Democracy Spraffa

HSCP Annual Performance Report 2022-2023

Argyll and Bute Council · 7 June 2023
Back to Mid Argyll, Kintyre & the Islands Area Committee — 7 June 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
Year One Progress Report

Page 2

2
Contents
Foreword ........................................................................ 4
Introduction .................................................................... 5
Key Achievements ........................................................... 6
Children’s Services ............................................................................................................. 6
Child Poverty ......................................................................................................................... 6
Child Protection .................................................................................................................... 7
Violence Against Women and Girls ............................................................................... 8
Adult Protection ................................................................................................................... 9
Community Justice ........................................................................................................... 10
Public Health ....................................................................................................................... 11
Right Care Right Time ..................................................................................................... 12
Adult Care –Older Adults/Adults and Hospitals ..................................................... 13
Learning Disabilities ......................................................................................................... 14
Mental Health ...................................................................................................................... 15
Primary Care ....................................................................................................................... 16
Dentistry ............................................................................................................................... 17
Alcohol and Drug Partnership (ADP) .......................................................................... 18
Allied Health Professionals (AHP) ................................................................................ 22
Carers .................................................................................................................................... 22
Prevention Programme ................................................................................................... 23
Digital Health and Care Strategy ................................................................................ 23
Coporate Services ............................................................................................................. 24
Technology Enabled Care (TEC) .................................................................................. 24
Performance Management and Governance ........................ 26
Introduction ......................................................................................................................... 26
Integrated Performance Management Framework (IPMF) ................................ 26
Key Performance Overview ........................................................................................... 27
Benchmarking ..................................................................................................................... 27
Waiting Times & Long Waits ......................................................................................... 27
Homecare ............................................................................................................................. 28
Residential Care ................................................................................................................. 29
Delayed Discharge ............................................................................................................ 29
Adult Support & Protection ............................................................................................ 30
Resilience in Care at Home (Unmet Need).............................................................. 30

Page 3

3
Children & Families ........................................................................................................... 31
Community Health ............................................................................................................ 32
Adult Care ............................................................................................................................ 32
Technology Enabled Care & Falls ................................................................................ 33
Child & Adolescent Mental Health & Psychological Therapies .......................... 34
Winter & Systems Pressures ......................................................................................... 34
Financial Performance and Best Value ............................... 35
Financial Performance ..................................................................................................... 35
Financial Performance 2022-23 ................................................................................... 35
Financial Outlook, Risks and Plans for the Future ................................................ 35
Best Value ............................................................................................................................ 36
Appendices ................................................................... 39
Appendix 1 IJB Scorecard ................................................................................................... 39
Appendix 2 HWBOI’s/ Benchmarking .............................................................................. 41

Page 4

4 
Foreword 
Argyll and Bute Health and Social Care Partnership has experienced another difficult year as
we try to recover from the obvious challenges of the past few years.
This year the HSCP continued to struggle with workforce sustainability, reduced capacity in
the community and backlogs in our waiting times to name just a few.
Despite this, the HSCP continues to be ambitious for our communities and this report
highlights the positive outcomes the integration of health and social care services can have
on individuals, families and the wider community along with the input of those with lived
experiences of our services.
Our Staff, Partners, Carers and Volunteers continue to demonstrate the upmost dedication,
hard work, resilience and commitment to our services. We continue to be thankful and
grateful for everyone’s efforts in these difficult times. 
Sarah Compton-Bishop                                                           Fiona Davies      
Chair of Argyll & Bute                                                Chief Officer of Argyll & Bute 
Integration Joint Board                                                                HSCP

Page 5

5
Introduction 
Welcome to Argyll and Bute’s Annual Performance report for the year 2021 as required by
Public Bodies (Joint Working) (Scotland) Act of 2014.
This document sets out how the Health and Social Care Partnership (HSCP) has performed
and builds on the information published within previous reports and to provide progress on
how we have improved and adapted, reshaping services which are fit for the future.
The HSCP is a complex organisation bringing together a range of partners, services and
substantial financial resources. The partnership is responsible for meeting local and national
objectives and it is therefore important that we publically report on how we are performing
against the agreed outcomes that we aspire to.
The Annual Performance report provides an opportunity to reflect on the past year. A year
that was extremely challenging yet we were still able to celebrate achievements.
I thank all colleagues and partners for their ongoing efforts to deliver our vision and
essential health and social care services for local people and those most in need, and hope
we can all share in the successes of delivering longer, healthier and independent lives.

Page 6

6
Key Achievements 
Priorities Year 1  Progress
Continue to deliver on the Children and Young
Peoples Service Plan (CYPSP). 
The Children and Young Peoples Service Plan work
continues, the new Plan for 2023 – 26 is currently being
progressed.
Continue to deliver on the Corporate Parenting
Plan.
On track and progress monitored by Corporate Parenting
Board and reported to Strategic Group.
Continue to monitor and evaluate progress in all
our service plans. 
Progress is monitored and evaluated annually, updated are
reported and send to Scottish Government.
Develop transformation aspirations for the Service.  Work is progressing to ensure more young people are
involved in the CYPSP.
Develop programme of change in relation to the
Children’s Promise Change programme. 
The Promise is an ambitious 10 yr national
transformational change programme for Scotland’s Care
system. Local actions embedded in Corporate Parenting
Plan and CYPSP. 
Continue to engage with Children and staff on
transformation agenda. 
We have established 7 locality care experienced
participation forums which meet regularly. 
Work is progressing to ensure more young people are
involved in the CYPSP.
Evaluate the outcomes of the 2018-2021 Argyll and
Bute Equally Safe Implementation Plan. 
A meeting took place to discuss this but it was decided to
delay update in order to align the plan with the Community
Justice Plan.  Update will take place in 2023.
Continue to act as a conduit for information and
resources on Equally Safe / Train/ National
initiatives for managers and staff.
This has been taking place and will continue to do so.
Develop project plan for Transforming Responses to
Violence against Women and Girls Project.  
Plan was developed and will be updated in 2023. 
Priorities Year 1  Progress
Child Poverty Action Group to continue to meet and
develop actions to tackle the three drivers of child
poverty.
Child Poverty Action Group has continued to meet and
monitor and tackle the three drivers of poverty.
Look at impacts of Covid-19 and EU exit; consider
what actions are required by the Child Poverty
Action Group and its members to address these.
This has been done and necessary measures taken by our
members; for example extending the Flexible Food Fund
and ensuring best coverage by advice services.
Produce a formal communications and engagement
plan.
A Communications and Engagement Group has been
formed and there is a draft communications and      
Children’s Services 
Child Poverty

Page 7

7 
engagement plan that is being worked on.
Begin to deliver Money Counts training to staff in
Argyll and Bute. 
This has taken place and is ongoing.  There was also the
delivery of a wide range of other training events for staff
designed to improve awareness and service delivery.
Review the Child Poverty Action Plan and assess
progress on key areas of work.
The plan was reviewed and published in 2022.  Reporting
duties were met and the report outlined key areas of
work. 
Begin to develop a Data Base to improve
monitoring and focus of resources locally. 
Data has been collated for the plan and other purposes. 
A new data collection and analysis system “Power BI” is
now being developed and will greatly improve our ability
to recognise areas of local need. 
Priorities Year 1  Progress
All new Child Protection Committee (CPC) members
will receive a CPC induction pack and will meet with
Lead Officer to discuss the role of the CP and
expectations of CPC members. All CPC members will
attend CPC development sessions to contribute to
the role and function of the CPC. Members will be
required to demonstrate through the delivery of the
CPC improvement plan that information is being
disseminated within their organisation and that
actions attributed to their organisation are
progressed and reported to CPC.
Induction pack complete.  All new members have met
with Lead Officer.  This is ongoing as and when new
members attend.
We have recorded via minutes when information has to
be disseminated within organisations and what action
has been taken.
Produce and implement a biennial Strategic
improvement plan which will be monitored by the
Performance, Quality and Assurance (PQA) using a
RAG system. Red actions will be reviewed by PQA
and reported to CPC.
Plan in place and being monitored. Some slippage due
to post Covid challenges and staffing challenges.  CPC
does not currently have a lead officer so plan needs to
be reviewed to ensure on track for rest of 2023.
Multi agency training will be delivered using a tiered
approach to learning which will include: General
contact workforce, Specific contact workforce and
Specialist contact workforce. 
Training has been delivered via online following Covid
challenges.  Some face to face key training delivered. 
Training has had to be halted as CPC does not have a
training officer – awaiting advert and appointment. 
Online training can be accessed across partner agencies. 
This will require to be addressed as soon as the training
officer is in post.
Develop and implement training framework which
supports practitioner knowledge and confidence in
working with Child Sexual Abuse which includes Child
Sexual Exploitation and child trafficking.
This work had to be cancelled last year due to
competing practice demands.  Will be picked up when
the new Lead Officer comes in to post.
Domestic Abuse Guidance and Flowchart
implementation to be evaluated and regular audits of
referrals to be carried out.
Domestic Abuse guidance has been implemented
however no auditing working has taken place.  This
should be a priority during 2023.
Improved interface between children & adult
services particularly where parental mental health
substance misuse and domestic abuse are present.
One meeting has taken place, but still significant work to
align Children and Families and adult processes
Joint session between Adult Protection Committee and
Child Protection planned for May 2023.        
Child Protection

