Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 16 June 2022
Back to Policy and Resources Committee — 16 June 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
9 June 2022 
NOTICE OF MEETING 
A meeting of the POLICY AND RESOURCES COMMITTEE will be held in the COUNCIL
CHAMBER, KILMORY, LOCHGILPHEAD AND ON A HYBRID MEETING BASIS BY MS TEAMS
ATTENDANCE on THURSDAY, 16 JUNE 2022 at 10:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES (Pages 3 - 10)  
Policy and Resources Committee held on 17 February 2022 
4. BUDGET OUTLOOK 2023-24 TO 2027-28 (Pages 11 - 32)  
Report by Section 95 Officer 
5. KEY PERFORMANCE INDICATORS FQ4 2021/22 (Pages 33 - 60)  
Report by Executive Directors with responsibility for Financial Services, Commercial
Services, Legal and Regulatory Support and Customer Services Support 
6. PLACE BASED INVESTMENT AND CROWN ESTATE FUND 2022/23 - PROJECTS
AND ALLOCATION (Pages 61 - 70)  
Report by Executive Director with responsibility for Development and Economic
Growth 
7. HISTORIC ENVIRONMENT SCOTLAND HERITAGE AND PLACE PROGRAMME -
OPPORTUNITY FOR PLACE BASED HERITAGE FUNDING (Pages 71 - 86)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Public Document Pack

Page 2

8. STRATEGIC EVENTS AND FESTIVALS - ROUND 4.2 - 2022/2023 (Pages 87 - 94)  
Report by Executive Director with responsibility for Development and Economic
Growth 
9. SCOTLAND LOVES LOCAL GIFT CARD UPDATE (Pages 95 - 98)  
Report by Executive Director with responsibility for Development and Economic
Growth 
REPORT FOR NOTING 
10. POLICY AND RESOURCES WORKPLAN (Pages 99 - 100) 
Policy and Resources Committee 
Councillor Gordon Blair Councillor Robin Currie (Chair)
Councillor Audrey Forrest Councillor Kieron Green
Councillor Amanda Hampsey Councillor Fiona Howard
Councillor Willie Hume Councillor Jim Lynch
Councillor Andrew Kain Councillor Reeni Kennedy-Boyle
Councillor John McAlpine Councillor Liz McCabe
Councillor Yvonne McNeilly Councillor Ross Moreland
Councillor Gary Mulvaney (Vice-Chair) Councillor Douglas Philand   
Contact: Sandra Campbell  Tel: 01546 604401

Page 3

MINUTES of MEETING of POLICY AND RESOURCES COMMITTEE held BY MS TEAMS 
on THURSDAY, 17 FEBRUARY 2022 
Present: Councillor Robin Currie (Chair) 
Councillor Rory Colville
Councillor Mary-Jean Devon
Councillor Kieron Green
Councillor Jim Findlay
Councillor Audrey Forrest
Councillor Jim Lynch
Councillor David Kinniburgh 
Councillor Yvonne McNeilly
Councillor Aileen Morton
Councillor Gary Mulvaney
Councillor Douglas Philand
Councillor Alastair Redman
Councillor Elaine Robertson
Councillor Richard Trail 
Attending: Pippa Milne, Chief Executive
Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director
Anne Blue, Interim Head of Financial Services
Fergus Murray, Head of Development and Economic Growth
Patricia O’Neill, Governance Manager 
1. APOLOGIES FOR ABSENCE 
There were no apologies for absence. 
2. DECLARATIONS OF INTEREST 
Councillor Audrey Forrest declared a non-financial interest in item 5 of the agenda
(Budgeting Pack 2022/23) by virtue of her appointment by the Council to the Board of Live
Argyll.  She advised that as this was a council appointment she would remain in the
meeting during consideration of this item of business. 
Councillor Elaine Robertson declared a financial interest in item 12 of the agenda (Other
Funding Streams: Crown Estates, Islands Infrastructure Fund and Place Based
Investment Fund) by virtue of a connection to property on Gibraltar Street, Oban.  She
advised that she would leave the meeting during consideration of this item of business. 
3. MINUTES 
(a) Policy and Resources Committee held on 9 December 2021 
The Minutes of the meeting of the Policy and Resources Committee held on 9
December 2021 were approved as a correct record. 
(b) Special Policy and Resources Committee held on 9 December 2021 
The Minutes of the meeting of the Special Policy and Resources Committee held on
9 December 2021 were approved as a correct record. 
Page 3 Agenda Item 3

Page 4

4. FINANCIAL REPORTS MONITORING PACK - 31 DECEMBER 2021 
The Committee gave consideration to a report providing a summary of the financial
monitoring reports as at the end of December 2021.  There were six detailed reports,
setting out the position as at 31 December 2021. 
Decision 
The Policy and Resources Committee – 
1. Noted the revenue budget monitoring report as at 31 December 2021. 
2. Noted the progress with the policy savings options as at 31 December 2021. 
3. Noted the financial risks for 2021-22. 
4. Noted the capital plan monitoring report as at 31 December 2021 and approved the
proposed changes to the capital plan outlined in Appendix 4 of that report. 
5. Noted the treasury monitoring report as at 31 December 2021. 
6. Noted the reserves and balances report as at 31 December 2021. 
7. Noted there were no revenue virements over £0.200m during November and
December. 
(Reference:  Report by Section 95 Officer dated 10 February 2022, submitted) 
Councillor Jim Findlay joined the meeting at this point. 
* 5. BUDGETING PACK 2022-2023 
The Committee gave consideration to the full package of papers included in the Budget
Pack 2022/23 in relation to the Revenue and Capital Budgets for 2022/23. 
Decision 
The Committee agreed to refer consideration of the Budget Pack 2022/23 to the Council
meeting on 24 February 2022, without recommendation. 
(Reference:  Budgeting Pack 2022/23 dated 17 February 2022, submitted) 
* 6. TREASURY MANAGEMENT STRATEGY STATEMENT AND ANNUAL
INVESTMENT STRATEGY 
The Committee gave consideration to a report which sought approval of the proposed
Treasury Management Strategy Statement and Annual Investment Strategy which set out
the Council’s Strategy for borrowing and investment for the forthcoming year.  The report
also set out the policy for the repayment of loans fund advances for 2022/23. 
Decision 
Page 4

Page 5

The Policy and Resources Committee agreed to recommend to Council at their meeting
on 24 February 2022 to – 
1. Approve the proposed Treasury Management Strategy Statement and Annual Investment
Strategy and the indicators contained within. Note that the figures within the Strategy will be
updated to reflect the budget decisions agreed at Council. 
2. Approve the continued use of the asset life method for the repayment of loan fund advances
using a 5.1% annuity interest rate, with the exception of spend to save schemes where the
funding/income profile method could be used. 
3. Approve the proposed asset repayment periods as detailed within section 2.6 of the Treasury
Management Strategy Statement. 
4. Approve the ability to continue to use countries with a sovereign rating of AA- and above, as
recommended by the Council’s external treasury management advisors. 
(Reference:  Report by Section 95 Officer dated 10 February 2022, submitted) 
7. KEY PERFORMANCE INDICATORS FQ3 2021/22 
The Committee gave consideration to a report presenting the FQ3 2021/22 Key
Performance Indicators for Financial Services, Commercial Services, Legal and
Regulatory Support and Customer Support Services in a simplified format commensurate
with the Covid-19 situation. 
Decision 
The Policy and Resources Committee noted the FQ3 2021/22 Key Performance Indicator
Reports as presented. 
(Reference:  Report  by Executive Director with responsibility for Customer Support Services
dated 17 February 2022, submitted) 
8. LORN ARC TAX INCREMENTAL FINANCE PROGRAMME - UPDATE REPORT 
The Committee gave consideration to a report providing an update on the Lorn Arc
initiative.  The report dealt with proposed amendments to the Tax Incremental Finance
Agreement (TIF) between the Council and the Scottish Government. The report provided
detailed updates on the current live projects at Dunbeg and Oban Airport. 
Decision 
The Policy and Resources Committee – 
1. Noted and endorsed that officers would continue to negotiate with Scottish Government to
seek extension of the TIF project completion and debt repayment deadlines. 
2. Noted the progress made relating to Dunbeg Gateway Features and Halfway House
Roundabout. 
3. Agreed that officers would develop a business case for further Council investment at the Oban
Airport Business Park site for the development of a new headquarters office / hanger building
to be leased on completion to TSL Contractors Limited (TSL) including utilising the remainder
of funding previously approved by the P&R Committee for Oban Airport Business Park.
Page 5

Page 6

4. Agreed that officers would continue to progress with the other innovative proposals for the
Oban Airport Business Park while the funding and tender bids were awaiting conclusion. 
5. Noted that TSL would concurrently progress with the planning process in respect of the
proposed development. 
6. Noted the re-establishment of the Dunbeg Corridor Working Group that had held its first
meeting with key stakeholders. 
(Reference:  Report by Executive Director with responsibility for Development and Economic
Growth dated 18 January 2022, submitted) 
* 9. STRATEGIC EVENTS AND FESTIVALS FUND - ROUND 4 -  2022/23 FUND 
The Committee gave consideration to a report providing an update on Round 4 – 2022/23
of the Council’s Strategic Events and Festivals Fund.  The report provided details of the
bids submitted, the current position with regard to Covid, and recommendations regarding
the eligible bids being put forward to receive grant funding. 
Decision 
The Policy and Resources Committee – 
1. Agreed to the award of eligible SEF Round 4 grants amounting to £94,500. 
2. Agreed to awarding Tarbert Seafood Festival the amount applied for given that funding
is available and that this does not prejudice the other applications.  This would amount
to an additional £800 and would bring the total award for SEF Round 4 grants to
£95,300. 
3. Agreed that any SEF grant offer only be formally issued upon confirmation from the
individual event organisation that the event is formally confirmed and is definitely going
ahead and still meets the SEF Round 4 criteria.  These grants were detailed in
Appendix 1, Table 1, to the submitted report. 
4. Agreed not to award ineligible SEF Round 4 grants as detailed in Table 2 of the
submitted report. 
5. Agreed to continue delegation of powers to the Executive Director with responsibility
for Development and Economic Growth to allow any subsequent amendment to
existing grant requests to be made brought about as a consequence of future Covid
restrictions regarding holding of events/mass gathering in 2022/23. Any amendment to
a current grant request/offer would only be considered if the amendment related to
either the same level or a reduction in the request from and constitute up to 75% of
legitimate and eligible expenditure. 
6. Noted that at the February 2021 Council budget meeting the Council agreed funding of
£90,000 for an SEF Round 4 (2022/23), to be augmented by any underspend in
2020/21 and similarly that the SEF round 3 underspend would be earmarked and
allocated to 2023/2024. 
7. Agreed that the underspend from SEF Round 4 (2022/23) is made available to a
further call for applications with a deadline of April 2022.
Page 6

Page 7

8. Agreed to recommend to Council that any remaining underspend following the call for
further applications from SEF Round 4 (2022/23) is earmarked and used to augment a
future SEF round for 2024/25 – Round 6. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 18 January 2022, submitted) 
10. UK LEVELLING UP FUND - PROGRESS UPDATE 
The Committee gave consideration to a report providing an update on progress inters of
the development of the Levelling Up Fund Bids, following on from the update provided in
September 2021. 
Decision 
The Policy and Resources Committee – 
1. Noted the progress with the two bids and approved that the bids are now titled Argyll
and Bute Western Seaboard Marine Gateways Initiative and Connected Argyll and
Bute. 
2. Approved the removal of the Ardrishaig/Crinan Canal element of the regeneration bid. 
3. Approved the adjustment to the Oban Integrated Transport Hub to become a Hydrogen
Fuelling station (Hydroban). 
4. Approved that up to £150,000 can be drawn down from the Recovery and Renewal
Fund subject to the Chief Executive and the two Executive Directors being satisfied
that the monies are for the purposes of developing the Levelling Up Fund bids. 
5. Agreed that the Chief Executive and the two Executive Directors are delegated
authority to approve any alterations required to elements of the bids, as agreed by
Council in September 2021, as revised today, where this is necessary to meet
deadlines for submission, after consultation with the Leader, Depute Leader and
Leader of the largest Opposition Group. 
6. Agreed that the Chief Executive and the two Executive Directors are delegated
authority to approve the final bid submissions in the period from and including 5 May
2022, when Councillors demit office in anticipation of the Local Government election to
be held on that date, until the first meeting of the Council when an administration is
formed. 
Councillor Douglas Philand, after moving an amendment which failed to find a seconder,
requested that his dissent be recorded from the foregoing decision. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 24 January 2022, submitted) 
Page 7

Page 8

11. RURAL GROWTH DEAL PROGRESS - UPDATE AND RESOURCING OF
BUSINESS CASES 
The Committee gave consideration to a report providing an update on the Rural Growth
Deal.  The report also sought approval to commit further financial resources to support the
development of project business cases and associated project feasibility and development
work. 
Decision 
The Policy and Resources Committee – 
1. Noted progress of the Rural Growth Deal to date, upcoming milestones and the
emerging draft full deal documentation included in Appendices 1-3 to the submitted
report. 
2. Approved a further drawdown of funding from the Inward Investment Fund (circa
£150k).   
3. Agreed that authority for approving the drawdown of this funding is delegated to the
Chief Executive and 2 Executive Directors of the Council up to a maximum value of
£150k and subject to them being satisfied that the monies are for the purpose of
delivering the Rural Growth Deal. Any further funding required in excess of the
approved value would require further approval from the Policy and Resources
Committee. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 18 January 2022, submitted) 
Having previously declared an interest in the following item of business, Councillor Elaine
Robertson left the meeting and took no part in the consideration of this item. 
12. OTHER FUNDING STREAMS: CROWN ESTATES, ISLANDS
INFRASTRUCTURE FUND AND PLACE BASED INVESTMENT FUND 
The Committee gave consideration to a report setting out proposals on the use of the
Scottish Crown Estate funding and the Islands Infrastructure Fund and recommending that
proposals for the Place Based funding are brought back to Committee once the
distribution is known. 
Decision 
The Policy and Resources Committee – 
1. Approved the projects totalling £1,191,151 from the Crown Estate funding as outlined
in the submitted report.    
2. Approved the projects totalling £740,000 from the Islands Infrastructure Fund as
outlined in the submitted report. 
3. Noted that a further report would be brought forward once the final amount of Crown
Estate funding to be distributed in 2022-23 is known.   
Page 8

Page 9

4. Noted that officers would bring forward a report during 2022-23 in respect of Place
Based Investment Funding once the allocation is known. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 31 January 2022, submitted) 
Councillor Elaine Robertson re-joined the meeting at this point. 
13. POLICY AND RESOURCES COMMITTEE WORKPLAN 
The Policy and Resources Committee Workplan was before the Committee for noting. 
Decision 
The Policy and Resources Committee noted the content of the workplan as at February
2022. 
(Reference: Policy and Resources Committee Workplan dated February 2022, submitted) 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following item of business on the grounds
that it was likely to involve the disclosure of exempt information as defined in Paragraphs
8&9 respectively of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 
14. ROTHESAY PAVILION CHARITY - REQUEST FOR FUNDING 
The Committee gave consideration to a report in relation to a revenue request from
Rothesay Pavilion Charity. 
Decision 
The Policy and Resources Committee agreed the recommendations contained within the
submitted report. 
(Reference:  Report by Section 95 Officer dated 2 February 2022, submitted) 
Page 9

Page 10

This page is intentionally left blank

Page 11

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 16 JUNE 2022
BUDGET OUTLOOK 2023-24 TO 2027-28  
1. EXECUTIVE SUMMARY 
1.1 This report summarises the budget outlook covering the period 2023-24 to
2027-28 taking into consideration the budget decisions taken at the Council
Budget meeting held on 24 February 2022.  This is the first outlook of the
financial year and rolls forward previous estimates as well as updating some
estimates and also extends the budget outlook out to 2027-28. The
assumptions will continue to be updated and refined as the year progresses. 
1.2 The estimates within the report are based on the mid-range scenario with best
and worst case scenarios noted in Appendix 1. 
1.3  The assumptions in respect of future years Scottish Government funding
remain unchanged from those reported to full Council on 24 February 2022 and
ranges between 0.5% reduction (best case) and 1.5% reduction (worst case)
with a mid-range reduction of 1.0%.  
1.4 For 2023-24 the Council tax base has been assumed to grow by 1% in the
worst case scenario, 1.5% in the mid-range scenario and 2% in the best case.
In future years this then drops down to 0.25% in the worst case scenario, 0.5%
in the mid-range scenario and 0.75% in the best case. 
1.5 The starting point for the 2023-24 budget is the approved budget for 2022-23
as agreed at Council on 24 February 2022 with the following updates:
 Adjustment relating to additional funding in the finance order that has been
reduced by an assumption for future years.
 Increase in the Council Tax Growth percentage for 2023-24.
 Increase to non-pay inflation
 Small adjustments to the cost and demand pressures 
1.6 The assumptions in respect of employee costs for Council services are as
follows:
 Pay award for 2023-24 to 2027-28 of between 2% in the best and mid-
range scenarios and 5% within the worst case scenario. It is acknowledged
that as the pay award has not yet been agreed it could differ from this
estimate and at this stage we are recognising that possibility as a financial
risk.
 Increments between £0.345m and £0.690m with mid-range £0.690m. 
1.7 For non-pay inflation, only unavoidable/inescapable inflation has been built in
for the best case and mid-range scenarios with a contingency of £0.250m built
into the mid-range. A further general inflationary increase has been built into
Page 11 Agenda Item 4

Page 12

the worst case scenario. 
1.8 There are a number of cost and demand pressures for Council services built
into each scenario:
 Universal Credit – HB Admin grant
 Oracle Financial Ledger Replacement
 ASN Support
 SEEMiS Group – Education Management System
 Removal of charge for milk in schools
 Cashless Catering
 Local Government Election
 New HR System Project Team
 Waste
 Impact of BMW Ban
 Local Development Plan
 House Loans
 Loss of Parking Income
 Increased Bandwidth in Schools. 
1.9 In addition to the identified cost and demand pressures an allowance for
unidentified cost and demand pressures has been included in mid-range and
worst case scenarios of between £0.250m and £0.500m per year. 
1.10 There will be a political decision to be made as to the future allocation to the
Health and Social Care Partnership.  As part of the budget agreed in February
2022, indicative allocations for 2023-24 to 2024-25 were agreed on the basis of
a flat cash allocation. In the budget outlook I have assumed flat cash
allocations across all three scenarios. 
1.11 At this stage a 3% reduction to the Live Argyll Management fee has been
included within the estimates.  At the 2022-23 budget setting meeting in
February 2022 it was agreed to defer the proposed 3% reduction to the Live
Argyll management fee until 2023-24 subject to any future budget decisions. It
was agreed that management would engage in early discussions with Live
Argyll in relation to future approach to support effective longer term financial
planning. 
1.12 The budget gap in the mid-range scenario after allowing for the current base
commitments, employee adjustments, non-pay inflation and cost and demand
pressures and not factoring in any previous savings decisions or future
potential options is an estimated gap over the five year period of £43.566m with
a gap of £9.203m in 2023-24. 
1.13 The measures to balance the budget over the next five years are as follows:
 Proposed increase to fees and charges of between 2% and 4% (3% mid-
range).
 3% reduction to the Live Argyll Management Fee.
 Management/operational savings agreed by Council in February 2022. 
 Policy savings already agreed by Council in February 2022.
Page 12

