Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
22 February 2023 
NOTICE OF MEETING 
A meeting of the MID ARGYLL, KINTYRE & THE ISLANDS AREA COMMITTEE will be held ON
A HYBRID BASIS BY MICROSOFT TEAMS AND IN THE COUNCIL CHAMBERS, KILMORY,
LOCHGILPHEAD on WEDNESDAY, 1 MARCH 2023 at 10:00 AM, which you are requested to
attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTE OF THE MID ARGYLL, KINTYRE AND THE ISLANDS AREA
COMMITTEE HELD ON 7 DECEMBER 2022 (Pages 3 - 10) 
4. PUBLIC QUESTION TIME 
5. PUPIL VOICE 
Verbal Presentation by Pupil Representatives of Campbeltown Grammar;
Lochgilphead High School; Islay High School and Tarbert Academy 
6. TRANSPORT SCOTLAND - ANNUAL UPDATE 
Verbal Update by North West Area Manager, Transport Scotland 
7. SCOTTISH WATER ANNUAL UPDATE 
Verbal Update by Regional Communities Manager – West, Scottish Water 
8. AREA PERFORMANCE REPORT - FQ3 2022/23 (Pages 11 - 44)  
Report by Executive Director with responsibility for Customer Support Services 
9. ROADS AND INFRASTRUCTURE SERVICES UPDATE (Pages 45 - 48)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
10. CEMETERY PROVISION AND MAINTENANCE - TO FOLLOW 
Report by Executive Director with responsibility for Roads and Infrastructure Services
Public Document Pack

Page 2

11. HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING INVESTMENT
PLAN (SHIP) - ANNUAL UPDATE (Pages 49 - 62)  
Report by Executive Director with responsibility for Development and Economic
Growth 
12. AREA COMMITTEE APPOINTMENT TO ISLAY AND JURA COMMUNITY
ENTERPRISES LTD (Pages 63 - 68)  
Report by Governance Manager 
13. MID ARGYLL, KINTYRE AND THE ISLANDS AREA COMMITTEE WORKPLAN
(Pages 69 - 74) 
Mid Argyll, Kintyre & the Islands Area Committee 
Councillor John Armour Councillor Jan Brown
Councillor Garret Corner (Chair) Councillor Robin Currie (Vice-Chair)
Councillor Donald Kelly Councillor Tommy MacPherson
Councillor Dougie McFadzean Councillor Dougie Philand
Councillor Alastair Redman   
Shona Barton, Governance Manager 
Contact: Lynsey Innis, Senior Committee Assistant; Tel:  01546 604338

Page 3

MINUTES of MEETING of MID ARGYLL, KINTYRE & THE ISLANDS AREA COMMITTEE held ON
A HYBRID BASIS BY MICROSOFT TEAMS AND IN THE COUNCIL CHAMBERS, KILMORY,
LOCHGILPHEAD 
on WEDNESDAY, 7 DECEMBER 2022 
Present: Councillor Garret Corner (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Robin Currie
Councillor Donald Kelly (Teams) 
Councillor Tommy MacPherson
Councillor Dougie McFadzean
Councillor Douglas Philand
Councillor Alastair Redman (Teams) 
Attending: Jim Smith, Head of Roads and Infrastructure Services
Shona Barton, Governance Manager
Stuart Green, Corporate Support Manager
Stuart Watson, Assistant Network and Standards Manager
James Lafferty, Project Officer
Douglas Whyte, Team Leader
Michelle Mundie, Chief Executive, ACHA 
1. APOLOGIES 
The Chair welcomed everyone to the meeting. 
There were no apologies for absence intimated.   
2. DECLARATIONS OF INTEREST 
Councillor Dougie Philand declared a non-financial interest in agenda item 5
(Lochgilphead CARS – Recommendation of Grant Award) due to members of his family
having tendered for works to be carried out in relation to this project.     
3. MINUTE OF THE MID ARGYLL, KINTYRE AND THE ISLANDS AREA
COMMITTEE HELD ON 7 SEPTEMBER 2022 
The Minute of the Mid Argyll, Kintyre and the Islands Area Committee meeting, held on 7
September 2022 was approved as a correct record.   
4. PUBLIC QUESTION TIME 
There were no public questions submitted.   
Having declared a non-financial interest in the following item of business, Councillor
Philand left the room and took no part in discussion of this item.
.
5. LOCHGILPHEAD CARS - RECOMMENDATION OF GRANT AWARD 
Consideration was given to a report which provided an update on the progress of the
Lochgilphead CARS project and sought the approval of a grant offer to the owners of 3 –
17 Colchester Square, Lochgilphead.  
Page 3 Agenda Item 3

Page 4

Decision 
The Mid Argyll, Kintyre and the Islands Area Committee:- 
1. approved the grant offer of up to £241,808.68 to the owners of 3 – 17 Colchester
Square, Lochgilphead; and 
2. agreed to delegate the issue of the grant contract to the Executive Director with
responsibility for Development and Economic Growth in consultation with the Chair of
the Area Committee only once all necessary checks have been completed.   
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth, dated 7 December 2022, submitted) 
Councillor Philand re-joined the meeting for the remainder of the business.  
.
6. AREA PERFORMANCE REPORT - FQ2 2022/23 
Consideration was given to the Area Performance Report for financial quarter 2 of
2022/23 (July to September 2022) which illustrated the agreed performance measures for
this period. 
Members expressed their dissatisfaction that no officer was in attendance to speak to this
item.  Having noted the approach taken in relation to this item was a historical operational
agreement that dated back to the previous Council term, Members requested that the
Governance Manager feedback their concerns to relevant officers and to the next meeting
of the Area Chairs and Vice Chairs. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee:- 
1. noted and considered the performance and supporting commentary as presented; 
2. agreed that upon receipt of the Quarterly Performance Report, the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any queries; 
3. noted that work was ongoing and to respond to Sonya Thomas with requests or
comments regarding the layout and format of the Performance Report; and 
4. requested that the Governance Manager feedback the concerns of the Committee to
relevant officers and to the next meeting of the Area Chairs and Vice Chairs.   
(Reference:  Report by Executive Director with responsibility for Customer Support
Services, dated 7 December 2022, submitted) 
7. PERFORMANCE REPORT UPDATE 
The Corporate Support Manager provided a short presentation on the Performance
Excellence project.  He outlined the findings of the Council’s Best Value Audit which took
place in 2020 and highlighted key points from the Best Value Improvement Action Plan. 
Page 4

Page 5

Mr Green advised that as a result of recommendations agreed by Council in September
2021, a new suite of Corporate Outcome Indicators will be reported on annually and that
other improvements to the system were underway.  He outlined the new hierarchy of
performance reporting and confirmed that the Pyramid system previously used for
performance reporting will be decommissioned by the end of this financial year.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee agreed to note the information
provided.   
(Reference:  Presentation by Business Support Manager, submitted) 
8. A&B HSCP ANNUAL PERFORMANCE REPORT 2021 
Having noted that there was no officer in attendance to present this item, the Committee
gave consideration to a report which presented the Argyll and Bute HSCP Annual
Performance Report for 2021. 
Members expressed their dissatisfaction that there was no officer in attendance and
requested that the Governance Manager feedback a number of questions in relation to the
report.     
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee considered and noted the Annual
Performance Report for the Health and Social Care Partnership for the year 2021, which
was presented to the Integration Joint Board (IJB) at its meeting on 23 November 2022.   
(Reference: Report by Head of Strategic Planning, Performance and Technology, dated 7
December 2022, submitted) 
9. ACHA ANNUAL UPDATE 
Consideration was given to a presentation by the Chief Executive of ACHA, which
provided an update on a number of areas including the investment programme for
2022/23; the Warm Homes Fund; the Business, Energy, Industrial Strategy (BEIS) Whole
House Retrofit Programme; the replacement of wet electric heating systems; the Exemplar
Estates initiative and a number of new build and refurbishment sites across the locality. 
Further information was provided in respect of Welfare Rights; the Rent Consultation for
2023/24; ACHA’s 10 10 10 initiative and ACHA’s Community Action Fund.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee agreed to note the information
provided. 
(Reference:  Presentation by Chief Executive of ACHA, submitted)   
10. LOCAL HOUSING STRATEGY (LHS) 2022-27 - ANNUAL UPDATE 
Members gave consideration to a report which presented the Argyll and Bute Local
Housing Strategy (LHS) Annual Report for 2022.  It was noted that a further report with
Page 5

Page 6

area specific information would be provided to the Committee at their meeting in March
2023.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee considered and noted the
contents of the report.   
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth, dated 7 December 2022, submitted)   
11. ROADS AND INFRASTRUCTURE SERVICES UPDATE 
The Committee gave consideration to a report which provided an update on the recent
activities of Roads and Infrastructure Services and highlighted works being undertaken
which were relevant to the Mid Argyll, Kintyre and the Islands area. 
Discussion took place in respect of the Roads Resurfacing Programme and in particular to
the lack of white lining on the B842, Campbeltown to Southend Road and on a number of
roads on Islay.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee considered and noted the
contents of the report and provided feedback on the proposed new format.   
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated 7 December 2022, submitted) 
The Chair moved and the Committee agreed to adjourn for a short comfort break.  On
resuming at 1:40pm, all Members were in attendance as per the sederunt.  
.  
12. CEMETERY ASSET REPORT 
Having requested an update on cemetery provision and maintenance at their last meeting,
the Committee gave consideration to the Cemetery Asset Report that was presented to
the Environment, Development and Infrastructure Committee at their meeting on 1
December 2022.   
Discussion was had in relation to the information contained within the report presented,
with Members expressing their extreme concern that this was not what had been
requested at their last meeting on 7 September 2022.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee:- 
1. agreed that no decision would be taken on the report before them for consideration; 
2. requested that a further report be brought to the Mid Argyll, Kintyre and the Islands
Area Committee meeting in March 2023, providing the detailed information requested
by the Area Committee at their meeting on 7 September 2022; and 
Page 6

