025 741 18,766
94,475 29,144 123,619 Education 110,003 29,648 139,651
1,748 (211) 1,537 Adult Health & Social
Care –Non-Delegated (4,821) 792 (4,029)
50,598 3,732 54,330 Midlothian Integrated
Joint Board 56,612 3,572 60,184
34,701 14,336 49,037 Place 35,756 14,793 50,549
13,973 (197) 13,776 Corporate Solutions 18,411 (2,002) 16,409
(16,593) (51,545) (68,138) Housing Revenue
Account (15,957) 30,270 14,313
571 0 571 Joint Boards 565 0 565
660 46 706 Central Costs 210 84 294
906 (26) 880 Non-Distributable Costs 773 (11) 762
204,760 (3,397) 201,363 Net Cost of Services 221,545 78,017 299,562
(212,261) (25,218) (237,479) Other Income and
Expenditure (228,555) (35,031) (263,586)
(7,501) (28,615) (36,116) (Surplus) or Deficit (7,010) 42,986 35,976
(78,058)     Opening General Fund
and HRA Balance (60,516)    
(17,541)    
Less/Plus (Surplus) or
Deficit on General Fund
and HRA Balance in
year
(7,010)    
0   Transfer to/from Other
Statutory Reserves 420  
(60,517)    
Closing General Fund
and HRA Balance at 31
March*
(67,106)    
*For a split of this balance between the General Fund and the HRA – See the Movement in Reserves Statement. 
Page 101 of 260

Page 102

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 43 
Notes to the Accounts 
The notes to the accounts provide further information about the basis of preparation of the Annual
Accounts, the specific accounting policies used and where the materiality is such that further disclosure is
merited.
The Council’s Annual Accounts for 2022/23 have been prepared on a going concern basis.  The concept of
a going concern assumes that the Council’s functions and services will continue in operational existence
for the foreseeable future.  The provisions in respect of going concern reporting requirements reflect the
economic and statutory environment in which local authorities operate.  The provisions confirm that, as
authorities cannot be created or dissolved without statutory prescription, they must prepare their annual
accounts on a going concern basis of accounting.  In accordance with the CIPFA Code of Local Government
Accounting (2022/23), the Council is required to prepare its annual accounts on a going concern basis
unless informed by the relevant national body of the intention for dissolution without transfer of services
or function to another entity.  The accounts are prepared on the assumption that the Council will continue
in operational existence for the foreseeable future.
1. Accounting Policies 
i. General Principles 
The statement of accounts summarises the Council’s transactions for the 2022/23 financial year and its
position for the year-end of 31 March 2023.  The Council is required to prepare an annual statement of
accounts by the Local Authority Accounts (Scotland) Regulations 2014, which Section 12 of the Local
Government Scotland Act 2003 require to be prepared in accordance with proper accounting practices. 
These practices under Section 21 of the 2003 Act primarily comprise the Code of Practice on Local Authority
Accounting in the United Kingdom 2022/23, supported by International Financial Reporting Standards
(IFRS) and the statutory guidance issued under section 12 of the 2003 Act.
The accounting convention adopted in the statement of accounts is principally historical cost, modified by
the revaluation of certain categories of non-current assets and financial instruments.
ii. Accruals of Income and Expenditure 
Activity is accounted for in the year that it takes place, not simply when cash payments are made and
received.  In particular:
• Revenue from contracts with service recipients, whether for services or the provision of goods, is
recognised when (or as) the goods or services are transferred to the service recipient in accordance
with the performance obligations of the contract.
• Supplies are recorded as expenditure when they are consumed – where these is a gap between the
date supplies are received and their consumption, they are carried as inventories on the Balance Sheet.
• Expenses in relation to services received (including services provided by employees) are recorded as
expenditure when the services are received rather than when payments are made.
• Interest receivable on deposits and payable on borrowings is accounted for respectively as income and
expenditure on the basis of the effective interest rate for the relevant financial instrument rather than
the cash flows fixed or determined by the contract.
• Where revenue and expenditure have been recognised but cash has not been received or paid, a
debtor or creditor for the relevant amount is recorded in the Balance Sheet.  Where debts may not be
Page 102 of 260

Page 103

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 44 
settled, the balance of debtors is written down and a charge made to revenue for the income that
might not be collected.
iii. Cash and Cash Equivalents 
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty on
notice of not more than 24 hours.  Cash equivalents are highly liquid deposits that mature in no more than
three months or less from the date of acquisition and that are readily convertible to known amounts of
cash with insignificant risk of change in value.
In the Cash Flow Statement, cash and cash equivalents are shown net of bank overdrafts that are repayable
on demand and form an integral part of the Council’s cash management.
iv. Prior Period Adjustments, Changes in Accounting Policies and Estimations and
Errors 
Prior period adjustments may arise as a result of a change in accounting policies or to correct a material
error.  Changes in accounting estimates are accounted for prospectively, i.e. in the current and future years
affected by the change and do not give rise to a prior year adjustment.
Changes in accounting policies are only made when required by proper accounting practices or the change
provides more reliable or relevant information about the effect of transactions, other events and
conditions on the Council’s financial position or financial performance.  Where a change is made, it is
applied retrospectively (unless stated otherwise) by adjusting opening balances and comparative amounts
for the prior period as if the new policy had always been applied.
Material errors discovered in prior period figures are corrected retrospectively by amending opening
balances and comparative amounts for the prior period.
v. Charges to Revenue for Non-Current Assets 
Services and support services are debited with the following amounts to record the cost of holding non-
current assets during the year:
• Depreciation attributable to the assets used by the relevant service;
• Revaluation and impairment losses on assets used by the service where there are no accumulated
gains in the revaluation reserve against which the losses can be written off;
• Amortisation of intangible assets attributable to the service.
The Council is not required to raise council tax to fund depreciation, revaluation and impairment losses or
amortisation.  However it is required to make an annual contribution from revenue towards the reduction
in its overall borrowing requirement, equal to an amount calculated on a prudent basis determined by the
Council in accordance with the Statutory Repayment of Loans Fund Advances.  This is known as the Loans
Fund Principal Repayment.  Depreciation, revaluation and impairment losses, and amortisation are
therefore replaced by the Loans Fund Principal Repayments in the General Fund balance by way of an
adjusting transaction with the Capital Adjustment Account in the Movement in Reserves Statement for the
difference between the two.
vi. Employee Benefits 
Benefits Payable during Employment 
Short-term employee benefits are those due to be settled wholly within 12 months of the year-end.  They
include such benefits as salaries, paid annual leave and flexible working for current employees.  They are
Page 103 of 260

Page 104

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 45 
recognised as an expense for services in the year in which employees render service to the Council.  An
accrual is made for the cost of holiday entitlements (or any form of leave, e.g. time off in lieu) earned by
employees but not taken before the year-end that employees can carry forward into the next financial
year.  The accrual is charged to surplus or deficit on the provision of services, but then reversed out through
the Movement in Reserves Statement to the accumulated absences account so that holiday entitlements
are charged to revenue in the financial year in which the holiday absence occurs.  
Termination Benefits 
Termination benefits are amounts payable as a result of a decision by the Council to terminate an officer’s
employment before normal retirement date or an officer’s decision to accept voluntary redundancy in
exchange for those benefits and are charged on an accruals basis to the appropriate service line in the
Comprehensive Income and Expenditure Statement when the Council is demonstrably committed to the
termination of the employment of an officer or group of officers or making an offer to encourage voluntary
severance.  
Where termination benefits involve the enhancement of pensions, statutory provisions require the General
Fund balance to be charged with the amount payable by the Council to the pension fund or pensioner in
the year, not the amount calculated according to the relevant accounting standards.  In the Movement in
Reserves Statement, appropriations are required to and from the pensions reserve to remove the notional
debits and credits for pension enhancement termination benefits and replace them with debits for the
cash paid to the pension fund and pensioners and any such amounts payable but unpaid at the year-end.
Post-employment Benefits 
Employees of the Council are members of two separate pension schemes:
• The Teachers’ pension scheme, administered by the Scottish Government;
• The Local Government Pensions Scheme, administered by the City of Edinburgh Council on behalf
of Lothian Pension Fund.
Both schemes provide defined benefits to members (retirement lump sums and pensions), earned as
employees worked for the Council.
However, the arrangements for the teachers’ scheme mean that liabilities for these benefits cannot
ordinarily be identified specifically to the Council. The scheme is therefore accounted for as if it were a
defined contribution scheme and no liability for future payments of benefits is recognised in the Balance
Sheet.  The education services line in the Comprehensive Income and Expenditure Statement is charged
with the employer’s contributions payable to the Teachers’ Pensions in the year.
The Local Government Pension Scheme 
The Local Government Pension Scheme is accounted for as a defined benefits scheme.
The liabilities of the Lothian Pension Fund attributable to the Council are included in the Balance Sheet on
an actuarial basis using the projected unit method – i.e. an assessment of the future payments that will be
made in relation to retirement benefits earned to date by employees, based on assumptions about
mortality rates, employee turnover rates, etc. and projected earnings for current employees.
Liabilities are discounted to their value at current prices, using a discount rate as advised by the actuary,
Hymans Roberson LLP.
The assets of Lothian Pension Fund attributable to the Council are included in the Balance Sheet at their
fair value:
• Quoted securities – current bid price;
Page 104 of 260

Page 105

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 46 
• Unquoted securities – professional estimate;
• Unitised securities – current bid price;
• Property – market value.
The change in the net pension’s liability is analysed into the following components:
Service cost comprising:
• Current service cost – the increase in liabilities as a result of years of service earned this year –
allocated in the Comprehensive Income and Expenditure Statement to the services for which the
employees worked;
• Past service cost – the increase in liabilities as a result of a scheme amendment or curtailment whose
effect relates to years of service earned in earlier years – debited to the surplus or deficit on the
provision of services in the Comprehensive Income and Expenditure Statement as part of Non-
Distributed Costs;
• Net interest on the net defined liability (asset), i.e. net interest expense for the Council – the change
during the period in the net defined liability (asset) that arises from the passage of time charged to the
financing and investment income and expenditure line of the Comprehensive Income and Expenditure
Statement – this is calculated by applying the discount rate used to measure the defined benefit
obligation at the beginning of the period to the net defined benefit liability (asset) at the beginning of
the period, taking into account any changes in the net defined benefit liability (asset) during the period
as a result of contribution and benefit payments.
Re-measurements comprising:
• The return on plan assets – excluding amounts included in net interest on the net defined liability
(asset) – charged to the pensions reserve as other comprehensive income and expenditure;
• Actuarial gains and losses – changes in the net pensions liability that arise because events have not
coincided with assumptions made at the last actuarial valuation or because the actuaries have updated
their assumptions – charged to pensions reserve as other comprehensive income and expenditure;
• Contributions paid to the Lothian Pension Fund – cash paid as employer’s contributions to the pension
fund in settlement of liabilities; not accounted for as an expense.
In relation to retirement benefits, statutory provisions require the General Fund balance to be charged
with the amount payable by the Council to the pension fund or directly to pensioners in the year, not the
amount calculated according to the relevant accounting standards.  In the Movement in Reserves
Statement, this means that there are transfers to and from the pensions reserve to remove the notional
debits and credits for retirement benefits and replace them with debits for the cash paid to the pension
fund and pensioners and any such amounts payable but unpaid at the year-end.  The negative balance that
arises on the pensions reserve thereby measures the beneficial impact to the General Fund of being
required to account for retirement benefits on the basis of cash flows rather than as benefits earned by
employees.
Pension Net Asset Restriction Calculation 
The actuary has calculated the Council’s IAS 19 defined benefit surplus for 2022/23 to be £188.463 million
as detailed in Note 35 to the accounts.  IAS 19 states that when an entity has a surplus in the defined benefit
plan it should measure the net defined benefit of the asset as the lower of:
• The surplus in the defined benefit plan, and
• The asset ceiling, which the actuary has calculated as the present value of any economic benefits
available in the form of reductions in future contributions to the plan.  
Page 105 of 260

Page 106

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 47 
For IFRIC 14 purposes, the actuary has calculated the net present value of the future contributions which
exceeds the value of the future service costs resulting in a negative contribution.  As a result of this
calculation IFRIC 14 advises that no defined benefit plan asset should be recognised on the Council’s
Balance Sheet and there is no requirement to recognise the difference as a liability.  The Council therefore
has reported no long-term asset or long-term liability for pensions in 2022/23. 
Discretionary Benefits 
The Council also has restricted powers to make discretionary awards of retirement benefits in the event of
early retirements.  Any liabilities estimated to arise as a result of an award to any member of staff (including
teachers) are accrued in the year of the decision to make the award and accounted for using the same
policies as are applied to the Local Government Pension Scheme.
vii. Events after the Reporting Period 
Events after the Balance Sheet reporting period are those events, both favourable and unfavourable, that
occur between the Balance Sheet date and the date when the statement of accounts is authorised for issue. 
Two types of events can be identified:
• Those that provide evidence of conditions that existed at the end of the reporting period – the
statement of accounts is adjusted to reflect such events;
• Those that are indicative of conditions that arose after the reporting period – the statement of
accounts is not adjusted to reflect such events, but where such a category of events would have a
material effect, disclosure is made in the notes of the nature of the events and their estimated financial
effect.
Events taking place after the date of authorisation for issue are not reflected in the statement of accounts.
viii. Financial Instruments 
Financial Liabilities 
Financial liabilities are recognised on the Balance Sheet when the Council becomes a party to the
contractual provisions of a financial instrument and are initially measured at fair value and are carried at
their amortised cost.  Annual charges to the financing and investment income and expenditure line in the
Comprehensive Income and Expenditure Statement (CIES) for interest payable are based on the carrying
amount of the liability, multiplied by the effective rate of interest for the instrument.  The effective interest
rate is the rate that exactly discounts estimated future cash payments over the life of the instrument to
the amount at which it was originally recognised.
For most of the borrowings that the Council has, this means that the amount presented in the Balance
Sheet is the outstanding principal repayable (plus accrued interest); and interest charged to the CIES is the
amount payable for the year according to the loan agreement.
Where premiums and discounts have been charged to the CIES, regulations allow the impact on the General
Fund or Housing Revenue Account balances to be spread over future years.  The Council has a policy of
spreading the gain or loss over the term that was remaining on the loan against which the premium was
payable or discount receivable when it was repaid.  The reconciliation of amounts charged to the CIES to
the net charge required against the General Fund balance is managed by a transfer to or from the financial
instruments adjustment account in the Movement in Reserves Statement. 
Page 106 of 260

Page 107

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 48 
Financial Assets 
Financial assets are classified based on a classification and measurement approach that reflects the
business model for holding the financial assets and their cash flow characteristics.  The Council holds
financial assets measured at:
• Amortised cost; and
• Fair value through other comprehensive income (FVOCI).
The Council’s business model is to hold investments to collect contractual cash flows.  Financial assets are
therefore classified as amortised cost, except for those whose contractual payments are not solely
payment of principal and interest (i.e. where the cash flows do not take the form of a basic debt
instrument).
Financial Assets Measured at Amortised Cost 
Financial assets measured at amortised cost are recognised on the Balance Sheet when the Council
becomes party to the contractual provisions of a financial instrument and are initially measured at fair
value.  They are subsequently measured at their amortised cost.  Annual credits to the financing and
investment income and expenditure line in the CIES for interest receivable are based on the carrying
amount of the asset multiplied by the effective rate of interest for the instrument.  For most of the financial
assets held by the Council, this means that the amount presented in the Balance Sheet is the outstanding
principal receivable (plus accrued interest), and interest credited to the CIES is the amount receivable for
the year in the loan agreement.
Any gains and losses that arise on de-recognition of a financial asset are credited or debited to the financing
and investment income and expenditure line in the CIES.
Expected Credit Loss Model 
The Council recognises expected credit losses on all of its financial assets held at amortised cost (or where
relevant FVOCI), either on a   12-month or lifetime basis.  The expected credit loss model also applies to
lease receivables and contract assets.  Only lifetime losses are recognised for trade receivables (debtors)
held by the Council.
Impairment losses are calculated to reflect the expectation that the future cash flows might not take place
because the borrower could default on their obligations.  Credit risk plays a crucial part in assessing losses. 
Where risk has increased significantly since an instrument was initially recognised, losses are assessed on
a lifetime basis.  Where risk has not increased significantly or remains low, losses are assessed on the basis
of 12-month expected losses.
Financial Assets Measured at Fair Value through Other Comprehensive Income (FVOCI) 
Financial assets that are measured at FVOCI are recognised on the Balance Sheet when the Council
becomes a party to the contractual provisions of a financial instrument and are initially measured and
carried at fair value.  Fair value gains and losses are recognised as they arise in other comprehensive
income.
Fair Value Measurement of Financial Assets 
Fair value of an asset is the price that would be received to sell an asset in an orderly transaction between
market participants at the measurement date.  The fair value measurements of the Council’s financial
assets are based on the following techniques:
• Instruments with quoted market prices – the market price;
Page 107 of 260

Page 108

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 49 
• Other instruments with fixed determinable payments – discounted cash flow analysis.
The inputs to the measurement techniques are categorised in accordance with the following three levels:
• Level 1 inputs – quoted prices (unadjusted) in active markets for identical assets that the Council can
access at the measurement date;
• Level 2 inputs – inputs other than quoted prices included in Level 1 that are observable for the asset,
either directly or indirectly; 
• Level 3 inputs – unobservable inputs for the asset.
Any gains and losses that arise on de-recognition of the asset are credited or debited to the financing and
investment income and expenditure line in the Comprehensive Income and Expenditure Statement.
The Council designates that investments held for strategic purposes be classified as being measured as
FVOCI.  Any gains and losses on these investments will be held in the Financial Instruments Revaluation
Reserve.
Where assets are identified as impaired because of a likelihood arising from a past event that payments
due under the contract will not be made (fixed or determinable payments) or fair value falls below cost,
the asset it written down and a charge made to the Financing and Investment Income and Expenditure line
in the CIES.  If the asset has fixed or determinable payments, the impairment loss is measured as the
difference between the carrying amount and the present value of the revised future cash flows discounted
at the asset’s original effective interest rate.  Otherwise the impairment loss is measured as any shortfall
of fair value against the acquisition cost of the instrument (net of any principal repayment and
amortisation).
ix. Government Grants and Contributions 
Whether paid on account, by instalments or in arrears, government grants and third party contributions
and donations are recognised  as due to the Council when there is reasonable assurance that:
• The Council will comply with the conditions attached to the payments; and
• The grants or contributions will be received.
Amounts recognised as due to the Council are not credited to the Comprehensive Income and Expenditure
Statement until conditions attached to the grant or contribution have been satisfied.  Conditions are
stipulations that specify that the future economic benefits or service potential embodied in the asset in the
form of the grant or contribution are required to be consumed by the recipient as specified, or future
economic benefits or service potential must be returned to the transferor.
Monies advanced as grants and contributions for which conditions have not been satisfied are carried in
the Balance Sheet as creditors.  When conditions are satisfied, the grant or contribution is credited to the
relevant service line (attributable revenue grants and contributions) or taxation and non-specific grant
income and expenditure (non-ring-fenced revenue grants and all capital grants) in the Comprehensive
Income and Expenditure Statement.
Where capital grants are credited to the Comprehensive Income and Expenditure Statement, they are
reversed out of the General Fund Balance in the Movement in Reserves Statement.  Where the grant has
yet to be used to finance capital expenditure, it is posted to the capital grants received in advance.  Where
it has been applied, it is posted to the Capital Adjustment Account once they have been applied to fund
capital expenditure. 
Page 108 of 260

Page 109

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 50 
x. Heritage Assets 
A heritage asset is defined as a tangible asset with historical, artistic, scientific, technological, geophysical
or environmental qualities that is held and maintained principally for its contribution to knowledge and
culture.
Heritage assets are valued at insurance replacement value where available, otherwise assets are held at
depreciated historic cost since the cost of obtaining a valuation would outweigh the benefits to users of
the accounts.
xi. Intangible Assets 
Expenditure on non-monetary assets that do not have physical substance but are controlled by the Council
as result of past events (i.e. software licences) is capitalised when it is expected that future economic
benefits or service potential will flow from the intangible asset to the Council.
Intangible assets are measured initially at cost.  Amounts are only revalued where the fair value of assets
held by the Council can be determined by reference to an active market.  In practice, no intangible asset
held by the Council meets this criterion, and they are therefore carried at amortised cost.  The depreciable
amount of an intangible asset is amortised over its useful life to the relevant service(s) line in the
Comprehensive Income and Expenditure Statement.  An asset is tested for impairment whenever there is
an indication that the asset might be impaired – any losses recognised are posted to the relevant service
line(s) in the Comprehensive Income and Expenditure Statement.
xii. Interests in Companies and Other Entities 
The Council has an interest in companies and other entities that have the nature of subsidiaries, associates
and jointly controlled entities.  In the Council’s own single entity accounts these interests are recorded as
the share of net assets.
xiii. Inventories 
Inventories are included in the Balance Sheet at the lower of cost and net realisable value.  The cost of
inventories is assigned using the First in First out (FIFO) costing formula.
xiv. Allocation of Central Support Services 
Support services will not be recharged although the costs of services provided by the Council will be
charged to separate accounts such as the Housing Revenue Account.  The costs of support and other
services will be allocated in government returns as required.
xv. Property, Plant and Equipment 
Assets that have physical substance and are held for use in the production or supply of goods or services,
for rental to others or for administrative purposes, and that are expected to be used during more than one
financial year are classified as Property, Plant and Equipment.
Recognition 
Expenditure on the acquisition, creation or enhancement of Property, Plant and Equipment is capitalised
on an accruals basis, provided it is probable that the future economic benefits or service potential
associated with the item will flow to the Council and the cost of the item can be measured reliably. 
Expenditure that maintains but does not add to an asset’s potential to deliver future economic benefits or
service potential (i.e. repairs and maintenance) is charged as an expense when it is incurred.
Page 109 of 260

Page 110

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 51 
Measurement 
Assets are initially measured at cost, comprising:
• The purchase price;
• Any costs attributable to bringing the asset to the location and condition necessary for it to be capable
of operating in the manner intended by management.
The Council does not capitalise borrowing costs incurred whilst assets are under construction.
The cost of assets acquired other than by purchase is deemed to be its fair value, unless the acquisition
does not have commercial substance (i.e. it will not lead to a variation in the cash flows of the Council).  In
the latter case, where an asset is acquired via an exchange, the cost of the acquisition is the carrying
amount of the asset given up by the Council.
Assets are carried in the balance sheet using the following measurement bases:
• Community assets – depreciated historical cost;
• Assets under construction – historical cost;
• Dwellings - current value, determined using the basis of existing use value for social housing (EUV-SH).
Gross valuations are reduced by applying the discount factor which is designed to reflect that houses
are only available for social use.  Any new build housing and newly purchased houses are valued at
historic cost;
• Vehicles, Plant and Equipment – depreciated historical cost;
• Surplus Assets – fair value based on open market value;
• Other land and buildings – current value, determined as the amount that would be paid for the asset
in its existing use (existing use value – EUV).
Where there is no market-based evidence of current value because of the specialist nature of an asset,
depreciated replacement cost (DRC) is used as an estimate of current value.
Where non-property assets that have short useful lives or low values (or both), depreciated historical cost
basis is used as a proxy for current value.
Assets included in the Balance Sheet at current value are revalued as a minimum every five years to ensure
their carrying amount is not materially different from their current value at year-end. As part of the
Council’s plan for revaluation, a move has been made to revalue all items in a specific category in the same
year, if one of the assets in the category has been revalued.  Increases in valuations are matched by credits
to the Revaluation Reserve to recognise any unrealised gains.  Exceptionally, gains might be credited to the
surplus or deficit on the provision of services where they arise from the reversal of a loss previously charged
to the service.
Where decreases in value are identified, they are accounted for by:
• Where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the carrying
amount of the asset is written down against that balance (up to the amount of the accumulated gains);
• Where there is no balance in the Revaluation Reserve or an insufficient balance, the carrying amount
of the asset is written down against the relevant service line(s) in the Comprehensive Income and
Expenditure Statement (CIES).
The Revaluation Reserve contains revaluation gains recognised since 1 April 2007 only, the date of its
formal implementation.  Gains arising before that date have been consolidated into the Capital Adjustment
Account.
Page 110 of 260

Page 111

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 52 
Impairment 
Assets are assessed at each year-end to establish whether there is any indication that an asset may be
impaired.  Where indications exist and any possible differences are estimated to be material, the
recoverable amount of the asset is estimated and, where this is less than the carrying amount of the asset,
an impairment loss is recognised for the shortfall.
Where impairment losses are identified, they are accounted for by:
• Where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the carrying
amount of the asset is written down against that balance (up to the amount of the accumulated gains);
• Where there is no balance in the Revaluation Reserve or an insufficient balance the carrying amount
of the asset is written down against the relevant service line(s) in the CIES.
Where an impairment loss is subsequently reversed, the reversal is credited to the Revaluation Reserve or
the relevant service line(s) in the CIES, up to the amount of the original loss, adjusted for depreciation that
would have been charged if the loss had not been recognised.
Depreciation 
Depreciation is provided for on all Property, Plant and Equipment assets by the systematic allocation of
their depreciable amounts over their useful lives.  An exception is made for assets without a determinable
finite useful life (i.e. freehold land and certain Community Assets) and assets that are not yet available for
use (i.e. assets under construction).
Depreciation is calculated on the following bases:
• Dwellings and other buildings – straight-line allocation over the useful life of the property as estimated
by the valuers;
• Vehicles, plant and equipment – straight-line allocation over the useful life of the assets in Balance
Sheet, as advised by a suitably qualified officer).
Where an item of Property, Plant and Equipment asset has major components whose cost is significant in
relation to the total cost of the item, the components are depreciated separately.  Council policy is to only
consider any asset with a gross book value of £1.5 million or above.  The assessment of which components
of these assets require to be recognised and depreciated separately is based on the cost of each of
component.  Significance is determined by comparing the cost of components against the overall cost of
the asset.  This threshold is set at 15% or more of the overall cost of the asset.
Revaluation gains are also depreciated, with an amount equal to the difference between current value
depreciation charged on assets and the depreciation that would have been chargeable based on their
historical cost being transferred each year from the Revaluation Reserve to the Capital Adjustment
Account.
Disposals and Non-current Assets Held for Sale 
When it becomes probable that the carrying amount of the asset will be recovered principally through a
sale transaction rather than through its continuing use, it is reclassified as an Asset Held for Sale.  The asset
is revalued immediately before reclassification and then carried at the lower of this amount and fair value
less costs to sell.  Where there is a subsequent decrease to fair value less costs to sell, the loss is posted to
the other operating expenditure Line in the CIES.  Gains in fair value are recognised only up to the amount
of any previously recognised losses in the Surplus or Deficit on the Provision of Services.  Depreciation is
not charged on Assets Held for Sale.
Page 111 of 260

Page 112

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 53 
If assets no longer meet the criteria to be classified as Assets Held for Sale, they are reclassified back to
non-current assets and valued at the lower of their carrying amount before they were classified as Held for
Sale; adjusted for depreciation, amortisation or revaluations that would have been recognised had they
not been classified as Held for Sale, and their recoverable amount at the date of the decision not to sell.  
Assets that are to be abandoned or scrapped are not reclassified as Assets Held for Sale.
When an asset is disposed of or decommissioned, the carrying amount of the asset in the Balance Sheet
(whether Property, Plant and Equipment or Assets Held for Sale) is written off to the Other Operating
Expenditure Line in the CIES as part of the gain or loss on disposal.  Receipts from disposals (if any) are
credited to the same line in the CIES also as part of the gain or loss on disposal (i.e. netted off against the
carrying value of the asset at the time of disposal).  Any revaluation gains accumulated for the asset in the
Revaluation Reserve are transferred to the Capital Adjustment Account.
Amounts received for a disposal in excess of £10,000 are categorised as capital receipts.  The balance of
receipts is credited to the Capital Fund and can then only be used for new capital investment or to defray
debt.  Receipts are appropriated to the Reserve from the General Fund Balance in the Movement in
Reserves Statement.
The written-off value of disposals is not a charge against Council Tax, as the cost of non-current assets is
fully provided for under separate arrangements for capital financing.  Amounts are appropriated to the
Capital Adjustment Account from the General Fund Balance in the Movement in Reserves Statement.
xvi. Infrastructure Assets 
More information on the accounting for and disclosure around infrastructure assets held by the Council
can be found at note 15.
xvii. Public Private Partnership (PPP) and Similar Contracts 
PPP and similar contracts are agreements to receive services, where the responsibility for making available
the property, plant and equipment needed to provide the services passes to the contractor.  As the Council
is deemed to control the services that are provided under its schemes, and where ownership of the
property, plant and equipment will pass to the Council at the end of the contracts for no additional charge,
the Council carries the assets used under the contracts on its Balance Sheet as part of Property, Plant and
Equipment.
The original recognition of these assets at fair value (based on the cost to purchase the property, plant and
equipment) was balanced by the recognition of a liability for amounts due to the scheme operator to pay
for the capital investment.
Non-current assets recognised on the Balance Sheet are re-valued and depreciated in the same way as
property, plant and equipment owned by the Council.
The amounts payable to operators each year are analysed into five elements:
• Fair value of the services received during the year – debited to the relevant service in the
Comprehensive Income and Expenditure Statement (CIES);
• Finance Cost – an interest charge on the outstanding Balance Sheet liability, debited to the Financing
and Investment Income and Expenditure line in the CIES,  the interest charges are as follows:
o Dalkeith Schools  - 9.69%;
o Midlothian Primary Schools - 7.29%;
o Newbattle Community Campus - 5.06%;
o Residual Waste Treatment Plant, Millerhill – 15.43%;
Page 112 of 260

Page 113

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 54 
• Contingent rent – increases in the amount to be paid for the property arising during the contract,
debited to the Financing and Investment Income and Expenditure line in the CIES;
• Payment towards liability – applied to write down the Balance Sheet liability towards the PPP operator
(the profile of write-downs is calculated using the same principles as for a finance lease);
• Service charge and lifecycle replacement costs – proportion of the amounts payable is posted to the
Balance Sheet as a prepayment and then recognised as additions to Property, Plant and Equipment
when the relevant works are eventually carried out.
xviii. Provisions, Contingent Liabilities and Contingent Assets 
Provisions 
Provisions are made where an event has taken place that gives the Council a legal or constructive obligation
that probably requires settlement by a transfer of economic benefits or service potential, and a reliable
estimate can be made of the amount of the obligation.  For instance, the Council may be involved in a court
case that could eventually result in the making of a settlement or the payment of compensation.
Provisions are charged as an expense to the appropriate service line in the Comprehensive Income and
Expenditure Statement in the year that the Council becomes aware of the obligation, and are measured at
the best estimate at the balance sheet date of the expenditure required to settle the obligation, taking into
account relevant risks and uncertainties.
When payments are eventually made, they are charged to the provision carried in the balance sheet. 
Estimated settlements are reviewed at the end of each financial year – where it becomes less than probable
that a transfer of economic benefits will now be required (or a lower settlement than anticipated is made),
the provision is reversed and credited back to the relevant service.
Where some or all of the payment required to settle a provision is expected to be recovered from another
party (i.e. from an insurance claim), this is only recognised as income for the relevant service if it is virtually
certain that reimbursement will be received if the Council settles the obligation.
Contingent Liabilities 
A contingent liability arises where an event has taken place that gives the Council a possible obligation,
whose existence will only be confirmed by the occurrence or otherwise of uncertain future events not
wholly within control of the Council.  Contingent liabilities also arise in circumstances where a provision
would otherwise be made but either it is not definite that an outflow of resources will be required, or the
amount of the obligation cannot be measured reliably.
Contingent liabilities are not recognised in the balance sheet but disclosed in a note to the accounts.
Contingent Assets 
A contingent asset arises where an event has taken place that gives the Council a possible asset whose
existence will only be confirmed by the occurrence or otherwise of uncertain future events not wholly
within the control of the Council.
Contingent assets are not recognised in the balance sheet but disclosed in a note to the accounts where it
is probable that there will be an inflow of economic benefits or service potential.
xix. Reserves 
Reserves are created by transferring amounts out of the General Fund Balance.  When Expenditure to be
financed from a reserve is incurred, it is charged to the appropriate service in that year to score against the
Page 113 of 260

Page 114

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 55 
Surplus or Deficit on the Provision of Services in the Comprehensive Income and Expenditure Statement. 
The reserve is then transferred back into the General Fund Balance in the Movement in Reserves Statement
so that there is no net charge against Council Tax for the expenditure.
Certain reserves are kept to manage the accounting processes for non-current assets, financial instruments
and retirement and employee benefits and do not represent usable resources for the Council – these
reserves are explained in the relevant policies.
xx. Revenue Expenditure funded from Capital under Statute (Refcus) 
Expenditure incurred during the year that may be capitalised under statutory provisions but that does not
result in the creation of a non-current asset is charged as expenditure to the relevant service line in the
Comprehensive Income and Expenditure Statement in the year.  Where the Council has determined to
meet the cost of this expenditure from existing capital resources or by borrowing, a transfer in the
Movement in Reserves Statement from the General Fund Balance to the Capital Adjustment Account then
reverses out the amounts charged so there is no impact on the level of council tax.
xxi. VAT 
VAT payable is included as an expense only to the extent that it is not recoverable from HMRC.  VAT
receivable is excluded from income.
xxii. Fair Value Measurement of Non-financial Assets 
The Council measures some of its non-financial assets, such as Surplus Assets and some of its financial
instruments at fair value at each reporting date.  Fair value is the price that would be received to sell an
asset in an orderly transaction between market participants at the measurement date.  The fair value
measurement assumes the transaction to sell the asset takes place either:
• In the principal market for the asset; or
• In the absence of a principal market, in the most advantageous market for the asset.
The Council measures the fair value of an asset using the assumptions that market participants would use
when pricing the asset, assuming the market participants act in their economic best interest.
When measuring the fair value of a non-financial asset, the Council takes into account a market
participant’s ability to generate economic benefits by using the asset in its highest and best use or by selling
it to another market participant that would use the asset in its highest and best use.  
The Council uses valuation techniques that are appropriate in the circumstances and for which sufficient
data is available, maximising the use of relevant observable inputs and minimising the use of unobservable
inputs.
Inputs to the valuation techniques in respect of assets and liabilities for which Fair Value is measured or
disclosed in the Council’s financial statements are categorised within the fair value hierarchy, as follows:
• Level 1 inputs – quoted prices (unadjusted) in active markets for identical assets that the Council can
access at the measurement date;
• Level 2 inputs – inputs other than quoted prices included within Level 1 that are observable for the
asset, either directly or indirectly;
• Level 3 inputs – unobservable inputs for the asset. 
Page 114 of 260

Page 115

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 56 
2. Accounting Standards Issued, Not Yet Adopted 
The code requires disclosure of information relating to the impact of an accounting change that will be
required by a new standard that has been issued but not yet adopted.  This applies to the adoption of the
following new or amended standards within the 2023/24 code.
• Definition of Accounting Estimates (Amendments to IAS 8);
• Disclosure of Accounting Policies (Amendments to IAS 1 and IFRS Practice Statement 2);
• Deferred Tax related to Assets and Liabilities arising from a Single Transaction (Amendments to IAS
12);
• Updating a reference to the Conceptual Framework (Amendments to IFRS 3). 
The changes will be effective from the 1st April 2023 and none are expected to have a material impact on
the Council’s financial statements.
3. Critical judgements in Applying Accounting Policies 
In applying the accounting policies set out in Note 1, the Council has to make certain judgements about
complex transactions or those involving uncertainty about future events (see Note 4).  The accounting
policies considered and critical judgements made in the annual accounts are:
• Uncertainty over future funding - There is a high degree of uncertainty around future levels of funding
for local government, which may significantly impact the Council’s ability to maintain its property, plant
and equipment. The council has determined that this uncertainty is not yet sufficient to provide an
indication that the assets of the council might be impaired as a result of a reduction in funding and
subsequent required changes to investment and capital strategies
• Public-Private Partnerships (PPP) and similar type contracts - The Council has entered into PPP and
similar type contracts for the provision of educational buildings and waste facilities as detailed in Note
33. For each of these contracts the Council has considered the tests under IFRIC 12 and concluded the
following:
The Council is deemed to control the services provided under the scheme and ownership of schools
will pass to the Council at the end of the contract.  The educational buildings are therefore all
recognised as Property, Plant and Equipment on the Council’s Balance Sheet.
The Council is deemed to control 20% of the services provided under the Design, Build, Finance and
Maintain (DBFM) for the Residual Waste Treatment Plant (80% controlled by Edinburgh Council) and
is therefore recognised as Property, Plant and Equipment on the Council’s Balance Sheet.  The Council
is not deemed to control the Millerhill Food Waste Treatment Plant and has therefore concluded this
is a service concession.
The Council has therefore recognised assets in relation to PPP and similar type contracts on the
council’s balance sheet at a net book value of £195.625 million, with a corresponding liability in relation
to future payments to be made under the scheme of £92.432 million.
• Associates -  The Valuation Joint Board is included within the group accounts under the wider definition
of an “associate” although the council holds less than 20% of voting rights that is normally presumed
to confer significant influence.  This is in view of the funding arrangements in place whereby the Council
provides £0.565 million annually, and as such is considered to hold significant influence. Details of the
impact on the Group accounts is provided in Note 38. 
Page 115 of 260

