Agenda Document Pack - Midlothian Council - 22/09/2026

Midlothian Council · 22 September 2026
Back to Midlothian Council — 22 September 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Notice of Meeting and Agenda 
Midlothian Council 
Venue:  Normandy Court/ Hybrid, 
Normandy Court, Normandy Drive, Dalkeith, EH22 1GJ 
Date:  Tuesday, 22 September 2026 
Time:  11:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone: 
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.Midlothian.gov.uk 
Page 1 of 260

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item and
the nature of their interest. 
4          Deputations 
No items for discussion 
5          Minutes
5.1 Minute of the Midlothian Council meeting of 23 June 2026 -
submitted for approval 
5 - 34 
Private Minute Addendum of the Midlothian Council meeting of 23
June 2026 - submitted for approval 
5.2 Minute Volume Index - submitted for consideration  35 - 36
5.3 Public Action Log  37 - 40 
Private Action Log 
6          Questions to the Council Leader 
No items for discussion 
7          Motions
7.1 Forces Children’s Rights Charter  41 - 42
7.2 Equipped for Learning (EFL) Programme  43 - 44
7.3 Clean, Safe and Respectful Communities  45 - 46 
8          Public Reports
8.1 Financial Monitoring 2026/27 - General Fund Revenue, report by
Chief Financial Officer and Section 95 Officer 
47 - 62
Page 2 of 260

Page 3

8.2 Housing Revenue Account - Revenue Budget and Capital Plan
2026/27, report by Chief Financial Officer and Section 95 Officer 
63 - 68
8.3 General Services Capital Plan - 2026/27 Quarter 1 Monitoring,
report by Chief Financial Officer and Section 95 Officer 
69 - 84
8.4 Housing and Building Maintenance Update 2026, report by
Executive Director Place 
85 - 104
8.5 Midlothian Strategic Housing Investment Plan 2027/28 - 2031/32,
report by Executive Director Place 
105 - 146
8.6 Midlothian Council’s Housing Services Assurance Statement 2026,
report by Executive Director Place 
147 - 156
8.7 All Through School and its Associated Catchment Areas at
Shawfair Consultation Report, report by Executive Director
Children, Young People & Partnerships 
157 - 162
8.8 Education Annual Plan and Report, report by Executive Director
Children, Young People & Partnerships 
163 - 210
8.9 Edinburgh and South East Scotland City Region Deal (ESESCRD) -
Regional Partnerships Proposition, report by Executive Director
Place 
211 - 248
8.10 Schedule of Meeting Dates: August 2027 - June 2029, report by
Chief Officer Corporate Solutions 
249 - 260 
Exclusion of Members of the Public
(A) TO CONSIDER RESOLVING TO DEAL WITH THE UNDERNOTED
BUSINESS IN PRIVATE IN TERMS OF PARAGRAPHS 1, 4, 8, 9 AND 10
OF PART 1 OF SCHEDULE 7A TO THE LOCAL GOVERNMENT
(SCOTLAND) ACT 1973 - THE RELEVANT REPORTS ARE THEREFORE
NOT FOR PUBLICATION; AND
(B) TO NOTE THAT NOTWITHSTANDING ANY SUCH RESOLUTION,
INFORMATION MAY STILL REQUIRE TO BE RELEASED UNDER THE
FREEDOM OF INFORMATION (SCOTLAND) ACT 2002 OR THE
ENVIRONMENTAL INFORMATION REGULATIONS 2004. 
9          Private Reports
9.1 Hopefield Economic Development Site Development, report by
Executive Director Place 
9.2 Beeslack Replacement High School Contractor Appointment, report
by Executive Director Children, Young People & Partnerships 
9.3 Ironmills Park, Cemetery Road, Dalkeith - Outline Options for the
Steps and Path, report by Executive Director Place 
9.4 Award of South of Scotland Electric Vehicle (EV) Charging
Infrastructure Delivery Partner Concession Contract, report by
Executive Director Place 
Page 3 of 260

Page 4

9.5 Ladywood Community Centre - Pitch Improvements, report by
Executive Director Place 
9.6 Recruitment of Chief Officer Place, report by Executive Director
Place 
10    Date of Next Meeting 
The next meeting will be held on Tuesday 10 November 2026 at 11am. 
Page 4 of 260

Page 5

INTERNAL USE ONLY
DRAFT BY/DATE: 
REVIEW BY/DATE:
1-993 
Minute of Meeting 
Midlothian Council
Tuesday 22 September 2026
Item No 5.1 
Midlothian Council 
Date Time Venue
Tuesday 23 June 2026 11.00am  Council Chambers, Normandy Court
and Hybrid 
Present: 
Deputy Provost Bowen (Chair) Provost McCall (virtual)
Councillor Parry (Council Leader) Councillor Cassidy (Deputy Council Leader)
Councillor Alexander  Councillor Curran
Councillor Imrie (virtual) Councillor McEwan
Councillor McKenzie Councillor McManus
Councillor Milligan Councillor Russell
Councillor Scott Councillor Smaill
Councillor Pottinger Councillor Virgo
Councillor Winchester 
Religious Representatives: 
In attendance: 
Dr Grace Vickers, Chief Executive  Kevin Anderson, Executive Director Place
Derek Oliver, Executive Director
Children, Young People and
Partnerships
Fiona Clandillon, Head of Development -
Capital and Entrepreneurial Projects 
Nick Clater, Head of Adult Services
& Chief Social Work Officer
David Gladwin, Chief Financial Officer and
Section 95 Officer 
Rebecca Hooton, Chief Officer
Children`s Services Partnerships
and Communities and Deputy Chief
Social Work Officer
Saty Kaur, Chief Officer Corporate
Solutions
Michelle Strong, Chief Education
Officer
Alan Turpie, Legal and Governance
Manager and Monitoring Officer
Peter Arnsdorf, Head of
Placemaking, Chief Planning Officer
Suzanne Ross, Principal Solicitor (virtual) 
Page 5 of 260

Page 6

Gerri Stanley, Trainee Solicitor Anna Herriman, Strategic Transport
Planning Manager
Nicola Thorburn, Democratic
Services Team Leader
Hannah Forbes, Democratic Services
Officer
Maria Perez, Democratic Services
Officer 
1. Welcome and Apologies 
The Legal and Governance Manager and Monitoring Officer advised that as Provost
McCall was attending today’s meeting virtually, they were unable to chair this meeting,
as per the Council’s hybrid meeting policy. 
The Legal and Governance Manager and Monitoring Officer asked the Elected
Members if they were comfortable that Standing Order 5, which states “The Provost
acts as the Civic Leader within Midlothian. S/He, or, if absent, the Depute Provost,
whom failing another Member of the Council chosen by the meeting, shall preside at
meetings of the Council” is suspended.  While Provost McCall is not absent and is
attending this meeting remotely, this will allow Deputy Provost Bowen to chair this
meeting.  The Legal and Governance Manager and Monitoring Officer asked for a
show of hands in favour of suspending Standing Order 5 and the 17 Elected Members
in attendance unanimously agreed. 
The Chair welcomed everyone to this meeting of Midlothian Council and advised that
the meeting will be broadcast live and saved to the Council’s archive. Items heard in
private will not be made available to the public. 
On behalf of the Council, the Chair congratulated Midlothian resident, Samantha
Gough, who has been awarded a Member of the Order of the British Empire (MBE) in
the King’s Birthday Honours List 2026 for services to sport and disability inclusion for
the visually impaired community. 
Apologies were received from Councillor Drummond and the Religious
Representative, Anne-Theresa Lawrie. 
2. Order of Business 
The Order of Business is as per the agenda. 
3. Declarations of Interest
Elected Members were invited to declare their financial or non-financial interest in
items of the agenda.
No declarations of interest were intimated at this stage of the proceedings. Elected
Members were reminded that they could make further declarations of interest at
relevant items of the agenda. 
Page 6 of 260

Page 7

4.    Deputations 
No items for discussion. 
5.    Minutes 
Report No. Report Title Presented by:
5.1 Minute of Midlothian Council Meeting of
12 May 2026 Executive Director Place 
The Minute of the meeting of Midlothian Council held on the 12 May 2026 was
submitted for approval. 
Councillor Parry moved to approve the Minute of the Meeting of Midlothian Council
of 12 May 2026, seconded by Councillor Cassidy. 
Councillor Milligan raised a matter arising from the previous Minute and highlighted
item 7.1 Health and Social Care, adding that during the debate on this item
Councillor Parry made a statement that they did not believe Health and Social Care
should be the burden of the Midlothian taxpayer.  Councillor Milligan advised that
they had been contacted by several people who have family members in receipt of
care and do not think that was the appropriate term to be used for people in the care
sector. Councillor Milligan asked Councillor Parry to clarify that they do not consider
people in social care to be a burden. 
Councillor Parry thanked Councillor Milligan for the opportunity to reiterate that it
was the cost burden that they were referring to, and not the people themselves. 
Councillor Parry acknowledged that the care given to people, and the work done by
those providing the services, is crucial.  Councillor Parry thanked all the front-line
staff currently working in very challenging circumstances. 
Decision
The Minute of the Midlothian Council Meeting of 12 May 2026 was approved as the
correct record. 
Report No. Report Title Presented by:
5.2 Minute Volume Index Executive Director Place 
The Minute Volume Index was submitted for approval. 
The Minute Volume Index was moved by Councillor Parry and seconded by
Councillor Cassidy. 
Decision
Council approved the Minute Volume Index. 
Page 7 of 260

Page 8

Report No. Report Title Presented by:
5.3 Action Log Executive Director Place 
Council agreed that items flagged as recommended for closure could be removed
from the Action Log.
Decision
Council agreed that items flagged as recommended for closure could be removed
from the Action Log. 
6. Questions to the Leader of the Council 
No items for discussion. 
7.  Motions 
Report No. Report Title Presented by:
7.1 Celebrating Midlothian Gala Days Councillor Parry 
Councillor Parry presented the motion as detailed below. 
Midlothian Council notes that Gala Days are a cherished tradition across Midlothian,
deeply rooted in the area's history and community spirit, and acknowledges that
these events are organised by dedicated local committees and volunteers, with
support from Midlothian Council staff in areas such as logistics, safety, infrastructure
and green spaces. 
Gala Days bring communities together, celebrate local identity, and create lasting
memories for residents of all ages. 
Midlothian Council recognises the tireless efforts of Gala Day organisers and
volunteers who give freely their time and energy to plan, coordinate, and deliver
these vibrant community events. 
Midlothian Council formally congratulate and thank all Gala Day organisers,
volunteers, Council staff, attendees and emergency services staff for their continued
commitment to making these events a highlight of Midlothian's calendar. 
Councillor Parry emphasised their thanks to the volunteers, young people, schools,
Council staff and blue light services for their dedication and hard work.   
The Provost added that they were pleased to second this motion, and whole
heartedly agreed on the sentiments of Councillor Parry. 
Councillor Russell thanked Councillor Parry for highlighting the other gala days,
festivals and fun days that take place in Midlothian and acknowledged the hard work
of those involved. 
Page 8 of 260

Page 9

The motion was moved by Councillor Parry and seconded by Councillor McCall.
Decision
Council approved the motion. 
Report No. Report Title Presented by:
7.2 Volunteers’ Week 2026 Councillor McCall 
As Volunteer Champion, the Provost presented the motion as detailed below. 
Council recognises Volunteers' Week, which ran from 1 to 7 June 2026, with the
theme of "Ignite Volunteerism"; notes that Midlothian Community Action hosted the
annual Volunteer Awards at Newbattle Abbey College on Thursday 4 June 2026,
with eight different awards being presented on the night; welcomes the breadth and
depth of volunteering opportunities within Midlothian; recognises the hard work by
Midlothian Community Action (MCA) to host the event and promoting volunteer
opportunities; thanks the sponsors without whom the event could not take place;
congratulates all the winners and nominees and thanks them for their commitment
and dedication. 
The Provost highlighted that there are approximately 33,000 volunteers that are
known to us in Midlothian, which is around one third of our residents volunteering,
which is the highest number in Scotland.  The Provost thanked MCA who organised
the amazing Volunteer of the Year Awards which they helped to host, this was a
wonderful opportunity to celebrate our volunteers and the contribution that they
make to Midlothian and beyond. The Provost finished with the words that they shared
at the Volunteer of the Year Awards; Volunteering continues to be a powerful force
for good.  It connects people, nurtures wellbeing, strengthens communities, ignites
activism and empowers communities.  It gives individuals a sense of purpose.  Here
in Midlothian volunteers create safe green spaces, support families, care for the
environment, care for carers and for each other.  Volunteers show up when they are
needed most and in dignity lift people from struggles, mental health difficulties,
loneliness or poverty. 
Councillor McKenzie added that it was lovely to attend the Volunteer of the Year
Awards, which was a fantastic evening where they saw people from ages 8-80
winning awards.  Councillor McKenzie said that in a world that is often full of
negativity it was very humbling to see what these volunteers do on the front line. 
The motion was moved by Councillor McCall and seconded by Councillor McKenzie. 
Decision
Council approved the motion. 
Page 9 of 260

Page 10

8.  Public Reports 
Report No. Report Title Presented by:
8.1 Financial Monitoring 2025/26 -
General Fund Revenue
Chief Financial Officer and
Section 95 Officer 
The Chief Financial Officer and Section 95 Officer presented the report for decision. 
The purpose of this report is to provide Council with information on performance
against service revenue budgets in 2025/26 and to provide commentary on areas of
material variance against budget. The budget performance figures as shown in
appendix 1 result in a net overspend of £1.083 million which represents 0.3% of the
revised budget. 
Some areas of projected overspend relate to recurring areas of financial pressure or
slower than planned delivery of savings measures. The Corporate Management
Team have discussed these in depth and, where possible, put in place recovery
actions. 
Midlothian Integration Joint Board (MIJB) spend on Adult Social Care exceeded
budget by £2.827 million. 
The General Fund balance at 31st March 2026 is £24.418 million, of which £17.777
million is earmarked for specific use leaving a non-earmarked General Fund balance
of £6.641 million. 
Council is recommended to: 
a) Approve a supplementary estimate of £2.827 million to increase the budget
for Midlothian Integration Joint Board to £74.575 million (section4). 
b) Approve the application in 2025/26 of £1.759 million of Developer
Contributions to fund unitary charge costs for Newbattle Community High
School (section 3.4). And otherwise 
c) Note the contents of this report. 
The Chair thanked the Chief Financial Officer and Section 95 Officer for their report
and invited questions. 
Councillor Parry thanked the Chief Financial Officer and Section 95 Officer for the
paper, noting that it is also helpful to draw out some of the positives within the report
and the continued areas of success, particularly in relation to the increase in leisure
memberships. 
Councillor Parry acknowledged the overspend in terms of the Looked After Children
and was reassured that this is on the agenda for discussion in today’s meeting. 
Councillor Parry added that the Health and Social Care year-end position is slightly
better than expected but the additional £2.827 million to increase the budget for the
MIJB is still significant for the Council, and we must work closely with MIJB
Page 10 of 260

Page 11

colleagues to discuss the challenges and ensure they can continue to deliver a
sustained service. 
Councillor Imrie referred to section 3.2 of the report regarding the Chief Executive
having a directive to all the Directorates for budget recovery plans which was
introduced in 2024/25, carried on to 2025/26 and now into 2026/27.  Councillor Imrie
highlighted that Directorates used to be responsible for their own budgets and these
were not supplemented across any other Directorates. 
Councillor Imrie highlighted the staff costs for maternity cover and how these costs
are partially offset by vacancies across the Council, which is not managing the
budget within Education.  If there is extra expenditure in Education, then that spend
should be contained in Education. 
Councillor Imrie highlighted Waste Disposal and asked for more information on the
problems described in the paper.  Councillor Imire noted that when the waste plan
was first envisaged, with the City of Edinburgh Council (CEC) being a partner with
Midlothian, there was capacity for other local authorities or private waste collectors
coming in and Midlothian would receive a gate price which would offset some of the
expenditure. 
Councillor Imrie accepts the use of Developer Contributions to fund unitary charge
costs for Newbattle Community High School due to the increase in pupil capacity but
asked the Chief Financial Officer and Section 95 Officer what the implications are
for the following years and whether this is a one-off payment. 
The Chief Financial Officer and Section 95 Officer advised that the information in
section 3.2 is a recognition by the Chief Executive and all senior staff of the severity
of the financial pressure Council faces and that all Council staff and Elected
Members have a collective responsibility to adhere to business critical spend only. 
In terms of managing budgets within services, the Chief Financial Officer and
Section 95 Officer advised that budgets are managed separately internally at Officer
level, and these, and any recovery actions, are reviewed regularly.  The information
being presented to Council is a strategic level summary, but a more detailed
breakdown can be provided if required. 
The Chief Financial Officer and Section 95 Officer advised that the Developers
Contributions relating to the increased pupil capacity for Newbattle Community High
School are a one-off payment for 2025/26. 
For Waste Disposal, the Executive Director Place advised that there was an
expectation that the Council would get third party income, and while this is being
received it has not been to the extent that was forecast.  This has been raised with
Finance, across the Place Directorate and the City of Edinburgh Council (CEC). 
There has been an increase in terms of volume coming from CEC into the plant,
which reduces the capacity to allow others in and generate the third-party income. 
The Executive Director Place is engaged with their counterparts in the CEC and has
a meeting next week to address the disparity and a Value for Money report. 
Councillor Imrie thanked the Chief Financial Officer and Section 95 Officer for
providing clarification on the points they raised.  
Page 11 of 260

Page 12

Councillor Imrie thanked the Executive Director Place for their response in relation
to Waste Disposal and added that they understood that the agreement with CEC
was in terms of tonnage.  If this is being exceeded then there is an unfairness
regarding the amount of money we can take in and if some of the capacity is taken
up by CEC then this has an impact on Midlothian Council, and the income stream
we hoped to receive. Councillor Imrie requested that additional information is
brought back to the Chamber as Council may need to take a position on this as it
has not been budgeted for and may have a financial impact in coming years. 
Councillor Smaill added that the Council must balance its budget every February
and now, only 4 months later, we have an additional £2.8 million going to the MIJB. 
Councillor Smaill asked if Audit Scotland are comfortable that Midlothian Council
knew in February 2026 that a significant number was coming in relation to the MIJB
but that this is only being recognised now and are we in danger of appearing to
balance the budget and then having major adverse variances we were aware of. 
The Chief Financial Officer and Section 95 Officer advised that it would not be
appropriate for them to comment on behalf of Audit Scotland but added that Audit
Scotland publish commentary on IJB performance, highlighting challenges and the
demand for services across Scotland and this is shared with Audit Committee on a
routine basis.  In terms of the specifics of the MIJB, the Council is governed by the
Integration Scheme which is clear on how any overspend is dealt with and this is the
appropriate time to provide a supplementary estimate, as recommended in the
paper.  Looking back to earlier monitoring reports, the projected overspend has been
discussed throughout the year and alongside that there has been significant work
taken by our Health and Social Care colleagues to manage the overspend and
attract additional funding. 
Councillor Milligan acknowledged the positives in the report and that the impact of
the investment in leisure services is apparent.  Councillor Milligan also highlighted
that when Council agreed to finance the Alpine Coaster in previous years there was
criticism from members of the public and some Councillors, however we are now
seeing the income going back into the Council to support other services. 
Councillor Milligan queried the underspend in Road Services, adding that they would
have expected this to have been used.  Councillor Milligan has raised a safety issue
regarding the degradation of the white lines at give way and stop junctions, and
particularly at the Eskbank and Cockpen roundabouts, that all require updating. 
Councillor Milligan was advised that the remaining budget was for disabled bay
marking and removal and asked whether this money could be used to update the
white lines. 
Councillor Milligan highlighted the shortfall in Commercial Properties and asked if
we have downsized the team internally to help offset the costs of using external
commercial agents for this work and whether any savings have been identified as a
result. 
In terms of moving budgets between services, the Chief Financial Officer and
Section 95 Officer advised that we have financial regulations and financial directives
below that which provide guidance on how we can do that, so it is possible. 
Page 12 of 260

Page 13

The Executive Director Place noted there were dedicated operatives for lines and
signs but that has been reduced since the 2018 budget saving proposal which was
accepted.  However, this is incorporated within the overall budget, and the white
lining and signing is done on an ad-hoc basis rather than a set programme of works. 
The Executive Director Place added that this year through Roads Services there
have been other funding sources that have assisted the budget, and while there is a
revenue underspend we have benefited from capitalisation from Transport Scotland
on the A703, the A7, the Tour de France profile for next year and the work ongoing
in the area around the Sun Inn, Dalkeith. The Executive Director Place agreed to
take away the prospect of repurposing that Roads Services underspend for white
lines for consideration. 
The Executive Director Place advised that there are currently 7 vacancies in the
Roads Services Team, which have been difficult to fill as recruitment has internal
competition with Waste Services.  There are also 3 vacancies in the Commercial
Lets Team which are funding the external agency provision and updates are being
provided to the Income Generation Cross Party Working Group (IGCPWG). 
Councillor Pottinger highlighted that the financial position on Adult Health and Social
Care has worsened and asked if there are other options to manage the deficit that
Council should be considering given that the previous motion to use reserves was
unsuccessful. 
The Chief Financial Officer and Section 95 Officer advised that the MIJB budget for
2026/27 was approved in February 2026 and the MIJB accepted this and have
financial recovery planning actions in place. The Chief Financial Officer and Section
95 Officer has assurance from the Chief Officers of the MIJB that the financial
recovery plan for 2026/27 is progressing well and currently has no cause to revert
to Council.  In September 2026, when the Quarter 1 finances are available, this can
be revisited.  In the meantime, discussions with the National Health Service (NHS)
and the Scottish Government will continue. 
Councillor Pottinger asked whether this requires a national resolution if other IJBs
are in similar positions and the Chief Financial Officer and Section 95 Officer agreed
that it does and referred to the Audit Scotland publication mentioned earlier in the
meeting which details the challenges across Scotland. 
The report was moved by Councillor Parry and seconded by Councillor McManus. 
Decision
Council approved the report and its recommendations. 
Action
Waste Disposal - Provide further information on the usage and available capacity
to Council following the meeting with the City of Edinburgh Council to address
disparity and a Value for Money report - Executive Director Place. 
Review the Roads Services underspend and consider whether this can be
repurposed to update degraded while lines at junctions - Executive Director Place. 
Page 13 of 260

Page 14

Report No. Report Title Presented by:
8.2 
Housing Revenue Account:
Revenue and Capital Final Outturn
2025/26 and Capital Plan 2026/27
- 2028/29
Chief Financial Officer and
Section 95 Officer 
The Chief Financial Officer and Section 95 Officer presented the report for
information. 
The purpose of this report is to provide Council with:- 
• The final outturn position for 2025/26 for both the Housing Revenue Account
(HRA) and Capital Plan supported by the HRA; 
• A revised capital plan for 2026/27 to 2028/29 reflecting the cross-year budget
movements and the latest capital plan delivery programmes. 
The summarised financial performance for 2025/26 is: 
• Capital Investment in the year totalling £47.099 million; 
• A net overspend of £1.729 million on the Revenue Account; 
• An HRA reserve at 31st March 2026 of £30.242 million, the majority of which
is committed to finance investment in the new build programme. 
Council is recommended to note the contents of this report. 
The Chair thanked the Chief Financial Officer and Section 95 Officer for their report
and invited questions. 
Councillor McKenzie thanked the Chief Financial Officer and Section 95 Officer and
their team for the diligent work they do and added that there have been another 70
houses added to the Council’s stock which means 70 families now have more
certainty and stability. 
Councillor Smaill requested more detail on the steep increase in responsive
maintenance as detailed on page 62 of the meeting papers.  The Executive Director
Place advised that there has been an uptick and that is reflective of the work that is
ongoing in relation to dampness across the housing stock and includes the removal
and return of families to their homes.  The average cost has been approximately
£18,000 - £20,000, and in some instances £40,000 depending on the extent of the
work.  There have been some delays, which Elected Members will have had some
correspondence on with their Constituents, and this is due to the availability of the
contractors who specialise in that field as other local authorities are completing
similar programmes of work at the same time. 
Councillor Smaill also requested detail on what percentage of the Scottish
Government Housing Support Funds Midlothian receives.  The Chief Financial
Officer and Section 95 Officer advised that they did not have this information to hand
but would take an action to provide this detail.
Page 14 of 260

Page 15

Councillor Curran queried whether the number of Housing Officers has increased
proportionally with the housing stock as the resource challenges in this area had
been discussed at Council previously.  The Executive Director Place advised that
there are several vacancies that are being covered by agency staff and that they are
in the final stages of completing the Managing Change Policy.  This policy aligns to
Building Maintenance Services (BMS) and Housing Services, and they expect that
more information will be brought to September 2026 Council to give Elected
Members visibility. 
Decision
Council noted the report and its recommendations. 
Action
Confirm the percentage of the Scottish Government Housing Support Funds that
Midlothian receives - Chief Financial Officer and Section 95 Officer. 
Report No. Report Title Presented by:
8.3  General Services Capital Plan
2025/26 Final Outturn
Chief Financial Officer and
Section 95 Officer 
The Chief Financial Officer and Section 95 Officer presented the report for decision. 
The purpose of this report is to provide Council with:- 
• An update of the GSCP incorporating information on further additions to the
Capital Plan for approval (Section 3) 
• Information on the final outturn performance against budget for 2025/26
(Section 4.1-4.5); 
• An update on the capital fund balance at 31 March 2026 (Section 5). 
It is recommended that the Council:- 
1. Note the inclusion of the projects listed in Section 3.1 in the General Services
Capital Plan (GSCP) 
2. Approve the addition of the new projects to the GSCP, as outlined in Section
3.2 and the adjustment to project budgets, as outlined in Section 3.3; 
3. Note the General Services Capital Plan outturn position for 2025/26 as set
out in Section 4. 
The Chair thanked the Chief Financial Officer and Section 95 Officer for their report
and invited questions. 
Councillor Parry highlighted some of the projects within this report, firstly noting that
the progress on improvements to Mauricewood Primary School is welcomed. 
Councillor Parry also mentioned Birkenside Pavillion and Pathhead Pavillion, noting
Page 15 of 260

Page 16

the difference these projects have made to the community facilities is excellent and
encouraged other Elected Members to visit and witness the transformations. 
The report was moved by Councillor Parry and seconded by Councillor Scott. 
Decision
Council approved the report and its recommendations. 
Report No. Report Title Presented by:
8.4 Annual Treasury Management
Report 2025/26
Chief Financial Officer and
Section 95 Officer 
The Chief Financial Officer and Section 95 Officer presented the report for
information which informs members of the Council of the Treasury Management
activity undertaken in 2025/26 and the year-end position. 
This report was considered in detail at Audit Committee on 22 June 2026 and is
presented to Council today unchanged. 
It is recommended that Council note the Annual Treasury Management Report
2025/26. 
The Chair thanked the Chief Financial Officer and Section 95 Officer for their report
and invited questions. 
Councillor Parry noted that this report had been presented to Audit Committee on
22 June 2026 where the Audit Committee had an opportunity to thank the Chief
Financial Officer and Section 95 Officer and their team for the outstanding work they
do on our Treasury Management Strategy every year, as this does benefit us
significantly over the years. 
Councillor McEwan, as Chair of Audit Committee, reiterated their thanks to the Chief
Financial Officer and Section 95 Officer and their team for continuing to look after
the wellbeing of this Council. 
Decision
Council noted the report and its recommendations. 
Report No. Report Title Presented by:
8.5 Medium Term Financial Strategy
2027/28 to 2028/29
Chief Financial Officer and
Section 95 Officer 
The Chief Financial Officer and Section 95 Officer presented the report for
information. 
Page 16 of 260

Page 17

The report sets out the outcome of a review of the Council’s financial planning
assumptions which now point to a projected budget gap of £6.176 million in 2027/28
rising to £14.895 million by 2028/29. 
Pressure on budgets across the public sector is severe and as the fastest growing
Local Authority in Scotland the impact is intensified in Midlothian. Population
projections show a continued high level of growth in Midlothian through to 2043. 
There is a significant underlying funding gap before Council tax increases and
planned utilisation of reserves of £15.261 million (4.2% of net expenditure) in
2027/28 rising to £25.859 million by 2028/29 (4.1% of net expenditure) that will
impact on what services the Council can continue to deliver and how they are
delivered. Reprioritisation and redesign are crucial to balancing the MTFS and swift
action is needed. 
Council is recommended to: - 
a) Note that the Business Transformation Steering Group (BTSG) will continue
to consider measures necessary to support delivery of a balanced Medium
Term Financial Strategy (MTFS) before any policy measures are presented
to Council. 
b) Note the recommendation from the best value audit report on transformation
that the Council recognises that it is operating in a fiscally challenging
environment and now needs to find a way to accelerate progress on the
remaining projects within the Transformation Blueprint with the resources it
has available and also further Accounts Commission commentary on
delivering transformational change (sections 5.2 and 5.3). 
c) Note the MTFS planning assumptions set out in the report (sections 4.1to
4.3). 
d) Note that the budget gap for 2027/28, incorporating the planned use of
service concession retrospection and an indicative 8% annual Council Tax
increase is projected to be £6.176 million, rising to a projected £14.895 million
by 2028/29 (section 4.1). 
e) Note the urgent need to address the gap between recurring expenditure and
recurring income (section 5). 
f) Note the position relating to Midlothian Integration Joint Board (section 6) and 
g) Otherwise note the remainder of the report. 
The Chair thanked the Chief Financial Officer and Section 95 Officer for their report
and invited questions. 
Councillor Pottinger mentioned a recent announcement from the Scottish
Government regarding their large underspend and asked if Midlothian Council had
made any direct appeals to them to assist us with our budgets. 
Page 17 of 260

Page 18

The Chief Financial Officer and Section 95 Officer advised that they did not have the
detail of this particular announcement, however confirmed that they are not aware
of additional funding flowing to Midlothian as a consequence of any underspend. 
Councillor Smaill highlighted a point, that was also raised at Audit Committee, about
the potential of the Council having to borrow up to £900 million which is much higher
than any historic debt burden and shared concerns about 2029/30 and 2030/31 as
some major capital spends will involve high levels of borrowing.  The numbers
presented to Audit Committee on 22 June 2026 show that 50-year money now costs
6% and so the cost of servicing debt will transform the position from difficult in
2028/29 to almost impossible in subsequent years.  Councillor Smaill asked when
work will begin to look at those years further ahead. 
The Chief Financial Officer and Section 95 Officer clarified that the £1 billion referred
to at Audit Committee is split between the General Fund and the Housing Revenue
Account.  Projections show that the costs will come down and may give us the
opportunity to borrow at a lower rate, but that is not guaranteed so the Chief Financial
Officer and Section 95 Officer and their team monitor this closely.  For 2029/30 and
beyond, the Chief Financial Officer and Section 95 Officer intends to present a 5-
year plan to the new Council in 2027.  There is a plan for 2029/30 which the Chief
Financial Officer and Section 95 Officer can share but the further we go out in dates
the more assumptions and risks are included. 
Councillor Scott mentioned the reference to one-stop-shop services in Gorebridge
and Dalkeith and that these plans will be presented to the Business Transformation
Steering Group (BTSG) on 5 October 2026.  The building in Gorebridge has several
leaks which are currently being caught by buckets and asked if this could be
discussed earlier than October. 
The Chief Officer Corporate Solutions apologised and confirmed that there is not a
report going to BTSG on 5 October 2026.  They are waiting on an external funding
bid to hopefully be agreed over the summer, which is why the work has not started. 
This would offset some of the money that Council has approved.  The Chief Officer
Corporate Solutions appreciated the urgency and advised that they aim to kick off
these projects immediately after the summer holiday programmes is complete. 
Decision
Council noted the report and its recommendations. 
Action
Share the 2029/30 Medium Term Financial Strategy with Elected Members for
information - Chief Financial Officer and Section 95 Officer. 
The Chair advised Council that both agenda items 8.6 and 8.7 had the potential for
the discussions to stray into the private remit and asked the Legal and Governance
Manager and Monitoring Officer to flag any such risks during discussion and that
Elected Members were mindful of this. 
Page 18 of 260

Page 19

Report No. Report Title Presented by:
8.6 Best Value Audit - Asset
Management
Chief Financial Officer and
Section 95 Officer 
The Chief Financial Officer and Section 95 Officer presented the report for
information and advised that on an annual basis and in support of the rolling
programme of Best Value Audits for individual Councils.  The area of work most
recently carried out was in relation to Asset Management and the Audit Scotland
report was presented to and discussed and Audit Committee on 22 June 2026. 
The key findings are that, overall, the report is positive and Midlothian Council has
strong arrangements in place in a number of areas including governance,
affordability and partnership working, but that some opportunities do exist to
strengthen asset management arrangements on top of the solid building blocks that
are already in place. 
The report recommends that Council develop a strategic overarching asset
management strategy which will reduce the risk of fragmented decision-making
whist recognising significant progress in various areas of work and that
improvements could be made in performance reporting. 
The Chair thanked the Chief Financial Officer and Section 95 Officer for their report
and invited questions. No questions were submitted. 
Decision
Council noted the report. 
Report No. Report Title Presented by:
8.7
Delivering for the Future.
Transformation: How councils are
redesigning and delivering more
efficient services
Chief Financial Officer and
Section 95 Officer 
The Chief Financial Officer and Section 95 Officer presented the report for
information which provides Council with a summary of the Delivering for the future,
Transformation: How councils are redesigning and delivering more efficient services
report which was published by Audit Scotland in May 2026 and is appended to this
report. 
Five key messages come from the report covering the need for councils to drive
forwards sustainable transformational change, have clear objectives and outcomes
from transformation programmes, develop cross-sector working, promote
community consultation and have a consistent approach to Equality Impact
Assessments. 
This report was also presented at Audit Committee on 22 June 2026. 
Council is recommended to: 
Page 19 of 260

Page 20

• Consider the Audit Scotland report; 
• Note that the report draws on the findings of the Transformation Best Value
Reviews of twenty-two Councils during 2024/25; and 
• Note that the key messages continue to be considered by Council Officers
and embedded in the Medium-Term Financial Strategy (MTFS) Report to be
considered by Council on Tuesday 23rd June 2026. 
The Chair thanked the Chief Financial Officer and Section 95 Officer for their report
and invited questions. 
Councillor Pottinger referenced page 136 of the meeting papers where it mentioned
that not all Councils were using Equality Impact Assessments and asked if this is
just an observation or if it means we will not have these in the future, as they
understood this was a statutory requirement. 
The Chief Financial Officer and Section 95 Officer advised that this is an Audit
Scotland publication and the findings in the report cover most local authorities in
Scotland.  For Midlothian, the Equality Impact Assessments are embedded in our
processes, and we are in a strong position. 
Councillor Virgo clarified that the report says that not all Councils are using Equality
Impact Assessments effectively or consistently, not that they are not used at all. 
Councillor McEwan highlighted that this is an Audit Scotland report and that it alludes
to Midlothian Council’s good practice under four case studies. 
Decision
Council noted the report and its recommendations. 
Report No. Report Title Presented by:
8.8 Best Value Self-Evaluation Chief Executive 
The Chief Executive presented the report for information which provides Council with
a completed self-evaluation of the Council’s adherence to the Best Value framework
which reflects the changes introduced to the approach to auditing Best Value in
Scottish councils by Audit Scotland in 2023. 
Council is asked to consider the Best Value Self-evaluation report (Appendix B)
which reflects the recent review of the Best Value Framework in the context of the
Best Value Report due to be prepared and considered by Audit Scotland in 2026/27. 
The Chair thanked the Chief Executive for their report and invited questions. 
Councillor Parry acknowledged the level of detail contained in this report and noted
that it shows how fantastic our workforce is, including Officers and the Senior
Management Team.  This is a well put together summary of what the Council does
and encouraged others to read it. 
Page 20 of 260

Page 21

Councillor Smaill highlighted that 15 years ago the Best Value report from Audit
Scotland said that Elected Members did not challenge Council Officers enough and
noted that this is certainly not the case now. 
Decision
Council noted the report and its recommendations. 
Report No. Report Title Presented by:
8.9
Midlothian Community Planning
Annual Reporting for H2
2025/2026
Chief Executive 
The Chief Executive presented the report which provides Midlothian Council with an
update on the progress the Community Planning Partnership in Midlothian has made
during 2025/2026, detailing progress on the outcomes and targets as set out in the
four-year Single Midlothian Plan. 
The Community Planning Board receive 6 monthly detailed reports for scrutiny,
challenge, celebrating success and feedback. In addition, the full Midlothian
Community Planning Partnership has undertaken a robust scrutiny of progress
during 2025/2026 at both operational and strategic thematic level, culminating at the
Community Planning Board Scrutiny meeting held on 4th June 2026 where they
analysed the latest 6-month monitoring and tracking report (Appendix B). 
Council is asked to: 
• Note the achievements set out in the Midlothian Community Planning
Partnership Monitoring Report for H2 2025/2026. 
• Acknowledge and celebrate the strong partnership ethos, leadership, and
commitment demonstrated by public and third sector partners, who have
worked collaboratively with local communities to improve outcomes across
Midlothian. 
• Note plans to produce a public facing accessible annual report summarising
the achievements of the Single Midlothian Plan 2025/26. 
As Head of Paid Service, the Chief Executive was thrilled to sit through the
Community Planning Board meeting and hear the progress on each of the themes. 
The Chair thanked the Chief Executive for their report and invited questions. No
questions were submitted. 
Decision
Council noted the report and its recommendations. 
Page 21 of 260

Page 22

Report No. Report Title Presented by:
8.10 Midlothian’s Local Transport
Strategy (LTS) 2026-2035 Executive Director Place 
The Executive Director Place presented the report for decision which presents
Midlothian’s draft LTS 2026-2035 (Appendix C), and LTS Executive Summary
(Appendix B) for adoption. Once adopted the LTS policies will provide the required
policy framework for decisions and investment relating to transport in and affecting
Midlothian. The LTS seeks to support the policies of Midlothian’s Local Development
Plan (MLPD2), also presented separately on the Council agenda at this meeting. 
Council is recommended to: 
1.1  Adopt the Local Transport Strategy (LTS) and also the summary versions
(Appendices B & C respectively), which have been prepared to provide a policy
framework to guide transport decisions and prioritise investment over the ten-
year period to 2035, and 
1.2 Agree to the development of a Prospectus for Midlothian Strategic Transport
Projects, to be reported back to Council after the Summer recess 2027, which,
as set out in section 3.will incorporate identified transport interventions from the
Midlothian Local Development Plan 2 Transport Appraisal, and priority and
committed transport schemes for delivery in the next decade. 
1.3 Note the requirement to publish the Strategic Environmental Assessment (SEA)
at Appendix E, and Integrated Impact Assessment (IIA) at Appendix F on the
Council’s website. 
The Chair thanked the Executive Director Place for their report and invited questions. 
Councillor Cassidy welcomed the paper and acknowledged the amount of work that
has been put into Midlothian’s Local Transport Strategy 2026-2035.  This is a matter
close to all our hearts in Midlothian, and we are aware of the problems encountered
when trying to commute to Edinburgh. Councillor Cassidy added that they have had
assurance that more carriages will be available for the Borders Railway when the
new carriages are replaced in England. 
On behalf of the Labour Group, Councillor Imrie suggested that we look at the LTS
differently.  As Councillor Cassidy said, we all want a safer, cleaner and more
accessible transport options and if we are serious about making a shift in Midlothian,
then we need to consider what works for the people who live here.  The data confirms
that most residents who do not drive to work rely on public transport, not walking or
cycling.  Across Scotland public transport accounts for the bulk of the non-car
commute, cyclists account for approximately 2-3% and walking is higher.  In semi-
rural authorities like Midlothian, with long commuting distances, state gradients and
dispersed settlements, walking and cycling cannot absorb the model shift this
strategy aspires to.  While walking and cycling are important they are not substitutes
for the daily commute for most people in this area.  The Labour Group is suggesting
that the LTS is unbalanced and there is too much emphasis on active travel such as
walking and cycling and not enough emphasis on bus or rail.  Council must recognise
that public transport is most used by lower income households, young people, older
Page 22 of 260

Page 23

residents and by those that cannot afford to run a car.  The Labour Group is not
against the LTS, but it must reflect the geography of Midlothian, those that live here
and be based on how people travel.  The balance in the LTS is not correct, and the
Labour Group is asking for simple, constructive change so the primary focus is on
public transport with walking and cycling as supporting elements. 
Councillor Alexander endorsed the need for more public transport but to say active
travel should be secondary is not solving the problem as we need both as they
complement each other.  Active travel is becoming more popular and if we do not
support this, we will not see the enjoyment and benefits.   
Councillor Parry thanked the Strategic Transport Planning Manager for their
outstanding work to bring in a lot of funding which has been used for active travel. 
Councillor Parry noted her agreement with all the points made by Councillor Cassidy
and Councillor Imrie, adding that our constituents often email the Elected Members
about public transport.  Councillor Parry added that Council must give Councillor
Cassidy and Councillor Imrie the best possible mandate when they attend national
meetings and therefore was comfortable to move forward as suggested. 
Councillor Smaill highlighted policy 28, which is detailed on page 492 of the meeting
papers, regarding the LTS supporting the extension of the Borders Railway to
Carlise and added that this report is not going to come forward for another year and
so it would be premature for this Council to support a project for which we do not
have a full specification. If policy 28 is to be kept it should be on the understanding
that a final decision will be made when the evidence has been seen. 
Councillor Milligan noted that Councillor Parry had already agreed with the points
made by Councillor Imrie on behalf of the Labour Group.  Councillor Milligan added
that, in a semi-rural community like Midlothian, the percentage of people relying on
buses or rail is high and we need to send out a clear message that public transport
is a priority. Councillor Milligan acknowledged the work done by the Strategic
Transport Planning Manager and the money they have brought in which has led to
many improvements. 
The Legal and Governance Manager and Monitoring Officer asked for clarification
on what had been agreed and whether this paper is moved as it is or with the
amendment suggested by the Labour Group. 
Councillor Parry moved recommendation 1.1 subject to an amendment to ensure
that the Local Transport Strategy (LTS) reflects a balance between bus, rail and
active travel.  Recommendations 1.2 and 1.3 remain unchanged.  Seconded by
Councillor Milligan. 
Decision
Council approved the report and its amended recommendations. 
The Deputy Provost called a short recess at 12.30pm. 
The meeting resumed at 12.45pm 
Page 23 of 260

Page 24

Report No. Report Title Presented by:
8.11
Midlothian Local Development Plan
2 (MLDP2) Proposed Plan –
Approval for Consultation
Head of Placemaking and
Chief Planning Officer 
The Head of Placemaking and Chief Planning Officer presented the report for
decision. This report seeks approval of the Midlothian Local Development Phase 2
(MLDP2) proposed plan and associated documents for consultation and
summarises the main findings of the supporting environmental and transport
assessments. 
The Head of Placemaking and Chief Planning Officer noted that every Local
Authority is required by legislation to prepare a local development plan every 10
years. The Midlothian Local Development Plan (MLDP) was adopted in November
2017. Following the Scottish Government publishing planning policy National
Planning Framework 4 (NPF4) Local Authorities reviewed their plans with a view to
adopting a new or replacement plan. Midlothian Council has engaged with key
agencies, communities, developers, landowners and Elected Members, and
collected evidence on what the proposed MLDP2 should be based. The Council has
validated the Local Place Plans which have set up community priorities for each
area. To meet its housing targets, Midlothian Council also set an indicative Local
Housing Land Requirement (LHLR) and progressed through a site selection
progress which was approved at the Planning Committee Meeting of 18 November
2025. 
The Head of Placemaking and Chief Planning Officer advised the purpose of the
MLDP2 is to set out the development strategy for Midlothian, identify sites for
development and set out policies against which development proposals are
assessed. Decisions on planning applications are to be made in accordance with
MLDP2. The plan seeks to provide new homes needed to meet demand and support
economic growth whilst protecting environmental and historic assets.  The plan also
aims to support the creation of sustainable, inclusive and accessible places across
Midlothian. The main changes from the MLDP 2017 plan are that MLDP2 seeks to
allocate land for development, enhance the importance of green infrastructure and
support climate change mitigation. In terms of housing, the plan requires the
provision of a range of properties, including homes for first-time buyers, those with
bespoke needs and an affordable housing requirement. The plan seeks to broaden
the range of matters which Developer Contributions can be secured for and increase
the flexibility for employment sites in terms of uses. The plan also responds to issues
raised by Elected Members in MLDP2 workshops, Planning Committee and Local
Review Body meetings. 
Council is recommended to: - 
a) Approve for consultation the publication of the Midlothian Local Development
Plan 2 (MLDP2) Proposed Plan, the Proposed Delivery Programme, the draft
Environmental Report and the draft Habitats Regulations Appraisal. 
b) Instruct the Council’s Head of Placemaking to instigate a MLDP2 12-week
public consultation. 
Page 24 of 260

