PUBLIC 
To:   Council
On:   24 September 2026
Report by:  Director of Finance and Resources
Heading:  Financial Outlook and Medium-Term Financial Plan
1. Summary
1.1 This report provides the Council with an updated medium-term forecast
financial position, covering the five-year period 2027/28 to 2031/32, and
the key assumptions and risks that underpin it. This update continues
to emphasise the ongoing challenging financial environment for local
government in Scotland and particular issues relevant to Renfrewshire
Council.
1.2 Successive financial outlook reports have highlighted the need for the
Council to continue to develop and deliver significant savings in order
to ensure ongoing financial sustainability, and this is still the case.
However, as the years of financial constraint continue, it is increasingly
difficult for any new savings proposals not to have a significant impact
on service delivery and on the communities that the Council serves.
1.3 This report provides an update on the forecast level of spend and
income over the medium term, and how these combine to provide a
projected recurring financial gap of c£38m by the end of 2031/32. 
1.4 The report outlines how specific reserves may be applied to support the
Council’s financial stability in the short term, and it also provides a
capital update that outlines proposed changes to the current capital
programme.
2. Recommendations
2.1 Note the economic updates outlined in Sections 3 and 4;

Page 2

PUBLIC
2.2 Note the key financial assumptions and projected medium-term
revenue position outlined in Section 5;
2.3 Note the savings update and agree the savings targets outlined in
Section 6;
2.4 Note the reserves update and agree the principles outlined in Section
7;
2.5 Note the financial risks to the forecast position outlined in Section 8;
2.6 Note the treasury and debt update provided in Section 9 and the long
term financial planning principles outlined to secure and support future
strategic investment; and
2.7 Note the capital update and approve revisions to the Capital Plan as
outlined in Section 10.
3. Economic outlook and Key fiscal events
3.1 As Members will be aware, there are a number of downside geopolitical
risks that continue to impact public finances, including ongoing conflicts
in Ukraine and the Middle East. This continues to bring volatility and
create uncertainty in global supply chains, and associated costs.
3.2 Twelve-month CPI inflation increased to 2.9% in July, coming from
energy, food and transport. Pay inflation remains high but is expected
to ease over the rest of the year. The Bank of England expects inflation
to rise later in 2026 before returning sustainably towards its 2% target
over the medium term.
3.3 At its July 2026 meeting, the Bank of England's Monetary Policy
Committee (MPC) voted to maintain Bank Rate at 3.75%, deciding that
uncertainty surrounding energy prices and the risk of renewed
inflationary pressures warranted a cautious approach. The Bank Rate
is expected to remain broadly at its current level in the short term.
3.4 Economic growth is expected to remain modest over the next two
years, with UK GDP growth forecast at 1.1% for 2026. While the
Scottish Fiscal Commission's (SFC) latest official forecast projects
Scottish GDP growth of 1.3% in 2026 and 2027, more recent
independent forecasts have revised expectations downward to around
0.8%-0.9%, reflecting the impact of higher energy prices, economic
uncertainty and weaker investment growth.

Page 3

PUBLIC
3.5 The SFC published its Fiscal Update in August 2026, in which they
note that the outlook for 2027/28 remains considerably challenging for
the Scottish budget. Their forecasts suggest that revenue spending
could fall after taking account of inflation, with capital spending
expected to fall further than planned. While the Scottish Budget has
benefited from additional resource linked to UKG decision on spending
for Special Educational Needs and Disability (SEND) in 2026/27, this
additional resource is one-off. The SFC is forecasting a fall in the real
terms value of the resource block grant in 2027/28 of 1.2%. This may
change depending on UK Government decisions at the UK Budget –
the arrival of a new Prime Minister and Chancellor may change the
previously understood fiscal strategy. 
3.6 Regardless of these, the outlook for the Scottish Budget is challenging.
Additional pressures from the income tax reconciliation mechanism
(outlined by the SFC as costing £720m in 2027/28), ongoing pay and
demand pressures, as well as Scottish Government policy
commitments will all bear on the 2027/28 budget.
4. Scottish Budget 2027/28 and Local Government Finance
Settlement
4.1 The Scottish Government’s Scottish Spending Review (SSR) published
in January 2026 alongside the 2026/27 Scottish Budget set out the
Scottish Government’s indicative revenue spending plans for 2027/28
and 2028/29, with an additional year (2029/30) for capital spend. The
spending review outlined a planned £1.5bn savings target over the
period, underpinned by plans for public sector reform and NHS
efficiencies.  The Programme for Government published on 1
September outlined potential changes to the structure of local
governance in Scotland, with engagement currently ongoing. At the
time of drafting, there is no clear indication as to how any preferred
model may affect the council’s financial position or outlook, therefore no
assumptions have been included. 
4.2 The UK Government Budget has confirmed that the UK Budget will be
announced on 28 October. This typically drives timelines around the
Scottish Budget, and it is expected the Draft Budget will be published
on 3 December. Members will be aware that the Council must agree its
budget and associated council tax decision by 11 March each year.
4.3 Renfrewshire Council’s settlement has benefited in the past year from
the area’s relative growth in population, and this is expected to
continue into 2027/28.

