Community Planning Board 
Thursday, 23 May 2024 
NOTICE IS HEREBY GIVEN that a Meeting of the Community Planning Board is
to be held at Meeting room, Elgin Fire Station,  on Thursday, 23 May 2024 at
14:00. 
BUSINESS 
1 Sederunt 
2 Minute of the meeting held 29 February 2024  5 - 10 
3 Moray Growth Deal 2023 Annual Report
Report by Depute Chief Executive (Economy, Environment and
Finance)   
11 - 76 
4 Child Poverty Self Assessment
Report by Elizabeth Robinson, Consultant in Public Health on behalf
of Shelley Taylor, Chair of Moray Child Poverty Strategic Group   
77 - 78 
5 Partnership Community Learning and Development Plan 2024-27
Report by Depute Chief Executive (Education, Communities and
Organisational Development)   
79 - 84 
6 AOCB 
Any person attending the meeting who requires access assistance should
contact customer services on 01343 563217 in advance of the meeting. 
Page 1

Page 2

Page 2

Page 3

THE MORAY COUNCIL 
Community Planning Board 
SEDERUNT 
Mr Adam Coldwells  (Chair)
Councillor Kathleen Robertson  (Depute Chair)  
Mr George Burgess  (Member)
Mr Murray Ferguson  (Member)
Chief Superintendent Graeme Mackie  (Member)
Mr Grant Moir  (Member)
Mr David Reid  (Member)
Mr Anthony Standing  (Member)
Mrs Susan Webb  (Member)
Ms Caroline Webster  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Bridget Mustard  (Member)
Mr Andrew Anderson  (Member)
Mr Roddy Burns  (Member)
Councillor Tracy Colyer  (Outside Body Appointee)
Councillor Amber Dunbar  (Outside Body Appointee)
Mr David Hendry  (Outside Body Appointee)  
Clerk Name: Lindsey Robinson
Clerk Telephone: 07966 120593
Clerk Email: committee.services@moray.gov.uk 
Page 3

Page 4

Page 4

Page 5

MORAY COUNCIL 
Minute of Meeting of the Community Planning Board 
Thursday, 29 February 2024 
Meeting room, Elgin Fire Station, 
PRESENT 
Mr Roddy Burns, Mr Adam Coldwells, Councillor Amber Dunbar, Councillor Juli
Harris, Mr David Hendry, Councillor Sandy Keith, Councillor Graham Leadbitter,
Councillor Kathleen Robertson, Mrs Susan Webb 
SUBSTITUTES 
Fiona Robb (HIE) attended on behalf of David Reid.
Superintendent Graham Smith (Police Scotland) attended on behalf of Chief
Superintendent Graeme Mackie. 
APOLOGIES 
Mr Andrew Anderson, Mr George Burgess, Councillor Tracy Colyer, Mr Murray
Ferguson, Chief Superintendent Graeme Mackie, Mr Grant Moir, Councillor Bridget
Mustard, Mr David Reid, Mr Anthony Standing, Ms Caroline Webster 
IN ATTENDANCE 
The Depute Chief Executive (Economy, Environment and Finance); Depute Chief
Executive (Education, Communities and Organisational Development); Head of
Governance, Strategy and Performance; GIRFEC and Promise Lead Officer;
Independent Chair of the Child Protection Committee; Moray Growth Deal
Programme Manager; Sport and Culture Service Manager; Lindsey Robinson,
Committee Services Officer. 
1.         Chair 
Mr Adam Coldwells, as Chair of the Community Planning Board, chaired the
meeting. 
2.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1073, as amended, the public and media
representatives be excluded from the meeting for item 11 of business on the
grounds that it involves the likely disclosure of exempt information of the class
described in the relevant paragraphs of part 1 of Schedule 7A of the Act. 
Paragraph Number of
the Minute Paragraph Number of Schedule 7a and Reason 
11 
6 - Information relating to the financial or business
affairs of any particular person(s) 
Item 2
Page 5

Page 6

8&9 - Information on proposed terms and/or expenditure
to be incurred by the Authority 
3.         Minute of meeting held 8 November 2023 
The minute of the meeting of 8 November 2023 was submitted and approved as an
accurate record of the meeting. 
4.         Joint Inspection Of Services For Children And Young People At Risk Of
Harm In Moray 
The meeting had before it a report by the Head of Service/Chief Social Worker
providing the Board with an overview of the findings from the joint inspection of
Children’s Services by the Care Inspectorate report that was published on 23
January 2024. 
During consideration Councillor Robertson sought clarification on the timescales in
recommendation 2.1 (ii). 
In response the Independent Chair of the Child Protection Committee advised that it
would be circulated to the Chief Officers Group on 1 March 2024, and it would be
submitted to the Care Inspectorate by 5 March 2024. 
Councillor Leadbitter sought clarification as to whether there was an agreed
frequency of reporting back to the Community Planning Board. 
In response the Chief Executive advised that he was Chair of the Chief Officer
Group and that a frequency would be agreed and fed back to the Board. 
Following consideration the Board unanimously agreed: 
i. to note the overview of the findings from the joint inspection of Children’s
Services by the Care Inspectorate; and 
ii. to note the Children’s Services Partnership are developing an
improvement plan in respect of the findings. 
5.         Moray Growth Deal Full Business Case - Manufacturing Innovation
Centre for Moray 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Board to consider and approve the full
business case associated with the Manufacturing Innovation Centre for Moray
(MICM) project. 
During consideration Councillor Robertson offered her congratulations to the team
on their hard work. 
Following consideration the Board unanimously agreed: 
i. to approve the Full Business Case (FBC) in Appendix 1; and 
Page 6

Page 7

ii. to delegate authority to the Depute Chief Executive (Economy,
Environment and Finance) to make any final changes as required
following completion of the Government review process, with a view to
agreeing final version of the FBC to progress implementation. 
6.         Budget Update 
The Chief Executive Moray Council provided a verbal update on the budget agreed
by full council on 28 February 2024.  He advised that there was a drive to look for
savings across partners and the community. 
Councillor Robertson, as Council Leader, gave thanks to the elected members for
the cross party agreement. 
The Chair gave a brief overview of the NHS finances and that the budget would be
agreed at the start of April as it will be with the Government in March. 
Superintendent Smith advised that Police Scotland were facing similar budget
pressures but a positive is that recruitment has restarted, and these new officers will
start to be seen during the summer.  He stated that although budgets were tight
there will be no impact on the service delivery in Moray. 
Group Commander Hendry advised that the Scottish Fire and Rescue Service were
currently undertaking a strategic review to see where savings can be made, and that
engagement will be with the local authority and partners. 
Councillor Keith sought clarification on whether there was capacity to work across
partners above the day to day. 
In response the Chief Executive advised that the investment in workforce planning
agreed in the budget would allow for this. 
There was agreement that the agenda showed good partnership working with a lot
of trust and confidence between partners. 
7.         Systems Based Approach to Physical Activity in Moray 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) providing the Board with information
on a Systems Based Approach model for physical activity in Moray and requesting
partnership support for this approach from the Board.  
During consideration Mrs Webb sought clarification as to whether the steering group
could be widened to look at tackling obesity and healthy eating.  
In response the Sport and Culture Services Manager advised that it could be
included but that they would need help from the Board to identify the key individuals
who can help make the decisions.  
The Chair advised that if there were specific asks that these could be added to the
recommendations for agreement.  
Page 7

Page 8

Councillor Leadbitter further added that 3 political parties were represented on the
Board, and they have access to raise the issues with the national parties.  
Following consideration the Board unanimously agreed: 
i. to recognise the centrality, importance and contribution that physical
activity provides towards the achievement of the Local Outcome
Improvement Plan and Community Planning priorities; 
ii. to note the initial discussion undertaken with partner organisations in
preparation for the approach in Moray; 
iii. to endorse and agree to support work required to deliver this approach in
Moray; 
iv. to receive 6 monthly updates on progress and to champion and challenge
this work accordingly; 
v. to help overcome barriers that the steering group are unable to overcome; 
vi. to use external influence to national partners where required; and 
vii. to support in the identification of a steering group comprising of Senior
Officers to drive this approach forward. 
8.         Health and Transport Partnership Annual Report 2022-2023 
The meeting had before it a report by the Health and Transport Action Plan
Programme (HTAP) Manager updating the Board members regarding the review of
the HTAP and seeking approval of the HTAP Annual Report 2022-23.  
During consideration Councillor Dunbar sought clarification as to why NESTRANS
was included but HITRANS was not.  
In response Mrs Webb advised that she has been asked to be the Chair of this
group and will ensure HITRANS is included in any future reports.  
Following consideration, the Board unanimously agreed to note the contents of the
report and the HTAP Annual Report 2022-23. 
9.         Behaviour in Moray Schools 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) advising the Board of escalating
behaviours in schools and actions to support staff, pupils and the wider school
community as well as ongoing work with partners. 
During consideration the Depute Chief Executive (Education, Communities and
Organisational Development) advised the Board that the updated report had not
been included with the meeting papers but would be circulated afterwards.  She
further advised that there was an additional recommendation for the Board to
consider the request from the Council Education Children’s and Leisure Services
Page 8

Page 9

Committee to progress this work quickly and for another report to come to the Board
in May to include the actions to be taken to address the issues and barriers raised in
the report. 
Following consideration the Board unanimously agreed: 
i. to acknowledge National work ongoing around increased disruptive
behaviour across schools and society; 
ii. to acknowledge and endorse the local approach as set out in Appendix 1; 
iii. that this work will be led in a multi-agency approach with a short, medium
to long term action plan; and 
iv. to the request from the Council Education Children’s and Leisure Services
Committee to progress this work with urgency and require a further report
to the CPB in May to include actions to address the issues and barriers in
relation to the cross cutting points raised in the report. 
10.         AOCB 
The Board noted that there were no additional points raised. 
11.         Moray Growth Deal Full Business Cases - Business Enterprise Hub
and Housing Mix Delivery [Para 6, 8 & 9] 
The meeting had before it a report by the depute Chief Executive (Economy,
Environment and Finance) asking the Board to consider and approve the full
business cases associated with the Business Enterprise Hub and Housing Mix
Delivery projects. 
Following consideration the Board unanimously agreed: 
i. to approve the Full Business Cases in appendices 1 and 2; and 
ii. to delegate authority to the Depute Chief Executive (Economy,
Environment and Finance) to make any final changes as required following
completion of the Government review process, with a view to agreeing final
versions of the FBCs to progress to implementation. 
Page 9

Page 10

Page 10

Page 11

REPORT TO: COMMUNITY PLANNING BOARD ON 23 MARCH 2024 
SUBJECT: MORAY GROWTH DEAL 2023 ANNUAL REPORT 
BY: DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT
AND FINANCE) 
1. REASON FOR REPORT 
1.1. To provide a final version of the Moray Growth Deal’s 2023 annual report for
consideration by Board members.   
2. RECOMMENDATION 
2.1. It is recommended that the Community Planning Boardconsiders and
approves the 2023 MGD Annual Report as set out in appendix 1. 
3. BACKGROUND 
3.1. A condition associated with Growth Deal funding is that a report is produced
annually providing an overview of work undertaken in the past 12 months, with
a forward look at the year ahead.   
3.2. The production of this document is a valuable process as it provides a stock
check of the status of Deal activity and sets expectations on what will be
achieved during the year ahead.  It will also provide the foundation for
communications activity on the status of the Deal during June 2024.   
4. GOVERNANCE STEPS TAKEN TO AGREE A FINAL VERSION OF THE
REPORT 
4.1. Draft versions of the report were presented to the MGD Programme Board on
25 January and Moray Council on 6 March.  Subsequently a final version has
been prepared that was approved by the MGD Programme Board on 25 April
and a verbal update will be provided at the meeting regarding it’s submission
to the Moray Council on 22 May.   
4.2. The report was an integral part of the Deal’s annual conversation with both
Governments on 14 March 2024.  Akin to an annual audit, this is an
opportunity for Senior Officers from the Council and both Governments to
discuss the status of the Deal.   
Item 3
Page 11

