Democracy Spraffa

Agenda Document Pack - Moray Integration Joint Board - 26/10/2023

Moray Council · 26 October 2023
Back to Moray Integration Joint Board — 26 October 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Moray Integration Joint Board 
Thursday, 26 October 2023 
Council Chambers 
NOTICE IS HEREBY GIVEN that a Meeting of the Moray Integration Joint Board,
Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Thursday,
26 October 2023 at 11:30 to consider the business noted below. 
AGENDA 
1. Welcome and Apologies 
2. Declaration of Member's Interests 
3. External Auditors Report to Those Charged with
Governance
3 - 62
4. 2022-23 Audited Annual Accounts Report 63 - 134
5. Membership of Board and Committees 135 - 140 
Page 1

Page 2

MORAY INTEGRATION JOINT BOARD 
SEDERUNT 
Mr Dennis Robertson  (Chair)  
Councillor Tracy Colyer  (Vice-Chair)
Mr Derick Murray  (Voting Member)
Mr Sandy Riddell  (Voting Member)
Councillor Peter Bloomfield  (Voting Member)
Councillor Scott Lawrence  (Voting Member)
Councillor Ben Williams  (Voting Member)
Professor Caroline Hiscox  (Ex-Officio)
Mr Roddy Burns  (Ex-Officio)  
Mr Ivan Augustus  (Non-Voting Member)
Mr Sean Coady  (Non-Voting Member)
Ms Jane Ewen  (Non-Voting Member)
Mr Stuart Falconer  (Non-Voting Member)
Mr Graham Hilditch  (Non-Voting Member)
Dr Paul Southworth  (Non-Voting Member)
Mrs Val Thatcher  (Non-Voting Member)
Mr Simon Bokor-Ingram  (Non-Voting
Member)
Professor Duff Bruce  (Non-Voting Member)
Ms Sonya Duncan  (Non-Voting Member)
Dr Robert Lockhart  (Non-Voting Member)
Ms Deborah O'Shea  (Non-Voting Member)
Ms Elizabeth Robinson  (Non-Voting
Member)
Dr Malcolm Simmons  (Non-Voting Member)
Ms Tracy Stephen  (Non-Voting Member)
Mr Kevin Todd  (Non-Voting Member) 
Clerk Name: Caroline O'Connor
Clerk Telephone: 07779 999296
Clerk Email: committee.services@moray.gov.uk 
Page 2

Page 3

REPORT TO:   MORAY INTEGRATION JOINT BOARD ON 26 OCTOBER 2023 
SUBJECT: EXTERNAL AUDITORS’ REPORT TO THOSE CHARGED WITH
GOVERNANCE 
BY:  CHIEF FINANCIAL OFFICER 
1. REASON FOR REPORT 
1.1 To request the Moray Integration Joint Board (MIJB) consider the reports to
those charged with governance from the Board’s External Auditor for the year
ended 31 March 2023. 
2. RECOMMENDATION 
2.1 It is recommended that the MIJB considers and notes the reports from
the External Auditor within APPENDICES 1 and 2. 
3. BACKGROUND 
3.1 The responsibilities of Audit Scotland as the independent auditor are
established by the Local Government (Scotland) Act 1973, the code of Audit
Practice (2021), which can be found at Code of Audit Practice and
supplementary guidance, and are supported by the auditing profession’s
ethical guidance. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The work carried out by Grant Thornton during 2022/23 has produced two
reports that are subject to the consideration of those charged with
governance.  The reports are attached as follows: 
• Independent Auditors Report to those charged with governance
(APPENDIX 1)
• The Annual Audit Report 2022/23 (APPENDIX 2) 
4.2 The audit opinions expressed were all unqualified and are reported within the
‘independent auditors report’ included within APPENDIX 1. 
4.3 The Annual Audit Report included at APPENDIX 2 provides an Action Plan
where recommendations for improvement are made, based on the findings of
the review.  These recommendations have been discussed with management
Item 3.
Page 3

Page 4

and corresponding actions have been agreed, together with timescales for
completion. 
4.4 The Annual Audit Report provides a summary of the significant audit risks
identified during planning.  The results and conclusions of this work are noted
within the report. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Moray Partners in Care 2019 – 2029”
The work of the external auditor and the production of these reports for
those charged with governance have been completed within the
specified timescales agreed. 
(b) Policy and Legal
The Public Bodies (Joint Working ) (Scotland) Act 2014 requires that the
Moray Integration Joint Board (MIJB) is subject to the audit and accounts
provisions of a body under Section 106 of the Local Government
(Scotland) Act 1973. 
(c) Financial implications
There are no direct financial implications arising from this report. 
(d) Risk Implications and Mitigation
The external auditor, Audit Scotland, through the audit process, provides
assurance to the Board that the Annual Accounts for 2022/23 give a true
and fair view of the financial position.  The Annual Audit Report
highlights risks identified during the audit process and recommendations
for action that have been agreed by management. 
(e) Staffing Implications
None arising directly from this report. 
(f) Property
None arising directly from this report 
(g) Equalities/Socio Economic Impact
None arising directly from this report as there has been no resultant
policy change. 
(h) Climate Change and Biodiversity Impacts
There are no direct climate change and biodiversity implications as there
has been no change to policy. 
(i) Directions 
None arising directly from this report 
(j) Consultations
Consultation has taken place between Audit Scotland and the Chief
Financial Officer of the MIJB in preparation of the Annual Audit Report. 
Any comments received have been considered in writing this report.
Page 4

Page 5

6. CONCLUSION 
6.1 The External Auditor has issued an unqualified opinion for the 2022/23
Annual Accounts.  The Annual Audit Report, Independent Auditors’
Report and the Letter of Representation present the full findings. 
Author of Report: Deborah O’Shea, Interim Chief Financial Officer
Background Papers:  with author
Ref: 
Page 5

Page 6

Page 6

Page 7

APPENDIX 1 
Independent auditor’s report to the members of Moray
Integration Joint Board and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
We certify that we have audited the financial statements in the annual accounts
of Moray Integration Joint Board for the year ended 31 March 2023 under Part
VII of the Local Government (Scotland) Act 1973. The financial statements
comprise the Comprehensive Income and Expenditure Statement, Movement
in Reserves Statement, Balance Sheet and notes to the financial statements,
including significant accounting policies. The financial reporting framework that
has been applied in their preparation is applicable law and UK adopted
international accounting standards, as interpreted and adapted by the Code of
Practice on Local Authority Accounting in the United Kingdom 2022/23 (the
2022/23 Code).
In our opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the body as at 31
March 2023 and of its income and expenditure for the year then ended;
• have been properly prepared in accordance with UK adopted
international accounting standards, as interpreted and adapted by the
2022/23 Code; and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland
Act 2003. 
Basis for opinion
We conducted our audit in accordance with applicable law and International
Standards on Auditing (UK) (ISAs (UK)), as required by the Code of Audit
Practice approved by the Accounts Commission for Scotland. Our
responsibilities under those standards are further described in the auditor’s
responsibilities for the audit of the financial statements section of our report.
We were appointed by the Accounts Commission on 18 May 2022. Our period
of appointment is five years, covering 2022/23 to 2026/27.  We are
independent of the body in accordance with the ethical requirements that are
relevant to our audit of the financial statements in the UK including the
Financial Reporting Council’s Ethical Standard, and we have fulfilled our other
ethical responsibilities in accordance with these requirements. Non-audit
services prohibited by the Ethical Standard were not provided to the body. We
Item 3.
Page 7

Page 8

APPENDIX 1 
believe that the audit evidence we have obtained is sufficient and appropriate
to provide a basis for our opinion.
Conclusions relating to going concern basis of accounting
We have concluded that the use of the going concern basis of accounting in
the preparation of the financial statements is appropriate.
Based on the work we have performed, we have not identified any material
uncertainties relating to events or conditions that, individually or collectively,
may cast significant doubt on the body’s ability to continue to adopt the going
concern basis of accounting for a period of at least twelve months from when
the financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the
body’s current or future financial sustainability. However, we report on the
body’s arrangements for financial sustainability in a separate Annual Audit
Report available from the Audit Scotland website.
Risks of material misstatement
We report in our Annual Audit Report the most significant assessed risks of
material misstatement that we identified and our judgements thereon.
Responsibilities of the Interim Chief Financial Officer and Moray
Integration Joint Board for the financial statements
As explained more fully in the Statement of Responsibilities, the Interim Chief
Financial Officer is responsible for the preparation of financial statements that
give a true and fair view in accordance with the financial reporting framework,
and for such internal control as the Interim Chief Financial Officer determines is
necessary to enable the preparation of financial statements that are free from
material misstatement, whether due to fraud or error.
In preparing the financial statements, the Interim Chief Financial Officer is
responsible for assessing the body’s ability to continue as a going concern,
disclosing, as applicable, matters related to going concern and using the going
concern basis of accounting unless there is an intention to discontinue the
body’s operations.
The Moray Integration Joint Board is responsible for overseeing the financial
reporting process.
Auditor’s responsibilities for the audit of the financial statements
Our objectives are to obtain reasonable assurance about whether the financial
statements as a whole are free from material misstatement, whether due to
fraud or error, and to issue an auditor’s report that includes our opinion.
Page 8

Page 9

APPENDIX 1 
Reasonable assurance is a high level of assurance, but is not a guarantee that
an audit conducted in accordance with ISAs (UK) will always detect a material
misstatement when it exists. Misstatements can arise from fraud or error and
are considered material if, individually or in the aggregate, they could
reasonably be expected to influence the decisions of users taken on the basis
of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and
regulations. We design procedures in line with our responsibilities outlined
above to detect material misstatements in respect of irregularities, including
fraud. Procedures include:
• using our understanding of the local government sector to identify that
the Local Government (Scotland) Act 1973, The Local Authority
Accounts (Scotland) Regulations 2014, and the Local Government in
Scotland Act 2003 are significant in the context of the body;
• inquiring of the Interim Chief Financial Officer as to other laws or
regulations that may be expected to have a fundamental effect on the
operations of the body;
• inquiring of the Chief Financial Officer concerning the body’s policies
and procedures regarding compliance with the applicable legal and
regulatory framework;
• discussions among our audit team on the susceptibility of the financial
statements to material misstatement, including how fraud might occur;
and
• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance
with laws and regulations.
The extent to which our procedures are capable of detecting irregularities,
including fraud, is affected by the inherent difficulty in detecting irregularities,
the effectiveness of the body’s controls, and the nature, timing and extent of
the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than
irregularities that result from error as fraud may involve collusion, intentional
omissions, misrepresentations, or the override of internal control. The
capability of the audit to detect fraud and other irregularities depends on factors
such as the skilfulness of the perpetrator, the frequency and extent of
manipulation, the degree of collusion involved, the relative size of individual
amounts manipulated, and the seniority of those individuals involved.
Page 9

Page 10

APPENDIX 1 
A further description of the auditor’s responsibilities for the audit of the financial
statements is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of our
auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited
parts of the Remuneration Report
We have audited the parts of the Remuneration Report described as audited.
In our opinion, the audited parts of the Remuneration Report have been
properly prepared in accordance with The Local Authority Accounts (Scotland)
Regulations 2014.
Other information 
The Interim Chief Financial Officer is responsible for the other information in
the annual accounts. The other information comprises the Management
Commentary, Annual Governance Statement, Statement of Responsibilities
and the unaudited part of the Remuneration Report. 
Our responsibility is to read all the other information and, in doing so, consider
whether the other information is materially inconsistent with the financial
statements or our knowledge obtained in the course of the audit or otherwise
appears to be materially misstated. If we identify such material inconsistencies
or apparent material misstatements, we are required to determine whether this
gives rise to a material misstatement in the financial statements themselves. If,
based on the work we have performed, we conclude that there is a material
misstatement of this other information, we are required to report that fact. We
have nothing to report in this regard.
Our opinion on the financial statements does not cover the other information
and we do not express any form of assurance conclusion thereon except on
the Management Commentary and Annual Governance Statement to the
extent explicitly stated in the following opinions prescribed by the Accounts
Commission.
Opinions prescribed by the Accounts Commission on the Management
Commentary and Annual Governance Statement
In our opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with
the financial statements and that report has been prepared in
Page 10

Page 11

APPENDIX 1 
accordance with statutory guidance issued under the Local
Government in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is
consistent with the financial statements and that report has been
prepared in accordance with the Delivering Good Governance in Local
Government: Framework (2016).
Matters on which we are required to report by exception
We are required by the Accounts Commission to report to you if, in our opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration
Report are not in agreement with the accounting records; or
• we have not received all the information and explanations we require
for our audit. 
We have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to our responsibilities for the annual accounts, our conclusions on
the wider scope responsibilities specified in the Code of Audit Practice,
including those in respect of Best Value, are set out in our Annual Audit Report.
Use of our report
This report is made solely to the parties to whom it is addressed in accordance
with Part VII of the Local Government (Scotland) Act 1973 and for no other
purpose. In accordance with paragraph 108 of the Code of Audit Practice, we
do not undertake to have responsibilities to members or officers, in their
individual capacities, or to third parties. 
Angela Pieri, (for and on behalf of Grant Thornton UK LLP),
110 Queen Street
Glasgow
G1 3BX 
Date……………………………………………………………. 
Page 11

Page 12

Page 12

Page 13

Item 3.
Page 13

Page 14

Commercial in confidence
Page 14

Page 15

Commercial in confidence
•
•
•
•
Page 15

Page 16

Commercial in confidence
Page 16

Page 17

Commercial in confidence
•
•
•
Page 17

Page 18

Commercial in confidence
•
Page 18

Page 19

Commercial in confidence
•
•
•
•
•
•
•
•
Page 19

Page 20

Commercial in confidence
•
•
•
•
Page 20

Page 21

Commercial in confidence
•
•
•
•
•
•
•
−
−
Page 21

Page 22

Commercial in confidence
↔ ✓  



↔
Page 22

Page 23

Commercial in confidence
•
•
Page 23

Page 24

Commercial in confidence
•
•
•
•
•
•
Page 24

Page 25

Commercial in confidence
Page 25

Page 26

Commercial in confidence
Page 26

Page 27

Commercial in confidence
Page 27

Page 28

Commercial in confidence
•
•
Page 28

Page 29

Commercial in confidence
Page 29

Page 30

Commercial in confidence
© 2023 Grant Thornton UK LLP.




