Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
4 August 2022 
NOTICE OF MEETING 
A meeting of the POLICY AND RESOURCES COMMITTEE will be held ON A HYBRID BASIS
BY ATTENDANCE IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD OR
REMOTELY BY MICROSOFT TEAMS on THURSDAY, 11 AUGUST 2022 at 10:30 AM, which
you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
3. MINUTES (Pages 3 - 6)  
Policy and Resources Committee held on 16 June 2022 
4. FINANCIAL REPORTS MONITORING PACK - 30 JUNE 2022 (Pages 7 - 118)  
Report by Section 95 Officer 
5. BUDGET OUTLOOK 2023-24 TO 2027-28 (Pages 119 - 138)  
Report by Section 95 Officer 
6. SERVICE ANNUAL PERFORMANCE REVIEWS 21/22 (Pages 139 - 188)  
Report by Executive Director with responsibility for Customer Support Services 
7. AMENDMENT TO PENSIONS DISCRETIONS POLICY - SHARED COST AVCS
(Pages 189 - 194)  
Report by Executive Director with responsibility for Customer Support Services 
8. UK SHARED PROSPERITY FUND - ARGYLL AND BUTE INVESTMENT PLAN
(Pages 195 - 238)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Public Document Pack

Page 2

9. PLACE BASED INVESTMENT AND CROWN ESTATE FUND 2022/23 –
REMAINING FUNDING ALLOCATIONS AND POSSIBLE PROJECTS 
(Pages 239 - 246)  
Report by Executive Director with responsibility for Development and Economic
Growth 
10. CLIMATE CHANGE UPDATE 
(a) Council Carbon Emissions & Climate Investment 2022 (Pages 247 - 258)   
Report by Executive Director with responsibility for Commercial Services 
(b) Decarbonisation Plan - Action Tracker & Case Studies (Pages 259 - 300)   
Report by Executive Director with responsibility for Commercial Services 
REPORTS FOR NOTING 
11. COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 - UPDATE -
EXPRESSIONS OF INTEREST / ASSET TRANSFER REQUESTS / REPORTING
REQUIREMENTS (Pages 301 - 308)  
Report by Executive Director with responsibility for Commercial Services 
12. POLICY AND RESOURCES WORKPLAN (Pages 309 - 310) 
Policy and Resources Committee 
Councillor Robin Currie (Chair) Councillor Kieron Green
Councillor Audrey Forrest Councillor Jim Lynch
Councillor Yvonne McNeilly Councillor Gary Mulvaney (Vice-Chair)
Councillor Douglas Philand Councillor Ross Moreland
Councillor Amanda Hampsey Councillor Fiona Howard
Councillor Willie Hume Councillor Andrew Kain
Councillor Reeni Kennedy-Boyle Councillor Liz McCabe
Councillor Gordon Blair   
Contact: Hazel MacInnes  Tel: 01546 604269

Page 3

MINUTES of MEETING of POLICY AND RESOURCES COMMITTEE held BY MS TEAMS on
THURSDAY, 16 JUNE 2022 
Present: Councillor Robin Currie (Chair) 
Councillor Gordon Blair
Councillor Audrey Forrest
Councillor Kieron Green
Councillor Amanda Hampsey
Councillor Fiona Howard
Councillor Willie Hume
Councillor Andrew Kain 
Councillor Reeni Kennedy-Boyle
Councillor John McAlpine
Councillor Liz McCabe
Councillor Yvonne McNeilly
Councillor Gary Mulvaney
Councillor Douglas Philand 
Attending: Pippa Milne, Chief Executive
Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director
Patricia O’Neill, Governance Manager
Fergus Murray, Head of Development and Economic Growth 
The Chair of the Policy and Resources Committee started and adjourned the
meeting until 11.30am to address technical issues with the Hybrid meeting. 
1. APOLOGIES FOR ABSENCE 
An apology for absence was intimated from Councillor Lynch. 
2. DECLARATIONS OF INTEREST 
Councillor Fiona Howard declared a financial interest in item 8 of the agenda (Strategic
Events and Festivals) by virtue of her appointment as a trustee of the Helensburgh 
Winter Festival.  She advised that she would leave the meeting during consideration of
this item of business. 
Councillor Reeni Kennedy-Boyle declared a financial interest in item 6 of the agenda
(Place Based Investment and Crown Estate Fund) by virtue of her appointment as
General Manager of Fyne Futures.   She advised that she would leave the meeting
during consideration of this item of business. 
3. MINUTES 
The Minutes of the Policy and Resources Committee held on 17 February 2022 were
approved as a correct record. 
4. BUDGET OUTLOOK 2023-24 TO 2027-28 
The Committee considered a report which summarised the budget outlook covering
the period 2023-24 to 2027-28 taking into consideration the budget decisions taken
at the Council Budget Meeting held on 24 February 2022. 
Decision 
The Committee agreed to - 
Page 3 Agenda Item 3

