Grampian Valuation Joint Board 
Friday, 26 January 2024 
NOTICE IS HEREBY GIVEN that at a Meeting of the Grampian Valuation Joint
Board is to be held at Council Chambers, Council Office, High Street, Elgin, IV30
1BX on Friday, 26 January 2024 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Member's Interests 
3. Minute of Meeting held 3 November 2023 5 - 8
4. Internal Audit Plan for 2024-25 9 - 12
5. Revenue Budget Monitoring Statement 1 April to 31
December 2023
13 - 22
6. Financial Planning for 2024-25 and Future Years 23 - 32
7. Electoral Registration 33 - 38
8. Valuation Roll and Council Tax Valuation List 39 - 46
9. Staff Vacancies, Recruitment and Upskilling Exisiting
Staff
47 - 48
10. Question Time   
Page 1

Page 2

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - At the beginning
of the meeting, immediately following the Sederunt, the Convener will, in
terms of Standing Order 25, seek declarations from individuals on any
financial or other interests. 
**  Written Questions - Any member can put one question to the Convener
about relevant and competent business not already on the Agenda for a
meeting of the Board.  No member can put more than one question at any
meeting.  The member must give notice in writing of their question to the Clerk
4 working days prior to the meeting.  A copy of any written answer provided by
the Convener will be tabled at the start of the relevant meeting.  The member
who has put the question may, after the answer has been given, ask one
supplementary question directly related to the subject matter but no
discussion will be allowed. 
*** Question Time - At each ordinary meeting of the Board, 10 minutes will be
allowed for question time when any member can put one question to the
Convener regarding any matter within the remit of the Board. The Member
who has put the question may, after the answer has been given, ask one
supplementary question directly related to the subject matter, but no
discussion will be allowed. In the event of further information/investigation
being required in order to answer the question, the Clerk who will arrange for
a written answer to be provided within 7 working days. 
Page 2

Page 3

Grampian Valuation Joint Board 
SEDERUNT 
Councillor Donald Gatt  (Chair)
Councillor Isobel Davidson  (Depute Chair)  
Councillor Desmond Bouse  (Member)
Councillor Dell Henrickson  (Member)
Councillor Seamus Logan  (Member)
Councillor Neil MacGregor  (Member)
Councillor Ciaran McRae  (Member)
Councillor Sam Payne  (Member)
Councillor Stephen Smith  (Member)
Councillor Iain Taylor  (Member)
Councillor Lynn Thomson  (Member)
Councillor Judy Whyte  (Member)
Councillor Marc Macrae  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lindsey Robinson
Clerk Telephone: 07966 120593
Clerk Email: committee.services@moray.gov.uk 
Page 3

Page 4

Page 4

Page 5

MORAY COUNCIL 
Minute of Meeting of the Grampian Valuation Joint Board 
Friday, 03 November 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Isobel Davidson, Councillor Donald Gatt, Councillor Dell Henrickson,
Councillor Seamus Logan, Councillor Neil MacGregor, Councillor Marc Macrae,
Councillor Ciaran McRae, Councillor Stephen Smith, Councillor Iain Taylor,
Councillor Lynn Thomson, Councillor Sonya Warren, Councillor Judy Whyte 
APOLOGIES 
Councillor Desmond Bouse, Councillor Sam Payne 
IN ATTENDANCE 
The Depute Assessor and ERO (Aberdeen and Moray), Depute Assessor and ERO
(Aberdeenshire), Principal Admin Officer, Chief Financial Officer, Audit and Risk
Manager, Angela Pieri, External Auditor, and Lindsey Robinson, Committee
Services Officer. 
1.         Chair 
Councillor Donald Gatt, as Convenor of the Board, chaired the meeting. 
2.         Declaration of Member's Interests 
In terms of Standing Order 25 and the Councillor's Code of Conduct, the Board
noted the following declarations: 
Councillor Smith declared an interest in item 4 - Annual Audit Report  for Grampian
Valuation Joint Board - Financial Year Ending March 2023 as he is the Convenor of
the North East Pension Fund Board, 
Councillor MacGregor declared an interest in the same item as he is the Vice
Convenor of the North East Pension Fund Board. 
There were no further declarations from Members who were present at the meeting
where any item of business in which they have any financial or other interest is to be
dealt with. 
3.         Minutes of meeting of 30 June 2023 
The minute of the meeting of 30 June 2023 was submitted and approved by the
Board. 
Councillor Gatt raised a point of accuracy.  He stated that item 1 in the minute
should show the details of the meeting Chair. 
Item 3.
Page 5

Page 6

The Clerk advised that she would update the minute accordingly. 
4.         Annual Audit Report for Grampian Valuation Joint Board - Financial
Year Ending March 2023 
Angela Pieri, External Auditor, Grant Thornton, gave an overview of the Annual
Audit report for the financial year ending March 2023 and thanked the officers
involved for their work and support during the audit process. 
5.         Internal Audit Annual Report 2022-23 
The meeting had before it a report by the Internal Auditor advising the Board of the
internal audit work completed on the Assessor's Service for the financial year ended
31 March 2023 and providing an opinion on the adequacy of the control systems
reviewed. 
Following consideration the Board unanimously agreed to note the satisfactory audit
opinion derived from audit work completed. 
6.         Audited Accounts for Year Ending 31 March 2023 
The meeting had before it a report by the Treasurer to the Board submitting the
Annual Accounts for the the financial year ending 31 March 2023 to the Board for
consideration and approval. 
Following consideration the Board unanimously agreed: 
i. to approve that the Annual Accounts are signed, having regard to the Annual
Report from the External Auditor considered earlier in the meeting;
ii to note the variance of £347,000 for 2022/23;
iii 
that £278,000 is returned to constituent authorities leaving a balance on the
General Fund of £224,000 and an earmarked reserve for Non Domestic Rates
Reform of £472,000; and
iv to approve the Letter of Representation 
7.         Revenue Budget Monitoring Statement for the period 1 April to 30
September 2023 
The meeting had before it a report by the Treasurer to the Board inviting the Board
to consider the Revenue Budget Monitoring Statement for the period 1 April to 30
September 2023 and the Estimated Outturn position for the year 2023/24. 
Following consideration the Board unanimously agreed to note: 
i. the revenue Monitoring Statement for the period 1 April to 30 September
2023; and
ii. the estimated outturn forecast for the year 2023/24. 
8.         Financial Planning for 2024-24 and Future Years 
The meeting had before it a report by the Treasurer to the Board inviting the Board
to consider the indicative budgets that will form three year revenue Budget form
Page 6

Page 7

2024/25 onwards and to discuss the operational issues facing the Assessor &
Electoral Registration Officer in the medium to long term. 
Following consideration the Board agreed to note: 
i. current indicative three year core budget from 2024/25 and that this will be
further adjusted during the preparation of the revenue Budget for 2024/25;  
ii. various scenarios which could impact on the revenue budget and the range of
potential assumptions and risks;
iii. operational issues facing the service; and
iv. actions to be taken ahead of the budget setting meeting in January 2024. 
9.         Electoral Registration 
The meeting had before it a report by the Principal Admin Officer updating the Board
on current developments in Electoral Registration. 
Councillor Logan sought clarification on the concerns raised in the conclusion of the
report. 
In response the Principal Admin Officer advised that the Chief Executive of the
Association of Electoral Administrators has written to the Minister raising concerns
that the Online Absent Voting Applications system was not ready or fit for purpose. 
Councillor Davidson sought clarification on how people would be informed of the
need for voter ID for the UK Parliamentary Elections. 
In response the Principal Admin Officer advised that the Electoral Commission
would lead on the advertising and publicity once the election had been called. 
Following consideration the Board unanimously agreed to note the contents of the
report.  
10.         Public Performance Report 
The meeting had before it a report by the Assessor and ERO seeking approval for
the publication of the 2022/23 public performance report. 
Following consideration the Board agreed to note the contents of the report and to
the publication of the Public Performance report provided at Appendix 1. 
11.         Valuation Roll and Council Tax Valuation List 
The meeting had before it a report by the Depute Assessor and ERO (Aberdeen and
Moray) providing and operational update on the valuation services provided by the
Assessor including the performance levels achieved during the period 1 April 2023
to 25 October 2023. 
Following consideration the Board unanimously agreed to note the report. 
12.         Staff Vacancies, Recruitment and Upskilling Exisitng Staff 
Page 7