Page 13

 Proposed increase to Council Tax (3% in all scenarios). 
1.14 In the mid-range scenario, the budget gap estimated over the five year period
2023-24 to 2027-28 is £32.275m with a gap of £6.891m in 2023-24.   
1.15 The budget gap in the best case scenario over the five years is £21.160m with
a gap of £4.337m in 2023-24 and in the worst case scenario, the budget gap
over the five years is £75.256m with a gap of £15.082m in 2023-24.  A
summary of all three scenarios is included within Appendix 1. 
1.16 Given the significant budget gap over the next five years it is proposed that a
cross party Budget Working Group similar to what was in place for both the
2021-22 and 2022-23 budgets, is established and for the group to begin
discussions in August 2022 to allow sufficient time to address the financial
challenges ahead. 
1.17 It is recommended that the Policy and Resources Committee:
a) Consider the current estimated budget outlook position for the period
2023-24 to 2027-28.
b) Agree to the establishment of a cross party Budget Working Group with
a composition of six administration Members, three opposition Members
and two Trade Union representatives and seek nominations for these
positions.   
Page 13

Page 14

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 16 JUNE 2022
BUDGET OUTLOOK 2023-24 TO 2027-28  
2. INTRODUCTION 
2.1 This report summarises the budget outlook covering the period 2023-24 to
2027-28 taking into consideration the budget decisions taken at the Council
Budget meeting held on 24 February 2022.  This is the first outlook of the
financial year and rolls forward previous estimates as well as updating some
estimates and also extends the budget outlook out to 2027-28. The assumptions
will continue to be updated and refined as the year progresses. 
2.2 The budget outlook has been prepared using three different scenarios, best
case, worst case and mid-range.  Relatively small variations in assumptions can
lead to fairly significant changes in the outcome.  In the paragraphs that follow,
the mid-range outlook is shown, however, all three scenarios are detailed within
Appendix 1. 
3.  RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee:
a) Consider the current estimated budget outlook position for the period
2023-24 to 2027-28.
b) Agree to the establishment of a cross party Budget Working Group with a
composition of six administration Members, three opposition Members
and two Trade Union representatives and seek nominations for these
positions.   
4. DETAIL 
4.1 Funding 
Scottish Government Finance Settlement 
4.1.1 On 9 December 2021, the Cabinet Secretary for Finance and Economy
launched a consultation on the Scottish Government’s first multi-year Resource
Spending Review since 2011.  The spending review was due to set out the
spending plans for the remainder of the parliamentary term 2023-24 to 2026-27
and it was hoped that there would be enough transparency and detail as to
provide the Council with more certainty on the funding over the next four years. 
At the time of writing, the spending review has just been published and
unfortunately it’s at a much higher level than anticipated and doesn’t give
sufficient detail on future years funding. 
Page 14

Page 15

4.1.2 When I considered the future funding assumptions as part of the budget in
February, I had reflected on the UK Spending Review published in October
2021. The Scottish Parliament Information Centre (SPICE) analysis of the UK
Budget highlighted that the total (unadjusted) Scottish block grant will increase
from £36.7 billion (excluding COVID funding) in 2021-22 to £41.8 billion by
2024-25. However, as the Table below shows, this is very much front loaded,
with a big real terms increase in 2022-23 (+7.7%), followed by two years of the
Scottish Budget declining, slightly, in real terms. 
UK Spending Review – October 2021
Year Cash Terms Real Terms 
£billion % change £billion % change
2021-22 36.7  36.7 
2022-23 40.6 10.6 39.5 7.7
2023-24 41.2 1.5 39.3 -0.7
2024-25 41.8 1.5 39.1 -0.4 
While the Treasury published ‘Block Grant’ figures are notoriously difficult to
translate into Scottish Budget terms, as a significant number of other factors are
involved, and it is also not known how the Scottish Government will allocate
their block grant to priorities, it still provides some guidance as to future funding
prospects.   
4.1.3 The updated spending envelope figures contained in the spending review show
a small increase to the Total budget with Local Government remaining as flat
cash until 2026-27.  The Government has chosen to prioritise Health and Social
Care and Social Security spending, which received 90% of the increase in the
resource spending budget from 2022-23 to 2025-26.  Whilst this is
disappointing, it is not different to many other spending areas that have been
identified as a priority in the past, for example, Education and Skills is flat cash
through to 2025-26. 
Scottish Resource Spending Review – May 2022
Year Scotland Local Government 
£billion % change £billion % change
2022-23 41.8  10.6 
2023-24 43.3 3.6 10.6 0.0
2024-25 44.4 2.5 10.6 0.0
2025-26 45.6 2.7 10.6 0.0
2026-27 47.5 4.2 10.7 0.9 
What was confirmed in the spending review was that the £120m Scotland wide
(our share £2.146m) announced on 27 January 2022 as part of the Stage 1
Budget Bill has been baselined.   
The figures for Local Government noted in the table above are at portfolio level
(Level 2) and do not include any transfers to Local Government from other
portfolios in-year.  It is likely that we will not know that detail until the budget is
announced in December.  
Page 15

Page 16

4.1.4 The table at paragraph 4.1.2 shows that there was an increase to the Scottish
block of 10.6% in 2022-23, however, our general revenue grant was virtually flat
cash.  Future year increases are much reduced and from the table in paragraph
4.1.3, for Local Government it is expected to be flat cash up to 2025-26.  The
Scottish Government are due to release further detail via COSLA that might
help to analyse the estimates further but at this stage the funding assumptions
as outlined as part of the budget pack in February 2022 still remain and these
will be reviewed when more information becomes available.  The previous
funding assumption was based on a range of between a 0.5% reduction (best
case) and 1.5% (worst case) with a mid-range reduction of 1.0%.   
4.1.5 When the budget was set on 24 February 2022, the funding as published in the
provisional settlement was £207.515m with an additional £2.146m announced
as part of Stage 1 of the budget process (£120m Scotland wide) on 27 January
2022.  When the Finance Order was published on 2 March 2022, an additional
£6.315m had been distributed to Argyll and Bute Council for Discretionary
Housing payments, Scottish Child Bridging Payments, Removal of Curriculum
and Music Tuition Charges, Free School Meals Expansion and school holidays
and Health and Social Care.  This funding was linked to additional policy
commitments that had a matching increase to our expenditure budget and
therefore no bottom line impact.   
4.1.6 When the budget was set on 24 February 2022, the 2021-22 settlement for
Teachers had not been agreed.  As part of the negotiations, the Cabinet
Secretary for Education and Skills wrote to COSLA on 9 December 2021 to
confirm that “the Scottish Government was prepared to make a financial
contribution towards the recurring costs in 2022-23 associated with the
proposed revised pay offer to teachers for 2021-22”. At the time, the exact level
of additional financial support was not known but both the recurring cost and
level of income was calculated at £0.370m.  It has now been confirmed that the
all Scotland funding is £32.8m of which we expect to get 1.58%, £0.518m.  This
amount is due to be paid within 2022-23 and will then form part of the base
budget that will be subject to the assumption of future funding.  An adjustment to
the base budget is also required increasing the base by £0.121m. 
4.1.7 The table below summarises the mid-range scenario estimates expressed in
percentage terms and monetary value. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
% Change to Funding -1.0% -1.0% -1.0% -1.0% -1.0%
Estimated SG Funding
Reduction
(2,016) (2,143) (2,122) (2,101) (2,080)
Estimated SG Funding 214,330 212,187 210,065 207,964 205,884 
Council Tax 
4.1.8 The Council Tax budget for 2022-23 was set at £55.262m which reflected a 3%
inflation increase and 1.5% growth in the Council Tax base as agreed by the
Page 16

Page 17

Council on 24 February 2022. 
4.1.9 During most of 2021-22 council tax growth of 0.25% was assumed in the mid-
range scenario. An assessment was carried out in December 2021 and the
growth was much better than estimated therefore as part of the 2022-23 budget
a growth of 1.5% was built in to 2022-23, with the growth dropping back down to
0.5% in future years.   This position has been further reviewed and it is
estimated that a 1.5% growth in the mid-range (1% in worst case and 2% in best
case) should be maintained for 2023-24 with the drop down to 0.5% in the mid-
range now being pushed back to 2024-25. This will continue to be monitored on
an ongoing basis and any required adjustments will be reported throughout the
year. 
4.1.10 Within this report, I will present the budget gap, prior to any Member based
decisions and therefore at this stage in the report, the Council tax base is
assumed to remain at the same level as 2022-23.   
4.1.11 The table below summarises the estimated total funding in the mid-range
scenario. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Estimated SG Funding 214,330 212,187 210,065 207,964 205,884
Council Tax Base 55,262 55,262 55,262 55,262 55,262
Council Tax Growth 829 1,109 1,391 1,674 1,959
Total Estimated
Funding
270,421 268,558 266,718 264,900 263,105 
4.2 Base Budget 
4.2.1 The 2022-23 budget approved by Council on 24 February 2022 was
£262.812m.   
4.2.2 For future years, there are adjustments required to the base budget from
decisions by Council on 24 February 2022 and other adjustments as noted in
the table below: 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Base Budget 2022-23 262,812 262,812 262,812 262,812 262,812
Additional Funding in
Finance Order (see
paragraph 4.1.4)
6,315 6,315 6,315 6,315 6,315
Additional budget
required in relation to the
Teachers Pay Settlement
2021-22 (see paragraph
4.1.5)
121 121 121 121 121
Adjust for repayment of
Loans Fund Principal
Repayment Holiday
162 170 179 188 197
Page 17

Page 18

Remove one off 2022-23
Election costs
(350) (350) (350) (350) (350)
Remove one off 2022-23
Management/Operational
savings
2,174 2,182 2,182 2,182 2,182
Revised Base Budget 271,234 271,250 271,259 271,268 271,277 
4.3 Employee Cost Changes 
Pay Award 
4.3.1  The pay award for 2022-23 has still to be agreed and this may have an impact
on the base budget if the pay award is greater than the estimate built into the
current year’s budget, which was 2%.   
4.3.2 In March 2022, COSLA Leaders agreed to make an undifferentiated offer of a
2% uplift to all bargaining groups on the basis of parity for all which has been
both a key concern and agreed position for the past number of years.  All
Unions have rejected this initial offer and negotiations are ongoing.   
4.3.3 The COSLA remuneration advisory group, made up of advisors from the Society
of Local Authority Chief Executives (SOLACE), The Directors of Finance and
the Society of Personnel and Development Scotland (SPDS) has noted the
constraints on Local Government funding, with two thirds of Councils having
budgeted for a pay increase of 2% or less.  The 2% increase is deemed to be
affordable, hence why that is the assumption that has been built into the mid-
range scenario.   
4.3.4 For future years, the pay assumption remains at 2% in both the mid-range and
the best case, reflecting that 2% is deemed to be affordable but it is not likely
that the pay award will be less than this.  For scenario purposes, 5% has been
built into the worst case.  There remains a significant risk that the pay award
agreed for 2022-23 and beyond could be higher.  Every 1% over and above
what is budgeted would add an additional pressure of circa £1.5m.   
Increments 
4.3.5 The cost of employee increments for 2022-23 was £0.690m.  There remains a
fairly regular turnover of staff within posts and when this happens the cost of
increments can, in some cases, be absorbed by the budget provision for the
previous post holder, who may have been at the top of the spinal column point
for the grade. This is shown in adjustments to the employee base budget.   
4.3.6 In terms of the budget outlook it has been assumed that for future years, the
best case is assumed to be half of the previous year cost, for mid-range and
worst case, assumes equal to the cost in 2022-23. 
4.3.7 The table below summarises the employee cost increases in the mid-range
scenario for Council services.  The employee cost increases relating to Social
Work within the Health and Social Care Partnership are summarised within
Page 18

Page 19

paragraph 4.6.3. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Pay Award 3,000 6,061 9,182 12,366 15,613
Increments 690 1,380 2,070 2,760 3,450
Total Employee Cost
Changes
3,690 7,441 11,252 15,126 19,063 
4.4 Non-Pay Inflation 
4.4.1 Over the last few years, the Council have only included non-pay inflation within
the budget where it was deemed to be unavoidable or inescapable.  In terms of
the budget outlook, only unavoidable/inescapable non-pay inflation is built into
the best case and mid-range scenarios with a general inflation allowance over
and above this built into the worst case.   
4.4.2  When the 2022-23 budget was set in February, the indicative inflation estimates
from 2023-24 were based on a similar level of inflation to the 2022-23 estimate,
however, it was noted that this would be reviewed for the first budget outlook
presented to the new Council as it was likely that there would be further
increases to inflation, which is indeed the case.  In addition, in terms of utilities,
some of the contracts for 2022-23 were forward purchased and therefore the
level of inflation was not going to be felt within 2022-23. 
4.4.3 Officers have now undertaken a review of areas of non-pay inflation of
significant value and volatility.  The principle of only budgeting for
unavoidable/inescapable remains, however, it has to be noted that in this
current financial climate, some budgets with no inflation allowed for are now
stretched beyond the point of containing the cost within budget and therefore
the budget will now buy less than what it used to be able to buy (so in effect, we
will see some cuts as a result). 
4.4.4 When creating a budget outlook for future years, there is a risk that inflation
assumptions could change during the year.  Due to the current inflation
uncertainty, it would be prudent to include a contingency for other inflation
increases not included in the calculations.  A contingency allowance of £0.500m
is included within the worst case scenario and a £0.250m allowance included
within the mid-range scenario each year.  No contingency is included within the
best case scenario.  This contingency will either be required, reduced or
removed to reflect changing circumstances before the 2023-24 budget process.   
4.4.5  The table below summarises the non-pay inflation increases in the mid-range
scenario for Council services with more detail available in Appendix 2.  The non-
pay inflation increases relating to Social Work within the Health and Social Care
Partnership are summarised within paragraph 4.6.3. 
Page 19

Page 20

Inflation Category 2023-24
Previous
estimates
£000
2023-24
Updated
estimates
£000
Increase
£000
Utilities - Electricity, Gas, Oil, Water 245 1,177 932
Street Lighting Electricity 32 116 84
Vehicle Fuel 62 62 0
Central Repairs - Outside Contractors 57 57 0
Waste PPP/Landfill Tax 455 502 47
NPDO/HUB Schools 651 1,024 373
Community Pool Subsidies 53 60 7
Residential Schools 84 91 7
Pre-Primary Partner Providers 86 86 0
ICT 123 123 0
Catering Purchases and Milk 310 309 (1)
Contingency for unidentified/insufficient
inflation estimate 
250 250
Total 2,158 3,857 1,699 
4.4.6 The inflation for years 2024-25 to 2027-28 is noted in the table below and is
based on future years estimates of inflation at this point it time.  It may be that
the inflation could rise to a peak over the next couple of years and then fall
again and this would alter the estimates in the table below, however, this is very
difficult to predict and the estimates will be kept under review.   
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Unavoidable/Inescapable 6,187 8,661 11,287 14,078
Total Non-Pay Inflation 6,187 8,661 11,287 14,078 
4.5 Cost and Demand Pressures 
4.5.1  Over the last few years, services have worked on the basis of having to contain
any cost and demand pressures within current resources, however, there are a
number of cost and demand pressures already identified for Council services
which were reported as part of the budget in February 2022.  Since the budget
meeting on 24 February 2022 the following changes have been made to the
cost and demand pressures: 
 New – Oracle Financial Ledger System Replacement
 New – Cost of Local Government Elections in 2027-28.
 Amended – Increased SEEMiS pressure for the Education Management
System
 Amended – Profiling of Local Development Plan cost pressure. 
Officers are currently assessing the budget required in respect of the provision
for 1140 hours.  The Scottish Government reduced the funding for this area of
spend in 2022-23 and it is likely that this may create a cost pressure for future
years.  The level of the cost pressure has not been quantified as yet and will be
Page 20

Page 21

updated within a future budget outlook.   
4.5.2  As with inflation, when creating a budget outlook beyond one year, there is a
risk that unknown cost and demand pressures will emerge that have not been
included within the outlook.  It is suggested that no allowance for this is included
within the best case scenario, a £0.500m general allowance is included within
the worst case and a £0.250m allowance included within the mid-range scenario
each year. 
4.5.3 The cost pressures are detailed in appendix 3 and are summarised in the table
below and will be subject to review during the financial year.   
4.5.4  2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Universal Credit – HB
Admin Grant
40 80 120 160 200
Oracle Fusion 35 35 35 35 35
ASN Support 0 75 206 206 206
SEEMiS Membership Fees 9 11 13 16 16
Sustainable rate for partner
providers
342 327 327 327 327
Election costs 0 0 0 0 300
HR System 100 (50) (50) (50) (50)
Waste 7 25 78 (91) (91)
Compliance with BMW Ban 0 400 1,600 1,150 0
Local Development Plan 0 50 0 50 0
House Loans 19 19 19 19 19
Parking 15 15 15 15 15
IT – Increased bandwidth
in schools
26 26 26 26 26
Allowance for pressures in
future years
250 500 750 1,000 1,250
Total Cost and Demand
Pressures 
843 1,513 3,139 2,863 2,253 
4.5.5 The cost and demand pressures relating to Social Work within the Health and
Social Care Partnership are summarised within paragraph 4.6.3. 
4.6 Health and Social Care Partnership 
4.6.1  The Council, at the budget meeting on 24 February 2022, agreed a base
allocation to the HSCP of £69.005m for 2022-23 as well as indicative flat cash
allocations for 2023-24 to 2026-27.  On 2 March 2022 the Local Government
Finance Circular 1/2022 was published which distributed additional funding of
which £4.037m was required to be passed to the HSCP, therefore their
allocation increased from £69.005m to £73.042m.  
4.6.2 In the budget outlook, I have assumed flat cash allocations across all scenarios.
These are only assumptions and it will be a matter for Council to consider as
part of the budget process next year.   
Page 21