Page 25

c) Confirm the Local Housing Land Requirement to be included in the MLDP2
Proposed Plan at 8,851 residential units. 
d) Note the content of and agree to the publication of the MLDP2 Housing
Technical Note as supporting information to the 12-week public consultation. 
e) Note the content of the MLDP2 High Level Financial Statement, MLDP2
Transport Appraisal and the Summary of MLDP2 Response to Local Place
Plans. 
f) Agree to the Head of Placemaking and Chief Planning Officer undertaking
minor editorial amendments to the documents as required prior to publication. 
If Council agrees to these recommendations the final modified plan, following the
consultation, will be submitted to the Scottish Government for examination and
hopefully for adoption thereafter. 
The Chair thanked the Head of Placemaking and Chief Planning Officer for their
report and invited questions. 
Councillor Scott thanked all Officers involved in the development of the MLDP2
reports and moved to approve the recommendations in the report subject to a minor
amendment to the following sections of the MLDP 2 Proposed Plan: 
• Gorebridge Place Statement - Local Priorities and Aspirations.  Paragraph
239 should be amended by adding the following additional bullet point
“Identifying a site for a new high school in Gorebridge, which could also
accommodate a sports complex (swimming pool, all weather pitches, gym
etc) and health centre on the site”. 
• MLDP2 Draft Delivery Programme - Table 3 Education.  Table 3 should be
amended by changing reference to Newbattle High School in the “School”
column, to “Newbattle High School or other non-denominational secondary
school provision within existing catchment area” 
Councillor McKenzie seconded Councillor Scott’s motion to approve the report
subject to the amendments listed above.   
Councillor Scott also suggested that the Community Profile in the MLDP2 report may
be converted into a Guide to Midlothian and noted that including school transport
among matters to be considered for Developer Contribution negotiations will
alleviate costs for the Council. Councillor Scott also noted that wheelchair accessible
bungalows in new estates will be attractive for aging or disabled residents looking to
downsize and suggested introducing a register of residents who may benefit from
these properties. Councillor Scott welcomed the plans to report financial
contributions for each infrastructure plan to the Planning Committee on an annual
basis and regularly review Developer Contributions but wondered whether there are
sufficient officers to deliver this. 
Page 25 of 260

Page 26

The Head of Placemaking and Chief Planning Officer clarified that if Council decides
to accept the proposed amendment moved by Councillor Scott, the amendments will
be included in the document submitted for consultation. The Head of Placemaking
and Chief Planning Officer confirmed the proposed plan looks to give the Council
additional scope to spend Developer Contributions in a range of matters, including
travel to school, but warned that there is still a legal and regulatory framework that
dictates the time periods where these Developer Contributions need to be used and
how they need to be applied to mitigate the aspects from a particular development
rather than be put in a general pot. 
Councillor Alexander voiced her support for the MLDP2 report proceeding to
consultation, noting that as the largest settlement in Midlothian, Bonnyrigg’s growth
should be matched by an infrastructure that meets the need of the community.
Councillor Alexander praised the report appendices on mitigating climate change as
a step towards the Council achieving net zero. 
Further discussion ensued concerning the policies of allocating land for the
accommodation of Gypsy and Traveller population in MLDP2. Councillor Scott
queried whether this could be investigated with a view to piloting as there is a
Traveller encampment on Dalkeith Campus at present. The Head of Placemaking
and Chief Planning Officer clarified Scottish Government legislation requires the
Council to have a policy with criteria to evaluate for future applications, however it is
not required to identify a designated site. 
Councillor Curran noted the unauthorised Traveller camp at Dalkeith Campus is
causing damage to the playing fields as well as causing disruption when the school
was evacuated due to a false alarm as the usual muster points could not be used.
The encampment is also preventing the local community from using the playing
fields. Councillor Curran acknowledged the Traveller community’s right to practice
their preferred lifestyle however this needs to be balanced against the needs of the
wider community. Councillor Curran advised they wrote to the Cabinet Secretary to
expedite the removal of the camp. The Executive Director Children, Young People
and Partnerships noted Midlothian Council is currently using the Scottish
Government guidance on unauthorised camping and conducting dynamic risk
assessments. The Executive Director Children, Young People and Partnerships
reassured Council that the evacuation was carried out with alternative muster points
and that the Council is engaging with the Public Private Partnership (PPP) contractor
and with Police Scotland on the matter. 
Councillor Imrie noted that the view of the Labour Group is that MLDP2 will shape
the next decade in terms of population growth and determine all other aspects of
community life. In that context, the Labour Group considers that it is not possible to
accept additional housing allocations until the infrastructure needs have been met,
and this expense must be funded by either developers or the Scottish Government.
Councillor Imrie noted the current infrastructure is at breaking point and cited schools
being at capacity. Roads are also behind development, and Councillor Imrie noted
that there continues to be longstanding issues with the A701 corridor and the lack of
alternatives to the bypass. The Transport Strategy likewise acknowledges gaps, and
General Practitioners (GP) are also at capacity and not accepting new patients.
Councillor Imrie encouraged Council to pause and not approve any new house
Page 26 of 260

Page 27

building until there is an infrastructure-first approach that will guarantee delivery of
essential services and ensure communities are not overwhelmed by the growth. 
Councillor Milligan seconded Councillor Imrie’s proposal to pause the development
plan until an infrastructure-first approach is agreed, noting that failure to do this will
result in the Council failing Midlothian residents in the future. 
Councillor Parry acknowledged the concerns voiced by the Labour Group however,
it is necessary to provide new homes for the large number of applicants on the
housing waiting list. Councillor McManus agreed that the new housing developments
are providing many young people the chance to buy their first home and remain in
Midlothian. Councillor Parry agreed that MLDP2 should have an infrastructure-
focused approach but warned that not delivering the numbers agreed on the LHLR
could result in planning decisions being taken off the hands of Councillors. 
The Head of Placemaking and Chief Planning Officer confirmed that as housing
targets have been set by the Scottish Government and accepted by Midlothian
Council, if these numbers are not delivered the Scottish Government Reporter may
impose sites on the Council and grant planning permission through the Planning by
Appeal route. This can also result in the Reporter determining no Developer
Contributions will be payable. As MLDP2 seeks to uplift Developer Contributions,
the Council potentially stands to lose considerable amounts of money.  The Head of
Placemaking and Chief Planning Officer advised that the Associated Delivery
Program sets how the Council will respond to the infrastructure pressure from the
increasing homes and the interventions the Council can do in partnership with other
agencies. The Head of Placemaking and Chief Planning Officer also asked to note
that some infrastructure needs, like the Sheriffhall Roundabout separation, are
outwith the control of Midlothian Council. It was acknowledged it is a difficult balance
to strike, as Midlothian Council is obligated to provide those homes but, by not
providing the associated infrastructure, it would also be failing its legal duty. 
Councillor Virgo acknowledged the concerns raised by the Labour Group but noted
reducing it to an argument to pause delivery of housing targets is overly simplistic.
Councillor Virgo suggested it may be necessary to develop a robust stance on the
Developer Contributions and codifying the infrastructure needs so when a
development is received the Developer Contributions can be extended to pay for
other necessary infrastructure so the burden to provide these does not sit solely with
the Council. The Head of Placemaking and Chief Planning Officer advised the draft
delivery programme will go partway to identify what infrastructure will be required. 
Councillor Smaill clarified the argument is not to stop building houses, but to redress
the balance so that the infrastructure is not under pressure as the population grows. 
Councillor Smaill advised it is regrettable how the Scottish Government floor system
has led to additional pressures to growing Local Authorities compared to the
previous system where the Council needs to fund almost all the cost for infrastructure
and would have been able to pause riskier sites. Councillor Smaill suggested the
Council strongly consider the estimated cost of the necessary infrastructure costs of
the proposed growth and noted that developers are unlikely to be able to fund a large
project like a school upfront as their business model is a cash flow one. Councillor
Smaill queried whether the sites on Redheugh are going ahead, as this would fulfil
Page 27 of 260

Page 28

the target set by the Scottish Government. The Head of Placemaking and Chief
Planning Officer advised that any sites selected to meet the housing targets need to
be deliverable, and there are several constraints affecting Redheugh, 
The Chair asked for clarification whether the Labour Group was moving an
amendment on the draft MLDP2 report that was presented for decision. 
As Councillor Imrie left the meeting at 13:12pm due to connection difficulties,
Councillor Milligan clarified the Labour Group’s position would be that it is necessary
to put the infrastructure in place first to mitigate the issues of the increased
population density. Councillor Milligan noted that the Labour Group would move to
amend the report by changing the wording of recommendation C from “Confirm the
Local Housing Land Requirement to be included in the MLDP2 Proposed Plan at
8,851 residential units.” to “no additional housing in this plan”. Councillor Milligan
shared the view that it would be preferable to miss out on the Developer
Contributions rather than have to face the cost of the necessary infrastructure
required for the additional 8,851 homes in MLDP2 and hoped that the public would
agree with this view when MLDP2 goes for consultation. 
Councillor Scott asked Council to note Midlothian is in a fortunate position because
population is rising. Councillor Scott advised a declining population leads to a
stagnant economy, abandonment of rural areas, aging population and young people
leaving the area. Councillor Curran noted constituents in Danderhall do not feel
fortunate, and while they support the new housing, they do not appreciate the
disruption that comes with it. 
Further discussion ensued on the matter of the LHLR. Councillor Virgo noted that as
Midlothian Council already submitted the LHLR figure to the Scottish Government it
is no longer competent to discuss this at this stage. The Head of Placemaking and
Chief Planning Officer confirmed that once the Scottish Government approved the
8,851 target, Midlothian Council moved onto the site selection. The Head of
Placemaking and Chief Planning Officer clarified three quarters of the housing target
is made up of existing sites with planning allocation and with granted planning
permission but that they have not yet been built. MLDP2 is required to provide sites
to meet the target, and these will be assessed based on their individual merits. If the
Scottish Government finds Midlothian Council is not meeting targets, a Reporter can
be appointed to assess the matter and if it is decided that there are insufficient sites
to meet the target then control may be taken away from the Council. 
Councillor Milligan clarified the Labour Group agrees with the already allocated sites
in the MLDP2 going ahead, and that the motion moved by Councillor Imrie would be
to remove any additionality. 
Councillor Imrie rejoined the meeting at 13.34pm. 
Councillor Milligan queried how many houses would be built if the amendment to
remove additionality was passed. The Head of Placemaking and Chief Planning
Officer advised that removing the sites which have already been granted planning
permission would leave a gap of 1,900 homes, which is the additionality that was
referred to by Councillor Milligan.
Page 28 of 260

Page 29

The Chair acknowledged there were many relevant points raised by Elected
Members; however, Council was reminded of the need to vote on the
recommendations of the report. Councillor Pottinger asked for clarification as to
whether the vote would determine if the draft MLDP2 goes for consultation. The
Legal and Governance Manager and Monitoring Officer advised that although there
is a motion moved by Councillor Scott and seconded by Councillor McKenzie and
an amendment moved by Councillor Imrie and seconded by Councillor Milligan to
modify the wording of the MLDP2 recommendations, these do not affect the outcome
of the MDLP2 being put to consultation. 
The Legal and Governance Manager and Monitoring Officer called on Council to a
vote on the report, asking Elected Members to vote on either the motion or
amendment, as described below: 
The Motion moved by Councillor Scott and seconded by Councillor McKenzie to
adopt all recommendations on the report, subject to the following amendments: 
• editing recommendation A in the Gorebridge Place Statement – Local Priories
and Aspirations on paragraph 239 to include the following bullet point
“identifying a site for a new high school in Gorebridge, which could also
accommodate a sports complex (swimming pool, all weather pitches, gym
etc) and health centre on the site”
• amending table 3: Education on the MLDP2 Draft Delivery Programme, to
change the reference to Newbattle High School in “School” column, to
“Newbattle High School or other non-denominational secondary school
provision within existing catchment area”. 
The amendment moved by Councillor Imrie and seconded by Councillor Milligan, to
agree recommendations A, B, D, E, F in the report, and to update recommendation
C to state that "no additional housing will be included in the MLDP2 proposed plan”. 
A vote by roll call was carried out, with 9 Elected Members voting for the motion and
8 voting for the amendment. 
Decision
Council approved the MLDP2 consultative draft subject to the agreed amendments
in the wording of sections the report. 
The Legal and Governance Manager and Monitoring Officer advised there would be
a short recess at 13:55pm. 
The meeting resumed at 14:05pm 
The Chief Officer Children’s Services Partnerships and Communities and Deputy
Chief Social Work Officer and the Head of Development Capital and Entrepreneurial
Projects joined the meeting. 
Page 29 of 260

Page 30

Report No. Report Title Presented by:
8.12 Large Grants 2027-2030 Chief Education Officer 
The Chief Education Officer presented the report for decision which provides an
update on the current Large Grants Programme and the options for the next round
of Large Grants funding 2027-2030. 
The Chief Education Officer noted that Midlothian Council has a long history of grant
awards.  Large Grants has typically been awarded for a three-year period and
aligned to Single Midlothian Plan priorities of reducing poverty, improving health and
achieving net zero. The current allocation for the project is £520,000 per annum and
is in place until March 2027. Therefore, it is necessary to decide on the future of the
Large Grants Programme beyond 27 April 2027.  
The findings of an external review on the Large Grants Programme showed it has
made a positive impact on its beneficiaries. Feedback from the external review
identified some ways to strengthen the process and ensure the impact of the Large
Grants Programme is maximised. The advice recommended the Council make a
commitment to the Real Living Wage and introduce inflation-based uplifts should the
Large Grants Programme continue beyond April 2027. 
Considering this feedback and the tight timescales between now and the end of the
current cycle of the Large Grants Program, Council is recommended to: 
• Note the update and approve the recommendation as detailed in section 3.9
of the report. 
• Approve that the Executive Director for Children, Young People and
Partnerships has devolved responsibility for agreeing the new grants process
and priorities, approving, and signing off the recommendations of the scoring
panel and submitting a report to Council for information only. 
The Chair thanked the Chief Education Officer for their report and invited questions. 
Councillor Scott welcomed the report and moved option 3 as detailed in section 3.9
of the report, which is to continue the Large Grants allocation with inflation-based
uplifts throughout the 3-year period. 
Councillor Scott also moved an amendment to increase the Large Grants allocation
from £520,000 to £600,000 per annum, to keep up with inflation if the Executive
Director Children, Young People and Partnerships can identify funding within the
Education budget. Councillor Scott noted that the funding allocated to Large Grants
has not increased in the past 8 years, and that workers in the voluntary sector are
working under increasingly more challenging circumstances after the disappearance
of the UK Prosperity Fund and the Local Growth Fund. Councillor Scott added that
the third sector organisations support the most vulnerable members of society by
providing a hand up rather than a handout and were responsible for communities
getting through the Covid pandemic. Councillor Scott noted past recipients of Large
Grants funding are very prominent Midlothian-based third sector organisations and
charities such as Midlothian Young People Advice Service (MYPAS), Mayfield and
Page 30 of 260

Page 31

Easthouses Development Trust (MAEDT), Gorebridge Development Trust, Kinship
Care Midlothian, and Grandparents Parenting Again among others. Councillor Scott
asked fellow Elected Members to support the work done by third sector workers and
volunteers by increasing the allocation of the Large Grants project in the next 3-year
cycle and ensuring it also receives inflation-based uplifts.   
Councillor Milligan agreed with the amendment proposed by Councillor Scott,
however queried how the additional £80,000 funding requirement would be met if
the Executive Director Children, Young People and Partnerships could not identify
this funding through the Education budget. The Chief Financial Officer and Section
95 Officer advised the inflationary uplift on the original requested funding of
£520,000 would be consumed in the budget setting. In terms of the additional
£80,000 requested by Councillor Scott and its associated inflationary uplifts, this
would require consideration if the Executive Director Children, Young People and
Partnerships were unable to find any additionality in the service budgets to meet this
requirement. 
Councillor Smaill asked for some confirmation on what index system would be used
to consider inflationary uplifts. The Chief Financial Officer and Section 95 Officer
noted the Consumer Prices Index (CPI) may be the most appropriate system,
however noted that other Officers may wish to recommend another system. 
Councillor Parry seconded the motion to approve the recommendations of the report
and the amendment to increase the Large Grants allocation from £520,000 to
£600,000 per annum with inflation-based uplifts. 
The amended report was moved by Councillor Scott, seconded by Councillor Parry. 
Decision
Council noted and approved the recommendations of the report and the amendment
to increase the Large Grants allocation from £520,000 to £600,000 per annum with
inflation-based uplifts. 
Report No. Report Title Presented by:
8.13 Woodburn Additional Support Needs
Consultation Chief Education Officer 
The Chief Education Officer presented the report for decision on behalf of the
Executive Director Children, Young People & Partnerships. The report advises
Council of the outcome of the statutory consultation on the proposal to formally
establish an Additional Support Needs (ASN) provision at Woodburn Primary School
under the leadership of the Head Teacher and seeks approval for the
recommendations outlined above. 
The ASN provision had been running onsite since December 2024 as Mayfield pupils
relocated to Easthouses earlier than planned. This consultation put to the public was
to formalise this arrangement. The statutory consultation on the proposal was
Page 31 of 260

Page 32

undertaken in the period from Thursday 12 February 2026 to Thursday 2 April 2026.
The statutory report on the outcome of the consultation was published on Monday 1
June 2026 and provides full details of the process undertaken, representations made
and His Majesty’s Inspectorate of Education in Scotland (HMIES)’s independent
report on the proposal. 
The Chief Education Officer noted that 65 responders engaged with the consultation.
87.7% percent of these responders were in favour of the proposal to formalise the
arrangement to maintain the ASN provision in Woodburn Primary, and 78% also
supported the Head Teacher leading the ASN provision. 
Council is recommended to approve the following: 
• An Additional Support Needs (ASN) stage will be formally established at
Woodburn Primary School from August 2026; 
• The ASN stage will be under the leadership of the Head Teacher of Woodburn
Primary School; 
The Chair thanked the Chief Education Officer for their report and invited
questions. 
Councillor Scott welcomed the outcome of the consultation and moved to approve
the recommendations of the report. 
Councillor Scott asked for reassurance that the necessary works to ensure learners’
safety will be completed during the summer. Councillor Scott also queried the plans
for those learners in the Woodburn ASN provision who will transition to the new
school campus in Mayfield when this opens in August 2027. The Chief Education
Officer advised that there are early plans to support a slow and steady transition to
ensure maximum success. The parents of those children that will transition to the
new campus have already been contacted, and an interim principal teacher has also
been appointed to manage the process for learners, families, and staff. 
Councillor Parry seconded the motion to approve the recommendations of the report. 
Councillor McKenzie and Councillor Russell voiced their support for the proposal,
noting that families will benefit from a provision that meets learners’ needs, and that
the Head Teacher at Woodburn is an excellent candidate to oversee this provision. 
The report was moved by Councillor Scott and seconded by Councillor Parry. 
Decision
Council approved the report and its recommendations. 
Page 32 of 260

Page 33

9. Private Reports 
Exclusion of Members of the Public
(A) TO CONSIDER RESOLVING TO DEAL WITH THE UNDERNOTED BUSINESS IN PRIVATE IN TERMS OF
PARAGRAPHS 1, 8 AND 9 OF PART 1 OF SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT
1973 - THE RELEVANT REPORTS ARE THEREFORE NOT FOR PUBLICATION; AND
(B) TO NOTE THAT NOTWITHSTANDING ANY SUCH RESOLUTION, INFORMATION MAY STILL REQUIRE
TO BE RELEASED UNDER THE FREEDOM OF INFORMATION (SCOTLAND) ACT 2002 OR THE
ENVIRONMENTAL INFORMATION REGULATIONS 2004. 
10. Date of next meeting 
The next Council meeting is scheduled for Tuesday 22 September 2026. 
The public section of the meeting concluded at 14:20pm. 
Page 33 of 260

Page 34

Page 34 of 260

Page 35

Midlothian Council Minute Volume
Presented to the Meeting
of Midlothian Council
on Tuesday, 22 September 2026
Midlothian Council
Tuesday 22 September 2026
Item No 5.2
Page 35 of 260

Page 36

1   Minutes of Meetings submitted for Approval
No items for discussion
2   Minutes of Meetings submitted for Consideration
Minute of the Meeting of the Audit Committee on 23 February 2026
Minute of the Meeting of the Performance Review and Scrutiny
Committee on 24 March 2026
Minute of the Meeting of the Local Review Body on 11 May 2026 
Minutes of Meetings submitted for Information  3 
Minute of the Meeting of the Special Midlothian Joint Integration Board on
26 March 2026
Minute of the Meeting of the Midlothian Joint Integration Board on 2 April
2026
Page 36 of 260

Page 37

Midlothian Council
Tuesday 22 September 2026 
Item No 5.3     
Midlothian Council - Action Log 
No Date of
meeting
Item No and Title Action Action
Owner
Expected
completion
date
Comments
1 24/02/2026 
31/03/2026
8.7 Fees and Charges
2026/27 
Following the approval of this paper at
Council, continue cross-party discussions 
Assess the impact of changes to fees and
charges for After School Clubs and Nurseries. 
Elected
Members /
Council Officers 
Executive
Director
Children, Young
People &
Partnerships
Complete 
October 2026
Recommended for Closure 
Discussed at BTSG on 2 March –  
actions contained within the BTSG 
Action Log. 
Work ongoing and an update will be
provided to BTSG in due course. 
2 31/03/2026 8.5 Midlothian Local
Housing Strategy
2026/27 to 2030/31
Following the deployment of the green bin,
review the provision of bin stores for blocks of
flats and confirm the locations.
Executive
Director Place
June 2026 Recommended for closure
Bin store locations identified between
Waste Services and Housing Services.
Engagement with respective Ward
Members. 
Page 37 of 260

Page 38

No Date of
meeting
Item No and Title Action Action
Owner
Expected
completion
date
Comments
3 31/03/2026 8.5 Midlothian Local
Housing Strategy
2026/27 to 2030/31 
Provide a report detailing the findings of a
comparison between a Passivhaus and a
standard Council house build in terms of
energy efficiency and savings.
Head of
Development -
Capital and
Entrepreneurial
Projects 
November 2026 In Progress with report expected to
November Council meeting.
4 23/06/2026 8.1 Financial
Monitoring 2025/26 -
General Fund Revenue
Waste Disposal - Provide further information
on the usage and available capacity to
Council following the meeting with the City of
Edinburgh Council to address disparity and a
Value for Money report.
Executive
Director Place
December 2026 VFM report received. Waste capacity
concerns acknowledged and further
engagement continuing with CEC to
resolve and also consider further
opportunities.
5 23/06/2026 8.1 Financial
Monitoring 2025/26 -
General Fund Revenue
Review the Roads Services underspend and
consider whether this can be repurposed to
update degraded while lines at junctions.
Executive
Director Place
September
2026
Recommended for Closure
Spend flexibility within the service budget is
available. 
6 23/06/2026 8.2 Housing Revenue
Account: Revenue and
Capital Final Outturn
2025/26 and Capital
Plan 2026/27 - 2028/29
Confirm the percentage of the Scottish
Government Housing Support Funds that
Midlothian receives.
Chief Financial
Officer and
Section 95
Officer
Complete Recommended for Closure
For the Affordable Housing Supply
Programme, the Scottish Government have
provided individual Council allocations for
financial years 2026/27 to 2029/30 totalling
in 2026/27 £704.470m, 2027/28
£723.544m, 2028/29 £745.250m and
2029/30 £767.608m. Midlothian Council’s
individual shares are at 1.51% being
£10.586m, £10.90m, £11.231m and
11.448m. 
Actual funding received is matched to
individual Council house building
programmes and will vary from the
amounts shown above.
Page 38 of 260

Page 39

No Date of
meeting
Item No and Title Action Action
Owner
Expected
completion
date
Comments
7 23/06/2026 Medium Term Financial
Strategy 2027/28 to
2028/29
Share MTFS projections for the next five
years with Elected Members.
Chief Financial
Officer and
Section 95
Officer
August 2026 These will be shared with Elected
Members in advance of the next
scheduled Council meeting. 
Page 39 of 260

Page 40

Page 40 of 260

Page 41

Page 41 of 260

Page 42

Page 42 of 260

Page 43

MOTION
Midlothian Council Meeting 22nd September 2026
This Council congratulates the Midlothian Education and Digital Services Teams on the
findings of an independent review of the Equipped for Learning (EFL) Programme. The
aim of EFL was to equip all Midlothian learners with the digital skills they need for
learning, life and work and to ensure all learners had the same chance to succeed. The
report celebrates the pedagogy-first approach to supporting, extending and enhancing
learning, teaching and assessment, and the positive impact this has had on learners,
the professional growth of staff, and the inclusion of families in learning.
This Council
1. Welcomes the publication of the independent impact study, ‘Equipped for
Learning – an independent review of impact (2021-2026)’, authored by Dr. Fiona
Aubrey-Smith and unveiled at Newbattle Abbey College in Dalkeith on 27/28
August 2026.
2. Congratulates Midlothian Council’s Education Services, Susan Ward, Quality
Improvement Officer (3-18), the Digital Inclusion & Learning Team, and Digital
Services for their partnership working and visionary leadership of this £10.5
million transformation project.
3. Applauds the programme for successfully delivering universal digital equity by
providing personal devices (iPads and Chromebooks) to more than 15,000
school-age pupils across Midlothian, ensuring all learners have an equal
opportunity to succeed regardless of financial background.
4. Notes with pride the outstanding educational attainments verified by the five-
year independent review, including:
o A significant 11% increase in literacy attainment across P4, P7, and S3
year groups.
o A rise in numeracy attainment from 72.8% to 80.2% across the same
cohorts.
Midlothian Council
Tuesday 22 September 2026
Item No 7.2
Page 43 of 260

Page 44

Page 44 of 260

Page 45

MOTION TO MIDLOTHIAN COUNCIL
TUESDAY 22nd SEPTEMBER 2026
CLEAN, SAFE AND RESPECTFUL COMMUNITIES
Council reaffirms its commitment to tackling fly-tipping, littering, vandalism, anti-social
behaviour and other environmental crime across Midlothian, using all available powers to
identify and hold those responsible to account.
Council agrees to ask officers to investigate the feasibility of extending the use of available
powers and practice, eg. such as warrant cards, to appropriately trained and designated existing
Council staff, where legally and operationally appropriate, to strengthen their ability to undertake
enforcement activity; including fixed penalty notices, fines and prosecution, to be used more
effectively to deter and tackle these issues.
Council asks officers to report back on the legal, operational and training requirements in the
feasibility of implementing this approach, and monitor the outcomes from expanded use of
powers and practice.
Moved by: Seconded by:
Councillor Dianne Alexander Councillor Colin Cassidy
Midlothian Council
Tuesday 22 September 2026
Item No 7.3
Page 45 of 260

Page 46

Page 46 of 260

Page 47

Midlothian Council 
Tuesday 22 September 2026
Item No 8.1 
Financial Monitoring 2026/27 - General Fund Revenue 
Report by David Gladwin, Chief Financial Officer and Section 95 Officer 
Report for Decision 
1 Recommendations 
Council is recommended to: 
a) Approve the release of earmarked covid recovery funding to part-fund
the current year projected overspend in Scottish Welfare Fund
payments;
b) Note that the Council Leader will write to the Scottish Government
about ongoing financial pressures on the Scottish Welfare Fund;
c) Approve the use of the remaining £2.581 million of Service Concession
retrospection to enhance non-earmarked reserves in 2026/27 (para
5.3);
d) Note that the projected budget gap for 2027/28 rises from £6.176
million to £8.757 million as a consequence of recommendation c) rising
to £14.9 million by 2028/29; and otherwise
e) Note the contents of this report. 
2 Purpose of Report / Executive Summary
2.1 The purpose of this report is to provide Council with information on
projections of performance against service revenue budgets in 2026/27
and to provide commentary on areas of material variance against
budget. The budget performance figures as shown in appendix 1 result
in a net overspend of £4.778 million which represents 1.4% of the
revised budget.  
2.2 On review of quarter 1 projections the Executive Leadership Team put
in place a range of immediate recovery actions including a requirement
for further cost reduction measures, additional scrutiny on high-risk
areas of spend, enhanced monitoring arrangements and re-
enforcement of strict financial discipline across the Council.  
2.3 The projection of the General Fund balance at 31st March 2027 is
£8.456 million assuming Council approval of recommendations a) and
c). Of this £3.741 million is earmarked for specific use leaving a non-
earmarked General Fund balance of £4.715 million. 
Date:  8th September 2026
Report Contact: David Gladwin, Chief Financial Officer and Section 95
Officer
David.Gladwin@midlothian.gov.uk   0131 271 3113 
Page 47 of 260

Page 48

3 Background 
3.1 This report encompasses all performance against revenue budget for
General Fund services.
3.2 Given the ongoing and severe financial pressures, the Chief Executive
has extended the moratorium on any spend that is not business critical
for 2026/27. In addition, robust and formal scrutiny arrangements have
been re-enforced for financial year 2026/27 with Executive Directors
ensuring full awareness throughout their Directorates of the need to
recover the projected overspend by the end of the financial year.
3.3 Sections 3.5, 3.6 and 4.5 outline the additional monitoring measures
implemented by the Chief Executive including enhanced scrutiny of
high-risk areas of overspend, specifically Children’s Services and
Health and Social Care.
Performance against budget
3.4 The material areas of adverse variance against budget at quarter 1 are
outlined in table 1 below which also describes mitigating measures and
next steps. Narrative relating to Midlothian Integration Joint Board
(MIJB) is provided in section 4 below.  
Table 1: Material cost variances against budget   
Budget  Overspend  Reason
Action Plan /
Mitigating
Measures  Next Steps
External
Residential
Placements for
Children
£2,762,000  The number of children
in residential placements
has increased from 16 at
the end of 2025/26 to 26
at quarter 1. 
As reported at Q4, the
number of residential
placements at 31st
March grew from that
reported at Q3 in
2025/26 which was the
point at which the
approved budget for
2026/27 was set. 
This is partially offset by
additional income
received by the council
for children from other
local authority areas in
the care of Midlothian
Foster Carers. 
All placements are
assessed through a
rigorous process
before being
approved. All
externally placed
children have plans
reviewed under a
range of processes
to ensure that needs
are met and plans
exist for a safe return
to family, kin or a
local resource. 
Children’s Services
are committed to
early and
preventative support
to avoid children
entering care.
Investment in Family
Wellbeing, Family
group decision
making and the pilot
of Resilient Included
Supported
Empowered (RISE),
as an intensive
support service for
children at risk of
accommodation,
support this
commitment. 
Council in June
2026 approved a
project to acquire
3 residential
houses to be
operated by the
Council as an
enhanced internal
residential care
provision. This will
reduce costs
associated with
external
placements. Work
to deliver this is
progressing well 
A funding
application was
submitted to the
Scottish
Government
Invest to Save
fund for £1.8m to
enable and
accelerate the
transition to
internal delivery.
Council were
advised on 20th
August that the
bid was
successful in full. 
Page 48 of 260

Page 49

A review of Foster
and Kinship
capacity is
underway with the
aim of expanding
supply of carers
thus providing a
wider range of
options to be
considered as an
alternative to an
external
placement. A
report on this will
be presented to
Council in
November 2026.
Council Fleet £518,000  The cost of maintaining
the Council Fleet
exceeds budget by
£361,000. Fleet
downtime in the current
financial year has been
higher than expected
with a consequent
financial pressure. 
The number and cost of
external vehicle hires
exceeds budget by
£157,000. This is a
combination of the
implementation of Waste
Twin Streaming and fleet
downtime.
Enhanced cost
control measures are
in place whilst a root
and branch review of
the Councils Fleet
operation takes
place. 
Enhanced
authorisation
procedures are in
place pre-hire of
vehicles. 
The number of
external hires has
reduced during Q2.
Root and branch
review of Council
Fleet Operations.
Staff Costs £705,000 An overspend in Sport
and Leisure of £555,000
mainly as a
consequence of using
non-permanent staff to
cover permanent posts. 
Service pressures in
Corporate Solutions
have resulted in fewer
vacancies being held
and some higher one-off
costs for non-permanent
staff 
Use of non-permanent
staff in Children’s
Services to cover staff
absence. 
Partially offset by
vacancies across the
Council. 
Staffing review is
ongoing. 
Service reviews
within Corporate
Solution are ongoing. 
Conclusion of
ongoing absence
management
processes may
soften current
pressures. 
Strengthening of  
enhanced level of
vacancy control. 
Strategic
Workforce Plan is
in place 
Scottish
Welfare Fund
£302,000 Financial support
granted to eligible
claimants exceeds
available funding. 
An options paper
was presented to the
Cost of Living Task
Force on Tuesday 1st
September 2026.
£0.272m of Covid
recovery funding
remains in an
earmarked
reserve, It is
recommended to
release this to
Page 49 of 260

Page 50

fund most of the
2026/27 financial
pressure whilst
also engaging
with the Scottish
Government on
additional funding.
Non-residential
services for
Children
£245,000 Increased spend on
Daycare due to
increased client
numbers particularly
relating to children with
Additional Support
Needs. 
Growth in number of
clients receiving direct
payments.
Growing service
demand continues to
be managed through
scrutiny
arrangements.
Service criteria
has been
amended.
Process is quality
assured and
scrutined prior to
approval, with
earlier
intervention
where possible.
Council Tax
Income
£207,000 At Q1 the growth in
Band D properties is
slower than built into the
approved budget.
There may be a lag
in recording new
properties which will
contribute to the
projected shortfall at
Q1 and unwind as
the year progresses. 
There also remains £0.547 million of Medium Term Financial Strategy
(MTFS) cost reductions either to be finalised or to be fully implemented.
A number of these are taking longer than planned to implement with an
adverse impact on the 26/27 financial position. These are detailed at
appendix 2 and reported to the Business Transformation Steering
Group (BTSG) on a half-yearly basis. Work continues to implement
these as quickly as possible.
Underspends
• A reduction in the number of school pupils assessed as eligible
for transport for school year 2026/27 combined with service
delivery efficiencies results in a projected underspend of
£999,000. 
• Electricity unit prices for both street lighting and council buildings
are significantly lower than those used in creating the 2026/27
budget. This gives rise to a combined positive variance of
£0.692 million at Q1 albeit with ongoing price risk in a volatile
market. Consumption is in line with budget.
• Loan Charges are projected to be underspent by £573,000. The
main factors are:
o Impact of lower capital expenditure for 2025/26 than
expected when the 2026/27 budget was set;
o Deferral of borrowing to later in 2026/27 than budgeted
although borrowing rates remain higher than those used
to set the budget;
o Higher than forecast surplus cash related directly to
timing of capital expenditure thus providing opportunity to
generate some deposit income; 
Page 50 of 260

Page 51

• Sport and Leisure income exceeds budgeted targets by
£796,000, The most notable areas are:
o A continued rise in membership income which is
projected to exceed budget by £589,000;
o Budgeted income in 2026/27 for the Alpine Coaster was
based on 2025/26 customer numbers. They have risen
further in 2026/27 thus give additional income of
£118,000;
o Income from general facility use at Midlothian Snowsports
centre is higher than budgeted by £89,000.
• Insurance premiums change annually on 1st July. In recent years
premiums have risen by a large percentage which was reflective
of the market generally and also the councils claims experience.
The 2026/27 budget was set in anticipation of a similar rise.
However, despite a significant percentage rise, it was lower than
provided for. This, along with a relatively lower volume of claims
on the Council during Q1, gives rise to a projected underspend
of £269,000.
• A funding bid was made to the Scottish Government for specific
financial support for some of the cost of living interventions in
Midlothian during 2026/27. The outcome of this bid was
unknown at the time the 2026/27 budget was finalised with the
proviso that if successful, funding would be used to offset
budgeted costs. The Council was awarded £201,000 in 2026/27
on a one-off basis.
3.5 On review of quarter 1 projections, the Executive Leadership Team
initiated some immediate actions. Deep dive sessions were held for
both Adult Social Care and Childrens Services spend with particular
scrutiny on proposed recovery actions and enhanced expenditure
controls. For recurring areas of financial pressure like fleet and sport
and leisure staffing, Executive Directors are preparing a scope and
implementation timeline for completing detailed reviews. 
3.6 In addition, alongside the continued financial discipline measures
referenced in section 3.2, the essential requirement for services to live
within available budget has been stressed and all service areas need to
comply. Executive Directors are ensuring full awareness throughout
their Directorates. 
Page 51 of 260

Page 52

4 Delegation of resources to Midlothian Integration Joint Board
4.1 The approved budget provided for the allocation of £75.123 million to
the MIJB for the provision of delegated services. Minor budget
adjustments give a revised budget of £75.125 million. Q1 projections
show an overspend of £3.004 million on Adult Social Care services
which is made up of:
• A shortfall in delivery of approved savings for 26/27 of £1.313
million;
• The impact of additional care packages during Q4 of 2025/26
of £0.823 million;
• Further growth in care packages in 2026/27 of £0.635 million;
and
• Funding pressures relating to commissioned contracts of
£0.233 million.
4.2 In accordance with the Integration Scheme the MIJB is required to
deliver delegated services within budget allocations from the Council
and NHS Lothian and, where any overspend is projected, to put in
place a recovery plan to address that. As a last resort the integration
scheme allows for the MIJB to seek additional financial support from its
partners, either by way of an additional budget allocation or by
“brokerage” (provision of additional resources in a year which are
repaid in the following year). 
4.3 Financial Monitoring reports covering all of the MIJB activities are
formally presented to the Integration Joint Board and are available on
the committee management section of the Council website:- 
Midlothian Integration Joint Board (cmis.uk.com) 
4.4 MIJB met on Thursday 20th August and discussed Q1 projections. In
support of a recognised need for urgent recovery action MIJB agreed
that an updated financial recovery plan be brought to MIJB Audit and
Risk Committee on Thursday 10th September 2026 rather than wait for
the next scheduled MIJB on Thursday 24th September 2026.
4.5 In advance of formal reporting as described in the previous paragraph
The Chief Executive, The IJB Chief Officer, the Chief Social Worker
and the Chief Financial Officer met on Wednesday 2nd September to
scrutinise recovery plans including £1.313 million of savings measures
which MIJB have not yet delivered. 
Page 52 of 260

Page 53

5 General Fund Reserve 
5.1 The balance on the General Fund as at 31 March 2027 is as follows: 
£ million £ million
General Fund Reserve at 1 April 2026  24.418
Planned movements in reserves  
Application of Budgets carried forward from
2025/26 for use in 2026/27  (7.332) 
Utilisation of retrospective service concessions to
fund costs in 2026/27  (4.093) 
Transformation funding applied to date during
2026/27  (0.031) 
(11.456)
Overspend per appendix 1  (4.778)
Recommendation (a) – release covid recovery
earmarked reserve   0.272
General Fund Balance at 31 March 2027  8.456 
An element of the General Fund is earmarked for specific purposes
and this is shown below: 
£ million
General Fund Balance at 31 March 2027 8.456
Earmarked for specific purposes 
To support delivery of the Transformation Blueprint (1.588)
Planned use of Service Concession Retrospection as part
of balancing the 2027/28 budget  (2.581)
Planned use of Loans Fund Review Savings (2.153)
General Reserve at 31 March 2027 2.134
Application of Service Concession Retrospection in
2026/27 rather than in 2027/28 (recommendation c / para
5.3)  2.581
Updated General Reserve at 31 March 2027 4.715 
5.2 The Reserves Strategy approved by Council on 12th February 2019
requires Council to maintain an adequate level of General Reserve to
provide a contingency for unforeseen or unplanned costs. In the
financial context at that time Council approved the adoption of 2% of
the approved budgeted net expenditure (excluding resources
delegated to MIJB) to be considered a minimum. This now equates to
£5.3 million. Council also agreed that where projections indicate that
the 2% minimum General Reserve balance be breached an immediate
recovery plan be implemented to recover the position, failing which, the
next available budget would need to provide for the reinstatement of
reserve position. 
5.3 The MTFS assumes use of the remaining value of Service Concession
retrospection of £2.581 million in 2027/28 to contribute to achieving a
balanced budget. In light of projections laid out in this report and the
requirements of the Council’s Reserves Strategy, it is recommended to
bring forward use to the current financial year. This approach will be
reviewed as the year progresses. 
Page 53 of 260

Page 54

5.4 The General Reserve of £4.715 million, assuming recommendations in
this paper are approved, is £0.6 million below the minimum set in the
Reserves Strategy. It must continue to be viewed both in the context of
£5.3 million of underlying service pressures in 2026/27 (Appendix 1 -
General Fund Services Net Expenditure) and the latest MTFS
projected gap of approximately £14.9 million through to 2028/29. 
5.5 Until there is significant progress towards a balanced MTFS it remains
sound financial practice to maintain a substantial buffer in the General
Reserve to offset any further adverse performance against budget or
delays in delivering savings measures. This will be a key part of
2027/28 budget setting deliberations. 
6 Report Implications (Resource, Digital and Risk) 
6.1 Resource 
The performance against budget set out in this report presents the
projected position for the year. Work continues across the council to
reduce overspends and to progress at pace delivery of approved
savings. 
6.2 Digital 
Increased reliance and investment in digital solutions and digital first
solutions will be a key element of future plans. 
6.3 Risk 
Section 95 of the Local Government (Scotland) Act 1973 requires all
Local Authorities in Scotland to have adequate systems and controls in
place to ensure the proper administration of their financial affairs. 
The assessment of performance against budgets by services is
underpinned by comprehensive financial management and budgetary
control arrangements. These arrangements are central to the
mitigation of financial risk. 
Areas of council spend are determined by immediate demand
pressures that must be met. Although unknown at the point of
presenting financial projections they present a significant financial risk.
Maintaining a non-earmarked General Fund Reserve in accordance
with the approved Reserves Strategy provides some mitigation of this
risk. 
Ensuring that adequate systems and controls are in place reduces the
risk of significant variances arising, and where they do arise they help
to ensure that they are identified and reported on and that appropriate
and robust remedial action is taken. The primary purpose of this report
is to provide an assessment of performance against budget for the full
year. The material variances detailed in the report highlight that the
financial management and budgetary control arrangements require
continual review and enhancement if financial risk is to be effectively
mitigated during the year. 
Page 54 of 260

Page 55

There are some areas where effective forecasting of spend against
budget can be hindered due to incomplete service information which
in previous years has resulted in previously unreported or significantly
adjusted variances at the financial year end. CMT continues to
consider these areas and supports actions to address the underlying
issues and mitigate the risk associated with them.   
The Council recognises the potential for compensation claims deriving
from Scottish Government’s Limitation (Childhood Abuse) (Scotland)
Act 2017 which removes the three year time limit on claims of child
abuse. Some claims will be historic and relate to Lothian Regional
Council, Midlothian District Council or their predecessors and some
will date post reorganisation and relate to Midlothian Council, and so
presents a risk that would further reduce reserves from those currently
projected.   
6.4 Ensuring Equalities 
As changes to existing plans are developed, the assessment of the
impact of these proposals in relation to their impact on equalities and
human rights will be carried out. This will help to ensure wherever
possible that there are no negative impacts on equality groups or
potential for infringement of individuals’ human rights from the any of
the proposals. 
6.5 Additional Report Implications 
See Appendix A 
Page 55 of 260

Page 56

Appendices 
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
The existing financial plans support the delivery of the key priorities in
the Single Midlothian Plan. As the impact on the Council of the
pandemic and recovery continues to unfold over the financial year any
changes in the availability and allocation of resources will need to be
considered in parallel to the actions proposed to continue to delivery
key priorities. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value. 
A.5 Involving Communities and Other Stakeholders 
The development of the Medium Term Financial Strategy reflects
community consultation exercises carried out in 2019 and again in
2022 to help shape the drafting of the “Midlothian Promise” and the
development of the Council’s Longer Term Financial Strategy.   
In addition, there is continued engagement with the recognised Trade
Unions on the financial position. 
Page 56 of 260