Page 4

a) The current estimated budget outlook position for the period 2023-24 to 2027-28. 
b) To the establishment of a cross party Budget Working Group with a composition
of six administration Members being Councillors Currie, Mulvaney, McNeilly,
McCabe, Green and Kain, three opposition Members being Councillors Lynch,
Philand and Irvine and two Trade Union representatives. 
(Ref: Report by Section 95 Officer, dated 2 June 2022, submitted) 
Councillor Reeni Kennedy-Boyle joined the meeting at this point. 
5. KEY PERFORMANCE INDICATORS FQ4 2021/22 
The Committee considered a report which outlined the FQ4 2021/22 Key
Performance Indicators (KPIs) for Community Planning and Development, Financial
Services, Commercial Services, Legal and Regulatory Support and Customer
Support Services. 
Decision 
The Committee reviewed and scrutinised the FQ4 2021/22 KPI Report as presented. 
(Ref: Report by the Executive Director with responsibility for Development and
Economic Growth dated 20 May 2022, submitted) 
6. PLACE BASED INVESTMENT AND CROWN ESTATE FUND 2022/23 -
PROJECTS AND ALLOCATION 
The Committee considered a report which advised that the Council had been
allocated £712,000 for financial year 2022/23 from Scottish Government, via its
Place Based Investment (PBI). 
Decision 
The Committee agreed to - 
a) The allocation of the Place Based Investment funding for 2022/23 to the projects
in Table 1, paragraph 4.7. 
b) The allocation of the Crown Estate funding for 2022/23 to the projects in Table 1,
paragraph 4.7. 
c) The amendment to the proposals relating to the award of £50,000 of CES funding
as detailed under paragraph 2.5, and note the amendment of the detail at
paragraph 2.5 which removes funding to ACT, following ACT advising officers
that they are no longer able to deliver the proposal and therefore do not require
the grant, and that the Council will take the lead on the project. 
d) Note that a further report on the allocation of the remaining unallocated £322,486
Place Based Investment and £397,453 Crown Estate Funding for 2022/23 will be
brought forward to the August meeting of the Policy and Resources Committee. 
(Ref: Report by the Executive Director with responsibility for Development and
Economic Growth dated 25 April 2022, submitted)
Page 4

Page 5

7. HISTORIC ENVIRONMENT SCOTLAND HERITAGE AND PLACE PROGRAMME
- OPPORTUNITY FOR PLACE BASED HERITAGE FUNDING 
The Committee considered a report which highlighted the new Historic Environment
Scotland (HES) and sought the endorsement for the submission of an expression of
interest (EDI). 
Decision 
The Committee agreed - 
1. That an expression of interest be made to Historic Environment Scotland for the
Heritage and Place Programme, and potentially also to National Lottery Heritage
Fund for the Grants for Heritage Programme if applicable for the conservation
town that is considered to best fit with the new criteria and to stand the best
chance of success bearing in mind that this will be a highly competitive process. 
2. That delegated authority be given to the Executive Director of Development and
Infrastructure in consultation with the Leader, Depute Leader and Leader of the
largest Opposition Group to submit subsequent applications to the heritage
funders, should the Council be invited to do so. 
3. To the principle of funding from the Council to support the delivery of the
Development Phase should an EOI be successful and a development grant from
HES be offered, normally of up to 50% of eligible costs.  It is estimated that
Council funding would be £60,000 for the development phase works. 
4. To the principle of match funding from the Council for the delivery phase were a
stage one development bid to go forward and be successful.  Note that a future
report will be brought back to Members for their consideration were this to be the
case. 
(Ref: Report by Executive Director with responsibility for Development and Economic
Growth dated 3 May 2022, submitted) 
8. STRATEGIC EVENTS AND FESTIVALS - ROUND 4.2 - 2022/2023 
The Committee considered a report which updated Members on the further call for
applications in respect of Round 4 2022/23 of the Council’s Strategic Events and
Festivals (SED) and provided details of the bids submitted and recommendations
regarding all the eligible bids being put forward to receive grant funding. 
Decision 
The Committee agreed - 
a) To the aware of eligible SEF Round 4.2 grants amounting to £29,800 to a total of
7 events as detailed at Appendix 1, Table 1 of the submitted report. 
b) That any SEF grant offer only be formally issued upon confirmation from the
individual event organisation that the event is formally confirmed and is definitely
going ahead and still meets the SEF Round 4. Criteria.  These grants are detailed
in Appendix 1, Table 1.
Page 5

Page 6

c) Not to award ineligible SEF Round 4.2 grant as detailed in Appendix 1, Table 2. 
d) To continue delegation powers to the Executive Director with responsibility for
Development and Economic Growth to allow any subsequent amendment to
existing grant requests to be made brought about as a consequence of future
Covid restrictions regarding holding of events/mass gathering in 2022/23.  Any
amendment to a current grant request/offer would only be considered if the
amendment related to either the same level or a reduction in the request from the
constitute up to 75% of legitimate and eligible expenditure. 
e) To note that £25,064 would be left to be earmarked towards a future SEF round
as previously agreed by Committee in February 2022. 
(Ref: Report by Executive Director with responsibility for Development and Economic
Growth dated 28 April 2022, submitted) 
9. SCOTLAND LOVES LOCAL GIFT CARD UPDATE 
The Committee considered a report which updated Members on the Scotland Loves
Local Argyll and Bute Gift Card Scheme. 
Decision 
The Committee considered the contents of the report and the progress of the
Scotland Loves Local Gift Card scheme within Argyll and Bute. 
(Ref: Report by Executive Director with responsibility for Development and Economic
Growth dated 6 May 2022, submitted) 
10. POLICY AND RESOURCES WORKPLAN 
The Policy and Resources Committee Workplan was before the Committee for
noting. 
Decision 
The Policy and Resources Committee noted the content of the workplan as at June
2022. 
(Ref: Policy and Resources Committee Workplan dated June 2022, submitted) 
Page 6

