Notice of Meeting and Agenda 
Audit Committee 
Venue:  Normandy Court/ Hybrid, 
Normandy Court, 20 Normandy Dr, Dalkeith, EH22 1JG 
Date:  Tuesday, 30 September 2025 
Time:  11:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone: 
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk 
Page 1 of 128

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item
and the nature of their interest. 
4          Minute of Previous Meeting
4.1 Minute of Audit Committee meeting of 16 June 2025 submitted for
approval
5 - 18
4.2 Action Log 19 - 20 
5          Public Reports
5.1 Audit Committee - Nomination of Chair, report by Chief Officer
Corporate
21 - 28
5.2 Annual Audit Report to Members and the Controller of Audit –
year ended 31 March 2025, report by Audit Scotland, External
Auditor – to follow 
5.3 Annual Accounts for the year ended 31 March 2025, report by
Chief Financial Officer & Section 95 Officer – to follow 
5.4 Internal Audit Work to September 2025, report by Chief Internal
Auditor
29 - 40
5.5 Audit Committee Annual / End of Term Report 2024/25, report by
Chair of the Audit Committee
41 - 60
5.6 Risk Management Policy and Strategy, report by Chief Officer
Place
61 - 86
5.7 Strategic Risk Management – Strategic Risk Profile Quarter 1,
2025-26, report by Chief Officer Place
87 - 128 
6          Private Reports 
No items for discussion 
Page 2 of 128

Page 3

7          Date of Next Meeting 
The next meeting will be held on Tuesday 2 December 2025 at 11am. 
Page 3 of 128

Page 4

Page 4 of 128

Page 5

Audit Committee        
Tuesday 30 September 2025
Item No 4.1 
Audit Committee 
Date Time Venue
Monday 16 June 2025 11am Council Chambers/Hybrid 
Present:
Councillor McEwan (Chair) Councillor Bowen
Councillor McCall Councillor Milligan (virtual)
Councillor Smaill   
In Attendance:
Councillor Alexander (virtual) Councillor McKenzie (virtual)
Dr Grace Vickers, Chief Executive  Kevin Anderson, Executive Director Place
Morag Barrow, Joint Director Health
and Social Care and Chief Officer to
Midlothian Integration Joint Board
(Virtual)
David Gladwin, Chief Financial
Officer/Section 95 Officer 
Saty Kaur, Chief Officer Corporate
Solutions
Derek Oliver, Chief Officer Place
Duncan Stainbank, Chief Internal
Auditor
Michelle Strong, Education Chief
Operating Officer
Alan Turpie, Legal and Governance
Manager and Monitoring Officer
Michelle Blair, Chief Internal Auditor, East
Renfrewshire Council
Patricia Fraser, Senior Audit Manager,
Audit Scotland
Claire Gardiner, Audit Director, Audit
Scotland
Gary Thomson, Senior Finance
Business Partner
Louise Middleton, Democratic Services
Officer 
Page 5 of 128

Page 6

Maria Perez, Democratic Services
Officer 
1. Welcome and Apologies for Absence 
The Chair welcomed everyone to the meeting of the Audit Committee. 
2. Order of Business 
The Legal and Governance Manager noted that the report for item 5.3 in the agenda
(Unaudited Annual Accounts 2024/25) was issued as a late paper on Thursday 12
June 2025 and asked the Chair that this was accepted in the order of business as a
matter of urgency. 
The Chair accepted that the paper is added to the order of business.
3. Declarations of interest 
No declarations of interest were intimated at this stage of the proceedings. 
4. Minute of Previous Meeting
Minutes of the previous meeting held 24 February 2025 were submitted for approval.
Councillor Smaill noted that they were unable to attend this meeting due to a diary
clash however they are listed as an attendee. The Chair asked that the minutes are
amended and asked the Committee whether they approve the minutes with the
amendment requested by Councillor Smaill as the correct record.  
Action - Democratic Services to review the list of attendees at 24 February 2025 Audit
Committee and correct where required.
Councillor McCall moved to approve the minutes, this was seconded by Councillor
Bowen.
The Chair pointed out the two items on the action log are marked for closure and asked
the Committee whether they approve with them being closed. Councillor McCall
moved to close both items and Councillor Bowen seconded the motion. 
Page 6 of 128

Page 7

5.      Public Reports 
Report No. Report Title Submitted by:
5.1
Midlothian Council Transformation: how
councils are redesigning and delivering
more efficient services to achieve planned 
outcomes
Audit Scotland
Outline of report and summary of discussion
The Audit Director, Audit Scotland presented the report for noting. 
This is the third report in the in Best Value Thematic Review series. This report is
due to be published in Audit’s Scotland annual report alongside the annual
accounts after they are signed by the External Auditors. 
The Audit Director highlighted key messages - Midlothian Council has developed a
clear transformation blueprint to address the £8.9 million budget gap and ensure
long term service sustainability by pursuing a wide number of initiatives. While Audit
Scotland is satisfied that there is effective governance oversight from the Business
Transformation Board and Business Transformation Steering Group, it has been
noted that the pace of the transformation should be accelerated to meet the
financial targets.   
The following examples of good practice were highlighted by auditors: 
• Workforce Development
• Strategic Alignment
• Digital transformation
• Community engagement 
It was also noted the transformation is aligned with the Medium-Term Financial
Strategy and Single Midlothian Plan. There is also evidence of strong collaboration
with National Health Service, Police Scotland and other agencies, for example in
projects such as the Number 11 Recovery Hub and Midlothian Energy Limited. 
The report also notes the good community engagement to date, and the
commitment to engage with service users. 
The Audit Director, Audit Scotland noted there are five recommendations in the
report, of which recommendations 2,4 and 5 are highlighted. These
recommendations are not identifying a gap, they are intended to encourage a
consistent approach. 
The first of those recommendations is to finalise the cost of projects and clearly
define savings, costs and benefits for priority transform projects, which is being
progressed by the Council. The final recommendation is the plan for the Project
Management Office sustainability, and this means developing a long-term
resourcing plan for transformation, beyond current plans to future proof the Council. 
The Chair thanked the Audit Director, Audit Scotland for their report and invited
questions. 
Page 7 of 128

Page 8

The Committee noted the report stresses income generating initiatives and asked
whether there was a conscious decision to exclude Hillend from this list. 
The Audit Director advised that this was a conscious decision, as it was only
possible to focus on one or two case studies due to budget constraints.  Audit
Scotland and External Auditors took advice from Midlothian Council on which case
studies would best exemplify transformation. 
Decision
The Audit Committee noted the contents of the report. 
Report No. Report Title Submitted by:
5.2 Annual Treasury Management Report
2024/25 Chief Financial
Officer/Section 95
Officer
Outline of report and summary ofiscussion
The Chief Financial Officer/Section 95 Officer presented the report for decision,
informing members of the Audit Committee of the Treasury Management activity
undertaken in 2024/25 and outlining the year-end position. 
The Audit Committee is invited to consider this report before the final report is
presented to Council. 
The main point highlighted is the loans fund rate of 2.73%, which has increased
from the previous year’s rate reflecting the higher cost of new borrowing. However,
Midlothian remains as the Local Authority with the lowest fund rate in Scotland.
There has also been £40 million worth of new long-term borrowing to meet cash
flow requirements, taking advantage of good rates which offset the cost. 
The approved Treasury Strategy is to refinance borrowing, when rates soften. The
Council were under borrowed by £90 million on 31 March 2025. £26 million pounds
are in instant access accounts, and the Council does not have any deposits with
other Local Authorities. 
The current forecasts suggest a gradual reduction of interest rates over the year.
There are sustained higher borrowing rates that pose a challenge to Council in
finance capital expenditure in the near term. The Finance Team will meet with
Treasury advisors to review strategy and submit any proposed amendments to
Elected Members for approval. 
The Chair thanked the Chief Financial Officer/ Section 95 Officer for their report
and opened for questions.   
The Committee praised the current strategy and queried whether the ability to
deposit up to £30 million with any bank part owned by the state is still under
consideration. The Senior Finance Business Partner advised that this is an area
that needs to be explored and reported on in the next financial year. 
Page 8 of 128

Page 9

Councillor McCall moved to approve the recommendations of the report, seconded
by Councillor Bowen.
Decision
The Audit Committee approved the recommendations set out in the report. 
Report No. Report Title Submitted by:
5.3 Unaudited Annual Accounts 2024/25
Chief Financial 
Officer/ Section 95 
Officer
Outline of report and summary of discussion
The Chief Financial Officer/Section 95 Officer presented the report for noting. It was
highlighted that once the unaudited accounts are considered by the Audit
Committee, they will be signed by the Chief Financial Officer/Section 95 Officer, to
then be published and submitted for inspection by the 30 June 2025. The audited
accounts will be presented to the Council in September 2025 for formal approval. 
It was noted that the accounts are a technical document, which may be complex
for many to grasp. There is also an expenditure and funding analysis on page 31
of the report, which summarises how annual expenditure is used and funded from
resources such as grants and Council Tax, and what resources have been
consumed. This is a bridge between the management accounts that are presented
on a quarterly basis. The report highlights movement in reserves since start of the
year. Detailed information on reserves will be presented to Council on 24 June
2025. 
The report includes a comprehensive income and expenditure statement in
accordance with international financial standards, as well as a balance sheet with
net assets and net equity. 
Other sections that were highlighted in the report are the management
commentary, which helps gain a better understanding of the accounts, the
statement of responsibilities detailing the role of the Section 95 Officer, and the
Annual Governance Statement which will be covered in item 5.10 of the agenda. 
The Chief Financial Officer/Section 95 Officer asked Audit Committee members to
note the implementation of International Finance Reporting Standards leases in
2024/25. This requires recognition of assets and liabilities for all leases where
previously many of these were treated as revenue expense. The figures in this
report are based on estimates and accounts may be adjusted before being
submitted to the auditor following final information received from colleagues last
week.   
The other matter of note is ongoing discussions over methodology to value Council
houses. The Chief Financial Officer/Section 95 Officer noted they are not yet
comfortable with the valuation system, and this will be reviewed with Audit Scotland
during the audit period. The account shows some areas of movement in housing
stock, and the value of long-term assets has increased by £30 million reflecting
Page 9 of 128

Page 10

investment in the asset base. The Lothian Bus account to 31 December 2024 also
shows an increase of assets of £9 million increasing the Council’s share to
£489,000. 
The pension asset value has increased by £87 million from a year ago, and
unfunded obligations have decreased to £6.4 million, which is seen as a liability.
The combined value of short-term investment and cash and cash equivalents at the
balance sheet date was £27 million, which is a reduction of £20 million from those
held on 31 March 2025. Long term liabilities have fallen by £2.4 million as Public
Private Partnership (PPP) and other contracts move towards expiry. 
As well as the Council’s accounts, the Finance Team is presenting group accounts
for Midlothian Integration Joint Board, Lothian Valuation Board and Midlothian
Energy Limited, Trusts Bequests, Common Goods and Community Funds, as
shown on page 87 of the accounts. 
The Chair thanked the Chief Financial Officer & Section 95 Officer for the report.
The Chair also thanked the Committee for accepting this report as a late paper and
invited questions. 
The Committee queried that states the Council employs 5,357 people, whether this
is FTE (Full Time Employment) places, and whether Midlothian House has been
considered in figures for impaired assets considering the future refurbishment. The
Chief Financial Officer/Section 95 Officer confirmed the employee figure is for
number of staff not FTE and for the impairment of the Midlothian House asset it
would be possible to look at the nature of the disclosure relating to the building and
be more transparent, if that is the wish of the Committee. 
The Committee also queried the value given for the Council’s house stock which is
£50,000 and whether this is too low. The Chief Financial Officer/Section 95 Officer
advised that the value given for Council Housing stock is a tried and tested method
that considers risk guidance and removes 68% to account for the discount factor.
The Chief Financial Officer/Section 95 Officer offered to provide additional sector
guidance if the Committee wish to look at this matter in depth. 
The Chair queried whether the Council houses are revalued when refurbishment
such as replacing doors, windows and kitchens takes place. The Chief Financial
Officer/Section 95 Officer confirmed that when capital expenditure in housing stock
is made, this is reflected in the gross value of the asset, as it enhances the nature
and life of the asset. The Audit Director, Audit Scotland confirmed that Audit
Scotland also looks at the discount factor as part of an audit, and while there is
some variation among Local Authorities in Scotland and England it tends to be
around 60%-70%. 
The Committee suggested that future reports include a glossary to explain
acronyms used in the report. The Chief Financial Officer/Section 95 Officer advised
that they will consider the use of acronyms in their future reporting. 
Page 10 of 128

Page 11

Decision
The Audit Committee noted the contents of the unaudited Annual Accounts
2024/25 
Report No. Report Title Submitted by:
5.4 Accounts Commission – Local
Government Budgets 2025/26
Chief Financial
Officer & Section 95
Officer
Outline of report and summary of discussion
The Chief Financial Officer & Section 95 Officer presented the report for
information. This report provides Audit Committee with a summary of the Local
Government Budgets 2025/26 report which was published by Audit Scotland in May
2025 and is appended to this report. The Chief Financial Officer & Section 95
Officer advised it is standard practice to bring documents of national interest to the
attention of the Audit Committee. 
The five main messages in the report are in connection with Scottish Government
funding, rising costs and the increasing demand on Councils to find local solutions
to budget gaps, transparency of the presentation of budget information and
community engagement as part of budget processes. The Committee will already
be familiar with the solutions found by Midlothian Council to these challenges, and
responses from other Local Authorities are provided for reference. 
The Chair thanked the Chief Financial Officer & Section 95 Officer for the report
and opened it up for questions. 
The Committee pointed out the numbers from Scottish Government and other Local
Authorities are not adjusted for inflation and wondered whether this had been taken
into consideration by the Convention of Scottish Local Authorities (COSLA) or
another body. The Chief Financial Officer/Section 95 Officer advised the Council
does not automatically increase those figures for inflation on an annual basis but
occasionally grants received from Government are increased, as was the case in
February 2025. 
Decision
The Audit Committee noted the recommendations in the report. 
Report No. Report Title Submitted by:
5.5  Internal Audit Work to May 2025  Chief Internal Auditor 
Outline of report and summary of discussion
The Chief Internal Auditor presented the report for decision, providing members of
the Audit Committee with details of the recent work carried out by Internal Audit, the
Page 11 of 128

Page 12

findings and recommended audit actions agreed by Management to improve internal
controls and governance arrangements. 
The Audit Committee is recommended to:
(a) Consider the Executive Summary of the final Internal Audit Assurance Report
issued associated with the delivery of the approved Internal Audit Annual Plan
2024/25;
(b) Note the Internal Audit Consultancy and Other Work carried out in accordance
with the approved Internal Audit Charter; and
(c) Acknowledge the assurance provided on internal controls and governance
arrangements in place for the areas covered by this Internal Audit work. 
An Executive Summary of the final Internal Audit Assurance Report issued, including
audit objective, findings, good practice and recommendations (where appropriate),
and the Chief Internal Auditor’s independent and objective opinion on the adequacy
of the control environment and governance arrangements within each audit area is
shown in Appendix 1. 
The Chief Internal Auditor highlighted a number of internal reports, noting there is
an executive summary in the following pages of the report: 
• SEEMiS (Scottish Education Establishments Management Information
System) providing reasonable assurance (summary in page 121 of report)
• IT Asset Management providing limited assurance (page 132)
• Education Construction Governance providing reasonable assurance (page
127)
• Revenue Financial Budget providing reasonable assurance (page 139) 
SEEMiS  is a system used by all Scottish Councils. The view is that SEEMiS is
generally secure but there was a concern identified in connection with former staff
members still having access. As a result of this audit system access control is to be
adjusted. 
The key findings of the IT Asset Management Audit note a lack of process for
reconciling assets with purchase orders and no payments made to the asset
management disposal contractor management. Several recommendations were
made to service managers for implementation. 
The Chief Internal Auditor added that there were material variances in the budget
monitoring for Adult Health and Social Care Services.  Budget monitoring processes
report material variances in Adult Social Care Services. These are not currently
included within the Council reports but they are regularly reported to the Midlotian
Integrated Joint Board. As of the 2025-2026 financial year these will be part of the
Council Internal Audit Work 
The Chair thanked the Chief Internal Auditor for their report and opened for
questions.   
The Committee noted the report highlights some deficiencies in Council Tax control
and Council Tax refund monitoring of refunds. Considering the recent fraud
uncovered at Aberdeen City Council the Committee asked when Internal Audit last
Page 12 of 128

Page 13

conducted a review of Council Tax.  The Chief Internal Auditor explained that the
matter of Council Tax will be covered in item 5.6 but advised that the findings in
relation to Council Tax refunds suggest that procedural control is strong, however
the system control for segregation of duties was not robust enough, and that has
now been addressed following input from Internal Audit. 
The Chair noted that the headlines on page 141 state that the conclusion for
Objective 4 - Revenue Budget Monitoring Reporting for Elected Member; and senior
management level is adequate shows as “Limited” and asked for clarification on
whether this means limited assurance or limited access to information. The Chief
Internal Auditor referred to page 116 of the meeting papers which provides the
definition for each category.  The Chief Internal Auditor confirmed that there is
limited assurance in connection with Revenue Budget Monitoring, that improvement
is required, and monitoring is reviewed on a quarterly basis. 
Decision
The Audit Committee approved the recommendations set out in the report. 
Report No. Report Title Submitted by:
5.6 Council Tax Refunds Control
Assurance Review
Chief Internal
Auditor
Outline of report and summary of discussion
The Chief Internal Auditor presented the report for information. 
Following receipt of a letter from the Chair of the Accounts Commission the Chief
Executive of Midlothian Council requested that Internal Audit review the areas
indicated in the letter against the processes for payment of Council Tax refunds in
Midlothian Council. The letter was sent to all Scottish Local Authority Chief
Executives on the 10 January 2025 and is included as appendix to the report. As
noted in previous items this Internal Audit was requested following uncovering of
evidence of significant Council Tax fraud in Aberdeen City Council. 
The Internal Audit was completed in June 2025 and concludes that the Council has
good procedural controls in place, however there is evidence that compliance with
these controls is not always being monitored and is not supported by appropriate
systems controls for segregation of duties. Subsequent sample testing identified no
evidence of fraud within the 2024/25 financial year. The Chief Internal Auditor
advised the main recommendation was to refresh counter fraud policies. 
The Chair thanked the Chief Internal Auditor for their report and opened for
questions.   
There were no questions presented by the Committee, and the recommendations
in the report were noted. 
Decision
The Audit Committee noted the contents of the report. 
Page 13 of 128

Page 14

Report No. Report Title Submitted by:
5.7 Internal Audit Assurance Report
2024/25 Chief Internal
Auditor
Outline of report and summary of discussion
The Chief Internal Auditor presented the report for decision. 
The report presents Audit Committee with the Internal Audit Annual Assurance
Report for the year to 31 March 2025 which includes the Chief Internal Auditor’s
independent assurance opinion on the adequacy of Midlothian Council's overall
control environment.   
The Public Sector Internal Audit Standards (PSIAS) require that the Chief Audit
Executive, the Council’s Chief Internal Auditor, provides an annual Internal Audit
opinion and report on the adequacy and effectiveness of the Council’s governance,
risk management and internal controls to support the preparation of the Annual
Governance Statement. This is in support of the overall governance arrangements
of the Council, as set out in the Local Code of Corporate Governance. To meet the
requirements of the PSIAS, the Internal Audit Annual Assurance Report 2024/25
(Appendix 1) includes the Chief Internal Auditor’s annual opinion on page 184,
which provides details of the Internal Audit activity and the performance during the
year to fulfil its role, and summarises the outcomes of assessments of the Internal
Audit service against the PSIAS. 
The Chief Internal Auditor advised their report states the systems of internal control
and risk management, and governance are generally adequate. Improvements are
required for the internal control environment in relation to business continuity,
service risk management, IT asset management, assets management and revenue
financial monitoring, procurement and contract management, all of which need to
be completed against the challenging financial environment. 
Finally report section 4.3 notes the recommendations the Internal Audit team need
to take forward as the result of the external quality assessment which is in section
5. 
The Chair thanked the Chief Internal Auditor for their report and opened for
questions.   
There were no questions. The report was moved by Councillor McCall and
seconded by Councillor Bowen 
Decision
The Audit Committee approved the recommendations set out in the report. 
Page 14 of 128

Page 15

Report No. Report Title Submitted by:
5.8 Counter Fraud Annual Report 2024/25 Chief Internal
Auditor
Outline of report and summary of discussion
The Chief Internal Auditor presented the report for decision, making the Audit 
Committee aware of the Council’s counter fraud responsibilities, the activities of the
Integrity Group and Corporate Fraud Team in liaison with other services
over the past year as part of the arrangements to tackling fraud at the Council. 
Having robust fraud prevention and investigation arrangements in place contributes
to safeguarding the Council’s resources for delivery of services, as part of
protecting the public purse. The Counter Fraud Strategy approved by the Council
on 25 August 2020 includes: a focus on enhancing fraud prevention and detection
to improve Midlothian Council’s resilience to the risk of fraud, theft, corruption and
crime; and ensure these are embedded preventative practices. Assurances about
the effectiveness of the Council’s existing systems and arrangements for tackling
fraud can be taken from the outcomes contained within this report. 
The Chief Internal Auditor highlighted that as part of the Fraud Team’s work with
other teams and following Audit Scotland’s advice, savings of £906,713 pounds
have been made during 2024-25.  The savings are detailed in appendix 1. The
figure reported as part of internal corporate fraud recovery is £45,413. The savings
accrued from properties where official tenants were residing elsewhere amount to
£861,300 and furthermore this has meant that the 11 properties vacated have
allowed Housing Services to offer homes to 11 families on the waiting list. 
Appendix 2 highlights remaining savings obtained through matches in the National
Fraud Initiative exercise 2022-23. For the cases involving Single Person Council
Tax Discount, these are considered through the Council Tax Reduction Scheme,
while the other ones are based on assessments from the National Fraud Initiative. 
The Chair thanked the Chief Internal Auditor for their report and expressed
congratulations to the Housing Team’s work in identifying instances of fraud. The
Chair opened the report for questions.   
The Committee queried whether fraud related to disability Blue Badges falls within
the scope of the National Fraud Initiative. The Chief Internal Auditor advised a
series of matches through the National Fraud Initiative exercise came from the
Department of Work and Pensions. A large majority of these were cases where a
Blue Badge was taken off fraudulent claimants who were using them after the
original recipient moved out of the area or passed away. The Committee asked
whether Midlothian Council has a whistleblowing facility to allow residents to report
fraud concerns to the Council. The Chief Internal Auditor advised there is a
whistleblowing phoneline and a functionality on the Council’s website to report
anonymously and non-anonymously.  Midlothian Council encourages anyone with
concerns to report them to the Fraud Team. 
The report was moved by Councillor McCall and seconded by Councillor Bowen. 
Page 15 of 128

Page 16

Decision
The Audit Committee approved the recommendations set out in the report.
Report No. Report Title Submitted by:
5.9 External Quality Assessment of
Midlothian Council’s Internal Audit
Service
Chief Internal
Auditor
Outline of report and summary of discussion
The Chief Internal Auditor presented the report for information, introducing the 
External Quality Assessment of Midlothian Council’s Internal Audit Service recently
completed by Michelle Blair, Chief Auditor East Renfrewshire Council. The report
is included as Appendix 1.
The Audit Committee is asked to note the External Quality Assessment of
Midlothian Council’s Internal Audit Service recently completed by Michelle Blair,
Chief Internal Auditor, East Renfrewshire Council. This is a requirement which
Local Authorities should complete every 5 years; however, this has been delayed
by two years due to the COVID pandemic and further challenges related to shared
service implementation.  
The Chief Internal Auditor of East Renfrewshire Council advised that this is the last
report completed under the PSIAS arrangement as it was replaced by the Global
Internal Audit Standards (GIAS) in April 2025 which provides the same level of
compliance.
The Audit covers 14 separate areas, of which Midlothian was shown as conforming
in 8 areas, and generally conforming in the remaining 6 areas. 
The overall conclusions are on page 210 and the summary bullet points suggest
areas for improvement.
The Chief Internal Auditor of East Renfrewshire Council noted the Internal Audit
Team is very qualified, high performing, and has a significant level of compliance
across all areas considered and thanked the stakeholders for their cooperation.
The Chair thanked the Chief Internal Auditor for their report and opened for
questions.  
As there were no questions the Audit Committee noted the contents of the report.
Decision
The Audit Committee noted the contents of the report.
Page 16 of 128

