Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
31 May 2023 
NOTICE OF MEETING 
A meeting of the MID ARGYLL, KINTYRE & THE ISLANDS AREA COMMITTEE will be held ON
A HYBRID BASIS BY MICROSOFT TEAMS AND IN THE COUNCIL CHAMBERS, KILMORY,
LOCHGILPHEAD on WEDNESDAY, 7 JUNE 2023 at 10:00 AM, which you are requested to
attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTE OF THE MID ARGYLL, KINTYRE AND THE ISLANDS AREA
COMMITTEE HELD ON 1 MARCH 2023 (Pages 3 - 8) 
4. PUBLIC QUESTION TIME 
5. CAMPBELTOWN GRAMMAR SCHOOL ATTAINMENT REPORT (Pages 9 - 24)  
Report by Executive Director with responsibility for Education 
6. ISLAY HIGH SCHOOL ATTAINMENT REPORT (Pages 25 - 40)  
Report by Executive Director with responsibility for Education 
7. LOCHGILPHEAD HIGH SCHOOL ATTAINMENT REPORT (Pages 41 - 58)  
Report by Executive Director with responsibility for Education 
8. TARBERT ACADEMY ATTAINMENT REPORT (Pages 59 - 72)  
Report by Executive Director with responsibility for Education 
9. PRIMARY AREA ATTAINMENT REPORT:  MID ARGYLL, KINTYRE AND THE
ISLANDS (MAKI) (Pages 73 - 90)  
Report by Executive Director with responsibility for Education 
10. AREA PERFORMANCE REPORT - FQ4 2022/23 (Pages 91 - 124)  
Report by Executive Director with responsibility for Customer Support Services
Public Document Pack

Page 2

11. CEMETERY PROVISION AND MAINTENANCE (Pages 125 - 128)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
12. ROADS AND INFRASTRUCTURE SERVICES UPDATE (Pages 129 - 132)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
13. SUPPORTING COMMUNITIES FUND 2023/24 (Pages 133 - 152)  
Report by Executive Director with responsibility for Community Development 
14. HSCP ANNUAL PERFORMANCE REPORT 2022-2023 (Pages 153 - 194)  
Report by Chief Officer, Argyll and Bute HSCP 
15. TARBERT AND LOCHGILPHEAD REGENERATION FUND - PROJECTS UPDATE
(Pages 195 - 204)  
Report by Executive Director with responsibility for Economic Growth 
16. MID ARGYLL, KINTYRE AND THE ISLANDS AREA COMMITTEE WORKPLAN
(Pages 205 - 210) 
REPORT FOR NOTING 
17. WHITE HART HOTEL: DANGEROUS BUILDING (Pages 211 - 214)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Mid Argyll, Kintyre & the Islands Area Committee 
Councillor John Armour Councillor Jan Brown
Councillor Garret Corner (Chair) Councillor Robin Currie (Vice-Chair)
Councillor Donald Kelly Councillor Tommy MacPherson
Councillor Dougie McFadzean Councillor Dougie Philand
Councillor Alastair Redman   
Shona Barton, Governance Manager 
Contact: Lynsey Innis, Senior Committee Assistant - 01546 604338

Page 3

MINUTES of MEETING of MID ARGYLL, KINTYRE & THE ISLANDS AREA COMMITTEE held ON
A HYBRID BASIS BY MICROSOFT TEAMS AND IN THE COUNCIL CHAMBERS, KILMORY,
LOCHGILPHEAD 
on WEDNESDAY, 1 MARCH 2023 
Present: Councillor Garret Corner (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Robin Currie (Teams)
Councillor Donald Kelly 
Councillor Dougie McFadzean
Councillor Douglas Philand
Councillor Alastair Redman 
Attending: Jim Smith, Head of Roads and Infrastructure Services
Shona Barton, Governance Manager
Tom Murphy, Operations Manager
Simon Easton, Education Manager
Sonya Thomas, Performance and Improvement Officer
Douglas Whyte, Team Leader
Neil MacFarlane, North West Area Manager, Transport Scotland
Georgie Reid, Regional Communities Manager, Scottish Water
Neil McKnight, Head Teacher, Tarbert Academy
Milo Ingram, Tarbert Academy
David Mitchell, Head Teacher, Campbeltown Grammar School
Ciara Wallace, Campbeltown Grammar School
Aimee MacPhail, Campbeltown Grammar School 
1. APOLOGIES FOR ABSENCE 
The Chair welcomed everyone to the meeting. 
There were no apologies for absence intimated.   
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated.   
3. MINUTE OF THE MID ARGYLL, KINTYRE AND THE ISLANDS AREA
COMMITTEE HELD ON 7 DECEMBER 2022 
The Minute of the meeting of the Mid Argyll, Kintyre and the Islands Area Committee, held
on 7 December 2022, was approved as a correct record.   
4. PUBLIC QUESTION TIME 
There were no public questions submitted.   
5. PUPIL VOICE 
The Committee gave consideration to a verbal update from pupils at Campbeltown
Grammar School and Tarbert Academy who outlined aspects of their learning journeys
over the years.  
Page 3 Agenda Item 3

Page 4

Ciara Wallace, an S3 pupil from Campbeltown Grammar School spoke of her experience
on a recent residential trip to Loch Eil in Fort William where the aim was to develop
leadership and resilience skills. 
Aimee MacPhail, an S5 pupil at Campbeltown Grammar School spoke of her experience
and learning journey that has led to her chosen career path.   
Milo Ingram, the S6 school captain from Tarbert Academy outlined the vision and values
of the Academy and spoke of his experience as a pupil and of how it has given him the
confidence to continue into further education, having successfully obtained a place on a
course at Stirling University.   
Discussion was had on the challenges faced by pupils during the Covid-19 pandemic, with
the pupils outlining measures put in place to assist their studies, such as Google
Classroom.  Members noted that some measures are still utilised to enhance the learning
experience of pupils, such as online learning and independent study with resources
provided by the school, particularly in situations where it is not possible to offer a teacher-
led classroom for certain subjects.   
On behalf of the Committee, the Chair took the opportunity to thank the pupils for taking
time out of their day to attend and wished them well in their future endeavours.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee agreed to note the information
provided.   
Councillor Currie left the meeting during discussion of agenda item 5 (Pupil Voice).
.
6. TRANSPORT SCOTLAND - ANNUAL UPDATE 
Consideration was given to a short update from the North West Area Manager on the
current workstreams of Transport Scotland within the MAKI area.  Mr MacFarlane advised
of a number of recently completed works which included a number of resurfacing projects;
the replacement of street lighting in Inveraray and extensive sea defence surveys at Loch
Gilp, Loch Shira and the West Loch in Tarbert.  Mr MacFarlane also outlined a number of
upcoming projects including resurfacing works South of Stronachullin; the installation of a
new footway from Minard to Crarae Gardens; the pedestrian crossing and cycleway
project for Kinloch Road in Campbeltown and the resolution of the footway issue on Hall
Street, Campbeltown. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee agreed to note the information
provided. 
7. SCOTTISH WATER ANNUAL UPDATE 
Consideration was given to a short update from the Regional Communities Manager on
the current workstreams of Scottish Water within the MAKI area.  Ms Reid advised of
ongoing investment in Tayvallich, Bowmore and Clachan; the sea wall repairs in
Page 4

Page 5

Campbeltown and the Tighnabruaich Lead Replacement Project.  Ms Reid also provided
detail in respect of completed works in Tarbert, Furnace, Inveraray and Port Charlotte and
of the planned investments at a number of locations across the MAKI area.  Ms Reid
outlined the value of future investments identified and spoke of the ongoing engagement
with the developer of the new distillery application on Islay.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee agreed to note the information
provided. 
8. AREA PERFORMANCE REPORT - FQ3 2022/23 
The Committee gave consideration to the Area Performance Report for financial quarter 3
of 2022/23 (October to December 2022) which illustrated the agreed performance
measures for this period.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee:- 
1. noted and considered the performance and supporting commentary as presented; 
2. agreed that upon receipt of the Quarterly Performance Report, the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any queries; and   
3. noted that work was ongoing and to respond to Sonya Thomas with requests or
comments regarding the layout and format of the Performance Report. 
(Reference:  Report by Executive Director with responsibility for Customer Support
Services, dated 1 March 2023, submitted) 
Councillor Currie re-joined the meeting during discussion of agenda item 8 (Area
Performance Report – FQ3 2022/23).
.
9. ROADS AND INFRASTRUCTURE SERVICES UPDATE 
The Committee gave consideration to a report which provided an update on the recent
activities of Roads and Infrastructure Services and highlighted works being undertaken
which were relevant to the Mid Argyll, Kintyre and the Islands area. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee considered and noted the
contents of the report. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated 1 March 2023, submitted) 
10. CEMETERY PROVISION AND MAINTENANCE 
Page 5

Page 6

Having noted that it was agreed by the Policy and Resources Committee in October 2022,
to allocate £300,000 towards a Cemetery Maintenance and Roads Access Improvement
Fund, being £75,000 for each administrative area, the Committee gave consideration to a
report which provided options for approval that had been informed by a meeting with the
Mid Argyll, Kintyre and the Islands Members.   
Members expressed concern that the information provided in the report was not what had
been requested at previous meetings.  The Chair advised that he would ensure that a
report providing the information initially requested at the Area Committee meeting on 7
September 2022 be presented to the next Area Committee meeting, scheduled to take
place on 7 June 2023.   
Motion 
The Mid Argyll, Kintyre and the Islands Area Committee:- 
1. agree to Package B as outlined in paragraph 3.3 of the report, subject to the
replacement of option 13 from the schedule of proposed works with option 7; 
2. agree that any underspend within an area is used for further levelling up of lairs; and 
3. note that regular updates will be provided via the Roads and Infrastructure weekly
briefing. 
Moved by Councillor John Armour, seconded by Councillor Jan Brown.   
Amendment 
The Mid Argyll, Kintyre and the Islands Area Committee:- 
1. agree to Package B as outlined in paragraph 3.3 of the report; 
2. agree that any underspend within an area is used for further levelling up of lairs; and 
3. note that regular updates will be provided via the Roads and Infrastructure weekly
briefing. 
Moved by Councillor Robin Currie, seconded by Councillor Alastair Redman.   
As the meeting was being held on a hybrid basis, the vote required to be taken by calling
the Roll and Members voted as follows:- 
Motion    Amendment     
Councillor John Armour  Councillor Garret Corner 
Councillor Jan Brown   Councillor Robin Currie
Councillor Dougie McFadzean Councillor Alastair Redman 
Councillor Dougie Philand 
Page 6

Page 7

Decision 
The Motion was carried by 4 votes to 3 and the Mid Argyll, Kintyre and the Islands Area
Committee resolved accordingly. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated 1 March 2023, submitted) 
Councillor Donald Kelly left the meeting during discussion of agenda item 10 (Cemetery
Provision and Maintenance).  
.
11. HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) - ANNUAL UPDATE 
Consideration was given to a report which provided an update on Housing Services
activity and the delivery of the Local Housing Strategy within the Mid Argyll, Kintyre and
the Islands area.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee considered and noted the content
of the report. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth, dated 1 March 2023, submitted)   
12. AREA COMMITTEE APPOINTMENT TO ISLAY AND JURA COMMUNITY
ENTERPRISES LTD 
The Committee gave consideration to a report which sought the appointment of one
Councillor from Ward 2 to sit on the Board of the Islay and Jura Community Enterprise
Ltd.   
Decision 
The Area Committee agreed that Councillor Dougie McFadzean be the Council
representative on the Board of Islay and Jura Community Enterprise Ltd.   
(Reference:  Report by Executive Director with responsibility for Legal and Regulatory
Support, dated 1 March 2023, submitted) 
13. MID ARGYLL, KINTYRE AND THE ISLANDS AREA COMMITTEE WORKPLAN 
The Committee gave consideration to the Area Committee workplan for future meetings.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee considered and noted the
contents of the workplan.   
(Reference:  Area Committee Workplan, dated 1 March 2023, submitted) 
Page 7

Page 8

This page is intentionally left blank

Page 9

ARGYLL AND BUTE COUNCIL SECONDARY SCHOOL ATTAINMENT REPORT
AREA COMMITTEE 
CAMPBELTOWN GRAMMAR SCHOOL 
JUNE 2023
Page 9
Agenda Item
5

Page 10

Campbeltown Grammar School was founded in 1686. It serves the town of Campbeltown, the south Kintyre area and the
island of Gigha and has a roll of 360. The new school opened in February 2018 and is very much built for education in the
21st Century. State of the art classrooms all have Promethean Boards that teachers are using effectively to help make
their lessons engaging and motivating. The sports facilities are excellent and comprise of a large games hall, 1 smaller
gymnasium with a climbing wall and an all-weather pitch, serviced by floodlights. Campbeltown Grammar is very much a
community school, acting as a focus for many of the area’s cultural, social and sporting activities and providing logistical
and material support for many community activities. A wide range of extra-curricular activities is offered, including drama,
art, choir, cookery and homework clubs. A wide range of sports is available, including football, volleyball, badminton,
cricket and shinty. Positive relationships between staff, pupils and parents and a supportive Parent Council are particular
features of the school. 
Page 10

Page 11

S3 ACEL Attainment in Literacy and Numeracy   
School Level % Achieved
Reading Writing L&T Literacy Numeracy
Campbeltown Grammar School Third Level or better 85.0 85.0 88.3 85.0 80.0
Argyll & Bute Third Level or better 88.3 87.0 88.2 83.9 87.8
Campbeltown Grammar School  Fourth Level 36.7 38.3 36.7 31.7 55.0
Argyll & Bute Fourth Level 49.8 47.6 51.5 45.9 57.6 
S3 ACEL – Gaelic (if relevant) 
School Level
% Achieved
Gaelic
Reading
Gaelic
Writing
Gaelic
L&T   
Third Level or better na na Na   
Fourth Level na na na   
Page 11

Page 12

Evaluative Comment – Areas of Strength in BGE Attainment: 
In listening and talking we are above of the Argyll and Bute average at level 3 and working on improving this at fourth level. 
Young people achieving level 3 literacy is higher than Argyll and Bute average 
Evaluative Comment – Areas for Development in BGE Attainment: 
We have introduced more fourth level experiences into our BGE courses to raise the percentage achieving at fourth level by the end of S3. 
We are working closely with both the PT English and PT Maths to address this issue. 
Links with Cluster primary schools have been developed further 
We have appointed a teacher of BGE Literacy, Numeracy and BGE transition to help support improvement. 
Page 12

Page 13

National Qualifications – Pass rates 
NATIONAL
QUALIFICATIONS
2021-22
A-C 
Number of
Presentations 
Number 
Attaining A-C
% Attaining A-
C
Argyll and
Bute %
Attaining A-C
National %
Attaining A-C
Advanced Higher 26 20 76.92% 85.50% 82.60%
Higher 185 135 72.97% 80.90% 80.30%
National 5 323 229 70.90% 79.70% 81.60% 
Level/Stage           
2022 A B C D No Award  Grade A-B  Grade A-C  Grade A-D
National 5  (Nat. 41.20%
A&B 35.40%)
(Nat. 23.00%
A&B 25.57%)
(Nat. 17.43%
A&B 18.69%)
(Nat. 10.79%
A&B 12.73%)
(Nat. 7.60%
A&B 7.60%)
(Nat. 64.20%
A&B 61%) 
(Nat. 81.60%
A&B 79.70%)
(Nat. 92.4%
A&B 92.4%)
S4 26.98% 23.72% 20.93% 16.28% 12.09% 50.70% 71.63% 87.91%
S5 25.71% 24.29% 22.86% 17.14% 10.00% 50.00% 72.86% 90.00%
S6 21.05% 18.42% 23.68% 21.05% 15.79% 39.47% 63.16% 84.21%
Higher  (Nat. 36.50%
A&B 35.60%)
(Nat. 24.32%
A&B 24.56%)
(Nat. 19.49%
A&B 20.8%)
(Nat. 11.74%
A&B 12.61%)
(Nat. 7.90%
A&B 6.50%)
(Nat.60.90%
(A&B 60.00%)
(Nat. 80.3%
A&B 80.90%)
(Nat 92.10%
A&B 93.50%)
S4 100.00% 0.00% 0.00% 0.00% 0.00% 100.00% 100.00% 100.00%
S5 22.40% 24.00% 30.40% 16.80% 6.40% 46.40% 76.80% 93.60%
S6 13.56% 28.81% 22.03% 15.25% 20.34% 42.37% 64.41% 79.66%
Page 13

Page 14

Advanced Higher  (Nat 35.00%
A&B 30.80%)
(Nat. 26.28%
A&B 26.09%)
(Nat. 21.35%
A&B 28.99%)
(Nat. 11.27%
A&B 11.59%)
(Nat. 6.20%
A&B 3.20%)
(Nat 61.2%
A&B 56.7%)
Nat. 82.60%
A&B 85.50%)
(Nat. 93.80%
A&B 96.8%)
S5 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 100.00% 100.00%
S6 20.00% 20.00% 36.00% 20.00% 4.00% 40.00% 76.00% 96.00% 
Evaluative Comment – Areas of Strength 
Our staff have worked hard to develop a package of interventions to support our young people 
An attainment package has been introduced in the school to support staff, parents and young people. 
Evaluative Comment – Areas for Development 
Our S4 National 5 A-C pass rate is below Argyll and Bute and the National establishment 
Our S5 Higher A-C pass rate is below Argyll and Bute and the National Establishment 
Our S6 Advanced Higher A-C pass rate is below Argyll and Bute and the National Establishment 
The school must continue to further develop the attainment package introduced during session 2022-23. 
Page 14

Page 15

Insight Dashboard 
What is Insight Scotland?
Insight is a professional tool, aimed at teachers and other staff. It is used to help secondary schools and local authorities identify areas of success and where
improvements can be made for pupils in the senior phase. The dashboard has 4 measures. 
Page 15

Page 16

Improving attainment in literacy and numeracy 
Evaluative Comment – Areas of Strength 
Work has started to improve attainment in Literacy and Numeracy. 
We have appointed a Teacher of Literacy, Numeracy and BGE Transition to support this improvement 
Evaluative Comment – Areas for Development
Further work is required to improve attainment in Literacy and Numeracy at both Level 3 and Level 4. 
Page 16

Page 17

Increased post-school participation 
Evaluative Comment – Areas of Strength 
Skills are being taught in classes to help develop our young people
We have introduced more inputs on pathways when leaving school
We held a partners meetings to discuss apprenticeships and other employment routes
We have increased aspirations of our young people 
Evaluative Comment – Areas for Development 
Further work is required to improve our leavers’ destination. Our current data is below our Virtual comparator, Argyll and Bute, The Northern Alliance and the
National Establishment. 
Page 17

Page 18

Improving attainment for all 
Evaluative Comment – Areas of Strength 
Our attainment programme introduced during session 2022-23 should improve our attainment data
New tracking and monitoring system has been introduced to allow staff to track young people’s attainment and progress. 
Evaluative Comment – Areas for Development 
We have further development in all three measures. We are below our virtual comparator, Argyll and Bute, The Northern Alliance and National
Establishment. 
Further development of the attainment package that have been introduced 
Departmental reviews will be introduced during session 2023-23. This will ensure the Senior Leadership Team are aware on any subject specific
issues. 
Page 18

Page 19

Attainment versus Deprivation 
Evaluative Comment – Areas of Strength 
Young people in SIMD 2 have performed equally well as the National establishment. 
Young people in SIMD 7 have performed better than the National establishment 
Evaluative Comment – Areas for Development 
Young people in SIMD 3, 5 and 6 performed lower than the National Establishment
Continued work is required to improve attainment in these areas. 
Page 19

Page 20

Wider Achievement Qualifications 
National Certificates; Higher National Certificates; Scottish Vocational Qualifications;  National Progression Awards; Skills
for Work qualifications; Foundation Apprenticeships; Scottish Baccalaureate
Overall evaluative comment/narrative on Wider Achievement Qualifications in your school: 
Wider achievement opportunities in our school have a large uptake 
College 
A total of 80 pupils selected an additional course. 67 of those young people gained a qualification. 4 young people failed and 9
young people withdrew from their course. Some of the withdrawals came from young people who left school and others were from
young people who were not engaging in education.   
SCHOOL/COLLEGE
PARTNERSHIP
NATIONAL
QUALIFICATIONS
2021-22
A-C (including Passes) 
Number of
Presentations 
Number 
Attaining A-C % Attaining A-C
% of those
commencing
college course
completing
course
Higher 2 0 0% 
89% National 5 36 31 86%
National 4 47 41 87%
SCHOOL/COLLEGE
PARTNERSHIP
NATIONAL
QUALIFICATIONS
2021-22
A-D (including Passes) 
Number of
Presentations 
Number 
Attaining A-D % Attaining A-D
% of those
commencing
course
completing
course
Higher 2 0 0 
89% National 5 36 33 91
National 4 47 41 87
Page 20

Page 21

UNGRADED COURSES
Numbers Achieving
SCQF 4 SCQF 5 NPA Other Awards (please
detail)
ARAAS4EE1L - Early Education &
Childcare (SfW) National 4 1 Yr
(Argyll) 
9
ARAAS5EECL - Early Education &
Childcare (SfW) National 5 1 Yr
(Argyll)  
9
ARAMS4BSKL - Beauty Skills NPA
Level 4
(Argyll) 
6
ARAMS5MUSL - Make-Up Skills
NPA Level 5
(Argyll)  
4
ARCFS5ES1L - Engineering Skills
(SfW) National 5 1 Yr
(Argyll)  
11  
ARCSS5SR1L - Sport and
Recreation (SfW) National 5 1yr
(Argyll)  
7
ARDIS4RU1L - Rural Skills (SfW)
National 4 1 Yr
(Argyll) 
7
ARDOS4PCOL - National 4
Hospitality: Practical Cookery
(Argyll) 
8
ARBLS6CGDL - Computer Games
Development NPA at SCQF Level 6
(Argyll)    
0
ARBOS6SS2L - FA Social Services
& Healthcare 2 Year
(Argyll)    
1
The college partnership is a positive one. 
Page 21

Page 22

Other wider achievement opportunities 
12x An introduction to Leadership 
12x Leadership in Practice
Health and Social Care Yass course x3 
Future Learn course in Forensic Science, Beginners German and Sociology
Sports Leaders Award x 30
2 Holocaust Ambassadors 
6 Springbank internship 
Personal safety delivered to S5 
Asdan and John Muir delivered to S3 
Equity and Attainment – Evaluation of Key Factors 
Factor in attainment 
Attendance School Ave. Att. 21-22:  87.41%
Exclusion No. of Exclusion Incidents 21-22:  8 
No. of Exclusion Openings 21-22:  19
Additional
Support Needs
New Principal Teacher of Learning and Behaviour support appointed. 
Increased access to mainstream classes with provision of National 1
and 2 courses in some subjects. 
SIMD
Staff made aware of SIMD profile and how to support young people
Free School
Meal
Entitlement
Breakfast club is available to all young people
Pupils can attend a soft start with HWB officer where breakfast club is
also provided.
Care
Experienced
(and previously
Care
Experienced) 
English as
Additional
Language 
Page 22

Page 23

Other (give
details 
Pupil Equity Funding 
We have used our Pupil Equity Funding to appoint a wellbeing officer to support our young people. 
We have introduced a wellbeing room for our young people. This is used as a “soft start” for our young people and to support their learning.
Additional inputs are now delivered in the wellbeing room for targeted young people.   
Other information 
Campbeltown Grammar School has made positive strides forward during session 2022-23. The ethos in the school is positive and our young
people are motivated. 
We have introduced a number of new initiatives to support our young people. Our attainment package and mentoring programme has
improved motivation in our senior pupils. 
The Campbeltown Brass Band continues to perform well. Many of our young people play with the band. They were named as the Scottish and
British champions. 
Our young people have performed well in swimming, A number of young people made the national finals and just missed out on winning a
medal. 
Our Art and Design department came third in a National Global Canvas Challenge. They create a giant collage around the theme of
biodiversity. The produced a collage of a Blue Whale. 
We have further developed our YPI programme and two of our young people will attend the National YPI conference in Perth 
Page 23

Page 24

Page 24

Page 25

ARGYLL AND BUTE COUNCIL SECONDARY SCHOOL ATTAINMENT REPORT
AREA COMMITTEE 
NAME OF SCHOOL
Islay High School 
DATE OF REPORT 
May 2023
Page 25
Agenda Item
6

Page 26

School information/school context 
Islay High School is a non-denominational fully comprehensive secondary school with a roll of 200 and part of a cluster that includes five
primary schools; four on Islay (Bowmore, Port Ellen, Port Charlotte and Keills) and one on Jura (Small Isles).  The catchment area covers both
islands of Islay (population about 3,000) and Jura (population about 200) and is rural, remote and isolated. The students from Jura commute to
the school on a daily basis. Agriculture, distilleries and tourism are the main industries on the islands. 
The school’s curriculum model has S1 and S2 separately timetabled in the Broad General Education (BGE). S3 to S6 are all integrated in the
Senior Phase, where pupils select 5 courses per year every year from the same option choice menu.  This allows for much greater efficiency of
staffing giving pupils much great personalisation and choice. 
Due to the remoteness of the islands, the school is completely inclusive and by necessity caters for all students however complex and severe
their needs are. 
There is no Gaelic Unit in the school but Gaelic / Gaidhlig is taught for learner and native speakers to Higher level and even Advanced Higher
level if requested. 
SIMD data shows that the catchment population fits into bands 4 and 6 but this does not accurately reflect a much wider range in poverty and
affluence.  SIMD is primarily based on post codes and, on the islands, these are a very poor indicator of poverty.  10% of the pupils received
free school meals but we believe there are significantly more families eligible to apply for this but don’t do so. 
The school was awarded £9,800 in Pupil Equity Funding in session 2022/23.  This money was used to employ a teacher for 0.2 FTE to work
with vulnerable children to help them access the curriculum, to develop their self-esteem and confidence, and to support school attendance. 
The school has a high percentage of pupils with a diagnosed ASN (48% of the school roll) and 43 pupils (23%) of the school roll have child
plans. 
Finally the school was inspected in January of this year with the following outcome:
Quality Indicator 1.3 (Leadership of change):  Satisfactory
Quality indicator 2.3 (Learning, teaching and assessment): Satisfactory
Quality Indicator 3.1 (Ensuring wellbeing, equality and inclusion): Good
Quality indicator 3.2 (Raising attainment and achievement):  Good 
The full report can be accessed here . 
Page 26

Page 27

S3 ACEL Attainment in Literacy and Numeracy   
School/Authority Level % Achieved
Reading Writing L&T Literacy Numeracy
Islay High School Third Level or better 97 100 97  89
Argyll & Bute Third Level or better 88.3 87.0 88.2 83.9 87.8
Islay High School Fourth Level 43 49 43  51
Argyll & Bute Fourth Level 49.8 47.6 51.5 45.9 57.6 
Evaluative Comment – Areas of Strength in BGE Attainment:
For third level and better, Islay High School’s results are significantly and consistently above the Argyll and Bute average.  
For fourth level, the results are based on what pupils are achieving in National 4 and 5 courses in S3.  This is different to other schools, where their S3 pupils
are still in the BGE.  We do not automatically assign pupils a level 4, if they have achieved National 4 - doing so would improve the results significantly. Only
pupils, who have passed the National 4 with confidence, are assigned a Level 4.  This practice is subjective and makes it very difficult to then make
comparisons with the Argyll and Bute data.
Evaluative Comment – Areas for Development in BGE Attainment:
Continue to use PEF funding to address attainment gap, with particular focus on Literacy and Numeracy.  Continue to work on improving attendance as this
has a direct correlation to attainment.  Islay High School, like all schools, has seen a noticeable decline in attendance following the Covid pandemic. 
Page 27

Page 28

National Qualifications – Pass rates 
NATIONAL
QUALIFICATIONS
2021-22
A-C 
Number of
Presentations 
Number 
Attaining A-C
% Attaining
A-C
Argyll and Bute %
Attaining A-C
National % Attaining
A-C
Advanced Higher 19 18 95% 85.50% 82.60%
Higher 95 81 85% 80.90% 80.30%
National 5 184 160 86% 79.70% 81.60% 
Level/Stage           
2022 A B C D No Award  Grade A-B  Grade A-C  Grade A-D
National 5
(Nat. 41.20%
A&B 35.40%)
(Nat. 23.00%
A&B 25.57%)
(Nat. 17.43%
A&B 18.69%)
(Nat. 10.79%
A&B 12.73%)
(Nat. 7.60%
A&B 7.60%)
(Nat. 64.20%
A&B 61%)
(Nat. 81.60%
A&B 79.70%)
(Nat. 92.4%
A&B 92.4%)    
S3 55.7% 15.7% 17.1% 11.4% 0.0% 71.4% 88.6% 100.0%
S4 40.7% 22.1% 24.4% 8.1% 4.7% 62.8% 87.2% 95.3%
S5 13.0% 30.4% 39.1% 17.4% 0.0% 43.5% 82.6% 100.0%
S6 60.0% 20.0% 0.0% 20.0% 0.0% 80.0% 80.0% 100.0%
All (S3-S6) 43.5% 20.7% 22.8% 10.9% 2.2% 64.1% 87.0% 97.8%
Higher
(Nat. 36.50%
A&B 35.60%)
(Nat. 24.32%
A&B 24.56%)
(Nat. 19.49%
A&B 20.8%)
(Nat. 11.74%
A&B 12.61%)
(Nat. 7.90%
A&B 6.50%)
(Nat.60.90%
(A&B 60.00%)
(Nat. 80.3%
A&B 80.90%)
(Nat 92.10%
A&B 93.50%)
S4 33.3% 33.3% 33.3% 0.0% 0.0% 66.7% 100.0% 100.0%
S5 29.2% 45.8% 10.4% 14.6% 0.0% 75.0% 85.4% 100.0%
S6 37.1% 17.1% 25.7% 11.4% 8.6% 54.3% 80.0% 91.4%
All (S4-S6) 32.6% 33.7% 18.9% 11.6% 3.2% 66.3% 85.3% 96.8%
Advanced Higher
(Nat 35.00%
A&B 30.80%)
(Nat. 26.28%
A&B 26.09%)
(Nat. 21.35%
A&B 28.99%)
(Nat. 11.27%
A&B 11.59%)
(Nat. 6.20%
A&B 3.20%)
(Nat 61.2%
A&B 56.7%)
Nat. 82.60%
A&B 85.50%)
(Nat. 93.80%
A&B 96.8%)     
S5 0.0% 100.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0%
S6 55.6% 11.1% 27.8% 0.0% 5.6% 66.7% 94.4% 94.4%
All (S5 & S6) 52.6% 15.8% 26.3% 0.0% 5.3% 68.4% 94.7% 94.7% 
Page 28

Page 29

Evaluative Comment – Areas of Strength
The pass rates at N5, Higher and Advanced Higher are all significantly above the Argyll and Bute and National averages.  
Advanced Higher results are particularly pleasing given that only two periods per week are allocated to AH courses (tutorials rather than typical lessons) with a
high expectation of independent learning.   
A and B grades - % pass rates at all levels of A and B grades is high (64% at N5, 66% at Higher and 68% at AH).
Performance of S3 pupils at N5 - 100% pass rate at A-D grades with high number of A and B grades (71%) with only a small number of D awards (11.4% - 8)
and zero no awards.
Performance of S4 pupils at Higher - 100% pass rate at A-C grades (no D or no awards) and also a high percentage of A and B grades (67%).
Presentation policy - personalisation and choice is an important and key principle with our curriculum structure and that follows on to our presentation policy. 
At the same time, if a pupil is clearly failing in a course we will recommend that they take a lower ability qualification. The low number of D and no awards
would suggest that the balance is about right.  
Evaluative Comment – Areas for Development 
Continue our work with all teachers on ensuring teaching and learning is of the highest standards. 
Page 29

Page 30

Insight Dashboard 
What is Insight Scotland?
Insight is a professional tool, aimed at teachers and other staff. It is used to help secondary schools and local authorities identify areas of success and where
improvements can be made for pupils in the senior phase. The dashboard has 4 measures. 
Page 30

Page 31

Improving attainment in literacy and numeracy 
Attainment by S3 pupils is not present in Insight.  Since the vast majority of our S3 pupils achieve N4 or N5 in English and Maths, as well as
numeracy units, the data in Insight regarding attainment in Literacy and Numeracy is very misleading and shows attainment in these fields to be
far worse than it actually is.   
This implies that our leavers have significantly lower attainment in Literacy and Numeracy than our virtual comparator both at SCQF 4 and 5.  It
also implies that the attainment is actually getting worse over the three years.   
In actual fact, when S3 data is included, the school matches up well with the virtual comparator and often exceeds it. It is also worth noting that
the better pupils do in S3, the worse the Insight data looks.  So, if anything the above graph is indicating that our S3 pupils are achieving more in
terms of Literacy and Numeracy over the last 3 years. 
The table below shows the difference in the data, taken from 2021, when S3 data is included and when it is not. 
Page 31