Page 7

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 11 AUGUST 2022
FINANCIAL REPORTS MONITORING PACK – 30 JUNE 2022
1. INTRODUCTION
1.1 This report provides a summary of the financial monitoring reports as at the end of
June 2022. There are five detailed reports, setting out the position as at 30
June 2022,  which are summarised in this Executive Summary: 
• Revenue Budget Monitoring Report
• Monitoring of Financial Risks
• Capital Plan Monitoring Report
• Treasury Monitoring Report
• Reserves and Balances
2. DETAIL
2.1 Revenue Budget Monitoring Report
2.1.1 This report provides a summary of the current revenue budget monitoring position to
ensure net expenditure is contained within budget.  It provides corporate and
departmental information with comparisons on a forecast outturn and a year to date
basis. 
2.1.2 There is no reported overall under or overspend position for the Council at June
2022.  As this is early in the financial year it is common for there to be no forecast
variances processed at this time.
2.1.3 There is a year to date underspend of £1.087m.  The year to date variances tend to
relate to the timing of income and expenditure and recharging of costs to capital. 
The financial ledger system replacement and downtime has meant that budget
profiles were unable to be refined in the first quarter of the financial year so profiling
issues are a common theme throughout the detailed departmental budget monitoring
reports. 
2.1.4 With regard to the ongoing financial impact of COVID-19, there are £9.510m of
reserves committed to manage the impact of the pandemic. The detail behind these
commitments is contained within Appendix 2 of the Reserves and Balances report.
2.1.5 Total policy savings relevant to 2022-23 financial year amount to £1.560m.  The
table below outlines their progress as at 30 June 2022. 
Page 7 Agenda Item 4

Page 8

Category No. of
Options
2022-23
£000
2022-
23
FTE
2023-24
£000
2023-
24
FTE
Future
Years
£000
Future
Years
FTE
Delivered 5 235.0 1.4 243.0 1.4 243.0 1.4
On Track to be Delivered 12 603.5 0.5 606.5 0.5 609.5 0.5
Still to be Implemented 2 294.7 0.0 414.3 0.0 414.3 0.0
Being Developed 0 0.0 0.0 0.0 0.0 0.0 0.0
Potential Shortfall 4 402.5 0.0 402.5 0.0 402.5 0.0
Delayed 1 24.0 0.0 24.0 0.0 24.0 0.0
TOTAL 24 1,559.7 1.9 1,690.3 1.9 1,693.3 1.9 
2.1.6 For those savings approved prior to February 2022, there are four savings
categorised as having a shortfall and one currently delayed.   
Health and Social Care Partnership (HSCP) – Financial Update 
2.1.7 The forecast outturn position at the end of June is an estimated overspend of
£0.346m for 2022-23 (£0 for Social Work and £0.346m for Health).  The Chief
Financial Officer of the IJB is confident that the spend will be brought in line with
budget by the end of the financial year. 
2.2 Monitoring of Financial Risks 
2.2.1  This report outlines the process and approach developed in carrying out a financial
risks analysis and provides an update on the current assessment of financial risks.   
2.2.2 There are 6 Council wide revenue risks identified for 2022-23 currently amounting to
£3.537m.   
2.2.3 There are currently 42 departmental risks totalling £5.795m.  Of the 42 departmental
risks, one is categorised as almost certain and 5 are categorised as likely.  These
will continue to be monitored and action taken to mitigate or manage these risks.   
2.2.4 The top three risks in terms of the financial impact are noted in the table below. 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance -
Bridges, Culverts
& Sea Defences
Extreme localised weather may
result in loss of bridge, culvert ,
road or sea defence
3 750
Roads and
Infrastructure
Services
Residual Waste
H&L and Tiree
There is a potential increase to
tipping fees and haulage costs for
H&L residual waste.  The Council’s
supplier Barr Environmental
4 655
Page 8

Page 9

(contract to end of 2023) lost a
tribunal relating to the
underpayment of landfill tax, which
may have led to the Council having
to source alternatives at a higher
cost.    Barr appealed the decision
which was heard in the Spring and
they won the case which should
have reduced or eliminated this
financial risk.  However, the
Scottish Government laid an
Amendment Order on Friday 1 July
2022 which came into force at 1700
on 1 July which indicates that
Landfill tax will be due on materials
previously not chargeable and we
have now received notification of
an increase in the cost which
officers are currently assessing.
Financial
Services
Council Tax Debt
Collection
Recovery
Recovery of debt becomes more
difficult to pursue in the current
economic climate.  
5 500 
2.2.5 There have been four changes to the departmental risks since the report as
presented to the Policy and Resources Committee on 24 February 2022.  These are
outlined in paragraph 3.4.1 of the Financial Risks Report. 
2.3 Capital Plan Monitoring Report 
2.3.1 This report provides a summary of the current capital plan monitoring position. 
Information is provided in terms of monitoring year to date budget, current full year
budget, future years total budget and funding and non-financial in terms of project
performance. 
2.3.2 
2.3.3
At the budget setting meeting on 25 February 2021, the Council agreed to provide a
£2.5m provision for the increase in capital contract costs as a result of COVID-19
and following agreement at the Policy and Resources Committee on 14 October
2021, this, plus a further £0.146m, was added to the capital programme. At the
budget meeting in February 2022 an additional £3.9m was set aside for further
capital contract increases including up to £1.2m for Campbeltown Flood Scheme. 
There are likely to be further financial pressures facing the capital programme that
are not able to be quantified at this stage largely relating to inflationary increases in
the construction industry and supply chain issues. 
2.3.4 Actual net expenditure to date is £3.777m compared to a budget for the year to date
of £3.765m giving rise to an overspend for the year to date of £0.012m (0.3%). The
variance results from an accumulation of non-material variances across projects.
Page 9