Page 22

4.6.3 Social Work services have already identified a number of cost and demand
pressures and these are summarised below and included within Appendix 4 for
information purposes.  It is expected that the HSCP absorb their cost and
demand pressures from their funding allocation.  Note that these only extend to
three years rather than the five years within this Council budget outlook.   
2023-24
£000
2024-25
£000
2025-26
£000
Pay Inflation 1,335 2,671 4,033
Pay Increments 103 206 309
Non-Pay Inflation 3,373 6,674 10,158
Care Services for Younger Adults 417 843 1,278
Adult Services - Supported Living 344 686 1,029
Continuing Care for Looked After
Children
250 500 750
Kintyre Care Centre 750 750 750
Unknown Cost and Demand
Pressures
500 1,000 1,500
Total Cost Increase estimates
for Social Work
7,072 13,330 19,807 
4.7 Estimated Budget Gap PRIOR to Measures to Balance the Budget 
4.7.1 The budget gap in the mid-range scenario after allowing for the current base
commitments, employee adjustment, non-pay inflation and cost and demand
pressures is summarised in the table below.  This is the budget gap prior to
factoring in any previous savings decisions or potential options towards
balancing the budget. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Base Budget 271,234 271,250 271,259 271,268 271,277
Employee Cost Changes 3,690 7,441 11,252 15,126 19,063
Non-Pay Inflation 3,857 6,187 8,661 11,287 14,078
Cost and Demand
Pressures 
843 1,513 3,139 2,863 2,253
Total Estimated
Expenditure
279,624 286,391 294,311 300,544 306,671
Estimated Funding 270,421 268,558 266,718 264,900 263,105
Estimated Budget
Surplus / (Gap)
Cumulative
(9,203) (17,833) (27,593) (35,644) (43,566) 
4.8 Measures to Balance the Budget 
4.8.1 In previous years, a general inflationary increase of 3% has been applied to fees
and charges.  For the budget outlook a range of between 2% (worst case) and
4% (best case) with a mid-range of 3%.  The Council may consider, that in light
Page 22

Page 23

of the increasing inflation we are experiencing on many cost areas, that it would
be appropriate to increase the fees and charges inflation to a higher level.   
4.8.2 A number of policy options were agreed at the Council meeting on 24 February
2022 that impacted on 2023-24 and beyond.   These are now factored into the
budget outlook, reducing the budget gap. 
4.8.3 In terms of Council Tax, a 3% increase has been assumed across all scenarios,
this being the increase applied in 2022-23.  It will be a matter for Council to
decide the level of Council Tax increase.   
4.8.4 In respect of Live Argyll, at the budget meeting on 24 February 2022, Council
agreed to defer the proposed 3% reduction in the management fee for 2022/23
and noted that this will be applied in 2023-24 and will be subject to any future
budget decisions. 3% of the 2022-23 management fee equates to £0.122m and
this reduction has been built into the budget outlook from 2023-24 onwards.  No
further reduction has been built in, this would be a matter for Council to
consider. 
4.8.5 The table below summarises the proposed measures to balance the budget in
the mid-range scenario. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Fees and Charges
Increase
356 722 1,099 1,488 1,888
Management/Operational
Savings February 2021
20 20 20 20 20
Policy Savings February
2021
128 128 128 128 128
Policy Savings agreed
February 2022
3 6 6 6 6
Council Tax Increase  1,683 3,450 5,278 7,170 9,127
Reduction to Live Argyll
Management Fee
122 122 122 122 122
Total Measures to
Balance the Budget
2,312 4,448 6,653 8,934 11,291 
4.9 Estimated Budget Gap AFTER Measures to Balance the Budget 
4.9.1 The table below summarises the estimated budget gap in the mid-range
scenario. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Estimated Budget Gap
Prior to Measures to
Balance Budget
(9,203) (17,833) (27,593) (35,644) (43,566)
Savings Measures 2,312 4,448 6,653 8,934 11,291
Page 23

Page 24

Estimated Budget
Surplus / (Gap)
Cumulative
(6,891) (13,385) (20,940) (26,710) (32,275)
Estimated Budget
Surplus / (Gap) In Year
(6,891) (6,494) (7,555) (5,770) (5,565) 
4.9.2 In the mid-range scenario, the budget gap estimated over the five year period
2023-24 to 2027-28 is £32.275m with a gap of £6.891m in 2023-24.   
4.9.3 The budget gap in the best case scenario over the five years is £21.160m with a
gap of £4.337m in 2023-24 and in the worst case scenario, the budget gap over
the five years is £75.256m with a gap of £15.082m in 2023-24.  A summary of
all three scenarios is included within Appendix 1. 
4.9.4 The changes from the previous anticipated outlook to 2026-27 (as noted at the
budget meeting on 24 February 2022) are summarised in the table below. Note
that the budget meeting report was not extended to 2027-28 which is why the
table below only extends to 2026-27. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
Previously reported budget
surplus / (gap) Cumulative
(7,774) (13,911) (21,166) (26,236)
Additional Funding in the
Finance Order that has been
reduced by assumption for
future years
(63) (126) (188) (249)
£120m additional Scottish
Government Funding baselined
as part of Spending Review
2,125 2,104 2,083 2,062
Increase in Council Tax Growth
in 2023-24
570 607 644 683
Council Tax calculation
adjustment
(24) (58) (106) (173)
Increase to Non-Pay Inflation (1,699) (1,871) (2,186) (2,655)
Increase to Cost Pressures (49) (149) (48) (151)
Additional funding for teachers
pay award
143 138 133 128
Adjustment to base for
teachers pay award
(121) (121) (121) (121)
Minor Rounding adjustments 1 2 15 2
Revised Budget Surplus /
(Gap) Cumulative
(6,891) (13,385) (20,940) (26,710) 
4.10 Budget Working Group 
4.10.1 As part of the 2021-22 and 2022-23 budgets, a cross party Budget Working
Group (BWG) was established comprising of six Members from the
administration, three Members from the opposition and two Trade Union
representatives. The BWG did not have any decision making authority but could
Page 24

Page 25

report to and make recommendations to either the Council or the Policy and
Resources Committee.  Its primary purpose was to engage with officers and
provide scrutiny on the identification of savings options as they are developed. 
4.10.2 Given the significant budget gap over the next five years it is proposed that a
similar group is established to support the 2023-24 budget approach and for the
group to begin discussions in August 2022 to allow sufficient time to address the
financial challenges ahead. 
5. CONCLUSION 
5.1 In the mid-range scenario, the budget gap estimated over the five year period
2023-24 to 2027-28 is £32.275m with a gap of £6.891m in 2023-24.   Council
officers are continuing to further develop savings options during 2022-23 and
these will be presented to members at a future date to help balance the budget
in future years. 
5.2  This is a very challenging budget outlook position and the level of Scottish
Government grant and the pay award are the two assumptions that could alter
the figures significantly.  Both will be kept under close review and the budget
outlook updated as and when further information becomes available.  
5.3 It is proposed that a cross party BWG is established to provide scrutiny on the
identification of savings options with early engagement with services users and
stakeholders to help inform and develop savings options within the financial
envelope. 
6. IMPLICATIONS 
6.1 Policy -  Sets out the budget outlook that provides the financial
envelope for policy decisions.
6.2 Financial -  Sets best, worst and mid-range scenarios in respect of
the budget outlook.  The medium to longer term
financial strategy is being updated and the Council are
actively continuing to pursue opportunities to mitigate
against future budget gaps. 
6.3 Legal -  None directly from this report but Council will need to
balance the budget. 
6.4 HR -  None directly from this report but there is a strong link
between HR and budgets.
6.5 Fairer Scotland Duty - See below
6.5.1 Equalities None directly from this report but any proposals to
address the estimated budget gap will need to consider
equality issues.
6.5.2 Socio Economic Duty None directly from this report but any proposals to
address the estimated budget gap will need to consider
socio economic issues.
6.5.3 Islands Duty None directly from this report but any proposals to
address the estimated budget gap will need to consider
Page 25

Page 26

any island specific issues. 
6.6 Climate Change The Council is committed to addressing climate change
and reviews how Services are delivering this on an
ongoing basis within the available budget resources.
6.7 Risk -  None directly from this report but any proposals to
address the estimated budget gap will need to consider
risk.
6.8 Customer Service - None directly from this report but any proposals to
address the estimated budget gap will need to consider
customer service. 
Kirsty Flanagan
Executive Director/Section 95 Officer
2 June 2022 
Policy Lead for Finance and Commercial Services:  Councillor Gary Mulvaney 
APPENDICES: 
Appendix 1 – Budget Outlook, Best, Worst and Mid-Range Scenarios
Appendix 2 – Non Pay Inflation
Appendix 3 – Cost and Demand Pressures (Council Services)
Appendix 4 – Cost and Demand Pressures (Social Work) 
For further information contact Anne Blue, Interim Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 26

Page 27

BUDGET OUTLOOK 2023-24 to 2027-28 APPENDIX 1
POLICY AND RESOURCES COMMITTEE - 17 JUNE 2022
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Base Budget 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127
Base Budget Adjustments 2,107 2,123 2,132 2,141 2,150 2,107 2,123 2,132 2,141 2,150 2,107 2,123 2,132 2,141 2,150
Revised Base Budget 271,234 271,250 271,259 271,268 271,277 271,234 271,250 271,259 271,268 271,277 271,234 271,250 271,259 271,268 271,277
Pay Award 2,978 6,016 9,114 12,274 15,497 2,978 6,016 9,114 12,274 15,497 7,445 15,262 23,470 32,089 41,138
Pay Increments 345 690 1,035 1,380 1,725 690 1,380 2,070 2,760 3,450 690 1,380 2,070 2,760 3,450
Additional Teacher Costs (23) 23 23 24 24 22 45 68 92 116 (23) 23 23 24 24
Total Employee Cost Changes (Council Services) 3,300 6,729 10,172 13,678 17,246 3,690 7,441 11,252 15,126 19,063 8,112 16,665 25,563 34,873 44,612
Non-Pay Inflation - Council Services 3,476 5,650 7,948 10,377 12,946 3,857 6,187 8,661 11,287 14,078 5,838 9,925 14,177 18,606 23,226
Housing Benefits Admin Grant 40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
Oracle Fusion running costs 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35
ASN Support 0 0 198 198 198 0 75 206 206 206 0 145 444 444 444
SEEMIS Membership Fees 9 11 13 16 16 9 11 13 16 16 9 11 13 16 16
Sustainable Rate for Partner Providers 342 327 327 327 327 342 327 327 327 327 342 327 327 327 327
Election Costs 0 0 0 0 250 0 0 0 0 300 0 0 0 0 350
Software support for a  new HR system & Backfill for
project team. 50 (50) (50) (50) (50) 100 (50) (50) (50) (50) 150 (50) (50) (50) (50)
Waste 7 25 78 (91) (91) 7 25 78 (91) (91) 7 25 78 (91) (91)
Compliance with BMW Ban 0 200 800 800 0 0 400 1,600 1,150 0 0 875 3,500 1,500 0
Planning (Local Development Plan) 0 50 0 50 0 0 50 0 50 0 0 50 0 50 0
House Loans 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
Parking 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
IT - increased bandwidth in schools 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26
Allowance for Cost and Demand Pressures Future Years
0 0 0 0 0 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500
Total Cost and Demand Pressures 543 738 1,581 1,505 945 843 1,513 3,139 2,863 2,253 1,143 2,558 6,027 4,451 3,791
Total Estimated Expenditure PRIOR to measures to
balance the budget 278,553 284,367 290,960 296,828 302,414 279,624 286,391 294,311 300,544 306,671 286,327 300,398 317,026 329,198 342,906
Scottish Government Grant 214,895 213,821 212,752 211,688 210,629 213,817 211,679 209,562 207,466 205,391 212,736 209,545 206,402 203,305 200,256
Specific Funding for Additional Teachers 515 512 509 506 503 513 508 503 498 493 510 502 494 487 480
Council Tax 56,367 56,790 57,216 57,645 58,077 56,091 56,371 56,653 56,936 57,221 55,815 55,955 56,095 56,235 56,376
Total Funding 271,777 271,123 270,477 269,839 269,209 270,421 268,558 266,718 264,900 263,105 269,061 266,002 262,991 260,027 257,112
Budget Surplus / (Gap) PRIOR to measures to balance the
budget (6,776) (13,244) (20,483) (26,989) (33,205) (9,203) (17,833) (27,593) (35,644) (43,566) (17,266) (34,396) (54,035) (69,171) (85,794)
Measures to Balance the Budget:
Fees and Charges 475 963 1,465 1,984 2,517 356 722 1,099 1,488 1,888 237 481 733 992 1,259
Live Argyll - 3% decrease to management fee 122 122 122 122 122 122 122 122 122 122 122 122 122 122 122
Management/Operational Savings agreed February 2021
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Policy savings agreed February 2021 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128
Policy savings reported Agreed February 2022 3 6 6 6 6 3 6 6 6 6 3 6 6 6 6
Council Tax Increase 1,691 3,445 5,265 7,152 9,109 1,683 3,425 5,227 7,092 9,021 1,674 3,403 5,188 7,031 8,933
Council Tax Increase (Growth element) 0 34 69 105 143 0 25 51 78 106 0 17 34 52 70
Total Measures to Balance the Budget 2,439 4,718 7,075 9,517 12,045 2,312 4,448 6,653 8,934 11,291 2,184 4,177 6,231 8,351 10,538
Budget Surplus / (Gap) Cumulative AFTER measures to
balance the budget (4,337) (8,526) (13,408) (17,472) (21,160) (6,891) (13,385) (20,940) (26,710) (32,275) (15,082) (30,219) (47,804) (60,820) (75,256)
Budget Surplus / (Gap) In Year AFTER measures to
balance the budget (4,337) (4,189) (4,881) (4,064) (3,688) (6,891) (6,494) (7,555) (5,770) (5,565) (15,082) (15,137) (17,586) (13,016) (14,436)
Best Case Scenario Worst Case ScenarioMid-Range Scenario
Page 27

Page 28

NON-PAY INFLATION (COUNCIL) Appendix 2
Service Category Basis of Inflation
Inflation
Percentage
Mid Range
2023/24
Council Wide Electricity
Due to current market condition for electricity 20% increase mid range, with a 0.5%
tolerance for best and worst case.
20.00% 484,544
Council Wide Gas
Due to current market condition for gas 75% increase mid range, with a 0.5% tolerance
for best and worst case.
75.00% 371,229
Council Wide Heating Oils
Due to current market condition for heating oils 100% increase mid range, with a 0.5%
tolerance for best and worst case.
100.00% 266,842
Council Wide Solid Fuel
Based on estimates provided by facility services with a 0.5% tolerance for best and
worst case.
8.00% 18,430
Council Wide Water Charges Current rate of inflation with a 0.5% tolerance for best and worst case. 6.20% 36,366
Council Wide Vehicle Fuel Historic rate carried forward from last year - will be reviewed during 2022-23
4.97% 62,000
Council Wide Central Repairs - Outside Contractors Historic rate carried forward from last year - will be reviewed during 2022-23
3.00% 57,000
Council Wide Contingency for unidentified/insufficient inflation estimate £250k built in to mid-range and £500k built in to worst case scenario 250,000
1,546,411
Education Pre-Primary Partner Provider Uplift Historic rate carried forward from last year - will be reviewed during 2022-23
2.50% 86,000
Education External School Placements Based on prior year uplifts 8.00% 90,590
Commercial Services Catering Purchases
Figure used by facility services based on national estimates for year 1 with a 0.5%
tolerance for best and worst case.
15.00% 308,543
Legal & Regulatory Support Leisure SLA-MAKI/Islay Pools
Based on RPI at February 2022 with a 0.5% tolerance in the best and worst case
scenarios.
8.18% 13,757
Legal & Regulatory Support Leisure SLA-Atlantis Based on RPI at April 2022 with a 0.5% tolerance in the best and worst case scenarios.
8.43% 46,673
Legal & Regulatory Support NPDO-Variable Element Based on year on year RPI uplift with a 0.5% tolerance for best and worst case.
8.18% 599,843
Legal & Regulatory Support NPDO-Utilities Rebate RPI at February 2022 with a 0.5% tolerance for best and worst case.
8.20% -23,945
Legal & Regulatory Support NPDO-Electricity
Due to current market condition for electricity 20% increase mid range, with a 0.5%
tolerance for best and worst case.
20.00% 89,930
Legal & Regulatory Support NPDO-Gas
Due to current market condition for gas 75% increase mid range, with a 0.5% tolerance
for best and worst case.
75.00% 119,481
Legal & Regulatory Support NPDO-Heating Oil
Due to current market condition for heating oils 100% increase mid range, with a 0.5%
tolerance for best and worst case.
100.00% 68,801
Legal & Regulatory Support NPDO-LPG
Due to current market condition for gas 75% increase mid range, with a 0.5% tolerance
for best and worst case.
75.00% 53,900
Legal & Regulatory Support NPDO-Water Current rate of inflation with a 0.5% tolerance for best and worst case.
6.20% 21,738
Legal & Regulatory Support HUB-Variable Element Based on year on year RPI uplift with a 0.5% tolerance for best and worst case.
8.18% 93,883
1,569,194
Customer and Support
Services ICT Historic rate carried forward from last year - will be reviewed during 2022-23
15.00% 123,000
Roads and Infrastructure Waste PPP-Private Contractor Inflation Based on RPIX at February 2022 with a 0.5% tolerance for best and worst case.
7.09% 465,049
Roads and Infrastructure Waste PPP-Central Government Inflation
Based on Landfill Tax increase between 21/22 and 22/23 with a 0.5% tolerance for best
and worst case.
1.96% 36,765
Roads and Infrastructure Electricity - Street Lighting
Due to current market condition for electricity 20% increase mid range, with a 0.5%
tolerance for best and worst case.
20.00% 116,305
741,119
3,856,724
Council Wide Total
Executive Director Douglas Hendry - Total
Executive Director Kirsty Flanagan - Total
Total Non-Pay Inflation in the Mid Range
Page 28