Page 8

8 
Advocacy services will engage with children on the
Child Protection register to understand their
experience and to provide the CPC with
recommendations as to how things can be improved. 
CPC receives bi-annual reports from the advocacy
worker.  The reports provide evidence of face to face
engagement with children and seek the views and
comments by children and families.  CPC find these
reports very informative re needs of children on the
Child Protection register. 
Priorities Year 1  Progress
Establish a Project Board to oversee the delivery
of the Transforming Responses to Violence Against
Women and Girls Project.
A board has been established although there have been
difficulties in arranging some meetings.
Use the Domestic Abuse-Informed Practice and
Systems: Self-Assessment Tool to establish a
baseline for services prior to training and service
change measures.
The tool was used and the survey stage undertaken; it
has not yet been possible to complete the process with
the board.
Establish working groups to facilitate training and
other aspects of the transformation project.  
Working Groups have delivered on the necessary areas of
training and on the research elements of the plan.  This
will continue in 2023.
Research to assess the impact of the Transforming
Responses to Violence Against Women and Girls
Project, to begin.
The first phase of research has taken place, looking at
lived experience and staff views of services.  A second
phase looking at the views of perpetrators will take place
in 2023.
Roll out of the Safe and Together Model to
commence. 
This has begun and a large number of staff and some
managers are currently undertaking training.  There has
been some delay due to operational reasons.  Roll out will
continue through 2023 – 2024.
Roll out of other training to commence including;
Awareness Raising; Routine Enquiry; Zero
Tolerance and Commercial Sexual Exploitation. 
Seven events were successfully delivered and this will
continue in 2023-2024.  It was not possible to delivery
Zero Tolerance as the organisation no longer offers
specific training to organisations.  
Roll out of DASH training to relevant workers.  This has been taking place and will continue in 2023.
Review the Argyll and Bute Equally Safe Plan.  This was delayed due to the need to align with
Community Justice Plans.  Will take place in 2023.
Development of Data Base that will assist us to
monitor trends in Domestic Violence and other
gendered violence.
Whilst some data was collected development of a data
base still requires to be done in 2023.
Deliver Annual Return from Argyll and Bute to the
Improvement Service / National Violence Against
Women Forum.
This did take place and will be updated in 2023.        
Violence Against Women and Girls

Page 9

9 
Priorities Year 1  Progress
Meet the Improvement Plan targets arising from
Inspection. 
Progress made:-
 We have introduced a trial of a new Chronology
format to ensure standardisation and improve quality
of chronologies.
 We have encouraged in person participation in Adult
Support and Protection (ASP) case conferences where
appropriate and safe to do so.
 Training has been developed to ensure appropriate
use of trained second workers from Health and other
disciplines.
 Through the Council Officer Forum and ASP training
we have ensured regular use of case studies and
Significant Case Review (SCR) Findings.
 Staff support is provided by development of Council
Officer, Multi-Agency Forums and ASP training. 
Emphasis is placed on Trauma Informed Practice via
revised Codes of Practice dissemination.
 Further development of Awareness ASP training
achieved and targeted at specific groups, to improve
knowledge and understanding of ASP process, across
the Partnership, and raise awareness within the
Community.
Implement Code of Practice changes.  We have continued to implement Code of Practice
revision sharing briefings on changes across the
Partnership,  including:- 
 Further detail on the 3 point criteria.
 Clarification on capacity and consent.
 Emphasis on duty to refer and co-operate in Inquiries.
 Clarification regarding sharing expectations and the
new section on chronologies.
 Clarification of relationship between inquiries and
investigations.
 Further detail and clarification on visits and
interviews.
Implement guidance for Primary Care and GP’s.  New guidance introduced July 2022, promoted through
Adult Protection Committee and Authority wide ASP
Action Team. Material passed to NHS colleagues for their
attention.
Progress audit activity, case files. Investigation undertaken to determine most appropriate
platform in order to streamline process. Short life
working group to be established to plan audit proposed
for May/June 2023.        
Adult Protection

Page 10

10 
Develop issues arising from Initial Case Reviews,
Large Scale Investigation findings. 
Several overarching Adult Protection and Adults with
Incapacity themes have been scrutinised and practice
improvements made with regard to the findings of an
Initial case review.  Specifically process around
Guardianship/Adults with Incapacity/Mental Health
Officer roles, and reviews, Care at Home – Social Work
support, financial management where an individual is
considered an Adult with Incapacity and there is a
requirement for clear lawful authority.
Major review of care at home services and financial
controls introduced following an Initial Case Review.
Develop ‘escalation’ policy.  Recognising that ASP case escalation forms part of a
wider multi-agency escalation policy the service has
contributed to the development of the Partnership’s
Complex Case Escalation Protocol.
Support staff and communities as
recovery from Covid regulation
emerges. 
Emphasis within staff and community awareness training
has been placed on neglect and self-neglect (particularly
identifying signs and symptoms) increasingly evident in
larger numbers since Covid.  Staff have been supported
to consider best practice in ensuring the Adult remains at
the centre of all ASP activity as work practice changes -
working from home, online case conferences. 
Priorities Year 1  Progress
Develop a local Community Justice Outcome
Improvement Plan, in line with the priorities of
the Scottish Government national Justice and
Community Justice Strategies. 
Refreshed National Strategy for Community Justice
published June 2022.  Associated Outcomes, Performance
and Improvement Framework delayed publication date
now 01/04/2023.  Local plan development progressing
well, draft key actions agreed by Community Justice
Partnership, statutory consultation process underway. 
Expected publication date June 2023.  
Develop strategic and operational links with Third
Sector and Children’s Services (Youth Justice) and
other key local partnerships. 
Community Justice Partnership agreed a Youth Justice
work stream, in the process of establishing a multi-agency
sub group. 
Third Sector statutory consultation underway in relation
to development of the local Community Justice Outcome
Improvement Plan.
Support and monitor the implementation of the
Justice Social Work (Community Justice)
Improvement Plan. 
Justice Social Work Service Plan is complete, Community
Justice Partnership scrutiny process in final stages of
completion, reliant on the publication of the Scottish
Government Outcomes and Performance Improvement
Framework due 1 April 2023.
Review the learning from the first phase jointly
commissioned research report for Violence
Against Women & Girls and implement key
recommendations.
Final report due March 2023.  Draft report (excluding
analysis and key findings from consultation) received and
presented to Community Justice Partnership. 
Community Justice

Page 11

11 
Implement the prison Custody to Community
pathway, including performance reporting and
monitoring. 
Proposals for model of delivery agreed by Community
Justice Partnership, consultation with wider third sector
partners underway.  Commissioning additional third
sector support in relation to independent advocacy
underway.  Publication of the Scottish Government
Community Justice Outcomes and Performance
Improvement Framework delayed until 1st April 2023.
Finalise the review of our local Community Justice
Partnership. 
Significant progress has been made in prioritising and
streamlining the Partnership.  Due to the delay in
publication of the national Outcomes, Performance and
Improvement Framework, we will finalise during
2023/2024. 
Priorities Year 1  Progress
Develop joint Health Improvement plan between
Argyll and Bute and North Highland. 
A joint two-year Health Improvement plan has been
developed between Argyll and Bute and Highland, with a
view to delivering some pieces of work NHS Highland-
wide where appropriate.  The joint workplan was
developed using team workshops to identify priorities
and then small working groups to refine each topic.  As
this is a new joint development, it will be monitored for
effectiveness.  The aim is to improve collaboration and
working relationships, share learning and streamline
pieces of work where relevant. Local context will always
be considered within each workstream.
Pandemic recovery - Social Mitigation Strategy:
child poverty; financial inclusion; children’s rights;
equalities; mental health improvement and
support. 
The public health team contribute to the Child Poverty
agenda through the Argyll and Bute Child Poverty Action
Group and the Argyll and Bute Financial Inclusion and
Advice Group.  We have delivered Money Counts training
to a range of health, social care, and 3rd sector staff. 
Deliver on the 5-year implementation plan for
Living Well strategy: workforce development; self-
management; community link working; physical
activity; mental wellbeing; suicide prevention;
smoking cessation. 
Public Health and partners (including Argyll and Bute
HSCP, Argyll and Bute Council and 3rd sector) continue to
deliver on the 5-year Living Well strategy implementation
plan.  A mid-strategy report was published and
disseminated.  This report celebrates the wealth of work
undertaken by Living Well partners, the Living Well
Networks and via the Living Well capacity building fund
over the first 2.5 years of the strategy. It also allows us to
reflect on the challenges of the COVID-19 pandemic and
how this impacted on self-management and our
communities. Finally, this report looks ahead to the
future of Living Well and the importance of its links to the
Argyll and Bute Health and Social Care Partnership (HSCP)
Joint Strategic Commissioning Strategy (JSCS) and Joint
Strategic Plan (JSP). 
Public Health

Page 12

12 
The 5-year implementation plan has been reviewed and
focused steering group meetings have been agreed to
progress any outstanding pieces of work.  The Living Well
steering group continue to meet bi-monthly.
Building capacity for health improvement:
education; Living Well Networks; community
planning; locality planning groups; engagement;
place-based work. 
The Public Health team continue to build capacity for
health improvement in partners and our communities. 
Our Living Well networks hold quarterly meetings within
their local areas which are well attended by members of
the community, Third Sector and Statutory sector. In
addition, communications, surveys, consultations etc
from various sources (e.g. Public Health team, Locality
Planning Groups, Third Sector) are sent out by email and
social media via the Networks. 
The Public Health team regularly attend Area Community
Planning Groups, relevant thematic Community Planning
groups and Locality Planning groups to build capacity for
health improvement and coproduction. 
The Public Health team host bimonthly education
sessions open to HSCP staff and Third Sector. Recent
sessions included survey design, Versus Arthritis,
gambling harm and the Shaping Places for Wellbeing
programme.
Respond and deliver national strategy and targets
– suicide prevention; smoking cessation; Fairer
Scotland. 
The Smoking Cessation team within Public Health
continue to deliver a service across A&B that targets the
40% most deprived communities but is available to all
residents. The targets set by Scottish Government for
NHSH are reviewed regularly to ensure the optimum
progress is made towards achieving these. The team are
also employing their expertise in working with clients on a
1-1 basis to raise awareness of screening opportunities in
line with strategy from the Scottish Government. 
The Public Health team supports the delivery of the local
suicide prevention action plan working with the suicide
prevention group.
Alcohol and Drug Strategy actions – reduce drug
deaths; recovery orientated support.
Alcohol and Drug strategy actions are reported under the
Alcohol and Drug specific priorities. 
Priorities Year 1  Progress
Unscheduled Care (USC) leadership post in place.  Recruitment of Programme Manager start date April 2023.
Localities will have agreed actions plans to
support the two key areas of improvement.
No we re-focused this as an area wide plan rather than on
localities.
Plan and progress spend on the recurring A sub group has been established to oversee spend in     
Right Care Right Time

