Democracy Spraffa

Agenda Document Pack - Council - 24/09/2026

Renfrewshire Council · 24 September 2026
Back to Council — 24 September 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

17/09/2026 
Notice of Meeting and Agenda
Council 
Date Time Venue
Thursday, 24 September
2026
09:30 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Provost Lorraine Cameron (Convener): Councillor Iain Nicolson (Leader): Councillor Cathy
McEwan (Depute Convener): Councillor Jacqueline Cameron (Depute Leader):  
Councillor Jennifer Adam: Councillor Fiona Airlie-Nicolson: Councillor Alison Ann-Dowling:
Councillor Stephen Burns: Councillor Michelle Campbell: Councillor Graeme Clark: Councillor
Carolann Davidson: Councillor Eddie Devine: Councillor Andy Doig: Councillor Audrey Doig:
Councillor Chris Gilmour: Councillor Edward Grady: Councillor Gillian Graham: Councillor Neill
Graham: Councillor John Gray: Councillor Anne Hannigan: Councillor John Hood: Councillor
Lisa-Marie Hughes: Councillor Robert Innes: Councillor Alec Leishman: Councillor Bruce
MacFarlane: Councillor James MacLaren: Councillor Kenny MacLaren: Councillor Mags
MacLaren: Councillor Colin McCulloch: Councillor Janis McDonald: Councillor David McGonigle:
Councillor Jamie McGuire: Councillor Marie McGurk: Councillor Iain McMillan: Councillor John
McNaughtan: Councillor Kevin Montgomery: Councillor Sam Mullin: Councillor Will Mylet:
Councillor Jim Paterson: Councillor Emma Rodden: Councillor John Shaw: Councillor Ben Smith:
Councillor Andy Steel: 
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish. 
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting.
MARK CONAGHAN
Head of Corporate Governance
Page 1 of 392

Page 2

17/09/2026 
Webcasting of Council Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Provost will confirm if all or part of the meeting is being
filmed.  Generally the public seating areas will not be filmed.  The cameras focus on the main
participants.  If you have any queries regarding this please contact Committee Services on
democratic-services@renfrewshire.gov.uk. 
To find the webcast please navigate to: https://renfrewshire.public-i.tv/core/portal/home and
select the meeting from the calendar. 
Further Information
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at  http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk   
Information Bulletin
To reduce the reporting of routine operational matters to Policy Boards, to allow Boards to focus
on major policy issues and to streamline business for Members’ consideration and
determination, a Bulletin, issued in line with the Council meeting timetable, is produced. The
Bulletin is intended to provide members with a concise summary of significant decisions and
action taken by officers in the exercise of their delegated powers, and details of issues which do
not require a decision. A copy of the Bulletin has been published with this agenda. 
Page 2 of 392

Page 3

17/09/2026 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a transparency
statement in any item(s) on the agenda and to provide a brief
explanation of the nature of the interest or the transparency statement. 
1 Provost's Update
Hear from Provost 
2 Azets Report to those charged with Governance –
Renfrewshire Council Group Annual Accounts 2025/26
Report by Director of Finance & Resources 
9 - 126 
3 Audited Annual Accounts 2025/26 – Renfrewshire Council
Group
Report by Director of Finance & Resources 
127 - 254 
4 Azets Report to those charged with Governance – Coats
Observatory Trust Annual Accounts 2025/26
Report by Director of Finance & Resources 
255 - 290 
5 Audited Financial Statements 2025/26 – Coats
Observatory Trust
Report by Director of Finance & Resources 
291 - 308 
6 Financial Outlook and Medium-term Financial Plan
Report by Director of Finance & Resources 
309 - 326 
7 Public Service Reform
Report by Chief Executive 
327 - 334 
8 Governance Arrangements
Report by Director of Finance & Resources 
335 - 338
Page 3 of 392

Page 4

17/09/2026 
9 Renfrewshire Community Protection Chief Officers Group
– Annual Report 2025/26
Report by Chief Executive 
339 - 384 
10  Sustainable Future Programme – Renfrewshire Health
and Social Care Partnership
Report by Chief Social Work Officer 
385 - 392 
11  Notice of Motion 1 by Councillors Andy Doig and Hood
"GDPR 
“This Council supports the general principles behind the Data Protection
Act 2018 but views with continued concern the practice of Health
Boards, Housing Associations, Renfrewshire Health and Social Care
Partnership, and other public bodies, of requiring MPs, MSPs, and
Councillors to obtain a signed mandate form from constituents in order
to represent them. 
Council requests that the Chief Executive write to the Board of
NHSGGC, those housing associations operating in Renfrewshire, and
Renfrewshire Health and Social Care Partnership, and ask them to
remind their staff that, under data protection legislation, no mandate is
required where an elected member is acting on behalf of a constituent."" 
12  Notice of Motion 2 by Councillors Andy Doig and Devine
"COSLA Evaluation of Direct Labour Organisations 
This council is concerned at the bureaucracy, inefficiency, and negative
impact on delivery of services caused as a direct result of the Local
Government Act 1988, with its drive towards compulsory competitive
tendering. Particularly in terms of housing repairs which inconveniences
constituents. 
Council accordingly calls on COSLA to conduct a national evaluation of
the respective costs of continued CCT compared to the re-establishment
of Direct Labour Organisations, and to report back to its member local
authorities with recommendations as to further action." 
13  Notice of Motion 3 by Councillors McDonald and Clark
"60th Anniversary of Glasgow Airport 
Council notes that 2nd May 2026 marked the 60th anniversary of
Glasgow Airport. 
Council recognises the major economic contribution Glasgow Airport
makes to Renfrewshire and Scotland, supporting thousands of jobs,
tourism, inward investment, logistics, and acting as an essential platform
for Scotland’s export economy. 
Page 4 of 392

Page 5

17/09/2026 
Council commends Glasgow Airport’s long history of community
involvement, including its FlightPath Fund and the service expansions
announced this year." 
14  Notice of Motion 4 by Councillors G Graham and McMillan
"Review of Legislation and Guidance on Domestic EV Charge Point
Installations 
Council notes the growth of domestic electric vehicle charge point
installations, including at flats, shared parking areas and homes
dependent on on-street parking. 
Council further notes that responsibility is fragmented across planning,
building standards, roads, electrical safety, Distribution Network
Operators, smart charger regulations and private property consent. 
Council believes this disjointed framework leaves councils without the
clear powers needed to prevent unsafe, unauthorised or obstructive
installations and to protect residents and the public. Council therefore
agrees to write to the Department of Energy and Net Zero for urgent
national guidance, and robust model enforcement powers for councils." 
15  Notice of Motion 5 by Councillors Gilmour and G Graham
"100 Years of Hendersons Flowers, Johnstone 
This Council congratulates Hendersons Flowers, a valued family
business in Johnstone, on marking 100 years of service to the town and
communities beyond. 
Council recognises the dedication of generations of the Henderson
family and staff, whose hard work has helped the business remain an
important part of Johnstone’s local economy and community life. 
Council extends its thanks and best wishes to Hendersons Flowers as it
celebrates this significant milestone and looks forward to its continued
success in the years ahead." 
16  Notice of Motion 6 by Councillors Andy Doig and Gilmour
"The Community Asset Transfer Process in Renfrewshire and
Community Consultation 
This Council recognises that community consultation is a critical,
significant, and legally mandated part of the CAT process under the
Community Empowerment (Scotland) Act 2015, but notes that there is
concern across Renfrewshire about the depth and range of some
community consultations in particular cases. 
Council further agrees, in the light of these concerns, to extend the
statutory consultation period from twenty to forty working days." 
Page 5 of 392

Page 6

17/09/2026 
17  Notice of Motion 7 by Councillors Audrey Doig and Innes
"Our Lady of Peace Primary School and the 2026 Scots Language
Awards 
This Council congratulates the staff, parents, and pupils of Our Lady of
Peace Primary School in Linwood for being nominated at the recent
prestigious Scots Language Awards for the Schuil o the Year. 
Council notes with pride that it was the only primary school amongst five
nominees for that specific category, the rest being secondary schools.
We further celebrate Scots as one of our indigenous languages and
recognise the role of Our Lady of Peace Primary in highlighting its value
in the cultural life of Scotland." 
18  Notice of Motion 8 by Councillors Innes and J Cameron
"“Abolition of the House of Lords” 
Council notes that the House of Lords remains an unelected legislative
chamber, with members appointed rather than elected by the public, yet
they are able to scrutinise, amend and vote on legislation affecting the
people of Scotland. 
Council further notes that successive UK Governments have promised
reform of the House of Lords, yet it remains fundamentally unelected
and unaccountable to the electorate. 
Council believes that, in a modern democracy, those exercising
legislative power should be directly accountable to the people they
represent, and that an unelected chamber based on appointment and
patronage is incompatible with democratic accountability. 
Council therefore calls for the abolition of the House of Lords and urges
the UK Government to replace it with a democratic and directly elected
alternative. 
Council further agrees to write to the Prime Minister and Secretary of
State for Scotland urging the UK Government to bring forward legislation
to deliver this reform." 
19  Notice of Motion 9 by Councillors G Graham and
Davidson
"Recognising the 50th Anniversary of Scottish Women’s Aid 
This Council recognises the 50th anniversary of Scottish Women’s Aid
and pays tribute to its pioneering role in supporting women, children and
young people affected by domestic abuse. 
Furthermore, Council highlights Women’s Aid’s leading role in national 
Page 6 of 392

Page 7

17/09/2026 
advocacy; strengthening specialist services; challenging stigma; and
helping shape public understanding and policy in Scotland. 
Council commends the courage of survivors and the dedication of
Scottish Women’s Aid staff and volunteers nationally and here in
Renfrewshire. And agrees that the Chief Executive write to Scottish
Women’s Aid to mark the anniversary and express appreciation for its
work." 
20  Notice of Motion 10 by Councillor Audrey Doig and
Provost L Cameron
"Commemorative Plaque to Honour the Life of Dolly Rebecca
Parton 
This Council recognises the immense cultural and musical contribution
of Dolly Parton, singer-songwriter, actress, and businesswoman, and in
particular, her ground-breaking Imagination Library initiative which has
brought great benefit to the children of Renfrewshire. 
Council agrees, as a lasting tribute to her promotion of the Imagination
Library locally, to erect a plaque within Paisley Central Library in honour
of her life and achievements." 
21  Notice of Motion 11 by Councillors Hughes and Audrey
Doig
"Spinal Cord Injury Awareness Month 
Renfrewshire Council recognises that September is Spinal Cord Injury
Awareness Month and supports its key aims of honouring those living
with Spinal Cord Injuries (SCIs), supporting the development of new
treatments and therapies, and raising awareness of symptoms and
early warning signs of SCIs. 
Renfrewshire Council further notes that whilst several new therapies are
in development, there is currently no cure for SCIs, and that therefore
awareness of the symptoms of SCIs is critical in early diagnosis and in
supporting improved outcomes." 
22  Notice of Motion 12 by Councillors J Cameron and Adam
"Stacy’s Law 
Council supports calls for a “Stacy’s Law” in memory of Renfrewshire
resident Stacy Hunter who was murdered by her estranged husband in
July of this year. The petition supported by Stacy’s family calls for high-
risk domestic abuse perpetrators on bail to have their location monitored
using GPS equipment. 
Council notes that domestic abuse charges have increased in Scotland
by 14 per cent last year and agrees that challenging these behaviours is
an issue for us all. Council welcomes the measures outlined in Scottish 
Page 7 of 392

Page 8

17/09/2026 
Government’s Programme for Government to tackle misogyny and male
violence against women and girls." 
Page 8 of 392

Page 9

1 
PUBLIC
___________________________________________________________________
To: Council
On: 24 September 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Azets Report to those charged with governance - Renfrewshire Council 
Group Annual Accounts 2025/26
___________________________________________________________________
1. Summary
1.1 Each year the Council’s appointed external auditors carry out an audit of
the Council’s financial statements and provide an opinion as to whether
those statements provide a true and fair view of the financial position of the
Council, and its income and expenditure for the year; and also whether they
have been prepared in accordance with the Local Government (Scotland)
Act 1973. 
1.2 In accordance with International Auditing Standards (ISA260), the external
auditor, Azets, is obliged to report to those charged with the governance of
the organisation matters which have arisen in the course of the audit. 
1.3 The attached ISA260 report from Azets outlines their findings from the audit
of the 2025/26 the Renfrewshire Council Group accounts. 
1.4 Under the Local Authority Accounts (Scotland) Regulations 2014, the
Council must meet to consider the Annual Accounts and aim to approve
those accounts for signature no later than 30 September. 
1.5 Azets officers will attend the Council meeting to present their reports.
1.6 There were three material audit adjustments made to the annual accounts
over the course of the audit. The figures and details are listed on page 87 of
the Annual Audit Report, and can be explained as follows:
Item 2
Page 9 of 392

Page 10

2 
PUBLIC
• Property Plant and Equipment – To reverse incorrect reclassification of
two assets from Other Land and Buildings to Infrastructure as the assets
remain separate to the land;
• Property Plant and Equipment – To write down nil book value assets that
the Council have not been able to verify;
• Common Good Note – Renfrew Common Good understated short term
deposits and revaluation reserve of fixed assets;
1.7 Other minor and presentational changes were also agreed, along with the
disclosure changes outlined on page 88 of the Annual Audit Report.
_________________________________________________________________________________
2. Recommendations
2.1 Members are requested to consider the attached report from Azets.
___________________________________________________________________
Implications of the Report
1. Financial
The 2025/26 Annual Accounts demonstrate that the Council continues to
operate services within the resources available, and in line with the relevant
legislation.
2. HR & Organisational Development 
There are no direct implications arising from the recommendations in this
report.
3. Community/Council Planning 
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital
spend ensures that its facilities are fit
for purpose and safe for the
community, to maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe 
Council Plan
Reshaping our place, our
economy and our future
The Council’s revenue and capital
spend ensures that its facilities are fit
for purpose and safe for the
community, to maximise accessibility.
Building strong, safe and resilient
communities
Tackling inequality, ensuring
opportunities for all
Page 10 of 392

Page 11

3 
PUBLIC
Council Plan
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the
Council has resources now and in the
future for continued service delivery.
Working together to improve
outcomes 
4. Legal 
An audit opinion free from qualification demonstrates the Council’s
compliance with the statutory accounting requirements set out in the Local
Government (Scotland) Act 1973 and the Local Government in Scotland Act
2003.
5. Property/Assets
There are no direct implications arising from the recommendations in this
report.
6. Information Technology 
There are no direct implications arising from the recommendations in this
report.
7. Equality & Human Rights 
There are no direct implications arising from the recommendations in this
report.
8. Health & Safety
There are no direct implications arising from the recommendations in this
report.
9. Procurement 
There are no direct implications arising from the recommendations in this
report.
10. Risk 
There are no direct implications arising from the recommendations in this
report.
11. Privacy Impact 
There are no direct implications arising from the recommendations in this
report.
Page 11 of 392

Page 12

4 
PUBLIC
12. Cosla Policy Position 
There are no direct implications arising from the recommendations in this
report.
13. Children’s Rights
There are no direct implications arising from the recommendations in this
report.
14. Climate Change
There are no direct implications arising from the recommendations in this
report.
___________________________________________________________________ 
Author: Christine McCourt, Head of Finance and Procurement
christine.mccourt@renfrewshire.gov.uk 
Page 12 of 392

Page 13

OFFICIAL-SENSITIVE 
azets.co.uk
2025/26 Annual Audit Report to the Council and the
Controller of Audit
September 2026
azets.co.uk
Renfrewshire Council
Page 13 of 392

Page 14

Renfrewshire Council: 2025/26 Annual
Audit Report to the Council and the
Controller of Audit |   Azets 
Page 2 of 106 
Table of Contents 
Key messages 3
Introduction 13
Financial statements audit 15
Wider scope of public audit 45
Best Value 73
Appendices 78
This report is for the benefit of the
Council and is made available to the
Controller of Audit for Scotland and
Audit Scotland. This report has not been
designed to be of benefit to anyone
except for the Council, the Controller of
Audit for Scotland and Audit Scotland.  It
should not be quoted in whole or in part
without our prior written consent and
should not be relied upon by third
parties. No responsibility is assumed by
Azets Audit Services to any third parties.
We do not accept any responsibility for
any loss occasioned to any third party
acting, or refraining from acting, on the
basis of the content of this report, as
this report was not prepared for, nor
intended for, any other purpose.
Page 14 of 392

Page 15

Renfrewshire Council: 2025/26 Annual Audit Report to the Council and the
Controller of Audit
|   Azets 
Page 3 of 106                                                                                                               www.azets.co.uk 
Key messages
This report concludes our audit of Renfrewshire Council (“the Council”) and its Group for the
year ended 31 March 2026. This section summarises the key findings and conclusions from
our audit.
Financial statements audit
Audit opinion
The annual accounts are to be considered and approved by the
full Council on 24 September 2026.
We expect to issue an unqualified opinion subject to
completion of the work outlined below.
Our audit work is ongoing but there are currently no matters
which would require modification of our audit report, subject
to the outstanding matters detailed below:
•   Resolution of enquiries with management relating to: 
- Debtors: Council tax debtor reconciliation 
- Asset valuation: follow up queries
- Movement in reserve statement: follow up queries
- Common good funds: sample evidence 
- Council Tax Account:  follow up queries 
•   Resolution of enquiries with third parties relating to: 
- Defined benefit pension testing: Pending receipt of the
pension fund’s assurance letter from Strathclyde
Pension Fund’s auditor in relation to Renfrewshire
Council and Renfrewshire Leisure Ltd
- Group testing: Renfrewshire Leisure Ltd expenditure
testing from the component’s auditor
- PPE revaluation: receipt of responses made to the
internal valuer
•   Completion of work that is in progress where evidence has
been received:
- Consolidation and group reporting 
- Housing Revenue Account
- Interest and other finance expenses (relating to service
concession arrangement)
Page 15 of 392

Page 16

Renfrewshire Council: 2025/26 Annual Audit Report to the Council and the
Controller of Audit
|   Azets 
Page 4 of 106                                                                                                               www.azets.co.uk 
- Service concession arrangements 
- Expenditure and funding analysis 
- Agency services 
•   At the completion stages of the audit, we are required to
undertake the following procedures:
- Engagement manager and engagement lead review of
the file and evidence therein
- Receipt and review of the signed management
representation letter
- Review of the final amended signed statement of
accounts and annual report
- Response from management regarding subsequent
events up to the date of the opinion
Audit approach
Our audit approach has been based on gaining an
understanding of the Council’s control environment and has
been risk based. This included:
• An evaluation of the internal control environment,
including the IT systems and controls; and
• Substantive testing on significant transactions and material
account balances, including the procedures outlined in this
report in relation to our significant audit risks.
On receipt of the unaudited accounts, we have clarified our
audit approach as follows:
• to apply a medium risk to the pay expenditure as this is the
first year payroll reconciliations are undertaken for payroll
accounts there is a likelihood that payroll included in the
financial statements is either not complete or accurate.
Key audit findings
The Council has administrative processes in place to prepare
the annual accounts and supporting working papers. We
received the working papers to support the annual accounts in
a timely manner. 
We obtained adequate evidence in relation to the significant
audit risks identified in our audit plan. 
Page 16 of 392

Page 17

Renfrewshire Council: 2025/26 Annual Audit Report to the Council and the
Controller of Audit
|   Azets 
Page 5 of 106                                                                                                               www.azets.co.uk 
Subject to the outstanding matters outlined on page 3-5 of this
report: 
The accounting policies used to prepare the financial
statements are considered appropriate. We are satisfied with
the appropriateness of the accounting estimates and
judgements used in the preparation of the financial
statements. All material disclosures required by relevant
legislation and applicable accounting standards have been
made appropriately.
Audit adjustments
Three audit adjustments have been identified and made
through the course of the audit. 
No unadjusted misstatements were identified within the
financial statements.
Details of the adjusted misstatements and disclosure changes
are included at Appendix 2.
Internal controls
The purpose of the audit was for us to express an opinion on
the Council’s financial statements. The audit included
consideration of internal controls relevant to the preparation
of the financial statements in order to design audit procedures
that are appropriate in the circumstances, but not for the
purpose of expressing an opinion on the effectiveness of
internal control.
Our audit is, therefore, not designed to identify all control
weaknesses.
No material weaknesses or significant deficiencies were noted
in the Council’s internal controls during our audit. 
Page 17 of 392

Page 18

Renfrewshire Council: 2025/26 Annual Audit Report to the Council and the
Controller of Audit
|   Azets 
Page 6 of 106                                                                                                               www.azets.co.uk 
Wider scope of public audit
Financial Management
Financial management is
concerned with financial
capacity, sound budgetary
processes and whether
the control environment
and internal controls are
operating effectively.
Auditor judgement
Risks exist to the achievement of operational
objectives  
Like all local authorities, financial management continues to
remain challenging in the current funding and post-pandemic
environment. 
The Council reported a small General Fund underspend of
£0.2m (0.03% of budget) in 2025/26. Financial pressures from
waste management, inflation, building repairs, social care and
school staffing were largely offset by higher investment
income, additional government funding and lower borrowing
costs. 
Financial performance across services was mixed. A number of
services recorded underspends and Adult Social Care reported
a £5.7m deficit outturn, funded from Renfrewshire Health and
Social Care Partnership (HSCP) reserves and therefore not
impacting the General Fund.
The Council's financial position remains resilient, with General
Fund reserves of £159.4m, including £11.5m of unallocated
reserves, above the approved minimum level of £10m. Council
Tax collection improved slightly to 94.7%, although this
remained below the 95% target. HRA reserves also increased
from £6.9m to £7.9m.
Capital expenditure remained within approved limits but was
lower than planned, with spend of £44m (78%) against the
housing programme budget and £111m (86%) against the
General Fund capital programme. Delays arising from
contractor availability, project complexity resulted in projects
being reprofiled, although key education projects remained on
track.
Internal controls, governance and fraud prevention
arrangements were assessed as effective, with no significant
weaknesses identified. Participation in the National Fraud
Y
Page 18 of 392

Page 19

Renfrewshire Council: 2025/26 Annual Audit Report to the Council and the
Controller of Audit
|   Azets 
Page 7 of 106                                                                                                               www.azets.co.uk 
Initiative also identified notional savings and recoveries
exceeding £1.6m. 
Financial Sustainability
Financial sustainability
looks forward to the
medium and longer term
to consider whether the
Council is planning
effectively to continue to
deliver its services and the
way in which they should
be delivered.
Auditor judgement
Risks exist to the achievement of operational
objectives 
The Council continues to face a challenging financial
environment, with ongoing inflationary pressures, rising
service demand and uncertainty over future local government
funding. Although government funding increased during
2025/26 and 2026/27, these increases largely support existing
commitments and are not sufficient to fully offset growing
cost pressures.
To improve financial resilience, the Council has maintained a
prudent reserves strategy, with unallocated reserves
remaining above the minimum approved level and the
Financial Sustainability Fund increasing from £21.2m to
£35.8m. These reserves provide flexibility to manage budget
pressures and support financial stability while longer-term
solutions are developed.
Despite this, the Council's Medium-Term Financial Plan
projects a significant funding gap of around £80m by 2030/31
before council tax decisions. Planned council tax increases and
savings programmes will reduce this gap, but substantial
service transformation, efficiencies and income generation
measures will still be required to maintain a balanced and
sustainable budget.
On 26 February 2026, the Council approved a 7.5% council tax
increase for 2026/27. Although a £6.3 million savings target
had been set for 2026/27, only £2.8 million of recurring
savings were included in the approved budget, as the
remaining savings proposals required more time and certainty
before implementation.
Y
Y
Page 19 of 392

Page 20

Renfrewshire Council: 2025/26 Annual Audit Report to the Council and the
Controller of Audit
|   Azets 
Page 8 of 106                                                                                                               www.azets.co.uk 
A key risk remains the financial position of the HSCP, which is
forecasting a budget gap of £5.1m in 2026/27. Continued
reliance on reserves is reducing the Partnership's financial
resilience and may create future funding pressures for the
Council as a partner organisation.
The Council's financial outlook is also sensitive to several
uncertainties, including future pay settlements, government
funding levels, increasing costs associated with social care,
education, transport and net zero commitments, and growing
service demand. As staffing costs represent the largest area of
expenditure, even small increases in pay awards can have a
significant financial impact.
Financial sustainability therefore remains a significant
strategic risk. While the Council has strengthened its reserves
position and achieved a balanced budget for 2026/27,
continued focus on long-term financial planning, delivery of
savings and transformation programmes, and careful
management of both revenue and capital resources will be
essential to maintaining sustainable services. 
Vision, Leadership and
Governance 
Vision, Leadership and
Governance is concerned
with the effectiveness of
scrutiny and governance
arrangements, leadership
and decision making, and
transparent reporting of
financial and performance
information.
Auditor judgement
Effective and appropriate arrangements are in
place  
The Council has a clear strategic vision through its updated
Council Plan and Community Plan, which support the vision of
"Creating a fairer Renfrewshire built on innovation, wellbeing
and opportunity". The plans set out clear priorities and
outcomes focused on Place, Economy, Fairness, Environment
and Organisational Values, providing a framework for service
delivery and performance monitoring.
The Council has effective governance arrangements in place,
supported by a Local Code of Corporate Governance, clearly
defined committee structures and strong scrutiny
arrangements. 
G
Page 20 of 392

Page 21

Renfrewshire Council: 2025/26 Annual Audit Report to the Council and the
Controller of Audit
|   Azets 
Page 9 of 106                                                                                                               www.azets.co.uk 
During 2025/26, the Council strengthened its performance
management framework through the introduction of a
dedicated officer Performance Board tasked with driving
improvements to targeted areas of corporate performance.
Risk management arrangements continue to operate
effectively. Counter-fraud and whistleblowing arrangements
were also updated during the year to reflect legislative
changes and support good governance.
Internal audit provided a reasonable assurance opinion on the
adequacy and effectiveness of the Council's governance, risk
management and internal control arrangements. 
Overall, effective and appropriate arrangements are in place
for vision, leadership and governance, supporting the
Council's ability to deliver its strategic objectives and manage
risks effectively. 
Use of Resources to
Improve Outcomes
Audited bodies need to
make best use of their
resources to meet stated
outcomes and
improvement objectives,
through effective planning
and working with
strategic partners and
communities. This
includes demonstrating
economy, efficiency, and
effectiveness through the
use of financial and other
resources and reporting
performance against
outcomes.
Auditor judgement
Risks exist to the achievement of operational
objectives  
The Council has a well-established performance management
framework that links strategic priorities in the Council Plan to
service-level improvement plans and operational performance
monitoring. Performance is regularly reviewed through
leadership and management structures, with reporting to
Boards and the Corporate Management Team to support
oversight and continuous improvement.
Performance against the Local Government Benchmarking
Framework (LGBF) 2024/25 was generally positive, with 57%
of indicators showing improved or maintained performance.
Longer-term trends show that improvements in 79% of all
measures since the LGBF began, this is a higher proportion
than any of the Council’s Family Group comparator councils.
The Council performs strongly in areas including educational
attainment, road condition, housing performance, delayed
Y
Y
Y
Page 21 of 392

Page 22

Renfrewshire Council: 2025/26 Annual Audit Report to the Council and the
Controller of Audit
|   Azets 
Page 10 of 106                                                                                                              
www.azets.co.uk 
hospital discharges and carbon emissions. However,
performance remains comparatively weaker in some areas,
including school exclusions, customer satisfaction with street
cleaning and refuse collection, council tax collection and crisis
grant processing. These present opportunities for further
improvement. 
The Council also demonstrates a consistent commitment to
improving outcomes through its focus on fairness, equality
and inclusion. Governance arrangements, community
engagement, workforce development and targeted
programmes are well embedded. We have performed a
consideration of the fairness and equality theme during the
2025/26 audit. Overall, we concluded that the Council has
appropriate arrangements within this area. Fairness and
equality are embedded across the Council’s strategic planning,
governance, workforce policies and service delivery,
supported by strong leadership and effective oversight
arrangements. The Council has also demonstrated continued
progress in strengthening its equality framework and
improving outcomes for communities and individuals who
experience inequality or disadvantage.
Best Value 
Definitions
We use the following gradings to provide an overall assessment of the arrangements in place
as they relate to the wider scope areas and reporting our findings on Best Value. The text
provides a guide to the key criteria we use in the assessment, although not all of the criteria
may exist in every case.
Page 22 of 392

Page 23

Renfrewshire Council: 2025/26 Annual Audit Report to the Council and the
Controller of Audit
|   Azets 
Page 11 of 106                                                                                                              
www.azets.co.uk 
Best Value 
Auditor judgement
Effective and appropriate arrangement to secure Best Value
are in place.  The council have made progress in addressing
recommendations raised from our previous work on Best
Value thematic reviews. The newest review on assets
management identified a number of low risk rating
recommendations which are being addressed by the
council. 
Effectiveness of
performance
reporting
The council has appropriate arrangements in place in relation to 
performance reporting. 
Thematic
review: Asset
Management
The council has appropriate strategies and capital programmes
documents in place supported by strong governance structures. The
council is able to deliver major complex capital projects despite the
external pressures. The council works effectively with partners and
communities to deliver its projects. Some scope for improvement exists
in relation to the delivery of non-housing projects and reporting on
outcomes. 
G
Page 23 of 392

Page 24

Renfrewshire Council: 2025/26 Annual Audit Report to the Council and the
Controller of Audit
|   Azets 
Page 12 of 106                                                                                                              
www.azets.co.uk 
There is a fundamental absence or failure of arrangements
There is no evidence to support necessary improvement
Substantial unmitigated risks affect achievement of corporate objectives.
Arrangements are inadequate or ineffective
Pace and depth of improvement is slow / needs to extend further
Significant unmitigated risks affect the achievement of corporate
objectives
No major weaknesses in arrangements but scope for
improvement exists
Pace and depth of improvement are adequate
Risks exist to the achievement of operational objectives
Effective and appropriate arrangements are in place
Pace and depth of improvement are effective
Risks to the achievement of objectives are managed
R
O
Y
G
Page 24 of 392

Page 25

Renfrewshire Council: 2025/26 Annual Audit Report to the Council and the
Controller of Audit
|   Azets 
Page 13 of 106                                                                                                              
www.azets.co.uk 
Introduction
Scope of audit 
The annual external audit comprises:
• the audit of the financial statements and other reports included in the Council’s
annual accounts, and
• completion of the wider-scope audit and Best Value audit responsibilities set out in
Audit Scotland’s Code of Audit Practice.
We outlined the scope of our audit in our 2025/26 External Audit Plan, which we presented
to the Audit, Risk and Scrutiny Board at the outset of our audit.
This Annual Audit Report is designed to summarise the key findings and conclusions from our
audit work. It is addressed to both the Council and the Controller of Audit for Scotland and
presented to those charged with governance. 
Responsibilities
The Council is responsible for preparing its annual accounts, including financial statements,
which show a true and fair view of the results for the year and position at the year end, and
for implementing appropriate internal control systems. 
We are responsible for carrying out the audit of the annual accounts in line with the
requirements set out in the Code of Audit Practice issued by Audit Scotland. Our audit is
directed towards forming and expressing an opinion on the financial statements that have
been prepared by management with the oversight of the Audit, Risk and Scrutiny Board.
Under the Code of Audit Practice, we are also required to consider the Council’s wider scope
and Best Value arrangements and to report on our findings. However, our audit is not
designed to test all internal controls or identify all areas of control weakness. As such, our
work cannot be relied upon to disclose all errors or other irregularities, or to include all
possible improvements in internal control that a more extensive examination might identify. 
The weaknesses or risks identified in this report are only those that have come to our
attention during our normal audit work. Communication in this report of matters arising from
the audit or of risks or weaknesses does not absolve management from its responsibility to
address the issues raised and to maintain an adequate system of control.
The primary responsibility for the prevention and detection of fraud rests with management
and those charged with governance, including establishing and maintaining internal controls
over the reliability of financial reporting, effectiveness and efficiency of operations and
Page 25 of 392

Page 26

Renfrewshire Council: 2025/26 Annual Audit Report to the Council and the
Controller of Audit
|   Azets 
Page 14 of 106                                                                                                              
www.azets.co.uk 
compliance with applicable laws and regulations. As auditors, we obtain reasonable, but not
absolute, assurance that the financial statements, as a whole, are free from material
misstatement, whether caused by fraud or error.
We would like to thank all management and staff for their co-operation and assistance during
our audit.
Auditor independence
International Standards on Auditing in the UK (ISAs (UK)) require us to communicate on a
timely basis all facts and matters that may have a bearing on our independence.
We confirm that we complied with the Financial Reporting Council’s (FRC) Ethical Standard. In
our professional judgement, we remained independent, and our objectivity has not been
compromised in any way.
We set out in Appendix 1 our assessment and confirmation of independence. 
Adding value
All of our clients quite rightly demand of us a positive contribution to meeting their ever-
changing business needs. We add value by being constructive and forward looking, by
identifying areas of improvement and by recommending and encouraging good practice. In
this way we aim to promote improved standards of governance, better management and
decision making and more effective use of public money.
Any comments you may have on the service we provide would be greatly appreciated.
Comments can be reported directly to any member of your audit team or to Audit Scotland.
Openness and transparency
This report will be published on Audit Scotland’s website www.audit-scotland.gov.uk. 
Page 26 of 392

Page 27

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 15 of 106                                                                                                              
www.azets.co.uk 
Financial statements audit
Under International Standards on Auditing (UK) and the Code of Audit Practice on Local
Authority Accounting in the United Kingdom 2025/26, we are required to report whether, in
our opinion:
• The financial statements give a true and fair view of the Council and Group’s financial
position and income and expenditure for the period
• The financial statements have been properly prepared in accordance with the Code of
Practice on Local Authority Accounting in the UK 2025/26 (the 2025/26 Code), the
requirements of the Local Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland Act 2003
• The audited parts of the Remuneration Report have been properly prepared in
accordance with The Local Authority Accounts (Scotland) Regulations 2014
• The information given in the Management Commentary is consistent with the financial
statements and that report has been prepared in accordance with statutory guidance
issued under the Local Government in Scotland Act 2003
• The information given in the Annual Governance Statement is consistent with the
financial statements and that report has been prepared in accordance with the Delivering
Good Governance in Local Government Framework (2016).
We are also required to report on whether the other information included in the annual
accounts (including the Management Commentary and Annual Governance Statement) is
materially consistent with the financial statements or our knowledge obtained in the audit or
otherwise appears to be materially misstated.
Our audit opinion
Opinion Basis for opinion Conclusions
Financial statements We conduct our audit in
accordance with applicable
law and International
Standards on Auditing.
Our findings / conclusions to
inform our opinion are set
out in this section of our
annual audit report.
The Council’s annual accounts are
due to be considered by the
Council and approved for
signature on 24 September 2026. 
Subject to the outstanding
matters outlined on page 3-5 of
this report, we anticipate issuing
unqualified audit opinions.
Pending completion of the work
set out earlier in this report there
Page 27 of 392

Page 28

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 16 of 106                                                                                                              
www.azets.co.uk 
Opinion Basis for opinion Conclusions
are currently no matters which
would require modification of our
audit report.
Going concern basis of
accounting
When assessing whether
the going concern basis of
accounting is appropriate,
the anticipated provision of
services is more relevant to
the assessment than the
continued existence of a
particular public body.
We assess whether there
are plans to discontinue or
privatise the Council’s
functions.
Our wider scope audit work
considers the financial
sustainability of the Council.
Our understanding of the
Council’s legislative framework
and activities provides us with
sufficient assurance that the
Council will have continued
provision of service for at least 12
months from the date of signing
of our audit opinion. Subject to
the outstanding matters outlined
on pages 3-5 of this report, we
expect that our audit opinion will
be unmodified in this respect.
Other information:
Comprises the Annual
Governance Statement
and the Management
Commentary, excluding
the audited parts of the
Remuneration Report.
Our opinion on the
financial statements
does not cover the
other information and
we do not express any
form of assurance
conclusion thereon
except to the extent
We are required to consider
whether the other
information is materially
inconsistent with the
financial statements or with
other knowledge obtained
during the audit or
otherwise appears
materially misstated. 
Subject to the outstanding
matters outlined on pages 3-5 of
this report, we currently have
nothing to report in this regard.
Page 28 of 392

Page 29

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 17 of 106                                                                                                              
www.azets.co.uk 
Opinion Basis for opinion Conclusions
explicitly stated in the
opinions prescribed by
the Accounts
Commission.
Opinions prescribed by
the Accounts
Commission:
• The audited parts of
the Remuneration
Report
• Management
Commentary
• Annual Governance
Statement
We plan and perform audit
procedures to gain
assurance that the audited
parts of the Remuneration
Report, Management
Commentary and Annual
Governance Statement and
are prepared in accordance
with relevant legislation and
guidance.
Subject to the outstanding
matters outlined on pages 3-5 of
this report, we expect to
conclude that:
• the audited parts of the
Remuneration Report have
been properly prepared; 
• the information given in the
Management Commentary is
consistent with the financial
statements and has been
properly prepared;
• the information given in the
Annual Governance
Statement is consistent with
the financial statements, has
been prepared in accordance
with the Delivering Good
Governance in Local
Government Framework
(2016) and is consistent with
our understanding of the
Council gained through our
audit.
Page 29 of 392

Page 30

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 18 of 106                                                                                                              
www.azets.co.uk 
Opinion Basis for opinion Conclusions
Matters reported by
exception
We are required to report
on whether:
• adequate accounting
records have not been
kept; or
• the financial statements
and the audited parts of
the Remuneration
Report are not in
agreement with the
accounting records; or
• we have not received all
the information and
explanations we require
for our audit.
We have no matters to report. 
An overview of the scope of our audit
The scope of our audit was detailed in our External Audit Plan, which was presented to the
Audit, Risk and Scrutiny Board in March 2026. The plan explained that we follow a risk-based
approach to audit planning that reflects our overall assessment of the relevant risks that
apply to the Council and Group.  This ensures that our audit focuses on the areas of highest
risk (the significant risk areas). Planning is a continuous process, and our audit plan is subject
to review during the course of the audit to take account of developments that arise.
We carried out a further review of our risk assessment following receipt of the unaudited
annual report and accounts. Our risk assessment was then updated to clarify our audit
approach as follows:
• to apply a medium  risk to the pay expenditure as this is the first year payroll
reconciliations are undertaken for payroll accounts there is a likelihood that
payroll included in the financial statements is either not complete or accurate.
In our audit, we test and examine information using sampling and other audit techniques, to
the extent we consider necessary to provide a reasonable basis for us to draw conclusions.
This includes:
Page 30 of 392

Page 31

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 19 of 106                                                                                                              
www.azets.co.uk 
• An evaluation of the Council and Group’s internal control environment, including the IT
systems and controls; and
• Substantive testing on significant transactions and material account balances, including
procedures outlined in this report in relation to our key audit risks.
Quality indicators
We have applied a suite of quality indicators to assess the reliability of the Council’s financial
reporting and response to the audit.  We have highlighted any significant difficulties we have
encountered during the audit, as required by auditing standards.
Metric Grading (Mature /
developing /
significant
improvement
required)
Commentary
Quality and timeliness of
draft financial statements
Mature We received the unaudited financial
statements in line with our agreed audit
timetable. The financial statements were
of a good standard. Revisions were
provided promptly where required.
Quality of working papers
provided and adherence to
timetable
Developing We received supporting working papers
in line with our audit timetable. 
The majority of these were of a good
standard, and we have observed
improvements across many areas
compared with the prior year. There are
however still some specific areas
remaining where further enhancement
of working papers is required to support
our testing procedures including debtor
and creditor listings. 
Details of the recommendation are
included at Appendix 4. 
Page 31 of 392

Page 32

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 20 of 106                                                                                                              
www.azets.co.uk 
Metric Grading (Mature /
developing /
significant
improvement
required)
Commentary
Timing and quality of key
accounting judgements
Mature Pending completion of our work as set
out on pages 3-5, we did not identify any
issues with the timing and quality of key
accounting judgements.
Access to finance team
and other key personnel
Mature/
Developing
We received full access to the finance
team and other key personnel
throughout the audit. 
The Finance team and other key
personnel were available as agreed. A
meeting with management’s experts
(actuary and valuer) were arranged in
advance and their engagement was
helpful to the audit.
However, some key personnel outside of
the Finance team were not always able
to promptly respond to requests and
inquiries.
Finance management was cooperative
and supportive throughout the audit
process, helping to maintain progress
against the agreed timetable. Increased
engagement during the year, including
regular catch-up meetings and follow-up
on outstanding matters, contributed to
the efficient progression of the audit.
Page 32 of 392

Page 33

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 21 of 106                                                                                                              
www.azets.co.uk 
Metric Grading (Mature /
developing /
significant
improvement
required)
Commentary
Quality and timeliness of
the:
• Remuneration Report
• Management
Commentary
• Annual Governance
Statement
As well as the quality and
timeliness of supporting
working papers for those
statements.
Mature We received the Remuneration Report
Management Commentary and Annual
Governance Statement in line with
agreed timescales.
The reports were all produced in line
with mandated requirements.
Volume and magnitude of
identified errors
Mature Pending completion of our work as set
out on pages 3-5, we identified three
adjusted misstatements on audit. We
also identified some disclosure changes.
Further details are set out in Appendix 2.
There were no unadjusted
misstatements. 
Significant risk areas and key audit matters
Significant risks are defined by auditing standards as risks that, in the judgement of the
auditor, require special audit consideration. In identifying risks, we consider the nature of the
risk, the potential magnitude of misstatement, and its likelihood. Significant risks are those
risks that have a higher risk of material misstatement. Audit procedures are designed to
mitigate these risks.
As required by the Code of Audit Practice and the planning guidance issued by Audit
Scotland, we considered the significant risks for the audit that had the greatest effect on our
audit strategy, the allocation of resources in the audit and directing the efforts of the audit
Page 33 of 392

Page 34

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 22 of 106                                                                                                              
www.azets.co.uk 
team. These were defined as the ‘Key Audit Matters’ for the audit, as detailed in the tables
below. 
Our audit procedures relating to these matters were designed in the context of our audit of
the annual accounts as a whole, and not to express an opinion on individual balances,
transactions or disclosures.
Subject to the outstanding matters outlined on pages 3-5 of this report, we do not expect to
modify our opinion on the Council’s annual accounts with respect to any of the risks
described below.
The table below summarises each significant risk and whether it reflects a fraud risk and/or
Key Audit Matter. Detail behind each risk and the work undertaken is set out on the following
pages.
Risk area  Financial
statement
/ Assertion
level risk
Fraud
risk
Key Audit
Matter
Risk of
material
misstatement
Outcome of work
Management
override of
controls
Financial
statement
Yes Yes Very High
Subject to the outstanding
matters outlined on pages
3-5 of this report, we found
no evidence of fraud or
error through management
override of controls.
Fraud in revenue
recognition
(Rebutted)
Assertion
level
No No Low
Subject to the outstanding
matters outlined on pages
3-5 of this report, we have
not identified any material
issues in relation to this risk.
Fraud in
expenditure
recognition
(Rebutted)
Assertion
level
No No Low
Subject to the outstanding
matters outlined on pages
3-5 of this report, we have
not identified any material
issues in relation to this risk.
Valuation of other
land and buildings
Assertion
Level
No Yes High
Subject to the outstanding
matters outlined on pages
3-5 of this report, we have
Page 34 of 392

Page 35

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 23 of 106                                                                                                              
www.azets.co.uk 
Risk area  Financial
statement
/ Assertion
level risk
Fraud
risk
Key Audit
Matter
Risk of
material
misstatement
Outcome of work
not identified any material
issues in the valuation of
council dwellings or other
land and buildings.
Valuation of
council dwellings 
Assertion
Level No Yes High
Subject to the outstanding
matters outlined on pages
3-5 of this report, we have
not identified any material
errors in the valuation of
council dwellings or other
land and buildings.
Valuation of
defined benefit
pension fund
asset/liability
Assertion
Level
No Yes High
Subject to the outstanding
matters outlined on pages
3-5 of this report, we have
not identified any material
errors in the pension
liability. 
Significant risks at the financial statement level
These risks are considered to have a pervasive impact on the financial statements as a whole
and potentially affect many assertions for classes of transaction, account balances and
disclosures.
Risk area Management override of controls (Council and Group)
Significant risk
description
Auditing Standards require auditors to treat management
override of controls as a significant risk on all audits. This is
because management is in a unique position to perpetrate fraud
by manipulating accounting records and overriding controls that
otherwise appear to be operating effectively.  
Page 35 of 392

Page 36

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 24 of 106                                                                                                              
www.azets.co.uk 
Risk area Management override of controls (Council and Group)
Although the level of risk will vary from entity to entity, this risk
is nevertheless present in all entities. 
Specific areas of potential risk include manual journals,
management estimates and judgements and one-off
transactions outside the ordinary course of the business.
This was considered to be a significant risk and Key Audit Matter
for the audit.
Risk of material misstatement: Very High
How the scope of our
audit responded to the
significant risk
Key judgement
There is the potential for management to use their judgement to
influence the financial statements as well as the potential to
override controls for specific transactions. 
Audit procedures
• Documented our understanding of the journals posting
process at the Council and evaluated the design
effectiveness of management controls over journals;
• Analysed the journals listing for the year and determined the
criteria for selecting high risk and/or unusual journals;
• Tested high risk and/or unusual journals posted during the
year and after the draft accounts stage back to supporting
documentation for appropriateness and corroboration and
to ensure approval had been undertaken in line with the
Council’s journals policy;
• Gained an understanding of the key accounting estimates
and critical judgements made by management. We
challenged key assumptions and considered for
reasonableness and evaluated any indicators of bias which
could result in material misstatement due to fraud; and
• Evaluated the rationale for any changes made to accounting
policies, estimates or significant unusual transactions.
Key observations Subject to the outstanding matters outlined on pages 3-5 of this
report we have not identified any indication of management
override of controls in the year. 
Page 36 of 392

Page 37

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 25 of 106                                                                                                              
www.azets.co.uk 
Risk area Management override of controls (Council and Group)
In line with the prior year, we identified from our journals
testing undertaken that large batch journals with over 50 lines
require no system approval. We have therefore carried forward
a control recommendation in relation to the authorisation and
review process of large journals. Details of the recommendation
are outlined at Appendix 4. 
Page 37 of 392

Page 38

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 26 of 106                                                                                                              
www.azets.co.uk 
Significant risks at the assertion level for classes of transaction,
account balances and disclosures
Key risk area Fraud in revenue recognition – Rebutted (Council and Group)
Risk description
Material misstatement due to fraudulent financial reporting
relating to revenue recognition is a presumed risk in ISA (UK) 240. 
The presumption is that the Council could adopt accounting
policies or recognise income in such a way as to lead to a material
misstatement in the reported financial position. 
Having considered the nature of the revenue streams at the
Council, we consider that the risk of fraud in revenue recognition
can be rebutted due to the following:
•   There is little incentive to manipulate revenue recognition;
•   Opportunities to manipulate revenue recognition are very
limited;
•   The culture and ethical frameworks of local authorities mean
that all forms of fraud are seen as unacceptable.
Therefore, we do not consider this to be a significant risk for the
Council and group.
Inherent risk of material misstatement: 
Revenue  (occurrence): Low
How the scope of
our audit responded
to the risk
Key judgements
We have rebutted this risk as we have assessed there is low
incentive or opportunity to manipulate revenue streams of the
Council and Group.
Audit procedures
• We have performed standard audit procedures on these
material transactions and balances.
Key observations
Subject to the outstanding matters outlined on pages 3-5 of this
report, we have not identified any material issues in relation to this
risk. 
Page 38 of 392

Page 39

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 27 of 106                                                                                                              
www.azets.co.uk 
Key risk area Fraud in non-pay expenditure recognition – Rebutted (Council and
Group)
Risk description
Practice Note 10 The Audit of Public Sector Financial Statements
notes that for certain public bodies, the risk of manipulating
expenditure could exceed the risk of the manipulation of revenue.
We have therefore also considered the risk of fraud in expenditure
at the Council. 
We have considered the risk of fraud in expenditure at the Council
for all expenditure streams and concluded that there is not a
significant risk. This is due to the low fraud risk in the underlying
nature of the transactions, the high predictability of certain
expenditure streams, such as payroll or interest, or the immaterial
nature of the expenditure streams both individually and
collectively.
Our consideration of expenditure streams also included capital
expenditure and similarly we concluded that there is not a
significant risk. Capital expenditure transactions are likely to be
larger and subject to more scrutiny, reducing the risk of improper
recognition.
Inherent risk of material misstatement: 
Expenditure (completeness): Low
Accruals (completeness): Low
How the scope of
our audit responded
to the risk
Key judgements
We have rebutted this risk as we have assessed there is low fraud
risk in the underlying nature of the transactions, the high
predictability of certain expenditure streams, such as payroll or
interest, or the immaterial nature of the expenditure streams both
individually and collectively.
Audit procedures
• We have performed standard audit procedures on these
material transactions and balances.
Key observations Subject to the outstanding matters outlined on pages 3-5 of this
report, we have not identified any material issues in relation to this
risk. 
Page 39 of 392

Page 40

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 28 of 106                                                                                                              
www.azets.co.uk 
Key risk area Fraud in non-pay expenditure recognition – Rebutted (Council and
Group)
Key risk area Valuation of other land and buildings (key accounting estimate)
(Council and Group)
Significant risk
description
Revaluation of the Council’s operational land and buildings should
be performed in line with the revised revaluation requirements for
2025/26 onwards set out in the Code of Practice on Local Authority
Accounting in the UK (the CIPFA Code). 
The Council has adopted the following approach to its land and
buildings valuations for 2025/26 onwards: rolling five-year
programme with use of indexation in intervening years, to ensure
compliance with the revised requirements set out in the CIPFA
Code.
Management has an internal team of qualified valuers and engage
the services of an external qualified valuer, who are Regulated
Members of the Royal Institute of Chartered Surveyors (RICS) to
undertake these valuations as of 31 March 2026. The Council  have
also engaged further experts to support on the provision of
appropriate indices for land and buildings, to ensure compliance
with the CIPFA Code requirements. 
The valuations and index uplifts involve a wide range of
assumptions and source data and are therefore sensitive to
changes in market conditions. ISAs (UK) 500 and 540 require us to
undertake audit procedures on the use of management’s valuation
experts and the methods, assumptions and source data underlying
the fair value estimates. 
This represents a key accounting estimate made by management
within the financial statements due to the size of the values
involved, the subjectivity of the measurements and the sensitive
nature of the estimate to changes in key assumptions. We have
therefore identified the valuation of other land and buildings as a
significant risk. 
We further pinpoint this risk to specific assets, or asset types, on
receipt of the draft financial statements and the year-end updated
Page 40 of 392

Page 41

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 29 of 106                                                                                                              
www.azets.co.uk 
Key risk area Fraud in non-pay expenditure recognition – Rebutted (Council and
Group)
asset valuations to those assets where the in-year valuation
movements falls outside of our expectations, there are significant
changes to any of the key assumptions or the year-end valuation is
considered material.
This was considered to be a significant risk and Key Audit Matter for
the audit.
Inherent risk of material misstatement: 
Other land and buildings (valuation): High
How the scope of
our audit responded
to the significant risk
Key judgements
Councils are required to revalue property, plant and equipment
with sufficient regularity to ensure that the carrying amount does
not differ materially from the current value at 31 March.
Audit procedures
• Evaluated management processes, controls and assumptions
for the calculation of the estimates, the instructions issued to
the valuation experts and the scope of their work;
• Evaluated the competence, capabilities and objectivity of the
valuation expert;
• Considered the basis on which the valuations and indexation
uplifts were carried out and challenged the key assumptions
applied;
• Evaluated the reasonableness of the valuation movements for
any assets revalued during the year, with reference to market
data;
• For any unusual or unexpected valuation movements, tested
the information used by the valuer to ensure it is complete and
consistent with our understanding;
• Ensured revaluations made during the year have been input
correctly to the fixed asset register and the accounting
treatment within the financial statements is correct;
Page 41 of 392

Page 42

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 30 of 106                                                                                                              
www.azets.co.uk 
Key risk area Fraud in non-pay expenditure recognition – Rebutted (Council and
Group)
• Evaluated the assumptions made by management for any
assets not revalued during the year and how management are
satisfied that these are not materially misstated;
• Engaged our own valuations expert, where necessary, to assess
any judgmental assumptions used that underpinned the final
valuations.
Key observations Subject to the outstanding matters outlined on pages 3-5 of this
report, we have not identified any material issues in relation to this
risk. 
Key risk area Valuation of council dwellings  (key accounting estimate) (Council
and Group)
Significant risk
description
Revaluation of the Council’s council dwellings should be performed
in line with the revised revaluation requirements for 2025/26
onwards set out in the Code of Practice on Local Authority
Accounting in the UK (the CIPFA Code). 
Revaluation of council dwellings should be performed with
sufficient regularity so that carrying amounts are not materially
misstated. The Council values the full portfolio of council dwellings
every 5 years with an annual review completed in intervening years
to advise whether there has been a change in the value of housing
stock since the last full revaluation. A full revaluation of council
dwellings was undertaken during the 2025/26 financial year.
Management engage the services of a qualified valuer, who is a
Regulated Member of the Royal Institute of Chartered Surveyors
(RICS) to undertake these valuations as of 31 March 2026. 
The valuations involve a wide range of assumptions and source
data and are therefore sensitive to changes in market conditions.
ISAs (UK) 500 and 540 require us to undertake audit procedures on
the use of management’s valuation experts and the methods,
assumptions and source data underlying the fair value estimates. 
This represents a key accounting estimate made by management
within the financial statements due to the size of the values
Page 42 of 392

Page 43

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 31 of 106                                                                                                              
www.azets.co.uk 
Key risk area Valuation of council dwellings  (key accounting estimate) (Council
and Group)
involved, the subjectivity of the measurements and the sensitive
nature of the estimate to changes in key assumptions. We have
therefore identified the valuation of council dwellings as a
significant risk. 
This was considered to be a significant risk and Key Audit Matter for
the audit.
Inherent risk of material misstatement: 
Council dwellings (valuation): High
How the scope of
our audit responded
to the significant risk
Key judgements
Councils are required to revalue property, plant and equipment
with sufficient regularity to ensure that the carrying amount does
not differ materially from the current value at 31 March.
Audit procedures
• Evaluated management processes, controls and assumptions
for the calculation of the estimates, the instructions issued to
the valuation experts and the scope of their work;
• Evaluated the competence, capabilities and objectivity of the
valuation expert;
• Considered the basis on which the valuations were carried out
and challenged the key assumptions applied;
• Evaluated the reasonableness of the valuation movements for
any assets revalued during the year, with reference to market
data;
• For any unusual or unexpected valuation movements, tested
the information used by the valuer to ensure it is complete and
consistent with our understanding;
• Ensured revaluations made during the year have been input
correctly to the fixed asset register and the accounting
treatment within the financial statements is correct;
• Evaluated the assumptions made by management for any
assets not revalued during the year and how management are
satisfied that these are not materially misstated;
Page 43 of 392

Page 44

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 32 of 106                                                                                                              
www.azets.co.uk 
Key risk area Valuation of council dwellings  (key accounting estimate) (Council
and Group)
• Engaged our own valuations expert, where necessary, to assess
any judgmental assumptions used that underpinned the final
valuations.
Key observations Subject to the outstanding matters outlined on page 3-5 of this
report, we have not identified any material issues in relation to this
risk. 
Key risk area Pension asset/liability (key accounting estimate) (Council and
Group)
Significant risk
description
An actuarial estimate of the net defined pension liability/asset is
calculated on an annual basis under IAS 19 ‘Employee Benefits’,
and on a triennial funding basis, by an independent firm of
actuaries with specialist knowledge and experience. The triennial
estimates are based on the most up to date membership data held
by the pension fund and a roll forward approach is used in
intervening years, as permitted by the Code of Practice on Local
Authority Accounting in the UK. 
The calculations involve a number of key assumptions, such as
discount rates and inflation and local factors such as mortality rates
and expected pay rises. The estimates are highly sensitive to
changes in these assumptions and the calculation of any asset
ceiling when determining the value of a pension asset. ISAs (UK)
500 and 540 require us to undertake audit procedures on the use
of external experts (the actuary) and the methods, assumptions
and source data underlying the estimates. 
This represents a key accounting estimate made by management
within the financial statements due to the size of the values
involved, the subjectivity of the measurement and the sensitive
nature of the estimate to changes in key assumptions. We have
therefore identified the valuation of the net pension liability/asset
as a significant risk.
This was considered to be a significant risk and Key Audit Matter for
the audit.
Page 44 of 392

Page 45

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 33 of 106                                                                                                              
www.azets.co.uk 
Key risk area Pension asset/liability (key accounting estimate) (Council and
Group)
Inherent risk of material misstatement: 
Pension (valuation): High
How the scope of
our audit responded
to the significant risk
Key judgements
Pension valuations are highly subjective and based upon actuarial
estimation.  Given the scale of these assets and liabilities, these can
be sensitive to small changes in the assumptions informing the
calculations, which increases risk of potential material error.
Audit procedures
• Evaluated management’s process for the calculation of the
estimate, the instructions issued to management’s expert (the
actuary) and the scope of their work;
• Evaluated the competence, capabilities and objectivity of the
actuary;
• Assessed the controls in place to ensure that data provided to
the actuary by the Council and their pension fund was accurate
and complete;
• Evaluated the methods, assumptions and source data used by
the actuary in their valuations, with the support of an auditors’
expert
• Tested the consistency of the pension fund asset and liability
and disclosures in the notes to the core financial statements
with the actuarial report from the actuary; 
• Evaluated whether any asset ceiling was appropriately
considered when determining the value of any pension asset
included in the financial statements; and
• Obtaining assurances from the pension fund auditor as to the
controls surrounding the validity and accuracy of membership
data; contributions data and benefits data sent to the actuary
by the pension fund and the fund assets valuation in the
pension fund financial statements; and ensured pension
valuation movement in the year and related disclosure have
been  correctly reflected in the financial statements. 
Page 45 of 392

Page 46

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 34 of 106                                                                                                              
www.azets.co.uk 
Key risk area Pension asset/liability (key accounting estimate) (Council and
Group)
Key observations Subject to the outstanding matters outlined on pages 3-5 of this
report, we have not identified any material issues in relation to this
risk. 
Other risks
This section summarises conclusions in relation to other identified risks which, although not
considered to be significant, required specific consideration during the audit, or were risks
otherwise identified during the course of the audit
Other risk area  Pay expenditure (Council and Group)
Risk description
This is the first year full payroll reconciliations were undertaken for
payroll accounts, therefore there is a risk that payroll included in
the financial statements is either not complete or accurate.
Inherent risk of material misstatement: 
Pay expenditure (Completeness & Accuracy): Medium
How the scope of
our audit responded
to the risk
Audit procedures
• Tested a sample of starters, leavers and amendments to ensure
new starters exist, leavers have left and changes in
circumstances have been processed correctly;
• Carried out a substantive analytical procedure to assess the
completeness and accuracy of pay expenditure;
• Performed a proof in total for employer social security and
employer pension contribution costs;
• Performed substantive testing of pay expenditure transaction
outside the normal payroll transaction from the payrun using
tests of detail by ensuring they can be traced to appropriate
supporting evidence.
Key observations We have not identified any material issues in relation to this risk.
Materiality
Materiality is an expression of the relative significance of a matter in the context of the
financial statements as a whole. A matter is material if its omission or misstatement would
reasonably influence the decisions of an addressee of the auditor’s report. The assessment of
Page 46 of 392

Page 47

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 35 of 106                                                                                                              
www.azets.co.uk 
what is material is a matter of professional judgement and is affected by our assessment of
the risk profile of the Council and the needs of users. We review our assessment of
materiality throughout the audit.
Whilst our audit procedures are designed to identify misstatements which are material to our
audit opinion, we also report any uncorrected misstatements of lower value errors to the
extent that our audit identifies these. 
Our initial assessment of materiality for the group financial statements was £18.1 million and
the Council’s financial statements was £18 million. On receipt of the 2025/26 unaudited
financial statements, we reassessed materiality and the initial assessment is still appropriate.
We consider that our assessment has remained appropriate throughout our audit. 
Group 
£million
Council
£million
Overall materiality for the financial statements 18.100 18.000
Performance materiality (75% of materiality) 13.575 13.500
Trivial threshold 0.905 0.900
Materiality
Our assessment is made with reference to the Group and Council’s
gross expenditure. We consider this to be the principal consideration
for users of the financial statements when assessing financial
performance.
Our assessment of materiality equates to approximately 2% of gross
expenditure as disclosed in the 2024/25 audited financial statements.
The financial statements are considered to be materially misstated
where total errors exceed this value.
Performance
materiality
Performance materiality has been set at 75% of overall materiality
(adjusted to take into account the Council’s component materiality
allocation for the group accounts). This is based on the internal control
environment of the Council and reflects our risk assessed knowledge of
the potential for errors occurring. It is intended to reduce, to an
acceptably low level, the probability that cumulative undetected and
uncorrected misstatements exceed materiality for the financial
statements as a whole.
Page 47 of 392

Page 48

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 36 of 106                                                                                                              
www.azets.co.uk 
Trivial
misstatements
Trivial misstatements are matters that are clearly inconsequential,
whether taken individually or in aggregate and whether judged by any
quantitative or qualitative criteria.
Individual errors above this threshold are communicated to those
charged with governance. 
In addition to the above, we consider any areas for specific lower materiality.
We have determined that no specific materiality levels needed to be set for this audit. 
Common Good Funds Materiality
Our initial assessment of materiality for the common good funds was £197,000 for Common
Good Fund (CGF) Paisley, £1,500 for CGF Johnstone, and £1,104,000 for CGF Renfrew. On
receipt of the 2025/26 unaudited financial statements, we reassessed materiality levels and
updated as below, with the CGF Johnstone remaining unchanged from the planning. We
consider that our assessment has remained appropriate throughout our audit. 
Overall
Materiality £
Performance
Materiality £
Trivial
Threshold £
CGF Paisley 242,000 181,500 12,100
CGF Johnstone 1,500 1,125 100
CGF Renfrew 1,174,000 880,500 58,700 
Page 48 of 392

Page 49

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 37 of 106                                                                                                              
www.azets.co.uk 
Group audit
The Council is also required to prepare group accounts. 
The Group Accounts consolidate the results of the Council with five subsidiaries:
• Renfrewshire Leisure Limited, trading as OneRen;
• the Common Good Funds;
• the Coats Observatory Trust;
• Park Lane Developments (Renfrewshire) LLP; and
• Paisley Museum Reimagined Limited.
The Group Accounts also consolidate the Council’s share of five other entities treated as
associates or joint ventures:
• Strathclyde Partnership for Transport;
• Strathclyde Concessionary Travel Scheme Joint Committee;
• Renfrewshire Valuation Joint Board;
• Renfrewshire Health and Social Care Integration Joint Board; and
• AMIDS Renfrewshire LLP.
The Council has non-material interests in a number of other entities namely Scotland Excel;
and Glasgow City Region – City Deal Cabinet. These entities have not been consolidated on
the grounds of materiality. We have reviewed managements consideration of this decision
and confirm that it is appropriate.
As group auditors under ISA (UK) 600 we are required to obtain sufficient appropriate audit
evidence regarding the financial information of the components and regarding the
consolidation process to express an opinion on whether the group financial statements are
prepared, in all material respects, in accordance with the applicable financial reporting
framework.
The significant risks identified at the Council are set out in this report. There are no additional
significant risks identified in any of the other components above in respect of the Group
audit.
Note that a component may require a statutory audit under UK or overseas company law
irrespective of whether an audit is required for group reporting purposes.  Management
should therefore satisfy themselves that all UK and overseas company law requirements are
adhered to on a component-by-component basis.
The table below sets out our approach to the components within the group and our audit
findings in respect of each component. 
Page 49 of 392

Page 50

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 38 of 106                                                                                                              
www.azets.co.uk 
We revisited our planning group assessment, following receipt of the unaudited accounts and
our assessment was updated as follows;
Component Scope Planned audit
approach
Audit findings
Renfrewshire council Full Scope Full scope statutory
audit 
As set out in this
annual audit report.
Subject to the
outstanding matters
outlined on pages 3-5
of this report, we
expect to issue an
unqualified audit
opinion.
Renfrewshire Leisure Ltd Specific
Scope
Specific procedures
performed – 
1. Pension
asset/liability 
2. Expenditure 
Subject to the
outstanding matters
outlined on pages 3-5
of this report, we have
not identified any
findings in relation to
the planned audit
approach. (*)
Common Good Funds Specific
Scope
Specific procedures
performed – 
1.Long-term
investments 
2.Property, plant and
equipment
Subject to the
outstanding matters
outlined on pages 3-5
of this report, we have
not identified any
findings in relation to
the planned audit
approach. 
Paisley Museum
Reimagined Ltd
None No procedures
planned.
N/A (*)
Park Lane Developments
(Renfrewshire) LLP
None No procedures
planned. 
N/A (*)
Coats Observatory Trust None No procedures
planned. 
N/A (*)
Strathclyde Partnership for
Transport
Specific
Scope
Specific procedures
performed – 
Subject to the
outstanding matters
outlined on pages 3-5
of this report, we have
Page 50 of 392

Page 51

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 39 of 106                                                                                                              
www.azets.co.uk 
Investments in
associates and joint
ventures
not identified any
findings in relation to
the planned audit
approach.
Strathclyde Concessionary
Travel Scheme Joint
Committee
None No procedures
planned.
N/A
Renfrewshire Valuation
Joint Board
None No procedures
planned. 
N/A (*)
Renfrewshire Health and
Social Care Integration
Joint Board
Specific
Scope
Specific procedures
performed – 
Investments in
associates and joint
ventures
Subject to the
outstanding matters
outlined on pages 3-5
of this report, we have
not identified any
findings in relation to
the planned audit
approach.
AMIDS Renfrewshire LLP None No procedures
planned.
N/A 
(*) Azets Audit Services perform separate statutory audits of these accounts which are not
related to the group accounts audit.
Definitions: 
Full Scope: Design and perform further audit procedures on the entire financial information
of the component.
Specific Scope: Design and perform further audit procedures on one or more classes of
transactions, account balances or disclosures.
None: No further audit procedures required.  
Page 51 of 392

Page 52

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 40 of 106                                                                                                              
www.azets.co.uk 
Audit differences
Audit differences identified during the audit, identified during the audit are detailed in
Appendix 2.
We also identified disclosure and presentational adjustments during the audit, which have
been reflected in the final set of financial statements and are disclosed in Appendix 2.
Internal controls
As part of our work we considered internal controls relevant to the preparation of the
financial statements such that we were able to design appropriate audit procedures. Our
audit is not designed to test all internal controls or identify all areas of control weakness.
However, where, as part of our testing, we identify any control weaknesses, we report these
at Appendix 3. These matters are limited to those which we have concluded are of sufficient
importance to merit being reported.
Follow up of prior year recommendations
We followed up on progress in implementing actions raised in the prior year as they relate to
the audit of the financial statements. Full details of our findings are included in Appendix 4.
Other communications
We set out below details of other matters which we, as auditors, are required by auditing
standards and the Code to communicate to those charged with governance. 
Matter Audit commentary and findings
Significant matters on which there was
disagreement with management
There were no significant matters on which
there was disagreement with management. 
Significant management judgements
which required additional audit work and /
or where there was disagreement over the
judgement and / or where the judgement
is significant enough that we are required
to report it to those charged with
governance before they consider their
approval of the accounts
At the time of writing this report, there were
no major transactions that required special
accounting consideration. 
Page 52 of 392

Page 53

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 41 of 106                                                                                                              
www.azets.co.uk 
Matter Audit commentary and findings
Prior year adjustments identified
At the time of writing this report, there were
no prior year adjustments found by the audit
team.
However, there were restatements to the
account identified by the Council’s finance
team, which were all disclosed in the
unaudited accounts, including the following; 
• Restatement of PPE note: Following a
review of the Council's asset
componentisation policy under the
CIPFA Code of Practice, certain assets
previously recorded within Vehicles,
Plant, Furniture and Equipment have
been reclassified to Council Dwellings
or Other Land and Buildings. This
change reflects the assessment that
these assets are building components
forming part of the properties, rather
than separate plant or equipment
assets.
• Restatement of Common Good Funds
Paisley and Renfrew Income and
expenditure statement: During
2024/25, following a review of
historical title and legal advice, the
Council reclassified £1.090m of
property from Council assets. This was
reflected in the reserves balance
directly in the prior year. However, it
should have been recorded as income
in the prior year. 
• Restatement of Group accounts:
Upon receiving the audited accounts
of the Group's components, the
Page 53 of 392

Page 54

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 42 of 106                                                                                                              
www.azets.co.uk 
Matter Audit commentary and findings
consolidation was revised to
incorporate the final audited figures.
Concerns identified in the following:
• Consultation by management with
other accountants on accounting or
auditing matters
• Matters significant to the oversight of
the financial reporting process
• Adjustments / transactions identified
as having been made to meet an
agreed system position / target
No concerns were identified. 
Accounting policies
The accounting policies used in preparing the financial statements are unchanged from the
previous year with the exception of property, plant, and equipment valuation. 
Our work included a review of the adequacy of disclosures in the financial statements and
the appropriateness of the accounting policies adopted by the Council. 
Subject to the outstanding matters outlined on pages 3-5 of this report, the accounting
policies, which are disclosed in the financial statements, are in line with the CIPFA LASAAC
Code Practice on Local Authority Accounting in the UK 2025/26 (the ‘CIPFA Code’) and are
considered appropriate.
Key judgements and estimates
As part of the planning stages of the audit, we identified the accounting estimates made by
management and determined which of those are key to the overall financial statements.
Consideration was given to non-current asset valuations, valuation of pension assets and
liabilities. Other than council dwelling and other land and building valuations and the
valuation of pension assets/liabilities we have not determined the accounting estimates to be
significant. See the section above on “Significant risks at the assertion level for classes of
transaction, account balances and disclosures” for detailed findings in relation to key
accounting estimates.
Page 54 of 392

Page 55

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 43 of 106                                                                                                              
www.azets.co.uk 
We reviewed the key estimates and judgements that management made in respect to the
identified key accounting estimates for indication of bias and assessed whether the
judgements used by management are reasonable. Subject to the outstanding matters listed
on pages 3-5 of this report, we have concluded that those key accounting estimates were
balanced and appropriate.
Presentation and disclosures
Subject to the outstanding matters outlined on page 3-5 of this report; on the basis of the
work carried out as at the date of writing this report, there are no significant financial
statements disclosures that we consider should be brought to your attention. All the
disclosures required by relevant legislation and applicable accounting standards have been
made appropriately. 
Fraud and suspected fraud
We have previously discussed the risk of fraud with management and the Audit, Risk and
Scrutiny Board. We have not been made aware of any material incidents in the period. No
issues have been identified during the course of our audit.
Our work as auditor is not intended to identify any instances of fraud of a non-material
nature and should not be relied upon for this purpose.
Non-compliance with laws and regulations
As part of our standard audit testing, we have reviewed the laws and regulations impacting
the Council. There are no indications from this work of any significant incidences of non-
compliance or material breaches of laws and regulations. You have not made us aware of any
significant incidences of non-compliance with relevant laws and regulations
The Local Authority Accounts (Scotland) Regulations 2014
As part of our audit we reviewed the Council’s compliance with the Local Authority Accounts
(Scotland) Regulations 2014, in particular with respect to regulations 8 to 10 as they relate to
the annual accounts. 
Overall, we concluded that appropriate arrangements were in place to comply with these
Regulations.
Written representations
A letter of management representations has been requested from the Council. These are to
be approved at the same time as the financial statements are approved by the Audit, Risk
and Scrutiny Board, signed by the director of finance and resources, and will be provided to
us before we complete our audit and issue our auditor’s report.
Page 55 of 392

Page 56

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 44 of 106                                                                                                              
www.azets.co.uk 
Related parties
We are not aware of any related parties or related party transactions which have not been
disclosed.
Confirmations from third parties
We are awaiting receipt of the pension fund assurance letter in relation to OneRen and the
Council from the auditor of the Strathclyde Pension Fund. 
Page 56 of 392

Page 57

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 45 of 106                                                                                                              
www.azets.co.uk 
Wider scope of public audit
Reflecting the fact that public money is involved, public audit is planned and undertaken from
a wider perspective than in the private sector. The wider-scope audit specified by the Code of
Audit Practice broadens the audit of the accounts to include consideration of additional
aspects or risks in areas of financial management; financial sustainability; vision, leadership
and governance; and use of resources to improve outcomes.
Financial management
Financial management is concerned with financial capacity, sound budgetary processes and
whether the control environment and internal controls are operating effectively.
Auditor judgement
Risks exist to the achievement of operational objectives 
Financial performance and revenue performance against budget
2025/26 Revised
Budget
£m
Actual
£m
Variance
£m
Chief Executive's Service 30.217  30.195  0.022 
Children's Services 273.812  275.837  (2.025)
Environment, Housing and Infrastructure 78.346  78.047  0.299 
Finance and Resources 51.124  50.893  0.231 
Miscellaneous Services 19.907  18.243  1.664 
Adult Services* 112.122  112.122  0.000 
Net Expenditure 565.528  565.337  0.191 
Revenue Support Grant (368.933) (368.933) 0.000 
Council Tax Income (108.199) (108.204) 0.005 
Y
Page 57 of 392

Page 58

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 46 of 106                                                                                                              
www.azets.co.uk 
2025/26 Revised
Budget
£m
Actual
£m
Variance
£m
Non-Domestic Rates Income (108.844) (108.844) 0.000 
Funding (585.976) (585.981) 0.005 
Contribution to General Fund Balances (20.448) (20.644) 0.196 
Source: Renfrewshire Council Unaudited Annual Accounts 2025-26
* For Adult Services, there was a planned drawdown from HSCP reserves of £5.710m. This
does not impact on the Council's General Fund balance, so is omitted from this presentation.
The Council reported a small General Fund underspend of £0.2m as at 31 March 2026. While
actual funding was in line with the revised budget, the underspend was mainly due to lower-
than-budgeted net expenditure across services. Although the General Fund for 2025/26
faced budget pressures from rising waste management costs, inflation affecting vehicle parts
and specialist contractors, increased public building repair expenses, higher children's social
care costs, and staffing pressures in schools, these additional costs were largely offset by
higher investment income, additional funding for packaging waste disposal, and lower-than-
budgeted loan charges for the learning estate. This resulted in an underspend equivalent to
0.03% of the budget.
The Council's largest category of expenditure is staffing. In 2025/26, a two-year national pay
settlement was agreed for local government workers, providing pay increases of 4.0% for
2025/26 and 3.5% for 2026/27. In recognition of the challenging financial environment, the
Scottish Government provided councils with additional funding to support this pay
settlement in 2025/26. For Renfrewshire, this amounted to £2.6m, covering an additional 1%
for 2025/26 only.
Adult social care experienced a year-end overspend of £5.7m, which reduced the reserves of
the Renfrewshire Health and Social Care Partnership (HSCP), which operates these services.
As this overspend was funded through the use of HSCP reserves, it did not impact the
Council's General Fund balance.
The Council fell just short of its target in-year Council Tax collection rate of 95% in 2025/26,
achieving a creditable 94.7%. This represented an improvement on the 2024/25 collection
rate of 94.5%.
Page 58 of 392

Page 59

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 47 of 106                                                                                                              
www.azets.co.uk 
The Council's General Fund balance as at 31 March 2026 was £159.4m, of which £147.9m
had been earmarked for specific purposes, leaving unallocated reserves of £11.5m. The level
of unallocated reserves is consistent with the recommended minimum balance of £10m
agreed by the Council in September 2020 and subsequently reconfirmed as a core financial
planning principle. The Council considers this level of reserves to be appropriate given the
financial risks it currently faces.
While the table above shows the service position, the Council also monitors revenue budget
performance by Policy Board, as set out below.
Policy Board  Revised Annual
Budget
£000
Actual
Annual
Outturn
£000
Budget
Variance
(Adverse) or
Favourable
£000
Budget
Variance
(Adverse) or
Favourable
%
Communities and Housing
Services 
14,924   13,712   1,212  8%
Education and Children's
Services 
268,553  271,384  -2,831  -1%
Infrastructure, Land and
Environment 
40,647   41,099  -452  -1%
Finance, Resources and
Customer Services 
100,376  98,155  2,221 2%
Adult Services  112,122  117,832  -5,710  -5%
Planning and Climate Change  625   606   19  3%
Economy and Regeneration  3,621   3,562   59  2%
Leadership (Chief Executive's
Service) 
24,660   24,697  -37  0%
GENERAL SERVICES NET
EXPENDITURE 
565,528  571,047  -5,519  -1%
Page 59 of 392

Page 60

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 48 of 106                                                                                                              
www.azets.co.uk 
Policy Board  Revised Annual
Budget
£000
Actual
Annual
Outturn
£000
Budget
Variance
(Adverse) or
Favourable
£000
Budget
Variance
(Adverse) or
Favourable
%
Housing Revenue Account
(HRA) 
-     -     -    0%
NET EXPENDITURE  565,528 571,047  -5,519  -1%
Source: Council meeting 22 June 2026: Renfrewshire Council revenue budget monitoring
statement 2025/26 1 April 2025 to 31 March 2026 
The key variances movements were due to the following factors:
- Communities & Housing: £1.2m underspend, mainly due to staff vacancies within
Housing and Justice Social Work, together with savings arising from a review of
overhead costs.
- Education & Children's Services: £2.8m overspend, driven largely by higher-than-
anticipated school staffing and operating costs. 
- Finance, Resources & Customer Services: £2.2m underspend, reflecting lower
property repair costs, higher-than-budgeted school meal income, and savings on
energy costs, rates relief, and loan charges. 
- Adult Service: £5.7m overspend, driven largely by primarily by rising costs of external
care-at-home packages due to increasingly complex needs of patients discharged
from hospital, alongside additional overspends in supported living and carers' respite
services caused by growing demand and client needs.
Housing revenue account (HRA)
The Housing Revenue Account (HRA) balance as at 31 March 2026 was £7.9m, an increase
from £6.9m in the previous year. The Council considers this to be a prudent level of
unallocated reserves for the HRA, helping to mitigate the impact of unforeseen risks and
providing a degree of resilience against forecast financial pressures arising from the
prevailing economic climate.
Although property repairs and maintenance costs, including voids management, significantly
exceeded budget, this was offset by lower capital financing charges and higher interest
receivable as a result of increased interest rates during the year. Consequently, a
contribution of £1.0m was made to reserves.
Page 60 of 392

Page 61

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 49 of 106                                                                                                              
www.azets.co.uk 
Statutory reserves 
Opening
balance £m 
Contribution to
Reserves £m
Use of
Reserves £m
Closing
balance £m
Insurance Fund 3.029 0.137 - 3.166
DHN Repair and Renewal Fund 0.186 0.372 - 0.558
Reservoir Repair Fund 0.358 0.015 - 0.373
Education Capital Items 1.407 0.285 -0.275 1.417
Investment Capital Fund 79.028 2.993 -21.63 60.391
Total 84.008 3.802 -21.905 65.905
Source: Renfrewshire Group Unaudited Annual Accounts 2025/26 
Statutory reserves totalled £65.905m as at 31 March 2026, representing a net decrease of
£18.103m during the year. This reduction primarily reflects resources committed to
supporting the Council's capital investment programme. 
Capital expenditure
On 27 February 2025, the Council approved a Housing Capital Investment Programme of
£56m and a General Fund Capital Investment Programme of £129m for 2025/26. Capital
expenditure during the year was affected by contractor availability, project complexity, and
inflationary pressures on construction and professional service costs. As a result, both
programmes were reprofiled during the year. Actual expenditure totalled £44m on housing
projects, representing approximately 78% of the approved budget, and £111m on General
Fund projects, representing approximately 86% of the approved budget. Capital expenditure
remained within the overall spending limits approved by the Council. The Non-Housing
Capital Programme was reprofiled on 1 May 2025 and approved by the Council at that time.
To support the 2025/26 capital programme, the Council undertook £64m of new long-term
PWLB external borrowing. The level of cash balances held by the Council remained consistent
with its daily cash flow requirements, treasury management activities, and capital investment
plans. The increase in cash balances compared with 31 March 2025 was partly attributable to
the receipt of grant funding for the AMIDS South project towards the end of the financial
year.
Page 61 of 392

Page 62

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 50 of 106                                                                                                              
www.azets.co.uk 
The actual Capital Financing Requirement (CFR) as at 31 March 2026 was £650.9m, which
was within the approved Authorised Limit of £702.0m. The Council's external borrowing has
been used solely to finance capital investment. Net external debt stood at £417.2m as at 31
March 2026, compared with the approved Operational Boundary of £674.0m. The actual
ratio of financing costs to net revenue stream (General Fund) for 2025/26 is 2.8%. The
Council's borrowing costs remain among the lowest of Scottish local authorities, are
considered affordable, and are aligned with the Council's medium- to long-term financial
strategy.
Capital projects
The purpose of the narrative below is to update on the progress of the council’s significant
capital projects.
School projects 
School Progress
An update on the above schools development progress was presented to the Education and
Children’s Services Policy Board meeting  in May 2026:  
• The project to deliver a new Paisley Grammar School Community Campus was completed
on 20 August 2026. It was delivered on time and on budget.
• Advance works on Park Mains High School Extension & Internal Interventions has begun
in March 2026 to prepare the site and complete groundworks ahead of the main
construction phase. The project is on track for completion by August 2027.
• Thistle Primary School remains on track to complete in the summer of 2027. 
School capital and revenue costs 
The gross capital cost of building a new primary school and the Park Mains High School
extension has remained as last reported and expected to be c.£82m, with c.£18m of
contribution expected from the developer, reducing to net capital cost of £64m. The gross
cost is allocated as follows:
• £45m for new primary school in Dargavel (named as Thistle Primary School)
• £37m for the Park Mains High School extension (to be reduced by the developer
contribution).
The Council plans to borrow for the Park Mains High School extension, and to fund the build
of the new Thistle Primary School from the investment capital fund (reserves). This fund has
had reserves at £60.4m and is held by the Council to support the Council’s capital investment
programme and to support the Council manage its long-term debt position.
Page 62 of 392