Page 116

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 57 
4. Future Assumptions and Estimation Uncertainties 
The Annual Accounts contain estimated figures that are based on assumptions made by the Council about
the future or events that are otherwise uncertain.  Estimates are made taking into account historical
experience, current trends and other relevant factors.  The assumptions and other sources of estimation
uncertainty disclosed below relate to the estimates that require the Council’s most difficult, subjective or
complex judgements.  As the number of variables and assumptions affecting the possible future resolution
of the uncertainties increases, those judgements become more subjective and complex.  As a result,
balances cannot be determined with certainty and actual results could be materially different from the
assumptions and estimates.
The items in the Council’s Balance Sheet as at 31 March 2023 for which there is significant risk of material
adjustment in the forthcoming year are as follows:
Property, Plant and Equipment
Uncertainties Effect if Actual Results
Differ from Assumptions
The valuation of the Council’s property, plant and equipment which are
subject to revaluation are subject to significant estimation due to several
factors, including ongoing changes to estimates around the costs of replacing
existing assets, the market value fluctuation of comparable assets used for
valuation, the current condition and future maintenance costs of assets,
changes to regulatory standards and the remaining useful economic lives of
the assets. Given the material nature of the Council’s assets, there is a high
likelihood that changes in these estimates will result in material changes in the
valuation of assets on the balance sheet. The total value of the Council’s assets
at 31 March 2023 is outlined and broken down by asset category at note 14. 
2022/23 Revaluations 
In 2022/23, revaluations were undertaken for the following assets: 
31 March - Housing stock discount factor, schools, residential social care
properties, offices and commercial properties. The housing assets were
revalued on a EUV-SH basis and totalled £502.362 million and the schools were
revalued on a DRC basis and totalled schools £447.419 million, residential
social care properties were revalued on a mix of market value and DRC basis
and totalled £19.904 million, offices and commercial properties were valued
on a market value basis and totalled £36.867 million with a valuation
movement of £(21.270) million for housing, £35.071 million for schools,
£2.497 million for residential and social care properties and  £5.446 million for
offices and commercial properties (from previous valuation (4.06%) for
housing, 8.54% for schools, 14.96 % for residential and social care properties,
17.36% for offices and commercial properties). 
The changes in valuation in assets in 2022/23, compared to 2021/22,
represent updated information around the assets since the most recent full
valuation, in particular the cost of replacing assets based on indices for
schools, the changes in adjustments for social rent discounts for housing stock,
updating housing market information, and updated information on the indices
used to value residential and social care properties. 
Ongoing assessment of asset valuation 
In addition to full valuations of property, plant and equipment on a rolling
basis over a five year period, the council assesses all assets to ensure there are
no material changes that should drive an earlier valuation, to ensure that, in
The net book value of all
council property, plant and
equipment subject to
revaluation through the 5
year revaluation cycle is
£1.038.04 billion. Assets
revalued in 2022/23 totalled
£466.841 million before
revaluation. 
The impact of a 5% change
in valuation of these would
be £26.210 million, either
resulting in an increase or
decrease in the Council’s
revaluation reserve or an
additional impairment
charge. There would be no
impact on the Council’s
general fund. 
Given the wide ranging
nature of the assets under
revaluation, as well as the
differing and overlapping
estimates involved in the
valuations, it is not possible
for management to provide
an expected range of
estimate outcomes going
forward. However, given
the experience in past years
and materiality of the asset
values, it is expected that
these balances will continue
to be subject to change as
estimates are updated
annually. 
Page 116 of 260

Page 117

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 58 
Uncertainties Effect if Actual Results
Differ from Assumptions
line with the CIPFA code, assets are revalued with sufficient regularity to
ensure that the carrying amount does not differ materially from that which
would be determined using the current value at the end of the reporting
period. The council’s Corporate Estates Manager has determined in his
professional opinion that, at 31 March 2023, due to the inflationary impact on
School indices both High Schools and Primary Schools were subject to early
revaluation. The council has also continued to assess the valuation of its asset
base after the financial year end to ensure new information does not indicate
a change in valuation at the balance sheet date. 
Assets are depreciated over useful lives that are dependent on several
assumptions including the level of repairs and maintenance that will be
incurred in relation to individual assets. The current economic climate makes
it uncertain that the Council will be able to sustain its current spending on
repairs and maintenance, bringing into doubt the useful lives assigned to the
assets.
If the useful life of the asset
is reduced, depreciation
increases and the carrying
amount of the asset falls. It
is estimated that the annual
depreciation charge would
increase by £7.056m for
every year that useful lives
had to be reduced. 
Pension Obligation
Uncertainties Effect if Actual Results
Differ from Assumptions
Estimation of the net obligation to pay pensions depends on several complex
judgements relating to the discount rate used, the rate at which salaries are
projected to increase, changes in retirement ages, mortality rates and
expected returns on pension fund assets.  A firm of consulting actuaries is
engaged to provide the council with expert advice about the assumptions to
be applied.
The actuarial inputs into the pension obligation valuation are subject to annual
review, and have a significant impact on the potential valuation. Historically it
is common for small changes in the discount rate, salary assumption rate and
pension rate to have material impacts on the year-end valuations on a year to
year basis. We have outlined the potential impact of future changes below.
The pension asset at 31 March 2023 following the updated actuarial valuation
was £188.463 million, a gain from a liability to an asset on the balance sheet
of £242.673 million from 31 March 2022. This was mainly driven by a 2.05%
increase in the discount rate, which has served to reduce the employer’s
obligations leading to a gain on the balance sheet. 
Given the history of significant changes to pension obligation valuations in the
past, the ongoing sensitivity to future changes, and the requirement to update
assumptions annually, the Council expects future liabilities to continue to
change significantly going forward. 
For sensitivity purposes, we estimate that a one year increase in life
expectancy would approximately increase the Employer’s Defined Benefit
Obligation by around 4%, approximately £20.409 million. In practice the actual
cost of a one year increase in life expectancy will depend on the structure of
the revised assumption (i.e. if improvements to survival rates predominantly
apply at younger or older ages).
More information on the key assumptions used in the actuarial valuation of
the estimates is available in note 35 to the accounts, including information on
the key assumptions, risks, sensitivities and restrictions on the amount on the
The effects of the net
pension obligation of
changes in individual
assumptions can be
measured.  For instance, it is
estimated that a one year
increase in life expectancy
would approximately
increase the Employers
Defined Benefit Obligation
by around 3-5%. However
the assumptions interact in
complex ways.
During 2022/23 the
Council’s actuary advised
that the net pension’s
obligation had increased by
£242.673 million because of
estimates being corrected
as a result of experience of
£(56.382) million and
£299.055 million
attributable to updating of
the assumptions.
Page 117 of 260

Page 118

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 59 
Uncertainties Effect if Actual Results
Differ from Assumptions
balance sheet arising from IFRIC 14. An update is also included in this note on
the latest development around several equalisation adjustments to pension
obligation which have occurred in LGPS and may continue to materially impact
the valuation of the Council’s obligation going forward. 
Arrears
Uncertainties Effect if Actual Results
Differ from Assumptions
As at 31 March the Council has Council Tax and Non-Domestic Rates debt due
of £45.906 million. Management reviewed this balance at 31 March and
determined that an allowance for doubtful debts, detailed in Note 23, of
£41.213 million was appropriate based upon historical assessment of
recoverability/review of individual balances and correspondence with third
parties at year-end. However, it is recognised that in the current economic
climate and taking into account the impact of Covid-19 there is increased
uncertainty around the recoverability of debtor balances. Management has
continued to review all material outstanding balances at the year-end
subsequent to 31 March, and has not determined any further allowance is
required based on recovery to date.
If collection rates were to
deteriorate then this will
result in an increase in the
provision required i.e., 1%
would require an increase of
£0.412 million, 3% an
increase of £1.236 million
and 5% an increase of
£2.061 million.  
5. Events after the Reporting Period 
The Unaudited Accounts were authorised for issue by the Acting Chief Financial Officer on 26th June 2023.
Events taking place after this date are not reflected in the annual financial statements or notes.  Where
events taking place before this date provided information about conditions existing at 31 March 2023, the
figures in the financial statements and notes have been adjusted in all material respects to reflect the
impact of this information. 
Page 118 of 260

Page 119

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 60 
6. Note to the Expenditure and Funding Analysis 
Adjustments between Funding and Accounting Basis 2022/23
Adjustments from General Fund to
arrive at the Comprehensive
Income and Expenditure
Statement Amounts
Adjustments
for Capital
Purposes 
Net change for
pension
adjustments 
Other Adjustments  
Total
Adjustments 
£000 £000 £000 £000
Management and Members 0 138 (8) 130
Children's Services, Partnerships &
Communities 101 751 (111) 741
Education 16,850 11,269 1,529 29,648
Adult Health and Social Care – Non-
Delegated 756 0 36 792
Midlothian Integrated Joint Board 935 2,580 57 3,572
Place 8,446 3,284 3,063 14,793
Corporate Solutions  1,945 566 (4,513) (2,002)
Housing Revenue Account 30,156 114 0 30,270
Joint Boards 0 0 0 0
Central Costs 84 0 0 84
Non-Distributable Costs 0 0 (11) (11)
Net Cost of Services 59,273 18,702 42 78,017
Other income and expenditure
from the  Expenditure and Funding
Analysis
(36,732) 1,712 (11) (35,031)
Difference between General Fund
Surplus or Deficit and CIES Surplus
or Deficit on the Provision of
Services
22,541 20,414 31 42,986 
Adjustments between Funding and Accounting Basis 2021/22
Adjustments from General Fund to
arrive at the Comprehensive
Income and Expenditure
Statement Amounts
Adjustments
for Capital
Purposes 
Net change for
pension
adjustments 
Other Adjustments  
Total
Adjustments 
£000 £000 £000 £000
Management and Members 0 123 (13) 110
Children's Services, Partnerships &
Communities 338 830 46 1,214
Education 16,207 12,371 566 29,144
Adult Health and Social Care – Non-
Delegated (248) 0 37 (211)
Midlothian Integrated Joint Board 1,165 2,463 104 3,732
Place 8,458 4,287 1,591 14,336
Corporate Solutions  1,930 604 (2,731) (197)
Housing Revenue Account (52,138) 593 0 (51,545)
Joint Boards 0 0 0 0
Central Costs 46 0 0 46
Non-Distributable Costs 0 0 (26) (26)
Net Cost of Services (24,242) 21,271 (426) (3,397)
Other income and expenditure
from the  Expenditure and Funding
Analysis
(28,238) 3,030 (10) (25,218)
Difference between General Fund
Surplus or Deficit and CIES Surplus
or Deficit on the Provision of
Services
(52,480) 24,301 (436) (28,615)
Page 119 of 260

Page 120

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 61 
Adjustments for Capital Purposes 
This column adds in depreciation, impairment and revaluation gains and losses in the services line, and for:
• Other operating expenditure – adjusts for capital disposals with a transfer of income on disposal of
assets and the amounts written off for those assets;
• Financing and investment income and expenditure – the statutory charges for capital financing i.e.
loans fund repayments and other revenue contributions are deducted from other income and
expenditure as these are not chargeable under generally accepted accounting practices;
• Taxation and non-specific grant income expenditure – capital grants are adjusted for income not
chargeable under generally accepted accounting practices.  Revenue grants are adjusted from those
receivable in the year to those receivable without conditions or for which conditions were satisfied
throughout the year.  The taxation and non-specific grant income and expenditure line is credited with
capital grants receivable in the year without conditions or for which conditions were satisfied in the
year.
Net Change for the Pensions Adjustments 
Net change for the removal of pension contributions and the addition of IAS 19 Employee Benefits
pension related expenditure and income:
• For services – this represents the removal of the employer pension contributions made by the
Council as allowed by statute and the replacement with current service costs and past service costs;
• For financing and investment income and expenditure – the net interest on the defined benefit
liability is charged to the CIES.
Other Adjustments 
Other adjustments between amounts debited/credited to the Comprehensive Income and Expenditure
Statement and the amounts payable/receivable to be recognised under statute:
• For services – the amount by which officer remuneration charged to the CIES on an accruals basis is
different from remuneration chargeable in the year in accordance with statutory requirements;
• For financing and investment income and expenditure – this is an effective interest adjustment on
the Council’s Lender Option/Borrower Option (LOBO) debt.
7. Adjustments between the Accounting Basis and Funding Basis under
Regulations 
This note details the adjustments that are made to the total comprehensive income and expenditure
recognised by the Council in the year in accordance with proper accounting practice to arrive at the
resources that are specified by statutory provisions as being available to the Council to meet future capital
and revenue expenditure. The following sets out a description of the reserves that the adjustments are
made against.
General Fund Balance 
The General Fund is the statutory fund into which all the receipts of the Council are required to be paid
and out of which all liabilities of the Council are to be met, except to the extent that statutory rules might
provide otherwise.  These rules can also specify the financial year in which liabilities and payments should
impact on the General Fund balance, which is not necessarily in accordance with proper accounting
practice.  The General Fund balance therefore summarises the resources that the Council is statutorily
Page 120 of 260

Page 121

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 62 
empowered to spend on its services or on capital investment (or the deficit of resources that the Council
is required to recover) at the end of the financial year.
Housing Revenue Account (HRA) Balance 
The HRA balance reflects the statutory obligation to maintain a revenue account for local authority council
housing provision in accordance with Part VI of the Local Government and Housing Act 1989.  It contains
the balance of income and expenditure as defined by the 1989 Act that is available to fund future
expenditure in connection with the Council’s landlord function or (where in deficit) that is required to be
recovered from tenants in future years.
Adjustments between Accounting Basis and Funding
Basis under Regulations
General
Fund
Reserve 
Housing
Revenue
Account
Total
Useable
Reserves
Total
Unusable
Reserves
2022/23 £000 £000 £000 £000
Adjustments to the Revenue Resources    
Amounts by which income and expenditure included in
the Comprehensive Income and Expenditure Statement
are different from revenue for the year calculated in
accordance with statutory requirements:    
• Pensions Costs  (20,290) (124) (20,414) 20,414
• Financial Instruments 10 0 10 (10)
• Short-term Accumulated Absences (42) 0 (42) 42
• Reversal of entries included in the surplus or
deficit on the provision of services in relation to
capital expenditure
(29,033) (30,155) (59,188) 59,188
Total Adjustments to Revenue Resources (49,355) (30,279) (79,634) 79,634
Adjustments between Revenue and Capital Resources    
Net gain or loss on sale of non-current assets (338) 0 (338) 338
Statutory provision for the repayment of debt 5,553 3,693 9,246 (9,246)
Net revenue expenditure financed from capital under
statute (REFFCUS) (84) 0 (84) 84
Total Adjustments between Revenue and Capital
Resources 5,131 3,693 8,824 (8,824)
Adjustments to Capital Resources    
Application of capital grants to finance capital
expenditure 27,824 0 27,824 (27,824)
Total Adjustments to Capital Resources 27,824 0 27,824 (27,824)
Total Adjustments (16,400) (26,586) (42,986) 42,986 
Page 121 of 260

Page 122

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 63 
Adjustments between Accounting Basis and Funding
Basis under Regulations
General
Fund
Reserve 
Housing
Revenue
Account
Total
Useable
Reserves
Total
Unusable
Reserves
2021/22 £000 £000 £000 £000
Adjustments to the Revenue Resources    
Amounts by which income and expenditure included in
the Comprehensive Income and Expenditure Statement
are different from revenue for the year calculated in
accordance with statutory requirements:    
• Pensions Costs  (23,625) (676) (24,301) 24,301
• Financial Instruments 10 0 10 (10)
• Short-term Accumulated Absences 426 0 426 (426)
• Reversal of entries included in the surplus or
deficit on the provision of services in relation to
capital expenditure
(27,850) 52,138 24,288 (24,288)
Total Adjustments to Revenue Resources (51,039) 51,462 423 (423)
Adjustments between Revenue and Capital Resources    
Net gain or loss on sale of non-current assets (5,236) (131) (5,367) 5,367
Statutory provision for the repayment of debt 3,287 5,670 8,957 (8,957)
Net revenue expenditure financed from capital under
statute (REFFCUS)
(46) 0 (46) 46
Capital Expenditure Financed from Revenue Balances 43 25,000 25,043 (25,043)
Total Adjustments between Revenue and Capital
Resources
(1,952) 30,539 28,587 (28,587)
Adjustments to Capital Resources    
Application of capital grants to finance capital
expenditure
24,827 0 24,827 (24,827)
Total Adjustments to Capital Resources 24,827 0 24,827 (24,827)
Total Adjustments (28,164) 82,001 53,837 (53,837)
8. Movement in Earmarked Reserves 
This note sets out the amounts set aside from the General Fund in earmarked reserves to provide financing
for future expenditure plans and the amounts posted back from earmarked reserves to meet general fund
expenditure in 2022/23. 
Balance
at 1
April
2021
Transfers
out
2021/22
Transfers
in
2021/22
Balance
at 31
March
2022
Transfers
in
2022/23
Transfers
Out
2023/23
Balance
at 31
March
2023 
£000 £000 £000 £000 £000 £000 £000
Scheme of Devolved Budget
Management carry forwards (23,607) 23,607 (18,800) (18,800) (16,012) 18,800 (16,012)
Business Transformation
Programme (1,568) 460 (228) (1,336) 0 267 (1,069)
Management Policy (486) 486 (1,123) (1,123) 0 1123 0
Training Budget (199) 199 0 0 0 0 0
Set aside to balance 2022/23
Budget 0 0 (5,576) (5,576) (1,166) 5,576 (1,166)
Total Earmarked Reserves (25,860) 24,752 (25,727) (26,835) (17,178) 25,766 (18,247)
Vat Claim not yet settled 0 0 0 0 (6,839) 0 (6,839)
Non-Earmarked Reserves (3,812) 0 (1,785) (5,597) (5,704) 1,424 (9,877)
Total General Fund Balance (29,672) 24,752 (27,512) (32,432) (29,721) 27,190 (34,963) 
Page 122 of 260

Page 123

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 64 
9. Other Operating Income and Expenditure 
2021/22  2022/23
£000 Other Operating Income and Expenditure £000
5,367 (Gains)/Losses on disposal of non-current assets 338
5,367 Total 338 
10.  Financing and Investment Income and Expenditure 
2021/22  2022/23
£000 Financing and Investment Income and Expenditure £000
16,780 Interest payable and similar charges 15,268
3,030 Net interest on the net defined benefit liability (asset) 1,712
(1,942) Interest receivable and similar income (4,412)
17,868 Total  12,568 
11.  Taxation and Non-Specific Grant Income 
2021/22  2022/23
£000 Taxation and Non-Specific Grant Income £000
50,355 Council Tax Income 53,315
18,838 Non-domestic Rates Income  24,813
166,694 Non-ring-fenced Government Grants 170,540
24,827 Capital Grants and Contributions (note 12) 27,824
260,714 Total  276,492 
12.  Grant Income 
The Council credited the following grants, contributions and donations to the Comprehensive Income and
Expenditure Statement in 2022/23.
Page 123 of 260

Page 124

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 65 
2021/22  2022/23
£000 Grant Income £000 
Credited to Taxation and Non-Specific Grant Income and Expenditure: 
6,986 General Capital Grant 7,850
7,708 Affordable Housing Supply Programme 9,822
4,967 Developer Contributions 5,256
689 General Capital Grant – Early Years Childcare 664
2,000 Capital Fund 3000
2,179 Scottish Government Grant - Other 1,017
298 Other Capital Grants and Contributions 215
24,827 Total 27,824 
Credited to Services: 
20,047 Housing Benefit Subsidy 18,172
13,125 Early Years Expansion Grant 11,411
2,691 Unitary Charge Funding 2,951
2,650 Pupil Equity Funding 2,424
0 Unaccompanied Asylum Seeking Children 1,626
1,562 Community Justice Grant 1,407
1,079 South East Improvement Collaborative Grant 1,172
626 Energy Efficient Scotland 937
631 Penicuik Town Hall Improvement 0
444 McMillan Funding for Improving the Cancer Journey (ICJ) Project (1) 599
0 UK Shared Prosperity Funds 563
2,746 Other Entities and Individuals 4,765
45,601 Total 46,027
1. £0.444 million for McMillan Funding reflected in Other Entities and Individuals in 2021/22 Annual Accounts due to being below
reporting materiality threshold. 
13.  Expenditure and Income Analysed by Nature 
The Group and Council’s expenditure and income, which includes adjustments between the funding and
accounting basis, is analysed as follows:
2021/22  2022/23
£000 Expenditure and Income Analysis £000 
Expenditure 
193,892 Employee Expenses  208,496
215,472 Other Service Expenses 239,147
(24,288) Depreciation, amortisation and impairment 59,189
15,639 Interest payments 15,268
5,366 Gain/(Loss) on the disposal of non-current assets 338
(4,300) Share of operating results of associates and joint ventures 5,665
401,781 Total Expenditure 528,103 
Income  
(79,212) Fees, Charges and Other Service Income (95,616)
(801) Interest and Investment Income (4,412)
(50,354) Income from council tax (53,315)
(311,830) Government Grants and Contributions (333,119)
(442,197) Total Income (486,462)
(40,416) Total  41,641
Page 124 of 260

Page 125

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 66 
14.  Property Plant and Equipment 
Movements on Balances 
Movements in 2022/23
Council
Dwellings
Buildings
Land
Vehicles, Plant
and
Equipment
Community 
Assets
Assets Under
Construction
Surplus Assets
Total Property,
Plant &
Equipment 
PPP &
Similar
Contract
Assets *
Cost or Valuation £000 £000 £000 £000 £000 £000 £000 £000  £000
Balance at 1 April 2022 501,545 527,035 17,289 45,772 8,604 27,868 1,077 1,129,190  182,967
Additions 18,300 5,677 121 4,798 228 38,157 0 67,281  11
Revaluation increases/(decreases) recognised in the
Revaluation Reserve
(2,466) 42,642 247 0 0 0 0 40,423  15,044
Revaluation increases/(decreases) recognised in the
Surplus/Deficit on the Provision of Services
(19,227) 363 37 0 0 0 0 (18,827)  0
De-recognition – Disposals (206) (346) (307) (1,080) 0 0 0 (1,939)  0
Reclassification of Assets 14,859 787 (7) 0 0 (15,639) (250) (250)  0
Balance at 31 March 2023 512,805 576,158 17,380 49,490 8,832 50,386 827 1,215,878  198,022
Accumulated Depreciation and Impairment          
Balance at 1 April 2022 (1,100) (18,155) 0 (29,159) (38) 0 0 (48,452)  (1,598)
Depreciation Charge (11,166) (22,508) 0 (4,442) (18) 0 0 (38,134)  (2,870)
Depreciation written out to the Revaluation Reserve 350 23,450 0 0 0 0 0 23,800  2,071
Depreciation written out to the Surplus/Deficit on the
Provision of Services
238 1,211 0 0 0 0 0 1,449  0
De-recognition - Disposals 206 200 0 1,025 0 0 0 1,431  0
Balance at 31 March 2023 (11,472) (15,802) 0 (32,576) (56) 0 0 (59,906)  (2,397)
Net Book Value          
At 31 March 2023 501,333 560,356 17,380 16,914 8,776 50,386 827 1,155,972  195,625
At 31 March 2022 500,445 508,880 17,289 16,613 8,566 27,868 1,077 1,080,738  181,369
* PPP and Similar Contract Assets included in ‘Land’ and ‘Buildings’ Total 
Page 125 of 260

Page 126

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 67 
Movements in 2021/22
Council
Dwellings
Buildings
Land
Vehicles, Plant
and
Equipment
Community 
Assets
Assets Under
Construction
Surplus Assets
Total Property,
Plant &
Equipment 
PPP &
Similar
Contract
Assets *
Cost or Valuation £000 £000 £000 £000 £000 £000 £000 £000  £000
Balance at 1 April 2021 414,883 481,643 17,089 37,657 8,204 32,846 1,077 993,399  173,467
Additions 14,015 5,586 17 9,204 91 30,028 0 58,941  95
Revaluation increases/(decreases) recognised in the
Revaluation Reserve
10,249 31,374 (12) 0 301 0 0 41,912  9,405
Revaluation increases/(decreases) recognised in the
Surplus/Deficit on the Provision of Services
42,722 519 (20) 0 8 0 0 43,229  0
De-recognition – Disposals (246) (6,083) (256) (1,089) 0 0 0 (7,674)  0
Reclassification of Assets 19,922 13,996 471 0 0 (35,006) 0 (617)  0
Balance at 31 March 2022 501,545 527,035 17,289 45,772 8,604 27,868 1,077 1,129,190  182,967
Accumulated Depreciation and Impairment          
Balance at 1 April 2021  (17,910) (14,299) 0 (27,120) (170) 0 0 (59,499)  (799)
Depreciation Charge (9,339) (21,901) 0 (2,993) (68) 0 0 (34,301)  (2,712)
Depreciation written out to the Revaluation Reserve 7,278 16,759 0 0 200 0 0 24,237  1,913
Depreciation written out to the Surplus/Deficit on the
Provision of Services
18,756 422 0 0 0 0 0 19,178  0
De-recognition - Disposals 115 864 0 954 0 0 0 1,933  0
Balance at 31 March 2022 (1,100) (18,155) 0 (29,159) (38) 0 0 (48,452)  (1,598)
Net Book Value          
At 31 March 2022 500,445 508,880 17,289 16,613 8,566 27,868 1,077 1,080,738  181,369
At 31 March 2021 396,973 467,344 17,089 10,537 8,034 32,846 1,077 963,462  172,668
* PPP and Similar Contract Assets included in ‘Land’ and ‘Buildings’ Total 
Page 126 of 260

Page 127

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 68 
Depreciation 
The following useful lives are used in the calculation of depreciation for the categories of assets, except
where the useful like is known to be different from these as a consequence of a Council decision:
• Council Dwellings – 40 to 60 years;
• Buildings – 10 to 60 years;
• Vehicles, Plant and Equipment – 5 to 10 years.
Capital Commitments 
As at 31 March 2023, the Council has entered into a number of contracts for the construction or
enhancement of property, plant and equipment in 2023/24 and future years budgeted to cost £57.731
million (31 March 2022 £41.193 million). The main contractual commitments are:
Capital Commitments Original
Contractual
Commitment
£000
Outstanding at
31 March  23
£000
Housing Revenue Account Programme  
• Phase 3/4 New Social Housing: Site 109 Conifer Road, Mayfield 14,770 9,943
• Phase 3/4 New Social Housing: Site 116 Newmills Road, Dalkeith 18,575 2,951
• Phase 3/4 New Social Housing: Site 122 High Street, Bonnyrigg 5,244 5,011
• Phase 3/4 New Social Housing: Site 131 Burnbrae, Hopefield  6,703 2,843
• Phase 3/4 New Social Housing: Site 150 Roslin Expansion (Barrat) 8,290 5,923
• Phase 3/4 New Social Housing: Site 32/34 Newbyres Crescent 15,521 14,286
General Fund  
Woodburn Primary School Extension and Refurbishment 13,340 13,064
Other Capital Commitments 93,679 3,710
Total Contractual Commitment 176,122 57,731 
Revaluations 
Valuations of the above categories of assets are undertaken by independent expert valuers engaged by the
Council over a five-year rolling programme by Chartered Surveyors of the Council’s Estates department, in
accordance with the Statement of Asset Valuation Practice and Guidance Notes of the Royal Institution of
Chartered Surveyors.  
In 2022/23 valuations were undertaken for Housing stock discount factor, schools, residential social care
properties, offices and commercial properties. Most asset valuations were based on either a depreciated
replacement cost (DRC) basis or market value and resulted in a net upwards revaluation of assets of
£46.969 million.
In addition to formal valuations of property, plant and equipment on a rolling basis over a five year period,
the Council assesses all assets to ensure there are no material changes that should drive an earlier
Page 127 of 260

Page 128

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 69 
valuation, to ensure that, in line with the CIPFA code, assets are revalued with sufficient regularity to ensure
that the carrying amount does not differ materially from that which would be determined using the current
value at the end of the reporting period. The Council’s valuers have determined in their professional
opinion that, at 31 March 2023, due to the inflationary impact on the School indices High Schools and
Primary Schools were subject to early revaluation. The Council has continued to assess the valuation of its
asset base subsequent to the financial year-end as summarised in note 4 to these financial statements.
15.  Infrastructure Assets 
The Council’s infrastructure assets have been recorded on the Balance Sheet at depreciated historic cost.
A useful life of 15 years is applied to these assets and used in the calculation of the annual depreciation
charge, based on the Council’s assessment of the average useful economic life of these assets, with the
exception of where the useful life is known to be different from this amount as a consequence of a Council
decision. 
On 29 August 2022 the Scottish Government confirmed in Local Government Finance Circular 09/2022 that
it has provided a temporary statutory override to the accounting and disclosure requirements related to
infrastructure assets in local government financial statements, whilst more permanent updates are
developed within the CIPFA/LASAAC Code of Practice for Local Authority Accounting (“the Code”). The
allowed changes are applicable for the 2021/22 financial year through to the 31 March 2024 financial year. 
The Council has applied both statutory overrides for infrastructure assets: 
• Statutory Override 1: For accounting periods commencing from 1 April 2021 until 31 March 2024 a
local authority is not required to report the gross cost and accumulated depreciation for infrastructure
assets. 
• Statutory Override 2: For accounting periods commencing from 1 April 2010 until 31 March 2024 the
carrying amount to be derecognised in respect of a replaced part of an infrastructure asset is to be
taken to be and accounted for as a nil amount. No subsequent adjustment shall be made to the carrying
amount of the asset with respect to that part.
2021/22  2022/23
£000 Infrastructure Assets £000
29,562 Net carrying amount at 1 April 31,375
(3,488) Depreciation (3,501)
5,301 Additions 6,945
31,375 Balance outstanding at 31 March 34,819 
16.  Heritage Assets 
The Council’s chains and badges of office are the main heritage assets and have been included in the
Balance Sheet at reinstatement cost, obtained from the Council’s insurer.
2021/22  2022/23
£000 Heritage Assets Cost or Valuation Movement £000
324 Net Carrying amount at 1 April 329 
(3) Depreciation (3)
8 Additions 7
0 Revaluations and Restatements 125
329 Net Carrying amount at 31 March 458 
Page 128 of 260

Page 129

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 70 
17.  Intangible Assets 
The Council accounts for its software as intangible assets, to the extent that the software is not an integral
part of a particular IT system and accounted for as part of the hardware item Property, Plant and
Equipment.  The intangible assets include software licences, warranties and internally generated assets.  
The movement on Intangible Asset balances during the year is as follows:
2021/22  2022/23
£000 Intangible Assets Movement in Balances £000 
Balance at start of year: 
2,794 Gross carrying amounts 2,921
(2,246) Accumulated amortisation (2,573)
548 Net carrying amount at 1 April 348
127 Additions - Purchases 25
(327) Amortisation for the period (171)
348 Net carrying amount at 31 March 202 
Comprising: 
2,921 Gross carrying amounts 2,946
(2,573) Accumulated amortisation (2,744)
348 Net carrying amount 31 March 202 
18.  Long-term Debtors 
2021/22  2022/23
£000 Long-Term Debtors £000
3,717 Prepayment to PPP Contractor 4,138
50 Pacific Shelf 52
3,767 Total Long-Term Debtors 4,190 
19.  Financial Instruments 
Categories of Financial Instruments 
The following categories of financial instruments are carried in the Balance Sheet:
Financial Assets 
31 Mar 2022     31 Mar 2023  
Non-
current
Current Total   Non-
current
Current Total 
£000 £000 £000 Financial Assets Category £000 £000 £000 Note
2,032 43,236 45,268 Short/Long-term
Deposits  (1)
Amortised Cost 0 20,122 20,122 See
Below
0 13,136 13,136 Debtors Amortised Cost 0 36,994 36,994 23
6,476 0 6,476 Long-term
investments
Fair Value
through Other
Comprehensive
income
11,693 0 11,693 See
Below
8,508 56,372 64,880 Total Financial Assets  11,693 57,116 68,809 
0 23,545 23,545 Debtors not defined
as financial
instruments 
0 3,817 3,817 18 &
23
8,508 79,917 88,425 Total  11,693 60,933 72,626 
Page 129 of 260

Page 130

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 71 
The Short-term and Long-term deposits on the balance sheet comprises: 
31 Mar 2022    31 Mar 2023 
Long-
term
Short-term Total  Long-term Short-term Total
£000 £000 £000 Deposits £000 £000 £000
2,032 28,241 30,273 Other Local Authorities 0 0 0
0 14,995 14,995 Commercial Banks/Building Societies 0 20,122 20,122
2,032 43,236 45,268 Total Deposits (1) 0 20,122 20,122
1. In 2021/22 there was a misclassification of £50.214 million in short-term investments which should have been
reflected in Cash and Cash Equivalents.
Financial Liabilities 
31 Mar 22     31 Mar 23  
Non-
current
Current Total   Non-
current
Current Total 
£000 £000 £000 Financial Liabilities Category £000 £000 £000 Note
322,365 3,865 326,230 Borrowings Amortised Cost 321,490 3,195 324,685 See
below
79,817 2,912 82,729 PPP Liability  Amortised Cost 76,699 3,120 79,819 33
12,614 573 13,187 PPP Donated Asset
Account Liability
Amortised Cost 12,040 573 12,613 33
0 8,603 8,603 Creditors  Amortised Cost 0 29,623 29,623 25
414,796 15,953 430,749 Total Financial
Liabilities  410,229 36,511 446,740 
0 44,893 44,893 Creditors not defined
as financial
instruments 
0 28,923 28,923 25
414,796 60,846 475,642 Total  410,229 65,434 475,663 
The Council’s borrowing is presented in the Balance Sheet as the outstanding principal repayable (plus
accrued interest) and interest charged to the Comprehensive Income and Expenditure Statement is the
amount payable for the year according to the loan agreement.  Borrowing is classed as either a long-term
liability, repayable after twelve months or longer, or a current liability if it is repayable within twelve
months. The external borrowing as shown in the Balance Sheet comprises: 
31 Mar 2022    31 Mar 2023 
Long-term Short-term Total  Long-term Short-term Total
£000 £000 £000 External Borrowings £000 £000 £000
284,633 2,662 287,295 PWLB Loans 284,580 2,008 286,588
20,559 284 20,843 Lender Option/Borrower Option
(LOBO) Loans
20,549 284 20,833
17,173 919 18,092 Loans from commercial lenders and
other local authorities
16,361 903 17,264
322,365 3,865 326,230 Total Borrowings 321,490 3,195 324,685 
Loans Fund Deferral of Repayments
Loans Fund Principal repayments were deferred in 2022/23 under the Local Government Finance Circular
5/2022 provisions.  The term over which deferred repayments will be repaid are in line with the
provisions of the circular, as follows:- 
Page 130 of 260

Page 131

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 72 
Deferred Principal Repayments – Loans Fund £000’s
Within 1 year 386
Within 2 to 5 Years 940
Within 6 to 10 Years 835
Within 11 to 15 Years 310
Within 16 to 20 Years 339
Total 2,810 
Investments Designated at Fair Value through Other Comprehensive Income 
Fair value of equity instruments designated at Fair Value through Other Comprehensive Income include
the following:
31 Mar
2022 
Input Level in Fair
Value Hierarchy
(see note 1 viii)
31 Mar
2023
£000 Non-Current Assets (Long-term)  £000
4,642 Equity Shareholding in Lothian Buses  Level 2 5,758
324 Subordinated Debt Subscription in Newbattle DBFMCo  Level 3 325
1,510 Midlothian Energy Limited Shareholding Level 3 5,610
6,476 Total  11,693 
Lothian Buses Plc
Midlothian Council holds a 5.5% shareholding in Lothian Buses plc, a company incorporated in January 1986
under the terms of the Transport Act 1985 to operate buses in the City of Edinburgh and its surrounding
area.
The valuation basis for the Council’s shareholding (350,000 £1 ordinary shares) is calculated as net share
of equity attributable to equity holders, in line with the published results for the year ended 31 December
2022.  The IAS 19 Pension Asset/Liability has now been removed from calculations due to its volatility, as
demonstrated in the on-year movement in the transfer to/from reserves figure in the table below.  Note
36 provides more detail on the potential guarantee liability associated with investment.
Year to 31
Dec 21 
Year to 31
Dec 22
£000  £000 
Profit/(Loss): 
(7,158) Profit/(Loss) before taxation 5,978
(3,398) Taxation (1,443)
(10,556) Profit/(Loss) after Tax 4,535 
Other Relevant Financial Information: 
140,631 Revenue 165,844
0 Ordinary Dividend 0
59,574 Transfer to/(from) reserves (5,271)
84,862 Equity attributable to equity holders (excluding IAS 19 Pension
Asset/Liability)
105,277 
Page 131 of 260

Page 132

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 73 
Newbattle DBFMco Ltd
In 2017/18, the Council subscribed £0.333 million of subordinated debt in Newbattle DBFMco Limited, a
company set up specifically to deliver the Council’s Schools Newbattle Community Campus project.
Whilst the investment is sellable in the secondary market, the valuation basis for the Council’s shareholding
(nominal value of loan stock £0.333 million) is calculated based on the subscription value as there is no
equivalent market data to estimate resale value.
The principal on this investment will be repaid fully over the 25-year project life.  Interest will be paid
biannually at 10.5% coupon based on the average principal outstanding over the relevant 6-month period.
Midlothian Energy Ltd
In 2021/22, the Council entered into a 50:50 joint venture with Vattenfall Heat UK to create Midlothian
Energy Limited, a company set up specifically to generate, distribute and supply energy within Midlothian.
The carrying value of the Council investment in Midlothian Energy Limited represents the funds invested
in 2022.  The published results for Midlothian Energy Limited for the year ended 31 December 2022 are
summarised below.  
Year to 31
Dec 21 
Year to 31
Dec 22
£000  £000 
Profit/(Loss): 
(1,787) Profit/(Loss) before taxation (945)
(0) Taxation 0
(1,787) Profit/(Loss) after Tax (945) 
Other Relevant Financial Information: 
0 Shares Issued During the Period 3,020
(1,787) Accumulated Losses (2,752)
(1,787) Total Equity  268 
Income, Expenses, Gains and Losses 
2021/22 2021/22  2022/23 2022/23
Surplus or
Deficit on
the
Provision of
Services
Other
Comprehensive
Income and
Expenditure 
Surplus or
Deficit on
the
Provision of
Services
Other
Comprehensive
Income and
Expenditure
£000 £000  £000 £000  
Net gains/losses on:  
(857) 0 Investments in equity instruments designated at
fair value through other comprehensive income
1,117 0
(857) 0 Total net gains/(losses) 1,117 0     
Interest Revenue:  
0 1,141 Financial assets measured at amortised cost 0 3,260
0 0 Other financial assets measured at fair value
through other comprehensive income
0 0
0 1,141 Total Interest Revenue 0 3,260     
0 9,452 Interest Expense 0 9,868     
Fee Expense:  
0 108 Financial assets or financial liabilities that are not at
fair value through profit and loss
0 122
0 108 Total Fee Expense 0 122
Page 132 of 260