Page 17

Report No. Report Title Submitted by:
5.10 Draft Annual Governance Statement
2024/25 Chief Executive
Outline of report and summary of discussion
The Chief Executive presented the report for decision, proposing that the Audit
Committee considers and approves the draft Annual Governance Statement that 
will be published in the Council’s Statement of Accounts 2024/25. 
Section 4 in the report outlines the assurance process followed, while appendix 1
contains the assurance statement. 
Five areas for improvement were identified in the report, namely:
• Financial sustainability
• Procurement capacity
• Capital plan affordability
• Need to update service level risk registers and business continuity plans
• Need to update Council Tax refund monitoring processes, which is currently
in the process of being addressed with the system supplier.
The improvements recommended are in page 239-240 of the meeting papers.
Section 4.6 of the report is the Chief Executive’s statement which provides
adequate assurance on matters of control, governance and assurance that the local
code is being complied. There are also adequate internal control systems in place.
This report has two recommendations:
• Consider the details of the Draft Annual Governance Statement
• Approve the report’s publication as part of the Council’s statement of
accounts.
The Chair thanked the Chief Executive for the report and opened for questions.
The Committee asked whether Midlothian Council were invited to make a statement
regarding Midlothian Integration Joint Board governance given the limited control.
The Chief Executive advised this was out with the scope of the report, but effort will
be made to improve the Council’s ability to report on the Midlothian Integration Joint
Board’s finances and include information on their governance in reports going
forward.
The Audit Committee agreed to both recommendations. The report was moved by
Councillor McCall and seconded by Councillor Bowen.
Decision
The Audit Committee approved the recommendations set out in the report and to
its publication.
Page 17 of 128

Page 18

Report No. Report Title Submitted by:
5.11 Strategic Risk Profile Quarter 4, 2024-25 Chief Officer Place
Outline of report and summary of discussion
The Chief Officer Place presented the report for information, providing Audit
Committee with an update on the risk landscape and the Council’s organisational
response including the most significant risks of quarter 4 of the financial year 2024-
2025 (1st Jan to 31st March 2025). Council is asked to note the contents of the
report.
Audit Committee is recommended to note there are no new risks in the Risk
Register but there are new mitigating actions to mitigate the existing risks in the
register.
Key aspects of Quarter 4 are mitigating strategies for climate change as work has
commenced on a new Climate Change Strategy following the Council approving a
new target to achieve net zero by 2045. 
A new Economic Strategy for Inclusive Growth has stimulated work on delivery
plans which will be presented to June council. 
Council also approved the Workforce Strategy and received an update on Capital
Plan Prioritisation in February 2025. 
The Chair thanked the Chief Officer Place for their report and opened for questions.
Elected Members thanked the Chief Officer Place for the report and asked how the
Strategic Risk Profile can respond to unknowns and unlikely scenarios such as
restrictions on water usage resulting from the dry weather in May 2025.  
The Chief Officer Place advised that in terms of risk management, several factors
are considered to plan mitigating actions. When faced with unique and
unprecedented events such as the COVID pandemic, there are no plans despite a
clear need to respond timeously. The consequences of dry weather on water
management are covered under climate response to ensure the Council can
respond to the needs of communities.
Decision
The Audit Committee noted the contents of the report.
6. Private Reports
No items for discussion.
7. Date of Next Meeting
The meeting concluded at 11.58 am.
The next meeting of the Audit Committee will be held on Tuesday 30 September 2025
at 11:00am.
Page 18 of 128

Page 19

Audit Committee
Tuesday 30 September 2025
Item 4.2
Audit Committee Action Log
No Date of Meeting Item No and
Title
Action Action Owner Expected
completion date
Comments
1 16 June 2025 4.1 Minute of
Audit
Committee
Meeting of 24
February 2025
Review the list of attendees
at 24 February 2025 Audit
Committee as detailed on
the minute, and correct
where required.
Democratic
Services
30 September
2025
Recommended for
closure.
The webcast of 24
February 2025 Audit
Committee Meeting was
reviewed and the attendees
listed on the minute of the
meeting, which was
included in the agenda
pack for 16 June 2025 for
approval, was verified as
the correct record.
Page 19 of 128

Page 20

Page 20 of 128

Page 21

Audit Committee
Tuesday 30 September 2025
Item No 5.1
Audit Committee – Nomination of Chair
Report by Saty Kaur, Chief Officer Corporate Solutions
Report for Decision
1 Recommendations
Audit Committee is recommended to:
 Nominate an Elected Member from the Audit Committee to the
role of Chair.
2 Purpose of Report/Executive Summary
The purpose of this report is to seek nomination for an Elected
Member from the Audit Committee to the role of Chair.
Date Wednesday 17 September 2025
Report Contact:
Saty Kaur, Chief Officer Corporate Solutions
Saty.Kaur@midlothian.gov.uk
Page 21 of 128

Page 22

3 Background/Main Body of Report
3.1 The Audit Committee comprises 5 Elected Members. 
Councillor Douglas Bowen
Councillor Debbi McCall
Councillor Willie McEwan
Councillor Derek Milligan
Councillor Peter Smaill
3.2 In 2022, the Audit Committee agreed an annual rolling programme of
Chair, until September 2025.  Audit Committee are now asked to
consider the appointment of Chair until the Local Government Elections
in May 2027.
3.3 The Committee remit includes:
Statement of purpose 
1. The Audit Committee is a key component of Midlothian Council’s
corporate governance. It provides an independent and high-level focus
on the audit, assurance and reporting arrangements that underpin good
governance and financial standards.
2. The purpose of the Audit Committee is to provide independent
assurance to elected members of the adequacy of the risk
management framework and the internal control environment. It
provides independent review of Midlothian Council’s governance, risk
management and control frameworks and overseas the financial
reporting and annual governance processes. It oversees internal and
external audit, helping to ensure efficient and effective assurance
arrangements are in place.
Governance, risk and control 
3. To review the Council’s corporate governance arrangements against
the good governance framework and consider annual governance
reports and assurances, relating to the Council’s service delivery
models including partnership and collaboration, to ensure that the
highest standards of probity, public accountability and ethical standards
are demonstrated.
4. To review the Annual Governance Statement prior to approval and
consider whether it properly reflects the risk environment and
supporting assurances, taking into account Internal Audit’s opinion on
the overall adequacy and effectiveness of the Council’s framework of
governance, risk management and control. 
5. To consider the Council’s arrangements to secure value for money and
review assurances and assessments on the effectiveness of these
arrangements. 
6. To consider the Council’s framework of assurance, relating to the
Council’s service delivery models including partnership and
Page 22 of 128

Page 23

collaboration, and ensure that it adequately addresses the risk and
priorities of the Council. 
7. To monitor the effective development and operation of risk
management in the council relating to the Council’s service delivery
models including partnership and collaboration. 
8. To monitor progress in addressing risk-related issues reported to the
committee. 
9. To consider reports on the effectiveness of internal controls and
monitor the implementation of agreed actions. 
10.To review the assessment of fraud risks and potential harm to the
council from fraud corruption. 
11.To monitor the counter-fraud strategy, actions and resources. 
12.To monitor controls operating over Treasury Management, through the
scrutiny of the Treasury Management Strategy, mid-term and annual
performance reports prior to their presentation to Council for approval,
and the Council’s approach to establishing ethical standards.
Internal audit 
13.To approve the Internal Audit Charter. 
14.To review proposals made in relation to the appointment of external
providers of Internal Audit services and to make recommendations. 
15.To approve the risk-based internal audit plan, including internal audit’s
resources requirements, the approach to using other sources of
assurance and any work required to place reliance upon those other
sources. 
16.To approve significant interim changes to the risk-based internal audit
plan and resource requirements. 
17.To make appropriate enquiries of both management and the Chief
Internal Auditor to determine if there are any inappropriate scope or
resource limitation.
18.To consider reports from the Chief Internal Auditor on Internal Audit’s
performance during the year, including the performance of external
providers of Internal Audit services. These will include:
a. Updates on the work of Internal Audit including key findings, issues
of concern and action in hand as a result of internal audit work.
b. Regular reports on the results of the Quality Assurance and
Improvement Programme.
c. Reports on instances where the internal audit function does not
conform to the Public Sector Internal Audit Standards and Local
Government Application Note, considering whether the non-
Page 23 of 128

Page 24

conformance is significant enough that it must be included in the
Annual Governance Statement.
19.To consider the Chief Internal Auditor’s annual report:
d. The statement of the level of conformance with the Public Sector
Internal Audit Standards and Local Government Application Note
(including code of ethics) and the results of Assurance and
Improvement Programme that supports the statement – these will
indicate the reliability of the conclusions of internal audit.
e. The opinion on the overall adequacy and effectiveness of the
Council’s framework of governance, risk management and control
together with the summary of the work supporting the opinion -
these will assist the committee in reviewing the Annual Governance
Statement.
20.To consider summaries of specific Internal Audit reports as requested.
21.To receive reports outlining the action taken where the Chief Internal
Auditor has concluded that management has accepted a level of risk
that may be unacceptable to the authority or there are concerns about
progress with the implementation of agreed actions.
22.To contribute to the Quality Assurance and Improvement Programme
and in particular, to the external quality assessment of Internal Audit
that takes place at least once every five years.
23.To consider a report on the effectiveness of Internal Audit to support
the Annual Governance Statement.
24.To support the development of effective communication with the Chief
Internal Auditor.
External audit
25.To consider the external auditor’s annual letter, relevant reports, and
the report to those charged with governance.
26.To consider specific reports as agreed with the external auditor.
27.To comment on the scope and depth of external audit work and to
ensure it gives value for money.
28.To commission work from internal and external audit. 
29.To advise and recommend on the effectiveness of relationships
between external and internal audit and other inspection agencies or
relevant bodies.
Financial Reporting 
30.To review the annual statement of accounts. Specifically, to consider
whether appropriate accounting policies have been followed and
Page 24 of 128

Page 25

whether there are concerns arising from the financial statements or
from the audit that need to be brought to the attention of the Council.
31.To consider the external auditor’s report to those charged with
governance on issues arising from the audit of the accounts.
Accountability arrangements 
32.To report to those charged with governance on the committee’s
findings, conclusions and recommendations concerning the adequacy
and effectiveness of their governance, risk management and internal
control frameworks; financial reporting arrangements, and internal and
external audit functions.
33.To report to full Council on a regular basis on the committee’s
performance in relation to the terms of reference and the effectiveness
of the committee in meeting its purpose.
Meetings
The Council will decide on the schedule of meetings for the Audit
Committee, usually on a rolling annual basis which will be published.
Quorum
The quorum for meetings of the Audit Committee will be 3 Members,
which may include the Independent Chair (when appointed).
Minutes
The Minutes of the Audit Committee will be recorded by the Officer
clerking the meeting and submitted to the next ordinary meeting of the
Committee for approval. They will also be submitted to the Council both
for information and to allow the Council to consider any
recommendations contained in them. Meetings of the Audit Committee
will also be audio cast subject to the exemptions contained within the
Local Government (Scotland) Act 1973.
Private items of any meeting agenda will be recorded and the recording
retained by Democratic Services which will be accessible to all Elected
Members and relevant Officers for 12 months from the date of the
meeting.
Page 25 of 128

Page 26

4 Report Implications (Resource, Digital and Risk)
4.1 Resource
No implications
4.2 Digital
No implications
4.3 Risk
Failure to nominate a member means the Council is not following its
Standing Orders and Scheme of Administration.
4.4 Ensuring Equalities (if required a separate IIA must be completed)
No implications
4.4 Additional Report Implications (See Appendix A)
See Appendix A
Page 26 of 128

Page 27

APPENDIX A – Report Implications
A.1 Key Priorities within the Single Midlothian Plan
N/A
A.2 Key Drivers for Change
Key drivers addressed in this report:
Holistic Working
Hub and Spoke
Modern 
Sustainable 
Transformational
Preventative
Asset-based
Continuous Improvement
One size fits one
None of the above
A.3 Key Delivery Streams
Key delivery streams addressed in this report:
One Council Working with you, for you
Preventative and Sustainable
Efficient and Modern 
Innovative and Ambitious 
None of the above
A.4 Delivering Best Value
N/A
A.5 Involving Communities and Other Stakeholders
N/A
A.6 Impact on Performance and Outcomes
N/A
A.7 Adopting a Preventative Approach
N/A
A.8 Supporting Sustainable Development
N/A
Page 27 of 128

Page 28

Page 28 of 128

Page 29

Audit Committee
Tuesday 30 September 2025
Item No 5.4
Internal Audit Work to September 2025
Report by Chief Internal Auditor
Report for Decision
1 Recommendations
The Audit Committee is asked to:
a) Consider the Executive Summary of the final Internal Audit assurance report issued
associated with the delivery of the approved Internal Audit Annual Plan 2025/26;
b) Note the Internal Audit Consultancy and Other Work carried out in accordance with the
approved Internal audit Charter; and
c) Acknowledge the assurance provided on internal controls and governance arrangements
in place for the areas covered by this Internal Audit work.
2 Purpose of Report/Executive Summary
The purpose of this report is to provide members of the Audit Committee with details of the
recent work carried out by Internal Audit and the findings and recommended audit actions
agreed by Management to improve internal controls and governance arrangements.
The Internal Audit Annual Plan 2025/26 was approved by the Audit Committee on 24
February 2025. Internal Audit has carried out work associated with the delivery of the plan to
meet its objective of providing an opinion on the efficacy of the Council’s risk management,
internal control and governance.
An Executive Summary of the final Internal Audit assurance report issued, including audit
objective, findings, good practice and recommendations (where appropriate), and the Chief
Internal Auditor’s independent and objective opinion on the adequacy of the control
environment and governance arrangements within each audit area is shown in Appendix 1.
The Internal Audit function conforms to the professional standards as set out in Global
Internal Audit Standards (GIAS) including the production of this report to communicate the
results of the reviews.
Date 16 September 2025
Report Contact:
Duncan Stainbank
duncan.stainbank@midlothian.gov.uk
Page 29 of 128

Page 30

2
3 Progress Report
3.1 The Internal Audit Annual Plan 2025/26 was approved by the Audit Committee on 24
February 2025. Internal Audit has completed the following work in the period from 31 May
2025 to 17 September 2025 associated with the delivery of the plan to meet its objective of
providing an opinion on the efficacy of the Council’s risk management, internal control and
governance.
3.2 The Internal Audit function conforms to the professional standards as set out in Global
Internal Audit Standards (GIAS), including the production of this report to communicate the
results.
3.3 Internal Audit issued a final assurance report on the following subjects:
• Recruitment and Use of Agencies.
3.4 An Executive Summary of the final Internal Audit assurance report issued including audit
objective conclusions, key findings, recommendations, areas of good practice, the Chief
Internal Auditor’s independent and objective opinion on the adequacy of the control
environment and governance arrangements within each audit area is shown in Appendix 1.
3.5 The definitions for Internal Audit assurance categories are as follows:
Level Definition
Substantial
Assurance
A sound system of governance, risk management and control exists, with internal controls
operating effectively and being consistently applied to support the achievement of objectives in
the area audited.
Reasonable
Assurance
There is a generally sound system of governance, risk management and control in place. Some
issues, non-compliance or scope for improvement were identified which may put at risk the
achievement of objectives in the area audited.
Limited
Assurance
Significant gaps, weaknesses or non-compliance were identified. Improvement is required to the
system of governance, risk management and control to effectively manage risks to the
achievement of objectives in the area audited.
No Assurance Immediate action is required to address fundamental gaps, weaknesses or non-compliance
identified. The system of governance, risk management and control is inadequate to effectively
manage risks to the achievement of objectives in the area audited.
Internal Audit Consultancy and Other Work
3.6 Internal Audit staff have been involved in the following for the Council to meet its aims and
objectives, and its roles and responsibilities in accordance with the approved Internal Audit
Charter and Strategy:
a) In its critical friend role provided an independent view and challenge at various forums
including: Capital Plan and Asset Management Board, Chief Officers Risk & Resilience
Group, and the Integrity Group.
b) Learning and development during the research stage of new audit areas for all Internal
Audit team members and through joining audit forums (Computer Audit Sub-group) and
meetings; and
c) Monitored publication of Audit Scotland reports.
Page 30 of 128

Page 31

3
Recommendations
3.7 Recommendations in reports are suggested changes to existing procedures or processes to
improve the controls or to introduce controls where none exist. The grading of each
recommendation reflects the risk assessment of non-implementation, being the product of the
likelihood of the risk materialising and its impact:
High Recommendations relating to factors fundamental to the success of the control objectives of the
system. The weaknesses may give rise to significant financial loss/misstatement or failure of
business processes.
Medium Recommendations which will improve the efficiency and effectiveness of the existing controls.
Low Recommendations concerning minor issues that are not critical, but which may prevent attainment
of best practice and/or operational efficiency.
Outwith the report, Internal Audit informs operational managers about other matters as part of continuous
improvement.
3.8 The table below summarises the number of Internal Audit recommendations made during
2025/26:
Recs Rating 2025/26 Number of Recs
High 0
Medium 9
Low 13
Not Graded 0
Sub-total reported this period 22
Previously reported 0
Total 22
Recommendations agreed with action plan 22
Not agreed; risk accepted 0
Total 22
4 Report Implications (Resource, Digital, Risk and Equalities)
4.1 Resource
Resource implications of implementing Internal Audit recommendations are considered as
part of the audit process to ensure these are reasonable and proportionate to the risks.
4.2 Digital
There are no digital implications arising from this report.
Page 31 of 128

Page 32

4
4.3 Risk
The GIAS require Internal Audit to evaluate the effectiveness of the Council’s Risk
Management arrangements and contribute to improvements in the process. At the start of
each audit engagement, to capture potential areas of risk and uncertainty more fully, key
stakeholders have been consulted and risk registers have been considered. During each
audit engagement the management of risk has been tested.
It is anticipated that improvements in the management and mitigation of risks will arise as a
direct result of Management implementing the Internal Audit recommendations made. If audit
recommendations are not implemented, there is a greater risk of financial loss and/or
reduced operational efficiency and effectiveness, and Management may not be able to
demonstrate improvement in internal control and governance arrangements, and effective
management of risks.
4.4 Ensuring Equalities
This report does not relate to a new or revised policy, service or budget change, which
affects people (the public or staff), so an Integrated Impact Assessment (IIA) is not an
applicable consideration.
The Internal Audit work is carried out in accordance with the appropriate legislation and
professional standards. The latter includes compliance by those within the Internal Audit
function with the ethical requirements set out in the GIAS which is appropriate for the
profession of Internal Audit founded as it is on trust placed in its independent and objective
assurance about risk management, internal control and governance.
4.5 Additional Report Implications (See Appendix A)
Page 32 of 128

Page 33

5
APPENDIX A – Additional Report Implications
A.1 Key Priorities within the Single Midlothian Plan
Although this report does not relate directly to the key priorities within the Single Midlothian
Plan to which Midlothian Council and its Community Planning Partners have made a
commitment (Reducing the gap in economic circumstances; Reducing the gap in learning
outcomes; Reducing the gap in health outcomes; and Reducing the impact of climate
change), good governance is important to enable Midlothian Council to deliver its key
priorities in support of achieving the Council’s objectives.
A.2 Key Drivers for Change
Key drivers addressed in this report:
Holistic Working
Hub and Spoke
Modern
Sustainable
Transformational
Preventative
Asset-based
Continuous Improvement
One size fits one
None of the above
Midlothian Council is committed to creating a great place to grow supported by the 9 drivers
for change. Implementing the 9 drivers for change in practice is applicable to the Council’s
Internal Audit service provision to assist the Council in achieving its objectives.
A.3 Key Delivery Streams
Key delivery streams addressed in this report:
One Council Working with you, for you
Preventative and Sustainable
Efficient and Modern
Innovative and Ambitious
A.4 Delivering Best Value
Implementation by Management of the actions associated with Internal Audit
recommendations, that are designed to improve internal control and governance
arrangements and management of risks, underpins the Council’s own continuous
improvement arrangements to enhance its effectiveness, thus supporting the delivery of the
Council’s best value duties.
A.5 Involving Communities and Other Stakeholders
The Chief Internal Auditor is accountable to the Audit Committee which, in fulfilling its
governance role, acts as a bridge between the Council and other stakeholders.
Page 33 of 128

Page 34

6
This report has been presented to Senior Management relevant to the areas audited and
have agreed the final Internal Audit assurance reports as set out in the relevant Executive
Summary within Appendix 1.
A.6 Impact on Performance and Outcomes
The Findings and Recommendations from Internal Audit work during the year are designed to
assist the Council in improving its performance and outcomes.
A.7 Adopting a Preventative Approach
Internal Audit assurance work includes assessments on when a preventative approach can
be adopted.
A.8 Supporting Sustainable Development
This report does not relate directly to supporting sustainable development. Good governance
is important to enable Midlothian Council to achieve its objectives.
Page 34 of 128

Page 35

Appendix 1.  Executive Summary: Recruitment & Use of Agencies
Conclusion: Limited Assurance
Policies and procedures have been established to support the recruitment process and the Council’s use of agencies.  Digital workflows have
been developed to support the recruitment authorisation and onboarding processes and systems are in place to support managers with the
selection and shortlisting process.  However, it was identified that there is high usage of agency suppliers that are not on any Council approved
public sector framework, a lack of ongoing review by DMT of agency workers, inaccuracies of the off-payroll establishment in iTrent, an agency
worker policy that does not operate as described, the audit trail between the digital workflow for post authorisation and the staffing authorisation
spreadsheet taken to DMT for approval is weak and inadequate monitoring arrangements for the application of the Recruitment and Selection
Policy and the Policy on the Use of Agency Workers.
Background
The purpose of the audit was to review the processes in place to ensure that recruitment is completed effectively and protects the Council from
the risk of employment of inappropriate or unqualified employees or agency workers, whilst meeting legislative requirements.  Employment and
Reward (E&R) manage the design, delivery, and operation of recruitment, operate payroll processes ensuring compliance with relevant
regulatory, statutory and legislative provisions, and are responsible for the interpretation and implementation of legislation and regulation in
relation to PAYE and other statutory requirements.  The team work closely with the Human Resources (HR) team to ensure the appropriateness
and effective implementation of a range of People Policies and procedures.  System support is provided by the Business Applications Team.  The
iTrent HR & Payroll System is used for the Council’s payroll, absence management, and HR functions and the Talentlink system (provided by
COSLA) is used to support the application and shortlisting process.  Personnel documentation is held in Opentext CS23 and digital workflows
have been developed to support the recruitment process using this application.    
Summary of key findings and recommendations
The following findings and recommendations are highlighted, which have all been agreed by Management:
 Approximately £3million (38%) per annum of agency spend across a number of services are with suppliers who are not on any approved
public sector framework.  Management will liaise with the Procurement Team and over time substantially reduce the level of non-framework
agency suppliers used by 30 September 2026.
 The off-payroll establishment in iTrent includes 79 off-payroll workers who have left the Council and 17 agency workers who are currently
working with the Council but have not been added to the iTrent system.  Management will review and update the iTrent off-payroll
establishment and review why the agency workers identified have not been added to iTrent by 31 December 2025.
 The audit trail between the digital workflow for post authorisation and the staffing authorisation spreadsheet taken to DMT for approval is
weak.  Management will review and strengthen the arrangements for this by 31 October 2025 and the iTrent upgrade (if agreed subject to
funding) has intentions to review existing and improve processes around control of posts and positions aligned to budget monitoring by 30
September 2026.
 The list of agency workers for each directorate is not formally presented to DMTs for ongoing authorisation as required by the current policy.
The directorate listing of all agency staff should periodically be presented to relevant DMTs for review in line with the policy by 31 December
2025.
 Clear written principles have not been established for managers to follow on when a level 1 disclosure check is required.  Guidance will be
prepared that details principles for all managers to follow on when a basic level 1 disclosure check is required by 31 March 2026. 
Page 35 of 128

Page 36

2
 The processes and controls detailed in the Policy on the Use of Agency Workers are not operating as described.  The Recruitment and
Selection Policy has not been updated since 2012 and is out-of-date in a number of respects including how the policy is monitored,
legislation, best practice, and the Council’s organisational structure.  Management are in the process of reviewing the Recruitment and
Selection Policy and will present a revised policy for Trade Union consultation and formal approval by 31 December 2025.
Recommendations
Grade
High Medium Low Total
Current Report - 9 13 22
Prior Report - N/A - - - -
Materiality -
The Council’s annual payroll expenditure including employer’s national
insurance and employer’s pension contributions was £203,133,207 in
2024/25 and £199,303,547 in 2023/24.
The Council’s agency spend was £7,818,199 in 2024/25 and £8,006,288 in
2023/24.
Page 36 of 128

Page 37

3
Headlines
Objectives Conclusion Comments
1.  Recruitment and Agency
Worker policies and
procedures are in place and
training is provided /
monitoring undertaken to
ensure these are complied
with.
Limited
Assurance
A Recruitment and Selection Policy is in place; however, the policy has not been updated since 2012
and is out-of-date in a number of respects including references to how the policy is monitored,
legislation, best practice, and the Council’s organisational structure.  HR have monitoring arrangements
in place for the appointment of senior officers and typically will form part of the recruitment panel for
these roles however, there is no periodic monitoring on a sample basis for other roles. 
No training is provided to managers over the recruitment process other than the training Business
Applications provides on the use of the Talentlink system - HR have advised that training can be
provided on request and written guidance is available.
The Policy on the Use of Agency Workers was updated in 2019 however it could not be established
when the policy was approved.  The processes detailed in the policy for the ongoing authorisation of
agency workers are not operating as described in practice (ongoing authorisation is not given by DMT
and periodic reporting of agency workers is not in place), and  the policy mentions a conversion
process to fixed term contracts after 12 weeks for agency workers but lacks detail on how that process
should work in practice.
2.  New posts are
appropriately authorised
prior to recruitment and
advertisement.
Reasonable
Assurance
A digital workflow has been developed which provides an audit trail of the post authorisation of the
manager and the subsequent post authorisation by DMT.  Posts are not advertised until they are
authorised.  Segregation of duties is in place with the workflow being first authorised by the recruiting
manager, DMT authorisation, and then the workflow is updated following DMT by a Personal Assistant
(PA) to the Chief Officer or Director.  Financial Services receive details of all posts due to be approved
at DMT and regularly attend DMT and advise whether a budget is in place for the proposed posts. 
However, only the Children, Young People and Partnerships Directorate include the workflow unique
identification numbers in the new post staffing spreadsheet taken to DMT for approval; including this
strengthens the audit trail.  The staffing structure in the iTrent system contains many obsolete posts; it
has been advised that this is due to be addressed by the forthcoming iTrent project.
Page 37 of 128

