Democracy Spraffa

Supplementary Pack 1

Argyll and Bute Council · 30 October 2024
Back to Short Life Working Group on Argyll and Bute Council Visitor Levy — 30 October 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
25 October 2024 
SUPPLEMENTARY PACK 1 
SHORT LIFE WORKING GROUP ON ARGYLL AND BUTE COUNCIL VISITOR LEVY - BY
MICROSOFT TEAMS on WEDNESDAY, 30 OCTOBER 2024 at 2:00 PM 
I enclose herewith item 4 (ARGYLL AND BUTE COUNCIL VISITOR LEVY) which was marked to
follow on the Agenda for the above meeting. 
Douglas Hendry
Executive Director 
ITEM TO FOLLOW 
4. ARGYLL AND BUTE COUNCIL VISITOR LEVY (Pages 3 - 20)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Short Life Working Group on Argyll and Bute Council Visitor Levy 
Councillor Anne Horn Councillor Jim Lynch (Chair)
Councillor Julie McKenzie Councillor Ross Moreland (Vice-Chair)
Councillor Gary Mulvaney Councillor Peter Wallace 
Kirsty Flanagan Douglas Hendry
Pippa Milne 
Contact: Hazel MacInnes, Senior Committee Officer  Tel:01546 604269
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

ARGYLL AND BUTE COUNCIL  VISITOR LEVY SHORT LIFE WORKING
GROUP 
DEVELOPMENT & ECONOMIC GROWTH  30th OCTOBER 2024 
UPDATE: ARGYLL AND BUTE COUNCIL VISITOR LEVY 
1.0 INTRODUCTION 
1.1 The purpose of this paper is to provide members of the Visitor Levy (VL) Short
Life Working Group (SLWG) will an update on and gain their input to the
preparatory work for the draft Argyll and Bute Council VL Scheme. 
1.2 Further to the VL SLWG meeting on 1st October, the formal VL Guidance for
local authorities was published in the public domain on 4th October 2024. With
reference to the guidance document, detail statutory and non-statutory activity
already undertaken by elected members, council officers and members of the
Shadow VL Forum, complete with a revised timescale of ongoing preparatory
consultation and engagement work, is outlined in Table 1 in the report. 
1.3 With regard to the pre-consultation preparatory work, particular consideration is
required on the timing of the draft Argyll and Bute Council VL Scheme and
associated papers for the full council meeting on 21st November. In order to
conclude the pre-consultation activity and use the feedback to shape the draft
VL Scheme as appropriate, a separate Special Council meeting is sought in
December 2024 where the meeting will solely focus on the Argyll and Bute
Council VL Scheme. 
1.4 The latest draft Argyll and Bute Council VL Scheme is outlined in Appendix 1
of this report, complete with the initial impact assessment work contained in
Appendix 2. The activity to date to shape these current draft documents is
outlined in the report, with reference to Table 1. 
2.0 RECOMMENDATIONS 
2.1 Members are asked to:
• Note and consider the content of this paper.
• Consider and comment on the activity and timescales noted in Table 1 of
this report. 
• Endorse the requirement for a short paper to go to the full Argyll and Bute
Council meeting on 21st November 2024 to seek more time to conclude the
pre-consultation activity and preparatory work, with the draft Argyll and Bute
Council VL Scheme and associated papers being considered at a Special
Council meeting in December 2024 (date to be confirmed).
• Consider and comment on the latest draft Argyll and Bute Council VL
Scheme and initial impact assessment work outlined in Appendices 1 and
2.
Page 3 Agenda Item 4