Page 29

COUNCIL COST AND DEMAND PRESSURES 2023-24 to 2027-28
Department Service Cost/Demand Pressure 2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
Chief Executive's Unit Financial Services Universal Credit “Full” Service went live in Sept 2018, but managed migration has
been deferred to 2021 and will not be completed until 2024. The DWP will reduce
the Housing Benefit Administration Subsidy they pay to the Council as some
claimants come off of Housing Benefit processed by Council staff and go onto
Universal Credit processed by the DWP.  The Council’s caseload has reduced
marginally since implementation of Universal Credit but it is hard to predict just how
quickly the rest of the working age caseload will migrate from Housing Benefit to
Universal Credit between now and 2024.  These figures represent our best estimates
at this time.
40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
Chief Executive's Unit Financial Services Implementation of new financial ledger system - Oracle Fusion Project 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35
Executive Director -
Douglas Hendry
Education The demand for ASN support in Argyll and Bute has continued to grow with a
significant increase in, and early identification of children and young people
presenting with complex additional support needs, including mental health
difficulties.  It is anticipated that growth continues over the next 5 years however
the extent of this growth is difficult to determine.  Scottish Government statistics
show that the number of pupils identified with ASN has increased markedly since
2010 and there continue to be year on year increases. These increases are likely due
to continued improvements in recording and the introduction of the additional need
types 'Child plans' and ‘Other’ in 2011.   Scottish Government statistical datasets
show that the percentage of school roll in mainstream schools of pupils with ASN
has increased by approximately 3% year on year.  Within many authorities, this
means increased numbers of children accessing specialist provision.
0 0 198 198 198 0 75 206 206 206 0 145 444 444 444
Executive Director -
Douglas Hendry
Education The SEEMiS group, provider of the Council's Education Management Information
System, recently reviewed their long term financial plan and refreshed it to cover
the period 2021/22 to 2025/26.  As a result of this exercise there were implications
on Membership fees with a cost pressure on the Education service arising from
financial year 2023/24.  Indicative membership fees were provided for financial
years 2021/22 to 2022/23 and these have been factored in accordingly.
9 11 13 16 16 9 11 13 16 16 9 11 13 16 16
Executive Director -
Douglas Hendry
Education Removal of 10p charge for milk in Primary Schools from August 2021.  Council
agreed to remove this charge from August 2021 to promote the implementation of
the Healthy Eating in Schools Regulations and the roll out of free school meal to all
Primary pupils by August 2022.
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Executive Director -
Douglas Hendry
Education The existing cashless catering solution in 9 x secondary schools requires upgrading
or replacing as a result of hardware obsolescence and software reaching end of life
and contract end in Jan 2022. This solution is a red risk on the ICT GAMP and is no
longer PSN or Cyberessentials Plus compliant.  Local authorities across the UK have
rapidly transformed their cashless catering and payment solutions during the
pandemic to reflect the trends for online payments, pre-order self service, and
deliver a safer, more efficient service. These trends are reflected in the supplier
marketplace with new solutions now available for online self service payments and
school meal selection with market leaders providing end to end solutions handling
all school fund types in one integrated income management solution.  This will
reduce cash handling and allow school catering to prepare meals to order.
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Executive Director -
Douglas Hendry
Education The Council has had a requirement to deliver 1140 hours of Early Learning and
Childcare from August 2021. The Council has been notified that the ring fenced
funding will be reduced by £1.124m from 2022-23. Also, as part of the 1140
expansion programme, the Scottish Government 'Funding Follows the Child'
guidance, requires local authorities to set a rate locally that is paid to funded
providers in the private and third sectors, including childminders, to deliver the
funded entitlement that allows them to deliver a high quality ELC experience for all
children. This rate should be sustainable and reflect national policy priorities,
including funding to enable payment of the real Living Wage to all childcare workers
delivering the funded entitlement and have a margin for re-investment built in. The
service has worked hard to mitigate the effects of this and has reduced expenditure
as far as possible.  However there remains a funding gap, the service are able to
cover the over spend for 2022-23 from carry forwards so the cost pressure is
requested from 2023-24 onwards. The service will continually review their plans
looking for efficiencies where possible.
342 327 327 327 327 342 327 327 327 327 342 327 327 327 327
Best Case Mid Range Scenario Worst Case
APPENDIX 3
Page 29

Page 30

COUNCIL COST AND DEMAND PRESSURES 2023-24 to 2027-28
Department Service Cost/Demand Pressure 2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
Best Case Mid Range Scenario Worst Case
APPENDIX 3
Executive Director -
Douglas Hendry
Legal and Regulatory
Services
Estimated cost (to be borne by the Council)  of carrying out local Government
elections in May 2027 (and in financial year 2027/28). Operating approx. 100 polling
stations and carrying out poll and count for 11 Multi member wards – requiring 11
separate counts
0 0 0 0 250 0 0 0 0 300 0 0 0 0 350
Executive Director -
Douglas Hendry
Procurement In  February 2019 the Council agreed a £250k procurement policy saving to be
delivered through an increased focus on contract and demand management. This
saving was dependent on the number and type of contracts being tendered for
which have the potential to achieve revenue savings through the procurement
process. It has proved harder to achieve than was first anticipated and this saving
has been removed. As this saving had already been built into future budgets a cost
pressure is required to reverse it.
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Executive Director -
Kirsty Flanagan
HR Costs for a project team for a  new HR system & Backfill . This is a total new system
build. 50 -50 -50 -50 -50 100 -50 -50 -50 -50 150 -50 -50 -50 -50
Executive Director -
Kirsty Flanagan
Waste Additional costs derived from the current waste model. Note that the treatment of
waste going forward has not been fully costed due to uncertainty as to how the
council will deal with the Bio Municipal Waste ban and the Deposit Return Scheme.
Pressure has increased due to an updated waste model.
7 25 78 (91) (91) 7 25 78 (91) (91) 7 25 78 (91) (91)
Executive Director -
Kirsty Flanagan
Waste Achieving compliance with ban on biodegradable municipal waste in 2025.  This is
the estimated revenue costs from potential scenarios, remaining in or coming out of
the current waste PPP contract.  Coming out of the Waste PPP contract would create
an additional one-off cost.  There are also capital cost implications that are not
included within these estimates.  Due to the complexity of the model, estimates are
subject to change. 
0 200 800 800 0 0 400 1,600 1,150 0 0 875 3,500 1,500 0
Executive Director -
Kirsty Flanagan
Planning Local development plan will require to be done under the new Planning legislation
which is a revised process from the current one and will have a 10 year life. The new
process has 2 stages where there is likely to be a cost pressure - a gate check
followed by an examination some time later.
0 50 0 50 0 0 50 0 50 0 0 50 0 50 0
Executive Director -
Kirsty Flanagan
Housing Rightsize budget for House Loans which is a historic budget which has simply been
rolled forward year on year
19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
Executive Director -
Kirsty Flanagan
Parking Loss in income at Glen Loin Car park, Arrochar due to end of lease and responsibility
for car park returning to owners, Luss Estates
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
Executive Director -
Kirsty Flanagan
IT Increased bandwidth for schools to allow digital transformation to support the
move to online learning
26 26 26 26 26 26 26 26 26 26 26 26 26 26 26
Executive Director -
Kirsty Flanagan
Housing Temporary Accommodation for the homeless has had a history of demand led
overspending. The budget is in need of rightsizing.   Costs include property
maintenance, maintenance and replacement of furniture, property rental costs less
benefit payments and the cost of  voids which would include Council Tax and
utilities and loss of benefit payments.
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Council Wide Council Wide Rightsize budget for Apprenticeship Levy which is a historic budget which has simply
rolled forward year on year.  Apprenticeship Levy is charged at a rate of 0.5% of an
employer's paybill but the budget has not been increased in line with salary budget
increases
0 0 0 0 0 0 0 0 0 0 0 0 0 0
Council Wide Council Wide General provision for unidentified Cost and Demand Pressures 0 0 0 0 0 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500
TOTAL 543 738 1,581 1,505 945 843 1,513 3,139 2,863 2,253 1,143 2,558 6,027 4,451 3,791
Page 30

Page 31

SOCIAL WORK COST AND DEMAND PRESSURES - 2023-24 to 2025-26 APPENDIX 4
Service Cost/Demand Pressure 2023-24
£000
2024-25
£000
2025-26
£000
2023-24
£000
2024-25
£000
2025-26
£000
2023-24
£000
2024-25
£000
2025-26
£000
All Social Work Estimated Pay inflation reflecting a best case of 1%, mid range of 2% and worst
case of 3%.
668 1,336 2,011 1,335 2,671 4,033 1,342 2,685 4,068
All Social Work Estimated Pay increments, best case is that 50% of the incremental changes based
on 2022/23 are absorbed and in the mid-range and worst case, the increase is in
line with the increase in 2022/23.
52 103 155 103 206 309 103 206 309
All Social Work Non-pay inflation, best and worst case based on unavoidable/inescapable inflation
and worst case.
2,925 5,737 8,687 3,296 6,518 9,919 3,666 7,277 11,109
All Social Work Non-pay inflation impact of payroll inflation on NHS posts which are recharged to
Social Work.
77 156 239 77 156 239 77 156 239
Adult Care Younger Adults Demand Growth (Excluding Physical Disability): There has been
continuing increase in demand for care and support services for profoundly
disabled younger adults (ie under 65) whose parents have historically provided
care but are no longer able to.  The best case assumes a 1% increase in spending
reflecting the limited service capacity in the area, the mid-range reflects 2%
growth and the worst case reflects 3% growth.
172 345 520 343 694 1,052 515 1,046 1,594
Adult Care Younger Adults Demand Growth - Physical Disability: There has been continuing
increase in demand for care and support services for profoundly disabled younger
adults (ie under 65) whose parents have historically provided care but are no
longer able to.  The best case assumes a 1% increase in spending reflecting the
limited service capacity in the area, the mid-range reflects 2% growth and the
worst case reflects 3% growth.
37 74 112 74 149 226 110 224 341
Adult Services Learning Disability Budget Adjustment - The Learning Disability Supported Living
budget is carrying a recurring unbudgeted commitment of circa £743k which is
contributing to the recurring overspend on the Social Work budget. To address
this situation, it is proposed to realign the budget over the three year period from
2023/24 to 2025/26 whilst also reviewing cases and redesigning services. The
adjustment will be reviewed annually to reflect spending reductions delivered as
well as any changes to funding and practice resulting from the implementation of
the Independent Review of Adult Social Care.
248 495 743 248 495 743 248 495 743
Adult Services Physical Disability Budget Adjustment - The Physical Disability budget is carrying a
recurring unbudgeted commitment of circa £89k which is contributing to the
recurring overspend on the Social Work budget. To address this situation, it is
proposed to realign the budget over the three year period from 2023/24 to
2025/26 whilst also reviewing cases and redesigning services. The adjustment will
be reviewed annually to reflect spending reductions delivered as well as any
changes to funding and practice resulting from the implementation of the
Independent Review of Adult Social Care.
30 60 89 30 60 89 30 60 89
Best Case Mid Range Worst Case
Page 31

Page 32

Service Cost/Demand Pressure 2023-24
£000
2024-25
£000
2025-26
£000
2023-24
£000
2024-25
£000
2025-26
£000
2023-24
£000
2024-25
£000
2025-26
£000
Best Case Mid Range Worst Case
Adult Services Mental Health Budget Adjustment - The Mental Health budget is carrying a
recurring unbudgeted commitment of circa £197k which is contributing to the
recurring overspend on the Social Work budget. To address this situation, it is
proposed to realign the budget over the three year period from 2023/24 to
2025/26 whilst also reviewing cases and redesigning services. The adjustment will
be reviewed annually to reflect spending reductions delivered as well as any
changes to funding and practice resulting from the implementation of the
Independent Review of Adult Social Care and any additional funding provided to
address mental health issues as a consequence of the COVID pandemic.
66 131 197 66 131 197 66 131 197
Children and
Families
Continuing Care demand for Looked After young people who are cared for by the
HSCP. The best case scenario is that the expected additional demand can be
funded from within existing resources as a result of planned improvements to the
service delivery model (eg shift away form high cost external residential care to
local foster and kinship care), the mid case reflects £250k per annum and the
worst case reflects £500k per annum.
0 0 0 250 500 750 500 1,000 1,500
All Social Work Allowance for unknown cost and demand pressures which could arise. The best
case assumes unknown pressures totalling £250k per annum, the mid range £500k
per annum and the worst case £750k per annum.
250 500 750 500 1,000 1,500 750 1,500 2,250
Adult Services Kintyre Care Centre - Potential cost pressure as a result of potential transfer of
KCC facility to HSCP Management.
750 750 750 750 750 750 900 900 900
TOTAL COST AND DEMAND PRESSURES 5,274 9,687 14,253 7,072 13,330 19,807 8,307 15,680 23,339
Page 32

Page 33

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE 
CUSTOMER SUPPORT SERVICES           16 JUNE 2022 
KEY PERFORMANCE INDICATORS FQ4 2021/22 – 
COMMUNITY PLANNING AND DEVELOPMENT
FINANCIAL SERVICES
COMMERCIAL SERVICES
LEGAL AND REGULATORY SUPPORT
CUSTOMER SUPPORT SERVICES 
1.0 EXECUTIVE SUMMARY 
1.1 The Council’s Performance and Improvement Framework (PIF) sets out the   
presentation process for regular performance reporting. As a consequence of
Covid-19 alternative options for each PIF activity have been agreed by the
Executive Leadership Team (ELT). 
1.2 This paper presents the Policy and Resources Committee with the FQ4 2021/22
Key Performance Indicators (KPIs) for Community Planning and Development,
Financial Services, Commercial Services, Legal and Regulatory Support and
Customer Support Services. 
1.3 It is recommended that the Policy and Resources Committee reviews and
scrutinises the FQ4 2021/22 KPI Report as presented. 
Page 33 Agenda Item 5

Page 34

ARGYLL AND BUTE COUNCIL                 POLICY AND RESOURCES COMMITTEE 
CUSTOMER SUPPORT SERVICES 16 JUNE 2022 
KEY PERFORMANCE INDICATORS FQ4 2021/22 – 
COMMUNITY PLANNING AND DEVELOPMENT
FINANCIAL SERVICES
COMMERCIAL SERVICES
LEGAL AND REGULATORY SUPPORT
CUSTOMER SUPPORT SERVICES 
2.0 INTRODUCTION 
2.1. The Council’s Performance and Improvement Framework (PIF) sets out the   
presentation process for regular performance reporting. As a consequence of
Covid-19 alternative options for each PIF activity have been agreed by the
Executive Leadership Team (ELT). 
2.2  This paper presents the Policy and Resources Committee with the FQ4 2021/22
Key Performance Indicators (KPIs) for Community Planning and Development,
Financial Services, Commercial Services, Legal and Regulatory Support and
Customer Support Services, as agreed by Council. 
3.0 RECOMMENDATIONS 
3.1 That members review and scrutinise the FQ4 2021/22 KPI Reports as presented.   
4.0 DETAIL  
4.1  To ensure appropriate monitoring and scrutiny of performance management
during the Council’s Covid-19 response and recovery the ELT have identified a
Council-wide suite of 85 Success Measures detailed within the Service Plans. 
Page 34

Page 35

From within the Service Plans some measures have been identified as Key
Performance Indicators (KPIs) for 2021/22, and are currently reported quarterly
to the appropriate Strategic Committees. 
Pyramid remains ‘live’ with all Success Measures aligned to Service Plans
and updated as agreed. 
4.2 Attached are the KPIs for FQ4 2021/22 that are relevant to the Policy and
Resources Committee (Appendix 1).    
5.0 CONCLUSION
5.1 Simplifying and focusing the performance reports in this manner is a proactive
approach to help minimise back office function/non-essential activities whilst
maintaining a level of service that supports scrutiny, performance monitoring and
out statutory duties.
6.0 IMPLICATIONS
6.1 Policy: None
6.2 Financial: None
6.3  Legal: The Council has a duty to deliver best value under the Local Government
in Scotland Act 2003 
6.4  HR: None
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics: None
6.5.2  Socio-economic Duty: None
6.5.3  Islands: None
6.6 Climate Change
6.7 Risk: Ensures that all our performance information is reported in a balanced
manner
6.8  Customer Service: None 
Douglas Hendry 
Executive Director with responsibility for Commercial Services and Legal and
Regulatory Support 
Kirsty Flanagan
Executive Director with responsibility for Customer Support Services
Page 35

Page 36

Policy Lead for Corporate Services and Community Planning: Councillor John
McAlpine 
Policy Lead for Finance and Commercial Services: Councillor Gary Mulvaney 
25 April 2022                                         
For further information contact: 
Jane Fowler, Head of Customer Support Services
Tel: 01546 604466
APPENDICES
Appendix 1 – Key Performance Indicators for -
 Community Planning and Development FQ4 2021/22
 Financial Services FQ4 2021/22
 Commercial Services FQ4 2021/22
 Legal and Regulatory Support FQ4 2021/22
 Customer Support Services FQ4 2021/22
Page 36

Page 37

FQ4 2021/22 Key Performance Indicators for Community Planning and Development
Indicator: CPD104_02-The percentage of groups who say their effectiveness has increased as a result of capacity building by the team.
Why measure this? This provides an indication of strengthening and developing community groups. This information would be used in inspections of
Community Learning and Development.
This indicator is above target with no change in performance since the last reporting period.
Commentary. Six groups responded across four administrative areas. Their responses positively highlighted successful interaction with the
Community Development Team. These groups had a focus in 2021/22 of delivering Covid-19 impact support to their communities and engaged with
the Council’s Community Development Team for support and advice. Support included access to the Council’s wellbeing service through Health
Assured to support resiliency of volunteers.
Target: Annual FQ4: 75%.
Actual: Annual FQ4: 100% Green.
Benchmark: No Benchmark.
Graph illustration of performance:- CPD104_02-The percentage of groups who say their effectiveness has increased as a result of capacity building
by the team.
Appendix 1
Page 37

Page 38

Indicator: CPD104_03-The percentage of groups whose users say they have an increase in confidence and wellbeing. 
Why measure this? This illustrates whether the delivery of capacity building support sessions is making a difference to individuals. This measure
would be used in inspections of Community Learning and Development. 
This indicator is above target with no change in performance since the last reporting period. 
Commentary Six groups responded across four administrative areas. Their responses positively highlighted successful interaction with the
Community Development Team. These groups had a focus in 2021/22 of delivering Covid-19 impact support to their communities and engaged with
the Council’s Community Development Team for support and advice. 
Target:  Annual FQ4: 75%.
Actual:  Annual FQ4: 100% Green.
Benchmark: 88%. 
Graph illustration of performance:- CPD104_03-The percentage of groups whose users say they have an increase in confidence and wellbeing. 
Appendix 1
Page 38

Page 39

Indicator: CPD116_02-All issues raised at Area Community Planning Groups are considered and responded to by the Management
Committee. 
Why measure this? It is important for all matters raised to be appropriately considered and responded to. 
This indicator is on target with no change in performance since the last reporting period. 
Commentary All issues that have been raised to the Community Planning Partnership (CPP) Management Committee from the Area Community
Planning Groups (ACPG) for a response have been actioned in the year to date (April 2021 – March 2022).
In June 2021 one item was raised by the Oban, Lorn and the Isles ACPG regarding sharing of good practice on climate change. This was duly actioned
by the CPP Climate Change Working Group. 
In the September 2021, December 2021 and March 2022 CPP Management Committee meetings there were no items raised from the ACPGs for a
response. Items raised from the ACPGs to those meetings were for noting only by the CPP Management Committee. 
Target:  Annual FQ4: 100%.
Actual: Annual FQ4: 100% Green.
Benchmark: No Benchmark. 
Graph illustration of performance:- CPD116_02-All issues raised at Area Community Planning Groups are considered and responded to by the
Management Committee. 
Appendix 1
Page 39