Page 57

A.6 Impact on Performance and Outcomes 
The Financial Strategy facilitates decisions on how Council allocates
and uses its available resources and as such has fundamental
implications for service performance and outcomes. The lasting
financial consequences of the pandemic will impact on the availability
and allocation of resources in pursuit of key outcomes as set out in
the Single Midlothian Plan for both the immediate and longer term and
therefore the ability of the Council to continue to deliver services in a
financial sustainable manner. 
A.7 Adopting a Preventative Approach 
Maintaining the effectiveness of the Financial Strategy will support the
prioritisation of resources to support prevention. 
A.8 Supporting Sustainable Development 
There are no direct sustainability issues arising from this report and the
council continues work to mitigate as far as feasible any sustainability
issues which arise as a consequence of any of the changes to existing
plans. 
Appendix 1 Performance Against Budget 
Appendix 2 Approved Savings Delivery
Page 57 of 260

Page 58

Page 58 of 260

Page 59

MIDLOTHIAN COUNCIL
Appendix 1
GENERAL FUND 2026/27
Performance against budget
Revised Budget Revised Budget Revised Budget (Underspend)
Function Approved Budget Expenditure Income Net Outturn / Overspend
£ £ £
Management and Members 5,455,889 5,452,503 0 5,452,503 5,409,503 (43,000)
Place
Corporate Solutions 27,264,985 47,439,879 (20,065,302) 27,374,577 28,129,577 755,000
Place 31,476,336 46,317,075 (13,048,494) 33,268,581 33,427,581 159,000
Central Costs 1,123,418 3,081,193 0 3,081,193 2,812,193 (269,000)
People and Partnerships
Midlothian Integration Joint Board 75,122,525 84,583,205 (9,458,343) 75,124,862 78,128,862 3,004,000
Non-Delegated Services - Community Safety and Welfare Rights 743,723 908,289 (80,154) 828,135 830,135 2,000
Childrens Services, Partnerships and Communities 23,634,016 26,180,061 (1,056,425) 25,123,636 28,304,636 3,181,000
Facilities/Sport & Leisure 11,863,790 22,086,126 (10,220,331) 11,865,795 11,479,795 (386,000)
Education 163,006,392 171,112,289 (5,971,585) 165,140,704 164,065,704 (1,075,000)
Lothian Valuation Joint Board 672,924 672,924 0 672,924 672,924 0
Non Distributable Costs 810,000 810,000 0 810,000 810,000 0
GENERAL FUND SERVICES NET EXPENDITURE 341,173,998 408,643,544 (59,900,634) 348,742,910 354,070,910 5,328,000
Loan Charges 8,712,000 8,712,000 0 8,712,000 8,139,000 (573,000)
NDR Discretionary Relief 70,300 70,300 0 70,300 70,300 0
Investment Income (50,736) 0 (50,736) (50,736) (50,736) 0
Service Concessions - in-year (3,227,000) 0 (3,227,000) (3,227,000) (3,227,000) 0
Allocations to HRA, Capital Account etc. (6,003,564) (6,003,564) 0 (6,003,564) (6,003,564) 0
340,674,998 411,422,280 (63,178,370) 348,243,910 352,998,910 4,755,000
less Funding:
Scottish Government Grant (255,982,000) 0 (256,188,000) (256,188,000) (256,372,000) (184,000)
Council Tax (80,600,000) 0 (80,600,000) (80,600,000) (80,393,000) 207,000
Utilisation of Reserves 4,092,998 411,422,280 (399,966,370) 11,455,910 16,233,910 4,778,000
Page 59 of 260

Page 60

Page 60 of 260

Page 61

MIDLOTHIAN COUNCIL Appendix 2
GENERAL FUND 2026/27
Delivery of Approved Savings
Savings 26/27 26/27
Target Outturn Variance Narrative
Place Management Review 1,256 1,256 0
Leadership Review - Corporate Solutions 45 45 0
Rationalisation of the office Estate 250 250 0
Shared on-call Service 10 10 0
Review of Temporary Accommodation 200 200 0
HRA Void Clearances 15 15 0
School and ASN Transport Review 30 30 0
School Admin Support 20 20 0
Non-delegated HSC efficiencies 45 45 0
Reduction of Specialist Instructors 35 35 0
Further review of S&L 44 44 0
Reduce Shrub Bed maintenance 36 36 0
PPP school closures during holidays 40 40 0
Public Toilets closure 81 57 24 Remaining facilities offered for sale or Community Asset Transfer
Trading Standards Regional collaboration 90 90 0
Cease Night Security at Stobhill Depot 150 150 0
Safety Advisory Group 25 25 0
Remove 5 FTE Grade 1 Cleaners 125 76 49 Incremental workforce reductions are being realised
Location and Vehicle Advertising 25 25 0
Wrap Around Care 75 0 75 Plan to deliver this to be developed.
Land Services Review 75 75 0
Education Third Party Contracts Review 500 500 0
Admin Review 34 34 0
1% DSM Budget 400 400 0
Transformation of the School Week 2,000 2,000 0
Continuous Improvement Team 28 28 0
Internal Audit 55 55 0
Reduction in offer to MIJB 1,133 1,133 0
Communities and Lifelong Learning Review 250 250 0
Parking Fines 100 26 74 Fine income offset by running costs. Link to development of parking strategy
Roads Maintenance - replace maintenance costs with £2.5m capital 267 267 0
Reduction of Dry-Side and Wet-side facilities at the weekend in Leisure Centres 177 72 105 New staffing rotas being developed but not yet implemented
Reduction in Cleaning Frequency in some Council Buildings 132 62 70 Incremental workforce reductions are being realised
Review of Service Contracts in CYPP Directorate 500 500 0
CLLE Efficiency 75 75 0
Review of CYPP Central Teams 200 200 0
Lets and Charges for After School Clubs 40 40 0
Delivery of Business Critical Spend 717 717 0
Client Transport 100 100 0 Cost reductions exceed target
Review of Council owned assets 50 0 50
Commercial Opportunities at Vogrie 50 0 50
Options to expand Council offering for young people during school holidays 25 0 25
Investment in Sport and Leisure Assets 200 200 0 Additional income exceeds target
Expansion of out of school childcare provision 25 0 25
Total 9,730 9,183 547
Future Dated Targets
Online Customer Engagement 235
Reduce Net cost of Benefits by 6% 238
Total 10,203
Page 61 of 260

Page 62

Page 62 of 260

Page 63

Midlothian Council
Tuesday 22 September 2026
Item No 8.2   
Housing Revenue Account
Revenue Budget and Capital Plan 2026/27 
Report by David Gladwin, Chief Financial Officer and Section 95 Officer 
Report for Noting 
1 Recommendations
Council is recommended to note the contents of this report. 
2 Purpose of Report / Executive Summary
The purpose of this report is to provide Council with a summary of
expenditure and income to 3rd August 2026 for the Capital Plan and a
projected outturn for both the Housing Revenue Account (HRA) and
Capital Plan for 2026/27.
The summarised financial performance for 2026/27 is:
• Projected capital investment in the year totalling £40.730 million;
• A projected net underspend in the revenue account of £1.121
million;
• A projected HRA general reserve at 31st March 2027 of £29.491
million. 
Date: 14th August 2026 
Report Contact: 
Name: Lisa Young 
Email: lisa.young@midlothian.gov.uk 
Page 63 of 260

Page 64

3 Background 
3.1 Capital Plan 2026/27 
The 2026/27 Capital Plan budget has been revised to reflect the
current profile of spend as shown in appendix B. Capital investment in
the year is projected to be £40.730 million and there are currently no
material variances anticipated for the financial year. 
There is work underway to develop a housing stock capital
improvement plan to relieve pressure on the general repairs budget.
The works will include a programme for replacing kitchens, bathrooms
and fencing and is due to be reported to Capital Plan Asset
Management Board for November Council. 
3.2 Revenue Account 2026/27 
For 2026/27 there is currently a projected underspend of £1.121
million against budget, as shown in appendix C, this is due to:- 
• The housing stock capital improvement programme, mentioned
in the previous section of this report, has been reflected in the
current year projections and is expected to generate an
underspend in responsive repairs by approximately £1.363
million;
• Reflection of the latest delivery programme for the HRA capital
plan and the availability of reduced rate PWLB loans
specifically available for the HRA will result in lower borrowing
costs of £0.606 million; 
This is offset by:- 
• The number of void repairs has been higher than budgeted due
to higher number of repairs works required on properties
switching between temporary needs and general needs
accommodation to bring the properties up to a lettable
standard. The overspend for void repairs is currently estimated
to be £0.596 million;
• Insurance costs are expected to be overspent by £0.190 million
mainly due to an increase in the level of insurance premiums
and claims related to HRA properties.
The HRA general reserve balance is projected to be £29.491 million at
31st March 2027, which is committed to finance existing investment
commitments to 2041/42. 
Page 64 of 260

Page 65

4 Report Implications 
4.1 Resource
There are no direct resource implications arising from this report. 
4.2 Digital
There are no direct digital implications arising from this report.
4.3 Risk
The principal risks are around the issue of affordability, ensuring that
the investment in new build and the existing stock can be made
without having to impose unacceptable increases on weekly rents.
This is mitigated by the adoption of a long term financial strategy and
modelling which demonstrates that existing investment commitments
are sustainable.
There is also the risk of capital spend being lower than projected due
to delays on projects, particularly in the current climate , this could
result in lower debt charges causing the Housing Revenue Account
Reserve balance to increase by more than projected. 
4.4 Ensuring Equalities
There are no equality issues arising directly from this report. 
4.5 Additional Resource Implications
See Appendix A. 
Appendices
Appendix A – Additional Resource Implications
Appendix B - Capital Plan 2026/27
Appendix C – Revenue Account 2026/27 
Page 65 of 260

Page 66

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value. 
A.5 Involving Communities and Other Stakeholders 
The report does not directly relate to involving communities. 
A.6 Impact on Performance and Outcomes 
The report does not directly impact on Midlothian Council’s
performance and outcomes. 
A.7 Adopting a Preventative Approach 
The report does not directly relate to adopting a preventative approach. 
A.8 Supporting Sustainable Development 
The report does not directly relate to supporting sustainable
development.
Page 66 of 260

Page 67

MIDLOTHIAN COUNCIL Appendix B
HOUSING REVENUE ACCOUNT
CAPITAL PLAN 2026/27
Revised
Budget
Actuals
To Date
Projected
Outturn
(Under)/Over
Spend
CAPITAL GRANTS AND RECEIPTS £'000 £'000 £'000 £'000
Scottish Government Grants
-Affordable housing supply programme 7,128 0 7,128 0
-Off market purchases 550 0 550 0
Council tax on second homes 23 0 23 0
Borrowing requirement 33,029 8,555 33,029 0
Total Capital Grants and Receipts 40,730 8,555 40,730 0
APPROVED CAPITAL EXPENDITURE £'000 £'000 £'000 £'000
Investment in Additional Housing Stock
-New social housing phase 3-5 20,761 3,853 20,761 0
-New social housing phase 6 4,624 61 4,624 0
-Dalkeith town centre regeneration - social housing 500 167 500 0
-Open market purchases 1,589 918 1,589 0
Capital Repairs and Enhancement of Existing Stock
-Scottish Housing Quality Standards (SHQS) Repairs 1,652 473 1,652 0
-Energy Efficiency Standard for Social Housing (EESSH) 5,600 2,397 5,600 0
-Upgrade Central Heating Systems 987 447 987 0
-Damp remediation works 2,000 82 2,000 0
Other Capital Expenditure
-Aids and adaptations 540 148 540 0
-Backdated developer contributions 1,000 0 1,000 0
-Bonnyrigg District Heating Scheme (BDHS) meters 1,476 10 1,476 0
Total Capital Expenditure 40,730 8,555 40,730 0
Page 67 of 260

Page 68

MIDLOTHIAN COUNCIL Appendix C
HOUSING REVENUE ACCOUNT 2026/27
Revised
Budget
Projected
Outturn
(Under)/Over
Spend
Average Number of Houses 7,951 7908 (43)
£'000 £'000 £'000
EXPENDITURE
Repairs and Maintenance
-Responsive 7,400 6,037 (1,363)
-Planned 938 964 26
-Void 3,181 3,777 596
-Decant/Compensation 79 79 0
Total Repairs 11,598 10,857 (741)
Supervision and Management
-Allocations to General Fund 6,004 6,004 0
-Landscaping 740 740 0
-Insurance 451 641 190
-Other Supervision and Management 398 402 4
Total Supervision and Management 7,593 7,787 194
Capital Financing Costs 20,353 19,747 (606)
Void Rent and Council Tax 1,414 1,374 (40)
Other Expenditure 2,213 2,251 38
Total Expenditure 43,171 42,016 (1,155)
INCOME
Dwelling Rents (40,134) (40,123) 11
Garage Rents (748) (741) 7
Service Charge Income (347) (331) 16
Other Income (70) (70) 0
Total Income (41,299) (41,265) 34
Net (Income)/Expenditure for HRA Services 1,872 751 (1,121)
Movement in Housing Revenue Account Reserve
Housing Revenue Account Reserve Opening Balance (30,242)
(Enhancement)/impairment during the year as above 751
Reserve earmarked to fund capital investment plans (29,491)
Page 68 of 260

Page 69

Midlothian Council
Tuesday 22 September 2026
Item No 8.3   
General Services Capital Plan - 2026/27 Quarter 1 Monitoring 
Report by David Gladwin, Chief Financial Officer & Section 95 Officer 
Report for Decision 
1 Recommendations 
It is recommended that the Council:- 
1. Note the inclusion of the projects listed in Section 3.1 in the
General Services Capital Plan (GSCP)
2. Approve the addition of the new projects to the GSCP, as outlined
in Section 3.2, and the adjustments to project expenditure
budgets in the GSCP as set out in Section 3.3;
3. Note the forecast outturn for expenditure, funding and borrowing,
as outlined in Section 4. 
2. Purpose of Report 
The purpose of this report is to provide Council with:- 
• An update of the GSCP incorporating information on further
additions to the Capital Plan for approval and adjustments to
existing project budgets (Section 3);
• Information on the projected performance against budget for
2026/27 (Section 4);
• Update on the Capital Fund (Section 5). 
Date 07 September 2026
Report Contact:
Gary Thomson, Senior Finance Business Partner
gary.thomson@midlothian.gov.uk  
Page 69 of 260

Page 70

3 Update of General Services Capital Plan 
3.1 Projects endorsed by Council and to be added into the Plan 
The plan now incorporates the projects approved by Council on 23 June
2026 in respect of the following:- 
• Enhancing Midlothian’s Residential Care Capacity: Acquisition of
three residential houses across Midlothian to provide internal residential
care provision for children and young people.  Capital expenditure
budget of £2.115 million, phased fully in 2026/27, to be fully funded by
prudential borrowing. 
3.2 Projects presented for endorsement in the Plan 
The following projects are presented for endorsement to be fully adopted
within the GSCP:- 
Capital Plan & Asset Management Board (CPAMB) 7 September
2026 
• Active Travel Infrastructure Grant (ATIF) Tier 1: Active travel
improvements across the County, including improved junctions,
installation of new crossing facilities and traffic calming measures.
Delivery of the North Midlothian Network, Shawfair Connections and a
cycle route from Penicuik to Leadburn.  Total capital expenditure budget
of £1.048m million, fully phased in 2026/27 and fully funded by Scottish
Government ATIF Tier 1 Capital Grant of £1.048 million.
• Active Travel Infrastructure Grant (ATIF) Tier 2: For the provision of
Loanhead Road Straiton Path.  Capital expenditure budget of £0.369
million, fully phased in 2026/27 and fully funded by Scottish
Government ATIF Tier 2 Capital Grant of £0.369 million.
• Bus Infrastructure Fund (BIF) Tier 1: For the provision of
replacement/upgraded Bus Shelters, the installation of new Real Time
Passenger Information (RTPI) signs, and an enhanced bus pick up
facility on the A702 near the Flotterstone Inn.  Capital expenditure
budget of £0.215 million, fully phased in 2026/27 and fully funded by
Scottish Government BIF Tier 1 Capital Grant of £0.215 million.
• Road Safety Improvement Fund (RSIF): For the enhancement of
20mph zones across Midlothian (Visible Message Signage, additional
road markings and repeater signage and countdown marker), and road
safety improvements (barrier improvements, resurfacing works and
signage) to Roslin Glen.  Capital expenditure budget of £0.246 million,
fully phased in 2026/27 and fully funded by Scottish Government capital
grant funding of £0.246 million.
• People & Places Projects: For (i) the contribution of staffing time
directly attributable to the delivery of ATIF Tier 1 capital projects, (ii) 
Tour De France 2027 infrastructure improvements on the A7 related to
Active Travel, and (iii) the purchase of bikes.  Capital expenditure
budget of £0.037 million, fully phased in 2026/27 and fully funded by
Scottish Government Local Authority Direct Award (LADA) Capital
Grant of £0.037 million. 
Page 70 of 260

Page 71

3.3 Adjustments to existing project budgets 
The following adjustments to existing project expenditure and income
budgets are included in the GSCP:- 
• FCC Zero Waste – Heat Offtake Facility: Additional £1.360 million
capital expenditure budget (total capital expenditure budget of £2.400
million) to cover higher than expected costs in relation to the Council’s
contribution to the Heat Offtake Facility, to be fully phased in 2026/27 and
fully funded by prudential borrowing.  Approved by full Council on 23 June
2026. 
• Recycling Improvement Fund: Additional £0.019 million capital
expenditure budget, fully matched by £0.019 million of capital grant
funding from Zero Waste Scotland, for the Council’s Recycling
Improvement Fund project.  Capital expenditure & capital grant funding
fully phased in 2025/2 and approved by CPAMB on 3 June 2026. 
• Rosewell Development Trust: Additional £0.067 million capital
expenditure budget, fully matched by £0.067 million of developer
contributions, for improvement works to The Steading community building
in Rosewell (Community History Wall and Disabled Gardening Group
Meeting Shed Space/Workspace).  Approved by CPAMB on 7 September
2026. 
• Acoustic Upgrades to Schools: Widening of scope to cover St. David’s
& King’s Park primary schools.  
Page 71 of 260

Page 72

4 2026/27 Projection against budget 
4.1 2026/27 Budget 
After accounting for the following:- 
• Rephasing of budgets from 2025/26 to 2026/27, and new projects added
to the plan, both as reported to Council on 23 June 2026;
• Including the new projects & adjustments to project budgets as outlined in
Section 3; 
the capital plan expenditure budget for 2026/27 is £125.813 million. 
Page 72 of 260

Page 73

Table 1: Rephasing of project expenditure budgets 
Project Description of amendment to
budget
Previous
2026/27
Budget
£000’s
Revised
2026/27
Budget
£000’s
2026/27
Budget
Movement
£000’s
CHILDREN, YOUNG PEOPLE & ESTATES PROGRAMME BOARD
Mayfield Learning
Campus
Current delay of c. 3 weeks in
project programme with
corresponding rephasing of project
expenditure
28,054 24,742 -3,312
Beeslack Community
High School
Replacement
Requirement to commence a new
procurement process following the
approved revision of scope of the
project in May 2026 along with a
further period of RIBA Stage 2
design has impacted the overall
project programme by
approximately 8 months, resulting
in rephasing of project expenditure
10,653 2,415 -8,238
Penicuik High School The project is progressing well and
is currently ahead of programme,
resulting in expenditure being
ahead of the original planning
assumptions. Consequently,
forecast spend has been rephased
from future financial years into
2026/27 to align with the
contractor's delivery programme
and current progress on site. The
revised profile therefore represents
a more accurate assessment of
expenditure timing and does not
indicate an increase in the total
approved project cost.
9,219 21,772 +12,553
Shawfair All-Through
Campus
Project planning application is now
due to be determined in late
October 2026 rather than the
projected early September 2026.
In addition, whilst the market
testing exercise underway by the
main contractor is progressing, the
review/cleansing of those
packages is taking longer than
anticipated due to a number of
issues. A 2026 start on site is still
expected, with first works
concentrating on enabling works
following the successful
completion of remediation works
carried out by Shawfair LLP.
21,616 19,910 -1,706  
Page 73 of 260

Page 74

Project Description of amendment to
budget
Previous
2026/27
Budget
£000’s
Revised
2026/27
Budget
£000’s
2026/27
Budget
Movement
£000’s
ASSET MANAGEMENT PROGRAMME BOARD
Assistive Technology Service managers are currently
considering various workstreams
involving the use of technology,
with firm plans being drawn up and
spend reprofiled to 2027/28
485 150 -335
Total  70,027 68,989 -1,038 
Based on the rephasing of budgets as shown in Table 1 above, the
rephased budget for the GSCP is £124.775 million. 
In line with this, the expected level of funding available to finance the
plan has also been rephased and totals £31.012 million. 
This results in an in-year budgeted borrowing requirement of £93.763
million. 
Page 74 of 260

Page 75

The projected performance against budget for 2026/27 is shown in table
2 below:- 
Table 2: GSCP Projected Performance against Budget 2026/27 – as
at Quarter 1 
Item 2026/27  2026/27 Actual 2026/27 2026/27 2026/27
Initial Rephased To Projected Variance Carry
Budget*1 Budget 19.07.26 Outturn £000’s Forward
£000’s £000’s £000’s £000’s £000’s
Expenditure 125,813 124,775 16,062 124,763 -12 -1,038
Funding 34,189 31,012 6,523 31,627 +615 -3,178
Borrowing
Required
91,623 93,763 9,539 93,136 -627 
4.2 Expenditure 
Expenditure to 19 July 2026 is £16.062 million with a projected
expenditure outturn of £124.763 million, £0.012 million less than the
rephased budget. 
At this stage it is anticipated that all budgets for the projects detailed in
Appendix 1 will be fully spent in the current year, other than:- 
• Easthouses Primary School: Project complete and final retention
released to contractor.  Minor overspend of £0.003 million against
original £22.044 million project budget;
• Mauricewood Road Bus Shelter: Installation of bus shelter in prior
years and project fully complete, with underspend of £0.004 million
against capital expenditure budget;
• Community Bus Fund: Installation of Bus Trackers installed in prior
years and project fully complete, with underspend of £0.004 million
against capital expenditure budget;
• Millerhill Pavilion: Demolition complete with minor project underspend
of £0.007 million. 
The expenditure to Quarter 1 (£16.062 million) equates to 13% of the
forecast outturn expenditure (£124.763 million).  This means that the
remaining £108.701 million, or 87% of expenditure, is projected to be
incurred by the end of the financial year, with only 69% of the financial
year remaining. 
The expenditure forecasts are based on the latest assessment of project
expenditure by service leads and project managers.  The risk in these
forecasts is that expenditure is materially less than forecast, with overly
optimistic forecasts from service leads and project managers resulting in
underspends within the current financial year and/or rephasing from
2026/27 back to 2027/28. 
The actual outturn position will be presented as part of the General
Services Capital Plan – Outturn 2026/27 report to Council in June 2027,
with prior reporting, challenge and assessment at Capital Plan & Asset
Management Board. 
1 With new projects added Page 75 of 260

Page 76

4.3 Funding 
The funding available to finance the Capital Plan in 2026/27 is expected
to total £31.627 million, £0.615 more than the rephased budget, which
reflects additional General Capital Grant funding of £0.619m less £0.004
million of unapplied developer contributions as a result of the project
expenditure underspend for the Mauricewood Road Bus Shelter project
listed in section 3.2.  Funding of £6.523 million has been received to 19
July 2026. 
4.4 Borrowing 
The budgeted level of borrowing for 2026/27 is £93.763 million.  Based
on the forecast expenditure and funding levels as noted above, the
revised estimate of the level of borrowing required for 2026/27 is
forecast to be £93.136 million, reflecting the variances in expenditure
and funding as noted in Sections 4.2 and 4.3.  The impact on the
Council’s borrowing costs is reflected in the Financial Monitoring
2026/27 General Fund Revenue report elsewhere on today’s agenda. 
5 Capital Fund 
The Capital Fund at the start of the 2026/27 financial year was £18.333
million.  £7.694 million of this is committed to fund the A701 City Deal
project, with a further £7.061 million committed to support capital
investment, and a further £0.604 million of developer contributions
earmarked to fund specific projects. 
The forecast non-committed capital fund balance at 31 March 2027 is
£3.514 million, as shown in the table below. 
Item Amount
£000’s
Balance at 01 April 2024 18,333
Forecast Capital Receipts 2026/27 540
Forecast Balance at 31 March 2027 18,873
Committed to fund City Deal Project -7,694
Committed to support Capital Investment -7,061
Developer Contributions earmarked for specific purposes -604
Forecast uncommitted balance at 31 March 2027 3,514  
Page 76 of 260

Page 77

6. Report Implications 
6.1 Resource 
The borrowing required to finance the planned investment in 2026/27 is
reflected in the Financial Monitoring 2026/27 – General Fund Revenue
report elsewhere on today’s agenda. 
6.2 Digital 
There are no Digital Services implications arising from this report. 
6.3 Risk 
The construction materials supply chain has already been subject to
unprecedented disruption through a combination of the Coronavirus
(COVID-19) Pandemic, the UK leaving the European Union, the conflict
in Ukraine and the global inflationary picture.  The Construction
Leadership Council (CLC) continues to report shortages of construction
materials and forecasts this disruption to continue for the foreseeable
future.  Ongoing engagement with suppliers confirms that materials
shortages, longer lead times and steep price increases are highly likely
to continue to impact the supply chain. 
This potentially exacerbates the inherent risk in the Capital Plan that
projects will cost more than estimated thus resulting in additional
borrowing, or will be subject to delay as project scope is reduced and
value engineering is required to deliver to available budget and mitigate
the impact on the Medium Term Financial Strategy. 
Strengthened financial monitoring & governance procedures have been
approved by CP&AMB, which will ensure that significant variations can
be captured and reported to Programme Boards and CP&AMB so that
remedial action can be taken to mitigate the risks. 
In developing the strategy and taking cognisance of the longer term
affordability gap it is clear that a number of potential projects which are
currently included, will only be able to progress if they can be delivered
on a spend to save basis (i.e. where income or cost savings more than
offset the cost of funding the investment) or where they can be delivered
on a cost neutral basis or through alternative funding mechanisms. 
The Capital Plan includes a provision for the return of contingencies of
£10.220 million over the period 2026/27 to 2029/30, equating to 2.5% of
all project expenditure.  This includes a provision for the return of
contingencies of £1.253 million in 2026/27.  The risk is that projects
throughout the plan are unable to deliver this which could be in part due
to factors outwith the Council’s control.  Capital Plan & Asset
Management Board will review the level of return of contingencies
against the £10.220 million provision on an ongoing basis to ensure that
projects can, where possible, deliver against this provision and that the
provision continues to be appropriate. 
Page 77 of 260

Page 78

6.4 Ensuring Equalities 
There are no equalities issues arising directly from this report. 
6.5 Additional Report Implications 
See Appendix A. 
Page 78 of 260

Page 79

Appendix A: Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable. 
A.2 Key Drivers for Change 
A.3 Key Delivery Streams 
Themes addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The report does not directly impact on Delivering Best Value. 
A.5 Involving Communities and Other Stakeholders 
No external consultation has taken place on this report. 
A.6 Impact on Performance and Outcome 
There are no issues arising directly from this report. 
A.7 Adopting a Preventative Approach 
Not applicable. 
A.8 Supporting Sustainable Development 
Not applicable. 
Background Papers:
Appendix 1 – GSCP 2026/27 – Quarter 1 Monitoring
Appendix 2 – Projects in Development 
Page 79 of 260

Page 80

Appendix 1: GSCP 2026/27 – Quarter 1 Monitoring 
Rephased
2026/27 2026/27 2026/27 2026/27 2026/27 2026/27 Note/
GENERAL SERVICES CAPITAL PLAN Budget Budget Actual Forecast Variance Carry Explanation
P4 Monitoring Q1 to P4 Outturn Q1 Q1 Forward Q1 for
£'000 £000's £000's £000's £000's £000's Variance/Carry Forward
CHILDREN, YOUNG PEOPLE & ESTATES PROGRAMME BOARD
Education - Primary
Woodburn Primary Extension 135 135 12 135 - -
Easthouses Primary School 292 292 0 295 3 -
Project complete and final retention released to
contractor.  Minor overspend of £0.003 million
against original £22.044 million project budget
Mayfield Learning Campus 28,054 24,742 7,005 24,742 - 3,312
Current delay of c. 3 weeks in project
programme with corresponding rephasing
of project expenditure
Bilston Primary School Extension 2,502 2,502 1,574 2,502 - -
Roslin Primary School Modular Units 55 55 7 55 - -
Mauricewood Primary School - Extension 4,181 4,181 2 4,181 - -
Education - Secondary
Beeslack CHS Replacement 10,653 2,415 72 2,415 - 8,238
Requirement to commence a new procurement
process following the approved revision of
scope of the project in May 2026 along with a
further period of RIBA Stage 2 design has
impacted the overall project programme by
approximately 8 months, resulting in rephasing
of project expenditure
Penicuik High School 9,219 21,772 2,921 21,772 - (12,553)
The project is progressing well and is currently
ahead of programme, resulting in expenditure
being ahead of the original planning
assumptions. Consequently, forecast spend has
been rephased from future financial years into
2026/27 to align with the contractor's delivery
programme and current progress on site. The
revised profile therefore represents a more
accurate assessment of expenditure timing and
does not indicate an increase in the total
approved project cost.
Shawfair All-through Campus 21,616 19,910 1,021 19,910 - 1,706
Project planning application is now due to be
determined in late October 2026 rather than the
projected early September 2026. In addition,
whilst the market testing exercise underway by
the main contractor is progressing, the
review/cleansing of those packages is taking
longer than anticipated due to a number of
issues. A 2026 start on site is still expected,
with first works concentrating on enabling works
following the successful completion of
remediation works carried out by Shawfair LLP.
Education - ASN
ASN Provision - Social Complex Needs 42 42 3 42 - -
Education - Early Years
Mount Esk Nursery Replacement @ Hawthornden 1,263 1,263 - 1,263 - -
Vogrie Outdoor Early Learning Centre 105 105 12 105 - -
Education - General
Acoustic Upgrades 87 87 42 87 - -
Learning Estate Strategy: Development Budget 361 361 - 361 - -
TOTAL - CHILDREN, YOUNG PEOPLE & ESTATES PROGRAMME BOARD78,565 77,863 12,672 77,866 3 702
Page 80 of 260

Page 81

Rephased
2026/27 2026/27 2026/27 2026/27 2026/27 2026/27 Note/
GENERAL SERVICES CAPITAL PLAN Budget Budget Actual Forecast Variance Carry Explanation
P4 Monitoring Q1 to P4 Outturn Q1 Q1 Forward Q1 for
£'000 £000's £000's £000's £000's £000's Variance/Carry Forward
ASSET MANAGEMENT PROGRAMME BOARD
Digital
Business Applications 140 140 - 140 - -
Front Office - Hardware, Software  & Services 334 334 (5) 334 - -
Back Office - Hardware, Software & Services 131 131 - 131 - -
Network, Software & Services 735 735 - 735 - -
Schools - Hardware, Software  & Services 292 292 - 292 - -
Recharge of Staffing 329 329 - 329 - -
Digital: Equipped for Learning Phase 1 300 300 1 300 - -
Digital: Equipped for Learning Phase 2 451 451 - 451 - -
Roads & Street Lighting
Street Lighting and Traffic Signal Upgrades - New 880 880 16 880 - -
Footway & Footpath Asset Management Plan - New 674 674 - 674 - -
Road Upgrades - Asset Management Plan 1,984 1,984 59 1,984 - -
Roads: Resurface Residential Schemes 3,183 3,183 247 3,183 - -
Roads Asset Management Plan - Temple Ground Stabilisation309 309 - 309 - -
Fleet
Vehicle & Plant Replacement Programme 4,277 4,277 248 4,277 - -
Property
Property Upgrades 5,356 5,356 167 5,356 - -
Property Upgrades - LES 144 144 23 144 - -
Robotic Scrubber Driers 53 53 - 53 - -
Open Spaces / Play Areas
Mauricewood Road Bus Shelter 4 4 - - (4) -
Installation of bus shelter in prior years and
project fully complete, with underspend of
£0.004 million against capital expenditure
budget
Welfare Park, Newtongrange 39 39 - 39 - -
Play Park Renewal 2023/24+ - - - - - -
Play Park Renewal 2024/25 476 476 29 476 - -
Play Park Renewal 2025/26 495 495 - 495 - -
Callander Park Play Equipment 50 50 3 50 - -
Nature Restoration Fund 2023/24 4 4 - 4 - -
Contaminated Land 70 70 30 70 - -
Public Sector Housing Grants 291 291 214 291 - -
Sport & Lesiure
Bonnyrigg Rose Football Club: Engineering & Ground Works13 13 - 13 - -
Adult Social Care
Assistive Technology 485 150 17 150 - 335
TOTAL - ASSET MANAGEMENT PROGRAMME BOARD21,500 21,165 1,048 21,160 (4) 335
Page 81 of 260

Page 82

Rephased
2026/27 2026/27 2026/27 2026/27 2026/27 2026/27 Note/
GENERAL SERVICES CAPITAL PLAN Budget Budget Actual Forecast Variance Carry Explanation
P4 Monitoring Q1 to P4 Outturn Q1 Q1 Forward Q1 for
£'000 £000's £000's £000's £000's £000's Variance/Carry Forward
TRANSPORT, ENERGY & INFRASTRUCTURE PROGRAMME BOARD
Transport
A701 Relief Road: Bush Loan Junction 5,554 5,554 10 5,554 - -
A701 Relief Road: A701 Active Travel Corridor 1,569 1,569 9 1,569 - -
Sustainable Transport
A7 Urbanisation 213 213 130 213 - -
Active Travel Infrastructure: Tier 1 1,048 1,048 120 1,048 - -
Active Travel Infrastructure: Tier 2 369 369 - 369 - -
Bus Infrastructure Fund: Tier 1 221 221 - 221 - -
Community Bus Fund 4 4 - - (4) -
Installation of Bus Trackers installed in prior
years and project fully complete, with
underspend of £0.004 million against capital
expenditure budget
Road Safety Improvement Fund 246 246 0 246 - -
People & Places Projects - LADA Funded 37 37 - 37 - -
Others
FCC Zero Waste - Heat Offtake Facility 2,400 2,400 - 2,400 - -
TOTAL - TRANSPORT, ENERGY & INFRASTRUCTURE PROGRAMME BOARD11,660 11,660 269 11,656 (4) -
REGENERATION & DEVELOPMENT PROGRAMME BOARD
Regeneration
Place Based Investment Fund 2021/22 4 4 3 4 - -
Place Based Investment Fund 2022/23 36 36 0 36 - -
Place Based Investment Fund 2023/24 118 118 - 118 - -
Place Based Investment Fund 2025/26 201 201 - 201 - -
Rosewell Development Trust - The Steading Infrastructure Upgrades110 110 - 110 - -
Penicuik THI: Public Realm Scheme 98 98 42 98 - -
Development - - -
Destination Hillend 1,944 1,944 551 1,944 - -
Midlothian House RetroFit 8,576 8,576 1,004 8,576 - -
Midlothian Life Care Facility 746 746 326 746 - -
Day Care Centre 116 116 81 116 - -
General Fund Share of Extra Care Housing 25 25 6 25 - -
Enhancing Midlothian's Residential Care Capacity 2,115 2,115 - 2,115 - -
Gorebridge Hub: Relocation of Library to Leisure Centre 485 485 9 485 - -
Recycling Improvement Fund (Stobhill Recycling Depot) 226 226 2 226 - -
TOTAL - REGENERATION & DEVELOPMENT PROGRAMME BOARD14,801 14,801 2,024 14,801 - -
OTHER (PROGRAMME BOARD NOT YET DEFINED)
PLACE
Property/Development
Midlothian & Fairfield House Shower Upgrades 2 2 - 2 - -
Millerhill Pavilion 7 7 - - (7) - Demolition complete with minor project
underspend of £0.007 million
PEOPLE & PARTNERSHIPS -
Education -
Free School Meal Provision 186 186 - 186 - -
Communities & Partnerships -
Members Environmental Improvements 344 344 49 344 - -
TOTAL NOT ALLOCATED TO PROGRAMME BOARDS540 540 49 533 (7) -
SUBTOTAL - PRE RETURN OF CONTINGENCIES127,066 126,029 16,062 126,017 (12) 1,038
Provision for Return of Contingencies (1,253) (1,253) - (1,253) - -
-
GENERAL SERVICES CAPITAL PLAN TOTAL 125,813 124,775 16,062 124,763 (12) 1,038
Page 82 of 260

Page 83

Appendix 2 – Projects Under Consideration 
The General Services Capital Plan (GSCP) includes all projects that are currently fully approved
or approved in principle. 
In addition, the following projects are being considered; and will be brought forward to Council
for full approval and adoption in the GSCP if the project meets the Council’s statutory & policy
drivers and an affordable business case has been developed. 
The following list is not an exhaustive list of projects but represents a wider suite of projects to
those already approved. 
Projects Under Consideration 
Children, Young People and Partnerships Programme Board
Gorebridge High School
Lasswade High School – Enhancement of Core & Community Capacity
Conversion of Mount Esk Nursery School to ASN provision (for Lasswade High School)
St. David’s Primary Extension 
Asset Management Board
Temple Ground Stabilisation
B6372 Arniston Embankment Stabilisation 
Regeneration & Development Programme Board
Stobhill Depot Masterplan
Woodburn Community Hub
Vogrie Renewal Strategy Masterplan
Gorebridge Library Relocation 
Transport, Energy & Infrastructure Programme Board
A701 Relief Road – Phases 4-8 
Page 83 of 260

Page 84

Page 84 of 260

Page 85

Midlothian Council
Tuesday 22 September 2026
Item No 8.4 
Housing and Building Maintenance Update 2026 
Report by Kevin Anderson, Executive Director Place 
Report for Noting 
1  Recommendations 
It is recommended that Council notes: 
i. The ongoing development and delivery of Midlothian Council’s
affordable housing programme.
ii. Progress with service review for Housing Service and Building
Maintenance Service. 
iii. Ongoing investment in digitally enabling Housing Services and
Building Maintenance Services to enhance customer experience
and performance. 
2 Purpose of Report 
2.1 To update the Council on the status of Midlothian Council’s affordable
housing programme in 2025/2026 on approved sites and proposed
new sites for the Council new build affordable housing programme
and other initiatives, and highlight progress made on the respective
investment in service teams and digital infrastructure. 
Date: 28 August 2026
Report Contact: Fiona Clandillon, Head of Development
fiona.clandillon@midlothian.gov.uk 
Page 85 of 260

Page 86

3 Background 
3.1 The Scottish Government’s housebuilding statistics published on 30th
June 2026 reveal a picture of housebuilding decline across Scotland.
3.2 In 2025-26, there were 17,268 new-build completions in Scotland,
1,914 fewer (-10%) than in the same period a year ago. Within this
period, private sector completions fell from 14,711 to 13,494 (-8%). The
number of new-build starts was 14,955, an annual fall of 4.4%. Over
the same period, private sector starts fell from 12,501 to 11,018 (-12%).
3.3 Statistics for the social housing sector in 2025-26 reveal that
completions also fell but at a steeper rate from 4,471 to 3,774 (-16%),
however, starts in the social sector increased from 3,147 to 3,937,
which is an annual increase of 25%. 
Figure 1: New-build completions by sector: Scotland (2025-26) 
3.4 It is important to note that the number of homes being constructed in
Scotland across all tenures is in decline and is combined with reduced
industry capacity to deliver new homes in the future.
3.5 In contrast, housebuilding in the wider Edinburgh and South East
Scotland city region has been sustained and Midlothian has the highest
level of housebuilding per 10,000 of population in Scotland.
3.6 In the Midlothian Council area, the total new housing supply is in
contrast to the national figures for 2025-26. The total number of
construction starts for Scotland was 14,955, the average per local
authority area is 467 new homes starts, while in Midlothian this figure is
well above the national average at 598 new homes construction starts.
3.7 This growth in housebuilding has resulted in a corresponding growth in
the delivery of affordable homes in Midlothian. 
Page 86 of 260

Page 87

Figure 2: All housing completions in Scotland, per 10,000 of population 
Page 87 of 260

Page 88

4 Affordable Housing Delivery 
4.1 On 25th March 2026, the Cabinet Secretary for Housing has confirmed
£2.939 billion Resource Planning Assumptions (RPA) for the next four
years to 2029-30, representing an increase of more than £486 million
when compared to the last four years. For Midlothian Council, the
housing programme budget/Resource Planning Assumptions (RPAs)
allocation over the next four years is as follows: 
Table 1 Four Year RPA Midlothian 
Year Amount (£m)
2026-27 10.586
2027-28 10.904
2028-29 11.231
2029-30  11.568
Total 44.288 
4.2 In addition to the four-year RPA funding confirmation, the Scottish
Government’s More Homes Division updated the affordable housing
investment benchmarks with immediate effect on 19th March 2026.
These replace the benchmarks introduced in October 2024 which have
been reviewed using data from the Scottish Social Housing Tender
Price Index covering the full 2024 calendar year. This has led to a 4.6%
increase across all benchmarks – except for the benchmark related to
zero direct emissions heating systems, which has been increased by
approximately 24.7%. Information provided by councils, Registered
Social Landlords (RSLs), and their respective arms-length external
organisations and subsidiaries shows that the average cost of installing
a zero direct emissions heating system in 2024-25 was £12,002 per
home (at the three-person equivalent level). Using management
information which shows an average grant support level of 51% for
these organisations in 2024-25, the new grant amount has been set for
the updated benchmark for these installations at £6,121 per home (at
the three-person equivalent level). 
Table 2 Benchmark Adjustment
Provider &
Tenure Type
October 2024
Benchmark
March 2026
Benchmark
Increase
(£)
%
Increase
RSL Social
Rent £95,741 £100,145 +£4,404 4.60%
Council Social
Rent £87,763 £91,800 +£4,037 4.60% 
Page 88 of 260

Page 89

4.3 Midlothian continues to experience exceptional housebuilding growth.
This expansion, combined with economic pressures, including high
inflation, labour shortages, supply chain disruptions, and the cost-of-
living crisis, has placed unprecedented pressure on the Council's
affordable housing delivery program. 
4.4 Despite this challenging operating environment, Midlothian Council's
strategic approach has successfully mitigated these risks. A notable
outcome of this proactive programme management was securing an
additional £2.139m of Scottish Government grant funding in 2025/26.
This supplementary allocation was successfully captured from unspent
capital redistributed from other local authorities, directly reflecting the
strength and readiness of Midlothian's affordable housing programme.
4.5 The Scottish Government published its Housing Emergency Action
Plan on 2nd September 2025, building upon the national housing
emergency declared in May 2024. This overarching national
intervention establishes clear operational milestones focused on three
core objectives:
• Ending children living in unsuitable accommodation: Driving forward
the national mission to eliminate child poverty by removing families
from temporary housing like B&Bs and hotels.
• Supporting vulnerable groups: Addressing the distinct needs of
vulnerable communities, including a national "fund to leave" for
survivors of domestic abuse.
• Growing and investing in the housing sector: Maximising long-term
private and public infrastructure investment while accelerating the
planning system.
Specific National Actions and Targets
• Affordable Housing Supply: The plan commits to the delivery of
36,000 all-tenure affordable units over the next four years of which
25,000 will be social rent homes by 2029/30.
• Funding Package: A £4.9 billion investment package has been
deployed over a four-year period to support delivery and double
funding for local housing acquisitions.
4.6  For Midlothian Council, this national framework shapes local strategic
delivery. In direct response to these national priorities and funding
mechanisms, the Council formally approved and adopted its Local
Housing Strategy (LHS) 2026/27 – 2030/31 on 31st March 2026. This
newly implemented strategy embeds the Scottish Government’s
funding distribution models to scale up the Council’s Strategic Housing
Investment Plan (SHIP). By successfully aligning national resources
with local infrastructure capacity, Midlothian Council is positioning its
Affordable Housing Programme to maximise investment opportunities,
expand high-quality social rent developments, and effectively meet the
needs of the area's fast-growing communities. 
Page 89 of 260