Page 4

3.0 DETAIL 
3.1  The main focus of this report is to advise the VL SLWG members of and seek
their input on the preparatory activity that has taken place since the meeting on
the 1st October 2024. For ease of reference this has been depicted in Table 1 of
this report. This is an updated version of the Table 1 outlined in the Special
Council paper on 15th August 2024. 
3.2 Given that the formal VL Guidance has been published, one material change is
that the formal consultation period has been amended to the 12-week
recommended timescale. It is important to align to the key requirements within the
VL Guidance, particularly those noted as statutory, to avoid the possibility of
having to restart the 18-month implementation period. 
3.3 As noted in Table 1, the pre-consultation survey will close on Monday, 28th
October. At the time of writing this report 1,064 responses had been received. It is
hoped that an initial summary of the responses can be reported verbally to the VL
SLWG on the 30th October to assist in how, within statutory boundaries, these
responses will help to shape the draft Argyll and Bute Council VL Scheme that will
be issued for formal consultation by the end of this calendar year. 
3.4 The feedback from the six VL stakeholder consultation sessions organised by
members of the Shadow VL Forum (Argyll and the Isles Tourism Co-operative
and VisitScotland) on 23rd and 30th (x2) October and 6th. 7th and 14th November
2024 will be provided at the next VL SLWG meeting in the latter part of
November (date to be confirmed). 
3.5 Argyll and Bute Council officers are working with professors from the University
of Edinburgh Business School to look at forecasting the potential level of Visitor
Levy income using a working rate figure of 5%. They worked with the City of
Edinburgh Council on their forecasts. The data available regarding
accommodation providers, their bed spaces and occupation rates is limited but
officers are confident robust estimates will be ready for the proposed Special
Argyll and Bute Council meeting in December 2024. 
3.6 The exact mechanism for billing and collecting the levy is still under discussion,
including the development of a national platform through discussions with the
Improvement Service. More details will be provided in due course. Argyll and
Bute Council will ensure compliance, with penalties and debt recovery
processes in place for non-compliance. Establishing a robust internal team for
project management, enforcement, and data analysis will be necessary to
support the implementation of the VL and any supporting systems. 
Page 4

Page 5

3.7 Table 1 below outlines an indicative timeline of activities for the establishing and implementing of a visitor levy including key
council meetings. The text in italics mirrors that in the VL Guidance document and statutory requirements are highlighted in
light blue. 
Table 1: Indicative Timeline of Activities to Establish a Visitor Levy (VL) aligned to the final VL Guidance Document
Indicative
Timeline
Activity Statutory
Requirement
Pre-consultation work
Ongoing Local authorities undertake work to understand their local visitor accommodation sector and set up necessary
cross working between local authority departments. 
VL Officers’ Working Group (OWG) established on 2nd July 2024 and meets fortnightly. Members of the VL OWG are
from key council functions, such as Economic Growth, Revenue and Benefits, Communication and Customer Services.
Argyll and Bute Council officers are working with professors from the University of Edinburgh Business School to look
at forecasting the potential level of VL income using a working levy rate of 5%. 
Ongoing Local authorities engage with stakeholders to develop visitor levy proposal. 
Shadow VL Forum is established: inaugural meeting on 7th October and a workshop session on 24th October. The next
meeting is scheduled for 14th (p.m.) November 2024
Members of the Shadow VL Forum (AITC and VS) have set up six VL stakeholder consultation sessions on 23rd and
30th (x2) October and 6th. 7th and 14th (a.m.) November 2024 which will be attended by officers from the OWG.
Pre-consultation survey issued on 11th October and closes on 28th October 2024. 
Ongoing Discussion and debate at relevant local authority committees. 
VL SLWG (public meeting) established and chaired by the Council Leader. VL SLWG comprises of four members of the
Administration and two members from the Opposition. First meeting, 1st Oct and the next scheduled for 30th October.
Elected Members Seminar on the VL, attended by industry reps/Shadow Forum members from AITC and VS on 16th
October. VL paper approved at a Special Council meeting on 15th August 2024. 
Ongoing Local authorities to prepare for consultation.
Argyll and Bute Council web page went live on 9th October, https://www.argyll-bute.gov.uk/my-community/recreation-
and-leisure/argyll-and-bute-visitor-levy complete with an inbox Abvl@argyll-bute.gov.uk for questions and a link to
FAQs. An internal ChatBot is being developed to assist in fielding FAQs. 
Oct 2024 Objectives of VL Scheme to be developed. 
Aligned with the four strategic objectives/priorities within the Argyll and the Isles Strategic Tourism Partnership
Strategy. The objectives have been tweaked slightly at the Shadow VL Forum meeting on 24th October to mirror the
work already underway by the AISTP (five of which are Shadow VL Forum members) to prepare a revised strategy,
spring 2025.
√
Oct/Nov
2024
Impact studies to be carried out as required. 
Initial draft impact studies are outlined for consideration in Appendix 2 of this VL SLWG paper, 30th October 2024.
√
Page 5