Page 12

4.3. Alongside the above, the report has been shared with the Moray Economic
Partnership.   
5. OVERVIEW OF THE 2023 ANNUAL REPORT 
5.1. Appendix 1 contains a draft copy of the Moray Growth Deal’s 2023 annual
report.   
5.2. The Growth Deal started 2023 with one of the eight projects in delivery, Digital
Health.  Bus Revolution received clearance to commence in March 2023, with
a further 3 projects gaining approval from the Moray Growth Deal Programme
Board for their full business cases in the second half of the year. 
5.3. Subsequently during Q4 23/24, 2 of these projects have received clearances
from the Moray Council and both Governments to enter delivery:  Housing Mix
Delivery and the Manufacturing Innovation Centre for Moray (MICM).  The
third, Business Enterprise Hub, will complete final clearances once a £2m
revenue deficit arising from the withdrawal of a philanthropic partner has been
resolved.   
5.4. Alongside the progression of full business cases, a number of key milestones
were achieved during 2023.   
Q4 22/23 ▪ Bus Revolution project receives Council and Government clearance
to enter delivery.
Q1 23/24 ▪ Digital Health’s Demonstration, Simulation and Environment (DSE)
Space opens in UHI-Moray, providing a location for residents,
digital developers and health care professionals to collaborate on
healthcare digital applications.
▪ Fraser Livingstone Architects appointed to design phase 1 of the
Dallas Dhu (Forres) housing masterplan
▪ Enhanced on demand bus services take to the road, rebranded as
m.connect.
Q2 23/24 ▪ Moray Growth Deal Board approves full business cases for the
Business Enterprise Hub, Housing Mix Delivery and MICM projects,
enabling them to move to the next stage of scrutiny by Government
Policy Advisors and the Moray Council.  
▪ Bus Revolution project receives a Ministerial Launch in Aberlour.
Q3 23/24 ▪ LDN architects appointed as lead design partner for the
redevelopment of Elgin Town Hall as part of the Cultural Quarter
project.
▪ Drop in event held regarding regeneration plans for South Street in
Elgin, which involves the Business Enterprise Hub and Housing Mix
Delivery projects. 
5.5. Looking ahead to 2024, the pace of activity will continue to increase, with the
investment and associated services becoming more visible to residents and
businesses of the region. 
Page 12

Page 13

Q4 23/24 ▪ 4 of the Deal’s 8 projects to have entered delivery.
▪ Planning application for the Business Enterprise Hub on South
Street to be submitted.  
▪ Planning applications for Housing Mix Delivery South Street and
Dallas Dhu developments to be submitted.
▪ Design team for Grant Lodge to be appointed.  
Q1 24/25 ▪ Expansion of Bus Revolution to include the piloting of weekend
services.  
▪ Early Years STEM and Cultural Quarter projects to have submitted
their full business cases to the Growth Deal Board, with the aim that
they enter delivery during Q2 24/25.  
Q2 24/25 ▪ Launch of EY STEM outreach offer
▪ Following a delay procuring consultancy support to assist with
drafting of the Deal’s Benefit Realisation and Monitoring Plan, this
work is expected to conclude by Q2 24/25.  
Q3 24/25 ▪ Phase 1 of the Manufacturing Innovation Centre for Moray (MICM)
will open in autumn 2024 at the Forres Enterprise Park. 
▪ (In the assumption planning permission is secured) Construction of
the Business Enterprise Hub facility to commence.   
5.6. Whilst positive progress continues to be made, the Deal is currently
managing a number of risks and issues.  The most significant strategic
entries are noted below.   
- Changes to capital and revenue costs:  As project FBCs are developed,
Project Managers are adapting to a range of circumstances such as cost
inflation from OBC profiles and changing financial conditions within the
partners who are both delivering projects and contributing funding.  A
range of measures will be considered including value engineering
construction plans to reduce cost, whilst working to prevent any change
in the benefits to be realised and identifying alternative sources of
funding.   
- Staff resources available to deliver Bus Revolution:  With increased
resources required for key roles, including bus drivers and vehicle
technicians, there is a risk that recruitment does not keep up with the
numbers needed.  This has the potential to either slow down the pace of
expansion and affect the operational model of the project.  Efforts are
being made to make recruitment an ongoing rather than cyclical activity
and analysis of the constraints is to be carried out with a view to
determining what is within the Council’s control to achieve improved
outcomes.   
- Workload of key stakeholders:  With a significant number of Growth Deal
projects due to scale up during 2024, this has the potential to create
demands on a finite number of key stakeholders, some of whom will have
interests in multiple projects.  Stakeholder identification and mapping will
be carried out, with co-ordinated communications and engagement plans
to be developed across the programme and projects to ensure any peaks
of activity for particular groups are effectively managed. 
5.7. Alongside risks and issues, Moray is faced with a positive opportunity that the
Growth Deal and wider Economic Development Team are working to exploit. 
Page 13

Page 14

During the second half of 2023 the Moray received further economic
investment in the form of £18.3m from Levelling Up Fund and £20m from the
Long Term Plan for Towns Fund.  Work will be delivered during Q4 23/24 to
understand the milestones, linkages and resourcing requirements across the
three funding programmes and these will then be managed through
appropriate governance structures with a view to maximising the benefits to
be realised for Moray.   
6. CONCLUSION 
6.1. This paper introduces a final draft the Moray Growth Deal 2023 Annual
Report.  The CPB is asked to consider and approve this. 
Author of Report:  Michael Kelly, Moray Growth Deal Programme Manager 
Background Papers:     
Ref:      SPMAN-1108985784-960 / SPMAN-1108985784-959 
Page 14

Page 15

ANNUAL REPORT
2022/2023
Item 3
Page 15

Page 16

Cultural Quarter Consultation
at Elgin LibraryPage 16

Page 17

Contents 
1 Headline achievements 
2 Statement from Moray Council’s Growth Deal Lead 
3 Progress made throughout 2023 
Programme overview 
3.1.1     Summary of what the Deal is working to achieve
3.1.2     Status of Deal activity
3.1.3     Anticipated geographical spread of benefits
3.1.4     Synergies between Growth Deal activity and other   
economic development funding secured for Moray 
Project updates 
3.2.1 Bus Revolution
3.2.2 Business Enterprise Hub
3.2.3 Cultural Quarter
3.2.4 Digital Health
3.2.5 Early Years STEM
3.2.6 Housing Mix Delivery
3.2.7 MAATIC
3.2.8 MICM 
4 Forward look at activity planned for 2024 
4.1 Work to get all Growth Deal projects into delivery
4.2 PMO milestones to be achieved
4.3 Factors that require action or future delivery could be impacted
4.4 Monitoring the benefits to be realised by the Deal 
5 Financial summary 
5.2 Funding sources for Deal activity
5.2 Funding drawn down from the Scottish and UK Governments Q4
22/23 to Q3 23/24 
6 2023 communications activity 
7 Programme structure and governance activity 
7.1 Structure of Moray Growth Deal activity and Officers involved 
7.2 Summary of assurance activity progressed during 2023
7.3 Audit activity undertaken during 2023
2
3
4
4
4
5
6
7
8
8
14
18
23
28
34
38
41 
45 
45
46
47
47 
48 
48
50 
51 
53 
53
55
58
1
Page 17

Page 18

2
1. Headline achievements
Bus Revolution project receives Council and Government
clearance to enter delivery.
Digital Health’s Demonstration, Simulation and Environment
(DSE) Space opens in UHI-Moray, providing a location for
residents, digital developers and health care professionals to
collaborate on healthcare digital applications.
Fraser Livingstone Architects appointed to design phase 1 of
the Dallas Dhu (Forres) housing masterplan.
Enhanced on demand bus services take to the road,
rebranded as m.connect.
Moray Growth Deal Board approves full business cases for
the Business Enterprise Hub, Housing Mix Delivery and MICM
projects, enabling them to move to the next stage of scrutiny
by Government Policy Advisors and Moray Council.   
Bus Revolution project receives a Ministerial Launch in
Aberlour.
LDN architects appointed as lead design partner for the
redevelopment of Elgin Town Hall as part of the Cultural
Quarter project. 
Drop-in event held regarding regeneration plans for South
Street in Elgin, which involves the Business Enterprise Hub
and Housing Mix Delivery projects.
Q4 
22/23
Q3 
23/24
Q2 2
3/24
Q1 
23/24
Page 18

Page 19

3
The target is that at least seven of the
eight projects will enter delivery during
2024.  This presents a solid foundation
to start tracking the benefits Growth
Deal activity will deliver for Moray.  It
will also be important that the team
considers how activity interacts with
other funding programmes we’ve been
successful in securing during 2023
(£18.3m from the Levelling Up Fund
and £20m from the Long Term Plan for
Towns Fund), with a view to minimising
risks and maximising opportunities to
enhance benefits wherever possible.   
Cllr Marc Macrae
2 Statement from Moray Council’s Growth
Deal Lead 
Throughout 2023 I’ve seen first hand
the significant amount of work being
delivered by Council Officers and
partner organisations to progress the
Growth Deal. In briefing sessions with
fellow Members, MGD Board meetings
and in conversations with key officers,
I’m excited to see plans start to
crystalise for the facilities and services
we’re working hard to put in place. 
The Growth Deal is focusing on key
improvements we need to see in
Moray, including generating high value
skills, growing businesses, driving
innovation and making Moray a better
place to work, live and visit. 
The launch in May 2023 of the
enhanced, rebranded m.connect Bus
Revolution on demand public transport
service presented the first opportunity
for many to see how the Deal will help
residents and businesses. We’re
humbled by the response seen so far
as passenger numbers currently
exceed our targets.  This project is
critical if we are to achieve our
objective  of reducing transport
barriers to work, education and leisure.  
Our ‘on the ground’ activity will grow
significantly during 2024 and I look
forward to the opening of the
Manufacturing Innovation Centre for
Moray (MICM) Hub at the Forres
Enterprise Park next autumn in what
will be our first direct intervention for
businesses.   
Page 19

Page 20

4
3 Progress made from Deal signing on 
20 December 2021 to the end of 2022 
3.1 Programme overview 
The Moray Growth Deal was signed on 20 December 2021 by Iain Stewart MP (UK
Government), Cllr Graham Leadbitter (Moray Council) and Kate Forbes MSP
(Scottish Government).   
3.1.1     Summary of what the Deal is working to achieve 
Throughout 2023 the Growth Deal Programme Management Office (PMO) worked
with each of the eight Project Managers to ensure activity aligns with the four main
interventions the programme aims to deliver:   
Retaining and attracting young people / families (16-29 yrs) to live and work
in the area
Addressing occupational segregation and gender inequality in employment,
including the significant gender pay gap and under-employment issues for
women
The creation of new high quality jobs in existing sectors and diversify the
region’s economy into new high value areas
The creation of opportunities across Moray which help secure the future
prosperity of its many communities 
A later section of this report will focus on work being progressed to deliver a
Benefits Realisation and Monitoring Plan, with the following outcomes expected to
be delivered for the region: 
Direct and indirect creation of over 
3,500 jobs
450 of the 3,500 jobs will result
directly from Growth Deal projects
50,000 more tourists will be
attracted to Moray
Over 300 new affordable
homes will be constructed
450 businesses will be supported
to scale, increasing Moray’s economic
productivity by £82m
Creation of new and improved
educational, cultural and business
innovation facilities
Page 20

Page 21

5
A very distilled view of the Deal is that the eight main projects are working to make
interventions against three main areas of focus:   
3.1.2 Status of Deal activity
With the Scottish and UK Governments each providing funding of  £32.5m over a
10 year period, Deal activity will be delivered in a phased approach up to
December 2031.  That said, the PMO is working with project teams to create clarity
on what each project will deliver for Moray during 2024 , with a view to: 
Defining what the Deal is going to deliver when, where and how.
Maximise time over the 10 year funding period to make sure work runs as
efficiently as possible to limit expenditure peaks over and above Government
funding, which the Council committed to when the full deal was agreed in
December 2021.   
A high level summary of the status of each project is outlined below:   
Generate high value 
skills
MAATIC 
EY STEM
Create high value
employment
Make Moray a better
place to live and work
Bus Revolution
Cultural Quarter
Housing Mix Delivery
Digital Health
MICM
Business Enterprise Hub
Closure
Project
complete and
being closed
Delivery
Project in
delivery
FBC
Full business
case
OBC
Outline
business case
SOC
Strategic
outline case
High level phases of the lifecycle of projects:
Project                                                                  Lifecycle stage                                          
SOC             OBC             FBC                            Delivery     Closure
Bus Revolution                Complete   Complete    Complete                  In delivery
Business Enterprise       Complete   Complete    Awaiting
(BE) Hub                                                                      approval
Cultural Quarter             Complete   Complete    Approval expected 
Q2 24/25
Digital Health                  Complete   Complete    Complete                  In delivery
Early Years (EY) STEM    Complete   Complete    Approval expected                                                                                      
Q2 24/25
Housing Mix Delivery    Complete   Complete    Approval granted    In delivery                                                                                      
Q4 23/24
MAATIC                             Complete   Complete    In development
MICM                                Complete   Complete    Approval granted    In delivery                                                                                      
Q4 23/24
Page 21

Page 22

6
3.1.3 Anticipated geographical spread of benefits
As each project works to either draft their full business case or advances delivery
activity, a clearer picture is emerging on the geographical spread of Deal activity
throughout Moray.  The completion of project monitoring plans and a Benefits
Realisation Plan during 2024 will provide finer detail but activity has been grouped
into one of two main categories: 
Infrastructure
(physical or
virtual) with a
Moray-wide
footprint 
Moray-wide
service offerings
to be established,
operated from a
centralised facility
Virtual healthcare applications are being
developed through the Digital Health project that
aim to enable conditions to be managed at home,
reducing time spent in clinical settings.  
On demand m.connect services will be expanded
throughout Moray on a phased basis, breaking
down barriers to accessing employment
education or leisure.
Through a combination of physical hubs, a mobile
solution and outreach activity, STEM learning
targeting early years children will be available
Moray wide.
Comprising of two phases that will run up to
2031, Housing Mix Delivery will enable the
construction of affordable and private homes
throughout Moray, making it easier to access
homes to help people stay in the region. 
Support to drive growth and innovation in the
manufacturing sector through the MICM project
that will create a hub at the Forres Enterprise
Park.
The construction of a Business Enterprise Hub on
South Street in Elgin will help micro and small
businesses to grow as well as offering a variety of
education and professional learning
opportunities.
An aerospace and advanced technology campus
will be developed to support learning as well as
R&D opportunities not just for residents of Moray,
but wider afield. 
Page 22