Page 133

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 74 
Fair Values of Assets and Liabilities 
Except for the financial assets carried at fair value through other comprehensive income, all other financial
liabilities and financial assets held by the Council are carried in the Balance Sheet at amortised cost.  The
fair values calculated for these instruments are as follows: 
31 Mar 22   31 Mar 23
Carrying
Amount
Fair Value
(New Loan
Rate) 
Carrying
Amount
Fair Value
(New Loan
Rate)
£000 £000 Financial Liabilities £000 £000
287,295 299,145 PWLB Loans (Level 2) 286,588 205,583
20,843 29,781 Lender Option/Borrower Option
(LOBO) Loans (Level 2)
20,833 20,282
18,092 18,253 Loans from commercial lenders and
other local authorities (Level 2)
17,264 14,716
8,603 8,603 Creditors 29,623 29,623
82,729 82,729 PPP Finance Lease Liability 79,819 79,819
13,187 13,187 PPP Donated Asset Account Liability 12,613 12,613
430,749 451,698 Total Financial Liabilities 446,740 362,636 
The fair value for borrowings have been arrived at using a discounted cash flow analysis, with the most
significant inputs being the discount rate.  
The fair value of borrowing is lower than the carrying amount because the Council’s portfolio of loans
includes a number of loans where the interest rate payable is lower than the prevailing rates at balance
sheet date. The commitment to pay interest below current market rates reduces the amount the Council
would have to pay if the lender requested or agreed to early repayment of the loans. 
31 Mar 22   31 Mar 23
Carrying
Amount
Fair Value  Carrying
Amount
Fair Value
£000 £000 Financial Assets £000 £000
45,268 45,269 Short/Long-term Deposits 20,122 20,122
13,136 13,136 Debtors 36,994 36,994
58,404 58,405 Total Financial Assets 57,116 57,116 
Short-term debtors and creditors are carried at cost as this is a fair approximation of their value.
The fair value for financial liabilities and financial assets that are not measured at fair value can be assessed
by calculating the present value of the cash flows that will take place over the remaining term of the
instruments, using the following assumptions:
Financial Assets Financial Liabilities
- The valuation of fixed term deposits (maturity
deposits) is made by comparison of the fixed
term deposit with a comparable deposit with the
same/similar lender for the remaining period of
the deposit.
- No early repayment is recognised.
- The fair value of receivables is taken to be the
invoiced or billed amount.
- Estimated ranges of interest rates at 31 March
2023 for loans payable based on new lending
rates for equivalent loans at that date. 
- The fair value of payables is taken to be the
invoiced or billed amount. 
Page 133 of 260

Page 134

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 75 
20.  Nature and Extent of Risks Arising from Financial Instruments 
The Council’s activities expose it to a variety of financial risks including:
• Credit risk – the possibility that other parties might fail to pay amounts due to the Council;
• Liquidity risk – the possibility that the Council might not have funds available to meet its commitments
to make payments;
• Market risk – the possibility that financial loss might arise for the Council as a result of the changes in
such measures as interest rates and stock market movements.
The Council has fully adopted CIPFA’s Code of Treasury Management in the Public Services Code of Practice
and set treasury management indicators to control key financial instrument risks in accordance with
CIPFA’s Prudential Code.
The Council’s management of treasury risks actively works to minimise the Council’s exposure to the
unpredictability of financial markets and to protect the financial resources available to fund services.
Credit Risk 
Credit risk arises from deposits with banks and financial institutions, as well as credit exposures to the
Council’s customers.  
The risk is minimised through the Council’s Treasury Management Strategy, which is set annually and is
monitored throughout the year.  The strategy sets out the limits on both duration and maximum levels of
deposits.  The lower an institution’s creditworthiness the lower the maximum duration and level of deposit
will be.  These Counterparties are chosen, by officers, using credit data supplied by the Council’s treasury
advisers (based on data from the three main credit rating agencies, overlaid by:
• Credit watches and credit outlooks from credit rating agencies;
• Credit Default Swap (CDS) spreads to give early warning of likely changes in credit ratings;
• Sovereign ratings to select counterparties from only the most creditworthy countries.
It is the policy of the Council to place deposits only with a limited number of banks and building societies
whose credit rating is independently assessed as sufficiently secure by the Council’s treasury advisers and
to restrict lending to a prudent maximum amount for each institution.  The Council also has a policy of
limiting deposits to £15 million per institution, other than for UK Nationalised and Part-Nationalised
institutions where the maximum is extended to £30 million.  No credit limits were exceeded during the
financial year.
The expected credit loss for the Council’s financial assets held at amortised cost has been calculated to be
£0.013 million (2021/22 £0.007 million).  The Council deems this immaterial and therefore has not included
any impact of this with the Comprehensive Income and Expenditure Statement (CIES).
The expected credit loss for the Council’s financial assets held at FVOCI is expected to be zero, calculated
on the following basis:
• Lothian Buses Shareholding – there has been no dividend paid to the Council since 2019 and this
situation is expected to continue until 2026;
• Subordinated Debt Investment in Newbattle DBFM Co SPV – Whilst there is no directly observable
indicators which would allow an expected credit loss for this investment to be accurately calculated,
there are no indications of adverse performance with the DBFM Co or any indications that future
scheduled lifecycle maintenance will not be able to take place or senior and/or subordinated debt will
not be able to be repaid.  The Council will continue to review the performance of the SPC on an annual
basis;
Page 134 of 260

Page 135

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 76 
• Midlothian Energy Ltd – Whilst there is no directly observable indicators which would allow an
expected credit loss for this investment to be accurately calculated, there are no indications of adverse
performance.  The Council will continue to review the performance of the company on an annual basis.
An age analysis of cash and cash equivalents and short-term deposits is shown in the table below:
2021/22  2022/23
£000 Financial Assets £000
109,976 Less than 3 months 87,228
14,994 3 to 6 months 0
28,242 6 months to 1 year 20,122
2,032 More than 1 year 0
155,244 Total Financial Assets 107,350 
Liquidity Risk 
The Council manages its liquidity position through the approval of treasury investment strategy reports
and through a comprehensive cash flow management system as required by CIPFA Code of Practice.  This
seeks to ensure that cash is available as needed.
If unexpected movements happen, the Council has ready access to borrowings from the money markets
and the Public Works Loan Board.  There is no significant risk that it will be unable to raise finance to meet
its commitments under financial instruments.  Instead the risk is that the Council will be bound to replenish
a significant proportion of its borrowings at a time of unfavourable interest rates.  The Council sets limits
on the proportion of its fixed rate borrowing during specified periods.  The strategy is that loan maturities
are spread across financial years to mitigate refinancing risk, through a combination of careful planning of
new loans taken out and (where it is economic to do so) making early repayments.  The maturity analysis
of financial liabilities is as follows: 
2021/22  2022/23
£000 Financial Liabilities £000
3,865 Less than 1 year 3,195
840 1 to 2 years 1,506
3,587 2 to 5 years 2,832
33,926 5 to 10 years 45,208
43,612 10 to 20 years 32,439
12,794 20 to 30 years 39,904
96,558 30 to 40 years 84,601
127,049 40 to 50 years 110,000
5,000 Greater than 50 years 5,000
327,231 Total Financial Liabilities 324,685 
Page 135 of 260

Page 136

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 77 
All trade and other payables are due to be paid in less than one year.
Market Risk 
Interest Rate Risk 
The Council is exposed to interest rate risk in terms of its exposure to interest rate movements on its
borrowings and investments.  Movements in interest rates have a complex impact on the Council.  For
instance, a rise in interest rates would have the following effects:
The current interest rate risk for the Council is summarised below:
• Borrowings at variable rates - the interest charged to the surplus or deficit on the provision of services
will rise;
• Borrowings at fixed rates – the fair value of the liabilities will fall;
• Deposits at variable rates - the interest income credited to the surplus or deficit on the provision of
services will rise;
• Deposits at fixed rates - the fair value of the assets will fall.
Borrowings are not carried at fair value, so normal gains and losses on fixed rate borrowings would not
impact on the surplus or deficit on the provision of services of other comprehensive income and
expenditure.  However, changes in interest payable and receivable on variable rate borrowings and
deposits will be posted to the surplus or deficit on the provision of services and affect the General Fund
balance.  
The Council has a number of strategies for managing interest rate risk. The Council’s policy is to aim to keep
a maximum of 30% of its borrowings in variable rate loans.  During periods of falling interest rates, and
where economic circumstances make it favourable, fixed rate loans will be repaid early to limit exposure
to losses.
The treasury management team has an active strategy for assessing interest rate exposure that feeds into
the setting of the annual budget and which is used to update the budget quarterly during the year.  This
allows any adverse changes to be accommodated.  The analysis will also advise whether new borrowing
taken out is fixed or variable.
According to this assessment strategy, at 31 March 2023, if interest rates had been 1% higher with all other
variables held constant, the financial effect would be:
2021/22  2022/23
£000  £000 
Impact on Taxpayer and Rent Payers: 
0 Increase on interest payable on variable rate borrowings 0
(1,223) Increase on interest receivable on variable rate instruments 1,599
(1,223) Impact on Surplus or Deficit on the Provision of Services 1,599 
Other presentational Changes: 
(60,293)
Decrease in fair value of fixed rate borrowing liabilities (no impact on
the Surplus or Deficit on the Provision of Services or Other
Comprehensive Income and Expenditure) (31,176) 
Page 136 of 260

Page 137

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 78 
The impact of a 1% fall in interest rates would be as above but with the movements being reversed.
Price Risk 
There is no price risk associated with the Council’s available for sale investments specified in Note 19 of
the Financial Statements.
Foreign Exchange Risk 
The Council has no financial assets or liabilities denominated in foreign currencies and thus has no exposure
to loss arising from movements in exchange rates.
21.  Assets Held for Sale 
2021/22  2022/23
£000 Assets Held For Sale £000
1,254 Balance outstanding at 1 April 1,480
617 Assets newly classified as held for sale 250
(138) Revaluations and Restatements 0
0 Additions 0
(253) Assets Sold (650)
1,480 Balance outstanding at 31 March 1,080 
22.  Inventories 
2021/22  2022/23
£000 Inventories £000
938 Balance outstanding at 1 April 983
807 Purchases 1123
(762) Recognised as an expense in the year (1,083)
983 Balance outstanding at 31 March 1,023 
23.  Debtors 
2021/22  2022/23
£000 Short-Term Debtors £000
7,276 Central Government Bodies 17,207
6,186 Other Public Sector Bodies 1,538 
Other Entities and Individuals (net of Impairment for bad debts)*: 
9,906   Council Tax and Non-Domestic Rates 9,082
2,334   Rents 3,613
10,979   Other trade debtors 9,371
36,681 Total Short-Term Debtors 40,811 
* For impairment, significant individual balances are considered before a collective impairment of all
remaining debtors based on their age profile. Impairment is applied to all outstanding debt at the balance
sheet date for Council Tax and Non-Domestic Rates of £41.213 million (2021/22 £39.259 million) and Rents
of £2.710 million (2021/22 £2.440 million). For sundry debtors all debts that are over six months past their
payment date impairment will be applied of £2.552 million (2021/22 £2.634 million), of which £1.752
million relates to housing benefit overpayments (2021/22 £1,735 million).
Page 137 of 260

Page 138

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 79 
24.  Cash and Cash Equivalents 
The balance of cash and cash equivalents is made up of the following elements:
2021/22  2022/23
£000 Cash and Cash Equivalents £000
329 Cash held by the Council 408
111,611 Short-term Deposits (1) 95,183
(1,965) Bank Current Accounts 63
109,975 Total Cash and Cash Equivalents 95,654
(1) In 2021/22 there was a misclassification of £50.214 million in short-term investments which should have
been reflected in Cash and Cash Equivalents.
25.  Creditors 
2021/22  2022/23
£000 Creditors £000
974 Central Government Bodies 447
13,113 Other Public Sector Bodies 10,124
39,409 Other Entities and Individuals 47,975
53,496 Creditors 58,546 
26.  Provisions 
Uninsured
Losses (1) 
Total 
£000 £000
Balance at 1 April 2022 1,231 1,231
New provisions made during the year 729 729
Increase/(decrease) to existing insurance provisions during the year (44) (44)
Amounts used during the year (677) (677)
Balance at 31 March 2023 1,239 1,239 
Notes:
(1) This relates to potential uninsured losses arising from insurance claims made against the Council.
27.  Grants Received in Advance 
The Council has received a number of grants and contributions that have yet to be recognised as income
as they have conditions attached to them that will require the monies to be returned to the grantor.  The
balances at year-end are as follows:
2021/22   2022/23
£000 Grants Received in Advance (Capital Grants)  £000
38,663 Balance at 1 April  43,432 
New capital grants received in advance, conditions of use not met:  
0 • Scottish Government Place Based Investment Programme 461 
653 • Scottish Government Town Centre Capital Fund 0 
10,135 • Section 75 contributions from private developers 7,940 
765 • Other Grants Received in Advance 0 8,401
11,553   51,833
(6,784) Amounts realised to CIES, conditions of use met  (7,102)
43,432 Balance at 31 March  44,731 
Page 138 of 260

Page 139

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 80 
28.  Usable Reserves 
Movements in the Council’s usable reserves are detailed in the Movement in Reserves Statement.
29.  Unusable Reserves 
2021/22  2022/23
£000 Unusable Reserves £000
(272,696) Revaluation Reserve (325,527)
(4,292) Financial Instruments Revaluation Reserve (5,408)
(447,420) Capital Adjustment Account (435,891)
1,660 Financial Instruments Adjustment Account 1,491
54,160 Pensions Reserve 7,800
8,560 Accumulated Absences Account 8,602
(660,028) Total Unusable Reserves (748,933) 
Revaluation Reserve 
The Revaluation Reserve contains the gains made by the Council arising from increases in the value of its
Property, Plant and Equipment and Intangible Assets.  The balance is reduced when assets with
accumulated gains are:
• Revalued downwards or impaired and the gains are lost;
• Used in the provision of services and the gains are consumed through depreciation; or
• Disposed of and the gains are realised.
The reserve contains only revaluation gains accumulated since 1st April 2007, the date the reserve was
created.  Accumulated gains arising before that date are consolidated into the balance on the Capital
Adjustment Account.
2021/22   2022/23
£000 Revaluation Reserve  £000
(224,283) Balance at 1 April  (272,696)
(67,038) (Surplus) or deficit on revaluation of non-current assets not posted to the
surplus or deficit on the provision of services 
(69,575)
13,237 Difference between fair value depreciation and historical cost depreciation  16,081 
Amounts written off to the Capital Adjustment Account  
0 Difference between fair value depreciation and historical cost depreciation 0 
5,388 Accumulated (gains)/losses on assets sold or scrapped  663 
5,388 Amount written off to the Capital Adjustment Account  663
(272,696) Balance at 31 March  (325,527) 
Financial Instruments Revaluation Reserve 
The Financial Instruments Revaluation Reserve contains the gains made by the Council arising from
increases in the value of its investments that at measured at fair value through other comprehensive
income.  The balance is reduced when investments with accumulated gains are:
• Revalued downwards and the gains are lost;
• Disposed of and the gains are realised.
Page 139 of 260

Page 140

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 81 
2021/22  2022/23
£000 Financial Instruments Revaluation Reserve £000
(5,149) Balance at 1 April (4,292)
857 (Upward)/Downward Revaluation of Investments (1,116)
(4,292) Balance at 31 March (5,408) 
Capital Adjustment Account 
The Capital Adjustment Account absorbs the timing differences arising from the different arrangements
for accounting for the consumption of non-current assets and for financing the acquisition, construction or
enhancement of those assets under statutory provisions.  The account is debited with the cost of
acquisition, construction or subsequent costs such as depreciation, impairment losses and amortisations
are charged to the Comprehensive Income and Expenditure Statement. The account is credited with the
amounts set aside by the Council as finance for the costs of acquisition, construction and subsequent
expenditure.
The account contains revaluation gains accumulated on property, plant and equipment before the 1st April
2007, the date that the Revaluation Reserve was created to hold such gains.
Note 7 provides further details of transactions posted to the account, apart from those involving the
revaluation reserve.
2021/22   2022/23
£000 Capital Adjustment Account  £000
(352,279) Balance at 1 April  (447,420) 
Reversal of items relating to capital expenditure debited or credited to the
Comprehensive Income and Expenditure Statement (CIES):  
24,556 • Charges for depreciation and impairment on non-current assets 25,558 
(61,390) • Revaluation movements on property, plant and equipment 22,603 
327 • Amortisation of intangible assets 171 
46 • Revenue expenditure funded from capital under statute 84 
5,993 • Amounts of non-current assets written off on disposal or sale as part of
the gain/loss on disposal to the CIES 1,158 
(30,468)   49,574
(5,388) Adjusting amounts written out of the Revaluation Reserve  (663)
(35,856) Net written out amount of the cost of non-current assets consumed in the year  48,911 
Capital financing applied in the year:  
(626) • Use of capital receipts to finance new capital expenditure (991) 
(22,221) • Capital grants and contributions credited to the CIES that have been
applied to capital financing (27,824) 
(8,957) • Statutory provision for the financing of capital investment charged
against the General Fund and HRA balances (7,178) 
(25,043) • Capital Expenditure Charged against the General Fund and HRA
Balances 0 
(1,979) • Use of Capital Fund Reserve to Finance Capital Expenditure (1,078) 
(58,826)   (37,071)
(459) Other movements  (311)
(447,420) Balance at 31 March  (435,891) 
Financial Instruments Adjustment Account 
The Financial Instruments Adjustment Account absorbs the timing differences arising from the different
arrangements for accounting for income and expenses relating to certain financial instruments and for
bearing losses or benefiting from gains per statutory provisions.
Page 140 of 260

Page 141

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 82 
2021/22  2022/23
£000 Financial Instruments Adjustment Account £000
1,829 Balance at 1 April 1,660
(159) Premiums incurred in the year  (159)
(10)
Amount by which finance costs charged to the CIES are different from
finance costs chargeable in year in accordance with statutory
requirements
(10)
1,660 Balance at 31 March 1,491 
Pensions Reserve 
The Pension Reserve absorbs the timing differences arising from the different arrangements for accounting
for post-employment benefits and for funding benefits in accordance with statutory provisions.  The
Council accounts for post-employment benefits in the Comprehensive Income and Expenditure Statement
(CIES)  as the benefits earned by employees accruing years of service, updating the liabilities recognised to
reflect inflation, changing assumptions and investment returns on any resources set aside to meet the
costs.  However, statutory arrangements require benefits earned to be financed as the Council makes
employers contributions to pension funds or eventually pays any pensions for which it is directly
responsible.   The pension reserve mirrors the net pension asset/liability, of which neither is being
recognised in 2022/23 as detailed in Note 35. 
2021/22  2022/23
£000 Pensions Reserve £000
141,030 Balance at 1 April 54,160
(111,171) Re-measurements of the net defined benefit liability/(asset) (255,237)
41,458 Reversal of items relating to net changes for retirement benefits
charged to Surplus or Deficit on the Provision of Services in the CIES
39,147
(17,157) Employers’ pension contributions  (18,733)
0 Restriction Adjustment under IFRIC 14 188,463
54,160 Balance at 31 March 7,800 
Accumulated Absences Account 
The Accumulated Absences Account absorbs the differences that would otherwise arise on the General
Fund Balance from accruing for compensated absences earned but not taken in the year, e.g. annual leave
entitlement carried forward at 31 March.  Statutory arrangements require that the impact on the General
Fund Balance is neutralised by transfers to or from the account.  
2021/22   2022/23
£000 Accumulated Absences Account  £000
8,986 Balance at 1 April  8,560
(8,986) Settlement or cancellation of accrual made at the end of the preceding year (8,560) 
8,560 Amounts accrued at the end of the current year 8,602 
(426) Amount by which officer remuneration charged to the CIES on an accruals
basis is different from remuneration chargeable in the year in accordance
with statutory requirements 
42
8,560 Balance at 31 March  8,602 
Page 141 of 260

Page 142

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 83 
30.  External Audit Costs 
The estimated fee payable by the Council to Audit Scotland in respect of the work carried out for external
audit services is £0.273 million (2021/22 £0.243) million).  Where further additional work is required, fees
will be agreed with management and reported to the Audit Committee.
31.  Related Parties 
The Council is required to disclose material transactions with related parties - bodies or individuals that
have the potential to control or influence the Council, or to be controlled or influenced by the Council. 
Disclosure of these transactions allows readers to assess the extent to which the Council might have been
constrained in its ability to operate independently or might have secured the ability to limit another party’s
ability to bargain freely with the Council. 
The Scottish Government
The Scottish Government has significant influence over the general operations of the Council – it is
responsible for providing the statutory framework within which the Council operates, provides much of its
funding in the form of grants, and prescribes the terms of many of the transactions that the Council has
with other parties (such as Council Tax bills and Housing Benefits).  Further information is contained with
Note 11 Taxation and Non-specific Grant Income and Note 12 Grant Income in the Annual Accounts.
Elected Members
Elected members of the Council have direct control over the Council’s financial and operating policies. The
total of members’ allowances paid in 2022/23 is shown in the Remuneration Report.
Members’ Register of Interests can be viewed on the Council’s website. A review of these interests has
been conducted. Related party interests for which transactions exist in 2022/23 were declared by nine
members:
• With voluntary bodies or charitable organisations that received funding totalling an estimated value of
£0.146 million;
• With businesses or other organisations that have contracted for goods and services with the Council
to the estimated value of £0.869 million. 
In addition to the above many members have relationships or hold positions with other public bodies and
voluntary organisations with which the Council does not have a financially material relationship but with
which the Council has a financial or influential relationship.
Officers
There are no related party transactions with officers of the Council.
Other Public Bodies
The Council has a number of joint working arrangements with other local authorities. In 2022/23 payments
of £1.988 million were made to other local authorities and income of £0.434 million was received from
other local authorities.
Midlothian Integration Joint Board
The Council works in partnership with NHS Lothian, providing a range of Health and Social Care services
across Midlothian. NHS Lothian transferred £4.903 million of resource transfer funding to the Council in
2022/23 in respect of activities delegated to the Midlothian Integration Joint Board, as well as an additional
£4.816 million in relation to Social Care Fund, £1.464 million from the Integrated Care Fund. The funding
supports various Adult Social Care services, both purchased and in-house.
Page 142 of 260

Page 143

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 84 
The Joint Director of Health and Social Care is employed by NHS Lothian. Midlothian Council is recharged
for 50% of the cost of this post. Details are included in the Remuneration Report.
The Council delegated resources totalling £56.612 million to the Midlothian Integration Joint Board in
2022/23. These resources were allocated to the Council for the provision of Adult Social Care services. NHS
Lothian also delegated financial resources to the Board. The Board provides the strategic direction in
relation to the delivery of Health and Adult Social Care Services in Midlothian. The Council provides
assistance in kind in terms of Board staff (Chief Officer) and administrative support for the operation of the
Board. In addition no charge is made for central support functions provided over and above the resources
delegated which relate specifically to Adult Social Care. As at 31 March 2023 the Council held £7.703 million
on behalf of the Board.
Other Entities Controlled or Significantly Influenced by the Council
During the year the Council entered into material transactions with the Lothian Valuation Board. This
amounted to £0.565 million (2021/22 £0.571 million). There was no balance due to or from the Lothian
Valuation Board as at 31 March 2023.
Midlothian Energy Limited was set up in 2021/22 as a 50:50 joint venture with Vattenfall Heat UK to
generate, distribute and supply energy. The company has been consolidated into the Group Accounts and
details of all other entities in which the Council has significant interest are explained in the Group Accounts
in Note 38.
32.  Capital Expenditure and Capital Financing 
The total amount of capital expenditure incurred in the year is shown in the table below (including the
value of assets acquired under finance leases and PPP contracts), together with the resources that have
been used to finance them.
2021/22  2022/23
£000 Capital Expenditure and Capital Financing £000
389,375 Opening Capital Financing Requirement 394,504 
Capital Investment: 
64,241 Property, Plant and Equipment 74,232
8 Assets Held for Sale 0
127 Intangible Assets 26
46 Revenue Expenditure funded by Capital Under Statute 85
0 Public, Private Partnership (PPP) 0  
0 Long-term Investments 0
64,422 Total Capital Investment 74,343 
Sources of Finance: 
(31) Capital Receipts (3)
(2,000) Capital Fund Applied (3,000)
(22,798) Government Grants and Other Contributions (24,824)
(25,048) CFCR 0
(9,416) Loans fund and PPP Finance lease repayments (9,558)
(59,293) Total Sources of Finance (37,385)
5,129 Increase/(decrease) in Capital Financing Requirement 36,958
394,504 Closing Capital Financing Requirement 431,462 
33.  Public Private Partnership (PPP) and Similar Contracts 
The Council has entered into five such contracts:
Dalkeith Schools Campus
Page 143 of 260

Page 144

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 85 
This is a 30-year PPP contract with Dalkeith SPV Ltd for the provision and facilities management of the
Campus.  When the agreement ends in 2034 the Campus facilities will transfer to the Council with a
guaranteed maintenance - free life of five years.  The contractor does not have any right of renewal on
contract expiry.  Termination of contract is either at contract end date or following the issue of a contractor
default notice of voluntary termination with one contract months’ notice.
Midlothian Schools Ltd
This is a PPP contract for the provision and facilities management of Stobhill, Gorebridge, Tynewater,
Moorfoot, Loanhead and St Margaret’s, Lawfield and Strathesk Primary Schools.  When the agreement
ends in 2037 the facilities will transfer to the Council in a usable condition as defined by the contract.  The
contractor does not have any right of renewal on contract expiry.  Termination of contract is either at
contract end date or following the issue of a contractor default notice of voluntary termination with six
months’ notice.
Newbattle Community Campus
This is a 25-year Not for Profit Distributing Model (NPDM) contract with hubCo for the provision and
lifecycle maintenance of the Campus.  The facility opened in the financial year 2018/19 on 25th May 2018. 
When the agreement ends in 2043 the facilities will transfer to the Council in a useable condition as defined
by the contract.  The contractor does not have any right of renewal on contract expiry.  Termination of
contract is either at contract end date or following the issue of a contractor default notice of voluntary
termination with variable notice periods as defined in the contract.
Food Waste Treatment Plant, Millerhill
This is a 20- year Design, Build, Finance and Maintain (DBFM) contract which was jointly procured between
Midlothian and the City of Edinburgh Council.  At the end of the concession period in 2036 the asset will
not revert back to the partner Councils and will remain under the full control of the DBFO operator, who
has the option to continue to operate the asset from year 20 through to year 40, paying the market rent
for the lease of the land over this period.  At the end of the 40th year, the asset will be decommissioned
and the decommissioned site transferred back to the ownership of the Councils.  Termination of contract
is either at contract end date or following the issue of a contractor default notice or voluntary termination
with 40 days’ notice.
Residual Waste Treatment Plant, Millerhill
This is a 25- year DBFM contract which was jointly procured between Midlothian and the City of Edinburgh
Council.  At 1 April 2020 the contract was in the commissioning phase, with full service commencement
achieved on 17 April 2019.  The asset will be fully maintained throughout the life of the contract in
accordance with the Partner Council’s requirements and will be inspected 18 months prior to the end of
the contract (contract end date 6 May 2044) to ensure that it has been maintained.  The asset will then be
handed back to the Partner Councils in a condition that is commensurate with such maintenance.  The
contractor does not have any right of renewal on contract expiry.  Termination of contract is either at
contract end date or following the issue of a contractor default notice, the issue of a Partner Council Default
notice, or voluntary termination by the Partner Councils with variable notice periods as defined in the
contract.
Property, Plant & Equipment 
The assets used to provide the services at the Dalkeith Schools Community Campus, the Primary Schools,
the Newbattle Community Campus and the Millerhill Residual Waste Plant are recognised in the Council’s
Balance Sheet under the Property, Plant and Equipment category in Note 14. 
Page 144 of 260

Page 145

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 86 
Payments 
The council makes an agreed payment each year that is increased annually by inflation and can be reduced
if the contractor fails to meet availability and performance standards in any year but which is otherwise
fixed.
There is also a donated asset account associated with the financing of the Millerhill Residual Waste asset.
The recognition of donated asset income is on a flat line basis over the 25 years of the contract.
Payments remaining to be made under these contracts at 31 March 2023 are as follows: 
Liability Interest Service
Charge
Total
Dalkeith Schools Campus £000 £000 £000 £000
Within 1 Year 1,107 1,820 2,331 5,258
Within 2 to 5 Years 5,605 6,102 9,924 21,631
Within 6 to 10 Years 10,657 3,977 13,866 28,500
Within 11 to 15 Years 1,422 138 1,590 3,150
Total Remaining Contract 18,791 12,037 27,711 58,539 
Liability Interest Service
Charge
Total
Midlothian Primary Schools £000 £000 £000 £000
Within 1 Year 1,069 1,899 2,318 5,286
Within 2 to 5 Years 5,116 6,758 9,868 21,742
Within 6 to 10 Years 8,795 6,047 13,788 28,630
Within 11 to 15 Years 11,060 2,337 14,007 27,404
Total Remaining Contract 26,040 17,041 39,981 83,062 
Liability Interest Service
Charge
Total
Newbattle Community Campus £000 £000 £000 £000
Within 1 Year 892 1,518 140 2,550
Within 2 to 5 Years 4,041 5,598 595 10,234
Within 6 to 10 Years 6,313 5,736 831 12,880
Within 11 to 15 Years 8,080 3,969 940 12,989
Within 16 to 20 Years 10,340 1,710 1,063 13,113
Within 21 to 25 Years 354 3 33 390
Total Remaining Contract 30,020 18,534 3,602 52,156 
Donated
Asset
Liability Interest Service
Charge
Total
Millerhill Residual Waste £000 £000 £000 £000 £000
Within 1 Year 573 53 936 1,248 2,810
Within 2 to 5 Years 2,293 210 3,636 5,630 11,769
Within 6 to 10 Years 2,867 416 4,297 7,869 15,449
Within 11 to 15 Years 2,868 1,076 3,655 8,770 16,369
Within 16 to 20 Years 2,866 2,352 2,195 9,996 17,409
Within 21 to 25 Years 1,146 861 128 2,358 4,493
Total Remaining Contract 12,613 4,968 14,847 35,871 68,299 
Although the payments made to the contractor are described as unitary payments, they have been
calculated to compensate the contractor for the fair value of the services they provide, the capital
Page 145 of 260

Page 146

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 87 
expenditure incurred and interest payable while the capital expenditure remains to be reimbursed.  The
liability outstanding to be paid to the contractors for capital expenditure incurred is as follows: 
2021/22    2022/23 
Liability Donated
Asset
Total  Liability Donated
Asset
Total
£000 £000 £000 Liabilities £000 £000 £000
85,443 13,760 99,203 Balance Outstanding at 1 April 82,729 13,187 95,916
(2,714) 0 (2,714) Payments during the year (2,910) 0 (2,910)
0 (573) (573) Other Movements 0 (574) (574)
82,729 13,187 95,916 Balance at 31 March 79,819 12,613 92,432 
2021/22  2022/23
£000 Included in the Balance Sheet £000
3,485 Current (Short-term Creditors) 3,693
92,431 Non-Current (Other Long-term Liability) 88,739
95,916 Balance at 31 March 92,432 
34.  Pension Schemes Accounted for as Defined Contribution Schemes 
Teachers employed by the Council are members of this Scottish Teachers Superannuation scheme,
administered by the Scottish Government.  The Scheme provides teachers with specified benefits upon
their retirement, and the Council contributes towards the costs by making contributions based on a
percentage of members’ pensionable salaries.
The scheme is technically a defined benefit scheme.  However, the scheme is unfunded and the Scottish
Government uses a notional fund as the basis for calculating the employers’ contribution rate by local
authorities.  The Council is not able to identify its share of underlying financial position and performance
of the scheme with sufficient reliability for accounting purposes. For the purposes of this Statement of
Accounts, it is therefore accounted for on the same basis as a defined contribution scheme.
In 2022/23 the Council paid £12.149 million (2021/22 £10.439 million) to the Scottish Government in
respect of teachers’ pension costs.  The rate of contribution was 23% for 2022/23 (2021/22 23%).
The Council is responsible for the costs of any additional benefits awarded upon early retirement outside
the terms of the teachers’ scheme.  These costs are accounted for on defined benefit basis (detailed in note
35).
The Council is not liable to the scheme for any other entities’ obligations under the plan.
35.  Defined Benefit Pension Schemes 
As part of the terms and conditions of employment and its officers, the Council makes contributions
towards the cost of post-employment benefits.  Although these benefits will not actually be payable until
employees retire, the Council has a commitment to make the payments (for those benefits) and to disclose
at the time that employees earn their future entitlement.
The Council participates in the Local Government Pension (Scotland) Scheme.  Employees other than
teachers are eligible to join this scheme.  The scheme is administered by City of Edinburgh Council through
Lothian Pension Fund.  This is a funded defined benefit final salary scheme, meaning the Council and
employees pay contributions into a fund, calculated at a level intended to balance the pension’s liabilities
with the investment assets.
The principal risks to the Council of the scheme are the longevity assumptions, statutory changes to the
scheme, and structural changes to the scheme (i.e. large-scale withdrawals from the scheme), changes to
Page 146 of 260

Page 147

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 88 
inflation, bond yields and the performance of equity investments held by the scheme.  These are mitigated
to a certain extent by the statutory requirements to charge the General Fund and Housing Revenue
Account the amounts required by statute as described in the accounting policies note.
Transactions Relating to Post-Employment Benefits 
The cost of retirement benefits in the reported cost of services is recognised when they are earned by
employees, rather than when the benefits are eventually paid as pensions.  However, the charge that is
required to be made against council tax is based on cash payable in the year, so the real cost of post-
employment/retirement benefits is reversed out of the General Fund and Housing Revenue Account via
the Movement in Reserves Statement.
The following transactions have been made in the Comprehensive Income and Expenditure Statement and
the General Fund balance via the Movement in Reserves Statement during the year.
2021/22  2022/23
£000 Comprehensive Income and Expenditure Statement (CIES) £000 
Cost of services: 
Service Cost Comprising: 
38,251 Current service cost 37,435
177 Past service cost (including curtailments) 0 
Financing and Investment Income and Expenditure: 
3,030 Net interest expense 1,712
41,458 Total Post-employment Benefit Charged to the Surplus or Deficit on
the Provision of Services
39,147 
Other Post Employment Benefit charged to the Other
Comprehensive Income & Expenditure Statement: 
Re-measurement of the Net Defined Benefit Liability Comprising: 
(53,864) Return on plan assets 3,555
(58,077) Actuarial (gains)/losses arising on changes in financial and     
demographic assumptions
(108,302)
770 Other  37,973
(111,171) Total post-employment benefits charged to the Other
Comprehensive Income & Expenditure Statement
(66,774)
(69,713) Total post-employment benefits charged to the CIES (27,627) 
2021/22
£000
Movement in Reserves Statement 2022/23
£000
(41,458) Reversal of net charges made to the surplus or deficit for the
provision of services for post-employment benefits in accordance
with the code
(39,147)
17,157 Employers Contributions payable to the scheme 18,733
(24,301) Total Charged to the Movement in Reserves (20,414) 
Pension Assets and Liabilities Recognised in the Balance Sheet 
Net Asset Restriction 
The actuary has calculated the Council’s IAS 19 defined benefit surplus for 2022/23 to be £188.463 million
as detailed in the tables below.  IAS 19 states that when an entity has a surplus in the defined benefit plan
it should measure the net defined benefit of the asset as the lower of:
• The surplus in the defined benefit plan, and
Page 147 of 260

Page 148

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 89 
• The asset ceiling, which the actuary has calculated as the present value of any economic benefits
available in the form of reductions in future contributions to the plan.  
For IFRIC 14 purposes, the actuary has calculated the net present value of the future contributions of
£154.671 million exceeds the value of the future service costs of £143.449 million, a negative contribution. 
As a result of this calculation IFRIC 14 advises that no defined benefit plan asset should be recognised in
the Council’s Balance Sheet and there is no requirement to recognise the £11.222 million difference as a
liability, however, is required to reflect the liability in relation to present value of unfunded obligations of
£7.8 million. 
The amount included in the Balance Sheet arising from the Council’s obligation in respect of its defined
benefit plans is as follows:
2021/22  2022/23
£000 Pensions Assets and Liabilities Recognised in the Balance Sheet £000
(731,499) Present value of the defined benefit obligation (510,236)
677,339 Fair value of Plan Assets 698,699
(54,160) Net (liability)/asset arising from defined benefit obligation 188,463
0 Restriction Adjustment under IFRIC 14 (196,263)
(54,160) Revised Net (liability)/asset arising from defined benefit obligation (7,800) 
2021/22  2022/23
£000 Reconciliation of the present value of the scheme liabilities (defined
benefit obligation
£000
747,208 Opening Balance at 1 April 731,499
38,251 Current service cost 37,435
15,196 Interest Cost 20,075
4,358 Contributions by Scheme Participants 4,788 
Re-measurement (gains)/losses 
(58,077) - Changes in financial and demographic assumptions (304,565)
770 - Other 37,973
177 Past service cost (including curtailments) 0
(716) Estimated Unfunded Benefits Paid (706)
(15,668) Estimated Benefits Paid (16,263)
731,499 Closing Balance at 31 March 510,236 
2021/22  2022/23
£000 Reconciliation of the movements in the fair value of scheme assets £000
606,178 Opening fair value of scheme assets 677,339
12,166 Interest Income 18,363 
Re-measurement gains/(losses): 
53,864 - Return on assets excluding amounts included in net interest (3,555)
0 - Other 0
16,441 Contributions from Employer 18,027
4,358 Contributions from employees into the scheme 4,788
(15,668) Benefits Paid (16,263)
716 Contributions in respect of Unfunded Benefits 706
(716) Unfunded Benefits Paid (706)
677,339 Closing Balance at 31 March 698,699 
Local Government legislation provides that Local Authorities have an obligation to meet their share of the
expenditure of the Joint Boards of which they are constituent members.  At 31 March 2023 the asset for
Pensions sits at £6.250 million (2021/22 £1.682 million).  As a consequence the Council has additional
assets arising from the pension surplus of the Lothian Valuation Joint Board.
Page 148 of 260

Page 149

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 90 
Basis for Estimating Assets and Liabilities 
Liabilities have been assessed on an actuarial basis using the projected unit credit method, an estimate of
the pensions that will be payable in future years are dependent on assumptions about mortality rates,
salary levels etc.  
The Local Government Pension Scheme liabilities have been estimated by Hymans Robertson LLP, an
independent firm of actuaries and estimates for the pension fund are based on the latest full valuation of
the scheme as at 31 March 2023.
The significant assumptions used by the actuary have been:
2021/22 Mortality Assumptions 2022/23 
Longevity at 65 for Current Pensioners: 
20.3 - Men (Years) 19.9
23.1 - Women (Years) 22.9 
Longevity at 65 for Future Pensioners: 
21.6 - Men (Years) 21.2
25.0 - Women (Years) 24.7 
Financial Assumptions 
3.20% Rate of Inflation/increase in pensions 2.95%
3.70% Rate of increase in salaries 3.45%
2.70% Rate for discounting scheme liabilities 4.75%
10.8% Actual Rate of Investment Returns 2.2% 
The estimation of the defined benefit obligations is sensitive to the actuarial assumptions set out in the
table above.  The sensitivity analysis below have been determined based on reasonably possible changes
of the assumptions occurring at the end of the reporting period and assumes for each change that the
assumption analysed changes while all the other assumptions remain constant.  The estimations in the
sensitivity analysis have followed the accounting policies for the scheme, i.e. on an actuarial basis using the
projected unit credit method.  The methods and types of assumptions used in preparing the sensitivity
analysis below did not change from the previous period.
Pension Sensitivities at 31 March 23 Approximate %
increase to the
Employer
Obligation
Approximate
monetary
amount £000
0.1% decrease Real Discount Rate 2% 9,763
1 year increase in member life expectancy 4% 20,409
0.1% increase in the Salary Increase Rate 0% 905
0.1 % increase in the Pension Increase Rate (CPI) 2% 9,003 
Page 149 of 260

