Notice of Meeting and Agenda 
Audit Committee 
Venue:  Normandy Court/ Hybrid, 
Normandy Court, 20 Normandy Dr, Dalkeith, EH22 1JG 
Date:  Tuesday, 02 December 2025 
Time:  11:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone: 
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk 
Page 1 of 134

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item
and the nature of their interest. 
4          Minute of Previous Meeting
4.1 Minute of Audit Committee meeting of 30 September 2025
submitted for approval
3 - 14
4.2 Action Log 15 - 16 
5          Public Reports
5.1 Treasury Management Mid-Year Review Report, report by Chief
Financial Officer & Section 95 Officer
17 - 44
5.2 Internal Audit Work to November 2025, report by Chief Internal
Auditor
45 - 68
5.3 Follow-Up Review of Completed Internal Audit Recommendations
and Progress Update, report by Chief Internal Auditor
69 - 92
5.4 Strategic Risk Management – Strategic Risk Profile Quarter 2,
2025-26, report by Chief Officer Place
93 - 134 
6          Private Reports 
No items for discussion 
7          Date of Next Meeting 
The next meeting will be held on Monday 23 February 2026 at 11:00am. 
Page 2 of 134

Page 3

Audit Committee        
Tuesday 02 December 2025
Item No 4.1 
Audit Committee 
Date Time Venue
Tuesday 30 September 2025 11:00am Council Chambers/Hybrid 
Present: 
Councillor McEwan (Chair) Councillor Bowen (virtual)
Councillor McCall Councillor Milligan
Councillor Smaill   
In Attendance:
Councillor McKenzie (virtual)  Councillor Scott (virtual)
Dr Grace Vickers, Chief Executive  Kevin Anderson, Executive Director Place
Morag Barrow, Joint Director Health
and Social Care and Chief Officer to
Midlothian Integration Joint Board
David Gladwin, Chief Financial Officer &
Section 95 Officer 
Saty Kaur, Chief Officer Corporate
Solutions
Derek Oliver, Chief Officer Place
Duncan Stainbank, Chief Internal
Auditor
Alan Turpie, Legal and Governance
Manager and Monitoring Officer
Elaine Greaves, Principal Internal
Auditor 
Lisa Young, Accountant 
Claire Gardiner, Audit Director, Audit
Scotland
Patricia Fraser, Senior Audit Manager,
Audit Scotland
Hannah Forbes, Democratic Services
Officer
Nicola Thorburn, Democratic Services
Team Leader   
Page 3 of 134

Page 4

1. Welcome and Apologies for Absence 
The Chair welcomed everyone to the meeting of the Audit Committee. 
No apologies were received.
2. Order of Business 
The Order of Business is as per the agenda. 
3. Declarations of interest 
No declarations of interest were intimated at this stage of the proceedings. 
4. Minute of Previous Meeting
4.1 The Minutes of the previous meeting, held on 16 June 2025, were submitted for
approval. Councillor Smaill moved to approve the minutes, seconded by
Councillor Milligan.
4.2 Action Log – the Committee agreed that the item on the action log that has been
recommended for closure can be closed. 
5.      Public Reports 
Report No. Report Title Submitted by:
5.1 Audit Committee - Nomination of
Chair 
Chief Officer Corporate
Solutions
Outline of report and summary of discussion
The Chief Officer Corporate Solutions presented the report for decision, seeking
nomination of an Elected Member from the Audit Committee into the role of Chair
until the Local Government Elections in May 2027. 
Audit Committee is recommended to: 
• Nominate an Elected Member from the Audit Committee to the role of Chair
until the Local Government Elections in May 2027. 
Councillor Milligan nominated Councillor McEwan as the Chair of Audit Committee
until the Local Government Elections in May 2027, seconded by Councillor Smaill. 
Councillor Smaill asked about the recruitment of an Independent Chair for Audit
Committee.  The Chief Officer Corporate Solutions clarified that the Chair of Audit
Committee is now Councillor McEwan and that recruitment is ongoing for an
Independent Member for Audit Committee, not specifically an Independent Chair. 
The Chair thanked the Chief Officer Corporate Solutions for their report and the
Committee for their nomination.
Decision
Councillor Milligan nominated Councillor McEwan as the Chair of Audit Committee
until the Local Government Elections in May 2027, seconded by Councillor Smaill.
Page 4 of 134

Page 5

Report No. Report Title Submitted by:
5.2 Annual Audit Report to Members
and the Controller of Audit – year
ended 31 March 2025
Audit Scotland
Outline of report and summary of discussion
The Chair advised the Committee that they have asked Council Officers and Audit
Scotland to include dates on their reports alongside the quarters, so it is clear which
reporting period the information refers to. 
Councillor Milligan noted that they had only received the printed copies of agenda
items 5.2 and 5.3 shortly before this meeting started and therefore, they would not
participate in the discussion. The Chair noted that while the papers were available
online in sufficient time prior to the meeting, if required, Elected Members should
receive printed copies in advance of the meeting to allow time for reading.  It was
agreed that this matter would be taken away for review.   
The Audit Director, Audit Scotland presented their two reports, the first being the
Letter of Representations ISA (UK) 580 which provides conclusions on the financial
statement audit work.  The Audit Director, Audit Scotland confirmed that they intend
to issue an unmodified audit opinion which is the best result Audit Scotland give. 
Appendix B, a letter of representation, provides assurances from the Section 95
Officer on behalf of the Council on key judgements in the annual accounts.  This
includes fraud, and before approving this letter, the Audit Director, Audit Scotland
asked Audit Committee Members to consider if they have any knowledge of actual
fraud, non-compliance with law or regulations, or any issues that would prevent the
Section 95 Officer signing this letter.   
The Audit Director, Audit Scotland moved onto the annual audit report, which
confirms that the audit of Midlothian Council 2024/24 Annual Accounts resulted in
an unqualified opinion confirming the financial statements are free from material
misstatement.  The Audit Director, Audit Scotland added that while this reflects well
on the Council’s Finance Team and their preparation of the accounts the audit did
identify several valuation and classification issues relating to non-current assets,
these included misclassifications under  International Financial Reporting
Standards (IFRS)16 in relation to leases, errors in land and school valuations and
the use of outdated conditions surveys. Audit Scotland have outlined the
adjustments made to the accounts in appendix 2.  While none of the adjustments
were material individually, they do highlight areas for improvement particularly with
the valuation methodology, and recommendations have been raised.  The valuation
of Council dwellings was also reviewed and, while the methodology was found to
deviate from the Beacon method, Audit Scotland did confirm that the approach was
reasonable and there is a recommendation going forward to align more closely with
guidance in future valuations. 
In terms of the wider scope audit, the Audit Director, Audit Scotland highlighted that
the Council’s financial management arrangements are well established and
functioned effectively during the year.  However, the Audit Director, Audit Scotland
noted that there is a continued reliance on reserves which is unsustainable. The
Council ended the year with a £3 million overspend, driven by pressures in school
transport, staffing and waste disposal.  While capital spending was well managed,
the Audit Director, Audit Scotland noted that the Midlothian Integration Joint Board’s
Page 5 of 134

Page 6

(MIJB) Adult Social Care budget remains a significant risk, alongside other financial
challenges and Audit Scotland has concluded that Council must urgently identify
recurring savings to balance future budgets.  It was also concluded that governance
arrangements are sound, there is clear strategic vision with effective scrutiny, and
that the Council has appropriate frameworks for monitoring performance and
resource use. 
The Audit Director, Audit Scotland noted that Midlothian Council continue to
demonstrate a strong commitment to best value and governance arrangements are
effective.  Good progress has been made on previous recommendations.   
The Audit Director, Audit Scotland thanked Midlothian Council’s Finance Team for
their hard work in supporting this year’s audit. 
The Chair thanked the Senior Audit Manager, Audit Scotland for their report, their
work on the audit and then invited questions.   
Councillor Smaill advised that they found the report helpful and added that the Audit
Committee has confidence in the Council’s finance function and therefore has no
concerns over the adjustments that were required.   
Councillor Smaill referred to the valuation of Council houses and the adjustment
factor and highlighted that this had been discussed at length previously.  The Audit
Director, Audit Scotland advised that the guidance specifically states that rent yields
should be used to inform the adjustment factor and that the Valuer did do some
work on this in-year but felt that the local information available on rent yields was
not in-depth enough to inform a strong judgement.  If they used fewer local factors,
the adjustment factor would be out of line with rest of Scotland. The Audit Director,
Audit Scotland confirmed that while this was raised, they are comfortable with what
the Valuer has done to give a credible adjustment factor. The Chief Finance Officer
and Section 95 Officer added that discount factor is approximately 66% and that
the valuation of Council houses is a challenging piece of methodology and is
observed closely.   
Councillor Smaill asked if other Scottish Local Authorities were following a different
process, and whether using the Beacon methodology would be of benefit to the
Council.  The Audit Director, Audit Scotland clarified that in relation to the Beacon
principle, a Beacon property had not been selected from each area and instead
Midlothian Council had used a slightly different methodology, however Audit
Scotland has reviewed that, and it would not result in any material misstatement. 
The Chair referred to the testing on Council Tax – Secondary Checks, as detailed
on page 24 of the meeting papers and noted that Midlothian Council only identified
3 out of 10 however the Council procedures require at least 10 samples checks per
year of the exemptions, discounts, reductions and refunds applied to Council Tax. 
The Chief Officer Corporate Solutions advised that there have been resource
challenges in the Revenues Department over the last 12 months but gave
assurance that work is ongoing, within the transformation programme and in
general, to get the service performing well and that this target will be met next year. 
Page 6 of 134

Page 7

Decision
Audit Committee noted the contents of the report. 
Report No. Report Title Submitted by:
5.3 Annual Accounts for the year ended
31 March 2025 
Chief Financial 
Officer and Section 95 
Officer
Outline of report and summary of discussion
The Chief Financial Officer and Section 95 Officer presented the report for decision, 
presenting the Council’s audited annual accounts for 2024/25 to Audit Committee
and provided a brief overview of findings during the audit process. 
Audit Committee is recommended to approve the 2024/25 audited annual accounts
for signature in light of the appointed auditor’s report for 2024/25. 
The Chief Financial Officer and Section 95 Officer added that due to the necessary
technical aspects of local government accounts, this will always be a challenging
area for Elected Members serving the Audit Committee. To support Audit
Committee Members and their governance requirements reliance can be placed on
the findings of the Council’s appointed auditor, Audit Scotland, and the Chief
Financial Officer and Section 95 Officer.  During the last three months Audit
Scotland have carried out extensive work on the accounts, and the findings were
discussed earlier in today’s meeting. Audit Scotland have issued an unmodified
opinion. 
The Chief Financial Officer and Section 95 Officer noted that the Council have a
very strong working relationship with Audit Scotland in what is a very challenging
area to navigate. The Chief Financial Officer and Section 95 Officer thanked the
Audit Director, Audit Scotland and their team for fostering this. 
Since these meeting papers were issued, the Chief Financial Officer and Section
95 Officer advised that there have been some minor adjustments which were all
minimal and presentational in nature. The audited accounts that should be signed,
if Audit Committee approve today, will reflect these adjustments. 
The Chief Financial Officer and Section 95 Officer applauded the tireless dedication
of their team and gave their personal thanks. The Chair echoed these sentiments
and thanked the Chief Financial Officer and Section 95 Officer and their team. 
The Chair thanked the Chief Financial Officer and Section 95 Officer for the report
and invited questions. 
Councillor Smaill thanked the Chief Financial Officer and Section 95 Officer for the
accounts and noted that they were very accessible. Councillor Smaill highlighted
some minor presentational issues. The Chief Finance Officer and Section 95 Officer
thanked Councillor Smaill for their feedback, acknowledged where the narrative
could be expanded and agreed to take that on board for next year’s report. 
Councillor Smaill congratulated the Chief Financial Officer and Section 95 Officer
Page 7 of 134

Page 8

on being the first Midlothian Council Chief Financial Officer and Section 95 Officer
where the assets exceed £1 billion.   
The report was moved by Councillor McCall and seconded by Councillor Smaill.
Decision
Audit Committee approved the report and the recommendations. 
Report No. Report Title Submitted by:
5.4 Internal Audit Work to September 2025  Chief Internal
Auditor
Outline of report and summary of discussion
The Chief Internal Auditor presented the report for decision, providing the Audit
Committee with details of the recent work carried out by Internal Audit and the
findings and recommended audit actions agreed by Management to improve
internal controls and governance arrangements. 
The Internal Audit Annual Plan 2025/26 was approved by the Audit Committee on
24 February 2025. Internal Audit has carried out work associated with the delivery
of the plan to meet its objective of providing an opinion on the efficacy of the
Council’s risk management, internal control and governance. 
An Executive Summary of the final Internal Audit assurance report issued, including
audit objective, findings, good practice and recommendations (where appropriate),
and the Chief Internal Auditor’s independent and objective opinion on the adequacy
of the control environment and governance arrangements within each audit area,
is shown in Appendix 1. 
The Internal Audit function conforms to the professional standards as set out in
Global Internal Audit Standards (GIAS) including the production of this report to
communicate the results of the reviews. 
The Audit Committee is recommended to: 
a) Consider the Executive Summary of the final Internal Audit assurance report
issued associated with the delivery of the approved Internal Audit Annual
Plan 2025/26; 
b) Note the Internal Audit Consultancy and Other Work carried out in
accordance with the approved Internal audit Charter; and 
c) Acknowledge the assurance provided on internal controls and governance
arrangements in place for the areas covered by this Internal Audit work. 
The Chair thanked the Chief Internal Auditor for the report and invited questions. 
Page 8 of 134

Page 9

Councillor Smaill asked about the IR35 position and the financial implications with
His Majesty’s Revenues and Customs (HMRC) in relation to national insurance and
income tax for agency workers that stay with the Council too long. The Chief
Internal Auditor advised that long-term agency staff must be looked at on an
individual basis. The Chief Officer Corporate Solutions assured Members that in
terms of the IR35, HMRC conducted an audit of IR35 workers in the organisation
in 2022/23 and they did not find any issues or irregularities.  The process that
requires to be updated inside the organisation is the review of how long agency
workers are being used, which is a reviewed on a case-by-case basis within each
service.  The Chair asked if the Council enter into fixed term contracts with agencies
on behalf of the agency worker. The Chief Officer Corporate Solutions advised that
this was dependent upon the situation, for example business transformation
projects with agreed funding have Project Managers who are brought in on a fixed-
term contract.  There are other areas, as detailed in the report, where there are
challenges in recruitment, so agency workers are used to fill some of the gaps, but
they should all be aligned to a specific project or piece of work.  Councillor Milligan
asked why the Recruitment and Selection Policy had not been updated since 2012
and advised that they expected this to have been reviewed during the COVID
period.  The Chief Office Corporate Solutions agreed that there should have been
a robust process in place for reviewing this policy and there is now a policy register
for  the organisation and a red/amber/green (RAG) system in place for review. 
Work is ongoing to ensure this is aligned to onboarding, hybrid working, and the
recruitment policy. The Chief Office Corporate Solutions expects that the policy will
be in place by the end of December 2025. 
Councillor Milligan highlighted that the papers indicate that £3million of the spend
on agency staff are to suppliers who are not approved in the Public Sector
Framework, and that this will not be resolved until September 2026.  Councillor
Milligan asked if this could be resolved sooner, perhaps by the end of the financial
year.  Councillor Milligan also expressed concerns as the report states that clear
written principles had not been established for managers to follow when a level 1
disclosure check is required, and that the guidance will not be ready until March
2026.  The Chief Officer Corporate Solutions advised that ideally these tasks will
be completed sooner but they have given the timeline of 1 year as this will involve
reviews on a case-by-case basis, time to gain an understanding of the agency use
within each service, and why some are not using the approved agencies on the
Public Sector Framework.  Support can then be provided through the procurement
process if required.  The Chief Officer Corporate Solutions has requested a
breakdown of the figures which will show agency worker use across all the services.
The Chair asked for clarification on whether the disclosures referred to agency staff
only, and not permanent employees.  The Chief Officer Corporate Solutions
responded that this will be different across the services.  The Chair asked whether
the onus should be on the agencies to ensure the staff they provide have the
necessary certification for employability. The Chief Officer Corporate Solutions
advised that the contracts between Midlothian Council and the agency provider
must be reviewed to confirm the position. 
Page 9 of 134

Page 10

Councillor Smaill asked if this work will be linked to the Council’s policy where our
contractors, including agency workers, are paid the living wage and how this
monitored. The Chief Officer Corporate Solutions advised that work is ongoing
around “fair work” and a paper was taken to Council in 2024. There is a significant
piece of work to be done in and around commissioned services and any
organisations that the Council fund and if they pay the living wage. With the
Council’s agency workers, we would not employ an agency worker that is paid less
that the equivalent permanent role in the Council.  Council staff are being paid the
real living wage and above. 
The report was moved by Councillor Smaill and seconded by Councillor McCall.
Decision
Audit Committee approved the report and the recommendations. 
Report No. Report Title Submitted by:
5.5  Audit Committee Annual / End of Term
Report 2024/25 
Chair 
Outline of report and summary of discussion
The Chief Internal Auditor presented the report for decision, providing Members with
the Audit Committee Annual / End of Term Report 2024/25, which sets out how the
Audit Committee has performed against its remit and the effectiveness of the Audit
Committee in meeting its purpose based on the annual self-assessments of the
Committee against best practice and provides assurances to the Council. 
It is important that the Council’s Audit Committee fully complies with best practice
guidance on Audit Committees to ensure it can demonstrate its effectiveness as a
scrutiny body as a foundation for sound corporate governance of the Council.
The Chartered Institute of Public Finance and Accountancy (CIPFA) Audit
Committees Practical Guidance for Local Authorities and Police 2022 Edition
(hereinafter referred to as CIPFA Audit Committees Guidance) includes the
production of an annual report on the performance of the Audit Committee for
submission to the Council. The Audit Committee Annual / End of Term Report
2024/25 is appended to this report as Appendix 1 for consideration. 
The Audit Committee is recommended to approve the Audit Committee Annual /End
of Term Report 2024/25 (Appendix 1) and its self-assessments using the CIPFA
Audit Committees Guidance (Appendices 2 and 3) and agrees that the Audit
Committee Annual / End of Term Report 2024/25 should be presented to the
Council. 
The Chair thanked the Chief Internal Auditor for the report and invited questions. 
No questions were submitted. 
The report was moved by Councillor Smaill and seconded by Councillor McCall.
Decision
Audit Committee approved the report and the recommendations. 
Page 10 of 134

Page 11

Report No. Report Title Submitted by:
5.6 Risk Management Policy and Strategy  Chief Officer Place
Outline of report and summary of discussion
The Chief Officer Place presented the report for decision, showing the revised Risk
Management Policy and Strategy, which outlines the proposed approach to risk
management and governance arrangements for risk monitoring and accountability. 
Audit Committee is recommended to approve the revised Risk Management Policy
and Strategy. 
The Chair thanked the Chief Officer Place for their report and invited questions. 
Councillor Milligan highlighted the strategic risk evaluation for Care at Home on
page 89 of the meeting papers, and asked whether a likelihood rating of 3, and the
impact being 4, are suitable ratings given the criticality of this service and the
significant rise in demand. The Chief Officer Place advised that those ratings relate
to the Strategic Risk Profile and would be covered as part of agenda item 5.7
Strategic Risk Management – Strategic Risk Profile Quarter 1, 2025-26. 
The report was moved by Councillor Smaill and seconded by Councillor McCall.
Decision
Audit Committee approved the report and the recommendations. 
Report No. Report Title Submitted by:
5.7 Strategic Risk Management – Strategic
Risk Profile Quarter 1, 2025-26 
Chief Officer Place
Outline of report and summary of discussion
The Chief Officer Place presented the report for information, providing Audit
Committee with: - 
• An update on the risk responses Midlothian Council has implemented during
Q1 2025/26 to respond to the current risk climate.
• Assurance that Midlothian Council took a proportionate and planned
approach to prepare and respond to the current risk climate.
• The risk evaluation of current strategic risks and opportunities for the
Council. 
Audit Committee is recommended to note the current risk landscape and
organisational response to the most significant risks in Quarter 1, 2025-26 (1st April
to 30th June 2025). 
The Chair thanked the Chief Officer Place for their report and invited questions.   
The Joint Director Health and Social Care and Chief Officer to Midlothian
Integration Joint Board addressed Councillor Milligan’s previous question regarding
Page 11 of 134

Page 12

the Care at Home rating and advised that financially they have allocated
additionality through the NHS Unscheduled Care Funding hence this service’s risk
rating has not increased at this point in time.  The Joint Director Health and Social
Care and Chief Officer to Midlothian Integration Joint Board agreed to discuss this
specific risk rating with their team and revert. 
Councillor McCall asked about cyber security after seeing notable differences in
the number of spam emails that they receive in their other role working for a
Member of the Scottish Parliament (MSP) in comparison to what they receive at
the Council.   
The Chief Officer Place advised that through the Risk and Resiliency Group and
the Business Continuity Planning Midlothian Council does have an enhanced level
of cyber security. 
The Chief Officer Corporate Solutions added that in terms of cyber security
everyone should be mindful that it is a case of when, not if, the Council may be
subject to a cyber event. The meeting papers detail some of the appropriate
organisational and technical measures taken. Midlothian Council systems are
subject to rigorous checks and protocols are in place. The Chief Internal Audit
added that their team plan to undertake some work on cyber security to ensure
Midlothian Council have everything possible in place. 
Councillor Smaill asked Audit Scotland if there were any methodologies to support
the management of capital plan finances as these are challenging to confirm.  The
Chair asked if the Capital Plan was putting Midlothian Council at too great a risk. 
The Chief Internal Auditor deferred the question to the Executive Director Place
and added that they were open to discussing this further offline to determine where
their team could assist. The Executive Director Place advised that there is an
existing Capital Plan for the current financial year, which was established in
February 2025, and delivery is in progress with regular reporting to the Elected
Members.  In terms of future years, work is ongoing using Artificial Intelligence (A.I)
to have a significant piece of data processing carried out, and the aim is to take a
draft paper to the October meeting of Midlothian Council on the Asset Management
Plan.  The Audit Director, Audit Scotland highlighted that the Year 4 Audit Scotland
Best Value Thematic work will be focused on asset management so examples of
good practice can be shared then. The Chief Finance Officer and Section 95 Officer
reminded the Audit Committee that the affordability of capital plans is measured by
the Prudential Framework, and those indicators are reported to Council regularly.
When Capital Plan prioritisation was first discussed it was understood that due to
the infrastructure pressures in Midlothian there was a significant risk of not being
able to deliver those pressures and operate within budget.  The Chief Finance
Officer and Section 95 Officer explained that when budgets are set for future years,
both the Housing Revenue Account Budget and the General Fund, the cost of
borrowing and running the premises that are created or developed as part of the
Capital Plan are reflected in the budget.  The challenge now is to ensure future
challenges, and the delivery of the existing Capital Plan is accurately reflected
going forward. 
Page 12 of 134

Page 13

Councillor Milligan added that the Capital Plan was still lacking information, and
that Elected Members must have a clearer picture to show the prioritisation of
capital projects. In terms of cyber security, Councillor Milligan asked when
information is gathered after an attack on organisations and whether that
information is shared widely to support learning. The Chief Internal Auditor advised
that there are public sector networks locally and nationally where information is
shared for learning.  The Chief Internal Auditor added that any organisation is only
as strong as their weakest link, and often that is the human element of any process. 
The Chief Officer Corporate Solutions advised that they are part of groups that link
in together during the recovery phase of a cyber-attack and will be attending an
upcoming session to work through potential scenarios.  Controls and processes are
under constant review and there are regular staff communications with reminders
around the risks. 
The Audit Director, Audit Scotland emphasised that a cyber-attack on a local
authority would be catastrophic. 
Councillor Smaill noted that the information on page 115 of the meeting papers,
Cost of Living Crisis, relates to 2022 and added that this should be updated given
the significant changes since then in terms of support and benefits available now. 
Decision
Audit Committee noted the contents of the report. 
Action
Review the Strategic Risk Ratings assigned to Care at Home and provide an
update - Joint Director Health and Social Care and Chief Officer to Midlothian
Integration Joint Board. 
Review SRP.RR.22 Cost of Living Crisis and update with current data following
changes in the support and benefits available since 2022 – Chief Officer Place. 
6. Private Reports 
No items for discussion. 
7. Any Other Business 
The Chair updated Audit Committee regarding concerns raised previously on Home
to School Transport overspend. The Chair has discussed this with the Chief Internal
Auditor, and this is still being reviewed. The Chief Internal Auditor confirmed that the
report has been submitted to management for review, and they hope to get the full
report shared with Elected Members and Audit Committee as soon as possible.  The
Chair asked that the Chief Internal Auditor provide paper copies of the report to Elected
Members. 
Page 13 of 134

Page 14

8. Date of Next Meeting 
The meeting concluded at 12:13pm. 
The next meeting of the Audit Committee will be held on Tuesday 02 December 2025
at 11:00am.
Page 14 of 134

Page 15

Audit Committee               
Tuesday 2 December 2025
Item 4.2
Audit Committee Action Log 
No Date of
Meeting
Item No and Title Action Action Owner Expected
completion
date
Comments
1 30 September
2025
5.7 Strategic Risk Management –
Strategic Risk Profile Quarter 1,
2025-26
Review the Strategic Risk
Ratings assigned to Care at
Home and provide an update.
Joint Director Health and
Social Care and Chief
Officer to Midlothian
Integration Joint Board
TBC 
2 30 September
2025
5.7 Strategic Risk Management –
Strategic Risk Profile Quarter 1,
2025-26
Review SRP.RR.22 Cost of
Living Crisis and update with
current data following changes
in the support and benefits
available since 2022.
Chief Officer Place TBC 
Page 15 of 134

Page 16

Page 16 of 134

Page 17

Audit Committee
Tuesday 2 December 2025
Item No 5.1  
Treasury Management Mid-Year Review Report 2025/26 
Report by David Gladwin, Chief Financial Officer & Section 95 Officer 
Report for Consideration 
1 Recommendations 
The Audit Committee is invited to comment on this report before it is
presented to Council.  In particular, Audit Committee should note the
following recommendations which are proposed to be put to Council on
16 December 2025:- 
a) Note the report and the treasury activity undertaken in the period
to 20 November 2025, as outlined in Section 4 and Section 5.2;
b) Note the current economic position and forecast for interest
rates, and the actual and forecast Treasury Management activity
during the second-half of the year as outlined in Section 5.2 and
5.3; and note the continuation of a Treasury Management
strategy of minimising cash (fixed term deposit) balances to
allow the Council to continue to defer costs associated with
locking into longer-term borrowing at rates that remain elevated,
noting that this strategy is similar to the majority of other Scottish
Councils;
c) Note the technical revisions to the Prudential Indicators in
Section 6 of this report;
d) Note the loans fund rate performance relative to other Scottish
Local authorities, as outlined in Section 7, and the cash saving
(compared to the Scottish Average) that the Treasury
Management function brings to support the Council’s in-year
revenue budget. 
2 Purpose of Report/Executive Summary 
The purpose of this report is to inform members of the Audit Committee,
and subsequently Council, of the Treasury Management activity
undertaken during the first half of 2025/26 and the forecast activity for
the second half of 2025/26 in accordance with the Treasury
Management and Annual Investment Strategy approved by Council on
25 February 2025.  It also provides an update to the Treasury and
Prudential Indicators for 2025/26. 
Date: 20 November 2025
Report Contact:
Gary Thomson, Senior Finance Business Partner
gary.thomson@midlothian.gov.uk 
Page 17 of 134