Page 7

3. noted that in the interim period, a Business Day session would be held to consider
cemetery asset, provision and maintenance.   
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated 7 December 2022, submitted) 
13. PROPOSED ARGYLL AND BUTE COUNCIL (OFF-STREET PARKING PLACES
AND CHARGES) (INVERARAY) ORDER 202_ 
Consideration was given to a report which provided an update on the proposed Traffic
Regulation Order “Argyll and Bute Council (Off-Street Parking and Charges) (Inveraray)
Order 202_” (hereafter, the “TRO”) and provided detail of the objections to the draft TRO. 
Discussion took place in respect of the proposal to introduce all year round charging, with
it being noted that the Committee could amend the conditions contained within the
Schedule if they so wished.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee agreed that the draft “Argyll and
Bute Council (Off-Street Parking and Charges) (Inveraray) Order 202_” TRO can be
made, subject to an amendment to the Schedule to remove the change to all year
charging, retaining the seasonal arrangement for all chargeable car parks in Inveraray. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated 7 December 2022, submitted) 
14. PROPOSED ARGYLL AND BUTE COUNCIL (OFF-STREET PARKING PLACES
AND CHARGES) (MID ARGYLL, KINTYRE AND ISLAY) ORDER 202_ 
Consideration was given to a report which provided an update on the proposed Traffic
Regulation Order “Argyll and Bute Council (Off-Street Parking and Charges) (Mid Argyll,
Kintyre and Islay) Order 202_” (hereafter, the “TRO”) and provided detail of the objections
to the draft TRO. 
Discussion took place in respect of the confusion of the terminology used within the draft
TRO, particularly in relation to tariffs and charging hours and the possibility that this may
cause undue concern for communities who require the use of the car parks outlined within
Schedule 1 of the draft TRO for their day-to-day living.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee agreed that the draft “Argyll and
Bute Council (Off-Street Parking and Charges) (Mid Argyll, Kintyre and Islay) Order 202_”
TRO can be made, subject to the insertion of the words “free of charge” at Schedule 1.   
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated 7 December 2022, submitted) 
15. CHARITABLE TRUSTS, BEQUESTS AND TRUST FUNDS 
Page 7

Page 8

The Committee gave consideration to a report which provided details of a number of
Trusts and Bequests that remain active in the Mid Argyll, Kintyre and the Islands area and
sought agreement on the proposed distribution methods. 
It was noted that there was an error in the name of the “Hutcheson Memorial Trust” which
should be the “Hutcheon Memorial Trust”. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee:- 
1. noted the financial position of the Charitable Trusts, Bequests and Trust Funds as of
August 2021; 
2. agreed that the Hutcheon Memorial Trust and May Paterson Trust prizes be limited to
£30; 
3. agreed that all other charities and trust funds, that have historically been awarded to
Council Departments and Allied partners, are awarded on the basis outlined in
paragraph 5.5 and defined within appendix 1; and 
4. noted that officers are in ongoing dialogue with representatives from the Lord
Advocates office to establish appropriate methods of distributing those funds that have
no established distribution arrangements. 
(Reference:  Report by Executive Responsibility for Legal and Regulatory Support, dated
7 December 2022, submitted) 
16. APPOINTMENT TO OUTSIDE ORGANISATIONS 
The Committee gave consideration to a report which outlined a number of vacancies on
outside organisations specifically, Campbeltown Ferry Committee and Islay and Jura
Community Enterprise Ltd. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee agreed that Councillor Dougie
McFadzean would be appointed to the Campbeltown Ferry Committee and Councillor
Alastair Redman would be appointed to Islay and Jura Community Enterprise Ltd. 
(Reference:  Report by Executive Director with responsibility for Legal and Regulatory
Support, dated 7 December 2022, submitted)   
17. MID ARGYLL, KINTYRE AND THE ISLANDS AREA COMMITTEE WORKPLAN 
The Committee gave consideration to the Area Committee workplan for future meetings. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee considered and noted the
contents of the workplan. 
(Reference:  Area Committee Workplan, dated 7 December 2022, submitted)
Page 8

Page 9

18. NOTICE OF MOTION UNDER STANDING ORDER 13 
The Committee gave consideration to the following Notice of Motion under Standing Order
13 that have been submitted by Councillor Donald Kelly and seconded by Councillor John
Armour:- 
Despite the best efforts of the Council both Dalintober and Castlehill Primary Schools in
Campbeltown which are in a poor condition continue to be in my and many others opinion
no longer fit for purpose.
They are both outdated 19th Century buildings which have been and continue to be
patched up on a yearly basis which is a constant drain on limited council resources. This
is not best value for the Council or the Council Taxpayer.
These buildings continue to have numerous problems with leaking roofs (which was the
subject of unexpected ceiling collapses in Dalintober fortunately at a weekend when the
school was closed) dampness throughout the school (which is apparent for all to see)
roofing insulation appearing on children’s desks, windows sealed shut in classrooms,
broken windows now being replaced by plywood (instead of glass) etc. the list goes on.
Approx. 20 years ago like many other communities in Argyll and Bute Campbeltown was
offered a joint Campus facility due to the nature of the offer this was dismissed out of hand
by the community after a full public consultation.
The wider community now feel that the time has come for the council to be forward
thinking and make the initial preparations for a new Campbeltown Primary School
ensuring that we have a shovel ready project as and when funding becomes available.
This view is shared by many parents, staff and children and even some of the businesses
who have worked on the schools over the past number of years - hence this motion.
Motion
That the MAKI Area Committee request
1. That the Community Services Committee who exercise the functions of the Council
as the Education Authority request that the Executive Director with responsibility for
Education prepares an initial report outlining the way forward and potential for a
proposal in terms of the school (consultation Act 2010) which would allow for an
initial business case to be formulated with a view to replacing the existing outdated
Campbeltown primary schools of Dalintober and Castlehill. 
2. That the completed report is presented to a meeting of the Community Services
Committee for deliberation in early 2023. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee agreed the terms of the Motion. 
(Reference:  Notice of Motion under Standing Order 13 by Councillor Donald Kelly,
seconded by Councillor John Armour, submitted) 
Page 9

Page 10

This page is intentionally left blank

Page 11

1 
ARGYLL AND BUTE COUNCIL MID-ARGYLL, KINTYRE AND
THE ISLANDS AREA
COMMITTEE 
CUSTOMER SUPPORT SERVICES   1 MARCH 2023 
AREA PERFORMANCE REPORT – FQ3 2022/23 
1 Background 
1.1 This paper presents the Area Performance Report for Financial Quarter 3 2022/23
(October to December 2022) and illustrates the agreed performance measures. 
1.2 The features of the Performance Report are as follows:- 
 Indicators are grouped by Corporate Outcome.
 The data table for each indicator is coded to identify the level of reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white 
 Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and three previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the responsible officer.
o Where possible performance is presented at both Area and Council
level. 
It should be noted that Pyramid remains live and all measures can be navigated
as usual through the front screen. If support to navigate Pyramid is required please
email pyramid@argyll-bute.gov.uk 
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee. 
1.4 To improve the response to performance queries, it is requested that either the
Responsible Named Officer or Sonya Thomas are contacted once the Quarterly
Performance Report is received with any queries. This should enable some
queries being resolved or clarified prior to the Area Committee meeting, and
therefore being carried forward as Actions at a subsequent meeting.   
2 Recommendations 
Page 11 Agenda Item 8

Page 12

2 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented. 
b) Upon receipt of the Quarterly Performance Report the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any
queries. 
c) Note that work is ongoing and to respond to Sonya Thomas with requests
or comments regarding the layout and format of the Performance Report. 
3.0 IMPLICATIONS 
3.1 Policy: None
3.2 Financial: None
3.3 Legal: None
3.4 HR: None
3.5 Fairer Scotland Duty: No impact assessment required for this report. 
3.5.1 Equalities: None. If requested the Area Committee Performance Report
can be supplied in a different format.
3.5.2 Socio-economic Duty: None
3.5.3 Islands: None 
3.6 Climate Change: None
3.7 Risk: None
3.8 Customer Service: None 
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Head of Customer Support Services
8 February 2023 
For further information, please contact:
Sonya Thomas
Organisation Development Officer - Performance and Improvement
Customer Support Services
01546 604454 
Appendix 1: FQ3 2022/23 MAKI Performance Report 
Page 12

Page 13

Appendix 1
Page 1 
Performance Reporting
Performance Reporting .............................................................................................................................................................................................................................. 1
All Areas .................................................................................................................................................................................................................................................. 4
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 5
COI – Maximise distribution of Scottish Welfare Fund ................................................................................................................................................................. 5
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 6
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention ...................... 6
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 7
Number of parking penalty notices issued – Mid Argyll, Kintyre and Islay .................................................................................................................................. 7
Number of parking penalty notices issued – Argyll and Bute ....................................................................................................................................................... 7
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 8
Car parking income to date – Mid Argyll, Kintyre and Islay .......................................................................................................................................................... 8
Car parking income to date – Argyll and Bute ............................................................................................................................................................................... 9
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................. 10
Dog fouling – total number of complaints – Mid Argyll, Kintyre and Islay ................................................................................................................................. 10
Dog fouling – total number of complaints – Argyll and Bute ...................................................................................................................................................... 10
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 11
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place .... 11
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 12
COI – Provide quality meals with cost margins to all pupils ....................................................................................................................................................... 12
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all .......................................................................................................... 13
Maximise the percentage of 16-19 years olds participating in education, training or employment – Mid Argyll, Kintyre and Islay ...................................... 13
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute ................ 13
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 14
Page 13

Page 14

Appendix 1
Page 2 
Number of affordable social sector new builds completed per annum – Mid Argyll, Kintyre and Islay ................................................................................... 14
Number of affordable social sector new builds completed per annum – Argyll and Bute ........................................................................................................ 14
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 15
Percentage of pre-planning application enquiries processed within 20 working days – Mid Argyll, Kintyre and Islay ........................................................... 15
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute ................................................................................ 15
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 16
Householder planning applications – average number of weeks to determine – Mid Argyll, Kintyre and Islay ...................................................................... 16
Householder planning applications – average number of weeks to determine – Argyll and Bute ........................................................................................... 16
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 18
COI – The number of new homeless applicants who required temporary accommodation this period .................................................................................. 18
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 19
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal .................................................... 19
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 20
COI – Increase the number of community benefits that are delivered through contracts we award locally ........................................................................... 20
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 21
Street lighting – percentage of faults repaired within 10 days – Mid Argyll, Kintyre and Islay ................................................................................................. 21
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute .......................................................................................... 22
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 23
Total number of complaints regarding waste collection – Mid Argyll, Kintyre and Islay .......................................................................................................... 23
Total number of complaints regarding waste collection – Argyll and Bute ............................................................................................................................... 23
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 24
COI – Percentage of waste recycled, composted and recovered ................................................................................................................................................ 24
Shanks – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 24
Islands – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 25
H&L – Percentage of waste recycled, composted and recovered ............................................................................................................................................... 25
Page 14