Page 150

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 91 
Local Government Pension Schemes Comprised 
2021/22 2021/22   2022/23  2022/23
Fair Value
of Scheme
Assets
Percentage
of Total
Assets 
Quoted
prices in
active
markets
Quoted
prices
not  in
active
markets
Total 
Fair
Value of
Scheme
Assets
Percentage
of Total
Assets
£000  Pension Fund Assets £000 £000 £000 
76,112 11% Cash and Cash Equivalents 32,999 0 32,999 5%  
Equity Instruments:    
83,328 12%   Consumer 85,663 0 85,663 12%
89,643 13%   Manufacturing 96,314 0 96,314 14%
37,393 6%   Energy and Utilities 42,148 0 42,148 6%
39,038 6%   Financial Institutions 42,030 0 42,030 6%
46,919 7%   Health and Care 51,322 0 51,322 7%
30,778 5%   Information Technology 29,018 0 29,018 4%
50,498 7%   Other 47,709 0 47,709 7%
377,597 56% Sub-total Equity 394,204 0 394,204 56%  
Bonds:    
0 0   Corporate  10,897 0 10,897 2%
59,151 9% Government 81,001 0 81,001 12%
12,704 2%   Other 14,592 0 14,592 2%
71,855 11% Sub-total bonds 106,490 0 106,490 16%  
Property:    
35,807 5%   UK  4,682 26,792 31,474 5%
191 0%   Overseas 928 194 1,122 0%
35,998 5% Sub-total Property 5,610 26,986 32,596 5%  
Investment Trusts and Unit Trusts:    
12,167 2%   Equities 9,302 541 9,843 1%
31,718 5%   Bonds 0 20,230 20,230 3%
68,675 10%   Infrastructure 0 99,578 99,578 14%
112,560 17% Sub-total Trusts 9,302 120,349 129,651 18%
3,185 0% Private Equity (all) 437 2,292 2,729 0%
32 0% Derivatives: Forward Foreign
Exchange Contracts
30 0 30 0%
677,339 100% Total Assets 549,072 149,627 698,699 100% 
Impact on the Council’s Cash Flows 
The objectives of the scheme are to keep employers’ contributions at as constant a rate as possible.  The
fund has agreed a strategy with the scheme’s actuary to achieve a funding level of 100% of the overall
liabilities of the fund in the longer term.  Funding levels are monitored on an annual basis.  The next
triennial valuation will be performed during 2023/24 with results being published by 31 March 2024 and
will impact contribution rates from 1 April 2024.  The Council anticipates to pay £18.027 million in
contributions to the scheme to 31 March 2024.
The weighted average duration of the defined benefit obligation scheme members is 20 years for 2022/23
(20 years 2021/22).
36.  Contingent Liabilities 
The assimilation of the stand-alone Lothian Buses Pension Fund into the general Lothian Pension Fund
required all four Council shareholders in Lothian Buses Limited to enter into a deed of guarantee and act
as guarantors for Lothian Buses Limited contributions to the general fund. Previously, whilst there was no
formal guarantee in place for the stand alone Lothian Buses Fund, in the event of a default then the City of
Page 150 of 260

Page 151

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 92 
Edinburgh Council (as administering authority) would have looked to the four Council shareholders to make
good any liability.
37.  Trusts, Bequest, Common Good and Community Funds 
There are some 15 active trusts, bequest and community funds of varying size managed by the Council,
each of which has specific objectives and conditions.  None of the funds are currently registered charities.
The main funds are:
2021/22  2022/23
£000 Trusts, Bequests, Common Good and Community Funds £000
8 Dalkeith Common Good Fund 8
2 Penicuik Common Good Fund 2
51 Community Mining Funds 51
24 Other Funds 101
85 Total 162 
A further bequest was made during 2022/23 in relation to St David’s High School, Dalkeith for £0.075
million, which is the predominant reason for the increase in other funds of £0.077 million during the year.
A total £0.100 million (2021/22 £0.038 million) has been committed to be spent from these funds.
The funds do not represent assets of the Council and are included in the Balance Sheet as creditors except
the Community Mining Funds that are held in separate bank accounts.  
38.  Notes to the Group Accounts 
The Code of Practice on Local Council Accounting in the United Kingdom 2022/23 (The Code) applies to
Local Authorities or similar bodies defined in section 106 of the Local Government (Scotland) Act 1973 e.g.
statutory bodies such as Integration Joint Boards and Valuation Boards.  Authorities are required to prepare
a full set of group accounts in addition to their own Council’s accounts where they have a material interest
in such entities.  The Group Accounts of Midlothian Council are prepared in accordance with the accounting
policies of the Council with the additions and exceptions shown below.  The Group Accounts consolidate
the results of the Council with other entities.  These organisations are entirely independent of the Council
under law and for taxation.
Valuation of Property, Plant and Equipment 
The basis of valuation across the combining entities is in accordance with the Code and there are no
material inconsistencies with the policies adopted by Midlothian Council.  The Integration Joint Board has
no Property, Plant or Equipment.
Depreciation 
The basis of valuation across the combining entities is in accordance with the Code and there are no
material inconsistences with the policies adopted by Midlothian Council. 
Page 151 of 260

Page 152

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 93 
Goodwill 
The Council has acquired its share of the net assets of its associates for  nil consideration and no goodwill
has been included in the Group Balance Sheet.
Basis of Consolidation 
Subsidiaries are consolidated on a line-by-line basis.  All other entities are accounted for under the
accounting conventions of the “acquisition basis” using the equity method – the Council’s share of the
entities results and its share of other gains and losses (recognised in the Group CIES).  With the Exception
of Midlothian Energy Ltd, whose reporting date is 31 Dec, all entities have the same reporting date as the
Council.
Restrictions on the Transfer of Funds 
The Council’s share of the reserves of its associate and joint ventures is unusable i.e. it cannot be used to
fund the Council’s services to reduce taxation.  Further details for each entity are as follows: 
Percentage
Share in
Entity
Share
of
Assets
Share of
Liabilities
Net
Share of
Assets
Share of
Revenues
Share of
(Profit)/Loss
Entity % £000 £000 £000 £000 £000
Subsidiaries:      
Trusts, Bequests,
Common Good and
Community Funds
100 162 (162) 0 77 (77)
Pacific Shelf 826 Ltd 100 0 (53) (53) 0 4  
162 (215) (53) 77 (73)
Associates:      
Lothian Valuation Joint
Board
9 450 (324) 126 (977) 89       
Joint Ventures:      
Midlothian Integration
Joint Board
50 6,586 0 6,586 (91,586) 5,170
Midlothian Energy Ltd 50 7,005 (1,267) 5,738 (479) 479
Total Joint Ventures &
Associates 
14,041 (1,591) 12,450 (93,042) 5,738
Total for Group  14,203 (1,806) 12,397 (92,965) 5,665 
The information above agrees to the group accounts after the elimination of inter-company transactions.
Combining Entities 
The following table provided further details about the entities incorporated into the Council’s Group
Accounts:
Page 152 of 260

Page 153

Notes to the Accounts   
WWW.MIDLOTHIAN.GOV.UK 94 
Group Entities Nature of Body Accounts Available From
Subsidiaries:  
Trusts,
Bequests,
Common Good
and Community
Funds
To award grants across Midlothian. Midlothian Council,
Midlothian House,
Buccleuch Street, Dalkeith
Pacific Shelf 826
Ltd
Property Development. Midlothian Council,
Midlothian House,
Buccleuch Street, Dalkeith
Associates:  
Lothian Joint
Valuation Board
Maintains the electoral, council tax and non-domestic rates
registers for the Edinburgh, Midlothian, West Lothian and
East Lothian Councils.
The Treasurer, Lothian
Joint Valuation Board,
Edinburgh Council,
Waverly Court, Edinburgh
Joint Ventures:  
Midlothian
Integration Joint
Board
Its purpose is to improve the well-being of families, our
communities and of people who use health and social care
services.  The Integration Scheme determines when the
Council will have shared responsibility for additional
funding with NHS Lothian and is linked to demographic
shifts and demand volumes linked to service delivery.
Midlothian Council,
Midlothian House,
Buccleuch Street, Dalkeith
Midlothian
Energy Limited
Energy generation, distribution and supply Midlothian Council,
Midlothian House,
Buccleuch Street, Dalkeith 
Non-Material Interests in Other Entities 
In addition to the organisations outlined above, the Council also has an interest in Seemis Group LLP who
provide Scottish Local Authorities with an Education Management System.  Midlothian have a 1.90%
interest in Seemis. 
Page 153 of 260

Page 154

Council Tax Income Account   
WWW.MIDLOTHIAN.GOV.UK 95 
Housing Revenue Account 
The HRA Income and Expenditure Statement shows the economic cost in the year of providing housing
services in accordance with generally accepted accounting practices, rather than the amount to be funded
from rents and government grants.  The Council charge rents to cover expenditure in accordance with the
legislative framework; this may be different from the accounting cost.   The increase or decrease in the
year, on the basis which rents are raised, is shown in the movement on the Housing Revenue Account
Statement.
2021/22   2022/23
£000 HRA Income and Expenditure Statement  £000 
Expenditure  
6,155 Repairs and Maintenance 7,531 
5,575 Supervision and Management 4,948 
(52,138) Depreciation, impairment and revaluation non-current assets 30,157 
600 Movement in the allowance for bad debtors 270 
1,943 Other Expenditure 2,270 
(37,865) Total Expenditure  45,176 
Income:  
(29,643) Dwelling Rents (30,130) 
(332) Non-dwelling Rents (335) 
(292) Service Charge Income (364) 
(6) Other Income (34) 
(30,273) Total Income  (30,863)
(68,138) Net Expenditure or (Income) of HRA services as included in the
Comprehensive Income and Expenditure Statement 
14,313
250 HRA Share of Corporate and Democratic Core  311
(67,888) Net (Income)/expenditure for HRA Services  14,624 
HRA share of the operating income and expenditure included in
the whole authority Comprehensive Income and Expenditure
Statement:  
131 (Gain) or Loss on sale of HRA non-current assets 0 
6,481 Interest payable and similar charges 6,373 
(506) Interest and investment income (548) 
82 Net interest on the net defined liability benefit liability (asset) 10 
6,188   5,835
(61,700) (Surplus)/Deficit for the year on HRA Services  20,459 
Movement in depreciation, impairment and revaluation between years is due to the annual calculation of
the housing stock value which is measured on the basis of existing use value for social housing (EUV_SH).   
Page 154 of 260

Page 155

Council Tax Income Account   
WWW.MIDLOTHIAN.GOV.UK 96 
Movement in the Housing Revenue Account 
2021/22   2022/23
£000 Movement on the HRA Statement  £000
(48,385) Balance on the HRA at the end of the previous reporting period  (28,084)
(61,700) (Surplus) or deficit for the year on the HRA Income and Expenditure
Statement 
20,459 
Adjustments between accounting basis and funding basis under
statute:  
52,138 Depreciation, impairment and revaluation non-current assets (30,156) 
(131) Gain or (Loss) on sale of HRA non-current assets 0 
5,670 Loans Fund Principal 3,693 
25,000 Capital Expenditure Charged against the HRA Balance 0 
(676) Net charges made for retirement benefits in accordance with IAS 19 (124) 
82,001 Total Adjustments between accounting basis and funding basis
under statute 
(26,587)
0 Transfer to General Fund Reserve  2,069
20,301 (Increase) or Decrease in year on the HRA  (4,059)
(28,084) Balance on the HRA at the end of the current reporting period  (32,143) 
Notes to the Housing Revenue Account 
Housing Stock
The number of council dwellings for the year can be analysed as follows:
2021/22 Housing Stock 2022/23
1,001 1 Bedroom 1,024
4,009 2 Bedroom 4,062
1,920 3 Bedroom 1,948
322 4 Bedroom 323
10 5/6 Bedroom 11
7,262 Total Housing Stock at 31 March  7,368 
This represents an increase in the year of 106 units (2021/22 178), which is represented in the table below:
2021/22 Increase/(decrease) in Housing Stock 2022/23
176 New Build Completions 97
15 Market Purchases of Existing Purchases 28
(12) Re-purposed units for temporary accommodation (18)
(1) Demolition (1)
178 Total Housing Stock at 31 March  106 
Other Information
2021/22  2022/23
£000 Other Information £000
4,597 Total Rent Arrears 5,490
2,440 Bad Debt Provision 2,710
904 Void Rent Loss (netted against rental income) 896 
Page 155 of 260

Page 156

Council Tax Income Account   
WWW.MIDLOTHIAN.GOV.UK 97 
Council Tax Income Account 
The Council Tax Income Account (Scotland) shows the gross income raised from Council Taxes levied and
deductions made under statute.  The resultant net income is transferred to the Comprehensive Income
and Expenditure Statement of the Council.
Local Authorities raise taxes from its residents through Council Tax, which is based on property values. 
Each dwelling in a local Council area is placed into one of eight valuation bands, A to H.  The Council declares
a tax for Band D properties and all other properties are charged a proportion of this, lower valued
properties (Bands A to C) pay less; higher valued properties (Bands D to F) pay more.
2021/22  2022/23
£000 Council Tax Income Account £000
64,045 Gross Council Tax levied and Contributions in Lieu 67,229 
Less: 
(5,053)   Council Tax Reduction Scheme (5,265)
(6,402)   Other Discounts and Reductions (6,746)
(2,008)   Write-off of Uncollectable Debts and Allowances for impairment (2,106)
(227)   Prior year adjustments 204
50,355 Net Council Tax Income transferred to General Fund 53,316 
Midlothian Council Tax Charge and Properties by Band
2021/22  2021/22  2022/23  2022/23
Property
Numbers
£ per
Property
Band Property
Numbers
£ per
Property
1 783 A - Disabled 1 801
581 939 A 541 962
8,418 1,096 B 8,016 1,122
8,584 1,252 C 8,376 1,282
5,011 1,409 D 5,044 1,443
4,767 1,851 E 4,892 1,895
3,992 2,290 F 4,218 2,344
2,526 2,759 G 2,706 2,825
171 3,452 H 174 3,534
34,051   33,968 
Page 156 of 260

Page 157

Council Tax Income Account   
WWW.MIDLOTHIAN.GOV.UK 98 
Calculation of Council Tax Base (shown as numbers of properties)
2022/23 A
(Disabled)
A B C D E F G H Total No
of
Properties
Number of Properties 0 987 12,672 11,203 5,875 5,520 4,466 2,834 182 43,739
Properties subject to Empty Homes Premium 0 9 66 34 20 20 14 16 2 181
Properties subject to Disabled Relief 2 36 33 (41) 8 (4) (5) (27) (2) 0
Less:            
Exempt Properties 0 80 475 254 103 189 49 20 3 1,173  
Properties Entitled to 25% Discounts 0 153 1,547 1,018 452 306 156 75 5 3,712  
Properties Entitled to 50% Discounts 0 0 5 5 2 3 1 1 0 17  
Properties Entitled to Other Discounts 0 2 28 18 10 6 4 2 0 70  
Reduction in Tax Base due to Council Tax Reduction 1 256 2,700 1,525 292 140 47 19 0 4,980
Total Equivalent Properties 2022/23 1 541 8,016 8,376 5,044 4,892 4,218 2,706 174 33,968
Ratio to Band D 0.56 0.67 0.78 0.89 1.00 1.31 1.63 1.96 2.45 
Band D Equivalent Properties 0 361 6,234 7,446 5,044 6,428 6,855 5,299 427 38,094
Contributions in Lieu - Band D Equivalents          198
Sub-total          38,292
Less Bad Debt Provision at 3.5%          (1,460)
Total Council Tax Base          36,832 
2021/22 A
(Disabled)
A B C D E F G H Total No
of
Properties
Band D Equivalent Properties 1 387 6,547 7,630 5,011 6,263 6,487 4,947 420 37,693
Contributions in Lieu - Band D Equivalents          196
Sub-total          37,889
Less Bad Debt Provision at 3.5%          (1,425)
Total Council Tax Base          36,464 
Page 157 of 260

Page 158

Non-Domestic Rate Account   
WWW.MIDLOTHIAN.GOV.UK 99 
Non-Domestic Rate Account 
The Non-domestic Rate Account (Scotland) is a statement that reflects the statutory obligation for billing
authorities to maintain a separate non-domestic rate account.  The statement shows the gross income
from the rates and deductions made under statute.  The net income is paid to the Scottish Government as
a contribution to the national non-domestic rate pool.
2021/22  2022/23
£000 Non-Domestic Rate Income Account £000
43,735 Gross Council Tax levied and Contributions in Lieu 44,743 
Less: 
(16,382)   Reliefs and other deductions (10,682)
(617)   Write-off of Uncollectable Debts and Allowances for impairment (784)
26,736 Net Non-Domestic Rates Income 33,277
(2,582) Prior year adjustments (4,671)
(104) Non-domestic rates income retained by the council (BRIS) 0
24,050 Contribution to Non-Domestic Rate Pool 28,606 
Allocated: 
24,127 Contribution to non-domestic rate pool 28,688
(77) Council Rate Income - non-pool (82)
24,050  28,606
18,811 Amount distributed to Midlothian Council from non-domestic rate
pool
24,895 
The Business Rate Incentivisation Scheme (BRIS) permits the Council to retain 50 percent share of the Non-
domestic rates income, which exceeds the income target set by Scottish Government.
Net Rateable Value Calculation
Occupiers of non-domestic property pay rate based on the valuation of the property within the valuation
roll for Midlothian.  The NNDR poundage is determined by the Scottish Government and was 49.8p
(2021/22 49.0p) per £, where the rateable value was less than £51,000 (2021/22 £51,000), 51.1p where
the rateable value is between £51,000 and £95,000 and 52.4p (2021/22 50.3p between £51,000 and
£95,000, 51.6p greater than £95,000) per £ where the rateable value exceeded £95,000 (2021/22 £95,000).
Small Business Bonus Scheme – from 1 April 2017, a ratepayer who occupies or is entitled to occupy one
of more non-domestic properties with a combined rateable value of £18,000 or less may be eligible for a
discount between 25% and 100% on their bill.  In addition, where the cumulative rateable value of a
business falls between 18,000 and 35,000, the scheme will offer 25% relief to individual properties with
rateable value of up to £18,000.
2021/22 2021/22  2022/23 2022/23
Numbers £000 Analysis of Rateable Values and Number of Premises Numbers £000
1,837 49,125 Shops, Offices and Other Commercial Subjects 1,828 49,279
944 17,114 Industrial and Freight Transport 954 19,777
302 20,482 Miscellaneous (Schools etc.) 303 22,931
3,083 86,721 Total 3,085 91,987 
Page 158 of 260

Page 159

Glossary of Terms   
WWW.MIDLOTHIAN.GOV.UK 100 
Glossary of Terms 
While much of the terminology used in this report is intended to be self-explanatory, the following
additional definitions and interpretation of terms may be of assistance.
Actuarial Gains and Losses (Pension)
For a defined benefit scheme, the changes in actuarial deficits or surpluses that arise because events have
not coincided with the actuarial assumptions made for the last valuation (experience gains and losses) or
the actuarial assumptions have changed.
Amortisation
Amortisation is the cost of reducing the value of an intangible asset over its useful economic life. A charge
is made against services for the value of the assets they have used during the year.
Assets
An asset is any item that has value including cash, investments, properties, vehicles, etc. Assets are
classified as current, which will be consumed within the current year, or non-current, which will be used to
provide services over more than one year.
Associate
An entity other than a subsidiary or joint venture in which the reporting Council has a participating interest
and over whose operating and financial policies, the reporting Council is able to exercise significant
influence.
Capital Expenditure
This is expenditure incurred in creating, acquiring or improving assets where the expenditure is normally
financed by borrowing with repayment over a period of years, or by utilising the income from the sale of
existing assets.
Capital Financed from Current Revenue
This heading covers the costs of creating, acquiring or improving assets where the expenditure is charged
directly to the Revenue Account.
Corporate and Democratic Core
Corporate and Democratic Core costs include the costs of policymaking and all other Councillor based
activities together with costs that relate to the general running of the Council. The Best Value Accounting
Code of Practice stipulates that such costs are to be excluded from the “total cost” relating to service
activity.
Community Assets
Long-term assets that have no determinable useful economic life and are held in perpetuity by the Council,
including parks and open spaces.
Creditors
Creditors are a kind of liability. They represent payments owed by the Council to another person or
organisation for past events. 
Page 159 of 260

Page 160

Glossary of Terms   
WWW.MIDLOTHIAN.GOV.UK 101 
Debtors
Debtors are a kind of asset.  They represent payments owed to the Council by another person or
organisation for past events.
Defined Benefit Pension Scheme
A Defined Benefit Pension Scheme is a scheme where the benefits due to participants are predetermined
based on earnings, length of service and age and are not directly dependant on the contributions paid or
investment returns realised.
Depreciation
Depreciation is the measure of the cost of wearing out, consuming or reducing the useful life of the
Council’s assets. A charge is made against services for the value of the assets they have used during the
year.
Entity
A body corporate, partnership, trust, unincorporated association, or statutory body that is delivering a
service, or carrying on a trade or business, with or without a view to profit. It should have a separate legal
personality and is legally required to prepare its own single-entity accounts.
Fair Value
The fair value of an asset or liability is the price at which it could be exchanged or settled in an arm’s length
transaction between two willing, knowledgeable parties.
Financial Instrument
A financial instrument is any contract, which gives rise to a financial asset or liability or an equity instrument
in another entity, this includes cash, debtors, creditors, loans, borrowings and shares in other companies.
Infrastructure Assets
Non-current assets that cannot be transferred or sold, including roads, bridges and footpaths.
Inventories
Inventories are raw materials or goods which have been purchased but which have not yet been consumed
in the delivery of Council services.
Liabilities
A liability represents a payment owed to another person or organisation including loans, outstanding
invoices, provisions, contributions owed to third parties, etc. Short-term liabilities are due to be paid within
the current year. Long-term liabilities are amounts that will not be paid until a later year.
Non-Distributable Costs
Non Distributable Costs represent costs that cannot be allocated to specific services and again, under the
Best Value Accounting Code of Practice, are excluded from the total cost relating to service activity. 
Examples of Non Distributable Costs are charges for added pension years and early retirement.
Other Costs
This heading covers items of expenditure that cannot be accommodated in any of the other categories.
Provisions
A provision is a kind of liability. Where a payment for a liability is certain or very likely to occur but the
exact amount and timing is not known, an amount must be put aside to meet the estimated future costs. 
Page 160 of 260

Page 161

Glossary of Terms   
WWW.MIDLOTHIAN.GOV.UK 102 
Revaluation / Impairment
Revaluations and impairments are adjustments to the value of an asset, either positively or negatively, to
align the carrying value of an asset to an independent assessment of the asset’s fair value.
Revenue Expenditure
Revenue expenditure includes the day-to-day costs of providing services including salaries and wages,
property costs, transport costs and supplies and services. It also includes the costs of the repayment of
loans used to finance capital expenditure. 
Page 161 of 260

Page 162

Page 162 of 260

Page 163

Audit Committee
Monday 30 October 2023
Item No 5.3 
Risk Management Update – Strategic Risk Profile Quarter 1 2023/24 
Report by Derek Oliver, Chief Officer Place 
Report for Information 
1 Recommendations 
Audit Committee is recommended to:
• Note the current risk landscape and organisational response to
the most significant risks in Quarter 1 (Q1) 2023/24 (1 April to 30
June 2023). 
2 Purpose of Report/Executive Summary 
The purpose of this report is to provide Audit Committee with:
• An update on the risk responses Midlothian Council has
implemented during Q1 2023/24 to respond to the current risk
climate
• Assurance that Midlothian Council took a proportionate and
planned approach to prepare and respond to the current risk
climate
• The risk evaluation of current strategic risks and opportunities
for the Council 
14 September 2023 
Report Contact:
Derek Oliver, Chief Officer Place
Derek.Oliver@midlothian.gov.uk 
Page 163 of 260

Page 164

2 
3 Q1 risk management overview 
3.1 Midlothian Council has delivered a wide range of services to the people
of Midlothian throughout Quarter 1 2023/24. 
3.2 The Council continues to manage and review risks recorded within the
Strategic Risk Profile. The work required to maintain the necessary
corporate oversight over the broader strategic landscape continues
through the Risk and Resilience Chief Officer’s group and Corporate
Management Team (CMT). 
3.3 Audit Committee should note that there were no new risks added from
the previous Quarter. Updates on actions taken are included in the full
strategic risk profile (Appendix B). 
Strategic Risk Profile Summary
3.4 The SRP is split into three sections:
• Strategic issues
• Strategic risks
• Opportunities 
STRATEGIC ISSUES - SUMMARY 
Strategic issues Likelihood Impact Score Evaluation Q1 Q4 22/23
COVID 19 1 4 4 Low  Low
The Change Programme 5 5 25 Critical  Critical
Financial Stability 5 5 25 Critical  Critical
National Care Service 3 5 15 Medium  Medium 
COVID-19
3.5 The risk evaluation was reduced from Critical to High in Q1 22/23 and
remained as high through 2022/23. With the recovery of the pandemic,
the likelihood was re-evaluated and considered low in Q4 22/23.  The
Council continues to monitor and risk assess as appropriate.
The Change Programme 
3.6 The Change Programme remained at Critical throughout 22/23 and into
Q1 23/24. The financial challenges of the underlying budget gap pose
a significant challenge for benefits realisation. Council agreed to a
Transformation Blueprint in June 2023 which is a 5-year transformation
plan. 
Financial Sustainability 
3.7 The scale of the financial challenge continues to be reported to
Business Transformation Steering Group and Council. 
National Care Service
3.8 The first stage of the Bill has been delayed and it is anticipated that an
update shall be available around December 2023. 
Page 164 of 260

Page 165

3
STRATEGIC RISKS – SUMMARY 
Strategic Risks Likelihood Impact Score Evaluation Q1 Q4 22/23
Climate change 5 5 25 Critical  Critical
Financial Sustainability in
future years
5 5 25 Critical  Critical
The Long Term Change
Programme
5 5 25 Critical  Critical
Early Years Expansion
(1140 Hours)
4 5 20 High . High
Scottish Child Abuse
Inquiry
4 4 16 High  High
UK decision to leave the
EU
4 5 20 High  High
Growing Council 4 4 16 High  High
Cost of Living Crisis 3 5 15 Medium  Medium
Asset Management 3 5 15 Medium  Medium
Cyber Security 3 5 15 Medium  Medium
Health and Safety 3 5 15 Medium  Medium
Care at Home 3 4 12 Medium  Medium
Governance and standards 2 4 8 Low  Medium
Employee performance 3 4 12 Medium  Medium
Emergency planning and
business continuity
3 4 12 Medium  Medium
Legal and Regulatory
compliance
3 3 9 Medium  Medium
Internal control
environment
2 3 9 Low  Medium
Corporate policies and
strategies
2 3 6 Low  Low 
STRATEGIC RISKS – RATED CRITICAL/HIGH 
Climate Change 
3.13 The Council developed a Climate Change Action Plan as part of its
Climate Change Strategy approved by Council in August 2020, as well
as making the commitment to achieve Carbon Neutral by 2030.  
3.14 A review of the current Climate Change Strategy and Action Plan is
being undertaken and an update will be provided to Council in Q2
2023/24. The risk evaluation continues to remain Critical in Q3. 
Early Years Expansion (1140 hours)
3.17 Following the Scottish Government’s decision to increase the number
of free early learning and childcare hours to 1140, the Council has
continued to plan with its partners. The two key strands to the
successful implementation are the recruitment and training of staff and
the physical increase in estate capacity. These challenges are being
considered in the wider context of the plan, in which the capacity and
Page 165 of 260

Page 166

4
expansion of all funded providers (council, private and voluntary
settings as well as childminders) combine to deliver the requirements. 
3.18 This risk evaluation continues to remain High whilst the Council awaits
an update on the funding provision. 
Scottish Child Abuse Inquiry (SCAI)
3.19 The SCAI risk remains High. 
UK decision to leave the EU
3.20 The rate of inflation is impacting on the cost of living crisis for
Midlothian residents and posing significant risk to a number of Council
Capital Programme work streams. This was reported to the Business
Transformation Steering Group (BTSG) and also through progress
reports on programmes to Council.  This risk evaluation remains High. 
Growing Council
3.21 In Q2 22/23 the risk evaluation increased from Medium to High and
remains High in Q1 2023/24. This is in response to the current financial
challenge as described above and the increased pressure the Council
faces with growth. Some current examples of this include:
• Inflationary impact on the delivery of the capital programme
• Cost of living crisis and rent freeze response that could risk the
delivery of the house building programme
• Pressure on the care sector as people are living longer and
require more care provision
• General population growth places additional demand on
infrastructure such as GPs, schools, waste services etc.
3.25 Work is ongoing to review the Learning Estate Strategy and a
reprioritisation of the Capital Programme.  
STRATEGIC OPPORTUNITIES 
Shawfair
3.26 The Shawfair development, with its new Rail link provides a major
incentive for house builders, employers, retail and commercial interests
including opportunities to secure a low carbon community through
district heating from Zero Waste. The Energy Services Agreement with
Shawfair LLP has now been signed and work progresses to deliver the
Energy Centre. 
Easter Bush
3.27 Fast growing opportunities in Science, Technology, Engineering and
Mathematics (STEM) with opportunities to link with education.
Partnership links to schools and university sector at the 'Bush' to
promote STEM. The rate of inflation is impacting on the costs of the
A701 improvements which will was reported to Council at the end of
June 2022. A funding application was submitted to the UK
Government’s Levelling Up fund to close the funding gap. 
Page 166 of 260

Page 167

5 
City Deal
3.28 Edinburgh and South East Scotland City Region Deal - bid for funding
to Scottish and UK Governments to accelerate economic growth
through investment in infrastructure/ housing/ skills and innovation was
agreed by Council in June 2018.  Projects continue to be progressed
with realisation of regional enhancements and connectivity. 
Creating a world class education system
3.29 The Centres of Excellence model is a core part of the Council's
strategy to create a world-class education system in Midlothian. 
Page 167 of 260

Page 168

6
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
There are no direct resource implications indicated in this report,
although, individual risks have associated resource implications. 
4.2 Digital 
None 
4.3 Risk 
The risks reported in this report are understood with the Council able to
demonstrate the current risk controls and actions being taken in
response to these.
The report provides an overview of the significant risks faced by the
Council during Quarter 1 2023/24 and should act to provide assurance
that Midlothian Council took a proportionate and planned approach to
prepare and respond to each of these risks. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
There are no direct equalities issues arising from this report. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Strategic Risk Profile (Quarter 1 2023/24) 
Page 168 of 260

Page 169

7
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
This report provides an overview of the Strategic Risk Profile of
Midlothian Council at a defined point in time. The issues, risks and
opportunities affecting or supporting delivery of the council priorities are
set out within the Strategic Risk Profile. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The Council’s commitment to best value and securing continuous
improvement can best be delivered when decisions are made against a
backdrop of understanding the risks and opportunities before an
organisation. This report seeks to provide assurance that the current
risk environment is understood and that Midlothian Council is taking
appropriate action in response to those identified risks. 
A.5 Involving Communities and Other Stakeholders 
This Strategic Risk Profile report has been compiled with input from a
range of internal key stakeholders. 
Page 169 of 260

Page 170

8
A.6 Impact on Performance and Outcomes 
This report seeks to provide an overview of the challenging risk
environment within which the Council is operating at this time. Being in
a risk aware position helps to inform current and future decision
making, with the intention of enhancing decision making and the
associated performance and outcomes which flow from well informed
decision making. 
A.7 Adopting a Preventative Approach 
The Risk Management approach being taken by the Council is founded
on a preventative approach to managing risks, where appropriate and
more generally to decision making with far greater risk awareness. 
A.8 Supporting Sustainable Development 
Senior Managers must ensure the sustainability of the Council, which
entails identifying, understanding and managing Strategic and Service
level risks and opportunities.
Page 170 of 260

Page 171

1
Strategic Risk Profile 
Strategic issues 
SRP.IR.02 The Change Programme 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.IR.02
Risk cause
The pace of transformation strands of activity, reporting to
the Business Transformation Board, does not secure
service transformation, delivery of outcomes or benefit
realisation. 
Risk event
Delayed progress or non-achievement of outcomes and
benefits. 
Risk effect 
Slow or delayed financial benefits arising from service
redesign, requiring the adoption of recovery plans or
requiring short term service reductions which impact on the
Council’s ability to deliver against its priorities.  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions. 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships
Transformation Blueprint agreed at Council June 2023 which is a 5-
year transformation plan. Revised governance for transformation
agreed and PMO to be established to oversee change programme. 
2. Regular reporting to Council setting out scale of financial challenge
ahead with recurring expenditure for current service delivery projected
to exceed recurring income. 
3. Cross Party Business Transformation Steering Group engaged in
consideration of measures to secure balanced budgets alongside the
development of a Strategic Plan to support decisions about what
services, beyond those which are statutory can be provided. 
4. Financial monitoring reports and work of the Financial Management
Corporate Management Team evidence continued financial
sustainability, in so far as services are delivered within the overall
budget in year.  
5 5 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SPR.RA-
02.08 Transformation Blueprint 2023-28 approval
Q1 23/24: Transformation Blueprint presented to Council in June 2023 and agreed.
Transformation Manager appointed – expected start date Q2 2023/24. Review of BTB
governance complete and closure report produced for BTSG Q2 2023/24. 
Q4 22/23:  The Strategic Plan, Transformation Blueprint and updated MTFS projections
will all be presented to Council in June 2023. They come together to provide a framework
to effect change and to move the Council to a position of financial sustainability.
Chief Finance
Officer / Chief
Officer Corporate
Solutions (Acting)
/ Chief Officer
Place 
27 Feb 2024 
27-June-2023 
Page 171 of 260

Page 172

2 
Q3 22/23: Development of Strategic Plan and MTFS for next term of Council being
progressed to support decisions about what services, beyond those which are statutory
can be provided. This facilitates setting of the 2023/24 budget in February 2023.
SRP.RA.02.0
3
Develop Medium Term Financial Strategy with greater
oversight, clearer responsibility and accountability.
Q1 23/24: The projected budget gap through to 2028/29 was presented to BTSG and
contained in the Transformation Blueprint approved by Council. Updated projections will
be presented to BTSG and to Council on a regular basis. 
Q4 22/23:  An assessment of the projected budget gap through to 2028/29 was presented
to BTSG, is contained in the Transformation Blueprint and will be updated regularly to
BTSG and to Council. 
Q3 22/23: An ongoing assessment of the projected gap for 2023/24 proposals through to
2027/28 has been presented to BTSG alongside a series of officer savings proposals to
bring recurring expenditure back in line with recurring income. 
Chief Finance
Officer
27 Feb 2024 
27-June-2023 
SRP.IR.07 Financial Sustainability 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.IR.07
Risk cause
Scottish Government Grant settlements fall short of the
resources needed to sustain core services. Core funding
falling short of inflation pressures, pay awards and
demographic pressures arising from an Increasing ageing
population of over 75’s 
Increasing population of 0-15 age group and at a time
when there are rising customer expectations. 
Risk event
Transformation activity and the flexibility available to
Councils as part of the grant settlement does not address
future years projected budget gaps. 
Risk effect 
Inadequate government funding makes securing balanced
budgets challenging. It turn erodes the Council’s ability to
deliver services to the community and potentially means
that resources available fall short of those the Council
assess as required to meet its statutory obligations. Whilst
transformation activity can help reshape services and
ensure best value in the delivery of services it is not a
solution to continued erosion of core funding.  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions. 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships
1. There is an approved Capital Strategy and Reserves Strategy in
place. The Capital Strategy is being updated in the context of ongoing
and significant infrastructure pressures.  
2. There is an approved budget for 2022/23. Services were delivered
within the totality of that budget and the 2023/24 budget has been
approved albeit with some reliance on one off funding. 
3. There are effective arrangements in place to monitor financial
performance including quarterly reporting to Council with draft reports
considered at a dedicated CMT session each quarter to bring greater
focus. 
4. Directorates have budget boards in place to monitor and agree
actions for those items which are identified as needing specific
attention or present a risk to the financial position of services. 
5. Strategic Boards in place and BTB focus and attention on driving
transformation to support future year’s financial sustainability. 
6. Working through COSLA to influence government spending
decisions to influence Scottish Government’s budget allocation to
Councils. 
7. Capital Plan and Asset Management Board will scrutinise and
challenge slippage on capital programmes recognising that slippage
can have an adverse impact on financial sustainability and also the
delivery on assets required to support capital growth. 
8. Chief Executive continues to emphasise the need for effective
5 5 
Page 172 of 260

Page 173

3
financial control and underlined the benefit to the organisation of such
an approach. Enhanced monitoring arrangements have been put in
place across the Council. 
9. Scottish Governments May 2022 Resource Spending Review
provided planning parameters for term of parliament, albeit these are
challenging and present a real terms reduction in grant funding of circa
7% over the period. 
10. Report to Council 21 February 2023 sets out scale of financial
challenge ahead with recurring expenditure for current service delivery
projected to exceed recurring income. 
11. “Mini Budgets” progressed in 2020/21 and in 2021/22 that removed
non-deliverable legacy savings targets given focus on response to and
recovery from pandemic. 
12. Cross Party Business Transformation Steering Group engaged in
consideration of measures to secure balanced budgets alongside the
development of a Strategic Plan to support decisions about what
services, beyond those which are statutory can be provided.                
Related
Action Code Related Action Related action latest note Managed By Due Date Status
NEW Capital Plan Prioritisation
Q1 23/24: The Capital Plan in its current format is unaffordable due to rising costs of
construction, inflation and EU-Exit/post pandemic and other economic pressures. A review
of the Capital Plan is underway to determine affordability, prioritisation and options
presented to members for consideration in Q2 2023/24.
Executive Director
Place Oct-2023 
SPR.RA-
02.09 Transformation Blueprint 2023 to 2028
Q1 23/24: Transformation Blueprint presented to Council in June 2023 and agreed.
Transformation Manager appointed – expected start date Q2 2023/24. Review of BTB
governance complete and closure report produced for BTSG Q2 2023/24. 
Q4 22/23:   The Strategic Plan, Transformation Blueprint and updated MTFS projections
will all be presented to Council in June 2023. They come together to provide a framework
to effect change and to move the Council to a position of financial sustainability. 
Q3 22/23: The Strategic Plan, Transformation Blueprint and updated MTFS projections will
all be presented to Council in June 2023. They come together to provide a framework to
effect change and to move the Council to a position of financial sustainability.
Chief Finance
Officer Complete 
SRP.RA.02.0
3
Develop Medium Term Financial Strategy with greater
oversight, clearer responsibility and accountability.
Q4 22/23:   An assessment of the projected budget gap through to 2028/29 was presented
to BTSG, is contained in the Transformation Blueprint and will be updated regularly to
BTSG and to Council. 
Q3 22/23: An ongoing assessment of the projected gap for 2023/24 proposals through to
2027/28 has been presented to BTSG alongside a series of officer savings proposals to
bring recurring expenditure back in line with recurring income
Chief Finance
Officer Complete 
SRP.IR.10 COVID 19 
Page 173 of 260