Page 6

Table 1: Indicative Timeline of Visitor Levy (VL) Implementation Requirements (continued)
Indicative
Timeline
Activity Statutory
Requirement
Nov 2024 Develop draft VL Scheme to be proposed. 
Preparation of the draft Argyll and Bute Council VL Scheme is ongoing with key input from the VL SLWG and will be
informed by the results from the pre-consultation survey and VL stakeholder session discussions. A final draft will be
included in the paper pack for a proposed Special Argyll and Bute Council meeting in December 2024. 
Nov 2024 Plans for use of net proceeds of the VL Scheme to be developed.
Feedback sought in the pre-consultation survey and from the workshop session with the Shadow VL Forum (initial
summary included in the draft VL Scheme document in Appendix 1 of this paper. Input and discussions at the VL
SLWG for what is included in the draft Argyll and Bute Council VL Scheme. 
Dec 2024 Agreement of draft VL Scheme by the local authority.
Draft Argyll and Bute Council VL Scheme, and all supporting documentation, to be considered at a proposed Special
Argyll and Bute Council meeting in December 2024. 
Formal Consultation
Late Dec
2024 –
mid Mar
2025
Public consultation on entire draft Argyll and Bute Council VL Scheme proposal (standard practice is 12
weeks)
Timescale aligned to approval of draft Argyll and Bute Council VL Scheme and associated documents at a proposed
Special Argyll and Bute Council meeting in December 2024.
√
Mar/Apr
2025
Analyse and report findings on the local authority committee, including potential changes to the Argyll and
Bute Council draft VL Scheme in light of the consultation.
VL OWG analyse findings working with the VL SLWG and input from the Shadow VL Forum, as appropriate. 
Governance Requirements
Apr/May
2025
Formal public announcement of decision to introduce a visitor levy or not (include start date in late 2026).
Report to a Special Council meeting in April / May 2025 (dependent on response from the formal consultation to
prepare a final Argyll and Bute Council VL Scheme for approval).
√
May/June
2025
Minimum 18-month implementation report begins.
Official start date for 18-month period to be confirmed nearer the time.
√
May/June
2025
Scottish Ministers to be notified of decision to introduce a visitor levy across Argyll and Bute. √
May/June
2025
Establish a Visitor Levy Forum within six months of formal public announcement of a decision to introduce a
VL Scheme.
Augment current Shadow VL Forum to establish a the main VL Forum (advisory function) to be maintained for the
duration of the scheme (meet at least two times per calendar year).
√
Mid-June
2025
Argyll and Bute Council to advise businesses of their liability and prepared administration of Argyll and Bute
Council VL Scheme. 
Page 6

Page 7

Table 1: Indicative Timeline of Visitor Levy (VL) Implementation Requirements (continued)
Indicative
Timeline
Activity Statutory
Requirement
Governance Requirements
Mid-Dec
2026
Implementation period expires.  
Late Dec
2026
The Argyll and Bute Council VL Scheme comes into force, and the VL is collected and remitted to Argyll and
Bute Council.
√
Dec 2027 Annual report on the Argyll and Bute Council VL Scheme 
An annual report will go to a full Argyll and Bute Council meeting, where the paper will be in the public domain.
√
Source: VL Guidance and Officer Commentary 
Page 7