Page 13

13 
funding from Scottish Government.  relation to Key Performance Indicators, this reports to USC
Steering Group.
Established working groups with capacity to
progress change and support localities. 
Three sub groups established: Enablers, Community Teams
and Discharge without Delay. Focusing on key priorities.
Programme Manager will support.
Enhancing multi-disciplinary community teams
to be responsive, flexible, highly skilled,
continually assessing with a re-abling and
rehabilitation ethos and high quality end of life
care with the skills to provide simple care that
currently involves a hospital admission.
This will relate to the work of the Community Teams and
the care at home strategy group. There is also overlap with
the development of the palliative care section of the older
adult strategy.
Enhance clinical education for all staff develop
skill mix, apprenticeships and health care
support worker skilled roles. 
The updated action plan developed by the Community
Teams from the Community Standards will be supported in
implementation through the Enablers sub group. This
forms part of the Enablers sub group.
Provide enabling care at home that is effectively
commissioned and planned for those who need
it, with enough capacity to be provided following
assessment at home and at the point of need. 
A Smarter Commissioning Process has been developed.
Assessment of unmet need is ongoing there is a clear
process of reviewing unmet need. Longer term focus on re-
ablement and care at home modelling is required and
being considered through the Care at Home Strategy
development.
Performance metrics regular reported on. Key Performance Indicators have been developed and will
link with the Integrated Performance Framework.
Evaluate spend on community teams, unpaid
carer services & short breaks, response services,
care at home, community palliative care and
NHS GG&C delayed discharge.
For year 2
Consider models for community services with
the aim of minimising different services/staff
visiting people in community and improving flow
through hospital.
As above- linked to Community Teams and Social Work
Action plan through the review of Community Standards. 
What do our communities want to increase
support unpaid carers? 
Engagement on short breaks-looking for short break
support at home.
What do communities want from HSCP
community teams?
Limited engagement so far. 
Agree model that assist us to move towards a
National Care Service.
Partly related to Getting It Right For Everyone. 
Priorities Year 1  Progress
Support care at home through a challenging
winter, linking unscheduled care elements to
limit duplication and make best use of the total
resource available. 
Extensive efforts have gone into both reporting and
assuring on care at home services including the
development of mobile teams to meet unmet need.
Smarter Commissioning is being rolled out with providers.
A review of this process will provide information required
on resource availability and whether this way of working is
beneficial to service users and staff. It will also ensure that       
Adult Care –Older Adults/Adults and Hospitals

Page 14

14 
all providers are working collaboratively to deliver the most
effective and efficient service possible and will feed into
the tender process due next year.  A redesign of care at
home with relevant support from other disciplines is
required.
Develop a care at home strategy to agree and
monitor key developments to build a flexible and
sustainable service. 
Work has been undertaken to scope the main elements of
the care at home strategy which needs to link with internal
redesign and timescales for developing the care at home
contract.
Develop an Older Adult Strategy.  We have worked on a number of areas of the strategy
focusing on:
 Care Homes and Housing
 Palliative and End of Life Care
 Care at Home
 Right Care, Right Time
 There have also been links to National areas of strategy
 Strategy needs completed and consulted on.
Develop a robust plan around winter planning,
mapping out all elements of service delivery,
what the pressures are and how they impact on
each other. 
We submitted a Winter Checklist to the Scottish
Government in November 2022 and a winter plan was
developed for Argyll and Bute. 
We reviewed our operational and governance structures
for winter planning and pressures and with refinement we
should retain this structure and process for 2023-2024.
Work in partnership with providers, supporting
elements such as recruitment, training to ensure
best use of resources. 
Additional human resource support has been identified to
link recruitment and retention processes with all care
providers – internally provided and externally
commissioned by the HSCP. These posts will also link to the
wider corporate regeneration agenda for Argyll and Bute.
Review the use of Extended Community Care
Teams (ECCT) and link them to other community
services.
A review was completed however its scope did not allow
for an examination of a changing role for ECCT. This needs
to link with redesign of care at home.
Complete a building appraisal for internal care
homes and develop an overarching care home
and housing strategy. This will include the
position of intermediate care within Argyll and
Bute.
The building appraisal has been completed for internal care
homes and a Short Life Working Group on repairs is looking
to prioritise repairs. Demand modelling was undertaken.
The strategy requires further work.
Complete a needs assessment and collaborative
health and social care plan for Coll, as a template
for island approaches.
This was completed by the Coll Collaborative Group. Key
learning needs to be rolled out to other island
communities. 
Priorities Year 1  Progress
Development of A&B specific Learning Disability
and Autism Strategies, in line with the A&B HSCP
Engagement Framework. 
Initial scoping work was undertaken, however this
required to be paused due to capacity issues. Temporary
post currently advertised to lead on the development and
implementation of Neurodevelopment Strategy with a
full lifespan approach.  
Review and redesign of Learning Disabilities Day Stage 1 of the Review and Redesign on Day Services now           
Learning Disabilities

Page 15

15 
Services across A&B, working in partnership with
H&SC staff, care providers, service users, carers
and wider communities to develop future models
of support. 
complete. Redesign of Staffing Structure for Internal
Registered Services completed in 2022, with remaining
vacant posts currently being recruited to. Stage 2 – the
development of services currently ongoing and will be
carried over to Year 2 and Year 3 as part of the 3 year
action plan for services.
Implementation of the actions set out in the
Learning/Intellectual Disability and autism –
Recovery and Transformation Plan.
This is no longer considered a specific priority for the
HSCP. Any outstanding actions will be considered as part
of the Neurodevelopmental Strategy.
Continue to utilise technology and telecare where
appropriate to increase independence, whilst
ensuring the safety and wellbeing of service
users. 
Ongoing – utilisation of technology and telecare where
appropriate has resulted in the removal of many
sleepover provision across A&B in order to increase
service user independence. 
Priorities Year 1  Progress
Progress planned developments associated with
Transforming Together agenda for mental health. 
Core and cluster has not progressed for mental health
services, this needs dedicated project support and
commissioning to progress.
Community Mental Health Services review and
outcomes. 
The 2018 review outcomes continue to progress such as
developing a Mental Health directorate, Consultant
sector/locality model, developing Primary care teams and
crisis interventions. This agenda was paused through
Covid and will be refreshed to ascertain the aspects and
recommendations remain outstanding.
Psychological Therapies (PT) – we are working
with the Scottish government to develop a
business case to enhance and develop our PT
services across A&B and to assist us to meet the
expectations and demand for services in a timely
and effective manner. The teams are now
realigning to make an A&B wide service under
one management structure to ensure better
oversight of waitlist and service delivery at tier 3
and 4.
We continue to work with the Scottish Government to
develop services and capacity planning to address waiting
times. In the past 2 years we have realigned Psychological
therapies for tier 3 and 4 to develop a team with
appropriate governance, oversight and ownership. We
recruited a Consultant Psychologist and strengthened the
relationship with the Director of Psychology in NHS
Highland. The business case was submitted and we
continue to apply developing capacity models and
standards currently under development.
The primary care mental health team have also
realigned to work across GP surgeries and to
support those presenting with mild and moderate
mental health concerns. This team have a
Multidisciplinary Team approach and have a
wellbeing nurse, Occupational Therapy (OT),
guided self-help worker and primary mental
health worker in each locality.
This is complete and the teams are embedded in each
locality. Helensburgh and Lochside are served via a
Service Level Agreement (SLA), additional resource was
provided to the SLA to secure an OT and wellbeing nurse
within their delivery model. The next stage will be
determined by the Mental Health and Wellbeing in
Primary Care agenda and directives awaited from the
Scottish Government.
Care Reviews.  The reviewing team were required to be redirected to
Adult support and protection, however care reviews and
care packages are under review by our local teams and
through the Care Resource Group process.
Inpatient services – addition of a consultant This Consultant post has just become vacant and in the    
Mental Health