Page 32

The graphs below illustrate the difference, showing the impact that the S3 data has on comparisons with the virtual comparator. 
Once the S3 data is included, the Islay High School results are above the Virtual Comparator, A&B and National data in all but S5 at level 5. 
Page 32

Page 33

In 2022, it is worth noting that the S3 year group had already achieved the following before starting in S4: 
S3 2022 Nos of N3 Nos of N4 Nos of N5 Total in cohort SCQF 4 (%) SCQF 5 (%)
Numeracy 7 14 15 36 80.6% 41.7%
Literacy 0 20 16 36 100% 44.4% 
Evaluative Comment – Areas of Strength 
Once the S3 data are included it is clear that the literacy and numeracy levels are high at both National 4 and national 5 levels for all year groups and leavers 
Evaluative Comment – Areas for Development 
We need to continue to look at Literacy and Numeracy across the curriculum.  Monitor and track in more detail where learning outcomes are being covered in
different subjects and potentially from that, where more could be done. 
Increased post-school participation - post school positive destinations
Page 33

Page 34

Evaluative Comment – Areas of Strength 
The percentage of school leavers in a positive destination compares favourably with the virtual comparator and other averages. We work closely with Skills
Development Scotland (officer works in Islay High School) to ensure that every pupil has the opportunity to go into a positive destination.  For the past 4 years
we have used the Pupil Equity Funding to improve attendance and engagement of pupils who are struggling, or have struggled, for whatever reason with
engagement with school.  This is helping the life chances of our pupils. 
Evaluative Comment – Areas for Development 
We need to continue to develop the provision of vocational education in the school.  At the moment the number of vocational courses on offer by Argyll
College is very small. This year we have worked hard with the college to increase the number and this effort needs to continue if we are going to achieve any
sort of equality for the pupils on our islands compared to those on the mainland. 
Improving attainment for all 
Page 34

Page 35

Evaluative Comment – Areas of Strength 
80% of our highest achievers (top middle 60 % and highest 20%) are significantly above all the other averages and the lowest 20% is in line with
the other averages, in terms of tariff points achieved.   
Evaluative Comment – Areas for Development 
We need to continue to look at ways pupils are able to gain accreditation, particularly with extra-curricular events.  For example, this year we are
able to offer:
 John Muir award to our S1 pupils who will be participating in the 3-day S1 Learning Adventure programme, 
 S2 pupils on the Arran outdoor adventure course will also get the opportunity to achieve a development or leadership award,  
 S5 and S6 pupils who will be mentors in the violence prevention (MVP) programme will be able to achieve a leadership award. 
Attainment versus Deprivation 
Page 35

Page 36

Evaluative Comment 
According to the SG, the pupils on Islay and Jura only come under SIMD deciles 4 and 6.  This is not an accurate reflection of the actual levels of
poverty on the islands due to the use of postcodes. As such, it is not possible to make any viable interpretation of the above graph.
However, we do know our pupils extremely well and we endeavour to meet the needs of all our pupils.
We also know that those pupils who are struggling to attend school and engage in their learning are more likely to come from poorer
backgrounds.  This is why we have assigned all our Pupil Equity funding to improve attendance and engagement. 
Wider Achievement Qualifications 
Page 36

Page 37

National Certificates; Higher National Certificates; Scottish Vocational Qualifications;  National Progression Awards;
Skills for Work qualifications; Foundation Apprenticeships; Scottish Baccalaureate 
Only one course completed last year (Higher Early Education and Child Care) - no issues with pupils dropping out - a very
successful course. 
Last year, there were no pupils who did any of the above courses, with the exception of the 6 pupils who did the Higher Childcare course in
conjunction with Argyll College (mentioned above).  In general, there are not the opportunities available to our pupils to do Foundation
Apprenticeships, HNCs and SVQs etc..  We do offer NPA’s in Business at Higher and N5 but only if pupils are struggle with SQA courses
and last year there were no pupils who needed to do that.  We also offer Scottish Baccalaureates, and have had 2 pupils in the past do this
but none last year. 
We are not able to provide nearly enough vocational courses through our partnership with Argyll College. We have purpose built
venues in school for Construction, Hairdressing, Hospitality, Cosmetology and Rural Skills but the college are not able to provide
tutors for these courses. 
This year, we delivered three courses in Child Care (Higher, N5 and Intro to Childcare) because we have an excellent tutor 
in that subject.  We are also delivering Rural Skills this year and developing a tree nursery but this has all been set up by the
school. 
Overall evaluative comment/narrative on Wider Achievement Qualifications in your school: 
Although it is disappointing that we are not able to offer more wider achievement qualifications at this stage, we do ensure that
we offer a wide rage of extra curricular experiences. 
We normally run the John Muir Award but last year there were no presentations for this.  We did, however, deliver the following:
- a two week expedition to Arctic Sweden, trekking over 100 km through the mountainous region close to the Norwegian
and Finland borders. 14 S5 and S6 pupils went on this.  
- 5-day residential experience for 18 S3 pupils at the Outward Bound Loch Eil Centre
- 3-day residential experience for S2 pupils at the Lochranza Outdoor Centre, travelling by bicycle to and from Arran
- 2-day multi-activity adventure days for all S1 and S2 pupils. 
Senior pupils regularly take on leadership roles, for example, representing the school at parents’ evenings and other events,
leading and chairing the Student Council, delivering Gaelic aspects of Assemblies, leading activities in vertical tutor groups,
organising regular fund-raising initiatives, supporting the learning of younger pupils. Within PE, they take on the role of Sports
Leaders, progressing to the National Youth Sports Ambassador programme. 
Page 37

Page 38

Young people also contribute to the life of the local community, for example through tree planting as part of the Rural Skills
Programme, the local and National Mòd, Fèis events, Islay Energy Trust initiatives, Islay Arts Association and visits to the local
residential care home to provide companionship to the residents. 
Young people engage with Film G to produce a Gaelic film for a national competition, and work with the local community in its
production. Engagement with Spòrs Gàidhlig allows young people to develop skills, their health and wellbeing and provides
opportunities to develop Gaelic language skills outwith the classroom. 
All year groups have pupil representatives on the Student Council, providing opportunities to develop leadership and
communication skills, and offering opportunities to take responsibility and contribute to school life. 
Trips and expeditions offer young people the opportunity to broaden horizons and develop skills, confidence, resilience,
leadership and teamwork.  Examples include: the S1 Learning Adventure; S2 Arran trip; S3 and S6 Loch Eil Outward Bound trips;
visits to further and higher education establishments; the Design and Music trip to Edinburgh, the Highland Show trip; biannual
expeditions abroad; other sporting and academic events. 
Assemblies offer the opportunity for regular recognition of young people’s achievements, in addition to the end-of-year
Celebration of Achievement, which will include Gaelic within the delivery. 
Equity and Attainment – Evaluation of Key Factors 
Factor in attainment based on 2021 - 22 data
Page 38

Page 39

Attendance School average attendance:   88.69%
Exclusion No. of Exclusion Incidents:  1
No. of Exclusion Openings:  2
Additional
Support Needs 51%
SIMD According to Scottish Government statistics, IHS pupils only fit into decile 4
and 6 and no others
Free School
Meal
Entitlement
8.4%
Care
Experienced
(and previously
Care
Experienced)
2.6%
English as
Additional
Language
3.1% 
Pupil Equity Funding 
In 2021-22, Islay high School was allocated £8600 Pupil Equity Funding.  This was all used to pay a teacher, one day a week to record and
monitor attendance and late comings but also actively work with pupils and families to improve pupils’ attendance, punctuality and
engagement. It was very difficult to see what impact this was having, as there was a significant decline in attendance.  This year although,
attendance and engagement has again been a major issue we have seen noticeable improvements in individuals’ attendance and late-
comings, which in turn has improved their engagement.  Again this has been through interventions employed through PEF. 
Page 39

Page 40

This page is intentionally left blank

Page 41

1 
ARGYLL AND BUTE COUNCIL SECONDARY SCHOOL ATTAINMENT REPORT
AREA COMMITTEE 
SCHOOL BADGE       
Lochgilphead Joint Campus (High School) 
Page 41
Agenda Item
7

Page 42

2 
9th May 2023 
School information/school context – include SIMD etc. 
Lochgilphead Joint Campus is a 3 - 18 school situated in Lochgilphead overlooking Loch Fyne.  There are currently 410 secondary age pupils, 194 primary
and 28 within Early Learning and Childcare.  The school has Learning Centre provision for both primary and secondary age pupils.  The current building
was opened in October 2007. 
The school serves several communities in Mid Argyll, from Cairndow in the East, Achahoish in the South and Ardfern in the North and takes secondary
school aged pupils from nine local primary schools.  The vast majority of pupils enter high school from either Lochgilphead or Ardrishaig Primary Schools. 
Fewer than 10% of our pupils reside in Quintile 1 or Quintile 5 in the Social Index of Multiple Deprivation (SIMD), around 40% of pupils reside in SIMD
Quintile 3, 20% in Quintile 2 and 30% in Quintile 4.  We know, however that these are data that need a local level of understanding as two people can
reside in the same SIMD area and have vastly different levels of deprivation. 
The overall attendance rate for the high school was 88.35% last session and there were 4 exclusions totalling 15 days. 
Like all schools, Lochgilphead Joint Campus continues to recover from the impact of COVID-19.  The current head teacher of campus took up post in
August 2022. 
After careful analysis of data from 2021/2022, a three year improvement strategy has been developed that focusses on key areas: 
- Well-being and engagement
- Relationships and positive behaviour
- Quality of teaching and learning
- Assessment and moderation
- Tracking and intervention based on robust data intelligence 
Page 42

Page 43

3 
S3 ACEL Attainment in Literacy and Numeracy   
School Level % Achieved
Reading Writing L&T Literacy Numeracy
Lochgilphead High School Third Level or better 77.8 79.2 77.8 69.4 72.2
Argyll & Bute Third Level or better 88.3 87.0 88.2 83.9 87.8
Lochgilphead High School Fourth Level 29.2 20.8 40.3 20.8 47.2
Argyll & Bute Fourth Level 49.8 47.6 51.5 45.9 57.6 
Evaluative Comment – Areas of Strength in BGE Attainment:
Most students achieve third level in either reading, writing and listening and talking by the end of the BGE.  The majority achieve third level in all aspects of
literacy and in numeracy.
Evaluative Comment – Areas for Development in BGE Attainment:
There are inconsistencies identified through tracking numeracy that demonstrate moderation work needs to be undertaken to improve accuracy and
consistency of teacher judgements in the BGE phase. This is, and will remain an aspect of school and departmental improvement focus in the coming years.
Page 43

Page 44

4 
The school has just developed a tracking policy from primary through to senior phase which will enable earlier intervention for pupils with literacy and
numeracy difficulties.  
The school has now implemented an early (S1) literacy intervention for pupils identified in primary schools as having difficulties with reading.  This Fresh start
programme will take two more years before the impact is seen at the end of BGE.  We have also introduced tutorials in numeracy and literacy for pupils who
have difficulty in these areas.
More pupils in S3 now have access to flexible learning pathways that include a focus on literacy and numeracy – this builds on the work previously undertaken
with S4-6 pupils by the Principal Teacher for enterprise and DYW.  
Page 44

Page 45

5 
National Qualifications – Pass rates 
NATIONAL
QUALIFICATIONS
2021-22
A-C 
Number of
Presentations 
Number 
Attaining A-C
% Attaining A-
C
Argyll and
Bute %
Attaining A-C
National %
Attaining A-C
Advanced Higher 29 22 75.9 85.50% 82.60%
Higher 197 162 82.2 80.90% 80.30%
National 5 440 331 76.2 79.70% 81.60% 
Level/Stage           
2022 A B C D No Award  Grade A-B  Grade A-C  Grade A-D
National 5 
(Nat. 41.20%
A&B 35.40%
LHS 34.1%)
(Nat. 23.00%
A&B 25.57%
LHS 24.1%)
(Nat. 17.43%
A&B 18.69%
LHS 17.0%)
(Nat. 10.79%
A&B 12.73%
LHS 13.6%)
(Nat. 7.60%
A&B 7.60%
LHS 10.0%)
(Nat. 64.20%
A&B 61%
LHS 58.2%) 
(Nat. 81.60%
A&B 79.70%
LHS 75.2%)
(Nat. 92.4%
A&B 92.4%
LHS 88.9%)
S4 40.1 25 14.8 10.7 9.3 65.1 79.9 90.7
S5 3.3 23.3 31.7 31.7 8.3 26.7 58.3 90.0
S6 0 7.1 14.3 14.3 35.7 7.1 21.4 35.7
Higher 
(Nat. 36.50%
A&B 35.60%
LHS 40.6%)
(Nat. 24.32%
A&B 24.56%
LHS 21.3%)
(Nat. 19.49%
A&B 20.8%
LHS 20.3%)
(Nat. 11.74%
A&B 12.61%
LHS 12.2%)
(Nat. 7.90%
A&B 6.50%
LHS 5.6%)
(Nat.60.90%
(A&B 60.00%
LHS 61.9%)
(Nat. 80.3%
A&B 80.90%
LHS 82.2%)
(Nat 92.10%
A&B 93.50%
LHS 94.4)
S4 100.0 0.0 0. 0 0.0 0.0 100.0 100.0 100.0
S5 44.5 23.3 18.5 9.6 4.1 67.8 86.3 95.9
S6 25.0 16.7 27.1 20.8 10.4 41.7 68.8 89.6
Page 45

Page 46

6 
Advanced Higher 
(Nat 35.00%
A&B 30.80%
LHS 24.1%)
(Nat. 26.28%
A&B 26.09%
LHS 24.1%)
(Nat. 21.35%
A&B 28.99% 
LHS 27.6%)
(Nat. 11.27%
A&B 11.59%
LHS 13.8%)
(Nat. 6.20% 
A&B 3.20%
LHS 10.3%)
(Nat 61.2%
A&B 56.7%
LHS 48.3%)
Nat. 82.60%
A&B 85.50%
LHS 75.9%)
(Nat. 93.80%
A&B 96.8%
LHS (89.75)
S5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
S6 24.1 24.1 27.6 13.8 10.3 48.3 75.9 89.7 
Evaluative Comment – Areas of Strength 
Pass rates at Higher (measured by % of A grades and A-C grades) were above A&B and national data.   
Evaluative Comment – Areas for Development 
The percentage of passes and high quality passes at Advanced Higher is below A&B and National data.  
The gap between LHS data and both A&B and national data at National 5 presents the biggest area of priority improvement.  The data for S4 (when the
majority of National 5 Qualifications are attempted) is comparable to overall national and Argyll data but performance of National 5 is lower.  This will be the
case in most schools, and in order to improve, we must focus on National 5 improvement for pupils in all parts of the senior phase, and not just in S5 and 6.
Given the school’s relatively small cohort size (compared to national), each pupil represents a relatively high percentage of the population.  This means that,
as well as universal improvements (e.g. improved teaching and learning, more effective tracking and moderation and more accurate predictions), interventions
targeted at individual pupils should have a noticeable impact on overall data.
Last session, there was a shift towards a more ambitious presentation policy (students who previously would have not been entered for National 5
qualifications were entered to give them a chance.  While in many subjects this led to an increased total number of passes, it also increased the number of no
awards.  
This year, we have introduced a mentoring programme for all pupils in S4 which specifically focusses on N4 and N5 attainment.  Every pupil has a teacher
mentor who regularly meets with them to discuss targets and next steps as well as advice for studying and revision.  This programme will be extended to
include S5 and S6 pupils by 2024.
We have re-drafted and shared study support advice for pupils and parents to support exam preparations and added to the site of additional study support
classes (live and online). 
Page 46

Page 47

7 
Insight Dashboard 
What is Insight Scotland?
Insight is a professional tool, aimed at teachers and other staff. It is used to help secondary schools and local authorities identify areas of success and where
improvements can be made for pupils in the senior phase. The dashboard has 4 measures. 
Add dashboard 
Add dashboard 
Add dashboard  Add dashboard 
Page 47

Page 48

8 
Improving attainment in literacy and numeracy 
Evaluative Comment – Areas of Strength 
The percentage attaining SCQF level 4 literacy increased to pre-COVID levels with 89.9% of pupils in S4, 92% in S5 and 96.4% in S6 attaining at least level 4
literacy).  This shows a steady improvement year on year for level 4 literacy attainment.
At SCQF level 5 literacy the percentage of S4 pupils attaining literacy increased to higher than pre-Covid levels and was up to 73.42%.  For pupils in S5 and 6
levels remained similar to previous years.
Students in S6 performed as well or better than virtual comparator data for attainment at both level 4 and level 5 literacy.
Evaluative Comment – Areas for Development 
Though there was improvement in literacy across SCQF levels 4 and 5 based on previous years, it remained lower than Virtual Comparator (VC) data.  There
was not a significant dip in numeracy performance in S4 and 5 based on previous attainment at LHS, though it remained significantly lower than VC data for
S4 and S5.  We have made significant changes to the maths and numeracy coursing this session and introduced level 5 numeracy qualifications in S4 to run 
Add image 
Page 48

Page 49

9 
alongside level 5 maths.  We have also now started a policy of dual entry for N4 and N5 maths for pupils who are at risk of not attaining level 5 maths.  This is
alongside the wider focus on teaching and learning, tracking and moderation in the School Improvement Plan. 
Increased post-school participation 
Evaluative Comment – Areas of Strength 
The gains made in session 2020/21 for positive destinations were maintained in session 21/22.  This is due to the continuing work the school does to develop
and strengthen partnerships with Argyll College, universities and local employers.  Pupils who do not intend to follow a route into higher education are very
well supported in finding routes into college, employment and more increasingly a mixture of both (e.g. through Foundation Apprenticeships).  This usually
begins in S4 when pupils begin a much more tailored learning pathway that can involve vocational and skills based courses and opportunities alongside
academic and core subjects.  The development of FLPs of youngster at risk of dis-engaging is highly effective in securing positive destinations for almost all
pupils (98.9%).
Evaluative Comment – Areas for Development 
Page 49

Page 50

10 
This is an area of real strength for the school and we aim to build upon this.  Our target every year now is 100% of pupils who leave school going into a
positive and sustainable destination. We also aim to further develop more bespoke learning plans for earlier than S4 for those who require it, incorporating
core literacy and numeracy into these. 
Improving attainment for all 
Evaluative Comment – Areas of Strength 
Page 50

Page 51

11 
Breaking the data down to year groups shows that S4 pupils in the top 20% at LHS gained more points than VC, A&B and national data.  For the
middle 60% in S4 performance was in line with national and A&B data and slightly above VC. In S5, the highest 20% of pupils performed
similarly to those in VC, A&B and national data (this is based on ‘complementary tariff points’ a measure that takes the best 5 of each pupils’
performances into account and is determined to remove variances of curriculum structures between schools).
Evaluative Comment – Areas for Development 
In S4, the lowest 20% performed poorer than VC data.
By S5 the lowest and middle performing students at LHS perform lower than VC, national and A&B data.
By S6 pupils in each of the three categories performed lower than VC, national and A&B data
When looking at total tariff points (as per the graph above) students in each category perform lower than all comparators. 
In session 22/23 we have introduced additional opportunities for pupils to gain qualifications (tariff points) in a number of different awards
(numeracy, modern studies, IT and admin and National Progress Awards) and we now have plans to further adds to this in the coming years
(Outdoor Learning, Health and Beauty, RMPS Media Studies, Applications of Maths are all to be added before 2024). 
This session, the school has introduced the mentor programme for all pupils in S4 and this will be extended next year to include S5 and S6 pupils
with each pupil retaining the same mentor year on year wherever possible.
Improved approaches to tracking and monitoring across the BGE and senior phases are now in place and this will help to ensure that estimates
and presentations for qualifications are more accurate as well as identifying pupils require additional support and intervention earlier.
Moderation and assessment processes in departments and subject areas are now in place and are beginning to improve the consistency and
accuracy of teacher judgement. 
Page 51

Page 52

12 
Attainment versus Deprivation 
Evaluative Comment – Areas of Strength 
Due to the relatively small numbers of pupils in each SIMD centile, and the rural nature of the areas we serve, SIMD data is less reliable as a
predictor of success and a tool to guide improvement actions as it is for most schools in Scotland.  
Evaluative Comment – Areas for Development 
The data, however is congruent with the information in the tables above – that there is a general need to improve attainment for pupils in each
year group and from each of the different demographic types that we serve.  This is particularly true for children who are identified through the
PEF processes (those who live with financial poverty, are isolated due to rurality, who are care experienced, who have suffered trauma, who
have mental health difficulties, who have a carer responsibility etc.) these are pupils who form part of the current and future PEF planning
process. 
Page 52

Page 53

13 
Wider Achievement Qualifications 
National Certificates; Higher National Certificates; Scottish Vocational Qualifications;  National Progression Awards;
Skills for Work qualifications; Foundation Apprenticeships; Scottish Baccalaureate
Overall evaluative comment/narrative on Wider Achievement Qualifications in your school: 
The Foundation Apprenticeships (FA) offer has increased over past two years.  FA engineering led pupils to graduate apprenticeships.
FA social services, children and young people run through council has been established and take up has been promising.
The school and local employers have established (or re-established) level 4/5 work placement and level 4 employability programmes as well
as the young enterprise company programme (SCQF lvl 6) 
Flexible Learning Plans (FLPs) - Over the session we had 15 FLPs running. We also have two that have carried over to this session and two
more about to start.  This is a rolling programme based on pupil need. 
From FLPs alone, 4 pupils were offered and accepted apprenticeships in 2021/22.   Overall through FLPs, work placements and employer
requests, 11 pupils secured apprenticeships in session 2021/22 and at least one full time job some of these employment opportunities have
come for pupils who had previously disengaged and then re-engaged in school. This has had a significant impact on the very positive rate of
pupils who enter positive post-school destinations. 
We also facilitated extended work placement with Two S6 boys who have both been given Graduate Apprenticeships with Renewable Parts
ltd. Renewable parts also took an S6 pupil for a week placement and a summer job has resulted from this. 
FA engineering ran this year for first time and was successful and 2/3 pupils achieved engineering apprenticeships through our help and
support.
We have begun a partnership with YPI (Youth Philanthropy Initiative) and now plan to run this programme for S3 pupils in the summer term
of session 22/23.
We have worked closely with partners from Argyll College and Live Argyll to develop girls’ and boys’ football teams and this session, our
senior girls’ team reached a national final.
We now have staff qualified to deliver Duke of Edinburgh awards and this programme was launched in session 2022/23 with plans to extend
the offer in subsequent years. 
Page 53

Page 54

14 
Equity and Attainment – Evaluation of Key Factors 
Factor in attainment 
Attendance School Ave. Att. 21-22:  88.35% 
Exclusion No. of Exclusion Incidents 21-22:  4
No. of Exclusion Openings 21-22:  15
The relationships and behaviour policy gave been reviewed, as has the Argyll and Bute exclusion procedure and this
has led to a significant drop in exclusions since August 2022.
Additional Support
Needs
All pupils with ASN have a child’s plan, many of which include targets for literacy and numeracy. We have introduced tutorials for
pupils with significant additional needs in literacy and numeracy as well as an S1 literacy intervention programme for those who
joined S1 with a reading age below 9.0 
SIMD
This is not an accurate predictor for us.  Many people in the same SIMD bracket have vastly different life experiences.  We focus
on engagement and barriers to engagement as the main factors (these might be caused by health issues, anxiety, rural isolation,
young carer responsibilities, care experienced etc.)
Free School Meal
Entitlement
We have a relatively low FSM entitlement and it isn’t always the most accurate indicator of need. We know we have some parents
who chose not to apply, even though they may be entitled.
Care Experienced
(and previously Care
Experienced)
We have a small number of care experienced young people who are supported through the GIRFEC and child’s planning process.
This includes regular reviews, 1:1 mentoring and supported interventions. Some care experienced pupils have flexible learning
plans.
English as Additional
Language
We have three pupils who have arrived from Ukraine and have English as a second language.  All three receive support in class
(1:1 for some of the time, differentiated learning and access to translation devices as well as other differentiation strategies)
Pupil Engagement  For a variety of reasons, including COVID-19, 2021/22 saw an increase in the number of pupils who disengage from
learning.  This ranges from pupils who are school refusers, through to those who find specific elements of school too
difficult to engage with.  This formed the key part of our PEF plan for session 2022/23 and we are starting to see the
impact of the new ‘Well-Being Den’ and the Family Liaison Well-Being Officers. 
Page 54

Page 55

15 
Pupil Equity Funding 
Impact of PEF on closing the attainment gap 
There were three main areas of investment of PEF in session 21/22
1. Literacy and numeracy targeted interventions
Development of tutorial programmes for groups and individuals has improved the literacy and numeracy attainment of PEF identified
young people (evidenced through progress in reading, writing and talking and listening based on teacher judgements and
assessments). 
2. Raising attainment
PT raising attainment collated and shared specific progress data with each department.  This has led to a more consistent
understanding of standards across the whole school (both BGE and senior phase).  This led to a more ambitious presentation policy
(the number of N5 and higher pupils entered for qualifications significantly increased on the previous year) which in turn led to an
increased number of qualifications in specific subjects. 
3. Digital Learning
PT established 1:1 device access for pupils in BGE so that all S1-3 pupils have home and school access to a Chromebook.  All pupils in
S1-2 now have ICT and enterprise education as part of core timetable and this is beginning to lead to better skill development.   
This session, PEF has been specifically targeted at increasing engagement and attendance of specific pupils (those identified by need or
characteristic e.g. Care experienced, economically deprived, those suffering with poor physical or mental health, young carers, trauma
experienced etc.). Though the implementation is ongoing, there are already signs of improvement for pupils and the full impact will form part of
the annual Standards and Quality Report due in June 2023. 
Page 55

Page 56

16 
Other information 
Session 2021/22 was one of recovery where COVID-19 infection levels rose and fell meaning that attendance levels of staff and pupils was
impacted.  Staff worked diligently to ensure that hybrid approaches to learning remained available so that pupils who were absent form school,
but still able to engage in work were able to do so remotely.   
The School enterprise project was a huge success with pupils in the BGE phase learning and using entrepreneurial skills alongside school staff
and local businesses.  We were able to hold a scaled down version of the Christmas craft Fayre and look forward to extending this next
session. 
School sports teams were re-established and there were thriving football, cricket, rugby, netball, badminton, basketball and squash clubs run in
the school.  Teams represented the school in local tournaments in rugby and football (boys and girls teams).  The school film club was also re-
established. 
A new initiative to increase reading and enjoyment of literature was introduced called ‘Regi-Reading’.  This meant that once every four weeks
registration periods were extended to give more time for pupils to read texts of their own choosing for pleasure.  It has helped more pupils to
see reading as a fun pastime and also helped some improve their literacy skills. 
In the summer term, we were able to welcome visitors in and re-establish our awards ceremony and Leavers’ Formal. 
The school filled long-standing teacher vacancies in RME and Business and IT and are now looking forward to being able to offer more
courses at National 5 and Higher in these subjects. 
The Modern Foreign Language department established a Pen-Pal scheme with pupils from schools in Europe and this has increased the
interest, engagement and achievement of pupils in different languages (the school now offers German as well as Spanish and French).   
Page 56

Page 57

17 
The school worked alongside Live Argyll and established a Sports Mentor and a Well-Being Mentor programme where senior pupils were given
leadership training and then helped to promote sports participation as well as advocate for well-being across the campus.  A well-being club
was established by the mentors and supported pupils during the post-COVID return to school. 
The school remembered a much loved and missed member of staff when we unveiled the Isobel Hamilton memorial bench and inaugurated
the Isobel Hamilton Award for Citizenship.  The first winner of this award was head-boy, Archie McColl-Smith for his support of fellow pupils
and all round outstanding contribution to school life. 
Pupils and staff created a variety of celebration, days to raise awareness and money for local and national charities.  In total, over £15,000 was
raised by members of the school community in session 2021/22. 
The annual careers fair was re-established and was very well attended by pupils from across various year groups.  This was hosted at the
school and involved local and national business and academic partners and helped many pupils to choose subject options that lead toward
their chosen post-school destination. 
Session 2021/22 saw a focus on whole campus activities and opportunities to build on the inter-connectedness of the ELC, primary, secondary
and learning centres within the joint campus.  All departments now share a common set of values: Ambition, Attainment, Equity and Respect
and we had a number of successful campus wide events such as the Scottish Salmon skills for work day where pupils in all parts of the
campus learned from visitors about the role of aquaculture in the local economy, the skills required for success in work, learning and life and
the employment opportunities locally. 
Page 57

Page 58

This page is intentionally left blank

Page 59

ARGYLL AND BUTE COUNCIL SECONDARY SCHOOL ATTAINMENT REPORT
AREA COMMITTEE 
SCHOOL BADGE       
Tarbert Academy 
June 2023 
Page 59
Agenda Item
8

Page 60

Tarbert Academy is a 2-18 school located in the village of Tarbert comprising three stages of schooling. The Pre-5 unit serves the village and near environs of Tarbert. The
Primary serves the village and the surrounding community; and the Secondary serves the communities of South Knapdale and North Kintyre. In addition to its own
Primary, the school's associated Primary is Clachan Primary School. Pupils in Rhunahaorine Primary School and Gigha Primary School can decide between Tarbert
Academy and Campbeltown Grammar School - as both are funded for transport - with almost all choosing Tarbert Academy for secondary education.
The school roll in May 2023 was 250 pupils with 29 in Pre-5, 111 in Primary and 110 in Secondary. 22% of the Secondary roll and 15% of Primary are placing requests.
SIMD distribution is between decile 3 and 7 with no clear attainment gap (Lower SIMD pupils often outperform higher SIMD pupils). £15490 PEF has been allocated each
year until 2025/2026.
Our staffing comprises 25 teachers with 7 in Primary and 18 in Secondary, some of whom work part time. In addition, learning and teaching is supported by Pre-5 staff,
technicians and classroom assistants. The school also has an allocation of Additional Support Needs staff from the Authority (16 ASN assistants and 2 Pupil Support
teachers – some of whom work part time).
Promoted posts consist of Head Teacher, Depute Head Primary, Depute Head Secondary, PT Support for Learning 2-18, 1 Primary PT, 4 Secondary Faculty PTs, PT
Guidance, PT Enterprise.
In our school office we are currently staffed by a senior clerical assistant and three clerical assistants 
The original school building was constructed in 1896 and is still used today.  New accommodation was phased in during the mid-1990s and is used to house the Primary,
Assembly Hall, Office and School Kitchen.  In the year 2000, the school also became home to our Pre-5 unit and in 2014 an Early Level classroom with its own toilet block,
kitchen and outdoor play area was built in the Primary Department. Further developments were made to the Pre 5 unit in 2019 to allow 1140h entitlement for 3 and 4
year olds to be met. From August 2021 we have been able to accommodate 2 year olds.
Following consulatation with staff, pupils, parents and agencies our current Vision, Values and Aims was launched in August 2019:
Our vision is for Tarbert Academy to be part of a learning community that actively promotes and supports the school values and provides the opportunity for every
learner to develop the skills, knowledge and attitudes they need to become a successful learner, confident individual, responsible citizen and effective contributor to
society.
We value: 
Respect for ourselves and others
Unity, with every member of the 2-18 learning community working together to turn our vision into reality
Achievement, with every learner having the opportunity to reach their full potential
Nurture, ensuring every learner has the best start in life and a safe place to grow up
Kindness, with every member of the learning community looking out for each other 
We aim to ensure that every learner develops the skills they need to allow them to live a fulfilled, active and adventurous life and to deal with adversity when it occurs 
Page 60

Page 61

S3 ACEL Attainment in Literacy and Numeracy   
School Level % Achieved
Reading Writing L&T Literacy Numeracy
Tarbert Academy Third Level or better 94.7 89.5 94.7 89.5 89.5
Argyll & Bute Third Level or better 88.3 87.0 88.2 83.9 87.8
Tarbert Academy Fourth Level 57.9 57.9 57.9 57.9 63.2
Argyll & Bute Fourth Level 49.8 47.6 51.5 45.9 57.6 
Evaluative Comment – Areas of Strength in BGE Attainment:
Literacy has been an area of development for us recently and continues to be with significant investment in resources and training (Fresh Start). This data
suggests that literacy attainment is good in the BGE in secondary.
Numeracy data also looks good this year.
All Literacy and Numeracy values are above A&B values – see green highlight. 
Evaluative Comment – Areas for Development in BGE Attainment:
Moderation is being further developed as part of our school improvement planning. Departments are being encouraged to work with other schools to ensure
confidence in assessment data.
Page 61