Page 8

The meeting had before it a report by the Depute Assessor and ERO
(Aberdeenshire) updating the Board on the current level of staff vacancies,
recruitment and the upskilling of existing staff. 
Councillor Warren sought clarification on whether there was a timescale in place for
the work with Moray Council HR and if not could a 6 month timescale be requested.
In response the Depute Assessor and ERO (Aberdeenshire) advised that they were
at the mercy of Moray Council HR pressures but they were keen to move it forward
and the timescale would be explored. 
Couccillor Gatt advised that he would contact Moray Council HR on the matter. 
Councillor Logan asked if the Depute Assessor and ERO (Aberdeenshire) could
bring a report back to the Board on the progress made on the engagement with
Moray Council HR and the steps taken to try and fill the vacancies. 
This was agreed. 
Following consideration the Board unanimously agreed to note the contents of the
report. 
13.         Question Time 
Future Meetings 
Councillor Davidson sought clarification on whether the meetings should be hybrid,
in person, or fully online as the wording in the meeting invitation is leaning towards it
being an in person meeting with the hybrid option as a last resort. 
In response Councillor Warren advised that the meetings were discussed at the first
meeting of the Board and it was agreed that they would be hybrid. 
Councillor Gatt advised that the Clerk would look at the wording of the invites going
forward. 
Page 8

Page 9

REPORT TO: GRAMPIAN VALUATION JOINT BOARD ON 26 JANUARY 2024
SUBJECT: INTERNAL AUDIT PLAN FOR 2024/25
BY: INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 This report advises the Board of the planned internal audit coverage of the
Assessor’s Service for the financial year ending 31 March 2024. 
2. RECOMMENDATION 
2.1 That the Board considers the proposed internal audit coverage, seeks
clarification on any points arising, and otherwise notes the report. 
3. BACKGROUND 
3.1 In terms of the Public Sector Internal Audit Standards applicable to local
government and joint boards, an internal audit plan is a requirement for each
financial year. The plan takes account of risk and is presented to the Board
to enable it to consider and comment on the proposed audit coverage.
3.2 It is recognised that whilst the Assessor’s Service is subject to considerable
operational challenges as a consequence of service demands, the costs of
the service do not change materially from year to year, with funding
predominantly met by requisition from the constituent authorities. The main
expenditure continues to relate to staffing costs with other outlays covering
annually recurring items including office rentals and service charges, ICT
infrastructure and licencing, and postage outlays. 
3.3 Additionally, as in prior years, the main financial systems of the Assessor’s
Service mirror those of the Moray Council hence audit assurances provided in
terms of the controls within the Council systems can be relied upon as being
applicable to financial systems relating to the Service. This mitigates the risks
associated with the audit and influences the nature and extent of audit work
required.
Item 4.
Page 9

Page 10

3.4 It is recognised the particular workload pressures within the Service regarding
non-domestic rates reform and changes required to the electoral system
introduced by the Elections Act 2022. In addition, it was also noted that the
number of staff vacancies remains a particular concern within the Service. As
such, the timing of the audit will be flexible and responsive to changing
circumstances. 
3.5 It is anticipated that the audit work proposed will provide the Assessor and the
Treasurer with a ‘complete’ opinion on the adequacy and effectiveness of the
internal control systems and procedures without any need for ‘a limitation of
scope’ in the audit coverage. A ‘limitation of scope’ arises when Internal Audit
is unable to draw on sufficient assurances to issue a ‘complete’ audit opinion in
accordance with the Public Sector Internal Audit Standards. This opinion will
inform the assurance statement relative to governance matters the Assessor
prepares for inclusion in the Board’s annual accounts. 
3.6 In this context, it is expected that the work to be undertaken by Internal
Audit in relation to the Service’s activities will involve: 
• Seeking confirmation that the Assessor continues to monitor and
evaluate the principal risks facing their Service;
• Analytical review of staff payroll costs and non pay expenditure for the
current and prior years and review of any material variances, including
assessment of procurement issues where applicable;
• Verification of other sources of income to include government
contributions in support of service delivery and developments;
• Confirmation of the controls relative to collection and submission of
changes to the valuation rolls and council tax lists to the constituent
Authorities;
• Review of the draft annual governance statement to ensure compliance
with published best practice guidance;
• Follow up of any prior year audit recommendations. 
3.7 Completion of this work will provide the necessary coverage for internal audit
purposes. The work is carried out independently of the external auditor for
different but complementary purposes. 
4. CONSULTATIONS 
4.1 The Assessor has been consulted in the preparation of this report. 
5. CONCLUSION 
5.1 Audit planning allows management to inform the audit activity to be
undertaken and assists the internal audit team to schedule its
work. 
5.2 This report provides members of the Board with details of the proposed
internal audit coverage which will be undertaken to provide independent
assurance on the adequacy and effectiveness of the Service’s control
environment. 
Page 10

Page 11

Author of Report: Dafydd Lewis, Internal Auditor
Background Papers: Internal Audit files
Ref:DL/GVJB/26012
Page 11

Page 12

Page 12

Page 13

REPORT TO:   GRAMPIAN VALUATION JOINT BOARD ON 26 JANUARY 2024 
SUBJECT: REVENUE BUDGET MONITORING STATEMENT FOR THE
PERIOD 1 APRIL TO 31 DECEMBER 2023 
BY: TREASURER TO THE BOARD 
1. REASON FOR REPORT 
1.1 To consider the Revenue Budget Monitoring Statement for the period 1 April
to 31 December 2023. 
1.2 To consider the Estimated Outturn position for the year 2023/24. 
2 RECOMMENDATION 
2.1  It is recommended that the Board considers and notes: 
(i) The Revenue Monitoring Statement for the period 1 April 2023 to 31
December 2023; and 
(ii) The estimated outturn forecast for the year 2023/24. 
3. CURRENT POSITION 
3.1 At its meeting on 27 January 2023, the Board agreed the Revenue Budget for
2023/24 (paragraph 4 of the Minute refers) be set at £5,210,000 and approved
the requisitions to constituent authorities of £5,034,000, with £13,000 being
funded from the Electoral reform reserve and £163,000 being funded from the
earmarked NDR reserve. 
3.2 Appendix 1 shows the monitoring position to 31 December 2023 against the
budget.  It gives details of the 2023/24 Revenue Budget, actual expenditure to
date and the variance of expenditure against budget to date.  It also shows
the estimated outturn and the estimated variance for the year. Alongside, the
variance is further split into the core and NDR reform budgets. 
3.3 Total net expenditure at 31 December 2023 is £3,396,000 which is an
underspend against budget to date of £450,000. 
Item 5.
Page 13