Page 90

5 Housing Revenue Account Financial Model
5.1 For many years the Council have operated a 15-year rolling financial
model which has provided the strategic financial backdrop to capital
investment and rent levels. The model is refreshed on an annual basis,
or more regularly if there are materially changing circumstances.
5.2 Financial projections are based on a combination of known events (e.g.
agreed rent increase) and modelling assumptions. The main
assumptions are:
• Inflationary increases using published statistics.
• Rental income streams based on agreed or estimated increase
in annual rents. Currently a rental increase of 5.42% to the end
of financial year 2028/29 is approved with a planning
assumption of 4.8% thereafter to 2031/32 and 2.9% thereafter.
• Borrowing costs from capital expenditure incurred or approved
through to the end of phase 5 of the new build programme with
continuing investment to meet Scottish Housing Quality
Standards (SHQS), Energy Efficiency in Scottish Social Housing
(EESSH) and Damp Remediation works.
• Rent levels for new build properties will converge with those for
existing stock 15 years from handover.
• External funding via Scottish Government schemes.
5.3 The model forecasts a gradually eroding HRA reserve from its current
projected balance of £28 million in 2026/27 to £2 million in 2040/41. 
5.4 Midlothian Council approved an annual rent increase of 5.42% effective
1st April 2026. This strategy covers a three-year period from 2026/27 to
2028/29. The increase will fund ongoing maintenance, meet national
energy efficiency standards, and support the construction of new
affordable council homes. The rent strategy was finalised and agreed
upon by the council in February 2026 following extensive public
consultation with local residents, paper surveys, and tenant focus
groups.
Key initiatives and focus areas of the 2026 strategy include:
• Energy Efficiency: Ensuring compliance with the Energy Efficiency
Standard for Social Housing (EESSH2) to reduce fuel poverty.
• Housing Upgrades: Continuing upgrades to maintain and improve
existing Council properties in line with the Scottish Housing Quality
Standard (SHQS).
• New Builds: Funding the Strategic Housing Investment Plan (SHIP),
which includes 300 new Council social rent homes in Midlothian.  
Page 90 of 260

Page 91

6 Affordable Housing Delivery
6.1 The risk that the Phases 5 and 6 New Social Housing Programme in
Midlothian will become unaffordable has been substantially mitigated
by the confirmation of a four-year funding package totalling £44.288
million spanning 2026-27 to 2029-30. This allocation provides £10.586
million in 2026-27, £10.904 million in 2027-28, £11.231 million in 2028-
29, and £11.568 million in 2029-30 as detailed in paragraph 4.1 above.
6.2 This multi-year baseline is supported by the Scottish Government’s
announcement allowing project approvals against future allocations at
declining risk-mitigation rates (80% for 2026/27, 60% for 2027/28, and
40% from 2028/29). While this framework significantly removes long-
term funding uncertainty, a localised element of forward funding
remains necessary for specific Phase 5 and 6 sites. Financial modelling
confirms that the Housing Revenue Account (HRA) can successfully
support these forward funding requirements up to 2027/28 (see Table
2).
6.3 In recent times, the construction industry in Scotland and across the
UK has faced highly volatile market conditions, resulting in significant
increases in tender prices for a wide range of materials. While previous
evidence suggested severe inflation spikes of 10–15% above standard
forecasts, current data from the Building Cost Information Service
(BCIS) indicates a stabilising but upward trend, with the All-In Tender
Price Index (TPI) projected to increase by 3.2% year-on-year. While
measures such as value engineering are helping to partially offset
accumulated historical cost pressures, there remains a persistent risk
that the capital budgets allocated for delivery of the New Social
Housing programme may require uplift, with consequent implications
for the overall funding strategy.
6.4 The Council continues to achieve best value through robust
procurement processes and successfully manages the transition into a
more stabilised 3.2% inflationary environment. Consistent high tender
responses from a healthy range of contractors validate this approach,
maximising capital efficiency across the Phase 5 and 6 delivery
timelines.  
Page 91 of 260

Page 92

7 Strategic Local Programme Agreement 2025/26
7.1 The Strategic Local Programme Agreement (SLPA) for this Financial
Year has been confirmed at £10.586m for Midlothian’s Affordable
Housing Supply Programme (AHSP) grant allocation.
7.2 Sites that will draw down on Scottish Government funding this year are
included in Table 1 below.            
Table 3 2026/27-2027/28 Affordable Housing Delivery Funding Drawdown 
Site Developer Number Tenure ASHP
Grant
Funding
Auchendinny Phase 2 (MLC Ph1) -
P43835
Midlothian
Council
25 Social
rent
2.361
Bonnyrigg, Dalhousie Phase 2B -
P47190
Wheatley
Group
24 Market
rent
2.160
Mayfield, Oakwood Edge Phase 2
- P40161
Melville HA 28 Market
rent
0.694
Millerhill, Old Craighall Road
(Barratt) - P41759
Midlothian
Council
30 Social
rent
3.200
Newtongrange, Main Street -
P43742
(Former Swimming Pool and
Church Halls)
Midlothian
Council
23 Social
rent 
0.941 
Open Market Purchases 2026-27 -
P41760
Midlothian
Council
10 Social
rent 
0.550
Shawfair Block 'P' - P43738 Midlothian
Council
38 Social
rent 
1.750
Shawfair Block 'W2' (Woolmet)
Phase 1 - P48667
Wheatley
Group
10 Social
rent 
0.000
(£1.289m
charitable
bonds
funding
authorised)
Shawfair Blocks 'R1'/'R2' - P43739 Midlothian
Council
35 Social
rent 
2.076
Total   223   11.732 
7.3 The Affordable Housing Supply Programme (AHSP) currently projects
a grant over commitment of £1.146m for the current financial year. This
will be mitigated through two primary strategic mechanisms:
• Slippage Alignment: Offsetting the variance against projected
project slippage, reallocating funds from schemes whose site
commencement dates have shifted beyond the current financial
year.
• Additional Grant Funding: Targeting surplus Scottish Government
grant allocations redistributed from under-spending local authorities,
replicating the successful funding strategy achieved in the 2025/26
financial year.
Page 92 of 260

Page 93

8 Phase 5 and 6 Funding
8.2 The confirmed four-year grant funding settlement allows Midlothian
Council to transition from reactive site deferrals following grant cuts in
2024/25 to a structured, multi-phase delivery model. By locking in these
precise allocations, the Council minimises funding volatility and can
confidently align both its Revised Phase 5 completions and Phase 6
pipeline planning with the Local Housing Strategy (LHS) 2026/27 –
2030/31. The active delivery pipelines are structured as follows:
• Revised Phase 5: Consists of finalised local priority developments
and Section 75 acquisitions targeted for completion through 2027
(detailed in the table below).
• Phase 6 Pipeline: Backed by a £97million capital allocation, this
phase focuses on the next generation of social housing delivery via
the Strategic Housing Investment Plan (SHIP), scheduling
unapproved council sites to align with future funding releases. 
8.3 In addition to Phase 5 and 6 funding, the stabilisation of the core RPA
funding directly protects the £20 million capital budget earmarked for
Housing-Led Town Centre Regeneration. Because core housing
delivery is now insulated by the £44.289 million RPA settlement, the
regeneration fund can remain exclusively dedicated to its primary
objective. Feasibility and design frameworks are progressing into active
planning phases within Dalkeith Town Centre, seamlessly combining
urban renewal with high-density, energy-efficient social housing.
Page 93 of 260

Page 94

Table 4 – Phase 5 and 6 MLC Housing Programme Update 
Phase 5 Sites Update
Site Units Status
Site 148 - Newton Church Road Leisure Centre
and Pool Sites (MLC)
23 Smaller site, Council owned. Grant approval confirmed in SLPA 24/25
and due to complete at the end of September 2026
Site 153 - Newtongrange Church Hall and
Swimming Pool Site (MLC)
23 Not on site, however grant allocated in form of site acquisition.
Planning applications have been submitted in March 2026 and a
planning decision expected by end of Aug 2026.
Plot P, Shawfair (Lovell) 38 Developer due to target site start in 2026/27.
The Brae Auchendinny (Bellway) 75 SG Grant funding has been approved which is phased over 3 years to
manage grant allocation. 
Wellington Farm (Barratt Homes), Old Craighall
Millerhill
30 Developer due to target site start in 2026/27.
Cruden Shawfair R1/R2 Site 35 Developer due to target site start in 2026/27.
Robertsons Shawfair S5 14 Developer due to target site start in spring 2027.
Total 266 
Phase 6 Sites Update 
Site Units Status
Rullion Road, Penicuik (MLC) 46 No grant allocation approved, has received forward funding for site
acquisition. Planning application submitted in March 2026. Moved to
phase 6 to balance HRA funding and project delivery.
Lingerwood (Barratt) 113 MLC to determine timing / phasing / costs and potential grant
approval timing.
Cauldcoats (PFP) 50 MLC to determine timing / phasing / costs and potential grant
approval timing.
Page 94 of 260

Page 95

Blackcot Drive, Mayfield 45 MLC owned site which will be taken forward for a social rent housing
development subject LDP 2 approval. 
Bogwood Road, Mayfield 40 MLC owned site which will be taken forward for a social rent housing
development subject LDP 2 approval.
Old Craighall Road, Shawfair (Mactaggart and
Mickel) (Bellway)
48 MLC to determine timing / phasing / costs and potential grant
approval timing.
Total 342 
Page 95 of 260

Page 96

9 Ongoing Delivery
9.1 Midlothian Council's housing programme is delivering 159 new home
handovers across key sites in 2026/27, including Morris Road, 
Newbattle Phase 1 where 90 new homes were completed in May 2026,
Newbyres Crescent which completed 75 new homes in July 2026,
Dundas Shawfair (28), and Newton Church Road (23). 
Table 5 – MLC Housing Programme Update 2026/27 Completions 
Site Name
Apr-26
May-26
Jun-26
Jul-26
Aug-26
Sep-26
Oct-26
Nov-26
Totals
Newbyres Crescent   36 8 31         75
Newbattle Phase 1 21 12             33
Dundas Shawfair, Danderhall   8 8 12         28
Newton Church Road, Danderhall            23     23
Total Handovers 
Nov 25 to Nov 26 21 56 16 43 0 23 0 0 159 
Former Newbattle High School, Morris Road, Easthouses 
Page 96 of 260

Page 97

Intermediate Care and Extra Care Housing, Polton St Bonnyrigg 
Newbyres, Gorebridge
Page 97 of 260

Page 98

S75 Homes, Dundas Building, Edmonstone Road, Shawfair 
Table 6 – Annual Delivery Over Time 
Year of
completion
No. of completed
Council units
2006 0 
2007 28 
2008 172 
2009 237 
2010 88 
2011 160 
2012 170 
2013 76 
2014 0 
2015 48 
2016 41 
2017 87 
2018 0 
2019 10 
2020 31 
2021 90 
2022 122 
2023 243 
2024 111 
2025 91 
Total 1805 
Page 98 of 260

Page 99

10 Energy Efficiency Standard for Social Housing (EESSH2) 
10.1 In addition, the programme of upgrades to the Council’s existing
housing stock to enhance energy efficiency has advanced. In 2025/26,
energy efficiency measures were installed to 452 properties – 305
Council, 145 owner occupied and 2 privately rented homes. A range of
measures were installed, with the main focus on external wall insulation
(213 homes), solar panels with battery storage (368 homes), as well as
air source heat pumps to 33 homes, and  mechanical ventilation & heat
recovery system (MVHR) with new windows and doors to 24 homes.
The main areas in Midlothian which saw a benefit from these measures
were Bilston, Bonnyrigg, Dalkeith, Pathhead, Penicuik and Rosewell. 
10.2 In the 2025/26 Social Housing Net Zero Housing Fund (SHNZHF)
programme, there was a spend of £592k in capital expenditure and
£348k grant claimed via the Scottish Government. 
10.3 The Energy Efficiency Scotland: Area Based Scheme (EESABS)
2025/26 programme saw a 100% spend of grant received, with £1.69m
funding claimed – £1.1m of core funding with an additional £500k
awarded by the Scottish Government. There was approximately £4.7m
of capital spend alongside this to Council homes. 
10.4 In 2026/27 there are planned continuation projects in Cuikenburn
(Penicuik), Auchendinny, Bilston, Pathhead, and Bonnyrigg, which will
see external wall insulation and solar panels with battery storage
installed at 238 properties. The next SHZNHF project is planned for
delivery to 50 Council homes around Cameron Crescent in Bonnyrigg,
offering an air source heat pump alongside solar panels with battery
storage. A feasibility study will be carried out to Eskdaill Court in
Dalkeith, assessing suitability for various energy efficiency and upgrade
measures. In Roslin, there are planned upgrades to 48 Council and 5
privately owned properties. Finally, a long-term retrofit project will begin
in Mayfield & Woodburn with the aim of carrying out energy efficiency
measures over a multiple year period. 
11 Investment in Workforce
11.1 A Service Review for the Housing Service has been completed and
approved by the Corporate Management Team. Consultation and
implementation processes are now underway. The current proposal will
see the creation of a number of new posts to support the service, with
the focus on expanding administrative and partnership and compliance
roles, to support and enable Housing, Homelessness and Temporary
Accommodation Officers to focus on their customer facing work. New
roles include:
• Senior Manager of Housing and Building Maintenance Service
• Housing Performance Manager
• Housing Assistant team and Supervisor 
Page 99 of 260

Page 100

11.2 The overall ratio of dedicated housing officers plus support officers will
move from 10 FTE to 15.1 FTE (10.5FTE + 4.6FTE) or 1 FTE per 567
homes, once housing stock reaches its post Phase 6 level of 8564
homes.   
Table 7 Cost of Proposed Structure  
Cost of New
Structure
26/27 Budget Funding
Required
HRA 1,123,717  816,082 307,635
Homelessness 333,113 373,686 (40,573)
RRTP(Homelessness) 69,217 0 69,217
Service Charge 308,068 249,695 58,373
Totals 1,834,115 1,439,463 394,652 
11.3 A Service Review of the Building Maintenance Service, which
maintains the Council’s housing stock, is also progressing.  
Impact on Rents 
11.4 Assuming the mainstreaming of Rapid Rehousing Transition Plan
(RRTP) (Homelessness Officer) posts currently funded externally, the
additional cost of £307,635 for the Housing Service will be recharged to
the Housing Revenue Account (HRA) as part of the recharging
mechanism between the General Fund and the Housing Revenue
Account that is currently in place. Rents would need to increase by an
additional 0.11% per annum (from 2029/30) to support the additional
cost of £307,635 for the restructure. 
11.5 Future years projections are currently sitting at 4.8% increase 2029/30-
2031/32 and 2.9% thereafter therefore these would need to increase to
4.91% and 3.01% to support the restructure. At next rent review
2029/30-2031/32, rental levels will take into account these additional
service improvements to the HRA, with current HRA reserve levels
covering the additional cost in the meantime. 
Impact on General Fund 
11.6 Homelessness and homelessness prevention are costs that are met
from the general fund, as current guidance does not allow these costs
to be met from the HRA.  The restructure is projecting a saving to the
homelessness service of £40,573, however if it is decided to
mainstream the RRTP posts (working assumption), which currently
costs £69,217, this would negate the saving and additional resources
would be required of £28,644 per annum. 
Page 100 of 260

Page 101

11.7 The additional cost of £58,373 to support additional temporary
accommodation resourcing requirements will be recovered through
service charge income so would have no impact on the general fund. 
12  Digital Investment 
Tenants Portal – Housing Services 
12.1 ONE Housing is the main digital portal for the housing service, which
contains a database of all tenants. 
12.2 From Summer 2026, the Council will be implementing a new module
onto the ONE Housing database called Tenants’ Portal.  This tenant’s
portal will provide Midlothian Council tenants with a digital platform for
housing services for the first time. This portal will allow tenants to apply
for Council homes through an online application form, check the
progress of their application and manage location preferences and
update change of circumstances. The portal will also collect tenants’
data electronically, ensuring there is an up to date contact database,
which will assist housing processes significantly. Once that is achieved,
Housing Services is seeking to bring additional functionality into the
online portal, such as channelling communications from tenants
through the portal, reducing email traffic and contact via phone.   
12.3 The proposed new Housing Assistants roles will provide first time
response assistance to help tenants access housing services, make
service requests and follow up on delivery to these requests. This will
allow housing officers to focus on delivery of housing services, offer
guidance on registration and navigation and ensuring any early issues
are addressed promptly.  As a more digitally enabled service is
delivered, they will continue to provide a first point of contact for
tenants and help build tenant confidence in using a digital platform.   
12.4 Further digital enablement is required to remove labour generating
paper processes from the housing service. Equipping officers with
mobile technology such as tablets is essential for fostering a more
proactive, visible customer focused service delivery.  This will support
the need for enhanced engagement while driving operational efficiency. 
By enabling the team to work in an agile manner and remotely in
homes eliminates duplication on taking paper notes in the home and
then updating when in the office.  It will also support potential data loss
in the handwritten notes, driving improved customer service. 
Furthermore, as more functionality moves from paper based processes
to electronic, this will provide more real time data on how the service is
performing; enabling managers to direct resources in the most efficient
way to better serve our tenants. 
Page 101 of 260

Page 102

Total Connect – Building Maintenance Services
12.5 The Building Maintenance Service is part way through the
implementation of a new software solution. The 18 month project
commenced at the end of 2025; and includes mobile working for all
staff across the domestic and non-domestic estate (planned and
reactive operatives), better quality data to manage performance and
respond quicker to requests from tenants, a self service portal for
tenants to report repairs 24/7, AI (Artificial Intelligence)overlay to
reduce the time for operatives and planners to review individual cases
and a range of back office functionality which will improve service
delivery for our tenants and reduce time consuming tasks for staff.
Implementation is in phases with full completion expected Spring 2027. 
13. Report Implications (Resource, Digital and Risk) 
13.1 Resource 
Resource implications of this report are presented in the quarterly
Housing Revenue Account updates submitted separately to Council. 
13.2 Digital 
There are no digital implications of this report. 
13.3 Risk 
There is regular review of risk to ensure the retained risk in the new
house building programme is of an acceptable and tolerable level to
maximise opportunities and have full consideration of risk implications in
achieving our aims and objectives. Risk across the affordable housing
programme is monitored, reported and managed through the Housing
Programme Board and Capital and Asset Management Board (CPAMB). 
13.4 Ensuring Equalities 
Equality is central to all housing and housing services delivery. An
Integrated Impact Assessment (IIA) has been undertaken on the Local
Housing Strategy 2026-31 to ensure that the needs of local communities
have been fully considered. The SHIP reflects identified needs and
draws on findings from the IIA when considering the implications flowing
from the translation of strategic aims into housing policies. 
13.5 Additional Report Implications (See Appendix A) 
See Appendix A
Page 102 of 260

Page 103

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Affordable housing, homelessness and health and social care outcomes
through the provision of specialist housing. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
We manage all aspects of our business so that tenants and other
customers receive services that provide value for money in the rent and
other charges they pay. 
A.5 Involving Communities and Other Stakeholders 
A full consultation in the current Rent Setting Strategy 2026/27 to
2028/29 and the Housing Allocation Policy 2024 was available to
Midlothian Council tenants and waiting list applicants. Stakeholders are
informed of outcomes at the regular Local Housing Strategy Forum
meetings as well as the public consultation that is current ongoing for the
new Local Housing Strategy for the period of 2026-2031. 
A.6 Impact on Performance and Outcomes 
Not applicable 
Page 103 of 260

Page 104

A.7 Adopting a Preventative Approach 
Not applicable 
A.8 Supporting Sustainable Development 
Good practice in relation to energy efficiency and sustainability is
contained in the SHIP and Local Housing Strategy 2026-31. Midlothian
Council has delivered the largest Passivhaus programme of affordable
housing in Scotland. 
Background Papers: N/A 
Page 104 of 260

Page 105

Midlothian Council   
Tuesday 22 September 2026
Item No 8.5 
Midlothian Strategic Housing Investment Plan 2027/28 - 2031/32 
Report by Kevin Anderson, Executive Director Place 
Report for Decision 
1 Recommendations 
i. Council is recommended to approve the Strategic Housing
Investment Plan (SHIP) 2027/28 – 2031/32, which will be
submitted to the Scottish Government on 30th October 2026 to
meet the required dateline, subject to approval by Council.
ii. Council is asked to note the commentary under Resources,
highlighting the funding constraints the Council’s affordable
housing supply programme is under and potential means to
address this. 
2 Purpose of Report/Executive Summary 
This report summarises the key points set out in Midlothian’s Strategic
Housing Investment Plan (SHIP) 2027/28 – 2031/32, which details the
priorities for investment in new affordable housing in Midlothian over
the next five years. 
Date: 21st August 2026 
Report Contact: Fiona Clandillon, Head of Development
email: fiona.clandillon@midlothian.gov.uk 
Page 105 of 260

Page 106

3 Background/Main Body of Report 
3.1 The Scottish Government requires all local authorities to prepare a
Strategic Housing Investment Plan (SHIP) that identifies the main
strategic investment priorities for affordable housing over a five-year
period. This important document is required on an annual basis as the
Scottish Government requires detail on the Affordable Housing Supply
Programme in each regional area towards meeting the national target
of supporting the development of 110,000 new affordable homes. 
3.2 Midlothian Council currently manages 7,472 social rent council homes. 
The current distribution by property size is detailed below:
1-Bedroom: 1,082 homes
2-Bedroom: 4,042 homes
3-Bedroom: 1,991 homes
4+ Bedrooms: 357 homes 
3.3 An analysis of the current housing waiting list reveals strong demand
for smaller properties, while pressure on larger family homes has
eased.
• High Demand (82% total): Smaller properties represent the vast
majority of registered needs. 1-bedroom homes account for 25%
of applicant demand, while 2-bedroom properties are the most
sought-after at 57%.
• Low Demand (18% total): Larger homes see significantly less
pressure from applicants. Only 13% of individuals on the
housing list require a 3-bedroom property, and just 5% require a
home with 4 or more bedrooms. 
3.4 The delivery of more affordable housing remains a high priority for
Midlothian Council; 864 properties were completed in phase one of the
Council’s new social housing programme; 489 in phase two; 735
expected on completion of phases three and four; and an additional
311 are funded for delivery in phase five with 300 new homes proposed
for phase 6, which is funded by the most recent rent review.
3.5 While the SHIP shows an increase in the number of lettings, in part as
a result of Midlothian Council’s continued investment in a new build
programme, the number of people on the Council’s waiting list
increased by 11% in 2026, part of an overall upward trend. The number
of households currently on the list is attributable to several nationwide
economic factors as well as increased local awareness of Midlothian
Council’s new build programme. Despite significant levels of
investment in new housing, there is still a shortage against the demand
for affordable housing in Midlothian with 6255 households now on the
Council’s Housing List. 
Page 106 of 260

Page 107

3.6 Midlothian Council has proposed 470 homes in the SHIP which are not
yet on site. Partner Registered Social Landlords (RSLs) have an
additional 629 homes listed in the SHIP which are not yet on site.
Some of these projects contain several phases of development, each
having its own prioritisation and SHIP entry.
3.7 A total of £106.6m million of Scottish Government grant funding would
be required by the Council and RSLs to deliver the identified units over
the next five years. 
3.8 The number of Midlothian Council new build properties to be built over
the course of the SHIP is 440 with an additional 30 properties bought
via the Open Market Purchase Scheme, bringing the total council
allocation to 470 new homes. The number of RSL new build properties
planned over the same period is 629. Overall, the SHIP will deliver
1099 new affordable homes to the Midlothian area. The table below
illustrates that the Midlothian Council Affordable Housing Programme
has reduced since last year’s SHIP. Mirroring this trend, the overall
SHIP numbers have also decreased by 454 units. This downward
revision directly reflects the impact of current high construction costs
for new homes on investment plans from RSLs, some rephasing and
stricter implementation of deliverability criteria for inclusion of a site in
the SHIP. 
Table 1: Changes re SHIP 26/27 and SHIP 27/28 
Midlothian
Council New
Build
Programme
Registered
Social
Landlord(s) New
Build Programme
Total number of
new build
affordable homes
(MC + RSLs)
SHIP
2026/27  
2030/31
643 910 1553
SHIP
2027/28  
2031/32
470 629 1099  
Page 107 of 260

Page 108

4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
Midlothian Council’s New Build Programme has been closely aligned
with Housing Revenue Account affordability and the Rent Setting
Strategy 2026/27 – 2028/29. 
Those elements not funded by grant are funded through the Housing
Revenue Account, where delivered by Midlothian Council, or through
affordable housing RSL partners. 
As detailed in the Council’s Housing and Building Maintenance Update
2025-2026, Midlothian is bucking the national trend of housebuilding
decline, delivering a disproportionately high 598 construction starts
compared to the Scottish local authority average of 467. 
Midlothian is actively carrying the obligation of delivery during a
national housing downturn, yet funding to deliver affordable homes
does not match that disproportionate contribution being made by
Midlothian. 
Because national subsidy rates do not match the reality of Midlothian
output, affordable housing grant is significantly overstretched, leaving
housing sites with no grant to support subsidised affordable homes. 
Midlothian’s Resource Planning Assumption (RPA) from the Scottish
Government for 2026/27 is £10.586m. In 2024/25, the RPA was
£10.534m. However, over the course of the year, Midlothian Council
and the Scottish Government’s More Homes team worked together to
attract over £15m of grant into Midlothian’s programme. 
For 2026/27, the housing programme agreed with the Scottish
Government is 35% over-committed. This over-commitment is done at
risk, on the basis that, once again, additional grant can be secured
during the year over the initial allocation.   
Looking ahead, Midlothian Council is restricted in committing of 80% of
grant award in 2027/28 and 60% of grant in 2028/29. The cap on our
ability to assigned future grant to housing sites constrains the
affordable housing supply programme, as we cannot give certainty to
RSLs that we will support them. The ability to assign 100% of grant in
27/28 and 80% in 28/29 as a minimum would enable more proactive
planning of the programme ensure RSLs could plan for and bring sites
forward more quickly and effectively.     
Given the exceptional performance of the housing sector in Midlothian
and the pressure the affordable programme is under while grant levels
are not increased to reflect increased delivery, it is recommended that
Midlothian Council seeks an exemption from these caps in 2027/28 and
2028/29 at a minimum, to allow better forward programming and more
affordable homes to be funded for those in housing need. 
Page 108 of 260

Page 109

In addition, the limitations to Midlothian Council’s grant does not reflect
the Council’s very active house building sector and restricts the
Council’s ability to act as a Housing Authority and plan meaningfully for
a programme. Late, in-year, addition of grant is welcome, but requires
all partners to hold back on commitments until that additional grant is
confirmed. 
Where subsidy cannot be made available to housebuilders for the
delivery of their homes, alternative approaches to the delivery of
affordable housing should be considered. 
4.2 Digital 
N/A 
4.3 Risk 
If the Council does not support the development of new affordable
housing, the level of housing need will increase with negative
consequences for Midlothian’s communities. 
Risk across the affordable housing programme is monitored, reported
and managed through the Housing Programme Board and the Capital
Plan and Asset Management Board (CPAMB). 
Given Midlothian’s position as the highest-performing house builder per
head of population in Scotland, the severe risks associated with
securing Scottish Government grant funding to match the level and
number of homes programmed to be constructed in Midlothian are
magnified. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
Equality is central to all housing and housing services delivery. An
Integrated Impact Assessment (IIA) has been undertaken on this year’s
Midlothian Strategic Housing Investment Plan 2027/28 – 2031/32 to
ensure that the needs of local communities have been fully considered.
The SHIP reflects identified needs and draws on findings from the IIA
when considering the implications flowing from the translation of
strategic aims into housing policies. 
4.5 Additional Report Implications (See Appendix A) 
See Appendix A 
Page 109 of 260

Page 110

Appendices 
Appendix A – Additional Report Implications
Appendix B – Background information/Links 
Page 110 of 260

Page 111

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
This Strategy aligns with Midlothian’s Single Midlothian Plan and with
corporate priorities. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational  
Preventative  
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
The AHSP delivers best value for Midlothian Council through the
subsidisation of the construction of affordable homes to rent to those in
housing need in Midlothian. Well built, high quality and energy efficient
homes remain an asset for Midlothian Council over their lifetime,
generating income and providing housing stability for tenants. 
A.5 Involving Communities and Other Stakeholders 
Extensive consultation was carried out for the Local Housing Strategy
involving the input of key stakeholders, including local organisations
such as housing associations and private landlords as well as the wider
community.  During consultation, it was widely recognised that
investment in affordable housing a key priority. All developing Housing
Associations have discussed their development plans with Council
Officers. Private sector developers were also given the opportunity to
discuss their future development plans with Council Officers. 
Page 111 of 260

Page 112

A.6 Impact on Performance and Outcomes 
The SHIP supports the following Local Housing Strategy (LHS)
Outcomes, these are: 
• Households have improved housing options across all tenures. 
• Homeless households and those threatened with homelessness
are able to access support and advice services and all
unintentionally homeless households will be able to access settled
accommodation. 
• The condition of housing across all tenures is improved. 
• The needs of households with particular needs will be addressed
and all households will have equal access to housing and housing
services. 
• Housing in all tenures will be more energy efficient and fewer
households will live in or be at risk of fuel poverty. 
A.7 Adopting a Preventative Approach 
Setting out a programme for development in the SHIP enables the           
investment of affordable housing to be carried out in a balanced             
approach in order that any investment takes into account the needs of             
the community.  This includes those with particular needs such as extra  
care housing for older people, wheelchair housing or those with
complex physical or learning disabilities where provision of suitable
housing would require less resourcing in comparison to traditional
models of care. 
A.8 Supporting Sustainable Development 
All new build homes in the Strategic Housing Investment Plan 2027/28-
2031/32 are scheduled to meet green standards. Midlothian Council is
delivering 208 homes built to Passivhaus standard, the largest such
programme in Scotland. 
Page 112 of 260

Page 113

APPENDIX B 
Background Papers/Resource Links (insert applicable papers/links) 
Page 113 of 260

Page 114

Page 114 of 260

Page 115

1 
Midlothian Council
Strategic Housing Investment Plan
2027/28 – 2031/32 
Page 115 of 260

Page 116

2 
Front page photographs
Top: Completed homes by Midlothian Council in Morris Road, Easthouses
Bottom: Completed homes by Melville Housing Association in Mayfield
Page 116 of 260

Page 117

3 
Contents
1 Introduction and Strategic Links ........................................................................................... 4
Housing to 2040 ............................................................................................................... 4
Local Housing Strategy................................................................................................... 4
Rapid Rehousing Transition Plan .................................................................................. 4
Local Child Poverty Action Report ................................................................................. 5
2 Profile of Midlothian .................................................................................................................. 5
Housing Market Areas (HMAs) ....................................................................................... 5
Housing Tenure in Midlothian ........................................................................................ 6
Social Housing Demand .................................................................................................. 6
Affordable Housing Development in Midlothian ......................................................... 10
Open Market Purchases ................................................................................................ 11
Open Market Shared Equity .......................................................................................... 12
Mid-Market Rent (MMR) ................................................................................................. 12
3 Partnership Working ............................................................................................................... 13
Health and Social Care .................................................................................................. 14
Edinburgh and South East Scotland City Region Deal ............................................... 14
Methods of Construction .............................................................................................. 15
Town Centre Regeneration ........................................................................................... 15
4 Investment Priorities and Resources ................................................................................. 16
Council Development Priorities .................................................................................... 17
RSL Development Priorities ......................................................................................... 19
Addressing Potential Development Constraints ......................................................... 22
Scottish Government Affordable Housing Supply Funding Required ....................... 23
Specialist Housing ........................................................................................................ 23
Midlothian Council Resources ..................................................................................... 25
Commuted Sums ........................................................................................................... 26
Empty Homes, Second Homes and Council Tax Charges .......................................... 26
Gypsy Traveller Accommodation ................................................................................. 27
Non-Traditional Financial Models of Development ..................................................... 28
Housing Infrastructure Fund ..................................................................................... 28
5 Conclusion ................................................................................................................................. 28
Equality Impact Assessment (EIA) and Strategic Environmental Assessment ........ 29
Appendix 1: SHIP Project Tables .................................................................................................... 30 
Page 117 of 260

Page 118

4 
1 Introduction and Strategic Links 
The Strategic Housing Investment Plan (SHIP) is the key document for identifying
strategic housing projects that will contribute to meeting the Government’s 110,000
affordable housing target. This document is updated annually to present up to date
information on affordable housing investment plans. 
The SHIP provides an opportunity for the Council to: 
• Set out investment priorities for affordable housing and identifies how these will
be delivered
• Identify the resources required to deliver these priorities; and
• Involve key partners in the delivery of new affordable housing. 
The SHIP will continue to inform the allocation of resources from the Scottish
Government’s Affordable Housing Investment Programme, which primarily supports
the delivery of affordable housing via the Council and Registered Social Landlords. In
addition, other funding streams that support investment in affordable housing have
also been evaluated. 
Housing to 2040
In March 2021, the Scottish Government published its first long-term housing strategy
‘Housing to 2040’ which set an ambition to deliver a further 110,000 affordable homes
by 2032, with at least 70% of these for social rent.  Meeting this target is ambitious
and will require significant investment by the Scottish Government, Local Authorities
and Registered Social Landlords and a step change in the pace of housebuilding in
order that it is achieved. The delivery of more affordable housing remains a high
priority for Midlothian Council, as reflected by our ongoing and ambitious development
programme. 
Local Housing Strategy
The purpose of Midlothian’s Strategic Housing Investment Plan (SHIP) is to set out
strategic investment priorities for affordable housing over a five-year period to achieve
the outcomes set out in the Local Housing Strategy (LHS). The SHIP priorities are
clearly aligned with the LHS Outcomes Action Plan 2026/27 – 2030/31 which can be
accessed here:
Housing strategy documents | Local Housing Strategy 2026/27 - 2030/31 
Rapid Rehousing Transition Plan
The strategic housing priorities of the SHIP are aligned and consistent with the
priorities and outcomes within the Rapid Rehousing Transition Plan and the annual
updates to the document. The latest Rapid Rehousing Transition Plan can be found
here:
Rapid Rehousing Transition Plans | (midlothian.gov.uk) 
Page 118 of 260

Page 119

5 
Local Child Poverty Action Report
The latest report1, published in November 2025, notes that 25% of children in
Midlothian are living in relative poverty (after housing costs). A key driver for reducing
the level of poverty is reducing the cost of living for families. The Strategic Housing
Investment Plan will continue to support this by:
• Increasing the total number of affordable homes in Midlothian. For many
households this will result in significantly reduced rental payments and an
improved quality of life, for example, by alleviating overcrowding in a household
and providing a home which costs less to heat. 
• The Open Market Purchase Scheme in 26/27 will focus on properties for larger
families who require 3+ bedrooms
• Full alignment with the Midlothian Local Housing Strategy outcome action plan
which includes several actions to reduce poverty 
The SHIP is aligned with the strategic housing priorities of the Midlothian Local Child
Poverty Action Report and the Rapid Rehousing Transition Plan which aims to: 
• Prioritise access to tenancy support for tenants and housing applicants with
children who are living in, or at risk of poverty
• Reduce the number of households with children in temporary accommodation. 
2 Profile of Midlothian
Housing Market Areas (HMAs) 
Midlothian is situated within the Edinburgh and South-East of Scotland City Region
area and is therefore influenced by the wider region in terms of where households
choose to live and work. The table below shows the two HMAs along with their
corresponding towns and villages, while the map shows the geographical spread of
the HMAs. The Midlothian West (A) HMA is denoted in purple while the Midlothian
East (B) HMA is denoted in blue colour. 
Table 2.1: Main Settlements in Housing Sub Market Areas
Housing Sub Market Area Main Settlements
Midlothian West (A) Penicuik, Loanhead, Bilston, Roslin,
Straiton, Auchendinny
Midlothian East (B)
Dalkeith, Bonnyrigg, Gorebridge,
Rosewell, Mayfield, Easthouses,
Pathhead, Newtongrange,
Danderhall/Shawfair 
1 Child Poverty Action Reports
Page 119 of 260

Page 120

6 
Figure 1: Map showing Midlothian Housing Sub Market Areas 
The Housing Market Areas are the core development areas in Midlothian which
concentrates new development in Midlothian on: 
• The A701 Corridor
• The A7/A68/ Borders Rail Corridor
• Shawfair   
Most of the affordable housing units to be delivered are in the Midlothian East area,
largely due to the population, and therefore housing need being greater in this housing
market area. The Danderhall/Shawfair/Millerhill area continues to see a significant
level of new development with an allocation of land for over 4,000 houses and a town
centre including retail and school provision. The initial new sites for development have
been completed with further sites under construction. 
Housing Tenure in Midlothian
The most common housing tenure in Midlothian is owner occupied housing (65%)
followed by social rented housing by the council (17%), privately rented homes (9%)
and housing associations (8%)2. 
Social Housing Demand
An analysis of social housing in Midlothian shows: 
• There are 7,472 Council homes in Midlothian. The majority of stock has two
bedrooms (4,042 homes), followed by properties with three bedrooms (1,991
homes). There are fewer properties with one bedroom (1082 homes) and 4 or
more bedrooms (357 homes). 
2 Housing statistics: Stock by tenure - gov.scot
Page 120 of 260

Page 121

7 
• There is less demand for Midlothian Council homes with three and four bedrooms.
One and two bedroom properties are most in demand from those on the housing
list (25% and 57% accordingly) whilst only 18% of applicants require 3 and 4 bed
homes (13% and 5% accordingly)3.
• There are currently 3,646 RSL properties in Midlothian. Table 2.2 below, shows
how many properties each landlord has.   
Table 2.2: Number of Registered Social Landlord (RSL) properties in Midlothian4
Registered Social Landlord (RSL) Number of
properties
Melville Housing Association 2071
Places for People Housing Association 1100
Wheatley Homes East Housing
Association 242
Bield Housing Association 116
Trust Housing Association 35
Viewpoint Housing Association 33
Blackwood Housing Association 23
Link Housing Association 20
Ark Housing Association 6
Total 3646 
3 Midlothian Council Pressure Analysis 2025/26
4 Scottish Housing Regulator June 2026
Page 121 of 260

Page 122

8 
Figure 2 below illustrates the low demand for larger family homes in Midlothian; just
5% of waiting list applicants require a property with four or more bedrooms.  Midlothian
Council recognises the recommendations within the Scottish Government’s ‘Best
Start, Bright Futures: tackling child poverty delivery plan 2022 to 2026’5 which states
that ‘we will place the prioritisation of tackling child poverty at the heart of the
Affordable Housing Supply Programme through further strengthening our housing
planning processes to strengthen the focus on housing needs by size and location to
ensure that larger family homes are delivered where they are required, including
through the targeted purchase of appropriate ‘off the shelf’ properties’. Midlothian
Council will continue to deliver new homes which focus on the housing needs of
waiting list applicants by size and location. The Open Market Purchase Scheme also
targets homes of a particular size and location when required. 
Figure 2: Waiting list demand by bedroom size 
Figure 3 below, shows the number of Midlothian Council lets in recent years.  It shows
that between 2015/16 and 2024/25 allocations increased by 102% due to changes to
the Housing Allocation Policy, new build completions and the Open Market Purchase
Scheme. In 2025/26 the number of lets fell to 497 due to completion delays for some
new build sites. Whilst tenancy turnover remains low, it is expected that the annual
number of lets will increase in future years as a result of the new build programme. 
5 Executive Summary - Best Start, Bright Futures: tackling child poverty delivery plan 2022 to 2026 -
gov.scot (www.gov.scot)
25%
57%
13%
5%
1 bedroom 2 bedrooms
3 bedrooms 4 bedrooms
Page 122 of 260

Page 123

9 
Figure 3: Number of Midlothian Council Lets 
Figure 4 shows that the number of households on Midlothian Council waiting lists
increased by 66% between 2021 and 2024, reduced by 14% between 2024 and 2025
and then increased again by 11% in 2026. The number of households currently on the
list is attributable to several nationwide economic factors as well as increased local
awareness of Midlothian Council’s new build programme. 
Figure 4: Number of Households on Midlothian Council Housing List 2018 - 2026 
Figure 5 below shows the number of homeless applicants on the waiting list since
2021/22. In 2024/25 and 2025/26 there were 646 homeless applications on the waiting
273 299 319 320 306
359
431
475
552 588
497
0
100
200
300
400
500
600
700
No. of Midlothian Council lets
4664 4645
4007 3930 4237 4468
6517
5637
6255
0
1000
2000
3000
4000
5000
6000
7000
2018 2019 2020 2021 2022 2023 2024 2025 2026
No. of households on Midlothian Council waiting lists
Page 123 of 260

Page 124

10 
list which was a slight decline from the 662 applications in 2023/24. The number of
households experiencing homelessness is synonymous with the nationwide housing
affordability and cost of living crises. 
Figure 5: Number of Homeless Applications by year 
Affordable Housing Development in Midlothian
Table 2.3 shows the level of investment in new affordable homes in Midlothian since
2006 (when the Council began building new homes again). It shows that 1,805 Council
homes have been built, and a total of 2,549 Council and RSL affordable units have
been built overall. It should be noted that these figures report completions by calendar
year up to December 2025 and don’t include open market purchases or shared equity
purchases which have been recorded seperately. 
634
600
662
646 646
560
570
580
590
600
610
620
630
640
650
660
670
2021/22 2022/23 2023/24 2024/25 2025/26
Page 124 of 260

Page 125

11 
Table 2.3: New Affordable Housing in Midlothian since 20066
Year of completion
No. of completed
Council units (Social
Rent only)
No. of completed RSL
units (Social Rent and
Mid Market Rent)
2006 0 19
2007 28 12
2008 172 42
2009 237 10
2010 88 20
2011 160 33
2012 170 121
2013 76 6
2014 0 20
2015 48 0
2016 41 28
2017 87 0
2018 0 103
2019 10 39
2020 31 0
2021 90 48
2022 122 0
2023 243 149
2024 111 25
2025 91 69
Total 1805 744
Open Market Purchases
Midlothian Council has an Open Market Purchase Scheme whereby ex-council
properties are purchased and returned to housing stock, helping to meet immediate
housing requirements. Table 2.4 below details the number of Open Market Purchases
carried out in recent years. 
Table 2.4: Number of Open Market Purchases7
Financial year No. of Open Market Purchases
2017/18 7
2018/19 13
2019/20 42
2020/21 14
2021/22 22
2022/23 21
2023/24 26
2024/25 7
2025/26 10
Total 162 
6 Housing statistics quarterly update: new housebuilding and affordable housing supply -
gov.scot (www.gov.scot)
7 Midlothian Council Housing Strategy and Performance statistics
Page 125 of 260

Page 126

12 
Open Market Shared Equity
A number of Midlothian residents have been able to purchase affordable homes using
the Scottish Government’s Open Market Shared Equity Scheme (OMSE) whereby
purchasers pay for the biggest share of a property, and the Scottish Government hold
the remaining share under a shared equity agreement. Table 2.5 below shows the
number of successful home purchases in Midlothian using the Open Market Shared
Equity Scheme (and predecessor schemes which operated similarly). 
Table 2.5: No. of OMSE home purchases in Midlothian8
Financial Year No. of OMSE home purchases
2006/07 45
2007/08 62
2008/09 8
2009/10 41
2010/11 28
2011/12 3
2012/13 13
2013/14 42
2014/15 53
2015/16 93
2016/17 126
2017/18 104
2018/19 72
2019/20 16
2020/21 13
2021/22 15
2022/23 27
2023/24 36
2024/25 4
2025/26 6
Total 780 
Mid-Market Rent (MMR)
Mid-market rent (MMR) is a type of affordable housing with rents being lower than in
the private market, but higher than in the social housing sector. MMR aims to help
households on modest incomes, who have difficulty accessing social rented housing,
buying their own home, or renting privately. Mid-market rent properties are delivered
by housing associations and local authorities through arm’s length vehicles and some
private developers. 
MMR is aimed at households who have a consistent income and have a local
connection. MMR tenancies are let under a Private Residential Tenancy Agreement. 
8 Scottish Government More Homes Division
Page 126 of 260