Page 63

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 51 of 106                                                                                                              
www.azets.co.uk 
Clyde Waterfront & Renfrew Riverside (CWRR) project 
The Clyde Waterfront & Renfrew Riverside (CWRR) project, which the Renfrew Bridge was a
significant component of, was a long-term large-scale infrastructure project for the Council as
part of the City Deal programme. Originally approved as part of City Deal in late 2014, there
were a few adjustments to the timelines and budget, for which approval was obtained in
accordance with both the Council’s and the Glasgow City Region governance.  
The City Deal programme was within the remit of the Leadership board and reported into the
City Deal & Infrastructure programme board, chaired by the Chief Executive and consisting of
senior officers.
The original project timeline was site start 2018 and completion by end 2020. However, due
to delays in planning the timeline was ultimately extended out and coupled with extended
tender process during COVID which included a negotiated tender stage contractor stated on
site in November 2021 and completed in May 2025.  
The CWRR project commenced in 2024/25 with an initial budget of £78.3m. The budget has
been extended due to a budget transfer from another City Deal project, increased costs
resulting from the delay in statutory processes as mentioned above, and inflationary
pressures experienced including impact on steel pricing resulting in the new budget of
£117.7m. The actual spend is £117m against the £117.7m revised budget.
Treasury management
The Council actively manages treasury risks to minimise its exposure to financial market
volatility and protect funding for services. It follows CIPFA’s Code of Treasury Management
and has policies covering credit, liquidity, and market risks.
The strategy aims to balance risk with returns or costs. The Treasury Management Strategy
Statement (TMSS) was approved by the Council on 27 February 2025 with a mid-year update
on 11 December 2025. 
The Council’s borrowing strategy is prudent and to firstly use internal cash balances to
finance the Capital Investment Programme, as borrowing rates have continued to remain
persistently high throughout the financial year. Given the changing climate and the risks
inherent in economic forecasts, a cautious approach was taken during the year regarding
treasury operations, with market conditions regularly monitored and borrowing plans
adjusted accordingly.
Overall, the Council’s total net external long-term borrowing increased by £57.4m, all from
PWLB borrowing. This additional borrowing was undertaken to maintain appropriate cash
Page 63 of 392

Page 64

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 52 of 106                                                                                                              
www.azets.co.uk 
balances in support of the Capital Investment Programme. Borrowings from Common Good
funds increased by £0.5m and other partner bodies increased by £6.3m.
Temporary investments held by the Council increased by £42.4m. The increase in
investments is due to the new PWLB borrowing, together with grant income received
(Levelling Up Fund) at the end of the financial year. 
No debt rescheduling was undertaken during the year.
The Council’s policy is to ensure that no more than 15% of loans are due to mature within
any financial year and 50% within any rolling five-year period through a combination of
prudent planning of new loans taken out and, where it is economic to do so, making early
repayments. The Council complies with this policy. 
Systems of internal control
We have evaluated the Council’s key financial systems and internal financial controls to
ensure internal controls are operating effectively to safeguard public assets.
We did not identify any significant weaknesses in the Council’s accounting and internal
control systems during our audit. 
Prevention and detection of fraud and irregularity
The Council is responsible for establishing arrangements for the prevention and detection of
fraud, error and irregularities, bribery and corruption. 
We have reviewed the arrangements and concluded that there are appropriate
arrangements for the prevention and detection of fraud, error and irregularities.
National fraud initiative
The National Fraud Initiative (NFI) is a counter-fraud exercise co-ordinated by Audit Scotland
working together with a range of Scottish public bodies to identify fraud and error. The most
recent NFI exercise commenced in 2024, the resulting matches were received from
December 2024 onwards.  
The investigation of those matches is undertaken by the Counter Fraud Officers or service
staff and is nearing completion. The Council engages well with the NFI exercise and the chief
internal auditor has concluded that the Council’s arrangements with respect to NFI are
satisfactory. The Council uploaded all relevant data for the 2024 NFI exercise by the timescale
of 31 October 2024. The Council risk assessed the matches and is progressing with
investigations.
Page 64 of 392

Page 65

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 53 of 106                                                                                                              
www.azets.co.uk 
To date £272,309 of corrections and overpayments and a further £225,786 in relation to
single person discounts of have been identified from the 2024/25 National Fraud Initiative
and these overpayments are in the process of being recovered from claimants. In addition,
£1.1m of notional savings have been identified with the majority relating to housing
tenancies, housing applications and blue badges.
During the year, we have completed a brief information return assessing the participation of
the Council. With an overall assessment of green (entirely satisfactory). The return was
submitted to Audit Scotland according to the deadline of February 2026. 
The Audit Scotland’s NFI report 2026 was published in August 2026.  
Page 65 of 392

Page 66

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 54 of 106                                                                                                              
www.azets.co.uk 
Financial sustainability
Financial sustainability looks forward to the medium and longer term to consider whether
the Council is planning effectively to continue to deliver its services and the way in which
they should be delivered.
Auditor judgement
Risks exist to the achievement of operational objectives 
Significant audit risk
Our audit plan identified a significant risk in relation to financial sustainability under our
wider scope responsibilities:
Financial sustainability (extract from 2025/26 External Audit Plan)
The Council continues to consider its medium-term financial planning through its financial
outlook and medium-term financial plan, which are regularly presented to the full Council.
The most recent medium-term financial plan update was presented to the full Council in
February 2026. The latest cumulative forecast indicates a budget gap of £c.80million over
the period 2026/27 to 2030/31 prior to council tax decisions. Assuming a 5.0-6.5% council
tax increase in over this period, this would reduce the funding gap to c£40m. The scale of
the projected funding shortfall demonstrates the continuing structural financial challenge
facing the Council over the medium term.
At the time of drafting this report the Council is still to approve its 2026/27 revenue budget
at its February 2026 meeting. The budget estimates total expenditure of £622.794million
with a deficit of £2.121million, prior to any council tax decisions. The deficit could be
temporarily addressed through the use of the financial sustainability fund.
The financial sustainability fund estimated balance as of 31 March 2026 is £34.199 million.
The fund was established for this primary reason, to support the financial position of the
Council in circumstances where, in the short term, savings have not been generated at the
scale or pace required to ensure financial balance. In 2025/26, the Financial Sustainability
Fund benefited from the second (and final) year of low employer pension contributions.
The overall council General Fund balance is forecast to be £146.285million at 31 March
2026 (£138.769million in prior year). The majority of the reserves and funds are ring
Y
Page 66 of 392

Page 67

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 55 of 106                                                                                                              
www.azets.co.uk 
Financial sustainability (extract from 2025/26 External Audit Plan)
fenced for specific purposes, with the unallocated reserves standing at £10.280million,
equivalent to 1.9% of the Council budgeted net expenditure.
Council agreed in September 2025 a £6.3m savings target for 2026/27 to maintain
recurring financial balance over the medium term. Directors and their management teams
have been developing options to deliver savings at this scale; however, the implementation
of proposals is now expected to be phased towards future years. Based on work
undertaken by services to date, and that for which specific plans are being developed over
the next two years, the Council estimates that £2.8m of savings can be confidently
incorporated into the 2026/27 base budget.
The Scottish Government’s draft budget announced in January 2026 allocated £493million
to the Council, representing a 5% increase (£23.6million) on the prior year allocation. After
adjusting for new responsibilities, areas of growing responsibility and other conditional
aspects of the settlement, this provides a like-for like comparison to 2025/26 where the
Council’s underlying core grant has increased by £11.9m (2.5%).
Pay inflation remains a significant financial risk. The Scottish Government’s medium-term
public sector pay policy indicates a 9% increase over the period 2025/26 to 2027/28, with
flexibility for employers to configure three-year proposals within this range. The current
agreed pay deal leaves only 2.5% of this envelope for 2027/28.
The Council has highlighted a timing disconnect between its ability to develop recurring
savings and the pace at which the cost pressures are emerging. The medium-term financial
plan projects increasing annual funding gaps over the planning period before mitigating
actions are implemented. The Council recognises that future financial balance will require a
combination of recurring savings, service redesign, income generation, and potentially
further council tax increases.
There remains uncertainly regarding future Scottish Government settlements, ongoing cost
pressures, and the financial sustainability of Renfrewshire Integration Joint Board. The
Council acknowledges that while short-term reserve utilisation can assist in managing in-
year pressures, underlying structure deficits must be addressed on a recurring basis to
ensure long-term financial sustainability.
Our detailed findings on the Council’s financial framework for achieving long term financial
sustainability are set out below. 
Page 67 of 392

Page 68

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 56 of 106                                                                                                              
www.azets.co.uk 
Financial landscape
Throughout 2025/26, the Council's financial monitoring reports continued to highlight the
uncertain outlook for local government finances. Whilst inflation fell from a peak of 3.8%
(CPI) in summer 2025 to 3.3% in March 2026, wider economic and political uncertainty
continued to impact the operating environment. Cost pressures, particularly those relating to
pay, energy and the delivery of frontline services, remained significant throughout the year.
To strengthen its financial resilience, the Council has continued to maintain a prudent
reserves strategy. In 2020, Council approved a target to restore unallocated reserves to a
minimum balance of £10 million to help manage unforeseen financial pressures. During
2025/26, a further £1 million was added to reserves in recognition of continued volatility in
energy and food costs.
The Scottish Government's Medium Term Financial Strategy, published in June 2025,
highlighted a projected overall funding, not specifically for Local Government shortfall of £4.7
billion by 2029/30, reflecting the expectation that future spending commitments will exceed
available resources. This presents a challenging funding outlook for local government, with
the potential for real-terms reductions in future settlements.
For 2025/26, Renfrewshire Council received an underlying increase in core grant funding of
£9.9m (2.3%) compared with the previous year. The Council also received £4.8m of additional
funding from the Scottish Government to support the increased cost of employer National
Insurance contributions from April 2025. Looking ahead, the 2026/27 local government
settlement allocated £493m to the Council, representing an increase of £23.6m (5.0%) on the
previous year. After adjusting for additional responsibilities and other conditional funding
requirements, the underlying increase was £11.9m (2.5%).
Despite these funding increases, the Council continues to face substantial medium-term
financial pressures. The Medium-Term Financial Plan presented to Council in February 2026
estimated a cumulative funding gap of approximately £80m between 2026/27 and 2030/31
before any decisions on council tax. Forecast council tax increases of between 5.0% and 6.5%
over this period would reduce the gap to around £40m; however, significant savings and
service transformation will still be required to maintain a sustainable financial position.
On 26 February 2026, the Council approved a 7.5% increase in council tax for 2026/27 and
reaffirmed its commitment to delivering approximately £20 million of savings over the
medium term. A savings target of £6.3 million had previously been agreed for 2026/27;
however, due to the complexity and lead-in time required to implement savings proposals,
only £2.8 million of recurring savings were considered sufficiently certain to be reflected in
the approved budget.
Page 68 of 392

Page 69

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 57 of 106                                                                                                              
www.azets.co.uk 
The Council's Financial Sustainability Fund increased from £21.2m at 31 March 2025 to
£35.8m at 31 March 2026. The purpose of the fund is to provide flexibility and support
financial stability where savings are not delivered at the pace or scale necessary to maintain
budget balance.
Key medium-term pressures
A significant risk to the Council's future financial sustainability remains the financial position
of the Renfrewshire Health and Social Care Partnership (HSCP). The Integration Joint Board is
forecasting a budget gap of £5.1 million in 2026/27. While reserves are expected to be used
to address this shortfall in the short term, balances are projected to fall to approximately
£6m by year end, reducing the Partnership's ability to manage future financial pressures.
Under the Integration Scheme, any future inability to set a balanced budget could require
additional financial support from partner organisations, including Renfrewshire Council. The
newest HSCP report forecasts a significant cumulative recurring budget gap of c£14m for
2027/28.
Pay inflation remains a further area of financial risk. The Scottish Government's medium-term
public sector pay policy provides for increases of up to 9% over the period 2025/26 to
2027/28. However, following the current pay agreement, only 2.5% of this provision remains
available for 2027/28, creating uncertainty over future pay settlements and associated
budget pressures.
Following approval of the Scottish Government's final Budget in February 2026, the Council
approved revisions to its 2026/27 Revenue and Capital Budgets in May 2026. The update
included additional recurring expenditure of £0.225m and one-off expenditure of £7.8m.
Additional funding was also received to support the Real Living Wage, with £0.507 million
subsequently passed to the HSCP. As a result of the council tax increase, additional
government funding and the planned use of £1.2 million from reserves, the projected
revenue budget deficit of £2.1m was eliminated, resulting in a balanced budget for 2026/27.
The Council also revised its 2026/27 Capital Plan, increasing planned investment from £495
million to £499 million to reflect a number of changes following the budget meeting.
Financial sustainability remains a significant risk for the Council due to the increasing service
demand and the financial challenges facing the HSCP, the scale of the projected medium-
term funding gap, continued inflationary and pay pressures and uncertainty surrounding
future government funding. 
Page 69 of 392

Page 70

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 58 of 106                                                                                                              
www.azets.co.uk 
Medium term financial outlook
The medium-term financial challenge and financial gap has been considered by the Council
numerous times as the budget gap poses an increasing risk to the Council’s delivery of
services over the medium-term. The Council will potentially move into a position of using its
reserves in the medium term to cover budget gaps but recognises this is not sustainable. In
the short term the 9.5% increase in council tax for 2025/26 and 7.5% in 2026/27 helps to
close the budget gap, but further years will require either continuing increases, savings or
other income generation.
The medium-term forecast was presented to the Council during September 2025.  
Medium term financial plan
Item 2025/26
£m
2026/27
£m
2027/28
£m
2028/29
£m
2029/30
£m
2030/31
£m
Opening budget gap 9.3 (2.6) 7.7 16.8 26.0 34.4
New pressures 58.3 26.5 32.6 38.6 47.5 54.7
Savings (8.3) (1.4) (1.4) (1.5) (1.6) (1.7)
Increase in SG revenue
grant
(41.9) (9.3) (5.8) (4.0) (4.0) (4.0)
Budget gap prior to
council tax decisions
8.0 15.8 25.4 33.1 41.9 49.0
CT increase  (10.6) (8.0) (8.6) (7.1) (7.5) (8.0)
Remaining budget gap (2.6) 7.7 16.8 26.0 34.4 41.0
Source: Financial Outlook and Medium-Term Financial Plan at September 2025
It is clear from the above forecast that the Council will have to face difficult choices to
address this gap including: reduce planned spend ; generate savings to offset the forecast
increase in cost; or increase income. For context, to close the gap completely by increasing
council tax would have required a 13.5% increase in 2026/27 (each 1% increase in council tax
generates c£1.1m). The most likely solution will be a combination of each of these.
The Council is aware that there would also be a short-term option of utilising reserve
balances to temporarily close the gap, however the underlying financial gap would remain to
be addressed on a recurring basis.
Page 70 of 392

Page 71

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 59 of 106                                                                                                              
www.azets.co.uk 
Key assumptions
The medium-term plan from September 2025, updated in February 2026 contains a good
level of detail and is based on a number of assumptions and uncertainties, including:
• The Scottish Government revenue support grant is likely to incorporate only very
moderate increases over the next few years, giving no assurance that the local
government settlement in future years will reflect a sufficient degree of increase to
address core budget pressures.
• The current and forecast challenging financial position of Renfrewshire IJB, and
consequent potential impact on the Council financial position is an increasing concern.
• Assumed moderate growth in revenue settlement over the medium term, with additional
slight improvement anticipated based on the relative population growth of Renfrewshire.
For context, when the Medium-Term Financial Plan at September 2025 was prepared, the
2024 mid-year estimate for population in Renfrewshire was published in late August and
shows Renfrewshire’s population has increased and stands at 189,170, an increase of
2,020 (1.1%) on 2023 and above the national rate of 0.7%. The 2025 mid-year estimate
for population in Renfrewshire was published in late July and shows Renfrewshire’s
population has increased again and now stands at 189,270, an increase of 660 (0.3%) on
2024 and above the national rate of just under 0.1%. This is seen as a positive factor by
the Council as the area attracts new people, supporting economy, but on the other hand
can create other challenges for the ageing population, schools and local services.
• The most recent local government pay settlement for non-teaching staff agreed was 4%
in 2025/26 and 3.5% in 2026/27. When the Medium-Term Financial Plan at September
2025 was prepared, the pay settlement for teachers was yet to be agreed for 2025/26
and while assumed at 3% there was consideration of the 4% already agreed for non-
teaching staff. The pay is the largest element of Council cost, so small movements will
impact the total cost (1% increase in total pay equals to almost c£3.8m increase in cost).
Pay settlement for teachers was later agreed of 4.0% for 2025/26 and 3.25% for 2026/27.
• The Council is facing further uncertainty and pressures on a few areas which will depend
on future funding confirmation: reduced class contact time for teachers (potential cost of
£3-4m per year), lifecycle maintenance and net zero will likely increase the cost, and
school transport cost has increased significantly in the recent years indicating further
increases possible.
• The IJB reported a 2025/26 forecast year-end overspend position of £6.2m, expected to
be funded from IJB reserve balances. Ongoing utilisation of reserves to fund future
overspends creates a risk that IJB reserves may be depleted in the short to medium term.
This creates the risk that Renfrewshire IJB will seek additional funds in the coming years
from NHS Greater Glasgow & Clyde and Renfrewshire Council.
Page 71 of 392

Page 72

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 60 of 106                                                                                                              
www.azets.co.uk 
The detail of the assumptions used in preparation of the medium term financial plan is
presented below:
Core medium term plan assumptions
Assumption 2026/27
%
2027/28
%
2028/29
%
2029/30
%
2030/31
%
Pay award 3.5 3 2.5 2.5 2.5
Non-pay inflation 0 0 0 0 0
Contract inflation 3 2 2 2 2
Revenue grant 1.2 1.2 1 1 0
Council tax (rate) 6.5 6.5 5 5 5
Council tax (base) 1.2 0.9 0.9 0.8 0.8
Source: Financial Outlook and Medium-Term Financial Plan at September 2025
The medium-term Financial Outlook was updated on 26 February 2026. 
The Council’s medium-term financial outlook remains challenging despite a modest increase
in funding from the Scottish Government. While the 2026/27 local government settlement
was reported as increasing nationally by £592m, most of this funding is tied to existing and
new obligations such as pay awards, leaving only around £235m of additional flexible
funding. Renfrewshire Council’s revenue grant has increased to £493m, representing a like-
for-like rise of £11.9m (2.5%) compared with 2025/26 after adjusting for new responsibilities.
However, rising costs, particularly pay and service demand pressures, continue to outpace
funding growth.
The Scottish Government revenue support grant is likely to incorporate only very moderate
increases over the next few years. Additional concerns include the financial position of
Renfrewshire Health and Social Care Partnership and the impact this could have on Council
finances. 
Looking further ahead, the Council estimates a funding gap of approximately £80m by
2030/31 before any Council Tax decisions are made. Assuming Council Tax increases of 5.0%
to 6.5% over the period, this gap could reduce to around £40m, but substantial savings will
still be required. The Council has continued its strategy of planning on a medium-term basis,
implementing transformation and savings measures to address budget pressures, and it is
Page 72 of 392

Page 73

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 61 of 106                                                                                                              
www.azets.co.uk 
recommended that any new recurring spending commitments are matched by sustainable
savings or additional income to maintain long-term financial sustainability.
Cost improvement plans
Renfrewshire Council has previously been advised that since 2010, transformation, efficiency
and corporate financing savings in the region of £190m (up to 2025/26), have been achieved,
meaning that the Council’s ability to generate further recurring transformation and efficiency
savings at this scale without impacting on service delivery or quality will be increasingly
challenging. Additionally, over the last decade, nationally set directives as part of grant
settlements as well as local priorities, have protected spend in key areas such as Education
and Social Care, which constitute around two thirds of the Council’s budget. While
transformation and the opportunity for increased efficiency will continue to be key priorities,
it is likely that material service reductions and spending cuts across all services could be
necessary if the Council is to remain financially sustainable and also create the financial
circumstances to allow longer term strategic investment in the Council’s property estate and
infrastructure.
Council agreed in September 2025 a £6.3m savings target for 2026/27 as a route to
maintaining recurring financial balance over the medium term. Directors and their
management teams have been developing options to deliver savings at this scale; however,
the implementation of proposals is now expected to be phased towards future years. Based
on work undertaken by services to date, and that for which specific plans are being
developed over the next two years, £2.8m of savings were incorporated into the 2026/27
base budget. Savings targeted from early intervention, the strategic review of culture and
leisure services and income growth will not be achieved within the original planned timeline.
Departmental savings targets are also proving very challenging to achieve after more than a
decade of year on year savings being taken. 
Capital programme
Non-Housing Capital Investment Programme
Capital Investment Programme for projects across all service areas of the Council, except
Council Housing, is now presented as a 10-year rolling programme. The Council approved the
programme on 26 February 2026 and the programme was updated on 14 May 2026. 
The Scottish Government’s draft 2026/27 budget provides Renfrewshire Council with a
General Capital Grant of £11.7m, a reduction of £0.4m from the core funding in previous
year. Across Scotland, recurring capital funding for local government has fallen by 14% on a
Page 73 of 392

Page 74

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 62 of 106                                                                                                              
www.azets.co.uk 
like-for-like basis, limiting the ability of councils to invest in new assets and maintain existing
infrastructure. 
Given the limited prospects for generating capital receipts through asset sales, the Council is
expected to rely more heavily on borrowing to fund capital investment. However, increased
borrowing will result in revenue pressures. As capital grant allocations beyond 2026/27 have
not yet been confirmed, the Council has assumed an annual grant of £12m in future years, in
line with the Scottish Government’s Spending Review, which projects flat cash capital funding
over the next five years.
The revised Capital Plan 2026/27 to 2035/36 budget is presented below.
Capital Plan 2026/27 to 2035/36  Draft
Budget 
£000s 
Revised
Budget 
£000s 
Change 
£000s
Major Programmes   
Schools Estate Programme  263,159   261,759  -1,400 
Schools Transformation & ICT  8,300   8,300   -   
Lagoon Internal Play Centre  500   500   -   
Leisure Facilities Upgrade Programme  -     2,000   2,000 
Active Sports Pavilions Upgrades  -     200   200 
Skoobmobile replacement  -     300   300 
Community Halls Refurbishment  680   680   -   
City Deal Projects  2,140   2,140   -   
AMIDS South  42,683   42,683   -   
Paisley Museum  4,359   4,359   -   
Town Centre Regeneration  2,300   2,300   -   
Place Based Fund  723   723   -   
Asset Lifecycle Maintenance Programmes    
Page 74 of 392

Page 75

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 63 of 106                                                                                                              
www.azets.co.uk 
Capital Plan 2026/27 to 2035/36  Draft
Budget 
£000s 
Revised
Budget 
£000s 
Change 
£000s
General ICT Replacement  8,150   8,150   -   
Buildings Capital Lifecycle  34,633   34,633   -   
Traffic Management  226   226   -   
Private Sector Housing Grant  7,500   7,500   -   
Vehicle Replacement  22,320   22,320   -   
Roads & Footpaths  86,627   86,627   -   
Other projects  10,508  14,008  3,500
Total Planned Spend  494,808   499,408   4,600 
Funded by:  000s   000s   000s 
Prudential Borrowing  243,707   243,707   -   
Total Borrowing  243,707   243,707   -   
General Capital Grant  119,706   119,706   -   
BAE contribution (Park Mains)  18,000   18,000   -   
Usable Capital Receipts  26,842   26,842   -   
Capital Funded from Current Revenue (CFCR)  86,553   91,153   4,600 
Total Resource Availability  494,808   499,408   4,600 
Source: Council meeting 14 May 2026 Revenue and Capital Budget Update 2026/27 Capital
Plan 2026/27 to 2035/36  
Page 75 of 392

Page 76

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 64 of 106                                                                                                              
www.azets.co.uk 
Housing Capital Investment Plan
The HRA operates a rolling 30-year Business Plan model which is the standard operating
practice amongst local authorities and Registered Social Landlords. The 30-year basis of the
model reflects the need for a long term planned approach to the replacement of major items
such as rewiring and central heating aligned to the lifecycle of the element. 
The Council plans to deliver a total investment of £337.3m in the Council’s housing stock over
the 5-year period. It is anticipated that this level of investment will attract £51.2m of
government grant for new builds and this results in a net capital programme amounting to
£286.1m. The programme includes allowances for new build homes, related Scottish
Government grants, regeneration and renewal, and the planned investment programmes
required to ensure council house stock is maintained at the appropriate standards.  
Page 76 of 392

Page 77

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 65 of 106                                                                                                              
www.azets.co.uk 
Vision, leadership and governance
Vision, Leadership and Governance is concerned with the effectiveness of scrutiny and
governance arrangements, leadership and decision making, and transparent reporting of
financial and performance information.
Auditor judgement
Effective and appropriate arrangements are in place 
Vision 
The Council Plan articulates the Council’s vision, priorities and strategic outcome. The
Council’s vision to 2027, as described in the Council Plan is: ‘Creating a fairer Renfrewshire
built on innovation, wellbeing, and opportunity’. 
The Council Plan strategic outcomes are used to underpin the Council’s internal and external
communication and engagement and these align to their organisational values. The Plan has
five main strategic outcomes: Place, Economy, Fair, Green and Living our values.
The Council Plan covers the period 2022 to 2027 and was revised during 2024. The
Community Plan covers the period 2017 to 2027 and serves as Renfrewshire’s Local
Outcomes Improvement Plan. The Council works with local partners to achieve a
Renfrewshire that is Thriving, Well, Fair and Safe. 
Corporate leadership team
The Council senior team consists of the Chief Executive, three Directors of departments,
Chief Executive of partner organisation OneRen, and Chief Officer of the HSCP.  
Governance arrangements
The Council’s governance framework comprises the systems and processes, and culture and
values, by which the Council is directed and controlled and through which it accounts to,
engages with and leads the community. The Council has approved and adopted a Local Code
of Corporate Governance and publishes information on how it complies with that Code. 
The Audit, Scrutiny and Risk Board (ARSB) is an independent-chaired committee made up of
nine councillors from across all political parties. It oversees audit, scrutiny, risk management
and governance arrangements, monitors progress against audit recommendations, reviews
service performance, and makes recommendations to the Council.
Changes being made regarding governance arrangement in the year are as follows: 
Page 77 of 392

Page 78

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 66 of 106                                                                                                              
www.azets.co.uk 
Service Delivery, Performance and Governance
To strengthen its performance management the Council established an officer-led
Performance Board in 2025/26, chaired by the Director of Environment, Housing and
Infrastructure. The new Board oversees service performance and improvement activity. It
reviews the Council Plan scorecard and other performance information quarterly, escalating
issues to the Corporate Management Team where additional scrutiny is required, and driving
an improvement agenda across Council services.
Elected Members and Employees
The employee Code of Conduct was updated as part of the People Strategy, with a revised
version approved by the Members’ in June 2026.
Risk Management 
During 2025/26, the Council continued to strengthen its risk management arrangements by
implementing recommendations from an independent Willis Towers Watson review, which
found the Council’s approach to be well established with strong governance and a positive
risk culture. Key developments included approval of an updated Risk Matters policy and
strategy in May 2026 and the transfer of the risk and insurance function to the Head of
Business Services, Risk and Safety.
Counter fraud 
The whistleblowing policy which was revised in April 2026 and approved by the Finance,
Resources and Customer Services Policy Board to reflect the disclosure protections being
brought in as part of the Employment Rights Act 2025 reforms.
Internal audit 
The internal audit service operates in accordance with the Public Sector Internal Audit
Standards and reports to the Audit, Risk and Scrutiny Board. Internal audit undertakes an
annual programme of work, approved by the Board, based on a strategic risk assessment. 
Regular reviews of the Council’s governance arrangements are undertaken by internal audit.
The programme of work undertaken by internal audit during 2025/26 identified three
occasions where a limited assurance level was given in relation to the internal control, risk
management and governance objectives for the specific areas of each audit review. All were
specific to individual service areas and although these areas require to be addressed there is
no significant impact on the Council’s overall system of internal control and action plans are
in place to address the risk identified. 85% of all internal audit recommendations followed up
during the year have been implemented by the due date which is an improved position from
last year.
Page 78 of 392

Page 79

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 67 of 106                                                                                                              
www.azets.co.uk 
The internal audit opinion for 2025/26 was, “subject to management addressing the critical
and important recommendations made and the limited assurance report findings, it is
considered that reasonable assurance can be placed upon the adequacy and effectiveness of
the Council’s internal control, risk management and governance arrangements”. This opinion
is consistent with prior years.
Internal audit presented results of their activity for 2025/26; 90.1% of the internal audit plan
was completed against a target of 90%. 
We consider internal audit work during our risk assessment and on an ongoing basis.
Leadership programme 
Following completion of the SOLACE Leadership Development Programme and evaluation of
all three cohorts, the Council undertook a review of its approach to leadership development. 
The review drew on a range of internal and external evidence sources, including programme
evaluation, employee feedback, Best Value activity, organisational insight from the Council's
Cultural Assurance Model (CAM) and Risk Assurance Model (RAM), engagement with Scottish
local authority Organisational Development networks, and participation in the Improvement
Service's Local Government Leadership Success Profile pilot.   The review identified the key
leadership themes and development priorities required to support delivery of the Council's
future objectives and has informed the design of the Council's new Leadership Development
Framework.
Alongside this review, the Council has continued to invest in leadership capability through a
range of corporate and service-based activities.  Chief Officer Team Away Days are held
regularly throughout the year and focus on strategic leadership priorities including public
service reform, financial sustainability, resilience, organisational change, community planning
and place-based service delivery.   The Council's Our Leaders Forum also brings together
approximately 125 senior managers several times each year to support leadership learning,
organisational awareness and cross-Council collaboration.   During 2025/26, forum topics
included consultation and engagement, supportive leadership conversations, workforce
wellbeing, Connected Communities, Council planning, Artificial Intelligence, and
organisational change.   Flexible management development opportunities also continue to be
available through programmes such as Lead to Succeed, service-based initiatives, topic-
specific development activity, and a broad range of instructor-led and digital learning
opportunities, with almost 7,000 leadership and management e-learning completions
recorded during 2025/26.
Drawing on the findings of the review, wider organisational learning and external
benchmarking, the Council has designed a new Leadership Development Framework to
provide a clear and consistent approach to building capability across the organisation.  The
framework introduces a four-tier model covering development from frontline supervisors to
Page 79 of 392

Page 80

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 68 of 106                                                                                                              
www.azets.co.uk 
Chief Officers and provides flexible, personalised learning pathways aligned to individual
development needs and Council priorities.  It covers areas including governance, people
management, organisational culture, wellbeing, strategic leadership, organisational change,
workforce planning, partnership working, digital capability and continuous improvement,
supported through a blend of workshops, e-learning, webinars, self-directed learning and
Chartered Management Institute (CMI) accredited modules.  The framework is designed to
strengthen management and leadership capability across the organisation and support future
succession planning.  
Subject to approval by the Corporate Management Team, implementation of the new
framework will commence during 2026/27, introducing a flexible, predominantly on-demand
development offer complemented by targeted workshops and accredited learning.  For the
first time, this will provide a single leadership development offer covering all management
levels across the Council, c1200 staff, with a clear development pathway from frontline
supervisors through to Chief Officers. 
Page 80 of 392

Page 81

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 69 of 106                                                                                                              
www.azets.co.uk 
Use of resources to improve outcomes
Audited bodies need to make best use of their resources to meet stated outcomes and
improvement objectives, through effective planning and working with strategic partners and
communities. This includes demonstrating economy, efficiency, and effectiveness through
the use of financial and other resources and reporting performance against outcomes.
Auditor judgement
Risks exist to the achievement of operational objectives 
Performance Management Arrangements
The Council has a performance framework to measure against its 2022-27 Council Plan
objectives. A high level summary of the Framework is presented below:  
Source: The Council’s internal documentation
The framework assumes 6 monthly reporting to Leadership Board with performance
indicators against action progress grouped by Council Plan strategic outcomes. These
outcomes have also one cross-cutting theme - Improving outcomes for children and families.
Service Improvement Plans (SIP) at each service level were also given a new format to make
them aligned with the above. The reporting is done on a 6 monthly basis to relevant Boards
Y
Page 81 of 392

Page 82

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 70 of 106                                                                                                              
www.azets.co.uk 
including an annual outturn report. All performance indicators and actions in the Council Plan
Framework are included in SIPs.
The next stage of performance reporting is at operational level with a range of service-
specific performance reporting across Council to the appropriate Policy Board, together with
statutory performance reports.
Local Government Benchmark Framework (LGBF) is scrutinised by the Performance Board.
Reports on the LGBF are reported to the Audit Risk and Scrutiny Board at least twice a year,
with the last report provided in May 2026.
These documents are then used to create public performance reporting in user friendly
formats, and by using interactive presentations, case studies and dashboards. 
Statutory performance information
The Accounts Commission’s 2024 Statutory Performance Information Direction, effective
from 1 April 2025, requires councils to publish performance information in a way that allows
comparisons over time and between councils. This supports councils’ Best Value
responsibilities and enables stakeholders to assess and benchmark performance.
The Council has made proper arrangements for preparing and publishing its statutory
performance information in accordance with the Direction. The information reported on the
Council’s website is the Council’s response to meeting the requirements. 
Local Government Benchmarking Framework 
The Local Government Benchmarking Framework (LGBF) is a high-level benchmarking tool
which allows local authorities to compare their performance across a wide range of key
service areas such as education, housing, and adult social care. Renfrewshire Council has
participated in the development of the LGBF since its inception in 2010 and the framework
has expanded to comprise 108 indicators.
The most recent period available through LGBF is 2024/25 and demonstrates that the overall
performance improved in the majority of the areas as presented in the exhibit below.
Page 82 of 392

Page 83

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 71 of 106                                                                                                              
www.azets.co.uk 
Source: Local Government Benchmarking Framework website
The council’s overall performance is generally positive, with good progress being made and
sustained across the Council Plan priority areas. The council is demonstrating improved or
sustained performance across 57% of the 108 indicators published to date.
Renfrewshire Council ranks in the top 8 councils for 32 indicators, and in the bottom 8 for 16
indicators.  Areas where the Council have strong relative performance include pupil
attainment at levels 5 and 6 and in numeracy at primary school level, hospital readmissions
and delayed discharges, the condition of Class A and B roads, rent arrears, the time taken for
non-emergency housing repairs, some financial sustainability measures, and CO2 emissions
from electricity, gas and transport.
Areas where Renfrewshire ranks in the bottom quarter include school exclusions, satisfaction
rates on street cleaning and refuse collection, council tax collection, and crisis grant
processing.
Fairness and Equality
Audit Scotland has requested that we carry out audit work on the Council’s arrangements
relating to the best value theme of fairness and equality at least once during the audit
appointment. Under the statutory Best Value framework, councils are required to
Page 83 of 392

Page 84

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 72 of 106                                                                                                              
www.azets.co.uk 
demonstrate continuous improvement across a set of national themes, including fairness and
equality. 
Overall, we concluded that Renfrewshire Council demonstrates achievement of the Best
Value theme of Fairness and Equality. Fairness, equality, diversity and inclusion are
embedded throughout the Council's strategic planning, governance arrangements, workforce
policies, service delivery and continuous improvement activities. There is clear evidence of
leadership commitment, structured oversight, engagement with communities and
employees, and a strong focus on improving outcomes for people who experience inequality
or disadvantage.
The Council has continued to strengthen its commitment to equality, diversity and inclusion
through its values, governance arrangements and the Fairer Renfrewshire Programme, which
coordinates activity to reduce poverty, tackle inequalities and improve opportunities for local
people. Oversight is provided through the Fairer Renfrewshire Sub-Committee, Leadership
Board and dedicated officer groups, ensuring equality remains a key strategic priority.
During 2025/26, significant progress included the appointment of an Equalities Development
Officer, development and approval of the Equality Outcomes 2025-29 Action Plan, and
further improvements to Equality and Human Rights Impact Assessment processes. The
Council also continued to review and strengthen workforce policies, promote equal pay, and
invest in equality, diversity and inclusion training, with high levels of staff participation.
The Council has maintained a consistent focus on community engagement, working with a
range of representative groups to ensure services reflect the needs of diverse communities.
It also progressed targeted initiatives supporting care experienced people, children and
young people, BSL users, carers and employees, while expanding trauma-informed practice
across the organisation, including through the recently launched Your Voice Matters
programme.
Performance and progress are monitored through established governance and reporting
arrangements, supported by the Corporate Improvement Plan and Council Plan. Together,
these demonstrate the Council’s ongoing commitment to embedding equality, fairness and
inclusion across services, decision-making and organisational culture.  
Page 84 of 392

Page 85

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 73 of 106                                                                                                              
www.azets.co.uk 
Best Value
We are required to evaluate and report on the performance of the Council in meeting its Best
Value duties.  Our work in 2025/26 included the following: 
• Follow up: our work followed up on Accounts Commission findings, Controller of Audit
recommendations and any outstanding improvement actions reported in Best Value
Assurance Reports, Best Value thematic reports and Annual Audit Reports. Our work
reflects the Council’s self-assessment against outstanding improvement actions and
findings will be based on the Council’s current arrangements for delivering best value.
• Risk based approach to Best Value themes: we pay due regard to the Council’s
arrangements in respect of the seven Best Value themes in identifying any significant
risks.
• Assessed the effectiveness of performance reporting: the best value theme, effective use
of resources, includes an expectation that councils report effectively on their
performance. Councils should be able to demonstrate a trend of improvement over time
in delivering their strategic priorities.
• Thematic review of asset management: we are required to report on Best Value or
related themes prescribed by the Accounts Commission. The thematic work for 2025/26
focused on how well the councils are managing their assets to achieve their corporate
objectives and respond to challenges around financial sustainability and climate change. 
We also contributed to Controller of Audit reports, as and when required.
As set out in the Code of Audit Practice 2021, Best Value audit is integrated with other wider-
scope annual audit work. Therefore, in addition to the work set out in the remainder of this
section, Best Value work has informed the content and conclusions set out in respect of our
wider scope responsibilities.  
Page 85 of 392

Page 86

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 74 of 106                                                                                                              
www.azets.co.uk 
The Council’s response to the Best Value Controller of
Audit (CoA) Report and Accounts Commission findings 
Risks to the achievement of objectives are managed 
The Controller of Audit reports to the Accounts Commission on each council’s performance in
meeting its Best Value duties at least once over the five-year audit appointment. Auditors are
required to include judgments on the pace and depth of continuous improvement in the
council as part of their wider scope work to contribute to these reports.
A Controller of Audit Best Value report for Renfrewshire Council has been prepared by Audit
Scotland and was considered by the Accounts Commission on 15 May 2025. Following this,
the Accounts Commission published their findings on 5 June 2025 and the report was
presented to the Council on 26 June 2025. During 2024/25 we were working with the
Controller of Audit to allow preparation and finalisation of the Best Value report for the
Council. This report is based on previous reporting on the Council as prepared by Azets and
the Controller of Audit.
The report was largely positive and stated that Renfrewshire Council has a strong
commitment to improving, including creating a positive culture, supporting its staff to
develop as leaders, and focusing on engaging with residents. The report noted that the
Council must now talk to them about tough spending decisions that lie ahead.
It highlighted the Council’s commitment to leadership and creating a positive working culture
across services, welcomed positive response to the issues associated with the Dargavel
school, expressed interest in the Cultural Assurance Model, outlined good examples of
activities enabling and supporting community engagement. The report also commented on
prudent financials and financial sustainability, commented on existence of the complex
capital programme and member development in place, it referred to the areas of strong
performance (education). There was no suggestions or further recommendations being
made. 
G
Page 86 of 392

Page 87

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 75 of 106                                                                                                              
www.azets.co.uk 
Thematic review: Asset Management
The thematic work for 2025/26 was on asset management. Auditors were required to
consider how councils are managing their assets to ensure high-quality services whilst also
responding to challenges around financial sustainability and climate change. We reported our
conclusions in a separate report. Key findings are detailed below.  
To what extent does the
council have a clear asset
management strategy and
plans that align with its
corporate objectives, new
ways of working, the changing
needs of its population, and
net zero commitments?
Auditor judgement
Effective and appropriate arrangements
are in place, with small improvements
possible 
The council’s recent, fully integrated Corporate Asset
Management Strategy provides a clear corporate
framework for asset management. 
There is a strong link between assets, service delivery,
financial sustainability and Net Zero, consistent with CIPFA
guidance on integrated capital and asset planning.
The Strategy supports the Council’s Net Zero by 2030
commitment by embedding decarbonisation, energy
efficiency and low-carbon investment across buildings, fleet
and service transformation, reinforced through robust
governance and regional collaboration.
The Council demonstrates a clear understanding of both
short-term budget pressures and long-term financial
sustainability and explicitly links these to its ability to invest
in, maintain and rationalise assets. Reporting on
affordability could be further strengthened by including
sensitivity analysis. 
To what extent do the council’s
governance and accountability
Auditor judgement 
No major weaknesses in arrangements but
scope for improvement exists 
Y
G
Page 87 of 392

Page 88

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 76 of 106                                                                                                              
www.azets.co.uk 
arrangements support
effective asset management?
The council has strong governance arrangements for asset
management, with clear corporate oversight, integration
with financial planning, and structures to allow effective
member and officer scrutiny. 
Reporting is regular and transparent, and improving in
quality, supported by robust risk management.
The council has demonstrated the ability to deliver major
strategic projects in the challenging post-COVID
environment amid widespread cost, inflation and supply
chain pressures.  Performance has been especially strong in
the delivery of housing projects.
However, these pressures have continued to affect
elements of the wider capital programme, contributing to
recurring underspends and rephasing. This suggests further
opportunities to strengthen delivery planning, capacity and
project readiness, particularly in non-housing projects.
Over the past year, the council has improved reporting to
members by providing greater detail on project variances in
monitoring reports and making wider use of options and
recommendations.
While asset performance is generally strong for operational
buildings and with housing indicators available showing an
improvement trend. 
To what extent does the
council have a robust approach
to working with partners and
Auditor judgement
Effective and appropriate arrangements
are in place, with small improvements
possible 
G
Page 88 of 392

Page 89

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 77 of 106                                                                                                              
www.azets.co.uk 
communities in managing its
assets?
The council demonstrates strong and well-
established partnership working across
regional, local and organisational levels,
with clear alignment to strategic priorities
such as net zero, infrastructure and
economic growth.
Collaboration with other councils and
partners has enabled large-scale delivery,
access to funding and shared risk, while
internal joint working supports services
sharing buildings and more efficient use of
assets.
Community engagement is extensive and
embedded across major programmes, with
structured processes and good
transparency, including robust
arrangements for community asset
transfer. The council made use of co-
design and co-delivery approaches for
some of its projects. 
The council has effective cross-service
collaboration structures in place with
senior management team as members of
the key capital projects boards. 
All areas for improvement and associated recommendations are included in Appendix 3. 
Page 89 of 392

Page 90

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 78 of 106                                                                                                              
www.azets.co.uk 
Appendices 
Appendix 1: Responsibilities of the Council and the Auditor 79
Appendix 2: Audit differences identified during the audit 87
Appendix 3: Action plan 90
Appendix 4: Follow up of prior year recommendations 96 
Page 90 of 392

Page 91

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 79 of 106                                                                                                              
www.azets.co.uk 
Appendix 1: Responsibilities of the Council and the
Auditor
Responsibilities of the Council
The Council is required to make arrangements for the proper administration of its financial
affairs and to secure that one of its officers has responsibility for the administration of those
affairs. The Director of Finance and Resources  has been designated as that officer. The
Director of Finance and Resources is responsible for the preparation of the Council’s annual
accounts in accordance with proper practices as set out in the CIPFA/LASAAC Code of
Practice on Local Authority Accounting in the United Kingdom (the Code).
Area Council responsibilities
Corporate
governance
The Council is responsible for establishing arrangements to ensure the
proper conduct of its affairs including the legality of activities and
transactions, and for monitoring the adequacy and effectiveness of these
arrangements. Those charged with governance should be involved in
monitoring these arrangements.
Financial
statements
and related
reports
The Council has responsibility for: 
• preparing financial statements which give a true and fair view of the
financial position of the Council and its group and its expenditure and
income, in accordance with the applicable financial reporting
framework and relevant legislation
• maintaining accounting records and working papers that have been
prepared to an acceptable professional standard and support the
balances and transactions in its financial statements and related
disclosures
• preparing and publishing, along with the financial statements, an
annual governance statement, management commentary (or
equivalent) and a remuneration report that is consistent with the
disclosures made in the financial statements and prepared in
accordance with prescribed requirements. Management commentaries
should be fair, balanced and understandable.
Page 91 of 392

Page 92

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 80 of 106                                                                                                              
www.azets.co.uk 
Area Council responsibilities
Management is responsible, with the oversight of those charged with
governance, for communicating relevant information to users about the
Council and its financial performance, including providing adequate
disclosures in accordance with the applicable financial reporting
framework. The relevant information should be communicated clearly and
concisely.
The Council is responsible for developing and implementing effective
systems of internal control as well as financial, operational and compliance
controls. These systems should support the achievement of its objectives
and safeguard and secure value for money from the public funds at its
disposal. The Council is also responsible for establishing effective and
appropriate internal audit and risk-management functions.
Standards of
conduct for
prevention
and detection
of fraud and
error
The Council is responsible for establishing arrangements to prevent and
detect fraud, error and irregularities, bribery and corruption and also to
ensure that its affairs are managed in accordance with proper standards of
conduct.
Financial
position
The Council is responsible for putting in place proper arrangements to
ensure its financial position is soundly based having regard to:
• Such financial monitoring and reporting arrangements as may be
specified;
• Compliance with statutory financial requirements and achievement of
financial targets;
• Balances and reserves, including strategies about levels and their
future use;
• Plans to deal with uncertainty in the medium and long term; and
• The impact of planned future policies and foreseeable developments
on the financial position.
Best value The Council has a specific responsibility to make arrangements to secure
Best Value.  Best Value is defined as continuous improvement in the
Page 92 of 392

Page 93

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 81 of 106                                                                                                              
www.azets.co.uk 
Area Council responsibilities
performance of the body’s functions.  In securing Best Value, the Council is
required to maintain an appropriate balance among:
• The quality of its performance of its functions
• The cost to the body of that performance
• The cost to persons of any service provided by it for them on a wholly
or partly rechargeable basis.
In maintaining that balance, the Council shall have regard to:
• Efficiency
• Effectiveness
• Economy
• The need to meet the equal opportunity requirements.
The Council should discharge its duties in a way which contributes to the
achievement of sustainable development.
In measuring the improvement of the performance of a local government
body’s functions for the purposes of this section, regard shall be had to the
extent to which the outcomes of that performance have improved.
The Scottish Government’s Statutory Guidance on Best Value (2020)
requires bodies to demonstrate that they are delivering Best Value in
respect of seven themes:
1. Vision and leadership
2. Governance and accountability
3. Effective use of resources
4. Partnerships and collaborative working
5. Working with communities
6. Sustainability
7. Fairness and equality.
The Community Empowerment (Scotland) Act 2015 is designed to help
empower community bodies through the ownership or control of land and
buildings, and by strengthening their voices in decisions about public
services.  
Page 93 of 392

Page 94

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 82 of 106                                                                                                              
www.azets.co.uk 
Auditor responsibilities
Code of Audit Practice
The Code of Audit Practice (the Code) describes the high-level, principles-based purpose and
scope of public audit in Scotland.
The Code outlines the responsibilities of external auditors and it is a condition of our
appointment that we follow it.
Our responsibilities
Auditor responsibilities are derived from the Code, statute, International Standards on
Auditing (UK) and the Ethical Standard for auditors, other professional requirements and best
practice, and guidance from Audit Scotland. 
We are responsible for the audit of the financial statements and the wider-scope and Best
Value responsibilities explained below. We act independently in carrying out our role and in
exercising professional judgement. We report to the Council and others, including Audit
Scotland, on the results of our audit work.
Weaknesses or risks, including fraud and other irregularities, identified by auditors, are only
those which come to our attention during our normal audit work in accordance with the
Code and may not be all that exist.
Wider scope audit work
Reflecting the fact that public money is involved, public audit is planned and undertaken from
a wider perspective than in the private sector.
The wider scope audit specified by the Code broadens the audit of the accounts to include
additional aspects or risks in areas of financial management; financial sustainability; vision,
leadership and governance; and use of resources to improve outcomes.
Page 94 of 392

Page 95

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 83 of 106                                                                                                              
www.azets.co.uk 
Financial management
Financial management means having sound budgetary processes.
Audited bodies require to understand the financial environment and
whether their internal controls are operating effectively.
Auditor considerations
Auditors consider whether the body has effective arrangements to
secure sound financial management. This includes the strength of the
financial management culture, accountability, and arrangements to
prevent and detect fraud, error and other irregularities. 
Financial sustainability
Financial sustainability means being able to meet the needs of the
present without compromising the ability of future generations to
meet their own needs.
Auditor considerations
Auditors consider the extent to which audited bodies show regard to
financial sustainability. They look ahead to the medium term (two to
five years) and longer term (over five years) to consider whether the
body is planning effectively so it can continue to deliver services. 
Vision, leadership and governance
Audited bodies must have a clear vision and strategy and set priorities
for improvement within this vision and strategy. They work together
with partners and communities to improve outcomes and foster a
culture of innovation.
Auditor considerations
Auditors consider the clarity of plans to implement the vision, strategy
and priorities adopted by the leaders of the audited body. Auditors also
consider the effectiveness of governance arrangements for delivery,
including openness and transparency of decision-making; robustness of
scrutiny and shared working arrangements; and reporting of decisions
and outcomes, and financial and performance information.
Page 95 of 392

Page 96

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 84 of 106                                                                                                              
www.azets.co.uk 
Use of resources to improve outcomes
Audited bodies need to make best use of their resources to meet
stated outcomes and improvement objectives, through effective
planning and working with strategic partners and communities. This
includes demonstrating economy, efficiency and effectiveness through
the use of financial and other resources, and reporting performance
against outcomes.
Auditor considerations
Auditors consider the clarity of arrangements in place to ensure that
resources are deployed to improve strategic outcomes, meet the
needs of service users taking account of inequalities, and deliver
continuous improvement in priority services.
Best Value
Appointed auditors have a duty to be satisfied that local government bodies have made
proper arrangements to secure best value.
Our work in respect of the Council’s best value arrangements is integrated into our audit
approach, including our work on the wider scope areas as set out in this report.
Audit quality
The Auditor General and the Accounts Commission require assurance on the quality of public
audit in Scotland through comprehensive audit quality arrangements that apply to all audit
work and providers. These arrangements recognise the importance of audit quality to the
Auditor General and the Accounts Commission and provide regular reporting on audit quality
and performance.
Audit Scotland maintains and delivers an Audit Quality Framework.
The most recent audit quality report can be found at Quality of public audit in Scotland:
Annual report 2025/26
Independence and ethics
The Ethical Standards and ISA (UK) 260 require us to report full and fair disclosure of matters
relating to our independence. In accordance with our profession’s ethical requirements and
further to our audit plan issued confirming audit arrangements we confirm that there are no
Page 96 of 392

Page 97

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 85 of 106                                                                                                              
www.azets.co.uk 
further facts or matters that impact on our integrity, objectivity and independence as
auditors that we are required or wish to draw to your attention.  
We consider an objective, reasonable and informed third party would take the same view.
We confirm that Azets Audit Services and the engagement team complied with the FRC’s
Ethical Standard. We confirm that all threats to our independence have been properly
addressed through appropriate safeguards and that we are independent and able to express
an objective opinion on the financial statements. 
In particular:
Non-audit services: Separate teams within Azets provides the following services to two of the
Council subsidiaries (Paisley Museum Reimagined Ltd, Renfrewshire Leisure Ltd): tax
returns/compliance and preparation of the accounts. The fees for these services add up to
c.£3,710.
We have considered the following threats to independence could be present as a result of
non-audit services: self-review, self-interest, management. Accounts preparation services is a
straightforward process of the client trial balances being imported and statutory accounts
being produced. Any adjustments will be put forward to the clients management for approval
before they are made. Accounts are prepared using clients trial balances, any adjustments
are agreed with management before posting and second manager review of accounts will be
undertaken.
We assess the risk of management, self-interest and self-review is mitigated due to the fact
that the: audit of subsidiaries is performed by separate audit teams led by a different
responsible individuals; preparation of the accounts is an admin task with no judgement
applied and adjustment approved by management; impact on group audit of Paisley
Museums Reimagined is not significant and normally the Council group audit team would
perform specific procedures as required on pension asset of Renfrewshire Leisure Ltd; the
fees for preparation of the accounts are significantly lower than audit fees.
We assess the risk of management, self-interest and self-review mitigated due to the fact
that the separate team members work on the tax computation and audit which is reviewed
by separate manager/partner/director. Tax fees are substantially lower than the audit fees.
Contingent fees: No contingent fee arrangements are in place for any services provided.
Gifts and hospitality: We have not identified any gifts or hospitality provided to, or received
from, any member of the Council, senior management or staff and members of the audit
team.
Page 97 of 392

Page 98

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 86 of 106                                                                                                              
www.azets.co.uk 
Relationships: We have no other relationships with the Council, its directors, senior managers
and affiliates, and we are not aware of any former partners or staff being employed, or
holding discussions in anticipation of employment, as a director, or in a senior management
role covering financial, accounting or control related areas.
Our period of total uninterrupted appointment as at the end of 31 March 2026 was four
years.
Audit fees
The total fees charged to the Council for the provision of services in 2025/26 were as follows.
Prior year fees are also shown for comparative purposes: 
2025/26 2024/25
Auditor remuneration (expected fee level) £311,220 £299,830
Auditor remuneration (above expected fee level) £31,120 £38,464
Pooled costs £10,730 £7,530
Contribution to Performance Audit and Best Value
work (PABV) costs
£81,090 £79,800
Sectoral cap adjustment £65,430 £61,830
Total audit fee £499,590 £487,454 
The audit fees charged reconcile to the fees disclosed in the financial statements.  
Page 98 of 392

Page 99

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 87 of 106                                                                                                              
www.azets.co.uk 
Appendix 2: Audit differences identified during the
audit
We are required to inform the Council of any significant misstatements within the financial
statements presented for audit that have been discovered during the course of our audit
whether or not the financial statements have been adjusted by management.  
Adjusted misstatements
Details of items corrected following discussions with management are as below. 
Current year audit adjustments (Council and Group Accounts)
No Detail Comprehensive Income
and Expenditure
Statement
Balance Sheet  
Dr / (Cr)
£million
Dr / (Cr)
£million
1. To reverse incorrect reclassification
of one asset from Other Land and
Buildings to Infrastructure as the
asset remains separate to the land. 
11.900
(11.900) 
2. To write down nil net book value
asset that cannot be verified by the
Council. 
4.439
(4.439) 
Net impact on reserves – increase /
(decrease)
- - 
Total reserves per the unaudited
financial statements (Group)
1,887.779 1,887.779 
Revised reserves per the audited
financial statements (Group)
1,887.779 1,887.779 
Page 99 of 392

Page 100

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 88 of 106                                                                                                              
www.azets.co.uk 
Common Good
No Detail Comprehensive Income and
Expenditure Statement
Balance Sheet  
Dr / (Cr)
£’000
Dr / (Cr)
£’000
1. Common Good – Renfrew 
Understated short-term deposits
and revaluation reserve fixed
assets 
434
(434) 
Net impact on reserves – increase
/ (decrease)
- - 
Unadjusted misstatements 
We have not identified any unadjusted misstatements to report.
Misclassification and disclosure changes
Our work included a review of the adequacy of disclosures in the financial statements and
consideration of the appropriateness of the accounting policies and estimation techniques
adopted by the Council. 
We identified a number of reclassification adjustments and some minor presentational issues
in the financial statements, and these have all been amended by management. Details of all
disclosure changes amended by management following discussions are as below.
Adjusted
No Detail 
1. Minor presentational, formatting and disclosure issues. 
We proposed a number of minor changes and narrative amendments to improve
the presentation of the accounts including a change to comparative figures.
2. Updated Note 4: Expenditure and income analysed by nature to match with
supporting evidence. 
3. Updated Note 25: Related parties to provide further clarity on the classification of
the remaining balance and updated figure to match with supporting evidence.
Page 100 of 392

Page 101

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 89 of 106                                                                                                              
www.azets.co.uk 
No Detail 
4. Updated Note 6: Adjustment between accounting basis and funding basis under
regulations and Note 8: Capital Adjustment Account movement due to incorrect
treatment of a reserve drawdown in the year. 
5. Updated Note 22: Nature and extent of risks arising from Financial Instruments -
Credit risk -  Sundry Income Debt Past Due, to match with the supporting evidence 
6. Updated exit package cost disclosure- one employee moved from the £300,001 to
£350,000 band to the £350,001 to £400,000 band. 
Unadjusted 
We have not identified any unadjusted misclassification and disclosure changes to report.
Prior year unadjusted misstatements
There were no unadjusted misstatements reported in the prior period. 
Page 101 of 392

Page 102

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 90 of 106                                                                                                              
www.azets.co.uk 
Appendix 3: Action plan
Our action plan details the weaknesses and opportunities for improvement that we have
identified during our 2025/26 audit.  
The recommendations are categorised into three risk ratings:
• Significant deficiency
• Other deficiency
• Other observation
Financial statements
1. Going concern assessment  Other observation
Observation
The Council has considered the going concern assumption for
the Group however this has not been formally documented.. As
the Group comprises several component entities, the Council
should undertake a documented assessment to determine
whether each component is expected to continue providing
services for at least 12 months from the date of signing the
financial statements. The assessment should also consider any
potential impact on the Group's going concern status and
financial position.
Implication
In the absence of a formal documented Group going concern
assessment, the Council may be unable to demonstrate that all
component entities are expected to continue providing services
for at least 12 months from the date the financial statements
are signed. This increases the risk that matters affecting
individual components, and consequently the Group as a whole,
are not identified, appropriately evaluated, or adequately
disclosed, resulting in an unsupported Group going concern
conclusion.
Recommendation The Council should document its formal Group going concern
assessment on an annual basis
Page 102 of 392

Page 103

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 91 of 106                                                                                                              
www.azets.co.uk 
1. Going concern assessment  Other observation
Management response
A statement will be developed for inclusion in Group accounting
working papers from 2026/27.
Responsible officer:  Head of Finance and Procurement
Implementation date:   April 2027  
2. Review of nil net book value assets  Other deficiency 
Observation
Our sample of five fully utilised (depreciated) assets totalling
£4.4m consisted of items which could not be verified as they
were originally documented on older records which the Council
no longer accesses. Therefore, the Council has removed these
from the fixed asset register. 
The Council has a number of 'legacy' assets in their asset
register which are due to be reviewed for existence. The Council
is planning to undertake this exercise over the next year and it is
due to be completed by 2027/28. 
Implication
The inability to verify the existence of fully depreciated assets
due to a lack of supporting records increases the risk that the
fixed asset register contains assets which no longer exist, have
been disposed of, or are otherwise inaccurately recorded. 
Recommendation
The Council should complete its planned review of legacy assets
to verify the existence and continued use of fully depreciated
assets, removing any assets that cannot be substantiated.
Progress should be monitored regularly to ensure completion
by 2027/28 and to maintain an accurate fixed asset register.
Management response
The planned review of legacy assets will continue during
2026/27 to enhance the accuracy of the fixed asset register.
Responsible officer:   Head of Finance and Procurement
Implementation date: 31 March 2027
Page 103 of 392

Page 104

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 92 of 106                                                                                                              
www.azets.co.uk 
2. Review of nil net book value assets  Other deficiency 
3. Land and Building Valuation Ratios  Other observation
Observation
During our testing of asset valuations, we identified that the
internal valuation team applies land and building split ratios that
differ from those used by the external valuers. Management
was unable to provide a documented rationale for these
differences, as the ratios have been carried forward from a
historic methodology. We are satisfied this does not have a
material impact on the financial statements.
Implication
There is a risk that the allocation between land and buildings
may not accurately reflect current valuations, potentially
impacting related calculations such as depreciation. We are
satisfied the impact is not material on the financial statements.
Recommendation
The Council should review the methodology underpinning the
internally derived land and building split ratios and document
the rationale for using them in place of externally provided
valuation information.
If the Council decides to retain the internal methodology, it
should review the individual asset ratios to ensure they
appropriately reflect the current split between land and building
values, supporting the accuracy of asset valuations and
depreciation calculations.
Management response
The Council will review and document the internal methodology
for applying the land and buildings split to valuations.
Responsible officer:  Estates Lead
Implementation date:   31 March 2027 
Page 104 of 392

Page 105

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 93 of 106                                                                                                              
www.azets.co.uk 
Thematic review
Sensitivity analysis affordability reporting Other observation
Observation
The council’s reporting on affordability of capital projects and
asset management should consider providing additional
scenario/risk analysis to show the impact of changes in inflation
and interest rates or the impact of changes in demand for
services. 
Implication
This will provide users of the report with a greater
understanding of the potential consequences factors out with
the council’s control could bring.
Recommendation We recommend that the Council should consider developing its
reporting further.
Management response
This detailed reporting is done at project level when business
cases are being brought before elected members for approval.
The Business Case format will be reviewed to assess whether
further sensitivity analysis is required.
Responsible officer:  Strategic Change Manager
Implementation date:   31 December 2026 
Timelines reporting on capital projects Other observation
Observation
Individual projects are reported to individual thematic council
Boards and include details of performance against the budget in
monetary terms and explanations of any in-year adjustments.  
Implication
The explanations for variances in these reports could be further
strengthened by including timelines for each individual project
which would allow more focused scrutiny.  
Page 105 of 392

Page 106

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 94 of 106                                                                                                              
www.azets.co.uk 
Timelines reporting on capital projects Other observation
Recommendation We recommend that the Council should consider developing its
reporting further.
Management response
Capital monitoring reports will be reviewed in advance of the
next financial year. Reporting of timelines will be considered for
major projects (e.g. over £5m) and not cyclical programmes.
Responsible officer:  Head of Finance and Procurement
Implementation date:   31 July 2027 
Budget setting and management process Other observation
Observation
The Council should review whether further enhancement can
be made to capital forecasting and reporting arrangements. In
particular, it should consider strengthening the distinction in
reporting between genuine underspends, project rephasing and
changes in project scope.
Implication
These improvements would enhance the transparency and
reliability of capital programme reporting, support more
effective member scrutiny and provide greater assurance that
annual budgets reflect realistic expectations of project delivery. 
Recommendation
We recommend that the Council should consider developing its
budget setting and management process in line with the
recommendation.
Management response
Capital budget monitoring is reported to policy boards regularly
throughout the financial year. Any updates to the phasing of
spend related to the timing of the project is reported here.
Genuine underspends and overspends are reported as they
Page 106 of 392

Page 107

Renfrewshire Council: 2025/26 Annual Audit
Report to the Council and the Controller of
Audit
|   Azets 
Page 95 of 106                                                                                                              
www.azets.co.uk 
Budget setting and management process Other observation
arise, both via procurement reporting and policy board reports
on individual projects.
Responsible officer:  Director of Finance and Resources
Implementation date:   n/a 
Page 107 of 392

Page 108

Appendix 4: Follow up of prior year recommendations
As part of our audit work we have followed up on control weaknesses and recommendations
either raised in last year’s Annual Audit Report or carried forward from prior years.
Financial statements
1. IT general controls
(2024/25)
Other observation
Issue
Our specialist Technology Risk team reviewed the design
and implementation of IT general controls in the key
systems impacting preparation of the financial statements
and identified a few areas for improvement in relation
password, active directory and undertaken testing of
incident management planning. (As this is a public report
and for reasons of IT/control sensitivity, we have provided
specific details to the Council separately).
There is a risk of system issues adversely impacting the
control environment and/or financial statements. 
Recommendation We recommend that the specific IT points identified are
addressed.
Auditor update 2025/26
We have provided a specific update to the Council’s
management separately. No significant control
weaknesses or recommendations have been raised.
Outcome Action in progress. Recommendation remains open. 
2. Unapproved posted journal 
(2024/25)
Other observation
Issue
We identified from our journals testing undertaken that
large batch journals with over 50 lines require no system
approval and therefore can be posted and approved by
individuals who hold relevant access. This is due to a
system issue where there are too many line items for
approval within the system.
Page 108 of 392

Page 109

2. Unapproved posted journal 
(2024/25)
Other observation
Management have mitigating controls in place to review
period end budgetary controls where any significant
variances against budget are investigated and followed up.
As these specific journals do not required approval, this
could mean that someone could post inappropriate or
fraudulent journals without review or authorisation.
As part of our testing of management override of controls
we have not identified any instances of inappropriate or
fraudulent journal postings during the financial year.
Recommendation
Management should strengthen controls over large batch
journals by introducing an independent approval
requirement (e.g., manual secondary review) before
posting.
Auditor update 2025/26
We appreciate that management have confirmed they are
comfortable with this risk and have other mitigating
controls in place however we are required to report to
members any control weaknesses we identify on an
annual basis to ensure they are content with
management’s response on the matter. 
Work will be undertaken at the Council to assure that the
batch process is only used where necessary. Internal policy
has been drafted in the Finance team that outlines
guidance/recommended practice in relation to journal
operation and authorisation, and separation of duties but
needs further consultation to understand the outside-
Finance impact of recommendations. 
Responsible officer: Head of Finance and Procurement
Implementation 
Revised Date: FY2026/27
Outcome Action in progress. Recommendation remains open.  
Page 109 of 392

Page 110

3. Payroll transaction approval 
(2024/25)
Other observation
Issue
For one of the payroll transactions, we noted that one
individual prepared the payroll run and also authorised
this. There was no additional review by another team
member.
Based on the journals selected for audit testing we did not
identify any instances of inappropriate journals being
posted to the finance system.
There is a risk of inappropriate journals postings where
there is not a secondary review process of journals.
Recommendation
Management should strengthen controls over journals by
introducing an independent approval requirement (e.g.,
manual secondary review) before posting.
Auditor update 2025/26
The processes around payrun operation and signing of the
associated BACS payment has been reviewed, with further
separation of duties and checks now in place. Alerts and
processes within the ERP system are already in place to
mitigate any risk of fraudulent bank account changes.
Outcome Action completed. Recommendation closed. 
4. Common Good Funds - Property register
(2024/25)
Other observation
Issue
At the time of producing the Unaudited Accounts, there
were still some assets under investigation as to whether
they belonged to the Common Good. This was highlighted
on the public asset register.
There is a risk that misclassification of assets could lead to
inaccurate financial reporting and regulatory non-
compliance.
Recommendation
We recommend a decision is reached to determine
whether these are Common Good assets and if not,
update the Common Good Property register.
Auditor update 2025/26 The opinion of King’s Counsel that six of the seven
properties under investigation are confirmed as Common
Page 110 of 392

Page 111

4. Common Good Funds - Property register
(2024/25)
Other observation
Good assets, and will be adjusted in the fixed asset
register. The Common Good Note in the audited accounts
2024/25 was updated to reflect this change. 2025/26
there is no outstanding investigation.
Outcome Action completed. Recommendation closed. 
5. Common Good Funds – Rental
arrangements review (2024/25)
Other observation
Issue
Renfrewshire Council administers the Common Good Fund
for Renfrew on its behalf. Not all rental properties have
their rental fees reviewed and updated on regular basis.
The absence of documented regular rents reviews creates
uncertainty over the financial return to the fund.
Recommendation
While the Common Good Fund cannot enter into formal
lease agreements, the rents should be subject to periodic
review to confirm that they remain appropriate,
transparent, and provide a fair return to the fund.
Auditor update 2025/26
These arrangements are being reviewed as part of the
Common Good Governance Framework under
development during 2026/27. 
Responsible officer: Principal Estates Surveyor
Revised implementation date: 31 December 2026
Outcome Action in progress. Recommendation remains open. 
6. Quality of working papers (2024/25) Other observation
Issue
Our review of the working papers identified that some of
the documentation provided for audit was not always
presented in a clear or easily navigable format. To support
improvements in this area, we delivered a training session
this year and provided feedback and suggestions to the
finance team and other officers in advance of the audit.
Page 111 of 392

Page 112

6. Quality of working papers (2024/25) Other observation
While progress has been made, further enhancements to
the clarity and structure of some of the working papers
below would help reduce the extent of follow-up queries,
thereby supporting a more efficient audit process.
In particular, the reconciliation of the trial balance to the
accounts could be presented in a more structured format,
with manual adjustments more clearly identified and
supported by sufficient explanation and evidence.
Similarly, the debtor and creditor listings provided to audit
presented the opening balance plus movements however
per audit requirements we require a detailed breakdown
of all closing balances as at 31 March.
In addition, ongoing work on the reconciliation of revalued
and non-revalued assets to the fixed asset register took
longer than anticipated.
These issues can lead to delays in the audit process,
increase the risk of misstatements within the financial
statements, and reduce the efficiency of the overall audit
review.
Recommendation
We recommend that working papers be standardised and
presented with improved clarity. Reconciliations should
clearly identify manual adjustments, supported by
explanations and appropriate evidence. Debtor and
creditor listings should be reformatted to ensure all
closing balances are presented. In addition, reconciliations
between revalued and non-revalued assets and the fixed
asset register should be prepared in advance and shared
earlier in the audit cycle.
Auditor update 2025/26
The reconciliation of the trial balance to the accounts
format has been revised post discussion with management
throughout the year and we are satisfied with the updated
format. 
However, debtor and creditor listings still require further
enhancement as some debtor and creditor types only
show the opening balance and in year movements and not
a breakdown of the year end closing balance which is
required to perform audit testing.
Page 112 of 392

Page 113

6. Quality of working papers (2024/25) Other observation
Responsible officer: Corporate Finance Manager
Revised implementation date: FY 2026/27
Outcome Action in progress. Recommendation remains open. 
7. Asset Classification (2024/25) Other observation
Issue
As part of our audit procedures, we reviewed the Council’s
approach to the classification of components within
property, plant and equipment (PPE), specifically in
relation to council dwellings and schools. The Council
currently classifies certain components (such as kitchens,
heating systems, and other fixtures and fittings) under the
Vehicles, Plant, Furniture and Equipment (VPFE) asset
class.
While this treatment reflects management’s interpretation
of the applicable accounting standards, our view based on
IAS 16 and the CIPFA Code of Practice on Local Authority
Accounting is that such components form part of the
primary asset classes (i.e. “Council Dwellings” or “Other
Land and Buildings”) as they share the same nature and
use in the authority’s operations.
The issue identified gives rise to an increased risk of
misstatement or classification error.
Recommendation
We recommend that the Council reviews its classification
policy for asset components within council dwellings and
schools, with a view to either:
•Aligning the treatment to ensure that components
remain within the primary asset class, or
•Enhancing disclosures and policy documentation to
clearly explain the rationale for classifying components
separately.
Auditor update 2025/26
Review was carried out and decision was made to reassess
components classified within VPE to either Council
Dwellings or Other Land and Building. This was done as a
restatement to the opening balances of 2024/25 rather
than an in year transfer. 
Page 113 of 392

Page 114

7. Asset Classification (2024/25) Other observation
Outcome Action completed. Recommendation closed. 
8. Payroll reconciliation (2023/24) Other observation
Issue
The Council has a number of payruns running at different
frequencies. However, there is no year-end reconciliation
in place between the ledger and payroll systems to ensure
that the figures in the financial statements reconcile to the
payroll system.
There is a risk that the ledger is not complete or accurate
when reflecting payroll figures and impacting on the
financial statements.
Recommendation We recommend that the Council performs regular
reconciliation between the ledger and payroll.
Auditor update 2025/26
A payroll reconciliation process has been developed,
agreed and implemented between Payroll Services
Manager and Finance.
Outcome Action completed. Recommendation closed. 
Wider Scope
1. Appraisals and business cases reporting
(2024/25)
Other observation
Issue There is a risk of system issues adversely impacting the
control environment and/or financial statements.
Recommendation
We recommend that the council considers how it presents
options to the members to improve decision making
effectiveness and openness.
Auditor update 2025/26
The Council has further strengthened its approach to the
development of business cases and the project
management processes associated with these, including
reporting arrangements. An officer Transformation Board
has been established which regularly reviews the
development and progress of a range of significant
corporate and service projects across the council, with
Page 114 of 392

Page 115

1. Appraisals and business cases reporting
(2024/25)
Other observation
regular reporting to both the Corporate Management
Team and Leadership Board on the issues discussed. The
Transformation Board approach is informed by an agreed
‘gateway’ approach which includes clear stages projects
must adhere to in terms of identifying requirements,
clarifying scope, considering options for how objectives
can be met and clearly defining how delivery will be
achieved. The regular reporting of business cases to allow
elected member decision-making can clearly be
demonstrated in examples such as the business case
framework approach for the learning estate (see report to
the Education and Children’s Service Policy Board in May
2025); and the progression of an AI business case which
will enable broad AI-enabled transformation across the
Council as reported to the Leadership Board in April 2026.
Outcome Action completed. Recommendation closed. 
2. Capital budgeting and monitoring
(2024/25)
Other observation
Issue
The actual levels of the initial budgets utilisation
percentage were quite low in relation to initial budgets for
both housing and non-housing spend. 
Over optimistic assumptions can lead to under delivery of
the capital programme.
Recommendation
We recommend that the capital budget setting process be
revisited to ensure future estimates better reflect
prevailing market conditions and delivery capacity.
Auditor update 2025/26
Our work in this area has been covered through our
reporting of the Best Value Thematic of asset
management as summarised within this report.
Action taken by management in setting the 2025/26 non-
housing capital budget resulted in the spend v budget gap
reducing to 14% (38% in 2024/25); for the 2026/27 budget
process, we are unable to measure the impact of this until
2026/27 and therefore recommendation remains open.
Page 115 of 392

Page 116

3. Financial sustainability (2022/23) Other observation
Issue
The medium term financial challenge and financial gap has
been considered by the Council numerous times, but no
clear options have been presented or decisions made as to
how to address those challenges. The Council now needs
to make difficult spending priority decisions to secure
financial sustainability going forward.
This poses an increasing risk to the Council’s delivery of
services over the medium term and we would recommend
addressing as a priority.
Recommendation To present the Council with a range of options and
services implications.
Auditor update 2025/26
The Council’s senior management team continues to
identify options for further savings and service
transformation, for agreement by elected members in
setting future annual revenue budgets.
Outcome Action completed. Recommendation closed. 
Best Value 
1. Transformation-  Links to corporate
objectives (2024/25)
Other observation
Issue
We are satisfied that links exist between the Council’s
corporate objectives and the transformation plans and
while we note there is alignment between transformation
programme objectives and the corporate plan outcomes,
these were not formally mapped against each other.
Recommendation We recommend that the Council should consider
demonstrating the links between the transformation
2. Capital budgeting and monitoring
(2024/25)
Other observation
Responsible officer: Head of Finance and Procurement
Implementation date: FY 2026/27.
Outcome Action in progress. Recommendation remains open.
Page 116 of 392

Page 117

1. Transformation-  Links to corporate
objectives (2024/25)
Other observation
programme and its corporate plan with more clarity to
help demonstrate measurement of impact of the
transformation plan against the corporate plan.
Auditor update 2025/26
A schematic has been developed to map Transformation
projects to Council priorities, this links to the oversight
work of the Transformation Board and is outlined in the
Transformation Report for Leadership Board in February
2026. Corporate reports on transformation will also
denote alignment with Council Plan priorities. 
Outcome Action completed. Recommendation closed. 
2. Transformation-  Reporting to the
Leadership Board (2024/25)
Other observation
Issue
We note that the timescales and financial impact or
expected savings is provided for some of the projects in
the reporting to the Leadership Board, but not for all. As
different projects mature in their progress the Council
should ensure consistency of the reporting it presents in
its updates on the transformation programme. Also, while
the Council develops its strategy and savings plan it should
report timing, savings, cost and benefits expected to
measure against those.
Recommendation
We recommend that the Council continues to update its
reporting to the Leadership Board to improve high level
oversight.
Auditor update 2025/26
Update report provided to the Leadership Board in
February 2026, followed by more detailed AI
transformation report in April 2026. Six monthly reports
will continue to be submitted to the Leadership Board and
the format has been developed to address the auditor
recommendations 
Outcome Action completed. Recommendation closed. 
Page 117 of 392

Page 118

© Azets 2026. All rights reserved. Azets refers to Azets Audit
Services Limited. Registered in England & Wales Registered
No. 09652677. VAT Registration No. 219 0608 22. Registered
to carry on audit work in the UK and regulated for a range of
investment business activities by the Institute of Chartered
Accountants in England and Wales.
Moving forward with confidence
info@azets.co.uk     |    azets.co.uk
Page 118 of 392

Page 119

Finance & Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley PA1
1JB www.renfrewshire.gov.uk 
PUBLIC
My Ref: AM/CB
Contact: Alastair MacArthur
Telephone Number: 0300 300 0285
E Mail: alastair.macarthur@renfrewshire.gov.uk 
Azets Audit Services
Quay 2
139 Fountainbridge
Edinburgh
EH3 9QG 
Dear Sirs 
Renfrewshire Council
Financial Statements for the year ended 31 March 2026 
This representation letter is provided for the purpose of expressing an opinion as to whether
the Council and the Group’s financial statements present a true and fair view, in all material
respects, in accordance with applicable law and UK adopted international accounting
standards, as interpreted and adapted by the Code of Practice on Local Authority
Accounting in the United Kingdom 2025/26 (the 2025/26 Code). 
I confirm that to the best of my knowledge and belief having made such inquiries as I
considered necessary for the purpose of appropriately informing myself: 
Financial Statements
i. I have fulfilled my responsibilities as Section 95 Officer for the preparation of the
Council’s financial statements in accordance with applicable law and UK adopted
international accounting standards, as interpreted and adapted by the 2025/26
Code, for being satisfied that they give a true and fair view and for making
accurate representations to you. 
ii. I have complied with the requirements of all statutory directions affecting the
Council and Group and these matters have been appropriately reflected and
disclosed in the financial statements. 
iii. I have considered whether accounting transactions have complied with the
requirements of the Housing (Scotland) Act 1987 in respect of the Housing
Revenue Account. 
iv. The financial statements are free of material misstatements, including omissions. I
have reviewed and approved all audit adjustments made in the financial
statements. (See appendix 1 for details of such audit adjustments). 
Page 119 of 392

Page 120

Finance & Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley PA1
1JB www.renfrewshire.gov.uk 
PUBLIC
v. All prior year adjustments of which I am aware have been made to the financial
statements and these are appropriately disclosed in the financial statements.
(See appendix 1 for details of such adjustments). 
vi. I have reviewed and approved all disclosures made in the financial statements
and I am not aware of any other matters which require disclosure in order to
comply with the requirements of UK adopted international accounting standards,
as interpreted and adapted by the 2025/26 Code (A summary of the main
disclosure changes is at appendix 1). 
vii. No uncorrected misstatements were identified during the audit and the prior
years. 
viii. The Council and Group has complied with all aspects of contractual agreements
that could have a material effect on the financial statements in the event of non-
compliance. There has been no non-compliance with requirements of any
regulatory authorities that could have a material effect on the financial statements
in the event of non-compliance. 
ix. I acknowledge my responsibility for the design, implementation and maintenance
of internal control to prevent and detect fraud and error, and I believe that I have
appropriately fulfilled these responsibilities. 
x. I am satisfied that the methods, data and significant assumptions used by the
Council in making accounting estimates, including those measured at fair value,
are appropriate to achieve recognition, measurement and disclosure that is
reasonable in accordance with the 2025/26 Code. I am satisfied that the material
judgements used in the preparation of the financial statements are soundly based,
in accordance with the 25/26 Code and adequately disclosed in the financial
statements. I understand my responsibilities include identifying and considering
alternative methods, assumptions or source data that would be equally valid under
the financial reporting framework, and why these alternatives were rejected in
favour of the estimate used. There are no other material judgements that need to
be disclosed. 
xi. I confirm that all necessary information has been provided to our management
expert, as external valuers and the Council’s Estates team as internal valuers, to
ensure that the valuation of land and buildings and council dwellings and where
relevant right of use assets, is accurate and complete. The valuations of these
assets have all been prepared in accordance with the requirements of the 2025/26
Code. 
xii. I confirm that I am satisfied that the actuarial assumptions underlying the valuation
of pension scheme assets and liabilities for IAS19 Employee Benefits disclosures
are consistent with my knowledge. I confirm that all settlements and curtailments
have been identified and properly accounted for. I also confirm that all significant
post-employment benefits have been identified and properly accounted for. 
Page 120 of 392

Page 121

Finance & Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley PA1
1JB www.renfrewshire.gov.uk 
PUBLIC
xiii. The Council has satisfactory title to all assets disclosed in the accounts. The
Council has no plans or intentions that may materially alter the carrying value and,
where relevant, the fair value measurements or classification of assets and
liabilities as at 31 March 2026 reflected in the financial statements. 
xiv. The Council has complied with all aspects of ring-fenced grants that could have a
material effect on the Council and Group’s financial statements in the event of
non-compliance. 
xv. Except as disclosed in the financial statements:
a. there are no unrecorded liabilities, actual or contingent;
b. none of the assets of the Council has been assigned, pledged or mortgaged;
c. there are no material prior year charges or credits, nor exceptional or non-
recurring items requiring separate disclosure. 
xvi. Related party relationships and transactions have been appropriately accounted
for and disclosed in accordance with the requirements of applicable law,
accounting standards and the 2025/26 Code. 
xvii. All events subsequent to the date of the financial statements and which require
adjustment or disclosure have been adjusted or disclosed. 
xviii. Actual or possible litigation and claims have been accounted for and disclosed in
accordance with the requirements of UK adopted international accounting
standards, and as interpreted and adapted by the Code. 
xix. I believe that the Council and Group’s financial statements should be prepared on
a going concern basis. I do not expect the Council or Group to demise in its
current organisational form; however, my basis for going concern acknowledges
that if that situation arose the services would be transferred to another public
sector body. I believe that no further disclosures relating to the Council’s ability to
continue as a going concern need to be made in the financial statements. 
Information Provided
xx. I have provided you with:
a. access to all information of which I am aware that is relevant to the
preparation of the Council and Group’s financial statements such as
accounting records, and all other records requested;
b. additional information that you have requested from us for the purpose of your
audit; and
c. unrestricted access to persons within the Council (via remote arrangements
where necessary), from whom you determined it necessary to obtain audit
evidence. 
Page 121 of 392

