Community Planning Board 
Wednesday, 15 June 2022 
NOTICE IS HEREBY GIVEN that a Meeting of the Community Planning Board is
to be held at Remote Locations via Video Conference,  on Wednesday, 15 June
2022 at 14:00. 
BUSINESS 
1. Welcome and Apologies 
2. Minute of meeting of 2 February 2022 5 - 8
3. 2021-22 Quarter 4 (January -March) LOIP Performance
Monitoring Reports
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
9 - 16
4. Plan for the Future - Strategic Intent, People, Places
Presentation by Amanda Campbell 
5. Future Community Planning Board Meetings
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
17 - 20
6. AOCB 
Any person attending the meeting who requires access assistance should
contact customer services on 01343 563217 in advance of the meeting. 
Page 1

Page 2

Page 2

Page 3

THE MORAY COUNCIL 
Community Planning Board 
SEDERUNT 
Anne Campbell  (Member)
Mr Murray Ferguson  (Member)
Mr Grant Moir  (Member)
Mr Mike Palmer  (Member)
Mr Anthony Standing  (Member)
Chief Superintendent Kate Stephen  (Member)
Mr Don Vass  (Member)
Mrs Susan Webb  (Member)
Councillor John Divers  (Member)
Councillor Juli Harris  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Neil McLennan  (Member)
Councillor Bridget Mustard  (Member)
Mr Roddy Burns  (Member)
Mr Chay Ewing  (Member)
David Reid  (Outside Body Appointee)
Councillor Tracy Colyer  (Outside Body Appointee)  
Clerk Name: Lindsey Robinson
Clerk Telephone: 07966 120593
Clerk Email: committee.services@moray.gov.uk 
Page 3

Page 4

Page 4

Page 5

MORAY COUNCIL 
Minute of Meeting of the Community Planning Board 
Wednesday, 02 February 2022 
Remote Locations via Video Conference, 
PRESENT 
Councillor George Alexander, Mr Roddy Burns, Councillor John Divers, Councillor
Tim Eagle, Mr Chay Ewing, Councillor Graham Leadbitter, Councillor Shona
Morrison, David Reid, Councillor Sonya Warren, Mrs Susan Webb 
APOLOGIES 
Anne Campbell, Councillor John Cowe, Mr Murray Ferguson, Chief Superintendent
George MacDonald, Mr Grant Moir, Mr Mike Palmer, Mr Anthony Standing, Mr Don
Vass 
IN ATTENDANCE 
Also in attendance at the above meeting were the Depute Chief Executive
(Economy, Environment and Finance), Depute Chief Executive (Education,
Communities and Organisational Development), Head of Governance, Strategy and
Performance, Acting Head of Children, Families and Justice Social Work Services,
Quality Assurance and Locality Manager, Communities Service Manager (all Moray
Council, David Allan, SCDC Scotland and Tracey Sutherland, Committee Services
Officer as Clerk to the Board.   
1.         Welcome and Apologies 
The Chair, Councillor Graham Leadbitter, welcomed everyone to the meeting of the
Board.  
In particular, he welcomed David Reid, Highlands and Islands Enterprise and Chay
Ewing, Scottish Fire and Rescue Services to their first meeting of the Board.    
2.         Order of Business 
The Chair sought agreement from the Board to take Item 4 on the agenda before
Item 3.  This was unanimously agreed.  
3.         Minute of meeting 17 November 2021 
The minute of the meeting of 17 November 2021 was submitted and approved as
an accurate record of the meeting.    
Item 2.
Page 5