Page 62

National Qualifications – Pass rates 
NATIONAL
QUALIFICATIONS
2021-22
A-C 
Number of
Presentations 
Number 
Attaining A-C
% Attaining A-
C
Argyll and
Bute %
Attaining A-C
National %
Attaining A-C
Advanced Higher 7 7 100% 85.50% 82.60%
Higher 68 43 64.71% 80.90% 80.30%
National 5 113 75 66.37% 79.70% 81.60% 
Tarbert Academy 2022         Level /
Stage A B C D No Award A-B A-C A-D
National 5
18.58%
Nat 41.2%
A&B 35.4%
28.32%
Nat 23%
A&B 25.57%
19.47%
Nat 17.43%
A&B 18.69%
16.81%
Nat 10.79%
A&B 12.73%
16.81%
Nat 7.6%
A&B 7.6%
46.90%
Nat 64.2%
A&B 61%
66.37%
Nat 81.6%
A&B 79.7%
83.19%
Nat 92.4%
A&B 92.4%
S4 19.77% 33.72% 19.77% 16.28% 10.47% 53.49% 73.26% 89.53%
S5 14.81% 11.11% 18.52% 18.52% 37.04% 25.93% 44.44% 62.96%
Higher
11.76%
Nat 36.5%
A&B 35.6%
27.94%
Nat 24.32%
A&B 24.56%
25.00%
Nat 19.49%
A&B 20.8%
22.06%
Nat 11.74%
A&B 12.61%
13.24%
Nat 7.9%
A&B 6.5%
39.71%
Nat 60.9%
A&B 60%
64.71%
Nat 80.3%
A&B 80.9%
86.76%
Nat 92.1%
A&B 93.5%
S5 9.80% 31.37% 25.49% 19.61% 13.73% 41.18% 66.67% 86.27%
S6 12.50% 18.75% 25.00% 31.25% 12.50% 31.25% 56.25% 87.50%
Advanced Higher (S6)
28.57%
Nat 35%
A&B 30.8%
42.86%
Nat 26.28%
A&B 26.09%
28.57%
Nat 21.35%
A&B 28.99%
0.00%
Nat 11.27%
A&B 11.59%
0.00%
Nat 6.2%
A&B 3.2%
71.43%
Nat 61.2%
A&B 56.7%
100.00%
Nat 82.6%
A&B 85.5%
100.00%
Nat 93.8%
A&B 96.8% 
Page 62

Page 63

Evaluative Comment – Areas of Strength 
Advanced Higher A-C pass rates are 100% 
Evaluative Comment – Areas for Development 
We had a high rate of no awards last year but due to Covid we were giving many pupils the benefit of doubt and presenting them for the exam when they were
predicted to fail. 
The number of A passes was disappointingly low last year for Nat5, Higher and Advanced Higher and this is something that we are working on through our
school improvement planning 
Page 63

Page 64

Insight Dashboard 
What is Insight Scotland?
Insight is a professional tool, aimed at teachers and other staff. It is used to help secondary schools and local authorities identify areas of success and where
improvements can be made for pupils in the senior phase. The dashboard has 4 measures: 
1. Improving attainment in literacy and numeracy 
Page 64

Page 65

Page 65

Page 66

Evaluative Comment – Areas of Strength 
For the last 2 years, all of our leavers have attained at least SCQF4 in both literacy and numeracy and for the last 5 years in numeracy.
Although it dipped below the virtual comparator last year, SCQF5 data had been above the VC for the previous 4 years in numeracy while our literacy data
has shown an improvement at this level over the last couple of years to match or better the VC.
Evaluative Comment – Areas for Development 
SCQF5 numeracy data is below the VC for last year.
We will monitor SCQF 5 level numeracy carefully to ensure that our previously positive pattern of attainment is maintained and will continue to
develop literacy resources and staff training.
Page 66

Page 67

2. Increasing post-school participation 
Evaluative Comment – Areas of Strength 
For 3 out of the last 5 years, all of our leavers have gone on to a positive destination. 
Evaluative Comment – Areas for Development 
For the other 2 years we have monitored through DYW networks the small number of young people who didn’t go directly into a positive situation and offered
advice and support – all are now in positive destinations 
Page 67

Page 68

3. Improving attainment for all 
Evaluative Comment – Areas of Strength 
For the last 5 years, total tariff points have been higher than the VC for our lowest attaining 20% of our leavers
For 4 out of the last 5 years, total tariff points have been higher than the VC (lower than VC in 2019) for our middle attaining 60% of our leavers 
Evaluative Comment – Areas for Development 
For 3 out of the last 5 years, total tariff points have been lower than the VC (higher than VC in 2018 and 2021) for our highest attaining 20% of
leavers. We are aware of this worrying pattern and are looking at ways of improving the situation as part of our school improvement planning.
Page 68

Page 69

4. Attainment versus Deprivation 
Evaluative Comment – Areas of Strength 
We do not have an obvious poverty related attainment gap in Tarbert – we have a very narrow range of SIMD values (usually between 4 and 7
with an occasional 3 due to placing requests) and none of our young people are in the poorest 2 deciles).
The data for last year does show the attainment increasing along SIMD deciles from 5 to 7 but this is not a consistent pattern – the trend is often
the other way round with lower decile pupils attaining more tariff points than higher decile pupils. 
Evaluative Comment – Areas for Development 
We have a strong and effective Pupil Support team at Tarbert Academy and we will continue to target support, using PEF funding if required, to
those who need it. 
Page 69

Page 70

Wider Achievement Qualifications 
National Certificates; Higher National Certificates; Scottish Vocational Qualifications;  National Progression Awards;
Skills for Work qualifications; Foundation Apprenticeships; Scottish Baccalaureate
Overall evaluative comment/narrative on Wider Achievement Qualifications in your school: 
We offer a wide range of wider curricular opportunities and we are able to be flexible enough to satisfy the curricular
requirements of all of our young people using our own staff or online learning links with other schools or colleges. 
Last year we offered: 
 1 x FA Creative Digital Media
 4 x NPA Data Security
 5 x Enterprise and Employability Units
 10 x Leadership
 Hi5 award
 1 x NPA Computer Games Design
 1 x SfW Health Sector
 Four S4 students gained John Muir Awards
 Five S3 students achieved a Dynamic Youth Award
 One student achieved a distinction in her YASS course 
Pre Covid we had a very strong DofE group with regular silver and gold awards – this year we have 6 pupils working on silver
and 5 on bronze and we hope to get back to pre covid numbers again soon. 
Page 70

Page 71

Equity and Attainment – Evaluation of Key Factors 
Factor in attainment 
Attendance
2021-22
Tarbert Academy:    89.1%
A&B:                         87.38% 
Exclusion No. of Exclusion Incidents 21-22:  0
No. of Exclusion Openings 21-22:  0
Additional
Support Needs
43% of secondary pupils 
SIMD
2.8% D3, 
15.7% D5
58.3% D6 
21.3% D7
Free School
Meal
Entitlement
12%
Care
Experienced
(and previously
Care
Experienced)
4.5%
English as
Additional
Language
0
Other (give
details) 
Page 71

Page 72

Pupil Equity Funding 
Impact of PEF on closing the attainment gap 
£15490 PEF has been allocated each year until 2025/2026.
We have used this funding over the years to target certain pupils for ASN Assistant support (prioritising Literacy and Numeracy) or Family
Liaison Officer support as well as supporting families with the cost of school trips, uniform etc 
Although we have no SIMD 1 or 2 pupils and very few SIMD 3 or 4 pupils, we do know our families very well and have a good idea of who
would benefit from financial support as well as targeted ASN support or support with attendance 
Other information 
Our S3 profiling class has been very successful over the last 2 years with their Youth Philanthropy Initiative projects which have raised £6000
for local charities so far. This year’s class will be presenting their projects to a judging panel, S1-3 pupils and some parents at the end of May.
The winning group will get another £3000 to donate to a local charity (funding from the Wood Foundation). 
Page 72

Page 73

1 
Argyll and Bute Council 2022 - 2023    
OUR CHILDREN…
THEIR FUTURE…
Education Service 
Primary Area Attainment Report:  
Mid Argyll, Kintyre and the Islands (MAKI)
Page 73 Agenda Item 9

Page 74

2 
Introduction 
Within the MAKI area there are 23 primary schools and two 3-18 schools offering primary
provision. 7 of the Primary Schools are based on the islands of Coll, Gigha, Islay and Jura.
There is secondary school provision in Islay High School,  Campbeltown Grammar, Tarbert
Academy and Lochgilphead Joint Campus.  Nursery provision is provided within several of
these schools (and Gaelic medium education is provided at Bowmore Primary).  Our primary
school rolls vary considerably ranging from 2 pupils at Furnace Primary to over 213 at
Dalintober Primary. 
This report provides a range of key information about school provision during the school
session August 2022 to June 2023 and reports the National collection of attainment and
achievement data from June 2022. 
Additional and more detailed information about each school can be found in the schools’
Standards and Quality Reports.  In addition each school’s Improvement Plan outlines their main
priorities for improvement.  Most schools have an active website where these documents can
be accessed and further links or information can be obtained from the Head Teacher.   
Page 74

Page 75

3 
Mid Argyll, Kintyre and the Islands School Profiles 2018/19-2022/23
Cluster Primary Schools 18/19 19/20 20/21 21/22 22/23
%
change
in Roll
over 5
years1
Achahoish Primary School 10 6 6 6 7 -30%
Ardrishaig Primary School 96 91 94 102 92 -4%
Arinagour Primary School                           7 8 6 6 5 -29%
Bowmore Primary School                             65 57 51 55 56 -14%
Bowmore Primary School
Gaelic Unit                 14 16 14 16 18 +29%
Carradale Primary School                           18 16 16 11 11 -39%
Castlehill Primary School                          210 205 203 194 189 -10%
Clachan Primary School                             8 6 6 4 9 +13%
Craignish Primary School                           23 24 19 23 24 +4%
Dalintober Primary School                          250 255 240 229 213 -15%
Drumlemble Primary School                          27 32 31 26 26 -4%
Furnace Primary School                             13 12 10 9 2 -85%
Gigha Primary School                               13 10 10 11 12 -8%
Glassary Primary School                            26 22 23 31 29 +12%
Glenbarr Primary School                            4 7 10 8 4 -
Inveraray Primary School                           64 65 69 62 66 +3%
Keills Primary School                              30 29 30 34 37 +23%
Kilchattan Primary School                          4 6 8 2 3 -25%
Kilmartin Primary School                           27 35 38 27 30 +11%
Lochgilphead Primary School                        227 226 207 212 204 -10%
Port Charlotte Primary School                      39 39 31 27 28 -28%
Port Ellen Primary School                          55 59 58 64 72 +31%
Rhunahaorine Primary School                        13 10 10 12 11 -15%
Small Isles Primary School                         19 16 19 20 20 +5%
Tarbert Primary School                             96 103 109 116 109 +14%
Tayvallich Primary School                          21 21 25 22 22 +5%
Total 1379 1376 1343 1329 1299 -6% 
* Data for rolls provided at Census each year 
1 Please note the % change in Roll over 5 years shows the percentage change in roll figures from 2018/19 to 2022/23
and is not an average. 
SIMD Profile 
SIMD is the Scottish Government's standard approach to identify areas of multiple deprivation in
Scotland, with SIMD 1 indicating areas of highest deprivation and SIMD 10 indicating the least
deprived.  It can help improve understanding about the outcomes and circumstances of people
living in the most deprived areas in Scotland. It can also allow effective targeting of policies and
funding where the aim is to wholly or partly tackle or take account of area concentrations of
multiple deprivation.   
Page 75

Page 76

4 
Table shows number of pupils at each SIMD level in each area of Argyll and Bute.
Area 1 2 3 4 5 6 7 8 9 10
Unkn
own TOTAL
Bute and
Cowal 186 159 233 108 255 219 32 0  17 0 20 1229
HALCO 40 83 105 50 130 223 274 352 192 138 33 1620
MAKI  0 84 115 137 128 568 301  0 0 1 4 1338
OLI 18  0 5 166 389 236 408 107 0  0 92 1421
Total 244 326 458 461 902 1246 1015 459 209 139 149 5608 
* SIMD data from March 2023 
Footwear and Clothing Grant and Free School Meal Information for AREA 
 Clothing and Footwear Grant (CFG) is not shown as a National Average as each authority set
their own criteria and therefore cannot be compared accurately. Please note that 2022-20223
data for CFG and Free School Meals (FSM) is to date (end February 2023) and therefore may
change as the year progresses. 
 In January 2022, the Scottish Government launched the extension of free school meal universal
eligibility to include all children in primary 1-5. The above figures only show those pupils in P6
and P7. 
 In August 2021 the Scottish Government introduced a School clothing grant minimum for all
authorities set at £120 for Primary pupils and £150 for Secondary pupils. 
 During session 2020/21 the Scottish Government introduced ‘Bridging’ payments of £130 per
Page 76

Page 77

5 
pupil in receipt of FSM under the National criteria (this excludes anyone eligible who receive
FSM in P1 to P6 who do not qualify financially). These payments are made 4 times per year
(Easter, Summer, October and Christmas).Further information can be found at Scottish Child
Payment Bridging Payments - mygov.scot.  In addition to this anyone eligible for these
payments have been paid a FSM payment during the school holiday period. Further information
School meals - mygov.scot 
Exclusion and Attendance Information for AREA 
 Authorised absence includes bereavement, short – term exceptional domestic situations,
religious observance, weddings of immediate family. Unauthorised absence includes truancy,
unexplained absence and most family holidays during term time. Attendance and absence is
outlined in Management Circular 3.03. 
 During 2020/21 there were additional attendance codes added for COVID. These codes can
count as attendance, authorised absence or unauthorised absence depending on the
circumstance. 
 Please note that attendance data for 2022/23 is up to 28 February and not a complete year. It
is therefore subject to change. 
 Please note that exclusion data for 2022/23 is up to 28 February and not a complete year. It is
therefore subject to change. 
Page 77

Page 78

6 
Additional Support needs 
Table below indicates the numbers of pupils identified as having Additional Support needs across
the MAKI area at each stage of primary schools. 
Care Experienced Children and Young People
A virtual Head Teacher took up post in April 2023. The core purpose of the role of the Virtual Head
Teacher is to be relentless in driving improvements in the educational progress and
attainment/achievement of an identified group of young people, including Care Experienced,
across Argyll and Bute. The core function of the Virtual Head Teacher in terms of planning is to
ensure that all children have access to appropriate and timely support achieved by collaborating
with relevant professionals to ensure plans are of a high quality, with impact and outcomes
followed up.
The table below shows the numbers of care experienced children in our primary schools across
each area of the Council. 
Area Previously looked
after
Looked after at
home
Looked after
away from
home. 
Total
HALCO 14 4 11 29
OLI 13 2 5 20
MAKI 21 8 5 34
B&C 21 12 23 56 
Page 78

Page 79

7 
Attainment of Curriculum for Excellence Levels over time
Curriculum levels are national levels to describe different stages of learning and progress. For
most children the expectation is:       
Throughout the Broad General Education, children and young people are assessed and decisions
are made by teachers on when a child or young person has achieved learning at a particular level.
This means that they have broadly covered the experiences and achieved the expected outcomes
for that level. In making this decision, the teacher takes into account the evidence mentioned
above, and considers the benchmarks produced by Education Scotland for each level as well as
diagnostic feedback from the National Standardised Assessments (NSAs). Attainment of
Curriculum for Excellence Levels (ACEL) data is collected annually each June by the Scottish
Government. The data collection collects information on pupil performance in four areas, known as
organisers. Organisers consist of Numeracy and the three literacy components; Reading, Writing
and Listening and Talking. A combined literacy measure is also produced based on the three
literacy organisers: reading, writing and listening and talking. The data is collected for pupils at the
key stages of P1, P4,P7 and S3. 
Achievement of Curriculum for Excellence Levels across MAKI schools: June 2017-June 2022 
Page 79

Page 80

8 
NOTES:
ER English reading, EW English writing, ELT English Listening and talking N Numeracy
GR Gaelic reading, GW Gaelic writing, GLT Gaelic Listening and talking.
There was no ACEL collection during session 2019/20 due to COVID 
 In English medium by June 2022: 
 In reading, 64.97% of P1 pupils in the MAKI area achieved early level, this is
compared with 75% at authority level and 79% nationally
 In writing, 58.60%% of P1 pupils in the MAKI area achieved early level, this is
compared with 68% at authority level and 77% nationally
 In talking and listening, 71.34% of P1 pupils in the MAKI area achieved early level,
this is compared with 81% at authority level and 86% nationally. 
 In numeracy, 71.34% of P1 pupils in the MAKI area achieved early level, this is
compared with 78% at authority level and 84% nationally. 
 In reading, 60% of P4 pupils in the MAKI area achieved early level, this is compared
with 71% at authority level and 76% nationally
 In writing, 48.51% of P4 pupils in the MAKI area achieved early level, this is
compared with 61% at authority level and 70% nationally
 In talking and listening, 66.34% of P4 pupils in the MAKI area achieved early level,
this is compared with 78% at authority level and 85% nationally. 
 In numeracy, 62% of P4 pupils in the MAKI area achieved early level, this is
compared with 65% at authority level and 75% nationally. 
 In reading, 70.33% of P7 pupils in the MAKI area achieved early level, this is
compared with 74% at authority level and 79.33% nationally
Page 80

Page 81

9 
 In writing, 61% of P7 pupils in the MAKI area achieved early level, this is compared
with 67% at authority level and 73% nationally
 In talking and listening, 82% of P7 pupils in the MAKI area achieved early level,
this is compared with 82% at authority level and 86% nationally. 
 In numeracy, 66% of P7 pupils in the MAKI area achieved early level, this is
compared with 65% at authority level and 76% nationally. 
 In Gaelic medium by June 2022: 
 In reading, 75% of P1 pupils in the MAKI area achieved early level, this is compared
with 82% at authority level and 83% nationally
 In writing, 75% of P1 pupils in the MAKI area achieved early level, this is compared
with 79% at authority level and 80% nationally
 In talking and listening, 75% of P1 pupils in the MAKI area achieved early level,
this is compared with 82% at authority level and 84% nationally. 
 In reading, 100% of P4 pupils in the MAKI area achieved first level, this is compared
with 76% at authority level and 71% nationally
 In writing, 100% of P4 pupils in the MAKI area achieved first level, this is compared
with 68% at authority level and 63% nationally
 In talking and listening, 100% of P4 pupils in the MAKI area achieved first level,
this is compared with 68% at authority level and 63% nationally. 
 In reading, 100% of P7 pupils in the MAKI area achieved second level, this is
compared with 65% at authority level and 75% nationally
 In writing, 100% of P7 pupils in the MAKI area achieved second level, this is
compared with 43% at authority level and 66% nationally
 In talking and listening, 100% of P7 pupils in the MAKI area achieved second level,
this is compared with 68% at authority level and 80% nationally. 
Argyll and Bute Stretch Aims Session 2022-23 (Authority Level)
The Scottish Attainment Challenge (SAC) is about achieving equity in educational outcomes, with
a particular focus on closing the poverty-related attainment gap.  SAC funding is provided to all of
Scotland’s local authorities to help tackle the attainment gap and support education recovery and
improve outcomes for children and young people most impacted by poverty. The Scottish
Attainment Challenge aims to raise the attainment of children and young people living in deprived
areas, in order to close the equity gap.
Attainment Advisors within Education Scotland’s regional improvement teams work with authorities
to identify core attainment measures and specific aims (Stretch Aims) which, informed by local
evidence and data, are identified as local priority areas for improvement. The stretch aims are
intended to be both ambitious and achievable within local contexts and targets are specific to
individual authorities. Progress towards achieving the current stretch aims will be reported on later
in 2023. 
The Stretch Aims are intended to support recovery from the pandemic and accelerate progress in
closing the attainment gap and include:
 Achievement of Curriculum for Excellence Levels (literacy P1/4/7 combined and
numeracy P1/4/7 combined)
The stretch aims for literacy and numeracy identify the percentage of young people who achieve
their expected Curriculum for Excellence (CfE) level:
 An overall attainment target, which includes all young people 
Page 81

Page 82

10 
 An attainment target for young people who live in the most deprived areas (SIMD quintile 1)
 An attainment target for young people who live in the  least deprived areas (SIMD quintile
5)
 A target to reduce the attainment gap between the most and least deprived young people 
The Argyll & Bute literacy and numeracy tables illustrate the progress from the 2021 ‘post
pandemic’ ACEL collection, through the most recent ACEL collection in 2022 (published
December 2022), to the Stretch Aim targets in place for 2023.
The year-on-year trend in ACEL data has been positive; in the two-year period between 2021 and
2022  the overall proportions of primary school pupils achieving the expected levels in literacy had
increased by 3 percentage points, while in numeracy there had been an increase of 4 percentage
points.
The percentage of Quintile 1 (most deprived) young people who achieved their expected CfE level
has increased by 5% in literacy and 10% in numeracy between 2021 and 2022. 
Scottish Attainment Challenge - Stretch Aim 2023: Literacy 
In literacy, the attainment gap between young people from the most and least deprived areas of
Argyll & Bute was 33 percentage points in 2021, and by 2022 this narrowed to 27 percentage
points.  Argyll & Bute’s target is to reduce the attainment gap to 21.5 percentage points by 2023. 
Literacy                P1/4/7
combined                Dec 22
update
Overall SIMD Q1 SIMD Q5 GAP (Q1-Q5)
ACEL 2021 59% 48% 81% 33pp
2022 ACEL          (published
Dec 22)
62% 53% 80% 27pp
Stretch Aims 2022/23 68.4% 60% 81.5% 21.5pp
Improvement Target (p.p.
2021-2023)
9.4pp 12pp 0.5pp 11.5pp 
Literacy 
P1/4/7 combined Overall SIMD Q1 SIMD Q5 Gap (Q1-Q5)
ACEL June 2021 59% 48% 81% 33pp
Provisional 2022 ACEL data 62.2% 54.8% 79.2% 24.4pp
OCT 22 Projections 62.5% 63.7% 77.8% 14.1%
Feb 23 Projections* 65.7% 68.6% 77.8% 9.2%
Stretch Aim   2022/23         68.4% 60% 81.5% 21.5pp
Improvement Target (p.p.
2021-2023) 9.4pp 12pp 0.5pp 11.5pp
*RAG’d against 2023 Stretch Aim 
Page 82

Page 83

11 
In literacy, the attainment gap between young people from the most and least deprived areas of
Argyll & Bute was 33 percentage points in 2021, and by 2022 this narrowed to 27 percentage
points.  Argyll & Bute’s target is to reduce the attainment gap to 21.5 percentage points by 2023. 
Scottish Attainment Challenge - Stretch Aims 2023: Numeracy 
In numeracy, the attainment gap between young people from the most and least deprived areas of
Argyll & Bute was 29 percentage points in 2021, and by 2022 this narrowed to 18 percentage
points.  Argyll & Bute’s target is to reduce the attainment gap to 13.5 percentage points by 2023. 
Numeracy 
P1/4/7 combined
Dec 22 update
Overall SIMD Q1 SIMD Q5 GAP (Q1-Q5)
ACEL 2021 69% 58% 87% 29pp
2022 ACEL            
(published Dec 22)
73% 68% 86% 18pp
Stretch Aims    2022/23 75% 74% 87.5% 13.5pp
Improvement Target  
(p.p. 2021-2023)
6pp 16pp 0.5pp 15.5pp 
Numeracy P1/4/7 Overall SIMD Q1 SIMD Q5 GAP (Q1-Q5)
Current Level (ACEL June
2021) 69% 58% 87% 29pp
Provisional 2022 ACEL data 72% 69% 83.5% 14.4%
OCT 22 Projections 69% 69.6% 84.2% 14.6%
Feb 23 Projections* 71% 72% 83.9% 11.9%
Stretch Aim   2022/23          75% 74% 87.5% 13.5pp
Improvement Target (p.p.
2021-2023)  6pp 16pp 0.5pp 15.5pp
*RAG’d against 2023 Stretch Aim 
Page 83

Page 84

12 
The table below outlines the National expectations of when most children and young people may
achieve each level: 
CfE Level  Stage 
Early The final two years of early learning and
childcare before a child goes to school and
P1, or later for some. 
First To the end of P4, but earlier or later for
some. 
Second To the end of P7, but earlier or later for
some. 
Third and fourth S1-S3, but earlier or later for some. 
Further information: 
National Improvement Framework for Scottish Education –
https://www.gov.scot/policies/schools/national-improvement-framework/ 
Page 84

Page 85

13 
Initiatives to raise attainment and achievement 
In response to data and evidence gathered in the areas of literacy, numeracy and health and
wellbeing, a range of work has been undertaken in order to drive forward improvement and raise
attainment and achievement across the authority. 
Literacy
 8 schools have undertaken training in using a Quality Improvement approach to support writing
attainment at 1st level. The training was originally offered by CYPIC and is now being delivered
within the authority, supported by allied health professionals. Data shows that attainment at 1st
level within the first set of schools to undertake the training has increased from an average of
56.2% in 2022 to an average of 72.8% based on Feb 23 predictions. 
 4 schools are undertaking training provided by Talk for Writing to support the development of
sound pedagogical approaches to writing across their settings. The schools have set clear
stretch aims for each class, against which attainment will be evaluated as implementation of
the approach continues. 
 Bespoke support has been offered to schools, covering aspects of literacy such as approaches
to reading comprehension, writing pedagogy, emerging literacy and 1 to 1 reading
interventions. 
Numeracy
 Schools within HALCO and Mull clusters have worked with Dr Lio Moscardini to develop
cognitively guided instruction, an approach to problem solving within schools. As of March
2023, 73.3% of staff were confident that CGI was having or would have a positive effect on
pupils, 13.3% were extremely confident. Evidence from Head Teachers and practitioners
shows that this approach has had a particular impact on lower ability pupils: by giving pupils
different opportunities to approach their work, practitioners report that it has levelled the playing
field in classrooms.
 Authority-wide, numeracy based CLPL has been delivered to a total of 78 practitioners
representing all cluster areas, focusing primarily on the development of SEAL (stages of early
arithmetical learning) to support foundation skills in mathematical thinking. Support has also
been offered to ASN departments in 2 secondary schools. Numeracy ACEL attainment data
has risen from 69% across P1,4 & 7 in 2021 to a projected 70.95% as of Feb 23. 
Wellbeing , Rights and Relationships
As part of COVID renewal plans, schools have had a continued focus on positive relationships
focussing and the health and well-being of learners.  The Exchange are now providing a
counselling service for pupils aged 10+ within schools, again, this is helping to support the
wellbeing needs of pupils.  A focus on play pedagogy and outdoor learning alongside
developments in the health and wellbeing curriculum have also been an important focus within
school improvement plans to help support wellbeing. 
As it is anticipated that the United Nations Rights of the Child will become law later this year, a
UNCRC Conference for Head Teachers was held in November 2022.  The Rights Respecting
Schools Award continues to support schools in developing awareness of children’s rights across
our school communities as well as imbed a rights based approach within the school environment. 
In the past year, 16 schools have progressed their Rights Respecting Schools Journey.  With 45
Primary schools on their accreditation journey to achieve with UNICEF, 31 have achieved Bronze,
10 Silver, 4 Gold and a further 11 have registered to date.  A further 4 Silver accreditation visits
are due to take place between now and the end of term.  Support sessions for registered schools
Page 85

Page 86

14 
(not yet accredited) and information session for schools yet to register are also being delivered.   
Equality and diversity has been a key focus for professional learning for staff. The career long
professional learning sway has provided a range of opportunities for staff to develop their
professional knowledge and reflect on the practice within this area.  As part of the Period Products
(Free Provision) (Scotland) Act 2021, schools have engaged in the My Tribe project which has
made period products available to pupils and staff across all our schools.  The launch of My Tribe
has been supported by two launch events and online webinars.  The webinar was recorded and
shared with practitioners to ensure that information was accessible post this series of support
events.   
Schools have enjoyed welcoming partners back into school to support the delivery of key aspects
of the curriculum.  The health and wellbeing drama productions that are delivered in partnership
with our colleagues in NHS returned to face to face delivery.  A total of 54 primary schools
attended the Smoke Free Me production that was aimed at P6/P7 pupils.  The performance was
updated to include information and scenarios around vaping.   
Head Teachers have received information with regards to key messages that have been
concluded from the March 2022 PIE Census.  With the updated national data released in
November, we were also able to draw comparisons against the national data.  Developments in
this area have been enhanced with professional learning from Connect who support the
partnership between parents/carers, parent councils and schools.  Schools and parent councils
are responding to the needs of their community in how they are structuring events and meetings
with many Parent Council meetings continuing to take place virtually, increasing accessibility and
reducing travel requirements.  The partnership working is also helping school communities
respond to financial and environmental pressures with examples of good practice including
Christmas jumper/dress swaps. 
Page 86

Page 87

15 
School Contacts
ESTABLISHMENT NAME NAME TITLE ADDRESS POST
CODE
TELEPHONE
NO.
Achahoish Primary School Lucy Blake Head Teacher
Shared
Headship
Clachan
Achahoish Primary
School
Achahoish,
Lochgilphead,
Argyll
PA31 8NZ 01880 770288
Ardrishaig Primary School Louise
Paterson
Head Teacher Ardrishaig Primary
School
Ardrishaig,
Argyll
PA30 8HF  01546 603695
Arinagour Primary School Sharon Burt Head Teacher
Shared
Headship
KIlninver
Arinagour Primary
School
Carnan Rd, 
Isle of Coll 
PA78 6TA 01879 230376
Bowmore Primary School Maureen
MacDonald
Head Teacher
Shared
Headship
Port Ellen
Bowmore Primary School
Bowmore,
Isle of Islay, 
Argyll
PA43 7JX 01496 810522
Carradale Primary School Richard Long Head Teacher
Shared
Headship
Drumlemble,
Castlehill
Carradale Primary
School
Carradale,
Campbeltown,
Argyll
PA28 6SD 01583 431244
Castlehill Primary School Richard Long Head Teacher
Shared
Headship
Carradale,
Drumlemble
Castlehill Primary School
Campbeltown,
Argyll
PA28 6LE 01586 553446
Clachan Primary School Lucy Blake Head Teacher
Shared
Headship 
Achahoish
Clachan Primary School
Clachan,
Tarbert,
Argyll
PA29 6XL 01880 740258
Craignish Primary School Donna
Scholefield
Head Teacher Craignish Primary
School
Ardfern,
Lochgilphead,
Argyll
PA31 8QN 01852 500652
Page 87

Page 88

16 
Dalintober Primary School Caroline
Armour
Head Teacher Dalintober Primary
School
Dalaruan Street,
Dalintober,
Campbeltown,
PA28 6HG 01586 552053
Drumlemble Primary School Richard Long Head Teacher
Shared
Headship
Carradale
Castlehill
Drumlemble Primary
School
Drumlemble,
Campbeltown,
Argyll
PA28 6PN 01586 810240
Furnace Primary School Sandra Clarke Acting Head
Teacher
Shared
Headship
Inveraray
(Temporary)
Furnace Primary School
Furnace,
Inveraray,
Argyll
PA32 8XN 01499 500627
Gigha Primary School Lucy Blake Acting Head
Teacher
Shared
Headship
Achahoish/
Clachan
(Temporary) 
Gigha Primary School
Isle of Gigha,
Argyll
PA41 7AA 01583 505259
Glassary Primary School Lena Carter Head Teacher
Shared
Headship
Tayvallich
Glassary Primary School
Glassary,
Lochgilphead,
Argyll
PA31 8QA 01546 605219
Glenbarr Primary School Caroline
Armour
Head Teacher
Shared
Headship
Dalintober
Glenbarr Primary School
Glenbarr,
Argyll
PA29 6UT 0158 3421292
Inveraray Primary School Sandra Clarke  Head Teacher
Shared
Headship
Furnace
Primary
Inveraray Primary School
Inveraray,
Argyll
PA32 8YH 01499 302218
Keills Primary School Andrew Welch Head Teacher
Shared
Headship
Small Isles
Keills Primary School
Port Askaig,
Isle of Islay,
Argyll
PA46 7RF 01496 840657
Kilchattan Primary School Kim Bentley Head Teacher Isle of Colonsay, 
Argyll 
PA61 7YR 01951200340
Page 88

Page 89

17 
Kilmartin Primary School Namaste Bevan Head Teacher Kilmartin Primary School
Kilmartin,
Lochgilphead,
Argyll
PA31 8QF 01546 510293
Port Charlotte Primary
School
Maggie
MacLellan
Head Teacher Port Charlotte Primary
School
Port
Isle of Islay,
PA48 7TW 01496 850327
Port Ellen Primary School Maureen
MacDonald
Head Teacher
Shared
Headship
Bowmore
Port Ellen Primary
School
Port
Isle of Islay,
PA42 7BW 01496 302141
Rhunahaorine Primary
School
Catriona Brown Head Teacher Rhunahaorine Primary
School
Tayinloan,
Tarbert,
Argyll
PA29 6XG 01583 441269
Small Isles Primary School Andrew Welch Head Teacher
Shared
Headship
Keills
Small Isles Primary
School
Small
Isle of Jura,
PA60 7XG 01496 820244
Tayvallich Primary School Lena Carter Head Teacher
Shared
Headship
Glassary
Tayvallich Primary
School
Tayvallich,
Lochgilphead,
Argyll
PA31 8PW 01546 870220      
JOINT CAMPUSES     
ESTABLISHMENT NAME NAME TITLE ADDRESS POSTCODE TELEPHONE
NO.
Lochgilphead Joint Campus   Jay Helbert Head Teacher Lochgilphead Joint
Campus
Lochgilphead Joint
Campus,
Kilmory,
Lochgilphead
PA31 8AA 01546 602598
3 - 18 SCHOOLS     
ESTABLISHMENT NAME NAME TITLE ADDRESS POSTCODE TELEPHONE
NO.
Tarbert Academy Neil McKnight Head Teacher Tarbert Academy
School Road,
Tarbert,
Argyll
PA29 6TE 01880 820269
Tarbert Academy (Primary) Neil McKnight Head Teacher  Tarbert Academy
(Primary)
School Road,
Tarbert, Argyll
PA29 6TE 01880 820269
Page 89