Page 122

Finance & Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley PA1
1JB www.renfrewshire.gov.uk 
PUBLIC
xxi. I have communicated to you all deficiencies in internal control of which
management is aware. 
xxii. All transactions undertaken by the Council and Group have been recorded in the
accounting records and are properly reflected in the financial statements. 
xxiii. I have disclosed to you the results of my assessment of the risk that the financial
statements may be materially misstated as a result of fraud. 
xxiv. I have disclosed to you all information in relation to known fraud or suspected
fraud that I am aware of and that affects the Council or Group and involves:
a. management;
b. employees who have significant roles in internal control; or
c. others where the fraud could have a material effect on the financial
statements. 
xxv. I have disclosed to you all information in relation to instances of, or allegations of
fraud, or suspected fraud, affecting the financial statements communicated by
employees, former employees, analysts, regulators or others. 
xxvi. I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when
preparing financial statements. 
xxvii. I have disclosed to you the identity of the Council and Group’s related parties and
all the related party relationships and transactions of which I am aware. 
xxviii. I have disclosed to you all known actual or possible litigation and claims whose
effects should be considered when preparing the financial statements. 
xxix. I acknowledge our legal responsibilities regarding disclosure of information to you
as auditors and confirm that so far as I am aware, there is no relevant audit
information needed by you in connection with preparing your audit report of which
you are unaware. I have taken all the steps that I ought to have taken in order to
make myself aware of any relevant audit information and to establish that you are
aware of that information. 
Management Commentary
xxx. The disclosures within the Management Commentary fairly reflect my
understanding of the Council and Group’s financial and operating performance
over the period covered by the financial statements. 
Annual Governance Statement
xxxi. I am satisfied that the Annual Governance Statement fairly reflects the Council’s
risk assurance and governance framework and I confirm that I am not aware of
Page 122 of 392

Page 123

Finance & Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley PA1
1JB www.renfrewshire.gov.uk
PUBLIC
any significant risks or weaknesses in governance or internal control that are not
disclosed within the Statement.
Remuneration Report
xxxii. I am satisfied that the disclosures within the Remuneration Report have been
properly prepared in accordance with The Local Authority Accounts (Scotland)
Regulations 2014.
Wider Scope
xxxiii. I have made you aware of any issues that could affect your Wider Scope reporting
responsibilities, including any external or internal reports which highlight
weaknesses in our arrangements for securing economy, efficiency and
effectiveness in our use of resources.
Approval
The approval of this letter of representation was minuted by the Council at its meeting on 24
September 2026.
Yours faithfully
Signature:
Name: Alastair MacArthur
Position: Director of Finance and Resources
Date: 
Page 123 of 392

Page 124

Finance & Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley PA1
1JB www.renfrewshire.gov.uk 
PUBLIC
Appendix 1
Adjusted misstatements
Current year audit adjustments (Council and Group Accounts)
No Detail Comprehensive Income
and Expenditure
Statement
Balance Sheet  
Dr / (Cr)
£million
Dr / (Cr)
£million
1. To reverse incorrect reclassification
of one asset from Other Land and
Buildings to Infrastructure as the
asset remains separate to the land. 
11.900
(11.900) 
2. To write down nil net book value
asset that cannot be verified by the
Council. 
4.439
(4.439) 
Net impact on reserves –
increase / (decrease)
- - 
Total reserves per the unaudited
financial statements (Group)
1,887.779 1,887.779 
Revised reserves per the audited
financial statements (Group)
1,887.779 1,887.779 
Common Good 
No Detail Comprehensive Income
and Expenditure
Statement
Balance Sheet  
Dr / (Cr)
£’000
Dr / (Cr)
£’000
1. Common Good – Renfrew 
Understated short-term deposits
and revaluation reserve fixed assets 
434
(434) 
Net impact on reserves –
increase / (decrease)
- - 
Misclassification and disclosure changes - Adjusted 
No Detail 
1. Minor presentational, formatting and disclosure issues. 
We proposed a number of minor changes and narrative amendments to improve
the presentation of the accounts including a change to comparative figures.
2. Updated Note 4: Expenditure and income analysed by nature to match with
supporting evidence. 
Page 124 of 392

Page 125

Finance & Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley PA1
1JB www.renfrewshire.gov.uk 
PUBLIC
No Detail 
3. Updated Note 25: Related parties to provide further clarity on the classification of
the remaining balance and updated figure to match with supporting evidence.
4. Updated Note 6: Adjustment between accounting basis and funding basis under
regulations and Note 8: Capital Adjustment Account movement due to incorrect
treatment of a reserve drawdown in the year. 
5. Updated Note 22: Nature and extent of risks arising from Financial Instruments -
Credit risk -  Sundry Income Debt Past Due, to match with the supporting evidence 
6. Updated exit package cost disclosure- one employee moved from the £300,001 to
£350,000 band to the £350,001 to £400,000 band. 
Prior year adjustments 
• Restatement of PPE note: Following a review of the Council's asset componentisation
policy under the CIPFA Code of Practice, certain assets previously recorded within
Vehicles, Plant, Furniture and Equipment have been reclassified to Council Dwellings
or Other Land and Buildings. This change reflects the assessment that these assets
are building components forming part of the properties, rather than separate plant or
equipment assets.
• Restatement of Common Good Funds Paisley and Renfrew Income and expenditure
statement: During 2024/25, following a review of historical title and legal advice, the
Council reclassified £1.090m of property from Council assets. This was reflected in the
reserves balance directly in the prior year. However, it should have been recorded as
income in the prior year. 
• Restatement of Group accounts: Upon receiving the audited accounts of the Group's
components, the consolidation was revised to incorporate the final audited figures.
Page 125 of 392

Page 126

Page 126 of 392

Page 127

1
PUBLIC
___________________________________________________________________
To: Council
On: 24 September 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Audited Annual Accounts 2025/26 - Renfrewshire Council Group
___________________________________________________________________
1. Summary
1.1 The 2025/26 unaudited Annual Accounts were approved by Council on 22
June 2026. Each year the Council’s appointed external auditors carry out
an audit of the Council’s financial statements and provide an opinion as to
whether those statements provide a true and fair view of the financial
position of the Council, and its income and expenditure for the year; and
also whether they have been prepared in accordance with the relevant
regulations.
1.2 The audited annual accounts are now presented for members’ noting and
further recommendation to the Council that the audited accounts be
approved.
1.3 There were three material adjustments made to the annual accounts over
the course of the audit, along with other presentational and disclosure
changes. These are detailed in Azets’ Annual Audit report, presented at
agenda item 1.
___________________________________________________________________
2. Recommendations
2.1 The Council is asked to approve the attached audited Annual Accounts
2023/24 for signature in accordance with the Local Authority Accounts
(Scotland) Regulations 2014.
Item 3
Page 127 of 392

Page 128

2
___________________________________________________________________
Implications of the Report
1. Financial – The 2025/26 Annual Accounts demonstrate that the Council
continues to operate services within the resources available, and in line with
the relevant legislation.
2. HR & Organisational Development – none directly arising from this report.
3. Community/Council Planning – none directly arising from this report.
4. Legal – An audit opinion free from qualification demonstrates the Council’s
compliance with the statutory accounting requirements set out in the Local
Government (Scotland) Act 1973 and the Local Government in Scotland Act
2003.
5. Property/Assets – none directly arising from this report.
6. Information Technology – none directly arising from this report.
7. Equality & Human Rights – none directly arising from this report.
8. Health & Safety – none directly arising from this report.
9. Procurement – none directly arising from this report.
10. Risk – none directly arising from this report.
11. Privacy Impact – none directly arising from this report.
12. Cosla Policy Position – none directly arising from this report.
13. Children’s Rights – none directly arising from this report.
14. Climate Risk – none directly arising from this report.
___________________________________________________________________
Author:           Christine McCourt, Head of Finance and Procurement
PUBLIC
Page 128 of 392

Page 129

Page 129 of 392

Page 130

1
PUBLIC
Contents
Management Commentary ................................ 2
Statement of Responsibilities .......................... 17
Annual Governance Statement ........................ 18
Remuneration Report ...................................... 29
Independent Auditor’s Report  ......................... 36
Comprehensive Income and Expenditure
Statement ...................................................... 40
Movement in Reserves Statement .................... 42
Balance Sheet................................................. 43
Cashflow Statement ........................................ 44
Note 1: Expenditure and Funding Analysis......... 45
Note 2: Financing and investment income &
expenditure .................................................... 47
Note 3: Taxation and non-specific grant income 47
Note 4: Expenditure and income analysed by
nature ............................................................ 47
Note 5: Grant income ...................................... 48
Note 6: Adjustment between accounting basis and
funding basis under regulations ....................... 49
Note 7: Usable reserves ................................... 50
Note 8: Unusable reserves ............................... 53
Note 9: Property, Plant and Equipment ............. 57
Note 10: Heritage Assets ................................. 60
Note 11: Assets held for sale ............................ 60
Note 12: Intangible assets ............................... 60
Note 13: Capital expenditure and capital financing
...................................................................... 61
Note 14: Service Concession Arrangements...... 62
Note 15: Leases .............................................. 64
Note 16: Inventories ........................................ 64
Note 17: Cash and cash equivalents ................. 65
Note 18: Debtors ............................................. 65
Note 19: Creditors .......................................... 66
Note 20: Provisions ......................................... 66
Note 21: Financial Instruments ........................ 67
Note 22: Nature and extent of risks arising from
Financial Instruments ..................................... 71
Note 23: External audit costs ........................... 74
Note 24: Agency services ................................. 74
Note 25: Related parties .................................. 75
Note 26: Pension schemes accounted for as
defined contribution schemes ......................... 77
Note 27: Defined benefit pension schemes ....... 77
Note 28: Contingent liabilities .......................... 83
Note 29: Events after the balance sheet date .... 83
Note 30: Accounting Standards Issued not
Adopted ......................................................... 83
Note 31: Accounting Policies – Renfrewshire
Council .......................................................... 84
Note 32: Judgements in Applying Accounting
Policies .......................................................... 96
Note 33: Assumptions made about the future .. 97f
Common Good Funds ..................................... 98
Housing Revenue Account .............................. 100
Council Tax Income Account .......................... 102
Non-Domestic Rates Income Account ............ 104
Group Accounts ............................................ 105
Notes to the Group Accounts .......................... 108
Group Accounting Policies ............................. 120 
Page 130 of 392

Page 131

2
PUBLIC
Management Commentary 
The purpose of the Management Commentary is to
present an overview of Renfrewshire Council’s
performance during the 2025/26 financial year and to
help readers understand its financial position at 31
March 2026. In addition, it outlines the main issues
and risks that may impact the performance of the
Council in the future. 
Renfrewshire Council, one of 32 local authorities in
Scotland, was established by the Local Government
(Scotland) Act 1994 and came into being on 1 April
1996. It serves a population of 189,170, with a mix of
larger urban centres and smaller villages.   
The Council works closely with the Renfrewshire
Health and Social Care Partnership, which delivers
adult care services across the region; and with
OneRen, which delivers leisure and cultural services. 
These partners are part of the Council’s wider Group,
with partnerships spanning a number of
organisations to varying degrees, as follows: 
During 2025/26, Renfrewshire Council was organised
into four services, as follows: 
The services that the Council provides include: 
Environment, Housing and Infrastructure
Includes the management of roads and
transportation, housing services, public
protection, waste, neighbourhood services,
fleet, facilities management and
sustainability. 
Finance and Resources
Provides services such as legal, HR, ICT and
finance, to elected members and other parts
of the Council, as well as services to the
public, including council tax, and customer
and advice services.
Children's Services
Responsible for schools and education
services,  children and family social work,
and justice social work services.
Chief Executive's Service
Responsible for the development of corporate
policy, as well as partnerships, social
inclusion, planning, economic development,
regeneration, communications and
marketing.
Page 131 of 392

Page 132

3
PUBLIC
Our Aims and Objectives 
The aims of the Council Plan 2022-2027 were
revised during 2024 with a refreshed Community Plan
and a new Council Plan. The Community Plan is
Renfrewshire’s Local Outcomes Improvement Plan,
and the Council works with local partners to achieve
a Renfrewshire that is Thriving, Well, Fair and Safe. 
The Council’s vision to 2027, as described in the
Council Plan is:
The five strategic outcomes, which the Council is
working with partners, communities, and businesses
to deliver, and one cross-cutting theme that
underpins the delivery of these outcomes, are:
Place: Working together to enhance wellbeing
across communities
Economy: Building an inclusive, green, and
resilient economy
Fair: Nurturing bright, happy, and healthy
futures for all
Green: Leading Renfrewshire to Net Zero
Living Our Values: Making a difference
together
Improving outcomes for Children and
Families: Cross-cutting 
Aligned to our Council Plan is our transformation
programme, Reshaping Renfrewshire, which explores
how we can continue to deliver our vision, as
articulated in the Council Plan, within the context of
the financial challenges facing local authorities in
Scotland. At its heart are the two goals of ensuring a
financially sustainable long-term future and
improving outcomes for our communities. 
Each of the four Council services prepares a Service
Improvement Plan, demonstrating how they will each
contribute to the delivery of the Council Plan. Work is
underway to refresh the Community Plan and the
Council Plan for 2027-2032. 
Financial Strategy 
The financial strategy and service plans of the
Council support the delivery of the Council’s
priorities outlined in the Council Plan. To achieve this,
the financial strategy must ensure that resources are
effectively and efficiently used in line with overall
objectives; and ensure that resources are managed
sustainably and in a way that continues to ensure the
stability of service delivery. 
The medium-term Financial Outlook was reported to
the Council on 25 September 2025, with a further
update on 26 February 2026. These reports highlight
the continued challenging financial and economic
environment the Council is facing, predominantly
linked to high levels of cost growth, coupled with
lower real terms income growth. 
The Council’s medium-term financial outlook
continues to be based on an assumed flat-cash
revenue settlement over the short term; this, coupled
with significant cost pressures, particularly around
pay inflation, is the principal driver for the challenging
financial outlook. 
On 26 February 2026, the Council decided to
increase council tax for 2026/27 by 7.5%. At that
time, it was reported to Council that it is estimated to
be facing a £40m funding gap over the period to
2028/29, before any decisions on council tax.  The
Council therefore continues to target cost reductions
and savings of around £20m over the medium term,
and financial sustainability and stability risks remain
high going into 2026/27. It should be noted that these
forecasts do not include the potential impact of any
additional Council support for the Renfrewshire
Health and Social Care Partnership, whose financial
Page 132 of 392

Page 133

4
PUBLIC
outlook creates a significant financial risk for the
Council. Further detail is provided later in the
Financial Outlook and Key Risks section. 
Information on the year-end financial position of the
Council at 31 March 2026 is detailed in the Financial
Performance section. 
Review of the Year 
The Council reports on its progress delivering the
Council Plan every six months, and the most recent
report can be found here. We also publish an annual
Public Performance Report, which gives residents an
overview of how the Council performs in relation to its
key priorities, and how we perform across the 108
indicators included in the Local Government
Benchmarking Framework (LGBF). 
A detailed report on Renfrewshire’s performance
against the LGBF indicators is considered by our
Audit, Risk and Scrutiny Board every six months.
Some of the key achievements we have reported on
during 2025/26 are detailed below under each of our
strategic themes. 
Key Achievements 2025/26
Place:
Our new river crossing – the Renfrew bridge opened in
May 2025, connecting communities on either side of
the Clyde.  The bridge has quickly proved to be a vital
transport link, with 3.5 million journeys being
recorded within the first year of opening.
Our town centre regeneration plans are progressing,
with a new Vision for Johnstone developed,
construction underway for a new civic square in
Erskine, designs being produced for the
transformation of the former Brown Institute site in
Renfrew, and some initial designs for landscape
enhancements in the Linwood Lade area being
prepared.
Economy:
We have continued to support our young people into
post-school positive destinations and now have the
second highest percentage of positive leaver
destinations in Scotland, with 97.9% of our school
leavers continuing with education, or moving into
training or employment.
The Events Programme for 2025 exceeded targets
across all key performance indicators. Events
delivered across the year included new events in
Renfrew, Erskine, and Linwood as a result of a
broader ‘five towns’ approach within the new events
strategy, and new community events partnership
group. The events programme generated an
estimated £4.5m in economic impact.
The Council’s Procurement and Economic
Development teams continue to work together to
support local businesses to bid for Council contracts
and related work.  A draft Local Supply Chain
Engagement Strategy has been developed and aims
to strengthen engagement with Renfrewshire’s
business community, increase local supplier
participation in public procurement, and improve
supplier awareness, capability and readiness for
public sector opportunities.  
Fair:  
A new round of participatory budgeting was delivered
specifically for Council tenants.  In its first year,
£150,000 was made available for Renfrewshire
residents to suggest projects that would improve
local neighbourhoods, with tenants then voting on
those to be funded.  This was the first of a three-year
programme with £600,000 to be distributed in total.
Attainment figures for this year show that the poverty-
related attainment gap has narrowed for both literacy
and numeracy, and this continues to be a priority for
the Council.
The Council and its partners continue to work
together to progress the Fairer Renfrewshire
Programme, with a strong shared focus currently on
the local response to cost-of-living inequality.  A
Fairer Renfrewshire Action Plan, agreed by the
Leadership Board in December 2025, sets out the
priority actions that will be progressed to tackle
poverty and inequality in Renfrewshire.
Green:  
Our Carbon Management Plan 2025-2030 was
developed, setting out how we intend to reduce our
emissions over the next five years.  Renfrewshire
Council already performs strongly relative to other
Page 133 of 392

Page 134

5
PUBLIC
local authorities in relation to emissions from
electricity, gas and transport, as reflected in
performance measures included in the Local
Government Benchmarking Framework.
We are participating in a regional approach to Electric
Vehicle Charging, working with neighbouring
authorities on procuring infrastructure.
We invested £15m during the year to improve the
energy efficiency of our housing stock through
improved insulation, new triple glazing and solar
panels.
Living Our Values:
As part of our focus on Best Value, the Council was
subject to a Controller of Audit Best Value Report
which was published in summer 2025. This was a very
positive report, with no formal recommendations for
the Council.  ‘Areas of focus’ identified by the
Accounts Commission have been added to the
Corporate Improvement Plan and were detailed in a
report to Council on 26 June 2025. A progress report
was taken to the Leadership Board in September and
work continues across all elements of the
improvement agenda.
We continue to have a strong focus on employee
wellbeing, Initiatives in 2025/26 included the delivery
of Men’s Mental Health awareness events in our
Underwood Road depot, a series of ‘RenTalks’ for
staff covering issues as varied as advice on personal
finances and on raising teenagers, updated HR
policies on equality, diversity and inclusion and
respect at work, and the continued provision of
services such as Time for Thriving.
We carried out an extensive programme of
engagement with local residents; over 1,000 people
took part in interview-led surveys on perceptions of
local services and Council priorities, and this was
supplemented with an online survey and focus
groups.  We used the findings to create an action plan
and intend to repeat the exercise in future years, as
part of our ongoing commitment to improving our
dialogue with residents and communities through
future engagement opportunities.
Improving Outcomes for Children and
Young People:
Construction is nearing completion on the Paisley
Grammar School Community Campus and it will
welcome pupils in August for the new 2026/27 school
year.  A programme of engagement activities on the
next steps of our Learning Estate Strategy is planned
for the remainder of this year. 
The Promise continues to be embedded within
service planning and delivery through our active and
expanding Promise Keeper network. There are
currently 407 Promise Keepers working across the
local authority - comprising staff, elected members,
the HSCP, and partner agencies. The Keep The
Promise in Renfrewshire Action Plan 2026–29
provides the route map for the next phase of
implementing The Promise. 
Performance Indicators 
Our Council Plan is one way in which we report to
elected members and Renfrewshire residents on our
performance. The Council Plan reports on 34
indicators, of which 21 have a target. 
In 2025/26, 13 of our indicators met or exceeded their
target, two narrowly missed the target, and two were
behind target. There are four indicators for which
2025/26 data is not yet available. 
Council services also track additional performance
indicators through their Service Improvement Plans.
In 2025, the Council established an officer
Performance Board to provide additional senior
scrutiny over Council-wide performance.  The board
supports intensive improvement work and cross-
Council working, and in its first year has had a
particular focus on planning and building standards,
customer interactions, and staff absence.  This
approach has allowed improvement plans to be
developed and delivered in short time frames and is
anticipated this will positively impact performance
indicators in 2026/27.
Our areas of strong performance include:
• Supporting people into sustained employment;
• Supporting new business start-ups;
• Reducing CO2 emissions from public lighting;
Page 134 of 392

Page 135

6
PUBLIC
• Completing homeless duties within our target
timescales;
• Uptake of free school meals in primary schools;
• Providing community-based placements for
Looked After Children.
Other areas where LGBF data indicates we have
strong relative performance include:
•  pupil attainment at levels 5 and 6 and in
numeracy at primary school level; 
• hospital readmissions and delayed discharges; 
• the condition of Class A and B roads; 
• rent arrears; 
• the time taken for non-emergency housing repairs; 
• financial sustainability measures; and 
• CO2 emissions from electricity, gas, and
transport.  
Areas for Improvement and Development
We narrowly missed our annual targets in the
following areas:
• The percentage of Council housing meeting
Scottish Housing Quality Standards; and 
• The percentage of LGBF indicators where
Renfrewshire Council’s performance is in the top
half of Scottish Councils.    
There are two measures which are further behind
target - one relates to affordable housing and is partly
due to a change in how funding is being used, and the
other is in relation to staff sickness absence, with a
council-wide programme of work underway to
address this.
The Local Government Benchmarking Framework
(LGBF) provides an opportunity for Scottish local
authorities to consider their performance relative to
other councils.  The latest LGBF data relates to
2024/25, and although the Improvement Service have
noted that the pace of improvement is slowing across
the whole sector, Renfrewshire Council has improved
performance on 58 out of the 92 available indicators,
and increased the proportion that rank in the top 8
best performing councils.  Longer-term trends show
that improvements in 79% of all measures since the
LGBF began, and this is a higher proportion than any
of our Family Group comparator councils.  
The chart below shows the trend in performance –
both absolute and relative to other councils – in the
years since the pandemic. 
Page 135 of 392

Page 136

7 
Annual Accounts 2025/26 PUBLIC
General performance information can be found on
the Council’s website at the following path: Your
Council>Information, performance and
statistics>Council Performance.
LGBF data can be found at: Your
Council>Information, performance and
statistics>Council Performance>Benchmarking. 
Working Towards Net Zero by 2030
Renfrewshire Council’s Public Bodies Climate
Change Duties reported a 4.27% emissions reduction
compared with the previous year, and overall annual
emissions reduction of 66.23% against the 2012/13
baseline.
In November 2025, Renfrewshire Council’s Carbon
Management Plan 2025-2030 was approved and
published. The Plan sets out several projects across
key service areas which will contribute to significant
reduction in emissions over the next 5 years. These
areas include Waste, Transport, Utilities, Street
Lighting and Business Travel.
Continued activity includes delivering change across
Council operations, and large-scale projects with
local benefits aligned to the five themes of
Renfrewshire’s Plan for Net Zero, which are Clean
Energy, Sustainable Transport, Circular Economy,
Connected Communities and Resilient Place. Further
detail of activity within each theme is set out in the
following sections.   
Clean Energy:
• The Council is developing outline business cases
for two potential district heat networks DHN):
one in Paisley, and one extending the existing
AMIDS DHN to Glasgow Airport. DHNs strongly 
support clean energy solutions and reduced
emissions on a large scale. 
• Year 1 of the project to upgrade and expand
Building Management systems (BMS) across
public buildings has been completed. This will
support more energy efficient buildings and
practices and reduce the Council’s emissions as
a result. Year 2 projects will look at further BMS
improvements and solar array expansion.
• Development of the new Paisley Grammar
Community Campus is nearing completion and
has been built to Passivhaus standard,
maximising clean energy supported by air source
heat pump heating, and solar array.
Sustainable Transport:
• The project to accelerate the delivery of public EV
Charging Infrastructure, aiming to install over
3,000 additional charge points over the coming
years in collaboration with the Glasgow City
Region, has progressed to procurement stage to
appoint a new Charge Place Operator to take this
work forward.
• Continued use of hydrotreated vegetable oil
(HVO) as alternative fuel for bin lorries and large
fleet, reducing CO2 emissions by up to 90% and
contributing to improved air quality. This is a
commitment in the Council’s approved Carbon
Management Plan.
Circular Economy:
• Exploring opportunities to maximise recycling,
building on successful recycling initiatives across
the school estate. An initial public buildings
project is close to completion on the
implementation of full recycling facilities within
Renfrewshire House, followed by Underwood
Road Depot.
Resilient Place:
• The development of an Adaptation Plan for
Renfrewshire is underway supported by
extensive engagement, which has taken place
with internal services and external stakeholders.
Once drafted, the plan will be opened for public
consultation prior to being finalised.
• Nature Restoration projects continue to be
delivered including Restoring Renfrewshire Rivers
and Biodiversity Action in Renfrewshire. Potential
biodiversity sites that maximise biodiversity
related benefits, in line with Nature Network
corridors, are currently being identified.
Page 136 of 392

Page 137

8 
Annual Accounts 2025/26 PUBLIC
Gender Pay Gap 
The gender pay gap is the difference between the average hourly rates of pay of men and women expressed as a
percentage, where a positive figure indicates that women are paid less than men. A negative figure indicates that
women are paid more than men. The gender pay gap is different from equal pay, which is a direct comparison of
two people or groups carrying out the same or an equivalent role. At 31 March 2026, the mean gender pay gap for
Renfrewshire Council was -0.81% in favour of female (-0.52% at 31 March 2025). 
Key Financial Ratios
The following tables provide information regarding the financial performance of the Council in 2025/26 and the
affordability of its ongoing commitments:
Mean gender pay gap
in hourly pay
-0.81%
Mean hourly salary   
£22.33  £22.15
Female  Male
Workforce demographics 
73.45%  26.55%
Female  Male 
Employee Head Count 
6,373  2,304
Female  Male
Page 137 of 392

Page 138

9 
Annual Accounts 2025/26 PUBLIC
2024/25
Estimate Actual Actual
Reserves
Uncommitted General Fund
reserves as a % of budgeted net
expenditure
1.8% 2.0% 1.9% Reflects the level of funding available to meet
unplanned expenditure and manage financial
risk
Movement in uncommitted
General Fund balance
n/a 9.7% 0.0% Reflects contribution to Unallocated balance
in-year
Council Tax
In-year collection rate 95.0% 94.7% 94.5% Reflects the Council’s effectiveness in
collecting Council Tax debt
Council Tax income as a
proportion of total taxation and
non-specific grant income
18.5% 18.5% 18.3% Reflects the Council’s ability to vary
expenditure by raising Council Tax, the
principal local authority controlled source of
finance
Debt/Long term borrowing
Capital Financing Requirement
(CFR)
£697.0m £650.9m £599.6m
External debt £492.0m £417.2m £397.7m
Ratio of financing costs to net
revenue stream (General Fund)
2.7% 2.8% 2.9%
Financial Indicator 2025/26 Commentary
The information is this section demonstrates
that the level of external debt (driven by the
capital programme) is affordable, owing to the
low proportion of our budget spent on
servicing debt. Further information, including
descriptions of these terms and their
significance, is available in the Treasury
Management Annual Report, presented to the
June Council meeting each year.
Financial Performance 
Primary Financial Statements 
The annual accounts summarise the Council’s
transactions for the year, its financial position at 31
March 2026, and its cashflows. The annual accounts
are prepared in accordance with the International
Accounting Standards Board Framework for the
Preparation and Presentation of Financial Statements
as interpreted by the Code of Practice on Local
Authority Accounting in the United Kingdom (“the
Code”). 
The Primary Financial Statements include the
Comprehensive Income and Expenditure Statement
(CIES), Movement in Reserves Statement (MIRS),
Balance Sheet and Cashflow Statement. These
statements are accompanied by notes to the
accounts, which provide more details on the figures
shown in the statements and set out the accounting
policies adopted by the Council. There are also
separate statements for Council Tax, Non-Domestic
Rates, the Housing Revenue Account and the
Common Good Funds. 
The Comprehensive Income and Expenditure
Statement (CIES) presents the total cost of providing
Council services in 2025/26 along with the income
available to fund those services. 
The outturn explained in the following section differs
from the accounting deficit shown in the CIES due to
accounting adjustments required to comply with
proper accounting practice, but which under statute
should not impact on local taxpayers. A
reconciliation of these figures can be found in Note 1:
Expenditure and Funding Analysis. 
General Fund 
The General Fund is funded by government grant and
Council Tax revenues, and the Council is also able to
Page 138 of 392

Page 139

10 
Annual Accounts 2025/26 PUBLIC
apply usable reserves from the General Fund Balance
to fund expenditure. 
As mentioned previously, the Council’s medium-term
Financial Outlook highlights the continuing
challenging financial and economic environment the
Council is facing, linked to inflation, coupled with
slower income growth. 
For the General Fund in 2025/26, increases in waste
costs, high inflation on vehicle parts and specialist
contractors, and public building repairs, have
featured in regular budget monitoring reports
throughout the financial year. Further pressures
emerged through the year relating to children’s social
care, and staffing costs within schools. These
pressures have been offset by increased investment
income, additional funding relating to packaging
waste disposal, and an underspend in loan charges
budgeted for the learning estate, culminating in an
overall service underspend against budget of
£0.191m (0.03%). 
The Council’s largest category of spend is staffing, so
naturally any pay settlement linked to high levels of
inflation will create a further cost pressure. In
2025/26 a two-year national pay settlement was
agreed for local government workers, of 4.0% for
2025/26 and 3.5% for 2026/27. In recognition of the
challenging financial environment, the Scottish
Government provided councils with additional
funding to support this pay settlement in 2025/26. For
Renfrewshire, this amounted to £2.6m. 
Adult social care had a planned year-end deficit of
£5.7m, which decreased the reserves of the
Renfrewshire Health and Social Care Partnership,
who operate these services. As this reserve
drawdown does not affect the Council’s General
Fund balance, it is shown as a break-even position in
the table below 
The Council fell just short of its target in-year council
tax collection rate of 95% in 2025/26, returning a
creditable 94.7%, which was an improvement on the
2024/25 collection rate. Income from Council Tax
marginally over-recovered by £0.005m. 
After adjusting for this over-recovery in Council Tax
revenues, the final position for the Council’s General
Fund balance at 31 March 2026 was an underspend
of £0.196m.
Revised Budget Actual Variance
£m £m £m
Chief Executive's Service 30.217 30.195 0.022
Children's Services 273.812 275.837 (2.025)
Environment, Housing and Infrastructure 78.346 78.047 0.299
Finance and Resources 51.124 50.893 0.231
Miscellaneous Services 19.907 18.243 1.664
Adult Services 112.122 112.122 0.000
Net Expenditure 565.528 565.337 0.191
Revenue Support Grant (368.933) (368.933) 0.000
Council Tax Income (108.199) (108.204) 0.005
Non-Domestic Rates Income* (108.844) (108.844) 0.000
Funding (585.976) (585.981) 0.005
Contribution to General Fund Balances (20.448) (20.644) 0.196
2025/26
*The Council collected £101.7m directly from local businesses with £7.1m due from the Scottish Government National Non-
Domestic Rates Pool. 
Page 139 of 392

Page 140

11 
Annual Accounts 2025/26 PUBLIC
The Council’s Reserves 
The Council holds the following balances in reserve.
Further details can be found in Note 7: Usable
reserves. 
As at 31
March 2025
Usable Reserves
As at 31
March 2026
£m £m
138.769 General Fund Balance 159.414
6.933 Housing Revenue Account 7.973
5.485 Capital Receipts Reserve 4.122
84.008 Other Statutory Funds 65.905
235.195 Total 237.414 
The General Fund balance of £159.4m will be carried
forward to 2026/27. Of this balance, £147.9m has
been earmarked for a particular purpose, as outlined
in Note 7: Usable reserves. This leaves unallocated
reserves of £11.5m (2.0% of the Council’s net annual
running costs), which is in line with levels agreed by
the Council under its revised financial planning
principles. 
It is viewed that this balance is appropriate to the
financial risk environment the Council is facing, in
order to mitigate adverse risks anticipated in public
finances over the short to medium term. 
Housing Revenue Account 
The balance on the Housing Revenue Account (HRA)
as at 31 March 2026 has increased to £7.9m. This
remains a prudent level of unallocated reserves for
the HRA to mitigate the impact of any unforeseen
risks and to provide an element of mitigation against
forecast pressures related to the prevailing economic
climate. 
The year-end break-even position was arrived at after
some budget variances were experienced in-year.
Property repairs and maintenance, including voids
management, significantly overspent; however, this
was offset by lower capital charges and increased
interest receivable following higher interest rates over
the year, allowing a contribution to reserves of £1.0m. 
Infrastructure Assets 
The Scottish Government published a Statutory
Override in August 2022, which has been extended to
allow councils to continue the current accounting
treatment for Infrastructure assets until 31 March
2027. Further detail is provided at Note 9. 
Capital and Borrowing 
Renfrewshire Council continues to make significant
capital investment in council housing, schools,
culture, roads and the town centre estate. On 27
February 2025, the Council approved the housing
capital investment programme for 2025/26 of £56m;
and the General Fund capital investment programme
for 2025/26 of £129m. 
The capital investment programmes were affected by
the availability of contractors, the complexity of
refurbishment and construction works as well as high
levels of inflation impacting construction costs and
professional fees. Programmes have therefore been
re-profiled during the year to reflect revised
timescales of individual projects, or where project
completion dates have been delayed, resulting in
actual capital spend for the year of £44m for housing
capital investment and £111m for the General Fund.
Further detail is provided in Note 14: Capital
expenditure and capital financing. 
The following charts show the actual expenditure
incurred and income received in relation to the
2025/26 capital programme. 
Page 140 of 392

Page 141

12 
Annual Accounts 2025/26 PUBLIC 
During the course of 2025/26 there was £64m of
new long-term external borrowing to support the
capital programme. The level of cash balances
available to the Council remains consistent with
daily cash requirements, treasury and capital
investment plans. The increase in cash balances
compared to 31 March 2025 is attributable in part
to receipt of grant funding for the AMIDS South
project late in the financial year. 
The Council’s borrowing strategy is prepared in
accordance with the Code of Practice on Treasury
Management in Local Authorities. The majority of
the Council’s borrowing comes from the Public
Works Loan Board with the remainder from market
and other loans. Further details are provided in
Note 21: Financial Instruments. 
The Council regulates its capital spending limits
within a prudential framework recommended by
CIPFA and endorsed by the Scottish Government.
Each year, the Council sets its capital financing
requirement (CFR) for the forthcoming year in its
Treasury Management Strategy Statement (TMSS),
approved by the Council on 27 February 2025 with
a mid-year update on 11 December 2025. The TMSS
for 2025/26 can be found on the Council
Committee Management Information System at:
http://renfrewshire.cmis.uk.com. 
The CFR is a prudent assessment of the aggregate
external borrowings for capital investment
purposes that are affordable and sustainable over
the longer- term. The actual CFR at 31 March 2026
was £650.9m, within the approved Authorised Limit
of £702.0m. The Council’s external borrowings
have only been applied for capital investment
purposes, with the Council’s net external debt
being £417.2m at 31 March 2026 compared to the
approved Operational Boundary of £674.0m. The
Council’s costs of borrowing remain one of the
lowest of all Scottish local authorities, are
affordable, and align to the Council’s medium to
long-term financial strategy. It is anticipated that
borrowing costs as a proportion of net revenues will
increase in future years as planned investment,
predominantly in the learning estate, is completed. 
The Council’s non-housing financing costs were
2.8% as a proportion of the Council’s non-housing
net revenue stream. Housing related financing
costs as at 31 March 2026 were 19.5% of net
Page 141 of 392

Page 142

13 
Annual Accounts 2025/26 PUBLIC
housing revenues, lower than the budgeted level of
24.5%. 
Net Pension Position
The disclosure requirements for pension benefits
under IAS19 are detailed in Notes 27 and 28. The
appointed actuaries, have confirmed an increase of
£109m in their assessment of the Council’s share
of the actuarial position of the local government
pension fund as at 31 March 2026. This is largely
attributable to the corporate bond yield (upon
which the pension discount rate is derived) having
risen over the past year, which served to reduce the
employer's pension obligations and led to the gain
on the balance sheet. 
The assessment provides only a snapshot as at 31
March 2026 and necessarily changes on a day-to-
day basis to reflect stock market movements in
particular. The appointed actuaries remain of the
view that the asset holdings of the Strathclyde
Pension Scheme and the contributions from
employees and employers provide sufficient
security and income to meet future pension
liabilities. 
Accounting rules require that a cap is placed on the
value of a pension asset that can be reported in the
Balance Sheet. For 2025/26, this has adjusted the
value of the pension asset shown in the balance
sheet from £865m to nil. The value of Unfunded
liabilities at the same date is £64m. 
A potential change to pension rules is outlined in
Note 28: Contingent liabilities; however, this has
not been reflected in the pension liability reported
in the Balance Sheet. 
Provisions and Contingencies
The Council has provided for eventualities which
may have a material effect on the financial position
of the Council. The reasons for the provisions made
are outlined in Note 20: Provisions. In general, any
contingent liabilities known to the Council are
covered by insurance arrangements. As outlined at
Note 7, the Council has also set aside £3.2m for
uninsured claims. Any contingencies that cannot
yet be accurately quantified are outlined in Note
28: Contingent Liabilities. 
The Renfrewshire Council Group 
Local authorities are required to prepare Group
Accounts in addition to their own Council’s
accounts where they have a material interest in
other organisations. The Group Accounts
consolidate the results of the Council with five
subsidiaries:
• Renfrewshire Leisure Limited, trading as
OneRen;
• the Common Good Funds;
• the Coats Observatory Trust;
• Park Lane Developments (Renfrewshire) LLP;
and
• Paisley Museum Reimagined Limited.
The Group Accounts also consolidate the Council’s
share of five other entities treated as associates or
joint ventures:
• Strathclyde Partnership for Transport;
• Strathclyde Concessionary Travel Scheme Joint
Committee;
• Renfrewshire Valuation Joint Board;
• Renfrewshire Health and Social Care Integration
Joint Board; and
• AMIDS Renfrewshire LLP.
The Council has non-material interests in a number
of other entities namely Scotland Excel; and
Glasgow City Region – City Deal Cabinet. 
Financial Outlook and Key Risks 
Financial Sustainability
The Financial update reports throughout 2025/26
outlined continued uncertainty for local
government finances. In 2020, the Council agreed
Page 142 of 392

Page 143

14 
Annual Accounts 2025/26 PUBLIC
to replenish unallocated reserves to a threshold of
£10m in order to address the risks of significant and
unplanned cost pressures that may emerge over
the medium term. In light of expected energy and
food price volatility in the short term, a further £1m
has been contributed in 2025/26. 
The Council continued to feel the impact of global
political and economic change during 2025/26, and
though general inflation did reduce from its peak of
3.8% (CPI) in summer 2025, it increased again in
March 2026 to 3.3%. 
The Scottish Government most recently published
its Medium Term Financial Strategy (MTFS) on 25
June 2025, outlining its potential spending and
funding position over the subsequent 5 years. The
MTFS outlined a growing financial gap for the
Scottish Government, with spending pressures are
expected to outstrip the resources and an
estimated funding gap of £4.7 billion by 2029/30.
The outlook for the local government settlement is
likely to face real terms cuts over the Spending
Review period. 
As outlined in the Revenue Estimates 2025/26
report to Council in February 2025, after adjusting
for new responsibilities, areas of growing
responsibility and other conditional aspects of the
settlement to provide a like-for-like comparison to
2025/26, the underlying core grant for Renfrewshire
Council increased by £9.9m (2.3%). Following the
Council meeting, the Scottish Government
announced further funding to help offset the rise in
employers' National Insurance from 1 April 2025.
Renfrewshire’s share of this funding was £4.793m. 
Existing service and cost pressures arising from pay
settlements, demographic and socio-economic
factors will continue to play a major role in driving
spending pressures for the Council; however, the
predominant focus of the Council will be
addressing its projected medium-term funding gap. 
As reported to the Council in February 2026, the
central forecast is a financial gap of £40m by the
end of 2028/29, before any decisions on council tax
increases. 
The Council continues to mitigate treasury risks,
including those associated with the security of
cash deposits, by actively considering debt
restructuring as outlined in the Council's agreed
Treasury Management Strategy. The Council also
continually reviews, in consultation with its
treasury advisors, the criteria for placing deposits
with financial institutions on the Council’s
approved counterparty list. 
As part of the Council’s treasury strategy, it
continues to utilise internal cash balances,
deferring or minimising external borrowing with the
dual objectives of reducing the level of cash
deposits held by the Council, whilst generating
ongoing savings in net interest costs. This strategy
is monitored carefully in order to ensure that the
Council retains sufficient cash balances to support
its ongoing requirements and remains alert to any
anticipated adverse movement in future borrowing
rates. 
Common Good Funds and Coats
Observatory Trust 
The Council administers the Common Good Funds
for the areas of Paisley, Renfrew and Johnstone, as
well as the Coats Observatory Charitable Trust. In
order to comply with the Code, Audit Scotland and
the Office of the Scottish Charity Regulator (OSCR)
requirements, the Council separately prepares the
financial statements of the Coats Observatory
Trust, with the financial performance of the
Common Good Funds disclosed in the Council’s
Annual Accounts. Balances are also included in the
Group Accounts. Azets is the appointed auditor for
the Coats Observatory Charitable Trust. 
Overall, the Common Good Funds incurred a
combined in-year surplus of £3.832m which is
added to the previous surplus brought forward. The
Page 143 of 392

Page 144

15 
Annual Accounts 2025/26 PUBLIC
total net asset value improved by £3.832m, driven
largely by an increase in investments of £3.007m.
Both the market values of investments and income
generated from dividends are likely to be subject to
ongoing volatility as the economy responds to
global political and economic changes, and subject
to increased inflationary risk. 
The total net asset value of the Observatory Trust
increased by £0.523m owing to investment in the
Observatory as part of the Paisley Museum
Reimagined project. 
Other Key Risks
Renfrewshire Council has a robust risk
management approach and strategic, corporate
and service risks are monitored through our Audit,
Risk and Scrutiny Board.  The risks identified as
Very High for the year ahead are detailed below.
Risk Mitigating Actions
Tackling health,
wellbeing, and low-
income inequalities 
In Renfrewshire, we seek to address persistent inequality driven by poverty, the
disproportionate impact of the cost-of-living crisis on low-income households,
and ongoing changes to welfare reforms through strong partnership working;
through our Fairer Renfrewshire programme; through specific programmes to
tackle local priorities; through national programmes such as the Scottish
Attainment Challenge; and through building community capacity. A number of
workstreams under the Connected Communities initiative will seek to address
such unequal outcomes over the short to medium term.
Partnership Financial
Sustainability
In common with other Scottish partnerships, the Renfrewshire Health and
Social Care Partnership (HSCP) is facing significant financial pressures. Its
Integration Joint Board (IJB) is currently forecasting a budget gap in 2026/27 of
£7.2m. IJB reserve balances are expected to bridge this gap, but in doing so will
close the 2026/27 year with reserve balances of c£6m, which will not be
sufficient to cover anticipated 2027/28 budget pressures, and leaves no
reserves available for future years. The Integration Scheme that governs the IJB
states that should it be unable to achieve a balanced budget for future years, it
would be required to seek additional funding from its partner bodies, including
the Council.
Successful Cyber Attack The likelihood of this risk has escalated, despite sophisticated technical
security protocols and cyber architecture being in place. For those
organisations who have been impacted by successful attacks, the effects are
devastating. For security reasons, we do not publish details of the mitigating
actions in place. 
The requirement to publish trade union facility‑time information arose under the Trade Union (Facility Time
Publication Requirements) Regulations 2017. Following repeal of the relevant provisions of the Trade Union Act
2016 under the Employment Rights Act 2025, this statutory duty ended in February 2026. The organisation
therefore no longer publishes facility‑time data for periods ending after that date. 
Page 144 of 392

Page 145

16 
Annual Accounts 2025/26 PUBLIC
Conclusion and Acknowledgements 
We would like to acknowledge efforts by the whole Finance team in producing the annual accounts, as well as
colleagues in other services for their continued hard work and support. 
Further information on the annual accounts or on the Council’s general finances can be obtained on the Council
website (www.renfrewshire.gov.uk), or by telephoning 0300 300 0285. 
Cllr Iain Nicolson Alan Russell Alastair MacArthur
Leader of the Council Chief Executive Director of Finance and
Resources
Page 145 of 392

Page 146

17 
Annual Accounts 2025/26 PUBLIC
Statement of Responsibilities 
The Authority's Responsibilities 
The Authority is required to:  
• make arrangements for the proper administration
of its financial affairs and to secure that one of its
officers has responsibility for the administration
of those affairs (section 95 of the Local
Government (Scotland) Act 1973). In Renfrewshire
Council, that officer is the Director of Finance and
Resources;
• manage its affairs to secure economic, efficient
and effective use of resources and safeguard its
assets;
• ensure that the Annual Accounts are prepared in
accordance with legislation (The Local Authority
Accounts (Scotland) Regulations 2014), and so far
as is compatible with that legislation, in
accordance with proper accounting practices
(section 12 of the Local Government in Scotland
Act 2003), and;
• approve the Annual Accounts for signature. 
I can confirm that these annual accounts were
approved for signature by the Council at its meeting
on 24 September 2026. 
Signed on behalf of Renfrewshire Council. 
Cllr Iain Nicolson
Leader of the Council 
The Director of Finance and Resources’
Responsibilities 
The Director of Finance and Resources is responsible
for the preparation of the Authority's Annual
Accounts in accordance with proper practices as
required by legislation and as set out in the
CIPFA/LASAAC Code of Practice on Local Authority
Accounting in the United Kingdom (the Accounting
Code). 
In preparing the Annual Accounts, the Director of
Finance and Resources has: 
• selected suitable accounting policies and then
applied them consistently; 
• made judgements and estimates which were
reasonable and prudent;
• complied with legislation; and
• complied with the local authority Accounting
Code (in so far as it is compatible with
legislation). 
The Director of Finance and Resources has also:
• kept adequate accounting records that were up to
date; and
• taken reasonable steps for the prevention and
detection of fraud and other irregularities. 
I certify that the financial statements give a true and
fair view of the financial position of the Council and
its group at the reporting date and the transactions of
the Council and its group for the year ended 31 March
2026. 
Alastair MacArthur
Director of Finance and Resources 
Page 146 of 392

Page 147

18 
Annual Accounts 2025/26 PUBLIC
Annual Governance Statement 
Scope of responsibility
Renfrewshire Council is responsible for ensuring that
its business is conducted in accordance with the law
and proper standards, and that public money is
safeguarded, properly accounted for, and used
economically, efficiently and effectively. The Council
also has a statutory duty to make arrangements to
secure best value under the Local Government in
Scotland Act 2003. In discharging this overall
responsibility, the Council’s members and the
corporate management team are responsible for
putting in place proper arrangements for its affairs
and facilitating the effective exercise of its functions,
which includes arrangements for the management of
risk. 
The Council has approved and adopted a Local Code
of Corporate Governance, which is consistent with
the principles of the Chartered Institute of Public
Finance and Accountancy (CIPFA) and the Society of
Local Authority Chief Executives (SOLACE)
framework; Delivering Good Governance in Local
Government. A copy of the Local Code is available on
our website at: www.renfrewshire.gov.uk > Your
Council > Information, performance and statistics >
Information Governance 
This statement explains how Renfrewshire Council
has complied with the Local Code and also meets the
Code of Practice on Local Authority Accounting in the
UK, which details the requirements for an Annual
Governance Statement. 
The purpose of the governance
framework
The governance framework comprises the systems
and processes, and culture and values, by which the
Council is directed and controlled and through which
it accounts to, engages with and leads the
community. It enables the Council to monitor the
achievement of its strategic objectives set out in the
Council Plan. 
The system of internal control is a significant part of
that framework and is designed to manage risk to a
reasonable level. Internal control cannot eliminate all
risk of failure to achieve policies, aims and objectives
and can therefore only provide reasonable and not
absolute assurance of effectiveness. The system of
internal control is based on an ongoing process
designed to identify and prioritise the risks to the
achievement of the Council’s policies aims and
objectives, to evaluate the likelihood of those risks
being realised and the impact should they be
realised, and to manage them efficiently, effectively
and economically. 
The governance framework
The main features of our governance arrangements
are described in the Local Code but are summarised
below: 
Corporate Governance
• The Council operates within an established
governance framework which incorporates a
scheme of delegated functions, financial
regulations, standing orders relating to contracts
and procedural standing orders. These elements
of the framework are kept under regular review by
the Council.
• The Council facilitates policy and decision making
through a policy board structure.
• Clear and independent governance arrangements
are in place with One Ren and the Renfrewshire
Health and Social Care Partnership with oversight
from the Head of Policy and Partnerships and the
Head of Corporate Governance respectively and
the Council’s Leadership Board.  In terms of One
Ren specifically, the Head of Policy and
Partnerships and Head of Finance and
Procurement also sit on the One Ren board as
Council appointed observers.  A review of services
commissioned by the Council from One Ren is
ongoing, and as part of this process all related
service and operational agreements are subject to
review.
• Seven Local Partnerships are in operation and
have identified local priorities. Decision making
Page 147 of 392

Page 148

19 
Annual Accounts 2025/26 PUBLIC
including that relating to relevant grants is
delegated to each Local Partnership through a
Lead Officer appointed by the Council, through the
Chief Executive. 
Strategic Policy and Planning
• The overarching strategic priorities and vision of
the Council are set out in the Council Plan 2022-
2027, which was refreshed in 2024 to make sure
our priorities were clear and focused and to reflect
how quickly the context was changing. The
Council Plan is aligned to the Renfrewshire
Community Plan 2017-2027 and sets out 5
strategic outcomes that the organisation will work
to achieve over a 5-year period with specific
priorities relating to tackling inequality, promoting
economic and cultural regeneration, attainment
and sustainability. These strategic outcomes are
underpinned by a cross-cutting theme of
Improving outcomes for children and families.
• Renfrewshire’s Community Plan (which also acts
as Renfrewshire’s Local Outcome Improvement
Plan as required by the Community Empowerment
(Scotland) Act 2015) details how the Council and
its community planning partners will work together
to achieve the key priorities identified for
Renfrewshire. A mid- term review of the
Community Plan was also undertaken in 2022 in
tandem with the development of the new Council
Plan, which identified three key areas of focus
which would be progressed by partners.
• Work has recently commenced on the refresh of
both plans, with a view to these being finalised by
September 2027.
Service Delivery and Performance
Management
• Services can demonstrate how their own activities
link to the Council’s vision and priorities through
their service improvement plans. Performance
management and monitoring of service delivery is
reported through policy boards regularly including
six monthly updates to the Leadership Board on
progress against the implementation of the
Council Plan alongside six-monthly updates to
policy boards on the service improvement plans.
Operational reports are also provided to relevant
policy boards by different services.
• The Council has developed a performance
management framework and uses the Pentana
Portal to co-ordinate and host all performance
information.
• A Performance Board was established in 2025 and
chaired by the Director of Environment, Housing
and Infrastructure. This is an officer group with all
services represented and its focus is to drive
improvements in performance corporately and
across Council services. Service areas can be
referred for a ‘deep dive’ exercise providing access
to peer support and other resources to improve
performance; referrals may be from the teams
themselves or from senior leadership.
• Regarding Performance Monitoring, the Council
Plan scorecard is considered alongside other
performance information each quarter by the
Performance Board (established in 2025) and
areas requiring additional scrutiny can be referred
up to the Corporate Management Team (CMT). The
CMT has access to the Pentana portal which is
updated quarterly and shows performance against
all Council Plan indicators and followed up with an
in-depth look at performance in one service
particular area of interest at regular intervals.
Performance scrutiny sessions between the Chief
Executive and Directorate teams are undertaken,
typically twice a year.
• An annual report on the Local Government
Benchmarking Framework, which includes data
for over 100 indicators for all 32 local authorities,
is provided to the Audit, Risk and Scrutiny Board
each year. This will increase to 6 monthly in
accordance with the 2025/26 Statutory
Performance Direction.
• The Council makes a range of performance
information available on its website, including the
publication of its public performance report " How
are we doing?", in line with statutory requirement.
• A revised Business Continuity Policy is in
operation and services have business continuity
plans in place.
Page 148 of 392

Page 149

20 
Annual Accounts 2025/26 PUBLIC
Elected Members and Employees
• The Council has adopted a code of conduct for its
employees which is currently under review as part
of the Council’s People Strategy implementation. 
A revised code is expected to be presented to
Members for approval in the autumn 2026. Elected
members adhere to the nationally prescribed
Code of Conduct for Members. In addition, the
Council has in place a protocol for Relationships
between Political Groups, Elected Members and
Officers.
• Comprehensive arrangements are in place to
ensure members and officers are supported by
appropriate training and development, including a
range of mandatory training which all staff
undertake.
• Registers of interests for elected members and
senior officers are maintained and published on
the Council’s website.
Risk Management
• Renfrewshire Council has a well-established
approach to risk management with many positive
features. During 2025/2026 the council has been
progressing the recommendations from an
external review undertaken the previous year.  Of
note, an updated Risk Matters (combined risk
policy and strategy), has been prepared and
approved by the Audit, Risk and Scrutiny Board in
May 2026.   Additionally, during 2025/2026, the
risk and insurance function moved out of Internal
Audit Services and is now under the leadership of
the Head of Business Services, Risk and Safety.
• Risks continue to be reported 6 monthly to the
Audit, Risk and Scrutiny Board and a Risk
Management Annual Report is also provided to
Board in respect of corporate risk management
arrangements. Online and in-person risk
management courses continue to be available to
all staff. Our innovative approach for business-as-
usual risks (BaURAM © Renfrewshire Council) has
now completed 3 years of operation and continues
to provide valuable insight to how specific risks
are being managed in practice across all areas of
the council.
Information Governance
• The Director of Finance and Resources is the
Council’s Senior Information Risk Owner and
information risk is monitored through the
Information Management and Governance Group
and its sub-groups, including the Information
Security Group. The Managing Solicitor (DPO) is
the statutory Data Protection Officer.
Cyber Security and Counter Fraud
• Cyber-attacks are growing in both frequency and
sophistication; with the evolving threat landscape
being further influenced by geopolitical factors,
which have increased the risk of cyber-attacks
against UK public sector organisations. While no
system or internal control can offer absolute
protection, the Council has implemented a
comprehensive, multi-layered set of cyber security
controls. These controls are subject to annual
testing to ensure alignment with current
government standards and best practices.  The
Council adheres to recognised industry and public
sector cyber security standards, including those
set by the Public Sector Network (PSN), the
National Cyber Security Centre (NCSC), the
Scottish Government Public Sector Cyber
Resilience Framework, and the Payment Card
Industry Data Security Standards (PCI DSS). The
O365 security and compliance toolset provides a
wide range of protection against cyber-attacks
including identity theft and phishing. 
• The Council holds a current Certificate of
Compliance for PSN standards. ICT network and
digital services are continuously monitored for
threats, with ongoing vulnerability assessments
conducted in partnership with our external cyber
security provider. All activity is overseen by the
Security & Compliance Team, led by a Security &
Compliance Manager (Cyber) holding both CISSP
and CISM certifications.  Security events and
alerts are monitored 24/7 by our cyber security
partner, who are authorised to take immediate
preventative action when necessary to protect
systems and data and in addition the Council has
a Cyber Incident Response Team (CIRT) contract
in place, providing access to specialist external
expertise in the event of a cyber incident. This
Page 149 of 392

Page 150

21 
Annual Accounts 2025/26 PUBLIC
includes support for incident triage, containment
and eradication, digital forensics, threat
intelligence, and recovery ensuring that, alongside
internal capabilities, the Council can respond
effectively to incidents, minimise disruption to
services, and meet regulatory and reporting
obligation. 
• The Council complies with the CIPFA Code of
Practice on Managing the Risk of Fraud and
Corruption and the Council’s arrangements for
fraud prevention, detection and investigation are
managed through the corporate counter fraud
service.  The Council’s Counter Fraud Policy was
updated in November 2024.
• The Council’s approach to ‘whistleblowing’ is
outlined in the whistleblowing policy which was
revised in April 2026 and approved by the Finance,
Resources and Customer Services Policy Board to
reflect the disclosure protections being brought in
as part of the Employment Rights Act 2025
reforms.  A session on the policy was delivered to
the Council’s senior manager forum in early 2026
to promote awareness and understanding.
This governance framework has been in place at
Renfrewshire Council for the year ended 31 March
2026. 
The system of internal financial control
The system of internal financial control is based on a
framework of regular management information,
financial regulations, administrative procedures
(including segregation of duties), management and
supervision, and a system of delegation and
accountability. Development and maintenance of the
system is undertaken by managers within the
Council. The system includes:
• Guidance on financial management supported by
comprehensive financial regulations and codes;
• Comprehensive budgeting systems, and detailed
guidance for budget holders;
• Regular reviews of periodic and annual financial
reports which indicate financial performance
against the forecasts;
• Setting targets to measure financial and other
performance;
• Clearly defined capital expenditure guidelines;
• As appropriate, formal project management
principles;
• The Chief Finance Officer is the Director of
Finance and Resources who complies with the
CIPFA Statement on the Role of The CFO in Public
Services. 
The role and responsibilities of the Audit
Committee and the Chief Auditor
The role of the audit committee is under the remit of
the Audit, Risk and Scrutiny Board, which is chaired
by an independent elected member, its role includes:
• to approve the internal audit charter and annual
internal audit plans;
• to review internal and external audit reports and
the main issues arising, including those relating to
the annual accounts and seek assurance that
action has been taken and make
recommendations to the Council where
appropriate;
• to receive and consider the Chief Auditor’s annual
report, summarising internal audit activity and the
level of assurance this provides over the
arrangements for internal control, risk
management and governance within the Council;
• to monitor the performance of Internal Audit;
• to consider the annual review of the Local Code of
Corporate Governance.
The internal audit service operated in accordance
with Public Sector Internal Audit Standards during
2025/26 and reports to the Audit, Risk and Scrutiny
Board. Internal audit undertakes an annual
programme of work, approved by the Board, based on
a strategic risk assessment. The Council’s Chief
Auditor provides an independent opinion on the
adequacy and effectiveness of the governance
framework, risk management and internal control.
The Council conforms to the requirements of the
CIPFA Statement on the Role of the Head of Internal
Audit (2019).
Page 150 of 392

Page 151

22 
Annual Accounts 2025/26 PUBLIC
Members and officers of the Council are committed
to the concept of sound governance and the effective
delivery of Council services. The Audit, Risk and
Scrutiny Board complies with the CIPFA guidance
Audit Committees: Practical Guidance for Local
Authorities and Police. The Council’s Chief Auditor
has responsibility to review independently and report
to the Audit, Risk and Scrutiny Board annually, to
provide assurance on the adequacy and
effectiveness of the Local Code and the extent of
compliance with it. The Audit, Risk and Scrutiny
Board performs a scrutiny role in relation to the
application of the Local Code of Corporate
Governance and regularly monitors the performance
of the Council’s Internal Audit service. 
Internal Audit reporting arrangements include
communication of finalised audit engagements,
monitoring the progress of agreed management
actions and communication of any unacceptable risk
identified to the Board. 
Review of effectiveness and continuous
improvement
Renfrewshire Council has responsibility for
conducting, at least annually, a review of the
effectiveness of its governance framework including
the system of internal control. The review of
effectiveness of the framework is informed by the
work of the Corporate Management Team who have
responsibility for the development and maintenance
of the governance environment, the Chief Auditor’s
annual report, and reports from the external auditors
and other review agencies and inspectorates. 
The effectiveness of the governance framework and
how the organisation manages its risks is reviewed
annually by the Corporate Management Team,
including the use of an annually updated self-
assessment tool covering twelve key areas of
governance, internal control and risk as follows:
• Asset Management
• Complaints, Comments and Claims
• Financial Control and Governance
• Health and Safety, and managing adverse events
• Information Handling
• Organisational Resilience
• Partnership Management
• People, Wellbeing and Development
• Programme Management
• Service Performance
• Community and Public Safety
This self-assessment indicated the governance
framework is being complied with in all material
respects. The 2025/26 outturn compares favourably
with 2024/25, with only one limited assurance score
in the Information Handling module compared to six
limited assurances over six modules.  In addition, the
review of the effectiveness of the governance
arrangements and the systems of internal control
within the group entities 
places reliance upon the individual bodies’
management assurances in relation to the
soundness of their systems of internal control. 
The Council’s approach to continuous improvement
has several strands and is closely aligned to our
Council value of “we value learning”. Our Council
Plan and Service Improvement Planning processes
drive much of this and allow for elected member
scrutiny of improvement activity. Services also
undertake improvement work linked to their core
duties and to statutory requirements. Registered
services in education, housing, social work and social
care regularly undertake self-assessment activity as
part of their regulatory framework and inspection
process. Services within Environment, Housing and
Infrastructure maintain their ISO 9001 accreditation
as one means of demonstrating quality. 
A Transformation Board (officer group) has been
established to provide strategic oversight of the
Reshaping Renfrewshire programme. Chaired by the
Director of Finance and Resources, this group has a
membership of senior officers across the Council and
reviews the progress of all major projects and
programmes across the organisation, explores and
manage interdependencies, shares learning and
Page 151 of 392

Page 152

23 
Annual Accounts 2025/26 PUBLIC
supports the management and prioritisation of
resources across the programme. 
The Council continues to recognise the need to
exercise strong financial management arrangements
to manage the financial pressures common to all
local authorities and it has robust financial control
and financial planning processes in place. The CIPFA
Financial Management (FM) Code was first adopted
by the Council in June 2021, and the resulting action
plan contained 59 improvement actions. There are
currently 8 outstanding actions still in progress, most
of a longer-term nature, with target dates up to
December 2026. Work to refresh the initial
engagement will be undertaken by the end of 2026/27
to ensure that improvement work continues to be
focused, relevant and effective. 
The Council continues to manage a number of very
significant issues and is operating within a context of
new and emerging challenges which require the
Council to respond very flexibly to the changing
needs of local businesses, communities and citizens.  
These factors include: 
• Ongoing economic and geopolitical uncertainty
and volatility, which has significantly increased
costs and impacted supply chains utilised by the
Council and its partners. The linked cost of living
crisis has also required the Council to respond in
new ways with partners to meet the needs of those
most vulnerable across Renfrewshire through our
Fairer Renfrewshire Programme and Action Plan. 
This remains under regular review, most recently
to consider the impacts of the conflict in the
middle east in terms of local household income as
well as in relation to the Council and its
expenditure.
• Inflationary cost pressures, including those linked
to pay, continue to significantly impact the
Council’s financial position.  The Council
continues to progress its long-term change and
transformation programme which will drive a
range of service improvements and financial
savings across the organisation over both the
short and medium term.
• Demand pressures on Council services continue
to be experienced particularly in relation to areas
such as housing and homeless services and the
provision of support through, for example, the
Scottish Welfare Fund.
• New and emerging policy developments at a
Scottish and UK government level, including in
relation to employment legislation, immigration,
education provision including reduced class
contact time and the public service reform agenda
in Scotland, particularly in relation to health and
social care and education.
• Responding to the changing needs of our local
population, particularly in relation to migration
and asylum, support for refugee resettlement and
overall population growth which is projected to
continue into the longer term.
• Continuing to embed new ways of working across
all aspects of our service delivery. This includes
building on new working practices following the
pandemic through hybrid and flexible working
opportunities, as well as embracing the
opportunities that can be realised through new
advances such as AI.
• Progressing the next phase of the Council’s
transformation journey – Reshaping Renfrewshire
which will focus on improving outcomes for local
communities and residents, whilst addressing the
ongoing financial challenges facing the Council
over the medium term.  The programme also has a
strong focus on delivering against key corporate
priorities such as place shaping – focusing on
investment in infrastructure such as housing and
our learning estate.
• Building trust and engagement mechanisms with
local stakeholders is a particular priority for the
Council strategically and at a service level. 
Building on our consultation and engagement
strategy and the results from our resident
research, a strong commitment has been made to
strengthening the Council’s approach to listening
and engaging authentically with citizens and
communities.  It is recognised that trust in public
sector authorities is reducing, and the Council will
Page 152 of 392

Page 153

24 
Annual Accounts 2025/26 PUBLIC
need to respond positively to address this,
including by tackling issues such as mis/dis/mal
information.
• Regardless of the Council’s technical
preparedness for a cyber-attack, the threat
remains acute and present, as evidenced by
successful attacks on other public sector
organisations, with the risk of significant impact
on council operations.
Audit Scotland introduced a new approach to
auditing Best Value in local government which
commenced in 2023 as part of the next 5-year Best
Value Audit programme. This approach involves
thematic areas of focus each year which will be
considered for all local authorities within the same
snapshot in time rather than the previous rolling
programme of deep dive audits which inspect each
local authority across a five-year programme. These
reviews have included leadership and governance,
workforce innovation and transformation. The
thematic review in 2026 will consider asset
management. 
The Council has received positive reports in relation
to each of the thematic reviews which have each
been presented to the Audit Risk and Scrutiny Board
by the Council’s external auditors, Azets. 
Following a report to the Accounts Commission in
2024 in relation to Dargavel Primary School and the
related s102 process, the Council was notified that
further updates in relation to the s102 report would
be incorporated within wider best value audit activity
planned for Renfrewshire Council, which would be
accelerated to early 2025. The Best Value Audit
process was undertaken during 2025, with findings
being reported in May 2025 by the Accounts
Commission. Overall the report was very positive with
it being noted that: ‘Renfrewshire Council has a
strong commitment to improving, including creating a
positive culture, supporting its staff to develop as
leaders, and focusing on engaging with residents. It
must now talk to them about tough spending
decisions that lie ahead.’ 
The 2024/25 Action Plan from the separate self-
assessment against the CIPFA guidance for effective
Audit Committees which was undertaken with the
members of the Audit, Risk and Scrutiny Board has
now been implemented and the agreed actions are
currently being progressed. 
The external auditors, Azets, provided an unqualified
audit opinion on the 2024/25 annual accounts and
concluded in their annual audit report that the vision,
leadership and governance arrangements were
effective and appropriate. 
Regular reviews of the Council’s governance
arrangements are undertaken by internal audit. The
programme of work undertaken by internal audit
during 2025/26 identified three occasions where a
limited assurance level was given in relation to the
internal control, risk management and governance
objectives for the specific areas of each audit review.
All were specific to individual service areas and
although these areas require to be addressed there is
no significant impact on the Council’s overall system
of internal control and action plans are in place to
address the risk identified. 
In addition, internal audit conducted two investigative
reviews of grant funding given to community
organisations and these identified that the Council
governance arrangements for grants were
unsatisfactory and the Council’s grant conditions
required to be reviewed. This is being progressed by
Senior Management. 
Internal audit undertakes an annual exercise to
ensure that recommendations arising from internal
audit engagements have been implemented by
service management and the results are reported to
the Audit, Risk and Scrutiny Board. This work
highlighted that 85% of recommendations were
implemented by the due date, 14% had passed their
original due date and revised implementation dates
have now been set and 1% were superseded. Of the
33 recommendations followed up that were deemed
to be critical, 27 have been fully implemented and 6
has been partially implemented. Revised
Page 153 of 392

Page 154

25 
Annual Accounts 2025/26 PUBLIC
implementation dates have been agreed for each of
the partially implemented recommendations. 
It is our view that the Council has in place a sound
framework for governance, risk management and
internal control and that appropriate mechanisms are
in place to identify any areas of weakness. This is
corroborated by an Annual Report incorporating the
Annual Assurance Statement prepared by the
Council’s Chief Auditor stating that subject to
management addressing the critical and important
recommendations made and the limited assurance
report findings, it is considered that reasonable
assurance can be placed upon the adequacy and
effectiveness of the Council’s internal control, risk
management and governance arrangements. 
Forward look on governance
Three main developments have been identified which
are likely to further strengthen governance
arrangements in the forthcoming year: 
At the Leadership Board on 29 April 2026, it was
agreed that the Council will progress the AI
Transformation Programme 2026 -2030 Business
Case. 
As part of that process various elements of
governance and Elected Member oversight were
agreed. This included the creation of three specific
officer groups each dealing with specific matters
arising from the project. The AI Strategic Programme
Officer Board (chaired by the Chief Executive) will
provide the overall strategic direction and oversight of
the project, with key responsibilities including,
approving programme priorities, ensuring alignment
with corporate and service strategies, monitoring
delivery progress, managing financial oversight and
accountability, and reviewing risks and mitigation
plans. 
The AI Programme Delivery Team (chaired by the
Programme Lead) will coordinate day-to-day activity,
working closely with services to plan, test, deploy and
optimise AI solutions, with key responsibilities
including coordinating technical delivery, managing
sprint cycles and deployment plans, ensuring
compliance with governance decisions, supporting
services with implementation activities, and
monitoring early impact and usage data. 
The Ethics and Assurance Board (chaired by the Head
of Corporate Governance) will ensure responsible AI
deployment with key responsibilities including
reviewing Data Protection Impact Assessments,
ensuring GDPR compliance, upholding ethical AI
principles, monitoring fairness, transparency and
accountability, and ensuring human oversight in all
critical decision-making processes. 
To ensure Elected Member oversight of the project it
was agreed that regular updates on the AI
Transformation Programme 2026 – 2030 will be
brought to the Leadership Board at appropriate key
junctures as the overall programme is progressed
over the next 3+ years, and that a 6-monthly ‘AI
Transparency Report’ will also be brought to the
Leadership Board outlining AI tools used by the
Council, the purpose and function of each system,
any data-protection or equality assessments
undertaken, changes since the previous report, and
any identified risks, mitigations or recommendations
for future deployment.” 
Following on from the Internal Audit investigative
reviews of grants, management acknowledged that
the processes for awarding of grants throughout the
Council to third party organisations were inconsistent
and that the Council’s Conditions of Grant required
updating. A governance review of grant processes is
therefore planned to commence in 2026/27. 
Reflecting the approach set out and reported through
the Reshaping Renfrewshire Transformation and
Change Programme to the Council’s Leadership
Board in February 2026, evaluation findings from the
leadership programme, alongside insights from the
Cultural Assurance Model (CAM), are being used to
inform a more targeted and risk-based approach to
leadership development for line managers and senior
officers across the Council. This represents a move
away from time-limited development programmes
towards a more sustained focus on leadership
capability as an enabler of effective governance and
Page 154 of 392

Page 155

26 
Annual Accounts 2025/26 PUBLIC
assurance. Leadership development activity will
prioritise the behaviours and capabilities that
evidence shows have the greatest impact on
performance, assurance, and team climate. 
As part of this next phase, a new managers’ induction
module will be introduced to provide a consistent
foundation for colleagues taking on management
responsibilities within the Council. The module will
support new starters to understand their role in
managing performance, risk, governance and
assurance from the outset, while existing managers
will also be encouraged to complete it to reinforce
core expectations. This approach recognises
transition into management as a point of heightened
organisational risk and supports more consistent
managerial accountability and assurance across
services. 
In parallel, work is underway to design a dedicated
development offer for newly appointed Chief Officers,
whether recruited internally or externally. This
programme will provide structured, assessment-
informed development alongside coaching and
mentoring, supporting effective transition into role,
early establishment of leadership authority, and
understanding of the Council’s organisational,
governance and cultural context. The intention is to
launch the programme in autumn 2026 as part of a
more coherent, end-to-end leadership development
pathway that supports succession planning, long-
term organisational resilience, and strengthened
corporate governance. 
Work, planning for the next local government
elections and the new council in 2027, has
commenced throughout the Council and a highly
experienced group of staff will lead and deliver
workstreams that support electoral event with
integrity. 
In addition, our external auditors Azets will undertake
planned annual best value audit activity in Summer
2026, with a key focus on the Council’s activities in
relation to Fairness and Inequality. Any related
findings will be reported as per the standard process
through the Annual Audit report in September 2026. 
Action Plan
Following consideration of the review of adequacy and effectiveness the following action plan has been agreed to
ensure continual improvement of the Council’s governance. 
Agreed action Responsible person Date
Undertake review of Council’s conditions of grant
and produce updated internal guidance on grants
management processes.
Head of Policy and
Partnerships
December 2027
Implement actions arising from the Audit, Risk
and Scrutiny Board Member’s self-assessment
which are detailed in the ARSB Annual Report,
reported to Council in May 2026.
Head of Corporate
Governance/Chief
Auditor
March 2027 
Update on Previous Action Plans
The agreed actions will be subject to review to identify the progress being made in implementing these actions. 
Page 155 of 392

Page 156

27 
Annual Accounts 2025/26 PUBLIC
2024/25 Action Plan 
Agreed action Progress Update Responsible
person
Date
Implement recommendations
from Best Value Reports,
including the follow up report
on the council’s approach to
community engagement and
culture change
All recommendations are
incorporated as actions within the
Council’s agreed Corporate
Improvement Plan. Updates on
progress are reported on a 6
monthly basis to Leadership Board. 
The last update was provided in
February 2026 and noted the
majority of actions were now
complete with a small number of
longer term actions being
implemented on an ongoing basis,
but within agreed deadlines.
Chief Executive
& Director of
Finance and
Resources
Complete
Implement the new Statutory
Performance Information
Direction in line with statutory
timescales
All requirements relating to the
new SPI Direction have been fully
implemented – this includes
amendments to our public
performance report and increased
frequency of reporting of Local
Government Benchmarking data to
Audit Risk and Scrutiny Board.
Head of Policy
and
Partnerships
Complete
Address the improvement
action arising from the
independent review of the
Council’s Risk Management
Arrangements
All agreed recommendations are
being taken forward and are
incorporated into the Strategic Risk
Management Development Plan.
The progress of this plan is
monitored over the life cycle of the
Risk Management Policy and
progress is reported as part of the
Annual Report.
Director of
Finance and
Resources
Complete 
2023/24 Action Plan 
Agreed action Progress Update Responsible
person
Date
Implement improvement plan
arising from the Corporate
Self-Assessment Exercise.
With one exception , all of these
actions have been completed. The
development of a webpage on
transformation is currently being
progressed.
Head of Policy
and
Partnerships
September
2026
Page 156 of 392

Page 157

28 
Annual Accounts 2025/26 PUBLIC
Agreed action Progress Update Responsible
person
Date
The recommendations arising
from the review of the
corporate health and safety
internal audit report, will be
considered and an action plan
developed for implementation.
Recommendations have been
actioned, with one ongoing (the
procurement and implementation
of a H&S management system)
which is progressing.
Director of
Finance and
Resources
Complete 
2022/23 Action Plan 
All the agreed improvement actions are now complete. 
Assurance 
Subject to the above, and on the basis of the assurances provided, we consider the governance and internal
control environment operating during 2025/26 provides reasonable and objective assurance that any significant
risks impacting on the achievement of our principal objectives will be identified and actions taken to avoid or
mitigate their impact. Systems are in place to continually review and improve the governance and internal control
environment and action plans are in place to address identified areas for improvement. 
Cllr Iain Nicolson Alan Russell
Leader of the Council Chief Executive  
Page 157 of 392

Page 158

29 
Annual Accounts 2025/26 PUBLIC
Remuneration Report 
The Local Authority Accounts (Scotland) Amendment
Regulations 2014 (SSI No. 2014/200) amend the Local
Authority Accounts (Scotland) Regulations 2011 (SI
No 2011/64) and requires local authorities in
Scotland to prepare a Remuneration Report as part of
the annual statutory accounts. All information
disclosed in sections 3 to 8 in this Remuneration
Report will be audited by the Council’s appointed
auditor, Azets. The other sections of the
Remuneration Report will be reviewed by Azets to
ensure that they are consistent with the financial
statements. 
It should be noted that due to the commencement of
Section 66 of the Employment Rights Act 2025, public
bodies in Scotland are no longer required to include 
disclosures in their annual report or accounts relating
to Trade Union Facility Time. As a result, this section
(formerly section 9) is now removed from the
Remuneration Report. 
1. Remuneration Policy for Senior
Employees 
The salary of senior employees is set by reference to
national arrangements. The Scottish Joint Negotiating
Committee (SJNC) for Local Authority Services sets
the salaries for the Chief Executives of Scottish local
authorities. The salaries of the Corporate Directors
and Heads of Service are based on a spinal column
point model as agreed by the Finance and Resources
Policy Board on 14 May 2014. Senior employees
received a 4.0% pay award in 2025/26. 
In December 2025, Council Leaders (through COSLA)
implemented a new pay framework for Scottish local
authority Chief Executives. In line with the Council’s
established pay relationships, this had a
consequential impact on the salary levels of Chief
Officers whose pay is linked to the Chief Executive. 
2. Remuneration policy for the Leader of
the Council, the Provost and Senior
Councillors 
The annual salary of the Leader of the Council and
the upper limit for the annual salary of the Provost (or
civic head) are set by the Scottish Government in
terms of the Local Governance (Scotland) Act 2004
(Remuneration) Regulations 2007, as amended by the
Local Governance (Scotland) Act 2004
(Remuneration) Amendment Regulations 2025. The
salary for the Leader of the Council in 2025/26 was
£50,063 per annum (£42,698 in 2024/25) and the
salary for the Provost was £37,548 per annum
(£32,024 in 2024/25). 
In terms of the same Regulations, the Scottish
Government permits Renfrewshire Council to
nominate up to 14 senior councillors (in addition to
the Leader of the Council and the Provost), whose
salaries in aggregate must not exceed a specified
amount, in 2025/26 being £444,705 per annum; and
whose salaries individually must be on a specified
scale, in 2025/26 £25,028 to £37,458. At the Council
meeting of 30 June 2022, it was agreed that
Renfrewshire Council would have 13 senior
councillors: six Policy Board Conveners (salary of
£36,885 per annum in 2025/26); four Regulatory
Board Conveners (salary of £29,924 in 2025/26);
Chair of OneRen Board and Chair of Integration Joint
Board (salary of £36,885  in 2025-26); Chair of
Valuation Joint Board (salary of £28,207 in 2025/26),
and one Leader of the Opposition (salary of £29,924
in 2025/26). 
3. Remuneration of Senior Employees 
The regulations define a senior employee as any
employee who meets one or more of the following
criteria: 
• has responsibility for the management of the local
authority to the extent that the person has power
to direct or control the major activities of the
authority whether solely or collectively with other
persons. 
Page 158 of 392

Page 159

30 
Annual Accounts 2025/26 PUBLIC
• holds a post that is politically restricted by reason
of section 2(1)(a), (b) or (c) of the Local
Government and Housing Act 1989. 
• whose annual remuneration, including any annual
remuneration from a local authority subsidiary
body is £150,000 or more. 
The Council has interpreted the above criteria as
including the Chief Executive, Directors and the Chief
Executive of OneRen.
The term ‘remuneration’ means gross salary, fees
and bonuses, allowances and expenses and
compensation for loss of office. The table below
outlines the remuneration details for senior
employees, including prior year figures. The table
shows the relevant amounts, before tax and other
deductions, due to, or receivable by, each of the
persons named for the year to 31 March 2026,
whether or not those amounts were actually paid to,
or received by, those persons within that period.
There were no non-consolidated bonuses or
performance-related payments made to any senior
officer in 2025/26. 
2024/25
Total
Remuneration
Total
Remuneration
£ £
181,134 Alan Russell Chief Executive 184,806
144,953 Alastair MacArthur Director of Finance and Resources 149,498
143,953 Gordon McNeil Director of Environment, Housing & Infrastructure 149,498
138,112 Janie O'Neil Director of Children's Services 149,498
608,152 Total 633,300
Senior employees
Name Post held
2025/26
In 2025/26, there was no renumeration received by Senior Officers in connection with election activities. In
2024/25 this was £10,996. 
2024/25 2025/26
Total
Remuneration
Total
Remuneration
£ £
120,016 Victoria Hollows 125,534
120,016 125,534
Chief Executive, OneRen
Total
Name
Senior Employees of Subsidiary Bodies
Post held
4.  Remuneration of Senior Councillors 
Under the regulations, remuneration disclosures are to be made for the Leader of the Council, the Civic Head and
any Councillor designated as a Senior Councillor by the Council. The table below shows the relevant amounts,
before tax and other deductions, due to each of the persons named for the year to 31 March 2026, whether or not
those amounts were actually paid or received within that period and relate only to the Senior Councillor posts
indicated.
Page 159 of 392

Page 160

31 
Annual Accounts 2025/26 PUBLIC
2024/25 2025/26
Total
Remuneration Name Position held
Total
Remuneration
£ £
42,698 Iain Nicolson Leader Of the Council 50,063
32,024 Lorraine Cameron Provost 37,548
30,746 Michelle Campbell Policy Board Convener 36,885
30,746 Marie McGurk Policy Board Convener 36,885
30,746 Jim Paterson Policy Board Convener 36,885
30,746 Emma Rodden Policy Board Convener 36,885
30,746 John Shaw Policy Board Convener 36,885
30,746 Andy Steel Policy Board Convener 36,885
25,522 Stephen Burns Regulatory Board Convener 29,924
25,522 Andy Doig Regulatory Board Convener 29,924
25,522 Cathy McEwan Regulatory Board Convener 29,924
25,522 John McNaughtan Regulatory Board Convener 29,924
30,746 Jennifer Adam Chair/Vice Chair IJB 36,885
30,746 Lisa-Marie Hughes Chair, OneRen 36,885
25,522 Iain McMillan Leader of largest opposition group 29,924
448,300 532,311Total
Senior Councillors
No payments were made in connection with loss
of employment or office, nor were any other
payments made which are not included in the
table. 
5. Pension Entitlement 
Pension benefits for councillors and local
government employees are provided through the
Local Government Pension Scheme (LGPS). 
Councillors’ pension benefits are based on career
average pay. The councillor’s pay for each year or part
year ending 31 March (other than the pay in the final
year commencing 1 April) is increased by the
increase in the cost of living, as measured by the
appropriate index (or indices) between the end of that
year and the last day of the month in which their
membership of the scheme ends. The total of the
revalued pay is then divided by the period of
membership to calculate the career average pay. This
is the value used to calculate the pension benefits. 
From 1 April 2015 benefits for local government
employees are based on career average pay. Pension
benefits are based on the pay received for each year
in the scheme increased by the increase in the cost of
living, as measured by the appropriate index (or
indices). The scheme’s normal retirement age is
linked to the state pension age of each member. 
From 1 April 2009 a five-tier contribution system was
introduced with contributions from scheme members
being based on how much pay falls into each tier.
This is designed to give more equality between the
cost and benefits of scheme membership. Prior to
2009 contributions rates were set at 6% for all non-
manual employees. The tiers and members
contribution rates are as follows: 
Equivalent bandings
for 2024/25
Up to £27,500 5.5% Up to £27,000
£27,501 to £33,600 7.25% £27,001 to £33,000
£33,601 to £46,100 8.5% £33,001 to £45,300
£46,101 to £61,400 9.5% £45,301 to £60,400
Over £61,401 12% Over £60,401
Tiered contribution rates on whole
time pay
2025/26
If a person works part-time their contribution rate will
be based on their part-time pay. 
There is no automatic entitlement to a lump sum.
Members may opt to give up (commute) pension for
Page 160 of 392

