Page 1

Moray Integration Joint Board 
Thursday, 25 January 2024 
Council Chambers 
NOTICE IS HEREBY GIVEN that a Meeting of the Moray Integration Joint Board,
Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Thursday,
25 January 2024 at 09:30 to consider the business noted below. 
AGENDA 
1. Welcome and Apologies 
2. Declaration of Member's Interests 
3. Minutes of meeting of 30 November 2023 4 - 9
4. Action Log of 30 November 2023 10 - 10
5. Chief Officer Report 11 - 23
6. Strategic Review of Neuro-Rehabilitation Pathway 24 - 44
7. Membership of Board and Committees 45 - 49
8. Locality Planning Update 50 - 81
9. Lossiemouth Locality Health and Social Care
Provision Update
82 - 85
10. Carefirst Replacement 86 - 89
11. Reappointment of Chief Internal Auditor 90 - 92
12. Reappointment of Standards Officer and Depute
Standards Officer
93 - 95
Page 1

Page 2

13. Care for People Plan - Moray Arrangements 96 - 115
14. Reserves Policy - Review 116 - 123 
Committee Minutes for noting 
Minutes of meeting of Audit Performance and Risk on
31 August 2023
124 - 127 
Minutes of meeting of Clinical and Care Governance
on 31 August 2023
128 - 132 
15. Budget Update and Financial Recovery Plan [Para
6.2.1] 
Page 2

Page 3

MORAY INTEGRATION JOINT BOARD 
SEDERUNT 
Mr Dennis Robertson  (Chair)  
Councillor Tracy Colyer  (Vice-Chair)
Mr Derick Murray  (Voting Member)
Mr Sandy Riddell  (Voting Member)
Councillor Peter Bloomfield  (Voting Member)
Councillor Scott Lawrence  (Voting Member)
Councillor Ben Williams  (Voting Member)
Mr Adam Coldwells  (Ex-Officio)
Mr Roddy Burns  (Ex-Officio)  
Mr Ivan Augustus  (Non-Voting Member)
Mr Sean Coady  (Non-Voting Member)
Ms Jane Ewen  (Non-Voting Member)
Mr Graham Hilditch  (Non-Voting Member)
Ms Deirdre McIntyre  (Non-Voting Member)
Mr Simon Bokor-Ingram  (Non-Voting
Member)
Professor Duff Bruce  (Non-Voting Member)
Ms Sonya Duncan  (Non-Voting Member)
Dr Robert Lockhart  (Non-Voting Member)
Ms Deborah O'Shea  (Non-Voting Member)
Ms Elizabeth Robinson  (Non-Voting
Member)
Dr Malcolm Simmons  (Non-Voting Member)
Ms Tracy Stephen  (Non-Voting Member)
Mr Kevin Todd  (Non-Voting Member) 
Clerk Name: Caroline O'Connor
Clerk Telephone: 07779 999296
Clerk Email: committee.services@moray.gov.uk 
Page 3

Page 4

MINUTE OF MEETING OF THE MORAY INTEGRATION JOINT BOARD 
Thursday, 30 November 2023 
To be held remotely in various locations 
PRESENT 
Councillor Peter Bloomfield, Mr Simon Bokor-Ingram, Mr Sean Coady, Councillor
Tracy Colyer, Ms Sonya Duncan, Ms Jane Ewen, Mr Graham Hilditch, Councillor
Scott Lawrence, Dr Robert Lockhart, Mr Derick Murray, Ms Deborah O'Shea, Mr
Sandy Riddell, Mr Dennis Robertson, Ms Elizabeth Robinson, Dr Malcolm Simmons,
Ms Tracy Stephen, Councillor Ben Williams 
APOLOGIES 
Mr Ivan Augustus, Professor Duff Bruce, Mr Roddy Burns, Mr Stuart Falconer,
Professor Caroline Hiscox, Dr Paul Southworth, Mr Kevin Todd 
IN ATTENDANCE 
Director of Planning and Performance, Digital Health and Care Innovation Centre
(DHI) Scotland; Vaccination Planning Manager; Interim Integrated Service
Manager, Mental Health and Substance Misuse Services; Deirdre McIntyre, Staff
Representative, NHS Grampian; Democratic Services Manager and Caroline
O'Connor, Committee Services Officer. 
1.         Chair 
Due to technical difficulties, Mr Robertson asked Cllr Tracy Colyer as Vice Chair to
chair the meeting.  
2.         Welcome and Apologies 
The Board joined the Chair in welcoming Deirdre McIntyre, who was replacing Stuart
Falconer as the NHS Staff Representative, to her first meeting of the Board.  
3.         Declaration of Member's Interests 
The Board noted there were no declarations of member's interests. 
Item 3.
Page 4

Page 5

Mr Riddell did however state that he was Chair of the Mental Welfare Commission
Scotland.  This was noted.   
4.         Minutes of meeting of 28 September 2023 
The minute of the meeting of 28 September 2023 was submitted and approved.  
5.         Action Log of 28 September 2023 
The Action Log of the meeting of 28 September 2023 was discussed and updated
accordingly.  
Mr Riddell welcomed the report on today's agenda relating to the Adult and Older
Mental Health Workforce however noted that was just one part of mental health and
asked that further reports be brought to the Board to address the wider aspects of
mental health services within Moray.  
6.         Minutes of Special Meeting dated 26 October 2023 
The minute of the Special Meeting of 26 October 2023 was submitted and approved.  
7.         Chief Officer Report 
The meeting had before it a report by the Chief Officer informing the Board of the
Chief Officer activities that support the delivery against the Moray Integration Joint
Board's (MIJB's) strategic priorities articulated in the Strategic Plan, and the delivery
against the 9 Health and Wellbeing outcomes.  Key work for the Partnership includes
the implementation of Home First; remobilisation from the covid pandemic; supporting
measures for the reduction of local covid transmission; and budget control.  
During the course of an update from the Director of Planning and Performance, DHI-
Scotland on the Moray Growth Deal and Rural Centre of Excellence (RCE) for digital
health care and innovation, she advised in relation to the Smarter
Housing/Communities and Mental Wellbeing Living Labs (LL) shown as amber on the
Appendix, DHI-Scotland were working with Moray Council and funders on a no cost
12 month extension to the programme until May 2026. 
Following consideration the Board unanimously agreed:  
i. to note the contents of the report; and 
ii. that transforming services to meet the aspirations of the MIJB's Strategic Plan
remains a priority.  
8.         Grampian Vaccination and Immunisation Annual Report 2023 
The meeting had before it a report by the Vaccination Planning Manager informing
the Board on the development of the first Grampian Vaccination and Immunisation
Annual Report 2023.  
Having sought feedback in order to develop reports, the Vaccination Planning
Manager agreed to add trend data and workforce planning elements to future annual
reports. 
Page 5

Page 6

Following consideration the Board unanimously agreed to acknowledge the findings
of the Vaccination and Immunisation Annual Report 2023.  
9.         Revenue Budget Monitoring Quarter 2 2023-24 
The meeting had before it a report by the Interim Chief Financial Officer updating the
Board of the current Revenue Budget reporting position as at 30 September 2023 for
the MIJB budget.  
Following consideration the Board unanimously agreed to:-  
i. note the financial position of the Board as at 30 September 2023 is showing an
overall spend of £5,068,191 on core services; 
ii. note the provisional forecast position for 2023/24 of an overspend of £10,615,345
on total budget for core services; 
iii. note the progress against the approved savings plan in paragraph 6; 
iv. note the budget pressures and emerging budget pressure as detailed in
paragraph 7; 
v. note the revisions to staffing arrangements dealt with under delegated powers
and in accordance with financial regulations within the Council (MC) and NHS
Grampian (NHSG) for the period 1 July to 30 September 2023 as shown in
Appendix 3; 
vi. approve for issue the Directions arising from the updated budget position shown
in Appendix 4; and 
vii. note that a recovery and transformation plan will be brought to the MIJB in
January 2024.  
10.         Vary Order of Business 
The Chair sought agreement from the Board to vary the order of business set down
on the agenda and take Item 10 "Moray Winter Surge Action Plan 2023-24" and Item
11 "Review of Financial Regulations" before Item 9 "Adult and Older Adult Mental
health Medical Workforce" to allow time for the author to join the meeting to speak to
the report.  This was unanimously agreed.  
11.         Moray Winter Surge Action Plan 2023-24 
The meeting had before it a report by the Chief Officer informing the Board of the
Health and Social Care Moray Winter/Surge Action Plan for 2023/24.  
Following consideration the Board agreed to:-  
i. note that Health and Social Care Moray (HSCM), including GMED (the NHS out
of hours service) have robust and deliverable plans in place to manage the
pressures of surge at any time of the year including the festive period; and 
ii. note that the Moray Winter/Surge Action Plan 2023/24 has been submitted to
NHS Grampian for inclusion in the Grampian Health and Social Care Winter
(Surge) Plan.
Page 6

Page 7

12.         Review of Financial Regulations 
The meeting had before it a report by the Interim Chief Financial Officer seeking the
approval of the Board to update the Financial Regulations in line with the proposed
amendments contained within Appendix 1.  
Following consideration the Board unanimously agreed:-  
i. to approve the proposed changes to the MIJB Financial Regulations as set out in
Appendix 1; and 
ii. the reviews will be done annually.  
13.         Adult and Older Adult Mental Health Medical Workforce 
The meeting had before it a report by the Interim Integrated Service Manager, Mental
Health and Substance Misuse informing the Board of progress and expectations for
the Adult and Older Adult Mental Health Medical team and seeking approval on a
proposal to solve a long standing issue of vacancies in the team.  
Following consideration the Board unanimously agreed to:-  
i. note the content of the report; and 
ii. approve that the funding is utilised differently and that the Board employ
Speciality Doctors on the Certificate of Eligibility for Specialist Registration
(CESR) program.  
14.         Care for People Plan - Moray Arrangements 
The meeting had before it a report by the Corporate Manager providing assurance to
the board that Health and Social Care Moray have developed an operational process
to deliver the Care for People Strategy and that the development of this framework
has been in conjunction with Moray Council as its strategic partner.  
In response to concerns raised by members of the Board that the Care for People
Plan was not attached to the report, the Corporate Manager advised it was an
evolving document but acknowledged that the Board required to have oversight of the
Plan in order to have assurance.  As a result of the discussion the Chief Officer
advised an updated report with the Plan as an Appendix would be brought forward to
the next meeting of the Board in January 2024.      
Following consideration the Board unanimously agreed to:  
i. note that a Care for People Operational Framework has been developed in
conjunction with its partners; 
ii. note that continued improvement and implementation of the Care for People is
now business as usual; and 
iii. note that Health and Social Care Moray (HSCM) will exercise this framework at a
Moray and Grampian level to provide additional support and assurance.
Page 7

Page 8

15.         Annual Report of the Chief Social Work Officer 2022-23 
The meeting had before it a report by the Chief Social Work Officer informing the
Board of the annual report of the Chief Social Work Officer (CSWO) on the statutory
work undertaken on the Council's behalf during the period 1 April 2022 to 31 March
2023.  
In response to a question from Councillor Colyer about there being no reference to
unpaid carers in the report, the Chief Social Work Officer confirmed she would ensure
that data is added to future reports.  
Mr Robertson suggested the report be brought to the Board earlier in the year and for
an executive report to be added to the front page.  The Chief Social Work Officer
agreed to bring the report earlier to the Board and add an executive report to the front
page.  
Following consideration the Board unanimously agreed to note the contents of the
report. 
16.         Moray Integration Joint Board Meetings 2024-25 
The meeting had before it a report by the Corporate Manager asking the Board to
consider future arrangements for holding meetings of the Moray Integration Joint
Board, the Audit, Performance and Risk Committee and the Clinical and Care
Governance Committee and to agree the meeting dates for 2024/25.  
As Chair of Clinical and Care Governance Committee and in order to allow him to
attend in person over the winter months, Mr Murray queried if the start time of the
November 2024 and February 2025 meetings could be brought forward from 2pm to
1.30pm.  The Clerk advised the dates had not yet been advertised and confirmed the
start time could be amended.  
Following consideration the Board unanimously agreed to endorse the schedule of
meetings for the Moray Integration Joint Board (MIJB), the Audit, Performance and
Risk (APR) Committee and the Clinical and Care Governance (CCG) Committee for
2024/25 with the amended start time of 1.30pm for the November 2024 and February
2025 Clinical and Care Governance Committee meetings.  
17.         Realignment of Services [Para 6.2.5] 
The meeting had before it a report by the Head of Service / Chief Social Work Officer
asking the Board to note the re-alignment of the Education and Social Training Team
(Social Work Training Team) (with the exception of 1 full time equivalent (FTE) post
which is aligned to Education) from Moray Council to Moray Integration Joint Board
(MIJB). 
Following consideration, and following the agreement of Moray Council on 27
September 2023, the Board unanimously agreed to:- 
i. note the re-alignment of the Education and Social Care Training Team/Social
Work Training Team (with the exception of 1 FTE post which is aligned to
Education) from Moray Council to MIJB with effect from 1 February 2024, with the
Page 8

Page 9

management responsibility transferring to the Head of Service/Chief Social Work
Officer; and 
ii. note that implementation will be taken forward in accordance with Moray
Council's agreed Change Management Policy and Procedures. 
Page 9

Page 10

MEETING OF MORAY INTEGRATION JOINT BOARD 
Thursday 30 November 2023 
ACTION LOG 
ITEM
NO.
TITLE OF
REPORT
ACTION REQUIRED DUE DATE ACTION
BY
UPDATE FOR 25
JANUARY 2024
1. Revenue Budget
Monitoring
Quarter 1 for
2023-24
Update on work being done to reduce
prescribing costs to be prepared for CCG Cttee
before coming to future MIJB meeting.
30 Nov 23 SC Paper to be presented to
next CCG Cttee in March
2024
2. Action Log of 30
November 2023
Request for further reports to be brought to the
Board addressing the wider aspects of mental
health in Moray. 
28 Mar 2024 SBI Report scheduled for
March MIJB meeting
3. Care for People
Plan – Moray
Arrangements
Update report including Care for People Plan
as an Appendix to be prepared for next Board
meeting.
25 Jan 2024 SD On today’s agenda 
Item 4.
Page 10

Page 11

REPORT TO: MORAY INTEGRATION JOINT BOARD ON 25 JANUARY 2024 
SUBJECT:   CHIEF OFFICER REPORT 
BY:  CHIEF OFFICER 
1.   REASON FOR REPORT 
1.1 To inform the Board of the Chief Officer activities that support the delivery
against the Moray Integration Joint Board’s (MIJB’s) strategic priorities
articulated in the Strategic Plan, and the delivery against the 9 Health and
Wellbeing outcomes. Key work for Moray Health and Social Care Partnership
(HSCP) includes the continuation of a shift in the balance of care through
implementing a Home First approach; remobilisation from the covid pandemic;
supporting measures for the reduction of local covid transmission; and budget
control. 
1.2 Strategic planning needs to maintain a focus on transformational change to
deliver services to our community within the resources we have available.
2024/25 will be a very challenging year for delivering within the budget, with
our two funding partners, Moray Council and NHS Grampian, under
considerable financial pressure as well. 
2.   RECOMMENDATION 
2.1 It is recommended that the MIJB:
i) consider and note the content of the report; and 
ii) agree that transforming services to meet the aspirations of the
MIJB’s Strategic Plan remains a priority. 
3. BACKGROUND 
Home First and Hospital without Walls 
3.1 Work continues to develop the Home First portfolio of projects with a focus on
ensuring projects are sustainable, scalable and meet the strategic objectives
of the MIJB. Work is being undertaken in a Portfolio approach, pulling on the
strengths and assets at a whole system level.  Efforts include a focus on
reducing delayed discharges, which has been very challenging to achieve
despite the significant work of the team.  To maximise opportunities to support
patient flow, a Moray wide Strategic Multidisciplinary Team meets to prioritise
Item 5.
Page 11

Page 12

resource.  A strategy group and operational group reviewing the challenges of
Care at Home provision have both met with action plans developed. 
3.2 Our MIJB Strategy ‘Partners in Care’ delivery plan sets out our 3 priority
areas, one of which is Home First. 
3.3 The current Care at Home Contract with external providers ends in October
2024. We therefore need to take the opportunity to review the Care at Home
Service and use any learning gained to inform the modernisation of service
delivery. 
3.4 The aim is to create a more efficient and sustainable service, which is able to
meet the needs of an ageing population, at a time when recruitment is
challenging. There are opportunities around better use of technology; creating
more fulfilling roles for staff; and using a reablement approach. 
3.5 To do this we will: 
1. Consider national priorities and have clarity around local performance
indicators.
2. Set the strategic direction of Care at Home across Moray (Partners in
Care) to ensure that Care at Home is delivered as efficiently and
effectively as possible, whilst at the same time ensuring that outcomes are
met, and this will be achieved by reviewing Care at Home referral
pathways and all that it encompasses.
3. Mapping of where Care at Home is delivered. 
4. Identify areas of unmet need.
5. Deliver on the outcomes of the Delivery Plan.
6. Deliver on the Workforce Plan, with particular attention to recruitment and
retention of staff.
7. Explore and focus on technological advances to support our Care at Home
strategy and action planning.
8. Identify roles and responsibilities of external and internal provider services. 
9. Develop a shared understanding of goals and values.  Use of the NHS
Culture Collaborative resources will support this work. 
3.6 Key dates for the review are as follows: 
Action Stage Date 
Draft Specification (incl. needs assessment,
stakeholder involvement, options appraisal.)
10.05.24
Draft Specification signed off by Head of Service 25.05.24
Deadline Final Signed Off Specification 07.06.24 
3.7 There is currently a draft Action Plan around all elements of the Care at Home
Service, which will be reviewed early this year. A programme management
approach will be undertaken to manage the necessary work-plan for the
modernisation of the Care at Home Service. 
3.8 It is imperative that we work both collaboratively and in partnership with all
stakeholders, and to this end a Care at Home workshop will be held early this
year, to include an extensive list of stakeholders. 
Page 12

Page 13

3.9 Value improvement funds have supported the establishment of Realistic
Medicine Community Healthpoint Advisor roles, which aim to improve
awareness and promote support available for older people, their families and
carers living with frailty and pre-frailty conditions. These programmes will
contribute to key priorities within Home First, The Frailty Collaborative and
performance monitoring. 
3.10 Health and Social Care Moray (HSCM) is part of a national initiative to
improve the frailty pathway, having bid successfully to be part of the Focus on
Frailty programme being run by Healthcare Improvement Scotland ihub.  The
overall aim of the programme is to ensure people living with or at risk of frailty
have improved experience of and access to person centred, co-ordinated
health and social care. This will be realised by early identification and
assessment of frailty; people living with frailty, carers and family members
access person-centred health and social care services: and health and social
care teams report improved integrated working. 
Remobilisation and winter planning 
3.11 To date the health and social care system has responded to significant surges
in demand. A pan Grampian approach to manage surge and flow through the
system ensures patients/service users receive the care they require. Staff
within Moray, across all sectors of health and social care, including
independent providers and the third sector, have stepped up to the challenge
on a daily basis. There is significant pressure in some service areas which is
receiving a particular focus to work through the backlog of referrals. 
3.12 Demand for unscheduled hospital care has not discernibly diminished, and Dr
Gray’s Hospital is having to manage a very tight capacity position on a daily
basis. Community hospital beds, and intermediate options are being fully
utilised, with expedient discharge from Dr Gray’s and Aberdeen Royal
Infirmary as soon as beds are available. Demand for social care, and in
particular care at home, has continued with hours of care that cannot be met.
Primary care continues to operate with a high level of demand and acuity.   
3.13 Planning has taken place locally and at a pan Grampian level for winter. A
paper reporting on the partnership’s planning was considered by MIJB at their
meeting on 30 November 2023 (para 11 of minute refers). In the run up to the
festive season there was a significant spike in hospital attendances and
admissions in the time period of 4 December to 9 December that correlated to
particularly cold weather. 151 people attended the Emergency Department
during this time because of a fall that they reported being on ice or snow. This
has then translated into an increase in demand for community services. 
3.14 There was specific planning for the festive season over Christmas and New
Year, and while there were particular pressures on both the hospital and
community services, the system managed with the levels of demand. Lessons
learned are being captured to build on the good work as a piece of continuous
improvement.       
Vaccination Programme 
3.15 The Autumn Winter programme for Covid and Flu vaccinations commenced
on 4 September 2023 and will run until 31 March 2024 with the majority of
eligible cohorts offered vaccinations by 11 December 2023, including Health
and Care staff. As of 31 October 2023, 606,933 Covid and Flu vaccinations
Page 13

Page 14

were delivered by NHS Grampian, which is above the Scottish average for
both vaccinations. The Health and Care staff uptake for vaccinations is slightly
below the Scottish average, with further focus on this group to continue to
support the messaging to encourage uptake. There is ongoing review of the
uptake by job family and location to support this messaging with a National
Survey planned for early 2024 to understand why some Health and Care Staff
have not taken up the offer of the vaccinations and any barriers to this.   
Ward 4 anti-ligature work and installation of MRI scanner at Dr Gray’s  
Hospital 
3.16 A dedicated work stream is in place to manage the programme of works on
the Dr Gray’s Hospital site that involves completing the anti-ligature work on
Ward 4, the Mental Health inpatient ward, alongside the planned installation of
an MRI scanner on the hospital site. The Standard Business Case (SBC) with
Addendum requested by the NHS Grampian Board in August 2022 detailing
the enabling works plan, costs and timescales, as well as the Ligature
Reduction schedule and cost, has been finalised and approved by the NHS
Grampian NTC (National Treatment Centre) Programme Board and Asset
Management Group. The SBC has been submitted to Scottish Government
for consideration and dialogue continues with officials on the SBC and timing
of funding. With the pressure on the NHS Scotland capital budget HSCM were
advised that a decision would not be forthcoming until the end of December
2023. We still await a decision. 
Primary Care Strategy 
3.17 The 3 Chief Officers (Aberdeen City, Aberdeenshire and Moray) have
commissioned work to develop a vision for general practice across Grampian.
The fragility of primary care and GP Practices in particular is well understood,
and MIJB have led local discussions on the challenges faced. In Grampian,
the delivery of the 2018 General Medical Services (GMS) contract and the
Memorandum of Understanding (MoU) has been challenging, due to a
number of factors, including recruitment and retention, the application of multi-
disciplinary teams across a rural geography resulting in teams being spread
too thinly, and a region with diverse populations, communities and needs. 
Whilst the number of practices and General Practitioners (GPs) has reduced
in number during the last ten years, the list size per GP has increased. 
3.18 A structure is in place to take this work forward, with a timescale of completion
by the end of the financial year. The vision for general practice will recognise
the uniqueness of the three different local authority areas in Grampian, and
bring together the commonalties of the challenges we collectively face, and
how we deal with those challenges. The national primary care team are
supportive of this work, and this creates an opportunity for the north-east
region to influence the national GP contract and create a path specific to the
north-east on how to meet the challenges. The aim is to develop a local vision
with strategic objectives and an associated implementation plan to address
the challenges, with a desired outcome of creating a more resilient and
sustainable service. 
3.19 The General Practice Vision programme has now concluded the three
facilitated stakeholder events. Buchan + Associates were commissioned to
plan and deliver workshop 2 & 3. These events were held on 8 and 22
November 2023, and attendance numbers at these events was 206 people
and 215 people respectively. Stakeholder engagement targeting the younger
Page 14