Page 90

18 
Page 90

Page 91

1 
ARGYLL AND BUTE COUNCIL MID-ARGYLL, KINTYRE AND
THE ISLANDS AREA
COMMITTEE 
CUSTOMER SUPPORT SERVICES   7 JUNE 2023 
AREA PERFORMANCE REPORT – FQ4 2022/23 
1 Background 
1.1 This paper presents the Area Performance Report for Financial Quarter 4 2022/23
(January to March 2023) and illustrates the agreed performance measures. 
1.2 The features of the Performance Report are as follows:- 
 Indicators are grouped by Corporate Outcome.
 The data table for each indicator is coded to identify the level of reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white 
 Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and three previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the responsible officer.
o Where possible performance is presented at both Area and Council
level. 
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee. 
1.4 To improve the response to performance queries, it is requested that either the
Responsible Named Officer or Sonya Thomas are contacted once the Quarterly
Performance Report is received with any queries. This should enable some
queries being resolved or clarified prior to the Area Committee meeting, and
therefore being carried forward as Actions at a subsequent meeting.   
2 Recommendations 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented. 
Page 91 Agenda Item 10

Page 92

2 
b) Upon receipt of the Quarterly Performance Report the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any
queries. 
c) Note that work is ongoing and to respond to Sonya Thomas with requests
or comments regarding the layout and format of the Performance Report. 
3.0 IMPLICATIONS 
3.1 Policy: None
3.2 Financial: None
3.3 Legal: None
3.4 HR: None
3.5 Fairer Scotland Duty: No impact assessment required for this report. 
3.5.1 Equalities: None. If requested the Area Committee Performance Report
can be supplied in a different format.
3.5.2 Socio-economic Duty: None
3.5.3 Islands: None 
3.6 Climate Change: None
3.7 Risk: None
3.8 Customer Service: None 
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Head of Customer Support Services
4 May 2023 
For further information, please contact:
Sonya Thomas
Organisation Development Officer - Performance and Improvement
Customer Support Services
01546 604454 
Appendix 1: FQ4 2022/23 MAKI Performance Report 
Page 92

Page 93

Appendix 1
Page 1 
Performance Reporting
Performance Reporting .............................................................................................................................................................................................................................. 1
All Areas .................................................................................................................................................................................................................................................. 4
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 5
COI – Maximise distribution of Scottish Welfare Fund ................................................................................................................................................................. 5
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 6
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention ...................... 6
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 7
Number of parking penalty notices issued – Mid Argyll, Kintyre and Islay .................................................................................................................................. 7
Number of parking penalty notices issued – Argyll and Bute ....................................................................................................................................................... 7
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 8
Car parking income to date – Mid Argyll, Kintyre and Islay .......................................................................................................................................................... 8
Car parking income to date – Argyll and Bute ............................................................................................................................................................................... 9
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................. 10
Dog fouling – total number of complaints – Mid Argyll, Kintyre and Islay ................................................................................................................................. 10
Dog fouling – total number of complaints – Argyll and Bute ...................................................................................................................................................... 10
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 11
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place .... 11
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 12
COI – Provide quality meals with cost margins to all pupils ....................................................................................................................................................... 12
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all .......................................................................................................... 13
Maximise the percentage of 16-19 years olds participating in education, training or employment – Mid Argyll, Kintyre and Islay ...................................... 13
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute ................ 13
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 14
Number of affordable social sector new builds completed per annum – Mid Argyll, Kintyre and Islay ................................................................................... 14
Page 93

Page 94

Appendix 1
Page 2 
Number of affordable social sector new builds completed per annum – Argyll and Bute ........................................................................................................ 14
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 15
Percentage of pre-planning application enquiries processed within 20 working days – Mid Argyll, Kintyre and Islay ........................................................... 15
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute ................................................................................ 15
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 16
Householder planning applications – average number of weeks to determine – Mid Argyll, Kintyre and Islay ...................................................................... 16
Householder planning applications – average number of weeks to determine – Argyll and Bute ........................................................................................... 16
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 18
COI – The number of new homeless applicants who required temporary accommodation this period .................................................................................. 18
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 19
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal .................................................... 19
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 20
COI – Increase the number of community benefits that are delivered through contracts we award locally ........................................................................... 20
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 21
Street lighting – percentage of faults repaired within 10 days – Mid Argyll, Kintyre and Islay ................................................................................................. 21
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute .......................................................................................... 21
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 22
Total number of complaints regarding waste collection – Mid Argyll, Kintyre and Islay .......................................................................................................... 22
Total number of complaints regarding waste collection – Argyll and Bute ............................................................................................................................... 22
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 23
COI – Percentage of waste recycled, composted and recovered ................................................................................................................................................ 23
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered ........................................................................................................... 23
Islands – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 24
H&L – Percentage of waste recycled, composted and recovered ............................................................................................................................................... 25
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 26
Page 94

Page 95

Appendix 1
Page 3 
COI – The number of tonnes of waste sent to landfill ................................................................................................................................................................. 26
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 27
LEAMS (Local Environment Audit and Management System) – Mid Argyll................................................................................................................................ 27
LEAMS (Local Environment Audit and Management System) – Kintyre ..................................................................................................................................... 27
LEAMS (Local Environment Audit and Management System) – Islay ......................................................................................................................................... 28
LEAMS (Local Environment Audit and Management System) – Argyll and Bute ....................................................................................................................... 28
Making It Happen.............................................................................................................................................................................................................................. 29
Teacher sickness absence – Mid Argyll, Kintyre and Islay ........................................................................................................................................................... 29
Teacher sickness absence – Argyll and Bute ................................................................................................................................................................................ 29
Making It Happen.............................................................................................................................................................................................................................. 30
LGE staff (non-teacher) sickness absence – Mid Argyll, Kintyre and Islay .................................................................................................................................. 30
LGE staff (non-teacher) sickness absence – Argyll and Bute ....................................................................................................................................................... 30
Making It Happen.............................................................................................................................................................................................................................. 31
COI – Increase the percentage of all self-service automated contacts ....................................................................................................................................... 31 
Page 95

Page 96

Appendix 1
Page 4 
All Areas 
FQ4 2022/23 Overall Performance Summary 
The information presented is a summary of the agreed measures. 
Unless stated otherwise, performance is presented at both Area and Council-wide levels. 
The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend. 
The data table for each indicator is colour coded to identify the level of reporting: 
 Area level measures are blue.
 Council level measures are grey.
 Corporate Outcome Indicators (COIs) are white. 
Where appropriate a Trend Line has been added to illustrate movement in ‘Actual’ over the reporting period.  Page 96

Page 97

Appendix 1
Page 5 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Maximise distribution of Scottish Welfare Fund 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2022/23 95.3% 87.5% Red
FQ2 2022/23 95.3% 115.1% Green
FQ3 2022/23 95.3% 129.2% Green
FQ4 2022/23 95.3% 144.0% Green 
Performance in FQ4 has exceeded target and actual has increased since the last reporting period. 
FQ4 Comment 
At 31 March 2023 our total Scottish Welfare Fund (SWF) spend is £659,812.  Our 2022/23 allocation was £458,338 so this represents an overspend of £201,474.  
However the Council has earmarked reserves from the previous years’ Covid related underspend to offset this.
Responsible person: Fergus Walker 
Page 97

Page 98

Appendix 1
Page 6 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and
intervention 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2022/23 100% 100% Green
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 95% Red 
This indicator for FQ4 is below the target and performance has decreased since the last reporting period. 
FQ4 Comment
There were no Debt Arrangement Schemes set up in this quarter.  All of the clients provided with a Personal Debt Recovery Action Plan were satisfied.  Out of 13
surveys issued 9 were returned showing 95% of clients satisfied.  2 of the 9 survey returns had comments showing their appreciation of the service and how it had
helped them.
Responsible person: Lee Roberts 
Page 98

Page 99

Appendix 1
Page 7 
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No target 44 No target 
FQ2 2022/23 No target 64 No target
FQ3 2022/23 No target 8 No target
FQ4 2022/23 No target 36 No target 
The indicator for FQ4 shows the number of parking penalty notices has increased since the last reporting period. 
FQ4 Comment
Inveraray car parks free until April.
Responsible person: Hugh O’Neill 
Number of parking penalty notices issued – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No target 2,043 No target 
FQ2 2022/23 No target 2,124 No target
FQ3 2022/23 No target 1,343 No target
FQ4 2022/23 No target 1,332 No target 
This indicator for FQ4 shows the number of parking penalty notices has decreased slightly since the last reporting period. 
FQ4 Comment
Seasonal car parks remain free, various signing and lining issues throughout region.
Responsible person: Hugh O’Neill 
Page 99

Page 100

Appendix 1
Page 8 
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Mid Argyll, Kintyre and Islay 
Performance is presented cumulatively for both Area and Council-wide levels.  For individual car parks, the income is presented on a quarterly basis. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ1 2022/23 £16,057 £15,541 Red
FQ2 2022/23 £40,065 £39,813 Red
FQ3 2022/23 £52,075 £61,366 Green
FQ4 2022/23 £63,673 £66,911 Green 
This indicator for FQ4 shows the cumulative amount of income collected has exceeded the cumulative target.  There is no performance trend as this data is
cumulative. 
FQ4 Comment
The end of FQ4 show that the off-street parking income has generated an additional £3,238 over anticipated income.  Officers are unable to provide a definitive
reason for the income over the anticipated budget.  The upgrade of the remaining cash only parking meters (across the whole Council area) is due to start in
May/June 2023; this will provide multi-payment options and may deliver an increase in ticket income.
Responsible person: Hugh O’Neill 
Actual quarterly income collected in Mid Argyll, Kintyre and Islay during FQ3 and FQ4. 
Car Park Location FQ3 Actual FQ4 Actual
Fisher Row, Inveraray £3,597 £1,006
The Avenue, Inveraray £9,355 £2,637
Front Street and Toilets, Inveraray £8,601 £1,894
Lorne Street, Lochgilphead £0 £9
MAKI £0 £0 
Page 100

Page 101

Appendix 1
Page 9 
Car parking income to date – Argyll and Bute 
Performance is presented cumulatively for both Area and Council-wide levels. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ1 2022/23 £250,661 £165,678 Red
FQ2 2022/23 £625,430 £491,453 Red
FQ3 2022/23 £812,919 £709,585 Red
FQ4 2022/23 £993,968 £817,788 Red 
This indicator for FQ4 shows the cumulative amount of income collected is significantly lower than the cumulative target.  There is no performance trend as this
data is cumulative. 
FQ4 Comment 
Improved income in both MAKI and OLI areas but overall there is an under-recovery in income of £176,180.  It is difficult to ascertain the exact reasons for under-
recovery in parking income however it can be affected by such things as events, weather and commuting.  The upgrade of the remaining cash only parking meters
(across the whole Council area) is due to start in May/June 2023; this will provide multi-payment options at all (RIS) on and off street parking facilities and may
deliver an increase in ticket income.
Responsible person: Hugh O’Neill 
Page 101

Page 102

Appendix 1
Page 10 
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 26 No Target 
FQ2 2022/23 No Target 19 No Target
FQ3 2022/23 No Target 15 No Target
FQ4 2022/23 No Target 26 No Target 
This indicator for FQ4 shows the number of dog fouling complaints has increased since the last reporting period. 
FQ4 Comment
The number of dog fouling complaints has risen this quarter with 10 complaints received in Mid Argyll, 16 in Kintyre and nil in Islay.  The Warden service will
continue to patrol and liaise with partners in an effort to educate and resolve this issue.
Responsible person: Tom Murphy 
Dog fouling – total number of complaints – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 61 No Target 
FQ2 2022/23 No Target 45 No Target
FQ3 2022/23 No Target 47 No Target
FQ4 2022/23 No Target 77 No Target 
This indicator for FQ4 shows the number of dog fouling complaints has increased significantly since the last reporting period. 
FQ4 Comment
The number of dog fouling complaints received this quarter is high with a total of 77; B&C: 25, H&L: 8, MAKI: 26 and OLI: 18.  The Warden service will continue to
monitor and liaise with partners in a bid to educate and reduce the numbers.
Responsible person: Tom Murphy 
Page 102

Page 103

Appendix 1
Page 11 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring
plans in place 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2022/23 100% 100% Green
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 100% Green 
This indicator for FQ4 is on track with no change in performance since the last reporting period. 
FQ4 Comment
There is individual tracking and monitoring in place on SEEMIS in schools for care experienced children and young people.  In addition to this, the Principal Teacher
for care experienced children and young people monitors the information in SEEMIS and has subsequent conversations with staff in schools to ensure care
experienced children and young people are receiving all the support they need to achieve and that the staff in school have the right strategies in place to help the
child remain engaged with their education attainment and achievement.  Often the care experienced health and wellbeing officers are used to provide extra
support for the child and the family.  The new Virtual Head Teacher post started on 17th April 2023.
Responsible person: Louise Lawson 
Page 103

Page 104

Appendix 1
Page 12 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Provide quality meals with cost margins to all pupils 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 +/-5.00% 3.77% Green 
FQ2 2022/23 +/-5.00% 0.98% Green
FQ3 2022/23 +/-5.00% 6.09% Red
FQ4 2022/23 +/-5.00% -2.56% Green 
This indicator for FQ4 is within the +/-5% target variance and performance has improved since the last reporting period. 
FQ4 Comment
Total percentage variance for Argyll and Bute -2.56%.  We will continue to monitor any locations continuing to have food cost percentages over this target.
B&C -6.15%
H&L -2.00%
MAKI -2.00%
OLI -0.80%
Responsible person: Jayne Jones 
Page 104

Page 105

Appendix 1
Page 13 
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 94.00% 95.45% Green 
FQ2 2022/23 94.00% 96.72% Green
FQ3 2022/23 94.00% 94.30% Green
FQ4 2022/23 94.00% 94.70% Green 
This indicator for FQ4 is above target and performance has increased slightly since the last reporting period. 
FQ4 Comment
As of 20/03/2023, the participation figure for MAKI was 921 pupils which equates to 94.7%.  This is 0.8% above the Argyll and Bute Participation figure for 2021/22
of 93.9%.
Responsible person: Simon Easton 
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and
Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 94.00% 94.00% Green 
FQ2 2022/23 94.00% 93.90% Red
FQ3 2022/23 94.00% 93.90% Red
FQ4 2022/23 94.00% 93.62% Red 
This indicator for FQ4 is slightly below target and performance has decreased slightly since the last reporting period. 
FQ4 Comment
The Annual Participation Measure for 2021/22 was released on 31/08/2022 which showed 93.9% of young people aged 16-19 were participating (in work, training
or education).  This figure is 0.4% above the national average. 3.8% were not participating, which is 0.2% below the national average. 2.3% were unconfirmed,
which is 1.3% below the national average.  As at 20/03/2023, the Participation figure for Argyll and Bute stood at 3,640 pupils which equates to 93.62%.
Responsible person: Simon Easton
Page 105

Page 106

Appendix 1
Page 14 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Number of affordable social sector new builds completed per annum – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status
FQ1 2022/23 18 18 Green
FQ2 2022/23 10 10 Green
FQ3 2022/23 1 1 Green
FQ4 2022/23 4 4 Green 
This indicator for FQ4 shows the number of completions has met the target for the reporting period. 
FQ4 Comment
Argyll Community Housing Association Development at Oakhill Tarbert; 4 General Needs (made up of 4 x 3 bed houses).  All for social rent.
Responsible person: Allan Brandie 
Number of affordable social sector new builds completed per annum – Argyll and Bute 
Reporting Period Target Actual Status
FQ1 2022/23 36 36 Green
FQ2 2022/23 48 48 Green
FQ3 2022/23 37 37 Green
FQ4 2022/23 67 67 Green 
This indicator for FQ4 shows the number of completions has met the target for the reporting period. 
FQ4 Comment
B&C No units were scheduled for completion in FQ4.
H&L Loretto Housing Association (Wheatley Group) Development at Sawmill Field; 32 General Needs and 4 Amenity (made up of 8 x 1 bed Flats, 12 x 2 bed
Flats, 10 x 2 bed Houses, 6 x 3 bed Houses).  All for social rent.
MAKI Argyll Community Housing Association Development at Oakhill Tarbert; 4 General Needs (made up of 4 x 3 bed houses).  All for social rent.
OLI Link Group Development at Dunbeg Phase 3; 23 General Needs (made up of 7 x 2 bed Terraced Houses, 15 x 3 bed Semi Detached/Terraced Houses, 1 x 4
bed End Terrace House) and 4 wheelchair accessible (4 x 2 bed Wheelchair Bungalows).  All for social rent.
Responsible person: Alan Brandie
Page 106

Page 107

Appendix 1
Page 15 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2021/22 75.0% 31.6% Red 
FQ2 2021/22 75.0% 35.0% Red
FQ3 2022/23 75.0% 36.0% Red
FQ4 2022/23 75.0% 30.6% Red 
This indicator for FQ4 is below target and performance has decreased since the last reporting period. 
FQ4 Comment
Performance across Development Management remains impacted by extended periods of operating with staff vacancies and a backlog of casework from the
pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government has further impacted on productivity as the
Development Management staff interpret this new policy landscape and its implications for current applications and enquiries.
Responsible person: Peter Bain 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 75.0% 60.5% Red 
FQ2 2022/23 75.0% 64.7% Red
FQ3 2022/23 75.0% 52.5% Red
FQ4 2022/23 75.0% 55.4% Red 
This indicator for FQ4 is below target however performance has increased since the last reporting period. 
FQ4 Comment
Performance across Development Management remains impacted by extended periods of operating with staff vacancies and a backlog of casework from the
pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government has further impacted on productivity as the
Development Management staff interpret this new policy landscape and its implications for current applications and enquiries.
Responsible person: Peter Bain
Page 107

Page 108

Appendix 1
Page 16 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 8.0 weeks 15.3 weeks Red 
FQ2 2022/23 8.0 weeks 18.8 weeks Red
FQ3 2022/23 8.0 weeks 15.3 weeks Red
FQ4 2022/23 8.0 weeks 16.2 weeks Red 
This indicator for FQ4 has not met the target and performance has decreased since the last reporting period. 
FQ4 Comment
This measure only relates to planning applications received for alterations to existing premises.
Performance across Development Management remains impacted by extended periods of operating with staff vacancies and a backlog of casework from the
pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government has further impacted on productivity as the
Development Management staff interpret this new policy landscape and its implications for current applications and enquiries.
Responsible person: Peter Bain 
Householder planning applications – average number of weeks to determine – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 8.0 weeks 12.4 weeks Red 
FQ2 2022/23 8.0 weeks 13.1 weeks Red
FQ3 2022/23 8.0 weeks 12.0 weeks Red
FQ4 2022/23 8.0 weeks 17.3 weeks Red 
This indicator for FQ4 has not met the target and performance has decreased significantly since the last reporting period. 
FQ4 Comment
This measure only relates to planning applications received for alterations to existing premises.
Page 108

Page 109

Appendix 1
Page 17 
Performance across Development Management remains impacted by extended periods of operating with staff vacancies and a backlog of casework from the
pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government has further impacted on productivity as the
Development Management staff interpret this new policy landscape and its implications for current applications and enquiries.
Responsible person: Peter Bain 
Benchmarking
The year-end statistics from The Scottish Government were published on 31st August. FY21/22 benchmarking figures have now been updated and FY22/23 have
been forward projected in the usual way.  Readers should note that our own Pyramid data in Development Management measures is "unadjusted", whereas that
of the benchmarks (represented by the blue and green columns on the graph) is adjusted for "clock-stopping".  Clock-stopping is where The Scottish Government
allow for the removal of specific time periods for identified applications where delays were out with the control of the Local Planning Authority. 
Page 109

Page 110

Appendix 1
Page 18 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – The number of new homeless applicants who required temporary accommodation this period 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 32 No Target 
FQ2 2022/23 No Target 28 No Target
FQ3 2022/23 No Target 41 No Target
FQ4 2022/23 No Target 30 No Target 
This indicator for FQ4 shows the number of applicants has decreased since the last reporting period. 
FQ4 Comment
During FQ4, the housing service provided temporary accommodation for 30 new homeless households.
B&C 9
H&L 4
MAKI 1
OLI 16
Responsible Person: Morven Macintyre 
Page 110

Page 111

Appendix 1
Page 19 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 20.0% 13.2% Red 
FQ2 2022/23 20.0% 22.2% Green
FQ3 2022/23 20.0% 19.4% Red
FQ4 2022/23 20.0% 22.5% Green 
This indicator for FQ4 is above target and performance has increased since the last reporting period. 
FQ4 Comment
Of the 9 bids made by local contractors, 9 were awarded the contract with a total value of over £883k.  A summary of all contracts awarded in FQ4 is available. 
The Procurement, Commercial and Contract Management Team (PCCMT) continue to support local suppliers by providing useful information on the Council’s
website i.e. pre-recorded webinars on how to bid for Council contracts, hints and tips for tendering as well as our contract plan, details of upcoming supplier
development events and our category officer’s contact details all of which enable local suppliers to be able to bid for our contracts.
Responsible person: Anne MacColl-Smith 
Page 111

Page 112

Appendix 1
Page 20 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Increase the number of community benefits that are delivered through contracts we award locally 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2022/23 No Target - No Target
FQ2 2022/23 No Target 30 No Target
FQ3 2022/23 No Target - No Target
FQ4 2022/23 No Target 43 No Target 
This indicator for FQ4 shows the number of community benefits has increased since the last reporting period. 
FQ4 Comment
This indicator is reported in FQ2 and FQ4.
The Procurement, Commercial and Contract Management Team (PCCMT) has been working closely with their suppliers to deliver additional social, economic and
environmental value and achieved 43 community benefits through Contract Management, Contract Awards and the Request List from 1st October 2022 to 31st
March 2023.  Further details are available.
Responsible person: Anne MacColl-Smith 
Page 112

Page 113

Appendix 1
Page 21 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 75% 33% Red 
FQ2 2022/23 75% 47% Red
FQ3 2022/23 75% 44% Red
FQ4 2022/23 75% 28% Red 
This indicator for FQ4 is below target and performance has decreased significantly since the last reporting period. 
FQ4 Comment
A total of 78 jobs were completed and signed off in FQ4, including 16 on Islay. This is a drop in overall numbers from the 106 jobs in FQ3.  This is partly due to the
geographical coverage of the Lochgilphead based electrician, also covering Lorn and Mull. Of the 78 MAKI jobs completed, 22 were signed off within the 10 day
indicator time frame, giving a performance of 28%, down from 44% in FQ3.
Responsible person: Tom Murphy 
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 75% 29% Red 
FQ2 2022/23 75% 48% Red
FQ3 2022/23 75% 30% Red
FQ4 2022/23 75% 32% Red 
This indicator for FQ4 is below target however performance has increased slightly since the last reporting period. 
FQ4 Comment
The total number of Street Lighting jobs completed in FQ4 was 393, similar (up 10) to the throughput of instructions in FQ3.  Of this total number of completed
jobs, 125 were completed within the 10 day timescale for dark lamps, giving a performance of 32%, again a slight increase of 2% on the performance in FQ3. 
Similar to FQ3, more jobs were completed and closed off than new ones raised, 393 vs 280, which has resulted in a continued reduction in the repairs backlog.
Responsible person: Tom Murphy
Page 113

Page 114

Appendix 1
Page 22 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Total number of complaints regarding waste collection – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 3 No Target 
FQ2 2022/23 No Target 8 No Target
FQ3 2022/23 No Target 2 No Target
FQ4 2022/23 No Target 6 No Target 
This indicator for FQ4 shows the number of waste collection complaints has increased since the last reporting period. 
FQ4 Comment
There were only 6 waste collection complaints received for the fourth quarter for the Maki area, given the number of properties serviced this is a very good level
of service.
Responsible person: Tom Murphy 
Total number of complaints regarding waste collection – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 58 No Target 
FQ2 2022/23 No Target 65 No Target
FQ3 2022/23 No Target 35 No Target
FQ4 2022/23 No Target 53 No Target 
This indicator for FQ4 shows the number of waste collection complaints has increased since the last reporting period. 
FQ4 Comment
There were a total of 53 waste collection complaints received this quarter, although this may seem high, given the number of properties serviced and the
operational difficulties and staffing issues this is still a good level of service.
Responsible person: Tom Murphy 
Page 114

Page 115

Appendix 1
Page 23 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 45.0% 52.1% Green 
FQ2 2022/23 45.0% 50.5% Green
FQ3 2022/23 45.0% 56.7% Green
FQ4 2022/23 45.0% 52.0% Green 
This indicator for FQ4 is above target however performance has decreased since the last reporting period. 
FQ4 Comment
52% recycling/composting and recovery (40.7% recycling/composting and 11.3% recovery) in Q4.  Overall 22/23 f/year rates are 52.6% recycling/composting and
recovery (39.2% recycling/composting plus 13.4% recovery).  Recovery is higher than normal in PPP area due to a trial by Renewi (formerly Shanks), who have
taken some residual general waste for disposal mainly from their Dalinlongart (by Dunoon) waste facility to an energy from waste (EFW) plant near Edinburgh. 
Recycling and composting in PPP area has also been higher mainly due to Renewi sending stockpiled wood waste for onward recycling and green garden waste for
onward composting.  These have both helped offset the reduction in recycling and recovery from the Helensburgh and Lomond area following on from The
Scottish Government Landfill Tax Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental no longer carry out any recycling or
recovery from mixed residual general waste.
Responsible person: John Blake 
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 54.4% No Target 
FQ2 2022/23 No Target 58.1% No Target
FQ3 2022/23 No Target 67.4% No Target
FQ4 2022/23 No Target 61.9% No Target
Page 115

Page 116

Appendix 1
Page 24 
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ4 Comment
61.9% recycling/composting and recovery (44.2% recycling/composting and 17.7% recovery) in Q4.  22/23 f/year rates in PPP area are 60.4% recycling/composting
and recovery (39.7% recycling/composting plus 20.7% recovery).  Recovery is higher than normal in PPP area due to a trial by Renewi (formerly Shanks), who have
taken some residual general waste for disposal mainly from their Dalinlongart (by Dunoon) waste facility to an energy from waste (EFW) plant near Edinburgh. 
Recycling and composting in PPP area has also been higher mainly due to Renewi sending stockpiled wood waste for onward recycling and green garden waste for
onward composting.
Responsible person: John Blake 
Islands – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 33.3% No Target 
FQ2 2022/23 No Target 34.7% No Target
FQ3 2022/23 No Target 43.5% No Target
FQ4 2022/23 No Target 35.9% No Target 
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ4 Comment
35.9% recycling/composting and recovery (35.9% recycling/composting and 0% recovery).  22/23 f/year rates are 36.8% recycling/composting and recovery (36.5%
recycling and recovery and 0.3% recovery) which is similar to previous year.
Responsible person: John Blake 
Page 116

Page 117

Appendix 1
Page 25 
H&L – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 53.6% No Target 
FQ2 2022/23 No Target 41.0% No Target
FQ3 2022/23 No Target 37.5% No Target
FQ4 2022/23 No Target 34.5% No Target 
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ4 Comment
34.5% recycling/composting and recovery (34.3% recycling/composting and 0.2% recovery) in Q4. 22/23 f/year rates in Helensburgh and Lomond area are 41.3%
recycling/composting and recovery (39.1% recycling/composting plus 2.2% recovery).  There has been a reduction in recycling and recovery from the Helensburgh
and Lomond area following on from The Scottish Government Landfill Tax Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental
no longer carry out any recycling or recovery from mixed residual general waste.
Responsible person: John Blake 
Page 117

Page 118

Appendix 1
Page 26 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – The number of tonnes of waste sent to landfill 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 5,850 4,546 Green 
FQ2 2022/23 5,550 4,947 Green
FQ3 2022/23 5,100 3,882 Green
FQ4 2022/23 5,000 4,610 Green 
This indicator for FQ4 is below target (lowest is best) and performance has decreased since the last reporting period. 
FQ4 Comment
Landfill tonnages within limits in Q4 and f/year.  Main reason for slight reduction in landfill during year is due to a trial by Renewi (formerly Shanks), who have
taken some residual general waste for disposal mainly from their Dalinlongart (by Dunoon) waste facility to an energy from waste (EFW) plant near Edinburgh. 
This has helped offset the reduction in recycling and recovery from the Helensburgh and Lomond area following on from The Scottish Government Landfill Tax
Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental no longer carry out any recycling or recovery from mixed residual general
waste.
Responsible person: John Blake 
Page 118

Page 119

Appendix 1
Page 27 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
LEAMS (Local Environment Audit and Management System) – Mid Argyll
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 73 88 Green 
FQ2 2022/23 73 82 Green
FQ3 2022/23 73 82 Green
FQ4 2022/23 73 83 Green 
This indicator for FQ4 is above target however performance has increased slightly since the last reporting period. 
FQ4 Comment
The level of street cleanliness in the Mid Argyll area for the fourth quarter is very good with January 83, February 75 and March 91, all months exceeding the
National Standard and Benchmark Figure.
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Kintyre
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 73 82 Green 
FQ2 2022/23 73 81 Green
FQ3 2022/23 73 81 Green
FQ4 2022/23 73 81 Green 
This indicator for FQ4 is above target with no change in performance since the last reporting period. 
FQ4 Comment
Again this quarter the street cleanliness for the Kintyre area remains very good, January 78, February 84 and March 82.
Responsible person: Tom Murphy 
Page 119

Page 120

Appendix 1
Page 28 
LEAMS (Local Environment Audit and Management System) – Islay
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 73 84 Green 
FQ2 2022/23 73 84 Green
FQ3 2022/23 73 84 Green
FQ4 2022/23 73 81 Green 
This indicator for FQ4 is above target however performance has decreased slightly since the last reporting period. 
FQ4 Comment
The level of street cleanliness for the fourth quarter in Islay remains steady, exceeding both the National Standard and Benchmark Figures.
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Argyll and Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 73 85 Green 
FQ2 2022/23 73 82 Green
FQ3 2022/23 73 83 Green
FQ4 2022/23 73 83 Green 
This indicator for FQ4 is above target with no change in performance since the last reporting period. 
FQ4 Comment
Again this quarter the level of street cleanliness for the whole are remains very high.  The role of the Amenity Warden has a key influence around littering to assist
in maintaining the good level of performance.
Responsible person: Tom Murphy 
Page 120

Page 121

Appendix 1
Page 29 
Making It Happen 
Teacher sickness absence – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 1.62 days No Target 
FQ2 2022/23 No Target 1.26 days No Target
FQ3 2022/23 No Target 1.80 days No Target
FQ4 2022/23 No Target 2.23 days No Target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
Teacher absence has increased by half a day on the same quarter last year and just under half a day based on the previous quarter.  The biggest reason for
absence is stress and that has seen almost a 50% increase on the previous quarter.
Responsible person: Simon Easton 
Teacher sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 1.79 days No Target 
FQ2 2022/23 No Target 1.22 days No Target
FQ3 2022/23 No Target 1.70 days No Target
FQ4 2022/23 No Target 2.48 days No Target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
Overall teacher absence has increased by almost 3/4 of a day on the same quarter last year and by 3/4 of a day on the previous quarter.  The top reason for
absence is infections, followed by stress and then medical treatment.
Responsible person: Simon Easton 
Page 121

Page 122

Appendix 1
Page 30 
Making It Happen 
LGE staff (non-teacher) sickness absence – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 2.87 days No Target 
FQ2 2022/23 No Target 3.16 days No Target
FQ3 2022/23 No Target 3.08 days No Target
FQ4 2022/23 No Target 3.58 days No Target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
LGE absence has increased by 3/4 of a day on the same quarter last year and 1/2 a day on the previous quarter.  The biggest reason for absence is stress and that
has seen a 51% increase on the previous quarter.
Responsible person: Carolyn Cairns 
LGE staff (non-teacher) sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 3.57 days No Target 
FQ2 2022/23 No Target 3.66 days No Target
FQ3 2022/23 No Target 3.65 days No Target
FQ4 2022/23 No Target 4.04 days No Target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
Overall LGE absence has increased by just over half a day on the same quarter last year and just under half a day on the previous quarter.  The top three reasons
for absence are stress, infections and other musculoskeletal reasons.
Responsible person: Carolyn Cairns
Page 122