Page 18

3 Background 
Audit Committee Role 
The Prudential Code recommends that the main Treasury Management
reports are presented for scrutiny by Audit Committee in advance of
consideration by Council.  This report is being presented to Audit
Committee on 2 December 2025 for consideration prior to being
presented to Council on 16 December 2025.  Any revisions arising from
Audit Committee consideration of the report on 2 December 2025 will be
incorporated into the final version of the report to Council on 16
December 2025. 
Treasury management 
Treasury management is defined in the Prudential Code as: 
“The management of the local authority’s borrowing, investments and
cash flows, its banking, money market and capital market transactions;
the effective control of the risks associated with those activities; and the
pursuit of optimum performance consistent with those risks.” 
The main function of the treasury management service is the funding of
the Council’s capital investment plans.  These capital plans provide a
guide to the borrowing need of the Council, essentially the longer-term
cash flow planning to ensure the Council can meet its capital spending
operations.  The management of this long-term borrowing requirement
involves arranging long or short-term loans or using cash balances; and
on occasion any debt previously drawn may be restructured to meet
Council risk or cost objectives. 
As the Council operates a balanced budget, this broadly means cash
raised during the year will meet its cash expenditure.  As part of the
treasury management operations, officers ensure this cash flow is
adequately planned, with available cash balances being deposited in
low-risk counterparties, providing adequate liquidity initially before
considering optimising return on deposits. 
This mid-year report has been prepared in compliance with CIPFA’s
Code of Practice on Treasury Management, and covers the following: 
• An economic update for the first half of the 2025/26 financial year;
• A review of the Treasury Management Strategy Statement and
Annual Investment Strategy 2025/26 (TM&AIS 2025/26) approved by
Council on 25 February 2025;
• The Council’s capital expenditure, as set out in the General Services
and HRA Capital Plan reports, and prudential indicators;
• A review of the Council’s borrowing strategy for 2025/26;
• A review of the Council’s deposit portfolio for 2025/26;
• A review of debt rescheduling undertaken during 2025/26;
• A review of compliance with Treasury and Prudential Limits for
2025/26. 
Page 18 of 134

Page 19

4 Treasury Activity during first half of 2025/26 
The main points arising from treasury activity in the 6 months to 30
September 2025 were:- 
• Long term borrowing of £40.000 million was secured in April 2025,
this being:- 
o Two £10 million PWLB Maturity loans with tenors of 3 and
4 years respectively and at interest rates of 4.16% and
4.18% respectively.
o Two £10 million PWLB Equal Instalment of Principle (EIP)
loans with tenors of 6 and 8 years respectively and at
interest rates of 4.18% and 4.20% respectively. 
• Long term borrowing of £0.870 million matured, this being
£0.500m of PWLB EIP loans, £0.340 million of Market Loans and
£0.031 million PWLB Annuities; 
• A fixed term deposit of £10.000 million was placed with Lloyds
Banking Group in April 2025, with a tenor of 1 year and earning
an interest rate of 4.18%; 
• The average interest rate earned on external funds on deposit in
the first half of the year was 4.24%. 
Loan Portfolio 
The Council’s loan portfolio as at 30 September 2025 is shown in table 1
below (position at 31 March 2025 also shown for comparison):- 
Table 1: Council’s Loan Portfolio at 31 March 2025 and 30 September
2025. 
Loan Type
31 March 2025 30 September 2025
Principal
Outstanding
£000’s
Weighted
Average
Rate
Principal
Outstanding
£000’s
Weighted
Average
Rate %
PWLB Annuity 395 8.92% 365 8.92%
PWLB Maturity 333,502 3.11% 353,502 3.17%
PWLB EIP 10,000 4.49% 29,500 4.29%
LOBO 15,000 4.63% 15,000 4.63%
Market Loans 20,548 3.04% 20,208 3.04%
Total Loans 379,445 3.21% 418,575 3.30%     
Underlying Borrowing Requirement* 469,866  427,696 
Over/(Under) Borrowing -90,421  -67,884 
* The Underlying Borrowing Requirement is the Capital Financing
Requirement excluding the “Public Private Finance” (PPP) Contract
Liabilities 
Page 19 of 134

Page 20

The balance of external and internal borrowing is generally driven by
market conditions. 
At 30 September 2025 the Council was under borrowed by £67.884
million – this is the extent to which the Council has yet to finance its
current borrowing requirement from long term loans.  This position
reflects the Council’s use of working capital and balance sheet useable
reserves to fund part of the prior year and current in-year borrowing
requirement. 
This strategy of using internal borrowing (working capital) to fund the in-
year CFR is prudent given the current plateau in medium to longer-term
PWLB borrowing rates of c. 5.50%+ together with the expected gradual
drop in these medium to longer-term PWLB borrowing rates over the
remainder of the current and forthcoming financial years as outlined in
Appendix 4. 
Debt Rescheduling 
No Debt Rescheduling took place in the first half of the financial year. 
Funds on Deposit 
The Council’s funds on deposit portfolio as at 30 September 2025 is
shown in table 2 below (position at 31 March 2025 also shown for
comparison):- 
Table 2: Council’s Funds on Deposit Portfolio at 31 March 2025 and 30
September 2025 
Type
31 March 2025 30 September 2025
Principal
Outstanding
£000’s
Weighted
Average
Rate
Principal
Outstanding
£000’s
Weighted
Average
Rate %
Money Market Funds 25,946 4.54% 29,667 4.09%
Bank Call Accounts 538 4.34% 243 3.77%
Bank Fixed Term Deposits 0 n/a 10,000 4.18%
Total Deposits 26,484 4.54% 39,910 4.11% 
The Chief Financial Officer & Section 95 Officer confirms that the
approved limits within the Annual Investment Strategy were not
breached during the first 6 months of 2025/26.  
Page 20 of 134

Page 21

5 Actual/Expected Treasury Activity during second half of 2025/26 
5.1 Economic Update 
The Council has appointed MUFG Corporate Markets (formerly Link
Treasury Solutions Limited) as its treasury advisors and part of their
service is to assist the Council to formulate a view on interest rates. 
These are outlined in Table 3 below. 
Table 3: MUFG Corporate Markets Central Forecast for Interest Rates 
In summary, interest rates for borrowing across the entire Gilt Yield
curve have shifted higher and are expected to remain elevated for
longer, particularly at the medium-longer end of the curve.  This reflects
ongoing concerns around the stickiness of inflation, elevated wages and
the difficult funding choices facing the Chancellor in the upcoming
Budget on 26 November 2025; although international factors emanating
from the Trump administration’s fiscal, tariff and geo-political policies
continue to play a significant role in market expectations. 
The Bank of England announced in September that it would be favouring
the short and medium part of the curve for the foreseeable future when
issuing gilts, but market reaction to the November Budget is likely to be
the decisive factor in future gilt market attractiveness to investors and
their willingness to buy UK sovereign debt. 
The Bank of England Base Rate remains at 4.00%, with (a) inflation not
anticipated to drop below 2% until early 2027 and (b) wages still rising by
just below 5%, resulting in a 7-2 vote to keep rates at 4.00% at the
September Monetary Policy Committee (MPC) meeting, which narrowed
to 5-4 in favour of holding rates at 4.00% at the November MPC
meeting.  Markets are now factoring in a rate cut to 3.75% at the next
MPC meeting (18 December 2025), although fiscal policy arising from
the UK Budget on 26 November 2025 may well yet change this path. 
At this juncture, MUFG Corporate Markets still forecast longer term
borrowing rates to gradually fall back over the next two to three years as
inflation dampens, and for bank rate to gradually drop from 4.00% to
3.25% with one base rate cut per financial year; although there remains
upside risk to all forecasts at present. 
More detail is provided in Appendices 1, 2 and 3.  
NOW Dec-25 Mar-26 Jun-26 Sep-26 Dec-26 Mar-27 Jun-27 Sep-27 Dec-27 Mar-28 Jun-28 Sep-28
BANK RATE 4.00% 4.00% 3.75% 3.75% 3.50% 3.50% 3.50% 3.50% 3.25% 3.25% 3.25% 3.25% 3.25%
3 month average earnings 4.06% 4.00% 3.80% 3.80% 3.50% 3.50% 3.50% 3.50% 3.30% 3.30% 3.30% 3.30% 3.30%
6 month average earnings 3.97% 3.90% 3.70% 3.70% 3.50% 3.50% 3.50% 3.50% 3.30% 3.30% 3.40% 3.40% 3.40%
12 month average earnings 3.84% 3.90% 3.70% 3.70% 3.50% 3.50% 3.50% 3.50% 3.30% 3.40% 3.50% 3.60% 3.60%
5 Year PWLB 4.77% 4.70% 4.50% 4.40% 4.30% 4.30% 4.30% 4.20% 4.20% 4.20% 4.20% 4.10% 4.10%
10 Year PWLB 5.36% 5.20% 5.00% 4.90% 4.80% 4.80% 4.80% 4.70% 4.70% 4.70% 4.70% 4.60% 4.60%
25 Year PWLB 6.04% 5.90% 5.70% 5.70% 5.50% 5.50% 5.50% 5.40% 5.40% 5.30% 5.30% 5.30% 5.20%
50 Year PWLB 5.84% 5.60% 5.40% 5.40% 5.30% 5.30% 5.30% 5.20% 5.20% 5.10% 5.10% 5.00% 5.00%
MUFG Corporate Markets Interest Rate View November 2025
Page 21 of 134

Page 22

5.2 Actual & Expected Treasury Activity in Second Half of 2025/26 
Actual Activity in Second Half of 2025/26 
Borrowing 
New long-term borrowing of £40.000 million was secured in early
November 2025, this being one £40.000 million PWLB EIP loan with a
tenor of 8 years and at an interest rate of 4.21%, with borrowing secured
in order to de-risk the Council’s in-year capital financing requirement in
advance of the UK budget on 26 November, and taking advantage of a
dip in Gilt Yields which returned yields at the shorter end of the Gilt Yield
curve back to levels last seen in early 2025/26. 
Debt Rescheduling 
With the whole of the gilt yield curve shifting upwards and remaining
higher, the Council has continued to review opportunities to reschedule
part of its external debt portfolio. 
This involves the Council repaying loans prematurely (both market and
PWLB) whilst high discount rates on premature repayment prevail (i.e.
where the spread between the refinancing rate and the redemption rate
is highest). 
In November 2025, the Council elected to reschedule (prematurely
repay) PWLB debt as follows:- 
• £12.700 million PWLB Maturity loan, original drawn date of 2
August 2027 and existing maturity date of 15 May 2053, at a fixed
interest rate of 4.55% 
The premature repayment of this PWLB loan to the UK Debt
Management Office has generated a one-off discount (credit) of £1.079
million to the Council and is expected to generate further cash savings
(in interest costs on external debt) to the Council of £1.064m, and so a
total expected cash saving of £2.187 million, over the next 27 years. 
This equates to a positive NPV of £1.787 million (at the Treasury Green
Book discount rate of 3.50%). 
This debt rescheduling has therefore allowed the Council to generate an
initial cash saving whilst also ensuring that the expected refinancing of
the debt remains prudent and affordable across both the short and
medium/long term.  
Page 22 of 134

Page 23

Total External Debt Portfolio at 18 November 2025 
The Council’s total external debt portfolio as at 18 November 2025 is
therefore as follows:-
Table 4: Council’s Loan Portfolio at 18 November 2025 
Loan Type
18 November 2025
Principal
Outstanding
£000’s
Weighted
Average
Rate %
PWLB Annuity 332 8.92%
PWLB Maturity 340,802 3.12%
PWLB EIP 68,875 4.24%
LOBO 15,000 4.63%
Market Loans 20,208 3.04%
Total Loans 445,217 3.34% 
Expected Activity in the remainder of the Second Half of 2025/26 
The expected activity in the second half of 2025/26, as outlined below,
updates the treasury management position in light of the economic
position as outlined in Section 5.1 above, and the General Services and
HRA Capital Plans as will be presented to Council at Quarter 2
Monitoring (16 December 2025). 
Borrowing 
Long term borrowing of £2.828 million matures in the second half of
2025/26, this being £0.519 million of PWLB Maturities, £1.933 million of
PWLB EIPs, £0.344 million of Market Loans and £0.032 million PWLB
Annuities. 
Proactive Treasury Management by the Council in the last decade has
placed the Council in a strong refinancing position for its existing
external debt portfolio; however the prevailing interest rate environment,
with the continued plateau in long-term (PWLB) borrowing rates, has
driven an approved Treasury Management strategy to go relatively short
dated with new borrowing undertaken in the most recent financial years,
with the expectation that this new borrowing will be refinanced at
maturity with longer dated borrowing, given all interest rate forecasts
show a gradual easing in medium to long term borrowing rates
throughout the forecast period as outlined in Table 3. 
This relatively short-dated new borrowing that has been undertaken
increases the short-medium term borrowing requirement for the Council,
with a larger slice of the Council’s existing debt portfolio maturing in the
remainder of the current and forthcoming 4 financial years (total of
£111.599 million or 25.07% of the total existing debt portfolio).  This is in
Page 23 of 134

Page 24

addition to already approved borrowing per the Council’s approved
General Services and HRA Capital Plans. 
Table 5: Maturity Profile of Existing External Loan Portfolio 
Financial Year 2025/26
Remaining
£000’s
2026/27
£000’s
2027/28-
2029/30
£000’s
2030/31-
2034/35
£000’s
2035/36-
2044/45
£000’s
2045/46+ 
£000’s
Debt Maturing 2,828 19,675 89,096 85,512 22,220 225,886
% of total portfolio 0.64% 4.42% 20.01% 19.21% 4.99% 50.74% 
The approved Treasury Management Strategy for borrowing is to
continue to fund the in-year Capital Financing Requirements from PWLB
for a relatively shorter-term duration (3-5 year debt tenors), to navigate
past the current interest rate hump, with gilt yields expected to gradually
ease throughout the course of the next 12-36 months. 
However, as part of this strategy, cognisance will continue to be taken of
the overall level of financing required in the period out to 2029/30, to
ensure that the Council can retain a relatively smooth debt maturity
profile over this period and beyond. 
The Council continues to operate in a position whereby borrowing takes
advantage of any dips in longer-term borrowing rates from PWLB and
other sources, in order to maintain a low weighted average coupon rate
on external debt. 
As noted in Section 5.1 (Table 3), the current PWLB yield curve remains
elevated and is bell shaped with a peak in rates around the 20-30 year
tenor (6.04%), with 5-10 year rates at c. 4.70-5.35% and 50 year rates
are c. 5.84%. 
The yield curve is expected to remain bell shaped over the short-medium
term forecast period, with:- 
• a gradual shift downwards of the entire curve by c. 30-40bps over
the next 12 months and
• a further 10-20bps drop over the subsequent 12 months. 
This is a shallower drop than previously expected, meaning long-term
borrowing rates are likely to remain higher and stickier for longer. 
In addition, the differential between shorter dated gilts (5 year, currently
at 4.70%) and longer dated gilts (25 year, currently at 5.60%) is
particularly marked, with a spread of around 90bps remaining throughout
the period of the forecast. 
To put this into context, for every £10 million borrowed, sourcing this
from longer-dated borrowing would equate to an additional £90,000 per
annum in external debt interest costs.  To refinance the existing debt
Page 24 of 134

Page 25

maturities of £111.599 million in the forthcoming 4 financial years solely
from longer dated borrowing, this would equate to an additional £1.004
million per annum in external debt interest costs. 
Therefore, whilst the funding of the Council’s in-year and forward CFR is
typically for infrastructure with long asset lives (50-60 years) – and the
tenor of PWLB and market loans are typically drawn with this in mind –
consideration for any new borrowing in the remainder of the 2025/26
financial year, to fund the Council’s in-year CFR, will seek to balance:- 
a) the security/certainty of current relatively high and expensive
longer-term borrowing rates of upwards of 5.60% in the 30-50
year duration (which are forecast to drop by 30-40bps within one
year and 50-60bps within 24 months) and the potential additional
budgetary pressure that this brings in both the short/medium and
longer term; with
b) the option to borrow initially for a shorter-term duration from
PWLB or other markets, for 2 to 5 years, to allow the Council to
fund the immediate in-year borrowing requirement.  Based on
current interest rate forecasts (see Table 3), this would then allow
the Council the option to either (i) refinance this borrowing at
initial maturity with less expensive, longer term borrowing, e.g. a
45 to 48 year tenor in, say, 36 months, or (ii) refinance this
borrowing at initial maturity with further shorter-dated borrowing;
to allow the Council to navigate past the current elevated and
sticky interest rate environment on longer-dated gilts. 
It is expected that any further long-term borrowing that is undertaken in
2025/26 to finance the current & future year capital plans will be sourced
by drawing new PWLB loans at the Certainty Rate (which has been
available to the Council since 2012 and is priced at Gilts+80bps), and/or
the HRA rate.  The HRA rate is available to all Councils (the availability
of which was extended out in the UK Government Budget to the 31
March 2026) to fund HRA capital expenditure, at a rate that is 40bps
lower than the current certainty rate available from the PWLB (so priced
at Gilts + 40bps). 
Both the General Services and HRA capital programmes are being kept
under regular review due to the effects of inflationary pressures,
shortages of materials and labour, and the ratios of financing costs to the
net revenue streams and impact on the Council’s Medium Term
Financial Strategy.  The Council’s borrowing strategy will, therefore, also
be regularly reviewed and then revised, if necessary, to achieve
optimum value and risk exposure in the long-term.  The impact
particularly of the finalisation of the General Services Capital Plan
Prioritisation and full Asset Management Plans will have a significant
bearing on this.  Council officers, in conjunction with MUFG, will continue
to monitor daily long-term borrowing rates in order to take advantage of
any dips in the market or to de-risk any change in the medium-longer
term forecast for gilt yields. 
Page 25 of 134

Page 26

Debt Rescheduling 
Council officers will continue to explore debt rescheduling opportunities
with MUFG Corporate Markets; with only prudent and affordable debt
rescheduling that considers both the short and medium-longer term
impact being considered. 
Funds on Deposit 
In accordance with the Prudential and Treasury Management Codes, it
is the Council’s priority for funds on deposit to ensure:- 
• security of capital first
• liquidity second, and
• finally to obtain an appropriate level of return which is consistent
with the Council’s risk appetite. 
In the current economic climate, it is considered appropriate to keep any
deposits short term to cover cash flow needs, but also to seek out value
available in periods up to 12 months with high credit quality financial
institutions, using the MUFG suggested creditworthiness approach,
which includes a minimum sovereign credit rating and Credit Default
Swap (CDS) overlay information. 
Based on the interest rate forecasts as outlined in Section 5.1 above,
there continues to be a clear differential between any borrowing costs
taken for new PWLB loans (whether 5 year, 25 year or 50 year), and
interest earned on Fixed Term Deposits (FTD’s) of up to 12 months. 
Specifically:- 
• the cost of borrowing is now currently 4.70%-5.90% (PWLB
certainty rates as per Table 3); whereas maximum interest
earnable on FTD’s is 3.90% (so a differential of 0.80% to 2.00%). 
• The forecast position in 12 months is similar – borrowing rates of
4.30%-5.50% (certainty rates) compared to interest earnable on
FTD’s of max 3.50% (so again a differential of 0.80% to 2.00%) 
• In 24 months, borrowing rates of 4.20%-5.30% (certainty rates)
compared to interest earnable on FTD’s of 3.40% (so a differential
of 0.80%-1.90%) 
This would suggest that the optimum Treasury strategy would be, as per
the strategy approved by Council in February 2025, to continue to run
down cash balances to allow borrowing to (continue to) be deferred for
as long as possible i.e. minimise the cash backing of reserves. 
Clearly this position results in an elevated refinancing risk, as the
internal-borrowing / under-borrowed position for the Council remains
high (c. £84m at 31/03/2026, slightly down from an under borrowed
Page 26 of 134

Page 27

position of £90m at 31/03/2025); however the flipside of this is that there
is (a) an offsetting reduction in counterparty risk on deposits (less FTD’s
placed) – thereby replacing one additional risk with an offsetting
mitigation in risk elsewhere; and (b) furthermore that all the market led
and economic forecast intelligence still points to the medium term
forecast of a path of long-term borrowing rates gradually easing off over
the next 24-36 months and beyond. 
Day to day liquidity to meet cashflow requirements is sourced from the
Council’s three Money Market Funds, which all operate on an instant
access basis.  Interest rates receivable from these are currently between
4.03%-4.06%, reflective of the current Bank of England Base Rate, and
will meander towards 4.00% in the coming month.  The Council will keep
enough liquidity in its MMF’s on a month-to-month basis to ensure we
can manage our daily cashflow needs (£15m-£20m). 
An updated list of Countries for Deposits as at 18 November 2025 is
included as Appendix 4. 
5.3 Expected Loan & Fund on Deposit Portfolio at 31 March 2026 
Taking all of the above into account, the expected loan and funds on
deposit portfolios at 31 March 2026 is shown in Tables 6 and 7 below:- 
Table 6: Council’s forecast Loan Portfolio at 31 March 2026 
Loan Type
31 March 2026
Principal
Outstanding
£000’s
Weighted
Average
Rate
PWLB Annuity 332 8.91%
PWLB Maturity 367,983 3.23%
PWLB EIP 67,542 4.24%
LOBO 15,000 4.63%
Market Loans 19,864 3.04%
Total Loans 470,722 3.42%   
Underlying Borrowing Requirement 555,028 
Over/(Under) Borrowing -84,306 
Table 7: Council’s forecast Funds on Deposit Portfolio at 31 March 2026 
Type
31 March 2026
Principal
Outstanding
£000’s
Weighted
Average
Rate
Money Market Funds 10,000 3.75%
Bank Call Accounts 369 3.25%
Bank Fixed Term Deposits 10,000 4.18%
Total Deposits 20,369 3.95%
Page 27 of 134

Page 28

The forecast Under-Borrowed position of £84.306 million at 31 March
2026 as outlined in Table 5 above equates to 15% of the Council’s
projected Total Underlying Borrowing Requirement of £555.028 million. 
The equivalent position at 31 March 2025 was 19% (£90.421 million
under-borrowed of a £469.866 million Total Underlying Borrowing
Requirement). 
Graph 1 below outlines the Under-Borrowed position of Scottish
Councils as at the most recent balance sheet date (31 March 2025).  A
negative borrowing % indicates that the Council is Internally Borrowed,
with this ratio calculated as the % of Under-Borrowing against the
Council’s total Underlying Borrowing Requirement. 
Graph 1: Under-borrowed (Internal Borrowing) % of Scottish Councils at
31 March 2025 
* Midlothian 
As can be noted, the majority of Scottish Councils are under-borrowed,
with an average around the 17.5% mark.  The proposed Borrowing &
Deposit strategy approach outlined above keeps the Council well within
this Scotland-wide position. 
Page 28 of 134

Page 29

6 Prudential & Treasury Management Indicators 2025/26 
It is a statutory duty for the Council to determine and keep under review
the affordable capital expenditure and borrowing limits as outlined in the
prudential and treasury management indicators reported as part of the
Council’s suite of treasury management reports. 
The following prudential indicators have therefore been refreshed from
those reported to Council on 25 February 2025 in the original Treasury
Management and Annual Investment Strategy Statement 2025/26. 
These are technical revisions to the Prudential Indicators as a
consequence of the revisions to the Council’s General Services and
HRA Capital Plans and are based on the actual capital plan outturns for
2024/25, and revisions to the capital expenditure and income budgets for
2025/26.  The Authorised Limit has been retained at the value set in the
Treasury Management & Investment Strategy for 2025/26 as approved
by Audit Committee and Council in February 2025. 
Table 8: Prudential Indicators 2025/26 – Mid Year Update 
Indicator
2025/26
Original
Estimate
£000’s
2025/26
Current
Position
£000’s
2025/26
Revised
Estimate
£000’s
2025/26 Capital Expenditure 171,922 38,670 128,987
2025/26 Required Borrowing 125,170 20,884 95,956
2025/26 Underlying Borrowing Requirement* 604,957 484,938 555,028
2025/26 Gross External Borrowing 528,600 418,575 470,722
2025/26 Over/(Under) Borrowing -76,357 -66,363 -84,306    
Operational Boundary – Borrowing 604,957 555,028 555,028    
2025/26 Capital Financing Requirement** 685,618 567,516 635,689    
2025/26 Authorised Limit*** 604,957 604,957 604,957    
Net Income from Service Investments as % of Net Revenue Stream 0.01%  0.01%
Ratio of Financing Costs to Net Revenue Stream – General Services 2.85%  1.86%
Ratio of Financing Costs to Net Revenue Stream – HRA 44.42%  44.22%
Ratio of HRA Debt to Net Revenue Stream 836%  842%
Ratio of HRA Debt per Dwelling 44  43
* Excludes “On balance sheet” PPP schemes.
** Includes “On balance sheet” PPP schemes.
***  Equates to the original estimate of the 2025/26 Underlying Borrowing
Requirement 
The Capital Financing Requirement (CFR) denotes the Council’s
underlying need to borrow for capital purposes.  The CFR includes
borrowing arising as a result of the Council’s Capital Plans, plus the
Page 29 of 134

Page 30

long-term liability arising from the Council’s PPP and DBFM contracts. 
The Underlying Borrowing Requirement strips out the latter of these
(long-term liability arising from the two PPP contracts) from the CFR. 
The Authorised Limit represents the statutory limit determined under
section 3 (1) of the Local Government Act 2003, and is the limit beyond
which borrowing is prohibited.  This limit needs to be set and revised by
Members.  For 2025/26 this was calculated to equate to the forecast
value of the 2025/26 Underlying Borrowing Requirement. 
During the year to date, the Council has operated within the treasury and
prudential indicators set out in the Council’s Treasury Management
Strategy Statement for 2025/26. 
All treasury management operations have also been conducted in full
compliance with the Council's Treasury Management Practices.  
Page 30 of 134

Page 31

7 Performance Indicators 2024/25 – Comparison with Other Scottish
Local Authorities 
The CIPFA Scottish Treasury Management Forum collates performance
indicators for all Scottish Local Authorities.  The indicators relating to
financial year 2024/25 have been published and once again demonstrate
the continuing effectiveness of the Council’s Treasury function in
maximising efficiency in Treasury Management activity, with the Council
having the lowest weighted average borrowing & investment (loans fund)
rate across all Scottish mainland authorities in 2024/25 (2.73%). 
The Council has consistently maintained its loans fund rate as either the
lowest, one of the lowest, across all Scottish mainland authorities for the
last decade and more.  Appendix 5 outlines the loans fund rate for each
Scottish Local Authority in 2024/25. 
Were the internal loans fund rate for 2024/25 to have equated to the
Scottish weighted average for 2024/25 of 4.12%, this would have
generated loan charges for Midlothian Council in 2024/25 of £28.4 million. 
The Council’s actual 2024/25 loan charges for General Services and HRA
were £22.3 million, representing a cash saving (compared to the Scottish
average) of £6.1 million in 2024/25. 
The forecast loans fund rate of 2.64% for 2025/26 is expected to once
again be one of the lowest for all Scottish Local Authorities. 
8 Summary 
Treasury Management activity during the year to 18 November 2025 has
been effective within the parameters set by the strategy for the year. 
Any further long-term borrowing for the remainder of 2025/26 will be in
line with the approved strategy, and reflective of the borrowing
requirement arising from the General Services and HRA capital plans
that will be reported to Council on 16 December 2025, and existing debt
maturity profile.  Debt rescheduling opportunities will continue to be
assessed. 
Officers will continue to review the opportunities available to the Council
for deposit of funds as governed by the approved strategy. 
The Prudential and Treasury Management Indicators have been updated
to reflect current capital expenditure and income projections.  
Page 31 of 134

Page 32

9 Report Implications 
9.1 Resource 
Expenditure from Treasury Management activity i.e. loan charges, is
reported in the quarterly financial positions to Council, with Quarter 2
monitoring reflected in the Financial Monitoring 2025/26 – General Fund
Revenue report that will be presented to Council on 16 December 2025. 
9.2 Digital 
None. 
9.3 Risk 
As the Council follows the requirements of the CIPFA Code of Practice
for Treasury Management, and the Prudential Code, there is a reduced
level of risks involved in Treasury Management activities. Those risks
that do exist are further controlled through written Treasury Management
Practices which define the responsibilities of all staff involved, which
were reviewed and approved by Audit Committee as part of the
presentation of the 2023/24 Mid-Year Review Report on 6 December
2022. 
9.4 Ensuring Equalities 
There are no equalities issues arising directly from this report. 
9.5 Additional Report Implications 
See Appendix A.  
Page 32 of 134