Page 174

4
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.IR.10
Risk cause: COVID 19 Virus 
Risk event: Virus evident in all communities with rates of
positive infection increasing. In a Sottish setting the focus
on increase is within the central belt. 
Risk effect: Potential for widespread impacts with the risk
of significant levels of community transmission leading to
increased government restrictions aimed at reducing
community transmission. 
Delivery of services making use of remote working
solutions as far as possible. National lockdown measures
to limit and control spread, impact on income generating
services. 
Rapid pace of guidance change following government
announcements and expectation of quick changes to
service delivery in line with new controls.  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions. 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships,
HR Strategic
Lead
1. CIMT established to take the strategic approach to managing the
response to COVID 19 and stands ready to be re-initiated at any time. 
2. Hybrid working has been adopted by the Council as well as a
dedicated Hybrid Working Board as part of the Transformation
Programme 
3. COVID-19 guidance monitored and continually revised, with
particular focus on Adult Services, Children’s Services, Education and
Communities and Lifelong Learning around how they would continue to
maintain contact with children and young people who were deemed to
be at risk. 
4. Keeping employees briefed and supported through the Chief
Executive’s weekly staff briefings; Communications weekly email and
routine HR updates. (e-mailed to all employees through combination of
work and personal e-mail addresses). Includes Wellbeing advice,
guidance and support and signposting to PAM and EAP providers. 
5. Promotion of digital tools to support employees and prevent
employees becoming isolated. 
6. Council website kept up-to date, providing details of which services
were operating and any changes on how to access services. 
7. A range of interventions, including digital equipment and tools such
as MS Teams put in place to support remote and hybrid working 
8. Following safe working guidance issued by Scottish Government
relevant to sectors. 
9. Economic Recovery Strategy 
10. School and workplace based COVID risk assessments continually
reviewed to support the identification and control of risk (and personal
risk assessments where required)  
1 4 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.10.1 Hybrid Working
Q1 23/24: Hybrid Working Programme closed. Closure report presented to Place DMT
and contained within BTB closure report. Workstreams relating to Estate Rationalisation
have moved into Blueprint and continue under the themes of Hub & Spoke, Capital Plan
and One Stop Shops. Project Team and Terms of Reference being established. 
Q4 22/23: Project continuing.
Q3 22/23: Hybrid Working project is a key project contributing to the Council’s
transformation programme. Project Board regularly reports to Business Transformation
Board and Business Transformation Steering Group. 
Executive Director
Place, Chief
Digital Officer,
Chief Officer
Place, Chief
Officer Corporate
Solutions 
31 Mar 2024 
SRP.IR.11 National Care Service
Page 174 of 260

Page 175

5 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.IR.11
Risk cause
In August 2022 the Scottish Government launched a 12-
week consultation on the way in which social care is
delivered in Scotland. The consultation followed
recommendations made in the Independent Review of
Adult Social care. The independent analysis of responses
was published in February 2022. On 20 June 2022 the
Scottish Parliament published the National Care Service
(NCS) Bill which will provide the foundation for the NCS. 
Risk event
A Bill passes through various Parliamentary stages. The
Bill is currently in Stage 1 of the process. The most
significant part of the legislation which poses the most risk
is the intention to transfer social care responsibility from
local authorities to a new, national service. 
Risk effect 
The details of the logistics of any transfer are not yet
provided within the Bill. It is not clear the extent to which
powers will be removed from local authorities or what the
provision or delivery of services will or will not be. 
At this stage, the risk effect is anticipated to be significant
financial impact to local authorities and IJBs, as well as the
potential for impacts on staffing, transfer of property and
facilities and the reshaping of the delivery of care. 
It should be noted that the initial impact on the Council is
staff time to contribute to the ongoing discussions and
understanding of the impact of the Bill.  
Chief Executive,
Executive
Director Health &
Social Care,
Head of Adult and
Social Care;
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place;
Chief Officer
Children, Young
People and
Partnerships
1. The first stage of the Bill has been delayed and it is anticipated that
an update shall be available around December 2023. 
2. Officer Working Group established to engage with the NCS Design
School and to continue the existing work with COSLA, SOLACE,
SOLAR and other relevant bodies 
3. Ongoing briefings with elected members 
4. Continued dialogue and engagement with Scottish Government and
IJB/H&SCP/Children’s Services  
3 5 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.11.1 Officer Working Group 
Q1 23/24: Work on the NCS has been delayed and further information will not be available
until around December 2023 
COSLA and Social Work Scotland have formally requested a pause on the NCS Bill. 
Officer Working Group agreed to be established by CMT  
Chief Executive
Working
Group
established
and meets as
and when
required 
Page 175 of 260

Page 176

6
Strategic Risks   
SRP.RR.01 Financial Sustainability in future years 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.01
Risk cause:
Scottish Government Grant settlements fall short of the
resources needed to sustain core services. Core funding
falling short of inflation pressures, pay awards and
demographic pressures arising from an Increasing ageing
population of over 75’s. 
Increasing population of 0-15 age group and at a time
when there are rising customer expectations. 
Policy decisions by UK & Scottish Governments which are
not fully funded. 
Changes to the responsibilities of Local Government and
the funding implication that arise from that, particularly in
respect of the creation of a National Care Service. 
Future year pay award settlements. 
Risk event: 
Real terms reduction in core grant settlements. 
Policies decisions at Government level not fully funded to
Council's. 
Implementation of a National Care Service and impact on
grant settlements 
Securing the extent of change required in order to deliver
financial sustainability and a change program that
recognises the size of the challenge. 
Cost pressures exceeding budget estimates. 
Uncertainty around service delivery models and income
streams and prospects for public finances associated with
COVID impact and recovery. 
Risk effect: 
Gap in Council budget between budget commitments /
pressures and funding level and inadequate options
presented to address this, resulting in a structural deficit.
The pace of growth coupled with the shortfall in grant
settlements adds pressure to Council budgets which will be
unable to deliver capital and revenue work programmes.  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions. 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships
1.  The Strategic Plan, Transformation Blueprint and updated MTFS
projections will all be presented to Council in June 2023.
2. Maintaining a level of reserves to deal with unforeseen or one-off
cost pressures. 
3. Capital and Reserves Strategies in place. The Capital Strategy is
being updated in the context of ongoing and significant infrastructure
pressures.
4. Working through COSLA to influence government spending
decisions to influence Scottish Government’s budget allocation to
Councils. 
5. Implement a lobbying strategy with government to recognise the
unique position Midlothian Council is in. 
6. Best Value Audit report actions. 
7. Strategic Boards in place to drive transformation in line with the
Transformation Blueprint. 
8. Dedicating capacity to understand impact of NCS Bill, but limited
details mean this is challenging and many unanswered questions (refer
to specific risk on NCS for further detail)  
5 5 
Page 176 of 260

Page 177

7              
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.02.0
3
Develop Medium Term Financial Strategy with greater
oversight, clearer responsibility and accountability.
Q1 23/24: The projected budget gap through to 2028/29 was presented to BTSG and
contained in the Transformation Blueprint approved by Council. Updated projections will
be presented to BTSG and to Council on a regular basis. 
Q4 22/23:   An assessment of the projected budget gap through to 2028/29 was presented
to BTSG, is contained in the Transformation Blueprint and will be updated regularly to
BTSG and to Council (see SRP.RA.02.04) . 
Q3 22/23: An ongoing assessment of the projected gap for 2023/24 proposals through to
2027/28 has been presented to BTSG alongside a series of officer savings proposals to
bring recurring expenditure back in line with recurring income
Chief Finance
Officer
27 Feb 2024 
SRP.RA.02.0
4 Transformation Blueprint  2023 to 2028
Q1 23/24: Transformation Blueprint presented to Council in June 2023 and agreed.
Transformation Manager appointed – expected start date Q2 2023/24. Review of BTB
governance complete and closure report produced for BTSG Q2 2023/24. 
Q4 22/23:   The Strategic Plan, Transformation Blueprint and updated MTFS projections
will all be presented to Council in June 2023. They come together to provide a framework
to effect change and to move the Council to a position of financial sustainability. 
Q3 22/23: The Strategic Plan, Transformation Blueprint and updated MTFS projections will
all be presented to Council in June 2023. They come together to provide a framework to
effect change and to move the Council to a position of financial sustainability.
Chief Executive,
Chief Finance
Officer
27 Feb 2024 
SRP.RA.02.0
5 Understanding impact of NCS Bill   Chief Executive Paused 
NEW Capital Plan prioritisation
Q1 23/24: The Capital Plan in its current format is unaffordable due to rising costs of
construction, inflation and EU-Exit/post pandemic and other economic pressures. A review
of the Capital Plan is underway to determine affordability, prioritisation and options
presented to members for consideration in Q2 2023/24. 
Q4 22/23: Work progressing on Capital Plan prioritisation.
Q3 22/23: Work is ongoing to review the overall Capital Plan and committed expenditure,
with a reprioritisation of the programme reflective of the escalating inflationary pressures.
Reprioritisation plan to be presented to Council in Q4 for approval, aligned to the Medium-
Term Financial Strategy.
Executive Director
Place, Executive
Director Children,
Young People and
Partnerships,
Chief Finance
Officer, Head of
Development
October 2023 
SRP.RR.02 The Long-Term Change Programme 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.02 Risk cause
A MTFS that doesn't address the projected budget shortfall
Chief Executive,
Executive
1. Development of Strategic Plan, Transformation Blueprint and MTFS
projections which come together to provide a framework to effect 5 5 
Page 177 of 260

Page 178

8
or contextual factors relating to the Midlothian area. 
Reduced resources 
Leadership fit for the future. 
Lack of clarity or clear compelling vision for the future 
Delay or shortfall in securing savings 
Lack of or not securing transformational change in service
provision 
Risk event
Delayed progress in applying various strands of the
Change Programme including Delivering Excellence
Framework 
Slow benefits realisation and budget savings 
Cuts in service provision rather than service transformation 
Risk effect
Objectives of change not actually met. 
Adverse impact on services 
Slow or delayed proposals/savings arising from service
redesign. Potentially further eroding reserves or requiring
short term service reductions which impact on Council's
ability to deliver against its priorities. Staff morale
negatively affected, Government step-in short term savings
instead of transformation  
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships
change and to move the Council to a position of financial sustainability.
2. Leadership from all Elected Members, Executive Team and Senior
Leadership Group. 
3. Appropriate governance in place across the BTB Strategic Boards 
4. Resilience planning. 
5. Capacity to deliver change. 
6. Dedicating capacity to understand impact of NCS Bill, but limited
details mean this is challenging and many unanswered questions (refer
to new risk on NCS for further detail)   
Related
Action Code Related Action Related action latest note Managed By Due Date 
SPR.IA.02.06 Transformation Blueprint  2023 - 2028
Q1 23/24: Transformation Blueprint presented to Council in June 2023 and agreed.
Transformation Manager appointed – expected start date Q2 2023/24. Review of BTB
governance complete and closure report produced for BTSG Q2 2023/24. 
Q4 22/23:    The Strategic Plan, Transformation Blueprint and updated MTFS projections
will all be presented to Council in June 2023. They come together to provide a framework
to effect change and to move the Council to a position of financial sustainability. 
Q3 22/23: Q3 22/23: The Strategic Plan, Transformation Blueprint and updated MTFS
projections will all be presented to Council in June 2023. They come together to provide a
framework to effect change and to move the Council to a position of financial
sustainability.
Chief Finance
Officer, Chief
Officer Place,
Chief Officer
Corporate
Solutions
27-June-2023 
SRP.RA.02.0
3
Develop Medium Term Financial Strategy with greater
oversight, clearer responsibility and accountability.
Q1 23/24: The projected budget gap through to 2028/29 was presented to BTSG and
contained in the Transformation Blueprint approved by Council. Updated projections will
be presented to BTSG and to Council on a regular basis. 
Q4 22/23:   An assessment of the projected budget gap through to 2028/29 was presented
Chief Finance
Officer 27-June-2023 
Page 178 of 260

Page 179

9
to BTSG, is contained in the Transformation Blueprint and will be updated regularly to
BTSG and to Council. 
Q3 22/23: Q3 22/23: An ongoing assessment of the projected gap for 2023/24 proposals
through to 2027/28 has been presented to BTSG alongside a series of officer savings
proposals to bring recurring expenditure back in line with recurring income 
SRP.RR.03 Legal and Regulatory Compliance 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.03
Risk cause
Current or new legislation applying to Midlothian Council 
Risk event
Council and or Services not identifying all applicable
legislation impacting Council activities and Service
requirements. 
Risk effect Council failing to meet its statutory obligations
resulting in a potential negative impact for service users or
employees. Reputational impact of not meeting statutory
obligations.  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships,
Legal and
Governance
Manager
1. Executive Directors, Chief Officer(s) and Head(s) of Service
responsible for identifying applicable legislation and propose Council or
Service responses to CMT and Cabinet/Council as required. 
2. Annual Assurance Statement. 
3. Internal Audit testing of internal controls as part of risk-based audit
plan. 
4. External Audit. 
5. Range of external inspection. 
6. Local Scrutiny Plan 
7. BTSG oversight of new legislation
8. Central repository of applicable legislation.
3 3 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.03.0 Rights of the Child Bill  Executive Director 31-Dec-23 
Page 179 of 260

Page 180

10
2 Q4 22/23: No further progress from previous quarter.
Q3 22/23: Scotland is set to become the first country in the UK to directly incorporate the
UN Convention on the Rights of the Child into domestic law. The Scottish Government’s
new bill on the rights of the child is expected to have far reaching implications for public
bodies. Midlothian Council is beginning to roll out training with regards to the implication
this new piece of legislation shall have on all services. 
Q2 22/23: Scotland is set to become the first country in the UK to directly incorporate the
UN Convention on the Rights of the Child into domestic law. The Scottish Government’s
new bill on the rights of the child is expected to have far reaching implications for public
bodies. With guidance beginning to be disseminated from the Scottish Government, the
Council is continuing to monitor and plan.   
Children, Young
People and
Partnerships,
Chief Social Work
Officer
SRP.RA.03.0
3 National Care Service
Q1 23/24: The first stage of the Bill has been delayed until December 2023 
Q1 22/23:
Officer Working Group agreed to be established by CMT. Note details on the NCS Bill are
currently limited – see new risk within Strategic Risk profile for further information and
actions.  
Chief Executive 31-Dec-2023 
SRP.RA.03.0
5 Standing Orders
Q1 23/24  - no update – as per last quarter work is ongoing 
Q4 22/23: The Standing Orders Working Group (SOWG) met in April 2023. The interim
hybrid working protocol was reviewed and referred to Council. It was agreed in May 2023
by Council. SOWG will monitor the implementation of the interim protocol and will review
in Q3/Q4 2023/24. The SOWG will meet in Q3 to review the revised changes to Standing
Orders following its first meeting. It is anticipated that revised Standing Orders will be
presented to Council late Q3/early Q4 for approval and implementation
Q3 22/23: The Standing Orders Working Group was approved and appointed at the
Council meeting on 13.12.2022 and will meet in Q3 to ensure that these issues are
included within this work programme and that all staffing changes are incorporated into
the Scheme of Delegation. In the interim, mitigations will be put in place to ensure
authorisations are valid.  
Q2 22/23: Structural reviews within the Midlothian Council resulting in the Standing Orders
being outdated. Authorised Officers within Regulatory Services may be open to challenge
in relation to statutory enforcement work on grounds of delegated authority. Statutory
enforcement work including the service of Statutory Notices, Fixed Penalties and Court
proceedings may require to be withdrawn resulting in reputational damage and or financial
penalty (e.g., case costs awarded against the LA). Structural reviews approved by Council
have been incorporated into Standing Orders. 
Executive Director
Place; Chief
Officer Corporate
Solutions, Legal
and Governance
Manager
31- Mar 2024 
SRP.RR.04 Employee performance 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
Page 180 of 260

Page 181

11
SRP.RR.04
Risk cause
Employees not suitably trained/developed for the roles
required of them. 
limited availability of qualified practitioners in certain
sectors 
Change program not informed by all key stakeholders 
Ageing work force 
Employees unclear on expected behaviours. 
Employees constrained to innovate as a result of
management practice 
Employee productivity rate below the required level
because of ineffective use of the People Policies
particularly Maximising Attendance 
Salaries significantly lower in social work area in
comparison to other LA’s resulting in recruitment issues
particularly with trying to recruit experienced staff 
Risk event
Employees not engaged/consulted as part of organisational
transformation. 
Experienced employees leaving the organisation 
Inability to recruit suitably qualified / trained staff to fill
vacancies negatively impacting on remaining workforce 
Unacceptable behaviours demonstrated by employees 
Stated organisational culture not consistently reinforced by
managers 
Poor employee performance will stifle transformational
change 
Risk effect
Difficulties recruiting the right staff 
Challenges retaining quality staff 
Low skill levels 
Low morale, especially during change 
High absence rates, loss of experience in service areas. 
‘A Great Place to Grow’ our values including respect
,collaboration, pride and ownership not realised, potentially
resulting in missing the opportunity to capitalise on the
abilities, experience and ideas of team members. Poor
employee performance will Exacerbate the financial
challenge  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships,
HR Strategic
Lead
Over-riding risk control measure = Focus on having the right people,
here, healthy, performing, behaving and well led via effective utilisation
of the workforce strategy and accompanying action plan. 
Attendance / Wellbeing
1. Continuing implementation of the Wellness@Midlothian agenda. 
2. Creation of an Employee Health and Wellbeing Strategy and
supporting policy. 
3. Maintaining the Healthy Working Lives Gold Award. 
4. Proactive use of Occupational Health, Midlothian Physiotherapy,
Employee Assistance Programme and the Workplace Chaplaincy
Service. 
5. Change of EAP supplier to ensure provision of best possible service. 
6. Development of progressive People Policies. 
7. Roll-out of mental health training for staff and managers. 
Performance
1. Service-level workforce plans. 
2. Structured, robust, well established ‘Making Performance Matter’
Framework where expected standards of behaviour and Council values
are re-enforced. 
3. Continued re-enforcement of all People Policies involving various
communication methods. 
4. Development of a suite of management information to ensure
Service Managers are informed e.g., turnover, absence levels/reasons
etc. 
Organisational Change
1. Policy for Organisational Change includes strong emphasis on early
engagement of employees. 
2. Redeployment Procedure to ensure maximum chance of successful
redeployment. 
Conduct
1. Resolution Policy encourages early intervention of workplace issues. 
2. Professional standards and values build into the induction process
and management development programme. 
Communication
1. A range of initiatives to keep staff informed of change (Chief
Executive’s weekly email, Connect, All staff emails, tailored team
briefings etc.  
3 4 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.02.0
4  LORNA
Revisions to Service Workforce Plans - including analysis
of future workforce requirements, gap analysis and gap
Q1 23/24: Service plans were presented to June 2023 council. Supporting workforce plans
are due to be fully in place for June 2024. The workforce planning process, guidance and HR Strategic Lead 31 Mar 2024  
Page 181 of 260

Page 182

12
GILBERT closing strategies, and performance measures and target
setting.
documentation has been developed and approved for use by managers across the
council. The HR team is available to support managers who wish help and guidance in the
development of these workforce plans.
Q3 22/23: Workforce plan guidance issued to all Directorates. Refreshed workforce plans
to be developed in line with the new service plans for the next financial year 23/24.
Q4 22/23: Service Plans 2023-27 being presented to June Council for agreement.  
Workforce plans will then be developed aligned to agreed revised service plans agreed in
June 2023; supporting workforce plans in place by June 2024. 
SRP.RA.02.0
6 Workforce wellbeing
Q1 23/24: Health and Wellbeing is part of the work ongoing under Theme 2 of the
Blueprint. This work will report further as part of that reporting process, in the latter half of
2023.
Q3 22/23: Continuing to embed the new Employee Health and Wellbeing Strategy.  
HR Strategic Lead
31 Mar 2024   
SRP.RR.07 Care at Home 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.07
Risk cause
Internal and External providers of Care at Home services
unable to meet service and quality requirements as a result
of a lack of capacity. 
Risk event
Capacity of Community Support outstripped by demand 
Risk effect There is a risk that patients will have their
discharge delayed because there is insufficient community
supports to enable timely discharge leading to deterioration
in their health, beds being blocked and elective operations
potentially being cancelled.  
Director Health
and Social Care,
Head of Adult
Health and Social
Care
1. Care at Home winter assurance plan and business continuity plan
complete 
2. Development of Care at Home Service Improvement action plan
near completion 
3. External commissioning complete and ongoing contract monitoring
in place 
4. External provider audits complete 
5. Re-established Multi-Agency Quality in Care at Home quarterly
review meetings jointly with East Lothian 
6. Weekly provider meetings in place 
7. Additional locum team members and contracts with agency staff in
place 
8. Daily discharge meeting with Multidisciplinary and Multi-agency
team planning to plan and coordinate discharge to ensure care at hone
support in place  
3 4 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.07.0
1 Independent review of adult and social care Q1 23/24: Pause remains in place.  Head of Adult and
Social Care; Chief
Executive
31-Jan-2024 
Page 182 of 260

Page 183

13
SRP.RR.08 Asset Management – buildings, vehicles,  roads and Digital assets/networks 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.08
Risk cause
Many of the assets the Council own by their nature are in a
position of ongoing deterioration through their normal use,
e.g., roads - normal wear and tear, street lights and
vehicles & buildings used to deliver services. 
Risk event
Many assets will deteriorate under normal conditions
although buildings, roads and street lights as an example
can be damaged during more extreme weather events or
as a result of a lack of maintenance. 
Risk effect
In the case of Roads Services there is a real risk of
increased potholes and insurance claims, reduced skid
resistance leading to higher accident potential and building
up of higher costs in the future. In respect of vehicles,
increased breakdowns, service failures, greater
maintenance inevitable, higher short-term hire costs. In
terms of property, health and safety issues arise, failure to
meet current standards and higher running costs. There is
also the risk of two-tier accommodation, some high quality,
some low. 
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships,
Head of
Development
1. There is provision in place within the capital plan for investment in
the asset base. 
2. Asset register 
3. Condition Survey 
4. Understanding of future asset needs 
5. Asset Strategy: 
. Roads 
. Land 
. Fleet 
. Digital Service Network 
. Digital Service hardware 
6. Capital program - investment in estate. 
7. Ongoing monitoring of properties by: Maintenance Surveyors,
Facilities Management and Property Users. 
8. Established Capital Plan and Asset Management Board and
dedicated Asset Management Board 
9. Establishment of 7 thematic Estate Safety and Management Groups
chaired by Chief Officer Place  
10 Building Accessibility Strategy 
3 5 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.08.0
2
Plan for appropriate investment in capital works and
remedial maintenance over the lifespan of each property
asset.
Q1 23/24: Surveyors Thompson Gary have been appointed and are progressing a
schedule of condition surveys over a 2-3 year period. This is currently in hand with surveys
progressing.
Q2 22/23: Programme of work agreed to progress for building condition surveys on a
phased approach, over a three year period. Move to implementation into 22/23.   
Chief Officer Place 
31-Mar-2024 
SRP.RA.08.0
5 Learning Estate Strategy
Q1 23/24: 
All Priority 1 projects as detailed in the Learning Estate Strategy have been approved by
Council in June 2023, this includes Beeslack HS replacement and Penicuik HS
refurbishment & extension. A number of Projects in the priority 2 tranche have been
progressed to ensure schools to do not experience capacity breaches.Q4 22/23 Due to a
number of factors a number of key Learning Estate project remain at risk. Rising costs,
labour shortage and availability of materials. Some of the LES priority projects are not
funded in the existing Capital Plan.
Executive Director
Children, Young
People and
Partnerships,
Head of
Development 
31-Mar-2024 
Page 183 of 260

Page 184

14
Q2 22/23: Potential risk to delivery of Learning Estate projects due to .inflated costs from a
number of factors. Factoring the commitment to net zero into our projects has added
another cost pressure and may affect the affordability and viability of some projects.
Oversight of Learning Estate programme through the Capital plan & Asset Management
Board   
SRP.RA.08.0
6 Asset Management systems Q1 23/24: Included within the Transformation Blueprint sprints  Chief Officer Place 31-Mar-2024 
SRP.RR.09 Emergency Planning and Business Continuity Management 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.09
Risk cause
The Council not preparing or timeously reviewing
Emergency Plans and testing arrangements to respond to
Civil Contingencies Incidents 
Risk event
There are a wide range of potential events the Council may
be expected to respond to e.g., Severe weather incident,
Pandemic, Utility disruption etc. 
Risk effect
Censure through non-compliance with the Civil
Contingencies Act 
Not adequately recovering from the loss of major
accommodation (e.g., secondary school, main offices),
computer systems and staff 
Not able to respond to a major emergency in the
community Fatal Accident Inquiries  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships,
Head of
Development,
Senior Manager
Protective
Services, Health,
Safety &
Resilience
Manager
Potential sub risks include:- 
01 – Civil Contingencies Risk Register used to highlight key risks and
record response, 
- Council’s plans developed and maintained in response to identified
risks, 
- Risk and Resilience Group support development, peer review and roll
out of plans. 
02 – Establishment based incident response plans in place and
maintained locally. 
03 – Emergency response plan setting out general approach to
respond to a major emergency in-line with key partner organisations. 
04 – As part of the Council’s Emergency response the importance of
recording decisions made and information available at the time is
highlighted as this would be scrutinised in the event of an FAI. 
05 – Care for People Group meeting 6 weekly to continue support for
Communities in response to COVID – 19 to establish and co-ordinate
support for people on a multi-agency basis. 
06 – Care for People Group: Afghan, Ukrainian and UASC support
programmes  
3 4 
Related Related Action Related action latest note Managed By Due Date Status
Page 184 of 260

Page 185

15
Action Code
SRP.RA.09.0
2 Development of Emergency Planning Improvement Plan
Q1 23/24 A has been prepared for CMT on Enhancing Organisational Resilience and
Preparedness. This report also addresses progress with business continuity. 
A service  review of the Health, Safety & Resilience team is scheduled to commence in
Q2 2023/24 
Q4 22/23: Following recent participation in a number or emergency exercises a draft
report has been prepared for CMT on Enhancing Organisational Resilience and
Preparedness. This report also addresses progress with business continuity.
Q3 22/23: New Health, Safety and Resilience Team Manager in post
Q2 22/23: New Contingency Planning Officer in post and work progressing on
improvement plan   
Chief Officer
Place; Senior
Manager
Protective
Services, Health,
Safety &
Resilience
Manager 
30 Sept 2023 
SRP.RA.09.0
3 Business Continuity System
Q1 23/24 as above in terms of staffing resource
Consideration of the appropriateness of procuring the system upgrade version will occur in
Q2 
Q4 22/23: Refer to point above.
Q3 22/23: Pilot areas identified and champions across Directorates for the roll out
Q2 22/23: System currently being populated ahead of roll out to all services. A small
number of Council services engaged to test and validate operational functionality. Project
governance now overseen through the Customer Service Platform Board   
Chief Officer
Place; Senior
Manager
Protective
Services, Health,
Safety &
Resilience
Manager
30 September
2023       
SRP.RR.10 Governance and Standards in Public Life 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.10
Risk cause
Code of conduct for Members and employees’ actions
falling short of International Standards. 
Risk event
Failure in openness, accountability, clarity. 
Risk effect
Service, partnerships and project outcomes not achieved
Non-compliance with conduct standards and reduction in
standards in public life  
Chief Officer
Corporate
Solutions; Chief
Executive; Chief
Officer Place;
Executive
Director Place;
Alan Turpie
Potential sub risks include:- 
01 Macro governance at the top – failure in openness, accountability,
clarity; 
02 Micro governance in services, partnerships and projects and
outcomes not achieved 
03 Non-compliance with codes of conduct and reduction in standards
in public life 
04 Annual Assurance Statement. 
05 Standing Orders 
06 Scheme of Administration 
07 Scheme of Delegation  
2 4 
Page 185 of 260

Page 186

16
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RR.10.0
1 Corporate Governance
Q1 23/24: Annual Assurance Statement presented to Audit Committee in June 2023 and
agreed 
Q4 22/23: Annual Assurance Statements to be presented to Audit Committee in June
2023 for 2022/23 year. See above for review of Standing Orders update. 
Q3 22/23: Annual Assurance Statement submitted annually, People Policies and Standing
Orders subject to review process (see separate risks contained within the strategic risk
profile for further information)  
Executive Director
Place; Chief
Officer Corporate
Solutions; Legal
and Governance
Manager
31-Mar-2024 
SRP.RR.11 Corporate Policies and Strategies 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.11
Risk cause
Policies may not match the aspirations of the Council's
Strategic priorities or cultural perspective. 
Risk event
Policies not monitored may become out of date 
Policies not reviewed to ensure alignment with strategic
priorities. 
Risk effect
Policies not monitored could result in non-compliance with
legislation 
Policies not aligned to strategic priorities will inhibit rather
than support implementation of strategic priorities.  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships
1. Single Midlothian Plan providing overarching direction 
2. Service plans aligned to Single Midlothian Plan. 
3. Leadership team to ensure correct approaches are adopted to get
the right results. 
4. Strategic housing investment plan, submitted to Scottish
Government in October 2022 
5. Procurement Strategy 2018 
6. Capital Strategy 
7. Integrated Joint Board (IJB) Plan 
8. IJB Strategic needs assessment 
9. Midlothian Local Development Plan 2017 – the Council’s corporate
spatial strategy.  
2 3 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.11.0
2 Accessibility Strategy
Q1 23/24 : Education accessibility strategy updated
Q4 22/23: Education staff will work with Place colleagues to update the Accessibility
Strategy for session 23/24 
Chief Officer
Place; Chief
Operating Officer
31-Aug 2023
31 Oct 2023  
Page 186 of 260

Page 187

17
Q3 22/23: Work progresses through the building audit programme 
Q2 22/23: Education working with Property colleagues to refresh building data including
information on building accessibility. Once work is complete, a work stream will be
progressed to ensure Council compliance. 
Education; Senior
Manager Property
and Facilities
Management
31-Mar-2023
SRP.RA.11.0
5 Antisocial Behaviour Policy Q3 22/23: Work continues  Chief Officer Place 31-Dec-2023 
SRP.RA.11.0
6 Transformation Blueprint  2023 - 2027
Q1 23/24: Transformation Blueprint presented to Council in June 2023 and agreed.
Transformation Manager appointed – expected start date Q2 2023/24. Review of BTB
governance complete and closure report produced for BTSG Q2 2023/24. 
Q3 22/23: Development of Strategic Plan and MTFS for next term of Council being
progressed to support decisions about what services, beyond those which are statutory
can be provided. This facilitates setting of the 2023/24 budget in February 2023  
Chief Executive;
Chief Finance
Officer
31-Dec-2023 
SRP.RR.11.0
1 Parental Engagement Strategy
Q1 23/24: Draft Parental Involvement & Engagement Policy at consultation
Q4 22/23 – Positive engagement continues with Parents and learners.
Q3 22/23: A Parental Engagement strategy and a Parent Council Toolkit have been
developed and implemented in October 2022. The Parental Learner Liaison Officer
continues to engage with parents and learners through Parent Council Chairs, Parent/
learner Conferences as well as hearing their voice through National Discussions and
consultations.
Q2 22/23: Parental Learner Liaison Officer has produced a draft Parental Engagement
Strategy looking at examples throughout Scotland and a consultation with all stakeholders
is underway. Following a review with Parent Council Chairs, a Parental Engagement
calendar has been created for next session to support PC Chairs with the information and
structure they need. The National Parental Involvement & Engagement survey has been
rolled out to all Primary, Secondary & Special School parents with data to be evaluated in
July. Parent Working Groups have been created to support specific interests and priorities
– Consultation, Equity, Digital Learning, ASN & DWY/Positive Destinations. A Parent
Council ‘Toolkit’ has been created to inform Parents of the functions of a Parent Council,
provide support, signposting and remits. This will provide a more consistent structure
within Midlothian of all Parent Councils and potentially boost numbers. Social Media has
been created for Parental Engagement and the design of a webpage to add to the Council
Website is underway. Draft plans for our first Parent Conference in Q1 of next session is
underway. The same is to be said for a Pupil Conference. The PLLO is now an active
member in the SEIC Young Persons Involvement Group and regularly meets the
Education Scotland’s Attainment Advisor.  
Chief Operating
Officer Education
31-Oct-23 
31-Oct-2022 
SRP.RR.12 Internal Control Environment 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.12
Risk cause
Work procedures/process inadvertently create the capacity
for fraud and waste to occur. 
Internal Controls requiring more time, effort or cost than the
Chief Executive,
Executive
Director Children,
Young People
1. Services have been prompted to consider fraud and waste within
Service Risk Registers. 
2. Risk Management Guide provides direction on the need to balance
time, effort and cost against benefit of risk controls. 
2 3 
Page 187 of 260

Page 188

18
risk being managed. 
Mangers failing to follow procedures and keep systems
updated with accurate information 
Risk event
Persons exploiting opportunities to commit fraud 
Waste and errors 
Changing risk landscape associated with remote working
solutions. 
Risk effect
Waste and loss 
Risks over managed with risk controls costing more than
the potential loss being managed. 
Increased opportunity for fraud or financial loss has direct
impact on management information. Has adverse effect on
service performance  
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships
3. Internal Audit examine internal control arrangements based largely
on the risk registers. 
4. Whistleblowing Policy (subject to review) 
5. Internal and external assurance. 
6. E-learning for staff to complete mandatory training for fraud
awareness. 
7. Implemented changes to business processes and procedures to
maintain and enhance internal control. 
8. Bi-annual updates to Audit committee on progress with
recommendations noted in the annual governance statement. 
9. Continue remind staff of secondary employment/outside interests
and gifts & hospitality 
10. Digital induction for all new employees (with service exceptions),
including legal, HR, procurement, health and safety. Control at entry to
organisation. 
11. Management Development Programme, delivered in partnership
with Edinburgh College, provides reinforcement of organisational
regulatory obligations. 
12. The Integrity Group continues to meet to improve the Council’s
resilience to fraud, corruption, theft and crime (including cybercrime),
maintaining proper risk management, governance and internal control
processes and systems to ensure probity in systems and operations,
and mitigation of risks, including the prevention, detection and
resolution of fraud and irregularities. Management is also responsible
for checking that the arrangements and controls are operating
effectively and obtaining assurances from internal compliance, risk,
inspection, quality, and control functions.                
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.12.0
4 Review of Serious Organised Crime (SOC) group
Q1 2023/24: Developing SOC Strategy, to include Insider Threat checklist 
Q3 22/23: Review continues
Q2 22/23: Review of SOC has begun with stakeholder engagement underway  
Chief Officer Place 31-Mar-2024 
SRP.RR.13 Climate Change 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.13
Risk cause
Council Services not adequately engaged, resourced or
directed to fulfil the requirements of the Climate Change
Act. 
Risk event
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
1. Statutory requirement to report on compliance with climate change
duties. 
2. Council Carbon Management Plan 
3. Approval of a Corporate Climate Change Strategy and action plan 
4. CPP Board for Climate Change to bring strategic focus and
oversight of plans and progress. 
5 5 
Page 188 of 260

Page 189

19
Council Services not responding to the Climate Change Act
with sufficient pace. 
Risk effect 
Council failing to meet its obligation under the Climate
Change (Scotland) Act 2009 and incurring the associated
reputational damage.  
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships;
Senior Manager
Planning,
Sustainable
Growth and
Investment
5. Resilience Seminars              
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.13.0
3 Recruitment of Climate Change Officer Q1 22/23: Service Review continues.  
Chief Officer
Place; Senior
Manager
Planning,
Sustainable
Growth and
Investment
31 March
2024 
SRP.RA.13.0
4 Delivery of the BTB Board Carbon Neutral by 2030
Q3 22/23: Work underway to develop a fully costed Climate Change action plan to be
presented to members in Q4 2022/23 (now Q2 2023/24)
Q2 22/23: Carbon Management Plan requires to be reviewed and resourced adequately.
There is a requirement for a cross Council approach to achieve carbon neutral by 2030.
Work is underway in discrete areas to contribute to achievement of the ambition, but
financial resource and staffing is required to develop an overarching engagement and
action plan.  
Chief Officer
Place; Senior
Manager
Planning,
Sustainable
Growth and
Investment
31-Mar-2030 
SRP.RA.13.0
5 Development of the Strategic Plan 2023-27
Q3 22/23: Carbon Neutral by 2030 is a strategic priority within the draft strategic plan 
(SMP)
Q3 22/23: Carbon Neutral by 2030 is a strategic priority within the draft strategic plan  
Chief Officer
Place; Senior
Manager
Planning,
Sustainable
31-Mar-2027 
Page 189 of 260