Page 14

3.4 There are currently 14 vacancies and recruitment is actively being carried out. 
4. YEAR TO DATE VARIANCES 
Core Budget 
4.1 Appendix 1 shows the actual to budget variances to 31 December 2023, and
also how this variance is split between core budget and NDR reform budget.
This section will first look at the core budget variances which has an
underspend to date of £312,000. 
4.2 There is £246,000 underspend against budget to date within employee costs
for core staff.  The variance arises from vacant posts mentioned above in
paragraph 3.4. 
4.3 There is an underspend on property costs of £2,000.  This is mainly due to
less being spent on repairs than had been anticipated had the move in
Woodhill House taken place and a higher spend in rent due to the move not
yet taking place. 
4.4 There is an overspend of £14,000 within Transport Costs budgets due to
mileage of canvassers. 
4.5 Budgets within Supplies and Services are under by £39,000 with the main
variance in Postages, ICT Maintenance and Printing costs; an overspend of
£37,000 in Postages and an underspend of £66,000 in ICT Maintenance and
an underspend of £10,000 in Printing & Stationery. 
4.6 Support charges are processed at 31 March as part of the year end
closedown. 
4.7 An additional grant was received of £38,909 as part of the Electoral Integrity
Programme New Burdens Funding. The purpose of the grant is to cover costs
associated with Electoral Registration Officers.  Specifically, it covers initial
upfront Grant funding for online absent vote applications, postal and proxy
voting requirements and overseas electors, and cost areas associated with
staff processing, training and voting costs. 
4.8 There are no other significant variances to report at this stage in the year. 
NDR Reform 
4.9 There is £431,000 budgeted this year for continuing the implementation of the
NDR reforms following the Barclay review. £163,000 will be funded from the
balance in the earmarked reserve with a further £268,000 included in the
requisitions from authorities. 
4.10 Of the NDR budget £394,000 is for staffing. Currently two Valuer posts and a
Clerical Officer position remain vacant. 
4.11 The remainder of the NDR budget is in Supplies & Services for ICT,
subscriptions etc., but there has been no spend to date on these areas so far.
Page 14

Page 15

4.12 Any committed and unspent NDR Reform budget has been put to the
earmarked reserve to be used to cover costs in future years. The NDR
Reform Reserve balance currently sits at £472,000, and £163,000 of this has
been included in the funding of 2023/24 expenditure. The Board will be kept
up to date on the NDR Reform expenditure, and the requirement to utilise the
reserve. 
5. ESTIMATED OUTTURN 2023/24 
5.1 Appendix 2 shows the estimated outturn and variances split between the
core and the NDR Reform budgets. 
5.2 The revenue budget is currently expected to be underspent by the year end
and at this halfway point in the year the estimated variance is an underspend
of £543,000; £379,000 of core budget and £164,000 of NDR budget. 
5.3 A substantial variance is due to ongoing vacancies within core and NDR
budgets. The estimated outturn figures are based on the current
establishment at the time of preparing this report rather than forecast filling
any of the vacant posts, due to recruitment difficulties already mentioned.
Managing the service with the current level of vacancies means that overtime
may be required and a best estimate has been included in the estimated
outturn figure. 
5.4 A pay award for 2023/24 had been included in the budget at a 5% flat rate
across all posts. The pay offer agreed between Cosla and the Scottish
Government came in higher than this percentage but due to underspends
created by vacancies the budget has been able to absorb the higher than
anticipated increase.  An overall underspend in employee costs is projected;
£305,000 in core and £144,000 in NDR reform. 
5.5 Property costs are estimating to be under budget by £19,000 this year. This is
mainly due to credit notes of £34,000 that have been received for the service
charge at Woodhill House in relation to the years ended 31 March 2021 and
31 March 2022.  This has helped to offset the higher than budgeted rental
charges that have been incurred due to the delay in moving to the new office
space in Woodhill House.  The delay is due to commitments from other parties
involved in the move within Woodhill House to be confirmed but this is
expected by the end of the year, so there should be further progress on this in
Q4 of 2023/24.  The relocation will create budget savings when settled. The
Banff office has recently moved its contracts for gas and electricity to come
under the Moray Council contracts and this should help control costs going
forward. 
5.6 Staff transport costs are forecast to be slightly over budget by £11,000 in total. 
5.7 Supplies and services are forecast to be over budget by £16,000 in total. The
IT maintenance and support budget this year includes components over and
above the routine core ICT budget; including one-off start up costs while the
service move to a shared service with Aberdeenshire Council. This budget
has been carried forward from last year as the move is still to fully take place.
Page 15

Page 16

An underspend of £22,000 has been forecast in ICT maintenance and support
for both Core and NDR budgets as hardware costs had been forecast for new
employees but as mentioned in previous sections of this  report recruitment
still proves to be challenging so costs of this nature have not and are not
expected to be incurred.  Reference books are forecast to be over budget by
£7,000, this includes Armour for valuation for rating and the BCIS
subscriptions along with Register of Scotland and Westlaw costs.  Postage &
ER Printing costs are forecast to be over budget by £32,000 due to price
increases.  Forecast variances in supplies and services have been identified
in the Appendix. 
5.8 Income from sales of electoral registers occur in the second half of the year,
when the register has been published. The outturn has been estimated at
budget level. 
5.9 Of the £431,000 NDR Reform budget this year, £163,000 was budgeted to be
funded from the earmarked reserve with £268,000 requisitioned from
authorities. From the estimated outturn figures, it looks as if the reserve won’t
be needed this year, and the projected underspend would also go to the
earmarked reserve, bringing the balance to £473,000. 
5.10 It is not expected that use of the General Fund will be needed in 2023/24. 
New Burdens Funding 
5.11 In 2022/23, all Electoral Registration Officers and Returning Officers were
advised by letter of New Burdens funding being provided for the introduction
of the Electoral Integrity Programme (EIP) from May 2023 across the UK. The
EIP falls under the new Elections Act 2022 which contains measures such as
introducing the requirement to show ID at polling stations, improving the
accessibility of elections to make it easier for people with disabilities to vote,
and bringing in changes to postal and proxy voting. 
5.12 The funding will provide local authorities and Valuation Joint Boards the
resources to deliver the changes required to cover additional staff, training
and equipment costs. £13,000 was received in 2022/23 and a further £14,000
in 2023/24 specifically for this.  £13,000 has been carried forward into
2023/24. 
5.13 As mentioned in para 4.7, £38,909 has also been received in 2023/24 towards
expenditure incurred through the implementation of the Elections Act 2022. 
6. CONCLUSION 
6.1 The total net expenditure as at 30 September 2023 is £3,396,000 giving an
underspend against budget to date of £450,000; £312,000 in core budgets
and £138,000 in NDR Reform budgets. 
6.2 The estimated outturn is an underspend of £543,000.  Of this, £379,000 is a
variance from the core budget which would be returned to authorities, and
£164,000 from the NDR Reform budget, with £1,000 requisitioned from the
authorities going to the NDR Reform earmarked reserve.
Page 16

Page 17

6.3 The Assessor and his Senior Management Team closely monitor and control
budgets in order to keep within agreed levels and generate savings wherever
possible throughout the year. 
Author of Report:   Susan Alexander, Accountant.
Background papers:  Held within Accountancy Section, Moray Council 
Date:    12 January 2024
Page 17