Page 127

13 
Midlothian’s Mixed Tenure Strategy was approved by Council in 2024 and includes
three MMR action points:
• Deliver Mid-Market Rent (MMR) units within Midlothian Council developments,
initially through partnership with RSL. This should only be done where the RSL
partner has an allocation policy that aligns with prioritisation of Midlothian
residents.
• Continue to explore potential for establishment of Arm’s Length External
Organisation, if resources allow, for directly delivered MMR homes by
Midlothian Council.
• Agree development of a business case by Scottish Futures Trust (SFT), the
Scottish Government’s Infrastructure agency, on advantage of leveraging in
institutional investment for delivery of MMR by Midlothian Council via a potential
lease-based model. 
Means of delivering MMR in the Council’s plans for the redevelopment of Dalkeith 
Town Centre have been incorporated into the Outline Business Case under
development. In addition, Midlothian Council has set up workshops on a regional 
approach to MMR delivery working with City Deal partners on this initiative.   
This SHIP includes details of MMR projects currently under development by RSLs in
Midlothian.
3 Partnership Working 
Partnership working is crucial to the delivery of high-quality housing and housing
related services across all tenures in Midlothian. As part of the development of this
SHIP, Council Officers have engaged and consulted with all delivery partners on their
proposals and priority projects. 
In order to identify suitable investment priorities council officers have worked with the
Scottish Government, Housing Associations, tenants groups, private developers and
colleagues in the planning, finance, estates and construction teams to determine the
level of housing need in the region, the level of demand for different tenures of
affordable housing and the mix of suitable house sizes and types in order to agree a
five year programme of development, informed by the current housing needs and
demand assessment (HNDA) and the National Planning Framework 4 (NPF4). 
The development priorities in the SHIP will be monitored in several ways including:
• Monitoring and reviewing of the actions in the Local Housing Strategy
• Annual assessment of the Council’s Housing Supply Targets
• Annual assessment of RSLs’ housing delivery
• Monitoring of housing need and demand.
• Reports and returns submitted to the Scottish Government 
SHIP consultation methods are cyclical throughout the year and include:
• Quarterly Local Housing Strategy Forum meetings with RSLs, Shelter, the
Scottish Government and council stakeholders from Environmental Health,
Housing and Planning.
Page 127 of 260

Page 128

14 
• Quarterly More Homes Division RSL liaison meetings
• Attendance at community events/open days/tenant meetings
• Representation at City Region Deal meetings
• Representation at Health and Social Care meetings 
Health and Social Care
Housing providers in Midlothian work collaboratively with health and social care
colleagues to ensure that housing provision in Midlothian can better meet the needs
of households who may require specialist housing provision to be able to live
independently. The types of outcomes that this will facilitate include: 
• Increased specialist housing provision because of improved understanding of
the future needs of the population, such as developing extra care housing which
provides an alternative to living in a care home for some people.
• Increased number of wheelchair accessible housing
• Identification of the level of need for, and funding of, adaptations to ensure that
people living in private sector housing and council housing can continue to live
independently.
• Improving the health outcomes for homeless households, many of whom
currently have poorer levels of physical health and mental health than the
general population.
• Taking action to improve the energy efficiency of housing and reducing fuel
poverty which would lessen the risk to a household’s health and wellbeing. 
More information is contained in the Midlothian Health and Social Care Partnership
Strategic Plan 2025 - 2035, available here:
Midlothian Integration Joint Board Strategic Plan 2025-2035 - Midlothian Health and Social
Care Partnership 
Edinburgh and South East Scotland City Region Deal
The Edinburgh and South East Scotland City Region comprises the six local
authorities of City of Edinburgh, Fife, East Lothian, Midlothian, Scottish Borders and
West Lothian. Officers from these Councils collaborate with the UK and Scottish
Governments respectively to deliver a transformational and inclusive city deal for the
region which will attract investment of up to £1.5 billion over 15 years. This includes
investment and collaboration on housing. Housing is included within the City Region
Deal as it is recognised as being an area of pressure but also an opportunity for
accelerated economic growth while reducing social exclusion. 
Most Councils in the South East of Scotland face the same pressures when
addressing housing need with the most recent housing need and demand assessment
for the region estimating at least 67,000 new homes are required by 2030. 
Key housing investment areas in Midlothian that are being supported through the City
Region Deal include:
Page 128 of 260

Page 129

15 
• Supporting a 10-year affordable housing programme across the region with
Scottish Government grant funding.
• Supporting local authority borrowing and share financing risk of infrastructure
delivery for key development sites.
• Provision of a £50 million housing infrastructure fund of predominantly private
sector loans to be spent on projects that will unlock housing in strategic
development sites across the region.
• Collaborating to develop innovative approaches which increase the use of
offsite construction methods.
• Establishing a council-owned regional housing company to deliver mid-market
and private rented sector housing (City of Edinburgh Council’s Edinburgh
Living). 
Methods of Construction
The SHIP explicitly details the deployment of varied construction methods—including
open panel timber frame, closed or partially closed panel timber frame, modular
systems, and projects currently categorised as not yet determined—to accelerate the
delivery of local affordable housing priorities. As part of this strategy, the Council is
piloting modular construction for the Newtongrange housing project for 23 homes,
specifically targeting a reduction in overall construction time and minimising disruption
to the surrounding local residential area. To maximise efficiency and scalability across
all these construction typologies, Midlothian Council actively facilitates strategic
collaboration focused on design and mass customisation to standardise high-quality
housing archetypes, and joint procurement strategies that aggregate demand, secure
supply chains, and drive cost-efficiencies for all construction methodologies. 
Town Centre Regeneration
The Town Centre First Principle was agreed by the Scottish Government and the
Convention of Scottish Local Authorities in July 2014 and asked that government, local
authorities, the wider public sector, businesses and communities put the health of town
centres at the heart of decision making. It seeks to deliver the best local outcomes,
align policies, and target available resources to prioritise town centre sites,
encouraging vibrancy, equality and diversity. 
In response to the COVID-19 pandemic and other pressures being experienced by
town centres, a New Future for Scotland’s Town Centre was published in February
2021 by the Scottish Government. This document and NPF4 support town centre living
(TCL) and recognise that the development of homes in town centres is critical to
achieving sustainable places.   
Town Centre Living requires a collaborative approach which strengthens the long-term
plan for each town centre. Work is underway by Midlothian Council and partner
organisations to regenerate Dalkeith9 and Newtongrange10 town centres to provide 
9 Have your say: Dalkeith Town Centre Regeneration | Creating a fresh vision for Dalkeith
town centre | Midlothian Council
10 Newtongrange and Stobhill and Lady Victoria | Masterplans | Midlothian Council
Page 129 of 260

Page 130

16 
more and better housing, enhance their role as 20-minute neighbourhoods and allow
greener buildings and town centres to become net zero by 2030. Midlothian Council 
is current engaging withTown Centre Living Partnership to assist in the delivery of 
Dalkeith Town Centre regeneration. 
4 Investment Priorities and Resources
In order for the SHIP to deliver strategic investment priorities for affordable housing in
Midlothian, the Council has engaged with RSLs and relevant delivery partners in
setting out Midlothian’s investment priorities for affordable housing. To ensure that
available resources are prioritised in delivering affordable housing, each project is
scored against a set of criteria: Housing Need; Land Availability; Ability to Start on
Site; Constraints; Equalities Needs and Environmental Impact, as shown in the tables
below. In total, a project can be awarded a maximum score of 30 points and a
score of less than 18 indicates a ‘low priority project’, 18-22, ‘a medium priority
project’ and over 22, a ‘high priority project’. 
Table 4.1: Project Prioritisation Scoring
Criteria Explanation Score
Area Housing Need
Housing need rankings are based on a waiting list demand
study. 1 would indicate no housing need in an area, whilst
5 indicates the highest level of need. 
1-5
Land Availability
Sites ranked most highly are those owned by the Council
or RSL. Also ranked highly are sites with Planning
Permission in place. Sites owned by a private developer
should not be ranked as highly as those owned by the LA
or RSL e.g. a site owned by the LA will full planning
permission would score 5
1-5
Ability to Start on Site
A site with a high score indicates that the work could start
on site once funding was approved. A project would only
score 5 if all permissions are in place and the site has been
acquired e.g. the site could start immediately once funding
is approved
1-5
Constraints
Issues such as Section 75 requirements that have yet to
be resolved would be given a lower score. Infrastructure
constraints should be included. A site should only score full
marks if it is fully unconstrained.
1-5
Equalities Needs
All sites will score at least a good rating (3) due to Housing
for Varying Needs.  Additional points would be awarded for
specialist provision housing. Three is the minimum score,
sites should only be scored higher if they include 'specialist
housing provision' units. Sites which include 'specialist
housing provision' units enable the LA to meet the
Wheelchair Accessible Housing Targets. These sites will
be monitored to ensure their  inclusion in the Midlothian
Integration Joint Board Strategic Plan Housing
Contribution Statement
1-5
Page 130 of 260

Page 131

17 
Criteria Explanation Score
Environmental Impact
All sites which have been allocated through the Midlothian
Local Plan would not be considered as having a negative
environmental impact. Use of renewable technology and
building on Brownfield sites would score more points.
Consideration should be given as to whether the units will
be Passivhaus standard or whether the site will be
brownfield or greenfield e.g. passivhaus units on a
brownfield site should be scored a 5, units on greenfield
sites should score less
1-5 
Table 4.2: Area Project Prioritisation Score
Area Points
Bonnyrigg, Lasswade, Poltonhall, Loanhead, Newtongrange, Danderhall,
Shawfair, Dalkeith 5
Gorebridge, Mayfield, Easthouses, Penicuik 4
Small Settlements including Pathhead, Roslin, Rosewell, Bilston, Auchendinny,
Temple, Carrington, North Middleton and Cousland 3 
The sections below show both Council and RSL housing development priorities over
the next five years. It should be noted that sites indicated are subject to change as
some sites have not yet been approved by the developing organisation, received
planning permission or land ownership has not been secured. More detail on each site
is shown in Appendix 1. 
Council Development Priorities
The table below sets out the priorities for proposed Council projects over the next five
years. Key notes: 
• Nine development projects are currently proposed by Midlothian Council over the
next five years.
• Projects which are currently onsite and in receipt of government funding do not
need to be prioritised. 
• Following analysis, four of the nine proposed projects by Midlothian Council met
the criteria required to be considered high priority whilst five are medium priorities.
There are no projects assessed as be low priority.   
The table below is a photo image and as such is not accessible to everyone. The
original Midlothian Council Development Prioritisation table 2027/28 – 2031/32 (in
excel format) can be found here: 
Housing strategy and performance | Midlothian Council 
Page 131 of 260

Page 132

18 
Table 4.3: Council Housing Development Priorities 
Housing Need
Land Availability
Ability to Start on
Site
Constraints
Equalities Needs
Environmental
Impact
Total
2027/28
Shawfair, Old Craighall Road,
plot AE (Bellway): P41836 5 3 4 4 3 3 22
Auchendinny, Phase 2
(Bellway): P48309 3 5 5 5 3 3 24
Open Market Purchases (MC) 5 5 5 5 3 5 28
Lingerwood (Barratt): P41724  4 3 3 4 3 3 20
Millerhill, Cocklerow Gardens
(Robertsons) 5 3 4 4 3 3 22
2028/29
Mayfield, Blackcot Drive (MC) 4 4 3 3 3 3 20
Auchendinny, Phase 3
(Bellway): P43810 3 5 5 5 3 3 24
Rullion Road, Penicuik (MC):
P46386 4 4 4 4 4 3 23
2029/30 None 0 0 0 0 0 0 0
2030/31 Mayfield, Bogwood Road (MC) 4 4 3 3 3 4 21
2031/32 None 0 0 0 0 0 0 0
Page 132 of 260

Page 133

19 
RSL Development Priorities
The table below sets out the priorities for proposed RSL projects over the next five
years. It should be noted that each RSL prioritised their proposed sites using
Midlothian Council guidelines. 
Key notes:
• 21 development projects are proposed by RSLs over the next five years.
• Some of these projects contain several phases of development, each having its
own prioritisation and SHIP entry.
• Projects already in receipt of government funding do not need to be prioritised.
• Twelve of the projects were assessed as being high priority while nine scored as
medium priority. No projects scored as a low priority.
• Six RSLs have indicated their plans to develop during this period including:
- Places for People (8 projects)
- Melville Housing Association (3 projects)
- Wheatley Homes East (5 projects)
- Link Housing Association (1 project)
- Viewpoint Housing Association (1 project)
- Lar Housing Trust (3 projects) 
The table below is a photo image and as such is not accessible to everyone. The
original Midlothian Council Development Prioritisation table 2027/28 – 2031/32 (in
excel format) can be found here: 
Housing strategy and performance | Midlothian Council 
Page 133 of 260

Page 134

20 
Table 4.4: RSL Housing Development Priorities 
Housing Need
Land Availability
Ability to Start on Site
Constraints
Equalities Needs
Environmental Impact
Total
2027/28- Projects
Melville - Bilston 3b (TW) 3 4 5 5 3 4 24
Melville - Bannock Wood,
Bonnyrigg Ph1 (TW) 5 4 4 4 3 4 24
PFP - Shawfair Town Centre
North Bellway Plots E2 - SR 5 3 3 4 3 4 22
PFP - Shawfair Town Centre
North Bellway Plots E2 - MMR
5 3 3 4 3 4 22
PFP - Cauldcoats Phase 1 - SR 5 4 3 4 4 4 24
PFP - Cauldcoats Phase 1 - MMR 5 4 3 4 4 4 24
Lar- Wester Cowden-MMR 5 5 4 4 4 4 26
Lar- The Brae, Auchendinny MMR 3 4 3 3 4 4 21
WHE - Shawfair Woolmet 2 Ph2 5 4 3 4 3 4 23
WHE - Millerhill R 5 4 3 4 3 4 23
WHE - Dalhousie Ph 3 5 4 5 5 3 4 26
WHE - Wellington School 5 3 2 5 5 4 24
Link - Thornybank 5 2 2 2 3 4 18
Page 134 of 260

Page 135

21 
2028/29 Projects Melville - Bannock Wood,
Bonnyrigg Ph 2 (TW) 5 4 4 4 3 4 24
WHE - Millerhill B/C2 5 4 3 4 3 4 23
2029/30  Viewpoint - Glenesk, Dalkeith 5 5 3 3 5 4 25
Lar- Fordel MMR 5 4 2 2 4 4 21
2030/31 PFP - Cauldcoats Phase 2 - SR 5 3 2 4 4 4 22
PFP - Cauldcoats Phase 2 - MMR 5 3 2 4 4 4 22
2031/32 PFP - Cauldcoats Phase 3 - SR 5 3 2 4 4 4 22
PFP - Cauldcoats Phase 3 - MMR 5 3 2 4 4 4 22 
Scottish Government Resource Planning Assumption Allocations for the Midlothian
area (including RSL delivery) for four years have been confirmed and are shown in the
table below. 
Table 4.5: Midlothian Resource Planning Assumption Allocations 2026/27 –
2029/30
2026/27 £10,586,000
2027/28 £10,904,000
2028/29 £11,231,000
2029/30 £11,568,000
Total £44,288,000 
Midlothian Council sites not yet approved for Scottish Government funding have been
carefully scheduled and cross referenced with phase 5/6 budgets and rent setting
timelines. The prioritisation process will enable these sites to be considered for funding
approval on release of future RPAs during regular Scottish Government liaison
meetings.  
Page 135 of 260

Page 136

22 
Addressing Potential Development Constraints 
Midlothian Council and developing partners are assured that the SHIP can be
delivered given the actions and initiatives undertaken to date by the Council and its
strategic partners to source suitable sites for development and access funding.
However, several challenges need to be addressed by the Council and its partners in
order that the pace of development can be continued. 
These challenges include: 
• The reduced Affordable Housing Supply Programme budget in 2024/25 resulted in
developing landlords ‘front funding’ sites until further Scottish Government funding
was available. This has led to a ‘bottleneck’ of sites requiring funding. 
• In recent times, the construction industry in Scotland and across the UK has faced
unprecedented adverse market conditions, resulting in significant increases in
tender prices for a wide range of materials. While previous evidence suggested
severe inflation spikes of 10–15% above standard forecasts, current data from the
Building Cost Information Service (BCIS) indicates a stabilising but upward trend,
with the All-In Tender Price Index (TPI) projected to increase by 3.2% year-on-
year. While measures such as value engineering are helping to partially offset
these pressures, there remains a risk that the capital budgets allocated for delivery
of the New Social Housing programme may require uplift, with consequent
implications for the overall funding strategy.
• In Midlothian, this position is further challenged by rising levels of private
housebuilding, which generate more sites where a 25% affordable housing
requirement must be met. In addition, evolving national policy and regulatory
changes — including updated building standards and Scottish Government
requirements on zero-emissions heating — continue to drive additional costs
across projects. Ongoing construction price inflation compounds these pressures.
• Difficulty acquiring, designing and delivering affordable housing sites out with
section 75 provision
• Managing landowner value expectations
• RSL uncertainty surrounding housing site allocation within Midlothian Local
Development Plan 2
• Obtaining required planning approval. 
• A diminishing number of Midlothian Council owned sites mean that many future
sites will be controlled by a third party.
• Building and procurement constraints. 
• Environmental and design issues.
• The commencement of affordable housing sites is dependent on developers’
timescales and the economic conditions of the housing market. 
• Unknown site ground conditions. 
• The rural nature of some areas in Midlothian can mean that development is
constrained in these areas, particularly in relation to available land for housing and
the requirements for additional infrastructure prior to development
commencement.   
Ongoing activities to resolve these issues include:
Page 136 of 260

Page 137

23 
• Housing Revenue Account financial planning in conjunction with Midlothian
Council Rent Setting Strategy timescales.
• Rephasing delivery to align with funding availability.
• As per Midlothian Council’s Mixed Tenure Strategy, alternative models of
affordable housing will be considered to ensure units continue to be delivered
while minimising subsidy requirements e.g. MMR, Golden Share. 
• Exploring alternative opportunities including land acquisition.
• Managing developer expectations regarding timing and nature of affordable
housing delivery. 
Scottish Government Affordable Housing Supply Funding Required 
The Strategic Housing Investment Plan details potential sites for 1,099 new affordable
homes to be built between 2027/28 and 2031/32, of which:
• House types: 1,041 are general needs homes and 58 are specialist provision
homes.
• Built form: 1,069 will be new build housing and 30 will be ‘off the shelf purchases’
• Tenure type: 470 homes will be Midlothian Council housing and 629 will be social
rented housing by an RSL of which 232 will be Mid-Market Rent (MMR)
• This reflects the fact that the affordable housing tenure with the highest demand is
social rented housing. 
• 178 units will be developed in sub-area A (Midlothian West) 
• 891 units are to be developed in sub-area B (Midlothian East). 
A total of £106.596 million of Scottish Government grant funding is required by the
Council and RSLs to deliver the identified units over the next five years:
• The year which requires the most grant funding is 2028/29, with a requirement of
£43.659 million.
• 470 of the units will be Council housing requiring £36.240 million grant funding. 
• 629 of the units will be RSL housing requiring £70.356 million Government funding. 
• The required level of grant funding to deliver this number of units greatly exceeds
the stated level of funding available. 
• The average cost of a Midlothian Council new build home is £288,000 with the
average minimum Scottish Government benchmark grant of £91,000 per unit. This
will leave a funding gap of 68% to be financed by the Housing Revenue Account.
Council Officers will continue to discuss resource requirements with the Scottish
Government to ensure that projects receive appropriate levels of grant funding. 
• It is important to note that a project’s inclusion within the SHIP is not a guarantee
of Scottish Government funding. 
Specialist Housing 
The Strategic Housing Investment Plan includes sites which will deliver 58 specialist
provision housing units. Different categories of specialist housing are planned
including:
• Wheelchair accessible housing
• Amenity housing
• Properties with wet floor showers
• Specialist provision for older people 
Page 137 of 260

Page 138

24 
In March 2022 Midlothian Council carried out a resident survey prior to setting
Wheelchair Accessible Housing Targets. Survey results have enabled the local
authority and RSL partners to prioritise building ‘specialist provision’ housing in areas
highlighted by respondents including Bonnyrigg, Dalkeith, and Gorebridge11. The
survey results also illustrated that certain housing characteristics should be
prioritised:
• House types – bungalows and houses 
• Tenure – owner occupancy and social housing (LA and RSL)
• Type – Midlothian Council specialist provision unit types are determined by
community health specialists
• Size – two- and three-bedroom properties 
Midlothian Council set Wheelchair Accessible Housing Targets of 20 per annum
between 2022/23 and 2026/27.  Fifty percent of these should be provided by the
private sector. 
The Midlothian Local Housing Strategy 2026/27 – 2030/31 contains an action to
ensure that RSLs include a minimum percentage of wheelchair accessible homes in
their annual SHIP returns: 
‘Housing Associations/RSLs to include a minimum of 5% wheelchair accessible
homes in annual Strategic Housing Investment returns to Midlothian Council’. 
Some RSLs have been unable to increase the number of wheelchair accessible
housing units in this year’s SHIP as planning permission for the sites has been
granted with house types and sizes confirmed prior to SHIP submission. Midlothian
Council officers will liaise with planning officers to implement an agreement where
proposals submitted for section 75 sites must have an RSL partner’s confirmation on
mix, size and tenure before planners will accept an application. 
Since August 2022 Midlothian Council has completed 93 wheelchair accessible
properties as shown in table 4.6 below. 
11 Housing strategy documents | Wheelchair Accessible Housing Targets 2022/23 - 2026/27
(midlothian.gov.uk)
Page 138 of 260

Page 139

25 
Table 4.6: Midlothian Council wheelchair accessible homes completed since
2022
Location No. of homes House type
Normandy Drive, Dalkeith &
Bonnet Drive, Mayfield 14 Wheelchair accessible houses
Normandy Court, Dalkeith &
St Cuthbert’s, Bonnyrigg 60 Amenity house – wheelchair accessible
Normandy Drive, Dalkeith 6 Ambulant disabled with wet floor showers
Newbyres Crescent &
Newbyres Village, Gorebridge 13 Houses - bungalows 
Table 4.7 includes details of a further 69 homes which are close to completion and
are therefore not included in the SHIP. 
Table 4.7: Midlothian Council wheelchair accessible homes in development
Location No. of homes House type
Polton Street, Bonnyrigg 46 Wheelchair accessible homes
Newton Church Road,
Danderhall 23 Wheelchair accessible homes 
Table 4.8 includes details of the 22 wheelchair accessible homes planned during the
five-year period of this SHIP. 
Table 4.8: Wheelchair accessible homes planned in SHIP 2027/28 – 2031/32
Location No. of homes Housing Provider
Rullion Road,
Penicuik 1 Midlothian Council
Blackcot Drive,
Mayfield 3 Midlothian Council
Thornybank, Dalkeith 3 Link HA
Glenesk, Dalkeith 3 Viewpoint HA
Cauldcoats 10 PFP HA
Wellington School,
Penicuik 2 WHE HA 
Progress made towards meeting the private sector target is being monitored via the
Local Development Plan draft process. 
Work is underway to set the wheelchair accessible housing targets for 2027/28 –
2031/32 with public consultation exercises scheduled to take place throughout
October 2026. 
Midlothian Council Resources 
This section contains details of Midlothian Council’s own resources which are
helping to support the delivery of affordable housing. 
Page 139 of 260

Page 140

26 
Commuted Sums 
In some circumstances the Council may consider accepting commuted sums from
private developers instead of the delivery of affordable housing units on some sites.
The funds are then used to support the delivery of housing on other sites. In 2023/24,
2024/25 and 2025/26 no commuted sums were received from private housing
developers. 
Midlothian Council’s Affordable Housing Supplementary Planning Guidance contains
details of the commuted sum policy:
Supplementary planning guidance | Planning advice and guidance | Midlothian Council 
Empty Homes, Second Homes and Council Tax Charges
Under the Local Government in Scotland Act 2003 as amended by the Housing
(Scotland) Act 2025 and subsequent regulations, Midlothian Council updated the
Council Tax charges applicable on empty and second homes, effective from 1st April
2026:
• A 100% discount applies for a maximum of 6 months for empty properties
• Standard Council Tax rate is charged for empty homes between 6 and 12
months
• There is a varying levy on long term (longer than 12 months) empty homes as
follows – additional 100% on homes empty between 12 months and 24 months,
additional 300% on homes empty between 24 and 36 months, additional 500%
on homes empty longer that 36 months
• A varying levy applies to second homes as follows – additional 100% charges
on second homes, increased to additional 300% from 24 months to 36 months,
additional 500% after 36 months. The exceptions are purpose-built holiday
homes and job-related properties, where 50% discount applies.
• Relevant exemptions may still apply in certain circumstances e.g. where the
property is fully owned by the estate of a deceased person. 
Whilst it is too soon to report on the revenue generated by this increased levy, it has
been estimated that revenue of £200k could be achieved in 2026/27. 
Midlothian Council recruited an Empty Homes and Retrofit Case Officer in January
2026. 0.5 FTE of that role is dedicated to bringing empty homes back into residential
use across all tenures. This role is part funded by the Scottish Government and part
funded by Council Tax raised against empty and second homes in Midlothian. An
Empty Homes Strategy is in the process of being produced. Until this recruitment we
have advocated the use of the Scottish Empty Homes Advice Service which looks at
the different options and the support available for properties which have been empty
for over 6 months. 
Neither Midlothian Council nor the Scottish Empty Homes Advice Service have an
overview of the number of empty homes brought back into use in Midlothian over the
last three financial years. Going forward, the Empty Homes and Retrofit Officer will be
able to report on this. Midlothian Council has a target of returning 10 homes to
residential use within the first year through the Empty Homes Officer role, with three
of these being returned to use as social rented properties. To date six homes have
Page 140 of 260

Page 141

27 
been brought back into use, including five into use as Council tenancies through the
Open Market Purchase Scheme. 
Table 4.9 below, illustrates the number of long-term empty homes and second homes
in Midlothian and compares them to the Scottish average. It is evident that the number
of long-term empty properties and empty second homes is significantly
below average. In 2025 the figures for Midlothian were just 33% and 22% of the
Scottish average respectively. The most recent figures from the Scottish Empty
Homes Partnership show that whilst Midlothian accounts for 1.64% of Scotland’s
housing stock, it accounts for 1.03% of Scotland’s empty homes12. 
Table 4.9: Number of Second Empty and Long-Term Empty Properties 2022-
202513 
Long-term empty and second homes 2022/23 2023/24 2024/25 2025/26
No. of long-term empty properties - Midlothian 359 423 332 332
No. of long-term empty properties - Scottish average 865 884 987 1011
No. of second homes (empty) - Midlothian 416 477 389 450
No. of second homes (empty) - Scottish average 2153 2196 2036 2043 
Despite the low number of second and empty homes, Midlothian Council’s Council
Tax levy protocol exists to financially support affordable housing in the area by
encouraging owners of empty and second homes to return these to residential use. 
Gypsy Traveller Accommodation
Improving the lives of Gypsy/Traveller communities is a significant human-rights
commitment for Midlothian Council and is crucial if we are to tackle deep-rooted
inequalities and deliver a fairer society. 
The Scottish Government and COSLA’s joint action plan, ‘Improving the Lives of
Scotland’s Gypsy/Travellers 2’ (GTAP2) included a commitment by the Scottish
Government to make funding for Gypsy/Traveller accommodation available alongside
housing under the Affordable Housing Supply Programme from April 2026. To date
Midlothian Council has not sought Gypsy/Traveller Accommodation Funding and will
continue to monitor budgetary guidance for doing so. 
The Gypsy/Traveller site managed by East Lothian Council on behalf of East and
Midlothian Councils closed in June 2021 following extensive vandalism. East Lothian
and Midlothian Councils are now in the process of determining future accommodation
options for Gypsy/Travellers. Midlothian’s Local Development Plan 2 (LDP2)14 is
currently being drafted with the Evidence Report including Gypsy/Traveller housing
need and demand reports and details of the community engagement process which
will help influence future accommodation options. The LDP2 process includes a ‘Call
for Ideas and Opportunities’ to provide individuals, communities, landowners, 
12 Where are Scotland's Empty Homes? - Scottish Empty Homes Partnership
13 Housing statistics: Empty properties and second homes - gov.scot (www.gov.scot)
14 Midlothian Local Development Plan 2 | Development plans and policies | Midlothian
Council
Page 141 of 260

Page 142

28 
developers or any other interested people, businesses or organisations with the
chance to put forward ideas, opportunities or suggestions on matters or sites they
would like to have included in MLDP2. At time of writing there is a 12-week public
consultation on the proposed Midlothian Local Development Plan 2 (MLDP2) with the
final document scheduled for adoption in 2027. 
Non-Traditional Financial Models of Development 
The use of innovative financial models is being encouraged in Midlothian to accelerate
the development of new affordable housing. Innovative approaches to development
often do not require traditional grant funding and can therefore increase the total
number of new affordable homes built. Between 2023/24 and 2025/26 several new
build sites benefitted from the Charitable Bond Programme; a loan scheme for
Registered Social Landlords (Housing Associations) to finance new development, with
the interest then reinvested as grants into the social rented sector. This allowed
traditional Affordable Housing Supply Programme investment to be targeted towards
Midlothian Council sites. 
Housing Infrastructure Fund
The Scottish Government’s Housing Infrastructure Fund (HIF) is aimed at supporting
housing development through loans and grants with priority being given to those
projects which will deliver affordable housing. The fund enables funding for housing
developments that have stalled or can’t proceed due to the excessive cost or nature
of the infrastructure works to be delivered. 
Eligible works for HIF could include on-site and off-site elements. Works will include
physical infrastructure generally required to start a project, such as roads, sewers,
SUDS ponds, decontamination, flood remediation and demolition work. Where a
Section 75 obligation requires it, certain off-site infrastructure is also eligible. The fund
does not support the provision of community infrastructure required as a consequence
of new housing development, for example, funding for schools. 
As part of developing the SHIP, Midlothian Council will work with partners to identify
and prioritise those sites which are of strategic importance and cannot proceed or have
stalled due to the extent and costs/financing of infrastructure works involved, and with
HIF’s support, unlock these sites for the delivery of housing15. The Council will work
with partners in examining the identified projects to ensure that such projects are
eligible for the fund16.   
Further information on the Housing Infrastructure Fund can be found here:
Housing Infrastructure Fund - More homes - gov.scot (www.gov.scot) 
5 Conclusion 
Midlothian Council officers continue to actively manage the new build housing
programme through funding shortages, adverse market conditions and rising levels
of private housebuilding generating more sites where a 25% affordable housing 
15 https://www.gov.scot/policies/more-homes/housing-infrastructure-fund/
16 https://www.gov.scot/publications/housing-infrastructure-fund-guidance-for-applications/
Page 142 of 260

Page 143

29 
requirement must be met. In addition, evolving national policy and regulatory
changes continue to drive additional costs across projects. Funding the social
housing programme remains challenging, strengthening the argument for an
increased Midlothian Resource Planning Assumption. 
The Midlothian Strategic Housing Investment Plan 2027/28 – 2031/32 identifies the
priorities for the development of affordable housing and where development will be
undertaken over the next 5 years. It identifies sites which can deliver 1,099 units
during the next 5 years to meet the increasing level of housing need in Midlothian.
This will not only ensure best value in the use of resources but also ensure the
delivery of the right mix of houses in the most pressured areas. 
If you have any comments or queries on the content of this document, please contact
the Housing Development Section at Midlothian Council for more information. 
Development
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith
EH22 3AA
housing.enquiries@midlothian.gov.uk
Telephone: 07808 903454 
Equality Impact Assessment (EIA) and Strategic Environmental
Assessment
Midlothian Council is committed to ensuring equality of opportunity and combating
discrimination through a series of equal opportunities and anti-discriminatory policies.
The Council has embedded equalities principles into strategic planning as well as
service delivery. Housing policies and services are regularly monitored, reviewed and
reported on to ensure that they comply with equalities requirements. 
An Integrated Impact Assessment (IIA) has been undertaken for this Strategic
Housing Investment Plan and can be found here: 
Housing strategy and performance | Midlothian Council 
Page 143 of 260

Page 144

Appendix 1: SHIP Project Tables 
Table 1 - AFFORDABLE HOUSING SUPPLY PROGRAMME 2027/28-2031/32 
The table below is a photo image and as such is not accessible to everyone. The original Strategic Housing Investment Plan 2027/28
– 2031/32 (in excel format) can be found here: 
Housing strategy and performance | Midlothian Council 
Page 144 of 260

Page 145

Page 145 of 260

Page 146

Page 146 of 260

Page 147

Midlothian Council
Tuesday 22 September 2026
Item No 8.6   
Midlothian Council’s Housing Services Assurance Statement 2026 
Report by Kevin Anderson, Executive Director Place 
Report for Decision 
1 Recommendations
Council is recommended to approve the Annual Assurance Statement
(AAS) attached at Appendix 1 for submission to the Scottish Housing
Regulator by 31 October 2026 and authorise the signing off the
statement by the Cabinet Member for Housing. 
2 Purpose of Report/Executive Summary
To seek Council approval to comply with the Scottish Housing
Regulator’s (SHR) Regulatory Framework, and in particular, the
requirement for the Council to produce an AAS each year, providing
assurance that it is meeting legislative and regulatory standards for
social housing in Scotland during the reporting year April 2025 - March
2026. 
This AAS confirms the Council’s compliance with the Regulatory
Requirements set out in Chapter 3 of the Framework, the Scottish
Housing Charter, and relevant legislative duties and discloses one area
of non-compliance relating to the Homeless Persons (Unsuitable
Accommodation) (Scotland) Order 2014 (as amended). 
Following Council approval, the AAS will be published on the SHR and
Midlothian Council websites. 
Date 20th August 2026
Report Contact: Claire Douglas, Housing Services Manager 0131 271 6685
Email: Claire.Douglas@midlothian.gov.uk 
Page 147 of 260

Page 148

3 Background 
3.1 The Housing (Scotland) Act 2010 sets out the requirement for a Scottish
Social Housing Charter (SSHC) and the statutory objectives, functions,
duties and powers of the SHR. 
3.2 The SSHC sets the standards and outcomes that all social landlords
should aim to achieve when performing their housing activities. The SHR
monitors, assesses and reports on the SSHC. The SHR’s statutory
objective is to safeguard and promote the interests of current and future
tenants, people who are homeless, factored owners and
Gypsy/Travellers. Scottish Social Housing Charter November 2022 -
gov.scot (www.gov.scot) 
3.3 A Regulatory Framework sets out the approach to regulation. 
Regulatory Framework | Scottish Housing Regulator 
The SHR monitors, assesses, reports and intervenes (as appropriate) in
relation to Scottish social landlord performance and housing activities.
The framework requires all social landlords to submit an Annual
Assurance Statement each year, confirming compliance with the
relevant requirements of section 3 of the Framework and relevant
legislative duties. 
3.4 The statement must be approved by the governing body, or relevant
committee with delegated authority and submitted to the SHR by 31st
October each year.  Where a landlord does not fully comply with a
requirement, the Statement must set out the area of non-compliance and
the improvement actions for achieving compliance. 
4.  Assurance Statement Summary 
4.1 The Council can confirm that, with the exception noted below, it complies
with its duties, obligations and responsibilities as a social landlord,
including standards and outcomes in the Scottish Social Housing
Charter, and its statutory and legal obligations relating to housing and
homelessness, equality and human rights, tenants and resident safety
and rights of children and young people. 
4.2  The Council’s systems of control and assurance meet the Regulatory
Standards for tenant safety, including gas safety checks, electrical safety
checks, mould and dampness frameworks, legionella testing, fire safety
checks, asbestos management and lift safety. 
Area of Non-Compliance - Temporary Accommodation 
4.3 During 2025/26, pressure on temporary accommodation remained high,
with demand and supply constraints across the service.  Midlothian
Council breached the Homeless Persons (Unsuitable Accommodation)
(Scotland) Order 2014 (as amended), in relation to length of stay in
unsuitable accommodation on 30 occasions. 
4.4  The Council recognises its duties under UNCRC (Incorporation)
(Scotland) Act 2024, which came into force in July 2024, and considers
Page 148 of 260

Page 149

the impact of decisions, including those relating to temporary
accommodation, on the rights of children and young people as part of its
ongoing improvement action. 
4.5  The improvement action currently under implementation is to introduce
a new structure to support the Council’s commitment to prioritising
tenants’ safety, bringing in expertise, training and improved monitoring
and reporting.  The Council is also reviewing its housing advice and
assistance framework to promote informed housing options.  It is
expected that this will deliver a reduction in breaches. 
Equalities and Human Rights 
4.6  The Council’s compliance with quality and human rights duties is
supported by Integrated Impact Assessments undertaken on relevant
housing and homelessness policies and services, ensuring impacts on
tenants and service users are identified and addressed. 
Tenants and Resident Safety Notifications 
4.7  The Council is not aware of any reports or investigations by the Health
and Safety Executive, the Information Commissioners Office or other
regulatory or statutory authorities relating to tenant or resident safety, or
date protection concerns, during the reporting period. 
5  Evidence base 
5.1  The statement has been informed by the Council’s ongoing engagement
with tenants and service users throughout the year and is supported by
the Council’s Annual Return on Charter submission to the Scottish
Housing Regulator, which provided ongoing performance evidence
across the relevant Charter outcomes. 
5.2  Sufficient evidence has been considered, compromising a bank of
reports, policies, and advice and information, which the Council monitors
and oversees on an ongoing basis, to provide continuous assurance. 
6  Policy and Legal Implications 
6.1  The current SHR Midlothian’s Engagement Plan 2026/27 details are as
follows:  
• the provision of temporary accommodation by Midlothian to people who
are homeless; and 
• outcomes for people who are homeless. 
What Midlothian must do: 
• Send information in relation to its homelessness service;
• Report emerging issues preventing it from fulfilling its statutory duty to
provide temporary accommodation when it should and comply with the
Unsuitable Accommodation Order; and
• Improve its emergency repairs performance and tell us when it has
delivered the necessary improvements. 
Page 149 of 260

Page 150

6.2 Failure to submit an Annual Assurance Statement, or submission of a
Statement that doesn’t not accurately reflect the Councils level of
compliance, may result in further regulatory engagement.   
6.3  The Council has an ongoing statutory duty to notify the SHR of any
material changes to the level of assurance set out in its statement during
the year, whether this represents improvement or non-compliance. 
Report Implications (Resource, Digital and Risk) 
7.1 Resource 
There are no additional resource implications related to this report. 
7.2 Digital 
None 
7.3 Risk 
The evidence bank combines reports, policies, advice and information
which the Council monitors and oversees on an ongoing basis through
the year to provide continuous evidence that our landlord duties are
compliant and assurance with safety requirements. 
7.4 Ensuring Equalities (if required a separate IIA must be completed) 
An IIA is not required as this report doesn’t not affect the wellbeing of
the community or have a significant impact on equality and human
rights; tackling socio economic disadvantage and poverty; climate
change, the environment and sustainability; the Council’s role as a
corporate parent, or the storage/collection of personal data.  The
statement will be published on the SHR website and the Council
website. 
7.5 Appendices 
Appendix 1 – Annual Assurance Statement
Appendix 2 – Annual Assurance Statement Assessment of Compliance   
Page 150 of 260

Page 151

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Delivering housing services in accordance with legislation, regulatory
standards and best practice guidance contributes to reducing the gap
in health outcomes and economic circumstances.  Improving the quality
of life for Midlothian’s citizens and safeguarding housing assets for
future generations. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value
The AAS supports the delivery so that tenants and other customers
receive services that provide best value for money for the rent and
other service charges they pay. We continue to secure continuous
improvement in performance while maintaining an appropriate balance
between quality and cost. 
A.5 Involving Communities and Other Stakeholders 
Information sharing and consultation takes place with the Midlothian             
Tenants Panel. The AAS will be made available on the Council’s             
website along with the SHR’s Landlord Performance Report and             
Engagement Plan. 
A.6 Impact on Performance and Outcomes 
The SHR requires all social landlords to submit an AAS providing and
evidencing assurance. 
Page 151 of 260

Page 152

A.7 Adopting a Preventative Approach 
Not applicable. 
A.8 Supporting Sustainable Development 
Not applicable. 
Page 152 of 260

Page 153

Place Directorate 
Midlothian Council
Midlothian House
40-46 Buccleuch Street
Dalkeith Kevin Anderson
EH22 1DN Executive Director Place   
Midlothian Council Annual Assurance Statement 2026 
Midlothian Council confirms to its tenants and the Scottish Housing Regulator that
it complies with its duties, obligations and responsibilities placed on landlords set
out in Chapter 3 of the Scottish Housing Regulatory Framework, except as set out
below. This includes that we: 
• Achieve the standards and outcomes set out in the Scottish Social
Housing Charter for tenants, people who are homeless and others who
use our services; 
• Comply with our statutory and legal obligations related to housing and
homelessness, equality and human rights and tenants and resident safety. 
We confirm our systems of control and assurance meet the Regulatory Standards
for tenant safety in, gas safety checks, electrical safety checks, mould and
dampness frameworks, legionella testing, fire safety checks, asbestos
management and lift safety.   
Area of Non-Compliance: 
During 2025/26, pressure on temporary accommodation remained high, with
demand and supply constraints. Midlothian Council breached the Homeless
Persons (Unsuitable Accommodation) (Scotland) Order 2014 (as amended) in
relation of length of stay in unsuitable accommodation, as a result of pressure on
temporary accommodation 30 times.   
The improvement action currently under implementation is to introduce a new
service structure to support our commitment to prioritising tenants needs, bringing
in resource, expertise, training, improved monitoring and reporting.  We are also
reviewing our housing advice and assistance framework to promote informed
discussion of housing options at an early stage for those at risk of homelessness. 
Tenant and Resident Safety Notifications: 
We confirm we are not aware of any reports or investigations by the Health and
Safety Executive, the Information Commissioner’s Office, or other regulatory or
statutory authorities relating to tenant or resident safety, or data protection
concerns, during the reporting period.   
Our compliance with equality and human rights is supported by Integrated Impact
Assessments undertaken on relevant housing and homelessness policies and
services, ensuing impacts on tenants and service users are identified and
addressed. 
Page 153 of 260

Page 154

Your Ref:   Tel: 0131 270 7500
Our Ref: QUOTE/22/25 Tenants Satisfaction Survey  www.midlothian.gov.uk 
We recognise our duties under the UNCRC (Incorporation) (Scotland) Act 2024
and consider the impact of decisions on the rights of children and young people. 
I can confirm I have considered sufficient evidence, which consists of Annual
Return on the Charter submission to the Scottish Housing Regulator, a bank of
reports, policies, advice and information which the Council monitors and oversees
on an ongoing basis, to provide continuous evidence and which, to the best of my
knowledge and belief, gives assurance of compliance with the Regulatory
Framework. 
We will notify the Scottish Housing Regulator of any material changes to the
assurance set out in this Statement during the year. 
We approved our Annual Assurance Statement at the Council meeting held on 
22 September 2026. 
Signed: 
Date of Signing: 
Councillor Stuart McKenzie, Cabinet Member for Housing Services
Page 154 of 260