Page 10

2.3.5 The forecast outturn for 2022-23 is a forecast net expenditure of £29.319m
compared to an annual budget of £48.555m giving rise to a forecast underspend for
the year of £19.236m (39.6%). 
2.3.6 The forecast total net projects costs on the capital plan are £177.521m compared to
a total budget for all projects of £176.387m giving rise to a forecast overspend for
the overall capital plan of £0.134m (0.08%).  
2.3.7 In respect of total project performance, there are 159 projects within the capital plan,
145 are complete or on target, 14 are off target and recoverable and no projects are
off track.  
2.4 Treasury Monitoring Report 
2.4.1 This report provides information on the current levels and recent transactions in
relation to the capital financing limit, total borrowing, temporary borrowing and long
term borrowing and investments.   
2.4.2 The net movement in external borrowing for the period 1 April 2022 to 30 June 2022
was a decrease of £10.861m. 
2.4.3 Borrowing is below the Capital Financing Requirement for the period to 30 June
2022.  At this stage in the financial year capital expenditure continues to be below
target. Due to delays as a result of the COVID-19 pandemic, capital expenditure has
been relatively low over the last twelve months. 
2.4.4 The levels of investments were £117.9m at 30 June 2022. The average rate of return
achieved was 1.351% which compares favourably with the SONIA (Sterling
Overnight Index Average) for the same period of 1.064%. 
2.5 Reserves and Balances 
2.5.1 This report summarises the overall level of reserves and balances and monitors the
spending of the earmarked reserves, providing detailed information on the unspent
budget earmarked balances.   
2.5.2 The Council has a total of £364.558m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
2.5.3 At 31 March 2022, the Council had a total of £103.626m of usable reserves.  Of this: 
• £2.682m relates to the Repairs and Renewals Fund
• £4.414m relates to Capital Funds
• £96.530m was held in the General Fund, with £89.433m of this balance
earmarked for specific purposes. 
2.5.4  Of the earmarked balance of £89.433m: 
• £46.923m is invested or committed for major initiatives/capital projects
• £37.089m is still to be drawn down in 2022-23
• £5.421m is planned to be spent in future years
Page 10

Page 11

2.5.5 The table below summarises the estimated Unallocated General Fund Balance as at
the end of the financial year: 
Heading Detail £000
Unallocated General Fund
as at 31 March 2022
This is the balance that is unallocated
over and above the 2% contingency,
which amounts to £5.256m
1,841
Budgeted allocation to
General Fund for 2022-23
Budget
Per the Budget Motion at Council on 24
February 22
2,482
Current Forecast Outturn
for 2022-23 as at 30 June
2022 
0
Estimated Unallocated
balance as at 31 March
2023 
4,323 
2.5.6  It can be seen that, after taking into consideration the Budget Motion and the current
forecast outturn for 2022-23, the Council is forecast to have a £4.323m surplus over
contingency. 
2.6 VIREMENTS OVER £0.200m (Revenue) 
2.6.1 Virement is the process of transferring budget between cost centres, services or
departments or between capital projects.  The Council’s constitution notes that
virements over £0.200m require approval by Council.  This section of the report will
be used to outline revenue virements in the period that require approval.   Capital
virements are included within the capital monitoring report. 
2.6.2 For the periods April to June 2022, there are no virements requiring authorisation.   
3.  RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee: 
a) Consider the revenue budget monitoring report as at 30 June 2022 
b) Note the financial risks for 2022-23 
c) Note the capital plan monitoring report as at 30 June 2022 and approve the
proposed changes to the capital plan outlined in Appendix 4 of that report. 
d) Note the treasury monitoring report as at 30 June 2022 
Page 11

Page 12

e) Consider the reserves and balances report as at 30 June 2022  
f) Note there are no revenue virements over £0.200m between April and June 2022 
4. IMPLICATIONS 
4.1 Policy – None.
4.2 Financial -  Outlines the revenue and capital monitoring for
2022-23 as at 30 June 2022.
4.3 Legal -  None.
4.4 HR -  None.
4.5 Fairer Scotland Duty -   None.
4.5.1 Equalities – protected
characteristics - 
None.
4.5.2 Socio-economic Duty -  None.
4.5.3 Islands -  None.
4.6 Climate Change - None.
4.7 Risk -  Risks are included in financial risks report. 
4.8 Customer Service -  None. 
Kirsty Flanagan
Section 95 Officer
8 July 2022 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk 
Page 12

Page 13

REVENUE BUDGET MONITORING REPORT AS AT 30 JUNE 2022 POLICY & RESOURCES COMMITTEE
12 AUGUST 2022 
2022-23 Overall Position:
There is no reported forecast under or overspend position for the Council at this time.  It is common for there to be no forecast variances
reported this early in the financial year. 
There is a year to date underspend of £1.087m.  The year to date variances within the departments tend to relate to the timing of income and
expenditure and recharging of costs to capital.  The system replacement and downtime has meant that budget profiles were unable to be
refined in the first quarter of the financial year so profiling issues are a common theme through the detailed reports which follow.   
Key Highlights as at June 2022:
•  The Oracle Fusion system implementation has impacted the year to date position noted for June 2022 as budget profiles were unable
to be refined in the first quarter of the financial year.  The implementation is progressing well and the issues with profiling will be
resolved by the next reporting period. 
Key Financial Successes:
Performance against budget for 2021-22 was an overall net favourable position of £1.630m underspend after adjusting for year-end
earmarking.  This breaks down as: 
• £0.815m net underspend in relation to Council service departmental expenditure
• £0.432m net overspend in relation to other central costs
• £1.247m over-recovery of Council Tax income.   
Key Financial Challenges: Proposed Actions to address Financial Challenges:
Ongoing consideration of the financial impact of COVID on the Council’s
revenue position. 
Continue to identify additional costs as a consequence of COVID to
ensure earmarked COVID funds are applied appropriately. 
Achieving a favourable year-end balanced position and achieving
savings targets in light of council wide risks to expenditure. 
Robust monitoring of the financial position and delivery of savings to
ensure budget issues inform the budget monitoring process.
Monitoring Social Work expenditure and more widely the IJB position as
any overspend will transfer back to partner bodies, in the first instance.  
Continue to work closely with the CFO of the IJB to ensure that early
indication of any potential adverse financial outturn is known and
corrective action is agreed as appropriate to reduce the risk to the
Council. 
Identifying further savings and delivering services more efficiently with
less resources, as whilst a balanced 2022-23 budget was agreed in
February 2022 there are still budget gaps in future years
The Council will continue to progress savings options identified in
2021-22 that require further development and seek to identify further
savings through themed reviews and business process reviews.
Page 13