Page 4

PUBLIC
4.4 The latest population estimate was published in mid-July 2025. This
showed that Renfrewshire’s population increased again and now
stands at 189,270, an increase of 660 (0.3%) on 2024 and above the
national rate of just under 0.1%. This yearly increase is based on a
rebased figure for 2024 which was revised down slightly. Renfrewshire
remains the 9th largest Council in Scotland in terms of population. This
recent population increase places our estimated population at the
highest level recorded since 1980 and continues increases recorded
from the mid-2000s, however the rate of change has slowed
significantly compared to the period following the 2022 census. 
4.5 In terms of what this means at a strategic level: increased population
is generally positive, as people are choosing to move to Renfrewshire,
supporting the local economy, using services and contributing to their
communities. However, in line with the rest of Scotland, Renfrewshire
is experiencing a significantly ageing population, which leads to
demand pressures on health and social care services. This trend is
likely to become more acute as the top end of the working age
population moves into the 65+ cohort.
4.6 The Scottish Government’s January 2026 public sector pay policy
restated the 2025 position of a 9% increase over 2025/26 to 2027/28,
with an annual cap of 3%. The most recent local government pay
settlement agreed was for 4% in 2025/26 and 3.5% in 2026/27. In
recognition of this, the Scottish Government has committed to
reviewing the policy as part of the 2027/28 budget process.
4.7 The Scottish Government has made a number of policy commitments
which will impact on the local government settlement, including a
commitment to reduce class contact time for teachers, expand free
breakfast provision in schools, and extend the rights of care
experienced children under the Children (Care, Care Experience and
Services Planning) (Scotland) Act 2026. A core assumption of this
report is that the financial consequences of these commitments will be
fully funded by the Scottish Government.
5. Medium term forecast position and assumptions
5.1 The most recent financial outlook update reported to Council in
February 2026 covering the period 2026/27 to 2030/31, outlined gross
revenue pressures of c£80million by 2030/31 before any decisions on
council tax. This forecast was based on a number of key assumptions,
which officers continually assess in light of new information. The
updated core assumptions underpinning the forecast position within this
report are outlined in Table 1 below:

Page 5

PUBLIC 
Table 1: Core budget assumptions September 2026   
2027/28 2028/29 2029/30 2030/31 2031/32
Pay award  3.0% 2.5% 2.5% 2.0% 2.0%
Employer Pension
contribution rate (LG
employees)
6.5% 6.5% 6.5% 15.0% 15.0%
Non-pay inflation 0% 0% 0% 0% 0%
Contract inflation 2.0% 2.0% 2.0% 2.0% 2.0%
Revenue Grant 1.0% 0.5% 0.5% 0.0% 0.0%
Council tax (rate) 6.5% 6.5% 6.5% 6.5% 6.5%
Council tax (base) 0.7% 0.8% 0.7% 0.6% 0.6% 
Pay
5.2 The current pay settlement for teaching staff covers the period up to
July 2027 (3.25% from 1 August 2026) and for local government (non-
teaching) staff the agreement until 31 March 2027 was 3.5%. The
assumptions for pay over the medium term are noted above. For
context, each 1% pay award across both the teaching and non-
teaching workforce would cost an estimated £3.5m per year.
5.3 On top of pay inflation, the Council’s pay bill also includes employer
NICs and pension contributions. The Council’s current employer
contribution rate to the Strathclyde Pension Fund is 17.5%, however,
the current triennial valuation process will confirm rates for the next
three-year period. The assumption in this Financial Outlook is that the
17.5% rate will reduce to 6.5% over the next three year triennial
revaluation period. This position is not at the time of drafting confirmed
by Strathclyde Pension Fund, however it is expected the position will be
determined by the end of September. The indication from SPF is that
the long term employer contribution rate is expected to be 15%,
however due to the current well-funded position, the contribution rate
could be reduced to 6.5% in the short to medium term. There remains
uncertainty with this however, and a risk remains for the Council that an
increase back to the longer term rate may be required in 2029/30. In
this case, the Council would require to reinstate the budget back to the
15% rate in a relatively short period of time. This would present a
significant challenge, and it is anticipated that the use of ringfenced
reserves could be required to smooth this position.