Page 8

Feedback from the Shadow VL Forum Workshop Session 
3.8 At the Shadow VL Forum workshop on 24th October, the strategic priorities
within the Argyll and the Isles Strategic Tourism Partnership (AISTP) Visitor
Economy Recovery and Growth Strategy were revisited and one tweaked
slightly to mirror the work already underway by the AISTP (five AISTP members
are Shadow VL Forum members). The third objective is now about “sustaining
and improving the offer”. This is depicted in the latest draft Argyll and Bute
Council Visitor Levy Scheme in Appendix 1. 
3.9 Work was undertaken to provide some initial broad year-on-year (short to
longer term) investment opportunities that could be supported by the net visitor
levy proceeds under each of the strategic priorities (see Appendix 1). Such
funds could have the potential to lever in additional public, private and/or third
sector investment funding. However, this work needs to be informed by the
responses from the pre-consultation survey which asked about suggested uses
of the funds generated by the visitor levy and from the VL stakeholder sessions
currently underway. In addition, the consultation responses may be able to
categorise investment opportunities into those appropriate for capital and
revenue expenditure. 
4.0 CONCLUSION 
4.1  The purpose of this paper is to provide members of the Visitor Levy (VL) Short
Life Working Group (SLWG) will an update on and gain their input to the
preparatory work for the draft Argyll and Bute Council Visitor Levy Scheme. 
5.0 IMPLICATIONS 
5.1  Policy: the visitor levy has become law following Royal Assent of the Visitor
Levy (Scotland) Bill and the VL Guidance has been published. 
5.2  Financial: as an early adopter, the council may be required to make an initial
contribution to the build costs for the proposed national digital platform (if this is
the preferred approach) which will be recouped. The implementation of the levy
could generate a substantial yearly income for Argyll and Bute Council subject
to scrutiny from the Visitor Levy Forum. At present the University of Edinburgh
is undertaking detailed forecasting work on the income to be accrued based on
a 5% levy (working figure) using the Scottish Tourism Economic Activity
Monitor (STEAM) data. 
5.3  Legal: all appropriate legal implications will be taken into consideration. 
5.4  HR: the VL SLWG is supported by officers from the VL OWG and members of
the Shadow VL Forum. 
5.5  Fairer Scotland Duty: the Fairer Scotland Duty, Part 1 of the Equality Act 2010,
came into force in April 2018. The duty places a legal responsibility on
particular public bodies in Scotland, such as Argyll and Bute Council, to pay
due regard to (actively consider) how they can reduce inequalities of outcome,
Page 8

Page 9

caused by socio-economic disadvantage, when making strategic decisions and
how this has been implemented. 
5.5.1 Equalities: none. 
5.5.2 Socio-economic Duty: none.
5.5.3 Islands: the same visitor levy scheme, with the same percentage rate charged
for overnight accommodation, will cover the whole of Argyll and Bute, including
accommodation providers on the islands. It is anticipated that this nominal rate
will not disproportionately impact island accommodation providers any more
than those based on the mainland throughout the region. 
5.6  Climate Change: none. 
5.7  Risk: there is a risk that the Argyll and Bute Council does not implement the
visitor levy process in adherence to the Scottish Government timelines which
could delay implementation. 
5.8  Customer Service: there is a need to implement an efficient visitor levy process
that is transparent and easy to use by our customers.   
5.9 The Rights of the Child (UNCRC): none. 
Kirsty Flanagan, Executive Director responsible for Economic Growth 
Councillor Jim Lynch, Leader of Argyll and Bute Council 
25th October 2024 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth
fergus.murray@argyll-bute.gov.uk 
Ishabel Bremner, Economic Growth Manager 
ishabel.bremner@argyll-bute.gov.uk 
APPENDICES 
Appendix 1: Draft Argyll and Bute VL Scheme.
Appendix 2: Draft Impact Assessment: Argyll and Bute Council Visitor Levy Scheme 
Page 9

Page 10

Appendix 1: Draft Argyll and Bute Council VL Scheme 
Draft Argyll and Bute Council VL Scheme 
Argyll and Bute Council intends to utilise the powers granted by the Visitor Levy
(Scotland) Act 2024 to impose a levy in respect of persons staying in certain types of
accommodation overnight in its local authority area. 
1. Levy start date 
The scheme will come into force 18 months after the final approval date in which
Argyll and Bute Council publishes its final scheme. This report will summarise
the consultation responses received and will state that it intends to proceed with
the original or modified proposal. 
2. Levy duration 
The levy will apply indefinitely. As note in the Visitor Levy (Scotland) Act, Argyll
and Bute Council is required to review its VL Scheme after a set period, see
Section 8 below. 
3. Accommodation liable for the levy 
The levy will apply to all chargeable overnight accommodation within Argyll and
Bute Council boundary. This includes:
• Hotels;
• Hostels;
• Guest houses;
• Bed and breakfast accommodation;
• Self-catering accommodation, including short-term lets;
• Camping sites;
• Caravan parks;
• Accommodation in a vehicle, or on board a vessel, which is permanently or 
predominantly situated in one place; and
• Any other place at which a room or area is offered by the occupier for 
residential purposes otherwise than as a visitor’s only or usual place of 
residence. 
4. The levy rate 
As present a 5% levy (working figure) is proposed and will apply year-round,
raising an estimated £9m in gross revenue (this figure is an indicative range
and does not take into account the effect of statutory exemptions, caps
and exclusions). The levy rate will be the same across the entire local authority
area. 
At present the University of Edinburgh is undertaking detailed forecasting work
on the income to be accrued based on a 5% levy (working figure) and on
Scottish Tourism Economic Activity Monitor (STEAM) data for Argyll and Bute. A
verbal update on this work can be provided at the VL SLWG on 30th October.
Page 10