Page 15

Appendix 1
Page 3 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 27
COI – The number of tonnes of waste sent to landfill ................................................................................................................................................................. 27
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 28
LEAMS (Local Environment Audit and Management System) – Mid Argyll................................................................................................................................ 28
LEAMS (Local Environment Audit and Management System) – Kintyre ..................................................................................................................................... 28
LEAMS (Local Environment Audit and Management System) – Islay ......................................................................................................................................... 29
LEAMS (Local Environment Audit and Management System) – Argyll and Bute ....................................................................................................................... 29
Making It Happen.............................................................................................................................................................................................................................. 30
Teacher sickness absence – Mid Argyll, Kintyre and Islay ........................................................................................................................................................... 30
Teacher sickness absence – Argyll and Bute ................................................................................................................................................................................ 30
Making It Happen.............................................................................................................................................................................................................................. 31
LGE staff (non-teacher) sickness absence – Mid Argyll, Kintyre and Islay .................................................................................................................................. 31
LGE staff (non-teacher) sickness absence – Argyll and Bute ....................................................................................................................................................... 31
Making It Happen.............................................................................................................................................................................................................................. 32
COI – Increase the percentage of all self-service automated contacts ....................................................................................................................................... 32 
Page 15

Page 16

Appendix 1
Page 4 
All Areas 
FQ3 2022/23 Overall Performance Summary 
The information presented is a summary of the measures that are available on Pyramid. 
Unless stated otherwise, performance is presented at both Area and Council-wide levels. 
The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend. 
The data table for each indicator is colour coded to identify the level of reporting: 
 Area level measures are blue.
 Council level measures are grey.
 Corporate Outcome Indicators (COIs) are white. 
Where the measure is appropriate a Performance Trend Line has been added to illustrate performance over the reporting period. 
Page 16

Page 17

Appendix 1
Page 5 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Maximise distribution of Scottish Welfare Fund 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2021/22 95.3% 120.7% Green
FQ1 2022/23 95.3% 87.5% Red
FQ2 2022/23 95.3% 115.1% Green
FQ3 2022/23 95.3% 129.2% Green 
The Performance has exceeded target and actual has increased since the last reporting period. 
FQ3 Comment 
The Council is maximising the distribution of this fund to support vulnerable people on low incomes tackle the cost of living challenges. As at 31 December spend
on the fund is £444,000 and is projected to increase to £624,000 by the end of March 2023. This is well above the annual budget of £458,338. The Scottish
Government has distributed more grant funding to Councils nationally to support them with the overspend and there is specific grant funding in earmarked
reserves to cover the overspend this year. Therefore there is no issue with the position in terms of overall available finance the importance is ensuring as many
households are support as possible during challenging times.   
Responsible person: Fergus Walker 
Page 17

Page 18

Appendix 1
Page 6 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and
intervention 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2021/22 100% 100% Green
FQ1 2022/23 100% 100% Green
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green 
This indicator for FQ3 has met the target with no change in performance since the last reporting period. 
FQ3 Comment
All of the clients provided with a Personal Debt Recovery Action Plan were satisfied. Out of 11 surveys issued 11 were returned showing 100% of clients satisfied. 4
of the 11 survey returns had comments showing their appreciation of the service and how it had helped them.
Responsible person: Lee Roberts 
Page 18

Page 19

Appendix 1
Page 7 
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 3 No target 
FQ1 2022/23 No target 44 No target
FQ2 2022/23 No target 64 No target
FQ3 2022/23 No target 8 No target 
The indicator for FQ3 shows the number of parking penalty notices has decreased significantly since the last reporting period. 
FQ3 Comment
Inveraray car parks free until April.
Responsible person: Hugh O’Neill 
Number of parking penalty notices issued – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 1,188 No target 
FQ1 2022/23 No target 2,043 No target
FQ2 2022/23 No target 2,124 No target
FQ3 2022/23 No target 1,343 No target 
This indicator for FQ3 shows the number of parking penalty notices has decreased since the last reporting period. 
FQ3 Comment
Free parking before Christmas extended to 16 days, Pier Car Park in Helensburgh unenforceable at present and various lining issues throughout Argyll and Bute.
Responsible person: Hugh O’Neill 
Page 19

Page 20

Appendix 1
Page 8 
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Mid Argyll, Kintyre and Islay 
Performance is presented cumulatively for both Area and Council-wide levels. For individual car parks, the income is presented on a quarterly basis. 
Reporting Period
2022/23
Target
(Cumulative)
Actual
(Cumulative)
Status
FQ4 2021/22 £61,820 £69,891 Green
FQ1 2022/23 £16,057 £15,541 Red
FQ2 2022/23 £40,065 £39,813 Red
FQ3 2022/23 £52,075 £61,366 Green 
This indicator for FQ3 shows the cumulative amount of income collected has exceeded the cumulative target. There is no Performance Trend Line as this data is
cumulative. 
FQ3 Comment
To the end of FQ3, the area income is showing an additional £9,291. Officers are unable to provide a definitive reason for the income over the anticipated budget. 
Responsible person: Hugh O’Neill 
Actual quarterly income collected in Mid Argyll, Kintyre and Islay during FQ2 and FQ3. 
Car Park Location FQ2 Actual FQ3 Actual
Fisher Row, Inveraray £3,981 £3,597
The Avenue, Inveraray £6,068 £9,355
Front Street and Toilets, Inveraray £14,223 £8,601
Lorne Street, Lochgilphead £0 £0
MAKI £0 £0 
Page 20

Page 21

Appendix 1
Page 9 
Car parking income to date – Argyll and Bute 
Performance is presented cumulatively for both Area and Council-wide levels. 
Reporting Period  Target
(Cumulative)
Actual
(Cumulative)
Status
FQ4 2021/22 £807,078 £801,606 Red
FQ1 2022/23 £250,661 £165,678 Red
FQ2 2022/23 £625,430 £491,453 Red
FQ3 2022/23 £812,919 £709,585 Red 
This indicator for FQ3 shows the cumulative amount of income collected is significantly lower than the cumulative target. There is no Performance Trend Line as
this data is cumulative. 
FQ3 Comment 
Improved income in both MAKI and H&L areas but overall there is an under-recovery in income of £103,334. It is difficult to ascertain the exact reasons for under-
recovery in parking income however it can be affected by such things as events, weather, commuting and a delay in processing of cash or credit/debit card
payments can also be a factor. The impact of the waiving of charges for events in car parks, waiving charges in off-street car parks during winter festivals will likely
have affected outturn.  
Responsible person: Hugh O’Neill 
Page 21

Page 22

Appendix 1
Page 10 
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 21 No target 
FQ1 2022/23 No target 26 No target
FQ2 2022/23 No target 19 No target
FQ3 2022/23 No target 15 No target 
This indicator for FQ3 shows the number of dog fouling complaints has decreased since the last reporting period. 
FQ3 Comment
The number of dog fouling complaints has remained the same this quarter for the Mid Argyll area, with a total of 7. The Kintyre area saw a drop in complaints this
quarter down to 8. The Isle of Islay received no dog fouling complaints this quarter. The Warden Service will ensure they continue with their patrols as often as can
be assigned.
Responsible person: Tom Murphy 
Dog fouling – total number of complaints – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 81 No target 
FQ1 2022/23 No target 61 No target
FQ2 2022/23 No target 45 No target
FQ3 2022/23 No target 47 No target 
This indicator for FQ3 shows the number of dog fouling complaints has increased slightly since the last reporting period. 
FQ3 Comment
There were a total of 47 dog fouling complaints received this quarter, although this is down slightly on last quarter, the Warden service will continue monitoring,
patrolling and educating on the issues of dog fouling in an attempt to reduce the number of complaints further, however it is difficult to catch a person committing
an offence as the majority of the complainants wish to remain anonymous.
Responsible person: Tom Murphy 
Page 22

Page 23

Appendix 1
Page 11 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring
plans in place 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2021/22 100% 100% Green
FQ1 2022/23 100% 100% Green
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green 
This indicator for FQ3 is on track with no change in performance since the last reporting period. 
FQ3 Comment
There is individual tracking and monitoring in place on SEEMIS in schools for care experienced children and young people. In addition to this, the Principal Teacher
for care experienced children and young people monitors the information in SEEMIS and has subsequent conversations with staff in schools to ensure care
experienced children and young people are receiving all the support they need to achieve and that the staff in school have the right strategies in place to help the
child remain engaged with their education attainment and achievement. Often the care experienced health and wellbeing officers are used to provide extra
support for the child and the family.
Responsible person: Louise Lawson 
Page 23

Page 24

Appendix 1
Page 12 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Provide quality meals with cost margins to all pupils 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 5.00% -4.00% Green 
FQ1 2022/23 5.00% 3.77% Green
FQ2 2022/23 5.00% 0.98% Green
FQ3 2022/23 5.00% 6.09% Red 
This indicator for FQ3 is above target and performance has decreased since the last reporting period. 
FQ3 Comment
Total Percentage variance for Argyll and Bute 6.09%. This is slightly over the target variance of 5%. We will continue to monitor any locations continuing to have
food cost percentages over this target.
Responsible person: Jayne Jones 
Page 24

Page 25

Appendix 1
Page 13 
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 94.00% 95.38% Green 
FQ1 2022/23 94.00% 95.45% Green
FQ2 2022/23 94.00% 96.72% Green
FQ3 2022/23 94.00% 94.30% Green 
This indicator for FQ3 is above target however performance has decreased since the last reporting period. 
FQ2 Comment
As of 09/12/2022, the participation figure for MAKI was 94.30%. This is 0.4% above the Argyll and Bute participation figure of 93.90% for 2021/22.
Responsible person: Simon Easton 
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and
Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 94.00% 93.80% Red 
FQ1 2022/23 94.00% 94.00% Green
FQ2 2022/23 94.00% 93.90% Red
FQ3 2022/23 94.00% 93.90% Red 
This indicator for FQ3 is slightly below target. 
FQ3 Comment
The Annual Participation Measure for 2021/22 was released on 31st August 2022. In Argyll and Bute 93.90% of young people aged 16-19 were participating (in
work, training or education). This figure is 0.4% above the national average, (which is 93.5%). In total 3.8% of 16-19 year olds were not participating, which is 0.2%
below the national average, and 2.3% were unconfirmed, which is 1.3% below the national average.
As of 9 December 2022, the most up to date participation figure for Argyll and Bute stood at 93.92%.
Responsible person: Simon Easton
Page 25