Page 16

16 
psychiatrist for the inpatient unit 3 days per week.
Recruitment of Registered Mental Nurses remains
fragile due to the national shortage and the
inpatient environment holds large vacancies,
support around recruitment and retention 
is well under way across 
NHS Highland. 
process of being re-advertised. We are attempting to
source a locum in the interim period, and cover is being
provided by our sector General Adult Psychiatry 
Consultants. The inpatient ward remains very fragile,
recruitment continues to be very challenging. We secured
retention and recruitment premium of £5k per annum to
offer Band 5 RMNs to maximise recruitment opportunities
alongside the offer of shared accommodation in our
newly refurbed flats, however uptake to date has been
nil. Concentrated targeted communications and
advertising is ongoing to maximise our options.
Additionally, last year we developed our earn to learn
scheme, this scheme is in collaboration with open
university whereby we have recruited new Health Care
Workers specifically to train. This pilot has gained interest
and is being piloted in Tayside also, we hope to offer a
further 3 places this year to continue succession planning. 
Priorities Year 1  Progress
Establish immunisation teams to administer
vaccines in all localities and assess recruitment
priorities based on the impact on workload of
delivering Covid vaccines and the additional flu
vaccine cohorts.
Majority of vaccinations will be carried out by HSCP
nursing teams by March 2023.
Full flexibility for island practices to continue to provide
vaccinations.
Develop an HSCP model for travel health and travel
vaccinations.
Service Level Agreement with community pharmacists
has commenced in some areas.
Recruit to primary care nursing posts as agreed in
the Primary Care Modernisation Implementation
Plan to support community treatment and care and
some aspects of urgent care.
In progress
Implement transitional arrangements where
practices continue to provide some services.
In progress
Provide information of what services will not
transfer from GP practices as an outcome of the
rural options appraisal process. The Scottish
Government and Scottish General Practitioner's
Committee of the British Medical Association
(SGPC) will negotiate a separate arrangement
including funding for these practices who will
continue to provide services after 1 April 2022.
Agreement reached; discussions with the rural practices
ongoing.
Contribute to review of sustainable services on the
island of Coll.
Ongoing    
Primary Care

Page 17

17 
Priorities Year 1  Progress
Post-covid recovery.  All current clinics have recovered, but there remain staffing
pressures due to covid related absence. Staffing levels are
tight, but we remain flexible and will rearrange staffing at
short notice to accommodate clinics. There are rare times
when due to staff illness this is not possible.
Restarting all non-urgent care.  All no-urgent care restarted. Significant waiting times but
in line with rest of Scotland. This has no bearing upon
General Dental Service Provision.
Identification of service needs and associated
development. 
Service need identified: Kintyre and Mid Argyll area. There
is limited provision for Personal Dental Service (PDS)
services in these areas. Redesign of service provision to
allow flexibility and greater provision of dental care in this
region for priority groups.
National Dental Inspection Programme provision, which is
mandated by Scottish Government is challenging. Clinical
staff are being used to fulfil this at present
Development of current services for Island
communities and priority groups. 
Discussion with General Dental Practitioner Islay regarding
contracting to provide PDS careScoping Mobile dental
service (limited provision) and in collaboration with Coll
and Colonsay Communities.
Tiree dentist and DHT visiting Coll regularly. Mull clinic
remains extremely busy. Over 3000 patients registered.
Long waiting list. Only service provider on the island15 of
17 care homes have nominated dentist. (Islay and
Campbeltown – Islay potential for GDP to take over). 
Advanced care options for priority group’s patients –
General Anaesthesia or Intravenous (IV) sedation services
for complex care cases/anxiety cases. Currently no
provision for this within A&B staffing cohort. External
referral to NHSH North or GGC is only route for these
patients. 
Increasing access for patients in assisted and
looked after accommodation settings. 
Domiciliary dental care has resumed. Caring for Smiles
Programme for Care Home staff has resumed. 14 care staff
signed up to take qualification. Oral health care shop to
provide oral healthcare items at cost price to care homes
piloted and successful.
Increase skill mix in association with in-house
training and also NHS Education Scotland
partners. 
AWI training offered to all dentists. A either qualified or
allocated to training. Inhalation sedation training to
Helensburgh, Dunoon and Oban. Associated support staff
identified for training.
Clinicians peer review group meetings – Continuing
Professional Development
Motivation, Action and prompts (MAP) behaviour change and
Oral Health improvement training for all Public Dental
Service sites.
Team building.  Regular team meetings and 1 to 1 meetings as standard.
Senior Management Team to Mull for team building  
Dentistry

Page 18

18 
exercise
Standardising processes.  Single point of referral in final stages with Scottish Care
Information (SCI) gateway
Standard Operating Procedures.
Fixed term recruitment in Orthodontic services.  Unable to recruit. Accessing Consultant services on temp
contract (weekends currently). Looking at agreement with
NHSH North for permanent solution for weekday clinics. 
Scoping of in-house development of SDO for
Orthodontic services.
Senior Dental Officer development underway. Mentoring
by Consultant in NHSH North
PAYs in establishment take to advert to increase
staffing numbers. 
Complete. Meeting with finance in 2 weeks to review.
Capital funding application for service
improvements.
Capital funding applications being prepared Tiree, Mull,
Mobile Dental equipment.
Co-located sites, increase communication with
corporate bodies and GDP services.
Lines of communication open to facilitate good working
relationships. 
Priorities Year 1  Progress
The ADP strategy.  The work of the ADP is informed by a strategy that
covers the period of 2020-2023. The strategy has 4
pillars:
1. Prevention and early intervention
2. Developing recovery-oriented systems of care
3. Getting it right for everybody
4. Public health approach to justice
Updates on some of the work covered under this
strategy is provided below however the majority of
updates are provided under the remaining ADP
priorities below. 
Planet Youth
The ADP provided funding for two secondary schools
to take part in the Planet Youth approach to
substance use prevention through a community
collaborative approach. Planet Youth surveys were
used to inform strategies within each of the schools
and communities. This baseline data is important for
measuring the impact of this approach and will allow
schools to identify priority areas for development. 
This work is ongoing and additional funding will allow
this to be rolled out to further secondary schools. 
S3 Drama “You Are Not Alone” 
The ADP continues to contribute funding to the S3
Drama which is delivered across secondary schools in
Argyll and Bute.  This has continued to be delivered
via a filmed performance. The performances provide
an opportunity for young people to engage in          
Alcohol and Drug Partnership (ADP)

Page 19

19
questions, understand support that is available and
connect with other services.  Planning for the return
of the live performance for March 2023 is already
underway.  The ADP also offer professional learning to
education staff in relation to substance misuse to
support staff in the development of high quality and
relevant PSHE programmes. 
The ADP work in line with the strategy and a strategy
refresh for 2023-2024 is being developed following a
successful ADP strategy day in February 2023.
Initiate MAT standards.  The Drug Deaths Taskforce was set up in September
2019 and prioritised the introduction of standards for
Medication Assisted Treatment (MAT).  The aim is to
reduce deaths, and other harms and to promote
recovery.  The standards provide a framework to
ensure that MAT is sufficiently safe, effective,
acceptable, accessible and person centered.
In discussion with the MAT standards Implementation
Support Team (MIST), partners produced a project
specification document to initially implement MAT in
Cowal & Bute.
Dedicated co-located teams will work in partnership
to provide appropriate and evidenced access to
medication assisted treatment that promotes harm
reduction and a whole person approach.
The MAT steering and implementation groups
continue to meet regularly to progress the
implementation of the standards in Cowal and Bute. 
Learning from this will be used to scope roll out to
other Argyll and Bute areas, a process which is
supported by Public Health Scotland and Healthcare
Improvement Scotland.
Increase access to residential rehab.  A new residential rehabilitation pathway has been
developed for use in Argyll and Bute, to support those
seeking residential rehabilitation and/or
detoxification. This was developed via a Residential
Rehabilitation Group, which was formed to ensure all
partners who would be involved in care and support
before and after residential rehabilitation would be
involved in the discussions to enable clients to
maintain the benefits of residential rehabilitation. 
This is a partnership of third sector, NHS and Council
member.  Historically referrals to residential
rehabilitation were made only to Phoenix Futures in
Glasgow and Kings Court in Tighnabruaich, the
number of organisations that can be referred to has
increased.
The pathway encourages pre and post rehabilitation

Page 20

20
support to maximise support for the individual. In
financial year 2021-22 eighteen people were
approved for residential rehabilitation and/or
detoxification, twelve were men and six were women.
Develop a revised approach for children and young
people’s support. 
The existing school-based support service continued
to deliver throughout 2021/22.  There was evidence
that the interventions resulted in improvements in
young people’s lives and had a positive impact on
families.
A needs analysis was carried out in 2021 by an
independent organisation to map and match current
service, identify service gaps and adapt or commission
new services to meet the identified needs of young
people across all communities.  Work is ongoing to
respond to the needs identified.
Initiate the whole family approach strategy.  Argyll & Bute’s first Family Support group was
established, with the support and funding from the
ADP, in Helensburgh in October 2018 by two family
members with experience of caring for and living with
someone with drug and/or alcohol dependency
issues.  With their support, a second group was
established in Dunoon. Work is ongoing to implement
the Whole Family Approach across all localities of
Argyll and Bute.
Increase access to advocacy.  A partnership was established by the ADP involving
Lomond & Argyll Advocacy Service, Scottish Recovery
Consortium and Reach Advocacy to train people with
lived experience as Peer Advocates (recovery
advocacy peers).  The partners successfully recruited
and trained 4 individuals from across Argyll and Bute
as Lived Experience Advocates.  All four successfully
completed the Reach Advocacy Rights Based
Approach SQA Advocacy Award. Advocates work
closely with the substance use support teams in
localities supporting the needs of their communities
and encourage people to access the types of supports
that enable their recovery journeys.
Lomond and Argyll Advocacy Services will play an
important role in the delivery of MAT Standards in
Argyll and Bute and the recovery advocacy Team will
also all complete interview training, interviewing
service users about their experiences of MAT.                                           
The Group Recovery Advocacy’s work has been
valuable and the voices of people in recovery have
helped shape some developments and improvements
within Argyll.  
Scottish Recovery Consortium aim to establish a

Page 21

21 
National Network of Peer Advocacy Services and will
look to Argyll and Bute as a model of good practice. 
The combination of national and local based partners
helped secure the funding for this project and it is
hoped the establishment of a National Network will
help develop and support this service as we move
forward.
Work with criminal justice to create a continuation of
shared care. 
The ADP, in partnership with Community Justice,
Criminal Justice, Police Scotland and We Are With
You, established a Police Custody to Community
pathway for people who wished to speak to a
member of staff from We Are With You.
The offer of support is not limited to those with
identified needs associated with their use of alcohol
or drugs but, by using the ADP Recovery Orientated
Systems of Care (ROSC), can link into a wide range of
services and opportunities.  We Are With You function
as a first point of contact and link people into the
appropriate service providers on their release from
custody. 
A pathway has been developed to allow continuation
of care and Opioid Substitution Treatment (OST) for
someone who is entering prison.  If an individual is
admitted to prison, there is contact between the
prison and the service prescribing OST to confirm
both the prescription and the willingness of the
service to continue this on release.  Due to the
challenges of the pandemic, this pathway requires
review.
The ADP and Community Justice continue to work on
the development of the pathways for those people
leaving Prison and returning to Argyll & Bute.  Central
to this is the need to ensure all are provided with
Naloxone on liberation and continuity of care where
OST is prescribed.  Argyll & Bute prisoners can be held
in a range of prisons and work is ongoing to ensure an
equitable approach.  Prior to release from prison,
contact is made to substance use service providers in
order to continue with any clinical treatments in the
community. This has worked well for the continuation
of prescribed methadone and buprenorphine.