Page 23

7
3.1.4 Synergies between the Growth Deal and other economic development
activity being progressed within Moray
The Growth Deal Team is conscious that to create the right environment for
success, alongside managing interactions between projects, activity being
progressed by other economic development programmes needs to be considered.
This is not only to ensure they have no negative impact on Growth Deal objectives
and benefits to be realised, but that any positive opportunities to drive efficiency
or to create stronger benefits are maximised wherever possible. 
At a strategic level, the Moray Growth Deal Programme Board includes
representatives from the Scottish and UK Governments, along with the Council’s
Economic Development Team and Highlands and Islands Enterprise. Collaboration
will be essential in understanding the funding landscape and to manage any
potential interactions other activity has with Growth Deal activity. 
Operationally, the Growth Deal PMO is working to generate clarity on how funding
secured for Moray during 2023 (£18.3m from the Levelling Up Fund and £20m
from the Long Term Plan for Towns Fund) interacts with planned activity, including
the impact on council staff resources, the organisations / companies needed to
support the work and the nature of communications planned with key
stakeholders including businesses and residents.   
m.connect official launch 
with Neil Gray MSP
Page 23

Page 24

8
Value £4.32m 
(£4m capital, £322k
revenue) 
Lead Body
The Moray Council
PROJECT UPDATES
3.2.1 Bus Revolution
Current status
Entered delivery in March 2023, with the
first rebranded m.connect on demand
services starting in May 2023.   
Project vision 
Increase the number of people using
public transport to get to and from rural
areas for work, education and leisure.
m.connect official launch 
with Neil Gray MSP
Page 24

Page 25

9
Project summary 
Bus Revolution is an innovative project that aims to increase the number of people
using public transport to get to and from rural areas to places of work, education
and leisure, providing a step change in availability of public transport right across
rural Moray. 
The project will provide a flexible demand responsive service, operating when and
where needed in an easy-to-use way, utilising app-based technology that will allow
journeys to be booked up to one hour before they’re needed.   
Bus Revolution will receive £4.3m in funding from the Scottish Government. This
will be used to cover the capital investment required to: 
Set-up operational systems
Provide branding and marketing
Purchase electric vehicles 
Provide associated charging infrastructure to deliver an efficient and robust
transport network. 
Headline achievements 
Since the approval of the Full Business Case in March 2023, the main focus of
activity during 2023 has been delivering phase one of the project plan starting in
Q1 23/24. Activity completed to date has included the: 
Implementation of a real time booking and management system (Op Porta,
Driver app)
Introducing new operating zone & fares models
Upgrading electronic ticketing machines (ETM)
Re-branding vehicles
Creating a service website
Production of key policy documents supporting the service
Development and execution of a marketing and communications campaign 
m.connect official launch 
with Neil Gray MSP
Page 25

Page 26

The first phase of m.connect service enhancements
introduced the following additional service provision: 
Timetabled service (309) linking Cullen-Buckie-Keith
to the rail network (0515-2030hrs Mon-Fri)
Enhanced timetable for service 366, linking
Aberlour-Archiestown-Elgin (0900-030hrs Mon-Fri)
m.connect on-demand extended operating hours
in Buckie, Keith and Speyside (0630-2030hrs Mon-
Fri) 
To date, m.connect has shown strong growth, gaining more than 5,000 additional
passengers from the same period in 2022. There has also been a shift in how the
service is booked, with almost one third of bookings now being made via the
m.connect passenger app. To date over 2,000 downloads of the app have been
registered through both Google Play and the Apple App Store. 
On 28 August 2023, The Scottish Government’s Cabinet Secretary for Wellbeing
Economy, Fair Work and Energy, Neil Gray MSP, officially launched the m.connect
service at Speyside High School. A month later, m.connect was nominated for
Scottish Council for Development & Industry (SCDI, now rebranded to ‘Prosper’)
Highlands & Islands Business Excellence Award for Innovation, where the service
was awarded second place.   
10
m.connect passenger figures m.connect booking method
7,488
17,047
Page 26

Page 27

11
Key milestones 
Risks and issues that require management by the project
team during 2024 
Effects 
If performance is not as
hoped, the Council’s
revenue commitment
may need to increase to
support the service and
capital return on
investment calculation
may become less
favourable.   
Potential for capacity
issues to run services, if
drivers are not
recruited in sufficient
numbers, and maintain
vehicles or the cost
increases as the work
needs to be carried out
externally.
Mitigation 
Early performance has
been strong and the
project is being proactive
in monitoring
performance data. Project
in-life reviews will take a
detailed look at data,
providing an opportunity
to review the service
model or future vision to
ensure it remains aligned
with capital and revenue
budget allocations. 
Continuous advertising of
positions, analysing data
from different stages of
the process to better
understand and mitigate
challenges faced. The
Team will also work to
minimise staff turnover.
Risk 
Actual performance
varies negatively from
assumptions built into
the full business case
(passenger numbers,
fare income etc).) 
Recruitment of staff
(drivers and vehicle
technicians) could
prevent or limit service
expansion plans.
Vehicle & Charge Unit Procurement
m.connect pilot of weekend services
Q1 24/25
Q1 24/25
Page 27

Page 28

Focus on…efficiency through analysis 
One of the major benefits of the new booking and management system supporting
m.connect, is access to a range of reporting tools that inform service optimisation
recommendations. The recommendations aim to improve service efficiency by
monitoring: 
1. Who travels and when (known as ridership).
2. The current demand profile by hour of the day (The balance of supply and
demand), Inc passenger per vehicle hour metrics (PpVH).
3. Ride sharing and vehicle utilisation. 
4. Trip requests by location, success rates and area specific influencers affecting
booking success, such as service zone restrictions, vehicle allocation within
area and service / driver break periods. 
Optimisation sessions are then conducted with the operations team to discuss
improvements in service delivery, but also highlight potential deteriorations in
other service metrics. These sessions occur every 3 months, allowing suitable
monitoring of changes to evidence their impact on the operation.  To date, these
sessions have improved ride sharing on the service from 42% to 65%, generating
an additional 23% seating capacity to accommodate more journeys.   
12
Page 28

Page 29

13
By way of insight, data from Forres exhibits high demand and has shown
considerable unmet demand. In order to meet this demand, recommendations
included: 
1. Modification of vehicle availability, i.e. extending Vehicle 2’s operating hours to
match/be similar to Vehicle 1. Unaccepted rides are mainly falling in the period
with only 1 vehicle operating.
2. Adding an additional vehicle would be beneficial in Forres, improving access to
the service. 
Using the evidence that is being gathered, the team are looking to enhance the
service offering further, with key areas of focus including: 
1. Private service functions:  The ability to add a bespoke route within the
operation to accommodate specific needs including education, health & social
care, sports groups, after school clubs.
2. Group booking function:  Enabling social groups to request services that
involve one request for a trip to a common destination but with multiple
collections and drop offs.
3. Integrated ticketing:  Fares validated on both on-demand and timetable
services. 
Matched Bookings
within requested time
window 
Cancelled Bookings by
customer 
Rejected booking by
customer (alternative
offered if initial
booking cant be
matched) 
Rejected booking by
service (demand
exceeding capacity)
Page 29

Page 30

Project summary 
A key characteristic of Moray is that it has over 3,000 small and medium sized
enterprises. This represents a considerable growth potential if these businesses
can be helped to scale-up. Supporting the upskilling and growth of these
businesses, the Business Enterprise Hub (BE Hub) will be a flexible space for
business innovation that is accessible to businesses and students alike, providing
an inspirational environment that encourages entrepreneurial thinking. Funding
for the facility will be provided by the Scottish Government (£3.3m) and Highlands
and Islands Enterprise (£1m), with the Scottish Government also provided £2m in
revenue to support service delivery.     
It will be a productive environment where learning spaces and real work
environments coincide, where flexibility of usage allows students, lecturers,
researchers, and practitioners to share the same space, and where business
support functions can be located with teaching and research skills to develop and
support Moray’s future entrepreneurs and their workforce.  
There are synergies between the BE Hub and other Growth Deal projects including
Moray Aerospace, Advanced Technology, and Innovation Campus (MAATIC) and the
Manufacturing Innovation Centre for Moray (MICM). Collaboration is ongoing to
understand the target audience for each facility and any potential for overlap to
ensure they’re effectively managed.   
14
Value £6.3m 
(£4.3m capital, 
£2m revenue) 
Lead Body
University of
Highlands and
Islands, Moray
College
3.2.2 Business Enterprise (BE) Hub
Current status
The full business case has been
developed and final clearances to enter
delivery will be sought once the recently
identified revenue shortfall has been
addressed 
Project vision 
Provision of education, research, and
business support functions to support
new business start-ups, whilst helping to
upscale existing micro businesses.
Business Enterprise Hub
design conceptPage 30

Page 31

15
Headline achievements 
RIBA stage 2 continued through Spring 2023, technical design elements of RIBA
stage 3 were included such as electricity and Wi-Fi cabling, plumbing etc. RIBA
stage 3 officially launched in November and is ongoing into January/ February
2024.
MAATIC, MICM and the BE Hub have developed a clear synergies document that
will be shared in the appendices of each FBC.
The Full Business Case (FBC) was developed throughout the year and has been
approved by the MGD Programme Board and the Moray Council.  Final 
clearances from the Governments and the UHI Board will be progressed once
the recently identified revenue shortfall has been resolved.  
Briefing and consultation sessions have been held with Moray Councillors, UHI
Moray staff, Moray Business Assembly, all positively received with clear demand.
The BE hub forms part of the South Street regeneration project, designs have
been exhibited at a public engagement session on 16 December 23 which
attracted over 600 visitors.
Memorandum of Understanding signed with Moray Council in December. 
Key milestones 
To progress the aims of the project, the following key milestones are identified for
2024.  These include milestones for the construction of the facility as well as the
Hub’s service offering. 
Full Business Case approved
Initial site survey/ exploration
Q1 24/25
Q4 23/24
RIBA Stage 3+ Design CompleteQ4 23/24
RIBA Stage 3 Design Cost Plan Q4 23/24
Planning ApplicationQ4 23/24
RIBA Stage 3 + Tendered Cost Q4 23/24
BE hub brand development to startQ4 23/24
RIBA Stage 4 Design CommencesQ4 23/24
Accredited course proposals/research and innovation
programme further developed
Throughout
2024, but
concluding in
Q3 24/25
Page 31

Page 32

In the expectation that FBC and planning permission approval stages proceed as
planned, construction will start in October 2024 and last for approximately 18
months. The Hub “working” model is under development to enable a smooth
transition upon building opening/launch with plans in 2024 to develop the BE hub
brand. In the background regular project board and stakeholder meetings are
ongoing to support the development of the Hub function. 
Risks and issues that require management by the project
team during 2024
16
Effects 
Work to rescope the
facility has already
taken place to ensure it
is delivered within the
budget allocation.   
Further work required
before the FBC can
continue it’s assurance
journey. 
Could result in delays to
construction activity or
the need to revise the
vision for the site, both
of which could affect
time, quality, and cost
project parameters.
Mitigation 
Cost mitigation through
design specification and
realisation of efficiencies
due to co-location with a
Housing Mix Delivery site. 
The revenue funding
model is being reviewed
with a view to lowering
the amount required
without impacting the
service or quality. 
Alternative revenue
solutions are also being
explored. 
Detailed site survey work
to be progressed as soon
as possible. 
Contingency integrated
into the budget to offset
any potential issues
identified.
Risk/Issue 
Escalation of build costs 
Revenue shortfall
identified 
Potential site issues e.g.,
ground works and
protection / integration
of existing heritage (as
yet unknown)
Planning ApprovalQ1 24/25
RIBA Stage 4 Design Complete Q1 24/25
RIBA Stage 4 Costs Q2 24/25
Construction commencesQ3 24/25
Page 32

Page 33

17
Area of focus….emerging RIBA stage 2 design vision for the
facility 
RIBA Stage 2 was the focus for the first part of the year, feeding into the
development of the FBC. Monthly meetings working through design versions were
held between UHI Moray, Oberlanders (architects), Robertsons, and Moray Council
(design images included below). 
The size of building from the original plan has been reduced by one-third to fit the
present value of the fixed capital funding allocated, design was critical to ensure
the maximisation of space available. Reducing the size does not disadvantage the
project, with the change accommodated by adjusting the need from full co-location
of public agencies to the hybrid working model now represented in the project.
Through developing the designs for RIBA stage 2 costs estimates were prepared to
demonstrate the financial sustainability of the BE hub project.   
The location of the BE hub will be on South Street in Elgin and will form part of the
South Street regeneration project. Over three floors, the hub will be where the
Junners Toy Shop previously was. Having a conservationist architect within the
team has ensured the building will incorporate some of the original features, such
as the scalloped top, as shown in the image below of the front exterior. The glass
frontage is important to ensure the building becomes a hub in it’s true sense,
welcoming and apparent from the exterior. 
The hub will have a high profile in the town centre as it’s sited near the main UHI
Moray campus and the city centre with an aim to make engagement accessible.
The hub will provide an inspirational environment, externally and internally and
one that really encourages entrepreneurial thinking. 
The BE hub will form part of a multi-building site shared with the MGD Housing
Mix project. The image above reflects the proposed back exterior to the BE hub
including the public realm space, shared with the Housing Mix project, and
developed by Moray Council. The back exterior of the hub, also depicting a glass
frontage, with the aim again to make engagement activity clearly visible and
encouraging. 
Business Enterprise Hub design conceptPage 33