Page 26

Appendix 1
Page 14 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Number of affordable social sector new builds completed per annum – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 8 8 Green 
FQ1 2022/23 18 18 Green
FQ2 2022/23 10 10 Green
FQ3 2022/23 1 1 Green 
This indicator for FQ3 has met the target for the reporting period. 
Number of affordable social sector new builds completed per annum – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 45 45 Green 
FQ1 2022/23 36 36 Green
FQ2 2022/23 48 48 Green
FQ3 2022/23 37 37 Green 
This indicator for FQ3 has met the target for the reporting period. 
FQ3 Comment
37 units were completed in FQ3.
Responsible person: Alan Brandie 
Bute and Cowal – no units were completed.
Helensburgh and Lomond – no units were completed.
Mid Argyll, Kintyre and Islay – Argyll Community Housing Association Development at Millknowe: 1 wheelchair accessible (1 x 2 Bed Ground Floor Wheelchair Flat)
Oban, Lorn and The Isles – Link Group Development at Dunbeg: 34 General Needs (2 x 1 Bed 2 Person Flat, 2 x 2 Bed 4 Person Flat, 20 x 2 Bed 4 Person House, 7 x 3
Bed 6 Person House, 3 x 4 Bed 7 person House), 1 Amenity (1 x 1 bed 2 Person Amenity Flat), 1 wheelchair accessible (1 x 1 Bed 2 Person Wheelchair Flat) 
Page 26

Page 27

Appendix 1
Page 15 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 75.0% 32.4% Red 
FQ1 2021/22 75.0% 31.6% Red
FQ2 2021/22 75.0% 35.0% Red
FQ3 2022/23 75.0% 36.0% Red 
This indicator for FQ3 is below target however performance has improved slightly since the last reporting period. 
FQ3 Comment
The team processed 36% of pre-applications enquiries within 20 working days against a target of 75%. It is important for readers to note the direct correlation
between a team which is significantly under-resourced and the resulting performance. The Development Manager continues to perform the role of Area Team
Leader in addition to their own duties, as has been the case for well over a year now; the new Area Team Leader is due to start in February. Statutory functions
remain the priority. MAKI also has further reduced resource due to 1 FTE currently being on maternity leave.      Responsible person: Peter Bain 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 75.0% 56.3% Red 
FQ1 2022/23 75.0% 60.5% Red
FQ2 2022/23 75.0% 64.7% Red
FQ3 2022/23 75.0% 52.5% Red 
This indicator for FQ3 is below target however performance has decreased since the last reporting period. 
FQ3 Comment
With 52.5% of pre-applications being processed within the target of 20 working days, it is accepted that the performance of handling of pre apps is currently below
expected standards it should however be recognised that the service is currently operating with reduced resource and high volume of statutory case work. Pre
applications are non-statutory case work items and therefore afforded a lower priority in relation to statutory casework and is reflected in reduced standard of
performance at this time.      Responsible person: Peter Bain 
Page 27

Page 28

Appendix 1
Page 16 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 8.0 weeks 14.4 weeks Red 
FQ1 2022/23 8.0 weeks 15.3 weeks Red
FQ2 2022/23 8.0 weeks 18.8 weeks Red
FQ3 2022/23 8.0 weeks 15.3 weeks Red 
This indicator for FQ3 has not met the target however performance has improved since the last reporting period. 
FQ3 Comment
This measure only relates to planning applications received for alterations to existing premises.
The Mid Argyll, Kintyre and Islay team took an average of 15.3 weeks to determine householder applications in FQ3. It is important for readers to note the direct
correlation between a team which is significantly under-resourced and the resulting performance. The Development Manager continues to perform the role of
Area Team Leader in addition to their own duties, as has been the case for well over a year now. Whilst Officers may be processing householder applications
timeously, they are being held up awaiting managerial scrutiny and sign off which is a result of reduced resource. MAKI also has further reduced resource due to 1
FTE currently being on maternity leave, but the new Area Team Leader is due to start in February.
Responsible person: Peter Bain 
Householder planning applications – average number of weeks to determine – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 8.0 weeks 13.8 weeks Red 
FQ1 2022/23 8.0 weeks 12.4 weeks Red
FQ2 2022/23 8.0 weeks 13.1 weeks Red
FQ3 2022/23 8.0 weeks 12.0 weeks Red 
This indicator for FQ3 has not met the target however performance has improved since the last reporting period. 
FQ3 Comment
This measure only relates to planning applications received for alterations to existing premises.
Page 28

Page 29

Appendix 1
Page 17 
Although a reduction of 1 week in average turnaround time was achieved on the last FQ, the headline performance figure of 12 weeks remains 50% above target.
Much of this is attributable to the MAKI team where the Development Manager continues to perform the role of Area Team Leader in addition to his own duties,
as has been the case for well over a year now. Whilst Officers may be processing householder applications timeously they are being held up awaiting managerial
scrutiny and sign off.
Responsible person: Peter Bain 
Benchmarking
The year-end statistics from The Scottish Government were published on 31st August. FY21/22 benchmarking figures have now been updated and FY22/23 have
been forward projected in the usual way. Readers should note that our own Pyramid data in Development Management measures is "unadjusted", whereas that
of the benchmarks (represented by the blue and green columns on the graph) is adjusted for "clock-stopping". Clock-stopping is where The Scottish Government
allow for the removal of specific time periods for identified applications where delays were out with the control of the Local Planning Authority. 
Page 29

Page 30

Appendix 1
Page 18 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – The number of new homeless applicants who required temporary accommodation this period 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 37 No target 
FQ1 2022/23 No target 32 No target
FQ2 2022/23 No target 28 No target
FQ23 2022/23 No target 41 No target 
This indicator for FQ3 shows the number of applicants has increased since the last reporting period. 
FQ3 Comment
During FQ3, the housing service provided temporary accommodation for 41 new homeless households.
Responsible Person: Morven Macintyre 
Bute and Cowal – 15
Helensburgh and Lomond – 7
Oban, Lorn and the Isles – 15
Mid Argyll, Kintyre and Islay – 4 
Page 30

Page 31

Appendix 1
Page 19 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 20.0% 13.5% Red 
FQ1 2022/23 20.0% 13.2% Red
FQ2 2022/23 20.0% 22.2% Green
FQ3 2022/23 20.0% 19.4% Red 
This indicator for FQ3 is below target and performance has decreased since the last reporting period. 
FQ3 Comment
19.4% - of the 11 bids made by local contractors, 7 were awarded the contract with a total value of over £139k. A summary of all contracts awarded in FQ3 is
available on Pyramid. The Procurement, Commercial and Contract Management Team continue to support local suppliers by providing useful information on the
Council’s website i.e. pre-recorded webinars on how to bid for Council contracts, hints and tips for tendering as well as our contract plan, details of upcoming
supplier development events and our category officer’s contact details all of which enable local suppliers to be able to bid for our contracts.
Responsible person: Anne MacColl-Smith 
Page 31

Page 32

Appendix 1
Page 20 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Increase the number of community benefits that are delivered through contracts we award locally 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2021/22 No target 40 No target
FQ1 2022/23 No target - No target
FQ2 2022/23 No target 30 No target
FQ3 2022/23 No target - No target 
This indicator for FQ2 shows the number of community benefits since the last reporting period. 
FQ2 Comment
This indicator is reported in FQ2 and FQ4.
The team has been working closely with their suppliers to deliver additional social, economic and environmental value and achieved 30 community benefits
through Contract Management, Contract Awards and the Request List from 1st April 2022 to 30th September 2022. A summary of all contracts awarded in FQ2 is
available on Pyramid.
Responsible person: Anne MacColl-Smith 
Page 32

Page 33

Appendix 1
Page 21 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 75% 48% Red 
FQ1 2022/23 75% 33% Red
FQ2 2022/23 75% 47% Red
FQ3 2022/23 75% 44% Red 
This indicator for FQ3 is below target and performance has decreased slightly since the last reporting period. 
FQ3 Comment
We provide a network of almost 15,000 streetlights across the Council area which is maintained by a team of 3 full time electricians and 1 apprentice electrician. In
this last quarter we had 383 reported faults which means the performance in terms of the percentage of the network operational is in the region of 97.5%.     
In this quarter we have completed 79% more jobs than in the last quarter (383 vs 214). While the percentage of jobs completed on time has dropped, the overall
number of jobs completed has increased significantly.     
As well as attending to the day-to-day fault reports our street lighting team are progressing with the final stages of the LED scheme which will see all of our
network upgraded to a more energy efficient, more cost effective – this has already significantly reduced our carbon footprint. We will also be progressing a street
lighting capital programme of column replacements thanks to last year’s budget allocation.     
Overall the street lighting team performs well in both maintaining and improving the network. This particular performance indicator is not necessarily reflective of
the good work of the team and consideration is being given to other measures which could provide Members with a more comprehensive indication of lighting
performance. 
Responsible person: Tom Murphy 
Page 33

Page 34

Appendix 1
Page 22 
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 75% 28% Red 
FQ1 2022/23 75% 29% Red
FQ2 2022/23 75% 48% Red
FQ3 2022/23 75% 30% Red 
This indicator for FQ3 is below target and performance has decreased significantly since the last reporting period. 
FQ3 Comment
We provide a network of almost 15,000 streetlights across the Council area which is maintained by a team of 3 full time electricians and 1 apprentice electrician. In
this last quarter we had 383 reported faults which means the performance in terms of the percentage of the network operational is in the region of 97.5%.     
In this quarter we have completed 79% more jobs than in the last quarter (383 vs 214). While the percentage of jobs completed on time has dropped, the overall
number of jobs completed has increased significantly.     
As well as attending to the day-to-day fault reports our street lighting team are progressing with the final stages of the LED scheme which will see all of our
network upgraded to a more energy efficient, more cost effective – this has already significantly reduced our carbon footprint. We will also be progressing a street
lighting capital programme of column replacements thanks to last year’s budget allocation.     
Overall the street lighting team performs well in both maintaining and improving the network. This particular performance indicator is not necessarily reflective of
the good work of the team and consideration is being given to other measures which could provide Members with a more comprehensive indication of lighting
performance. 
Responsible person: Tom Murphy 
Page 34

