ARGYLL AND BUTE COUNCIL  Mid Argyll, Kintyre and the Islands     
Area Committee
DEVELOPMENT AND ECONOMIC GROWTH  6 September 2023 
WHITE HART HOTEL: PROGRESS REPORT ON CONDIITON OF THE PROPERTY 
1.0 EXECUTIVE SUMMARY   
1.1 Purpose: This report provides members with an update on the works being carried
out at the former White Hart Hotel, Campbeltown in response to the Dangerous
Building Notice (Reference 23/00039/DS) that was served on the owner by the
Councils Building Standards section on the 9th May 2023.   
1.2 Background: The building has been unoccupied for some years and had fallen into a
state of disrepair. Responding to complaints, urgent work was carried out by building
standards on the 2 May 2023, using emergency powers under sections 29 and 30 of
the Building (Scotland) Act 2003, to remove imminent dangers to public safety. Heras
fencing was erected on the 3 May 2023 restricting access to the pavement area around
the building.  A Dangerous Buildings Notice was been served on the property owner
requiring them to “commission a structural engineer to assess the current structural
condition of the White Hart Hotel and carry out the structural works as specified by
the structural engineer to ensure that no structural issues are evident on completion
of the required works.”   
1.3 Current situation: The owner continues to carry out repair works to the property to
focus on the matters detailed in the Dangerous Buildings Notice, as well as other
general maintenance works which include the replacement and refurbishment of the
sash and case windows on front elevation, examination and replacement, as
necessary, of internal timber safe lintels and intermediate floor joints, and roofing
repairs. Meantime, regular briefings are being provided to local elected members
and public safety is being protected by heras fencing and pedestrian barriers as the
required works are being carried out by the owner. 
1.4 Financial: The property owner is cooperating with building standards and works are
being carried out at their expenses. The costs incurred by the Council to protect public
safety and initial hire of heras fencing will be recovered from the owner. 
1.5 Recommendation  
Members are asked to consider and note the progress being made to improve the
condition of the White Hart Hotel

Page 2

ARGYLL AND BUTE COUNCIL  Mid Argyll, Kintyre and Islay
Committee
DEVELOPMENT AND ECONOMIC GROWTH  6 September 2023 
WHITE HART HOTEL: PROGRESS REPORT ON CONDIITON OF THE PROPERTY 
2.0 INTRODUCTION   
2.1   This report provides members with an update on the works being carried out at the
former White Hart Hotel, Campbeltown in response to the Dangerous Buildings
Notice served by the Councils Building Standards on the property owner on the 9 May
2023. 
2.2 The property owner is carrying work to the property to address the issues detailed in
the Dangerous Buildings Notice, as well as other general maintenance works. They
continue to cooperate with building standard who are monitoring this situation to
ensure that the formal Notice is complied with. Meantime, public safety is protected
by the repair works carried out to date and the heras fencing. 
3.0 RECOMMENDATIONS 
3.1        Members are asked to consider and note the progress being made to improve the                       
condition of the White Hart Hotel. 
4.0 CURRENT POSITION   
4.1 The property owner is cooperating with the Councils Building Standards and has
instructed works to address the issues detailed in the Dangerous Buildings Notice,
as well as other general repairs. This work is ongoing and is being monitored by
building standards. Regular updates are being provided to local members. 
4.2 Public safety is protected meantime by the actions taken by building standards in
May 2023, to erect heras fencing on the pavement area immediately in front of the
property and through the works undertaken by the owner. The Dangerous Buildings
Notice remains in place until all works on the Notice are complete to the satisfaction
of a structural engineer and building standards. 
4.3 A property visit on the 21 August by building standards noted that works were
ongoing and the owner is undertaking general maintenance work, in addition to
the works specified in the Dangerous Buildings Notice.  Photographs are
attached to this report which indicate the progress being made and some key
works to note are: 
a. Scaffold has been erected on Argyll Street to enable the replacement and
refurbishment of the sash and case windows on that elevation. As part of

Page 3

the works, the internal timber safe lintels are intermediate floor joists will
be checked, and replaced where necessary. 
b. Roof repairs will be carried out when the scaffolding is in place
c. Defective boss render to the rear external wall has been removed. The
lowering and capping of the boundary walls at Barochan Place and
Flemings Land is currently paused due to a telecom cable issue, which is
the subject of legal advice on the part of the White Hart Hotels owner and
the owner advises that there are discussions with a Barochan Place
representative in regards to a mutually agreed course of action.
d. Works to the ceiling ties and rafters are ongoing but yet complete.
e. Replacement of the timber safe lintels is well underway and nearing
completion
f. Masonry repairs are ongoing and not yet complete. 
5.0 FUTURE ACTIONS   
5.1 The owner is currently carrying out works to comply with the formal notice, in
addition to other general repairs. 
5.2 Building Standards will continue to liaise with the owner and monitor the situation
to ensure that the Dangerous Buildings Notice is fully complied with and that
there are no imminent risks to public safety. 
5.3 The Dangerous Buildings Notice and heras fencing will remain in place until a
structural engineer confirms that the works are complete and that building
standards are satisfied that the building no longer poses an imminent risk to
public safety. At that point, building standard will not have any direct remit to
oversee the other general repairs. 
5.4 Building Standards will continue to update local elected members on the situation
of any developments.
6.0 CONCLUSIONS   
6.1 The actions taken by Building Standards protected public safety and were undertaken
very quickly and effectively. The property owner has instructed repair works which
are ongoing, designed to comply with the Dangerous Buildings Notice and to improve
the general condition of the property. 
7.0 IMPLICATIONS   
7.1 Policy Consistent with Council priorities 
7.2 Financial Costs incurred by the Council in responding to this dangerous building
will be recovered from the owner. There are no ongoing costs other than
resources to monitor the situation. 
7.3 Legal Effective use of powers under the Building (Scotland) Act 2003 
7.4 HR None. 
7.5 Fairer Scotland 
7.5.1 Equalities There are no equality or sustainability issues associated with the plan

Page 4

7.5.2 Socio-
economic 
7.5.3 Islands There are no island implications. 
7.6 Climate
Change
There are no climate change implications. 
7.7 Risk Public safety risks have been minimised thorough the actions by
Building Standards
Risk that Council may require to undertake works in default, if the owner
fails to meet their commitment to carry out any specified urgent works. 
7.8 Customer 
Service
No significant issues. 
Executive Director with responsibility for Development and Economic Growth: 
Kirsty Flanagan 
Policy Lead for Planning and Regulatory Services: Councillor Kieron Green 
For further information contact:  
Alan Morrison, Regulatory Services and Building Standards Manager/Tony Casci, Principal Team
Lead, Building Standards.  Email buildingstandards.maki@argyll-bute.gov.uk 
Appendix I: Photographs of the White Hart Hotel, Campbeltown 21 August 2023