Page 34

18
Value £32.3m
(£31.6m capital,
£700k  revenue) 
Lead Body
The Moray Council
3.2.3 Cultural Quarter
Current status
Working to submit project Full Business
Case to the MGD Board in late Q4 23/24
with a view to entering delivery by Q2
24/25 
Project vision 
Investment in key local assets, including
the refurbishment of Grant Lodge, the
Town Hall, and investment in the region’s
tourism infrastructure designed to
leverage in private sector investment in a
new hotel. 
Interior of Grant LodgePage 34

Page 35

Project summary 
The Cultural Quarter project is working to advance the development of
inspirational, accessible, public facing cultural attractions in the centre of Elgin.
Significant investment is in place from four partners: 
Scottish Government £12.7m
UK Government £3.5m
Moray Council £3.9m
Highlands and Islands Enterprise £2m 
Funding will be used to redevelop two important B listed historic buildings in Elgin:
Elgin Town Hall (Phase One) and Grant Lodge (Phase Two). Combined, these
phases of activity will provide an enhanced cultural offering which increases city
centre activities day and night, and highlights the region as an inspirational
destination of choice. 
Each element will be linked together by improved public spaces and physical
connections, creating a vibrant space in the heart of Elgin which supports inclusive
economic growth and cultural expansion within the city and wider region.
Collectively they’ll help to attract and retain talent whilst increasing tourism region
wide. Working with key stakeholders throughout Moray, these vibrant new spaces
will act as a springboard for cultural place-based regeneration, providing
opportunities for local people and visitors alike whilst
supporting the creative, heritage and tourism
sectors in Moray to collaborate, thrive and
grow. 
The creation of modern fit for
purpose venues and a visible,
aspirational cultural centre in
Elgin will encourage private
sector investment in a new
hotel at a complementary
site (Phase Three),
meeting a longstanding
requirement for
additional, quality,
hotel accommodation
in Moray. 
19
Doors Open Day at Grant LodgePage 35

Page 36

Headline achievements 
Cultural Quarter development workshops and Moray culture & heritage
mapping study complete (working with 60+ regional and sectoral partners).
Specialist economic and cultural consultants EKOS and Creative Services
Scotland appointed to update Business Plans for Elgin Town Hall and Grant
Lodge, review options for a CQ governance model / operating organisation and
update the project impact assessment.
Cultural Quarter phasing and delivery plan RIBA stage 2 report complete. This 
presented proposals for how external sites and spaces can be improved and
connected to lay the foundations for a successful Cultural Quarter with clear
links to the High Street.
Full fabric condition survey completed for Grant Lodge, including
recommendations for conservation standard safeguarding/enabling works and
costs.
LDN Architects appointed as lead consultant in multi-disciplinary design team to
progress the plans for a transformed Elgin Town Hall. 
Key milestones 
20
Updated business plans, operational models, and
Impact assessment for CQ venues
Capital and transitional programme for Elgin Town Hall
confirmed
Q4 23/24
Q4 23/24
Full Business Case submitted to MGD Programme
Board
Grant Lodge design team and cost consultants
appointed.
Q4 23/24
Q4 23/24
Elgin Town Hall RIBA stage 2 complete
Elgin Town Hall works tendered, with updated annex
prepared for governance that adds to detail contained
within the FBC
Q4 23/24
Q3 24/25
Elgin Town Hall works complete
Grant Lodge works complete
Q4 26/27
TBC - 2027
Elgin Town Hall Works start on site
Grant Lodge works tendered, with updated annex
prepared for governance that adds to detail contained
within the FBC
Q2 25/26
Q3 25/26
Page 36

Page 37

21
Risks and issues that require management by the project
team during 2024 
Effects 
Impact on
deliverability of the
project which could
in turn affect
outcomes and
benefits. 
Lack of resources
leads to project
delays with
operational/busines
s impacts, inability
to appoint the
correct professional
services leads to
capital programme
delays and cost
increases which
may affect ability to
deliver full vision. 
Any impact to the
sustainability of the
charity could
negatively affect
the project’s ability
to deliver full
project outcome
and benefits.
Mitigation 
Careful planning to ensure
designs deliver objectives
Pursue all additional funding
routes
Appoint client-side cost
consultant and construction
support through HUB North
Engage with contractors early,
regular review 
Planning to ensure
experienced input for each
project strand understood
Early and continual
engagement with key relevant
sectors
Attractive and well-developed
briefs which highlight profile
and benefits of the CQ
Engagement with Hub North
Continual re-assessment of
programme risk and
interdependencies across
internal and external teams
Share info and learn from
other MGD projects. 
Sub-group of the Cultural
Quarter Project Board
established to oversee
transitional arrangements
Capital programme to be
appraised against Elgin Town
Hall programme to limit the
loss of significant income
generation opportunities
Transition management costs
integrated into Cultural
Quarter project budgets
Risk 
Inflation in
construction costs
means buildings
exceed budget
allocation. 
The project does
not have sufficient
resources to
manage both the
complex capital
redevelopment
programme and
associated business
and relationship
development
required. 
The project is
working to ensure
Elgin Town Hall for
the Community has
options that enable
it to operate whilst
redevelopment
work takes place,
but any delays
could impact their
community and
contractual
relationships.
Page 37

Page 38

Focus on….LDN Architects appointed to lead transformation
of Elgin Town Hall 
During 2023 the project team worked closely with Elgin Town Hall for the
Community and a wide range of other key stakeholders, from Elgin Community
Council to the National Theatre of Scotland, to develop a detailed brief which
outlined current building issues and future aspirations clearly. 
Following a two-stage public procurement process, which generated 23 notes of
interest, LDN impressed the panel with their clear, thoughtful approach, and
creative concept designs to come out top from a selection of prestigious practices
from across the UK. LDN Architects and a number of consultants within their
design team have bases in the north of Scotland including employing new local
members of staff specifically to work on this project, assisting the Cultural Quarter
in delivering our commitment to Community Wealth Building. 
Work is now underway to progress RIBA Stage 2 concept designs in line with the
first phased submission of the Cultural Quarter Full Business Case which is due
late Q4 23/24 / early Q1 24/25. The proposed redevelopment will overcome
limitations of the current building to create a welcoming 21st century performance
and community space which builds on the success of the existing venue. Redesign
of the building will improve circulation, acoustic separation, environmental
performance and add a new multi-use studio space to enhance and widen
programming. Updating the already popular Elgin Town Hall will enable the venue
and Elgin to take its rightful place as the third major cultural centre in a row of
important northern capitals. 
22
Elgin Town Hall aerial view proposal
Picture courtesy of LDN Architects
Page 38

Page 39

Project summary 
The Rural Centre for Excellence (RCE) is a complex programme of Research &
Development based assets (DSE and R&D infrastructure) in Moray. It links to
developing a portfolio of five Living Labs as a vehicle for exploring novel concepts,
iterating solutions and evaluating innovations to complex health and care
challenges. Since the programme started in late 2021, a number of important key
achievements have been realised - particularly over the last 18 months where the
RCE innovation team have been mobilised.  
At the end of 2023 the project submitted a change request that was approved by
the MGD Board seeking to extend the project by a year to May 2026.  This is in light
of the Rural Centre for Excellence securing a longer term funding agreement from
the Scottish Government.  The additional time will be used to create a more
holistic, connected set of healthcare applications. 
The £5m of capital needed for this project is being provided by the UK
Government.    
One key lesson learned by RCE is that the Moray region and partners were not fully
primed to support innovation and digital from the outset. Intensive work is now
ongoing with Health and Social Care Moray (H&SCM) and the wider community to
support them in developing capacity and aligning with their strategic priorities.
There is a notable commitment from H&SCM, who has recently included the Living
Lab themes in their long-term strategic planning. In common with social care
capacity across the UK, pressures in this sector does constrain ability to engage
and deliver at pace. The digital health initiative funded by the Moray Growth Deal is
an opportune investment to support R&D and sector-wide innovation (which is
likely to increase productivity).  
23
Value
£5m capital 
Lead Body
Rural Centre of
Excellence (RCE) for
Digital Health and
Care Innovation
3.2.4 Digital Health
Current status
Achieved approval for the project Full
Business Case in Q3 21/22 and is now in
delivery 
Project vision 
Creation of an anchored demonstration
and simulation environment (DSE) and
Living Lab testbeds for the Moray region.
Page 39

Page 40

Strategic Landscape  
The health and care sector continues to face challenges as increasing demand for
services exceeds the ability of services to accommodate this. That said, the
innovation landscape in the UK is experiencing significant momentum with various
initiatives underway to harness technology, data and collaborative efforts to
enhance healthcare delivery. The main trends to note are:  
1. Increasing technology integration to bring digital health solutions into
healthcare systems and provide more personalised care.  
2. Data utilisation efforts to leverage vast amounts of data to explore ways to
identify trends, predict changes, personalise care and optimise resource
allocation via data-driven approaches. 
3. Focus on prevention and well-being: There is a growing shift toward
preventative care and holistic well-being. Initiatives aimed at promoting healthy
lifestyles, mental health support, and early intervention to prevent chronic
conditions are gaining traction.  
The landscape in the health and care sector is ever evolving. Advancements in
technology, changes in policy, and societal needs continue to shape the direction
of innovation in the UK, against an uncertain funding backdrop.  
Headline achievements 
Living Labs
During 2024,Living Lab 1 (Supported Self-Management) will progress through it’s
development phase and into testing.   
Living Lab 3 (Care in Place) has progressed significantly over the last year, with
two key assets (both fundamental to the full RCE infrastructure) developed, and
the user testing phase nearing completion. The first asset to emerge for this
living lab is the Community Connections @Moray platform and is the spotlight
focus in this year’s report. The second asset is the creation of a Personal Data
Store (PDS).  The scope of the work is around integrated care, and looking at
equipping citizens with a Personal Data Store that allows them to keep a copy of
their data online and take it with them as they move between different health,
care, third sector and independent organisations.  It will also potentially contain
information from health professionals, making it easier for them to understand
the healthcare journey of patients. 
Living Lab 2 (Long Term Condition Co-Management) NHS pathway was activated
in 2023, as definition and initiation workshops highlighted a need to find digital
solutions to support access deprivation and the sustainability of a clinical
service to support those with a type 2 diabetes diagnosis. 
Living Lab 2 (Long Term Condition Co-Management) community pathway was
also activated and workshops took place with the Occupational Therapy (OT)
service to develop a call to industry to develop digital solutions to improve
access to the service and reduce waiting times.
Significant re-scoping for Living Lab 4 (Smart Housing/Smart Communities) and
Living Lab 5 (Mental Wellbeing) with realignment of the site from Dallas Dhu to
Leanchoil Trust in partnership with the Housing Mix project.
24
Page 40

Page 41

Developing key enabling R&D digital infrastructure to allow the work to take
place.
Progressing information governance and EQIA assessments. 
Skills
A skills grant was awarded to UHI Moray to develop an online learning module
"Digital Essentials for Carers” comprising four short units – learners receive a
digital ‘badge’ on completion of each unit and a digital certificate to confirm
completion of the overall module, which can support the Continuous
Professional Development (CPD) of paid staff.
SkillsFest event took place at UHI Moray in November 2023 - the key focus of
this R&D skills-related gathering was to share the RCE skills work and outline
how innovation assets and strengthening the skills and education pathway can
enable the region to become more attractive, increasing the skills across the
system.
Curating skills and activities that support capability and capacity building for the
ecosystem that will need to understand how to innovate and use digital tools
(e.g., Micro credentials and upskilling out-reach activities). 
Procurement
Dynamic Purchasing System (DPS) was activated as the innovative procurement
vehicle for RCE calls to industry. 
Comms and Engagement
The Demonstration and Simulation Environment (DSE) was set up and launched
early in 2023. A launch event was held in April to mark the occasion, with a
closed session in the morning with invited delegates and an open session in the
afternoon for the general public to experience the DSE.
Procurement of a collaboration platform to support the Digital Innovation Hub
and Citizen Panel activities for the RCE project.
Developing a network of stakeholders and a strong project board including sub
working groups aligned to thematic areas (e.g. skills, sustainability).
Developing international opportunities and hosting international visitors at the
DSE in Moray.
Reaching over 300 participants locally, over 60 registered for the RCE citizen panel. 
Evaluation
Strategic Evaluation Partner contract was successfully appointed to University of
Highlands and Islands with the draft evaluation framework being developed. 
Sustainability and inward investment
RCE Sustainability working group was set up and an outline sustainability plan
has been developed by the Commercial Innovation Lead.
Supported bid-development in the region including a successful community
research network funded through UKRI and further digital inclusion funding
from SCVO. 
Strategic
Internal audit completed in December 2023 with positive feedback received. 
25
Page 41