Page 35

Appendix 1
Page 23 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Total number of complaints regarding waste collection – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 1 No target 
FQ1 2022/23 No target 3 No target
FQ2 2022/23 No target 8 No target
FQ3 2022/23 No target 2 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased since the last reporting period. 
FQ3 Comment
There were only 2 waste collection complaints received this quarter for the Kintyre area. Given the number of domestic and commercial properties serviced this is
a very good level of service. Again this quarter for Mid Argyll and the Isle of Islay there were no waste collection complaints received. This is an excellent level of
service provided by the waste collection service given the number of properties serviced.
Responsible person: Tom Murphy 
Total number of complaints regarding waste collection – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 40 No target 
FQ1 2022/23 No target 58 No target
FQ2 2022/23 No target 65 No target
FQ3 2022/23 No target 35 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased significantly since the last reporting period. 
FQ3 Comment
The number of waste collection complaints has dropped from 65 last quarter to 35 this quarter. The Helensburgh/Lomond area received the majority of
complaints with 23, however given the operational and staffing difficulties and the number of domestic and commercial properties serviced this is still a good level
of service.
Responsible person: Tom Murphy 
Page 35

Page 36

Appendix 1
Page 24 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 45.0% 48.3% Green 
FQ1 2022/23 45.0% 52.1% Green
FQ2 2022/23 45.0% 50.5% Green
FQ3 2022/23 45.0% 56.7% Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment
56.7% recycling/composting and recovery (39.7% recycling composting and 17.0% recovery). Recovery is higher than normal this quarter due to a trial by Renewi
(formerly Shanks), who have taken some residual general waste for disposal from their Moleigh (by Oban) and Dalinlongart (by Dunoon) facilities to an energy
from waste (EFW) plant near Edinburgh. This has reduced landfill overall and has more than offset the reduction in recovery from the Helensburgh and Lomond
area following on from The Scottish Government Landfill Tax Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental no longer
carry out any recovery from mixed residual general waste.
Responsible person: John Blake 
Shanks – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 49.7% No target 
FQ1 2022/23 No target 54.4% No target
FQ2 2022/23 No target 58.1% No target
FQ3 2022/23 No target 67.4% No target 
This indicator for FQ3 shows the percentage of waste recycled has increased since the last reporting period.
Page 36

Page 37

Appendix 1
Page 25 
FQ3 Comment
67.4.% recycling/composting and recovery (40.0% recycling/composting and 27.4% recovery). Recovery is higher than normal this quarter due to a trial by Renewi
(formerly Shanks), who have taken some residual general waste for disposal from their Moleigh (by Oban) and Dalinlongart (by Dunoon) facilities to an energy
from waste (EFW) plant near Edinburgh.
Responsible person: John Blake 
Islands – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 38.4% No target 
FQ1 2022/23 No target 33.3% No target
FQ2 2022/23 No target 34.7% No target
FQ3 2022/23 No target 43.5% No target 
This indicator for FQ3 shows the percentage of waste recycled has increased since the last reporting period. 
FQ3 Comment
43.5% recycling/composting and recovery (43.5% recycling/composting and 0% recovery). Landfill has reduced this quarter mainly due to seasonality i.e. less
landfilled during late autumn/winter months with fewer visitors on islands. Year to date recycling/composting and recovery figure is 37.0% (i.e. 36.7% recycling/
composting and 0.3% recovery).
Responsible person: John Blake 
H&L – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 48.9% No target 
FQ1 2022/23 No target 53.6% No target
FQ2 2022/23 No target 41.0% No target
FQ3 2022/23 No target 37.5% No target
Page 37

Page 38

Appendix 1
Page 26 
This indicator for FQ3 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ3 Comment
37.5% recycling/composting and recovery (37.5% recycling/composting and 0% recovery). Following a Scottish Government Landfill Tax Abatement Order (which
commenced from 1st July 2022), Barr Environmental no longer carry out any recovery from mixed general waste delivered to them from Helensburgh and Lomond
area. Year to date figures for H&L are 43.5% recycling/composting and recovery (40.6% recycling/composting and 2.9% recovery).
Responsible person: John Blake 
Page 38

Page 39

Appendix 1
Page 27 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – The number of tonnes of waste sent to landfill 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 5,000 4,252 Green 
FQ1 2022/23 5,850 4,546 Green
FQ2 2022/23 5,550 4,947 Green
FQ3 2022/23 5,100 3,882 Green 
This indicator for FQ3 is below target (lowest is best) and performance has increased since the last reporting period. 
FQ3 Comment
Landfill tonnages have dropped this quarter partly due to seasonality but mainly because of a trial by Renewi (formerly Shanks), who have taken some residual
general waste for disposal from their Moleigh (by Oban) and Dalinlongart (by Dunoon) facilities to an energy from waste (EFW) plant near Edinburgh. This has
reduced landfill overall and has more than offset the reduction in recovery from the Helensburgh and Lomond area following on from The Scottish Government
Landfill Tax Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental no longer carry out any recovery from mixed residual general
waste.
Responsible person: John Blake 
Page 39

Page 40

Appendix 1
Page 28 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
LEAMS (Local Environment Audit and Management System) – Mid Argyll
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 73 85 Green 
FQ1 2022/23 73 88 Green
FQ2 2022/23 73 82 Green
FQ3 2022/23 73 82 Green 
This indicator for FQ3 is above target with no change in performance since the last reporting period. 
FQ3 Comment
The level of street cleanliness again this quarter in Mid Argyll is very good, October 73, November 92 and December 80.
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Kintyre
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 73 77 Green 
FQ1 2022/23 73 82 Green
FQ2 2022/23 73 81 Green
FQ3 2022/23 73 81 Green 
This indicator for FQ3 is above target with no change in performance since the last reporting period. 
FQ3 Comment
The level of street cleanliness on Kintyre remains high again this quarter and well exceeds the National standard and benchmark figures. October 84, November 82
and December 78, this is a very good level of service.
Responsible person: Tom Murphy 
Page 40

Page 41

Appendix 1
Page 29 
LEAMS (Local Environment Audit and Management System) – Islay
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 73 84 Green 
FQ1 2022/23 73 84 Green
FQ2 2022/23 73 84 Green
FQ3 2022/23 73 84 Green 
This indicator for FQ3 is above target with no change in performance since the last reporting period. 
FQ3 Comment
The Islay performance of street cleanliness remains high again this quarter, each month showing a performance score of 84, exceeding both the National Standard
Score of 67 and Benchmarking Figure of 73.
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Argyll and Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 73 79 Green 
FQ1 2022/23 73 85 Green
FQ2 2022/23 73 82 Green
FQ3 2022/23 73 83 Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment
The level of street cleanliness for the whole area remains high, this is excellent and the role of the Amenity Warden has had a key influence around littering and
dog fouling to assist in maintaining the very good level of performance.
Responsible person: Tom Murphy 
Page 41

Page 42

Appendix 1
Page 30 
Making It Happen 
Teacher sickness absence – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 1.69 days No target 
FQ1 2022/23 No target 1.62 days No target
FQ2 2022/23 No target 1.26 days No target
FQ3 2022/23 No target 1.80 days No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment
Work days lost has increased by just over half a day on last quarter and by just under half a day on the same quarter last year. 
Responsible person: Simon Easton 
Teacher sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 1.77 days No target 
FQ1 2022/23 No target 1.79 days No target
FQ2 2022/23 No target 1.22 days No target
FQ3 2022/23 No target 1.70 days No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment
Work days lost have increased by almost half a day on last quarter but are similar to the same quarter last year. The top three reasons for sickness absence are: 
infections, stress/depression/mental health and stomach/liver/kidney & digestion.  Education have a dedicated Attendance Assistant that supports Head Teachers
to manage attendance.  To support with Stress related absences the Wellbeing Team have been trailing Active Care - a week one referral service to the Employee
Assistance Programme to support employees with appropriate interventions in early days of absence.  The Wellbeing Team have also co-ordinated the Recalibrate
Programme which was 12 weeks’ worth of online coaching attended by over 80 employees to support them to improve their own wellbeing.  The Wellbeing Team
have also just launched an online physiotherapy pilot and it is hoped members of Education will benefit from group sessions regarding musculoskeletal health.
Responsible person: Simon Easton
Page 42

Page 43

Appendix 1
Page 31 
Making It Happen 
LGE staff (non-teacher) sickness absence – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 2.82 days No target 
FQ1 2022/23 No target 2.87 days No target
FQ2 2022/23 No target 3.16 days No target
FQ3 2022/23 No target 3.08 days No target 
This indicator for FQ3 shows the number of sickness absence days has decreased slightly since the last reporting period. 
FQ3 Comment
Work days lost has very slightly decreased on the last quarter and stayed the same against the same quarter last year. 
Responsible person: Carolyn Cairns 
LGE staff (non-teacher) sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 3.42 days No target 
FQ1 2022/23 No target 3.57 days No target
FQ2 2022/23 No target 3.66 days No target
FQ3 2022/23 No target 3.65 days No target 
This indicator for FQ3 shows the number of sickness absence days has decreased slightly since the last reporting period. 
FQ3 Comment
The top three reasons for absence were Stress/Depression/Mental Health; Heart, Blood Pressure and Circulatory and Other Musculoskeletal problems.  To support
with Stress related absences the Wellbeing Team have been trailing Active Care - a week one referral service to the Employee Assistance Programme to support
employees with appropriate interventions in early days of absence.  The Wellbeing Team have also co-ordinated the Recalibrate Programme which was 12 weeks’
worth of online coaching attended by over 80 employees to support them to improve their own wellbeing.  The Wellbeing Team have also just launched an online
physiotherapy pilot and it is hoped members of Roads and Infrastructure and HSCP will benefit from
Responsible person: Carolyn Cairns
Page 43

Page 44

Appendix 1
Page 32 
Making It Happen 
COI – Increase the percentage of all self-service automated contacts 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 70.0% 73.1% Green 
FQ1 2022/23 70.0% 79.4% Green
FQ2 2022/23 70.0% 75.4% Green
FQ3 2022/23 70.0% 72.5% Green 
This indicator for FQ3 is above target however performance has decreased since the last reporting period. 
FQ3 Comment
In FQ3 there were 33,921 transactions dealt with by customer service agents (27.5%) and 89,449 automated or self-service transaction (72.5%) so the 70% target
was exceeded. FQ3 2021/22 2022/23 Mediated 36,387 33.921 Automated 94,272 89,449.
Responsible person: Robert Miller 
Page 44