Page 33

Appendix A: Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable. 
A.2 Key Drivers for Change 
A.3 Key Delivery Streams 
Themes addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value. 
A.5 Involving Communities and Other Stakeholders 
Although no external consultation has taken place, cognisance has been
taken of professional advice obtained from Link Treasury Solutions
Limited, the Council’s appointed Treasury Consultants. 
A.6 Impact on Performance and Outcome 
The strategies adopted are an integral part of the corporate aim to
achieve Best Value as they seek to minimise the cost of borrowing by
exercising prudent debt management and investment.  This in turn helps
to ensure that the Council’s capital expenditure is sustainable in revenue
terms. 
A.7 Adopting a Preventative Approach 
Not applicable. 
A.8 Supporting Sustainable Development 
Not applicable. 
Page 33 of 134

Page 34

Background Papers: 
Appendix 1: Economic Update for first part of 2025/26 financial year
Appendix 2: PWLB Borrowing Rates 1 April 2025 to 30 September 2025
Appendix 3: Bank Rate and SONIA Rates 1 April 2025 to 30 September 2025
Appendix 4: Approved Countries for Deposits as at 18 November 2025
Appendix 5: Loans Fund Rate Comparison Scottish Local Authorities 2024/25 
Page 34 of 134

Page 35

Appendix 1: Economic Update for first part of 2025/26 financial year 
The first half of 2025/26 saw: 
• A 0.3% pick up in Gross Domestic Product (GDP) for the period April to June
2025. More recently, the economy flatlined in July, with higher taxes for
businesses restraining growth.
• The rate of average earnings growth excluding bonuses has fallen from 5.5%
to 4.8% in July.
• Consumer Price Inflation (CPI) has ebbed and flowed but finished September
at 3.8%, whilst core inflation eased to 3.6%.
• The Bank of England cut interest rates from 4.50% to 4.25% in May, and then
to 4% in August.
• The 10-year gilt yield fluctuated between 4.4% and 4.8%, ending the half year
at 4.70%. 
From a GDP perspective, the financial year got off to a bumpy start with the 0.3%
m/m fall in real GDP in April as front-running of US tariffs in Quarter 1 (when GDP
grew 0.7% on the quarter) weighed on activity. Despite the underlying reasons for
the drop, it was still the first fall since October 2024 and the largest fall since October
2023. However, the economy surprised to the upside in May and June so that
quarterly growth ended up 0.3% quarter on quarter (q/q). Nonetheless, the 0.0%
month on month (m/m) change in real GDP in July will have caused some concern,
with the hikes in taxes for businesses that took place in April this year undoubtedly
playing a part in restraining growth. The weak overseas environment is also likely to
have contributed to the 1.3% m/m fall in manufacturing output in July. That was the
second large fall in three months and left the 3 months to 3 months rate at a 20-
month low of -1.1%. The 0.1% m/m rise in services output kept its 3 months to 3
months rate at 0.4%, supported by stronger output in the health and
arts/entertainment sectors. Looking ahead, ongoing speculation about further tax
rises in the Autumn Budget on 26 November will remain a drag on GDP growth for a
while yet. GDP growth for 2025 is forecast by Capital Economics to be 1.3%. 
Sticking with future economic sentiment, the composite Purchasing Manager Index
(PMI) for the UK fell from 53.5 in August to 51.0 in September. The decline was
mostly driven by a fall in the services PMI, which declined from 54.2 to 51.9. The
manufacturing PMI output balance also fell, from 49.3 to 45.4. That was due to both
weak overseas demand (the new exports orders balance fell for the fourth month in a
row) and the cyber-attack-induced shutdown at Jaguar Land Rover since 1
September reducing car production across the automotive supply chain. The PMIs
suggest tepid growth is the best that can be expected when the Quarter 3 GDP
numbers are released. 
Turning to retail sales, and the 0.5% m/m rise in volumes in August was the third
such rise in a row and was driven by gains in all the major categories except fuel
sales, which fell by 2.0% m/m. Sales may have been supported by the warmer-than-
usual weather. If sales were just flat in September, then in Quarter 3 sales volumes
would be up 0.7% q/q compared to the 0.2% q/q gain in Quarter 2. 
With the November Budget edging nearer, the public finances position looks weak. 
Public net sector borrowing of £18.0bn in August means that after five months of the
financial year, borrowing is already £11.4bn higher than the Office for Budget
Responsibility (OBR) forecast at the Spring Statement in March. The overshoot in
the Chancellor’s chosen fiscal mandate of the current budget is even greater with a
cumulative deficit of £15.3bn. All this was due to both current receipts in August
Page 35 of 134

Page 36

being lower than the OBR forecast (by £1.8bn) and current expenditure being higher
(by £1.0bn). Over the first five months of the financial year, current receipts have
fallen short by a total of £6.1bn (partly due to lower-than-expected self-assessment
income tax) and current expenditure has overshot by a total of £3.7bn (partly due to
social benefits and departmental spending). Furthermore, what very much matters
now is the OBR forecasts and their impact on the current budget in 2029/30, which is
when the Chancellor’s fiscal mandate bites. As a general guide, Capital Economics
forecasts a deficit of about £18bn, meaning the Chancellor will have to raise £28bn,
mostly through higher taxes, if she wants to keep her buffer against her rule of
£10bn. 
The weakening in the jobs market looked clear in the spring. May’s 109,000 m/m fall
in the Pay-As-You-Earn (PAYE) measure of employment was the largest decline
(barring the pandemic) since the data began and the seventh in as many months.
The monthly change was revised lower in five of the previous seven months too, with
April’s 33,000 fall revised down to a 55,000 drop. More recently, however, the
monthly change was revised higher in seven of the previous nine months by a total
of 22,000. So instead of falling by 165,000 in total since October, payroll employment
is now thought to have declined by a smaller 153,000. Even so, payroll employment
has still fallen in nine of the ten months since the Chancellor announced the rises in
National Insurance Contributions (NICs) for employers and the minimum wage in the
October Budget. The number of job vacancies in the three months to August stood at
728,000. Vacancies have now fallen by approximately 47% since its peak in April
2022. All this suggests the labour market continues to loosen, albeit at a declining
pace. 
A looser labour market is driving softer wage pressures. The rate of average
earnings growth excluding bonuses has fallen from 5.5% in April to 4.8% in July. The
rate for the private sector slipped from 5.5% to 4.7%, putting it on track to be in line
with the Bank of England’s Quarter 3 forecast (4.6% for September). 
CPI inflation fell slightly from 3.5% in April to 3.4% in May, and services inflation
dropped from 5.4% to 4.7%, whilst core inflation also softened from 3.8% to 3.5%. 
More recently, though, inflation pressures have resurfaced, although the recent
upward march in CPI inflation did pause for breath in August, with CPI inflation
staying at 3.8%. Core inflation eased once more too, from 3.8% to 3.6%, and
services inflation dipped from 5.0% to 4.7%. So, we finish the half year in a similar
position to where we started, although with food inflation rising to an 18-month high
of 5.1% and households’ expectations for inflation standing at a six year high, a
further loosening in the labour market and weaker wage growth may be a requisite to
UK inflation coming in below 2.0% by 2027. 
An ever-present issue throughout the past six months has been the pressure being
exerted on medium and longer dated gilt yields. The yield on the 10-year gilt moved
sideways in the second quarter of 2025, rising from 4.4% in early April to 4.8% in
mid-April following wider global bond market volatility stemming from the “Liberation
Day” tariff announcement, and then easing back as trade tensions began to de-
escalate. By the end of April, the 10-year gilt yield had returned to 4.4%. In May,
concerns about stickier inflation and shifting expectations about the path for interest
rates led to another rise, with the 10-year gilt yield fluctuating between 4.6% and
4.75% for most of May. Thereafter, as trade tensions continued to ease and markets
increasingly began to price in looser monetary policy, the 10-year yield edged lower,
and ended Quarter 2 at 4.50%. 
Page 36 of 134

Page 37

More recently, the yield on the 10-year gilts (which drives PWLB borrowing rates)
rose from 4.46% to 4.60% in early July as rolled-back spending cuts and uncertainty
over Chancellor Reeves’ future raised fiscal concerns. Although the spike proved
short lived, it highlighted the UK’s fragile fiscal position. In an era of high debt, high
interest rates and low GDP growth, the markets are now more sensitive to fiscal risks
than before the pandemic. During August, long-dated gilts underwent a particularly
pronounced sell-off, climbing 22 basis points and reaching a 27-year high of 5.6% by
the end of the month, pushing PWLB borrowing rates in the same direction. While
yields (and PWLB borrowing rates) have since eased back, the market sell-off was
driven by investor concerns over growing supply-demand imbalances, stemming
from unease over the lack of fiscal consolidation and reduced demand from
traditional long-dated bond purchasers like pension funds. For 10-year gilts, by late
September, sticky inflation, resilient activity data and a hawkish Bank of England
have kept yields elevated over 4.70% (with a corresponding elevation in PWLB
borrowing rates). 
The Financial Times Stock Exchange (FTSE) 100 fell sharply following the
“Liberation Day” tariff announcement, dropping by more than 10% in the first week of
April - from 8,634 on 1 April to 7,702 on 7 April. However, the de-escalation of the
trade war coupled with strong corporate earnings led to a rapid rebound starting in
late April. As a result, the FTSE 100 closed Quarter 2 at 8,761, around 2% higher
than its value at the end of Quarter 1 and more than 7% above its level at the start of
2025. Since then, the FTSE 100 has enjoyed a further 4% rise in July, its strongest
monthly gain since January and outperforming the S&P 500. Strong corporate
earnings and progress in trade talks (US-EU, UK-India) lifted share prices and the
index hit a record 9,321 in mid-August, driven by hopes of peace in Ukraine and
dovish signals from Fed Chair Powell. September proved more volatile and the
FTSE 100 closed Quarter 3 at 9,350, 7% higher than at the end of Quarter 1 and
14% higher since the start of 2025. Future performance will likely be impacted by the
extent to which investors’ global risk appetite remains intact, Fed rate cuts, resilience
in the US economy, and Artificial Intelligence optimism. A weaker pound will also
boost the index as it inflates overseas earnings. 
MPC meetings: 8 May, 19 June, 7 August, 18 September, 6 November 2025 
There were five Monetary Policy Committee (MPC) meetings in the year to 18
November. In May, the Committee cut Bank Rate from 4.50% to 4.25%, while in
June policy was left unchanged. In June’s vote, three MPC members (Dhingra,
Ramsden and Taylor) voted for an immediate cut to 4.00%, citing loosening labour
market conditions. The other six members were more cautious, as they highlighted
the need to monitor for “signs of weak demand”, “supply-side constraints” and higher
“inflation expectations”, mainly from rising food prices. By repeating the well-used
phrase “gradual and careful”, the MPC continued to suggest that rates would be
reduced further. 
In August, a further rate cut was implemented.  However, a 5-4 split vote for a rate
cut to 4.00% laid bare the different views within the Monetary Policy Committee, with
the accompanying commentary noting the decision was “finely balanced” and
reiterating that future rate cuts would be undertaken “gradually and carefully”. 
Ultimately, Governor Bailey was the casting vote for a rate cut but with the CPI
measure of inflation expected to reach at least 4.00% later this year, the MPC will be
wary of making any further rate cuts until inflation begins its slow downwards
trajectory back towards 2.00%. 
Page 37 of 134

Page 38

The Bank of England does not anticipate CPI getting to 2.00% until early 2027, and
with wages still rising by just below 5.00%, it was no surprise that the September
meeting saw the MPC vote 7-2 for keeping rates at 4.00% (Dhingra and Taylor voted
for a further 25bps reduction).  This positioned narrowed at the November meeting to
5-4 in favour of holding rates at 4.00%, with markets now factoring in a rate cut to
3.75% at the next MPC meeting on 18 December, although fiscal policy arising from
the UK Budget on 26 November 2025 may well yet change this path. 
The Bank also took the opportunity to announce that they would only shrink its
balance sheet by £70bn over the next 12 months, rather than £100bn. The repetition
of the phrase that “a gradual and careful” approach to rate cuts is appropriate
suggests the Bank still thinks interest rates will fall further but possibly not until
February, which aligns with both our own view and that of the prevailing market
sentiment.   
Page 38 of 134

Page 39

Appendix 2: PWLB Borrowing Rates 1 April 2025 to 30 September 2025 
The graphs and table below show the movement in PWLB certainty rates for the first
six months of the year to date: 
PWLB certainty rates 1 April 2025 to 30 September 2025 
1 Year 5 Year 10 Year 25 Year 50 Year
01/04/2025 4.82% 4.94% 5.38% 5.95% 5.63%
30/09/2025 4.58% 4.95% 5.53% 6.23% 5.98%
Low 4.36% 4.62% 5.17% 5.78% 5.46%
Low date 04/08/2025 02/05/2025 02/05/2025 04/04/2025 04/04/2025
High 4.84% 4.99% 5.62% 6.41% 6.14%
High date 02/04/2025 21/05/2025 03/09/2025 03/09/2025 03/09/2025
Average 4.55% 4.82% 5.40% 6.11% 5.83%
Spread 0.48% 0.37% 0.45% 0.63% 0.68%
4.00%
4.50%
5.00%
5.50%
6.00%
6.50%
7.00%
PWLB Rates 01.04.25 - 30.09.25
1 Year 5 Year 10 Year 25 Year 50 Year 50 year target %
Page 39 of 134

Page 40

The current PWLB rates are set as margins over gilt yields as follows:- 
• PWLB Standard Rate is gilt plus 100 basis points (G+100bps)
• PWLB Certainty Rate (GF) is gilt plus 80 basis points (G+80bps)
• PWLB Local Infrastructure Rate is gilt plus 60 basis points (G+60bps)
• PWLB Certainty Rate (HRA) is gilt plus 40bps (G+40bps) 
PWLB maturity certainty rates (gilts plus 80bps) year to date to 30 September
2025 
Gilt yields and PWLB certainty rates have remained relatively volatile throughout the
six months under review, but the general trend has been for medium and longer
dated parts of the curve to shift higher whilst the 5-year part of the curve finished
September close to where it begun in April. 
Concerns around the stickiness of inflation, elevated wages, households’ inflation
expectations reaching a six-year high, and the difficult funding choices facing the
Chancellor in the upcoming Budget on 26 November dominated market thinking,
although international factors emanating from the Trump administration’s fiscal, tariff
and geo-political policies also played a role. 
At the beginning of April, the 1-year certainty rate was the cheapest part of the curve
at 4.82% whilst the 25-year rate was relatively expensive at 5.92%.  Early
September saw the high point for medium and longer-dated rates, although there
was a small reduction in rates, comparatively speaking, by the end of the month. 
The spread in the 5-year part of the curve (the difference between the lowest and
highest rates for the duration) was the smallest at 37 basis points whilst, conversely,
the 50-years’ part of the curve saw a spread of 68 basis points. 
At this juncture, MUFG Corporate Markets still forecast rates to fall back over the
next two to three years as inflation dampens, although there is upside risk to all
3.00
3.40
3.80
4.20
4.60
5.00
5.40
5.80
6.20
6.60
7.00
PWLB Certainty Rate Variations 01.04.25 to 30.09.25
1-Apr-25 30-Sep-25 Average
Page 40 of 134

Page 41

forecasts at present.  The CPI measure of inflation is expected to fall below 2% in
early 2027 but hit a peak of 4% or higher later in 2025. 
The Bank of England announced in September that it would be favouring the short
and medium part of the curve for the foreseeable future when issuing gilts, but
market reaction to the November Budget is likely to be the decisive factor in future
gilt market attractiveness to investors and their willingness to buy UK sovereign debt.  
Page 41 of 134

Page 42

Appendix 3: Bank Rate and Sterling Overnight Index Average (SONIA) Rates 1
April 2025 to 30 September 2025 
The graphs and table below show the movement in Bank and SONIA rates for the
first six months of the year to date: 
Creditworthiness: The UK’s sovereign rating has proven robust through the first
half of 2025/26. The Government is expected to outline in detail its future fiscal
proposals in the Budget scheduled for 26 November 2025. 
Deposit Counterparty criteria: The current deposit counterparty criteria selection
approved in the TMSS is meeting the requirement of the treasury management
function. 
CDS prices: It is noted that sentiment in the current economic climate can easily
shift, so it remains important to undertake continual monitoring of all aspects of risk
and return in the current circumstances. 
3.50
3.75
4.00
4.25
4.50
4.75
5.00
Bank Rate vs term SONIA rates % 01.04.25 - 30.09.25
Bank Rate SONIA 1 mth 3 mth 6 mth 12 mth
Bank Rate SONIA 1 mth 3 mth 6 mth 12 mth
High 4.50 4.46 4.47 4.36 4.28 4.17
High Date 01/04/2025 07/05/2025 03/04/2025 01/04/2025 02/04/2025 02/04/2025
Low 4.00 3.97 3.97 3.96 3.89 3.75
Low Date 07/08/2025 29/08/2025 16/09/2025 08/09/2025 07/08/2025 04/08/2025
Average 4.23 4.19 4.16 4.10 4.01 3.88
Spread 0.50 0.49 0.50 0.39 0.39 0.42
Page 42 of 134

Page 43

Appendix 4: Approved Countries for Deposit as at 18 November 2025 
AAA
• Australia
• Denmark
• Germany
• Netherlands
• Norway
• Singapore
• Sweden
• Switzerland 
AA+
• Canada
• U.S.A. 
AA
• Abu Dhabi (UAE)
• Finland
• Qatar 
AA-
• Belgium
• France
• U.K. 
A+
• Belgium
• France 
Page 43 of 134

Page 44

Appendix 5: Loans Fund Rate Comparison Scottish Local Authorities 2024/25 
Council
Loans
Fund
Rate
2024/25
Midlothian 2.73%
East Lothian 2.83%
Renfrewshire 2.88%
Perth & Kinross 3.28%
Aberdeenshire 3.29%
North Ayrshire 3.36%
Angus 3.37%
Shetland 3.45%
East Ayrshire 3.46%
Fife 3.68%
Dumfries  & Galloway 3.80%
East Renfrewshire 3.87%
Edinburgh City 4.14%
West Lothian 4.17%
Aberdeen City 4.20%
South Ayrshire 4.23%
Scottish Borders 4.25%
Highland 4.32%
East Dunbartonshire 4.41%
Dundee City 4.50%
Inverclyde 4.61%
West Dunbartonshire 4.64%
Argyll & Bute 4.71%
Glasgow City 4.77%
Falkirk 4.78%
North Lanarkshire 4.87%
Stirling 5.35%
Orkney 5.72%
Moray 6.21%
Comhairle Nan Eilean Siar 6.40%
Page 44 of 134

Page 45

Audit Committee
Tuesday 2 December 2025
Item No 5.2 
Internal Audit Work to November 2025 
Report by Chief Internal Auditor 
Report for Decision 
1 Recommendations 
The Audit Committee is asked to:
a) Consider the Executive Summary of the final Internal Audit assurance report issued
associated with the delivery of the approved Internal Audit Annual Plan 2025/26;
b) Note the Internal Audit Consultancy and Other Work carried out in accordance with the
approved Internal audit Charter; and
c) Acknowledge the assurance provided on internal controls and governance arrangements
in place for the areas covered by this Internal Audit work. 
2 Purpose of Report/Executive Summary 
The purpose of this report is to provide members of the Audit Committee with details of the
recent work carried out by Internal Audit and the findings and recommended audit actions
agreed by Management to improve internal controls and governance arrangements. 
The Internal Audit Annual Plan 2025/26 was approved by the Audit Committee on 24
February 2025. Internal Audit has carried out work associated with the delivery of the plan to
meet its objective of providing an opinion on the efficacy of the Council’s risk management,
internal control and governance. 
An Executive Summary of the final Internal Audit assurance report issued, including audit
objective, findings, good practice and recommendations (where appropriate), and the Chief
Internal Auditor’s independent and objective opinion on the adequacy of the control
environment and governance arrangements within each audit area is shown in Appendix 1. 
The Internal Audit function conforms to the professional standards as set out in Global
Internal Audit Standards (GIAS) including the production of this report to communicate the
results of the reviews. 
Date 14 November 2025 
Report Contact:
Duncan Stainbank
duncan.stainbank@midlothian.gov.uk
Page 45 of 134

Page 46

3 Progress Report 
3.1 The Internal Audit Annual Plan 2025/26 was approved by the Audit Committee on 24
February 2025. Internal Audit has completed the following work in the period from 18
September 2025 to 14 November 2025 associated with the delivery of the plan to meet its
objective of providing an opinion on the efficacy of the Council’s risk management, internal
control and governance. 
3.2 The Internal Audit function conforms to the professional standards as set out in Global
Internal Audit Standards (GIAS), including the production of this report to communicate the
results. 
3.3 Internal Audit issued a final assurance report on the following subjects:
• School & Social Work Transport; and 
• Foster Care and Adoption. 
3.4 An Executive Summary of the final Internal Audit assurance report issued including audit
objective conclusions, key findings, recommendations, areas of good practice, the Chief
Internal Auditor’s independent and objective opinion on the adequacy of the control
environment and governance arrangements within each audit area is shown in Appendix 1. 
3.5 Both the School & Social Work Transport review and the Foster Care and Adoption Review
have both been overall categorised as Limited Assurance. The definitions for Internal Audit
assurance categories are as follows: 
Level Definition
Substantial
Assurance
A sound system of governance, risk management and control exists, with internal controls
operating effectively and being consistently applied to support the achievement of objectives in
the area audited. 
Reasonable
Assurance
There is a generally sound system of governance, risk management and control in place. Some
issues, non-compliance or scope for improvement were identified which may put at risk the
achievement of objectives in the area audited. 
Limited
Assurance
Significant gaps, weaknesses or non-compliance were identified. Improvement is required to the
system of governance, risk management and control to effectively manage risks to the
achievement of objectives in the area audited. 
No Assurance Immediate action is required to address fundamental gaps, weaknesses or non-compliance
identified. The system of governance, risk management and control is inadequate to effectively
manage risks to the achievement of objectives in the area audited. 
3.6 The School & Social Work Transport Audit was part of the 2025/26 Internal Audit plan
however the scope of the review to be completed was reviewed to meet the requirements
identified by members at the 24 June 2025 Council. Specifically, the Audit review was to
focus on the control environment in place for the 2024/25 financial year. As a result, the
report grading does not reflect the significant progress in embedding an appropriate control
framework as a result of a project that was already underway. The Audit review completed for
the control environment in 2024/25 provides an assessment of Limited Assurance reflecting
the control environment in place in the 2024/25 financial year, particularly the following: 
• The lack of a Council Policy for School Transport, 
• A lack of clarity on authorisation procedures,
• No investment in appropriate software solutions for School Transport,
Page 46 of 134

Page 47

• Financial information specifically on School Transport not flowing appropriately within
the Council, and
• Due to limited staff resources, limited contract management processes. 
3.7 However, the weaknesses in the client transport control environment had been identified prior
to the audit work commencing and an improvement project had already been funded and was
in operation. As a result, for 2025/26, the following improvements have already been
delivered: 
• A School Transport Policy was implemented in May 2025;
• Authorisation procedures for ASN transport have been agreed (although not yet
operational) and the Policy provides a clear framework for authorisation of mainstream
Education transport;
• The project has investigated software solutions and is planning to get appropriate
solutions in place;
• Improvements in availability of some financial information in 2025 have been made;
• Reviews of staff resources and procedures are planned to take place; and
• A Tender process for all client transport has been undertaken that ensures that there
is an appropriate contractual framework in place for the Council for all client transport
needs ensuring that client transport is maintained within the Council Policy and this
contractual framework will be required going forward. 
3.8 The School & Social Work Transport report identifies that from the 25 recommendations
made, management have identified that 6 are already completed and 8 are already part of
the project plan for 2026. This provides some assurance that the Client Transport Project
was already in the process of implementing an appropriate control framework.  The additional
recommendations within the review are also all now being taken forward by management. 
3.9 The School & Social Work Transport report currently being provided reflects backwards on
the control framework in place for the 2024/25 financial year. As a result of the substantial
changes in the control framework that have not been reviewed as part of this work, it would
be appropriate to include a further follow-up review of Client Transport within the 2026/27
Internal Audit Plan, subject to Audit Committee approval. This will allow a review to be
undertaken of the effectiveness of the changes put in place in improving the control
framework and assurance that officers are delivering to the approved Council Policy.  
3.10 The Foster Care and Adoption Audit provides and overall Limited assurance grading. Policies
and procedures are in place for foster care and adoption and segregation of duties for the
payment of allowances and fees are in place. However, 13 overpayments amounting to
£150K have occurred and invoices have not yet been raised for 7 of the overpayments,
adoption cases have not been reviewed for any of the cases tested, rates input to Mosaic
were incorrect for some elements and the setting of rates for adoption allowances was
unclear. A small number of incorrect payments have been identified as part of the review.
Management had prior to the review already started to resolve these issues and have
committed to implementing the recommendations made by the agreed target dates. 
Internal Audit Consultancy and Other Work 
3.11 Internal Audit staff have been involved in the following for the Council to meet its aims and
objectives, and its roles and responsibilities in accordance with the approved Internal Audit
Charter and Strategy:
a) In its critical friend role provided an independent view and challenge at various forums
including: Capital Plan and Asset Management Board, Chief Officers Risk & Resilience
Group, and the Integrity Group.
Page 47 of 134

Page 48

b) Learning and development during the research stage of new audit areas for all Internal
Audit team members and through joining audit forums (Computer Audit Sub-group) and
meetings; and
c) Monitored publication of Audit Scotland reports. 
Recommendations 
3.12 Recommendations in reports are suggested changes to existing procedures or processes to
improve the controls or to introduce controls where none exist. The grading of each
recommendation reflects the risk assessment of non-implementation, being the product of the
likelihood of the risk materialising and its impact: 
High Recommendations relating to factors fundamental to the success of the control objectives of the
system. The weaknesses may give rise to significant financial loss/misstatement or failure of
business processes. 
Medium Recommendations which will improve the efficiency and effectiveness of the existing controls. 
Low Recommendations concerning minor issues that are not critical, but which may prevent attainment
of best practice and/or operational efficiency. 
Outwith the report, Internal Audit informs operational managers about other matters as part of continuous
improvement. 
3.8 The table below summarises the number of Internal Audit recommendations made during
2025/26:
Recs Rating 2025/26 Number of Recs
High 1
Medium 25
Low 12
Not Graded 0
Sub-total reported this period 38
Previously reported 22
Total 60 
Recommendations agreed with action plan 60
Not agreed; risk accepted 0
Total 60 
4 Report Implications (Resource, Digital, Risk and Equalities) 
4.1 Resource 
Resource implications of implementing Internal Audit recommendations are considered as
part of the audit process to ensure these are reasonable and proportionate to the risks. 
4.2 Digital 
There are no digital implications arising from this report. 
Page 48 of 134

Page 49

4.3 Risk 
The GIAS require Internal Audit to evaluate the effectiveness of the Council’s Risk
Management arrangements and contribute to improvements in the process. At the start of
each audit engagement, to capture potential areas of risk and uncertainty more fully, key
stakeholders have been consulted and risk registers have been considered. During each
audit engagement the management of risk has been tested. 
It is anticipated that improvements in the management and mitigation of risks will arise as a
direct result of Management implementing the Internal Audit recommendations made. If audit
recommendations are not implemented, there is a greater risk of financial loss and/or
reduced operational efficiency and effectiveness, and Management may not be able to
demonstrate improvement in internal control and governance arrangements, and effective
management of risks. 
4.4 Ensuring Equalities 
This report does not relate to a new or revised policy, service or budget change, which
affects people (the public or staff), so an Integrated Impact Assessment (IIA) is not an
applicable consideration. 
The Internal Audit work is carried out in accordance with the appropriate legislation and
professional standards. The latter includes compliance by those within the Internal Audit
function with the ethical requirements set out in the GIAS which is appropriate for the
profession of Internal Audit founded as it is on trust placed in its independent and objective
assurance about risk management, internal control and governance. 
4.5 Additional Report Implications (See Appendix A) 
Page 49 of 134