Page 38

Objectives Conclusion Comments
3.  Applications are
completed, shortlisting and
interviews of candidates are
undertaken in accordance
with procedures and
appropriately documented
for each vacancy
Reasonable
Assurance
Appropriate processes are in place for reviewing applications and manager shortlisting which is
supported by the Talentlink system.  Shortlisting decisions and employee applications are held in the
Talentlink system.  There is guidance on the intranet for strength-based interviewing which in the past
required all recruiting managers to sign that they have read and understood the guidance, but this
check is no longer being completed by managers or monitored by HR and does not form part of the
recruitment pack issued to managers.  From 23 cases reviewed, on 9 occasions an interview template
was used that was a competency / job role-based interview and not a strength-based interview in line
with the Council's issued guidance. 
Applicant shortlisting information must be retained for 6 months from the date that recruitment has
been finalised.  However, this requirement is not included in the recruitment pack issued to recruiting
managers.  Testing identified that on 7 out of 23 occasions, the manager had shredded all of the
interview related documentation either after the candidate selection or following the start of the new
employee.
4.  Pre-employment checks
including verification of
qualifications, background
checks and reference
verifications are completed,
and onboarding processes
are complied with.
Limited
Assurance
The recruiting manager is responsible for confirming documents and collating all of the information for
submission to E&R as part of the onboarding workflow.  E&R have not adequately enforced the
requirement for managers to confirm that they have seen the original documentation in all cases.   
From a sample of 26 employees, only for 5 employees were key documents such as passport, driving
licence, and qualifications signed by Midlothian officers indicating that they have seen the original
documents; a Right to Work (RTW) check was not completed for 1 employee; and for 1 employee only
1 reference was obtained (the requirement is 2 references for external candidates).  The employer
reference template could be improved.  Recruiting managers appropriately obtain PVGs when required,
but consistent processes are not in place for managers to follow detailing when a level 1 disclosure
check is required.
5.  Appropriate pre-
employment checks are
completed for all agency
workers and the use of
agency workers are
monitored to ensure the
Council is receiving best
value and not creating any
additional commitments.
Limited
Assurance
The Council’s use of agency workers has increased significantly from £3.1m in 2019/20 to £7.8m in
2024/25.  The Agency workers for each directorate are not formally presented to DMTs for ongoing
authorisation (as required by the policy), only for initial authorisation, and periodic reporting is not in
place.  A workflow has been developed for recruiting managers to confirm every 3 months that the
agency worker is still with the Council, that they are still required, and to re-confirm the IR35 status of
the worker.  7 agency workers were noted that have been with the Council for over 4 years; all of these
workers are from the Place Directorate.  A number of services were noted that have significant agency
spend from suppliers that are not on any approved public sector framework.  The off-payroll
establishment in iTrent includes 79 workers who have left the Council, but their leaving date has not
been added to iTrent.  Internal Audit identified 17 agency workers who are currently working with the
Council but are not on the iTrent system. 
Page 38 of 128

Page 39

5
Areas where expected controls are met/good practice
No. Areas of Positive Assurance
1. Policies for Recruitment and Selection and Agency Workers are in place. 
2 Some procedural guidance of what is required for recruitment is detailed on the workflow forms themselves and an information pack is
submitted to recruiting managers when they start a new recruitment. 
3. There is guidance available on the staff intranet in relation to strength-based interviewing. 
4. Training is in place for the use of the Talentlink system.  From the sample of applications reviewed, the decision made on Talentlink
agreed to the staff member appointed.
5 A workflow has been developed which provides an audit trail of the post authorisation of the manager and the subsequent post
authorisation by DMT.  Posts are not advertised until they are authorised.
6 A workflow process has been developed for E&R to collect all relevant pre-employment data before a new employee starts with the
Council.  Most documents do appear to be collected before an employee starts with the Council. 
8 A workflow is in place for the authorisation of agency staff.  The workflow includes recruiting manager and DMT authorisation.
9 Processes have been developed for recruiting managers to confirm the IR35 status of agency workers as part of the onboarding and
on an ongoing basis.
10. Adult Social care has substantially reduced agency spend from £2.2million in 2023/24 to £1.1 million in 2024/25 as a result of a
review of safe staffing levels leading to a recruitment drive for permanent posts which has been very effective at reducing their agency
usage. 
Page 39 of 128

Page 40

Recommendation Grading/Overall Opinion Definitions
Recommendation Definition
High
Recommendations relating to factors fundamental to the success of the control objectives of the system.
The weaknesses may give rise to significant financial loss/misstatement or failure of business processes.
Medium Recommendations which will improve the efficiency and effectiveness of the existing controls.
Low
Recommendations concerning minor issues that are not critical, but which may prevent attainment of best
practice and/or operational efficiency.
Levels of Assurance Definition
Substantial Assurance A sound system of governance, risk management and control exists, with internal controls operating
effectively and being consistently applied to support the achievement of objectives in the area audited.
Reasonable Assurance
There is a generally sound system of governance, risk management and control in place. Some issues,
non-compliance or scope for improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited Assurance
Significant gaps, weaknesses or non-compliance were identified. Improvement is required to the system of
governance, risk management and control to effectively manage risks to the achievement of objectives in
the area audited.
No Assurance
Immediate action is required to address fundamental gaps, weaknesses or non-compliance identified.
The system of governance, risk management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited.
Page 40 of 128

Page 41

Audit Committee
Tuesday 30 September 2025
Item No 5.5
Audit Committee Annual / End of Term Report 2024/25
Report by Chair of the Audit Committee
Report for Decision
1 Recommendations
The Audit Committee is asked to approve the Audit Committee Annual /
End of Term Report 2024/25 (Appendix 1) and its self-assessments
using the CIPFA Audit Committees Guidance (Appendices 2 and 3)
and agrees that the Audit Committee Annual / End of Term Report
2024/25 should be presented to the Council.
2 Purpose of Report/Executive Summary
The purpose of this report is to provide Members with the Audit
Committee Annual / End of Term Report 2024/25, which sets out how
the Audit Committee has performed against its remit and the
effectiveness of the Audit Committee in meeting its purpose based on
the annual self-assessments of the Committee against best practice
and provides assurances to the Council.
It is important that the Council’s Audit Committee fully complies with
best practice guidance on Audit Committees to ensure it can
demonstrate its effectiveness as a scrutiny body as a foundation for
sound corporate governance of the Council.
The Chartered Institute of Public Finance and Accountancy (CIPFA)
Audit Committees Practical Guidance for Local Authorities and Police
2022 Edition (hereinafter referred to as CIPFA Audit Committees
Guidance) includes the production of an annual report on the
performance of the Audit Committee for submission to the Council. The
Audit Committee Annual / End of Term Report 2024/25 is appended to
this report as Appendix 1 for consideration.
Date 15 September 2025
Report Contact on behalf of the Chair of the Audit Committee:
Duncan Stainbank Tel No 01620 827353
duncan.stainbank@midlothian.gov.uk
Page 41 of 128

Page 42

2
3 Background
3.1 It is important that the Council’s Audit Committee fully complies with
best practice guidance on Audit Committees to ensure it can
demonstrate its effectiveness as a scrutiny body as a foundation for
sound corporate governance for the Council.
3.2 The Chartered Institute of Public Finance and Accountancy (CIPFA)
issued an updated guidance note Audit Committees Practical Guidance
for Local Authorities and Police 2022 Edition (hereinafter referred to as
CIPFA Audit Committees Guidance). It incorporates CIPFA’s Position
Statement: Audit Committees in Local Authorities and Police which sets
out CIPFA’s view of the role and functions of an Audit Committee.
3.3 The CIPFA Audit Committees Guidance includes the production of an
annual report on the performance of the Audit Committee against its
remit for submission to the Council.
4 Audit Committee Annual / End of Term Report 2024/25 and Self-
Assessments
4.1 The Audit Committee carried out self-assessments of Compliance
with the Good Practice Principles Checklist and Evaluation of
Effectiveness Toolkit from the CIPFA Audit Committees Guidance by
completing questionnaires in 2024 a meeting was attended by most of
the Audit Committee members in August 2025 to complete this years
annual evaluation. The combined self-assessments are appended to
this report as Appendix 2 (Good Practice Principles) and Appendix 3
(Effectiveness) for consideration.
4.2 The outcome of the self-assessments was a high degree of compliance
against the good practice principles and an improving and medium
degree of effectiveness. Improvements were identified focussing on
activity to improve its effectiveness in fulfilling its role. In summary
these are:
 Schedule a recruitment, selection and appointment process for
independent members of the Audit Committee within the next year.
 Provide members with a location on the Council shared drives for full
versions of the Internal Audit Reports to be placed to ensure that the
members always have full access to all Internal Audit reports.
 Consideration should always be given to making sure any national
reports presented to committee are only put forward with a Midlothian
specific covering paper providing appropriate information on the
elements relevant to Midlothian Council. 
 A private meeting between the Audit Committee members and External
Audit should be arranged during 2025.
4.3 The Audit Committee Annual / End of Term Report 2024/25 is
appended to this report as Appendix 1 for consideration. Midlothian
Council continues to adopt this best practice. It is designed both to
provide assurance to full Council and to share lessons learned and
areas of improvement.
Page 42 of 128

Page 43

3
5 Report Implications (Resource, Digital, Risk and Equalities)
5.1 Resource
The Council has provided support and resources to the Audit
Committee throughout the year including a Democratic Services Officer
as the Minute secretary.
In terms of accountability and independence to ensure conformance
with the Public Sector Internal Audit Standards (PSIAS) and prepare for
the Transition to Global Internal Audit Standards from 1st April 2025,
the Chief Internal Auditor reports functionally to the Audit Committee as
outlined within the Internal Audit Charter. The Chief Internal Auditor
facilitated the annual self-assessment process and the prepared the
Audit Committee Annual / End of Term Report on behalf of the Chair.
5.2 Digital
There are no digital implications arising from this report.
5.3 Risk
The role of the Audit Committee includes the high-level oversight of the
effectiveness of the Council’s systems of internal financial control,
internal control and governance, including risk management.
There is a risk that the Audit Committee does not fully comply with best
practice guidance thus limiting its effectiveness as a scrutiny body as a
foundation for sound corporate governance. The completion of the
annual self-assessment and identification of improvement actions as
evidenced through this Annual / End of Term Report will mitigate this
risk.
5.4 Ensuring Equalities
This report does not relate to a new or revised policy, service or budget
change, which affects people (the public or staff), so an Integrated
Impact Assessment (IIA) is not an applicable consideration.
5.5 Additional Report Implications (See Appendix A)
Page 43 of 128

Page 44

4
APPENDIX A – Additional Report Implications
A.1 Key Priorities within the Single Midlothian Plan
Although this report does not relate directly to the key priorities within
the Single Midlothian Plan to which Midlothian Council and its
Community Planning Partners have made a commitment (Reducing the
gap in economic circumstances; Reducing the gap in learning
outcomes; Reducing the gap in health outcomes; and Reducing the
impact of climate change), good governance is important to enable
Midlothian Council to deliver its key priorities in support of achieving the
Council’s objectives.
A.2 Key Drivers for Change
Key drivers addressed in this report:
Holistic Working
Hub and Spoke
Modern
Sustainable
Transformational
Preventative
Asset-based
Continuous Improvement
One size fits one
None of the above
Midlothian Council is committed to creating a great place to grow
supported by the 9 drivers for change. Self-assessment of the Audit
Committee utilising best practice toolkits underpins its own continuous
improvement to ensure that modern and sustainable governance
arrangements are in place.
A.3 Key Delivery Streams
Key delivery streams addressed in this report:
One Council Working with you, for you
Preventative and Sustainable
Efficient and Modern
Innovative and Ambitious
A.4 Delivering Best Value
Self-assessment of the Audit Committee utilising best practice toolkits
underpins its own continuous improvement to enhance its effectiveness
as a scrutiny body as a foundation for sound corporate governance of
the Council, thus supporting the delivery of the Council’s best value
duties.
Page 44 of 128

Page 45

5
A.5 Involving Communities and Other Stakeholders
The Audit Committee in fulfilling its governance role acts as a bridge
between the Council and other stakeholders.
A.6 Impact on Performance and Outcomes
The members of the Audit Committee have reflected on the
performance and outcomes against the remit of the Committee through
the completion of annual self-assessments. The identification of
improvement actions as evidenced through the Audit Committee
Annual / End of Term Report are designed to enhance its effectiveness
as a scrutiny body as a foundation for sound corporate governance of
the Council.
A.7 Adopting a Preventative Approach
Assurances received by the Audit Committee from Management,
Internal Audit and External Audit set out the assessment of prevention
and detection internal controls and governance arrangements.
A.8 Supporting Sustainable Development
This report does not relate directly to supporting sustainable
development. Good governance is important to enable Midlothian
Council to achieve its objectives.
Page 45 of 128

Page 46

Page 46 of 128

Page 47

APPENDIX 1
MIDLOTHIAN COUNCIL
AUDIT COMMITTEE
ANNUAL/END OF TERM REPORT FROM THE CHAIR – 2024/25
This annual/end of term report has been prepared to inform the Midlothian Council of the work carried
out by the Council’s Audit Committee during the year 2024/25. The content and presentation of this
report meets the requirements of the CIPFA Audit Committees Practical Guidance for Local Authorities
and Police 2022 Edition (hereinafter referred to as CIPFA Audit Committees Guidance) to report to full
Council on a regular basis on the Committee’s performance in relation to the terms of reference and
the effectiveness of the Committee in meeting its purpose.
Meetings
There were meetings of the Audit Committee 4 times during the financial year which included meetings
on 24 June 2024, 30 September 2024, 25 November 2024 and 24 February 2025 to consider reports
pertinent to the audit cycle and its terms of reference. Additionally at the start of the 2024/25 financial
year a meeting has been held on the 16 June 2025. 
The Audit Committee is a key component of Midlothian Council’s corporate governance. It provides an
independent and high-level focus on the audit, assurance and reporting arrangements that underpin
good governance and financial standards. The purpose of the audit committee is to provide
independent assurance to elected members of the adequacy of the risk management framework and
the internal control environment. It provides independent review of Midlothian Council’s governance,
risk management and control frameworks, and oversees the financial reporting and annual governance
processes. It oversees internal and external audit, helping to ensure efficient and effective assurance
arrangements are in place.
The Audit Committee reviewed the draft Annual Governance Statement 2023/24 at its meeting on 24
June 2024, and for 2024/25 at its meeting on the 16 June 2025 in order to assess whether it properly
reflects the risk environment and whether the content is consistent with its evaluation of the internal
controls and governance arrangements based on evidence received during the year. The Audit
Committee scrutinised the unaudited Annual Accounts 2024/25 of the Council at its meeting on 16
June 2025 and for a period until publication later in the month. It reviewed the final audited accounts
for 2023/24 at its meeting on 25 November 2024, alongside the External Audit report on their annual
audit 2023/24 to consider any concerns or improvements arising from the audit, prior to
recommending to the Council that they be adopted. The Audit Committee scrutinised the Annual
Report and Accounts of the Council at appropriate times in accordance with its terms of reference,
which also includes the promotion of good governance, and financial and ethical standards.
The Audit Committee approved the Internal Audit Charter, and the Internal Audit Strategy and Annual
Plan. It monitored Internal Audit’s performance including progress against annual plan approving
changes during the year, conformance with Public Sector Internal Audit Standards (PSIAS), which have
been replaced by the Global Internal Audit Standards (GIAS) from April 2025, and the quality assurance
and improvement plan (QAIP) arising from the External Quality Assurance Review reported to the Audit
& Governance Committee on the 16 June 2025, considered the statutory annual audit opinion within
the Annual Internal Audit Report. It considered Internal Audit’s reports which set out executive
summaries of findings, audit opinions, good practice and recommendations associated with each
assurance review, as well as other work. It monitored the implementation of agreed actions through
receipt of regular reports during the year from Internal Audit.
The Audit Committee has reviewed the External Audit Strategy and Plan Overview for Midlothian
Council, considered External Audit reports including the annual report to Members and the Controller
of Audit on the annual audit of the Council, reviewed the main issues arising from the External Audit
of the Council’s statutory accounts, and monitored the implementation of agreed actions arising.
Page 47 of 128

Page 48

The Audit Committee received quarterly update reports from the Chief Officer Place during the year
on strategic risks and mitigations. The Internal Audit Report on risk management concluded that
level of assurance was substantial in relation to the Council’s Risk Management Policy and
application of the policy at a strategic level. This review recommended some improvements to risk
reporting to the Audit Committee to provide an update on the status of service risk registers in
compliance with the Risk Management Policy which was due to be implemented in 2025. 
The Audit Committee considered the adequacy and effectiveness of the Council’s counter fraud
arrangements by way of an annual report which set out the counter fraud activity and outcomes
associated with the refreshed Counter Fraud Policy and Strategy approved by Council in August 2020.
The Audit Committee is the governance body responsible for scrutiny of the treasury management
strategy, mid-term and annual performance reports prior to their presentation to Council for approval,
in accordance with the CIPFA Treasury Management Code of Practice. This scrutiny occurred during
2024/25 at Audit Committee meetings including the Annual Treasury Management Outturn Report
2023/24 and a 2024/25 in June 2024/June2025, the Treasury Management Mid-Year Review Report
2024/25 in November 2024, and the Treasury Management and Investment Strategy 2025/26 &
Prudential Indicators in February 2025.
The minutes of Audit Committee meetings were presented for approval by the Council, and any
exceptional items or recommendations were referred to the Council in accordance with the remit.
Membership
The Membership of the Audit Committee reflects the Council’s approved Scheme of Administration i.e.
there should be a one third equal split on all Committees reflecting the number of Councillors for each
political party (May 2022), being five Members of the Council. A recruitment advert for an Independent
Audit Committee Chair and Member was issued in May 2022, however no candidates applied for these
positions, as a result agreement to rotate the Chair across the three political parties was agreed. The
lack of independent members does not comply with the CIPFA Position Statement which recommends
that each authority audit committee should include at least two co-opted independent members.
However, this situation is similar to many Local Authority Audit Committees. Approval has now been
given to recruit for up to 2 independent Audit Committee members during 2025. 
The Committee membership during the year included Councillors D Bowen, D McCall, W McEwan
(Chair from September 2024), D Milligan (Chair until September 2024), and P Smaill.
The attendance by each member at the Committee meetings throughout the year was as follows:
Member 24 June 2024 30 September 2024 25 November
2024
24 February 2025
Cllr D Bowen √ √ √ √
Cllr D McCall √ √ √ √
Cllr W McEwan √ √ √ √
Cllr D Milligan √ √ X √
Cllr P Smaill √ √ X √
Every Audit Committee meeting in 2024/25 was quorate and only one meeting was not attended by all
members. 
All other individuals who attended the meetings are recognised as being “In Attendance” only. The
Chief Executive, Executive Directors, Chief Financial Officer(Section 95 Officer), External Audit (Audit
Scotland), and Internal Audit attend all Audit Committee meetings, and other senior officers also
routinely attend Audit Committee meetings. The Council has provided support and resources to the
Audit Committee throughout the year including a Democratic Services Officer as the Minute secretary.
Page 48 of 128

Page 49

Skills and Knowledge
Given the wider corporate governance remit of Audit Committees within local government and the
topics now covered by the external and internal audit functions, it is noteworthy that there is a range
of skills, knowledge and experience that Audit Committee members bring to the committee, not
limited to financial and business management. This enhances the quality of scrutiny and discussion of
reports at the meetings. No one committee member would be expected to be expert in all areas.
Self-Assessment of the Committee
An annual self-assessment was carried out by members of the Audit Committee during August 2024
using the Good Practice Principles Checklist and Evaluation of Effectiveness Toolkit from the CIPFA
Audit Committees Guidance. This was useful for Members to ensure the Committee can demonstrate
its effectiveness as a scrutiny body as a foundation for sound corporate governance of the Council.
The outcome of the self-assessments was a medium/high degree of compliance against the good
practice principles and an improving and medium degree of effectiveness. Improvements were
identified focussing on activity to improve its effectiveness in fulfilling its role. In summary these are:
 Schedule a recruitment, selection and appointment process for independent members of the
Audit Committee within the next year.
 Provide members with a location on the Council shared drives for full versions of the Internal
Audit Reports to be placed to ensure that the members always have full access to all Internal
Audit reports.
 Consideration should always be given to making sure any national reports presented to
committee are only put forward with a Midlothian specific covering paper providing
appropriate information on the elements relevant to Midlothian Council. 
 A private meeting between the Audit Committee members and External Audit should be
arranged during 2025.
These actions will all be taken forward during 2025/26.
Assurance Statement to the Council
The Audit Committee provides the following assurance to the Council:
 The Council has received the Minutes of the Audit Committee throughout the year.
 The Audit Committee has operated in accordance with its agreed terms of reference, covering
the themes of Governance, Risk and Control, Internal Audit, External Audit, Financial Reporting,
and Accountability Arrangements, and accordingly conforms to the Audit Committee principles
within the CIPFA Position Statement for Audit Committees.
 It focused entirely on matters of risk management, internal control and governance, giving
specialist advice to the Council on the value of the audit process, on the integrity of financial
reporting and on governance arrangements, and acted as a bridge between the Council and
other stakeholders. It did this through material it received from Internal Audit, External Audit,
other Audit bodies, and assurances from Management relevant to Audit Cycle of reporting.
 The Audit Committee has reflected on its performance during the year, and has agreed areas
of improvement to enable enhanced effectiveness to fulfil its scrutiny and challenge role.
William McEwan
Chair of Audit Committee
30 September 2025
Page 49 of 128

Page 50

Page 50 of 128

Page 51

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition
Midlothian Council Audit Committee – self-assessment of Good Practice at 15 September 2025
Audit committee purpose and governance Yes/Partly
/No
Comments
Does the authority have a dedicated audit committee? The Council’s Scheme of Administration approved in May 2022 lists
the composition of the Council and its various Committees, including
the Audit Committee.
Does the audit committee report directly to full council?
Has the committee maintained its advisory role by not taking on
any decision-making powers?
All Minutes of Audit Committee are circulated to full Council for noting
and approval of any of their recommendations. An annual report is
submitted by the Chair of the Audit Committee to full Council.
Yes the Committee has no direct decision-making powers.
Do the terms of reference clearly set out the purpose of the
committee in accordance with CIPFA’s 2022 Position
Statement?
Terms of Reference of the Audit Committee are periodically reviewed
against CIPFA’s best practice by the Chief Internal Auditor.
Do all those charged with governance and in leadership roles
have a good understanding of the role and purpose of the
committee?
The role and purpose of the Audit Committee is set out in the Council’s
Scheme of Administration including what it can do, the arrangements
for meetings, required quorums etc. References to the role of the Audit
Committee are made and draft agendas and reports are presented to
the Corporate Management Team by the Chief Internal Auditor in
advance of each Audit Committee meeting.
Does the audit committee escalate issues and concerns
promptly to those in governance and leadership roles? The Audit Committee carries out the role set out in the Terms of
Reference contributing to the Council’s governance framework which is
set out in the Local Code of Corporate Governance approved by Council
in March 2021. All Minutes of the Audit Committee are circulated to full
Council for noting and approval of any recommendations.
Does the governing body hold the audit committee to account
for its performance at least annually? The Audit Committee annually reviews its terms of reference as part of
it carrying out a self-assessment of performance using best practice
checklists. An annual report is submitted by the Chair of the Audit
Committee to full Council. It sets out the activities to enable stakeholders
to understand how the Audit Committee has discharged its duties and
identifies areas of improvement to fulfil its remit. MLC continues to adopt
this best practice.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Page 51 of 128