Page 155

Appendix 2
Assured
Scottish Housing Regulator (SHR) - Annual Assurance Statement
(AAS) Assessment of Compliance
Gas safety checks, electrical safety checks, mould and dampness frameworks, legionella
testing, fire safety checks, asbestos management and Lift safety
Subject/Issue SHR Requirement Status Evidence Contact Actions
Annual Return of the Charter (ARC) and EESSH ARC return 2025/26 - Midlothian Council | Scottish Housing Regulator Fiona Clandillon Upload May.  Updating monthly EICRs.
Annual Assurance statement by 31st October
Executive Director meets Cabinet member for housing weekly.  Governance and
performance reporting.  As a minimum once a year we hold a housing briefing session for
elected members. Agenda and shared documents Kevin Anderson
Annual Landlord Report Report 2024/2025 Housing strategy documents | Landlord report to tenants 2024-25 Claire Douglas
Housing Statistics Return to Scottish Government Scottish Government Annual Return Housing statistics - gov.scot Performance Officer
Scotland's Housing Network Returns
Scotland Housing Network (SHN) returns 2025/6.  Benchmarking against other landlords
Charter preparation - Scotland's Housing Network Performance Officer
upload annuallty in May
Regular internal performance monitoring of KPIs
Weekly and monthly KPIs. In addition to published quarterly performance data reported to
the Council's Cabinet and also the Performance, Review and Scrutiny Committee, the annual
performance report provides a comparison with other councils based on the Scottish
Housing Network's peer group system. The report compares the Council's performance with
the Scottish average and if performance has improved or deteriorated over the previous
year. A narrative is provided highlighting key points and identifies areas for improvement.
F: Drive Performance Officer
Three yearly tenants satisfaction survey Completed December 2025.  Knowledge Partnership report. Housing strategy and performance | Midlothian Council Claire Douglas
Complaints monitoring and handling Complaints handling - Granicus system Complaints procedure | Midlothian Council Performance Officer
Financial monitoring and reporting Quarterly forecasting and monitoring Quarterly reports to Council Finance lead
Ongoing investment in expansion of affordable housing stock Monitoring of affordable homes budget and spend Housing Board Fiona Clandillon
Ongoing investment in housing stock condition Monitoring of asset condition Stock condition surveys Fiona Clandillon
Estate safety group Monitoring risk Monthly meetings Chief Officer Place
Care inspectorate review and report Supported accommodation units managed by our contractor Care Support Scotland. Care services Claire Douglas
Management of public protection matters through MAPPA process Housing involvement and attendance at meetings. MAPPA meetings - Guidance & Protocols Claire Douglas
Strategic Housing Investment Plan (SHIP) Strategic Housing Investment Plans (SHIP) Strategic Housing Investment Plans (SHIP) Housing Strategy Officer
Regular contract meetings Monthly, quarterly and 6 monthly supplier performance meetings F Drive Claire Douglas/Alan Ramage
Business continuity plan Per service reports to DMT F Drive Claire Douglas/Alan Ramage/Charles Savage
Risk register Per service on Pentana Pentana Claire Douglas/Alan Ramage/Charles Savage
Data protection, equalities and human rights Per service data systems.  Includes DPIAs and integrated impact assessments Search results | Midlothian Council Claire Douglas/Alan Ramage/Charles Savage
Tenant Participation TP Strategy 2024-27. Rent Review Strategy and consulation Tenant participation | Midlothian Council Claire Douglas
Rapid Rehousing Transition Plan Rapid Rehousing Transition Plans Rapid Rehousing Transition Plans Matthew Mcglone
SHR engagement plan
Website -
http://www.midlothian.gov.uk/info/917/housing/323/housing_strategy_and_performance
Landlord performance | Scottish Housing Regulator Fiona Clandillon
Health and Safety Spheracloud risk assessments and maintenence data management systems Claire Douglas/Alan Ramage/Charles Savage
Information on significant performance failures Housing performance reporting Housing strategy and performance | Midlothian Council Fiona Clandillon / Performance Officer
Data collection of protected characteristics Recorded on ONE housing Tenancy management One housing system Performance Officer
Tenant safety
Gas safety checks, electrical safety checks, mould and dampness frameworks, legionella
testing, fire safety checks, asbestos management and Lift safety
We work in partnership with Police Scotland and the Scottish Fire and Rescue Service on
tenant and resident safety (e.g. joint fire safety inspections, Multi Agency meetings and
community initiatives).  Our Gas team supported by contractors carry out gas repairs,
servicing and gas safety checks.   Asbestos is managed through current procedures and
allocated to an asbestos contractor. All lifts are serviced regularly, timescales are
depending on type and age. Water Hygiene testing is carried out as required.  Electrical
Safety register.  Mould and dampness framework. Alan Ramage
Health and Safety reports
Notify the SHR of any tenant and resident safety matters which have been reported to, or are
being investigated by, the Health and Safety Executive, or reports from regulatory or
statutory authorities, or insurance providers, relating to safety concerns.
No health and safety matters have been required to be reported to the Health and Safety
Executive in the last 12 months.
Fiona Clandillon
Whistleblowing policy
Have effective arrangements and a policy for whistleblowing by staff and elected members,
which it makes easily available and which we promote through staff newletter.
The Council's Whistleblowing Policy is currently under review as was last updated 17th
August 2018. Details are available for staff on the Council's intranet site. 
Policies in respect of fraud, corruption and bribery are also available to members of the
public on the Council's website and staff undertake mandatory eLearning training. Concerns
can be reported by telephone and email.
https://www.midlothian.gov.uk/forms/form/57/en/report_a_possible_crime_fraud_or_similar_
concern
Fiona Clandillon
Material changes Advise SHR, of material changes.  Notification of statutory or insurance safety concers. Fiona Clandillon
Internal Audit Rent compliance
Started March 2026 however there are regular audits of aspects of the housing services Fiona Clandillon
Gypsy Traveller No site available for G/T at present Fiona Clandillon
Page 155 of 260

Page 156

Page 156 of 260

Page 157

Midlothian Council
Tuesday 22 September 2026
Item No 8.7 
All Through School and its Associated Catchment Areas at Shawfair Consultation
Report 
Report by Derek Oliver, Executive Director Children, Young People & Partnerships 
Report for Decision 
1 Recommendations
Council is recommended to approve the following: 
• New primary and secondary school catchment areas will be established for the
proposed Shawfair 2-18 Education Campus, and the catchment areas of Danderhall
Primary School, and Dalkeith High School will be realigned; 
• A new all through school with early learning, primary and secondary learning, and
specialist additional support needs (ASN) provision will be established for the
proposed Shawfair 2-18 education campus catchment area; 
• The new all through school will open on its permanent site on the completion of the
new building in August 2028 or as soon as possible thereafter; 
• A realignment of the Danderhall Primary School Catchment Area and Dalkeith High
School Catchment Area from August 2027. 
2 Purpose of Report
This report advises the outcome of the statutory consultation on the proposal to 
establish a new all through school and its associated catchment areas within the land at
Shawfair and to realign the catchment areas of Danderhall Primary School and Dalkeith
High School, and seeks approval for the recommendations outlined above. The
statutory consultation on the proposal began on Thursday 26 March 2026 and ended on
Wednesday 27 May 2026. The statutory report on the outcome of the consultation was
published on Monday 31 August 2026 and provides full details of the process
undertaken, representations made and His Majesty’s Inspectorate of Education in
Scotland (HMIES)’s independent report on the proposal.
Date:  Thursday 20th August 2026 
Report Contact: Katy Maclean, katy.maclean@midlothian.gov.uk
Derek Oliver, Executive Director Children, Young People & Partnerships
Page 157 of 260

Page 158

3 Background 
1. The Education (Scotland) Act 1980 places a legislative duty on the Council to make
adequate and efficient provision of school education across its area. This duty applies
in respect of both the current school population and anticipated pattern of demand. 
2. Section 3D of the Standards in Scotland’s Schools etc. Act 2000 (as inserted by
Section 2 of the Education (Scotland) 2016 Act) introduces a requirement on education
authorities to carry out their duty to ensure the delivery of improvement in the quality
of school education, which is provided in the schools they manage, with a view to
achieving the strategic priorities of the National Improvement Framework. It is,
therefore, the duty of the education authority to ensure that the education it provides
is directed to the development of the personality, talents and the mental and physical
abilities of the children to their fullest potential. 
3. In addition, Councils have a statutory duty to secure best value in terms of the Local
Government in Scotland Act 2003 by continuous improvement in performance of the
local authority’s functions, while maintaining an appropriate balance between quality
and cost and having regard to economy, efficiency, effectiveness, equal opportunities
and the achievement of sustainable development. 
4. The statutory consultation on the proposal began on Thursday 26 March 2026 and
ended on Wednesday 27 May 2026. The statutory report on the outcome of the
consultation was published on Monday 31 August 2026 and provides full details of the
process undertaken, representations made and His Majesty’s Inspectorate of
Education in Scotland (HMIES)’s independent report on the proposal. The report is
available on the Council’s Citizen Space Consultation page: Shawfair 2-18 Education
Consultation - Midlothian Council - Citizen Space 
5. The Education Service held a Public Meeting at Danderhall Primary School on
Thursday 21 May 2026. Six members of the public attended the public meeting. 
6. The Education Service held two Pupil Voice sessions, one at Danderhall Primary
School on Tuesday 19 May 2026, and one at Dalkeith High School on Monday 
25 May 2026. 
7. One member of the public attended a virtual drop-in session, which were available on
Tuesday 12 May 2026, and Thursday 14 May 2026. 
8. A total of 321 responses to the consultation were received during the period of the
statutory consultation. 
Page 158 of 260

Page 159

9. 87.2% responses to the consultation were in favour of the proposal to establish a new
all through school with early learning, primary and secondary learning, and specialist
additional support needs (ASN) at Shawfair, while 10.0% were not in favour and 2.8%
had no opinion or did not answer the question.  
10. 88.5% of responses to the consultation were in favour of the proposal to create new
primary and secondary school catchment areas for the proposed Shawfair 2-18
Education Campus, 7.5% were not in favour and 4.0% had no opinion or did not
answer the question. 
11. 82.9% of responses to the consultation were in favour of the proposal to realign the
catchment areas of Danderhall Primary School, and Dalkeith High School, 10.0% were
not in favour, and 7.2% had no opinion or did not answer the question. 
12. His Majesty’s Inspectorate of Education in Scotland (HMIES)’s (HM Inspectors)
prepare a report in accordance with the terms of the Schools (Consultation)
(Scotland) Act 2010 (“the 2010 Act”). The purpose of the report is to provide an
independent and impartial consideration of Midlothian Council’s proposal (Appendix
C). 
13. The HMIES report summary states: 
HM Inspectors agree that Midlothian Council’s proposal to build a new school at
Shawfair has potential education benefits. These include opportunities for smoother
transitions for children and young people and improved provision for those with
additional support needs. The proposal has the potential to provide an integrated
approach to the delivery of the curriculum and ease the pressure on other schools in
the area. However, HM Inspectors consider that should the proposal be approved,
the issues raised by stakeholders regarding the practical arrangements for the new
school need to be addressed. That the council should work with stakeholders to
mitigate their concerns and should ensure that staff and parents are kept fully
informed about the project progress. 
14. The consultation report was published on 31 August 2026 leaving the required
period of at least three weeks for further representations to be made prior to
Council’s consideration of the report and its decision regarding the
recommendations: 
• New primary and secondary school catchment areas will be established for the
proposed Shawfair 2-18 Education Campus, and the catchment areas of
Danderhall Primary School, and Dalkeith High School will be realigned; 
Page 159 of 260

Page 160

• A new all through school with early learning, primary and secondary learning, and
specialist additional support needs (ASN) provision will be established for the
proposed Shawfair 2-18 education campus catchment area; 
• The new all through school will open on its permanent site on the completion of
the new building in August 2028 or as soon as possible thereafter; 
• A realignment of the Danderhall Primary School Catchment Area and Dalkeith
High School Catchment Area from August 2027. 
15. The recommendation of the consultation report is for Council to approve the
establishment of a new all through school and its associated catchment areas within
the land at Shawfair and to realign the catchment areas of Danderhall Primary
School and Dalkeith High School. 
4 Report Implications (Resource, Digital and Risk) 
4.1     Resource 
1. The proposed Shawfair all-through school will be led and managed by a Head
Teacher appointed prior to the new school opening. 
2. The staffing levels will principally be determined by the number of children in the
school. 
3. New staff posts will be recruited when required following the normal Midlothian
Council recruitment procedures. We anticipate the need to recruit will be an
incremental process reflecting the increase in the school roll year by year. 
4. If this proposal is implemented, the Council does not envisage any adverse effects
from the proposal in respect of staffing. Should issues arise however, these will be
mitigated through the Council’s Education Leadership Team support structure and
HR policies. 
5. The capital cost associated with the new school building was previously agreed at
full Council. 
6. There will be a revenue cost associated with equipping the new school. 
4.2   Digital 
The school will be equipped with standard digital resources, and the pupils will be
issued with devices as agreed in our Equipped for Learning Policy. 
Page 160 of 260

Page 161

4.3 Risk 
Rapid population growth, housing development and increased placing requests have
contributed to capacity pressures at schools in the Danderhall and Shawfair area.
There is a risk that Midlothian Councill will be unable to deliver its legislative duty as
laid out in The Education (Scotland) Act 1980. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
An Integrated Impact Assessment has been carried out and published, Appendix D. 
4.4 Additional Report Implications 
See Appendix A. 
Appendices
Appendix A – Additional Report Implications
Appendix B – Consultation Report, August 2026 
Appendix C -  His Majesty’s Inspectorate of Education in Scotland (HMIES) Report
Appendix D – Integrated Impact Assessment
Appendix E – Consultation Proposal Document 
Page 161 of 260

Page 162

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan
Not applicable 
A.2 Key Drivers for Change
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value
The implementation of the recommendation of this report will enhance best value in
the delivery of Council services. 
A.5 Involving Communities and Other Stakeholders
This report provides details of the statutory consultation undertaken with
communities and all stakeholders regarding the proposal to establish a new all
through school and its associated catchment areas within the land at Shawfair and to
realign the catchment areas of Danderhall Primary School and Dalkeith High School. 
A.6 Impact on Performance and Outcomes
The report does not directly impact on Midlothian Council’s performance and
outcomes. 
A.7 Adopting a Preventative Approach
Not applicable 
A.8 Supporting Sustainable Development
Not applicable 
Page 162 of 260

Page 163

Midlothian Council
Tuesday 22 September 2026
Item No 8.8 
Education Annual Plan and Report 
Report by Derek Oliver, Executive Director Children, Young People and
Partnerships 
Report for Decision 
1 Recommendations 
• Note the statutory duties of the education authority for annual planning and
reporting.
• Approve the progress report for 2025/26 and the plan for Midlothian for 2026/27.
• Thank all those who have contributed to the successes of 2025/26.   
2 Purpose of Report/Executive Summary 
This report presents the 2025/26 Standards & Quality report and the Education
service improvement plan for 2026/27 for Council approval. 
21 August 2026 
Report Contact:
Michelle Strong
Chief Education Officer
michelle.strong@midlothian.gov.uk 
Page 163 of 260

Page 164

3 Background 
3.1 Education authority duties 
Under the provisions of the Standards in Scotland’s Schools etc. Act 2000 (section
13) places a duty on education authorities to prepare and publish annual plans.
These plans need to describe the steps taken to enhance equity and support
improvement within schools, early learning settings and across education services. 
• Education authorities must prepare and publish annual reports setting out the
steps they have taken, over the course of the planning period: 
➢ with a view to reducing inequalities of outcome experienced by pupils as a
result of socio-economic disadvantage;
➢ to comply with the duties imposed on it by section 3B(3) (to seek and have
regard to the views of the persons listed in section 3B(4) and to provide any
advice and support the authority thinks appropriate to those persons in
relation to its consideration of decisions of a strategic nature about the
carrying out of its functions relating to school education, and;
➢ in pursuance of the NIF for Scottish education;
➢ the report must also set out any educational benefits for pupils that the
authority considers have resulted from taking those steps. 
Annual reports and plans must be published by 31 August each year or as soon
as possible after that date. Plans must also be shared with Scottish Ministers
once plans are published. 
As well as producing an annual report for Midlothian, the education authority is
responsible for ensuring that headteachers produce annual plans for their school
or setting. These plans are built on consultation with pupils, Parent Council,
teachers and volunteers working in the school. A summary of the plan, or an
accessible version, should be available for learners, parents and interested
parties. 
The legislation is intentionally silent on the format that annual plans/reports
should take. 
3.2 The Midlothian Plan 
The annual plan details the progress and achievements made during academic
session 2025-26 as well as the improvements planned for session 2026-27. The plan
is based on self-evaluation and consultation with stakeholders. The timelines and
impact measures are detailed throughout the plan. 
An accessible version of the plan has been produced and widely circulated 
https://read.bookcreator.com/Zv9dmRMUH1Wt8CwHD73O6oU3In32/h50eN6t8R
nOGJ8nDnfi6vA 
Page 164 of 260

Page 165

3.3 Summary of Midlothian Plan 
Key Successes and Achievements 2025-2026
Midlothian Education Service demonstrated strong progress in attainment, inclusion,
digital innovation and quality improvement during 2025-2026. Inspection evidence,
attainment data and stakeholder feedback indicate improving outcomes for learners,
a narrowing poverty-related attainment gap, increasing digital capability across the
workforce, and stronger partnerships supporting children and young people. 
Inspection Outcomes
• Education Scotland inspections reported strong performance across Midlothian
schools, with most evaluations rated Good or Very Good.
• Rosewell Primary School achieved Very Good evaluations in leadership,
learning, teaching, wellbeing and inclusion.
• King's Park Primary School achieved Very Good ratings in leadership, wellbeing
and attainment.
• Newbattle High School was recognised as having the capacity to continue
improving, with no further inspection visits required.
• Across Early Learning and Childcare settings, 93% of funded children attended
settings graded Good or better, an increase of 3% from the previous year. 
Raising Attainment and Reducing the Poverty-Related Gap
• The 2025 Broad General Education attainment results were the strongest on
record.
• Scottish Government stretch aims were achieved in: 
o Primary Literacy (76.6%)
o Primary Numeracy (80.2%)
o S3 Literacy (89.7%)
o S3 Numeracy (93.9%)
• Secondary attainment improved across most measures, with literacy and
numeracy outcomes consistently above virtual comparator averages.
• The poverty-related attainment gap narrowed significantly in primary literacy and
numeracy, reaching its lowest post-pandemic levels 
Inclusive Learning and Support
• The enhanced collaboration between the Raising Attainment Team, schools and
Early Years settings strengthened inclusive learning, teaching and assessment.
• Over 98% positive feedback was received for professional learning in writing.
• New dyslexia guidance led to a 26.8% increase in identified learners, improving
support and consistency for families and schools.
• Learner Voice Groups helped shape the refreshed concept of "A Midlothian
Learner 2.0". 
Digital Innovation
• Nearly 500 teachers participated in a generative AI pilot programme.
• AI tools were introduced to school leaders to reduce workload and support
improvement planning.
• 314 support staff received iPads and associated training.
• All primary pupils completed a digital learning programme, with 97.8% reporting
they learned something new.
• Digital practice was recognised as a strength in 100% of HMIE inspections
during the year.
• The Equipped for Learning programme was showcased internationally at BETT
2026. 
Page 165 of 260

Page 166

Leadership and Workforce Development
• Secondary and primary leadership networks strengthened collaboration and
consistency in learning, teaching and assessment.
• Professional learning continued to receive approval ratings above 90%. 
Wellbeing, Inclusion and Participation
• A new Relationships for Learning Policy was implemented across all settings.
• Youth Cabinet and School Parliament participation expanded to almost all
schools, strengthening learner voice in decision-making.
• GIRFEC and partnership frameworks were refreshed to improve consistency of
support for children, young people and families.
• Attendance improvement initiatives and mentoring programmes showed positive
impacts on engagement and relationships. 
3.4 Priorities for 2026/27 
Midlothian education service is committed to ensuring all our children and young
people    are supported to be the best they can be.  2026-27 is the final year of 4-
year plan to improve the attainment and achievement of learners.   
We will be focused on:
• Ensuring high-quality provisions promote engagement and improved outcomes
• We build a confident workforce that promotes leadership at all levels
• Individuals, schools and ASG are data-informed and use this to make decisions
• The curriculum at all stages is inclusive, relevant and inspiring
• Relationships are positive and respectful
• Learners are equipped with skills for aa digital world
• Children and young people are fully engaged in decisions that affect them 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
Resource implications have been considered and identified during individual Service
Plan development 
4.2 Digital 
Specific Digital issues are considered within individual Service Plans as appropriate. 
4.3 Risk 
This report seeks to ensure that the Council and partners have strategic and
sustainable plans for future service delivery. Chief Officers will consider, on an
ongoing basis, possible risk exposures to the successful achievement of all priorities. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
4.5 Additional Report Implications (See Appendix A) 
See Appendix A 
Page 166 of 260

Page 167

Appendices 
Appendix A – Additional Report Implications
Appendix B – Education Service Plan 2026/27 
Page 167 of 260

Page 168

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
The Single Midlothian Plan informs all Service Plan activity with a key requirement
that all plans demonstrate the services contribution to the SMP outcomes and
priorities. 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
Service Plans identify activities which deliver across the key drivers for change
streams. 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
Service Plans identify activities which deliver across the key delivery streams. 
A.4 Delivering Best Value 
Service Plans demonstrate the services delivery of Best Value and provide the basis
for ongoing oversight and management of Best Value duties. 
A.5 Involving Communities and Other Stakeholders 
Service Plans demonstrate the services contribution to the SMP outcomes and
priorities which are identified following a range of consultation and engagement
activities with communities and stakeholders. 
A.6 Impact on Performance and Outcomes 
Service Plans demonstrate the services contribution to the SMP outcomes and
priorities and will provide the basis for ongoing performance management. 
Page 168 of 260

Page 169

A.7 Adopting a Preventative Approach 
All plans consider the adoption of a preventative approach to service delivery. 
A.8 Supporting Sustainable Development 
The development of the Single Midlothian Plan and Service Plans represent a robust
approach to supporting sound planning of council services. 
Page 169 of 260

Page 170

APPENDIX B – 
Education Service Plan 2026/27 
CLLE Annual Reports - CLLE annual reports
Page 170 of 260

Page 171

Page 1 of 39 
OFFICIAL 
Education Service Improvement Plan 2026-2027 
Improving Outcomes for Learners through an Empowered System 
Derek Oliver
Executive Director Children, Young People and Partnerships
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith
EH22 3ZG
Page 171 of 260

Page 172

Page 2 of 39 
OFFICIAL
Table of contents 
Section 1: Introduction ....................................................................................................... 4
1.1 Our Children, Young People & Partnerships Directorate Vision ............................................................ 4
1.2 Our Education Service Priorities ............................................................................................................ 4
1.3 Improvement Drivers .............................................................................................................................. 4
1.4 Our Improvement Outcomes .................................................................................................................. 5
2.1 Our Context............................................................................................................................................ 5
Ethnicity 5
• 9.6% of young people in schools in Midlothian were from a minority ethnic group. ............................. 5
Attainment .................................................................................................................................................... 6
• In 2025, Midlothian’s average attainment levels were in line or above the Virtual Comparator at the
end of S4, S5, and S6. ................................................................................................................................. 6
• The rate per 1,000 of Looked after Children in Midlothian is 7.9, below the national average of 12.1.
This has been decreasing since 2018. ......................................................................................................... 6
Source: Midlothian Profile (2025) ................................................................................................................. 6
• The rate per 1,000 of children on the Child Protection Register is 3.7 in Midlothian, with a national
average of 2.3. The rate in Midlothian is higher than our comparator Councils. ........................................... 6
Source: Midlothian Profile (2025) ................................................................................................................. 6
Exclusions .................................................................................................................................................... 6
• During 2024/25, there were 293 temporary exclusions in Midlothian schools. This is equivalent to 20
incidents per 1,000 pupils. ........................................................................................................................... 6
Section 3: Key Successes and Achievements (2025-2026) Evidence for the Education Service Improvement Plan evidence is gathered
through:   8
3.1 Inspections ............................................................................................................................................. 8
Education Scotland inspections 2025-2026 ................................................................................................. 8
Primary 9 
10
National Thematic Inspection Visits from Education Scotland ................................................................... 10
Early Learning and Childcare settings - Care Inspectorate and HMIE Inspections .................................... 10
Twelve early years settings were inspected by the Care Inspectorate and HMIE in session June 2025 – June 26. A range of funded providers were inspected including
private nurseries and local authority settings. “A quality improvement framework for the early learning and childcare sectors” is now being used by both Care
Inspectorate and HMIE to inspect Early Learning and Childcare settings.................................................. 10
3.2 Evaluation of Education Service Improvement Priorities ...................................................................... 13
Page 172 of 260

Page 173

Page 3 of 39 
OFFICIAL
3.3 Use of digital tools to enrich, enhance and improve learning, teaching and assessment .................... 16
Expected outcomes 2025-2026 ................................................................................................................. 18
From workstream 1 18
Expected outcomes 22
2025-2026 22
From workstream 2 22
Section 4: Education Service Improvement Plan 2026-2027 .......................................... 25
APPENDIX 1 ...................................................................................................................... 29
APPENDIX 2 ...................................................................................................................... 36 
Page 173 of 260

Page 174

Page 4 of 39 
OFFICIAL
Section 1: Introduction 
1.1 Our Children, Young People & Partnerships Directorate Vision is:
All children, young people, adults, and communities in Midlothian are supported to be the
best they can be. This will be achieved through a nurturing, respectful and collaborative
approach that promotes wellbeing, equity, inclusion, and lifelong learning. 
1.2 Our Education Service Priorities
The Education Service Improvement Plan is a forward planning document and details how
the Education Service contributes to the delivery of Midlothian Council and National Improvement Framework priorities. These
priorities include: 
Fig 1 Scottish National Improvement Framework Outcomes 
Scottish National Improvement Plan priorities
Our National Improvement Framework 2026 outcomes are outlined in Figure 1 and our
Education Service Plan takes account of these and the national wellbeing indicators: safe,
healthy, achieving, nurtured, active, respected & responsible. 
Midlothian Single Plan priorities:
Individuals and communities have improved health and skills for learning, life, and work. 
No child or household living in poverty. Significant progress is made towards net zero carbon
emissions by 2030. 
Midlothian Education Service outcome:
We will raise attainment and achievement to ensure that all children and young people in
Midlothian achieve outcomes which lead to positive and sustained destinations. 
1.3 Improvement Drivers
Our Service Improvement Plan has 3 drivers for improvement:
Page 174 of 260

Page 175

Page 5 of 39 
OFFICIAL
• Getting It Right For Every Child
• Inclusive Learning, Teaching, Assessment & Curriculum
• Leadership At All Levels 
1.4 Our Improvement Outcomes 
Quantitative measures are given in section 3 below. We want to achieve the following.
• Children and young people have improved attainment and achievement and reach ambitious outcomes. 
• Children and young people will feel fully engaged in decisions that affect them. 
Children and young people receive their entitlement to high-quality universal provision which promotes engagement and
improved outcomes.   
• Children and young people benefit from a skilled and confident workforce promoting leadership at all levels to deliver
excellent learning, teaching & assessment for all learners, in line with professional standards.  
• Children and young people experience, and contribute to, positive, respectful relationships within a culture of dignity and
respect. 
• Children and young people benefit from data-informed ASGs collaborating with partners to improve outcomes for all 3-18
learners.
• Children and young people are equipped with skills to navigate and thrive within a rapidly evolving digital landscape
• Children and young people benefit from an inclusive and relevant curriculum, that prepares them for their future. 
Section 2:  Midlothian’s Demographic Context
2.1 Our Context
Pupil numbers
• 2262 children attend funded Early Learning and Childcare
• 8131 pupils attend Primary Schools 
• 6202 pupils attend Secondary Schools 
• 100 pupils (Saltersgate) attend Special Education (Saltersgate) 
Source: Summary Statistics for Schools in Scotland (2025) 
Ethnicity
• 9.6% of young people in schools in Midlothian were from a minority ethnic group. 
Page 175 of 260

Page 176

Page 6 of 39 
OFFICIAL
Source: Summary Statistics for Schools in Scotland (2025) 
Young Carers
• There are 515 young carers (aged 5 – 18 years) registered in Midlothian Schools. 
Source: Midlothian Young Carers Project 
Attainment
• In 2025, Midlothian’s average attainment levels were in line or above the Virtual Comparator at the end of S4, S5, and S6.
Source: Insight 
Child Protection
• The rate per 1,000 of Looked after Children in Midlothian is 7.9, below the national average of 12.1. This has been decreasing since
2018. 
Source: Midlothian Profile (2025) 
• The rate per 1,000 of children on the Child Protection Register is 3.7 in Midlothian, with a national average of 2.3. The rate in Midlothian
is higher than our comparator Councils.
Source: Midlothian Profile (2025) 
Disabilities
• 483 pupils are assessed and/or declared as having a disability or long-term health condition. 
Source: Midlothian Profile (2025) 
Exclusions
• During 2024/25, there were 293 temporary exclusions in Midlothian schools. This is equivalent to 20 incidents per 1,000 pupils.
Source: SEEMIS 
Poverty
Page 176 of 260

Page 177

Page 7 of 39 
OFFICIAL
• 23% of pupils live in poverty after housing costs.
Source: End Child Poverty – Child Poverty After Housing Costs 2015-2023 (Published June 2024) 
• 74.9% of primary pupils are registered for free school meals.
Source: Summary Statistics for Schools in Scotland (2025) 
• 13.7% of secondary pupils are registered for free school meals. 
Source: Summary Statistics for Schools in Scotland (2025) 
Participation
• 93.9% annual participation rate for 16-19 year olds.
Source: SEEMIS 
Additional Support Needs
• 45.8% of pupils have a recognised additional support need.
Source: Summary Statistics for Schools in Scotland (2025) 
Page 177 of 260

Page 178

Page 8 of 39 
OFFICIAL
Section 3: Key Successes and Achievements (2025-2026)
Evidence for the Education Service Improvement Plan evidence is gathered
through:  
• Education Scotland inspection reports.
• Care Inspectorate reports.
• Quality Improvement activities, including
− School improvement planning and reporting
− Analysis of data
− Direct observation
− Gathering staff, parent/carer and young people’s views. 
3.1 Inspections 
Education Scotland inspections 2025-2026 
School  Leadership of
change 
Learning, teaching &
assessment 
Ensuring
wellbeing,
equality &
inclusion 
Raising attainment &
achievement / securing
children’s progress
Rosewell Primary School Very Good Very Good Very Good Good
St David’s RC Primary School Good Good Good Good
Tynewater Primary School  Very Good  Very Good
King’s Park Primary School Very Good Good Very Good  Very Good
Cuiken Primary School Nest Education Scotland is confident the Complex Needs provision at Cuiken Primary (the NEST) 
has the capacity to improve – report published on Education Scotland website on Tuesday 23
June here.
Newbattle High School Progress Report Education Scotland is confident the school has the capacity to continue to improve and will make
no further visits in connection with the 2023 inspection. 
Education Scotland inspection ELC    
ELC setting  Curriculum  Learning, Teaching and Assessment  Inclusion and Equality
Page 178 of 260

Page 179

Page 9 of 39 
OFFICIAL
Tynewater Primary ELC Satisfactory    Satisfactory                     Satisfactory 
King’s Park Primary ELC  Very Good  Good  Very Good 
Care Inspectorate and Education Scotland ELC inspections 
ELC setting Saff skills, knowledge, values
and deployment
Learning, teaching and
assessment    
Nurturing care and
support   
Children’s progress   
Rosewell Primary ELC Very good Good Good Good 
The following key strengths were indicated by the inspection teams. 
Primary
• Children who are polite, happy, kind, respectful, friendly, hard-working and
engage well in their learning. Children who are proud of their school. 
• Children learning through play, developing independence and creativity. 
• Staff understanding of children’s needs. Staff taking effective action to remove
barriers for children and families. Positive, warm relationships. 
• Improving attendance.
• Staff supporting children with complex needs to improve communication. 
• Staff support to improve outcomes for children with additional support needs. 
• Staff improving the teaching of reading. Staff who are enthusiastic to lead change to improve outcomes for children and
young people. Improving consistency in teaching.
• Staff creating a strong digital culture and children developing digital skills. 
• Headteacher leadership, culture of continuous improvement, collaborative approaches to leading change. 
Secondary
• Staff creating a welcoming and nurturing environment where young people feel safe, respected and included.
Page 179 of 260

Page 180

Page 10 of 39 
OFFICIAL
• Clear lines of communication between staff, young people and their families. This enables families to be more involved in
their child’s education and helps staff to address successfully any issues that young people are experiencing.
• Staff identifying and meeting young people’s needs and helping them to improve their social skills. They support young
people to have a more positive approach to education which is improving attendance and achievement. 
National Thematic Inspection Visits from Education Scotland  
• Mauricewood Primary School participated in the National Thematic
Review of Literacy and English. The report can be viewed here. 
Early Learning and Childcare settings - Care Inspectorate and HMIE
Inspections
Twelve early years settings were inspected by the Care Inspectorate and HMIE in
session June 2025 – June 26. A range of funded providers were inspected including
private nurseries and local authority settings. “A quality improvement framework for the
early learning and childcare sectors” is now being used by both Care Inspectorate and HMIE to inspect Early Learning and Childcare settings. 
The settings that were inspected in this period were:  
Local Authority Settings:
Service Name Town date of inspection
Burnbrae Primary School Nursery Bonnyrigg 09/09/2025
Rosewell Primary School Nursery Rosewell 08/12/2025
Bonnyrigg Primary School Nursery Class Bonnyrigg 15/12/2025
Mauricewood Primary School Nursery Penicuik 26/01/2026 
Page 180 of 260

Page 181

Page 11 of 39 
OFFICIAL
Funded Provider Settings:
Service Name Town date of inspection
Gorebridge FLC -  Small Steps  Gorebridge 20/06/2025
Pinocchio's Children's Nursery Lasswade Bonnyrigg 24/07/2025
Start Bright Nursery Bonnyrigg Bonnyrigg 08/08/2025
Penicuik Family Learning Centre Penicuik 10/10/2025
Hopefield Castle Nursery Bonnyrigg 14/10/2025
LASC Childcare Services Ltd (Rosewell) Rosewell 03/11/2025
Little Hawthorn Loanhead Loanhead 09/03/2026 
Summary of inspection grades                   
Quality Indicator from June 22 – Sept 25 Total no. of
settings
inspected  Excellent Very good Good Adequate Weak Unsatisfactory
1.1 Nurturing care and support 5  1 3 1    
1.3 Play and learning 5   1 3 1    
2.2 Children experience high quality facilities 5   2 2 1    
3.1 Quality assurance and improvement are led
well 5   2 2 1    
4.3 Staff deployment 5   3 1 1      
Page 181 of 260

Page 182

Page 12 of 39 
OFFICIAL
Quality Indicator from Oct 25 Total no.
of settings
inspected 
Excellent Very
good Good Adequate Weak Unsatisfactory Not
Assessed
Leadership and management of staff and
resources 7  2 4 1      
Children thrive and develop in quality spaces 7     2       5
Children play and learn 7   1 6        
Children are supported to achieve 7   2 5       
The following common key strengths were indicated by the inspection teams.  
1. Nurturing Care and Relationships
• Children consistently experience warm, responsive, and respectful interactions
• There is evidence of strong attachment, emotional wellbeing, and an inclusive ethos
• Children feel safe, secure, valued and supported 
2. Inclusive Practice and Wellbeing aligned with the GIRFEC principles
• Effective support for children with additional needs
• There is evidence of personalised, trauma-informed approaches 
• Strong focus on dignity, independence and participation 
3. Child Engagement and Play-Based Learning
• High levels of child-led play, independence and creativity
• Responsive planning approaches developing across settings
• Rich experiences supporting curiosity and collaboration 
Page 182 of 260

Page 183

Page 13 of 39 
OFFICIAL
4. Positive Relationships with Families
• Families feel welcomed, valued and confident in staff
• Strong day-to-day communication and trust
• Increasing opportunities for engagement and participation  
This session, 93% of the children accessing funding were attending settings that had at least good evaluations across the key
inspection themes. This is an increase of 3% from 2024/25. 
3.2 Evaluation of Education Service Improvement Priorities 
The Excellence and Equity Board has oversight and accountability for all outcomes
relating to the Education Service priority above. The Board is chaired by the Education
Chief Operating Officer.  
Page 183 of 260

Page 184

Page 14 of 39 
OFFICIAL 
3.2.1 We use the following outcome measures 
Last
Published
Data Feb
2026
National
Average
Stretch aims 
June 2025
Stretch aims 
June 2026
Stretch aims 
June 2027 
Stretch aims currently being updated.
ACEL P1-S3 Combined Health and Wellbeing  Not available    
ACEL P1, P4, P7 Combined Literacy  76.6% 74.5% 73.00% 76.00% 77.50%
ACEL P1, P4, P7 Combined Numeracy  80.2% 80.3% 79.00% 82.00% 82.00%
S3 Literacy 3rd level or better  89.7% 89.8% 88.00% 90.00% 91.00%
S3 Literacy at 4th level  59.3% 63.1% 65% 71% 75%
S3 Numeracy 3rd level or better  93.9% 90.9% 93.00% 94.00% 95.00%
S3 Numeracy 4th level  72.0% 68.0% 66% 69% 70%
Leavers Literacy @ Level 5  82.02% 81.90% 79.50% 82.00% 83.00%
Leavers Numeracy @ Level 5  73.74% 73.43% 73.50% 75.00% 75.00%
Leavers 1+ @ Level 5  86.87% 87.97% 88.00% 90.00% 90.00%
Leavers (ASN over time) 1+ @ Level 5  78.08% 79.18% 78% 81% 82%
Leavers (Care Experienced) 1+ @ Level 5  64.29% 53.21% 79% 81% 81%
Leavers1 @ Level 6  68.79% 68.29% 64.00% 67.00% 67.00%
%   Positive Destinations  95.35% 95.67% 96.50% 98.00% 98.00%
% Initial Destination in Higher Education  38.48% 42.31% 40.00% 43.00% 45.00%
Attendance Rate Primary  94.0% 93.1% 93.50% 95.00% 95.50%
Attendance Rate Secondary  88.0% 88.4% 89.00% 91.50% 92.00%
Participation Measure 3 years post initial destination rate %  93.9% 93.3% 94.5% 96% 95%
Exclusion Rate per 1,000 Primary 9.7 4.5 (22/23
last pub) 2.00 1.50 1.00
Exclusion Rate per 1,000 Secondary 28.7 31.5 (22/23
last pub) 22.50 17.50 15.00
% of schools & ELCs with validated Good or better QI 1.1  77% Not available 84% 89% 90%
Page 184 of 260

Page 185

Page 15 of 39 
OFFICIAL
% of schools & ELCs with validated Good or better QI 1.3  72% Not available 84% 89% 90%
% of schools & ELCs with validated Good or better QI 2.3  77% Not available 77% 85% 90%
% of schools & ELCs with validated Good or better QI 3.1  74% Not available 79% 85% 90%
% of schools & ELCs with validated Good or better QI 3.2  56% Not available 69% 79% 90% 
Excellence     
Ave. (21-24) 2024/25 Target 24/25 Target 25/26 Target 26/27
Primary combined Literacy  69.5% 76.6% 73.00% 76.00% 77.50%
Primary combined Numeracy  75.6% 80.2% 79.00% 82.00% 82.00%
S3 Literacy  83.5% 89.7% 88.00% 90.00% 91.00%
S3 Numeracy  90.2% 93.9% 93.00% 94.00% 95.00%
Leavers Literacy & Numeracy @ Level 5  66.82% 70.20% 70.00% 72.00% 74.00%
Leavers 1+ @ Level 5  86.33% 86.87% 88.00% 89.00% 90.00%
Leavers 1+ @ Level 6  62.26% 68.79% 64.50% 66.00% 67.00%
% school leavers initial destination positive  95.35% 95.35% 96.50% 97.00% 98.00% 
Equity* (the poverty related attainment gap)   
Ave. (21-24) 2024/25 Target
24/25
Target
25/26 Target 26/27
Primary combined Literacy  29.2% 22.6% 24.00% 22.50% 21.00%
Primary combined Numeracy  27.1% 16.5% 22.50% 21.00% 20.00%
S3 Literacy  22.94% 23.15% 23.00% 22.00% 20.50%
S3 Numeracy  16.35% 19.97% 16.50% 16.50% 15.50%
Leavers Literacy & Numeracy @ Level 5  35.60% 32.66% 35.50% 32.50% 30.00%
Leavers 1+ @ Level 5  22.7% 23.78% 29.00% 27.50% 25.00%
Leavers 1+ @ Level 6  30.52% 31.04% 38.00% 37.00% 35.00%
% school leavers initial destination positive  5.44% 6.41% 3.0% 2.5% 2.0% 
Page 185 of 260

Page 186

Page 16 of 39 
OFFICIAL 
Secondary Schools’ attainment
In most cases, the attainment outcomes for leavers show improvement
compared to the previous year.
The percentages of school leavers achieving SCQF Level 3, 4 or 5 in Literacy
were significantly higher than the Virtual Comparator (VC). The same applies for
Level 3, 4 or 5 in Numeracy.
The percentage of leavers achieving five or more awards at SCQF Levels 5 and
6 has been consistently above the VC for the past four years, with a clear
improving trend over the past three years.
The percentage of leavers in a positive destination remains at just over 95%, in line with the national and VC figures.
* Equity measures show the attainment gap as the difference in attainment levels between pupils that are registered for free school
meal registered and those learners not registered for free school meals.   
3.3 Use of digital tools to enrich, enhance and improve learning, teaching and assessment   
The fifth year of the Equipped for Learning (EfL) digital transformation project has brought continued
progress in ensuring digital technology is used to positively impact learning, teaching and
assessment. Year Four stakeholder surveys provided a data set to inform Year Five priorities,
including an increased focus on artificial intelligence, digital safety and collaborative approaches to
digital pedagogy. Nearly 500 teachers are engaging in a generative AI tool in education pilot,
negotiated through the Equipped for Learning project. All school leaders in primary and secondary
schools are engaging with an AI research product to explore how this technology can reduce
workload for leadership teams and streamline school improvement work. This has now been
extended to middle leaders. The Equipped for Learning project was part of an international
showcase of good practice at Bett 2026, held in the ExCel Centre, London in January 2026. 314 support staff have now been equipped
with a 1:1 staff iPad, ensuring the workforce has access to technology and training to ensure best use. All primary age pupils have
undertaken a three-week package of in-class digital support, designed to support them to use technology safely and with purpose.
Page 186 of 260

Page 187

Page 17 of 39 
OFFICIAL
97.8% of pupils strongly agreed they had learned something new. 100% of HMIe inspections this session have highlighted strengths
in the effective use of digital technology. An independent research impact study is due to be published in June 2026, reviewing the
efficacy of the first five years of Equipped for Learning and showcasing practice in schools. 
Standards and Quality review of 25-26 outcomes  
Page 187 of 260

Page 188

Page 18 of 39 
OFFICIAL
Expected outcomes 2025-
2026
How do we know we achieved the workstream outcomes? (accurate at the
time of writing 
Next Steps
From workstream 1  
All learners receive their
entitlement to high-quality
universal provision (staged
intervention levels 1 & 2)
which promotes
engagement and improved
outcomes.  
• Inclusive Learning, Teaching & Assessment : The Raising
Attainment Team has strengthened collaboration with schools
and the Early Years Team, improving inclusive LTA practices
across all ASGs. Progress includes enhanced early number
sense and targeted strategies to improve writing. Professional
learning in writing has received highly positive feedback (over
98%).
• Mathematics & Numeracy: Midlothian is one of five authorities
leading work on effective maths pedagogy. Early
implementation, led by the Raising Attainment Teacher
(Numeracy), shows improved learner engagement and
participation. The University of Glasgow Spatial Reasoning
project (P4–P7, 60+ classes across 16 schools) demonstrated
above-average gains in learner progress.
• Leadership & Collaboration: Secondary DHT LTA Networks,
with primary representation, have strengthened support for
middle leaders in delivering inclusive LTA and universal
support. Improved alignment between primary and secondary
LTA Leads is supporting consistent implementation of the
Midlothian iLTA Framework.
• Learner Voice & Curriculum Development: Learner Voice
Groups contributed to shaping A Midlothian Learner 2.0, 
Review the Midlothian
Inclusive Learning,
Teaching, Assessment &
Curriculum Strategy in line
with the national
Curriculum Improvement
Cycle (CIC) as this
develops. 
Implement Year 2 of the
Core Numeracy Building
Thinking Classrooms pilot. 
Implement the Early
Reading Programme
bespoke to Midlothian 
Quality assure Meta Skills
across LTA and
Curriculum. 
Refine the Professional
Learning (PL) offer to
support highly effective
inclusive Learning,
Teaching, Assessment and
Curriculum (iLTAC)
Page 188 of 260

Page 189

Page 19 of 39 
OFFICIAL
highlighting priorities including digital learning, metaskills, and
outdoor learning opportunities.
• Dyslexia Support & Inclusion: New dyslexia guidance and
professional learning are being successfully implemented with
strong engagement from schools and parent councils. SEEMiS
registrations for dyslexia have increased by 26.8% since
August 2025, indicating improved identification. Feedback
highlights clearer processes, reduced workload, improved
consistency, and better support for families. Parent feedback
confirms a positive impact on outcomes for dyslexic learners. 
.
Review school guidance on
Interdisciplinary Learning
(IDL) in line with the CIC.   
Support settings working
on Ed Scotland Play
Pedagogy Programme. Roll
out school guidance to
support effective play
pedagogy. 
An effective assistive
technology offer tackles
digital inequity and reduces
barriers to accessing
learning.  
• 163 three-week support packages on using accessibility tools to
access and personalise learning, delivered across schools to
provide bespoke small group support for identified pupils, an
increase of 49 pupils on last quarter
• New assistive technology passports devised to enhance
transition within and between schools to ensure clarity of
hardware and software used and make training requirements
clear
• Regular updates to ASN network and Support for Learning
network to ensure staff are signposted to latest updates and
best practice guidance
• All support staff offered a 1:1 iPad and training to ensure
technology is used effectively to meet the needs of learners.
331 support staff accepted the offer and engaged with
onboarding in its first phase
Continue to review and
iterate as required. 
Maintain assistive
technology focus through
the lens of innovations like
AI to ensure this is
leveraged to maximise
impact on learning 
Page 189 of 260