Page 50

APPENDIX A – Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Although this report does not relate directly to the key priorities within the Single Midlothian
Plan to which Midlothian Council and its Community Planning Partners have made a
commitment (Reducing the gap in economic circumstances; Reducing the gap in learning
outcomes; Reducing the gap in health outcomes; and Reducing the impact of climate
change), good governance is important to enable Midlothian Council to deliver its key
priorities in support of achieving the Council’s objectives. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working  
Hub and Spoke  
Modern  
Sustainable  
Transformational  
Preventative  
Asset-based  
Continuous Improvement  
One size fits one 
None of the above 
Midlothian Council is committed to creating a great place to grow supported by the 9 drivers
for change. Implementing the 9 drivers for change in practice is applicable to the Council’s
Internal Audit service provision to assist the Council in achieving its objectives. 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you  
Preventative and Sustainable  
Efficient and Modern  
Innovative and Ambitious 
A.4 Delivering Best Value 
Implementation by Management of the actions associated with Internal Audit
recommendations, that are designed to improve internal control and governance
arrangements and management of risks, underpins the Council’s own continuous
improvement arrangements to enhance its effectiveness, thus supporting the delivery of the
Council’s best value duties. 
A.5 Involving Communities and Other Stakeholders 
The Chief Internal Auditor is accountable to the Audit Committee which, in fulfilling its
governance role, acts as a bridge between the Council and other stakeholders. 
Page 50 of 134

Page 51

This report has been presented to Senior Management relevant to the areas audited and
have agreed the final Internal Audit assurance reports as set out in the relevant Executive
Summary within Appendix 1. 
A.6 Impact on Performance and Outcomes 
The Findings and Recommendations from Internal Audit work during the year are designed to
assist the Council in improving its performance and outcomes. 
A.7 Adopting a Preventative Approach 
Internal Audit assurance work includes assessments on when a preventative approach can
be adopted. 
A.8 Supporting Sustainable Development 
This report does not relate directly to supporting sustainable development. Good governance
is important to enable Midlothian Council to achieve its objectives. 
Page 51 of 134

Page 52

Page 52 of 134

Page 53

Appendix 1.  Executive Summary: School and Social Work Transport
Conclusion: Limited Assurance
The control environment for School and Social Work Transport had a number of significant weaknesses in 2024/25, however, the project to
improve the arrangements for client transport from May 2024 has achieved a number of substantial milestones including: the approval of the
Integrated Transport Policy; the awarding of a new client transport framework; the onboarding and allocation of routes to new providers,
strengthened onboarding arrangements, the implementation of invoicing standards and monthly monitoring information that must be adhered
to by all suppliers.  
A significant, unforeseen overspend occurred during 2024/25 which was not identified due to a lack of information sharing between Education,
the Travel Team, and Financial Services.  Management have advised that processes have been established to ensure that this will not be
repeated.  
Although work is underway to improve systems, there is no up-to-date route management system in place and the service is managed using a
mix of different spreadsheets, which is not best practice and could result in errors.  E-Forms using the Granicus system to improve passenger
transport information have been developed but are yet to be launched.  Operational efficiencies may be achievable following review of
transport usage data and implementation of the e-forms.  
Background
The purpose of the audit was to review the processes and systems in place to ensure that the organisation of School and Social Work transport
is completed effectively, efficiently and provides best value for the Council, including ensuring that transport provision is in line with Council policy
and legislative requirements.  The Travel Team, amongst other responsibilities, is responsible for the coordination of passenger transport on
behalf of other services in the Council, primarily Education, Adult Social Care and some Children’s Services transport.  A project is currently
underway to review the Education and Social Care transport service and identify and implement improvements, savings and cost avoidance
initiatives.  The project was initiated in response to significant inflationary pressures on school transport costs, including the large increase in the
number of pupils requiring ASN transport.  
The Travel Team manages their service using a mix of different spreadsheets.  The service previously used the CTX system over three years
ago, a legacy transport system hosted on-premises, to support school transport planning amongst other tasks, but it is now obsolete (12 versions
behind the current release) and no longer used due to difficulties deleting, integrating, exporting and reporting data from the system.  The CTX
system has not yet been formally decommissioned.  
In early 2024, an external consultant was engaged to carry out a review of passenger transport at a cost of £35k.  The report contained 29
recommendations detailing the actions required to improve and modernise the service and was presented to the Business Transformation Board
in May 2024.  £0.9M was allocated from transformation funding to engage an external delivery partner to support the required improvements
however, the Client Transport Project Board decided to utilise an internal delivery model to optimise costs and build and retain a strong
knowledge base within the Council.  BTSG approved for a Project Manager and a Project Support Officer to be appointed for an 18-month
delivery period at a budgeted cost of £262,800, substantially lower than the amount originally allocated from transformation funding, with the
Project Manager commencing soon afterwards and the Project Support Officer starting in February 2025.  The Client Transport Project Board is
made up of members of the senior leadership team from across all three directorates and the project plan and priorities are approved by this
Board.
Page 53 of 134

Page 54

Summary of key findings and recommendations
The following findings and recommendations are highlighted, which have all been agreed by Management:
• Detailed information was not provided to Financial Services to enable effective budget monitoring and forecasting to be undertaken which
contributed to the failure to accurately identify the large unforeseen overspend in Q4 of the 2024/25 financial year.  Purchase orders have
been piloted and rolled out for coach and mini-bus routes, providing some improvement in available financial forecasting data.  Additionally,
a spend analysis spreadsheet has been created for the new Transport Framework from August 2025 which will continue to be updated as
new routes are added, existing routes are changed, and this spreadsheet can be scrutinised by Financial Services at any time going
forward. 
• There has been a lack of monitoring of suppliers which has contributed to the consistent overcharging by a supplier over a 2-year period.
Monitoring processes have been established and will continue to be undertaken going forward.
• Prior to August 2025, invoice quality was poor as many suppliers did not quote a route number that matches the name of the route number
used by the Travel Team.  Management have developed appropriate monitoring processes for supplier invoices which have been in place
since August 2025 and will ensure that all suppliers adhere to the new requirements set out in the Code of Conduct and the Guidance for
Invoicing going forward.
• There was no Council policy in place for client transport and only Adult Social Care had a policy in place.  Management have established a
Council wide policy for client transport.
• Prior to August 2025, expired passenger transport framework contracts were utilised.  The new client transport procurement framework has
been awarded and the routes have been allocated to suppliers on the new framework.
• The recently approved Integrated Transport Policy includes the eligibility criteria, assessment process and appeal process however, it does
not clarify the authorisation arrangements for client transport and there is no other written procedure in place documenting this.  
Documented procedures will be prepared setting out the authorisation arrangements for client transport by 30 November 2025.
• As there was no transport policy in place, there is no detailed audit trail of formal ASN assessments for transport needs other than requests
for transport submitted to the Travel Team mailbox (financial year 2024/25).  Management will establish a formal annual process to review
the transport needs of all ASN pupils to support route planning by 30 June 2026.  Development of this is underway as part of the project.
• Although social work clients’ data is held in the Mosaic case management system, standard travel passports with information on the client’s
needs are not in place to assist with route planning.  A process will be developed for information to be provided to the Travel Team on social
work clients to support route planning by 30 June 2026.
• An annual confirmation with pupils’ parents/guardians to determine whether school transport is still required is not undertaken.  Appropriate
processes will be developed to confirm whether school pupils require transport to allow school routes to be optimised each year by 30 June
2026. Work on this is underway as part of the project. 
• There is no software solution in place to support the service or assist with route planning other than a number of different spreadsheets
developed by the team.  A system will be procured to assist in managing the service including route management by 30 June 2026.  Work
on this is underway as part of the project.
• A number of potential improvements to walking routes which would result in fewer pupils requiring transport were identified, but there has
not been a thorough analysis of these or presentation to the project board.  The improvements to walking routes will be reviewed, the cost
benefit / analysed, and the findings presented to the project board by 30 June 2026.
• There is no documented business continuity plan in place for the Travel Team, and members of the Travel Team are routinely providing
transport cover amongst their other duties leaving less time for supplier monitoring; the level of staffing in the Travel Team is lower than prior
years potentially putting service continuity at risk.  The level of resource allocated, and skills required to support the Travel Team achieving
its objectives will be reviewed and a business continuity plan prepared by 30 June 2026.
Page 54 of 134

Page 55

Recommendations
Grade 
High Medium Low Total
Current Report 1 20 4 25
Prior Report – February
2021
0 0 0 0
Materiality
The main client transport budgets for 2025/26 are as follows: 
Secondary Schools   £1,917,577
Special Schools & ASN  £1,568,631
ASC Learning Disabilities   £936,586
Primary Schools   £515,273
ASC Physical Disabilities   £80,000
Children’s Services (Disabilities)   £69,145
Children’s Services (Without Disabilities)   £76,338
Total £5,163,550 
The total equivalent budget for 2024/25 was £4.2M. 
Page 55 of 134

Page 56

Headlines
Objectives Conclusion Comments
1.   School and Social Work
Transport is only provided
when there is a requirement
in accordance with clear
and defined Council
Policies and legislation.  
2024/25 -
Limited
Assurance 
Until May 2025, there was no Council policy for client transport and only Adult Social Care had a
separate policy that formally set out the basis for transport provision.  The lack of a formal policy means
it is difficult to defend decisions made on client transport if a request for transport is rejected and
subsequently appealed.  The absence of an approved policy contributed to the overspend on client
transport in 2024/25 and prior years.  This issue has been addressed by the approval of the Integrated
Transport Policy on 20 May 2025.
2.  Clear and appropriate
procedures are in place
confirming who can
authorise school or social
work transport
requirements, on what
basis, and that these
procedures are always
adhered to.
2024/25
Limited
Assurance 
The Integrated Transport Policy provides an appropriate basis for client transport across the Council. 
The new policy does not clarify the authorisation arrangements for client transport and there is no
documented procedure to clarify this, however, Education management have advised that the new
process is understood by all relevant teams.  Adult Social Care and Children’s Services transport
arrangements are authorised as part of a package of care by the respective resource panels. 
Education management have advised that going forward, the central ASN team and Education
Resource Group will be the lead on reviewing new ASN transport requests and senior management will
also be required to authorise transport requests.  For mainstream Education, formal approval is rarely
required as the pupil’s distance from their catchment school is the primary criteria as to whether they
are eligible for transport.  It was noted that although procedures have been prepared for suppliers to
follow for onboarding, there are limited procedures in place for the Travel Team to follow for day-to-day
tasks.  
3.   Appropriate and
accurate route planning
arrangements are in place
to review transport needs
and provide best value for
the Council and contracts
are put in place using an
appropriate and compliant
procurement process.
2024/25
Limited
Assurance
There is no software solution in place to assist with route planning other than a number of different
spreadsheets developed by the team.  An annual confirmation with pupils’ parents/guardians to
determine whether school transport is still required is not undertaken.  Mini-bus and coach
requirements have been based on assuming transport provision continues for everyone provided,
which historically has resulted in overprovision and anecdotal evidence that some school buses are
operating with high numbers of empty seats.  There is no detailed audit trail of formal ASN
assessments of transport needs other than requests for transport submitted to the Travel Team. 
Similarly, there was no formal annual review of ASN transport against the policy (as there was no
policy); once ASN transport had been approved it had been assumed to be required indefinitely.   
Although a system was used this year to analyse walking routes and safe walking routes to ensure the
entitlement to school transport is accurate, the team only had short-term access to this system.  The
School Travel Plan Coordinator has highlighted a number of potential improvements that could be
made to walking routes which would result in fewer pupils requiring transport, but these have not been
formally reviewed and presented to the project board.  
Page 56 of 134

Page 57

Headlines
Objectives Conclusion Comments
Although processes are in place for Children’s Services and Adult Social Care to review travel needs,
travel passports with information on the client’s needs are not in place to assist with route planning for
social care.  For Education, Travel Passports were issued to schools in June 2025, with schools asked
to support parents/guardians in completing them for ASN pupils already receiving transport and this is
progressing.  
The previous framework for Home to School Taxi Services ended at the end of the school term in
2024/25, the previous Home to School Coach and Mini-buses framework ended in July 2024, and the
previous framework for Taxi Services for Social Care expired in July 2021.  Therefore, prior to August
2025 expired framework contracts were being used.  The Project Team and the Travel Team have
successfully retendered all client transport services this year and reallocated the routes.
The Travel Team have advised that pupil number data is not received from Education until July each
year, which leaves limited time to optimise routes prior to schools recommencing.
4.  Appropriate processes
are in place to monitor and
forecast expenditure for the
year, both initially and when
changes are made and that
they are allocated to the
appropriate Council
budgets. 
2024/25
No
Assurance 
In 2024/25 the Passenger Transport project was at an early stage and no substantive changes had
been made to the service, therefore no savings should have been anticipated.  For 2025/26, the budget
has been increased by £1M to £5.2M.  
An overspend of £1.677M was reported to June 2025 Council and it was stated that this was due to the
volume and value of school pupil transport invoices being higher than budgeted (£714k higher than the
projected overspend of £963k reported to February 2025 Council).  Similarly, for 2023/24, an
overspend of £1.2M was reported to June 2024 Council and a projected overspend of £1M was
reported to February 2024 Council.  Although the non-devolved ASN budget was exceeded by £886K
in 2023/24 with an outturn of £1.59M, the ASN budget for 2024/25 was originally set at £705K
(subsequently revised to £1M).  
Page 57 of 134

Page 58

Following the departure of key staff from the Travel Team in 2022, detailed transport information was
not provided to Financial Services to enable effective monitoring to be undertaken.  Education offered
to temporarily administer the processing of Education transport invoices on behalf of the Travel Team
from August 2022 while they transitioned to new staffing and processes.  In order to do this efficiently,
Education developed a spreadsheet detailing the names of the suppliers, the route names, the number
of school days and the cost per day, cost centres, invoice details and amounts, and enabled
identification of variance and forecasting of costs within the academic year.  Financial Services were
not aware that Education had developed these spreadsheets and if they had been, the overspend
could have been predicted with more accuracy.  Senior Finance Business Partners met regularly with
senior management but had limited contact with the Travel Team.  Forecasting information was based
on reviewing actual spend and was not informed by increases in the number of ASN pupils receiving
transport, changes to timetables and contracts.
For mainstream Education transport, a change was made to the timetabling of buses for secondary
schools in 2024 effective from Q2 due to the alignment of the school day for secondary schools.  In
2023/24 and previous years, some bus providers were doubling up routes, but for the new academic
year routes were reallocated via a mini-competition and this practice ceased resulting in a better
service for schools and school pupils, addressing the issue of buses picking up and dropping off when
school buildings were not open which is a pupil safety issue. However, this change resulted in more
buses running and higher costs for the Council.  The financial impact of this change was not reported
as part of the budget monitoring in 2024/25.  
From January 2025, Mayfield Primary School was decanted, and emergency temporary transport was
arranged for all pupils impacted by this.  This additional transport also contributed to the higher-than-
expected costs for 2024/25; the financial impact of this change was not reported as part of the budget
monitoring in 2024/25.  
Between March 2024 and March 2025, the number of routes on the Education Invoice Breakdown
Spreadsheet increased by 32 primarily driven by more ASN taxi transport.  As the school year
progressed from August 2024, new ASN routes were added contributing to invoice costs for Q4 being a
further 18% to 22% higher than Q2 and Q3 respectively.  
The processing of invoices has been passed back to the Travel Team, with new improved processes in
place for coaches and mini-buses, with support and instruction given on the process and spreadsheet
developed by Education.
From August 2025, purchase orders have been piloted and rolled out for coach and mini-bus routes,
providing some improvement in available financial forecasting data.  Management have advised that a
spend analysis spreadsheet has been created for the new Transport Framework from August 2025
which will continue to be updated as new routes are added, existing routes are changed, and that this
spreadsheet can be scrutinised by Financial Services at any time going forward.
Page 58 of 134

Page 59

Headlines
Objectives Conclusion Comments
5.  Appropriate processes
are in place to monitor that
services are provided in line
with the contracted service
and that invoices are paid
in a timely manner when
they are accurate and in
accordance with the
contracted service that has
actually been provided.
2024/25
Limited
Assurance 
There has been a lack of monitoring of suppliers which has contributed to the consistent overcharging
by a supplier over a 2-year period - the issue was only identified following complaints from pupils and
parents, not from internal monitoring processes.  Prior to August 2025, no usage monitoring information
was received from coach and mini-bus companies and prior to the new tender, supplier onboarding
procedures were weak.   
There is no business continuity plan in place for the Travel Team, and members of the Travel Team are
routinely providing transport cover amongst their other duties leaving less time for supplier monitoring;
the level of staffing in the Travel Team is lower than prior years.  Management have advised that they
intend to review the resource allocated, and skills required to support the Travel Team.
Prior to August 2025, invoice quality was poor as many suppliers did not quote a route number that
matches the name of the route number used by the Travel Team.  Although a register is in place with
the names of all individuals receiving taxi transport, reconciling this is complex.  The Transport Invoice
Breakdown Spreadsheet developed by Education provided some assurance that changes month to
month were able to be queried, and any differences could be queried with the Travel Team to ensure
that any changes were legitimate, however, reconciliation is still complicated as route numbers are
often not provided on invoices by suppliers.   A rota spreadsheet showing current clients, addresses,
contact details, suppliers, and daily costs was in place for ASC and this was shared with the Travel
Team, but as noted above there were no route references on this spreadsheet making reconciliation
complicated depending on the information provided on the supplier invoice.  As part of the revised
framework tender, detailed onboarding procedures have been prepared for all providers.  All transport
providers now have to agree to a Code of Conduct, guidance has been prepared on invoicing
standards, all suppliers are provided with a route reference to quote on their invoice, and guidance has
been provided on safeguarding responsibilities.  Additionally, purchase orders are in place covering the
entire year for mini-bus and coach providers, providing improved certainty over the level of spend for
these suppliers.
The updated onboarding arrangements put requirements on all coach and mini-bus providers to
provide reports detailing passenger volume along with each invoice.  By monitoring the uptake of pupil
transport, there may be scope to reduce the number or sizes of buses used in future if uptake is lower
than expectations.  Taxis are not required to provide any monitoring information but are now obligated
to carry out a meet and greet with parents/guardians at the start of each school term.
Page 59 of 134

Page 60

Areas where expected controls are met/good practice 
No. Areas of Positive Assurance
1 An external consultant undertook a review of the Council’s client transport services in 2024 and highlighted the majority of the key issues
for the service.  Senior Management are aware of the improvements required to the service and these are being actively delivered
through the Client Transport Project.  A Project Team is in place that is well informed of the improvements required and actions are being
progressed to further improve the service.  
2. A Client Transport Board is in place with appropriate governance arrangements, senior management representation and regular
reporting.  The Senior Project Manager provides regular update reports, and the prioritisation of activities and project plan are approved
by the Client Transport Board.
3. A number of milestones have been achieved by the Project Team including the approval of the Integrated Transport Policy; the awarding
of a new client transport framework; and the allocation of routes to new providers.  A Policy Working Group has been established who
will meet annually, or at earlier intervals if required, to ensure the Policy remains fit for purpose.
4. As part of the new client transport framework, detailed onboarding procedures have been prepared for suppliers to follow which includes
a requirement to agree to a Code of Conduct, follow guidance on invoicing standards and guidance on safeguarding responsibilities.  
5. Serious Organised Crime Procurement Checks have been completed for all suppliers.
6. Monitoring of passenger numbers has been introduced as a mandatory requirement for all coach and mini-bus suppliers.  The new
framework also presented an opportunity to reinforce standards - all suppliers have provided evidence of licences and insurance.
7. From August 2025, purchase orders have been piloted and rolled out for coach and mini-bus routes, which will help in providing
improved assurance.  
8. The central ASN team and Education Resource Group now lead on reviewing new ASN transport requests and senior management are
also required to authorise transport requests, ensuring that there is appropriate senior management oversight of new ASN transport in
line with the requirements detailed in the Integrated Transport Policy.
9. A spend analysis spreadsheet has been created for the new Transport Framework from August 2025 which will continue to be updated
as new routes are added, existing routes are changed, and this spreadsheet can be scrutinised by Financial Services at any time going
forward.
10. Travel Passports have been implemented for Education, and work on rollout and uptake is continuing.  
11. A Microsoft365 form has been implemented for schools to request ad-hoc bookings, ensuring the Travel Team co-ordinate all transport
and avoids schools booking suppliers not on the Council’s framework.
Page 60 of 134

Page 61

Recommendation Grading/Overall Opinion Definitions 
Recommendation Definition
High
Recommendations relating to factors fundamental to the success of the control objectives of the system. 
The weaknesses may give rise to significant financial loss/misstatement or failure of business processes.
Medium Recommendations which will improve the efficiency and effectiveness of the existing controls.
Low
Recommendations concerning minor issues that are not critical, but which may prevent attainment of best
practice and/or operational efficiency.
Levels of Assurance Definition 
Substantial Assurance A sound system of governance, risk management and control exists, with internal controls operating
effectively and being consistently applied to support the achievement of objectives in the area audited.
Reasonable Assurance
There is a generally sound system of governance, risk management and control in place. Some issues,
non-compliance or scope for improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited Assurance
Significant gaps, weaknesses or non-compliance were identified. Improvement is required to the system of
governance, risk management and control to effectively manage risks to the achievement of objectives in
the area audited.
No Assurance
Immediate action is required to address fundamental gaps, weaknesses or non-compliance identified.
The system of governance, risk management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
Page 61 of 134

Page 62

Page 62 of 134

Page 63

Appendix 1. Executive Summary: Foster Care and Adoption
Conclusion: Limited Assurance
Policies and procedures are in place for foster care and adoption and segregation of duties for the payment of allowances and fees are in
place.  However, 13 overpayments amounting to £150K have occurred and invoices have not yet been raised for 7 of the overpayments,
adoption cases have not been reviewed for any of the cases tested, rates input to Mosaic were incorrect for some elements and the setting of
rates for adoption allowances was unclear.  A small number of incorrect payments have been identified. 
Background
Mosaic is the Council’s Social Care system used to record information and process payments - there is an automated interface enabling
authorised payments from Mosaic to be uploaded into Integra (the Council’s finance system). In August 2023, the Scottish Government
introduced the Scottish Recommended Allowance (SRA) for foster carers and there are 16 key components which the allowance should cover. 
A foster fee is also paid to carers for each young person in their care. The Council has a policy on the Post Adoption Support Planning and
Adoption Allowance scheme and this states that the Council must consider whether an adoption allowance may be paid for any children whose
adoption it is arranging or has been arranged, before an adoption order is made. 
Summary of findings & recommendations
The following key findings and recommendations are highlighted, which have all been agreed by Management:
• 13 overpayments amounting to £150K were identified by management. 5 overpayments in relation to adoption cases were highlighted
before the audit commenced and it was reported that these occurred due to no end dates for adoption allowances being input in the
system.  There has been minimal recovery of the overpayments.  Management have already changed the process to add end dates and
will review all cases and take appropriate action by 31 December 2025.  
• Testing of a sample of 6 adoptions highlighted that reviews had not taken place since the adoption allowances were awarded. 
Management have agreed to ensure that processes are in place to ensure that timely reviews are completed by 31 December 2025.
• Incorrect rates had been input into Mosaic for some elements of the foster allowances and fees and the rates for adoption allowances and
exceptional fees within the Mosaic system could not be clarified as there is no evidence / audit trail detailing what the adoption allowance
rates should be (these do not mirror the foster allowance as per the Adoption Policy).  Management in Children’s Services and Operational
Support will ensure going forward that all rates are agreed through the Council’s MTFP.  Complete.
• A small number of incorrect payments have been identified including a duplicate payment of £669. Management advised this will be
rectified and the overpayments will be reclaimed by 31 December 2025. 
Recommendation Summary 
Recommendations Grade  High Medium Low Total
Current Report 0 5 8 13
Prior Report  N/A N/A N/A N/A
Materiality
In 2024/25 expenditure for foster carer fees and allowances was
£2,709,255 and expenditure for adoption allowances and
exceptional fees was £148,207.
15 adoption allowances and 3 adoption exceptional fees were paid
out and 67 children were in foster care (as at 30 June 2025). 
Page 63 of 134

Page 64

Headlines
Objectives Conclusion Comments
1.   Adoption and Fostering
assessments and approvals
are determined by clear
policies, procedures, guidance
and are in line with best
practice, relevant regulations
and legislation.
Reasonable Adoption and Fostering assessments and approvals are documented in the panel minutes.
Policies and procedures for fostering and adoptions are in place which are in line with best
practice, relevant regulations and legislation. 
In 2022, the Council paused recruiting new adopters however the service continued to support
existing adopters and utilised external adoption agencies.  The Council has started recruiting
new adopters but, in some cases, may still use external agencies. 
Post adoption allowances were updated on 1 April 2023 however these were not presented to
Council for approval and there is no evidence or audit trail detailing what the adoption allowance
rates should be - the Council’s Post Adoption Policy states that the rate paid is normally the same
as the foster allowance however the amounts paid do not reflect this. 
2.  Agreements are in place
with all adopters and foster
carers, clearly outlining the
roles and responsibilities of
both carers and the Council.
Reasonable Testing of a sample of 6 adoptions highlighted that adoption support plans were not in place for 2
adoptions.   Management advised that adoption support plans may not have been a requirement
at the time the adoption was made and the requirement to complete these is in place for all new
adoptions.  Testing of a sample of 10 foster carers confirmed that agreements were in place
however it was not always clear who had completed the foster carer agreement, and it was not
always signed by the Director/Chief Officer.
3.   All adoption allowances and
payments to foster carers are
paid at the appropriate rates
and are supported by
authorised purchase orders.
Limited A small number of incorrect payments have been identified including a duplicate payment of £669.  
Foster allowances were updated in Mosaic in accordance with the national rates however a
lesser amount has been input for the birthday and Christmas allowances as instructed by
Children’s services management which has led to smaller payments than indicated in the current
Council guidance.  Although the correct overall foster care allowance fee has been input, there is
no audit trail detailing how the weekly components are calculated (for maintenance, pocket
money and clothing) on Mosaic.  
Foster fees were updated in April 2025 and were approved by Council.  However, testing
identified that the rates for foster fees level 2 for respite had not been updated - this has now
been rectified.  It was also noted that sample checks on payments are not undertaken.  The
short break policy needs to be reviewed to clarify what payments should be paid to carers for
foster respite and what deductions should be made from the original carer during the short
break.
Page 64 of 134

Page 65

4. Appropriate validation and
authorisation arrangements are
in place for all adoption and
fostering care payment runs,
payments are only made to
approved carers; and are only
made for periods when the
young person is with the carer. 
Limited • Appropriate validation and authorisation arrangements are in place for payment runs.  However,
13 overpayments amounting to £150K were identified by management. 5 overpayments in
relation to adoption cases were highlighted before the audit commenced and it was reported that
these occurred due to no end dates for adoption allowances being input in the system and
reviews not being undertaken.
As at September 2025, from the 13 overpayments identified: 7 invoices had not been raised; 2
invoices have been raised; a payment plan is in place for 1 service user; 2 cases are being
reviewed with the Council’s legal team (1 case recently discussed setting up a payment plan);
and 1 overpayment (£1.5K) has been written off by senior management due to administration
errors within the service.  
• Testing highlighted that although end dates were recorded on the system for adoption
allowances, there were no end dates for foster care packages on the Mosaic system which
increases the risk of overpayments.  
5.  Regular reviews of carers
agreements between
Midlothian Council and carers
are undertaken to ensure that
payments being made to
adoption and foster carers
remain valid.
Limited Foster carers are reviewed at least every two years which includes undertaking statutory checks
such as medical and disclosure checks.  In addition, annual checks are also undertaken by the
team leaders. All 10 foster carers reviewed complied with this however some records require
updating.  
The Post Adoption Policy states that reviews for adoption allowances should be undertaken at a
minimum of two years following implementation. A sample of 6 adoptions was tested however no
reviews had been undertaken after the adoption allowances were granted.  
6.  Adequate budgetary
management arrangements are
in place for expenditure on
adoption and fostering care.
Reasonable  • Budget monitoring for Fostering and Adoption is undertaken monthly however, due to the issues
identified during the audit, a more detailed analysis needs to be undertaken as part of this
process. 
Page 65 of 134