Page 6

PUBLIC
5.4 The employer contribution rate for the teachers’ pension scheme is also
currently the subject of an actuarial valuation, however the formal
position on this is unlikely to be agreed until early 2027. There was a
substantial change in the employer contribution rate in England
following the actuarial revaluation – the rate will reduce from 28.68% to
17.68% from 1 April 2027. The current rate in Scotland is 26%. For the
purposes of this report, it is assumed that any change in the employer
contribution rate will be matched by an equivalent change in revenue
grant funding.
Non-pay costs
5.5 The Council has a long-standing principle of no general inflationary
uplifts being funded, with an expectation that Directors and their
management teams will seek ongoing efficiencies in order to meet
general inflationary pressures. This position has been significantly
tested in recent years as both general inflation (as indicated by CPI)
and construction cost inflation have both breached into double figures.
Utilities in particular have seen large increases in cost; along with road
fuel and costs associated with waste recycling and disposal.
5.6 The pressure on these budgets, along with other above inflation costs
linked to conflicts in Ukraine and the Middle East, has resulted in a
position where some costs have exceeded available budgets despite
the best efforts of officers. This has been particularly prevalent in
Children’s Services transport costs, as well as services delivered by the
Environment, Housing and Infrastructure service; and the resulting
overspends have been robustly scrutinised by relevant Policy Boards. 
5.7 In closing the 2025/26 position, the Council added £1m to its
Unearmarked General Fund balance to address some of this expected
price volatility; however, the Council continues to face a number of
expenditure risks, which are outlined in more detail in section 8 below.
5.8 Owing to revenue spending pressures the Council has had a long
period of only basic buildings maintenance being in place. This has
resulted in a position where the overall condition of the estate is
deteriorating; most pressingly in the schools estate but also across
other areas of public buildings including the leisure estate. The lifecycle
maintenance and repairs budget has been increased over the past two
years to address the scale of backlog and other repairs, and a further
recurring £0.5m could be incorporated for this purpose in 2027/28.

Page 7

PUBLIC
5.9 The cost of running the local government election in May 2027 is
estimated at £0.6m. As this is non-recurring, it is assumed that this will
be funded from reserves, rather than adding to the recurring base
budget and then removing it in 2028/29.
Education costs
5.10 Members have agreed a learning estate strategy that includes a
business case process to support and inform schools and early
learning estate investment decisions. As reported to the Education and
Children’s Services Policy Board in May 2026, a number of business
cases are underway for the next phase of the programme – Trinity High
School, Johnstone High School, and Johnstone Primary School Estate
projects. In addition, both the expanded Park Mains HS and Thistle PS
will become operational in August 2027. Both teaching and running
costs have been incorporated into forecast spend.
5.11 Following agreement of the 2026/27 budget, a further pressure
emerged around Additional Support Needs demand within schools, with
a £0.2m investment agreed to be funded from reserves, with inclusion
in the base budget from 2027/28. However the scale of this pressure
has escalated during the current year. Renfrewshire Council has a rate
of ASN demand (45% in 2025) that is higher than national average in
Scotland, and the complexity of need means that in many cases a 1:1
support ratio needs to be in place. This pressure will continue to be
closely monitored.
5.12 Across both ASN and mainstream school transport provision, the
budget has come under severe pressure as tendered costs increase
from private providers. Additional budget of £3.6m has been added in
the past 2 years; however, the most recent forecast position for the
2026/27 outlines a further overspend of £0.8m. An additional recurring
budget of £1m has been included in the outlook position for 2027/28.
This means that spend on school transport has practically doubled in 4
years, predominantly linked to cost increases rather than increased
numbers of children travelling. This level of cost increase will be difficult
to contain without impacting on other Council service budgets and
services.  
Borrowing costs
5.13 The Council’s strategic aspirations in terms of the learning estate and
infrastructure (where this is not grant funded) will require to be
appropriately resourced in the revenue budget to support prudential
borrowing and revenue contributions to capital.