   
   
Page 30

Page 31

Page 31

Page 32

Commercial in confidence
Page 32

Page 33

Commercial in confidence
4.7 10.7
Page 33

Page 34

Commercial in confidence
Page 34

Page 35

Commercial in confidence
163,507 168,636 173,830 179,230 184,769
162,139 164,820 167,520 170,377 173,325
(1,368) (3,816) (6,310) (8,853) (11,444)
Page 35

Page 36

Commercial in confidence
Page 36

Page 37

Commercial in confidence
Page 37

Page 38

Commercial in confidence
Page 38

Page 39

Commercial in confidence
Page 39

Page 40

Commercial in confidence
Page 40

Page 41

Commercial in confidence
Page 41

Page 42

Commercial in confidence
Page 42

Page 43

Commercial in confidence
Page 43

Page 44

Commercial in confidence
Page 44

Page 45

Commercial in confidence
Page 45

Page 46

Commercial in confidence
Page 46

Page 47

Page 47

Page 48

Commercial in confidence
Page 48

Page 49

Commercial in confidence
•
•
• Page 49

Page 50

Commercial in confidence
Page 50

Page 51

Commercial in confidence



Page 51

Page 52

Commercial in confidence
Page 52

Page 53

Commercial in confidence
Page 53

Page 54

Commercial in confidence
Page 54

Page 55

Commercial in confidence
Page 55

Page 56

Commercial in confidence
Page 56

Page 57

Commercial in confidence
Page 57

Page 58

Commercial in confidence
46
Page 58

Page 59

Commercial in confidence
47
Page 59

Page 60

Commercial in confidence
48
International Standard on Auditing ISA (UK) 260, as well as other ISAs, prescribe matters which we are required to communicate with
those charged with governance. These are set out in the table below. 
Our communication plan Audit Plan
Annual Report
(our ISA 260
Report)


 
 
 










Page 60

Page 61

Page 61

Page 62

Page 62

Page 63

REPORT TO: MORAY INTEGRATION JOINT BOARD ON 26 OCTOBER 2023 
SUBJECT: 2022/23 AUDITED ANNUAL ACCOUNTS 
BY:  CHIEF FINANCIAL OFFICER 
1. REASON FOR REPORT 
1.1 To submit to the Moray Integration Joint Board (MIJB) the Audited Annual
Accounts for the year then ended 31 March 2023. 
2. RECOMMENDATION 
2.1 It is recommended that the MIJB consider and approve the Audited
Annual Accounts for the financial year 2022/23 and the letter of
Representation. 
3. BACKGROUND 
3.1     The Unaudited Annual Accounts for 2022/23 were submitted to the meeting of
the Moray Integration Joint Board (MIJB) on 29 June 2023 prior to submission
to external audit (paragraph 7 of the Minute refers). 
3.2 The Annual Accounts have been prepared in accordance with International
Financial Reporting Standards and the Local Government (Scotland) Act
1973, The Local Authority Accounts (Scotland) Regulations 2014 and the
Local Government in Scotland Act 2003. 
4 KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1     The audit undertaken by the Board’s External Auditors, Grant Thornton is now
complete.  The External Auditors have expressed unqualified opinions in
respect of the financial statements, the remuneration report, the management
commentary and the annual governance statement.  The Independent
Auditor’s Report to the Members of the MIJB and the Accounts Commission is
included within the audited Annual Accounts and can be found on page 55. 
The audited Annual Accounts are attached at APPENDIX 1. 
4.2      Attached at APPENDIX 2, is the letter of representation to the External
Auditors from the members of the MIJB, for approval by Committee to be
signed following this meeting.
Item 4.
Page 63

Page 64

4.3 The audit process highlighted changes to be made to the accounts which in
the main were presentational and in parallel with expectation following
external audit inspection. 
4.3 The Auditor’s Annual Audit Report to the MIJB and the Accounts Commission
is the subject of a separate report to this meeting.  The report sets out the
responsibilities of Grant Thornton as the independent auditor and presents a
summary of the findings arising from the 2022/23 audit.  The report confirms
there are no unadjusted misstatements in the annual accounts to report to
those charged with governance. 
4.4 The Audited Annual Accounts are presented to this meeting for consideration
and approval.  Thereafter, the Chief Officer, Interim Chief Financial Officer
and the Chair of the Board will sign the accounts prior to submission to Grant
Thornton prior to publication. 
5 SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Moray Partners in Care 2019 – 2029”
The Audited Annual Accounts have been completed within the statutory
timescales permitted under the Coronavirus (Scotland) Act 2021 and are
being presented for consideration and sign off. 
(b) Policy and Legal
The Public Bodies (Joint Working) (Scotland) Act 2014 requires that the
MIJB is subject to the audit and accounts provisions of a body under
Section 106 of the Local Government (Scotland) Act 1973.  In addition,
the Coronavirus (Scotland) Act 2021 has been adhered allowing
statutory reporting deadlines to be flexed. 
(c) Financial implications
The adjustments and revisions made to the Annual Accounts following
the external audit had no financial impact on the MIJB. 
(d) Risk Implications and Mitigation
There are no risk issues arising directly from this report.  The work
undertaken by Audit Scotland provides assurance to the Board that the
Annual Accounts for 2022/23 give a true and fair view in accordance with
applicable law and the 2022/23 Code of the state of affairs of the MIJB 
as at 31 March. 
(e) Staffing Implications
None arising directly from this report. 
(f) Property
None arising directly from this report. 
(g) Equalities/Socio Economic Impact
None arising directly from this report as there is no resultant change in
policy. 
Page 64

Page 65

(h) Climate Change and Biodiversity Impacts
There are no direct climate change and biodiversity implications as there
has been no change to policy. 
(i) Directions 
None arising directly from this report 
(j) Consultations
In preparation of the Annual Accounts, consultations have taken place
between finance staff of both Moray Council and NHS Grampian who are
in agreement within their areas of responsibility.   The Chief Officer has
been consulted and comments have been considered. 
6 CONCLUSION 
6.1 Following a completed external audit process and an unqualified
opinion being received.  The Audited Annual Accounts are presented
here for approval and formal sign off. 
Author of Report: Deborah O’Shea, Interim Chief Financial Officer
Background Papers:  With author
Ref: 
Page 65

Page 66

Page 66

Page 67

APPENDIX 1
Moray Integration Joint Board Annual Accounts 2022/23
Item 4.
Page 67

Page 68

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 
If you need information from the Moray Council in a
different language or format, such as Braille, audio tape
or large print, please contact: 
ياروم سلجم لبق نم تامولعم لىإ ةجاح ي ف متنك اذإ  نوكتو  ةغلب
وأ ويدوأ ةناوطسأ ،يا ربلا لثم فلتخم لكش لىعوأ ةفلتخم  نوكت نأ
مط ب لاصّتلإا ءاجّرلاف ةظيلغ فورح لامعتساب ةعوب 
Jei pageidaujate tarnybos Moray tarybos teikiamą informaciją gauti kitokiu
formatu, pvz., Brailio raštu, garso įrašu ar stambiu šriftu, kreipkitės: 
Jeśli potrzebują Państwo informacji od Rady Okręgu Moray w innym
formacie, takim jak alfabet Braille'a, kasety audio lub druk dużą czcionką,
prosimy o kontakt: 
Se necessitar de receber informações por parte do Concelho de Moray
num formato diferente, como Braille, cassete áudio ou letras grandes,
contacte: 
Ja Jums vajadzīga informācija no Marejas domes (Moray Council) citā
valodā vai formātā, piemēram, Braila rakstā, audio lentā vai lielā drukā,
sazinieties ar: 
ای نابز رگید یسک ےس لسنوک ےروم وک پآرگاتروص    راکرد تامولعم ںیم
لاثم ںوہ ˝    ،فورح ےڑب ای پیٹ ویڈآ ،ےلیربںیئامرف ہطبار رک امرف ینابرہم وت: 
Interim Chief Financial Officer to the Moray Integration
Joint Board, High Street, Elgin, IV30 1BX 
accountancy.support@moray.gov.uk 
Page 68

Page 69

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 
Table of Contents 
MORAY INTEGRATION JOINT BOARD MEMBERS 2022/23 .............................................. 1
MANAGEMENT COMMENTARY .......................................................................................... 2
STATEMENT OF RESPONSIBILITIES ............................................................................... 25
REMUNERATION REPORT ............................................................................................... 27
ANNUAL GOVERNANCE STATEMENT ............................................................................. 31
COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT ..................................... 43
MOVEMENT IN RESERVES STATEMENT ........................................................................ 44
BALANCE SHEET .............................................................................................................. 45
NOTES TO THE FINANCIAL STATEMENTS ..................................................................... 46
Note 1 Significant Accounting Policies ............................................................................. 46
Note 2 Critical Judgements and Estimation Uncertainty .................................................. 47
Note 3 Events after the Reporting Period ........................................................................ 48
Note 4 Expenditure and Income Analysis by Nature ........................................................ 48
Note 5 Taxation and Non-Specific Grant Income ............................................................. 49
Note 6 Debtors ................................................................................................................ 49
Note 7 Usable Reserve: General Fund ............................................................................ 50
Note 8 Agency Income and Expenditure .......................................................................... 51
Note 9 Related Party Transactions .................................................................................. 52
Note 10 VAT .................................................................................................................... 54
Note 11 Accounting Standards That Have Been Issued but Have Yet To Be Adopted .... 54
INDEPENDENT AUDITOR'S REPORT…………………………………………………………..55 
Page 69

Page 70

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 1 
MORAY INTEGRATION JOINT BOARD MEMBERS 2022/23
Voting Members      
Dennis Robertson (Chair)   The Grampian Health Board
Tracy Colyer (Vice-Chair)   Moray Council
Sandy Riddell    The Grampian Health Board
Derick Murray    The Grampian Health Board
Professor Siladitya Bhattacharya  The Grampian Health Board
Cllr. Peter Bloomfield   Moray Council
Cllr. Scott Lawrence    Moray Council 
Cllr. John Divers    Moray Council
Non-Voting Members
Simon Bokor-Ingram   Chief Officer Professional
Tracy Stephen    Chief Social Work Officer
Jane Ewen     Lead Nurse
Professor Duff Bruce   Non Primary Medical Service Lead
Dr Robert Lockhard    GP Lead
Dr Malcolm Simmons   GP Lead
Graham Hilditch    Third Sector Stakeholder
Val Thatcher     Public Partnership Forum Representative
Ivan Augustus    Carer Representative
Stuart Falconer                Grampian Health Board Staff Partnership
Kevin Todd     Moray Council Staff Representative
Elizabeth Robinson    Public Health Representative
Co-opted Members
Sean Coady     Head of Service and IJB Hosted Services
Deborah O’Shea    Interim Chief Finance Officer
Professor Caroline Hiscox   The Grampian Health Board
Roddy Burns     Moray Council 
Sonya Duncan    Corporate Manager
Page 70

Page 71

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 2 
MANAGEMENT COMMENTARY 
The Role and Remit of the Moray Integration Joint Board 
The Public Bodies (Joint Working) (Scotland) Act 2014 required that Moray Council
and the Grampian Health Board prepared an Integration Scheme for the area of the
local authority detailing the governance arrangements for the integration of health and
social care services.  This legislation resulted in the establishment of the Moray
Integration Joint Board (MIJB) that became operational from 1 April 2016.  Moray
Council and Grampian Health Board, as the parties to the Integration Scheme, each
nominate voting members to the MIJB, currently, four elected members from Moray
Council and four Grampian Health Board members.   
Under the Public Bodies (Joint Working) (Scotland) Act 2014, a range of health and
social care functions have been delegated from Moray Council and Grampian Health
Board to the MIJB who has assumed responsibility for the planning and operational
oversight of delivery of integrated services.  MIJB also has a role to play in the strategic
planning of unscheduled acute hospital based services provided by Grampian Health
Board as part of the ‘set aside’ arrangements. 
Hosted services also form part of the MIJB budget.  There are a number of services
which are hosted by one of the 3 IJB’s within the Grampian Health Board area on
behalf of all the IJBs.  Responsibilities include the planning and operational oversight
of delivery of services managed by one IJB on a day to day basis.  MIJB has
responsibility for hosting services relating to Primary Care Contracts and the Grampian
Medical Emergency Department (GMED) Out of Hours service. 
Key Purpose and Strategy 
Following review and consultation, the refreshed Strategic Plan (2022-2032) is a
continuation of the 2019 Strategic Plan.  The current plan emphasises the strength of
integration and in addition to our two main Partners – Moray Council and the Grampian
Health Board - the MIJB recognises the importance of the Third and Independent
Sectors in facilitating the successful operation of the partnership of Health & Social
Care Moray. As with all health and social care systems Moray is facing increasing
demand for services at the same time as resources – both funding and workforce
availability - are under pressure. These challenges will intensify in the coming years
as our population ages and more people with increasing complex needs require
support to meet their health and care needs.  The MIJB sets the direction and strategic
intent through the development and implementation of the Strategic Plan and seeks
assurance on the management and delivery of services through Board level
performance reporting which ensures an appropriate level of scrutiny and challenge. 
The Strategic Plan identifies priority areas to support strategic direction and vision.   
Page 71

Page 72

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 3 
MANAGEMENT COMMENTARY (continued) 
STRATEGIC PLAN KEY THEMES 
The Plan purposefully places an emphasis on prevention and early intervention
activities and seeks to prioritise these activities as a long term goal, actively pursuing
good health and wellbeing for the population, this will mean hair  in this area of work. 
It highlights the Home First approach and the rationale for this is to assist people in
understanding that “hospital is not always the best place for people”, a statement
frequently used and in particular if you are frail and elderly can be counter intuitive to
a successful recovery.  The response to Covid 19 has escalated elements of the Home
First approach.   
Through 2022/23 the recovery from the pandemic has continued to drive a level of
transformational change. This pace will need to continue in the next year and beyond
as we face significant levels of demand. Our Strategic Plan was refreshed in 2022/23
and a delivery plan is now being produced to reflect the recovery phase that will be
needed to deal with day to day demand and a backlog that has accumulated. 
BUILDING RESILIENCE – Taking greater responsibility for our health and
wellbeing
HOME FIRST – Being supported at home or in a homely setting as far as
possible
PARTNERS IN CARE – Supporting citizens to make choices and take
control of their care and support
WE ARE PARTNERS IN CARE
OUR VISION: “We come
together as equal and valued
partners in care to achieve the
best health and wellbeing
possible for everyone in Moray
throughout their lives.”
OUR VALUES: Dignity and
respect; person-led; care and
compassion; safe, effective and
responsive
OUTCOMES: Lives are healthier – People live more independently –
Experiences of services are positive – Quality of life is improved – Health
inequalities are reduced – Carers are supported – People are safe – The
workforce continually improves – Resources are used effectively and
efficiently
Page 72

Page 73

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 4 
MANAGEMENT COMMENTARY (continued) 
Population 
Moray is a largely rural area covering a land mass of 2,238 sq. km.  It has a long
coastline on the Moray Firth with harbours, fishing villages and world-class
beaches.  The area’s projected population for 2023 is 95,749.  The main centre of
population is Elgin, which is home to more than one quarter of the people living in
Moray.  Other towns of population between 5,000 and 10,000 are Forres, Buckie,
Lossiemouth and Keith.  Moray’s population has grown significantly in recent years
from 87,160 in 1997.  The population growth in Moray is slowing and it is projected
that against the 2018 baseline1 Moray will be one of the 14 councils in Scotland who
will have had a population decline by 2030.  This trend is forecast to continue. 
The table below sets out projected population growth based on the 2018 baseline.
Across Scotland there is a projected reduction in children, limited change in the
working age population, but significant growth in adults of pensionable age. By
comparison it is projected that Moray will have a greater decrease in children, a
marked decrease in those of a working age, but a significantly higher change in those
of a pensionable age. 
1 https://www.nrscotland.gov.uk/files//statistics/nrs-visual/sub-nat-pop-proj-18/pop-proj-principal-2018-
infographic.pdf
Page 73

Page 74

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 5 
MANAGEMENT COMMENTARY (continued) 
Performance Reporting 
Performance is reported quarterly to the Audit, Performance and Risk Committee of
the MIJB.  In addition to the quarterly reporting, there is a requirement under the Public
Sector (Joint Working) (Scotland) Act 2014 for the MIJB to produce and publish an
Annual Performance Report setting out an assessment of performance in planning
and carrying out the delegated functions for which they are responsible.  The Annual
Performance Report is due to be published by 31 July this year and will be published
on the Health & Social Care Moray website.   
One of the major aims of integration and a key measurable target for MIJB is to reduce
the number of Moray residents that are ready to be sent home from hospital but have
been delayed in this process.  This is referred to as a ‘delayed discharge’.  Delayed
discharge can occur due to several reasons but quite often involves the onward
provision of social care which can be complex in nature.  The table below notes
performance over a six year period showing the number of delayed discharge bed
days occupied varying significantly and with minimal seasonal pattern up to March
2023. 
There was a significant reduction in delayed discharges in April to June 2020 onwards
as the focus of the Covid 19 response in Moray was assessing and finding suitable
support for those in hospital (specifically those ready for discharge) to allow for the
anticipated influx of Covid 19 patients. 
Whole system Moray Portfolio meetings, which occur daily, have been taking place
with operational staff from all services to ensure system wide awareness of the
pressures that might cause issues with patient flow. The meeting begins with an
overview of the current status of all services and then provides a platform to support
staff with problems that might interrupt flow. It is also an opportunity to deploy available
resource to the most critical areas. This has resulted in improved communication,
quicker placement and improved flow. In addition to this more care home beds have
been made available due to an agreement to pay from offer of care home bed to
ensure beds are free on discharge date.  
This reduction is also in part due to the new classification of delays to discharge in
the NHS system introduced across Scotland in February 2023. The new Planned
Discharge Date (PDD) system changed the criterion from ‘medically fit’ to ‘clinically
fit’. When we declare a person is clinically fit it allows time for occupational therapy,
physio-therapy and social work to carry out their assessments before the person is
categorised as a delay, and this measure has reduced delays slightly. While this has
resulted in longer stays prior to an agreed discharge date it has aligned Moray
practice with the rest of Scotland
Additionally, the Hospital Discharge Team continues to scrutinise all delays daily and
ensure they are still relevant, more people have been recruited into the Care at 
Page 74