Page 42

Key milestones 
Risks and issues that require management by the project
team during 2024 
26
Effects 
Has the potential to
cause slower
uptake in support
for the project
which may cause
delays in reaching
milestones.
Mitigation 
Change request approved
during Q4 23/24 that extends
project into 2026. Provides
more time for the project to
develop effective
relationships with all partners
to secure the necessary
support to complete
deliverables.
Risk 
Ability for key local
and regional
stakeholders to
support project
innovation activity.
Living Lab 1 and 3 to move to real world evidence stage
Development activity for  living lab 2 to commence for
community supported diabetes pathway
Q1 24/25
Q1 24/25
Invitation to tender launched via the DPS for
Occupational Therapy Service support (living lab 2)
Living labs 4 and 5 to commence
Q1 24/25
Q1 24/25
Page 42

Page 43

27
Focus on….Community Connections app development  under
living lab 3 (Care in Place) 
Throughout the RCE project and broader DHI engagement, it has been repeatedly
highlighted by citizens and professionals that there is a need for better access to
information and services with a reduced need for the user to re-tell their story. The
Care in Place project team with broad stakeholder representation, have iteratively
codesigned the ‘Community Connections @Moray’ (CCM) platform to offer this in a
one stop shop. 
With an initial focus on unpaid carer need, the CCM platform provides information
for both the cared for, and the unpaid carer, through a holistic, verified and
filterable directory of community, third sector, health and care services and
resources. The primary aim is to support self-management and enable access to
the right information at the right time, with sign posting and soft referral where
appropriate. By registering with a name and email address, users will also have
access to an ‘about me’ section where they can record their own journey and
personally significant information for automated re-use in referral to a selection of
community services. 
This platform has been developed throughout 2023 and will be tested in the Forres
and Lossiemouth areas in 2024, along with the Personal Data Store. As a core
infrastructure asset for the RCE, this platform will continue to grow and develop
along with other living lab activity. 
Page 43

Page 44

28
Value £6.4m
(£4.8m capital,
£1.575m revenue) 
Lead Body
The Moray Council
3.2.5   Early Years Science, Technology,           
Engineering and Mathematics           
(STEM)
Current status
Working to submit project Full Business
Case to the MGD Board Q4 23/24 FY, with
a view to securing clearance to enter
delivery by June 2024. 
Project vision 
To raise the aspirations of children age 3-8
in Science, Technology, Engineering and
Maths (STEM)
Page 44

Page 45

Project summary 
The Early Years STEM project will see investment of £4.8 million of capital funding
from both the Scottish Government and Moray Council. The Scottish Government
will commit up to £3.5m and Moray Council £1.3m. Moray Council will meet
revenue requirements (£1.575m) that includes operational costs and dedicated
staffing provision for the duration of the project. 
The nature of work is changing, and where Moray has historically relied upon
traditional manufacturing and retail business, in the future there will be more high
level, technology based occupations. Creating more appeal for STEM related jobs is
important to facilitate the evolution of skills required by the future jobs market,
and to ensure Moray is resilient in the future.   
Early Years STEM aims to encourage young people to enter into a STEM related
career when they leave education and focuses on STEM engagement with children
in their early stages of learning (age 3-8). The project develops a STEM learning
ecosystem in the Moray area, through the creation of specialist learning
environments and experiences, access to training and resources, and the creation
of a STEM learning network involving key delivery partners, upskilled staff,
volunteers from industry and the wider community. 
This innovative development will build on existing educational practices and
initiatives, and will create the necessary infrastructure to support a STEM skills
pathway from early years through to broad general education and beyond. 
The project will invest in state of the art facilities in community settings throughout
Moray, each offering a unique experience that can be delivered flexibly across the
region, including mobile and outreach offerings. These Hubs will aim to inspire and
enhance the STEM learning experience of children and staff through age
appropriate, curriculum aligned and industry related STEM experiences, and will
offer accessibility to parents, employers and the wider community, thereby
allowing inter-generational learning to take place. 
The aspiration of this strategy is to close the equity gaps in participation and
attainment in STEM, ultimately leading to more young people choosing STEM
occupations at a later stage in their lives.  ensure they’re effectively managed.   
29
Page 45

Page 46

Headline achievements 
Significant progress has been made during 2023 with the development of
infrastructure, operational plans and partnership arrangements.   
Sites have been identified for all four STEM centres, with particular focus on
planning for the first of these located within Elgin Library.  A multi-disciplinary
design team led by Moray Council has been appointed and early architectural
proposals developed for the Elgin facility.  Planning will continue into 2024 as
proposals are developed for the satellites sites in Forres and Buckie, as well as a
unique outdoor environmental education centre in a central location. 
These facilities will be complemented by a robust outreach provision that includes
a mobile offer and STEM Lending Resource, delivered in collaboration with UHI
Moray’s STEM Outreach team and with support from key STEM providers across
Moray. UHI Moray’s Lend a Lab initiative is now being offered to Moray schools and
2024 will see partners adopt an iterative and collaborative approach to further
develop this model and extend the reach of STEM engagements from early years
through to primary education. 
Proposals are being finalised for inclusion into the Early Years STEM Full Business
Case which is on track for submission to the Moray Growth Deal Programme Board
early in 2024. Approval of the Full Business Case will secure funding to commence
a capital development programme and official launch of the first STEM centre
location in August 2025. 
30
Page 46

Page 47

31
Key milestones 
As we head towards completion of the Full Business Case, 2024 will see significant
progress on a number of elements: 
Full Business Case submission
Staff recruitment and curriculum development
Official launch of STEM outreach offer
Design phase RIBA 3-4 incorporating exhibition and
interpretation
Construction contractor appointed
Vehicle and equipment purchase 
Construction and fit out works complete
Official launch of Elgin STEM Centre and mobile offer
Development of proposals and partner agreements
Creation of development plans, budgets and
architectural drawings. 
Public consultation
Site acquisition, legal processes and planning
permissions
Delivery phase of building works, infrastructure
development
Official launch of Outdoor Environmental Education
Centre
Official Launch of Forres STEM Centre
Official Launch of Buckie STEM Centre
Q1 24/25
Q1 24/25
Q2 24/25
Q2 24/25 
Q3 24/25
Q4 24/25
Q1 25/26
Q2 25/26
Q1 24/25
Q4 24/25 
Q4 24/25
Q2 25/26 
Up to 
Q1 28/29
Q2 26/27 
Q2 27/28
Q2 28/29
Phase 1
Phase 2
Page 47

Page 48

Risks and issues that require management by the project
team during 2024 
32
Effects 
Potential to
affect the scale
and ambition
of the project
that could
affect
outcomes and
benefits. 
Inability to
realise
outreach
activities. 
Improvements
in STEM
attainment
levels not
realised.
Mitigation 
Re-develop existing space to reduce
costs. 
Experienced architectural team to
provide budgets and sound project
management.
A phased approach to implementation
of facilities that will identify rising costs,
capture lessons learned and make early
interventions.
Close liaison between teams.
Adopt value engineering approach. 
Delivery model revised during 2023 to
fit the capital and revenue budget
available.  
Build in elements to the project that will
attract future funding opportunities to
support core staffing and continued
refreshment of the project.
Grow partnerships with other STEM
providers. 
Develop a delivery network of
volunteers and industry ambassadors
to ensure the longevity of the project. 
Consultations with education staff,
young people and the community
throughout the design process to
understand need.
Engagement with other STEM
providers, partnering and providing a
web of joined up inspiring and age
appropriate experiences
Identify barriers to participation and
seek to remove where possible. 
Flexible and dynamic approach to
curriculum development and project
delivery.
Implement CPD training to benefit all
schools through the Associated School
Group (ASG) network 
Risk 
Rising
construction
costs and scope
change. 
Insufficient
operation
planning and
budgets. 
No change in
community
attitudes or
regular repeat
visitations to
STEM centre
infrastructure.
Page 48

Page 49

33
Focus on….the project’s first hub in Elgin Library 
The first phase of the MGD Early Years STEM Project will see development of an
Early Years STEM Discovery Centre and Community Learning Hub, hosted within
Elgin Library at Cooper Park. The space will serve as a focal point for early years
STEM education, delivering interactive learning experiences to Early Learning and
Childcare settings, primary schools, and home educators across the region. 
The partnership with Elgin Library delivers  mutual learning objectives while
sharing resources, through co-location, provision of specialist equipment and
support from staff.   
2023 has seen significant progress planning for this facility.Moray Council’s
Architect led Design Team have developed proposals to RIBA stage 2 which sees
the former drill hall area transformed into an early years interactive learning
resource. An exhibition and interpretation design partner is being appointed in
January 2024 to fit out the space incorporating bespoke learning equipment and
educational programmes.  Stakeholder consultation is being planned for 2024
where users of the space will contribute to design plans and support the creation
of a state-of-the-art facility that will transform STEM learning in Moray.   
The BE hub will form part of a multi-building site shared with the MGD Housing
Mix project. The image above reflects the proposed back exterior to the BE hub
including the public realm space, shared with the Housing Mix project, and
developed by Moray Council. The back exterior of the hub, also depicting a glass
frontage, with the aim again to make engagement activity clearly visible and
encouraging. 
Early Years STEM Discovery Centre and
Community Learning Hubdesign concept Page 49

Page 50

34
Value
£7.5m capital 
Lead Body
The Moray Council
3.2.6 Housing Mix Delivery
Current status
The full business case was approved
during Q4 23/24 and the project has
entered delivery. 
Project vision 
Stimulating housing development in town
centres, unlock constrained sites and
promote the integration of pilot exemplar
sustainable design and construction
techniques.
Project summary 
The Housing Mix Delivery is a £7.5m project with a commitment of £5m from the
Scottish Government and £2.5m from Moray Council. The project supports the
delivery of up to 360 affordable houses and plots; 150 short-term construction
jobs annually; stimulates the private housebuilding sector to deliver up to 500
market houses; supports town centre regeneration of brownfield sites; and
provision of housing in rural towns and villages. 
Headline achievements 
Strategic progress: Full Business Case approved by Moray Growth Deal
Programme Board on 29 September 2023. 
South Street, Elgin: Legal agreements signed between partners, site acquisition
commenced in November 2023. Design completed to RIBA Stage 2, and RIBA
Stage 3 work started in November 2023. 
Dallas Dhu, Forres: Design team was appointed in March 2023. Proposal of
Application Notice (PAN) submitted on 16 June 2023 and revised PAN was
submitted on 21 November 2023 to include student accommodation. 
Hillside Farm, Dufftown: Design team appointed in June 2023. Community
Engagement Events held on 9 August 2023 and 6 December 2023. 
Speyview, Aberlour: Funding package agreed by the Scottish Government More
Homes Division to provide additional funding given the Growth Deal investment. 
Page 50

Page 51

35
Key milestones 
South Street, Elgin:  Submission for planning consentQ4 23/24
Dallas Dhu, Forres:  Submission for planning consent
Hillside Farm, Dufftown:  Draft Masterplan to be
approved by Council’s Planning and Regulatory
Services Committee
Q4 23/24
Q4 23/24
Speyview, Aberlour:  Funding Agreement to be signed
and Growth Deal investment of £700,000 to be spent
Hillside Farm, Dufftown:  Final Masterplan to be
approved by Council’s Planning and Regulatory
Services Committee
Q1 24/25
August 2024
Aerial view of South Street
development plans design concept
Page 51

Page 52

Risks and issues that require management by the project
team during 2024 
36
Effects 
The project is able to invest
in fewer sites throughout
Moray as the budget was
fixed in 2021 and will not
be adjusted for inflation. 
Whilst this is a risk the
project is managing, it is
still projected that the
expected benefits will be
realised.   
Project scope may need to
be changed or the delivery
timescales elongated. 
Potential for other activity
to impact the ability for
HMD to create the right
environment for success
with stakeholders and
realise all of the benefits
sought.
Mitigation 
A cost consultant has been
engaged to control the
investment costs for each
site. 
Funding from additional
sources will be sought. 
The Council is actively
exploring external funding
options, such as UK Shared
Prosperity Fund, Just
Transition and UK
Government Long Term Plan
for Towns. 
Good working relationships
have been established
between Growth Deal
Project Managers.  This is
evidenced through
constructive collaboration
with the Business Enterprise
Hub on South Street
redevelopment. 
Risk 
Inflation and
construction costs
continue to rise. 
Inability to attract
external sources
of funding to
support the
delivery of the
project. 
Activity being
progressed by
other Growth Deal
projects or
economic
development
activity in Moray
has a negative
impact on HMD.
Page 52