Page 6

4.         Localities Supporting Place Based Approaches in Moray 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) provided the Board with the report undertaken by the
Scottish Community Development Centre (SCDC) 'Supporting Place Based
Approaches in Moray' which provides a review of locality planning in Moray.  
Mr Allan from SCDC gave a brief presentation on the findings of the report and
answered questions from the Board.  
Following consideration the Board agreed to:  
i)  Note the the report undertaken by the Scottish for Community Development
Centre (SCDC) ‘Supporting place-based approaches in Moraywhich
provides a review of locaility planning in Moray (Appendix 1);       
ii)  Agree that the CLD Strategic Partnership continue to report back regularly
to the CPP Board on the delivery of the CLD Plan and on progress on the
Locality Plans in Buckie and New Elgin;     
iii)  That the reporting and performance indicators used will be simplified and
refreshed in line with the current reviews of the existing Buckie and New
Elgin Localities Plans;     
iv)  That an annual report on progress made in each Locality will be presented
to the CPP Board identifying three high level priorities for future
development and requests for additional input / support from the CPP;     
v) That reporting on the Localities Plans should also be considered by the
Community Engagement Group – and that community representatives
should be encouraged to participate in that setting; and     
vi) Agree to widen membership of the CLD Strategic Group to ensure
reciprocal involvement across LOIP lead groups.    
5.         Locality Plan Discussion Paper 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) invited the Board to consider how to progress
community planning partnership locality planning across Moray.  
Following consideration the Board agreed to  
i) note the positive work that has taken place in partnership with Communities
in Buckie Central East and New Elgin East; and    
ii) progress locality planning for the community planning partnership by linking
up with the planned work by the Council in Forres, Keith and Lossiemouth to
bring in issue specific partner support or lead where a need is identified with
any further involvement dependent upon resources for each partner.   
Page 6

Page 7

6.         LOIP Review Preparation 2022 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) asked the Board to consider a mid-point review of
the Local Outcomes Improvement Plan (Loip) 10 year plan during 2022, which
would also enable the Loip to be reset to take account of covid impacts and
recovery. The Board is also asked to consider a proposal for the community
engagement for the review to run in parallel with the Council process for its
Corporate Plan following the local government election in May 2022.  
Following consideration the Board agreed:  
i) to undertake a mid-point review of the LOIP 10 during 2022; and    
ii)  that the Community Engagement for the review runs in parallel with Council
Engagement for its Corporate Plan, to enable the most efficient use of
resources and maximise the impact of partnership actions in the revised
plans.   
7.         AOCB 
The Board noted that no further issues were raised.  
The Chair, in recognising that this was the last meeting of the Board with the
current cohort of Members, thanked everyone for their contribution over the last 5
years.   
Page 7

Page 8

Page 8

Page 9

REPORT TO: CHIEF OFFICERS GROUP ON 25 MAY 2022 and then
COMMUNITY PLANNING BOARD ON 15 JUNE 2022 
SUBJECT:  2021-22 QUARTER 4 (JANUARY - MARCH) LOIP 
PERFORMANCE MONITORING  REPORTS 
BY: DEPUTE CHIEF EXECUTIVE (EDUCATION,
COMMUNITIES AND ORGANISATIONAL
DEVELOPMENT), MORAY COUNCIL 
1. REASON FOR REPORT 
1.1  To inform the Group of the performance against the Local Outcome 
Improvement Plan (LOIP) for the period to 31 March 2022. 
2. RECOMMENDATION 
2.1  It is recommended that the Group – 
(i) scrutinises and notes the progress reported in the
templates hyperlinked to this report taking account of the
impact responding to and recovering from the pandemic
has had on partner organisations; 
(ii) considers changing the frequency of reporting from
quarterly to half yearly to reflect the longer term timescales
of priorities. 
3. BACKGROUND 
3.1  The Community Planning Board on 28 April 2021 agreed the LOIP 
delivery frameworks, recognising  them as an evolving area of work 
that will continue to develop.   
3.2 The Community Planning Board on 22 September 2021 agreed the use
of Pentana (performance monitoring software) for the presentation of
future monitoring reports which is ongoing.  This report gives narrative
summary on progress on LOIP priorities with links to Pentana styled
backing tables. The tables aim to capture progress against the delivery
frameworks as well as recognise efforts around response and recovery.
Item 3.
Page 9