Page 8

PUBLIC
This issue is outlined in more detail in section 9 below, however the
forecast position includes an increase in loans fund costs each year for
the full forecast period – potentially taking the ratio of debt to net
revenue stream from 2.9% to 5.3%. This approach will provide the
Council with the ability to lock in capital investment capacity to support
long-term strategic investment planning. 
Income
5.14 The Scottish Government’s MTFS indicates an average 2.7% cash-
terms increase to the local government settlement over the period of
the plan. However, the MTFS, similar to the Council’s plans, shows a
deficit position. Therefore, the Scottish Government will need to make
savings or reduce planned spend over this period, potentially adjusting
its expenditure plans to remain within available resource. On balance,
the Council’s base forecast for revenue grant is therefore ‘flat-cash’.
Given the scale of the budget gap projected by the Scottish
Government, this forecast may be on the optimistic side, and this
position will be kept under close review. The Council should however
benefit in terms of distribution from an overall increase in share of the
Scottish population.
5.15 In relation to council tax, Council previously agreed a core assumption
of 6.5% increases for the remainder of the current administration
period, noting that this decision would be for Council to take on an
annual basis when setting each budget. This assumption remains the
case across the five-year period covered here. Members will be aware
that council tax is a key element of agreeing a balanced budget, so
some variation from this core assumption is likely, depending on how
other areas of spend and income move.
5.16 In setting the 2026/27 budget, an ongoing level of income from DEFRA
in relation to the PackUK waste disposal packaging scheme was
baselined. In recognition that this income may reduce over time as
suppliers produce less packaging, there is an assumed 5% reduction in
this income stream each year within the outlook position.
5.17 The Council has agreed to develop a Visitor Levy scheme proposition
for Renfrewshire. While the Council has yet to make a formal decision
as to whether to introduce the levy, given the statutory timescales
involved around consultation and implementation, the likely earliest
date for potential implementation would be April 2029. Within the
outlook position, a new income stream of (prudently) £1m, which is net
of administrative costs, has been included in 2029/30.

Page 9

PUBLIC
It is expected a proportion of this funding will require to be invested in
visitor related services and infrastructure.
5.18 Council officers will continue to work towards a principle of full cost
recovery for services, setting fees and charges in line with this
principle. An increase of 5% per annum has been in place for a number
of years and this level is assumed to continue over the medium term.
Officers will also explore other options for increasing income, or
introducing new income streams, such as the visitor levy.
Gross revenue position
5.19 The cost assumptions above result in the projected revenue position
outlined in Table 2 over the next 5 years i.e. before any decisions on
further savings, but inclusive of an assumed level of council tax
increase in line with the core assumptions in Table 1 above.
Table 2: Summary medium term forecast
Summary medium term forecast -
September 2026 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32  
£m £m £m £m £m £m
Opening base budget gap/(surplus) (3.2) (6.9) (3.5) 5.3  12.7  29.9 
New pressures:          
Pay 15.4  10.7  9.3  9.3  17.9  7.8 
Non-pay 14.8  10.1  9.1  8.5  7.0  6.0 
Borrowing 5.3  5.0  3.5  3.5  3.5  4.5 
Asset maintenance 1.5  0.5         
Gross pressures 33.8  19.5  18.4  26.5  41.1  48.2 
Savings:          
Fees & Charges 5% (0.3) (0.3) (0.3) (0.4) (0.4) 0.6 
Council Tax base increase (0.6) (1.0) (1.1) (1.1) (0.9) (1.0)
Corporate and service savings (2.5) (10.6) (2.9) (3.1) (1.8) (1.0)
Total Savings (3.4) (11.9) (4.3) (4.5) (3.1) (1.4)              
Sub-Total 30.4  7.6  14.0  22.0  38.0  46.8 
Increase in SG revenue grant (23.9) (3.7) (1.9) (1.9) 0.0  0.0 
Baseline EPR funding (4.4) 0.2  0.2  0.2  0.2  0.2 
Budget gap prior to CT decision 2.1  4.1  12.4  20.3  38.1  47.0 
CT increase (6.5% from 27/28) (9.2) (8.6) (8.2) (8.8) (9.4) (10.1)
CTR requirement  1.0  1.1  1.2  1.2  1.3 
Recurring budget gap/(surplus) (7.1) (3.5) 5.3  12.7  29.9  38.2 
Recurring Motion Investment 0.2  0.0  0.0  0.0  0.0  0.0 
Net recurring budget gap/(surplus) (6.9) (3.5) 5.3  12.7  29.9  38.2 
Agreed one-off spend 7.9  0.0  0.0  0.0  0.0  0.0 
Use of reserves 1.0  (3.5) 5.3  12.7  29.9  38.2