Page 123

Appendix 1
Page 31 
Making It Happen 
COI – Increase the percentage of all self-service automated contacts 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 70.0% 79.4% Green 
FQ2 2022/23 70.0% 75.4% Green
FQ3 2022/23 70.0% 72.5% Green
FQ4 2022/23 70.0% 72.2% Green 
This indicator for FQ4 is above target however performance has decreased slightly since the last reporting period. 
FQ4 Comment
In FQ4 there were 36,799 transactions dealt with by customer service agents (27.8%) and 95,336 automated or self-service transaction (72.2%) so the 70% target
was exceeded.  FQ4 2021/22 2022/23 Mediated 42,712 38,657 Automated 104,938 104,572.
Responsible person: Robert Miller 
Page 123

Page 124

This page is intentionally left blank

Page 125

ARGYLL AND BUTE COUNCIL  MID ARGYLL, KINTYRE AND THE 
ISLANDS AREA COMMITTEE 
ROADS AND INFRASTRUCTURE
SERVICES 
JUNE 2023 
CEMETERY MAINTENANCE AND PROVISION 
1.0 INTRODUCTION 
1.1 This is a follow up report to a Cemetery Asset report considered by the
Environment, Development and Infrastructure Committee in March this year
which can be viewed here (item 8): Agenda for Environment, Development and
Infrastructure Committee on Thursday, 2 March 2023, 10:30 am - Argyll and
Bute Council (argyll-bute.gov.uk) 
1.2 This covering report highlights the relevant information for the Mid Argyll, Kintyre
and the Islands Area Committee. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Area Committee endorse the content of this report.   
3.0 DETAIL 
3.1 The Environment, Development and Infrastructure Committee report provides
comprehensive information regarding cemetery provision across the whole
council area. The summary table below details lairs which are closed, active and
those with less than 5 years capacity in the Mid Argyll, Kintyre and the Islands
area. 
CEMETERY SITES  - SALE OF LAIRS STATUS  - February 
2023 review      
District "Closed" ACTIVE 
Less than
5yrs  
No Lairs for
sale
Lairs
available
sales
remaining
Mid-Argyll 17 6 none
Kintyre 7 7 none
& Islands 9 8 none  
33 21    
"Closed" ACTIVE  
Page 125 Agenda Item 11

Page 126

3.2 There was previously issues with capacity at Kilkerran Cemetery reported in the
2019 EDI update paper. Due to revised counting, which is now based on the
previous year’s lairs sold and the fact that we have introduced a stop on pre-sale
of lairs at Kilkerran, we now have capacity of just over 7 years. However, work
carried out to try and find a solution to expand or identify another area for a
cemetery in Campbeltown has proven very challenging and time consuming due
to the ground issues as well as identification of other suitable sites. Officers are
still progressing with this. 
3.3 At the March EDI Committee, it was agreed that where cemeteries are reaching
capacity of available lairs that a restriction be placed on pre-sale of lairs in
cemeteries based on the annual current sale rate where there is less than 10
years of available land remaining. 
3.4  Annual monitoring of available lair numbers will be carried out with updates
being provided to Members, detailing numbers of lairs and cemetery capacity,
as noted at the Environment, Development and Infrastructure Committee in
March 2023.   
4.0 CONCLUSION 
4.1 This report provides the Mid Argyll, Kintyre and Islands Area Committee with
an update on cemetery provision. 
5.0 IMPLICATIONS 
5.1 Policy – Amended in line with Legislation and to allow proper management of
lairs. 
5.2 Financial – Capital funding will be required for the ongoing provision of
additional lair capacity. 
5.3 Legal – None known. 
5.4 HR – None known. 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – none known   
5.5.2   Socio-economic Duty – none known 
5.5.3 Islands – none known 
5.6    Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise 
Page 126

Page 127

5.7     Risk – burial ground capacity will be monitored on an annual basis to ensure
adequate planning can be put in place for ongoing burial provision. 
5.8    Customer Service – Development programme and asset management allows
Argyll and Bute Council to provide a local and area wide burial service. 
Executive Director with responsibility for Roads and Infrastructure: Kirsty
Flanagan 
Head of Roads and Infrastructure: Jim Smith 
Policy Lead for Roads and Infrastructure: Councillor Ross Moreland 
May 2023                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Service 
Page 127

Page 128

This page is intentionally left blank

Page 129

ARGYLL AND BUTE COUNCIL                                        MID ARGYLL, KINTYRE
AND THE ISLANDS AREA
COMMITTEE                                                                                                         
ROADS AND INFRASTRUCTURE                                   JUNE 2023
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 A Roads and Infrastructure standing report was a fixture on Area Committee
agendas throughout the life of the last Council. In the first two rounds of Area
Committee meetings in the new Council feedback was sought on the value of
these updates, and their format and frequency. Generally Members felt having a
standard item was beneficial and it was acknowledged that the Roads and
Infrastructure weekly briefings issued to all members each Friday afternoon
provide for the main sources of live information on current activities. On top of
these briefings there is a bank of resources on the new Member Zone system
which include the weekly briefings, subject specific briefings, ad hoc short
briefings on issues, relevant previous committee reports, operational service
procedures, legislation and Council policies. 
1.2 In the last Council the purpose of these reports was to provide an update on
service activities but since weekly briefings were introduced around 18 months
ago [at the time of writing this report we are on to briefing Edition 97] these have
largely superseded the original stated purpose of these reports. 
1.3 On the basis of the above this new format has been agreed through the
December 2022 round of area committees for this standing item. This format
removes duplication for Officers and rather links to existing published
information, with additional updates only in the body of the reports if these are
specifically requested/noted from previous meetings. The report remains as a
standing item and continues to provide the opportunity for Officer engagement at
the committee meetings.   
2.0 RECOMMENDATIONS 
It is recommended that the Area Committee: 
2.1 Note and consider the contents of this report. 
Page 129 Agenda Item 12

Page 130

3.0 DETAIL 
3.1 Roads and Infrastructure Services provides Members with weekly briefings on
topical service activities which are all available here.   
3.2 As part of the resources on the new Member Zone system there are various key
documents available in an online library here. 
4.0 CONCLUSION 
4.1 This report provides links to existing published information on service activities
and provides for the opportunity for Officer attendance and engagement at
committee meetings. 
5.0 IMPLICATIONS 
5.1 Policy – Roads and Infrastructure work to a number of policies across the range
of service areas 
5.2 Financial – revenue and capital budgets are in place to deliver projects and
cyclic work 
5.3  Legal – none known 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – where appropriate EqSEIAs will be
carried out to identify any implications 
5.5.2   Socio-economic Duty – where appropriate EqSEIAs will be carried out to
identify any implications 
5.5.3 Islands – where appropriate Island impacts assessments will be carried out to
identify any implications 
5.6. Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise 
5.7  Risk – risk managed through toolbox talks, safety briefings and where
appropriate risk registers – all of the above are monitored through the RIS
leadership and management teams 
5.8  Customer Service – none known 
Page 130

Page 131

Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
May 2023                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services; or Mark Calder, Project
Manager 
Page 131

Page 132

This page is intentionally left blank

Page 133

ARGYLL AND BUTE COUNCIL               MID ARGYLL, KINTYRE AND      
THE ISLANDS AREA COMMITTEE
CHIEF EXECUTIVE’S UNIT              07 JUNE 2023 
SUPPORTING COMMUNITIES FUND 2023/24 
1.0 EXECUTIVE SUMMARY  
1.1 The purpose of this report is to decide on the allocation of the Council’s Supporting
Communities Fund (SCF) for Mid Argyll, Kintyre and the Islands.
1.2 The total Supporting Communities Fund budget made available by the Council for
allocation in Mid Argyll, Kintyre and the Islands for distribution in 2023/24 is
£38,425.
1.3 It is recommended that 18 applicants are awarded funding.
1.4 Applicants awarded funds from the Council’s Supporting Communities Fund
have 18 months in which to spend the funds. 
Page 133 Agenda Item 13

Page 134

ARGYLL AND BUTE COUNCIL               MID ARGYLL, KINTYRE AND      
THE ISLANDS AREA COMMITTEE
CHIEF EXECUTIVE’S UNIT              07 JUNE 2023 
SUPPORTING COMMUNITIES FUND 2023/24 
2.0 INTRODUCTION 
2.1 The report details recommendations for the award of the Council’s Supporting
Communities Fund (SCF). The Supporting Communities Fund budget made
available by Council in Mid Argyll, Kintyre and the Islands for 2023/24 is
£22,500.  
2.2 The total available for allocation is £38,425 due to additional funding from the
Shared Prosperity Fund, funds to support resiliency in communities impacted by
Covid-19 and from the return of unspent funds from previous applicants.
2.3 Organisations applying to the fund were able to request up to £2,500.  The SCF
is popular and this year has attracted 49 applications from the Mid Argyll, Kintyre
and the Islands area, requesting a total of £111,313.83. 
2.4 Applications have been scored by the Council’s Community Development Team
against criteria set out in the guidance (https://www.argyll-bute.gov.uk/council-
and-government/third-sector-grants) and a summary of all applications is
appended to this report. 18 are recommended to be funded.  
3.0 RECOMMENDATIONS 
3.1 Members are asked to agree that the 18 applications, marked as ‘Award’ within
Appendix 1 are awarded funding from the Supporting Communities Fund totalling
£38,425. Detailed information about these projects is contained within Appendix 2. 
4.0 DETAIL 
4.1 The SCF is assessed through a robust process which involves financial checks
and Community Development Team contact with the applicant to verify any
information where required.  All applicants need to provide satisfactory essential
Page 134

Page 135

information on governance and finance to be eligible.  Scoring is based on a set
of criteria outlined in the guidance and made available on the council’s website:
(Guidance for applicants).  Applications to the fund must be for projects that come
under one or more of these categories:
 Fairer Communities – tackling poverty by sharing opportunities.   
 Resilient Communities – community capacity building/rebuilding and
repairing from a pandemic
 Greener, Cleaner Communities – environmental action to support
addressing climate change 
 Creative Communities – creativity for health and wellbeing  
4.2 Of the 49 applications received (requesting a total of £111,313.83), 5 were
withdrawn or ineligible and of the 44 eligible applications, 38 are either new
applicants to the fund or have not applied within the last two years. 
4.3 Of the eligible applications to the SCF, 18 are recommended to be awarded
funding, 4 of these are for island based projects.  The applications recommended
for funding are labelled as ‘Award’ in the recommendation column in Appendix 1.
The detail of the projects is in Appendix 2.    
4.4 The projects recommended will deliver a range of activities from swimming for
children with additional support needs, to cycling development projects and
community engagement consultations.
4.5 Unsuccessful applications are marked as ‘No award’ in Appendix 1.  These
applicants will be offered support from the Community Development Team and
provided with information on alternative sources of funding. 
4.6 This year the total of £38,425 available for allocation is comprised of:
 £22,500 from the Council’s Supporting Communities Fund.
 £7,500 from the Shared Prosperity Fund.  This is specifically to support
projects related to climate change. These funds are ring fenced to the
highest scoring projects under the ‘Greener, Cleaner Communities’
criteria.
 £5,000 of funding specifically for projects that support resiliency in
communities impacted by Covid-19.  These funds are ring fenced to the
highest scoring projects under the ‘Resilient Communities’ criteria.
 £3,425 of unspent funds were returned from projects for the financial
periods 2020/21 and 2021/22 due to the constraints during the pandemic.
4.7 Successful projects have to complete a report at the end to evidence the impact
of the spending of the money. The results of this are brought to Area Committee
in March 2025, if not before depending on project duration. 
5.0 CONCLUSION
Page 135

Page 136

5.1 The Supporting Communities Fund application and assessment process has
been completed as set out within its guidance (https://www.argyll-
bute.gov.uk/council-and-government/third-sector-grants ). 
5.2 The recommendations made fully allocate the funding available for financial year
2023/24.
5.3 The 18 projects being put forward for an award will help communities to deliver
priority activities in their area in 2023/24.
5.4  All applicants to the fund are supported throughout the process and beyond by
the Community Development Team. 
6.0 IMPLICATIONS
6.1 Policy: n/a
6.2 Financial: Recommendations in the report are limited to the budget allocation
available in 2023/24 for the Supporting Communities Fund in Mid Argyll, Kintyre
and the Islands.
6.3  Legal:  Applications are initially assessed to ensure that groups are constituted
with managed accounts.
6.4  HR: n/a 
6.5  Fairer Scotland Duty: The Supporting Communities Fund supports community
groups in tackling poverty, reducing inequality and building a fairer and more
inclusive Scotland. 
6.5.1   Equalities - protected characteristics: Applicants are given the options
of receiving the application in large print and other languages. 
6.5.2   Socio-economic Duty: None known 
6.5.3  Islands: 9 of the applicant projects are island based.  4 of these are
being recommended funding.
6.6 Climate Change: One of the four criteria within the process is specific to
mitigating climate change. 
6.7 Risk: risk to the public pound is managed through the assessment and scoring,
and through end of project monitoring process.
6.8  Customer Service: None 
Page 136

Page 137

Pippa Milne
Chief Executive 
Alastair Redman
Policy Lead Councillor 
12 May 2023                                                 
For further information contact: 
Kirsty McLuckie – Community Development Officer
Telephone: 01631 572192
Email: kirsty.mcluckie@argyll-bute.gov.uk 
Kirsty Moyes – Community Development Team Leader
Tel. 01436 657635 
Email. kirsty.moyes@argyll-bute.gov.uk 
APPENDICES
Appendix 1- Assessment Score and Recommendations
Appendix 2 – Project Summary Sheet
Page 137

Page 138

Appendix 1 – Assessment Score and Recommendations
Ref Applicant Recommendation
Assessment
Score
Value of
Project 
Amount
Requested 
Recommended
Award 2023/24 
Cumulative
Total 
1 *Bute Advice Centre - MAKI project Award 8.5 £3,500.00 £2,500.00 £2,500.00 £2,500.00
2 **Community Cycling Ardrishaig Award 8.3 £2,496.54 £2,496.54 £2,496.54 £4,996.54
3 South Kintyre Development Trust  Award 8.1 £12,050.00 £2,500.00 £2,500.00 £7,496.54
4 Templar Arts & Leisure Centre Award 7.9 £3,600.00 £2,500.00 £2,500.00 £9,996.54
5 Kintyre Sea Sports Campbeltown Regatta Award 7.8 £724.00 £500.00 £500.00 £10,496.54
6 **Kintyre Recycling Limited - Bike Project Award 7.8 £2,000.00 £2,000.00 £2,000.00 £12,496.54
7 **Isle of Gigha Heritage Trust Award 7.7 £2,513.00 £1,973.00 £1,973.00 £14,469.54
8 Islay Community Council  Award 7.7 £2,500.00 £2,500.00 £2,500.00 £16,969.54
9 *Islay & Jura Community Enterprise  Award 7.4 £12,340.00 £2,500.00 £2,500.00 £19,469.54
10 KADAS (Kintyre Alcohol and Drugs Advisory Service Award 7.2 £2,500.00 £2,500.00 £2,500.00 £21,969.54
11 Mid Argyll Community Enterprise Ltd (MACPOOL) Award 7.1 £4,800.00 £2,400.00 £2,400.00 £24,369.54
12
Campbeltown and District Juvenile Football
Association Award  6.9  £2,390.00  £2,390.00  £2,390.00 £26,759.54
13 Inspire Inveraray  Award 6.9 £2,500.00 £2,500.00 £2,500.00 £29,259.54
14 Ardrishaig KGV Community Park Association Award 6.8 £2,500.00 £2,500.00 £2,500.00 £31,759.54
15 Campbeltown Brass Band  Award 6.7 £3,225.00 £2,500.00 £2,500.00 £34,259.54
16 Achnamara Village Hall Committee Partial award 6.5 £4,620.00 £2,400.00 £1,388.49 £35,648.03
17 **Furnace Community SCIO Partial award 6.5 £2,470.50 £2,470.50 £1,388.49 £37,036.52
18 Lochgair Association Partial award 6.5 £1,522.00 £1,522.00 £1,388.48 £38,425.00
19 Craignish Village Hall (Arts Programme) No award 6.4 £2,911.00 £2,500.00 £0.00 £38,425.00
20 Ardrishaig Parent and Toddler group No award 6.4 £2,400.00 £2,400.00 £0.00 £38,425.00
21 Lochgilphead Free Church of Scotland No award 6.2 £4,000.00 £2,500.00 £0.00 £38,425.00
22 MacTaggart Youth & Families Outreach Service No award 6.1 £5,000.00 £2,500.00 £0.00 £38,425.00
23 Lochgilphead Community Council No award 5.9 £11,500.00 £2,500.00 £0.00 £38,425.00
24 Kilberry 1821 Charitable Trust No award 5.9 £2,786.01 £2,500.00 £0.00 £38,425.00
Page 138

Page 139

25 Greater Kilmeny Community Group No award 5.7 £9,353.36 £2,500.00 £0.00 £38,425.00
26 Meadows under fives No award 5.6 £2,700.00 £2,500.00 £0.00 £38,425.00
27 Tayvallich Community Company No award 5.5 £7,842.00 £2,500.00 £0.00 £38,425.00
28 Ballygrant Hall Association No award 5.5 £19,800.00 £2,500.00 £0.00 £38,425.00
29 The Community Bureau No award 5.5 £3,500.00 £2,500.00 £0.00 £38,425.00
30 Friends of Succoth Ward No award 5.5 £1,500.00 £1,500.00 £0.00 £38,425.00
31 The South Kintyre Seniors Forum No award 5.4 £2,500.00 £2,500.00 £0.00 £38,425.00
32 Dochas Carers Centre No award 5.4 £1,974.00 £1,974.00 £0.00 £38,425.00
33 South Islay Development No award 5.4 £3,000.00 £2,000.00 £0.00 £38,425.00
34 Inveraray Highland Games No award 5.3 £11,590.00 £2,500.00 £0.00 £38,425.00
35 Campbeltown Old Pals No award 5.1 £6,500.00 £2,500.00 £0.00 £38,425.00
36 Tarbert Women's Football Club No award 5.1 £605.00 £605.00 £0.00 £38,425.00
37 19th Argyll Scout Group No award 5 £12,200.00 £2,500.00 £0.00 £38,425.00
38 West Kintyre Promotions CIC  No award 5 £4,500.00 £2,500.00 £0.00 £38,425.00
39 Inveraray Senior Citizens Committee No award 4.8 £2,099.00 £1,899.00 £0.00 £38,425.00
40 Tayinloan Villagers Association  No award 4.8 £2,500.00 £2,500.00 £0.00 £38,425.00
41 Rhinns Playing Fields Association No award 4.8 £39,956.00 £2,500.00 £0.00 £38,425.00
42 Campbeltown Christmas Lights No award 4.8 £2,500.00 £2,500.00 £0.00 £38,425.00
43 Carr Gomm No award 3.7 £718.75 £625.00 £0.00 £38,425.00
44 Keeping it Local CIC  No award 3.2 £12,328.00 £2,500.00 £0.00 £38,425.00  
TOTAL     £244,514.16 £99,155.04 £38,425.00 £38,425.00 
* Projects recommended to receive funds ring-fenced to support resiliency in communities impacted by Covid-19
** Projects recommended to receive funds ring-fenced to support climate change as part of the Shared Prosperity Fund 
Page 139

Page 140

Appendix 2 – Project Summary Sheet         
Applications Received (in order of scoring by Community Development Officer)
For submission to Mid Argyll, Kintyre and the Islands Area Committee for final
decision (maximum value £2,500). 
* Projects recommended to receive funds ring-fenced to support resiliency in
communities impacted by Covid-19
** Projects recommended to receive funds ring-fenced to support climate change as
part of the Shared Prosperity Fund 
Ref:  1
Applicant: *Bute Advice Centre – Mid Argyll, Kintyre and Islay 
Recommended Award: £2,500 Assessment Score (out of 10): 8.5
Project Summary:
Funding has been requested to deliver an in-person roadshow to island and
remote rural communities in Mid Argyll, Kintyre and Islay. There has been a
significantly slower and reduced uptake of the Flexible Food Fund grants in these
areas, compared to other areas of Argyll. Particularly as the need for funding can
be greater in these areas due to higher fuel prices, no access to mains gas and
inflated food prices. Bute Advice Centre are keen to resolve this disparity in the
area. 
Trained advisors would visit in-person and raise the profile of welfare rights
services, give income maximisation advice and aim to increase the uptake of
available grants. 
Recommendation: Award
Conditions: No conditions 
Ref:  2
Applicant: **Community Cycling Ardrishaig (CCA)
Recommended Award: £2,496.54 Assessment Score (out of 10): 8.3
Project Summary:
Funding would be used to deliver a launch event and embark on three
development projects. 
The launch event will showcase the resources and potential of Community Cycling
Ardrishaig (CCA), offer bike repair workshops, E-bikes’ demonstrations, and
canvass support and sign-up for development projects. 
The three development projects are:- 
Wheels to Work - Cyclists wishing to add active transport to their working day will
be recruited to try out commuting on an E-bike for an initial period of three months. 
Be an E-bike family - CCA will seek funding for four bike trailers that are
compatible with their bikes and loan them out for a period of three months to four
families. 
Page 140

Page 141

Get up and go! - Supporting older people to re-engage with cycling or continue
cycling as they get older, by providing a guided group for older people with links to
local health resources as a form of social prescribing. 
Recommendation: Award
Conditions: No conditions 
Ref:  3
Applicant: South Kintyre Development Trust
Recommended Award: £2,500 Assessment Score (out of 10): 8.1
Project Summary:
Funding would be used to maintain and develop the Kilkerran Putting Green and
Community Herb Garden in Campbeltown.  These would be used by the
community and particularly groups working with people facing disadvantage in
order to promote good mental and physical health, provide volunteering
opportunities, and to learn new skills and build confidence. 
For six months this will involve employing (a) Full Time Equivalent staff member(s)
to manage and maintain the putting green, to develop the community herb garden
and to keep Jock's Boat play park clean. Additionally, it includes the updating of
gardening equipment, putting clubs, golf balls and flag pins, as well as providing
uniforms to staff. 
Recommendation: Award
Conditions: No conditions 
Ref:  4
Applicant: Templar Arts and Leisure Centre (Tarbert)
Recommended Award: £2,500 Assessment Score (out of 10): 7.9
Project Summary:
Over a year, funding would be used towards providing a programme of 65
wellbeing sessions, involving about 400 participants.  In addition, information
leaflets about how to improve wellbeing will be created and promoted. 
Wellbeing activities would include drop-in sessions, information sessions, beginner
sessions, health boosting sessions, healthy food taster sessions and coffee
mornings with wellbeing presentations e.g. mindfulness. They will provide
dedicated sessions for children, adults with additional support needs, health care
workers, young families and older members of the community. 
Recommendation: Award
Conditions: No conditions 
Ref:  5
Applicant: Kintyre Sea Sports Campbeltown Regatta
Recommended Award: £500 Assessment Score (out of 10): 7.8 
Project Summary:
Page 141

Page 142

Funding will be used towards the cost of staging the Kintyre Sea Sports
Campbeltown Regatta in August 2023. This is a one day outdoor water-based
event.  Funding will be used toward venue hire, catering, publicity and other small
costs incurred in staging the event. 
Recommendation: Award
Conditions: No conditions 
Ref:  6
Applicant: **Kintyre Recycling Limited – Bike Project
Recommended Award: £2,000 Assessment Score (out of 10): 7.8
Project Summary:
Funding would be used to employ a marketing consultant to carry out a community
engagement exercise in order to raise the profile and secure the future of the Bike
Project. This will include running an open day for the community with bike
maintenance and test rides available. 
The Bike Project recycle and repair old bikes, promote environmental awareness,
improve people's health and wellbeing, and contribute to local economic activity
and growth. The Bike Project employs and trains local people through
employability placement opportunities. 
Recommendation: Award
Conditions: No conditions 
Ref:  7
Applicant: **Isle of Gigha Heritage Trust
Recommended Award: £1,973  Assessment Score (out of 10): 7.7
Project Summary:
Funding is requested to deliver 12 outdoor learning sessions for island children
and young people, over one year. The activities would focus on biodiversity
learning and be accompanied by free play and some refreshments. The sessions
would provide a social, active, safe and educational space for children. 
Recommendation: Award
Conditions: No conditions 
Ref:  8
Applicant: Islay Community Council 
Recommended Award: £2,500 Assessment Score (out of 10): 7.7
Project Summary:
Funding is requested to produce an all-Islay Community Action Plan. Islay has
never had a Community Action Plan covering the whole island. There is an
existing Community Action Plan covering South Islay, developed by the South
Islay Development Trust which is now due for reassessment. 
Page 142

Page 143

Islay Community Council will work with South Islay Development Trust and with
other community organisations on the island to produce a comprehensive Islay
Community Action Plan which will cover all the communities on Islay and form a
road map for future services and provisions on the island. 
Recommendation: Award
Conditions: No conditions 
Ref:  9
Applicant: *Islay & Jura Community Enterprise
Recommended Award: £2,500 Assessment Score (out of 10): 7.4
Project Summary:
Over a one year period, funding would be used to provide free weekly swimming
therapy sessions for children with disabilities and additional support needs, in the
MacTaggart Leisure Centre, 
These sessions would include:-
 Weekly group sessions with a special needs instructor 
 Family sessions, less structured with more emphasis on fun and play
 Structured individual sessions would be with special needs instructor in the
water with the child on 1:1 basis 
Each session would last 45 minutes and at least 12 children would benefit from
these activities. Free transport will also be provided. 
Recommendation: Award
Conditions: No conditions 
Ref:  10
Applicant: KADAS (Kintyre Alcohol and Drugs Advisory Service)
Recommended Award: £2,500 Assessment Score (out of 10): 7.2
Project Summary:
The funding would be used to deliver 10 cookery workshops for young carers and
young people experiencing difficulties associated with alcohol, drugs and mental
health. The workshops will be two hours in length. It will provide the young people
develop the skills to safely cook nutritious meals. 
Recommendation: Award
Conditions: No conditions 
Ref:  11
Applicant: Mid Argyll Community Enterprise Ltd (MACPOOL)
Recommended Award: £2,400 Assessment Score (out of 10): 7.1
Project Summary:
This funding would be used to allow the MACPool to offer 1000 concessionary
tickets to approximately 100 people who are in receipt of benefits. In order to
improve their health and wellbeing, confidence and practical swimming skills. 
Page 143

Page 144

Recommendation: Award
Conditions: No conditions 
Ref:  12
Applicant: Campbeltown and District Juvenile Football Association
Recommended Award: £2,390 Assessment Score (out of 10): 6.9
Project Summary:
This funding would be used to pay for pitch hire for a 10 day football camp (7
hours per day), healthy snacks, medals and printing forms. This activity will be for
300 children and young people and led by volunteer coaches. 
Recommendation: Award
Conditions: No conditions 
Ref:  13
Applicant:  Inspire Inveraray 
Recommended Award: £2,500 Assessment Score (out of 10): 6.9
Project Summary:
The funding would be used to employ an independent consultant to extensively
consult with the community to identify what they need and want from a community
hall. This is a follow up from a general Community Action Plan published in 2022
which identified that the community wants a useable community hall, as the
existing hall has been closed for 13 years. 
The outcome of the consultation will be used as a road map for developing the
Community Hall Project, in whatever form the community decide collectively. 
Recommendation: Award
Conditions: No conditions 
Ref:  14
Applicant: Ardrishaig KGV Community Park Association
Recommended Award: £2,500 Assessment Score (out of 10): 6.8 
Project Summary:
Over the next 18 months, the funding would be used by Ardrishaig KGV
Community Park Association towards making safe the native woodland area,
clearing non-indigenous shrubs, exposing the woodland floor to greater sunlight to
promote wildflower growth, plant native species of trees and create accessible
paths. 
The group will then deliver a large community woodland event, which includes,
flora and fauna identification by qualified professionals and a bio-blitz to
understand the biodiversity of the native habitat. 
Page 144

Page 145

The funding would also be used to bring the community football pitch back into use
through repair and installation of the drainage system, with the aim of providing
sporting activities. 
Recommendation: Award
Conditions: No conditions 
Ref:  15
Applicant: Campbeltown Brass Band
Recommended Award: £2,500 Assessment Score (out of 10): 6.7
Project Summary:
This funding would be used for hall hire and tutor fees so that the group can
establish a monthly musical recital club in Campbeltown for young band members
to gain performance skills curtailed during the pandemic. 
The group would also deliver 9 workshops, 3 hours in length per year (Easter,
Summer and Autumn) with professional brass tutors. 
Recommendation: Award
Conditions: No conditions 
Ref:  16
Applicant: Achnamara Village Hall
Recommended Award: £1,388.49 Assessment Score (out of 10): 6.5
Project Summary:
Over the next year, the funding would be used towards delivering the following
activities for the Achnamara Community:-
 20 Creative Crafting Sessions
 30 Singing Sessions
 4 Musical Events
 4 Film Nights
 6 Book Club Sessions 
Recommendation: Partial award
Conditions: No conditions 
Ref:  17
Applicant: **Furnace Community SCIO 
Recommended Award: £1,388.49 Assessment Score (out of 10): 6.5
Project Summary:
The funding would be used towards the Furnace Village Grow Your Own Project. 
This project will involve:-
 A workshop to bring together 30 villagers to learn how to create colourful
displays of flowers and how to grow their own vegetables
 Planting containers for common areas of the village
 Supporting villagers who wish to grow their own vegetables 
Page 145

Page 146

 Children’s sunflower growing competition to encourage youngsters to join in
and maybe a prize for the tallest sunflower later in the year 
Recommendation: Partial award
Conditions: No conditions 
Ref:  18
Applicant: Lochgair Association
Recommended Award: £1,388.48 Assessment Score (out of 10): 6.5
Project Summary:
The funding would be used to create a community garden for the Lochgair village
community. This would be a focal point for community activities and will provide
local volunteers with a positive project to undertake. 
Recommendation: Partial award
Conditions: No conditions 
Ref:  19
Applicant: Craignish Village Hall
Recommended Award: £0 Assessment Score (out of 10): 6.4
Project Summary:
The funding would be used for materials, labour costs and sundry expenses of
running a Lantern Project with the local community. Follow on project from last
year’s pilot building on that success and looking at future sustainability. 
Recommendation: No award
Conditions: 
Ref:  20
Applicant: Ardrishaig Parent & Toddler Group
Recommended Award: £0 Assessment Score (out of 10): 6.4
Project Summary:
Over an 18 month period, Ardrishaig Parent & Toddler Group would use the
funding for hall hire, new toys for children and delivering 5 workshops that appeal
to young children. 
Recommendation: No award
Conditions: 
Ref:  21
Applicant: Lochgilphead Free Church
Recommended Award: £0 Assessment Score (out of 10): 6.2
Project Summary:
The funding would be used to employ a consultant to carry out a community
engagement exercise and produce a business fundraising plan for the proposed
renovation of the Lochgilphead Free Church building. 
Page 146

Page 147

Recommendation: No award
Conditions: 
Ref:  22
Applicant: MacTaggart Youth & Families Outreach Service
Recommended Award: £0 Assessment Score (out of 10): 6.1
Project Summary:
The funding would be used to employ a trainee youth worker and purchase art
supplies for an art project for young people which would include painting a picnic
bench and designing and painting a ceilidh dress.   
Recommendation: No award
Conditions: 
Ref:  23
Applicant: Lochgilphead Community Council
Recommended Award: £0 Assessment Score (out of 10): 5.9
Project Summary:
Lochgilphead Community Council would use the funding to assist in the delivery of
a local re-enactment festival. 
This is part of the Community Council initiative to increase the number of
community events in Lochgilphead for local residents and tourists. 
Recommendation: No award
Conditions: 
Ref:  24
Applicant: Kilberry 1821 Charitable Trust
Recommended Award: £0 Assessment Score (out of 10): 5.9
Project Summary: 
The funding would be used to cover the insurance and electricity so the community
can begin organising community activities in the former Kilberry Church which has
recently come into community ownership. The Trust acquired the building on 24th
February 2023. 
Recommendation: No award
Conditions: 
Ref:  25
Applicant: Greater Kilmeny Community Group
Recommended Award: £0 Assessment Score (out of 10): 5.7
Project Summary:
Page 147

Page 148

Funding would be used towards sports equipment, soft play equipment and public
liability insurance, to provide badminton, yoga, carpet bowls, table tennis, darts
and soft play along with other events in the local village hall. The activities would
be open to everyone, of all ages and abilities and aims to encourage people out of
their homes to mix with other people, get to know new people, get fitter as well as
improving their mental health.  
Recommendation: No award
Conditions: 
Ref:  26
Applicant: Meadows under fives
Recommended Award: £0 Assessment Score (out of 10): 5.6
Project Summary:
The funding would be used to buy a range of sensory toys to improve outdoor and
indoor learning for children age 3 and under. 
Recommendation: No award
Conditions: 
Ref:  27
Applicant: Tayvallich Community Company
Recommended Award: £0 Assessment Score (out of 10): 5.5
Project Summary:
The funding would go towards the installation of solar panels on the Tayvallich
Village Store. The solar panels would run the shop’s fridge and freezers and
reduce electricity costs. 
This is a community owned shop, operated for community benefit. 
Recommendation: No award
Conditions: 
Ref:  28
Applicant: Ballygrant Hall Association
Recommended Award: £0 Assessment Score (out of 10): 5.5
Project Summary:
Funding would be used towards the repair of the village hall.  The group are
raising significant funds to undertake repairs to the building and grounds to make it
more accessible and fit for purpose.   
Recommendation: No award
Conditions: 
Ref:  29
Applicant: The Community Bureau
Page 148