Page 15

generation was undertaken in December 2023, which included focus groups
in high schools across the area, and a stall at Aberdeen University to engage
with students. There will also be engagement with Medical Students early
2024. Feedback from these groups will be supplemental to the information
and feedback already gathered. A fourth workshop has been arranged for 17
January 2023, and this will be a smaller workshop, with attendance from the
Programme Board, as well as other key stakeholders which will include
representation from secondary care, patient stakeholder groups, and finance. 
Themes that have been identified and will be included in the vision include:
• Pathways 
• Data
• Models of contract 
• Premises 
• Keeping the population well 
• IT & Technology 
• Multi-Disciplinary Team 
• Mental health 
• Education 
• Continuity 
3.20 The Vision and SMART objectives will be presented to the three IJB’s on the
following dates:
20 March 2024 – Aberdeenshire IJB
26 March 2024 – Aberdeen City IJB
28 March 2024 – Moray IJB 
General Adult Mental Health Secondary Care Pathway Review
3.21 The Chief Officers for Aberdeen City, Aberdeenshire and Moray have
commissioned a piece of work to map out the Adult General Mental Health
(AMH) Pathways across Grampian to be able to consider options for any
redesign. The aim of the work is to identify improvements within the pathways
of adult general mental health which would lead to better patient and service
outcomes, improve efficiency, and streamline governance. A new timeline has
been proposed to support this project to allow for more opportunity early this
year to consolidate information gathering and ensure accuracy of the
information gathered so far. The timeline would lead to IJB meetings in May
2024. 
3.22 We continue to consolidate process mapping and service information forms.
This will inform an engagement piece with the steering group and other key
stakeholders, to share more widely, the themes arising from the
challenges/issues shared about the AMH secondary care pathway, and as an
opportunity to gather ideas and awareness of ongoing projects that may be
addressing some of these issues. Data gathering will continue against these
themes. Engagement with Lived Experience continues through an online
survey which is scheduled to conclude mid-January and will feed into the
report. 
Lossiemouth Locality update
3.23 Between October 2021 and January 2023 a period of community engagement
and consultation took place on the future of health and social care provision
within the Lossiemouth Locality Area. There has been a focus on the
Hopeman and Burghead branch surgery premises. An update is provided on
today’s agenda.  
Page 15

Page 16

Payment Verification 
3.24 National Services Scotland (NSS) process contractor payments and during
the pandemic their focus had been to maintain protective payments each
month. The payment verification meetings have now recommenced for all
groups. Once sufficient data is available a report will be presented to the
Audit, Performance and Risk Committee. 
Management capacity
3.25 There are a number of competing priorities; a system that is constantly under     
pressure; and an urgent requirement to decrease expenditure. In order to
retain a balance between these priorities MIJB will need to be innovative
about how to retain a management capacity that can satisfy all these
demands. With the loss of a strategy and planning lead; a lead for
performance; and an imminent retiral, the three Grampian HSCPs have
discussed how to progress a “once for Grampian” approach where it is
appropriate to do so. An agreement with Aberdeen City Partnership is rapidly
being developed on how a more effective strategy, planning and performance
function can be delivered for Moray, at less cost. A recruitment process has
also been undertaken for a permanent Chief Finance Officer in partnership
with NHS Grampian, and as a result of a competitive process the Interim
Chief Finance Officer will become permanent from 1 April 2024, with a remit
for MIJB and the Moray Portfolio. 
Moray Growth Deal and the Rural Centre of Excellence (RCE) for digital
health and care innovation 
3.26 Appendix 1 sets out the latest position on progress. The Moray Portfolio
continues to work closely with RCE as part of the transformation programme
for the Portfolio. These updates will continue to be a regular feature on the
Chief Officers reports.  
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The opportunity remains to accelerate work of the MIJB ambitions as set out
in the Strategic Plan. Home First is the programme designed to do that, with
the opportunities of an expanded portfolio of health and care that also
encompasses Dr Gray’s Hospital and Children’s Social Work and Justice
Services. 
4.2 The challenge of finance persists and there remains the need to address the
underlying deficit in core services. Funding partners are also under severe
financial pressures and are unlikely to have the ability to cover overspends
going forwards. 
4.3 Transformational change, or redesign, that provides safe, high quality
services, whilst bringing more efficient ways of operating, will be the focus for
the senior management team as the route to operating within a finite budget,
while meeting the health and care needs of the Moray population.   
Page 16

Page 17

5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Partners in Care 2022 – 2032”
Working with our partners to support people so they can cope with, and
where possible, overcome the health and wellbeing challenges they may
face. 
Ensuring that the right care is provided at the right place at the right time
when people are in need. Ensuring that our systems are as simple and
efficient as possible. 
(b) Policy and Legal
The Chief Officer continues to operate within the appropriate level of
delegated authority, ensuring that the MIJB is sighted on key issues at
the earliest opportunity, and continues to influence and agree the
strategic direction. 
(c) Financial implications
There are no financial implications arising directly from this report. The
Interim Chief Finance Officer continues to report regularly. There is an
ongoing requirement to find efficiencies and to demonstrate best value
for money. 
(d) Risk Implications and Mitigation
The risk of not redesigning services will mean that Health and Social
Care Moray (HSCM) and the Moray Portfolio cannot respond adequately
to future demands.   
(e) Staffing Implications
Staff remain the organisation’s greatest asset, and engagement with all
sectors must continue to ensure full involvement, which will create the
best solutions to the challenges faced. HSCM staff are facing continued
pressures on a daily basis, and effort into ensuring staff well-being must
continue. 
The threat of industrial action by Junior Doctors will have an impact on
the ability to maintain performance and continuity of care. HSCM will use
a Portfolio approach and full use of the Portfolio teams to mitigate risks.   
(f) Property
There are no issues arising directly from this report. 
(g) Equalities/Socio Economic Impact
Any proposed permanent change to service delivery will need to be
impact assessed to ensure that HSCM are not disadvantaging any
section of our community. 
HSCM will continue to work closely with all our partners to ensure that
we contribute to the health and well-being of the community and support
the recovery phase of the Covid-19 pandemic. 
Page 17

Page 18

(h) Climate Change and Biodiversity Impacts
Care closer to and at home, delivered by teams working on a locality
basis, will reduce HSCM’s reliance on centralised fixed assets and their
associated use of utilities. 
(i) Directions
There are no directions arising from this report. 
(j) Consultations
The Moray Portfolio Senior Management Team, the Legal Services
Manager and Caroline O’Connor, Committee Services Officer have been
consulted in the drafting of this report. 
6. CONCLUSION 
6.1 The MIJB are asked to acknowledge the significant efforts of staff,
across in-house providers, externally commissioned services, the
Independent and Third Sector, who are supporting the response to the
recovery, and the drive to create resilience and sustainability through
positive change. 
6.2 The size of the financial challenge facing the MIJB, and also its two
funding partners, means that redesign and transformation is not an
option but a necessity. HSCM’s approach will be to prioritise quality,
safety and good outcomes in all service redesigns. 
Author of Report: Simon Bokor-Ingram, Chief Officer, Moray Portfolio
Page 18

Page 19

Digital Health & Care Innovation Centre, 1st Floor, Suite B,
Inovo Building, 121 George Street Glasgow, G1 1RD
APPENDIX 1
This paper is presented to the January 2024 Moray IJB to give an
update on the progress of the Moray Growth Deal, Rural Centre of
Excellence for Digital Health and Care Innovation 
This £5 million UK Government funded programme of the Rural Centre of Excellence (RCE)
Research and Development (R&D) programme as part of Moray Growth Deal, commenced in
late 2021 with the ambition to create a unique ecosystem in the Moray region to foster
economic development and create jobs through the creation of a physical Demonstration
and Simulation environment (DSE) at UHI Moray, underpinned by a virtual R&D
infrastructure, five living labs and a robust skills and workforce development programme.   
Working closely with the citizens, health and social care Moray, NHS Grampian and third
sector organisations, the living labs methodology uses co-design approaches to validate and
address key national and local strategic priorities in order to release clinical and care capacity
and make services more accessible enabled by digital to meet targeted demand, and to
improve the health and wellbeing outcomes for the citizens of
Moray.  http://www.moray.gov.uk/moray_standard/page_114144.html
The image below provides a visual representation of the R&D infrastructure, assets and Living
Lab (LL) R&D themes and the skills programme being progressed within the RCE.   
Image 1:  Key R&D assets and the 5 Living Lab (LL) Themes  
Item 5.
Page 19

Page 20

Digital Health & Care Innovation Centre, 1st Floor, Suite B,
Inovo Building, 121 George Street Glasgow, G1 1RD 
RCE Activity Update December 2023 -January 2024 
Programme Update 
DHI are awaiting confirmation this month from Scottish and UK governments of the approval
of a change control request submitted in November 2023.  If approved, this will allow the
project to run until May 2026 with a new budget profile and will enable additional and more
complex R&D assets to be developed along with maturation of those currently being
progressed.  As outlined below in figure 1, this will potentially see the development of a
smart community tool with eventual AI capability to support both individual and population
management through the collation, monitoring and analysis of holistic data held by the
individual through a personal data store.  By establishing participating citizen’s normal health
and functional baseline, it is envisaged that the analysis of ongoing consented data sharing
will help to identify early indicators of change and trigger self-management signposting or
intervention as appropriate to maintain health, wellbeing, and independence and reduce
hospital admissions.  The integration of data from health, care, third sector, housing and
personal sources into a single analysed platform is an internationally unique approach and
believed to have significant economic value for the Moray region through scalability
potential.    
Figure 1: Proposed RCE asset integration model (subject to change control approval) 
Page 20

Page 21

Digital Health & Care Innovation Centre, 1st Floor, Suite B,
Inovo Building, 121 George Street Glasgow, G1 1RD 
Living Lab Updates: 
LL1 Supported Self- Management
Final iterations and user testing via the Dietetic service are being completed for the weight
management platform. The team are awaiting approval of the Data Protection Impact
Assessment (DPIA) submitted to NHS Grampian, as this is necessary to move to live testing,
this may delay the project moving to the real-world evidence stage in February 2024.  This
has been raised as a project risk and mitigations are being explored. The delivery working
group now meets regularly, and work continues to develop the evaluation framework.   
LL2 Long Term Condition Management (NHS) 
No bids were received following the first call on the Dynamic Purchasing System (DPS) which
sought industry partners to develop a solution to tackle access deprivation with an initial
clinical focus of Type 2 Diabetes.  Feedback has been sought from those who have registered
for this procurement lot and is being analysed to inform an options appraisal to identify how
best to proceed.   
LL2 Long Term Condition Management (Community)  
Procurement documentation is being prepared for this pathway, which focuses on the
development of digital tools to support the Community Occupational Therapy Service. A
rapid pitch went live December and can be viewed here: Rapid Pitch Open Challenge -
Occupational Therapy Digital Assessment & Triage to support community care | Digital
Health & Care Innovation Centre (dhi-scotland.com)   A call to industry via the DPS is planned
for February 2024, with the focus on tools to support self-assessment and digital triage of
referrals.  The proposed future state can be seen in figure 2. 
Figure 2: Proposed future state map 
LL3 Care in Place 
User testing has now been completed, with a final iteration of the Community Connections
platform and personal data store assets in progress.  This living lab will move to a phased real
world evidence stage in February 2024 for a minimum of 6 months and will run in the Forres
and Lossiemouth areas, supported by the west community care team and Quarriers. The
evaluation framework continues to be developed.   
Page 21

Page 22

Digital Health & Care Innovation Centre, 1st Floor, Suite B,
Inovo Building, 121 George Street Glasgow, G1 1RD 
LL4 Smart Housing 
A roadmap and scope for this living lab will be confirmed subject to approval of the change
control request.  There will be two pathways developed in parallel: 
1. Smart Housing Specification -
Define and initiate work is underway for this living lab, with work commenced on developing
an asset for the DSE in Elgin to demonstrate the benefits of the proactive and preventive use
of combined telehealth, digital telecare, activity monitoring, environmental monitoring and
home consumer devices. This will include an evidence-based appraisal of devices on the
market or at testing stage of development, to create a smart home specification for testing in
a real-world environment monitored through the development of a functional prototype of
the DSE simulation. Following evaluation, this will be used as the basis to develop a state-of-
the-art specification for new build smart enabled properties and prototype for testing ahead
of the deployment into Leanchoil Trust site properties by the MGD Housing Mix project team
in 2027/28 
2. Smart Communities - 
This pathway will take forward the smart housing platform asset and integrate this into a
holistic AI supported data platform to support individual and population management as
outlined in figure 1.  Procurement routes to establish a consortium to develop this complex
asset are currently being explored   
LL5 Mental Wellbeing 
It is likely that the following two distinct pathways will be developed subject to the change
control request approval: 
1. Mental wellbeing (MWB) pathway to develop tools and social prescribing linked to
the early Connected Communities platform and personal data store to support early
intervention and self-management 
2. Mental health (MH) pathway to develop digital tools to support an aspect of statutory
clinical services to be confirmed.  Data produced from this asset will be integrated
into the model outlined in figure 1 
Moray Frailty Work 
The RCE team are contributing to the HIS led project though representation on both the
strategic and community H&SC working groups, while enabling knowledge exchange from
broader DHI frailty work. Alignment and utilisation of the RCE R&D activity and assets will
compliment this workstream and allow for the inclusion of digital tools to enhance the citizen
and clinical experience. Digital opportunities within the Realistic Medicine, MEOC tool,
Primary Care, and early identification of frailty are currently being explored.   
Page 22

Page 23

Digital Health & Care Innovation Centre, 1st Floor, Suite B,
Inovo Building, 121 George Street Glasgow, G1 1RD 
Skills 
A successful and well attended SkillsFest event was hosted by the RCE on 23rd November
2023 at UHI Moray.  With a packed agenda featuring keynote speakers and a series of
workshops, this also included a soft launch of the recently developed micro credential
courses for carers. 
The academic call seeking a partner to undertake a review of workforce training tools and
identify gaps has been awarded and contracts are being finalised.  This will inform the scope
of further skills development calls in 2024. 
Communication and Engagement  
A refreshed communication strategy and sector specific plans have been developed and a
working group has been set up to progress the delivery plan.  A key area of the strategy
outlines the need for a partnership approach between DHI, H&SCM, NHSG and third sector
to develop workforce and citizen readiness for adoption of digital assets. 
A full schedule of events to build awareness of the demographic need for change, and
opportunities to participate in codesign to shape future assets is being finalised for 2024. 
Evaluation 
A framework for the academic evaluation continues to be developed by UHI to capture the
integrative and living lab specific outcomes across the whole programme.  Qualitative data
and evidence.   
Sustainability 
The sustainability of the RCE will be a key focus in 2024, supported by a working group with a
range of bids underway to ensure further funding is leveraged into the RCE in preparation for
the end of the UK Gov funding period for RCE. Preparation and discussion around service
readiness and needs for asset adoption continues to be progressed with H&SCM and NHS
Grampian. 
Page 23

Page 24

REPORT TO: MORAY INTEGRATION JOINT BOARD ON 25 JANUARY 2024 
SUBJECT:  STRATEGIC REVIEW OF NEURO–REHABILITATION PATHWAY 
BY:  LEAD FOR ALLIED HEALTH PROFESSIONALS AND
SPECIALIST REHABILITATION SERVICES AND
TRANSFORMATION PROGRAMME MANAGER 
1. REASON FOR REPORT 
1.1 To inform the Board of the findings and recommendations of a strategic review
undertaken to identify the most effective delivery of Neurorehabilitation across
Aberdeen City, Aberdeenshire, and Moray. 
2. RECOMMENDATION 
2.1 It is recommended that the Moray Integration Joint Board (MIJB): 
i) notes the findings of the strategic review of the neurorehabilitation
pathway; 
ii) agrees that Aberdeen City Integration Joint Board (IJB) as host IJB for
this service implements the proposed changes to the
neurorehabilitation pathway in collaboration with Health and Social
Care Moray (HSCM) and in a phased manner as set out in section 5; 
iii) agrees that an evaluation of Phase 1 will be shared with MIJB in
September 2024 before Phase 2 commences; and 
iv) notes the engagement to date with the Aberdeenshire and Moray
Health and Social Care Partnerships (HSCPs) and support the
continuation of the engagement to help ensure the redesign
continues to meet the needs of all three Partnerships. 
3. BACKGROUND 
3.1 Aberdeen City Health and Social Care Partnership (ACHSCP) holds hosted
responsibility for the delivery of Specialist Rehabilitation Services, including
Neurorehabilitation services, for Grampian as part of the shared governance
arrangements with Aberdeenshire and Moray HSCPs. Recommendations will
be progressed through each partnerships IJB Governance process. 
Item 6.
Page 24

Page 25

3.2 The Public Bodies (Joint Working) (Scotland) Act 2014 sets out the
responsibilities of the IJBs. A specific requirement is that IJBs have delegated
responsibility for strategic planning. The ACHSCP host the delivery of the
Rehabilitation Services, which includes Neurological Rehabilitation. 
3.3 The Aberdeen City IJB committed to a wider strategic review of all rehabilitation
services as part of its approval of the ACHSCP Strategic Plan 2022-2025.  It is
an identified project within the ‘Keeping People Safe at Home’ strategic aim.
This aim specifically outlines the following strategic priorities relevant to this
review:
• Maximise independence through rehabilitation. 
• Reduce the impact of unscheduled care on the hospital. 
• Expand the choice of housing options for people requiring care 
3.4 During the COVID-19 pandemic, Operation Home First created an increased
community facing ethos across all services with a focus on delivery and care
provision in the community as opposed to traditional provision in a hospital
setting. From a rehabilitation perspective this led to patients receiving support
in a community setting and within their home environment. This led to greater
connections with their community and a more personalised experience. 
3.5 In March 2022, Aberdeen City IJB agreed to shorten the notice period on a
contract with the operators of Craig Court, a transitional living rehabilitation
setting that had been in operation since 2009.  This decision was taken to
enable the full scope of options to be considered as part of a wider review of
the neurorehabilitation pathway. Following the change to the notice period, the
provider chose to exit the contract.   
3.6 The IJB agreed at its meeting in March 2022 to undertake a focused review of
the neurorehabilitation pathway in advance of the wider review of rehabilitation
services. This created a platform for exploring best practice and an opportunity
to consider how best to invest the resource that supports the current
neurorehabilitation pathway on a sustainable basis and in line with the
principles of good rehabilitation and the IJB’s strategic priorities. This included
giving consideration to the function of a transitional living unit within the
pathway and to explore how transitional living support could be provided in
different ways to best meet the needs of patients and carers within Grampian. 
3.7 The decision to prioritise the review of the neurorehabilitation pathway ahead of
the wider strategic rehabilitation review, has also created an opportunity to take
the learning from the process undertaken with neuro rehabilitation and outputs
of this as a ‘proof of concept’ of the approach. Any learning from this will help
inform both the wider strategic review work and any further specific pathway
reviews to be undertaken. 
3.8 A project team was formed to take this work forward. This review has allowed
for a wide engagement with a range of stakeholders including patient, family
and carer input as well as a wide range of staff, both within the pathway and
partners such as HSCP colleagues to gather views regarding priorities for the
model of service delivery for current and future patients. 
3.9 This review has considered and incorporated relevant National best practice
frameworks and relevant reports including: 
Page 25

Page 26

• Scottish Government, Neurological care and support: Framework for
Action 2020 -2025 (https://www.gov.scot/publications/neurological-care-
support-scotland-framework-action-2020-2025/pages/4/) specifically,
Commitment 9: 
“We will support Integration authorities and the NHS to improve services
and support with a commitment to evaluate and test generic / neurology
based multi-disciplinary team models and test innovative ways of
delivering health and social care, including new roles and new
arrangements for coordinating care and support for coordinating care
and support for people with neurological conditions”. 
3.10 And 5 key objectives were identified and adopted locally by Project Team: 
• Ensure people with neurological conditions are partners in their care and
support.
• Improve the provision of co-ordinated health and social care and support
for people with neurological conditions.
• Ensure high standards of effective, person centred and safe care and
support.
• Ensure equitable and timely access to health and social care and
support across Scotland.
• Build a sustainable neurological workforce for the future. 
• Rehabilitation and Recovery: A once for Scotland person-centred
approach to rehabilitation in a post-COVID era
(https://www.gov.scot/binaries/content/documents/govscot/publications/s
trategy-plan/2022/06/rehabilitation-recovery-once-scotland-person-
centred-approach-rehabilitation-post-covid-era/documents/rehabilitation-
recovery-once-scotland-person-centred-approach-rehabilitation-post-
covid-era/rehabilitation-recovery-once-scotland-person-centred-
approach-rehabilitation-post-covid-
era/govscot%3Adocument/rehabilitation-recovery-once-scotland-person-
centred-approach-rehabilitation-post-covid-era.pdf)  which sets out the 6
key principles of good rehabilitation. 
• National Health & Wellbeing Outcomes Framework
(https://www.gov.scot/publications/national-health-wellbeing-outcomes-
framework/
Page 26

Page 27

• The British Society of Rehabilitation Medicine’s Standards
(https://scottish.sharepoint.com/sites/GRAMStrategicReviewofRehabilitat
ion/Shared%20Documents/GRAM%20Neuro-
Rehabilitation%20Review/06.%20Commission%20&%20Business%20C
ase/bsprm.org.uk/publications/clinical-standards-documents) 
• WHO 2030 rehabilitation vision describes rehabilitation as an investment
with cost benefits for individuals and wider society that go beyond health
system benefits too e.g., increased employability, decreases need for
financial or care support requirements, contributes to wider healthy
ageing, all of which are relevant for this patient group, particularly given
the younger demographic and the life changing experiences they have
had and the need to optimise their function and quality of life across their
remaining lifespan. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
Demographics – who is accessing Neurological rehabilitation now?
4.1 The scope of the review can be broadly defined as the Specialist
Neurorehabilitation services provided for those conditions falling under the
remit of neurosurgery and neurology including:
• Acquired brain injury
• Spinal injury 
• Neurological disorders of movement or posture (for example cerebral
palsy) 
• Epilepsy
• Functional neurological disorders 
• Prolonged disorders of consciousness 
• Rehabilitation elements of ongoing care for patients with tracheostomies 
• A range of progressive neurological conditions such as Parkinson’s
disease, Multiple Sclerosis, Huntington’s, and Motor Neurone disease 
4.2 For the progressive neurological conditions, these conditions are considered
within scope only in the context of providing rehabilitation in the above outlined
services. It is recognised that many of these conditions are involved in separate
pathways for their long-term management and care, though patients may be in
contact with the neurorehabilitation pathway at times, for example a patient with
Parkinson’s disease may be seen at the Horizon’s clinic. 
4.3 Stroke falls under the scope of the review only for the parts of the pathway
where patients may be provided care in a setting such as a transitional living
unit or outpatients centre such as Horizons Rehabilitation Centre.  Horizons
provides an assessment and therapeutic service for individuals aged 16-65
across Grampian with complex needs whose disability requires a multi-
disciplinary approach. There is ongoing work developing the stroke pathway
happening in parallel with this review, and the two processes will be closely
monitored by programme management for interdependency and shared
learning.   
4.4 The patient profile of those accessing the Grampian Specialist
Neurorehabilitation services is:
• 40% patients are from Aberdeen City;
• 40% Aberdeenshire;
Page 27