Page 75

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 6 
MANAGEMENT COMMENTARY (continued) 
Home team enabling more rotas to be opened and there are fewer people requiring
double-up care than in recent months
Th
The Number of Bed Days Occupied by Delayed Discharges 18+ per 1,000 population
Jun 22 Sept 22 Dec 22 Mar 23
1,207 1,197 1,063 751
Jun 21 Sept 21 Dec 21 Mar 22
592 784 1,142 1,294
Jun 20 Sept 20 Dec 20 Mar 21
242 803 672 496
Jun 19 Sept 19 Dec 19 Mar 20
768 751 971 1,208
Jun 18 Sept 18 Dec 18 Mar 19
1,008 1,276 1,070 926
Jun 17 Sept 17 Dec 17 Mar 18
1,161 749 823 1,089
e Nu of Bed Days Occupied by Delayed Discharges (inc code 9) 18+ per 1,000 po 
In relation to Emergency occupied bed days, there continues to be a focus on ensuring
people are getting home quickly and can maintain their independence.  This had
resulted in a long-term downward trend in the rate of emergency occupied bed days
for over 65’s per 1,000 population from June 2017 to March 2021. However, since Mar
21 there has been a consistent quarter on quarter increase in the rate resulting in a
51% increase as of March 2023. 
This reflects the system still under pressure despite the gains made in other measures.
The numbers of admissions has not increased along with this and would suggest
people are spending more time in hospital impacting this figure. A number of surge
beds (ability to house and treat patients above the normal safely staffed bed
occupancy when facing extreme pressure) being made available in Moray have
contributed to this increase due to increased capacity. 
Moray’s aging population will also be a factor in this increase as patients over 65 are
disproportionately likely to spend time in hospital after the point at which they are ‘fit’
to be transferred or discharged from an acute care setting. This primarily due to the
historical lack of capacity in community settings to meet patient needs. Some of the
‘excess’ is also likely to be attributed to access to diagnostics or acute interventions
that are not available at Dr Gray’s. For example, Dr Gray’s in-patients routinely wait
longer for cardiac angiography than similar cohorts of patients who are initially
admitted to ARI. This is only delivered in ARI and Dr Gray’s patients need to be
allocated a bed in ARI before transfer for the diagnostic. 
It is hoped that with the reduction in delayed discharges this figure will decrease in the
coming months. As it is a rolling 12 month figure it will therefore have a lag in any
improvements made in the system. 
Page 75

Page 76

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 7 
MANAGEMENT COMMENTARY (continued) 
Rate of Emergency Occupied Bed Days for over 65’s per 1000 Population
Jun 22 Sept 22 Dec 22 Mar 23
2,320 2,469 2,547 2,749
Jun 21 Sept 21 Dec 21 Mar 22
1,859 1,934 2,045 2,140
Jun 20 Sept 20 Dec 20 Mar 21
2,087 2,040 1,840 1,780
Jun 19 Sept 19 Dec 19 Mar 20
2,117 2,097 2,112 2,173
Jun 18 Sept 18 Dec 18 Mar 19
2,380 2,375 2,344 2,274
Jun 17 Sept 17 Dec 17 Mar 18
2,558 2,531 2,495 2,444 
Covid 19 Pandemic Recovery Continues 
During 2022-23 Moray Health and Social Care Partnership (HSCM) remained in a
pandemic recovery phase, flexing and stepping up quickly to respond to spikes in
Covid 19 infection rates. It was clear it would not be possible in all cases to restore
services to pre-pandemic levels as long as enhanced public health measures
remained in place. It was further evident that what could be delivered from within
existing resources (workforce, infrastructure, and finance) was diminished. Even at
this level, the requirement to operate core services alongside the additional
measures in place to support the pandemic response meant there was an immediate
and ongoing resource impact. 
The health and social care system was challenged by some significant periods of
demand. A pan-Grampian approach was taken in how surge and flow through the
system was managed to ensure people in the community and in hospital received
the care they required.
Moray Integration Joint Board (MIJB) 
MIJB continues to oversee the delivery of services in line with the Integration
Scheme and Strategic Plan. Service have begun to recover from the many
challenges created by the coronavirus (Covid 19) pandemic. Service models and
methods of delivery have continued to flex and adapt rapidly during this period of
transition whilst working with a finite budget allocation. Some services continued to
adapt their delivery methods but some continue to face challenges as they continue
to implement new ways of working and engaging with our citizens. Services also
continue to face the challenges with recruitment to the area and increased staff
absences. 
Page 76

Page 77

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 8 
MANAGEMENT COMMENTARY (continued) 
Performance
The MIJB, its committees and Senior Management Team receive regular assurance
reports and updates on how the Strategic Plan commitments are being progressed
through work streams and individual service plans, as well as detailed financial and
performance updates. 
The strategic risk register is also reviewed regularly by the Senior Management
Team as part of a robust risk monitoring framework in order to identify, assess and
prioritise risks related to the delivery of services, particularly any which are likely to
affect the delivery of the Strategic Plan. 
The inherent risks being faced by the Moray MIJB, together with a current
assessment on the level of the risks and mitigating actions being taken to reduce the
impact of the risks, is reported to each meeting of the Audit Performance and Risk
Committee for oversight and assurance. 
Management teams and the Care and Clinical Governance Group review and
respond to any reports produced by Audit Scotland, Healthcare Improvement
Scotland, the Care Inspectorate, and the Mental Welfare Commission for Scotland
and the Ministerial Strategic Group for Health and Care. 
Page 77

Page 78

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 9 
MANAGEMENT COMMENTARY (continued) 
Strategy and Plans
The MIJB is required to review their Strategic Plan every three years as per the
legislation. The Strategic Plan 2019-2029 was widely consulted to create an
ambitious 10-year Plan for Moray.  It was recognised that the health and social care
landscape has changed but the 2019 Plan purposefully placed an emphasis on
prevention and early intervention with the aim of building resilience for individuals
and communities. The Plan identified key aims of the MIJB and directed HSCM to
work closely with communities and key partners to reform the system of health and
social care in Moray. It was also recognised that progress has been made against
the three strategic themes and the review of the Plan focused on what already has
been achieved. Therefore, the MIJB Strategic Plan 2022-2032 is a continuation of
the 2019 Plan and the long-term strategic objectives make room for adapting to
challenges and developments in health and social care over the coming years. 
The current Strategic Plan  sets out the following vision and priorities for health and
social care services in Moray.    
Health and Social Care Moray’s strategic plan sets out the 3 key themes and the
objectives; 
• Building Resilience – supporting people to take
greater responsibility for their health and wellbeing
• Home First; supporting people at home or in a
homely setting as far as possible. 
• Partners in Care – supporting citizens to make
choices and take control of their care and support. 
Longer Term Impact of Covid 19 and Staff Wellbeing 
There remains real concern that after such a sustained period of additional pressure
on staff that their own resilience has been badly hit. This is reflected in the increased
staff absence figures in both health and social care staff. NHS Grampian and Moray
Council recognise the need to support staff and in order to find the reserves required
to continue to respond to the ongoing and future challenges.  There has also been a
rise in the number of staff choosing to either leave the service or take early
retirement. 
Promoting Health and Wellbeing 
The We Care staff health and wellbeing programme aims to deliver, co-ordinate and
enhance staff wellbeing across NHS Grampian and the Health and Social Care
Partnerships. The website has a hub where people can access information, help and
advice related to their own and or their team’s physical and mental wellbeing.
The Health Improvement Team leads on a number of staff wellbeing initiatives, such
as healthy weight, mental health and smoking cessation. They also provide onsite
and outreach sessions to staff teams on request.
Page 78

Page 79

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 10 
MANAGEMENT COMMENTARY (continued) 
Moray Council became a Living Wage Accredited employer in September 2022.
Additionally, the council holds the Armed Forces Covenant Silver award and are
awaiting the outcome of their gold award application.  Additionally, to support the age
profile and in line with good practice, a Menopause Policy was introduced in April
2023. 
Recovery and Re-mobilisation
Hybrid working 
The pandemic required HSCM to rapidly embrace new ways of working. This
resulted in some staff suddenly working from home on a full-time basis. HSCM faced
a huge challenge to ensure all staff had the appropriate equipment to allow this to
happen, whilst still supporting staff remotely. A huge benefit from this is the progress
we have made in digital technology and skills in a very short time. However, staff can
feel isolated and less supported
working from home, so we are now
concentrating on how we work
towards a true hybrid model, where
appropriate. 
Moray Council updated their Flexible
Working policy in 2022 to reflect the
new ways of working and promotes
a high number of flexible working
options to help employees balance their work life commitments which supports
health and wellbeing 
Service Delivery/Business as Usual
Locality planning resumed with intelligence gathering to build locality profiles.
Locality managers continue to develop approaches to community engagement to
identify local health and wellbeing priorities for improvement.
Locality engagement work continues in the Lossiemouth area to consider future
health and wellbeing provision and the impact on patients of the continued closure of
the GP branch surgery buildings in Hopeman and Burghead.
Vaccination Programme 
The Vaccination team continue to work hard to ensure the safe and effective delivery
of the Vaccination Transformation Programme across Moray. The Spring Booster
campaign commenced in March 2023 with a good update across Care Home
residents and with the lowered age of 75+ from 80+, increased outreach clinics have
been implemented across Moray, delivering vaccines closer to the communities
resulting in positive feedback. Pre School-Vaccination data shows Moray update is
above the Grampian rates.
Page 79

Page 80

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 11 
MANAGEMENT COMMENTARY (continued) 
The Health Improvement Team continue to work with our partners to support the
citizens of Moray to look after their own wellbeing. This includes the information
sharing platform on the Facebook page, together with sessions such as hands-on
cookery sessions, promoting healthy eating, particularly in low-income communities
with vulnerable groups.  
Baby Steps is a multi-agency, midwife led, interactive programme run in Moray. The
sessions provide women with the knowledge and skills to improve their Health and
Wellbeing. Baby Steps actively supports women to take small steps towards a
healthier pregnancy. The programme has supported 14 women since restarting in
July 2022.
Care homes in Moray were given the opportunity for supporting services to visit their
sites, using the Mobile Information Bus (MIB) to show-case the range of services
available locally and nationally that staff can access to enable themselves to support
their health and wellbeing. Each session was positively evaluated and interest has
now been expressed from other care homes across Moray.
At Maryhill surgery there is a new Mental Health and Wellbeing Practitioner. The
service has been used to work with individuals suffering with a number of mental
health issues, from mood depression, addiction to chronic health conditions. The aim
is to use a range of interventions such as reflective listening, mindfulness and
teaching coping skills to empower people to meet their needs. Referrals can be
made from a range of people and if a referral is not suited to this service contact will
still be made with the patient to connect them with a suitable resource.
The Learning Disability Service had plans to develop two housing projects. However,
due to the increased costs post pandemic, these did not progress as planned. Work
is ongoing to try and identify a feasible plan to continue with the project. This
remains an important element of service transformation and will allow people to be
returned to Moray as per the recent ‘Coming Home’ report guidance.
A Social Prescribing test of change is ongoing within the Forres Locality at Forres
Health Centre, supported by the Prevention and Self-Management working group. A
process is in place which enables all health and social care practitioners to signpost
patients to local community supports. Health point, Citizens Advice Bureau, Mental
Health & Wellbeing Practitioner and the Listening Service are the main referral
services for the test of change, signposting individuals on to local opportunities. A
total of 424 referrals have been made to a broad range of community programmes. 
The Resettlement and Refugee Team have provided support to a total of 133 people
(84 adults and 49 children) from Ukraine across Moray. The families were helped to
integrate into their communities and also supported into education and employment,
with 58% currently employed or in college education. 
Page 80

Page 81

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 12 
MANAGEMENT COMMENTARY (continued) 
Longer Term Changes to Strategies and Plans
Transformation
HSCM continue to progress the Home First approach to supporting people to avoid
unnecessary hospital admission and to return home, wherever possible, without
delay. This work continues to follow an ambitious model of care, involving all aspects
of Home First alongside unscheduled care, primary/secondary care and acute
services. 
The Discharge to Assess (D2A) programme is one of several initiatives that was
developed within the Operation Home First
Programme. The programme aims are: - 
• To maintain people safely at home
• To avoid unnecessary hospital attendance
or admission
• To support early discharge back home
after essential specialist care
D2A aims to impact on the following:
• Avoiding unnecessary admission 
• Reducing length of hospital stay 
• Lowering re-admission rates
• Reducing the requirement for care
packages
Whilst the driver for this change in practice was embedded in improved patient care
and patient outcomes, there was a clear financial benefit. The average length of
treatment once discharged home with support from the D2A team was 11 days,
calculating into a cost per day, per patient of £169, compared with £262-570 a day
for a hospital bed. This showed an increase in early supported discharge from
hospital to D2A, resulting in improved flow and capacity of the hospitals. Data also
shows that over 50% discharged to the D2A team are also less likely to be
readmitted at 7 and 28 days.
The success of the D2A programme will likely bring unintended challenges, in that
the increase in acuity of the patients being referred, often requiring more input and
are slightly more likely to require care now than during the pilot. This is due to the
increased complexity and multimorbidities of the patients we are now seeing post
pandemic. 
Page 81

Page 82

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 13 
MANAGEMENT COMMENTARY (continued) 
Self-Directed Support (SDS)
The most commonly assessed need in Moray is for Personal Care, it represents 88%
of support required (2021/22).The Self-Directed Support (SDS) team within HSCM
currently support 288 individuals who are in receipt of a Direct Payment (Option 1) to
meet their care and support needs.  The majority of those in receipt of a Direct
Payment opt to use their budget to employ their own team of carers (Personal
Assistants).  Currently there are approximately 380 Personal Assistants (PA’s)
working in Moray.  In order for the PA profession to be more visible, work is
underway at a national level through a PA Programme Board.
Carers Strategy
Health and Social Care Moray recognise the vital support unpaid carers provide to
the person they care for.  It is vital that unpaid carers have a life outside of their
caring role and are supported to carry on caring as long as they wish to do so.  In
recognition of his Health and Social Care Moray has recently published the new local
Moray Carers Strategy, Recognised, Valued and Supported following engagement
with unpaid carers.  A local implementation plan has recently been developed to
deliver on the key themes and objectives of the strategy.
Looking to the future
The Scottish Government continues to work towards a National Care Service for
Scotland following the recommendation of the Independent Review of adult social
care. The National Care Service would operate as a new body to oversee social
care, similar to how the National Health Service oversees health, enabling social
care to have a more equal footing with health care. It proposes that Local Integration
Authorities would have more powers and would be directly funded by national
government, rather than receiving their funding from local authorities and Health
Boards as they do currently
The Scottish Government has now agreed the delegation of Moray Children’s Social
Work and Criminal Justice to MIJB. This will be reported on in 2023/24.  
Page 82

Page 83

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 14 
MANAGEMENT COMMENTARY (continued) 
Financial Review and Performance 
Financial performance forms part of the regular reporting cycle to the MIJB. 
Throughout the year the Board, through the reports it receives is asked to consider the
financial position at a given point and any management action deemed as necessary
to ensure delivery of services within the designated financial framework.  From the
mid-point in the financial year, the Board was presented with financial information that
included a forecast position to the end of the year. In November 2022 the Board
received a financial report which forecast an expected underspend to the end of the
financial year of £3.2m.  This forecast reduced throughout the remainder of the year
and in December 2022, MIJB were forecasting an underspend to the end of the year
of £4.6m, the MIJB actually outturned at £4.7m underspent. In March 2022, the MIJB
agreed a savings plan of £0.110m.  At the end of the financial year, this had been fully
achieved.  . 
Given the uncertainties associated with Covid 19 and additional funding, it was
necessary to update the Board regularly on the emerging financial position.  This was
done formally through MIJB meetings and informally through development sessions. 
To support the response to Covid 19, the Scottish Government continued with the
process put in place last year to assess the impact of Covid 19 on Integration
Authorities’ budgets.  They did this through the local mobilisation plans for each health
board area, which in turn captured each Integration Authority.  The objective was to
demonstrate the impact on IJB budgets and provide appropriate financial support.  The
local mobilisation plans were updated regularly throughout the year and funding claw
back was made by the Scottish Government on the basis of these updates.  At the
end of the financial year, the cost of the mobilisation plan for Moray was £1.6m. The
largest element of spend was £0.664m which was used to support sustainability
payments to external providers of care.  All unspent funds were returned to the Scottish
Government via a negative allocation to NHS Grampian as at 31 March 2023   
Additional detail on the areas of spend supported through Covid 19 funding is
highlighted in the table below: 
Description Spend to 31 March 2023 
£000’s
Additional Staffing Costs 628
Provider Sustainability Payments 664
Remobilisation 119
Cleaning, materials & PPE 7
Elgin Community Hub  181
Total 1,599   
Page 83