Page 11

5. Collecting and enforcing the levy 
Accommodation providers within the local authority area will be liable for the
levy. They will be required to submit quarterly reports (could be monthly – still to
be determined) detailing the total accommodation charges and the total levy
collected to a national and/or local online visitor levy portal. 
The levy will be payable at the same time as submitting returns. (There is the
potential to mirror the submitting timelines under current scheme such as VAT
returns or short term lets). 
Accommodation providers are required to keep accurate records of all
transactions that are subject to the levy. The council will conduct inspections, as
required, to ensure compliance with the scheme and remittance requirements
(more information to be provided). 
Accommodation providers who fail to comply will be subject to penalties. 
Appeals relating to decisions made by the council on the operation and/or
enforcement of the scheme can be registered via an online portal or email
address. The council will aim to review and process these appeals within 28
days. 
6. Exemptions, exclusions and caps 
The key focus for the administration of the Argyll and Bute Council Visitor Levy
Scheme is to keep it simple. It is recommended by officers that only the
exemptions and exclusions noted in the Act are included, as noted below. 
Please note, a question on the potential to cap the levy to a certain number of
nights has been included in the pre-consultation questions. 
Act exemptions and exclusions 
The Visitor Levy is payable by anyone staying in accommodation which is not
their only or usual place of residence (temporary or otherwise). Individuals from
the below categories are not required to pay the levy:
• Those who are homeless or at risk of homelessness. This includes those
who are currently homeless or at risk of losing their home in the next eight
weeks. This also includes people living in very poor housing conditions, such
as overcrowding, serious damp, or disrepair, or as a result of experiencing
domestic abuse or other forms of violence;
• Those whose residence is unfit for habitation;
• Asylum seekers and refugees; and
• Members of the Gypsy/Traveller communities staying on dedicated sites. 
In addition, Section 13 of the Visitor Levy (Scotland) Act exempts all individuals
in receipt of the following UK disability benefits, payments, or allowances from
paying the levy: 
• Disability Living Allowance 
Page 11

Page 12

• Disability Assistance 
• Attendance Allowance 
• Pension Age Disability Benefit 
• Personal Independence Payment. 
The cost of separate charged add-ons are not part of a levy, such as:
• food
• drink
• parking
• entertainment
• leisure passes. 
Potential Argyll and Bute Council processes 
Individuals in the exemption categories may need to pay the levy and request
reimbursement from Argyll and Bute Council. Reimbursement can be applied for
online, submitting receipts for their overnight stay, relevant evidence (as will be
detailed on the council’s website) of their exemption/exclusion and bank details. 
For those in receipt of the UK disability benefits, payments or allowances
detailed above, evidence will be required to be submitted online and should
include:
• The name of person in receipt of relevant eligible benefit;
• Alignment to the agreed Argyll and Bute Council VL Scheme;
• A copy (scan/photo) of relevant benefit award letter;
• The name of the person in receipt of the relevant benefit should be included
on the receipt or booking; 
• Proof of payment for overnight accommodation; and
• Bank details (to enable payment via BACS). 
The council will assess the evidence received and pay the reimbursement via
bank transfer if the applicant is found to be eligible. 
It should be noted that Argyll and Bute Council officers are still working on
the exact processes that will need to be put in place and will require
political approval in due course. 
7. Scheme Strategic Objectives/Priorities and the Use of Funds 
The overarching aim of the VL Scheme is: 
To sustain Argyll and Bute's status as an area of outstanding natural beauty and
heritage and to ensure that the impacts of a successful visitor economy are
managed effectively and in support of the Argyll and Bute Council’s priorities and
those highlighted in the Argyll and the Isles Strategic Tourism Partnership’s
Tourism Strategy 2022-2025 (Argyll and Isles Strategic Tourism Partnership
strategy). 
The VL Scheme objectives/priorities are aligned to the tweaked strategic
Page 12