Page 22

22 
Priorities Year 1  Progress
Continue to develop standard tools and process
for establishment setting ready for cycle three.
Agree establishments for A&B teams. 
First cycle reported to SLT and supported with investment
and service redesign requirements over next year. Cycle
two planned spring 2023. Health & Care Staffing Act
implementation in 2024.
Develop a dashboard for visible demand and
activity data for AHP teams. 
Work underway with Performance Management Team.
IMPF submission for AHP’s complete.
Working on process for collating all AHP minimum data
for analysis.
Work with MS365 for daily activity App
Scope offer of first contact physiotherapy to
remote and rural practices.
Project progressed with fixed-term band 7 physio to
establish plans for smaller practices. Currently 16 out of
31 practices have FCP service which is 80% of Argyll and
Bute’s total Population
All AHP staff to do Health Behaviour Change
training and review the professions offer to
prevention.
Training offered, 6 AHP attended, plan in place to recruit
further staff for TURAS module.
Service pressures have impacted.
Review of recruitment within AHP professions and
enhance skill set opportunities g. Increase
number of advanced practice roles, therapy
assistant support to qualify as an AHP. 
New admin & assistant roles being trialled in Occupational
Therapy, Podiatry, Learning Disabilities and Paediatrics.
No progress with work-based professional
apprenticeships due to national issues. Increasing number
of overseas recruits. 
Priorities Year 1  Progress
Continue to work closely with our Carer Centre
Services to deliver on A&B Caring Together Strategy.
We continue to meet regularly, attend training and
development events.
We will develop a Carer APP which will assist in the
sharing of information and provide guidance to
carers. 
Young Carer App developed and now in use.
There will be a learning and development plan to
support implementation and knowledge of the
Carers (Scotland) Act.
In progress
There will be multi-agency guidance for our
workforce on identifying, supporting, listening to
and involving Carers during the planning of services
and recognising their involvement as an equal
partner in care. This will include guidance on how we
communicate and work together.
Developed and out for feedback. Will be in place by end
of April.
Develop and implement processes to ensure that
Carers Support Plans, Young Carers Statements, and
Emergency Plans are completed, and the
information is shared across all services as agreed.
Completed
We will increase Communication and engagement;
ensuring carer’s voices are heard. Produce an
In Progress      
Allied Health Professionals (AHP) 
Carers

Page 23

23 
Engagement framework.
We will work collaborative with Carers and Carer
centres to create a Carer Pathways. 
Completed
We will work to develop guidance to support carer
visibility and involvement prior to hospital discharge.
Completed , Poster, Leaflets
Review and update of our Caring together strategic
plan.
Delayed as awaiting the new National Carer Strategy. 
Increase our involvement with education and raising
Young carer Awareness.
Brought forward from year 2 completed. 
Priorities Year 1  Progress
Establish Health Behaviour Change training within
the HSCP. 
Health Behaviour Change training has been rolled out 
Communication & engagement plan developed and
rolled-out. 
Changed to Co-production of Community assets
(Strand 2 of programme) 
A co-production plan has emerged with partners in Live
Argyll, Argyll & Bute Council, MacMillan & Third Sector
Interface. We are engaging with Living Well Networks and
Locality Planning Groups. Co-production planning is
arranged top focus on delivery of the Living Well Strategy
priorities with a focus on building community assets.
Collate ideas to increase prevention and early
intervention in preparation for National Care
Service roll-out. 
(Strand One of programme) We have drafted an options
appraisal around developing a 12 week Wellbeing &
Physical Activity programme and are progressing to
exploring funding opportunities. 
Priorities Year 1  Progress
Implement the new ECLIPSE IT system and increase the
number of community health staff using the single
health and social care IT system.
On course for completion May/June 23.
Join up our HSCP teams by improving NHS systems and
Council systems for easier data sharing. Enhance
communication and collaboration using MS Teams
federation.
Phase 1 of federation completed. Provides instant
messaging, calendar access and presence
management. Phase 2 of this national project
timescale still to be agreed
Complete the final phase of our “Drone” beta service
for clinical logistics in the West of Argyll leading
national innovation in the use of this technology in the
Scottish Health service. 
Phase 1 and 2 complete. Phase 3. In essence this is a
6 month “Beta test” with a live logistics delivery
service programme. This would be the final stage of
establishing the integration of “beyond visual line of
sight” (BVLOS) drones into our normal clinical
logistics transport network.      
Digital Health and Care Strategy 
Prevention Programme

Page 24

24 
Priorities Year 1  Progress
Work on finding a digital solution within the pilot
area. 
Digitally ready devices are being rolled out both as and
when clients switch to a digital line and for all new
clients in the Oban and Mull areas. 
Continue to promote digital care across the HSCP
ensuring no digital exclusion in Argyll & Bute. 
We continue to promote our service utilising
newsletters, roadshows etc and working alongside
colleagues to ensure familiarity with digital care
solutions available. Digital exclusion is still an ongoing
issue and will be nationally, we know for some of our
more remote residents eg those living on the islands
this is a risk and we are working with the LPGs, Living
Well Coordinators etc to ensure this is minimised.
Ensure TEC is a core service embedded in all aspects
of delivery of care. 
We are working to ensure TEC is wrapped round our
patients and clients at every stage of care delivery. We
have Technician presence at MDTs, virtual ward
meetings etc. we are cross referencing hospital
admissions with TEC clients, which allows us to
prioritise those most in need. 
Encourage promotion of all services throughout
patients/clients journey. 
We recognise the changing need of patients and clients
as they journey through services, we are working to
promote remote health monitoring across primary
care, TEC based solutions when patients require
secondary care and ensure this support is ongoing.
Supporting colleagues to feel more comfortable
using TEC available as a resource to support their
delivery of care and free up time for direct patient
care. 
We continue to work to upskill colleagues to work with
TEC. Examples of this are the work we are doing to
address those on the unmet need list, working with the
Mental Health teams to direct referrals into the
Silvercloud programme. Frequent callers will be
highlighted.
Continue to develop NHS Near Me clinics to support
clinicians in delivering remote clinics and supporting
patients to attend appointments without the need to
travel. 
We are promoting the use of Near Me wherever
possible, working with the islands in particular as part
of the Digital Hub development. Promotional materials
are being heavily utilised to increase awareness of the
option to have consultations and appointmens via Near
Me, especially when these are to occur in Glasgow
sites. 
Priorities Year 1  Progress
Identify estate rationalisation opportunities as part of
Councils “Our Modern Workspace” project. 
This work is ongoing within the Council with the creation
of “Working from Home” policies to support new ways of
working.
Implement the new ECLIPSE IT system and increase the
number of health staff using the single health and social
care IT system.
On course for completion May/June 23.
Join up our HSCP teams by improving NHS systems and Phase 1 of federation completed. Provides instant     
Technology Enabled Care (TEC) 
Coporate Services

Page 25

25
Council systems for easier data sharing. Enhance
communication and collaboration using Microsoft Teams
federation.
messaging, calendar access and presence management.
Phase 2 of this national project timescale still to be agreed.
Obtain funding and expand our electric vehicle charging
point infrastructure by 30 and our electric vehicles by 35.
The HSCP will have installed 30 additional charging points
across A&B and has placed an order for 53 Electric
vehicles.
Complete the final phase of our “Drone service” beta
service for clinical logistics in the West of Argyll leading
national innovation in the Scottish Health service. 
Phase 1 of this project, a proof of concept, was conducted
in June 2020 Phase 2 piloting a “live” service in February to
May 2021 covering Mull and Iona Community Hospital,
Easdale Surgery, Mid Argyll Community Hospital and
Integrated Care centre Lochgilphead and Lorn and Islands
Rural General Hospital Oban. Following the success of
these previous phases, the Unmanned Drone Logistics
project is moving to its final critical test stage – Phase 3. In
essence this is a 6 month “Beta test” with a live logistics
delivery service programme. This would be the final stage
of establishing the integration of “beyond visual line of
sight” (BVLOS) drones into our normal clinical logistics
transport network. Skyports has obtained funding from
the European Space Agency and the UK Space Agency to
operate this service under a “Transponder Mandatory
Zone” (TMZ) airspace structure which would be the first in
the UK to be used for BVLOS medical deliveries. What this
means is that crewed and un-crewed aircraft such as the
drones operating in this project can fly together in
unsegregated airspace. This allows us to move away from
restricted air corridors which other aircraft cannot access
while greatly improving the integration of un-crewed
aircraft into current airspace structures. This integration
piece is the crucial ‘unlocker’ of permanent BVLOS drone
medical deliveries in the UK.