Page 18

Page 18

Page 19

APPENDIX 1
GRAMPIAN VALUATION JOINT BOARD REVENUE MONITORING STATEMENT
FOR PERIOD 1 APRIL TO 31 DECEMBER 2023
Line Estimated Estimated Core Budget NDR Budget Total
No. Total Budget Budget to Date Actual Variance Outturn Variance Variance Variance Variance
2023/24 2023/24 31-Dec-23 31-Dec-23 2023/24 2023/24 31/12/2023 31/12/2023 31/12/2023
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Employee Costs
1 Salaries 3,038 2,279 2,015 264 2,714 324 180 84 264
2 National Insurance 319 239 207 32 285 34 24 8 32
3 Superannuation 584 438 386 52 513 71 36 16 52
4 Additional Pensions 24 18 15 3 24 - 3 - 3
5 Other Employee Costs 7 6 6 - 7 - - - -
6 Training 33 16 9 7 13 20 3 4 7
Total Employee Costs 4,005 2,996 2,638 358 3,556 449 246 112 358
Property Costs
7 Accommodation Charges 299 239 252 (13) 290 9 (13) - (13)
8 Repairs and Maintenance 23 17 2 15 8 15 15 - 15
9 Energy Costs 15 11 11 - 19 (4) - - -
10 Cleaning 4 3 3 - 5 (1) - - -
Total Property Costs  341 270 268 2 322 19 2 - 2
Transport Costs
11 Staff Travel and Subsistence 45 34 46 (12) 56 (11) (14) 2 (12)
Total Transport Costs 45 34 46 (12) 56 (11) (14) 2 (12)
Supplies & Services
12 Equipment, Furniture & Materials 9 7 6 1 9 - - 1 1
13 PPE 1 1 - 1 1 - 1 - 1
14 Reference Books 9 9 13 (4) 16 (7) (4) - (4)
15 Printing & Stationery 18 14 4 10 16 2 10 - 10
16 Postages & ER Printing 330 248 285 (37) 362 (32) (37) - (37)
17 Telephones 7 5 7 (2) 8 (1) (2) - (2)
18 Advertising 1 1 1 - 1 - - - -
19 IT Maintenance & Support 338 253 174 79 316 22 66 13 79
20 Valuation Appeals 30 - - - 30 - - -
21 Members' Allowances 4 - - - 4 - - -
22 Fees, Charges & Subs 8 6 1 5 6 2 2 3 5
23 Specialist Services 29 22 12 10 29 - 3 7 10
24 Conference Fees & Subsistence 2 2 - 2 2 - 2 2
25 Other Supplies & Services 4 3 5 (2) 6 (2) (2) (2)
Total Supplies & Services     790 571 508 63 806 (16) 39 24 63
Support Services
26 Lead Authority Charge 62 - - - 65 (3) - -
Total Support Services 62 - - - 65 (3) - - -
Gross Expenditure 5,243 3,871 3,460 411 4,805 438 273 138 411
Income
27 Sales and Other Income (15) (11) (11) - (15) - - - -
28 Government Grant (14) (14) (53) 39 (53) 39 39 - 39
29 Interest on Revenue balances (4) - - - (70) 66 - - -
Total Income  (33) (25) (64) 39 (138) 105 39 - 39
30 Net Expenditure 5,210 3,846 3,396 450 4,667 543 312 138 450
Funded from Reserves
31 NDR Reform (163) - - - - (163) - - -
32 Electoral Reform (13) (13) -
Total Funded from Reserves (176) - - - (13) (163)
33 Requisitions (5,034) (3,776) (3,776) - (5,034) - - - -
33 (Surplus)/Deficit for Year - 70 (380) 450 (380) 380 312 138 450
Breakdown of Actual Variance
Item 5.
Page 19

Page 20

Page 20

Page 21

APPENDIX 2
GRAMPIAN VALUATION JOINT BOARD BUDGET
FOR PERIOD 1 APRIL TO 31 DECEMBER 2023
Line Estimated Estimated Estimated Estimated
No. Total Budget Budget Actual Outturn Variance Budget Actual Outturn Variance
2023/24 2023/24 31-Dec-23 2023/24 2023/24 2023/24 31-Dec-23 2023/24 2023/24
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Employee Costs
1 Salaries 3,038 2,738 1,874 2,523 215 300 141 191 109
2 National Insurance 319 290 193 265 25 29 14 20 9
3 Superannuation 584 526 359 476 50 58 27 37 21
4 Additional Pensions 24 24 15 24 - - - -
5 Other Employee Costs 7 7 6 7 - - - -
6 Training 33 26 9 11 15 7 - 2 5
Total Employee Costs 4,005 3,611 2,456 3,306 305 394 182 250 144
Property Costs
7 Accommodation Charges 299 299 252 290 9 - - - -
8 Repairs and Maintenance 23 23 2 8 15 - - - -
9 Energy Costs 15 15 11 19 (4) - - - -
10 Cleaning 4 4 3 5 (1) - - - -
Total Property Costs  341 341 268 322 19 - - - -
Transport Costs
11 Staff Travel and Subsistence 45 40 44 53 (13) 5 2 3 2
Total Transport Costs 45 40 44 53 (13) 5 2 3 2
Supplies & Services
12 Equipment, Furniture & Materials 9 8 6 8 - 1 - 1 -
13 PPE 1 1 - 1 - - - - -
14 Reference Books 9 9 13 16 (7) - - - -
15 Printing & Stationery 18 18 4 16 2 - - - -
16 Postages & ER Printing 330 330 285 362 (32) - - - -
17 Telephones 7 7 7 8 (1) - - - -
18 Advertising 1 1 1 1 - - - - -
19 IT Maintenance & Support 338 320 174 314 6 18 - 2 16
20 Valuation Appeals 30 30 - 30 - - - - -
21 Members' Allowances 4 4 - 4 - - - - -
22 Fees, Charges & Subs 8 4 1 4 - 4 - 2 2
23 Specialist Services 29 20 12 20 - 9 - 9 -
24 Conference Fees & Subsistence 2 2 - 2 - - - - -
25 Other Supplies & Services 4 4 5 6 (2) - - - -
Total Supplies & Services     790 758 508 792 (34) 32 - 14 18
Support Services
25 Lead Authority Charge 62 62 - 65 (3) - - - -
Total Support Services 62 62 - 65 (3) - - - -
Gross Expenditure 5,243 4,812 3,276 4,538 274 431 184 267 164
Income
26 Sales and Other Income (15) (15) (11) (15) 0 0 0 0 0
27 Government Grant and recharges (14) (14) (53) (53) 39 0 0 0 0
28 Interest on Revenue balances (4) (4) 0 (70) 66 0 0 0 0
Total Income  (33) (33) (64) (138) 105 0 0 0 0
29 Net Expenditure 5,210 4,779 3,212 4,400 379 431 184 267 164
30 Funded from Reserves
31 NDR Reform (163) 0 0 0 0 (163) 0 0 (163)
32 Electoral Reform (13) (13) 0 (13) 0
32 Requisitions (5,034) (4,766) (3,575) (4,766) 0 (268) (201) (268) 0
0
33 (Surplus)/Deficit for Year 0 0 (363) (379) 379 0 (17) (1) 1
Core Budget NDR Reform Budget
Item 5.
Page 21

Page 22

Page 22

Page 23

REPORT TO:   GRAMPIAN VALUATION JOINT BOARD ON 26 JANUARY 2024 
SUBJECT: FINANCIAL PLANNING FOR 2024/25 AND FUTURE YEARS 
BY:  TREASURER TO THE BOARD 
1. REASON FOR REPORT 
1.1 To consider the budgets that will form the three year Revenue Budget from
2024/25 onwards, and to discuss the operational issues facing the Assessor &
Electoral Registration Officer (ERO) in the medium to long term. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Board considers and: 
(i) Approves the budget for 2024/25 
(ii) Notes the current indicative budget for 2025/26 onwards and that
this will be further adjusted during the preparation of the Revenue
Budget for 2025/26; 
(iii) Notes Various scenarios which could impact on the revenue
budget and the range of potential assumptions and risks; and 
(iv) Notes Operational issues facing the service 
3. BACKGROUND 
3.1 The main issues for the Assessor’s service to be addressed in setting the
budget are: 
• Financial uncertainty in key areas, particularly salaries and accommodation
• Level of staff turnover/challenges in recruiting and retaining staff
• Implementation of  NDR reform
• Implementation of changes brought in by Elections Act 
Item 6.
Page 23