Page 84

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 15 
MANAGEMENT COMMENTARY (continued) 
Service Area Budget
£000’s
Actual
£000’s
Variance
(Over)/ under
spend £000’s
Note
Community Hospitals & Services 5,743 5,990 (247) 
Community Nursing104,360 5,626 5,163 463 
Learning Disabilities 9,149 12,626 (3,477) 1
Mental Health 10,076 10,295 (219) 
Addictions 1,611 1,588 23 
Adult Protection & Health Improvement 164 167 (3) 
Care Services Provided In-House 21,193 18,486 2,707 2
Older People Services & Physical &
Sensory Disability 20,467 23,441 (2,974) 3
Intermediate Care & OT 1,609 1,768 (159) 
Care Services Provided by External
Contractors 8,882 8,084 798 4
Other Community Services 9,241 9,208 33 
Administration & Management 2,786 2,425 361 
Other Operational Services 1,355 1,286 69 
Primary Care Prescribing 17,322 19,283 (1,961) 5
Primary Care Services 19,048 19,058 (10) 
Hosted Services 4,844 5,018 (174) 
Out of Area Placements 669 1,232 (562) 6
Improvement Grants 940 888 52 
Total Core Services 140,725 146,006 (5,280) 
Strategic Funds & Other Resources 18,822 8,858 9,963 
TOTALS (before set aside) 159,547 154,864 4,683 
Set Aside 13,917 13,917 - 
TOTAL 173,464 168,781 4,683 
The table above summarises the financial performance of the MIJB by comparing
budget against actual performance for the year  
Page 84

Page 85

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 16 
MANAGEMENT COMMENTARY (continued) 
Significant variances against the budget were notably: 
Note 1 Learning Disabilities – The Learning Disability (LD) service was overspent
by £3.5m at the end of 2022/23. This consists of a £3.6m overspend, primarily relating
to the purchase of care for people with complex needs, staff transport and less income
received than expected.  Adults with learning disabilities are some of the most
vulnerable people in our community and need a high level of support to live full and
active lives.  The overspend was offset in part by an underspend of £0.1m, relating
primarily to staffing in speech and language and psychology services.  The
transformational change programme in learning disabilities helps to ensure that every
opportunity for progressing people’s potential for independence is taken, and every
support plan involves intense scrutiny which in turn ensures expenditure is appropriate
to meeting individual outcomes. In the last year we have seen an increase in demand
and an increase in the level of cases requiring exceptionally high amounts of care. 
Note 2 Care Services Provided In-House – This budget was underspent by £2.7m
at the end of the year. The most significant variances relate to the Care at Home
services for all client groups which are underspent predominantly due to vacancies
and issues with recruitment and retention. This is reduced by overspends in internal
day services mainly due to transport costs and less income received than expected. 
Note 3 Older People Services and Physical & Sensory Disability - This budget
was overspent by £3m at the end of the year. The final position includes an overspend
for domiciliary care in the area teams, which incorporates the Hanover complexes for
very sheltered housing in Forres and Elgin and for permanent care due to more clients
receiving nursing care than residential care. The ageing population requiring more
complex care and local demographics also contributes to this overspend as well as
the correlation between the recruitment and retention of the internal home care service
provision. 
Note 4 Care Services provided by External Contractors – This budget was
underspent by £0.8m at the end of the year. This predominantly relates to
underspends on contracts for Mental Health and Learning Disabilities as contracts
have ended and alternative services procured. 
Note 5 Primary Care Prescribing - This budget was overspent by £2m. The actual
data to March indicates that the average item price has increased significantly since
June 2022, this has been attributed in part to the continuing impact of short supply
causing an increase in prices and general inflationary cost increase. Medicines
management practices continue to be applied on an ongoing basis to mitigate the
impact of external factors as far as possible and to improve efficiency of prescribing
both from clinical and financial perspectives. 
Note 6 Out of Area Placements – This budget was overspent by £0.56m at the end
of the year. This relates to an increase in patients requiring high cost individual
placements. 
Page 85

Page 86

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 17 
MANAGEMENT COMMENTARY (continued) 
MIJB’s financial performance is presented in the comprehensive income and
expenditure statement (CIES), which can be seen on page 43.  At 31 March 2023
there were usable reserves of £4.683m available to the MIJB, compared to £17.02m
at 31 March 2022.  These remaining reserves of £4.683m are for various purposes as
described below: 
Earmarked Reserves Amount £000’s
Primary Care Improvement Plan & Action 15 937
GP Premises 229
Community Living Change Fund 319
National Drugs MAT 61
National Drugs Mission Moray 186
OOH Winter Pressure funding 182
Moray Cervical screening 36
Moray hospital at home 50
Moray interface discharge 139
Moray Psychological 279
MHO Funding 69
Care at Home Investment funding 720
Interim Care Funding 216
Moray Workforce well being 26
Adult Disability payment 45
National Trauma Training services 50
Social Work Capacity in Adult Services 145
Additional investment in H&SC 591
Moray Winter Fund HCSW & MDT 323
LD Annual Health Checks 35
Realistic Medicine 40
Community Planning partnership 5
Total Earmarked 4,683  
General Reserves 0  
TOTAL Earmarked & General  4,683
Page 86

Page 87

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 18 
MANAGEMENT COMMENTARY (continued) 
Action 15 – as part of the Mental Health Strategy 2017-2027, Scottish Government
Ministers made a commitment to provide funding to support employment of 800
additional mental health workers to improve access. 
Primary Care Improvement Plan – Scottish Government investment to support the GP
contract that was agreed in 2018.  Covers 6 priority areas identified by Government. 
GP Premises – balance of funding for improvement grants including the making of
premises improvement grants to GP contractors. The continued digitalisation of paper
GP records. Modifications for the purposes of improving ventilation and increase to
the space available in NHS owned or leased premises for primary care multi-
disciplinary teams. 
Community Living Change Fund – funding to be used over a three year period (2021-
2024) to support reducing delayed discharge of those with complex needs, repatriate
people inappropriately placed outside Scotland and to redesign the way service are
provided for people with complex needs. 
National Drugs Medication Assisted Treatment (MAT) for embedding and
implementation of the standards will he be overseen by the MAT implementation
support team (MIST). 
National Drugs Mission Moray – balance of funding for range of activities including:
drug deaths, taskforce funding, priorities of national mission, residential rehabilitation,
whole family approach, outreach, bear fatal overdose pathways and lived and living
experience. 
Out of Hours Winter Pressure funding – balance of funding to sustain GO out of hours
and to support resilience to explore operational solutions. 
Moray Cervical Screening – balance of funding for smear test catch up campaign. 
Moray Hospital at home – development of Hospital at Home provides Acute hospital
level care delivered by healthcare professionals, in a home context for a condition that
would otherwise require acute hospital inpatient care. 
Moray Interface Care & Discharge without Delay (DWD) - interface care programme
is part of the urgent and unscheduled care programme. DWD programme is to prevent
delay and reduce length of stay. 
Moray Psychological – funding streams for mental health, psychological wellbeing,
facilities, post diagnostic support and psychological therapies. 
Mental Health Officer (MHO) funding – funding to support additional mental health
officer capacity. 
Care at Home investment funding – balance of funding to build capacity in care at
home community based services.
Page 87

Page 88

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 19 
MANAGEMENT COMMENTARY (continued) 
Interim Care funding – balance of non-recurring funding basis to enable patients
currently in hospital to move into care homes and other community settings. 
Moray Workforce Wellbeing – funding to the health and wellbeing of those working in
health and social care. 
Adult Disability payment – funding to assist with the implementation of the adult
disability payments. 
National Trauma Training services – training for dealing with people affected by
trauma and adversity. 
Social Work Capacity in Adult Services – support measures that general additional
adult social care workforce. 
Additional investment in H&SC – to be invested in front line health and social care. 
Moray Winter Fund Health Care Social Workers (HCSW) – additional funding for
further HCSW in both the IJB and Emergency department. 
Moray Winter fund Multi Disciplinary Team – additional funding for service pressures
includes Discharge to Assess, Home First Frailty team and volunteer development.  
Learning Disability Annual Health Checks – to implement the annual health checks. 
Realistic Medicine – investment in the realistic medicine based approach. 
Community Planning Partnership – funding towards community planning partnership . 
All reserves are expected to be utilised for their intended purpose during 2023/24. 
Set Aside – Excluded from the financial performance table above on page 15 but
included within the Comprehensive Income & Expenditure Account is £13.92m for Set
Aside services.  Set Aside is an amount representing resource consumption for large
hospital services that are managed on a day to day basis by the NHS Grampian.  MIJB
has a responsibility for the strategic planning of these services in partnership with the
Acute Sector.
Set Aside services include:
• Accident and emergency services at Aberdeen Royal Infirmary and Dr Gray’s
inpatient and outpatient departments;
• Inpatient hospital services relating to general medicine, geriatric medicine,
rehabilitation medicine, respiratory medicine, learning disabilities, old age
psychiatry and general psychiatry; and
• Palliative care services provided at Roxburgh House Aberdeen and The Oaks
Elgin. 
Page 88

Page 89

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 20 
MANAGEMENT COMMENTARY (continued) 
The budget allocated to Moray is designed to represent the consumption of these
services by the Moray population. As a result of prioritising resources to support the
Covid 19 pandemic Public Health Scotland have not produced activity data for Set
Aside services since 2019/20 financial year.   
The figures for 2022/23 have been derived by uplifting 2019/20 figures by baseline
funding uplift in 2020/21 (3.00%), 2021/22 (3.36%) and 2022/23 (6.70%): 
2022/23 2021/22 2020/21 2019/20
Budget 13.92m 13.04m 12.62m 12.252m 
Risks, Uncertainties and Future Developments
The MIJB Chief Officer has a responsibility to maintain a risk strategy and risk reporting
framework.  Risks inherent within the MIJB are monitored, managed and reported at
each meeting of the Audit, Performance and Risk Committee.  In addition, a risk action
log is monitored and managed by the Senior Management Team.   
The key strategic risks of the MIJB classed as ‘High’ and ‘Very High’ are presented
below: 
VERY HIGH
Risk 2 - There is a risk of MIJB financial failure in that the demand for services
outstrips available financial resources.  Financial pressures being experienced both
by the funding Partners and Community Planning Partners will directly impact on
decision making and prioritisation of MIJB. 
Mitigating Actions - Risk remains of the challenge that the MIJB can deliver
transformation and efficiencies at the pace required whilst dealing with the emerging
financial pressures.  Financial information is reported regularly to both the MIJB,
Senior Management Team and System Leadership Group. 
The Chief Officer and Interim Chief Financial Officer (CFO) continue to engage in
finance discussions with key personnel of both NHS Grampian and Moray Council.   
The Chief Officer and Interim CFO will continue to engage with the partner
organisations in respect of the financial position throughout the year. Cross
partnership performance meetings are in place with partner CEOs, Finance
Directors and the Chair/Vice Chair of the MIJB. 
The CFO and Senior Management Team continue to work together to address
further savings which will be presented to the Board for approval during 2023/24. 
This should be a focus of continuous review to ensure any investment is made taking
cognisance of existing budget pressures. 
Page 89

Page 90

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 21 
MANAGEMENT COMMENTARY (continued) 
HIGH 
Risk 3 - Inability to recruit and retain qualified and experience staff to provide and
maintain sustainable, safe care, whilst ensuring staff are fully able to manage
change resulting from response to external factors such as the impact of Covid 19
and the actions that arose from the recommendations from the Independent Review
of Adult Social Care 2021. 
Mitigating Actions - System re-design and transformation.   
Organisational Development Plan and Workforce plan were updated and approved
by MIJB in November 2019 The updated Workforce plan has been submitted to
Scottish Government and comments were received by the HSCP in October 2022.   
Staff Wellbeing is a key focus and there are many initiatives being made available
to all staff including training, support, information and access to activities. 
Locality Managers are developing the Multi-disciplinary teams in their areas and
some project officer support has been provided to develop the locality planning
model across Moray. 
Lead Managers are involved in regional and national initiatives to ensure all learning
is adopted to improve this position.  . 
Lead Managers and Professional Leads are linked to University Planning for intakes
and programmes for future workforce development. 
Risk  5 - Inability to cope with unforeseen external emergencies or incidents as a
result of inadequate emergency and resilience planning. 
Mitigating Actions – Information from the updated Business Impact Assessments
/Business Continuity Plans has informed elements of the Winter Preparedness Plan. 
A Friday huddle continues, this allows the status of services across the whole
system to provide information and contact details to the Senior Manager on Call
(SMOC) over the weekend. If any potential issues are highlighted the relevant
Persons at Risk Data is compiled and if appropriate, shared with relevant personnel. 
NHS Grampian have introduced system wide daily huddles to manage the flow and
allocation of resources which require attendance from Dr Grays and HSCM. 
Practitioner group established for Moray with representation from HSCM, Dr Grays,
Moray Council and NHS Grampian to discuss matters arising from the Local
Resilience Forum and within our respective organisations.  In addition it will provide
a forum for discussion of the linkages between organisational response plans to
ensure there are no gaps or over reliance on particular local resources. 
Page 90

Page 91

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 22 
MANAGEMENT COMMENTARY (continued) 
HIGH (continued) 
HSCM continues to monitor the local situation regarding impacts on staffing and is
engaged with NHSG emergency planning arrangements and Council Response
and Recovery management team to be ready to escalate response if required.
Work was undertaken within NHSG, Aberdeenshire HSCP and Aberdeen City
HSCP to look at Surge flows and establish a mechanism that will provide easy
identification of “hot spots” across the whole system in Grampian, to facilitate a
collaborative approach to addressing the issues through the use of a common
Operational Pressure Escalation approach.  This work could underpin surge
responses in winter and at other times of pressure and having a standard
approach across Grampian could aid communication and understanding. 
Risk 7 - Inability to achieve progress in relation to national Health and Wellbeing
Outcomes.  
Performance of services falls below acceptable level. 
Mitigating Actions – Service managers monitor performance regularly within their
teams and escalate any issues to the System Leadership Group (SLG) for further
discussion to provide wider support, developing shared ownership and a greater
understanding across the whole system. 
Key operational performance data is collated and circulated daily to all managers. 
A  Daily dashboard is held on illuminate for managers to access to ensure any
potential issues are identified quickly so action can be taken.  This dashboard is
being reviewed and will be further developed with the intention of further dashboards
to provide a whole system overview.  This has been discussed at SLG and agreed. 
Performance information is presented to the Performance sub group of Practice
Governance Group to inform Social Care managers of the trends in service
demands so that resources can be allocated appropriately. 
Risk 8 - Inability to progress with delivery of Strategic Objectives and
Transformation projects 
Mitigating Actions - Integrated Infrastructure Group previously established, with
ICT representation from NHS Grampian and Moray Council, to consider and provide
solutions to data sharing issues and ICT infrastructure matters which is an area that
will be taken forward alongside the Moray Growth Deal projects.  The Moray
Transformation Board has recently restarted and will link to all relevant groups 
Page 91

Page 92

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 23 
MANAGEMENT COMMENTARY (continued) 
HIGH (continued) 
Risk 9 - Requirements for support services are not prioritised by NHS Grampian
and Moray Council. 
Mitigating Actions – Membership of the Board was reviewed and revised to ensure
representation of all existing infrastructure processes and funding opportunities. 
Process for ensuring infrastructure change/investment requests developed.
Dr Gray’s strategy (vision for the future) is being produced collaboratively with input
from NHSG and HSCM management 
Development Aims for 2023/24 
Home First
Home First continues to be a key strategic theme in Moray and has led to changes in
the way we provide health and social care safely. Most notable are the developments
within frail elderly work stream and delays in discharge. Moray is now part of the
National Frail Elderly Collaborative and Hospital at Home Collaborative, the later has
the potential to secure short term funding for targeted project enablement. Delayed
discharges are lower than they were prior to Covid 19 in Moray, we are one of the few
partnerships who have achieved this. Further work will focus on embedding a
seamless, responsive, co-ordinated and multi-disciplinary approach and will be driven
by participation in the National programmes. Prevention will become a priority,
replacing reactive models by ensuring early identification, intervention and planning to
prevent poorer outcomes for those living with frailty and multi-morbidity. Home First is
linked into regional unscheduled care programmes, primary care plans and acute
services to prevent duplication and to ensure joint working that creates the right culture
and leadership to create sustainable positive change.  
Page 92