Page 190

20
Growth and
Investment 
SRP.RR.14.1 Scottish Child Abuse Inquiry 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.14.1
Risk Cause: Midlothian Council and its legacy
organisations, predating the creation of Midlothian Council
in 1996, have been involved in the provision of care of
children going back to living memory. During this time there
is the likelihood that the care children received fell below
standards of care now in place. There is the further
potential that some people in the care of Midlothian Council
and its legacy organisations were subject to abuse by
those who were employed to care for them. 
Risk Event: The Scottish Government began an Inquiry
into cases of Child Abuse occurring prior to 17 December
2014, the intention of this enquiry is to identify historic case
of abuse which have to date gone unreported. 
The most recent Section 21 notice around the Foster Care
Case Study is a significant piece of work. The request for
information from 1930 to date is very challenging given the
volume of files that require to be read and analysed. 
Risk Effect: If the inquiry finds historic cases of abuse in
Midlothian this could damage the reputation of the Council
and could place doubt in the eyes of the public as to the
safety of these currently in care. There is significant scope
for a substantial financial impact arising from claims of
historic abuse. Some existing employees may be affected
by the inquiry and subsequent claims of abuse. 
Chief Executive;
Executive
Director Children,
Young People
and Partnerships;
Chief Social
Worker
The Council have set up an Abuse Inquiry Project Team to support the
Council to prepare for information requests to support the Inquiry. 
In addition, we have a Claims Project Team who have mapped out
how we shall manage any future claims reported against the Local
Authority. 
The Inquiry Team have established a Project Plan covering: 
1. Residential establishments, List D Schools and Foster Carers:
identifying Children’s homes, Foster Carers and any List D Schools in
Midlothian over the last 100 years and researching historic records. 
2. Record Audit: reviewing the Council’s existing paper and electronic
recordkeeping systems to identify relevant records and map them to
residential establishments. This also includes, where possible, noting
the Council’s historic recordkeeping policies, such as retention
schedules. 
3. Cataloguing/Indexing: checking and updating existing recordkeeping
systems for accuracy and consistency, enabling effective information
retrieval when requested by the Inquiry. 
The Project Team have established a Project Plan covering: 
4. Ascertaining the succession and insurance position in relation to
potential historic child abuse claims. 
5. Ascertaining and agreeing Midlothian Council’s legal position/
approach in dealing with the potential historic child abuse claims. 
6. Identifying the need for guidance, protocol, templates etc. should/if
any claims be made against the council. 
7. Consideration to identifying if additional staffing will be required as
expected deluge of FOI’s SAR’s in 2018 from solicitors of potential
claimants. 
8. Project team is in place with project plan with a range of identified
actions which are being progressed. Monthly meetings to progress
project plan. 
9. The SCAI Social Worker is very competent and experienced in this
area of work and provides quarterly updates on their findings from the
file read. This is a real strength within this area of work. The CSWO
and Principal Solicitor meet regularly with the social worker to discuss
findings from the file read.  
4 4 
Page 190 of 260

Page 191

21              
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.14.0
3 Foster Care and Residential Care File Review
Q1 23/24: Inquiry has heard all the evidence for the Sect 21 submissions around foster
care. We continue to await the findings by Lady Smith. The redress system is in place and
there is a lot of activity around this area of work which requires significant input from our
social worker within the Scottish Child Abuse team. 
Children’s
Services
Management
Team; Chief
Social Worker 
31 March
2024 
SRP.RR.16 Growing Council 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.16
Risk cause
Population growth in Midlothian over the next 10 – 15 years
will see Midlothian become the fastest growing Council in
Scotland. Ages. 0-15 population increase, projected at 20%
and 75+ population increase projected to increase by
100% between 2014 and 2039. 
Risk event 
Failure to resource and plan for these rises will significantly
impact the Councils ability to fulfil its statutory obligations in
relation to these groups. 
Risk effect Inadequate capacity within the school estate to
cope with the projected increase in pupil numbers. In
sufficient provision to support an aging population placing
costly inefficiencies on other parts of the care sector.
General population increase placing additional demand on
infrastructure including GP services. Increased pressure on
infrastructure, services e.g., waste collection and growth of
road network as new development roads are adopted.  
Head of Adult and
Social Care;
Director of
Education; Chief
Executive;
Executive
Director Place;
Joan Tranent
1. Local development plan and supplementary guidance on developer
contributions. 
2. Services planning future service provision on the basis of anticipated
service demands 
3. The change programme 
4. Learning Estate Strategy 
5. Capital Plan Prioritisation 
6. Strategic Housing Investment Strategy 
7. Rent Review Strategy 
8. Joint needs assessment used to develop - IJB Strategic Plan 
9. Capital Plan and Asset Management Board will scrutinise and
challenge slippage on capital programmes recognising that slippage
can have an adverse impact on financial sustainability and also the
delivery on assets required to support capital growth. 
10. City Deal provides the opportunity to support inclusive growth.  
4 4 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.16.0
1 Capital Programme
Q1 23/24: The Capital Plan in its current format is unaffordable due to rising costs of
construction, inflation and EU-Exit/post pandemic and other economic pressures. A review
of the Capital Plan is underway to determine affordability, prioritisation and options
presented to members for consideration in Q2 2023/24.
Director of
Education;
Executive Director
Place
31-Aug-2023 
Page 191 of 260

Page 192

22 
Q4 22/23. A number of prioritised Learning Estate strategy projects are nit funded within
existing Capital Programme, some have external funding which is at potential risk.
Q3 22/23: Capital Plan prioritisation also includes Learning Estate Strategy expanded to
meet statutory requirements
Q2 22/23: Latest roll projections indicate that that we will breach capacity in some schools
in Aug 2023. Capital programme updated based on outcome of review of Learning Estate
Strategy underway  
SRP.RA.16.0
2 Capital Plan reprioritisation
Q1 23/24: update as above
Q3 22/23: In light of rising costs through inflationary impacts, EU Exit and post pandemic
economic shifts, work is ongoing to review the current capital plan and reprioritise the
programme. This will be reported to Council in Q4 22/23 for review and approval.  
Executive Director
Place, Executive
Director Children,
Young People and
Partnerships,
Chief Finance
Officer, Head of
Development
31-Mar-2023 
SRP.RR.17 UK Decision to leave the EU 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.17
Risk cause
UK vote to leave the European Union 
Risk event
UK leaving the European Union 
Risk effect The impacts associated with the UK's decision
to leave the UK have yet to be realised and will only
become clear once the final terms of the UK's departure
are finalised. There are some direct potential impacts such
as an end to EU funding of Council co-ordinated projects
and indirect impacts on industries undertaken within the
geographical area which have relied on EU funding, such
as agriculture. There are wider potential implications arising
from uncertainty regarding the resident status of EU
nationals, post any exit agreement, and the availability of
workers from outside the UK accessing the job market here
in the future. These factors have the potential to impact on
the availability of the right people with the right skills being
available to help grow the economy here in Midlothian. One
area this could affect the Council could be in the delivery of
future building projects within Midlothian which could curtail
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships
01 – Risk and Resilience Group 
02 – Taking a risk management approach to identifying and assessing
anticipated impacts 
03 – Working with a range of national and local bodies to inform
preparatory arrangements. 
04 – EU Settlement scheme promoted on Council Internet to support
those living and working in Midlothian to access the Home Office
scheme.  
4 5 
Page 192 of 260

Page 193

23
further economic growth.                
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.17.0
1 Refresh of Economic Strategy Q2 22/23: Report recommendations agreed by Council in Oct 2022. Work is now
underway to refresh the Economic Strategy by March 2023   Chief Officer Place 31 Aug 2023 
SRP.RR.19 Health & Safety 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.19
Risk cause
Failing to identify and rectify non-compliance with Health
and Safety regulations. 
Risk event
Employees required to undertake tasks they are not
competent to. 
Statutorily driven health and safety protective
arrangements for service users and employees not
implemented correctly. 
Non-compliance with policy and procedure 
Not undertaking audits and inspections to confirm
adherence to policy and legislative requirements. 
Risk effect 
Serious injury of ill health impact on employees and or
service users. 
Negative impact on outcomes for customers/service users. 
Service users and employees exposed to hazards where
statutory requirements exist. 
Statutory health and safety - duty of care over services
users and employees not met. 
Criminal prosecution of the Corporate body and or
individuals through Corporate Homicide (Corporate
Manslaughter) Significant financial penalties from Criminal
Prosecution.  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships;
Protective
Services Senior
Manager; Health,
Safety and
Resilience
Manager
1 - Health Safety and Wellbeing Strategy 
2 - Suite of Health and Safety Management Arrangements developed
setting out council response to statutory obligations (Revised 2021) 
3 - Comprehensive range of Health & Safety Management &
Assessment based development opportunities for line managers 
4 - Use of Health & Safety Management Information System to
enhance information transfer and organisational efficiency 
5 - Comprehensive training programme in place to support those with
responsibility for managing health and safety. 
6 - Guidance and Risk assessment templates to support COVID 19
response. 
7 - Use of comprehensive audit programme to confirm the application
of agreed management Arrangements and Council Policy. 
8 - New risk assessment guidance and support for managers rapidly
deployed in response to COVID 19 in line with associated Scottish
Government guidance.  
3 5 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
Page 193 of 260

Page 194

24
SRP.RA.19.0
1 Delivery of Health, Safety and Wellbeing Strategy
Q1 2023/24 Implementation of the 23/24  Protective Services  Health, Safety & Resilience
Service Plan has commenced 
Note the Health Safety & Resilience Team Service Review is scheduled to commence in
Q2 
Q4 22/23: A Health, Safety & Resilience Service Plan, 2023/24 has been drafted and is
being implemented.
Q3 22/23: Health, Safety and Resilience Manager started 9 January 2023.
Q2 22/23: Appointment made for Team Manager Health, Safety & Resilience. Due to take
up post in Jan 2023.  
Chief Officer
Place; Edel Ryan 
31 March
2024 
31-Mar-2023 
SRP.RA.19.0
7 H&S audit across all Council estate
Q1 23/24 Zurich Insurance high level audit of H&S scheduled for July 2023.
Recommendations will be implemented where necessary
Q4 22/23: Health, Safety and Resilience Service Plan’s revised suggested approach –
Training, Self-Assessment and Audit. 
Zurich Insurance high level audit of H&S due to start in July 2023.
Q3 22/23: Zurich rolling out training across the Council 
Q2 22/23: Protective Services and Property Service are progressing a Health and Safety
building audit across the full Council estate, which will inform the development of
associated action plans taking a risk based assessment of the findings. Asbestos
inspection programme commenced with first round of inspections focussed on the learning
estate over the summer holiday period. Review of arrangements for first aid and fire
warden provision commenced.
Chief Officer Place 
31 – March -
2024 
SRP.RR.20 Early Years Expansion (1140 Hours) 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.20
Risk cause
Population growth in Midlothian over the next 10 - 15 years
will see Midlothian become the fastest growing Council in
Scotland. Ages. 0-15 population increase, projected at 20%
in addition the Scottish Government has made a
commitment to increase the current provision of free early
years care from 600 to 1140 hours. 
Risk event 
Failure to resource and plan for these rises will significantly
impact the Councils ability to fulfil its statutory obligations in
relation to these groups. 
The sustainable rate review may lead to significant
increase in funding to providers; maintaining current rate is
not an option if not deemed sustainable. The result could
lead to a funding gap in future years. 
Risk effect 
Chief Executive;
Executive
Director Place;
Executive
Director Children,
Young People
and Partnerships;
Chief Finance
Officer
1. Learning Estate Strategy 
2. Early Years Expansion to 1140 hours updates 
3. Capital Strategy 
4. School Roll Projections to be reviewed and updated 
5. Business Support and Finance Business Partners reviewing external
funding landscape closely for future funding options  4 5 
Page 194 of 260

Page 195

25
Inadequate capacity within the school estate and/or Early
Years to cope with the projected increase in numbers. Lack
of staffing and/or financial support to build new schools
Potential for additional unfunded request to place 4 year
olds with August to December birthdays requesting
additional year of 1140 hours, not currently funded by
Scottish Government.                
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RR.20.0
1 1140 future years funding
Q1 23/24 Draft guidance from SG. Enhanced guidance due re sustainable rate but no
additional funding for LAs
Q4 22/23 Projects have been reviewed and rationalised to reflect the Learning Estate
strategy, regular updates provided to Scottish Futures Trust.
Sustainable rate discussions continue at a national level. Impact of uncertainty at a local
level is a concern and may have a negative on provision. 
Q3 22/23: No change – awaiting outcome of funding position
Q2 22/23: Potential increased costs associated with paying a sustainable rate to partner
providers may place further pressure on containing service delivery costs within available
funding. Scottish Government funding for 2023/24 will be known during Q3.   
Executive Director
Children, Young
People and
Partnerships,
Chief Finance
Officer
August 2023 
31-Mar-2023 
SRP.RR.21 Cyber Security 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.RR.21
Risk Cause:
Malicious attempts to damage, disrupt or gain unauthorised
access to Council computer systems, networks or devices 
Risk Event:
The Council is at significant risk of cyber-attack from
Ransomware Phishing Emails, Advanced Persistent
Threats (APT) and Distributed Denial of Service Attacks
(DDOS) attacks. Hacking and Social Engineering. 
Risk Effect:
Access to Council systems by cyber criminals and foreign
intelligence agencies for financial, commercial or
information gathering reasons. This could lead to
significant financial losses, data compromise and
subsequent regulatory sanction if our technical and
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
1. Implementation of and compliance with the Scottish Government
Cyber Resiliency Public Sector Action Plan 
2. Cyber Essentials Plus Certification 
3. Public Sector Network (PSN) Certification 
4. Appropriate technical and organisational measures deployed to
reduce the likelihood and impact of an attack 
5. Employing an Information Governance and Security Lead 
6. Implementing Scottish Government Cyber Security Action Plan 
7. Creating a Midlothian Cyber Defence Action Plan. 
8. Adoption of the NCSC (National Cyber Security Centre) Active
Cyber Defence programme  
3 5 
Page 195 of 260

Page 196

26
organisational measures are deemed insufficient. 
Severe business disruption including the almost total loss
of critical IT systems and networks leading to significant
service delivery challenges.  
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships,
Head of
Development,
Senior Manager
Protective
Services, Health,
Safety &
Resilience
Manager              
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.21.1 Appropriate Technical and Organisational Measures
Q1 23/24
1. Achieved Cyber Essentials Plus Certification
2. Preparations completed for Q2 2023/2024 PSN Certification, including
submission to Cabinet Office. 
3. Provided significant Information Governance and Security advice for the
deployment of M365 and Google Workspace
4. Responded to numerous threat alerts to ensure the security of the Council’s
network
5. Engaged with Cyber Incident Response company to review the Councils Cyber
Incident response capability in Q2 
Q4 22/23: Action/mitigation includes:- 
1. Appointment of Principal Data & Information Officer to implement best practices for
security and information governance through configuration of new Microsoft modules
2. Staff phishing exercise completed 
3. Cyber security training software implemented via MS Teams and deployed
4. Preparations completed for Q1 2023/24 PSN Audit/ Penetration Testing, and Cyber
Essentials certification  
5. Patching / server upgrades across various applications to ensure potential security
vulnerabilities are closed
6. Continued engagement with NCSC and other public sector bodies to identify, share and
implement any emerging cyber security best practices
Chief Digital
Officer; Cyber
Security,
Information
Governance and
Compliance
Manager 
31-Mar-2024 
SRP.IR.12 Cost of Living Crisis 
Page 196 of 260

Page 197

27
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.IR.12
Risk cause
The UK is currently facing an unprecedented storm of
increasing prices, bills and tax. The 40 year high inflation
rate of 9% is the main driver of the cost of living crisis
which has outstripped wage and benefit increases. 
Risk event
Rapid ongoing rise of energy prices (gas, electricity and
fuel) as well as food and drink prices. 
Risk effect 
The impact on households is already being noted with 87%
of adults in the UK reported an increase in their cost of
living in April 2022 (Office for National Statistics;
Francis-Devine et al, 2022). The price rises will impact
low-income households the hardest as a larger proportion
of their bills are on energy and food. The Resolution
Foundation estimates an extra 1.3 million people will fall
into absolute poverty in 2023, including 500,000 children.  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care
1. Council Cost of Living Task Force to oversee the Council’s response
to the crisis 
2. Allocation of LACER funding to support those most affected 
3. Strategic Evaluation Partner appointed to create poverty profile 
4. Community Planning Partnership has established a Midlothian
Strategic Poverty Prevention Group co-chaired by Council Leader and
Director of Public Health 
5. New Child Poverty chair and lead appointed (Executive Director
Children, Young People and Partnerships) 
6. Child Poverty self-evaluation underway with Improvement Service  
3 5
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.12.1 Cost of Living Task Force
Q1 23/24: Meetings continuing
Q3 22/23: Establishment of Warm and Welcoming Hubs in Lasswade and Newbattle
libraries for the winter
Q2 22/23: The Council agreed to establish a Cost of Living Crisis Task Force at its
meeting on 28 June 2022 and is now meeting fortnightly. Membership is drawn across
CMT, cross party member representation and NHS.  
Chief Executive Ongoing
SRP.RA.12.2 LACER funding Q2 22/23: Identification of 15 trusted partners to distribute funding in communities for food
and fuel, wash and dry provision and support to establish re-heatable food initiatives.  
Lifelong Learning
and Employability
31 March
2023
Page 197 of 260

Page 198

28 
Strategic Opportunities 
SRP.OP.01 Shawfair 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.OP.01 The delivery of a new sustainable low carbon community at
Shawfair.  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Senior Manager
Planning,
Sustainable
Growth and
Investment
1. Shawfair Landowners Group meets quarterly. 
2. Legal agreement with developers to secure developer contributions
(Section 75) towards infrastructure. 
3. Approved masterplan and design guide for the entire community 
4. Business and industrial provision, including small business incubator
space. 
5. Circa 4000 new homes 
6. A school campus comprising Early Years, Nursery, Primary,
Secondary & Life Long Learning provision, currently not reflected in
Capital Plan
7. New Primary schools 
8. Public Transport infrastructure including railway station. 
9. Midlothian Energy Ltd (Joint Venture between MLC and Vattenfall)  
5 4 
Related
Action Code Related Action Related action latest note Managed By Due Date Status 
SRP.OP.02 Borders Rail 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.OP.02
Passenger numbers after three years of operation are
above projections. The railway has been, and continues to
be a catalyst for economic development, access to training
and labour markets, tourism growth, environmental
improvements must notably in town centres, and access to
the countryside.  
Chief Executive,
Executive
Director Place,
Chief Officer
Place
1. Monitored by Economic Development. 
2. Maximising the Impact: A blueprint for the Future - published by the
blueprint group involving Scottish Government, Scottish Borders,
Midlothian and City of Edinburgh Council, Transport Scotland, Scottish
Enterprise and Visit Scotland. The document sets out the ambitions of
the partners to realise the full potential of the new Railway. 
3. Timely submission of bids for approval by the Blueprint Group 
4. Close monitoring of approved funded projects. 
5. Borders rail subgroup chaired by Midlothian Council Chief
Executive.  
5 4 
Page 198 of 260

Page 199

29              
Related
Action Code Related Action Related action latest note Managed By Due Date Status         
SRP.OP.03 Easter Bush - Penicuik 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.OP.03
One of Midlothian’s largest and most significant
employment areas. Fast Growing opportunities in Science
Technology Engineering and Mathematics (STEM) with
opportunities to link with education. Partnership links to
schools and university sector at the 'Bush' to promote
STEM. 
Need to secure long-term strategic road access to ensure
continued growth.  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of
Development
1. Planning in place around creating Secondary Schools as centres for
excellence linked to specialisms including Science Technology
Engineering and Mathematics (STEM). 
2. Land allocated for expansion. 
3. Midlothian Science Zone. 
4. City Deal funding to provide for growth and strategic road access.  
5 4 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.OP.03.A
2 A701/A702 Trunk Road Improvements
Q4 22/23
The funding gap associated with this project is estimated to be £33.2m. Midlothian Council
submitted an application to the UKG Levelling Up Fund (LUF) to attract alternative funding
into the project to close this gap. The application was unsuccessful. Alternative funding
opportunities and means to phase and prioritise the programme are currently under
consideration. 
A revision to alignments due to landfill avoidance and required increase in roundabout
sizes at Bush Loan and the A702 Spur Road junctions was made to the specimen design.
This is progressing with the target of submitting a planning application Q1 2024. 
31- March -
2024 
Page 199 of 260

Page 200

30
SRP.OP.04 City Deal 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.OP.04
South East Scotland Region City Deal - a bid for funding to
Scottish and UK Governments to accelerate economic
growth through investment in infrastructure/ housing/ skills
and innovation. 200 Council Houses linked to the City Deal.  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships, 
1. City Deal signed in August 2018. 
2. Maintain strong Midlothian involvement through the City Deal
governance structure. 
3. Midlothian City Deal Key Officer (Internal) Group. 
4. Securing best arrangements for Midlothian through close liaison with
partners and conclusion of business cases.  
4 5 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.OP.04.0
2 Realisation of outcomes of respective work streams
Q1 23/24: Work continues on the relevant programmes.
Q3 22/23: Midlothian has now completed its year as chair. Work continues on the relevant
programmes.
Q2 22/23: For the 2022 calendar year Midlothian is the chair of the CRD programme
(annual rotation across the six Local Authorities).  
Executive Director
Place 31-Mar-2024 
SRP.OP.05 Growing Council 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.OP.05 Midlothian Council has been identified as the fastest
growing Council’s in Scotland. This brings the opportunity
Chief Executive,
Executive
1. Community Planning Partnership 
2. The Single Midlothian Plan  5 5 
Page 200 of 260

Page 201

31
to support the Council vision of being ‘A Great Place to
Grow’. As a growing Council this brings the opportunity to
redevelop parts of Midlothian, improve infrastructure with a
focus on area targeting, improving economic opportunities,
improving education and health outcome. 
This growth creates the opportunity to meet the housing
need with 25% of new homes being built in the affordable
housing bracket, in addition to the expansion in Council
House building. This construction will directly support
employment in construction and will see a steady increase
in the volume of Council tax received over time.  
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships, 
3. Strategic Housing Investment Plan (SHIP)                
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.16.0
1 Capital Programme
Q4 22/23 Funding of statutory learning estate projects is required and not currently
reflected in the Capital plan putting projects at potential risk,
Q3 22/23: Capital Plan prioritisation also includes Learning Estate Strategy expanded to
meet statutory requirements.
Q2 22/23: Latest roll projections indicate that that we will breach capacity in some schools
in Aug 2023. Capital programme updated based on outcome of review of Learning Estate
Strategy underway  
Director of
Education;
Executive Director
Place
31-Aug-2023 
SRP.RA.16.0
2 Capital Plan reprioritisation
Q1 23/24: The Capital Plan in its current format is unaffordable due to rising costs of
construction, inflation and EU-Exit/post pandemic and other economic pressures. A review
of the Capital Plan is underway to determine affordability, prioritisation and options
presented to members for consideration in Q2 2023/24. 
Q3 22/23: In light of rising costs through inflationary impacts, EU Exit and post pandemic
economic shifts, work is ongoing to review the current capital plan and reprioritise the
programme. This will be reported to Council in Q4 22/23 for review and approval.  
Executive Director
Place, Executive
Director Children,
Young People and
Partnerships,
Chief Finance
Officer, Head of
Development
31-Mar-2023 
Page 201 of 260

Page 202

32
SRP.OP.07 Creating a world Class Education System 
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk
Evaluation
SRP.OP.07
The Centres of Excellence model is a core part of the
Council's strategy to create a world-class education system
in Midlothian. This is an ambitious project designed to
deliver excellence and equity with a particular emphasis on
interrupting the cycle of poverty. 
Risk event:
The Phase 2 Equipped for Learning plan has a strong
focus on transforming classroom practice and learner
outcomes. This can only be achieved if effective technical
support for EfL is in place to support this change. 
Programme is at risk of succeeding due to escalating
inflation costs and resultant pressure on the overall capital
plan budget, as well as resourcing to deliver Learning
Estate programme.  
Risk Effect: 
Without the technical support and appropriate infrastructure
we will not achieve the change resulting in a negative
impact on learners experiences and outcomes  
Chief Executive,
Executive
Director Children,
Young People
and Partnerships,
Executive
Director Place,
Director Health
and Social Care,
Head of Adult and
Social Care;
Chief Officer
Corporate
Solutions; 
Chief Finance
Officer, Chief
Officer Place,
Chief Operating
Officer Education,
Chief Officer
Young People
and Partnerships,
Head of
Development 
1. Digital Centre of Excellence at Newbattle Community High School 
2. Partnership agreement with the University of Edinburgh 
3. Beeslack Replacement High School, pilot project for next round of
SFT funding – funding model building in energy efficiency targets 
4. Accelerating our ambition – Digital Strategy 
5. Review of Digital team to support Digital Centre for Excellence  
4 5 
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.OP.A.07
.01 Research and development
Q1 23/24: CivTech project successfully completed the pre-contractual agreement stage.
Further grant funding from SFT has enabled continuation of development of the platform
and insights in Midlothian schools and expansion to incorporate monitoring and insights
into Dalkeith office buildings. The project has been selected to present again at the
Learning Places Scotland conference and is engaging with the Scottish AI Alliance. 
Executive Director
Children, Young
People and
Partnerships
31-Aug-2023 
SRP.OP.A.07
.03 Equipped for Learning
Q3 22/23: Appointment made for Google Administrator and commenced 4 Jan 2023.
Q2 22/23: Recruitment has commenced for the Google Administrator post which will
provide additional capability and enhance the programme delivery  
Executive Director
Children, Young
People and
Partnerships
31-Dec-2022 
Page 202 of 260

Page 203

Audit Committee
Monday 30 October 2023
Item No 5.4 
Audit Committee Annual / End of Term Report 2022/23 
Report by Chair of the Audit Committee 
Report for Decision 
1 Recommendations 
The Audit Committee is asked to approve the Audit Committee Annual /
End of Term Report 2022/23 (Appendix 1) and its self-assessments
using the CIPFA Audit Committees Guidance (Appendices 2 and 3),
and agrees that the Audit Committee Annual / End of Term Report
2022/23 should be presented to the Council. 
2 Purpose of Report/Executive Summary 
The purpose of this report is to provide Members with the Audit
Committee Annual / End of Term Report 2022/23, which sets out how
the Audit Committee has performed against its remit and the
effectiveness of the Audit Committee in meeting its purpose based on
the annual self-assessments of the Committee against best practice,
and provides assurances to the Council. 
It is important that the Council’s Audit Committee fully complies with
best practice guidance on Audit Committees to ensure it can
demonstrate its effectiveness as a scrutiny body as a foundation for
sound corporate governance of the Council. 
The Chartered Institute of Public Finance and Accountancy (CIPFA)
Audit Committees Practical Guidance for Local Authorities and Police
2022 Edition (hereinafter referred to as CIPFA Audit Committees
Guidance) includes the production of an annual report on the
performance of the Audit Committee for submission to the Council. The
Audit Committee Annual / End of Term Report 2022/23 is appended to
this report as Appendix 1 for consideration. Midlothian Council adopts
the 2022 revisions to this best practice. 
Date 13 September 2023 
Report Contact on behalf of the Chair of the Audit Committee:
Duncan Stainbank  Tel No 01620 827353
duncan.stainbank@midlothian.gov.uk  
Page 203 of 260

Page 204

2
3 Background 
3.1 It is important that the Council’s Audit Committee fully complies with
best practice guidance on Audit Committees to ensure it can
demonstrate its effectiveness as a scrutiny body as a foundation for
sound corporate governance for the Council. 
3.2 The Chartered Institute of Public Finance and Accountancy (CIPFA)
issued an updated guidance note Audit Committees Practical Guidance
for Local Authorities and Police 2018 Edition (hereinafter referred to as
CIPFA Audit Committees Guidance). It incorporates CIPFA’s Position
Statement: Audit Committees in Local Authorities and Police which sets
out CIPFA’s view of the role and functions of an Audit Committee. 
3.3 The CIPFA Audit Committees Guidance includes the production of an
annual report on the performance of the Audit Committee against its
remit for submission to the Council.   
4 Audit Committee Annual / End of Term Report 2022/23 and Self-
Assessments  
4.1 The Audit Committee carried out self-assessments of Compliance
with the Good Practice Principles Checklist and Evaluation of
Effectiveness Toolkit from the CIPFA Audit Committees Guidance
during an Informal Session on 25 January 2022 facilitated by the Chief
Internal Auditor. A further self-assessment has been completed in
August 2023 by the Chair of the Audit Committee and the Chief Internal
Auditor and these are appended to this report as Appendix 2 (Good
Practice Principles) and Appendix 3 (Effectiveness) for consideration. 
4.2 The outcome of the self-assessments was a medium degree of
performance against the good practice principles and a medium degree
of effectiveness. Improvements were identified focussing on activity to
improve its effectiveness in fulfilling its role. In summary these are: 
• A private meeting of all Committee members with external audit and
the Chief Internal Auditor should be arranged on an annual basis
moving forward.
• Despite a recruitment campaign in May 2022 the committee does
not include two lay/co-opted independent members in accordance
with the CIPFA Guidance, consideration of any other routes to
recruit independent members should be given. 
• A review of any ongoing training needs of Committee members
covering the core areas set out in the 2022 CIPFA Guidance.   
4.3 The Audit Committee Annual / End of Term Report 2022/23 is
appended to this report as Appendix 1 for consideration. Midlothian
Council continues to adopt this best practice. It is designed both to
provide assurance to full Council and to share lessons learned and
areas of improvement to inform the new Audit Committee post local
elections in May 2022 to enhance the Audit Committee’s effectiveness
as a scrutiny body. 
Page 204 of 260

Page 205

3
5 Report Implications (Resource, Digital, Risk and Equalities) 
5.1 Resource 
The Council has provided support and resources to the Audit
Committee throughout the year including a Democratic Services Officer
as the Minute secretary. 
In terms of accountability and independence to ensure conformance
with the Public Sector Internal Audit Standards (PSIAS), the Chief
Internal Auditor reports functionally to the Audit Committee as outlined
within the Internal Audit Charter. The Chief Internal Auditor facilitated
the annual self-assessment process and the prepared the Audit
Committee Annual / End of Term Report on behalf of the Chair. 
5.2 Digital 
There are no digital implications arising from this report. 
5.3 Risk 
The role of the Audit Committee includes the high level oversight of the
effectiveness of the Council’s systems of internal financial control,
internal control and governance, including risk management. 
There is a risk that the Audit Committee does not fully comply with best
practice guidance thus limiting its effectiveness as a scrutiny body as a
foundation for sound corporate governance. The completion of the
annual self-assessment and identification of improvement actions as
evidenced through this Annual / End of Term Report will mitigate this
risk. 
5.4 Ensuring Equalities 
This report does not relate to a new or revised policy, service or budget
change, which affects people (the public or staff), so an Integrated
Impact Assessment (IIA) is not an applicable consideration. 
5.5 Additional Report Implications (See Appendix A) 
5.6 Appendices 
Appendix 1 – Audit Committee Annual Report 2022-23 
Appendix 2 – Self Evaluation CIPFA Good Practice Checklist 2022-23 
Appendix 3 – Effectiveness Self Evaluation 2022-23 
Page 205 of 260

Page 206

4
APPENDIX A – Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Although this report does not relate directly to the key priorities within
the Single Midlothian Plan to which Midlothian Council and its
Community Planning Partners have made a commitment (Reducing the
gap in economic circumstances; Reducing the gap in learning
outcomes; Reducing the gap in health outcomes; and Reducing the
impact of climate change), good governance is important to enable
Midlothian Council to deliver its key priorities in support of achieving the
Council’s objectives. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke  
Modern  
Sustainable 
Transformational 
Preventative 
Asset-based  
Continuous Improvement 
One size fits one 
None of the above 
Midlothian Council is committed to creating a great place to grow
supported by the 9 drivers for change. Self-assessment of the Audit
Committee utilising best practice toolkits underpins its own continuous
improvement to ensure that modern and sustainable governance
arrangements are in place. 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you  
Preventative and Sustainable  
Efficient and Modern  
Innovative and Ambitious 
A.4 Delivering Best Value 
Self-assessment of the Audit Committee utilising best practice toolkits
underpins its own continuous improvement to enhance its effectiveness
as a scrutiny body as a foundation for sound corporate governance of
the Council, thus supporting the delivery of the Council’s best value
duties. 
Page 206 of 260

Page 207

5
A.5 Involving Communities and Other Stakeholders 
The Audit Committee in fulfilling its governance role acts as a bridge
between the Council and other stakeholders. 
A.6 Impact on Performance and Outcomes 
The members of the Audit Committee have reflected on the
performance and outcomes against the remit of the Committee through
the completion of annual self-assessments. The identification of
improvement actions as evidenced through the Audit Committee
Annual / End of Term Report are designed to enhance its effectiveness
as a scrutiny body as a foundation for sound corporate governance of
the Council. 
A.7 Adopting a Preventative Approach 
Assurances received by the Audit Committee from Management,
Internal Audit and External Audit set out the assessment of prevention
and detection internal controls and governance arrangements. 
A.8 Supporting Sustainable Development 
This report does not relate directly to supporting sustainable
development. Good governance is important to enable Midlothian
Council to achieve its objectives. 
Page 207 of 260

Page 208

Page 208 of 260

Page 209

1
APPENDIX 1
MIDLOTHIAN COUNCIL
AUDIT COMMITTEE
ANNUAL/END OF TERM REPORT FROM THE CHAIR – 2022/23
This annual/end of term report has been prepared to inform the Midlothian Council of the work carried
out by the Council’s Audit Committee during the year 2022/23. The content and presentation of this
report meets the requirements of the CIPFA Audit Committees Practical Guidance for Local Authorities
and Police 2022 Edition (hereinafter referred to as CIPFA Audit Committees Guidance) to report to full
Council on a regular basis on the Committee’s performance in relation to the terms of reference and
the effectiveness of the Committee in meeting its purpose to share lessons learned and areas of
improvement to inform the new Audit Committee post local elections in May 2022.
Meetings
There were meetings of the Audit Committee 5 times during the financial year which included meetings
on 29 June, 27 September, 6 December 2022, 7 February and 7 March 2022 to consider reports
pertinent to the audit cycle and its terms of reference. Additionally at the start of the 2023/24 financial
year a meeting has been held on the 26 June 2023.  
The Audit Committee is a key component of Midlothian Council’s corporate governance. It provides an
independent and high-level focus on the audit, assurance and reporting arrangements that underpin
good governance and financial standards. The purpose of the audit committee is to provide
independent assurance to elected members of the adequacy of the risk management framework and
the internal control environment. It provides independent review of Midlothian Council’s governance,
risk management and control frameworks, and oversees the financial reporting and annual governance
processes. It oversees internal and external audit, helping to ensure efficient and effective assurance
arrangements are in place.
The Audit Committee reviewed the draft Annual Governance Statement 2021/22 at its meeting on 29
June 2022, and for 2022/23 at its meeting on the 26 June 2023 in order to assess whether it properly
reflects the risk environment and whether the content is consistent with its evaluation of the internal
controls and governance arrangements based on evidence received during the year. Members of the
Audit Committee have continued to be involved in the ongoing BMS review and have requested a
report to be provided to the Audit Committee. The Audit Committee scrutinised the unaudited Annual
Accounts 2022/23 of the Council at its meeting on 26 June 2023 the chair contributed several
suggestions. It reviewed the final audited accounts for 2021/22 at its meeting on 27 September 2022,
alongside the External Audit report on their annual audit 2021/22 to consider any concerns or
improvements arising from the audit, prior to recommending to the Council that they be adopted. The
Audit Committee scrutinised the Annual Report and Accounts of the Council at appropriate times in
accordance with its terms of reference, which also includes the promotion of good governance, and
financial and ethical standards. 
The Audit Committee approved the Internal Audit Charter, and the Internal Audit Strategy and Annual
Plan. It monitored Internal Audit’s performance including progress against annual plan, conformance
with Public Sector Internal Audit Standards (PSIAS), and quality assurance and improvement plan
(QAIP) within Internal Audit mid-term performance and annual assurance reports, and considered the
statutory annual audit opinion within the Internal Audit Annual Assurance Report. It considered
Internal Audit’s reports which set out executive summaries of findings, audit opinions, good practice
and recommendations associated with each assurance review, as well as other work. It monitored the
implementation of agreed actions through receipt of two reports during the year from Internal Audit.
The Audit Committee has reviewed the External Audit Strategy and Plan Overview for Midlothian
Council, considered External Audit reports including the annual report to Members and the Controller
of Audit on the annual audit of the Council, reviewed the main issues arising from the External Audit
of the Council’s statutory accounts, and monitored the implementation of agreed actions arising.
Page 209 of 260

Page 210

2
The Audit Committee received quarterly update reports from the Chief Officer Place during the year
on strategic risks and mitigations. The report requested in June 2020 on the review and scrutiny of the
Risk Management Policy and Strategy is still awaited (twice delayed from original December 2020
target) and monitored on the Action Log. There is a dependency on this to enable Audit Committee
oversight of Risk Management Framework to ensure it is able to demonstrate its effectiveness in
carrying out its remit.
The Audit Committee considered the adequacy and effectiveness of the Council’s counter fraud
arrangements by way of an annual report which set out the counter fraud activity and outcomes
associated with the refreshed Counter Fraud Policy and Strategy approved by Council in August 2020. 
The Audit Committee is the governance body responsible for scrutiny of the treasury management
strategy, mid-term and annual performance reports prior to their presentation to Council for approval,
in accordance with the CIPFA Treasury Management Code of Practice. This scrutiny occurred during
2022/23 at Audit Committee meetings including the Annual Treasury Management Outturn Report
2021/22 in June 2022, the Treasury Management Mid-Year Review Report 2022/23 in December 2022,
and the Treasury Management and Investment Strategy 2023/24 & Prudential Indicators in January
2022. 
The minutes of Audit Committee meetings were presented for approval by the Council, and any
exceptional items or recommendations were referred to the Council in accordance with the remit.
Membership
The Membership of the Audit Committee reflects the Council’s approved Scheme of Administration
i.e. there should be a one third equal split on all Committees reflecting the number of Councillors for
each political party (May 2022), being five Members of the Council. A recruitment advert for an
Independent Audit Committee Chair and Member was issued in May 2022, however no candidates
applied for these positions, as a result agreement to rotate the Chair across the three political parties
was agreed. The lack of independent members does not comply with the CIPFA Position Statement
which recommends that each authority audit committee should include at least two co-opted
independent members. However, this situation is similar to many Local Authority Audit Committees. 
The Committee membership during the year included Councillors W McEwan, S McKenzie, D Milligan,
E Scott and P Smaill (Chair).
The attendance by each member at the Committee meetings throughout the year was as follows:
Member 29 June 2022 27 September
2022
6 December
2022
7 February
2023
7 March 2023
Cllr W McEwan √ √ √ √ √
Cllr S McKenzie √ √ √ √ √
Cllr D Milligan  √ √ √ √ √
Cllr E Scott √ √ √ √ √
Cllr P Smaill √ √ √ √ √
Every Audit Committee meeting in 2022/23 was quorate and attended by all members.  
All other individuals who attended the meetings are recognised as being “In Attendance” only. The
Chief Executive, Executive Directors, Chief Officer Corporate Solutions (Section 95 Officer), External
Audit (EY/Audit Scotland), and Internal Audit attend all Audit Committee meetings, and other senior
officers also routinely attend Audit Committee meetings. The Council has provided support and
resources to the Audit Committee throughout the year including a Democratic Services Officer as the
Minute secretary.  
Page 210 of 260

