Community Planning Board 
Wednesday, 03 June 2026 
NOTICE IS HEREBY GIVEN that a Meeting of the Community Planning Board is to be
held at Committee Room, Council Office, High Street, Elgin, IV30 1BX on
Wednesday, 03 June 2026 at 14:00. 
BUSINESS 
1.  Sederunt 
2.  Minute of the meeting held 11 February 2026  5 - 12 
3.  NHS Grampian as a Public Health Organisation
Report by Director of Public Health, NHS Grampian 
13 - 48 
4.  Getting It Right For Everyone
Report by Interim Deputy Head of Service, Health and Social Care Moray 
49 - 54 
5.  Multi-Agency Work to Support Young People
Report by GIRFEC/The Promise Strategic Lead, and the Chief Education
Officer 
55 - 78 
6.  Maximising Socio Economic Impacts for Renewable Energy
Report by Executive Director Economy, Enterprise and Operations 
79 - 86 
7.  Moray Growth Deal 2025 Annual Report
Report by Executive Director Economy, Enterprise and Operations 
87 -
152 
8.  Whole Family Wellbeing Fund Governance
Report by Interim Chief Social Worker/Head of Service 
153 -
170 
9.  AOCB 
Page 1

Page 2

Page 2

Page 3

THE MORAY COUNCIL 
Community Planning Board 
SEDERUNT 
Councillor Kathleen Robertson (Chair)
Councillor Amber Dunbar (Depute Chair)  
Ms Connie Calvo (Member)
Ms Karen Greaves (Member)
Councillor Sandy Keith (Member)
Councillor Scott Lawrence (Member)
Ms Jackie Maclaren (Member)
Councillor Marc Macrae (Member)
Mr Grant Moir (Member)
Ms Shantini Paranjothy (Member)
Mr David Reid (Member)
Mr Dennis Robertson (Member)
Chief Superintendent Kate Stephen (Member)
Ms Caroline Webster (Member)
Mr Andrew Wright (Member)
Councillor Bridget Mustard (Outside Body Appointee)  
Gp Capt Sarah Brewin (Non-Voting Member)
Ms Sarah Medcraf (Non-Voting Member)
Lt Col James Walker (Non-Voting Member)
Clerk Name: Lindsey Robinson
Clerk Telephone: 07966 120593
Clerk Email: committee.services@moray.gov.uk 
Page 3

Page 4

Page 4

Page 5

MORAY COUNCIL 
Minute of Meeting of the Community Planning Board 
Wednesday, 11 February 2026 
Committee Room, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Ms Connie Calvo, Councillor Amber Dunbar, Ms Karen Greaves, Councillor Sandy
Keith, Councillor Scott Lawrence, Councillor Marc Macrae, Ms Sarah Medcraf,
Councillor Bridget Mustard, Ms Shantini Paranjothy, Mr Dennis Robertson, Councillor
Kathleen Robertson, Chief Superintendent Kate Stephen 
SUBSTITUTES 
Wing Commander Dowds (RAF Lossiemouth) attended on behalf of Group Captain
Sarah Brewin.
Ann Griffin (Barrack Staff Officer, 39 Engineers, Kinloss) attended on behalf of
Lieutenant Colonel James Walker.
Group Commander David Hendry (Scottish Fire and Rescue Service) attended on behalf
of Area Commander Andrew Wright. 
APOLOGIES 
Gp Capt Sarah Brewin, Ms Jackie Maclaren, Mr Grant Moir, Mr David Reid, Councillor
John Stuart, Lt Col James Walker, Ms Caroline Webster, Mr Andrew Wright 
IN ATTENDANCE 
The Executive Director Economy, Enterprise and Operations; Chief Officer Moray
Integrated Joint Board; Chief Governance Officer (Monitoring Officer); Head of
Operations and Environment; Service Manager Leisure and Culture; Service Manager
Transportation; and Lindsey Robinson, Committee Services Officer, all Moray
Council; Place Director for Moray, Scottish Government; and Elizabeth Robinson,
Consultant in Public Health, NHS Grampian. 
1.         Chair 
Councillor Kathleen Robertson chaired the meeting. 
2.         Minute of the meeting held 26 November 2025 
The minute of the meeting held 26 November 2025 was submitted and approved. 
As a point of accuracy, the Consultant in Public Health confirmed that at the time of
the last meeting Ms Paranjothy was Director of Public Health, not Interim Director of
Public Health. 
The Clerk advised the minute would be updated. 
Item 2.
Page 5

Page 6

3.         Vary Order of Business 
In terms of Standing Order 29, the Chair sought agreement from the meeting to vary
the order of business set down on the agenda and take item 8 "Wildfire Update, as
the first item of business in order to allow those presenting the verbal update to
depart the meeting at the earliest convenience.  This was unanimously agreed. 
4.         Wildfire Update 
The Head of Operations and Environment gave a verbal update on the planning for the
Wildfire Summit to be held on 26 February 2026. 
The Scottish Government Place Director for Moray asked for the proposed agenda to
be emailed to him to allow it to be circulated to colleagues.  He added that the
Scottish Government would be happy to provide a further update. 
The Chair of Moray Integration Joint Board (MIJB) sought clarification on whether the
register of vulnerable people could be used for hot spot areas. 
In response, the Head of Operations and Environment suggested that this would be
better discussed at the summit as to whether it would form part of the wildfire plan or
the emergency response. 
Councillor Robertson added that she was looking forward to the summit and the
discussions to be had.  
5.         Whole Systems Approach - Physical Activity (Update) and Healthy Weight
(New) 
The meeting had before it, a report by the Executive Director Education, Housing and
Communities, Moray Council, and the Consultant in Public Health, NHS Grampian,
providing the Board with an update on the development of the Systems Based
Approach to Physical Activity in Moray and, to ask Community Planning Partner
leadership teams to embed the priorities of this approach into relevant local and
regional strategies and provide capacity within their teams to support the practical
delivery of this approach. 
It further provided the Board with information on a new Whole Systems Approach
model for Healthy Weight in Moray and requested support and endorsement for the
approach. 
During consideration, Councillor Robertson sought clarification on whether there
would be measurable outcomes included in future reports. 
In response, the Service Manager Leisure and Culture confirmed that a lot of data had
been captured, and the outcomes would be shown going forward. 
The Consultant in Public Health advised that Public Health Scotland were also
looking at how to measure the outcomes. 
Councillor Lawrence was of the opinion that it was good to see a piece of community
planning right from the outset, and that it was a long-term piece of work.
Page 6

Page 7

Councillor Keith sought clarification on how small changes would be measured as it
was a long-term project. 
The Consultant in Public Health advised that Primary 1 age children have their BMI
measured annually and trends would be shown in that.  She added that the NHS
would see people in Primary Care settings and on waiting lists for weight
management.  She warned that the increase in weight loss drugs could show a higher
change in the trend rather than the actual change. 
The Service Manager Leisure and Culture added that partners have quarterly Key
Performance Indicators (KPIs) to report on, and these would also form part of the
responses. 
The Area Manager for Moray and Orkney, Skills Development Scotland (SDS) sought
clarification on whether there were links to help people get to appointments. 
The Service Manager Leisure and Culture advised that the Service had reached out to
planning and transportation. 
Councillor Robertson added that there was a link within the report that took you to an
interactive site where you could enter your postcode and see options available. 
The Chair of the MIJB sought to ensure that appropriate monitoring was put in place in
schools to ensure weight loss was not taken to extremes.  He added that there was a
lot of information available for teachers but there was a need to ensure that it was not
triggering for vulnerable teenagers. 
Thereafter, the Board unanimously agreed to: 
i. continue to recognise the importance of these programmes in creating and
maintaining good health and preventing ill health, focussing support on the
people and communities who need it the most, and changing systems and
environments to support individuals to stay healthy; 
ii. note the progress made in relation to the Systems based Approach to
Physical Activity (which will be branded Active Moray), scrutinise the plan
and strategy content to ensure alignment with strategic outcomes for
Moray; 
iii. embed the priorities from the strategy into relevant local and regional
strategies of community planning partners and provide capacity within
their teams to support the practical delivery of Active Moray; 
iv. raise awareness of Health and Social Care Moray's commitment to lead
and progress a Whole Systems Approach to Healthy Weight; and 
v. endorse the collaborative intentions of the 2 approaches whilst
acknowledging the separate working groups to drive forward the distinct
actions. 
6.         Update on Poverty in Moray
Page 7

Page 8

The meeting had before it, a report by the Consultant in Public Health, NHS Grampian
updating the Board on Child Poverty Data for Moray and progress towards a new
strategic approach to child poverty reduction. 
During consideration, Councillor Lawrence sought clarification on whether the
strategic paper would show the reasons why Moray does not follow the Scotland wide
trends. 
The Consultant in Public Health advised that there is a need to understand how
broad-brush policies affect people.  She added that flexible working, childcare, and
affordable housing alongside a higher wage economy need to be looked at to pull
people out of poverty long term. 
Councillor Lawrence was of the opinion that there needs to be a deeper
understanding of the economy in Moray, why it is a low wage economy and why the
gender pay gap in Moray is reversed. 
Councillor Keith sought clarification on why there was no mention of the removal of
the two-child benefit cap and was of the opinion that partner responses should be
focused on urban areas as that is where child poverty is highest. 
The Consultant in Public Health advised that she had asked for the calculations and
would update the Board once these had been received.  She added that it ties into the
Moray Growth Deal and the Moray Economic Partnership.  She was of the opinion that
long and short term work would be required to understand what investment would be
needed where. 
Councillor Robertson advised that as the Highlands and Islands Regional Economic
Partnership (HIREP) was receiving no new Local Growth Fund (LGF) funding, she was
prepared to write to the Scottish Office to highlight the impact of this. 
The Consultant in Public Health advised that the letter would need to be specific in
the reasons the funding was needed and to highlight that remote and rural poverty is
often overlooked. 
The Chief Executive, Moray Council was of the opinion that any letter would need to
include a good case for the funding.  She added that economic development and
better wages would require upskilling of staff. 
The Chief Executive, Moray Chamber of Commerce advised that they had completed
some analysis on the cost of childcare.  Assuming someone earned £30,000 per year
and worked Monday - Friday, 9am - 5pm, the analysis showed that after paying for
childcare that person would have £500 a month left to live on.  She added that
£30,000 was higher than the Moray average wage. 
The Chair of the MIJB and Councillor Keith were supportive of a letter being written as
long as it was evidence based and people did not have their benefits affected. 
Thereafter the Board unanimously agreed: 
Page 8

Page 9

i. to note the latest Child Poverty Data for Moray and the development of a
Lived Experience panel and Delphi method to build a consensus set of 3–5
priority anti-poverty interventions for Moray (short-, medium-, and longer-
term); and 
ii. for the Chair to write to the Scottish Office regarding the impact of the loss
of LGF funding. 
7.         Director of Public Health Annual Report 2024-25 
The meeting had before it, a report by the Director of Public Health, NHS Grampian
providing the annual report for the Board showing an updated overview of population
health data for Grampian. 
During consideration, Councillor Lawrence sought clarification on how it aligns with
the Public Health Framework. 
The Director of Public Health advised that the Consultant in Public Health was
working on integrating the framework with partners and looking at how to support
this.  She added that it was a work in progress but needed more focus.  She further
added that the framework gives it a priority. 
The Consultant in Public Health advised that in Moray there was a very active
multiagency group looking at child and adolescent mental health.  She added that
poverty, poor housing and unemployment would all have an impact. 
Councillor Lawrence sought clarification on whether the development of a
neurodiversity pathway delivery tool could be connected to the Special Educational
Needs tools. 
The Director of Public Health advised that funding had been provided for
neurodiversity pathway development, and she stated that she would make
connections to the education department. 
Thereafter the Board unanimously agreed to: 
i. reflect on how to continue to incorporate the voices of children and young
people into decision making and planning of services; and 
ii. note the commitment to the production of comprehensive population-
based needs assessments for children and young people in Grampian
during summer 2026 to inform the development of plans for Children’s
Services, Child Poverty, Corporate Parenting and Children’s Rights. 
8.         Place Director and Community Planning Partnership Charter 
The meeting had before it, a report by the Chief Executive, Moray Council informing
the Board of the work undertaken by Scottish Government and COSLA to develop a
Place Director Charter, setting out expectations and how they will be supported by
Community Planning Partnerships. 
Page 9

Page 10

During consideration, the Scottish Government Place Director for Moray advised that
this was not to be a supervisory role, he would be there to facilitate communication. 
The Director of Public Health stated that she welcomed the introduction of the
charter and the opportunity to come together with the Place Director. 
Councillor Lawrence sought clarification on how was best to make use of the Place
Director role. 
The Scottish Government Place Director for Moray advised that he was happy to have
conversations with all partners outwith the Board setting and he could help point to
the right people to speak to on numerous topics. 
The Chief Executive, Moray Council sought clarification on how this could be
achieved in a practical sense.  She suggested having a discussion outwith the
meeting to look at the potential for catchups every 6 months. 
Thereafter the Board unanimously agreed to provide endorsement in principle for the
draft charter. 
9.         Health and Transportation Action Plan (2024-2029) 
The meeting had before it, a report by the Service Manager Transportation updating
Board members regarding the review of the Health and Transport Action Plan (HTAP)
(2024-2029) and implementation of new structures to support action-focussed
delivery objectives. 
During consideration, Councillor Dunbar sought clarification on what were the
barriers to public transport. 
In response, the Service Manager Transportation advised that they had used an AI
simulation to show where the healthcare was situated, what transport options were
available and how to connect people to the main transport corridors. 
Councillor Lawrence sought clarification on how the plan would adapt to a changing
healthcare picture across Moray and Grampian. 
The Service Manager Transportation advised that the plan was dynamic, allowing the
group to meet as often or as little as is necessary.  The group can meet to react to any
changes. 
The Chief Officer Moray Integration Joint Board advised that they work in partnership
with the team to make them aware of any changes before they happen. 
Thereafter the Board unanimously agreed to: 
i. note the contents of this report and the new Health & Transport Action Plan
2024-2029; 
ii. note the ongoing work of partners to ensure all partner organisations are
engaged and committed to the new HTAP; and 
Page 10

Page 11

iii. support the delivery of actions agreed by the HTAP Steering Group. 
10.         AOCB 
Councillor Robertson sought an update from Police Scotland on the Community
Alcohol partnership. 
In response, Chief Superintendent Stephen advised that the initiative launched on 3
February 2026 to help address underage drinking and health and wellbeing.  The full
launch would take place on 27 February 2026 at the Gleaner Arena in partnership
with Elgin Sports Community Trust (ESCT), who will be providing Friday night football
for the over 12s.  She confirmed that other partners include Action for Children,
Quarriers, Arrows, and Aberlour Children's Trust. 
Ms Medcraf advised that work was underway at the Moray Economic Partnership to
ensure a positive flow of information between all of the partner groups. 
Page 11

Page 12

Page 12

Page 13

REPORT TO: COMMUNITY PLANNING BOARD ON 3 JUNE 2026 
SUBJECT: NHS GRAMPIAN AS A POPULATION HEALTH
ORGANISATION AND POTENTIAL FOR ALIGNMENT WITH
NEW LOCAL OUTCOME IMPROVEMENT PLAN 
BY: DIRECTOR OF PUBLIC HEALTH, NHS GRAMPIAN 
1. REASON FOR REPORT 
To brief the Community Planning Board on the model for the NHS as a
Population Health Organisation that has been shared with COSLA and
how this is being progressed in NHS Grampian. This includes NHS
Grampian’s strategic priorities for 2026/27 for consideration by the CPB
Board, particularly in relation to alignment with the proposed
redevelopment of the Moray Local Outcome Improvement Plan.   
2. RECOMMENDATION 
2.1   It is recommended that the Board: 
i. Notes the concept and model for the NHS as a Population
Health Organisation as set out in Appendix 1; 
ii. Notes NHS Grampian 2026/27 Priorities for Delivery for the
period 1 April 2026 to 31 March 2027 as set out in Appendix 2;   
iii. Notes the alignment between IJB and NHS Grampian strategic
priorities and the commitment to continue improving how we
work as a whole system; 
iv. Notes the proposed actions during 26/27 particularly in
relation to domains 1, 2 and 4, where these include working
with Community Planning Partnerships, North East Population
Health Alliance and the Aberdeen Health Determinants
Research Collaborative; and 
Item 3.
Page 13

Page 14

v. Considers working through the maturity matrix assessment
(once it is published) in relation to domains 1, 2 and 4:
Understanding the needs of the population, System focused
and collaborative, and Prevention and tackling social
determinants, to understand our baseline position, how we
can strengthen partnership working in relation to taking a
whole system approach for community planning, but also to
support a firm foundation for the basis of our development of a
new Local Outcome Improvement Plan for Moray.  
3. BACKGROUND 
3.1  The NHS sector guidance that accompanies the Population Health
Framework makes reference to the NHS as a population health
organisation. This reflects the need for the NHS in Scotland, as part of
the renewal process, to understand itself differently from a treatment
focused organisation to one centred on population health, working
collaboratively to prevent ill health and reduce inequalities while
delivering sustainable, value-based, health and care. 
3.2 Becoming a Population Health Organisation means working in
partnership to improve the health and wellbeing of the whole
population, tackling health inequalities, and delivering value based,
sustainable health and care. There are six key components to becoming
a population health organisation, and these map to the five principles of
the health and social care service renewal framework of prevention,
people, care, community, population and digital (see Appendix 1:
accompanying COSLA paper for detail).   
3.3 As shown in Appendix 2, progressing towards becoming a Population
Health Organisation is one of the actions aligned with the strategic
priority of prevention. In Appendix 3, we have started to explore the
actions we would need to take to support progress towards becoming a
population health organisation. This includes alignment with work that
is already being progressed through the North East Population Health
Alliance and with the Aberdeen Health Determinants Research
Collaboration, particularly in domain 1 – Know your population. It also
has a key focus on strengthening working with Community Planning
Partnerships through domain 2 – system focussed and collaborative.
Prevention and tackling social determinants is also central to the
purpose of Community Planning Partnerships. 
4. NEXT STEPS 
4.1  A maturity matrix is being developed by Public Health Scotland and the
King’s Fund to support Boards to assess baseline positions and
progress towards becoming a Population Health Organisation.  The
Page 14

Page 15

component relating to ‘system focussed and collaborative’ can
potentially be considered by the Community Planning Board as a
partnership exercise to inform strengthening how we work together. 
5. CONCLUSION 
5.1. The Moray Community Planning Board is asked to review and agree the
recommendations noted at 2.1. 
Author of Report: Professor Shantini Paranjothy, Director of Public
Health, NHS Grampian 
Background Papers: Appendix 1: COSLA paper - The NHS as a Population
Health Organisation 
Appendix 2: NHS Grampian 2026-27 Priorities for
Delivery
07.02appendix3nhsgrampianorganisationalpriorities
202627.pdf 
Appendix 3: NHSG as a PHO summary tables     
Page 15

Page 16

No embedded text on this page.

Page 17

1 
s
The NHS as a Population Health Organisation 
This paper is for NHS Boards and can be shared with leaders in the wider system.  It may
also be of interest to Health and Social Care Partnerships. The purpose is to support the
development of the NHS as a Population Health Organisation by:
• Creating a shared understanding of the concept and how it relates to delivery of both the
Population Health Framework, Service Renewal Framework and wider reform
• Being clear on the actions required. 
Background 
The NHS plays a key role in Scotland’s population health system, working with local
authorities, HSCPs, CPPs, and community groups to provide accessible, equitable,
value-based care. In addition to delivering healthcare, NHS organisations play an
important anchor role in communities as an employer, commissioner and procurer of
services. 
To improve overall health, the NHS must shift from treatment-focused services to a
collaborative, prevention-oriented approach that reduces inequalities and delivers
value-based care. This means evolving into a Population Health Organisation. 
Why change 
The Population Health Framework (PHF), Health and Social Care Service Renewal
Framework (SRF), and Public Service Reform Strategy (PSR) all call for an
increased focus on prevention and the redesign of governance and accountability
structures The PHF is clear that the NHS needs to shift from a focus on treatment-
focused care to a population health model. 
We are seeing a rise in the prevalence of long-term conditions and multi morbidity,
along with an increasing gap between our least and most deprived communities. If
we are to create a Scotland where people live longer, healthier more fulfilling lives
and have a sustainable health service, we need to rebalance our health and care
system. 
This means working together to prevent illness, reduce inequalities, and provide
sustainable, value-based health and care—transforming the NHS into a Population
Health Organisation. 
Page 17

Page 18

2 
Delivering the areas of improvement outlined below will shift the NHS to become a
population health organisation focused on improving outcomes and delivering
consistently against the shared reform ambition. It will enable the NHS to build the
capabilities and ways of working in line with the population health framework, service
renewal framework and wider reform to: 
• Prevention-Focused System
Shift health and social care towards prevention and early intervention,
embedding accountability for outcomes across governance, planning, and
resource allocation. 
• Social and Economic Factors
Tackle the root causes of health inequalities by addressing poverty, education,
employment, and housing, while fostering community wealth building and
inclusive economic growth. 
• Places and Communities
Create sustainable, health-enabling environments by integrating services
locally, strengthening community planning and role of place. 
• Enabling Healthy Living
Shape environments and services that support communities to lead healthier
choices. 
• Equitable Health and Care
Deliver person-centred, value-based care focused on outcomes and grounded
in realistic medicine, ensuring fair access and collaboration with communities. 
NHS Boards as population health organisations will increasingly strengthen their role
as anchor institutions and population health leaders, working in partnership with
Local Government, Community Planning, HSCPs and communities to deliver
systemic change. 
This document sets out areas to support Health Boards and IJBs make the changes
required to make this shift to become a Population Health Organisation. 
Becoming a Population Health Organisation 
Becoming a Population Health Organisation requires embedding a focus on
prevention and a reduction in inequalities in all that we do from our approach to
leadership and strategic partnerships, across finance, planning and performance, to
our use of data and digital technologies. 
Page 18

Page 19

3 
It means working in partnership to improve the health and wellbeing of the whole
population, achieving health equity, and delivering value based, sustainable health
and care. There are six key components to this approach as outlined below: 
These components complement and are underpinned by the principles for renewal
set out in the SRF, shown in the figure below
Data and Intelligence - Understanding the needs of the population 
The NHS must use data more consistently to better understand our population's
needs and assets. We need to identify the gap between the most and least deprived
areas and target those most at risk. 
Does the NHS Board understand local referral, waiting times and admission
patterns, analysed by key inequalities indicators, are there shared targets for
reducing variation? Can we share data across the system and track why some
patients are missing from services? If not, there's room for improvement. 
Population Health
Organisaiton
Data and
Intelligence -
Understanding the
needs of the
population
Workforce and
Culture - System
Leadership and
collaboration
Leadership,
Governance and
Accountability
Prevention focused
systems - tackling
social
determinants
Service Design and
Delivery - Focus on
Primary and
Community Health
Care
Value-based health
and care
Prevention
Prevention
across the
continuum of
care
People
Care designed
around people
rather than
the ‘system’ or
‘services’
Community
More care in
the
community
rather than a
hospital
focused model
Population
Population
planning,
rather than
along
boundaries
Digital
Reflecting
societal
expectations
and system
needs
Page 19

Page 20

4 
PHO Actions: 
To understand the needs of the population means building a shared, evidence-
informed picture. This requires the NHS to develop its data and intelligence
capabilities to determine how it can deliver improvements in: 
• Identify health and wellbeing needs by understanding variations and recognising
upstream determinants such as poverty, housing, education, employment, and
environmental factors. 
• Analyse and interpret patterns, trends, and risks, including both current and future
projections, with a particular focus on inequalities.
• Ensure that the lived experiences of individuals and the voice of the community
are central to planning and decision-making processes, complementing data and
intelligence.
• Collaborate with Community Planning partners and the wider health and social
care sector to enhance data integration and sharing, optimise the use of data and
intelligence in local service planning and delivery, and promote effective
collaboration and coordinated action. 
Workforce and Culture - System Leadership and collaboration 
The NHS needs to understand itself as more than a set of services (primary care, OP
clinics, secondary care) to a player in the whole system; not only looking at the
individual who attends for care but the health of the whole population. 
Working together is essential to tackle challenges that cannot be solved by one
organisation, sector, or community alone to improve the health of the population and
tackle inequalities. The Edinburgh Future’s Institute, a partner in the Scottish
Prevention Hub, suggests the following are key to collaborative leadership. 
Page 20

Page 21

5 
As a Population Health Organisation, the NHS has a system leadership role to play in
the local population health system and through health care planning, regional and
national collaborations to optimise health care provision for the population. 
System collaboration is complex; we need to pay attention to collaborative leadership
in practice and enablers of system change. In doing so, we will build capability and
capacity for this work which will require a change in the culture of services in the
NHS. In other words, creating the conditions for change. 
PHO Actions: 
• Strengthen collaborative leadership among senior leaders and Community
Planning Partnerships by embedding the Prevention Hub’s ten system
enablers—such as shared purpose, distributed leadership, and open
dialogue—to establish environments that support change and empower local
teams to champion prevention-focused initiatives. 
• Equip leaders with the capabilities to engage effectively with diverse partners,
fostering system working through appreciation of differences, reciprocal
learning, trust-building, and leadership behaviours that promote alignment
across organisations and sectors. 
Page 21