Page 93

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 24 
MANAGEMENT COMMENTARY (continued) 
The Strategic Plan 2019-29 was refreshed and adopted in November 2022, Partners
in Care 2022-32. The Medium Term Financial Strategy and other supporting plans
were reviewed in 2022/23. 
As the organisation continues to remobilise following the impacts of response, new,
transformational ways of working are being adopted and are informing our approach
to the delivery of the strategic objectives outlined in the plan. 
In addition we will seek to: 
• Continue to develop the system wide daily portfolio meeting to ensure system
wide oversight for operational staff at all points of the patient journey
• Ensure assurance and governance is part of everything we do
• Make links with Community Treatment and Care Service (CTAC), Vaccination
Transformation Programme (VTP), Community Response Team (CRT) and
Primary Care Improvement Plan (PCIP), in order to ensure a co-ordinated
workforce that is reactive to changes in activity. 
…………………………  ……………………… ……………………… 
Dennis Robertson    Simon Bokor-Ingram Deborah O’Shea 
Chair of Moray IJB   Chief Officer  Interim Chief 
Financial Officer 
Page 93

Page 94

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 25 
STATEMENT OF RESPONSIBILITIES 
Responsibilities of the MIJB 
• To make arrangements for the proper administration of its financial affairs and
to secure that it has an officer responsible for the administration of those affairs. 
In Moray Integration Joint Board, that officer is the Interim Chief Financial
Officer; 
• To manage its affairs to achieve best value in the use of its resources and
safeguard its assets; 
• Ensure the Annual Accounts are prepared in accordance with legislation (The
Local Authority Accounts (Scotland) Regulations 2014) and the Local Authority
(Capital Financing and Accounting) (Scotland) (Coronavirus) Amendment
Regulations 2021, and so far as is compatible with that legislation, in
accordance with proper accounting practices (section 12 of the Local
Government in Scotland Act 2003); and 
• To approve the Annual Accounts. 
I confirm that the Annual Accounts were approved by the MIJB at its meeting on 26
October 2023. 
Signed on behalf of the Moray Integration Joint Board 
Dennis Robertson
Chair of Moray IJB
Page 94

Page 95

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 26 
STATEMENT OF RESPONSIBILITIES (continued)
Responsibilities of the Interim Chief Financial Officer 
The Interim Chief Financial Officer is responsible for the preparation of the Moray
Integration Joint Board’s Annual Accounts in accordance with proper practices as
required by legislation and as set out in the CIPFA/LASAAC Code of Practice on Local
Authority Accounting in the United Kingdom (the Code). 
In preparing the Annual Accounts the Interim Chief Financial Officer has: 
• Selected suitable accounting policies and applied them consistently; 
• Made judgements and estimates that were reasonable and prudent; 
• Complied with legislation; and 
• Complied with the local authority code (in so far as it is compatible with
legislation). 
The Interim Chief Financial Officer has also: 
• Kept proper accounting records which were up to date; and 
• Taken reasonable steps for the prevention and detection of fraud and other
irregularities. 
I certify that the financial statements give a true and fair view of the financial position
of the Moray Integration Joint Board as at 31 March 2023 and the transactions for the
year then ended 
Deborah O’Shea FCCA
Interim Chief Financial Officer 
Page 95

Page 96

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 27 
REMUNERATION REPORT 
Introduction
This Remuneration Report is provided in accordance with the Local Authority Accounts
(Scotland) Regulations 2014 (SSI2014/200) as part of the MIJB annual accounts.  This
report discloses information relating to the remuneration and pension benefits of
specified MIJB members. 
All information disclosed in the tables is subject to external audit.  Other sections within
the Remuneration Report will be reviewed for consistency with the financial
statements. 
Moray Integration Joint Board
The voting members of MIJB are appointed through nomination by Moray Council and
the Grampian Health Board.  There is provision within the Order to identify a suitably
experienced proxy or deputy member for both the voting and non-voting membership
to ensure that business is not disrupted by lack of attendance by any individual. 
MIJB Chair and Vice-Chair
Nomination of the MIJB Chair and Vice-Chair post holders alternates every 18 months
between a Councillor and a Health Board non-executive member. 
The MIJB does not provide any additional remuneration to the Chair, Vice-Chair or
any other board members relating to their role on the MIJB.  The MIJB does not
reimburse the relevant partner organisations for any voting member costs borne by
the partner. 
The MIJB does not have responsibilities in either the current or in future years for
funding any pension entitlements of voting MIJB members.  Therefore no pension
rights disclosures are provided for the Chair or Vice-Chair. 
Taxable
Expenses
2021/22
Name Position Held Nomination
By
Taxable
Expenses
2022/23
£    £
- Dennis
Robertson
Vice-Chair
29/04/21 – 01/10/22
Chair 
1/10/22 to date
Grampian
Health Board -
- Cllr Tracy
Colyer
Chair
15/05/22 – 01/10/22
Vice-Chair
01/10/22 - date 
Moray
Council  - 
Page 96

Page 97

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 28 
REMUNERATION REPORT (continued) 
Officers of the MIJB
The MIJB does not directly employ any staff in its own right; however specific post-
holding officers are non-voting members of the Board. 
Chief Officer
Under section 10 of the Public Bodies (Joint Working) (Scotland) Act 2014 a Chief
Officer for the integration joint board has to be appointed and the employing partner
has to formally second the officer to the Board.  The employment contract for the Chief
Officer will adhere to the legislative and regulatory framework of the employing partner
organisation.  The remuneration terms of the Chief Officer‘s employment are approved
by the Board. 
Other Officers
No other staff are appointed by the MIJB under a similar legal regime.  Other non-
voting board members who meet the criteria for disclosure are included in the
disclosures below. 
Total
2021/22 Senior Employees Salary, Fees &
Allowances Total 2022/23
£  £ £
109,826 Simon Bokor-Ingram
Chief Officer  111,100 111,100
-
Deborah O’Shea
Interim Chief Financial
Officer
80,207 80,207
93,904
Tracey Abdy
Chief Financial Officer
(until 31.3.22)
- - 
In respect of officers’ pension benefits, the statutory liability for any future contributions
to be made rests with the relevant employing partner organisation.  On this basis there
is no pensions liability reflected on the MIJB balance sheet for the Chief Officer or any
other officers. 
The MIJB however has a responsibility for funding the employer contributions for the
current year in respect of the officer time spent on fulfilling the responsibilities of their
role on the MIJB.  The following table shows the MIJB’s funding during the year to
support the officers’ pension benefits.  The table also shows the total value of accrued
pension benefits which may include benefits earned in other employment positions
and from each officer’s own contributions. 
Page 97

Page 98

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 29 
NOTE: no bonuses, expenses allowances, compensation for loss of office or
any taxable benefits were made in 2022/23 
REMUNERATION REPORT (continued) 
In Year Pension
Contributions Accrued Pension Benefits  
Year to
31/03/22  Year to
31/03/23  
As at
31/03/2023 
Difference
from
31/03/2022 
£ £  £ 000’s £ 000’s 
Simon Bokor-
Ingram, Chief
Officer  22,954 23,220 
Pension  47 4
Lump Sum 88 1 
Deborah
O’Shea
Interim Chief
Financial
Officer 
- 11,716
Pension 25 25
Lump Sum 29 29 
Tracey Abdy
Chief Financial
Officer (until
31.3.22) 
18,562  -
Pension - -
Lump Sum - - 
Disclosure by Pay bands
As required by the regulations, the following table shows the number of persons whose
remuneration for the year was £50,000 or above, in bands of £5,000. 
Number of Employees in
Band 2021/22 Remuneration Band Number of Employees in
Band 2022/23
- £80,000 - £84,999 1
1 £90,000 - £94,999 -
1 £105,000 - £109,999 -
- £110,000 - £114,999 1 
Page 98

Page 99

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 30 
REMUNERATION REPORT (continued) 
Exit Packages
There were no exit packages agreed by the MIJB during 2022/23 financial year, or in
the preceding year. 
………………………..     ………………………
Dennis Robertson       Simon Bokor-Ingram
Chair of Moray IJB      Chief Officer                                                                                 
Page 99

Page 100

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 31 
ANNUAL GOVERNANCE STATEMENT 
The Annual Governance Statement describes the Moray Integration Joint Board’s
(MIJB) governance arrangements and reports on the effectiveness of the MIJB’s
system of internal control.   
Scope of Responsibility
The MIJB is responsible for ensuring that its business is conducted in accordance with
the law and appropriate standards, and that public money is safeguarded and used
efficiently and effectively in pursuit of best value. 
In discharging its responsibilities, the MIJB has established arrangements for its
governance which includes the system of internal control.  This system is intended to
manage risk and support the achievement of the MIJB’s policies, aims and objectives. 
The system provides reasonable but not absolute assurance of effectiveness. 
The MIJB places reliance of the systems of internal control of NHS Grampian systems
and Moray Council, which supports organisational compliance of policies and
procedures in addition to those of the MIJB.  Assurances are required on the
effectiveness of the governance arrangements of all three organisations, meaning a
significant failure in one of the three Partners may require to be disclosed in the annual
accounts of all three Partners. 
The Governance Framework 
The CIPFA/SOLACE framework for ‘Delivering Good Governance in Local
Government’ last updated in 2016 remains current and provides a structured approach
in defining seven principles that underpin effective governance arrangements.  Whilst
the framework is written specifically for Local Government, the principles apply equally
to integration authorities, and while the MIJB continues to evolve as an entity in its
own right. It continues to draw on the governance assurances of NHS Grampian and
Moray Council as its principal funding partners.   
Given the scope of responsibility within the MIJB and the complexities surrounding the
assurance arrangements, a Local Code of Corporate Governance was developed and
the MIJB assesses the effectiveness of its governance arrangements against the
principles set out in the document.  The Code outlines the seven governance principles
from the CIPFA/SOLACE guidance (as referenced below) and provides the sources
of assurance for assessing compliance relative to the MIJB, Moray Council and NHS
Grampian.  These assurances include referencing the governance arrangements of
NHS Grampian and Moray Council which are summarised annually and published in
their respective Annual Governance Statements which form part of the annual
accounts of each organisation.  The respective governance statements can be found
on the individual organisations websites: Moray Council: Annual Accounts - Moray
Council and NHS Grampian: https://www.nhsgrampian.org/about-us/annual-
accounts/ 
.
Page 100

Page 101

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 32 
ANNUAL GOVERNANCE STATEMENT (continued) 
Key Governance Arrangements 
Covid 19 had a significant impact on the MIJB and its approach to during the pandemic
involved the use of amended governance arrangements granted under delegated
powers. Work is now underway to revisit these arrangements to either reinstate them
or redesign them, depending on the new ways of working. Consideration will also be
given to how they integrate with the other Portfolios across the network in Grampian.
Any decisions or changes will be presented to the leadership groups and relevant
committees. 
All of the scheduled Audit Performance and Risk Committee meetings were held as
timetabled during 2022/23.  An interim arrangement (which is no longer in place at the
end of the year) was agreed for the operation of the Clinical and Care Governance
Committee whereby the Chair of the Committee received monthly updates on the key
issues arising during the pandemic response.  This related principally to the provision
of care, care home oversight and child and adult protection matters.   In addition the
Chief Officer committed to providing weekly updates on the emerging situation to IJB
Members, elected Members and staff. 
Health and Social Care Moray (HSCM) established an emergency response group
that has been operational since the end of March 2020, with the frequency of meetings
being adapted throughout the year dependent on the stage of response. 
Representation on the emergency response groups of the Partner organisations is
provided by HSCM staff, ensuring the necessary links and flow of information to
ensure a co-ordinated response on a pan Grampian basis and locally within Moray. 
The collaborative working across the whole system has continued during the Covid 19
recovery. The use of a Grampian Operation Performance Escalation System (GOPES)
was established to enable senior leaders to have oversight of where pressures were
located in the system and to direct responses accordingly.  This development has also
strengthened the identification of key metric thresholds to inform the levels for
escalation.  
Page 101

Page 102

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 33 
ANNUAL GOVERNANCE STATEMENT (continued) 
Evaluation of the Effectiveness of Governance
Governance Principle 1 – Behaving with integrity, demonstrating strong
commitment to ethical values and respecting the rule of law
Assessment of Effectiveness 
• The activities of the MIJB are directed by a Board comprising voting and non-
voting members. The Board meets every two months and draws its
membership from a broad range of sources. Formal Board meetings are
augmented by regular development sessions that focus in detail on specific
areas. The Board is also supported by an Audit, Performance and Risk
Committee, and a Clinical and Care Governance Committee, each with a
specific remit to support effective governance arrangements.  
• The MIJB operates in line with Standing Orders that govern proceedings of
the Board and its Committees, and which incorporates the Board’s Scheme
of Administration that deals with the Board’s committee structure and working
groups. 
• The MIJB has appointed a Standards Officer to support compliance with an
ethical standards framework in line with the Ethical Standards in Public Life
etc. (Scotland) Act 2000 whereby members of devolved public bodies such
as the MIJB are required to comply with Codes of Conduct, approved by
Scottish Ministers, together with guidance issued by the Standards
Commission. 
Page 102

Page 103

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 34 
ANNUAL GOVERNANCE STATEMENT (continued) 
Governance Principle 2 – Ensuring openness and comprehensive stakeholder
engagement 
Assessment of Effectiveness 
• Provision is made within MIJB’s Standing Orders for public and press access
to meetings and reports.  During the 2022/23 year there was a move to hybrid
meetings the need to broadcast live Board meetings continued.  A specific
web-site has been developed for Health and Social Care Moray and is
continuously monitored for improvement.  Agendas, reports and minutes for
all committees can be accessed via Moray Council website, in addition to all
the linked strategies of the MIJB.
• Both the voting and non-voting membership arrangements of the MIJB are in
line with the Public Bodies (Joint Working) (Integration Joint Boards)
(Scotland) Order 2014. There are eight voting members, four are elected
members appointed by Moray Council and four are non-executive members
of the NHS Grampian Board. The non-voting membership comprises six
professional members and five stakeholder members representing: staff,
third sector bodies carrying out activities in relation to health and social care,
service users and unpaid carers, and six additional non-voting members
which include the Chief Executives of Moray Council and NHS Grampian in
an Ex-officio capacity.  The broad membership of the MIJB ensures valued
input and engagement from a wide range of stakeholders.
• The Community Empowerment (Scotland) Act 2015 places a statutory duty
on MIJB and its Community Planning Partners to engage with communities
on the planning and delivery of services and securing local outcomes.  The
MIJB has an approved Communications and Engagement Strategy which
recognises and promotes the active and meaningful engagement with all
stakeholders.   
Governance Principle 3 – Defining outcomes in terms of sustainable
economic, social and environmental benefits 
Assessment of Effectiveness 
• The MIJB refreshed the 2019-2029 Strategic plan in 2022/23, which is supported
by various documents including a medium term financial framework.  The MIJB
Strategic Plan 2022-2032 is a continuation of the 2019 plan and the long-term
strategic objectives make room for adapting to challenges and developments in
health and social care over the coming years.  To deliver on these objectives a
12-month delivery plan is under development. 
• The plan is underpinned by a performance framework, workforce plan,
organisational development strategy, and a communications, engagement and
participation plan. Work is ongoing to update the workforce plan, whilst
considering how services can transform.
• The suite of documents are designed to identify outcomes and forward-thinking
on direction over the medium term.  Outcomes are closely linked to the delivery
of health and social care and the planned improvements for the population of
Moray. 
• A climate change duties report is collated and submitted annually on behalf of
the MIJB.
Page 103