Page 26

26
Performance Management and
Governance 
Introduction
This year has seen the move from the post-COVID remobilisation of services using the
designated Framework for Clinical Prioritisation to focussing on the management and
reduction of Long Waits and preparation for winter pressures.  From October onwards
health and social care services across Scotland experienced an extensive increase in the
prevalence of Flu, Covid19 in addition to expected winter illness and system pressures. 
As such the Scottish Government Health Department directed HSCPs to focus on additional
actions and performance measures to look at the impact of additional funding and address
these pressures. A National Response Group was established to monitor and drive
improvement with regards to the reduction of Delay Discharge across Scotland to support
the acute inpatient pressure and enhance flow patient through hospitals. Both HSCPs and
Health Board were required to adopt five key action areas to address these pressures,
alongside monitoring and reporting of additional performance measures to evidence impact
and support progress.
The five areas of focus were:
1. Delivering a different model of care for a short period, e.g. move to critical/life-
saving care only and postponing planned activity. 
2. Opening / procuring additional capacity in social care e.g. intermediate care beds. 
3. Moving staff to areas of pressure across acute and community and care services. 
4. Increased engagement with 3rd sector providers commissioning enhanced services
to address unmet care need and prevent admission. 
5. Lighter touch governance arrangements with regard to criteria for discharge and
inspections 
Integrated Performance Management Framework (IPMF)
The focus for 2022 has been the development of the Integrated Performance Management
Framework to ensure that the drivers for performance improvement are those that matters
most to the service both operationally and strategically.  The overall focus of the IPMF was
to establish a collaborative performance framework that offered improved performance
visibility across the HSCP and real ownership. This steps away from previous traditional
management of performance and replaces the Pyramid Balanced Scorecard, the IPMF is
scheduled to go-live in April 2023.  The new governance arrangement will mean that future
performance reporting will be scrutinised by the Clinical & Care Governance Committee

Page 27

27
The monitoring and reporting of performance using the IPMF ensures the
HSCP is able to deliver against key strategic priorities, national data
demands and the Strategic Plan objectives and service priorities;
Key Performance Overview  
This overview uses calendar year (Jan- Dec) for 2022, this ensures that there
is data continuity linking previous and new reporting using full year data. Latest
performance against the IJB Scorecard measures is presented at Appendix 1. Note this is
impacted by unavailability of data – we are awaiting advice from Public Health Scotland
(PHS) on the publication and use of National Indicators reported within the Health and
Wellbeing Outcome Indicators (HWBOI) and Core Suite data. PHS has confirmed 2022
update will not be available until Jun 2023 earliest. PHS also advise that Ministerial
Steering Group data is impacted by Scottish Morbidity Record (hospital episode /
admission records) completeness across a six month lag period, therefore any data
reported within this lag period should be treated with caution. 
Benchmarking
Benchmark performance makes a comparison with the seven identified rural HSCP’s and
against the Scottish average. Performance across the 20 HWBOI, Argyll & Bute HSCP noted
** (**%) indicators performing above the Scottish average. Performance against the other
HSCP’s for these indicators notes that Argyll & Bute had an overall **% success rate
(Appendix 2) 
** Note we are awaiting further advice from PHS on publication and use of National
Indicators reported within the HWBOI and Core Suite data. PHS has confirmed 2022
update will not be available until Jun 2023 earliest. 
Waiting Times & Long Waits
On average the overall number of people on the Out Patients Waiting List (OPWL)
has seen an increased by 36% across 2022 against previous years data. This is
show in terms of a monthly increasing trend across the year, with the lowest
recorded in February (n=1268) against a peak of (n=2130) for December   
Across 2022 the overall number of people on the OPWL breaching beyond 12 weeks has
increased by 150% for 2022 against previous years data. This is represented by monthly
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 1364 1268 1500 1466 1627 1783 1926 1866 1870 2035 2026 2130
2021 1266 1211 1122 1290 1259 1287 1316 1311 1314 1357 1284 1323
0
500
1000
1500
2000
2500
New OPWL - 2021 & 2022
2022 2021 Linear (2022)

Page 28

28
increasing trend across the year, with the lowest recorded in February (n=286) against a
peak of (n=750) for December. 
The overall number of people on the OPWL Long Waits breaching beyond 52 weeks has
decreased by 69% across 2022. This is reflected by a monthly decreasing trend across the
year with a peak of (n=13) for January and the lowest recorded point in December (n=4). 
Homecare
For  2022 there was a 2.7% increase across the year with regards
to the total number of homecare hours against the previous year,
this was offset with a slight reduction in the average number of
homecare clients in receipt of a service. Peak months for the
delivery of the homecare hours were March to July with a
reducing trend from July (n=103,574) to November (n=95,841). 
Trend analysis for 2022 with regards to overall number of
homecare clients in receipt of a service noted an increasing trend from February (n=1481)
peaking in July & August (n=1588). From August there is a rapid decrease in the overall
number dropping to (n=1482) in December. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 300 286 317 335 369 435 448 415 504 563 579 750
2021 471 427 299 302 272 245 244 277 311 323 276 309
0
200
400
600
800
New OPWL Breaches > 12 Weeks - 2021&22
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 1,509 1,481 1,494 1,510 1,534 1,548 1,558 1,558 1,525 1,522 1,492 1,482
2021 1,550 1,534 1,549 1,525 1,517 1,522 1,499 1,513 1,516 1,519 1,514 1,509
1,400
1,450
1,500
1,550
1,600  
Number of Homecare Clients 2021 & 2022
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 13 6 6 4 9 10 10 9 5 4 7 4
2021 98 105 93 84 78 56 47 48 36 35 22 17
0
50
100
150
OPWL Long Waits  > 52 Weeks - 2021&22
2022 2021 Linear (2022)

Page 29

29
Residential Care
Performance with regards to the total number of people in residential
care notes a relatively flat trend for 2022, with an overall 2% reduction in
the total number of people in a care home against previous year
performance. June to September suggests some potential seasonality in
the data with this year and the previous year sharing a reducing trend
across October to December 
Delayed Discharge
Delayed discharge performance for 2022 notes an increasing trend across
the year with a 53% increase in the average number of delays when
compared against data for 2021. Alongside this was a 66% increase in the
average bed days occupied by those delays.  Monthly performance noted
seasonal increases in March, October and December, this pattern is
replicated in the 2021 data. Statistically across each month the increase in
bed days occupied was not directly attributable to an increase in the overall
number of delays, peak months were July, October and December.  May
and June noted a small increase in the number of delays but with a
significant increase in the time beds were occupied. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 549 554 570 564 563 557 552 561 564 574 559 557
2021 598 594 611 611 569 548 558 556 557 553 556 546
500
520
540
560
580
600
620
Number of People
Months
Number of Care Home Residents 2022 & 2021
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 478 388 434 419 435 475 734 687 586 894 663 860
2021 413 197 246 141 112 241 315 363 324 535 287 370
0
200
400
600
800
1000
Bed Days Occupied in Month 2021 & 2022
2022 2021 Linear (2022)

Page 30

30
Adult Support & Protection
From the most part duty to enquire activity noted a very similar trend as the
previous year, with a variance increase in 2022 from May to August.  This
increase in activity was recovered from September onwards with both years
noting a slight decreasing trend for November to December.  On average duty
to enquire activity was reduced by 13% for 2022 as compared to 2021 and
with regards to Investigation and Risk Assessments completed, notes a 5%
increase for 2022 against the previous year. 
Resilience in Care at Home (Unmet Need) 
The reporting of unmet need commenced in August 2021 in line with a
weekly requirement from the Scottish Government. Part of this return
looks at the number of people waiting for a care package and the
associated hours. Average data for 2022 across the number of people
noted (n=64) for the year against an average of (n=591) hours.
Comparison with the previous year 2021 is limited due to the part year
data available. The trajectory for the number of people waiting noted a
slightly increasing trend, however there is not a strong correlation with
increasing weekly numbers of people and increases in associated care
hours.   
0
200
400
600
800
1000
3-Jan 3-Feb 3-Mar 3-Apr 3-May 3-Jun 3-Jul 3-Aug 3-Sep 3-Oct 3-Nov 3-Dec
Hours
Months
Number of People  & Hours of Care 2022
Number of people Hours  Linear (Hours )
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 19 36 32 30 21 31 39 45 23 29 49 32
2021 20 36 32 24 24 20 23 28 32 27 42 27
0
20
40
60
Numbers
Months
Adult Support & Protection- Duty to Enquire 
2021& 22
2022 2021 Linear (2022)

Page 31

31
Children & Families
Overall numbers of assessments completed for 2022 noted a 7% reduction, with
a relatively flat trend across the year.  The data notes variance across the year
and an erratic and reducing monthly trend from May onwards. There is a
suggested impact of seasonality with regards to a reduction in activity across
school holiday time, June and July.
With regards to the overall number of Care Experienced Children there was a 6% reduction
for 2022 against the previous year average.  Monthly trend analysis noted for 2022 an
increasing overall trend from June onwards, peaking in August with a relatively flat
performance up to and including December.   
The numbers of children on the child protection register noted a
decrease against previous year activity.  The average for 2022
noted a 35% reduction against the data for 2021, with a drop in
activity across June & July, suggestive of seasonality and potential
impact of school holidays.  The data identified four distinct
periods of increased numbers of children on the register across
the year February (n=35), March (n=28), May (n=29) and August
(n=27), although general monthly numbers remain statistically
low.  February notes the highest number of children registered, against (n=21) in November.
Initial contacts data identified a reducing trend for 2022 against previous year, this equates
to an overall reduction of 12% against 2021 data. The data for 2022 noted an erratic
monthly trend with the most significant reduction in contacts from May (n=319) to (n=90) in
December. This trend is in direct opposition to the previous increasing monthly trend for
2021 data. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 146 146 143 145 144 143 147 151 147 145 143 145
2021 164 161 159 157 156 150 152 151 150 151 151 147
130
140
150
160
170
Number of Care Exeperienced Children 
2021 & 22
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 33 35 28 27 29 24 22 27 25 22 21 22
2021 30 40 45 37 34 35 32 35 37 38 42 37
0
20
40
60
Number of Children on the Child Protection
Register- 2021 & 22
2022 2021 Linear (2022)