Page 22

6 
• Co-design healthcare services with stakeholders, ensuring they are tailored to
the needs of specific groups and disease conditions. Integrate care models
through collaborative planning and data sharing, to support a comprehensive,
whole-system approach to service redesign and prioritise a shift towards
prevention. 
• Develop the skills and competencies of Health and Social Care staff through
continuous learning, partnership working, and reflective practice so staff can
drive organisational improvement, fulfil strategic ambitions, and deliver
improved outcomes in prevention, health enhancement, and value-based
care. 
Leadership, Governance and Accountability 
‘Clinical governance’ is the term used to cover corporate responsibility for health care
quality and outcomes. ‘Health governance’ is the term used to cover the contribution
of the whole health economy to improving the population’s health. NHS Board
agendas should have an appropriate balance of health improvement including the
strategic management of health care services for health gain. 
PHO Actions: 
• Establish clear accountability mechanisms for population health outcomes by
developing and implementing metrics for prevention, equity, and value-based
results, accompanied by key performance indicators. These should align with both
the population health framework and the service renewal framework as integral
elements of core governance. 
• Integrate prevention into NHS board strategies and governance structures,
ensuring transparent reporting of progress and leveraging insights for ongoing
improvement. Strategic objectives should explicitly address prevention, and all
committees and subgroups should evaluate not only organisational performance
but also population-level outcomes. 
• Adopt evidence-based decision-making, utilising local insights and impact
assessments to guide resource allocation. The prioritisation process should
leverage the new NSS prioritisation framework, which incorporates principles
regarding the impact on health inequalities and early intervention. 
• Ensure that preventative expenditure is appropriately weighted in policy
development to drive the necessary shift in public policy and outcomes, with a
commitment to increasing the proportion of spending directed towards prevention. 
• Maintain outward accountability to other organisations and communities by
collaborating with local authorities and community planning partners. Align efforts
to address health, inequality, and prevention through joint approaches to
governance, funding, and accountability. 
Page 22

Page 23

7 
Prevention focused systems - tackling social determinants 
The strength in having a prevention-focussed system is in the activity we can deliver
in partnership. To embed prevention within our system we must consider what we are
trying to prevent and where the levers are to act on this. 
For example, Local Authorities have more influence over the determinants of health
and Health Boards have more influence on minimising the harms following disease
diagnosis. As a PHO it will shift more towards stopping illness from arising or
worsening. 
The following figure provides a framework for embedding prevention in health and
care services for Health Boards and IJBs to adapt and use. 
Those who are most adversely affected by poorer health outcomes are those who
can benefit the most from preventative action. By acting on health inequalities we will
in turn be taking preventative action. 
PHO Actions: 
• Integrate prevention within decision-making processes throughout the
organisation. Take deliberate, targeted action to embed prevention opportunities
into services already provided and across all interactions with partners, public
and staff. 
• Enable health and social care staff to actively participate in and benefit from
prevention initiatives—thereby positioning the NHS not only as a Public Health
Organisation (PHO), but also as a central hub for prevention for staff, patients,
partners, and visitors. 
• Enhance the NHS’s Anchors and Community Wealth Building efforts, income
maximisation services, and influence on socio-economic environments, while
Page 23

Page 24

8 
working to minimise environmental impacts and foster healthy living
environments. 
• Systematically evaluate, identify, and address healthcare inequities across all
services, including consideration of alternative models of care. Ensure equitable
access and deliver culturally competent services focused on populations at
highest risk of adverse outcomes. 
Service Design and Delivery – Shift to Primary and Community Health Care 
Health systems with strong primary care are better for population health – they have
better outcomes, are more equitable, and are more cost effective. Increasing
specialisation drives more procedures and interventions while generalist care can
hold more in the community and reduce costs through management without specialist
intervention. 
PHO Actions: 
• Funding, workforce, and performance policies are aligned with the goal of shifting
the health and care system’s focus toward primary and community health and
care. 
• Resources are being reallocated to support community-based, preventative
models, with particular attention to individuals with significant needs, for example,
through proportionate universalism. 
• Efforts are being made to improve continuity of care by collaborating with HSCPs,
CPPs, local authorities, and communities to facilitate anticipatory care and
integrated care pathways. 
• Service delivery is moving toward joint commissioning, involving co-design and
co-delivery of services with communities to ensure they address local needs
effectively. 
Value-based health and care 
Value-based health and care is an approach to health care that leads the
organisation to increase the value from health service activity and is essential to
optimise the health of the population from a limited resource.  
Page 24

Page 25

9 
PHO Actions: 
• Implement Realistic Medicine principles to facilitate shared decision-making and
stewardship, enabling individuals to actively participate as partners in their own
healthcare. 
• Collaborate with clinicians to promote responsible resource management,
ensuring accountability for resource utilisation and balancing individual care with
population health needs. 
• Identify and address unwarranted variations in outcomes, access, and quality of
care. 
• Establish an outcomes-focused approach to clinical practice that supports
comprehensive assessment of the value delivered by interventions. 
• Demonstrate measurable progress in organisational efforts to disinvest from low-
value interventions and reduce unnecessary waste. 
• Allocate resources for digital solutions in population health management and
ensure that digital opportunities to enhance health outcomes are fully leveraged. 
Page 25

Page 26

No embedded text on this page.

Page 27

Page 27

Page 28

Page 28

Page 29

Page 29

Page 30

Page 30

Page 31

Page 31

Page 32

Page 32

Page 33

Page 33

Page 34

Page 34

Page 35

Page 35

Page 36

Page 36

Page 37

Page 37

Page 38

Page 38

Page 39

Page 39

Page 40

Page 40

Page 41

1. Understanding the needs of the Population 
What this means: We have a shared, evidence-informed picture of the population’s health and wellbeing needs, including an understanding of the
upstream determinants (e.g. poverty, housing, education, employment, environment), how this leads to variation in health outcomes e.g. healthy life
expectancy, current trends and future predictions (including inequalities), people’s lived experience and the communities’ voice, how health and the
wider system are working together and what more can be done.
Current position (where are we) Activity (to progress towards achieving our aims)  Aims (where we want to be)
Wealth of data but in sector based
silos 
Joint Strategic Needs Assessments
(JSNA) are done but no standardised
approach so not joined up for planning 
Grampian work completed to date
(Oct ’25) informs development of
performance indicators for the
Population Health Framework 
North East Population Health Alliance
–working to progress with taking a
whole system approach to improve
our data maturity 
Key actions for 2026/27
1. Socialise / promote JSNA resource to support planning of services
based on population need (three priority areas to be identified) 
2. Improve data maturity and sharing 
- NEPHA working group – focus on application to healthy weight /
substance use
- Data maturity assessment 
3. Support Unscheduled Care and Planned Care Programmes to use
population health data in service planning through the refreshed
Population Health Portfolio Board 
Medium / longer term actions (27/30)
Scope and progress development of a population health platform 
How it makes a difference 
Planning is informed by population need and the population in Grampian
receive proportionate support to ensure equitable access 
Indicators of success: Case studies to demonstrate:
- Use of JSNAs & population health data in service planning 
- How are services currently meeting needs / outcomes / inequalities  
All key stakeholders use
JSNAs to inform joint
planning/redesign of key
pathways and services. 
Whole system pathways of
care and services are
equitable & responsive to
population need to enable
right care, place, time and
appropriate person. 
Service planning is
undertaken at a population
level, informed by shared
understand of needs and
assets of the population.
Page 41

Page 42

2. System focused and collaborative 
What this means: Working together is essential to tackle challenges that cannot be solved by one organisation, sector or community alone to
improve the health of the population and tackle inequalities. NHS Grampian has a system leadership role to play in the local population health
system and through health care planning, regional and national collaborations to optimise health care provision for the population. 
Current position (where are we) Activity (to progress towards achieving our aims)  Aims (where we want to be) 
KPMG diagnostic review
highlighted
- Disconnect from partners 
- Acute focus only 
- Need more shared planning
& budgeting 
Through Community Planning we
have a focus on 
- Prevention and early
intervention 
- Tackling child poverty 
- Whole system approach to
healthy weight 
- Address social
determinants through
Anchor / community wealth
building 
Through Putting People First we
strengthen our engagement with
staff and the public 
Key actions for 2026/27
1. Maximise NHSG’s voice in new sub-national arrangements 
2. Delivery Grampian’s contribution to Scotland East plan – USC,
orthopaedics, business systems & digital front door 
3. Improve stakeholder relationships - Councils, SAS, HIS, NES
4. Deliver statutory duty on child poverty with local authorities 
5. More integrated service and financial planning 
6. North East Transformation Group work in 2026/27
7. Strengthen collaborative leadership with Community Planning
Partnerships so conditions for change in place for empowered teams
8. Continue to implement Putting People First approaches  - use  lived
experience and other relational approaches to public involvement,
implement real-time feedback across the organisation  
Medium / longer term target 
- Population segmentation to develop services with collaborative clinical
networks for whole system 
- Strengthen relationships with third sector to deliver preventative
models of care 
How it makes a difference 
Examples – National Mission on Drugs and Human Learning System & Child
Poverty Plan 
Indicators of success 
Incidence of drug & alcohol related deaths & children living in relative poverty 
Collaborative leadership in
place to create the
conditions for change and
address challenges (silo
working, inflexible
structures, leadership
tensions, technology / data
security, effective use of
evaluation) 
Hear range of voices & truly
listen 
Align locally, regionally &
nationally 
Place based care in place 
Recognise  / value our
partners 
Earn trust 
Page 42

Page 43

3. Governance and Accountability 
What this means: As a Population Health Organisation, Board agendas should have an appropriate balance of health improvement including the
strategic management of health care services for health gain
Current position (where are we) Activity (to progress towards achieving our aims)  Aims (where we want to be)
Strategic intent stated in Plan for the
Future, ambitions of Population Health
Framework and Service Renewal
Framework – create sustainable,
preventative system of health and care 
Population Health Committee agreed
lead executives to set out the
organisational shift required to become
a Population Health Organisation 
Population Health Programme Board
refreshed to provide oversight of
progress as a population health
organisation 
Key actions for 2026/27
1. Refresh and update Plan for the Future 
2. Formal agreement from NHSG Board as a strategic objective 
3. All committees and subgroups to consider population outcomes
alongside performance 
4. Board self-assessment exercise to inform areas for development 
5. Population health organisation KPIs as part of core governance 
6. Integrated Impact Assessments applied to all policy, service
redesign and development initiative across organisation   
Medium / longer term target 
- Quality assess use of Integrated Impact Assessments 
- Develop Board workplan based on self-assessment exercise 
How it makes a difference 
Equitable access to care evident through performance metrics 
Indicators of success 
Integrated Impact Assessment completion rates and quality assurance 
Progress towards delivering
plan for the future and
function as PHO 
Equitable access to health 
and care services evidenced
through performance
metrics 
Page 43

Page 44

4. Prevention and tackling social determinants 
What this means: As a PHO NHS Grampian will shift more towards stopping illness from arising or worsening. Those who are most adversely
affected by poorer health outcomes are those who can benefit the most from preventative action. By acting on health inequalities we will in turn be
taking preventative action.
Current position (where are we) Activity (to progress towards achieving our aims)  Aims (where we want to be)
Progressing with implementing the
framework for embedding
prevention in health and care
services with a focus on
cardiovascular disease (CVD). 
Working with partners and Acute,
HSCPs & CPPs to develop/deliver
- Resources to support GPs to
maximise uptake of early
detection and treatment of
risk factors for CVD
- Pathway for smoking
cessation in maternity
services 
- Pathway for anti-obesity
medication 
- Delivery of Anchor plans
- Whole system approach to
health weight environments
- National T2 Diabetes weight
management programme
- Whole system approach to
Community Appointment
Key actions for 2026/27
1. Engage with Area Clinical Forum & Area Partnership Forum on approach to
embedding prevention 
2. Complete Strategic Needs assessment for CVD
3. Deliver on potential as Anchor organisation 
4. Strategic whole system approach to priority areas 
5. Implement digital population health interventions 
6. Optimise implementation of interventions to prevent CVD
7. Reduce inequalities in access and uptake of preventative services 
8. Prevent and reduce infectious and communicable diseases 
Medium / longer term target 
- Ensure income maximisation available in healthcare settings
- Poverty proofing access to healthcare services 
- Strengthen relationships to deliver preventative models of care
- Meet legislative requirement to delivery net zero carbon services 
- Climate resilience and collaboration 
How it makes a difference 
Examples – promoting equity of access to healthcare, reduced rates of CVD,
improved maternal mental health and infant outcomes, fewer people living with
BBVs, reduced rates of drug and alcohol related death.
Indicators of success 
- Anchor metrics 
- Rates of childhood obesity
- Incidence of BBV infections 
Move from reactive state to
focus on stopping illness
arising/worsening 
Environments that
encourage promoting health
and wellbeing 
Prevention of conditions
forecast to create high
burden of care and
increased demand for
services 
Healthy aging and person
centered care 
Optimised opportunities for
prevention, early
intervention & technology
Page 44

Page 45

Days in Aberdeenshire,
Aberdeen City
- Incidence of suspected drug related death / alcohol related hospital
admissions and deaths
- Referrals from planned care services to smoking cessation, and adult
weight management 
- Uptake of screening and vaccination programmes 
Page 45

Page 46

5. Focus on Primary and Community Health Care 
What this means: Health systems with strong primary care are better for population health – they have better outcomes, are more equitable, and
are more cost effective.
Current position (where are we) Activity (to progress towards achieving our aims)  Aims (where we want to be)
GP vision work – population
health workstream not being
progressed due to lack of
capacity/resource in system 
Working to establish a Primary
Care Board in Grampian 
Once for Grampian strategic
approach for primary care 
Strengthen links between NHSG
Board and three HSCPs 
Suite of tools and models to
deliver transformational service
change 
Key actions for 2026/27
1. Progress set up Primary Care Board 
2. Support service redesign to shift the balance of care to the community 
3. Enhance access to NHS Dentistry and oral health programmes for children 
4. Support women to make informed reproductive choices 
5. Reduce repeat ED attendance by helping high intensity users access care
and services in the community 
6. Redesign urgent and emergency pathway to address long waits, corridor
care and boarding 
7. Participate nationally commissioned work relating to redesign of hospital
care, shifting the balance of care & digital transformation 
Medium / longer term target 
- Explore development of pooled budgeting enabling right care in the right
place 
- Systematically assess, identify and address healthcare inequalities in all
services 
How it makes a difference 
Examples – improved mental wellbeing, create healthy places, early detection
& management of conditions, reduce pressure on acute services, best possible
start in life for all children, reduce risk of chronic oral disease 
Indicators of success 
Reduction in rates of abortion 
Reduction in number of HIU at ED
Deliver more care, services
and support closer to home 
Use community led health
approaches and strengthen
place based working 
Page 46

Page 47

Rates of breast feeding by SIMD 
% of primary 1 / primary 7 children with no tooth decay 
6. Value-based health and care 
Current position (where are we) Activity (how we got here) Aims (where we want to be)
Realistic medicine / value based
health and care programme in
place with good examples of
learning from projects 
Putting People First programme in
place, which embeds GIRFE 
Work needed to support
systematic adoption of realistic
medicine, value-based health and
care and GIRFE 
Key actions for 2026/27
1. Deliver more care, services and support closer to home.
2. Shift investment into the development of community-based services
and alternatives to hospitalisation 
3. Develop the HOPE Collaborative for a system-wide unified approach to
Putting People First, GIRFE and realistic medicine
4. Working with clinicians to be responsible for resources balancing
personal and population based care 
5. Addressing variation in outcomes, access and quality 
6. Optimising digital opportunities 
Medium / longer term target 
7. Develop outcomes-based approach to clinical care 
8. Disinvesting in lower value interventions and decrease waste 
9. Meet legislative requirement to deliver net zero carbon service 
How it makes a difference 
Examples – sustainable service and minimize climate impact, increase civic
engagement, more patient centered, increase community empowerment &
resilience, integrated prevention models, reduced waiting list times for tertiary
services
Indicators of success 
Case studies demonstrating engagement activities with clear links to learning
& outcomes, Implementation of realistic medicine  / value based health and
care / Sustainability plan metrics 
People as partners in their
own care, patients
supported to make informed
decisions about care and
treatment 
Enable staff patients and
public to take a lead role in
how care is delivered 
Ensure safe environment to
deliver effective, efficient
and sustainable care,
supporting staff and patient
wellbeing 
Page 47

Page 48

Page 48

Page 49

REPORT TO: COMMUNITY PLANNING BOARD ON 3 JUNE 2026 
SUBJECT:  GETTING IT RIGHT FOR EVERYONE 
BY: IAIN MACDONALD, DEPUTY HEAD OF SERVICE, HEALTH AND
SOCIAL CARE MORAY 
1. REASON FOR REPORT 
1.1 This report seeks to provide the Community Planning Partnership with an update
on the national Getting it Right for Everyone (GIRFE) work and its implementation
in Moray 
2. RECOMMENDATION 
2.1. It is recommended that the Community Planning Board: 
i. Consider and note the content of the report on GIRFE; 
ii. Endorse the collaborative approach being taken to align GIRFEC (Getting it
Right for Every Child) with GIRFE; 
iii. Endorse the collaborative approach being taken to align GIRFE within a
wider whole system approach; linking key themes such as Putting People
First, Realistic Medicine, Frailty, Unscheduled Care, and Population
Health; and 
iv. Note Morays involvement in a Grampian wide approach to embed the
GIRFE principles and share good practice 
3. BACKGROUND 
3.1 In 2006, the Getting it Right for Every Child (GIRFEC) Implementation Plan for
Scotland was published. The plan offered a commitment to provide all children,
young people and their families with the right support at the right time, so that
every child and young person in Scotland could reach their full potential. 
Item 4.
Page 49

Page 50

3.2 The co-design of GIRFE commenced in December 2022 in response to the
recommendation from the Derek Feeley Report ‘The Independent Review of Adult
Social Care’, supported by the Joint Statement of Intent and Next Steps for Adult
Social Care 2022-23. GIRFE aligns with the Framework for Health and
Community Care and builds on self-directed support implementation across
Scotland. 
3.3 GIRFE is a multi-agency approach to health and social care support and services
from young adulthood to end of life care. GIRFE builds on existing best practice
and learning from GIRFEC.  GIRFE is part of a programme to improve population
health and wellbeing, reduce health inequalities, create sustainable health and
care services. GIRFE will provide a national practice model to embed inter-
agency working.  GIRFE works in line with the community health and social care
integrated service framework and provides a model to deliver the framework that
supports person centred outcomes. 
3.4 In 2022 the Scottish Government launched their commitment to develop an
implementation plan for GIRFE. A number of Health and Social Care Partnerships
applied to be involved in this programme of work. Aberdeenshire, and Aberdeen
City, Health and Social Care Partnerships were successful and joined the
programme as Pathfinders. In 2023 a further offer was made for other Health and
Social Care Partnerships to join the programme. Health and Social Care Moray
applied and joined as a Partner. 
3.5 Between 2022 and 2024 GIRFE was co-designed by Health and Social Care
Partnership teams, the Scottish Government, and people with lived experience
across Scotland. 
3.6 The objectives of the co-design journey were to:
• Co-design a set of principles for GIRFE
• Understand what a national practice model might look like
• Understand what might be needed for consistent implementation across
Scotland 
3.7 The specific themed areas that were initially explored within the GIRFE
development work were: 
• People in prisons
• People in Alcohol and Drug services
• People registered at ‘deep end’ GP practices (‘deep end’ is a term used to
describe work in general practices serving the 100 most deprived
populations in Scotland)
• Families with multiple and/or complex needs; and young people in
transition from child to adult services
• Older people and frailty 
GIRFE now covers all aspects of adult health and social care and is not limited to
these themes. 
Page 50

Page 51

3.8 The ambition of GIRFE is to place the person at the centre of all decision making,
with a joined up consistent approach, regardless of the support needed at each
stage of their life. 
3.9 The five GIRFE principles are: 
1. I have the information I need to make decisions about my life, in a format
that works for me, and I am supported to understand what options are
available to me, and trusted to know what is right for me.    
2. The people who support me take the time to listen to and understand me
as a person and communicate in a way that works for me. We consider my
whole life when making decisions about my life. 
3. I know that I can be clear about what matters to me, and I trust that my
choices will be respected and taken into account by the people who
support me. 
4. If I need to access services or support, I am treated with kindness, dignity
and respect at all times. 
5. The people I am involved with work together with me and each other to
share relevant information, in a format that is accessible to me, and
develop a clear understanding of how to support my wellbeing.   
3.10 A GIRFE ‘Team Around the Person’ toolkit has been published. The toolkit has not
just been informed by, but crucially, has been collaboratively designed with
people with lived experience who will be impacted directly by embedding GIRFE
within the current health and social care system. This means that people with
lived experience, across Scotland, have actively helped to identify the barriers
that prevent us ‘getting it right for everyone’ and have worked with their local
pathfinder and partner teams to shape the tools detailed within the GIRFE toolkit 
3.11  Further information is available on the Scottish Governments GIRFE web pages:
Getting it right for everyone (GIRFE) - gov.scot 
3.12 The Scottish Government have written to HSCP Chief Officers and NHS Chief
Executives indicating that NHS and HSCP Annual Delivery Plans will require
Boards to set out how they will embed the principles of GIRFE, into the planning
and delivery of their services from 2026 onwards. 
3.13 Within Moray, and Grampian, we recognise there are multiple approaches
already taking place that incorporate aspects of GIRFE. Examples would include
Human Learning Systems, Putting People First, Realistic Medicine, Unscheduled
Care, Population Health, and Frailty Pathways to name but a few. This can be
confusing for both staff and public. We also recognise that resources are limited,
and we are going to be more impactful where we work collaboratively across
aligned agendas.  Health and Social Care Moray, and our neighbouring Health
and Social Care Partnerships in Aberdeen City and Aberdeenshire, will work with
partners and the public to refine these approaches and simplify where possible,
maximising the opportunities these approaches provide in order to drive forward
Page 51

Page 52

service provision.  Health and Social Care Moray will seek to embed the
approaches in the revised Health and Social Care Moray Strategic Delivery Plan
in order to promote an approach across all services that is in line with person led
and outcome focused care for the citizens of Moray. 
4. SUMMARY OF IMPLICATIONS 
4.1. Health and Social Care Moray have a well established GIRFE Delivery Group,
which oversees the embedding, and implementation of GIRFE in Moray. The
group will monitor, evaluate and report on progress via the HSCM Operational
Management Team, Senior Management Team and Moray IJB and Community
Planning Partnership. 
4.2. The following actions will form part of the Moray GIRFE delivery plan: 
1. The promotion of GIRFE to key Moray stakeholder groups including; Moray
IJB members, senior managers, primary and secondary care services,
HSCM partners, third Sector, unpaid carers, and community groups. A
combination of presentations, paper briefs and social media posts as
appropriate. 
2. To develop GIRFE Champions across Moray. 
3. To align GIRFEC, The Promise and GIRFE through focused discussions
on Transitions. 
4. Locality Multi Disciplinary Team’s will benchmark ‘How good are we – at
getting it right for everyone’. 
5. To embed the GIRFE Principles in all relevant new or updated policies. 
6. That the GIRFE ethos and principles are embedded into all new Health and
Social Care Moray commissioned contracts. This will ensure that providers
are aspiring to getting it right for everyone across Moray. Key Performance
Indicators (KPI’s) will be co-designed with providers. 
7. The incorporation of GIRFE in the revised model for Discharge to
Assess/Start with a particular emphasis on My Plan, My Team, Community
Connections and Coordinator. 
8. The incorporation of GIRFE into the Hospital Discharge Team process with a
particular emphasis on My Plan, My Team, Community Connections and
Coordinator. 
9. The incorporation of GIRFE in to the Virtual Ward Model in localities with
particular emphasis on My Plan, My Team, Community Connections and
Coordinator. 
Page 52

Page 53

10. To develop the Community Connector role to ensure that people have an
opportunity to speak to practitioners about ‘what matters to me’
conversations and that they are sign posted to appropriate community
opportunities/services.   
11. To ensure GIRFE is embedded into the digital transformation work being
facilitated by DHI. In particular to develop a Community Connector Digital
Resource – Community Connections Moray.
https://communityconnect.scot/ 
12. To develop specific Moray resources to promote GIRFE such as GIRFE on a
Page, GIRFE Videos, GIRFE Quizs, staff and public comms. 
13. Health and Social Care Moray to work closely with colleagues in Aberdeen
City and Aberdeenshire to ensure consistency of implementation and
maximisation of available resources. The work currently taking place within
Grampian has received accolades at a national level. 
5. CONCLUSION 
5.1. That the Community Planning Partnership note the content of the report and
endorse and support the roll out of the GIRFE programme within Moray. 
Author of Report:  Iain Macdonald, Deputy Head Of Service, Health And Social
Care Moray  
Background Papers:  
Ref: 
Page 53