Page 104

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 35 
ANNUAL GOVERNANCE STATEMENT (continued) 
Governance Principle 4 – Determining the interventions necessary to optimise
the achievement of intended outcomes 
Assessment of Effectiveness 
• The MIJB’s decision making process ensures that the members of the Board
receive objective and robust analysis of a variety of options indicating how the
intended outcomes will be achieved, providing information on the associated
risks and opportunities.   
• Board papers reflect the broad range of matters under consideration including
regular update reports by the Chief Officer on topical matters and agenda items
covering opportunities and challenges arising from reconfiguration of services. 
• The Financial Management Code promoted by CIPFA is recognised as a means
of assisting in ensuring good financial administration.  A medium term financial
strategy was approved by the MIJB in March 2023 and will be reviewed by
September 2023 to ensure alignment with the strategic plan, delivery plan and
to incorporate the delegation of children’s services. 
Governance Principle 5 – Developing the entity’s capacity, including the
capability of its leadership and the individuals within it
Assessment of Effectiveness 
• The Senior Management teams participated, in a two day Systems Leadership
Event led by The Kings Fund. The Systems Leadership Programme to support
the leadership teams was paused due to the Covid 19 response.  During the
Covid 19 response there has been increased opportunity to work collaboratively
across organisations through use of new technology. 
• The MIJB has met with Officers regularly for development sessions to increase
the opportunity for shared learning and constructive challenge. 
Page 104

Page 105

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 36 
ANNUAL GOVERNANCE STATEMENT (continued) 
Governance Principle 6 – Managing risk and performance through robust
internal control and strong public financial management
Assessment of Effectiveness 
• As part of a robust risk monitoring framework, the Strategic Risk Register is
reviewed and updated regularly and presented to every Audit, Performance and
Risk Committee.   A related action log was created for monitoring purposes and
is owned and monitored by the Senior Management Team.
• A Performance Management Framework has been developed.  Performance
reporting falls within the scope of the Audit, Performance and Risk Committee
and reporting is quarterly.
• The internal control system links closely with those of the Partners, given their
operational remit for delivery of services under direction of the MIJB.  The Audit,
Performance and Risk committee through its consideration of reports monitors
the effectiveness of internal control procedures.  The MIJB Chief Internal Auditor
undertakes an annual review of the adequacy of internal controls and the opinion
is included within this statement.
• The MIJB has an independent S95 Officer who is a member of the MIJB,
providing advice on all financial matters and ensure timely production and
reporting of budget estimates, budget monitoring reports and annual accounts.
• Governance arrangements have been developed and maintained to comply with
the core functions of various good framework guidelines including Code of
Practice on Managing the Risk of Fraud and Corruption, Public Sector Internal
Audit Standards (incorporating the principles of the Role of the Head of Internal
Audit), Audit Committees: Practical Guidance for Local Authorities and Police,
etc. 
Governance Principle 7 – Implementing good practices in transparency,
reporting and audit to deliver effective accountability
Assessment of Effectiveness 
• MIJB business is conducted through an approved cycle of Board meetings. 
During the year, recordings of Board meetings were made available to the
public.  Agendas, reports and minutes are available for the public to inspect. 
There is a standard reporting format in place to ensure consistency of approach
and consideration by Members to provide transparency in decision making.
• The MIJB publishes both Annual Accounts and an Annual Performance Report
following Board approval.
• The Chief Internal Auditor reports directly to the Audit, Performance and Risk
committee with the right of access to the Chief Officer, Interim Chief Financial
Officer and Chair of the Audit, Performance and Risk committee on any matter. 
The Chief Internal Auditor has continued to report to Committee during 2022/23. 
Page 105

Page 106

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 37 
ANNUAL GOVERNANCE STATEMENT (continued) 
Review of Adequacy and Effectiveness
The MIJB has a responsibility for conducting, at least annually, a review of the
effectiveness of the governance arrangements, including the system of internal
control.  The review is informed by the work of the Senior Management Team (which
has responsibility for the development and maintenance of the internal control
framework environment); the work of the Internal Auditors and the Chief Internal
Auditor’s annual report and the reports from the External Auditor and other review
agencies and inspectorates. 
Internal Audit Opinion 
Moray Council’s Internal Audit Section delivers the Internal Audit Service for the Moray
Integration Joint Board (MIJB), and the Council’s Audit and Risk Manager holds the
Chief Internal Auditor appointment to the MIJB until the 31st of March 2024. The
Council’s Internal Audit Section has adopted the Public Sector Internal Audit
Standards (PSIAS), which require the Chief Internal Auditor to deliver an annual
internal audit opinion and report, which has also been used to inform this governance
statement. 
The Chief Internal Auditor’s evaluation of the adequacy and effectiveness of the MIJB
framework of governance, risk management and internal control includes
consideration of the findings from the audit work undertaken by the Chief Internal
Auditor in his role as the Audit and Risk Manager for the Moray Council. Assurance is
also sought from the Internal Audit Service Provider for NHS Grampian of the
governance processes adopted by that organisation. In addition, reports issued by
other external review agencies are considered in the opinion provided by the Chief
Internal Auditor.   
Internal Audit operates independently within the organisation. While there have been
challenges due to changes in working practices with officers working from home,
management has imposed no limitations on the scope of audit work. In accordance
with PSIAS, the Chief Internal Auditor prepares a risk based Audit Plan for the MIJB,
which has regard to the internal audit arrangements of both the Moray Council and
NHS Grampian functions. 
The Annual Audit Plan for 2022/23 agreed to the following audits to be undertaken: 
• Care First System- An exercise to assess system management, security and
resilience of the Care First System used for the recording and management of
service user’s data.
• Self-Directed Support- Review of Self Directed Support financial monitoring
arrangements regarding Option 2/3, where care support packages to service
users are managed by Health and Social Care Moray or an Individual Service
Fund (ISF) Provider.
• Information Management- Ensure appropriate system exists in the
management, security and transfer of data between the Council and care
providers, including NHS Grampian.  
Page 106

Page 107

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 38 
ANNUAL GOVERNANCE STATEMENT (continued)
It is pleasing to report that all audits were undertaken and reported to the MIJB Audit,
Performance and Risk Committee. Findings from the reviews detailed significant
issues concerning the administrative arrangements in managing service users social
care packages, compliance with regulations and recording service user information. In
addition to the planned audits, reviews of Moray Council’s financial and administrative
systems were also reported to the MIJB Audit, Performance and Risk Committee. This
included testing a sample of creditor payments generated under the direction of the
Moray Integration Joint Board. The purpose of this audit was to confirm that effective
controls are operating to ensure all payments are appropriately authorised, accurate
and paid in accordance with regulations and agreed terms and conditions. Findings
noted further improvements required in the recording and processing of invoices. 
Internal Audit reports are regularly presented to members detailing not only findings
but also the responses by management to the recommendations with agreed
implementation dates. It was decided during the year that Internal Audit would also
report the findings from the follow up audits undertaken to confirm the implementation
of these recommendations. The follow up reviews completed into the financial
monitoring arrangements within the Self Directed Support Team for direct payments
made to service users and how Health and Social Care Officers manage income held
for individuals under Corporate Appointeeship Arrangements found a number of the
recommendations had not been implemented that required revised dates of
implementation to be agreed. 
The Chief Internal Auditor has previously raised concerns regarding an audit report to
the Audit, Performance and Risk Committee on 30 March 2023 that detailed the
outcome of a review undertaken by a private firm of auditors into how Health and
Social Care Moray Commissioning Service manages adult social care contracts. The
audit report detailed findings relating to governance, roles and responsibilities,
strategy/processes and contract management. A future report will be required by the
Chief Internal Auditor to confirm implementation 
The Chief Internal Auditor, after consideration of the results regarding the work carried
out by Internal Audit, taken together with other sources of assurance, with specific
reference to the external assessment into how the Commissioning Service manages
adult social care contracts; only limited assurance can be provided that the Moray
Integration Joint Board has adequate systems of governance and internal control, for
the year ended the 31st of March 2023 
Page 107

Page 108

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 39 
ANNUAL GOVERNANCE STATEMENT (continued) 
Prior Year Governance Issues 
The Annual Governance Statement for 2021/22 highlighted a number of areas for
development in looking to secure continuous improvement.  An assessment of
progress is provided below: 
Area for Improvement Identified in
2021/22 
Action Undertaken / Progress Made in
2022/23
Extending the Hospital Without Walls
model to move care closer to home, with
a shift to earlier intervention that reduces
the demands on acute hospital care. 
Developing the Portfolio approach for the
Moray Portfolio, and the interlink with the
other Portfolios in Grampian, along with
developing the governance framework
for this whole system approach 
Refresh the Strategic Plan during 2022,
building on the learning of the last 2
years of the pandemic, and the
transformational change that has begun 
Using the 2022/23 to 2026/27 Medium
Term Financial Framework to match the
ambitions of the Strategic Plan so that
services are sustainable 
Work with the Digital Health and Care
Innovation Centre as part of the Moray
Growth Deal to test new ways of working
that benefit the Moray population and
bring improvements to the delivery of
health and social care 
Development of Unscheduled Care
Action Plan with support from NHS
Grampian Transformation Team, with
more focus on front door of Dr Grays for
earlier intervention. Put in place
ambulatory emergency medical capacity
in Dr Grays. Joint work with Scottish
Ambulance Service around alternatives
to conveyance to hospital 
Continued to develop the local
governance with a Portfolio Board
approach. Links with other Portfolios
strengthened through participation in
their Portfolio Boards. Pan Grampian
governance approach continues to be
developed. 
IJB Strategic Plan refresh completed.
Reflects transition to post pandemic
recovery, recognising that we cannot
return to pre-pandemic way of delivery.
Strategy delivery plan in development 
Efficiency programme set out with
ambition for achieving best outcomes
within available resources 
Creation of 5 living labs to find digital
health solutions to health and social are
challenges. Aligned to SG Digital
Strategy. Includes workforce
development, supporting skills and
curriculum development 
Page 108

Page 109

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 40 
Area for Improvement Identified in
2021/22 
Action Undertaken / Progress Made in
2022/23
Continue to extend the reach of Self
Directed Support with an ambition for
Moray to be an exemplar in this arena
of supporting our residents in innovative
ways that promote independence and
choice 
With the potential delegation of
Children’s Social Work and Criminal
Justice to the Moray IJB, better align
service delivery in the Portfolio to the
benefit of our residents, where care is
seamless and access is clear 
Continue to explore innovative solutions
to meet personal outcomes through a
strength and asset based approach.  The
development of the Day Opportunities
team and SDS Enablers supports this
shift and has been recognised for its
innovative approach throughout
Scotland.  This includes an IMPACT
story by Health Improvement Scotland
and sharing of this at the Carers Leads
Meetings and Social Work Scotland. 
Development plans to be developed in
line with audit recommendations and the
national SDS Improvement plan to
further embed the SDS Standards. 
Revised Scheme of Integration approved
by Scottish Government on March 16th
2023, and now working closely with
Moray Council to ensure that
governance remains robust during the
transition 
Further Developments 
Following consideration of the review of adequacy and effectiveness, the following
action plan has been established to ensure continual improvement of the MIJB’s
governance arrangements and progress against the implementation of these issues
will be assessed as part of the next annual review. 
Areas of focus for 2023/24
1. Assurance and reporting for Children’s Social Work and Justice Services
2. Performance reporting at management level and to IJB APR Committee
3. Development of Strategic Risk Register for the IJB
4. IJB Category 1 responder status and Care for People Plan
5. Delivery against the strategic objectives in IJB Strategic Plan 
6. Compliance with audit recommendations and completion of outstanding actions 
Page 109

Page 110

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 41 
ANNUAL GOVERNANCE STATEMENT (continued) 
Key Governance challenges going forward will involve: 
• Providing capacity to meet statutory obligations whilst managing expectations
and rising demand for services, with a backlog of demand post Covid 19
pandemic, and the wider societal economic challenges now presented that
also potentially drive demand; 
• As a Board, difficult decisions will be required in balancing how we meet the
needs of our community whilst operating within the available resource
envelope; 
• Continue to address our work force challenges in respect of recruitment and
retention and where persistent vacancies will necessitate the need for
redesign; 
• Continuing to work closely with NHS Grampian, Moray Council and Moray
Community partnership to build on existing relationships and establishing
collaborative leadership, and to maximise the opportunities from an expanded
health and social care remit with the Portfolio approach, including Dr Grays
hospital, and how the IJB contributes to the wider community planning agenda
in Moray and the North East; 
• The challenges being faced from the legacy of the Covid 19 pandemic are
expected to be a continued focus for additional scrutiny for an extended period
of time, and how well we manage the recovery of service delivery. 
• Continue to implement the recommendations of internal and external audit,
including learning from national reviews. 
• Work with teams to provide assurance to MIJB that we have clear
governance structures for the integration of Children’s Social Work and
Criminal Justice Services into the partnership. 
• Work with teams to ensure governance arrangements adopted during the
pandemic and restored to either pre pandemic arrangements or are replaced
with new business as usual processes. 
• Contribute effectively to the national and UK Covid 19 enquiries, recognising
the demand on staff time. 
Page 110

Page 111

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 42 
ANNUAL GOVERNANCE STATEMENT (continued) 
Statement 
In our respective roles as Chair and Chief Officer of the MIJB, we are committed to
ensuring good governance and recognise the contribution it makes to securing
delivery of service outcomes in an effective and efficient manner.  This annual
governance statement summarises the MIJB’s current governance arrangements, and
affirms our commitment to ensuring they are regularly reviewed, developed and fit for
purpose.  Whilst recognising that improvements are required, as detailed earlier in the
statement, it is our opinion that a reasonable level of assurance can be placed upon
the adequacy and effectiveness of the MIJB’s governance arrangements. 
The immediate challenge will be to continue to meet all operational demands as we
continue to recover from the Covid 19 pandemic and the legacy that has impacted at
a socioeconomic level on our community. Pressure on financial settlements is
increasing, and we will continue to engage with our Partners and the wider community
to agree plans and outcomes that are both sustainable and achievable.  Taking those
forward will be challenging as we aim to fulfil the nine Health and Wellbeing national
health and well-being outcomes, and the strategic priorities identified and detailed in
our Strategic Plan.  Good governance remains an essential focus in delivering services
in a way that both meets the needs of communities and discharges statutory best value
responsibilities.
.
…………………………    ………………………
Dennis Robertson     Simon Bokor-Ingram
Chair of Moray IJB     Chief Officer 
Page 111

Page 112

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 43 
COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT 
This statement shows the cost of providing services for the year ended 31 March 2023
according to generally accepted accounting practices.   
2021/22  2022/23
Net Expenditure  Net Expenditure   
£ 000  £ 000
5,477 Community Hospitals 5,990
4,932 Community Nursing 5,163
9,691 Learning Disabilities 12,626
9,542 Mental Health 10,295
1,259 Addictions 1,588
158 Adult Protection & Health Improvement 167
16,238 Care Services Provided In-House 18,486
20,536 Older People & Physical & Sensory Disability
Services 23,441
1,828 Intermediate Care and Occupational Therapy 1,768
8,271 Care Services Provided by External Providers 8,084
8,460 Other Community Services 9,208
2,404 Administration & Management 2,425
1,192 Other Operational services 1,286
18,310 Primary Care Prescribing 19,283
18,307 Primary Care Services 19,058
4,632 Hosted Services 5,018
832 Out of Area Placements 1,232
758 Improvement Grants 888
7,937 Strategic Funds & Other Resources 8,858
13,044 Set Aside  13,917
153,808 Cost of Services 168,781   
(164,487) Taxation and Non-Specific Grant Income (note 5) (156,443)
(10,679) (Surplus) or Deficit on provision of Services 12,338
(10,679) Total Comprehensive Income and Expenditure 12,338 
There are no statutory or presentational adjustments which reflect the MIJB’s
application of the funding received from partners.  The movement in the General Fund
balance is therefore solely due to the transactions shown in the Comprehensive
Income and Expenditure Statement.  Consequently, an Expenditure and Funding
Analysis is not provided in these annual accounts. 
Page 112

Page 113

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 44 
MOVEMENT IN RESERVES STATEMENT 
This statement shows the movement in the year on the Moray Integration Joint Boards
(MIJB) reserves.  The movements which arise due to statutory adjustments which
affect the General Fund balance are separately identified from the movements due to
accounting practices.  Additional detail included within note 7 on page 50. 
Movement of Reserves During
2022/23  
General
Fund
Balance   
£000    
Opening Balance at 1 April 2022   (17,021)    
Total Comprehensive Income and
Expenditure 
12,338        
(Increase) or Decrease in 2022/23   12,338        
Closing Balance at 31 March 2023                    (4,683)     
Movement of Reserves During
2021/22  
General
Fund
Balance   
£000    
Opening Balance at 1 April 2021   (6,342)    
Total Comprehensive Income and
Expenditure 
(10,679)        
(Increase) or Decrease in 2021/22   (10,679)        
Closing Balance at 31 March 2022                    (17,021)     
Page 113