Page 13

priorities for the refreshed AISTP Tourism Strategy from 2025 onwards (as per
paragraph 3.8 in the above report) as follows: 
1. Extending the season and spreading visitors across the destination.
2. Reaching new audiences: marine and coastal tourism.
3. Sustaining and improving the offer.
4. The journey towards net zero. 
The Visitor Levy (Scotland) Act requires a local authority operating a VL Scheme
to use the net proceeds of a scheme for certain specific purposes. Those
purposes are that the funds must facilitate the achievement of the schemes
objectives and that they should develop, support and sustain facilities and
services for or used by visitors to a local authority area for leisure or business
purposes. 
As per paragraph 3.9 in the above report the initial broad headings for
investment opportunities enabled by the net levy proceeds are detailed in the
table below, noting that these will need to be informed by the current pre-
consultation consultation and engagement activities currently underway. 
Proposed Investment Opportunities – Short to Longer Term
Strategic
priorities
Extending the
Season and
spreading
visitors across
the destination
Reaching new
audiences:
marine and
coastal tourism
Sustaining and
improving the
offer
The journey
towards net
zero
Overarching
focus
Flexible regional
marketing
activity to
promote hero
products where
there is ambition
and capacity.
Flexible sector-
led marketing
and product
development to
attract key
international and
cultural visitors.
Continuous
investment in
the development
of destinations,
places, people
and visitors
experience.
Investing in and
encouraging
businesses and
visitors to enjoy
the destination
in more
sustainable
ways.
Related activity Sustaining
existing and
creating new
infrastructure
and event
spaces.
Improving step
ashore facilities. 
Inter-island and
destination
connectivity.
Realistic
transport
options. 
Business
development:
• digital
capability
• training and
skills
(employer
and
employee)
• new product
development.
Supporting
businesses with
adopting net
zero practices to
drive
efficiencies. 
Deliver transport
infrastructure
(including active
travel) and
services that
support
transition to low
carbon journeys
for visitors,
business staff
and residents. 
Argyll and Bute Council will make the final decisions on the use of funds taking
into consideration the findings from all pre-consultation activity and the main 12-
week consultation.
Page 13

Page 14

8. Annual reporting, reviewing and changing the VL scheme 
Annual Report 
Within the first 18 months from when the Argyll and Bute Council VL Scheme
comes into force, and for each 12-month period following this, Argyll and Bute
Council must prepare an annual report setting out:
• The amount of money collected
• How the net proceeds have been used; and
• The performance of the VL Scheme in relation to its objectives. 
Formal VL Scheme Review 
The first review must be carried out within three years of a VL Scheme coming
into force. Second and subsequent reviews must be carried out within three
years of the previous reviews. These reviews will assess whether the scheme is
successfully achieving its objectives and measure the impact of the scheme on
businesses and communities. The review will be reported, along with detail on
how the income has been spent and the benefits which the VL-funded projects
have brought. 
VL Scheme Changes 
If the council wants to make changes to the scheme following the review, it will
publicly consult on the change and publish a report detailing the decision and its
justification. Significant changes to the Argyll and Bute Council VL Scheme will
require an 18-month implementation period. Significant changes to the scheme
include:
• increasing the VL percentage rate; and/or
• removing any exemptions. 
9. Visitor Levy Forum (VL Forum) 
Further to the establishment of the initial VL Shadow Forum, small advisory
group at the pre-consultation stage, a VL Forum will be set up by the council
within six months of the Argyll and Bute Council formal announcement that a VL
will be introduced (post the 12-week consultation period). The VL Forum will act
as an advisory board to discuss and advise on the VL scheme, including any
proposed modifications. The VL Forum will also be consulted on how the VL
funds will be spent. 
The VL Forum will be made up of representatives from the community and from 
businesses in the visitor economy. 
It should be noted that the VL Forum has no capacity to make any decisions. All
decisions can only be made by Argyll and Bute Council elected members.  
Page 14