Page 54

Page 54

Page 55

REPORT TO: COMMUNITY PLANNING BOARD 3 JUNE 2026 
SUBJECT: MULTI-AGENCY WORK TO SUPPORT YOUNG PEOPLE 
BY: DAWN PARKER   
1. REASON FOR REPORT 
1.1. To update Community Planning Board members on the ongoing work,
initially in two areas of Moray, Buckie and Elgin South to support young
people and their families given the rise in behavioural concerns including
use of alcohol and substance use. 
2. RECOMMENDATION 
2.1. The Community Planning Board is invited to: 
i. note the progress of multi-agency work in Buckie and Elgin South; 
ii. endorse the emerging strategic direction; and agree to formally
authorise and enable the workforce to actively participate in the next
phase of activity; and 
iii. Agree that a further update is brought back to the Community
Planning Board within 6–12 months to demonstrate progress and
impact; 
3. BACKGROUND 
3.1. It has been evident through various governance groups including
Children’s Services Planning Partnership (CSPP) formerly Girfec
Leadership Group (GLG), Community Safety Strategy Group (CSSG) and
various sub groups that young people’s behaviour has been of concern
particularly in the Buckie area and also in Elgin South.  
Item 5.
Page 55

Page 56

3.2. Various initiatives have been put in place including additional youth
workers with all Community Planning and Third Sector partners involved. 
3.3. In November 2025, as reported to the Education, Children’s and Leisure
Services Committee of the Council the Education Service brought
forward a paper with options for spend of funding to support Additional
Support Needs additional monies as provided by Scottish Government. 
The Education service had completed a comprehensive review of
Additional Support Needs locally and as part of this work had created a
vision for the service moving forwards as well as the creation of Flexible
Learning Resources for Primary (Central Elgin and outreach for Moray
East and West) where teams work with schools to support additional
support needs strategies including those children who are demonstrating
behavioural needs for a number of reasons.  The service has also invested
in a wide range of training to support inclusive practice which continues
to be reviewed and updated on an annual basis to ensure that staff have
the necessary skills, expertise and strategies to support a growing range
of needs. 
3.4. At that time 2 proposals were agreed: to recruit and allocate 8 full time
equivalent (FTE) early level support workers to work across early level in
an early intervention capacity to support children and families who
require additional support in Primary 1 through transition and beyond;
and creation of a secondary outreach team within the management of the
Head Teacher Inclusion, Wellbeing and Adapted Curriculum to support
schools where there are issues linked to behaviour and in school non-
attendance where learning experiences are reduced and outcomes not
maximised. This outreach team would work closely with identified
schools (Buckie High and Elgin High) in the first instance as well as
Pinefield Parc educational provision. 
3.5. At the same time the Head of Education, put a proposal to the then GLG
to request multi-agency support for the Secondary Outreach Team given
the budget position with out of area placements which were increasing,
creating a budget pressure for the Council and the Integrated Joint Board. 
It was considered that any financial or workforce support to this team
from Health, Police Scotland, Social Work and the Third Sector would add
great value to create a multi-agency team to support this work moving
forward adding capacity as well as resource where there was gap in
provision. 
3.6. Around the same time, the Children’s Services GIRFEC/ The Promise
Strategic Lead officer and the Head of Education convened a multi-
agency strategic lead officer meeting which was very productive and
surmised that there was much happening locally however each agency
was working in silos in a reactionary mode although there was a desire to
be much more strategic where the review of the Children’s Services Plan
Page 56

Page 57

would be a key driver to any strategic plan moving forwards. 
3.7. A workshop took place in February 2026 with a wide range of partners to
consider what was available locally to support young people and families
and as a result the attached report in Appendix 1 was drafted by the
GIRFEC/The Promise Lead Officer.  Key points from the information 
collecated include :: 
• strong working relationships
• clear specialist skills
• valuable community assets 
alongside key challenges, including: 
• significant pressure from rising complexity of need
• inconsistent early-help pathways
• workforce limitations
• fragmented processes and data 
3.8. The multi-agency workshop held in February was convened to move
beyond descriptive mapping of services and to establish a shared
strategic understanding of how the current system operates across
Buckie and Elgin High ASGs, and what must change to improve outcomes
for children, young people and families. Strategic outcomes include 
• a shared View of the Local System, 
• Collective Ownership of Early Help, 
• Clearer Pathways and Thresholds
• Strengthened Multi-Agency Coordination, 
• A More Systematic Whole-Family Approach
• Improved Use of Data and Local Intelligence 
3.9. Based on the analysis of workshop content, the system requires: 
1. A single Early Help Pathway with clear thresholds, roles, and a “one front
door” model. 
2. Protected multi-agency structures, including Team Around the School
and Early Help Hubs. 
3. Simplified processes and consistent GIRFEC practice. 
4. Investment in preventative capacity, including youth work, family
support, and counselling.
5. Community-anchored hubs to reduce stigma and improve access.
6. Improved data transparency, shared dashboards, and integrated
intelligence. 
7. Co-design with families to ensure services meet real needs.
Page 57

Page 58

3.10. This activity reflects Moray’s GIRFEC refresh and implementation of the
Promise. A strategic oversight group is essential to direct this activity.
Plans are in place to pull together the original multi-agency group to drive
this work moving forwards. 
4. SUMMARY OF IMPLICATIONS 
4.1. This work is in its early stages however provides a potential way forwards
which will depend on the new Children’s Services Plan to provide the
governance and key actions to progress this work. Importantly, the
emerging approach does not require additional financial resource; rather
it will be delivered through improved alignment, coordination and
redistribution of existing resources across partners to maximise impact
and reduce duplication. 
5. CONCLUSION 
5.1. That the Community Planning Board  is fully aware of and committed to
multi-agency work planned for the Buckie and Elgin South areas, pulling
together the range of ongoing work in one clear plan moving forwards for
the benefit of young people and families. This approach provides a test of
change that, subject to impact, can be scaled to other localities,
contributing to more sustainable, preventative and family‑centred
support across Moray. 
Author of Report: Dawn Parker. GIRFEC/The Promise Strategic Lead
Officer
Vivienne Cross, Head of Education, Chief Education
Officer 
Background Papers:   Multi Agency Support – Report of Workshop Findings
March 2026   
Page 58

Page 59

APPENDIX 1 
Pathway of Support           
Buckie & Elgin High ASGs
Exploring a multi-agency placed based approach Workshop Feedback
Dawn Parker
16/03/2026 
Page 59

Page 60

1 
Contents
1.Background ...................................................................................................... 3
Place Based Approach .......................................................................................... 3
1a Executive Summary ........................................................................................ 4
Key Strengths .................................................................................................. 4
Key Challenges ................................................................................................ 4
Opportunities for System Improvement ........................................................... 4
Conclusion ...................................................................................................... 4
2.Strengths Across the System ............................................................................ 5
2.1 Multi-Agency Capability ................................................................................. 5
2.2 Early Intervention and Prevention .................................................................. 5
2.3 Whole-Family Practice .................................................................................. 5
2.4 Specialist Expertise ....................................................................................... 5
2.5 Data and Intelligence Strengths ..................................................................... 5
3. Challenges and Gaps in the System .................................................................. 6
3.1 Inconsistent Early Help ................................................................................. 6
3.2 Misaligned Processes .................................................................................... 6
3.3 Capacity Constraints ..................................................................................... 6
3.4 Data Fragmentation ....................................................................................... 6
4. Opportunities for System Development ............................................................ 6
Build a Coordinated Early Help Pathway .......................................................... 6
Using existing resources more coherently (Youth Work, Health Improvement,
Arrows, Aberlour, Pathways, School Nurses). ...................................................... 6
Strengthen Shared Language and Communication .......................................... 6
Improve Cross-Agency Data Integration .......................................................... 6
Develop Systematic Whole-Family Support ..................................................... 6
Expand Youth and Family Spaces .................................................................... 6
5. Detailed Service Overviews .............................................................................. 7
5.1 Buckie High ASG – Overview .......................................................................... 7
Key Strengths .................................................................................................. 7
Page 60

Page 61

2 
Key Issues ....................................................................................................... 7
5.2 Elgin High ASG – Overview ............................................................................. 7
Landscape Summary ....................................................................................... 7
Key Strengths .................................................................................................. 7
Key Challenges ................................................................................................ 7
6. Patterns Across the System ............................................................................. 8
6.1 Rising Complexity of Need ............................................................................. 8
6.2 Pressure on Schools ...................................................................................... 8
6.3 Disconnection ............................................................................................... 8
7. Barriers to Effective Delivery ............................................................................ 8
7.1 Structural Barriers ......................................................................................... 8
7.2 Workforce Pressures ..................................................................................... 8
7.3 Operational Issues ........................................................................................ 9
7.4 Data Limitations ............................................................................................ 9
7.5 Community and Family Barriers ..................................................................... 9
8. Impact of Current Work ................................................................................... 9
Wellbeing & Mental Health .............................................................................. 9
Relationships & Trust....................................................................................... 9
Family Support ................................................................................................ 9
Education & Engagement ................................................................................. 9
Skills & Employability .................................................................................... 10
Community Safety ......................................................................................... 10
9. Strategic Recommendations .......................................................................... 10
10. Early Help Pathway (summary) ..................................................................... 10
11. Appendices ................................................................................................. 11
Appendix 1:  Pathway of Support Table .............................................................. 11
Appendix 2:  Other Thoughts from Workshop Participants ................................. 13
Appendix 3:  Draft Early Help Pathway for Buckie and Elgin High ASG areas ....... 14 
Page 61

Page 62

3 
1.Background 
On Monday 24 February 2026, thirty practitioners from across Moray’s statutory and
third-sector services came together for a one-off multi-agency workshop. The session
was designed to map the full range of support and activity available to children, young
people and families within the Buckie and Elgin High Associated School Groups. 
The workshop brought together representatives from education, social work, NHS
Grampian, Police Scotland, youth work and community learning, public health,
community safety, housing, employability, and a range of third-sector partners. This
breadth of participation reflects the depth of commitment across Moray to strengthening
our collective response and ensuring families experience a coordinated and accessible
system of help.
The purpose of the session was to establish a clear, shared picture of current provision
across Moray’s Children’s Services Partnership—from universal supports to more
targeted and commissioned interventions. By bringing professional knowledge, local
insight and lived operational experience into one space, the workshop aimed to identify
strengths, gaps, and opportunities for improvement across the wider system.
This work forms an important foundation for Moray’s ongoing GIRFEC and The Promise
commitments. A clearer understanding of what is available, how services connect, and
where barriers exist will support the development of stronger early-help pathways, more
effective multi-agency coordination, and more consistent access to the right support at
the right time.
The contributions of all participants were central to generating an accurate and
comprehensive overview of the current landscape. The reflections and data shared
during the session directly inform the findings and recommendations set out in this
report.
Place Based Approach 
A place-based focus also allowed partners to map supports across the whole local
ecosystem—education, health, youth work, social work, community organisations,
policing, housing, employability and the voluntary sector. By doing so, the workshop was
able to identify not only the range of services available, but how they interact, how
accessible they are, and how well they collectively respond to the specific needs of
Buckie and Elgin communities.
This approach supports a more connected system, one that strengthens local
relationships and promotes collaborative problem-solving. It enables practitioners to
design responses that are tailored, proportionate and meaningful for the families they
serve. Ultimately, the place-based methodology provides a strong foundation for the
development of locality-driven Early Help pathways that reflect the strengths, complexity
and individuality of Buckie and Elgin High ASG areas. 
Page 62

Page 63

4 
1a Executive Summary
Multi-agency feedback across the Buckie and Elgin High ASGs demonstrates a system
rich in commitment, expertise, and community assets. However, practitioners
consistently describe a landscape constrained by capacity pressures, fragmented
processes, rising complexity of need, and inconsistent early-help pathways. The findings
point to strong foundations on which to build a more coherent, preventative,
family-centred system aligned with GIRFEC and The Promise.
Key Strengths
• Strong multi-agency relationships across Education, Social Work, Health, Police,
CAMHS, Youth Work, Third Sector and Employability services.
• Widespread trauma-informed and relational practice.
• Deep specialist expertise (mental health, safeguarding, employability,
community work, family support).
• Significant community assets including youth spaces, hubs, volunteers, and
flexible third-sector supports.
• Clear evidence that early intervention—where available—improves wellbeing,
family stability, engagement, and safety.
Key Challenges
• Rising complexity of need: anxiety, EBSA, substance misuse (ketamine),
antisocial behaviour, family stress, parental mental health, neurodiversity.
• Workforce strain across Social Work, CAMHS, counselling, youth work and
school-based supports.
• Fragmented pathways, unclear thresholds, inconsistent GIRFEC practice.
• Schools acting as the “only open door”, holding disproportionate responsibility.
• Space constraints, transport barriers, and short-term funding cycles.
• Data held in silos, limiting early identification and coordinated planning. 
Opportunities for System Improvement
1. Develop a coordinated Early Help Pathway with shared thresholds and a single
“front door”.
2. Strengthen multi-agency structures and protected planning time.
3. Improve data visibility and integration.
4. Build consistent whole-family approaches.
5. Expand relational early-intervention spaces for young people and families.
6. Invest in workforce development across trauma, neurodiversity, adolescent
safeguarding, and GIRFEC practice.
Conclusion
The ASGs have strong relationships, skilled practitioners, and committed partners. With
clearer structures, better coordination, and a shift toward prevention, the system can
significantly improve outcomes for children, young people, and families.
Page 63

Page 64

5 
2.Strengths Across the System
2.1 Multi-Agency Capability
Across agencies, there is a shared commitment to working collaboratively:
• Effective partnerships between Police, Social Work, CAMHS, CLD, Education,
and Health Improvement.
• Strong community knowledge and contextual awareness in Education, Social
Work and Housing.
• Consistent trauma-informed and relational practice was identified across
Education, Aberlour, Police and Social Work.
2.2 Early Intervention and Prevention
Services evidence preventative approaches:
• Youth Work universal and targeted offers.
• Moray Pathways mentoring and keyworker supports.
• Health Improvement prevention work around health, wellbeing, and sexual
health.
• School nursing drop-ins and accessible referral routes.
2.3 Whole-Family Practice
Several agencies prioritise family-centred support:
• Arrows: whole-family intervention, harm reduction, parental support.
• Aberlour: trauma-informed family support. 
• Housing: deep understanding of household environment.
• Children 1st: emotional, financial, and parenting programmes.
2.4 Specialist Expertise
Significant skills exist across:
• CAMHS (formulation and therapeutic work).
• Educational Psychology (assessment, training, consultation).
• Police (CARM, risk reduction, trauma-informed approaches).
• Employability teams (barriers to work, groupwork, targeted 15+ support).
2.5 Data and Intelligence Strengths
• Education: attainment, wellbeing, and community data.
• Social Work: referral trends, crisis indicators, IRD learning.
• Police: extensive intelligence systems.
This provides a foundation for enhanced joint planning if better integrated.
Page 64

Page 65

6 
3. Challenges and Gaps in the System
3.1 Inconsistent Early Help
• Social Work reports of missed early intervention opportunities and increased
crisis referrals.
• Youth Work seeks clearer language and structured role clarity.
3.2 Misaligned Processes
• Use of confusing institutional language in some services impacts
communication with families.
• Referral processes vary significantly by service.
3.3 Capacity Constraints
• Youth Work, CAMHS, YP Zone, counselling and Social Work all report insufficient
capacity to meet demand.
3.4 Data Fragmentation
• Agencies hold valuable intelligence, but it is not combined for early identification
or strategic insight.
4. Opportunities for System Development
Build a Coordinated Early Help Pathway
Using existing resources more coherently (Youth Work, Health Improvement, Arrows,
Aberlour, Pathways, School Nurses). 
Strengthen Shared Language and Communication
A consistent approach to mental health, behaviour, transitions, and planning. 
Improve Cross-Agency Data Integration
Pooling education, police, social work and third-sector intelligence.
Develop Systematic Whole-Family Support
Improving alignment between school-based work and family-focused services.
Expand Youth and Family Spaces
Particularly around transitions (P7–S2), outreach, and relational early intervention.
Page 65

Page 66

7 
5. Detailed Service Overviews
5.1 Buckie High ASG – Overview
Key Strengths
• Broad multi-agency provision across Social Work, Education, CLD, Police,
Health, Third Sector, Employability and CAMHS.
• Flexible supports, strong community relationships, and a growing preventative
ethos.
Key Issues
• Increasing complexity of need, including substance misuse and parental mental
health issues.
• Schools reporting more “firefighting” than early intervention.
• Significant space pressures for counselling, meetings and youth work.
• Variation in awareness, access, and referral processes across services.
5.2 Elgin High ASG – Overview
Landscape Summary
• Rich but fragmented service ecosystem.
• Strong provision across mental health, family support, youth work, education,
and employability.
• Inconsistent integration and communication between services.
Key Strengths
• Broad and diverse provision.
• Strong focus on transitions and wellbeing groupwork.
• Needs-led practice in Education Psychology and Social Work.
Key Challenges
• Insufficient counselling capacity (2 days over two large secondaries).
• Referral challenges for YP Zone and Youth Work.
• CAMHS thresholds create inequitable access.
• Geography and transport limit accessibility.
• Patchy coordination and variable Team Around the School implementation. 
Page 66

Page 67

8 
6. Patterns Across the System
6.1 Rising Complexity of Need
Consistent themes across Education, CAMHS, Social Work, Youth Work, Police:
• Severe anxiety and EBSA
• Trauma, neglect, and parental mental health
• Substance misuse including ketamine
• Antisocial behaviour and contextual harm
• Intergenerational trauma and poverty
6.2 Pressure on Schools
Schools are increasingly:
• the primary “open door”
• delivering alternative provision
• managing first-line wellbeing and crisis responses
• absorbing system gaps due to thresholds elsewhere
6.3 Disconnection
• Young people disengaged from education and community. 
• Parents isolated and unsure how to seek help.
• Services disconnected from each other due to thresholds, capacity, and unclear
expectations.
7. Barriers to Effective Delivery
7.1 Structural Barriers
• High and inconsistent thresholds
• GIRFEC planning not consistently understood
• Fragmented processes and unclear pathways
7.2 Workforce Pressures
• Capacity issues across almost every service
• Variable confidence in GIRFEC and multi-agency working
• Cultural barriers: legacy practice, risk aversion, reluctance to collaborate 
Page 67

Page 68

9 
7.3 Operational Issues
• Lack of space for counselling, youth work, multi-agency meetings
• Transport barriers for access and engagement
• Short-term funding limiting sustainability
7.4 Data Limitations
• Weak systems for locality-level insight
• Inconsistent information sharing
• No shared measurement framework
7.5 Community and Family Barriers
• Low engagement
• Poverty and social isolation
• Misconceptions about young people
• Lack of local activities and safe spaces
8. Impact of Current Work
Across Buckie and Elgin ASGs, there is strong evidence that current interventions are
making a positive difference:
Wellbeing & Mental Health
• Reduced anxiety and improved wellbeing
• Better shared understanding of mental health
• Trauma-informed responses strengthening stability
Relationships & Trust
• Early, trusting relationships improve engagement and reduce risk
• Families return to services they trust
Family Support
• Practical help strengthens routines, home environment, and parental capacity
• Preventative work keeps children safely at home
Education & Engagement
• Creative curriculum adaptations
• Improved school responsiveness and flexibility
Page 68

Page 69

10 
Skills & Employability
• Improved confidence, qualifications, financial stability
Community Safety
• Police and youth work improving safety, decision-making and de-escalation
9. Strategic Recommendations
Based on the analysis of workshop content, the system requires:
1. A single Early Help Pathway with clear thresholds, roles, and a “one front door”
model.
2. Protected multi-agency structures, including Team Around the School and Early
Help Hubs.
3. Simplified processes and consistent GIRFEC practice.
4. Investment in preventative capacity, including youth work, family support, and
counselling.
5. Community-anchored hubs to reduce stigma and improve access.
6. Improved data transparency, shared dashboards, and integrated intelligence.
7. Co-design with families to ensure services meet real needs.
10. Early Help Pathway (summary)
Stages 1–6 of an Early Help Pathway include:
1. Identify need early
2. Universal response
3. One-front-door triage
4. Coordinated early help (6–12 weeks)
5. Team Around the Family/School
6. Review, step-down, or closure
For a more detailed early help pathway see Appendix 3: P14 
Page 69

Page 70

11 
11. Appendices
• Appendix 1: Pathway of Support (table)
• Appendix 2: Additional Feedback & Engagement Requests
• Appendix 3: Full Early Help Pathway Model
Appendix 1:  Pathway of Support Table 
Universal Support Email Address
Educational Psychology – Moray
Council
Solution-oriented training for Child
Planning Meetings
edudationalpsychology@moray.gov.uk 
Poverty/Benefits/Money Advice –
Moray Council
Norma.matheson@moray.gov.uk 
CLD
Youth work Buckie and Elgin High
School
Youth space/club pilot at Elgin High
School (P7)
In-school support drop-in at Buckie
High School
Access to community hubs, CLD and
Moray Pathways
Fiona.j.smith@moray.gov.uk 
cld@moray.gov.uk 
Police  Kirsten.douglas@scotland.police.uk 
Aberlour Youth Point/YP Zone
Early help, mentoring, urgent
assistance fund
morayyouth@aberlour.org.uk 
Flexible Learning Resource Team –
Moray Council
Inclusion Training Team
Claire.johnson@moray.gov.uk 
Children First
Financial support 
Group activities
Birth parents – support to any families
with child/children in care or looked
after
Perinatal Service – for any families
with child/children under 5 years 
Caroline.cooper@children1st.org.uk 
Education Central Team
Support and interventions – spans
across all areas/stages 
Stewart.mclaughlin@moray.gov.uk 
Page 70

Page 71

12 
Additional Support Email Address
Educational Psychology – Moray
Council
Development of training resources
(SWAYS) for schools and
parents/carers e.g. literacy
difficulties/EBSA/Demand Sensitivity
Language/evaluation coaching
educationpsychology@moray.gov.uk
Pinefield/MAC Central/EAL Team
Deaf and Visual Impairment Team
Claire.johnson@moray.gov.uk 
Youth Work/CLD
Buckie and Elgin High – employability
at Elgin High/transition work(CBYW)
/nurture/wellbeing in school
Fiona.j.smith@moray.gov.uk
Progress for Parents – Moray Council moraypathways@moray.gov.uk 
Flexible Framework
Pre-approved offers to support
targeted interventions
Predominately school funded but can
be central funded if appropriate (ARG)
All targeted and time limited (with
agreed outcomes and Inclusive
Placement Agreement (IPA) 
1:1 keyworker support 
(15+/6 months prior to leaving school)
moraypathways@moray.gov.uk 
CAMHS (EI service) - NHS gram.rowancentre@nhs.scot 
School Nursing Service - NHS
Child led interventions
Gram.morayschoolnursingservice@nhs.scot 
Whole Family Intensive Support Email Address
Aberlour Youthpoint
Intensive Community Support Service
morayyouth@aberlour.org.uk 
CYP Team (Police Hub) 
Children & Families Social Work childrensaccessteam@moray.gov.uk
CAMHS gram.rowancentre@nhs.scot 
Mentoring Young Talent moraypathways@moray.gov.uk 
Tier 3 (The Promise) Email Address
Children First
Family Group Decision Making – for
families receiving support from Social
Work
Families Together – for families who
are receiving support from Social
Work
Caroline.cooper@children1st.org.uk 
Promoting start-up of Promise Groups louisessozi@moray.gov.uk
CAMHS gram.rowancentre@nhs.scot 
Children & Families Social Work childrensaccessteam@moray.gov.uk
Page 71

Page 72

13 
CLD/Youthwork
Promise Group at Buckie
Elgin High – new group to support
from P7 transition for young care
experienced
Fiona.j.smith@moray.gov.uk
Moray Pathways 
Keyworker support
Mentoring support
CLD funded youth work group
moraypathways@moray.gov.uk 
Parent/Carer/Workforce Training Email Address
Police 
Workforce training 
Education Psychology 
Professional Reflective Supervision
for all Head Teachers (PRS)
Parent sessions on Emotional Based
School Attendance (EBSA)
educationpsychology@moray.gov.uk
Inclusion Training Team 
Bespoke training for schools/parents
based on needs 
Appendix 2:  Other Thoughts from Workshop Participants💭   
Who we still need to hear from:
Community Safety
Action for Children – especially youth bus
Exchange Counselling
SAMH
Adult & family learning
Community Wardens – antisocial behaviours in both communities 
Missing – health visiting team and community nursing team
SDS/DWP/DYW Moray
Request for Follow Up:
Could questions from today be shared as a document to enable more in-depth
conversations within teams?
Collation data from ‘no named’ discussion.
Monthly data from The Exchange/SAMH of number of referrals would be helpful 
Page 72