Page 149

Recommended Award: £0 Assessment Score (out of 10): 5.5
Project Summary:
Funding has been requested to pay for transport and staffing costs to run a
community walking programme. Focus is on mental health and wellbeing. 
Recommendation: No award
Conditions: 
Ref:  30
Applicant: Friends of Succoth Ward
Recommended Award: £0 Assessment Score (out of 10): 5.5
Project Summary:
Funding has been requested to purchase welcome packs for inpatients of the
Succoth Ward in Lochgilphead and to provide 30 sessions of instructor-led
movement and dance therapy. 
Recommendation: No award
Conditions: 
Ref:  31
Applicant: The South Kintyre Seniors Forum
Recommended Award: £0 Assessment Score (out of 10): 5.4
Project Summary:
Funding requested to help fund 12 trips for members of The South Kintyre Seniors
Forum, as part of their annual activities - this would include leisure trips and also
transport to Oban to help access shops etc. not available in the local area. 
Recommendation: No award
Conditions: 
Ref:  32
Applicant: Dochas Carers Centre
Recommended Award: £0 Assessment Score (out of 10): 5.4
Project Summary:
Funding toward running 25 year celebration event.  Funding will be used to offer
transport to the location, to employ extra staff needed to man the event and some
material costs required for the event to happen. 
Recommendation: No award
Conditions: 
Ref:  33
Applicant: South Islay Development
Recommended Award: £0 Assessment Score (out of 10): 5.4
Project Summary:
Page 149

Page 150

Funding has been requested to help deliver the Port Ellen Community Sports Day.
South Islay Development are looking to purchase some equipment required for
this event that brings the community together for a day of exercise and fun. 
Recommendation: No award
Conditions: 
Ref:  34
Applicant: Inveraray Highland Games
Recommended Award: £0 Assessment Score (out of 10): 5.3
Project Summary:
Inveraray Highland Games are requesting funding towards the hire of marquees
on games day. This traditional Highland Games attracts around 4000 people, 400
competitors and 100 stewards and helpers. Events include piping, highland
dancing, heavyweights, athletics, cycling and wrestling, alongside stalls where
local businesses sell food, crafts etc. 
Recommendation: No award
Conditions: 
Ref:  35
Applicant: Campbeltown Old Pals
Recommended Award: £0 Assessment Score (out of 10): 5.1
Project Summary:
Funds are requested to go towards hall hire, minibus hire and a sessional worker
to help run the Campbeltown Old Pals Group, in order to fully re-establish the
group after the pandemic. 
Recommendation: No award
Conditions: 
Ref:  36
Applicant: Tarbert Women's Football Club
Recommended Award: £0 Assessment Score (out of 10): 5.1
Project Summary:
Funding requested for football kits, equipment, bibs, balls and cones for Tarbert
Women’s Football Club. 
Recommendation: No award
Conditions: 
Ref:  37
Applicant: 19th Argyll Scout Group
Recommended Award: £0 Assessment Score (out of 10): 5
Project Summary:
Page 150

Page 151

Funding requested towards a trip for the 19th Argyll Scout Group to take approx. 80
children and young people to Lochgoilhead for a weekend of outdoor activities. 
Recommendation: No award
Conditions: 
Ref:  38
Applicant: West Kintyre Promotions CIC 
Recommended Award: £0 Assessment Score (out of 10): 5
Project Summary:
Funding requested to expand West Kintyre Festival/Fun day in Clachan. The event
will include music artists to play across the afternoon and evening, children’s
activities, food and drink, and a market zone where local good causes can provide
information and raise funds. 
Recommendation: No award
Conditions: 
Ref:  39
Applicant: Inveraray Senior Citizens Committee
Recommended Award: £0 Assessment Score (out of 10): 4.8
Project Summary:
To fund a trip for 29 members to the theatre. Funding will be used to cover the cost
of the coach, theatre admission and meal. 
Recommendation: No award
Conditions: 
Ref:  40
Applicant: Tayinloan Villagers Association 
Recommended Award: £0 Assessment Score (out of 10): 4.8
Project Summary:
Funding requested for grass cutting, picnic benches, a fun day and a new lawn
mower for Tayinloan Play Park and football pitch. 
Recommendation: No award
Conditions: 
Ref:  41
Applicant: Rhinns Playing Fields Association
Recommended Award: £0 Assessment Score (out of 10): 4.8
Project Summary:
Requesting funding towards the installation of a modular pump track for Rhinns
Playing Fields. Pump tracks are sports tracks for everyone, they get people of all
Page 151

Page 152

ages and abilities active and exercising and can be used for cycling, skate-
boarding and scootering. 
Recommendation: No award
Conditions: 
Ref:  42
Applicant: Campbeltown Christmas Lights
Recommended Award: £0 Assessment Score (out of 10): 4.8
Project Summary:
To professionally repair a section of Christmas Lights, this includes transportation
of lights to contractor. The Campbeltown Christmas Lights are an important part of
the festive season and include a community event with a wide range of activities
for all ages when the lights are switched on. 
Recommendation: No award
Conditions: 
Ref:  43
Applicant: Carr Gomm
Recommended Award: £0 Assessment Score (out of 10): 3.7
Project Summary:
To fund ‘Keep Warm Boxes’ to help those who are vulnerable or impacted by
rising energy costs and power cuts to stay warm.  Funding is requested to provide
12 boxes. 
Recommendation: No award
Conditions: 
Ref:  44
Applicant: Keeping it Local CIC 
Recommended Award: £0 Assessment Score (out of 10): 3.2
Project Summary:
Funding requested to support the core costs (premises, utilities, accounting and
insurance) of the Keeping it Local project in Campbeltown and its information
network screens across Mid Argyll, Kintyre and Islay. 
Recommendation: No award
Conditions: 
Page 152

Page 153

1 
Year One Progress Report
Page 153 Agenda Item 14

Page 154

2
Contents
Foreword ........................................................................ 4
Introduction .................................................................... 5
Key Achievements ........................................................... 6
Children’s Services ............................................................................................................. 6
Child Poverty ......................................................................................................................... 6
Child Protection .................................................................................................................... 7
Violence Against Women and Girls ............................................................................... 8
Adult Protection ................................................................................................................... 9
Community Justice ........................................................................................................... 10
Public Health ....................................................................................................................... 11
Right Care Right Time ..................................................................................................... 12
Adult Care –Older Adults/Adults and Hospitals ..................................................... 13
Learning Disabilities ......................................................................................................... 14
Mental Health ...................................................................................................................... 15
Primary Care ....................................................................................................................... 16
Dentistry ............................................................................................................................... 17
Alcohol and Drug Partnership (ADP) .......................................................................... 18
Allied Health Professionals (AHP) ................................................................................ 22
Carers .................................................................................................................................... 22
Prevention Programme ................................................................................................... 23
Digital Health and Care Strategy ................................................................................ 23
Coporate Services ............................................................................................................. 24
Technology Enabled Care (TEC) .................................................................................. 24
Performance Management and Governance ........................ 26
Introduction ......................................................................................................................... 26
Integrated Performance Management Framework (IPMF) ................................ 26
Key Performance Overview ........................................................................................... 27
Benchmarking ..................................................................................................................... 27
Waiting Times & Long Waits ......................................................................................... 27
Homecare ............................................................................................................................. 28
Residential Care ................................................................................................................. 29
Delayed Discharge ............................................................................................................ 29
Adult Support & Protection ............................................................................................ 30
Resilience in Care at Home (Unmet Need).............................................................. 30
Page 154

Page 155

3
Children & Families ........................................................................................................... 31
Community Health ............................................................................................................ 32
Adult Care ............................................................................................................................ 32
Technology Enabled Care & Falls ................................................................................ 33
Child & Adolescent Mental Health & Psychological Therapies .......................... 34
Winter & Systems Pressures ......................................................................................... 34
Financial Performance and Best Value ............................... 35
Financial Performance ..................................................................................................... 35
Financial Performance 2022-23 ................................................................................... 35
Financial Outlook, Risks and Plans for the Future ................................................ 35
Best Value ............................................................................................................................ 36
Appendices ................................................................... 39
Appendix 1 IJB Scorecard ................................................................................................... 39
Appendix 2 HWBOI’s/ Benchmarking .............................................................................. 41 
Page 155

Page 156

4 
Foreword 
Argyll and Bute Health and Social Care Partnership has experienced another difficult year as
we try to recover from the obvious challenges of the past few years.
This year the HSCP continued to struggle with workforce sustainability, reduced capacity in
the community and backlogs in our waiting times to name just a few.
Despite this, the HSCP continues to be ambitious for our communities and this report
highlights the positive outcomes the integration of health and social care services can have
on individuals, families and the wider community along with the input of those with lived
experiences of our services.
Our Staff, Partners, Carers and Volunteers continue to demonstrate the upmost dedication,
hard work, resilience and commitment to our services. We continue to be thankful and
grateful for everyone’s efforts in these difficult times. 
Sarah Compton-Bishop                                                           Fiona Davies      
Chair of Argyll & Bute                                                Chief Officer of Argyll & Bute 
Integration Joint Board                                                                HSCP 
Page 156

Page 157

5
Introduction 
Welcome to Argyll and Bute’s Annual Performance report for the year 2021 as required by
Public Bodies (Joint Working) (Scotland) Act of 2014.
This document sets out how the Health and Social Care Partnership (HSCP) has performed
and builds on the information published within previous reports and to provide progress on
how we have improved and adapted, reshaping services which are fit for the future.
The HSCP is a complex organisation bringing together a range of partners, services and
substantial financial resources. The partnership is responsible for meeting local and national
objectives and it is therefore important that we publically report on how we are performing
against the agreed outcomes that we aspire to.
The Annual Performance report provides an opportunity to reflect on the past year. A year
that was extremely challenging yet we were still able to celebrate achievements.
I thank all colleagues and partners for their ongoing efforts to deliver our vision and
essential health and social care services for local people and those most in need, and hope
we can all share in the successes of delivering longer, healthier and independent lives. 
Page 157

Page 158

6
Key Achievements 
Priorities Year 1  Progress
Continue to deliver on the Children and Young
Peoples Service Plan (CYPSP). 
The Children and Young Peoples Service Plan work
continues, the new Plan for 2023 – 26 is currently being
progressed.
Continue to deliver on the Corporate Parenting
Plan.
On track and progress monitored by Corporate Parenting
Board and reported to Strategic Group.
Continue to monitor and evaluate progress in all
our service plans. 
Progress is monitored and evaluated annually, updated are
reported and send to Scottish Government.
Develop transformation aspirations for the Service.  Work is progressing to ensure more young people are
involved in the CYPSP.
Develop programme of change in relation to the
Children’s Promise Change programme. 
The Promise is an ambitious 10 yr national
transformational change programme for Scotland’s Care
system. Local actions embedded in Corporate Parenting
Plan and CYPSP. 
Continue to engage with Children and staff on
transformation agenda. 
We have established 7 locality care experienced
participation forums which meet regularly. 
Work is progressing to ensure more young people are
involved in the CYPSP.
Evaluate the outcomes of the 2018-2021 Argyll and
Bute Equally Safe Implementation Plan. 
A meeting took place to discuss this but it was decided to
delay update in order to align the plan with the Community
Justice Plan.  Update will take place in 2023.
Continue to act as a conduit for information and
resources on Equally Safe / Train/ National
initiatives for managers and staff.
This has been taking place and will continue to do so.
Develop project plan for Transforming Responses to
Violence against Women and Girls Project.  
Plan was developed and will be updated in 2023. 
Priorities Year 1  Progress
Child Poverty Action Group to continue to meet and
develop actions to tackle the three drivers of child
poverty.
Child Poverty Action Group has continued to meet and
monitor and tackle the three drivers of poverty.
Look at impacts of Covid-19 and EU exit; consider
what actions are required by the Child Poverty
Action Group and its members to address these.
This has been done and necessary measures taken by our
members; for example extending the Flexible Food Fund
and ensuring best coverage by advice services.
Produce a formal communications and engagement
plan.
A Communications and Engagement Group has been
formed and there is a draft communications and      
Children’s Services 
Child Poverty
Page 158

Page 159

7 
engagement plan that is being worked on.
Begin to deliver Money Counts training to staff in
Argyll and Bute. 
This has taken place and is ongoing.  There was also the
delivery of a wide range of other training events for staff
designed to improve awareness and service delivery.
Review the Child Poverty Action Plan and assess
progress on key areas of work.
The plan was reviewed and published in 2022.  Reporting
duties were met and the report outlined key areas of
work. 
Begin to develop a Data Base to improve
monitoring and focus of resources locally. 
Data has been collated for the plan and other purposes. 
A new data collection and analysis system “Power BI” is
now being developed and will greatly improve our ability
to recognise areas of local need. 
Priorities Year 1  Progress
All new Child Protection Committee (CPC) members
will receive a CPC induction pack and will meet with
Lead Officer to discuss the role of the CP and
expectations of CPC members. All CPC members will
attend CPC development sessions to contribute to
the role and function of the CPC. Members will be
required to demonstrate through the delivery of the
CPC improvement plan that information is being
disseminated within their organisation and that
actions attributed to their organisation are
progressed and reported to CPC.
Induction pack complete.  All new members have met
with Lead Officer.  This is ongoing as and when new
members attend.
We have recorded via minutes when information has to
be disseminated within organisations and what action
has been taken.
Produce and implement a biennial Strategic
improvement plan which will be monitored by the
Performance, Quality and Assurance (PQA) using a
RAG system. Red actions will be reviewed by PQA
and reported to CPC.
Plan in place and being monitored. Some slippage due
to post Covid challenges and staffing challenges.  CPC
does not currently have a lead officer so plan needs to
be reviewed to ensure on track for rest of 2023.
Multi agency training will be delivered using a tiered
approach to learning which will include: General
contact workforce, Specific contact workforce and
Specialist contact workforce. 
Training has been delivered via online following Covid
challenges.  Some face to face key training delivered. 
Training has had to be halted as CPC does not have a
training officer – awaiting advert and appointment. 
Online training can be accessed across partner agencies. 
This will require to be addressed as soon as the training
officer is in post.
Develop and implement training framework which
supports practitioner knowledge and confidence in
working with Child Sexual Abuse which includes Child
Sexual Exploitation and child trafficking.
This work had to be cancelled last year due to
competing practice demands.  Will be picked up when
the new Lead Officer comes in to post.
Domestic Abuse Guidance and Flowchart
implementation to be evaluated and regular audits of
referrals to be carried out.
Domestic Abuse guidance has been implemented
however no auditing working has taken place.  This
should be a priority during 2023.
Improved interface between children & adult
services particularly where parental mental health
substance misuse and domestic abuse are present.
One meeting has taken place, but still significant work to
align Children and Families and adult processes
Joint session between Adult Protection Committee and
Child Protection planned for May 2023.        
Child Protection
Page 159

Page 160

8 
Advocacy services will engage with children on the
Child Protection register to understand their
experience and to provide the CPC with
recommendations as to how things can be improved. 
CPC receives bi-annual reports from the advocacy
worker.  The reports provide evidence of face to face
engagement with children and seek the views and
comments by children and families.  CPC find these
reports very informative re needs of children on the
Child Protection register. 
Priorities Year 1  Progress
Establish a Project Board to oversee the delivery
of the Transforming Responses to Violence Against
Women and Girls Project.
A board has been established although there have been
difficulties in arranging some meetings.
Use the Domestic Abuse-Informed Practice and
Systems: Self-Assessment Tool to establish a
baseline for services prior to training and service
change measures.
The tool was used and the survey stage undertaken; it
has not yet been possible to complete the process with
the board.
Establish working groups to facilitate training and
other aspects of the transformation project.  
Working Groups have delivered on the necessary areas of
training and on the research elements of the plan.  This
will continue in 2023.
Research to assess the impact of the Transforming
Responses to Violence Against Women and Girls
Project, to begin.
The first phase of research has taken place, looking at
lived experience and staff views of services.  A second
phase looking at the views of perpetrators will take place
in 2023.
Roll out of the Safe and Together Model to
commence. 
This has begun and a large number of staff and some
managers are currently undertaking training.  There has
been some delay due to operational reasons.  Roll out will
continue through 2023 – 2024.
Roll out of other training to commence including;
Awareness Raising; Routine Enquiry; Zero
Tolerance and Commercial Sexual Exploitation. 
Seven events were successfully delivered and this will
continue in 2023-2024.  It was not possible to delivery
Zero Tolerance as the organisation no longer offers
specific training to organisations.  
Roll out of DASH training to relevant workers.  This has been taking place and will continue in 2023.
Review the Argyll and Bute Equally Safe Plan.  This was delayed due to the need to align with
Community Justice Plans.  Will take place in 2023.
Development of Data Base that will assist us to
monitor trends in Domestic Violence and other
gendered violence.
Whilst some data was collected development of a data
base still requires to be done in 2023.
Deliver Annual Return from Argyll and Bute to the
Improvement Service / National Violence Against
Women Forum.
This did take place and will be updated in 2023.        
Violence Against Women and Girls
Page 160

Page 161

9 
Priorities Year 1  Progress
Meet the Improvement Plan targets arising from
Inspection. 
Progress made:-
 We have introduced a trial of a new Chronology
format to ensure standardisation and improve quality
of chronologies.
 We have encouraged in person participation in Adult
Support and Protection (ASP) case conferences where
appropriate and safe to do so.
 Training has been developed to ensure appropriate
use of trained second workers from Health and other
disciplines.
 Through the Council Officer Forum and ASP training
we have ensured regular use of case studies and
Significant Case Review (SCR) Findings.
 Staff support is provided by development of Council
Officer, Multi-Agency Forums and ASP training. 
Emphasis is placed on Trauma Informed Practice via
revised Codes of Practice dissemination.
 Further development of Awareness ASP training
achieved and targeted at specific groups, to improve
knowledge and understanding of ASP process, across
the Partnership, and raise awareness within the
Community.
Implement Code of Practice changes.  We have continued to implement Code of Practice
revision sharing briefings on changes across the
Partnership,  including:- 
 Further detail on the 3 point criteria.
 Clarification on capacity and consent.
 Emphasis on duty to refer and co-operate in Inquiries.
 Clarification regarding sharing expectations and the
new section on chronologies.
 Clarification of relationship between inquiries and
investigations.
 Further detail and clarification on visits and
interviews.
Implement guidance for Primary Care and GP’s.  New guidance introduced July 2022, promoted through
Adult Protection Committee and Authority wide ASP
Action Team. Material passed to NHS colleagues for their
attention.
Progress audit activity, case files. Investigation undertaken to determine most appropriate
platform in order to streamline process. Short life
working group to be established to plan audit proposed
for May/June 2023.        
Adult Protection Page 161

Page 162

10 
Develop issues arising from Initial Case Reviews,
Large Scale Investigation findings. 
Several overarching Adult Protection and Adults with
Incapacity themes have been scrutinised and practice
improvements made with regard to the findings of an
Initial case review.  Specifically process around
Guardianship/Adults with Incapacity/Mental Health
Officer roles, and reviews, Care at Home – Social Work
support, financial management where an individual is
considered an Adult with Incapacity and there is a
requirement for clear lawful authority.
Major review of care at home services and financial
controls introduced following an Initial Case Review.
Develop ‘escalation’ policy.  Recognising that ASP case escalation forms part of a
wider multi-agency escalation policy the service has
contributed to the development of the Partnership’s
Complex Case Escalation Protocol.
Support staff and communities as
recovery from Covid regulation
emerges. 
Emphasis within staff and community awareness training
has been placed on neglect and self-neglect (particularly
identifying signs and symptoms) increasingly evident in
larger numbers since Covid.  Staff have been supported
to consider best practice in ensuring the Adult remains at
the centre of all ASP activity as work practice changes -
working from home, online case conferences. 
Priorities Year 1  Progress
Develop a local Community Justice Outcome
Improvement Plan, in line with the priorities of
the Scottish Government national Justice and
Community Justice Strategies. 
Refreshed National Strategy for Community Justice
published June 2022.  Associated Outcomes, Performance
and Improvement Framework delayed publication date
now 01/04/2023.  Local plan development progressing
well, draft key actions agreed by Community Justice
Partnership, statutory consultation process underway. 
Expected publication date June 2023.  
Develop strategic and operational links with Third
Sector and Children’s Services (Youth Justice) and
other key local partnerships. 
Community Justice Partnership agreed a Youth Justice
work stream, in the process of establishing a multi-agency
sub group. 
Third Sector statutory consultation underway in relation
to development of the local Community Justice Outcome
Improvement Plan.
Support and monitor the implementation of the
Justice Social Work (Community Justice)
Improvement Plan. 
Justice Social Work Service Plan is complete, Community
Justice Partnership scrutiny process in final stages of
completion, reliant on the publication of the Scottish
Government Outcomes and Performance Improvement
Framework due 1 April 2023.
Review the learning from the first phase jointly
commissioned research report for Violence
Against Women & Girls and implement key
recommendations.
Final report due March 2023.  Draft report (excluding
analysis and key findings from consultation) received and
presented to Community Justice Partnership. 
Community Justice 
Page 162

Page 163

11 
Implement the prison Custody to Community
pathway, including performance reporting and
monitoring. 
Proposals for model of delivery agreed by Community
Justice Partnership, consultation with wider third sector
partners underway.  Commissioning additional third
sector support in relation to independent advocacy
underway.  Publication of the Scottish Government
Community Justice Outcomes and Performance
Improvement Framework delayed until 1st April 2023.
Finalise the review of our local Community Justice
Partnership. 
Significant progress has been made in prioritising and
streamlining the Partnership.  Due to the delay in
publication of the national Outcomes, Performance and
Improvement Framework, we will finalise during
2023/2024. 
Priorities Year 1  Progress
Develop joint Health Improvement plan between
Argyll and Bute and North Highland. 
A joint two-year Health Improvement plan has been
developed between Argyll and Bute and Highland, with a
view to delivering some pieces of work NHS Highland-
wide where appropriate.  The joint workplan was
developed using team workshops to identify priorities
and then small working groups to refine each topic.  As
this is a new joint development, it will be monitored for
effectiveness.  The aim is to improve collaboration and
working relationships, share learning and streamline
pieces of work where relevant. Local context will always
be considered within each workstream.
Pandemic recovery - Social Mitigation Strategy:
child poverty; financial inclusion; children’s rights;
equalities; mental health improvement and
support. 
The public health team contribute to the Child Poverty
agenda through the Argyll and Bute Child Poverty Action
Group and the Argyll and Bute Financial Inclusion and
Advice Group.  We have delivered Money Counts training
to a range of health, social care, and 3rd sector staff. 
Deliver on the 5-year implementation plan for
Living Well strategy: workforce development; self-
management; community link working; physical
activity; mental wellbeing; suicide prevention;
smoking cessation. 
Public Health and partners (including Argyll and Bute
HSCP, Argyll and Bute Council and 3rd sector) continue to
deliver on the 5-year Living Well strategy implementation
plan.  A mid-strategy report was published and
disseminated.  This report celebrates the wealth of work
undertaken by Living Well partners, the Living Well
Networks and via the Living Well capacity building fund
over the first 2.5 years of the strategy. It also allows us to
reflect on the challenges of the COVID-19 pandemic and
how this impacted on self-management and our
communities. Finally, this report looks ahead to the
future of Living Well and the importance of its links to the
Argyll and Bute Health and Social Care Partnership (HSCP)
Joint Strategic Commissioning Strategy (JSCS) and Joint
Strategic Plan (JSP). 
Public Health 
Page 163

Page 164

12 
The 5-year implementation plan has been reviewed and
focused steering group meetings have been agreed to
progress any outstanding pieces of work.  The Living Well
steering group continue to meet bi-monthly.
Building capacity for health improvement:
education; Living Well Networks; community
planning; locality planning groups; engagement;
place-based work. 
The Public Health team continue to build capacity for
health improvement in partners and our communities. 
Our Living Well networks hold quarterly meetings within
their local areas which are well attended by members of
the community, Third Sector and Statutory sector. In
addition, communications, surveys, consultations etc
from various sources (e.g. Public Health team, Locality
Planning Groups, Third Sector) are sent out by email and
social media via the Networks. 
The Public Health team regularly attend Area Community
Planning Groups, relevant thematic Community Planning
groups and Locality Planning groups to build capacity for
health improvement and coproduction. 
The Public Health team host bimonthly education
sessions open to HSCP staff and Third Sector. Recent
sessions included survey design, Versus Arthritis,
gambling harm and the Shaping Places for Wellbeing
programme.
Respond and deliver national strategy and targets
– suicide prevention; smoking cessation; Fairer
Scotland. 
The Smoking Cessation team within Public Health
continue to deliver a service across A&B that targets the
40% most deprived communities but is available to all
residents. The targets set by Scottish Government for
NHSH are reviewed regularly to ensure the optimum
progress is made towards achieving these. The team are
also employing their expertise in working with clients on a
1-1 basis to raise awareness of screening opportunities in
line with strategy from the Scottish Government. 
The Public Health team supports the delivery of the local
suicide prevention action plan working with the suicide
prevention group.
Alcohol and Drug Strategy actions – reduce drug
deaths; recovery orientated support.
Alcohol and Drug strategy actions are reported under the
Alcohol and Drug specific priorities. 
Priorities Year 1  Progress
Unscheduled Care (USC) leadership post in place.  Recruitment of Programme Manager start date April 2023.
Localities will have agreed actions plans to
support the two key areas of improvement.
No we re-focused this as an area wide plan rather than on
localities.
Plan and progress spend on the recurring A sub group has been established to oversee spend in     
Right Care Right Time 
Page 164

Page 165

13 
funding from Scottish Government.  relation to Key Performance Indicators, this reports to USC
Steering Group.
Established working groups with capacity to
progress change and support localities. 
Three sub groups established: Enablers, Community Teams
and Discharge without Delay. Focusing on key priorities.
Programme Manager will support.
Enhancing multi-disciplinary community teams
to be responsive, flexible, highly skilled,
continually assessing with a re-abling and
rehabilitation ethos and high quality end of life
care with the skills to provide simple care that
currently involves a hospital admission.
This will relate to the work of the Community Teams and
the care at home strategy group. There is also overlap with
the development of the palliative care section of the older
adult strategy.
Enhance clinical education for all staff develop
skill mix, apprenticeships and health care
support worker skilled roles. 
The updated action plan developed by the Community
Teams from the Community Standards will be supported in
implementation through the Enablers sub group. This
forms part of the Enablers sub group.
Provide enabling care at home that is effectively
commissioned and planned for those who need
it, with enough capacity to be provided following
assessment at home and at the point of need. 
A Smarter Commissioning Process has been developed.
Assessment of unmet need is ongoing there is a clear
process of reviewing unmet need. Longer term focus on re-
ablement and care at home modelling is required and
being considered through the Care at Home Strategy
development.
Performance metrics regular reported on. Key Performance Indicators have been developed and will
link with the Integrated Performance Framework.
Evaluate spend on community teams, unpaid
carer services & short breaks, response services,
care at home, community palliative care and
NHS GG&C delayed discharge.
For year 2
Consider models for community services with
the aim of minimising different services/staff
visiting people in community and improving flow
through hospital.
As above- linked to Community Teams and Social Work
Action plan through the review of Community Standards. 
What do our communities want to increase
support unpaid carers? 
Engagement on short breaks-looking for short break
support at home.
What do communities want from HSCP
community teams?
Limited engagement so far. 
Agree model that assist us to move towards a
National Care Service.
Partly related to Getting It Right For Everyone. 
Priorities Year 1  Progress
Support care at home through a challenging
winter, linking unscheduled care elements to
limit duplication and make best use of the total
resource available. 
Extensive efforts have gone into both reporting and
assuring on care at home services including the
development of mobile teams to meet unmet need.
Smarter Commissioning is being rolled out with providers.
A review of this process will provide information required
on resource availability and whether this way of working is
beneficial to service users and staff. It will also ensure that       
Adult Care –Older Adults/Adults and Hospitals 
Page 165

Page 166

14 
all providers are working collaboratively to deliver the most
effective and efficient service possible and will feed into
the tender process due next year.  A redesign of care at
home with relevant support from other disciplines is
required.
Develop a care at home strategy to agree and
monitor key developments to build a flexible and
sustainable service. 
Work has been undertaken to scope the main elements of
the care at home strategy which needs to link with internal
redesign and timescales for developing the care at home
contract.
Develop an Older Adult Strategy.  We have worked on a number of areas of the strategy
focusing on:
 Care Homes and Housing
 Palliative and End of Life Care
 Care at Home
 Right Care, Right Time
 There have also been links to National areas of strategy
 Strategy needs completed and consulted on.
Develop a robust plan around winter planning,
mapping out all elements of service delivery,
what the pressures are and how they impact on
each other. 
We submitted a Winter Checklist to the Scottish
Government in November 2022 and a winter plan was
developed for Argyll and Bute. 
We reviewed our operational and governance structures
for winter planning and pressures and with refinement we
should retain this structure and process for 2023-2024.
Work in partnership with providers, supporting
elements such as recruitment, training to ensure
best use of resources. 
Additional human resource support has been identified to
link recruitment and retention processes with all care
providers – internally provided and externally
commissioned by the HSCP. These posts will also link to the
wider corporate regeneration agenda for Argyll and Bute.
Review the use of Extended Community Care
Teams (ECCT) and link them to other community
services.
A review was completed however its scope did not allow
for an examination of a changing role for ECCT. This needs
to link with redesign of care at home.
Complete a building appraisal for internal care
homes and develop an overarching care home
and housing strategy. This will include the
position of intermediate care within Argyll and
Bute.
The building appraisal has been completed for internal care
homes and a Short Life Working Group on repairs is looking
to prioritise repairs. Demand modelling was undertaken.
The strategy requires further work.
Complete a needs assessment and collaborative
health and social care plan for Coll, as a template
for island approaches.
This was completed by the Coll Collaborative Group. Key
learning needs to be rolled out to other island
communities. 
Priorities Year 1  Progress
Development of A&B specific Learning Disability
and Autism Strategies, in line with the A&B HSCP
Engagement Framework. 
Initial scoping work was undertaken, however this
required to be paused due to capacity issues. Temporary
post currently advertised to lead on the development and
implementation of Neurodevelopment Strategy with a
full lifespan approach.  
Review and redesign of Learning Disabilities Day Stage 1 of the Review and Redesign on Day Services now           
Learning Disabilities 
Page 166

Page 167

15 
Services across A&B, working in partnership with
H&SC staff, care providers, service users, carers
and wider communities to develop future models
of support. 
complete. Redesign of Staffing Structure for Internal
Registered Services completed in 2022, with remaining
vacant posts currently being recruited to. Stage 2 – the
development of services currently ongoing and will be
carried over to Year 2 and Year 3 as part of the 3 year
action plan for services.
Implementation of the actions set out in the
Learning/Intellectual Disability and autism –
Recovery and Transformation Plan.
This is no longer considered a specific priority for the
HSCP. Any outstanding actions will be considered as part
of the Neurodevelopmental Strategy.
Continue to utilise technology and telecare where
appropriate to increase independence, whilst
ensuring the safety and wellbeing of service
users. 
Ongoing – utilisation of technology and telecare where
appropriate has resulted in the removal of many
sleepover provision across A&B in order to increase
service user independence. 
Priorities Year 1  Progress
Progress planned developments associated with
Transforming Together agenda for mental health. 
Core and cluster has not progressed for mental health
services, this needs dedicated project support and
commissioning to progress.
Community Mental Health Services review and
outcomes. 
The 2018 review outcomes continue to progress such as
developing a Mental Health directorate, Consultant
sector/locality model, developing Primary care teams and
crisis interventions. This agenda was paused through
Covid and will be refreshed to ascertain the aspects and
recommendations remain outstanding.
Psychological Therapies (PT) – we are working
with the Scottish government to develop a
business case to enhance and develop our PT
services across A&B and to assist us to meet the
expectations and demand for services in a timely
and effective manner. The teams are now
realigning to make an A&B wide service under
one management structure to ensure better
oversight of waitlist and service delivery at tier 3
and 4.
We continue to work with the Scottish Government to
develop services and capacity planning to address waiting
times. In the past 2 years we have realigned Psychological
therapies for tier 3 and 4 to develop a team with
appropriate governance, oversight and ownership. We
recruited a Consultant Psychologist and strengthened the
relationship with the Director of Psychology in NHS
Highland. The business case was submitted and we
continue to apply developing capacity models and
standards currently under development.
The primary care mental health team have also
realigned to work across GP surgeries and to
support those presenting with mild and moderate
mental health concerns. This team have a
Multidisciplinary Team approach and have a
wellbeing nurse, Occupational Therapy (OT),
guided self-help worker and primary mental
health worker in each locality.
This is complete and the teams are embedded in each
locality. Helensburgh and Lochside are served via a
Service Level Agreement (SLA), additional resource was
provided to the SLA to secure an OT and wellbeing nurse
within their delivery model. The next stage will be
determined by the Mental Health and Wellbeing in
Primary Care agenda and directives awaited from the
Scottish Government.
Care Reviews.  The reviewing team were required to be redirected to
Adult support and protection, however care reviews and
care packages are under review by our local teams and
through the Care Resource Group process.
Inpatient services – addition of a consultant This Consultant post has just become vacant and in the    
Mental Health 
Page 167