Page 40

FQ4 2021/22 Key Performance Indicators for Financial Services 
Indicator: FIS102_01-Maximise distribution of Scottish Welfare Fund. 
Why measure this? We distribute as much of the Scottish Welfare Fund as we can to help vulnerable people. We also have a statutory duty to do
this. 
This indicator is above target. However, due to the nature of this indicator performance cannot be measured against the previous reporting
period. 
Commentary At the end of March we spent £553,815. This is an overspend of £94,988 of our programme funding for 2021/22 of £458,827. The
additional cost has been funded by earmarking. 
Target: Quarterly FQ4: 95.3%.
Actual: Quarterly FQ4: 120.7% Green.
Benchmark: 95.3%. 
Graph illustration of performance:- FIS102_01-Maximise distribution of Scottish Welfare Fund. 
Appendix 1
Page 40

Page 41

Indicator: FIS102_03-Maximise distribution of Discretionary Housing Payment (DHP) Fund. 
Why measure this? We distribute as much of the Discretionary Housing Payment as we can to help vulnerable people. We also have a statutory duty
to do this. 
This indicator is above target. The Target and Actual are cumulative totals for the financial year. 
Commentary Performance continues to be good in this area. As at 31 March 2022 we have spent or committed £882,322 of our total allocation of
£898,799 and have kept within budget while supporting medium and high priority cases. 
Target: Annual FQ4: 96.0%.
Actual: Annual FQ4: 98.2% Green.
Benchmark: 100.0%. 
Graph illustration of performance:- FIS102_03-Maximise distribution of Discretionary Housing Payment (DHP) Fund. 
Appendix 1
Page 41

Page 42

Indicator: FIS102_04a-All new benefit claims are processed promptly. 
Why measure this? We process benefit claims as quickly as we can to help vulnerable people. We also have a statutory duty to do this. 
This indicator is below target and performance has decreased slightly since the last reporting period. 
Commentary Performance at an average processing time of 25.19 days to process as at 31 March 22 does not meet the target of 21 days in the
service plan. From August to March 2022 the increase in Self Isolation Support Grant (SISG) applications aligned with staff shortages has meant an
increase to monthly processing times to between 26 and 27 days per month on average. This has caused the increase in the cumulative average
processing times for the full year to 25.19 days. Benefit Assessors were redeployed to support the administration of the Scottish Government's Self
Isolation Support Grant programme. We have tried to recruit Benefit Assessors to temporary posts using admin funding provided by the Scottish
Government but have been unsuccessful. Some staff are currently working overtime in order to limit the delays in processing new claims. 
Target: Quarterly FQ4: 21 days for new claims (monthly data).
Actual: Quarterly FQ4: 25.19 days Red.
Benchmark: Scottish average 21 days. 
Graph illustration of performance:- FIS102_04a-All new benefit claims are processed promptly. 
Appendix 1
Page 42

Page 43

Indicator: FIS110_01-Increase the total value of rates (NDR) relief awarded. 
Why measure this? Good practice to support local businesses as to their entitlement, by the end of March each year we have to publish the level of
relief to businesses. 
This indicator is above target. However, due to the nature of this indicator performance cannot be measured against the previous reporting
period. 
Commentary With the continuation of the Covid related reliefs for 2021/22 by the Scottish Government the amount of relief granted to eligible
businesses is increasing month on month. At 31 March 2022 the total relief granted to businesses was £24,461,586. This has been excellent
performance from the team as all reliefs have to be applied for and processed - not automatically granted. 
Target: Annual FQ4: £15m.
Actual: Annual FQ4: £24,461,586 Green.
Benchmark: No Benchmark. 
Graph illustration of performance:- FIS110_01-Increase the total value of rates (NDR) relief awarded. 
Appendix 1
Page 43

Page 44

Indicator: FIS110_02-Maintain the percentage of suppliers that are paid within 30 days. 
Why measure this? Based on good practice and to best support small and medium size businesses who rely on cash flow. 
This indicator is on target however performance has decreased slightly since the last reporting period. 
Commentary Despite a significant amount of staff time being spent on testing the new ledger system, this indicator remains on target. Another
period of excellent performance. 
Target: Quarterly FQ4: 95.5%.
Actual: Quarterly FQ4: 95.5% Green.
Benchmark: Scottish average 93.08%. 
Graph illustration of performance:- FIS110_02-Maintain the percentage of suppliers that are paid within 30 days. 
Appendix 1
Page 44

Page 45

Indicator: FIS115_01-The agreed audit plan is delivered. 
Why measure this? The agreed audit plan provides assurance that our processes and procedures are thorough. 
This indicator is on track with no change in performance since the last reporting period. 
Commentary Thirteen audits have been completed as at 31 March 2022. The plan is on track with all reports to be finalised and reported to the
Audit & Scrutiny Committee on or before the June 2022 Committee. 
Target: Quarterly FQ4: 100%.
Actual:  Quarterly FQ4: 100% Green.
Benchmark: Previous year’s performance 100%. 
Graph illustration of performance:- FIS115_01-The agreed audit plan is delivered. 
Appendix 1
Page 45

Page 46

Indicator: FIS115_02-Maintain the high rate of collecting Non-Domestic Rates [NDR]. 
Why measure this? It is important that all local taxes due are collected. We also submit our performance to the Scottish Government. 
This indicator is below target, this is a cumulative total for the financial year. 
Commentary As at 31 March 2021 Non Domestic Rates collected is 96.37% which is slightly less than the council target of 97%.  This is mainly
attributed to changes in legislation for certain reliefs mainly Small Business Bonus Scheme Relief (SBBS) which was previously available to unoccupied
properties who now no longer qualify for 100% relief.  Coronavirus Retail, Hospitality and Leisure Relief (RHL) which had previously been
automatically granted now requires business to make an application and eligibility has been tightened. Therefore the net NDR due increased and
additional work is required to collect the monies due. 
Target: Quarterly FQ4: 97.30% cumulatively at March 2022.
Actual: Quarterly FQ4: 96.37% Red 
Benchmark: Scottish average 97.30%, ABC 97.30%. 
Graph illustration of performance:- FIS115_02-Maintain the high rate of collecting Non-Domestic Rates [NDR]. 
Appendix 1
Page 46

Page 47

Indicator: FIS115_03-Maintain the high rate of collecting Council Tax. 
Why measure this? It is important that all local taxes due are collected. We also submit our performance to the Scottish Government. 
This indicator is above target. The Target and Actual are cumulative totals for the financial year. 
Commentary Council Tax collections have exceeded our target of 96% and at 31 March 2021 the collection figure was 96.28%. This is excellent
performance from the team particularly given the extra pressure of administering Covid related funding streams. 
Target: Quarterly FQ4: 96.10% cumulatively at March 2022.
Actual: Quarterly FQ4: 96.28% Green.
Benchmark: Scottish average 96.10%, ABC 97.30%. 
Graph illustration of performance:- FIS115_03-Maintain the high rate of collecting Council Tax. 
Appendix 1
Page 47

Page 48

FQ4 2021/22 Key Performance Indicators for Commercial Services 
Indicator: COM107_01-Provide quality meals within cost margins to all pupils. 
Why measure this? All pupils have the opportunity for a nutritious, quality school meal. 
This indicator remains within target since the last reporting period. 
Commentary Food cost inflationary pressure continues to be monitored and indications are that this will increase in the next 12 months. Particular
pressures on specific key lines are increasing, with chicken increasing in cost by 18%. Frequent discussions at a national level with supply chain,
Scottish Government (SG) and Scotland Excel are continuing, and officers sit on the Scottish Government chaired Public Sector Food Forum 
The Scottish Local Authorities Economic Development (SLAED) submitted a request to Consortium of Scottish Local Authorities (CoSLA) on 30th
November 2021. The request was to identify the impact of the EU Exit on food and drink supply chains (prices rises) and food security (local
shortages) and how they are intrinsically entwined with other pressing issues, such as rising fuel and energy costs – both for the public sector and
communities in general. Meetings have been held between CoSLA and Argyll and Bute Council Officers to discuss this issue. Further representation
on this issue is to be made with CoSLA Leaders. 
A paper entitled ‘EU Exit Local Impacts on Food Goods and Supply Chains’ was presented to DMT on 28th February 2022. All three recommendations
were noted, in particular the last recommendation “Note the pressing timescales, where the introduction of import controls on agri-foods and plant
imports in July 2022 could have severe implications for remote rural and island communities to receive specific food items (i.e. perishable goods) in
appropriate timescales.” 
The Scottish Parliament's Cross Party Group on Food took place on 27/4/22. The main topic for discussion was the impact of the war in Ukraine on
food supplies and food insecurity. Officers raised the specific issues impacting school meals and are expecting further discussions to take place with
the SG Taskforce in due course as a result of raising this issue. 
Locally, officers continue to explore opportunities to access more local produce, though it is also affected by rising costs, e.g. for fertiliser and feed. 
Target: Quarterly FQ4: +/- 5.00%.
Actual: Quarterly FQ4: -4.00% Green.
Benchmark: +/- 3.00%.
Appendix 1
Page 48

Page 49

Graph illustration of performance:- COM107_01-Provide quality meals within cost margins to all pupils. 
Appendix 1
Page 49

Page 50

FQ4 2021/22 Key Performance Indicators for Legal and Regulatory Support 
Indicator: LRS102_01-Advice and assistance from Welfare Rights is provided to clients to ensure they maximise their income. 
Why measure this? It is important that the correct amount of welfare rights are being claimed for every client. 
This indicator is above target. The Target and Actual figures are cumulative totals for the financial year. 
Commentary Although the year to date figure is below target, the figure for income generated by Welfare Rights in FQ4 is £993,251. This figure is in
excess of the quarter target as there has been an increased number of closed cases. The volume of referrals received overall has reduced due to
Covid-19 as there was an uplift in Universal Credit. 
Target: Quarterly FQ4: £2,750,000.
Actual: Quarterly FQ4: £2,728,847 Red.
Benchmark: No Benchmark. 
Graph illustration of performance:- LRS102_01-Advice and assistance from Welfare Rights is provided to clients to ensure they maximise their
income. 
Appendix 1
Page 50

Page 51

Indicator: LRS110_02-Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal. 
Why measure this? This demonstrates the proportion of local businesses that benefit from contract awards thus supporting and growing the local
economy. 
This indicator is below target and performance has decreased since the last reporting period. 
Commentary There was a decrease from the previous quarter due to the nature of the contracts. However, of the 6 bids made by local contractors, 5
were awarded the contract (83.3%) with a total value of over £911k. A summary of all contracts awarded in FQ4 is available on Pyramid. The
Procurement, Commercial and Contract Management Team continue to support local suppliers by providing useful information on the Council’s
website, i.e. pre-recorded webinars on how to bid for Council contracts, hints and tips for tendering as well as our contract plan, details of upcoming
supplier development events and our category officer’s contact details all of which enable local suppliers to be able to bid for our contracts. The YTD
% is 26.1% (above target). 
Target: Quarterly FQ4: 20.0%.
Actual: Quarterly FQ4: 13.5% Red.
Benchmark: 25.0%. 
Graph illustration of performance:- LRS110_02-Maintain the percentage of local suppliers that benefit from the awards of contracts via the
procurement portal. 
Appendix 1
Page 51

Page 52

Indicator: LRS110_03-Maintain the percentage of Small Medium Enterprises (SMEs) that win council contracts. 
Why measure this? This illustrates the level of support given to Small or Medium Enterprises. This is also reported to the Scottish Government. 
This indicator is above target however performance has decreased since the last reporting period. 
Commentary Performance is above target, however, slight decrease from previous quarter due to the nature of some of the contracts awarded in
FQ4. Of the 34 bids made by Small and Medium Enterprises (SMEs), 30 were awarded the contract. Overall YTD is 88.2%. Detail of contracts bid for
and won by SMEs is available in Pyramid. 
Target: Quarterly FQ4: 76.0%.
Actual: Quarterly FQ4: 81.1% Green.
Benchmark: 83.0%. 
Graph illustration of performance:- LRS110_03-Maintain the percentage of Small Medium Enterprises (SMEs) that win council contracts. 
Appendix 1
Page 52

Page 53

Indicator: LRS110_04-Increase the number of community benefits that are delivered through the contracts we award locally. 
Why measure this? This demonstrates that community benefits are being delivered. 
This indicator is on track and performance has improved since the last reporting period. Please note there is no Target for this indicator. 
Commentary The Procurement, Commercial and Contract Management Team have been working closely with their suppliers to deliver additional
social, economic and environmental value and achieved 40 community benefits through Contract Management, Contract Awards and the Request
List from 1st October 2021 to 31st March 2022. Further detail is available in Pyramid. 
Target: Bi-Annual Oct-March 22: No Target.
Actual: Bi-Annual Oct-March 22: 41 Green.
Benchmark: No benchmark. 
Graph illustration of performance:- LRS110_04-Increase the number of community benefits that are delivered through the contracts we award
locally. 
Appendix 1
Page 53

Page 54

FQ4 2021/22 Key Performance Indicators for Customer Support Services.
Indicator: CSS101_02-Increase public use of corporate social media sites on three categories of information: council news, community
success and general use. 
Why measure this? We issue informative articles on Council services and achievements as well as the area overall. This supports the overall objective
of attracting people to the area. 
This indicator is above target and performance has improved since the last reporting period. 
Commentary We continue to increase followers across all corporate social media channels, using a content approach of council news/general use
info/community news. Covid related information continues to demand space on our channels. By exception, our Twitter following has not increased
sufficiently to meet our target - typically this channel has had a higher following than the others, so less scope for significant growth potentially. We
have updated Twitter targets for the next quarters to reflect more realistic targets. When the part time Insight and Research Officer starts, this post
holder will look further into this to understand more reasons why so we can apply changes as required. 
Target: Quarterly FQ4: 43,021.
Actual: Quarterly FQ4: 43,936 Green.
Benchmark: 40,759. 
Graph illustration of performance:- CSS101_02-Increase public use of corporate social media sites on three categories of information: council
news, community success and general use. 
Appendix 1
Page 54

Page 55

Indicator: CSS101_03-Increase the percentage of telephone service enquiries received by Customer Service Centres that are dealt with
at the first point of contact by the Customer Service Centre. 
Why measure this? This illustrates how we aim to get it 'right first time' with contact through our Customer Service Centre. 
This indicator is above target however performance has decreased slightly since the last reporting period. 
Commentary This figure is based on the number of calls made, answered and transferred. Total number of calls received = 27,653 with 24,075
answered at first point of contact = 94.4%. First point of contact means that the customer service agent has sufficient information at hand to answer
the question for the caller or to log a service request there and then without having to transfer to the service for the answer. The Target for 22/23
has been raised from 82% to 92%. 
Target: Quarterly FQ4: 82.0%.
Actual: Quarterly FQ4: 94.4% Green.
Benchmark: 95.5%. 
Graph illustration of performance:- CSS101_03-Increase the percentage of telephone service enquiries received by Customer Service Centres that
are dealt with at the first point of contact by the Customer Service Centre. 
Appendix 1
Page 55

Page 56

Indicator: CSS108_01-The percentage of Modern Apprentices that go on to a positive destination after completing the Argyll and Bute
Council Modern Apprentice Programme. 
Why measure this? We have created Modern Apprenticeship opportunities, it is important that we measure their success in terms of gaining work or
further training as a result of our investment. 
This indicator is above target however performance has decreased slightly since the last reporting period. 
Commentary Just over 96% of our apprentices are continuing to secure positive destinations on completion of their apprenticeship. There has been
no change since the last quarter. Overall 38 apprentices out of a total of 51 who have completed their apprenticeship have gone on to secure
employment with the council. 
Target: Annual FQ4: 95.0%.
Actual: Annual FQ4: 96.1% Green.
Benchmark: 95.0%. 
Graph illustration of performance:- CSS108_01-The percentage of Modern Apprentices that go on to a positive destination after completing the
Argyll and Bute Council Modern Apprentice Programme. 
Appendix 1
Page 56

Page 57

Indicator: CSS113_01-Deliver the ICT and Digital Strategy Action Plan. 
Why measure this? The actions delivered in the strategy ensure we continue to provide an efficient and effective ICT service to support the
organisation. 
This indicator is on track to a revised plan. 
Commentary Progress reports are presented to every IT Management Team meeting. The Plan is On Track - A full programme of work is underway
including the launch of greater functionality within MS365. With the migration of 2000 corporate users on premise mailboxes and h drive files to
MS365 complete, restrictions for mailbox and personal file share size have been removed. The increase of MS365 Team sites by 10% approx. in
recent weeks, illustrates the enthusiasm of council staff to adopt MSTeams as a hub for collaborative teamwork and as a communications platform
both internally and with external partners. The use of MSForms for surveys and polls within teams meetings are visible across several services that
recognise the flexibility and adaptability of this useful MS365 tool. The recent successful deployment of the Committee Room Video Conferencing
solution is also built upon MSTeams. Our SOCITM Satisfaction 2022 survey has just completed and we are currently assessing feedback. The score for
the long standing metric which measures staff satisfaction with the Office Systems such as Word, Excel, Email, SharePoint, Teams, etc. has risen for
the first time in many years. The survey was conducted 6 months after the migration of users to MS365 and we may be seeing some early evidence
that staff are deriving greater benefit and satisfaction as a result of deploying MS365. 
Target: Annual FQ4: Complete by 2023/24.
Actual: Annual FQ4: On Track Green.
Benchmark: No Benchmark. 
Graph illustration of performance:- CSS113_01-Deliver the ICT and Digital Strategy Action Plan. 
Appendix 1
Page 57

Page 58

Indicator: CSS113_02-Maintain the average time taken to resolve ICT incidents. 
Why measure this? To support the Council to operate effectively and efficiently and any unforeseen ICT incidents are resolved as quickly as possible. 
This indicator is below target (lowest is best) and performance has improved since the last reporting period. 
Commentary Average time to fix service affecting incidents through FQ4 was 2.4 hours. Performance well within target for the quarter despite the
major Kilmory firewall hardware issue in March. 
Target: Quarterly FQ4: 4.5 hrs.
Actual: Quarterly FQ4: 2.4 hrs Green.
Benchmark: 3.0 hrs. 
Graph illustration of performance:- CSS113_02-Maintain the average time taken to resolve ICT incidents. 
Appendix 1
Page 58

Page 59

Indicator: CSS115_01-Increase the percentage of all self-service and automated contacts. 
Why measure this? Increasing the volume of self-service and automated contacts reduces the use of other higher cost channels and improves our
efficiency. 
This indicator is above target and performance has improved since the last reporting period. 
Commentary In FQ4 there were 38,657 transactions dealt with by customer service agents (26.9%) and 105,298 automated or self-service
transaction (73.1%) so the 62% target was well exceeded. Consequently the target for 2022/23 has been raised from 62% to 70% 
Target: Quarterly FQ4: 62.0%.
Actual: Quarterly FQ4: 73.1% Green.
Benchmark: 62.0%. 
Graph illustration of performance:- CSS115_01-Increase the percentage of all self-service and automated contacts. 
Appendix 1
Page 59