Page 73

14 
Appendix 3:  Draft Early Help Pathway for Buckie and Elgin High
ASG areas 
Early Help Pathway (Draft Design)
A system-wide model for Buckie & Elgin High ASGs
1. Purpose
To ensure children, young people and families receive the right help at the right time,
through a simple, coordinated, multi-agency pathway that reduces crisis escalation,
strengthens early intervention, and aligns fully with GIRFEC and The Promise.
2. Overview of the Early Help Pathway
The proposed pathway includes six stages, from identification to closure, supported by
clear roles, thresholds, referral routes, and multi-agency processes. 
STAGE 1 — Identifying Need Early 
Who identifies need?
Any practitioner (education, youth work, health, police, third sector) or a family
themselves.
What triggers early help?
• Emotional wellbeing concerns (anxiety, low mood, EBSA)
• Behaviour changes
• Emerging family stress, parental mental health needs
• Early substance use
• Social isolation or disconnection
• Changes in attendance or engagement
• Minor contextual safeguarding concerns
Tools used at this stage: 
• Single-page Wellbeing Snapshot
• Strengths and worries conversation
• Consent explained early (family-centred, transparent) 
Page 73

Page 74

15 
STAGE 2 — Universal Response (First Conversation)
A short, relational, solution-focused conversation takes place with the child/young
person/family.
The practitioner:
1. Listens to what’s going well and what’s hard
2. Checks what support is already in place
3. Offers immediate universal help where possible
4. Explains the Early Help Pathway and choices
Outcome options at Stage 2:
• Needs resolved with universal help → close
• Family wants additional support → go to Stage 3
• Practitioner believes multi-agency support beneficial → Stage 3 
STAGE 3 — Early Help Request & Triage (‘One Front Door’)
A single, simple form is submitted to an Early Help Coordination Hub.
The Hub includes representatives from:
• Education (NP / guidance / CFW / family link worker)
• Social Work (early help, not statutory)
• CLD / Youth Work
• Health (school nursing / health improvement)
• Third Sector (Aberlour, Children 1st, YP Zone)
• Police (for contextual safeguarding intel, NOT risk escalation)
Functions of the Hub:
• Screens every request within 5 working days
• Reviews existing data (attendance, police intel, strengths, history)
• Allocates the right early support
• Ensures no family falls through gaps 
Page 74

Page 75

16 
Possible triage outcomes:
• Universal support strengthened
• Early help allocated (Stage 4)
• Whole-family support required
• Multi-agency plan recommended
• Immediate statutory threshold identified → Social Work Intake
This creates shared accountability and prevents “stuck cases.” 
STAGE 4 — Coordinated Early Help (6–12 weeks) 
A named practitioner becomes the Early Help Lead (not automatically the school).
The Lead Practitioner:
• builds a trusting relationship
• coordinates activities
• ensures family choice and voice
• maintains regular check-ins
• links with partner agencies
• updates the Wellbeing Snapshot
Examples of early help:
• youth work mentoring
• family link worker sessions
• group programmes (wellbeing, transitions, parenting)
• health improvement (sleep, nutrition, sexual health)
• CAMHS early intervention skills (LIAM/BBA)
• Aberlour or Children 1st early family support
• employability mentoring for parent/YP
The focus is preventative, relational, and time-limited, but extendable. 
Page 75

Page 76

17 
STAGE 5 — Team Around the Family or School (if needed)
Used when: 
• needs are multi-agency
• progress stalls
• risk increases
• family stress becomes complex
Key features:
• Occurs within 10 days of escalation
• Shared agenda: strengths, needs, goals, actions
• Clear roles and responsibilities
• Family voice central
• Single, simple plan replaces multiple plans
• Regular reviews
• CAMHS, Police, Social Work involved proportionately
This stage prevents drift and avoids crisis escalation. 
STAGE 6 — Review, Step-Down or Closure
Options:
• Needs met → close with family agreement
• Step down to universal supports
• Continue early help with revised goals
• Step up to statutory intervention (Social Work Tier 3)
Closure includes:
• what’s working well
• what helped
• what could be used in future
• optional re-entry without repeating the full form (“light touch re-entry”) 
Page 76

Page 77

18 
Key Features that Strengthen This Pathway aligned with what practitioners asked
for:
✔ one front door
✔ one form
✔ protected multi-agency time
✔ shared thresholds
✔ relational early help
✔ consistent GIRFEC practice
✔ accessible family-centred spaces
✔ clear roles
✔ improved data sharing
Governance & Accountability Model
Locality-Level Governance:
• A Locality Early Help Partnership Group for Buckie
• A Locality Early Help Partnership Group for Elgin
Chaired by Education or Social Work (rotating model). 
Reports to:
Children’s Services Planning Group
GIRFEC & The Promise Implementation Board (once established) 
Monthly oversight includes:
• volume of early help requests
• timeliness of responses
• outcomes and impact
• barriers and operational learning
• partnership attendance and engagement 
Data & Insight Approach
The pathway uses:
• a single wellbeing snapshot
• monthly referral trends
• partnership intelligence (including police and education)
• locality dashboards
• qualitative feedback from families 
This enables earlier identification, trend spotting and planning. 
Page 77

Page 78

19 
What This Pathway Achieves
For Families
✓ Simple, human and non-stigmatising
✓ Clear information on support
✓ One plan, one lead
✓ Early help without thresholds blocking access
For Practitioners
✓ Clear roles and expectations
✓ Predictable multi-agency structures
✓ Reduced duplication and “telephone tennis”
✓ Shared decision-making
For the System
✓ Less crisis response, more prevention
✓ Improved GIRFEC practice
✓ Better use of resources
✓ Stronger alignment with The Promise 
Page 78

Page 79

REPORT TO:    COMMUNITY PLANNING BOARD ON  3 JUNE 2026 
SUBJECT:          MAXIMISING NET SOCIO-ECONOMIC IMPACTS FROM RENEWABLE 
ENERGY DEVELOPMENTS 
BY:                         EXECUTIVE DIRECTOR (ECONOMY, ENTERPRISE AND OPERATIONS) 
1. REASON FOR REPORT 
1.1. The purpose of this report is to ask the Community Planning Board to endorse the
Council's approach to maximising socio-economic benefits from future energy
developments in Moray, and to agree to play an active role in shaping that work
going forward. 
2. RECOMMENDATION 
2.1. It is recommended that the Community Planning Board: 
i. Notes progress on developing a policy and delivery model to
maximise socio-economic impact from future energy developments;
ii. Endorses the Council's proposed approach to maximising socio-
economic benefits from future energy developments in Moray, as set
out in this report;
iii. Agrees to actively engage in the development of the Moray Socio-
Economic Plan, including providing input into identifying key
strategic priorities for Moray that developers will be encouraged to
address; and
iv. Notes the proposed work plan and timeline in Appendix 2, including
the planned engagement with the Community Planning Board at
Stages 3, 5 and 6. 
3. BACKGROUND 
3.1. Highlands and Islands Enterprise estimate £8.91 billion of regional
transformation opportunities in Moray over the next 15 years, primarily onshore
and offshore wind and associated grid infrastructure. Capturing the full benefit
of this for Moray's communities requires a clear plan and strong partnerships. 
Item 6.
Page 79

Page 80

3.2. Following the introduction of the National Planning Framework 4 (NPF4) on 13
February 2023, future developments must demonstrate how they intend to
“maximise net economic impact, including local and community socio-
economic benefits such as employment, associated businesses and supply
chain opportunities”. At present there is no agreed socio-economic plan setting
out what Moray's key priorities are, meaning the Council lacks a clear basis for
negotiating with developers during the planning process. 
3.3. Officers are proposing a new local policy to maximise the socio-economic
impact from renewables, which will be included within the new Local
Development Plan 2027. The policy will be supported by a Moray Socio-
Economic Plan which will set out Moray’s key strategic priorities for the future.
The new local policy and socio-economic plan will be separate to community
benefit funding provided by developers. If approved, the new Local
Development Plan would be considered along with NPF4 to form the
Development Plan for Moray with significant weight given to local policy
positions. This work will echo similar developments in Highland Council, with
their Social Value Charter, and Shetland Islands Council’s Energy Development
Principles. 
3.4. The current process is that developers negotiate directly with communities to
develop a community benefit package, in addition to submitting a Community
Wealth Building Plan (CWBP) as a requirement of NPF4 policy 25 and the
Council’s Community Wealth Building supplementary planning guidance. While
community benefits do play a positive role in supporting communities, they are
not primarily focused on addressing key strategic issues facing Moray. 
3.5. Between 2020-2023, EDF’s Community Benefit Fund for Dorenell windfarm
allocated approximately £1.3 million to eligible communities. From the projects
receiving funding, less than 18%  went towards housing, sustainability,
economic development, tourism, transportation and improving access to
services. The majority of funding went towards environment and heritage,
community and recreational facilities (building and equipment) and staff for
those facilities and activities. The goal of this work is to increase funding
towards key strategic priorities, such as affordable housing, supply chain
development and tourism, in order to enhance the impact for Moray’s
economy. 
3.6. Funding for external consultancy was recently approved by Moray Council to
develop a delivery model for the Moray Socio-Economic Plan, with Aquatera
being selected to carry out this work. The commissioned work will cover the
following: 
• The advantages and disadvantages of seeking developer payments as a
percentage of gross revenue for renewable energy projects and an
optimal level (Comparing this to a fixed £/MW/year approach).
• The most feasible approach to determining payments/contributions for
each type of development (onshore vs offshore wind, energy
transmission etc)
• The structure and scope of a regional fund for Moray.
Page 80

Page 81

• How much could potentially be raised for a regional fund annually,
depending on future developments.
• The potential implications for community benefit funds if additional
funding is requested to address the Moray Socio-Economic Plan.
• Depending on how much can reasonably be raised, the impact of these
funds on addressing socio-economic issues.
• The feasibility of requiring shared ownership to be considered for
renewable energy developments in Moray. In particular, having a tiered
system where nearby communities have the option to buy-in first, and if
they can’t take up the offer, then the process should be opened to the
whole of Moray (making it possible for communities to get together or the
Council and other stakeholders to raise funds to buy-in). 
4. PROPOSALS 
4.1. A Moray Socio-Economic Plan setting out the key strategic priorities for Moray,
will be developed collaboratively with communities, the Community Planning
Partners and the Moray Economic Partnership. This plan will give the Council
and its partners a clear, agreed position from which to engage with developers.
Priorities might include affordable housing, childcare, poverty reduction, health
and wellbeing, natural capital, and employability. 
4.2. Once finalised, the Moray Socio-Economic Plan will be linked to the new Local
Development Plan 2027. Developers submitting planning applications will be
required to prepare a Socio-Economic Benefit Maximisation Plan (SEBMP)
setting out how they will address the Moray Socio-Economic plan's priorities,
either directly (for example, by building affordable housing or funding skills
training) or indirectly through financial contributions into a Moray Development
Fund. 
4.3. Developers will be encouraged to make direct financial contributions into a
Moray Development Fund, administered by a standalone entity, to address
strategic priorities that cannot be tackled through direct developer provision
(Appendix 1). Aquatera's research will help determine the structure,
governance and scale of this fund. Shared ownership of renewable energy
developments will also be explored, with nearby communities given priority to
buy in, and the option opened to the wider Moray area, including the Council, if
communities cannot fully take up the offer. 
5. NEXT STEPS 
5.1. The CPB has a critical role to play in developing the Moray Socio-Economic
Plan, both as a contributor to shaping Moray's priorities and as a partner in
ensuring the plan is representative of the area. The CPB is specifically identified
in the proposed process as a key partner at multiple stages, including the initial
stakeholder engagement to develop the draft Moray Socio-Economic Plan and
formal consultation before the plan is finalised. The development stages are set
out in appendix 2. 
Page 81

Page 82

5.2. We are asking the CPB to assist with following during the relevant development
stage: 
• Share their knowledge of Moray's communities and help identify the key
socio-economic priorities that a Moray Socio-Economic Plan should
address.
• Consider what each member organisation can contribute, directly or
indirectly, to maximising socio-economic benefits from energy
developments.
• Engage actively at the stakeholder workshop (Stage 3) and wider
engagement phase (Stage 5), and provide input during formal
consultation (Stage 6).
• Help ensure the plan reflects the full breadth of community need across
Moray, including in areas most affected by energy developments. 
6. CONCLUSION 
6.1. The scale of renewable energy and infrastructural investment forecast in Moray
over the coming decades represents a significant opportunity. To maximise the
socio-economic benefit for communities will require a clear plan, strong policy,
and genuine partnership. The Community Planning Board has a central role in
this process. 
6.2. Officers are asking the CPB to endorse the proposed approach and to commit
to engagement during the specified stages of development of the Moray Socio-
Economic Plan. The priorities that the CPB helps to identify will shape what
developers are required to deliver over the coming decades. 
Author of Report: Joseph Duggan: Community Wealth Building Officer 
Page 82

Page 83

Appendix 1 
Page 83

Page 84

Page 84

Page 85

Appendix 2 
Stage Period Activity
Stage
1
Q2-Q3 2026 Commission external consultancy (Aquatera)
Technical research to inform policy: optimal contribution models, fund structure,
potential income, shared ownership feasibility.
Stage
2
Q3 2026 Internal review of findings
Officers review consultant outputs, align with LDP policy framework and prepare
materials for stakeholder workshop.
Stage
3
Q3 2026 Stakeholder workshop – draft Moray Socio-Economic Plan
Develop draft plan with public sector partners, community/third sector and
economic stakeholders. Agree strategic priorities.
Stage
4
Q3-Q4 2026 Community engagement - Joint Community Councils
Meaningful community input into the plan; establish an ongoing community focus
group for iterative development.
Stage
5
Q3-Q4 2026 Wider stakeholder engagement
Targeted sessions with Business Gateway, FSB, Chamber of Commerce, MEP and
Community Planning Partnership.
Stage
6
Q4 2026-Q1
2027
Formal consultation
Draft plan and policy guidance presented to Full Council; authority sought to proceed
to formal public consultation.
Stage
7
Q2-Q3 2027 Report to Council and finalise plan
Consultation responses analysed; final amendments made; Moray Socio-Economic
Plan adopted and guidance in place. 
Page 85

Page 86

Page 86

Page 87

REPORT TO: COMMUNITY PLANNING BOARD ON 3 JUNE 2026 
SUBJECT: MORAY GROWTH DEAL 2025 ANNUAL REPORT 
BY: EXECUTIVE DIRECTOR (ECONOMY, ENTERPRISE AND
OPERATIONS) 
1. REASON FOR REPORT 
1.1. To provide a copy of the Moray Growth Deal’s 2025 annual report for
consideration and approval. 
2. RECOMMENDATION 
2.1. It is recommended that the Community Planning Board considers and
approves the annual report for publication.    
3. SUMMARY 
3.1. A condition associated with Growth Deal funding is that a report is produced
annually providing an overview of work undertaken in the past 12 months, with a
forward look at the year ahead.  This paper introduces the annual report covering
the 2025 calendar year, looking ahead to activity planned during 2026.   
3.2. A draft version of the report was submitted and approved at the Moray Growth
Deal (MGD) Programme Board on 29 January.  Subsequently, comments were
sought from the Moray Economic Partnership (MEP), enabling a revised, final
version to be approved by the MGD Programme Board on 26 March.  In advance
of the 30 June Council meeting, the report will be considered at Corporate
Committee on 26 May (in conjunction with the annual transformation report) and
the Community Planning Board on 3 June.  Appendix 1 contains a copy of the
2025 MGD Annual Report. 
4. BACKGROUND AND CONTEXT 
4.1. 2025 has been a progressive year for the MGD.  Activity has become more visible,
through increased construction activity and service stand up preparations
involving businesses and citizens.  That said, the red / amber RAG status is a
direct result of challenges affecting 2 projects (a need to identify a replacement
Item 7.
Page 87

Page 88

skills project and move the South Steet regeneration site into delivery). 
Collaborative work has taken place with a range of partners including
Government funders and it is anticipated that activity undertaken during 2025
will result in the risk profile of the Deal decreasing in the first half of 2026.   
4.2. A copy of the 2025 annual report is provided in Appendix 1 of this report.  Key
achievements listed in this include:   
Q4 24/25 ▪ Skills workshops held that identified potential proposals for a
replacement skills and innovation project.
▪ Tender for Elgin Town Hall construction published.
▪ Award of Elgin STEM Hub construction activity to Robertson
(Construction) Ltd
Q1 25/26 ▪ Bus Revolution phase 2 services launched (northern coastal
communities), supported by a communication and engagement
campaign involving a leaflet drop a five week radio / digital
marketing campaign.  
▪ Legal process to revise the Cooper Park Deed started following the
25 June Moray Council decision. Work due to be concluded in the
second half of 2026.  
Q2 25/26 ▪ South Street site clearances (Housing Mix Delivery and the
Business Enterprise Hub) completed along with archaeological
excavations.
Q3 25/26 ▪ Grant Lodge design activity reached RIBA stage 3, with applications
for planning and listed building consent submitted.
▪ Contract signed between Taylor and Fraser and Moray Council,
with work on the renovation of Elgin Town Hall starting.
▪ Soft launch of ‘STEM Starts’ service with the first visitors shown the
Elgin Hub and the EY STEM Manager appointed.  
▪ Operator secured for the MICM facility (Elevator UK)   
4.3. Looking ahead to 2026, the scale of work will increase further through the
delivery of new services, existing and new construction activity progressing and
the advancement of planning for future new services.   
Q4 25/26 ▪ MICM building completed
Q1 26/27 ▪ Business Enterprise Hub project expected to enter delivery.
▪ Start of construction activity at South Street (Housing Mix Delivery -
affordable housing and Business Enterprise Hub)
▪ Analysis of anonymised mobile data to develop headline
‘movement pattern’ insights across the region, informing the
development of phase 3 Bus Revolution expansion plans
▪ Completion of the first 39 affordable homes in Speyview, Aberlour.  
▪ Ministerial launch of the MICM service.  
▪ Paper to be submitted to Moray Council regarding next steps with
Grant Lodge.  
Q2 26/27 ▪ EV charging infrastructure to be installed to support phase 3 rollout
(Q1 2027/28 FY) of the Bus Revolution project
▪ Digital Health project to end, with Board undertaking closure
activity.
Page 88

Page 89

▪ Operational model for the EY STEM service to be finalised
(including the opening hours of facilities and access arrangements
for different groups including the schools, nurseries and members
of the public), following evidence gathering from the first six
months of delivery.
Q3 26/27 ▪ Plans for phase 3 of the Bus Revolution project to be agreed prior to
implementation in Q1 2027/28.   
4.4. Whilst positive progress continues to be made, the Deal is currently managing a
number of risks and issues.  The most significant strategic entries are noted
below.   
4.5. Programme:   
Area of focus Commentary  
South Street
regeneration site   
- At the time of drafting this report, UHI, the Council and
developer were working collaboratively to conclude legal
agreements for the site and for a new registered Social
Landlord to be onboarded.  With legal negotiations taking
longer than anticipated, it is hoped that all parties can
conclude agreements by early Q1 2026/27, enabling
construction activity to commence later this quarter.  
- This has been a complex site to move into delivery, with
challenges having to be overcome (UHI’s loss of revenue
funding and the withdrawal of the original RSL). 
Ensuring there is
sufficient capacity in
place to deliver Deal
activity. 
- Projects working on a case by case basis to understand
resourcing requirements beyond initial contractual
durations of Project Manager positions.  Change requests
being considered by the MGD Programme Board during
2026.  
- Need to generate clarity on what is required for post
project monitoring and evaluation activity and clarify who
is responsible for undertaking this.  
Identifying a
replacement skills
project
- Following the workshop series in Q4 2024/25 work has
been undertaken to enhance proposals from the
University of Highlands and Islands (UHI) and the Digital
Health Institute (DHI), whilst securing interest from 2
other academic providers.  
- Optimat worked during Q4 2025/26 to review options and
identify a recommended project vision.  This was
advanced to a Strategic Outline Case stage, which is now
the subject of Council and Government review.  Aim is for
an Outline Business Case to be prepared by the end of
2026/27 FY.   
4.6. Project:   
Area of focus Commentary  
Work to stabilise and
enhance the revenue
- Passenger numbers encouraging, but mainly
concessionary card users.  
Page 89

Page 90

performance of Bus
Revolution 
- Team working to drive efficiency through AI simulation and
mobile data trends for future route development.
- Enhance targeted marketing activity. 
Funding shortfall
associated with Grant
Lodge
- Despite positive progress made during 2025, there
remains a funding shortfall of £2.4m.
- Whilst the Council will continue to progress opportunities
for further external funding, funding to support a
Development Officer within the Grant Lodge Trust should
provide opportunities to compete for funding sources not
open to the Council.
- If approved by the Moray Council in Q1 2026/27, a 2 step
procurement process should help develop a more robust
RIBA 4 vision for the facility with this process looking at
value engineering opportunities and the potential for
phased redevelopment.   
4.7. Looking at wider economic development activity taking place throughout Moray,
it is critical that consideration is given to how Deal activity interacts with other
projects and programmes, with a view to minimising risks and maximising
benefits to be realised.  With the Service Manager (Growth Deal) chairing the
Moray Economic Partnership (MEP) structural funds sub group, there is a forum
in place that will drive collaboration across key public agencies and track current
and potential future activity to ensure clarity amongst all parties.   
4.8. It is planned that during 2026 the group look at significant activity taking place to
the east (Energy Transition Zone) and west (Inverness and Cromarty Green
Freeport) to ensure that Moray is positioned to support and benefit from these
economic growth initiatives.   
Author of Report:  Michael Kelly, Service Manager (Growth Deal) 
Background Papers:   
Appendix 1:  Moray Growth Deal 2025 annual report 
Page 90

Page 91

ANNUAL REPORT
covering the 2025 calendar year
Page 91

Page 92

Housing Mix, Dallas DhuPage 92

Page 93

Contents 
1 Programme headlines 
1.1     2025 achievements 
1.2     Key 2026 milestones 
2 Statement from Moray Council’s Growth Deal Lead 
3 Progress made throughout 2025 
3.1 Programme overview 
3.1.1     Summary of what the Deal is working to achieve
3.1.2     Status of Deal activity 
3.2 Project updates 
3.2.1 Bus Revolution
3.2.2 Business Enterprise Hub
3.2.3 Cultural Quarter
3.2.4 Digital Health
3.2.5 Early Years STEM
3.2.6 Housing Mix Delivery
3.2.7 MICM 
3.2.8 Skills and innovation project 
4 Programme Management Office activity planned for 2026 
4.1 PMO milestones to be achieved
4.2 Factors that require action or future delivery could be impacted
4.3 Monitoring the benefits to be realised by the Deal 
5 Financial summary 
5.1 Funding sources for Deal activity
5.2 Government funding drawn down Q4 24/25 to Q3 25/26 
3
3
4
5
6
6
6
7
9
10
14
19
24
30
35
38
42 
46 
46
47
48 
49 
49
50
1
Page 93

Page 94

6 Engagement and consultation activity undertaken during 2025 
7 Programme structure and governance activity
7.1 Structure of Moray Growth Deal activity and Officers involved 
7.2 Summary of assurance activity progressed during 2024
7.3 Summary of audit activity undertaken during 2025
7.4 Complying with report findings from Scottish Parliament’s 
Economy and Fair Work Committee report on Growth Deal activity   
Appendix A
2025 internal audit report on the Moray Growth Deal 
Appendix B
Summary of 2025 audit of Manufacturing Innovation Centre by Highlands
and Islands Enterprise 
2
51 
52
52
54
56
59 
Page 94

Page 95

3
1. Programme headlines 
1.1 2025 achievements
Skills workshops held that identified potential proposals for a
replacement skills and innovation project.
Tender for Elgin Town Hall construction published.
Award of Elgin STEM Hub construction activity to Robertsons
(Construction) Ltd 
Bus Revolution phase 2 services launched (northern coastal
communities), supported by a communication and
engagement campaign involving a leaflet drop and a 5 week
radio / digital marketing campaign.  
Legal process to revise the Cooper Park Deed started following
the 25 June Moray Council decision. Timescales are still being
confirmed, but it is hoped this work will conclude in the
second half of 2026.   
South Street site clearances (Housing Mix Delivery and the
Business Enterprise Hub) completed along with archaeological
excavations. 
Grant Lodge design activity reached RIBA stage 3, with
applications for planning and listed building consent
submitted.
Contract signed between Taylor and Fraser and Moray Council,
with work on the renovation of Elgin Town Hall commencing.
Soft launch of ‘STEM Starts’ service with the first visitors shown
the Elgin Hub and the EY STEM Manager appointed.  
Operator secured for the MICM facility (Elevator UK)  
MICM phase 1 assets completed (central hub and incubator
units)
Q4 
24/25
Q1 
25/26
Q2 
25/26
Q3 
25/26
Page 95

Page 96

4
Ministerial launch of STEM Starts service 
Ministerial launch of Manufacturing Innovation Centre service
Business Enterprise Hub project expected to enter delivery
Commencement of construction activity at South Street
(affordable housing and Business Enterprise Hub)
Analysis of anonymised mobile data to develop headline
‘movement pattern’ insights across the region, informing the
development of phase 3 Bus Revolution expansion plans
Completion of the first 39 affordable homes in Speyview,
Aberlour.   
EV charging infrastructure to be installed to support phase 3
rollout (Q1 2027/28 FY) of the Bus Revolution project
Digital Health project to end, with Board undertaking closure
activity.
Operational model for the EY STEM service to be finalised
(including the opening hours of facilities and access
arrangements for different groups including the schools,
nurseries and members of the public), following evidence
gathering from the first 6 months of delivery. 
Plans for phase 3 of the Bus Revolution project to be agreed
prior to implementation in Q1 2027/28. 
1.2 Key 2026 milestones
Q4 
25/26
Q1 
26/27
Q2
26/27
Q3 
26/27
Page 96