Page 14

Maintaining or improving the level of service income recovered, for
example planning, building standards and car parking.  
Actively monitor income recovery and ensure Council fees and
charges policies are reviewed. 
Managing spend in service areas which are demand led and, to some
extent, outwith service control, for example Winter Maintenance. 
Use risk based approach to budget monitoring to focus additional
attention on these areas.
Ongoing requirement to fund unavoidable inflationary increases in areas
like utility costs, fuel, food etc. This is impacted further by the availability
of supply as a result of the COVID-19 pandemic, UK exit from the
European Union, invasion of Ukraine and sanctions on Russian owned
entities to name a few influencing factors.
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be reported through the budget monitoring
and preparation processes. 
Cost of living crisis impacting on pay inflation negotiations which could
result in pay awards above what is deemed affordable.
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be reported through the budget monitoring
and preparation processes. 
Forecast Outturn Position
There is no forecast projection for 2022-23 as at the end of June 2022.
Department
Annual
Budget   
£'000
Forecast
Outturn   
£'000
Current
Forecast
Variance
£'000
Previous
Forecast
Variance
£000
Change
£000 Explanation
Chief Executive's Unit 5,925 5,925 0 0 0
Executive Director (Douglas Hendry) 122,282 122,282 0 0 0
Executive Director (Kirsty Flanagan) 44,121 44,121 0 0 0
Social Work 72,911 72,911 0 0 0
Central Budgets 23,887 23,887 0 0 0
Financed By (269,126) (269,126) 0 0 0
Total 0 0 0 0 0
Current Forecast Outturn Variance with change from previous month
No forecast variances reported for any department as at June 2022
Page 14

Page 15

(2,000)
(500)
1,000
April
May
June
July
August
September
October
November
December
January
February
£ 000
Movement in the forecast outturn position for each Department from the start of the
financial year
Chief Executive's Unit Executive Director (Kirsty Flanagan)
Social Work Central Budgets
Executive Director (Douglas Hendry)
Underspend
Overspend
Page 15

Page 16

Year to Date Position
The year to date position as at the end of June 2022 is an underspend of £1.087m and the main variances are noted below. 
Department
YTD
Actual
£'000
YTD
Budget
£'000
YTD
Variance   
£'000
Explanation
Chief Executive's Unit 1,423 1,290 (133)
Executive Director (Douglas Hendry) 30,853 31,835 982
Executive Director (Kirsty Flanagan) 10,313 8,602 (1,711)
Social Work 14,629 17,447 2,818
Central Budgets 276 2,406 2,130
Funding (64,811) (67,810) (2,999)
Total Net Expenditure (7,317) (6,230) 1,087
The year to date variance is largely due to profiling of budgets as opposed to
genuine under or over spends. This will be rectified in the coming weeks once the
new financial ledger system is fully implemented
Page 16

Page 17

0%
25%
50%
75%
100%
Chief
Executive's
Unit
Executive
Director
(Kirsty
Flanagan)
Executive
Director
(Douglas
Hendry)
Social W
ork
Central
Budgets
TOTAL
Expenditure to date against the remaining budget for each
Department
YTD Actual Remaining Budget 
Further information on the departmental year to date variances is included later on in the report.  Page 17

Page 18

OBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 30 JUNE 2022
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual Budget Forecast
Outturn
Forecast
Variance
Variance
£'000 £'000 £'000 % £'000 £'000 £'000 %
Departmental Budgets
Chief Executive's Unit 1,423 1,290 (133) (10.3%) 5,925 5,925 0 0.0%
Executive Director (Kirsty Flanagan) 10,313 8,602 (1,711) (19.9%) 44,121 44,121 0 0.0%
Executive Director (Douglas Hendry) 30,853 31,835 982 3.1% 122,282 122,282 0 0.0%
Social Work 14,629 17,447 2,818 16.2% 72,911 72,911 0 0.0%
Total Departmental Budgets 57,218 59,174 1,956 3.3% 245,239 245,239 0 0.0%
Central Budgets
Other Operating Income and Expenditure (562) 431 993 230.4% 1,988 1,988 0 0.0%
Joint Boards 313 374 61 16.3% 1,496 1,496 0 0.0%
Non-Controllable Costs 525 1,601 1,076 67.2% 20,403 20,403 0 0.0%
Total Central Budgets 276 2,406 2,130 88.5% 23,887 23,887 0 0.0%
TOTAL NET EXPENDITURE 57,494 61,580 4,086 6.6% 269,126 269,126 0 0.0%
Financed By
Aggregate External Finance (53,856) (53,994) (138) 0.3% (216,346) (216,346) 0 0.0%
Local Tax Requirement (10,955) (13,816) (2,861) 20.7% (55,262) (55,262) 0 0.0%
Contributions to General Fund 0 0 0 0.0% 2,482 2,482 0 0.0%
Earmarked Reserves 0 0 0 0.0% 0 0 0 0.0%
Total Funding (64,811) (67,810) (2,999) 4.4% (269,126) (269,126) 0 0.0%
(Deficit)/Surplus for Period (7,317) (6,230) 1,087 0 0 0
CURRENT PROJECTED FINAL OUTTURNYEAR TO DATE POSITION
Page 18