Page 45

ARGYLL AND BUTE COUNCIL                                        MID ARGYLL, KINTYRE
AND THE ISLANDS AREA
COMMITTEE                                                                                                         
ROADS AND INFRASTRUCTURE                          01 MARCH 2023
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 A Roads and Infrastructure standing report was a fixture on Area Committee
agendas throughout the life of the last Council. In the first two rounds of Area
Committee meetings in the new Council feedback was sought on the value of
these updates, and their format and frequency. Generally Members felt having a
standard item was beneficial and it was acknowledged that the Roads and
Infrastructure weekly briefings issued to all members each Friday afternoon
provide for the main sources of live information on current activities. On top of
these briefings there is a bank of resources on the new Member Zone system
which include the weekly briefings, subject specific briefings, ad hoc short
briefings on issues, relevant previous committee reports, operational service
procedures, legislation and Council policies. 
1.2 In the last Council the purpose of these reports was to provide an update on
service activities but since weekly briefings were introduced around 18 months
ago [at the time of writing this report we are on to briefing Edition 81] these have
largely superseded the original stated purpose of these reports. 
1.3 On the basis of the above this new format has been agreed through the
December round of area committees for this standing item. This format 
removes duplication for Officers and rather links to existing published
information, with additional updates only in the body of the reports if these are
specifically requested/noted from previous meetings. The report remains as a
standing item and continues to provide the opportunity for Officer engagement at
the committee meetings.   
2.0 RECOMMENDATIONS 
It is recommended that the Area Committee: 
2.1 Note and consider the contents of this report. 
Page 45 Agenda Item 9

Page 46

3.0 DETAIL 
3.1 Roads and Infrastructure Services provides Members with weekly briefings on
topical service activities which are all available here.   
3.2 As part of the resources on the new Member Zone system there are various key
documents available in an online library here. 
4.0 CONCLUSION 
4.1 This report provides links to existing published information on service activities
and provides for the opportunity for Officer attendance and engagement at
committee meetings. 
5.0 IMPLICATIONS 
5.1 Policy – none 
5.2 Financial – none 
5.3  Legal – none 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – none known 
5.5.2   Socio-economic Duty – none known 
5.5.3 Islands – none known 
5.6. Climate Change – none 
5.7  Risk – none known 
5.8  Customer Service - none 
Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
January 2023                                                  
For further information contact: 
Page 46

Page 47

Jim Smith, Head of Roads and Infrastructure Services; or Mark Calder, Project
Manager 
Page 47

Page 48

This page is intentionally left blank

Page 49

ARGYLL AND BUTE COUNCIL  MAKI AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
1 MARCH 2023 
HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) – ANNUAL UPDATE 
1.0 EXECUTIVE SUMMARY
1.1 The main purpose of this report is to update Members of Housing Services
activity within the Mid Argyll, Kintyre and the Islands area. 
This report will detail the following housing activity:-
 Housing Need and Demand
 Homelessness
 Affordable Housing Supply - Strategic Housing Investment Programme
(SHIP)
 Empty Homes
 Private Sector Housing Grant Adaptations
 Private Sector Housing Grant Repairs and Improvements
 Energy Efficiency - Home Energy Efficiency Programme: Area Based
Scheme(HEEP:ABS)
 Local Housing Strategy 
RECOMMENDATIONS 
Members are asked to consider the content of this report. 
Page 49 Agenda Item 11

Page 50

ARGYLL AND BUTE COUNCIL  MAKI AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
1 MARCH 2023 
HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) – ANNUAL UPDATE 
2.0 INTRODUCTION
2.1 The main purpose of this report is to update Members of Housing Services 
activity and the delivery of the Local Housing Strategy within the Mid Argyll,
Kintyre and the Islands area. 
This report will detail the following housing activity:-
 Housing Need and Demand
 Homelessness
 Affordable Housing Supply - Strategic Housing Investment Programme 
 Empty Homes
 Private Sector Housing Grant Adaptations
 Private Sector Housing Grant Repairs and Improvements
 Energy Efficiency – Energy Efficiency Programme: Area Based Scheme
 Local Housing Strategy 
3.0 RECOMMENDATIONS
3.1 Members are asked to consider the content of this report. 
4.0 DETAIL
4.1 As the Strategic Housing Authority for this area, the Council has a series of
important statutory housing functions to fulfil. A Housing Need and Demand
Assessment (HNDA) is carried out every 5 years which enables Scottish
Government funding to be brought into Argyll and Bute primarily to deliver
affordable housing. A comprehensive revision of the local HNDA was
approved as “robust and credible” by the Scottish Government’s Centre for
Housing Market Analysis in December 2021. The Council also produces a
Local Housing Strategy (LHS) every 5 years. The LHS 2022-27 was approved
by Full Council in December 2021.   
The LHS has been developed in accordance with Scottish Government guidance
and local priorities as identified in the new HNDA. .This sets out the vision for
Argyll and Bute: “Everyone in Argyll & Bute has access to a suitable, high
Page 50

Page 51

quality home which is affordable and located within a vibrant, sustainable
and connected community.” This report will detail the housing activity taking
place in Mid Argyll, Kintyre and the Islands. 
4.2 HOUSING NEED AND DEMAND  
HOMEArgyll WAITING LIST November 2022 – Active Applicants  
(excluding applicants with 0 points i.e. no need)                                                           
Minimum Bedroom Size Required TOTAL
0/1beds 2beds 3beds 4+beds
Mid Argyll 154 56 31 12 253
Kintyre 90 42 21 10 163
Islay, Jura & Colonsay 80 32 17 5 134
MAKI TOTAL 324 130 69 27 550 
In addition there was a registered demand from over 215 applicants who
received nil points according to the Common Allocation Policy and therefore
would be deemed not to have a defined housing need. This included 93
applicants for Mid Argyll, 60 for Kintyre, and 62 for Islay, Jura & Colonsay. 
For MAKI as a whole, the majority of applicants (61%) require one bedroom
and 25% require 2 bedrooms.11% require 3 bedrooms and only 3% need 4 or
more. 
However, to establish actual need, the available supply must be factored 
into this, based on the available lets within the RSL stock during a year. 
Applicants per available RSL Let (Pressure Ratios) 
HOMEArgyll
Applicants
RSL Lets 2021/22
(HOMEArgyll only)
Pressure
Ratio
Mid Argyll 253 96 3:1
Kintyre 163 80 2:1
Islay, Jura and Colonsay 134 22 6:1
MAKI Total 550 198 3:1                                                                                                                                           
While the pressure ratios are only one factor in determining need and 
demand, they are useful indicators of areas where further research and 
analysis may be required. 
The fully revised Argyll & Bute HNDA 2021 takes account of a wide range of
factors to determine existing need and future demand for new build housing,
and demographic projections have a critical role in this assessment. Although
the default population projections suggest a significant and continuous decline
across Argyll and Bute, and consequently minimal or zero requirement for new
build housing,  the council has developed ambitious Housing Supply Targets
based on an alternative, positive growth scenario for all areas. In this instance,
9% of the Argyll & Bute Housing requirement would be apportioned to Mid
Argyll; 7% to Kintyre; and around 6% to Islay, Jura & Colonsay. Over the next
Page 51

Page 52

5 years this could amount to at least 318 new builds across all tenures for the
MAKI area as a whole. 
4.3 HOMELESSNESS 
Homeless applications across the area have increased by 11% (123 up to 137)
during 2021/22.  There was reduction of 7 applications in Kintyre but an
increase of 14 applications in Islay, Jura and Colonsay. There was an increase
of 7 applications in Mid Argyll. 
During 2021/22, there were 119 homeless cases closed In the Mid Argyll,
Kintyre and Islay area: Mid Argyll – 62; Kintyre – 35 and Islay, Jura and
Colonsay - 22. 
The graph below illustrates the number of homeless applications and cases
closed for the period from 2017/18 to 2021/22. 
0
20
40
60
80
100
Applications Cases Closed Applications Cases Closed Applications Cases Closed
Islay, Jura and Colonsay Kintyre Mid Argyll
Homeless Applications and Cases Closed
2017/18 -2021/22
2017/18 2018/19 2019/20 2020/21 2021/22
Page 52

Page 53

The main reasons for presenting as Homeless last year were “disputes with
family/relationship breakdown”, “other action by landlord resulting in termination
of tenancy”; and “being asked to leave”. 
Rough Sleeping 
Mid Argyll, Kintyre and Islay experienced a sharp decrease in the incidence of
rough sleeping over the same period last year, with 0 cases (-6) across the area
reporting that they slept rough the night preceding their presentation and 1 (-9)
reporting that they had slept rough in the 3 months preceding their homeless
application. These were disaggregated as follows:- 
AREA Number of Rough Sleepers in 2020/21
Night Before Application 3 Months Prior to Application
Mid Argyll 0 0
Kintyre 0 0
Islay 0 1
MAKI total 0 1
Argyll & Bute 17 28 
0 5 10 15 20 25 30
1. Termination of tenancy/mortgage due to rent…
10. Dispute with household/relationship breakdown:…
11. Fleeing non-domestic violence
12. Harassment
13. Overcrowding
14. Asked to leave
15. Other reason for leaving accommodation/household
2. Other action by landlord resulting in the termination…
3. Applicant terminated secure accommodation
4. Loss of service/tied accommodation
5. Discharge from prison/hospital/car/other institution
7. Forced division and sale of matrimonial home
8. Other reasons for loss of accommodation
9. Dispute with household violent or abusive
Mid Argyll, Kintyre, Islay, Jura and Colonsay
Reasons for Homelessness 2021/22
Mid Argyll Kintyre Islay, Jura and Colonsay
Page 53

Page 54

4.4 AFFORDABLE HOUSING SUPPLY 
This continues to be a very challenging period for the construction sector and
there is ongoing slippage in the new build programme due to disruption and
shortages with materials and staffing. The Strategic Housing Investment Plan
(SHIP) delivered 8 new affordable homes on Islay in 2021/22. There were no
SHIP developments in Mid Argyll and Kintyre in this period. 
RSL PROJECT Units Funding
West Highland Imereval Phase 3, Islay  8 £1,354,567 
Further projects in the MAKI area which are either already onsite or in early
stages of development for future programming in the SHIP include: 
ACHA Tarbert Phase 2 (4 units – January 2023);
Milknowe, Kintyre (1 / 2 dementia units –Oct 2022)
Inveraray (10 units – April 2022); 
Bowmore Phase 4 (18 units –2023); 
In addition, the following potential sites are under consideration
for future development:
Keills, Islay (4 units); 
Dalintober, Campbeltown, Kintyre
Port Ellen, Islay
Skipness/Carradale, Kintyre
Glenegadale, Islay
WHHA Colonsay (5 units)
Creamery, Port Charlotte(8 units); 
Imereval Phase 4 (20 units)
FYNE
HOMES
Inveraray (16 units – 2023) 
Page 54