Page 97

5
2 Statement from Moray Council’s
Growth Deal Lead
2025 was a busy year for our Moray
Growth Deal. 
My expectation was that activity would
move from ‘behind the scenes’ work, to
being much more visible ‘on the ground’
and that is what we have seen. I’m
pleased by the efforts of all our project
teams as extensive steps have been
taken to advance planning, commence
construction activity and prepare for the
launch of new services.  Specifically: 
I’ve had the opportunity to visit our
new STEM Hub in Elgin and learn
more about the service.
Taylor and Fraser has started work
on the transformation of Elgin Town
Hall and I look forward to seeing this
building being back in use during
2027.
I had an opportunity to spend time
with UKG Minister Kirsty McNeill to
see a powerful demonstration from
the Digital Health project of the need
that sits behind the applications that
are in development.  
The pace of Deal activity shows no sign
of slowing. As we look forward,
throughout 2026 I’m excited to see: 
Manufacturing Innovation Centre
services start from their new facility
in Forres, which will be run by
Elevator UK on behalf of Highlands
and Islands Enterprise. This will see
the Moray Growth Deal supporting
our manufacturing businesses,
helping them to innovate and grow
our economy.  
Construction activity starting at South
Street, despite the challenges faced
in the latter part of 2025.  
Artificial Intelligence simulation that
will help inform the future shape of
m.connect services.
Alongside the optimism, it’s important
we have a laser focus on risks that may
affect our ability to realise the full
potential of the Deal. Specifically, as
services are stood up, teams need to
ensure revenue operating models are
continually reviewing data and getting
customer feedback to enable them to
operate as efficiently as possible. In
parallel, we need to determine next
steps with Grant Lodge, a building for
which a design and vision have been
prepared but that carries a financial
shortfall. 
2026 is shaping up to be another busy
year, but one that will see Moray
residents and businesses becoming
even more involved in the
transformative projects being delivered.   
Cllr Marc Macrae
Moray Council Growth Deal Lead
Page 97

Page 98

6
3 Progress made throughout 2025 
3.1 Programme overview 
3.1.1 Summary of what the Deal is working to achieve 
All Moray Growth Deal activity has been developed based on the desire to realise a
number of ‘Pillars’.  These define the local change sought and were developed
through extensive engagement with private and public sector partners when the
Deal was initiated in 2021. 
Connections: Improving transport (particularly rural transport within Moray),
driving digital collaboration and expanding the number of exports. 
Business support, skills and employability:  Ensuring fair opportunity for
jobs, increasing skills and maximising productivity / competitiveness.   
Moray, the place:  The marketing of Moray to reference natural assets, the
attractiveness of the area for hospitality / tourism, quality of life / lifestyle
available, the cohesive community that can be found and the quality of the local
environment. 
Developing Moray’s key business sectors:  Building on traditional strengths in
areas like food and drink, manufacturing and construction, but also looking at
growth areas such as renewables, tourism and aviation. 
In practical terms, the Deal is working to achieve the following targets for the
region:   
Direct and indirect creation of over 
3,500 jobs
450 of the 3,500 jobs will result
directly from Growth Deal projects
50,000 more tourists will be
attracted to Moray
Over 300 new affordable
homes will be constructed
450 businesses will be supported
to scale, increasing Moray’s economic
productivity by £82m
Creation of new and improved
educational, cultural and business
innovation facilities
Page 98

Page 99

7
3.1.2 Status of Deal activity
During 2025 project teams and the PMO have been working to advance delivery
activity, which has seen a significant pulse of: 
Projects delivering for Moray, 6 of the 8 projects are at this stage.  
Construction procurement activity specifically tenders for Elgin Town Hall,
Manufacturing Innovation Centre and Elgin STEM Hub.
Service start up and readiness work by Elevator UK (MICM) and STEM starts.   
In parallel, work has been ongoing to resolve challenges facing two of the Deal’s 8
projects: 
Identifying a new skills project:  Following a series of workshops, engagement
has been undertaken with a wide range of prospective partners.  Consultancy
support is in place to advance proposals to a strategic outline case stage in the
first half of 2026 (drafting and governance process).  
South Street (Housing Mix Delivery and Business Enterprise Hub):  This
multi-partner regeneration of a city centre site involves UHI, Moray Council and
Robertsons Property Limited.  In late 2025 a Registered Social Landlord for the
housing element withdrew, with Robertsons working to advance discussions
with a replacement.  Parties are now working to complete all legal agreements. 
Closure
Project
complete and
being closed
Delivery
Project in
delivery
FBC
Full business
case
OBC
Outline
business case
SOC
Strategic
outline case
High level phases of the lifecycle of projects:
Page 99

Page 100

8
Project 
Bus Revolution 
Business
Enterprise (BE)
Hub 
Cultural Quarter 
Digital Health 
Early Years (EY)
STEM 
Housing Mix
Delivery 
MICM 
Skills and
innovation
SOC
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
In progress
OBC
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Delivery
In delivery
Complete
Complete
In progress
Scheduled
Scheduled
Expected
Q4 25/26
TBC
TBC
In delivery
In progress
Scheduled
In delivery 
In progress
In delivery
Complete
In planning
Scheduled
In delivery
In progress
Scheduled
In delivery
Complete
In progress 
In progress
Scheduled
Closure 
Expected
Q4 25/26
Lifecycle stage
Phase 1:  Speyside (by 2023)
Phase 2:  Northern coastal communities (by 2025)
Phase 3 (by 2027)
Phase 4 (by 2030)
Phase 5 (by 2031)
Phase 1a:  BE Hub facility opens (by 2027)
Phase 1b:  Service stand up (by 2027)
Phase 1:  Elgin Town Hall (by 2027)
Phase 2:  Grant Lodge (by 2029)
Phase 1:  Elgin hub, mobile service, outreach (by 2026)
Phase 2:  East, west & outdoor hubs (by 2029)
Phase 3:  Grant provision (by 2031)
Phase 1 (by 2027)
Phase 2 (by 2031)
Phase 1: MICM Hub and incubator units (by 2026)
Phase 2:  Grow on space (by 2028)
Pre-initiation milestone:  Draft SOC (by 2026)
Pre-initiation milestone:  Draft FBC (by 2027)
5 living labs to be tested and evaluated (by 2026)
FBC
Complete 
At an advanced stage 
Complete 
Complete 
Complete   
Complete 
Complete 
The Moray Growth Deal (MGD) is one of a number of transformational activities
taking place within the Council and with regional partners to deliver improved
outcomes for Moray.  To ensure there is appropriate awareness of Deal activity,
progress updates are provided to the Council’s Transform Board, with the main
governance board being the monthly, multi-partner MGD Programme Board. 
Page 100

Page 101

9
PROJECT UPDATES
Page 101

Page 102

Current status Phase 1 commenced in April 2023, phase 2 in April
2025.  Evaluation activity underway to inform
development of phase 3 which will go live in April 2027. 
Project vision Increase the number of people using public transport to get
to and from rural areas for work, education and leisure.
10
Value £4m (Capital: £4m SG) 
Lead Body The Moray Council
3.2.1 Bus Revolution
Project summary 
Bus Revolution is an innovative transport initiative designed to deliver a step
change in public transport availability across rural Moray. Building on established
experience, the project aims to significantly increase the number of people using
buses to access employment, education, and leisure opportunities. Central to this
transformation is the introduction of a flexible, demand-responsive transport (DRT)
service, supported by app-based technology that enables real-time journey
bookings in a user-friendly, ‘Uber-style’ format. 
The project is underpinned by a £4.3 million investment, covering capital costs for
operational systems, branding, marketing, electric vehicle procurement, and the
installation of charging infrastructure to support a modern, efficient, and low-
carbon transport network. 
By 2030, Bus Revolution aims to achieve the following investment objectives: 
1. Increase public transport passenger journeys by 30,000 per annum.
2. Reduce environmental impact of transport in Moray by 30 tonnes CO₂e per
annum.
3. Achieve a 20% reduction in the number of people facing transport barriers to
employment, education, or recreation. 
Key Stakeholders Involved: 
Moray Council:  Project leadership and strategic oversight.
Transport Scotland:  Funding and policy alignment.
Regional Transport partner:  HiTrans, Funding and policy alignment.
GIS & Data Teams:  Data sourcing, mapping, and analysis.
Technology Providers:  Liftango, DRT platform and app development.
Local Communities & Passengers:  End users and contributors to service design.
Workforce Development Partners:  Supporting mobility for employment and
education. 
Page 102

Page 103

11
Achievements made during 2025 
Vehicle expansion
Delivery and integration of 6 electric vehicles into the core fleet, supporting low-
emission operations across Moray 
Workforce growth
Recruitment of 8 additional drivers, enhancing service capacity and coverage 
Passenger growth:
Achieved 75,356 passenger journeys in Year 2 (2024–2025), up from a pre-
project baseline of 45,881 — a 64% increase
Notable growth in usage during early morning (0600–0800 hrs) and mid-evening
(1800–2000 hrs) periods, improving access to transport during previously
underserved times 
Digital transformation:
The passenger app became the dominant booking platform, with over 38,000
journey requests placed via the app
Telephone bookings decreased to 23,500 calls, down from 29,000 in the
previous year, indicating a successful shift to digital engagement 
Environmental impact:
Direct CO₂e emissions savings of 36.9 tonnes through EV usage
Indirect emissions savings of 34.7 tonnes CO₂e from increased bus journeys
replacing car travel 
Service enhancements:
Launch of new weekend services to improve leisure and social connectivity.
Strengthened marketing and communications, targeting specific user groups to
raise awareness and encourage uptake of services. 
2026 Milestones
Milestone 
Mobile data project 
Phase 3 service
operational plan 
Phase 3 launch date
Due Date 
Jun 2026 
Oct 2026 
Apr 2027
RAG* RAG comment 
Additional funding
source being sought. 
To be based on
evidence from AI
simulation activity
(complete) and mobile
data project.  
* Risk rating – red, amber, green
Page 103

Page 104

12
Risks and issues that require management during 2026 
Effect on the project 
Increased costs,
reduced revenue
income will make it
and harder to achieve
cost neutrality /
profitability.  
Also applies to
commercially led
services and has the
potential to see public
transport services
reduced throughout
Moray.   
Any variance between
actual and projected data
used in the FBC financial
model may impact the
Council's revenue
commitment required to
support the service. This
could affect long-term
sustainability and
planning for evening and
weekend services. 
Services cannot be
deployed as planned,
delaying expansion
and preventing
achievement of
project objectives. 
Increased financial
outlay for recruitment
and training. 
Mitigation 
Monitor impact on
commercial
operators.
Engage with
Transport Scotland
to identify support
for rural services. 
Scenario planning
for revenue
shortfalls
Explore efficiency
measures (e.g.,
route optimization,
EV cost savings) 
Ongoing financial
monitoring to
compare actual vs.
projected
performance. 
Ongoing review of
data throughout
2026 as phase 3
plan developed. 
Regular review of
vacant positions
Open adverts for
resilience staff. 
Make use of skills
transition pathway
created with DWP –
develop cat B
drivers into Cat D &
D1 where applicable
PTU structure and
recruitment strategy
may need review to
ensure sustainable
staffing for future
phases.
Risk or issue 
Risk:  Continuing
changes in
operational  costs
/ revenue could
affect profitability
(National changes
to bus operator
funding for
concessionary
fares) and National
Insurance
increases for staff.   
Risk:  Full business
case data
(passenger
numbers, fare
income etc.) may
vary from delivery
evidence. 
Issue:  Failure to
recruit the
required number
of drivers and
support staff to
deliver the
operational model. 
Target date
for resolving
the entry 
Ongoing
monitoring
through 2026 
Q3 26/27 
Ongoing
through 2026 
Page 104

Page 105

13
Focus on… m.connect service 333 
In May 2025, Bus Revolution launched the m.connect 333 Service as part of Phase
2, marking a major step toward improving accessibility, reliability, and affordability
of public transport in Moray.  Specifically, the route services the Burghead,
Hopeman and Lossiemouth areas.  This flagship initiative was designed to fill
critical gaps in connectivity for health services, childcare provision, and
employment access. Since its launch, the service has completed over 2,800
passenger journeys, demonstrating strong demand and immediate community
impact. 
The planning process involved route modelling, stakeholder engagement, and
policy alignment, ensuring the service was sustainable and responsive to local
needs. Collaboration with Moray Council’s Employability Team and childcare
providers helped shape the service to reduce transport barriers for working
families. 
Key highlights of the opening months of the service are: 
Immediate Uptake: Over 2,800 journeys in the first five months.
Cost Savings for Families: The service is addressing barriers to accessing pre
and after school care. Since launch, it has supported 1,819 pupil journeys,
enabling families to access childcare and out-of-catchment school transport to
Hopeman Primary.
Social Impact: Improved access to childcare and health services, enabling
parents to maintain employment and reducing financial stress during the cost-
of-living crisis.
Policy Support: Aligns with priorities to reduce car dependency, promote
economic activity, and enable access to essential services. 
Supportive comments on the introduction of the service include: 
“m.connect has made
a substantial
difference to the
amount we spend on
transport each term
to send our children
to school. Without
this m.connect service
we may have had to
consider whether
both my wife and I
could continue to
work full time.”
“The m.connect bus
service has meant we
now have access to
affordable wrap-
around childcare
when we need it. This
has allowed me and
my husband to
continue working
from home, knowing
that the children are
happy and safe.”
“We are delighted
with the new
m.connect service
which is a great
saving on the
previous bus service
and allows for more
flexibility by not
having to pay for a
whole term in
advance.”
Page 105

Page 106

Project summary 
A key characteristic of Moray is that it has over 3,000 small and medium sized
enterprises. This represents a considerable growth potential if these businesses
can be helped to scale-up.  Supporting upskilling needs and growth aspirations, the
Business Enterprise Hub (BE Hub) will be a flexible space for business innovation
that is accessible to businesses and students alike, providing an inspirational
environment that encourages entrepreneurial thinking.  It will be a: 
Productive environment where learning spaces and real work environments
coincide.
Flexible space that seeks to drive collaboration between students, lecturers,
researchers, and practitioners.
Co-located space that will support Moray’s future entrepreneurs and their
workforce to develop. 
The project’s investment objectives are therefore: 
To improve business resilience, increasing the average business survival rate for
SMEs in Moray to 67% at 36 months in business by 2034 (according to ONS
figures).
To support 450 Moray-based SMEs to scale-up and achieve growth of 20% or
more in either employment, turnover, or social outcomes (dependent on
business model) year-on-year for at least two years, by 2036.
To attract, retain and develop skilled talent in the region so that the average
wage for full-time workers in Moray increases towards at least the Scotland
average, and the percentage of the population with NVQ3-and-above and NVQ4-
and-above qualifications increases towards at least the Scotland average by
2034.
14
Value Capital:  £4.45m:  £3.3m SG, £1m HIE, £0.15m Pride in Place
funding  
Revenue: £3.35m:  £2m SG, £0.75m UHI, £0.6m Pride in Place
funding 
Lead Body UHI-Moray
3.2.2 Business Enterprise (BE) Hub
Current status Team working to resolve final UHI Moray Board conditions
prior to entering delivery, estimated Q4 2025/26.     
Project vision Provision of education, research, and business support
functions to support new business start-ups, whilst helping to
upscale existing micro businesses.
Page 106

Page 107

15
To deliver at least 10 projects exploring entrepreneurship, business support
systems and digital capability in rural settings by 2034, contributing to
knowledge and innovations that can be applied in similar and analogous,
international environments. The proposed split would be 50/50 men/women
aimed at reducing the gender gap in STEM fields, with a focus on inclusivity
throughout. 
Collaboration is key to the BE Hub project, aiming to bring local business support
agencies along with UHI Moray and the wider UHI network together to work in
partnership under one roof, providing a joined-up offer that is responsive to local
business need. It is also collaborative in that it aims to develop a co-productive
delivery model that utilises the real-life business experience and expertise in the
region and beyond, involving established entrepreneurs in the design and delivery
of training programmes. 
Achievement made during 2024 
Full Business Case (FBC) approval 
The BE Hub  Full Business Case received formal approval by the MGD Programme
Board and from the Scottish and UK Governments in February 2025.  Delivery will
commence once all UHI Moray Board conditions are met, with a primary focus on
the BE Hub Commercial Review. 
Confirmation of balance of revenue funding
In April, confirmation was received from the Elgin Pride in Place Board for £0.15m
in capital and £0.6m in revenue funding to support the BE Hub.  Combined with an
additional revenue contribution from UHI, the project now has a fully funded
operating model that supports the stand up and stabilisation of the service. 
Service recruitment
A recruitment review is underway in advance of the delivery phase.  Two critical
roles, the Academic Lead and Commercial Innovator, are embedded in the revenue
profile and will be appointed once delivery begins. From September 25, the UHI
Moray Deputy Principal took on the role of Academic Lead role in the interim with
a key aim to develop the Curriculum Plan for the BE Hub.  To build capacity during
the pre-operating phase (with these due to be expanded following the Hub’s
launch). 
A supply bank of lecturers and trainers is being established, starting with
expertise in Entrepreneurship and Innovation.   
A pool of Research Assistants with specialist skills has been created to support
research projects under the supervision of Research Fellows to advance
research and knowledge exchange activities in this field.   
Page 107

Page 108

16
Milestone 
Commercial Phase
complete 
RIBA Stage 4 sign-off 
Formal Project
Delivery 
BE Hub Construction
Start 
BE Hub brand
development 
BE Hub Pre-
Operating Phase 
BE Hub opening 
Due Date 
Q4 25/26 
Q4 25/26 
Q4 25/26 
Q1 26/27 
Ongoing 
Ongoing 
Q3 27/28 
RAG* RAG comment 
Dependency on Housing
Mix Delivery project to
work with Robertsons
(Property) Ltd to secure a
Registered Social Landlord
(RSL) for the site.   
This will occur on
completion of the above
two milestones. 
Linked to completion of
the above milestone. 
Provisional date,
dependant on
construction start date
Curriculum development
Curriculum development for the BE Hub has begun within UHI’s Centre for
Business Enterprise and Innovation and will accelerate during formal delivery. The
Hub will offer CPD opportunities from short courses to doctoral-level study,
including leading UHI’s first professional doctorate (a Doctorate in Business
Administration - DBA). 
2026 milestones 
* Risk rating – red, amber, green
Page 108

Page 109

17
Risks and issues that require management during 2026 
Business Ent
Effect on the project 
Fixed price contract 
cannot be agreed until
the commercial phase
is complete and RIBA
stage 4 design signed
off.   
This has put a further
delay on the integrated
project sign off and a
delay on to the start of
the BE Hub
Construction phase. 
Mitigation 
RIBA 4 design due to
be finalised late in Q4
2025/26.  This will
result in s a fixed
price development
agreement with the
build contractor.   
All parties working to
secure a new RSL and
complete legal
documents.   
Target date
for resolving
the entry 
Q4 25/26 
Q4 25/26 
Risk or issue 
Risk:  Capital
budget
allocation:  Build
cost higher than
capital budget in
place for the
project. 
Issue: 
Withdrawal of
RSL for the
South Street
Housing Mix
project.
Page 109

Page 110

Focus on…. Business Enterprise Hub’s curriculum
development 
As the Business Enterprise Hub (BE Hub) transitions toward formal project delivery,
curriculum development has commenced within the UHI Centre for Business
Enterprise and Innovation.  While unforeseen delays on the wider South Steet site
have slowed physical progress, they have not entirely prevented the process from
starting.  Planning for development is underway and will accelerate once formal
delivery begins and revenue funding becomes available. 
The current flagship Continued Professional Development (CPD) course,
Responsible Leadership and Management for Contemporary Business, is now in its
sixth cohort.  Comprising three Level 8 modules, it targets business managers and
leaders seeking to develop ethical and sustainable leadership skills.  Co-designed
with a globally focused business partner, the course covers project management,
finance, staff motivation, organisational performance, and leadership theory.  Our
intention is to build on the success of the CPD programme, developing additional
modules and awards that focus on subjects such as the circular economy, and data
analytics & AI. 
Learning in the BE Hub will encompass a full range of continuing professional
development (CPD) opportunities, from 1-day CPD courses to doctoral-level study. 
UHI does not currently offer professional Doctorates, however the BE Hub will
drive forward such a development, working to establish a Doctorate in Business
Administration (DBA).  A UHI working group has been formed, and initial approval
documentation is in progress.  Led by the BE Hub Academic Lead, this will follow a
framework approach, enabling future expansion into sectors such as Engineering,
Education, Health, and Gaelic Studies.   
18 Footnote:  At the time of finalising this report (May 2026) the Business Enterprise
Hub project has entered delivery, with agreements relating to the South Street site
having now been agreed. 
Page 110

Page 111

Project summary 
The Cultural Quarter (CQ) project is regenerating two iconic, category B listed
buildings:  Elgin Town Hall (Phase 1) and Grant Lodge (Phase 2), both of which are
in Elgin.  The  aim is to create new spaces for recreation, community, culture,
heritage and tourism, acting as a catalyst for inclusive, place-based cultural
regeneration. Putting local people at the heart of these developments, whilst
increasing the region’s attractiveness as a place to visit, work and relax, the project
will drive inclusive economic growth and cultural expansion within the city and
wider region. 
These vibrant new spaces will act as a springboard for cultural place-based
regeneration, providing opportunities for local people and visitors alike. The aim is
to enhance Moray’s cultural and evening economy, increase tourism, attract/retain
young people and talent/skills, and support the sector to thrive and grow. 
The creation of modern fit-for-purpose venues and a visible, aspirational cultural
centre in Elgin will encourage private sector investment in a new hotel at a
complementary site (Phase Three), meeting a longstanding requirement for
additional, quality, hotel accommodation in Moray. 
The MGD is fully funding Phase 1 and seed funding Phase 2 through significant
investments from the Scottish Government, the UK Government, Highlands and
Islands Enterprise (HIE) and Moray Council. External support for Phase 2 has been
pledged or is in a second phase of ratification / approval from Historic Environment
Scotland (HES), Elgin Pride in Place Board, Regeneration Capital Grant Fund (RCGF)
and the National Lottery Heritage Fund.  If all phase 2 applications are successful,
then the funding gap will have narrowed to £2.25m, with further work to be
advanced during 2026 to secure further financial support.   
19
Value £28.9m with £24.45m of funding secured.
(Capital:  £12.84m SG, £4.1m UKG, £2m HIE, £3.9m Moray
Council and £1.65m from other funders) 
Lead Body Moray Council
3.2.3 Cultural Quarter
Current status In delivery.  Phase 1 construction underway.  External funding
to support phase 2 in progress 
Project vision Investment in key local heritage assets, including the
refurbishment of Grant Lodge, Elgin Town Hall, and
investment in the region’s culture and tourism infrastructure
designed to leverage private sector investment in a new hotel. 
Page 111

Page 112

The project prioritises collaboration and community consultation and has been
developed in partnership with a wide range of stakeholders. These include: Elgin
Town Hall for the Community, Grant Lodge Trust, HIE, HES, Visit Scotland, Creative
Scotland, The Macallan Estate and the Third Sector Interface (TSI) Moray – who sit
on the project board and working group.  Additionally, the project works with a
group of Culture and Heritage and training / education partners including: Elgin
Museum, Elgin Cathedral, Elgin Library, Moray: Arts Development and Engagement,
Out of the Darkness Theatre Company, The Cabrach Trust, UHI Moray, Moray
School of Art, and Moray Pathways. 
Phase 1, Elgin Town Hall, is fully funded and works have started on site, due to
complete in Q1 27/28. The aspiration is to deliver phase 2, Grant Lodge, between
2027 and 2029. The realisation of phases 1 and 2 will leverage interest and
investment in the proposed third phase, the creation of a new town centre hotel in
Elgin. 
Achievements made during 2025 
Phase 1:  Elgin Town Hall 
Elgin Town Hall for the Community (ETHC) decanted to Elgin Community Centre 
Principal Contractor, Taylor & Fraser, appointed to lead the redevelopment and
extension works at Elgin Town Hall.  Work commenced on site late 2025. 
Phase 2:  Grant Lodge 
Moray Council Councillors approve the Cooper Park and Grant Lodge Trust
Deed Variation petition, now underway
Cultural Quarter phase 2 working group established to support Moray Council
and Grant Lodge Trust to progress proposals and operational model for Grant
Lodge 
Grant Lodge Business Plan updated, with external funding either secured or
progressing to a second phase of review from Historic Environment Scotland,
Regeneration Capital Grant Fund, National Lottery Heritage Fund, and Elgin
Pride in Place Board 
Grant Lodge RIBA Stage 3 report complete and planning, listed building consent
applications lodged 
Project wide activity
Record attendance to Cultural Quarter buildings as part of Doors Open Day
2025
Cultural Quarter Project Manager gave a presentation and was a panel
participant in the  ‘Town and City Centre Regeneration: Re-imagined’ workshop,
part of the Scotland’s Towns Conference 2025 
20
Page 112