Page 10

3.3 Refinement of performance indicators and actions remains variable
across priorities due to delivery plans and partnership strategy action
plans developing on different timelines.  Some of the original delivery
plan measures cannot be reported on as the data is not collected. 
These will be replaced with the relevant strategy action plan measures
where available to evidence LOIP outcomes. 
3.4 Delivery Plans provide a sharper focus which aims to enable the 
Group to give attention to a narrower range of priorities.     
3.5 The Group and Board is invited to consider and apply scrutiny in
assessing whether the information contained gives reasonable
assurance on progress against LOIP priorities and actions to mitigate
risks and issues.   
3.6 Building a better future for our children & young people in Moray 
Work continues across the three focus areas. 
LOIP PRIORITIES RAG
The emotional and mental wellbeing of children and young
people is improved 82%
Children live in safe and supportive families 60%
The impact of poverty on children, young people and families is
mitigated 47%
OVERALL PRIORITY PROGRESS
Children and young people live in communities where their
voice is heard and they are build up to be all they can be
68% 
Progress summary - 
3.6.1 With the majority of planned work complete, good progress has 
been made in improving the emotional and mental wellbeing of children 
and young people.  £1.1m investment was secured in early 
intervention and prevention services.  In the year to March 2022, there 
were around 1,100 children, young people and family referrals to the 
Family Wellbeing Service, Counselling in Schools and locality planning 
model with one third completing their programme of support. 
Commissioned services have begun to report on outcomes, on 
average 82% of children, young people and families showed 
improvement or had met expected outcomes.  Development of a 
wellbeing website for families to access information and support is 
progressing out with the original due date of April 2022, with delays 
due to capacity issues. 
3.6.2 The Better Meetings Project is just one of the work streams ensuring 
that children and young people become more involved in their 
meetings, early indications are that there is better evidence of views 
within  reports and plans.  The Project Lead and Engagement Officer 
have been gathering data for self-evaluating progress made against 
the five foundations of The Promise: Voice, Family, Care, People and 
Scaffolding that will inform an implementation plan.  Training on the
Page 10

Page 11

use of Outcome Star tool has been undertaken for social workers and 
partners as an initial step in rolling out the tool to allow consistent 
measurement and evidence of improved outcomes.  As at March 2022, 
there were 178 Looked after Children (LAC), 82% were cared for in a 
community setting and 18% in a residential setting.  Recently published 
2020/21 benchmarking data reports that of a cohort of 16, 69% of LAC 
leavers achieved one or more qualification at SCQF Level 4 or better, 
above the national average of 57%, there were no achievements at 
SCQF Level 5 against the national average of 24%.  Of the 2020-21 
LAC leavers, 75% entered an initial positive destination, below the 
national average of 88%.   
3.6.3 Work in mitigating the impacts of poverty is progressing in line with 
expected due dates.  Early insights to a research study into the 
experiences of the implementation of the Financial Inclusion Pathway 
evidence the difficult choices families are having to make in order to 
provide for their children and the level of acceptability of questioning 
around financial status, learning points will inform improvement in 
approaches.  Making Every Opportunity Count (MEOC) toolkit has 
been updated with a specific focus around poverty to identify local 
supports.  Quality improvement methodology support, provided by the 
Scottish Government, will ensure  approaches deliver improvement that 
can be evidenced. 
Risks and Issues -
3.6.4 The lack of Lead Officer support available to the multi-agency Child
Poverty Group and general capacity is limiting the pace of progress of
the child poverty priority.  The GIRFEC Leadership Group is exploring
options and the council Senior Project Officer (Poverty) is offering
support as capacity allows. 
3.6.5 Recruitment and retention of staff continues to be a challenge in the 
delivery of the wellbeing needs of children.  There has been an 
increase in staff moving between organisations or working for more 
than one, impacting on service delivery.  The third sector are investing 
in new recruitment methods but as yet the problem of unfilled posts 
and built experience remains. 
3.7 Empowering and connecting communities   
The pace of progress has increased and delivery is as expected at this
stage against the two focus areas contributing to this priority. 
LOIP PRIORITIES RAG
Develop stronger, more resilient, supportive, influential and
inclusive communities 75%
Improve life chances for people in Moray of all ages in
communities experiencing the greatest inequality 73%
OVERALL PRIORITY PROGRESS
Thriving and well connected place, where more people live
well
74% 
Page 11