Page 168

16 
psychiatrist for the inpatient unit 3 days per week.
Recruitment of Registered Mental Nurses remains
fragile due to the national shortage and the
inpatient environment holds large vacancies,
support around recruitment and retention 
is well under way across 
NHS Highland. 
process of being re-advertised. We are attempting to
source a locum in the interim period, and cover is being
provided by our sector General Adult Psychiatry 
Consultants. The inpatient ward remains very fragile,
recruitment continues to be very challenging. We secured
retention and recruitment premium of £5k per annum to
offer Band 5 RMNs to maximise recruitment opportunities
alongside the offer of shared accommodation in our
newly refurbed flats, however uptake to date has been
nil. Concentrated targeted communications and
advertising is ongoing to maximise our options.
Additionally, last year we developed our earn to learn
scheme, this scheme is in collaboration with open
university whereby we have recruited new Health Care
Workers specifically to train. This pilot has gained interest
and is being piloted in Tayside also, we hope to offer a
further 3 places this year to continue succession planning. 
Priorities Year 1  Progress
Establish immunisation teams to administer
vaccines in all localities and assess recruitment
priorities based on the impact on workload of
delivering Covid vaccines and the additional flu
vaccine cohorts.
Majority of vaccinations will be carried out by HSCP
nursing teams by March 2023.
Full flexibility for island practices to continue to provide
vaccinations.
Develop an HSCP model for travel health and travel
vaccinations.
Service Level Agreement with community pharmacists
has commenced in some areas.
Recruit to primary care nursing posts as agreed in
the Primary Care Modernisation Implementation
Plan to support community treatment and care and
some aspects of urgent care.
In progress
Implement transitional arrangements where
practices continue to provide some services.
In progress
Provide information of what services will not
transfer from GP practices as an outcome of the
rural options appraisal process. The Scottish
Government and Scottish General Practitioner's
Committee of the British Medical Association
(SGPC) will negotiate a separate arrangement
including funding for these practices who will
continue to provide services after 1 April 2022.
Agreement reached; discussions with the rural practices
ongoing.
Contribute to review of sustainable services on the
island of Coll.
Ongoing    
Primary Care 
Page 168

Page 169

17 
Priorities Year 1  Progress
Post-covid recovery.  All current clinics have recovered, but there remain staffing
pressures due to covid related absence. Staffing levels are
tight, but we remain flexible and will rearrange staffing at
short notice to accommodate clinics. There are rare times
when due to staff illness this is not possible.
Restarting all non-urgent care.  All no-urgent care restarted. Significant waiting times but
in line with rest of Scotland. This has no bearing upon
General Dental Service Provision.
Identification of service needs and associated
development. 
Service need identified: Kintyre and Mid Argyll area. There
is limited provision for Personal Dental Service (PDS)
services in these areas. Redesign of service provision to
allow flexibility and greater provision of dental care in this
region for priority groups.
National Dental Inspection Programme provision, which is
mandated by Scottish Government is challenging. Clinical
staff are being used to fulfil this at present
Development of current services for Island
communities and priority groups. 
Discussion with General Dental Practitioner Islay regarding
contracting to provide PDS careScoping Mobile dental
service (limited provision) and in collaboration with Coll
and Colonsay Communities.
Tiree dentist and DHT visiting Coll regularly. Mull clinic
remains extremely busy. Over 3000 patients registered.
Long waiting list. Only service provider on the island15 of
17 care homes have nominated dentist. (Islay and
Campbeltown – Islay potential for GDP to take over). 
Advanced care options for priority group’s patients –
General Anaesthesia or Intravenous (IV) sedation services
for complex care cases/anxiety cases. Currently no
provision for this within A&B staffing cohort. External
referral to NHSH North or GGC is only route for these
patients. 
Increasing access for patients in assisted and
looked after accommodation settings. 
Domiciliary dental care has resumed. Caring for Smiles
Programme for Care Home staff has resumed. 14 care staff
signed up to take qualification. Oral health care shop to
provide oral healthcare items at cost price to care homes
piloted and successful.
Increase skill mix in association with in-house
training and also NHS Education Scotland
partners. 
AWI training offered to all dentists. A either qualified or
allocated to training. Inhalation sedation training to
Helensburgh, Dunoon and Oban. Associated support staff
identified for training.
Clinicians peer review group meetings – Continuing
Professional Development
Motivation, Action and prompts (MAP) behaviour change and
Oral Health improvement training for all Public Dental
Service sites.
Team building.  Regular team meetings and 1 to 1 meetings as standard.
Senior Management Team to Mull for team building  
Dentistry  
Page 169

Page 170

18 
exercise
Standardising processes.  Single point of referral in final stages with Scottish Care
Information (SCI) gateway
Standard Operating Procedures.
Fixed term recruitment in Orthodontic services.  Unable to recruit. Accessing Consultant services on temp
contract (weekends currently). Looking at agreement with
NHSH North for permanent solution for weekday clinics. 
Scoping of in-house development of SDO for
Orthodontic services.
Senior Dental Officer development underway. Mentoring
by Consultant in NHSH North
PAYs in establishment take to advert to increase
staffing numbers. 
Complete. Meeting with finance in 2 weeks to review.
Capital funding application for service
improvements.
Capital funding applications being prepared Tiree, Mull,
Mobile Dental equipment.
Co-located sites, increase communication with
corporate bodies and GDP services.
Lines of communication open to facilitate good working
relationships. 
Priorities Year 1  Progress
The ADP strategy.  The work of the ADP is informed by a strategy that
covers the period of 2020-2023. The strategy has 4
pillars:
1. Prevention and early intervention
2. Developing recovery-oriented systems of care
3. Getting it right for everybody
4. Public health approach to justice
Updates on some of the work covered under this
strategy is provided below however the majority of
updates are provided under the remaining ADP
priorities below. 
Planet Youth
The ADP provided funding for two secondary schools
to take part in the Planet Youth approach to
substance use prevention through a community
collaborative approach. Planet Youth surveys were
used to inform strategies within each of the schools
and communities. This baseline data is important for
measuring the impact of this approach and will allow
schools to identify priority areas for development. 
This work is ongoing and additional funding will allow
this to be rolled out to further secondary schools. 
S3 Drama “You Are Not Alone” 
The ADP continues to contribute funding to the S3
Drama which is delivered across secondary schools in
Argyll and Bute.  This has continued to be delivered
via a filmed performance. The performances provide
an opportunity for young people to engage in          
Alcohol and Drug Partnership (ADP)
Page 170

Page 171

19
questions, understand support that is available and
connect with other services.  Planning for the return
of the live performance for March 2023 is already
underway.  The ADP also offer professional learning to
education staff in relation to substance misuse to
support staff in the development of high quality and
relevant PSHE programmes. 
The ADP work in line with the strategy and a strategy
refresh for 2023-2024 is being developed following a
successful ADP strategy day in February 2023.
Initiate MAT standards.  The Drug Deaths Taskforce was set up in September
2019 and prioritised the introduction of standards for
Medication Assisted Treatment (MAT).  The aim is to
reduce deaths, and other harms and to promote
recovery.  The standards provide a framework to
ensure that MAT is sufficiently safe, effective,
acceptable, accessible and person centered.
In discussion with the MAT standards Implementation
Support Team (MIST), partners produced a project
specification document to initially implement MAT in
Cowal & Bute.
Dedicated co-located teams will work in partnership
to provide appropriate and evidenced access to
medication assisted treatment that promotes harm
reduction and a whole person approach.
The MAT steering and implementation groups
continue to meet regularly to progress the
implementation of the standards in Cowal and Bute. 
Learning from this will be used to scope roll out to
other Argyll and Bute areas, a process which is
supported by Public Health Scotland and Healthcare
Improvement Scotland.
Increase access to residential rehab.  A new residential rehabilitation pathway has been
developed for use in Argyll and Bute, to support those
seeking residential rehabilitation and/or
detoxification. This was developed via a Residential
Rehabilitation Group, which was formed to ensure all
partners who would be involved in care and support
before and after residential rehabilitation would be
involved in the discussions to enable clients to
maintain the benefits of residential rehabilitation. 
This is a partnership of third sector, NHS and Council
member.  Historically referrals to residential
rehabilitation were made only to Phoenix Futures in
Glasgow and Kings Court in Tighnabruaich, the
number of organisations that can be referred to has
increased.
The pathway encourages pre and post rehabilitation
Page 171

Page 172

20
support to maximise support for the individual. In
financial year 2021-22 eighteen people were
approved for residential rehabilitation and/or
detoxification, twelve were men and six were women.
Develop a revised approach for children and young
people’s support. 
The existing school-based support service continued
to deliver throughout 2021/22.  There was evidence
that the interventions resulted in improvements in
young people’s lives and had a positive impact on
families.
A needs analysis was carried out in 2021 by an
independent organisation to map and match current
service, identify service gaps and adapt or commission
new services to meet the identified needs of young
people across all communities.  Work is ongoing to
respond to the needs identified.
Initiate the whole family approach strategy.  Argyll & Bute’s first Family Support group was
established, with the support and funding from the
ADP, in Helensburgh in October 2018 by two family
members with experience of caring for and living with
someone with drug and/or alcohol dependency
issues.  With their support, a second group was
established in Dunoon. Work is ongoing to implement
the Whole Family Approach across all localities of
Argyll and Bute.
Increase access to advocacy.  A partnership was established by the ADP involving
Lomond & Argyll Advocacy Service, Scottish Recovery
Consortium and Reach Advocacy to train people with
lived experience as Peer Advocates (recovery
advocacy peers).  The partners successfully recruited
and trained 4 individuals from across Argyll and Bute
as Lived Experience Advocates.  All four successfully
completed the Reach Advocacy Rights Based
Approach SQA Advocacy Award. Advocates work
closely with the substance use support teams in
localities supporting the needs of their communities
and encourage people to access the types of supports
that enable their recovery journeys.
Lomond and Argyll Advocacy Services will play an
important role in the delivery of MAT Standards in
Argyll and Bute and the recovery advocacy Team will
also all complete interview training, interviewing
service users about their experiences of MAT.                                           
The Group Recovery Advocacy’s work has been
valuable and the voices of people in recovery have
helped shape some developments and improvements
within Argyll.  
Scottish Recovery Consortium aim to establish a
Page 172

Page 173

21 
National Network of Peer Advocacy Services and will
look to Argyll and Bute as a model of good practice. 
The combination of national and local based partners
helped secure the funding for this project and it is
hoped the establishment of a National Network will
help develop and support this service as we move
forward.
Work with criminal justice to create a continuation of
shared care. 
The ADP, in partnership with Community Justice,
Criminal Justice, Police Scotland and We Are With
You, established a Police Custody to Community
pathway for people who wished to speak to a
member of staff from We Are With You.
The offer of support is not limited to those with
identified needs associated with their use of alcohol
or drugs but, by using the ADP Recovery Orientated
Systems of Care (ROSC), can link into a wide range of
services and opportunities.  We Are With You function
as a first point of contact and link people into the
appropriate service providers on their release from
custody. 
A pathway has been developed to allow continuation
of care and Opioid Substitution Treatment (OST) for
someone who is entering prison.  If an individual is
admitted to prison, there is contact between the
prison and the service prescribing OST to confirm
both the prescription and the willingness of the
service to continue this on release.  Due to the
challenges of the pandemic, this pathway requires
review.
The ADP and Community Justice continue to work on
the development of the pathways for those people
leaving Prison and returning to Argyll & Bute.  Central
to this is the need to ensure all are provided with
Naloxone on liberation and continuity of care where
OST is prescribed.  Argyll & Bute prisoners can be held
in a range of prisons and work is ongoing to ensure an
equitable approach.  Prior to release from prison,
contact is made to substance use service providers in
order to continue with any clinical treatments in the
community. This has worked well for the continuation
of prescribed methadone and buprenorphine.
Page 173

Page 174

22 
Priorities Year 1  Progress
Continue to develop standard tools and process
for establishment setting ready for cycle three.
Agree establishments for A&B teams. 
First cycle reported to SLT and supported with investment
and service redesign requirements over next year. Cycle
two planned spring 2023. Health & Care Staffing Act
implementation in 2024.
Develop a dashboard for visible demand and
activity data for AHP teams. 
Work underway with Performance Management Team.
IMPF submission for AHP’s complete.
Working on process for collating all AHP minimum data
for analysis.
Work with MS365 for daily activity App
Scope offer of first contact physiotherapy to
remote and rural practices.
Project progressed with fixed-term band 7 physio to
establish plans for smaller practices. Currently 16 out of
31 practices have FCP service which is 80% of Argyll and
Bute’s total Population
All AHP staff to do Health Behaviour Change
training and review the professions offer to
prevention.
Training offered, 6 AHP attended, plan in place to recruit
further staff for TURAS module.
Service pressures have impacted.
Review of recruitment within AHP professions and
enhance skill set opportunities g. Increase
number of advanced practice roles, therapy
assistant support to qualify as an AHP. 
New admin & assistant roles being trialled in Occupational
Therapy, Podiatry, Learning Disabilities and Paediatrics.
No progress with work-based professional
apprenticeships due to national issues. Increasing number
of overseas recruits. 
Priorities Year 1  Progress
Continue to work closely with our Carer Centre
Services to deliver on A&B Caring Together Strategy.
We continue to meet regularly, attend training and
development events.
We will develop a Carer APP which will assist in the
sharing of information and provide guidance to
carers. 
Young Carer App developed and now in use.
There will be a learning and development plan to
support implementation and knowledge of the
Carers (Scotland) Act.
In progress
There will be multi-agency guidance for our
workforce on identifying, supporting, listening to
and involving Carers during the planning of services
and recognising their involvement as an equal
partner in care. This will include guidance on how we
communicate and work together.
Developed and out for feedback. Will be in place by end
of April.
Develop and implement processes to ensure that
Carers Support Plans, Young Carers Statements, and
Emergency Plans are completed, and the
information is shared across all services as agreed.
Completed
We will increase Communication and engagement;
ensuring carer’s voices are heard. Produce an
In Progress      
Allied Health Professionals (AHP) 
Carers 
Page 174

Page 175

23 
Engagement framework.
We will work collaborative with Carers and Carer
centres to create a Carer Pathways. 
Completed
We will work to develop guidance to support carer
visibility and involvement prior to hospital discharge.
Completed , Poster, Leaflets
Review and update of our Caring together strategic
plan.
Delayed as awaiting the new National Carer Strategy. 
Increase our involvement with education and raising
Young carer Awareness.
Brought forward from year 2 completed. 
Priorities Year 1  Progress
Establish Health Behaviour Change training within
the HSCP. 
Health Behaviour Change training has been rolled out 
Communication & engagement plan developed and
rolled-out. 
Changed to Co-production of Community assets
(Strand 2 of programme) 
A co-production plan has emerged with partners in Live
Argyll, Argyll & Bute Council, MacMillan & Third Sector
Interface. We are engaging with Living Well Networks and
Locality Planning Groups. Co-production planning is
arranged top focus on delivery of the Living Well Strategy
priorities with a focus on building community assets.
Collate ideas to increase prevention and early
intervention in preparation for National Care
Service roll-out. 
(Strand One of programme) We have drafted an options
appraisal around developing a 12 week Wellbeing &
Physical Activity programme and are progressing to
exploring funding opportunities. 
Priorities Year 1  Progress
Implement the new ECLIPSE IT system and increase the
number of community health staff using the single
health and social care IT system.
On course for completion May/June 23.
Join up our HSCP teams by improving NHS systems and
Council systems for easier data sharing. Enhance
communication and collaboration using MS Teams
federation.
Phase 1 of federation completed. Provides instant
messaging, calendar access and presence
management. Phase 2 of this national project
timescale still to be agreed
Complete the final phase of our “Drone” beta service
for clinical logistics in the West of Argyll leading
national innovation in the use of this technology in the
Scottish Health service. 
Phase 1 and 2 complete. Phase 3. In essence this is a
6 month “Beta test” with a live logistics delivery
service programme. This would be the final stage of
establishing the integration of “beyond visual line of
sight” (BVLOS) drones into our normal clinical
logistics transport network.      
Digital Health and Care Strategy 
Prevention Programme 
Page 175

Page 176

24 
Priorities Year 1  Progress
Work on finding a digital solution within the pilot
area. 
Digitally ready devices are being rolled out both as and
when clients switch to a digital line and for all new
clients in the Oban and Mull areas. 
Continue to promote digital care across the HSCP
ensuring no digital exclusion in Argyll & Bute. 
We continue to promote our service utilising
newsletters, roadshows etc and working alongside
colleagues to ensure familiarity with digital care
solutions available. Digital exclusion is still an ongoing
issue and will be nationally, we know for some of our
more remote residents eg those living on the islands
this is a risk and we are working with the LPGs, Living
Well Coordinators etc to ensure this is minimised.
Ensure TEC is a core service embedded in all aspects
of delivery of care. 
We are working to ensure TEC is wrapped round our
patients and clients at every stage of care delivery. We
have Technician presence at MDTs, virtual ward
meetings etc. we are cross referencing hospital
admissions with TEC clients, which allows us to
prioritise those most in need. 
Encourage promotion of all services throughout
patients/clients journey. 
We recognise the changing need of patients and clients
as they journey through services, we are working to
promote remote health monitoring across primary
care, TEC based solutions when patients require
secondary care and ensure this support is ongoing.
Supporting colleagues to feel more comfortable
using TEC available as a resource to support their
delivery of care and free up time for direct patient
care. 
We continue to work to upskill colleagues to work with
TEC. Examples of this are the work we are doing to
address those on the unmet need list, working with the
Mental Health teams to direct referrals into the
Silvercloud programme. Frequent callers will be
highlighted.
Continue to develop NHS Near Me clinics to support
clinicians in delivering remote clinics and supporting
patients to attend appointments without the need to
travel. 
We are promoting the use of Near Me wherever
possible, working with the islands in particular as part
of the Digital Hub development. Promotional materials
are being heavily utilised to increase awareness of the
option to have consultations and appointmens via Near
Me, especially when these are to occur in Glasgow
sites. 
Priorities Year 1  Progress
Identify estate rationalisation opportunities as part of
Councils “Our Modern Workspace” project. 
This work is ongoing within the Council with the creation
of “Working from Home” policies to support new ways of
working.
Implement the new ECLIPSE IT system and increase the
number of health staff using the single health and social
care IT system.
On course for completion May/June 23.
Join up our HSCP teams by improving NHS systems and Phase 1 of federation completed. Provides instant     
Technology Enabled Care (TEC) 
Coporate Services   
Page 176

Page 177

25
Council systems for easier data sharing. Enhance
communication and collaboration using Microsoft Teams
federation.
messaging, calendar access and presence management.
Phase 2 of this national project timescale still to be agreed.
Obtain funding and expand our electric vehicle charging
point infrastructure by 30 and our electric vehicles by 35.
The HSCP will have installed 30 additional charging points
across A&B and has placed an order for 53 Electric
vehicles.
Complete the final phase of our “Drone service” beta
service for clinical logistics in the West of Argyll leading
national innovation in the Scottish Health service. 
Phase 1 of this project, a proof of concept, was conducted
in June 2020 Phase 2 piloting a “live” service in February to
May 2021 covering Mull and Iona Community Hospital,
Easdale Surgery, Mid Argyll Community Hospital and
Integrated Care centre Lochgilphead and Lorn and Islands
Rural General Hospital Oban. Following the success of
these previous phases, the Unmanned Drone Logistics
project is moving to its final critical test stage – Phase 3. In
essence this is a 6 month “Beta test” with a live logistics
delivery service programme. This would be the final stage
of establishing the integration of “beyond visual line of
sight” (BVLOS) drones into our normal clinical logistics
transport network. Skyports has obtained funding from
the European Space Agency and the UK Space Agency to
operate this service under a “Transponder Mandatory
Zone” (TMZ) airspace structure which would be the first in
the UK to be used for BVLOS medical deliveries. What this
means is that crewed and un-crewed aircraft such as the
drones operating in this project can fly together in
unsegregated airspace. This allows us to move away from
restricted air corridors which other aircraft cannot access
while greatly improving the integration of un-crewed
aircraft into current airspace structures. This integration
piece is the crucial ‘unlocker’ of permanent BVLOS drone
medical deliveries in the UK.
Page 177

Page 178

26
Performance Management and
Governance 
Introduction
This year has seen the move from the post-COVID remobilisation of services using the
designated Framework for Clinical Prioritisation to focussing on the management and
reduction of Long Waits and preparation for winter pressures.  From October onwards
health and social care services across Scotland experienced an extensive increase in the
prevalence of Flu, Covid19 in addition to expected winter illness and system pressures. 
As such the Scottish Government Health Department directed HSCPs to focus on additional
actions and performance measures to look at the impact of additional funding and address
these pressures. A National Response Group was established to monitor and drive
improvement with regards to the reduction of Delay Discharge across Scotland to support
the acute inpatient pressure and enhance flow patient through hospitals. Both HSCPs and
Health Board were required to adopt five key action areas to address these pressures,
alongside monitoring and reporting of additional performance measures to evidence impact
and support progress.
The five areas of focus were:
1. Delivering a different model of care for a short period, e.g. move to critical/life-
saving care only and postponing planned activity. 
2. Opening / procuring additional capacity in social care e.g. intermediate care beds. 
3. Moving staff to areas of pressure across acute and community and care services. 
4. Increased engagement with 3rd sector providers commissioning enhanced services
to address unmet care need and prevent admission. 
5. Lighter touch governance arrangements with regard to criteria for discharge and
inspections 
Integrated Performance Management Framework (IPMF)
The focus for 2022 has been the development of the Integrated Performance Management
Framework to ensure that the drivers for performance improvement are those that matters
most to the service both operationally and strategically.  The overall focus of the IPMF was
to establish a collaborative performance framework that offered improved performance
visibility across the HSCP and real ownership. This steps away from previous traditional
management of performance and replaces the Pyramid Balanced Scorecard, the IPMF is
scheduled to go-live in April 2023.  The new governance arrangement will mean that future
performance reporting will be scrutinised by the Clinical & Care Governance Committee
Page 178

Page 179

27
The monitoring and reporting of performance using the IPMF ensures the
HSCP is able to deliver against key strategic priorities, national data
demands and the Strategic Plan objectives and service priorities;
Key Performance Overview  
This overview uses calendar year (Jan- Dec) for 2022, this ensures that there
is data continuity linking previous and new reporting using full year data. Latest
performance against the IJB Scorecard measures is presented at Appendix 1. Note this is
impacted by unavailability of data – we are awaiting advice from Public Health Scotland
(PHS) on the publication and use of National Indicators reported within the Health and
Wellbeing Outcome Indicators (HWBOI) and Core Suite data. PHS has confirmed 2022
update will not be available until Jun 2023 earliest. PHS also advise that Ministerial
Steering Group data is impacted by Scottish Morbidity Record (hospital episode /
admission records) completeness across a six month lag period, therefore any data
reported within this lag period should be treated with caution. 
Benchmarking
Benchmark performance makes a comparison with the seven identified rural HSCP’s and
against the Scottish average. Performance across the 20 HWBOI, Argyll & Bute HSCP noted
** (**%) indicators performing above the Scottish average. Performance against the other
HSCP’s for these indicators notes that Argyll & Bute had an overall **% success rate
(Appendix 2) 
** Note we are awaiting further advice from PHS on publication and use of National
Indicators reported within the HWBOI and Core Suite data. PHS has confirmed 2022
update will not be available until Jun 2023 earliest. 
Waiting Times & Long Waits
On average the overall number of people on the Out Patients Waiting List (OPWL)
has seen an increased by 36% across 2022 against previous years data. This is
show in terms of a monthly increasing trend across the year, with the lowest
recorded in February (n=1268) against a peak of (n=2130) for December   
Across 2022 the overall number of people on the OPWL breaching beyond 12 weeks has
increased by 150% for 2022 against previous years data. This is represented by monthly
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 1364 1268 1500 1466 1627 1783 1926 1866 1870 2035 2026 2130
2021 1266 1211 1122 1290 1259 1287 1316 1311 1314 1357 1284 1323
0
500
1000
1500
2000
2500
New OPWL - 2021 & 2022
2022 2021 Linear (2022)
Page 179

Page 180

28
increasing trend across the year, with the lowest recorded in February (n=286) against a
peak of (n=750) for December. 
The overall number of people on the OPWL Long Waits breaching beyond 52 weeks has
decreased by 69% across 2022. This is reflected by a monthly decreasing trend across the
year with a peak of (n=13) for January and the lowest recorded point in December (n=4). 
Homecare
For  2022 there was a 2.7% increase across the year with regards
to the total number of homecare hours against the previous year,
this was offset with a slight reduction in the average number of
homecare clients in receipt of a service. Peak months for the
delivery of the homecare hours were March to July with a
reducing trend from July (n=103,574) to November (n=95,841). 
Trend analysis for 2022 with regards to overall number of
homecare clients in receipt of a service noted an increasing trend from February (n=1481)
peaking in July & August (n=1588). From August there is a rapid decrease in the overall
number dropping to (n=1482) in December. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 300 286 317 335 369 435 448 415 504 563 579 750
2021 471 427 299 302 272 245 244 277 311 323 276 309
0
200
400
600
800
New OPWL Breaches > 12 Weeks - 2021&22
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 1,509 1,481 1,494 1,510 1,534 1,548 1,558 1,558 1,525 1,522 1,492 1,482
2021 1,550 1,534 1,549 1,525 1,517 1,522 1,499 1,513 1,516 1,519 1,514 1,509
1,400
1,450
1,500
1,550
1,600  
Number of Homecare Clients 2021 & 2022
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 13 6 6 4 9 10 10 9 5 4 7 4
2021 98 105 93 84 78 56 47 48 36 35 22 17
0
50
100
150
OPWL Long Waits  > 52 Weeks - 2021&22
2022 2021 Linear (2022)
Page 180

Page 181

29
Residential Care
Performance with regards to the total number of people in residential
care notes a relatively flat trend for 2022, with an overall 2% reduction in
the total number of people in a care home against previous year
performance. June to September suggests some potential seasonality in
the data with this year and the previous year sharing a reducing trend
across October to December 
Delayed Discharge
Delayed discharge performance for 2022 notes an increasing trend across
the year with a 53% increase in the average number of delays when
compared against data for 2021. Alongside this was a 66% increase in the
average bed days occupied by those delays.  Monthly performance noted
seasonal increases in March, October and December, this pattern is
replicated in the 2021 data. Statistically across each month the increase in
bed days occupied was not directly attributable to an increase in the overall
number of delays, peak months were July, October and December.  May
and June noted a small increase in the number of delays but with a
significant increase in the time beds were occupied. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 549 554 570 564 563 557 552 561 564 574 559 557
2021 598 594 611 611 569 548 558 556 557 553 556 546
500
520
540
560
580
600
620
Number of People
Months
Number of Care Home Residents 2022 & 2021
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 478 388 434 419 435 475 734 687 586 894 663 860
2021 413 197 246 141 112 241 315 363 324 535 287 370
0
200
400
600
800
1000
Bed Days Occupied in Month 2021 & 2022
2022 2021 Linear (2022)
Page 181

Page 182

30
Adult Support & Protection
From the most part duty to enquire activity noted a very similar trend as the
previous year, with a variance increase in 2022 from May to August.  This
increase in activity was recovered from September onwards with both years
noting a slight decreasing trend for November to December.  On average duty
to enquire activity was reduced by 13% for 2022 as compared to 2021 and
with regards to Investigation and Risk Assessments completed, notes a 5%
increase for 2022 against the previous year. 
Resilience in Care at Home (Unmet Need) 
The reporting of unmet need commenced in August 2021 in line with a
weekly requirement from the Scottish Government. Part of this return
looks at the number of people waiting for a care package and the
associated hours. Average data for 2022 across the number of people
noted (n=64) for the year against an average of (n=591) hours.
Comparison with the previous year 2021 is limited due to the part year
data available. The trajectory for the number of people waiting noted a
slightly increasing trend, however there is not a strong correlation with
increasing weekly numbers of people and increases in associated care
hours.   
0
200
400
600
800
1000
3-Jan 3-Feb 3-Mar 3-Apr 3-May 3-Jun 3-Jul 3-Aug 3-Sep 3-Oct 3-Nov 3-Dec
Hours
Months
Number of People  & Hours of Care 2022
Number of people Hours  Linear (Hours )
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 19 36 32 30 21 31 39 45 23 29 49 32
2021 20 36 32 24 24 20 23 28 32 27 42 27
0
20
40
60
Numbers
Months
Adult Support & Protection- Duty to Enquire 
2021& 22
2022 2021 Linear (2022)
Page 182

Page 183

31
Children & Families
Overall numbers of assessments completed for 2022 noted a 7% reduction, with
a relatively flat trend across the year.  The data notes variance across the year
and an erratic and reducing monthly trend from May onwards. There is a
suggested impact of seasonality with regards to a reduction in activity across
school holiday time, June and July.
With regards to the overall number of Care Experienced Children there was a 6% reduction
for 2022 against the previous year average.  Monthly trend analysis noted for 2022 an
increasing overall trend from June onwards, peaking in August with a relatively flat
performance up to and including December.   
The numbers of children on the child protection register noted a
decrease against previous year activity.  The average for 2022
noted a 35% reduction against the data for 2021, with a drop in
activity across June & July, suggestive of seasonality and potential
impact of school holidays.  The data identified four distinct
periods of increased numbers of children on the register across
the year February (n=35), March (n=28), May (n=29) and August
(n=27), although general monthly numbers remain statistically
low.  February notes the highest number of children registered, against (n=21) in November.
Initial contacts data identified a reducing trend for 2022 against previous year, this equates
to an overall reduction of 12% against 2021 data. The data for 2022 noted an erratic
monthly trend with the most significant reduction in contacts from May (n=319) to (n=90) in
December. This trend is in direct opposition to the previous increasing monthly trend for
2021 data. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 146 146 143 145 144 143 147 151 147 145 143 145
2021 164 161 159 157 156 150 152 151 150 151 151 147
130
140
150
160
170
Number of Care Exeperienced Children 
2021 & 22
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 33 35 28 27 29 24 22 27 25 22 21 22
2021 30 40 45 37 34 35 32 35 37 38 42 37
0
20
40
60
Number of Children on the Child Protection
Register- 2021 & 22
2022 2021 Linear (2022)
Page 183

Page 184

32
Community Health
The number of community assessments commenced in the month noted
a gradual increasing trend for 2022, with an average overall yearly
increase (8.5%) in the number of assessments commenced against data
for 2021.  Trends across the months highlighted the highest number of
assessments were in May (n=12,251), this is a 1.4% increase against the
highest recorded monthly number (n=12, 076) in 2021. Previous volatility
in the monthly 2021 data is offset by a more stable baseline in 2022. 
Adult Care
Adult care initial contacts noted an average reduction of 18%
against data for 2021, this was countered by a general
increasing monthly trend peaking in November (n=496) from
a baseline of (n=322) in January.  Trend analysis across both
2022 and 2021 noted more stability for 2022 against an
erratic decreasing data trend of 2021.  Conversion of initial
contacts to assessments highlighted a 24% overall average reduction for 2022 against the
previous year.  The trend across the year was relatively flat in trajectory, peaking in March
(n=263). 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 322 361 429 387 438 405 410 410 402 445 496 360
2021 632 641 645 481 573 427 455 504 344 384 411 333
0
100
200
300
400
500
600
700
Adult Care Initial Contacts 2021/22
2022 2021 Linear (2022)
0
5,000
10,000
15,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Community Assessments Commenced in the
Month  2021 &22
2022 2021
Page 184

Page 185

33
Technology Enabled Care & Falls 
Telecare performance for 2022 noted a 1.5% increase against the
previous year performance with regards to the actual number of
clients in receipt of a service. From Jan- May the overall trend was
flat, from June there was a sustained increase in numbers peaking at
(n=1955) in October against (n=1906) for the same month in the
previous year. 
On average the overall number of falls recorded within the context of a Technology Enabled
Care response reduced by 6% for 2022 against previous year data. The drop in overall
reporting was against a monthly increasing trend across the year with the lowest recorded
in January (n=46) against a peak of (n=83) for December. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 1921 1922 1910 1918 1917 1945 1942 1953 1947 1955 1951 1952
2021 1898 1916 1915 1930 1880 1906 1920 1924 1915 1906 1915 1922
1840
1860
1880
1900
1920
1940
1960
1980
Number of Clients in Receipt of Telecare 
2021 & 2022
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 46 63 65 67 55 55 80 78 61 67 69 83
2021 69 77 94 88 68 76 67 72 60 63 46 59
0
20
40
60
80
100
Telecare Recorded Falls- 2021&22
2022 2021 Linear (2022)
Page 185