Page 66

Areas where expected controls are met/good practice 
No. Areas of Positive Assurance
1. All foster carer agreements were in place and improvements were made to the template during the audit review. 
2. A Foster Care Handbook is in place which provides key information on foster care, including the legal basis for caring for children, foster
carer approval, paperwork, agreements and financial information.  Fostering Household Safer Caring guidance is also in place. 
3. Appropriate validation and authorisation arrangements are in place for all payment runs.  Segregation of duties is in place within Children
Services when a service request is raised by an officer and approved by the team leader.  Segregation of duties is also in place within
the Operational Support team when purchase orders are raised and approved. 
4. As part of the foster carer reviews, regular statutory checks such as medical and disclosure checks are undertaken.  Audit checks are
undertaken by team leaders to ensure case files are updated. 
5 A policy is in place for the Post Adoption Support Planning and Adoption Allowance scheme which highlights how the Council
supports young people who have been adopted. The policy states that allowance rates for adopters are determined by a financial
assessment however will generally follow the standard foster allowances less child benefit payable for the age of the child (the rates
paid do not reflect this in practice). 
Page 66 of 134

Page 67

Recommendation Grading/Overall Opinion Definitions
Recommendation Definition
High
Recommendations relating to factors fundamental to the success of the control objectives of the system.
The weaknesses may give rise to significant financial loss/misstatement or failure of business processes.
Medium Recommendations which will improve the efficiency and effectiveness of the existing controls.
Low
Recommendations concerning minor issues that are not critical, but which may prevent attainment of best
practice and/or operational efficiency.
Levels of Assurance Definition 
Substantial Assurance A sound system of governance, risk management and control exists, with internal controls operating
effectively and being consistently applied to support the achievement of objectives in the area audited.
Reasonable Assurance
There is a generally sound system of governance, risk management and control in place. Some issues,
noncompliance or scope for improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited Assurance
Significant gaps, weaknesses or non-compliance were identified. Improvement is required to the system of
governance, risk management and control to effectively manage risks to the achievement of objectives in
the area audited.
No Assurance
Immediate action is required to address fundamental gaps, weaknesses or non-compliance identified.
The system of governance, risk management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
Page 67 of 134

Page 68

Page 68 of 134

Page 69

Audit Committee         
Tuesday 2 December 2025
Item No 5.3 
Follow-Up Review of Completed Internal Audit Recommendations and
Progress Update 
Duncan Stainbank, Chief Internal Auditor 
Report for Decision 
1 Recommendations
The Audit Committee is asked to:
a) Note the results from the sample check of Internal Audit
recommendations that have been marked as completed by
Management since the last review to improve internal controls and
governance, and mitigate risks; 
b) Acknowledge the progress made by Management in implementing
Internal Audit recommendations to improve internal controls and
governance, to mitigate risks, and consider whether it is satisfied with
the progress made by Management;
c) Considers whether it is satisfied with the outcomes or whether any
further action is required;
d) Endorse the proposal to extend the due dates for the overdue
recommendations; and 
e) Note that Internal Audit will continue to monitor for completion the
outstanding recommendations and will provide update reports to the
Audit Committee. 
2 Purpose of Report/Executive Summary 
The purpose of this report is to provide an update to members of the
Audit Committee on the results of the Internal Audit Follow-up review
which included a sample check on the adequacy of new internal
controls for Internal Audit recommendations marked as completed by
Management in the period August 2024 to September 2025. 
This report also provides an update to members of the Audit Committee
on the status of the implementation by Management of audit
recommendations made and agreed in Internal Audit reports. 
Internal Audit is an independent appraisal function established for the
review of the internal control system as a service to Midlothian Council. 
It objectively examines, evaluates and reports on the adequacy of
internal control as a contribution to the proper, economic, efficient and
effective use of resources and the management of risk. 
The Internal Audit activity adds value to the organisation (and its
stakeholders) when it considers strategies, objectives, and risks; strives
to offer ways to enhance governance, risk management and control
Page 69 of 134

Page 70

processes (by way of making audit recommendations); and objectively
provides relevant assurance. 
The remit of the Audit Committee includes “To consider reports on the
effectiveness of internal controls and monitor the implementation of
agreed actions”, as part of its high-level oversight of the Council’s
governance, risk management and control framework. 
Date 18 November 2025 
Report Contact:
Duncan Stainbank
Chief Internal Auditor  
duncan.stainbank@midlothian.gov.uk 
Appendix 1: Overdue Actions 
Appendix 2: ‘In Progress’ Actions
Page 70 of 134

Page 71

3 Background 
3.1 Internal Audit is an independent appraisal function established for the
review of the internal control system as a service to Midlothian Council. 
It objectively examines, evaluates and reports on the adequacy of
internal control as a contribution to the proper, economic, efficient and
effective use of resources and the management of risk. 
3.2 The Internal Audit activity adds value to the organisation (and its
stakeholders) when it considers strategies, objectives, and risks; strives
to offer ways to enhance governance, risk management and control
processes (by way of making audit recommendations); and objectively
provides relevant assurance. 
3.3 Management has the responsibility for ensuring that agreed audit
actions are implemented to improve internal controls, risk management
and governance. At Internal Audit final report stage, the audit
recommendations are input to Ideagen Risk Management system, the
Council’s corporate performance management system. This is designed
to assist with Management tracking of implementation, link with relevant
risks and evidence improvement. 
3.4 Each year, Internal Audit undertakes two follow up reviews on the
recommendations it has raised. The first checks a sample of Internal
Audit recommendations which have been reported as complete and
reviews the adequacy of the actions taken and improvements made.
The second reports on the progress Management have made in
implementing the recommendations by the expected date. 
3.5 The remit of the Audit Committee includes “To consider reports on the
effectiveness of internal controls and monitor the implementation of
agreed actions”, as part of its high-level oversight of the Council’s
governance, risk management and control framework. 
4        Review of Completion of Internal Audit Recommendations 
4.1 The objective of this follow-up audit was to review a sample of Internal
Audit recommendations that have been signed off by Management as
complete during the period 1 August 2024 to 30 September 2025 to
assess the evidence that recommendations have been implemented
satisfactorily and to ensure that the new controls had the desired effect
on improving internal control and governance and reducing risk. 
4.2 A sample of 51 audit recommendations which were at the ‘completed’
status on the Ideagen Risk Management system were selected and
evidence was obtained to support the satisfactory completion of each
recommendation. Recommendations from the following Internal Audit
reports were selected: 
Page 71 of 134

Page 72

Financial
Year
Internal Audit Report  No. High
Rated
Medium
Rated
Low
Rated
Consultancy
– Not Rated
2019/20 Electric Payments
Systems
1 0 0 1 0
2020/21 Trading Standards 2 0 1 1 0
2020/21 Social Housing Rents 1 0 0 1 0
2022/23 Accounts Receivable –
Sundry Debt
1 0 0 1 0
2022/23 Care at Home 4 0 1 3 0
2022/23 Information Governance 1 0 1 0 0
2022/23 Street Lighting 3 0 2 1 0
2022/23 Utilities: Energy and
Water Consumption
4 0 1 3 0
2023/24 Absence and
Performance
Management
4 0 2 2 0
2023/24 Bowles Report – School
Capacity
4 0 0 0 4
2023/24 Council Tax Discounts
and Exemptions
1 1 0 0 0
2023/24 Developer Contributions 2 0 1 1 0
2023/24 Education Software 5 0 2 3 0
2023/24 Licensing 6 0 1 5 0
2023/24 Payroll 2 0 0 2 0
2023/24 Risk Management 1 0 1 0 0
2024/25 Midlothian Energy 6 0 2 4 0
2024/25 Revenue Budget
Monitoring
3 0 1 2 0 
Total 51 1 16 30 4 
4.3 From the 51 recommendations tested, 37 (72.5%) were found to have
been completed satisfactorily, and 14 (27.5%) were identified as
requiring further work to bring the audit action to full completion. 
4.4 For the audit recommendations that had been completed satisfactorily,
the evidence that was provided by Management indicated that the
action taken had the desired effect on improving internal control and
governance and reducing risk. 
4.5 For the 14 audit recommendations identified as requiring further work: 8
were Low-rated, 5 were Medium-rated, and one was not given a priority
rating at the reporting stage as it related to audit consultancy work. The
further work required for the 14 recommendations is detailed in the
table below. 
Audit Recommendation Rating Further Work Required
1 Street Lighting When calculating Performance Indicators
the following should be implemented:
retain an audit trail of source
documentation for reported PIs; create
procedure notes to enable indicators to
be produced in the absence of key
individuals; undertake QA checks
Medium Although it was evidenced that processes have
improved, particularly through completion of the
other 2 Street Lighting actions confirmed as fully
complete as part of this follow-up review, a
procedure note has not yet been drafted for
Performance Indicators. 
2 Utilities:
Energy and
The rates applicable for electricity
generated by the Council’s solar panels
should be obtained annually from the
Low The rates applicable are now obtained annually,
however the issue of the low electricity
Page 72 of 134

Page 73

Audit Recommendation Rating Further Work Required
Water
Consumption
provider. Additionally, the low electricity
generation noted from a sample of
panels should be reviewed and rectified
as required.
generation of the solar panels at Lasswade High
School has not yet been addressed.
3 Utilities:
Energy and
Water
Consumption
Following the pilot exercise being
undertaken for Fairfield House and
Midlothian House, a longer-term plan for
improving building efficiency and
reducing utilities usage across the
Council estate should be developed.
Medium Management have advised that they have
obtained approval to appoint an Energy
Management Officer charged with making
savings through improved management and
control of systems.  This post, although
approved, has not been advertised yet, and
management have not provided Internal Audit
with a plan for improving building efficiency and
reducing utilities usage; management have
advised that developing such a plan will be a
responsibility of the new post.
4 Absence and
Performance
Management
The Maximising Attendance at Work
policy should be reviewed and updated to
reflect the audit findings.
Low Some of the audit findings, including clarifying
the absence trigger levels (i.e. whether it is 8
separate or continuous working or calendar
days), referencing to the Time off Policy 2024
where relevant, or detailing the retention period
of attendance management records, were not
included in the latest policy update.
5 Bowles Report
- School
Capacity
The catchment area for each
development should be added to the
Housing Data Main Schedule
spreadsheet using the ARC GIS system
before this is sent to Education.
Not Rated The audit action was closed following the
establishment of fortnightly meetings with
Education to take them through the consultation
responses that they had received from Planning.
These meetings ran for a few months in 2024
(providing Education with information on
location, phasing, and build rates), but the
meetings stopped after this, reportedly due to
the meetings being repeatedly missed by
Education due to other commitments.  Education
have advised that they would like further support
from the Planning Service, particularly in relation
to the catchment area for new developments. 
Internal Audit have suggested this could be
achieved by providing Education with an
information pack with detailed information on
any potential school location and the catchment
area of all new residential developments going
forward.
6 Developer
Contributions
Consideration should be given to
establishing a Developer Contribution
Steering Group to allow for additional
reporting in the year given the high
financial value and importance of this
area.
Low Although a short-life working group on
Developer Contributions carried out some work
in early 2025, particularly on the use of
contributions nearing their expiry date, the
Capital Plan & Asset Management Board have
not yet formally considered whether such a
group should be made permanent.
7 Education
Software
Guidance for DPIAs should specify the
authorisation and segregation
requirements, final versions submitted to
the DPO, the timescales for update, the
requirement to report to the ICO if
necessary, and a process developed to
follow-up DPIA actions.
Low The latest version of the DPIA template has not
yet been updated to detail the authorisation or
segregation of duties requirements for DPIAs.
8 Education
Software
DPIAs identified as not being fully
complete or with actions outstanding,
should be completed.   Appropriate
monitoring and governance
arrangements should be established  to
ensure the need for a DPIA is promptly
identified going forward.
Low The six applications with potential issues with
their DPIAs was discussed with the Council’s
Information Compliance Officer.  For 1 of the
applications no further action is required, but
further work is required to check the status of
the other 5 DPIAs.
9 Licensing Management should ensure the
Licensing Forum is reconvened to ensure
it is fulfilling its statutory duties.
Consideration should be given as to how
to manage potential conflicts of interest in
Low Although the first meeting of the reconvened
Licensing Forum was arranged for September
2025, it did not go ahead due to there being
insufficient trade representatives. 
Page 73 of 134

Page 74

4.6 Discussions have been held with the action owners to highlight what is
required to ensure the remaining elements of the audit actions are fully
completed or a sustained control is established. 14 audit actions have
been re-opened on the Ideagen Risk Management system to enable the
recommendation to be completed by the new agreed action date with
evidence of the improvement action undertaken. 
5 Progress Update 
5.1  The objective of the second review is to assess Management’s reported
performance in closing actions raised by Internal Audit by the agreed
due date. It is Management’s responsibility to design and maintain
adequate risk management, governance and internal control processes
and checking that the arrangements and controls are operating
effectively which are also known as the first and second lines. The 
Audit Recommendation Rating Further Work Required
terms of Protective Services coordinating
the Licensing Forum.
10 Licensing Procedures should be developed for all
licences issued by the Council and risk
registers should be updated.
Low The Team Manager – Health Safety and
Resilience advised that procedures have not yet
been updated, but these will be updated as the
project to move all the Council’s licence
applications to the Granicus system, so they are
available online, continues.  
11 Licensing Application forms should be updated with
the Council’s Privacy Policy and should
be available online for all licences.
Low The licence applications have been updated with
the Council’s Privacy Policy.  However, a
number of licence applications are still not
available online and applicants are instead
required to email the Licensing Team to receive
the relevant form, including for HMOs, private
hire, taxis, alcohol premises, alcohol personal
licence, and extended hours licence. 
12 Licensing The role of the Civic LSO should be
delivered and adequate resource
allocated to licensing monitoring and
administrative support.  The scheme of
delegation should be updated to include
the LSO for the Civic Government
(Scotland) Act 1982 and the LSA 2005.
Medium Management have reported that an appropriate
officer has been given the responsibility of Civic
LSO.   
However, full completion of this action requires
an update to the Council’s Scheme of
Delegation.  The action will be reassigned to the
appropriate officer with responsibility for the
update of the Scheme of Delegation.
13 Risk
Management
Appropriate risk management training
and support should be provided to
management including creating an e-
learning module, mandatory for relevant
managers, and ongoing periodic 1 to 1
support to facilitate update of their risk
registers.
Medium A risk management course has been created
and is available on the Council’s Learnpro
system, but the course has not been
appropriately promoted and to date has only
been completed by 7 officers; none of these
officers are senior managers with responsibility
for their own service risk registers.
14 Midlothian
Energy
The Business Plan reported to Council
should include all of the requirements
detailed in the Shareholders Agreement
including presentation of MEL’s annual
audited accounts.
Medium Some aspects of this recommendation were
addressed when the business plan was last
presented, but due to the timing of the audit
recommendations (the report was issued in final
in October 2024) and the timescales for
preparing the new business plan some aspects
of the recommendation were not included (e.g.
financial forecast information including a
projected Profit and Loss and Balance Sheet
and financial variance reporting).  It was
discussed with management that there may be a
benefit to report some of this information in a
separate report due to the timing of the year-end
for Midlothian Energy (31 December each year).  
Page 74 of 134

Page 75

quarterly performance monitoring process provides an opportunity for
Management to have a discussion on all of the open audit actions,
including those that are overdue, the reasons why they were not
completed by the original due date, risk mitigations in place in the
interim and requests to Internal Audit for extensions to due dates. 
5.2    An Internal Audit action report was generated from the Ideagen Risk
Management system on 14 November 2025 which reflected the Quarter
2 updates 2025/26. 39 actions were overdue, and 113 actions
(including sub-actions) were in progress which are summarised as
follows:   
Financial
Year
Action
Status
High Medium Low Total
2018/19 In Progress 2 1 0 3
2019/20 In Progress 0 1 2 3 
Overdue 0 0 1 1
2020/21 In Progress 2 2 1 5
2021/22 In Progress 1 7 3 11 
Overdue 0 1 4 5
2022/23 In Progress 0 5 5 10 
Overdue 0 4 1 5
2023/24 In Progress 0 15 13 28 
Overdue  0 11 3 14 
In Progress Priority not given as
consultancy for 5 actions
1
Overdue 4
2024/25 In Progress 4 14 12 30 
Overdue 0 1 7 8
2025/26 In Progress 0 7 15 22 
Overdue 0 1 1 2
Total  9 70 68 152 
5.3 The 39 overdue actions are summarised in Appendix 1. The due dates
for these are now to be extended to 31 March 2026 in the Ideagen Risk
Management system, which will allow management to take further
action to complete the recommendations within a reasonable time. CMT
are in support of this proposal and the Audit Committee are asked to
endorse this proposal.   
5.4     The 113 audit actions in progress are summarised in Appendix 2 which
highlights the number of audit actions in progress within each
Directorate. 
5.5  This report was prepared for presentation to the Audit Committee on 2
December 2025. The progress on implementation of Internal Audit
recommendations has been discussed with the Corporate Management
Team on 19 November 2025. 
5.6      A further update on progress with the implementation of Internal Audit
recommendations will be included within the Internal Audit Annual
Assurance Report 2025/26 for Midlothian Council which is scheduled
for presentation to the Audit Committee in June 2026. 
Page 75 of 134

Page 76

6    Report Implications (Resource, Digital, Risk and Equalities) 
6.1 Resource 
Resource implications of implementing Internal Audit recommendations
are considered as part of the audit process to ensure these are
reasonable and proportionate to the risks. 
6.2 Digital 
There are no digital implications arising from this report. 
6.3 Risk 
The recommendations made by Internal Audit are designed to reduce
the level of risk to which the Council is exposed through the
strengthening of the control environment and management of risks. 
It is anticipated that improvements in the management and mitigation of
risks will arise as a direct result of Management implementing the
Internal Audit recommendations made. If audit recommendations are
not implemented, there is a greater risk of financial loss and/or reduced
operational efficiency and effectiveness, and Management may not be
able to demonstrate improvement in internal control and governance
arrangements, and effective management of risks. 
6.4 Ensuring Equalities 
This report does not relate to a new or revised policy, service or budget
change, which affects people (the public or staff), so an Integrated
Impact Assessment (IIA) is not an applicable consideration. 
The Internal Audit work is carried out in accordance with the appropriate
legislation and professional standards. The latter includes compliance
with the requirements of Global Internal Audit Standards Domain 2
Ethics and Professionalism. 
6.5 Additional Report Implications (See Appendix A)
Page 76 of 134

Page 77

APPENDIX A – Additional Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Although this report does not relate directly to the key priorities within
the Single Midlothian Plan to which Midlothian Council and its
Community Planning Partners have made a commitment (Reducing the
gap in economic circumstances; Reducing the gap in learning
outcomes; Reducing the gap in health outcomes; and Reducing the
impact of climate change), good governance is important to enable
Midlothian Council to deliver its key priorities in support of achieving the
Council’s objectives. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working  
Hub and Spoke  
Modern  
Sustainable  
Transformational  
Preventative  
Asset-based  
Continuous Improvement  
One size fits one 
None of the above 
Midlothian Council is committed to creating a great place to grow
supported by the 9 drivers for change. Implementing the 9 drivers for
change in practice is applicable to the Council’s Internal Audit service
provision to assist the Council in achieving its objectives. 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you  
Preventative and Sustainable  
Efficient and Modern  
Innovative and Ambitious 
A.4 Delivering Best Value 
The purpose of Internal Auditing within Global Internal Audit Standards 
(GIAS) is that “Internal auditing strengthens the organisation’s ability to
create, protect, and sustain value by providing the board and
management with independent, risk based, and objective, assurance,
advice, insight, and foresight.” 
Implementation by Management of the actions associated with Internal
Audit recommendations, that are designed to improve internal control
and governance arrangements and management of risks, underpins the
Page 77 of 134

Page 78

Council’s own continuous improvement arrangements to enhance its
effectiveness, thus supporting the delivery of the Council’s best value
duties. 
A.5 Involving Communities and Other Stakeholders 
The Chief Internal Auditor is accountable to the Audit Committee which,
in fulfilling its governance role, acts as a bridge between the Council
and other stakeholders. This report is presented to the Audit Committee
to fulfil its remit “monitor the implementation of agreed actions”, as part
of its high-level oversight of the Council’s governance, risk management
and control framework. 
This report has been presented to the Corporate Management Team to
outline the key messages of assurance and areas of improvement. The
implementation of Audit recommendations will continue to be tracked by
Management using the Ideagen Risk Management system and
followed-up by Internal Audit. Any further matters of concern will be
raised to CMT and the Audit Committee as appropriate. 
A.6 Impact on Performance and Outcomes 
The Findings and Recommendations from Internal Audit work during
the year are designed to assist the Council in improving its performance
and outcomes. 
A.7 Adopting a Preventative Approach 
Internal Audit assurance work includes assessments on when a
preventative approach can be adopted. 
A.8 Supporting Sustainable Development 
This report does not relate directly to supporting sustainable
development. Good governance is important to enable Midlothian
Council to achieve its objectives. 
Page 78 of 134

Page 79

Appendix 1
Internal Audit Performance Report – Overdue Actions 
Status: Overdue 39  
2019/20 - Asset Registers - Substantial Assurance in terms of accuracy of main registers and insurance arrangements.  Limited Assurance in terms of utilisation reporting,
low value plant, and some improvements noted as required for asset disposal. 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.AREG.02
Improve and consolidate road and footpath asset
management data in Confirm system, and improve
the referencing to road adoption / acquisition
documentation.
30-Apr-
2025  20%
Q2 25/26: In progress 
A digital transformation steering group has
been established with membership drawn
from Digital Services and Business
Applications. There have been a number of
demos for asset management systems and
applications for Neighbourhood Services.
However, Digital Services are currently
working to create and develop a road map
which will allow Neighbourhood services to
make strategic decisions around their
technical infrastructure and how to make
best make use of ICT investments across
the service. After completion this will define
a process that can be taken forward to
procure software systems required across
the service.  
Place Service Road Services;
Road *Services 
2021/22 - Adult Social Care Contract Monitoring - Substantial for oversight processes established by C&CG and some areas of monitoring, Limited for overall monitoring
framework, other monitoring aspects, and some areas of commissioning. 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA,ASCCON
TRACT.01
A Terms of Reference should be established for
the HSCP Quality Assurance sub-groups and it
should be established how frequently the groups
should meet and what they should report to the
31-Mar-
2025  75% Q2 25/26: Contract Management role now
in place and C&CG remains under review.  
Adult Health and
Social Care
Head of *Adult and
Social Care
Page 79 of 134

Page 80

Action Code Action Due Date Icon Progress Notes Service Managed By
C&CG.
IA,ASCCON
TRACT.02
An appropriate risk assessment framework should
be developed to determine the level of monitoring
that should be in place for all providers in line with
best practice issued by the Scottish Government.
31-Mar-
2025  10% Q2 25/26: Contract Management role now
in place and C&CG remains under review.  
Adult Health and
Social Care
Head of *Adult and
Social Care
IA,ASCCON
TRACT.04
Management should review how the Mosaic
system could be used to aid in provider
performance monitoring.
31-Mar-
2025  95% Q2 25/26: Contract Management role now
in place and C&CG remains under review.  
Adult Health and
Social Care
Head of *Adult and
Social Care 
2021/22 - Learning Disabilities and Physical Disabilities - Substantial Assurance for overall governance, Limited Assurance for commissioning arrangements and contract
monitoring arrangements 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.LDPD.01
.1 AS
Adult Services (AS) - Policies and Procedures
relating to Learning Disabilities and Physical
Disabilities should be reviewed and updated and
should be available on the intranet
30-Sep-
2025  65%
Q2 25/26: Awaiting update from Service
Manager on completion. Will be confirmed
for next reporting period.  
Adult Health and
Social Care Graham *Kilpatrick
IA.LDPD.01
.2 CS
Children Services (CS) - Policies and Procedures
relating to Learning Disabilities and Physical
Disabilities should be reviewed and updated and
should be available on the intranet
31-Mar-
2025  85%
Q4 24/25: New Service manager (Disability)
has commenced in post and is taking this
action forward as part of 2024/25 strategic
disability plan. 
Work around this action continues.  
Children’s Services,
Partnership and
Communities
Children’s Services 
2022/23 - Justice Services - Satisfactory 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.JUSTICE
.02
The framework agreements should be utilised to
develop a joined up, cross team procurement
exercise where terms and conditions with
Randstad are refreshed and documented across
HSCP teams to ensure value for money is being
achieved by all teams.
31-Aug-
2025  25%
Q2 25/26: In progress 
Randstad currently supply agency staff
across HSCP on different basis including
spot purchase. Work was undertaken with
HSCP to identify where these provisions are
available under Scottish Government or
Scotland Excel frameworks and to migrate
these across to the frameworks. In some
areas however, there is no framework
available and Randstad will only supply the
Adult Health and
Social Care;
Corporate Solutions
Place Performance
Officer; Legal *and
Governance
Manager
Page 80 of 134

Page 81

Action Code Action Due Date Icon Progress Notes Service Managed By
provision on their own terms. 
It should be noted that Randstad (and other
suppliers) are only commissioned when
they represent most economically
advantageous price. 
Recent investigation during quarter 1 has
shown that Randstad are not on a
framework. Contracts have been awarded
separately and would require all to be
terminated and re-tendered. It is therefore
recommended that this action be closed
because this cannot realistically be fully
completed without termination and re-
tendering. 
It has been proposed with Internal Audit that
this action is closed based on the above
information. Further discussions to be held
with internal audit to reach a decision.  
IA.JUSTICE
.05
Section 27 petty cash controls also require to be
strengthened to ensure alignment with Council
requirements.  For example, management should
ensure: ·The use of disbursement logs, ·The
frequency of reconciliation is in line with the
Council's risk
31-Mar-
2025  80% Q2 25/26: No further update available at
time of reporting.  
Adult Health and
Social Care
AHSC Performance
Officer; Head of
*Adult and Social
Care; Julie *Jessup;
Deklan Clelland;
Rhea Dornan 
2022/23 - Mental Health Services - Substantial for budget monitoring and partnership working. Limited for contract monitoring; and compliance with procurement regulations
and the Council’s FTPP policy 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.MH.05
Monitoring of performance should be undertaken
for all providers ensuring that all relevant
performance templates are completed. The
frequency of monitoring should be increased for
higher value contracts. Contracts where providers
are not meeting targets
31-Mar-
2025  93% Q2 25/26: Ongoing as part of the CC&G
work.   
ED/CSPC
Performance
Officer
Page 81 of 134

Page 82

Action Code Action Due Date Icon Progress Notes Service Managed By
IA.MH.05
HSC
IA.MH.05 Health and Social Care (HSC) -
Monitoring of performance should be undertaken
for all providers ensuring that all relevant
performance templates are completed. The
frequency of monitoring should be increased for
higher value contracts. Contracts
31-Mar-
2025  80% Q1 25/26: Ongoing   Adult Health and
Social Care
Head of *Adult and
Social Care 
2022/23 - Utilities: Energy and Water Consumption - Substantial Assurance for the procurement arrangements, invoicing and third-party usage.  Limited Assurance for usage
monitoring and the medium to long-term plans to reduce usage. 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.UTILITIE
S.06
The property sharing arrangement with the NHS
for the Recovery Hub including any rental
contribution should be reviewed to ensure it
reflects current usage and this should be
documented in a written agreement between the
Council and NHS Lothian.
31-Mar-
2025  90% Q2 25/26: Confirmation requested that this
is complete, update for next quarter.  
Adult Health and
Social Care
Head of *Adult and
Social Care 
2023/24 - Attainment Scotland Funding - Reasonable Assurance 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.ASF.02
Appropriate officers within the Education
Directorate should annually receive a copy of the
School Fund Audit Report for each school with a
school fund and these should be reviewed to
check for compliance with the School Fund
Guidelines.
31-Mar-
2025  30%
Q4 24/25: Work ongoing 
Work in this area is ongoing within the
Finance team - Request has been made to
extend this audit action to Q2 25/26  
Education
Young People and
Partnerships,
Executive Director
*Children
IA.ASF.03
The School Fund Guidelines should be updated,
include the procedures for monitoring hardship
funds, the allowable reasons for transferring PEF
budgets to school funds, and processes should be
developed to ensure that funds are used as
intended.
31-Mar-
2025  30%
Q4 24/25: Work ongoing 
Work in this area is ongoing within the
Finance team - Request has been made to
extend this audit action to Q2 25/26  
Education
Young People and
Partnerships,
Executive Director
*Children
IA.ASF.04
An NCA and SLA should be in place for
therapeutic suppliers used by schools and
quotations   tendering considered.  PEF spend in
2024/25 should be reviewed to ensure compliance
with procedures and a reminder issued of the
31-Mar-
2025  30%
Q4 24/25: Work ongoing 
Work in this area is ongoing within the
Procurement team - Request has been
made to extend this audit action to Q2
25/26  
Education Sinead Urquhart 
Page 82 of 134