Page 52

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition
Midlothian Council Audit Committee – self-assessment of Good Practice at 15 September 2025
Functions of the committee Yes/Partly
/No
Comments
Does the committee publish an annual report in
accordance with the 2022 guidance, including:
compliance with the CIPFA Position Statement 2022
results of the annual evaluation, development work undertaken
and planned improvements
how it has fulfilled its terms of reference and the key issues
escalated in the year?
Do the committee’s terms of reference explicitly address all the
core areas identified in CIPFA’s Position Statement?
See Appendix 1 evaluation against the statement does not have access
to independent members despite recruitment campaign. 
See Appendix 1 evaluation of previous issues.
 Governance arrangements Functions in Terms of Reference Nos. 1, 3 & 4
 Assurance framework Assurance Framework function in Terms of Reference No. 6 and explicit
references to these service delivery models in Nos. 3, 6 & 7 within the
revised Terms of Reference approved by Council in August 2019.
 Internal audit and Internal Control Arrangements
including:
o Financial management
o Value for money
o Ethics and standards
o Counter fraud and corruption
Functions in Terms of Reference Nos. 13-24 Function in Terms of
Reference No. 12 Treasury Management and explicit references to
ethics in Functions 3 & 19 within the revised Terms of Reference
approved by Council in August 2019.
 External audit Functions in Terms of Reference Nos. 25-29
Functions of the committee (cont’d) Yes/Partly Comments
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Page 52 of 128

Page 53

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition
Midlothian Council Audit Committee – self-assessment of Good Practice at 15 September 2025
/No
 Risk management arrangements Functions in Terms of Reference Nos. 6-8
 Annual Governance Statement Function in Terms of Reference No. 5
 Assurance framework Functions in Terms of Reference Nos. 9-11
Over the last year, has adequate consideration been given to
all core areas? Reports have been received that cover all core areas at meetings of
the Committee. .
Over the last year, has the committee only considered agenda
items that align with its core functions or selected wider
functions, as set out in the 2022 guidance?
The Audit Committee has only considered items that align with its
core functions.
Has the committee met privately with the external auditors and
head of internal audit in the last year?
A private meeting has taken place with the Head of Internal Audit in
2025 a meeting will now be held with External Audit following
conclusion of the 2025/26 work. 
Has the committee maintained its non-advisory role by not Has
the Committee been established in accordance with the 2022
guidance as follows:
Separation from the Executive
A size that is not unwieldy and avoids the use of substitutes
Inclusion of lay/co-opted independent members in accordance
with legislation or CIPFA’s recommendation.
Whilst during the year the committee membership included cabinet
members this has been resolved with new memebership.
Regular attendance by all members without substitutes evidences
compliance.
Despite a recruitment campaign lay members have not been
successful in identifying and independent members for the
Committee. A further campaign will occur in 2025. 
Yes
Yes
Yes
Yes
Yes
Yes
Partly
Yes
No
Page 53 of 128

Page 54

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition
Midlothian Council Audit Committee – self-assessment of Good Practice at 15 September 2025
Membership and support Yes/Partly
/No
Comments
Have all committee members been appointed or selected to
ensure a committee membership that is knowledgeable and
skilled. 
Elected Members on the Audit Committee are selected in accordance with the
arrangements set out in the Council’s Scheme of Administration. Committee
members bring a wide variety of skills, experience and knowledge. Continued
further training and development requirements will remain under review.
.
Has an evaluation of knowledge, skills and the training needs
of the chair and committee members been carried out within
the last two years?
Following the May 2022 local government elections and appointment to the
Audit Committee the elected members’ induction programme was completed,
having assessed the needs of the Council members.
Have regular training and support arrangements been put in
place covering the areas set out in the 2022 guidance?
Induction training has been provided for all member which covers key areas of
the 2022 guidance further training is being provided by The Chief Internal
Auditor.
Across the committee membership, is there a satisfactory level
of knowledge, as set out in the 2022 guidance?
The Committee members have satisfactory level of knowledge and experience
in all key areas.
Does the committee have good working relations with key
people and organisations, including external audit, internal audit
and the chief financial officer?
The independent Chair meets with Chief Internal Auditor (CIA) in advance of
each Audit Committee meeting and has the option to meet with External
Auditors, Audit Scotland, in private. The Chair has a pre-meeting with senior
management prior to each Audit Committee meeting to enable wider context of
Council business.
Is adequate secretariat and administrative support to the
committee provided? A Democratic Services Officer is assigned to the Audit Committee.
Has the committee obtained positive feedback on its
performance from those interacting with the committee or
relying on its work?
Are meetings well chaired, ensuring key agenda items are
addressed with a focus on improvement?
The Audit Committee will continue to obtain feedback on its performance
from senior management and the external auditor. External review feedback
of Internal Audit has been received by the Comittee
As reflected in the Minutes of the Committee.
Are meetings effective with a good level of discussion and
engagement from all members?
As reflected in the Minutes of the Committee.
As reflected in the Minutes of the Committee.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
YesPage 54 of 128

Page 55

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition
Midlothian Council Audit Committee – self-assessment of Good Practice at 15 September 2025
Has the Committee maintained a non-political approach to
discussions throughout?
Effectivenss of the committee Yes/Partly
/No
Comments
Does the committee engage with a wide range of leaders and
managers, including discussion of audit findings, risks and
action plans with the responsible officers?
The Chief Executive, Directors, and Section 95 Officer attend all Audit
Committee meetings and respond to members’ questions as appropriate for
the business being considered by the Committee to ensure action findings and
action plans are acted upon. The Chief Officer Place presents quarterly
updates to the Committee setting out the corporate risks and mitigations.
Does the committee make recommendations for the
improvement of governance, risk and control arrangements?
Recommendations are made by the Committee to Council in accordance with
the business considered by the Committee. An Action Tracker for Audit
Committee is in place to monitor completion of their recommended actions.
Do audit committee recommendations havetraction with those
in leadership roles?
Has the committee evaluated whether and how it is adding
value to the organisation?
The Chief Executive, Directors, and Section 95 Officer attend all Audit
Committee meetings and respond to members’ questions as appropriate for
the business being considered by the Committee to ensure action findings
and action plans are acted upon.
The Audit Committee carries out an annual self assessment of performance
against the CIPFA good practice checklist and the effectiveness toolkit from
the CIPFA guidance 2022 ‘audit committees’, the latter enabling evaluation of
how effectively it fulfils its Audit functions.
Does the committee have an action plan to improve any areas
of weakness?
As part of its annual self-assessment 2024/25 the Committee has recognised
where it could improve in respect of its scrutiny and challenge role to fulfil its
remit and to further add value. Improvements are set out within the Audit
Committee Annual/End of Term Report 2024/25.
Has this assessment been undertaken collaboratively with the
audit committee members?
This Assessment was carried out in response to a request to complete
assessment questionnaires sent to all Committee Members in July/August
2024.In addition a meeting was held with Audit Committee members in August
2025.
Yes
Yes
Yes
Yes
Yes
Yes
Page 55 of 128

Page 56

Page 56 of 128

Page 57

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition
Midlothian Council Audit Committee – self-assessment of Effectiveness 15 September 2025
Areas where the Audit
Committee can add value by
supporting improvement
Examples of how the audit committee can add value
and provide evidence of effectiveness
Self-evaluation, examples, areas of strength and
weakness
Overall
assessment
5-1 See key
below
1. Promoting the principles of
good governance and their
application to decision
making
Supporting the development of a local code of
governance.
Providing robust review of the Annual Governance
Statement (AGS) and the assurances underpinning it.
Working with key members/governors to improve their
understanding of the AGS and their contribution to it.
Supporting reviews/audits of governance
arrangements.
Participating in self-assessments of governance
arrangements.
Working with partner audit committees to review
governance arrangements in partnerships.
Committee scrutinised Local Code of Corporate
Governance, and recommended it for Council
approval in March 2021, and scrutinised AGS
within Annual Report and Accounts 2023/24
and 2024/25.
Pre-Meet withthe Chair prior to each
Committee meeting to provide wider context.
Committee supports the role of audit in
improving internal control and governance.
Committee considers national reports and self-
assessment toolkits.
Reliance on previous years’ informal liaison with
other Audit Committees e.g. MIJB.
5
(2023/24- 5)
2. Contributing to the
development of an effective
control environment.
Actively monitoring the implementation of
recommendations from auditors.
Encouraging ownership of the internal control
framework by appropriate managers.
Raising significant concerns over controls with
appropriate senior managers.
Committee received periodic progress reports
from Auditors e.g. follow-up activity.
Directors attended Committee meetings to
discuss progress with Audit actions.
Action Log used to monitor completion of
Committee recommendations.
5
(2023/24- 5)
3. Supporting the
establishment of
arrangements for the
governance of risk and for
effective arrangements to
manage risks.
Reviewing risk management arrangements and their
effectiveness, e.g. risk management benchmarking.
Monitoring improvements.
Holding risk owners to account for major/strategic
risks.
A revised Risk Management Policy and Strategy
was approved by Council in August 2022. The
Committee continues to receive quarterly
reports from Chief Officer Place on strategic
risks and mitigations, with Directors in
attendance. An Internal Audit review of risk
management recommended improvements to
reporting on Service Risk registers. 
4
(2023/24-4)
Page 57 of 128

Page 58

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition
Midlothian Council Audit Committee – self-assessment of Effectiveness 15 September 2025
Areas where the Audit
Committee can add value by
supporting improvement
Examples of how the audit committee can add value
and provide evidence of effectiveness
Self-evaluation, examples, areas of strength and
weakness
Overall
assessment
5-1 See key
below
4. Advising on the adequacy of
the assurance framework
and considering whether
assurance is deployed
efficiently and effectively.
Reviewing the adequacy of the leadership team’s
assurance framework.
Specifying the committee’s assurance needs,
identifying gaps or overlaps in assurance. Seeking to
streamline assurance gathering and reporting.
Reviewing the effectiveness of assurance providers, e.g.
internal audit, risk management, external audit.
Annual Strategies and Plans and periodic
progress Reports received from Auditors which
outline Governance and Assurance Framework,
in alignment with Audit Cycle.
Regular assurance reports provided on internal
control, governance & risk management.
4
(2023/24 - 4)
5. Supporting effective
external audit, with a focus
on high quality and timely
audit work.
Reviewing and supporting external audit arrangements
with focus on independence and quality.
Providing good engagement on external audit plans
and reports.
Supporting the implementation of audit
recommendations.
External Audit Annual Plans and reports are
submitted to the Committee and supported to
conclusion of recommendations. 4
(2023/24–4)
6. Supporting the quality of
the internal audit activity,
particularly by underpinning
its organisational
independence.
Reviewing the audit charter and functional reporting
arrangements.
Assessing the effectiveness of internal audit
arrangements, providing constructive challenge and
supporting improvements.
Actively supporting the quality assurance and
improvement programme (QAIP) of internal audit.
Committee considered and approved the
Internal Audit Charter.
Committee considered and approved the
Internal Audit Strategy and Plan, and regular
Internal Audit reports with recommendations.
Committee received Internal Audit QAIP and
PSIAS conformance within mid-term
performance and annual assurance reports.
5
(2023/24-5)
7. Aiding the achievement of
the authority’s goals and
objectives through helping
to ensure appropriate
governance, risk, control
and assurance
arrangements
Reviewing how the governance arrangements support
the achievement of sustainable outcomes.
Reviewing major projects and programmes to ensure
that governance and assurance arrangements are in
place.
Reviewing the effectiveness of performance
management arrangements.
Auditors provided audit review on governance
arrangements and financial sustainability.
Reliance on other Committees fulfilling their
remits (Business Transformation Steering
Group; Performance, Review and Scrutiny);
knowledge from members appointed on those
Committees used to evaluate their
effectiveness.
4
(2032/24-4)
Page 58 of 128

Page 59

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition
Midlothian Council Audit Committee – self-assessment of Effectiveness 15 September 2025
Areas where the Audit
Committee can add value by
supporting improvement
Examples of how the audit committee can add value
and provide evidence of effectiveness
Self-evaluation, examples, areas of strength and
weakness
Overall
assessment
5-1 See key
below
8. Supporting the
development of robust
arrangements for ensuring
value for money.
Ensuring that assurance on value for money
arrangements is included in the assurances received by
the audit committee.
Considering how performance in value for money is
evaluated in Annual Governance Statement (AGS).
Following up issues raised by external audit in their
value-for-money work.
Auditors provided assurance on value for
money arrangements e.g. sustainability, and
performance management.
AGS sets out the Governance Framework
including arrangements for best value.
4
(2023/24-4)
9. Helping the authority to
implement the values of
good governance, including
effective arrangements for
countering fraud and
corruption risks.
Reviewing arrangements against the standards set out
in the Code of Practice on Managing the Risk of Fraud
and Corruption (CIPFA, 2014).
Reviewing fraud risks and the effectiveness of the
organisation’s strategy to address those risks.
Assessing the effectiveness of ethical governance
arrangements for both staff and governors.
Committee received Counter Fraud Annual
Report associated with refreshed Counter Fraud
Policy and Strategy approved in 2020.
Committee has requested self-assessment of
fraud risks and counter fraud controls
associated with national reports, and received
assurance reports from Integrity Group.
5
(2023/24-5)
10. Promoting effective
public reporting to the
authority’s stakeholders
and local community and
measures to improve
transparency and
accountability.
Working with key members to improve their
understanding of the AGS and their contribution to it.
Improving how the authority discharges its
responsibilities for public reporting; for example, better
targeting at the audience, plain English.
Reviewing whether decision making through
partnership organisations remains transparent and
publicly accessible and encourages greater
transparency.
Publishing an annual report from the committee.
Committee scrutinised Annual Report and
Accounts 2023/24 including the enhanced
Management Commentary for stakeholders.
Reliance on health and social care governance
arrangements (Integration Joint Board; IJB Audit
and Risk Committee).
Audit Committee Annual Report presented to
Council in public.
4
(2023/24-4)
Assessment key
5 Clear evidence is available from a number of sources that the committee is actively supporting improvements across all
aspects of this area. The improvements made are clearly identifiable.
Page 59 of 128

Page 60

CIPFA ‘audit committees’ Practical Guidance for Local Authorities and Police 2022 Edition
Midlothian Council Audit Committee – self-assessment of Effectiveness 15 September 2025
Assessment key
4 Clear evidence from some sources that the committee is actively and effectively supporting improvement across some
aspects of this area.
3 The committee has had mixed experience in supporting improvement in this area. There is some evidence that
demonstrates their impact but there are also significant gaps.
2 There is some evidence that the committee has supported improvements, but the impact of this support is limited.
1 No evidence can be found that the audit committee has supported improvements in this area.
Page 60 of 128

Page 61

Risk Management Policy and Strategy
Derek Oliver, Chief Officer Place
Report for Decision
1 Recommendations
Audit Committee
Tuesday 30 September 2025
Item No 5.6
Audit Committee is recommended to approve the revised Risk Management
Policy and Strategy.
2 Purpose of Report/Executive Summary
Audit Committee is presented with the revised Risk Management
Policy and Strategy, which outlines the proposed approach to risk
management and governance arrangements for risk monitoring and
accountability.
Date: 19 September 2025
Report Contact:
Derek Oliver, Chief Officer Place, Derek.Oliver@midlothian.gov.uk
Page 61 of 128

Page 62

3 Background/Main Body of Report
3.1 The Council has seen unprecedented change over the last five years,
having successfully maintained critical services in response to a global
pandemic and then undergone a transformational change in terms of
workplace dynamics. It has demonstrated its competence to manage
risk effectively during this time and continued to operate within
increasing financial constraints.
3.2 Whilst the Council’s response has shown that risk has been managed
appropriately and proportionate mitigations have been applied, the
events of the last five years should be reflected in the Council’s risk
management approach going forward.
3.3 The Risk Management Policy and Strategy was last presented in
August 2022 and is due review. In addition, in February 2024, an
Internal Audit report identified additional recommendations to enhance
the effectiveness of the Council’s risk management approach. These
have been incorporated into the revised Risk Management Policy and
Strategy.
Risk Management Policy and Strategy - summary
3.4 Midlothian Council acknowledges that risk can never be eliminated in
its entirety. The Council also recognises that managing risk can also
identify positive opportunities which, with the appropriate level of
control, may lead to service improvements. Therefore, the measures
which the Council adopts are principles of good management practice
which seek to control and balance risk and opportunity.
Specifically, in the area of risk management, the Council seeks to:
 Always meet its statutory obligations, and act within the law.
 Safeguard the public at large, the Council's members,
employees, pupils, tenants and all people to whom the Council
has a duty of care.
 Protect its property, including buildings, equipment, vehicles or
any other assets and resources.
 Preserve and enhance service delivery.
 Maintain effective control of public funds.
 Maintain and enhance the Council's reputation.
 Safeguard and enhance the quality of Midlothian’s environment.
3.5 The main objective of the revised Policy and Strategy is to ensure
that risk management is an integral part of the Council's corporate
and service management, forms part of the Council's governance,
planning and service delivery operations and allows for monitoring
and reporting on the effectiveness of that strategy.
Page 62 of 128

Page 63

3.6 The Policy and Strategy applies to all of Midlothian Council’s core functions.
Where Midlothian Council enters into partnerships, contracts and agreements
the same principles of risk management established by this policy and
strategy and supporting guidance, should be considered as best practice and
applied where possible. It is also expected that our significant contractors
have risk management arrangements at a comparable level, which
should/must be established and monitored through commissioning processes
and contract management arrangements.
3.7 It is essential that a single risk management approach be utilised at all levels
throughout the Council. By demonstrating good governance through effective
management of risks and opportunities, the Council will be in a stronger
position to deliver its objectives, provide improved services to the public, work
better as a partner with other organisations and achieve value for money.
3.8 Risk management is a part of service and corporate/strategic
management and accordingly is integrated within normal management
processes. The Chief Executive has overall responsibility for the
management of risk within Midlothian Council. The Chief Officer Place
has responsibility for ensuring that the Council’s Risk Management
Strategy, Policy and Strategic Risk Register are maintained and
regularly reviewed.
3.9 The Chief Officer Place, who Chairs the Strategic Risk & Resilience Group,
reports on updates to the Strategic Risk Register every quarter to Council
Management Team and the Audit Committee, or when a new significant risk
is identified.
3.10 The Strategic Risk & Resilience Group membership is drawn from Chief
Officers and Senior Managers across the Council and provides
recommendations to the Council Management Team on the escalation, de-
escalation and closure of strategic level risks.
3.11 Similarly, Directorates and Services are required to undertake quarterly review,
monitoring and reporting on their service risk registers (supported by the risk
management function) to ensure that risks are identified and escalated to the
appropriate level at an early stage where that is appropriate. All risk registers
are recorded and maintained on the Pentana Risk Management system.
3.12 The internal audit report of February 2024 expressed some weaknesses in
these processes and detailed a number of recommendations as to how the
Council’s risk management could be improved, namely:
 The creation of terms of reference for the Strategic Risk and Resilience
Group (see Section 6.9 of revised risk Management Policy & Strategy
report – Appendix B).
 The reinstatement of the officer level Risk & Resilience Group which
ceased to meet in 2021. Terms of reference for this group are also
detailed in the revised Risk Management Policy (Section 6.10). The
main function of this group will be to consider risks at service level rather
than strategic level and to provide support and guidance to service
managers.
 The need to draw up independent action plans for each Critical Risk to
ensure they remain critical for no longer than absolutely necessary
(Section 6.9 & 10.20).
Page 63 of 128

Page 64

 The introduction of reporting mechanisms so that regular formal updates
can be presented to the Audit Committee on compliance with the Risk
Management Policy and the status of service risk registers in general
(Section 6.6 and 9.2).
 To ensure that the Council’s Strategic Risk Register links to
organisational objectives (section 6.9).
 To ensure significant project risks are identified and included as part of
the Council’s performance reporting arrangements and risk
management framework (Section 6.9).
 Appropriate risk management procedures, guidance, training, and
support be provided to management including the creation of an e-
learning module, mandatory for relevant managers (Section 3.3 & 6.10).
3.13 All these recommendations, together with the additional of updated technical
guidance, have been incorporated into the revised Risk Management Policy
and Strategy which is contained in Appendix B. Council is asked to consider
and approve the contents within.
4 Report Implications (Resource, Digital and Risk)
4.1 Resource
Recommendation 5.3 within Internal Audit’s report on Risk Management,
February 2024, identifies that the level of risk management resource required
to support the Council should be considered as part of the review of Health,
Safety, Risk and Resilience.
The arrangements required in re-establishing and maintaining the Risk &
Resilience Group will require staff time and commitment. There will also be
individual impacts on service risk managers when carrying out risk
assessments and related mitigation actions. These will have to be managed by
the respective service.
4.2 Digital
The Risk Management Policy and Strategy is a document held within
Sharepoint and available on the Intranet. Risk registers/profiles are stored
within Pentana which is an existing Council system. There are no additional
requests relating to Digital, therefore no impact.
4.3 Risk
The risk of not having a robust Risk Management Policy and Strategy is that
the Council does not fulfil its statutory duty. Good governance leads to good
management, good performance, good stewardship of public money, good
public engagement and, ultimately, good outcomes for citizens and service
users.
4.4 Ensuring Equalities (if required a separate IIA must be completed)
The Risk Management Policy and Strategy will ensure that that Council meets
its statutory requirements including those under the Equalities Act 2010. The
Risk Management Policy and Strategy will help the Council to safeguard the
public at large, the Council's members, employees, pupils, tenants and all
people to whom the Council has a duty of care.Page 64 of 128

Page 65

4.4 Additional Report Implications (See Appendix A)
See Appendix A
Appendices
 Appendix A – Additional Report Implications
 Appendix B – Risk Management Policy and
Strategy
Page 65 of 128

Page 66

APPENDIX A – Report Implications
A.1 Key Priorities within the Single Midlothian Plan
Risk management is an integral part of the Council's corporate and
service management, forms part of the Council's governance, planning
and service delivery operations and allows for monitoring and reporting
on the effectiveness of that strategy. The Risk Management Policy and
Strategy should underpin all the priorities within the Single Midlothian
Plan.
A.2 Key Drivers for Change
Key drivers addressed in this report:
Holistic Working
Hub and Spoke
Modern
Sustainable
Transformational
Preventative
Asset-based
Continuous Improvement
One size fits one
None of the above
A.3 Key Delivery Streams
Key delivery streams addressed in this report:
One Council Working with you, for you
Preventative and Sustainable
Efficient and Modern
Innovative and Ambitious
None of the above
A.4 Delivering Best Value
The Council’s commitment to best value and securing continuous improvement
can best be delivered when decisions are made against a backdrop of
understanding the risks and opportunities before an organisation. The Risk
Management Policy and Strategy seeks to provide the framework in which the
current risk environment is understood and demonstrate that Midlothian
Council is taking appropriate action in response to those identified risks.
A.5 Involving Communities and Other Stakeholders
The Risk Management Policy and Strategy was informed by the Risk
and Resilience Group, Corporate Management Team and Audit
Committee.
Page 66 of 128

Page 67

A.6 Impact on Performance and Outcomes
Formal monitoring and accountability procedures form an integral part of
the risk management process, covering the following three main issues:
 Delivering the risk management strategy.
 Implementing risk management action plans, both corporate/strategic
and service.
 Determining whether the related actions are making a difference to the
risk, as appropriate.
A.7 Adopting a Preventative Approach
The Risk Management approach being taken by the Council is founded on a
preventative approach to managing risks, where appropriate and more
generally to decision making with far greater risk awareness.
A.8 Supporting Sustainable Development
Senior Managers must ensure the sustainability of the Council, which entails
identifying, understanding and managing Strategic and Service level Risks and
Opportunities.
Page 67 of 128

Page 68

Page 68 of 128

Page 69

Midlothian Council
Risk Management Policy & Strategy 2025
MIDLOTHIAN COUNCIL
RISK MANAGEMENT POLICY & STRATEGY
Page 69 of 128

Page 70

Midlothian Council
Risk Management Policy & Strategy 2025
CONTENTS
Section TOPIC Page No.
1.0 Policy Statement 3
2.0 Terminology 4
 Governance 4
 Risk 4
 Risk Management 4
 Effective Risk Management 4
3.0 Objectives 5
4.0 Approach 5
5.0 Status of Risk Management 6
6.0 Management Arrangements & Responsibilities 6
 Chief Executive 7
 Chief Officer – Place 7
 Executive Directors 7
 Chief Officers 7
 Senior Managers 7
 Council Management Team 7
 Strategic Risk & Resilience Group 8
 Risk & Resilience Group 8
 Audit Committee 9
7.0 Health & Safety 9
8.0 Business Continuity 9
9.0 Monitoring and Accountability 9
10.0 Approach to Risk Management 10
 Risk Management Process 10
 Risk Identification 10
 Risk Elements 11
 Risk Types 11
 Risk Analysis & Assessment 13
 Risk Matrix 14
 Risk Evaluation 14
 Risk Controls & Actions 14
 Risk Appetite, Tolerance and Escalation 15
 Risk Review 15
 Risk Reporting 15
11.0 Review 15
Appendix A – Risk Matrix
Page 70 of 128