Page 113

21
2026 milestones 
Milestone 
Grant Lodge
planning and listed
building consent in
place 
Grant Lodge RIBA
stage 4 commences 
Moray Culture and
Heritage Network
established 
Cooper Park Trust
Deed Variation
Approved 
Grant Lodge
Construction Tender
issued
Due Date 
Q4 25/26 
Q1 26/27 
Q4 25/26 
Q2 26/27 
Q3 26/27 
RAG* RAG comment 
Applications have been
approved. 
Subject to permission
from funders 
Funding and partners in
place, subject to
permission from funders 
Petition drafted, aims
align with original Deed of
Gift 
Subject to funding and
approval from Moray
Council
* Risk rating – red, amber, green
Page 113

Page 114

Risks and issues that require management during 2026 
22
Elgin Town Hall aerial view proposal
Picture courtesy of LDN Architects
Effect on the project 
The project is now
phased with phase 1
fully funded.  Phase
1cost increases and
failure to secure
sufficient external
funding could mean all
or part of phase 2
cannot be delivered. 
May cause activity to
be curtailed / ceased,
which could impact our
ability to achieve the
outcomes desired.  
Mitigation 
Work continually with
stakeholders to
deliver a successful
capital funding
campaign; work with
QS and design teams
to manage costs /
assess value
engineered options,
consider phasing;
analyse proposals
against deliverables
at key strategic
gateways 
Sub-group
established for
each phase to
manage
transitions,
operational/organi
sational
development
requirements and
revenue /
development
fundraising
Work with TSI
Moray and Culture
and Heritage
Network for peer
support and skills
sharing
Develop Action
Plans with HIE, TSI
and CSU 
Target date
for resolving
the entry 
Q3 25/26 
Ongoing 
Risk or issue 
Issue:  The
available budget
through MGD
investment is
not adequate to
renovate both
buildings and
additional funds
must be
secured. 
Risk:  Inability to
achieve revenue
profiles as set
out in the full
business case /
business models
that have been
developed.   
Page 114

Page 115

Focus on… preparation and start onsite at Elgin
Town Hall 
During 2025 the project team worked with Elgin Town Hall for the Community, HIE
and LDN Architects, to transition the Town Hall from an operational community
facility to the commencement of major capital works to secure its future as
Moray’s leading arts and entertainment venue. 
In March 2025 major shows at Elgin Town Hall ceased and the charity Elgin Town
Hall for the Community relocated to Elgin Community Centre where they continue
to support community activities / small scale events for the duration of the capital
works. The contract for works at Elgin Town Hall was published via open tender. 
Following Elgin Town Hall for the Community’s relocation from the Town Hall the
project team undertook essential building investigations such as full demolition
and refurb asbestos surveys to plan for the works, and coordinated with SSEN to
relocate underground cabling that would have caused complications in the area
where foundations are due to be laid for the studio extension. The project team
then led a detailed Town Hall inventory review, ensuring everything needed for the
building re-opening is safely stored, and disposing of items which will no longer be
required. 
In July 2025 the project team appointed Taylor and Fraser as our main contractor
to redevelop, extend and re-imagine Elgin Town Hall.  A period of early contractor
engagement was initiated allowing our design team and professional advisors to
work with the contractor and agree final details and costings for elements of the
design. The aim is to reduce overall risk in the contract. 
Moray Council signed the contract with Taylor and Fraser in October 2025, and the
contractor has now taken occupation of the site and construction activity has
commenced. 
23
Page 115

Page 116

Project summary 
The Rural Centre of Excellence (RCE) is a £5M UK Government–funded project
delivered by the Digital Health & Care Innovation Centre (DHI) as part of the Moray
Growth Deal. It aims to:  
Build a rural focused digital health and care research and development (R&D)
ecosystem to drive economic growth
Develop scalable digital solutions addressing national health and care
challenges
Influence academic and workforce development to meet future digital skills
needs 
The RCE, in partnership with Health and Social Care Moray (HSCM) and citizens
with lived experience, is developing and testing innovative digital solutions to
support health, wellbeing, and independent living in rural communities. These
solutions aim to address service capacity challenges in Moray, with the potential
for national and international adoption, positioning the region as a leader in
shaping future health and care delivery. 
You can find out more about us and our work in Moray here: 
www.dhi-scotland.com/rce-moray-hub  
24
Value £5m (Capital:  £5m UKG) 
Lead Body Rural Centre of Excellence (RCE) for Digital Health and Care
Innovation
3.2.4 Digital Health
Current status Project in delivery and at an advanced stage.  Due to compete
in July 2026. 
Project vision Creation of an anchored demonstration and simulation
environment (DSE) and Living Lab testbeds for the Moray
region.
Page 116

Page 117

The project consists of a series of ‘living labs’, which are focused periods of work to
develop digital applications for specific health care relates issues.   
25
Stakeholder involvement is central to the success of the RCE. The Digital Health &
Care Innovation Centre (DHI) leads delivery in partnership with H&SCM, NHS
Grampian clinical teams, Moray Leisure Centre, and Quarriers Moray Carers
Service. Universities and colleges, including UHI Moray, contribute
academic expertise, while citizens and community organisations provide lived
experience to ensure solutions are relevant and inclusive. Industry partners further
support innovation and scalability, creating a collaborative ecosystem that drives
meaningful change for health and care in Moray.  
Number 
1
2a 
2b 
3
4
5
Title 
Supported self
management 
Long term condition
management 
Community
Occupational
Therapy (OT) 
Care in place 
Smart housing /
communities 
Mental wellbeing 
Tackling obesity through preventative
approaches, connecting citizens to tailored
information and support to reduce risks such
as high blood pressure and type 2 diabetes. 
 
 
Supports people with type 2 diabetes to stay
well by connecting them to the right services
at the right time. 
Addresses long waiting times for OT
assessments by developing tools to support
selfmanagement and quicker access. 
Testing Community Connections Moray and
personal data store with unpaid carers in
Forres and Lossiemouth. 
Developing proactive Technology Enabled Care
(TEC) using sensors and data analysis to detect
early changes and reduce hospital admissions. 
Expanding mental health resources and digital
bundles to Community Connections Moray
and testing eMoodie – an early detection
platform with staff.    
Living Lab Area of Focus
Page 117

Page 118

Achievements made during 2025 
Living lab digital development
Over 20 research and development (R&D) simulations have been progressed to
date
2 core infrastructure assets are being tested in Moray (community connections
and the personal data store), with further investment and R&D activity in 2
other Scottish Health and Social Care Partnership (H&SCP) 
5 living labs have been activated and are at various stages of the innovation
process
1 R&D pathway has transferred to business as usual nationally through the right
decision service 
4 micro credential modules titled digital essentials for carers have gone live via
UHI Moray, with a further 4 currently being developed
A project has been initiated to develop a digital blueprint of international
significance for future smart homes, incorporating design, construction and
digital in partnership with Build Environment-Smarter Transformation Scotland
(BE-ST) and HMD 
Economic development activity
Over £2m in R&D additional funding directly leveraged into Moray. 
At least 12 new jobs to date have been activated due to the RCE R&D activity. 
26
Page 118

Page 119

27
Milestone 
Deliver health &
care, economic, and
skills KPI’s as per FBC 
All 5 living labs to be
tested and
evaluated, with
readiness for
adoption and scaling
progressed 
Pipeline of
training/upskilling
modules to be
delivered   
MGD funded phase
of RCE to be
completed 
Due Date 
Q2 26/27 
Q2 26/27 
Q2 26/27 
Q2 26/27 
RAG* RAG comment 
Economic impact is
expected to continue to be
realised over the life of
the MGD, and once the
RCE funded phase assets
move towards adoption
and scale   
All currently progressing
to timelines with business
cases being developed by
Heath and Social Care
Moray for core assets. 
Progressing to timelines 
Current MGD project end
date, however a
sustainability plan is being
progressed to enable the
RCE and living lab R&D
activity to continue as a
long term asset for Moray
2026 milestones   
* Risk rating – red, amber, green
Page 119

Page 120

28
Risks and issues that require management during 2026 
Figure 2: Professionals Pathway
Effect on the project 
It has become evident
that over the last 2
years the Universities
and Colleges in
Scotland are financially
constrained which is
making it harder to
create spin out
companies, which
could impact on
economic KPIs 
As a small local
authority, there is
limited economic
development capacity
available to fully
support this, but
collaboration is taking
place between key
partners to support
requirements around
local SME growth,
creating business start
up opportunities, and
attracting inward
investment in terms of
job creation in the
region.
Mitigation 
RCE will use the
Health Frontiers
project to assist in
developing a stronger
network of support
for start-up and spin
out companies over
the remaining period
of the MGD
timeframe (up to
2031), in addition to
the BE Hub to
support these and
SME growth. 
An experienced local
consultant has been
contracted to create
and initiate a
roadmap to develop
an industry cluster
ecosystem in the
region. A local
oversight group will
be stood up to bring
key Moray
stakeholders
together to support
its implementation
and facilitate a series
of local events.
Target date
for resolving
the entry 
Ongoing 
July 2026 
Risk or issue 
Risk to RCE
economic KPI
achievement
due to limited
start-up/spin out
opportunities
with colleges
and universities 
Risk to RCE
economic
development KPI
achievement
due to limited
economic
agency support
in the region 
Page 120

Page 121

29
Focus on… Living lab 1 (supported self
management) and living lab 2 (long term
condition management) pilot activity 
The focus section for this year is on Living Lab 1 (supported self management) and
Living Lab 2 (Long term condition management), specifically work taking place
within Moray Leisure Centre.  The piloting of the digital applications has led to
further R&D funding for 7 pathfinder projects across Scotland, ahead of the
multimillion national obesity funding that is being positively progressed (DHI has
been selected for interview).  These positive outcomes have arisen from the
approach developed and tested at Moray Leisure Centre with the main features
being: 
Creation of the heart of Moray wellness community in partnership with NHS
Grampian and the leisure industry
Targeted comms has attracted an at-risk community into a wellbeing service
with a focus on early intervention and prevention i.e. those with a high BMI, and
at risk of type 2 diabetes 
Successfully testing the concept of citizen willingness to financially invest in their
wellbeing through leisure centre membership 
Technical infrastructure allows user data to be collated via the community
connections app such step count, calories consumed etc., Recent technical
developments to be tested in the next phase include a leisure centre and a
clinical NHS interface that enables access and interaction between the service
and the user through consented access via the PDS 
Brings additional capacity to support with management, and directs finite
clinical services to those most in need with staff and user efficiencies and
satisfaction enabled through asynchronous capabilities 
Creates a new revenue stream and jobs for the leisure industry 
Page 121

Page 122

Project summary 
The Early Years STEM project will invest £6.4m in STEM education in Moray, with
Moray Council committing £2.9m (£1.3m in capital and £1.6m in revenue), and the
Scottish Government committing £3.5 million (capital). 
The project aims to encourage young people to enter a STEM related career when
they leave education through focusing on STEM engagement with children in their
early stages of learning (age 3-8). The project will develop a STEM learning
ecosystem in the Moray area, through the creation of specialist learning
environments and experiences, access to training and resources, and the creation
of a learning network involving key delivery partners, upskilled staff, and
volunteers from industry and the wider community. 
Early Years STEM aims to inspire and enhance the learning experience of children
and staff through age appropriate, curriculum aligned and industry related STEM
experiences.  It will also ensure the offering is accessible to parents, employers,
and the wider community, thereby allowing inter-generational learning to take
place. The aspiration of this strategy is to close the equity gaps in participation and
attainment in STEM, leading to more young people choosing STEM occupations at
a later stage in their lives.   
30
Value £6.4m (Capital:  £3.5m SG, £1.3m Moray Council.  
Revenue:  £1.6m Moray Council) 
Lead Body Moray Council
3.2.5   Early Years STEM
Current status Full business case approved during Q3 24/25 and the project
has entered delivery.  RAG is due to the construction activity
and the associated financial draw down likely to slip from
24/35 FY into 25/26024. 
Project vision To raise the aspirations of children age 3-8 in Science,
Technology, Engineering and Maths (STEM), and to grow the
STEM talent pipeline to ensure Moray is resilient in the future.
Page 122

Page 123

31
State-of-the-art STEM learning centre hosted within Elgin
library.
Mobile facility fitted out with equipment that can be
transported to and used in any suitable venue.
Outreach offering, consisting of a repository of STEM
resources.
Comprehensive learning programme aligned to the
Scotland’s Curriculum for Excellence. 
Two satellite STEM hubs in the west and east regions of
Moray, to enhance the reach of engagements.
Environmental sciences and outdoor STEM learning
centre, developed and delivered in partnership with a
local environmental charity and focusing on learning for
sustainability. 
STEM Grant Scheme to support partnership activity and
community focused STEM programmes.
Budget to update and refresh equipment.   
Phase 1 (2024
to 2025) 
Complete 
Phase 2 (2026
to 2028) 
Phase 3 (2029
to 2031)
The project will deliver a comprehensive package of investment that includes: 
Page 123

Page 124

Achievements made during 2025 
Service mobilisation 
STEM Starts brand has been launched, to provide clear signposting of what the
project offering is.
STEM Starts Discovery Centre, Elgin (adjacent to Elgin Library) has been
completed, with nursery and school visits due to commence in early 2026.  
Outreach van has been delivered and branded.  Activity has begun to lend STEM
kits and play equipment, purchased through the project, to early learning and
childcare settings within Moray.
The STEM starts website has been created, with a planned go live date of early
2026. 
Staff recruitment 
Recruitment of a STEM starts Development Manager has been completed, who
will lead the delivery of STEM starts learning activities in Moray (recruitment of
further STEM starts staff will follow in early 2026. 
2026 milestones  
32
Milestone 
Phase 1 
Launch STEM Starts
website
Launch of STEM
Starts Learning
Network
Expansion of STEM
starts Mobile
Outreach Service
Opening of STEM
Starts Elgin Hub to
schools, ELC settings
and community
groups
Operating model
finalised 
Phase 2 
Feasibility planning
Due Date 
Q4 25/26 
Q4 25/26 
Q4 25/26 
Q4 25/26 
Q2 26/27 
Q1 26/27
RAG* RAG comment 
These activities have all
been completed. 
Scheduled to be delivered
by the new EY STEM
Manager.   
Evidence gathering
underway
* Risk rating – red, amber, green
Page 124

Page 125

33
Risks and issues that require management during 2026
Effect on the project 
Inability to realise
outreach and centre
activities. 
Project delay or failure
to deliver phase 2
developments as
planned 
Improvements in STEM
attainment levels not
realised. 
Potential to impact the
outcomes and benefits
of the project.
Mitigation 
Make activity attractive
to funding
opportunities 
Grow STEM
partnerships
Develop a network:
volunteers and
industry 
Engage legal
support at an early
stage 
Develop
partnership
agreements.
Engage community
early and ongoing 
Identify barriers to
participation 
Flexible and
dynamic approach
to curriculum
development and
project delivery.
Ongoing
assessment of skills
need with
education staff,
young people 
Map STEM centre
locations and
schools within
Moray.  
Incorporate
findings as part of
shaping phase 2
deliverables and
milestones 
Target date
for resolving
the entry 
Q4 27/28 
Q3 26/27 
Ongoing 
Ongoing
Risk or issue 
Risk: Insufficient
operational
planning and
budgets.   
Risk:  Inability to
acquire sites or
secure strategic
partnerships 
Risk:  No change
in community
attitudes or
regular repeat
visitations to
STEM centre
infrastructure. 
Risk:  Cost of
transporting
children and
carers / teaching
staff to centres
make trips
prohibitive 
Page 125

Page 126

Focus on… STEM Starts Learning Network 
STEM Starts helps young children explore Science, Technology, Engineering, and
Mathematics through engaging, age-appropriate experiences. Early exposure to
STEM fosters curiosity and builds strong foundations for future learning, increasing
the likelihood of success in these subjects. This approach opens diverse career
pathways and equips children with the confidence and skills to solve real-world
challenges. 
The STEM Starts learning network is a collaborative way of working, with the child
at the centre of it all, and is made up of the following elements: 
Dedicated STEM Centres offering interactive, hands-on activities for children. 
Mobile Outreach Service bringing STEM experiences to communities across
Moray. 
STEM Lending Library providing kits and play equipment for schools, ELC
settings, and community groups.
STEM Learning Programme with curriculum-aligned lesson plans, resources, and
training videos for educators. 
Family Engagement initiatives encouraging parents to support STEM learning
through play and exploration. 
Specialist STEM Coordinators to lead activities, assist educators, and train
volunteers. 
Partnership working with local community groups, libraries, and charities to co-
create STEM learning experiences. 
Industry Collaboration to shape STEM learning opportunities and prepare young
people for future careers. 
34
Page 126

Page 127

35
Value £7.5m (Capital: £5m SG, £2.5m Moray Council) 
Lead Body Moray Council
3.2.6 Housing Mix Delivery
Current status The full business case was approved during Q4 23/24 and the
project has entered delivery. 
Project vision Stimulating housing development in town centres, unlock
constrained sites and promote the integration of pilot
exemplar sustainable design and construction techniques.
Project summary 
The Housing Mix Delivery is a £7.5m project with a commitment of £5m from the
Scottish Government and £2.5m from Moray Council. The project will support the
delivery of: 
At least 360 affordable houses and plots
150 short-term construction jobs annually
Private housebuilding by reducing constraints that will enable the construction
of at least 500 market houses
Brownfield site regeneration
Provision of housing in rural towns and villages 
Speyview, Aberlour
Page 127

Page 128

36
Achievements made during 2025 
South Street, Elgin
Enabling works started on the 6 Jan 2025 and all five buildings have now been
demolished. 
All ground conditions are now established, archaeological evaluations complete
and initial drainage work undertaken.
During the demolition, items from well-loved Elgin venues were saved such as
the Newmarket bar sign, the McEwan’s Sign and the Jailhouse Nightclub electric
chair. These items were put up for auction by Robertsons Property Limited with
all £1649.18 of the proceeds going to Elgin Children’s ward. 
Dallas Dhu, Forres
Planning approval granted in March 2025 and lead developer agreed. 
Hillside Farm, Dufftown
Masterplan complete. 
Speyview, Aberlour
Construction underway with 30 units due for completion in Jan 2026, 9 units due in
March 2026 with phase 2 completion forecast for 2027. 
2026 milestones   
Milestone 
South Street, Elgin:
Construction to
commence. 
Dallas Dhu, Forres:
Construction to
commence. 
Dallas Dhu, Forres:
Housing Innovation
Area Planning
Permission granted.  
Speyview, Aberlour:
Delivery of 39
affordable homes   
Identify sites for
phase 2
Due Date 
Q1 26/27 
Q4 26/27 
Q4 26/27 
Q4 25/26 
Q3 26/27
RAG* RAG comment 
Subject to a new
Registered Social Landlord
signing up to the project. 
Subject to costing and 
legal documents signed. 
Design and planning work
underway. 
Construction underway. 
Early investigations
underway.
* Risk rating – red, amber, green
Page 128

Page 129

Focus on… Dallas Dhu housing innovation area 
The broader Dallas Dhu project is an innovative collaboration between Moray
Council and Altyre Estate, with Grampian Housing Association and the Glasgow
School of Art.  Fraser/Livingstone Architects were awarded the contract in 2023 to
design phase one of the Dallas Dhu housing development. This consists of 24
affordable homes, 40-bed student accommodation, custom build housing
opportunities (4 serviced plots) and a housing innovation area. 
Moray Council is taking lead on the housing innovation area, made up of 6 plots set
within the site. The aim is to create a new neighbourhood of homes knitted into the
immediate landscape setting, that helps to foster a renewed sense of community and
belonging.  The primary ambitions for the housing innovation area are: 
Localism:  Seeking to source as many materials as possible from the local area
and using local suppliers wherever possible.
Materials:  The project aims to use locally sourced timber (if possible, from
Altyre Estate) and more broadly, try to build the homes without using any
concrete or cement or plastics/polythene layers that are now so prevalent in
modern construction, by using natural bio-based materials wherever possible.
Affordability:  The intention is to deliver the two homes based on the “average
price” for the Moray area and the remaining plots will be sold as serviced plots. 
Work is currently underway on the mini masterplan for the housing innovation
area which will be submitted for planning approval in 2026. 
37
Risks and issues that require management during 2026 
Effect on the project 
Delay to the construction
start date until a new
RSL is confirmed. This
has a knock on effect to
the start date of the
Business Enterprise Hub. 
Opportunities and
benefits unable to be
realised. 
Mitigation 
Discussions are
progressing with new
RSL partners, with
confidence a new
partner can be
onboarded.   
Continued close
working with DHI to
incorporate
ambitions into HMD
Phase 2 sites and
other projects being
developed. 
Target date
for resolving
the entry 
Q1 26/27 
Q3 26/27 
Risk or issue 
Issue: The
Registered  Social
Landlord (RSL) for
South Street pulled
out of the project
in late 2025. 
Risk: Outputs from
the DHI Smart
Housing Living Lab
are unable to be
accommodated in
the Dallas Dhu
project.
Footnote:  At the time of finalising this report (May 2026) , agreement has been
secured for a new Registered Social Landlord (RSL) to partner on the South Street
site. 
Page 129

Page 130

Project summary
Opening in early 2026, the Manufacturing Innovation Centre Moray (MICM) will
build on Moray’s manufacturing strengths, providing a hub for support and advice
to companies locally and across the Highlands and Islands. 
MICM will function as a focal point for manufacturing businesses, providing
assessment and diagnostics of business need, advice, information, signposting and
brokerage, along with routes to various funding and finance sources. Its primary
focus will be on stimulating innovation and growth in product and process
development, with a strong emphasis on transitioning to low carbon practices.  It
will: 
Play an active role in advanced manufacturing (multi-sector)
Provide services that are customised to the needs of rural manufacturing
businesses
Support manufacturing businesses to develop detailed assessments and
baselines of productivity and net zero performance
Co-ordinate service delivery and guide/steer businesses to the best solution for
them and the most suitable providers (for example the National Manufacturing
Institute for Scotland, NMIS, Scottish Manufacturing Advisory Service, SMAS,
Interface, Business Gateway, and other service providers) 
Support businesses to innovate their processes and products and adopt new
technologies leading to improved productivity and profitability 
Unit 9 at Enterprise Park Forres has undergone a construction refurbishment
throughout 2025 to transform it into a state-of-the-art manufacturing innovation
centre. The new hub includes: 
Incubation space for start-up and young businesses
Demonstration facilities showcasing advanced technologies and equipment
Meeting rooms and hot desk space 
38
Value £6.859m (Capital:  £0.61m SG, £2.442m UKG, £2.557m
HIE. Revenue:  £1.25m SG) 
Lead Body Highlands and Islands Enterprise
3.2.7   Manufacturing Innovation            
Centre for Moray (MICM)
Current status In Delivery Stage.  Phase 1 services launching in 2026, with
Elevator UK appointed as the service operator.   
Project vision A focal point for manufacturing businesses to learn best
practice and collaborate to stimulate the creation of new
processed, products and growth of existing manufacturing
businesses throughout Moray.
Page 130

Page 131

39
In October 2025, HIE appointed Elevator UK as the MICM service operator, to
design and deliver the operational activity.  Elevator has entered a 6-month
mobilisation and business consultation phase, with full-service launch planned for
spring 2026. 
The MICM project continues to be on track to realise the following key objectives: 
To increase Business Enterprise, Research and Development (BERD) in Moray’s
current manufacturing companies.
To increase growth, productivity, and efficiency in Moray’s manufacturing
companies.
To increase the number of manufacturing start-ups in Moray.
To attract manufacturing inward investment to Moray.  
Achievements made during 2025 
Knowledge sharing 
In January 2025, a MICM learning and best practice visit took place to the
following three Somerset Council Innovation Centres:  
o Firepool Centre for Digital Innovation (FCDI)
o The iAero Centre - aerospace and associated high-value design and
engineering technology.
o Somerset Energy Innovation Centre (SEIC) 
Construction   
Capital construction work on the MICM hub completed. 
Service stand up 
MICM Service Operator procurement undertaken from April to Sept 2025 
MICM Service Operator contract awarded to Elevator UK, and commenced Oct
2025 
Facility Management contracts awarded throughout summer/autumn 2025 
2026 milestones 
Milestone 
MICM Service
commences 
Due Date 
April 2026
RAG* RAG comment 
Elevator appointed as
Service Operator, working
through mobilisation plan  
On 
track
* Risk rating – red, amber, green
Page 131

Page 132

Risks and issues that require management during 2026 
40
Effect on the project 
Could result in a
revenue shortfall for
the project, reducing
the project viability
long term 
Impacts the range of
equipment and
software able to be
purchased 
Vision for MICM
diverges from what the
business community
would like to see.
Mitigation 
Evaluated by
sensitivity analysis in
FBC - impact at <20%
is regarded as
moderate. 
Will be monitored
and reviewed
throughout delivery
stage 
The equipment
strategy is currently
being developed by
Elevator with support
from HIE, it is
expected to focus on
equipment and
software to support
digitisation. Work is
ongoing to identify
elements of
equipment related
spend that can be
capitalised. 
Consultation events
with the Moray
Growth Deal partner
organisations,
Chamber of
Commerce and
ongoing programme
of sector/subject
events.  MICM Project
Board to continue to
have cross sectoral
private sector input.
Target date
for resolving
the entry 
Review early
26/27 and
ongoing
throughout
project term 
April 2026 
Ongoing
throughout
Project term 
Risk or issue 
Risk: Revenue
assumptions in
the financial
model  are over
optimistic 
Issue: The
equipment
budget is capital
only. There is a
risk that
elements of
equipment and
technology
acquisitions
such as software
cannot be
capitalised 
Risk: Lack of
productive
engagement
with the
business
community.
Page 132