Page 28

• 10% Moray; and 
• 10% originating from other local authority areas e.g. Island Boards. 
4.5 The neurorehabilitation pathway has an age demographic that is younger than
some other pathways with over 62% of the patient population under the age of
65. 
4.6 The latest full year data shows that in 2022 the number of patients admitted to
acute neurological settings in Aberdeen Royal Infirmary (ARI) was reported as
1514 and that 81 patients were admitted to the Neuro Rehabilitation Unit (NRU)
at Woodend Hospital. While the majority of admissions to NRU are step-down
from ARI, there are some direct admissions into NRU from the community.
4.7 Reviewing patient recovery destinations, the majority of patients from the acute
setting at ARI return to a home environment.  In the case of NRU less than 75%
go directly home reflecting the complexity of the ongoing rehabilitation of care
provision needs of this patient cohort.  Many require ongoing care, and some
require varying elements ongoing multidisciplinary team (MDT) support. 
Stakeholders
4.8 A Project Delivery Group was established with a membership of Operational
and Specialist leads with significant lived experience of working within the
neurorehabilitation pathway alongside third sector and Scottish Care
colleagues. The patient’s voice was represented through Friends of Neuro and
links with Brain Injury Group (both being charities which have had long-held
connections with the neuro rehabilitation pathway) and include representation
from across Grampian. Qualitative feedback and input from patient workshops
and consultations was also evaluated. 
4.9 This group provided a structure to exploring and leading throughout the review
from sense-checking experience and building on learning. This at times has
been challenging in terms of gaining assurance that all plans are connecting in
each Partnership area given different pattern of needs and staffing structures.
We continue to offer Partnership specific meetings to consider and address
these and engagement with the Aberdeenshire and Moray HSCPs will continue
throughout the redesign. 
The functional parts of the pathway
Wards 204/205
4.10 The two acute neuro wards in ARI form the initial stage in the pathway and
patients requiring in-patient specialist rehabilitation will step down from these
areas into NRU. The waits experienced by patients due to 100% occupancy in
NRU (see run chart below): 
Page 28

Page 29

4.11 This highlights the potential for appropriate patients to be linked in at an earlier
stage with the multi-disciplinary team (MDT) HomeLink approach. The MDT
HomeLink approach enables rehabilitation to commence at an earlier stage and
potential for progression to a community setting for some patients, rather than
NRU, ensuring the patient is reconnected with their network of support and
wider community as soon as possible. 
Neuro Rehabilitation Unit (NRU)
4.12 The Neuro Rehabilitation Unit is a 12 bedded unit on the Woodend Hospital
site. The ward generally runs at 100% occupancy with 0% readmission rate. 
From the project team reviewing Functional Independence Measures (FIM)
data, which is an internationally accepted outcome measure for rehabilitation, it
can be seen that high-quality person-centred care is being delivered with a high
level of patient satisfaction. Whilst the physical environment is dated, patient
feedback focuses upon the goal focussed rehabilitation and their positive
experience of this. It is anticipated that the longer-term location of this unit will
be considered through NHSG Woodend/future Blueprint planning project that is
due to get underway during 2024, where ACHSCP will be a key partner in
engaging with this work. 
4.13 When evaluating the effectiveness of the pathway to create positive outcomes
for patients, alongside addressing the wait time for accessing NRU and
potentially further reduce length of stay in NRU, a limiting factor identified within
the current pathway was therapy capacity in NRU. Therefore, investment in this
was explored and quantified to understand how these barriers to optimal
achievement whilst minimising in-patient bed days could be addressed. Timely
access to rehabilitation and the intensity that can be provided has an impact on
patient outcomes and length of stay. An investment in additional therapists
would allow more sessions to be available to individuals to focus on personal
rehabilitation goals. This in turn would result in a reduction in average bed days
and would increase the number of patients who could access NRU each year. 
In turn, this would reduce bed days waiting for transition through the neuro
rehab pathway for patients within ARI stepping down into NRU.  This supports
flow, creating capacity within ARI having the patient in the “right care, right
place”. By having timely access to the intensity of rehabilitation necessary, this
0
2
4
6
8
10
12
01/02/2017 01/02/2018 01/02/2019 01/02/2020 01/02/2021 01/02/2022 01/02/2023
Number of Patients Waiting Neuro Rehab - Per Day
Page 29

Page 30

will also support earlier discharge from NRU to the next stage in the patient’s
journey. This provides value, not only to the patient but to the wider system.
The investment in rehabilitation would seek to reduce the impact upon demand
across Acute, Primary Care, and Social Care. This capacity is included in
phase 1 of the proposed implementation. 
Transitional Living – Craig Court/Home link approach
4.14 Craig Court opened in 2009 and was commissioned to provide sixteen beds in
total.  These comprised of six long term beds, with some residents placed as
Continuing Care residents due to the complexity of needs; and 10 transitional
living rehabilitation beds used as a step down from hospital or step up from the
community to support patients across Grampian. Craig Court provided an
intensive rehab setting out with a hospital/medically led setting. This setting
was designed to bridge the period from in-patient rehab within the NRU to a
homely setting for the most complex of rehab presentations. Patients from
Craig Court transitioned into general rehabilitation services or home or a
residential setting depending on complexity of ongoing care need. 
4.15 Craig Court operated as a Transitional living unit and was a collaboration
between a commissioned provider, providing care and nursing roles alongside
an NHS team of staff consisting of Occupational Therapy, Physiotherapy,
Neuropsychology, Dietetics and Speech and Language therapy and admin
colleagues. 
4.16 During the pandemic, the NHS team from Craig Court were deployed back into
the main hospital settings as part of critical service protection measures.  The
team were deployed into areas of critical service staffing need and for a period
therefore did not operate as part of the neuro rehabilitation pathway. 
4.17 Following relaxation of pandemic staffing measures the Craig Court staff initially
supported the NRU staffing cohort. This staffing model allowed a continuous
focus on rehabilitation and allowed therapists to follow patients home to
continue work on therapy goals. This change was welcomed by patients and
carers. The focus of the team was initially ‘badged’ as Mobile Craig Court and
progressed thereafter into a HomeLink concept. This model allows a multi-
disciplinary team to support the patients’ transition from ward to home ensuring
a goal focused approach is adopted.  It allows therapy to be adapted to the
person’s own living environment (e.g. own cooking facilities and home layout). 
4.18 A short life working group was formed earlier this year with a representation
from the Project Delivery Group to explore options for Transitional Living
Arrangements specifically in the new model. Since late 2019, largely due to
Covid-19 restrictions, and following its closure in 2022, the Craig Court
Transitional living unit has not been in place for neuro patients. 
4.19 The group explored options based upon recent service delivery experiences
and considered a range of options for future models of delivery. They also
reviewed what had been in place since the closure of Craig Court and the
mitigations for this which have included rehabilitation in community and home-
based settings. As a result, a critical shift in thinking occurred. 
4.20 This shift was from an initial desire to replace the capacity for residential
transitional living rehabilitation to an intent to explore further what an extended
HomeLink capacity could deliver in supporting rehab at home.
Page 30

Page 31

4.21 It is suggested that this is a significant highlight from this work.  The investment
in time with a variety of stakeholders to iterate and develop the conversation
regarding what is needed for the future.  By holding the space of interim
arrangements, the conversation opened perspectives to what is
possible/appropriate. This has been incorporated into the proposed two-phase
approach outlined below. 
4.22 The HomeLink approach has enabled patients to continue with their goal
setting and rehabilitation as they transitioned home from NRU. HomeLink
commenced with the workforce who had been aligned to Craig Court testing out
a different approach to how they could work to support patients as they
transition from in-patients back to the community. This testing has highlighted
the need to consider how this approach can provide support geographically and
has highlighted the need to expand the workforce to be able to support the
needs of patients going through this redesigned pathway across Grampian. 
This includes the need to recruit a neuropsychologist to enhance the MDT, and
to develop a Clinical leadership role for the pathway to provide oversight and to
support more integrated working across professions. 
4.23 HomeLink has operated on a criteria basis ensuring that patients have goals in
place and then provide support for up to 12 weeks before referring onto
Horizons Out-patient rehabilitation centre and/or generalist community therapy
teams. The team ensure a person-centred approach for each individual patient,
with individual support plans that reflect their specific goals.  These are many
and varied ranging from accessing local community and activities of daily living. 
4.24 The individual goal setting focus on independence and reconnection offers
great benefits to the individual and their families and on a broader perspective
to wider community by reducing dependencies on services. 
Horizons Out-patient Rehabilitation Centre
4.25 The Horizons service provides a ‘one-stop shop’ out-patient approach (as
opposed to the in-patient approach at ARI and NRU) by a multi-disciplinary
team for adults across Grampian with a neurological condition and rehabilitation
need, providing assessment, review and rehabilitation.  This service was able
to demonstrate significant waiting lists especially for physiotherapy and this
correlated with one of the improvement ideas identified from the co-production
process; the augmentation of this capacity to address waiting list pressures. 
This would enable a more prompt out-patient follow-up on discharge.  In
addition, the need to build a further community response resource was also
quantified to enable out-patient staff to out-reach when appropriate to provide
continuity for patients in applying rehabilitation processes at home which aligns
with the Home First ethos.  This additionality would enable a more seamless
transition to home from in-patient/residential rehabilitation capacity as well as
from out-patient to independent living 
Approach to this review
4.26 The review has taken a co-design approach and has involved engagement with
patients, carers and staff using lived experiences to inform pathway design.
Engagement has taken many forms from 1:1 discussion, workshops, surveys
and attending user groups in a bid to gain a wide sample and offer different
means of participation. 
Page 31

Page 32

4.27 The co-designed approach enabled a vision statement (Appendix 1) to be
created and key themes for improvement to be captured. 
From the series of engagements, 23 change ideas were generated which were
then themed into 15 change action ideas (Appendix 2). 
4.28 These were then further refined resulting in 4 locally agreed objectives: 
• Enabled staff and patient in decision making;
• Equitable access to neuro rehabilitation care and support;
• Enabled and supported transition to independent living; and
• Patient pathway is seamless and timely. 
4.29 Additionally, a number of cross cutting themes emerged that needed to be
considered in each proposal including:
• upskilling of existing staff;
• increase in regional access to specialist care;
• more intensive and timely rehab;
• improved MDT and cross regional working;
• increased coordination and usage of communication tools; and 
• enhanced working with third and independent sector. 
5. PROPOSED MODEL - BLENDED MODEL INCORPORATING COMMUNITY
AND TRANSITIONAL LIVING ARRANGEMENTS 
5.1 Building on the improvement ideas generated and iterative consultation at the
Programme Delivery Group (PDG) a proposal was developed, and based on
current demand it was proposed that a total of 6 ‘beds’ were required in the
community. The PDG identified that a notional 3 virtual beds (person’s home)
and 3 community beds (i.e., physical beds based in a community setting) model
could deliver a Transitional Living Arrangement as opposed to a Transitional
Living Unit. The ‘virtual’ to physical bed ratio was difficult to determine as it is
based on patient need, and the consensus of the PDG was to commence with
this 3:3 ratio, reviewing and shaping within budget. 
5.2 Options for the 3 physical beds that were considered included the potential for
transforming a mothballed ward and existing staff space at Woodend Hospital
into an interim option of a step down from rehab. This being co-located or
adjacent to the Neurorehabilitation Unit was considered a benefit by the PDG. 
However, on conducting a feasibility study, initial costings indicate that capital
costs of this would be prohibitive (circa £1 million), alongside ongoing
discussions with NHSG regarding sustainability of their clinical sites. The
location also presented an environment that contradicted our strategic vision
around delivering services closer to home and broader home first principles and
the intent of transitional living support in a community setting. 
5.3 In addition, a block commissioned model had some initial market testing and
this identified a significant likely contract cost which would be significantly more
expensive than the Craig Court model, which would utilise a significant amount
of the financial envelope identified.  A block commissioned model is where a
set number of beds is funded on an ongoing basis and can include community
provision also.  This has the benefit of ensuring a certain amount of capacity is
always available when predicted needs are known. 
Page 32

Page 33

5.4 Therefore, the preferred model proposed by the PDG, given these
considerations and the positive experience of the testing of the HomeLink
approach, is to augment existing capacity in the MDT workforce to enhance
HomeLink delivery across Grampian. This would also see the creation of up to
three commissioned rehabilitation beds within available resources with a criteria
for delivering rehabilitation and transitional support in a homely setting. The
proposed first phase will strengthen the workforce and through evaluation of the
demand and patient needs during this period, this will inform the second phase
of investment, reviewing the ratio of these virtual to physical beds to determine
how the available funding can best be deployed to meet these needs. The
location of any commissioned beds and how we will most effectively deploy the
additional community based workforce will be determined following further
consultation with all Grampian HSCP colleagues. Further to this, we will
continue to explore market options with our contract's teams across Grampian. 
A Phased Approach to Proposals
5.5 The proposals are reliant upon the successful recruitment of additional staff. 
Given recruitment of staff has previously been challenging, we want to ensure
stability within the model and build in a review next year to review progress
against Phase 1. That review will allow us to consider alternative modelling
using commissioning (as detailed in Appendix 2) should it be required. 
Phase 1
5.6 Implementing an increase in therapy capacity within:
• NRU in order to increase time-critical rehabilitation capacity to optimise
rehab goal outcomes and minimise length of stay (therefore increasing flow
through and improved outcomes for patient and staff in NRU) and thereby
minimising costs associated with preventable demand. 
• HomeLink capacity, enabling basing of posts to take account of
geographical spread of patient group (e.g., exploring basing some capacity
in northern aspects of NHS Grampian) in order to; increase rehabilitation
capacity to optimise rehab goal outcomes and minimise length of stay
(therefore increasing flow through and improved outcomes for patient and
staff in the HomeLink capacity) and thereby minimising costs associated
with preventable demand.
• Horizons Rehabilitation Centre Out-patient capacity in order to increase
rehabilitation capacity to address historical waiting lists, improve access on
discharge and enable out-reach of out-patient staff where this creates more
seamless rehab experience for this patient cohort. Current data from June
23 highlighted 95 patients awaiting “routine” rehabilitation with longest wait
of 66 weeks to access treatment. Data collated on a three-monthly basis
has highlighted an upward trend on patient waiting times creating costs
associated with preventable demand.
• The benefits across all three areas of increasing therapy capacity will be
enhanced access and more intensive rehabilitation given in a timely
manner, will improve outcomes for people and support earlier transition
back into the community.
• The investment in additional staffing should support an enhanced flow from
acute to rehab, this, whilst meeting patient outcomes minimises costs
caused by preventable demand by having the patient in the right place, at
the right time.
• Risk assessment is a key part of discharge planning, if the patient is unable
to transfer directly home due to environmental or personal circumstance the
Page 33

Page 34

opportunity for step down to community rehab facilities or a spot purchase
bed will be undertaken. 
Phase 2
5.7 Based on current understanding it is proposed that phase 2 will be
implemented from quarter 3 in 2024 following an evaluation of Phase 1. 
5.8 Phase 2 would consider the commissioning of residential beds, if this is
evidenced as required from phase 1, and/or the further investment in existing
rehabilitation therapy teams to optimise service delivery, minimal length of stay
and pathway flow.   
5.9 Further key developments that have been scoped within the projected budget
to enhance neuro rehabilitation as part of Phase 2 is the creation of two distinct
roles to support learning, development and support via the creation of;
• Workforce Neuro Educator role, and;
• Information Hub coordination. 
5.10 These roles will be considered in the planning of phase 2. Although the roles
have been incorporated within the projected budget, a final decision on
recruitment will be weighed against the number of beds that is required to be
commissioned to support transitional living. This will require an ongoing review
of patient needs within this cohort and exploring whether all step-down
rehabilitation from the pathway can be delivered by a HomeLink team model.  It
is possible that these posts may need to be de-prioritised if not within financial
envelope for phase 2. 
5.11 Development of the job descriptions and key functions to maximise support to
staff, patients and carers are part of the implementation plan (see Appendix 2). 
Evaluation of impact of Redesign – Phase 1
5.12 The following metrics will be used to evaluate the impact of these proposals:
• Length of stay in NRU and Home Link;
• Goal setting and achievement data and/or Functional Independence 
Measure;
• Bed days awaiting the rehab pathway (both NRU and HomeLink
capacity) NB – this is a balancing measure;
• Delayed discharges from Acute wards and NRU, providing a further
balancing measure, to evaluate cross system impact of investment;
• Review complaints regarding waiting times for specialist rehab;
• Review the waiting list times for therapy for Home Link;
• Out-patient waiting times for Horizons service; and
• Patient and staff experience survey feedback. 
5.13 This will be a comprehensive evaluation, working with colleagues from
ACHSCP Strategy and Transformation, Health Intelligence and Public Health
Scotland, to evaluate change in flow whilst implementing remodelling of service
delivery. We note that the evaluation focus is not only focused upon patient
outcomes, but will be able to review impact cross system including associated
costs. It is proposed that the evaluation be provided to the meeting of the MIJB
in September 2024. 
Page 34

Page 35

6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
Recommendations made from the Neuro Rehab Pathway concur with 
Theme 2 - Home First from Partners in Care 2022-2032, this mirrors the
6 Principles of Good Rehabilitation as highlighted in Section 3.8 above,
focusing on providing care in a homely setting, reablement and recovery
supported by the most appropriately skilled staff group. 
(b) Policy and Legal
There are no direct legal implications arising from the recommendations
of this report. 
(c) Workforce and Financial 
The workforce have been integrated within the co-production process
throughout review. The intention is to continue this engagement
throughout the phased implementation period.
Changes to the model will encourage a more community facing
rehabilitation model which has received widespread positivity from staff
and patients during engagement. 
We are aware of recruitment challenges and mindful of the need to
balance our needs for developing services alongside sustaining other
services that may be impacted by staff moving into new roles. 
There is a great opportunity for role development within the additional
capacity roles created and developing new roles which enhance career
development opportunities supporting ACHSCP workforce strategic plan
objectives alongside Scottish Government policy objectives detailed in
3.8 (commitment 9) above, supporting both the recruitment and retention
of our workforce. 
The financial plan for phase 1 and phase 2 can be described in two
parts; 1) the financial envelope and 2) the spend plan.   
The financial envelope to enable the proposals for additionality detailed
earlier in this paper comes from two sources;
a) cessation of the Craig Court contract; and
b) Horizons vacant non-clinical posts (Centre Manager and admin
– currently vacant.) 
This totals £1,242,000 recurring funding, which covers the
implementation of the two phases. It is anticipated that the funding for
phase 2 will be maintained within medium term financial framework due
to be considered by the Integration Joint Board in March 2024. 
The costs proposed for phase 1 total £554,000. These on costs consist
of: 
• £172,000 (3.22 wte) invested in therapy staffing in NRU
(including a neuropsychologist);
• £115,000 (2.3wte) invested in HomeLink therapy staffing; and
• £267,000 (5.35wte) invested in Out-Patient Plus (Horizons)
capacity.
Page 35

Page 36

Investing this as proposed would leave £688,000 for the remainder for
investment in Phase 2. 
In phase 2, the potential further areas for investments, informed by the
evaluation are;
• further investment clinical posts in NRU;
• further investment in clinical posts in Horizons;
• new investment in non-clinical support posts; and
• commissioning 3 nursing/rehab beds (However, different models
of providing this capacity, if needed, will be explored in phase 1)
*any commissioning activity will be based upon evaluation of
demand. The geographical location of any beds will be agreed in
conjunction with all 3 partnerships based on demand data. The
ratio of virtual to physical beds will be reviewed with spending
based upon this blended model within budget e.g. may conclude
5:1 modelling is required. 
Further change ideas produced by the PDG will be costed, evaluated
and incorporated for inclusion into the implementation plan as
appropriate.
The PDG has been regularly appraised of the unacceptability of any
spend plan beyond the identified finance envelope. This group will
monitor recruitment as an area of high risk alongside balancing patient
need whilst having oversight of the recurring budget and ongoing staff
cost commitments. Indeed, the evaluation of phase 1 and planning of
phase 2 will include the requirement to seek to identify any opportunity
for recurring cost reductions to contribute towards ACHSCP and hosted
services financial recovery plans.  Consideration will also be given to the
impact of any investment against preventable demand and associated
costs elsewhere in the system. 
(d) Risk Implications and Mitigation
The delivery of the re-modelled hosted neurorehabilitation pathway has
been consulted with Stakeholders and clinical leaders across the three
Partnerships. As we move forward to the implementation phase further
engagement with key stakeholders will continue.  
The plan proposed for re-modelling will be met within the existing
financial envelope. The phased nature of planned delivery will enable
regular reviews re outcomes and implementation to ensure the redesign
remains within the available budget. Due to this, the financial risk is
deemed to be low.
We understand rehabilitation impacts on optimising recovery from
medical and surgical interventions (so optimises costs in other parts of
the pathway and avoids waste), reduces/manages complications
associated with health conditions/long term conditions, reducing length
of stay, and preventing re-admissions so cost avoidance, and beyond
the more acute phase of rehab, in terms of keeping people well and
independent for as long as possible and equipping people with self-
management approaches. 
Risk to Quality of service delivery/patient/staff experience are low given
controls in place through which highlight that activity data, demand and
patient experience with be monitored as key function of phase one.
Page 36

Page 37

Patient evaluation has been built into the HomeLink team to capture
feedback for learning and review. 
The re-modelling of pathway with additional staffing in existing services
at Horizons and HomeLink should create an enhanced experience for
patients and carers through more timely access. Considerations of
impact upon carers has been addressed within IIA and greater
connections with Commissioned Carer support organisations will provide
further mitigation. Risk of adverse outcome to staff, patients and carers
within this pathway following the re-modelling is low. 
Communication and engagement with all three Partnerships, has
ensured that recommendations to progress the review have gained
understanding and support. This position creates a low risk for
reputational damage. In terms of risk to hosted/commissioned services,
risks have been minimised due to co-design approach whereby all
Partnerships have been invited to participate and have been consulted
with.  With changes in the City HSCP project team and some of the key
personnel in the other HSCPs, meetings are taking place to bring these
key stakeholders up to date with progress and we recognise the need to
continue to work collaboratively as we progress through the two phases
of implementation to ensure best outcomes right across Grampian. 
The plan to formally commission beds in Phase 2 to provide transitional
living support will be based upon data and will be supported by the
shared City and Aberdeenshire Council Contracts team. There are no
commissioned contracts in place at present that are reliant upon any
funding or support from Neuro–rehabilitation pathway. 
(e) Property
There are no direct property implications arising from the
recommendations of this report. 
(f) Equalities/Socio Economic Impact
An Impact assessment has been completed (Appendix 4). Costs to
implement the changes will be met through the existing financial
envelope for neurorehabilitation through redesign of the existing pathway
model for neurorehabilitation and transitional support. The budget for
phase 2 spending will be maintained within the medium term finance
framework.
Stakeholders including carers, patients and families have been consulted
as part of co-design process and have inputted their needs for
consideration. 
The phasing of project delivery will ensure that oversight of recruitment
activity is managed and balanced in terms of budget available for
commissioning activity.
Although not in the scope of this review, one area of need identified
through this process through engagement with colleagues working
across other parts of the wider pathway has been around practice
education capacity within the acute part of the neuro pathway for nursing
and an approach will be made to Friends of Neuro to consider funding
this. 
Page 37