Page 24

3.2 At the Board meeting on 3 November 2023 (paragraph 8 of the Minute refers),
the Board were presented with a draft three year budget for discussion. The
report included the NDR reform budget, identified separately in the appendix,
and outlined various scenarios for the pay award, with the mid-point 5% built
into the indicative budget. Other areas for discussion included accommodation
costs and in particular the move to a new office suite within Woodhill House.
IT support services were also presented, with possible savings reflected in
2024/25. This report will bring the Board up to date on matters arising since
the last meeting, and amend the proposed budget as required. 
4. CURRENT POSITION 
4.1 The Revenue Monitoring report to 31 December 2023, in a separate report to
this Board meeting, discusses the reasons for variances that are having an
effect on the service. There is a high level of uncertainty regarding key
variables in the budget, including accommodation plans, and these issues will
be considered and built into financial planning over the coming months. They
are discussed in more detail below. 
5. BUDGET PROPOSALS 2024/25 
5.1 Appendix 1 shows the current indicative core budget for each of the three
years ahead. Funding to cover the cost of implementing NDR Reform is
included within the local government settlement, and these have been shown
in Appendix 1, alongside the core budget, to distinguish between movements
in the current core budget. 
Salaries and Recruitment 
5.2 Salaries and employers’ on-costs make up approximately 77% of the net
expenditure budget of the service. The service is reliant on recruiting and
retaining professional staff in order to carry out its statutory functions.
However, it has regularly been reported in the budget monitoring reports to
the Board that the recruitment of staff is a difficulty for the service, and is
believed to be a common problem in both the public and private sector. 
5.3 The budget for 2024/25 includes a 10% recruitment and vacancy adjustment
in the budget, to incorporate an average level of vacancies and the interval
that arises between filling posts. There is a risk associated with this concept,
however, as the service aims to have a full staffing complement. 
5.4 The recently agreed pay award for 2023/24 has been built-in to the starting
point for the 2024/25 staffing budget. At the end of November the North East
of Scotland Pension Fund advised that the pension fund is currently
overfunded and in order to bring this surplus down, employer contributions will
be reduced from 19.3% to 10.1% for the next 3 years when the next actuarial
review is due.  This has been factored in to the staffing budget from 2024/25. 
Page 24

Page 25

5.5 The year on year impact of a range of possible pay awards is shown in the
table below. These figures are for all establishment core posts only, excluding
the NDR posts, as these would be funded from the earmarked reserve. The
figures used include employers’ on-costs (National Insurance and
Superannuation), take account of any salary increments due and are before
any vacancy factor has been deducted.  Per the table, a 2% pay award has an
impact of around £85,000-£90,000 in salary costs in each of the next three
years, a 3% pay award increases the budgeted staff costs between £127,000
and £130,000, and a 5% pay award ranges from £204,000 to £217,000
increase per annum. The mid point assumption of 3% has been included in
the indicative budget presented in Appendix 1. 
Scenario Impact on
2024/25 budget
£000
Impact on
2025/26 budget
£000
Impact on
2026/27 budget
£000
2% pay award 90 90 85
3% pay award 128 130 127
5% pay award 204 213 217 
5.6 A vacancy factor has been applied to the Valuation Board’s staffing budget
over recent years as it takes into account the variances caused by factors
such as short and long term vacancies, and employing staff on lower salary
scale points than are budgeted for. The level of vacancy factor is considered
each year when planning the budget to take into account the current staffing
situation, vacancies etc. as well as likelihood of successful recruitment. 
5.7 As reported in the revenue monitoring report to this meeting, there are
currently 14 vacancies. Recruitment is ongoing for various levels of post and
the difficulties experienced in recruiting at qualified Valuer level is being
addressed.  One path that has been explored to fill the vacancies is where
Technicians can transfer to Valuer position via a RICS accredited course at
Napier University which is fully funded on an apprenticeship scheme at no
cost to both the employer and employee. One member of staff started this
course in September 2023 and at least one other is likely to do so in 2024. 
Given this, it is proposed to maintain the vacancy factor at 10%; the
equivalent of £410,000 of the 2024/25 gross staffing budget. The vacancy
factor is included in the proposed budgets in the appendix. 
Accommodation 
5.8 Mentioned in the budget monitoring report to this Board, the move to a new
office suite within Woodhill House has been delayed. The 2023/24 budget had
included part year savings for the new office accommodation, in anticipation of
the move taking place in 2023/24.  At the time of writing, no update has been
received from Aberdeenshire Council on the expected date a move would
take place but it is anticipated there should be progress on this in the next few
months and so a partial year saving of £34,500 has been forecast for 2024/25. 
The indicative terms are higher than had been advised during early
discussions with Aberdeenshire Council but still results in an estimated saving
Page 25

Page 26

of £46,000 for the next 3 years, with the current lease expiring on 31 March
2027.   
IT and procurement 
5.9 The Board now has a Service Level Agreement where Aberdeenshire provide
ongoing IT support services. The vacant IT Manager post was removed from
the establishment in 2022/23 as a result of the change. They have moved to a
shared IT service using, where possible, existing Aberdeenshire infrastructure
and initial costings provided to the board for start-up costs was around
£45,750 of which around £35,000 has still to be incurred. It is anticipated that
the transition to Aberdeenshire infrastructure will finalise during Q2 2024/25. 
5.10 Until the network and infrastructure are moved wholly over to Aberdeenshire,
the Assessor will need to keep paying some of the outsourced costs. The
financial implications are shown in the table below. 
5.11 If all goes to plan, potential savings within ICT will then be realised. These
figures are therefore reflected in the 2024/25 budget in the Appendix, as a
reduction in the budget of £118,000. 
Other Costs and Savings 
5.12 Staff travel costs arise from staff travelling to site inspections and canvassers’
mileage.  The proposed budget has been increased by £5,000 from 2023/24
based on current year to date spend and actual spend in 2022/23. 
5.13 The service has a minimal budget for furniture and equipment.  There may be
the requirement to replace furniture in the relocated offices in Woodhill House,
which is not currently budgeted for. 
5.14 Printing and Stationery budgets were reduced in 2023/24 and generating a
saving of £16,000 and it is proposed to keep the budget at this level going
forward. 
5.15 Postages and Electoral Registration Printing budgets have been increased by
20% in 2024/25 due to expected price increases. 
5.16 Although some of the functions of the Valuations Appeals Committee (VAC)
have moved over to the Scottish Courts and Tribunals Service the £30,000
remains a budget for costs e.g. Counsel and solicitor fees will still be required. 
2023/24
£000  
System Costs (annual cost) 80,000
Startup Costs (one off cost) 35,000
Page 26

Page 27

New Burdens Funding 
5.17 As discussed in the revenue monitoring report to this meeting, there is funding
being given to local authorities and Valuation Joint Boards for the introduction
of the Electoral Integrity Programme (EIP) from May 2023 across the UK, in
order to meet the requirements of the Elections Act 2022. New measures are
required such as introducing the requirement to show ID at polling stations,
improving the accessibility of elections to make it easier for people with
disabilities to vote, and bringing in changes to postal and proxy voting. 
5.18 The level of funding and expected costs are unknown on a year to year basis
and therefore not included in the future year’s budgets. 
NDR Reform 
5.19 The NDR Reform budget for 2023/24 was the amount expected included
within the local government settlement plus committed amounts carried
forward from previous years that was to be funded from the earmarked
reserves. 
5.20 The total funding allocated to the three authorities in 2023/24 is £268,000
(Aberdeen City £104,000, Aberdeenshire £120,000, Moray £44,000) and this,
along with £163,000 from the NDR Reform reserve is the budget. 
5.21 The current balance on the earmarked NDR reserve is £472,000 with a
forecast underspend in 2023/24 of £164,000, of which £1,000 would be
transferred to the reserve, bringing the balance to £473,000. 
5.22 The budget for 2024/25 onwards is the originally planned budget for the year
included within the local government settlement. 
Reserves 
5.23 It is not expected that the use of reserves will be required to balance spend in
2024/25 and reserves at 31 March 2024 will remain at the maximum approved
level of £239,000, after transferring the estimated surplus from 2023/24. At its
meeting on 3 March 2020 the Board approved that a minimum general
reserve of 2.5% of estimated annual net expenditure would be maintained. 
Based on the proposed 2023/24 estimated net expenditure of £4,779,000, this
equates to a minimum general reserve of £119,000. The Board therefore has
flexibility to use up to £120,000 to cushion the impact of inflation on its budget
for 2024/25. 
Risks 
5.24 Various financial risks have been identified throughout the report and are
summarised here for ease of reference.  Many of the budget savings are
dependent on external factors and phasing them into the proposed budget
Page 27