Page 114

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 45 
BALANCE SHEET 
The Balance Sheet shows the value of the Moray Integration Joint Board’s (MIJB)
assets and liabilities as at the balance sheet date.  The net assets of the MIJB (assets
less liabilities) are matched by the reserves held by the MIJB. 
31 March
2022
£000    Notes
31 March
2023
£000    
17,021 Short Term Debtors 6 4,683 
Current Assets      
- Short Term Creditors  - 
Current Liabilities      
- Provisions  -            
Long Term Liabilities      
17,021 Net Assets           4,683    
17,021 Usable Reserve General Fund 7 4,683            
17,021 Total Reserves  4,683 
The unaudited annual accounts were issued on 30 June 2023 and the audited annual
accounts were authorised for issue on 26 October 2023.
.
The Annual Accounts present a true and fair view of the financial position of the
MIJB as at 31 March 2023 and its income and expenditure for the year then ended. 
Deborah O’Shea FCCA 
Interim Chief Financial Officer 
Page 114

Page 115

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 46 
NOTES TO THE FINANCIAL STATEMENTS
Note 1 Significant Accounting Policies 
General Principles 
The Financial Statements summarise the Moray Integration Joint Board’s (MIJB)
transactions for the 2022/23 financial year and its position at the year-end of 31 March
2023. 
The MIJB was established under the requirements of the Public Bodies (Joint Working)
(Integration Joint Boards) (Scotland) Act 2014 and is a Section 106 body as defined
in the Local Government (Scotland) Act 1973. 
The Financial Statements are therefore prepared in compliance with the Code of
Practice on Local Authority Accounting in the United Kingdom 2022/23, supported by
International Financial Reporting Standards (IFRS), unless legislation or statutory
guidance requires different treatment. 
The accounts are prepared on a going concern basis, which assumes that the MIJB
will continue in operational existence for the foreseeable future.  The historical cost
convention has been adopted. 
Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when settlement in
cash occurs. In particular: 
• Expenditure is recognised when goods or services are received and their
benefits are used by the MIJB.
• Income is recognised when the MIJB has a right to the income, for instance by
meeting any terms and conditions required to earn the income, and receipt of
the income is probable.
• Where income and expenditure have been recognised but settlement in cash
has not taken place, a debtor or creditor is recorded in the Balance Sheet.
• Where debts may not be received, the balance of debtors is written down. 
Funding
The MIJB is primarily funded through funding contributions from the statutory funding
partners, Moray Council and the Grampian Health Board.  Expenditure is incurred as
the MIJB commissions’ specified health and social care services from the funding
partners for the benefit of service recipients in Moray area. 
Cash and Cash Equivalents
The MIJB does not operate a bank account or hold cash.  Transactions are settled on
behalf of the MIJB by the funding partners.  Consequently the MIJB does not present
a ‘Cash and Cash Equivalent’ figure on the balance sheet.  The funding balance due
to or from each funding partner as at 31 March is represented as a debtor or creditor
on the MIJB’s Balance Sheet.   
Page 115

Page 116

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 47 
NOTES TO THE FINANCIAL STATEMENTS (continued) 
Note 1 Significant Accounting Policies (continued) 
Employee Benefits
The MIJB does not directly employ staff.  Staff are formally employed by the funding
partners who retain the liability for pension benefits payable in the future.  The MIJB
therefore does not present a Pensions Liability on its Balance Sheet. 
The MIJB has a legal responsibility to appoint a Chief Officer.  More details on the
arrangements are provided in the Remuneration Report.  The charges from the
employing partner are treated as employee costs.  Where material the Chief Officer’s
absence entitlement as at 31 March is accrued, for example in relation to annual leave
earned but not yet taken. 
Charges from funding partners for other staff are treated as administration costs. 
Reserves
The MIJB’s reserves are classified as either Usable or Unusable Reserves.   
The MIJB’s only Usable Reserve is the General Fund.  The balance of the General
Fund as at 31 March shows the extent of resources which the MIJB can use in later
years to support service provision. 
Indemnity Insurance
The MIJB has indemnity insurance for costs relating primarily to potential claim
liabilities regarding Board members.  The Grampian Health Board and Moray Council
have responsibility for claims in respect of the services that they are statutorily
responsible for and that they provide. 
Unlike NHS Boards, the MIJB does not have any ‘shared risk’ exposure from
participation in the Clinical Negligence and Other Risks Indemnity Scheme (CNORIS). 
The MIJB participation in the CNORIS scheme is therefore analogous to normal
insurance arrangements. 
Note 2 Critical Judgements and Estimation Uncertainty 
In applying the accounting policies, the MIJB has had to make certain judgements
about complex transactions or those involving uncertainty about future events.  There
are no material critical judgements or estimation uncertainty. 
During the overall Covid 19 response, a number of additional costs have been incurred
beyond business as usual. The MIJB has followed national guidance regarding these
and a range of additional costs are included in the MIJB’s accounts reflecting the MIJB
acting as principal in the transactions including:-
• social care sustainability costs;
• all increase direct care Covid 19 costs;  
Page 116

Page 117

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 48 
NOTES TO THE FINANCIAL STATEMENTS (continued) 
Note 2 Critical Judgements and Estimation Uncertainty (continued) 
A further range of Covid 19 related costs and associated funding have not been
recognised in the MIJB’s accounts in accordance with national accounting guidance.
In these cases Moray Council is acting as principal and MIJB as the agent. This
includes:-
• £0.527m related to PPE and testing kits provided by NHS National Services
Scotland to Moray for social care services. 
Note 3 Events after the Reporting Period 
The unaudited accounts were issued by Deborah O’Shea, Interim Chief Financial
Officer on 29 June 2023 and the audited accounts were authorised for issue on 26
October 2023. Events taking place after this date are not reflected in the financial
statements or notes. 
Note 4 Expenditure and Income Analysis by Nature       
2021/22  2022/23
£000  £000
65,020 Services commissioned from Moray
Council
71,899
88,760 Services commissioned from The
Grampian Health Board
96,852
28 Auditor Fee: External Audit Work 30
153,808 Total Expenditure 168,781   
(164,487) Partners Funding Contributions and Non-
Specific Grant Income
(156,443)
(10,679) (Surplus) or Deficit on the Provision of
Services
12,338 
Page 117

Page 118

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 49 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 5 Taxation and Non-Specific Grant Income 
2021/22  2022/223
£000  £000
50,549 Funding Contribution from Moray Council 59,517
113,938 Funding Contribution from The Grampian
Health Board
96,926
164,487 Taxation and Non-specific Grant
Income
156,443 
The funding contribution from The Grampian Health Board shown above includes
£13.917m   in respect of ‘set aside’ resources relating to acute hospital and other
resources. These are provided by The Grampian Health Board who retains
responsibility for managing the costs of providing the services. The MIJB however has
responsibility for the consumption of, and level of demand placed on, these resources.   
Note 6 Debtors 
31 March
2022 
31 March
2023
£000  £000
15,739 The Grampian Health Board 2,846
1,282 Moray Council 1,837
17,021 Debtors 4,683 
Amounts owed by the funding partners are stated on a net basis. Creditor balances
relating to expenditure obligations incurred by the funding partners but not yet settled
in cash terms are offset against the funds they are holding on behalf of the MIJB. 
Page 118

Page 119

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 50 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 7 Usable Reserve: General Fund 
The MIJB holds a balance on the General Fund for two main purposes: 
• To earmark, or build up, funds which are to be used for specific purposes in the
future, such as known or predicted future expenditure needs. This supports
strategic financial management. 
• To provide a contingency fund to cushion the impact of unexpected events or
emergencies. This is regarded as a key part of the MIJB’s risk management
framework. 
The table below shows the movements on the General Fund balance: 
Earmarked
Reserves    
General
Reserves
PCIP &
Action 15
Covid 19 Other
Earmarked
Total  
£000 £000 £000 £000 £000
Balance at 1 April
2021 
1,598 1,667 2,725 352 6,342
Transfers (out)/in
2021/22 
(341) 664 6,291 4,065 10,679
Balance at 31
March 2022 
1,257 2,331 9,016 4,417 17,021
Transfer out
2022/23 
(1,257) (1,394) (9,016) (671) (12,338)
Transfers in
2022/23 
- - - - -
Balance at 31
March 2023 
- 937 - 3,746 4,683 
Primary Care Improvement Fund (PCIP) - The purpose of this fund is to ring fence
funding received from the Scottish Government as part of its Primary Care
Transformation Plan, this includes Action 15 funding as part of this plan. 
Covid 19 – are funds received by Scottish Government during 2021/22 being held in
an earmarked reserve to support the MIJB through the pandemic and
remobilisation.The balance of which was repaid back to Scottish Government. 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Page 119

Page 120

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 51 
Note 8 Agency Income and Expenditure 
On behalf of all IJB’s within The Grampian Health Board, the MIJB acts as the lead
manager for Grampian Medical Emergency Department (GMED) and Primary Care
Contracts.  It commissions services on behalf of the other IJBs and reclaims the costs
involved. The payments that are made on behalf of the other IJBs, and the
consequential reimbursement, are not included in the Comprehensive Income and
Expenditure Statement (CIES) since the MIJB is not acting as principal in these
transactions. 
The amount of expenditure and income relating to the agency arrangement is shown
below: 
2021/22  2022/23
£000  £000
9,136 Expenditure on Agency Services  10,139
(9,136) Reimbursement for Agency Services (10,139)
- Net Agency Expenditure excluded
from the CIES
-
Page 120

Page 121

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 52 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 9 Related Party Transactions 
The MIJB has related party relationships with The Grampian Health Board and Moray
Council.  In particular the nature of the partnership means that the MIJB may influence,
and be influenced by, its partners. The following transactions and balances included
in the MIJB’s accounts are presented to provide additional information on the
relationships.   
Transactions with the Grampian Health Board 
2021/22  2022/23
£000  £000
(113,938) Funding Contributions received from the
NHS Board
(96,926)
88,558 Expenditure on Services Provided by the      
NHS Board
96,695
202 Key Management Personnel: Non-Voting
Board Members
157
(25,178) Net Transactions with The Grampian
Health Board
(74) 
Key Management Personnel: The Chief Officer and Chief Financial Officer, are non-
voting Board members and are both employed by The Grampian Health Board and
recharged to the MIJB.  Details of the remuneration of both officers are provided in the
Remuneration Report.  The Chief Officer is a joint appointment made by Moray Council
and The Grampian Health Board and is jointly accountable to the Chief Executives of
both organisations, as such this post is jointly funded.  The Chief Financial Officer,
whilst a Board appointment, does not share this arrangement of funding. 
Balances with the Grampian Health Board 
31 March
2022 
31 March
2023
£000  £000
15,739 Debtor balances: Amounts due from The
Grampian Health Board
2,846
15,739 Net Balance due from The Grampian
Health Board
2,846 
Page 121

Page 122

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 53 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 9 Related Party Transactions (continued) 
Transactions with Moray Council 
2021/22  2022/23
£000  £000
(50,549) Funding Contributions received from the
Council
(59,517)
64,970 Expenditure on Services Provided by the
Council
71,852
78 Key Management Personnel: Non-Voting
Board Members
77
14,499 Net Transactions with Moray Council 12,412 
Balances with Moray Council 
31 March
2022 
31 March
2023
£000  £000
1,282 Debtor balances: Amounts due from Moray
Council
1,837
1,282 Net Balance due from Moray Council 1,837 
Page 122

Page 123

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 54 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 10 VAT 
The MIJB is not registered for VAT and as such VAT is settled or recovered by the
partners.  The VAT treatment of expenditure in the MIJB accounts depends on which
of the partners is providing the services as each of these partners are treated
differently for VAT purposes. 
VAT payable is included as an expense only to the extent that it is not recoverable
from Her Majesty’s Revenue and Customs. VAT receivable is excluded from income. 
Note 11 Accounting Standards That Have Been Issued but Have Yet To Be
Adopted 
The Code requires the MIJB to identify any accounting standards that have been
issued but have yet to be adopted and could have material impact on the accounts.   
There are no accounting standards issued but not yet adopted that impact on the
2022/23 financial statements.  
Page 123

Page 124

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 55 
INDEPENDENT AUDITOR’S REPORT
Independent auditor’s report to the members of Moray
Integration Joint Board and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
We certify that we have audited the financial statements in the
annual accounts of Moray Integration Joint Board for the year ended
31 March 2023 under Part VII of the Local Government (Scotland)
Act 1973. The financial statements comprise the Comprehensive
Income and Expenditure Statement, Movement in Reserves
Statement, Balance Sheet and notes to the financial statements,
including significant accounting policies. The financial reporting
framework that has been applied in their preparation is applicable
law and UK adopted international accounting standards, as
interpreted and adapted by the Code of Practice on Local Authority
Accounting in the United Kingdom 2022/23 (the 2022/23 Code).
In our opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the body as
at 31 March 2023 and of its income and expenditure for the
year then ended;
• have been properly prepared in accordance with UK adopted
international accounting standards, as interpreted and
adapted by the 2022/23 Code; and
• have been prepared in accordance with the requirements of
the Local Government (Scotland) Act 1973, The Local
Authority Accounts (Scotland) Regulations 2014, and the
Local Government in Scotland Act 2003. 
Basis for opinion
We conducted our audit in accordance with applicable law and
International Standards on Auditing (UK) (ISAs (UK)), as required by
the Code of Audit Practice approved by the Accounts Commission
for Scotland. Our responsibilities under those standards are further
described in the auditor’s responsibilities for the audit of the financial
statements section of our report. We were appointed by the
Accounts Commission on 18 May 2022. Our period of appointment is
five years, covering 2022/23 to 2026/27.  We are independent of the
body in accordance with the ethical requirements that are relevant to
our audit of the financial statements in the UK including the Financial
Reporting Council’s Ethical Standard, and we have fulfilled our other
ethical responsibilities in accordance with these requirements. Non-
audit services prohibited by the Ethical Standard were not provided 
Page 124

Page 125

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 56 
INDEPENDENT AUDITOR’S REPORT (Continued)
to the body. We believe that the audit evidence we have obtained is
sufficient and appropriate to provide a basis for our opinion.
Conclusions relating to going concern basis of accounting
We have concluded that the use of the going concern basis of
accounting in the preparation of the financial statements is
appropriate.
Based on the work we have performed, we have not identified any
material uncertainties relating to events or conditions that,
individually or collectively, may cast significant doubt on the body’s
ability to continue to adopt the going concern basis of accounting for
a period of at least twelve months from when the financial
statements are authorised for issue.
These conclusions are not intended to, nor do they, provide
assurance on the body’s current or future financial sustainability.
However, we report on the body’s arrangements for financial
sustainability in a separate Annual Audit Report available from the
Audit Scotland website.
Risks of material misstatement
We report in our Annual Audit Report the most significant assessed
risks of material misstatement that we identified and our judgements
thereon.
Responsibilities of the Interim Chief Financial Officer and
Moray Integration Joint Board for the financial statements
As explained more fully in the Statement of Responsibilities, the
Interim Chief Financial Officer is responsible for the preparation of
financial statements that give a true and fair view in accordance with
the financial reporting framework, and for such internal control as the
Interim Chief Financial Officer determines is necessary to enable the
preparation of financial statements that are free from material
misstatement, whether due to fraud or error.
In preparing the financial statements, the Interim Chief Financial
Officer is responsible for assessing the body’s ability to continue as a
going concern, disclosing, as applicable, matters related to going
concern and using the going concern basis of accounting unless
there is an intention to discontinue the body’s operations.
The Moray Integration Joint Board is responsible for overseeing the
financial reporting process.
Page 125