Page 15

Appendix 2: Draft Impact Assessment: Argyll and Bute Council VL Scheme 
Overview 
This impact assessment evaluates the potential consequences of Argyll and Bute
Council’s draft VL Scheme as outlined in the VL (Scotland) Act 2024. The levy will
apply to overnight accommodation across various categories in the region and is
designed to generate revenue for sustainable tourism development while addressing
community needs. This assessment covers the impacts on key stakeholders,
including businesses collecting and remitting the levy, visitors paying the levy, local
communities, including island communities, the local authority administering the
scheme and an overarching equalities impact assessment. 
A. Impact on Businesses Collecting and Remitting the Levy 
1. Administrative Burden:
• Accommodation providers will be required to collect a 5% levy (working
figure at present) and submit quarterly returns via a national online portal
(all to be confirmed). This introduces an additional administrative
burden, particularly for small businesses that may not have the
resources to handle such tasks efficiently. 
• Record-keeping requirements and potential inspections will increase
operational complexity, especially for providers unfamiliar with such
regulatory obligations. 
2. Financial Impacts:
• Businesses with low profit margins may experience challenges
incorporating the levy collection process without passing costs onto
consumers. Some operators may need to invest in updated software or
processes to handle reporting and compliance. 
• Non-compliance penalties could pose a financial risk to smaller
providers, especially if the required training or systems for levy collection
are unclear. 
• The HMRC position is that the levy collection is treated as income for
VAT purposes. Requiring small businesses to collect and remit the
visitor levy may inadvertently push those close to the VAT threshold over
the limit, thereby triggering mandatory VAT registration and the
associated administrative and financial burdens. This added obligation
could increase operational complexity for small businesses, which may
face higher administrative costs and potential price increases that impact
competitiveness in price-sensitive sectors. The lack of specific reliefs or
exemptions for businesses affected in this way may exacerbate these
challenges, underscoring the need for careful policy consideration to
mitigate unintended impacts on small enterprises. It is proposed by
industry representatives on the Shadow VL Forum that industry
Page 15

Page 16

liaises with the Scottish Tourism Alliance to lobby the HMRC on
their behalf on this issue. 
3. Economic Effect:
• The levy may lead to higher accommodation prices, potentially affecting
demand, particularly among cost-sensitive customers. This could have
knock-on effects on occupancy rates, especially during off-peak
seasons. 
• However, businesses located in less-visited areas may benefit from the
levy’s objective to spread visitor traffic across the region, potentially
increasing bookings in those areas. 
• A number of tourism businesses may decide to close their operation
prior to the introduction of the levy reducing capacity across Argyll and
Bute. 
B. Impact on Visitors Paying the Levy 
1. Visitor Perception:
• Visitors may view the levy as an additional cost, potentially influencing
their decision to stay in Argyll and Bute compared to other regions
without such levies. This could especially deter budget-conscious
travellers or those staying for longer periods. 
• Transparency together with clear communication concerning the levy’s
purpose and the tangible benefits it will bring to the visitor experience,
such as improved infrastructure and environmental initiatives, will be
crucial in mitigating any negative perception. 
2. Visitor Demographics:
• High-end and eco-conscious tourists may be more accepting of the levy,
as it aligns with responsible and sustainable tourism goals. Conversely,
visitors relying on budget accommodation (e.g., campers, hostels) may
feel a disproportionate impact, as the percentage-based levy could result
in significant additional costs over longer stays. 
3. Visitor Experience:
• The revenue generated will be used to enhance the visitor experience
through improved infrastructure (e.g. campervan pitches, public toilets,
signage) culture and heritage including events, which may help justify
the additional cost (see section 7 of the VL Scheme for more details). If
visitors perceive these enhancements positively, the levy may have a
neutral or even positive long-term impact on visitor satisfaction. 
C. Impact on Communities who may Benefit from the Levy 
1. Economic and Social Benefits:
• Local communities are likely to see benefits from the levy, including
funding for infrastructure improvements, public realm upgrades, and
Page 16

Page 17

enhanced cultural and recreational facilities (see section 7 of the VL
Scheme for more details). These investments will support both the visitor
economy and residents' quality of life, contributing to local job creation
and enhanced services. 
• Extending the tourism season and promoting less-visited areas can
spread economic benefits more evenly across the region, reducing
pressure on popular spots and allowing smaller communities to tap into
the tourism economy. 
2. Environmental and Cultural Preservation:
• The focus on environmental sustainability and supporting initiatives like
net-zero projects and responsible tourism will help protect Argyll and
Bute’s natural and cultural heritage. Local communities, particularly in
rural and coastal areas, will benefit from initiatives to manage visitor
impacts, such as improved waste management and protection of fragile
ecosystems. 
3. Community Involvement:
• The establishment of the Shadow and then main Visitor Levy Forum,
which includes (and will include) representatives from local businesses
and communities, provides an avenue for stakeholders to voice their
concerns and influence how funds are allocated. This participatory
approach can foster community buy-in and help ensure that projects
funded by the levy address both visitor and local resident needs. 
D. Impact on Local Authorities Administering the Levy 
1. Administrative Burden:
• Argyll and Bute Council will face new responsibilities in terms of
managing the levy, including processing returns, conducting compliance
inspections, managing appeals, and distributing funds. These tasks will
require dedicated resources and staff training. 
• The council will also need to ensure that the national online portal (if this
option is taken forward) operates smoothly and provides clear
instructions and training workshops/webinars for accommodation
providers. Any technical issues or miscommunications could result in
compliance problems and reduce the effectiveness of the scheme. 
2. Revenue Generation:
• The council expects to raise circa £9 million in gross revenue annually,
which will be used to fund a wide range of local projects related to
tourism infrastructure, culture and heritage, environmental sustainability,
and community support (see section 7 of the VL Scheme for more
details). This new revenue stream will reduce the financial strain on
existing council budgets and enable longer-term investments in the
region’s tourism sector. 
Page 17