Page 28

has associated risks.  It should be noted that the total risk identified exceeds
the maximum general reserve permitted to be held. 
Risk Para ref Potential
impact
£000s
Insufficient allowance for pay award (3% to
5% including oncosts)
5.5 76
Above average vacancy factor (5% to 10%) 5.6 193
Woodhill House relocation doesn’t go ahead 5.9 35
ICT savings (realised in 2024/25) 5.11 118   
Total  422 
5.25 There are also risks arising from changing service requirements, which can
also affect the financial requirements of the service. 
5.26 The proposed 2024/25 Revenue Budget is shown in the Appendix. The
proposed net expenditure budget is a decrease of £32,000 from 2023/24, of
which £25,000 is an decrease in the core budget, and a decrease of £7,000 in
NDR Reform budget.  After use of ear-marked reserves, the total net
decrease in requisitions is £12,000 and is summarised below, separated into
core budgets that are controlled by the Board, and the budget for the NDR
Reform requirements. 
Budget movements 2024/25 £000s    
Impact on core budget    
Increases  
Staffing budget – 3% pay award, increments, travel 164
Staffing budget – Vacancy management 10
Property Costs – inc. Woodhill House relocation
savings 10
Repairs and Maintenance, cleaning 5
Reference books 4
Lead Authority Charge 3
Electoral Reform Grants reserves 65
Postages & ER Printing 104
Telephone 3
Specialist Services 1  
Decreases  
Staffing budget – Vacancy management 
Staffing budget – Superannuation (263)
IT Maintenance and Support (118)    
Net decrease in core budget 12
Page 28

Page 29

NDR reform – decrease in staffing and travel costs 7
NDR reform use of ear-marked reserve   (7)    
Total decrease in requisitions from 2023/24 to
2024/25 12 
6 REQUISITIONS 
6.1 The table below shows the requisition for each constituent authority, in order
to fund the Board’s revenue budget for 2024/25 of £5,022,000. 
6.2 The constituent authorities have previously agreed that expenditure by the
Board should be apportioned between authorities pro rata to the population
figures for each council. The population figures used are the latest published
by the National Records of Scotland in their Mid-Year Population Estimates,
for mid-2021. 
6.3 The proposed requisitions of £5,022,000 are a decrease in the 2023/24
requisitions by £12,000 in total. 
Population Requisition
%
Proposed
Requisition
2024/25
£
Requisition
2023/24
£
Decrease on
2023/24
Requisition
%
Aberdeen City 227,430 38.77 1,947,280 1,951,959 0.24      
Aberdeenshire 262,690 44.79 2,249,178 2,254,585 0.24      
Moray 96,410 16.44 825,542 827,456 0.23      
Total 586,530 100.00 5,022,000 5,034,000 0.24 
7 CONCLUSION 
7.1 Preparing the three year Revenue Budget has been a challenging task,
trying to balance the increasing demands made upon the service against
the financial constraints imposed on the public sector. 
7.2 The Assessor has proposed savings and efficiencies where possible
and has maintained the vacancy management factor within the core
staffing budget. Senior Management will continue to look for efficiencies
and savings in the budget. 
Page 29

Page 30

7.3 There is potential to use general reserves to cushion the impact of
increased budgets, where these cannot be covered by savings. 
However, this should be balanced against the potential risks to the
Board identified in this report. 
Author of Report:   Susan Alexander
Background papers:  Held within Accountancy Section, Moray Council 
Ref:     
Page 30

Page 31

GRAMPIAN VALUATION JOINT BOARD BUDGET APPENDIX 1
Line 2023-24 2023-24 2024-25 2024-25 2025-26 2025-26 2026-27 2026-27
No. Core Budget NDR Budget Core Budget NDR Budget Core Budget NDR Budget Core Budget NDR Budget
Proposed Proposed Proposed Proposed Proposed Proposed
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Employee Costs
1 Salaries 2,738 300 2,866 315 2,945 328 3,039 339
2 National Insurance 290 29 305 33 318 34 331 36
3 Superannuation 526 58 288 32 298 33 307 34
4 Additional Pensions 24 - 25 - 25 - 25 -
5 Other Employee Costs 7 - 7 - 7 - 7 -
6 Training 26 7 64 7 13 7 13 7
Total Employee Costs 3,611 394 3,555 387 3,606 402 3,722 416
Property Costs
7 Accommodation Charges 299 - 309 - 300 - 300 -
8 Repairs and Maintenance 23 - 27 - 8 - 9 -
9 Energy Costs 15 - 15 - 15 - 15 -
10 Cleaning 4 - 5 - 5 - 5 -
Total Property Costs  341 - 356 - 328 - 329 -
Transport Costs
11 Staff Travel and Subsistence 40 5 45 5 45 5 45 5
Total Transport Costs 40 5 45 5 45 5 45 5
Supplies & Services
12 Equipment, Furniture & Materials 8 1 8 1 8 1 8 1
13 Protective Clothing 1 - 1 1 1
14 Text & Reference Books 9 - 13 13 14
15 Printing & Stationery 18 - 18 18 18
16 Postages & ER Printing 330 - 434 434 434
17 Telephones 7 - 10 10 10
18 Advertising 1 - 1 1 1
Item 6.
Page 31

Page 32

19 IT Maintenance & Support 320 18 202 18 175 18 180 18
20 Valuation Appeals 30 - 30 30 30
21 Members Allowances 4 - 4 4 4
22 Fees, Charges & Subs 4 4 4 4 4 4 4 4
23 Specialist Services 20 9 21 9 21 9 21 9
24 Conference Fees and Subsistence 2 - 2 2 2
25 Other Supplies & Services 4 - 4 4 4
Total Supplies & Services     758 32 752 32 725 32 731 32
Support Services
26 Lead Authority Charge 62 - 65 - 65 - 65 -
Total Support Services 62 - 65 - 65 - 65 -
Gross Expenditure 4,812 431 4,773 424 4,769 439 4,892 453
Income
27 Sales and Other Income (15) - (15) - (15) - (15)
28 Government Grants (14) - - - - -
29 Interest on Revenue balances (4) - (4) - (4) - (4)
Total Income  (33) - (19) - (19) - (19) -
30 Net Expenditure 4,779 431 4,754 424 4,750 439 4,873 453
Funded from Reserves
31 NDR Reform - (163) - (156) - (171) - (185)
32 Electoral Reform (13) (65)
33 Requisitions (4,766) - (4,754) - (4,750) - (4,873) -
34 NDR Requisitions - (268) - (268) - (268) - (268)
35 (Surplus)/Deficit for Year - - - - - - - -
Page 32

Page 33

REPORT TO: Grampian Valuation Joint Board on 26 January 2024 
SUBJECT: Electoral Registration 
BY:  The Principal Admin Officer 
1. REASON FOR REPORT 
1.1 To update the Board on current developments in electoral registration. 
2. RECOMMENDATION 
2.1 It is recommended that the Board consider and note the content of this
report. 
3. BACKGROUND 
3.1 The annual canvass concluded on 30 November 2023 and revised registers
were published on 1 December 2023 
3.2 Major changes to the rules for registration of overseas electors, as introduced
by the Elections Act 2022 came into effect on 16 January 2024. 
3.3 Liaison with Returning Officers (RO) and election teams from the 3 constituent
authorities. 
3.4 Considering reports from Aberdeen City and Aberdeenshire election teams in
relation to the statutory review of polling districts and polling places. 
3.5 Completion of the UK Parliamentary constituency boundary changes and
progress of the Scottish Parliamentary constituency boundary changes. 
3.6 Annual signature refresh (for devolved elections) and reserved proxy write
out. 
4. ELECTORAL REGISTRATION UPDATE 
4.1 Annual Canvas 2023 
4.2 The annual canvass concluded on 30 November 2023, with all the required
follow up activity being completed prior to that date. 
Item 7.
Page 33