Page 161

32 
Annual Accounts 2025/26 PUBLIC
lump sum up to the limit set by the Finance Act 2004.
The accrual rate guarantees a pension based on
1/49th of pensionable pay for each year of
membership, adjusted in line with the cost of living
(prior to 2015 the accrual rate guaranteed a pension
based on 1/60th of final pensionable salary). 
The value of the accrued benefits has been 
calculated on the basis of the age at which the
person will first become entitled to receive a
pension on retirement without reduction on
account of its payment at that age; without
exercising any option to commute pension
entitlement into a lump sum; and without any
adjustment for the effects of future inflation. 
The pension entitlements for Senior Employees and
Senior Councillors for the year to 31 March 2026 are
shown in the table below, together with the
contribution made by the Council to each individual’s
pension during the year. 
Any senior employees or councillors omitted from the
following tables are not members of the Local
Government Pension Scheme (LGPS).
2025/26 2024/25 Pension Lump
Sum
Pension Lump Sum
£ £ £000 £000 £000 £000
Alan Russell Chief Executive 11,965 11,541 97 118 11 13
Alastair
MacArthur
Director of Finance and
Resources
9,682 9,412 75 89 8 9
Gordon McNeil Director of Environment,
Housing & Infrastructure
9,682 9,412 61 41 7 4
Janie O'Neil Director of Children's
Services
9,679 9,129 18 0 3 0
41,008 39,494 251 248 29 26Total
Senior Employees
Name Post held
In-year pension
contributions by
Renfrewshire Council
Accrued pension
benefits as at 31
March 2026
Change in accrued
pension benefits since
31 March 2025
2025/26 2024/25 Pension Lump
Sum
Pension Lump Sum
£ £ £000 £000 £000 £000
Victoria Hollows Chief Executive, OneRen 8,131 7,939 58 57 7 4
8,131 7,939 58 57 7 4
Senior Employees of Subsidiary Bodies
Name Post held
In-year pension
contributions by
Renfrewshire Leisure
Accrued pension
benefits as at 31
March 2026
Change in accrued
pension benefits since
31 March 2025
Total 
The following table reports on in-year pension contributions relating to senior councillor positions only. Pension
benefits shown relate to those that the individual has accrued as a consequence of their total local government
service and not just their current appointment. 
Page 161 of 392

Page 162

33 
Annual Accounts 2025/26 PUBLIC
6. Councillors’ remuneration 
The Council paid the following amounts to its elected members (councillors) during the year. 
2025/26 2024/25 Pension Lump
Sum
Pension Lump Sum
£ £ £000 £000 £000 £000
Iain Nicolson Leader Of the Council 3,239 2,822 13 3 1 0
Michelle
Campbell
Policy Board Convener 2,386 2,032 5 0 1 0
Marie McGurk Policy Board Convener 2,386 2,032 7 0 1 0
Jim Paterson Policy Board Convener 2,386 2,032 6 0 1 0
Emma Rodden Policy Board Convener 2,386 2,032 5 0 1 0
John Shaw Policy Board Convener 2,386 2,032 6 0 1 0
Andy Steel Policy Board Convener 2,386 2,032 6 0 1 0
John
McNaughtan
Regulatory Board Convener 1,936 1,687 5 0 1 0
Stephen Burns Regulatory Board Convener 1,936 1,687 5 0 1 0
Andy Doig Regulatory Board Convener 1,936 1,687 5 0 1 0
Jennifer Adam Chair/Vice Chair IJB 2,386 2,032 6 0 1 0
Lisa-Marie
Hughes
Chair, OneRen 2,386 2,032 6 0 1 0
Iain McMillan Leader of largest opposition
group
1,936 1,687 2 0 0 0
Total 30,071 25,826 77 3 12 0
Leader of the Council, Provost, Senior councillors
Name Post held
In-year pension
contributions by
Renfrewshire Council
Accrued pension
benefits as at 31
March 2026
Change in accrued
pension benefits since
31 March 2025
2024/25 2025/26
£ £
1,051,873 Salaries 1,262,442
917 Travel costs – reimbursed 1,609
5,456 Travel costs – paid directly by the Council 6,473
2,951 Training and Conferences 4,033
0 Telephone and information technology expenses – reimbursed 53
2,983 Telephone and information technology expenses – paid directly by the Council 2,508
1,064,180 Total 1,277,118 
The public record of members' salaries, allowances and expenses for 2025/26 is available for inspection on the
Register of Councillors’ Interests page of the Council’s website and navigating to: Your Council>Councillors>
Record of councillor salaries, allowances, expenses and training register. 
Page 162 of 392

Page 163

34 
Annual Accounts 2025/26 PUBLIC
7. Remuneration of Employees 
The following table gives a statement of the number of employees whose remuneration, excluding pension
contributions, was in excess of £50,000 during 2025/26, in bands of £5,000; and also details of the number of those
employees highlighted who left the employment of the Council during 2025/26. This information includes those
senior employees who are subject to the fuller disclosure requirements in the tables above.  Note that leavers may
be included due to retirement or redundancy costs.  Bands with nil employees for both years are not shown. 
Teachers Non-teachers Total  Remuneration band Teachers Non-teachers Total
228 159 387 £50,000 to £54,999 550 125 675
65 64 129 £55,000 to £59,999 81 98 179
102 58 160 £60,000 to £64,999 75 39 114
84 47 131 £65,000 to £69,999 89 48 137
76 13 89 £70,000 to £74,999 70 24 94
27 19 46 £75,000 to £79,999 70 22 92
9 7 16 £80,000 to £84,999 9 6 15
3 4 7 £85,000 to £89,999 8 5 13
6 1 7 £90,000 to £94,999 2 1 3
1 6 7 £95,000 to £99,999 6 3 9
1 2 3 £100,000 to £104,999 0 2 2
2 4 6 £105,000 to £109,999 4 2 6
0 0 0 £110,000 to £114,999 0 6 6
0 5 5 £115,000 to £119,999 0 0 0
0 0 0 £125,000 to £129,999 0 6 6
0 0 0 £130,000 to £134,999 0 1 1
0 1 1 £135,000 to £139,999 0 0 0
0 2 2 £140,000 to £144,999 0 0 0
0 0 0 £145,000 to £149,999 0 3 3
0 1 1 £170,000 to £174,999 0 0 0
0 0 0 £175,000 to £179,999 0 1 1
604 393 997 964 392 1,356
2024/25 2025/26
In 2025/26, there was one employee that was only included in this table because they left and received a
termination payment (six in 2024/25). 
8. Exit Packages 
The Council has agreed a number of exit packages in 2025/26 as detailed in the table below. The exit packages
agreed were all on a voluntary basis; there were no compulsory redundancies. The Council only agrees exit
packages where they are consistent with wider workforce planning and service delivery objectives; and where the
savings accruing from an individual ceasing employment with the Council are sufficient to pay back the costs of the
exit package within an acceptable period. The assessment of the payback period takes account of the total costs of
the exit package. 
The total exit package costs in the table below include redundancy, pension strain and compensatory lump sum
payments; and also, the notional capitalised costs of compensatory added years. These notional costs are not
Page 163 of 392

Page 164

35 
Annual Accounts 2025/26 PUBLIC
based on actual costs, but are the estimated present value of projected costs over the lifetime of the individuals in
receipt of the exit package, based on the following assumptions:
2025/26 2024/25
Future Life expectancy at age 65 – males 20.8 years 20.5 years
Future Life expectancy at age 65 – females 24.2 years 24.1 years
Pension increase rate 3.00% 2.80%
Discount Rate 6.20% 5.80% 
Value Value
£m £m
£0 - £20,000 0 0.000 6 0.046
£20,001 - £40,000 0 0.000 2 0.059
£40,001 - £60,000 2 0.103 4 0.203
£60,001 - £80,000 0 0.000 2 0.145
£80,001 - £100,000 1 0.083 2 0.176
£100,101 - £150,000 0 0.000 3 0.365
£150,101 - £200,000 2 0.325 3 0.497
£200,001 - £250,000 1 0.239 0 0.000
£350,001 - £400,000 1 0.353 0 0.000
Total 7 1.103 22 1.491
Exit Package Cost
2025/26 2024/25
Number of
Employees
Number of
Employees
Cllr Iain Nicolson Alan Russell
Leader of the Council Chief Executive
Page 164 of 392

Page 165

36 
Annual Accounts 2025/26 PUBLIC
Independent auditor’s report to the members of Renfrewshire Council and
the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
We certify that we have audited the financial statements in the annual accounts of Renfrewshire Council and its
group for the year ended 31 March 2026 under Part VII of the Local Government (Scotland) Act 1973. The financial
statements comprise the Group and Council-only Comprehensive Income and Expenditure Statements,
Movement in Reserves Statements, Balance Sheets, Cash Flow Statements, the Council-only Common Good
Funds Income and Expenditure Statement, the Council-only Common Good Funds Balance Sheet, the Council-
only Housing Revenue Account Income and Expenditure Statement, the Movement on the Housing Revenue
Account Statement, the Council Tax Income Account, and the Non-Domestic Rates Income Account, and notes to
the financial statements, including material accounting policy information. The financial reporting framework that
has been applied in their preparation is applicable law and UK adopted international accounting standards, as
interpreted and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2025/26
(the 2025/26 Code).
In our opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the council and its group as at 31 March 2026 and of
the income and expenditure of the council and its group for the year then ended;
• have been properly prepared in accordance with UK adopted international accounting standards, as
interpreted and adapted by the 2025/26 Code; and
• have been prepared in accordance with the requirements of the Local Government (Scotland) Act
1973, The Local Authority Accounts (Scotland) Regulations 2014, and the Local Government in
Scotland Act 2003. 
Basis for opinion
We conducted our audit in accordance with applicable law and International Standards on Auditing (UK) (ISAs
(UK)), as required by the Code of Audit Practice approved by the Accounts Commission for Scotland. Our
responsibilities under those standards are further described in the auditor’s responsibilities for the audit of the
financial statements section of our report. We were appointed by the Accounts Commission on 18 May 2022. Our
period of appointment is five years, covering 2022/23 to 2026/27. We are independent of the council and its group
in accordance with the ethical requirements that are relevant to our audit of the financial statements in the UK
including the Financial Reporting Council’s Ethical Standard, and we have fulfilled our other ethical
responsibilities in accordance with these requirements. Non-audit services prohibited by the Ethical Standard
were not provided to the council. We believe that the audit evidence we have obtained is sufficient and
appropriate to provide a basis for our opinion.
Conclusions relating to going concern basis of accounting
We have concluded that the use of the going concern basis of accounting in the preparation of the financial
statements is appropriate.
Based on the work we have performed, we have not identified any material uncertainties relating to events or
conditions that, individually or collectively, may cast significant doubt on the ability of the council and its group to
continue to adopt the going concern basis of accounting for a period of at least twelve months from when the
financial statements are authorised for issue.
Page 165 of 392

Page 166

37 
Annual Accounts 2025/26 PUBLIC
These conclusions are not intended to, nor do they, provide assurance on the current or future financial
sustainability of the council and its group. However, we report on the council’s arrangements for financial
sustainability in a separate Annual Audit Report available from the Audit Scotland website.
Risks of material misstatement
We report in our Annual Audit Report the most significant assessed risks of material misstatement that we
identified and our judgements thereon.
Responsibilities of the Director of Finance and the Council for the financial statements
As explained more fully in the Statement of Responsibilities, the Director of Finance and Resources is responsible
for the preparation of financial statements that give a true and fair view in accordance with the financial reporting
framework, and for such internal control as the Director of Finance and Resources determines is necessary to
enable the preparation of financial statements that are free from material misstatement, whether due to fraud or
error.
In preparing the financial statements, the Director of Finance and Resources is responsible for assessing the
ability of the council and its group to continue as a going concern, disclosing, as applicable, matters related to
going concern and using the going concern basis of accounting unless there is an intention to discontinue the
operations of the council and its group.
The Council is responsible for overseeing the financial reporting process.
Auditor’s responsibilities for the audit of the financial statements
Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free
from material misstatement, whether due to fraud or error, and to issue an auditor’s report that includes our
opinion. Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in
accordance with ISAs (UK) will always detect a material misstatement when it exists. Misstatements can arise
from fraud or error and are considered material if, individually or in the aggregate, they could reasonably be
expected to influence the decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. We design procedures
in line with our responsibilities outlined above to detect material misstatements in respect of irregularities,
including fraud. Procedures include:
• using our understanding of the local government sector to identify that the Local Government
(Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations 2014, and the Local
Government in Scotland Act 2003 are significant in the context of the council and its group;
• inquiring of management as to other laws or regulations that may be expected to have a fundamental
effect on the operations of the council and its group;
• inquiring of the management and the Convener of the Audit, Risk and Scrutiny Board concerning the
policies and procedures of the council and its group regarding compliance with the applicable legal
and regulatory framework;
• discussions among our audit team on the susceptibility of the financial statements to material
misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate competence and capabilities to
identify or recognise non-compliance with laws and regulations.
Page 166 of 392

Page 167

38 
Annual Accounts 2025/26 PUBLIC
The extent to which our procedures are capable of detecting irregularities, including fraud, is affected by the
inherent difficulty in detecting irregularities, the effectiveness of the council’s controls, and the nature, timing and
extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that result from error
as fraud may involve collusion, intentional omissions, misrepresentations, or the override of internal control. The
capability of the audit to detect fraud and other irregularities depends on factors such as the skilfulness of the
perpetrator, the frequency and extent of manipulation, the degree of collusion involved, the relative size of
individual amounts manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is located on the
Financial Reporting Council's website www.frc.org.uk/auditorsresponsibilities. This description forms part of our
auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts of the Remuneration Report
We have audited the parts of the Remuneration Report described as audited. In our opinion, the audited parts of
the Remuneration Report have been properly prepared in accordance with The Local Authority Accounts
(Scotland) Regulations 2014.
Other information 
The Director of Finance and Resources is responsible for the other information in the annual accounts. The other
information comprises the Management Commentary, Annual Governance Statement, Statement of
Responsibilities and the unaudited parts of the Remuneration Report. 
Our responsibility is to read all the other information and, in doing so, consider whether the other information is
materially inconsistent with the financial statements or our knowledge obtained in the course of the audit or
otherwise appears to be materially misstated. If we identify such material inconsistencies or apparent material
misstatements, we are required to determine whether this gives rise to a material misstatement in the financial
statements themselves. If, based on the work we have performed, we conclude that there is a material
misstatement of this other information, we are required to report that fact. We have nothing to report in this
regard.
Our opinion on the financial statements does not cover the other information and we do not express any form of
assurance conclusion thereon except on the Management Commentary and Annual Governance Statement to the
extent explicitly stated in the following opinions prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management Commentary and Annual
Governance Statement
In our opinion, based on the work undertaken in the course of the audit:
the information given in the Management Commentary for the financial year for which the financial
statements are prepared is consistent with the financial statements and that report has been prepared in
accordance with statutory guidance issued under the Local Government in Scotland Act 2003; and
the information given in the Annual Governance Statement for the financial year for which the financial
statements are prepared is consistent with the financial statements and that report has been prepared in
accordance with the Delivering Good Governance in Local Government: Framework (2016).
Matters on which we are required to report by exception
We are required by the Accounts Commission to report to you if, in our opinion:
Page 167 of 392

Page 168

39 
Annual Accounts 2025/26 PUBLIC
adequate accounting records have not been kept; or
the financial statements and the audited parts of the Remuneration Report are not in agreement with the
accounting records; or
we have not received all the information and explanations we require for our audit.
We have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to our responsibilities for the annual accounts, our conclusions on the wider scope responsibilities
specified in the Code of Audit Practice, including those in respect of Best Value, are set out in our Annual Audit
Report.
Use of our report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of the Local
Government (Scotland) Act 1973 and for no other purpose. In accordance with paragraph 108 of the Code of Audit
Practice, we do not undertake to have responsibilities to members or officers, in their individual capacities, or to
third parties. 
Rebecca Lister, (for and on behalf of Azets Audit Services),
Quay 2
139 Fountainbridge
Edinburgh
EH3 9QG
Date: 
Page 168 of 392

Page 169

40 
Annual Accounts 2025/26 PUBLIC 
Comprehensive Income and Expenditure Statement
This statement shows the accounting cost of providing services and managing the Council during the year. It
includes, on an accruals basis, all of the Council’s day-to-day expenses and related income. It also includes
transactions measuring the value of non-current assets actually consumed during the year and the real projected
value of retirement benefits earned by employees during the year. The statement shows the accounting cost in
accordance with generally accepted accounting practices, rather than the cost according to the statutory
regulations that specify the net expenditure that Councils need to take into account when setting the annual
Council Tax charge. The required adjustments between accounting basis and funding basis under regulations are
shown in the Movement in Reserves Statement. 
Gross
expenditure
Gross
income
Net
expenditure Note
Gross
expenditure
Gross
income
Net
expenditure
£m £m £m £m £m £m
327.708 (18.179) 309.529 321.085 (17.542) 303.543
201.092 (91.120) 109.972 Environment, Housing and
Infrastructure 243.065 (131.541) 111.524
106.403 (44.855) 61.548 Finance and Resources 100.357 (43.886) 56.471
48.457 (10.357) 38.100 50.385 (10.347) 40.038
13.177 (13.191) (0.014) Miscellaneous Services 17.594 (16.782) 0.812
182.574 (73.487) 109.087 Adult Services 187.721 (73.668) 114.053
879.411 (251.189) 628.222 920.207 (293.766) 626.441
1.033 0.000 1.033 (Gain)/Loss on the disposal
of non-current assets
8 3.107 0.000 3.107
25.807 (5.741) 20.066 Financing and investment
income and expenditure
2 25.739 (2.793) 22.946
0.000 (562.381) (562.381) Taxation and non-specific
grant income
3 0.000 (631.866) (631.866)
906.251 (819.311) 86.940 949.053 (928.425) 20.628
(86.295) 8 (221.173)
0.058 8 (0.179)
(31.118) 27 (15.128)
(117.355) Other comprehensive (income) and expenditure (236.480)
(30.415) Total comprehensive (income) and expenditure (215.852)
(Surplus)/Deficit on the revaluation of non-
current assets
(Surplus)/Deficit from investments in equity
instruments designated as Fair Value through
Other Comprehensive Income
Actuarial (gain)/loss on pension assets and
liabilities
2024/25 2025/26
Children’s Services
Chief Executive’s Service
Deficit on the Provision of Services
Cost of Services
Figures shown in brackets represent income or gains and figures without brackets represent expenditure or losses.
Page 169 of 392

Page 170

41 
Annual Accounts 2025/26 PUBLIC  
Page 170 of 392

Page 171

42 
Annual Accounts 2025/26 PUBLIC
Movement in Reserves Statement
This statement shows the movement in the year on the different reserves held by the Council, analysed into usable
reserves (those reserves that can be applied to fund expenditure or to reduce local taxation) and unusable
reserves. The surplus or deficit on the provision of services line shows the true economic cost of providing the
Council’s services, more details of which are shown in the CIES. These are different from the statutory amounts
required to be charged to the General Fund Balance and the Housing Revenue Account for Council Tax-setting and
dwellings rent-setting purposes. The net increase or (decrease) before transfers to other statutory reserves line
shows the statutory General Fund Balance and the Housing Revenue Account Balance before any discretionary
transfers to or from the other statutory reserves of the Council.
2025/26
General
Fund
Balance
Housing
Revenue
Account
Revenue
statutory
funds
Capital
Funds
Total
Usable
Reserves
Unusable
Reserves
Total
reserves
Note £m £m £m £m £m £m £m
Balance at 1 April 2025 138.771 6.933 3.573 85.920 235.197 1,320.054 1,555.251
Movement in reserves during the year
(10.043) (10.585) 0.000 0.000 (20.628) 236.480 215.852
22.168 16.975 0.000 0.000 39.143 (39.143) 0.000
Transfers to / (from) other
statutory reserves
7 (0.524) 0.000 0.524 0.000 0.000 0.000 0.000
Adjustment for Service
Concession Arrangements
2.047 0.000 0.000 0.000 2.047 (2.047) 0.000
Adjustments between
accounting basis and funding
basis under regulations
6 6.995 (5.350) 0.000 (19.990) (18.345) 18.345 0.000
20.643 1.040 0.524 (19.990) 2.217 213.635 215.852
Balance at 31 March 2026 159.414 7.973 4.097 65.930 237.414 1,533.689 1,771.103
Increase / (Decrease) in year
Total Comprehensive Income and
Expenditure
Adjustments to Usable Reserves
permitted by accounting standards
Comparative movements in
2024/25
General
Fund
Balance
Housing
Revenue
Account
Revenue
statutory
funds
Capital
Funds
Total
usable
reserves
Unusable
reserves
Total
reserves
Note £m £m £m £m £m £m £m
Balance at 1 April 2024 117.620 6.164 3.428 95.007 222.219 1,302.617 1,524.836
Movement in reserves during the year
(70.062) (16.878) 0.000 0.000 (86.940) 117.355 30.415
24.204 14.910 0.000 0.000 39.114 (39.114) 0.000
Transfers to / (from) other
statutory reserves
7 (0.099) 0.000 0.145 (0.046) 0.000 0.000 0.000
Adjustment for Service
Concession Arrangements
13.901 0.000 0.000 0.000 13.901 (13.901) 0.000
Adjustments between
accounting basis and funding
basis under regulations
6 53.207 2.737 0.000 (9.041) 46.903 (46.903) 0.000
21.151 0.769 0.145 (9.087) 12.978 17.437 30.415
Balance at 31 March 2025 138.771 6.933 3.573 85.920 235.197 1,320.054 1,555.251
Increase / (Decrease) in year
Total Comprehensive Income and
Expenditure
Adjustments to Usable Reserves
permitted by accounting standards
Page 171 of 392

Page 172

43 
Annual Accounts 2025/26 PUBLIC
Balance Sheet
The balance sheet shows the value as at 31 March 2026 of the assets and liabilities recognised by the Council. The
net assets of the Council are matched by the reserves held by the Council. Reserves are reported in two categories.
The first category comprises usable reserves, which are reserves that the Council may use to provide services,
subject to the need to maintain a prudent level of reserves and any statutory limitations on their use (for example
the Capital Receipts Reserve, which may only be used to fund capital expenditure or to repay debt). The second
category of reserves comprises those that the Council is not able to use to provide services. This category includes
reserves that hold unrealised gains and losses in the value of assets (for example the Revaluation Reserve), where
amounts would only become available to provide services if the assets are sold, and reserves that hold differences
shown as ‘adjustments between accounting basis and funding basis under regulations’ in the Movement in
Reserves Statement.
As at 31 March
2025
As at 31 March
2026
£m Note £m
1,955.001 Property, plant and equipment 9 2,221.377
44.186 Heritage assets 10 44.186
1.189 Intangible assets 12 0.690
4.391 Long-term investments 21 4.707
2.002 Long-term debtors 18 1.820
2,006.769 2,272.780
2.492 Assets held for sale 11 0.000
17.534 Short-term investments 21 24.623
1.060 Inventories 16 1.165
62.480 Short-term debtors 18 75.104
5.505 Cash and cash equivalents 17 40.800
89.071 141.692
(89.745) Short-term borrowing 21 (71.081)
(70.339) Short-term creditors 19 (112.834)
(0.406) Short-term provisions 20 (0.567)
(160.490) (184.482)
(77.581) Long-term creditors 19 (73.551)
(5.230) Long-term provisions 20 (6.786)
(232.050) Long-term borrowing 21 (314.756)
(65.238) Other long-term liabilities 27 (63.794)
(380.099) (458.887)
1,555.251 1,771.103 Alastair MacArthur
(235.195) Usable reserves 7 (237.414)
(1,320.056) Unusable reserves 8 (1,533.689)
(1,555.251) (1,771.103)Total reserves
Long-term assets
Current assets
Current liabilities
Long-term liabilities
Net assets
Director of Finance
and Resources
The unaudited accounts were issued on 22 June 2026 and the audited accounts were authorised for issue on 24
September 2026.
Page 172 of 392

Page 173

44 
Annual Accounts 2025/26 PUBLIC
Cashflow Statement
This statement shows the changes in cash and cash equivalents of the Council during the year. It shows how the
Council generates and uses cash and cash equivalents by classifying cash flows as operating, investing and
financing activities. The amount of net cash flows arising from operating activities is a key indicator of the extent to
which the operations of the Council are funded by way of taxation and grant income or from the recipients of services
provided by the Council. Investing activities represent the extent to which cash outflows have been made for
resources that are intended to contribute to the Council’s future service delivery. Cash flows arising from financing
activities are useful in predicting claims on future cash flows by providers of capital (that is, borrowing) to the
Council.
2024/25 2025/26
£m £m
(86.940) Net surplus/(deficit) on the provision of services (20.628)
Adjustment for non-cash movements:
125.191 Depreciation, amortisation, impairment and revaluations 106.492
(11.462) Increase/(decrease) in creditors 41.900
4.237 (Increase)/decrease in debtors (12.442)
0.227 (Increase)/decrease in inventories (0.105)
21.876 Pension (liability)/asset 13.684
3.013 Carrying amount of non-current assets sold 7.876
0.285 Other non-cash items charged to the net surplus or deficit on the provision of services 1.717
(25.010) Adjustments for items included in the net surplus or deficit on the provision of services
that are investing and financing activities
(51.332)
31.417 Net cash flows from operating activities 87.162
Net cash flows from investing activities :
(123.212) Purchase of property, plant and equipment, investment property and intangible
assets
(155.489)
(1.980) Proceeds from the sale of property, plant and equipment, investment property and
intangible assets
(3.679)
50.093 Proceeds from short-term and long-term investments (7.226)
27.091 Other receipts from investing activities 55.011
Net cash flows from financing activities
(4.737) Cash payments for the reduction of the outstanding liability relating to right of use
assets and on-balance sheet PFI /PPP contracts
(4.526)
(2.628) Repayment of short-term and long-term borrowing 64.042
(23.956) Net increase/(decrease) in cash and cash equivalents 35.295
29.461 Cash and cash equivalents at the beginning of the reporting period 5.505
5.505 Cash and cash equivalents at the end of the reporting period 40.800
The Net cash flow from operating activities above includes the following elements of interest paid and received:
2024/25 2025/26
£m £m
(5.741) Interest received (2.793)
16.213 Interest paid 15.883
4.919 Interest element of right of use and PPP payments 4.663
15.391 17.753
Interest Paid and Received
Page 173 of 392

Page 174

45 
Annual Accounts 2025/26 PUBLIC
Note 1: Expenditure and Funding Analysis
The Expenditure and Funding Analysis shows how annual expenditure is used and funded from resources
(government grants, rents, Council Tax and non-domestic rates) by the Council in comparison with those
resources consumed or earned by the Council in accordance with generally accepted accounting practices.  It also
shows how this expenditure is allocated for decision making purposes between the Council’s service departments. 
Income and expenditure accounted for under generally accepted account practices is presented more fully in the
CIES.
2025/26
Net Expenditure
chargeable to the
General Fund and
HRA
Adjustments
between Funding
and Accounting
basis
Depreciation
charged to
Revaluation
Reserve
Net
Expenditure in
the CIES
£m £m £m £m
Children's Services 275.837 14.050 13.656 303.543
Environment, Housing and Infrastructure 77.006 15.118 19.400 111.524
Finance & Resources 50.893 4.019 1.559 56.471
Chief Executive's Service 30.195 5.551 4.292 40.038
Miscellaneous Services 18.243 (17.667) 0.236 0.812
Adult Services 112.122 1.931 0.000 114.053
Net cost of services 564.296 23.002 39.143 626.441
Other income and expenditure (585.981) (19.832) 0.000 (605.813)
(Surplus) / Deficit (21.685) 3.170 39.143 20.628
Opening General Fund and HRA balance (145.702)
Less (Surplus) / Deficit in the year (21.685)
Closing General Fund and HRA at 31
March 2026 (167.387)
2025/26 Adjustments
for capital
purposes
Net change for
the pensions
adjustments
Other
differences
Total
Adjustments
£m £m £m £m
Children's Services 18.485 3.782 (8.217) 14.050
Environment, Housing and Infrastructure 14.238 4.347 (3.467) 15.118
Finance & Resources 1.882 2.202 (0.065) 4.019
Chief Executive's Service 4.907 0.792 (0.148) 5.551
Miscellaneous Services 1.303 (3.537) (15.433) (17.667)
Adult Services 0.003 2.069 (0.141) 1.931
Net Cost of Services 40.818 9.655 (27.471) 23.002
Other income and expenditure (51.381) 4.029 27.520 (19.832)
Total adjustments between accounting basis and
funding basis (10.563) 13.684 0.049 3.170
• Adjustments for capital purposes: adds in depreciation, impairment and revaluation gains and losses to the
service net expenditure including income on the disposal of assets and the amounts written off for those assets
and the statutory charges for capital financing and capital grants which are not chargeable under generally
accepted accounting practices.
• Net change for the pensions adjustments: removes employer pension contributions as allowed by statute and
replaces with the current and past service costs within the IAS 19 employee benefits pension related
Page 174 of 392

Page 175

46 
Annual Accounts 2025/26 PUBLIC
expenditure and income.  The net interest on the defined benefit liability is also included as charged to the
CIES.
• Other differences: any other differences between those amounts debited or credited to the CIES and amounts
payable or receivable to be recognised under statute, including those primarily involved in the financial
instruments adjustment account, the employee statutory adjustment account and other statutory funds.  Any
other non-statutory adjustments would also be included here. 
2024/25
Net Expenditure
chargeable to the
General Fund and
HRA
Adjustments between
Funding and
Accounting basis
Depreciation
charged to
Revaluation
Reserve
Net Expenditure
in the CIES
£m £m £m £m
Children's Services 257.721 34.850 16.958 309.529
Communities and Housing Services 69.902 22.675 17.395 109.972
Environment & Infrastructure 47.537 12.088 1.923 61.548
Finance & Resources 28.330 7.155 2.615 38.100
Chief Executive's Service 25.322 (25.559) 0.223 (0.014)
Miscellaneous Services 106.810 2.277 0.000 109.087
Net cost of services 535.622 53.486 39.114 628.222
Other income and expenditure (543.643) 1.271 0.000 (541.282)
(Surplus) / Deficit (8.021) 54.757 39.114 86.940
Opening General Fund and HRA balance (123.784)
Less (Surplus) / Deficit in the year (8.021)
Add other items not charged to the Surplus / (Deficit) (13.897)
Closing General Fund and HRA at 31
March 2025 (145.702)
* For a split of this balance between the General Fund and the HRA, see the Movement in Reserves Statement.
2024/25
Adjustments
for capital
purposes
Net change for
the pensions
adjustments
Other
differences
Total
Adjustments
£m £m £m £m
Children's Services 38.142 6.372 (9.664) 34.850
Environment, Housing and Infrastructure 19.208 7.021 (3.554) 22.675
Finance & Resources 2.208 3.738 6.142 12.088
Chief Executive's Service 5.965 1.389 (0.199) 7.155
Miscellaneous Services (6.350) (4.755) (14.454) (25.559)
Adult Services 0.003 4.097 (1.823) 2.277
Net cost of services 59.176 17.862 (23.552) 53.486
Other income and expenditure (27.119) 4.014 24.376 1.271
Total adjustments between accounting basis and
funding basis 32.057 21.876 0.824 54.757
Page 175 of 392

Page 176

47 
Annual Accounts 2025/26 PUBLIC
Note 2: Financing and investment income & expenditure 
2024/25 2025/26
£m £m
21.793 Interest payable and similar charges 21.710
4.014 Net interest on the net defined benefit liability 4.029
(5.741) Interest receivable and similar income (2.793)
20.066 Total 22.946 
Note 3: Taxation and non-specific grant income 
2024/25 2025/26
£m £m
(97.701) Income from Council Tax and community charge (108.204)
(107.505) Distribution from the national non-domestic rate pool (108.844)
(330.084) General Revenue Grant from the Scottish Government (359.807)
(27.091) Capital grants and contributions (55.011)
(562.381) Total (631.866) 
Note 4: Expenditure and income analysed by nature 
This note presents the subjective analysis of expenditure and income shown by operational service area in the
CIES. 
2024/25 2025/26
£m Note £m
Expenditure
381.264 Employee benefits expenses 395.348
412.071 Other service expenses 418.371
86.076 Depreciation, amortisation, impairment 106.491
25.807 Interest Payments 2 25.736
1.033 (Gain) /Loss on the disposal of assets 8 3.107
906.251 Total expenditure 949.053
Income
(251.189) Fees, charges and other service income (293.767)
(5.741) Interest and investment income 2 (2.793)
(205.206) Income from council tax and non-domestic rates 3 (217.048)
(357.175) Government grants and contributions 3 (414.817)
(819.311) Total income (928.425)
86.940 (Surplus) or deficit on the provision of services 20.628 
Page 176 of 392

Page 177

48 
Annual Accounts 2025/26 PUBLIC
Note 5: Grant income 
The Council credited the following grants, contributions and donations direct to services in the CIES during
2025/26.   
2024/25 2025/26
£m £m
37.802 Housing benefit 29.325
0.643 Housing benefit and Council Tax administration 0.653
1.029 Discretionary Housing Payment 0.486
0.600 Private sector housing grant 0.750
0.460 Education Maintenance Allowance 0.421
0.000 Gaelic Education 0.065
0.021 School Milk 0.451
4.663 Pupil Equity Fund 4.663
6.620 Other Education 3.788
3.363 Justice Social Work 4.404
12.254 Adult Services 12.254
2.369 Employability 4.167
3.526 Other grants 8.355
73.350 Total 69.782
Page 177 of 392

Page 178

49 
Annual Accounts 2025/26 PUBLIC
Note 6: Adjustment between accounting basis and funding basis under
regulations
This note details the adjustments that are made to the total comprehensive income and expenditure recognised by
the Council in the year in accordance with proper accounting practice to the resources that are specified by
statutory provisions as being available to the Council to meet future capital and revenue expenditure. 
The first table outlines the current year position, and the second table outlines the comparative prior year position. 
General
Fund
Balance
Housing
Revenue
Account
Balance
Capital
Statutory
Funds
Capital
Receipts
Reserve
£m £m £m £m £m
Reversal of items charged to the CIES:
Charges for depreciation and impairment of non-current
assets
(49.173) (17.293) 0.000 0.000 66.466
Amortisation of intangible assets (0.883) 0.000 0.000 0.000 0.883
Capital grants and contributions applied 44.922 10.089 0.000 0.000 (55.011)
Revenue expenditure funded from capital under statute (0.523) 0.000 0.000 0.000 0.523
Amounts of non-current assets written off on disposal or
sale as part of the gain or loss on disposal to the CIES
(2.947) (0.160) 0.000 0.000 3.107
Insertion of items not charged to the CIES:
Statutory provision for the repayment of Loans Fund &
Finance Lease  principal 5.597 7.969 0.000 0.000 (13.566)
Capital expenditure charged against the General Fund
and HRA Balances
8.888 5.602 18.626 0.000 (33.116)
Transfer of cash sale proceeds credited as part of the gain
or loss on disposal to the CIES
0.000 0.000 0.000 (3.679) 3.679
Use of the Capital Receipts Reserve to finance new
capital expenditure
0.000 0.000 0.000 5.043 (5.043)
Amount by which finance costs charged to the CIES are
different from finance costs chargeable in the year in
accordance with statutory requirements
0.298 0.104 0.000 0.000 (0.402)
Reversal of items relating to retirement benefits debited
or credited to the CIES
(29.351) (1.659) 0.000 0.000 31.010
Employer’s pension contributions  and direct payments to
pensioners payable in the year
16.685 0.641 0.000 0.000 (17.326)
Amount by which officer remuneration charged to the
CIES on an accruals basis is different from remuneration
chargeable in the year in accordance with statutory
requirements
(0.508) 0.057 0.000 0.000 0.451
Total adjustments (6.995) 5.350 18.626 1.364 (18.345)
Usable reserves
Unusable
reserves2025/26
Adjustment primarily involving the Employee Statutory Adjustment Account:
Adjustments primarily involving the Pension Reserve:
Adjustment primarily involving the Financial Instruments Adjustment Account:
Adjustments primarily involving the Capital Receipts Reserve:
Adjustments primarily involving the Capital Adjustment Account:
Page 178 of 392

Page 179

50 
Annual Accounts 2025/26 PUBLIC
General
Fund
Balance
Housing
Revenue
Account
Capital
Statutory
Funds
Capital
Receipts
Reserve
£m £m £m £m £m
Reversal of items charged to the CIES:
Charges for depreciation and impairment of non-current
assets
(67.936) (17.292) 0.000 0.000 85.228
Amortisation of intangible assets (0.848) 0.000 0.000 0.000 0.848
Capital grants and contributions applied 25.080 2.112 0.000 0.000 (27.192)
Revenue expenditure funded from capital under statute (0.352) 0.000 0.000 0.000 0.352
Amounts of non-current assets written off on disposal or
sale as part of the gain or loss on disposal to the CIES
(1.015) (0.018) 0.000 0.000 1.033
Insertion of items not charged to the CIES:
Statutory provision for the repayment of Loans Fund &
Finance Lease  principal
3.893 9.105 0.000 0.000 (12.998)
Capital expenditure charged against the General Fund
and HRA Balances
9.557 4.567 7.008 0.000 (21.132)
Transfer of cash sale proceeds credited as part of the gain
or loss on disposal to the CIES
0.000 0.000 0.000 (1.980) 1.980
Use of the Capital Receipts Reserve to finance new
capital expenditure
0.000 0.000 0.000 4.013 (4.013)
Amount by which finance costs charged to the CIES are
different from finance costs chargeable in the year in
accordance with statutory requirements
0.298 0.107 0.000 0.000 (0.405)
Reversal of items relating to retirement benefits debited
or credited to the CIES
(38.880) (1.958) 0.000 0.000 40.838
Employer’s pension contributions  and direct payments to
pensioners payable in the year
18.357 0.605 0.000 0.000 (18.962)
Amount by which officer remuneration charged to the
CIES on an accruals basis is different from remuneration
chargeable in the year in accordance with statutory
requirements
(1.361) 0.035 0.000 0.000 1.326
Total adjustments (53.207) (2.737) 7.008 2.033 46.903
Adjustments primarily involving the Capital Receipts Reserve:
Adjustment primarily involving the Financial Instruments Adjustment Account:
Adjustments primarily involving the Pension Reserve:
Adjustment primarily involving the Employee Statutory Adjustment Account:
Adjustments primarily involving the Capital Adjustment Account:
Usable reserves
Unusable
reserves2024/25
Note 7: Usable reserves 
Usable reserves are those reserves the Council is able to apply to fund expenditure or reduce taxation and
comprise both capital and revenue reserves. Movements in the revenue reserves during the year are outlined in the
Movement in Reserves Statement and a summary is shown in below. 
More information about the Housing Revenue Account can be found on page 100.
Page 179 of 392

Page 180

51 
Annual Accounts 2025/26 PUBLIC
As at 31
March 2025
As at 31
March 2026
£m £m
(138.769) General Fund Balance (159.414)
(6.933) Housing Revenue Account Balance (7.973)
(5.485) Capital Receipts Reserve (4.122)
(84.008) Other Statutory Funds (65.905)
(235.195) Total (237.414)
Usable Reserves
This note sets out the amounts set aside from the General Fund Balance in statutory funds established under
Schedule 3 of the Local Government (Scotland) Act 1975 to provide financing for specific areas of expenditure, and
the amounts transferred back from these funds to meet General Fund expenditure in 2025/26.
Balance at
1 April 2024
Transfers
out
Transfers
in
Balance at
31 March
2025
Transfers
out
Transfers
in
Balance at
31 March
2026
£m £m £m £m £m £m £m
Insurance Fund 2.901 0.000 0.128 3.029 0.000 0.137 3.166
DHN Repair and Renewal Fund 0.186 0.000 0.000 0.186 0.000 0.372 0.558
Reservoir Repair Fund 0.341 0.000 0.017 0.358 0.000 0.015 0.373
Revenue statutory funds 3.428 0.000 0.145 3.573 0.000 0.524 4.097
Education Capital Items Fund 1.454 (0.279) 0.232 1.407 (0.275) 0.285 1.417
Investment Capital Fund 86.035 (8.714) 1.707 79.028 (21.630) 2.993 60.391
Capital statutory funds 87.489 (8.993) 1.939 80.435 (21.905) 3.278 61.808
Total 90.917 (8.993) 2.084 84.008 (21.905) 3.802 65.905
• The Insurance Fund is the funding mechanism for the control of insurable risk and covers the main classes of
insurance. It is earmarked for premiums and self-funded insurance costs.
• The DHN Repair and Renewal Fund is earmarked for future component replacement of the District Heating
Network at the Advanced Manufacturing Innovation District Scotland (AMIDS).
• The Reservoir Repair Fund is funding received from a contractor for repairs in perpetuity to the Thornly Dam.
• The Education Capital Items Fund is earmarked funding for specific schools to be used in future years for
planned purchases of a capital nature, such as computers and information communication technology
equipment.
• The Investment Capital Fund represents planned funding earmarked to support the Council’s investment
programme and the wider strategic management of the Council’s associated debt profile.
• In addition to the capital statutory funds above the Capital Receipts Reserve is also a statutory fund. The Capital
Receipts Reserve holds cash receipts from asset sales and is used to fund planned capital expenditure.
Balance at
1 April 2024
Sale
proceeds
Capital exp
funded
Balance at
31 March
2025
Sale
proceeds
Capital exp
funded
Balance at
31 March
2026
£m £m £m £m £m £m £m
Capital Receipts Reserve 7.518 1.980 (4.013) 5.485 3.679 (5.042) 4.122
Page 180 of 392

Page 181

52 
Annual Accounts 2025/26 PUBLIC
The following note sets out the amounts within the General Fund Balance that the Council has ring-fenced for
future expenditure plans.  The unallocated balance of £11.476m represents 2.0% of the Council’s net annual
running costs.
Balance at
1 April 2024
Transfers
out
Transfers
in
Balance at
31 March
2025
Transfers
out
Transfers
in
Balance at
31 March
2026
£m £m £m £m £m £m £m
Alcohol and Drugs Commission 0.767        (0.139)       -          0.628        (0.628)       -          -          
City Deal 1.903        (1.007)       0.654        1.550        (0.577)       0.745        1.718        
Civil Contingencies Shared Service 0.126        (0.032)       0.025        0.119        (0.034)       -          0.085        
Clydeplan Unfunded Pension -          -          -          -          (0.011)       0.157        0.146        
Connected Communities -          -          -          -          -          0.215        0.215        
Culture Bid Legacy 2.009        (0.621)       0.438        1.826        (0.657)       0.208        1.377        
Development Contribution – Paisley Town Centre0.519        (0.265)       -          0.254        -          1.200        1.454        
Digital Infrastructure 1.441        (1.000)       -          0.441        -          -          0.441        
Early Years Change Fund 2.100        -          -          2.100        -          -          2.100        
Employability 10.590     -          0.110        10.700     (0.375)       -          10.325      
Environment & Infrastructure 0.790        (0.250)       0.300        0.840        (0.006)       0.113        0.947        
Fairer Renfrewshire Programme 2.855        (0.542)       0.023        2.336        (1.089)       0.410        1.657        
Financial Sustainability Fund 13.244     (5.116)       13.069     21.197     (1.374)       16.010     35.833      
Fly Tipping Enforcement -          (0.200)       0.250        0.050        (0.050)       -          -          
Homelessness (Housing First) -          -          -          -          -          0.337        0.337        
Investment Zone Funding -          -          -          -          -          0.908        0.908        
Learning Estate Support Fund -          -          2.000        2.000        (0.291)       2.200        3.909        
Leisure: Inclusive Play Facility 0.007        -          -          0.007        (0.007)       -          -          
Loan Charges Flexibility Fund 48.759     -          14.897     63.656     -          1.000        64.656      
Local Authority Economic Recovery 0.100        -          -          0.100        (0.100)       -          -          
Local Heat and Energy Efficiency -          -          0.036        0.036        (0.036)       0.014        0.014        
Local Place Plans -          -          -          -          (0.059)       0.100        0.041        
Oakshaw Heritage Trail -          -          0.050        0.050        (0.050)       -          -          
Paisley Town Centre Heritage Asset 0.334        (0.334)       -          -          -          -          -          
Planning Enforcement -          -          0.120        0.120        (0.022)       -          0.098        
Private Sector Housing Grant 2.308        (0.141)       -          2.167        -          0.780        2.947        
Pupil Equity Fund 0.524        -          0.137        0.661        (0.131)       -          0.530        
Resettlement and Asylum Fund 1.429        (0.537)       0.247        1.139        (1.290)       0.151        -          
School Music Participation 0.276        (0.179)       0.162        0.259        -          0.021        0.280        
Service Modernisation and Reform 10.662     (0.756)       0.269        10.175     (1.436)       3.839        12.578      
Sustainable Communities Fund 0.394        (0.163)       0.028        0.259        -          0.026        0.285        
Villages Improvement Fund 0.200        (0.064)       -          0.136        (0.038)       -          0.098        
Welfare Reform 0.999        (0.713)       0.666        0.952        (0.585)       0.086        0.453        
Year end flexibility:
Children's Services 5.005        (2.110)       1.837        4.732        (0.677)       0.451        4.506        
General Fund: Ring-fenced 107.341 (14.169) 35.318 128.490 (9.523) 28.971 147.938
Unallocated Balance 10.279     -          10.279 -          1.197        11.476
Total General Fund Balance 117.620 (14.169) 35.318 138.769 (9.523) 30.168 159.414
Housing Revenue Account 6.164        (0.298)         1.067 6.933        (1.013)         2.053 7.973
Ring-fenced elements of the
General Fund Balance
Page 181 of 392

Page 182

53 
Annual Accounts 2025/26 PUBLIC
Note 8: Unusable reserves 
Unusable reserves are those reserves that the Council is not able to utilise to provide services, and comprise: 
• Reserves that hold unrealised gains and losses, particularly in relation to the revaluation of property, plant and
equipment and financial instruments, where amounts will only become available to provide services (or limit
resources in the case of losses) once the gains or losses are realised as the assets are disposed of. This
category of reserves comprises the Revaluation Reserve and the Financial Instruments Revaluation Reserve.
• Adjustment accounts that deal with situations where income and expenditure are recognised according to
statutory regulations against the General Fund Balance and the Housing Revenue Account Balance on a
different basis from that expected by generally accepted accounting practices. These adjustment accounts will
carry either a debit balance (showing that the Council is required by statute to fund its expenditure more slowly
than accounting standards would expect) or a credit balance (where the Council has set resources aside under
statute earlier than accounting standards require). The adjustment accounts effectively offset the General Fund
Balance and the Housing Revenue Account Balance to give the Council more or less spending power in the short
term than proper accounting practices would allow. The adjustment accounts comprise the Capital Adjustment
Account, the Financial Instruments Adjustment Account, the Capital Receipts Reserve, the Pension Reserve
and the Employee Statutory Adjustment Account.
As at 31
March 2025
As at 31
March 2026
£m £m
(813.454) Revaluation Reserve (991.009)
65.238 Pension Reserve 63.794
(589.856) Capital Adjustment Account (624.360)
10.283 Financial Instruments Adjustment Account 9.881
(0.500) Financial Instruments Revaluation Reserve (0.679)
8.233 Employee Statutory Adjustment Account 8.684
(1,320.056) Total Unusable Reserves (1,533.689)
Unusable Reserves
Revaluation Reserve 
The Revaluation Reserve contains the gains made by the Council arising from increases in the value of its non-
current assets. The balance is reduced when assets with accumulated gains are: 
i) revalued downwards or impaired and the gains are lost, 
ii) used in the provision of services and the gains are consumed through depreciation; or 
iii) disposed of and the gains are realised. 
The Revaluation Reserve contains only revaluation gains accumulated since 1 April 2007, which was the date that
the Revaluation Reserve was created. Accumulated gains arising before that date are consolidated into the
balance on the Capital Adjustment Account. 
Page 182 of 392

Page 183

54 
Annual Accounts 2025/26 PUBLIC
As at 31
March 2025
As at 31
March 2026
£m £m
(768.193) Balance at 1 April (813.454)
(86.293) Upward revaluation of non-current assets (221.173)
39.114 Difference between fair value depreciation and historic cost depreciation 39.145
1.918 Accumulated (gains) / losses on disposal of non-current assets transferred to the
Capital Adjustment Account
4.473
(45.261) Movement in Year (177.555)
(813.454) Balance at 31 March (991.009)
Revaluation Reserve
Pension Reserve 
The Pension Reserve absorbs the timing differences arising from the different arrangements for accounting for
post-employment benefits and for funding benefits in accordance with statutory provisions or regulations. The
Council accounts for post-employment benefits in the CIES as the benefits are earned by employees accruing
years of service, updating the liabilities recognised to reflect inflation, changing assumptions and investment
returns on any resources set aside to meet the costs. However, statutory arrangements require benefits earned to
be financed as the Council makes employer’s contributions to pension funds. The debit balance on the Pension
Reserve shows a significant shortfall in the benefits earned by past and current employees and the Council’s share
of Strathclyde Pension Fund resources available to meet them. The statutory arrangements will ensure that funding
will have been set aside by the time the benefits come to be paid. 
As at 31
March 2025
As at 31
March 2026
£m £m
74.480 Balance at 1 April 65.238
(787.413) Actuarial (gains) / losses on pension assets and liabilities (880.441)
756.295 Restriction to Asset Ceiling 865.313
40.838 Reversal of items relating to retirement benefits debited or credited to the surplus
or deficit on the provision of services in the CIES
31.010
(1.383) Effect of business combinations and disposals 0.000
(17.579) Employer’s pension contributions payable in the year (17.326)
65.238 Balance at 31 March 63.794
Pension Reserve
Capital Adjustment Account 
The Capital Adjustment Account absorbs the timing differences arising from the different arrangements for
accounting for the consumption of non-current assets and for financing the acquisition, construction or
enhancement of those assets. The Capital Adjustment Account is debited with the cost of acquisition,
construction or enhancement as depreciation, impairment losses and amortisations are charged to the CIES (with
reconciling postings from the Revaluation Reserve to convert fair value figures to a historical cost basis). The
Capital Adjustment Account is credited with the amounts set aside by the Council as finance for the costs of
acquisition, construction and enhancement. 
Page 183 of 392

Page 184

55 
Annual Accounts 2025/26 PUBLIC
The Capital Adjustment Account contains accumulated gains and losses on investment properties and gains
recognised on donated assets that have yet to be consumed by the Council, and also revaluation gains
accumulated on property, plant and equipment before 1 April 2007. The Revaluation Reserve was created to hold
such gains arising from 1 April 2007 onwards. 
As at 31
March 2025
As at 31
March 2026
£m £m
(625.941) Balance at 1 April (589.856)
Reversal of items relating to capital expenditure charged to the CIES:
85.228 Charges for depreciation, impairment and revaluation losses of non-current assets 66.466
0.848 Amortisation of intangible assets 0.883
0.352 Revenue expenditure funded from capital under statute 0.523
1.980 Non-current assets sale proceeds 3.679
1.033 (Gain)/Loss on disposal of non-current assets charged to the CIES 3.107
(1.918) Adjusting amounts written out of the Revaluation Reserve (4.473)
87.523 Net written out amount of non-current assets consumed in the year 70.185
Capital financing applied in the year:
(4.013) Use of the Capital Receipts Reserve to finance new capital expenditure (5.043)
(27.192) Capital grants and contributions credited to the CIES that have been applied to
capital financing
(55.011)
(14.404) Loans Fund and Finance Lease principal repayments (13.566)
(21.132) Capital expenditure charged against the General Fund and Housing Revenue
Account balances
(33.116)
15.303 Adjustment for Service Concession Arrangements 2.047
(51.438) (104.689)
(589.856) Balance at 31 March (624.360)
Capital Adjustment Account
Financial Instruments Adjustment Account 
The Financial Instruments Adjustment Account absorbs the timing differences arising from the different
arrangements for accounting for income and expenses relating to certain financial instruments, and for bearing
losses or benefiting from gains in accordance with statutory provisions [or regulations]. The Council uses the
Financial Instruments Adjustment Account to:
• Manage premiums incurred on the early repayment of borrowings. Generally accepted accounting practices
require that premiums are debited to the CIES when they are incurred (except where the loan debt being repaid
is exchanged for new loan debt on substantially similar terms). However, statutory arrangements or regulations
allow any premiums that would normally require to be to be taken immediately to the surplus or deficit on the
provision of services, to be amortised to the General Fund Balance over the various periods of time as specified
in the regulations/statutory guidance. Furthermore, statutory arrangements [or regulations] require that any
premiums that were on the Council’s balance sheet at 31 March 2007 be amortised to the General Fund
Balance over the unexpired term that was outstanding on the associated loans when they were redeemed. The
Council had various premiums totalling £17.630m at 31 March 2007 and, under the statutory arrangements,
these will be fully amortised to the General Fund Balance by financial year 2053-2054.
• Manage borrowings that were on the Council’s balance sheet at 31 March 2007 and that have a stepped interest
rate feature. These borrowings comprise four ‘lender option borrower option’ (LOBO) loans for which the
Page 184 of 392

Page 185

56 
Annual Accounts 2025/26 PUBLIC
interest rate was fixed for an initial period, and at a pre-agreed later date the interest rate changed. Generally
accepted accounting practices require that interest charges relating to borrowings that have a stepped interest
rate feature are debited to the CIES on the basis of a single effective interest rate (EIR) over the expected life of
the loans, rather than based on the contractual cash outflows of interest. However, statutory arrangements [or
regulations] allow such borrowings that were on the Council’s balance sheet at 31 March 2007 to be charged to
the General Fund Balance in accordance with the accounting treatment prior to 1 April 2007, which did not
require the use of the effective interest rate as the basis for the interest charge.
• Manage ‘soft loans’ that were on the Council’s balance sheet at 31 March 2007. Soft loans are loans advanced
by the Council at nil or below prevailing interest rates. Generally accepted accounting practices require that the
discounted interest rate is recognised as a reduction in the fair value of the loan, with the difference being
debited to the CIES as service expenditure. However, statutory arrangements [or regulations] require that, for
soft loans on the Council’s balance sheet at 31 March 2007, the reduction in value and corresponding charge to
be reversed, so that there is no impact on the General Fund Balance. As at 31 March 2007 interest free loans
amounting to £0.156m had been advanced to employees who had had changes implemented to their pay cycle.
These loans are repayable when employees leave the Council’s employment. 
Refinancing
premiums
and discounts
Borrowing on
stepped
interest rate
loans
Loans to third
parties at less
than market
rate
Total
£m £m £m £m
Balance at 1 April 2025 9.219 1.053 0.011 10.283
Premiums incurred in previous financial years to be
charged against the General Fund Balance in
accordance with statutory requirements
(0.389) 0.000 0.000 (0.389)
Amount by which finance costs charged to the CIES are
different from finance costs chargeable in the year in
accordance with statutory requirements
0.000 (0.013) 0.000 (0.013)
Balance at 31 March 2026 8.830 1.040 0.011 9.881
Financial Instruments Adjustment Account
Financial Instruments Revaluation Reserve
The Financial Instruments Revaluation Reserve contains the gains made by the Council arising from increases in
the value of its investments that are measured at fair value through other comprehensive income.  
The balance is reduced when investments with accumulated gains are:
i) revalued downwards or impaired and the gains are lost; or 
ii) disposed of and the gains are realised.
As at 31
March 2025
As at 31
March 2026
£m £m
(0.558) Balance at 1 April (0.500)
0.058 Downward/(Upward) revaluation of investments (0.179)
(0.500) Balance at 31 March (0.679)
Financial Instruments Revaluation Reserve
Page 185 of 392

Page 186

57 
Annual Accounts 2025/26 PUBLIC
Employee Statutory Adjustment Account 
The Employee Statutory Adjustment Account absorbs the differences that would otherwise arise on the General
Fund Balance from accruing for short-term accumulating compensated absences at the end of the financial year. 
As at 31
March 2025
As at 31
March 2026
£m £m
6.907 Balance at 1 April 8.233
(6.907) Settlement or cancellation of accrual made at the end of the prior year (8.233)
8.233 Amounts accrued at the end of the current year 8.684
8.233 Balance at 31 March 8.684
Employee Statutory Adjustment Account
Note 9: Property, Plant and Equipment 
The Code requires that where a component of an asset is replaced, the carrying amount (i.e. net book value) of the
old component shall be derecognised to avoid double counting and the new component is reflected in the carrying
amount of the infrastructure asset. However, due to practical difficulties in applying component accounting for the
recognition and derecognition of replaced components of infrastructure assets, most local authorities have been
unable to comply with the requirement to assess the net book value of the replaced component and have treated
the amount of the replaced component as zero, because the replaced component is considered to have been fully
used up at the point that it is replaced. 
In recognition of this difficulty, the Scottish Government issued a Statutory Override in August 2022. Finance
circular 6/2025 extended the temporary measures until 31 March 2027. Renfrewshire Council has elected to apply
both of the following provisions: 
• Statutory Override 1: For accounting periods commencing from 1 April 2021 until 31 March 2027 a local
authority is not required to report the gross cost and accumulated depreciation for infrastructure assets.
• Statutory Override 2: For accounting periods commencing from 1 April 2010 until 31 March 2027 the carrying
amount to be derecognised in respect of a replaced part of an infrastructure asset is required to be a nil
amount, and no subsequent adjustment shall be made to the carrying amount of the asset with respect to that
part.
Page 186 of 392

Page 187

58 
Annual Accounts 2025/26 PUBLIC
Note 9: Property, Plant and Equipment (continued) 
Council
dwellings
Other land
and
buildings
Vehicles,
plant,
furniture and
equipment
Infrastructure
assets
Assets under
construction
Surplus
assets Total
Of which
funded by
PPP/ROU
£m £m £m £m £m £m £m £m
Balance sheet net carrying amount at 31 March 2025 844.137 612.096 45.018 235.476 196.036 22.238 1,955.001 116.964
Other Reclassifications 0.000 (1.572) 0.753 108.697 (107.878) 0.000 0.000 0.000
Additions 38.544 4.764 10.857 15.875 85.065 0.000 155.105 3.937
Disposals (0.832) (2.995) (0.009) 0.000 0.000 (0.458) (4.294) 0.000
Depreciation (33.317) (42.967) (7.455) (12.591) 0.000 (0.121) (96.451) (9.441)
Revaluation adjustments taken to the Revaluation Reserve 196.636 21.350 (0.079) 0.000 0.000 3.266 221.173 0.000
Revaluation adjustments recognised in the CIES 0.000 (7.829) 0.000 0.000 0.000 (1.328) (9.157) (1.081)
Balance sheet net carrying amount at 31 March 2026 1,045.168 582.847 49.085 347.457 173.223 23.597 2,221.377 110.379
Gross carrying amount at 31 March 2026 1,045.168 685.051 127.227 n/a 173.223 25.890 2,056.559 126.772
Accumulated depreciation at 31 March 2026 0.000 (102.204) (78.142) n/a 0.000 (2.293) (182.639) (16.393)
Infrastructure Assets 0.000 0.000 0.000 347.457 0.000 0.000 347.457 0.000
Balance sheet net carrying amount at 31 March 2026 1,045.168 582.847 49.085 347.457 173.223 23.597 2,221.377 110.379
Movements in 2025/26
Page 187 of 392

Page 188

59 
Annual Accounts 2025/26 PUBLIC
Council
dwellings
Other land
and
buildings
Vehicles,
plant,
furniture and
equipment
Infrastructure
assets
Assets under
construction
Surplus
assets Total
Of which
funded by
PFI
£m £m £m £m £m £m £m £m
Balance sheet net carrying amount at 31 March 2024 766.932 643.505 47.638 228.036 149.695 22.415 1,858.221 107.508
Reclassified (to)/ from Assets Held for Sale 0.000 0.000 (2.492) 0.000 0.000 0.000 (2.492) 0.000
Other Reclassifications* 5.918 3.440 (0.042) 0.464 (10.869) (0.001) (1.090) 0.000
Recognition of Right of Use Assets and Increase in PPP
liability 0.000 20.136 0.659 0.000 0.000 0.000 20.795 20.215
Additions 27.532 5.067 7.914 18.604 60.144 0.179 119.440 2.991
Disposals (1.204) (0.310) (0.005) 0.000 0.000 (0.304) (1.823) 0.000
Depreciation (31.260) (44.541) (9.226) (11.628) 0.000 (0.121) (96.776) (8.809)
Impairment adjustments recognised in the CIES 0.000 0.000 0.000 0.000 (2.934) 0.000 (2.934) 0.000
Revaluation adjustments taken to the Revaluation Reserve 76.219 9.601 0.406 0.000 0.000 0.067 86.293 11.454
Revaluation adjustments recognised in the CIES 0.000 (24.802) 0.166 0.000 0.000 0.003 (24.633) (16.395)
Balance sheet net carrying amount at 31 March 2025 844.137 612.096 45.018 235.476 196.036 22.238 1,955.001 116.964
Gross carrying amount at 31 March 2025 844.137 698.658 127.029 n/a 196.036 27.450 1,893.310 142.166
Accumulated depreciation at 31 March 2025 0.000 (86.562) (82.011) n/a 0.000 (5.212) (173.785) (25.202)
Infrastructure Assets 0.000 0.000 0.000 235.476 0.000 0.000 235.476 0.000
Balance sheet net carrying amount at 31 March 2025 844.137 612.096 45.018 235.476 196.036 22.238 1,955.001 116.964
Movements in 2024/25 (restated)
*During 2024/25 the Council reclassified £1.090m of property from Council assets to the Paisley Common Good Fund (£0.285m) and the Renfrew Common Good Fund (£0.805m). This reclassification was
undertaken following a review of historical title and legal advice confirming the assets formed part of the Common Good. 
Following a review of the Council’s asset componentisation policy in line with the CIPFA Code of Practice on Local Authority Accounting, certain assets previously
classified within Vehicles, Plant, Furniture and Equipment have been reassessed as more appropriately recognised as either Council Dwellings or Other Land and
Buildings. Reflecting that the assets meet the definition of building components rather than stand-alone plant. The opening net balances of the 2024/25 values have
been restated to reflect this. 
Page 188 of 392

Page 189

60 
Annual Accounts 2025/26 PUBLIC
Note 10: Heritage Assets 
A valuation of the fair value of the Council’s Heritage
Assets was last carried out by an external valuer in
2021/22. In the five years prior to 2025/26, there were
no acquisitions, donations, or disposals of Heritage
Assets. The value at 31 March 2026 was £44.186m
(£44.186m at 31 March 2025). 
The combined collections managed by the
Renfrewshire Arts and Museums Service number in
excess of 350,000 objects and it is impractical to
undertake a full valuation of all the items in the
collection. The balances above reflect the valuation
of materials examined by the external valuer during
2021/22. Further detail on the valuation of each
category of asset is outlined in Accounting Policy K on
page 88. 
The details of the valuations of the assets are as
follows:
• Archaeology items
• Natural history and science book collections
• Art collection
• Ceramics
• Natural history and Numismatics
• Science and social history collections
• Special collections
• Textiles
• Transport collection
• World cultures
Note 11: Assets held for sale 
The following table summarises the movement in the
fair value of assets held for sale during the year:
2024/25 2025/26
£m £m
0.100 Opening balance at 1 April 2.492
Assets reclassified as held for sale:
2.492 Other Land and Buildings 0.000
(0.100) Assets sold (2.492)
2.492 Closing balance at 31 March 0.000
Assets Held for Sale
Note 12: Intangible assets 
The Council accounts for purchased software
licences as intangible assets. The cost of the licences
is amortised on a straight-line basis over the
expected life of the licences, which is three to five
years for all ICT systems. Amortisation charges are
initially charged to ICT services and then absorbed as
an overhead across all the service headings in the net
expenditure of services.  
The movement on intangible asset balances during
the year is shown in the following table.
2024/25 2025/26
£m £m
Balance at 1 April
5.927 Gross carrying amount 6.060
(4.203) Accumulated amortisation (4.871)
1.724 Net carrying amount at 1 April 1.189
0.313 Additions: purchases 0.384
(0.180) Disposals 0.000
0.180 Disposal amortisation 0.000
(0.848) Amortisation for the year (0.883)
1.189 Net carrying amount at 31
March 0.690
Comprising:
6.060 Gross carrying amount 6.444
(4.871) Accumulated amortisation (5.754)
1.189 Balance at 31 March 0.690
Purchased Software Licences
There are no individual intangible assets that are
material to the financial statements.
Page 189 of 392

Page 190

61 
Annual Accounts 2025/26 PUBLIC
Note 13: Capital expenditure and
capital financing 
Capital expenditure involves the creation of assets,
the benefit of which will be available to future Council
Tax and non-domestic rate payers. It is financed from
borrowing and capital income (sales receipts), and so
the cost of the asset is effectively borne over a
number of years. 
The Council’s overall capital investment programme
is sub-divided into two programmes: housing and
non-housing. In 2025/26 total spending on capital
projects was £156.012m (£120.105m in 2024/25) and
was within the overall prudential limits approved by
Council. Capital receipts of £5.043m (£4.013m) were
used to fund spending on capital projects.
The net capital expenditure for the year of £62.842m
(£67.768m in 2024/25) was financed from external
borrowing, credit arrangements and from cash
balances. The table below shows the total amount of
capital expenditure incurred in the year, including the
value of assets acquired under lease and service
concession arrangements. 
Also shown are the resources that have been used to
finance this capital expenditure. Where capital
expenditure is to be financed in future years by
charges to revenue as assets are used by the
Council, the expenditure results in an increase in the
Capital Finance Requirement (CFR), a measure of the
capital expenditure incurred historically by the
Council that has yet to be financed. The movement in
the CFR during the year is also analysed in the table
below.   
As at 31
March 2025
As at 31
March 2026
£m £m
510.099 Opening Capital Financing Requirement 599.561
Capital investment:
119.440 Property, plant and equipment 155.105
0.313 Intangible assets 0.384
0.352 Revenue expenditure funded from capital under statute 0.523
20.795 Recognition of Right of Use Assets and increase in PPP Liability 0.000
Sources of finance:
(4.013) Capital receipts – sale of council assets (5.043)
(27.192) Government grants and other contributions (55.011)
(21.132) Sums set aside from revenue – direct revenue contributions (33.116)
(14.404) Loans Fund/Finance Lease principal repayments (13.566)
15.303 Adjustment for Service Concession Arrangements 2.047
599.561 Closing Capital Financing Requirement 650.884
Explanation of movements in year:
58.971 Increase/(decrease) in underlying need to borrow (unsupported by government
financial assistance)
53.098
3.529 Increase/(decrease) in Right of Use Asset Creditor (0.400)
26.962 Increase/(decrease) in PPP finance lease creditor (1.375)
89.462 Increase/(Decrease) in Capital Financing Requirement 51.323 
At 31 March 2026 the Council had commitments on
capital contracts for non-housing projects of
£72.361m (£65.412m in 2024/25) and for housing
projects of £87.040m (£11.534m in 2024/25). This
expenditure will be funded from a combination of
government grants, external borrowing, income from
selling assets and contributions from revenue
budgets.
Page 190 of 392

Page 191

62 
Annual Accounts 2025/26 PUBLIC
Note 14: Service Concession
Arrangements 
The Council entered into a Public Private Partnership
on 1 July 2006 for the provision and maintenance of
educational buildings and other facilities. This
agreement provides the Council with replacement
buildings such as primary and secondary schools and
community education premises. The provider is
required to ensure the availability of these buildings
to a pre-agreed standard, with deductions from the
fee payable being made if facilities are unavailable or
performance is below the minimum standard. 
When the agreement ends in 2038, the buildings will
be handed to the Council at nil consideration with a
guarantee of no major maintenance requirements for
a five-year period. The Council only has rights to
terminate the contract if it compensates the
contractor in full for costs incurred and future profits
that would have been generated over the course of
the remainder of the contract. The assets used to
provide services are recognised on the Council’s
Balance Sheet. Movements in their value over the
year are shown in the movement on the Property,
Plant and Equipment balance in Note 9. 
The Council makes an agreed payment each year
which is increased by inflation and can be reduced if
the contractor fails to meet availability and
performance standards. Under the agreement the
Council is committed to paying the following sums
(assuming an average inflation rate of 2.5% per
annum and excluding any performance/availability
deductions). The discount rate used in this
calculation is the interest rate implicit in the PFI
agreement, which was fixed at the outset at 7.6%. 
Future Repayment Periods - Schools
Service
Charges
Liability
Repayment
Interest
Repayment Total
£m £m £m £m
Payable within 1 year 12.168 4.468 5.074 21.710
Payable within 2-5 years 55.285 20.964 16.653 92.902
Payable within 6-10 years 88.492 31.681 10.879 131.052
Payable within 11-15 years 36.739 11.651 0.997 49.387
Total 192.684 68.764 33.603 295.051 
In 2019/20, the Council entered into a Service Concession Agreement for the use of a waste materials recovery
facility at Bargeddie.  Residual waste is then processed at a thermal treatment plant in Dunbar.  North Lanarkshire
Council is the lead authority and is contracted to Viridor. Five councils, including Renfrewshire, have an inter-
authority agreement with North Lanarkshire Council. Renfrewshire Council’s share of the contract is 20%.   
The discount rate used in this calculation is the interest rate implicit in the agreement, which was fixed at the
outset at 5.68%.
Future Repayment Periods - Waste
Facility
Service
Charges
Liability
Repayment
Interest
Repayment Total
£m £m £m £m
Payable within 1 year 4.587 0.152 0.300 5.039
Payable within 2-5 years 25.066 0.862 1.105 27.033
Payable within 6-10 years 28.222 0.257 1.257 29.736
Payable within 11-15 years 30.896 1.757 0.959 33.612
Payable within 16-20 years 24.953 2.245 0.312 27.510
113.724 5.273 3.933 122.930Total 
Page 191 of 392

Page 192

63 
Annual Accounts 2025/26 PUBLIC
Outstanding Service Concession Arrangements Schools Waste Facility Total
£m £m £m
Balance at 1 April 2024 (60.235) (4.701) (64.936)
Increase in liability to recognise net present value of
contingent rents
(16.285) (0.580) (16.865)
Payments during the year 4.492 (0.100) 4.392
Balance at 31 March 2025 (72.028) (5.381) (77.409)
Increase in liability to recognise net present value of
contingent rents
(1.081) (0.020) (1.101)
Payments during the year 4.345 0.127 4.472
Balance at 31 March 2026 (68.764) (5.274) (74.038) 
In accordance with Accounting Policy and in line with Finance Circular 10/2022, the Council applied the permitted
PPP Service Concession Arrangement flexibility in financial year 2022/23 on a retrospective annuity basis with a
useful life of 40 years. The flexibility being applied is consistent with the current Loans Fund arrangements and is
considered prudent, sustainable and affordable over the life of the asset.  
The current annuity charges based on the estimated useful life for the schools service concession arrangement
have been compared against the liability repayment profile based on the estimated useful asset lives for the
schools service 
The most appropriate asset life was considered to be 40 years which replicated the useful life of other similar type
assets on the council’s balance sheet i.e. schools. The calculation of the repayment charges for the service
concession arrangement using asset life annuity is compared to the current charges which are made over the
contract period.
In addition to the one-off retrospective element, an in-year saving occurred in the scheduled debt repayments in
2025/26 of 2.047m (£1.406m in 2024/25). This will be followed by a reduction in the annual charges for a further 12
years and then the continuation of statutory charges after the contract arrangements have been repaid. Over the
full asset life of the service concession arrangement, the total debt liability remains the same. 
With effect from 1 April 2024, IFRS 16 Leases also applied to service concession arrangements. Under IFRS 16,
where indexation affects future service concession payments, the lease liability requires to be remeasured.
Instead of expensing the increased payment, the net present value of future payments that comprise the liability is
recalculated based on revised level of payments. The effect of this has been to increase balance sheet assets by
£1.101m (2024/25 £16.865m), with an equal increase in lease liabilities as at 31 March 2026.
Prior  Repayment Current Repayment (Cost)/Reduction
£m £m £m
Pre 2025/26 66.860 22.358 44.502
Paid in 2025/26 4.345 2.298 2.047
Payable within 1 year 4.468 2.503 1.965
Payable within 2-5 years 20.964 12.309 8.655
Payable within 6-10 years 31.681 21.207 10.474
Payable within 11-15 years 11.651 30.424 (18.773)
Payable within 16-20 years 0.000 43.538 (43.538)
Payable within 21-25 years 0.000 5.332 (5.332)
Total 139.969 139.969 0.000
PPP Service Concession
Liability Repayment
Page 192 of 392

Page 193

64 
Annual Accounts 2025/26 PUBLIC
Note 15: Leases 
Renfrewshire Council as Lessee 
Right of Use Assets
The Council adopted IFRS 16 leases from 1 April
2024, as per the Code of Practice for Local Authority
Accounting. The main impact of the new
requirements is that for arrangements previously
accounted for as operating leases, a right of use
asset and a lease liability have been brought into the
balance sheet at 1 April 2024. Leases for items of low
value and leases that expire on or before 31 March
2025 are exempt from the new arrangements. 
The Council has 17 properties classed as a right of
use asset with a liability. As at 31 March 2026,
outstanding obligations to make payments are as
follows: 
As at 31
March
2025
As at 31
March
2026
£m £m
0.413 Not later than one year 0.349
1.220 Between one and five years 1.208
1.457 Between six and ten years 1.171
0.376 Later than ten years 0.338
3.466 3.066 
Renfrewshire Council as Lessor 
Operating Leases
The Council leases out property and equipment
under operating leases for the following purposes:
• for the provision of community services, such as
sports facilities, tourism services and community
centres
• for economic development purposes to provide
suitable affordable accommodation for local
businesses.
The future minimum lease payments receivable
under non-cancellable leases in future years are: 
As at 31
March
2025
As at 31
March
2026
£m         £m
0.235 Not later than one year 0.281
0.494 Between one and five years 0.658
1.355 Later than five years 1.524
2.084 2.463 
The minimum lease payments receivable does not
include rents that are contingent on events taking
place after the lease was entered into, such as
adjustments following rent reviews.
Note 16: Inventories 
2024/25 2025/26
£m £m
1.287 Balance at 1 April 1.060
9.670 Additions during the year 9.787
(9.893) Recognised as an expense during the year: inventories sold, exchanged or distributed (9.677)
(0.004) Recognised as an expense during the year: inventories written down (0.005)
1.060 Balance at 31 March 1.165
Inventories
Page 193 of 392

Page 194

65 
Annual Accounts 2025/26 PUBLIC
Note 17: Cash and cash equivalents 
The balance of cash and cash equivalents is made up of the following components. With the exception of imprest
accounts held at Council establishments, the balances in all of the categories listed below are used together to
manage the Council’s overall cash balances on a day-to-day basis. 
2024/25 Cash and cash equivalents 2025/26
£m         £m
(13.479) Current account balances with the council's banker (3.139)
0.516 Euro account balances with the council's banker - sterling equivalent 0.550
5.301 Callable deposits with UK banks and building societies 8.024
13.127 Callable deposits in money market funds and ultra-short bond funds 35.327
0.040 Imprest accounts held at council establishments 0.038
5.505 Total cash and cash equivalents 40.800 
Note 18: Debtors 
Amounts due to be received by the Council at 31 March are set out below. This is analysed by type of debtor to
provide greater transparency of the sums due.
Short-term Long-term Short-term Long-term
£m £m £m £m
23.728 0.000 Central government bodies (non-NHS) 36.109 0.000
5.037 0.900 Central government bodies (NHS) 9.128 0.810
1.535 0.000 Other local authorities 2.269 0.000
8.281 0.000 HM Revenue and Customs 7.559 0.000
0.064 0.029 Employees 0.001 0.026
21.889 0.000 Council Tax arrears 23.634 0.000
(14.397) 0.000 less impairment (15.738) 0.000
4.376 0.000 Rent arrears 5.029 0.000
(3.240) 0.000 less impairment (4.031) 0.000
35.814 6.045 Other entities and individuals 25.481 5.953
(20.607) (4.972) less impairment (14.337) (4.969)
62.480 2.002 Total Debtors 75.104 1.820
31 March 2025 As at 31 March 2026
Page 194 of 392

Page 195

66 
Annual Accounts 2025/26 PUBLIC
Note 19: Creditors 
Amounts due to be paid by the Council as at 31 March are set out below. This is analysed by type of creditor to
provide greater transparency of the sums due. 
Short-term Long-term Short-term Long-term
£m £m £m £m
(5.485) (0.549) Central government bodies (non-NHS) (31.704) (0.517)
(1.894) 0.000 Central government bodies (NHS) (0.264) 0.000
(2.506) 0.000 Other local authorities (2.042) 0.000
0.000 0.000 Public corporations and trading funds (0.007) 0.000
(7.895) 0.000 HM Revenue and Customs (8.857) 0.000
(5.368) 0.000 Strathclyde Pension Fund and
Scottish Public Pensions Agency
(5.478) 0.000
(14.069) 0.000 Employees (14.644) 0.000
(4.345) (67.683) Service concession arrangements: schools (4.468) (64.296)
(0.017) (5.364) Service concession arrangements: waste
facility
(0.152) (5.121)
(0.413) (3.053) Right of Use Assets (0.349) (2.717)
(3.488) 0.000 Council Tax refundable to taxpayers (3.438) 0.000
(1.656) 0.000 Council Tax receipts in advance (1.320) 0.000
(23.203) (0.932) Other entities and individuals (40.111) (0.900)
(70.339) (77.581) Total Creditors (112.834) (73.551)
As at 31 March 2025 As at 31 March 2026
Note 20: Provisions 
Provisions are made where an event has taken place that gives the Council a legal or constructive obligation that
probably requires settlement by a transfer of economic benefits or service potential, and a reliable estimate can be
made of the amount of the obligation. Teacher’s maternity pay is a short-term provision, made to reflect the
changes in European legislation that allow teachers to accrue all holidays during parental leave.  
The movement in these short-term provisions is detailed below: 
Short-term Provisions
Teachers’
maternity pay
Other Total
£m £m £m
As at 1 April 2025 (0.142) (0.264) (0.406)
Additional provisions made during the year (0.146) (0.421) (0.567)
Amounts used during the year 0.142 0.264 0.406
As at 31 March 2026 (0.146) (0.421) (0.567) 
A summary of the movements in the long-term provisions made by the Council is detailed below, along with an
explanation of the reason for the provision: 
Page 195 of 392

Page 196

67 
Annual Accounts 2025/26 PUBLIC
Long-term Provisions
Holiday pay
compensation
Insurance
claims
Total
£m £m £m
Balance at 1 April 2025 (0.445) (4.785) (5.230)
Additional provisions made during the year 0.000 (1.951) (1.951)
Amounts used during the year 0.000 0.395 0.395
As at 31 March 2026 (0.445) (6.341) (6.786) 
Holiday pay compensation payments 
The Council has received a number of claims arising from a European Court of Justice ruling in relation to holiday
pay. A provision has been made to reflect the potential outcome of known claims. 
Insurance claims 
The provision for insurance claims represents the actuarial assessment of excess costs arising from insurance
claims together with identified liabilities in respect of insurance claims outstanding against Renfrewshire Council
and predecessor local authorities. The Council has increased its net assessment by £1.951m on the basis of
information held by the Council and notified by Glasgow City Council, the coordinating authority for the former
Strathclyde Regional Council. 
Note 21: Financial Instruments 
Categories of financial instruments 
A financial instrument is any contract that gives rise to a financial asset of one entity and a financial liability or
equity instrument of another entity. 
The term ‘financial instrument’ covers both financial assets and financial liabilities and includes trade payables,
borrowings (for example Public Works Loan Board debt and market debt), financial guarantees, bank overdraft,
trade receivables, loans receivable, cash deposits with financial institutions (some on a fixed term basis and some
which are immediately available) and longer-term investments. The following categories of financial instrument are
carried in the balance sheet. 
Loans to other entities and individuals comprise a loan to Kilbarchan Amateur Athletic Club of £0.071m (2024/25
£0.073), home loans of £0.201m (2024/25 £0.213m) and social care charging order debtors of £0.653m (2024/25
£0.737m). Note that these balances are not principal amounts owed, rather valued at amortised cost based on a
notional (effective) interest rate. 
Page 196 of 392

Page 197

68 
Annual Accounts 2025/26 PUBLIC
Long-term Current Long-term Current
£m £m £m £m
(232.050) (5.000) (294.432) (0.002)
0.000 (2.694) 0.000 (3.110)
(232.050) (7.694) (294.432) (3.112)
0.000 (46.766) (20.000) (26.766)
0.000 (0.858) 0.000 (0.857)
0.000 (0.588) (0.324) (0.251)
0.000 (48.212) (20.324) (27.874)
0.000 (33.839) 0.000 (40.095)
(232.050) (89.745) (314.756) (71.081)
0.000 (33.091) 0.000 (74.297)
(76.100) (4.775) (72.136) (4.968)
(0.395) 0.000 (0.260) 0.000
(76.495) (37.866) (72.396) (79.265)
As at 31 March 2025 As at 31 March 2026
Financial Liabilities
Total Public Works Loan Board (PWLB) borrowing
Borrowing from group entities
Total Borrowing
Financial Liabilities included in Creditors
Principal sum borrowed
Accrued interest
Principal sum borrowed
Accrued interest
EIR adjustments
Total non-PWLB borrowing (“market debt”)
At amortised cost trade payables
Service Concession and Right of Use Asset liabilities
Financial guarantees
Long-term Current Long-term Current
£m £m £m £m
0.000 17.521 0.000 24.589
0.000 0.017 0.000 0.039
0.000 (0.004) 0.000 (0.005)
4.391 0.000 4.707 0.000
4.391 17.534 4.707 24.623
0.000 (8.165) 0.000 4.903
0.000 0.029 0.000 0.025
0.000 (0.003) 0.000 (0.003)
0.000 13.644 0.000 35.876
0.000 5.505 0.000 40.801
5.959 70.444 5.873 77.977
4.826 0.044 0.916 0.041
(4.972) (23.847) (4.969) (18.369)
5.813 46.641 1.820 59.649
As at 31 March 2025
Financial Assets
At amortised cost:
Principal
Accrued interest
As at 31 March 2026
Loss allowance
At fair value through other comprehensive income - designated
equity instruments
At fair value through profit or loss
Principal
Accrued interest
Loss allowance
Total Investments
Total Cash and cash equivalents
At amortised cost:
At amortised cost:
Trade receivables
Loans made for service purposes
Loss allowance
Financial Assets included in Debtors
Page 197 of 392