Page 133

41
Focus on… the successful appointment of Elevator
UK as the MICM Service Operator 
In 2025 MICM successfully met its milestone to appoint a Service Operator to
design and deliver the MICM service. 
To ensure the service was designed appropriately and to reach a successful
procurement outcome, HIE undertook market engagement and learning through
the following routes: 
Learning visit to Somerset Council, which is delivering a network of innovation
centres and wrap-around innovation support services for businesses in
Somerset’s key growth sectors.
Prior Information Notice (PIN) on Public Contract Scotland (PCS): this enabled
HIE to evaluate the market and gather feedback and intelligence, resulting in 7
detailed responses from the market. 
The learnings gathered provided views and input into areas such as equipment
strategy, mobilisation period, length of contract, pricing structure and the service
scope.  The information then informed the development of the scope of services
tender documents for the service operator procurement. 
Procurement was undertaken throughout spring and summer 2025, with Elevator
UK successfully appointed in October 2025. 
Elevator UK is one of Scotland’s leading social enterprises for enterprise and
business support, specialising in creating opportunities for growth, innovation and
meaningful impact.  It has a nationwide reach with in-depth knowledge and
experience of the manufacturing and innovation landscape and is well connected
to networks and partnerships which will support, enhance and complement the
MICM service. 
Elevator UK is perfectly placed with the skills, experience and knowledge needed to
design and deliver the MICM service.   With Elevator having been appointed in
October 2025, it is currently working through a 6-month mobilisation plan which
consists of recruitment, business and sector engagement, service design and
devising the equipment strategy.  MICM full-service launch is planned for Spring
2026. 
Page 133

Page 134

Current status Project in development. Working to draft a strategic outline
case for the funding by mid 2026.   
Project vision To generate a vocational and academic pipeline of skills
needed to help Moray employers grow.
42
Project summary 
Skills development is a key strand of the Moray Growth Deal.  There is a desire to
create a multi-facetted pipeline of vocational and academic courses that provide
skills needed to help our businesses to innovate and grow.   
Workshops held have helped identify that any future project should support skills
development in the energy, engineering or healthcare space, with further work
expected throughout the rest of 2025/26 and then throughout 2026/27 financial
year to move a viable proposition through the business case development process
and into delivery.   
Achievements made during 2025 
Evidence gathering  
Completion of workshops to define and advance thinking on future skills activity. 
Procurement activity  
Procurement of consultancy support to review proposals and to bring a project
vision to strategic outline case stage.   
3.2.8   Skills and innovation project
Value ££21m (Capital: £21m UKG) 
Lead Body To be confirmed
Page 134

Page 135

43
2026 milestones 
Milestone 
Consultancy support
to:
Review project
proposals
Develop the
project vision
Commence the
drafting of the
strategic outline
Case (SOC)
business case
stage.   
Governance and
change control
activity regarding
approval of the
project vision and
SOC 
Aspirational target
for a full business
case to be
developed.  
Due Date 
Q4 25/26 
Qs 1 and 2
26/27 
Q4 26/27 
RAG comment 
Optimat were appointed
and have completed work
to develop the Strategic
Outline Case. 
Consideration by the MGD
Programme Board, Moray
Council, Community
Planning Board, Scottish
Government and UK
Government.   
Further clarity and
confidence required
regarding whether this is
a feasible aspiration once
the lead partner (s) have
been identified.
RAG* 
On
track 
Scheduled 
Under
review
* Risk rating – red, amber, green
Page 135

Page 136

Risks and issues that require management during 2026 
44
Effect on the project 
Inability to advance a
significant strand of
the Deal, with concern
that this funding could
remain unspent.   
Service start up less
resilient
Mitigation 
Multi-partner work in
progress to develop
project proposals. 
Aim is to identify early
if there is a risk
existing proposals
cannot advance, with
a view to identifying
alternative proposals.  
Aspiration for
business case
development process
to take place during
2026/27 financial
year.   
Ongoing work with
Government funders
to determine if
revenue funding can
be sought for the
project. 
Extensive service start
up planning. 
Target date
for resolving
the entry 
Interim
milestone of
March
2025/26 to
have reviewed
proposals and
developed a
vision
statement for
the proposed
new project. 
Ongoing
Risk or issue 
Risk: Failure to
identify a
replacement
skills project for
the Deal. 
Issue: Only
capital funding
is available
Focus on… workshop process to identify a
replacement project 
The skills element of the Moray Growth Deal attracts £21m of investment from the
UK Government (all capital funding), with the aim that any project delivers not just
skills development but innovation activity as well.   
At the end of 2024 and into 2025 a workshop process was run that involved a
range of different organisations and sectors, including: 
Academic institutions who undertake activity within Moray or in close proximity
Moray Council elected members
Bodies who represent Moray businesses
Moray businesses 
Page 136

Page 137

45
Public organisations with an interest in supporting and progressing skills and
innovation activity in the region 
The workshop series was developed in conjunction with the Scottish Futures Trust
(SFT) and aimed to achieve the following:                         
Subsequently, consultancy support has been procured and work will be delivered
during Q4 2025/26 to: 
Review 2 highest ranking proposals.
Consider how other potential partners could support the project, with
discussions held with a number of academic providers following the workshop
process.  
Consider the wider strategic landscape and other partners who may be able to
support the successful delivery of Deal outcomes, with the aim of developing a
vision for how the funding should be utilised.
Developing a strategic outline case (SOC) which is the first step in the UK
Government’s Green Book methodology that Growth Deal projects need to
follow.   
Work being progressed will align with the May 2025 Regional Transformational
Opportunities report published by Highlands and Islands Enterprise and outputs
from the Moray Skills Summit held in December 2025.   
Deliverable sought 
Define the need for
investing in skills
infrastructure in Moray. 
Develop criteria against
which potential
opportunities would be
appraised 
Identify priority sectors
and potential options that
can be considered. 
Screen potential options
against criteria to identify
a prioritised list.
Outcome achieved 
Workshop attendees reaffirmed that the funding
should be allocated for skills development, given
the critical role it can play in underpinning wider
programme objectives relating to business
growth and helping to attract / retain people in
Moray.   
A series of objectives for a future skills project
were identified that focused on collaboration,
people development, economic growth, standing
of Moray and resilience.   
After reviewing a wide range of sectors, the
group identified energy, engineering and
healthcare as priority areas of focus.   
Potential proposals were considered and ranked,
with the 2 highest options recommended for
progression into a more detailed development
phase.
Page 137

Page 138

4 Programme Management Office
activity planned for 2026 
4.1 PMO milestones to be achieved 
The PMO expects to deliver the following milestones during 2026: 
46
Milestone 
Growth Deal annual conversation with the Scottish and
UK Governments 
Programme level change activity to secure approval for
the replacement skills project: 
Drafting of a strategic outline case
Secure MGD Programme Board, Moray Council and
Government approval. 
2026/27 grant offer letter to be agreed with the
Scottish Government, confirming the level of funding
to be provided during the financial year.   
Publication of the Deal’s 2025 annual report. 
New Scottish Government benefits realisation
guidance to be reviewed, with an action plan
submitted to the MGD Programme Board for approval. 
Report to Council that updates Elected Members on
progress made securing additional funding for Grant
Lodge and the outcome of RIBA 3 design stage activity,
with the aim of securing agreement on the way
forward for the building. 
Schedule of in-life reviews of project activity 
Target date 
Q4 2025/26 
Qs 1 and 2 2026/27 
Q1 2026/27 
Q1 2026/27 
Q1 or Q2 2026/27
(depending on when
guidance published) 
Q1 2026/27 
Ongoing
Page 138

Page 139

47
4.2 Factors that require action or future delivery could be impacted 
Extracted from a November 2025 risk review paper that was considered and
approved by the MGD Programme Board, the following entries were identified as
requiring focused attention during 2026:   
Risk area 
Ensuring there is
sufficient capacity in
place to deliver Deal
activity. 
Ability to meet or
exceed revenue
projections and
maximise income to
be generated by
services.   
Switch from project
management to
contract
management as post
procurement
monitoring. 
Likely that as delivery
advances, projections
in the FBC will vary
from the actual
situation (primarily
relating to time and
cost).   
Cost inflation and
pressure on capital
budgets.
Suggested mitigations for progression during 2026 
Plan to be approved by the Board for medium to
long term resourcing requirements (project and
programme activity).
Generate clarity on what is required for post
project monitoring and evaluation activity and
clarify who is responsible for undertaking this. 
Support from finance colleagues to brief relevant
projects on expectations around revenue
forecasting and reporting.  
Peer to peer support around commercial / income
generation activity both internally within the
Council and relevant external organisations.   
Support from procurement regarding contract
management arrangements to monitor delivery.
Continued support from professional advisors
used to help Growth Deal Project Managers /
support Project Board meetings. 
Project Managers use of both the Project and
Programme assurance processes.
Continued use of the in-life review process during
2026.   
Board (led by Finance) to review measures in place
to foresee, plan and mitigate any potential
variances (overspend or underspend) in financial
profiles.  
Scrutiny of spend profiles by Finance Teams
(monthly or quarterly) and use of professional
advisors to review project costs. 
Page 139

Page 140

4.3 Monitoring the benefits to be realised by the Deal 
A key requirement of Growth Deal funding is the need to effectively monitor the
realisation of benefits associated with the investment being made.  There are two
different lenses this work can be viewed through: 
Project level monitoring and evaluation plans 
In May and November each year the MGD Programme Board considers updated
plans from the projects that are in delivery.  In November 2025 a draft plan for the
Business Enterprise Hub was submitted, with an expectation that by the May 2026
review, 7 of the Deal’s 8 projects will be in delivery.   
Whilst it is positive Project Managers are updating plans bi-annually, the PMO has
identified a number of steps that can be taken during 2026 to strengthen activity,
namely:   
Introduction of a dashboard to summarise the status of activity.
Trend data to indicate whether entries in plans are on track, ahead of schedule
or if remediation activity is required.  
Greater logic flow awareness of how the status of outputs will contribute to the
delivery of outcomes. 
Programme level benefits realisation plan 
The aspiration to develop a revised programme level benefits realisation plan
during 2025 was curtailed by a number of factors including: 
Continued uncertainty regarding the direction of the skills project, which
accounts for 32% of the total government investment in the region. This is
expected to be seen during Q4 2025/26.
Awareness that updating the plan in 2025 could have the potential to be
superseded following the release of updated benefits guidance from the
Scottish Government which is scheduled for Q4 2025/26 / Q1 2026/27. 
The expectation is that the PMO will develop an action plan during Q1 or Q2
2026/27 depending on when Scottish Government guidance is released, setting out
how the PMO will work to enhance both the benefits realisation plan and secure
evidence needed to determine the impact activity will make against key outcomes.   
48
Page 140

Page 141

49
5. Financial summary 
5.1 Funding sources for Deal activity 
Project 
Capital
Bus Revolution
BE Hub 1
Cultural Quarter
Digital Health
Early Years STEM 
Housing Mix Delivery
MICM
Skills
TOTAL
Revenue
Bus Revolution
BE Hub 1
Early Years STEM 
MICM
TOTAL
Scottish
Government
investment
(£’000) 
3,999
3,300
12,840
-
3,500
5,000
610
-
29,249 
-
2,000
-
1,250
3,250
UK
Government
investment
(£’000) 
-
-
4,100
5,000
-
-
2,442
21,000
32,542 
-
-
-
-
-
Local partner
investment 
including the
Moray Council 
(£’000) 
-
1,150
5,900
-
1,300
2,500
2,557
-
13,407 
300
1,350
1,600
-
3,250
Leveraged
investment
(public and
private)
(£’000) 
-
-
1,650
-
-
-
-
-
1,650 
-
-
-
-
-
Total
investment
(£’000) 
3,999
4,450
24,490 2
5,000
4,800
7,500
5,609
21,000
76,848 
300
3,350
1,600
1,250
6,500
1 Local partner investment made up of:
Capital:  £1m (Highlands and Islands enterprise), £0.15m (Pride in Place Funding)
Revenue:  £0.75m (UHI), £0.6m (Pride in Place Funding) 
2  From OBC stage the project has forecast a financial shortfall.  Currently estimated at circa
£4.45m, with applications for external funding in progress.  Project value excludes anticipated
private investment of £9.5m in a new hotel for Elgin (phase 3 of the project).   
Page 141

Page 142

50
5.2 Government funding drawn down Q4 24/25 to Q3 25/26 
In line with the conditions associated with Scottish and UK Government funding,
projects can only draw down funding once their full business cases have been
approved by the MGD Board, both Governments and Moray Council. During 2024,
six projects had reached this stage: 
Project 
Bus Revolution 
Cultural Quarter 
Digital Health 
EY STEM 
Housing Mix
Delivery 
MICM (capital) 
MICM (revenue) 
TOTAL
Government
investment
(£’000) 
3,999 
16,200 
5,000 
3,500 
5,000 
3,052 
1,250 
38,001 
Previous draw
down (up to Q3
24/25 inclusive) 
1,028 
0
3,684 
184 
2,781 
107 
0
7,784 
Period covered
(Q4 24/25 to Q3
25/26) 
722 
1,987 
797 
1,417 
262 
1,021 
133 
6,339
Draw down (all figures £’000) 
Total draw
down to date   
1,750 
1,987 
4,481 
1,601 
3,043 
1,128 
133 
14,123 
Page 142

Page 143

51
6. Engagement and consultation
activity undertaken during 2025 
From the initial identification of prospective projects before the Deal was signed in
December 2021, through business case development and then during the delivery
of projects, engagement and consultation is a core requirement to ensure what is
being delivered meets the needs of businesses and residents whilst contributing to
stretching Deal objectives.   
Focusing on businesses and community organisations, below is a list of key
engagement activity undertaken throughout 2025.   
Project
development 
Delivery
activity   
Procurement
activity 
Service
development
Workshops held to gather evidence that will inform the development
of a new skills and innovation project.  This involved:
Academic institutions who undertake activity within Moray or in
close proximity
Moray Council elected members
Bodies who represent Moray businesses
Moray businesses (either from key Moray business sectors, those
anticipated to experience growth and those who have highlighted
need).  
Public organisations with an interest in supporting and progressing
skills and innovation activity in the region 
Support from a range of community groups and businesses who sit on
project boards.   
Quick quote tender run for consultancy support to identify a vision for
a new skills and innovation project and strategic outline case.  This was
awarded to Optimat.  
Construction contract for the redevelopment of Elgin Town Hall
awarded to Taylor and Fraser. Following this, Taylor and Fraser ran
an event in Elgin that sought to recruit local firms for key work
packages.
Procurement undertaken by HIE for a service operator to run the
MICM facility.  In October 2025 the contact was awarded to Elevator
UK.  
HIE awarded facility management contracts throughout summer
and autumn 2025 for the running of the MICM facility.  
Lead developer appointed for the Dallas Dhu housing site, AJC
Construction.
Tender to develop the Elgin STEM Starts Hub awarded to Robertsons
(Construction) Ltd and Unusual Projects (interior fit out).   
Engagement with a range of businesses regarding workforce mobility,
with the aim of understanding shift patterns and operational
requirements.
Page 143

Page 144

52
7. Programme structure and
governance activity 
7.1 Structure of Moray Growth Deal activity and Officers involved
Executive oversight of the Moray Growth Deal 
Rhona Gunn Executive Director (Economy, Enterprise and
Operations) and Moray Growth Deal Senior
Responsible Officer (SRO) 
Beverly Smith Head of Growth, Planning and Climate 
Programme Management Office 
Michael Kelly Service Manager (Growth Deal) 
Lynne Owen Programme Officer 
Project Delivery 
Teams in place within different organisations working to deliver the eight
projects that make up the Moray Growth Deal. 
Bus Revolution (led by Moray Council) 
PM: Stevie Robertson Senior Project Manager 
SRO: Nicola Moss Head of Environmental and Commercial Services 
Business Enterprise Hub (led by UHI-Moray) 
PM: Samantha Scott BE Hub Project Manager and Deputy Head of
Academic Partnerships at UHI-Moray 
SRO: David Patterson UHI-Moray Principal 
Cultural Quarter (led by Moray Council) 
PM: Claire English Senior Project Manager 
SRO: Beverly Smith Head of Growth, Planning and Climate 
Page 144

Page 145

53
Digital Health (led by the Digital Health Institute) 
PM: Marie Simpson Programme Manager 
SRO: Janette Hughes Director of Planning and Performance 
Early Years STEM (led by Moray Council) 
PM: Lynne Owen Senior Project Manager 
SRO: Hazel Sly Service Manager (Early Years) 
Housing Mix Delivery (led by Moray Council) 
PM: Rachel Watts Senior Project Manager 
SRO: Gary Templeton Service Manager (Strategic Planning and
Development) 
MICM (led by HIE) 
PM: Chantal Geyer Senior Project Manager 
SRO: David Reid Area Manager (Moray) 
Page 145

Page 146

54
7.2 Summary of assurance activity progressed during 2025 
Assurance activity considered by the MGD Board is structured using a series of
‘gates’ that, when triggered, require Project Managers to make submissions for
approval to progress. 
Below is a summary of the activity that has been submitted to the MGD Board
during 2025.  
Work
stream 
HMD 
Bus
Revolution 
EY STEM 
EY STEM 
DHI 
DHI 
BE Hub
Assurance
gate 
F:  In-life
review 
E:  Change 
E:  Change 
F:  In-life
review 
E:  Change 
F:  In-life
review 
E:  Change
Description 
Project in-life review. 
Pre phase 2 commencing,
adjustment of the financial profile
based on actual information from
phase 1.   
Post Elgin Hub construction
tender realignment of the
financial profile and project
timeline.   
Project in-life review. 
Extension of the project delivery
window to allow more time for
more effective evaluation work to
be completed.   
Project in-life review. 
Adjustment to when revenue
funding will be provided by UHI
and SG, as SG funding currently
sitting outside the Deal window.
Date 
Jan 25 
Apr 25 
Apr 25 
May 25 
Jun 25 
Jun 25 
Sep 25
Status 
n/a 
Approved 
Approved 
n/a 
Approved 
n/a 
Approved
Gate
A B C D E F
Approval 
of Strategic
Outline 
Case (SOC)
Approval 
of Outline
Business
Case (OBC)
Approval 
of Full
Business
Case (FBC)
Closure 
of a 
project
Change
request to
previous
baseline
In-life 
review
Page 146

Page 147

55
Work
stream 
Bus
Revolution 
MICM 
Programme 
Assurance
gate 
E:  Change 
E:  Change 
E:  Change 
Description 
Request to use underspend to
fund AI simulation activity that
was not listed in the original FBC. 
Reprofile of the financial model,
delaying drawn down of HIE's
contribution to 2026/27. 
Request to move unallocated
capital from MICM to Cultural
Quarter.
Date 
Sep 25 
Nov 25 
Nov 25
Status 
Approved 
Approved 
Approved 
Page 147

Page 148

56
Actions arising from 
2024 internal audit 
Strengthening financial
arrangements 
Partners are reminded of the
requirement for audit evidence
when claims are submitted and
additional scrutiny given to the
project in question 
A review of payment types will be
undertaken to ensure compliance
with the European System of
Accounts 10 and in accordance
with grant conditions. 
Communications activity 
Further use should be made to
post information on My Moray
website and social media sites to
ensure effective communication of
any developments concerning the
Moray Growth Deal. 
The Stakeholder Engagement Plan
should be reviewed and, if
required, updated. Engagement
should be undertaken with the
targeted audiences for a project to
evidence an established objective
of the Moray Growth Deal.
All fields within the
Communications Planner
spreadsheet should be completed
to aid the communication
management needs of the Moray
Growth Deal. 
Position following 
2025 follow on audit 
Procedures have been amended to
now require supporting evidence
proportionate to the expenditure
by partner led projects to be
provided for claims made from
Moray Growth Deal funding. 
The Accountancy Service reviews
spend types to ensure compliance
with the European System of
Accounts 10 regulations, ensuring
that the conditions of the grant are
being met. 
Postings to the My Moray website
and social media sites have been
observed. There appears to be a
balance of activity against the stage
of the programme and individual
projects. 
At the time of the follow-up review
the communications planner had
been updated, ensuring
information has been captured
within the relevant fields. In
addition, press releases were
found to be stored within the
appropriate SharePoint site. 
The Stakeholder Engagement Plan
(Plan) has been reviewed and
updated and was approved by the
Programme Board at its meeting of
27 March 2025. 
7.3 Summary Audit activity undertaken during 2025 
Follow up audit undertaken by Moray Council 
Considered and approved by the Council’ Audit and Scrutiny Committee on 19th
November 2025, a report was submitted that followed up on actions set out in the
2024 internal audit of the Moray Growth Deal.  A copy of the report can be found in
appendix A.  
Page 148

Page 149

Following review by the Council’s Senior Auditor, all of the actions previously
suggested have been actioned and formally closed.   
HIE internal audit of the Manufacturing Innovation Centre project 
With a set of financial transactions for the MICM project in Q4 2024/25 totalling
£953, 716.32, a threshold was exceeded that led to a routine internal audit review
of the expenditure being initiated.   A copy of the report can be found in appendix
B, with a substantial assurance rating provided.  The audit team noting that: 
A clear audit trail of the transactions was held, including a summary of all key
decision documents.
No payments were provided in advance of need.
All transaction had been approved appropriately.   
57
Actions arising from 
2024 internal audit
Position following 
2025 follow on audit
All communications related
activities, where documented, e.g.,
press releases, should be saved on
the Moray Growth Deal SharePoint
site. 
Strengthening audit arrangements
with partners 
All partner organisations should be
informed that supporting evidence
must be provided for all
expenditure claimed from Moray
Growth Deal funding. 
Further to the findings noted within
the audit and discussions with the
Chief Financial Officer, a review of
the types of payments claimed by
the partner organisation should be
undertaken to ensure the correct
classification of expenditure.
More generally due to the
departure of a communications
team member, there has been
limited capacity to support the Deal
in the second half of 2025.   
A meeting between the Service
Manager Growth Deal, partners
and the Council’s Senior Auditor
took place in February 2025. This
provided an opportunity to gain a
greater understanding of the
auditing practices within partner
organisations and to develop a
more collaborative approach. 
The Service Manager Growth Deal
and Senior Auditor have also met
individually with all partners to
discuss their existing and planned
future audit activities, taking into
account the varying stages of
individual projects. 
In addition, the first iteration of an
annual strategic review of risk at a
Deal level, designed to support the
scope of future audit activity was
considered and approved by the
MGD Programme Board in
November 2025.
Page 149

Page 150

The report did identify that the legal agreement in place between the council and
HIE needed updating to reflect the outcome of change requests.  This has
subsequently been completed by both parties.   
Strengthening of audit arrangements between the Council and partners
leading projects 
With a view to further enhancing controls in place to oversee the delivery of
Growth Deal activity, in May 2025 the MGD Programme board considered and
approved a series of audit related actions.  These arose out of joint working
between the PMO and the Council’s internal audit team. 
58
Action 
That the PMO will undertake an
annual assessment of risk and
identify any themes from in-life
review activity, with a view to setting
out areas that should be the subject
of focus by Project Managers and be
considered as audit teams are
scoping future activity. 
There should be regular collaboration
between the Partner Organisations
Internal Audit Services and the
Council’s Senior Auditor regarding
audit activities undertaken and
planned.  This should include and ad
hoc catch-ups as needed to discuss
issues requiring further clarification
of points of concern. 
For the Council’s Senior Auditor to be
invited to ask supplementary
questions as part of the in-life review
process in the event they have
questions for specific projects.
Status update 
Risk review paper considered and
approved by the MGD Programme
Board on 27 November 2025.   
First sequence of constructive
meetings between the Council’s
internal audit team and counterparts
in partner led projects took place
during the summer of 2025 and will
be repeated annually.   
2026 sequence of in-life review
activity approved by the MGD
Programme Board on 27 November.
Page 150

Page 151

7.4 Complying with report findings from Scottish Parliament’s Economy and
Fair Work Committee report on Growth Deal activity   
Published in May 2025, the report sets out a number of recommendations that
focus on how transparency regarding Deal decision making could be enhanced. 
Specifically: 
59
Committee recommendation 
Ensure transparency of
decisions and delivery progress
on Deal websites 
Publish data on local business
involvement in annual reports 
Commit to continuous
improvement in transparency
and accessibility 
Strengthen engagement with
local businesses and
stakeholder groups 
Action to be taken by the Moray Deal 
Update reports are submitted to Moray
Council twice per year, along with ad hoc
project reports.  These will  be available as
per the reporting process for Council
meetings. 
Section 6 of this and future MGD annual
reports will provide information on this.    
MGD Programme Board will work to realise
this:
Board communications item should be
expanded to include a requirement to
consider transparency and accessibility
requirements associated with future
milestones.  
Members can use the milestone tracker in
the project dashboard report to identify
any associated actions that need to be
taken to satisfy this requirement.   
Build on measures already in place:  
Businesses involved in Deal Governance
Boards and sub-groups.
PIN notices issued for major
procurements that both raises awareness
and provides evidence to inform the
procurement activity.
Work with Business Gateway to raise
awareness of future opportunities. 
Page 151