Page 34

4.3     The overall canvass model was the same as in recent years, the exception
being the use of e-comms sent to matched properties, which achieved a 
response rate of 29% and resulted in savings in printing and postage costs.   
4.4 The overall response rate from unmatched properties at 61.5% was little
changed from previous years and again required significant resourcing to
carry out over 50,000 house visits and just under 5,000 telephone canvass
contact attempts.   
4.5 Revised registers were published on 1 December 2023 and promptly
distributed to those individuals and organisations who are entitled to receive
them “on publication”. Further work was then carried out to distribute “on
request” copies, with current UK Parliament members provided with registers
covering their existing constituency, while other recipients received copies
based on the new boundaries.  The usual requests to purchase the register
made by credit reference agencies and the Scottish Courts and Tribunals
service were processed. 
4.6 Arrangements have been made for the printing of paper copies of the register
for distribution to local and national libraries. 
4.7 A summary of the current number of local government electors and postal
voters is shown below along with the two previous years: 
1 December
2021
1 December
2022
1 December
2023
Number of electors 448,607 448,915 452,084
Number of postal
voters
119,213 119,691 117,258 
4.8 The Elections Act 2022 
4.9     The Elections Act 2022 introduces the UK Government’s manifesto 
commitments on electoral integrity and the wider democratic system.  The
Department for Levelling Up, Housing and Communities (DLUHC) has
responsibility for the Electoral Integrity Programme (EIP) which will deliver the
provisions within the Act.   
4.10 The Business Change Network (BCN) is overseen by the Business Change
Team (BCT) within DLUHC.  The BCN enables two way flow of information
between local authorities and the BCT through Regional Leads and Change
agents. 
4.11 Following the introduction of the Online Absent Vote application (OAVA)
public facing service on 31 October 2023, along with the live launch of the
corresponding ERO processing portal (EROP), the level of uptake has been
relatively low. 
4.12 The introduction of the OAVA was a “soft launch” and has therefore alleviated
some of the anxiety around the introduction of the new rules, with staff having
time to provide clear explanations to a limited number of contacts and build
their confidence levels.
Page 34

Page 35

4.13 As previously reported, there were significant concerns raised by senior
electoral administrators regarding the readiness of the public facing
application site (OAVA) as well as the functionality provided to administrators
through the ERO Portal (EROP) which allows staff to process applications. 
There have already been improvements introduced to the processing portal
and a Digital Roadmap has been circulated to electoral administrators as part
of the ongoing work of the EIP. 
4.14 Further improvements to the OAVA site have been requested, in particular to
allow a user journey for an elector in Scotland to apply for their reserved
postal vote on line and also request a form to apply for the devolved postal
vote. 
4.15 With effect from 16 January 2024, the public facing Register to Vote site has
been amended to allow British citizens who have been living overseas for
more than 15 years to apply to register to vote at UK Parliamentary elections. 
4.16 Overseas applications received through the Register to Vote site become
available for processing in the EROP site in a similar way to the online postal
and proxy applications. 
4.17 In contrast to the launch of OAVA, the extension of the overseas franchise
has seen an immediate and significant level of response in terms of
applications, with 70 applications received by the Grampian ERO within the
first 36 hours of launch. 
4.18 This level of response may have been prompted by publicity on mainstream
media https://www.bbc.co.uk/news/uk-politics-67993306 . 
4.19 Any significant surge in applications will present challenges for staff
processing them in both the EROP and in our Electoral Management System
(EMS) as these are new and unfamiliar tasks. However, we would certainly
prefer that any elector who wishes to apply, whether they are renewing a
previous overseas declaration which has lapsed, or are registering for the first
time, do so at the earliest possible time.  This will ensure that their registration
and any accompanying absent vote will be in place well in advance of the next
general election. 
4.20 Working with Returning Officers and Election Teams 
4.21 The importance of building and maintaining strong working relationships with
the Returning Officers (RO) and their election teams is fundamental to the
successful delivery of elections.  Discussions were held with election teams in
2023, mainly in relation to the UK constituency boundary changes but also in
relation to the forthcoming UK general election and possible impacts of the
Elections Act 2022 
4.22 A meeting with all three ROs and their teams is scheduled for 24 January to
look in detail at the challenges and risks associated with the delivery of the UK
parliamentary general election and in particular any specific concerns and
risks that the ROs have and how the ERO and RO teams can address and
mitigate them. Any concerns that are unique to one RO will be discussed at
Page 35

Page 36

separate meetings with that particular RO.  As is the case for any electoral
event, regular contact and communication will continue in the run up to and
throughout the election period. 
4.23 Statutory Review of Polling Districts and Polling Places 
4.24 As specified in the Electoral Registration and Administration Act 2013,  the
next compulsory review of polling districts and polling places must take place
between 1 October 2023 and 31 January 2025. 
4.25 We were asked to comment on draft proposals by both Aberdeen City and
Aberdeenshire council election teams and would expect a similar request from
Moray Council in due course. 
4.26 Boundary Changes 
4.27 Prior to publication of the revised register on 1 December we completed the
project to apply the new UK Constituency boundary changes within the Eros
system.  This project had the added complication of having to retain a
separate breakdown of polling districts based on the current boundaries in
order to be able to output registers to sitting MPs or to run a by-election
should one arise. The project drew on the skills of IT, technical and
administration staff and was used as a training opportunity to build knowledge
and resilience for future projects. 
4.28 Work is continuing on the review of Scottish Parliamentary boundary changes. 
Local enquiries have taken place in areas where representations were made
in response to the provisional proposals.  A further consultation on revised
proposals will take place in the Spring of 2024.  The final report is due with
Scottish Ministers by 1 May 2025. 
4.29 Annual Signature Refresh and Proxy Voters write out 
4.30 The annual refresh of signatures now relates only to devolved absent votes
where the applicant must provide a new signature at the 5 year point.  Under
the new rules introduced by the Elections Act 2022, electors who hold a
reserved postal vote will be required to reapply before their postal vote
expires, with the maximum duration being 3 years.  We will write out to
electors at the appropriate time. 
4.31 A further change introduced by the Elections Act 2022 requires all proxy
voters to reapply on or before 31 January 2024 in order to retain their proxy
arrangements.  Electors were contacted in December, many by email as they
are overseas electors, and we are currently processing responses made in
the new OAVA site and on paper. 
5. CONCLUSION 
5.1 Despite there being no major electoral events, 2023 was another challenging
year with multiple changes to rules and procedures accompanied by
alterations to existing IT systems and the introduction of completely new
platforms.  All of this required external and internal training in both theory and
the use of IT systems.
Page 36

Page 37

5.2 A major round of boundary changes was an additional task, but represented a
training opportunity and was successfully delivered in time for revision of the
register at the conclusion of another successful annual canvass. 
5.3 The year ahead will be immensely challenging, not least due to the continued
speculation around the timing of a general election.  All of the new rules
around Voter ID and absent voting will be implemented for the first time and at
scale and early planning on resourcing will be key to success, as will timely
and effective communication with partners and robust messaging provided to
electors. 
Author of Report: Linda H Smith, Principal Administrative Officer 
Page 37

Page 38

Page 38

Page 39

REPORT TO: Grampian Valuation Joint Board on 26 January 2024 
SUBJECT: Valuation Roll & Council Tax Valuation List 
BY:  Depute Assessor & ERO (Aberdeen & Moray) 
1. REASON FOR REPORT 
1.1 To provide an operational update on the valuation services provided by the
Assessor including the performance levels achieved during the period 1 April
2023 to 16 January 2024 and make a recommendation on performance
thresholds for the next three years 
2. RECOMMENDATION 
2.1 It is recommended that the Board: 
i. note the operational and performance information; and 
ii. consider the recommendations in respect of the Valuation Roll
and Council Tax Valuation List performance thresholds for the
three year period 2024/25 to 2026/27 
3. BACKGROUND 
3.1 The Board’s Code of Corporate Governance sets out a framework of
performance measurement and evaluation.  This framework identifies a
number of quantitative service-related performance indicators. 
3.2 Traditionally the target performance thresholds have been reviewed every
three years.  The current thresholds for the performance indicators that have
been agreed between the Scottish Government and the Scottish Assessors
Association were last reviewed by the Board in 2021 and they therefore fall to
be reviewed again for the three year period commencing 1 April 2024. 
4. VALUATION ROLL 
4.1 Appeals 
4.1.1 Revaluation 2017 appeals 
Item 8.
Page 39