Page 10

PUBLIC
5.20 The position for the current financial year is shown for information;
however, it can be seen that the Council has agreed a budget that
returned to a positive recurring financial balance in 2026/27.
5.21 While the return to a recurring balanced position in 2026/27 is positive,
without further substantial savings being delivered, a financial gap is
projected for 2028/29 of £5m, increasing to £38m by 2031/32. For
clarity, this is after the assumed council tax increases in Table 1 above.
It is also worth highlighting, the above analysis makes no provision for
additional financial support to Renfrewshire IJB – this financial risk is
explored in further detail in section 8 below.
5.22 The Council will have choices in how to address the financial gap,
however these will essentially be restricted to three main themes:
reduce planned spend (specifically, that spend which is within the
Council’s control); generate savings to offset the forecast increase in
cost; or increase income. For context, each 1% increase in council tax
generates c£1.1m. The most likely solution will be a combination of all
three.
5.23 There would also be a short-term option in terms of utilising reserve
balances to temporarily close the gap, however the underlying financial
gap would remain to be addressed on a recurring basis. As has been
discussed in many previous reports, the use of reserves to achieve
financial balance can only ever be a short-term option, which should
only be agreed in circumstances where planned and agreed recurring
savings, required to achieve recurring balance, cannot be delivered in
line with the financial gaps emerging. These issues are explored in
further detail below.
6 Savings
6.1 Previous financial updates have outlined the measures the Council has
taken to deliver substantial savings in recent years from transformation
programmes, financial sustainability workstreams and corporate
financing measures such as adjustments to the Council’s long term
debt smoothing strategy.
6.2 Action taken by the Council since 2011/12 has generated substantial
levels of saving totalling £193m, however as has been reported
previously, in each successive year it is increasingly difficult to continue
to generate savings at scale. From an average saving of £19.5m per
annum in the period from 2011/12 to 2014/15, the average saving over
2022/23 to 2026/27 was £5.8m.

Page 11

PUBLIC
As outlined above however, without continuing significant levels of
saving being generated, there is a risk the Council will not remain
financial sustainable. There is a significant anticipated saving in
2027/28 linked to the reduction in the employer pension contribution
rate outlined at 5.3 above, estimated at £8-9m. 
6.3 As outlined in the most recent Reshaping Renfrewshire report, key
areas of focus for the Council in terms of transformation will be: to
reshape how we use council assets, reimagining the role they serve
within our communities; to drive long term economic growth and
address the climate transition journey; to develop our strategic
partnerships to support delivery of shared goals; and to secure a digital
agenda that drives the delivery of large-scale savings whilst also
transforming how we work, how we use data to inform our decisions,
and improve our service delivery to, and choice for our citizens.
6.4 In respect of the digital agenda specifically, it has been recognised that
artificial intelligence may provide substantive potential for service
change. The Council is concluding the appointment of a supplier to
support the Council’s AI Transformation Programme. Regular updates
on the AI Transformation Programme will be reported to the Leadership
Board at key points throughout the programme, including a six-monthly
‘AI Transparency Report’ outlining the AI tools used by the Council, the
purpose, and function of each system, any data-protection or equality
assessments undertaken, changes since the previous report, and any
identified risks, mitigations or recommendations for future deployment. 
6.5 The phasing of resulting financial savings is included in the forecast
outlook position, from 2028/29 to 2030/31, targeting c£4.8m in total.
This is net of anticipated recurring costs. The delivery of these savings
is also predicated on a requirement for short-term investment to
facilitate the transformational change necessary, and the Council
maintains a Service Modernisation Fund for this purpose. Savings
delivery on this scale is contingent on wide adoption of AI technology
across services, and robust vacancy management as services take
advantage of the service reconfiguration possible through the use of AI.
6.6 A recurring financial gap remains over the medium term, meaning
further work will be required to secure the Council's long-term financial
sustainability. The savings identified within this report should therefore
be viewed as an initial programme, with additional proposals to be
developed as the financial outlook becomes clearer. In the shorter
term, reserve balances may be required to support financial stability
while longer-term solutions are implemented.