Page 60

Indicator: CSS117_01-The percentage of delegates who have reported an increase in their knowledge and/or confidence following
completion of the Argyll and Bute Manager Programme. 
Why measure this? It is important that the investment in the Argyll and Bute Manager Programme delivers the expected and effective outcomes. 
This indicator is on track, however no face to face training has taken place. 
Commentary No employees completed training in FQ4. Sixteen managers were inducted onto the Managing Teams programme in 2021 and it is
anticipated that they will complete in 2022/23.  Fifteen employees were inducted onto the Preparing to Manage programme and it is anticipated
that they will also complete in 2022/23. 
Target: Annual FQ4: 0% Target reduced in light of Covid as no face to face training has occurred.
Actual: Annual FQ4: 0% Green.
Benchmark: No Benchmark. 
Graph illustration of performance:- CSS117_01-The percentage of delegates who have reported an increase in their knowledge and/or confidence
following completion of the Argyll and Bute Manager Programme. 
Appendix 1
Page 60

Page 61

ARGYLL AND BUTE COUNCIL      POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND 
ECONOMIC GROWTH          16 JUNE 2022 
PLACE BASED INVESTMENT AND CROWN ESTATE FUND 2022/23 – INITIAL
PROJECTS AND ALLOCATION 
1.0 EXECUTIVE SUMMARY 
1.1 Argyll and Bute Council has been allocated £712,000 for financial year
2022/23 from Scottish Government, via its Place Based Investment (PBI)
Programme. The purpose of this report to ask members to agree to some
initial projects and respective PBI funding allocations with the allocation of the
remainder of the funding being considered at the August meeting of the Policy
and Resources Committee. 
1.2 The report also asks members to agree to the allocation of Crown Estate
funding for 2022/23 to a number of projects. Whilst the Council has not yet
been advised of the formal allocation for 2022/23, at the February Council
meeting it was advised that it would be considered prudent to commit up to
£1.0m of anticipated funding in 2022/23. Based on the £1.0m allocation and
the spend previously agreed at February Council, there remains £597,453
available to be allocated by members. Members are also asked to agree to a
variation in the originally proposal relating to the allocation of £50,000 of
Crown Estate Scotland (CES) funding to Argyll & the Isles Coast and
Countryside Trust (ACT). This was originally agreed at the Policy and
Resources Committee on 18 February 2021. 
1.3 This is the second year that the Council has been in receipt of Place Based
Investment (PBI) funding from the Scottish Government. The allocation for
2021/22 was £821,000. The Scottish Government committed to providing all
local authorities with Place Based Investment funding on an annual basis to
coincide with their remaining financial years. This means that PBI funding will
be available to the Local Authorities for a further three years following this
year’s allocation. 
1.4 Funding can only be used for capital regeneration projects, and projects must
aim to:
 link and align to place-based initiatives, and establish a coherent local
framework to implement the Place Principle; 
Page 61 Agenda Item 6

Page 62

 support place policy ambitions, such as town centre revitalisation, community-
led regeneration, 20 minute neighbourhoods and Community Wealth Building;  
 ensure that all place-based investments are shaped by the needs and
aspirations of local communities; and,
 accelerate net zero ambitions, wellbeing and inclusive economic
development, tackling inequality and disadvantage, community involvement
and ownership. 
1.5 The funding for 2022/23 must be committed by 31st March 2023 and be
evidenced by at minimum a fully let contract or commencement of works in
order to avoid having to return any unspent funds to Scottish Government.
This means that there is not much time to ensure that we meet with this
timeframe and as such the recommended projects in Table 1 (paragraph 4.7)
are projects that not only have the ability to meet the aims of the fund, but add
value to existing pieces of work and are time critical. 
1.6 The fund links closely to the ongoing reprioritisation focus of the Economic
Growth service, and associated Economic Strategy and Economic Recovery
Plan. With its ‘place’ focus, the fund also builds on and adds value to the
previous year’s PBI funding as well as previous Town Centre Fund
investment, as well as previous regeneration initiatives taken forward by the
council. 
1.7     The Crown Estate funding is targeted at the sustainability of coastal
communities within the following categories:
            Environment
            Community
            Climate Change
            Economic Development.   
As part of the annual reporting requirements for this fund, the Council has to
advise how the funding has been spent across the categories.   
1.8   RECOMMENDATIONS 
It is recommended that Policy and Resources Committee: 
a) Agree to the allocation of the Place Based Investment funding for 2022/23 to
the projects in Table 1, paragraph 4.7.
b) Agree to the allocation of the Crown Estate funding for 2022/23 to the projects
in Table 1, paragraph 4.7.
c) Agree to the amendment to the proposals relating to the award of £50,000 of
CES funding to ACT as detailed under paragraph 2.5.
d) Note that a further report on the allocation of the remaining unallocated
£322,486 Place Based Investment and £397,453 Crown Estate Funding for
2022/23 will be brought forward to the August meeting of the Policy and
Resources Committee.    
Page 62

Page 63

ARGYLL AND BUTE COUNCIL      POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND 
ECONOMIC GROWTH         16 JUNE 2022 
PLACE BASED INVESTMENT AND CROWN ESTATE FUND 2022/23 – INITIAL
PROJECTS AND ALLOCATION 
2.0 INTRODUCTION 
2.1 The council has been allocated £712,000 from Scottish Government for
financial year 2022/23 for capital ‘place’ regeneration projects. In addition to
this year’s allocation, the Scottish Government has committed to continuing to
provide local authorities with funding from its Place Based Investment
Programme on an annual basis for the next 3 financial years. Although the
annual share for Argyll and Bute in subsequent years is yet to be fully
determined, it is likely to be of a level that could deliver a number of key
projects, and which could meaningfully support the economic recovery of the
area. It is also hoped that these funds could act as match funding to unlock
larger projects over time. 
2.2 The purpose of this report to ask members to agree the allocation of Argyll
and Bute Place Based Investment (PBI) for 2022/23 to some initial projects. 
2.3     The initial projects proposed are considered to fit strongly with the PBI criteria,
deliver on the Council’s Economic Recovery Strategy, are time critical, add
value to investment that has already been made by the Council, deliver on our
regeneration outcomes for our places, take account of available officer
resources and take account of the relatively tight timeline that we need to
meet to align with the funding. 
2.4      The purpose of this report is also to ask members to agree to the allocation of
some addition Crown Estate (CE) funding that is expected within 2022/23 to
allow officers to progress with the projects identified. Although the CE
allocation for 2022/23 is not yet confirmed it was recommended at the
February Council meeting that the Council could commit up to £1.0m of
anticipated funding in 2022-23. At that meeting it was agreed to allocate
£402,547 from the £1.0 million leaving £597,453 still available to be allocated.     
2.5     The report also ask members to consider an amendment to a previously
agreed  allocation (Policy & Resources Committee February 2021) of £50,000
under CES funding to Argyll & the Isles Coast and Countryside Trust (ACT) in
regard to the provision of Bute and Cowal climate change satellite pods.  ACT
has consulted with local organisations on how best to deliver on the Crown
Estate proposal which falls under the category of Environment and
Page 63

Page 64

Community and the following changes to the funding are proposed: 
1. £10,000 grant to Bute Community Forest to extend community
engagement by providing e-bike and mountain bike access to the
community forest, working with Fyne Futures.  The funding will pay for
a handover station for the transition between e-bikes, which are
unsuitable in the forest, to mountain bikes.  This would enable the
journey from Rothesay to be car free and would also provide a ‘carbon
free’ product.  If the funding envelope allows, a small pontoon will also
be constructed near Moss Wood.  This £10,000 funding would
therefore go directly to Bute Community Forest. 
2. Remaining £40,000 grant to ACT to assist in enhancing the existing
Dunoon Bike Bothy project including delivery of secure bike storage,
working in partnership with the Dunoon Bothy to deliver on activities
similar to the successful eco hub in Blarbuie Woodland, Lochgilphead,
including a tool library, food share initiative, providing zero carbon
information and supporting the development of cycling in the
area.  These activities aim to promote reuse/refurbish of key products,
diverting them from landfill and would also be a partnership with local
organisations 
3.0 RECOMMENDATIONS 
3.1 It is recommended that Policy and Resources Committee: 
a) Agree to the allocation of the Place Based Investment funding for 2022/23 to
the projects in Table 1, paragraph 4.7. 
b) Agree to the allocation of the Crown Estate funding for 2022/23 to the projects
in Table 1, paragraph 4.7.
c) Agree to the amendment to the proposals relating to the award of £50,000 of
CES funding to ACT as detailed under paragraph 2.5.
d) Note that a further report on the allocation of the remaining unallocated
£322,486 Place Based Investment and £397,453 Crown Estate Funding for
2022/23 will be brought forward to the August meeting of the Policy and
Resources Committee. 
4.0 DETAIL 
4.1 The 2020 Programme for Government committed to establishing a Place
Based Investment Programme (PBIP), linking and aligning place-based
funding initiatives. Scottish Government confirmed that Local Government
would be receiving a share of the PBIP funding over a 5 year period, including
the initial year 2021/22, to support and advance place-based investment and
build on the strong partnership currently existing through the Regeneration
Capital Grant Fund.  As has been the case this year, Argyll and Bute Council
will receive a share of this capital funding over the next 4 years. 
Page 64

Page 65

4.2 Argyll and Bute Council’s allocation for year 1 (2021/22) was £821,000. The
Council’s allocations for this year (2022/23) is £712,000. Forthcoming years
have not yet been determined but if the same percentage were to be applied
against the current total fund figures that have been given, it is estimated that
the Council’s allocation for years 3-5 could be in the region of £500,000 per
year. However, there is no absolute certainty to these figures at this time. 
4.3 The main objectives of the PBIP are:  
 to link and align place-based initiatives, and establish a coherent local
framework to implement the Place Principle; 
 to support place policy ambitions such as town centre revitalisation,
community led regeneration, 20 minute neighbourhoods and Community
Wealth Building; 
 to ensure that all place-based investments are shaped by the needs and
aspirations of local communities; and,
 to accelerate our ambitions for net zero, wellbeing and inclusive economic
development, tackling inequality and disadvantage, community involvement
and ownership. 
4.4 The challenge in respect of the fund is to identify projects that meet the place-
based criteria, and are able to be delivered within short timeframes with our
limited staff resources. Projects to be delivered under the 2022/23 allocation
need to be delivered in a 9 month period and therefore need to be sufficiently
well advanced in terms of their development, straightforward to deliver and/or
be ready to start on site, or be able to be delivered by a third party. 
4.5 Under the PBI allocation for 2021/22 the council supported a total of 8
projects and prior to the commencement of PBI funding the council supported
a total of 28 projects under the previous SG Town Centre Funding stream.  As
a number of those projects being supported through the previous year’s
allocation are ongoing, the key issue has and continues to be the availability
of internal resources to develop and deliver new projects. 
4.6 As with last year’s PBI funding the focus for this year’s PBI fund has to be on
projects that are at delivery stage, and can definitely be delivered. The
projects need to fit with the PBI criteria, have the ability to build on previous
investments, and require the resources to be in place to ensure delivery within
the timescales required by the Scottish Government. The initial projects
identified in Table 1 have therefore been selected on the basis that they are
focusing on existing projects that are well advanced and there is a time
constraint associated with them and they can be readily taken forward to meet
the PBI timelines, and for the added value that they can offer to our
communities. 
4.7 As members will also be aware the Council receives an allocation of funding
from Crown Estate (CE) Scotland each year and whilst confirmation is still
awaited as to the actual allocation for 2022/23 it is estimated that there is still
Page 65

Page 66

sufficient funding that would allow funding from CE to support the delivery of a
number of time critical projects.  The proposed projects and associated
allocation for both PBI and CE are listed below in Table 1 
Table 1 Place Based Investment & Crown Estate Funding 2022/23 Allocation 
Project  Consideration
Fit with
Criteria 
Estimated
Funding
Required
2022/23 
Place
Based
Investment 
2022/23 
Crown Estates
(total award
still to be
confirmed
estimate of
£1million)) 
Lochgilphead CARS Priority
Buildings
To be provided as third party grant
to support the repair of an
additional two Priority Buildings; to
substantially enhance project
outcomes, safeguard historic
buildings and visually lift the area.
Strong fit with
PBI – adds
value to
existing
funding
secured via
Historic
Environment
Scotland 
£200,000 £200,000 £0
Helensburgh Pier – 
Enhanced hard landscaping and
lighting of the masonry pier section
of Helensburgh Pier to improve its
visual appearance and further
enhance this part of the waterfront,
including the views looking out
from the swimming pool and gym.
By ensuring that the surfacing is
seamless and matches the quality
and finishes of the Council’s
Waterfront development project, it
will visually lift this area of the
townscape at this point, increase
pedestrian safety and add value to
the investment already taking
place. 
Fits well with
PBI and CE
criteria – Place
, 20 min
neighbourhood   
Previous
£163,000 PBI
and £92,710
CE award
giving 
Total of
£255,710,
based on
estimate back
in December
2021.
Subsequent
increase costs
based on
estimated
figures from
June 2022.
New figure is
significantly
£89,514 £89,514  £0
Page 66

Page 67

higher
reflecting rises
in construction
costs and is
now £345,224
which leaves
£89,514 of a
shortfall.
Contract ready
to be let. 
Tobermory Harbour Wall and
Railings, Phase 2
To increase the wall height and
introduce new railings to
Tobermory Harbour as the next
phase of harbour improvements; to
mitigate against the effects of
climate change, ensure the retail
core is better protected and safer
for pedestrians.
Fit with PBI
and CE –
Phase 1 was
supported by
CE and TCF 
£450,000
(apply to
IP for
£250,000)
£100,000 £100,000
Jura Passenger Ferry
infrastructure 
The proposal is to replace the
existing ladder system with a small
pontoon and gangway boarding
arrangement that can be
semiportable and deployed on the
Feolin side when required. 
The funding would be used to
provide the community with the
means to safely board and exit the
small replacement craft used as a
passenger only link when the
larger vessels cannot sail. The
access needs to provide a safe
sloped access and floating staging
area for passengers which can
accommodate the small craft
alongside.
Fit with CE
criteria 
Critical
infrastructure
that will
provide
inclusive
access
provision for
Jura
community
and other ferry
users
£100,000 £0 £100,000
TOTALS   £389,514
( PBI
2022/23 is
£712,000
Leaving
£322,486
to still be
allocated )
£200,000 
(if approved
£397,453
remaining for
22/23
assuming
estimated
£1million
allocation )
Page 67

Page 68

4.8 With the Scottish Government having committed PBI funding for the next
three years, it is important to plan how best to take full advantage of the
funding going forward as well as CE future funding. In advance of the third
round of funding, key projects could be identified to allow time for these to be
fully developed to align with the programme and ensure that projects have the
best chance of being delivered. However it may also be considered that it is
beneficial to retain flexibility in regard to future PBI and CE funding to allow
the Council the ability to meet shortfalls in funding relating to existing projects
and complement existing investments. 
5.0 CONCLUSION 
5.1 The relatively tight timescales associated with both of these funds but more
specifically the PBI fund, combined with the large number of existing projects
being delivered by the council, make for a challenging place based investment
programme. The initial projects recommended in this report are focused on those
that are time critical and fit well with the net zero ambitions of the Council and
Government together with the 20 minute neighbourhood/wellbeing context.  The
proposed projects build on investment already in place, or projects identified
through existing Place based work such as the Lochgilphead CARS or
Helensburgh visioning exercises. 
6.0 IMPLICATIONS 
6.1 Policy – There is a need to comply with the Scottish Government ‘place’ policies
as outlined in paragraph 4.3 and associated guidance for the Fund as well as
the Crown Estate fund guidance outlines in paragraph 1.7 
6.2 Financial – The Scottish Government expect that any uncommitted PBI funds
by 1st April 2023 will be returned to Scottish Government.    
6.3  Legal – None 
6.4  HR – Resourced from existing staff 
6.5  Fairer Scotland Duty:
6.5.1   Equalities - protected characteristics - None
6.5.2   Socio-economic Duty – The Fund will support local economies through place-
based centre regeneration activity.
6.5.3 Islands – The Fund will support island economies through place-based
regeneration activity and has the potential to align with, and add value to, the
Islands Infrastructure Investment Fund. 
6.6. Risk – In order for each PBI project to progress to delivery stage, a fully let
contract must be in place by 31st March 2023. The projects will be continually
monitored to ensure that funds can be reallocated to another Place Based
Investment Fund project to avoid having to return any uncommitted funds to
Page 68

Page 69

Scottish Government at this time. 
6.7  Climate Change – the projects deliver towards net zero and address Argyll and
Bute’s carbon footprint.   
6.8  Customer Service - None 
Executive Director with responsibility for Development and Economic Growth:
Kirsty Flanagan 
Policy Lead for Economy and Rural Growth: Councillor Robin Currie   
20 May 2022                                                 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Audrey Martin Transformational Projects and Regeneration Manager 
Audrey.Martin@argyll-bute.gov.uk     
Page 69

Page 70

This page is intentionally left blank

Page 71

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
16 JUNE 2022 
HISTORIC ENVIRONMENT SCOTLAND HERITAGE AND PLACE PROGRAMME -
OPPORTUNITY FOR PLACE BASED HERITAGE FUNDING 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to alert the Council to the new, Historic
Environment Scotland (HES) Heritage & Place Programme and to seek
endorsement for the submission of an expression of interest (EOI). 
1.2 Announced by HES on 30th March 2022, the Heritage & Place Programme
(H&PP) is a competitive, area-based funding programme that aims to
contribute to the development of vibrant and sustainable places in Scotland,
through community-led regeneration of the historic environment. It supports
the development and delivery of heritage focused schemes within
conservation areas, or distinctive heritage areas with local authority
recognition, up to the value of £1.5m, depending on the size of the scheme
and level of match funding. Match funding will be required from the council for
both the development stage were an EOI to be submitted and successful and
further match funding would be required for the delivery stages were the
development stage bid submitted and approved. The level of match funding for
required for the delivery stage (over 5 years) would be much great. 
1.3 Expressions of interest are invited until 31st July 2022; submissions to which
are expected to outline the proposed heritage area and indicative scheme.
The EOI application form is attached as Appendix 1. 
1.4 Should HES support the outline proposal, a Development Phase application
would be invited to be submitted by 15th December 2022, and if the
Development Phase application is subsequently approved, the council would
be invited to work up the project in full, and to submit a formal application
within the following twelve month period. Should the resulting final application
be approved, this would see the project delivered with H&PP grant funding
and the necessary match funding over a period of up to five years (potentially
2024 to 2029). 
1.5      As part of the Development Phase application, the council can apply for a
Development Grant, normally of up to 50% of eligible costs, for research,
investigations, and reports to be produced during your Development Phase,
as well as a dedicated Development Officer. The council would require to
cover the short fall in the development costs, estimated to be £60,000, total
development costs are anticipated to be £120,000. Crown Estate funding may
be a possible source for the council funding. In regard to the Delivery phase
Page 71 Agenda Item 7