Page 12

Progress summary -
3.7.1 The action to develop and implement a community wellbeing survey
will be reframed going forward to better reflect the role that health and
wellbeing plays in all community engagements.  Outputs from recent
community consultations in Buckie and Lossiemouth have been
circulated amongst council services and partner agencies to identify
work already in place or planned that responds to the community
priorities highlighted.  Community anchor organisations in Lossiemouth
and Forres are being supported in their engagements to extend the
reach and involvement of communities, each at the mid-point of an
eight staged process, with initial mapping undertaken in Keith.  Existing
locality plans continue to be supported, in Buckie a steering group has
been formed to explore establishing a Development Trust and
community lunches at the Fisherman’s Hall restarted in April with
funding secured to hold taster sessions for new activities to widen the
Hall’s usage.  In New Elgin, the working group have revised their
locality plan identifying four main themes, with sub groups set up to
drive delivery.  An event ‘Make the Most of Your Pension’ in February,
brought older residents together to hear from partner agencies.  The
Community Support Unit are committed in working with communities on
Community Asset Transfers (CATs), initial assessments were
completed for Forres Skate park Group and Garmouth and Kingston
Community Association, Buckie Fisherman’s Hall gained court approval
in April 2022 and Portknockie Community Association was supported in
achieving SCIO status. 
3.7.2 Building capacity progressed with tsiMoray forming an inclusive
working group to prioritise and allocate £250k funding from the Mental
Health and Wellbeing Fund to 40 different projects to address local
needs.  tsiMoray also supported Just and Green Moray sessions in
Dufftown and Portgordon.  Community Resilience Plans continue to
develop in a number of localities supported by the Community Support
Unit and partner organisations.  In the year ended March 2022, the
Adult and Family Learning team has seen a marked increase in adult
learning.  Learners’ achievements will be celebrated in an event that
will also consider future learning needs. 
Risks and Issues -
3.7.3 Nothing to report.  
3.8 Growing diverse, inclusive and sustainable economy 
Three focus areas are complete, with the remaining focus area subject 
slippage. 
LOIP PRIORITIES RAG
Increased participation, skill and pay levels with reduced gender
inequality through pathways to employment and higher skilled
employment
100%
Increased participation, skill and pay levels with reduced gender
inequality through targeted approaches for those furthest from
the job market
100%
Page 12

Page 13

Increased participation, skill and pay levels with reduced gender
inequality through choices for the young workforce 100%
Increased participation, skill and pay levels with reduced gender
inequality through apprenticeships at all levels 24%
OVERALL PRIORITY PROGRESS
By the year 2030 Moray will have a sustainable and inclusive
economy which generates improved opportunities for
everyone, including more skilled and higher paid jobs
68% 
Progress summary -
3.8.1 Planned work during 2021/22 to increase the current early learning and 
childcare provision and expand the programme to meet demand was 
completed and parents offered flexibility to choose their childcare 
provider and the hours based on their funded entitlement.   
3.8.2 In the year ended March 2022, 106 people were employed through the 
the Moray Employer Recruitment Incentive (MERI) scheme, an 
increase from the 73 people employed in 2020-21.  With just one 
third of those participating female, the Local Employability Partnership 
are exploring options to improve the gender balance going forward. 
The scheme provides up to £8k for newly created jobs and aims at 
helping people of all ages with the greatest barriers to employment, get 
and stay in jobs.  A total of 361 people were supported through the 
Council’s Employability Service in the year to March 2022, a significant 
increase on the previous year.  103 people were supported into 
learning, training or work.  Moray  Pathways at the Inkwell employability 
and training hub, in increasing participation through targeted 
approaches for those furthest from the job market, attracted 304 
attendances in 2021-22, falling short of target (400) as a result of 
delays in opening due to the pandemic. 
3.8.3 For the period to March 2022, 161 Kickstart placements have been 
filled through Moray Chamber of Commerce.  61 young people have 
finished the scheme by completing their six month placement, likely to 
increase to around 90 if including those placements still live. 
Assessing the universal success of the single year Kickstart Scheme is 
not possible as data from the Department for Work and Pensions 
(DWP) is not publically available. 
3.8.4 Development of an Apprenticeship Strategy and Action Plan is 
progressing, albeit out within original timescales.  It is anticipated that 
the draft strategy will be presented to the Board in September 2022. 
Risks and issues –
3.8.5 Assessment of the Kickstart scheme can only be based on available
data from the Chamber of Commerce as DWP data not published. 
3.9  Improving well-being of our population 
Progress on track to deliver against the three focus areas contributing
this priority.  Definitions around wider wellbeing priorities still to be
considered and incorporated in future reporting.
Page 13