Page 83

Action Code Action Due Date Icon Progress Notes Service Managed By
approved framework suppliers.
IA.ASF.05
Management should liaise with Procurement to
ensure that a non-competitive action form is in
place for all contracts that have not been
competitively tendered, quotations / tendering is
considered, and a service level agreement is
prepared as required.
31-Mar-
2025  18%
Q4 24/25: Work ongoing 
Work in this area is ongoing within the
Business team - Request has been made to
extend this audit action to Q2 25/26  
Education Hazel *Moar; Claire
*Sutherland 
2023/24 - Bowles Report - School Capacity 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.BOWLES
.04
The concept of including a figure for expected
numbers of children who are privately educated
within the roll projections methodology should be
explored as part of regular reviews of the pupil role
projection.
30-Jun-
2025  30%
Q4 24/25: Work ongoing 
We continue to explore this however we can
only give number that go into secondary or
leave primary part way through, so this is
not achievable at this time.  
Education Magnus Inglis
IA.BOWLES
.07
The 2017-2047 Midlothian Learning Estate
strategy approved in 2017 should be updated to
include the correct pupil product ratios and the
updated version should be published on the
Council's website.
30-Jun-
2025  30%
Q2 25/26: Work ongoing 
Joint audit with Education and Place. The
updated pupil product ratios will be reflected
in the next updated Learning Estate
Strategy. Note that this ratio is reviewed to
ensure suitability.  
Education; Place
Service
Executive Director
*Place; Fiona
*Robertson
IA.BOWLES
.08
Consideration should be given to including a
clause in S75 developer agreements to protect the
Council against the risk of any unusual or
unexpected increases in construction costs.
31-Dec-
2024  0%  Executive Director
*Place
Executive Director
*Place
IA.BOWLES
.09
Following the external review of pupil forecasting,
risks and ratings relating to school capacity /
building should be reviewed and updated where
applicable.
30-Jun-
2025  40%
Q2 25/26: Work ongoing 
Recent audit added. Joint audit between
Place and Education. Roll data is reviewed
to ensure appropriate statutory capacity is
provided.  
Education; Place
Service
Executive Director
*Place; Fiona
*Robertson 
2023/24 - Care Homes Council & Private- Substantial and Limited 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.CAREHO
MES.01
Overarching guidance should be in place for
managing Newbyres and Highbank Care Homes.
31-Mar-
2025  40% Q2 25/26: Updates requested from Service
Managers on completion.  
Adult Health and
Social Care
Head of *Adult and
Social Care
Page 83 of 134

Page 84

Action Code Action Due Date Icon Progress Notes Service Managed By
The guidance should explain the roles and
responsibilities of services, legislative
requirements and monitoring arrangements.
IA.CAREHO
MES.03
Care plan reviews for residential care should be
undertaken on a timely basis and the community
care home review policy should be reviewed and
updated.
31-Mar-
2025  50% Q2 25/26: Updates requested from Service
Managers on completion.  
Adult Health and
Social Care
Head of *Adult and
Social Care
IA.CAREHO
MES.04
Care Home Service risks should be recorded
within an Adult Social Care Risk Register in line
with the Council’s Risk Management Policy.
31-Mar-
2025  30% Q2 25/26: Updates requested from Service
Managers on completion.  
Adult Health and
Social Care
Head of *Adult and
Social Care
IA.CAREHO
MES.05
Monitoring of care homes should be undertaken to
ensure they are complying with the NCHC.
Building & contents insurance should be checked
annually and maintained. All external care home
providers should have adequate business
continuity plans.
31-Mar-
2025  15% Q2 25/26: No further update available at
time of reporting.  
Adult Health and
Social Care
Head of *Adult and
Social Care 
2023/24 - Education Software - Mix of Substantial and Limited Assurance 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.EDUSW
ARE.01
Guidance distributed should include Windows and
web-based applications used by schools if they are
still being used including support and monitoring
arrangements. Guidance should be provided for
schools requiring new Windows software installed.
30-Jun-
2025  75%
Q1 25/26: In progress 
There is no guidance provided to schools
on Windows applications because the
Windows 11 upgrade is now complete and
school devices are unable to access
Windows 11 applications not approved prior
by Digital Learning, therefore the first part of
guidance is no longer required (action
complete). The remaining part of this action
on web –based applications (used on
school devices) requires action from Digital
Learning team and not Digital Services. In
relation to guidance being provided for
schools requiring new Windows software,
the guidance is that any requests for
Windows applications needs to be approved
by Digital Learning first as these cannot be
accessed now due to the Windows11
upgrade.  
Education Susan *Ward
Page 84 of 134

Page 85

Action Code Action Due Date Icon Progress Notes Service Managed By
IA.EDUSW
ARE.08
Review education software on Windows devices
and web-based apps to establish if it is still used,
meets the relevant educational needs, identify
overlap/duplication between school purchases and 
DI&L, and to either remove or update the software
as needed.
30-Jun-
2025  75%
Q4 24/25: In progress 
Connected to the software in schools
action. On track to complete by end of June
2025.  
Education Susan *Ward 
2023/24 - Risk Management - Substantial for Risk Management Policy and application at a strategic level. Limited over the application of the Risk Management Policy at the
service level, training, guidance, and service level reporting and monitoring. 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.RISK.02
Annual reporting should be in place to provide the
Audit Committee with assurance on compliance
with the Risk Management Policy.  Risk
management procedures should be in place and
available on the intranet and the officer risk group
should be reinstated.
30-Sep-
2025  25%
Q2 25/26: In progress 
Draft Risk Management Policy completed
and presented to Chief Officer Place and
Strategic Risk & Resilience Group in May
2025 for comments. To be approved by
committee.  
Place Service Senior Manager
Protective Services
IA.RISK.04.
CHILDREN'
SSERVICE
S
Chief Officers and Head of Service should ensure
that their service risk registers are appropriately
updated by relevant managers.  Service risks
should be reported to DMTs and escalated as
required to CMT and the Strategic Risk Register.
30-Sep-
2025  60%
Q4 24/25: In progress 
Service risk registers are reviewed and
updated as part of quarterly performance
reporting. Further work is required to review
historic risks.  
Childrens Services,
Partnership and
Communities
Children’s Services
Management Team
IA.RISK.04.
EDUCATIO
N
Chief Officers and Head of Service should ensure
that their service risk registers are appropriately
updated by relevant managers.  Service risks
should be reported to DMTs and escalated as
required to CMT and the Strategic Risk Register.
30-Sep-
2025  60%
Q4 24/25: In progress 
Service risk registers are reviewed and
updated as part of quarterly performance
reporting. Further work is required to review
historic risks.  
Education Chief Operating
Officer *Education
IA.RISK.04.
HEALTHAN
DSOCIALC
ARE
Chief Officers and Head of Service should ensure
that their service risk registers are appropriately
updated by relevant managers.  Service risks
should be reported to DMTs and escalated as
required to CMT and the Strategic Risk Register.
30-Sep-
2025  75%
Q2 25/26: Midlothian HSCP services
maintain local risk registers in line with
partner policies.  
Adult Health and
Social Care
Director *Health
and Social Care;
Roxanne *King 
2024/25 - Education Construction Governance - Reasonable Assurance 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.EDUCO For financially significant, strategic projects, 30-Sep- 0% Q1 25/26  Education Marc *Bedwell
Page 85 of 134

Page 86

Action Code Action Due Date Icon Progress Notes Service Managed By
GOV.01 management should obtain assurance that
appropriate project management resource is in
place by ensuring a procurement exercise such as
a mini-competition is completed for future projects.
2025 Following approval of Development Team
and Learning Estate Rationale Report by
CMT in June 2025, the personnel delivering
the Learning Estate development were
moved to report to Marc Bedwell and Fiona
Robertson in the Children, Young People &
Partnerships Directorate. 
Awaiting confirmation from Internal Audit to
remove audits from Place.  
IA.EDUCO
GOV.02
Specific Midlothian performance standards,
expectations, and governance arrangements
should be documented at the call-off stage so that
an appropriate baseline is set for the External
Project Manager’s performance for the duration of
the project.
30-Sep-
2025  0%
Q1 25/26 
Following approval of Development Team
and Learning Estate Rationale Report by
CMT in June 2025, the personnel delivering
the Learning Estate development were
moved to report to Marc Bedwell and Fiona
Robertson in the Children, Young People &
Partnerships Directorate. 
Awaiting confirmation from internal audit to
remove audits from Place.  
Education Marc *Bedwell
IA.EDUCO
GOV.03
Review the use of agency resource and establish if
any roles should be reconsidered for Council
contract appointment. The approved agency
frameworks should be utilised for new
appointments and incumbent resource transitioned
in a planned process.
30-Sep-
2025  50%
Q2 25/26: In progress 
Approval of Service Review for
Development Team has allowed for
recruitment to be initiated for roles currently
filled with agency staff. Interviews complete
and offers made for 4 of the 6 roles
recruiting into.  
Education Marc *Bedwell
IA.EDUCO
GOV.04.1
The BCHS Project Board ToR should be updated
to detail the roles and responsibilities of Project
Board members and to establish a quorum for
board decisions.
30-Sep-
2025  0%
Q1 25/26 
Following approval of Development Team
and Learning Estate Rationale Report by
CMT in June 2025, the personnel delivering
the Learning Estate development were
moved to report to Marc Bedwell and Fiona
Robertson in the Children, Young People &
Partnerships Directorate. 
Awaiting confirmation from internal audit to
remove audits from Place.  
Education Marc *Bedwell
Page 86 of 134

Page 87

Action Code Action Due Date Icon Progress Notes Service Managed By
IA.EDUCO
GOV.04.2
The MLCC Project Board ToR should be updated
to establish a quorum for board decisions, the
incomplete sections on Tolerances and
Stakeholders updated, and a realistic board
meeting frequency should be established and
practiced by board members.
30-Sep-
2025  0%
Q1 25/26 
Following approval of Development Team
and Learning Estate Rationale Report by
CMT in June 2025, the personnel delivering
the Learning Estate development were
moved to report to Marc Bedwell and Fiona
Robertson in the Children, Young People &
Partnerships Directorate. 
Awaiting confirmation from internal audit to
remove audits from Place.  
Education Marc *Bedwell
IA.EDUCO
GOV.05
Internal PMs should liaise with External PMs to
ensure risk registers are regularly reviewed and
updated. Project risks should be summarised to
the board with reference to the full project risk
register so there is assurance that they are up-to-
date.
30-Sep-
2025  0%
Q1 25/26 
Following approval of Development Team
and Learning Estate Rationale Report by
CMT in June 2025, the personnel delivering
the Learning Estate development were
moved to report to Marc Bedwell and Fiona
Robertson in the Children, Young People &
Partnerships Directorate. 
Awaiting confirmation from internal audit to
remove audits from Place.  
Education Marc *Bedwell
IA.EDUCO
GOV.07
The ToR for the CP&AMB and CYPE Programme
Board should be updated to document when
issues should be escalated to the Chief Executive
and Leader of the Council. The CP&AMB ToR
should adequately outline its reporting relationship
with the CMT.
30-Sep-
2025  50%
Q2 25/26: In progress 
Head of Development / CPAMB ToR
updated and will be submitted to November
CPAMB for approval.  
Education; Place
Service
Marc *Bedwell;
Head of
*Development 
2024/25 - IT Asset Management - Limited Assurance 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.ITASSET
S.08 -
Education
The reason for disposal should be documented
and authorisation evidenced before the assets are
collected by the contractor. Documentation should
be complete, systems updated, and any
differences between assets for disposal and those
collected explained.
30-Sep-
2025  0%  Education Susan *Ward 
Page 87 of 134

Page 88

Recruitment & Use of Agencies - Limited Assurance 
Action Code Action Due Date Icon Progress Notes Service Managed By
IA.RECRUI
T&AGENCI
ES.4.1
All DMTs should refer to the workflow authorisation
ID in the staffing spreadsheets taken to DMT for
approval so there is a clear audit trail between the
workflow authorisation and what was approved at
DMT.
31-Oct-
2025  0%
Q2 25/26: New audit action added Oct 2025
– progress will be monitored in quarter 3
reporting period.  
Corporate Solutions Chief Officer
Corporate Solutions
IA.RECRUI
T&AGENCI
ES.07
The retention requirement for shortlisting
information should be included in the information
pack sent to recruiting managers.
31-Oct-
2025  0%
Q2 25/26: New audit action added Oct 2025
– progress will be monitored in quarter 3
reporting period.  
Corporate Solutions Jacqui Dougall 
Page 88 of 134

Page 89

Appendix 2
Internal Audit Performance Report – Actions in Progress 
Status: In Progress 113 
Financial
Years
Areas Total
Place Corporate
Solutions
Children,
Young People
& Partnerships 
Health and
Social Care
2018/19 1 2 0 0 3
2019/20 0 3 0 0 3
2020/21 5 0 0 0 5
2021/22 9 2 0 0 11
2022/23 7 3 0 0 10
2023/24 15 13 1 0 29
2024/25 5 14 11 0 30
2025/26 0 20 1 1 22
Total 42 57 13 1 113 
Page 89 of 134

Page 90

Page 90 of 134

Page 91

Appendix 2
Internal Audit Performance Report – Actions in Progress 
Status: In Progress 113 
Financial
Years
Areas  Total
Place Corporate
Solutions
Children,
Young People
& Partnerships 
Health and
Social Care
Actions Jointly
Owned by
Children,
Young People
& Partnerships
and Health and
Social Care
Actions Jointly
Owned by
Corporate
Solutions and
Place
Actions Jointly
Owned by
Corporate
Solutions,
Children,
Young People
& Partnerships,
and Health and
Social Care
2018/19 1 2 0 0 0 0 0 3
2019/20 0 3 0 0 0 0 0 3
2020/21 5 0 0 0 0 0 0 5
2021/22 9 2 0 0 0 0 0 11
2022/23 7 3 0 0 0 0 0 10
2023/24 14 13 1 0 0 1 0 29
2024/25 5 14 10 0 1 0 0 30
2025/26 0 17 1 1 0 1 2 22
Total 41 54 12 1 1 2 2 113 
Page 91 of 134

Page 92

Page 92 of 134

Page 93

Audit Committee
Tuesday 2 December 2025
Item 5.4 
Strategic Risk Management – Strategic Risk Profile Quarter 2, 2025-26 
Report by Derek Oliver, Chief Officer Place 
Report for Information 
1 Recommendations 
Audit Committee is recommended to: 
• Note the current risk landscape and organisational response to
the most significant risks in Quarter 2, 2025-26 (1st July to 30th
September 2025). 
2 Purpose of Report/Executive Summary 
The purpose of this report is to provide Audit Committee with: 
• An update on the risk responses Midlothian Council has
implemented during Q2 2025/26 to respond to the current risk
climate
• Assurance that Midlothian Council took a proportionate and
planned approach to prepare and respond to the current risk
climate
• The risk evaluation of current strategic risks and opportunities
for the Council 
20th November 2025 
Report Contact:
Derek Oliver, Chief Officer Place
Derek.Oliver@midlothian.gov.uk 
Page 93 of 134

Page 94

3 Q2 Risk Management Overview 
3.1 Midlothian Council has delivered a wide range of services to the people
of Midlothian throughout Quarter 2, 2025-26. 
3.2 The Council continues to manage and review risks recorded within the
Strategic Risk Profile. The work required to maintain the necessary
corporate oversight over the broader strategic landscape continues
through the Risk and Resilience Chief Officer Group and Corporate
Management Team (CMT). 
3.3 Audit Committee should note that there were no new risks added from
the previous Quarter however, as per the request from Audit
Committee, the Strategic Opportunities section was revised to include
Strategic Projects.  The Projects included have a Red category across
their respective Risk Evaluation. Updates on actions taken are included
in the full strategic risk profile (Appendix B). 
3.4 Strategic Risk Profile (SRP) 
The SRP is split into three sections:
• Strategic Issues
• Strategic Risks
• Opportunities 
3.5 STRATEGIC ISSUES - SUMMARY 
Strategic issues Likelihood Impact Score Evaluation 
Q2 2025/26 Q1 2025/26
The Change Programme 5 5 25 Critical Critical
Financial Sustainability 5 5 25 Critical Critical 
3.6 The Change Programme 
The Change Programme remains evaluated at Critical. The financial
challenges of the forecasted budget gap pose a significant challenge
for benefits realisation. Council agreed to a Transformation Blueprint in
June 2023 which is a 5-year transformation plan. 
3.7 Financial Sustainability 
The scale of the financial challenge continues to be reported to the
Business Transformation Steering Group and Council. 
Page 94 of 134

Page 95

3.8 STRATEGIC RISKS – SUMMARY 
Strategic Risks Likelihoo
d
Impac
t Score Evaluation
Q2 25-26  Q1 25-26
Financial Sustainability in
Future Years 5 5 25 Critical  Critical
The Long-Term Change
Programme 5 5 25 Critical  Critical
Legal and Regulatory
compliance 5 5 25 Critical  Critical
Climate Change 5 5 25 Critical  Critical
Emergency Planning and
Business Continuity 4 5 20 High  High
Cyber Security 4 5 20 High  Medium
Growing Council 4 4 16 High  High
Scottish Child Abuse
Inquiry 4 4 16 High  High
Health and Safety/Fire 4 4 16 High  High
Asset Management 3 5 15 Medium  Medium
Cost of Living Crisis 3 5 15 Medium  Medium
Counter Terrorism 3 4 12 Medium  Medium
Employee Performance 3 4 12 Medium  Medium
Care at Home 3 4 12 Medium  Medium
Governance and Standards 2 4 8 Low  Low
Internal Control
Environment 2 3 6 Low  Low
Corporate Policies and
Strategies 2 3 6 Low  Low 
3.9     STRATEGIC RISKS – RATED CRITICAL/HIGH 
3.10 Financial Sustainability in future years
The scale of the financial challenge continues to be reported to
Business Transformation Steering Group and Council. 
3.11 The Long-Term Change Programme
The Change Programme has remained at Critical for the last 2 years.
The financial challenges of the underlying budget gap pose a
significant challenge. Council agreed to a Transformation Blueprint in
June 2023 which is a 5-year transformation plan. 
Page 95 of 134

Page 96

3.12 Legal and Regulatory compliance
Significant resourcing pressures have impacted on risk evaluation. 
Work is ongoing with the Scottish Information Commissioner and
National Records of Scotland to develop and deliver improvement
plans. 
3.13 Climate Change 
Councillors were presented with a briefing on the Climate Action Plan
in Q2 24-25 as committed to through the Transformation Blueprint. 
With a report presented to October Council, Councillors approved,
given the challenges (particularly financial), the realignment of the
target deadline of 2030 for net zero emissions from the Midlothian
Council estate to 2045.  In light of this, a refresh of the Council’s
Climate Change Strategy, approved by Council in August 2020, is
progressing. 
3.14 Emergency Planning and Business Continuity
Ongoing monitoring of a changing landscape and maintaining
organisational readiness and preparedness. Increase in evaluation
score aligned to internal audit of Risk Management, specifically in
relation to a focus on resource, service risk registers and business
continuity planning, as previously reported to Committee. This work is
progressing. 
3.15 Growing Council
The risk evaluation remains High in Q2 2025-26. This is in response to
the current financial challenge as described above and the increased
pressure the Council faces with growth. Some current examples of this
include:
• Inflationary impact on the delivery of the capital programme
• Cost of living crisis 
• Pressure on the care sector as people are living longer and
require more care provision
• General population growth places additional demand on
infrastructure such as GPs, schools, waste services etc. 
3.16 Scottish Child Abuse Inquiry (SCAI)
The SCAI risk evaluation remains High as the Inquiry continues. 
3.17 Health and Safety/Fire Safety
Fire safety audits continue across the estate. New Head of
Establishment Fire Information Handbook and Fire Logbooks rolled out
with emphasis on need to complete/update Fire Evacuation Plans.
Estate Safety & Maintenance Groups refreshed to identify and action
any priority safety or repairs matters. 
Page 96 of 134

Page 97

3.18  Cyber Security
The current climate and intelligence has raised the likelihood score and 
thus overall evaluation from Medium to High.  Our teams remain
vigilant and have in place necessary cyber resilience action plans and
certification. 
3.19 STRATEGIC OPPORTUNITIES 
3.20 Capital Projects - Housing
Projects impacted with 26% reduction in Affordable Housing Supply
Programme grant to Midlothian and continued high build costs.  Phase
5 housing programme has been reviewed to ensure affordability within
the Housing Revenue Account, allowing for reduced levels of grant. 
Projects highlighted with specific Red Risk Evaluation(s) and detailed
within the SRP are Newbyres, Gorebridge; Edmonstone Road,
Shawfair and Newton Church Road, Danderhall. 
3.21 Capital Projects – Transport, Net Zero & Infrastructure
Cost of delivering enabling infrastructure projects has risen, resulting in
significant funding gap emerging and impacting on progress of A701
Relief Road, Sustainable Transport Corridor and Straiton Junction
Improvements, which are detailed within the SRP. 
3.22 Capital Projects – Children, Young People & Partnerships Estates
Programme: Primary
Five specific projects identified within the SRP:
1. Mayfield/St Lukes PS New Build: Tender return from Stage 1
exceeds available budget. Programme delayed for project revision. 
2. Kings Park PS Extension & Refurbishment: No available budget to
undertake extension. Condition and suitability of school to be
addressed.
3. Rosewell PS Extension: No available budget to undertake
extension. Condition and suitability of school to be addressed.
4. Mauricewood PS Extension & Refurbishment: Rising roll and
catchment review requires investment in school to address capacity
and suitability. Limited budget available.  Design team appointed to
develop investment in school that aligns with budget available from
Developer Contributions.
5. Bilston PS Extension: Rising roll and catchment review requires
investment in school to address capacity and suitability. Limited
budget available.  Design team appointed to develop investment in
school that aligns with budget available from Developer
Contributions. 
Page 97 of 134

Page 98

3.23 Capital Projects – Children, Young People & Partnerships Estates
Programme: Secondary
Three specific projects identified within the SRP:
1. Beeslack HS Replacement:  Contractor appointment delayed.
Programme behind due to changes in scope / design.  
2. Shawfair All Through: Site acquisition complete. School location
fixed with design team. Remediation programme being revised.
Seeking to make efficiencies in remediation programme.
3. Penicuik HS New Build: LEIP target for delivery is Dec 2026,
however programme for occupation is July 2027. Cost reports
tracking higher and risks identified in refurbishment works.   SFT
advising if additional LEIP funding available. 
3.24 Capital Projects – Regeneration
Three specific projects identified within the SRP:
1. Vogrie Changing Places: now progressing .
2. Destination Hillend: Alpine Coaster delivered with access and
parking infrastructure. Project absorbed risk and contingency. 
Delays to delivery resulting from issues with access / water mains.
Main Building tender return exceeded budget. Next Phase to be
recast. Interim works on water supply and drainage required.
3. Hopefield Industrial Estate: Updated financial model required. 
3.25 City Region Deal
Edinburgh and South East Scotland City Region Deal - bid for funding
to Scottish and UK Governments to accelerate economic growth
through investment in infrastructure/ housing/ skills and innovation was
agreed by Council in June 2018.  Projects continue to be progressed
with realisation of regional enhancements and connectivity. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
There are no direct resource implications indicated in this report,
although individual risks have associated resource implications. 
4.2 Digital 
None 
4.3 Risk 
The risks reported in this report are understood with the Council able to
demonstrate the current risk controls and actions being taken in
response to these.
The report provides an overview of the significant risks faced by the
Council during Quarter 2, 2025-26 and should act to provide assurance
that Midlothian Council took a proportionate and planned approach to
prepare and respond to each of these risks. 
Page 98 of 134

Page 99

4.4 Ensuring Equalities (if required a separate IIA must be completed) 
There are no direct equalities issues arising from this report. 
4.5 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Strategic Risk Profile (Quarter 2, 2025-26)
Page 99 of 134

Page 100

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
This report provides an overview of the Strategic Risk Profile of
Midlothian Council at a defined point in time. The issues, risks and
opportunities affecting or supporting delivery of the council priorities are
set out within the Strategic Risk Profile. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The Council’s commitment to best value and securing continuous
improvement can best be delivered when decisions are made against a
backdrop of understanding the risks and opportunities before an
organisation. This report seeks to provide assurance that the current
risk environment is understood and that Midlothian Council is taking
appropriate action in response to those identified risks. 
A.5 Involving Communities and Other Stakeholders 
This Strategic Risk Profile report has been compiled with input from a
range of internal key stakeholders. 
A.6 Impact on Performance and Outcomes 
This report seeks to provide an overview of the challenging risk
environment within which the Council is operating at this time. Being in
a risk aware position helps to inform current and future decision
making, with the intention of enhancing decision making and the
Page 100 of 134

Page 101

associated performance and outcomes which flow from well informed
decision making. 
A.7 Adopting a Preventative Approach 
The Risk Management approach being taken by the Council is founded
on a preventative approach to managing risks, where appropriate and
more generally to decision making with far greater risk awareness. 
A.8 Supporting Sustainable Development 
Senior Managers must ensure the sustainability of the Council, which
entails identifying, understanding and managing Strategic and Service
level risks and opportunities.
Page 101 of 134

Page 102

Page 102 of 134

Page 103

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
STRATEGIC RISK PROFILE, Q2 July-Sept 2025 
STRATEGIC RISK PROFILE 
SRP This risk register captures the main strategic issues, risks and opportunities that are corporate in nature. It identifies the nature of the risks, measures required to control the risks and their evaluation. It also
details what further actions are required to reduce the likelihood and impacts of those risks to more acceptable and manageable levels with timescales.  
Strategic Issues 
SRP.IR.02 The Change Programme 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.IR.
02
Risk cause
The pace of transformation strands of
activity, reporting to the Business
Transformation Board, does not secure
service transformation, delivery of
outcomes or benefit realisation. 
Risk event
Delayed progress or non-achievement of
outcomes and benefits. 
Risk effect 
Slow or delayed financial benefits arising
from service redesign, requiring the
adoption of recovery plans or requiring
short term service reductions which impact
on the Council’s ability to deliver against
its priorities.
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
1. Transformation Blueprint agreed at Council June 2023 which is a 5-
year transformation plan. Revised governance for transformation agreed
and revised Terms of Reference in place for the Business Transformation
Board to oversee progress on change programme. 
2. Regular reporting to Council setting out scale of financial challenge
ahead with recurring expenditure for current service delivery projected to
exceed recurring income. 
3. Cross Party Business Transformation Steering Group are given
updates on the progress of the Transformation programme. 
4. Financial monitoring reports and work of the Corporate Management
Team evidence continued financial sustainability, in so far as services
are delivered within the overall budget in year.  
5 5 
Page 103 of 134

Page 104

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SPR.R
A-02.08 Transformation Blueprint 2023-28 delivery
Q2 25/26: As per previous Quarters.  Progress with sprints is reported to BTB
at every meeting via the dashboard and also in detailed reports at some points.
BTSG are provided with an updated dashboard every cycle and receive focused
reports on individual sprints and also funding requests to release BT funds to
support project work. 
Chief *Executive;
Chief Officer
*Place; Chief
Officer Corporate
Solutions; Chief
Finance Officer; 
30-Jun-2028  20%
SRP.R
A.02.03i
Develop Medium Term Financial Strategy
with greater oversight, clearer
responsibility and accountability.
Q2 25/26: As Q1 25/26. 
Q1 25/26: Updated MTFS projections to 2028/29 were presented to Council in
June 2025. A further update will be provided in quarter 3 of 25/26. 
Q4 24/25: MTFS projections to 2028/29 were presented to Council in February
2025 as part of setting the 2025/26 budget and accompanying Council Tax
levels. A further update will be provided to Council during Q1 of 25/26. 
Q3 24/25: An update on the MTFS was presented to Council in December along
with outcomes from the public consultation. Detailed analysis of emerging
national budget positions for 2025/26 was presented and discussed at the
Business Transformation Group. 
Q2 24/25: Further update on the MTFS was presented to Council in October
and a public consultation was launched on 9th October running to 20th
November. 
Q1 24/25: An update on the MTFS was presented to Council in June 2024. This
identifies immediate actions required, in addition to those in the Transformation
Blueprint, to bridge the gap between recurring expenditure and recurring
income and to allow the setting of a balanced budget for 2025/26. 
Chief *Executive;
Chief Finance
Officer;
30-June-2024  100%              
Page 104 of 134