Page 19

SUBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 30 JUNE 2022
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual
Budget
Forecast
Outturn
Forecast
Variance
Variance
£'000 £'000 £'000 % £'000 £'000 £'000 %
Subjective Category
Employee Expenses 35,945 37,580 1,635 4.4% 167,294 167,294 0 0.0%
Premises Related Expenditure 2,234 3,886 1,652 42.5% 16,491 16,491 0 0.0%
Supplies and Services 4,836 5,762 926 16.1% 20,950 20,950 0 0.0%
Transport Related Expenditure 2,881 2,916 35 1.2% 17,004 17,004 0 0.0%
Third Party Payments 29,753 40,835 11,082 27.1% 163,668 163,668 0 0.0%
Capital Financing (157) 0 157 14,289 14,289 0 0.0%
TOTAL EXPENDITURE 75,492 90,979 15,487 17.0% 399,696 399,696 0 0.0%
Income (82,810) (97,210) (14,400) 14.8% (399,696) (399,696) 0 0.0%
(Deficit)/Surplus for Period (7,317) (6,230) 1,087 0 0 0
YEAR TO DATE POSITION CURRENT PROJECTED FINAL OUTTURN
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget. 
Page 19

Page 20

CHIEF EXECUTIVE’S UNIT – AS AT 30 JUNE 2022 
The department is currently forecasting spend in line with budget. 
The department has a year to date overspend of £0.133m (10.3%) which can be attributed to profiling issues.   
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Chief Executive 894 894 0 0 0
Head of Financial Services 5,031 5,031 0 0 0
Totals 5,925 5,925 0 0 0
Year to Date Position 
0%
25%
50%
75%
100%
Chief Executive Head of Financial Services
Expenditure to date against the remaining budget for each
Service
YTD… Remaining Budget…
Key Financial Successes:
• The department is currently forecasting that spend will be in line with budget for 2022-23. 
• All savings options have been delivered.  
• The department’s 2021-22 outturn position was an underspend of £0.018m.  This resulted from an overall underspend of £2.013m
offset by earmarking of £1.769m due to auto-carry forwards including unspent grants and COVID-19 funding and £0.226m of unspent
budget earmarkings. 
Key Financial Challenges: Proposed Actions to address Financial Challenges:
To continue to deliver a high quality support service function during a time
of substantial uncertainty and challenge arising from continuing reductions
in funding whilst costs are increasing due to high inflation and service
Ensure the team is operating as efficiently and effectively as
possible to enable continued support to departments with reduced
resources by building resilience through knowledge sharing across
Page 20

Page 21

demand caused by world events including the COVID-19 pandemic and
the conflict in Ukraine.
the team and maximising the benefits to the service from the
implementation of the Oracle Fusion Financial Ledger System. 
Carry out a business process review of the Revenues and Benefits
function to determine if there is scope to deliver the service in a more
cost effective manner. 
Work collaboratively with other services of the Council to identify
opportunities to improve the operational and financial efficiency of
services and to support evidence based decision making.
Page 21

Page 22

CHIEF EXECUTIVE’S UNIT – OBJECTIVE SUMMARY AS AT 30 JUNE 2022 
Service Area YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Executive 65 68 3 4.4% 327 327 0 0.0% Outwith reporting criteria
Community Planning &
Development 158 124 (34) (27.4%) 567 567 0 0.0%
Profile related overspend on third party
payments partially offset by unbudgeted
income.  
223 192 (31) (16.2%) 894 894 0 0.0%  
Accounting &
Budgeting 580 468 (112) (23.9%) 2,138 2,138 0 0.0%
Overspend caused by profiling issues on
income budgets (will be rectified July) and
spend for which earmarkings require to be
drawn down
Internal Audit & Fraud 54 49 (5) (10.2%) 252 252 0 0.0%
Overspend caused by profiling issues on
income budgets (will be rectified July)
partially offset by underspend in staffing due
to vacancy
Revenues & Benefits (17) 447 464 103.8% 2,093 2,093 0 0.0%
Underspend from Housing Benefits Private
which is normally reprofiled to avoid large
variances due to the nature of the cost centre
- this was not possible in June due to the new
financial system implementation
Scottish Welfare Fund 583 134 (449) (335.1%) 548 548 0 0.0%
Profile related overspend on third party
payments and income accrued but not yet
received in  
1,200 1,098 (102) (9.3%) 5,031 5,031 0 0.0%    
1,423 1,290 (133) (10.3%) 5,925 5,925 0 0.0%   
Page 22

Page 23

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%. 
Page 23

Page 24

CHIEF EXECUTIVE’S UNIT – SUBJECTIVE SUMMARY AS AT 30 JUNE 2022
Subjective Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 1,057 1,071 14 1.3% 5,031 5,031 0 0.0% Outwith reporting criteria
Premises 0 0 0 0.0% 0 0 0 0.0% Outwith reporting criteria
Supplies and Services 145 140 (5) (3.6%) 579 579 0 0.0% Outwith reporting criteria
Transport 2 8 6 75.0% 32 32 0 0.0% Underspends on staff travel budgets
Third Party 4,637 6,241 1,604 25.7% 24,962 24,962 0 0.0% Profiling issues on Housing Benefits Private budget
Income (4,418) (6,170) (1,752) 28.4% (24,679) (24,679) 0 0.0% Profiling issues on Housing Benefits Private budget
Totals 1,423 1,290 (133) (10.3%) 5,925 5,925 0 0.0%
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 24

Page 25

CHIEF EXECUTIVE’S UNIT – RED VARIANCES AS AT 30 JUNE 2022 
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
0 0.0% 
A red variance is a forecast variance which is greater than +/- £50,000. 
Page 25