Page 14

LOIP PRIORITIES RAG
A whole population approach to prevention and reducing related
harms – prevent and reduce alcohol and drug related harms 80%
A whole population approach to prevention and reducing related
harms – there is a reduction in alcohol and drug related harm
and improvement in people’s wellbeing
100%
A whole population approach to prevention and reducing related
harms – promote engagement into treatment care and support
and ensure the consistency of alcohol and drug service provision
across Moray: supporting community services in meeting the
needs of those using services where alcohol and drug use is a
factor
100%
OVERALL PRIORITY PROGRESS
People are healthier and experience fewer harms as a result
of making well informed decisions about their health and
well-being
93% 
Progress summary -
3.9.1 Services are fully operational and data shows increasing demand for
services with 641 clients in specialist services as at March 2022. 
Comprehensive support packages are provided through the partnership
of Moray Drug and Alcohol Services (MIDAS) and Arrows to prevent or
reduce related harms.  The Scottish Government’s Drug and Alcohol
Intervention Service for Young People (DAISY) system is slowly
developing however limitations around data extraction are unlikely to
be resolved until late 2022 at the earliest.   
3.9.2 Recovery outcomes continue to show an average improvement from
Assessment through 3, 6 and 12 month intervals, on average 56% of
clients reported improvement in physical and mental health and
wellbeing.  The service, generally continues to meet its waiting time
targets of 72 hours and 3 weeks albeit target timescales were missed
on 7 occasions in quarter 4, which the partnership are looking into. 
The partnership has increased the investment in service taking account
of the Medically Assisted Treatment (MAT) standards to address issues
that reduce the barriers around accessing services; premises, location
and availability, a key challenge for Moray being suitable
accommodation to support closer working between Arrows and MIDAS. 
The Recovery Café is fully operational and part of the recovery
network, it provides volunteering opportunities that build recovery
capital and confidence. 
3.9.3 Development of the workforce continued throughout 2021-22 and a
training calendar is in place and aligned to locality networks for the
coming year. 
Risk and issues -
3.9.4 Scottish Government are aware of concerns raised by partnerships 
around reporting capabilities of DAISY.  Funds have been set aside for 
the recruitment of a data analyst, which will alleviate some of the 
capacity issues around data extraction. 
Page 14

Page 15

3.9.5 Impact of service needs in taking forward and meeting the Medically 
Assisted Treatments (MAT) standards, in particular accommodation for 
the MIDAS Service to meet the diverse and complex needs of those 
requiring support.  Funds have been allocated  for improved 
accommodation and an additional nurse prescriber, which will assist in 
reducing alcohol and drug related harms. 
4. SUMMARY OF IMPLICATIONS 
4.1. As a performance report, there are no direct financial, workforce,
equalities, policy or legal issues from this report. 
5. CONCLUSION 
5.1. The report provides reasonable assurance of progress made against
LOIP activities and highlights particular risks and issues associated
with each priority. 
Author of Report:   Louise Marshall, Strategy and Performance Manager
Background Papers: CPB 16/09/20 LOIP 2nd edition approved (item 4) 
CPB 28/04/21 LOIP Development of Delivery
Framework Update (item 3) 
Building a better future for our children & young people
in Moray – Actions and Indicators table 
Empowering and connecting communities – Actions and
Indicators table 
Growing diverse, inclusive and sustainable economy –
Actions and Indicators table                                     
NEW Actions and Indicators table.pdf 
Improving well-being of our population – Actions and
Indicators table 
Actions and Indicators table - NEW.pdf 
Ref:     SPMAN-957343068-2171 
Designation:  Depute Chief Executive   Name: Denise Whitworth   
(Education, Communities &   
Organisational Development)
Page 15