Page 186

34
Child & Adolescent Mental Health & Psychological Therapies
Whilst CAMHS performance for the year 2022 noted an overall reduction of 14% of people
on the waiting list compared with 2021, there has been an increasing trend in the latter part
of 2022, with months Sep-Dec reporting 53% increase against the August low point. 
On average the overall number of children on the CAMHS waiting list fell
by 14% for 2022 against previous year’s data. The drop in overall
reporting is against a monthly decreasing trend across the year with the
lowest recorded in August (n=71) against a peak of (n=263) for May. This
decrease reflects a period of systems data cleansing with a focus on
legacy PMS system recorded waits. 
On average the overall number of waits for Psychological Therapies rose by 19% for 2022
against previous years data. Overall reporting indicates a monthly decreasing trend across
the year with the lowest recorded in December (n=244) against a peak of (n=304) for
February
Winter & Systems Pressures
Since Jan 2023, Winter & Systems Pressures have been monitored in line with the SG
Integrated Performance Framework focussing on Resilience in Adult Social Care, looking
closer at patient flow through Urgent & Unscheduled Care, increased support for Interim
Care Home Placements, and improving the rate of Discharges without Delay. Argyll and
Bute’s current performance in these areas is presented in Appendix 3. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 212 239 224 257 263 168 142 71 90 97 101 109
2021 188 169 188 150 181 187 186 196 230 244 191 207
0
50
100
150
200
250
300
CAMHS - 2021&22
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 293 304 291 294 294 288 296 290 289 266 244 244
2021 173 186 202 254 265 288 184 218 206 219 261 290
0
50
100
150
200
250
300
350
Psychological Therapies 2021&22
2022 2021 Linear (2022)
Page 186

Page 187

35
Financial Performance and Best Value 
Financial Performance
The IJB is committed to the highest standards of financial management and governance. It is
required to set a balanced budget each year and seeks to deliver Health and Social Care
Services to the communities it serves within the envelope of resources available to it.
Financial performance is reported in detail to the IJB at each of its meetings and to its
Finance and Policy Committee which meets on a monthly basis. It also publishes its Annual
Report and Accounts which are subject to independent external audit. 
This section provides a summary of financial performance for 2022-23, our approach to
ensuring that we deliver Best Value and outlines the future financial outlook and perceived
risks.
Financial Performance 2022-23
The IJB set a balanced budget for 2022/23, and is delighted to be able to report an
underspend against the resources made available to it during the year. This is an excellent
outcome as it enables the HSCP to progress key Transformation projects and importantly
helps it manage the financial challenges facing the health and social care sector in future
years. It is acknowledged that a number of factors contributed to this improved position
including delivery of savings, improved financial management and governance and
additional funding allocations from the Scottish Government. It is also the case that the
HSCP has continued to experience difficulties in recruiting staff during 2022/23 which has
contributed to the positive financial position but has resulted in on-going service challenges.
The final revenue outturn for 2022/23 was an underspend of £9.1m against the resources
available to the HSCP, which totalled £341m. This underspend has been retained by the
HSCP within its general reserve and it is intended that it will be invested in 2023/24 on
service transformation and will enable to HSCP to cover its budget gap in 2023/24 from
within its own resources. The following table summarises the financial performance against
budget analysed between Health and Social Work related services. 
Service Actual 
£
Budget
£
Variance 
£
Variance 
%
Social Work Services 89,184 92,740 3,556 3.8%
Health Services 242,496 242,497 5,542 2.2%
Grand Total 331,680 340,778 9,098 2.7% 
The budget for 2022/23 included a savings target of £6.1m, of this target £4.2m or 68% of
the savings programme was delivered.  This mean there are a number of savings projects
that the HSCP requires to deliver in 2023/24. It continues to manage its savings programme
rigorously and is committed to service transformation and to ensuring the sustainability of
the services it offers and its longer term financial sustainability. The HSCP has a new savings
target of £6.8m for 2023/24, delivering this, as outlined in the Value for Money Strategy, is
in addition to delivery of the £1.9m of savings not achieved in 2022/23. The HSCP has also
identified a number of other Value for Money priorities within its strategy including work
relating to the funding model for rural and island communities. 
Page 187

Page 188

36
Financial Outlook, Risks and Plans for the Future
The IJB has a responsibility to make decisions and direct service delivery in a
way which ensure it operates on a financially sustainable basis within the finite
resources available to it. There are significant on-going cost and demand
pressures across health and social care services as a consequence of demographic change,
new treatments, increasing service expectations and on-going high inflation. Managing
these pressures and funding uncertainty is becoming increasingly difficult, the real value of
budgets continues to be eroded by price and cost increases. There is on-going requirement
to improve efficiency, deliver savings and transformation plans. 
The HSCP continually updates its forward financial plans to recognise and plan for the
impact of new policy priorities, emerging cost pressures and funding allocations.
Additionally, robust risk management processes are in place which seek to identify and
quantify the financial risks facing the HSCP. Key risks currently facing the partnership include
the sustainability of service providers, the impact of inflation, staff availability and costs, and
increasing demand for services. A further key risk is in respect of the increased numbers of
people who are awaiting diagnosis and treatment. 
The Annual Report and Accounts for the year provide further detail and analysis in respect
of financial performance, financial risks and governance arrangements and improvement
plans. 
Best Value 
The IJB has a statutory duty to provide best value as a designated body under
section 106 of the Local Government (Scotland) Act 1973. NHS Highland and
Argyll and Bute Council delegate funding to the Integration Joint Board (IJB).
The IJB decides how to use these resources to achieve the objectives of the
strategic plan. The IJB then directs the Partnership to deliver services in line
with this plan. 
The governance framework represents the rules and practices by which the IJB ensures that
decision making is accountable, transparent and carried out with integrity and in line with
the principles of public service. The IJB has statutory responsibilities and obligations to its
stakeholders, staff and residents of Argyll and Bute. 
The Health and Social Care Partnership ensures proper administration of its resources by
ensuring that there is an appropriate governance framework in place and by having an
appointed Chief Financial Officer who is required to keep proper accounting records and
take reasonable steps to ensure the propriety and regularity of the finances of the
Integration Joint Board. The IJB is also required to publish audited annual accounts each
year. 
Best Value underpins the ethos of governance and financial management within the IJB, a
summary of performance against the 8 best value themes is given overleaf: 
Page 188

Page 189

37 
Page 189

Page 190

38 
Page 190

Page 191

39
Appendices 
Appendix 1 IJB Scorecard 
(Note comments re availability of NI Indicators for 2022 and MSG completeness)     
Outcome 1 - People are able to improve their health 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-1 - % of adults able to look after their health very well or quite well  93.0%  93.0% 93.2% 90.8% 90.8% 90.9%
NI-3 - % of adults supported at home who agree they had a say in how their
support was provided    76.0%   76.0% 72.5% 66.9% 66.9% 70.60%
NI-4 - % of adults supported at home who agree that their health & care
services seemed to be well co-ordinated   72.0%  72.0% 73.7% 66.0% 66.0% 66.40%
NI-16 - Falls rate per 1,000 population aged 65+   26.0  23.0  25.3 27.8 27.8 23
A&B - % of Total Telecare Service Users with Enhanced Telecare Packages  45.7% 45.6% 43.2% 41.2% 31.0%
NI-13 - Emergency Admissions bed day rate  108883 109,759  94,863 104,253 104,253 109,429
Outcome 2 - People are able to live in the community 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
*MSG 1.1 - Number of emergency admissions - A&B  9,003 9,111 7,563 8,343 8,396 8,509
*MSG 2.1 - Number of unplanned bed days acute specialties - A&B  67,060 66,706 55,378 65,475 71,325 57,139
*MSG 2.2 - Number of unplanned bed days MH specialties - A&B  14,623 12,676 12,732 9,868 9,306 15,896
*MSG 3.1 - Number of A&E attendances - A&B  16,912 17,784 12,671 17,114 20,283 16,960
*MSG 6.1 - % of 65+ population  at Home (unsupported) - A&B    8.0%   7.9% 7.9% 7.5% 7.5%  8.1%
A&B - % of LAC who are looked after at home or in a community setting 82.4% 80.6% 83.6% 87.0%  90.0%
Outcome 3 - People have positive service-user experiences 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-2 - % of adults supported at home who agree they are supported to live as
independently    79.0%   79.0% 79.9% 75.0% 75.0% 78.8%
NI-5 - % of adults receiving any care or support who rate it as excellent or good   80.0%  85.0% 78.3% 68.6% 68.6% 75.3%
NI-6 - % of people with positive experience of their GP practice   85.0%  85.0% 84.5% 77.6% 77.6% 66.5%
*MSG 3.2 - % A&E attendances seen within 4 hours - A&B  93.4% 91.7% 93.1% 88.9% 83.3% 95.0%
CA72 - % LAAC >1yr with a plan for permanence 65.0%  85.2% 65.4% 67.1% 95.2%  81.0%
Outcome 4 - Services are centred on quality of life 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-7 - % of adults supported at home who agree their support had impact
improving/maintaining quality of life   74.0%  74.0% 76.50% 76.7% 76.7% 78.10%
NI-12 - Rate of emergency admissions per 100,000 population for adults  12,678 11,353 10,790 11960 11960 11,636
NI-14 - Readmission to hospital within 28 days per 1,000 admissions  87.0  76.0 91.0 91.0 91.0 110
*MSG 5.1 - % of last six months of life by setting community & hospital - A&B  90.0% 90.8% 92.40% 90.8% 90.8%  90.0 %
A&B - % of Waiting Time breaching >12 weeks 21.0% 38.0% 22.0% 37.0%  25.0%
IJB Perfomance Scorecard for Annual Performance Report
Page 191

Page 192

40 
Outcome 5 - Services reduce health inequalities 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-11 - Rate of premature mortality per 100,000 population  393 403 398 386 386 465
NI-17 - % of SW care services graded ‘good’ '4' or better in Care Inspectorate
inspections    86.0%   84.1% 87.1% 80.0% 80.0% 75.8%
NI-19 - No of days people [75+] spent in hospital when ready to be discharged,
per 1,000 population  640 540 346 584 584 761
CPC01.4.4 - % Waiting time from a patient’s referral to treatment from CAMHS 91.0% 92.5% 100.0% 80.0% 84.6% 90.0%
AC21 <=3 weeks wait between SM referral & 1st treatment 90.5% 91.3% 84.9% 80.0% 75.0% 90.0%
Outcome 6 - Unpaid carers are supported 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-8 - % of carers who feel supported to continue in their caring role   33.0%   33.0% 35.0% 38.0% 38.0% 29.7%
Outcome 7 - Service users are safe from harm 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-9 - % of adults supported at home who agree they felt safe    83.0%   83.0% 78.7% 76.4% 76.4% 79.7%
CP16 - % of Children on CPR with a completed CP plan 91.0% 89.0% 99.0% 99.0% 95.0% 100 %
CP43 - No of Child Protection Repeat Registrations - 18 months 0 0 0.0% 0.0%   0
CJ63 - % CPO cases seen without delay - 5 days 84.8% 95.6% 95.3% 85.3% 59.5%  80.0%
A&B - % of Adult Protection referrals completed within 5 days 45.8 % 39.50% 32.9% 20.0% 80.0%
A&B - % of Adult Protection referrals that lead to AP Investigation 12.5% 39.5% 11.0% 5.0% 10.0%
A&B - % of complaints [Stage 2] responded within timescale 25.0% 56.5% 73.0% 50.0% 20.0%
Outcome 8 - Health and social care workers are supported 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-10 - % of staff who say they would recommend their workplace as a good
place to work   71.0%  71.0% 70.0% 70.0% 70.0%  67.0%
SW only - HSCP Attendance 5.20  5.23 4.86 5.9 4.83 3.78 Days
Outcome 9 - Resources are used effectively in the provision of health and
social care services 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-15 - Proportion of last 6 months of life spent at home or in a community
setting  90.0%  91.0%   92.9% 91.3% 91.3% 90.1%
NI-18 - % of adults with intensive needs receiving care at home    67.0%  68.0% 72.3% 71.9% 71.9% 64.9%
NI-20 - % of health & care resource spend on hospital stays where patient
admitted in an emergency   22.0%  22.0% 19.2% 22.5% 22.5% 24.2%
*MSG 4.1 - Number of DD bed days occupied - A&B  9,530 8,237 5,338 7,006 11,083 8,604
Page 192

Page 193

41
Appendix 2 HWBOI’s/ Benchmarking 
(Note comments in relation to PHS advice on National Indicators unavailable until Jun 2023) 
Indicator Title Argyll & Bute HSCP A HSCP B HSCP C HSCP D HSCP E HSCP F HSCP G Scotland
NI - 1 Percentage of adults able to look after their health very well or
quite well 90.8% 92.4% 92.6% 92.4% 92.1% 92.7% 93.4% 91.7% 90.9%
NI - 2 Percentage of adults supported at home who agreed that they
are supported to live as independently as possible 75.0% 72.6% 72.1% 86.5% 73.4% 79.3% 73.1% 72.5% 78.8%
NI - 3 Percentage of adults supported at home who agreed that they
had a say in how their help, care, or support was provided 66.9% 76.8% 60.6% 72.1% 70.5% 70.2% 63.4% 64.3% 70.6%
NI - 4 Percentage of adults supported at home who agreed that their
health and social care services seemed to be well co-ordinated 66.0% 78.5% 54.1% 71.9% 64.5% 62.2% 59.3% 61.7% 66.4%
NI - 5 Total % of adults receiving any care or support who rated it as
excellent or good 68.6% 79.5% 70.3% 83.0% 78.6% 68.1% 73.9% 67.8% 75.3%
NI - 6 Percentage of people with positive experience of the care
provided by their GP practice 77.6% 69.8% 64.8% 77.2% 62.0% 60.0% 65.9% 67.3% 66.5%
NI - 7
Percentage of adults supported at home who agree that their
services and support had an impact on improving or maintaining
their quality of life
76.7% 81.7% 63.1% 84.3% 80.6% 73.3% 70.5% 79.2% 78.1%
NI - 8 Total combined % carers who feel supported to continue in their
caring role 38.0% 29.5% 30.8% 28.7% 27.4% 31.6% 29.4% 25.6% 29.7%
NI - 9 Percentage of adults supported at home who agreed they felt
safe 76.4% 84.9% 69.5% 86.0% 78.8% 72.1% 77.3% 75.3% 79.7%
NI - 11 Premature mortality rate per 100,000 persons 386 419 375 407 407 401 348 408 465
NI - 12 Emergency admission rate (per 100,000 population) 11,960 10,460 10,789 9,997 11,861 9,381 10,577 12,564 11,636
NI - 13 Emergency bed day rate (per 100,000 population) 104,253 92,375 112,745 106,529 105,914 83,298 121,675 95,726 109,429
NI - 14 Readmission to hospital within 28 days (per 1,000 population) 91 114 110 113 111 87 102 138 110
NI - 15 Proportion of last 6 months of life spent at home or in a
community setting 91.3% 92.5% 87.5% 91.5% 88.5% 92.3% 88.2% 90.1% 90.1%
NI - 16 Falls rate per 1,000 population aged 65+ 27.8 24.2 23.7 14.5 26.5 19.0 18.9 23.1 23.0
NI - 17 Proportion of care services graded 'good' (4) or better in Care
Inspectorate inspections 80.0% 75.7% 77.1% 80.3% 78.0% 80.0% 77.9% 87.0% 75.8%
NI - 18 Percentage of adults with intensive care needs receiving care at
home 71.9% 60.8% 63.4% 56.6% 63.8% 64.5% 57.5% 71.2% 64.9%
NI - 19 Number of days people spend in hospital when they are ready to
be discharged (per 1,000 population) 584 226 159 1,051 520 776 1,009 761 761
NI - 20 Percentage of health and care resource spent on hospital stays
where the patient was admitted in an emergency 22.5% 23.2% 23.0% 23.1% 23.3% 21.3% 20.4% 23.2% 24.2%
Core Suite of National Integration Indicators for Annual Performance Report
Page 193

Page 194

42 
Appendix 3 Winter & Systems Pressures Performance 
Page 194

Page 195

ARGYLL AND BUTE COUNCIL  MID ARGYLL, KINTYRE AND THE      
ISLANDS AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
7 JUNE 2023 
TARBERT AND LOCHGILPHEAD REGENERATION FUND – PROJECTS UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides an update on the 6 projects which Mid Argyll, Kintyre and
the Islands Area Committee agreed on 6 September 2017 focusing on those
projects which have not previously been reported to committee as complete.  
1.2 The Ardrishaig North Public Realm project completed on schedule and details of
the works are shown in Appendices 1 and 2. The works included changes to
the south car park as a result of recommendations of the pre-construction road
safety audit. Following concerns raised, a post-completion road safety audit is to
be undertaken. 
1.3 The only outstanding project is the Gleaner phase 2 site in Ardrishaig.
Discussions are ongoing in relation to this site. 
RECOMMENDATIONS 
Members of the Mid Argyll, Kintyre and the Islands Area Committee are asked to: 
1. Note the progress made with the projects as detailed within the report 
Page 195 Agenda Item 15

Page 196

ARGYLL AND BUTE COUNCIL  MID ARGYLL, KINTYRE AND THE      
ISLANDS AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
7 JUNE 2023 
TARBERT AND LOCHGILPHEAD REGENERATION FUND – PROJECTS UPDATE 
2.0 INTRODUCTION 
2.1 This report provides an update on the 6 projects which Mid Argyll, Kintyre and
the Islands Area Committee agreed on 6 September 2017 (ratified by Policy and
Resources Committee) should form the Tarbert and Lochgilphead Regeneration
Fund and proceed to full business case. The projects include:  
Project
Ref.
Project  Status
T02 Barmore Road (A83)/Garvel Road junction
improvement
Complete
T11 Tarbert Harbour facilities Complete
LA10 Lochgilphead Front Green Complete
LA11 Argyll Street Complete
LA13 Ardrishaig North Public Realm Improvements Complete
LA17  Gleaner Oil Site  Phase 1
complete, phase 2
ongoing 
The report below provides an update on the recently completed and remaining
ongoing projects. 
3.0 RECOMMENDATIONS 
3.1 Members of the Mid Argyll, Kintyre and the Islands Area Committee are asked to: 
1. Note the progress made with the projects as detailed within the report. 
4.0 DETAIL 
Ardrishaig North Public Realm (LA13) 
4.1 As advised in our previous report, works were commenced by P1 Solutions Ltd
on 29 August 2022 and they were certified as completed on 24 April 2023. The
works completed are shown on the drawing at Appendix 1 and include:
Page 196

Page 197

 A new lochside viewing area with additional seating and art work;
 Alterations to the north car park including an expansion of disabled parking;
 New artwork on the canal embankment;
 Reconfiguring of the memorial garden to include new seating areas, picnic
benches and a path;
 Improved accessibility for the Argyll Sea Kayak Trail making it easier for
kayakers to go between Loch Fyne and the Crinan Canal; 
A series of before and after photos are included at Appendix 2. 
4.2 The works included changes to the circulation of the south car park, this was
recommended during the pre-construction road safety audit to ensure that, when
in use the relocated bus layby didn’t obscure visibility to the north. Following
concerns raised since works have been completed a post-construction road
safety audit has now been instructed. 
Ardrishaig Gleaner Site (LA17) 
4.3 This project is being delivered by Scottish Canals with a grant being provided
through the Tarbert and Lochgilphead Regeneration Fund. Phase 1 of the
Gleaner Site, the Egg Shed, was completed in 2019. 
4.4 Discussions are ongoing between the Head of Development and Economic
Growth, senior members of Scottish Canals and a private investor as to a potential
development in relation to Phase 2 of the site. It is anticipated that further clarity
on whether this proposal is progressing will be known over the summer/autumn
time. 
5.0 CONCLUSION 
5.1 With the exception of the grant for the phase 2 of the Gleaner site all projects
shortlisted for funding through the Tarbert and Lochgilphead Regeneration Fund,
including all projects to be delivered by the Council, have been successfully
completed. We are in the process of finalising costs for the completed projects
and following this expect to be able to report upon the financial aspects of the
project as well as the outputs delivered. Should any underspend remain once the
agreed six projects have been completed this will be reported to Committee so
that arrangements can be agreed as to how this should be allocated. 
6.0 IMPLICATIONS 
6.1 Policy 
The projects will support the overarching objective and long term
outcomes of the Council’s Corporate Plan, Argyll and Bute Outcome
Improvement Plan, the Local Development Plan, the Economic Strategy.
It will deliver the Tarbert and Lochgilphead Regeneration Fund. 
6.2 Financial 
Page 197

Page 198

A total of £3 million is allocated through the Tarbert and Lochgilphead
Regeneration Fund, external funding has also been secured.
Expenditure at April 2023 is £3,131,461.27. 
6.3  Legal 
Working with procurement colleagues in regard to management of
contracts and tendering process. Leases, licences and memorandums of
understanding with third party progressed by the legal team where
necessary. 
6.4  HR 
Support required from colleagues across the Council particularly Roads
and Infrastructure Services who are the asset owners for the Lochgilphead
Front Green and Ardrishaig North. 
6.5  Fairer Scotland Duty: 
6.5.1 Equalities - protected characteristics   
Equalities and Socio Economic Impact Assessments have been carried
out. 
6.5.2 Socio-economic Duty  
See above 
6.5.3 Islands 
No impacts anticipated. 
6.6. Climate Change 
Construction works undertaken as a result of the Tarbert Lochgilphead
Regeneration Fund will result in carbon emissions although it is
anticipated that these will be restricted to the construction period. Works
at Lochgilphead Front Green raise the ground level of part of the green
and may offer a form of climate change adaptation. 
6.7 Risk  
As projects are completed the number of risks is reducing however for the
remaining ongoing project these include those associated with external
funding, public perception, etc. Project Risk Registers have been
maintained. 
6.8  Customer Service   
None at this time 
Kirsty Flanagan – Executive Director with responsibility for Development and  
Economic Growth 
Policy lead – Robin Currie 
Page 198

Page 199

29 May 2023 
Appendix 1 – Ardrishaig North Public Realm Landscape Plan
Appendix 2 – Ardrishaig North Public Realm Photographs 
For further information contact: 
Anna Watkiss, Senior Development Officer, Development and Economic Growth, Tel.
01546 604344 
Page 199

Page 200

Appendix 1 – Ardrishaig North Public Realm Landscape Plan   
Page 200

Page 201

APPENDIX 2 – Ardrishaig North Public Realm Photographs 
Before After      
Page 201

Page 202

Before After      
Page 202

Page 203

Before After   
Page 203

Page 204

This page is intentionally left blank

Page 205

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
June 2023
June 2023 Islay High School
Report
Stephen Harrison
Head Teacher 
Annual Report  
June 2023 Tarbert Academy
Report
Neil McKnight
Head Teacher 
Annual Report  
June 2023 Campbeltown
Grammar School
Report
David Mitchell
Acting Head Teacher
Annual Report  
June 2023 Lochgilphead
High School
Report
Jay Helbert
Head Teacher
Annual Report  
June 2023 Primary School
Report
Rosie MacKay & 2 Head Teachers Annual Report  
June 2023 Cemetery
Provision and
Maintenance
Jim Smith One off Report  
June 2023 Tarbert and
Lochgilphead
Regeneration
Fund
Audrey Martin
Development and Economic
Growth
Regular Updates  
June 2023 Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
June 2023 Quarterly
Performance
Scorecard FQ4
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
Page 205
Agenda Item
16

Page 206

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
22/23
June 2023 Alternative
reporting
solutions for
reporting on
performance
indicators
Stuart Green One-off  Going to
Business Days
instead of AC
June 2023 HSCP Bi-Annual
Update Report
Charlotte Craig/Fiona Davies
Argyll and Bute Health and Social
Care Partnership
Bi-Annual Report  
June 2023 Area Committee
Workplan
Shona Barton For updating  
June 2023 Supporting
Communities
Fund Applications 
David Hagerty/Kirsty McLuckie
Chief Executive
Annual Report  Usually goes
in March but
for 2023 only it
will not be
presented until
June round of
meetings.
September 2023
September
2023
Annual Recycling
Performance
Report
Jim Smith
Roads and Infrastructure Services
Annual Report  
September
2023
Quarterly
Performance
Scorecard FQ1
23/24
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
Page 206

Page 207

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
September
2023
Supporting
Communities
Fund – End of
Project
Monitoring 21/22
Rona Gold/Antonia Baird
Chief Executive
Regular Report  
September
2023
Skills
Development
Scotland
Susan Macrae, SDS Annual Report  
September
2023
Area Committee
Workplan
Shona Barton For updating  
December 2023
December
2023
Quarterly
Performance
Scorecard FQ2
21/22 
Performance
Report
Presentation
Jane Fowler/Sonya Thomas
Performance and Improvement 
Stuart Green
Quarterly Report  
December
2023
HSCP Bi-Annual
Update Report
Charlotte Craig/Fiona Davies
Argyll and Bute Health and Social
Care Partnership
Bi-Annual Report  
December
2023
ACHA Annual
Update
Chief Executive ACHA Annual Report  
December
2023
Charities and
Trust Funds
Shona Barton
Legal and Regulatory Support 
Annual Report  
Page 207

Page 208

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
December
2023
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
December
2023
Local Housing
Strategy Annual
Update
Douglas Whyte, Strategic Housing  Annual Report  
December
2023
CHARTS Update Seymour Adams
(seymour@chartsargyllandisles.org) 
One-off  
December
2023
Area Committee
Workplan
Shona Barton For updating  
March 2024
March 2024 Transport
Scotland Update
Neil MacFarlane
Transport Scotland 
Annual Report  
March 2024 Scottish Water
Update
Georgie Reid
Scottish Water 
Annual Report  
March 2024 Quarterly
Performance
Scorecard FQ3
23/24
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
March 2024  Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
March 2024 Strategic Housing
investment plan
(SHIP)
Douglas Whyte
Development and Economic
Growth
Annual Report  
March 2024 Area Committee Shona Barton For updating  
Page 208

Page 209

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
Workplan
Future Items 
Patient Transport
Policy
Health and Social Care
Partnership
One off Report  Update on new
policy following
completion of
review 
Flooding Issues
in MAKI
Roads and Infrastructure Services
Jim Smith 
Ongoing   
MAKI
Accessibility and
Footway Survey
TBC TBC  
June 2024 Islay High School
Report
Stephen Harrison
Head Teacher 
Annual Report  
June 2024 Tarbert Academy
Report
Neil McKnight
Head Teacher 
Annual Report  
June
2024
Campbeltown
Grammar School
Report
David Mitchell
Acting Head Teacher
Annual Report  
June 2024 Lochgilphead
High School
Report
Jay Helbert
Head Teacher
Annual Report  
September
2024
Primary School
Report
Rosie MacKay & 2 Head Teachers Annual Report   
Page 209

Page 210

This page is intentionally left blank

Page 211

ARGYLL AND BUTE COUNCIL  Mid Argyll, Kintyre and the Islands     
Area Committee
DEVELOPMENT AND INFRASTRUCTURE 7 June 2023 
WHITE HART HOTEL: DANGEROUS BUILDING 
1.0 EXECUTIVE SUMMARY   
1.1 Purpose: This report advises Members of actions taken by the Council’s Building
Standards in respect of the former White Hart Hotel, Main Street, Campbeltown. 
1.2 The building has been unoccupied for some years and has fallen into a state of
disrepair. Responding to complaints, urgent work was carried out by building
standards, using emergency powers under sections 29 and 30 of the Building
(Scotland) Act 2003, to remove imminent dangers to public safety. A Dangerous
Buildings Notice was been served on the property owner requiring them to
“commission a structural engineer to assess the current structural condition of the
White Hart Hotel and carry out the structural works as specified by the structural
engineer to ensure that no structural issues are evident on completion of the
required works.”   
1.3 Financial: all costs incurred by the Council in protecting public safety, including the
erection and hire of the heras fencing and pedestrian barriers, will be recovered from
the property owner. 
1.4 Recommendations 
Members are asked to note this report.   
Page 211 Agenda Item 17

Page 212

ARGYLL AND BUTE COUNCIL  Mid Argyll, Kintyre and Islay
Committee
DEVELOPMENT AND INFRASTRUCTURE  7 June 2023 
WHITE HART HOTEL: DANGEROUS BUILDING 
2.0 INTRODUCTION   
2.1   This report advises Members of actions taken by the Council’s Building Standards in
respect of the former White Hart Hotel, Main Street, Campbeltown. The building has
fallen into a state of disrepair and the owner advises that it is their intention to
completely renovate the hotel over the next three years.  Presently the condition of
the building is causing concern to neighbours and the wider community. 
2.2 Responding to complaints received week commencing 1st May 2023, urgent work
was carried out by building standards, using emergency powers under the Building
(Scotland) Act 2003, to remove imminent dangers to public safety.   
3.0 RECOMMENDATIONS 
3.1       Members are asked to note this report. 
4.0 DANGEROUS BUILDING 
4.1 The White Hart Hotel is located on Main Street, Campbeltown and has been closed
for some time. It is privately owned with the owner responsible for property
maintenance and the general conditions of the building has deteriorated since the
hotel closed. 
4.2 Following complaints received on 2 May 2023, an assessment by the Council’s
Building Standards Team identified that immediate repairs were required to board
up a window and remove some debris. This work was carried out using the
Council’s formal powers and contact was made with the owner requiring further
inspections and repairs as a priority. 
4.3 Given the deteriorating condition of the building and potential risk to public safety,
the decision was taken by the Council’s Building Standards Team on 3 May 2023,
using emergency powers under the Building (Scotland) Act 2023, to erect heras
fencing restricting access to the pavement areas around the building, pending
further discussions with the property owner. On the recommendations of the
Roads Service a pedestrian walkway was been created using additional road
barriers to protect the public from road vehicles.     
4.4 A further inspection on 5 May 2023 carried out with the owner, confirmed that the
mitigation measures were appropriate pending a structural engineers report. The
owner instructed a structural engineer to inspect the property and agreed to
undertake any recommendations following the outcome of that inspection. 
Page 212

Page 213

4.5 A Dangerous Buildings Notice was been served on the property owner requiring
them to “commission a structural engineer to assess the current structural
condition of the White Hart Hotel and carry out the structural works as specified
by the structural engineer to ensure that no structural issues are evident on
completion of the required works.” 
4.6 The structural engineer inspected the building on the 10 May 2023 and the report
was received by building standards on the 22 May 2023. The report recommends
some structural work and inspections by building standards on the 12 and 23 May
2023 noted that these structural works are well underway.    
5.0 FUTURE ACTIONS   
5.1 The Building (Scotland) Act 2003 provided powers to local authorities to deal with
buildings which are an imminent danger to public safety and to service a formal
Dangerous Building Notice on the owner(s) requiring immediate repairs or specific
actions. The Council can undertake these works in default of the Notice, and where
there is an immediate need to protect public safety, with all cost recovered from
the owner(s). These powers do not extend to general repairs, which are the
responsibility of the owner. 
5.2 Maintenance of the building is the responsibility of the owner and their intentions
with the building are yet unknown. Building Standards can only deal with issues
where there is an imminent risk to public safety. 
5.3 Building Standards will continue to monitor the situation to ensure that the
Dangerous Buildings Notice is fully complied with; to liaise with the owner, and
determine the adequacy of the current measures in protecting public safety in
regards to the structural engineers report. 
5.4 Building Standards will continue to update local elected members on the situation
of any developments 
6.0 CONCLUSIONS   
6.1 The actions taken by Building Standards protected public safety and were undertaken
very quickly and effectively. There are ongoing discussions with the property owner
and the situation is being monitored. The structural engineers report is currently being
actioned by the owner who has given a commitment to carry out all urgent works to
comply with the formal Dangerous Buildings Notice. The heras fencing and
pedestrian protective barriers will only be removed once all safety measures specified
in the structural engineering report have been undertaken and completed. 
Page 213

Page 214

7.0 IMPLICATIONS   
7.1 Policy Consistent with Council priorities 
7.2 Financial Any costs incurred by the Council in responding to this dangerous
building will be recovered from the owner. 
7.3 Legal Effective use of powers under the Building (Scotland) Act 2003 
7.4 HR None. 
7.5 Fairer Scotland 
7.5.1 Equalities There are no equality or sustainability issues associated with the plan 
7.5.2 Socio-
economic 
7.5.3 Islands There are no island implications. 
7.6 Climate
Change
There are no climate change implications. 
7.7 Risk Public safety risks have been minimised thorough the actions by
Building Standards
Risk that Council may require to undertake works in default, if the owner
fails to meet their commitment to carry out any specified urgent works. 
7.8 Customer 
Service
No significant issues. 
Executive Director with responsibility for Regulatory Services: Kirsty Flanagan 
Policy Lead for Planning and Regulatory Services: Councillor Kieron Green 
For further information contact:  Alan Morrison, Regulatory Services and Building Standards
Manager, email alan.morrison@argyll-bute.gov.uk. 
Appendix I: Photograph of the White Hart Hotel, Campbeltown 
Page 214