Page 38

(g) Climate Change and Biodiversity Impacts
There are no direct environmental implications arising from the
recommendations of this report. Considerations have been re-use of
existing workplaces and use of community facilities to support individual
rehabilitation goals. 
(h) Directions
There are no directions arising from the recommendations of this report. 
(i) Consultations
Significant discussion across the engagement activity undertaken in
planning this redesign was used to explore achieving an appropriate
person-centred balance in supporting individuals in rural settings using
digital technology such as Near me video calls and working with the local
HSCP rehabilitation teams with enhanced knowledge and clinical
oversight provided by virtual MDT with specialist team colleagues. 
This is designed to support both a Home First and sustainability strategic
objectives of the IJB. 
7. CONCLUSION 
7.1 Aberdeen City Health and Social Care Partnership (ACHSCP) host Neuro
rehabilitation for Grampian. This means that Aberdeen hold responsibility
for the delivery of this service on behalf of NHS Grampian, Aberdeenshire
Health and Care Partnership and Moray Health and Social care
Partnership. A decision was made by Aberdeen City IJB in October 2023
to approve the implementation of a two phased approach to redesign. 
7.2 A staged approach to implementation of the change ideas will ensure
optimum use of the available resources.  
In phase 1, to develop the community model and further understand the
balance needed between this and the need for commissioned beds to
support the transitional support needs for patients unable to be
supported in their own home. Within phase 2, a review of the impact of
investment and look to invest further in community rehabilitation. The
decision and balance of commissioning a bed base in tandem with further
community investment including new roles will be made within existing
budget with ratio of spending based upon evaluation. 
7.3 An update report on the evaluation will be taken back to the Aberdeen
City IJB in September 2024, which will be shared across Aberdeenshire
and Moray Partnerships thereafter. 
7.4 ACHSCP continue to engage with a range of stakeholders i.e. patients,
families, staff to implement changes, and continuing to work in
partnership with Aberdeenshire and Moray HSCPs. 
Author of Report: Tracey McMillian
Background Papers:  Appendix 1: Vision Statement  
Appendix 2: Improvement Ideas 
Appendix 3: Implementation Plan 
Appendix 4: EQIA
Ref: 
Page 38

Page 39

APPENDIX 1 
Item 6.
Page 39

Page 40

APPENDIX 2 
Item 6.
Page 40

Page 41

APPENDIX 3  Item 6.
Page 41

Page 42

APPENDIX 4
ACHSCP Impact Assessment  – Proportionality and Relevance
Name of Policy or Practice being
developed
Neurological Rehabilitation Review
Name of Officer completing
Proportionality and Relevance
Questionnaire
Rae Flett (Project Manager)
Date of Completion 08/09/23
What is the aim to be achieved by
the policy or practice and is it
legitimate?
To create a streamlined and responsive person-
centred neurological rehabilitation service. 
Those accessing this Pathway would generally
be considered as having a Disability as defined
by the Equality Act 2010.
What are the means to be used to
achieve the aim and are they
appropriate and necessary?
The overall aim of this Review is to ensure that
we have a service that will meet the person-
centred neds of those who require neurological
rehabilitation services. 
In order to determine what this should look like a
Project Delivery Group was formed which
included key stakeholders with relevant
expertise of the needs of patients and
individuals with lived experiences {former
patients and their carers} to collate ideas of how
to achieve this aim. This was carried out through
holding workshops and using a co-design
approach to ensure all voices are heard.
A number of recommendations have been
submitted to IJB to approve the remodelling of
the Neuro Rehab Pathway, the change ideas
were generated through engagement with a
range of stakeholders, including patients and
their families.
If the policy or practice has a
neutral or positive impact, please
describe it here.
A number of positive impacts have been
identified which should be realised by the
reviewed service. These are outlined as
follows;
Protected Characteristics
Disability – This service will improve access for
patients, receiving patient centred care for their
rehabilitation creating the ability to reach more
people across Grampian. Disabled people, their
carers and families accessing Neurological
Acute wards 204 / 205 at ARI, Neuro
rehabilitation Unit at Woodend, HomeLink
concept users and users of Horizon
rehabilitation services will be positively impacted
by an increase in MDT staffing to ensure a
timely and intensive rehabilitation service can be
offered. 
Age – This service is for adults (over 18) who
require Neurological rehabilitation. Young
people (under 18) are supported via RACH. The
service will be available to all adults based on
patient needs and will have a positive impact.
Race – The service has considered how
translation services will be accessed from
community settings and will utilise the Language
Item 6.
Page 42

Page 43

APPENDIX 4
Line to ensure that there is no disadvantage to
using a community-based model.
Sex – The creation of the community-based
model, which focuses on individual goals,
ensures that there will be no gender bias within
the delivery of the service.
A neutral impact has been identified at this stage
in relation to the other protected characteristics.
Marriage and Civil Partnership – the service
recognises the support from potential carers and
so a neutral impact has been identified at this
stage.
Gender Reassignment – the service is patient
centred and goals are individual. A neutral
impact has been identified at this stage 
Pregnancy and Maternity – the services
recognises links with other team and their
involvement should they be required. A neutral
impact has been identified at this stage.
Religion and belief – the service is patient
centred and goals are individual. A neutral
impact has been identified at this stage
Sexual orientation - the service is patient
centred and goals are individual. A neutral
impact has been identified at this stage
Fairer Scotland Duty
This service will be available to patients based
on individual need. The proposed ‘HomeLink’
model will enable patients to receive support in
their own home which minimises the financial
impact and potential challenges experienced by
those who have a low income and / or are
experiencing material deprivation, and their
Carers, from travelling to appointments for their
treatment. 
There may be occasions due to a patients living
environment where it is not appropriate for the
Homelink concept to be implemented.
Therefore, a commissioned bed may need to
considered as an interim option. The
recommendations give the flexibility for this to be
pursued.
The proposed model will collaborate with
Aberdeenshire and Moray colleagues to
determine the most appropriate means of
ensuring the service is available to reach more
people across Grampian. Whilst no negative
impacts have been identified at this stage this
will be monitored during the phased
implementation.
Health Inequalities
No additional impacts have been identified in
relation to Healthy inequalities.
Carers
Carers as part of discharge planning are
consulted as per Carers (Scotland) Act 2016
legislation. This ensures that the individual
needs of Carers are considered. Additionally,
the pathway will ensure that staff have an
awareness of their local commissioned Carer
Page 43

Page 44

APPENDIX 4
Support organisation and know where to
signpost to.  
Human Rights
There will be a positive impact in relation to
‘Article 8 – The right to respect for private and
family life, home and correspondence’ – The
proposed model will enable patients to return
home to their own homes to receive their
treatment enabling them to return to family life. It
will also support a person-centred approach
which has a further positive impact. 
Is an Integrated Impact
Assessment required for this
policy or decision (Yes/No)
Yes – this will be reviewed in Phase 2 
Rationale for Decision
NB: consider: -
• How many people is the
proposal likely to affect? 
• Have any obvious negative
impacts been identified?
• How significant are these
impacts? 
• Do they relate to an area
where there are known
inequalities?
• Why are a person’s rights
being restricted?
• What is the problem being
addressed and will the
restriction lead to a reduction
in the problem?
• Does the restriction involve a
blanket policy, or does it allow
for different cases to be
treated differently?
• Are there existing safeguards
that mitigate the restriction?
Potential patient group, their carers and families
within Neuro Acute wards 204 / 205 at ARI,
Neuro rehabilitation Unit at Woodend, HomeLink
concept users and users of Horizon
rehabilitation services will be positively impacted
by an increase in MDT staffing to ensure a more
timely and intensive rehabilitation could be
offered. 
No negative impacts identified 
Significant positive impact to those neuro
patients requiring to move through the pathway
to have rehab have been identified as outlined
above.
Carers will be positively impacted in that support
is available and will be highlighted better through
the pathway.
No one’s rights will be restricted by this. The
focus of changes includes the improvement of
person-centred care process which includes;
working in collaboration with patients and their
families to achieve the best outcomes for the
patient. 
Decision of Reviewer Agreed
Name of Reviewer  Lynn Morrison
Date 13/09/23 
Page 44

Page 45

REPORT TO: MORAY INTEGRATION JOINT BOARD ON 25 JANUARY 2024 
SUBJECT: MEMBERSHIP OF BOARD AND COMMITTEES 
BY:  CORPORATE MANAGER 
1. REASON FOR REPORT 
1.1 To inform the Board of changes to Membership of the Moray Integration Joint
Board (MIJB), Audit, Performance and Risk (APR) Committee and Clinical and
Care Governance (CCG) Committee.  
2. RECOMMENDATION 
2.1 It is recommended that the Moray Integration Board (MIJB) notes: 
i) the Chair and Vice-Chair are due to rotate on 1 April 2024; 
ii) the requirement to appoint a new Chair of the APR Committee; 
iii) the update regarding vacancies in National Health Service (NHS)
voting membership and Service User Stakeholder position; 
iv) the appointment of Deirdre McIntyre as the new NHS Staff
Partnership representative; and 
v) the updated membership of Board and committees attached at
APPENDIX 1. 
3. BACKGROUND 
3.1 The Public Bodies Joint Working (Scotland) Act 2014 (“the Act”) and the Public
Bodies (Joint Working) (Integration Joint Boards) (Scotland) Order 2014 (“the
Order”) make provisions about various matters including the membership of the
MIJB. As a minimum this must comprise voting members nominated from the
NHS Board and Council; co-opted non-voting members who are holders of key
posts with the NHS and Council or the MIJB; and co-opted non-voting members
who are representatives of groups who have an interest in the MIJB. There is
flexibility to appoint additional non-voting members as the Board sees fit. The
Moray Health and Social Care Integration Scheme (“Integration Scheme”)
outlines certain agreed provisions re membership (and includes the specific
provisions taken from the Act and the Order).
Item 7.
Page 45

Page 46

3.2 At the meeting of the Board on 29 September 2022 (para 7 of the minute
refers) the Board approved the rotation of Chair from a Council Member to a
Health Board Member from 1 October 2022, for 18 months.   
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 As the current Chair of the Board, Mr Dennis Robertson will now take on the
role of Vice-Chair with effect from 1 April 2024.   
4.2 As the current Vice-Chair of the Board, Councillor Tracy Colyer will now take on
the role of Chair with effect from 1 April 2024. 
4.3 The Chair and Vice-Chair of the Board is allocated on a rotational basis every
18 months.  The next rotation is due on 1 October 2025. 
4.4 Due to the rotation of Chair/Vice-Chair of the Board there is a requirement to
appoint a Health Board voting member as Chair of the APR Committee to take
up post with effect from 1 April 2024.  This cannot be the Chair or Vice-Chair of
the Board. 
4.5 The Chair of the APR Committee requires to be appointed from a member of
the organisation which does not Chair the Board.  As a Council Member is the
incumbent Chair of the Board, the new Chair of APR Committee must be a
Health Board voting member. 
4.6 The current Health Board members of APR Committee are Sandy Riddell and
Derick Murray, and either would be eligible for appointment of Chair of APR
Committee. 
4.7 Derick Murray is the current Chair of the Clinical and Care Governance
Committee.  This committee is required to be chaired by a NHSG voting
member.  No further action is required. 
4.8 Following two resignations from the NHS Grampian Board a realignment of
NHS Grampian members on Integration Joint Boards (IJBs) in Aberdeen City,
Aberdeenshire and Moray took place to manage these vacancies in IJB
membership until their replacements are appointed by Scottish Government. 
As of 17 October 2023, Professor Bhattacharya moved to Aberdeen City IJB.
This means MIJB is currently reduced to 3 NHS voting members. 
4.9 Ms Thatcher has resigned from her position as Service User Stakeholder. The
recruitment process to fill the vacancy is underway. 
4.10 Deirdre McIntyre replaces Stuart Falconer as the NHS Grampian Staff
Representative Stakeholder Member from 1 December 2023. 
Page 46

Page 47

5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Partners in Care 2022-2032”
Effective governance arrangements support the development and
delivery of priorities and plans. 
(b) Policy and Legal
The Board, through its approved Standing Orders for Meetings,
established under the Public Bodies (Joint Working) (Integration Joint
Board) (Scotland) Order 2014, ensures that affairs are administered in
accordance with the law, probity and proper standards. 
(c) Financial implications
There are no financial implications arising as a direct result of this report. 
(d) Risk Implications and Mitigation
There are no risk implications arising as a direct result of this report. 
(e) Staffing Implications
There are no staffing implications arising as a direct result of this report. 
(f) Property
There are no property implications arising as a direct result of this report. 
(g) Equalities/Socio Economic Impact
An Equalities Impact Assessment is not required as the report is to
inform the Board of changes required to membership of the Board and
CCG Committee. 
(h) Climate Change and Biodiversity Impacts
None arising from this report. 
(i) Directions
None arising from this report. 
(j) Consultations
Consultation on this report has taken place with Chief Officer – Health
and Social Care Moray and Caroline O’Connor, Committee Services
Officer, Moray Council, who are in agreement with the report. 
6. CONCLUSION 
6.1 This paper sets out the position in relation to the membership of MIJB. 
Author of Report:  Isla Whyte, Interim Support Manager
Background Papers:  None
Ref:   
Page 47

Page 48

APPENDIX 1
Moray Integration Joint Board – as at 15 December 2023 
Moray Integration Joint Board 
4 Council voting members Tracy Colyer (Vice-Chair)
Ben Williams
Peter Bloomfield
Scott Lawrence
4 NHS Grampian voting members Dennis Robertson (Chair)
Derick Murray
Sandy Riddell
Vacancy
Third Sector Stakeholder  Graham Hilditch
NHS Grampian Staff Representative Stakeholder
Member
Deirdre McIntyre
Carer Stakeholder  Ivan Augustus
Service User Stakeholder Vacancy
Moray Council Staff Representative Kevin Todd
Chief Officer Professional Simon Bokor-Ingram
Chief Social Work Officer Tracy Stephen
Lead Nurse  Jane Ewen
GP Lead  Dr Robert Lockhart
Dr Malcolm Simmons
Non Primary Medical Services Lead Prof Duff Bruce
Additional Member  Elizabeth Robinson 
Audit, Performance and Risk Members
(note chair needs to be alternate partnership member to the Chair of MIJB)
2 Council voting members  Ben Williams
Scott Lawrence (Chair)
2 Health Board voting members  Sandy Riddell
Derick Murray
Third Sector Stakeholder  Graham Hilditch
NHS Grampian Staff Representative Stakeholder
Member 
Deirdre McIntyre 
Clinical and Care Governance Members 
2 Council voting member Cllr Peter Bloomfield 
Cllr Scott Lawrence
2 Health Board voting member (Chair) Derick Murray (Chair)
Vacancy
Carer Stakeholder  Ivan Augustus
Service User Stakeholder Vacancy 
Third Sector Stakeholder Graham Hilditch
Moray Council Staff Representative Kevin Todd
Chief Officer Professional Simon Bokor-Ingram
Chief Social Work Officer Tracy Stephen
Lead Nurse  Jane Ewen
Item 7.
Page 48

Page 49

APPENDIX 1
GP Lead  Dr Robert Lockhart and Dr
Malcolm Simmons
Non Primary Medical Services Lead Prof Duff Bruce
Additional Member  Elizabeth Robinson 
Page 49

Page 50

REPORT TO: MORAY INTEGRATION JOINT BOARD ON 25 JANUARY 2024 
SUBJECT: LOCALITY PLANNING UPDATE 
BY:  INTERIM DEPUTY HEAD OF SERVICE 
1. REASON FOR REPORT 
1.1 To inform the Board on the work done to date in relation to the Health and
Social Care Moray Locality Planning model. 
2. RECOMMENDATION 
2.1 It is recommended that the Moray Integration Joint Board (MIJB): 
i) notes the progress made on locality plans since the previous report
on 30 March 2023; and 
ii) agrees that further progress reports be brought to the MIJB on a six
monthly basis. 
3. BACKGROUND 
3.1 The Public Bodies (Joint Working) (Scotland) Act 2014 section 29(3)a requires
Integration Authorities across Scotland to establish Health and Social Care
localities within their areas. Moray is divided into four localities to support the
local implementation of the MIJB Strategic Plan. 
3.2 Locality planning provides a framework for how the MIJB intends to improve
health and wellbeing within specific geographic areas. It is anticipated that
locality planning will build upon the insights, experiences and resources within
localities, support improvements in local networks, enable development of
robust and productive professional relationships and improve the health and
wellbeing outcomes. Most importantly, locality planning will support citizens and
communities to support themselves. 
3.3 Each locality plan incorporates a community led approach, empowering those
living and working within a locality to play an active role in identifying the
priorities for health and social care in each locality, and to shape the delivery of
services for the future.  Each plan is supported by locality profiles which provide
demographic, public health and inequalities overviews for each geographic
Item 8.
Page 50

Page 51

area.  These profiles are used to help facilitate decisions regarding service
planning within the localities. 
3.4 The four Moray localities and their respective locality managers are:
• Forres and Lossiemouth; Iain Macdonald
• Elgin; Lesley Attridge
• Speyside and Keith; Cheryl St Hilaire
• Buckie, Cullen and Fochabers; Laura Sutherland 
3.5 A previous report was submitted to the Board on 30 March 2023 outlining
progress in relation to the locality planning process (para 10 of minute refers). 
3.6 The monitoring and further development of locality plans are now embedded
within locality based discussion groups and at the Health and Social Care
Moray, Operational Management Team (OMT) meetings. 
3.7 Locality Managers use a strength and asset based approach to support the
development of their respective locality plans. Trust based relationships are at
the heart of developing locality networks; each locality plan aims to recognise
citizens, health and social care practitioners and the varying communities’
strengths and assets. Ultimately creating plans which matter to each
community. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 All four localities have locality plans in place and these are included alongside
this report as appendices 1 (Forres and Lossiemouth Locality), 2 (Elgin
Locality), 3 (Keith and Speyside Locality) and 4 (Buckie, Cullen and Fochabers
Locality). 
4.2 The respective locality plans are being progressed at differing paces, however
a shared approach based on four key themes is being used: 
• Evidence driven – all four locality plans share the same format for their
locality profiles and the same core health and social care data.
Additional data is then sought to allow a deeper analysis into specific
themes/topics. Data is updated on a regular basis. 
• Community engagement and consultation – all four locality plans utilise
community engagement and consultation information to inform the
setting of priorities and the monitoring of action plans. Locality managers
work closely with colleagues in Children’s Service Planning and the
Moray Council Communities team to share appropriate engagement and
consultation responses to minimise duplication of effort, maximise
resources, and coordinate priority setting. 
• Practitioner engagement and consultation – all four locality plans utilise
feedback from practitioners to inform priority setting and the monitoring
of actions plans. 
• National and regional drivers, and sharing of good practice – all four
locality plans monitor national and regional good practice examples to
support the development of locality priorities.
Page 51

Page 52

4.3 Each locality planning structure has three component parts: 
• The Oversight group – a representative group of local community
members and practitioners who oversee the development and
monitoring of the locality plan. 
• The Multi Disciplinary Team – this component focuses on the practice
and quality of ‘case specific’ health and social care support to the
residents living within the locality. 
• The Network – this component focuses on how we share contact details
and general information between the broad group of practitioners who
provide health and social care support to the people living within the
locality. 
4.4 The Health and Social Care Moray Locality Planning model allows localised
planning and the opportunity to facilitate ‘tests of change’ within one locality
that, if appropriate, can be scaled up to other localities. Thus promoting a
learning and development culture. There are also many opportunities to share
learning, to and from, other Health and Social Care Partnerships within
Grampian and those further afield, ensuring that we remain outward looking. 
4.5 The potential continues to exist to further connect the locality work taking place
within Children’s Service Planning and within the locality work being led by the
Moray Council Communities Team. Progress has been made and discussions
are ongoing between senior managers leading on each model to ensure a
joined up approach is taken wherever possible. With the current financial
challenges facing all services there is an increased need to ensure best use of
resources.   
4.6 Members of the Senior Management team and Service Managers recently met
with Scottish Government colleagues from the Getting it Right For Everyone
(GIRFE) Team. This led to a bid being presented to the Scottish Government
for Health and Social Care Moray to become a GIRFE Pathfinder Project. The
bid was successful and Health and Social Care Moray were confirmed a
Pathfinder Project on the 18 November 2023. Locality planning will be integral
to achieving the values and principles set out within GIFRE. 
4.7 Members of the Senior Management Team and Locality Managers recently met
with Scottish Government colleagues to discuss the current National Localities
Guidance (2015); opportunities for refreshing this guidance, and how locality
planning may align, or otherwise, with National Care Service design. There was
an opportunity to highlight the good work taking place across Moray; this was
well received and was acknowledged at a national level.   
4.8 Localities cannot operate in isolation and there are some excellent examples of
how within Moray we can maintain a central overview whilst delegating decision
making and responsibility to local managers and teams, and most importantly
communities. This is perhaps best seen in how we have developed our multi
disciplinary team meetings at both a central and local level to ensure the most
vulnerable people are receiving the support they require. 
Page 52

Page 53

Specific Locality Updates 
4.9 Forres and Lossiemouth   
• A locality oversight group is now well established in both the Forres and
Lossiemouth areas; the groups have strong community and practitioner
representation. 
• The role of the Multi Disciplinary Team (MDT) has been reviewed
through a ‘How Good is our MDT’ evaluation tool; with the aim of further
strengthening MDT working within the locality. 
• Improvements in data collection at a locality level continues to progress
an evidence based approach to determine locality priorities and measure
outcomes. 
• The Social Prescribing model is now well embedded within the Forres
Health and Care Centre and the Moray Coast Medical Practice building
in Lossiemouth.   
• Progress in relation to the Forres and Lossiemouth Locality priorities are
outlined in Appendix 1. Mitigating Actions following the closure of the
Burghead and Hopeman branch surgery premises have been added to
the plan as appropriate. 
• Plans are in place to engage with the Forres and Lossiemouth
communities in relation to the current provision of health and social care
services and how these services can be improved. GP practices will
work alongside the Locality Manager to undertake this work on a themed
topic basis. 
• Digital Health Institute work in relation to the Living Lab 3 Care in Place
is progressing well. Testing of the Personal Data Store with 10 Unpaid
Carers with a view to increasing sample to 100 Unpaid carers in 2024. 
• Both Forres and Lossiemouth areas intend to make a case for a
scheduled M-Connect service within their respective areas as part of the
next expansion of this service. 
• All mitigating actions in relation to the closure of the Burghead and
Hopeman branch surgeries have been implemented except the
introduction of a mobile clinic. Priority has instead been put on the
development of an enhanced community nursing team to support the
most vulnerable people within their own homes.     
• The Forres and Lossiemouth Locality Plan will be updated for the period
2024/25 with completed actions archived and new actions added as
appropriate. This plan will be submitted to the MIJB as part of the next
Locality Plan Update report due to be submitted to the IJB on 
Page 53

Page 54

4.10 Elgin 
• The Locality Oversight Group has met once and a further meeting is
currently being planned, the vision for it to be well supported with
community and practitioner representation. The role of the Multi
Disciplinary Team is well established within both Elgin practices and is
supported and attended by a range of professionals. Progress will
include a review with the aim of further strengthening this function. There
is currently and MDT survey being adapted to capture feedback on how
the role of MDT’s within the Elgin locality are working and what can be
further improved on. 
• A huge amount of work has been undertaken to develop current and
longitudinal local data thus enabling an evidence based approach to
determine locality priorities. The priorities for Elgin will be further
developed through the Locality Oversight Group. 
• A focused piece of work was carried out between GP practice and
Arrows around alcohol related deaths based on population data of the
practice in Elgin. The outcome of the work has resulted in pathways
being developed to better support flow of people in and out of the Arrows
service and linking back to the GP. 
4.11 Keith and Speyside   
• The Locality Oversight Group is established, and allows for a mix of
community and practitioner representation dependant on particular
actions and pieces of work being undertaken. 
• The role of the Multi-Disciplinary Team continues to work well across our
4 practices and 2 Community Hospitals in the Keith and Speyside locality
and is well supported, with the ability and flexibility to call on a range of
other professionals as required around specific matters. To build on our
multi-disciplinary approach we are exploring opportunities for joint
training amongst the various practitioner groups, which includes an
upcoming session with our Care at Home colleagues to encourage
information and knowledge sharing and collaboration opportunities for
the benefit of patients and service users. 
• We continue to utilise available data to enable an evidence based
approach to determine locality priorities, ensuring that a holistic
approach is also taken into consideration; Working with and utilising
feedback and data from other professionals and groups internally and
externally. 
• Following on from our first ‘Let’s talk Health, Communities and
Wellbeing’ in Keith last year, we have subsequently run an event in the
Keith secondary school for pupils to support prevention and awareness
through intergenerational opportunities in the Locality. We had hoped to
host an event in Speyside this year which has now been postponed until
2024. 
Page 54