Page 55

4.5 EMPTY HOMES 
In 2021/22 there were 6 private empty homes brought back into use in MAKI, 
amounting to 16% all the empty homes brought back into use across Argyll and
Bute last year with assistance of the Empty Homes Officer (38). 
Council Tax Information on Empty Homes
The following table breaks down the numbers of empty homes including those
subject to premium Council Tax charge across the MAKI area.  The table does
not include properties which are empty and exempt from Council Tax. The
numbers of recorded empty homes can vary from day to day due to natural
changes and reported numbers are snapshot from monthly reports. 
MAKI 
Council tax data as at 01.11.22
Number of
properties on
Council Tax
register
Empty
Homes
Properties
subject to
200% council
tax levy
Total 
EMPTY
Islay, Jura & Colonsay 2,232 20 54 74
Mid Argyll 5,779 73 88 161
Kintyre (including Gigha)  4,221 54 87 141
MAKI TOTAL 12,232 147 229 376 
Council Tax Exemptions
There are also a number of empty properties which are on the Council Tax
register which are exempt from paying council tax.  In MAKI there are 321
properties which are empty and exempt from Council Tax. The categories for
empty properties include: 
 Class 4A = Properties recently occupied but now empty and unfurnished(182)
 Class 7A = Dwellings Empty Under Statute – Closing or Demolition Order (43)
 Class 6A = Deceased owners – where estate has not been settled (65)
 Class 8A= Held for demolition (7)
 Class 5A= Living/detained elsewhere (16)
 Class 19A= Difficult to let separately (1)
 Class 2A= Unoccupied- Renovation (7) 
Second Homes
As at 1st November 2022 there were 250 registered Second Homes on Islay,
Colonsay and Jura, 201 in Kintyre and 403 registered Second Homes in Mid
Argyll. The total figure for MAKI 854 represents 30% of the total number of
Second Homes in Argyll and Bute (2815). 
Page 55

Page 56

Self-Catering Lets
As at 3rd November 2022 there were 678 self-catering lets on the Rates
register in the MAKI area.  29% of the Argyll and Bute total (2321). 
4.6 PRIVATE SECTOR HOUSING GRANT – ADAPTATIONS 
In 2021/22, there were 30 private sector properties adapted with PSHG aid in 
MAKI, and a total of 41 individual adaptations installed. 
4.7 PRIVATE SECTOR HOUSING GRANT – REPAIRS AND IMPROVEMENTS
In 2021/20, there were a total of 3 PSHG repair and improvement grants
completed in MAKI, (across Argyll and Bute, the total was 19). Total cost of
the works was £4,853.00 of which PSHG covered £4,248.00. This was 9% of
the total repair grant awarded for Argyll & Bute last year. 
4.8 ENERGY EFFICIENCY (HOME ENERGY EFFICIENCY PROGRAMME:
AREA BASED SCHEME HEEPS:ABS) 
There were 252 individual energy efficiency measures installed across Argyll
and Bute in 2020/21 via the HEEPS:ABS programme and 200 households
improved in total. In total almost half (49%) of these measures (123) were
installed in MAKI. 
In total, 103 properties were improved across the MAKI area, at a total cost of
MAKI 
Rates data as at 03.11.22
Number of self-catering
properties
Islay, Jura & Colonsay 276
Mid Argyll 275
Kintyre (including Gigha)  127
MAKI TOTAL 678
PSHG ADAPTATION COMPLETIONS 2021 -2022
HMA Grant Value Works Value ADAPTATION INSTALLED      
Ramp Stairlift Access Bathroom
Adaptation
Autism
Adaptation
Wash and
Dry Unit
Kintyre  £ 116,728.12   £ 134,677.16  1 1 1 14 1 1
Mid
Argyll  £   42,677.06   £   52,190.82  0 1 1 6 0 0
Islay,
Jura &
Colonsay 
£   21,055.88   £   24,539.40  0 3 3 8 0 0
TOTALS  £ 180,461.06   £ 211,407.38  1 5 5 28 1 1
Page 56

Page 57

£714,294. Grant aid in support of this work amounted to £668,100. 
Current estimates of Fuel Poverty are based on Home Analytics data
(Scottish figure sourced from Scottish House Condition Survey):- 
Area Likelihood of Households in 
Fuel Poverty Extreme Fuel Poverty
Islay, Jura and Colonsay 36% 43%
Kintyre 31% 25%
Mid Argyll 28% 28%
Argyll and Bute 30% 25%
Scotland (SHCS Figure) 25% 12% 
4.9 LOCAL HOUSING STRATEGY (LHS) 2022-2027 
As the strategic housing authority for Argyll and Bute, the Council has a
statutory duty to develop, implement and monitor a Local Housing Strategy over
a five-year planning cycle, based on a robust and credible Housing Need and
Demand Assessment (HNDA) for the area.  Following completion of the
previous Argyll and Bute LHS  (2016-2021) last year, a comprehensive revision
and update of the strategy has been approved by the council and was formally
launched in April 2022. The planning process was based on a robust process
of consultation and stakeholder engagement, which has been acknowledged
as an exemplar model for other local authorities by the Scottish Government,
the CHMA, and the Scottish Housing Network LHS Forum.   
The revised HNDA was approved as “robust and credible” by the Scottish
Government’s CHMA in 2021, and this has informed the revised Housing
Supply Targets set out in the new LHS. These targets are based on a positive
demographic and economic growth scenario for Argyll & Bute and include
ambitious and challenging Housing Supply Targets for the Mid Argyll, Kintyre,
and Islay, Jura & Colonsay HMAs over the next 5 years and beyond. 
5.0 CONCLUSION
5.1 This report provides the detail of the Council Housing Services team activity in 
the Mid Argyll, Kintyre and Islands area and an overview of the progress achieved
with the Local Housing Strategy Action Plan. There are a variety of housing issues
within the area which are being tackled by Housing Services and partner agencies
with the aim of delivering a functioning housing system which meets  the needs
of the communities we serve. 
6.0 IMPLICATIONS
6.1 Policy - Complies with approved SHIP and Local Housing Strategy.
6.2 Financial - none arising from this report.
6.3  Legal - we have a statutory duty to deliver statutory housing functions.
Page 57

Page 58

6.4  HR – none.
6.5  Fairer Scotland Duty: positive in terms of delivering affordable housing. 
6.5.1  Equalities - protected characteristics – none. 
6.5.2  Socio-economic Duty - positive in terms of delivering affordable housing. 
6.5.3  Islands – positive in terms of delivering affordable housing on the islands.
6.6 Climate Change – the strategy and housing service deliver positive impacts for
energy efficiency and climate change.
6.7 Risk – none.
6.8  Customer Service – none. 
Kirsty Flanagan, Executive Director with the responsibility for Development and
Economic Growth 
Councillor Robin Currie, Policy Lead for Strategic Development 
January 2023 
For further information contact: 
Douglas Whyte
Team Lead – Housing Strategy 
E-mail: douglas.whyte@argyll-bute.gov.uk
Tel: 01546 604 785 
APPENDICES  
Appendix 1 – Extract from LHS 2022- 2027 (data as of 2020) Islay, Jura & Colonsay
Appendix 2 – Extract from LHS 2022 - 2027 (data as of 2020) Kintyre
Appendix 3 – Extract from LHS 2022 - 2027 (data as of 2020) Mid Argyll 
Page 58

Page 59

Appendix 1 – Extract from LHS 2022 - 2027 (data as of 2020)                                                  
Islay, Jura & Colonsay 
ISLAY, JURA & COLONSAY HMA combines the three distinct islands for strategic
planning purposes. The overall population is estimated to have declined by 3% over
the last five years, although individual island trends have varied. The combined total
number of households for the three islands conversely appears to have increased by
almost 6% suggesting increasing numbers of smaller and single-person households.
The islands are not particularly self-contained housing markets with less than half
(49%) of house sales going to local purchasers; and 2.4% of purchasers originating
elsewhere in the authority area. Affordability is a major issue, with one of the highest
price-to-income ratios in Argyll and Bute, at 9.0, and well above the standard
affordability threshold. Since 2015 there has been an increase in the total number of
dwellings (over 3% growth), particularly with a number of new build developments
recently and ongoing on islay; but also small-scale pipeline proposals for Colonsay
and Jura. Currently the islands account for 5% of the total stock in the authority.
However, 16% of the stock comprises second/holiday homes or long-term vacant
properties and is consequently unavailable to meet local need. In 2020 there were
around 505 social rented homes across the islands which is an increase of over 14%
in the sector during the last 5 years. Numerically, waiting lists may be small however
turnover in the stock is also limited, therefore the pressure ratio is currently one of the
highest in Argyll & Bute, with 7 applicants for every available let. 
Key issues for Islay, Jura & Colonsay HMA: 
 Further developments of affordable housing will benefit the sustainability
and economic growth of the island communities.
 Tackling fuel poverty and improving energy efficiency are priorities.
 Ensuring appropriate specialist provision is available to meet the
requirements of those with particular needs will also be important. 
Population                                     
Households                                   
Dwellings                                       
Ineffective Stock (%)  
RSL Stock  
Waiting List Applicants  
RSL Lets (2019/20) 
Pressure Ratio  
Lower Quartile House Price 
Lower Quartile Income  
LQ Affordability Ratio   
3,344
1,740
2,180
16%
505
186
27
7:1
£136,500
£15,208
9.0 
Islay, Jura & Colonsay
Page 59