Page 198

69 
Annual Accounts 2025/26 PUBLIC
Equity instruments elected to fair value
through other comprehensive income
The Council has elected to account for the Insurance
Fund at fair value through other comprehensive
income because it is a long-term strategic holding
and changes in its fair value is not considered to be
part of the Council’s annual financial performance.
The Insurance Fund is invested in the Phoenix Fund,
managed on behalf of the Council by LGT Wealth
Management.  
The objective of the fund is to achieve long term
growth with low volatility, through a widely diversified
portfolio. The fair value of the investment is £4.707m
at 31 March 2026 (£4.391m as at 31 March 2025).
Income from the Fund is reinvested.
Fair value of financial instruments
Financial instruments, except those classified at
amortised cost, are carried in the Balance Sheet at
fair value. For most assets, including money market
funds, the fair value is taken from the market price.
The fair values of other instruments have been
estimated by calculating the net present value of the
remaining contractual cash flows at 31 March 2026. 
The Council’s ‘Fair value through other
comprehensive income’ assets comprise its
insurance fund investments. The fair value of the
insurance fund investments equates to the market
value of those investments, and this valuation has
been provided by the Council’s investment manager,
LGT Wealth Management.
Financial instruments classified at amortised cost
are carried in the Balance Sheet at amortised cost. 
Their fair values have been estimated by calculating
the net present value of the remaining contractual
cash flows at 31 March 2026, using the following
methods and assumptions:
• Loans borrowed by the Council have been valued
by discounting the contractual cash flows over the
whole life of the instrument at the appropriate
market rate for local authority loans.
• For ‘lender option borrower option’ (LOBO) loans,
PWLB premature repayment rates have been
applied to provide the fair value under PWLB debt
redemption procedures. The PWLB redemption
rates provide a reasonable proxy for rates and a
number of market participants have used this
basis when considering early redemption costs for
market loans. It is likely that lenders will only
exercise their options when market rates have
risen above the contractual loan rate. The interest
rate risk associated with the Council’s LOBOs is
not deemed to be significant and the potential
penalties charged may make the redemption of
the loans an uneconomic option. 
• The fair values of other long-term loans and
investments have been discounted at the market
rates for similar instruments with similar
remaining terms to maturity on 31 March.
• The fair values of financial guarantees have been
estimated based on the likelihood of the
guarantees being called and the likely payments to
be made.
• No early repayment or impairment is recognised
for any financial instrument.
• The fair value of short-term instruments, including
trade payables and receivables, is assumed to
approximate to the carrying amount given the low
and stable interest rate environment.
Fair values are shown in the table below, split by their
level in the fair value hierarchy:
• Level 1 – fair value is only derived from quoted
prices in active markets for identical assets or
liabilities, e.g. bond prices
• Level 2 – fair value is calculated from inputs other
than quoted prices that are observable for the
asset or liability, e.g. interest rates or yields for
similar instruments
• Level 3 – fair value is determined using
unobservable inputs, e.g. non-market data such
as cash flow forecasts or estimated
creditworthiness.
Page 198 of 392

Page 199

70 
Annual Accounts 2025/26 PUBLIC
The fair value for each category of financial instrument is shown below, with the balance sheet carrying amount
shown for comparison. 
Carrying
Amount
Fair value Financial Liabilities Carrying
Amount
Fair value
£m £m £m £m
Financial liabilities measured at amortised cost:
(239.743) (189.683) Public Works Loan Board borrowing 2 (297.547) (238.477)
(48.211) (53.523) Non-PWLB borrowing (“market debt”) 2 (48.198) (53.858)
Other liabilities:
(80.875) (80.875) Service Concession and Finance Lease liabilities 3 (77.103) (77.103)
(0.395) (0.395) Financial guarantees 3 (0.260) (0.260)
(369.224) (324.476) (423.108) (369.698)
Financial liabilities measured at amortised cost:
(33.839) n/a Borrowing from group entities (40.618) n/a
(33.091) n/a Trade payables: short-term (74.297) n/a
(66.930) (114.915)
As at 31 March 2025 As at 31 March 2026
Fair
value
level
Total financial liabilities for which fair value is disclosed
Total financial liabilities for which fair value is not disclosed 
Carrying
Amount
Fair value Financial Assets Carrying
Amount
Fair value
£m £m £m £m
13.128 13.128 Callable deposits in money market funds and
ultra-short bond funds
1 35.326 35.326
0.516 0.516 Euro current account balances with the council’s banker 2 0.550 0.550
4.391 4.391 Investments in pooled funds (insurance fund) 1 4.707 4.707
18.035 18.035 40.583 40.583
17.534 17.534 Fixed term deposits with UK building societies 2 24.623 24.623
(8.178) (8.178)
Callable deposits with UK banks and building societies
(including sterling current account balances with the
Council’s banker)
2 4.885 4.885
0.040 0.040 Imprest accounts held at council establishments 2 0.040 0.040
1.023 1.037 Loans made for service purposes 3 0.925 0.945
10.419 10.433 30.473 30.493
28.454 28.468 71.056 71.076
Financial assets measured at amortised cost:
1.020 n/a Trade receivables and prepayments: long-term 0.934 n/a
46.598 n/a Receivables and prepayments: short-term 59.610 n/a
47.618 60.544
As at 31 March 2025 As at 31 March 2026
Total financial assets for which fair value is disclosed
Total financial assets for which fair value is not disclosed
Fair
value
level
Total Financial assets measured at fair value
Total Financial assets measured at amortised cost
Items of income, expense, gain and loss relating to financial instruments
The following items of income, expense, gain and loss relating to financial instruments are included within the lines
‘Financing and investment income and expenditure’ and ‘(Surplus)/Deficit from investments in equity instruments
designated as Fair Value through Other Comprehensive Income’ in the CIES.
Page 199 of 392

Page 200

71 
Annual Accounts 2025/26 PUBLIC
2024/25
Amortised
cost
Elected to Fair
Value through
Other
Comprehensive
Income
Fair Value
through
Profit or
Loss 2025/26
£m £m £m £m £m £m
17.118 Interest expense 0.000 0.000 0.000 16.517 16.517
2.472 Impairment losses 1.602 0.000 0.000 0.000 1.602
0.007 Fee expense 0.000 0.000 0.000 0.022 0.022
19.597 Total expense in the Surplus /
Deficit on the Provision of Services 1.602 0.000 0.000 16.539 18.141
(5.736) Interest income (1.677) 0.000 (1.105) 0.000 (2.782)
(0.128) Dividend income 0.000 (0.136) 0.000 0.000 (0.136)
(5.864) Total income in the Surplus/Deficit
on the Provision of Services (1.677) (0.136) (1.105) 0.000 (2.918)
0.068 Net (gain) or loss on revaluation 0.000 (0.180) (0.023) 0.000 (0.203)
0.068 (Surplus)/Deficit on the revaluation
of financial assets 0.000 (0.180) (0.023) 0.000 (0.203)
13.801 Net (Gain)/Loss for the year (0.075) (0.316) (1.128) 16.539 15.020
Financial Assets
Financial
liabilities
at
amortised
cost
Note 22: Nature and extent of risks
arising from Financial Instruments 
The Council’s management of treasury risks actively
works to minimise the Council’s exposure to the
unpredictability of financial markets and to protect
the financial resources available to fund services. The
Council complies with CIPFA’s Code of Treasury
Management Practices and has written principles for
overall risk management as well as written policies
and procedures covering specific areas such as
credit risk, liquidity risk and market risk. 
In line with the Treasury Management Code, the
Council approves a Treasury Management Strategy
before the commencement of each financial year.
The Strategy sets out the parameters for the
management of risks associated with financial
instruments. The Council also produces Treasury
Management Practices specifying the practical
arrangements to be followed to manage these risks. 
The Treasury Management Strategy includes an
Investment Strategy in compliance with Scottish
Government guidance on Local Government
Investments.  This Guidance emphasises that priority
is to be given to security and liquidity, rather than
yield.   
The Council’s Treasury Management Strategy and its
Treasury Management Practices seek to achieve a
suitable balance between risk and return or cost. 
Credit Risk 
Credit risk arises from the short-term lending of
surplus funds to financial institutions and local
authorities, as well as credit exposures to the
Council’s customers. It is the policy of the Council to
place deposits only with other local authorities and a
limited number of high-quality banks, building
societies and money market funds whose credit
rating is independently assessed as sufficiently
secure by the Council’s treasury advisers and to
restrict lending to a prudent maximum amount for
each entity. 
Page 200 of 392

Page 201

72 
Annual Accounts 2025/26 PUBLIC
The Treasury Management Strategy outlines the limits
placed on investments with any counterparty.
The table below summarises the credit risk
exposures of the Council’s treasury investment
portfolio (including accrued interest) by credit rating.   
2024/25 2025/26
£m £m
13.071 AAA (money market funds and 
ultra-short bond funds)
35.226
2.465 A+ 3.431
2.810 A 4.571
17.521 UK Debt Management Office 24.589
35.867 Total 67.817
Total Investment Portfolio by
Credit Rating
The Council does not generally allow credit for
customers such that, at 31 March 2026, £10.540m of
sundry income debt is past its due date for payment
(£9.111m as at 31 March 2025). The past due amount
can be analysed by age as follows: 
2024/25 2025/26
£m £m
1.549 Less than three months 1.971
1.864 Three to six months 1.310
0.666 Six months to one year 1.211
5.032 More than one year 5.476
9.111 Total 9.968
Sundry Income Debt Past Due
Loss allowances on trade receivables have been
calculated by reference to the Council’s historic
experience of default, adjusted for current and
forecast economic conditions. Receivables are
determined to have suffered a significant increase in
credit risk where they are 30 or more days past due
and they are determined to be credit-impaired where
they are 90 or more days past due.  Receivables are
written off to the Surplus or Deficit on the Provision of
Services when there is no reasonable prospect of
payment, or when they become prescribed; but steps
are still taken to collect sums owing when
information becomes available which suggests the
debtor can make payment. 
Collateral 
Renfrewshire Council occasionally provides loans to
residents who wish to buy their homes under Right to
Buy legislation. In such cases the Council takes a
standard security over the property. As at 31 March
2026 the outstanding value of home loans advanced
by the Council was £0.201m (£0.213m as at 31 March
2025). 
Liquidity risk 
The Council’s main source of borrowing is
HM Treasury’s Public Works Loan Board, but the
Council also has loans classed as ‘lender option
borrower option’ (LOBO). There is no significant risk
that the Council will be unable to raise finance to
meets its commitments under financial instruments. 
The Council has safeguards in place to ensure that a
significant proportion of its borrowing does not
mature for repayment at any one time in the future to
reduce the financial impact of re-borrowing at a time
of unfavourable interest rates. 
The Council’s policy is to ensure that no more than
15% of loans are due to mature within any financial
year and 50% within any rolling five-year period
through a combination of prudent planning of new
loans taken out and, where it is economic to do so,
making early repayments. 
Page 201 of 392

Page 202

73 
Annual Accounts 2025/26 PUBLIC
The maturity analysis of the principal element of borrowing is as follows: 
£m % £m %
5.000 1.76% Less than one year 0.002 0.00%
0.007 0.00% Between one and two years 15.000 4.40%
0.000 0.00% Between two and five years 49.000 14.36%
278.809 98.24% More than five years 277.198 81.24%
283.816 100.00% Total 341.200 100.00%
As at 31 March 2025 Principal Borrowing Maturity Analysis As at 31 March 2026
Market risk: interest rate risk 
Changes in market interest rates influence the
interest payable on borrowings and on interest
receivable on surplus funds invested. For example, a
rise in interest rates would mean an increase in the
interest charged on borrowing at variable rates and
an increased cost to the taxpayer. An increase in
interest rates would also mean an increase in the
income received on lending at variable rates and a
reduction in cost for the taxpayer. Changes in market
rates also affect the notional ‘fair value’ of lending
and borrowing. For example, a rise in interest rates
would reduce the fair value of both lending and
borrowing at fixed rates. Changes in the fair value of
lending and borrowing do not impact upon the
taxpayer and are confined to prescribed
presentational aspects in the Accounts.
The Council has a variety of strategies for managing
the uncertainty of future interest rates and the
financial impact on the Council’s finances:
• it is the policy of the Council to limit its exposure
to variable rate borrowing to a maximum of 25% of
what it borrows;
• during periods of falling rates and where it is
economically advantageous to do so, the Council
will consider the repayment and restructuring of
fixed interest rate debt;
• the Council takes daily advice from its specialist
treasury advisers and actively monitors changes in
interest rates to inform decisions on the lending of
surplus funds, new borrowings and restructurings
of existing borrowings.
To illustrate the notional impact of changes in
interest rates upon the Council, the following table
shows the financial effect if rates had been 1% higher
during 2025/26, with all other variables held
constant.
Decrease in the fair value of fixed rate loans and deposits
Decrease in the fair value of fixed rate borrowing
0.130
(0.684)
(0.554)
(0.182)
0.008
31.214
Increase in interest payable on new fixed rate borrowings taken during the year
Increase in interest receivable on deposits placed during the year
Notional impact on the Surplus/Deficit on the Provision of Services
Share of this impact which would be attributable to the Housing Revenue Account
Other changes that would have no impact on the Surplus/Deficit on the Provision of
Services or Other Comprehensive Income and Expenditure:
As at 31 March 2026
£m
Interest rate risk
The impact of a 1% fall in interest rates would be as above but with the changes being reversed. 
Page 202 of 392

Page 203

74 
Annual Accounts 2025/26 PUBLIC
Market risk: price risk
The Council’s Insurance Fund is invested in an
externally managed fund under the powers of
schedule 3 of the Local Government (Scotland) Act
1975 and section 3 of the Local Government etc.
(Scotland) Act 1994. The investments are managed
on behalf of the Council by LGT Wealth Management
in the Phoenix Fund. The objective of the fund is to
achieve long-term growth with low volatility, through
a widely diversified portfolio. The benchmark return is
SONIA+2% per annum. During 2025/26 the book cost
of investments increased by £0.136m (£0.135m
increase during 2024/25). The investment is classified
as fair value through other comprehensive income,
meaning that all movements in price will impact on
the gains and losses recognised in other
comprehensive income and expenditure. This is an
accounting requirement that has no impact on the
taxpayer. To illustrate the impact of changes in share
price upon the Council, an increase or fall of 5% in
the general price of shares at 31 March 2026 would
have resulted in a £0.086m gain or loss being
recognised in Other Comprehensive Income and
Expenditure for 2025/26.
Market risk: foreign exchange risk
As at 31 March 2026 the Council had a foreign
currency deposit of €0.629m with the Council’s
banker (€0.617m as at 31 March 2025). This sum was
being held in order to mitigate the foreign exchange
risk associated with a contract being entered into as
part of the Glasgow and Clyde Valley City Deal
programme. The sterling valuation of this deposit as
at 31 March 2026, based on the euro to sterling
exchange rate at that time, was £0.550m. To illustrate
the impact of changes in foreign exchange rates upon
the Council, a relative increase or decrease of 1% in
the euro to sterling exchange rate at 31 March 2026
would have resulted in a £0.005m gain or loss being
recognised in Other Comprehensive Income and
Expenditure for 2025/26. 
Note 23: External audit costs 
2024/25 2025/26
£m £m
0.487 Fees payable with regard to external audit services carried out by the appointed
auditor for the year
0.500
0.487 Total 0.500
Audit Fees
Note 24: Agency services 
The Council bills and collects non-domestic rates on behalf of the Scottish Government from ratepayers situated
within Renfrewshire Council and East Renfrewshire Council. The Council also bills and collects, along with its own
Council Tax, domestic water and sewerage charges on behalf of Scottish Water.
2024/25 2025/26
£m £m
107.505 Scottish Government - Contributions (to)/from the non-domestic rates pool 108.844
15.951 Non-domestic rates collected: East Renfrewshire 16.102
0.073 Service income from East Renfrewshire Council for collection of non-domestic rates 0.075
(16.024) Cost of collection of Non-domestic rates from East Renfrewshire (16.177)
38.164 Domestic water and sewerage charges collected 41.970
(38.164) Domestic water and sewerage charges paid over to Scottish Water (41.970)
0.730 Service income from Scottish Water for collection of domestic water and sewerage
charges
0.741
Agency Services
Page 203 of 392

Page 204

75 
Annual Accounts 2025/26 PUBLIC
Note 25: Related parties 
The Council’s related parties are those bodies or
individuals that have the potential to control or
significantly influence the Council, or to be controlled
or significantly influenced by the Council, or where
those individuals or bodies and the Council are
subject to common control. The Council is required
to disclose material transactions that have occurred
with related parties and the amount of any material
sums due to or from related parties. 
Related party relationships require to be disclosed
where control exists, irrespective of whether there
have been transactions between the related parties.
Disclosure of this information allows readers to
assess the extent to which the Council might have
been constrained in its ability to operate
independently or might have secured the ability to
limit another party’s ability to bargain freely with the
Council. 
Senior Officers and Elected Members 
Members of the council and senior officers have
control over the Council’s financial and operating
policies. They have the responsibility to adhere to a
Code of Conduct, requiring them to declare an
interest in matters that directly or indirectly influence,
or appear to influence, their judgement or decisions
taken during the course of their work. The total of
councillors’ and senior officers’ remuneration
allowances paid in 2025/26 are shown in the
Remuneration Report on page 29.
Senior Officers
No senior officer holds a remunerated position
outside of their Council employment. For details of
Senior Officers’ interests, please check the register of
interests on the Council website at:
Register-of-senior-officers-interests
Senior Elected Members
Under the Council Code of Conduct, elected
members and senior officials must declare any
registered interests in any bodies where the Council
itself does not have significant influence over their
operations. Each member’s Register of Interest is
available at Councillors - Renfrewshire Website. 
In 2025/26, the Council made payments totalling
£9.921m (£6.581m 2024/25) to bodies where
members hold a position where they have significant
influence or control as listed below: 
2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26 2025/26
Expenditure
£m
Income
£m
Debtor  
£m
Creditor
£m
Expenditure
£m
Income
£m
Debtor 
£m
Creditor
£m
4.401 (0.108) 0.107 0.000 Quarriers - Charity Care
Organisation
4.651 0.087 0.019 (0.050)
0.599 (3.971) 0.480 0.140 NHS Greater Glasgow and
Clyde Health Board
2.312 (5.417) 1.137 (0.019)
0.000 0.000 0.000 0.000 Johnstone Sound Radio
Station
0.006 0.000 0.000 0.000
1.520 0.000 0.000 0.000 Kibble Trust 2.699 0.000 0.000 0.000
0.061 0.000 0.000 0.000 Erskine Arts - Charity n/a n/a n/a n/a
0.000 (0.006) 0.001 0.001 St Mirren Independent
Supporters Association*
0.235 (0.008) (0.001) 0.000
6.581 (4.085) 0.588 0.141 Total 9.903 (5.338) 1.155 (0.069)
NB: This disclosure excludes group entities and trade union membership.
*These figures relate to expenditure to and income from St Mirren Football Club and not the Supporters
Association
Page 204 of 392

Page 205

76 
Annual Accounts 2025/26 PUBLIC
Key Related Parties: subsidiaries and
associates
The organisations set out in the group accounts note
are those which the Council is considered to have
control or influence over. For further details of the
nature of group relationships, please refer to the
Group Accounts and Notes from page 104.
IAS 24 requires related party transactions during the
year to be disclosed. This disclosure should include
the nature of the transaction and any outstanding
balances. Significant transactions with other public
bodies are displayed below: 
2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26 2025/26
Expenditure
£m
Income
£m
Debtor  
£m
Creditor
£m
Expenditure
£m
Income
£m
Debtor 
£m
Creditor
£m
155.834 (49.083) 0.000 (24.186) Renfrewshire Health and
Social Care Integration Joint
Board
162.824 (48.633) 0.000 (28.480)
0.000 0.000 0.000 0.000 Advanced Manufacturing
Innovation District Scotland
(AMIDS)
0.139 0.000 0.000 (0.066)
155.834 (49.083) 0.000 (24.186) Total 162.963 (48.633) 0.000 (28.546)
Joint Ventures
2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26 2025/26
Expenditure
£m
Income
£m
Debtor  
£m
Creditor
£m
Expenditure
£m
Income
£m
Debtor 
£m
Creditor
£m
16.186 (0.631) 0.274 (1.487) Renfrewshire Leisure Ltd
trading as OneRen
15.762 (0.362) 1.320 (0.690)
0.352 0.000 0.000 0.000 Coats Observatory Trust 0.523 0.000 0.000 0.000
0.048 (0.056) 0.000 0.000 Paisley Museum
Reimagined Ltd
0.005 (0.037) 0.000 0.000
16.586 (0.687) 0.274 (1.487) Total 16.290 (0.399) 1.320 (0.690)
Subsidiary
2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26 2025/26
Expenditure
£m
Income
£m
Debtor  
£m
Creditor
£m
Expenditure
£m
Income
£m
Debtor 
£m
Creditor
£m
2.955 (0.165) 0.000 0.000 Strathclyde Partnership for
Transport
3.031 (0.550) 0.551 (0.007)
0.332 0.000 0.000 0.000 Strathclyde Concessionary
Travel Scheme Joint
Committee
0.341 0.000 0.000 0.000
1.643 (0.162) 0.000 (1.493) Renfrewshire Valuation Joint
Board
1.644 (0.110) 0.000 (1.530)
4.930 (0.327) 0.000 (1.493) Total 5.016 (0.660) 0.551 (1.537)
Associates
Page 205 of 392

Page 206

77 
Annual Accounts 2025/26 PUBLIC
Key Related Parties: Other Public Bodies 
Scottish Government 
The Scottish Government has effective control over the operations of the Council as it is responsible for providing
the statutory framework within which the Council operates, provides the majority of its funding in the form of grants
and prescribes the terms of many of the transactions that the Council has with other parties, such as Council Tax
and Non-Domestic Rates. Significant transactions with the Scottish Government are shown in the table below:
2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26 2025/26
Expenditure
£m
Income
£m
Debtor  
£m
Creditor
£m
Expenditure
£m
Income
£m
Debtor 
£m
Creditor
£m
0.000 (452.499) 0.202 0.000 Scottish Government 0.000 (484.436) 0.020 0.000
0.000 (452.499) 0.202 0.000 0.000 (484.436) 0.020 0.000 
Note 26: Pension schemes
accounted for as defined
contribution schemes 
Renfrewshire Council participates in the Scottish
Teachers' Superannuation Scheme. The scheme is an
unfunded statutory public service pension scheme
with benefits underwritten by the UK Government.
The scheme is financed by payments from employers
and from those current employees who are members
of the scheme and paying contributions at
progressively higher marginal rates based on
pensionable pay, as specified in the regulations. The
rate of employer contributions is set with reference to
a funding valuation undertaken by the scheme
actuary. The last four-yearly valuation was
undertaken as at 31 March 2024, which set the
contribution rate payable from 1 April 2024 to 31
March 2027. 
Renfrewshire Council has no liability for other
employers’ obligations to the multi-employer
scheme. As the scheme is unfunded there can be no
deficit or surplus to distribute on the wind-up of the
scheme or withdrawal from the scheme. 
The scheme is an unfunded multi-employer defined
benefit scheme. It is accepted that the scheme can
be treated for accounting purposes as a defined 
contribution scheme in circumstances where
Renfrewshire Council is unable to identify its share of
the underlying assets and liabilities of the scheme.
While the employee rate applied is variable, it will
provide an actuarial yield of 9.6% of pensionable pay.
At the last valuation a shortfall of £2.9bn was
identified in the notional fund, which will be repaid by
the increased rate of employers’ pension
contribution, effective from 1 April 2024, of 26%. 
Based on the proportion of employer contributions
paid in 2025/26, Renfrewshire Council’s level of
participation in the scheme is 2.9%. The Council paid
£26.142m (£24.806m in 2024/25) for employer's
contributions to the Scottish Public Pensions Agency.
£0.313m of expenditure (£0.375m in 2024/25) was
charged to service revenue accounts in respect of
“added years” pension enhancement termination
benefits, representing 0.3% of teachers’ pensionable
pay (0.4% in 2024/25). The estimated contribution for
2026/27 is £25.327m. 
Note 27: Defined benefit pension
schemes 
27a: Participation in pension schemes
The pension scheme for teachers (the Scottish
Teachers’ Superannuation Scheme) is explained in
the previous note, whilst this note relates exclusively
to the pension scheme for all other employees: the
Local Government Pension Scheme. 
Page 206 of 392

Page 207

78 
Annual Accounts 2025/26 PUBLIC
The Local Government Pension Scheme in Scotland
(LGPS) is a funded, defined benefit, statutory
occupational pension scheme. It is regulated by the
Scottish Public Pensions Agency but is administered
locally by fund administering authorities through
regional pension funds. For Renfrewshire Council,
the fund administering authority is Glasgow City
Council and the regional pension fund is the
Strathclyde Pension Fund. 
As a funded scheme, the Council and employees pay
contributions into the fund, calculated at a level
intended to balance the scheme’s pension liabilities
with the scheme’s investment assets. 
The statutory nature of the fund means that the post-
employment benefits are defined and set out in law. 
The Strathclyde Pension Fund is a multi-employer
fund, and it is possible for each employer to identify
its own share of the assets and liabilities of the fund
on a consistent and reasonable basis. 
The principal risks to the scheme are assumptions
relating to longevity, inflation, and investment
performance; in addition, statutory changes to the
scheme. These risks are mitigated to an extent by
statutory requirements limiting charges to the
Council’s general fund. The Council has additional
liabilities for unfunded discretionary pension
payments outside the main schemes such as
arrangements for the award of discretionary post-
employment benefits upon early retirement. This is
an unfunded defined benefit arrangement, under
which liabilities are recognised when awards are
made. 
However, there are no investment assets built up to
meet these pensions liabilities, and cash has to be
generated to meet actual pensions payments as they
eventually fall due. 
27b: Transactions relating to post-
employment benefits
The Council accounts for post-employment benefits
in the CIES as the benefits are earned by employees
accruing years of service, updating the liabilities
recognised to reflect inflation, changing assumptions
and accounting for investment returns on any
resources set aside to meet the costs. However, the
charge according to statutory regulations that is
required to be made against the General Fund
Balance and the Housing Revenue Account Balance
is based upon the employer contributions payable by
the Council to the pension fund in the year. 
This requires an adjustment to be made in the
movement in reserves statement to remove the cost
(according to generally accepted accounting
practices) of post-employment benefits and replace
that cost with the value of employer contributions
payable to the fund in the year. 
The following transactions have been made in the
CIES and the General Fund Balance via the
movement in reserves statement during the year:
Page 207 of 392

Page 208

79 
Annual Accounts 2025/26 PUBLIC
2024/25 2025/26
£m £m
Included within net cost of services:
34.765 Current service cost 25.076
0.665 Past service cost/(gain) 1.905
Included within Financing and Investment income and expenditure:
62.127 Interest cost 66.026
27.231 Interest on the effect of the asset ceiling 43.834
(85.344) Expected return on scheme assets (105.831)
39.444 Total of Post-employment benefits charged to the Surplus/Deficit on the Provision
of Services 31.010
Included within Other Comprehensive Income and Expenditure:
22.312 Return on Assets excluding amounts included in net interest (62.505)
(2.183) Actuarial gains and losses arising on changes in Demographic Assumptions 7.329
(196.867) Actuarial gains and losses arising on changes in Financial Assumptions (34.765)
(14.730) Actuarial gains and losses arising on changes in Other Assumptions 9.629
(594.551) Changes in effect of Asset Ceiling (800.129)
(746.575) Total of LGPS post-employment benefits charged to the CIES (849.431)
Movement in reserves statement:
(787.413) Actuarial losses or (gains) (880.441)
756.295 Restriction on pension asset to Asset Ceiling 865.313
(1.383) Effect of business combinations and disposals 0.000
40.838 Reversal of items relating to post-employment benefits debited or credited to the
Surplus/Deficit on the Provision of Services
31.010
(17.579) Employer contributions and direct payments to pensioners payable in the year (17.326)
(9.242) Movement in the year on the Pension Reserve (1.444) 
The cumulative amount of actuarial gains and losses
recognised in the CIES as at 31 March 2026 is a gain
of £1,180.866m (£1,179.986m gain as at 31 March
2025). 
27c: Assets and liabilities relating to
post-employment benefits
Renfrewshire Council's share of the defined benefit
obligation (that is, the scheme liabilities) and of the
scheme assets in the Strathclyde Pension Fund has
been assessed by Hymans Robertson LLP, the Fund’s
independent actuaries. The assessment indicates
that, as at 31 March 2026, scheme assets exceeded
the defined benefit obligation by £801.519m
(£691.057m excess of obligations over assets as at 31
March 2025). The defined benefit obligation is valued
on an actuarial basis using the “projected unit credit”
method, which estimates the pensions that will be
payable in future years (dependent on assumptions
about mortality rates, salary levels and other factors)
discounted to their present value. The discount rate
used at 31 March 2026 was 6.2% based on the
indicative rate of return on high quality corporate
bonds. Scheme assets are valued at fair value which,
in the case of marketable securities, is market value
using the current bid price. Where no market price is
available, the fair value of scheme assets is
estimated. The valuations are based on the latest
formal valuation of the Strathclyde Pension Fund
which was carried out as at 31 March 2024.
The common position for employers participating in
the Strathclyde Pension Fund is that, based on a
snapshot valuation as at 31 March 2026, a net
pension asset is disclosed as a result of prevailing
market conditions at that date. The net pension
position of £801.519m represents an increase in
asset of £110.462m between 31 March 2025 and 31
March 2026. 
Page 208 of 392

Page 209

80 
Annual Accounts 2025/26 PUBLIC 
The net pension asset has a substantial impact on
the net worth of the Council as recorded in the
balance sheet). However, this surplus of scheme
assets is restricted to the “asset ceiling” i.e., the net
present value of future service costs less net present
value of future contributions over the future working
lifetime as at 31 March 2026. This has been
calculated to be £0 for funded obligations. After
adjusting for the asset ceiling, the balance sheet now
reflects a pension liability of £63.794m, representing
the unfunded obligations of the scheme. 
Local government legislation provides that local
authorities have an obligation to meet the
expenditure of the joint boards of which they are
constituent members. As a consequence,
Renfrewshire Council has additional liabilities arising
from the pension scheme deficits of the Renfrewshire
Valuation Joint Board. In accordance with accounting
regulations, the group accounts include a share of
the post-employment benefits transactions, defined
benefit obligations and scheme assets of this joint
board. Further information can be found in the annual
report and accounts of each joint board. The main
fund (Fund 1) of Strathclyde Pension Fund does not
have an asset and liability matching (ALM) strategy. 
27d: Movement in defined benefit
obligation (scheme liabilities)
The following is a reconciliation of the 2025/26
opening and closing balances of the present value of
Renfrewshire Council’s share of the Strathclyde
Pension Fund’s defined benefit obligation (that is,
scheme liabilities). 
2024/25 2025/26
£m £m
1,297.361 Balance at 1 April 1,144.060
34.765 Current service cost 25.076
0.665 Past service cost (including curtailments) 1.905
62.127 Interest cost 66.026
10.447 Member contributions 11.893
2.686 Effect of business combinations and disposals 0.000
(213.780) Actuarial losses or (gains) (17.807)
Losses or (gains) on curtailment
(5.398) Estimated benefits paid: unfunded (5.340)
(44.813) Estimated benefits paid: other (45.036)
1,144.060 Balance at 31 March 1,180.777 
27e: Movement in scheme assets
The following is a reconciliation of the 2025/26 opening and closing balances of the fair value of Renfrewshire
Council’s share of the Strathclyde Pension Fund’s scheme assets.
Page 209 of 392

Page 210

81 
Annual Accounts 2025/26 PUBLIC
2024/25 2025/26
£m £m
1,790.201 Balance at 1 April 1,835.117
85.344 Expected return on scheme assets 105.831
10.447 Member contributions 11.893
12.181 Employer contributions 11.986
5.398 Contributions in respect of unfunded benefits 5.340
4.069 Effect of business combinations and disposals 0.000
(22.312) Actuarial (losses) or gains 62.505
(5.398) Estimated benefits paid: unfunded (5.340)
(44.813) Estimated benefits paid: other (45.036)
1,835.117 Balance at 31 March 1,982.296 
The expected return on scheme assets is determined by considering the expected returns available on the assets
underlying the current investment policy as provided by the administering authority. Expected yields on fixed
interest investments are based on gross redemption yields as at the balance sheet date. Expected returns on
equity investments reflect long-term real rates of return experienced in the respective markets. 
The actual return on scheme assets from 1 April 2025 to 31 March 2026 was 9.2%. 
The fair value of the assets held in the scheme may be analysed as follows: 
Quoted
Prices in
active
markets
Prices not
quoted in
active
markets
Total Quoted
Prices in
active
markets
Prices not
quoted in
active
markets
Total
£m £m £m £m £m £m
380.164 1.187 381.351 Equity instruments 416.848 1.433 418.281
0.000 424.190 424.190 Private Equity 0.000 475.395 475.395
0.000 138.456 138.456 Real Estate 0.000 137.411 137.411
6.719 839.751 846.470 Investment Funds 0.000 887.283 887.283
0.000 (0.001) (0.001) Derivatives 0.000 0.000 0.000
0.000 44.651 44.651 Cash and cash equivalents 0.000 63.926 63.926
386.883 1,448.234 1,835.117 Fair value of scheme assets 416.848 1,565.448 1,982.296
As at 31 March 2025 As at 31 March 2026
27f: Scheme history: analysis of defined benefit obligation and scheme assets
The Council’s share of the accumulated deficit or surplus in the scheme is shown below. The analysis shows the
nature of various elements of the Council’s share of the scheme’s defined benefit: 
Page 210 of 392

Page 211

82 
Annual Accounts 2025/26 PUBLIC
As at 31
March 2025
As at 31
March 2026
£m £m
(485.593) Current employee members (532.790)
(49.398) Pre-local government reorganisation (1996) liabilities (48.448)
(115.874) Deferred pensioners (117.260)
(427.957) Pensioners (418.485)
(1,078.822) Total Present Value of the Defined Benefit Obligation - Funded liabilities (1,116.983)
1,835.117 Fair value of scheme assets 1,982.296
756.295 Net Asset / (Liability) arising from funded obligations 865.313
(756.295) Restriction to asset ceiling (865.313)
(59.651) Retirals from Renfrewshire Council (58.663)
(5.587) Retirals pre-local government reorganisation (1996) (5.131)
(65.238) Total Present Value of the Defined Benefit Obligation - Unfunded liabilities (63.794)
(65.238) Net Pension Asset / (Liability) (63.794) 
Basis for estimating assets and liabilities 
The following table shows the principal assumptions used by Hymans Robertson LLP, the Fund’s independent
actuaries, to estimate the Council’s post-employment benefits transactions for 2025/26, and the Council’s share
of the Strathclyde Pension Fund’s defined benefit obligation (scheme liabilities) and scheme assets as at 31 March
2026:
2024/25 2025/26
5.8% Discount rate for defined benefit obligation 6.2%
2.7% Long-term expected rate of return on scheme assets* 3.0%
3.5% Rate of increase in salaries 3.7%
2.8% Rate of increase in pensions 3.0%
2.8% Rate of inflation 3.0%
Mortality assumptions (years):
Longevity at age 65 for current pensioners:
19.5 Men 19.9
22.3 Women 22.4
Longevity at age 65 for future pensioners:
20.5 Men 20.8
24.1 Women 24.2
Take up of option to convert annual pension into retirement lump sum
75% For Pre-April 2009 service 75%
75% For Post-April 2009 service 75%
*The expected rates of return are set equal to the discount rate as per IAS19. 
Page 211 of 392

Page 212

83 
Annual Accounts 2025/26 PUBLIC
The estimation of the defined benefit obligations is
sensitive to the actuarial assumptions set out in the
table above. The sensitivity analyses below have
been determined based on reasonably possible
changes of the assumptions occurring at the end of
the reporting period and assumes for each change
that the assumption analysed changes while all the
other assumptions remain constant. The estimations
in the sensitivity analysis have followed the
accounting policies for the scheme, i.e. on an
actuarial basis using the projected unit credit
method. The methods and types of assumptions
used in preparing the sensitivity analysis did not
change from those used in the previous period. The
limitations of methods and assumptions used are
associated with any changes in market conditions
that affect the net discount rate. These can have a
significant effect on the value of the obligations
reported. 
Impact on the Defined Benefit
Obligation on the Scheme % £m
0.1% decrease in the Real Discount
Rate
2% 18.333
1 year increase in the member life
expectancy
4% 47.231
0.1% increase in the Salary
Increase Rate
0% 1.230
0.1% increase in the Pension
Increase Rate
1% 17.079
Impact on the Authority’s cash flows 
An objective of the Fund is to keep employers’
contributions at as constant a rate as possible. The
Fund has agreed a strategy to achieve a funding rate
of 100% in the longer term. Employers’ and
employees’ contributions have been determined so
that rates are standard across all participating
employers. 
The rate for employer contributions has been set at
6.5% for 2025/26, rising to 17.5% in 2026/27. The
total contribution expected to be made by the
Council to the Strathclyde Pension Fund in the
forthcoming year to 31 March 2027 is £29.852m. The
weighted average duration of the defined benefit
obligation is 17 years. 
Note 28: Contingent liabilities 
i) The Council has been notified of a number of
contractor claims for additional costs incurred on
construction contracts. The Council disputes the
claims, which may be referred for arbitration. The
Council recognises a contingent liability for
potential costs, which may be incurred to resolve
this dispute. It is not considered practicable at
this stage to estimate the financial effect.
ii) Following two court cases, including Mrs
Goodwin v Department for Education, it is
expected that proposed changes to public
service pension schemes will be required, to
ensure that surviving same-sex spouses and civil
partners receive benefits equivalent to those
received by the surviving spouses of opposite-
sex marriages. Strathclyde Pension Fund’s
actuary estimates that the potential impact may
be 0.1% of gross obligations, which equates to
£1.141m for the Council. This estimate is not
reflected in the Primary Financial Statements
because the trigger event that would require
recognition has not yet occurred. 
Note 29: Events after the balance
sheet date 
Events taking place after the authorised date for issue
per the balance sheet are not reflected in the
financial statements or notes.  Where events taking
place before this date provided information about
conditions existing at 31 March 2026, the figures in
the financial statements and notes have been
adjusted in all material respects to reflect the impact
of this information. 
Note 30: Accounting Standards
Issued not Adopted 
The Code requires the disclosure of information
relating to the impact of an accounting change that
Page 212 of 392

Page 213

84 
Annual Accounts 2025/26 PUBLIC
will be required by a new standard that has been
issued but not yet adopted.  
The following new standards and amendments to
existing standards have been published but not yet
adopted by the Code:
• Amendments to the Classification and
Measurement of Financial Instruments
(amendments to IFRS 9 and IFRS 7) issued in May
2024. 
• Contracts referencing nature dependent
electricity (amendments to IFRS 9 and IFRS 7)
issued in December 2024. 
There is no material impact anticipated in future
years from the implementation of these standards. 
Note 31: Accounting Policies –
Renfrewshire Council 
The Financial Statements for the year ended 31
March 2026 have been prepared in accordance with
proper accounting practice as per section 12 of the
Local Government in Scotland Act 2003. Proper
accounting practice comprises the Code of Practice
on Local Authority Accounting in the United Kingdom
(the Accounting Code) and the Service Reporting
Code of Practice, supported by International
Financial Reporting Standards and recommendations
made by the Local Authority (Scotland) Accounts
Advisory Committee (LASAAC). They are designed to
give a true and fair view of the financial performance
and position of the Council and comparative figures
for the previous financial year are provided. There are
no significant departures from these
recommendations.   
The accounts have been prepared under the historic
cost convention, other than changes resulting from
the revaluation of certain categories of non-current
assets and financial instruments, and on a going
concern basis. 
A Accruals of Expenditure and Income 
Activity is accounted for in the year that it takes
place, not simply when cash payments are made or
received. In particular:
i) Revenue from the sale of goods or provision of
services is recognised when the performance
obligation relating to the transaction has been
satisfied, and it is probable that the economic
benefits or service potential associated with the
transaction will flow to the Council.
ii) Supplies are recorded as expenditure when they
are consumed. Where there is a gap between the
date supplies are received and their
consumption, they are carried as inventories on
the Balance Sheet. Works are charged as
expenditure when they are completed, before
which they are carried as assets under
construction on the Balance Sheet.
iii) Interest payable on borrowings and receivable on
investments is accounted for on the basis of the
effective interest rate for the relevant financial
instrument. Interest receivable and dividend
income is recognised when it is probable that the
economic benefits or service potential
associated with the transaction will flow to the
Council.
iv) Where income and expenditure have been
recognised but cash has not been received or
paid, a debtor or creditor for the relevant amount
is recorded in the Balance Sheet. Where there is
evidence that debts are unlikely to be settled, the
balance of debtors is written down and a charge
made to revenue for the income that might not be
collected.
v) Supplier invoices paid in the two weeks following
the year-end are accrued together with specific
accruals in respect of further material items
provided the goods or services were received by
31 March 2026 or relate to services associated
with the prior financial year. 
Page 213 of 392

Page 214

85 
Annual Accounts 2025/26 PUBLIC
B Business Improvement District 
Following the formation of the Paisley First BID
company on 15 January 2015, the Council has
entered into an agreement to act as the billing body
for the purposes of the Planning etc. (Scotland) Act
2006 and the Regulations and is responsible for the
administration, collection and recovery of the BID
Levy.  As the Council is acting as agent for the BID
company, no transactions in relation to the BID levy
or BID Revenue Account are included in the CIES with
the exception of any contribution made by the
Council to the BID project, the costs and income
related to the collection of the BID levy or any income
from the BID company in relation to services
provided. 
C Cash and Cash Equivalents 
Cash is defined as cash in hand and deposits
repayable on demand less overdrafts repayable on
demand. Cash equivalents are defined as call
accounts, money market funds and instant deposits.
Fixed term deposits are not classified as cash or cash
equivalents as these are held for investment
purposes rather than for meeting short-term cash
commitments. 
D Charges for the Use of Assets 
Services are charged for the use of assets no matter
how they are financed, and this charge includes a
provision for depreciation where appropriate. 
E Contingent Assets and Liabilities 
Contingent assets and liabilities are not recognised in
the financial statements but are disclosed as a note
to the accounts where they are deemed material. 
F Employee Benefits 
Benefits payable during employment 
All salaries and wages earned up to 31 March 2026
are included in the Accounts irrespective of when
payment was made. An accrual is made for the cost
of holiday entitlements earned by employees, but not
taken before the year end and which employees may
carry forward into the next financial year; along with
any pay inflation agreed for the year and not yet paid. 
Termination benefits 
Termination benefits are amounts payable as a result
of a decision by the Council to terminate an officer’s
employment before the normal retirement date or an
officer’s decision to accept voluntary redundancy.
They are charged on an accruals basis to the relevant
service line in the CIES when the Council is
demonstrably committed to either terminating the
employment of an officer or making an offer to
encourage voluntary redundancy. The Council is only
demonstrably committed to a termination when it
has a detailed formal plan for the termination, and it
is without realistic possibility of withdrawal. 
Where termination benefits involve the enhancement
of pensions, statutory provisions require the General
Fund balance to be charged with the amount payable
by the Council to the pension fund or pensioner in the
year, not the amount calculated according to the
relevant accounting standards. In the Movement in
Reserves Statement, appropriations are required to
and from the Pensions Reserve to remove the
notional debits and credits for pension enhancement
termination benefits and to replace them with debits
for the cash paid to the pension fund and pensioners
and any such amounts payable but unpaid at the
year-end. 
Post-employment benefits 
The Council participates in two formal pension
schemes: the Local Government Pension Scheme
which is administered by Strathclyde Pension Fund;
and the Scottish Teachers’ Superannuation Scheme.
Liabilities for the Scottish Teachers’ Superannuation
Scheme cannot be identified specifically to the
Council; therefore, the scheme is accounted for as a
defined contributions scheme. 
Page 214 of 392

Page 215

86 
Annual Accounts 2025/26 PUBLIC
The Local Government Pension Scheme is accounted
for as a defined benefit scheme in accordance with
International Accounting Standard 19 (IAS19) (as
revised in 2011). Renfrewshire Council's share of the
net pension asset or liability in Strathclyde Pension
Fund and a pension reserve are recognised in the
Balance Sheet. The CIES recognises changes during
the year in the pension asset or liability. Service
expenditure includes pension costs based on
employers' pension contributions payable and
payments to pensioners in the year. Liabilities are
included in the Balance Sheet on an actuarial basis
using the projected unit method. Liabilities are
discounted to their value at current prices using a
discount rate based on the indicative rate of return on
high quality corporate bonds. Assets are included in
the Balance Sheet at their fair value, principally the
bid price for quoted securities, and estimated fair
value for unquoted securities. 
G Events after the Balance Sheet date 
Events after the Balance Sheet date are those events
that occur between the end of the reporting period
and the date when the Statements are authorised for
issue. There are two types of events:
• Adjusting events – those that provide evidence of
conditions that existed at the end of the reporting
period, and the Statements are adjusted to reflect
such events
• Non-adjusting events – those that are indicative of
conditions that arose after the reporting period,
and the Statements are not adjusted. 
Events taking place after the date of authorisation for
issue are not reflected in the Statements. 
H Prior Period Adjustments 
When items of income and expense are material,
their nature and amount is disclosed separately,
either on the face of the CIES or in the notes to the
accounts, depending on how significant the items are
to an understanding of the Council’s financial
performance. 
Where there has been a change in accounting policy,
that change will be applied retrospectively.  Where
there has been a change in accounting estimate, that
change will be applied prospectively. Where a
material misstatement or omission has been
discovered relating to a prior period, that
misstatement or omission will be restated unless it is
impracticable to do so. 
I Financial Instruments 
Financial Assets 
Financial assets are classified into three categories of
valuation:
• At amortised cost;
• At fair value through other comprehensive income
– designated equity instruments; and
• At fair value through profit or loss.
Financial Assets Measured at Amortised Cost 
Financial assets measured at amortised cost are
recognised on the Balance Sheet when the Council
becomes a party to the contractual provisions of a
financial instrument and are initially measured at fair
value. They are subsequently measured at their
amortised cost. Annual credits to the Financing and
Investment Income and Expenditure line in the CIES
for interest receivable are based on the carrying
amount of the asset multiplied by the effective rate of
interest for the instrument. For most of the loans
made by the Council, this means that the amount
presented in the Balance Sheet is the outstanding
principal receivable (plus accrued interest) and
interest credited to the CIES is the amount receivable
for the year in the loan agreement. 
Any gains and losses that arise on the derecognition
of an asset are credited or debited to the Financing
and Investment Income and Expenditure line in the
CIES. The Council has assets such as investments
and debtors which are classified as financial assets
measured at amortised cost. 
Page 215 of 392

Page 216

87 
Annual Accounts 2025/26 PUBLIC
Financial Assets Measured at Fair Value through other
Comprehensive Income (FVOCI) 
Financial assets that are measured at FVOCI are
recognised on the Balance Sheet when the Council
becomes party to the contractual provisions of a
financial instrument and are initially measured and
carried at fair value. Investment income is credited to
Financing and Investment Income and Expenditure in
the CIES when it becomes receivable by the Council.
Where an equity instrument is designated as FVOCI,
changes in fair value are posted to Other
Comprehensive Income and Expenditure and are
balanced by an entry in the Financial Instruments
Revaluation Reserve (an unusable reserve). 
When the asset is derecognised, the cumulative gain
or loss previously recognised in Other
Comprehensive Income and Expenditure is
transferred from the Financial Instruments
Revaluation Reserve and recognised in the Surplus or
Deficit on the Provision of Services. The Council has
made an irrevocable election to designate these
assets as FVOCI on the basis that they are held for
non-contractual benefits, not for trading, but for
strategic purposes. 
Financial assets measured at fair value through profit
and loss 
Assets are recognised on the Balance Sheet when the
Council becomes a party to the contractual
provisions of a financial instrument and are initially
measured and carried at fair value. Where there are
no fixed or determinable payments, income (e.g.
dividends) is credited to the CIES when it becomes
receivable by the Council. 
Assets values are based on the following principles:
• instruments with quoted market prices – the
market price
• other instruments with fixed and determinable
payments – discounted cash flow analysis
• equity shares with no quoted market prices –
independent appraisal of company valuations.
Any gains and losses that arise on the derecognition
of the asset are credited/debited to the Financing and
Investment Income and Expenditure line in the CIES.
Where fair value cannot be measured reliably, the
instrument is carried at cost (less any impairment
losses). 
Expected Credit Loss Model 
Where assets are identified as impaired as a result of
an expected credit loss, the asset is written down and
a charge made to the Financing and Investment
Income and Expenditure line in the CIES. If the asset
has fixed or determinable payments, the impairment
loss is measured as the difference between the
carrying amount and the present value of the revised
future cash flows discounted at the asset’s original
effective interest rate. Otherwise, the impairment
loss is measured as any shortfall of fair value against
the acquisition cost of the instrument (net of any
principal repayment and amortisation). 
Financial Liabilities 
Financial liabilities are recognised on the Balance
Sheet when the Council becomes a party to the
contractual provisions of a financial instrument and
initially measured at fair value and carried at their
amortised cost. Annual charges to the Financing and
Investment Income and Expenditure line in the CIES
for interest payable are based on the carrying amount
of the liability, multiplied by the effective rate of
interest for the instrument. The effective interest rate
is the rate that exactly discounts estimated future
cash payments over the life of the instrument to the
amount at which it was originally recognised. For
most of the borrowings that the Council has, this
means that the amount presented in the Balance
Sheet is the outstanding principal repayable (plus
accrued interest) and interest charged to the CIES is
the amount payable for the year according to the loan
agreement. 
Gains and losses on the repurchase or early
settlement of borrowing are credited and debited to
the Financing and Investment Income and
Expenditure line in the Income and Expenditure
Account in the year of extinguishment. However,
where repurchase has taken place as part of a
restructuring of the loan portfolio that involves the
Page 216 of 392

Page 217

88 
Annual Accounts 2025/26 PUBLIC
modification or exchange of existing instruments, the
premium or discount is respectively deducted from or
added to the amortised cost of the new or modified
loan and the write-down to the CIES is spread over
the life of the loan by an adjustment to the effective
interest rate. 
Where premiums and discounts have been charged
to the CIES, regulations allow the impact on the
General Fund Balance to be spread over future years.
The Council has a policy of spreading the gain/loss
over the term that was remaining on the loan against
which the premium was payable or discount
receivable when it was repaid. The reconciliation of
amounts charged to the CIES to the net charge
required against the General Fund Balance is
managed by a transfer to or from the Financial
Instruments Adjustment Account in the Movement in
Reserves Statement. 
Financial Guarantees 
Financial guarantees are recognised at fair value
assessed as the probability of the guarantees being
called and the likely amount payable under the
guarantees. 
Loans Fund 
The Council operates a Loans Fund and all loans
raised are paid into the Fund.  Advances are made to
departments to finance capital expenditure during
the year. Repayments to the Loans Fund are
calculated using the annuity method. 
The local Authority (Capital Financing and Accounting)
(Scotland) Regulations 2016 - loans fund accounting
came into force on 1 April 2016 and replaced the
statutory provisions for local authority borrowing,
lending and loans funds as set out in Schedule 3 of the
local Authority (Scotland) Act 1975. The regulations
contain the following provisions in respect of the loans
fund:
• Regulation 12 places a duty on a local authority to
maintain a loans fund, which is to be administered
in accordance with the proper accounting
practices and prudent financial management; 
• Regulation 13 requires a local authority to make
loans fund advances each year for expenditure of
or lending to third parties by, the local authority
which it has determined should be met from
borrowing; and 
• Regulation 14 requires a local authority to
determine for each loans fund advance the period
over which it will be repaid and the amount of each
repayment. Both the period and the annual
amounts must be considered by the authority to
be prudent. 
Interest is calculated and allocated to the CIES in
accordance with Local Authorities Scotland
Accounts Advisory Committee’s (LASAAC) Guidance
Note 2: Statement on the Calculation and Allocation
of Loans Fund Interest and Expenses. 
Financial Instruments - Fair Value
Measurement 
Fair value is defined as the price that would be
received to sell an asset or paid to transfer a liability
in an orderly transaction between market participants
at the measurement date. The fair value
measurement assumes that the transaction to sell
the asset or transfer the liability take place either in
the principal market for that asset or liability or, in the
absence of a principal market, in the most
advantageous market for the asset or liability. 
The fair value of an asset or liability is measured using
the assumptions that market participants would use
when pricing the asset or liability, assuming that
market participants act in their economic best
interest. 
Valuation techniques used are appropriate in the
circumstances and have sufficient data available,
maximising the use of relevant observable inputs and
minimising the use of unobservable inputs. 
Inputs to the valuation techniques in respect of
assets and liabilities for which fair value is measured
or disclosed in the financial statements are
categorised within the fair value hierarchy, as follows: 
Page 217 of 392

Page 218

89 
Annual Accounts 2025/26 PUBLIC
• Level 1 – quoted prices (unadjusted) in active
markets for identical assets or liabilities that the
authority can access at the measurement date 
• Level 2 – inputs other than quoted prices included
within Level 1 that are observable for the asset or
liability, either directly or indirectly 
• Level 3 – unobservable inputs for the asset or
liability. 
The fair value hierarchy gives priority to quoted prices
(unadjusted) in active markets for identical assets or
liabilities (Level 1 inputs) and the lowest priority to
unobservable inputs (Level 3 inputs). 
J Government Grants and other
Contributions
Government grants and third-party contributions and
donations are recognised as due to the Council when
there is reasonable assurance that:
• the Council will comply with the conditions
attached to the payments; and
• the grants or contributions will be received. 
Amounts recognised as due to the Council are not
credited to the CIES until conditions attaching to the
grant or contribution have been satisfied. Monies
advanced as grants and contributions for which
conditions have not been satisfied are carried in the
Balance Sheet as creditors. When conditions are
satisfied, the grant or contribution is credited to the
relevant service line or Taxation and Non-Specific
Grant Income in the CIES. 
Where capital grants are credited to the CIES, they
are reversed out of the General Fund Balance in the
Movement in Reserves Statement. Where the grant
has yet to be used to finance capital expenditure, it is
posted to the Capital Grants Unapplied Account.
Where it has been applied, it is posted to the Capital
Adjustment Account. Amounts in the Capital Grants
Unapplied Account are transferred to the Capital
Adjustment Account once they have been applied.
K Heritage Assets 
The Council’s heritage assets are held in the
museums operated by OneRen (Paisley Museum and
Art Gallery, Renfrew Town Hall and Museum, and The
Secret Collection). The purpose of holding these
assets according to the Museums’ Statement of
Purpose is “to enhance public understanding of the
human and natural world, principally by the use of
original objects”. 
Heritage assets are recognised and measured
(including the treatment of revaluation gains and
losses) in accordance with the Council’s accounting
policies on property, plant, and equipment. However,
some of the measurement rules are relaxed in
relation to heritage assets. 
The accounting policies in relation to heritage assets
that are deemed to include elements of intangible
heritage assets are also presented below. Purchased
acquisitions are recognised at cost and donated
acquisitions are recognised at valuation with
reference to appropriate commercial markets. 
Acquisitions are made in line with the approved
Acquisition and Disposal Policy. The collections of
heritage assets are accounted for as follows: 
Art Collection The collection includes fine, contemporary and applied art works. The collection is
included in the balance sheet at market value where this is available (from external
valuations provided by suitably experienced and knowledgeable experts) or insurance
valuations provided by the relevant collection curator. The assets within the collection
are deemed to have indeterminate lives and a high residual value, and therefore no
depreciation is charged.
Page 218 of 392

Page 219

90 
Annual Accounts 2025/26 PUBLIC
Shawl and textile
design 
The museums hold a collection of approximately 1,000 Paisley-type shawls, and a
considerable collection of original designs for shawl manufacture. The collection is
included in the balance sheet at insurance valuation which is based on market values.
The assets within the collection are deemed to have indeterminate lives and a high
residual value, and therefore no depreciation is charged.
Natural History The collection includes vertebrate and invertebrate zoology, botany, geology and
microslide collections; in addition to a library of natural history books.
The collection is included in the balance sheet at insurance valuation which is based on
market values. The assets within the collection are deemed to have indeterminate lives
and a high residual value, and therefore no depreciation is charged.
Human History The museums hold collections relating to social history, transport, science (including an
important collection of astronomical apparatus in Coats Observatory), archaeology,
arms, local archives, numismatics, photography, textiles, ethnography and Egyptology.
The collection is included in the balance sheet at insurance valuation which is based on
market values. However, where an external valuation or cost information is available, or
a valuation may be secured at a cost which is not prohibitive relative to the value of the
item, then the Council will recognise the asset in the balance sheet at this value. The
assets within the collection are deemed to have indeterminate lives and a high residual
value, and therefore, no depreciation is charged.
In addition to the museum collections, there are a
number of public space statues, monuments,
memorials, fountains and outdoor artworks at
various locations throughout Renfrewshire. These
assets are not generally recognised in the balance
sheet. The Council considers that obtaining
valuations would involve disproportionate cost and
that reliable cost or valuation information cannot be
obtained for these items. This is because of the
diverse nature of assets held, the number of assets
and the lack of comparable data. However, where
reliable cost information can be reasonably obtained,
the asset will be included in the balance sheet. 
The carrying amounts of heritage assets are reviewed
where there is evidence of impairment for heritage
assets, eg where an item has suffered physical
deterioration or breakage or where doubts arise as to
its authenticity. Any impairment is recognised and
measured in accordance with the Council’s general
policies on impairment. 
Heritage assets will occasionally be disposed of in
accordance with the approved Acquisitions and
Disposal Policy (a copy of which is available). Assets
are only disposed of for curatorial reasons (eg the
item has deteriorated to such an extent it is no longer
suitable for public display) and not with the aim of
generating funds. Any proceeds of such items are
accounted for in accordance with the Council’s
general provisions relating to the disposal of property,
plant and equipment. Disposal proceeds are
disclosed separately in the notes to the financial
statements and are accounted for in accordance with
statutory accounting requirements relating to capital
expenditure and capital receipts. 
Expenditure incurred in preserving individual items is
recognised in the CIES. 
L Intangible Assets 
The Council accounts for purchased software
licences as Intangible Assets. Expenditure on
intangible assets is capitalised when it is expected
that future economic benefits or service potential will
flow from the intangible asset to the Council. Items
costing less than £10,000 are not treated as
Intangible Assets. 
Intangible assets are measured initially at cost.
Amounts are not revalued, as the fair value of the
assets held by the Council cannot be determined by
Page 219 of 392

Page 220

91 
Annual Accounts 2025/26 PUBLIC
reference to an active market. The depreciable
amount of an intangible asset is amortised over its
useful life. An asset is tested for impairment
whenever there is an indication that the asset might
be impaired. Any gain or loss arising on the disposal
or abandonment of an intangible asset is posted to
the Other Operating Expenditure line in the CIES. 
Where expenditure on intangible assets qualifies as
capital expenditure for statutory purposes,
amortisation, impairment losses and disposal gains
and losses are not permitted to have an impact on
the General Fund Balance. The gains and losses are
therefore reversed out of the General Fund Balance in
the Movement in Reserves Statement and posted to
the Capital Adjustment Account and (for any sale
proceeds greater than £10,000) the Capital Receipts
Reserve. 
M Interests in Companies and Other
Entities 
The Council has material interests in two charitable
companies, two limited liability partnership and Joint
Boards and Committees that have the nature of
subsidiaries and associates under accounting
conventions, requiring it to prepare group accounts.
In the Council’s own single-entity accounts, these
interests are not recorded as the Council has no
shares in, or ownership of, any of these
organisations. 
Reflected in the Council’s single-entity balance sheet
is a 50% share in an Integration Joint Board, which is
recorded as an investment. 
N Inventories 
Inventories (generally consumable stock) are
included in the Balance Sheet at weighted average
cost. The Code requires inventories to be held at
lower of cost or Net Realisable Value. Weighted
average cost is used as the measure of cost. 
O Investment Property 
Investment properties are those that are used solely
to earn rentals and/or for capital appreciation.
Investment properties are measured initially at cost
and subsequently at fair value. Properties are not
depreciated but are revalued annually according to
market conditions at the year-end. Gains and losses
on revaluation are posted to the Financing and
Investment Income and Expenditure line in the CIES.
The same treatment is applied to gains and losses on
disposal. 
Rentals received in relation to investment properties
are credited to the Financing and Investment Income
line and result in a gain for the General Fund Balance. 
However, revaluation and disposal gains and losses
are not permitted by statutory arrangements to have
an impact on the General Fund Balance. The gains
and losses are therefore reversed out of the General
Fund Balance in the Movement in Reserves
Statement and posted to the Capital Adjustment
Account and (for any sale proceeds greater than
£10,000) the Capital Receipts Reserve. 
P Leases 
The Council as Lessee 
Right of use assets
As a lessee, The Council previously classified leases
as operating or finance leases based on its
assessment of whether the lease significantly
transferred all of the risks and rewards incidental to
ownership of the underlying asset to the Council.
Under IFRS 16, the Council recognises right of use
assets and corresponding lease liabilities for most
lease arrangements. 
The Council has elected to apply recognition
exemptions and will not recognise right of use assets
and lease liabilities for short term leases that have a
term of 12 months or less and leases of a low value,
under £10,000. The Council will recognise the lease
payments associated with these leases as an
expense on a straight-line basis over the lease term. 
Page 220 of 392

Page 221

92 
Annual Accounts 2025/26 PUBLIC
At the commencement date, a lease liability will be
measured at the present value of the lease payments
that are not paid at that date. The lease payments
shall be discounted using the interest rate implicit in
the lease, if that rate can be readily identified. If that
rate cannot be readily determined, the Council’s
incremental borrowing rate will be used. 
Right of use assets are measured either at:
• An amount equal to the lease liability;
• Their carrying amount at the commencement
date;
• For right of use assets for nominal lease
payments, right of use assets shall be recognised
at fair value as at commencement date. Any gain
being the difference between that fair value and
lease liability, recognised as a donated asset on
the commencement date. 
The Council as Lessor 
Finance Leases
Where the Council grants a finance lease over a
property or an item of plant or equipment, the
relevant asset is written out of the Balance Sheet as a
disposal. 
Lease rentals receivable are apportioned between:
• a capital receipt for the disposal of the asset –
applied to write down the Debtor (together with
any premiums received); and
• finance income (credited to the CIES). 
Operating Leases
Where the Council grants an operating lease over a
property or an item of plant or equipment, the asset is
retained in the Balance Sheet. Rental income is
credited to the CIES. 
Q Overheads and Central Support
Costs 
Where internal costs are allocated to user
departments, the basis of allocation varies by
originating department, for example the cost of
Payroll Services may be allocated on the number of
payslips per service.  In many instances the
allocation is time-based.  Internal transactions are no
longer present in the income and expenditure figures
reported in the CIES. 
R Service Concession Arrangements –
School Buildings and Other Facilities 
The Council carries the assets used under PFI or
Service Concession contracts on its Balance Sheet
as part of Property, Plant and Equipment. The original
recognition of these assets at fair value (based on the
cost to purchase the property, plant and equipment)
was balanced by the recognition of a liability for
amounts due to the scheme operator to pay for the
capital investment. 
The accounting treatment of the contractual
arrangements are in accordance with IFRIC12 Service
Concession Arrangements. 
S Property, Plant and Equipment 
Assets that have physical substance and are held for
use in the production or supply of goods or services,
for rental to others or for administrative purposes,
and that are expected to be used during more than
one financial year are classified as Property, Plant
and Equipment. 
Recognition
Expenditure on the acquisition, creation or
enhancement of Property, Plant and Equipment is
capitalised on an accruals basis. Expenditure that
maintains but does not add to an asset’s potential to
deliver future economic benefits or service potential
is charged as an expense when it is incurred. 
Measurement
Assets are initially measured at cost, comprising:
• the purchase price;
• any costs attributable to bringing the asset to the
location and condition necessary for it to be
capable of operating.
Page 221 of 392

Page 222

93 
Annual Accounts 2025/26 PUBLIC
The cost of assets acquired other than by purchase is
deemed to be its fair value. The valuation of work-in-
progress is based on cost plus an appropriate
proportion of overheads, together with attributable
profits and allowances for foreseeable losses. 
Plant, furniture and computer equipment costing less
than £10,000 are not treated as fixed assets. This de-
minimis level does not apply where certain categories
of these assets are grouped together and form part of
the approved capital programme. 
Donated assets are measured initially at fair value.
The difference between fair value and any
consideration paid is credited to the CIES. Where
gains are credited to the CIES, they are reversed out
of the General Fund Balance to the Capital
Adjustment Account. 
Assets are then carried in the Balance Sheet using the
following measurement bases:
• infrastructure, community assets and assets
under construction – depreciated historical cost;
• council dwellings – fair value, determined using
the basis of existing use value for social housing
(EUV-SH). Council dwellings are valued using a
Beacon Principle (adjusted vacant possession)
methodology in accordance with the Royal
Institution of Chartered Surveyors (RICS)
guidance;
• Vehicles, plant, furniture and equipment –
depreciated replacement cost;
• Other land and buildings – fair value, determined
as the market value amount that would be paid for
the asset in its existing use (existing use value –
EUV). Operational assets are shown at the lower of
net current replacement cost or net realisable
value in existing use. Non-operational assets are
shown at the lower of net current replacement
cost or net realisable value.
Where there is no market-based evidence of fair
value because of the specialist nature of an asset,
depreciated replacement cost is used as an estimate
of fair value. 
Assets included in the Balance Sheet at fair value are
revalued sufficiently regularly to ensure that their
carrying amount is not materially different from their
fair value at the year-end, but as a minimum every
five years. The effective date of any revaluation is 31
March.  Valuations are undertaken by the Council
Valuer who is MRICS qualified. Increases in
valuations are matched by credits to the Revaluation
Reserve to recognise unrealised gains. The
Revaluation Reserve contains revaluation gains
recognised since 1 April 2007 only, the date of its
formal implementation. Gains arising before that
date have been consolidated into the Capital
Adjustment Account. 
From 1 April 2025, the Code of Practice on Local
Authority Accounting (the Code) requirements
changed in respect of revaluations of property, plant
and equipment. 
The Council will revalue assets over a rolling
programme of revaluations over a five year cycle with
annual indexation applied during the 4 intervening
years. If the total annual indexation is material then
the carrying amount of the assets will be revalued to
the indexation amount using the Elimination Method,
where accumulated depreciation will be eliminated
against the gross carrying amount of the asset, after
taking into account accumulated impairment losses. 
Fair Value Measurement
The authority measures some of its non-financial
assets such as surplus assets and investment
properties at fair value at each reporting date. Fair
value is the price that would be received to sell an
asset in an orderly transaction between market
participants at the measurement date. The authority
uses valuation techniques that are appropriate in the
circumstances and for which sufficient data is
available, maximising the use of relevant observable
inputs and minimising the use of unobservable
inputs. 
Inputs to the valuation techniques in respect of
assets for which fair value is measured are
categorised within the fair value hierarchy as follows:
Page 222 of 392

Page 223

94 
Annual Accounts 2025/26 PUBLIC
• Level 1 - quoted prices in active markets for
identical assets that the authority can access at
the measurement date;
• Level 2 - inputs other than quoted prices included
within level 1 that are observable for the asset,
either directly or indirectly;
• Level 3 - unobservable inputs for the asset. 
Impairment
Assets are assessed at each year-end as to whether
there is any indication that an asset may be impaired.
Where indications exist and any possible differences
are estimated to be material, the recoverable amount
of the asset is estimated, and an impairment loss is
recognised for the shortfall. 
Where impairment losses are identified, they are
accounted for as follows:
• where there is a balance of revaluation gains for
the asset in the Revaluation Reserve, the carrying
amount of the asset is written down against that
balance (up to the amount of the accumulated
gains);
• where there is no balance in the Revaluation
Reserve, the carrying amount of the asset is
written down against the relevant service line(s) in
the CIES. 
Where an impairment loss is reversed subsequently,
the reversal is credited to the relevant service line(s)
in the CIES, up to the amount of the original loss,
adjusted for depreciation that would have been
charged if the loss had not been recognised. 
Disposals
When it becomes probable that the carrying amount
of an asset will be recovered principally through a
sale transaction rather than through its continuing
use, it is reclassified as an Asset Held for Sale. The
asset is revalued immediately before reclassification
and then carried at the lower of this amount and fair
value less costs to sell. Where there is a subsequent
decrease to fair value less costs to sell, the loss is
posted to the Other Operating Expenditure line in the
CIES. Gains in fair value are recognised only up to the
amount of any previously losses recognised in the
Surplus or Deficit on Provision of Services. 
Depreciation is not charged on Assets Held for Sale.
Assets that are to be abandoned or scrapped are not
reclassified as Assets Held for Sale. 
When an asset is disposed of or decommissioned,
the carrying amount of the asset in the Balance Sheet
(whether Property, Plant and Equipment or Assets
Held for Sale) is written off to the Other Operating
Expenditure line in the CIES as part of the gain or loss
on disposal. Receipts from disposals (if any) are
credited to the CIES also as part of the gain or loss on
disposal (i.e. netted off against the carrying value of
the asset at the time of disposal). Any revaluation
gains accumulated for the asset in the Revaluation
Reserve are transferred to the Capital Adjustment
Account. 
Amounts received for a disposal in excess of £10,000
are categorised as capital receipts and are credited
to the Capital Receipts Reserve. 
Depreciation
Depreciation is provided for on all Property, Plant and
Equipment assets by the allocation of their
depreciable amounts over their useful lives. An
exception is made for assets without a determinable
finite useful life, investment properties and assets
that are not yet available for use (i.e., assets under
construction). When surplus assets are revalued, the
useful life of the asset is updated and depreciation
recalculated on that basis. 
Deprecation is calculated on the following bases:
• dwellings and other buildings – straight-line
allocation over the useful life of the property of
between 10 and 50 years as estimated by the
Council Valuer;
• vehicles, plant and equipment – a percentage of
the value of each class of assets in the Balance
Sheet, as advised by a suitably qualified officer
based on useful lives of between 3 and 30 years;
Page 223 of 392

Page 224

95 
Annual Accounts 2025/26 PUBLIC
• infrastructure – straight-line allocation based on
useful lives of between 10 and 60 years.
General Fund services are charged with depreciation
where appropriate for the use of assets no matter
how they are financed. Depreciation on the Council’s
non-operational assets is not charged to service
revenue accounts. It is however reflected in the CIES
through non-distributable costs.   
Where an item of Property, Plant and Equipment
asset has major components whose cost is
significant in relation to the total cost of the item, the
components are depreciated separately. Significance
is determined by comparing a component’s cost
against the overall cost of an asset, and a component
is deemed significant if its cost is 20% or more of the
total asset cost. The de-minimis threshold for
componentisation is £1m. 
Revaluation gains are also depreciated, with an
amount equal to the difference between current
value depreciation charged on assets and the
depreciation that would have been chargeable based
on their historical cost being transferred each year
from the Revaluation Reserve to the Capital
Adjustment Account. 
T Provisions 
Provisions are made where an event has taken place
that gives the Council a legal or constructive
obligation that probably requires settlement by a
transfer of economic benefits or service potential,
and a reliable estimate can be made of the amount of
the obligation. Provisions are charged as an expense
to the appropriate service line in the CIES. When
payments are eventually made, they are charged to
the provision carried in the Balance Sheet. Estimated
settlements are reviewed at the end of each financial
year. 
U Reserves 
The Council has various reserve funds. The two
capital reserves arising from the system of capital
accounting are the Revaluation Reserve and the
Capital Adjustment Account. The former of these
represents the store of gains on revaluation of fixed
assets not yet realised through sales and the latter
relates to amounts set aside from capital resources
to meet past expenditure. 
The two accounting reserves arising from the
restatement of financial instruments to “fair value”
are the Financial Instruments Adjustment Account
and the Financial Instruments Revaluation Reserve.
The Financial Instruments Adjustment Account is a
balancing account to allow for differences in
statutory requirements and proper accounting
practices for lending & borrowing by the Council. The
Financial Instruments Revaluation Reserve is a store
of gains or losses on revaluation of the investments of
the Insurance Fund not yet realised through sales.   
The Pension Reserve arises from the IAS19
accounting disclosures for retirement benefits and
recognises the Council's share of actuarial gains and
losses in the Strathclyde Pension Fund and the
change in the Council’s share of the Pension Fund
net liability chargeable to the CIES. 
V Revenue Expenditure Funded from
Capital under Statute 
Expenditure incurred during the year that may be
capitalised under statutory provisions but does not
result in the creation of a non-current asset has been
charged as expenditure to the relevant service in the
CIES in the year. Where the Council has determined
to meet the cost of this expenditure from existing
capital resources or by borrowing, a transfer in the 
Movement in Reserves Statement from the General
Fund Balance to the Capital Adjustment Account
then reverses out the amounts charged so that there
is no impact on the level of Council Tax. 
W Value Added Tax 
Income and Expenditure excludes any amount
relating to Value Added Tax (VAT), as all VAT is
payable to HM Revenue & Customs and all VAT is
recoverable from them.
Page 224 of 392

Page 225

96 
Annual Accounts 2025/26 PUBLIC
Note 32: Judgements in Applying Accounting Policies 
In applying the accounting policies, the Council has had to make certain judgements about complex transactions
or those involving uncertainty about future events. Where a judgement has been made, this is referred to in the
relevant note to the core financial statements; however, a summary of those with the most significant effect is
detailed below. 
Item Judgement
Public Sector
Funding
The Council has assessed that anticipated levels of local government funding over the
medium term do not provide sufficient indication that the assets of the Council might be
impaired as a result of a need to close facilities and reduce levels of service provision. The
medium term outlook is discussed further in the Management Commentary.
Service Concession
Arrangements
The Council is deemed to control the services provided under the agreement for the
provision of schools. The accounting policies for PFI schemes and similar arrangements
have been applied and the assets under the contract are included within Property, Plant
and Equipment on the Council’s Balance Sheet.  Bargeddie Waste Facility is shared by a
number of Scottish councils with North Lanarkshire Council taking the lead.  The
apportionment of costs and liabilities over the life of the facility, which was funded by a
service concession agreement, has been agreed between the councils involved and the
local external audit team. Note 14 provides further details.
Impairment of
financial assets
In line with IFRS9: Financial Instruments, the approach to impairment of financial assets
depends on the type of asset being assessed, either using a ‘historic loss rate’ approach,
or a ‘probability of default’ approach, whereby historical experience of default rates
across a similar class of instrument and credit rating is used to estimate 12-month
expected credit losses. Further detail can be found at Note 21: Financial Instruments.
Determination of
Contingent
Liabilities and
Provisions
A Provision is defined by the Code as a liability of uncertain timing or amount. A
Contingent Liability is a possible obligation whose timing or value cannot be reliably
measured and the Council makes a judgement on which is appropriate based on
information available at the Balance Sheet date.
Rolling Valuation
Programme
The Council employs professional valuers who are registered with the Royal Institution of
Chartered Surveyors. These valuers carry out regular reviews of the value of assets
reported in the Balance Sheet and any significant changes in value are processed as asset
revaluations or impairments. These values are based on their professional opinion using
available market information at the time of assessment. Due to the high number of assets,
a rolling programme of asset valuation has been established for many years, with the aim
one fifth of the portfolio each financial year. This carries inherent risk that assets not
valued in-year have been subject to material changes in value. The highest risk in this
respect relates to assets valued using the Depreciated Replacement Cost (DRC) method,
which for Renfrewshire Council, includes schools and leisure centres. To mitigate for this
risk, annual indexation is applied during the four intervening years where the assets will be
revalued to their indexed amount if a material change has occurred.
Page 225 of 392

Page 226

97 
Annual Accounts 2025/26 PUBLIC
Note 33: Assumptions made about the future 
The Annual Accounts contains estimated figures that are based on assumptions made by the Council about the
future or that are otherwise uncertain.  Estimates are made taking into account historical experience, current
trends and other relevant factors. However, because balances cannot be determined with certainty, actual results
could be materially different from the assumptions and estimates. The items in the Council’s Balance Sheet as at
31 March 2026 for which there is a significant risk of material adjustment in the forthcoming financial year are as
follows: 
Item Uncertainty Effect if results differ from assumption
Pensions
Liability
Estimation of the net liability to pay pensions
depends on a number of complex judgements
relating to the discount rate used, the rate at
which salaries are projected to increase,
changes in retirement ages, mortality rates and
expected returns on pension fund assets. A firm
of consulting actuaries is engaged to provide the
Council with expert advice about the
assumptions to be applied. The carrying value of
the net pension asset was £865.3m, before the
asset cap, as at 31 March 2026 (asset of
£689.5m as at 31 March 2025). Further detail
can be found in Note 29: Defined Benefit
Pension Schemes.
The effects on the net pension asset of changes
in individual assumptions can be measured. For
instance, a 0.1% decrease in the discount rate
assumption would result in a decrease in the
pension asset of £18.3m. However, the
assumptions interact in complex ways. At 31
March 2026, the Council’s actuaries advised
that (before the asset cap is applied) the net
pensions asset had increased by £9.6m as a
result of estimates being corrected as a result of
experience; increased by £7.3m as a result of
updating demographic assumptions; and
increased by £34.7m as a result of updating
financial assumptions.Property, Plant
and
Equipment
Assets are depreciated over useful lives that are
dependent on assumptions about the level of
repairs and maintenance that will be incurred in
relation to individual assets. The current
economic climate makes it uncertain that the
authority will be able to sustain its current
spending on repairs and maintenance, bringing
into doubt the useful lives assigned to assets.     
If the useful life of assets is reduced,
depreciation increases and the carrying amount
of the asset falls. It is estimated that if the
annual depreciation charge for buildings would
increase by £6.862m for every year that useful
lives had to be reduced.
Page 226 of 392

Page 227

98 
Annual Accounts 2025/26 PUBLIC
Common Good Funds
The Common Good Funds comprise land granted to a Burgh by the Crown; further grants of land and buildings,
mainly in the late 19th and early 20th century by local industrialists and other landowners for the common good of
the inhabitants of the Burgh; and rental income and sale proceeds from such land. The bulk of the Paisley Common
Good was granted to the Burgh of Paisley by the King Charles II Charter, dated 27 and 28 July 1666, and has been
administered by the Burgh and its successors since that date. The bulk of the Renfrew Common Good was granted
to the Royal Burgh of Renfrew by the Queen Anne Charter, dated 7 August 1703, and again has been administered
by the Burgh and its successors since that date.
Income and expenditure statement
Paisley Johnstone Renfrew Total
£m £m £m £m
Expenditure 0.271 0.000 1.097 1.368
Income   (1.763) 0.000 (3.437) (5.200)
(Surplus)/Deficit for the year (1.492) 0.000 (2.340) (3.832)
(Surplus)/Deficit Brought Forward (6.578) (0.052) (36.803) (43.433)
Accumulated (Surplus)/Deficit at 31 March 2025 (8.070) (0.052) (39.143) (47.265)
Income and Expenditure Statement for the Year
Ending 31 March 2026
Paisley Johnstone Renfrew Total
£m £m £m £m
Expenditure 0.247 0.000 0.853 1.100
Income   (0.452) 0.000 (1.476) (1.928)
(Surplus)/Deficit for the year (0.205) 0.000 (0.623) (0.828)
(Surplus)/Deficit Brought Forward (6.373) (0.052) (36.180) (42.605)
Accumulated (Surplus)/Deficit at 31 March 2024 (6.578) (0.052) (36.803) (43.433)
Income and Expenditure Statement for the Year
Ending 31 March 2025 (restated)
During 2024/25, following a review of historical title and legal advice, the Council reclassified £1.090m of property
from Council assets to the Paisley Common Good (£0.285m) and the Renfrew Common Good (£0.805m). The
Income and Expenditure Statement for the year ended 31 March 2025 has been restated to reflect this.
Balance Sheet 
Paisley Johnstone Renfrew Total
£m £m £m £m
Tangible Fixed Assets 1.891 0.000 13.877 15.768
Heritage Assets 0.063 0.046 0.109 0.218
Investments 5.629 0.000 21.591 27.220
Debtors 0.000 0.000 0.024 0.024
Short-term deposits 0.493 0.006 4.004 4.503
Total assets 8.076 0.052 39.605 47.733
Creditors: Amounts Falling Due Within One Year (0.006) 0.000 (0.029) (0.035)
Net Assets 8.070 0.052 39.576 47.698
Income Funds (3.899) (0.036) (22.315) (26.250)
Revaluation reserve: Investments (1.803) 0.000 (6.514) (8.317)
Revaluation reserve: Fixed Assets (2.368) (0.016) (10.747) (13.131)
Total Reserves (8.070) (0.052) (39.576) (47.698)
Balance at 31 March 2026
Page 227 of 392