Page 53

37
Focus on….South Street (Elgin) regeneration project 
This is a partnership project between Moray Council, Moray College UHI and
Robertson Property Ltd; and forms part of two Moray Growth Deal projects:
Housing Mix Delivery and Business Enterprise Hub. The overall site comprises five
separate ownerships: 
M&Co, 51 South Street (long vacant)
Elgin Furniture & Carpet Store, 53-55 South Street (operating business)
Junners, 57-61 South Street (long vacant)
Jailhouse, 130 High Street (derelict)
Newmarket Bar, 130 High Street (derelict) 
This regeneration project will deliver the Business Enterprise Hub, 38 one and two
bed flats and opportunities for 2-3 small retail units. 
During 2023 design was progressed to RIBA stage 2 and in November 2023 entered
into RIBA Stage 3. Legal agreements were signed by all parties and development
agreements have been drafted late 2023. Site assembly started in late 2023 and
public engagement event was held on 16 December 2023. A detailed planning
application is anticipated to be submitted to the Council during Q4 23/24. 
South Street development plans
design concept
Page 53

Page 54

Project summary
This project aims to deliver a once-in-a-generation combination of the Moray
Growth Deal, strategic aerospace developments and a partnership with Boeing to
provide a genuinely transformational opportunity for the region and its people. 
Funding for the facility will be provided by the UK Government (£21m) and
Highlands and Islands Enterprise (£3m).   
Having received an updated and detailed proposal from Boeing in summer 2023,
regarding how they will support the MAATIC facility, the project team is working to
develop a Full Business Case that focuses on five streams of activity: 
1) Boeing /Civil Aviation Authority (CAA) / Air Services Training (AST - Existing skills
and training vehicle of UHI Perth)  condensed part 66 and type approved
training (aerospace and aviation)
2) Immersive training centre for safety critical systems (immersive technologies
and synthetic training)
3) Delivery of a suite of integrated programmes of education covering aerospace,
aviation, immersive technologies, advanced manufacturing and innovation
4) Centre for research in aerospace and sustainable fuels (aviation, aerospace and
innovation)
5) Innovation and development space 
The MAATIC building itself will house commercial and academic leading-edge
research on these emerging technologies, will be a training facility to support the
skills required to underpin and deliver these technologies. It will have a communal
space for the promotion of STEM developments and opportunities to the
community and to the next generation of technologists. 
Whilst the Business Enterprise Hub, MICM and MAATIC FBCs aim to solve different
challenges regarding business growth and skills, there are significant synergies and
work has taken place to ensure clarity on the scope of each, areas for potential
overlap and how these can be successfully managed.   
38
Value
£24.4m capital 
Lead Body
UHI (University of
Highlands and
Islands)
3.2.7   Moray Aerospace, Advanced Technology                
and Innovation Campus (MAATIC)
Current status
Project under review in light of funding
challenges.   
Project vision 
A cutting edge commercial and
academically supported training and
research centre for excellence that will
provide advanced skills for the region’s
industries.
Page 54

Page 55

39
Headline achievements 
During 2023 the project developed a revised vision for the project that saw a move
to focusing on leading edge digital skills for the aerospace industry that is
supported by Boeing, the application of digital learning to other safety critical
environments and R&D opportunities.  With no need for the facility to be located
near to a runway, other sites in Moray have been appraised. 
A key project USP is a progressive, mutually beneficial relationship with Boeing.
Following work to refine the vision for the facility and how Boeing could support
this, both parties advanced the development of a formal partnership agreement. 
From a resourcing perspective, the pace of progress during 2023 has been affected
by staff changes and availability.  Steps were taken at the end of 2023 to mitigate
this in the future with responsibility for the project moving from UHI-Moray to UHI-
Executive Office. 
Key milestones 
UHI to conclude internal review of the project FBC
Subject to the above,the following steps will be taken
to advance the project:   
UHI and Boeing to sign a partnership agreement 
Resubmission of MAATIC FBC to the MGD Board,
with a view to commencing the process to secure
Government and Moray Council approval 
Government clearance and Council approval to be
secured, enabling the project to enter delivery 
MAATIC project to enter delivery
Q4 23/24
Q4 23/24 
Q4 23/24 
Q2 24/25 
Q2 24/25
Page 55

Page 56

Risks and issues that require management by the project
team during 2024 
Focus on….creating a digital learning environment for
aerospace skills 
Throughout 2023 the project worked closely to redefine the vision for the facility in
light of the industry moving towards hybrid (virtual and physical) training for
aerospace skills. UHI sought to ensure that a multi-dimensional operating and
financial model was in place that would mean the continued viability of the
campus. 
Central to the new vision is the use of augmented, immersive teaching
environments for condensed part 66 training. The project will work with Boeing
and the Civil Aviation Authority in light of changing regulations to integrate virtual
ways of working into teaching.   
In creating these teaching environments, the project will look to the academic and
R&D opportunities within the facility to include both digital skills and apply the
learning environments to other safety critical environments.  
40
Effects 
Potential for delay
and rework. 
Alters the financial
model and
potentially the
viability of the
project as a whole. 
Affects the
delivery
timescales for the
project. 
Threatens
planned
redevelopment of
site and FBC
plans.
Mitigation 
Close collaboration with key
stakeholders. 
Robust planning during the
implementation phase and regular
reviews of data so the project and
Business As Usual teams can take
action as needed to realise targets
set. 
Close collaboration with key
stakeholders. 
Should the revised costs push
beyond the budget explore
refinements to reduce costs that
mean project objectives can still be
achieved. 
Risk 
Issue: The FBC in 
it’s current form
cannot be
progressed. 
Risk: Gaps
between actual
and projected
targets around
student numbers,
research and
innovation. 
Risk: Delay in site
acquisition. 
Risk:  Increase in
capital costs
render original
plan unaffordable.
Page 56

Page 57

41
Project summary 
The key driver for this project is to achieve a grassroots cultural shift in how Moray
businesses gain insight into the latest process and production efficiencies that are
available, and how they can use them for product and process innovation.   
The Manufacturing Innovation Centre for Moray (MICM) will act as a local focal
point for business to access best practice and identify how they can collaborate
with universities and other research institutes. They’ll be quickly supported to
access the relevant support from organisations such as Highlands and Islands
Enterprise (HIE), National Manufacturing Institute Scotland (NMIS), Scottish
Manufacturing Advisory Service (SMAS), Interface (the knowledge connection for
business), Business Gateway and other service providers to meet their needs. 
The project will receive both capital (£610k from the Scottish Government, £2.4m
from the UK Government and £2.5m from Highland and Islands Enterprise) and
revenue funding (£1.25m from Highlands and Islands Enterprise). 
MICM will provide services that are customised to the needs of rural
manufacturing business, it will also act as a vital access point for local businesses
to engage with the National Manufacturing Institute for Scotland and other
national innovation support services. 
The development of the FBC during 2023 has supported our view that, while much
has changed since the Moray Growth Deal was developed, the core need to
support a vital sector to improve and innovate has not and MICM’ s mission is
more relevant than it was in 2019. 
Value £7m
(£5.6m capital,
£1.36m revenue) 
Lead Body
Highlands and
Islands Enterprise
3.2.8   Manufacturing and Innovation Centre               
for Moray (MICM)
Current status
The full business case was approved
during Q4 23/24 and the project has
entered delivery. 
Project vision 
A focal point for businesses to learn best
practice and collaborate, stimulating the
creation of new and growth of existing
micro businesses throughout Moray.
Page 57

Page 58

42
Headline achievements 
Our focus during 2023 has been to develop the Full Business Case and to gain
approval for the project to progress. 
Key achievements include: 
Development and approval of change request covering the project’s location, no
longer co-locating with the MAATIC project, but refurbishing existing buildings
with some new build construction on the Forres Enterprise Park.
Whilst the MICM, MAATIC and Business Enterprise Hub projects all tackle
different audiences regarding skills and business development, work developed
the potential for overlap and synergies with each. 
Development of the project’s Full Business Case that was approved by the MGD
Board in September 2023.  
Engagement with the Government to enhance the FBC following comments
from Policy Advisors.  
Approval of the FBC by HIE Board. 
Key milestones 
Complete design
Planning approval
Feb 2024
March 2024
Commence construction
Key staff recruited
May 2024
Autumn 2024
Complete construction
Operational stand-up
Autumn 2024
Autumn 2024
Page 58

Page 59

43
Risks and issues that require management by the project
team during 2024 
Effects 
Compromises
what MICM can
deliver. 
Vision for MICM
diverges from
what the business
community would
like to see. 
Revenue shortfall
Mitigation 
Monitor. Contingency is built into
cost model. Construction starts
in2024. 
Consultation events with the Moray
Growth Deal, Business Assembly and
Chamber of Commerce, as well as a
broader business survey. Ensure
involvement with Project Board. 
Sensitivity analysis in FBC.
Develop alternative revenue
sources.
Risk 
Cost inflation
affects project
affordability. 
Lack of productive
engagement with
the business
community. 
Revenue
assumptions are
overoptimistic.
Page 59

Page 60

Focus on….how the project will support businesses to grow
and innovate 
The ambition for MICM is to create a grassroots cultural shift in efficiency and
innovation for Moray’s manufacturing businesses. HIE work with manufacturing
businesses across our region to support their development and we see a clear and
growing need for local support to access the best practice required to make the
leap to the next level. 
Some recent examples include: 
A manufacturer developing lighter components using composites is looking for
support in development of validation and testing of components from NMIS and
the national Lightweight Manufacturing Centre. This will require at least two
week’s travel to the central belt for key personnel who are currently in the
middle of a demanding scale-up project.  The company is currently weighing the
benefits of continuing with the project. With MICM in place they could access a
local venue for both equipment and project support reducing costs and
disruption and bringing the test equipment closer to their processes.   
A Caithness based engineering company has been affected by a shortage of
skilled labour. Having analysed their manufacturing processes, they believe that
automation of their production line might help. With support from HIE, the
company attended a demonstration event held in Thurso by the North
Lanarkshire SmartHub to explore the use of cobots (collaborative robots) to
improve their welding processes. During the event the company met with an
equipment vendor and have gone on to develop a project to install and evaluate
a small cobot at their Caithness site.  The potential prize for the company is an
expansion of working hours, reduced order fulfilment times and securing
further orders. This is a great example of the type of project that we want MICM
to work for Moray businesses – using a centralised hub to provide links and
opportunities for SMEs to access best practice in manufacturing and supporting
them to evaluate how it could benefit their business. 
44
Cobot
Page 60

Page 61

45
4 Forward look at activity planned for 2024 
4.1 Work to get all Growth Deal projects into delivery
The Moray Growth Deal entered 2023 with one project in delivery, Digital Health.
This was quickly joined by Bus Revolution that received clearance to enter delivery
in March 2023. 
Building on this, in the second half of 2023, three project FBCs were developed and
submitted for  formal review by the Scottish and UK Governments: 
Business Enterprise Hub
Housing Mix Delivery 
MICM 
These documents have been the subject of extensive consultation and received
approval from a number of different governance steps.   
By the end of Q4 23/24, four of the eight Growth Deal projects are in delivery
(Housing Mix Delivery and MICM joining Digital Health and Bus Revolution), with
the Business Enterprise Hub due to be the fifth once the philanthropic revenue is
confirmed. Of the three remaining projects: 
The Cultural Quarter and EY STEM projects are expected to submit their FBCs to
the MGD Board during Q4 23/24 and Q1 24/25.
An FBC has been drafted for MAATIC that is currently being reviewed.   
Project 
BE Hub 
Housing
Mix
Delivery 
MICM
Pre-
submission
workshop
with the
Governments 
21 Jun 2023 
3 Aug 2023 
3 Aug 2023
Project
Board
approval 
27 Jul 2023 
20 Sep 2023 
8 Sep 2023
First approval
to trigger
Government
review 
11 Aug 23 
29 Sep 23 
25 Aug 23
Second
review
following
Government
feedback 
12 Dec 23 
12 Dec 23 
12 Dec 23
Other
approvals 
26 Jul 23:
Moray
College
Board 
31 Oct 23:
HIE Board
Moray
Economic
Partnership 
14 Dec 23 
14 Dec 23 
14 Dec 23
Page 61

Page 62

4.2 PMO Milestones to be achieved
During the course of 2024, the Moray Growth Deal PMO is working to achieve a
number of key milestones: 
46
Work to understand planning implications
(resources, risks, opportunities) associated between
the Growth Deal, Levelling Up Fund and the Long
Term Plan for Towns fund. 
Deal annual conversation involving senior officers
from Moray Council and the Scottish and UK
Governments. 
Business Enterprise to enter delivery once revenue
budget confirmed. 
2024/25 grant offer letter to be agreed with the
Scottish Government, confirming the level of
funding to be provided during the financial year.   
Publication of the Deal’s 2023 annual report. 
Cultural Quarter and EY STEM project full business
cases to be approved and clearance secured to
enter delivery. 
Second tranche of in-life reviews to be scheduled.Q2s and 3
24/25
Q4 23/24
Q4 23/24
Q4 23/24 or 
Q1 24/25
Q1 24/25
Q1 24/25
Q2 24/25
Page 62