Page 55

• The Fleming Hospital is currently being utilised as a Community Health
Services hub and is offering a multitude of services to support the local
communities closer to home including retinal screening, repertory clinics,
podiatry, child immunisations, baby support classes and vaccinations to
name but a few. As part of HSCM efficiency savings we are also looking
at what staff training can be delivered at Fleming and that would prevent
staff travelling to Aberdeen, with a couple of manual handling courses
having been delivered in October successfully. 
4.12 Buckie, Cullen and Fochabers 
• Health and Social Care intelligence has been collated and evaluated,
alongside locality profiles, existing plans i.e. Children Services Plan,
Moray LOIP and Buckie Locality Plan 2019 - 29, which have identified
cross-over themes and trends that have helped set potential priorities.
The Locality Manager recognises that there has already been sufficient
community engagement carried out and that any further engagement
would unlikely result in new information at this time. In addition to this
local engagement has recently been undertaken at the Winter
Vaccination Clinics, which includes a self-complete health check
accompanied by a signposting and service information sheet.  The
engagement addresses where and how the community access health
and wellbeing information, what community services and groups are
accessed and what services are missing.  Preliminary results are
positive with 82% of people who completed the self-check stating that
they were more aware of services that support their Health and
Wellbeing than before.    
• As part of a Moray Wide collaboration, Teams in Buckie are fully
represented at a daily system oversight multi-disciplinary team meeting
which endeavours to ensure equitable, safe and qualitative distribution of
available health and social care resources which supports Home First
Principles. 
• A locality oversight group is in the process of being established,
however, the ambition is to keep this less structured and reduce the
need for physical meetings. The Locality Manager sees their role as one
who integrates into existing groups and will collect feedback as the
locality plans are developed. 
• A range of Health and Wellbeing initiatives are being delivered to support
communities closer to home, which include: 
o Health Walks are supported within the community. 
o A healthpoint outreach service is available throughout the
community. NHS Grampian healthpoint works proactively to tackle
health issues relating to self-care offering free information and
advice on a number of health concerns for professionals and
members of the general public.  
o Working collaboratively with Moray Food Plus; Foodskills and
Nourish sessions have been established within the Buckie ASG.  
o Implementation of the Social Prescribing model is in progress. 
Page 55

Page 56

• A first draft of the Buckie, Cullen and Fochabers Locality Plan has been
compiled and will be further informed once the community engagement
at the Winter Vaccination Clinics has been completed and evaluated. 
Performance and Evaluation
4.13 Both Moray Council and NHS Grampian Performance and Evaluation teams
are active and valuable stakeholders in the development of the locality planning
process. This has ensured they are kept up to date and available to provide
guidance as the process progresses. They will remain involved to help ensure
actions are appropriately monitored and any impact can be sufficiently
evidenced. 
4.14 Locality Planning Groups will be accountable to the MIJB, providing regular
updates on the locality action plan implementation and performance. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Moray Partners in Care 2022 – 2032”
The aims of Locality Planning in Moray is to contribute to the
delivery of the MIJB Strategic Plan as well as the NHS
Grampian Plan for the Future and Moray Council Corporate
Plan. 
(b) Policy and Legal  
None directly associated with this report. 
(c) Financial implications
At present there are no direct financial implications to locality planning. It
is hoped that opportunities to combine resources and work more
effectively will lead to greater efficiencies. Deliberation will need to be
given to how services are commissioned at a locality level and its impact
on acquisition of services. 
(d) Risk Implications and Mitigation
There are no specific risk implications to this report. 
(e) Staffing Implications
There are no specific staffing implications to this report. 
(f) Property
There are no property implications to this report. 
(g) Equalities/Socio Economic Impact
There are no changes to policy as a result of this report. 
(h) Climate Change and Biodiversity Impacts
There are no changes to policy as a result of this report. 
(i) Directions
None directly arising from this report. 
Page 56

Page 57

(j) Consultations
Lesley Attridge, Locality Manager (Elgin), Health and Social Care Moray
Cheryl St Hilaire, Locality Manager (Keith & Speyside), Health and
Social Care Moray
Laura Sutherland, Locality Manager (Buckie & Fochabers), Health and
Social Care Moray
Simon Bokor-Ingram, Chief Officer, Health and Social Care Moray
Sean Coady, Head of Service, Health and Social Care Moray
Tracy Stephen, Chief Social Work Officer
Fiona Robertson, Chief Nurse, Health and Social Care Moray
Audrey Steele-Chalmers, AHP Professional/Sector Lead, Health and
Social Care Moray
Robert Lockhart, Primary Care Clinical Lead, Health and Social Care
Moray
Malcolm Simmons, Primary Care Clinical Lead, Health and Social Care
Moray
Bob Sivewright, Finance Manager, NHS Grampian
Deborah O’Shea, Interim Chief Financial Officer, HSCM 
6. CONCLUSION 
6.1 Locality planning demonstrates how the MIJB’s Strategic Plan is being
implemented locally, and how localities will respond to local needs and
issues. 
6.2 A further report will be presented to the MIJB on 29 August 2024. 
Author of Report: Iain Macdonald, Locality Manager (Forres & Lossiemouth) 
Background Papers:  Appendix 1 – Forres and Lossiemouth Locality Plan 
Appendix 2 – Elgin Locality Plan 
Appendix 3 – Keith and Speyside Locality Plan 
Appendix 4 – Buckie Cullen and Fochabers Locality Plan 
Ref: 
Page 57

Page 58

1 
APPENDIX 1 
FORRES AND LOSSIEMOUTH LOCALITY ACTION PLAN 2023/24 
Local Priority 1
To improve the mental health and wellbeing of the local population. 
Action Measure of Success Desired Outcome Timeline Progress
%
Seek more detailed information on causes
of death rate 18 - 44yr olds.
Information accessed
and shared with the
Locality Oversight
Group.
Increase in access to preventive
mental health services. 
Increase in information available
to local practitioners.
June -
2023
100%
Review bed occupancy days due to
mental health and reasons for this.
Information accessed
and shared with the
Locality Oversight
Group.
June -
2023
100%
Facilitate a focused session with key
locality stakeholders to determine
additional preventive approach's to
support positive mental health and
wellbeing.
Preventative approaches
identified and
information document
developed and shared
with practitioners.
Sept -
2023
20% 
Item 8.
Page 58

Page 59

2 
APPENDIX 1 
Local Priority 2
To reduce the health impact of drugs and alcohol use within the local population. 
Action Measure of Success Desired Outcome Timeline Progress
%
Gather further information in relation to
drug and alcohol related hospital
admissions for Forres and Lossiemouth
population. 
Information accessed
and shared with the
Locality Oversight
Group.
Reduction in the number of
hospital admissions as a result
of drug or alcohol use. 
Increase in information
available to local practitioners.
June -
2023
100%
Review current services available locally
and Grampian wide. 
Services reviewed.  June -
2023
100%
Share updated information and
services available with GPs and Health
and Social Care Professionals. 
Information document
developed and shared
with local practitioners.
June -
2023
20%
Page 59

Page 60

3 
APPENDIX 1 
Local Priority 3
Further develop and promote prevention and self-care approaches within the locality. 
Action Measure of Success Desired Outcome Timeline Progress
%
Falls - Review, refresh and promote
frailty information.
Information accessed and
shared with the Locality
Oversight Group and local
practitioners.
Reduction in the number of
falls, particularly in those
requiring hospital admission.
June – 
2023
90%
Falls - Review the role of the Forres
Neighbourhood Care Team and
Community Response Team to
encompass a falls response.
Roles of team reviewed
and information shared with
local practitioners.
July – 
2023
100%
Social Prescribing - Complete current
test of change taking place within
Forres and scale up to include
Lossiemouth.
Test of change completed
and evaluated.
Increase in the number of
individuals who are redirected
towards a non-clinical based
service/intervention. 
Increase the range of provision
available within the locality.
April –
2023
100%
Social Prescribing - Develop a model
of provision encompassing a range of
services available within Forres and
Lossiemouth.
Test of change
mainstreamed into core
provision.
Sept –
2023
100%
Identify gaps within current range of
services available within Forres and
Lossiemouth.
Gaps noted and actions
identified to address these
where possible.
Sept – 
2023
50%
Review preventative approaches to
addressing the 5 most prevalent long
term conditions: Asthma for under
65’s and COPD, diabetes, heart
disease, & cancer for over 65’s.
Review of preventative
approaches undertaken
and information shared with
the local practitioners.
Reduction in the requirement for
hospital based admissions.
March – 
2024
0%
Page 60

Page 61

4 
APPENDIX 1 
Ensure an individual’s finance is
considered in all preventive
conversations through the use of
Making Every Opportunity Count
(MEOC) tool.
Adoption of the MEOC tool
by all services involved with
Social Prescribing model.
Increase citizen’s awareness of
financial supports.
Jun – 
2023
100% 
Local Priority 4
Improve Multi-Disciplinary Team working
Action Measure of Success Desired Outcome Timeline Progress
%
Review current models of Multi-
Disciplinary Team working within Forres
and Lossiemouth.
Review undertaken. Improvement in Multi-
Disciplinary Team working
within Forres and Lossiemouth
areas.
Jun – 
2023
100%
Evaluate 'How Good Is Our MDT
Working' within Forres and
Lossiemouth.
Survey staff on effectiveness
of current MDT working
completed.
Sept –
2023
90%
As part of evaluation review feedback
already received from patients and
lessons learned.
Feedback reviewed and
shared.
Sept –
2023
50%
Discuss and agree any improvements
to current MDT model.
Information reviewed and
actioned. 
Sept –
2023
50% 
Page 61

Page 62

5 
APPENDIX 1 
Local Priority 5
Increasing access to in-hours minor injuries assessment and treatment.
Action Measure of Success Desired Outcome Timeline Progress
%
Promote discussion at a HSCM
strategic level regards Forres Health
and Care Centres potential
contribution towards Minor Injury
assessment and treatment.
FHCC promoted as part of
the ‘NHS24 111’ model for
Minor Injury provision. 
Improve locality access to
Minor Injury provision.
Jun – 
2023
70%
Consider an altered model of Minor
Injury provision utilising Forres Health
and Care Centre for specific
treatments.
Partial return of Minor Injury
treatment to FHCC.
Jun – 
2023
70%
Review Minor Injury work being
undertaken within Moray Coast
Medical Practice.
Review completed.    Sept – 
2023
80%
Page 62

Page 63

6 
APPENDIX 1 
Local Priority 6
Establish models of engaging with the community and ensuring the communities voice is visible within locally planning and
strategic planning processes
Action Measure of Success Desired Outcome Timeline Progress
%
Update contact information for Forres
and Lossiemouth Locality Services
and promote involvement.
Contact information
updated.
Increase community
representation within locality
and Moray wide HSCM
planning processes.
April – 
2023
100%
Arrange a contact point at FHCC and
MCMP where information can be
shared and the views of the
community gathered on an ongoing
basis.
Patient/local resident
feedback recorded
periodically and themes
shared with the Locality
Oversight Group.
April – 
2023
100%
Review public Information messaging
within the locality.
Public Information
messaging updated.
Jun – 
2023
100%
Facilitate regular ‘Pop Up’ community
events to gather feedback, and share
service information on an ongoing
basis.
Patient/ local resident
feedback recorded
periodically. 
Oct – 
2023 
50%
Review the role of the Third Sector
and Community Groups in the Forres
and Lossiemouth Locality Planning
model.
Increased involvement of
Third Sector and
Community Groups.
Jun – 
2023
100%
Plan a community engagement event
for Forres and Lossiemouth which
promotes positive messaging, gathers
views of public and other
stakeholders, and contributes towards
locality planning and HSCM Strategic
Plan.
Event completed,
evaluated and information
shared with the oversight
group.
Information utilised to form
next reiteration of the
Forres and Lossiemouth
Locality Plan. 
Sept – 
2023
10% 
Page 63

Page 64

7 
APPENDIX 1 
Local Priority 7
Improve timescales for the completion of social care assessments and reviews.
Action Measure of Success Desired Outcome Timeline Progress
%
Explore Forres and Lossiemouth
locality options to support social work
staff in completion of assessments.
Focused discussion
completed and actions
identified.
Improve time for completion of
social care assessments and
reviews.
Jun – 
2023
100%
Monitor ‘test of change’ in relation to
referrals coming straight to the ‘long
term team’ from ‘access team.
Information collated and
shared.
Jun – 
2023
100%
Page 64

Page 65

8 
APPENDIX 1 
Local Priority 8
Improve transport provision between Lossiemouth and coastal villages.
Action Measure of Success Desired Outcome Timeline Progress
%
Increase publicity relating to the Dial a
Bus service within the Lossiemouth
and coastal areas. 
Increased public
awareness of the service.
Improve the transport provision
between Lossiemouth and the
coastal villages.
April – 
2023
100%
Gather data to evidence or otherwise
the need for an enhanced transport
provision.
Use of Dial a Bus and the
local Community Mini Bus
recorded and shared.
April – 
2023
90%
Facilitate further discussions with key
transport providers and local
community.
Meetings undertaken with
key transport providers and
actions noted.
April – 
2023
90%
Support local community based trans-
port initiatives.
Regular meetings, and
sharing of information and
resources with the local
Community Mini Bus
Committee.
March –
2024
90%
Promote active travel  Promotion of active travel
undertaken through social
media and webpages.
March –
2024
0% 
Page 65

Page 66

9 
APPENDIX 1 
Local Priority 9
Support access to appropriate health and social care services.
Action Measure of Success Desired Outcome Timeline Progress
%
Review public information regarding
contacting local GP, and health and
social care professionals.
Review of current
information undertaken and
shared with the Locality
Oversight Group.
Increase in public
satisfaction in accessing
health and social care
appointments. 
Improve access to health
and social care services via
the use of digital
technology. 
Measure and evaluate the
quality of service provision.
Im
April - 2023 90%
Promote and inform the public in
regards to the current models of
practice.
Public promotion campaign
completed.
April – 
2023
50%
Establish a small group to focus
specifically on access to digital
technology within local communities.
Group stablished and plan
in place.
April – 
2023
100%
Support individuals within localities to
access health care support through
digital technology.
Individuals identified and
support provided.
Sept – 
2023
60%
Provide specific digital technology
training to local residents who require
support.
Training provided and
evaluated.
Sept – 
2023
80%
Research, and equip specific sites
within the locality to house digital
technology to access health and
social care professionals.
Sites identified, funding
sought and work
undertaken. Usage
evaluated and shared with
the Locality Oversight
Group. 
March – 
2024
80%
Develop measurements and systems
to monitor the effectiveness of health
and social care provision at a locality
level
Evidence base to measure
performance and evaluate
outcomes.
March 2025 20%
Page 66

Page 67

10 
APPENDIX 1 
Further develop an enhanced
community nursing and care service
to provide support to vulnerable
people living at home and who are
finding it difficult to travel to
appointments
Patients within the
vulnerable groupings are
triaged and receive support
at home or the immediate
community. 
March 2024 50% 
Local Priority 10
To increase support for unpaid carers and recruitment of paid carers
Action Measure of Success Desired Outcome Timeline Progress
%
To identify support for unpaid carers
within the locality and how they can
access this.
Information collated and
shared. 
Increased support for unpaid
carers.
Sept – 
2023 
50%
To work alongside the Digital Health
Institute and Quarriers to develop a
digital Person Held File prototype.
Digital Person Held File
prototype is developed and
tested.
Unpaid carers have access
to all appropriate information
regards the person they are
caring for.
April – 
2024
70%
To support recruitment of care at
home workers within the locality
Increased care at home
staffing numbers.
Increased care at home
availability. 
April – 
2024
50% 
Page 67

Page 68

1 
APPENDIX 2 
ELGIN LOCALITY ACTION PLAN – UPDATE NOV 2023 
Local Priority 1
Establishing Elgin Oversight Group with Terms of Reference
Action Measure of
Success
Desired Outcome Timeline Progress
%
Communicate out draft locality plan to
identified members of Oversight Group
Oversight group
established and
locality plan shared. 
To become established within the Elgin
Locality to drive forward the key priorities
identified. 
Feb 23
100% 
Organise and confirm date of first
Oversight Group meeting
Meeting scheduled. 
Feb 23
100% 
27/4/23 
Local Priority 2
Establish models of engaging with the community and ensuring the communities voice is visible within locally planning and
strategic planning processes – To be further explored and discussed at the Oversight Group 
Item 8.
Page 68

Page 69

2 
APPENDIX 2 
Local Priority 3 
Mental health and wellbeing.- To be further explored and discussed at the Oversight Group 
Local Priority 4
Improve Multi Disciplinary Team working
Action Measure of
Success
Desired Outcome Timeline Progress
%
Document current models of provision
within Elgin
Review undertaken
and shared. 
Improvement in MDT working within Elgin
area.
April 23 100%
Evaluate 'How Good Is Our MDT
Working' within Elgin
Survey staff on
effectiveness of
current MDT working
completed.
June 23 50%
Discuss and agree any improvements
to current models
Information reviewed
and actioned.
June 23 20% 
Local Priority 5
Support access to appropriate health and social care services.
Action Measure of Success Desired Outcome Timeline Progress
%
Review public information regarding
contacting local GP, and health and
social care professionals
Review of current
information
undertaken and
shared with the
Locality Oversight
Group.
Increase in public satisfaction in accessing
health and social care
appointments/services. 
Improve access to health and social
care services via the use of digital
technology. 
March 24 50%
Promote and inform public in regards
to the current models of practice
Public promotion
campaign
completed.
March 24 50%
Page 69

Page 70

3 
APPENDIX 2 
Support individuals within localities to
access health care support through
digital technology
Individuals identified
and support provided. 
March
2024
50%
Page 70

Page 71

4 
APPENDIX 2 
Page 71

Page 72

APPENDIX 3
1
Keith and Speyside Locality 
ACTION PLAN – UPDATE NOV 2023 
Local Priority 1 
Working with and understanding the needs and expectations of local communities 
Action Measure of Success Desired Outcome Timeline Progress
%
Events - ‘Let’s talk health, wellbeing and
communities’ events. 
Keith 
Keith Grammer School 
Speyside 
Turnout of services,
groups and public and
event feedback.
Networking and familiarization
of services and groups working
in area. Awareness raising and
education of communities and
services .Prevention through
raising awareness. 
Holistic overview of
communities needs and
expectations to support Locality
Planning and collaborative
working 
Prevent duplication of effort and
work across the locality and
build on joint working
opportunities and alignment of
plans. 
Aug 2022 
July 2023 
Sept 2024 
100% 
100% 
10%
Surveys and Data – working
collaboratively with the Communality
Development Unit (CDU) and Health
Improvement Team and others as
appropriate to gain a holistic overview of
the area, needs and expectations of the
community. 
Surveys completed and
feedback collated 
Utilise data available to
HSCM, alongside any
additional data available
via CDU, Health
Improvement Team and
others to build a holistic
overview of the locality.   
Item 8.
Page 72

Page 73

APPENDIX 3
2
Keith 
Speyside  
Being able to utlise existing
networks, services and groups
to share and obtain information
via to support awareness and
prevention. 
July – Sept
2022 
Aug – Oct
2024 
100% 
10%
Networks and Communication -
Working and talking with other services,
third sector and community groups and
utilising their community networks,
patients and client groups for the sharing
and gathering of information. 
Collaborative working
opportunities and ability
to share and obtain
information from a
variety of client groups
across the locality
Jan 2022 -
ongoing
80%
Local Priority  2 
Prevention, Awareness, Self-Support and improved access to services and support 
Action Measure of Success Desired Outcome Timeline Progress
%
Development of Oversight Group Appropriate
representation from
across sectors and the
community to support
Locality Planning and
Working
An established Oversight Group
with core members and
members with specific areas of
interest and/or expertise, to
plan, support and develop
locality planning and work and
drive forward key priorities
identified.
April 23 -
ongoing
100%
Locality Services Hub – Utilise the
Fleming Hospital site to create a
services hub. Housing a variety of
Multiple disciplines
delivering services from
the hub and preventing
Services delivered nearer to
home for Speyside and the
wider locality, supporting
March
2022 -
ongoing
75%
Page 73

Page 74

APPENDIX 3
3
teams and services communities having to
travel to Elgin. Specialist
third sector services
attracted into the locality 
prevention and living well. 
Improved MDT working and
opportunities.
KELP (Keith and East Locality Project)
– Determining what is required building
wise to deliver GP and other services in
the locality
Application to Scottish
Government to fund
A custom built building to
accommodate a GP practice
and other services as
determined as needed through
various workshops, input and
feedback from across services
and the community.
Ongoing 
Local Priority 3  
Further development and growth of multi-disciplinary team working (MDT) to ensure that the right people are around the right   
matter at the right time
Action Measure of Success Desired Outcome Timeline Progress
%
Professionals Directory – an online
directory with all health and social care
professionals working in and across
Keith and Speyside Locality. The
directory also provides a communication
channel for the distribution of news and
updates. 
People accessing the
directory and utilising.
Multi-Disciplinary working
opportunities, ensuring the
right people are around the
appropriate matters at the right
time. 
Easier and more efficient
access for professionals to
contact other professionals,
with direct contact details and
referral processes. 
Sept 2022 100%
Page 74

Page 75

APPENDIX 3
4
A communication channel to all
professionals working in and
across the locality. 
Services Hub – as detailed in priority 2     
Oversight Group – Development of  An Oversight Group with
key partners from
across the locality
developed to support
Locality Plans and
working.
A main Oversight Group
membership with other
disciplines attending to support
specific pieces of work and/or
communities.
Action plans in place for
locality.
Ongoing  100%
Multi-Disciplinary Working and
Opportunities - Document, evaluation
and improvement of  current models of
multi-disciplinary team (MDT) working
and meetings across Keith and
Speyside 
An overview collated of
all current MDT working
and meetings operating
across Keith and
Speyside including
Community Hospitals 
Evaluation of what
works well and what
could work better,
through discussion 
Identification of any
potential gaps or
duplications to MDT
working, meetings and
opportunities
Efficient and effective MDT
working across Keith and
Speyside. 
MDT meetings relevant and
timely. 
Prevent duplication of work
and improve relationships and
understanding across teams. 
New opportunities to work
collaboratively with other
services, third sector and
community groups. 
March
2023 -
ongoing
100%
Page 75

Page 76

APPENDIX 3
5
Discussions and
agreement of any
improvements, changes
and additional MDT
working or meetings that
might be required. 
Joined up working across
locality boundaries to support
efficiencies, effectiveness and
improve outcomes as
appropriate. 
Page 76