Page 228

99 
Annual Accounts 2025/26 PUBLIC
Balance at 31 March 2025 Paisley Johnstone Renfrew Total
£m £m £m £m
Tangible Fixed Assets 1.049 0.000 13.915 14.964
Heritage Assets 0.063 0.046 0.109 0.218
Investments 5.019 0.000 19.194 24.213
Debtors 0.000 0.000 0.020 0.020
Short term deposits 0.452 0.006 3.591 4.049
Total assets 6.583 0.052 36.829 43.464
Creditors: Amounts Falling Due Within One Year (0.005) 0.000 (0.026) (0.031)
Net Assets 6.578 0.052 36.803 43.433
Income Funds (3.836) (0.036) (21.923) (25.795)
Revaluation reserve: Investments (1.307) 0.000 (4.602) (5.909)
Revaluation reserve: Other Fixed Assets (1.435) (0.016) (10.278) (11.729)
Total Reserves (6.578) (0.052) (36.803) (43.433) 
Accounting Policies and Note 
Accounting Policies adopted for the Common Good are the same as those adopted for Renfrewshire Council
except for the application of IAS 16. IAS 16 requires that assets be depreciated and that the charge for depreciation
be set against and surplus in the Income and Expenditure account. In addition, IAS 16 requires any decreases in
the value of assets to be recognised in the Income and Expenditure account, unless there is a previous increase in
the value of the asset held in the Revaluation Reserve. Conversely, any increases in the value of assets are to be
recognised in the surplus or deficit in the Income and Expenditure account, to the extent that it reverses a decrease
of the same asset previously recognised in the Income and Expenditure account. 
The Council is required to make arrangements for the proper administration of its financial affairs and to ensure
that one of its officers has the responsibility for the administration of those affairs. The Director of Finance and
Resources has been designated as that officer in Renfrewshire Council. They manage the affairs of the Council to
secure the economic, efficient, and effective use of resources and safeguard its assets and those of any charitable
trust it controls. Given that the Common Good is owned by the Council, these specific provisions are
supplemented by the general provisions relating to the administration of local authority monies, i.e., the duty to
obtain best value. 
Income to the Common Good Funds is solely from investment returns (both financial investments and property
rental income) and bank interest; no donations to the Funds are solicited. The only other source of income, which
arises periodically, is from the sale of fixed assets. 
The investment performance of the Common Good Funds is monitored regularly by Council officers and is reported
bi-annually to the Investment Review Board, which is comprised of five cross-party elected members. The minutes
of the Investment Review Board are submitted to the Finance, Resources and Customer Services Policy Board,
whose meetings are held in public. In turn, the minutes of this Board are submitted to the full Council for
ratification. Therefore, all elected members are kept informed of both the performance of the funds and any
decision regarding the operation of the Funds, which would be made by the Finance, Resources and Customer
Services Policy Board. 
Revaluation adjustments related to investments are included in Income within the CIES and were £0.000m for
Paisley Common Good and £0.023m for Renfrew Common Good.
Page 228 of 392

Page 229

100 
Annual Accounts 2025/26 PUBLIC
Housing Revenue Account 
Income and expenditure statement 
The Housing Revenue Account (HRA) reflects a statutory obligation to maintain a revenue account for local
authority housing provision in accordance with the Housing (Scotland) Act 1987. The Housing Revenue Account
income and expenditure statement shows the economic cost in the year of providing housing services in
accordance with generally accepted accounting practices, rather than the amount to be funded from rents and
government grants. Councils charge rents to cover expenditure in accordance with regulations; this may be
different from the accounting cost. The increase or decrease in the year, on the basis on which rents are raised, is
shown in the movement on the Housing Revenue Account statement. 
2024/25 2025/26
£m £m
22.179 Repairs and maintenance 23.118
15.120 Supervision and management 17.118
32.202 Depreciation and impairment of non-current assets 34.268
(0.058) Increase/(Decrease) in the allowance for bad debts 0.321
3.810 Other expenditure 3.345
73.253 Total Expenditure 78.170
(53.993) Dwelling rents (58.120)
(1.120) Non-dwelling rents (1.183)
(1.808) Other income (2.205)
(56.921) Total Income (61.508)
16.332 Net Cost of HRA services as included in the CIES 16.662
HRA share of the operating income and expenditure included in the CIES:
0.018 (Gain)/Loss on sale of HRA non-current assets 0.160
3.137 Interest payable and similar charges 3.936
(1.850) Interest and investment income (1.102)
1.353 Pensions interest cost and expected return on pensions assets 1.018
(2.112) Taxation and non specific grant income (10.089)
16.878 Deficit for the year on HRA services 10.585
Movement on the Housing Revenue Account statement 
This statement shows the movement in the year on the Housing Revenue Account (HRA) Balance. The surplus or
deficit for the year on the HRA income and expenditure statement represents the true economic cost of providing
the Council’s HRA services, more details of which are shown in the HRA income and expenditure statement itself. 
The adjustments between accounting basis and funding basis under regulations detail the adjustments that are
made to the HRA income and expenditure, as recognised by the Council in the year in accordance with proper
accounting practice, to the statutory amounts required to be charged to the HRA Balance for dwellings rent setting
purposes. An analysis of these adjustments can be found in Note 6: Adjustment between accounting basis and
funding basis under regulation on page 49. 
Page 229 of 392

Page 230

101 
Annual Accounts 2025/26 PUBLIC
2024/25 2025/26
£m £m
(6.164) Balance on the HRA at 1 April (6.933)
16.878 Deficit for the year on the HRA income and expenditure statement 10.585
(2.737) Adjustments between accounting basis and funding basis under statute 5.350
(14.910) Adjustments to Usable Reserves permitted by accounting standards (16.975)
(0.769) Net (Increase)/Decrease before transfers to or from reserves (1.040)
(6.933) Balance on the HRA at 31 March (7.973) 
Notes to the Housing Revenue Account income and expenditure statement 
The number and types of dwelling in the Council’s housing stock 
The Council was responsible for managing 11,942 dwellings during 2025/26 (12,078 in 2024/25). The following
shows an analysis of these dwellings by type. The figures below exclude void initiative properties. 
Number Average weekly rent Type of dwelling Number Average weekly rent
419 £70.22 One-apartment 416 £69.04
3594 £84.83 Two-apartment 3,516 £85.84
5773 £99.00 Three-apartment 5,716 £99.01
2078 £111.22 Four-apartment 2,080 £109.75
214 £120.08 Five-apartment 214 £118.64
12,078 Total 11,942
As at 31 March 2025 As at 31 March 2026
Other information 
Dwellings Non-Dwellings Total as at 31
March 2026
Total as at 31
March 2025
£m £m £m £m
Void Rent Loss 1.697 0.272 1.969 2.461
Rental Income Arrears 3.987 0.581 4.568 4.184
Provision for uncollectable rent arrears 3.205 0.542 3.747 3.568
Corporate and Democratic Core costs 0.046 0.033 
Page 230 of 392

Page 231

102 
Annual Accounts 2025/26 PUBLIC
Council Tax Income Account 
The Council Tax income account shows the gross income raised from Council Taxes levied and deductions made
under statute. Councils raise taxes from residents through Council Tax, which is a tax linked to property values. The
Council Tax Reduction Scheme represents a discount introduced across Scotland following the abolition of
Council Tax Benefits as part of the UK government’s Welfare Reform programme. The resultant net income is
transferred to the Council’s CIES. 
2024/25 2025/26
£m £m
132.893 Gross council tax levied 146.445
(17.658) Other discounts and reductions (19.367)
(13.666) Council tax reduction scheme (15.141)
(3.387) Write-off of uncollectable debts and allowance for impairment (3.622)
(0.481) Adjustment to previous years’ community charge and council tax (0.111)
97.701 Transfer to the Comprehensive Income and Expenditure Statement 108.204 
Calculation of the Council Tax 
Dwellings are valued by the Assessor and placed within valuation bands ranging from the lowest “A” to the highest
“H”. The band D Council Tax charge is calculated using the Council Tax base, and this in turn fixes the charge for
each of the other bands, which are based on pre-determined proportions relative to the band D charge. The band D
charge for 2025/26 was £1,572.61 (£1,436.17 in 2024/25). 
2024/25 2025/26
£ £
957.45 A 1,048.41
1,117.02 B 1,223.14
1,276.60 C 1,397.88
1,436.17 D 1,572.61
1,886.97 E 2,066.23
2,333.78 F 2,555.49
2,812.50 G 3,079.69
3,518.62 H 3,852.89
Council Tax Band
If a property is occupied by only one person over 18, a discount of 25% is applied. 
Since 15 July 2016, unoccupied and unfurnished properties have been exempted from Council Tax for the first six
months.  A discount of 10% is then available for the next six months and 100% additional Council Tax levy is then
payable for as long as the property remains empty, although the 10% discount may be extended by a further 12
months if the property is being actively marketed for sale or let.   
Certain persons are disregarded for Council Tax purposes, including students, people who are in detention and
those who are severely mentally impaired. Reductions in Council Tax are available for people with disabilities.
Page 231 of 392

Page 232

103 
Annual Accounts 2025/26 PUBLIC
Charges for water and sewerage services are the responsibility of Scottish Water. Renfrewshire Council collects
total monies and makes a precept payment to Scottish Water on the basis of collection levels based on a pre-
determined formula. The figures below exclude the water and sewerage charges.
Calculation of the Council Tax base
The Council Tax base is the number of chargeable dwellings across all valuation bands (adjusted for dwellings
where discounts apply), after providing for non-payment, expressed as an equivalent number of band D dwellings. 
Band
Number of
dwellings
Number of
exemptions
Disabled
relief Discounts
Council Tax
Reduction
Total
equivalent
dwellings
Ratio to
Band D
2025/26
Band D
equivalent
2024/25
Band D
equivalent
A 13,115 1,923 6 1,900 3,359 5,983 0.67 3,988 3,857
B 25,860 1,641 56 3,344 5,198 15,676 0.78 12,192 11,958
C 15,519 572 55 1,675 1,965 11,298 0.89 10,043 9,923
D 13,895 319 46 1,327 754 11,537 1.00 11,537 11,258
E 11,808 203 88 786 406 10,386 1.31 13,646 13,465
F 7,280 87 61 329 123 6,696 1.62 10,881 10,779
G 4,619 97 16 159 55 4,293 1.96 8,407 8,182
H 199 8 1 9 2 179 2.45 439 456
92,295 Band A dwellings subject to disabled relief 6 6
Class 17 and 24 dwellings 65 70
Sub-total 71,204 69,954
Less: Provision for non-payment and future award of discounts and reliefs (2,401) (2,098)
Council Tax Base 68,803 67,856 
Page 232 of 392

Page 233

104 
Annual Accounts 2025/26 PUBLIC
Non-Domestic Rates Income Account
This account is an agent’s statement that reflects the statutory obligation for those councils who issue bills to non-
domestic rate payers to maintain a separate non-domestic rate account. The account shows the rates collected
from non-domestic rate payers during the year. Any difference between the rates collected and the amount the
Council is guaranteed to receive under the national pooling arrangements is adjusted via the Scottish
Government's general revenue grant to the Council. Non-domestic rate income is redistributed from the national
non-domestic rate pool in proportions based on the prior year mid-year income returns net of prior year
adjustments. In 2012/13 the Scottish Government introduced the Business Rates Incentivisation Scheme (BRIS)
which allows councils, where an agreed target income figure is exceeded, to retain 50% of the ‘above target’
income.
2024/25 2025/26
£m £m
146.060 Gross rates levied 142.990
(26.998) Reliefs and other deductions (29.712)
(1.840) Write-off of uncollectable debts and allowance for impairment (1.734)
117.222 Net Non-Domestic Rates income 111.544
(10.047) Adjustment to previous years’ non-domestic rates (9.819)
0.330 Contribution (to)/from the National Non-Domestic Rate pool 7.119
107.505 Transfer to the Comprehensive Income and Expenditure Statement 108.844
The nature and amount of each rate fixed
The non-domestic rates charge for each subject is determined by the rateable value placed upon it by the
Assessor, multiplied by the rate per pound (the “rate poundage”) set each year by the Scottish Government. For
2025/26 the charge was 49.8 pence in the pound, with a 5.6 pence supplement for properties with a rateable value
over £51,000 and a 7.0 pence supplement for properties with a rateable value above £100,000. 
Analysis of Renfrewshire Council’s rateable values 
2025/26
£m
90.538
54.879
30.095
1.989
90.866
268.367
(8.202)
260.165
(1.558)
258.607Net Rateable Value at 31 March
Analysis of Rateable Values
Commercial
Industrial and freight transport
Education and public service
Communications
Others
Rateable Value at 1 April 
Adjustments (Full Year Rateable Value)
Less: Wholly Exempt Subjects
Rateable Value at 31 March
Page 233 of 392

Page 234

105 
Annual Accounts 2025/26 PUBLIC
Group Accounts
Group Comprehensive Income and Expenditure Statement
This statement shows the accounting cost of providing services and managing operations during the year. It
includes, on an accruals basis, all day-to-day expenses and related income. The statement shows the accounting
cost in accordance with generally accepted accounting practices, rather than the cost according to the statutory
regulations that specify the net expenditure that councils need to take into account when setting the annual
Council Tax charge. The required adjustments between accounting basis and funding basis under regulations are
shown in the group movement in reserves statement. 
Council PPE
(Note 9)
Council
share of
Group PPE
Total
Group PPE
£m £m £m
Balance sheet net carrying amount at 31 March 2024 1,858.221 15.748 1,873.969
Assets reclassified (to) or from the “held for sale” category (2.492) 0.000 (2.492)
Other asset reclassifications (1.090) 1.090 0.000
Recognition of Right of Use Assets and Increase in PPP liability 20.795 0.000 20.795
Additions 119.440 0.352 119.792
Disposals (1.823) 0.000 (1.823)
Depreciation (96.776) (0.593) (97.369)
Impairment adjustments recognised in the CIES (2.934) 0.000 (2.934)
Revaluation adjustments taken to the Revaluation Reserve 86.293 0.000 86.293
Revaluation adjustments recognised in the CIES (24.633) 0.000 (24.633)
Balance sheet net carrying amount at 31 March 2025 1,955.001 16.597 1,971.598
Gross carrying amount at 31 March 2025 1,893.3100 21.5900 1,914.900
Accumulated depreciation at 31 March 2025 (173.7850) (4.9930) (178.778)
Infrastructure assets 235.476 0.000 235.476
Balance sheet net carrying amount at 31 March 2025 1,955.001 16.597 1,971.598
Movements in 2024/25 (restated)
Figures shown in brackets represent income or gains and figures without brackets represent expenditure or losses. 
Page 234 of 392

Page 235

106 
PUBLIC
Group Movement in Reserves Statement
The group movement in reserves statement shows the movement in the year on the different reserves held by the
Council's group, analysed into the Council's usable reserves, the Council's unusable reserves and the Council's
share of the reserves of the subsidiaries, associates, and joint ventures within the group.
2025/26 Council’s
Usable
Reserves
Council’s
Unusable
Reserves
Council’s
Total
Reserves
Council’s share
of Reserves of
Subsidiaries,
Associates and
Joint Ventures
Total
Reserves
Note £m £m £m £m £m
Balance at 1 April 2025 235.197 1,320.054 1,555.251 105.140 1,660.391
Movement in reserves during the year
Total Comprehensive Income and
Expenditure
(5.332) 236.480 231.148 (3.314) 227.834
Adjustments between Group
accounts and Council accounts
G5 (15.296) 0.000 (15.296) 15.296 0.000
Adjustments to Usable Reserves
permitted by accounting standards
7 39.143 (39.143) 0.000 0.000 0.000
Adjustment for Service Concession
Arrangements
2.047 (2.047) 0.000 0.000 0.000
Adjustments between accounting
basis and funding basis under
regulations
6 (18.345) 18.345 0.000 0.000 0.000
Increase / (Decrease) in year 2.217 213.635 215.852 11.982 227.834
Balance at 31 March 2026 237.414 1,533.689 1,771.103 117.122 1,888.225
Comparative movements in 2024/25
(restated)
Council’s
Usable
Reserves
Council’s
Unusable
Reserves
Council’s
Total
Reserves
Council’s share
of Reserves of
Subsidiaries,
Associates and
Joint Ventures
Total
Reserves
Note £m £m £m £m £m
Balance at 1 April 2024 222.219 1,302.617 1,524.836 99.413 1,624.249
Movement in reserves during the year
Total Comprehensive Income and
Expenditure
(70.981) 117.355 46.374 (10.232) 36.142
Adjustments between Group
accounts and Council accounts
G5 (15.959) 0.000 (15.959) 15.959 0.000
Adjustments to Usable Reserves
permitted by accounting standards
39.114 (39.114) 0.000 0.000 0.000
Adjustment for Service Concession
Arrangements
13.901 (13.901) 0.000 0.000 0.000
Adjustments between accounting
basis and funding basis under
regulations
6 46.903 (46.903) 0.000 0.000 0.000
Increase / (Decrease) in year 12.978 17.437 30.415 5.727 36.142
Balance at 31 March 2025 235.197 1,320.054 1,555.251 105.140 1,660.391
Page 235 of 392

Page 236

107 
PUBLIC
Group Balance Sheet
The group balance sheet shows the value as at 31 March 2026 of the assets and liabilities recognised by the
Council. The net assets of the Council’s group are matched by the reserves held by the group. Reserves are
reported in two categories: usable reserves, which are those reserves that the group may use to provide services,
subject to the need to maintain a prudent level of reserves and any statutory limitations; and unusable reserves,
comprising those that the group is not able to use to provide services. This category includes reserves that hold
unrealised gains/losses in the value of assets where amounts would only become available to provide services if
the assets are sold, and reserves that hold timing differences shown as ‘adjustments between accounting basis
and funding basis under regulations’ in the group movement in reserves statement.
As at 31 March
2025 (restated)
As at 31 March
2026
£m Note £m
1,971.599 Property, plant and equipment G10 2,239.421
44.404 Heritage assets G11 44.404
0.409 Investment property G9 0.403
1.189 Intangible assets 12 0.690
28.604 Long-term investments G15 31.927
57.358 Investments in associates and joint ventures G3 63.785
2.002 Long-term debtors G15 1.820
2,105.565 2,382.450
2.492 Assets held for sale 11 0.000
17.534 Short-term investments G15 24.623
1.120 Inventories 1.221
62.985 Short-term debtors G12 77.270
7.514 Cash and cash equivalents G15 42.991
91.645 146.105
(85.804) Short-term borrowing G15 (68.642)
(70.047) Short-term creditors G13 (111.748)
(0.406) Short-term provisions 20 (0.567)
(156.257) (180.957)
(77.581) Long-term creditors 19 (73.551)
(5.230) Long-term provisions 20 (6.786)
(232.050) Long-term borrowing G15 (314.756)
(0.023) Liabilities in associates and joint ventures G3 (0.048)
(65.678) Other long-term liabilities (64.232) 
(380.562) (459.373) Alastair MacArthur
1,660.391 1,888.225
(265.762) Usable reserves G7 (269.253)
(1,394.629) Unusable reserves G8 (1,618.972)
(1,660.391) (1,888.225)
Director of Finance
and Resources
Total reserves
Long-term assets
Current assets
Current liabilities
Long-term liabilities
Net assets
The unaudited accounts were issued on 22 June 2026 and the audited accounts were authorised for issue on 24
September 2026.
Page 236 of 392

Page 237

108 
PUBLIC
Group Cashflow Statement 
The group cash flow statement shows the changes in cash and cash equivalents of the Council’s group during the
year. It shows how the Council generates and uses cash and cash equivalents by classifying cash flows as
operating, investing and financing activities. The amount of net cash flows arising from operating activities is a key
indicator of the extent to which the operations of the Council are funded by way of taxation and grant income or
from the recipients of services provided by the Council. Investing activities represent the extent to which cash
outflows have been made for resources that are intended to contribute to the Council’s future service delivery.
Cash flows arising from financing activities are useful in predicting claims on future cash flows by providers of
capital (that is, borrowing) to the Council. The Council’s share of the cash flows of its associates and joint ventures
is disregarded for the purpose of this statement because the Council’s share of the associates’ and joint ventures’
reserves is unusable and cannot be used to fund services. 
2024/25 2025/26
£m £m
(83.848) Group surplus/(deficit) (13.094)
140.324 Adjustment for non-cash movements 155.469
(25.010) Adjustments for items included in the group surplus/deficit that are investing and
financing activities
(55.032)
31.466 Net cash flows from operating activities 87.343
(48.008) Net cash flows from investing activities (111.383)
(7.365) Net cash flows from financing activities 59.516
(23.907) Net increase/(decrease) in cash and cash equivalents 35.476
31.422 Cash and cash equivalents at the beginning of the reporting period 7.515
7.515 Cash and cash equivalents at the end of the reporting period 42.991 
Notes to the Group Accounts 
The Council’s share of Group entities is reviewed on an annual basis and some prior year figures are adjusted as a
result, when compared to the prior year audited accounts. The impact was an increase in net assets of £0.012m. 
Note G1: Details of the group’s combining entities 
Renfrewshire Council is represented on the board of a number of organisations. The extent of the Council interest
has been reviewed in determining those entities that should be consolidated and incorporated within the group
accounts. Those organisations, which have a significant impact on the Council’s operations, are listed below. The
accounting period for all of these bodies is the year to 31 March 2026. In addition to the information included in the
group accounts on the preceding pages the accounting regulations require specific disclosures about the
combining entities and the nature of their business.
OneRen, the Paisley, Renfrew and Johnstone Common Good Funds, Paisley Museum Reimagined Limited, Park
Lane Developments (Renfrewshire) LLP and the Coats Observatory Trust administered by Renfrewshire Council (as
sole trustee) are treated as subsidiaries in the Council’s group accounts, with assets, liabilities, reserves, income
and expenses being consolidated line-by-line. AMIDS (Renfrewshire) LLP is a joint venture arrangement. 
Page 237 of 392

Page 238

109 
PUBLIC
Renfrewshire Leisure Limited, trading as OneRen, is a company limited by guarantee formed in 2014 and
registered as a charity in Scotland. Its principal place of business is the Lagoon Leisure Centre, 11 Christie Street,
Paisley PA1 1NB. The charity provides leisure and culture facilities within Renfrewshire Council’s area to the
general public and operates ten leisure centres within Renfrewshire plus a range of cultural service buildings,
libraries and community halls. The objectives of the charity are to provide facilities for recreation, sport, cultural
and other leisure activities for the benefit of the community in Renfrewshire. Any surplus generated by the charity is
applied solely to its continuation and development. The accounts of the charity are published separately and may
be obtained from the Chief Executive, OneRen, Lagoon Leisure Centre, 11 Christie Street, Paisley PA1 1NB. 
The group comprehensive income and expenditure statement (CIES) includes total net comprehensive income
for the year of £0.740m (2024/25 £1.144m restated) for OneRen, total net comprehensive income for the year of
£4.266m (2024/25 £0.830m restated) for the Paisley, Renfrew and Johnstone Common Good Funds, total net
comprehensive expenditure for the year of £0.027m (2024/25 net comprehensive income of £0.227m) for Park Lane
Developments (Renfrewshire) LLP, total net comprehensive income for the year of £0.070m (2024/25 £0.045m
restated) for Paisley Museum Reimagined Limited and total net comprehensive income for the year of £0.523m
(2024/25 £0.352m restated) for the Coats Observatory Trust.
The group balance sheet includes net assets of £1.937m (2024/25 £1.197m restated) for OneRen, net assets of
£47.698m (2024/25 £43.433m restated) for the Common Good Funds, net assets of £0.094m (2024/25 £0.121m)
for Park Lane Developments (Renfrewshire) LLP, net assets of £1.287m (2024/25 £1.209m restated) for Paisley
Museum Reimagined Limited and net assets of £2.369m (2024/25 £1.845m) for the Coats Observatory Trust. 
Strathclyde Concessionary Travel Scheme Joint Committee comprises the twelve councils in the west of
Scotland and oversees the operation of the concessionary fares scheme for public transport within its area. The
costs of the scheme are met by a combination of funding from the twelve constituent councils and by direct grant
funding from the Scottish Government. Strathclyde Partnership for Transport administers the scheme on behalf of
the committee. In 2025/26, Renfrewshire Council contributed £0.341m or 8.16% of the committee’s estimated
running costs (2024/25 £0.332m or 8.11%) and its share of the year-end net asset was £0.374m (2024/25 £0.303m)
and is included in the group balance sheet. Copies of its accounts may be obtained from the Treasurer to
Strathclyde Concessionary Travel Scheme, Strathclyde Partnership for Transport, 131 St. Vincent Street, Glasgow
G2 5JF. 
Strathclyde Partnership for Transport was formed on 1 April 2006 as the successor to the Strathclyde Passenger
Transport Authority. It is a joint committee of the twelve councils in the west of Scotland. In association with the
related strategic development committees, the partnership’s remit includes the promotion of joint working to set
out the policy framework for achieving the most effective management, development and integration of the
transport network across boundaries in the medium to longer term through the Regional Transport Strategy.
Renfrewshire Council contributed £3.031m or 8.26% to the committee’s estimated running costs in 2025/26
(2024/25 £2.955m or 8.22%) and its share of the year-end net asset was £48.100m (2024/25 £44.072m) and is
included in the group balance sheet. Copies of its accounts may be obtained from the Treasurer to Strathclyde
Partnership for Transport, 131 St. Vincent Street, Glasgow G2 5JF. 
Page 238 of 392

Page 239

110 
PUBLIC
Strathclyde
Partnership for
Transport
Renfrewshire
Council’s Share
Strathclyde
Partnership for
Transport
Renfrewshire
Council’s Share
£m £m £m £m
Balance Sheet Summary
367.769 30.227 Long-term assets 403.546 33.339
186.984 15.369 Current assets 217.896 18.002
(16.326) (1.342) Current liabilities (37.182) (3.072)
(2.213) (0.182) Long-term liabilities (2.051) (0.169)
536.214 44.072 Net assets 582.209 48.100
Income and Expenditure Summary
115.145 9.464 Income 122.303 10.104
83.326 6.849 less: Expenditure 89.846 7.423
31.819 2.615 Surplus for the year 32.457 2.681
As at 31 March 2025 As at 31 March 2026
2024/25 2025/26
Renfrewshire Valuation Joint Board was formed in 1996 at local government re-organisation by Act of Parliament.
Its principal place of business is Renfrewshire House, Cotton Street, Paisley PA1 1BF. The board maintains the
electoral, council tax and non-domestic rates registers for the three councils of East Renfrewshire, Inverclyde and
Renfrewshire. The board’s running costs are met by the three member councils. Surpluses or deficits on the board’s
operations are shared between the councils. In 2025/26, Renfrewshire Council contributed £1.644m or 57.5% of
the board’s estimated running costs (2024/25 £1.6m or 57.7%) and its share of the year-end net asset was £1.084m
(2024/25 £0.903m restated) and is included in the group balance sheet. Copies of its accounts may be obtained
from the Treasurer to the Renfrewshire Valuation Joint Board, Renfrewshire Council, Renfrewshire House, Paisley
PA1 1JB. The following additional disclosures are required under accounting regulations for Renfrewshire Valuation
Joint Board because it is a related party to the Council. 
Renfrewshire
Valuation Joint
Board
Renfrewshire
Council’s Share
Renfrewshire
Valuation Joint
Board
Renfrewshire
Council’s Share
£m £m £m £m
Balance Sheet Summary
0.167 0.097 Long-term assets 0.725 0.417
1.543 0.890 Current assets 1.551 0.891
(0.098) (0.057) Current liabilities (0.184) (0.106)
(0.046) (0.027) Long-term liabilities (0.206) (0.118)
1.565 0.903 Net assets 1.886 1.084
Income and Expenditure Summary
3.205 1.848 Income 3.426 1.969
2.827 1.630 less: Expenditure 3.122 1.795
0.378 0.218 Deficit for the year 0.303 0.174
As at 31 March 2025 (restated) As at 31 March 2026
2024/25 (restated) 2025/26
The Public Bodies (Joint Working) (Scotland) Act 2014 established the framework for the integration of health and
adult social care in Scotland. On 27 June 2015, Scottish Ministers legally established the Renfrewshire Health and
Social Care Integration Joint Board (IJB) as a formal legal partnership between Renfrewshire Council and NHS
Greater Glasgow and Clyde. 
Page 239 of 392

Page 240

111 
PUBLIC
The IJB is responsible for the strategic planning of the functions delegated to it and for ensuring the delivery of its
functions through the locally agreed operational arrangements. Copies of the financial statements for the IJB may
be obtained from Chief Officer, Renfrewshire Health and Social Care Integration Joint Board, Renfrewshire House,
Cotton Street, Paisley, PA1 1WB. 
Renfrewshire
Integration Joint
Board
Renfrewshire
Council’s Share
Renfrewshire
Integration Joint
Board
Renfrewshire
Council’s Share
£m £m £m £m
Balance Sheet Summary
24.159 12.080 Current assets 28.454 14.227
24.159 12.080 Net assets 28.454 14.227
Income and Expenditure Summary
419.678 209.839 Income 443.270 221.635
421.595 210.797 less: Expenditure 438.976 219.488
(1.917) (0.958) (Deficit)/Surplus for the year 4.294 2.147
As at 31 March 2025 As at 31 March 2026
2024/25 2025/26
Note G2: Non-material interest in other entities 
In addition to the combining entities detailed in note G1, the Council has a “significant interest” in a number of joint
committees. The Council’s share of the net assets or liabilities of these joint committees is not material to the fair
understanding of the financial position and transactions of the Council. Accordingly, the group accounts do not
include these organisations. In the interest of transparency, the following disclosures are made concerning the
business nature of each organisation. 
Scotland Excel is formed by agreement among local authorities throughout Scotland and is maintained through a
joint committee comprising representatives from all of the member councils. Launched on 1 April 2008 as a centre
of procurement expertise for the local government sector, it is the largest non-profit making purchasing agency in
Scotland. Its aim is to help improve the efficiency and effectiveness of public sector procurement. Renfrewshire
Council contributed £0.130m (3.3%) to the committee’s estimated running costs in 2025/26 (£0.130m in 2024/25). 
Glasgow and the Clyde Valley Strategic Development Planning Authority was dissolved on 31 March 2025 and
all activities transferred to the Glasgow City Region City Deal Cabinet. Under the Town and Country Planning
(Scotland) Act 1997, eight member councils had responsibilities not only for local planning matters within their
own boundaries but also for strategic issues affecting the wider Glasgow and Clyde Valley area. The committee
was responsible for preparing, monitoring and reviewing the Strategic Development Plan on behalf of the member
councils and for liaising with central government, Scottish Enterprise and other bodies. No contribution was
required from Renfrewshire Council in 2025/26. In 2024/25 the contribution was £0.053m (12.5%) to the
committee’s estimated running costs. 
Glasgow City Region – City Deal Cabinet is a Joint Committee, the purpose of which is to determine the Strategic
Development priorities for the Clyde Valley Region and to monitor and ensure the delivery of the City Deal
programme as agreed between member authorities and the UK and Scottish Governments. The City Deal
programme aims to deliver a £1.13 billion investment programme through 20 infrastructure projects and will drive
innovation and growth through the support of the key sectors, including delivery of labour market and innovation
programmes. The committee operates in an administrative / project management capacity and does not hold any
Page 240 of 392

Page 241

112 
PUBLIC
assets or liabilities developed from the City Deal programme. Renfrewshire Council contributed £0.037m (10%) to
the committee’s estimated running costs in 2025/26 (£0.031m (9.7%) in 2024/25). 
Note G3: Associates and joint ventures 
The aggregate value of the assets, liabilities, income and expenditure of the Council’s associates and joint ventures
are shown in the two tables which follow. The net asset figure from these two tables combined (£14.179m +
£49.558m = £63.737m) equates to the net of the two figures disclosed in the group balance sheet as ‘Investments
in associates and joint ventures’ (£63.785m) and ‘Liabilities in associates and joint ventures’ (£0.048m). 
Aggregate of Joint
Venture results
Renfrewshire
Council’s Share
Aggregate of Joint
Venture results
Renfrewshire
Council’s Share
£m £m £m £m
Balance Sheet Summary
24.629 12.315 Current assets 29.168 14.584
(0.032) (0.016) Current liabilities (0.150) (0.075)
(0.484) (0.242) Long-term liabilities (0.660) (0.330)
24.113 12.057 Net assets 28.358 14.179
Income and Expenditure Summary
419.786 209.893 Income 443.432 221.717
421.738 210.869 less: Expenditure 439.187 219.595
(1.952) (0.976) (Deficit)/Surplus for the year 4.245 2.122
As at 31 March 2025 As at 31 March 2026
2024/25 2025/26
Joint ventures
Aggregate of
Associate results
Renfrewshire
Council’s Share
Aggregate of
Associate results
Renfrewshire
Council’s Share
£m £m £m £m
Balance Sheet Summary
367.936 30.324 Long-term assets 404.271 33.756
193.187 16.636 Current assets 224.313 19.29
(17.348) (1.473) Current liabilities (37.652) (3.201)
(2.259) (0.209) Pension asset / (liability) (2.257) (0.287)
541.516 45.278 Net assets 588.675 49.558
Income and Expenditure Summary
122.728 11.667 Income 130.103 12.43
91.994 8.953 less: Expenditure 96.498 9.506
30.734 2.714 Surplus for the year 33.605 2.924
As at 31 March 2025 (restated) As at 31 March 2026
2024/25 (restated) 2025/26
Associates
Note on contingent assets, contingent liabilities and capital commitments 
The Council is unaware of any material contingent asset or contingent liability as at 31 March 2026 in relation to
any of its associates or joint ventures. The Council is unaware that any commitments have been entered into by any
of its associates or joint ventures as at 31 March 2026, either with the Council itself or with other parties.
Page 241 of 392

Page 242

113 
PUBLIC
Note G4: Material items of group income and expenditure 
In order to assist the reader in a better understanding of the impact of the inclusion of the results of the associates
and joint ventures, the following tables provide an analysis of the Council’s share of the material amounts of
income and expenditure disclosed in the group CIES. 
2024/25
(restated)
2025/26
£m £m
Share of (surplus) or deficit:
(1.354) Subsidiaries: (2.488)
(0.798) Paisley, Renfrew and Johnstone Common Good Funds (1.858)
(0.352) Coats Observatory Trust (0.523)
0.068 OneRen (0.056)
(0.227) Park Lane Developments (Renfrewshire) LLP 0.027
(0.045) Paisley Museum Reimagined Limited (0.078)
(2.714) Associates: (2.924)
(2.615) Strathclyde Partnership for Transport (2.681)
0.119 Strathclyde Concessionary Travel Scheme Joint Committee (0.069)
(0.218) Renfrewshire Valuation Joint Board (0.174)
Joint Venture:
0.958 Renfrewshire Health and Social Care Integration Joint Board (2.147)
0.018 AMIDS (Renfrewshire) LLP 0.025
(3.092) Aggregate share of (surplus) or deficit (7.534)
Share of other comprehensive (income) and expenditure:
(1.242) Subsidiaries: (3.092)
(0.030) Paisley, Renfrew and Johnstone Common Good Funds (2.408)
(1.212) OneRen (0.684)
(1.393) Associates: (1.356)
(1.273) Strathclyde Partnership for Transport (1.347)
(0.005) Strathclyde Concessionary Travel Scheme Joint Committee (0.002)
(0.115) Renfrewshire Valuation Joint Board (0.007)
(2.635) Aggregate share of other comprehensive (income) and expenditure (4.448)
(5.727) Aggregate share of total comprehensive (income) and expenditure (11.982)
Material items of group income and expenditure
Note G5: Adjustments between group accounts and council accounts 
In the group movement in reserves statement, adjustments between group accounts and council accounts are
required to bring the Council’s reserve balances back to the amount presented in the Council-only figures (before
adjustments between accounting basis and funding basis under regulations). This is because intra-group
transactions are eliminated when total comprehensive income and expenditure is calculated for the group. The
adjustments between group accounts and council accounts can be analysed as follows:
Page 242 of 392

Page 243

114 
PUBLIC
2024/25 2025/26
£m £m
0.168 Grants made by the Paisley, Renfrew and Johnstone Common Good Funds to
Renfrewshire Council in contribution towards the funding of community events
and projects
0.230
0.059 Governance costs charged to the Paisley, Renfrew and Johnstone Common Good
Funds by Renfrewshire Council
0.059
(0.186) Interest income received from Renfrewshire Council by the Paisley, Renfrew and
Johnstone Common Good Funds
(0.173)
(16.654) Service charge and other expenditure payable by Renfrewshire Council to OneRen (15.762)
0.631 Expenditure payable by OneRen to Renfrewshire Council 0.373
0.023 Expenditure/(income) payable by/(to) Paisley Museum Reimagined Limited to/(by)
Renfrewshire Council
(0.023)
(15.959) Total adjustments between Group accounts and Council accounts (15.296)
Adjustments between Group accounts and Council accounts
Note G6: Group financing and investment income and expenditure
2024/25
(restated) 2025/26
£m £m
21.607 Interest payable and similar charges 21.537
4.014 Net interest on the net defined benefit liability 4.029
(5.762) Interest receivable and similar income (2.803)
(1.404) Income and expenditure in relation to investment properties and changes in their
fair values
0.006
(0.308) Other investment income (3.059)
18.147 Total financing and investment income and expenditure 19.710
Group financing and investment income and expenditure
Note G7: Group Usable reserves
2024/25
(restated) 2025/26
£m £m
(235.195) Council Usable Reserves - Note 7 (237.414)
Group Usable Reserves:
(25.794) Paisley, Renfrew and Johnstone Common Good Funds: unrestricted funds (26.250)
(1.637) OneRen (2.375)
(1.209) Paisley Museum Reimagined Limited (1.287)
(1.927) Renfrewshire Health and Social Care Integration Joint Board (1.927)
(265.762) Total Group Usable Reserves (269.253)
Group Usable Reserves
Page 243 of 392

Page 244

115 
PUBLIC
Note G8: Group Unusable reserves
Unusable reserves are those reserves that the Council is not able to utilise to provide services. Included within the
total Group Unusable Reserves are the unusable reserves of the Council’s subsidiaries; also included is the
Council’s share of the reserves of the associates and joint ventures within the group. 
2024/25
(restated)
2025/26
£m £m
(1,320.056) Council Unusable Reserves - Note 8 (1,533.689)
Group Unusable Reserves:
(5.909) Paisley, Renfrew and Johnstone Common Good Funds: financial instruments
revaluation reserve
(8.316)
(11.730) Paisley, Renfrew and Johnstone Common Good Funds: revaluation reserve (13.132)
(1.845) Coats Observatory Trust: revaluation reserve (2.369)
0.440 OneRen: pension reserve 0.438
(0.121) Park Lane Developments (Renfrewshire) LLP (0.094)
Council share of the Reserves of associates and joint ventures:
(44.072) Strathclyde Partnership for Transport (48.100)
(0.303) Strathclyde Concessionary Travel Scheme Joint Committee (0.374)
(0.903) Renfrewshire Valuation Joint Board (1.084)
(10.153) Renfrewshire Health and Social Care Integration Joint Board (12.300)
0.023 AMIDS (Renfrewshire) LLP 0.048
(1,394.629) Total Group Unusable Reserves (1,618.972)
Group Unusable Reserves
Note G9: Group investment properties
The following items of income and expense have been accounted for in the ‘Financing and investment income and
expenditure’ line in the group CIES:
2024/25 2025/26
£m £m
(0.315) Rental income from investment property (0.088)
(0.315) Net (gain) or loss (0.088)
Group Investment Properties
There are no restrictions on the Council’s ability to realise the value inherent in investment property, nor on the
right to the remittance of income and the proceeds of disposal. With regards Common Good properties, the
Council is obliged to observe the provisions of the Community Empowerment (Scotland) Act 2015 in terms of
public consultation on disposal proposals; however, the right to the remittance of income and proceeds of
disposal remains with the Common Good Funds. The following table summarises the movement in the fair value of
investment properties during the year:
2024/25 2025/26
£m £m
0.415 Balance at 1 April 0.409
(0.006) Fair value changes (0.006)
0.409 Balance at 31 March 0.403
Group Investment Properties
Page 244 of 392

Page 245

116 
PUBLIC
Note G10: Group Property, plant and equipment 
Council PPE
(Note 9)
Council
share of
Group PPE
Total
Group PPE
£m £m £m
Balance sheet net carrying amount at 31 March 2025 1,955.001 16.597 1,971.598
Additions 155.105 0.693 155.798
Disposals (4.294) 0.000 (4.294)
Depreciation (96.451) (0.073) (96.524)
Revaluation adjustments taken to the Revaluation Reserve 221.173 0.827 222.000
Revaluation adjustments recognised in the CIES (9.157) 0.000 (9.157)
Balance sheet net carrying amount at 31 March 2026 2,221.377 18.044 2,239.421
Gross carrying amount at 31 March 2026 2,056.559 23.112 2,079.671
Accumulated depreciation at 31 March 2026 (182.639) (5.068) (187.707)
Infrastructure assets 347.457 0.000 347.457
Balance sheet net carrying amount at 31 March 2026 2,221.377 18.044 2,239.421
Movements in 2025/26
Council PPE
(Note 9)
Council
share of
Group PPE
Total
Group PPE
£m £m £m
Balance sheet net carrying amount at 31 March 2024 1,858.221 15.748 1,873.969
Assets reclassified (to) or from the “held for sale” category (2.492) 0.000 (2.492)
Other asset reclassifications (1.090) 1.090 0.000
Recognition of Right of Use Assets and Increase in PPP liability 20.795 0.000 20.795
Additions 119.440 0.352 119.792
Disposals (1.823) 0.000 (1.823)
Depreciation (96.776) (0.593) (97.369)
Impairment adjustments recognised in the CIES (2.934) 0.000 (2.934)
Revaluation adjustments taken to the Revaluation Reserve 86.293 0.000 86.293
Revaluation adjustments recognised in the CIES (24.633) 0.000 (24.633)
Balance sheet net carrying amount at 31 March 2025 1,955.001 16.597 1,971.598
Gross carrying amount at 31 March 2025 1,893.3100 21.5900 1,914.900
Accumulated depreciation at 31 March 2025 (173.7850) (4.9930) (178.778)
Infrastructure assets 235.476 0.000 235.476
Balance sheet net carrying amount at 31 March 2025 1,955.001 16.597 1,971.598
Movements in 2024/25 (restated)
Page 245 of 392

Page 246

117 
Annual Accounts 2024/25 PUBLIC
Note G11: Group heritage assets 
A valuation of the fair value of the Council’s Heritage
Assets was carried out by an external valuer between
October 2021 and March 2022, resulting in an
increase of £4.883m. The value at 31 March 2026 was
£44.404m (£44.404m in 2024/25). Included in this
value are the civic regalia and equipment of the
Paisley, Renfrew and Johnstone Common Good
Funds, which have been externally valued on a
present value insurance basis at £0.218m as at 31
March 2026 (£0.218 at 31 March 2025). 
Note G12: Group short-term debtors 
The balances detailed below are composed mostly of
the debtors of the Council, to which the debtors of
OneRen, Park Lane Developments (Renfrewshire) LLP
and the Paisley, Renfrew and Johnstone Common
Good Funds have been added. 
As at 31
March
2025
(restated)
As at 31
March
2026
£m £m
7.148 Trade receivables 8.364
6.471 Prepayments 5.229
49.366 Other receivables 63.677
62.985 Total 77.270
Group Short-term
Debtors
Note G13: Group short-term creditors 
The balances detailed below are composed mostly of
the creditors of the Council, to which the creditors of
OneRen, Park Lane Developments (Renfrewshire) LLP
and the Paisley, Renfrew and Johnstone Common
Good Funds have been added. 
As at 31
March
2025
(restated)
As at 31
March
2026
£m £m
(14.078) Trade payables (31.470)
(55.969) Other payables (80.278)
(70.047) Total (111.748)
Group Short-term Creditors
Note G14: Amounts due between
Renfrewshire Council and its associates
and joint ventures 
An analysis of the amounts owing and owed between
the Council and its associates and joint ventures,
analysed into amounts relating to loans and amounts
relating to other balances, is shown in the table
below. 
As at 31
March 2025
As at 31
March 2026
£m £m
Amounts owing to Renfrewshire Council:
0.309 Other balances 0.551
0.309 Total 0.551
Amounts owed by Renfrewshire Council:
(24.186) Liability for Renfrewshire Integration Joint Board’s retained underspend (28.480)
(1.801) Other balances (1.520)
(25.987) Total (30.000)  
Page 246 of 392

Page 247

118 
Annual Accounts 2024/25 PUBLIC
Note G15: Group financial instruments
Balance sheet carrying amounts of group financial instruments
The following categories of financial instrument are carried in the group balance sheet. Additional qualitative
information on the various categories of financial instruments can be found in Note 21: Financial Instruments.
Long-term Current Long-term Current
£m £m £m £m
(232.050) (5.000) (294.432) (0.002)
0.000 (2.694) 0.000 (3.110)
(232.050) (7.694) (294.432) (3.112)
0.000 (46.766) (20.000) (26.766)
0.000 (0.858) 0.000 (0.857)
0.000 (0.588) (0.324) (0.251)
0.000 (48.212) (20.324) (27.874)
0.000 (29.898) 0.000 (38.089)
(232.050) (85.804) (314.756) (69.075)
0.000 (32.506) 0.000 (72.705)
(76.100) (4.775) (72.136) (4.968)
(0.395) 0.000 (0.260) 0.000
(76.495) (37.281) (72.396) (77.673)
Service concession and finance lease liabilities
Financial guarantees
Financial Liabilities included in Creditors
As at 31 March 2025
(restated) Financial Liabilities
At amortised cost: Trade payables
Principal sum borrowed
Accrued interest
Total Public Works Loan Board (PWLB) borrowing
Principal sum borrowed
Accrued interest
EIR adjustments
Total non-PWLB borrowing (“market debt”)
Borrowing from group entities
Total Borrowing
As at 31 March 2026
Long-term Current Long-term Current
£m £m £m £m
0.000 17.521 0.000 24.589
0.000 0.017 0.000 0.039
0.000 (0.004) 0.000 (0.005)
28.604 0.000 31.927 0.000
28.604 17.534 31.927 24.623
0.000 (6.155) 0.000 7.094
0.000 0.029 0.000 0.025
0.000 (0.003) 0.000 (0.003)
0.000 13.644 0.000 35.876
0.000 7.515 0.000 42.992
5.959 70.939 5.873 80.064
1.014 0.044 0.916 0.041
(4.972) (23.847) (4.969) (18.369)
2.001 47.136 1.820 61.736
At amortised cost: Loss allowance
At fair value through profit or loss
Total Cash and cash equivalents
At amortised cost: Trade receivables
At amortised cost: Loans made for service purposes
At amortised cost: Loss allowance
Financial Assets included in Debtors
At amortised cost: Accrued interest
As at 31 March 2025
Financial Assets
As at 31 March 2026
At amortised cost: Principal
At amortised cost: Accrued interest
At amortised cost: Loss allowance
At fair value through other comprehensive income - designated
equity instruments
Total Investments
At amortised cost: Principal
Note: the figures in this table include accrued interest where this is applicable
Page 247 of 392

Page 248

119 
Annual Accounts 2024/25 PUBLIC
Fair value of group financial instruments
The fair value through other comprehensive income financial assets carried on the group balance sheet comprise
the Council’s insurance fund investments and the investments of the Paisley and Renfrew Common Good Funds.
The fair value of these investments equates to the market value of the investments as provided by the Council’s
investment manager, LGT Wealth Management. In terms of the fair value measurement hierarchy the financial
instruments measured at fair value are considered to be Level 1 being quoted prices (unadjusted) in active markets
for identical assets or liabilities that the authority can access at the measurement date, Level 2 being inputs other
than quoted prices that can be accessed at the measurement date, or Level 3 being unobservable inputs e.g.
cashflow forecasts or estimated creditworthiness (see table below). 
Carrying
Amount
Fair value Financial Liabilities Carrying
Amount
Fair value
£m £m £m £m
Financial liabilities measured at amortised cost:
(239.743) (189.683) Public Works Loan Board borrowing  2 (297.547) (238.477)
(48.211) (53.523) Non-PWLB borrowing (“market debt”) 2 (48.198) (53.858)
Other liabilities:
(80.875) (80.875) Service concession and finance lease liabilities 3 (77.103) (77.103)
(0.395) (0.395) Financial guarantees 3 (0.260) (0.260)
(369.224) (324.476) (423.108) (369.698)
Financial liabilities measured at amortised cost:
(29.898) n/a Borrowing from group entities (38.089) n/a
(32.506) n/a Trade payables: short-term (72.705) n/a
(62.404) (110.794)
Fair
value
level
Total financial liabilities for which fair value is disclosed
Total financial liabilities for which fair value is not disclosed
As at 31 March 2025 As at 31 March 2026
Carrying
Amount
Fair value Financial Assets Carrying
Amount
Fair value
£m £m £m £m
13.128 13.128 Callable deposits in money market funds 1 35.326 35.326
0.516 0.516 Euro account balances with the Council’s banker 2 0.550 0.550
28.604 28.604 Investments in pooled funds 1 31.927 31.927
42.248 42.248 67.803 67.803
17.534 17.534 Fixed term deposits with UK building societies 2 24.623 24.623
(6.168) (6.168) Callable deposits with UK banks and building societies* 2 7.077 7.077
0.040 0.040 Imprest accounts held at council establishments 2 0.040 0.040
1.023 1.037 Loans made for service purposes 3 0.925 0.945
12.429 12.443 32.665 32.685
54.677 54.691 100.468 100.488
Financial assets measured at amortised cost:
1.020 n/a Trade receivables and prepayments: long-term 0.934 n/a
47.093 n/a Receivables and prepayments: short-term 61.697 n/a
48.113 62.631
Total Financial assets measured at fair value
Total Financial assets measured at amortised cost
Total financial assets for which fair value is disclosed
Total financial assets for which fair value is not disclosed
As at 31 March 2025
(restated)
As at 31 March 2026
Fair
value
level
*includes current sterling account balances with the Council’s banker.
Page 248 of 392

Page 249

120 
Annual Accounts 2024/25 PUBLIC
The short-term nature of cash and cash equivalents means that their fair value equates to their balance sheet
carrying amount.  Further qualitative information on the fair value of financial instruments can be found in Note 22. 
Items of income, expense, gain and loss relating to group financial instruments 
The following items of income, expense, gain and loss relating to group financial instruments are included within
the lines ‘Financing and Investment income and expenditure’ and ‘(Surplus) or deficit from investments in equity
instruments designated as ‘Fair Value through Other Comprehensive Income (OCI*)’ in the group CIES. 
2024/25
Amortised
cost
Elected to
Fair Value
through OCI*
Fair Value
through Profit
or Loss 2025/26
£m £m £m £m £m £m
16.932 Interest expense 0.000 0.000 0.000 16.344 16.344
2.197 Impairment losses 1.602 0.000 0.000 0.000 1.602
0.000 Fee expense 0.000 0.000 0.000 0.022 0.022
0.423 Other expense 0.000 (0.600) 0.000 0.000 (0.600)
19.552 Total expense in the Surplus /
Deficit on the Provision of 1.602 (0.600) 0.000 16.366 17.368
(5.756) Interest income (1.687) 0.000 (1.105) 0.000 (2.792)
(0.828) Dividend income 0.000 (0.873) 0.000 0.000 (0.873)
(6.584) Total income in the
Surplus/Deficit on the Provision of (1.687) (0.873) (1.105) 0.000 (3.665)
0.040 Net (gain) or loss on revaluation 0.000 (2.588) (0.023) 0.000 (2.611)
0.040 (Surplus)/Deficit on the
revaluation of financial assets 0.000 (2.588) (0.023) 0.000 (2.611)
13.008 Net (Gain)/Loss for the year (0.085) (4.061) (1.128) 16.366 11.092
Financial Assets Financial
liabilities at
amortised
cost
Group Accounting Policies 
Introduction 
The Code of Practice on Local Authority Accounting in
the United Kingdom 2025/26 (“the Code”) requires
local authorities to consider their interests in all types
of entity. 
This includes other local authorities or similar bodies
defined in section 106 of the Local Government
(Scotland) Act 1973, for example statutory bodies
such as valuation boards. 
Authorities are required to prepare a full set of group
accounts in addition to their own Council’s accounts
where they have a material interest in such entities. 
Combining entities 
Renfrewshire Council’s group accounts consolidate
the results of the Council with the results of the
Paisley, Renfrew and Johnstone Common Good
Funds; the Coats Observatory Trust administered by
Renfrewshire Council; and eight other entities:
1. Renfrewshire Leisure Limited, trading as OneRen;
2. Paisley Museum Reimagined Limited;
3. Park Lane Developments (Renfrewshire) LLP;
4. Strathclyde Partnership for Transport;
5. Strathclyde Concessionary Travel Scheme Joint
Committee;
6. Renfrewshire Valuation Joint Board;
Page 249 of 392

Page 250

121 
Annual Accounts 2024/25 PUBLIC
7. Renfrewshire Health and Social Care Integration
Joint Board;
8. AMIDS (Renfrewshire) LLP.
The Council has effective control over OneRen,
Paisley Museum Reimagined Limited, the Paisley,
Renfrew and Johnstone Common Good Funds and
the Coats Observatory Trust administered by
Renfrewshire Council (as sole trustee) and, as such,
these are treated as subsidiaries in the Council’s
group accounts, with assets, liabilities, reserves,
income and expenses being consolidated line-by-
line. 
The Council also holds 50% (£50) of the share capital
of Park Lane Developments (Renfrewshire) LLP.
Under the terms of the Partnership Agreement, the
Council has enhanced voting rights and Park Lane
Developments (Renfrewshire) LLP has no claim on
the remaining assets should the partnership be
wound up; therefore, the entity is treated as a
subsidiary. 
Strathclyde Partnership for Transport and Strathclyde
Concessionary Travel Scheme Joint Committee are
included within the group accounts under the
definition of associate, even though the Council
holds less than 20% or more of the voting (or
potential voting) power (which is the criterion
normally used to confer significant influence).
However, the view has been taken that the nature of
the funding arrangements between the constituent
Councils and these entities is sufficient to confer
significant influence. 
Renfrewshire Valuation Joint Board is included within
the group accounts as an associate because the
Council does not have a controlling interest in the
body in terms of the voting rights. 
Renfrewshire Council’s share of each associate’s net
assets or liabilities is calculated based on the
Council’s proportionate contribution to each
associate’s annual revenue costs. The Council has
no shares in, or ownership of, any of these three
organisations, which are entirely independent of the
Council under law and for taxation. 
The Public Bodies (Joint Working) (Scotland) Act 2014
established the framework for the integration of
health and adult social care in Scotland. 
Scottish Ministers legally established the
Renfrewshire Health and Social Care Integration Joint
Board on 27 June 2015 as a formal legal partnership
between Renfrewshire Council and NHS Greater
Glasgow and Clyde. This entity is included as a joint
venture in the Council’s group accounts.
Renfrewshire Council’s share of the joint venture’s
net liabilities is calculated based on the Council’s
proportionate ordinary shareholding in the joint
venture. 
Basis of preparation of group statements
and going concern 
For the associates and joint ventures detailed above,
the combination has been accounted for under the
accounting conventions of the acquisition basis using
the equity method, with the Council’s share of the net
assets or liabilities of each entity incorporated and
adjusted each year by the Council’s share of that
entity’s results and the Council’s share of other gains
and losses (recognised in the group CIES). 
For four of the combining entities the Council has a
share in a net liability. The net liability position of both
the Renfrewshire Valuation Joint Board and OneRen
arises from the inclusion of liabilities related to the
defined benefit pension schemes as required by
IAS19 (which requires that pension liabilities reflect
the long-term cost of paying post-employment
benefits). For Park Lane Developments
(Renfrewshire) LLP the net liability arises from long-
term borrowing to fund regeneration work within and
around the site of the former Arnott’s store in Paisley. 
All of the organisations noted above prepare their
annual accounts on a going concern basis.
Arrangements with the Council and other funders for
Page 250 of 392

Page 251

122 
Annual Accounts 2024/25 PUBLIC
the longer-term funding of Park Lane Developments
(Renfrewshire) LLP are considered sufficient to meet
future funding requirements.  The Council will
continue to support Paisley Museum Reimagined
Limited until their anticipated revenue generation
materialises. 
Consideration for acquisition of
associates’ net assets or liabilities 
The Council has acquired its share of the net assets
of its associates for a nil consideration. There is no
deferred or contingent purchase consideration. A fair
value for its share of the net assets or liabilities of the
three joint boards and committees at the point of
acquisition and the post-acquisition results are
unable to be accurately determined in view of the
length of time since the transfer of these
responsibilities at local government re-organisation
in 1996 and the change in accounting for pensions
under FRS17 in 2003/04. 
It is not possible to provide the fair value of the
investment in the other combining entities of the
Council as there are no published price quotations
for these entities. No goodwill has been included in
the group balance sheet in view of the length of time
since acquisition, that no consideration was involved
and that a fair value at the date of acquisition cannot
now be properly assessed. 
Group boundary: non-material interests
in other entities 
The Council has a significant interest in three joint
committees that have not been included in the group
accounts. The Council’s share of their net assets or
liabilities is not material to the fair understanding of
the financial position and transactions of the Council.
In the interest of transparency, details of the business
nature of each organisation are shown in notes G1
and G2. 
Inventories 
Inventories (generally consumable stock) are
included in the group balance sheet at weighted
average cost and the lower of cost or net realisable
value: weighted average cost – Council’s stock; lower
of cost or net realisable value – OneRen’s stock. The
difference in valuation methods does not have a
material effect on the results of the group given the
levels of stockholdings in these entities. 
Post-employment benefits 
In common with Renfrewshire Council, all combining
entities, except Park Lane Developments
(Renfrewshire) LLP, participate in the Local
Government Pension Scheme, which is administered
locally by Glasgow City Council through the
Strathclyde Pension Fund. The associates have
accounting policies for pensions accounting that are
consistent with those of the Council. 
Property, plant and equipment 
The basis of valuation across the combining entities
is in accordance with the Code. Operational property,
plant and equipment assets are shown at the lower of
net replacement cost or net realisable value in
existing use with the following exceptions:
i) The Concessionary Travel Scheme Joint
Committee has no fixed assets.
ii) Strathclyde Partnership for Transport holds
exceptional types of fixed assets in its balance
sheet. Within intangible assets, there are
subsidised bus contracts that are recorded at
amortised cost. There are also “third-party”
assets that are rolling stock and other public
assets used by other transport operators but
which the partnership has the power to direct to
the benefit of the travelling public within the
partnership’s operating area – these are held at
historic cost.
iii) OneRen uses the historic cost convention for its
recent leasehold improvements, but this is
Page 251 of 392

Page 252

123 
Annual Accounts 2024/25 PUBLIC
considered a suitable proxy for market value in
existing use on a replacement cost basis. OneRen
also uses depreciated historic cost for its
computers, plant, furniture and fittings rather
than the Council’s depreciated replacement cost
basis, however this is not considered to be
material given the small values involved. 
Restrictions on the transfer of funds 
The Council’s share of the reserves of its associates
is unusable in that it cannot be used to fund the
Council’s services nor to reduce taxation. All
associates are entirely independent of the Council
under law and for taxation. The Council is unable to
access their reserves, whether classified as usable or
otherwise in the associate’s own financial
statements. 
Value Added Tax 
Value Added Tax in respect of the Council’s
subsidiaries that are independent of the Council
under law and for taxation, viz. OneRen, Park Lane
Development (Renfrewshire) LLP and Paisley
Museum Reimagined Limited, is accounted for within
income and expenditure to the extent that it is
irrecoverable from HM Revenue and Customs. 
Page 252 of 392

Page 253

Finance and Resources, Renfrewshire House, Cotton Street, Paisley PA1 1JB
Telephone: 0300 300 0285 www.renfrewshire.gov.uk
PUBLIC 
Page 253 of 392

Page 254

Page 254 of 392

Page 255

1
___________________________________________________________________
To: Council
On: 24 September 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Azets Report to those charged with governance - Coats Observatory
Trust Annual Accounts 2025/26
___________________________________________________________________
1. Summary
1.1 Each year the Council’s appointed external auditors carry out an audit of
the financial statements of the Coats Observatory Trust, controlled by
Renfrewshire Council, and provide an opinion as to whether those
statements provide a true and fair view of the financial position of the
charity and its income and expenditure for the year; and also whether they
have been prepared in accordance with the relevant regulations.
1.2 In accordance with International Auditing Standards (ISA260), the external
auditor, Azets, is obliged to report to those charged with the governance of
the organisation matters which have arisen in the course of the audit.
1.3 The attached ISA260 report from Azets outlines their findings from the audit
of the 2025/26 Coats Observatory Trust accounts.
1.4 Under the Local Authority Accounts (Scotland) Regulations 2014, the
Council must meet to consider the Annual Accounts and aim to approve
those accounts for signature no later than 30 September.
1.5 There was one audit adjustment made to the annual accounts over the
course of the audit. The figures and details are listed on page 23 of the
Annual Audit Report, and can be explained as follows:
• Statement of Financial Activities – To recognise the annual audit fee to
the Trust and corresponding donation from Renfrewshire Council.
PUBLIC Item 4
Page 255 of 392

Page 256

2
1.6 Other minor and presentational changes were also agreed, along with the
disclosure changes outlined on page 24 of the Annual Audit Report.
1.7 Azets officers will attend the meeting to present their reports
________________________________________________________________
2. Recommendations
2.1 Members are requested to consider the attached report from Azets.
___________________________________________________________________
Implications of the Report
1. Financial
The 2025/26 Annual Accounts demonstrate that the Council continues to
operate the Trust within the resources available, and in line with the relevant
legislation. The Trust’s audit fee, which was £6,760 in 2025/26, is paid by
Renfrewshire Council.
2. HR & Organisational Development
There are no direct implications arising from the recommendations in this
report.
3. Community/Council Planning
Community Plan
Our Renfrewshire is thriving The report demonstrates the
Council’s appropriate trusteeship of
the Coats Observatory Trust for the
benefit of the community.
Our Renfrewshire is well
Our Renfrewshire is fair
Our Renfrewshire is safe
Council Plan
Reshaping our place, our
economy and our future
The report demonstrates the
Council’s appropriate trusteeship of
the Coats Observatory Trust for the
benefit of the community.
Building strong, safe and resilient
communities
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Working together to improve
outcomes 
4. Legal
An audit opinion free from qualification demonstrates the Council’s
compliance with the statutory accounting requirements set out in the Local
PUBLIC
Page 256 of 392

Page 257

3
Government (Scotland) Act 1973, the Local Government in Scotland Act
2003, and the Charities Accounts (Scotland) Regulations 2006.
5. Property/Assets
The Coats Observatory is currently undergoing refurbishment work as part of
the Paisley Museum Reimagined project, however there are no direct
property implications arising from the recommendations in this report.
6. Information Technology
There are no direct implications arising from the recommendations in this
report.
7. Equality & Human Rights
There are no direct implications arising from the recommendations in this
report.
8. Health & Safety
There are no direct implications arising from the recommendations in this
report.
9. Procurement
There are no direct implications arising from the recommendations in this
report.
10. Risk
There are no direct implications arising from the recommendations in this
report.
11. Privacy Impact
There are no direct implications arising from the recommendations in this
report.
12. Cosla Policy Position
There are no direct implications arising from the recommendations in this
report.
13. Children’s Rights
There are no direct implications arising from the recommendations in this
report.
14. Climate Change
There are no direct implications arising from the recommendations in this
report.
___________________________________________________________________
Author: Christine McCourt, Head of Finance and Procurement
Page 257 of 392

Page 258

No embedded text on this page.

Page 259

PUBLIC
azets.co.uk
2025/26 Annual Audit Report to the Audit, Risk and
Scrutiny Board and the Controller of Audit
September 2026
azets.co.uk
Coats Observatory Trust Fund
Page 259 of 392

Page 260

Coats Observatory Trust Fund: 2025/26
Annual Audit Report to the Audit, Risk
and Scrutiny Board and the Controller of
Audit
Page 2 of 27
PUBLIC
Table of Contents
Key messages 3
Introduction 5
Financial statements audit 7
Appendices 18
This report is for the benefit of the Trust
Fund and is made available to the
Controller of Audit for Scotland and
Audit Scotland. This report has not been
designed to be of benefit to anyone
except for the Trust Fund , the
Controller of Audit for Scotland and
Audit Scotland.  It should not be quoted
in whole or in part without our prior
written consent and should not be relied
upon by third parties. No responsibility
is assumed by Azets Audit Services to
any third parties. We do not accept any
responsibility for any loss occasioned to
any third party acting, or refraining from
acting, on the basis of the content of
this report, as this report was not
prepared for, nor intended for, any
other purpose.
Page 260 of 392

Page 261

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 3 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Key messages
The Charities Accounts (Scotland) Regulations 2006 outline the accounting and auditing
requirements for charitable bodies. The Regulations require an auditor to prepare a report
to the charity trustees where an audit is required by any other enactment.
The Trust Fund is Renfrewshire Council’s charitable trust and is covered by the
requirements of section 106 of the Local Government (Scotland) Act 1973 and
consequently require a full audit. Each registered charitable trust has required a full audit
since 2013/14. Coats Observatory Trust Fund is a registered charity preparing its accounts
on an accruals basis. 
Financial statements audit
Audit opinion
The annual accounts are due to be considered by the Audit,
Risk and Scrutiny Board on 21 September 2026 and approved
upon completion of the audit.
We anticipate our independent auditor’s report to be
unqualified subject to the following concluding procedures: 
• Engagement manager and engagement lead final
quality reviews 
• Receipt and review of the signed management
representation letter 
• Receipt and review of the final amended signed
statement of accounts and trustees report 
• Response from management regarding subsequent
events up to the date of the opinion 
Audit approach
Our audit approach has been based on gaining an
understanding of the Trust Fund’s control environment and has
been risk based. This included:
• An evaluation of the internal control environment,
including the IT systems and controls; and
• Substantive testing on significant transactions and
material account balances, including the procedures
outlined in this report in relation to our significant audit
risks.
We have not altered our audit plan following receipt of the
draft financial statements.
Page 261 of 392

Page 262

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 4 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Key audit findings
The Trust Fund had reasonable administrative processes in
place to prepare the annual accounts and the supporting
working papers. 
We obtained adequate evidence in relation to the significant
audit risks identified in our audit plan. 
The accounting policies used to prepare the financial
statements are considered appropriate. We are satisfied with
the appropriateness of the accounting estimates and
judgements used in the preparation of the financial
statements. All material disclosures required by relevant
legislation and applicable accounting standards have been
made appropriately. 
Audit adjustments
One audit adjustment has been identified and made through
the course of the audit. 
No unadjusted misstatements were identified within the
financial statements.
Details of the adjusted misstatements and disclosure changes
are included at Appendix 2.
Internal controls
The purpose of the audit was for us to express an opinion on
the Trust Fund’s financial statements. The audit included
consideration of internal controls relevant to the preparation
of the financial statements in order to design audit procedures
that are appropriate in the circumstances, but not for the
purpose of expressing an opinion on the effectiveness of
internal control.
Our audit is, therefore, not designed to identify all control
weaknesses.
No material weaknesses or significant deficiencies were noted
during our audit.  
Page 262 of 392

Page 263

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 5 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Introduction
Scope of audit 
The annual audit comprises the audit of the financial statements. We outlined the scope of
our audit in our External Audit Plan for Renfrewshire Council (“the Council”), which we
presented to the Audit, Risk and Scrutiny Board at the outset of our audit. We have not made
any subsequent changes to the risks outlined in that plan.
Responsibilities
The Trustees are responsible for preparing its annual accounts, including financial
statements, which show a true and fair view of the results for the year and position at the
year end, and for implementing appropriate internal control systems. 
The weaknesses or risks identified in this report are only those that have come to our
attention during our normal audit work. Communication in this report of matters arising from
the audit or of risks or weaknesses does not absolve management from its responsibility to
address the issues raised and to maintain an adequate system of control.
The primary responsibility for the prevention and detection of fraud rests with management
and those charged with governance, including establishing and maintaining internal controls
over the reliability of financial reporting, effectiveness and efficiency of operations and
compliance with applicable laws and regulations. As auditors, we obtain reasonable, but not
absolute, assurance that the financial statements, as a whole, are free from material
misstatement, whether caused by fraud or error.
We would like to thank all management and staff for their co-operation and assistance during
our audit.
Auditor independence
International Standards on Auditing in the UK (ISAs (UK)) require us to communicate on a
timely basis all facts and matters that may have a bearing on our independence.
We confirm that we complied with the Financial Reporting Council’s (FRC) Ethical Standard. In
our professional judgement, we remained independent, and our objectivity has not been
compromised in any way.
We set out in Appendix 1 our assessment and confirmation of independence. 
Adding value
All of our clients quite rightly demand of us a positive contribution to meeting their ever-
changing business needs. We add value by being constructive and forward looking, by
Page 263 of 392

Page 264

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 6 of 27                                                                                                               www.azets.co.uk 
PUBLIC
identifying areas of improvement and by recommending and encouraging good practice. In
this way we aim to promote improved standards of governance, better management and
decision making and more effective use of public money.
Any comments you may have on the service we provide would be greatly appreciated.
Comments can be reported directly to any member of your audit team or to Audit Scotland.
Openness and transparency
This report will be published on Audit Scotland’s website www.audit-scotland.gov.uk. 
Page 264 of 392

Page 265

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 7 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Financial statements audit
Under International Standards on Auditing (UK) and the Code of Audit Practice approved by
the Accounts Commission for Scotland, we are required to report whether, in our opinion:
• The financial statements give a true and fair view of the state of affairs of the Trust Fund
as at 31 March 2026 and of its incoming resources and application of resources for the
year then ended;
• The financial statements have been properly prepared in accordance with United
Kingdom Generally Accepted Accounting Practice; 
• The financial statements have been prepared in accordance with the requirements of the
Charities and Trustee Investment (Scotland) Act 2005, and regulation 8 of The Charities
Accounts (Scotland) Regulations 2006; and
• The information given in the Trustees' Annual Report for the financial year for which the
financial statements are prepared is consistent with the financial statements and that
report has been prepared in accordance with the Charities SORP (FRS 102).
We are also required to report on whether the other information included in the annual
accounts (including the Trustees’ Annual Report) is materially consistent with the financial
statements or our knowledge obtained in the audit or otherwise appears to be materially
misstated.
Our audit opinion
Opinion Basis for opinion Conclusions
Financial statements We conduct our audit in
accordance with applicable
law and International
Standards on Auditing.
Our findings / conclusions to
inform our opinion are set
out in this section of our
annual audit report.
The annual accounts are due to
be considered by the Audit, Risk
and Scrutiny Board on 21
September 2026 and approved
upon completion of the audit.
We intend to issue unqualified
opinions in our independent
auditor’s report. 
Page 265 of 392

Page 266

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 8 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Opinion Basis for opinion Conclusions
Going concern basis of
accounting
In preparing the financial
statements, the trustees are
responsible for assessing 
the charity's ability to
continue as a going concern,
disclosing, as applicable, 
matters related to going
concern and using the going
concern basis of 
accounting unless the
trustees intend to
discontinue the charity's
operations, or 
have no realistic alternative
but to do so.
We have concluded that the use
of the going concern basis of
accounting in the preparation of
the financial statements is
appropriate.
Other information:
Our opinion on the
financial statements
does not cover the
other information and
we do not express any
form of assurance
conclusion thereon
except to the extent
explicitly stated in the
opinions prescribed by
the Accounts
Commission.
We are required to consider
whether the other
information is materially
inconsistent with the
financial statements or with
other knowledge obtained
during the audit or
otherwise appears
materially misstated. 
We have nothing to report in this
regard.
Opinions prescribed by
the Accounts
Commission On the
Trustees’ Annual Report 
We plan and perform audit
procedures to gain
assurance that information
given in the Trustees'
Annual Report is consistent
with the financial
statements and that report
has been prepared in
We have no matters to report.
Page 266 of 392

Page 267

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 9 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Opinion Basis for opinion Conclusions
accordance with the
Charities SORP (FRS 102). 
Matters reported by
exception
We are required to report
on whether:
• proper accounting
records have not been
kept; or
• the financial statements
are not in agreement
with the accounting
records; or
• we have not received all
the information and
explanations we require
for our audit. 
We have no matters to report. 
An overview of the scope of our audit
The scope of our audit was detailed in our External Audit Plan for the Renfrewshire Council,
which was presented to the Audit, Risk and Scrutiny Board in March 2026. The plan explained
that we follow a risk-based approach to audit planning that reflects our overall assessment of
the relevant risks that apply to the Trust Fund. This ensures that our audit focuses on the
areas of highest risk (the significant risk areas). Planning is a continuous process, and our
audit plan is subject to review during the course of the audit to take account of
developments that arise.
In our audit, we test and examine information using sampling and other audit techniques, to
the extent we consider necessary to provide a reasonable basis for us to draw conclusions.
This includes:
• An evaluation of the Trust Fund’s internal control environment, including the IT systems
and controls; and
• Substantive testing on significant transactions and material account balances, including
procedures outlined in this report in relation to our key audit risks.  
Page 267 of 392

Page 268

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 10 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Quality indicators
We have applied a suite of quality indicators to assess the reliability of the Trust’s financial
reporting and response to the audit.
Metric Grading (Mature /
developing /
significant
improvement
required)
Commentary
Quality and timeliness of
draft financial statements
Mature We received the unaudited financial
statements in line with our agreed audit
timetable. The financial statements were
of a good standard. Revisions were
provided promptly where required.
Quality of working papers
provided and adherence to
timetable
Mature We received supporting working papers
in line with our audit timetable. These
were also of a good standard. Further
information was provided promptly
where required.
Timing and quality of key
accounting judgements
Mature We did not identify any issues with the
timing and quality of key accounting
judgements.
Access to finance team
and other key personnel
Mature We received full access to the finance
team and other key personnel
throughout the audit. All audit queries
and requests were responded to in a
timely manner.
Quality and timeliness of
the Annual Accounts.
As well as the quality and
timeliness of supporting
working papers for those
statements.
Mature We did not identify any issues with
quality and timeliness of the audited part
of the Annual Accounts. 
Page 268 of 392

Page 269

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 11 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Metric Grading (Mature /
developing /
significant
improvement
required)
Commentary
Volume and magnitude of
identified errors
Mature We identified one error on audit which
the Trust Fund agreed to adjust. Further
details are set out in Appendix 2. There
were no unadjusted misstatements. 
Significant risk areas and key audit matters
Significant risks are defined by auditing standards as risks that, in the judgement of the
auditor, require special audit consideration. In identifying risks, we consider the nature of the
risk, the potential magnitude of misstatement, and its likelihood. Significant risks are those
risks that have a higher risk of material misstatement. Audit procedures are designed to
mitigate these risks.
As required by the Code of Audit Practice and the planning guidance issued by Audit
Scotland, we considered the significant risks for the audit that had the greatest effect on our
audit strategy, the allocation of resources in the audit and directing the efforts of the audit
team. These were defined as the ‘Key Audit Matters’ for the audit, as detailed in the tables
below. 
Our audit procedures relating to these matters were designed in the context of our audit of
the annual accounts as a whole, and not to express an opinion on individual balances,
transactions or disclosures.
We do not expect to modify our opinion on the Trust Fund’s annual accounts with respect to
any of the risks described below.
The table below summarises each significant risk and whether it reflects a fraud risk and/or
Key Audit Matter. Detail behind each risk and the work undertaken is set out on the following
pages.
Page 269 of 392

Page 270

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 12 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Risk area  Financial
statement
/ Assertion
level risk
Fraud
risk
Key Audit
Matter
Risk of
material
misstatement
Outcome of work
Management
override of
controls
Financial
statement
Yes Yes Very High
From our work we found no
evidence of fraud or error
through management
override of controls. 
Significant risks at the financial statement level
These risks are considered to have a pervasive impact on the financial statements as a whole
and potentially affect many assertions for classes of transaction, account balances and
disclosures.
Risk area Management override of controls
Significant risk
description
Management is in a unique position to perpetrate fraud because
of their ability to manipulate accounting records and prepare
fraudulent financial statements by overriding controls that
otherwise appear to be operating effectively. 
Although the level of risk of management override of controls
will vary from entity to entity, the risk is nevertheless present in
all entities. Due to the unpredictable way in which such override
could occur, it is a risk of material misstatement due to fraud
and thus a significant risk.
This was considered to be a significant risk and Key Audit Matter
for the audit.
Risk of material misstatement: Very High
Page 270 of 392

Page 271

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 13 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Risk area Management override of controls
How the scope of our
audit responded to the
significant risk
Key judgement
There is the potential for management to use their judgement to
influence the financial statements as well as the potential to
override controls for specific transactions. 
Audit procedures
• Documented our understanding of the journals posting
process and evaluated the design effectiveness of
management controls over journals;
• Analysed the journals listing for the year and determined the
criteria for selecting high risk and/or unusual journals;
• Tested high risk and/or unusual journals posted during the
year and after the draft accounts stage back to supporting
documentation for appropriateness and corroboration and
to ensure approval had been undertaken in line with the
Trust Fund’s journals policy;
• Gained an understanding of the key accounting estimates
and critical judgements made by management. We
challenged key assumptions and considered for
reasonableness and evaluated any indicators of bias which
could result in material misstatement due to fraud; and
• Evaluated the rationale for any changes made to accounting
policies, estimates or significant unusual transactions.
Key observations
We have not identified any indication of management override
of controls in the year. We did not identify any areas of bias in
key judgements made by management and judgements were
consistent with prior years. 
Page 271 of 392

Page 272

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 14 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Materiality
Materiality is an expression of the relative significance of a matter in the context of the
financial statements as a whole. A matter is material if its omission or misstatement would
reasonably influence the decisions of an addressee of the auditor’s report. The assessment of
what is material is a matter of professional judgement and is affected by our assessment of
the risk profile of the Trust Fund and the needs of users. We reviewed our assessment of
materiality throughout the audit.
Whilst our audit procedures are designed to identify misstatements which are material to our
audit opinion, we also report any uncorrected misstatements of lower value errors to the
extent that our audit identifies these. 
Our initial assessment of materiality was £55,000. On receipt of the 2025/26 unaudited
financial statements, we reassessed materiality and updated it from our initial assessment to
£71,000. We consider that our updated assessment has remained appropriate throughout
our audit. 
Materiality
£
Overall materiality for the financial statements £71,000
Performance materiality (75% of materiality) £53,250
Trivial threshold £3,550
Materiality
Our assessment is made with reference to the Trust Fund’s net assets.
We consider this to be the principal consideration for users of the
financial statements when assessing financial performance.
Our assessment of materiality equates to approximately 3% of net
assets as disclosed in the 2025/26 unaudited annual accounts.
The financial statements are considered to be materially misstated
where total errors exceed this value.
Page 272 of 392

Page 273

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 15 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Performance
materiality
75% of materiality
Performance materiality is the working level of materiality used
throughout the audit. We use performance materiality to determine
the nature, timing and extent of audit procedures carried out. We
perform audit procedures on all transactions, or groups of transactions,
and balances that exceed our performance materiality. This means that
we perform a greater level of testing on the areas deemed to be at
significant risk of material misstatement.
Performance materiality is set at a value less than overall materiality for
the financial statements as a whole to reduce to an appropriately low
level the probability that the aggregate of the uncorrected and
undetected misstatements exceed overall materiality. 
Trivial
misstatements 
5% of overall materiality
Trivial misstatements are matters that are clearly inconsequential,
whether taken individually or in aggregate and whether judged by any
quantitative or qualitative criteria.
Individual errors above this threshold are communicated to those
charged with governance. 
We also consider whether any specific items of account require a separate, lower materiality.
We have determined that no specific materiality levels needed to be set for this audit.
Internal controls
As part of our work we considered internal controls relevant to the preparation of the
financial statements such that we were able to design appropriate audit procedures. Our
audit is not designed to test all internal controls or identify all areas of control weakness.
However, where, as part of our testing, we identify any control weaknesses, we report these
at Appendix 3. These matters are limited to those which we have concluded are of sufficient
importance to merit being reported.
We did not identify any significant control weaknesses during our audit.
Other communications
We set out below details of other matters which we, as auditors, are required by auditing
standards and the Code to communicate to those charged with governance. 
Page 273 of 392

Page 274

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 16 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Matter Audit commentary and findings
Significant matters on which there was
disagreement with management
There were no significant matters on which
there was disagreement with management.
Significant management judgements which
required additional audit work and / or
where there was disagreement over the
judgement and / or where the judgement
is significant enough that we are required
to report it to those charged with
governance before they consider their
approval of the accounts
There were no other significant management
judgements which required additional audit
work, where there was disagreement over
the judgement or where the judgement is
significant enough that requires reporting.
Prior year adjustments identified
At the time of writing this report, there were
no prior year adjustments found by the audit
team.
However, there was restatement to the
account identified by finance team including
the following; 
• Restatement of Statement of Financial
Activities -Expenditure relating to
Trust Fund assets. This is a
presentational issue only relating to
how donation income has been
applied to expenditure on capital
assets and does not impact on the
Total Funds held by the Trust.
Concerns identified in the following:
• Consultation by management with
other accountants on accounting or
auditing matters
• Matters significant to the oversight of
the financial reporting process
• Adjustments / transactions identified
as having been made to meet an
agreed system position / target
No concerns were identified in relation to
these areas. 
Page 274 of 392

Page 275

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 17 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Accounting policies
Our work included a review of the adequacy of disclosures in the financial statements and
the appropriateness of the accounting policies adopted by the Trust Fund. 
The accounting policies, which are disclosed in the financial statements are considered
appropriate. The accounting policies used in preparing the financial statements are
unchanged from the previous year. 
Key judgements and estimates
As part of the planning stages of the audit, we identified the accounting estimates made by
management and determined which of those are key to the overall financial statements.
We reviewed the key estimates and judgements that management made in respect to the
identified key accounting estimates for indication of bias and assessed whether the
judgements used by management are reasonable.
Presentation and disclosures 
There are no significant financial statements disclosures that we consider should be brought
to your attention. All the disclosures required by relevant legislation and applicable
accounting standards have been made appropriately.
Fraud and suspected fraud
We have previously discussed the risk of fraud with management and the Audit, Risk and
Scrutiny Board. We have not been made aware of any incidents in the period. No issues have
been identified during the course of our audit.
Our work as auditor is not intended to identify any instances of fraud of a non-material
nature and should not be relied upon for this purpose.
Non-compliance with laws and regulations
As part of our standard audit testing, we have reviewed the laws and regulations impacting
the Trust Fund. There are no indications from this work of any significant incidences of non-
compliance or material breaches of laws and regulations. You have not made us aware of any
significant incidences of non-compliance with relevant laws and regulations.
Written representations
A letter of management representations has been requested from the Trust Fund. 
Related parties
We are not aware of any related parties or related party transactions which have not been
disclosed.  
Page 275 of 392