Page 152

60
May 2026
Page 152

Page 153

REPORT TO: COMMUNITY PLANNING BOARD ON 3 JUNE 2026 
SUBJECT:  GOVERNANCE WHOLE FAMILY WELLBEING FUND 
BY: JIM LYON INTERIM CHIEF SOCIAL WORK OFFICER/HEAD OF
SERVICE 
1. REASON FOR REPORT 
1.1 This report clarifies the improved process of the spend and
administration of the Whole Family Wellbeing Fund (WFWF) and
strengthens the oversight arrangements across Moray Council, Moray
Integration Joint Board (IJB) and Moray Community Planning Partnership
(CPP). 
1.2 It better aligns governance with the expectations of the grant governance
requirements from the Scottish Government, taking account of local
arrangements for children, families, and justice services within the
Health and Social Care Partnership and Moray Council as the co-
statutory lead agency for the fund. 
2. RECOMMENDATION 
2.1  It is recommended that the Community Planning Board note the content of
the Briefing Summary attached as Appendix 1:  including: 
i. The duty to keep children safe and protected from significant harm at
home in the community, or in alternative care, where this cannot be
achieved; 
ii. The Promise to keep families together, regardless of the makeup of the
family, wherever possible; and 
iii. The need for improved governance of the WFWF particularly where
there are implications for the Council and Health & Social Care
Partnership including staffing, contractual requirements, or longer-
term sustainability matters as outlined in the report below. 
Item 8.
Page 153

Page 154

3. BACKGROUND 
3.1 There is no one factor which can predict child abuse or neglect.  However, we
do know that children growing up in homes where there is poverty, domestic
abuse, substance use, or mental health problems, are at a higher risk.  When
these risks are combined with the existing train on local services (Audit
Scotland reports 2024 and 2025), the implications for children are significant. 
The landscape of safeguarding and child protection is changing and although
practice is improving in some areas, statutory funding is stretched to keep up
with increased demand. 
3.2 In Moray the flow-into care during the last two financial years has been higher
than in preceding years resulting in internal resources being exhausted and
severe budgetary pressures. 
3.3 Nationally it has been difficult to access out of area care, and costs range from
£5.5K to £7.5K per week, excluding travel and time, to keep children in contact
with their families.  The current average cost of out of area (OOA) care per child
is £5,162 which is £291,824 per annum per child. 
3.4 A strategy for tackling the above children’s services pressures was presented
to and approved by the Integration Joint Board on 27 November 2025
(Paragraph 12 of the minute refers). As part of that strategy, it is recognised
there is need to strengthen governance arrangements for the WFWF, and this
report is being circulated as a Briefing summary for awareness and for
information to Moray Council Elected Members. 
4. SUMMARY OF IMPLICATIONS 
4.1 Children’s services are facing significant and sustained pressures, notably with
the increased flow-into care, the permanence backlog, resulting budgetary
constraints, and uncertainties surrounding the sustainability of funding
streams such as the WFWF, as well as significant rising costs of residential
care. 
5. CONCLUSION
5.1 This members’ briefing attached as Appendix 1 sets out strengthened
governance for the Whole Family Wellbeing Fund in Moray, clarifying roles and
decision-making across the Children’s Services Planning Partnership, Moray
Council, the Integration Joint Board and the Community Planning Partnership.
It highlights the significant and sustained pressures on children’s services and
the importance of robust oversight where funding decisions have staffing,
contractual or longer-term sustainability implications. The proposed
arrangements aim to ensure transparent, timely and collaborative use of the
fund, aligned to GIRFEC and The Promise, with proportionate scrutiny and
Page 154

Page 155

regular reporting to support improved outcomes for children, young people and
families. 
Author of Report:  Jim Lyon 
Background Papers:  
Moray  Integration Joint Board members briefing April 2026 
Page 155

Page 156

Page 156

Page 157

Appendix 1: 
Governance for the Whole Family Wellbeing Fund Moray Integration Joint Board –
Members’ Briefing
April 2026 
Moray Integration Joint Board – Members’ Briefing
April 2026 
Governance for the Whole Family Wellbeing Fund 
Introduction
This Briefing clarifies the improved process of the spend and administration of the
Whole Family Wellbeing Fund (WFWF) and strengthens the oversight arrangements
across Moray Council, Moray Integration Joint Board (IJB) and Moray Community
Planning Partnership (CPP). 
It better aligns governance with the expectations of the grant governance requirements
from the Scottish Government, taking account of local arrangements for children,
families, and justice services within the Health and Social Care Partnership and Moray
Council as the co-statutory lead agency for the fund. 
Summary
Children’s services are facing significant and sustained pressures, notably with the
increased flow-into care, the permanence backlog, resulting budgetary constraints,
and uncertainties surrounding the sustainability of funding streams such as the WFWF,
as well as significant rising costs of residential care. 
Background and Context
There is no one factor which can predict child abuse or neglect.  However, we do know
that children growing up in homes where there is poverty, domestic abuse, substance
use, or mental health problems, are at a higher risk.  When these risks are combined
with the existing train on local services (Audit Scotland reports 2024 and 2025), the
implications for children are significant.  The landscape of safeguarding and child
protection is changing and although practice is improving in some areas, statutory
funding is stretched to keep up with increased demand. 
In Moray the flow-into care during the last two financial years has been higher than in
preceding years resulting in internal resources being exhausted and severe budgetary
pressures. 
Nationally it has been difficult to access OOA care, and costs range from £5.5K to £7.5K
per week, excluding travel and time, to keep children in contact with their families.  The
current average cost of OOA care per child is £5,162 which is £291,824 per annum per
child.
Page 157

Page 158

A strategy for tackling the above children’s services pressures was presented to and
approved by the Integration Joint Board on 27 November 2025. As part of that strategy,
it is recognised there is need to strengthen governance arrangements for the WFWF,
and this report is being circulated as a Briefing summary for awareness and for
information to Moray Council Elected Members.
Proposals
Note the content of this Briefing Summary including: 
• The duty to keep children safe and protected from significant harm at home in
the community, or in alternative care, where this cannot be achieved 
• The Promise to keep families together, regardless of the makeup of the family,
wherever possible 
• The need for improved governance of the WFWF particularly where there are
implications for the Council and Health & Social Care Partnership including
staffing, contractual requirements, or longer-term sustainability matters as
outlined in the report below
Page 158

Page 159

Governance for the Whole Family Wellbeing Fund 
1. Governance:
1.1 This paper proposes specific governance arrangements in Moray for the
decision-making on the spend of the Whole Family Wellbeing Fund (WFWF)
taking account of the arrangements for children, families, and justice services
within the Health and Social Care Partnership, the Children’s Services Planning
Partnership (CSPP), formerly known as the GIRFEC Leadership Group (GLG), the
Community Planning Partnership (CPP), and relevant Council Committees, in
Moray. 
1.2 The WFWF was launched by the Scottish Government in 2022 to support holistic,
preventative family support aiming to:
➢ Improve outcomes for children, young people, parents, and carers
➢ Prioritise prevention and early intervention (support)
➢ Provide joined-up support that meets the interconnected needs of whole
families (coordinated support e.g. addictions, mental health, poverty, support
for carers of children and direct services for children)
➢ Reduce the need for crisis intervention by strengthening community-based
family support (preventing the flow-into care) 
2. Background:
2.1 Annual WFWF allocations are determined by local demographic area, assessed
need, and alignment with national priorities.  The Scottish Government expects
councils to work collaboratively with health boards, the third sector, and
community partners to design and deliver integrated support.  This partnership
ethos is collaborative planning, shared learning, and collective action which is
central to the fund. 
2.2 The aim of the fund is to ensure every family needing support gets the right
support at the right time, for as long as needed, to fulfil children’s rights to be
raised safely in their own families.  This incorporates a broad definition of family,
including adoptive, biological, foster, kinship, extended, composite and other
forms of family, such as those settings and homes which feel like families.  It
acknowledges some children may belong to more than one family. It includes
keeping children together even when they have been accommodated. 
2.3 The WFWF is paid to the Council via the General Revenue Grant for spend by the
CSPP as per the grant offer.  The Scottish Government recently extended the
WFWF programme to March 2027 but there is currently no confirmation of
funding beyond that date. 
3. Decision Making:
3.1 The WFWF Grant Offer from the Scottish Government states that:
➢ “Decision-making for the fund remains in accordance with the collective
agreement and direction of the local CSPP, with accountability resting with
each strategic Children’s Services Planning governance forum (note: this
Page 159

Page 160

forum does not exist in Moray – see section 5 below).  This reflects the
agreement reached with COSLA, that local authorities, as the co-statutory
lead agency with duties in respect of the Children’s Services Planning, will
support the CSPP ownership of the funding by holding and administering it on
its behalf”. 
3.2 The Scottish Government explained that the WFWF, funding programme, was
established with the purpose of driving the system change required at local level,
principally through existing CSPPs, to deliver family support in line with
Scotland’s National Principles. Recognising the varying circumstances of local
areas, the Scottish Government did not seek to mandate a specific delivery
model for the fund that would be required everywhere. Instead CSPPs were
asked to hold the funding and assess their current delivery system to consider
what the gaps and opportunities were for them in delivering holistic support for
families. 
3.3 The above requirements mean the fund will continue to be decided upon by the
“collective agreement and direction” of the CSPP with accountability resting, in
the case of Moray, with the Council, as the co-statutory lead agency with duties
in respect of Children’s Services Planning, and the IJB with responsibility for
children, families and justice services and proportionated, but strong health
board representation. The Council shall continue to support the CSPP’s
“ownership” of the funding by holding it on behalf of the CSPP and
“administering” it in accordance with the decisions made by the CSPP. 
3.4 The CSWO and the Head of Education, as Chair and Vice Chair, have
appropriate levels of funding limits and accountability within the Council’s
Financial Regulations allowing them to authorise appropriate spend from the
fund out with those areas outlined in sections 7 and 9 below requiring specific
governing body approval. 
4. Funding Carry-over:
4.1 The WFWF Grant Offer reminds CSPPs that the General Revenue Grant provides
a carry-over function, therefore, any underspend from previous years should be
carried over and allocated towards WFWF activity. 
5. Virtual Governance Forum:
5.1 A forum usually means a meeting or medium where ideas and views on a
particular issue can be exchanged most often as one group meeting together
with single purpose. Given Moray does not have a such a model for the
governance of the WFWF,  as per the statement in the Scottish Government
Grant Offer, it is possible to have a  virtual forum involving key organisational
bodies which have interest in oversight and support of WFWF decision-making. 
5.2 Given that children, families, and justice services have been integrated into
Moray health and social care partnership, under the direction of the IJB, the
virtual Children’s Services Planning governance forum can effectively be: 
Page 160

Page 161

➢ Moray Council
➢ Moray IJB
➢ Moray Community Planning Partnership 
6. Role of Governing Bodies & Co-statutory Lead Agencies:
6.1 The above bodies have a variety of roles and responsibilities all with varying
degrees of responsibility for Children’s Services Planning as laid out in national
community planning partnership arrangements. With regards to the WFWF and a
virtual governance forum the following bodies would have the following roles:   
➢ The role of Moray Council as the co-statutory lead agency would be to
support the CSPP’s “ownership” of the funding by holding it on its behalf and
administering it in accordance with its spending decisions.
➢ Where recommendations for decisions involving staffing, contracts,
commissioning, or sustainability are brought to the Council, the Council will
scrutinise and decide accordingly as per the implications for the Council. 
➢ The role of Moray IJB as the governing body for the health and social care
partnership, in which children, families, and justice services sit, would be to
support the CSPP’s ownership of the funding by having oversight and
awareness of  the use of the fund and any strategic implications as per the
overall strategic priorities for those services governed by the IJB.
➢ Where recommendations for decisions involving staffing, contracts,
commissioning, or sustainability are brought to the IJB, it will scrutinise and
decide accordingly as per the implications for the IJB. 
➢ The role of Moray Community Planning Partnership (MCPP) is to support
the CSPP’s ownership of the funding by having awareness of the decision-
making and by receiving the Children’s Service Plan’s annual reports with
high-level details of the WFWF spend as a key part of the strategic delivery
partnership for children’s services in Moray.
➢ MCPP sits at the top of the community planning organogram and has a
central role in overall community planning with specific interest in the Local
Outcome Improvement Plan (LOIP). Its priorities are underpinned by existing
strategic partnership plans including the integrated Children’s Services Plan,
Getting it Right for Every Child, and Children’s Rights which are priorities for
the CSPP. 
7. Decision-making and Co-statutory Lead Agencies:
7.1 Where decision-making for the fund has potential implications for the Council
or IJB, for example:
➢ Staffing including temporary employment, redeployment, retention
and termination
➢ Contracts or commissioning
➢ Longer-term sustainability of projects, resources, or service
developments
Page 161

Page 162

7.2 These matters must be taken to the appropriate co-statutory or governing body
seeking approval of the recommended decision of the CSPP while clearly
outlining the projected implications for transparency, scrutiny, and decision-
making. 
7.3 Given the WFWF is not confirmed beyond March 2027, there should be no
decisions made on the appointment of permanent staff from what is essentially
a time-limited or temporary funding stream. 
7.4 Any recommended temporary staffing decisions must have sustainability built-
in and should also be presented to the appropriate governing body for
transparency, scrutiny and decision-making. Depending on the nature of any
such recommended decisions by the CSPP, longer-term sustainability must be
addressed or there is a clear exit or termination plan for the project, resource,
or service development. 
7.5 The CSPP does not have any delegated authority to approve any spend which is
over its funded budget. Any decision for over budget spends can only be
approved by Moray Council. This approval should not be asked for
retrospectively.   
8. Children’s Services Planning Partnership:
8.1 At its meeting on 24 February 2026, the GIRFEC Leadership Group (GLG)
agreed to change its name to the Children’s Services Planning Partnership in
line with national expectations on children’s services planning arrangements
and to be more reflective of the work of the group locally in Moray. 
9. Governance Proposal:
9.1 Given there is no recognised CSPP “governance forum” in Moray and children,
families, and justice services sit within the Health and Social Care Partnership
(HSCP) in Moray, it is proposed that: 
9.2 The CSPP, as per the WFWF Grant Offer, continues (as previously under the
GLG) to have responsibility for decision-making on the spend from the fund
under new Terms of Reference as per Appendix 1. 
9.3 The overall responsibility for the fund rests with the CSPP as per the Grant Offer
with day-to-day fund management under the direction of the Head of Service,
Children, Families and Justice Services, and Chair of the CSPP, supported by
the Vice Chair, Head of Education Services. 
9.4 Moray IJB shall have a strategic, awareness and oversight role for the decision-
making and deployment of the fund. 
9.5 Moray Council will continue to support the CSPP’s “ownership” of the fund by
holding it on its behalf and administering it in accordance with the CSPP’s
spending decisions.
Page 162

Page 163

9.6 Moray Community Planning Partnership’s role is to support the CSPP’s
ownership of the funding by having awareness of the decision-making and
strategic alignment within the LOIP by receiving the Children’s Service Plan’s
annual reports including high-level details of the WFWF spend as represented
in the organogram in Appendix 2 by a direct line from the Scottish Government
to Moray CSPP. 
9.7 Where there are implications for the HSCP and Council, for example, staffing,
contractual requirements, or longer-term sustainability matters, there would
be specific requirement to present any such recommendations to the IJB and
relevant Council Committees for formal approval, decisions, scrutiny, and
feedback as required. 
9.8 As per existing arrangements, the Children’s Services Plan (CSP) containing
high level details of the WFWF expenditure shall be reported to the CPP
annually for noting. 
9.9 A six-monthly general reporting model, including reporting routes to the IJB,
and Council Committees, is introduced for oversight, transparency, and
awareness of governing bodies. 
9.10 Acting in a coordinated way, the Council, IJB and CPP, form a virtual forum in
Moray for support, oversight, and strategic alignment of the WFWF as “owned”
by the CSPP. 
9.11 Annual reporting, combined with children’s service planning annual reports,
submitted to the Scottish Government as per existing arrangements as
represented in the organogram in Appendix 2 by a direct line from the Scottish
Government to Moray CSPP. 
Details of the flow of communication and reporting on these proposals are
contained in the organogram in Appendix 2 WFWF Governance Forum. 
10. Monitoring and Evaluation:
10.1 The Scottish Government continues to engage with CSPPs as part of
monitoring the impact of the WFWF as well as publishing independent evaluation
of year-on-year activities, and annual reporting by means of standard templates. 
Further details of the Scottish Government’s approach to evaluating the longer-
term delivery and impact of this funding on children, young people and families
for Year 4 and beyond will be provided in due course. 
10.2 We have established an effective and positive working relationship with
the Scottish Government WFWF Lead Officer via our Lead Officer GIRFEC and
The Promise who confer and collaborates on the spend as required. 
11. Recommendations: 
It is recommended that SMT/CLT:
Page 163

Page 164

I. Approves the proposals for strengthened governance and scrutiny
arrangements as outlined in sections 3 to 7 above;
II. Notes the proposal for the WFWF to be governed by the arrangements
outlined in the proposals in sections 9 to 9.10 above;
III. Notes the proposals for reporting arrangements for projects, staffing and
sustainability matters, as per sections 7 and 9.6 above; and
IV. Otherwise notes the content of this report. 
12. Approval: 
These recommendations were approved by Moray Health and Social Care
Partnership, Senior Management Team, at its meeting on 1 April 2026, and by
Moray Council, Corporate Leadership Team, at its meeting on 2 April 2026. 
Jim Lyon
Interim Head of Service/CSWO 
Page 164

Page 165

Appendix 1 
Terms of Reference Children’s Services Planning Partnership 
1.CONTEXT  Moray Children’s Services Planning Partnership (CSPP)
provides strategic leadership and multi-agency coordination
to improve outcomes for babies, children, young people, and
families in line with the Children and Young People
(Scotland) Act 2014 (Part 3) which sets out the legal duties
for Children’s Services Planning 
2.PURPOSE  CSPP’s purpose is to ensure partners work together to embed
GIRFEC values and deliver integrated, preventative,
rights-based community services across Moray which
respond to need at the earliest appropriate time
3.STRATEGIC
OBJECTIVES 
Moray Children’s Services Planning Partnership will:
Deliver the Children’s Services Plan (CSP)
Oversee, coordinate, and drive the multi-agency delivery of
Moray’s Children’s Services Plan 2026–2029, ensuring actions
are evidence-informed and aligned to statutory requirements
and GIRFEC principles.
Oversee Whole Family Wellbeing Funding 
The Partnership will oversee the targeted use of Whole Family
Wellbeing Funding allocated to Children’s Services Planning
Partnerships to strengthen early intervention, enhance
coordination, and ensure families access timely, holistic
support. It will monitor allocations, review progress, promote
preventative and rights-based practice, and support
continuous improvement through transparent annual
reporting, collaboration and evidence-informed
decision-making.
Promote GIRFEC Practice Across Moray
Support consistent implementation of GIRFEC, including use
of the National Practice Model, wellbeing indicators, and
co-ordinated child planning processes as described by
national GIRFEC policy.
Strengthen Multi-Agency Collaboration
Bring together statutory, third sector and community partners
to jointly assess needs, share information appropriately, and
co-design support and services to improve outcomes for
families, reflecting the collaborative ethos of GIRFEC-related
multi-agency groups.
Ensure Children’s Rights and Participation
Embed UNCRC principles in planning and decision-making,
Page 165

Page 166

ensuring children, young people and families meaningfully
shape priorities and service developments, consistent with
national expectations for Children’s Services Planning.
Provide Assurance and Continuous Improvement
Lead self-evaluation, quality assurance, and improvement
activities, using local data, practitioner insight, lived
experience and national guidance to identify and respond to
areas of need or risk.
4.ROLES AND
RESPONSIBILITIES 
Moray Children’s Services Planning Partnership (CSPP)
will:
Set strategic priorities and provide oversight for the Children’s
Services Plan.
Monitor performance and receive regular updates on
progress.
Identify areas requiring multi-agency action and commission
thematic or task groups as needed, reflecting local needs-led
GIRFEC approaches.
Ensure resources allocated through the partnership including
Whole Family Wellbeing Funds are used equitably,
responsibly and in line with governance expectations. 
Promote shared learning, good practice and alignment with
The Promise, Corporate Parenting duties, Child Poverty work
and Child Protection Improvement planning as required by
integrated statutory planning arrangements.
5.GOVERNANCE
AND SUBGROUPS 
CSPP sits within Moray’s wider Community Planning
governance structure, as a strategic delivery partnership
consistent with existing arrangements in Moray delegated
through the Community Planning Board.
Reporting 
The group will formally report progress updates to the
Community Planning Board in accordance with an agreed
reporting schedule, in line with statutory duties and existing
governance structures in Moray.
An annual progress report for ratification will be submitted to
the Community Planning Board.
The Partnership will also provide information to national
reporting processes on Children’s Services Plans, GIRFEC,
Child Poverty and UNCRC implementation.
The CSPP may establish or oversee specialist subgroups
aligned to the Children’s Services Plan, such as:
➢ GIRFEC Implementation Group
➢ The Promise Delivery Group
➢ Child Protection Committee or Subgroups
➢ Corporate Parenting Strategic Group
➢ Family Support Strategic Group 
➢ Child Poverty Subgroup
➢ Participation / Voice Group
Page 166

Page 167

6. MEETINGS AND
OPERATION  
Frequency
CSPP will meet every six weeks, with additional meetings
scheduled where required. 
Quorum
The meeting will be quorate with representation from local
authority, health, and police and the third sector. 
Papers
Members will receive the agenda and associate papers at
least 5 working days in advance of the meeting. Members
must alert Chair of agenda items prior to this. 
Attendance 
Apologies must be submitted in advance of the meeting. If a
member is unable to attend, they must provide an update to
the Chair beforehand. Where appropriate, an agency depute
should attend in their place, and the Chair must be notified. 
Workplan
The CSPP will approve and maintain a multi-agency workplan
associated to the workplans of the thematic groups delivering
Morays Children’s Service Plan. This will be reviewed
annually. 
Reporting:
As outlined in section 2 ‘Governance’, annual progress
reports will be submitted to the Community Planning Board, in
line with statutory duties and existing governance structures
in Moray. The Partnership will also provide information to
national reporting processes on Children’s Services Plans,
GIRFEC and UNCRC implementation.
7.STANDING
AGENDA ITEMS 
Standing Agenda items will include. 
• Children’s Services Plan (CSP) Progress Updates.
• Whole Family Wellbeing Funding Oversight
• Subgroup Updates
• Finance and Resource Updates
Emerging Issues, Risks or Policy Changes
8. RECORD OF
PROCEEDINGS
Minutes will be recorded for every meeting of the Children’s
Services Planning Partnership. Once completed, the minutes
will be circulated to all Partnership members. The record will
include key discussion points, decisions made, agreed
actions, and responsibility for follow-up. Minutes will be
stored in line with local governance requirements to ensure
transparency and accountability.
9. MEMBERSHIP  Membership reflects the multi-agency nature of children’s
services planning and will include leaders from:
Page 167

Page 168

• Local Authority: Education, Early Years, Community
Learning & Development, Housing, Community Safety  
• Moray H&SCP: Social Work, Public Protection, Health
Visiting, School Nursing
• NHS Grampian: Public Health
• Police Scotland
• Third Sector: Moray Third Sector Interface and or
children’s localities network third sector chair 
Core Membership 
• Jim Lyon, Interim Chief Social Work Officer/Head of
Service - Chair
• Vivenne Cross, Head of Education – Vice Chair
• Dawn Parker, GIRFEC/Promise Lead Officer, Children’s
Services Planning Team
• Marjorie Johnston, Public Health Consultant, NHS
• Elizabeth Robinson, Public Health Consultant, NHS
• Siobhan Crawford, Service Manager, C&YP Mental
Health Service, NHS
• AHP Lead, NHS
• Shelley Taylor, Service Manager C&F Health Service,
NHS
• Tracy Davis, Child Health Commissioner, NHS
• Simon Reid, Partnership Superintendent, Police
Scotland
• Emma Johnston, Public Protection Lead Officer
• Fred McBride, Independent Chair, Child Protection
Committee
• Caroline Cooper, Service Manager, Children First, 3rd
Sector localities meeting Chair membership shared
with co-chair of Third Sector localities meeting TBC
• Martin Robertson Service Manager, Community
Strategy and Engagement 
• Judith Proctor, Chief Officer, Moray IJB
• Denise Whitworth, Executive Director, Education,
Housing & Communities 
• Nicky Gosling, Accountant 
10.REVIEW OF
TERMS OF
REFERENCE 
This Terms of Reference will be reviewed every two years or
sooner if:
• National policy changes
• Amendments are made to statutory Children’s
Services Planning requirements
• Structural changes within local governance
frameworks   
Draft 1: 9 February 2026 
Page 168