Page 190

Page 20 of 39 
OFFICIAL
• Assistive technology cohort supported to ensure team around
the child is well-equipped to implement, review and iterate
technology solutions to best meet the needs of the child
• Stages of Intervention framework updated with service partners
in NHS and Sight Scotland to ensure it meets best practice and
signposts to relevant resources and guidance
• Scoping work with CALL Scotland to inform an assistive gaming
long term project, commencing in 26/27 
A skilled and confident
workforce promotes
leadership at all levels to
deliver excellent learning,
teaching & assessment for
all learners, making best use
of digital technology and in
line with professional
standard
• 532 teachers engaging in a generative AI tool in education
pilot, negotiated through the Equipped for Learning project. 
• All school leaders in primary and secondary schools are
engaging with an AI research product to explore how this
technology can reduce workload for leadership teams and
streamline school improvement work. This has now been
extended to middle leaders, totalling 143 school leaders 
• All schools engaged with professional learning offer via the
Digital Discovery brochure to ensure bespoke support at the
point of need 
• 314 support staff have now been equipped with a 1:1 staff iPad,
ensuring the workforce has access to technology and training
to ensure best use. 
• All primary age pupils have undertaken a three-week package
of in-class digital support, modelled for teachers and designed
to support pupils and staff to use technology safely and with
purpose. 97.8% of pupils strongly agreed they had learned
something new. 
Further develop a digitally-
skilled, Artificial
Intelligence (AI) literate
workforce to support
children and young people
to navigate AI. 
Update the Digital Skills
Framework to include a
new AI literacy track and a
new digital habits track,
specifically in relation to
screentime/ distraction to
better equip young people
to develop their own
boundaries around
proportionate use of
technology. 
Robust quality improvement
and quality assurance at
school & local authority level
show validated self-
• 71% of schools were “Good” or better in QI 2.3 (learning,
teaching and assessment)
• 64% of schools were graded “Good” or better for QI 3.2
(attainment and achievement)
Continue to improve the %
of schools graded “Good”
or better. 
Page 190 of 260

Page 191

Page 21 of 39 
OFFICIAL
evaluation gradings for 2.3
and 3.2 are improving. 
• School inspection results have improved
Effective use of data at all
levels shows attainment has
improved and gaps have
reduced (see Appendix 1) 
• Our June 2025 Broad General Education (BGE) results were
the best on record.
• The gap between the most and least disadvantaged learners is
reducing in the BGE. 
Continue to improve year
on year BGE attainment
results. 
Continue to improve
secondary attainment
results. 
Evaluations indicate that
professional learning is
specific and relevant to job
roles, builds confidence,
deepens knowledge,
develops skills and leads to
improved outcomes for
learners. 
• There is a 90%+ approval rating in all professional learning
feedback. 
Continue to offer high-
quality professional
learning based on job role.
Continue to ask our
workforce what training
needs exist. Integrate our
professional learning
where possible, with our
partners.
Robust school tracking and
monitoring systems that
inform universal and
targeted support offers.
• Early Learning and Childcare settings (ELCs) are tracking
learner progress. 
• Primary school dashboards are now up to date and used as
focus for termly QI data visits. 
• Secondary school dashboards are being scoped. 
• Special schools and ASN Provisions use an agreed system to
track learner progress.
• Robust attainment tracking processes are in place in all
Associated School Groups (ASGs)
• Central officer tracking of a wide range of school performance
data, supports a proportionate approach to support &
challenge. 
Ensure partner provider
ELCs are tracking learner
progress and this
information forms part of
the transition to primary
schools. Continue to
develop primary
dashboard functionality
and use for QI challenge
visits.
Decide on a secondary
dashboard solution. 
Continue to embed the
ASN tracking system. 
Page 191 of 260

Page 192

Page 22 of 39 
OFFICIAL
Quality assurance activity
evidences excellent
learning, teaching &
assessment, as defined in
the Midlothian Learning,
Teaching & Assessment
Framework.
• Inspection evidence is pointing to greater consistency and
improvement in learning, teaching and assessment. 
• 71% of schools were “Good” or better in QI 2.3 (learning,
teaching and assessment) 
Build on development of
inclusive LTA to ensure
universal offer is strong. 
Planned and responsive use
of learner voice in
improvement is evidenced
through school and local
authority pupil groups.
• Midlothian's education service now has almost all-school
engagement in our Youth Cabinet and School Parliament
approach. 
Continue to support the
Youth Cabinet and School
Parliament approach to
enable all young people to
have a voice in major
decisions about education in
Midlothian. 
Develop political education
across the curriculum. 
Pilot ASG BGE projects are
established. All ELCs,
schools and ASGs have a
revised curriculum rationale.
• All ASGs have a revised curriculum rationale.
• Almost all schools have a revised curriculum rationale.
Continue to develop curricula
in line with the national
Curriculum Improvement
Cycle. 
Expected outcomes 
2025-2026
How do we know we achieved the workstream outcomes?  Next Steps
From workstream 2  
Culture, relationships and
systems ensure that
children, young people, and
staff feel valued and
supported to succeed.     
• The Midlothian Relationships for Learning Policy was launched
in August 2025 following extensive engagement and co-
production with children, families and staff. Almost all school
staff engaged in an introductory policy briefing in August.  
• A Relationships for learning self-evaluation tool was completed
by most settings with analysis informing key actions to support
schools in the ongoing policy implementation.
• The Relationships for Learning Community of Practice met 4
times over the year with representation from almost all settings 
Strengthening of wellbeing
data analysis and
interventions at targeted and
crisis levels. 
Ongoing support for schools
in strengthening practice in
Page 192 of 260

Page 193

Page 23 of 39 
OFFICIAL
and key partners, strengthening our rights-based, relational
approach and targeted wellbeing interventions.
• Revised guidance was launched around physical intervention
in line with revised national guidance.
• Models of ‘reflecting teams’ have been trialled across a
number of settings to support staff in complex decision-making
and promoting staff wellbeing with very positive feedback.
• Our new Pupil Leadership Structure continues to become
embedded, ensuring user voice groups represent the children
and young people of Midlothian. 
• A partnership with Enquire has involved professional learning
for EPs, ASN central team and principal teachers on promoting
the meaningful participation of children with complex needs in
decisions that affect them. 
de-escalation and post-
incident support in line with
guidance. 
Continue to embed the role
of the pupil parliament
within strategic decision
making. 
Roll out of professional
learning on the meaningful
participation of children with
complex needs in planning
and decision making.
Collaboration, partnerships
and shared learning at ASG
level leads to an
improvement in learner
outcomes through a data-
informed allocation of
resources.   
• Following consultation, we reviewed and clarified the purpose
of the Executive Education Group (EEG). The refreshed Terms
of Reference provides opportunities for empowered
Headteachers and senior officers to lead change and drive
continuous improvement, with a strong focus on collaboration
and informed decision-making.
• A GIRFEC Practice Framework has been developed to provide
a consistent and shared approach for all practitioners working
with children, young people and their families in Midlothian.
• Three GIRFEC network sessions have been developed and will
be delivered from August to November 2026, providing
updates and to ensure the right staff receive the right
information on a regular basis. Provide and share good
practice – building on case examples with positive outcomes. 
Based on National and local
priorities, the EEG will focus
on specific priority tasks,
assign clear leadership roles
and establish short-life
working groups. 
Develop and agree a Single
Child/Young Person's
Planning format for use
across services in
Midlothian. 
Page 193 of 260

Page 194

Page 24 of 39 
OFFICIAL
• The Midlothian Single Point of Access for mental health and
wellbeing supports for children and young people has been
designed and streamlined with a new online request system.
This will be piloted in 2026-27 as part of the GIRFEC
framework, linking with the Team Around the Child meetings
and Family Wellbeing Service. 
Attendance
• 8 schools participated in the Pareto approach to strengthen a
data-driven approach to improving attendance through
targeted, responsive interventions. 
• A test of change on Mentoring for Engagement in Education
was developed through partnership with schools, families,
Educational Psychology, Home School Practitioners and Family
Wellbeing Service. Evaluation showed improvements in
attitude, relationships and engagement.
• Strengthened inclusive practice for neurodivergent children
and young people through My Predictable Day professional
learning.
• Reviewed and analysed use and impact of SCERTS across
Midlothian and developed an implementation plan for Complex
Needs Provisions for 2026-27. 
Continue to develop a
Midlothian website for all
services to access relevant
updates and resources. 
New Single point of access
to be piloted in 2026-27. 
Professional learning and
support to be rolled out to
support young people
presenting with emotionally-
based absence. 
Ongoing strengthening of
assessment and intervention
in relation to the needs of
learners with
neurodivergence. 
SCERTS to be rolled out
across Complex needs
provisions in 2026-27. 
Page 194 of 260

Page 195

Page 25 of 39 
OFFICIAL
Section 4: Education Service Improvement Plan 2026-2027
National Improvement Framework
Outcomes 2026-2027
Midlothian Education Service Outcomes
2026-2027 
Midlothian Education Service Outcome
Measures 2026-2027
Outcome 1 
A globally respected, empowered and
responsive education and skills system with
clear accountability at every level that
supports children, young people, and adult
learners to thrive. The system enables the
development of their knowledge, skills, values
and attributes that give them the best
opportunity to succeed and contribute to
Scotland’s society and economy. 
Outcome 4
High levels of achievement across the
curriculum for all learners, with action to close
the poverty-related attainment gap. 
Outcome 5
Highly skilled teachers and school-leaders
driving excellent learning, teaching and
assessment for all, especially those with
additional support needs.
Children and young people have improved
attainment and achievement and reach
ambitious outcomes. 
Children and young people receive their
entitlement to high-quality universal
provision which promotes engagement and
improved outcomes.   
Children and young people benefit from a
skilled and confident workforce promoting
leadership at all levels to deliver excellent
learning, teaching & assessment for all
learners, in line with professional
standards. 
Attainment and attendance reaches or exceeds
stretch aims. 
All schools are "Good" or better in the
measured Quality Indicators. For 2026-2027,
we will carry out validated self-evaluation in key
themes within QI 1.3, 2.3 and 2.4 and the
correlated Early Years Framework quality
indicators. 
All schools and ELCs have confident and
competent leaders who develop leadership at
all levels that improve outcomes for all learners. 
Midlothian professional learning continues to be
evaluated at 90%+ in relation to relevant skills
and confidence. 
Robust school tracking and monitoring systems
will inform universal and targeted support offers
and measure the impact for learners.
Outcome 2
Young people experience the benefit of
schools and early years settings working in
excellent partnerships with wider children’s
services and other partners, families, and
communities, in line with the Getting It Right
For Every Child (GIRFEC) approach.
Children and young people benefit from
data-informed ASGs collaborating with
partners to improve outcomes for all 3-18
learners. 
All learners receive their full statutory
entitlement to an education. 
Evaluation of ASG improvement plans shows
strengthened partnerships to improve learner
outcomes. 
Page 195 of 260

Page 196

Page 26 of 39 
OFFICIAL
Outcome 3
Inclusive and relevant curriculum and
assessment which gives young people the
knowledge and skills necessary to contribute
to society, shape a sustainable future, while
celebrating and supporting progression for all.
Children and young people benefit from an
inclusive and relevant curriculum, that
prepares them for their future. 
Effective implementation of the Curriculum
Improvement Cycle is leading to an engaging
curriculum that supports children and young
people to achieve their best. 
Outcome 6
Improving relationships and behaviour, and
attendance, with increased engagement in
learning and a culture of dignity and respect
for all
Children and young people experience, and
contribute to, positive, respectful
relationships within a culture of dignity and
respect.
Feedback from pupil voice groups indicates
learners are meaningfully engaged in decisions
that affect them. 
Outcome 7
An education system engaging in digital
technology to enhance all aspects of learning
and teaching, supported by a digitally-skilled
workforce, and tackling digital inequality.
Children and young people are equipped
with skills to navigate and thrive within a
rapidly-evolving digital landscape. 
Children and young people feel fully
engaged in decisions that affect them.
There is a robust Artificial Intelligence offer for
education staff with adoption rates increasing
towards 75%. 
Page 196 of 260

Page 197

Page 27 of 39 
OFFICIAL
How is our work organised in 2026-2027? 
Inclusive Learning, Teaching, Assessment & Curriculum Wellbeing, Targeted Support & Partnerships
Launch Keys for Communication in Council and Partner Provider
Early Learning Centres (ELCs) 
Prepare our leaders and workforce to develop quality
environments and experiences for under 3s in identified ELCs. 
Review the Midlothian Inclusive Learning, Teaching, Assessment
& Curriculum Strategy in line with the national Curriculum
Improvement Cycle (CIC) as this develops. 
Develop 3-18 curriculum pathways in line with the CIC. 
QA Meta Skills across LTA and Curriculum. 
Further develop a digitally-skilled, Artificial Intelligence (AI) literate
workforce to support children and young people to navigate AI. 
Update the Digital Skills Framework to include a new AI literacy
track and a new digital habits track, specifically in relation to
screentime/ distraction to better equip young people to develop
their own boundaries around proportionate use of technology. 
Refine the Professional Learning (PL) offer to support highly
effective inclusive Learning, Teaching, Assessment and
Curriculum (iLTAC) 
Implement Year 2 of the Core Numeracy Building Thinking
Classrooms pilot. 
Implement the Midlothian Early Reading Programme. 
Review school guidance on Interdisciplinary Learning (IDL) in line
with the CIC.  
Fully embed the refreshed Getting It Right For Every Child (GIRFEC)
framework and the single Child's Plan. 
Strengthen the impact of wellbeing interventions and support across the
Staged Intervention Matrix. 
Improve the Sphera and bullying tracking systems to ensure accurate
recording, tracking and action planning that supports adults in our
schools in relation to violent and bullying incidents. 
Develop and share an Inclusion Statement which details a shared
understanding of inclusion across Midlothian schools and communities,
aligned with the principles of GIRFEC. 
Bring together our policy, guidance and processes that support leading
an inclusive school. 
Re-engage all staff with the Staged Intervention Levels Matrix. 
Establish structures of professional support that promote staff wellbeing
at all levels. Establish staff well-being measures with our Human
Resources (HR) team. 
Review the strategic focus for the Midlothian Relationships and
Behaviour Group, in line with the guidance from the national Strategic
Action Group for Relationships and Behaviour in Scottish Schools
(SAGRABIS) 
Page 197 of 260

Page 198

Page 28 of 39 
OFFICIAL 
Roll out school guidance to support effective play pedagogy. 
Leadership at all levels
• Establish structures of professional support that promote wellbeing at all levels.
• Strengthen the effectiveness of our approaches to an empowered education system including the review of the Education Executive
Group (EEG), opportunities for wider involvement of school leaders in system improvements, strengthen Headteacher Trios and
Middle Leadership development.
• Develop a senior leadership pathway
• Update the Quality Improvement (QI) Framework and develop a PL offer for school and ELC leaders that improves self- evaluation of
QI 1.3, 2.3 & 2.4 and corelated Early Years Framework themes.
• Continue to strengthen the effective use of data for improvement to improve all transitions. Ensure schools & ASGs have data they
need. 
• Quality assure the implementation of the Data Timeline through the Data & Performance Group.
• Implement a school data tracking and monitoring solution. 
• Strengthen tracking attainment for Quintile 1 & 2 learners at Local Authority level.
• Analyse violent incidents and bullying incidents to inform planning, professional learning, and support.
• Use cumulative attendance data to track trends and inform next steps.
• Share effective leadership practice including self-evaluation and distributed leadership at all levels.
• Support HT and DHT leadership of ELCs and ASN Provisions.
• Establish staff well-being measures with HR team to enable tracking and monitoring of employee wellbeing. 
Our detailed workstream plans can be found in Education Service Microsoft Teams folders and will not be available externally. 
This is a link to our Parent Friendly Service Plan 
Page 198 of 260

Page 199

Page 29 of 39 
OFFICIAL
APPENDIX 1: Data we use to measure progress 
• Attendance data 
• Analysis of VSE reports, school and ELC improvement plans
• Attainment data
• Exclusions data
• Part-time timetable data 
• Gap and stretch aims data
• Complaints data
• Sphera reports
• Learner and staff wellbeing data
• Staff absence data
• PL evaluation data 
• Workforce survey data
• Care Inspectorate and Education Scotland reports
• Stretch Aims analysis 
• Staff wellbeing data once this is defined during 2026-27 
Improving Attainment within the Broad General Education Stages  
Midlothian DATA 2021 2022 2023 2024 2025 Target*
Primary Literacy 65.8% 68.2% 71.6% 72.3% 76.6% 73%
Primary Numeracy 72.8% 76.1% 76.8% 76.8% 80.2% 79%
S3 Literacy (Third Level or better)   80.7% 85.4% 84.4% 89.7% 88%
S3 Numeracy (Third Level or better)   88.5% 90.5% 91.6% 93.9% 93% 
The Stretch Aims for these areas have been met for 2025. 
Page 199 of 260

Page 200

Page 30 of 39 
OFFICIAL 
There have been significant increases across all areas since 2024 and the figures for 2025 are the highest on record, post-pandemic.  The
2025 figures are also above the national and comparator figures for 2024, with the exception of Primary Numeracy, which is just below the
national figure (by 0.1 percentage points).
Page 200 of 260

Page 201

Page 31 of 39 
OFFICIAL
Improving Attainment within the Senior Phase 
Literacy and Numeracy for School Leavers 
Leaver attainment in Literacy and Numeracy at SCQF Levels 4 & 5 is greater than the Virtual Comparator (VC) and above the National. 
At Level 5, Numeracy remains above the VC, it has increased by 3 and a half percentage points compared to 2024. Literacy has increased by
over 4 percentage points since 2024; this is an improvement on previous years where it was in line with the VC.  
Page 201 of 260

Page 202

Page 32 of 39 
OFFICIAL
Average Complementary Tariff Scores for School Leavers, Grouped by Attainment 
Year
Lowest-Attaining 20% Middle-Attaining 60% Highest-Attaining 20%
Midlothian VC National Midlothian VC National Midlothian VC National
2025 118 106 120 598 582 622 1213 1248 1276
2024 111 104 118 540 532 610 1213 1225 1269
2023 129 95 127 520 501 612 1243 1217 1286
2022 131 123 137 588 582 643 1279 1265 1304
2021 111 120 144 584 600 691 1339 1289 1339 
Page 202 of 260

Page 203

Page 33 of 39 
OFFICIAL
Senior Phase Qualifications: Percentage of Leavers with 1 or more, or 5 or more awards at SCQF Levels 5 and 6 (or better) 
The figures for Midlothian in all four measures have been above the VC for the past three years. Compared to 2024, there have been notable
improvements at one or more and 5 or more at Level 6 or better (5+ percentage points.   
Page 203 of 260

Page 204

Page 34 of 39 
OFFICIAL
Senior Phase: Leavers in Positive Initial Destinations 
Establishment 2021 2022 2023 2024 2025
Midlothian  94.44% 95.50% 95.30% 95.27% 95.35%
Virtual Comparator 95.20% 95.38% 94.82% 95.17% 95.44%
National  95.48% 95.74% 95.87% 95.71% 95.67% 
The percentage of leavers in a positive destination has been above the VC for the past five years and has been within a percentage point of the
national figure for the last four years. 
Page 204 of 260

Page 205

Page 35 of 39 
OFFICIAL
Equity Attainment Gap: Achievement of Curriculum for Excellence Levels (Pupils registered for Free School Meals versus those who
are not)  
ACEL gap - FMR v Non FMR 2021 2022 2023 2024 2025
Literacy - P1/P4/P7 combined 32.24% 26.83% 26.53% 31.32% 22.65%
Numeracy - P1/P4/P7 combined 27.98% 24.29% 25.11% 30.60% 16.62%
S3 Literacy - Third Level or better   28.88% 28.57% 17.96% 16.66%
S3 Numeracy - Third Level or better   22.19% 16.51% 7.63% 8.65% 
The gap between primary pupils registered for free school meals and those not, narrowed significantly in 2025 compared to 2024 for both
Literacy and Numeracy, and the current gaps are the smallest on record, post-pandemic. For secondary pupils, the gap narrowed very slightly
for Literacy at Third Level or better, and increased slightly for Numeracy, although the gap for Numeracy remains the smallest overall across
primary and secondary. In both sectors, the gaps for Literacy remain wider than for Numeracy.    
Equity Attainment Gap: School Leavers at SCQF Levels 4, 5 and 6 (Pupils registered for Free School Meals versus those who are not) 
Year
1+ @ SCQF Level 4 1+ @ SCQF Level 5 1+ @ SCQF Level 6
FSM Non-FSM Gap FSM Non-FSM Gap FSM Non-FSM Gap
2025 89.76% 96.76% 7.00% 66.14% 89.92% 23.78% 41.73% 72.77% 31.04%
2024 86.72% 92.46% 5.74% 60.16% 89.86% 29.70% 25.78% 67.81% 42.03%
2023 96.90% 98.23% 1.33% 72.09% 89.16% 17.07% 31.78% 60.90% 29.12%
2022 96.97% 97.91% 0.94% 66.67% 89.75% 23.08% 26.52% 67.89% 41.37%
2021 92.55% 95.91% 3.36% 67.02% 86.85% 19.83% 28.72% 63.73% 35.01% 
The gaps between Free School Meals (FSM) registered and non-FSM registered leavers at SCQF Level 4 increased in 2025, to its highest in
five years. The gap at SCQF Levels 5 & 6 has decreased significantly in 2025. 
Page 205 of 260

Page 206

Page 36 of 39 
OFFICIAL
APPENDIX 2: Children’s Rights and Wellbeing Impact Assessment (CRWIA) 
Requirement for a CRWIA 
Article 4 of the UNCRC requires governments ‘to undertake all appropriate legislative, administrative and other measures for the
implementation of the rights recognised in the UNCRC’. CRWIAs are one of the general measures of implementation under the
Convention. The UN Committee on the Rights of the Child recommends that all levels of government - national, regional and local –
should complete a CR[W]IA as part of their policy development. 
Child Rights and Wellbeing Screening Sheet for Midlothian Council Education Service Improvement plan 2024-2025 
Midlothian Council’s Education Service Improvement Plan 2024-2025 outlines the improvements we will make to learner outcomes.
This contributes to the National improvement Framework in Scotland.  The Education Service Improvement Plan 2024-2025 will
affect the following   
UNCRC Articles  GIRFEC wellbeing indicators: 
Article 2 (non-discrimination) 
Article 3 (best interests of the child) 
Article 6 (life, survival and development) 
Article 12 (respect for the views of the child) 
Article 19 (protection from violence, abuse and neglect) 
Article 20 (children unable to live with their family) 
Article 21 (adoption) 
Article 23 (children with a disability) 
Article 24 (health and health services) 
Article 28 (right to education) 
Article 29 (goals of education) 
Article 31 (leisure, play and culture) 
Article 39 (recovery from trauma and reintegration) 
Article 40 (juvenile justice) 
Article 41 (respect for higher national standards) 
Article 42 (knowledge of rights) 
Safe 
Healthy 
Achieving 
Nurtured 
Active 
Respected 
Responsible 
Included 
The likely impact on children and young people of the Midlothian Education Service Improvement Plan includes: 
The improvement of outcomes for all learners (eg attendance, exclusion, attainment) 
The plan will impact all children and young people who attend Midlothian Council schools and ELCs.  
Page 206 of 260

Page 207

Page 37 of 39 
OFFICIAL   
A CRWIA will be carried out for the following reasons: 
To check that children and young people have been consulted. 
To check on the impact on children’s rights, of the Service Improvement Plan. 
To assess the impact on different groups of children and how we will communicate this to children. 
To check any negative impacts are necessary and proportionate and can be mitigated against. 
To check how the plan will effect the UNCRC implementation in Scotland. 
To check how we will monitor the impact of the plan.     
Child Rights and Wellbeing Impact Assessment (CRWIA) for Midlothian Council Education Service Improvement Plan  
There are two key considerations when undertaking a CRWIA:  
Participation: The United Nations Convention on the Right of the Child (UNCRC) sets out that children have the right to participate
in decisions which affect them. When assessing the impacts of the policy/measure, we are recommended to consult with children
and young people. We can do this directly, through organisations that represent children and young people or through using
existing evidence on the views and experiences of children where relevant. Participation of children and young people should be
meaningful and accessible. 
Evidence: We are recommended to gather evidence when assessing the impact of the policy/measure on children’s rights and also
for measuring and evaluating the policy/measure. If we identify any gaps in the evidence base, we are recommended to discuss
how we will address these with analytical colleagues. 
Which articles of the UNCRC does this policy/measure impact on? 
UNCRC Articles  GIRFEC wellbeing indicators: 
Article 2 non-discrimination 
Article 3 best interests of the child 
Article 6 life, survival and development 
Article 12 respect for the views of the child 
Article 19 protection from violence, abuse and neglect 
Article 23 children with a disability 
Article 28 right to education 
Article 39 recovery from trauma and reintegration
Safe 
Healthy 
Achieving 
Nurtured 
Active 
Respected 
Responsible 
Included 
Page 207 of 260

Page 208

Page 38 of 39 
OFFICIAL
What impact will your policy/measure have on children’s rights?  
Positive  Neutral  Negative 
Key learner outcomes will improve (e.g.
attendance, exclusions attainment) 
Support for children with additional support
needs will improve.
Children will have a voice in learner
conferences, focus groups and other types of
consultation.
Staff will be able to promote positive
relationships and nurturing approaches.     
3. Will there be different impacts on different groups of children and young people? 
Not applicable  
4. If a negative impact is assessed for any area of rights or any group of children and young people, can you explain why
this is necessary and proportionate? What options have you considered to modify the proposal, or mitigate the impact? 
Not applicable
If options to modify the policy/measure are included here, include associated resource implications where relevant.   
Not applicable  
5. How will the policy/measure give better or further effect to the implementation of the UNCRC in Scotland? 
The Midlothian Education Service Improvement Plan 2024-2025 will further improve the outcomes for all learners and therefore
underpin  the highlighted Articles above. 
6. How have you consulted with relevant stakeholders, including involving children and young people in the development
of the policy/measure? 
Children and young people were consulted during 
The National Conversation focus groups. 
Quality Improvement visits to schools (learner focus groups). 
Council-wide representative groups for children and young people (eg learner conferences). 
7. What evidence have you used to inform your assessment?  
See below.
Page 208 of 260

Page 209

Page 39 of 39 
OFFICIAL 
8. How will the impact of the policy/measure be monitored? 
The Midlothian Education Service Improvement Plan has outcome measures that we use to evaluate the impact of the plan. These
are clearly laid out in Section 1.5. The Education Senior Leadership Team reports on progress towards our outcome measures
every 3 months. The Excellence & Equity Board monitors our outcomes. 
9. How will you communicate to children and young people the impact of the policy/measure on their rights? 
At the start of the school year, the Education Senior Leadership Team provides a child-friendly summary of the Service
Improvement Plan. This can be used by teachers to discuss our improvement plan, and its impact on children’s rights, with children
and young people. It can also be used to gather views from children and young people about what is going well and what could
improve. 
10. Sign & Date 
Policy Lead Signature & Date of Sign Off:  
Once signed off, please send to CRWIA@gov.scot 
Photos courtesy of Midlothian schools’ websites, February 2026
Page 209 of 260

Page 210

Page 210 of 260

Page 211

Midlothian Council
Tuesday 22 September 2026
Item No 8.9 
Edinburgh and South East Scotland City Region Deal (ESESCRD) -
Regional Partnerships Proposition 
Report by Kevin Anderson Executive Director Place 
Report for Noting 
1 Recommendations 
Council is recommended to: 
1.1 Note that the drafted proposition document, included at Appendix B,
was presented to the ESESCRD Joint Committee meeting on 4
September 2026 before it is considered by each of the six constituent
local authority partners; 
1.2 Note that feedback and direction was received at the ESESCRD Joint
Committee meeting and is now sought from each of the six Local
Authority meetings; and 
1.3 Note that the proposition will be shared with Scottish Government
subject to progress with the recommendations above. 
2 Executive Summary 
On Friday 28 November 2025, the First Minister highlighted the Scottish
Government’s intention to introduce (in the next parliament) enabling
legislation, which will allow regional groupings to seek formal legal status as a
“Regional Partnership”, with a range of powers and responsibilities. Including
skills, economic development and planning. 
Capacity funding was made available from Scottish Government to regional
partnerships to consider how they will respond to the First Minister’s
announcement. The ESESCRD Partnership used this funding to commission
Metro Dynamics to develop a proposition that helps partners better
understand the range of options that could be available to strengthen and
fiscally empower our regional partnership, building on the region’s successful
track record of collaboration. 
On Friday 23 January 2026 the Joint Committee approved the Regional
Partnership Working report. Members were asked to agree the approach for
developing a draft proposition and for engagement with partner authorities. 
The new UK Government has publicly stated their desire to deliver greater
devolution to drive economic growth across the UK.  Page 211 of 260

Page 212

On 29 July 2026, the Convener of the Edinburgh and South East Scotland
City Region Partnership and Chair of the Glasgow City Region Cabinet co-
wrote a letter to the new Prime Minister highlighting the economic importance
of Scotland’s two biggest city regions and to request a meeting with him to
discuss how the UK Government can provide support similar to that being
afforded to English City Regions to deliver greater sustainable growth. 
Date 24 August 2026
Report Contact: 
Kevin Anderson, Executive Director Place
kevin.anderson@midlothian.gov.uk  
Page 212 of 260

Page 213

3 Background 
3.1 Utilising Scottish Government capacity funding, consultants Metro
Dynamics were asked to undertake four key work packages: 
Gathering Evidence - Review current policy landscape by reviewing local,
regional, Scottish and UK existing plans and strategies as well as canvassing
opinion from stakeholders. 
Stakeholder Engagement - Work with key regional stakeholders, including
both Governments, all city regional deal partners, and others to understand
barriers to success in key policy areas and what enabling powers, legislative
change, financial innovation etc are required to overcome these challenges. 
Engage key national agencies including Transport Scotland, Skills 
Development Scotland and Scottish Enterprise. 
UK Comparator Research Report - Produce Case Studies to help consider
existing exemplar UK Regional Partnerships and what enablers, powers and
resources have been key to their success and, conversely, what has proved
problematic Recognise that there will be no one size fits all solution, consider
what has worked elsewhere and how this could best work with existing ESES
regional governance arrangements 
Options Report – including but not restricted to:   
• Powers – areas of competence currently in prospect, which are skills,
economic development, planning and consider what other policy areas are
essential for a successful, functioning regional economy now and in the
future. 
• Financial and resource requirements 
• Fiscal powers and freedoms to fund and delivery plans, strategies and
infrastructure 
• Governance and decision-making models including the existing regional
governance arrangements 
3.2 These four work packages were designed to inform a completed
proposition document developed in collaboration with ESESCRD partners and
key stakeholders. 
3.3 The work packages have now been completed and the drafted, emerging
regional proposition report has been produced. 
3.4 This work aims to enable partners to better understand the range of
options that could be available to strengthen and fiscally empower our
regional partnership to better deliver sustainable economic growth. 
3.5 The areas of exploration in the proposition respect the proper competence
of Local Authorities in addressing matters of local concern. Focus is given to
issues that cross local authority boundaries and where there is clear added
value in working together to address shared challenges and opportunities, in
Page 213 of 260

Page 214

line with the subsidiarity principle that decisions should be taken as closely as
possible to the citizens or stakeholders most affected. 
This ongoing work is about potential devolution from the UK and Scottish 
Governments, exploring the potential to draw powers down to the regional 
level. It is not about losing existing powers that sit with local authorities or
impinging on their individual sovereignty. 
4. Next Steps 
4.1 The Proposition document was presented to the ESESCRD Joint
Committee meeting on 4 September 2026 seeking feedback and direction. 
4.2 Following this, further feedback and direction is sought from each of the
six constituent local authority partners with agreement sought to develop a
further detailed proposition. This will be developed with continued
engagement with the Scottish and UK Governments, SOLACE and COSLA.  
4.3 A detailed proposition would then require to be individually and collectively
agreed following the 2027 Council Elections. 
5 Report Implications (Resource, Digital and Risk) 
5.1 Resource 
Scottish Government capacity funding has been utilised to undertake this
work. The proposition does not commit resources from the six constituent
local authorities. 
5.2 Digital 
Not applicable 
5.3 Risk 
This work aligns closely with the Scottish Government’s intention to launch a
consultation, this calendar year, on advancing enabling legislation to empower
regional groupings with devolved competencies and direct responsibility for
local priorities. The aims of this work to advance sustainable economic growth
and to enable communities to shape their own futures 
5.4 Ensuring Equalities (if required a separate IIA must be completed) 
Not applicable 
5.5 Additional Report Implications (See Appendix A) 
Page 214 of 260

Page 215

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
Not applicable 
A.5 Involving Communities and Other Stakeholders 
Not applicable 
A.6 Impact on Performance and Outcomes 
Not applicable 
A.7 Adopting a Preventative Approach 
Not applicable 
A.8 Supporting Sustainable Development 
Not applicable 
Page 215 of 260

Page 216

Appendix B - 
Edinburgh and South-East Scotland | Emerging Devolution Proposition
Page 216 of 260

Page 217

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Edinburgh and South-
East Scotland |
Emerging Devolution
Proposition
A report from Metro Dynamics to
ESES Authorities
August 2026
1Page 217 of 260

Page 218

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
The purpose of this pack
This pack sets out an outline proposition for devolved collaboration across
Edinburgh and South East Scotland (ESES). It has been developed by Metro
Dynamics on behalf of ESES local authorities and with funding support from
the Scottish Government, and as a result does not reflect agreed policy from
either local or national Government. The propositions in here have been
based on discussions and engagement with elected members, council
officers, and key partner organisations over the preceding months.
As this pack sets out, there is a narrow window of opportunity for ESES to
think carefully about future priorities. With the right interventions, devolution
offers the potential to capitalise on the economic trends that are reshaping
the region, and avoid the risk of falling behind comparator places within and
beyond the UK.
Following engagement with ESES stakeholders and governance forums, this
emerging proposition is now set for discussion among ESES local authorities
for feedback ahead of the development of a full detailed proposition, as set
out in the bullet points overleaf.
2
What next – an opportunity to move fast:
➢ September 2026: Joint Committee, for feedback and direction
➢ September–November 2026: individual council consideration for
feedback, direction and agreement to develop detailed proposition
➢ November–March 2027: Making this real: theme development,
governance & funding proposition workstreams
➢ March 2027: Consideration for approval in principle of detailed
proposition by Joint Committee, subject to approval from individual
councils
➢ May 2027: Council Elections
➢ Autumn 2027: Expected introduction within Scottish Parliament of
enabling legislation to give regional partnerships legal status
➢ Autumn 2027: Consideration of detailed proposition by individual
councils
Page 218 of 260

Page 219

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Key questions for ESES local authorities to shape this
emerging proposition?
➢Have we captured the right sense and scale of the economic prosperity opportunity for ESES?
➢Does the emerging proposition reflect your strategic priorities for collaboration through ESES, and are there any policy areas the draft
proposition ought to cover but doesn’t currently?
➢Are there any specific policy asks in this emerging devolution proposition that would require further consensus building before
committing to further development?
➢What role should ESES seek to play in the oversight, steering and delivery of the functions currently carried out by arms-length
Scotland-wide agencies?
➢To what extent should ESES look to adopt existing UK governance models (such as English Mayoral Strategic Authorities), develop
entirely new approaches and structures, or adapt existing joint governance models (such as Welsh Corporate Joint Committees)
➢Where next – what should the next steps be to expand the scoping work? What questions are currently unresolved from the current
proposition?
3Page 219 of 260

Page 220

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Introduction and Executive
Summary
4Page 220 of 260

Page 221

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Introducing regional
devolution in ESES
5
• A narrow window to secure meaningful powers: John
Swinney speech from November 2025: “We will introduce
enabling legislation in the next Parliament to allow regional
partnerships to seek legal status, unlock new powers, and
design delivery models tailored to local priorities.”
• An opportunity to deepen the powers held locally
through a regional economic partnership: taking powers
and funding held by the Scottish Government and agencies,
plus UK level funding, and bringing them closer to the level
where the impact of decisions are held.
• Building on 8 years of successful delivery of the ESES
City Region City Deal, with £3bn of GVA added, 22,000 job
opportunities created, and 1,000 businesses supported by
deal activities. But this was a time-bound deal that will soon
be coming to an end.
Now ESES must decide the regional priorities that best capitalise
on these opportunities for the region, and the level and depth of
collaboration that could enable new powers and funding.
W
hat regional devolution is about ➢ More local control over funding and programmes as
opposed to national decision making
➢ Longer term funding certainty with multi-year
settlements
➢ Drawing down powers and flexibilities which are not
currently available locally to deliver local benefits
➢ Increased visibility for ESES and greater policy and
investment influencing within a Scotland and UK-wide
policy context
➢ Different ways of working; new deeper approaches to
collaboration focused on growth and reform
W
hat regional devolution isn’t
about
➢Taking powers off local authorities; powers will be
exercised in co-ordination across ESES
➢Asking permission for what you can already do
➢Just about extra money; devolution is about powers,
unblocking and new flexibilities
➢The local government finance settlement – this is in
addition to funding for ESES local authorities
➢A new upper tier structure; this is about different ways of
working and collaboration Page 221 of 260

Page 222

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
The change proposition on one page:
Unlocking and sustaining prosperity via
deepened devolution
6
ESES City Deal Theme
Housing
Transport
Skills
Culture
Innovation
Housing
delivery
Transport,
Infrastructure
and planning
Skills and
Labour
Markets
Culture and
Tourism
Innovation
and enterprise
Public Service Reform
Long term pooled funding and Fiscal devolution
Enhanced governance & ways of working
Underpinned by
Devolved leadership and decision making through a maintained
and broadened remit across six core thematic policy areas:
Energy
and
electrific
ation
Trade,
Investment
and
Internationa
lisation
Potential future policy areas:
Other
adjacent
policy
remits?
Powers and funding: No additional powers
and a time-limited pot of investment funding
that is now coming to an end
Powers and funding: New additional powers devolved from the Scottish government
and from the UK Government, with longer-term, integrated and flexible funding
settlements that allow for certainty and efficiencies in delivery
Climate
Resilience and
Natural Capital
Delivering broad-based prosperity for all ESES residents
Poverty
reduction
Page 222 of 260

Page 223

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY 7
Why devolution matters now for ESES
Continued economic growth in ESES will be essential for the
prosperity of Scotland. However, ESES faces significant and growing
constraints on growth, including housing, transport, and skills. These
could dampen the recent positive economic momentum.
Indicative economic modelling suggests that if ESES were to grow in
line with the Scottish economy as a whole, at the lower Scotland-
wide rate of 1.1%, then the Scottish economy will be £12.3bn
smaller relative to current trends today.
Five pressures make this moment decisive:
• Infrastructure is under intense strain – 5 of the 6 local
authorities have declared a housing emergency, and transport is
congested and fragmented
• Skills shortages are growing – leading to bottlenecks in key
sectors that will hold back growth
• The city region deal is time bound, and the First Minister has
asked ESES to define what powers are needed for a new phase
• The ongoing rationalisation of Public Bodies, as part of the
PSR strategy
• The devolution opportunity is now, with English cities seeing
more powers and funding to deliver locally set growth plans
Without ESES devolution
• Fragmented decision-making across a single economic area
• Reduced influence over Scottish & UK investment and policy
• Risk of falling behind as other areas secure funding, powers and profile
With ESES devolution
• Ability to direct growth-enabling interventions to where they are
most needed, addressing inequalities between and within communities
• Ability to develop ESES’s own priorities (which could include poverty
reduction, affordable housing, innovation) with the levers to deliver
• Ability to align transport, skills, housing and economic development
at the scale of the real economy
• Turn major investments into connected, high-value clusters, not
isolated developments
• A stronger platform to attract and shape investment, with a single,
credible voice to Scottish Government and industry
• Greater capacity to broker partnerships and coordinate delivery
across institutions, sectors and places
Page 223 of 260

Page 224

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
The case for change
8Page 224 of 260

Page 225

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY 9
Devolution to ESES is a response to a time-limited opportunity
This proposition has been developed through extensive engagement with
stakeholders across Edinburgh and South East Scotland. Across Place
Directors, third sector, and senior executives and Members, there is a
recognition that the case for devolution has been strengthened in recent
years as a result of wider economic, policy and fiscal trends (see overleaf).
There are also strong and consistent views that the next phase of
devolution must move beyond a programme-based City Region Deal toward
a functional regional system with:
➢ Clear powers and accountability at regional level
➢ Long-term, flexible funding
➢ Clear outcomes defined by the region, setting out what will change
through enhanced collaboration and devolution
➢ Ability to integrate policy, delivery and investment
➢ Strong connection to hyper-local delivery and community outcomes
Across ESES stakeholders, there is broad appetite for this shift, but
conditional on the “prize being big enough”, particularly in terms of powers
and funding certainty. The principles based on this engagement have been
embedded into the proposition, and are reviewed in depth further on.
Insights from our engagement
What factors are driving the case for enhanced devolution?
1
ESES represents a nationally significant engine of inclusive growth.
Edinburgh and South East Scotland (ESES) represents a critical
economic engine whose continued success is essential to prosperity for
all Scotland’s residents. But the region is being held back by
infrastructure, skills and housing constraints which need an empowered
regional response not fragmented funding and decision making.
2
Increasing fiscal constraint and the imperative for public service
reform is driving the need for more fundamental reform of how public
services are organised and delivered, including reducing duplication,
improving efficiency and maximising the impact of existing resources.
3
The current delivery landscape is overlapping, duplicative, and
inefficient, with too many actors and unclear roles. National agencies
do not always reflect regional priorities or operate effectively at local
level and growth opportunities can be missed.
The key takeaway: Unlocking continued inclusive growth now requires
moving beyond a fragmented, programme-based model towards a more
coherent system of strategic regional economic governance, aligned to the
scale of the functional economy and capable of integrating policy, prioritising
investment and driving delivery.
Figure: Insights drawn from 1-1 engagement with key ESES stakeholders over Summer 2026:
Page 225 of 260

Page 226

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Increased economic inter-dependence has policy
implications for ESES
The designation of the City-Region deal in 2018 recognised that Edinburgh and South East
Scotland increasingly functions as a set of interdependent local economies, with residents
living, working and socialising across local authority borders. This reflects wider economic
trends, with urban centres playing an increasingly important role in producing value.
As a result, transport infrastructure and associated planning – strategic roads, rail, and
mass transit – is increasingly important in connecting residents and businesses to wider
opportunities, and requires co-ordination. Likewise, housing delivery is an area where
markets operate across functional economic areas, and where co-ordinated action is
required to avoid uneven distribution of demand, congestion and shortages. Skills and
labour support will have to change to reflect the growing integration of local labour markets,
as with innovation and enterprise reflecting the need for new firms to benefit from cross-
border clustering. Finally, culture and tourism is another area where collaboration can add
value, especially when viewed as part of wider economic infrastructure and collaboration.
This won’t replace the need for locally-led growth programmes; regeneration of local centres
will be an essential component of any devolved collaboration of programme, to ensure that
all ESES residents and constituent places benefit from regional growth. But some form of
regional collaboration will be required if ESES is not to fall behind the places that are seeing
similar economic trends and are working together to capitalise on them.
10
Figure: Housing and Strategic Infrastructure in ESES
Page 226 of 260