Page 63

47
4.3 Factors needing action or future activity could be impacted 
There are a number of ‘uncertainties’ that could have a positive or negative impact
on Growth Deal activity that are being managed at both a programme and project
level.  Key uncertainties include: 
Consideration needs to be given to how Growth Deal activity interacts with
projects funded through Levelling Up and the Long Term Plan for Towns Fund to
ensure that they complement each other, that there is no overlap and that there
are no inadvertent risks created as the work is commissioned.  
With the potential for construction projects associated with the Business
Enterprise Hub, Cultural Quarter and Housing Mix Delivery occurring at the
same time in Elgin, planning will need to take place with key stakeholders to
ensure any potential disruption for the public and businesses is minimised.
Cost inflation and the affordability of projects remains a potential risk. During
2023 significant work was undertaken by Project Managers to rework aspects of
construction plans an operational models to ensure they meet capital and
revenue projections. Looking into 2024, the greatest budgetary challenges will
be faced by Cultural Quarter’s two significant building refurbishments; MAATIC
design activity for their campus; and the continued affordability of work by
Housing Mix Delivery to increase affordable and private house building rates in
Moray.  
At a time when Moray Council and other public organisations are facing
significant budgetary challenges, it’s important to manage when and how
communications related to Growth deal activity are released. This  ensures
messages about changes to the Council or partner budgets are separate from
news about Growth Deal investment.   
4.4 Monitoring the benefits to be realised by the Deal
Significant progress has been made to ensure a firm baseline is in place on what
benefits and their associated targets will be delivered at both a programme and
project level, with a completed Benefits Realisation and Monitoring Plan due to
finalised in Q1 24/25. This is a quarter behind original projections, primarily due to
procurement delays experienced. Key activity that needs to be completed includes: 
A procurement call for consultancy support to gather evidence for programme
level indicators took place during Q3 23/24, however, this was unsuccessful
which has delayed the plan. During Q4 23/24 into Q1 24/25 the PMO will work
to secure consultancy support to complete this work.
Work has taken place with projects on the monitoring plans needed as full
business cases are developed. 
During Q1 24/25, the PMO will submit a paper to the MGD Programme Board
that draws together all of the information above into a Benefits Realisation and
Monitoring Plan. This will be include a stock check to make sure the Deal is on
track to deliver the outcomes set out when at Full Deal signing in December
2021.   
Page 63

Page 64

5. Financial summary 
5.1 Funding sources for Deal activity
During 2023 the funding landscape for the Moray Growth Deal remained static,
with no changes to the funding agreement in place between the Moray Council
and the Scottish and UK Government.   
The same capital and revenue profile as reported in the 21/22 annual report
remains valid, however, there is the potential for a reduction in the capital cost
associated with the MICM project. The profile contained within the financial model
of the approved business case, sees capital costs reduce from £6.87m to £5.6m.
During 2024 consideration will be given to how this underspend can be reallocated
to other Growth Deal activity. 
As highlighted in section 4, there is potential that projects such as Cultural Quarter
may have difficulties funding the current aspiration and scope within the existing
funding , however, work will take place to adjust construction plans and seek other
sources of funding. 
48
Grant Lodge survey
Page 64

Page 65

49
Project 
Capital
Bus Revolution
BE Hub
Cultural Quarter
Digital Health
Early Years STEM 
Housing Mix Delivery
MAATIC*
MICM 
TOTAL 
Revenue
Bus Revolution
BE Hub
Cultural Quarter
Early Years STEM 
MAATIC*
MICM
TOTAL
Scottish
Government
investment
(£’000) 
4,000
3,300
12,700
-
3,500
5,000
-
750 (610 in
project FBC)
29,250
(reducing to
29,110 due to
MICM FBC) 
-
2,000 
-
-
1,250
3,250
UK
Government
investment
(£’000) 
-
-
3,500
5,000
-
-
21,000
3,000 (2,442 in
project FBC)
32,500 
(reducing to
31,942 due to
MICM FBC) 
-
-
-
-
-
-
Local partner
investment
(£’000) 
1,000
15,400
-
1,300
2,500
3,390
3,140 (2,557 in
project FBC)
26,730
(reducing to
26,147 due to
MICM FBC) 
332 
700
1,575
-
110
2,707
Total
investment
(£’000) 
4,000
4,300
31,600
5,000
4,800
7,500
24,390
6,890 (5,609 in
project FBC)
88,480
(reducing to
87,199 due to
MICM FBC) 
332
2,000
700
1,575
-
1,360
5,957
* Level of funding expected to be higher due to private benefit in kind
contribution and HIE revenue support
Page 65

Page 66

50
5.2 Funding drawn down from Scottish and UK Governments  - Q4 22/23 to
Q3 23/24
In line with the conditions associated with Scottish and UK Government funding,
projects can only draw down funding once their full business cases have been
approved by the MGD Board, both Governments and the Moray Council. During
2023, two projects had reached this stage: 
Project 
Bus Revolution 
Digital Health 
TOTAL
Government
investment
(£’000) 
4,000 
5,000 
9,000 
Previous draw
down up to Q2
22/23 inclusive) 
0
1.505 
1,505 
Period covered
by this annual
report (Q4 22/23
to Q3 23/24) 
738 
1,293 
2,031
Draw down (all figures £’000)
Total draw
down to date   
738 
2,798 
3,536 
Page 66

Page 67

51
6. 2023 communications activity 
May 2023 saw the publication of the 2021/22 Moray Growth Deal Annual Report,
alongside a round up of the status of each project. As more projects progressed
through their planning and business case stages, activity increased during 2023.
This included media releases, social media posts and stories with live streaming
from events alongside in-person engagement activity and events, specifically: 
Bus Revolution project, m.connect on demand public transport services
The comms and marketing campaign for m.connect started with a driver
recruitment campaign in February 2023 and the commencement of services in
May. This progressed to full phase one service delivery marketing and official
Ministerial launch by August 2023. 
The launch involved the unveiling of the first name of one of the electric buses,
which was open to all residents in Moray to suggest as part of the engagement
campaign, which attracted over 200 entries. Promotion of the services and new
developments to the offering, including group bookings, continued throughout the
year. 
Business Enterprise (BE) Hub
The details of the Business Enterprise Hub were further highlighted in November
2023 as part of the wider promotion of regeneration activity planned for South
Street in Elgin.  Building on this, a drop-in exhibition was held in December 2023 to
explain the vision to local residents attracting over 600 visitors. Planning
applications and full business case approval will enable further communications
and engagement opportunities to take place in early 2024. 
Cultural Quarter
The Cultural Quarter has picked up momentum this year as details were released
on the plans for Grant Lodge and investigative works, with updates given online
and in person at local events such as Doors Open Day tours in September 2023. A
further significant milestone was marked when LDN were appointed as the design
team for Elgin Town Hall in November 2023.   
Digital Health 
Digital Health Innovation launched its Demonstration and Simulation Environment
(DSE) Space in April 2023, which propelled the communications and engagement
activity into the delivery phase. After the initial launch comms, further in-person
engagement was undertaken to encourage residents to join the citizens panel and
to highlight work being delivered by the project.   
EY STEM
Early Years STEM engagement took place at a number of Local Development Plan
events held across Moray during 2023, which included introducing the project to
local residents. 
Page 67

Page 68

Dufftown Housing Mix Consultation
Housing Mix Delivery
Updates were provided on the appointment of the design team for the Dallas Dhu
phase of the Housing Mix Delivery in April 2023, following community engagement.
The progress of activity in Dufftown was shared at drop-in exhibitions and the
South Street development was shared as part of drop in session promoting the
wider regeneration of this part of Elgin in December 2023. 
MAATIC
Due to the nature of negotiations with partners involved and changes being made
to the project vision, limited public engagement took place during 2023. Further
information will be communicated during 2024, once there is clarity on the vision
for this skills intervention project.  
MICM
Communications activity has been limited as the project worked to develop their
full business case and move away from co-locating with MAATIC to a stand along
facility on the Forres Enterprise Park.  The project entered delivery in early 2024
and communications are planned as the service hub offering is established in time
for it’s opening by autumn 2024.   
52
Page 68

Page 69

7. Programme structure and governance
structure 
7.1 Structure of Moray Growth Deal activity and Officers involved
Following the recruitment of programme and project teams during in the first half
of 2022, there has been continuity and stability in the majority of roles during
2023. This has helped maintain the pace of activity and is a contributing factor to 
the progress that has been made. 
The roles that have changed during 2023 include: 
Lynne Owen has joined the Programme Management Office as a Programme
Officer 
Allane Hay stepped down as Project Manager of the Business Enterprise Hub
following completion of the full business case. Samantha Scott, who had been
working with Allane, has now taken up this role. 
The lead body for MAATIC is now the UHI-Executive Office, with a new SRO (Max
Brown, Director of Transformation) and PM (Steven Gregg). 
Executive oversight of the Moray Growth Deal 
Rhona Gunn, Depute Chief Executive and Moray Growth Deal Senior
Responsible Officer (SRO) (Moray Council) 
Jim Grant, Head of Development Services (Moray Council) – day to day oversight 
Programme Management Office 
Michael Kelly, Programme Manager (Moray Council) 
Lynne Owen, Programme Officer (Moray Council) 
53
Page 69

Page 70

Project Delivery 
Teams in place within different organisations working to deliver the eight projects
that make up the Moray Growth Deal. 
54
Bus Revolution 
(led by Moray Council) 
PM: Stevie Robertson, Senior
Project Manager
SRO: Nicola Moss, Head of
Environmental and
Commercial Services 
Business Enterprise Hub 
(led by UHI-Moray) 
PM: Samantha Scott, BE Hub
Project Manager and Deputy
Head of Academic
Partnerships at UHI-Moray
SRO: David Patterson, 
UHI-Moray Principal 
Cultural Quarter 
(led by Moray Council) 
PM: Claire English, 
Senior Project Manager
SRO: Jim Grant, Head of Growth and
Development 
Digital Health (led by the Digital
Health Institute) 
PM: Marie Simpson, 
Programme Manager
SRO: Janette Hughes, Director of
Planning and Performance 
Early Years STEM 
(led by Moray Council) 
PM: Sarah Barnes, 
Senior Project Manager
SRO: Hazel Sly, 
Early Years Service Manager 
Housing Mix Delivery 
(led by Moray Council) 
PM: Hilda Puskas, 
Senior Project Manager
SRO: Gary Templeton, 
Strategic Planning and
Development Manager 
MAATIC 
(led by UHI-Executive Office) 
PM: Steven Gregg, 
Project Manager at UHI
Executive Office
SRO: Max Brown, 
Director of Transformation at
UHI Executive Office 
MICM (led by HIE) 
PM: David Howie, Head of
Strategic Projects
SRO: David Reid, Area Manager
(Moray) 
Page 70

Page 71

55
Project 
DHI 
MICM 
DHI 
BE Hub 
EY STEM
Assurance
gate
E:  Change 
E:  Change 
E:  Change 
E:  Change 
E:  Change
Description 
A new financial profile for the
project was presented in light of a
financial underspend in financial
year 2022/23. 
Due to a lack of certainty on the
preferred site for MAATIC and
both parties planning to co-locate,
request for MICM FBC submission
date to be delayed until May 2023. 
Updated change request
submitted following advancement
of Q4 spend and the project being
able to determine a more accurate
profile for 2022/23 spend. 
Request to change the FBC
submission date to the MGD
Board to June 2023. 
Revised preferred delivery model
presented that is affordable within
existing capital and revenue
budget allocations.
Date 
Jan 2023 
Feb
2023 
Mar
2023 
Mar
2023 
Apr
2023
Status 
Decision
delayed, more
information
required 
Approved 
Approved 
Approved 
Approved
7.2 Summary of assurance activity progressed during 2023
The Deal has a series of assurance ‘gates’ in place that, when triggered, require
submissions to be made to the MGD Board for approval to progress. 
Gates A-E are project led requests, whereas Gate F is a schedule of in-life reviews
initiated by the PMO that allows the MGD Board to take a more in-depth look at
projects that are in delivery.  During 2023 the MGD Board considered the following
assurance activity:
Gate
A B C D E F
Approval 
of Strategic
Outline 
Case (SOC)
Approval 
of Outline
Business
Case (OBC)
Approval 
of Full
Business
Case (FBC)
Closure 
of a 
project
Change
request to
previously
agreed
baseline
In-life 
review
Page 71

Page 72

56
Project 
HMD 
MICM 
Bus
Revolution 
MAATIC 
BE Hub 
MICM 
EY STEM 
Assurance
gate
E:  Change 
E:  Change 
E:  Change 
C:  FBC
approval 
C:  FBC
approval 
C:  FBC
approval 
E:  Change 
Description 
To enable evidence form the
Housing Demand and Need
Assessment, proposal to adjust
the FBC submission date to
September 2023. 
Request to decouple the project
from MAATIC regarding site
location, with a view to
progressing a preferred location
of Forres Enterprise Park.  Project
also requested an additional 3
months to finalise the FBC. 
Proposal to make a small
amendment to the financial
model, moving £19,3500 that was
underspent in financial year
2022/23 into 2023/24. 
Full Business Case (FBC) 
submitted for approval. 
Full Business Case (FBC)
submitted for approval. 
Full Business Case (FBC)
submitted for approval. 
Request to change the FBC
submission date from October
2023 to January 2024 to align with
the delivery of outputs from
professional advisors. 
Date 
Apr
2023 
May
2023 
Jun 2023 
Aug
2023 
Aug
2023 
Aug
2023 
Aug
2023 
Status 
Approved 
Approved 
Approved 
Decision
delayed,
revised version
required
following
Board
comments. 
Approved 
Approved 
Approved
Page 72