Page 16

Page 16

Page 17

REPORT TO: COMMUNITY PLANNING BOARD ON 15 JUNE 2022 
SUBJECT: FUTURE COMMUNITY PLANNING BOARD MEETINGS 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES, AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To ask the Board to consider future arrangements for holding meetings of the
Community Planning Board going forward now that Covid restrictions have
been lifted. 
2. RECOMMENDATION 
2.1 It is recommended that the Board agrees: 
i) how meetings will be held going forward as per the options in
section 4; and 
ii) whether the meetings should be webcast to allow members of the
public to view the meetings. 
3. BACKGROUND 
3.1 Prior to the Covid restrictions the Board meetings were held face to face in
various locations.  The meetings moved online from 16 September 2020 and
have remained that way ever since. 
3.2 The meetings of the Board have never been webcast due to the varying
locations of the meetings, however the Board may wish to consider
webcasting the meetings to allow members of the public to view the meetings
should they wish.   
4. FUTURE MEETING OPTIONS 
4.1      Now that social distancing restrictions have been lifted there are a number of 
options for the Board to consider. 
4.2      The options are as follows: 
• Continue with meetings online
• To return to face to face meetings
Item 5.
Page 17

Page 18

• To have a mixture of face to face and online meetings (hybrid
meetings)
• To have the meetings webcast 
4.3      For the meetings to be webcast, the Board would need to use either Connect 
Remote or the Council Chamber as the meeting base. 
Continue with Meetings Online
4.4      If the Board wish to continue holding the meetings remotely then there will be 
no change to the current arrangements.  The online meetings can be webcast 
if that is the Board’s decision. 
Return to Face to Face Meetings
4.5       If the Board wish to return to face to face meetings then the meetings can be 
held in any location.  If the Board wish to webcast the meetings then the face 
to face meetings will need to take place in the Council Chamber, 
Headquarters, and Elgin, to allow use of the webcasting equipment in the
Chamber. 
Hybrid Meetings
4.6      The Council have recently purchased a new hybrid meeting system which   
would mean the Board members can meet face to face and also have 
members joining remotely.  Again, to use this facility the meetings would need 
to take place in the Council Chamber. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and
The scheduling of appropriate meetings facilitates good governance
arrangements and supports the delivery of the Strategic Plan. 
(b) Policy and Legal
There are no policy or legal implications arising from this report. 
(c) Financial implications
There are no financial implications directly arising from this report. 
(d) Risk Implications
None directly arising from this report. 
(e) Staffing Implications
There are no staffing implications directly arising from this report. 
(f) Property
There are no implications in terms of Council property directly arising
from this report. 
(g) Equalities/Socio Economic Impact
An equalities impact assessment is not required as there is no change to
service delivery arising as a result of this report. 
(h) Climate Change and Biodiversity Impacts
Page 18

Page 19

Online meetings reduce the impact on the environment through
reduction of travel so a decision to move to hybrid or face to face
meetings will increase impact. 
(i) Consultations
Consultations have been undertaken with the following who are in
agreement with the content of this report where it relates to their area of
responsibility. 
• Depute Chief Executive (Education, Communities, and
Organisational Development) 
6. CONCLUSION 
6.1.  The Board is asked to agree on how they wish meetings to be held in the 
future.   
Author of Report:  Lindsey Robinson, Committee Services Officer. 
Background Papers: N/A
Ref: SPMAN-957343068-2172 