Page 227

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
ESES represents a recent economic success story within both
the Scotland and the UK-wide context
Over the last decade, Edinburgh and South East
Scotland has seen relatively high rates of economic
growth, substantially above both the Scottish (1.1%) and
UK-wide (1.6%) averages.
Had ESES grown in line with the Scottish economy as a
whole over the last decade, at the lower rate of 1.1%,
then the Scottish economy would be £5.7bn smaller
today. This would, in turn, have significant implications
for the tax revenues available to the Scottish
Government, and the spending priorities that national
devolved government could pursue.
One of the challenges for ESES is not only to maintain
this growth, but to make sure it is more inclusive for
residents and builds wealth for communities across the
region, many of whom have not yet seen the benefits of
recent economic growth.
11
£0
£10,000
£20,000
£30,000
£40,000
£50,000
£60,000
Economic growth (GVA) in Edinburgh and South East Scotland,
1998-2023
Actual ESES growth trends 1998-2023 Low growth scenario - ESES grows in line with Scottish economy
Page 227 of 260

Page 228

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Despite this growth, not all places within ESES are seeing the
same benefits in terms of household incomes
The impact of economic growth on ESES households
shows significant differentiation between places. The
outer suburbs of Edinburgh and regeneration focal
points like Leith have seen rapid incomes growth, while
towns like Dunfermline or Livingstone have seen slower
or even negative growth in incomes for residents.
However, rapid income growth also puts pressure on
housing affordability and private rents, with housing
supply failing to keep pace with demand in certain
neighbourhoods.
Taken together, this suggests a need to collaborate to
ensure the benefits of growth are more evenly felt
across all of ESES’s communities, and to ensure that all
ESES residents have good access to economic
opportunities.
12Page 228 of 260

Page 229

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
If the ESES growth story loses momentum, then the Scottish
economy is set to substantially lose out over coming decades
Continued economic growth in ESES will be essential for
the prosperity of Scotland and the tax revenues associated.
However, ESES faces significant and growing constraints on
growth, including housing, transport, and skills. These could
dampen the recent positive economic momentum.
Indicative economic modelling suggests that if ESES were
to grow in line with the Scottish economy as a whole, at the
lower Scotland-wide rate of 1.1%, then the Scottish
economy will be £12.3bn smaller relative to current
trends today.
Devolution is therefore a dual opportunity; to continue
momentum as an economic powerhouse, and to
prioritise a more inclusive growth model.
Please note that the scenario provided on the right-hand
side is indicative only, and does not represent a projection,
but a range of growth outcomes based on the precedent of
the recent decade.
13
£20,000
£30,000
£40,000
£50,000
£60,000
£70,000
£80,000
1998200020022004200620082010201220142016201820202022202420262028203020322034203620382040
Projected economic growth in ESES, present day to 2040
2. Continued high growth
scenario, based on ESES 2013-
2023 trend (2.28% CAGR)
3. Low growth scenario,
based on Scotland 2013-
2023 trend (1.1% CAGR)
1. Growth in ESES, 2013-2023
trend (2.28% CAGR)
£12.3bn
gap by
2040
Page 229 of 260

Page 230

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Seizing the prize:
Collaboration and Finance
14Page 230 of 260

Page 231

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY 15
Key lessons learned (Summary of wider comparator review undertaken by Metro Dynamics)
The profile of place should shape institutional ambition and design. Governance models work best where they reflect how economies function
in practice: where economic activity concentrates, how labour markets operate, where structural growth pressures emerge and what forms of
coordination are required to support long-term prosperity.
Across the strongest regional systems, collective alignment around shared purpose drives institutional ambition. Successful institutions
rarely emerge through singular governance moments. More often, they develop gradually through sustained partnership working, long periods of
collaboration and collective agreement around a small number of shared economic priorities.
Institution-building begins long before formal devolution itself. Partnerships often create the initial platform for coordination, bringing together
public institutions, businesses and wider system actors around a shared economic proposition, and the strongest systems increasingly move
beyond local government alone
Long-term pooled investment frequently becomes the mechanism through which institutional capability begins to deepen. Over time,
sustained investment builds delivery credibility, strengthens institutional confidence and allows institutions to move beyond programme delivery
towards increasingly sophisticated economic leadership.
As responsibilities deepen, institutional capability compounds over time. The strongest systems progressively develop the capacity needed
to make increasingly sophisticated investment decisions, coordinate more complex economic systems and intervene strategically, increasingly
beginning to shape the wider system of place and long-term economic outcomes
Successful devolution is never simply about acquiring powers. As institutional maturity deepens, governance complexity rises and increasingly
requires stronger strategic capability to manage effectively. Building and maintaining collective agreement remains a continuous condition of
institutional success.
Successful governance models cannot simply be transplanted between places. Metropolitan economies, capital city-regions and more
dispersed multi-centre economies face fundamentally different structural growth challenges and therefore require different institutional responses.
Stronger systems emerge where governance evolves around the distinct economic realities of place.
Key devolution lessons from UK and international comparators
Page 231 of 260

Page 232

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
The enhanced partnership already has a clear policy framework;
now is an opportunity to reaffirm inclusive growth outcomes
The Regional Prosperity Framework (RPF) provides the long-term strategic context for economic, social and environmental development across ESES, setting a 20-
year vision to 2041. It builds directly on the delivery and governance foundations established through the City Region Deal, but marks a shift in emphasis; from
implementing a defined portfolio of capital projects towards an ambition to coordinate a broader, place-based approach to regional growth and inclusion. The RPF
brings together analysis of regional economic performance, sectoral strengths, productivity and labour markets alongside assessment of demographic change,
housing need, connectivity, inequality and the climate risk, which underpins the identification of nine inter-dependent ‘Big Moves’ (see below)
16Figure: Nine “Big Moves” for Regional Prosperity
The Regional Vision:
Our aim is to become the data capital of Europe. We will ensure the social and economic
benefits of this capability extend to all. All sections of the community will have the
opportunity to develop the key skills that will help to end inequalities in our society. We
will protect our environment and make best use of our extraordinary built and natural
assets, ensuring that the Edinburgh and South East Scotland City Region delivers a just
transition to a net zero economy. Our institutions, ancient and modern, will deliver
positive outcomes that enhance our local, national and international reputation.
With a new ESES devolution drive, it will be essential to recalibrate shared objectives across
the city-region to set a clear marker of ambition for devolved collaboration. This could build on
the existing policy framework, while potentially broadening out target outcomes to include key
policy areas like poverty reduction, community wealth building, and innovation.
Page 232 of 260

Page 233

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Current ESES governance arrangements are partnership
and voluntary
17
The ESES City Region operates under a non-statutory, partnership-
based governance model established through the 2028 City Deal, within
which the Joint Committee serves as the central decision-making body.
The Joint Committee, comprising primarily of the Leaders of the six
constituent local authorities, alongside key partners, provide strategic
direction, approves major decisions and oversees programme delivery,
operating on a consensus basis that reflects the voluntary nature of the
arrangement.
• Joint Committee (decision-making core): central authority for strategic
direction, approvals and oversight, composed of council leaders and
partners, operated by consensus
• Executive Board: Provides collective executive leadership, aligns
organisational activity across partners, and develops and escalates
recommendations for JC decision
• Policy/ Advisory Boards: Provide evidence, technical expertise and
stakeholder insights, with forums like the Regional Enterprise Council
providing valuable private sector input.
• Programme Management Office: PMO (hosted by City of Edinburgh
Council) provides coordination, assurance and financial administration
across the system
Page 233 of 260

Page 234

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY 18
Governance will evolve to take on new powers and funding
It is essential that governance delivers stronger, more accountable regional body with legal
and financial capacity, while maintaining local democratic legitimacy. In doing so, any
structure should retain governance strength to enable borrowing and shared liabilities;
“skin in the game” is needed to ensure successful collaboration.
Several routes have been highlighted in recent discussions, but as a new Scottish city-region
devolution model will require primary legislation (and ESES will be a primary platform in which to
make one work), there is substantial freedom and flexibility to shape a model to align with local
needs. Reference points could include the Welsh Corporate Joint Committee model, the English
Mayoral Combined Authority model, or looking further afield – for example, to the Metropole
model in France or the Barcelona Provincial Council. There is no one “best-fit”, and we have
heard that it will be essential to maintain the best of ESES governance options.
Irrespective of the final legal form, governance approaches could include:
• Each of the constituent councils appoints a number of elected members to the authority
(typically the council leader and cabinet members), with substitute members available when
required. This could range from 1 per authority to more as appropriate depending on balance
considerations.
• A Chair and one or more Vice-Chairs appointed annually from among the membership.
• No Directly Elected Mayor, with a Cabinet-style model with distributed leadership across
portfolios
• Include sub-boards to cover portfolios, evolving from the current city deal thematic boards
• Include an Enterprise Board to advise on investment decisions and strategic direction, this can
include businesses and Voluntary, Community and Social Enterprise (VCSE) employers
alongside higher and further education through a streamlined advisory structure
• An intentional “triple helix” approach, embedding university and enterprise decision-makers
Insights from engagement: Governance Criteria
We have heard existing arrangements were designed for
coordination and programme delivery, not primarily for decision-
making across integrated policy systems, and therefore require
evolution to remain effective, legitimate and accountable at a
regional scale. Key criteria proposed include the below:
• New devolved powers require governance arrangements
capable of taking binding decisions and coordinating
delivery across interconnected systems
• Deeper devolution introduces greater fiscal and policy
discretion, necessitating stronger and more visible
mechanisms of democratic and executive accountability
• Have powers to hold funding, borrow, and take binding
decisions
• Have the capacity to hire personnel, hold money, and deliver
• Effective regional growth depends on a clear mechanism for
aligning investment, strategy and delivery across policy
domains
• To be inclusive in its voices, with a different model of
engagement, funding access, and co-delivery with business
and the third sector
• Successful devolution depends on governance evolving
alongside capability, allowing the organisation to manage
increasing complexity and strategic responsibility Page 234 of 260

Page 235

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Public service reform as a catalyst for change, with a set
of implementation principles
19
Figure: The Scottish Government published Scotland's Public Service Reform Strategy:
Delivering for Scotland in June 2025. The strategy argues that public services should
become: more preventative rather than reactive; better integrated across organisations;
more efficient in how resources are used; and more community-focused and locally
designed. As part of this, the Scottish Government is looking at reducing duplication
between national organisations and creating more streamlined delivery structures. This
momentum is an opportunity to grip via devolution proposals, with key public service
opportunities highlighted below.
We suggest that supporting public service reform ambitions should be at
the heart of the ESES devolution proposals, using a set of principles to
implement change:
1. Building from what’s already here: Scale and ambition must be sufficient
to justify change – we should build on what works from the City Deal but
move beyond its constraints. However, reform should be ambitious and
proceeded by staged capability-building.
2. Regional role should integrate systems, not duplicate them. Devolution
must transfer powers from national to regional level and not centralise or
dilute local authority powers, and delivery should remain local and
community-based where appropriate.
3. A model that works for all of ESES. Any devolution model must reflect the
region’s mixed urban-rural geography and reflect the significant
distinctiveness of the places within ESES.
4. Focused on outcomes, not governance structures. ESES should move
quickly to define priority outcomes (which could include growth, inclusion
and efficiency), and focus devolution on their delivery.
5. Aligned with community activity. Public service reform in ESES should
play an additive strategic role to activity already happening on the ground,
particularly in the prevention space, and joining up the two should be a
focus of subsequent work to develop this proposition.
Page 235 of 260

Page 236

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
And funding reform and new fiscal powers can enable
investment which ESES is unusually well-placed to unlock
20
At the heart of the devolution proposal is a move to multi-year, flexible, single-pot funding with fiscal
levers, enabling strategic, flexible and revolving investment. Based on economic strengths and growth
potential, ESES is unusually well-positioned within a Scottish policy context to deliver and re-invest
returns on investment. Given ESES’s national economic importance, proposals should be developed with both
Scottish and UK Government, including:
➢ A three- or five-year single integrated funding pot, with outcomes agreed with Scottish and UK
Government
➢ Greater flexibility to reallocate funds across priorities
➢ Presumption of devolution of funding that enables equivalent outcomes to English city regions
➢ Closer collaboration with, influence over, and eventually full devolution of part or all of the financial
transaction resources of UK Public Financial Institutions (PUFINS)
Over time, this approach should be deepened as governance and collaboration matures, potentially including a
flexible and creative approach to fiscal levers, including:
➢ Retention of local growth uplift (e.g. non-domestic rates/TIF/GAM)
➢ Expanded land value capture powers, closely aligned with integrated planning, housing and transport
functions
➢ Locally designed Infrastructure levy
➢ Evergreen or revolving investment fund models
➢ Revenue assignment to a newly legally constituted body
Insights from engagement: Finance
From our conversations with ESES officers,
political leaders and stakeholders, we have
heard repeatedly that:
• Current funding is short-term,
fragmented, and restrictive, limiting
planning and delivery
• Annual allocations and ringfencing
create inefficiency and risk, particularly
for infrastructure and housing
• Programmes require repeated bidding
and cannot be aligned with long-term
outcomes
• Multi-year and flexible settlements
across programmes and core capacity
would allow for additional capacity and
proper planning at the local level which
is currently impossible
Reforming funding and fiscal structures
could significantly address some of these
challenges
Page 236 of 260

Page 237

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Multi-year and flexible spending approaches can help spend
existing money more efficiently
A limited number of “established” English Mayoral Strategic Authorities have
flexible Integrated Settlements, that combine existing funding streams into a
multi-year allocation. This can help spend the same money to better impact;
longer term funding allows for better planning, attracting and retaining key
personnel, and building up a pipeline of delivery that allows for efficiencies
of scale and specialisation.
This approach should not necessarily represent the ceiling of ambition for
Scottish ambitions, and there are certain components (for example, the
visible back-weighting towards the end of the parliament as a result of UK
fiscal rules visible overleaf, or the relative shortfall in revenue funding
relative to capital funding) that we would not recommend emulating in the
Scottish policy context. However, it is essential that Scottish city-regions do
not fall behind their English counterparts in their ability to flexibly respond to
and address local challenges and opportunities. For this reason, multi-year
settlements are a core feature of this devolution proposition.
21
MSA Name Population 2026-2027 2027-2028 2028-2029 Total
South Yorkshire
(Inc Sheffield)
1.430m £279m £319m £392m £990m
Liverpool City
Region
1.607m £352m £374m £439m £1,165m
North East (Inc
Newcastle)
2.047m £419m £451m £550m £1,420m
West Yorkshire
(Inc Leeds)
2.435m £468m £512m £600m £1,580m
Greater
Manchester
3.009m £640m £677m £760m £2,077m
West Midlands
(Inc Birmingham)
3.036m £660m £688m £743m £2,091m
Figure: English MSAs and the Integrated Settlement. For reference, please note that Edinburgh
and South East Scotland has a total population of 1,423,000 as per the latest ONS population
estimates. Four more English Mayoral Strategic Authorities have recently been announced as
future recipients of the Integrated Settlement - Cambridgeshire and Peterborough, East
Midlands, West of England, and York and North Yorkshire – with full funding settlements set to
be announced shortly.
Page 237 of 260

Page 238

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Towards policy priorities,
devolved powers and funding
22Page 238 of 260

Page 239

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
The change proposition on one page:
Unlocking and sustaining prosperity via
deepened devolution
23
ESES City Deal Theme
Housing
Transport
Skills
Culture
Innovation
Housing
delivery
Transport,
Infrastructure
and planning
Skills and
Labour
Markets
Culture and
Tourism
Innovation
and enterprise
Public Service Reform
Long term pooled funding and Fiscal devolution
Enhanced governance & ways of working
Underpinned by
Devolved leadership and decision making through a maintained
and broadened remit across six core thematic policy areas:
Energy
and
electrific
ation
Trade,
Investment
and
Internationa
lisation
Potential future policy areas:
Other
adjacent
policy
remits?
Powers and funding: No additional powers
and a time-limited pot of investment funding
that is now coming to an end
Powers and funding: New additional powers devolved from the Scottish government
and from the UK Government, with longer-term, integrated and flexible funding
settlements that allow for certainty and efficiencies in delivery
Climate
Resilience and
Natural Capital
Delivering broad-based prosperity for all ESES residents
Poverty
reduction
Page 239 of 260

Page 240

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Housing delivery
24
Activities Powers Funding
➢ Use of an infrastructure-first approach to unlock
large housing sites for sustainable development
➢ Use of long-term funding certainty to underwrite
investment and manage risk over time
➢ Pilots of place-based business cases
➢ Strategic capacity to identify where regional
intervention is needed to unlock strategic sites
that are too large or complex for individual
councils alone (capacity)
➢ Planning co-ordination, potentially including a
non-statutory spatial development strategy
➢ ESES wide principles approach to Section 75
agreements to provide certainty for prospective
investors
➢ Potential power to shape or integrate any future
housing agency with regional and council
delivery structures
➢ Devolution of public sector land including
commercial development of railways and
stations and utility-owned land
➢ Development Corporation powers and
collectively exercised CPO/land assembly
powers with funding to back development
incentives
➢ Longer-term certainty over affordable housing
(building over time from co-ordination of existing
funds to full devolution of delivery)
➢ Fiscal tools that take forward an Infrastructure
Levy, allowing upfront infrastructure investment
to be repaid from future growth or value uplift
(ranging from BRR to the development of a
specific Council Tax supplement)
➢ Devolution of brownfield funding streams and
enabling infrastructure
Outcomes:  Improving housing affordability and affordable housing delivery; Support for labour markets and public sector/key workers; Reduced viability
gaps for major sites; Closer alignment between housing growth and infrastructure
The case for change:
➢ Housing affordability and supply constraints are becoming barriers to economic growth and public sector recruitment
➢ Infrastructure costs are holding back housing delivery, with transport and enabling infrastructure often sitting outside developer viability
➢ Misaligned incentives over who pays / benefits & complex governance
Page 240 of 260

Page 241

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY 25
Activities Powers Funding
➢ Alignment between planning and transport, with an
integrated non-statutory spatial development plan
➢ Co-ordination and mapping of digital infrastructure
opportunities and barriers, including in rural areas
➢ Deliver the Regional Transport Strategy and build a
transport masterplan
➢ Existing regional transport partnership being
integrated, with enhanced powers, into the proposed
new regional structures and governance
➢ Develop and fund a long-term regional transport
programme working towards a regional mass transit
network, including future light rail / tram extensions,
regional bus strategy, and EV collaboration, while
progressing rail station and rail schemes where
business cases are strong but funding is unresolved
➢ Stronger local decision-making role on key transport
and infrastructure projects, including modal shift
priorities.
➢ Devolution of control (or joint co-ordination) of local
rail stations
➢ Ability to deliver end to end S75 contributions,
monitor progress, and accountability
➢ Multi-year integrated transport infrastructure
investment funding rather than annual grant letters,
with integration of funding from existing Scotland-wide
agencies, in particular Transport Scotland. This should
include potential funding for mass transit, active and
sustainable travel, and bus and road-based
infrastructure
➢ Multi-year and sustainable revenue funding settlement,
including current revenue funding lines for bus
programmes
➢ Fiscal tools to retain or capture some fiscal upside
from transport-enabled growth (link to housing,
transport-specific infrastructure levies, LVC
mechanisms) and an infrastructure levy
Outcomes: Reduced congestion and improved public transport reliability; Better alignment between transport, housing and employment; Greater modal
shift where viable, reducing car dependency; More visible value for residents from public investment, increased economic inclusion
The case for change:
➢ Fragmented responsibility across Transport Scotland, Network Rail, ScotRail, councils and landowners makes delivery slow and complex, holding up major
projects like the Sheffihall Roundabout
➢ Major infrastructure decisions are not sufficiently aligned with housing growth, economic sites or public service needs.
➢ Existing regional bodies like SESTran can identify priorities and develop strategies but do not have the powers to deliver, while key public transport operators
(including Lothian buses) struggle to secure joined-up decision-making on, for example, new route development to suburban developments
Transport, infrastructure and planning
Page 241 of 260

Page 242

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY 26
Activities Powers Funding
➢ Continue to strengthen delivery at the LA level
by retaining and expanding Local Employability
Partnerships, with regional co-ordination and
commissioning (see right-hand side), and
gradually expanding role over time
➢ Deliver IRES 2027+
➢ Align apprenticeships and FE provision with
sectors experiencing shortages
➢ A stronger role for ESES in labour market
forecasting, health and social outcomes, and
economic intelligence
➢ Reduce duplicated advisory or brokerage
functions where councils or regional partners
could perform them more efficiently
➢ Devolved control over apprenticeships
planning, the apprenticeship levy and
identification of priority shortage sectors such
as green construction skills
➢ Leadership and development of skills planning
functions held at the regional level, aligning
provision with real local job market demand
➢ Regional commissioning or stronger regional
influence over FE and skills provision, including
over overall training volumes, course
allocations and course provision
➢ Increased access to individual learner data and
client tracking
➢ Longer-term multi-year funding settlements for
skills and employment programmes (including
any successor to UKSPF and programmes
focused on NEETs) to deliver IRES2027+
Outcomes: Better alignment between skills supply and employer demand; More efficient use of public skills funding; Improved labour market
participation and stronger employment pathways for residents across the whole region
The case for change:
➢ Persistent skills shortages are a constraint on growth, including in construction and other growth-enabling sectors.
➢ As highlighted by the Withers Report, the skills landscape is fragmented, with duplication between national bodies, and local/regional actors, and not aligned with
regional labour market needs
➢ Short-term and siloed funding limits delivery ability and capacity building
Skills and Labour Market
Page 242 of 260

Page 243

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY 27
Activities Powers Funding
➢ Build strong evidence base on the region’s
strengths and economic narrative, supported
through a regional intelligence hub
➢ Develop a stronger regional inward
investment proposition for high-growth
sectors, including AI and other sectors where
the region has existing or emerging strengths
➢ Use regional scale to package investable
propositions, including strategic sites,
innovation assets, energy opportunities and
sector clusters, and joint collaboration with
Glasgow City-Region on innovation
➢ Development of public-private infrastructure
funding partnerships for major sites
➢ Greater regional influence over innovation and
enterprise programmes and commissioning
delivered via Scottish and UK government. This
should include the ability to integrate innovation
funding with skills, infrastructure and economic
development priorities
➢ Integration of delivery of innovation and business
support into regional partnership structrues, with
a stronger role for ESES and accompanying
capacity for inward investment and
internationalisation policy for ESES
➢ Direct devolution of a proportion of Innovate UK
and UKRI funding and deepened collaboration,
embedded capacity and data sharing with the two
UK-wide innovation bodies, and reducing the role
of competitive bidding processes in assigning
funds
➢ Fiscal powers or funding freedoms that allow the
region to invest in strategic sites, innovation
infrastructure and sector propositions
➢ Regionalisation of R&D tax incentives to align with
specific costs and commercial space challenges
in Edinburgh
➢ Devolution of next phase of Local Growth Funding
(UK Shared Prosperity Fund Successor) to ESES
➢ Patient capital/revolving investment fund
controlled at the regional level
Outcomes: Increased international competitiveness in cutting edge fields; Place-centered innovation ecosystem development; More coherent support for
growth sectors, with less duplication across agencies
The case for change:
➢ Underperforming in attracting major high-growth investment, including in AI
➢ Existing economic development and innovation activity fragmented across agencies, funding pots and geographies
➢ Too much generic enterprise support and not enough strategic investment focus
Innovation and Enterprise
Page 243 of 260

Page 244

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY 28
Activities Powers Funding
➢ Investing in natural capital and assets to support
public health, workforce productivity, better
amenities and environmental resilience.
➢ Aligning heritage as part of the effective
management and enhancement of the ecological
and cultural network.
➢ Collaboration with public utilities providers on major
infrastructure and planning for energy and water
usage at the ESES footprint.
➢ Capacity-building and policy development in
adjacent policy fields, including circular economy, 
the growth of the low-carbon goods and services
and Green Tech sectors.
➢ A named role and remit for ESES in planning and co-
ordinating climate resilience and risk management for
the region
➢ Devolution of existing funding streams on natural
capital and nature restoration to the ESES footprint
➢ Greater influence over climate adaptation funding
streams delivered Scotland-wide, including retrofit
funding programmes
Outcomes: Improved nature restoration and biodiversity with associated health benefits, increased climate resilience, safeguarding critical infrastructure
from climate-related disruption, improved value for money in delivery of climate resilience programmes and activities
The case for change:
➢ Climate resilience, adaptation and management requires co-ordination across wider geographies, with impacts from climate disruption spanning across local
authority boundaries
➢ Climate change poses a significant threat to economic prosperity and to ESES residents, including through flooding, heatwaves and wildfires
➢ Regional delivery can bring closer co-ordination with infrastructure and planning, achieving better value-for-money and efficiencies in delivery
Climate Resilience and Natural Capital
Page 244 of 260

Page 245

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY 29
Activities Powers Funding
➢ Coordinate tourism and cultural infrastructure so
that visitor growth is connected to transport, place-
making and local economic development, as part
of a broader growth framework.
➢ Develop a regional visitor economy strategy
focused on spreading benefits beyond Edinburgh,
by building stronger regional propositions around
rural, coastal, border, heritage, cultural and visitor
economy assets that complement Edinburgh’s
international draw.
➢ Working with UK (including DCMS ALBs) and
Scottish Government to capitalise on
internationally significant cultural assets such as
Edinburgh International Festival.
➢ Greater regional influence over funding, promotion,
infrastructure, sustainable tourism  and destination
development
➢ Greater influence around creative, cultural and
visitor economy skills provisions via skills
programmes and fundings (see Skills and Labour
markets section)
Outcomes: Reduced pressure from over-concentration of visitors in Edinburgh; Better distribution of visitor spend and cultural economy benefits
across the wider region
The case for change:
➢ Uneven pressure across ESES in terms of visitor economy demand
➢ Visit Scotland operates at national footprint without a significant focus on regional visitor economy role
➢ No clear single owner for driving tourism and visitor economy growth
Culture and Tourism
Page 245 of 260

Page 246

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
In summary: Proposition key powers and funding
30
Theme Key devolved powers and funding requests
Housing
delivery
➢ Longer-term certainty over affordable housing (building over time from co-ordination of existing funds to full devolution of delivery)
➢ Devolution of brownfield funding streams and enabling infrastructure
➢ Devolution of public sector land including commercial development of railways and stations and utility-owned land
➢ Development Corporation powers and collectively exercised CPO/land assembly powers with funding to back development incentives
Transport,
infrastructure
and planning
➢ Multi-year integrated transport infrastructure investment funding rather than annual grant letters
➢ Multi-year and sustainable revenue funding settlement, including current revenue funding lines for bus programmes
➢ Fiscal tools to retain or capture some fiscal upside from transport-enabled growth
Skills and
Labour Market
➢ Longer-term multi-year funding settlements for skills programmes (including any successor to UKSPF)
➢ Devolved control over apprenticeships planning, the apprenticeship levy and identification of priority sectors
➢ Regional commissioning or stronger regional influence over FE and skills provision
➢ Leadership and development of skills planning functions held at the regional level
Innovation and
Enterprise
➢ Devolution of UK and Scottish remits on inward investment, business support and innovation delivery
➢ Devolution of next phase of Local Growth Funding (UK Shared Prosperity Fund Sucessor) to ESES
➢ Direct devolution of a proportion of Innovate UK and UKRI funding and deepened collaboration, embedded capacity and data sharing with the
two UK-wide innovation bodies
➢ Patient capital/revolving investment fund controlled at the regional level
Climate Resilience
and Natural Capital
➢ Collaboration with public utilities providers on major infrastructure and planning for energy and water usage at the ESES footprint
➢ Greater influence over local implementation of climate adaptation funding streams that are currently delivered Scotland-wide, including
retrofit funding programmes
Tourism and
Culture
➢ Greater regional influence over funding, promotion, infrastructure and destination development
➢ Greater influence around creative, cultural and visitor economy skills provisions via skills programmes and fundings
Page 246 of 260

Page 247

EMERGING PROPOSITION – DOES NOT REFLECT AGREED POLICY
Finlaison House
15-17 Furnival Street
London
EC4A 1AB
020 3865 3082
1 St Peter’s Square
Manchester
M2 3DE
0161 8833736
At Metro Dynamics, we care about places, our clients, and
our colleagues.
We are an independent organisation, curious about our
work, and collaborative in our approach. We strive to make
a difference in all that we do.
Page 247 of 260

Page 248

Page 248 of 260

Page 249

Midlothian Council
Tuesday 22 September 2026
Item No 8.10 
Schedule of Meeting Dates:  August 2027 - June 2029 
Report by Saty Kaur, Chief Officer Corporate Solutions 
Report for Decision 
1 Recommendations 
Council is recommended to approve the schedule of meetings dates for
2027/28 and 2028/29 as detailed in Appendix B. 
2 Purpose of Report/Executive Summary 
To update the future meeting schedule for the next two academic years
for the meetings of Council and its Committees. 
Date Monday 24 August 2026 
Report Contact:
Nicola Thorburn, Democratic Services Team Leader
Nicola.Thorburn@midlothian.gov.uk 
Page 249 of 260

Page 250

3 Background/Main Body of Report 
3.1 Appendix B presents the proposed meeting cycle for two years, August
2027 - June 2028 and August 2028 - June 2029. The schedule takes
into account the academic holidays and has been drafted to not hold
meetings during Christmas/New Year, February and October midterms,
Easter and summer holidays. Where possible it is drafted so papers
are not issued during these times, with some exceptions where papers
are issued on the last day of the holidays in order to meet Standing
Orders for notice of meetings. 
3.2 The Council currently operates on a six-weekly cycle of most of its
governance meetings, with the exception of Audit Committee and
Police and Fire and Rescue Board which meet 4 times per annum. 
3.3 The schedule includes entries pertaining to Licensing. These are not
included in the Scheme of Administration but have been contained in
the schedule for information and ease of planning.  Council should note
that the approval of these dates will be by Licensing Board. 
3.4 Council should note that meetings of the Midlothian Integration Joint
Board (MIJB) and its sub-Committees are not included. The schedule
of dates for these meetings is approved by the MIJB. 
Page 250 of 260

Page 251

4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
None 
4.2 Digital 
Covered by existing digital solutions. 
4.3 Risk  
Good governance requires Standing Orders to be kept up to date and
meeting schedules to be prepared in advance. 
4.4 Ensuring Equalities (if required a separate IIA must be completed) 
This report does not recommend any change to policy or practice and
therefore, does not require an Equalities Impact Assessment. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications
Appendix B – Proposed Schedule of Meeting Dates August 2027/June
2028 and August 2028/June 2029 
Page 251 of 260

Page 252

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan
Not applicable 
A.2 Key Drivers for Change
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value
The report does not directly impact on Delivering Best Value but the
absence of a schedule of meetings may result in delays in the ability to
carry out proper scrutiny and ensure Best Value is secured in decisions
made by the Council. 
A.5 Involving Communities and Other Stakeholders
The report does not directly relate to involving communities 
A.6 Impact on Performance and Outcomes
The absence of a schedule of meetings may impact on Midlothian
Council’s performance and outcomes. 
A.7 Adopting a Preventative Approach
Not applicable 
A.8 Supporting Sustainable Development
Not applicable 
Page 252 of 260

Page 253

Proposed Schedule of Meetings Dates for August 2027 – June 2028
_________________________________________________________________________ 
Date Time Meeting Weeks since
last meeting
Comments
School Holidays: Wednesday 29 June 2027 – Wednesday 18 August 2027 (inclusive)
August 2027    
Wednesday 18 11.00 Business Transformation Steering Group First Meeting
after Recess
In advance of
Sep Council
Monday 23 10.00 Planning Site Visits “ 
Tuesday 24 11.00 Cabinet “ 
Tuesday 24 13.00 Planning “ 2 weeks before
LRB
Tuesday 31 10.00 JCG “ 1 week prior to
Council
School Holidays: Friday 17 September 2027 – Monday 20 September 2027 (inclusive)
September 2027    
Monday 6 10.00 Local Review Body Site Visits “ 
Monday 6 13.00 Local Review Body “ 2 weeks after
Planning 
Tuesday 7 11.00 Midlothian Council “ 
Wednesday 8  11.00 Licensing Board - 
Tuesday 14 11.00 Performance Review and Scrutiny
Committee
First Meeting
after Recess
3 weeks after
August Cabinet 
Monday 20 11.00 Police Fire and Rescue Board “ 
Tuesday 21 11.00 General Purposes “ 
Monday 27 11.00 Business Transformation Steering Group 6 In advance of Oct
Council
Tuesday 28 11.00 Audit Committee First Meeting
after Recess
Q1 reporting
October 2027    
Monday 11 10.00 Planning Site Visits - 
Tuesday 12 11.00 Cabinet 7 Q1 reporting
Tuesday 12 13.00 Planning Committee 7 3 weeks before
LRB
Thursday 14 11.00 JCG 6 
October School Holidays: Monday 18 October 2027 – Monday 25 October 2027 (inclusive)
Tuesday 26 11.00 Midlothian Council 7 
November 2027    
Monday 1 10.00 Local Review Body Site Visits - 
Monday 1 13.00 Local Review Body  7 3 weeks after
Planning
Page 253 of 260

Page 254

Date Time Meeting Weeks since
last meeting
Comments
Tuesday 2 11.00 Performance Review and Scrutiny
Committee
7 Q1 reporting 
Tuesday 9 11.00 General Purposes 7 
Monday 15 10.00 Planning Site Visits - 
Tuesday 16 13.00 Planning 5 2 weeks before
LRB
Monday 22 11.00 Business Transformation Steering Group 8 In advance of
Dec Council
Tuesday 23 11.00 Cabinet 6 Q2 reporting
Wednesday 24 11.00 Licensing Board - 
Monday 29  10.00 Local Review Body Site Visits - 
Monday 29 13.00 Local Review Body  4 2 weeks after
Planning
Tuesday 30 11.00 Audit Committee  Q2 reporting
December 2027    
Monday 6 11.00 Police Fire and Rescue Board  Meets quarterly
Tuesday 7 11.00 Performance Review and Scrutiny
Committee
5 Q2 reporting
Tuesday 7 14.30 JCG 8 
Tuesday 14 11.00 Midlothian Council 7 
School Holidays: Wednesday 22 December 2027 – Wednesday 5 January 2028 (inclusive)
January 2028    
Tuesday 11 11.00 Business Transformation Steering Group First Meeting
after Recess
In advance of
Feb Council
Monday 17 10.00 Planning Site Visits “ 
Tuesday 18 11.00 Cabinet “ 
Tuesday 18 13.00 Planning “ 2 weeks before
LRB
Tuesday 25 11.00 General Purposes “ 
Monday 31 10.00 Local Review Body Site Visits “ 
Monday 31 13.00 Local Review Body “ 2 weeks after
Planning 
February 2028    
Tuesday 1 11.00 Performance Review and Scrutiny
Committee
“ 
Monday 7 11.00 Business Transformation Steering Group 4 In advance of
February Council
(additional)
Tuesday 8 11.00 Police Fire and Rescue Board “ Meets quarterly
Wednesday 9 11.00 Licensing Board - 
Page 254 of 260

Page 255

Date Time Meeting Weeks since
last meeting
Comments
Thursday 10 11.00 JCG “ In advance of
Feb Council
Midterm School Holidays: Monday 14 February 2028 – Friday 18 February 2028 (inclusive)
February 2028 continued   
Monday 21 11.00 Audit Committee  Q3 reporting
Tuesday 22 11.00 Midlothian Council “ Budget setting
Monday 28 11.00 Business Transformation Steering Group 3 In advance of
March Council
Tuesday 29 11.00 General Purposes 5 
March 2028    
Monday 6 10.00 Planning Site Visits - 
Tuesday 7 11.00 Cabinet 7 Q3 reporting
Tuesday 7 13.00 Planning Committee 7 2 weeks before
LRB
Tuesday 14 14.30 JCG 5 1 week prior to
Council
Monday 20 10.00 Local Review Body Site Visits - 
Monday 20 13.00 Local Review Body  7 2 weeks after
Planning
Tuesday 21 11.00 Performance Review and Scrutiny
Committee
7 Q3 reporting
Tuesday 28 11.00 Midlothian Council 5 
Easter School Holidays: Friday 31 March 2028 – Monday 17 April 2028 (inclusive)
April 2028    
Tuesday 18 11.00 Cabinet 6 
Thursday 20 11.00 Business Transformation Steering Group 7 In advance of
May Council
Monday 24 10.00 Planning Site Visits - 
Tuesday 25 10.00 General Purposes 8 
Tuesday 25 13.00 Planning Committee 7 2 weeks before
LRB
May 2028    
Tuesday 2 10.00 Performance Review and Scrutiny
Committee
6 
Tuesday 2 14.30 JCG 7 1 week prior to
Council
Monday 8 10.00 Local Review Body Site Visits - 
Monday 8 13.00 Local Review Body  7 2 weeks after
Planning
Tuesday 9 11.00 Midlothian Council 6 
Page 255 of 260

Page 256

Date Time Meeting Weeks since
last meeting
Comments
Wednesday 10 11.00 Licensing Board - 
Tuesday 23 11.00 Business Transformation Steering Group 5 In advance of
June Council
Monday 29 11.00 Police Fire and Rescue Board  Meets quarterly
Tuesday 30 11.00 Cabinet 6 Q4 reporting 
June 2028    
Monday 5 10.00 Planning Site Visits - 
Tuesday 6 11.00 General Purposes 6 
Tuesday 6 13.00 Planning 6 2 weeks before
LRB
Tuesday 13 11.00 Performance Review and Scrutiny
Committee
6 Q4 reporting
Tuesday 13 14.30 JCG 6 1 week prior to
Council
Wednesday 14 11.00 Licensing Board - 
Monday 19 10.00 Local Review Body Site Visits - 
Monday 19 13.00 Local Review Body  6 2 weeks after
Planning
Monday 26 11.00 Audit Committee  Q4 reporting 
Tuesday 27 11:00 Midlothian Council 6 
Term Ends: Friday 30 June 2028 
Page 256 of 260

Page 257

Proposed Schedule of Meetings Dates for August 2028 – June 2029
_________________________________________________________________________ 
Date Time Meeting Weeks since
last meeting
Comments
School Holidays: Monday 3 July 2028 – Tuesday 15 August 2028 (inclusive)
August 2028    
Monday 21 11.00 Business Transformation Steering Group First Meeting
after Recess
In advance of
September
Council
Tuesday 22 11.00 Cabinet “ 
September 2028    
Monday 4 10.00 Planning Site Visits “ 
Tuesday 5 13.00 Planning “ 2 weeks before
LRB
Tuesday 12 11.00 Performance Review and Scrutiny
Committee
“ 
School Holidays: Friday 15 September 2028 – Monday 18 September 2028 (inclusive)
Tuesday 19 10.00 Local Review Body Site Visits “ 
Tuesday 19 13.00 Local Review Body “ 2 weeks after
Planning 
Wednesday 20 11.00 Licensing Board - 
Wednesday 20 14.30 JCG “ 1 week prior to
Council
Monday 25 14.00 Audit Committee “ Q1 reporting
Tuesday 26 11.00 Midlothian Council “ 
October 2028    
Monday 2 11.00 Police Fire and Rescue Board “ 
Tuesday 3 10.00 General Purposes “ 
Monday 9 11.00 Business Transformation Steering Group 7 In advance of
Nov Council
Tuesday 10 11.00 Cabinet “ Q1 reporting
October School Holidays: Monday 16 October 2028 – Monday 23 October 2028 (inclusive)
Tuesday 24 10.00 Planning Site Visits - 
Tuesday 24 13.00 Planning Committee 7 2 weeks before
LRB
Tuesday 31 11.00 Performance Review and Scrutiny
Committee
7 Q1 reporting
Tuesday 31 14.30 JCG 6 One week prior
to Council
November 2028    
Wednesday 1 11:00 Licensing Board - 
Monday 6 10.00 Local Review Body Site Visits - 
Page 257 of 260

Page 258

Date Time Meeting Weeks since
last meeting
Comments
Monday 6 13.00 Local Review Body  7 2 weeks after
Planning
Tuesday 7 11.00 Midlothian Council 6 
Tuesday 14 10.00 General Purposes 6 
Monday 20 10.00 Business Transformation Steering Group 6 In advance of
Dec Council
Tuesday 21 11.00 Cabinet 6 Q2 reporting
Monday 27 10.00 Planning Site Visits - 
Tuesday 28 13.00 Planning 5 2 weeks before
LRB
December 2028    
Monday 4 11.00 Police Fire and Rescue Board  Meets quarterly
Tuesday 5 11.00 Audit Committee  Q2 reporting
Monday 11 10.00 Local Review Body Site Visits - 
Monday 11 13.00 Local Review Body  5 2 weeks after
Planning
Tuesday 12 11.00 Performance Review and Scrutiny
Committee
6 Q2 reporting
Tuesday 12 14.30 JCG 6 One week prior
to Council
Tuesday 19 11.00 Midlothian Council 6 
School Holidays: Monday 25 December 2028 – Monday 8 January 2029 (inclusive) 
Date Time Meeting Weeks since
last meeting
Comments
January 2029    
Monday 22 10.00 Planning Site Visits “ 
Tuesday 23 10.00 Business Transformation Steering Group First Meeting
after Recess
In advance of
Feb Council
Tuesday 23 13.00 Planning “ 2 weeks before
LRB
Tuesday 30 10.00 General Purposes “ 
Wednesday 31 11.00 Licensing Board - 
February 2029    
Monday 5 10.00 Local Review Body Site Visits “ 
Monday 5 13.00 Local Review Body “ 2 weeks after
Planning 
Tuesday 6 11.00 Cabinet “ 
Tuesday 6 13.00 Audit Committee “ Q3 reporting
Page 258 of 260

Page 259

Date Time Meeting Weeks since
last meeting
Comments
Thursday 8 11.00 JCG “ Prior to Feb
Council
Midterm School Holidays: Monday 12 February 2029 – Friday 16 February 2029 (inclusive)
February 2029 continued   
Monday 19 11.00 Police Fire and Rescue Board “ Meets quarterly
Tuesday 20 11.00 Midlothian Council “ Budget setting
Monday 26 11.00 Business Transformation Steering Group 5 In advance of
March Council
Tuesday 27 11.00 Performance Review and Scrutiny
Committee
“ 
March 2029    
Monday 5 10.00 Planning Site Visits - 
Tuesday 6 13.00 Planning Committee 6 2 weeks before
LRB
Tuesday 13 11.00 General Purposes 6 
Monday 19 10.00 Local Review Body Site Visits - 
Monday 19 13.00 Local Review Body  6 2 weeks after
Planning
Tuesday 20 11.00 Cabinet 6 Q3 reporting
Tuesday 20 14.30 JCG 6 1 week prior to
Council
Tuesday 27 11.00 Midlothian Council 5 
Easter School Holidays: Friday 30 March 2029 – Monday 16 April 2029 (inclusive)
April 2029    
Tuesday 17 11.00 Performance Review and Scrutiny
Committee
8 Q3 reporting
Monday 23 10.00 Planning Site Visits - 
Tuesday 24 10.00 Business Transformation Steering Group 8 In advance of
May Council
Tuesday 24 13.00 Planning Committee 7 1 week before
LRB
Wednesday 25 11.00 Licensing Board - 
Monday 30 10.00 Local Review Body Site Visits - 
Monday 30 13.00 Local Review Body  6 1 week after
Planning
May 2029    
Tuesday 1 11.00 General Purposes 7 
Tuesday 15 11.00 Midlothian Council 7 
Tuesday 29 11.00 Cabinet 10 Q4 reporting –
longer gap due to
Easter
Page 259 of 260

Page 260

Date Time Meeting Weeks since
last meeting
Comments
June 2029    
Monday 4 10.00 Planning Site Visits - 
Monday 4 13.00 Business Transformation Steering Group 6 In advance of
June Council
Tuesday 5 13.00 Planning 6 2 weeks before
LRB
Monday 11 11.00 Police Fire and Rescue Board  Meets quarterly
Tuesday 12 11.00 Performance Review and Scrutiny
Committee
8 Q4 reporting
Monday 18 10.00 Local Review Body Site Visits - 
Monday 18 13.00 Local Review Body  7 2 weeks after
Planning
Tuesday 19 11.00 General Purposes 7 
Tuesday 19 14.30 JCG 13 
Wednesday 20 11.00 Licensing Board  
Monday 25 10.00 Audit Committee  Q4 reporting
Tuesday 26 11.00 Midlothian Council 6 
School Holidays: Term Ends Friday 29 June 2029   
Note: the following dates are not included: 
Midlothian Integration Joint Board (MIJB) and the MIJB Audit and Risk Committee 
Page 260 of 260