Page 211

3
Skills and Knowledge
Given the wider corporate governance remit of Audit Committees within local government and the
topics now covered by the external and internal audit functions, it is noteworthy that there is a range
of skills, knowledge and experience that Audit Committee members bring to the committee, not
limited to financial and business management. This enhances the quality of scrutiny and discussion of
reports at the meetings. No one committee member would be expected to be expert in all areas.
Self-Assessment of the Committee
An annual self-assessment was carried out by members of the Audit Committee on 25 January 2022
during a Development Session facilitated by the Chief Internal Auditor using the Good Practice
Principles Checklist and Evaluation of Effectiveness Toolkit from the CIPFA Audit Committees Guidance.
This was useful for Members to ensure the Committee can demonstrate its effectiveness as a scrutiny
body as a foundation for sound corporate governance of the Council.
The outcome of the self-assessments was a medium/high degree of compliance against the good
practice principles and an improving and medium degree of effectiveness. Improvements were
identified focussing on activity to improve its effectiveness in fulfilling its role. In summary these are: 
• Utilise the CIPFA Skills and Knowledge toolkit, to complement the Induction Programme
following the Local Government Elections in May 2022, at an appropriate time in line with the
Audit Cycle to support new and continuing members to fulfil their remit.
• Continue to obtain feedback on its performance in fulfilling all aspects of the Committee’s remit
from a range of Executive Directors and others who interact with the Committee to support
continuous learning and improvement.
• Review and scrutinise the revised Risk Management Policy and Strategy (expected in March
2022). It is important that the Audit Committee is given the opportunity to regularly scrutinise
the Council’s Risk Management Policy and Strategy (Risk Management Framework). This
enables the Audit Committee to fulfil its oversight role to monitor the effective development
and operation of risk management consistently across the Council and an Area where the Audit
Committee can add value by supporting improvement (No. 3 - Supporting the establishment of
arrangements for the governance of risk and for effective arrangements to manage risks).
• Continue to rely on the knowledge of those members appointed to other Committees, to
evaluate their effectiveness in fulfilling remits, on which the Audit Committee places reliance.
• Continue to ensure the application in practice of the Audit Committee’s treasury management
scrutiny role in advance of Council approval. Ensure that the Members on the Audit Committee
and Council receive Briefings and Refresher sessions on this technical area of business of
Treasury Management and Investment and Prudential Indicators to enable them to consider
reports for scrutiny and decision respectively.
• Continue to ensure appropriate scrutiny and challenge on its Action Log to ensure that Audit
Committee recommendations have been recorded and monitored to ensure they are fully
implemented to its satisfaction.
• Schedule a recruitment, selection and appointment process for the independent members of
the Audit Committee prior to May 2022 local government elections to enable those appointed
to benefit from the elected members’ induction programme.
These actions have all been implemented and the Committee have had further briefings in addition to
the Induction programme when relevant. A further self-assessment of the Audit Committee has been
completed by the Chief Internal Auditor in conjunction with the Chair of the Audit Committee in August
2023 to update the assessment based on the revised CIPFA Audit Committee Guidance 2022.This
statement demonstrated full compliance with the majority of the Guidance with the exception of the
following improvements that will be taken forward during 2023/24: 
• A private meeting of all Committee members with external audit and the Chief Internal Auditor
should be arranged on an annual basis moving forward.
Page 211 of 260

Page 212

4
• Despite a recruitment campaign in May 2022 the committee does not include two lay/co-opted
independent members in accordance with the CIPFA Guidance, consideration of any other
routes to recruit independent members should be given. 
• A review of any ongoing training needs of Committee members covering the core areas set out
in the 2022 CIPFA Guidance.   
Assurance Statement to the Council
The Audit Committee provides the following assurance to the Council:
• The Council has received the Minutes of the Audit Committee throughout the year.
• The Audit Committee has operated in accordance with its agreed terms of reference, covering
the themes of Governance, Risk and Control, Internal Audit, External Audit, Financial Reporting,
and Accountability Arrangements, and accordingly conforms to the Audit Committee principles
within the CIPFA Position Statement for Audit Committees. 
• It focused entirely on matters of risk management, internal control and governance, giving
specialist advice to the Council on the value of the audit process, on the integrity of financial
reporting and on governance arrangements, and acted as a bridge between the Council and
other stakeholders. It did this through material it received from Internal Audit, External Audit,
other Audit bodies, and assurances from Management relevant to Audit Cycle of reporting.
• The Audit Committee has reflected on its performance during the year, and has agreed areas
of improvement to enable enhanced effectiveness to fulfil its scrutiny and challenge role. 
Peter Smaill
Chair of Audit Committee
26 September 2023
Page 212 of 260

Page 213

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition 
Midlothian Council Audit Committee – self-assessment of Good Practice at August 2023 
1
Appendix 2 
Audit committee purpose and governance  Yes/Partly
/No
Comments
Does the authority have a dedicated audit committee?  The Council’s Scheme of Administration approved in May 2022 lists
the composition of the Council and its various Committees, including
the Audit Committee. 
Does the audit committee report directly to full council? 
Has the committee maintained its advisory role by not taking on
any decision-making powers? 
All Minutes of Audit Committee are circulated to full Council for noting
and approval of any of their recommendations. An annual report is
submitted by the Chair of the Audit Committee to full Council.
Yes the Committee has no direct decision making powers. 
Do the terms of reference clearly set out the purpose of the
committee in accordance with CIPFA’s 2022 Position
Statement? 
Terms of Reference of the Audit Committee are periodically reviewed
against CIPFA’s best practice by the Chief Internal Auditor. Revisions to
its Terms of Reference were approved by Council in August 2019 arising
from an update to CIPFA’s Position Statement in 2018.
Do all those charged with governance and in leadership roles
have a good understanding of the role and purpose of the
committee? 
The role and purpose of the Audit Committee is set out in the Council’s
Scheme of Administration including what it can do, the arrangements
for meetings, required quorums etc. References to the role of the Audit
Committee are made and draft agendas and reports are presented to
the Corporate Management Team by the Chief Internal Auditor in
advance of each Audit Committee meeting.
Does the audit committee escalate issues and concerns
promptly to those in governance and leadership roles?  The Audit Committee carries out the role set out in the Terms of
Reference contributing to the Council’s governance framework which is
set out in the Local Code of Corporate Governance approved by Council
in March 2021. All Minutes of the Audit Committee are circulated to full
Council for noting and approval of any recommendations. 
Does the governing body hold the audit committee to account
for its performance at least annually?  The Audit Committee annually reviews its terms of reference as part of
it carrying out a self-assessment of performance using best practice
checklists. An annual report is submitted by the Chair of the Audit
Committee to full Council. It sets out the activities to enable stakeholders
to understand how the Audit Committee has discharged its duties and
identifies areas of improvement to fulfil its remit. MLC continues to adopt
this best practice.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Page 213 of 260

Page 214

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition 
Midlothian Council Audit Committee – self-assessment of Good Practice at August 2023 
2
Appendix 2 
Functions of the committee  Yes/Partly
/No
Comments
Does the committee publish an annual report in
accordance with the 2022 guidance, including: 
compliance with the CIPFA Position Statement 2022 
results of the annual evaluation, development work undertaken
and planned improvements 
how it has fulfilled its terms of reference and the key issues
escalated in the year? 
Do the committee’s terms of reference explicitly address all the
core areas identified in CIPFA’s Position Statement?   
See Appendix 1 evaluation against the statement does not have access
to independent members despite recruitment campaign.   
See Appendix 1 evaluation of previous issues. 
• Governance arrangements  Functions in Terms of Reference Nos. 1, 3 & 4
• Assurance framework  Assurance Framework function in Terms of Reference No. 6 and explicit
references to these service delivery models in Nos. 3, 6 & 7 within the
revised Terms of Reference approved by Council in August 2019.
• Internal audit and Internal Control Arrangements
including:
o Financial management
o Value for money
o Ethics and standards
o Counter fraud and corruption 
Functions in Terms of Reference Nos. 13-24 Function in Terms of
Reference No. 12 Treasury Management and explicit references to
ethics in Functions 3 & 19 within the revised Terms of Reference
approved by Council in August 2019. 
• External audit  Functions in Terms of Reference Nos. 25-29
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Page 214 of 260

Page 215

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition 
Midlothian Council Audit Committee – self-assessment of Good Practice at August 2023 
3
Appendix 2
Functions of the committee (cont’d)  Yes/Partly
/No
Comments
• Risk management arrangements  Functions in Terms of Reference Nos. 6-8 
• Annual Governance Statement  Function in Terms of Reference No. 5 
• Assurance framework  Functions in Terms of Reference Nos. 9-11 
Over the last year, has adequate consideration been given to
all core areas?  Reports have been received that cover all core areas at meetings of
the Committee. .
Over the last year, has the committee only considered agenda
items that align with its core functions or selected wider
functions, as set out in the 2022 guidance? 
The Audit Committee has only considered items that align with its
core functions. 
Has the committee met privately with the external auditors and
head of internal audit in the last year? 
Due to the change of both Chief Internal Auditor and external audit the
committee has not yet met privately, this will be arranged to be
completed within 2023. 
Has the committee maintained its non-advisory role by not Has
the Committee been established in accordance with the 2022
guidance as follows: 
Separation from the Executive 
A size that is not unwieldy and avoids the use of substitutes 
Inclusion of lay/co-opted independent members in accordance
with legislation or CIPFA’s recommendation. 
Whilst during the year the committee membership included cabinet
members this has been resolved with new membership. 
Regular attendance by all members without substitutes evidences
compliance.
Despite a recruitment campaign lay members have not been
successful in identifying and independent members for the
Committee.  
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
No
Page 215 of 260

Page 216

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition 
Midlothian Council Audit Committee – self-assessment of Good Practice at August 2023 
4
Appendix 2 
Membership and support  Yes/Partly
/No
Comments
Have all committee members been appointed or selected to
ensure a committee membership that is knowledgeable and
skilled.   
Elected Members on the Audit Committee are selected in accordance with the
arrangements set out in the Council’s Scheme of Administration. Committee
members bring a wide variety of skills, experience and knowledge. Continued
further training and development requirements will remain under review. 
Has an evaluation of knowledge, skills and the training needs
of the chair and committee members been carried out within
the last two years? 
Following the May 2022 local government elections and appointment to the
Audit Committee the elected members’ induction programme was completed,
having assessed the needs of the Council members. 
Have regular training and support arrangements been put in
place covering the areas set out in the 2022 guidance? 
Induction training has been provided for all member which covers key areas of
the 2022 guidance further review of regular training needs is required.
Across the committee membership, is there a satisfactory level
of knowledge, as set out in the 2022 guidance? 
The Committee members have satisfactory level of knowledge and experience
in all key areas. 
Does the committee have good working relations with key
people and organisations, including external audit, internal audit
and the chief financial officer? 
The independent Chair meets with Chief Internal Auditor (CIA) in advance of
each Audit Committee meeting and has the option to meet with External
Auditors, Audit Scotland, in private. The Chair has a pre-meeting with senior
management prior to each Audit Committee meeting to enable wider context of
Council business. 
Is adequate secretariat and administrative support to the
committee provided?  A Democratic Services Officer is assigned to the Audit Committee.
Has the committee obtained positive feedback on its
performance from those interacting with the committee or
relying on its work? 
Are meetings well chaired, ensuring key agenda items are
addressed with a focus on improvement? 
The Audit Committee will continue to obtain feedback on its performance
from senior management and the external auditor. 
As reflected in the Minutes of the Committee.
Are meetings effective with a good level of discussion and
engagement from all members? 
As reflected in the Minutes of the Committee. 
Yes
Yes
Yes
Yes
Yes
Yes
Partly
Yes
Yes
Page 216 of 260

Page 217

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition 
Midlothian Council Audit Committee – self-assessment of Good Practice at August 2023 
5
Appendix 2 
Has the Committee maintained a non-political approach to
discussions throughout? 
As reflected in the Minutes of the Committee. 
Effectivenss of the committee  Yes/Partly
/No
Comments
Does the committee engage with a wide range of leaders and
managers, including discussion of audit findings, risks and
action plans with the responsible officers? 
The Chief Executive, Directors, and Section 95 Officer attend all Audit
Committee meetings and respond to members’ questions as appropriate for
the business being considered by the Committee to ensure action findings and
action plans are acted upon. The Chief Officer Place presents quarterly
updates to the Committee setting out the corporate risks and mitigations. 
Does the committee make recommendations for the
improvement of governance, risk and control arrangements? 
Recommendations are made by the Committee to Council in accordance with
the business considered by the Committee. An Action Tracker for Audit
Committee is in place to monitor completion of their recommended actions. 
Do audit committee recommendations havetraction with those
in leadership roles? 
Has the committee evaluated whether and how it is adding
value to the organisation? 
The Chief Executive, Directors, and Section 95 Officer attend all Audit
Committee meetings and respond to members’ questions as appropriate for
the business being considered by the Committee to ensure action findings
and action plans are acted upon. 
The Audit Committee carries out an annual self assessment of performance
against the CIPFA good practice checklist and the effectiveness toolkit from
the CIPFA guidance 2022 ‘audit committees’, the latter enabling evaluation of
how effectively it fulfils its Audit functions. 
Does the committee have an action plan to improve any areas
of weakness? 
As part of its annual self-assessment 2022/23 the Committee has recognised
where it could improve in respect of its scrutiny and challenge role to fulfil its
remit and to further add value. Improvements are set out within the Audit
Committee Annual/End of Term Report 2022/23.
Has this assessment been undertaken collaboratively with the
audit committee members? 
This assessment has been carried out between the chair and the Chief Internal
Auditor a Development session will be arranged for early 2024 to carry out an
assessment with all member for 2023/24. 
Yes
Yes
Yes
Yes
Yes
No
Page 217 of 260

Page 218

Page 218 of 260

Page 219

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition 
Midlothian Council Audit Committee – self-assessment of Effectiveness August 2023
1
Appendix 3
Areas where the Audit
Committee can add value by
supporting improvement
Examples of how the audit committee can add value
and provide evidence of effectiveness
Self-evaluation, examples, areas of strength and
weakness
Overall 
assessment 
5-1 See key
below 
1. Promoting the principles of
good governance and their
application to decision
making 
Supporting the development of a local code of
governance.
Providing robust review of the Annual Governance
Statement (AGS) and the assurances underpinning it.
Working with key members/governors to improve their
understanding of the AGS and their contribution to it.
Supporting reviews/audits of governance
arrangements.
Participating in self-assessments of governance
arrangements.
Working with partner audit committees to review
governance arrangements in partnerships.
Committee scrutinised Local Code of Corporate
Governance, and recommended it for Council
approval in March 2021, and scrutinised AGS
within Annual Report and Accounts 2021/22
and 2022/23. 
Pre-Meet with independent Chair prior to each
Committee meeting to provide wider context.
Committee supports the role of audit in
improving internal control and governance.
Committee considers national reports and self-
assessment toolkits.
Reliance on previous years’ informal liaison with
other Audit Committees e.g. MIJB.
5
(2021/22- 5)
2. Contributing to the
development of an effective
control environment.
Actively monitoring the implementation of
recommendations from auditors.
Encouraging ownership of the internal control
framework by appropriate managers.
Raising significant concerns over controls with
appropriate senior managers. 
Committee received periodic progress reports
from Auditors e.g. follow-up activity.
Directors attended Committee meetings to
discuss progress with Audit actions.
Action Log used to monitor completion of
Committee recommendations.
5
(2021/22- 5)
3. Supporting the
establishment of
arrangements for the
governance of risk and for
effective arrangements to
manage risks.
Reviewing risk management arrangements and their
effectiveness, e.g. risk management benchmarking.
Monitoring improvements.
Holding risk owners to account for major/strategic
risks.
A revised Risk Management Policy and Strategy
was approved by Council in August 2022. The
Committee continues to receive quarterly
reports from Chief Officer Place on strategic
risks and mitigations, with Directors in
attendance. An Internal Audit review of risk
management is scheduled in the 2023/24 Audit
Plan. 
4
(2021/22-4)
Page 219 of 260

Page 220

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition 
Midlothian Council Audit Committee – self-assessment of Effectiveness August 2023
2
Appendix 3
Areas where the Audit
Committee can add value by
supporting improvement
Examples of how the audit committee can add value
and provide evidence of effectiveness
Self-evaluation, examples, areas of strength and
weakness
Overall 
assessment 
5-1 See key
below 
4. Advising on the adequacy of
the assurance framework
and considering whether
assurance is deployed
efficiently and effectively. 
Reviewing the adequacy of the leadership team’s
assurance framework.
Specifying the committee’s assurance needs,
identifying gaps or overlaps in assurance. Seeking to
streamline assurance gathering and reporting.
Reviewing the effectiveness of assurance providers, e.g.
internal audit, risk management, external audit. 
Annual Strategies and Plans and periodic
progress Reports received from Auditors which
outline Governance and Assurance Framework,
in alignment with Audit Cycle.
Regular assurance reports provided on internal
control, governance & risk management.
4
(2021/22 -  4) 
5. Supporting effective
external audit, with a focus
on high quality and timely
audit work. 
Reviewing and supporting external audit arrangements
with focus on independence and quality.
Providing good engagement on external audit plans
and reports.
Supporting the implementation of audit
recommendations. 
External Audit Annual Plans and reports are
submitted to the Committee and supported to
conclusion of recommendations  4
(2021/22–
N/A) 
6. Supporting the quality of
the internal audit activity,
particularly by
underpinning its
organisational
independence. 
Reviewing the audit charter and functional reporting
arrangements.
Assessing the effectiveness of internal audit
arrangements, providing constructive challenge and
supporting improvements.
Actively supporting the quality assurance and
improvement programme (QAIP) of internal audit. 
Committee considered and approved the
Internal Audit Charter.
Committee considered and approved the
Internal Audit Strategy and Plan, and regular
Internal Audit reports with recommendations.
Committee received Internal Audit QAIP and
PSIAS conformance within mid-term
performance and annual assurance reports. 
5
(2021/22-5)   
4
Page 220 of 260

Page 221

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition 
Midlothian Council Audit Committee – self-assessment of Effectiveness August 2023
3
Appendix 3
Areas where the Audit
Committee can add value by
supporting improvement
Examples of how the audit committee can add value
and provide evidence of effectiveness
Self-evaluation, examples, areas of strength and
weakness
Overall 
assessment 
5-1 See key
below 
7. Aiding the achievement of
the authority’s goals and
objectives through helping
to ensure appropriate
governance, risk, control
and assurance
arrangements 
Reviewing how the governance arrangements support
the achievement of sustainable outcomes.
Reviewing major projects and programmes to ensure
that governance and assurance arrangements are in
place. 
Reviewing the effectiveness of performance
management arrangements. 
Auditors provided audit review on governance
arrangements and financial sustainability.
Reliance on other Committees fulfilling their
remits (Business Transformation Steering
Group; Performance, Review and Scrutiny);
knowledge from members appointed on those
Committees used to evaluate their
effectiveness.
(2021/22-4) 
8. Supporting the
development of robust
arrangements for ensuring
value for money. 
Ensuring that assurance on value for money
arrangements is included in the assurances received by
the audit committee.
Considering how performance in value for money is
evaluated in Annual Governance Statement (AGS).
Following up issues raised by external audit in their
value-for-money work. 
Auditors provided assurance on value for
money arrangements e.g. sustainability, and
performance management.
AGS sets out the Governance Framework
including arrangements for best value.
4
(2021/22-4)
9. Helping the authority to
implement the values of
good governance, including
effective arrangements for
countering fraud and
corruption risks.
Reviewing arrangements against the standards set out
in the Code of Practice on Managing the Risk of Fraud
and Corruption (CIPFA, 2014). 
Reviewing fraud risks and the effectiveness of the
organisation’s strategy to address those risks.
Assessing the effectiveness of ethical governance
arrangements for both staff and governors. 
Committee received Counter Fraud Annual
Report associated with refreshed Counter Fraud
Policy and Strategy approved in 2020.
Committee has requested self-assessment of
fraud risks and counter fraud controls
associated with national reports, and received
assurance reports from Integrity Group.
5
(2021/22-5)
Page 221 of 260

Page 222

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition 
Midlothian Council Audit Committee – self-assessment of Effectiveness August 2023
4
Appendix 3
Areas where the Audit
Committee can add value by
supporting improvement
Examples of how the audit committee can add value
and provide evidence of effectiveness
Self-evaluation, examples, areas of strength and
weakness
Overall 
assessment 
5-1 See key
below
10. Promoting effective public
reporting to the authority’s
stakeholders and local
community and measures
to improve transparency
and accountability.
Working with key members to improve their
understanding of the AGS and their contribution to it.
Improving how the authority discharges its
responsibilities for public reporting; for example, better
targeting at the audience, plain English.
Reviewing whether decision making through
partnership organisations remains transparent and
publicly accessible and encourages greater
transparency.
Publishing an annual report from the committee. 
Committee scrutinised Annual Report and
Accounts 2020/21 including the enhanced
Management Commentary for stakeholders.
Reliance on health and social care governance
arrangements (Integration Joint Board; IJB Audit
and Risk Committee).
Audit Committee Annual Report presented to
Council in public.
4
(2021/22-4) 
Assessment key
5 Clear evidence is available from a number of sources that the committee is actively supporting improvements across all
aspects of this area. The improvements made are clearly identifiable.
4 Clear evidence from some sources that the committee is actively and effectively supporting improvement across some
aspects of this area.
3 The committee has had mixed experience in supporting improvement in this area. There is some evidence that
demonstrates their impact but there are also significant gaps.
2 There is some evidence that the committee has supported improvements, but the impact of this support is limited.
1 No evidence can be found that the audit committee has supported improvements in this area. 
Page 222 of 260

Page 223

Audit Committee
Monday 30 October 2023
Item No 5.5 
Internal Audit Work to September 2023 
Report by Chief Internal Auditor 
Report for Decision 
1 Recommendations 
The Audit Committee is asked to:
a) Consider the Executive Summaries of the final Internal Audit assurance
reports issued associated with the delivery of the approved Internal Audit
Annual Plan 2022/23 and 2023/24;
b) Note the Internal Audit Consultancy and Other Work carried out in
accordance with the approved Internal audit Charter; and
c) Acknowledge the assurance provided on internal controls and governance
arrangements in place for the areas covered by this Internal Audit work. 
2 Purpose of Report/Executive Summary 
The purpose of this report is to provide members of the Audit Committee with
details of the recent work carried out by Internal Audit and the findings and
recommended audit actions agreed by Management to improve internal
controls and governance arrangements. 
The Internal Audit Annual Plan 2023/24 was approved by the Audit
Committee on 7 March 2023. Internal Audit has carried out work associated
with the delivery of the Plan to meet its objective of providing an opinion on
the efficacy of the Council’s risk management, internal control and
governance. 
An Executive Summary of the final Internal Audit assurance reports issued,
including audit objective, findings, good practice and recommendations
(where appropriate), and the Chief Internal Auditor’s independent and
objective opinion on the adequacy of the control environment and governance
arrangements within each audit area, is shown in Appendix 1. 
The Internal Audit function conforms to the professional standards as set out
in Public Sector Internal Audit Standards (PSIAS) (2017) including the
production of this report to communicate the results of the reviews. 
Date 4 October 2023
Report Contact: Duncan Stainbank duncan.stainbank@midlothian.gov.uk
Page 223 of 260

Page 224

2
3 Progress Report 
3.1 The Internal Audit Annual Plan 2023/24 was approved by the Audit
Committee on 7 March 2023. Internal Audit has completed the following work
in the period from 1 June to 30 September 2023 associated with the delivery
of the Plan to meet its objective of providing an opinion on the efficacy of the
Council’s risk management, internal control and governance. 
3.2 The Internal Audit function conforms to the professional standards as set out
in Public Sector Internal Audit Standards (PSIAS) (2017), including the
production of this report to communicate the results. 
3.3 Internal Audit issued final assurance reports on the following subjects:
• Information Governance
• Justice Services
• Licensing
• Purchase Cards
• Council Tax Discounts & Exemptions 
3.4 An Executive Summary of the final Internal Audit assurance report issued,
including audit objective, findings, good practice and recommendations
(where appropriate), and the Chief Internal Auditor’s independent and
objective opinion on the adequacy of the control environment and governance
arrangements within each audit area, is shown in Appendix 1.
The definitions for Internal Audit assurance categories are as follows:
Level Definition
Comprehensive
assurance
Sound risk, control, and governance systems are in place. These should be effective in mitigating
risks to the achievement of objectives. Some improvements in a few, relatively minor, areas may
be required.
Substantial
assurance
Largely satisfactory risk, control, and governance systems are in place. There is, however, some
scope for improvement as current arrangements could undermine the achievement of objectives
or leave them vulnerable to error or misuse.
Limited assurance Risk, control, and governance systems have some satisfactory aspects. There are, however, some
significant weaknesses likely to undermine the achievement of objectives and leave them
vulnerable to an unacceptable risk of error or misuse.
No assurance The systems for risk, control, and governance are ineffectively designed and operated. Objectives
are not being achieved and the risk of serious error or misuse is unacceptable. Significant
improvements are required. 
Internal Audit Consultancy and Other Work
3.5 Internal Audit staff have been involved in the following for the Council to meet
its aims and objectives, and its roles and responsibilities in accordance with
the approved Internal Audit Charter and Strategy:
a) In its critical friend role provided an independent view and challenge at
various forums including: Capital Plan Management Group, Chief Officers
Risk & Resilience Group, Integrity Group, UKSPF Oversight Board and
Information Management Group.
b) Learning and development during the research stage of new audit areas
for all Internal Audit team members and through joining virtual audit forums
(Computer Audit Sub-group) and meetings; and
Page 224 of 260

Page 225

3
c) Monitored publication of Audit Scotland reports. 
Recommendations
3.6 Recommendations in reports are suggested changes to existing procedures
or processes to improve the controls or to introduce controls where none
exist. The grading of each recommendation reflects the risk assessment of
non-implementation, being the product of the likelihood of the risk
materialising and its impact: 
High: Significant weaknesses in existing controls, leaving the Council or Service open to error, fraud,
financial loss or reputational damage, where the risk is sufficiently high to require immediate action
within one month of formally raising the issue. Added to the relevant Risk Register and included in the
relevant Assurance Statement.
Medium: Substantial weaknesses in existing controls, leaving the Council or Service open to medium
risk of error, fraud, financial loss or reputational damage requiring reasonably urgent action within
three months of formally raising the issue.
Low: Moderate weaknesses in existing controls, leaving the Council or Service open to low risk of
error, fraud, financial loss or reputational damage requiring action within six months of formally raising
the issue to improve efficiency, effectiveness and economy of operations or which otherwise require to
be brought to attention of senior management.
Outwith the report, Internal Audit informs operational managers about other matters as part of
continuous improvement. 
3.7 The table below summarises the number of Internal Audit recommendations
made during 2023/24:
Recs Rating 2023/24 Number of Recs
High 1
Medium 7
Low 25
Sub-total reported this period 33
Previously reported 0
Total 33 
Recommendations agreed with action plan 33
Not agreed; risk accepted 0
Total 33 
4 Report Implications (Resource, Digital, Risk and Equalities) 
4.1 Resource 
Resource implications of implementing Internal Audit recommendations are
considered as part of the audit process to ensure these are reasonable and
proportionate to the risks. 
4.2 Digital 
There are no digital implications arising from this report. 
4.3 Risk 
The PSIAS require Internal Audit to evaluate the effectiveness of the Council’s
Risk Management arrangements and contribute to improvements in the
process. At the start of each audit engagement, to capture potential areas of
Page 225 of 260

Page 226

4
risk and uncertainty more fully, key stakeholders have been consulted and risk
registers have been considered. During each audit engagement the
management of risk has been tested. 
It is anticipated that improvements in the management and mitigation of risks
will arise as a direct result of Management implementing the Internal Audit
recommendations made. If audit recommendations are not implemented,
there is a greater risk of financial loss and/or reduced operational efficiency
and effectiveness, and Management may not be able to demonstrate
improvement in internal control and governance arrangements, and effective
management of risks. 
4.4 Ensuring Equalities 
This report does not relate to a new or revised policy, service or budget
change, which affects people (the public or staff), so an Integrated Impact
Assessment (IIA) is not an applicable consideration. 
The Internal Audit work is carried out in accordance with the appropriate
legislation and professional standards. The latter includes compliance by
those within the Internal Audit function with the Code of Ethics set out in the
PSIAS which is appropriate for the profession of Internal Audit founded as it is
on trust placed in its independent and objective assurance about risk
management, internal control and governance. 
4.5 Additional Report Implications (See Appendix A) 
Appendices 
Appendix 1 – Information Governance
Appendix 2 – Justice Services
Appendix 3 – Licensing
Appendix 4 – Purchase Cards
Appendix 5 – Council Tax Discounts and Exemptions 
Page 226 of 260

Page 227

5
APPENDIX A – Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Although this report does not relate directly to the key priorities within the
Single Midlothian Plan to which Midlothian Council and its Community
Planning Partners have made a commitment (Reducing the gap in economic
circumstances; Reducing the gap in learning outcomes; Reducing the gap in
health outcomes; and Reducing the impact of climate change), good
governance is important to enable Midlothian Council to deliver its key
priorities in support of achieving the Council’s objectives. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working  
Hub and Spoke  
Modern  
Sustainable  
Transformational  
Preventative  
Asset-based  
Continuous Improvement  
One size fits one 
None of the above 
Midlothian Council is committed to creating a great place to grow supported
by the 9 drivers for change. Implementing the 9 drivers for change in practice
is applicable to the Council’s Internal Audit service provision to assist the
Council in achieving its objectives. 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you  
Preventative and Sustainable  
Efficient and Modern  
Innovative and Ambitious 
A.4 Delivering Best Value 
The definition of Internal Auditing within the Public Sector Internal Audit
Standards (PSIAS) is “Internal auditing is an independent, objective
assurance and consulting activity designed to add value and improve an
organisation’s operations. It helps an organisation accomplish its objectives
Page 227 of 260

Page 228

6
by bringing a systematic, disciplined approach to evaluate and improve the
effectiveness of risk management, control and governance processes.” 
Implementation by Management of the actions associated with Internal Audit
recommendations, that are designed to improve internal control and
governance arrangements and management of risks, underpins the Council’s
own continuous improvement arrangements to enhance its effectiveness, thus
supporting the delivery of the Council’s best value duties. 
A.5 Involving Communities and Other Stakeholders 
The Chief Internal Auditor is accountable to the Audit Committee which, in
fulfilling its governance role, acts as a bridge between the Council and other
stakeholders. 
This report has been presented to the Corporate Management Team to
outline the key messages of assurance and areas of improvement. Senior
Management relevant to the areas audited have agreed the final Internal Audit
assurance reports as set out in the relevant Executive Summary within
Appendix 1. 
A.6 Impact on Performance and Outcomes 
The Findings and Recommendations from Internal Audit work during the year
are designed to assist the Council in improving its performance and
outcomes. 
A.7 Adopting a Preventative Approach 
Internal Audit assurance work includes assessments on when a preventative
approach can be adopted. 
A.8 Supporting Sustainable Development 
This report does not relate directly to supporting sustainable development.
Good governance is important to enable Midlothian Council to achieve its
objectives. 
Page 228 of 260

Page 229

APPENDIX 1 
Report Summary of key findings and recommendations Recommendations Status
H M L
Subject:  Information
Governance 
Category: Assurance –
Cyclical 
Date issued: 
26 May 2023 Draft 
16 August 2023 Final 
Level of Assurance: 
Satisfactory (Henderson
Loggie LLP completed
report equivalent to
Midlothian Council Audit
Substantial)
The EU General Data Protection Regulation (GDPR), which came into force on 25
May 2018 and was enshrined in law as part of the Data Protection Act 2018 (DPA
2018), included an expanded definition of what personal data was, a greater
number of specific responsibilities, and implemented significant fines for non-
compliance. The EU GDPR no longer applies in the UK after the end of the Brexit
transition period on 31 December 2020.  With effect from 1 January 2021, the
DPPEC (Data Protection, Privacy and Electronic Communications (Amendments
etc) (EU Exit)) Regulations 2019 amended the EU GDPR to form a new, UK
specific data protection regime that works in a UK context after Brexit to sit
alongside the DPA 2018.  This new regime is known as ‘the UK GDPR’.
Organisations are expected to control ever-increasing data volumes as
developments in information technology allow data to be efficiently collected,
stored and analysed. This elevates the risks within information management as the
scope for mismanagement increases with the volume of data.
Modern responses to information risk management include the incorporation of
information governance. Good information governance practices take into account
several considerations including: storage, communication & transference of
information, compliance with laws, training and performance reporting.
Storage, communication and transference of information should be supported by a
reliable IT infrastructure with developed cybersecurity enhancements. Although
ultimately solutions for information storage and communication is highly dependent
on organisational needs, nonetheless whether cloud or physical servers are used
these should be robust in order to avoid cybersecurity breaches. The storage of
both carbon copy and electronic information requires retention schedules to be
considered, often this in the form of a centralised list of data assets identifying how
long the data asset is kept and when they are expected to be destroyed. Retention
schedules are one of the requirements under UK GDPR as personal data is often
contained within information held by the organisation. 
Under UK GDPR organisations are required to provide data subjects access to
their personal data when a Subject Access Requests is made. This must be fulfilled
0 3 1 Management have
accepted the factual
accuracy of the
report and its
findings, and agreed
to implement the
recommendations.
Page 229 of 260

Page 230

Report Summary of key findings and recommendations Recommendations Status
H M L
within one calendar month of the request. Subject Access Requests (SARs) can be
resource intensive where multiple SARs are received. 
The Council has established a robust data protection compliance framework, which
includes a suite of policies, procedures, guidance, privacy notices, Information
Asset Registers (IARs), data breach and Subject Access Request reporting and
monitoring arrangements. A Data Protection Officer (DPO) is in place however the
function is undertaken on an interim basis by the Information Compliance Officer
who is a contractor with no access to contingency capability.
The Henderson Loggie Internal Audit report provided Satisfactory assurance over  
the adequacy and effectiveness of controls and processes for information
governance and the extent to which risks in this area are managed, specifically in
the following areas:   
• Policy and procedures;
• Roles and responsibilities;
• Information requests;
• Data processing;
• Information communication;
• Staff training; and 
• Management information and reporting.
The Internal Audit report on Information Governance made the following
recommendations:
• A timetable should be developed to formal review and update of IARs, DPIAs
and Privacy Notices within an achievable timescale. Suitably experienced
senior staff within each service area should review the completeness and
accuracy of information recorded in the IARs, DPIAs and Privacy Notices and
update this information as required. This process should be completed annually
and on completion each Executive Director should provide positive statement of
assurance to the DPO. (Medium)
• A review of the resources available for information governance should be
completed in order to provide assurance of appropriate resource coverage in
Page 230 of 260

Page 231

Report Summary of key findings and recommendations Recommendations Status
H M L
Data Protection and Records Management requirements across the Council.
(Medium)
• In line with the approach previously considered by the Council, the
establishment of a network of data protection champions should be considered
within each directorate to support the information management compliance
within services. Specific areas of responsibility for data champions should
include: 
➢ Maintaining the accuracy of IARs;
➢ Assisting with DPIAs and Privacy Notices and ensuring that they remain
current and up-to-date;
➢ Assisting in responding to SARs; 
➢ Reviewing compliance with retention schedules; and
➢ Providing service specific data protection updates to their relevant
teams.
A programme of suitable training should be developed to support data
champions to be effective in their roles (Medium)
• An annual Data Protection Compliance report should be developed and
formally reported to the CMT and Audit Committee. The report should include
relevant data protection progress updates, as well as summarising key
compliance metrics and trend analysis relating to data breaches, subject
access requests and completion rates for staff training. (Low) 
Page 231 of 260

Page 232

Page 232 of 260

Page 233

Report Summary of key findings and recommendations Recommendations Status
H M L
Subject:  Justice
Services 
Category: Assurance –
Cyclical 
Date issued: 
26 May 2023 Draft 
13 September 2023 Final 
Level of Assurance: 
Satisfactory (Henderson
Loggie LLP completed
report equivalent to
Midlothian Council Audit
Substantial)
Section 27 of the Social Work (Scotland) Act 1968 sets out requirements for a
function to be established within every Local Authority, under Part of the Act, to
provide supervision and care of persons put on probation or released from prison.
In summary, these requirements include availability of reports to any court,
children’s hearing (for person 16 and 17 years), procurator fiscal, or the Lord
Advocate relating to persons appearing before them. They must also provide
support and guidance to persons within the local authority immediately prior to their
imprisonment or detention or reside in the area after release from imprisonment or
detention.  At Midlothian Council, these services are delivered by its Justice
Services, led by its Chief Officer, Head of Adult Services, and Group Service
Manager for Justice Services. The team act in accordance with court orders
provided.
In addition, the Social Work Justice Services have responsibilities for supervising
Community Payback Orders (CPO) as set out in the CPO Practice Guidance (May
2022). Sections 227A to 227ZO, and Schedule 13 of the Criminal Procedure
(Scotland) Act 1995 ("the 1995 Act") provide the legislative framework for CPOs
and the role of Justice Services within Local Authorities.
Similarly, the MAPPA brings together the Police, Scottish Prison Service (SPS),
Health and the Local Authorities, in partnership as the Responsible Authorities, to
assess and manage the risk posed for certain categories of offender. Responsible
Authorities fulfil their statutory duties by jointly preparing and
publishing MAPPA annual reports. Local Authorities manage and supervise those
on the Sex Offender Register, however, can also supervise those not yet or
removed from the register depending on court orders.   
The framework, roles and responsibilities for Local Authority Social Work Services
in the Scottish Criminal Justice System are set out in the National Outcomes and
Standards for Social Work Services in the Criminal Justice System (August 2010).
There are three key outcomes for CJSW services: Community safety and public
protection; the reduction of re-offending; and social inclusion to support desistance
from offending.
0 1 4 Management have
accepted the factual
accuracy of the
report and its
findings, and agreed
to implement the 
recommendations.
Page 233 of 260