Page 32

32
Community Health
The number of community assessments commenced in the month noted
a gradual increasing trend for 2022, with an average overall yearly
increase (8.5%) in the number of assessments commenced against data
for 2021.  Trends across the months highlighted the highest number of
assessments were in May (n=12,251), this is a 1.4% increase against the
highest recorded monthly number (n=12, 076) in 2021. Previous volatility
in the monthly 2021 data is offset by a more stable baseline in 2022. 
Adult Care
Adult care initial contacts noted an average reduction of 18%
against data for 2021, this was countered by a general
increasing monthly trend peaking in November (n=496) from
a baseline of (n=322) in January.  Trend analysis across both
2022 and 2021 noted more stability for 2022 against an
erratic decreasing data trend of 2021.  Conversion of initial
contacts to assessments highlighted a 24% overall average reduction for 2022 against the
previous year.  The trend across the year was relatively flat in trajectory, peaking in March
(n=263). 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 322 361 429 387 438 405 410 410 402 445 496 360
2021 632 641 645 481 573 427 455 504 344 384 411 333
0
100
200
300
400
500
600
700
Adult Care Initial Contacts 2021/22
2022 2021 Linear (2022)
0
5,000
10,000
15,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Community Assessments Commenced in the
Month  2021 &22
2022 2021

Page 33

33
Technology Enabled Care & Falls 
Telecare performance for 2022 noted a 1.5% increase against the
previous year performance with regards to the actual number of
clients in receipt of a service. From Jan- May the overall trend was
flat, from June there was a sustained increase in numbers peaking at
(n=1955) in October against (n=1906) for the same month in the
previous year. 
On average the overall number of falls recorded within the context of a Technology Enabled
Care response reduced by 6% for 2022 against previous year data. The drop in overall
reporting was against a monthly increasing trend across the year with the lowest recorded
in January (n=46) against a peak of (n=83) for December. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 1921 1922 1910 1918 1917 1945 1942 1953 1947 1955 1951 1952
2021 1898 1916 1915 1930 1880 1906 1920 1924 1915 1906 1915 1922
1840
1860
1880
1900
1920
1940
1960
1980
Number of Clients in Receipt of Telecare 
2021 & 2022
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 46 63 65 67 55 55 80 78 61 67 69 83
2021 69 77 94 88 68 76 67 72 60 63 46 59
0
20
40
60
80
100
Telecare Recorded Falls- 2021&22
2022 2021 Linear (2022)

Page 34

34
Child & Adolescent Mental Health & Psychological Therapies
Whilst CAMHS performance for the year 2022 noted an overall reduction of 14% of people
on the waiting list compared with 2021, there has been an increasing trend in the latter part
of 2022, with months Sep-Dec reporting 53% increase against the August low point. 
On average the overall number of children on the CAMHS waiting list fell
by 14% for 2022 against previous year’s data. The drop in overall
reporting is against a monthly decreasing trend across the year with the
lowest recorded in August (n=71) against a peak of (n=263) for May. This
decrease reflects a period of systems data cleansing with a focus on
legacy PMS system recorded waits. 
On average the overall number of waits for Psychological Therapies rose by 19% for 2022
against previous years data. Overall reporting indicates a monthly decreasing trend across
the year with the lowest recorded in December (n=244) against a peak of (n=304) for
February
Winter & Systems Pressures
Since Jan 2023, Winter & Systems Pressures have been monitored in line with the SG
Integrated Performance Framework focussing on Resilience in Adult Social Care, looking
closer at patient flow through Urgent & Unscheduled Care, increased support for Interim
Care Home Placements, and improving the rate of Discharges without Delay. Argyll and
Bute’s current performance in these areas is presented in Appendix 3. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 212 239 224 257 263 168 142 71 90 97 101 109
2021 188 169 188 150 181 187 186 196 230 244 191 207
0
50
100
150
200
250
300
CAMHS - 2021&22
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 293 304 291 294 294 288 296 290 289 266 244 244
2021 173 186 202 254 265 288 184 218 206 219 261 290
0
50
100
150
200
250
300
350
Psychological Therapies 2021&22
2022 2021 Linear (2022)

Page 35

35
Financial Performance and Best Value 
Financial Performance
The IJB is committed to the highest standards of financial management and governance. It is
required to set a balanced budget each year and seeks to deliver Health and Social Care
Services to the communities it serves within the envelope of resources available to it.
Financial performance is reported in detail to the IJB at each of its meetings and to its
Finance and Policy Committee which meets on a monthly basis. It also publishes its Annual
Report and Accounts which are subject to independent external audit. 
This section provides a summary of financial performance for 2022-23, our approach to
ensuring that we deliver Best Value and outlines the future financial outlook and perceived
risks.
Financial Performance 2022-23
The IJB set a balanced budget for 2022/23, and is delighted to be able to report an
underspend against the resources made available to it during the year. This is an excellent
outcome as it enables the HSCP to progress key Transformation projects and importantly
helps it manage the financial challenges facing the health and social care sector in future
years. It is acknowledged that a number of factors contributed to this improved position
including delivery of savings, improved financial management and governance and
additional funding allocations from the Scottish Government. It is also the case that the
HSCP has continued to experience difficulties in recruiting staff during 2022/23 which has
contributed to the positive financial position but has resulted in on-going service challenges.
The final revenue outturn for 2022/23 was an underspend of £9.1m against the resources
available to the HSCP, which totalled £341m. This underspend has been retained by the
HSCP within its general reserve and it is intended that it will be invested in 2023/24 on
service transformation and will enable to HSCP to cover its budget gap in 2023/24 from
within its own resources. The following table summarises the financial performance against
budget analysed between Health and Social Work related services. 
Service Actual 
£
Budget
£
Variance 
£
Variance 
%
Social Work Services 89,184 92,740 3,556 3.8%
Health Services 242,496 242,497 5,542 2.2%
Grand Total 331,680 340,778 9,098 2.7% 
The budget for 2022/23 included a savings target of £6.1m, of this target £4.2m or 68% of
the savings programme was delivered.  This mean there are a number of savings projects
that the HSCP requires to deliver in 2023/24. It continues to manage its savings programme
rigorously and is committed to service transformation and to ensuring the sustainability of
the services it offers and its longer term financial sustainability. The HSCP has a new savings
target of £6.8m for 2023/24, delivering this, as outlined in the Value for Money Strategy, is
in addition to delivery of the £1.9m of savings not achieved in 2022/23. The HSCP has also
identified a number of other Value for Money priorities within its strategy including work
relating to the funding model for rural and island communities.

Page 36

36
Financial Outlook, Risks and Plans for the Future
The IJB has a responsibility to make decisions and direct service delivery in a
way which ensure it operates on a financially sustainable basis within the finite
resources available to it. There are significant on-going cost and demand
pressures across health and social care services as a consequence of demographic change,
new treatments, increasing service expectations and on-going high inflation. Managing
these pressures and funding uncertainty is becoming increasingly difficult, the real value of
budgets continues to be eroded by price and cost increases. There is on-going requirement
to improve efficiency, deliver savings and transformation plans. 
The HSCP continually updates its forward financial plans to recognise and plan for the
impact of new policy priorities, emerging cost pressures and funding allocations.
Additionally, robust risk management processes are in place which seek to identify and
quantify the financial risks facing the HSCP. Key risks currently facing the partnership include
the sustainability of service providers, the impact of inflation, staff availability and costs, and
increasing demand for services. A further key risk is in respect of the increased numbers of
people who are awaiting diagnosis and treatment. 
The Annual Report and Accounts for the year provide further detail and analysis in respect
of financial performance, financial risks and governance arrangements and improvement
plans. 
Best Value 
The IJB has a statutory duty to provide best value as a designated body under
section 106 of the Local Government (Scotland) Act 1973. NHS Highland and
Argyll and Bute Council delegate funding to the Integration Joint Board (IJB).
The IJB decides how to use these resources to achieve the objectives of the
strategic plan. The IJB then directs the Partnership to deliver services in line
with this plan. 
The governance framework represents the rules and practices by which the IJB ensures that
decision making is accountable, transparent and carried out with integrity and in line with
the principles of public service. The IJB has statutory responsibilities and obligations to its
stakeholders, staff and residents of Argyll and Bute. 
The Health and Social Care Partnership ensures proper administration of its resources by
ensuring that there is an appropriate governance framework in place and by having an
appointed Chief Financial Officer who is required to keep proper accounting records and
take reasonable steps to ensure the propriety and regularity of the finances of the
Integration Joint Board. The IJB is also required to publish audited annual accounts each
year. 
Best Value underpins the ethos of governance and financial management within the IJB, a
summary of performance against the 8 best value themes is given overleaf:

Page 37

37

Page 38

38

Page 39

39
Appendices 
Appendix 1 IJB Scorecard 
(Note comments re availability of NI Indicators for 2022 and MSG completeness)     
Outcome 1 - People are able to improve their health 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-1 - % of adults able to look after their health very well or quite well  93.0%  93.0% 93.2% 90.8% 90.8% 90.9%
NI-3 - % of adults supported at home who agree they had a say in how their
support was provided    76.0%   76.0% 72.5% 66.9% 66.9% 70.60%
NI-4 - % of adults supported at home who agree that their health & care
services seemed to be well co-ordinated   72.0%  72.0% 73.7% 66.0% 66.0% 66.40%
NI-16 - Falls rate per 1,000 population aged 65+   26.0  23.0  25.3 27.8 27.8 23
A&B - % of Total Telecare Service Users with Enhanced Telecare Packages  45.7% 45.6% 43.2% 41.2% 31.0%
NI-13 - Emergency Admissions bed day rate  108883 109,759  94,863 104,253 104,253 109,429
Outcome 2 - People are able to live in the community 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
*MSG 1.1 - Number of emergency admissions - A&B  9,003 9,111 7,563 8,343 8,396 8,509
*MSG 2.1 - Number of unplanned bed days acute specialties - A&B  67,060 66,706 55,378 65,475 71,325 57,139
*MSG 2.2 - Number of unplanned bed days MH specialties - A&B  14,623 12,676 12,732 9,868 9,306 15,896
*MSG 3.1 - Number of A&E attendances - A&B  16,912 17,784 12,671 17,114 20,283 16,960
*MSG 6.1 - % of 65+ population  at Home (unsupported) - A&B    8.0%   7.9% 7.9% 7.5% 7.5%  8.1%
A&B - % of LAC who are looked after at home or in a community setting 82.4% 80.6% 83.6% 87.0%  90.0%
Outcome 3 - People have positive service-user experiences 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-2 - % of adults supported at home who agree they are supported to live as
independently    79.0%   79.0% 79.9% 75.0% 75.0% 78.8%
NI-5 - % of adults receiving any care or support who rate it as excellent or good   80.0%  85.0% 78.3% 68.6% 68.6% 75.3%
NI-6 - % of people with positive experience of their GP practice   85.0%  85.0% 84.5% 77.6% 77.6% 66.5%
*MSG 3.2 - % A&E attendances seen within 4 hours - A&B  93.4% 91.7% 93.1% 88.9% 83.3% 95.0%
CA72 - % LAAC >1yr with a plan for permanence 65.0%  85.2% 65.4% 67.1% 95.2%  81.0%
Outcome 4 - Services are centred on quality of life 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-7 - % of adults supported at home who agree their support had impact
improving/maintaining quality of life   74.0%  74.0% 76.50% 76.7% 76.7% 78.10%
NI-12 - Rate of emergency admissions per 100,000 population for adults  12,678 11,353 10,790 11960 11960 11,636
NI-14 - Readmission to hospital within 28 days per 1,000 admissions  87.0  76.0 91.0 91.0 91.0 110
*MSG 5.1 - % of last six months of life by setting community & hospital - A&B  90.0% 90.8% 92.40% 90.8% 90.8%  90.0 %
A&B - % of Waiting Time breaching >12 weeks 21.0% 38.0% 22.0% 37.0%  25.0%
IJB Perfomance Scorecard for Annual Performance Report

Page 40

40 
Outcome 5 - Services reduce health inequalities 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-11 - Rate of premature mortality per 100,000 population  393 403 398 386 386 465
NI-17 - % of SW care services graded ‘good’ '4' or better in Care Inspectorate
inspections    86.0%   84.1% 87.1% 80.0% 80.0% 75.8%
NI-19 - No of days people [75+] spent in hospital when ready to be discharged,
per 1,000 population  640 540 346 584 584 761
CPC01.4.4 - % Waiting time from a patient’s referral to treatment from CAMHS 91.0% 92.5% 100.0% 80.0% 84.6% 90.0%
AC21 <=3 weeks wait between SM referral & 1st treatment 90.5% 91.3% 84.9% 80.0% 75.0% 90.0%
Outcome 6 - Unpaid carers are supported 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-8 - % of carers who feel supported to continue in their caring role   33.0%   33.0% 35.0% 38.0% 38.0% 29.7%
Outcome 7 - Service users are safe from harm 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-9 - % of adults supported at home who agree they felt safe    83.0%   83.0% 78.7% 76.4% 76.4% 79.7%
CP16 - % of Children on CPR with a completed CP plan 91.0% 89.0% 99.0% 99.0% 95.0% 100 %
CP43 - No of Child Protection Repeat Registrations - 18 months 0 0 0.0% 0.0%   0
CJ63 - % CPO cases seen without delay - 5 days 84.8% 95.6% 95.3% 85.3% 59.5%  80.0%
A&B - % of Adult Protection referrals completed within 5 days 45.8 % 39.50% 32.9% 20.0% 80.0%
A&B - % of Adult Protection referrals that lead to AP Investigation 12.5% 39.5% 11.0% 5.0% 10.0%
A&B - % of complaints [Stage 2] responded within timescale 25.0% 56.5% 73.0% 50.0% 20.0%
Outcome 8 - Health and social care workers are supported 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-10 - % of staff who say they would recommend their workplace as a good
place to work   71.0%  71.0% 70.0% 70.0% 70.0%  67.0%
SW only - HSCP Attendance 5.20  5.23 4.86 5.9 4.83 3.78 Days
Outcome 9 - Resources are used effectively in the provision of health and
social care services 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-15 - Proportion of last 6 months of life spent at home or in a community
setting  90.0%  91.0%   92.9% 91.3% 91.3% 90.1%
NI-18 - % of adults with intensive needs receiving care at home    67.0%  68.0% 72.3% 71.9% 71.9% 64.9%
NI-20 - % of health & care resource spend on hospital stays where patient
admitted in an emergency   22.0%  22.0% 19.2% 22.5% 22.5% 24.2%
*MSG 4.1 - Number of DD bed days occupied - A&B  9,530 8,237 5,338 7,006 11,083 8,604

Page 41

41
Appendix 2 HWBOI’s/ Benchmarking 
(Note comments in relation to PHS advice on National Indicators unavailable until Jun 2023) 
Indicator Title Argyll & Bute HSCP A HSCP B HSCP C HSCP D HSCP E HSCP F HSCP G Scotland
NI - 1 Percentage of adults able to look after their health very well or
quite well 90.8% 92.4% 92.6% 92.4% 92.1% 92.7% 93.4% 91.7% 90.9%
NI - 2 Percentage of adults supported at home who agreed that they
are supported to live as independently as possible 75.0% 72.6% 72.1% 86.5% 73.4% 79.3% 73.1% 72.5% 78.8%
NI - 3 Percentage of adults supported at home who agreed that they
had a say in how their help, care, or support was provided 66.9% 76.8% 60.6% 72.1% 70.5% 70.2% 63.4% 64.3% 70.6%
NI - 4 Percentage of adults supported at home who agreed that their
health and social care services seemed to be well co-ordinated 66.0% 78.5% 54.1% 71.9% 64.5% 62.2% 59.3% 61.7% 66.4%
NI - 5 Total % of adults receiving any care or support who rated it as
excellent or good 68.6% 79.5% 70.3% 83.0% 78.6% 68.1% 73.9% 67.8% 75.3%
NI - 6 Percentage of people with positive experience of the care
provided by their GP practice 77.6% 69.8% 64.8% 77.2% 62.0% 60.0% 65.9% 67.3% 66.5%
NI - 7
Percentage of adults supported at home who agree that their
services and support had an impact on improving or maintaining
their quality of life
76.7% 81.7% 63.1% 84.3% 80.6% 73.3% 70.5% 79.2% 78.1%
NI - 8 Total combined % carers who feel supported to continue in their
caring role 38.0% 29.5% 30.8% 28.7% 27.4% 31.6% 29.4% 25.6% 29.7%
NI - 9 Percentage of adults supported at home who agreed they felt
safe 76.4% 84.9% 69.5% 86.0% 78.8% 72.1% 77.3% 75.3% 79.7%
NI - 11 Premature mortality rate per 100,000 persons 386 419 375 407 407 401 348 408 465
NI - 12 Emergency admission rate (per 100,000 population) 11,960 10,460 10,789 9,997 11,861 9,381 10,577 12,564 11,636
NI - 13 Emergency bed day rate (per 100,000 population) 104,253 92,375 112,745 106,529 105,914 83,298 121,675 95,726 109,429
NI - 14 Readmission to hospital within 28 days (per 1,000 population) 91 114 110 113 111 87 102 138 110
NI - 15 Proportion of last 6 months of life spent at home or in a
community setting 91.3% 92.5% 87.5% 91.5% 88.5% 92.3% 88.2% 90.1% 90.1%
NI - 16 Falls rate per 1,000 population aged 65+ 27.8 24.2 23.7 14.5 26.5 19.0 18.9 23.1 23.0
NI - 17 Proportion of care services graded 'good' (4) or better in Care
Inspectorate inspections 80.0% 75.7% 77.1% 80.3% 78.0% 80.0% 77.9% 87.0% 75.8%
NI - 18 Percentage of adults with intensive care needs receiving care at
home 71.9% 60.8% 63.4% 56.6% 63.8% 64.5% 57.5% 71.2% 64.9%
NI - 19 Number of days people spend in hospital when they are ready to
be discharged (per 1,000 population) 584 226 159 1,051 520 776 1,009 761 761
NI - 20 Percentage of health and care resource spent on hospital stays
where the patient was admitted in an emergency 22.5% 23.2% 23.0% 23.1% 23.3% 21.3% 20.4% 23.2% 24.2%
Core Suite of National Integration Indicators for Annual Performance Report

Page 42

42 
Appendix 3 Winter & Systems Pressures Performance