Page 60

Appendix 2 – Extract from LHS 2022 - 2027 (data as of 2020) Kintyre 
KINTYRE HMA covers the Kintyre peninsula south of Tarbert and for planning
purposes also incorporates the Isle of Gigha. It is actually the second most contained
Housing Market within the authority; 64% of all house sales are to local residents
and less than 15% of sales are to purchasers from elsewhere in Scotland, the lowest
rate of any HMA. Although local household incomes are amongst the lowest in the
authority area, so too are average house prices and consequently, while a proportion
of local residents are unable to afford on the open market, the affordability ratio is
less excessive than many other areas. Kintyre accounts for 9% of the total dwelling
stock in the authority, and there was an overall increase in the stock of 8% over the
last five years, after a period of relative stagnation previously. The area also has a
relatively low level of ineffective stock, though at 11% of the total this is still well
above national levels. In 2020, there were 1,084 RSL homes in this area accounting
for around 13% of Argyll & Bute’s total stock of social rented housing. Turnover is
fairly healthy relative to the waiting list, and supply and demand therefore are
reasonably balanced, however further development in this area would support
regenaration and positive economic growth. 
Key issues for Kintyre HMA: 
 The focus in this area remains on repairing, maintaining, improving and
managing existing stock; but there is scope for some judicious new build
developments in line with the repopulation and growth agendas for the area. 
 Tackling fuel poverty and improving energy efficiency remain priorities.
 The provision of Housing Options advice and information; Tenancy Support;
and ensuring that sufficient specialist provision remains available to meet the
requirements of those with particular needs will also be important. 
Kintyre
Population
Households
Dwellings
Ineffective Stock (%)
RSL Stock
Waiting List Applicants
RSL Lets (2019/20)
Pressure Ratio
Lower Quartile House Price
Lower Quartile Income
LQ Affordability Ratio
7,339
3,823
4,171
11%
1,084
121
86
1:1
£56,938
£12,449
4.6 
Page 60

Page 61

Appendix 3 – Extract from LHS 2022 - 2027 (data as of 2020) Mid Argyll 
MID ARGYLL HMA stretches from Inveraray to Lochgilphead and Tarbert and is the
centre for much of the public sector employment opportunities in the authority,
including Council headquarters. Only 54% of house sales in the area are to local
residents (a significant drop in self-containment since the previous HNDA), but almost
9% were to purchasers from elsehwere in Argyll & Bute, one of the highest rates of
internal movement within the authority. 20% of purchasers come from elsewhere in
Scotland and over 16% originate elsewhere in the UK.  This area tends to have higher
than average income levels and consequently the price-to-income affordability ratio is
slightly lower than most other HMAs. The total number of dwellings has increased by
2.4% between 2015 and 2020. Currently the area accounts for over 12% of the
authority total. However, around 13% of the stock comprises second/holiday homes
and long-term vacant properties and is therefore unavailable to meet local needs. In
2020 there were 1,033 RSL homes in the area,  12% of the sector total for Argyll &
Bute. While turnover is relatively healthy in the RSL stock, around 9% of the total
waiting list is seeking to be rehoused here and over14% of homelessness is located
in this HMA. However, HNDA analysis suggested that less than 7% of backlog need
is located in Mid Argyll. 
MID ARGYLL                     
Population                                           9,123                          
Households                                         4,614                                 
Dwellings                                             5,659                                     
Ineffective Stock (%)                           13%
RSL Stock                                           1,033
Waiting List Applicants                        221
RSL Lets (2019/20)                             110
Pressure Ratio                                     2:1
Lower Quartile House Price                 £85,000
Lower Quartile Income                         £16,507
LQ Affordability Ratio                            5:1 
Key issues for Mid Argyll HMA: 
 A strategic programme of new build affordable housing will help to sustain
economic growth and address unmet need in the area.
 The provision of Housing Options advice and information; targeted Tenancy
Support; and assistance to tackle fuel poverty and improve energy efficiency; 
and ensuring sufficient specialist provision is available to meet the
requirements of those with particular needs will also remain key targets. 
Page 61

Page 62

This page is intentionally left blank

Page 63

ARGYLL AND BUTE COUNCIL  Mid Argyll, Kintyre and the Islands
Area Committee 
Legal and Regulatory Support  1 March 2023 
Area Committee appointment to Islay and Jura Community Enterprises Ltd 
1.0 EXECUTIVE SUMMARY 
1.1 The Area Committee made appointments to various outside bodies and
organisations at the meeting held on 8 June 2022.  At that time the three Ward
2 Councillors were appointed to Islay and Jura Community Enterprises Ltd. 
Following the By-Election in September 2022, Councillor Redman was
appointed to the organisation. 
1.2 Correspondence has now been received from Islay and Jura Community
Enterprises Ltd advising that on checking their constitution the organisation is
only permitted to have one appointed director from Argyll and Bute Council. 
The Area Committee is asked to nominate one Councillor representing Ward
2 to sit on the Board of the company. 
Page 63 Agenda Item 12

Page 64

ARGYLL AND BUTE COUNCIL  Mid Argyll, Kintyre and the Islands
Area Committee 
Legal and Regulatory Support  1 March 2023 
Area Committee appointment to Islay and Jura Community Enterprises Ltd 
2.0 INTRODUCTION 
2.1 The Area Committee made appointments to various outside bodies and
organisations at the meeting held on 8 June 2022.  At that time the three
Ward 2 Councillors were appointed to islay and Jura Community Enterprises
Ltd.  Following the By-Election in September 2022, Councillor Redman was
appointed to the organisation. 
3.0 RECOMMENDATIONS 
3.1 The Area Committee is asked to nominate one Ward 2 Councillor to be the
Council representative on the Board of Islay and Jura Community Enterprises
Ltd. 
4.0 DETAIL 
4.1 Correspondence has been received from Islay and Jura Community Enterprises
Ltd advising that on checking their constitution the organisation is only permitted
to have one appointed director from Argyll and Bute Council.  The Area
Committee is asked to nominate one Councillor representing Ward 2 to sit on
the Board of the company. 
4.2 Further to the letter attached as Appendix 1, the organisation have confirmed
that they would welcome an appointment which will last until the next Local
Government Elections scheduled for May 2027. 
5.0 CONCLUSION 
5.1 This report advises the Area Committee of the current situation in regard to Islay
and Jura Community Enterprises Ltd and asks Members to consider nominating
one Ward 2 Councillor to be the Council representative on their Board. 
6.0 IMPLICATIONS 
6.1 Policy – none 
6.2 Financial – there will be costs incurred in terms of Members attending
these meetings. 
6.3 Legal – none
Page 64

Page 65

6.4 HR – none 
6.5 Fairer Scotland Duty – none 
6.5.1 Equalities – protect characteristics – none 
6.5.2 Socio-economic Duty – none 
6.5.3 Islands – none 
6.6 Climate Change – none 
6.7 Risk – none 
6.8 Customer Service – none 
Douglas Hendry 
Executive Director with responsibility for Legal and Regulatory Support 
Councillor Alastair Redman, Policy Lead for Economic Growth, Communities
and Corporate Services 
31 January 2023                                                  
For further information contact: Shona Barton, Governance Manager    
Tel: (01436) 657605 
APPENDICES 
Appendix 1 – Letter from Islay and Jura Community Enterprises Ltd. 
Page 65

Page 66

This page is intentionally left blank

Page 67

Page 67

Page 68

This page is intentionally left blank

Page 69

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
1st March 2023
1st March
2023
Learning
Journey’s –
Pupils
Representative
Discussion
Simon Easton to facilitate One-off  
1st March
2023
Transport
Scotland Update
Neil MacFarlane
Transport Scotland 
Annual Report  
1st March
2023
Scottish Water
Update
Georgie Reid
Scottish Water 
Annual Report  
1st March
2023
Quarterly
Performance
Scorecard FQ3
22/23
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
1st March
2023
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
1st March
2023
Cemetery
Provision and
Maintenance
Jim Smith One-off  
1st March
2023
Strategic Housing
investment plan
(SHIP)
Douglas Whyte
Development and Economic
Growth
Annual Report  
1st March
2023
Area Committee
Appointment to
Islay and Jura
Shona Barton One-off  
Page 69
Agenda Item
13

Page 70

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
Community
Enterprises Ltd
1st March
2023
Area Committee
Workplan
Shona Barton For updating  
June 2023
June 2023 Islay High School
Report
Stephen Harrison
Head Teacher 
Annual Report  
June 2023 Tarbert Academy
Report
Neil McKnight
Head Teacher 
Annual Report  
June
2023
Campbeltown
Grammar School
Report
X
Acting Head Teacher
Annual Report  
June 2023 Lochgilphead
High School
Report
Jay Helbert
Head Teacher
Annual Report  
June 2023 Attainment
Picture
Jen Crockett/Simon Easton One off Report  
June 2023 Supporting
Communities
Fund – End of
Project
Monitoring 21/22
Rona Gold/Antonia Baird
Chief Executive
Regular Report  
June 2023 Patient Transport
Policy
Health and Social Care
Partnership
One off Report  Update on new
policy following
completion of
review
Page 70

Page 71

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
June 2023 Flooding Issues
in MAKI
Roads and Infrastructure Services
Jim Smith 
Ongoing  Update to be
provided to
Members
following EDI
Committee on
3rd March
2022. 
June 2023 Tarbert and
Lochgilphead
Regeneration
Fund
Audrey Martin
Development and Economic
Growth
Regular Updates  
June 2023 MAKI
Accessibility and
Footway Survey
TBC TBC  
June 2023 Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
June 2023 Quarterly
Performance
Scorecard FQ4
22/23
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
June 2023 HSCP Bi-Annual
Update Report
Charlotte Craig/Fiona Davies
Argyll and Bute Health and Social
Care Partnership
Bi-Annual Report  
June 2023 Area Committee
Workplan
Shona Barton For updating  
Page 71

Page 72

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
June 2023 Supporting
Communities
Fund Applications 
David Hagerty/Becky Hothersall
Chief Executive
Annual Report  Usually goes in
March but for
2023 only it will
not be presented
until June round
of meetings.
September 2023
September
2023
Annual Recycling
Performance
Report
Jim Smith
Roads and Infrastructure Services
Annual Report  
September
2023
Quarterly
Performance
Scorecard FQ1
23/24
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
September
2023
Area Committee
Workplan
Shona Barton For updating  
December 2023
December
2023
Quarterly
Performance
Scorecard FQ2
21/22 
Performance
Report
Presentation
Jane Fowler/Sonya Thomas
Performance and Improvement 
Stuart Green
Quarterly Report  
December
2023
HSCP Bi-Annual
Update Report
Charlotte Craig/Fiona Davies
Argyll and Bute Health and Social
Care Partnership
Bi-Annual Report  
Page 72

Page 73

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
December
2023
ACHA Annual
Update
Chief Executive ACHA Annual Report  
December
2023
Charities and
Trust Funds
Shona Barton
Legal and Regulatory Support 
Annual Report  
December
2023
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
December
2023
Local Housing
Strategy Annual
Update
Douglas Whyte, Strategic Housing  Annual Report  
December
2023
Area Committee
Workplan
Shona Barton For updating  
Future Items             
Page 73

Page 74

This page is intentionally left blank