Page 71

Midlothian Council
Risk Management Policy & Strategy 2025
1. Policy Statement
1.1 Risk is present in everything we do. The Council understands the importance of recognising
and managing the many risks which are inherent in its activities, and in the services which it
provides for the benefit of the community. To do this properly it is important to have a competent
and healthy risk management culture across the Authority, throughout our activities, partnerships,
and projects, with judgement based on an understanding of the risk and the level of exposure
that is acceptable. The Council has therefore adopted this risk management policy and strategy
and has implemented procedures to support its delivery.
1.2 The main objective of this policy is to ensure that risk management is made integral part
of the Council's corporate and service management, forms part of the Council's governance,
planning and service delivery operations and allows for monitoring and reporting on the
effectiveness of the strategy.
1.3 The Local Authority and our partners will over time experience a wide range of significant
risks. The different types of risks are detailed further in this policy document. However,
Midlothian Council acknowledges that risks occur at all levels of the Council's functions and
activities and can never be eliminated in their entirety. The Council also recognises that
managing risk can identify positive opportunities which, with the appropriate level of control,
may lead to service improvements. Therefore, the measures which the Council adopts are
principles of good management practice which seek to control and balance risk and
opportunity.
1.4 Specifically, in the area of risk management, the Council seeks to:
 Always meet its statutory obligations, and to act within the law.
 Safeguard the public at large, the Council's members, employees, pupils, tenants
and all people to whom the Council has a duty of care.
 Protect its property, including buildings, equipment, vehicles or any other assets
and resources.
 Preserve and enhance service delivery.
 Maintain effective control of public funds.
 Maintain and enhance the Council's reputation.
 Safeguard and enhance the quality of Midlothian’s environment.
1.5 The Council will promote these objectives by systematically identifying, evaluating, and
thereafter seeking to control and monitor all foreseeable risks which would potentially
endanger, or which could have a detrimental effect upon the aims and objectives stated
above.
1.6 The Council will support its members and officials in developing the necessary skills and
competencies to enable the provision of good quality risk management within the Council.
1.7 Managing risk is the responsibility of everyone and needs to be reflected in the actions of
all (staff and elected members). There is a commitment to embed risk management
throughout Midlothian Council, promote a positive risk culture and make it a part of everyday
service delivery and decision-making, while ensuring that sufficient resources are also
allocated to this. This includes fostering an environment that embraces openness, supports
integrity, objectivity, accountability and transparency in the identification, assessment and
management of risks, welcoming constructive challenge and promoting collaboration,
consultation and cooperation.
1.8 This policy and strategy applies to all of Midlothian Council’s core functions. Where
Midlothian Council enters into partnerships, contracts and agreements, the same principles
of risk management established by this policy and strategy and supporting guidance, should
be considered as best practice and applied wherever possible. It is also expected that our Page 71 of 128

Page 72

Midlothian Council
Risk Management Policy & Strategy 2025
significant contractors have risk management arrangements at a comparable level, which
should / must be established and monitored through commissioning processes and contract
management arrangements.
1.9 Risk Management enhances strategic planning and prioritisation, assists in achieving
objectives and strengthens organisational agility to respond to challenges. To meet our
organizational objectives, improve service delivery and achieve value for money for the
residents of Midlothian, risk management will be an essential and integral part of planning
and decision-making.
1.10 Midlothian is the fastest growing local authority area in Scotland. Within the Council’s
Transformation Blueprint is a commitment to reducing inequalities in health outcomes, learning
outcomes and economic circumstances while addressing the health of the planet. Its strategic
goal is to create a wellbeing economy where the people and the environment of Midlothian
flourish and are put first.
1.11 All of these strategic and corporate aspirations require careful planning, competent staff,
resources, plant, and materials to come to fruition and inevitably this comes with both risks and
opportunities. The risk culture must therefore be an active and healthy one with a drive and
motivation to place risk at the top of the agenda.
1.12 This risk management and policy strategy will provide a proactive and systematic approach
to support the management of risk and will inform decisions including resource allocation to
ensure continuity of essential Council services.
2. Terminology
2.1 Governance
The system by which local authorities fulfil their purpose and achieve their intended
outcomes for citizens and service users and operate in an effective, efficient, economic and
ethical manner. Good governance leads to good management, good performance, good
stewardship of public money, good public engagement and, ultimately, good outcomes for
citizens and service users.
2.2 Risk
Simply put, risk is the effect of uncertainty on objectives. This can be further defined as “the
combination of the likelihood of an event occurring (or not occurring, as the case may be)
and its impact on the organisation”. This can be both positive or negative. However, the main
priority of Midlothian Council, being a public sector organisation, is to protect itself against
negative risk, the chance or possibility of loss, damage, injury or failure to achieve objectives
caused by an unwanted or uncertain action or event.
2.3 Risk Management
The planned and systematic approach to the identification, evaluation and control of risk. The
objective of risk management is to secure the assets and reputation of the organisation and
to ensure the continued financial and organisational well-being of the Council. All
organisations exist to achieve their objectives. The purpose of risk management is to
manage the barriers in achieving these objectives.
2.4 Effective Risk Management
Having a process in place that can identify what might go wrong, what the consequences of
that might be and deciding what can be done to reduce or eliminate the likelihood of it
occurring. In the event that something does go wrong, effective risk management is also
about taking steps to ensure that the impacts are kept to a minimum whilst still achieving
organisational objectives.
Page 72 of 128

Page 73

Midlothian Council
Risk Management Policy & Strategy 2025
3. Objectives
3.1 Midlothian Council is committed to establishing and maintaining a systematic approach to
the identification and management of risk.
3.2 The Council’s risk management objectives are to:
 Ensure that risk management is clearly and consistently integrated and evidenced
in the culture of the Council.
 Actively manage and reduce risk in accordance with best practice.
 Anticipate and respond to changing political, economic, social, technological, legal
and environmental factors and influences.
 Ensure compliance with health and safety, insurance and legal requirements as a
minimum standard.
 Prevent death, injury, damage and losses, and reduce the cost of incidents and
accidents.
 Inform policy and operational decisions by identifying risks and their likely impact.
 Raise awareness of the need of risk management by all those connected with the
Council's delivery of service.
 Encourage positive risk taking and the identification of opportunities.
3.3 These objectives will be achieved by:
 Clearly defining the roles, responsibilities and reporting lines within the Council for
risk management.
 Setting out clear risk management processes.
 Continuing to demonstrate the application of risk management principles in the
activities of the Council, its employees and members.
 Reinforcing the importance of effective risk management as part of the everyday
work of employees and members.
 Maintaining a register of strategic risks and opportunities relevant to the Council's
business and strategic objectives, including those linked to working in partnerships.
 Maintaining registers of risks relevant to every Council service.
 Maintaining documented procedures for the control of risk and provision of suitable
information, training and supervision.
 Maintaining an appropriate system for recording health and safety incidents,
responses and identifying preventative measures against recurrence.
 Preparing contingency plans to secure business continuity where there is a
potential for an event to have a major impact upon the Council's ability to function
or the delivery of its critical services.
 Monitoring arrangements continually and seeking continuous improvement.
4. Approach
4.1 It is essential that a single risk management approach be utilised at all levels throughout
the Council. By demonstrating good governance through effective management of risks and
opportunities, the Council will be in a stronger position to deliver its objectives, provide
improved services to the public, work better as a partner with other organisations and
achieve better value for money.
4.2 This approach to risk management will inform the Council's business processes,
including:
 Strategic planning.
 Financial planning.
 Service planning.
 Policy making and review.
 Performance management.
 Project management.
 Partnership working.
Page 73 of 128

Page 74

Midlothian Council
Risk Management Policy & Strategy 2025
4.3 It is essential in order to achieve the objectives referred to in section 3 that processes are
in place to identify and assess risks and opportunities, develop and implement controls and
warning mechanisms, and to review and report on progress.
4.4 The identified risks and relevant control measures will be managed through the Council's
Strategic Risk Register.
4.5 There are five key principles of risk management that provide the basis on which
Midlothian Council will manage risk:
A. Governance and Leadership – risk management shall be an essential part of
governance and leadership, and fundamental to how the organisation is directed,
managed and controlled at all levels.
B. Integration – risk management shall be an integral part of all organisational activities
to support decision-making in achieving objectives.
C. Collaboration and Best Information – risk management shall be collaborative and
informed by the best available information.
D. Structured Processes – risk management processes are recognised as iterative in
practice, rather than sequential, and shall be structured to include:
 Risk Identification and Assessment – to determine and prioritise how the
risks should be managed.
 Risk Treatment – the selection, design and implementation of risk treatment
options that support achievement of intended outcomes and manage risks to an
acceptable level.
 Risk Monitoring – the design and operation of integrated, insightful and
informative risk monitoring.
 Risk Reporting – timely, accurate and useful risk reporting to enhance the
quality of decision-making and to support management and oversight bodies in
meeting their responsibilities.
E. Continual Improvement – risk management shall be continually improved through
learning and experience.
5. Status of Risk Management
5.1 Risk management is as much a part of the duties of Council officials as, for example, the
control of budgets or the deployment of staff and assets. It is one of many substantive issues
to be considered by elected members when making decisions. If the Council is to have
reasonable assurance that risk management is effective, and is effectively part of the
Council's operations, it must be carried out in a systematic and structured manner and be
subject to monitoring and reporting on its effectiveness.
6. Management Arrangements & Responsibilities
6.1 Risk management is an essential part of service and corporate / strategic management
and accordingly, is integrated within normal management processes. The Risk Management
Reporting Framework below illustrates the Council’s risk management structure:
Page 74 of 128

Page 75

Midlothian Council
Risk Management Policy & Strategy 2025
6.2 The Chief Executive has overall responsibility for the management of risk within
Midlothian Council.
6.3 Chief Officer – Place has responsibility for ensuring that the Council’s Risk Management
Strategy, Policy and Strategic Risk Register are maintained and regularly reviewed. Risk
owners will be clearly identified within the Strategic Risk Register. The register will be
reviewed quarterly, or where a new significant risk is identified. This will then be presented to
the Council Management Team for approval and thereafter to the Audit Committee.
6.4 Executive Directors are responsible for ensuring the Strategic Risk Register is compiled
and maintained in respect of their Service.
6.5 Chief Officers are responsible for ensuring all known risks falling within their service
portfolio are reviewed quarterly. They must also ensure that any new or emerging risks are
immediately assessed and evaluated.
6.6 Senior Managers will ensure that Service Risk Registers are reviewed quarterly, or
where a new risk is identified. Any identified risk which has a wider corporate impact will be
escalated to the Strategic Risk Register.
6.7 The Corporate Management Team (CMT) shall:
 Determine the levels of risk and outcomes that are tolerable and acceptable to
achieve the Council's objectives.
 Provide advice to elected members on the type and amount of risk to accept when
making policy decisions.
 Assume ownership of the strategic risks recorded in the Strategic Risk Register.
 Carry out a strategic overview of the Strategic Risk Register quarterly.
 Promote and support the implementation of the risk management policy and
strategy throughout the Council.
Page 75 of 128

Page 76

Midlothian Council
Risk Management Policy & Strategy 2025
6.8 Identified risks will be allocated to an officer of the CMT and each risk will be
accompanied by an assessment of likelihood and impact. Registers will be accompanied by
related actions, highlighting the means by which the risk will be controlled.
6.9 The Strategic Risk & Resilience Group sits at a strategic level and so has membership
drawn from Chief Officers and Senior Managers across the Council. The group, chaired by the
Chief Officer-Place, meets quarterly (minuted) and its purpose is to:
 review and update the Council’s Strategic Risk Register.
 provide a quarterly report to CMT and the Audit Committee  
 ensure that the Council’s Strategic Risk Register links to organisational objectives.
 ensure significant project risks are identified and included as part of the Council’s
performance reporting arrangements and risk management framework
 identify strategic issues, risks and opportunities to be included in the strategic risk
register.
 define strategic issues and risks and identify control measures to reduce or
eliminate any adverse impacts on the Council.
 define strategic opportunities and identify appropriate control measures to ensure
these are fully utilised.
 identify ownership of strategic risks and opportunities recorded in the Strategic Risk
Register.
 assess and evaluate the levels of risk (likelihood and impact) and decide whether
these are tolerable and acceptable to achieve Council objectives.
 identify necessary actions and timescales and to draw up independent action plans
for each “Critical” risk to ensure they remain critical for no longer than absolutely
necessary. 
 consider strategic issues, risks and opportunities brought to its attention by the Risk
& Resilience Group or other Council forums. 
 promote and support the implementation of the risk management policy throughout
the Council and to ensure that adequate resources are provided to enable its full
implementation.
6.10 The Risk & Resilience Group (RRG) membership consists of a representative from
each Senior Management level service area of the Council. This is not a decision-making
body, as recommendations that have a strategic or corporate impact are referred to the
Strategic Risk & Resilience Group and Council Management Team. The group will sit at a
tactical/operational level and will:
 promote a culture of risk awareness and resilience throughout the Authority
 receive and consider risk management updates from each service as a standing agenda
item at each quarterly meeting of the group (minuted).
 assist with the development, review (2 yearly), and application of the Risk Management
Policy.
 provide a platform to identify any issues which may affect compliance with the Risk
Management Policy.
 provide advice, suggestions or comment on the content of the strategic risk register to the
Strategic Risk & Resilience Group.  
 provide a forum for peer support and motivation.
 facilitate the provision of risk management advice and training to nominated risk
management leads.
 share examples of risk management best practice with risk officer leads.
 report and escalate concerns to relevant Service Teams and the Strategic Risk &
Resilience Group, as appropriate.
 promote the development of resilience strategies to ensure business continuity and the
ability to respond effectively to disruption.
 have wider responsibilities in relation to Business Continuity as outlined in the Council’s
Business Continuity Plan, namely:
o including business continuity updates as a standing agenda item at each meeting
of the group.
Page 76 of 128

Page 77

Midlothian Council
Risk Management Policy & Strategy 2025
o providing a platform to identify any issues which may affect compliance with the
requirements outlined in the Corporate Business Continuity Plan.
o escalating any concerns to Divisional Management Teams and Corporate
Management Team as appropriate.
6.11 The Audit Committee evaluates and recommends approval of the strategies and
frameworks in respect of risk management. The Committee approves updates and provides
direction in respect of risks held within the strategic risk register.
7. Health & Safety
7.1 The Council has responsibilities under health and safety legislation to ensure the health,
safety and welfare at work of employees and other people affected by the Council's
business. Managing health and safety risks is an integral part of business risk management
and the management of such risks should not be taken in isolation. Poor health and safety
management can have a negative impact on other business risks such as reputation,
insurance, business continuity and financial resources.
7.2 The effective management of health and safety risks, as with all significant corporate
risks, is an essential part of the role of managers. The organisation and arrangements for
managing health and safety within the Council are detailed in the Council’s Health and Safety
Policy and associated management arrangement documents.
8. Business Continuity
8.1 The business continuity process is essentially risk management applied to the whole
organisation and its ability to continue with its service provision in the event of a catastrophic
or a localised operational impact event. The Council ensures risk management processes
are applied throughout the business continuity lifecycle.
9. Monitoring and Accountability
9.1 Formal monitoring and accountability procedures form an integral part of the risk
management process, covering the following three main issues:
 Delivering the risk management policy.
 Implementing risk management action plans, both corporate/strategic and at
service level.
 Determining whether the related actions are making a difference to the risk
evaluation, as appropriate.
9.2 The following monitoring arrangements are in place:
 The Strategic Risk Register is presented to the Audit Committee quarterly to advise
members of the risks and opportunities which may affect the achievement of the
Council’s strategic objectives.
 Service risks and the status of service risk registers are monitored through
quarterly performance reports so that any performance risks are highlighted to the
Council Management Team through exception reporting.
 Annual reporting on compliance with the Risk Management Policy and the status of
service risk registers Council wide.
 Ensuring that the Strategic Risk & Resilience Group and Risk & Resilience Group
continue to be an effective and streamlined means of maintaining an overview of
risk management and supporting corporate and strategic consistency in the
implementation of the risk management policy.
 Internal audit of risk management processes across the Council and the reporting on
the efficiency and effectiveness of internal controls.
Page 77 of 128

Page 78

Midlothian Council
Risk Management Policy & Strategy 2025
10. Approach to Risk Management
Risk Management Process
10.1 The diagram below, illustrates the process and cycle of risk management. This is taken
from the international standard ISO 31000 which provides principles and guidelines for risk
management.
10.2 This demonstrates that risk management is a dynamic process, requiring frequent
review of existing risks and monitoring of the environment to ensure that the risks captured
represent the current profile of the organisation.
10.3 Continual communication of risks within the organisation is essential to allow for
informed decision-making. Communication to the Audit Committee and other stakeholders is
imperative to allow effective scrutiny and provide assurance that all risks are being effectively
managed.
10.4 Risk Identification
The aim of risk identification is to recognise and articulate the risks that may help or prevent
Midlothian Council achieving its objectives. It is particularly relevant to consider new or
emerging risks alongside business planning and strategy formulation processes.
There are several risk categories:
Corporate - would have a major impact on the organisation or delivery of its
priorities. Corporate risks also include cross-cutting risks that impact across
directorates.
Change related (Programme / Project) – where we are exposed to risks that could
affect our ability to successfully complete the desired transformational outcomes or
deliver predefined outputs that enable us to deliver outcomes and realise benefits.
Operational / Service / Contract – where we are exposed to risks that could affect
Page 78 of 128

Page 79

Midlothian Council
Risk Management Policy & Strategy 2025
our control and ability to successfully and continually deliver or commission services
to our service users / residents.
10.5 The Risk Elements are normally expressed in terms of causes, events and
consequences (see diagram below).
A Cause is an element which alone or in combination has the potential to give rise to
risk.
An Event is an occurrence or change of a set of circumstances and can be
something that is expected which does not happen or something that is not expected
which does happen. Events can have multiple causes and consequences and can
affect multiple objectives.
The Consequences, should the event happen, are the outcome of an event affecting
objectives, which can be certain or uncertain, can have positive or negative direct or
indirect effects on objectives, can be expressed qualitatively or quantitively, and can
escalate through cascading and cumulative effects.   
A practical use of this model could be illustrated as follows:
10.6 Risk Types: (Taken from HM Govt The Orange Book 2023)
Page 79 of 128

Page 80

Midlothian Council
Risk Management Policy & Strategy 2025
Strategy risks – Risks arising from identifying and pursuing a strategy, which is poorly
defined, is based on flawed or inaccurate data or fails to support the delivery of
commitments, plans or objectives due to a changing macro-environment (for example,
political, economic, social, technological, environment and legislative change).
Governance risks – Risks arising from unclear plans, priorities, authorities and
accountabilities, and/or ineffective or disproportionate oversight of decision-making and/or
performance.
Operations & Continuity Risks – Risks arising from inadequate, poorly designed or
ineffective/inefficient services/processes resulting in impaired customer service (quality
and/or quantity of service), fraud, error, non-compliance and/or poor value for money.
Legal risks – Risks arising from a defective transaction, a claim being made (including a
defence to a claim or a counterclaim) or some other legal event occurring that results in a
liability or other loss, or a failure to take appropriate measures to meet legal or regulatory
requirements or to protect assets (for example, intellectual property.)
Safety risks – Risks arising from safety deficiencies or poorly designed or
ineffective/inefficient hazard management resulting in non-compliance and/or harm and
suffering to employees, contractors, service users or the public.
Financial risks – Risks arising from not managing finances in accordance with
requirements and financial constraints resulting in poor returns from investments, failure
to manage assets/liabilities or to obtain value for money from the resources deployed,
and/or non-compliant financial reporting.
Commercial risks – Risks arising from weaknesses in the management of commercial
partnerships, supply chains and contractual requirements, resulting in poor
performance, inefficiency, poor value for money, fraud, and/or failure to meet business
requirements/objectives.
People risks – Risks arising from ineffective leadership and engagement, suboptimal
culture, inappropriate behaviours, the unavailability of sufficient capacity and capability,
industrial action and/or non-compliance with relevant employment legislation/HR policies
resulting in negative impact on performance.
Technology risks – Risks arising from technology not delivering the expected services
due to inadequate or deficient system/process development and performance or
inadequate resilience.
Information risks – Risks arising from a failure to produce robust, suitable and
appropriate data/information and to exploit data/information to its full potential.
Security risks – Risks arising from a failure to prevent unauthorised and/or inappropriate
access to the estate and information, including cyber security and non-compliance with
General Data Protection Regulation requirements.
Project/programme risks – Risks that change projects and programmes are not aligned
with strategic priorities and do not successfully and safely deliver requirements and
intended benefits to time, cost and quality.
Reputational risks – Risks arising from adverse events, including ethical violations, a
lack of sustainability, systemic or repeated failures or poor quality or a lack of innovation,
leading to damages to reputation and/or destruction of trust and relations.
10.7 Failure to manage risks in any of these categories may lead to financial, reputational,
Page 80 of 128

Page 81

Midlothian Council
Risk Management Policy & Strategy 2025
legal, regulatory, safety, security, environmental, employee, customer and operational          
consequences. 
10.8 The following factors, and the relationship between these factors, should be considered
when identifying risks:
 Changes in the external and internal context
 Causes and events
 Consequences and their impact on objectives
 Threats and opportunities
 Vulnerabilities and capabilities
 Uncertainties and assumptions within options, strategies, plans or initiatives
 Indicators or emerging risks
 Limitations of knowledge and reliability of information
 Time-related factors
 Any potential biases and beliefs of those involved.
10.9 Risks will be identified whether or not their sources are under the Council’s direct
control, as they have the potential to impact on achievement of objectives, causing great
damage or creating significant opportunity.
10.10 Risk Analysis and Assessment
The aim of risk analysis is to build understanding of the nature of risk and its characteristics
including, wherever possible, the level of risk. It involves consideration of uncertainties, risk
sources, consequences, likelihood, events, scenarios, controls and their effectiveness.
Analysis techniques can be qualitative, quantitative or a combination of these, depending on
the circumstances and intended use.
10.11 The assessment, or scoring, of risk allows for prioritisation by evaluation. Determining
the likelihood and impact of a risk and utilising a standardised assessment criteria to assign a
score based on these factors allows the Council to understand and prioritise which risks to
mitigate first.
10.12 The descriptives in the table below are taken from the Council’s Risk Matrix and
illustrates the scoring system used to attribute scoring to degrees of Likelihood and Impact.
The more likely that a risk will be realised, or the greater the impact it will potentially have on
the organisation, the higher the score. 
10.13 The Council’s Risk Matrix as illustrated in Appendix A, includes guidance for each
level and type of Impact, e.g. financial, time, reputation, legal etc. The overall impact
descriptive/score to be used in the risk assessment is the one that corresponds to the type of
impact with the greatest negative effect
10.14 When both the likelihood and impact scores are applied to the risk matrix (see below),
the risk is then given an overall rating as either, Very Low, Low, Medium, High or Critical.
SCORE LIKELIHOOD IMPACT
5 Certain Critical
4 Likely Major
3 Possible Moderate
2 Unlikely Minor
1 Remote Minimal
Page 81 of 128

Page 82

Midlothian Council
Risk Management Policy & Strategy 2025
RISK MATRIX
IMPACT
1
Minimal
2
Minor
3
Moderate
4
Major
5
Critical
5
Certain
5
LOW
10
MEDIUM
15
MEDIUM
20
HIGH
25
CRITICAL
4
Likely
4
LOW
8
LOW
12
MEDIUM
16
HIGH
20
HIGH
3
Possible
3
VERY LOW
6
LOW
9
MEDIUM
12
MEDIUM
15
MEDIUM
2
Unlikely
2
VERY LOW
4
LOW
6
LOW
8
LOW
10
MEDIUM
LIKELIHOOD
1
Remote
1
VERY LOW
2
VERY LOW
3
VERY LOW
4
LOW
5
LOW
As indicated by the downward diagonal arrow, the direction of travel is always to actively
reduce risk. 
10.15 Risk Evaluation
Once analysed, risks will be evaluated to compare the results against the nature and extent
of risks that the organisation is willing to take or accept to determine where and what
additional action is required.
10.16 Risk Controls & Actions
Risk controls are management measures put in place to effectively manage a risk to within
acceptable levels (i.e. within target score). It is essential that the controls put in place to
manage a risk are effective. The identification of effective controls is the most important part
of the whole risk management process as without this element the Council would simply be
identifying risks and doing nothing to manage them.
There are two main types of control measure that can be put in place to manage a risk:
 Preventative Controls: These are mitigating actions which will work to control the
cause of the risk and prevent it happening in the first place.
 Contingency Controls or Mitigating Actions: These are actions that can be put
in place to reduce the impact of the risk when it does materialise.
Page 82 of 128