Page 26

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – AS AT 30 JUNE 2022 
The department is currently forecasting spend in line with budget.  It is common for there to be no forecast variances reported this early in the
financial year.
The department has a year to date (YTD) underspend of £0.982m (3.1%).  The year to date underspend position is mainly due to budget
profiling which will be refined through July 2022 once the new financial ledger system is fully functional.   
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Executive Director
(Douglas Hendry) (61) (61) 0 0 0
Head of Commercial
Services 9,645 9,645 0 0 0
Head of Education 93,648 93,648 0 0 0
Head of Legal and
Regulatory Support 19,050 19,050 0 0 0
Totals 122,282 122,282 0 0 0
Year to Date Position 
Key Financial Successes:
The 2021-22 year-end consolidated outturn position was an under spend of £0.223m after adjusting for earmarkings. This was due to the
effective contract management of NPDO and Hub Schools contracts, including a lower than expected insurance premium as a result of the
annual renegotiation of insurance costs. Also the costs of COVID were contained and minimised where possible across departments with staff
from all areas of the service assisting in planning, implementing and delivering a wide range of additional services in schools and communities
and helping businesses through the return from lockdown. 
0%
25%
50%
75%
100%
Executive Director
(Douglas Hendry)
Head of
Commercial
Services
Head of Education Head of Legal and
Regulatory Support
Expenditure to date against the remaining budget for each
Service
YTD… Remaining Budget…
Page 26

Page 27

Key Financial Challenges: Proposed Actions to address Financial Challenges:
The ongoing impact of COVID-19 Costs are being contained where possible. 
Impact of numbers/uptake in demand led service areas like catering,
design services and licensing.
Continually refine/develop systems to accurately calculate forecast
outturns and the impact on the future financial outlook.
Manage the impact of the Statutory Guidance supporting Nutritional
Requirements for Food and Drink in Schools (Scotland) Regulations
2020, on the cost of producing school meals and also the uptake.
Monitor and report on the impact on costs and on income as the
year progresses.
Support longer term service re-design project for Catering and Cleaning
services to ensure efficiencies and financial savings are secured for the
Council as well as delivery of free school meals for 1140 hours of Early
Learning and Childcare and the phased universal free school meals
expansion in Primary Schools. 
Effective working with partners and support with implementation of
service delivery method. Continual monitoring and review of
budgets.
Legislative/policy requirements not fully funded by Scottish Government
which may put additional burdens on the Council. For example, the
introduction of free school meal payments for holidays.
Analysis of new obligations and whether they incur additional costs
not met through increased grant.
The Council has a requirement to deliver 1140 hours of Early Learning
and Childcare. The initial funding from Scottish Government was based
on individual implementation plans with funding confirmed up to March
2022. The ring fenced grant has been reduced in 2022-23 and an
exercise is required to ensure that the service can be delivered efficiently
and effectively within this reduced funding allocation.
Robust service costings, financial monitoring and timely reporting
to ensure the service can continue to deliver the service within the
financial resources available. 
Impact of high inflationary uplifts within the NPDO/HUB School contracts. Ensuring continued effective contract management of NPDO/HUB
Schools to minimise the impact of high inflationary uplifts. 
Page 27

Page 28

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – OBJECTIVE SUMMARY AS AT 30 JUNE 2022
Service Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director
(Douglas
Hendry)
Central/Management
Costs 70 69 (1) (1.5%) (61) (61) 0 0.0% Outwith Reporting Criteria    
70 69 (1) (1.5%) (61) (61) 0 0.0%  
Head of
Commercial
Services
Catering (58) 125 183 146.4% 1,110 1,110 0 0.0%
The YTD underspend of £183k
is due to the profiling of the
catering purchases budget, this
will be refined through July. 
Head of
Commercial
Services
Central/Management
Costs 230 207 (23) (11.1%) 950 950 0 0.0%
The YTD overspend of £23k is
due to profiling of Our Modern
Workspace budget which will be
refined through July. 
Head of
Commercial
Services
CHORD 47 (5) (52) 1040.0% 20 20 0 0.0%
The YTD overspend of £52k is
due to the profiling of Income
which will be refined through
July.
Head of
Commercial
Services
Cleaning (43) 31 74 238.7% 417 417 0 0.0%
The YTD underspend of £74k is
due to the profiling of staffing
budgets which will be rectified in
July.
Head of
Commercial
Services
Culture, Heritage,
Recreation & Sport 1,420 1,459 39 2.7% 5,812 5,812 0 0.0% Outwith Reporting Criteria
Page 28

Page 29

Head of
Commercial
Services
Events &
Commercial
Catering
41 (15) (56) 373.3% (22) (22) 0 0.0%
The YTD overspend of £56k is
partially due to an under
recovery of income from events
and profiling which will be
refined through July.
Head of
Commercial
Services
Property Portfolio (93) (49) 44 (89.8%) (194) (194) 0 0.0%
The YTD underspend of £44k is
due to the profiling of rental
income and surplus property
budgets.  These will be refined
through July.
Head of
Commercial
Services
Property Services 495 61 (434) (711.5%) 500 500 0 0.0%
The YTD overspend of £434k is
due to the profiling of internal
property fees, this profile will be
rectified in July.
Head of
Commercial
Services
Shared Offices 204 325 121 37.2% 1,052 1,052 0 0.0%
The YTD underspend is due to
the timing of the central repairs
invoicing and utilities profiling,
both of which will be rectified
through July.    
2,243 2,139 (104) (4.9%) 9,645 9,645 0 0.0%  
Head of
Education
Additional Support
for Learning 2,099 2,342 243 10.4% 9,874 9,874 0 0.0%
The YTD underspend of £243k
is due to profiling of staffing
budgets and third party payment
budgets.  All will be refined
through July.
Head of
Education
Central/Management
Costs 434 437 3 0.7% 1,476 1,476 0 0.0% Outwith Reporting Criteria
Head of
Education
Community Learning
& Development (7) 2 9 450.0% 10 10 0 0.0%
The YTD underspend of £9k is
profile related and will be
rectified in July.
Page 29