Page 40

36 revaluation appeals remain outstanding with the Upper Tribunal for
Scotland. 
4.1.2 Revaluation 2017 Running Roll appeals 
The First-tier Tribunal Local Taxation Chamber has yet to advise us as to the
full extent of the withdrawal of Covid-19 material change appeals.  Once those
are removed from the system only a few hundred appeals will remain for
disposal by the statutory deadline of 31 December 2024.  Numbers are
reducing as a result of a 3 weekly citation programme now in place. 
4.1.3 Revaluation 2023 proposals 
A significant task for the year ahead will be consideration of the 2,456
Revaluation proposals that were received last year.  The last date for their
disposal is 30 September 2025 although the majority should be determined
during the course of the 2024 calendar year. 
4.2 Running roll updates 
Appendix 1 provides performance for running roll updates to the Valuation
Roll during the period from 1 April 2023 to 16 January 2024 and the previous
two full years.  Although performance is below the target threshold it is much
improved by comparison to the two previous Covid affected years. 
5. COUNCIL TAX VALUATION LIST 
5.1 Proposals and Appeals 
There are currently 75 live Council Tax proposals and appeals, which are in
the process of being resolved either through discussion at the initial proposal
stage or by way of formal appeal hearings set by the First-tier Tribunal for
Scotland. 
5.2 Updates to the List 
Appendix 2 provides performance information for updates to the Council Tax
Valuation List.  The percentage of updates achieved within the 3 month
performance threshold is below target and once again there is clearly room for
improvement. 
5.3 Self Catering Review 
The somewhat onerous review reported at the last meeting is almost complete
with around 500 properties set to be returned to the Council Tax regime. 
6. REVIEW OF PERFORMANCE THRESHOLDS 
As performance over the last three years has been affected by the Covid
pandemic and backlogs arising therefrom, it is recommended that the same
thresholds agreed in 2021 are carried forward for the next three year period
commencing 1 April 2024. 
Page 40

Page 41

Valuation Roll 0 - 90 days 91 - 180 days Over 180 days
Existing thresholds 65% 20% 15%
Proposed thresholds 65% 20% 15% 
Council Tax 0 - 90 days 91 - 180 days Over 180 days
Existing thresholds 94% 3% 3%
Proposed thresholds 94% 3% 3% 
7. CONCLUSION 
7.1 The valuation service continues to face significant challenges, particularly
having regard to the level of valuer vacancies and the tighter Revaluation
timescale.  Nevertheless, the valuation service has performed reasonably well
in regard to maintenance of both the Roll and the List and the disposal of
outstanding appeals in both systems. 
Author of Report: Gavin M Oag Depute Assessor & ERO 
Page 41

Page 42

Page 42

Page 43

Appendix 1 
Valuation Roll Performance Indicators as at 16 January 2024 
Time period 2023/2024
(part year)
2022/2023 2021/2022 
Amendments within time periods
The number of amendments made to
the valuation roll during the year as a
result of material change of
circumstances and new subjects. 
The time period is the period between
the effective date of the amendment
and the date the corresponding
Valuation Notice is issued. 
0 - 3 Months
%
Threshold % 
3 - 6 Months
%
Threshold % 
Over 6 Months
%
Threshold % 
804
52.69%
65.00% 
305
19.99%
20.00% 
417
27.32%
15.00% 
527
30.41%
65.00% 
338
19.50%
20.00% 
868
50.09%
15.00% 
663
39.39%
65.00% 
380
22.58%
20.00% 
640
38.03%
15.00% 
Number of amendments  1,526  1,733  1,683 
Total number of entries  At 1 April  30,296  30,326  30,107 
Total Rateable Value  At 1 April  £933.59M  £1,002.00M  £1,007.00M 
Item 8.
Page 43

Page 44

Page 44

Page 45

Appendix 2 
Council Tax Valuation List Performance Indicators as at 16 January 2024 
Time Period 2023/2024
(part year)
2022/2023 2021/2022 
New Entries within Time Periods
The time period is the period between the
effective date of the amendment and the
date the corresponding Banding Notice is
issued. 
0 - 3 Months
%
Threshold % 
3 - 6 Months
%
Threshold % 
Over 6 Months
%
Threshold % 
1,647
72.84%
94.00% 
380
16.81%
3.00% 
234
10.35%
3.00% 
1,938
71.12%
94.00% 
623
22.86%
3.00% 
164
6.02%
3.00% 
2,465
83.16%
94.00% 
344
11.61%
3.00% 
155
5.23%
3.00% 
Number of New Entries Added
The actual number of new dwellings added to
the Valuation List during the year. 
2,261  2,725  2,964 
Total Number of Entries
The actual number of properties shown in the
Valuation List as at 1 April annually.  
302,364  300,067  297,597 
Adjusted to Band “D” Equivalent Original ratios  301,327  298,616  295,659 
2017 ratios 317,377 314,462 311,265     
Item 8.
Page 45

Page 46

Page 46

Page 47

REPORT TO: Grampian Valuation Joint Board on 26 January 2024 
SUBJECT: Staff Vacancies, Recruitment & Upskilling Existing Staff 
BY:  Assessor & ERO 
1. REASON FOR REPORT 
1.1 To update the Board on the current level of staff vacancies, recruitment and
the upskilling of existing staff 
2. RECOMMENDATION 
2.1 It is recommended that the Board consider and note the contents of this
report. 
3. BACKGROUND 
3.1 At the January 2023 meeting of the Board, it was requested that the Board be
updated at each meeting on the level of vacancies and the steps being taken
to improve the situation (paragraph 15 of the Minute refers). 
4. CURRENT VACANCIES 
4.1 There are currently 13 vacant posts: 
Section Establishment
(FTE)
Number of
vacancies
(FTE)
Clerical 29 1
IT 3 1
Management 3 0
Secretarial 4 2
Technical 13 1
Valuation 30 8
Total 82 13 
5. RECRUITMENT 
5.1 An appointment has been made in relation to a Valuation vacancy although
the successful candidate does not take up the post until 1 April – the vacancy
statistics at 4.1 reflect this appointment.  A further round of recruitment took
Item 9.
Page 47

Page 48

place in November.  Following interview, no appointment was made in relation
to the Technical vacancy. An interview for a valuer post has been delayed at
the applicant’s request. 
6. ACTION BEING TAKEN 
6.1 I met with a colleague from Moray HR in November to discuss the recruitment
challenges and provided information including job descriptions, person
specifications and job adverts for review, in addition to a summary of recent
recruitment outcomes for analysis.  A further meeting with Moray HR is
scheduled for 21 February to discuss and consider the review and analysis. 
6.2 We plan to advertise clerical and secretarial vacancies in early February. No
recruitment difficulties are expected in relation to these posts as there has
tended to be a reasonable number of applicants when similar posts have been
advertised.  The IT vacancy will be reviewed following the completion of the
work to move to Aberdeenshire infrastructure. Our valuation vacancies remain
advertised on our website. 
6.3 At a meeting with other Assessors on 18 January we discussed the
recruitment difficulties that we all faced and what actions were being taken to
address these. Information, including details of Modern Apprenticeship
frameworks and career progression paths, is now being collated and further
discussions and actions are planned.  In addition, it was reported that at a
recent meeting attended by two Assessors, representatives from the Royal
Institution of Chartered Surveyors and the Scottish Government gave positive
indications on doing more work nationally to promote surveying as a career
choice. Information regarding the Valuation Office Agency’s Surveying
Profession Career Framework has also been circulated amongst Assessors
for review. 
7. CONCLUSION 
7.1  The planned meeting with Moray Council HR should assist in identifying ways
to improve recruitment.  More joined up working at a national level may also
assist. In the meantime, we will continue to try to recruit through normal
established channels.   
Author of Report: Mark Adam, Assessor & ERO 