Page 276

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 18 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Appendices 
Appendix 1: Responsibilities of Coats Observatory Trust Fund and Auditors 19
Appendix 2: Audit adjustments 23
Appendix 3: Action plan 25
Appendix 4: Follow up of prior year recommendations 26 
Page 276 of 392

Page 277

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 19 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Appendix 1: Responsibilities of the Trust Fund and the
Auditor
Responsibilities of the Trust
The Trust Fund is required to make arrangements for the proper administration of its
financial affairs and to secure that one of its officers has responsibility for the administration
of those affairs. The Director of Finance and Resources has been designated as that officer at
the Trust Fund. They manage the affairs of the Trust Fund to secure the economic, efficient
and effective use of resources and safeguard its assets.
Area Trust’s responsibilities
Corporate
governance
The Director of Finance and Resources has responsibility for ensuring that
an effective system of internal financial control is maintained and
operated. This system of internal financial control can only provide
reasonable and not absolute assurance that assets are safeguarded,
transactions are recorded and properly authorised, and that material
errors or irregularities are either prevented, or detected within a timely
period. The system of internal financial control is based on a framework of
regular management information, financial regulations, administrative
procedures and a system of delegation and accountability. The Director of
Finance and Resources is responsible for keeping proper accounting
records that are up to date and ensure that the financial statements
comply with the Charities Accounts (Scotland) Regulations 2006 (as
amended) and Accounting and Reporting by Charities: Statement of
Recommended Practice (SoRP) applicable to charities preparing their
accounts in accordance with the Financial Reporting Standard for Smaller
Entities published on 16 July 2014. Decisions regarding the operation,
assets, processes or policies of the Trust Fund are delegated by the Council
to the Finance, Resources and Customer Services Policy Board (FRCSPB).
Financial
statements
and related
reports
The Trust Fund has responsibility for: 
• preparing financial statements which give a true and fair view of the
financial position of the Trust Fund and its expenditure and income, in
accordance with the applicable financial reporting framework and
relevant legislation; and
• maintaining accounting records and working papers that have been
prepared to an acceptable professional standard and support the
Page 277 of 392

Page 278

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 20 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Area Trust’s responsibilities
balances and transactions in its financial statements and related
disclosures.
Management is responsible, with the oversight of those charged with
governance, for communicating relevant information to users about the
Trust and its financial performance, including providing adequate
disclosures in accordance with the applicable financial reporting
framework. The relevant information should be communicated clearly and
concisely.
Standards of
conduct for
prevention
and detection
of fraud and
error
The Trustees are responsible for establishing arrangements to prevent and
detect fraud, error and irregularities, bribery and corruption and also to
ensure that its affairs are managed in accordance with proper standards of
conduct. 
Auditor responsibilities
Code of Audit Practice
The Code of Audit Practice (the Code) describes the high-level, principles-based purpose and
scope of public audit in Scotland.
The Code outlines the responsibilities of external auditors and it is a condition of our
appointment that we follow it.
Our responsibilities
Auditor responsibilities are derived from the Code, statute, International Standards on
Auditing (UK) and the Ethical Standard for auditors, other professional requirements and best
practice, and guidance from Audit Scotland. 
We act independently in carrying out our role and in exercising professional judgement. We
report to the Audit, Risk and Scrutiny Board and others, including Audit Scotland, on the
results of our audit work.
Weaknesses or risks, including fraud and other irregularities, identified by auditors, are only
those which come to our attention during our normal audit work in accordance with the
Code and may not be all that exist.
Page 278 of 392

Page 279

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 21 of 27                                                                                                               www.azets.co.uk 
PUBLIC
A further description of the auditor’s responsibilities for the audit of the financial statements
is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of our auditor’s report.
Audit quality
The Auditor General and the Accounts Commission require assurance on the quality of public
audit in Scotland through comprehensive audit quality arrangements that apply to all audit
work and providers. These arrangements recognise the importance of audit quality to the
Auditor General and the Accounts Commission and provide regular reporting on audit quality
and performance.
Audit Scotland maintains and delivers an Audit Quality Framework.
The most recent audit quality report can be found at Quality of public audit in Scotland:
Annual report 2025/26 | Audit Scotland
Independence and ethics
The Ethical Standards and ISA (UK) 260 require us to report full and fair disclosure of matters
relating to our independence. In accordance with our profession’s ethical requirements and
further to our audit plan issued confirming audit arrangements we confirm that there are no
further facts or matters that impact on our integrity, objectivity and independence as
auditors that we are required or wish to draw to your attention. 
Non-audit services: No non-audit services are provided to the Trust Fund.
Contingent fees: No contingent fee arrangements are in place for any services provided.
Gifts and hospitality: We have not identified any gifts or hospitality provided to, or received
from, any member of the Trust Fund, senior management or staff and members of the audit
team.
Relationships: We have no other relationships with the Trust Fund, its directors, senior
managers and affiliates, and we are not aware of any former partners or staff being
employed, or holding discussions in anticipation of employment, as a director, or in a senior
management role covering financial, accounting or control related areas.
Our period of total uninterrupted appointment as at the end of 31 March 2026 was four
years.  
Page 279 of 392

Page 280

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 22 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Audit fees
The total fees charged to the Trust Fund for the provision of services in 2025/26 were as
follows. Prior year fees are also shown for comparative purposes: 
2025/26 2024/25
Auditor remuneration (expected fee level) £6,760 £6,480
Total audit fee £6,760 £6,480 
Page 280 of 392

Page 281

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 23 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Appendix 2: Audit adjustments
Adjusted misstatements
Details of items corrected following discussions with management are as below.
Current year audit adjustments 
No Detail Statement of Financial
Activities
Statement of
Balances  
Dr / (Cr) Dr / (Cr)
1. To record the Trust fund audit fee
this year of £6,760.
Dr. Governance Costs: External
Audit Fee
Cr. Donation from Renfrewshire
Council 
6,760
(6,760) 
Net impact on reserves (restricted
funds )– increase / (decrease)
- - 
Total reserves (restricted funds) per
the unaudited financial statements 
2,368,664 2,368,664 
Revised reserves (restricted funds)
per the audited financial statements
2,368,664 2,368,664 
Unadjusted misstatements
We have not identified any unadjusted misstatements during our audit. 
Misclassification and disclosure changes
Our work included a review of the adequacy of disclosures in the financial statements and
consideration of the appropriateness of the accounting policies and estimation techniques
adopted by the Trust Fund. 
We identified some presentational issues in the financial statements, and these have all been
amended by management. Details of all disclosure changes amended by management
following discussions are as below.  
Page 281 of 392

Page 282

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 24 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Adjusted
No Detail 
1. Minor presentational, formatting and disclosure issues. 
We proposed a number of minor changes and narrative amendments to improve
the presentation of the accounts.
2. To disclose a restatement note to explain the changes being made to the prior year
comparative figure. 
3. To update note 2 Analysis of income/expenditure to better reflect the transactions
occurring in the year. 
4. To disclose auditor’s remuneration.   
Unadjusted 
We have not identified any unadjusted misclassification and disclosure changes to report.
Prior year unadjusted misstatements
There were no prior year unadjusted misstatements reported in the prior year audit. 
Page 282 of 392

Page 283

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 25 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Appendix 3: Action plan
Our action plan details the weaknesses and opportunities for improvement that we have
identified during our 2025/26 audit.  The matters reported are limited to issues we have
identified during the course of our audit which we feel are of sufficient importance to merit
reporting to you under the auditing standards.
The recommendations are categorised into three risk ratings:
Key:
1. Significant deficiency
2. Other deficiency
3. Other observation
We have not identified any control weaknesses that require reporting during the course of
our audit work. 
Page 283 of 392

Page 284

Coats Observatory Trust Fund: 2025/26 Annual Audit Report to the Audit,
Risk and Scrutiny Board and the Controller of Audit
|   Azets 
Page 26 of 27                                                                                                               www.azets.co.uk 
PUBLIC
Appendix 4: Follow up of prior year recommendations
As part of our audit work we have followed up on control weaknesses and recommendations
either raised in last year’s Annual Audit Report or carried forward from prior years.
We confirm there were no recommendations raised in the prior year that required follow up
in the current year audit.
Page 284 of 392

Page 285

PUBLIC 
© Azets 2026. All rights reserved. Azets refers to Azets Audit
Services Limited. Registered in England & Wales Registered
No. 09652677. VAT Registration No. 219 0608 22. Registered
to carry on audit work in the UK and regulated for a range of
investment business activities by the Institute of Chartered
Accountants in England and Wales.
Moving forward with confidence
info@azets.co.uk     |    azets.co.uk Page 285 of 392

Page 286

Finance & Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley PA1 1JB
www.renfrewshire.gov.uk
My Ref: AM/CB
Contact: Alastair MacArthur
Telephone Number: 0300 300 0285
E Mail: alastair.macarthur@renfrewshire.gov.uk
Azets Audit Services
Quay 2 
139 Fountainbridge 
Edinburgh 
EH3 9QG
Dear Sirs
Coats Observatory Trust Fund
Financial Statements for the year ended 31 March 2026
This representation letter is provided for the purpose of expressing an opinion as to whether
Coats Observatory Trust Fund’s (“The Trust Fund”) financial statements present a true and
fair view, in all material respects, in accordance with applicable law and UK adopted
international accounting standards, as interpreted and adapted by the Charities Statement of
Recommended Practice (SORP).
I confirm to the best of my knowledge and belief and having made appropriate enquiries of
the Coats Observatory Trust Fund’s trustees, the following representations given to you in
connection with your audit of Coats Observatory Trust Fund’s annual accounts for the year
ended 31 March 2026. All representations are made to the best of our knowledge and belief.
Financial Statements
i. We have fulfilled our responsibilities as trustees under the Statement of
Recommended Practice applicable to charities preparing their accounts in
accordance with the Financial Reporting Standard 102, the Charities and Trustee
Investment (Scotland) Act 2005, and the Charities Accounts (Scotland)
Regulations 2006, for the preparation of Coats Observatory Trust Fund’s financial
statements in accordance with applicable law and UK adopted international
accounting standards, as interpreted and adapted by the Charities Statement of
Recommended Practice (SORP), for being satisfied that they give a true and fair
view and for making accurate representations to you.
ii. All the transactions undertaken by Coats Observatory Trust Fund have been
properly reflected and recorded in the accounting records.
iii. All the accounting records have been made available to you for the purpose of
your audit. I have provided you with unrestricted access to all appropriate persons
within the charity, and with all other records and related information requested,
PUBLIC
Page 286 of 392

Page 287

Finance & Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley PA1 1JB
www.renfrewshire.gov.uk
including minutes of all management and trustee meetings and correspondence
with the Office of the Scottish Charity Regulator.
iv. The financial statements are free of material misstatements, including omissions.
v. I have reviewed and approved all disclosures made in the financial statements
and I am not aware of any other matters which require disclosure (See appendix 1
for details of such audit adjustments).
vi. All prior year adjustments of which I am aware have been made to the financial
statements and these are appropriately disclosed in the financial statements. (See
appendix 1 for details of such adjustments).
vii. I acknowledge my responsibility for the design, implementation and maintenance
of internal control to prevent and detect fraud and error, and I believe that I have
appropriately fulfilled these responsibilities.
viii. The Trust Fund has satisfactory title to all assets. The Trust Fund has no plans or
intentions that may materially alter the carrying value and, where relevant, the fair
value measurements or classification of assets and liabilities as at 31 March 2026
reflected in the financial statements.
ix. Except as disclosed in the financial statements:
a. there are no unrecorded liabilities, actual or contingent;
b. none of the assets of the Trust Fund has been assigned, pledged or
mortgaged;
c. there are no material prior year charges or credits, nor exceptional or non-
recurring items requiring separate disclosure.
x. Related party relationships and transactions have been appropriately accounted
for and disclosed in accordance with the requirements of applicable law and
accounting standards.
xi. All events subsequent to the date of the financial statements and which require
adjustment or disclosure have been adjusted or disclosed.
xii. Actual or possible litigation and claims have been accounted for and disclosed in
accordance with the requirements of UK adopted international accounting
standards, and as interpreted and adapted by the Charities SORP.
xiii. I believe that the Trust Fund’s financial statements should be prepared on a going
concern basis. I do not expect the Trust Fund to demise in its current
organisational form. I believe that no further disclosures relating to the Trust
Fund’s ability to continue as a going concern need to be made in the financial
statements.
PUBLIC
Page 287 of 392

Page 288

Finance & Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley PA1 1JB
www.renfrewshire.gov.uk
Information Provided
xiv. I have provided you with:
a. access to all information of which I am aware that is relevant to the
preparation of the Trust Fund’s financial statements such as accounting
records, and all other records requested;
b. additional information that you have requested from us for the purpose of your
audit; and
c. unrestricted access to persons within the Trust Fund (via remote
arrangements where necessary), from whom you determined it necessary to
obtain audit evidence.
xv. I have communicated to you all deficiencies in internal control of which
management is aware.
xvi. All transactions undertaken by the Trust Fund have been recorded in the
accounting records and are properly reflected in the financial statements.
xvii. I have disclosed to you the results of my assessment of the risk that the financial
statements may be materially misstated as a result of fraud.
xviii. I have disclosed to you all information in relation to known fraud or suspected
fraud that I am aware of and that affects the Trust Fund and involves:
a. management;
b. employees who have significant roles in internal control; or
c. others where the fraud could have a material effect on the financial
statements.
xix. I have disclosed to you all information in relation to instances of, or allegations of
fraud, or suspected fraud, affecting the financial statements communicated by
employees, former employees, analysts, regulators or others.
xx. I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when
preparing financial statements.
xxi. I have disclosed to you the identity of the Trust Fund’s related parties and all the
related party relationships and transactions of which I am aware.
xxii. I have disclosed to you all known actual or possible litigation and claims whose
effects should be considered when preparing the financial statements.
xxiii. I acknowledge our legal responsibilities regarding disclosure of information to you
as auditors and confirm that so far as I am aware, there is no relevant audit
information needed by you in connection with preparing your audit report of which
you are unaware.
PUBLIC
Page 288 of 392

Page 289

Finance & Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley PA1 1JB
www.renfrewshire.gov.uk
Assets and liabilities
xxiv. The Trust Fund has satisfactory title to all assets and there are no liens or
encumbrances on the charity’s assets.
xxv. All actual liabilities, contingent liabilities and guarantees given to third parties have
been recorded or disclosed as appropriate.
xxvi. Where plans or intentions that may materially alter the carrying value and, where
relevant, the fair value measurements or classification of assets and liabilities,
these are fully reflected in the financial statements.
xxvii. I confirm that the valuation of the Observatory asset has been assessed for
impairment and I am comfortable that the valuation remains appropriate as at 31st
March 2026. The assets are currently undergoing refurbishment and will be
revalued once the work is complete.
Accounting estimates
xxviii. The methods, data and significant assumptions used by us in making accounting
estimates, including those measured at fair value, are appropriate to achieve
recognition, measurement and disclosure that is reasonable in the context of the
applicable financial reporting framework. I am satisfied that the material
judgements used in the preparation of the financial statements are soundly based
and adequately disclosed in the financial statements.
Grants and donations
xxix. All grants, donations and other income, the receipt of which is subject to specific
terms or conditions, have been notified to you. There have been no breaches of
terms or conditions in the application of such income.
Approval
I acknowledge our legal responsibilities regarding disclosure of information to you as
auditors and confirm that so far as I am aware, there is no relevant audit information needed
by you in connection with preparing your audit report of which you are unaware.
The approval of this letter of representation was minuted by the Audit, Risk and Scrutiny
Board at its meeting on 21 September 2026.
Yours faithfully
Name: Alastair MacArthur
Position: Director of Finance and Resources
Date:
PUBLIC
Page 289 of 392

Page 290

Finance & Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley PA1 1JB
www.renfrewshire.gov.uk
Appendix 1
Adjusted misstatements
Current year audit adjustments
No Detail Statement of Financial
Activities
Statement of
Balances
Dr / (Cr) Dr / (Cr)
1. To record the Trust fund audit fee this year
of £6,760.
Dr. Governance Costs: External Audit Fee
Cr. Donation from Renfrewshire Council
6,760
(6,760)
Net impact on reserves (restricted funds
)– increase / (decrease)
- -
Total reserves (restricted funds) per the
unaudited financial statements
2,368,664 2,368,664
Revised reserves (restricted funds) per the
audited financial statements
2,368,664 2,368,664
Prior year adjustments
• Restatement of Statement of Financial Activities -Expenditure relating to Trust Fund assets:
Due to double accounting of expenditure.
PUBLIC
Page 290 of 392

Page 291

1
PUBLIC
___________________________________________________________________
To: Council
On: 24 September 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Audited Financial Statements 2025/26 – Coats Observatory Trust
___________________________________________________________________
1. Summary
1.1 The 2025/26 unaudited financial statements were approved by Council on
22 June 2026. Each year the appointed external auditors carry out an audit
of the financial statements of Coats Observatory Trust and provide an
opinion as to whether those statements provide a true and fair view of the
financial position of the charity and its income and expenditure for the year;
and also whether they have been prepared in accordance with the relevant
regulations.
1.2 The audited financial statements are now presented for Members’ noting
and further recommendation to the Council that they be approved.
1.3 There was one audit adjustment made to the annual accounts over the
course of the audit, along with other presentational and disclosure changes.
These are detailed in Azets Annual Audit report, presented at agenda item
3.
___________________________________________________________________
2. Recommendations
2.1 The Council is requested to approve the attached 2025/26 audited
financial statements for the Coats Observatory Trust.
Item 5
Page 291 of 392

Page 292

2
Implications of the Report
1. Financial – The 2025/26 Annual Accounts demonstrate the Council
continues to manage the charity it controls within the resources available
and in line with relevant legislation.
2. HR & Organisational Development – none directly arising from this report.
3. Community/Council Planning – none directly arising from this report.
4. Legal – An audit opinion free from qualification demonstrates compliance
with the relevant legislation and statutory accounting requirements.
5. Property/Assets – none directly arising from this report.
6. Information Technology – none directly arising from this report.
7. Equality & Human Rights – none directly arising from this report.
8. Health & Safety – none directly arising from this report.
9. Procurement – none directly arising from this report.
10. Risk – none directly arising from this report.
11. Privacy Impact – none directly arising from this report.
12. Cosla Policy Position – none directly arising from this report.
13. Children’s Rights – none directly arising from this report.
14. Climate Risk – none directly arising from this report.
___________________________________________________________________
Author: Christine McCourt, Head of Finance and Procurement
PUBLIC
Page 292 of 392

Page 293

Appendix 3
RENFREWSHIRE COUNCIL
COATS OBSERVATORY TRUST FUND
SC019454
TRUSTEES’ REPORT
AND FINANCIAL STATEMENTS
1 APRIL 2025 to 31 MARCH 2026
PUBLIC
Page 293 of 392

Page 294

Contents
TRUSTEES’ REPORT .........................................................................1
INDEPENDENT AUDITOR’S REPORT  ........................................................4
TRUST ACCOUNTS FINANCIAL STATEMENTS OVERVIEW ................................8
STATEMENT OF FINANCIAL ACTIVITIES FOR THE YEAR ENDED 31 MARCH 2026 .....9
STATEMENT OF BALANCES AS AT 31 MARCH 2026 ................................... 10
NOTES TO THE FINANCIAL STATEMENTS ............................................... 11
PUBLIC
Page 294 of 392

Page 295

Renfrewshire Council Coats Observatory Trust Fund
Trustees’ Report
P a g e | 1
Trustees’ Report
1. Introduction
Renfrewshire Council acts as sole trustee for the Coats Observatory Trust Fund which has
charitable status and is registered with the Office of the Scottish Charity Regulator (OSCR):
The financial statements of the Trust are included in this report:  
The principal address of the Trust Fund is:
Renfrewshire Council
Finance and Resources
Renfrewshire House
Cotton Street 
Paisley
PA1 1JB
Renfrewshire Council administers the Trust Fund and separately accounts for it. Renfrewshire
Council was established by the Local Government (Scotland) Act 1994 and came into being on 1
April 1996. The Council provides a wide range of public services such as education, children’s social
services, environmental services, council housing and economic regeneration. 
The Trust Accounts do not form part of Renfrewshire  Council’s single entity balance sheet, although
under s222 of the Local Government (Scotland) Act 1973, the property of the Trust “vest[s] in” the
relevant local authority. However, the Trust Fund accounts are included within the group accounts of
the Council. A copy of the group accounts can be obtained from the address above, or on the
Council’s website at www.renfrewshire.gov.uk. 
Independent Auditors:  Azets
Quay 2
139 Fountainbridge
Edinburgh
EH3 9QG
Trustees
Guidance provided by OSCR indicates that those who have “general control and management” of
the charity are the charity trustees. Decisions regarding the general control and management of the
Trust Fund are made by the Finance, Resources and Customer Services Policy Board (FRCSPB),
which has delegated authority from the Council in this regard; but ultimately control rests with the full
Council of elected members. We have therefore interpreted the above guidance as meaning that all
elected members of Renfrewshire Council are charity trustees. 
The following individuals were the Trustees of the Trust Fund in their capacity as elected members
of Renfrewshire Council during the 2025/26 financial year:
PUBLIC
Page 295 of 392

Page 296

Renfrewshire Council Coats Observatory Trust Fund
Trustees’ Report
P a g e | 2
Jennifer Adam Neill Graham Jamie McGuire
Fiona Airlie-Nicolson John Gray Marie McGurk
Stephen Burns Anne Hannigan Iain McMillan
Jacqueline Cameron John Hood John McNaughtan
Lorraine Cameron Lisa-Marie Hughes Kevin Montgomery
Michelle Campbell Robert Innes Sam Mullin
Graeme Clark Alec Leishman Will Mylet
Carolann Davidson Bruce MacFarlane Iain Nicolson
Eddie Devine James MacLaren Jim Paterson
Andy Doig Kenny MacLaren Emma Rodden
Audrey Doig Mags MacLaren John Shaw
Alison Ann-Dowling Colin McCulloch Ben Smith
Chris Gilmour Janis McDonald Andy Steel
Edward Grady Cathy McEwan
Gillian Graham David McGonigle
Day to day management of the Trust Fund is delegated to the Director of Finance and Resources of
Renfrewshire Council. All of these trustees are normally elected or re-elected at local government
elections. By-elections are held to elect new members in the event of existing members vacating
their position. New members automatically become trustees of this fund. 
2. Structure, Governance and Management
The Coats Observatory Fund was inherited by the local authority in early 1963 from the Paisley
Philosophical Society. The Council, as trustees, owns the buildings comprising the Coats
Observatory. These buildings are leased to OneRen at nil consideration.
History
The original purpose of the Trust when it was set up was: “for the upkeep of Coats Observatory
equipment”. This purpose was relevant while there were cash funds available; however these funds
have been exhausted, and only the property assets remain.
Governance and Management
The Council is required to make arrangements for the proper administration of its financial affairs
and to secure that one of its officers has the responsibility for the administration of those affairs. The
Director of Finance and Resources has been designated as that officer in Renfrewshire Council.
They manage the affairs of the Council to secure the economic, efficient and effective use of
resources and safeguard its assets and those of any charitable trust it controls. Given the Trust
Fund is controlled by the Council, these specific provisions are supplemented by general provisions
relating to the administration of local authority monies, i.e. the duty to obtain best value.
The Director of Finance and Resources has responsibility for ensuring an effective system of
internal financial control is maintained and operated. This system of internal financial control can
only provide reasonable and not absolute assurance that assets are safeguarded, transactions are
recorded and properly authorised, and that material errors or irregularities are either prevented or
would be detected within a timely period. The system of internal financial control is based on a
PUBLIC
Page 296 of 392

Page 297

Renfrewshire Council Coats Observatory Trust Fund
Trustees’ Report
P a g e | 3
framework of regular management information, financial regulations, administrative procedures and
a system of delegation and accountability. 
The Director of Finance and Resources is responsible for keeping proper accounting records which
are up to date and which ensure that the financial statements comply with the Charities Accounts
(Scotland) Regulations 2006(as amended) and Accounting and Reporting by Charities: Statement of
Recommended Practice applicable to charities preparing their accounts in accordance with the
Financial Reporting Standard for Smaller Entities published on 16th July 2014. 
Decisions regarding the operation, assets, processes or policies of the Trust Fund are delegated by
the Council to the Finance, Resources and Customer Services Policy Board (FRCSPB). 
Risk
The Trustees have overall responsibility for the Trust Funds’ system of internal control. This system
is designed by senior management to ensure effective and efficient operation, including financial
reporting and compliance with laws and regulations. The Trustees acknowledge that such a system
is designed to manage rather than eliminate the risk of failure to achieve business objectives and
can only provide reasonable and not absolute assurance against material misstatement or loss.
3. Financial Review
The Trust Fund has no explicit reserves policy. The Trust Fund is not in deficit and no donations to
the Fund are solicited. Since 2021, the assets of the Trust have been under refurbishment as part of
the Paisley Museum Reimagined project, funded by Renfrewshire Council. This is disclosed within
the Statement of Financial Activities.
4. Future Plans
Given there are no cash funds remaining, nor are any anticipated, the Council will explore with
OSCR the future of the charity, always considering the ongoing sustainability of the Observatory and
ensuring appropriate governance arrangements remain in place. The £45m Paisley Museum
Reimagined project will create a new, world-class museum space, shaped by and for the people of
Paisley. As part of this project, expected to complete in 2025, the Observatory is currently under
refurbishment and will open to the public with improved accessibility upon completion. A full
revaluation of the Observatory will be carried out when it is reopened.
The Trustees wish to thank the Renfrewshire Council officers involved in producing the Report and
Financial Statements.
Signed:
Alastair MacArthur 
Director of Finance and Resources
Renfrewshire Council
Date: 
On behalf of the Trustees:
Councillor John Shaw 
Convener – Finance, Resources and
Customer Services Policy Board
Renfrewshire Council
Date:       
PUBLIC
Page 297 of 392

Page 298

P a g e | 4
Independent auditor’s report to the trustees of Coats
Observatory Trust Fund and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
We certify that we have audited the financial statements in the statement of accounts of
Coats Observatory Trust Fund for the year ended 31 March 2026 under Part VII of the Local
Government (Scotland) Act 1973 and section 44(1)(c) of the Charities and Trustee
Investment (Scotland) Act 2005. The financial statements comprise the Statement of
Financial Activities, Statement of Balances and notes to the financial statements, including
significant accounting policies. The financial reporting framework that has been applied in
their preparation is applicable law and the United Kingdom Accounting Standards, including
Financial Reporting Standard 102 The Financial Reporting Standard applicable in the UK
and Republic of Ireland (United Kingdom Generally Accepted Accounting Practice).
In our opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the charity as at 31 March 2026
and of its incoming resources and application of resources for the year then ended;
• have been properly prepared in accordance with United Kingdom Generally
Accepted Accounting Practice; and
• have been prepared in accordance with the requirements of the Charities and
Trustee Investment (Scotland) Act 2005, and regulation 8 of The Charities Accounts
(Scotland) Regulations 2006.
Basis for opinion
We conducted our audit in accordance with applicable law and International Standards on
Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the
Accounts Commission for Scotland. Our responsibilities under those standards are further
described in the auditor’s responsibilities for the audit of the financial statements section of
our report. We are independent of the charity in accordance with the ethical requirements
that are relevant to our audit of the financial statements in the UK including the Financial
Reporting Council’s Ethical Standard, and we have fulfilled our other ethical responsibilities
in accordance with these requirements. We believe that the audit evidence we have
obtained is sufficient and appropriate to provide a basis for our opinion.
Conclusions relating to going concern basis of accounting
We have concluded that the use of the going concern basis of accounting in the preparation
of the financial statements is appropriate.
Based on the work we have performed, we have not identified any material uncertainties
relating to events or conditions that, individually or collectively, may cast significant doubt on
the charity’s ability to continue to adopt the going concern basis of accounting for a period of
at least twelve months from when the financial statements are authorised for issue.
PUBLIC
Page 298 of 392

Page 299

P a g e | 5
Responsibilities of the trustees for the financial statements
The trustees are responsible for the preparation of financial statements that give a true and
fair view in accordance with the financial reporting framework, and for such internal control
as the trustees determines is necessary to enable the preparation of financial statements
that are free from material misstatement, whether due to fraud or error.
In preparing the financial statements, the trustees are responsible for assessing the
charity's ability to continue as a going concern, disclosing, as applicable, matters related to
going concern and using the going concern basis of accounting unless the trustees intend to
discontinue the charity's operations, or have no realistic alternative but to do so.
Auditor’s responsibilities for the audit of the financial statements
Our objectives are to obtain reasonable assurance about whether the financial statements
as a whole are free from material misstatement, whether due to fraud or error, and to issue
an auditor’s report that includes our opinion. Reasonable assurance is a high level of
assurance, but is not a guarantee that an audit conducted in accordance with ISAs (UK) will
always detect a material misstatement when it exists. Misstatements can arise from fraud or
error and are considered material if, individually or in the aggregate, they could reasonably
be expected to influence the economic decisions of users taken on the basis of these
financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations.
We design procedures in line with our responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include:
• using our understanding of the local government sector and charity sector to identify
that the Local Government (Scotland) Act 1973, the Charities and Trustee
Investment (Scotland) Act 2005, and The Charities Accounts (Scotland) Regulations
2006 are significant in the context of the charity;
• inquiring of management and those charged with governance as to other laws or
regulations that may be expected to have a fundamental effect on the operations of
the charity;
• inquiring of management and those charged with governance concerning the
charity’s policies and procedures regarding compliance with the applicable legal and
regulatory framework;
• discussions among our audit team on the susceptibility of the financial statements to
material misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate competence
and capabilities to identify or recognise non-compliance with laws and regulations.
The extent to which our procedures are capable of detecting irregularities, including fraud, is
affected by the inherent difficulty in detecting irregularities, the effectiveness of the charity’s
controls, and the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities
that result from error as fraud may involve collusion, intentional omissions,
misrepresentations, or the override of internal control. The capability of the audit to detect
fraud and other irregularities depends on factors such as the skilfulness of the perpetrator,
PUBLIC
Page 299 of 392

Page 300

P a g e | 6
the frequency and extent of manipulation, the degree of collusion involved, the relative size
of individual amounts manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements
is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of our auditor’s report.
Reporting on other requirements
Other information
The trustees are responsible for the other information in the statement of accounts. The
other information comprises the Trustees’ Annual Report. 
Our responsibility is to read all the other information and, in doing so, consider whether the
other information is materially inconsistent with the financial statements or our knowledge
obtained in the course of the audit or otherwise appears to be materially misstated. If we
identify such material inconsistencies or apparent material misstatements, we are required
to determine whether this gives rise to a material misstatement in the financial statements
themselves. If, based on the work we have performed, we conclude that there is a material
misstatement of this other information, we are required to report that fact. We have nothing
to report in this regard.
Our opinion on the financial statements does not cover the other information and we do not
express any form of assurance conclusion thereon except on the Trustees’ Annual Report
to the extent explicitly stated in the following opinion prescribed by the Accounts
Commission.
Opinions prescribed by the Accounts Commission on the Trustees’ Annual Report
In our opinion, based on the work undertaken in the course of the audit, the information
given in the Trustees' Annual Report for the financial year for which the financial statements
are prepared is consistent with the financial statements and that report has been prepared
in accordance with the Charities SORP (FRS 102).
Matters on which we are required to report by exception
We are required by The Charity Accounts (Scotland) Regulations 2006 to report to you if, in
our opinion:
• proper accounting records have not been kept; or
• the financial statements are not in agreement with the accounting records; or
• we have not received all the information and explanations we require for our audit.
We have nothing to report in respect of these matters.
Use of our report
This report is made solely to the parties to whom it is addressed in accordance with Part VII
of the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with
paragraph 108 of the Code of Audit Practice, we do not undertake to have responsibilities to
members or officers, in their individual capacities, or to third parties.
PUBLIC
Page 300 of 392

Page 301

P a g e | 7
Rebecca Lister, (for and on behalf of Azets Audit Services),
Quay 2
139 Fountainbridge
Edinburgh
EH3 9QG
Date:
Azets Audit Services is eligible to act as an auditor in terms of Part VII of the Local
Government (Scotland) Act 1973 
PUBLIC
Page 301 of 392

Page 302

Renfrewshire Council Coats Observatory Trust Fund
Financial Statements
P a g e | 8
Trust Accounts Financial Statements Overview
1. Introduction
The following pages detail the Statement of Financial Activities, the Statement of Balances and
relevant Notes to the Accounts, as required by the Charities Accounts (Scotland) Regulations 2006.
A Cash Flow Statement is not required as the charity is classified as a small charity as defined in the
Charities Statement of Recommended Practice (SORP) and therefore is exempt from producing a
Cashflow Statement. 
2. Statement of Financial Activities
The Statement of Financial Activities provides an analysis of the income and expenditure for the
period. If applicable, the Statement would also show any movements in relation to fixed assets 
3. Statement of Balances
The Statement of Balances reconciles the cash and bank balances at the beginning and end of the
financial year with the surpluses or deposits shown in the Statement of Financial Activities.  The
Coats Observatory is classed as an Asset Under Construction, which means there is a pause in
depreciation until the asset is back in use.
4. Notes to the Accounts
Notes to the accounts expand on or explain the information contained in the Statement of Financial
Activities and the Statement of Balances.
PUBLIC
Page 302 of 392

Page 303

Renfrewshire Council Coats Observatory Trust Fund
Financial Statements
P a g e | 9
Statement of Financial Activities for the year ended 31
March 2026
2024/25 2025/26 
(restated)
Total Note Unrestricted Restricted Total
£ £ £ £
Income
(352,221) Donations from Renfrewshire
Council  2 0 (529,930) (529,930)
Expenditure
0 Governance Costs: External
Audit Fee 2 0 6,760 6,760
(352,221) (Surplus) / Deficit for
period 0 (523,170) (523,170)
Reconciliation of Funds
(1,493,273) Total Funds brought forward 0 (1,845,494) (1,845,494)
(1,845,494) Total Funds Carried
Forward 0 (2,368,664) (2,368,664)
PUBLIC
Page 303 of 392

Page 304

Renfrewshire Council Coats Observatory Trust Fund
Financial Statements
P a g e | 10
Statement of Balances as at 31 March 2026
As at 31
March 2025
As at 31
March 2026
Total Note Unrestricted Restricted Total
£ £ £ £
Fixed Assets
Assets Under Construction
Buildings at Coats Observatory,
Paisley
1,421,073 Opening balance 0 1,773,294 1,773,294
352,221 Additions 1 0 523,170 523,170
1,773,294 Closing balance 0 2,296,464 2,296,464
Other Assets
Land at Coats Observatory,
Paisley
72,200 Opening balance 0 72,200 72,200
0 Additions 1 0 0 0
72,200 Closing balance 0 72,200 72,200
1,845,494 0 2,368,664 2,368,664
Represented By
1,845,494 Restricted Funds 0 2,368,664 2,368,664
1,845,494 0 2,368,664 2,368,664
Signed Signed
Alastair MacArthur Councillor John Shaw
Director of Finance and Resources Convenor – Finance, Resources and
Customer Services Policy Board
Renfrewshire Council Renfrewshire Council
Date       Date        
PUBLIC
Page 304 of 392

Page 305

Renfrewshire Council Coats Observatory Trust Fund
Financial Statements
P a g e | 11
Notes to the Financial Statements
1. Prior Year Restatement
During the year it has been identified that a donated asset of £352,221 received in the prior year and
applied towards the expenditure on capital assets had been incorrectly presented within the
Statement of Financial Activities (SOFA). 
The donation was correctly recognised but the subsequent expenditure was presented as revenue
expenditure within the SOFA. Therefore, the original treatment resulted in £0 movement in reserves
within the SOFA despite reserves increasing by £352,221 in the Statement of Balances for the
increase in the capital asset. 
The comparative figures have been restated to:
• Remove the £352,221 from expenditure relating to Trust Assets;
• Increase the surplus for the year by £352,221.
There is no impact on the value of funds as the transaction had been correctly presented within the
Statement of Balances. 
2. Accounting Policies
Introduction
The Financial Statements for the year ended 31 March 2026 have been prepared in accordance
with the Accounting and Reporting by Charities : Statement of Recommended Practice applicable to
charities preparing their accounts in accordance with the Financial Reporting Standard 102, the
Charities and Trustee Investment (Scotland) Act 2005 and the Charities Accounts (Scotland)
Regulations 2006 (as amended).They are designed to give a true and fair view of the financial
performance and position of the Trust Fund and comparative figures for the previous financial year
are provided. There are no significant departures from accounting standards other than that outlined
specifically below.
The accounting concepts of “materiality” and “going concern” have been considered in the
application of accounting policies. In this regard the materiality concept means that information is
included where the information is of such significance as to justify its inclusion. The accounts have
been prepared on a going concern basis. The going concern concept assumes that the Trustees will
not significantly curtail the scale of the charities’ operations, however it is anticipated that the
Observatory Fund will not continue indefinitely. This has been no impact on the financial statements
as the assets of the Fund comprise solely of the Observatory buildings which are independently
valued.
The accounts have been prepared using the accruals basis whereby total income and expenditure
have been recorded when they were earned or incurred.
The accounts have been prepared under the historic cost convention, other than changes resulting
from the revaluation of certain categories of assets. The following accounting policies used in its
PUBLIC
Page 305 of 392

Page 306

Renfrewshire Council Coats Observatory Trust Fund
Financial Statements
P a g e | 12
preparation have been reviewed following the introduction of Financial Reporting Standard 18
“Accounting Policies” (FRS18). 
Fund Accounting
Unrestricted funds can be used in accordance with the charitable objectives at the discretion of the
trustees. Restricted funds can only be used for particular restricted purposes within the objects of
the charity. Restrictions arise when specified by the donor or when funds are raised for particular
restricted purposes.
Incoming/Outgoing Resources
Recognition of incoming resources
All income is recognised once the charity has entitlement to the income, it is probable that the
income will be received and the amount of income receivable can be measured reliably. 
Recognition of expenditure
All expenditure is accounted for on an accruals basis.
Charitable Activities
Decisions regarding the way the Trust Funds’ income is spent are taken by the Finance, Resources
and Customer Services Policy Board of Renfrewshire Council, whose membership comprises 15 of
the trustees of the Trust Fund. 
Costs of Generating Funds
The cost of administering the Trust Fund is borne entirely by Renfrewshire Council.
Governance Costs
Governance costs, where applicable, include the:
• costs of the preparation and examination of statutory accounts;
• cost of any legal advice to trustees on governance or constitutional matters; and
• cost of administering grants.
Assets
The Fund includes the land and buildings of Coats Observatory, Paisley. The latest valuations were
carried out in 2021/22 for the office and 2020/21 for the observatory. Depreciation is paused due to
the asset being categorised as an Asset Under Construction during the period of refurbishment
(commenced in June 2021) currently underway as part of the Paisley Museum Reimagined project.
Refurbishment spend is disclosed as asset additions in the Statement of Balances. The assets will
be revalued when the refurbishment is complete, anticipated to be during 2026/27. 
3. Analysis of income/expenditure
The refurbishment expenditure recorded as asset additions in the Statement of Balances is funded
by Renfrewshire Council in the form of a grant within the Statement of Financial Activities. The value
of the donation represents an estimate of in-year spend on the Paisley Museum Reimagined project
PUBLIC
Page 306 of 392

Page 307

Renfrewshire Council Coats Observatory Trust Fund
Financial Statements
P a g e | 13
that relates directly to the refurbishment of the Coats Observatory and associated buildings. The
spend was directly incurred by Renfrewshire Council and disclosed as a donation to the Trust.
Renfrewshire Council is responsible for paying any fees incurred by the Trust. The only fee incurred
by the Trust in 2025/26 was the external audit fee. The external audit fee has been recognised as an
expense to the Trust, with the payment made by Renfrewshire Council recognised as a donation to
the Trust.
2024/25 2025/26
Donations from Renfrewshire Council Total Total
£ £
For the refurbishment of Trust assets 352,221 523,170
For the payment of external audit fee 0 6,760
Total Donated Income 352,221 529,930
4. Trustees’ remuneration and expenses
Neither the trustees of the Trust Fund nor any associated person connected with them have
received any remuneration for their services. Further, no directly incurred expenses were
reimbursed to the trustees during the period (nil in 2025/26). 
5. Related parties
During the period, the Council also acted as the banker for the Trust Fund and all transactions,
incoming and outgoing, are made via the Council’s bank accounts. There are no outstanding
balances due to or from Renfrewshire Council nor were there any direct cash transactions during
2025/26.
PUBLIC
Page 307 of 392

Page 308

Page 308 of 392

Page 309

PUBLIC 
To:   Council
On:   24 September 2026
Report by:  Director of Finance and Resources
Heading:  Financial Outlook and Medium-Term Financial Plan
1. Summary
1.1 This report provides the Council with an updated medium-term forecast
financial position, covering the five-year period 2027/28 to 2031/32, and
the key assumptions and risks that underpin it. This update continues
to emphasise the ongoing challenging financial environment for local
government in Scotland and particular issues relevant to Renfrewshire
Council.
1.2 Successive financial outlook reports have highlighted the need for the
Council to continue to develop and deliver significant savings in order
to ensure ongoing financial sustainability, and this is still the case.
However, as the years of financial constraint continue, it is increasingly
difficult for any new savings proposals not to have a significant impact
on service delivery and on the communities that the Council serves.
1.3 This report provides an update on the forecast level of spend and
income over the medium term, and how these combine to provide a
projected recurring financial gap of c£38m by the end of 2031/32. 
1.4 The report outlines how specific reserves may be applied to support the
Council’s financial stability in the short term, and it also provides a
capital update that outlines proposed changes to the current capital
programme.
2. Recommendations
2.1 Note the economic updates outlined in Sections 3 and 4;
Item 6
Page 309 of 392

Page 310

PUBLIC
2.2 Note the key financial assumptions and projected medium-term
revenue position outlined in Section 5;
2.3 Note the savings update and agree the savings targets outlined in
Section 6;
2.4 Note the reserves update and agree the principles outlined in Section
7;
2.5 Note the financial risks to the forecast position outlined in Section 8;
2.6 Note the treasury and debt update provided in Section 9 and the long
term financial planning principles outlined to secure and support future
strategic investment; and
2.7 Note the capital update and approve revisions to the Capital Plan as
outlined in Section 10.
3. Economic outlook and Key fiscal events
3.1 As Members will be aware, there are a number of downside geopolitical
risks that continue to impact public finances, including ongoing conflicts
in Ukraine and the Middle East. This continues to bring volatility and
create uncertainty in global supply chains, and associated costs.
3.2 Twelve-month CPI inflation increased to 2.9% in July, coming from
energy, food and transport. Pay inflation remains high but is expected
to ease over the rest of the year. The Bank of England expects inflation
to rise later in 2026 before returning sustainably towards its 2% target
over the medium term.
3.3 At its July 2026 meeting, the Bank of England's Monetary Policy
Committee (MPC) voted to maintain Bank Rate at 3.75%, deciding that
uncertainty surrounding energy prices and the risk of renewed
inflationary pressures warranted a cautious approach. The Bank Rate
is expected to remain broadly at its current level in the short term.
3.4 Economic growth is expected to remain modest over the next two
years, with UK GDP growth forecast at 1.1% for 2026. While the
Scottish Fiscal Commission's (SFC) latest official forecast projects
Scottish GDP growth of 1.3% in 2026 and 2027, more recent
independent forecasts have revised expectations downward to around
0.8%-0.9%, reflecting the impact of higher energy prices, economic
uncertainty and weaker investment growth. 
Page 310 of 392

Page 311

PUBLIC
3.5 The SFC published its Fiscal Update in August 2026, in which they
note that the outlook for 2027/28 remains considerably challenging for
the Scottish budget. Their forecasts suggest that revenue spending
could fall after taking account of inflation, with capital spending
expected to fall further than planned. While the Scottish Budget has
benefited from additional resource linked to UKG decision on spending
for Special Educational Needs and Disability (SEND) in 2026/27, this
additional resource is one-off. The SFC is forecasting a fall in the real
terms value of the resource block grant in 2027/28 of 1.2%. This may
change depending on UK Government decisions at the UK Budget –
the arrival of a new Prime Minister and Chancellor may change the
previously understood fiscal strategy. 
3.6 Regardless of these, the outlook for the Scottish Budget is challenging.
Additional pressures from the income tax reconciliation mechanism
(outlined by the SFC as costing £720m in 2027/28), ongoing pay and
demand pressures, as well as Scottish Government policy
commitments will all bear on the 2027/28 budget.
4. Scottish Budget 2027/28 and Local Government Finance
Settlement
4.1 The Scottish Government’s Scottish Spending Review (SSR) published
in January 2026 alongside the 2026/27 Scottish Budget set out the
Scottish Government’s indicative revenue spending plans for 2027/28
and 2028/29, with an additional year (2029/30) for capital spend. The
spending review outlined a planned £1.5bn savings target over the
period, underpinned by plans for public sector reform and NHS
efficiencies.  The Programme for Government published on 1
September outlined potential changes to the structure of local
governance in Scotland, with engagement currently ongoing. At the
time of drafting, there is no clear indication as to how any preferred
model may affect the council’s financial position or outlook, therefore no
assumptions have been included. 
4.2 The UK Government Budget has confirmed that the UK Budget will be
announced on 28 October. This typically drives timelines around the
Scottish Budget, and it is expected the Draft Budget will be published
on 3 December. Members will be aware that the Council must agree its
budget and associated council tax decision by 11 March each year.
4.3 Renfrewshire Council’s settlement has benefited in the past year from
the area’s relative growth in population, and this is expected to
continue into 2027/28. 
Page 311 of 392

Page 312

PUBLIC
4.4 The latest population estimate was published in mid-July 2025. This
showed that Renfrewshire’s population increased again and now
stands at 189,270, an increase of 660 (0.3%) on 2024 and above the
national rate of just under 0.1%. This yearly increase is based on a
rebased figure for 2024 which was revised down slightly. Renfrewshire
remains the 9th largest Council in Scotland in terms of population. This
recent population increase places our estimated population at the
highest level recorded since 1980 and continues increases recorded
from the mid-2000s, however the rate of change has slowed
significantly compared to the period following the 2022 census. 
4.5 In terms of what this means at a strategic level: increased population
is generally positive, as people are choosing to move to Renfrewshire,
supporting the local economy, using services and contributing to their
communities. However, in line with the rest of Scotland, Renfrewshire
is experiencing a significantly ageing population, which leads to
demand pressures on health and social care services. This trend is
likely to become more acute as the top end of the working age
population moves into the 65+ cohort.
4.6 The Scottish Government’s January 2026 public sector pay policy
restated the 2025 position of a 9% increase over 2025/26 to 2027/28,
with an annual cap of 3%. The most recent local government pay
settlement agreed was for 4% in 2025/26 and 3.5% in 2026/27. In
recognition of this, the Scottish Government has committed to
reviewing the policy as part of the 2027/28 budget process.
4.7 The Scottish Government has made a number of policy commitments
which will impact on the local government settlement, including a
commitment to reduce class contact time for teachers, expand free
breakfast provision in schools, and extend the rights of care
experienced children under the Children (Care, Care Experience and
Services Planning) (Scotland) Act 2026. A core assumption of this
report is that the financial consequences of these commitments will be
fully funded by the Scottish Government.
5. Medium term forecast position and assumptions
5.1 The most recent financial outlook update reported to Council in
February 2026 covering the period 2026/27 to 2030/31, outlined gross
revenue pressures of c£80million by 2030/31 before any decisions on
council tax. This forecast was based on a number of key assumptions,
which officers continually assess in light of new information. The
updated core assumptions underpinning the forecast position within this
report are outlined in Table 1 below:
Page 312 of 392

Page 313

PUBLIC 
Table 1: Core budget assumptions September 2026   
2027/28 2028/29 2029/30 2030/31 2031/32
Pay award  3.0% 2.5% 2.5% 2.0% 2.0%
Employer Pension
contribution rate (LG
employees)
6.5% 6.5% 6.5% 15.0% 15.0%
Non-pay inflation 0% 0% 0% 0% 0%
Contract inflation 2.0% 2.0% 2.0% 2.0% 2.0%
Revenue Grant 1.0% 0.5% 0.5% 0.0% 0.0%
Council tax (rate) 6.5% 6.5% 6.5% 6.5% 6.5%
Council tax (base) 0.7% 0.8% 0.7% 0.6% 0.6% 
Pay
5.2 The current pay settlement for teaching staff covers the period up to
July 2027 (3.25% from 1 August 2026) and for local government (non-
teaching) staff the agreement until 31 March 2027 was 3.5%. The
assumptions for pay over the medium term are noted above. For
context, each 1% pay award across both the teaching and non-
teaching workforce would cost an estimated £3.5m per year.
5.3 On top of pay inflation, the Council’s pay bill also includes employer
NICs and pension contributions. The Council’s current employer
contribution rate to the Strathclyde Pension Fund is 17.5%, however,
the current triennial valuation process will confirm rates for the next
three-year period. The assumption in this Financial Outlook is that the
17.5% rate will reduce to 6.5% over the next three year triennial
revaluation period. This position is not at the time of drafting confirmed
by Strathclyde Pension Fund, however it is expected the position will be
determined by the end of September. The indication from SPF is that
the long term employer contribution rate is expected to be 15%,
however due to the current well-funded position, the contribution rate
could be reduced to 6.5% in the short to medium term. There remains
uncertainty with this however, and a risk remains for the Council that an
increase back to the longer term rate may be required in 2029/30. In
this case, the Council would require to reinstate the budget back to the
15% rate in a relatively short period of time. This would present a
significant challenge, and it is anticipated that the use of ringfenced
reserves could be required to smooth this position. 
Page 313 of 392

Page 314

PUBLIC
5.4 The employer contribution rate for the teachers’ pension scheme is also
currently the subject of an actuarial valuation, however the formal
position on this is unlikely to be agreed until early 2027. There was a
substantial change in the employer contribution rate in England
following the actuarial revaluation – the rate will reduce from 28.68% to
17.68% from 1 April 2027. The current rate in Scotland is 26%. For the
purposes of this report, it is assumed that any change in the employer
contribution rate will be matched by an equivalent change in revenue
grant funding.
Non-pay costs
5.5 The Council has a long-standing principle of no general inflationary
uplifts being funded, with an expectation that Directors and their
management teams will seek ongoing efficiencies in order to meet
general inflationary pressures. This position has been significantly
tested in recent years as both general inflation (as indicated by CPI)
and construction cost inflation have both breached into double figures.
Utilities in particular have seen large increases in cost; along with road
fuel and costs associated with waste recycling and disposal.
5.6 The pressure on these budgets, along with other above inflation costs
linked to conflicts in Ukraine and the Middle East, has resulted in a
position where some costs have exceeded available budgets despite
the best efforts of officers. This has been particularly prevalent in
Children’s Services transport costs, as well as services delivered by the
Environment, Housing and Infrastructure service; and the resulting
overspends have been robustly scrutinised by relevant Policy Boards. 
5.7 In closing the 2025/26 position, the Council added £1m to its
Unearmarked General Fund balance to address some of this expected
price volatility; however, the Council continues to face a number of
expenditure risks, which are outlined in more detail in section 8 below.
5.8 Owing to revenue spending pressures the Council has had a long
period of only basic buildings maintenance being in place. This has
resulted in a position where the overall condition of the estate is
deteriorating; most pressingly in the schools estate but also across
other areas of public buildings including the leisure estate. The lifecycle
maintenance and repairs budget has been increased over the past two
years to address the scale of backlog and other repairs, and a further
recurring £0.5m could be incorporated for this purpose in 2027/28. 
Page 314 of 392

Page 315

PUBLIC
5.9 The cost of running the local government election in May 2027 is
estimated at £0.6m. As this is non-recurring, it is assumed that this will
be funded from reserves, rather than adding to the recurring base
budget and then removing it in 2028/29.
Education costs
5.10 Members have agreed a learning estate strategy that includes a
business case process to support and inform schools and early
learning estate investment decisions. As reported to the Education and
Children’s Services Policy Board in May 2026, a number of business
cases are underway for the next phase of the programme – Trinity High
School, Johnstone High School, and Johnstone Primary School Estate
projects. In addition, both the expanded Park Mains HS and Thistle PS
will become operational in August 2027. Both teaching and running
costs have been incorporated into forecast spend.
5.11 Following agreement of the 2026/27 budget, a further pressure
emerged around Additional Support Needs demand within schools, with
a £0.2m investment agreed to be funded from reserves, with inclusion
in the base budget from 2027/28. However the scale of this pressure
has escalated during the current year. Renfrewshire Council has a rate
of ASN demand (45% in 2025) that is higher than national average in
Scotland, and the complexity of need means that in many cases a 1:1
support ratio needs to be in place. This pressure will continue to be
closely monitored.
5.12 Across both ASN and mainstream school transport provision, the
budget has come under severe pressure as tendered costs increase
from private providers. Additional budget of £3.6m has been added in
the past 2 years; however, the most recent forecast position for the
2026/27 outlines a further overspend of £0.8m. An additional recurring
budget of £1m has been included in the outlook position for 2027/28.
This means that spend on school transport has practically doubled in 4
years, predominantly linked to cost increases rather than increased
numbers of children travelling. This level of cost increase will be difficult
to contain without impacting on other Council service budgets and
services.  
Borrowing costs
5.13 The Council’s strategic aspirations in terms of the learning estate and
infrastructure (where this is not grant funded) will require to be
appropriately resourced in the revenue budget to support prudential
borrowing and revenue contributions to capital. 
Page 315 of 392

Page 316

PUBLIC
This issue is outlined in more detail in section 9 below, however the
forecast position includes an increase in loans fund costs each year for
the full forecast period – potentially taking the ratio of debt to net
revenue stream from 2.9% to 5.3%. This approach will provide the
Council with the ability to lock in capital investment capacity to support
long-term strategic investment planning. 
Income
5.14 The Scottish Government’s MTFS indicates an average 2.7% cash-
terms increase to the local government settlement over the period of
the plan. However, the MTFS, similar to the Council’s plans, shows a
deficit position. Therefore, the Scottish Government will need to make
savings or reduce planned spend over this period, potentially adjusting
its expenditure plans to remain within available resource. On balance,
the Council’s base forecast for revenue grant is therefore ‘flat-cash’.
Given the scale of the budget gap projected by the Scottish
Government, this forecast may be on the optimistic side, and this
position will be kept under close review. The Council should however
benefit in terms of distribution from an overall increase in share of the
Scottish population.
5.15 In relation to council tax, Council previously agreed a core assumption
of 6.5% increases for the remainder of the current administration
period, noting that this decision would be for Council to take on an
annual basis when setting each budget. This assumption remains the
case across the five-year period covered here. Members will be aware
that council tax is a key element of agreeing a balanced budget, so
some variation from this core assumption is likely, depending on how
other areas of spend and income move.
5.16 In setting the 2026/27 budget, an ongoing level of income from DEFRA
in relation to the PackUK waste disposal packaging scheme was
baselined. In recognition that this income may reduce over time as
suppliers produce less packaging, there is an assumed 5% reduction in
this income stream each year within the outlook position.
5.17 The Council has agreed to develop a Visitor Levy scheme proposition
for Renfrewshire. While the Council has yet to make a formal decision
as to whether to introduce the levy, given the statutory timescales
involved around consultation and implementation, the likely earliest
date for potential implementation would be April 2029. Within the
outlook position, a new income stream of (prudently) £1m, which is net
of administrative costs, has been included in 2029/30. 
Page 316 of 392

Page 317

PUBLIC
It is expected a proportion of this funding will require to be invested in
visitor related services and infrastructure.
5.18 Council officers will continue to work towards a principle of full cost
recovery for services, setting fees and charges in line with this
principle. An increase of 5% per annum has been in place for a number
of years and this level is assumed to continue over the medium term.
Officers will also explore other options for increasing income, or
introducing new income streams, such as the visitor levy.
Gross revenue position
5.19 The cost assumptions above result in the projected revenue position
outlined in Table 2 over the next 5 years i.e. before any decisions on
further savings, but inclusive of an assumed level of council tax
increase in line with the core assumptions in Table 1 above.
Table 2: Summary medium term forecast
Summary medium term forecast -
September 2026 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32  
£m £m £m £m £m £m
Opening base budget gap/(surplus) (3.2) (6.9) (3.5) 5.3  12.7  29.9 
New pressures:          
Pay 15.4  10.7  9.3  9.3  17.9  7.8 
Non-pay 14.8  10.1  9.1  8.5  7.0  6.0 
Borrowing 5.3  5.0  3.5  3.5  3.5  4.5 
Asset maintenance 1.5  0.5         
Gross pressures 33.8  19.5  18.4  26.5  41.1  48.2 
Savings:          
Fees & Charges 5% (0.3) (0.3) (0.3) (0.4) (0.4) 0.6 
Council Tax base increase (0.6) (1.0) (1.1) (1.1) (0.9) (1.0)
Corporate and service savings (2.5) (10.6) (2.9) (3.1) (1.8) (1.0)
Total Savings (3.4) (11.9) (4.3) (4.5) (3.1) (1.4)              
Sub-Total 30.4  7.6  14.0  22.0  38.0  46.8 
Increase in SG revenue grant (23.9) (3.7) (1.9) (1.9) 0.0  0.0 
Baseline EPR funding (4.4) 0.2  0.2  0.2  0.2  0.2 
Budget gap prior to CT decision 2.1  4.1  12.4  20.3  38.1  47.0 
CT increase (6.5% from 27/28) (9.2) (8.6) (8.2) (8.8) (9.4) (10.1)
CTR requirement  1.0  1.1  1.2  1.2  1.3 
Recurring budget gap/(surplus) (7.1) (3.5) 5.3  12.7  29.9  38.2 
Recurring Motion Investment 0.2  0.0  0.0  0.0  0.0  0.0 
Net recurring budget gap/(surplus) (6.9) (3.5) 5.3  12.7  29.9  38.2 
Agreed one-off spend 7.9  0.0  0.0  0.0  0.0  0.0 
Use of reserves 1.0  (3.5) 5.3  12.7  29.9  38.2 
Page 317 of 392

Page 318

PUBLIC
5.20 The position for the current financial year is shown for information;
however, it can be seen that the Council has agreed a budget that
returned to a positive recurring financial balance in 2026/27.
5.21 While the return to a recurring balanced position in 2026/27 is positive,
without further substantial savings being delivered, a financial gap is
projected for 2028/29 of £5m, increasing to £38m by 2031/32. For
clarity, this is after the assumed council tax increases in Table 1 above.
It is also worth highlighting, the above analysis makes no provision for
additional financial support to Renfrewshire IJB – this financial risk is
explored in further detail in section 8 below.
5.22 The Council will have choices in how to address the financial gap,
however these will essentially be restricted to three main themes:
reduce planned spend (specifically, that spend which is within the
Council’s control); generate savings to offset the forecast increase in
cost; or increase income. For context, each 1% increase in council tax
generates c£1.1m. The most likely solution will be a combination of all
three.
5.23 There would also be a short-term option in terms of utilising reserve
balances to temporarily close the gap, however the underlying financial
gap would remain to be addressed on a recurring basis. As has been
discussed in many previous reports, the use of reserves to achieve
financial balance can only ever be a short-term option, which should
only be agreed in circumstances where planned and agreed recurring
savings, required to achieve recurring balance, cannot be delivered in
line with the financial gaps emerging. These issues are explored in
further detail below.
6 Savings
6.1 Previous financial updates have outlined the measures the Council has
taken to deliver substantial savings in recent years from transformation
programmes, financial sustainability workstreams and corporate
financing measures such as adjustments to the Council’s long term
debt smoothing strategy.
6.2 Action taken by the Council since 2011/12 has generated substantial
levels of saving totalling £193m, however as has been reported
previously, in each successive year it is increasingly difficult to continue
to generate savings at scale. From an average saving of £19.5m per
annum in the period from 2011/12 to 2014/15, the average saving over
2022/23 to 2026/27 was £5.8m. 
Page 318 of 392

Page 319

PUBLIC
As outlined above however, without continuing significant levels of
saving being generated, there is a risk the Council will not remain
financial sustainable. There is a significant anticipated saving in
2027/28 linked to the reduction in the employer pension contribution
rate outlined at 5.3 above, estimated at £8-9m. 
6.3 As outlined in the most recent Reshaping Renfrewshire report, key
areas of focus for the Council in terms of transformation will be: to
reshape how we use council assets, reimagining the role they serve
within our communities; to drive long term economic growth and
address the climate transition journey; to develop our strategic
partnerships to support delivery of shared goals; and to secure a digital
agenda that drives the delivery of large-scale savings whilst also
transforming how we work, how we use data to inform our decisions,
and improve our service delivery to, and choice for our citizens.
6.4 In respect of the digital agenda specifically, it has been recognised that
artificial intelligence may provide substantive potential for service
change. The Council is concluding the appointment of a supplier to
support the Council’s AI Transformation Programme. Regular updates
on the AI Transformation Programme will be reported to the Leadership
Board at key points throughout the programme, including a six-monthly
‘AI Transparency Report’ outlining the AI tools used by the Council, the
purpose, and function of each system, any data-protection or equality
assessments undertaken, changes since the previous report, and any
identified risks, mitigations or recommendations for future deployment. 
6.5 The phasing of resulting financial savings is included in the forecast
outlook position, from 2028/29 to 2030/31, targeting c£4.8m in total.
This is net of anticipated recurring costs. The delivery of these savings
is also predicated on a requirement for short-term investment to
facilitate the transformational change necessary, and the Council
maintains a Service Modernisation Fund for this purpose. Savings
delivery on this scale is contingent on wide adoption of AI technology
across services, and robust vacancy management as services take
advantage of the service reconfiguration possible through the use of AI.
6.6 A recurring financial gap remains over the medium term, meaning
further work will be required to secure the Council's long-term financial
sustainability. The savings identified within this report should therefore
be viewed as an initial programme, with additional proposals to be
developed as the financial outlook becomes clearer. In the shorter
term, reserve balances may be required to support financial stability
while longer-term solutions are implemented.
Page 319 of 392

Page 320

PUBLIC
7 Reserves
7.1 The planned use of reserves as a support to the Council’s medium-
term financial position has been outlined in previous reports as likely to
be required; and the analysis above clearly demonstrates this
requirement over the medium term. The application of reserves is a
legitimate tool in managing temporary financial challenges and securing
immediate financial stability while the design and delivery of well-
managed sustainable savings are generated to match financial
pressures; it cannot, however, be more than a short-term measure.
7.2 In summary, the Financial Sustainability reserve will be the prime
source of financial stability support over the medium term. The balance
on this reserve coming into 2026/27 was £35.8m. Delays with the
achievement or non-achievement of savings will require to be
supported through the application of this reserve.
7.3 Members should continue to recognise the risk that savings may be
delayed or deliver less benefit than anticipated, and should prudently
plan for this eventuality. In addition, Members’ attention is drawn to the
significant financial risks outlined in section 8 of this report, in particular
the ongoing risk posed by the financial outlook of Renfrewshire HSCP.
7.4 While there remain uncertainties in much of the analyses above, it is
helpful to reiterate previously agreed principles in terms of the planned
use of specific reserves which could be deployed to support the
Council’s medium- term financial position, namely that: 
o There should be no planned use of unallocated reserves, which are
held as a risk contingency (however the Council took a deliberate
decision to increase unallocated balances by £1m in closing 25/26
in recognition of specific cost volatility – up to £1m therefore could
be applied in 26/27 to fund known pressures);  
o Unallocated reserves should be maintained at a minimum of £10m
(c2.0% of net running costs) over the medium term; and
o The Council commits to the planned use of the Financial
Sustainability reserve to support the medium-term financial position,
and in the interim, develops and implements plans to address the
forecast structural financial gap in a sustainable manner. 
Page 320 of 392

Page 321

PUBLIC
7.5 Updated revenue outlook reports will continue to be provided to future
Council meetings, including the annual budget setting meeting,
incorporating the confirmed level of Scottish Government revenue
support in 2027/28, plus any revised financial assumptions and any
variation in the requirement to utilise ring-fenced reserve balances from
that outlined here.
8 Risk management
8.1 The most recent financial overview report to the Finance, Resources
and Customer Services Policy Board outlined a projected revenue
overspend in 2026/27 of £6.0m. This includes a projected overspend
with Adult Social Care services managed by Renfrewshire IJB of
£5.1m; with remaining Council services therefore projecting an
overspend of £0.9m.
8.2 There are a number of financial risks which the Council is facing in-year
that have the potential to significantly affect the forecast outturn
position outlined above:
i. Pay inflation - Provision has been made in the budget for a level of
pay uplifts based on affordability, and the prospect of reducing
inflation; however, given current economic volatility, there is some
likelihood that this provision will be insufficient. Any costs over and
above budgeted levels will require to be funded from reserve
balances in-year, with adequate provision requiring to be made in
future budgets.
ii. Reduced class contact time – the Scottish Government has outlined
its intention to reduce teacher class contact time from 22.5 hours to
21 hours per week, starting with primary schools from August 2027.
Officers in Children’s Service are currently developing plans,
however early indications are that the additional cost could be in the
order of £3-4m per annum. The working assumption is that this will
be fully funded by the Scottish Government as a new burden;
however, this is yet to be fully confirmed on a recurring basis. One-
off preparatory work funding will be made available to councils
during 2026/27.
iii. Renfrewshire IJB – as has been previously reported to members,
Renfrewshire IJB continues to face significant cost pressures, with
the June report to the IJB outlining a projected year end overspend
of £5.1m for 2026/27. A recurring financial gap of c£12m is forecast
for 2027/28, some of which could be offset through the applications
of remaining reserves. 
Page 321 of 392

Page 322

PUBLIC
IJB officers continue to implement savings through the Sustainable
Futures plan, with a number of service changes being required to
mitigate the projected overspend. This work is ongoing, however
the difficulties in securing recurring savings at the scale required is
not to be underestimated. For Adult Social Care alone, pay inflation
averages £0.950m per year for the next 5 years.    In addition,
based on the report to the IJB in March 2026, it is estimated that
IJB reserve balances will be fully exhausted during 2027/28,
potentially requiring both the Council and NHS Greater Glasgow &
Clyde to provide significant additional support. Council officers
continue to engage regularly with IJB officers to ensure appropriate
visibility of the forecast position. Members will be aware that in
terms of risk scoring, the Council, similar to all councils across the
country, now has IJB financial sustainability as its highest financial
risk given the potential for this issue to impact severely and directly
on the Council’s financial stability.
iv. Waste Disposal Costs – the Council deals with multiple streams of
recyclate disposal on a daily basis, and contracts with suppliers to
collect and process this waste. Many of these waste streams have
generated income for the Council in past years, but currently the
majority present a significant cost to the Council. The position,
however, is subject to frequent change, linked to global supply
chain needs, leading to market sensitivity. Consequently, a further
recurring sum is not recommended in the base budget; rather
Members are asked to approve the principle that adverse
fluctuations in these costs can be managed by drawing on the
Financial Sustainability Fund, if there is no available capacity in the
in-year service revenue budget. The proposed development of a
transfer station as outlined below would help mitigate this financial
risk, but not extinguish it.
v. The Children (Care, Care Experience and Services Planning)
(Scotland) Act 2026 received Royal Assent on May 15, 2026,
following approval by the Scottish Parliament. Its provisions extend
accommodation support and continuing care for care experienced
individuals up to age 26 in certain circumstances. It is assumed
within the medium term outlook position that new burden funding
will be forthcoming from the Scottish Government to support
additional costs arising from these new requirements. 
Page 322 of 392

Page 323

PUBLIC
vi. Savings delivery - Directors and their management teams continue
to try to manage as efficiently and effectively as possible within a
highly constrained financial envelope; however this is becoming
increasingly difficult following 15 years of savings delivery at scale
and a continually volatile financial environment. This increased level
of financial risk further supports the requirement to hold a prudent
level of unallocated reserves.
9 Treasury management and debt
9.1 The medium term forecast position outlined in the sections above
contain an assumed increase in the funding required to support
borrowing which is a prerequisite to ensuring the Council’s ambitious
capital plans remain affordable and financially sustainable. It will be
critical for the Council to understand not just the capital costs
concerned and the risks inherent in managing these (see section 10
below); but also in ensuring that the revenue consequences of that
investment are affordable and are appropriately provided for within
council revenue plans.
9.2 Prior to agreeing any capital project; and as has been explicitly
approved in the context of the learning estate strategy, the Council
must as part of its business case gateway process ensure that
appropriate provision has been made in future revenue plans to fund
both borrowing costs and any increased operational costs resulting
from capital investment.
9.3 It is recognised that increased investment in the council’s asset base is
both desirable and essential, however investment decisions must be
taken in the context of the current constrained financial environment.
Increases in revenue support for borrowing will inevitably result in
choices between capital investment and dealing with ongoing service
pressures and priorities. Any increase in property related costs should
aim to be mitigated by rationalisation in the size of the council’s
property portfolio – in line with the principles of the property asset
management strategy. A reduced number of better condition buildings
from which to deliver services should remain the aspiration.
9.4 Members have been advised previously that the Council has one of the
lowest debt-to-revenue spend ratios in Scotland. The ratio at the end of
2025/26 was 2.8%, whereas the Scottish average sits around 6%.
There is no target rate; this is determined by a range of factors around
historic levels of investment, historic borrowing rates, timing of
investment decisions, and other non-financial factors such as overall
estate condition and local priorities. 
Page 323 of 392

Page 324

PUBLIC
This low rate does not mean that we have excess funds available, as
what the Council is not spending on serving debt, it is spending on
delivering services. This is very important to understand moving
forward. Given there is a clear aspiration to improve the estate, this will
mean less revenue funding available for service delivery.
9.5 Supporting substantial future capital spend (and therefore borrowing)
requires a commitment from the Council over a long period to prioritise
revenue provision for loan charges as a core principle of its budget
strategy. Steadily increasing loans fund budgets in this way locks-in
revenue resources as part of financial planning to provide certainty of
future borrowing capacity, and also generates short-term investment
from CFCR contributions in advance of new loan charges commencing,
thereby increasing the overall capital funding available.
9.6 The Council’s 2026/27 budget was agreed incorporating an increase in
provision for borrowing costs of £3.0m; with a further commitment of
similar increases in future years. Setting aside funding at least on this
scale will be a precursor for any decisions for further at scale
investment in the property estate. This is both required over the
remainder of the current Council administration term in order to
underpin the learning estate strategy but will also need to be
established as a fixed feature of the Council’s very long term financial
planning arrangements to secure ongoing investment capacity over the
next 20 years. The outlook position assumes a baseline of additional
loan charges provision of £2.5m per year.
9.7 Successive treasury management reports to Council have outlined that
the Council’s borrowing strategy is to firstly use internal cash balances
to fund the capital investment programme. This strategy remains,
however internal cash balances have been depleted, and it is likely that
external borrowing will be required in the medium term. Any external
borrowing will be undertaken in line with the Council’s agreed treasury
strategy. The current relatively high interest rate environment will be an
influence on the timing of borrowing decisions, however there may be
circumstances where the Council requires to borrow externally in the
relative short term, potentially increasing costs in that period.
10 General Fund Capital Programme
10.1 The Council continues to deliver its ambitious capital programme,
incorporating the delivery of significant investment in cultural venues
and wider infrastructure linked to City Deal projects and Levelling Up
Funding; as well as major improvement and expansion projects in the
school estate.
Page 324 of 392

Page 325

PUBLIC
10.2 Council has agreed its learning estate strategy which continues this
level of ambition over the medium to longer term; with an initial planned
spend in the order of £170m over the initial phase of the strategy. With
early business cases underway for this phase, and construction
inflation a considerable factor over time, it is becoming apparent that
this sum will be insufficient to support the Council’s ambitions, and
therefore work is ongoing to assess what additional borrowing capacity
will be required going into the 2027/28 financial year.
10.3 An outline business case for a new waste transfer station was
approved at the August meeting of the Infrastructure, Land and
Environment Policy Board. An estimate of just under c£6m total cost is
included in the recommended development option. To fund this, the
Board also agreed to recommend the drawdown of £3.6m from the
Financial Sustainability Fund to support this capital investment and that
the remaining capital cost is funded from prudential borrowing. It should
be noted that this early estimated cost is subject to change as the final
business case is progressed, however it is recommended that the
Capital Plan is updated to reflect this investment.
10.4 Members should remain alert to the fact that major capital investment
projects bring an inherent level of financial risk and further costs may
emerge as they are delivered and contractually concluded. It remains
possible that costs may be incurred in excess of agreed budgets within
the existing capital plan given the scale and nature of the Council
capital programme and growing incidence within the construction
industry of contractors pursuing contractual claims, reflecting the
ongoing financial pressures and volatility being experienced. 
10.5 Where budgets are expected to be exceeded, appropriate approval will
be sought to adjust the capital plan to reflect these costs with any
consequential impact on the overall capital plan or revenue
consequences being clearly articulated.
Implications of the Report
1. Financial – the report highlights the scale of the short and medium
term financial challenge the Council faces. The development and
implementation of savings options at pace and scale will be critical to
the ongoing financial sustainability of the Council. The report indicates
a projected recurring financial gap of c£38m by the end of 2031/32.
2. HR & Organisational Development – the medium term financial
position and associated savings plans require to align with workforce
plans to ensure the size and composition of the workforce remains
Page 325 of 392

Page 326

PUBLIC
appropriate and affordable.
3. Community/Council Planning – the Council requires to remain
financially sustainable in order to deliver on its priorities as outlined in
the Community and Council plans; and these plans in turn require to
inform the financial strategy.
4. Legal – the Council is legally required to set a balanced budget.
5. Property/Assets – the report outlines investment that aims to ensure
the Council’s property asset base is efficient and properly maintained.
6. Information Technology – the report outlines the digital agenda,
including AI, as a critical factor in the delivery of future savings,
efficiencies and improved customer service.
7. Equality & Human Rights - The recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report, however
the report highlights the need for the Council to continue to make
substantial savings which may impact on service delivery. Each
savings proposal will be individually assessed for any impact on
equalities and human rights.
8. Health & Safety – none arising directly from this report.
9. Procurement – none arising directly from this report.
10. Risk – as outlined in the report the Council’s financial sustainability
risk remains relatively high, and increased in the short term due to the
potential financial implications arising from the Renfrewshire IJB’s
financial outlook.
11. Privacy Impact – none arising directly from this report.
12. Climate Risk – none arising directly from this report.
13. Children’s Rights – none arising directly from this report.
14. Cosla Policy Position – none arising directly from this report.
Author: Alastair MacArthur, Director
Page 326 of 392

Page 327

1 
PUBLIC 
To:  Council 
On:  24 September 2026 
Report by: Chief Executive 
Heading:      Public Service Reform
___________________________________________________________________ 
1. Summary  
1.1 On 1 September 2026, the First Minister presented the Scottish Government’s
Programme for Government 2026-2031.  The Programme for Government notes
the significant challenges facing Scotland public services including increased
costs, complexity and demand for services across the population. It sets out a
range of proposals to “rewire” public services in Scotland by reducing the number
of public bodies that are operating across the country and specifically reducing the
number of health boards from 14 to two. 
1.2 Linked to these proposals, the First Minister also set out proposals to reform local
governance arrangements more broadly, and to consider the implications for the
provision of social care. 
1.3 At present, detailed information has not yet been provided on the specific nature
of the reform proposals although the Government have indicated they are
currently considering how best to set this out and share this with COSLA and the
wider local government community.  A rapid period of engagement is also
proposed by the Scottish Government over the next 3 months with relevant
stakeholders. Initial information relating to the proposed engagement
methodology in relation to local governance reform was shared with the Council
Chief Executive on 15th September 2026.  Elected members are asked to consider
the invitation to engage as outlined at Section 4.3, and to advise the Chief
Executive on the response to be provided to the Scottish Government. 
Item 7
Page 327 of 392

Page 328

2 
PUBLIC 
1.4 Notwithstanding the engagement proposed, it is recognised that there will be an
ongoing requirement to provide regular updates to the Leadership Board on the
implications of any proposed reforms as further information becomes available. 
Elected members are asked to note that should time limited responses be required
to any consultation and engagement processes being undertaken by the Scottish
Government on reform proposals, a special meeting of the Leadership Board may
need to be held to allow elected members to agree a formal response. 
1.5 We are also committed to keeping our employees informed as details emerge, as
well as to sharing information with communities and citizens in relation to the
potential implications of reform proposals.
1.6 
_____________________________________________________________________ 
2. Recommendations 
2.1      It is recommended that Elected Members:
I. Note the content of the report. 
II. Consider the request received from the Scottish Government on 15th
September for the Council to participate in the Scottish Government’s
engagement process as set out in section 4.3.
_____________________________________________________________________ 
3. Programme for Government – Public Services Reform agenda 
3.1 On 1 September 2026, Scottish Government published its Programme for
Government 2026-2031.  The Programme for Government sets out four
overarching priorities: eradicating child poverty, growing the economy, tackling the
climate emergency and delivering high-quality and sustainable public services. 
3.2 There are a range of commitments within the Programme for Government which
require direct local authority support to deliver, including in relation to housing and
homelessness, education and childcare, economic development, community
wealth building, climate adaptation, prevention and public service delivery. 
3.3 In terms of “public service delivery”, the Programme for Government outlines
several specific areas of focus which, depending on the scale and nature of
implementation, may have a significant impact on the role and delivery of public
services in Scotland.  The document notes the significant challenges facing
Scotland public services including increased costs, complexity and demand for
services across the population, and sets out an ambition to 'rewire the state'
around people rather than institutions, reduce duplication, rationalise public
bodies, strengthen prevention and consider whether services and functions are
being delivered at the most appropriate level. 
Page 328 of 392

Page 329

3 
PUBLIC
3.4 Civil servants have been engaging with COSLA and professional organisations on
public services reform for a number of years, in particular in relation to areas such
as health and social care provision following the decision not to proceed with a
National Care Service.  Whilst it was anticipated that further exploration of health
reform may be progressed within the Programme for Government, the level and
nature of the reform proposed in relation to public services is much wider than
expected. 
3.5 A potentially significant degree of reform is proposed across the public sector,
including replacement of the existing 14 territorial NHS Boards with two Strategic
Health Boards, rationalisation of public bodies and greater consolidation of
functions, digital platforms and shared services. Significant reform of social care
is also proposed within the document. 
3.6 Further to the publication of the Programme for Government, there has been no
further release of information on the detail of the reform proposals, and what they
mean for local authorities.  In recent interviews, the First Minister has however
noted a preference for “regional local government” with greater pooling of
resources and strategic capacity at a regional level.  In terms of social care, the
First Minister has noted that a single line of decision making, accountability and
funding for social care is preferred, led by the NHS. 
3.7 The Scottish Government has indicated that a three month consultation process
will be undertaken in relation to the proposals relating to local governance, and
specifically in relation to social care reform.  Initial information on the engagement
process relating to local governance reform was sent to the Chief Executive on 15
September 2026, with further detail provided in section 4 below. 
3.8 A special meeting of COSLA Leaders was held on Friday 11th September which
was also attended by the First Minister, Deputy First Minister and Ivan McKee,
Cabinet Secretary for Public Service Reform.  Following the meeting, COSLA
issued an agreed position statement: 
“Public service reform will only succeed if it is rooted in communities, not
organisational charts. Local Government will engage with Scottish Government,
but we will not support reforms that dilute local democracy, centralise decision-
making or remove accountability from the people we serve. Decisions around
public service reform must be made in agreement between Local Government and
the Scottish Government and have the endorsement of councils on any issue
affecting them.”
3.9 A full summary of the statement is available through the following link -  Public
Service Reform Must Strengthen Local Decision Making, Not Weaken It | COSLA. 
Page 329 of 392

Page 330

4 
PUBLIC
Wider transformation discussions 
3.10 Local authorities have been progressing transformation programmes to address
the significant financial and demographic pressures facing the sector and wider
public services for many years.  A national transformation programme lead by the
Improvement Service and SOLACE has over the last few years in particular, been
working to progress opportunities for joined up working and shared services across
local authorities. Renfrewshire Council also has its own transformation programme
– Reshaping Renfrewshire – which is being progressed to improve outcomes
within the resources available to the Council and its partners. 
3.11 As reported previously to Leadership Board, discussions have also been
progressed by Glasgow City Region (GCR) in relation to developing regional
economic growth opportunities within the context of both Scottish and UK
Government’s stated commitment to the regional empowerment and devolution
agenda. GCR has been progressing a range of workstreams to develop a potential
regional empowerment proposal that could be considered and supported jointly
across member organisations for engagement with national governments which
was expected to be subject to future reporting to the Leadership Board. How the
Scottish Government’s emerging proposals for reform will integrate with the GCR
work being progressed in the context of the regional agenda is not clear at this
stage and is expected to be subject to subsequent clarification during the
engagement process over the coming months. 
3.12 Regular updates in relation to both the Reshaping Renfrewshire transformation
programme and GCR related work on regional devolution, will continue to be
provided to the Leadership Board. 
___________________________________________________________________ 
4 Next steps 
4.1 As noted above, the public services reform agenda is now moving at pace and
there remains considerable uncertainty in terms of the potential implications of
reform for local authorities.   
4.2 On 15th September 2026, the Chief Executive received notification from the Acting
Director of Local Government and Communities, setting out the Scottish
Government’s broadly anticipated approach to the engagement process over the
coming months, which is focused on securing engagement at political, officer-level
and wider stakeholder engagement activities across Scotland, including: 
• Ongoing ministerial engagement with COSLA leadership and political groups. 
• Targeted discussions and roundtables involving Ministers and Council Leaders,
including with groups of councils where there is interest in facilitating
regional/clustered discussions. 
Page 330 of 392