Page 72

HES grant funding would cover projects, activities, and management costs to
be undertaken during the Delivery Phase. The percentage of HES grant will
be assessed in relation to the local area context and the overall match funding
package and value for money. Again match funding would be required
including funding from the Council. In previous CARS schemes council
funding has varied from £300,000- £500,000, although it is worth noting that
buildings costs have risen significantly. The Council funding has previously
been made up of a mix of capital funding as well as private sector housing
grant funding. Contribution from building owners would also forms part of the
match funding package. There is the possibility for council capital funding to
come from future Crown Estate funding and it would be spread over a 5 year
period 
1.6 The council has previously secured 8 rounds of funding from HES for
heritage-led regeneration projects, under the Conservation Area Regeneration
Scheme (CARS) programme, which the H&PP replaces. Funding successfully
secured to date equates to £6.6m, not taking into account match funding
secured or wider economic benefit to the local communities. The funding to
date has, and will safeguard historic buildings and enhance the sense of
Place and town centres of Campbeltown, Rothesay, Inveraray, Dunoon,
Lochgilphead and Helensburgh. In many of the CARS schemes there has
been close working and alignment across the council and particularly with
colleagues in housing and building standards to ensure the greatest benefit to
the area and the fabric of the town. 
1.7 In considering the focus and criteria of the new funding programme and taking
into account the towns that have previously been the focus for CARS funding,
it is recommended that the Council consider a possible EOI submission for
either Tarbert, Loch Fyne, or Tobermory, in the style of a CARS. In order to
assess which would have the strongest chance of success an analysis of
each against the criteria will be undertaken, and also discussed with
colleagues in the council and at HES. Given the competitive nature of the fund
the decision has to be based on the town that can offer the strongest fit. 
1.8 There is also an additional opportunity to apply to the National Lottery
Heritage Fund (NLHF) under the Grants for Heritage programme. An EOI is
also required as the first step in applying to this fund, and if invited to
continue, also requires a further 2 stage process. A submission to NLHF will
depend on the scale of the project and fit with their programme. 
RECOMMENDATIONS 
It is recommended that Members: 
i) Agree that an expression of interest be made to Historic Environment
Scotland for the Heritage and Place Programme, and potentially also to
National Lottery Heritage Fund for the Grants for Heritage Programme if
applicable for the conservation town that is considered to best fit with the
Page 72

Page 73

new criteria and to stand the best chance of success bearing in mind that
this will be a highly competitive process. 
ii) Agree that delegated authority be given to the Executive Director of
Development and Infrastructure to submit subsequent applications to the
heritage funders, should the council be invited to do so. 
iii) Agree to the principle of funding from the Council to support the delivery of
the Development Phase should an EOI be successful and a development
grant from HES be offered, normally of up to 50% of eligible costs.  It is
estimated that Council funding would be £60,000 for the development phase
works. 
iv) Agree to the principle of match funding from the Council for the delivery
phase were a stage one development bid to go forward and be successful.
Note that a future report will be brought back to members for their
consideration were this to be the case. 
.  
Page 73

Page 74

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
16 JUNE 2022 
HISTORIC ENVIRONMENT SCOTLAND HERITAGE AND PLACE PROGRAMME -
OPPORTUNITY FOR PLACE BASED HERITAGE FUNDING 
2.0 INTRODUCTION 
2.1 This report seeks to provide members with information relating to the new
Heritage and Place Programme, which provides an opportunity for place
based heritage funding. 
2.2 This report also asks that members agree to the submission of an expression
of interest (EOI) in relation to the respective heritage regeneration funding
programmes of Historic Environment Scotland and possible to National
Lottery Heritage Fund if applicable, with a view to supporting the development
of either a Tarbert, or Tobermory, Heritage and Place Project in the style of a
Conservation Area Regeneration Scheme (CARS).   
3.0 RECOMMENDATIONS 
3.1  It is recommended that Members: 
i) Agree that an expression of interest be made to Historic Environment
Scotland for the Heritage and Place Programme, and potentially also to
National Lottery Heritage Fund if appropriate for the Grants for Heritage
Programme for the conservation town that is considered to best fit with the
new criteria and stand the best chance of success bearing in mind that this
will be a highly competitive process. 
ii) Agree that delegated authority be given to the Executive Director of
Development and Infrastructure to submit subsequent applications to the
heritage funders, should the council be invited to do so. 
iii) Agree to the principle of funding from the Council to support the delivery of
the Development Phase should an EOI be successful and a development
grant from HES be offered, normally of up to 50% of eligible costs.  It is
estimated that Council funding would be up to £60,000 for the development
phase. 
iv) Agree to the principle of match funding from the Council for the delivery
phase were a stage one development bid to go forward and be successful
Page 74

Page 75

and a Delivery Phase grant offered. Note that a future report will be brought
back to members for their consideration were this to be the case. 
4.0 DETAIL 
4.1 On 30th March 2022, Historic Environment Scotland (HES) announced a new
place based heritage fund. The new Heritage & Place Programme (H&PP) is
a competitive area-based funding programme that aims to contribute to the
development of vibrant and sustainable places in Scotland, through
community-led regeneration of the historic environment. It supports the
development and delivery of heritage focused schemes within conservation
areas, or alternatively distinctive heritage areas with local authority
recognition. 
4.2 Grants for the delivery of the programme will typically range from £750k to
£1.5m, depending on the size of the scheme and level of match funding. The
grant priorities are as follows:
 Enable communities to prioritise investment in local historic
environment assets. 
 Renew communities’ sense of place and appreciation of their local
historic environment. 
 Strengthen the resilience of local historic environment assets and build
the capacity of communities to look after them. 
 Build a sustainable base of traditional skills for the local area. 
 Contribute to climate action outcomes for the historic environment.  
 Result in sustainable and inclusive benefits for the local economy. 
4.3 The H&PP supersedes the Conservation Area Regeneration Scheme (CARS)
funding, which HES made available over eight rounds between 2007 and 2019.
The final CARS projects, which seek to use heritage as a driver for
regeneration, are due to conclude on 31st March 2025. 
4.4 Argyll and Bute Council have successfully delivered CARS projects in
Campbeltown, Inveraray and Rothesay to date, and currently have another four
CARS projects in delivery: Rothesay Townscape Heritage (phase 2) and
Dunoon CARS will conclude on 31st March 2023; and Lochgilphead CARS, and
Helensburgh CARS will conclude on 31st March 2025. 
4.5 Over the course of the twelve year period, the council has successfully secured
8 rounds of CARS funding, equating to £6.6m, and which totals £23m of
investment made to 6 key Argyll and Bute town centres when match funding is
also taken into account. 
4.6 Due to the success of the council’s CARS projects to date, there is opportunity
to use this experience in supporting the potential for a seventh CARS style of
project. The town centre locations within Argyll and Bute with conservation
areas, which have not previously been the focus of a CARS and which could
therefore fit well with the scheme, are Tarbert and Tobermory. In order to
determine which would be the priority for this current call  further discussion is
Page 75

Page 76

required with colleagues at HES and within the council and further work requires
to be undertaken to determine which would stand the best chance of success as
it is anticipated that this will be a very competitive process 
4.7 CARS funding was generally open for applications every two to three years, and
although it is anticipated that H&PP will be open for applications on a regular
basis, at this stage HES are unable to confirm when a second round may be
announced and as such taking the opportunity to apply at this stage is
recommended. 
4.8 Much like a CARS, there is an expectation that the H&PP delivery phase will
not exceed 5 years, and a delivery scheme is likely to consist of:
 Repair and resilience capital projects which may involve the reuse of
historic environment assets using appropriate techniques and
materials.
 Traditional skills training and materials activities which target local
needs.
 Community heritage activities.
 A management and maintenance strategy to include activities which
will help to build capacity within communities to value and look after the
historic environment for the longer term. 
4.9  The programme has a two-stage application process, which includes a
Development Phase, to enable a meaningful place-making approach with
strong community engagement. The process is set out as follows:
1) Deadlines for expression of interest – 31st July 2022. 
2) Should HES support the project outline, the council will then be invited
to submit an application for a Development Phase. Up to 50% of the
development phase cost can be supported by HES through the Fund.
3) Deadlines for the Development Phase application – 15th December
2022.
4) Should HES approve the development phase application, the council
will be given up to 12 months to work up and submit an application for
the Delivery Phase. The Development Phase would be expected to
commence April 2023.
5) The deadline for the Delivery Phase application – to be submitted no
later than 12 months from the development phase award. 
4.10  There is also an opportunity to apply to the National Lottery Heritage Fund’s
(NLHF), Grants for Heritage Programme. This too requires an expression of
interest in the first instance, and further to review and indicative support for the
project outline from NLHF, a subsequent application would be invited. For
potential joint funding, the NLHF would consider applications between £0.75m
and £1.5m, and also requires a three stage application process. 
4.11 It should be noted that if the council was successful in any EOI that is submitted
there will be a requirement to identify Council funding towards the Development
Phase costs. HES would provide up to 50% grant funding. It is estimated that
Page 76

Page 77

development costs would be £120,000 requiring £60,000 of match funding from
the Council.  In addition it should also be noted that being invited to submit an
application for the Development Phase or awarded a Development Phase grant,
would not guarantee that the council would be successful at Delivery Phase
application stage. It should also be noted that if successful at the development
phase that the council would require to commit to matching funding for the
Delivery Phase, spread over a 5 year period. It is difficult to estimate costs at
this early stage but previous levels of match funding from the council in regard to
CARS has been in region of £300,000 - £500,000 with Council funding being
made up of a mix of capital funding as well as private sector housing grant
funding. Contribution from building owners would also forms part of the match
funding package. There is the option for council capital funding to come from
future Crown Estate funding and it would be spread over a 5 year period 
5.0 CONCLUSION 
5.1 The place based heritage funding offered by Historic Environment Scotland
(HES) and National Lottery Heritage Fund (NLHF) provides significant
opportunity to support the safeguarding and restoration of key heritage buildings
and structures within the town centres of either Tobermory or Tarbert. 
5.2 It is proposed to undertake further work to understand which of the 2 town
centres would fit best with the Heritage and Place Programme criteria and which
would provide the council with the best chance of securing heritage regeneration
funding, and subsequently submit an expression of interest to HES by 31st July
2022 and potentially also to NLHF depending on the likely scale of the potential
project and fit with criteria. 
6.0 IMPLICATIONS 
6.1 Policy – The submission of an EOI to this new programme will comply with
Council established policy. 
6.2 Financial – There is no initial cost to submit an expression of interest (EOI). 
However should the EOI be successful and the council is asked to progress to
the development phase and a development grant is offered there will be a
requirement for Council funding to assist with the development costs. The
Council funding requirement is estimated to be £60,000 and could come from
Crown Estate funding. It should also be noted that if successful at the
development phase that the council would require to commit to matching
funding for the Delivery Phase, spread over a 5 year period. It is difficult to
estimate costs at this early stage but previous levels of match funding from the
council in regard to CARS has been in region of £300,000 - £500,000 with
Council funding being made up of a mix of capital funding as well as public
sector housing grant funding. Contribution from building owners would also
forms part of the match funding package. There is the option for council
capital funding to come from future Crown Estate funding and it would be
spread over a 5 year period
Page 77

Page 78

6.3  Legal – None arising from this report, however legal agreements may have to be
entered into with Funders should the projects be supported. 
6.4 HR – Staff resources will be required to undertake the necessary work required
to undertake further assessment work and to also submit the EOI. If the EOI
was successful and HES funding secured for the development phase this would
include costs towards the appointment of an officer to take forward the
development phase. 
6.5 Fairer Scotland Duty: 
6.5.1 Equalities - protected characteristics - None
6.5.2 Socio-economic Duty – the new programme is designed to offer improved
socio-economic opportunities for local communities.
6.5.3 Islands – the project if focused on an island will be designed to have a positive
implication. 
6.6 Climate Change – It is a requirement of the funding to fully consider, and
propose mitigation measures to the effects of climate change. 
6.7 Risk – The three stage process and the possibility of two separate funders
means the risk to the ability of aligning is more challenging however HES and
HLHF have stated that they will work closely together to make this as aligned as
possible. It is also reliant on strong support from the local community and
buildings owners including businesses. It is also anticipated that the process will
be highly competitive and the EOI may not be successful. 
6.8 Customer Service - None 
Executive Director with responsibility for Development and Economic Growth:
Kirsty Flanagan 
Policy Lead for Economy and Rural Growth: Councillor Robin Currie 
Policy Lead for Islands and Business Development: Councillor Liz McCabe 
3rd May 2022
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Lorna Pearce, Senior Economic Regeneration Officer
lorna.pearce@argyll-bute.gov.uk 
Page 78

Page 79

Appendix 1 – Heritage and Place Programme, Expression of Interest Application
Form
Page 79

Page 80

This page is intentionally left blank

Page 81

HPP2022-1114 Application Preview
General Information
Scheme Area Details
Application ID
HPP2022-1114
Application Type
Heritage and Place Programme
Organisation Information
Argyll and Bute Council
Kilmory Lochgilphead
Argyll, Argyll and Bute, PA31 8RT
Phone: 0-170-050-1374
Organisation Type: Local Authority
Contact Name
Lorna Pearce
Kilmory Lochgilphead
Argyll
Role: Senior Economic Regeneration Officer
Phone: 0-170-050-1374 x
Email: lorna.pearce@argyll-bute.gov.uk
Scheme Title
Local Authority Area
Argyll and Bute
Will your scheme be delivered or administered jointly with another organisation?
No
HPP2022-1114
 
Page 1 of 5
Page 81

Page 82

Name of Town or City (where the scheme will take place)
Area Location (approximate postcode and datazone ref. numbers)
Does the Scheme Area lie within a recognised heritage area designation?
Conservation Area
Name of conservation area
Date of conservation area designation
Date of the most recent conservation area boundary review, if applicable
Where the area is not a designated conservation area, please give a brief description of the area, its
status, and the name used to describe it.
Has a conservation area or area character appraisal been produced?
No
If no, please give date when this will be undertaken.
Has a conservation area or area management plan been produced?
No
If no, please give date when this will be undertaken.
Please tell us why you think the heritage in this area is important, including who values it and why, and
why this area has been prioritised for funding over other conservation/heritage areas in the local
authority or national park authority area.
HPP2022-1114
 
Page 2 of 5
Page 82

Page 83

Estimated Costs
Please outline the needs and opportunities your scheme will address within the local area.
Provide a description of your scheme proposal, including the key projects and activities to be
delivered.
Approximately when will your area scheme start and finish?
Proposed Development Phase start date (month/year)
Proposed Development Phase end date (month/year)
Proposed Delivery Phase start date (month/year)
Proposed Delivery Phase end date (month/year)
How much do you estimate that your scheme is likely to cost overall (for both Development and
Delivery Phases)?
What are your estimated costs for the Development Phase?
How much funding will you be requesting from HES for the Development Phase?
How much funding from all other sources (including the local authority) will be contributed to the
Development Phase?
HPP2022-1114
 
Page 3 of 5
Page 83

Page 84

Supporting Documents
What are your estimated costs for the Delivery Phase?
How much funding will you be requesting from HES for the Delivery Phase?
How much funding from all other sources (including the local authority) will be contributed to the
Delivery Phase?
Please tell us about anything else, that has not already been covered here, in support of your scheme
expression of interest.
Please upload your supporting documents for your Expression of Interest here.
Map of Scheme Area
Governing document
Accounts
Joint Delivery Agreement
HPP2022-1114
 
Page 4 of 5
Page 84

Page 85

Images of Scheme Area
Area Character Appraisal
Area Management Plan
Other
HPP2022-1114
 
Page 5 of 5
Page 85

Page 86

This page is intentionally left blank

Page 87

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
16 JUNE 2022 
STRATEGIC EVENTS AND FESTIVALS FUND – ROUND 4.2 2022/2023 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to update Members on the further call for
applications in respect of Round 4 2022/23 (referred to as Round 4.2) of the
Council’s Strategic Events and Festivals Fund (SEF). The report provides
details of the bids submitted, and recommendations regarding all the eligible
bids being put forward to receive grant funding.    
1.2 At the February 2021 Council budget meeting the Council agreed funding of
£90,000 for an SEF Round 4 (2022/23), to be augmented by any underspend
in 2020/21 and similarly that the SEF Round 3 underspend would be
earmarked and allocated to 2023/2024. The total budget available to be
allocated for Round 4 2022/23 was £150,164. 
1.3 Under the initial Round 4 call a total of 13 applications were received of which
nine were eligible and were approved by members at the Policy and Resources
(P & R) Committee on 17 February. The nine awards amounted to a total
eligible request of £95,300 which left a budget underspend, (which cannot be
fully clarified until all events have taken place), of circa £55k.  As a consequence
Members agreed at the same P & R Committee to issue a further call for
applications with a deadline of April 2022, referred to as Round 4.2. 
1.4 Round 4.2 - 2022/23 opened on 25 Feb April 2022 and closed on 15 April
2022.  A total of 8 applications were received of which 7 are eligible and
amount to a total eligible request of £29,800. Applications can be viewed at
Appendix 1.  If members agree to the awards as detailed in Appendix 1 this
means that between the initial Round 4 call and Round 4.2 call a total of 16
applications will have been successful amounting to a total grant award of
£125,100. This still leaves a current budget underspend of circa £25,064, which
cannot be fully clarified until events have taken place. 
1.5 Events and festivals contribute significantly to our local economy and
communities across Argyll and Bute and is a key part of the economic
recovery plan for the area however like other key sectors it has faced
significant challenges in the past two years as a consequence of Covid. Many
of our strategic events and festivals have had to either cancel or significantly
reduce in scale. The sector is currently in a period of recovery and continues
Page 87 Agenda Item 8

Page 88

to be fragile and is recognised as such by Scottish Government measures to
support the sector.  The Council’s annual SEF funding plays a key role in the
recovery of the sector and this is clearly demonstrated in the response to both
the initial Round 4 call and the Round 4.2 call with a total of 21 applications
being submitted and approval being given to a total of 16 events. 
RECOMMENDATIONS
It is recommended that Members of the Policy and Resources Committee: 
a) Agree to the award of eligible SEF Round 4.2 grants amounting to
£29,800 to a total of 7 events as detailed in Appendix 1, Table 1. 
b) Agree that any SEF grant offer only be formally issued upon confirmation
from the individual event organisation that the event is formally confirmed
and is definitely going ahead and still meets the SEF Round 4 criteria. 
These grants are detailed in Appendix 1, Table 1. 
c) Agree not to award ineligible SEF Round 4.2 grant as detailed in
Appendix 1, Table 2. 
d) Agree to continue delegation of powers to the Executive Director with
responsibility for Development and Economic Growth to allow any
subsequent amendment to existing grant requests to be made brought
about as a consequence of future Covid restrictions regarding holding
of events/mass gathering in 2022/23. Any amendment to a current
grant request/offer would only be considered if the amendment related
to either the same level or a reduction in the request from and
constitute up to 75% of legitimate and eligible expenditure. 
e) Note that £25,064 would be left to be earmarked towards a future SEF
round as previously agreed by Committee in February 2022.   
Page 88