Page 12

PUBLIC
7 Reserves
7.1 The planned use of reserves as a support to the Council’s medium-
term financial position has been outlined in previous reports as likely to
be required; and the analysis above clearly demonstrates this
requirement over the medium term. The application of reserves is a
legitimate tool in managing temporary financial challenges and securing
immediate financial stability while the design and delivery of well-
managed sustainable savings are generated to match financial
pressures; it cannot, however, be more than a short-term measure.
7.2 In summary, the Financial Sustainability reserve will be the prime
source of financial stability support over the medium term. The balance
on this reserve coming into 2026/27 was £35.8m. Delays with the
achievement or non-achievement of savings will require to be
supported through the application of this reserve.
7.3 Members should continue to recognise the risk that savings may be
delayed or deliver less benefit than anticipated, and should prudently
plan for this eventuality. In addition, Members’ attention is drawn to the
significant financial risks outlined in section 8 of this report, in particular
the ongoing risk posed by the financial outlook of Renfrewshire HSCP.
7.4 While there remain uncertainties in much of the analyses above, it is
helpful to reiterate previously agreed principles in terms of the planned
use of specific reserves which could be deployed to support the
Council’s medium- term financial position, namely that: 
o There should be no planned use of unallocated reserves, which are
held as a risk contingency (however the Council took a deliberate
decision to increase unallocated balances by £1m in closing 25/26
in recognition of specific cost volatility – up to £1m therefore could
be applied in 26/27 to fund known pressures);  
o Unallocated reserves should be maintained at a minimum of £10m
(c2.0% of net running costs) over the medium term; and
o The Council commits to the planned use of the Financial
Sustainability reserve to support the medium-term financial position,
and in the interim, develops and implements plans to address the
forecast structural financial gap in a sustainable manner.

Page 13

PUBLIC
7.5 Updated revenue outlook reports will continue to be provided to future
Council meetings, including the annual budget setting meeting,
incorporating the confirmed level of Scottish Government revenue
support in 2027/28, plus any revised financial assumptions and any
variation in the requirement to utilise ring-fenced reserve balances from
that outlined here.
8 Risk management
8.1 The most recent financial overview report to the Finance, Resources
and Customer Services Policy Board outlined a projected revenue
overspend in 2026/27 of £6.0m. This includes a projected overspend
with Adult Social Care services managed by Renfrewshire IJB of
£5.1m; with remaining Council services therefore projecting an
overspend of £0.9m.
8.2 There are a number of financial risks which the Council is facing in-year
that have the potential to significantly affect the forecast outturn
position outlined above:
i. Pay inflation - Provision has been made in the budget for a level of
pay uplifts based on affordability, and the prospect of reducing
inflation; however, given current economic volatility, there is some
likelihood that this provision will be insufficient. Any costs over and
above budgeted levels will require to be funded from reserve
balances in-year, with adequate provision requiring to be made in
future budgets.
ii. Reduced class contact time – the Scottish Government has outlined
its intention to reduce teacher class contact time from 22.5 hours to
21 hours per week, starting with primary schools from August 2027.
Officers in Children’s Service are currently developing plans,
however early indications are that the additional cost could be in the
order of £3-4m per annum. The working assumption is that this will
be fully funded by the Scottish Government as a new burden;
however, this is yet to be fully confirmed on a recurring basis. One-
off preparatory work funding will be made available to councils
during 2026/27.
iii. Renfrewshire IJB – as has been previously reported to members,
Renfrewshire IJB continues to face significant cost pressures, with
the June report to the IJB outlining a projected year end overspend
of £5.1m for 2026/27. A recurring financial gap of c£12m is forecast
for 2027/28, some of which could be offset through the applications
of remaining reserves.