Page 105

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
SRP.IR.07 Financial Sustainability 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.IR.
07
Risk cause
Scottish Government Grant settlements
fall short of the resources needed to
sustain core services. Core funding falling
short of inflation pressures, pay awards
and demographic pressures arising from
an Increasing ageing population of over
75’s. 
Increasing population of 0-15 age group.
Rising customer expectations. 
Risk event
Transformation activity and the flexibility
available to Councils as part of the grant
settlement does not address future years
projected budget gaps. 
Risk effect Inadequate government
funding makes securing balanced budgets
challenging. This in turn erodes the
Council’s ability to deliver services to the
community and potentially means that
resources available fall short of those the
Council assess as required to meet its
statutory obligations. Whilst transformation
activity can help reshape services and
ensure best value in the delivery of
services it is not a solution to continued
erosion of core funding. 
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
1. There is an approved Capital Strategy and Reserves Strategy in place.
The Capital Strategy is being updated in the context of ongoing and
significant infrastructure pressures and to reflect completed Asset
Management Plans.. 
2. There is an approved budget for 2025/26. Services are delivered
within the totality of that budget. 
3. Enhanced monitoring arrangements have been agreed for service
areas that are regularly showing overspends. 
4. Directorates have budget boards in place to monitor and agree actions
for those items which are identified as needing specific attention or
present a risk to the financial position of services. 
5. Strategic Boards in place and BTB focus and attention on driving
transformation to support future year’s financial sustainability. 
6. Working through COSLA to influence government spending decisions
to influence Scottish Government’s budget allocation to Councils. 
7. Capital Plan and Asset Management Board will scrutinise and
challenge slippage on capital programmes recognising that slippage can
have an adverse impact on financial sustainability and also the delivery
on assets required to support capital growth. 
8. Chief Executive continues to emphasise the need for effective financial
control and underlined the benefit to the organisation of such an
approach.  
9. Scottish Governments May 2022 Resource Spending Review provided
planning parameters for term of parliament, albeit these are challenging
and present a real terms reduction in grant funding of circa 7% over the
period. 
10. Report to Council February 2025 sets out scale of financial challenge
ahead with recurring expenditure for current service delivery projected to
exceed recurring income. Updated MTFS projections presented in June
2025 with a further update to be presented in February 2026.
11. Cross Party Business Transformation Steering Group engaged in
consideration of measures to secure balanced budgets alongside the
development of a Strategic Plan to support decisions about what
services, beyond those which are statutory can be provided.  
12. Income Generation
5 5 
Page 105 of 134

Page 106

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SPR.R
A-02.09 Transformation Blueprint 2023 to 2028 Q2 25/26: Refer to SRP.RA-02.08
Chief *Executive;
Chief Finance
Officer; 
30-Jun-2024  20%
SRP.R
A.02.03
Develop Medium Term Financial Strategy
with greater oversight, clearer
responsibility and accountability.
Q2 25/26: Refer to SRA.RA-02.03i
Chief *Executive;
Chief Finance
Officer; 
30-June-2024  100%
SRP.R
A-02.10 Capital Plan Prioritisation
Q2 25/26: Building Asset Management Plan approved by Council. Fleet Asset
Management Plan and Digital Asset Management Plans are under development
and are key parts of finalising the Capital Plan Prioritisation exercise. 
Q1 25/26: Work evaluating information flowing from building condition surveys
continues with a view to presenting a draft building Asset Management Plan to
Council in October. 
Q4 24/25: Council in February received an update on Capital Plan Prioritisation
work and made a decision on an updated Learning Estate Strategy. The extent
and affordability of work flowing from building condition surveys is being
assessed and will be concluded and reported to Elected Members early in
2025/26.
Q3 24/25: Work continues on Capital Plan Prioritisation
Q2 24/25: Work continues on Capital Plan prioritisation
Q1 24/25: Work continues on Capital Plan prioritisation 
Chief Finance
Officer; Executive
Director – Place;
Executive Director
- Education
31-Oct-2024  0% 
Page 106 of 134

Page 107

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Strategic Risks 
SRP.RR.01 Financial Sustainability in Future Years
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.01
Risk cause:
Scottish Government Grant settlements
fall short of the resources needed to
sustain core services. Core funding falling
short of inflation pressures, pay awards
and demographic pressures arising from
an Increasing ageing population of over
75’s. 
Increasing population of 0-15 age group.   
Rising customer expectations. 
Policy decisions by UK & Scottish
Governments which are not fully funded. 
Changes to the responsibilities of Local
Government and the funding implication
that arise from that. 
Future year pay award settlements. 
Risk event: 
Real terms reduction in core grant
settlements. 
Policies decisions at Government level not
fully funded to Council's. 
Securing the extent of change required in
order to deliver financial sustainability and
a change program that recognises the size
of the challenge. 
Cost pressures exceeding budget
estimates.
Pressures on increasing insurance
premiums and associated risk
improvement actions.
Risk to not achieving financial
sustainability is a failure to deliver cost
reductions / service change embedded in
the blueprint and also supplementing the
blueprint.
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
1. Development of Strategic Plan, Transformation Blueprint and MTFS
projections which come together to provide a framework to effect change
and to move the Council to a position of financial sustainability. 
2. Maintaining a level of reserves to deal with unforeseen or one-off cost
pressures. 
3. Capital and Reserves Strategies in place. The Capital Strategy is
being updated in the context of ongoing and significant infrastructure
pressures. 
4. Working through COSLA to influence government spending decisions
to influence Scottish Government’s budget allocation to Councils. 
5. Implement a lobbying strategy with government to recognise the
unique position Midlothian Council is in. 
6. Best Value Audit report actions. 
7. Strategic Boards in place to drive transformation in line with the
Transformation Blueprint. 
8. Risk & Resilience Group and CMT oversight of Insurance Risk
Improvement Actions. 
5 5 
Page 107 of 134

Page 108

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.02.03
Develop Medium Term Financial Strategy
with greater oversight, clearer
responsibility and accountability.
Q2 25/26: Refer to SRP.RA-02.03i
Chief *Executive;
Chief Finance
Officer; 
30-June-2024  100%
SRP.RA
.02.04 Transformation Blueprint 2023 to 2028 Q2 25/26: Refer to SRP.RA-02.08
Chief *Executive;
Chief Finance
Officer; 
30-Jun-2028  20%
SRP.RA
.02.06 Capital Plan prioritisation
Q2 25/26: Building Asset Management Plan approved by Council. Fleet Asset
Management Plan and Digital Asset Management Plans are under development
and are key parts of finalising the Capital Plan Prioritisation exercise. 
Q1 25/26: Work evaluating information flowing from building condition surveys
continues with a view to presenting a draft building Asset Management Plan to
Council in October. 
Q4 24/25: Council in February received an update on Capital Plan Prioritisation
work and made a decision on an updated Learning Estate Strategy. The extent
and affordability of work flowing from building condition surveys is being
assessed and will be concluded and reported to Elected Members early in
2025/26. 
Head of
*Development;
Executive Director
*Place; Chief
Finance Officer; 
31-Oct-2024  0%  
SRP.RR.02 The Long-Term Change Programme 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.02
Risk cause:
A MTFS that does not address the
projected budget shortfall or contextual
factors relating to the Midlothian area. 
Reduced resources 
Leadership fit for the future. 
Lack of clarity or clear compelling vision
for the future 
Delay or shortfall in securing savings 
Lack of or not securing transformational
change in service provision 
Risk event:
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
1. Development of Strategic Plan, Transformation Blueprint and MTFS
projections which come together to provide a framework to effect change
and to move the Council to a position of financial sustainability. 
2. Leadership from all Elected Members, Executive Team and Senior
Leadership Group. 
3. Appropriate governance in place across the BTB Strategic Boards 
4. Resilience planning. 
5. Capacity to deliver change. 
6. High level priority is given to blueprint work.    
5 5 
Page 108 of 134

Page 109

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Delayed progress in applying various
strands of the Change Programme
including Delivering Excellence
Framework. Slow benefits realisation and
budget savings. Cuts in service provision
rather than service transformation 
Risk effect:
Objectives of change not actually met or
progress too slow. Adverse impact on
services Slow or delayed
proposals/savings arising from service
redesign. Potentially further eroding
reserves or requiring short term service
reductions which impact on Council's
ability to deliver against its priorities. Staff
morale negatively affected, Government
step-in short term savings instead of
transformation  
Finance Officer;
Chief Officer
Young People
and Partnerships              
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.R
A.02.03
Develop Medium Term Financial Strategy
with greater oversight, clearer
responsibility and accountability.
Q2 25/26: Refer to SPR.RA-02.03i
Chief *Executive;
Chief Finance
Officer;
30-June-2024  100%
SRP.R
A.02.04 Transformation Blueprint 2023 to 2028 Q2 25/26: Refer to SRP.RA-02.08
Chief *Executive;
Chief Finance
Officer; 
30-Jun-2028  20%                     
Page 109 of 134

Page 110

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
SRP.RR.03 Legal and Regulatory Compliance 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.03
Risk cause
Current or new legislation applying to
Midlothian Council.
Lack of capacity to resource statutory
obligations around GDPR, data protection,
records management, information
requests and statutory regulatory functions
such as fire safety/health & safety and civil
contingency/business continuity
requirements. 
Risk event
Council and or Services not identifying all
applicable legislation impacting Council
activities and Service requirements. 
Risk effect
Council failing to meet its statutory
obligations resulting in a potential negative
impact for service users or employees. 
Severe financial impacts due to
litigation/prosecution. 
Reputational impact of not meeting
statutory obligations.  
Head of *Adult
and Social Care;
Legal *and
Governance
Manager; Chief
Operating Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
1. Executive Directors, Chief Officer(s) and Head(s) of Service
responsible for identifying applicable legislation and propose Council or
Service responses to CMT and Cabinet/Council as required. 
2. Annual Assurance Statement. 
3. Internal Audit testing of internal controls as part of risk-based audit
plan. 
4. External Audit. 
5. Range of external inspection. 
6. BTSG oversight of new legislation 
7. Central repository of applicable legislation.  
5 5 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.R
A.03.02 Rights of the Child Bill
Q1 24/25: Bill now adopted. Policy to be presented to Council May/June 2024. 
Council wide group established and developing a plan that ensures we are all
aware and adhering to UNCRC. 
Executive Director
– People  31-Dec-2024  0%
SRP.R
A.03.05
Review of Standing Orders, Scheme of
Administration and Scheme of Delegation
Q4 24/25: Standing Orders and Scheme of Administration updated and
approved at Feb 2025 Council 
Legal &
Governance
Manager;
Executive Director
*Place; Chief
Officer Corporate
Solutions;
28 Feb 2027   40%
Page 110 of 134

Page 111

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
SRP.R
A.03.07
Review of policy and creation of a policy
register
Q1 25/26: Engagement sessions taking place with each Directorate to review
policy register 
Q4 24/25: Policy list presented to CMT May 2025 for CMT to review and
feedback.
Chief Officer
Corporate
Solutions
31-Dec-2025  40%
NEW Compliance with statutory duties
Q1 25/26: Progress Update Review for Records Management Plan submitted
and approved by National Records of Scotland and published online. 
Compliance Team establishment ongoing. Strategic Information Governance
Group established and Action Plan in development. 
Q4 24/25 : Resourcing proposal for a new Compliance Team being agreed by
Corporate Management Team. Funding to be identified through existing
Corporate Solutions budgets with implementation on a phased basis.  Now
proceeding to final stages of Managing Change process. 
Q1 24/25: Records Management Officer in post and reviewing the Records
Management Plan, Corporate Retention Policy and Schedule and supporting the
development of retention framework for M365 rollout.  
Chief Officer
Corporate
Solutions, Legal
and Governance
Manager 
31-Dec-2025  10% 
SRP.RR.13 Climate Change 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.13
Risk cause
Council Services not adequately engaged,
resourced or directed to fulfil the
requirements of the Climate Change Act. 
Risk event
Council Services not responding to the
Climate Change Act with sufficient pace. 
Risk effect Council failing to meet its
obligation under the Climate Change
(Scotland) Act 2009 and incurring the
associated reputational damage.  
Chief *Executive;
Executive
Directors and
Chief Officers..
1. Statutory requirement to report on compliance with climate change
duties. 
2. Council Carbon Management Plan 
3. Approval of a Corporate Climate Change Strategy and action plan 
4. CPP Board for Climate Change to bring strategic focus and oversight
of plans and progress. 
5. Resilience Seminars
5 5 
Page 111 of 134

Page 112

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.13.04
Delivery of the BTB Board Carbon Neutral
by 2030
Q1 25/26: Work continues on revised Climate Action Plan/Strategy. 
Q3 24/25: Council approved realignment of Net Zero target from 2030-2045. 
Q2 24/25: Member Briefing delivered. 
Planning,
Sustainable
Growth and
Investment
*Manager; Chief
Officer *Place; 
31-Mar-2030  0%
SRP.RA
.13.05
Development of the Strategic Plan 2023-
27
Q3 24/25:  Council approved realignment of Net Zero target from 2030 to
2045.  Climate Action Strategy refresh to follow. 
Planning,
Sustainable
Growth and
Investment
*Manager; Chief
Officer *Place; 
31-Mar-2025  90%  
SRP.RR.09 Emergency Planning and Business Continuity Management 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.09
Risk cause
The Council not preparing or timeously
reviewing Emergency Plans and testing
arrangements to respond to Civil
Contingencies Incidents. 
Risk event
There are a wide range of potential events
the Council may be expected to respond
to e.g., Severe weather incident,
Pandemic, infectious diseases, utility
disruption etc. 
Risk effect
Loss or degradation of service.
Loss or damage to buildings. 
Not adequately able to recover from the
losses, (e.g. staff, major facility such as
secondary school, main offices or
computer systems etc).
Not able to respond competently to a
major emergency in the community.
Head of *Adult
and Social Care;
Head of
*Development;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
David Robertson;
Chief Officer
Young People
and Partnerships
1. Community Risk Register used to highlight key risks. Council’s plans
developed and maintained in response to identified risks. 
2. Risk and Resilience Group support development, peer review and roll
out of plans. 
3. Establishment and service based contingency plans in place and
maintained.
4. Emergency response plan setting out general approach to respond to
a major emergency in-line with key partner organisations. 
5. As part of the Council’s Emergency response the importance of
recording decisions made and information available at the time is
highlighted as this would be scrutinised in the event of an FAI. 
6. Care for People Group – support for those affected by emergencies
plus various international asylum cohorts.  
4 5 
Page 112 of 134

Page 113

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Loss of life, livelihoods and property due
to inadequacy of response. 
Reputational consequences and damage.
Prosecution through non-compliance with
the Civil Contingencies Act.
Fatal Accident Inquiries.
Costs.                 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.R
A.09.02 Development of Emergency Plans
Q2 25/26:  As Q1 25/26 for service review.   
Plans and Procedures updated: 
Emergency Contacts Directory (reflecting staff changes)    
Business Continuity (BC) Planning:  
The draft Corporate BC Plan update reported in Q1 awaiting
approval/comments. 
In collaboration with Digital Services, the information on the previous
Emergency Planning and Business Continuity Intranet Portal has been made
available via the front page of Mid-Hub.  There is a specific area for Business
Continuity which will be further developed in the coming months 
There is regular, scheduled liaison with Cyber Security specialists in Digital
Services.    
CONTEST/Prevent:  
Support is given to the CONTEST and Prevent SPOC on an ongoing basis,
including representation at multi-agency meetings on behalf of the SPOC.  
Pertinent guidance and information is hosted on the Emergency Planning site on
Mid-Hub. 
Drafted, on behalf of the CONTEST SPOC, the Midlothian Council response to a
Scottish Government questionnaire relating to Protect and Prepare. 
Monitoring of progress with The Terrorism (Protection of Premises) Act, also
known as “Martyn’s Law”.  National guidance is awaited which will assist
organisations in complying with the Act.  There will be at least a 24 month
implementation period (from April 2025). 
Ongoing routine representation at/participation in:  
Internal meetings requiring a Contingency Planning input, including Care for
People, Estates Safety and Management Groups  
Support to services for Business Continuity activities  
Chief Officer
*Place; Senior
Manager
Protective
Services; David
Robertson
31 March 2026   25%
Page 113 of 134

Page 114

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Torness Emergency Planning Consultative Group meetings and other Torness
multi-agency meetings requiring representation from Midlothian Council. 
Local Authority Resilience Group Scotland (LARGS) - networking meetings of
resilience practitioners  
General resilience support to colleagues as required.  
Lothian and Borders Local Resilience Partnership meetings. 
Undertook/facilitated:  
Ongoing monitoring and circulation of information and liaison with services
regarding the Public Switched Telephone Network switch-off (in conjunction with
Digital Services).     
Training and Exercising:  
Attended information sessions, and provided briefings to senior colleagues, on a
national pandemic exercise scheduled for Autumn 2025.  The exercise takes
place in three phases, the first one was held in Q2, the remaining phases will be
in Q3.  Drafted the Midlothian Council contribution to the Lothian and Borders
Local Resilience Partnership’s response to the Phase 1 scenario.  The exercise is
ongoing.  
Nominations have been submitted for a counter-terrorism exercise is being held
by the Lothian and Borders Multi-Agency CONTEST Group in November 2025.   
NOTES: 
Following attendance at meetings, seminars, presentations, training sessions, a
summary of all pertinent information is forwarded to senior manager(s) and
other colleagues as appropriate. Invitations are also forwarded where the
subject might be of direct interest to other services/partners.   
Progress with review of emergency plans and business continuity arrangements
has been hindered this quarter due to a combination of the reduced resource
and annual leave. 
Q1 25/26: As Q4 24/25. The service review for the Health, Safety and
Resilience Team Service, which includes Contingency Planning, requires to
progress to implementation stage. 
SRP.R
A.09.03 Business Continuity Software System Q2 25/26: Not renewing Clearview software. Sharepoint to be utilised.
Resource requirements identified within service review for business continuity.
Chief Officer
*Place; Senior
Manager
Protective
Services; David
Robertson
31-Dec-2025   25%   
Page 114 of 134

Page 115

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
SRP.RR.16 Growing Council 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.16
Risk cause
Population growth in Midlothian over the
next 10 to 15 years will see Midlothian
become the fastest growing Council in
Scotland. 
Between 2014 and 2039, ages 0-15yrs,
population is projected to increase by 20%
and for ages 75+ population projected to
increase by 100%. 
Risk event 
Failure to resource and plan for these
rises will significantly impact the Councils
ability to fulfil its statutory obligations in
relation to these groups. 
Risk effect Inadequate capacity within the
school estate to cope with the projected
increase in pupil numbers. Insufficient
provision to support an aging population
placing costly inefficiencies on other parts
of the care sector. General population
increase placing additional demand on
infrastructure including GP services.
Increased pressure on infrastructure,
services e.g., waste collection and growth
of road network as new development
roads are adopted. 
Head of *Adult
and Social Care;
Chief *Executive;
Executive
Director *Place;
Fiona
*Robertson;
Chief Officer
Young People
and Partnerships
1. Local development plan and supplementary guidance on developer
contributions. 
2. Services planning future service provision on the basis of anticipated
service demands 
3. The change programme 
4. Learning Estate Strategy 
5. Capital Plan Prioritisation 
6. Strategic Housing Investment Strategy 
7. Rent Review Strategy 
8. Joint needs assessment used to develop - IJB Strategic Plan 
9. Capital Plan and Asset Management Board will scrutinise and
challenge slippage on capital programmes recognising that slippage can
have an adverse impact on financial sustainability and also the delivery
on assets required to support capital growth. 10. City Deal provides the
opportunity to support inclusive growth.  
4 4 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.02.06 Capital Plan prioritisation
Q2 25/26: Building Asset Management Plan approved by Council. Fleet Asset
Management Plan and Digital Asset Management Plans are under development
and are key parts of finalising the Capital Plan Prioritisation exercise. 
Q1 25/26: Work evaluating information flowing from building condition surveys
continues with a view to presenting a draft building Asset Management Plan to
Council in October. 
Head of
*Development;
Executive Director
*Place; Chief
Finance Officer; 
31-Oct-2024  75%
Page 115 of 134

Page 116

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Q4 24/25: Council in February received an update on Capital Plan Prioritisation
work and made a decision on an updated Learning Estate Strategy. The extent
and affordability of work flowing from building condition surveys is being
assessed and will be concluded and reported to Elected Members early in
2025/26. 
SRP.RR.14.1 Scottish Child Abuse Inquiry 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.14.1
Risk Cause: Midlothian Council and its
legacy organisations, predating the
creation of Midlothian Council in 1996,
have been involved in the provision of
care of children going back to living
memory. During this time there is the
likelihood that the care children received
fell below standards of care now in place.
There is the further potential that some
people in the care of Midlothian Council
and its legacy organisations were subject
to abuse by those who were employed to
care for them. 
Risk Event: The Scottish Government
began an Inquiry into cases of Child
Abuse occurring prior to 17 December
2014, the intention of this enquiry is to
identify historic case of abuse which have
to date gone unreported. 
The most recent Section 21 notice around
the Foster Care Case Study is a
significant piece of work. The request for
information from 1930 to date is very
challenging given the volume of files that
require to be read and analysed. 
Risk Effect: If the inquiry finds historic
cases of abuse in Midlothian this could
damage the reputation of the Council and
could place doubt in the eyes of the public
as to the safety of those currently in care.
There is significant scope for a substantial
financial impact arising from claims of
Chief *Executive;
Chief *Social
Work Officer 
The Council initially set up an Inquiry Project Team, however this is no
longer required as we have an experienced worker overseeing all
requests for the Scottish Child Abuse Inquiry Team. 
Work is ongoing and we have the additional tasks of supporting and
responding to enquiries from the redress team. 
The Inquiry Team have established a Project Plan covering: 
1. Residential establishments, List D Schools and Foster Carers:
identifying Children’s homes, Foster Carers and any List D Schools in
Midlothian over the last 100 years and researching historic records. 
2. Record Audit: reviewing the Council’s existing paper and electronic
recordkeeping systems to identify relevant records and map them to
residential establishments. This also includes, where possible, noting the
Council’s historic recordkeeping policies, such as retention schedules. 
3. Cataloguing/Indexing: checking and updating existing recordkeeping
systems for accuracy and consistency, enabling effective information
retrieval when requested by the Inquiry. 
The Project Team have established a Project Plan covering: 
4. Ascertaining the succession and insurance position in relation to
potential historic child abuse claims. 
5. Ascertaining and agreeing Midlothian Council’s legal position/
approach in dealing with the potential historic child abuse claims. 
6. Identifying the need for guidance, protocol, templates etc. should/if any
claims be made against the council. 
7. Project team is in place with project plan with a range of identified
actions which are being progressed. Monthly meetings to progress
project plan. 
8. The SCAI Social Worker is very competent and experienced in this
area of work and provides quarterly updates on their findings from the file
read. This is a real strength within this area of work. The CSWO and
4 4 
Page 116 of 134

Page 117

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
historic abuse. Some existing employees
may be affected by the inquiry and
subsequent claims of abuse. 
To date there has been no evidence from
the extensive file read to suggest there
has been systemic abuse within our foster
care system. 
Principal Solicitor meet regularly with the social worker to discuss
findings from the file read. 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.R
A.14.03
Foster Care and Residential Care File
Review  Q3 24/25: Phase 10 is now in progress with investigation of residential care
homes run by local authorities. We will comply with all s21 requests. 
Childrens Services
Management
Team; Chief
*Social Work
Officer;  Chief
Officer Young
People and
Partnerships
31-Mar-2024  100% 
SRP.RR.19 Health & Safety/Fire 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.19
Risk cause
Failing to identify and rectify non-
compliance with Health and Safety
regulations. 
Risk event
Reactive rather than pro-active
organisational health and safety culture.
Employees/Managers not adequately
trained. 
Employees required to undertake tasks in
which they are not trained or competent. 
Statutorily driven health and safety
protective arrangements for service users
and employees not implemented
sufficiently or correctly. 
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
David Robertson;
1. Health Safety and Wellbeing Strategy & Service Plan. 
2. Suite of Health and Safety Management Arrangements developed
setting out council response to statutory obligations. 
3. Use of Health & Safety Management Information System (SPHERA) to
enhance information transfer and organisational efficiency. 
4. Training programme in place to support those with responsibility for
managing health and safety.
5. Programme of fire risk assessments.
6. Estate Safety & Maintenance Groups for prioritising any matters
requiring escalation. 
4 4 
Page 117 of 134

Page 118

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Non-compliance with policy and
procedure.
Serious fire leading to loss of life and
property.
Health and Safety team inadequately
resourced to promote or implement pro-
active measures or train managers/staff.   
Audits and inspections not being
undertaken to confirm adherence to policy
and legislative requirements.
Loss of highly experienced staff due to
partial or full retirement.  
Risk effect 
Death, serious injury or ill health impact on
employees and/or service users. 
Loss or damage of Council property.
Negative impact on outcomes for
customers and service users. 
Severe impacts on delivery of services
due to staff absences.
Service users and employees exposed to
hazards where statutory requirements
exist. 
Statutory health and safety duty of care to
services users and employees not met. 
Statutory notices and/or prosecution by
HSE or SFRS resulting in significant fines. 
Criminal prosecution of the Corporate
body and or individuals through Corporate
Homicide (Corporate Manslaughter). 
Reputational damage.
Significant costs incurred to Council due to
insurance claims, loss of services, plant or
buildings.  
Chief Officer
Young People
and Partnerships                
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
NEW 
Health, Safety & Resilience Service
Review 
Q2 25/26: As Q4 24/25. 
Q1 25/26: As Q4 24/25. 
Q4 24/25: The service review for the Health, Safety and Resilience Team
Service needs to progress to implementation stage. 
Chief Officer
*Place; Senior
Manager
Protective
Services; David
Robertson
31/10/2025  0%
Page 118 of 134

Page 119

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
SRP.R
A.19.01
Delivery of Health, Safety and Wellbeing
Service Plan Q2 25/26: Service Plan to follow service review. 
Chief Officer
*Place; Senior
Manager
Protective
Services; David
Robertson
31-Mar-2025  0%
SRP.R
A.19.07
H&S fire safety audit across all Council
estate 
Q2 25/26: Progress with fire risk assessments on a priority basis.   
Q1 25/26: Fire Risk Assessment work plan started – priorities being premises
with sleeping risks, schools, depots, main offices, leisure centres and libraries. 
Chief Officer
*Place; Senior
Manager
Protective
Services; David
Robertson
31-Mar-2026  20% 
SRP.RR.21 Cyber Security  
Risk Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.21
Risk Cause
Malicious attempts to damage, disrupt or
gain unauthorised access to Council
computer systems, networks or devices. 
Risk Event
The cyber threat is severe and
advancing quickly. The Council is at
significant risk of cyber-attack from
Ransomware Phishing Emails, Advanced
Persistent Threats (APT) and Distributed
Denial of Service Attacks (DDOS)
attacks. Hacking and Social Engineering. 
Risk Effect
Access to Council systems by cyber
criminals and foreign intelligence
agencies for financial, commercial or
information gathering reasons. This
could lead to significant financial losses,
data compromise and subsequent
regulatory sanction if our technical and
organisational measures are deemed
Head of *Adult
and Social Care;
Cyber Security
Information
Governance and
*Compliance
Manager; Head
of *Development;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place;
Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
David Robertson;
Chief Officer
Young People
and Partnerships
1. Implementation of and compliance with the Scottish Government
Cyber Resiliency Public Sector Action Plan 
2. Cyber Essentials Plus Certification 
3. Public Sector Network Certification 
4. Regular Audits and Inspections
5. Appropriate technical and organisational measures deployed to
reduce the likelihood and impact of an attack 
6. Having adequate skills and knowledge in the organisation 
7. Implementing Scottish Government Cyber Security Action Plan
8. Adoption of the NCSC (National Cyber Security Centre) Active
Cyber Defence programme  
9. Technology upgrades
10. Incident Response plans and exercises
4 5 
Page 119 of 134