Page 89

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE
DEVELOPMENT AND ECONOMIC
GROWTH 
16 JUNE 2022 
STRATEGIC EVENTS AND FESTIVALS FUND – ROUND 4.2  2022/23 
2.0 INTRODUCTION
2.1 The purpose of this report is to update Members on the further call for
applications in respect of Round 4 2022/23 (referred to as 4.2) of the Council’s
Strategic Events and Festivals Fund (SEF). The report provides details of the
bids submitted, and recommendations regarding the eligible bids being put
forward to receive grant funding.   
2.2 In recognition of the importance of the events sector to the economy of Argyll
and Bute the SEF Fund was agreed to be set up by the Council and was firstly
taken forward as a competitive fund in 2019/20. A critical element of the
application requirement is that the event or festival be held in Argyll and Bute
and be of a strategic nature, i.e. having the capacity to attract people from
outwith the area, with a focus on national and international visitors, and generate
significant economic benefits for the local community.  To illustrate this, the
estimated economic impact in the area from the funded events and festivals pre-
Covid in Round 1 was circa £7.5m. 
2.3 There is no doubt that Covid has had an unprecedented negative impact on the
events and festivals sector with no events taking place in Argyll and Bute in
2020/21 and only five out of ten that were awarded grant funding under Round
3, taking place in 2021/22, many in a scaled back format.  The Council has
acted promptly to support the industry by complementing event cancellation
support at a national level given by Event Scotland, and by earmarking and
allocating underspend from SEF Round 2 and SEF Round 3 to help support
future Rounds.  The industry continues to face uncertainty and unpredictability
however it is hoped that the sector is on the road to recovery and events will be
able to go ahead this year. 
2.4 To continue to assist with the economic recovery of the events and festivals
sector across Argyll and Bute it is proposed that any underspend from Round
4.2 – 2022/23 is earmarked and used to augment a future SEF round for
2024/2025 – Round 6. 
2.5 The total budget available for SEF Round 4 2022/23 was £150,164. Following
the approval of the 9 eligible applications under the Round 4 first call a total of
£95,300 was agreed by P & R committee leaving circa £55k for Round 4.2 call.
A total of 8 applications have now been received, 7 are considered eligible and
being recommend for approval amounting to a total request of £29,800.  
Page 89

Page 90

Unfortunately, one of the 8 applications does not fit the criteria and is therefore
ineligible.  The applications are listed on Appendix 1 under the headings Table
1 and Table 2. 
3.0 RECOMMENDATIONS
3.1 It is recommended that Members of the Policy and Resources Committee: 
a) Agree to the award of eligible SEF Round 4.2 grants amounting to
£29,800 to a total of 7 events as detailed in Appendix 1, Table 1. 
b) Agree that any SEF grant offer only be formally issued upon confirmation
from the individual event organisation that the event is formally confirmed
and is definitely going ahead and still meets the SEF Round 4 criteria. 
These grants are detailed in Appendix 1, Table 1. 
c) Agree not to award ineligible SEF Round 4.2 grant as detailed in
Appendix 1, Table 2. 
d) Agree to continue delegation of powers to the Executive Director with
responsibility for Development and Economic Growth to allow any
subsequent amendment to existing grant requests to be made brought
about as a consequence of future Covid restrictions regarding holding
of events/mass gathering in 2022/23. Any amendment to a current
grant request/offer would only be considered if the amendment related
to either the same level or a reduction in the request from and
constitute up to 75% of legitimate and eligible expenditure. 
e) Note that £25,064 would be left to be earmarked towards a future SEF
round as previously agreed by Committee in February 2022.   
4.0 DETAIL
4.1 The overarching aim of the Strategic Events and Festivals Fund is to support
event organisers to enhance and grow their events with the result that more
visitors are attracted to Argyll and Bute, providing substantial economic benefit
to the respective areas. The fund will provide critical support in the economic
recovery of the area and may prevent organisations and events from ceasing to
operate. 
4.2 SEF Round 4.2 - 2022/23 opened on 25 February and closed on 15 April
2022.  A total of 8 applications were received of which 7 are eligible and
amount to a total eligible request of £29,800.  These applications can be
viewed at Appendix 1 and show a range of events and festivals from across
the area, and delivering a wide variety of event types, 
4.3 One of the 8 SEF applications is ineligible as unfortunately it does not meet
the criteria for SEF, the event is detailed at Appendix 1, Table 2. The event
Page 90

Page 91

in question, Dark Skies Gigha Stargazing Festival, is a new event and seeks
to take advantage of the fact that the Isle of Gigha is uniquely placed as a
recognised Dark Sky Discovery site of Milky Way Class. The organisers have
stated that it is proposed to grow this event over the next few years to attract
visitors from across the UK and possible beyond however for the first year the
focus is on the community of Gigha with only a very small number, 10 in total,
indicated as coming from outwith the local area. The event in its current form
cannot therefore be classed as strategic as it will not have the capacity to
attract people from outwith the area, nor will it have a focus on national and
international visitors, nor generate significant economic benefits for the local
community. It has therefore not been possible to score the event against the
key criteria such that it would allow this to be put forward for approval. This is
not however to say that this event is not a good event and it is very much
hoped that as the event grows and is able to reach a wider audience that it
will be able to be considered for support from future SEF Rounds. 
4.4 It is fully appreciated that strategic events and festivals are still facing an
unprecedented set of extraordinary and challenging circumstances brought
about as a result of Covid and that this has put a strain on the financial stability
of many of the organisation however it is hoped, given the relaxation of all
restrictions, that the outlook for Argyll and Bute strategic events in 2022, is
looking much more positive at this point. 
4.5 The impact of SEF Round 4 funding is fully recognised in assisting in the
economic recovery of the area and the sustainability of the event organisers. To
further aid recovery the Council previously agreed to earmark underspend to
augment future rounds up to Round 5 2023/24, and to partial release of up to
75% SEF Grant to support legitimate and eligible expenditure incurred in relation
to cancellation of events.  
4.6 Whilst all restrictions have been lifted and the situation is looking much more
positive for events and festivals it is appreciated that there is still a risk that
things could change. It is therefore proposed that the support outlines above
continues for cancelled events as previously agreed.  Also, that any underspend
from SEF Round 4.1 – 2022/23 is earmarked and used to augment a future SEF
round for 2024/2025 – Round 6.  The current estimated underspend based on
Round 4 and round 4.2, which cannot be clarified until events have taken place,
is circa £25,064 
4.7 Event Scotland continue to support events through industry support funds and
fully recognise the fragility of the sector and the need to assist recovery.  It has
recently launched a fund for event businesses affected by the Omicron variant
and a new national programme for events taking place between April –
December 2022.  Council officers are in regular discussion with Event Scotland
to ensure that funding awarded is complementary and does not duplicate
Council funding. 
4.8 In addition, officers will continue to liaise with event organisers who have
successfully applied to SEF Round 4 2022/23 to provide information and support
where appropriate. 
Page 91

Page 92

5.0 CONCLUSION
5.1 Round 4 SEF 2022/23 application and assessment process has been
completed as per the guidance.  Between Round 4 and round 4.2 call a total
of 21 applications were received and a total of 16 events supported leaving an
unallocated budget of £25,064 to be carried over to support Round 6. It is
really encouraging to see the amount of applications received across Round 4
and also the amount of strategic events that the SEF Round 4 funding will be
able to support during 2022. Many of those that applied are strategic events
that had previously applied pre Covid and many are long standing events and
it is excellent to see these being able to take place this year. Whilst the sector
is still fragile it is hoped that the events sector will be able to start to rebuild
itself this year and begin its recovery and there is no doubt that the continued
support to the sector via future  SEF funding will play a key part in this
recovery. 
6.0 IMPLICATIONS
6.1  Policy - The Council’s Economic Strategy supports the value of events and
festivals for their positive impact on the economy 
6.2  Financial - SEF Round 4 2022/23 budget is £150,164.  Between SEF Round 4
& 4.2 calls 16 applications totaling £125,100 are being supported. This leaves
a balance of circa £25,064 to be earmarked for augmenting SEF Round 6
2024/25. 
6.3  Legal - Award letters and grant contracts will be issued as and when a
decision is made and confirmation has been received that the event will go
ahead. 
6.4  HR - Resourced from existing staff 
6.5  Fairer Scotland Duty - The Fund seeks to support the economic growth of
areas.
6.5.1   Equalities - protected characteristics: None
6.5.2   Socio-economic Duty: The Fund seeks to support the economic growth of
areas including a positive contribution to fragile areas.
6.5.3   Islands: The Fund seeks to support island economies by encouraging
increased levels of visitors. 
6.6  Climate Change - As part of the application process events have to
demonstrate net zero and this is part of the scoring process.
6.7  Risk - The full effects of the impact of Covid is still unclear however we have
seen the cancellation of events over the past two years and understand that
the sector is extremely fragile. 
Page 92

Page 93

6.8  Customer Service -  None 
Executive Director with responsibility for Development and Economic Growth:
Kirsty Flanagan 
28th April 2022 
Policy Lead for Economy and Rural Growth: Councillor Robin Currie 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Audrey Martin, Transformation Projects and Regeneration Manager
Audrey.Martin@argyll-bute.gov.uk 
Page 93

Page 94

APPENDIX 1 
Table 1 - SEF Round 4.2 Eligible Grant Applications Received April 2022 
Event Recommended Funding
Award
£2,500 - £5,000 Fund
Oban Winter Festival 5,000
Sea Change Powering Women in Film 2022 4,000
Bute Noir 4,000
Argyll Gathering Oban Games 4,800
Tiree Music Festival 5,000
Tarbert Music Festival 2,000
Helensburgh Christmas Festival  5,000
Total 29,800    
Total SEF Round 4.2  Request  29,800
SEF Round 4 Previously Allocated 95,300
Total Allocated 125,100
22/23 Budget Remaining 25,064 
Table 2 - SEF Round 4.2 Ineligible Grant Applications Received April 2022 
Event Original Funding Requested
£2,500 - £5,000 Fund
Dark Skies Gigha Stargazing Festival 1,600    
Total SEF Round 4.2 Request  1,600 
Page 94

Page 95

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
16 JUNE 2022 
SCOTLAND LOVES LOCAL GIFT CARD UPDATE 
1.0 EXECUTIVE SUMMARY  
1.1 The purpose of this report is to update members on the Scotland Loves Local
Argyll and Bute Gift Card Scheme.   
1.2 The Argyll and Bute Love Local Gift Card formally launched in October 2021
and there are currently 110 businesses registered to accept the gift card as
payment for goods and services throughout Argyll and Bute. Table 1 provides
an overview of the transactions to date:- 
Table 1: Gift Card Transactions
No. of cards sold
to date
Value of cards
sold to date
No. of in store
transactions to
date
In store spend to
date 
235 £12,035.00 78 £2,563.55 
1.3  At the full Council meeting on 28th April 2022, members agreed that the council
commit a share of the Local Authority COVID Economic Recovery (LACER)
Fund to:
 Issue Scotland Loves Local Gift Cards to households in receipt of Council
Tax Reduction Scheme - £797,720;
 Fully fund Gift Card for 2022/2023 into 2023/2024 - £30,000;
 Marketing budget to promote Gift Card - £10,000.
1.4 A report will be brought back to members at a future date to update on the
progress on the take up of the Argyll and Bute Love Local Gift Card. 
RECOMMENDATION 
Members of Policy and Resources Committee are invited: 
a) To consider the contents of the report and the progress of the Scotland
Loves Local Gift Card scheme within Argyll and Bute.  
Page 95 Agenda Item 9

Page 96

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
16 JUNE 2022 
SCOTLAND LOVES LOCAL GIFT CARD UPDATE 
2.0 INTRODUCTION 
2.1 The purpose of this report is to update members on the Scotland Loves Local
Argyll and Bute Gift Card Scheme. Members are invited to view the webpage at
the link below, which provides details of the buisnesses within Argyll and Bute
who have signed up, along with news and updates.   
Argyll and Bute Gift Card - Scotland Loves Local Gift Cards 
3.0 RECOMMENDATIONS 
3.1 Members of the Policy and Resources Committee are asked: 
a) To consider the contents on the report and the progress of the Scotland Loves
Local Gift Card scheme within Argyll and Bute. 
4.0 DETAIL 
4.1 At their meeting of the 12th August 2021, Policy and Resources Committee
agreed to the council taking part in the Scotland Loves Local Gift Card scheme
and to signing the concordat in regard to participation in the fully funded trial
period of one year. Members also agreed to give further consideration to the
possibility of extending the scheme once sufficient information became
available.   
4.2 The Argyll and Bute Gift Card formally launched in October 2021. The scheme
was a year-long pilot, funded by Scottish Government and administered through
the Scotland’s Town Partnership, designed to boost local spending and support
local businesses. 
4.3 During the first year of the scheme, the council sought to promote the gift card
amongst outlets, merchants and visitor attractions in the local authority area.
Officers worked with local stakeholders such as BIDS, Chamber of Commerce
and other community organisations to promote uptake of the card. 
4.4 There are currently 110 businesses registered to accept the card as payment for
Page 96

Page 97

goods and services throughout Argyll and Bute, including retailers, food and
drink providers, health and beauty providers, leisure and accommodation
providers as well as other service providers.  At the time of writing this report,
there are a further 28 businesses in the process of registering to join this
Scheme.   
4.5 Table 1 provides an overview of transactions to date:- 
Table 1: Gift Card Transactions
No. of cards sold
to date
Value of cards
sold to date
No. of in store
transactions to
date
In store spend to
date 
235 £12,035.00 78 £2,563.55 
4.6 COSLA Leaders and Ministers agreed an £80m Local Authority COVID
Economic Recovery (LACER) Fund available to Local Authorities, with the intent
to support local economic recovery and cost of living impacts on low-income
households. At the full Council Meeting of 28th April 2022, members agreed to
commit a share of the LACER Fund to the Gift Card. The approved options
were:- 
 Issue Scotland Loves Local Gift Card to households in receipt of
Council Tax Reduction Scheme - £797,720;
 Fully fund Gift Card for 2022/2023 into 2023/20224 - £30,000;
 Marketing budget to promote Gift Card - £10,000.
4.7 There are 6,531 households in receipt of the Council Tax Reduction Scheme,
and who will receive a Gift Card worth £120. The Gift Card at present can be
spent in a number of retailers such as Aldi, Boots, Marks and Spencer, and
Semi Chem, as well as a host of independent retailers/businesses. Scotland’s
Town Partnership is working to secure other retailers such as Co-op, PayPoint
and SPARs in Argyll and Bute, which would allow recipients to spend their Gift
Card in locally accessible food and energy providers. It is anticipated that the
significant amount of LACER Funds committed will increase business
registration across Argyll and Bute. 
4.8 With the Gift Card now fully funded until 2023/2024, this will allow the scheme to
gather momentum, encourage sign up by more retailers and increase purchase
by consumers to spend money locally and support local economic recovery.
Officers will work with Scotland’s Town Partnership to promote the benefits of
the card and will continue to monitor the benefits of the card and report back to
members. 
4.9 The marketing allocation from the LACER funds will be used to encourage
additional business registration across Argyll and Bute. Officers are currently
considering options for spend and anticipate marketing activity will be rolled out
from the summer months. 
4.10 A report will be brought back to members at a future date to update on the
progress on the promotion and take up of the Love Local Gift Card in Argyll and
Bute.
Page 97

Page 98

5.0 CONCLUSION 
5.1 Members of the Policy and Resources Committee are asked to consider the
contents of the report and the progress of the Scotland Loves Local Gift Card
scheme within Argyll and Bute. 
6.0 IMPLICATIONS 
6.1 Policy – The Gift Card supports Scottish Government’s ‘place’ policies,
particularly the 20 minute neighbourhood concept. 
6.2 Financial – Council has committed a share of LACER funding toward purchase,
continuation and promotion of the Gift Card. 
6.3 Legal – None. 
6.4 HR – It should be noted that work to undertake the promotion of the Shop Local
Card will place an additional call on officer time within the Development and
Economic Growth Service and the council’s Communications Team.   
6.5 Fairer Scotland Duty:
6.5.1 Equalities - protected characteristics – None.
6.5.2 Socio-economic Duty – Council has committed to £797,720 to provide Gift
Cards to individuals in receipt of Council Tax Reduction Scheme. The cards
support local economies through encouraging local spend.
6.5.3 Islands – The Gift Card supports the economy of island communities through
encouraging local spend. 
6.6. Climate Change – The Gift Card supports Climate Change objectives through
encouraging local spend. 
6.7 Risk – Ensuring commitment of £797,720 towards purchase of Gift Card will be
spent. 
6.8 Customer Service – None. 
Executive Director with responsibility for Development and Economic Growth:
Kirsty Flanagan 
Policy Lead for Economic and Rural Growth: Councillor Robin Currie 
6 May 2022                                                  
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Audrey Martin, Transformation Projects and Regeneration Manager
Audrey.Martin@argyll-bute.gov.uk 
Page 98

Page 99

Policy and Resources Committee Work Plan 2022-23
This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. 
Date Report Title Dept/Section How Often? Date Due Comments 
16 June 2022 Budget Outlook 2023-24 to 2027-28  Financial Services   
Key Performance Indicators FQ4
2021/22
Customer Support
Services   
Place Based Investment and Crown
Estate Fund 2022/23 – Projects and
Allocation
Development and
Economic Growth   
Historic Environment Scotland
Heritage and Place Programme –
Opportunity for Place Based
Heritage Funding
Development and
Economic Growth   
Strategic Events and Festivals -
Round 4.2 – 2022/2023
Development and
Economic Growth   
Scotland Loves Local Gift Card
Scheme
Development and
Economic Growth   
Date Report Title Dept/Section How Often? Date Due Comments 
11 August 2022 Financial Report Monitoring Pack  Financial Services Every meeting
except May   
Amended scheme for the
establishment of community councils
in Argyll and Bute: consultation
feedback
Legal & Regulatory
Support   
Key Performance Indictors FQ1 –
2022/2023
Customer Support
Services   
Place Based Investment  Development and
Economic Growth   
Budget Outlook 23-24 to 27-28 Financial Services   
Page 99
Agenda Item
10

Page 100

Policy and Resources Committee Work Plan 2022-23 
Future Items – Date to be determined. 
Climate Change Board Update
Papers
Decarbonisation Action Plan
Commercial
Services   
Page 100