Page 126

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 57 
INDEPENDENT AUDITOR’S REPORT (Continued)
Auditor’s responsibilities for the audit of the financial
statements
Our objectives are to obtain reasonable assurance about whether
the financial statements as a whole are free from material
misstatement, whether due to fraud or error, and to issue an
auditor’s report that includes our opinion. Reasonable assurance is a
high level of assurance, but is not a guarantee that an audit
conducted in accordance with ISAs (UK) will always detect a
material misstatement when it exists. Misstatements can arise from
fraud or error and are considered material if, individually or in the
aggregate, they could reasonably be expected to influence the
decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with
laws and regulations. We design procedures in line with our
responsibilities outlined above to detect material misstatements in
respect of irregularities, including fraud. Procedures include:
• using our understanding of the local government sector to
identify that the Local Government (Scotland) Act 1973, The
Local Authority Accounts (Scotland) Regulations 2014, and
the Local Government in Scotland Act 2003 are significant in
the context of the body;
• inquiring of the Interim Chief Financial Officer as to other
laws or regulations that may be expected to have a
fundamental effect on the operations of the body;
• inquiring of the Chief Financial Officer concerning the body’s
policies and procedures regarding compliance with the
applicable legal and regulatory framework;
• discussions among our audit team on the susceptibility of the
financial statements to material misstatement, including how
fraud might occur; and
• considering whether the audit team collectively has the
appropriate competence and capabilities to identify or
recognise non-compliance with laws and regulations.
The extent to which our procedures are capable of detecting
irregularities, including fraud, is affected by the inherent difficulty in
detecting irregularities, the effectiveness of the body’s controls, and
the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to
detect than irregularities that result from error as fraud may involve
collusion, intentional omissions, misrepresentations, or the override 
Page 126

Page 127

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 58 
INDEPENDENT AUDITOR’S REPORT (Continued)
of internal control. The capability of the audit to detect fraud and
other irregularities depends on factors such as the skilfulness of the
perpetrator, the frequency and extent of manipulation, the degree of
collusion involved, the relative size of individual amounts
manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of
the financial statements is located on the Financial Reporting
Council's website www.frc.org.uk/auditorsresponsibilities. This
description forms part of our auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the
audited parts of the Remuneration Report
We have audited the parts of the Remuneration Report described as
audited. In our opinion, the audited parts of the Remuneration Report
have been properly prepared in accordance with The Local Authority
Accounts (Scotland) Regulations 2014.
Other information 
The Interim Chief Financial Officer is responsible for the other
information in the annual accounts. The other information comprises
the Management Commentary, Annual Governance Statement,
Statement of Responsibilities and the unaudited part of the
Remuneration Report. 
Our responsibility is to read all the other information and, in doing so,
consider whether the other information is materially inconsistent with
the financial statements or our knowledge obtained in the course of
the audit or otherwise appears to be materially misstated. If we
identify such material inconsistencies or apparent material
misstatements, we are required to determine whether this gives rise
to a material misstatement in the financial statements themselves. If,
based on the work we have performed, we conclude that there is a
material misstatement of this other information, we are required to
report that fact. We have nothing to report in this regard.
Our opinion on the financial statements does not cover the other
information and we do not express any form of assurance conclusion
thereon except on the Management Commentary and Annual
Governance Statement to the extent explicitly stated in the following
opinions prescribed by the Accounts Commission.  
Page 127

Page 128

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 59 
INDEPENDENT AUDITOR’S REPORT (Continued)
Opinions prescribed by the Accounts Commission on the
Management Commentary and Annual Governance Statement
In our opinion, based on the work undertaken in the course of the
audit:
• the information given in the Management Commentary for
the financial year for which the financial statements are
prepared is consistent with the financial statements and that
report has been prepared in accordance with statutory
guidance issued under the Local Government in Scotland
Act 2003; and
• the information given in the Annual Governance Statement
for the financial year for which the financial statements are
prepared is consistent with the financial statements and that
report has been prepared in accordance with the Delivering
Good Governance in Local Government: Framework (2016).
Matters on which we are required to report by exception
We are required by the Accounts Commission to report to you if, in
our opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the
Remuneration Report are not in agreement with the
accounting records; or
• we have not received all the information and explanations
we require for our audit. 
We have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to our responsibilities for the annual accounts, our
conclusions on the wider scope responsibilities specified in the Code
of Audit Practice, including those in respect of Best Value, are set
out in our Annual Audit Report.  
Page 128

Page 129

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2022/23 60 
INDEPENDENT AUDITOR’S REPORT (Continued)
Use of our report
This report is made solely to the parties to whom it is addressed in
accordance with Part VII of the Local Government (Scotland) Act
1973 and for no other purpose. In accordance with paragraph 108 of
the Code of Audit Practice, we do not undertake to have
responsibilities to members or officers, in their individual capacities,
or to third parties. 
Angela Pieri, (for and on behalf of Grant Thornton UK LLP),
110 Queen Street
Glasgow
G1 3BX 
Date……………………………………………………………. 
Page 129

Page 130

APPENDIX 1
Moray Integration Joint Board Annual Accounts 2022/23 61
Page 130

Page 131

APPENDIX 2 
Health & Social Care Moray    
Simon Bokor-Ingram
Chief Officer
Health & Social Care Moray
Moray Council HQ
High Street
ELGIN IV30 1BX
01343 563552
hscmchiefofficer@moray.gov.uk
www.hscmoray.co.uk   
Grant Thornton UK LLP
110 Queen Street,
Glasgow
G1 3BX 
Dear Sirs
Moray Integration Joint Board
Financial Statements for the year ended 31 March 2023
This representation letter is provided in connection with the audit of the financial
statements of Moray Integration Joint Board (the “IJB”) for the year ended 31 March
2023 for the purpose of expressing an opinion as to whether the IJB’s financial
statements are presented fairly, in all material respects in accordance with
International Financial Reporting Standards, and the CIPFA/LASAAC Code of
Practice on Local Authority Accounting in the United Kingdom 2022/23 and
applicable law. 
We confirm that to the best of our knowledge and belief having made such inquiries
as we considered necessary for the purpose of appropriately informing ourselves:
Financial Statements
i. We have fulfilled our responsibilities for the preparation of the IJB’s financial
statements in accordance with International Financial Reporting Standards
and the CIPFA/LASAAC Code of Practice on Local Authority Accounting in
the United Kingdom 2022/23 ("the Code"); in particular the financial
statements are fairly presented in accordance therewith.
ii. We have complied with the requirements of all statutory directions affecting
the IJB and these matters have been appropriately reflected and disclosed in
the financial statements.
iii. The IJB has complied with all aspects of contractual agreements that could
have a material effect on the financial statements in the event of non-
Item 4.
Page 131

Page 132

compliance. There has been no non-compliance with requirements of any
regulatory authorities that could have a material effect on the financial
statements in the event of non-compliance.
iv. We acknowledge our responsibility for the design, implementation and
maintenance of internal control to prevent and detect fraud.
v. We are satisfied that the methods, the data and the significant assumptions
used by us in making accounting estimates and their related disclosures are
appropriate to achieve recognition, measurement or disclosure that is
reasonable in accordance with the Code and adequately disclosed in the
financial statements.  In this context we confirm there are no significant
assumptions and accounting estimates.  
vi. Except as disclosed in the financial statements:
a. there are no unrecorded liabilities, actual or contingent
b. none of the assets of the IJB has been assigned, pledged or
mortgaged
c. there are no material prior year charges or credits, nor exceptional or
non-recurring items requiring separate disclosure.
vii. Related party relationships and transactions have been appropriately
accounted for and disclosed in accordance with the requirements of
International Financial Reporting Standards and the Code.
viii. All events subsequent to the date of the financial statements and for which
International Financial Reporting Standards and the Code require adjustment
or disclosure have been adjusted or disclosed.
ix. Actual or possible litigation and claims have been accounted for and disclosed
in accordance with the requirements of International Financial Reporting
Standards.
x. We have no plans or intentions that may materially alter the carrying value or
classification of assets and liabilities reflected in the financial statements.
xi. We have updated our going concern assessment. We continue to believe that
the IJB financial statements should be prepared on a going concern basis and
have not identified any material uncertainties related to going concern on the
grounds that : 
a. the nature of the IJB means that, notwithstanding any intention to
cease its operations in their current form, it will continue to be
appropriate to adopt the going concern basis of accounting because, in
such an event, services it performs can be expected to continue to be
delivered by related public authorities and preparing the financial
statements on a going concern basis will still provide a faithful
representation of the items in the financial statements
b. the financial reporting framework permits the entry to prepare its
financial statements on the basis of the presumption set out under a)
above; and 
c. the IJB system of internal control has not identified any events or
conditions relevant to going concern.
Page 132

Page 133

We believe that no further disclosures relating to the IJB’s ability to continue
as a going concern need to be made in the financial statements 
xii. The IJB has complied with all aspects of ring-fenced grants that could have a
material effect on the IJB’s financial statements in the event of non-
compliance.
Information Provided
xiii. We have provided you with:
a. access to all information of which we are aware that is relevant to the
preparation of the IJB’s financial statements such as records,
documentation and other matters;
b. additional information that you have requested from us for the purpose
of your audit; and
c. access to persons within the Council and NHS via remote
arrangements from whom you determined it necessary to obtain audit
evidence.
xiv. We have communicated to you all deficiencies in internal control of which
management is aware.
xv. All transactions have been recorded in the accounting records and are
reflected in the financial statements.
xvi. We have disclosed to you the results of our assessment of the risk that the
financial statements may be materially misstated as a result of fraud. 
xvii. We have disclosed to you all information in relation to fraud or suspected
fraud that we are aware of and that affects the IJB and involves:
a. management;
b. employees who have significant roles in internal control; or
c. others where the fraud could have a material effect on the financial
statements.
xviii. We have disclosed to you all information in relation to allegations of fraud, or
suspected fraud, affecting the financial statements communicated by
employees, former employees, analysts, regulators or others.
xix. We have disclosed to you all known instances of non-compliance or
suspected non-compliance with laws and regulations whose effects should be
considered when preparing financial statements.
xx. We have disclosed to you the identity of the IJB’s related parties and all the
related party relationships and transactions of which we are aware.
xxi. We have disclosed to you all known actual or possible litigation and claims
whose effects should be considered when preparing the financial statements.
Page 133

Page 134

Annual Governance Statement
xxii. We are satisfied that the Annual Governance Statement (AGS) fairly reflects
the IJB’s risk assurance and governance framework and we confirm that we
are not aware of any significant risks that are not disclosed within the AGS.
Narrative Report
xxiii. The disclosures within the Narrative Report fairly reflect our understanding of
the IJB’s financial and operating performance over the period covered by the
IJB’s financial statements.
Approval
The approval of this letter of representation was minuted by the IJB Board at its
meeting on 26 October 2023. 
Yours faithfully 
Simon Bokor-Ingram
Chief Officer, Moray HSCP and Moray Portfolio Lead   
Signed on behalf of the Moray Integration Joint Board 
Page 134

Page 135

REPORT TO: MORAY INTEGRATION JOINT BOARD ON 26 OCTOBER 2023 
SUBJECT: MEMBERSHIP OF BOARD AND COMMITTEES 
BY:  CORPORATE MANAGER 
1. REASON FOR REPORT 
1.1. To inform the Board of changes to Membership of the Moray Integration Joint
Board (MIJB), Audit, Performance and Risk Committee and Clinical and Care
Governance Committee (CCG).  
2. RECOMMENDATION 
2.1. It is recommended that the Board notes: 
i) the confirmation of appointment of a new member to the MIJB
following changes to Moray Council’s committee appointments; 
ii) the vacancies in National Health Service (NHS) voting membership
and Service User Stakeholder position; and 
iii) the updated membership of Board and committees attached at
APPENDIX 1 
3. BACKGROUND 
3.1 The Public Bodies Joint Working (Scotland) Act 2014 (“the Act”) and the Public
Bodies (Joint Working) (Integration Joint Boards) (Scotland) Order 2014 (“the
Order”) make provisions about various matters including the membership of the
MIJB. As a minimum this must comprise voting members nominated from the
NHS Board and Council; co-opted non-voting members who are holders of key
posts with the NHS and Council or the MIJB; and co-opted non-voting members
who are representatives of groups who have an interest in the MIJB. There is
flexibility to appoint additional non-voting members as the Board sees fit. The
Moray Health and Social Care Integration Scheme (“Integration Scheme”)
outlines certain agreed provisions re membership (and includes the specific
provisions taken from the Act and the Order). 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
Item 5.
Page 135

Page 136

4.1. Following two resignations from the NHS Grampian Board a reshuffle of NHS
Grampian members on Integration Joint Boards (IJBs) in Aberdeen City,
Aberdeenshire and Moray took place to manage these vacancies in IJB
membership until their replacements are appointed by Scottish Government. 
As of 17 October 2023, Professor Bhattacharya moved to Aberdeen City IJB.
This means MIJB is currently reduced to 3 NHS voting members. 
4.2. Cllr Ben Williams joins the MIJB, following changes to Moray Council’s
committee appointments. 
4.3. Ms Thatcher has resigned from her position as Service User Stakeholder. The
recruitment process to fill the vacancy will be followed in due course. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Partners in Care 2022-32”
Effective governance arrangements support the development and
delivery of priorities and plans. 
(b) Policy and Legal
The Board, through its approved Standing Orders for Meetings,
established under the Public Bodies (Joint Working) (Integration Joint
Board) (Scotland) Order 2014, ensures that affairs are administered in
accordance with the law, probity and proper standards. 
(c) Financial implications
There are no financial implications arising as a direct result of this report. 
(d) Risk Implications and Mitigation
There are no risk implications arising as a direct result of this report. 
(e) Staffing Implications
There are no staffing implications arising as a direct result of this report. 
(f) Property
There are no property implications arising as a direct result of this report. 
(g) Equalities/Socio Economic Impact
An Equalities Impact Assessment is not required as the report is to
inform the Board of changes required to membership of the Board and
CCG Committee. 
(h) Climate Change and Biodiversity Impacts
None arising from this report. 
(i) Directions
None arising from this report. 
(j) Consultations
Consultation on this report has taken place with Chief Officer – Health
and Social Care Moray and Caroline O’Connor, Committee Services
Officer, Moray Council, who are in agreement with the report.
Page 136

Page 137

6. CONCLUSION 
6.1. This paper sets out the position in relation to the membership of MIJB. 
Author of Report:  Isla Whyte, Interim Support Manager
Background Papers:  None
Ref:   
Page 137

Page 138

Page 138

Page 139

APPENDIX 1
Moray Integration Joint Board Vacancies – as at 18 October 2023 
Moray Integration Joint Board 
4 Council voting members Tracy Colyer (Vice-Chair)
Ben Williams
Peter Bloomfield
Scott Lawrence
4 NHS Grampian voting members Dennis Robertson (Chair)
Derick Murray
Sandy Riddell
Vacancy
Third Sector Stakeholder  Graham Hilditch
NHS Grampian Staff Representative Stakeholder
Member
Stuart Falconer
Carer Stakeholder  Ivan Augustus
Service User Stakeholder Vacancy
Moray Council Staff Representative Kevin Todd
Chief Officer Professional Simon Bokor-Ingram
Chief Social Work Officer Tracy Stephen
Lead Nurse  Jane Ewen
GP Lead  Dr Robert Lockhart
Dr Malcolm Simmons
Non Primary Medical Services Lead Prof Duff Bruce
Additional Member  Elizabeth Robinson 
Audit, Performance and Risk Members
(note chair needs to be alternate partnership member to the Chair of MIJB)
2 Council voting members  Ben Williams
Scott Lawrence (Chair)
2 Health Board voting members  Sandy Riddell 
Derick Murray
Third Sector Stakeholder  Graham Hilditch
NHS Grampian Staff Representative Stakeholder
Member 
Stuart Falconer 
Clinical and Care Governance Members 
2 Council voting member Cllr Peter Bloomfield 
Cllr Scott Lawrence
2 Health Board voting member (Chair) Derick Murray (Chair)
Vacancy
Carer Stakeholder  Ivan Augustus
Service User Stakeholder Vacancy 
Third Sector Stakeholder Graham Hilditch
Moray Council Staff Representative Kevin Todd
Chief Officer Professional Simon Bokor-Ingram
Chief Social Work Officer Tracy Stephen
Lead Nurse  Jane Ewen
Item 5.
Page 139

Page 140

APPENDIX 1
GP Lead  Dr Robert Lockhart and Dr
Malcolm Simmons
Non Primary Medical Services Lead Prof Duff Bruce
Additional Member  Elizabeth Robinson 
Page 140