Page 83

Midlothian Council
Risk Management Policy & Strategy 2025
10.17 Risk Appetite, Tolerance and Escalation
Midlothian Council recognises that risk is inherent in delivering and commissioning services
and does not seek to avoid all risk, but instead aims to have an ‘open’ approach to risk,
appropriately balancing risk against reward, with risks managed in a proportionate manner.
10.18 This will require an approach that allows flexibility and support for well-informed and
considered risk taking, promoting transparency and effective risk management, while
maintaining accountability. While risks defined as “critical” or ‘high’ are to be actively
managed down to a tolerable level wherever possible, it is important that risks across the
Authority are not over-controlled.
10.19 It is not realistic for the Council, with its diverse range of services and duties, to have
just one definitive application of risk appetite across the entire organisation. Instead, risk
appetite should be set with reference to the strategy for service delivery in each particular
area. However, examples of risks viewed as intolerable are those that are likely to:
 Negatively affect the safety of our service users, residents or employees.
 Severely damage the Authority’s reputation.
 Lead to breaches of laws and regulations.
 Endanger the future operations of the Local Authority (i.e. by exceeding the risk
capacity of the organisation – the amount of risk that the Authority can bear).
 Adversely impact the financial security or resilience of the Council.
10.20 In addition, to aid managers in understanding what risks are acceptable, our appetite
for risk is implicitly defined within our standard for determining risk levels. Risks rated as
“Critical” will be deemed to have exceeded tolerance levels and will be subject to escalation
to the Strategic Risk & Resilience Group for review and action. The target rating for a risk is
expected to be ‘medium’ or lower. In the event that this is not deemed realistic in the short to
medium term, this shall be discussed as part of the escalation process, and this position
regularly reviewed with the ultimate aim of bringing the level of risk to a tolerable level.
Independent action plans will be drawn up for each “Critical” risk to ensure they remain
critical for no longer than absolutely necessary.
10.21 Risk Review
Once the process of identifying, analysing and assessing a risk are complete, it is imperative
that it is subject to regular review. Ongoing management and review of a risk is the most
important part of the process as maintaining or reducing the risk score to within an
acceptable level assures the overall management of the organisation’s risk profile.
10.22 During a risk review, the risk is re-assessed. If it is identified that the risk continues to
exist, the list of current controls and further controls required must be checked, cross-
referenced and added to where necessary. On the basis of progress with controls and an
assessment of the risk environment, a re-assessment of the current score must be made
using the risk assessment matrix. This will show whether the risk is decreasing, increasing or
remaining static. Depending on its escalation level, a change to risk score will be reported at
the Audit Committee.
10.23 Risk Reporting
A quarterly risk management report is presented to the Audit Committee which reports on the
Council’s strategic risks. In addition, the Council Management Team is provided with a
regular risk management report on strategic and organisational risks. The Strategic Risk &
Resilience Group provides recommendations to the Council Management Team on the
escalation, de-escalation and closure of strategic level risks. Directorates and services
undertake quarterly review, monitoring and reporting on their risk registers (supported by the
risk management function), in order to ensure that risks are identified and escalated to the
appropriate level at an early stage.
11. Review
11.1 This Risk Management Policy will be reviewed every two years and presented to CMT
Page 83 of 128

Page 84

Midlothian Council
Risk Management Policy & Strategy 2025
for approval.
Name of Document Risk Management Policy and Strategy
Author Place
Policy Ownership Chief Officer Place
Unit Responsible Protective Services
Approved by and date
Assigned Review Period 2 years from approval date
Date of Next Review September 2027 (subject to Audit Committee
approval)
Policy Lead Senior Manager, Protective Services
Page 84 of 128

Page 85

Midlothian Council
Risk Management Policy & Strategy 2025
Appendix A
Page 85 of 128

Page 86

Page 86 of 128

Page 87

Audit Committee
Tuesday 30 September 2025
Item No 5.7
Strategic Risk Management– Strategic Risk Profile Quarter 1, 2025-26
Report by Derek Oliver, Chief Officer Place
Report for Information
1 Recommendations
Audit Committee is recommended to:
 Note the current risk landscape and organisational response to
the most significant risks in Quarter 1, 2025-26 (1st April to 30th
June 2025).
2 Purpose of Report/Executive Summary
The purpose of this report is to provide Audit Committee with:
 An update on the risk responses Midlothian Council has
implemented during Q1 2025/26 to respond to the current risk
climate
 Assurance that Midlothian Council took a proportionate and
planned approach to prepare and respond to the current risk
climate
 The risk evaluation of current strategic risks and opportunities
for the Council
10 September 2025
Report Contact:
Derek Oliver, Chief Officer Place
Derek.Oliver@midlothian.gov.uk
Page 87 of 128

Page 88

3 Q1 Risk Management Overview
3.1 Midlothian Council has delivered a wide range of services to the people
of Midlothian throughout Quarter 1, 2025-26.
3.2 The Council continues to manage and review risks recorded within the
Strategic Risk Profile. The work required to maintain the necessary
corporate oversight over the broader strategic landscape continues
through the Risk and Resilience Chief Officer Group and Corporate
Management Team (CMT).
3.3 Audit Committee should note that there were no new risks added from
the previous Quarter however, as per the request from Audit
Committee, the Strategic Opportunities section was revised to include
Strategic Projects.  The Projects included have a Red category across
their respective Risk Evaluation. Updates on actions taken are included
in the full strategic risk profile (Appendix B).
3.4 Strategic Risk Profile (SRP)
The SRP is split into three sections:
 Strategic Issues
 Strategic Risks
 Opportunities
3.5 STRATEGIC ISSUES - SUMMARY
Strategic issues Likelihood Impact Score Evaluation
Q1 Q4
The Change Programme 5 5 25 Critical Critical
Financial Sustainability 5 5 25 Critical Critical
3.6 The Change Programme
The Change Programme remains evaluated at Critical. The financial
challenges of the forecasted budget gap pose a significant challenge
for benefits realisation. Council agreed to a Transformation Blueprint in
June 2023 which is a 5-year transformation plan.
3.7 Financial Sustainability
The scale of the financial challenge continues to be reported to the
Business Transformation Steering Group and Council.
Page 88 of 128

Page 89

3.8 STRATEGIC RISKS – SUMMARY
EvaluationStrategic Risks Likelihood Impact Score Q1 25-26 Q4 24-25
Financial Sustainability in
Future Years 5 5 25 Critical Critical
The Long-Term Change
Programme 5 5 25 Critical Critical
Legal and Regulatory
compliance 5 5 25 Critical Critical
Climate Change 5 5 25 Critical Critical
Emergency Planning and
Business Continuity 4 5 20 High Medium
Growing Council 4 4 16 High High
Scottish Child Abuse Inquiry 4 4 16 High High
Health & Safety/Fire Safety 4 4 16 High Medium
Asset Management 3 5 15 Medium Medium
Cost of Living Crisis 3 5 15 Medium Medium
Cyber Security 3 5 15 Medium Medium
Counter Terrorism 3 4 12 Medium
Employee Performance 3 4 12 Medium Medium
Care at Home 3 4 12 Medium Medium
Governance and Standards 2 4 8 Low Low
Internal Control
Environment 2 3 6 Low Low
Corporate Policies and
Strategies 2 3 6 Low Low
3.9    STRATEGIC RISKS – RATED CRITICAL/HIGH
3.10 Financial Sustainability in future years
The scale of the financial challenge continues to be reported to
Business Transformation Steering Group and Council.
Page 89 of 128

Page 90

3.11 The Long-Term Change Programme
The Change Programme has remained at Critical for the last 2 years.
The financial challenges of the underlying budget gap pose a
significant challenge. Council agreed to a Transformation Blueprint in
June 2023 which is a 5-year transformation plan.
3.12 Legal and Regulatory compliance
Significant resourcing pressures have impacted on risk evaluation. 
Work is ongoing with the Scottish Information Commissioner and
National Records of Scotland to develop and deliver improvement
plans.
3.13 Climate Change
Councillors were presented with a briefing on the Climate Action Plan
in Q2 24-25 as committed to through the Transformation Blueprint. 
With a report presented to October Council, Councillors approved,
given the challenges (particularly financial), the realignment of the
target deadline of 2030 for net zero emissions from the Midlothian
Council estate to 2045. 
In light of this, a refresh of the Council’s Climate Change Strategy,
approved by Council in August 2020, is progressing.
3.14 Emergency Planning and Business Continuity
Ongoing monitoring of a changing landscape and maintaining
organisational readiness and preparedness. Increase in evaluation
score aligned to internal audit of Risk Management, specifically in
relation to a focus on resource, service risk registers and business
continuity planning, as previously reported to Committee.  This work is
progressing.
3.15 Growing Council
The risk evaluation remains High in Q1 2025-26. This is in response to
the current financial challenge as described above and the increased
pressure the Council faces with growth. Some current examples of this
include:
 Inflationary impact on the delivery of the capital programme
 Cost of living crisis
 Pressure on the care sector as people are living longer and
require more care provision
 General population growth places additional demand on
infrastructure such as GPs, schools, waste services etc.
3.16 Scottish Child Abuse Inquiry (SCAI)
The SCAI risk evaluation remains High as the Inquiry continues.
Page 90 of 128

Page 91

3.17 Health & Safety/Fire Safety
Reviewing Fire Safety audits continue across our estate.  Estate Safety
& Maintenance Groups refreshed to identify and action any priority
safety or repairs matters.
3.18 STRATEGIC OPPORTUNITIES
3.19 Capital Projects - Housing
Projects impacted with 26% reduction in Affordable Housing Supply
Programme grant to Midlothian and continued high build costs.  Phase
5 housing programme has been reviewed to ensure affordability within
the Housing Revenue Account, allowing for reduced levels of grant. 
Projects highlighted with specific Red Risk Evaluation(s) and detailed
within the SRP are Newbyres, Gorebridge; Edmonstone Road,
Shawfair and Newton Church Road, Danderhall.
3.20 Capital Projects – Transport, Net Zero & Infrastructure
Cost of delivering enabling infrastructure projects has risen, resulting in
significant funding gap emerging and impacting on progress of A701
Relief Road, Sustainable Transport Corridor and Straiton Junction
Improvements, which are detailed within the SRP.
3.21 Capital Projects – Children, Young People & Partnerships Estates
Programme: Primary
Five specific projects identified within the SRP:
1. Mayfield/St Lukes PS New Build: Tender return from Stage 1
exceeds available budget. Programme delayed for project revision.
2. Kings Park PS Extension & Refurbishment: No available budget to
undertake extension. Condition and suitability of school to be
addressed.
3. Rosewell PS Extension: No available budget to undertake
extension. Condition and suitability of school to be addressed.
4. Mauricewood PS Extension & Refurbishment: Rising roll and
catchment review requires investment in school to address capacity
and suitability. Limited budget available.  Design team appointed to
develop investment in school that aligns with budget available from
Developer Contributions.
5. Bilston PS Extension: Rising roll and catchment review requires
investment in school to address capacity and suitability. Limited
budget available.  Design team appointed to develop investment in
school that aligns with budget available from Developer
Contributions.
Page 91 of 128

Page 92

3.22 Capital Projects – Children, Young People & Partnerships Estates
Programme: Secondary
Three specific projects identified within the SRP:
1. Beeslack HS Replacement:  Contractor appointment delayed.
Programme behind due to changes in scope / design. 
2. Shawfair All Through: Site acquisition complete. School location
fixed with design team. Remediation programme being revised.
Seeking to make efficiencies in remediation programme.
3. Penicuik HS New Build: LEIP target for delivery is Dec 2026,
however programme for occupation is July 2027. Cost reports
tracking higher and risks identified in refurbishment works.   SFT
advising if additional LEIP funding available.
3.23 Capital Projects – Regeneration
Three specific projects identified within the SRP:
1. Vogrie Changing Places: now progressing following contractor
issues.
2. Destination Hillend: Alpine Coaster delivered with access and
parking infrastructure. Project absorbed risk and contingency. 
Delays to delivery resulting from issues with access / water mains.
Main Building tender return exceeded budget. Next Phase to be
recast. Interim works on water supply and drainage required.
3. Hopefield Industrial Estate: Updated financial model required.
3.24 City Region Deal
Edinburgh and South East Scotland City Region Deal - bid for funding
to Scottish and UK Governments to accelerate economic growth
through investment in infrastructure/ housing/ skills and innovation was
agreed by Council in June 2018.  Projects continue to be progressed
with realisation of regional enhancements and connectivity.
Page 92 of 128

Page 93

4 Report Implications (Resource, Digital and Risk)
4.1 Resource
There are no direct resource implications indicated in this report,
although individual risks have associated resource implications.
4.2 Digital
None
4.3 Risk
The risks reported in this report are understood with the Council able to
demonstrate the current risk controls and actions being taken in
response to these.
The report provides an overview of the significant risks faced by the
Council during Quarter 1 2025-26 and should act to provide assurance
that Midlothian Council took a proportionate and planned approach to
prepare and respond to each of these risks.
4.4 Ensuring Equalities (if required a separate IIA must be completed)
There are no direct equalities issues arising from this report.
4.5 Additional Report Implications (See Appendix A)
See Appendix A
Appendices
Appendix A – Additional Report Implications
Appendix B – Strategic Risk Profile (Quarter 1, 2025-26)
Page 93 of 128

Page 94

APPENDIX A – Report Implications
A.1 Key Priorities within the Single Midlothian Plan
This report provides an overview of the Strategic Risk Profile of
Midlothian Council at a defined point in time. The issues, risks and
opportunities affecting or supporting delivery of the council priorities are
set out within the Strategic Risk Profile.
A.2 Key Drivers for Change
Key drivers addressed in this report:
Holistic Working
Hub and Spoke
Modern 
Sustainable 
Transformational
Preventative
Asset-based
Continuous Improvement
One size fits one
None of the above
A.3 Key Delivery Streams
Key delivery streams addressed in this report:
One Council Working with you, for you
Preventative and Sustainable
Efficient and Modern 
Innovative and Ambitious 
None of the above
A.4 Delivering Best Value
The Council’s commitment to best value and securing continuous
improvement can best be delivered when decisions are made against a
backdrop of understanding the risks and opportunities before an
organisation. This report seeks to provide assurance that the current
risk environment is understood and that Midlothian Council is taking
appropriate action in response to those identified risks.
A.5 Involving Communities and Other Stakeholders
This Strategic Risk Profile report has been compiled with input from a
range of internal key stakeholders.
Page 94 of 128

Page 95

A.6 Impact on Performance and Outcomes
This report seeks to provide an overview of the challenging risk
environment within which the Council is operating at this time. Being in
a risk aware position helps to inform current and future decision
making, with the intention of enhancing decision making and the
associated performance and outcomes which flow from well informed
decision making.
A.7 Adopting a Preventative Approach
The Risk Management approach being taken by the Council is founded
on a preventative approach to managing risks, where appropriate and
more generally to decision making with far greater risk awareness.
A.8 Supporting Sustainable Development
Senior Managers must ensure the sustainability of the Council, which
entails identifying, understanding and managing Strategic and Service
level risks and opportunities.
Page 95 of 128

Page 96

Page 96 of 128

Page 97

1
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
STRATEGIC RISK PROFILE, Q1 April - June 2025
STRATEGIC RISK PROFILE
SRP This risk register captures the main strategic issues, risks and opportunities that are corporate in nature. It identifies the nature of the risks, measures required to control the risks and their evaluation. It also
details what further actions are required to reduce the likelihood and impacts of those risks to more acceptable and manageable levels with timescales.
Strategic Issues
SRP.IR.02 The Change Programme
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.IR.
02
Risk cause
The pace of transformation strands of
activity, reporting to the Business
Transformation Board, does not secure
service transformation, delivery of
outcomes or benefit realisation. 
Risk event
Delayed progress or non-achievement of
outcomes and benefits. 
Risk effect
Slow or delayed financial benefits arising
from service redesign, requiring the
adoption of recovery plans or requiring
short term service reductions which impact
on the Council’s ability to deliver against
its priorities.
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
1. Transformation Blueprint agreed at Council June 2023 which is a 5-
year transformation plan. Revised governance for transformation agreed
and revised Terms of Reference in place for the Business Transformation
Board to oversee progress on change programme.
2. Regular reporting to Council setting out scale of financial challenge
ahead with recurring expenditure for current service delivery projected to
exceed recurring income.
3. Cross Party Business Transformation Steering Group are given
updates on the progress of the Transformation programme. 4. Financial
monitoring reports and work of the Corporate Management Team
evidence continued financial sustainability, in so far as services are
delivered within the overall budget in year. 
5 5
Page 97 of 128

Page 98

2
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SPR.RA
-02.08 Transformation Blueprint 2023-28 delivery
Q1 25/26: As per previous quarters
Q4 24/25: As Q3 24/25
Q3 24/25: As Q2 24/25.
Q2 24/25: Progress with sprints is reported to BTB at every meeting via the
dashboard and also in detailed reports at some points. BTSG are provided with
an updated dashboard every cycle and receive focused reports on individual
sprints and also funding requests to release BT funds to support project work.
Q1 24/25: As Q4 23/24.
Chief *Executive;
Chief Officer
*Place; Chief
Officer Corporate
Solutions; Chief
Finance Officer;
30-Jun-2028 20%
SRP.RA
.02.03
Develop Medium Term Financial Strategy
with greater oversight, clearer
responsibility and accountability.
Q1 25/26: Updated MTFS projections to 2028/29 were presented to
Council in June 2025. A further update will be provided in quarter 3 of
25/26.
Q4 24/25: MTFS projections to 2028/29 were presented to Council in February
2025 as part of setting the 2025/26 budget and accompanying Council Tax
levels. A further update will be provided to Council during Q1 of 25/26.
Q3 24/25: An update on the MTFS was presented to Council in December along
with outcomes from the public consultation. Detailed analysis of emerging
national budget positions for 2025/26 was presented and discussed at the
Business Transformation Group.
Q2 24/25: Further update on the MTFS was presented to Council in October
and a public consultation was launched on 9th October running to 20th
November.
Q1 24/25: An update on the MTFS was presented to Council in June 2024. This
identifies immediate actions required, in addition to those in the Transformation
Blueprint, to bridge the gap between recurring expenditure and recurring
income and to allow the setting of a balanced budget for 2025/26.
Chief *Executive;
Chief Finance
Officer;
30-June-2024 100%
Page 98 of 128

Page 99

3
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
SRP.IR.07 Financial Sustainability
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.IR.
07
Risk cause
Scottish Government Grant settlements
fall short of the resources needed to
sustain core services. Core funding falling
short of inflation pressures, pay awards
and demographic pressures arising from
an Increasing ageing population of over
75’s.
Increasing population of 0-15 age group
and at a time when there are rising
customer expectations. 
Risk event
Transformation activity and the flexibility
available to Councils as part of the grant
settlement does not address future years
projected budget gaps. 
Risk effect Inadequate government
funding makes securing balanced budgets
challenging. This in turn erodes the
Council’s ability to deliver services to the
community and potentially means that
resources available fall short of those the
Council assess as required to meet its
statutory obligations. Whilst transformation
activity can help reshape services and
ensure best value in the delivery of
services it is not a solution to continued
erosion of core funding.
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
1. There is an approved Capital Strategy and Reserves Strategy in place.
The Capital Strategy is being updated in the context of ongoing and
significant infrastructure pressures.
2. There is an approved budget for 2024/25. Services are delivered
within the totality of that budget.
3. Enhanced monitoring arrangements have been agreed for service
areas that are regularly showing overspends.
4. Directorates have budget boards in place to monitor and agree actions
for those items which are identified as needing specific attention or
present a risk to the financial position of services.
5. Strategic Boards in place and BTB focus and attention on driving
transformation to support future year’s financial sustainability.
6. Working through COSLA to influence government spending decisions
to influence Scottish Government’s budget allocation to Councils.
7. Capital Plan and Asset Management Board will scrutinise and
challenge slippage on capital programmes recognising that slippage can
have an adverse impact on financial sustainability and also the delivery
on assets required to support capital growth.
8. Chief Executive continues to emphasise the need for effective financial
control and underlined the benefit to the organisation of such an
approach. 
9. Scottish Governments May 2022 Resource Spending Review provided
planning parameters for term of parliament, albeit these are challenging
and present a real terms reduction in grant funding of circa 7% over the
period.
10. Report to Council February 2024 sets out scale of financial challenge
ahead with recurring expenditure for current service delivery projected to
exceed recurring income. Updated MTFS projections presented in June
2024 with a further update presented in February 2025.
11. Cross Party Business Transformation Steering Group engaged in
consideration of measures to secure balanced budgets alongside the
development of a Strategic Plan to support decisions about what
services, beyond those which are statutory can be provided. 
12. Income Generation
5 5
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SPR.RA
-02.09 Transformation Blueprint 2023 to 2028
Q1 25/26: Refer to SRP.RA-02.08
Q4 24/25: Refer to SRP.RA-02.08
Chief *Executive;
Chief Finance
Officer;
30-Jun-2024 20%
Page 99 of 128

Page 100

4
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Q3 24/25: Refer to SRP.RA-02.08
Q2 24/25: Refer to SRP.RA-02.08
Q1 24/25: As Q4 23/24.
SRP.RA
.02.03
Develop Medium Term Financial Strategy
with greater oversight, clearer
responsibility and accountability.
Q1 25/26: Refer to SRA.RA-02.03
Q4 24/25: Refer to SRP.RA-02.03
Q3 24/25: Refer to SPR.RA-02.03
Q2 24/25: Refer to SPR.RA-02.03
Q1 24/25: An update on the MTFS was presented to Council in June 2024. This
identifies immediate actions required, in addition to those in the Transformation
Blueprint, to bridge the gap between recurring expenditure and recurring
income and to allow the setting of a balanced budget for 2025/26.
Chief *Executive;
Chief Finance
Officer;
30-June-2024 100%
SRP.RA
-02.10 Capital Plan Prioritisation
Q1 25/26: Work evaluating information flowing from building condition
surveys continues with a view to presenting a draft building Asset
Management Plan to Council in October.
Q4 24/25: Council in February received an update on Capital Plan Prioritisation
work and made a decision on an updated Learning Estate Strategy. The extent
and affordability of work flowing from building condition surveys is being
assessed and will be concluded and reported to Elected Members early in
2025/26.
Q3 24/25: Work continues on Capital Plan Prioritisation
Q2 24/25: Work continues on Capital Plan prioritisation
Q1 24/25: Work continues on Capital Plan prioritisation
Chief Finance
Officer; Executive
Director – Place;
Executive Director
- Education
31-Oct-2024 0%
Page 100 of 128

Page 101

5
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Strategic Risks
SRP.RR.01 Financial Sustainability in Future Years
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.01
Risk cause:
Scottish Government Grant settlements
fall short of the resources needed to
sustain core services. Core funding falling
short of inflation pressures, pay awards
and demographic pressures arising from
an Increasing ageing population of over
75’s.
Increasing population of 0-15 age group
and at a time when there are rising
customer expectations.
Policy decisions by UK & Scottish
Governments which are not fully funded.
Changes to the responsibilities of Local
Government and the funding implication
that arise from that, particularly in respect
of the creation of a National Care Service.
Future year pay award settlements. 
Risk event:
Real terms reduction in core grant
settlements.
Policies decisions at Government level not
fully funded to Council's.
Implementation of a National Care Service
and impact on grant settlements.
Securing the extent of change required in
order to deliver financial sustainability and
a change program that recognises the size
of the challenge.
Cost pressures exceeding budget
estimates.
Risk to not achieving financial
sustainability is a failure to deliver cost
reductions / service change embedded in
the blueprint and also supplementing the
blueprint.
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
1. Development of Strategic Plan, Transformation Blueprint and MTFS
projections which come together to provide a framework to effect change
and to move the Council to a position of financial sustainability.
2. Maintaining a level of reserves to deal with unforeseen or one-off cost
pressures.
3. Capital and Reserves Strategies in place. The Capital Strategy is
being updated in the context of ongoing and significant infrastructure
pressures.
4. Working through COSLA to influence government spending decisions
to influence Scottish Government’s budget allocation to Councils.
5. Implement a lobbying strategy with government to recognise the
unique position Midlothian Council is in.
6. Best Value Audit report actions.
7. Strategic Boards in place to drive transformation in line with the
Transformation Blueprint.
8. Dedicating capacity to understand impact of NCS Bill, but limited
details mean this is challenging and many unanswered questions (refer
to specific risk on NCS for further detail). 
5 5
Page 101 of 128

Page 102

6
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.02.03
Develop Medium Term Financial Strategy
with greater oversight, clearer
responsibility and accountability.
Q1 25/26: Refer to SRP.RA-02.03
Q4 24/25: Refer to SRP.RA-02.03
Q3 24/25: Refer to SRP.RA-02.03
Q2 24/25: Refer to SRP.RA-02.03
Q1 24/25: An update on the MTFS was presented to Council in June 2024. This
identifies immediate actions required, in addition to those in the Transformation
Blueprint, to bridge the gap between recurring expenditure and recurring
income and to allow the setting of a balanced budget for 2025/26.
Chief *Executive;
Chief Finance
Officer;
30-June-2024 100%
SRP.RA
.02.04 Transformation Blueprint 2023 to 2028
Q1 25/26: Refer to SRP.RA-02.08
Q4 24/25: Refer to SRP.RA-02.08
Q3 24/25: Refer to SRP.RA-02.08
Q2 24/25: Refer to SRP.RA-02.08
Q1 24/25: As Q4 23/24.
Chief *Executive;
Chief Finance
Officer;
30-Jun-2028 20%
SRP.RA
.02.06 Capital Plan prioritisation
Q1 25/26: Work evaluating information flowing from building condition surveys
continues with a view to presenting a draft building Asset Management Plan to
Council in October.
Q4 24/25: Council in February received an update on Capital Plan Prioritisation
work and made a decision on an updated Learning Estate Strategy. The extent
and affordability of work flowing from building condition surveys is being
assessed and will be concluded and reported to Elected Members early in
2025/26.
Q3 24/25: Work continues on Capital Plan Prioritisation
Q2 24/25: Work continues on Capital Plan prioritisation
Q1 24/25: Work continues on Capital Plan prioritisation
Head of
*Development;
Executive Director
*Place; Chief
Finance Officer;
31-Oct-2024 0%
Page 102 of 128