Page 73

57
Project 
CQ 
MAATIC 
HMD 
DHI 
Bus
Revolution 
DHI
Assurance
gate
E:  Change 
C:  FBC
approval 
C:  FBC
approval 
F:  In-life
review 
F:  In-life
review 
E:  Change 
Description 
Following dialogue with the
Governments, proposal presented
to take a phased approach to the
FBC due to the different
construction horizons for Elgin
Town Hall and Grant Lodge.  FBC
submission date changed to
March 2024. 
Full Business Case (FBC) 
submitted for approval. 
Full Business Case (FBC)
submitted for approval. 
In depth review of the project,
with a focus on the status of the
different living labs. 
In depth review of the status of
the project, with a focus on data
from the first six months of
m.connect services. 
In light of the Rural Centre for
Excellence securing a longer term
funding package from the Scottish
Government, request to change
the delivery window of the project
by one year (to 2026) to realise
opportunities associated with the
creation of a more integrated
digital solutions. 
Date 
Sept
2023 
Sept
2023 
Sept
2023 
Oct
2023 
Nov
2023 
Dec
2023 
Status 
Approved 
Approved, but
with revisions
to be made to
the document 
Approved 
Approved 
Approved 
Approved
Page 73

Page 74

7.3 Audit activity undertaken during 2023
Building on the scrutiny provided by the MGD Board and establishment of an in-life
review process for projects that are in delivery, it’s expected that activity will be the
subject of periodic audits. 
During the term of this report, the following internal audit activity has been
progressed: 
Closure of the 2022 Moray Council Internal Audit: Following a 2022 internal
audit by  Moray Council that rated the project’s control of the audit scope as
substantial, the Deal was asked to implement five recommendations.
Subsequently, a report1 was presented to the Council’s Audit and Scrutiny
Committee on 22 November 2023 informing members that all of the
recommendations have been successfully closed.   
Digital Health Internal Audit: Scheduled to mark the second anniversary of the
project being in delivery, the University of Strathclyde Internal Audit Service
undertook an audit of the Digital Health project. The scope focused on internal
project controls. 
58
1 Closure report on the 2022 MGD Internal Audit that is available on the Council’s
website
Page 74

Page 75

59
Page 75

Page 76

60
April 2024
Page 76

Page 77

REPORT TO: COMMUNITY PLANNING BOARD ON Thursday 
23 May 2023 
SUBJECT: CHILD POVERTY SELF ASSESSMENT 
BY: ELIZABETH ROBINSON 
1. REASON FOR REPORT 
1.1 The Child Poverty (Scotland) Act 2017 places a duty on local authorities
and regional health boards in Scotland to produce annual, joint Local
Child Poverty Action Reports (LCPARs) describing ongoing and planned
action to tackle child poverty at local level.  The Moray Council and NHS
Grampian recognise and comply with this requirement, and a Child
Poverty Strategic Group is in place to lead on implementation of the
plans. Child poverty is also a key priority for the Moray Community
Planning Partnership.  Despite this, we are still not making a significant
impact on child poverty. 
2. RECOMMENDATION 
2.1 It is recommended that the Community Planning Partnership
support the undertaking of a self assessment on progress towards
tackling child poverty in Moray. 
3. BACKGROUND 
3.1  Under the Child Poverty (Scotland) Act 2017 local authorities and
territorial health boards have a duty to produce joint annual local child
poverty action reports. 
These reports should describe actions taken in the past year – and
planned future actions – to tackle child poverty and contribute to
national targets to significantly reduce child poverty by 2030. The
reporting year begins on the 1st of April and runs to the 31st if March.   
The Improvement Service supports the development and
implementation of Child Poverty Action Plans and reports, hosting the
Item 4
Page 77

Page 78

National Coordinator for Local Child Poverty Action Reports and the
Child Poverty and UNCRC Project Officer. These staff work with local
authorities and health boards to support the development of LCPARs
by acting as child poverty champions, sharing and promoting good
practice, and working to ensure local reports are an effective lever for
tackling child poverty in Scotland. 
The Improvement Service has developed this Self Assessment tool,
which we propose to use to support and enable us as Community
Planning Partners to consider our approach to addressing child poverty
in Moray. By taking time to reflect on this work and gathering a
collective view, we will be well placed to ensure that we are bringing the
right people, resources and approach to take this important agenda
forward. 
The Improvement Service would collate responses and work with the
Moray Child Poverty Strategic Group to identify agreed strengths and
areas for improvement. 
Where this approach has worked most successfully in other areas of
Scotland, the Community Planning Partnership has taken a lead in
owning and launching the self assessment and supporting action on
the resulting recommendations. 
4. SUMMARY OF IMPLICATIONS 
The Moray Community Planning Partnership would lead on
communications and launching of the self-assessment and agree to
receive oversight reports on progress against the recommendations. 
5. CONCLUSION 
It is recommended that CPOG approve approaching the CPP with this request. 
Author of Report: Elizabeth Robinson
Consultant in Public Health
On behalf of Shelley Taylor, Chair of Moray Child Poverty Strategic Group 
Background Papers:  A link to the Self Assessment tool is available here:
LCPAR Self Assessment 2022 (smartsurvey.co.uk)    
Ref:      
Designation:  Consultant in Public Health  Name: Elizabeth
Robinson   
Page 78

Page 79

REPORT TO: COMMUNITY PLANNING BOARD 23 MAY 2024 
SUBJECT: PARTNERSHIP COMMUNITY LEARNING AND
DEVELOPMENT PLAN 2024-27 
BY: DENISE WHITWORTH, DEPUTE CHIEF EXECUTIVE
(EDUCATION, COMMUNITIES & ORGANISATIONAL
DEVELOPMENT) 
1. REASON FOR REPORT 
1.1. To update the Board on the process that the Community Learning and
Development (CLD) Strategic Partnership (CLDSP) are going through
to meet the Statutory Requirement to produce a new Partnership CLD
Plan for Moray and to give partners the opportunity to contribute to the
development of the Plan themes. 
2. RECOMMENDATION 
2.1 That partners comment on the suitability of the current themes of
the CLD Plan (1- Lifelong Learning, 2- Participation & Community
Voice, 3- Active Citizens & Community and 4- Workforce
Development) and identify any other priorities or cross-cutting
themes for consideration in the 2024-27 update. 
3. BACKGROUND 
3.1. There is a statutory requirement is to produce a three-year Community
Learning and Development (CLD) Plan in line with the requirements for
Community Learning and Development (Scotland) Regulations 2013
(CLD Regulations). Responsibility for ensuring this is done sits with the
local authority with sign off required through the Community Planning
Partnership. The plan for 2024-27 is due by 1 September 2024. 
Item 5
Page 79

Page 80

3.2. In December 2023 His Majesties Inspectorate of Education (HMIE)
published their findings on a progress visit to look at CLD provision in
Moray. The Progress Visit Report confirmed that there is effective
leadership of CLD through the partnership approach of the CLDSP and
that there is good evidence of impact. The main improvement action
was to further enhance links with independent youth organisations,
community activists/ organisations and adult learners to help shape the
next CLD Plan and to fully capture the impact of wider CLD provision in
Moray. 
3.3. In December 2023 the Minister for Higher and Further Education and
Veterans announced a national independent review of CLD. This
review would be engaging with learners and strategic partners until the
end of March 2024 with the intention of reporting back to Ministers in
June 2024. The Communities (CLD) service formally responded to the
consultation via an online survey and our Adult and Family Learning
Team co-ordinated an Adult Learner focus group session with the
review team. 
3.4. The timing of the national review is challenging as the statutory
requirement on local authorities to produce a CLD Plan by 1st
September 2024 remains. The Partnership CLD plan will therefore
need to be go to the Community Planning Partnership (CPP) for final
approval in August 2024 to meet the deadline. The current Lifelong
Learning theme (or its successor) is where partners will have scope to
consider how to strategically respond to any recommendations that
come out of the Independent Review of CLD 
3.5. New Guidance was issued by the Scottish Government on 26th April
2024 which recognised the challenge in 3.3. The Guidance stated that
all previous requirements issued for producing earlier plans remained
in place and accepted that new plans would be ‘carrying forward much
of the content of their existing plans and only reflecting significant
changes which have impacted communities and learners’. The
Guidance then states ‘Where such an approach is taken, once the
independent Review of CLD is published, education authorities are
encouraged to consider whether it is appropriate for their area to
undertake a more substantial learner and partner consultation and
update their plan accordingly…. for the remaining two years of the plan
cycle’. 
3.6. The CLD Strategic Partnership have already been consulting with
stakeholders around the current themes as they believe that these are
still relevant and consistent with the purpose of CLD – which is in line
with the new Guidance issued and referred to in 3.4.  The current plan
has four themes – Lifelong Learning, Active Citizens, Participation &
Community Voice and Workforce Development. The CLDSP are
considering whether to merge the Active Citizens and Participation &
Community Voice themes in the updated version. 
Page 80

Page 81

3.7. The Workforce Development priority will remain as this is one of the
main themes of the current national CLD Review. Moray is part of the
Learn North partnership group of Local Authority and Third Sector
learning providers and draws down a small grant from the CLD
Standards Council annually. Currently there is a survey across all
authorities to ascertain workforce development priorities. 
3.8. The Plan also has cross-cutting themes of addressing rurality and
poverty; improving mental health and well-being and addressing social
isolation. (Appendix 1- Plan on a Page). 
3.9. The process of engaging on the new CLD Plan creates a space to
identify new or emerging priorities and thus delivers on the HMIE
Progress Visit recommendations to widen partnership involvement in
producing the new plan. Staff have engaged with third sector partners
in settings such as the tsi Moray Join the Dots Conference; the
Voluntary Sector Managers Forum; Children and Young People’s
Forum, Third Sector Development Trust Managers Group and the
Fairer Moray Forum Action Group etc. This process will continue
alongside an online survey for organisations and a separate one for
individuals. 
3.10. The Adult and Family Learning team facilitated a very well attended
Learner Link-Up event for adult learners which has fed into both the
national CLD review and the CLD plan refresh. The Youth Work
Network has been meeting again and the partners are working together
collectively to identify how best we can work together to support pro-
social activities for young people. Third sector and community partners
have also shared case studies with the Fairer Moray Forum Action
group which will form the third Inequalities in Moray report. 
3.11. From the discussions at the CLDSP and with the range of partners in
3.8 and 3.9 there are emerging issues coming through                                                           
Themes   Considerations
Youth Work provision & Voice - More Life Skills and
Employability opportunities for
young people
- More community-based youth
work 
- Need for more social integration
and youth work opportunities.
- Responding to CLD review
Adult & Family Learning & Voice - Ability to access more informal
Community Based Adult
Learning and accredited
learning opportunities. 
- More opportunities to connect
with people who are isolated.
- CLDSP to look at developing a
Page 81

Page 82

Themes   Considerations
clear pathway for adult learning
opportunities in Moray. 
- Responding to CLD review
Community Development & Voice - Funding landscape is very
unclear for third sector partners.
- Third sector partners would like
to see continuation of
participatory grant making
processes.
- Increased expectations on
volunteers – particularly if public
services are reducing.
Workforce partnership provision - Learn North survey will give
indication of priority areas.
Emerging issues - Lack of affordable
activity/meeting spaces in
general – including both
localities in the LOIP.
- Need to recognise climate
change as a cross-cutting
theme in the new plan
alongside the poverty, social
isolation and mental health and
well-being themes.
- Following up on HMI
Improvement Actions. 
3.12. The Board are asked to comment on the emerging themes and areas
that they think should influence and shape the new version of the Plan. 
4. SUMMARY OF IMPLICATIONS 
4.1. There is a statutory requirement to produce a three year Community
Learning and Development (CLD) Plan in line with the requirements for
Community Learning and Development (Scotland) Regulations 2013
(CLD Regulations). Responsibility for ensuring this is done sits with the
local authority with sign off required through the Community Planning
Partnership (CPP) 
4.2. The current National Review of CLD will only be reporting to the
Minister in June 2024 so there is likely to be a lag from that time until
any recommendations become policy or strategy. The CLD Plan should
be flexible enough to respond to any change of emphasis which comes
out of the Review process as outlined in 3.4.
Page 82

Page 83

5. CONCLUSION 
5.1 The CLD SP are consulting on the new Partnership CLD Plan and
will use the feedback from this process to produce the new Plan
in time for the 1st of September publication deadline. 
5.2 The current priorities are likely to remain as they capture the core
purpose of CLD, but there is scope for other issues to be more
prominent within a particular strand or to become a future cross-
cutting theme. 
5.3 Board members are asked to comment on the suitability of the
current themes of the CLD Plan (Lifelong Learning, Participation
and Community Voice, Active Citizens and Community and
Workforce Development) and identify any other priorities or cross-
cutting themes for consideration. 
Author of Report:  Kevin McDermott, Communities Manager 
Background Papers:  
Ref:     SPMAN-1108985784-962 