Page 77

1 
APPENDIX 4 
Buckie, Cullen and Fochabers 
Locality Plan 2023 – 2026 
Action Plan Update November 2023
Item 8.
Page 77

Page 78

2 
APPENDIX 4 
BUCKIE, CULLEN AND FOCHABERS LOCALITY ACTION PLAN – UPDATE NOV 2023 
Local Priority 1 
Establishing Buckie Locality Oversight Network with Terms of Reference
Action Measure of Success Desired Outcome Timeline Progress
%
Identify and Engage with key stakeholders
to establish the Oversight Network 
Oversight network
established.
To have a shared responsibility
to respond to identified priorities
to improve outcomes for the
Buckie, Cullen and Fochabers
Communities. 
March
2024
60%
Schedule a series of individual stakeholder
engagement sessions
Stakeholder engagement. March
2024
30%
Disseminate the draft Buckie Locality Plan
to the Oversight Group
Locality Plan Shared. March
2024
50% 
Local Priority 2
Establish models of engaging with the community and ensuring the communities’ voice is visible within locally planning
and strategic planning processes; building on and extending the reach of community engagement undertaken as part of
the Local Outcome Improvement Plan (LOIP).
Action Measure of Success Desired Outcome Timeline Progress
%
Plan a community engagement event for
the Buckie Locality which promotes
positive messaging, gathers views of
public and other stakeholders, and
contributes towards locality planning and
HSCM Strategic Plan
Event takes place and
priorities identified. 
To identify community priorities.  March
2024
40%   
Page 78

Page 79

3 
APPENDIX 4 
Local Priority 3 
To improve Health and Wellbeing (Mental and Physical Health) of all ages 
Action Measure of Success Desired Outcome Timeline Progress
%
Identify gaps within current range of
services available within communities
Gaps noted and actions
identified to address these
where possible.
Increase the range of provision
available within the locality.
Sept – 
2023
70%
Social Prescribing - Develop a model
of provision encompassing a range of
services available within communities
Model established in
locality area.
Increase in the number of
individuals who are redirected
towards a non-clinical based
service/intervention. 
Sept – 
2023
70%
Review preventative approaches to
address the 5 most prevalent Long
Term Conditions: Asthma, Arthritis,
Coronary Heart Disease, Cancer and
Diabetes
Review of preventative
approaches undertaken
and information shared with
the local practitioners.
Reduction in the requirement for
hospital based admissions.
March – 
2024
70%
Maximise opportunities for all via
preventive approaches/conversations
through the use of Making Every
Opportunity Count tools/training 
Adoption of the MEOC tool
by all services involved with
Social Prescribing model.
Increase citizen’s awareness of
financial supports.
Jun – 
2023
100% 
Page 79

Page 80

4 
APPENDIX 4 
Local Priority 4 
To improve Multi-Disciplinary Team (MDT) working.
Action Measure of Success Desired Outcome Timeline Progress
%
Identify and review the MDT model
within the Buckie Locality
Review undertaken. Improvement in Multi
Disciplinary Team working
within Buckie Locality.
Jun – 
2023
70%
Evaluate 'How Good Is Our MDT
Working' within Buckie Locality
Survey staff on effectiveness
of current MDT working
completed.
March –
2024
50%
Implement improvements identified   March – 
2024
30% 
Local Priority 5
Support access to appropriate Health and Social Care services.
Action Measure of Success Desired Outcome Timeline Progress
%
Review public information regarding
contacting local GP, and Health and
Social Care professionals.
Review of current
information undertaken and
shared Nationally, Moray
wide and with the Locality
Network Group.
Increase in public
awareness / satisfaction. 
March 2024 100%
Support individuals within localities to
access health care support through
digital technology.
Individuals identified and
support provided.
Improve access to health and
social care services via the
use of digital technology.
March 2024 60% 
Page 80

Page 81

APPENDIX 4 
Page 81

Page 82

REPORT TO: MORAY INTEGRATION JOINT BOARD ON 25 JANUARY 2024 
SUBJECT: LOSSIEMOUTH LOCALITY HEALTH AND SOCIAL CARE
PROVISION UPDATE 
BY:  DEPUTY HEAD OF SERVICE (INTERIM) 
1. REASON FOR REPORT 
1.1 To inform the Board on the progress made in relation to the development of
health and social care provision within the Lossiemouth Locality, in partnership
with the local community and practitioners. 
2. RECOMMENDATION 
2.1 It is recommended that the Moray Integration Joint Board (MIJB): 
i) notes the current position in relation to Hopeman and Burghead
branch surgery buildings; 
ii) notes the request from the Cabinet Secretary for NHS Recovery,
Health and Social Care that an officer from another Health and Social
Care Partnership (HSCP) meet with representatives from Health and
Social Care Moray (HSCM) to discuss the engagement and
consultation process undertaken regarding the Burghead and
Hopeman branch surgery premises; and 
iii) agrees the role of Glasgow School of Art in supporting General
Practice visioning work within Moray. 
3. BACKGROUND 
3.1 On 14 July 2023, the Moray Coast Medical Practice formally notified the
landlord of the Burghead branch surgery building that they were terminating the
lease for the premises on 31 December 2023. The lease has now been
terminated. 
3.2 On 29 August 2023, the Moray Coast Medical Practice notified the Chief Officer
of HSCM that they did not intend to reopen the Hopeman premises. The Moray
Coast Medical Practice subsequently sold the premises to a private buyer in
October 2023.
Item 9.
Page 82

Page 83

3.3 Mitigating actions following the closure of the branch surgery buildings remain
in place and are now integrated into, and monitored through, the Forres and
Lossiemouth Locality Planning Structure. The Lossiemouth Locality Planning
Group (LLPG), which has community and practitioner representation, will have
the role of amending and adapting said actions based on local intelligence, data
and ongoing engagement. The governance of this will be through the Forres
and Lossiemouth Locality Plan and will be reported to the MIJB on a 6 monthly
basis as part of the Locality Planning reporting structure. 
3.4 The LLPG intends to begin broader community engagement work in early 2024
which will help guide the LLPG and wider HSCP in future service design and
delivery at a local and Moray wide level. This engagement work will be on a
themed basis on topics such as transport, accessing health and social care
services, and digital technology. 
3.5 A further offer has been extended to representatives of the Save our Surgeries
group to participate in the LLPG. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The Cabinet Secretary for NHS Recovery, Health and Social Care is seeking
assurance on the engagement and consultation process following being
contacted by the Save our Surgeries group. They have designated an officer
from another HSCP to undertake this role; the Head of Primary Care, Argyll and
Bute will meet with the Save our Surgeries group and then with representatives
of HSCM. The officer’s remit is ‘to seek assurance for the Scottish Government
that consultation and engagement with communities during a process of service
change has been carried out appropriately; with a view to making
recommendations to the Scottish Government if he identifies any wider lessons
from his visit and to Moray HSCP if there are improvements in their
engagement they could make’. 
4.2 A meeting was scheduled to take place between the nominated officer and the
Save our Surgeries group on 15 January 2024. 
4.3 A formal meeting between the nominated officer and representatives of HSCM
was also scheduled for later on 15 January 2024. Prior to the meeting the
officer was provided with a range of information relating to the community
engagement and consultation process including links to all MIJB reports and
supporting documentation. Learning gained through these discussions will be
fed back to the MIJB on 28 March 2024, and will be incorporated into future
engagement activity. 
4.4 Discussions have taken place with The Glasgow School of Art (GSA) regarding
what support they could provide towards helping facilitate the design of the
future model of GP Practice Provision in Moray. Initial planning has identified a
3 Stage approach. 
4.5 GSA will work with community and practitioner representatives to design a
vision for a future model of GP Practice provision in Moray. This would involve
working with a small group to create a draft vision, creatively share that more
broadly, and refine. Key components would be; skill and resource
requirements; supporting services and communities to transition; and policy
Page 83

Page 84

development.  GSA would bring their skills, resources, and ingenuity to this
process, which would be invaluable. 
4.6 An offer will be made to representatives of the Save Our Surgery group, and
the wider community, to participate in the General Practice visioning work
described above, as well as reiterating the offer to be involved in the broader
NHS Grampian Primary Care visioning work that is currently taking place.   
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Moray Partners in Care 2022-2032”
The policy and approach set out in this report is consistent with the
ambitions of the MIJB Strategic Plan in providing care at home or close
to home with a particular emphasis on the needs of older people. This
locality approach is also consistent with the ambitions of the Moray
Council Corporate Plan and the Moray Community Planning Partnership
LOIP. 
(b) Policy and Legal
None directly associated with this report. 
(c) Financial implications
Funding will be required to be sourced for the General Practice Visioning
work. Discussion is ongoing with GSA in relation to this. 
(d) Risk Implications and Mitigation
There are no specific risk implications to this report. 
(e) Staffing Implications
There are no specific staffing implications to this report. 
(f) Property
There are no property implications to this report. 
(g) Equalities/Socio Economic Impact
There are no changes to policy as a result of this report. 
(h) Climate Change and Biodiversity Impacts
There are no changes to policy as a result of this report. 
(i) Directions
None directly arising from this report. 
(j) Consultations
Simon Bokor-Ingram, Chief Officer, HSCM
Sean Coady, Head of Service, HSCM
Robert Lockhart, Primary Care Clinical Lead, HSCM
Malcolm Simmons, Primary Care Clinical Lead, HSCM
Alison Frankland, Practice Manager, Moray Coast Medical Practice
Fiona McPherson, Communication and Engagement Officer
Bob Sivewright, Finance Manager, NHS Grampian
Deborah O’Shea, Interim Chief Financial Officer, HSCM
Page 84

Page 85

6. CONCLUSION 
6.1 That the MIJB note the content of the report and agree that GSA should
be commissioned to support this work. 
Author of Report: Iain Macdonald, Locality Manager (Deputy Head of Service,
Interim) 
Background Papers:  None
Ref: 
Page 85

Page 86

REPORT TO: MORAY INTEGRATION JOINT BOARD ON 25 JANUARY 2024 
SUBJECT: CAREFIRST REPLACEMENT 
BY:  CHIEF SOCIAL WORK OFFICER 
1. REASON FOR REPORT 
1.1 To inform the Board of the requirement for a replacement Social Work services
client based recording system. 
2. RECOMMENDATION 
2.1 It is recommended that the Moray Integration Joint Board (MIJB): 
i) note the requirement for a replacement Social Work services client
based recording system; and 
ii) agree the initiation of a process to begin scoping a replacement
system. 
3. BACKGROUND 
3.1 A report submitted to Audit, Performance and Risk Committee on 24 November
2022 providing an update on Internal Audit Completed Projects which included
reference to a review of the Carefirst System undertaken and asked the
Committee to note the recommendation to replace Carefirst (para 7 of minute
refers).   
3.2 Carefirst 5 was implemented in 1998 and upgraded to Carefirst 6 in 2010.  The
last update took place in 2017.   
3.3 There are around 450 users of Carefirst with the majority being frontline social
workers and social care workers, the system supports the following functions; 
• Adult & Childrens Social Work and Social Care Services
• Justice Services
• Finance
• Local Authority Occupational Therapy 
3.4 The system currently supports around 10,000 live cases.   
Item 10.
Page 86

Page 87

3.5 The current contract is due to expire on 31 March 2024 and a year long
extension to this will be sought, to allow the full procurement process for a
replacement system.   
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The current Carefirst System is now a legacy system and cannot be upgraded
as the supplier has developed a new platform and product.  It is possible that
the current provider will stop offering support and no further developments of
the system may be possible.  It is outdated and does not align with other
programmes in order to create required performance reporting.   
4.2 The system is not cloud based which means users must be logged into the
Council Network.   This means that currently only users with a Moray Council
log in and device can have access to Carefirst.   
4.3 Carefirst does not allow documents to be uploaded meaning that documents
are stored in various places including paper and electronic files.  Collating
information regarding cases can be very time consuming.  A single system for
all information would provide a more secure means of holding sensitive
information and would allow for staff to access templates and completed
documents in one secure place. 
4.4 Reports for Statutory Returns, Freedom of Information and team performance
are produced from a different system due to the restrictions of the Carefirst
system.  It currently is not possible to pull performance reports from the system. 
Replacing the system would allow for a more streamlined approach, saving
Officer time. 
4.5 As part of the scoping, consideration would be given as to how enhanced
financial monitoring of social care spend can be incorporated into any new
system. 
4.6 There has been significant growth in Social Work and Social Care activity and
related need to record information about individuals coming into contact with
services.   The system is time consuming for staff working with an outdated
system. A more technologically advanced system would free up social work
and social care time to allow more time to be spent with individuals and families
coming into contact with services.  It would also allow for smarter reporting,
better governance and oversight with reports being able to be produced in real
time.   
4.7 Interfaces between Carefirst and other systems can be considered but would
be costly and will require a lot of time to build, there is also a possibility that
software will not support the process.  There will also be a risk of increased
human errors to information that requires to be accurate. 
4.8 Initiating the process now would allow for the new system to be procured and
work beginning for the transfer to a new system. It would take the minimum of a
year to finalise the process. 
Page 87

Page 88

4.9 A project manager would require to be appointed to lead this process with a
dedicated multi-agency team and resources.   
4.10 There are a variety of systems used across Scotland and Grampian. An
opportunity to do some scoping would help inform the position for Moray and
learn from other local authorities who have recently replaced their case
management systems. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
This scoping work would ensure that our systems are as simple
and efficient as possible, and, is in line with the strategic context
of the aforementioned documents. 
(b) Policy and Legal
There are no legal implications arising from this report. 
(c) Financial implications
There will be a cost to recruiting a team and replacing the system which
will be brought back to committee when there scoping work has been
initiated.   
(d) Risk Implications and Mitigation
There are risks to remaining with the current system in that it is not
subject to any new updates or developments, with the developer having
created a new system. To continue with Carefirst would risk problems
developing that cannot be resolved. Every single case open to social
work is recorded on Carefirst and staff rely on this to be able to pull
together information pertaining to individuals open to services. It is also
where managers have oversight of the work being undertaken by staff. 
Carefirst is not adequately supported by OLM, the system provider. The
support currently in place from OLM is significantly limited and will
eventually cease, as OLM have rolled out a new product. Further to this,
Carefirst will not be updated. This means that any changes to legislation
and regulation with associated reporting, will need manual data retrieval
and report writing as OLM cannot create new reporting scripts. 
We are mitigating these risks by starting a procurement process.   
(e) Staffing Implications
Project manager and team to progress the procurement of a new system. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
There are no equalities implications arising from this report. 
Page 88

Page 89

(h) Climate Change and Biodiversity Impacts
There are no climate change implications arising from this report. 
(i) Directions
There are no directions arising from this report. 
(j) Consultations
Chief Officer; Interim Chief Financial Officer; IT; Service Managers; 
Information Systems Officer; Senior Auditor Corporate Services. 
6. CONCLUSION 
6.1 This report provides an update regarding the Carefirst Social Work
services client based recording system and the intention to begin the
procurement process for a replacement. 
Author of Report:  Tracy Stephen
Background Papers:
Ref:   
Page 89

Page 90

REPORT TO: MORAY INTEGRATION JOINT BOARD ON 25 JANUARY 2024 
SUBJECT: REAPPOINTMENT OF CHIEF INTERNAL AUDITOR 
BY:  CHIEF OFFICER 
1. REASON FOR REPORT 
1.1 To ask the Moray Integration Joint Board (MIJB) to consider the reappointment
of the Chief Internal Auditor, whose current terms of appointment are due to
expire on 31 March 2024. 
2. RECOMMENDATION 
2.1 It is recommended that the MIJB formally agrees to appoint Dafydd Lewis,
Audit and Risk Manager, Moray Council, as the Chief Internal Auditor of
the MIJB, for a further period of two years to 31 March 2026. 
3. BACKGROUND 
3.1 Section 12 of the Moray Health and Social Care Integration Scheme sets out
the arrangements for establishing an adequate and proportionate internal audit
service for review of the arrangements for risk management, governance and
control of the delegated resources. 
3.2 At the meeting on 31 March 2016 (para 7 of the minute refers), the MIJB
agreed the key responsibilities of the Chief Internal Auditor role and to formally
appoint the Moray Council’s Internal Audit Manager as the MIJB Chief Internal
Auditor for an initial period of 2 years. 
3.3 The appointment has recognised that existing internal audit arrangements
within the Council and NHS Grampian will be maintained. There is a
requirement that the delivery of an internal audit service to the MIJB is in
accordance with the Public Sector Internal Auditing Standards to ensure
appropriate arrangements are in place for audit planning, reporting and
providing an annual opinion on the overall adequacy and effectiveness of the
MIJB risk management, control and governance processes. This opinion is
based on the work the internal audit services of the Council and NHS Grampian
has performed. However, this requires sufficient available auditing resources
within both Organisations. 
Item 11.
Page 90

Page 91

3.4 At the MIJB meeting on 27 January 2022, the MIJB agreed to formally appoint
Dafydd Lewis, Audit and Risk Manager, Moray Council, as the Chief Internal
Auditor for the MIJB, for a period of two years to 31 March 2024 (para 9 of the
minute refers). 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The Chief Internal Auditor role is a statutory requirement and a further
appointment is now required. 
4.2 It is the responsibility of the MIJB to establish and maintain adequate and
proportionate internal audit arrangements. These are considered to be best
served by utilising Council internal audit staff to provide assurances on funding
provided to the MIJB by the Council and seeking similar assurances from the
internal auditors of NHS Grampian in regard to contributions to the MIJB by
NHS Grampian.  It is proposed that the current arrangements continue for a
further 2 years to 31 March 2026 to further develop the Internal Audit provision
to the MIJB. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
Good governance arrangements will support the MIJB to fulfil stated
objectives. The provision of an independent internal audit service is one
aspect of good governance. 
(b) Policy and Legal
The arrangements to appoint an Internal Audit Service for the MIJB are
set out in section 12 of the Integration Scheme and have been referred
to within this report. 
The MIJB is subject to the accounts and audit provisions contained
within Part VII of the Local Government (Scotland) Act 1973 and
regulations made under this Act, as it is a body listed under section 106
of the Act. In particular, the Board, by virtue of regulation 7 of The Local
Authority Accounts (Scotland) Regulations 2014, must operate a
professional and objective internal auditing service in accordance with
recognised standards and practices in relation to internal auditing. 
(c) Financial implications
The Financial Regulations of the MIJB state that the MIJB shall secure
the provision of a continuous internal audit service to provide an
independent and objective opinion on the control environment
comprising risk management, governance and control of delegated
resources. Moray Council’s Audit and Risk Manager will undertake this
additional responsibility to fulfil the responsibilities of the Chief Internal
Auditor for the MIJB. These services are currently provided at no cost to
the MIJB. 
Page 91

Page 92

(d) Risk Implications and Mitigation
If an appointment is not made there will a breach of regulations and likely
adverse comment from the MIJB’s external auditor. 
(e) Staffing Implications
The MIJB Chief Internal Auditor is employed by Moray Council.  If
reappointed, they will continue to be employed by Moray Council.  Duties
for the MIJB will continue to fall within their remit.  This arrangement will
be subject to ongoing review through the APR Committee to ensure
delivery of audit services for the MIJB remains sustainable. 
(f) Property
None arising directly from this report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
consider a re-appointment. 
(h) Climate Change and Biodiversity Impacts
None arising directly from this report. 
(i) Directions
None arising directly from this report. 
(j) Consultations
Consultations on this report have been undertaken with the following
staff who are in agreement with the content of this report where it relates
to their area of responsibility:   
• Chief Officer, MIJB
• Legal Services Manager, Moray Council
• Interim Chief Financial Officer, MIJB
• Corporate Manager, HSCM
• Audit and Risk Manager, Moray Council
• Caroline O’Connor, Committee Services Officer, Moray Council
• Senior HR Advisor, Moray Council 
6. CONCLUSION 
6.1 The period of appointment for the Chief Internal Auditor is due to expire
and a further appointment is necessary to meet statutory requirements. 
Author of Report: Isla Whyte, Interim Support Manager, HSCM
Background Papers:  with author
Ref: 
Page 92

Page 93

REPORT TO: MORAY INTEGRATION JOINT BOARD ON 25 JANUARY 2024 
SUBJECT: REAPPOINTMENT OF STANDARDS OFFICER AND DEPUTE
STANDARDS OFFICER 
BY:  CHIEF OFFICER 
1. REASON FOR REPORT 
1.1 To ask the Board to consider the reappointment of its Standards Officer and
one Depute, whose current terms of appointment are due to expire on 1 April
2024. 
2. RECOMMENDATION 
2.1 It is recommended that the Moray Integration Joint Board (MIJB): 
i) formally nominates for approval by the Standards Commission,
Alasdair McEachan, Head of Governance, Strategy and Performance,
Moray Council, as the Standards Officer of the MIJB, for a further
period of two years until 1 April 2026; 
ii) formally nominates for approval by the Standards Commission,
Aileen Scott, Legal Services Manager, Moray Council, for a further
period of two years until 1 April 2026; 
iii) tasks the Chief Officer with writing to the Standards Commission
with the relevant information; and 
iv) notes that the arrangements will be reviewed prior to April 2026. 
3. BACKGROUND 
3.1 At its meeting on 31 March 2022, the Board agreed to nominate its current
Standards Officer and Depute for the approval by the Standards Commission
(para 10 of minute refers).  Subsequent to this meeting, approval from the
Standards Commission was obtained for the appointments. 
3.2 Prior to January 2019 there was a legal representative at MIJB meetings and
concerns had been raised that there would be a conflict of interest to continue
to have the Standards Officer as a Member of the Board.  Since January 2019
Item 12.
Page 93

Page 94

there has not been any legal representation at MIJB meetings due to a
reduction in the size of the Moray Council legal team.  For assurance,
discussions are held with legal advisors where necessary and all reports are
reviewed by the Standards Officer (or Depute) prior to circulation to members.
The Standards Officers are “on standby” during meetings and should there be a
need for legal clarification they would be available. No complaints over the
conduct of Board members (in terms of the Code) have been received. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The two year appointment period for the Standards Officer and Depute is due
to expire 1 April 2024.  The Standards Officer post is a statutory requirement
and further nominations are required. 
4.2 Following discussion with the Standards Officer it is recommended that the
existing arrangements continue and that the nominations identified in Section 2
be approved.  There is recognition that further Induction training is required for
MIJB members, and this will be scheduled for early 2024. 
4.3 The Standards Commission has to approve the MIJB nominations. Following
the Board’s decision on this matter, the Chief Officer will write to the Standards
Commission with the appropriate information, setting out the MIJB’s agreement
of the nominations. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
Good governance arrangements will support the Board to fulfil its
objectives.  An appointment of a Standards Officer is one aspect of good
governance. 
(b) Policy and Legal
The Ethical Standards in Public Life etc. (Scotland) Act 2000 (Register of
Interests) Regulations 2003 (Scottish Statutory Instrument 2003/135)
requires the Board to appoint a Standards Officer. The Standards
Commission has to approve the appointment of the Standards Officer.
Any individual appointed requires to be suitably qualified and
experienced.  The role of the Standards Officer is to promote awareness
of the Code of Conduct for IJB members and to act as a point of contact
for both Standards Commissioners. 
(c) Financial implications
None arising directly from this report. 
(d) Risk Implications and Mitigation
Elements of the work of the Standards Officer are requirements of the
2003 Regulations. The Board is required to comply with these
Regulations and make an appointment.  An appointment of a Standards
Officer will help assist members with compliance with the Code of
Conduct. 
Page 94