Page 103

7
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
SRP.RR.02 The Long-Term Change Programme
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.02
Risk cause:
A MTFS that does not address the
projected budget shortfall or contextual
factors relating to the Midlothian area.
Reduced resources
Leadership fit for the future.
Lack of clarity or clear compelling vision
for the future
Delay or shortfall in securing savings
Lack of or not securing transformational
change in service provision 
Risk event:
Delayed progress in applying various
strands of the Change Programme
including Delivering Excellence
Framework
Slow benefits realisation and budget
savings. Cuts in service provision rather
than service transformation 
Risk effect:
Objectives of change not actually met or
progress too slow. Adverse impact on
services Slow or delayed
proposals/savings arising from service
redesign. Potentially further eroding
reserves or requiring short term service
reductions which impact on Council's
ability to deliver against its priorities. Staff
morale negatively affected, Government
step-in short term savings instead of
transformation 
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
1. Development of Strategic Plan, Transformation Blueprint and MTFS
projections which come together to provide a framework to effect change
and to move the Council to a position of financial sustainability.
2. Leadership from all Elected Members, Executive Team and Senior
Leadership Group.
3. Appropriate governance in place across the BTB Strategic Boards
4. Resilience planning.
5. Capacity to deliver change.
6. Dedicating capacity to understand impact of NCS Bill, but limited
details mean this is challenging and many unanswered questions (refer
to  specific risk for NCS Billl).
7. High level priority is given to blueprint work.   
5 5
Page 103 of 128

Page 104

8
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.02.03
Develop Medium Term Financial Strategy
with greater oversight, clearer
responsibility and accountability.
Q1 24/25: Refer to SPR.RA-02.03
Q4 24/25: Refer to SPR.RA-02.03
Q3 24/25: Refer to SPR.RA-02.03
Q2 24/25: Refer to SPR.RA-02.03
Q1 24/25: An update on the MTFS was presented to Council in June 2024. This
identifies immediate actions required, in addition to those in the Transformation
Blueprint, to bridge the gap between recurring expenditure and recurring
income and to allow the setting of a balanced budget for 2025/26.
Chief *Executive;
Chief Finance
Officer;
30-June-2024 100%
SRP.RA
.02.04 Transformation Blueprint 2023 to 2028
Q1 25/26: Refer to SRP.RA-02.08
Q4 24/25: Refer to SRP.RA-02.08
Q3 24/25: Refer to SRP.RA-02.08
Q2 24/25: Refer to SRP.RA-02.08
Q1 24/25: As Q4 23/24.
Chief *Executive;
Chief Finance
Officer;
30-Jun-2028 20%
SRP.RR.03 Legal and Regulatory Compliance
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.03
Risk cause
Current or new legislation applying to
Midlothian Council.
Lack of capacity to resource statutory
obligations around GDPR, data protection,
records management, information
requests and statutory regulatory
functions. 
Risk event
Head of *Adult
and Social Care;
Legal *and
Governance
Manager; Chief
Operating Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
1. Executive Directors, Chief Officer(s) and Head(s) of Service
responsible for identifying applicable legislation and propose Council or
Service responses to CMT and Cabinet/Council as required.
2. Annual Assurance Statement.
3. Internal Audit testing of internal controls as part of risk-based audit
plan.
4. External Audit.
5. Range of external inspection.
6. BTSG oversight of new legislation
7. Central repository of applicable legislation. 
5 5
Page 104 of 128

Page 105

9
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Council and or Services not identifying all
applicable legislation impacting Council
activities and Service requirements. 
Risk effect
Council failing to meet its statutory
obligations resulting in a potential negative
impact for service users or employees.
Reputational impact of not meeting
statutory obligations. 
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.03.02 Rights of the Child Bill
Q1 24/25: Bill now adopted. Policy to be presented to Council May/June 2024.
Council wide group established and developing a plan that ensures we are all
aware and adhering to UNCRC.
Executive Director
– People 31-Dec-2024 0%
SRP.RA
.03.03 National Care Service
Q3 24/25: Scottish Government announced in January 2025 that they will not
be proceeding with the National Care Service.
Q2 24/25: As of 14 November 2024, the Scottish Government has paused
legislation on the creation of a NCS.
Chief *Executive; 31-Dec-2024 0%
SRP.RA
.03.05
Review of Standing Orders, Scheme of
Administration and Scheme of Delegation
Q4 24/25: Standing Orders and Scheme of Administration updated and
approved at Feb 2025 Council
Legal &
Governance
Manager;
Executive Director
*Place; Chief
Officer Corporate
Solutions;
28 Feb 2027 40%
SRP.RA
.03.07
Review of policy and creation of a policy
register
Q1 25/26: Engagement sessions taking place with each Directorate to review
policy register
Q4 24/25: Policy list presented to CMT May 2025 for CMT to review and
feedback.
Chief Officer
Corporate
Solutions
31-Dec-2025 40%
NEW Compliance with statutory duties
Q1 25/26: Progress Update Review for Records Management Plan submitted
and approved by National Records of Scotland and published online.
Compliance Team establishment ongoing. Strategic Information Governance
Group established and Action Plan in development.
Q4 24/25 : Resourcing proposal for a new Compliance Team being agreed  by
Corporate Management Team. Funding to be identified through existing
Chief Officer
Corporate
Solutions, Legal
and Governance
Manager
31-Dec-2025 10%
Page 105 of 128

Page 106

10
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Corporate Solutions budgets with implementation on a phased basis.  Now
proceeding to final stages of Managing Change process.
Q1 24/25: Records Management Officer in post and reviewing the Records
Management Plan, Corporate Retention Policy and Schedule and supporting the
development of retention framework for M365 rollout. 
SRP.RR.13 Climate Change
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.13
Risk cause
Council Services not adequately engaged,
resourced or directed to fulfil the
requirements of the Climate Change Act. 
Risk event
Council Services not responding to the
Climate Change Act with sufficient pace. 
Risk effect Council failing to meet its
obligation under the Climate Change
(Scotland) Act 2009 and incurring the
associated reputational damage. 
Chief *Executive;
Executive
Directors and
Chief Officers.
1. Statutory requirement to report on compliance with climate change
duties.
2. Council Carbon Management Plan
3. Approval of a Corporate Climate Change Strategy and action plan
4. CPP Board for Climate Change to bring strategic focus and oversight
of plans and progress.
5. Resilience Seminars 
5 5
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.13.04
Delivery of the BTB Board Carbon Neutral
by 2030
Q1 25/26: Work continues on revised Climate Action Plan/Strategy.
Q3 24/25: Council approved realignment of Net Zero target from 2030 to
2045.
Q2 24/25: Member Briefing delivered.
Q1 24/25: Member Briefing on Climate Action Plan being prepared for
presentation in Q2/3.
Planning,
Sustainable
Growth and
Investment
*Manager; Chief
Officer *Place;
31-Mar-2030 0%
SRP.RA
.13.05
Development of the Strategic Plan 2023-
27
Q3 24/25:  Council approved realignment of Net Zero target from 2030 to
2045.  Climate Action Strategy refresh to follow.
Planning,
Sustainable
Growth and
31-Mar-2025 90%
Page 106 of 128

Page 107

11
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Investment
*Manager; Chief
Officer *Place;
SRP.RR.09 Emergency Planning and Business Continuity Management
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.09
Risk cause
The Council not preparing or timeously
reviewing Emergency Plans and testing
arrangements to respond to Civil
Contingencies Incidents. 
Risk event
There are a wide range of potential events
the Council may be expected to respond
to e.g., Severe weather incident,
Pandemic, Utility disruption etc. 
Risk effect
Loss or degration of service.
Loss or damage to buildings.
Not adequately able to recover from the
losses, (e.g. staff, major facility such as
secondary school, main offices or
computer systems etc).
Not able to respond competently to a
major emergency in the community.
Unnecessary loss of life, livelihoods and
property due to inadequacy or response.
Reputational consequences and damage.
Prosecution through non-compliance with
the Civil Contingencies Act.
Fatal Accident Inquiries.
Costs. 
Head of *Adult
and Social Care;
Head of
*Development;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
David Robertson;
Chief Officer
Young People
and Partnerships
1. Civil Contingencies Risk Register used to highlight key risks and
record response,
- Council’s plans developed and maintained in response to identified
risks,
- Risk and Resilience Group support development, peer review and roll
out of plans.
2. Establishment based incident response plans in place and maintained
locally.
3. Emergency response plan setting out general approach to respond to
a major emergency in-line with key partner organisations.
4. As part of the Council’s Emergency response the importance of
recording decisions made and information available at the time is
highlighted as this would be scrutinised in the event of an FAI.
05 – Care for People Group: Afghan, Ukrainian and UASC support
programmes 
4 5
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.09.02 Development of Emergency Plans
Q1 25/26: As Q4 24/25. The service review for the Health, Safety and
Resilience Team Service, which includes Contingency Planning, requires to
progress to implementation stage.
Chief Officer
*Place; Senior
Manager
31 March 2026 25%
Page 107 of 128

Page 108

12
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Plans and Procedures updated. 
Business Continuity (BC) Planning inclusive of cyber security. BCP
template provided for service completion.
CONTEST/Prevent: Mandatory Prevent e-learning module updated to link
direct to Home Office Prevent product.  This went live in April 2025.
Action Counters Terrorism (ACT) Awareness e-learning added to the LearnPro
course list for corporate staff in April 2025  
Ongoing monitoring and circulation of information and liaison with
services regarding the Public Switched Telephone Network switch-off (in
conjunction with Digital Services) and the Radio Teleswitch Service switch-off,
linking with the Third Sector Interface and Neighbourhood Watch Scotland (the
latter having been contracted by BT and E-on to deliver face to face public
information sessions on these topics). 
Training and Exercising: preparation for national pandemic exercise
scheduled for Autumn 2025, involving Scottish resilience partnerships.
Participation in the Torness annual call-out exercise. 
Three members of staff (from both Directorates and HSCP) attended Crisis
Management training offered by Scottish Government during this quarter.
Participated in familiarisation training for the Resilience Direct platform as well
as promulgating opportunities to all Midlothian RD user account holders.
Protective
Services; David
Robertson
SRP.RA
.09.03 Business Continuity Software System
Q1 25/26: As Q4 24/25
Q4 24/25: Consideration currently being given to the option of using
Teams/Sharepoint as a solution/replacement for existing software, the contract
for which ends in Dec 2025.
Q3 24/25: Any new system requires resource to roll out across the
organisation.
Q1 24/25: The Health, Safety & Resilience Service review is progressing and
has identified staffing shortages to meet obligations.
Chief Officer
*Place; Senior
Manager
Protective
Services; David
Robertson
31-Dec-2025 25%
Page 108 of 128

Page 109

13
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
SRP.RR.16 Growing Council
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.16
Risk cause
Population growth in Midlothian over the
next 10 to 15 years will see Midlothian
become the fastest growing Council in
Scotland.
Between 2014 and 2039, ages 0-15yrs,
population is projected to increase by 20%
and for ages 75+ population projected to
increase by 100%. 
Risk event
Failure to resource and plan for these
rises will significantly impact the Councils
ability to fulfil its statutory obligations in
relation to these groups. 
Risk effect Inadequate capacity within the
school estate to cope with the projected
increase in pupil numbers. In sufficient
provision to support an aging population
placing costly inefficiencies on other parts
of the care sector. General population
increase placing additional demand on
infrastructure including GP services.
Increased pressure on infrastructure,
services e.g., waste collection and growth
of road network as new development
roads are adopted.
Head of *Adult
and Social Care;
Chief *Executive;
Executive
Director *Place;
Fiona
*Robertson;
Chief Officer
Young People
and Partnerships
1. Local development plan and supplementary guidance on developer
contributions.
2. Services planning future service provision on the basis of anticipated
service demands
3. The change programme
4. Learning Estate Strategy
5. Capital Plan Prioritisation
6. Strategic Housing Investment Strategy
7. Rent Review Strategy
8. Joint needs assessment used to develop - IJB Strategic Plan
9. Capital Plan and Asset Management Board will scrutinise and
challenge slippage on capital programmes recognising that slippage can
have an adverse impact on financial sustainability and also the delivery
on assets required to support capital growth. 10. City Deal provides the
opportunity to support inclusive growth. 
4 4
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.02.06 Capital Plan prioritisation
Q1 25/26: Work evaluating information flowing from building condition surveys
continues with a view to presenting a draft building Asset Management Plan to
Council in October.
Q4 24/25: Council in February received an update on Capital Plan Prioritisation
work and made a decision on an updated Learning Estate Strategy. The extent
and affordability of work flowing from building condition surveys is being
Head of
*Development;
Executive Director
*Place; Chief
Finance Officer;
31-Oct-2024 75%
Page 109 of 128

Page 110

14
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
assessed and will be concluded and reported to Elected Members early in
2025/26.
Q3 24/25: Work continues on Capital Plan prioritisation.
Q2 24/25: Work continues on Capital Plan prioritisation.
Q1 24/25: Work continues on Capital Plan prioritisation.
SRP.RR.14.1 Scottish Child Abuse Inquiry
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.14.1
Risk Cause: Midlothian Council and its
legacy organisations, predating the
creation of Midlothian Council in 1996,
have been involved in the provision of
care of children going back to living
memory. During this time there is the
likelihood that the care children received
fell below standards of care now in place.
There is the further potential that some
people in the care of Midlothian Council
and its legacy organisations were subject
to abuse by those who were employed to
care for them. 
Risk Event: The Scottish Government
began an Inquiry into cases of Child
Abuse occurring prior to 17 December
2014, the intention of this enquiry is to
identify historic case of abuse which have
to date gone unreported.
The most recent Section 21 notice around
the Foster Care Case Study is a
significant piece of work. The request for
information from 1930 to date is very
challenging given the volume of files that
require to be read and analysed. 
Risk Effect: If the inquiry finds historic
cases of abuse in Midlothian this could
damage the reputation of the Council and
could place doubt in the eyes of the public
Chief *Executive;
Chief *Social
Work Officer
The Council initially set up an Inquiry Project Team, however this is no
longer required as we have an experienced worker overseeing all
requests for the Scottish Child Abuse Inquiry Team.
Work is ongoing and we have the additional tasks of supporting and
responding to enquiries from the redress team.
The Inquiry Team have established a Project Plan covering:
1. Residential establishments, List D Schools and Foster Carers:
identifying Children’s homes, Foster Carers and any List D Schools in
Midlothian over the last 100 years and researching historic records.
2. Record Audit: reviewing the Council’s existing paper and electronic
recordkeeping systems to identify relevant records and map them to
residential establishments. This also includes, where possible, noting the
Council’s historic recordkeeping policies, such as retention schedules.
3. Cataloguing/Indexing: checking and updating existing recordkeeping
systems for accuracy and consistency, enabling effective information
retrieval when requested by the Inquiry.
The Project Team have established a Project Plan covering:
4. Ascertaining the succession and insurance position in relation to
potential historic child abuse claims.
5. Ascertaining and agreeing Midlothian Council’s legal position/
approach in dealing with the potential historic child abuse claims.
6. Identifying the need for guidance, protocol, templates etc. should/if any
claims be made against the council.
7. Consideration to identifying if additional staffing will be required as
expected deluge of FOI’s SARs in 2018 from solicitors of potential
claimants.
4 4
Page 110 of 128

Page 111

15
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
as to the safety of these currently in care.
There is significant scope for a substantial
financial impact arising from claims of
historic abuse. Some existing employees
may be affected by the inquiry and
subsequent claims of abuse.
We have requested an extension for Parts
B, C & D of the last Section 21 to April
2020, which has been granted. To date
there has been no evidence from the
extensive file read to suggest there has
been systemic abuse within our foster
care system. 
8. Project team is in place with project plan with a range of identified
actions which are being progressed. Monthly meetings to progress
project plan. 9. The SCAI Social Worker is very competent and
experienced in this area of work and provides quarterly updates on their
findings from the file read. This is a real strength within this area of work.
The CSWO and Principal Solicitor meet regularly with the social worker
to discuss findings from the file read.  
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.14.03
Foster Care and Residential Care File
Review
Q3 24/25: Phase 10 is now in progress with investigation of residential care
homes run by local authorities. We will comply with all s21 requests.
Childrens Services
Management
Team; Chief
*Social Work
Officer;  Chief
Officer Young
People and
Partnerships
31-Mar-2024 100%
SRP.RR.19 Health & Safety/Fire Safety
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.19
Risk cause
Failing to identify and rectify non-
compliance with Health and Safety
regulations. 
Risk event
Reactive rather than pro-active
organisational health and safety culture.
Employees/Managers not adequately
trained.
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
1. Health Safety and Wellbeing Strategy & Service Plan.
2. Suite of Health and Safety Management Arrangements developed
setting out council response to statutory obligations.
3. Comprehensive range of Health & Safety Management & Assessment
based development opportunities for line managers.
4. Use of Health & Safety Management Information System (SPHERA) to
enhance information transfer and organisational efficiency.
5. Comprehensive training programme in place to support those with
responsibility for managing health and safety.
6. Use of comprehensive audit programme to confirm the application of
agreed management Arrangements and Council Policy.
4 4
Page 111 of 128

Page 112

16
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Employees required to undertake tasks in
which they are not trained or competent.
Statutorily driven health and safety
protective arrangements for service users
and employees not implemented correctly.
Non-compliance with policy and
procedure.
Health and safety team inadequately
resourced to promote or implement pro-
active measures or train managers/staff.  
Audits and inspections to being
undertaken to confirm adherence to policy
and legislative requirements. 
Risk effect
Serious injury or ill health impact on
employees and/or service users.
Negative impact on outcomes for
customers and service users.
Service users and employees exposed to
hazards where statutory requirements
exist.
Statutory health and safety - duty of care
to services users and employees not met.
Criminal prosecution of the Corporate
body and or individuals through Corporate
Homicide (Corporate Manslaughter).
Significant financial penalties from
Criminal Prosecution.
Reputational damage.
Significant costs incurred to Council due to
insurance claims, loss of services, plant or
buildings. 
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
David Robertson;
Chief Officer
Young People
and Partnerships
7. Estate Safety & Maintenance Groups for prioritising any matters
requiring escalation.
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
NEW
Health, Safety & Resilience Service
Review
Q1 25/26: As Q4 24/25.
Q4 24/25: Position unchanged from Q3 The service review for the Health,
Safety and Resilience Team Service requires to progress to implementation
stage.
Q3 24/25: Service review completed, pending action.
Chief Officer
*Place; Senior
Manager
Protective
Services; David
Robertson
31/10/2025 0%
Page 112 of 128

Page 113

17
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Q2 24/25: Service Review progressing and developing (completed Sept 2024).
Q1 24/25: The Health, Safety & Resilience Service review is progressing and
has identified staffing shortages to meet obligations. The report will be
submitted in Q2 for consideration.
SRP.RA
.19.01
Delivery of Health, Safety and Wellbeing
Service Plan
Q1 25/26: As Q4 24/25.
Q4 24/25: Position unchanged from Q2. Awaiting outcome before service plan
for 25/26 can be fully drafted.
Q3 24/25: Position unchanged from Q2.
Q2 24/25: Awaiting outcome of service review before reviewing service plan.
Q1 24/25: Implementation of the Protective Services Health, Safety &
Resilience Service Plan continues. The plan will be reviewed at conclusion of the
service review.
Chief Officer
*Place; Senior
Manager
Protective
Services; David
Robertson
31-Mar-2025 0%
SRP.RA
.19.07
H&S fire safety audit across all Council
estate
Q1 25/26: Fire Risk Assessment work plan started – priorities being premises
with sleeping risks, schools, depots, main offices, leisure centres and libraries.
Q4 24/25: New Fire Safety Adviser now recruited. To begin work on 28th April
2025.
Q3 24/25: Departure of Fire Safety Adviser in Nov 2024 has adversely affected
implementation of audit programme and reactive responses. Another member of
staff is temporarily dealing with priority work until a replacement is recruited.  
Q2 25/25: As Q1 24/25.
Q1 24/25: Fire Risk Assessments/Audits progressing. A number of Zurich
Insurance audits have also taken place.
Chief Officer
*Place; Senior
Manager
Protective
Services; David
Robertson
31-Mar-2026 20%
SRP.RR.08 Asset Management – Buildings, Vehicles,  Roads and Digital Assets/Networks
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.08 Risk cause
Head of *Adult
and Social Care;
1. There is provision in place within the capital plan for investment in the
asset base. 3 5
Page 113 of 128

Page 114

18
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Many of the assets the Council own by
their nature are in a position of ongoing
deterioration through their normal use,
e.g., roads - normal wear and tear,
streetlights and vehicles & buildings used
to deliver services. 
Risk event
Many assets will deteriorate under normal
conditions although buildings, roads and
streetlights as an example can be
damaged during more extreme weather
events or as a result of a lack of
maintenance. 
Risk effect
In the case of Roads Services there is a
real risk of increased potholes and
insurance claims, reduced skid resistance
leading to higher accident potential and
building up of higher costs in the future. In
respect of vehicles, increased
breakdowns, service failures, greater
maintenance inevitable, higher short-term
hire costs. In terms of property, health and
safety issues arise, failure to meet current
standards and higher running costs. There
is also the risk of two-tier accommodation,
some high quality, some low. 
Head of
*Development;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
2. Asset register
3. Condition Survey
4. Understanding of future asset needs
5. Asset Strategy:
. Roads
. Land
. Fleet
. Digital Service Network
. Digital Service hardware
6. Capital programme - investment in estate.
7. Ongoing monitoring of properties by: Maintenance Surveyors,
Facilities Management and Property Users.
8. Established Capital Plan and Asset Management Board and dedicated
Asset Management Board
9. Establishment of 7 thematic Estate Safety and Management Groups
chaired by Chief Officer Place 10. Building Accessibility Strategy 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.08.02
Plan for appropriate investment in capital
works and remedial maintenance over the
lifespan of each property asset.
Q1 25/26: Asset management plan for Property & Estate drafted. Due to be
finalised and issued to Council in Q2. Updated governance for asset
management included. Asset management plans for Fleet also approved at
Council.
Q3 24/25:  Condition Surveys of Learning Estate (excl PPP) has concluded.  Q4
presentation to Elected Members.  Backlog repairs continue.
Q1 24/25: Condition Surveys continue, with Learning Estate (excl PPP)
expected to be concluded by end December 2024 to inform capital investment
proposal.
Chief Officer
*Place; 30-Apr-2025 33%
Page 114 of 128

Page 115

19
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
SRP.RA
.08.05 Learning Estate Strategy
Q1 25/26 Learning Estate Strategy
Is currently being implemented with the focus on the delivery of the LEIP funded
projects of Mayfield, Beeslack and Penicuik. Shawfair Campus project ahs been
approved and design being developed.
Learning Estate
Programme
Manager
30-March 2026 50%
SRP.RA
.08.06
Asset Management systems
Q1 25/26: Asset management plan for Property & Estate drafted. Due to be
finalised and issued to Council in Q2. Updated governance for asset
management included. Asset management plans for Fleet also approved at
Council. Also approved at Council.
Q1 24/25: Identified for implementation through Transformation Blueprint and
The Change Programme. 
Head of
*Development; 31-Mar-2025 50%
SRP.RR.22 Cost of Living Crisis
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.22
Risk cause
The UK is currently facing an
unprecedented storm of increasing prices,
bills and tax. The 40-year high inflation
rate of 9% is the main driver of the cost-of-
living crisis which has outstripped wage
and benefit increases.
Risk event
Rapid ongoing rise of energy prices as
well as food and drink prices. 
Risk effect The impact on households is
already being noted with 87% of adults in
the UK reported an increase in their cost
of living in April 2022 (Office for National
Statistics; Francis-Devine et al, 2022). The
price rises will impact low-income
households the hardest as a larger
proportion of their bills are on energy and
food. The Resolution Foundation
estimates an extra 1.3 million people will
fall into absolute poverty in 2023, including
500,000 children.
Chief *Executive;
Director *Health
and Social Care;
Executive
Director *Place
1. Council Cost of Living Task Force to oversee the Council’s response
to the crisis
2. Allocation of LACER funding to support those most affected
3. Strategic Evaluation Partner appointed to create poverty profile
4. Community Planning Partnership has established a Midlothian
Strategic Poverty Prevention Group co-chaired by Council Leader and
Director of Public Health
5. New Child Poverty chair and lead appointed (Executive Director
Children, Young People and Partnerships)
6. Child Poverty self-evaluation underway with Improvement Service 
3 5
Page 115 of 128