Page 234

Report Summary of key findings and recommendations Recommendations Status
H M L
Responsibility for devolved budgets within Justice Services are clearly defined
within documentation reviewed and are aligned with expected practice. High level
responsibilities for the Health and Social Care Partnership (HSCP) and its
Integration Joint Board (IJB) are set out in the Midlothian Integration Scheme
(March 2022). The IJB has delegated responsibility to contribute to the
achievement of national criminal outcome and the delivery of the Single Midlothian
Plan. The documented Justice Services Financial Process (May 2023) details
delegated authority for approving spend within the Justice Services team. Income
and expenditure is monitored locally by Justice Service management through
quarterly financial reports. Budget management is also reviewed by the Head of
Adult Services and the HSCP’s Chief Officer. Outcomes are monitored by the Chief
Social Work Officer (CSWO) to whom the Head of Adult Services deputises.
Executive management report to the Council and to the IJB. Commissioning
services are established to support delivery of the Justice Service Delivery Plan 
The Henderson Loggie Internal Audit report provided Good assurance that
• Responsibility for devolved budgets within Justice Services are clearly
defined and financial procedures are being followed in practice in controlling
income and expenditure;
• There is adequate reporting to Council committees around the work of
Justice Social Work Services; and
• There is adequate reporting to external bodies (such as the Scottish
Government and Midlothian IJB) around the work of Justice Social Work
Services (including reporting on unpaid work).
Satisfactory assurance that  Commissioning and monitoring arrangements for
commissioned services are being operated in line with the Council’s financial
procedures and that  Financial record keeping is sufficient to demonstrate that ring
fenced funding (such as COVID monies) have been spent in line with the
conditions attached to the funding, requires improvement. 
The Internal Audit report on Justice Services made the following recommendations:
Page 234 of 260

Page 235

Report Summary of key findings and recommendations Recommendations Status
H M L
• A process should be developed to update the public contract register on a
regular basis, specifically contract renewal details for Cyrenians should also be
updated on the public contract register. (Low)
• The framework agreements should be utilised to develop a joined up, cross
team procurement exercise where terms and conditions with Randstad are
refreshed and documented across HSCP teams to ensure value for money is
being achieved by all teams.(Low)
• Non purchase card holders who approve transactions on Integra should ensure
they are aware of their roles and responsibilities on the checks to be completed
during sign off on Integra and seek the training where there are gaps in their
understanding. (Low)
• Section 27 petty cash controls also require to be strengthened to ensure
alignment with Council requirements.  For example, management should
ensure:
➢ The use of disbursement logs,
➢ The frequency of reconciliation is in line with the Council’s risk appetite,
and 
➢ Line manager responsibilities for checks on balances and reconciliation
and top-up checks are completed and documented.
The risks to staff health and safety when transporting cash between the
Midlothian Council’s bank and the HSCP building require to be assessed. This
can be made on monetary value. Good practice would see two officers
transporting cash when it is of larger value.(Medium)
• Section 27 forms must be uploaded to service user accounts on Mosaic by the
Social Workers. Forms can be scanned onsite using printers or via cameras on
laptops.A timeline for the scanning and uploading of the backlog of Section 27
Forms onto Mosaic by Business Services should be provided. (Low)
Page 235 of 260

Page 236

Page 236 of 260

Page 237

Report Summary of key findings and recommendations Recommendations Status
H M L
Subject:  Licensing 
Category: Assurance –
Cyclical 
Date issued: 
19 July 2023 Draft 
6 September Final 
Level of Assurance: 
Substantial for the
processing of applications
and evidence compilation
and processes are in
place to receive licence
fee income at the
appropriate rate.  
Limited for the governance
arrangements in place to
support the licensing
activity and the ongoing
risk-based monitoring
arrangements.
The Midlothian Licensing Board are responsible for regulating the sale of alcohol
to the public (under The Licensing (Scotland) Act 2005) and certain gambling
activities (under The Gambling Act 2005).  The Council’s General Purposes
Committee is responsible for the issue of most other licences such as those
issued under the Civic Government (Scotland) Act 1982, the Housing (Scotland)
Act 2006 (houses of multiple occupancy), The Caravan Sites and Control of
Development Act 1960, and the various animal control licences.  The Civic
Government (Scotland) Act 1982 includes a wide range of activities such as taxi
and private hire vehicles, taxi and private hire drivers, skin piercing, tattooing,
second hand dealers, street traders, public entertainment, late hours catering,
window cleaners, metal dealers, knife dealers and indoor sports entertainment.
The Legal and Governance Manager acts as Clerk to the Licensing Board and
has authority delegated by the board to grant certain types of routine licences
where no objections have been received for the licence application.  Similarly, the
General Purposes Committee has granted delegated authority for other types of
licences to be approved by senior management where no objections have been
made.
The day-to-day management of the Licensing Team sits within Protective
Services under Health, Safety and Resilience.  This team has responsibility for
the administration of the majority of Civic Government (Scotland) Act 1982 and
Licensing (Scotland) Act 2005 Licences, including the processing of applications,
compilation and review of relevant evidence, coordination of responses from
consultees, preparation of evidence to submit to the relevant committee (if
required) and the issue of the approved licence to the applicant. Whilst Protective
Services have been responsible for some licences such as Animal Licensing and
Caravan licensing since the introduction of these licences, Civic Government
Licensing and Licensing Scotland Act 2005 Licences only recently became
Protective Services’ responsibility this year.  Protective Services have advised
that they will review and improve the Council’s licensing processes. The
administration of Animal licensing and Caravan licensing are managed by
Environmental Health Officers.  
0 1 13 Management have
accepted the factual
accuracy of the
report and its
findings, and agreed
to implement the
recommendations.
Page 237 of 260

Page 238

Report Summary of key findings and recommendations Recommendations Status
H M L
Short term lets licensing is also managed under Public Health and Environmental
Protection.  A system (ESB provided by Pentagull Ltd) was procured to support
the implementation of this new licence.  The short-term lets licensing scheme is
mandatory for all short-term let accommodation across Scotland.  The Civic
Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order 2021
requires that anyone operating a short-term let before 1 October 2022 must apply
for a licence by 1 October 2023 and those who want to set up and operate a
short-term let for the first time need a licence issued by their relevant Local
Authority before they take any bookings or accept any guests.
Licence fee income in 2022/23 was £92,974 for the Licensing Board, £96,111 for
Civic Licensing, and £5,423 for Animal Licensing.  There was no income for
Caravan Licensing in 2022/23 as the licence is for a 4 year period and was last
paid by all relevant licensees in 2019/20.  
Internal Audit considers that the level of assurance is substantial for the
processing of applications and evidence compilation and processes are in place
to receive licence fee income at the appropriate rate.  Assurance is limited for the
governance arrangements in place to support the licensing activity and the
ongoing risk-based monitoring arrangements.  Internal Audit made the following
recommendations:
• Licensing Board Committee papers should be published on the CMIS system
and the Functions Report and Income & Expenditure Statement should be
presented to the Board and published on the system. The statement should
accurately reflect costs relevant to the LSA 2015. (Low)
• Management should ensure the Licensing Forum is reconvened to ensure it is
fulfilling its statutory duties.  Consideration should be given as to how to
manage potential conflicts of interest in terms of Protective Services
management coordinating the Licensing Forum. (Low)
• An online public register for licences should be established. Management
should consider how the Idox Uniform system could be utilised to minimise
administration and duplication of effort for the development of the register.
(Low)
Page 238 of 260

Page 239

Report Summary of key findings and recommendations Recommendations Status
H M L
• There is a need to clarify some aspects of the roles and responsibilities for
Protective Services and the Clerk of the Licensing Board. (Low)
• Procedures should be developed for all licences issued by the Council and
risk registers should be updated. (Low)
• Licencing data should be reviewed to ensure it complies with the Council’s
retention policy. (Low)
• Application forms should be updated with the Council’s Privacy Policy and
should be available online for all licences. (Low)
• A consistent approach on when insurance is requested from applicants with
regard to Civic Government licensing and Animal Licensing should be
implemented and an audit trail of checks carried out for person fitness tests
and licensing inspections should be retained. (Low)
• The Topographical Test for taxi drivers should be reviewed and modernised
including the use of online training.  Fitness to Drive standards including the
requirement to submit medical examinations should be reviewed. (Low)
• Management should support the General Purposes Committee in considering
whether there is overprovision for taxi drivers and HMOs given the length of
time since this was last assessed.  Private Hire overprovision should also be
assessed as agreed by members of the General Purposes Committee in
February 2020. (Low)
• Management should review and update the Council’s Civic Government
licensing conditions and the Public Entertainment section 9 resolution. 
Appropriate periodic consultation should be established with relevant trades
such as taxi and private hire drivers. (Low)
• Animal Licencing fees should be reviewed to introduce a tiered approach
depending on the complexity of the business.  Caravan Licence Fees should
be reviewed and included on Midlothian’s Fees and Charges Schedule along
with all of the Council’s other Fees and Charges. (Low)
• Review hearings should be held at the Licensing Board for premises that have
not paid their renewal fees. (Low)
• The role of the Civic Licensing Standards Officer should be delivered and
adequate resource allocated to licensing monitoring and administrative
Page 239 of 260

Page 240

Report Summary of key findings and recommendations Recommendations Status
H M L
support.  The scheme of delegation should be updated to include the
Licensing Standards Officers for the Civic Government (Scotland) Act 1982
and the Licensing Scotland Act 2005. (Medium)
Page 240 of 260

Page 241

Report Summary of key findings and recommendations Recommendations Status
H M L
Subject:  Purchasing
Cards 
Category: Assurance –
Cyclical 
Date issued: 
31 May 2023 Draft 
18 August 2023 Final 
Level of Assurance: 
Satisfactory (Henderson
Loggie completed report
equivalent to Midlothian
Audit Substantial)
Midlothian Council’s purchasing cards are Mastercard charge cards supplied by the
Royal Bank of Scotland. They are used typically for the purchase of high volume,
low value goods and services facilitating less reliance on petty cash. Purchasing
cards have the benefit of providing a stronger audit trail and authorisation record
through integration with the Council’s finance system, Integra.
As at 17 May 2023, 368 purchasing cards were in use and for financial year
2022/23, a total of 19,405 transactions were made using purchasing cards, with a
value of £1.410 million in total expenditure.
The table below shows the split of Expenditure on the traditional plastic cards by
directorate during the 2022/23 financial year. 
Directorate No. of Cards No. of
Transactions
Total Value
Chief Executive  1 1 £480
People and
Partnerships
229 17,144 £1,157,504
Place 85 2,260 £252,405
Total 315 19,405 £1,410,389  
The Henderson Loggie Internal Audit report provided Good assurance that:    
• Adequate policies, procedures, and training are in place and have been
provided to all purchase card users;
• Purchasing cards are appropriately issued, controlled, and returned in line
with Council procedures; and  
• There is timely payment of the Council’s monthly purchasing card bills. 
0 0 4 Management have
accepted the factual
accuracy of the
report and its
findings, and agreed
to implement the 
recommendations.
Page 241 of 260

Page 242

Report Summary of key findings and recommendations Recommendations Status
H M L
The Henderson Loggie Internal Audit report provided Satisfactory assurance that:    
• Transactions are promptly verified on the system by the user with
associated proof of purchase documentation correctly attached
• Transactions are appropriately authorised in line with Council procedures
• There is ongoing monitoring of purchasing card spend throughout the year
to ensure that inappropriate expenditure is not incurred and that
expenditure is compliant with the Council’s policies and procedures
The Internal Audit report on Purchase Cards made the following recommendations:
• A reminder should be issued to current purchase cardholders and authorisers
to advise that purchases should be verified promptly, with adequate proof of
purchase attached and accurate VAT details recorded in Integra, to allow
authorisation within seven days in line with Council procedures. (Low)
• Business Applications staff should review the wording on the system generated
reminders to cardholders and authorisers when transactions remain
unauthorised to establish greater compliance with the authorisation processes.
(Low)
• A regular quarterly report to the CMT should be established including
information under each service management area the number of transactions
and value of expenditure through purchase cards that has no supporting
evidence or authorisation for review on an aged basis.  (Low)
• The Procurement team should periodically carry out an analysis of the
Council’s purchase card spend to identify opportunities for cost savings and to
confirm ongoing compliance with Procurement Procedures. (Low) 
Page 242 of 260

Page 243

Report Summary of key findings and recommendations Recommendations Status
H M L
Subject: Council Tax
Discounts and Exemptions 
Category: Assurance –
Cyclical 
Date issued: 
1 September 2023 Draft 
21 September 2023 Final 
Level of Assurance: 
Substantial for complying
with relevant legislation.
Limited for ensuring
adequate evidence is
obtained and adequate
investigations are undertaken
before discounts and
exemptions are awarded. 
The purpose of the audit was to evaluate the processes in place to ensure that the
Council is providing the appropriate Council Tax discounts and exemptions to
those households with an entitlement to these discounts and exemptions whilst
preventing any error or fraud.
Council Tax is a property based tax which contributes towards Council services.
Every property is banded (A-H) and each band is calculated as a proportion of
band D. The charge is based on two or more adult residents and discounts and
exemptions can be applied for single person households, disabled persons and
students as well as some other groups. A levy of 200% can be applied on Council
Tax charges for properties that meet the long term empty property criteria which
became effective from 1 April 2017.  Council Tax is administrated through the
Open Revenues system. Documentation is recorded on Digital 360 (D360). 
System calculations (billing parameters, discounts and exemptions) are tested
during the annual billing process (before bills are generated for the new tax year)
to ensure awards are calculated accurately. 
The Council collects water and waste charges on behalf of Scottish Water and
these charges are incorporated into the bills that are issued to customers.  As at
28 July 2023, there were 43,971 properties in Midlothian and 1,122 properties
were on the valuation exemption list. The annual charge billed for 2022/23 was
£72.886m (£54.881m Council Tax and £18.005m Water and Sewerage) and
£68.888m had been collected as at 31 March 2023. Total deductions of discounts
and exemptions awarded as at 12 May 2023 was 6.985m (10% of total amount
collected). As at 24 July 2023, there was a backlog of 3,912 Council tax cases
requiring action (for example assessment required due to a change of
circumstances). 
Internal Audit considers that the level of assurance is substantial for complying
with relevant legislation. Assurance is limited for ensuring adequate evidence is
obtained and adequate investigations are undertaken before discounts and
exemptions are awarded. 
Inadequate resource within the service, as a result of staff being reallocated to
process high volumes of Scottish Welfare Fund (SWF) applications, has resulted
1 2 3 Management have
accepted the factual
accuracy of the
report and its
findings, and agreed
to implement the
recommendations. 
Page 243 of 260

Page 244

in a backlog of cases (approx. 5 months), poor customer service, discounts and
exemptions not being reviewed, NFI data matches not being investigated and
inadequate quality checking of cases. Letters are issued annually for Single
Person discounts and the entitlement to the discount is removed for non-
responders.  Due to the lack of resource, this was not undertaken last year and
although letters were issued this year, reminder letters still need to be issued to
customers who have not responded.  This may have resulted in financial loss to
the Council. 
A business case for recruiting more staff to administer SWF applications was
approved by Council on 29 August 2023. The additional SWF resource will free up
existing Revenues Officers to return to processing Council Tax and benefits to
address the backlog.  Internal Audit made the following recommendations: 
• The Revenues Service should be appropriately resourced to enable: the single
person discount awards to be removed for non-responders; the periodic
checking of discounts and exemptions; the quality checking of cases to be
resumed; the investigation of NFI data matches; and the backlog of cases to
be cleared. (High)
• Management should review the current processes for awarding discounts and
exemptions and provide guidance to employees detailing the level of evidence
and investigation required.  Associated procedure notes should be
documented.  (Medium)
• Retention rules for the D360 system should be reviewed for Council Tax
records to ensure adequate evidence is retained for Council Tax accounts
which are still live. (Medium)
• Management should ensure that an employee declaration form is completed by
all Revenues employees on an annual basis and a record is retained of
employees’ / family accounts. (Low)
• The formal documentation delegating authority to modify different classes of
dwelling exempt from the additional Long Term Unoccupied Premium charge
requires to be updated to reflect the current service structure. (Low)
• The service risk register requires to be reviewed and updated. (Low)
Page 244 of 260

Page 245

Audit Committee 
Monday 30 October 2023
Item No 5.6   
Council House Building Programme - Progress Update 2023 
Report by Kevin Anderson, Executive Director, Place                           
Report for Information 
1 Recommendations 
Audit Committee is recommended to: 
a) Note the content of this report and the progress made on
Phases 2 to 5;
b) Note the sites now underway to complete Phase 4 and Phase 5,
projected handover programme and progress related to Open
Market Purchases; 
c) Note the potential Phase 5 sites currently under consideration to
progress; and
d) Note the projected costs/budget expenditure in this report. 
2 Purpose of Report  
Following presentation to Council on 10 October 2023, this report
updates the Audit Committee on the status of the overall housing
programme, on approved sites and proposed new sites for the Council
new build affordable housing programme and other initiatives. 
Date 29th September 2023 
Report Contact:
Name:  Greg Vettraino
Contact: greg.vettraino@midlothian.gov.uk 
Page 245 of 260

Page 246

3 Housing Building Programme and Planned Works  
3.1 Council Housing Programme – Phase 1 & 2 Sites 
Phase 1 provided 864 additional houses within Midlothian over a
period of 7 years with a total budget of £108,700,000 and is now
complete.   
Phase 2 targeted providing a further 412 additional homes within
Midlothian within a budget of £77,121,000 funded from the Housing
Revenue Capital Account enhanced with Scottish Government grant
funding. 489 homes were delivered under the Phase 2 budget by that
Phase’s conclusion. 
3.2 Council Housing Programme - Phases 3 & 4 combined 
Phase 3 & 4 funding combined comprises £166,258,000 (£42,208,000
for Phase 3 and £94,050,000 for Phase 4 plus further allocated funding
of £20,000,000 plus a further £10,000,000 approved at November
2022 Council). 
Due to actual costs being greater than initial estimates, driven by a
combination of war in Ukraine, EU exit and Covid-19 impacting on
building costs over recent years, the expected number of units to be
delivered for the Phase 3 & 4 budgets combined has reduced from 729
to 645 units as detailed in Table 1 below. 
Page 246 of 260

Page 247

Table 1: Phase 3 & 4 Sites reported to Council in 2022/2023 
Ref Location
2022
Position
Number
of
Homes
2023
Position 
C450 Buccleuch St (excludes Retail units),
Dalkeith 10 10
140 Dalhousie Mains - Springfield,
Bonnyrigg 70 70
151 Dandara, Shawfair 18 18
122 Former Co-op site, 83 High St,
Bonnyrigg 20  20
116 Newmills Road (former Dalkeith HS),
Dalkeith 92 92
131 Burnbrae Rd Hopefield – Co-op,
Hopefield 20 20
53 Morris Road, Newtongrange 79 79
149 Barratt, Millerhill/Shawfair (Barratt
withdrawal) 33 0
150 Barratt, Roslin Expansion 53 53
130 (1) Newbattle HS (Phase 1),
Newtongrange 90 90
C398/114 Dundas Highbank (Extra Care) St
Marys, Bonnyrigg 46 46
32/34 Newbyres, Gorebridge 75 75
109 Conifer Road, Mayfield 72 72
148 Newton Church Road, Danderhall
(moved to Phase 5) 23 0
142 Stewart Milne, Shawfair (moved to
Phase 5) 28 0 
All (Phase 3 & 4) Sites 729 645 
To date, phases 1-4 of Midlothian’s affordable housing programme has
delivered the following: 
Table 2: Delivery to date
Phase Homes
Phase 1 864
Phase 2 489
Phases 3&4 645
Total 1998 
Page 247 of 260

Page 248

3.3 Council Housing Programme - Phase 5 
Current approved budget for Phase 5 is £77.640 million however
projected budget variations on previous phases and an increase in the
Scottish Government Affordable Housing Supply Programme (AHSP)
Grant allocation means that there is potential for a further £5.791
million to be utilised for New Social Housing. 
Table 3: Phase 5 Sites   
Ref Location
Number
of
Homes
Cumulative
155 Crichton Rd Pathhead – SHIP Ref Muir
Group, South Tynewater: P41837 11 11
148 Danderhall, Newton Church Road
(former leisure centre): P43833 23 34
142 Edmonstone Road, Danderhall (Stewart
Milne): P43720 28 62
153 Newtongrange, former Church Hall Site:
P43742 6 68
159 Edinburgh Housing Demonstrator
Cluster: P43740 9 77
157 Rullion Road, Penicuik: P46386 48 125
158 Auchendinny, Bellway: P43835 71 196
156 Plot AA2/AA3, Newton Church Road,
Millerhill, Bellway 34 230
153 Newtongrange, Main Street, former
swimming pool  20 250
149 Plot R, Shawfair: was Barratt now Mac
and Mic: P42532 33 283
tbc Plot P,Shawfair, Persimmon Homes:
P43738 44 327  
All Phase 5 Sites TOTAL 327     
Town Centre Regeneration 
Midlothian Council are also developing plans for affordable housing at
the heart of town centre regeneration at Newtongrange village and
Dalkeith Town Centre. These plans are currently under development,
with design work underway for the former pool site at Newtongrange
and a Regeneration Development Framework produced for Dalkeith. 
The housing-led regeneration of Dalkeith is not able to call on the
General Fund for its delivery. Therefore, plans for housing in the town
centre cannot progress until a fully funded delivery plan for initial
phases of housing in the town centre is in place.   
Page 248 of 260

Page 249

Current Programme 
The current social housing programme for 2023 is tabled below: 
Table 4: 2023 Site Progress Update 
Ref Site Name Enabling
works
Main
Wks On
site
Hand
over
stage
Handed
over
32/34 Newbyres Crescent 75      
116 Newmills Road, Dalkeith     92  
140 Dalhousie Mains, Bonnyrigg       70
53 Morris Road, Newtongrange       79
109 Conifer Road, Mayfield   72    
117 Hopefield Yard, Bonnyrigg       16
122 High Street, Bonnyrigg   21    
130 Newbattle Phase 1   90    
131 Burnbrae, Hopefield     13 10
150 Barratt Homes, Moat View, Roslin   32   21
151 Dandara, Shawfair, Millerhill       18
C450 Buccleuch Street, Dalkeith     10  
142 Stewart Milne, Shawfair, Danderhall   28    
155 Muir Group, Pathhead   11    
C398 Polton Street (St Mary's)   46      
Totals 75 300 115 214  
Cumulative 75 375 490 704 
In summary: 
• 214 homes have already been handed over in 2023;
• 75 homes at Newbyres are at the enabling works stage with
grouting works and retaining wall works completed and market
prices being reviewed in October to progress to contract award;
• 300 homes are on site at various stages of construction; and
• A further 115 homes are on site but undergoing final snagging
and in the process of final handovers. 
Page 249 of 260

Page 250

Handover Programme 
Figure 1 below illustrates the programme of 272 handovers to tenants
based on current projected completions within the 2023 calendar year. 
Figure 1: Handover Programme     
At the Burnbrae site, the first phase of Passivhaus homes (10) have
been handed over on 13 Sep 2023 with the remainder expected to be
handed over in October. These are in the process of being allocated to
tenants. 
Buccleuch Street Passivhaus homes (10 or which 6 are built to
Passivhaus standard) are to be handed over in October. 
3.4 Routes to Development 
The sites confirmed as comprising Phase 5 (Table 3) can all be funded
through the HRA, following the approval of the Rent Review Strategy.
However their delivery is subject to availability of grant through the
Scottish Government’s Affordable Housing Supply Programme. 
There may be potential to bring more sites into Phase 5, however this
would only be if there is slippage in the programme from sites already
included. 
With regard to future potential sites, subject to securing further funding,
there are currently 4 known routes to potential development. 
Page 250 of 260

Page 251

Direct build on land already owned by Midlothian. 
Available Midlothian land suitable for social housing is now limited. 
Land that remains is often more difficult to develop in terms of site
abnormals and is often smaller in overall site size and number of units
with resultant loss of economies of scale. 
Available sites have recently been evaluated for potential inclusion in
the Edinburgh Home Demonstrator project procurement initiative (see
below). Whilst some sites have been eliminated as being unsuitable
others are being looked at for possible inclusion/ feasibility
assessment. 
To date 3 sites have been confirmed for development, all of which will
progress subject to planning and other statutory consents as well as
provision of grant funding from the Scottish Government.   
i. Newtongrange Church Hall site - Current proposal is 6 homes
(currently 5 approved in principle). This site is being considered
for offsite modular construction. 
ii. Eastfield Drive, Penicuik - Current proposal is 4 homes 
iii. Lyne Terrace, Penicuik - Current proposal is 7 homes (however
there remains some planning risk against this progressing) 
Housing Developer S75 affordable element 
The Council has the opportunity to secure affordable housing via a
planning obligation secured through Section 75 agreements with
developers, securing 25% of the total number of homes built as
affordable. As a means to procurement, the Council has the
opportunity to either:  
i. enter into land purchase/design & build contracts with these
developers or 
ii. purchase completed houses from these developers. 
Utilising support from legal and estates colleagues in either scenario
with developers has proven to work. 
House type and specification varies however between developers, and
each requires significant detailed review and discussion in order to
ensure these are acceptable to the Council. 
Developers are requested to adopt where possible design and
specification requirements aligning to those of the Council. There will
be instances where housing development team officers will have to
make concessions. For example, no developer to date has come
forward with the capability to build to Passivhaus standard. Council
officers have worked hard however to secure the best result possible in
terms of energy consumption and generally obtain energy performance
well in excess of the developer’s own private housing stock.   
Page 251 of 260

Page 252

Sites with Developers for completed home purchases (turnkey) or
Land Purchase/Building Design & Build Contracts are located in Table
5. 
Table 5: Homes deliver via Planning Obligations 
Midlothian Social Housing - Developer
affordable sites update    
Completed    
Ref Location
Number
of
Homes
Completed
119 Millers, Shawfair 23 2020
134 Barratts, Paradykes  Loanhead 21 Jan-21
144 Barratts, Roslyn 13 May-21
118 Bellway - Danderhall, Shawfair 47 Jan-22
146 Bellway - Wester Cowden,
Dalkeith 27 Jul-22
140 Springfield,Dalhousie Mains - 
Bonnyrigg 70 Nov-22
151 Dandara, Shawfair 18 Jul-23
On site      
Ref Location
Number
of
Homes
Handover
150 Barratt, Roslin Expansion 53 Jun - Nov 23
155 Muir Homes, Crichton Road,
Pathhead 12 Dec-24
142 Stewart Milne - Shawfair 28 Feb-25
Potential
future
sites      
Ref Location
Number
of
Homes
Handover
156 Bellway AA2/AA3 tbc tbc
157 Cala - Rullion Road - (Acquisition
only) tbc tbc  
Bellway Auchendinny tbc tbc  
Shawfair Plot R tbc tbc  
Springfield (ex Mac & Mic site) tbc tbc  
Persimmon Plot P tbc tbc 
Page 252 of 260

Page 253

Land acquisition and direct build 
Whilst this is an option, finding land available suitable for social
housing and affordable to the Council has become a rarity. 
Where developers have a land acquisition opportunity to satisfy their
Section 75 obligations in relation to affordable homes, this is actively
being explored. Land acquisition recently at Rullion Road, Penicuik
from CALA is an example of this scenario. 
There are currently no other sites currently under consideration by
Council officers however opportunities in the marketplace will be
actively explored if and when they arise. 
3.5 Edinburgh South East Scotland Home Demonstrator Programme 
The Council housing development team have expressed willingness
for Midlothian Council to be a South East (SE) Partner within the EHD
Programme (Pilot 3 element). 
It involves a collaborative procurement incorporating several local
authorities/RSLs across multiple sites for a feasibility commission
initially. This will be carried out utilising a common design team with
standardised house types developed to improve efficiencies in
production. 
The Collaborative Feasibility commission will provide a clear set of
deliverables for each site that will create the conditions for successful
delivery and bundling. 
The City of Edinburgh Council (CEC) have acted as Lead Authority to
procure the initial feasibility work for all sites. For the Pilot 3 phase,
actual project procurement and delivery of Midlothian EHD allocated
sites will be handled by Midlothian Council directly. To become cost
effective, off site construction benefits from sufficient volume to offset
initial factory tooling and set up costs. It is anticipated that the use of
standard design house types, developed through consultation with the
various participating authorities, will result in better economies of
scale. 
The intention is that all partners procure in the same manner. Part of
the model is to engage the offsite manufacturer early in the process
and the procurement will need to reflect that. 
3.6 Zero Carbon 
In compliance with the Council’s Climate Emergency Declaration,
officers developed a new Net Zero Housing Design Guide which
incorporates within its design brief the need to target a Zero Carbon
approach with an ambitious implementation plan and a requirement to
meet Passivhaus standards. Passivhaus is an internationally known
standard with exceptionally high energy efficiency working to achieve
buildings close to Zero Carbon and in turn address fuel poverty issue
(as heating demand is minimised) in a time of ever-increasing fuel bills. 
Page 253 of 260

Page 254

The Development Team has integrated Passivhaus into the social
housing procurement programme wherever possible. This has resulted
in Midlothian becoming one of the leading providers of new Passivhaus
social housing in Scotland. Passivhaus is a fully tried and tested
solution with guaranteed performance outcomes. 
The following Council projects currently under construction or which
will deliver Passivhaus homes are: 
Table 6: Midlothian Council Passivhaus Sites      
Ref Location
Number
of
Homes
Status
C450 Buccleuch St (excludes
refurbished homes), Dalkeith 6 Handover Oct
23
122 High Street, Bonnyrigg 20  On site 
131 Burnbrae Rd Hopefield – Co-op,
Hopefield 20
part handed
over – all by
Oct 23
130 (1) Newbattle HS (Phase 1),
Newtongrange 90
Enabling wks
complete –
award
imminent
C398/114 Dundas Highbank (Extra Care) St
Marys, Bonnyrigg 46
Enabling wks
complete –
award
imminent
148 Danderhall, Newton Church Road
(former leisure centre): P43833 23
Awaiting
Planning
Consent
116 Newmills Road, Dalkeith 2
On site –
handover
expected
Sep/Oct 23 
Total 207 
While comparator costs are set out in Table 7 below, the assessment
of the specific impact of building to a Passivhaus standard on cost is
difficult to ascertain because of the volatile market and high inflation on
projects from factors such as Covid-19, EU exit and the war in Ukraine,
which have all impacted the construction sector. A direct comparison is
not possible as elements such as site abnormals, which will also
impact on the overall development cost need to be extracted from the
tenders and any site infrastructure costs. 
Page 254 of 260

Page 255

Table 7: Development Costs – Passive & Non-Passive 
Site Projected
Number
of Units
Contract
Cost
Contract
Cost per
Unit
Projected
Dev Cost 
Cost
Per
Unit
Passivhaus Site          
Site 26 Buccleuch St 10       2,543,000   254,300  3,302,760 330,276
Site 122 Bonnyrigg
High Street (all 1
bedroom) 20       5,223,000   261,150  6,480,000 324,000
Site 130 Newbattle 90     25,867,000   287,411  30,731,000 341,456            
Non - Passivhaus Site          
Site 109 – Conifer
Road* 72     15,236,000   211,611  18,419,000 255,819
Site 116 - Newmills
Road 92     19,555,000   212,554  22,719,000 246,946
Site 117 - Cockpen
Terrace**  16       3,967,000   247,938  4,840,000 302,500
Site 53 Morris Road,
Newtongrange 79 11,685,000 147,911 14,448,000 182,886 
*Additional £350k cost expected 
**Cockpen Terrace was built to enhanced energy standards, triple glazing,
additional insulation, ASHP, a heat recovery system and multiple PV panels
that heat the hot water when there is a surplus of electricity generated by the
panels. 
To try and look at this in more detail two sites recently tendered by the
same contractor at Newbattle (Passivhaus specification) and Conifer
Road Mayfield (Building Regulations silver active standard) were
analysed by external cost consultants to try and determine the
difference in cost of construction between the two. Following this
detailed analysis, it was determined that there very little difference in
the tendered build costs between the Passivhaus and Non-
Passivhaus. This was deemed inconclusive however as the tenderer
subsequently withdrew from the Passivhaus tender process at
Newbattle, therefore a final price was not concluded. 
3.7 Grant Funding 
Officers continue to pursue available grant monies to assist in land
purchases/construction of Council housing in Midlothian.  More detail
on grant funding is available in Midlothian’s Strategic Housing
Investment Plan. Regular meetings with the Scottish Government are
undertaken to update programme and ensure spend is maximised. 
Page 255 of 260

Page 256

The Scottish Government have advised (August 2023) that the
2023/2024 funding requirement for the East of Scotland currently
stands at £16.428m however the approved budget at present is
£10.534m with the Council’s projected funding from that totalling
£10.044m. 
3.8 Open Market Purchases 
Midlothian Council has an Open Market Purchase Scheme whereby
ex-council properties are purchased on the open market and returned
to use as social rented housing stock. Midlothian Council receives
funding towards each Open Market Purchase from the Scottish
Government. Between 2017/18 and 2021/22, Midlothian Council
bought 98 properties from the open market. There have been 11
successful purchases in the current financial year to date with a target
of 26 by March 2023. 
4 Report Implications 
4.1 Resource 
All the costs of employing the necessary members of Housing
Development Team staff are included in the project budgets. 
Staff resourcing is continually being re-evaluated to ensure that
sufficient resources are in place to effectively manage this. Particular
emphasis has been placed on recruitment of additional site quality
control personnel to ensure build quality remains at the highest
standards. 
4.2 Risk 
The key programme risks for the affordable housing programme are: 
• Escalating costs due to inflation in the construction sector.
• Current unavailability of funding through the Housing Revenue
Account to support the extension of the programme beyond
Phase 5.
• Limited resources within the Development Team to support the
delivery of the programme and difficulties in recruitment.
• Potential risk to future funding from the Scottish Government. 
Funding 
Without further funding the Midlothian new social housing project
cannot progress beyond Phase 5. 
Recession impacting on developer sites. 
There has been a recent dip in house market sales in the private
sector which may cause Developers to rethink the viability of their sites
and may potentially put sites on hold. If so, potential Midlothian
Developer sites for Phase 5 may be at risk of being put on hold. 
Page 256 of 260

Page 257

Scottish Water Capacity issues 
Council officers continue to liaise with Scottish Water re future
potential Council housing developments and be considered for
inclusion in infrastructure capacity upgrades. 
Site availability 
Midlothian has exhausted the majority of available land that it owns,
and which is suitable for housing development.  Sites that remain are
generally those that had low viability/significant site abnormals. 
The potential remains for further sites to become available via Council
building closures. 
Covid-19 
Currently no significant risk to project delivery is being associated with
future Covid 19 outbreaks. This is being monitored however the
situation appears to have stabilised. 
EU exit 
Currently no significant risk to project delivery is being associated with
EU exit. The situation appears to have stabilised however it may still
be impacting on inflation. 
4.3 Single Midlothian Plan 
Themes addressed in this report: 
• Adult Health Care and Housing
• Sustainable Growth 
4.4 Impact on Performance and Outcomes 
The proposed works support the Council’s Local Housing Strategy and
accord with Midlothian Council’s Corporate Priorities. 
The Scottish Government requires all local authorities to prepare a
Strategic Housing Investment Plan (SHIP) that identifies the main
strategic investment priorities for affordable housing over a 5 year
period. This is required on an annual basis as the Scottish
Government requires detail on the Affordable Housing Supply
Programme in each regional area towards meeting the national target
of supporting new affordable homes. 
The SHIP sets out Midlothian Council’s approach to promoting
affordable housing investment and meeting housing supply targets
identified in the Housing Need and Demand Assessment for Edinburgh
and South East Scotland. 
The delivery of more affordable housing remains a high priority for
Midlothian Council. Despite significant investment in affordable
Page 257 of 260

Page 258

housing there is still a shortage of affordable housing in Midlothian with
4,468 households placed on the Council’s Housing List. 
4.5 Adopting a Preventative Approach 
Reviewing and utilising different procurement options in order to
promote early delivery.   
4.6 Involving Communities and Other Stakeholders 
Consultations internally and externally continue to be carried out with
all appropriate stakeholders ensuring input/comment on the proposed
layouts / house types and mix.  This will be undertaken for the
additional sites. 
4.7 Ensuring Equalities 
An Integrated Impact Assessment (IIA) has been undertaken on the
Local Housing Strategy 2021-26 to ensure that the needs of local
communities have been fully considered. The Strategic Housing
Investment Plan 2024/25 – 2028/29 reflects identified needs and
draws on findings from the IIA when considering the implications
flowing from the translation of strategic aims into housing policies. 
4.8 Supporting Sustainable Development 
The new build housing programme will comply with all current building
regulations and follows best practice in line with the Council’s policies
on the environment. 
In compliance with the Council’s Climate Emergency Declaration, the
design brief has been amended to assist in the move to a Zero Carbon
approach. We are currently pursuing a requirement to meet
Passivhaus standard, an international proven standard which achieves
low energy design through its fabric first approach. It also helps
address fuel poverty issues as heating demand is minimised, an
increasingly important factor with the move away from Natural Gas to
electric based heating systems.  All projected costs for future
developments accommodate the enhanced specification. 
The Council’s Climate Change Emergency provides that the Council
will aim to achieve Net Zero Carbon in all its activities by 2030. 
The RIBA have published target metrics for domestic buildings which
to achieve a 2030 Net Zero Challenge require that new domestic
dwellings achieve a target of between 0 and 35kWh/m2/yr. 
Passivhaus is a means of achieving this target however the
construction process itself produces Carbon (so called ‘embodied
carbon’). 
Officers are currently considering the implications of reducing
embodied carbon which if 2030 Net Zero Challenge is to be met will
require a target of less than 300KgCO2e/m2 (embodied carbon per
meter squared) to be achieved in construction. Initiatives such as the
Edinburgh Homes Demonstrator (EHD) Project previously mentioned,
Page 258 of 260

Page 259

and the adoption of Whole Life Carbon Analysis may provide the
means of achieving these goals. 
Fundamental to all new Passivhaus projects will be the need to
undertake Post Occupancy Evaluation (POE) surveys to assess how
effective projects are achieving these sustainability goals.   
Future involvement of Building Maintenance and other stakeholders in
all of these initiatives will be fundamental to their success and
developing the Council’s understanding of the implications of these
changes towards achieving Net Zero targets. 
4.9 Digital 
Building Information Modelling (BIM) is being utilised to deliver the
projects.  “Revit” models exist for the Council’s generic house types
and flat types which get updated to reflect new legislation and design
criteria. It is proposed that these models will be used for the
completion of all Phases (with the exception of some Developer
affordable sites where developer house types may have been adopted
to allow for inclusivity, or EHD sites) 
The adoption of 3d modelling will also have a key role in assessing the
sustainability of house designs and key construction approaches
particularly in respect avoiding ‘cold bridges’ which impact on thermal
effectiveness and also can be used to assess the embodied carbon
content of each element of the construction. 
Council officers have been equipped with homeworking IT capability to
enable them to continue to work in any changing work practice
situation. 
Site Quality Inspection staff have all been equipped with SurfacePro
tablets instead of laptops to allow them to have the ability to operate
these on site and view drawings and make comments on screen much
faster and easier. This will in turn provide more effective and efficient
delivery of the service. 
Page 259 of 260

Page 260

Page 260 of 260