Page 331

5 
PUBLIC
• Discussions with local government and Scottish Government officers on the
overall programme and specific thematic areas to explore the issues, options
and the evidence available/required which are likely to be facilitated through
COSLA. 
• Wider dialogue events bringing together local authorities, public service
partners, communities, the third sector, business representatives, trade unions
and others. 
• Targeted discussions with a range of sectoral stakeholders and representative
bodies. 
• Opportunities for broader public engagement through digital channels 
4.3 As part of this correspondence there was a request to consider and express and
interest in assisting and supporting Government in terms of the planned
engagement process with respect to three key strands of the planned
engagement: 
Invitation to participate – Dialogue on Local Governance reform 
1. Political engagement 
o Whether there is an interest in helping to facilitate a ministerial
discussion or roundtable involving elected members, including where
it may make sense to do so with other councils; 
o Whether there are existing political forums, regional groupings or
arrangements that would provide a useful setting for such discussions. 
2. Wider dialogue events 
o Whether your council, or a cluster of neighbouring councils, would be
interested in working with the Scottish Government to host one of a
small number of wider engagement events (presumed to operate
across Scotland) from mid-October to mid-November. 
o These events would bring together a broad range of local partners,
including public bodies, communities, the third sector, business
interests and trade unions, to contribute to the wider listening
exercise. 
o The Scottish Government have indicated a particular interested in
identifying areas where there is enthusiasm to convene a diverse
range of local voices and perspectives. 
3. Additional opportunities 
o Any other suggestions you may have regarding engagement activity,
stakeholder groups we should involve, or approaches that would help
ensure the dialogue is as inclusive and productive as possible. 
Page 331 of 392

Page 332

6 
PUBLIC 
4.4 Scottish Government officials have requested a quick response to this invitation,
and elected members are asked to consider this request and to advise officers on
the level and nature of engagement to be supported. 
4.5 Over and above this specific participation request, officers will ensure that
information in relation to public service reform proposals and the consultation
process itself is shared timeously with elected members.  Regular reports will be
provided to the Leadership Board, however given the likely pace and intensity of
the reform agenda going forward, elected members are asked to note that it may
be necessary to hold special meetings of the board to consider time limited
matters such as a formal consultation response to any proposals. 
4.6 As we move forward, a particular focus will continue to be engaging with the
Council’s workforce and local trade union representatives to ensure that
information is shared openly when this becomes available. It is recognised that
proposals in relation to public service reform, and the wider reporting of these
within the media, will require the organisation to provide reassurance and clarity
on information available in the public domain to our employees as a priority. 
4.7 Information on reform proposals and implications for communities and service
users will also be provided as this becomes available. 
_________________________________________________________________
Implications of the Report 
1. Financial – The reform of public services is intended to deliver more efficient
service delivery, however further information in relation to the financial implications
of the reform agenda, is not yet available and would require to be robustly
assessed as and when this is provided.
2. HR & Organisational Development – As noted within the report, as further
information becomes available on proposed reforms, it will be important to share
this with the Council’s workforce, and to provide an opportunity to engage in
relation to the impact of any planned reforms. 
3. Community/Council Planning – the Programme for Government notes that the
promotion of wider community empowerment principles will be a key element of
the wider reform of public services.
4. Legal – At present there is no specific information on the reforms proposed for
local authorities and the provision of social care in particular, or the legislative
basis upon which any reforms would be progressed.
5. Property/Assets - none
6. Information Technology - none 
7. Equality and Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. As
the detail of the proposed reforms is not available, it is not yet possible to
Page 332 of 392

Page 333

7 
PUBLIC
undertake a detailed assessment of equality implications.  Detailed equalities and
human rights assessments would be required to be undertaken at both a national
and local level, when full information is made available to local authorities. 
8. Health and Safety - none 
9. Procurement – none
10. Risk – none 
11. Privacy Impact – none
12. COSLA Policy Position – none 
13. Children’s Rights – As the detail of the proposed reforms is not available, it is not
yet possible to undertake a detailed assessment of children’s rights implications.  
14. Climate Risk – none  
___________________________________________________________________ 
Report Author: Laura McIntyre, Head of Policy and Partnerships 
Page 333 of 392

Page 334

Page 334 of 392

Page 335

Public
To: Council
On: 24 September 2026
Report by: Director of Finance & Resources and Director of Environment,
Housing & Infrastructure
Heading: Governance Arrangements
1. Summary
1.1 The Council at its meeting held on 14 May 2026 agreed to appoint
Councillor McGurk the Licensing Board. Council is asked to reappoint
Councillor McGurk as set out in section 3.1 of this report.
1.2 The Tobacco & Vapes Act 2026 received assent in April 2026. That Act
confers various statutory duties on the local weights & measures
authority (Trading Standards).  The Council’s Scheme of Delegated
Functions will require to be updated to reflect the new duties and
responsibilities that will fall to Environment, Housing & Infrastructure.
1.3 At its meeting held on 26 February 2026, Council agreed to formally
declare a ‘Dolly Day’ in Renfrewshire, to be marked annually, in honour
of Dolly Parton’s 80th birthday and her outstanding contribution to
literacy and early years development through the Imagination Library.
A request has now been received that Council buildings be lit pink on
25 September each year, starting this year, to mark ‘Dolly Day’. The
report sets out arrangements arising from an occasional overlap with
MacMillan Cancer Support’s MacMillan Coffee Morning.
2. Recommendations
2.1 That Councillor McGurk be reappointed to the Licensing Board.
2.2 That The Tobacco & Vapes Act 2026 be included in the list of
Item 8
Page 335 of 392

Page 336

Public
legislation set out in the Scheme of Delegated Functions which fall
within the scope of the Director of Environment, Housing &
Infrastructure and the Head of Climate, Public Protection & Roads. 
2.3 That Council buildings be lit pink on 25 September each year, starting
this year, to mark ‘Dolly Day’ subject to the detail set out in section 3.3
of the report.
_____________________________________________________________________
3.1 At the meeting of Council held on 14 May 2026 it was agreed that
Councillor McGurk be appointed to the vacant position on the Licensing
Board.  In terms of the Licensing (Scotland) Act 2005 the Licensing
Board shall consist of not fewer than 5 and not more than 10 members
as may be determined by the Council. All members of the Board
require to undertake a course of training accredited by the Scottish
Ministers within three months of their appointment to the Licensing
Board, whether or not they have been Licensing Board members
before. Assessment of training shall be undertaken under exam
conditions. Following the meeting it was not possible to arrange a
suitable date for that training to be undertaken within that three month
period and accordingly the appointment fell. A suitable date has now
been agreed. Therefore Council is asked to reappoint Councillor
McGurk to the Board.
3.2 The Tobacco and Vapes Act 2026 is a significant piece of legislation
aimed at reducing tobacco use in the UK. It introduces measures to
phase out the sale of tobacco products for future generations,
particularly targeting individuals born on or after 1 January 2009. The
Act establishes a framework for regulating the sale, display, and
advertising of tobacco and vaping products, addressing associated
health risks. The Council’s Scheme of Delegated Functions includes an
Undernote which lists the range of legislation which falls within the
scope of the Director of Environment, Housing & Infrastructure and the
Head of Climate, Public Protection & Roads. Agreement to include The
Tobacco and Vapes Act 2026 in the Undernote is requested. 
3.3 At its meeting held on 26 February 2026, Council agreed a motion
which noted that 2026 marked the 80th birthday of Dolly Parton and
recognised her work as the founder of the Imagination Library, a
globally recognised early years literacy programme which gifts free,
high-quality books to children from birth to age five. It further noted that
the Imagination Library operates successfully in Renfrewshire,
supporting families, improving early language development,
encouraging a lifelong love of reading, and helping to reduce
educational inequality. Council recognised the significant positive
impact the Imagination Library has had for children and families across
Page 336 of 392

Page 337

Public
Renfrewshire, particularly in supporting early learning, parental
engagement, and inclusion. Council therefore resolved to formally
declare a ‘Dolly Day’ in Renfrewshire, to be marked annually, in honour
of Dolly Parton’s 80th birthday and her outstanding contribution to
literacy and early years development through the Imagination Library.
Reflecting the terms of that motion, a request has now been received
from Children’s Services that Council buildings be lit pink on 25
September each year, starting this year, to mark ‘Dolly Day’.
Members are asked to note that Council has previously agreed to
annually light up Council buildings green to support McMillan Cancer
Support’s MacMillan Coffee Morning. That event falls on the last Friday
of September. It is therefore proposed that this year the buildings will
be pink to mark Dolly Day. Thereafter, on any year where the
MacMillan Coffee Morning falls on 25 September one significant
Council building will be lit up pink to mark Dolly Day, with all others
being lit up green to mark the MacMillan event.
Implications of the Report
1. Financial - none
2. HR & Organisational Development - none
3. Community/Council Planning – none
4. Legal – as set out in the report
5. Property/Assets – none
6. Information Technology – none
7. Equality & Human Rights - The Recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified arising
from the recommendations contained in the report as it deals with
Member appointments to Boards, a change of the Council’s Scheme of
Delegation to reflect a statutory change, and a building light up request.
8. Health & Safety – none
9. Procurement – none
10. Risk – none
11. Privacy Impact – none
12. CoSLA Policy Position – none
13. Children’s Rights - none
14. Climate change - none
List of Background Papers
Page 337 of 392

Page 338

Public
None
Author: Mark Conaghan
Head of Corporate Governance
0300 300 0287
mark.conaghan@renfrewshire.gov.uk
Page 338 of 392

Page 339

PUBLIC 
To:  Council 
On:  24 September 2026 
Report by: Chief Executive 
Heading:      Renfrewshire Community Protection Chief Officers Group - Annual 
Report 2025/26
___________________________________________________________________ 
1. Summary  
1.1 Renfrewshire Community Protection Chief Officers Group (COG) is responsible for
leadership, strategic oversight and scrutiny of multi-agency public protection
activity and practice in Renfrewshire, including in relation to child protection, adult
protection, community safety, the management of offenders and community
justice, alcohol and drugs, gender-based violence and migration and asylum. 
1.2 The group is chaired by the Chief Executive of Renfrewshire Council with core
representation from NHS Greater Glasgow and Clyde and Police Scotland, and
wider membership drawn from other partners agencies and services. 
1.3 This is the eleventh annual report of the Community Protection Chief Officers
Group. It provides an overview of the key areas of work of in relation to public
protection during 2025/26. 
1.4 The annual report attached at Appendix 1 to this report provides detailed
information on the activities which have been undertaken over this period, whilst
section 4.3 of the report highlights the key priorities that partners have identified
for 2026/27. 
_____________________________________________________________________ 
2. Recommendations 
2.1     It is recommended that Elected Members note the content of the report.
_____________________________________________________________________ 
Item 9
Page 339 of 392

Page 340

PUBLIC
3. Background 
3.1 Renfrewshire Chief Officers Group was established to provide leadership,
governance, direction and oversight to ensure local accountability for all aspects of
public protection. Chief Officers are responsible for ensuring that their respective
agencies, individually and collectively reflect national guidance, which directs local
services to work in partnership to achieve public protection measures. The
arrangements are comparable to Chief Officer Group arrangements in other local
authority areas throughout Scotland and were independently reviewed and
updated in April 2021. 
3.2 The key areas of activity overseen by the Renfrewshire Chief Officers Group are:  
• Child Protection
• Adult Protection
• Offender Management
• Community Protection
• Community Justice
• Alcohol and Drug Partnership
• Equally Safe Strategy; and  
• Migration and Asylum 
3.3 The Chief Officers Group provides regular reports to the Member Officer Group
which is comprised of elected members on a cross-party basis, and key officers
from the Council and partner organisations. The purpose of the Member Officer
Group is to provide senior elected members with the opportunity to formally and
regularly discharge their strategic independent scrutiny and assurance role in
relation to key activity and significant developments which have implications for
public protection matters in Renfrewshire. 
3.4 This is the eleventh annual report of the Chief Officers Group. It provides an
overview of the key areas of work in relation to public protection in Renfrewshire
over the course of 2025/26, and in doing so highlights the ongoing importance of
partnership working. 
___________________________________________________________________ 
4. Strategic focus for 2026/27 
4.1 Throughout the first six months of 2026, the Chief Officers Group completed a
self-evaluation exercise, to further support its commitment to embedding a culture
of continuous improvement and shared accountability. 
4.2 The findings from the self-evaluation were positive, particularly in terms of
assessments of culture, leadership and governance, aspects which have also
been identified as key areas of strengths through external inspection processes. 
A small number of improvements were identified to strengthen the role of the
Page 340 of 392

Page 341

PUBLIC
Chief Officers Group in terms of driving learning, improvement and leadership,
and these are now being progressed through a targeted action plan. 
4.3 The Chief Officer Group has also recently reviewed and agreed its priorities for
the year ahead:
• Responding to the national child exploitation review findings.
•    Providing oversight to the response from all learning reviews currently being
progressed by sub-committees of the Chief Officers Group.
•    Implementing the actions resulting from the self-evaluation exercise.
•    Continuing to promote opportunities to promote community cohesion across
Renfrewshire.
• Considering local actions being progressed to tackle homelessness in
Renfrewshire, given the issues being experienced on this issue at a local and
national level.
4.4   The Chief Officers Group will continue to seek to ensure that performance and 
practice are scrutinised at a strategic level, to identify what works well, to                    
highlight any areas for improvement, and to consider where further opportunities 
for early intervention and prevention activity would achieve improved outcomes 
for local people. 
4.5 The group will also continue to review on an ongoing basis the implementation of 
relevant policies and legislation which relate to public protection.
_________________________________________________________________
Implications of the Report 
1. Financial – none 
2. HR & Organisational Development – none  
3. Community/Council Planning – the Community Protection Chief Officers is
embedded within the wider approach to community planning in Renfrewshire. 
4. Legal - none 
5. Property/Assets - none
6. Information Technology - none 
7. Equality and Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report because it is for noting only. If required following implementation, the
actual impact of the recommendations and the mitigating actions will be reviewed
and monitored, and the results of the assessment will be published on the
Council’s website. 
8. Health and Safety - none 
9. Procurement – none
Page 341 of 392

Page 342

PUBLIC
10. Risk – none 
11. Privacy Impact – none
12. COSLA Policy Position – none 
13. Children’s Rights – Renfrewshire Council together with the members of the Chief
Officers Group recognise, respect, support and promote Children’s Rights.
14. Climate Risk – none  
___________________________________________________________________ 
Report Author: Michelle Stewart, Corporate Priorities Officer
Email: michelle.stewart@renfrewshire.gov.uk
Page 342 of 392

Page 343

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Community Protection
Chief Officers Group
2025/26 Annual Report
Page 343 of 392

Page 344

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Contents
Welcome        Page 1
Chief Officers Group Membership     Page 2
Member Officers Group Membership     Page 3
Renfrewshire Profile      Page 4
Chief Officers Group Self Evaluation     Page 5
Child Protection       Page 6
National Review of Group-Based Child Sexual Abuse and Exploitation Page 9
Adult Support and Protection     Page 10
Equally Safe in Renfrewshire      Page 15
Alcohol and Drugs       Page 19
Suicide Prevention      Page 22
Community Justice      Page 24
Public Protection       Page 25
Migration and Asylum      Page 30
Police Scotland        Page 31
Scottish Fire and Rescue Service     Page 36
Strategic Focus 2025/26      Page 39
Page 344 of 392

Page 345

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Welcome to our end of year report
Renfrewshire’s Chief Officers Group (COG) was established to
provide leadership, governance, direction and oversight, and to
ensure local accountability for all aspects of public protection. 
Chief Officers are responsible for ensuring that their respective
agencies, individually and collectively reflect national guidance,
which directs local services to work in partnership to achieve public
protection measures.
The COG provides regular reports to the Member Officer Group
(MOG) which is comprised of Elected Members on a cross-party
basis and key officers from the Council and partner agencies. This
provides senior Elected Members with the opportunity to formally
and regularly discharge their strategic independent scrutiny and
assurance role in relation to key activity and significant
developments, which have implications for public protection
matters in Renfrewshire.
This is the eleventh annual report of the COG. It provides an
overview of the key areas of work in relation to public protection in
Renfrewshire over the course of 2025/26, and in doing so highlights
the ongoing importance of partnership working.
1
Page 345 of 392

Page 346

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Supported by:
• Renfrewshire’s Chief Social Work Officer
• Chief Officer, Renfrewshire Health and Social Care Partnership
• Independent Chair of the Adult and Child Protection Committees
• Independent Chair of the Alcohol and Drugs Partnership
• Head of Climate, Public Protection and Roads
• Head of Policy and Partnerships
• Adult and Child Protection Lead Officers
• Local Senior Officer for the Scottish Fire and Rescue Service
Chief Officers Group Membership
Key
Areas
Child
Protection
Adult
Protection
Community
Protection
Offender
Management
Community
Justice
Alcohol
and
Drugs
Equally
Safe
Migration
and
AsylumChief Executive Chief Executive / Executive
Nursing Director
Divisional Commander ‘K’
Division
2
Page 346 of 392

Page 347

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Member Officer Group Membership
The group is comprised of Elected Members on a cross-party basis and key
officers of the council as follows:
• Three senior members of the administration 
• Two members of the main opposition group 
• One other opposition member 
• Chief Social Work Officer / Head of Children and Justice Social Work
• Chief Officer, Renfrewshire Health and Social Care Partnership or Head
of Health and Social Care
• Head of Climate, Public Protection and Roads
• Head of Policy and Partnerships, Chief Executive’s Service
Also, in attendance as required:
• Independent Chair of the Child Protection and Adult Protection
Committees
• Divisional Commander, Police Scotland or appropriate senior nominee 
The group will also invite the participation of other key individuals or
agencies involved in the areas of concern of the Member Officer Group as
required.
3
Page 347 of 392

Page 348

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Approximately 189,270
people live in
Renfrewshire, with our
population projected to
continue to grow.
Renfrewshire Profile Life expectancy is below
the Scottish average.
Female life expectancy is
80.9 compared to 81.6
nationally and male life
expectancy is 76.5
compared to 77.1
nationally.
Our population is becoming
increasingly diverse with the
latest census data showing
94.5% of the population is
categorised as white, 2.7%
are of an Asian ethnicity and
1.3% are African, Caribbean
or Black.
Renfrewshire is located
in west central Scotland
and is the 9th largest
Council in Scotland by
head of population but
covering a relatively
small land mass of 270
square kilometres.
The Scottish Index of Multiple
Deprivation (SIMD) assesses 6,976
small areas known as data zones.
Almost 25% of all data zones in
Renfrewshire are in the 20%
most deprived nationally and 2
are within the 10 most deprived
zones nationally.
4
Page 348 of 392

Page 349

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Chief Officers Group Self Evaluation
5
Agreement was reached at the Chief Officers Group meeting on 14
January 2026 to progress a self-evaluation exercise, which would
further support the Group’s commitment to embedding a culture
of continuous improvement and shared accountability.
A self-evaluation framework was developed  by Council officers
based on the PSIF model andinformed by other resources such as
the Chief Officer public protection induction resource.
The agreed self-evaluation framework involveda simple three
stage process:
Stage 1: Completion of a self-assessment checklist
Stage 2: A consensus session
Stage 3: An improvement planning session
Each of these stages has now concluded,  the findings were
positive, particularly in terms of culture, leadership and
governance. The findings however evidenced a significant degree
of reflection by COG members, with the following improvement
areas identified and an action plan developed.
Strategic Focus and Leadership
• Agree 2–3 clear strategic priorities and small number of outcome
measures to drive improvement
• Align agendas, spotlight sessions, and reporting to these priorities
• Embed brave, focused leadership through constructive challenge
and reflective discussion
Assurance, Learning and Impact
• Strengthen challenge and scrutiny of reports to drive
improvement
• Improve how impacts and outcomes are measured using
qualitative and quantitative evidence
• Embed regular self-evaluation and learning, informed by audit,
review and inspection activity
Identity, influence and engagement
• Strengthen the collective identity of the Chief Officers Group as a
single strategic partnership
• Articulate and demonstrate influence and added value within a
complex public protection arena
• Improve communication and engagement with key stakeholders
• Explore how the Chief Officers Group can improve awareness of
public protection risks.
Page 349 of 392

Page 350

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Renfrewshire Child Protection Committee (RCPC)
RCPC is the local partnership responsible for leading, developing
and improving child protection across agencies and communities.
Its independent chair is Tam Baillie. 
RCPC delivers its key functions of continuous improvement,
public information and engagement and strategic planning
through a range of multi-agency subgroups:
A key priority of the RCPC Plan for 2025-28 is to undertake a
review of the RCPC subgroups. Since June 2025, Children Affected
by Parental Alcohol and Drug Use and the Vulnerable Young
Persons Strategic Group have been reporting to RCPC on a
quarterly basis.
Inter-agency Referral Discussions (IRDs)
From 1 April 2025 to 31 March 2026, 341 IRDs were undertaken for
547 children. The outcomes for these children were: progression
to child protection (368 children); information/advice (33
children); referral to another agency (19 children); and no further
action (127 children).
Child Protection Register
RCPC collects and reviews data in line with Version 2 of the
Minimum Dataset for Child Protection Committees in Scotland.
The number of children whose names are placed on the Child
Protection Register is reviewed quarterly by RCPC and weekly by
senior managers from the key agencies. On 31 March 2026, the
names of 93 children were on the Child Protection Register
compared to 63 children in March 2025.
Of these children, 40 had been on the register for between 0 and
12 weeks, 19 had been on the register for between 13 and 26
weeks, 24 had been on the register for between 27 and 52 weeks
and 10 for more than 52 weeks. The Complex Case Oversight
Group considers all children whose names have been on the
register for a year or more.
Learning and
Development
Continuous
Improvement
Policy, Practice and
Procedures
Complex Case
Oversight Group
CAPADU Learning Review Vulnerable Young
Persons
Joint
Communications
Group (RCPC and
RAPC)
Child Protection
6
Page 350 of 392

Page 351

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Training
The Learning and Development Subgroup of RCPC has oversight of
inter-agency training. The training priorities are informed by
training needs analysis and the outcome of learning reviews, the
following training was provided during the reporting period:
• Joint child and adult protection course for the general
workforce
• Attachment, Trauma and Neuroscience (using virtual reality) to
understanding the importance of early intervention and
nurture
• Safe and Together: Internationally recognised model for
tackling Domestic Abuse and Coercive Control
• Contextual Safeguarding: Addressing Child Exploitation (using
virtual reality) for adolescents affected by Child Criminal and
Sexual Exploitation
• Child Protection Level 2 and GIRFEC refresher to multi-agency
staff who work directly with children and their families
• Training in the Assessment of Care Toolkit for understanding
neglect and working in partnership with parents and carers to
address neglect
• Recently updated Parental Mental Health and Child Welfare
and Protection Training
• Online Safety, developing a safety net for children online
Child Protection
7
Page 351 of 392

Page 352

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Improvement Plan
RCPC continues to progress its improvement plan for 2025-2028
which incorporates improvement actions from the recent joint
inspection of services for children at risk of harm in Renfrewshire.
During 2025/26, RCPC undertook a number of key areas of work
including:
RCPC Conference
RCPC delivers a biennial Child Protection Conference. Planning is
underway for the 2026 conference which will take place on
Thursday 8th October 2026. The theme of the conference will be
‘Protection Generation Z: Child Protection in an Age of Connection
and Complexity’. Speakers will include Dez Holmes, Research in
Practice and Stuart Allardyce, The Lucy Faithfull Foundation.
Child Protection App
In March 2026, RCPC launched a child protection app which
includes the local child protection procedures along with
additional guidance and procedures. The app is aimed at
practitioners and managers across Renfrewshire and can be
downloaded to a mobile phone or the content can be accessed
through the Rights Decisions website.
Learning Reviews
RCPC continues to progress the improvement plans for the two
Learning Reviews that concluded in 2024/25. These are now
nearing completion. 
During 2025/26, a further two Learning Reviews were concluded,
and improvement plans are now in place. In addition, a Thematic
Learning Review took place to consider how young people aged 16
to 17 involved with mental health services are supported where
there are adult support and protection or child protection
concerns. It is anticipated that the Thematic Review will conclude
by  late 2026.
IRD Audit
In October 2026, RCPC undertook a multi-agency audit of 105 IRDs
which did not progress to child protection. The audit provided
reassurance around decision making in IRDs and that IRDs were
being held appropriately.
Child Protection
8
Page 352 of 392

Page 353

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
National Review of Group-Based Child Sexual Abuse and Exploitation
9
In February 2026, the Care Inspectorate wrote to all local
authorities to confirm the commencement of a national review of
group-based child sexual abuse and exploitation, at the request of
Scottish Ministers. The review is being jointly led by the Care
Inspectorate and His Majesty’s Inspectorate of Constabulary in
Scotland (HMICS), with contributions from Healthcare
Improvement Scotland (HIS) and Education Scotland.
The purpose of the national review is to evaluate how effectively
Community Planning Partnerships (CPPs) prevent, identify, and
respond to group-based child sexual abuse and exploitation, as
well as group-based child criminal exploitation. The review will
also assess the extent to which Chief Officer Groups (COGs)
understand the scale, nature, and risks associated with these
forms of exploitation.
The review focuses on children under 18, including young adults
who were under 18 within the past two years and may have been
vulnerable to exploitation during that period. Inspectors are
considering both current practice and activity between 1 January
2024 and 31 December 2025,  with the option to request historical
information.
The review is examining:
• Strategic and operational leadership, including how agencies
work together to ensure effective arrangements for prevention,
identification, and response
• Operational processes, including the quality and consistency of
practice in responding to concerns about group-based sexual
and criminal exploitation
• Impact on children, including how well supports improve safety,
wellbeing, and outcomes for those at risk or affected
The national review is being delivered in three phases:
Phase One (February–September 2026): Assessment of COG
understanding and oversight. This includes a self-evaluation,
completion of a national questionnaire, and structured interviews.
Phase Two (Summer 2026–Autumn 2027): A risk-based
programme of scrutiny informed by Phase One findings,
identifying strengths and areas for improvement.
Phase Three (2027 onwards): National recommendations and
improvement actions based on learning from the first two phases.
In Renfrewshire, a dedicated planning and preparation group has
been established to ensure a coordinated and robust response.
Page 353 of 392

Page 354

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Renfrewshire Adult Protection Committee (RAPC)
RAPC is chaired by an independent chair Tam Baillie and meets
quarterly. RAPC is a multi-agency forum which leads on the
coordination and development of local responses to adult support
and protection (ASP), including prevention of further harm. RAPC
leads the strategic development, implementation and oversight of
ASP arrangements for adults at risk of harm in Renfrewshire. It is
committed to raising public awareness of ASP issues and working
collaboratively with partner agencies and local communities to
safeguard adults at risk of harm.
The key functions of RAPC are undertaken by a range of subgroups
which are shown below:
Learning and Development Subcommittee
The Learning and Development Subcommittee has oversight of
multi-agency ASP training and development in Renfrewshire.
In November 2025, RAPC hosted the Biennial Conference with a
focus on adult support and protection and mental health. Over
130 multi-agency staff from the adult protection partnership
attended the event. The main speaker was Betsy, an adult with
lived experience who provided a thought-provoking input.
Throughout the reporting period, RAPC has held regular online
Lunchtime Learning Sessions on a range of subjects relevant to
ASP. These have included cuckooing, the Herbert Protocol and
missing persons, adult learning reviews and The Promise: care
experienced adults.
The following multi-agency training was provided during the
reporting period:
• Introduction to ASP - See Something, Say Something Training
• Child and Adult Protection General Awareness Raising
Training- For the Wider Workforce
• Behind the Dementia
• Dementia and Distress
• Transforming Connections (Trauma skilled level)
Adult Support and Protection
10
Page 354 of 392

Page 355

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Continuous Improvement Subcommittee
The subcommittee leads on multi-agency ASP continuous
improvement activity in Renfrewshire, providing scrutiny to data,
audit and have oversight of RAPC’s improvement plan.
During the current reporting period, the subcommittee
established a multi-agency Data Subgroup which supports multi-
agency data sharing and analysis to identify trends, anticipate
risks and strengthens ASP services through identified
improvement actions.
Single agency ASP audits have been implemented across social
work and health to support quality assurance and to support
improvement across the services. Work is currently underway to
incorporate police audits into the process.
The subcommittee is in the process of standing up an adult
participation short life working group to lead on ensuring that
those involved in ASP processes contribute to the evaluation and
improvement of services and to increase representation of people
with lived experience at RAPC.
Policy and Practice Subcommittee
During the reporting period, the Policy and Practice Subcommittee
updated and ratified RAPC multi-agency guidance on Adult
Learning Reviews and Large-Scale Investigations (LSIs).
Care Home Collaborative Support Team Group
In addition to the subgroups, the Care Home Collaborative
Support Team Group provides enhanced clinical and care
oversight arrangements for care homes to support care home staff
to keep residents safe. Clinical and care professionals have a
leading role in the oversight for care homes and meet monthly. 
Partners remain proactive and deployed clinical and care teams,
to improve standards and reduce any risk to residents.
Operational Manager Practice Development Group
During the reporting period, the Operational Manager Practice
Development Group continued to meet to strengthen operational
leadership and improve connectivity between the RAPC, subgroup
activity, and operational staff across Social Work, NHS and Police
Scotland.
Adult Support and Protection
11
Page 355 of 392

Page 356

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Joint Communications Subcommittee
The joint RAPC and RCPC communications subcommittee
continued to meet during this reporting period.
The subcommittee has made progress in the following areas:
• Coordinating and hosting the launch of the National
Framework for ASP Learning and Development in Scotland in
February 2026
• Launching the RAPC webpages on the Renfrewshire HSCP
website which provide information about RAPC; information
for people working with adults who may be at risk of harm;
multi-agency training and events; local and national ASP
policies, procedures and guidance
• Raising awareness of National Adult Support and Protection
Day 2026 across professionals and the public in Renfrewshire
• Publishing a quarterly RAPC Newsletter providing an overview
of the work of the committee; national ASP updates; learning
and development opportunities; an overview of services and
publications which are of interest to those working in the field
of ASP
Adult Support and Protection and Child Protection
12
Page 356 of 392

Page 357

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Referrals and Inquiries
In 2025/26 there were 2040 referrals which is a 33.8% increase 
from 2024/25 where referrals were 1525. The number of adults the
referrals related to were 1312. 87.9% of the adults referred had
one or two referrals in the reporting year. 12.1% were referred
three or more times in the reporting year.
The total number of Inquiries for 2025/26 was 1791.  Of these 1070
were completed with the use of Investigatory powers.From this, 
there were 62 inquiries for 59 adults where an enhanced risk
assessment was required.
The enhanced risk assessment was completed for 37.1% of adults
referred three or more times. All activity related to Inquiries and
Investigatory activity; Renfrewshire complies with the Code of
Practice using Council Officers for all investigatory activity and
Council Officer oversight for enquiries without investigatory
powers where a non-Council Officer completed it.
The highest care group of adults at risk of harm who had inquiries
undertaken were those with Dementia (569) followed by adults
with other Mental Health conditions accounting for 427. 59.4 % of
our inquiries were for adults 65 years and over.
The data confirms that the person’s home is where harm occurs
with 981 (54.8%) occurring within their own home and 462 (25.8%)
within a care home. The location of harm occurring in a care home
has increased slightly from the previous year.
Physical Harm remains the principal type of harm and was
reported in 507 inquires (28.31%). It continues to be the highest
reason for referral followed by psychological/emotional harm 277
(15.47%) and self neglect 201 (11.22%).
Large-Scale Investigations (LSI)
There were no LSI’s during the reporting period. Any care homes
on the cusp of an LSI are managed under a preventative approach,
where the HSCP balance a supportive approach with a statutory
duty under Adult Support and Protection legislation. The HSCP
was proactive, as soon as issues were identified the necessary
support and services were deployed via HSCP clinical teams.
Adult Support and Protection
13
Page 357 of 392

Page 358

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Adult Support and Protection
Adults with Incapacity (AWI)
Demand for AWI reports, which require to be completed by a
qualified Mental Health Officer, remains high for both private and
Chief Social Work Officer applications. There were 298 requests for
AWI mental health officer reports during the period compared to
264 requests in the previous year. Thehigh rate of local requests
can in part be caused by discharges from the Royal Alexander
Hospital, Paisley. Hospital discharges are continually monitored
and all related requests for AWI reports are prioritised. Where
appropriate, the MHO service will ask for the use of interim orders
to facilitate discharge.
Welfare Guardianships
Orders where the CSWO is appointed Welfare Guardian fell from
102 in 2024/25 to 96 in 2025/2026. Each order requires a qualified
social worker to act as the “nominated officer” on behalf of the
CSWO to supervise the powers in order. In addition, there were
approximately 158 private welfare guardianship reports
completed, and these orders require a minimum of one statutory
visit by a guardianship supervisor after being granted to offer
support.
14
Page 358 of 392

Page 359

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Equally Safe Partnership Activity
Renfrewshire’s Equally Safe Partnership is a multi-agency
coalition bringing together statutory and third-sector
organisations to prevent and eradicate violence against women
and girls, ensuring an effective and strategic approach is taken to
progressing the priorities set out in the national Equally Safe
Strategy.
Violence against women and girls has far-reaching and damaging
consequences for individuals, communities and public services.
Renfrewshire’s Equally Safe Partnership is strengthening
workforce knowledge and skills to identify and respond effectively
to violence against women and girls, while ensuring perpetrators
are held accountable. In line with the Equally Safe strategy, the
partnership is using recognised frameworks and approaches,
including the Equally Safe in Practice Knowledge and Skills
Framework, the Safe and Together Model, and Equally Safe at
Work accreditation. These initiatives aim to prevent and eradicate
gender-based violence and challenge the attitudes and systems
that allow it to continue.
The partnership is represented at national VAWG forums, which
continue to highlight challenges with current funding models and
the need for sustainable, coordinated commissioning of services
for women and children affected by violence. Demand is rising and
becoming more complex across services and COSLA have
highlighted that Violence Against Women Partnerships and multi-
agency arrangements require sustained resourcing to coordinate
delivery and manage risk effectively. Scottish Government are
piloting a VAWG Needs Assessment Tool which aims to strengthen
partnership working, promote shared responsibility, and identify
opportunities to improve safety, wellbeing and services. We await
the publication of the updated Equally Safe Delivery Plan and will
refresh local plans accordingly.
A further national development is the introduction of a national
multi-agency domestic homicide and suicide review model for
Scotland. Domestic Homicide and Suicide Reviews (DSHR) were
introduced in Scotland in April 2026 to identify what lessons can
be learned and applied following a death where abuse is known or
suspected in order to help prevent future abuse and deaths. The
approach is welcomed; however, concerns have been highlighted
about the disconnect between the DHSR Guidance and the role of
Violence Against Women Partnerships, MATACs, MARACs, and
existing learning review processes in place locally.
Equally Safe in Renfrewshire
15
Page 359 of 392

Page 360

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Renfrewshire MARAC Annual Referral Trends
During 2025, Renfrewshire MARAC reviewed 234 high-risk
domestic abuse cases, compared with 350 referrals in 2024.
Although this represents a 33% reduction in referrals, the previous
year experienced exceptionally high demand, and referral levels
remain significant. The continued volume of cases demonstrates
the effectiveness of partner agencies in identifying and responding
to individuals at risk of serious harm. The impact of domestic
abuse on families remains evident, with 349 children linked to
MARAC referrals during the year, highlighting the need for
safeguarding responses that address the needs of both victims
and affected children.
The complexity of cases remains a key feature of MARAC activity,
particularly in relation to repeat victimisation. During 2025, 104
referrals (44%) involved repeat cases, indicating that many victims
continue to experience ongoing or escalating risk despite
intervention and support. This underlines the importance of
coordinated multi-agency safety planning, disruption of harmful
behaviour and sustained support services.
Overall, while referral numbers have reduced from the previous
year, the data demonstrates the continuing importance of MARAC
in managing complex, high-risk domestic abuse cases and
maintaining strong partnership responses across Renfrewshire.
Renfrewshire Women’s Aid
Renfrewshire Women's Aid experienced significant growth and
development in 2025/26, continuing to provide refuge and support
services while relocating to larger, more discreet premises in
Paisley, which officially opened in June 2025. The new premises
have enhanced service delivery by providing dedicated,
welcoming spaces for support, staff, meetings and training,
including a family-friendly room that enables children to play
safely while their mothers access support.  Strong partnership
working has enabled Children’s Services Social Work to make
effective use of the new facilities in supporting women open to
Justice services as well as families.
Equally Safe in Renfrewshire
16
Page 360 of 392

Page 361

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Caledonian System
The Caledonian System is Scotland’s accredited integrated
practice intervention approach for men convicted of domestic
abuse offences.This Court mandated programme aims to improve
the lives of women, children and men impacted by this crime. It
provides an intensive, approximately 2-year programme for
sentenced men (individual and groupwork), alongside trauma
informed support for partners and children.
Recurring funding from Scottish Government has been agreed and
internal planning is now well underway to implement the
Caledonian System in Renfrewshire. Extensive specialist staff
training provided by the national Caledonian team is scheduled to
take place across September and October 2026.
16 Days of Activism
Services and community groups across Renfrewshire’s multi-
agency partnership actively participated in the annual 16 Days of
Activism Against Gender-Based Violence. The 16 Days run from
25th November (the International Day for the Elimination of
Violence Against Women) until 10th December (International
Human Rights Day).
The partnership supported Renfrewshire’s annual Reclaim the
Night march, which took place on 27th November 2025 with the
theme UNITE! – Invest to Prevent Violence Against Women and
Girls. 
Equally Safe in Renfrewshire
17
Page 361 of 392

Page 362

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Children and Young People
In June 2025, in partnership with Education Scotland,
Renfrewshire hosted a youth assembly. The event brought
together nearly 200 young people from across Scotland, including
representatives from 10 Renfrewshire secondary schools, to
promote leadership and peer-led action on gender-based violence
under the theme “Action for Change”. The day featured keynote
speakers, including renowned American author and educator, Dr
Jackson Katz, the creator and co-founder of the Mentors in
Violence Prevention (MVP) programme.
The youth assembly offered young people the chance to have their
voice heard and directly influence how the Council and its
partners support young people to prevent violence. It's one of
many events led by Youth Services and Children's Services as part
of Young and Equally Safe in Renfrewshire (YES), which aims to
tackle gender-based violence affecting young people, across
schools and communities. The YES project was shortlisted as a
finalist in the Youthlink National Award 2026.
The MVP (Mentors in Violence Prevention) Programme is
Renfrewshire’s approach to tackling gender-based violence in
schools. Through peer mentoring, younger students are
encouraged to consider and discuss different scenarios such
asbehaviour online, the use of harmful language, coercive control,
gender labelling and alcohol and consent. A range of safe options
which can prevent situations from escalating are then discussed.
MVP is running in all Renfrewshire secondary schools with over
500 pupils involved and taking part in mentor training.
In April 2026, Park Mains High School in Erskinewas the focus for
an Education Scotland case study onengaging boys and menin
the MVP programme.
‘Ready to Talk’ is a campaign run in partnership with I Am Me
Scotland, NSPCC Scotland and Renfrewshire Child Protection
Committee which launched in October 2025. The campaign aims
to keep young people safe from child sexual exploitation (CSE) by
recognising the importance of having supportive conversations
about (un)healthy relationships.
Renfrewshire Council’s Women and Children First service
celebrated 25 years of supporting women and children affected by
gender-based violence. The team are increasingly involved in
contributing to Child Protection processes, reflecting strong multi-
agency protection arrangements and earlier identification of the
significant risk of harm associated with domestic abuse.
Equally Safe in Renfrewshire
18
Page 362 of 392

Page 363

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Drug Deaths
In Renfrewshire, there were 46 drug-related deaths in 2024 which
represents an increase of 4.5% from 44 in 2023. 
Drug-related deaths in Renfrewshire, 2014 to 2024
Renfrewshire had the sixth highest rate of deaths per 100,000
population (2010-2024) at 29.1 and above the Scottish average of
19.1. This is similar to the previous 5-year rate where we had the
seventh highest rate of deaths at 28.9.
Alcohol Deaths
In Renfrewshire, there were 49 alcohol-specific deaths in 2024
which represents a decrease of 6% from 52 in 2023.
Alcohol- specific deaths in Renfrewshire, 2014 to 2024
The alcohol-specific deaths rate for Renfrewshire for 2020-2024
was 24.9. The alcohol-specific deaths rate for Scotland for 2020-
2024 was 21.9. At council area in the last five years, Glasgow City,
Inverclyde, North Lanarkshire, West Dumbartonshire, Dundee
City and Na h-Eileanan Siar all had alcohol-specific death rates
higher than Renfrewshire.
Alcohol and Drugs - Analysis of Current Trends
NOTE: 2025 Data for Drug–related deaths and  Alcohol-specific were not published at the time of writing.
19
30
19
42 38
50 45
67
50
39 40
46
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
44
37 40 44
50
36
44
53
42
52 49
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Page 363 of 392

Page 364

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Alcohol and Drugs Needs Assessment
The New Harbour Project
The ADP Needs Assessment identified people experiencing
homelessness or housing instability as a priority group due to the
increased risks of substance-related harm, poor health outcomes
and alcohol and drug-related deaths.
As a result, The New Harbour Project was established to provide
intensive housing-led support for people affected by alcohol
and/or drug use who are experiencing, or at risk of, homelessness.
Building on the success of the My Life Ahead programme, the
project is aiming to improve housing stability, strengthen
engagement with treatment and recovery services, and support
overall wellbeing. Delivered by Renfrewshire Council's Housing
Support Team, the project is expected to support around 100
households over two years, with a particular focus on providing
trauma-informed support for women with complex needs
Funding from both the ADP and Renfrewshire Council will enable
the project to operate until the end of 2027.
Routes to Recovery
The ADP Needs Assessment also highlighted opportunities to
further strengthen access to support, particularly through
enhanced community engagement, clearer pathways into
services, and greater use of peer-led approaches. In response, the
ADP commissioned Blue Triangle to deliver Routes to Recovery.
A dedicated Peer Volunteer Co-ordinator has been recruited to
develop a network of trained peer volunteers who will engage with
individuals in their communities, build trusting relationships, and
provide a barrier-free route into treatment and recovery support.
The project will actively seek to engage people who are not
currently accessing services through referrals from key points of
contact, including the Community Safety Hub, the Scottish
Ambulance Service, the Royal Alexandra Hospital, and individuals
newly referred to treatment services.
Peer volunteers will provide practical and emotional support as
individuals navigate treatment and recovery services, helping to
improve engagement, reduce drop-out rates, and encourage re-
engagement following periods of relapse. An independent
evaluation will assess the impact of the project.
Renfrewshire Alcohol and Drug Partnership
20
Page 364 of 392

Page 365

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Alcohol Brief Interventions
Alcohol Brief Interventions (ABIs) remain a key component of
Renfrewshire ADP’s prevention and early intervention approach to
reducing alcohol-related harm. The ADP continues to strengthen
ABI delivery by increasing workforce confidence, improving
recording practices and expanding opportunities for alcohol-
related conversations across a wider range of settings.
To support this, refresher training is being delivered to
practitioners who have previously completed ABI training,
ensuring staff feel confident initiating non-judgemental
conversations about alcohol use and accurately recording
interventions. This targeted workforce development activity is
expected to improve the consistency and quality of ABI delivery,
contributing to increased recording rates and greater reach across
the population.
The ADP has also increased local training capacity, with two team
members completing Train-the-Trainer qualifications. This
investment will enable the delivery of sustainable, locally-led
training and support the implementation of a comprehensive ABI
Action Plan. The Action Plan will focus on increasing ABI delivery,
strengthening recording and reporting arrangements, broadening
staff training opportunities, and embedding routine alcohol
conversations across health, social care and community services.
Provision of Naloxone Kits
Renfrewshire ADP continues to prioritise the distribution of Take-
Home Naloxone (THN) and overdose prevention training as part of
its commitment to reducing drug-related harm and deaths. In
2025/26, services distributed 1,288 naloxone kits, an increase from
1,023 in 2024/25, significantly exceeding the annual target of 720
kits.
A Naloxone Training for Trainers (T4T) programme has been
developed to support individuals and organisations across
Renfrewshire who are interested in delivering Naloxone training to
individuals accessing local services. This session had been
developed and was piloted in December 2025, with four staff
members participating from Renfrewshire Alcohol and Drug
Recovery Service and Street Connect.
Renfrewshire Alcohol and Drug Partnership
21
Page 365 of 392

Page 366

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
In Renfrewshire, there were 17 probable suicides in 2024, a
decrease from 19 in 2023. In the same period, there were 704
probable suicides registered in Scotland, a reduction of 84 from
the previous year.
Probable Suicides in Renfrewshire, 2014 to 2024
Age-standardised mortality rates of probable suicide deaths
by council area, 2020-2024
For the period 2020-2024, Renfrewshire had the seventh lowest
rate of deaths per 100,000 population which is below the
Scottish average.
Suicide Prevention: Probable Suicides - Analysis of Current Trends
NOTE: Data for 2025 not available until mid September 2026.
22
24
21
16
23
13
16
22
25
33
19 17
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Page 366 of 392

Page 367

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Suicide Prevention
The Renfrewshire Strategic Suicide Prevention Group
The multi-agency group has been paused, and a short life working
group (SLWG) has been established to refresh the terms of
reference for the strategic group. The SLWG will have a focused
approach and take a deep dive into the data and identify any
actionable areas.
Following completion of the SLWG the terms of reference will be
refreshed for the RSPSG which will continue to support the key
actions from "Creating Hope Together".
Data Analysis Subgroup
The subgroup has now been established, and local data is being
collated and analysed to develop an understanding of the local
context. Those deaths by suicide who are known to services will
be formally reviewed through existing processes, while those
deaths not  known to services are now being informally reviewed
by the co-chairs of this group. 
Ensure early intervention for those most at risk of having
thought of suicide
Distress Brief Interventions (DBI) – RAMH have been commissioned
by Renfrewshire to deliver DBI on the HSCPs behalf. There is an
implementation plan underway to facilitate the referral process
and pathways to support DBI. The main priority is to ensure police
officers have received level 1 induction which allow them to refer
direct to RAMH for a level 2 intervention to be delivered.
The Community Safety Service daily hub meeting provides a
platform for mental health referrals to be made direct and
provides a clear pathway for communication between Police
Scotland and health care professionals by identifying those within
the community who are at risk due to their mental health. This
process allows the concerns raised to be addressed in a timely
manner and supporting a positive outcome and reducing the calls
to Police Scotland.
23
Page 367 of 392

Page 368

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Unpaid work and personal placements
Work has progressed to expand the use of personal placements
within unpaid work, supporting a more flexible and person-
centred approach to Community Payback Orders. Engagement
with third sector and employability partners has helped increase
awareness and identify a broader range of placement
opportunities.
This approach is supporting improved engagement and
completion of unpaid work, while enabling individuals to build
confidence, develop skills and establish routine. It also
strengthens links between justice services and local
communities, creating pathways into volunteering, training and
employment.
Health Alignment
Work is underway to better understand how individuals involved
in justice services access and experience alcohol, drug and
wellbeing support, recognising the complexity of needs and the
breadth of available services.
While there are positive partnerships and effective practice in
place, feedback highlights that services can sometimes be
experienced as fragmented.A whole-system approach is being
developed to map pathways, identify gaps and improve
coordination, supporting more consistent and person-centred
responses that makes best use of available capacity.
Engagement in HMP Barlinnie
Engagement within HMP Barlinnie has provided valuable insight
into the experiences of individuals in custody linked to
Renfrewshire, helping to inform improvements to throughcare
and transitions.
Feedback from themed sessions highlights challenges around
housing stability, access to employability support and navigating
services.
Learning from this work will inform the next phase of system
analysis, supporting partners to identify gaps, strengthen
coordination and improve outcomes for individuals.
Community Justice
24
Page 368 of 392

Page 369

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
CONTEST
Following revision by the Scottish Government Strategic Board, it
was agreed that there will be a three-year Local CONTEST Delivery
Strategy for each local authority.
PREVENT Self Assessment
The Council undertook a robust  self-assessment as part of a
revised approach to how PREVENT is working across Scotland.
The self-assurance was then reviewed by Home Office officials
who highlighting the following areas of best practice:
• Senior oversight and prevent partnership –strong governance
structures in place to ensure senior management is well
informed and Prevent features in multiple organisational and
multi-agency forums allowing for appropriate reporting
• Training – Prevent training is mandatory for all staff and
hosted on the Local Authority learning platform ensuring the
workforce is aware of their statutory duty
• Referral pathway – clear information available to staff about
how to make a referral, utilising intranet and external web
pages direct members of the public on how to report concerns
Areas of development included: formalising arrangements in
relation to venue hire; further enhancing risk assessment methods
and ensure dynamic recording of risks is undertaken.
Serious Organised Crime and Trading Standards-
Tobacco and Nicotine Vapour Products (NVPs)
The sale and supply of single-use nicotine vapour product
(vapes) came into force in Scotland from June 1, 2025. The
Trading Standards team provided advice to all 240 registered
businesses  registered to sell vape products, including online
sellers and trade suppliers.
Work around the supply of illicit Tobacco and illegal Nicotine
Vapour Products (NVPs or Vapes) continues to be the focus of the
Trading Standards and Licensing team and enforcement visits
were conducted, utilising the tobacco detection dog as part of
Operation CECE; part of a UK-wide partnership initiative between
HMRC and Trading Standards services, to remove illicit tobacco
products from the marketplace.  Illicit products are regularly
being recovered  with  traders becoming more sophisticated in
their approach to avoiding detection.
Renfrewshire Trading Standards also led on a national project
investigating the prevalence of - and detriment caused by – short
weight solid fuel products. The cost-of-living crisis has
increasingly seen citizens investigate and use alternative sources
of energy as gas and electricity prices have increased.
Public Protection
25
Page 369 of 392

Page 370

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Community Safety
Firework Control Zones
Applications were sought from community groups between
November 2025 and January 2026. With no applications being
received during this window, no FCZs have been taken forward for
consultation this year. The same application window will be open
for groups to apply during 2026/27.
Operation Moonbeam
As with previous years, Officers from across the Community Safety
Partnership were engaged in a number of support activities under
the banner of Operation Moonbeam (Police Scotland lead) on
Bonfire Night.
Dried Up Private Water Supplies
As a result of a dry spring in 2025, the Service supported users of
five private water supplies which had dried up through provision
of over 1200 litres bottled water (received from Scottish Water) for
cooking, drinking and washing. This has been an annual
occurrence over recent years.
Service Reviews
The Community Support Service (Wardens) and the Public Space
CCTV review remained ongoing through 2025/26, with the new
operating model designed to ensure that the services are aligned
with current demand.
Public Protection
26
Page 370 of 392

Page 371

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Environmental Health
Radon Compliance Monitoring Programme
Officers undertook a radon monitoring programme, issuing
monitoring kits to ground-floor Council homes, 10 operational
workplaces and five schools/early learning centres within
potential affected areas. Results have been very positive, with no
remedial action having been identified.
Tenants were informed of their results, and periodic re-testing
requirements are embedded into business processes. A new
Radon Policy has been developed to support ongoing monitoring
arrangements.
Health and Safety Interventions
Officers conducted a number of interventions relating to carbon
monoxide poisoning from gas installations, and the risks of
explosion from use of LPG cylinders within relevant premises.
Appropriate enforcement action was taken  by Officers to remove
any identified risks.
Recruitment
With Environmental Health Officers being challenging to recruit,
the Service completed a phase of recruitment to bring in new
Technical Officers to support the team and also supported a
trainee Food Safety Officer and Trainee Environmental Health
Officer in successfully passing their professional exams. The
service continues to review recruitment (and development)
opportunities for professional staff within the challenges faced by
both Environmental Health and Trading Standards to
successfully recruit into these professions.
Public Protection
27
Page 371 of 392

Page 372

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
NHSGGC Public Protection Service
During 2025–2026, significant progress was made in delivering the
NHS Greater Glasgow and Clyde Public Protection Strategy,
Safeguarding: It Matters to Us 2023–2026, with continued
commitment to reducing the risk of harm to unborn babies,
children, young people and adults across our communities.
All measures within the NHS GGC Public Protection Quality
Assurance Framework have been mapped to the relevant strategic
aims and included in the Public Protection Strategy Delivery Plan
2023–2026. For each of the six aims, the plan sets out associated
goals, outcome measures, objectives and time-bound actions.
Substantial progress was made during 2025–2026.
Key areas of progress include:
Digital Improvements: Digital improvement activity has
progressed through the eHealth improvement bundle, including
development of a referral and management IRD application. West
Dunbartonshire HSCP continues to pilot an electronic solution to
test feasibility and inform wider implementation.
A customised Public Protection Service alert icon is also being
developed with acute and TrakCare colleagues to support real-
time communication, patient safety and information sharing.
Interagency Referral Discussion / Child Protection: Over the
last 11 months, 3,067 IRDs were requested and 3,902 outcomes
recorded, as more than one outcome can be selected.Of these
recorded outcomes 78 resulted in no further action (2%); 1,550
(51%) progressed to single-agency investigations; 821 (27%) to
joint investigative interviews, and 700 (23%) to joint
investigations.The remaining outcomes related to other recorded
actions. This indicates that IRD discussions support proportionate
decision-making and help identify the appropriate response to
reduce the risk of harm to children and families.
Most IRDs relate to school-aged children, with emotional care
concerns and neglect the most common presenting issues.
Between 01/04/2025 and 31/03/2026, 3,452 IRDs were held,
showing the first decrease since the Child Protection dashboard
was introduced in 2021. The reasons for this reduction are not yet
clear and are being explored, including consideration of current
thresholds.
Learning and Education: Funding has been secured for two fixed-
term posts within the PPS to support delivery of Level 3 Child and
Adult Support and Protection training, scope learning needs
across care groups and develop a sustainable, budget-aligned
training model.
Public Protection
28
Page 372 of 392

Page 373

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
NHSGGC Public Protection Service
Advice Line calls: Public Protection Nurse Advisors continue to
provide specialist advice through the Advice Line, available to
staff across NHSGGC, including independent contractors.
Emotional and physical neglect remain the most common reasons
for child protection calls. Between August 2025 and June 2026,
1,266 child protection calls were received, compared with 163
Adult Support and Protection calls. Adult calls covered concerns
including sexual abuse, emotional abuse and self-neglect,
indicating relatively low use of this route.
Prevent: Referrals requiring background health information are
directed to the Public Protection Service through the dedicated
PREVENT mailbox. Current activity focuses on improving staff
awareness of PREVENT and how to make a referral.
Adult Support and Protection: Adult Support and Protection
processes are being developed in line with established child
protection arrangements, including use of IRD and advice forms.
Activity is recorded and reported through MicroStrategy in Clinical
Portal. Introduced in February 2026, MicroStrategy supports
robust data reporting and scrutiny of ASP activity across NHSGGC.
Child Protection Supervision: During 2025–2026, a review of
Child Protection Supervision across NHS Greater Glasgow and
Clyde was undertaken using an appreciative inquiry approach.
Feedback showed strong commitment to supervision and broad
agreement on its value in supporting reflective practice,
professional confidence and decision-making. Preferred models
varied according to practitioner experience, local context and
individual preference rather than consensus on a single model.
The findings provide assurance on existing strengths and identify
opportunities to improve consistency, quality assurance and
continuous improvement.
SAER/Learning Reviews: The Public Protection Service supports
SAER and learning review activity, with progress reported through
the NHS GGC public protection governance structure. The
NHSGGC Cross-HSCP Quality Improvement Group monitors open
and closed Child Protection SAERs to support Board-wide
learning. The second annual SAER/Learning Review thematic
report will be presented to the Child Protection Forum in
September 2026.
Assessment of Care Toolkit: During 2025–2026, work focused on
supporting practitioners to use the Assessment of Care Toolkit.
Public Protection
29
Page 373 of 392

Page 374

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Since 2022 the Migration and Resettlement Strategic Group has
co-ordinated our local response to asylum dispersal and refugee
resettlement. This has enabled us to regularly and routinely share
information, and the identification and rapid response to issues as
they emerge.
Ukrainian Displaced Persons (UDPs)
The Council’s resettlement team currently support Ukrainian
Displaced Persons across Renfrewshire between hosts and the
community, social and private sector.
The Ukraine Permission Extension Scheme (UPE) opened on 4
February 2025, which enables UDPs to apply for an extension
when their current visa has 28 days remaining until expiry. If an
application is made after their current permission expires, even if
their application for UPE is successful later, the individual will
have no recourse to public funds (NRPF). This means they will lose
their current entitlements to work, rent and receive benefits.
These entitlements may be reinstated if you later receive a
positive response to your UPE application. As of March 2026, all
Ukrainian households in Renfrewshire had applied for the UPE.
Asylum Dispersal
The Council regularly meets with representatives from the Home
Office, Mears and Migrant Help in relation to people being
supported through the asylum process in Renfrewshire. Whilst the
Council has no direct role to play in terms of support during the
process, there is a core focus on safeguarding issues, community
support and cohesion.
There has been a steady increase in the number of individual
properties being utilised over the last 6-12 months. The Council
and Police Scotland are informed of the potential procurement of
a property by Mears and are asked to comment on location
suitability only in terms of an environmental scan undertaken by
Mears. Limited information is available on actual utilisation of
properties and by whom.
Migration and Asylum
30
Page 374 of 392

Page 375

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Police Scotland, Renfrewshire Performance
Incidents
Recorded
Common
Assault
Overall
Dishonesty
Domestic
Abuse
Overall
Violent Crime
Sexual
Crime
Missing
People
Housebreaking
Road Traffic
Casualties
Disorder
Complaints
Unless otherwise stated, all data provided within this report is for the period 1 April 2025 - 31 March 2026, with comparisons made against the same period in the
2024/2025 period. All statistics are provisional and should be treated as management information. All data have been extracted from Police Scotland internal
systems and are correct as at 20/04/2026.
- 6.2% + 4.5% - 1.1%
+ 8.2%
- 3.3%+ 11.3% + 5.4%- 5.8%
- 23.5% - 27.5%
48,180 1,910 3,646 1,441 194 5,871
490 136 723
2,288
Total Crime
+ 13.4%
17,167
Page 375 of 392

Page 376

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Police Scotland
Total Recorded Crime
Recorded crimes and offences increased by 13.4% in Renfrewshire
in 2025/26 (17,167). Although an increase was noted across most
crime categories (except crimes of dishonesty), the rise can largely
be attributed to an increase in proactivity. Crimes against society
(including proactive crimes such as bail offences, drug and weapon
carrying offences) increased by almost 16%, while road traffic
offences rose by over 13%. These two crime categories account for
83% of the variance between 2024/25 and 2025/26 figures.
Violence
Recorded violent crimes in Renfrewshire increased by 5.4%
compared to the previous year (2,288), with the majority (over 83%)
of recorded crimes of violence being common assault (including
against emergency workers). Almost 67% of these involved assault
to no injury to victims. Meanwhile, crimes of serious violence
(including serious assault, robbery, attempted murder and murder)
collectively rose by almost fourteen 14% on the previous year, with
14 more victims. Paisley Northwest continues to be the multi-
member ward with the highest number of recorded crimes of
violence occur. The volume of violent crimes committed within
private space has risen by 4.2% on the previous year, with almost
half of violent crime occurring within dwelling houses.
Weapons Offences
A total of 485 offensive/bladed weapons offences were recorded in
Renfrewshire during the reporting period, marking a 17.4% increase
on the previous year. The detection rate for weapon-related crimes
fell from 82.3% to 80.2%, however, a proactive approach to tackling
the issue of weapon-carrying has led to a 14% increase in the
number of detections for these crimes (n=49). Approximately 43%
of weapons were classed as sharp/bladed, with the remainder
consisting of other weapon categories including blunt weapons,
improvised or household items and tools. Police in Renfrewshire
continue to work with partners to educate young people about the
risks and consequences of carrying weapons, as well as to divert
them away from criminal activity.
Hate Crime
During 2025/26, 277 hate crimes were recorded in Renfrewshire,
with a detection rate of 70.4%. Race continues to be the most
targeted protected characteristic (61%). Threatening and abusive
behaviour and hate aggravated conduct (including stirring up
hatred) are the most-commonly reported hate crimes. Other
reported hate crimes include common assault, vandalism and
breach of the peace. A significant proportion of the victims of hate
crime are police officers.
32
Page 376 of 392

Page 377

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Police Scotland
Disorder and Antisocial Behaviour (ASB)
Recorded crimes of damage and reckless conduct in Renfrewshire
rose by 1.5% compared to the previous year, with vandalism
increasing by approximately five percent. Meanwhile, crimes of
wilful fireraising fell by over 35%, with 80 crimes recorded.
However, the detection rate for this crime type fell significantly,
falling from 43.5% last year, to 20% in the current reporting period.
A significant proportion (approximately half) of wilful fire-raising
crimes involved vehicles being set alight. Public-reported incidents
of anti-social behaviour and disorder dropped by 3.3%, with 5,871
incidents recorded. Police in Renfrewshire continue to engage in a
multi-agency response to ASB, building on the proactive work
carried out through the Partnership Hub and ensuring effective
plans are in place to address community risks.
Sexual Crime
490 sexual crimes were recorded in Renfrewshire in the reporting
period - an increase of 8.2% on the previous year (n=453). While
contact offences rose by approximately 20%, non-contact offences
fell by 1.6% - with many of these being cyber-enabled sexual
offences such as indecent communications or sending indecent
images.
Just over a quarter of sexual crimes recorded involved non-recent
reporting, with specific challenges associated with the investigation
and detection of such crimes, due to the passage of time and
resulting loss of various forensic opportunities. The detection rate
was 54.7%, compared to the national rate of 61.1%.
In 2025/26 there were 36 repeat offenders (compared to 42 in
2024/25) and 63 repeat victims of sexual crime.
Missing People
Ongoing collaboration with partner agencies has contributed to a
reduction of 27.5% in the total number of missing person reports in
Renfrewshire. 725 incidents were recorded in 2025/26, compared to
994 in the previous year. A total of 323 individuals were reported
missing - with 96 of these individuals being repeat missing people
(i.e. being reported missing on multiple occasions). 77% of missing
persons reports related to young people, with over 47% of all
reports involving care-experienced young people.
Police Scotland continue to engage with appropriate partners to
safeguard and reduce threat risk and harm to our most vulnerable
people, especially when they go missing.
33
Page 377 of 392

Page 378

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Police Scotland
Domestic Abuse
Domestic abuse incidents in Renfrewshire rose by 3.2% compared
to the previous year, totalling 2,163 incidents. We assess the
increase is highly likely attributable to increased usage of the DASA
legislation and improved investigative practices to identify abuse as
part of a course of conduct rather than individual/isolated acts. Of
domestic abuse incidents, 43.6% led to a recorded crime, with
related crimes rising by 11.3% to 1,441. The detection rate has
fallen slightly, falling from 68.9% to 68.6%.
The Multi-Agency Tasking and Coordination and Multi-Agency Risk
Assessment Conferences frameworks remain vital in safeguarding
victims, providing tailored support, coordinating partnerships, and
ensuring agency accountability. We continue to work together with
partners to ensure that victim centred approach adopting the most
suitable support to victims and families. (Refer to Equally Safe
Section).
Road Casualties
In the reporting period, there were 136 road casualties in
Renfrewshire, a decrease of 42 compared to the previous year. This
includes five less road fatalities (2) and 39 less slight road injuries
(73).
However, eleven more serious road injuries occurred (64), including
an increase of two serious child road injuries (8). A slight increase in
road casualties aged 66+, highlighting the increase in threat and
risk of harm to older members of Renfrewshire’s communities.
Police Scotland remains committed to reducing road casualties
through ongoing enforcement and education efforts. The dedicated
Road Policing Unit continues to support local policing through a
range of road safety and crime prevention campaigns.
Road Traffic Offences
Reflective of an increase (+14.3%) at the national level, recorded
road traffic offences in Renfrewshire have risen by 41.1% on
2024/25 figures, totalling 4,613 in the reporting period. The
detection rate for these offences is 88.9%, which remains closely
comparable to the previous year’s rate (86.8%) and the national
rate (87.5%). As part of the road safety strategy within the Division,
proactivity has significantly increased with a key priority to tackle
the issue of use of illegal electric vehicles, including e-scooters and
electric motorcycles.
34
Page 378 of 392

Page 379

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Police Scotland
Acquisitive Crime
A total of 3,646 crimes of dishonesty were recorded in Renfrewshire,
a decrease of 1.1% on the previous year. The detection rate was
38.9%, exceeding the national rate of 36.6%. Shoplifting accounts
for over 43% of all recorded crimes of dishonesty, with crimes of
this type rising by 6.3% on the previous year. Excluding this type of
crime, crimes of dishonesty have fallen by just over 6%, with crimes
of housebreaking falling by 5.8% and common theft by 21.7%.
Problem-solving initiatives are underway including a National
Retail Crime Task Force. This dedicated unit supports police officers
in delivering prevention activities and targeting repeat offenders.
Fraud remains a key concern due to evolving tactics used both
online and offline – with recorded crimes increasing by 4% on the
previous year. In Renfrewshire, consumer and retail fraud and
banking/credit industry fraud constitute a significant proportion of
recorded fraud crime, with other fraud methods in the reporting
period including advance fee payment frauds and bogus/doorstep
crime. Police in Renfrewshire continue to engage with the
community to raise awareness of emerging fraud methods and
provide practical advice to help individuals protect themselves
from financial harm.
Cyber and Digital Crime
Cyber-enabled crime remains a significant concern for communities
in Renfrewshire. Fraud continues to be the most recorded cyber-
enabled crime in terms of number of reports received, with over
28% of all recorded frauds being perpetrated online. We continue to
address this issue through local partnerships and national
collaboration with the Cyber Scotland Partnership and the financial
sector to raise awareness of online fraud.
Threats and extortion are another key cyber-threat in Renfrewshire,
with the majority (81%) of recorded extortion crimes being
cyber-enabled ‘sextortion’ crimes. Offenders (who are commonly
located out-with the UK) build trust through social media or
messaging platforms before making demands - often resulting in
serious emotional and financial consequences for victims.
Sexual offences constitute a significant proportion of cybercrimes,
with crimes such as communicating indecently, viewing sexual
activity or images, indecent photos of children and threats to
disclose intimate images. To combat online child sexual abuse and
exploitation, Police Scotland engage with specialist national units
and partner agencies to promote preventative awareness.
35
Page 379 of 392

Page 380

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Scottish Fire and Rescue Service, Renfrewshire Activity
Fires False Alarms
Total no. of
Incidents
First Aid /Hospital
Treatment (all incidents)
- 2.3% - 1% + 11.9%
- 2.9% - 41%
Road Traffic Collisions
* Data above is year on year change
Summary 2025-26
The activity totals and other statistics quoted within this report are
published in the interests of transparency and openness.  They are
provisional in nature and subject to change as a result of ongoing
quality assurance and review.  Because all statistics quoted are
provisional there may be a difference in the period totals quoted in
our reports after local publication which result from revisions or
additions to the data in our systems.  The Scottish Government
publishes official statistics each year which allow for comparisons
to be made over longer periods of time.
734 1165 66
2458 92
Page 380 of 392

Page 381

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Scottish Fire and Rescue Service, Renfrewshire Activity
Page 381 of 392

Page 382

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Scottish Fire and Rescue Service 
Community Safety and Engagement
Community safety and engagement activity continued to support
SFRS prevention priorities. Engagement activity aligned with
broader partnership objectives, supporting vulnerable individuals
and reducing the risk of future incidents. The sustained delivery of
preventative interventions reinforces SFRS’s commitment to early
intervention, risk reduction and long-term community resilience.
In partnership with the Scottish Ambulance Service and Save a Life
for Scotland CPR awareness sessions continue to be delivered. The
engagement helped build staff confidence in recognising cardiac
arrest and performing effective hands only CPR, strengthening our
ongoing partnership working.
The Electrical Safety Campaign took place throughout January
and February. Community Action Team has incorporated both
Register My Appliance Week and Electrical Fire Safety Week into
our ongoing prevention activities, in line with the SFRS Community
Safety Calendar. These themes continue to support our local
engagement work and help raise awareness of key safety
messages across our communities.
Our school engagement programme continues to engage with
Primary and Secondary Schools throughout Renfrewshire as part
of a structured programme created to deliver safety advice to
young people.
Home Fire Safety Visits
During 2025-26, 725 home fire safety visits (HFSVs) to homes
across Renfrewshire were completed. These visits involve SFRS
staff engaging with individuals within the home environment, to
identify potential fire risks and to provide appropriate advice and
education to improve their fire safety in the home. 
We have introduced new software for the recording of HFSVs and
will launch a new Partner Referral App which will make it easier
and more secure for our valued partners to make a referrals for
HFSVs to SFRS, for their clients. Partner referrals are important as
we know from experience that individuals involved in fatal and
serious fires are often known to our partner organisations but not
to SFRS.
38
Page 382 of 392

Page 383

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Strategic Focus 2026/27
COG will continue to regularly scrutinise and monitor performance across all
areas of community protection activity, focusing in on areas where there are
ratings are poor, there’s changes in referrals, incidents or concerns reported, or
where national research or legislation suggests improvements or change to
practice or multi-agency working.
COG will seek to ensure that performance and practice are scrutinised at a
strategic level, to identify what works well, to highlight any areas for
improvement, and to consider where further opportunities for early
intervention and prevention activity would achieve improved outcomes for
local people.
Moving forward COG will identify several specific priorities to be progressed
during 2026/27, in addition to ongoing activity. Our agenda will be flexible and
dynamic to incorporate any new or emerging areas of focus via spotlight
sessions.
39
Page 383 of 392

Page 384

Page 384 of 392

Page 385

PUBLIC 
To:  Council
On: 24 September 2026
__________________________________________________________________ 
Report by:  Chief Social Work Officer
__________________________________________________________________ 
Heading:  Sustainable Future Programme – Renfrewshire Health and
Social Care Partnership 
__________________________________________________________________
1. Summary
1.1. On 22 June 2026 Council “instructed the Chief Social Work Officer to deliver a
report to the next full Council meeting detailing the specific risks to service
users in Renfrewshire following the June 19th IJB cost-cutting decisions,
primarily driven by the Health and Social Care Partnership’s (HSCP)
persistent structural 14-million-pound funding deficit”.
1.2. Renfrewshire Council has delegated adult social care to Renfrewshire Health
and Social Care Partnership (RHSCP).  NHS Greater Glasgow and Clyde
(NHSGGC) has delegated a range of health services to RHSCP.  The
governance arrangements in relation to the delivery of these delegated rests
with the Integrated Joint Board (IJB).  Renfrewshire Council nominated four
elected members to service on the IJB and NHGGGC appointed four
members to the IJB.
1.3. Renfrewshire IJB agreed its sustainable futures approach at its meeting on 31
March 2023.  The sustainable futures approach includes the modernisation of
services as well as achieving a sustainable budget position for the future.
1.4. A range of Sustainable Futures proposals were presented on 19th June 2026. 
Prior to their consideration, members of the IJB considered a report on the
implications of financial recovery for RHSCP and the community it serves. 
The IJB was advised that a combination of increased demand and increasing
costs had resulted in RHSCP requiring to utilise financial reserves over the
previous three-year period in order to deliver a balanced budget.  It noted that
the reserves were likely to be exhausted in the next financial year (2027/28) if
action was not taken to address the funding gap. 
Item 10
Page 385 of 392

Page 386

PUBLIC 
1.5. The sustainable futures agenda was developed over a significant period by
the IJB and involved a range of engagement events with users of services,
carers, staff and members of the IJB.  The IJB recognised that the impact of
the sustainable futures agenda was not neutral but included elements of
redesign of services which would also deliver savings.
1.6. In developing the sustainable futures savings options, the IJB was provided
with a detailed integrated impact assessment (IIA) for each of the proposals. 
The integrated impact assessments included an Equality Impact Assessment,
a Fairer Scotland Duty Assessment and contained a view from professional
leads across social work and care and health services.  The IIAs also
reflected feedback from consultation with key stakeholders.
1.7. This report provides information on the specific risks to service users following
the decision by the IJB to agree to the recommendation to proceed with the
sustainable futures approach and the mitigations in place.
__________________________________________________________________
2. Recommendations
2.1. Council is asked to note:
[a] the sustainable futures approach was developed over a significant period
of time and agreed by the IJB after consideration of detailed integrated impact
assessments; and
[b] the sustainable futures approach was informed by extensive consultation
with users of services and carers.   
__________________________________________________________________
3. Background
3.1. Renfrewshire Health and Social Care Partnership (RHSCP) operates a range
of health services, adult social work and social care services delegated by
NHS Greater Glasgow and Clyde and Renfrewshire Council.  The governance
arrangements in relation to the delivery of these delegated rests with the
Integrated Joint Board (IJB).  Renfrewshire Council nominated four elected
members to serve on the IJB and NHGGGC appointed four members to the
IJB.
3.2. RHSCP has faced increased demand on services and increased cost of care
pressures over a number of years.  Over the past three years RHSCP has
required to utilise significant elements of financial reserves to ensure a
balanced budget.  The financial pressures and increasing demands are not
unique to RHSCP and are a factor for HSCPs and other public bodies across
Scotland.  Audit Scotland noted the context for IJBs in its finance bulletin
published in February 2026.
3.3. The Renfrewshire IJB was presented with a number of options in September
2024 under the sustainable futures approach.  The IJB was not able to agree
to the options presented and after discussion it was agreed the senior
leadership team within RHSCP should continue to develop the approach and
present options at a future meeting of the IJB.
Page 386 of 392

Page 387

PUBLIC 
3.4. The RHSCP senior leadership team engaged in engagement events with
users of services, carers, staff and member of the IJB over a number of
months.  The level of engagement opportunities offered alongside the depth
of access to the RHSCP senior leadership team was in my opinion amongst
the most intensive I have experienced in my career and in excess of that from
other HSCPs across Scotland.
3.5. The IJB was presented with two reports at its meeting on 19 June 2026 to
assist it in making decisions on the sustainable futures approach.  The first
report on presented information on the risks of RHSCP entering financial
recovery, and the second on sustainable futures.  
3.6. The report on sustainable futures contained proposals, which were approved
by the IJB in respect of 
• The redesign of older adult day services
• The redesign of learning and physical disability day services
• A review of the model of learning disabilities respite
• The closure of Flexicare
• The closure of Autism Connections
• The removal of the Assertive Outreach Model
• The removal of vacant health visiting posts
3.7. The report available to member of the IJB provided detail on each of the
options proposed and contained detailed integrated impact assessments
which set out the nature of the change proposed, the anticipated impact and
risk and the mitigations in place.  The integrated impact assessments included
an assessment of the strategic and policy impact, an Equality Impact
Assessment, a Fairer Scotland Duty Impact Assessment and a Children’s
Rights and Wellbeing Impact Assessment.
3.8. As Chief Social Work Officer I was invited to contribute a professional view on
each of the proposals.  The integrated impact assessments also contained
information on the engagement with users of services, carers, staff and trade
unions.  In all of the options considered I recognised there were no neutral
options.  It was however my view the proposals offered were considered and
balanced and offered the IJB with options which were deliverable in a safe
manner, protecting the wider services.  It should be noted that redesign and
modernisation was at the heart of a number of the proposals and the delivery
of a financial saving was an additional outcome.
Impact of the individual sustainable futures proposals
Redesign of older adult day care services
3.9. The driver behind the redesign of older adult day care services was to
modernise and reflect learning and demand from the experience of providing
a service during the COVID restrictions.  The review of older adult day care
services identified an over provision from too many locations and the impact
of a virtual option for some members of the community.
Page 387 of 392

Page 388

PUBLIC 
3.10. The proposal to reduce the number of locations will result in some service
users requiring to change the day care service they attend.  There will be
some impact on the time some service users spend on transport to the new
locations however this will not be significant.  There will be no loss of service
for individuals as the overall service provision was underoccupied.  There is a
potential impact on some individual unpaid carers as a result of the proposed
change in the service provision. Unpaid carers will be offered an additional
assessment of their own support needs in these circumstances.
3.11. As RHSCP moves forward with the implementation of the redesign individual
users of the service directly impacted will be supported through a transition
process to ensure their care needs continue to be met.  A similar approach
will be taken forward in relation to unpaid carers.  The planned date for full
implementation of the redesigned model of day care for older adults is 1 April
2027. 
Redesign of learning and physical disability day services
3.12. The proposed changes to learning and physical disability day services
developed as an approach to modernise the provision, alongside integrating
learning from the COVID19 pandemic.  The proposed changes will create an
integrated model of day care including community and complex care hubs.  
3.13. The proposed changes will result in the services being focused on individuals
in family-based care arrangements. There will be a realignment of locations
reducing dependency on multiple buildings.  The rationalisation of building will
provide a financial saving for HSCP and continue to allow individuals to
receive a service.
3.14. As with the older adult service there will be an implication for some individuals
in that they will have to travel to an alternative location.  The other individuals
who are impacted is a small number who are in supported accommodation
where their care arrangements.  These care arrangements included provision
for day care support to the individuals, and the proposed arrangement
reduces duplication. 
3.15. The new model will create further opportunities for community capacity
building by working with partners to support links to community organisations
and activities.  This is a progression of the service bringing it more into line
with national policy objectives.
3.16. The data provided on the use of learning disability and physical disability
confirmed over provision and contributed to the need for redesign to a more
modern and efficient service which will meet the policy objectives of
Renfrewshire HSCP and the Scottish Government. It seeks to enhance the
experience for those using the services. The issue of equity based on fair
access criteria is a useful addition to the assessment process for those who
perhaps need the service.
3.17. As the implementation of the redesign of learning and physical disabilities day
services individual users of the service directly impacted will be supported
through a transition process to ensure their care needs continue to be met.  A
similar approach will be taken forward in relation to unpaid carers.  The
planned date for full implementation of the redesigned model of day care for
older adults is 1 April 2027.
Page 388 of 392

Page 389

PUBLIC 
Review of the model of learning disabilities respite
3.18. This planned review will focus on revising the current respite model at
Weavers Linn, including a review of current allocations of overnight respite to
align with fair access principles.  The review of the model for delivering
learning disabilities respite has been in planning for a number of years and
was initially proposed following an independent review in 2019 which
highlighted a challenge around inequitable access to services
3.19. Some users of learning disabilities respite had historically high allocations
whilst others with similar needs were allocated lower levels.  The review will
focus on fair access to respite provision.  The review aims to ensure
standardised allocations for those with critical needs of 28 nights per year,
and those with substantial needs of 21 nights per year which is in line with
other Health and Social Care Partnerships across Scotland. This would mean
a reduction in access for some individuals, whilst creating capacity for others
to access respite at Weavers Linn where they are not currently able to do so
and reducing the likelihood of out-of-area respite placements. It would also
create capacity for an income generating bed which could be accessed by
other local authorities.
3.20. The individuals who are impacted a reduced access to respite will have their
care needs fully reviewed on a regular basis.
Closure of Flexicare
3.21. The Flexicare service provides social support and activities for adults with
learning disabilities, and some people with autism. This is in addition to core
day services. The service has experienced a reduction in use by individual
over the period of the development of the proposal to cease delivery of
Flexicare. 
3.22. Flexicare is a non-statutory service and is not delivered in any other RHSCP
across Scotland.  There will be 11 individuals directly impacted by the closure
of the service.  Individual care planning decisions will be taken forward to
minimise any negative impact.
Closure of Autism Connections
3.23. Autism Connections is a non-statutory service with a small staff team who
provide (i) practical advice and support to service practitioners supporting
adults with autism and their families; (ii) autism training to services within
Renfrewshire Council and the HSCP; (iii) raising awareness and knowledge of
autism within the general community; (iv) sharing best practice; and (v)
providing transition support for young people with autism moving from
education and Children’s Services into Renfrewshire’s Learning Disability
Services. 
3.24. The sustainable future plan is this service is closed.  The service does not
provide direct care to individuals and therefore there is no impact on care. 
The service provided advice and training for individuals and staff.  Alternative
advice option routes are available locally and families and individuals will be
signposted to alternative providers including the Renfrewshire Carers Centre,
Advice Works or Renfrewshire Citizen’s Advice Bureau.
Page 389 of 392

Page 390

PUBLIC 
3.25. The training offered by Autism Connections has influenced the programme of
training delivered by the Social Work Professional Training Team.  Further
discussions are ongoing with other services to consider how training for the
wider staff groups will be enhanced by the training previously provided by
Autism Connections.
Removal of assertive outreach model
3.26. This support is a non-statutory service model which is not replicated across
Scotland. Assertive Outreach is a multi-disciplinary team which focuses on
people on the Dynamic Support Register (DSR) and the provision of support
to services users, families and providers at times of crisis or transition. Since
the team was established, Delayed Transfers of Care for people with complex
learning disabilities have been reduced to, and are being sustained at, a very
low level achieving one of the key objectives of the model. 
3.27. The proposal under sustainable futures will result in the responsibilities
currently allocated within Assertive Outreach be reallocated across other
Renfrewshire Learning Disabilities Services (RLDS).  It is considered the
wider teams within RLDS retain the expertise required to continue to meet the
current objectives of the Assertive Outreach team.
Removal of vacant health visiting posts
3.28. The IJB agreed to remove 3.2 WTE posts in the health visiting service which
had been vacant since 2024.  The health visiting service has operated without
these posts for a significant period with minimum impact on overall service
performance.
Despite the posts being removed the Health Visiting Universal Pathway is
being maintained and targeted services for the most vulnerable children
remains a priority.
___________________________________________________________________ 
Implications of this report 
1.  Financial 
There are no direct financial implications as a result of this report.  The
sustainable futures approach will contribute to RHSCP achieving savings
and to deliver a balanced budget in future financial years. 
2.  HR and Organisational Development 
None. 
3. Community/Council Planning
None 
4.  Legal 
None. 
5.  Property/Assets 
None. 
6. Information Technology 
Page 390 of 392

Page 391

PUBLIC 
None. 
7.  Equality and Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations as it sets out the
potential implications of decisions taken by another statutory body. As
noted earlier in this report, RHSCP prepared integrated impact
assessments for consideration by the IJB when they reached their
decisions. 
8. Health and Safety
None. 
9. Procurement 
None. 
10. Risk 
None. 
11. Privacy Impact
None. 
12.  Climate Risk
None. 
13. Children’s Rights 
None. 
14. Cosla Policy Position 
None.     
List of Background Papers 
__________________________________________________________________ 
Author: John Trainer, Head of Children and Justice Social Work/Chief Social
Work Officer 
john.trainer@renfrewshire.gov.uk 
0300 300 0277   
Page 391 of 392

Page 392

Page 392 of 392