Page 116

20
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.22.1 Cost of Living Task Force Q1 23/24: Meetings continuing.  Chief *Executive; 31-Mar-2024 100%
SRP.RR.21 Cyber Security
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.21
Risk Cause
Malicious attempts to damage, disrupt or
gain unauthorised access to Council
computer systems, networks or devices. 
Risk Event
The cyber threat is severe and advancing
quickly.The Council is at significant risk of
cyber-attack from Ransomware Phishing
Emails, Advanced Persistent Threats
(APT) and Distributed Denial of Service
Attacks (DDOS) attacks. Hacking and
Social Engineering.
Risk Effect
Access to Council systems by cyber
criminals and foreign intelligence agencies
for financial, commercial or information
gathering reasons. This could lead to
significant financial losses, data
compromise and subsequent regulatory
sanction if our technical and organisational
measures are deemed insufficient. Severe
business disruption including the almost
total loss of critical IT systems and
networks leading to significant service
delivery challenges. 
Head of *Adult
and Social Care;
Cyber Security
Information
Governance and
*Compliance
Manager; Head
of *Development;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
David Robertson;
Chief Officer
Young People
and Partnerships
1. Implementation of and compliance with the Scottish Government
Cyber Resiliency Public Sector Action Plan
2. Cyber Essentials Plus Certification
3. Public Sector Network Certification
4. Regular Audits and Inspections
5. Appropriate technical and organisational measures deployed to reduce
the likelihood and impact of an attack
6. Having adequate skills and knowledge in the organisation
7. Implementing Scottish Government Cyber Security Action Plan
8. Adoption of the NCSC (National Cyber Security Centre) Active Cyber
Defence programme 
9. Technology upgrades
10. Incident Response plans and exercises
3 5
Page 116 of 128

Page 117

21
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.21.1
Appropriate Technical and Organisational
Measures
Q4 24/25
1. Delivered a week-long cyber security awareness campaign (24
February – 2 March), using email, posters, intranet news, social media,
and updates from the Chief Executive 
2. Secured a £7,000 grant from the Scottish Government to support cyber
security training for Digital Services staff 
3. Provided support for the 2025 Audit Scotland audit, focusing on key
financial systems and cyber security controls 
4. Successfully defended the organisation against multiple cyber attacks 
5. Provided security oversight for the onboarding of new applications and
technical services 
Q3 24/25 - Action/mitigation includes: -
1. Quorum cyber security tabletop exercise completed
2. Successfully defended the organisation from several cyber incidents
3. Provided significant Information Governance and Security advice for
the continued deployment of M365 and Google Workspace
4. Audit on business continuity
5. Ran successful phishing exercises
Q1 24/25 - Action/mitigation includes: -
1. Achieved Cyber Essentials Plus Certification
2. Achieved PSN Certification from the Cabinet Office
3. Organised and facilitated a leadership forum exercise on cyber
resilience
4. Successfully responded to 15 significant cyber security events
5. Provided significant Information Governance and Security advice for
the continued deployment of M365 and Google Workspace
Cyber Security
Information
Governance and
*Compliance
Manager; Chief
*Digital Officer;
31-Mar-2025 75%
SRP.RR.23 Counter Terrorism – Compliance with Legislation
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.RR.2
3
Risk cause
Current or new legislation applying to Midlothian Council.
Lack of capacity to resource the statutory obligations.
Chief Officer
Children’s
Services,
Partnerships
1. There is a CONTEST Lead and Depute (Single Point of
Contact (SPOC)) in place.  These individuals are also the
nominated Prevent SPOC and Depute SPOC. 3 4
Page 117 of 128

Page 118

22
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Risk event
Council and/or Services not identifying all applicable
actions.
The CONTEST and Prevent action plans fall short of
what is required
Risk effect
Council failing to meet its statutory duties, potentially
resulting in a negative impact on the safety of employees,
service users and visitors to Council facilities.
Reputational impact of not meeting statutory duties.
and
Communities
2. There are designated, trained officers available to Chair
Prevent related case conferences (Prevent Multi-Agency
Panel).
3. There is a Midlothian CONTEST Group chaired by the Chief
Officer Children’s Services, Partnerships and Communities.
Membership includes representatives from services in both
Council Directorates and the Midlothian Health and Social
Care Partnership plus key external partners.  Terms of
Reference are in place.
4. Executive Directors, Chief Officers and Heads of Service are
responsible for ensuring that their services comply with
allocated actions and identifying any concerns and additional
actins required.
5. An annual report on CONTEST activities is submitted to the
Corporate Management Team.
6. Prevent assurance Statements are required by the Home
Office and Scottish Government every two years.
7. Relevant information and updates received from external
partners and organisations are disseminated to CONTEST
Group members and others as appropriate.
8. E-learning CONTEST related modules, including Prevent
products are Mandatory.  In-person and written briefings are
available to other staff groups who do not have access to e-
learning or for whom the full briefing is not appropriate.
Risk Code Related Action Related action latest note Managed By Due Date Status
SRP.RA.23.
01
Review and implement the recommendations from the
Prevent Assurance 2025 process.
Q4 24/25:  The Home Office is due to provide feedback on the Midlothian Council
Prevent Assurance 2025 submission.  Communication during the process indicated
that guidance would be given in respect of at least one of the assessment areas.
Chief Officer
Children’s
Services,
Partnerships
and
Communities
June 2026 0%
SRP.RA.23.
02
Terrorism (Protection of Premises) Act 2025:  Implement
the requirements of the Act as they become clear through
Government guidance.
Q4 24/25:  New legislation.  The Terrorism (Protection of Premises) Act 2025 (also
known as Martyn’s law) received Royal Assent on Thursday 3 April.  The Government
intends for there to be an implementation period of at least 24 months before the Act
comes into force. This period will enable those responsible for premises and events to
have sufficient time to understand their new obligations, and to plan and prepare
accordingly.
Whilst those that fall within scope of the Act may wish to consider the requirements,
there is no requirement to comply with them until the legislation comes into force. The
Home Office will publish statutory guidance during the 24-month implementation
period. 
Chief Officer
Children’s
Services,
Partnerships
and
Communities
2027 0%
Page 118 of 128

Page 119

23
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
SRP.RR.04 Employee performance
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.04
Risk cause
Employees not suitably trained/developed
for the roles required of them.
Limited availability of qualified
practitioners in certain sectors.
Change program not informed by all key
stakeholders.
Ageing work force.
Employees unclear on expected
behaviours.
Employees constrained to innovate as a
result of management practice.
Employee productivity rate below the
required level because of ineffective use
of the People Policies particularly
Maximising Attendance.
Salaries in some functional areas lower
compared to other LA’s resulting in
recruitment issues particularly with trying
to recruit experienced staff.
Risk event
Employees not engaged/consulted as part
of organisational transformation.
Experienced employees leaving the
organisation.
Inability to recruit suitably qualified /
trained staff to fill vacancies negatively
impacting on remaining workforce.
Unacceptable behaviours demonstrated
by employees.
Stated organisational culture not
consistently reinforced by managers.
Poor employee performance will stifle
transformational change. 
Risk effect
Difficulties recruiting the right staff.
Challenges retaining quality staff.
Low skill levels.
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
HR Strategic
Lead; Chief
Officer Young
People and
Partnerships
Over-riding risk control measure = Focus on having the right people,
here, healthy, performing, behaving and well led via effective utilisation of
the workforce strategy and accompanying action plan.
Approval of the Council’s Workforce Strategy 2024-2034 which
focuses on the thematic areas below:
Attendance / Wellbeing
1. Continuing implementation of the Wellness@Midlothian agenda.
2. Creation of an Employee Health and Wellbeing Strategy and
supporting policy.
3. Maintaining the Healthy Working Lives Gold Award.
4. Proactive use of Occupational Health, Midlothian Physiotherapy,
Employee Assistance Programme and the Workplace Chaplaincy
Service.
5. Change of EAP supplier to ensure provision of best possible service.
6. Development of progressive People Policies.
7. Roll-out of mental health training for staff and managers. 
Performance
1. Service-level workforce plans.
2. Structured, robust, well established ‘Making Performance Matter’
Framework where expected standards of behaviour and Council values
are re-enforced.
3. Continued re-enforcement of all People Policies involving various
communication methods.
4. Development of a suite of management information to ensure Service
Managers are informed e.g., turnover, absence levels/reasons etc. 
Organisational Change
1. Policy for Organisational Change includes strong emphasis on early
engagement of employees.
2. Redeployment Procedure to ensure maximum chance of successful
redeployment. 
Conduct
1. Resolution Policy encourages early intervention of workplace issues.
2. Professional standards and values build into the induction process and
management development programme. 
3 4
Page 119 of 128

Page 120

24
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Low morale, especially during change.
High absence rates, loss of experience in
service areas.
‘A Great Place to Grow’ our values
including respect, collaboration, pride and
ownership not realised, potentially
resulting in missing the opportunity to
capitalise on the abilities, experience and
ideas of team members. Poor employee
performance will Exacerbate the financial
challenge.
Communication
1. A range of initiatives to keep staff informed of change (Chief
Executive’s weekly email, Connect, All staff emails, tailored team
briefings etc. 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.02.04
Development and Delivery of the Council’s
Workforce Strategy 2024-34 including
analysis of future workforce requirements,
gap analysis and gap closing strategies,
and performance measures and target
setting.
Q1 25/26: Q1 25/26: Workforce Planning workshops completed with HR/OD
team. Next session with CMT scheduled in September then onwards to Council
Senior and Service Managers for full rollout.
Q4 24/25: Council approved the Workforce Strategy 2024-2034 in December
2024. Work progressing on the delivery of the first three years through an
agreed action plan. Acting HR Strategic Lead appointed. Two interim posts from
BTB funding are being progressed for Talent and Reward.
Q1 24/25: Workforce Strategy in development and expected to be presented to
December Council with Action Plan for approval. Audit Scotland external audit
on workforce and digital to be presented to Audit Committee September 2024.
Chief Officer
Corporate
Solutions
31 Dec 2027 25%
NEW
Recruitment challenges in Procurement
Service leading to contract management
pressures and backlog in procurement
exercises
Q1 25/26: Procurement Manager in place. Additional Procurement Assistant
resource (fixed term) onboarded August 2025. Category management
realignment agreed and handover in progress. Business partnering model to
commence in September 2025. Contract management framework drafted and in
review. Contract register updated quarterly and published online. Pipeline in
development for each category.
Q4 24/25: Procurement Manager appointed to start on 1 June 2025. Chief
Officer Corporate Solutions to implement an improvement plan and revised work
plan for the service and develop business case for appropriate resourcing.
Chief Officer
Corporate
Solutions 31 Dec 2025 10%
Page 120 of 128

Page 121

25
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
SRP.RR.07 Care at Home
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.07
Risk cause
Internal and External providers of Care at
Home services unable to meet service and
quality requirements as a result of a lack
of capacity. 
Risk event
Capacity of Community Support
outstripped by demand. 
Risk effect
There is a risk that patients will have their
discharge delayed because there is
insufficient community supports to enable
timely discharge leading to deterioration in
their health, beds being blocked and
elective operations being cancelled. 
Head of *Adult
and Social Care;
Director *Health
and Social Care
1. Care at Home winter assurance plan and business continuity plan
complete
2. Development of Care at Home Service Improvement action plan near
completion
3. External commissioning complete and ongoing contract monitoring in
place
4. External provider audits complete
5. Re-established Multi-Agency Quality in Care at Home quarterly review
meetings jointly with East Lothian
6. Weekly provider meetings in place
7. Additional locum team members and contracts with agency staff in
place
8. Daily discharge meeting with Multidisciplinary and Multi-agency team
planning to plan and coordinate discharge to ensure care at hone support
in place 
3 4
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.07.01
Independent review of adult and social
care
Q3 24/25: Scottish Government announced in January 2025 that they will not
be proceeding with the National Care Service.
Q2 24/25: The Scottish Government has initiated a pause on the development
of the NCS.
Head of *Adult
and Social Care;
Chief *Executive;
31-Jan-2024 100%
SRP.RR.10 Governance and Standards in Public Life
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.10
Risk cause
Code of conduct for Members and
employees’ actions falling short of
International Standards. 
Legal *and
Governance
Manager; Chief
*Executive; Chief
Officer *Place;
01 Annual Assurance Statement.
02 Standing Orders
03 Scheme of Administration
04 Scheme of Delegation
05 Elected Member Code of Conduct
2 4
Page 121 of 128

Page 122

26
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Risk event
Failure in openness, accountability, clarity.
Risk effect Service, partnerships and
project outcomes not achieved. Non-
compliance with conduct standards and
reduction in standards in public life. 
Executive
Director *Place;
Chief Officer
Corporate
Solutions
06 Induction programme for new members and ongoing learning and
development programme
07 Employee Code of Conduct 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.03.05
Review of Standing Orders, Scheme of
Administration and Scheme of Delegation
Q4 24/25: Standing Orders and Scheme of Administration updated and
approved at Feb 2025 Council.
Q1 24/25: Workplan presented and agreed by SOWG in April 2024. Some
changes to SOs and Scheme of Administration presented and approved by
Council in May 2024.
Legal *and
Governance
Manager; Chief
Officer Corporate
Solutions;
28 Feb 2027 20%
SRP.RA
.10.03
Review of the employee onboarding and
induction programme
Q1 25/26: Content for online induction now finalised – in design phase prior to
launch in Autumn. Next step is face to face induction programme.
Q4 24/25: Work ongoing to finalise the refreshed induction programme and
onboarding process
Chief Officer
Corporate
Solutions
31-Dec-2025 5%
SRP.RR.12 Internal Control Environment
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.12
Risk cause
Work procedures/process inadvertently
create the capacity for fraud and waste to
occur.
Internal Controls requiring more time,
effort or cost than the risk being managed.
Mangers failing to follow procedures and
keep systems updated with accurate
information. 
Risk event
Persons exploiting opportunities to commit
fraud.
Waste and errors
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
1. Services have been prompted to consider fraud and waste within
Service Risk Registers.
2. Risk Management Guide provides direction on the need to balance
time, effort and cost against benefit of risk controls.
3. Internal Audit examine internal control arrangements based largely on
the risk registers.
4. Corporate Fraud team in place who assist managers to undertake
fraud risk assessments in their areas (focused on priority areas) and
provide advice and guidance on fraud related matters. Active
participation in the National Fraud Initiative to investigate matches. 5.
Whistleblowing Policy and Counter Fraud Policy in place (subject to
review) with whistleblowing channels available to report concerns
(anonymously if required).
2 3
Page 122 of 128

Page 123

27
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Changing risk landscape associated with
remote working solutions. 
Risk effect
Waste and loss
Risks over managed with risk controls
costing more than the potential loss being
managed. Increased opportunity for fraud
or financial loss has direct impact on
management information. Has adverse
effect on service performance. 
Finance Officer;
Chief Officer
Young People
and Partnerships
6. Internal and external assurance. Annual Governance Statement which
involves obtaining assurance from Management over controls in their
Service.
7. E-learning for staff to complete mandatory training for fraud
awareness.
8. Regular updates to Audit committee on progress with
recommendations made by Internal Audit.
9. Remind staff to declare secondary employment/outside interests and
gifts & hospitality
10. Induction for all new employees (with service exceptions), including
legal, HR, procurement, health and safety. Control at entry to
organisation.
11. The Integrity Group continues to meet to improve the Council’s
resilience to fraud, corruption, theft and crime (including cybercrime),
maintaining proper risk management, governance and internal control
processes and systems to ensure probity in systems and operations, and
mitigation of risks, including the prevention, detection and resolution of
fraud and irregularities. Management is also responsible for checking that
the arrangements and controls are operating effectively and obtaining
assurances from internal compliance, risk, inspection, quality, and control
functions. 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.12.04
Review of Serious Organised Crime
(SOC) group
Q3 24/25: Draft Strategy devised.  Regulatory safeguards/actions progressing
through Licensing.
Q1 24/25: Initial meeting with Police is planned to discuss strategy.
Chief Officer
*Place; Health,
Safety &
Resilience
Manager
31-Mar-2025 50%
SRP.RR.11 Corporate Policies and Strategies
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.R
R.11
Risk cause
Policies may not match the aspirations of
the Council's Strategic priorities or cultural
perspective. 
Risk event
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
1. Single Midlothian Plan providing overarching direction
2. Service plans aligned to Single Midlothian Plan.
3. Leadership team to ensure correct approaches are adopted to get the
right results.
4. Strategic housing investment plan, submitted to Scottish Government.
5. Capital Strategy
6. Integrated Joint Board (IJB) Plan
2 3
Page 123 of 128

Page 124

28
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Policies not monitored may become out of
date. Policies not reviewed to ensure
alignment with strategic priorities. 
Risk effect Policies not monitored could
result in non-compliance with legislation
Policies not aligned to strategic priorities
will inhibit rather than support
implementation of strategic priorities. 
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
Young People
and Partnerships
7. IJB Strategic needs assessment 8. Midlothian Local Development Plan
2017 – the Council’s corporate spatial strategy. 
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.RA
.02.04 Transformation Blueprint 2023 to 2028
Q1 25/26: Refer to SRP.RA-02.08
Q4 24/25: Refer to SRP.RA-02.08
Q3 24/25: Refer to SRP.RA-02.08
Q2 24/25: Refer to SRP.RA-02.08
Q1 24/25: Work on sprints continues with some reporting to BTSG in the run
up to June Council with the majority of others scheduled for August. BTB is now
meeting fortnightly to encourage and closely monitor progress. To support
monitoring of progress a dashboard has been developed and this is shared with
CMT and BTSG as a standing item.
Chief *Executive;
Chief Finance
Officer;
30-Jun-2028 20%
SRP.RA
.03.07
Review of policy and creation of a policy
register
Q1 25/26: See comments earlier in SRP.
Q4 24/25: Policy list presented to CMT May 2025 for CMT to review and
feedback
Chief Officer
Corporate
Solutions
31-Dec-2025 10%
SRP.RA
.11.05 Antisocial Behaviour Policy
Q1 24/25: Member Briefing on Housing and Antisocial Behaviour to be
prepared and presented during Q2, with report to Council to follow. Chief Officer
*Place; 31-Dec-2024 0%
Page 124 of 128

Page 125

29
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Strategic Opportunities
SRP.OP.08 Capital Projects - Housing
Risk
Code Risk Identification Managed by Risk Commentary Risk Evaluation
SRP.O
P.08
Cost of delivering Affordable Housing
Supply Programme has risen at faster rate
than available grant to Midlothian and
continued high build costs will affect ability
to deliver housing programme.
Policy requirement to deliver 25%
affordable on new housing sites under
significant pressure due to grant level not
growing with housebuilding rate. More
sites will be unable to delivery subsidised
homes for rent due to shortfall in grant.
Projects progressing, with Timeline,
Budget, Risk and Resource categorised
as parameters on a RAG status, with any
Red classifications identified and reported.
Executive
Director *Place;
Head of
Development
1. Edmonstone Road, Shawfair – Timeline, Budget and Risk impacted
with Stewart Milne entering administration.  However, site now amber
due to appointment of Dundas Building to finish site. Now on site.
2. Newtongrange Former Pool & Church Hall sites. Requirement to
deliver 3D modular units on site. V limited Scottish suppliers for 3D due
to Connect going into administration. VfM to be examined in tender report
in Q2.
Phase 5 housing programme has been reviewed to ensure affordability
within the Housing Revenue Account. Grant level now restored to
2023/24 level with core RPA £10.534m and additional grant uplift from
£40m of £1.062m, which is to be used for acquisitions to address
temporary accommodation pressures. However, high level of housing
delivery and restored grant insufficient to support all housing sites to
deliver subsidised 25% affordable homes.
Timeline Budget Risk Resource
A A A G
A A A G
SRP.OP.09 Capital Projects – Transport, Net Zero & Infrastructure
Risk
Code Risk Identification Managed by Risk Commentary Risk Evaluation
SRP.O
P.09
Cost of delivering enabling infrastructure
projects has risen, resulting in significant
funding gap emerging.
Expansion of scope by Transport Scotland
and restrictions on timing of ecology
surveys driving further cost and timing
risks.
Projects progressing, with Timeline,
Budget, Risk and Resource categorised as
parameters on a RAG status, with any
Red classifications identified and reported.
Executive
Director *Place;
Head of
Development
1. A701 Relief Road
2. A701 Sustainable Trasport Corridor
3. A701 Straiton Junction Improvements
For all highlighted projects, estimated cost significantly exceeds budget
available to deliver project.
For all highlighted projects, addressing requirement for investment in
A701 corridor in phases with prioritisation applied. Bush Loan Junction
progressing ahead of remaining programme fully funded by ESESCRD
funding.
Timeline Budget Risk Resource
R R R G
R R R G
R R R G
Page 125 of 128

Page 126

30
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
SRP.OP.10 Capital Projects – Children, Young People & Partnerships Estates Programme: Primary
Risk
Code Risk Identification Managed by Risk Commentary Risk Evaluation
SRP.O
P.10
Projects progressing, with Timeline,
Budget, Risk and Resource categorised
as parameters on a RAG status, with any
Red classifications identified and reported.
Executive
Director *Place;
Executive
Director CYPP;
Head of
Development
1. Mayfield/St Lukes PS New Build: Cost reduction exercise
complete,Contract signed, Site start on 30th June 2025, with school
expected to open February 2027.
2. Mauricewood PS Extension & Refurbishment: Rising roll and
catchment review requires investment in school to address capacity
and suitability. Limited budget available.  Funding insufficient as
some contributions were withdrawn for pay for costs of previous
extension. Paper to CPAMB to seek approval to provide 6
classrooms and a gym hall, developer contribution funded.
3. Bilston PS Extension: Rising roll and catchment review requires
investment in school to address capacity and suitability. Limited
budget available.  Design team appointed to develop investment in
school that aligns with budget available from Developer
Contributions. Design is currently being market tested to ensure
project stays within the budget envelope, developer contribution
funded, Construction anticipated to start Jan 2026
4. Relocation of Mount Esk Nursery / Hawthorden Extension: Rising
roll and catchment review requires investment in school to address
capacity and suitability. Limited budget available.  Design team
appointed to develop investment in school that aligns with budget
available from Developer Contributions. Stage 2 design and costs
complete. Work ongoing
Budget Risk Resource
A R A A
A R R A
A A A A
A A A A
SRP.OP.09 Capital Projects – Children, Young People & Partnerships Estates Programme: Secondary
Risk
Code Risk Identification Managed by Risk Commentary Risk Evaluation
SRP.O
P.09
Projects progressing, with Timeline,
Budget, Risk and Resource categorised
as parameters on a RAG status, with any
Red classifications identified and reported.
Executive
Director *Place;
Executive
Director CYPP;
Head of
Development
1. Beeslack HS Replacement: Site acquisition being progressed.
Planning consent now in place. Preferred contractor appointed
under two stage process. Cost reduction work due to start next
2. Shawfair All Through: Site acquisition complete. School location
fixed with design team. Remediation programme underway by
Shawfair LLP. Shawfair All Thorugh Campus budget approved at
Council. Project team appointments to forthcoming project board
3. Penicuik HS New Build: LEIP target for delivery is Dec 2026,
however programme for occupation is July 2027. Cost reports
tracking higher and risks identified in refurbishment works.  SFT
Timeline Budget Risk Resource
R A A G
R A A A
A A A G
Page 126 of 128

Page 127

31
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
advising if additional LEIP funding available to address abnormal
costs. Contractor, Morrison Construction appointed Jan’25. Decant
works complete, advance works being planned
SRP.OP.09 Capital Projects – Regeneration
Risk
Code Risk Identification Managed by Risk Commentary Risk Evaluation
SRP.O
P.10
Projects progressing, with Timeline,
Budget, Risk and Resource categorised
as parameters on a RAG status, with any
Red classifications identified and reported.
Executive
Director *Place;
Head of
Development
1. Vogrie Changing Places: issues with contractor overcame. Part of
wider Vogrie Renewal Strategy.
2. Destination Hillend: Alpine Coaster delivered with access and
parking infrastructure and Coaster now open. Project absorbed risk
and contingency.  Updated brief issued to SSM for high level site
planning and to brief Members in Q2.
3. Hopefield Industrial Estate: Updated financial model required. Cost
plan for upgrade to infrastructure being developed
4. Dalkeith Asset Rationalisation Programme: Decant of staff to
Fairfield House complete underway and planning application for
works to Midlothian House submitted . Contractor appointed
however project now overbudget and being rescoped.
Timeline Budget Risk Resource
R A R A
R R R A
R A A G
A R A G
SRP.OP.04 City Deal
Risk
Code Risk Identification Managed by Risk Control Measures Likelihood Impact Risk Evaluation
SRP.O
P.04
South East Scotland Region City Deal - a
bid for funding to Scottish and UK
Governments to accelerate economic
growth through investment in
infrastructure/ housing/ skills and
innovation. 200 Council Houses linked to
the City Deal.  
Head of *Adult
and Social Care;
Chief Operating
Officer
*Education; Chief
*Executive;
Director *Health
and Social Care;
Chief Officer
*Place; Executive
Director *Place;
Chief Officer
Corporate
Solutions; Chief
Finance Officer;
Chief Officer
1. Maintain strong Midlothian involvement through the City Deal
governance structure.
2. Midlothian City Deal Key Officer (Internal) Group.
3. Securing best arrangements for Midlothian through close liaison with
partners and conclusion of business cases. 
4 5
Page 127 of 128

Page 128

32
STRATEGIC RISK PROFILE, Q1 Apr-Jun 2025
Young People
and Partnerships
Related
Action
Code
Related Action Related action latest note Managed By Due Date Status
SRP.O
P.04.02
Realisation of outcomes of respective
workstreams Q1 24/25: Work continues on the relevant programmes.  Executive Director
*Place 31-Mar-2025 10%
Page 128 of 128