Page 95

(e) Staffing Implications
The nominated Standards Officer and Depute are employed by the
Moray Council. Once reappointed, they will continue to be employed by
the Council. Duties for the Board will continue to be added to what are
already full remits. This arrangement will need to be reviewed to
determine whether it will be a reasonable long term proposition. 
(f) Property
None arising from this report. 
(g) Equalities/Socio Economic Impact
An Equalities Impact Assessment is not required because there are no
service, policy or organisational changes being proposed. 
(h) Climate Change and Biodiversity Impacts
None arising directly from this report.   
(i) Directions
None arising directly from this report.   
(j) Consultations
Consultation on this report has taken place with the Chief Officer; Interim
Chief Financial Officer; Head of Governance, Strategy and Performance;
Legal Services Manager and Caroline O’Connor, Committee Services
Officer, all Moray Council; who are in agreement with the contents of this
report as regards their respective responsibilities. 
6. CONCLUSION 
6.1 The previous appointments of Standards Officer and Depute are due to
expire and further appointments are necessary to meet statutory
requirements.  This report sets out the proposal for the next two years. 
Author of Report: Isla Whyte, Interim Support Manager, HSCM
Background Papers:  with author
Ref: 
Page 95

Page 96

REPORT TO: MORAY INTEGRATION JOINT BOARD ON 25 JANUARY 2024 
SUBJECT: CARE FOR PEOPLE PLAN – MORAY ARRANGEMENTS  
BY: CORPORATE MANAGER   
1. REASON FOR REPORT 
1.1 To provide assurance to the Board that Health and Social Care Moray (HSCM)
have developed an operational framework to deliver the Care for People
Strategy. 
2.  RECOMMENDATION 
2.1  It is recommended that the Moray Integration Joint Board (MIJB): 
i) note that a Care for People Operational Framework has been
developed in conjunction with its partners, as set out in the
operational document (Appendix A); and 
ii) note that continued improvement and implementation of the Care
for People is now business as usual.  
3. BACKGROUND 
3.1 The inclusion of Integration Joint Boards (IJBs) as Category 1 Responders in
terms of the Civil Contingencies Act 2004 (the 2004 Act); the requirements and
the arrangements in place and plans to ensure that the IJB meets its
requirements under the Act. 
3.2 Responsibility of the Chief Officer, as its Accountable Officer, to carry out all
necessary arrangements to discharge the duties on behalf of the IJB under the
2004 Act. 
Item 13.
Page 96

Page 97

3.3 This legislation requires MIJB to meet specific statutory requirements. The Civil
Contingencies Act 2004 (CCA), is supplemented by the Contingency Planning
(Scotland) Regulations 2005 and “Preparing for Scotland” Guidance. Taken
together the law and guidance provides a consistent and resilient approach to
emergency planning, response and recovery, which has been used to develop
good practice. 
3.4 The Act placed these duties on IJBs as Category 1 Responders. It defines an
emergency as: 
• An event or situation which threatens serious damage to human welfare;
• An event or situation which threatens serious damage to the environment;
• War, or terrorism, which threatens serious damage to the security of the
UK.  
4.  KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 To provide MIJB with oversight of the operational document (APPENDIX A)
that has been developed to support HSCM to activate, set-up, operate, manage
and de-activate the Care for People (CfP) teams should they be deemed
necessary in response to a significant or disruptive incident affecting the
population of Moray area. 
4.2 This framework was tested in the recent Storm Babet response to some degree
and its effectiveness will be reviewed during the upcoming debrief. 
4.3 Learning from the exercises on 13 November 2023 and 5 December 2023 will
be incorporated into the ongoing development of the framework. 
5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Partners in
Care 2022-2032” 
The aims of this document link with the themes of the MIJB Strategic Plan;
Partners in Care, Home First and Building Resilience. 
Ensuring that our systems are as simple and efficient as possible, working
with partners, to keep people safe from harm during an emergency
response as required by legislation. 
(b) Policy and Legal 
The Civil Contingencies Act 2004 outlines a single framework for civil
protection in the UK. Part 1 of the Act established a clearly defined set of
roles and responsibilities for specified organisations involved in
emergency preparedness and response, known as Category 1
responders. Moray Integration Joint Board is a Category 1 responder.
Page 97

Page 98

HSCM resilience and preparedness is the responsibility of the Chief
Officer. The Corporate Manager is responsible for acting as the point of
contact for Moray and for driving forward all matters relating to civil
contingencies and resilience within HSCM. 
(c) Financial implications 
There are no financial implications directly associated with this report.
Although during any emergency response will require financial resource
from potentially both partners.  
(d) Risk Implications and Mitigation 
There is currently a High risk held on the HSCM Risk Register, detailing
the lack of a Civil Contingencies Subject Matter Expert to drive this
workstream. 
This also increases the risk of MIJB not complying, posing legislative risks
for the Moray IJB. 
There is also a medium risk against the ability to deliver a Care for People
Strategy. It is likely that this risk will be reconsidered following the exercise
of this plan in Moray and Grampian. 
(e) Staffing Implications 
None directly associated with this report. 
(f) Property 
None directly associated with this report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as there are no changes to
policy arising from this report and therefore there will be no differential
impact on people with protected characteristics. 
(h) Climate Change and Biodiversity Impacts 
None directly associated with this report. 
(i) Directions 
None directly associated with this report. 
(j) Consultations 
The following partners were also consulted in the writing of this report and
views incorporated: Moray Council Emergency Planning Officer and
Interim Support Manager, HSCM.  
6.  CONCLUSION 
Page 98

Page 99

6.1 This report provides MIJB with assurance that HSCM has an operational
framework for activating the Care for People Plan and it is exercised as
required. This is MIJB’s responsibility as a Category 1 Responder in
terms of the Civil Contingencies Act 2004. 
Author of Report:  Sonya Duncan, Corporate Manager, HSCM 
Background Papers: The Civil Contingencies Act 2004 (Contingency
Planning) (Scotland) Regulations 2005
Preparing Scotland, Care for people affected by
emergencies
Page 99

Page 100

APPENDIX A 
Care for People (CfP) Response Framework 
Local Resilience Partnership (LRP) - CfP Strategic Objectives 
• Save lives and minimise health harm.
• Protect the health, safety, and wellbeing of staff and public.
• Minimise impacts on normal services. 
Purpose of the Care for People Team
The purpose of the Team is to provide a single point of reference for preparation and
caring for people affected by emergencies within the affected area. 
It will care for people before, during and after emergencies by establishing and
sustaining formal partnerships to co-ordinate its joint activity. It will ensure that its
members own and maintain their arrangements, and are fully prepared to respond to
emergencies at all times care-for-people-affected-by-emergencies-november-2017.pdf
(ready.scot)
The Team will: 
• advise and inform the decisions of the Resilience Partnership; 
• implement the Resilience Partnership strategies by co-ordinating its
members’ activities;
• deliver services through its members’ staff working at an operational level
• identify and provide support to people identified has potentially being
vulnerable 
Abbreviations:
MERC – Moray Emergency Response
Coordinator 
SMOC – Senior Manager on Call 
IMT – Incident Management Team LRP – Local Resilience Partnership 
CfP – Care for People  OOH – Out of Hours
PARD – Persons at Risk - same as Vulnerable
Persons List
CWSO – Chief Social Work Officer
HOS – Head of Service
Item 13.
Page 100

Page 101

APPENDIX A 
Care for People – Chair Information Card
Chair of the Care for People Group: Depute Chair:
Chief Social Work Officer (CSWO) or
Head of Service (HOS)
Senior Manager
Out of Hours: The Senior Manager on Call (SMoC) may choose to chair this group initially
Notification Process
You will be notified of the need for CfP group via one of the following routes:
• Local Resilience Partnership (LRP) meeting
• Moray Council (MC) Incident Management Team (IMT) 
• directly from the Moray Council Manager on Call (MERC). 
Responsibilities of the Chair of the group
1. Call out the Moray CfP team
2. Set priorities for the team
3. Allocate Leads for various groups/workstreams
4. Allocate any additional work and note 
5. Ensure accurate notes/action log are kept of all meetings
6. Provide advice and information, where required, to the LRP and IMT 
7. Liaise with the Moray Emergency Response Co-ordinator (MERC), the Senior
Manager on Call (SMoC) as appropriate 
You will also be responsible for representing the Moray CfP response as part of
the Grampian Care for People Group. 
Ensure the group works in a multi-agency approach to ensure those affected by
the emergency are supported as appropriate 
The incident may result in a Public or Fatal Accident Inquiry; therefore, it is
essential that accurate records are kept, including times of events,
discussions and decisions made and actions taken. Just as important may
be the decisions/actions not made! 
Page 101

Page 102

APPENDIX A 
Setting up a meeting
1. When deciding who to call-in/involve in response to an incident, follow the
principle of ‘cautious over-response’ in the initial stages.
2. Schedule a Moray CfP meeting for approx. 30 mins after LRP/IMT meeting
(whichever is first, this will depend on the type and location of incident) 
3. As soon as notification of an ‘issue’ is received call the CfP groups first
meeting using the Moray Control Room email - better to stand it down if not
required. Use the METHANE form to help capture the valuable information
(Appendix 2)
4. Check all On Call Managers for Moray are included in the invite.
5. HSCM Control Room has a distribution list and draft email pinned to the top
of the inbox to alert staff (you many need to add people to this after the first
meeting).
6. Any papers sent from the LRP, or wider distribution will be sent to the Control
Room email (all SMOCs have access to this email – this does not affect the
notification process). This ensures one central point for information. (This will
ensure if there is a need to hand over during an incident that all papers from
external agencies are kept in one place, also central for the debrief that will
follow).
7. Appoint admin. Support (this will need to be decided for each event – there is
no dedicated resource – there is no out of hours support available). 
▪ The full scale and impacts of an incident may not be known for some time: it is
easier to stand-down resources if not needed than to try to manage an incident
without essential elements of response that may be required.
▪ Remember that you may need to sustain a response over a prolonged period:
ensure you arrange staffing to allow for continuity of response over multiple
shifts. Recommended shift maximum is 8 hours.
▪ Moray Council will facilitate Rest Centres or Information Hubs as part of this
process 
It is not recommended to consider scaling back a response until the
details are known and the impacts and consequences have been
assessed.
Reminders:
➢ Remember to keep a Personal log (Appendix 1)
➢ Remember to keep a Decision log of any decisions you make – including
decisions not to act on something! (Appendix 3)
➢ Remember, do I have what I need if I have to defend a decision later!
➢ Record who/where/why/what!
➢ Remember to communicate with your colleagues/teams! 
Remember to use full date and times (24-hour format). 
Page 102

Page 103

APPENDIX A 
General Questions to consider:
• Do I need to contact anyone within DGH/other parts of the system?
• Are there any other partners I need to notify / who could help?
• Remember to delegate – your job is to Chair the group – not to do everything!
• Have we agreed who will share which information where? 
Have you considered the following teams: 
GMED
Pharmacy
Primary Care
Mental Health Services
Dr Gray’s 
Partners e.g. Moray Council/Aberdeenshire/Aberdeen City/NHSG/Police etc.
OOH teams e.g. nursing/social work 
General Information: 
Information governance: a pragmatic, sensible and balanced approach to data
protection and sharing should be taken. It is more likely than not, that it will be in
the interests of the individual that their personal data is shared. The starting point
is to consider the harm that may be caused if information is not shared. 
When deciding to share information, or not, the reasons must be
recorded. If the decision is to share information, then a record must be kept
of the information shared and with whom it was shared. 
Page 103

Page 104

APPENDIX A 
Meetings Information Card
Grampian Local Resilience Partnership (GLRP) sometimes referred to as
LRP
• MERC will be the principal point of contact for the LRP during the incident. 
• The SMoC or deputy should attend for HSCM as a Category 1 responder (it is
our duty to also attend). 
Depending on the scale of the incident there would be a requirement for
representation at Partner response meetings and LRP groups - this may be
delegated as necessary. 
Grampian CfP
• If an incident is declared by the LRP, Grampian CfP may be a subgroup of the
LRP to support a coordinated response. 
• SMOC/HOS/CSWO will lead (or deputise) the Moray CfP response and chair
HSCM CfP meetings – to be decided on the day.  
• HSCM will have primary responsibility for chairing the delivery of the CfP
requirements with MC in partnership. 
• HSCM will identify people who are potentially vulnerable and consider how best
to support them if necessary, using the PARD (Appendix 6) 
During an incident/response the Grampian CfP group will agree a chair from one of
the three HSCP’s. There may be a request from Moray to chair the Grampian
group. This group is likely to be stood up from the LRP if it is felt there is a need to
co-ordinate to/from the local CfP groups and between other partners e.g.
COTAG/SSEN/SGN. It is not the intention to replicate the local CfP groups. 
Incident Management Team (IMT)
• You will be expected to take 
o details clients who have been contacted/
o if any require help
o if you need assistance to the IMT. 
The MERC will want assurance/status of the CfP group (spreadsheet in SMoC grab
bag on teams' channel)
• If the Incident is at local response level and not LRP level, then a MC/HSCM IMT
would be called. The IMT chair will be the MERC. CfP chair and SMOC would
be group members (it may be the same person initially).
• If the SMoC wishes to call an IMT they should contact the MERC who will
convene and chair the IMT. An IMT will only be called for an incident that
cannot be handled as business as usual
The IMT will be the Strategic group with CfP group working at an operational
delivery level feeding back into the IMT. Be careful not to give the same person too
many roles! 
Page 104

Page 105

APPENDIX A 
How to establish an Initial Incident Management Team (IMT) meeting 
In hours  Out of hours 
HOS or SMoC Authorises activation of
HSCM bronze control room (CR) but
may deputise Chair role. 
SMoC will contact all out of hours
managers and provide an initial briefing
of situation
- Details on Rotawatch 
Provide initial briefing of incident (details
on APPENDIX 2) for distribution to OMT
and set up Teams meeting for initial
management team meeting. 
There are no out of hours arrangement
for advisor / admin support – someone
will need to be identified for this function 
In hours - identify a manager and
admin support/loggist etc 
Page 105

Page 106

APPENDIX A 
Information Card – Communications
If scale of incident requires it: - 
Contact Council MERC to advise of situation and determine scale of response
required and location of control. 
If declared as a Major incident a single Control area will be established for MC and
HSCM – (potentially Council Annex Building) 
If the incident is a power outage this may need to move to any area that can operate,
e.g. annexe building – others to be identified..
In Hours: Out of hours 
For any emergency/disruptive incidents
where an IMT/CFP group is stood up,
corporate comms must be notified.
Email:
gram.moraycontrolcentre@nhs.scot
For IMT/CfP contact Moray Council
pr@moray.gov.uk (Fri 1600-Mon 0800.
Any other out of hours liaise with
MERC). 
Liaise with MC/NHSG at
pr@moray.gov.uk  and
gram.commscentre@nhs.scot
If Health related contact on call NHSG
duty press officer out of hours via
switchboard 0345 456 6000 
Health and Social Care Moray does not
have out of hours comms team.
Page 106

Page 107

APPENDIX A 
(APPENDIX 1)  
PERSONAL LOG
Name  Designation: 
Role in Response:  Date:  Time: 
Event: 
Time  Narrative 
Signature 
Page 107

Page 108

APPENDIX A 
M/ETHANE Form (APPENDIX 2)
Time  Date 
Organisation  
Name of Caller  Tel No 
M Major
incident
Has a Major Incident been
declared? 
YES/NO
(If no, then complete
ETHANE message) 
E Exact
Location 
What is the exact location or
geographical area of incident 
T Type of
Incident
What kind of incident is it? 
H Hazards What hazards or potential
hazards can be identified? 
A Access What are the best routes for
access and egress? 
N Number of
casualties
How many casualties are
there and what condition are
they in? 
E Emergency
Services
Which and how many
emergency responder
assets/personnel are
required or are already on-
scene? 
Restricted once complete
Signature 
Page 108

Page 109

APPENDIX A 
DECISION LOG 
GUIDE (APPENDIX 3)
This template is for use either in place of or as an addition to the existing DECISION
LOGBOOK.
The template is primarily for use during virtual circumstances so that an accurate
record is kept of all decisions made and to ensure clear governance.
The Decision Loggist should follow these steps:
1.
During the meeting or conversation, record decisions made as per
the template below. 
2.
On conclusion of the meeting or conversation, and when the
Decision Loggist is satisfied that the Decision Log has been
completed accurately, the Decision Log should be sent to the
Decision Maker by email (email template below). This should be
done on the same day as the meeting/conversation occurred and
as soon as possible afterwards. 
3.
On receipt of the Decision Log from the Decision Loggist, the
Decision Maker should check that the Log is a true record of
decisions made during the meeting or conversation. 
4.
When the Decision Maker is satisfied that the Decision Log is
accurate and complete, then he/she should sign it virtually in the
appropriate field of the form as acknowledgement and return it by
email reply to the Decision Loggist. 
5.
On receipt of the returned and approved Decision Log, the
Decision Loggist will file it as ‘FINAL,’ to protect it, and file it
appropriately in the folder which should be set up in the files of that
MS ‘Team.’ It can also be filed in the relevant network filing
systems relating to the Decision Maker or Group to which it
relates. 
6.
Email exchanges in relation to the Decision Logs should be filed
appropriately as defined by that the Decision Maker or
Group/Sector, including within network filing systems and MS
Teams. 
7.
The Decision Maker and Decision Loggist should ensure they
each keep a copy of the Decision Log and all the email dialogue. 
Page 109

Page 110

APPENDIX A 
DECISION LOG (APPENDIX 4)
TITLE 
LOG
START DATE 
INCIDENT
START
DATE 
END DATE  END DATE 
START TIME  START
TIME 
END TIME  END TIME 
DECISION MAKER 
SERVICE/GROUP 
RECORDED BY
(Loggist) 
DATE 
TIME 
INCIDENT 
PROBLEM 
OPTIONS 
Page 110

Page 111

APPENDIX A 
OUTCOME/
ACTIONS 
RATIONALE 
DECISION
MAKER
APPROVAL
I confirm that this is a true record of decisions I
made during the meeting /conversation specified.
NAME 
DATE OF APPROVAL 
TIME OF APPROVAL 
DATE RETURNED TO DECISION
LOGGIST 
DATE RECEIVED AND FILED BY
DECISION LOGGIST 
REMEMBER TO PROTECT DOCUMENT AS ‘FINAL’ ONCE DECISION MAKER HAS
SIGNED THE DOCUMENT 
Page 111

Page 112

APPENDIX A 
Care for People - Incident Management Team
Agenda 
Date:                                                                     Time: Lead
1.0 Welcome and Introduction, including apologies Chair
2.0 Matters requiring urgent attention – update from LRP/IMT  All
3.0 Review Decision Log All
4.0 Current situation/Partner Updates (3MB by exception only)
a) LRP
b) MERC/Council
c) HSCM
d) NHSG
e) Other partners 
All
5.0 Identify current and future risks from updates: - 
5.1 Options after discussion: - 
5.2 Agreed Outcome / Actions: - 
6.0 Staff Welfare  All
7.0 RESPONSE (& RECOVERY) STRATEGY
7.1 Agree Priorities (include Rationale)  Chair
7.2 Allocate Tasks (By whom/By when/Allocate resources)  Chair
8 Communications
Who has been informed of the situation and what have they been told?
8.1 Identify Liaison officer requirements (for attendance at partner
meetings)
Chair
8.2 Summarise Actions and Update Action Tracker/Decision Log  Chair
8.3 Items requiring escalation to LRP Chair
9.0 AOCB All
10.0 Agree Future Meeting Schedule Chair 
At end of meeting Chair to review decision log and sign
Data protection and sharing guidance for emergency planners and responders - GOV.UK
(www.gov.uk)
Page 112

Page 113

APPENDIX A 
PERSONS AT RISK DATABASE (PARD) INFORMATION – DRAFT (Appendix 6)
What is PARD? 
Scottish Government refer to PARD as a database of people who may be at risk
during an emergency. However, no actual database exists. Within HSCM we
utilise the data on the Care First system that identifies service users who may fall
into this category, Aberdeenshire and City use similar systems.
The purpose of this data is to provide managers with information on people who
may be vulnerable during or in the immediate aftermath of an emergency,
individuals who may be less able to help themselves in an emergency.
Agreed Vulnerabilities in Grampian (adapted from information provided by
Scottish Government’s “ten vulnerabilities”)
Physically Impaired 
Unable to walk unaided 
Requires walking aid and supported evacuation 
Manual or powered wheelchair 
Bed bound 
House bound 
Visually Impaired 
Significant sight impairment with a reliance of technology to support daily
Communication 
Hearing Impaired 
Significant hearing impairment with a reliance of technology to support daily
communication 
Lip reader 
BSL first language 
Long Term Conditions 
Impaired motor skills/neurological conditions 
Cognitive impairment 
Mental Health Condition resulting in impairment 
Learning disability 
Dementia 
Reliance on Powered Machinery 
Those who rely on electrical equipment for health and social care needs 
OT equipment (hoist, air mattress, bed, riser-recliner chair) 
Oxygen 
Feeding tube 
Dialysis 
End of life care 
What is the process for the Vulnerable People List
• Care at Home will contact all clients and record any issues on the Staff Plan
system (see Appendix 7)
• Identify which managers will be responsible for attending 
o Care for People Group meetings or 
o IMT for feedback/updates.
Page 113

Page 114

APPENDIX A 
Dependant on the incident additional people may become vulnerable by their direct
involvement in the incident – we have a duty to gather their information and include
them too.
_________________________________________
How to access the PARD data:
HSCM currently extracts a list from Care First every Friday that is held on
SharePoint on the MC system for information governance purposes. The relevant
care teams have access to their data on the Care First system (see appendix 7)
Information Governance rules mean that the information cannot be shared until an
incident is declared. 
In the event that access to the system is lost, there is a printed paper copy kept
within a secure area of the annexe building that all members of the team know how
to access.
Work In Progress:
Agreed to implement the use of the Risk Matrix presented at OMT, plan to be put in
place to arrange for the necessary work to commence.
AK will look at improving the format of the spreadsheet stored on SharePoint to
accommodate columns for recording who contact was made with and whether they
require assistance e.g. 12hrs/24hrs etc.
Further work is ongoing to identify whether data from the SPAARA system
(identifying those most at risk of readmission to a care facility) can be of benefit to
this process (Grampian group)
SD working with tech services and med. Physics to identify which home equipment
would be suitable for use with portable batteries in the event of a power failure –
Shire and City also involved in this work.
In the event of a power outage SSEN will provide updates at 10am and 2pm.
Children and Young People
Responders should be trained to recognise and respond to the needs of children
affected by emergencies, whether or not they work with children normally 
(Note: LVZ advised that C+F pull their lists every two weeks and keep paper copies
– this is specialised and should remain with Children’s Services)
Displaced Persons
Agreed by Chief Officers at NHSG Civil Contingencies meeting 5/12/23 that
Displaced Persons/Asylum Seekers will be looked after as part of the Care for
People arrangements 
Page 114

Page 115

APPENDIX A 
PARD PROCESS – DRAFT DOCUMENT    
APPENDIX 7 
Page 115

Page 116

DRAFT
REPORT TO: MORAY INTEGRATION JOINT BOARD ON 25 JANUARY 2024 
SUBJECT: RESERVES POLICY - REVIEW 
BY:  CHIEF FINANCIAL OFFICER 
1. REASON FOR REPORT 
1.1 To seek approval from the Board on its Reserves Policy. 
2. RECOMMENDATION 
2.1 It is recommended that the Board: 
i) approves the Reserves Policy as detailed at Appendix 1; and 
ii) agrees that the next review will be no later than March 2025. 
3. BACKGROUND 
3.1 The Public Bodies (Joint Working) (Scotland) Act 2014 empowers Integration
Authorities to hold reserves which should be accounted for in their financial
accounts. 
3.2 The Moray Integration Joint Board (MIJB) is subject to the audit and accounts
regulations and legislation of a body under Section 106 of the Local
Government (Scotland) Act 1973 and is classified as a local government body
for accounts purposes by the Office for National Statistics. 
3.3 The MIJB has previously considered the purpose and use of reserves and
approved its initial Reserves Policy at a meeting of the Board on 31 March
2016 (para 12 of the minute refers) with updates being prepared for
consideration and approval on 25 January 2018 (para 7 of the minute refers),
31 January 2019 (para 8 of the minute refers), 30 January 2020 (para 11 of
the minute refers), 27 January 2022 (para 14 of the minute refers) and 26
January 2023 (para 14 of the minute refers).  A further review was due no
later than March 2024, so the paper and policy at Appendix 1 is to be
considered within the agreed timeframes. 
3.4 Reserves are required to be considered and managed to provide security
against unexpected cost pressures and financial stability.
Item 14.
Page 116