Page 14

PUBLIC
IJB officers continue to implement savings through the Sustainable
Futures plan, with a number of service changes being required to
mitigate the projected overspend. This work is ongoing, however
the difficulties in securing recurring savings at the scale required is
not to be underestimated. For Adult Social Care alone, pay inflation
averages £0.950m per year for the next 5 years.    In addition,
based on the report to the IJB in March 2026, it is estimated that
IJB reserve balances will be fully exhausted during 2027/28,
potentially requiring both the Council and NHS Greater Glasgow &
Clyde to provide significant additional support. Council officers
continue to engage regularly with IJB officers to ensure appropriate
visibility of the forecast position. Members will be aware that in
terms of risk scoring, the Council, similar to all councils across the
country, now has IJB financial sustainability as its highest financial
risk given the potential for this issue to impact severely and directly
on the Council’s financial stability.
iv. Waste Disposal Costs – the Council deals with multiple streams of
recyclate disposal on a daily basis, and contracts with suppliers to
collect and process this waste. Many of these waste streams have
generated income for the Council in past years, but currently the
majority present a significant cost to the Council. The position,
however, is subject to frequent change, linked to global supply
chain needs, leading to market sensitivity. Consequently, a further
recurring sum is not recommended in the base budget; rather
Members are asked to approve the principle that adverse
fluctuations in these costs can be managed by drawing on the
Financial Sustainability Fund, if there is no available capacity in the
in-year service revenue budget. The proposed development of a
transfer station as outlined below would help mitigate this financial
risk, but not extinguish it.
v. The Children (Care, Care Experience and Services Planning)
(Scotland) Act 2026 received Royal Assent on May 15, 2026,
following approval by the Scottish Parliament. Its provisions extend
accommodation support and continuing care for care experienced
individuals up to age 26 in certain circumstances. It is assumed
within the medium term outlook position that new burden funding
will be forthcoming from the Scottish Government to support
additional costs arising from these new requirements.

Page 15

PUBLIC
vi. Savings delivery - Directors and their management teams continue
to try to manage as efficiently and effectively as possible within a
highly constrained financial envelope; however this is becoming
increasingly difficult following 15 years of savings delivery at scale
and a continually volatile financial environment. This increased level
of financial risk further supports the requirement to hold a prudent
level of unallocated reserves.
9 Treasury management and debt
9.1 The medium term forecast position outlined in the sections above
contain an assumed increase in the funding required to support
borrowing which is a prerequisite to ensuring the Council’s ambitious
capital plans remain affordable and financially sustainable. It will be
critical for the Council to understand not just the capital costs
concerned and the risks inherent in managing these (see section 10
below); but also in ensuring that the revenue consequences of that
investment are affordable and are appropriately provided for within
council revenue plans.
9.2 Prior to agreeing any capital project; and as has been explicitly
approved in the context of the learning estate strategy, the Council
must as part of its business case gateway process ensure that
appropriate provision has been made in future revenue plans to fund
both borrowing costs and any increased operational costs resulting
from capital investment.
9.3 It is recognised that increased investment in the council’s asset base is
both desirable and essential, however investment decisions must be
taken in the context of the current constrained financial environment.
Increases in revenue support for borrowing will inevitably result in
choices between capital investment and dealing with ongoing service
pressures and priorities. Any increase in property related costs should
aim to be mitigated by rationalisation in the size of the council’s
property portfolio – in line with the principles of the property asset
management strategy. A reduced number of better condition buildings
from which to deliver services should remain the aspiration.
9.4 Members have been advised previously that the Council has one of the
lowest debt-to-revenue spend ratios in Scotland. The ratio at the end of
2025/26 was 2.8%, whereas the Scottish average sits around 6%.
There is no target rate; this is determined by a range of factors around
historic levels of investment, historic borrowing rates, timing of
investment decisions, and other non-financial factors such as overall
estate condition and local priorities.