Page 18

• Argyll and Bute Council will need to carefully manage the costs of
administering the scheme to ensure that net revenue is maximised.
Monitoring compliance, managing appeals, and processing
reimbursements for exempt individuals will add to the overall complexity
and cost of administering the scheme. 
3. Policy Review and Adaptation:
• The council will review the scheme every three years, assessing its
success in meeting objectives and making adjustments as necessary.
This ensures that the levy remains responsive to changing conditions in
the tourism sector and local economy. However, regular reviews may
require additional administrative resources and consultation processes. 
E. Impact on Island Communities 
1. Economic Sustainability and Visitor Distribution:
• Island communities within Argyll and Bute may experience unique
economic challenges and benefits from the levy. While the additional
revenue has the potential to enhance local infrastructure, support
services, and sustainable tourism initiatives, there is also a risk that the
levy may impact visitor numbers to these areas, particularly for cost-
sensitive travellers. If visitor demand decreases, smaller island
businesses could face a disproportionate economic impact compared to
mainland operators. Strategic reinvestment of levy funds to support
island-specific tourism and transport infrastructure will be essential to
ensuring that these communities benefit from increased visitation rather
than reduced demand. 
2. Increased Costs and Infrastructure Strain:
• Due to their limited resources and higher operational costs, island
businesses may face greater challenges in meeting levy collection
requirements. Transporting supplies and addressing waste management
are often costlier for island communities, so visitor levies should ideally
support these unique needs, addressing infrastructure and services that
directly impact both residents and visitors. This could include enhanced
ferry services, improved access to emergency services, waste
management solutions, and upgrades to basic visitor facilities, which are
critical to sustaining both the tourism industry and local quality of life. 
3. Cultural and Environmental Preservation:
• Island communities are home to sensitive ecosystems and cultural
heritage sites that are highly vulnerable to the pressures of tourism. The
levy offers an opportunity to direct resources towards the preservation of
these assets, such as coastal ecosystems, local wildlife, historic sites,
and island-specific cultural practices. Prioritising projects that protect the
environmental integrity and cultural heritage of these communities will
foster sustainable tourism while safeguarding local traditions and the
natural landscape for future generations. 
Page 18

Page 19

4. Community Engagement and Fair Distribution of Fund:
• Engaging island residents for consideration as members of the Visitor
Levy Forum and ensuring equitable fund allocation to island projects are
essential for maintaining community support and maximising the levy’s
positive impact on these areas. Establishing specific channels for island
representatives to influence decision-making will help align the levy’s
revenue usage with the unique needs and priorities of these
communities, fostering greater community buy-in and promoting projects
that reflect both visitor and resident interest. 
F. Equalities Impact Assessment – this is currently being prepared and will be
shared in due course. 
Conclusion 
The VL Scheme for Argyll and Bute has the potential to generate significant benefits
for the local economy, community aspirations, culture and heritage, and tourism
infrastructure while promoting sustainable tourism practices. However, the VL
Scheme introduces new administrative burdens for both businesses and the council,
with particular challenges for island communities that face unique economic and
infrastructure constraints. Effective communication, transparent, user-friendly
systems, and a clear demonstration of how the levy benefits both visitors and
residents will be crucial in ensuring the scheme’s success. Ensuring the fair
allocation of funds to address the distinct needs of island communities, alongside
proactive monitoring and adjustments to the scheme, will be essential to mitigate any
negative impacts on tourism businesses, communities, and visitor experiences
throughout the region. 
Page 19

Page 20

This page is intentionally left blank