Page 117

4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The MIJB Reserves Policy has been reviewed and it remains extant with no
requirement for any amendments at this current time and is presented as
Appendix 1 to this report.   
4.2  The Reserves Policy outlines the importance of holding reserves for the long
term financial stability of the MIJB to manage pressures from year to year. 
The MIJB Integration Scheme highlights the process to be followed in
circumstances where it is anticipating an overspend position in that
uncommitted reserves would firstly be used to address any overspend.  With
the Scheme in mind, by the end of the 2023/24 financial year the MIJB is not
expected to hold any remaining uncommitted general reserves.   
4.3 The funding clawbacks by the Scottish Government in the 2022/23 financial
year resulted in a significant decrease in the earmarked reserve for the MIJB
of £4.7 million from £17 million in 2021/22.   During 2023/24, funding has
continued to be drawn-down from these reserves as appropriate.   
4.4 In reviewing the Reserves Policy it is necessary to consider both the scale of
the MIJB responsibilities and the financial climate it is operating within.  The
Reserves Policy approved by this Board on 31 January 2019 agreed 2% as
being the prudent level of general reserve to be held (Para 8 of the minute
refers). As the end of the 2023/24 financial year approaches, there is a
forecast overspend position from which it is evident that 2% will not be
achievable in the short-term.  With this in mind, the review of the Reserves
Policy has resulted in the percentage of general reserves to be unspecified
and that over the medium term, the MIJB should be seeking to ‘hold a prudent
level of general reserves’. 
4.5  It will be necessary to ensure that the Reserves Policy is kept under review
with the expectation that in future years, an appropriate level of reserves can
be maintained. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan ‘Moray Partners in Care 2022 – 2032’
The Integration Scheme sets out the requirement for the MIJB to
determine the treatment for underspends and the necessity to detail this
within an agreed policy.  The Reserves Policy makes appropriate
reference to the MIJB Strategic Plan. 
(b) Policy and Legal
The Public Bodies (Joint Working) (Scotland) Act empowers the MIJB to
hold reserves and in doing so requires a strategy to support the process. 
(c) Financial implications
None arising directly from this report. 
Page 117

Page 118

(d) Risk Implications and Mitigation
The establishment and maintenance of a Reserves Policy, promotes
sound financial management practice and supports good governance. 
(e) Staffing Implications
None arising directly from this report. 
(f) Property
None arising directly from this report. 
(g) Equalities/Socio Economic Impact
None arising directly from this report as there has been no change to
policy. 
(h) Climate Change and Biodiversity Impacts
None arising directly from this report. 
(i) Directions
There are no directions arising from this report. 
(j) Consultations
The Chief Officer has been consulted and comments have been
incorporated within this report. 
6. CONCLUSION 
6.1 The Reserves Policy continues to be reviewed in line with published
guidance and good governance principles. 
Author of Report: Deborah O’Shea, Interim Chief Financial Officer
Background Papers:  with author
Ref: 
Page 118

Page 119

APPENDIX 1                                                       
MORAY INTEGRATION JOINT BOARD 
RESERVES POLICY 
Date Created 
February 2016 
Date Implemented 
1 April 2016
Next Review Date 
March 2025 
Developed By
Chief Financial Officer 
Reviewed By
Chief Officer 
January 2024 
Approved By
MIJB 
January 2023 
VERSION5.1  
Item 14.
Page 119

Page 120

APPENDIX 1
CONTENTS 
Background             3 
Statutory/Regulatory Framework for Reserves       3 
Operation of Reserves                4 
Role of the Chief Financial Officer        4 
Adequacy of Reserves          4 
Reporting Framework          5 
Accounting and Disclosure         5 
Page 120

Page 121

APPENDIX 1
1. Background 
1.1  In July 2014, CIPFA through the Local Authority Accounting Panel (LAAP)
issued guidance in the form of LAAP bulletin 99 - Local Authority Reserves and
Balances in order to assist local authorities (and similar organisations) in
developing a framework for reserves.  The purpose of the bulletin is to provide
guidance to local authority chief finance officers on the establishment and
maintenance of local authority reserves and balances in the context of a
framework, purpose and key issues to consider when determining the
appropriate level of reserves. 
1.2 The Moray Integration Joint Board (MIJB) is subject to the audit and accounts
regulations and legislation of a body under Section 106 of the Local
Government (Scotland) Act 1973 and is classified as a local government body
for accounts purposes by the Office for National Statistics (ONS).  The MIJB is
able to hold reserves which should be accounted for in the financial accounts
of the Board. 
1.3 The purpose of this Reserves Policy is to:
• Outline the legislative and regulatory framework underpinning the creation, use
or assessment of the adequacy of reserves;
• identify the principles to be employed by the MIJB in assessing the adequacy
of the its reserves;
• indicate how frequently the adequacy of the MIJB’s balances and reserves will
be reviewed and;
• Set out arrangements relating to the creation, amendment and the use of
reserves and balances. 
1.4 In common with local authorities, the MIJB can hold reserves within a usable
category. 
2. Statutory / Regulatory Framework for Reserves 
Usable Reserves 
2.1  Local Government bodies - which includes the MIJB for these purposes - may
only hold usable reserves for which there is a statutory or regulatory power to
do so. In Scotland, the legislative framework includes: 
Usable Reserve -   Powers   
General Fund -  Local Government (Scotland) Act 1973 
2.2  For each reserve there should be a clear protocol setting out: 
• the reason / purpose of the reserve; 
• how and when the reserve can be used; 
• procedures for the reserves management and control; and 
• The timescale for review to ensure continuing relevance and adequacy. 
Page 121

Page 122

APPENDIX 1 
3.  Operation of Reserves
3.1  Reserves are generally held for three main purposes:
• to create a working balance to help cushion the impact of uneven cash flows
and avoid unnecessary temporary borrowing – this forms part of general
reserves;
• to create a contingency to cushion the impact of unexpected events or
emergencies – this also forms part of general reserves; and
• to create a means of building up funds, often referred to as earmarked reserves,
to meet known or predicted liabilities. 
3.2  The balance of the reserves normally comprise of the following elements: 
• funds that are earmarked or set aside for specific purposes. In Scotland, under
Local Government rules, the MIJB cannot have a separate earmarked reserve
within the Balance Sheet, but can highlight elements of the General Reserve
balance required for specific purposes. The identification of such funds can be
highlighted from a number of sources: 
• future use of funds for a specific purpose, as agreed by the MIJB; or   
• commitments made under the authority of the Chief Officer, which cannot be
accrued at specific times (e.g. year-end) due to not being in receipt of the
service or goods; 
• funds which are not earmarked for specific purposes, but are set aside to deal
with unexpected events or emergencies; and      
• funds held in excess of the target level of reserves and the identified earmarked
sums. Reserves of this nature can be spent or earmarked at the discretion of
the MIJB. 
4. Role of the Chief Financial Officer 
4.1  The Chief Financial Officer is responsible for advising on the target level of
reserves that the MIJB would aim to hold, known as the prudential target
figure. The MIJB, based on this advice, should then approve the appropriate
reserve strategy as part of the budget process. 
5.  Adequacy of Reserves 
5.1 There is no guidance on the minimum level of reserves that should be held. In
determining the prudential target, the Chief Financial Officer must take account
of the strategic, operational and financial risks facing the MIJB over the medium
term and the MIJB’s overall approach to risk management. 
Page 122

Page 123

APPENDIX 1
5.2  In determining the prudential target, the Chief Financial Officer should consider
the MIJB’s Strategic Plan, the medium term financial strategy and the wider
financial environment. Guidance also recommends that the Chief Financial
Officer reviews any earmarked reserves as part of the annual budget process
and continued development of the Strategic Plan. 
5.3  In light of the size and scale of the MIJB’s responsibilities, over the medium
term it is proposed to hold a prudent level of general reserves. This value of
reserves must be reviewed annually as part of the MIJB’s Budget and Strategic
Plan; and in light of the financial environment at that time. The level of other
earmarked funds will be established as part of the annual financial accounting
process. 
6. Reporting Framework 
6.1   The Chief Financial Officer has a fiduciary duty to ensure proper stewardship
of public funds. 
6.2  The level and utilisation of reserves will be formally approved by the MIJB
based on the advice of the Chief Financial Officer. To enable the MIJB to reach
a decision, the Chief Financial Officer should clearly state the factors that
influenced this advice. 
6.3 As part of the budget report the Chief Financial Officer should state: 
• the current value of general reserves, the movement proposed during the year
and the estimated year-end balance and the extent that balances are being
used to fund recurrent expenditure;
• the adequacy of general reserves in light of the MIJB’s Strategic Plan, the
medium term financial outlook and the overall financial environment;
• an assessment of earmarked reserves and advice on appropriate levels and
movements during the year and over the medium term; and
• If the reserves held are under the prudential target, that the MIJB should be
considering actions to meet the target through their budget process. 
7.  Accounting and Disclosure 
7.1 Expenditure should not be charged direct to any reserve. Any movement within
Revenue Reserves is accounted for as an appropriation and is transparent. 
Entries within a reserve are specifically restricted to ‘contributions to and from
the revenue account’ with expenditure charged to the service revenue account. 
Page 123

Page 124

MINUTE OF MEETING OF THE AUDIT, PERFORMANCE AND RISK COMMITTEE 
Thursday, 31 August 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Mr Simon Bokor-Ingram, Councillor John Divers, Mr Graham Hilditch, Councillor Scott
Lawrence, Mr Derick Murray, Ms Deborah O'Shea, Mr Sandy Riddell 
APOLOGIES 
Mr Sean Coady, Ms Sonya Duncan, Mr Stuart Falconer 
IN ATTENDANCE 
Also in attendance at the above meeting were the Head of Service/Chief Social
Work Officer, Provider Services Manager, Chief Internal Auditor, Michelle Fleming,
Self Directed Support and Unpaid Carers Officer, Angela Pieri, External Auditor and
the Democratic Services Manager.  
1.         Chair 
The meeting was chaired by Councillor Scott Lawrence.  
2.         Declaration of Member's Interests 
Mr Riddell declared an interest as he is Chair of the Mental Welfare Commission.  The
Committee noted that there were no other declarations of member's interests.  
3.         Minute of Special Meeting on 29 June 2023 
The minute of the special meeting of the Audit, Performance and Risk Committee on
29 June were submitted and approved.  
4.         Minute of meeting of 29 June 2023 
The minute of the meeting of the Audit, Performance and Risk Committee on 29 June
were submitted and approved.  
Page 124

Page 125

5.         Action Log of Meeting of 29 June 2023 
The action log of the meeting of 29 June 2023 was discussed and updated.  
6.         Quarter 1 Performance Report 
A report by the Interim Strategy and Planning Lead updated the Committee on
performance as at Quarter 1 (April to June 2023).  
Mr Riddell continued to raise concern about the huge pressure on the mental health
service both on staff and patients and sought assurances on what is being done to
improve the situation.  He further added that the performance information on mental
health services needs to be improved.  
He further raised concerns about staff wellbeing and that self management is how both
organisations are working to improve wellbeing.  He added that there is probably lots
of work being carried out to help support the staff wellbeing but he felt it would be
helpful for the Committee to get an update on what is going on.  
Following consideration the Committee agreed to note:  
i) the performance of local indicators for Quarter 1 (April to June 2023) as
presented in the Performance Report at Appendix 1; and 
ii)
the analysis of the local indicators that have been highlighted and actions being
undertaken to address performance that is outside of acceptable target ranges
as detailed in Appendix 1.  
7.         Internal Audit Section Update 
A report by the Chief Internal Auditor asked Committee to consider the contents of the
report; seek clarification on any points noted.  
Following consideration the Committee agreed to note the audit update.  
8.         Strategic Risk Register 
A report by the Chief Officer provided an overview for the Committee on the current
strategic risks, along with a summary of actions which are in place to mitigate those
risks, updated August 2023.  
Following consideration the Committee agreed to:  
i) note the updated Strategic Risk Register included in Appendix 1; and    
ii) note the Strategic Risk Register will be further refined to align with the
transformation, redesign and delivery plans as they evolve.  
9.         Update on Improvement Plan for Adult Social Care Commissioning 
A report by the Head of Service/Chief Social Work Officer updated the Committee on
progress regarding the improvement plan for Adult Social Care Commissioning in line
with the external review conducted by KPMG, finalised in February 2023, since the last
Committee meeting on 29 June 2023.  
Page 125

Page 126

Following consideration the Committee agreed to note:  
i) the actions within the report; and 
ii) that further updates will be provided at the next Committee meeting, along with
an updated Improvement plan. 
10.         Internal Audit Section Completed Projects 
A report by the Chief Internal Auditor provided an update on audit work completed since
the last meeting of the Committee.  
Following consideration the Committee agreed to note the audit update.  
11.         Self-Directed Support Option 1 Audit Update 
A report by the Service Manager, Provider Services informed the Committee in relation
to the progress of the current work being undertaken to achieve the recommendations
outlined in the most recent internal audit report regarding Self-Directed Support (SDS)
Option 1.  
Following consideration the Committee agreed to note the current progress relating to
the Self Directed Support Option 1 audit report.  
12.         Self-Directed Support Option 2 and 3 Audit Update 
A report by the Service Manager, Provider Services informed the Committee in relation
to the progress of the current work being undertaken to achieve the recommendations
outlined in the most recent internal audit report relating to SDS Option 2 and 3 delivery.  
Following consideration the Committee agreed to note the current progress relating to
the Self Directed Support (SDS) Option 2 and 3 audit report.  
13.         Client Monies Audit Update 
A report by the Head of Service/Chief Social Work Officer informed the Committee of
progress against recommendations outlined in the November 2022 Client Monies
Internal Audit report.  
Following consideration the Committee agreed to note the current progress relating to
Client Monies Internal Audit Report.  
14.         Items for Escalation to MIJB 
The Committee noted that there were no items for escalation to the Moray Integration
Joint Board.  
In response to Mr Riddell's concern about the mental health services, the Chief Officer
suggested holding a Development Session on the topic prior to bringing a report to the
IJB.  
Mr Riddell confirmed that the Development Session would be really helpful to
understand the pressures however it was important that the issues, what is being done
etc is all minuted to ensure governance.    
Page 126

Page 127

The Chief Officer confirmed that the Development Session would explore all areas
before a fuller report to the Board. 
Page 127

Page 128

MINUTE OF MEETING OF THE CLINICAL AND CARE GOVERNANCE
COMMITTEE 
Thursday, 31 August 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Mr Ivan Augustus, Professor Siladitya Bhattacharya, Councillor Peter Bloomfield, Mr
Simon Bokor-Ingram, Mr Graham Hilditch, Councillor Scott Lawrence, Dr Robert
Lockhart, Mr Derick Murray, Ms Deborah O'Shea, Ms Fiona Robertson, Dr Malcolm
Simmons, Ms Tracy Stephen, Mr Kevin Todd 
APOLOGIES 
Professor Duff Bruce, Mr Sean Coady, Ms Elizabeth Robinson, Mrs Val Thatcher 
IN ATTENDANCE 
Bridget Coutts, Lead Nurse, GMED, Shelley Taylor, Service Manager Children and
Families, Vicky Low, Interim Public Protection Lead Officer, Rosemary Reeve,
Interim Primary Care Development Manager, Michelle Fleming, Self Directed
Support and Unpaid Carers Officer, Fiona Robertson, Chief Nurse - Moray,  Laura
Stevenson, Dental Clinical Lead and the Democratic Services Manager. 
1.         Chair 
The meeting was chaired by Mr Derick Murray.  
2.         Declaration of Member's Interests 
There were no declarations of Members' Interests in respect of any item on the agenda.  
3.         Action Log - 25 May 2023 
The Action Log of the meeting of 25 May 2023 was discussed and updated.    
Page 128

Page 129

4.         Minutes of meeting of 25 May 2023 
The minute of the meeting of 25 May 2023 was submitted and approved, subject to
an amendment at para 6 where it should read a report back to the Clinical Care and
Governance Committee and not Audit Performance and Risk.  
5.         Strategic Risk Register 
A report by the Chief Officer provided an overview of the Clinical and Care
Governance Committee of the current strategic risks, along with a summary of
actions which are in place to mitigate those risks, updated in August 2023.  
Mr Augustus, Carers Representative queried whether Unpaid Carers should be
included as a risk at a strategic level as a breakdown in care provided by unpaid
carers would result in care having to be provided from another source.  
In response, the Chief Officer agreed that the risk could be woven into the Risk
Register.  
Following further consideration the Committee agreed to note:  
i) the updated Strategic Risk Register included at Appendix 1; and    
ii) the Strategic Risk Register will be further refined to align with the
transformation, redesign and delivery plans as they evolve. 
6.         Quarter 1 Complaints Report 
A report by the Clinical and Care Governance Group Co-Chairs informed the
Committee of complaints reported and closed during Quarter 1 (1 April 2023 - 30
June 2023).  
Mr Augustus, Carers Representative sought clarification on how easy it is for the
public to complain as he has had people come to him not knowing where to go to
complain.  
In response the Head of Service confirmed that a lot of work has been done within
Children and Families and Justice Social Work to improve and highlight how
members of the public can complain and this is something that could be rolled out
over Adult Services.  
Following consideration, the Committee agreed to note the totals, lessons learned,
response times and actions taken for complaints completed within the last quarter.  
7.         Clinical and Care Governance Group Escalation Report 
A report by the Chief Nurse, Moray informed the Committee of progress and
exceptions reported to the Clinical and Care Governance Group since the last report
to Committee in May 2023.  The Chief Nurse, Moray updated the Committee to note
that 30 new graduate nurses will be starting employment in Moray, most will be
working in Dr Gray's Hospital in Elgin but a number will be working in the community.   
Page 129

Page 130

Councillor Lawrence sought an update on the funding carried forward to be used to
provide suitable accommodation for the Moray Integrated Drugs and Alcohol Service
and sought clarification on whether there was a requirement to return the funding if
not spent.  
In response, the Chief Officer confirmed that options for premises are being looked at
but there are difficulties in finding the suitable premises.  He further stated that there
is a risk that the money will need to be returned if it is not spent, however given that
tackling drugs and alcohol issues is a priority for the Scottish Government it is hoped
there would be some leeway with the funding.  
Following consideration the Committee agreed to note the contents of the report.  
8.         Progress Update in Relation to Unpaid Carers Strategy 2023-27 
A report by the Self Directed Support and Unpaid Carer Officer informed the
Committee of progress of the current work being undertaken inline with the Moray
Carers Strategy 2023-26 Implementation Plan.  
Mr Augustus, Carers Representative and Dr Simmons sought agreement for the
Improvement Plan to be presented to the Committee on a regular basis.  
The Chair agreed that the frequency of reporting should be discussed by the Chief
Officer, Self Directed Support Officer and Mr Augustus following the meeting.  
Following consideration the Committee agreed to note:  
i) the current progress relating to the Carers Strategy Implementation Plan; and    
ii) the impact on unpaid carers in Moray.  
9.         Adult Support and Protection Multi Agency Improvement Plan 
A report by the Interim Public Protection Lead Officer updated the Committee on
progress against the Adult Support and Protection Multi-agency Improvement Plan,
since the last update provided in may 2023.  
Following consideration the Committee agreed to note:  
i) the multi-agency Improvement Plan and progress to date;    
ii) the systems in place to monitor and progress actions within the plan;    
iii) Phase 2 of Adult Support and Protection Activity intention; and    
iv) that further updates will be provided to the next Committee meeting.  
10.         Out of Hours Nursing Service 
A report by the Chief Nurse, Moray informed the Committee of the current and
emerging situation regarding the Out of Hours Rapid Response Nursing Service
currently hosted by Aberdeenshire and delivered by Marie Curie across Moray and
Aberdeenshire.  
Following consideration the Committee agreed to note:
Page 130

Page 131

i) that notice has been given by Marie Curie in relation to the cessation of the
Rapid Response Out of Hours Nursing Service aspect of the current contract
as of 30 September 2023;    
ii) the requirement for NHS Grampian to deliver an Out of Hours Nursing Service
across Aberdeenshire and Moray in a two phased approach with the first
priority being to ensure that there is continuity of service provision beyond the
notice period of 30 September 2023 for a 6 month period to allow a full review
of the service delivery model;    
iii) Phase 1 - it is proposed that NHS Grampian deliver the joint Moray and
Aberdeenshire Model as an "in-house" service with the addition of a nursing
triage support aligned with the GMED service to support right care, right time
and the right person approach thereby improving the current Out of Hours
Nursing Service; and    
iv) Phase 2 - it is proposed that NHS Grampian, during Phase 1, review the full
service delivery model and consider a standalone Moray Out Of Hours Nursing
Care Service based on population need, geographical spread and how this will
align with a full 24 hour Nursing Care Service.  
11.         NHS Dental Provision in Moray 
A report by the Dental Clinical Lead informed the Committee about the current status
of NHS dental provision in Moray.  
Following consideration the Committee agreed to note the current challenges facing
NHS dentistry in Moray and nationally.  
12.         Moray Daytime Unscheduled Care Service 
A report by the Head of Service informed the Committee regarding progress made in
relation to Moray Daytime Unscheduled Care Service 10 week test of change
(January - March 2023).  
Following consideration the Committee agreed to note:  
i) the evaluation made in relation to the test of change; and    
ii) that the findings will be considered in the winter planning for 2023/24 and
incorporated in the General Practice (GP) Vision Project, looking at GP services
in their entirety.  
13.         Primary Care Minor Surgery 
A report by the Primary Care Development Manager informed the Committee of the
current position regarding the Moray Primary Care Minor Surgery Service.  
Following consideration the Committee agreed to note the current position of the
Primary Care Minor Surgery Service.    
Page 131

Page 132

14.         The Children's Services Plan 
A report by the Service Manager, Children and Families asked the Committee to note
the strategic intent of the Children's Services Plan 2023-26, following delegation of
Children and Families and Justice Social Work Services to the Moray Integration
Joint Board (MIJB) on 16 March 2023.  
Following consideration the Committee agreed to note:  
i) the Children's Services Plan 2023-26 at Appendix 1; and    
ii) that an Annual Progress Report will be presented to Committee for noting.  
15.         Health and Social Care Moray Annual Complaints Report 2022-23 
A report by the Chief Nurse, Moray provided the Committee with the Draft Health and
Social Care Moray (HSCM) Annual Complaints Report for 2022/23.  
Following consideration the Committee agreed to:  
i) note the contents of the annual report; and    
ii) request the annual report be submitted to Moray Integration Joint Board in
September for approval prior to publication.  
16.         Duty of Candour Annual Report 2022-23 
A report by the Chief Nurse, Moray updated the Committee on the Draft Duty of
Candour Annual Report for the year 2022/23.  
Following consideration the Committee agreed to note the content of the report.  
17.         Items for Escalation to MIJB 
The Committee noted that there were no items for escalation to the Moray Integration
Joint Board.   
Page 132