Page 16

PUBLIC
This low rate does not mean that we have excess funds available, as
what the Council is not spending on serving debt, it is spending on
delivering services. This is very important to understand moving
forward. Given there is a clear aspiration to improve the estate, this will
mean less revenue funding available for service delivery.
9.5 Supporting substantial future capital spend (and therefore borrowing)
requires a commitment from the Council over a long period to prioritise
revenue provision for loan charges as a core principle of its budget
strategy. Steadily increasing loans fund budgets in this way locks-in
revenue resources as part of financial planning to provide certainty of
future borrowing capacity, and also generates short-term investment
from CFCR contributions in advance of new loan charges commencing,
thereby increasing the overall capital funding available.
9.6 The Council’s 2026/27 budget was agreed incorporating an increase in
provision for borrowing costs of £3.0m; with a further commitment of
similar increases in future years. Setting aside funding at least on this
scale will be a precursor for any decisions for further at scale
investment in the property estate. This is both required over the
remainder of the current Council administration term in order to
underpin the learning estate strategy but will also need to be
established as a fixed feature of the Council’s very long term financial
planning arrangements to secure ongoing investment capacity over the
next 20 years. The outlook position assumes a baseline of additional
loan charges provision of £2.5m per year.
9.7 Successive treasury management reports to Council have outlined that
the Council’s borrowing strategy is to firstly use internal cash balances
to fund the capital investment programme. This strategy remains,
however internal cash balances have been depleted, and it is likely that
external borrowing will be required in the medium term. Any external
borrowing will be undertaken in line with the Council’s agreed treasury
strategy. The current relatively high interest rate environment will be an
influence on the timing of borrowing decisions, however there may be
circumstances where the Council requires to borrow externally in the
relative short term, potentially increasing costs in that period.
10 General Fund Capital Programme
10.1 The Council continues to deliver its ambitious capital programme,
incorporating the delivery of significant investment in cultural venues
and wider infrastructure linked to City Deal projects and Levelling Up
Funding; as well as major improvement and expansion projects in the
school estate.

Page 17

PUBLIC
10.2 Council has agreed its learning estate strategy which continues this
level of ambition over the medium to longer term; with an initial planned
spend in the order of £170m over the initial phase of the strategy. With
early business cases underway for this phase, and construction
inflation a considerable factor over time, it is becoming apparent that
this sum will be insufficient to support the Council’s ambitions, and
therefore work is ongoing to assess what additional borrowing capacity
will be required going into the 2027/28 financial year.
10.3 An outline business case for a new waste transfer station was
approved at the August meeting of the Infrastructure, Land and
Environment Policy Board. An estimate of just under c£6m total cost is
included in the recommended development option. To fund this, the
Board also agreed to recommend the drawdown of £3.6m from the
Financial Sustainability Fund to support this capital investment and that
the remaining capital cost is funded from prudential borrowing. It should
be noted that this early estimated cost is subject to change as the final
business case is progressed, however it is recommended that the
Capital Plan is updated to reflect this investment.
10.4 Members should remain alert to the fact that major capital investment
projects bring an inherent level of financial risk and further costs may
emerge as they are delivered and contractually concluded. It remains
possible that costs may be incurred in excess of agreed budgets within
the existing capital plan given the scale and nature of the Council
capital programme and growing incidence within the construction
industry of contractors pursuing contractual claims, reflecting the
ongoing financial pressures and volatility being experienced. 
10.5 Where budgets are expected to be exceeded, appropriate approval will
be sought to adjust the capital plan to reflect these costs with any
consequential impact on the overall capital plan or revenue
consequences being clearly articulated.
Implications of the Report
1. Financial – the report highlights the scale of the short and medium
term financial challenge the Council faces. The development and
implementation of savings options at pace and scale will be critical to
the ongoing financial sustainability of the Council. The report indicates
a projected recurring financial gap of c£38m by the end of 2031/32.
2. HR & Organisational Development – the medium term financial
position and associated savings plans require to align with workforce
plans to ensure the size and composition of the workforce remains

Page 18

PUBLIC
appropriate and affordable.
3. Community/Council Planning – the Council requires to remain
financially sustainable in order to deliver on its priorities as outlined in
the Community and Council plans; and these plans in turn require to
inform the financial strategy.
4. Legal – the Council is legally required to set a balanced budget.
5. Property/Assets – the report outlines investment that aims to ensure
the Council’s property asset base is efficient and properly maintained.
6. Information Technology – the report outlines the digital agenda,
including AI, as a critical factor in the delivery of future savings,
efficiencies and improved customer service.
7. Equality & Human Rights - The recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report, however
the report highlights the need for the Council to continue to make
substantial savings which may impact on service delivery. Each
savings proposal will be individually assessed for any impact on
equalities and human rights.
8. Health & Safety – none arising directly from this report.
9. Procurement – none arising directly from this report.
10. Risk – as outlined in the report the Council’s financial sustainability
risk remains relatively high, and increased in the short term due to the
potential financial implications arising from the Renfrewshire IJB’s
financial outlook.
11. Privacy Impact – none arising directly from this report.
12. Climate Risk – none arising directly from this report.
13. Children’s Rights – none arising directly from this report.
14. Cosla Policy Position – none arising directly from this report.
Author: Alastair MacArthur, Director