Page 120

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
insufficient. Severe business disruption
including the almost total loss of critical
IT systems and networks leading to
significant service delivery challenges.                  
Related
Action Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.21.1 Appropriate Technical and
Organisational Measures 
Q2 25/26
Work continues this quarter to maintain and strengthen our cyber security.
Key successes this quarter include:     
• Digital Services completed a detailed DWP security audit.  
• A penetration test of the schools network was conducted 
• Successfully defended the organisation against multiple cyber
attacks. 
• Security oversight was provided for the onboarding of several new
applications and technical services 
• A SOC (security operations centre) and CIR Cyber Incident Response
tender) was prepared and issued  
Q1 25/26 
Work continues this quarter to maintain and strengthen our cyber security.
Key successes this quarter include:     
1. Cyber Essentials Plus Certification and PSN Certification were
successfully achieved, demonstrating compliance with national
standards. 
2. Successfully defended the organisation against multiple cyber
attacks. 
3. A confidential Cyber Defence Briefing Note was submitted to CMT
following high-profile UK cyberattacks, including one targeting West
Lothian’s education network. 
4. Security oversight was provided for the onboarding of new
applications and technical service 
Cyber Security
Information
Governance and
*Compliance
Manager
31-Mar-2027  75% 
Page 120 of 134

Page 121

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
SRP.RR.08 Asset Management – Buildings, Vehicles,  Roads and Digital Assets/Networks 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.08 
Risk cause
Many of the assets the Council own by
their nature are in a position of ongoing
deterioration through their normal use,
e.g., roads - normal wear and tear,
streetlights and vehicles & buildings used
to deliver services. 
Risk event
Many assets will deteriorate under normal
conditions although buildings, roads and
streetlights as an example can be
damaged during more extreme weather
events or as a result of a lack of
maintenance. 
Risk effect
In the case of Roads Services there is a
real risk of increased potholes and
insurance claims, reduced skid resistance
leading to higher accident potential and
building up of higher costs in the future. In
respect of vehicles, increased
breakdowns, service failures, greater
maintenance inevitable, higher short-term
hire costs. In terms of property, health and
safety issues arise, failure to meet current
standards and higher running costs. There
is also the risk of two-tier accommodation,
some high quality, some low. 
Head of *Adult
and Social Care;
Head of
*Development;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
1. There is provision in place within the capital plan for investment in the
asset base. 
2. Asset register 
3. Condition Survey 
4. Understanding of future asset needs 
5. Asset Strategy: 
. Roads 
. Land 
. Fleet 
. Digital Service Network 
. Digital Service hardware 
6. Capital programme - investment in estate. 
7. Ongoing monitoring of properties by: Maintenance Surveyors,
Facilities Management and Property Users. 
8. Established Capital Plan and Asset Management Board and dedicated
Asset Management Board 
9. Establishment of 7 thematic Estate Safety and Management Groups
chaired by Chief Officer Place 
10. Building Accessibility Strategy 
11. Completion and approval of Asset Management Plans 
3 5 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.R
A.08.02
Plan for appropriate investment in capital
works and remedial maintenance over the
lifespan of each property asset.
Q2 25/26: Q2 25/26: Building Asset Management Plan approved by Council.
Fleet Asset Management Plan and Digital Asset Management Plans are under
development and are key parts of finalising the Capital Plan Prioritisation
exercise. 
Chief Officer
*Place;  30-Apr-2025  33%
Page 121 of 134

Page 122

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Q1 25/26: Asset management plan for Property & Estate drafted. Due to be
finalised and issued to Council in Q2. Updated governance for asset
management included. Asset management plans for Fleet also approved at
Council. 
Q3 24/25:  Condition Surveys of Learning Estate (excl PPP) has concluded.  Q4
presentation to Elected Members.  Backlog repairs continue. 
Q1 24/25: Condition Surveys continue, with Learning Estate (excl PPP)
expected to be concluded by end December 2024 to inform capital investment
proposal. 
SRP.R
A.08.05 Learning Estate Strategy
Q1 25/26 Learning Estate Strategy 
Is currently being implemented with the focus on the delivery of the LEIP funded
projects of Mayfield, Beeslack and Penicuik. Shawfair Campus project has been
approved and design being developed.
Learning Estate
Programme
Manager 
30-March 2026  50%
SRP.R
A.08.06
Asset Management systems 
Q225/26: Q2 25/26: Building Asset Management Plan approved by Council.
Fleet Asset Management Plan and Digital Asset Management Plans are under
development and are key parts of finalising the Capital Plan Prioritisation
exercise. 
Q1 25/26: Asset management plan for Property & Estate drafted. Due to be
finalised and issued to Council in Q2. Updated governance for asset
management included. Fleet Replacement Programme approved. 
Head of
*Development; 31-Mar-2025  50% 
SRP.RR.22 Cost of Living Crisis 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.22 
Risk cause
The UK is currently facing an
unprecedented storm of increasing prices,
bills and tax. A 40-year high inflation rate
of 9% is the main driver of the cost-of-
living crisis which has outstripped wage
and benefit increases. 
Chief *Executive;
Director *Health
and Social Care;
Executive
Director *Place
1. Council Cost of Living Task Force to oversee the Council’s response
to the crisis 
2. Allocation of LACER funding to support those most affected 
3. Strategic Evaluation Partner appointed to create poverty profile 
4. Community Planning Partnership has established a Midlothian
Strategic Poverty Prevention Group co-chaired by Council Leader and
Director of Public Health 
5. New Child Poverty chair and lead appointed (Executive Director
Children, Young People and Partnerships) 
6. Child Poverty self-evaluation underway with Improvement Service  
3 5 
Page 122 of 134

Page 123

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Risk event
Rapid ongoing rise of energy prices as
well as food and drink prices. 
Risk effect The impact on households is
already being noted with 87% of adults in
the UK reporting an increase in their cost
of living in April 2022 (Office for National
Statistics; Francis-Devine et al, 2022). The
price rises will impact low-income
households the hardest as a larger
proportion of their bills are on energy and
food.                
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.R
A.22.1 Cost of Living Task Force Q1 23/24: Meetings continuing.   Chief *Executive;  31-Mar-2024  100%  
SRP.RR.23 Counter Terrorism – Compliance with Legislation 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.2
3
Risk cause
Current or new legislation applying to Midlothian Council.
Lack of capacity to resource the statutory obligations. 
Risk event
Council and/or Services not identifying all applicable
actions.
The CONTEST and Prevent action plans fall short of
what is required 
Risk effect
Council failing to meet its statutory duties, potentially
resulting in a negative impact on the safety of employees,
service users and visitors to Council facilities.
Reputational impact of not meeting statutory duties. 
Chief Officer
Children’s
Services,
Partnerships
and
Communities
1. There is a CONTEST Lead and Depute (Single Point of
Contact (SPOC)) in place.  These individuals are also the
nominated Prevent SPOC and Depute SPOC.
2. There are designated, trained officers available to Chair
Prevent related case conferences (Prevent Multi-Agency
Panel).
3. There is a Midlothian CONTEST Group chaired by the Chief
Officer Children’s Services, Partnerships and Communities.
Membership includes representatives from services in both
Council Directorates and the Midlothian Health and Social
Care Partnership plus key external partners.  Terms of
Reference are in place.
4. Executive Directors, Chief Officers and Heads of Service are
responsible for ensuring that their services comply with
allocated actions and identifying any concerns and additional
actins required.
5. An annual report on CONTEST activities is submitted to the
Corporate Management Team.
6. Prevent assurance Statements are required by the Home
Office and Scottish Government every two years.
3 4 
Page 123 of 134

Page 124

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
7. Scottish Government may also require additional CT reports at
various times.
8. Relevant information and updates received from external
partners and organisations are disseminated to CONTEST
Group members and others as appropriate.
9. E-learning CONTEST related modules, including Prevent
products are Mandatory.  In-person and written briefings are
available to other staff groups who do not have access to e-
learning or for whom the full briefing is not appropriate. 
Risk Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.23.
01
Review and implement the recommendations from the
Prevent Assurance 2025 process.
Q2 25/26 Feedback with recommendations have been received from Home Office. 
Q4 24/25.  The Home Office is due to provide feedback on the Midlothian Council
Prevent Assurance 2025 submission.  Communication during the process indicated
that guidance would be given in respect of at least one of the assessment areas. 
Chief Officer
Children’s
Services,
Partnerships
and
Communities
June 2026  0%
SRP.RA.23.
02
Terrorism (Protection of Premises) Act 2025:  Implement
the requirements of the Act as they become clear through
Government guidance.
Q4 24/25.  New legislation.  The Terrorism (Protection of Premises) Act 2025 (also
known as Martyn’s law) received Royal Assent on Thursday 3 April.  The Government
intends for there to be an implementation period of at least 24 months before the Act
comes into force. This period will enable those responsible for premises and events to
have sufficient time to understand their new obligations, and to plan and prepare
accordingly. 
Whilst those that fall within scope of the Act may wish to consider the requirements,
there is no requirement to comply with them until the legislation comes into force. The
Home Office will publish statutory guidance during the 24-month implementation
period.  
Chief Officer
Children’s
Services,
Partnerships
and
Communities
2027  0%  
SRP.RR.04 Employee performance 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.04
Risk cause
Employees not suitably trained/developed
for the roles required of them. 
Limited availability of qualified
practitioners in certain sectors. 
Change program not informed by all key
stakeholders. 
Ageing work force. 
Employees unclear on expected
behaviours. 
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Over-riding risk control measure = Focus on having the right people,
here, healthy, performing, behaving and well led via effective utilisation of
the workforce strategy and accompanying action plan. 
Approval of the Council’s Workforce Strategy 2024-2034 which
focuses on the thematic areas below:  
Attendance / Wellbeing
1. Continuing implementation of the Wellness@Midlothian agenda. 
2. Creation of an Employee Health and Wellbeing Strategy and
supporting policy. 
3 4 
Page 124 of 134

Page 125

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Employees constrained to innovate as a
result of management practice. 
Employee productivity rate below the
required level because of ineffective use
of the People Policies particularly
Maximising Attendance. 
Salaries in some functional areas lower
compared to other LA’s resulting in
recruitment issues particularly with trying
to recruit experienced staff. 
Risk event
Employees not engaged/consulted as part
of organisational transformation. 
Experienced employees leaving the
organisation. 
Inability to recruit suitably qualified /
trained staff to fill vacancies negatively
impacting on remaining workforce. 
Unacceptable behaviours demonstrated
by employees. 
Stated organisational culture not
consistently reinforced by managers. 
Poor employee performance will stifle
transformational change. 
Risk effect
Difficulties recruiting the right staff. 
Challenges retaining quality staff. 
Low skill levels. 
Low morale, especially during change. 
High absence rates, loss of experience in
service areas. 
‘A Great Place to Grow’ our values
including respect, collaboration, pride and
ownership not realised, potentially
resulting in missing the opportunity to
capitalise on the abilities, experience and
ideas of team members. Poor employee
performance will Exacerbate the financial
challenge. 
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
HR Strategic
Lead; Chief
Officer Young
People and
Partnerships
3. Maintaining the Healthy Working Lives Gold Award. 
4. Proactive use of Occupational Health, Midlothian Physiotherapy,
Employee Assistance Programme and the Workplace Chaplaincy
Service. 
5. Change of EAP supplier to ensure provision of best possible service. 
6. Development of progressive People Policies. 
7. Roll-out of mental health training for staff and managers. 
Performance
1. Service-level workforce plans. 
2. Structured, robust, well established ‘Making Performance Matter’
Framework where expected standards of behaviour and Council values
are re-enforced. 
3. Continued re-enforcement of all People Policies involving various
communication methods. 
4. Development of a suite of management information to ensure Service
Managers are informed e.g., turnover, absence levels/reasons etc. 
Organisational Change
1. Policy for Organisational Change includes strong emphasis on early
engagement of employees. 
2. Redeployment Procedure to ensure maximum chance of successful
redeployment. 
Conduct
1. Resolution Policy encourages early intervention of workplace issues. 
2. Professional standards and values build into the induction process and
management development programme. 
Communication
1. A range of initiatives to keep staff informed of change (Chief
Executive’s weekly email, Connect, All staff emails, tailored team
briefings etc.     
Page 125 of 134

Page 126

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.02.04
Development and Delivery of the Council’s
Workforce Strategy 2024-34 including
analysis of future workforce requirements,
gap analysis and gap closing strategies,
and performance measures and target
setting.
Q2 25/26: 
Q1 25/26: Workforce Planning workshops completed with HR/OD team. Next
session with CMT scheduled in September then onwards to Council Senior and
Service Managers for full rollout. 
Q4 24/25: Council approved the Workforce Strategy 2024-2034 in December
2024. Work progressing on the delivery of the first three years through an
agreed action plan. Acting HR Strategic Lead appointed. Two interim posts from
BTB funding are being progressed for Talent and Reward. 
Q1 24/25: Workforce Strategy in development and expected to be presented
to December Council with Action Plan for approval. Audit Scotland external audit
on workforce and digital to be presented to Audit Committee September 2024. 
Chief Officer
Corporate
Solutions 
31 Dec 2027   25%
NEW
Recruitment challenges in Procurement
Service leading to contract management
pressures and backlog in procurement
exercises
Q1 25/26: Procurement Manager in place. Additional Procurement Assistant
resource (fixed term) onboarded August 2025. Category management
realignment agreed and handover in progress. Business partnering model to
commence in September 2025. Contract management framework drafted and in
review. Contract register updated quarterly and published online. Pipeline in
development for each category. 
Q4 24/25: Procurement Manager appointed to start on 1 June 2025. Chief
Officer Corporate Solutions to implement an improvement plan and revised work
plan for the service and develop business case for appropriate resourcing.
Chief Officer
Corporate
Solutions  31 Dec 2025  10%  
SRP.RR.07 Care at Home 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.07
Risk cause
Internal and External providers of Care at
Home services unable to meet service and
quality requirements as a result of a lack
of capacity. 
Risk event
Capacity of Community Support
outstripped by demand. 
Head of *Adult
and Social Care;
Director *Health
and Social Care
1. Care at Home winter assurance plan and business continuity plan
complete 
2. Development of Care at Home Service Improvement action plan 
3. External commissioning complete and ongoing contract monitoring in
place 
4. External provider audits complete 
5. Re-established Multi-Agency Quality in Care at Home quarterly review
meetings jointly with East Lothian 
6. Weekly provider meetings in place 
3 4 
Page 126 of 134

Page 127

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Risk effect
There is a risk that patients will have their
discharge delayed because there is
insufficient community supports to enable
timely discharge leading to deterioration in
their health, beds being blocked and
elective operations being cancelled.  
7. Additional locum team members and contracts with agency staff in
place 
8. Daily discharge meeting with Multidisciplinary and Multi-agency team
planning to plan and coordinate discharge to ensure care at hone support
in place                  
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.R
A.07.01
Independent review of adult and social
care
Q3 24/25: Scottish Government announced in January 2025 that they will not
be proceeding with the National Care Service. 
Q2 24/25: The Scottish Government has initiated a pause on the development
of the NCS. 
Head of *Adult
and Social Care;
Chief *Executive; 
31-Jan-2024  100% 
SRP.RR.10 Governance and Standards in Public Life 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.10
Risk cause
Code of conduct for Members and
employees’ actions falling short of
International Standards. 
Risk event
Failure in openness, accountability, clarity. 
Risk effect Service, partnerships and
project outcomes not achieved. Non-
compliance with conduct standards and
reduction in standards in public life.  
Legal *and
Governance
Manager; Chief
*Executive; Chief
Officer *Place;
Executive
Director *Place;
Chief Officer
Corporate
Solutions
01 Annual Assurance Statement. 
02 Standing Orders 
03 Scheme of Administration 
04 Scheme of Delegation 
05 Elected Member Code of Conduct 
06 Induction programme for new members and ongoing learning and
development programme 
07 Employee Code of Conduct  
2 4 
Page 127 of 134

Page 128

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.03.05
Review of Standing Orders, Scheme of
Administration and Scheme of Delegation
Q4 24/25: Standing Orders and Scheme of Administration updated and
approved at Feb 2025 Council. 
Q1 24/25: Workplan presented and agreed by SOWG in April 2024. Some
changes to SOs and Scheme of Administration presented and approved by
Council in May 2024. 
Legal *and
Governance
Manager; Chief
Officer Corporate
Solutions; 
28 Feb 2027  20%
SRP.RA
.10.03
Review of the employee onboarding and
induction programme
Q1 25/26: Content for online induction now finalised – in design phase prior to
launch in Autumn. Next step is face to face induction programme. 
Q4 24/25: Work ongoing to finalise the refreshed induction programme and
onboarding process 
Chief Officer
Corporate
Solutions
31-Dec-2025  5%   
SRP.RR.12 Internal Control Environment 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.12
Risk cause
Work procedures/process inadvertently
create the capacity for fraud and waste to
occur. 
Internal Controls requiring more time,
effort or cost than the risk being managed. 
Mangers failing to follow procedures and
keep systems updated with accurate
information. 
Risk event
Persons exploiting opportunities to commit
fraud. 
Waste and errors 
Changing risk landscape associated with
remote working solutions. 
Risk effect
Waste and loss 
Risks over managed with risk controls
costing more than the potential loss being
managed. Increased opportunity for fraud
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
1. Services have been prompted to consider fraud and waste within
Service Risk Registers. 
2. Risk Management Guide provides direction on the need to balance
time, effort and cost against benefit of risk controls. 
3. Internal Audit examine internal control arrangements based largely on
the risk registers. 
4. Corporate Fraud team in place who assist managers to undertake
fraud risk assessments in their areas (focused on priority areas) and
provide advice and guidance on fraud related matters. Active
participation in the National Fraud Initiative to investigate matches. 5.
Whistleblowing Policy and Counter Fraud Policy in place (subject to
review) with whistleblowing channels available to report concerns
(anonymously if required). 
6. Internal and external assurance. Annual Governance Statement which
involves obtaining assurance from Management over controls in their
Service. 
7. E-learning for staff to complete mandatory training for fraud
awareness. 
8. Regular updates to Audit committee on progress with
recommendations made by Internal Audit. 
9. Remind staff to declare secondary employment/outside interests and
gifts & hospitality 
2 3 
Page 128 of 134

Page 129

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
or financial loss has direct impact on
management information. Has adverse
effect on service performance.  
10. Induction for all new employees (with service exceptions), including
legal, HR, procurement, health and safety. Control at entry to
organisation. 
11. The Integrity Group continues to meet to improve the Council’s
resilience to fraud, corruption, theft and crime (including cybercrime),
maintaining proper risk management, governance and internal control
processes and systems to ensure probity in systems and operations, and
mitigation of risks, including the prevention, detection and resolution of
fraud and irregularities. Management is also responsible for checking that
the arrangements and controls are operating effectively and obtaining
assurances from internal compliance, risk, inspection, quality, and control
functions.               
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.R
A.12.04
Review of Serious Organised Crime
(SOC) group
Q2 25/26: A recent change in Police management covering this area has
meant that progress has been delayed. Anticipating re-engagement in Q3. 
Q3 24/25: Draft Strategy devised.  Regulatory safeguards/actions progressing
through Licensing. 
Q1 24/25: Initial meeting with Police is planned to discuss strategy. 
Chief Officer
*Place; Health,
Safety &
Resilience
Manager
31-Mar-2025  50%   
SRP.RR.11 Corporate Policies and Strategies 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.11
Risk cause
Policies may not match the aspirations of
the Council's Strategic priorities or cultural
perspective. 
Risk event
Policies not monitored may become out of
date. Policies not reviewed to ensure
alignment with strategic priorities. 
Risk effect Policies not monitored could
result in non-compliance with legislation
Policies not aligned to strategic priorities
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
1. Single Midlothian Plan providing overarching direction 
2. Service plans aligned to Single Midlothian Plan. 
3. Leadership team to ensure correct approaches are adopted to get the
right results. 
4. Strategic housing investment plan, submitted to Scottish Government. 
5. Capital Strategy 
6. Integrated Joint Board (IJB) Plan 
7. IJB Strategic needs assessment 8. Midlothian Local Development Plan
2017 – the Council’s corporate spatial strategy.  
2 3 
Page 129 of 134

Page 130

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
will inhibit rather than support
implementation of strategic priorities.  
Finance Officer;
Chief Officer
Young People
and Partnerships                
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.02.04 Transformation Blueprint 2023 to 2028 Q2 25/26: Refer to SRP.RA-02.08 
Chief *Executive;
Chief Finance
Officer; 
30-Jun-2028  20%
SRP.RA
.03.07
Review of policy and creation of a policy
register
Q1 25/26: See comments earlier in SRP. 
Q4 24/25: Policy list presented to CMT May 2025 for CMT to review and
feedback 
Chief Officer
Corporate
Solutions
31-Dec-2025  10%
SRP.RA
.11.05 Antisocial Behaviour Policy
Q1 24/25: Member Briefing on Housing and Antisocial Behaviour to be
prepared and presented during Q2, with report to Council to follow.  Chief Officer
*Place;  31-Dec-2024  0% 
Page 130 of 134

Page 131

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Strategic Opportunities 
SRP.OP.08 Capital Projects - Housing 
Risk
Code Risk Identification Managed by Risk Commentary Risk Evaluation
SRP.O
P.08
Cost of delivering Affordable Housing
Supply Programme has risen at faster rate
than available grant to Midlothian and
continued high build costs will affect ability
to deliver housing programme. 
Policy requirement to deliver 25%
affordable on new housing sites under
significant pressure due to grant level not
growing with housebuilding rate. More
sites will be unable to delivery subsidised
homes for rent due to shortfall in grant. 
Projects progressing, with Timeline,
Budget, Risk and Resource categorised
as parameters on a RAG status, with any
Red classifications identified and reported.   
Executive
Director *Place;
Head of
Development
1. Edmonstone Road, Shawfair – Timeline, Budget and Risk impacted
with Stewart Milne entering administration.  However, site now amber
due to appointment of Dundas Building to finish site. Now on site. 
2. Newtongrange Former Pool & Church Hall sites. Requirement to
deliver 3D modular units on site. V limited Scottish suppliers for 3D due
to Connect going into administration. VfM to be examined in tender report
in Q2. 
Phase 5 housing programme has been reviewed to ensure affordability
within the Housing Revenue Account. Grant level now restored which is
to be used for acquisitions to address temporary accommodation
pressures. However, high level of housing delivery and restored grant
insufficient to support all housing sites to deliver subsidised 25%
affordable homes. 
Timeline Budget Risk Resource
A A A G
A A A G 
SRP.OP.09 Capital Projects – Transport, Net Zero & Infrastructure 
Risk
Code Risk Identification Managed by Risk Commentary Risk Evaluation
SRP.O
P.09
Cost of delivering enabling infrastructure
projects has risen, resulting in significant
funding gap emerging. 
Expansion of scope by Transport Scotland
and restrictions on timing of ecology
surveys driving further cost and timing
risks. 
Projects progressing, with Timeline,
Budget, Risk and Resource categorised
as parameters on a RAG status, with any
Red classifications identified and reported.  
Executive
Director *Place;
Head of
Development  
1. A701 Relief Road
2. A701 Sustainable Trasport Corridor
3. A701 Straiton Junction Improvements 
For all highlighted projects, estimated cost significantly exceeds budget
available to deliver project. 
For all highlighted projects, addressing requirement for investment in
A701 corridor in phases with prioritisation applied. Bush Loan Junction
progressing ahead of remaining programme fully funded by Edinburgh
and South East Scotland City Regional Deal (ESESCRD) funding. 
Timeline Budget Risk Resource
R R R G
R R R G
R R R G
Page 131 of 134

Page 132

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
SRP.OP.10 Capital Projects – Children, Young People & Partnerships Estates Programme: Primary 
Risk
Code Risk Identification Managed by Risk Commentary Risk Evaluation
SRP.O
P.10
Projects progressing, with Timeline,
Budget, Risk and Resource categorised
as parameters on a RAG status, with any
Red classifications identified and reported.  
Executive
Director *Place;
Executive
Director CYPP;
Head of
Development  
1. Mayfield/St Lukes PS New Build: Cost reduction exercise complete,
Contract signed, Site start on 30th June 2025, with school expected
to open February 2027.
2. Mauricewood PS Extension & Refurbishment: Rising roll and
catchment review requires investment in school to address capacity
and suitability. Limited budget available.  Funding insufficient as
some contributions were withdrawn for pay for costs of previous
extension. Paper to CPAMB to seek approval to provide 6
classrooms and a gym hall, developer contribution funded.
3. Bilston PS Extension: Rising roll and catchment review requires
investment in school to address capacity and suitability. Limited
budget available.  Design team appointed to develop investment in
school that aligns with budget available from Developer
Contributions. Design is currently being market tested to ensure
project stays within the budget envelope, developer contribution
funded, Construction anticipated to start Jan 2026
4. Relocation of Mount Esk Nursery / Hawthornean Extension: Rising
roll and catchment review requires investment in school to address
capacity and suitability. Limited budget available.  Design team
appointed to develop investment in school that aligns with budget
available from Developer Contributions. Stage 2 design and costs
complete. Work ongoing 
Budget Risk Resource
A A A A
A R R A
A A A A
R R A A   
SRP.OP.09 Capital Projects – Children, Young People & Partnerships Estates Programme: Secondary 
Risk
Code Risk Identification Managed by Risk Commentary Risk Evaluation
SRP.O
P.09
Projects progressing, with Timeline,
Budget, Risk and Resource categorised
as parameters on a RAG status, with any
Red classifications identified and reported.  
Executive
Director *Place;
Executive
Director CYPP;
Head of
Development  
1. Beeslack HS Replacement: Site acquisition being progressed.
Planning consent now in place. Preferred contractor appointed
under two stage process. Cost reduction work due to start next 
2. Shawfair All Through: Site acquisition complete. School location
fixed with design team. Remediation programme underway by
Shawfair LLP. Shawfair All Through Campus budget approved at
Council. Project team appointments to forthcoming project board
3. Penicuik HS New Build: LEIP target for delivery is Dec 2026,
however programme for occupation is July 2027. Cost reports
tracking higher and risks identified in refurbishment works.  SFT 
Timeline Budget Risk Resource
R A A G
R A A A
A A A G
Page 132 of 134

Page 133

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
advising if additional LEIP funding available to address abnormal
costs. Contractor, Morrison Construction appointed Jan’25. Decant
works complete, advance works being planned  
SRP.OP.09 Capital Projects – Regeneration 
Risk
Code Risk Identification Managed by Risk Commentary Risk Evaluation
SRP.O
P.10
Projects progressing, with Timeline,
Budget, Risk and Resource categorised
as parameters on a RAG status, with any
Red classifications identified and reported.  
Executive
Director *Place;
Head of
Development  
1. Vogrie Changing Places:  Warrant submission now complete and
awaiting determination before install can go ahead. Part of wider
Vogrie Renewal Strategy. 
2. Destination Hillend: Alpine Coaster delivered with access and
parking infrastructure and Coaster now open. Project absorbed risk
and contingency.  Updated brief issued to SSM for high level site
planning and to brief Members in Q2.
3. Hopefield Industrial Estate: Updated financial model required. Cost
plan for upgrade to infrastructure being developed
4. Dalkeith Asset Rationalisation Programme: Decant of staff to
Fairfield House complete. Contractor appointed however project
now overbudget and being rescoped.  
Timeline Budget Risk Resource
R A R A
R R R A
R A A G
A R A G   
SRP.OP.04 City Deal 
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.O
P.04
South East Scotland Region City Deal - a
bid for funding to Scottish and UK
Governments to accelerate economic
growth through investment in
infrastructure/ housing/ skills and
innovation. 200 Council Houses linked to
the City Deal. 
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
1. Maintain strong Midlothian involvement through the City Deal
governance structure. 
2. Midlothian City Deal Key Officer (Internal) Group. 
3. Securing best arrangements for Midlothian through close liaison with
partners and conclusion of business cases.  
4 5 
Page 133 of 134

Page 134

STRATEGIC RISK PROFILE, Q2 Jul-Sept 2025 
Young People
and Partnerships                
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.O
P.04.02
Realisation of outcomes of respective
workstreams Q2 25/26: Work continues on the relevant programmes.  Executive Director
*Place 31-Mar-2026  10% 