Page 30

Head of
Education COVID 242 0 (242) 0.0% 414 414 0 0.0%
The YTD overspend of £242k is
mainly due to the profiling of
Covid Hardship Funding
payments which will be rectified
in July.
Head of
Education
Early Learning &
Childcare 3,182 4,606 1,424 30.9% 8,324 8,324 0 0.0%
The YTD underspend of
£1.424m is due to profiling of
Employee, Third Party
Payments and Income Budgets.
Some alignment of staffing
budgets is also required.   
Head of
Education Primary Education 8,458 8,261 (197) (2.4%) 34,433 34,433 0 0.0%
The YTD overspend of £197k is
due to profiling issues with
Employee Budgets and Catering
Income budgets.  All will be
refined through July. There are
also a number of budget
adjustments required to align
covid funding to current spend
that will be processed in July.
Head of
Education Pupil Support 448 536 88 16.4% 2,169 2,169 0 0.0%
The YTD underspend is due to
profiling issues with Employee
budgets, Third Party Payment
Budgets and Government
Grants.  All will be refined
through July.
Head of
Education
Schools - Central
Services 544 625 81 13.0% 2,665 2,665 0 0.0%
The YTD underspend of £81k is
mainly due to profiling of
Employee, Supplies and
Services and Income Budgets
which will be refined through
July. There is an overspend of
£15k in Education Licenses and
budget will require to be
identified from within the service
to fund this overspend.
Page 30

Page 31

Head of
Education
Secondary
Education 6,910 7,944 1,034 13.0% 34,283 34,283 0 0.0%
The YTD underspend of
£1.034m is mainly due to
profiling issues with Employee
Expenses and Income budgets
which will be refined through
July. £439k of this underspend
is accrued expenditure for SQA
Exam Fees that will be
eliminated when the invoice is
received and paid. There are
also a number of budget
adjustments required to align
Covid funding to current spend
that will be processed in July. 
22,310 24,753 2,443 9.9% 93,648 93,648 0 0.0%  
Head of
Legal &
Regulatory
Support
Central/Management
Costs 49 55 6 10.9% 258 258 0 0.0%
The YTD underspend of £6k is
due to profiling issues that will
be refined through July.
Head of
Legal &
Regulatory
Support
Community Safety 39 35 (4) (11.4%) 161 161 0 0.0%
The YTD overspend of £4k is
due to profiling issues that will
be rectified through July.
Head of
Legal &
Regulatory
Support
Elections 65 95 30 31.6% 386 386 0 0.0%
The YTD underspend of £30k is
due to profiling issues that will
be rectified through July.
Head of
Legal &
Regulatory
Support
Governance 163 169 6 3.6% 784 784 0 0.0% Outwith Reporting Criteria
Head of
Legal &
Regulatory
Support
Governance, Risk &
Safety 109 115 6 5.2% 542 542 0 0.0% Outwith Reporting Criteria
Page 31

Page 32

Head of
Legal &
Regulatory
Support
Legal Services 150 131 (19) (14.5%) 677 677 0 0.0%
The YTD overspend of £19k is
due to profiling of Employee and
Income Budgets which will be
rectified through July.
Head of
Legal &
Regulatory
Support
NPDO and Hub
Schools 5,171 3,910 (1,261) (32.3%) 14,512 14,512 0 0.0%
The YTD overspend of £1.261m
is due to the profiling of Income
Budgets and will be rectified
through July.
Head of
Legal &
Regulatory
Support
Procurement,
Commisioning and
Contracts
212 238 26 10.9% 1,132 1,132 0 0.0%
The YTD underspend of £26k is
partly due to staff vacancies and
also profiling of Employee
Budgets which will be refined
through July.
Head of
Legal &
Regulatory
Support
Trading Standards &
Advice Services 272 126 (146) (115.9%) 598 598 0 0.0%
The YTD overspend is mainly
due to payments being made to
advice services that will be
rectified by drawing down funds
held in earmarked reserves.    
6,230 4,874 (1,356) (27.8%) 19,050 19,050 0 0.0%      
30,853 31,835 982 3.1% 122,282 122,282 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.  
Page 32

Page 33

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – SUBJECTIVE SUMMARY AS AT 30 JUNE 2022
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 20,877 21,793 916 4.2% 93,452 93,452 0 0.0%
Non-Education: YTD underspend of £137k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Education: YTD underspend of £779k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Premises 1,487 1,683 196 11.7% 7,207 7,207 0 0.0%
Non-Education: YTD underspend of £146k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Education: YTD underspend of £50k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Supplies and
Services 2,396 2,919 523 17.9% 10,276 10,276 0 0.0%
Non-Education: YTD underspend of £299k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Education: YTD underspend of £223k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Transport 73 64 (9) (14.1%) 256 256 0 0.0%
Non-Education: YTD underspend of £6k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Education: YTD overspend of £15k due to profiling, budget required to be profiled across department
in line with anticipated spend and will be rectified in July.
Third Party 7,904 10,154 2,250 22.2% 39,250 39,250 0 0.0%
Non-Education: YTD underspend of £120k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Education: YTD underspend of £2.129m due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July. Also £439k accrued expenditure
for SQA Exams which will be eliminated when invoice received from SQA.
Income (1,884) (4,778) (2,894) 60.6% (28,159) (28,159) 0 0.0%
Non-Education: YTD overspend of £2.171m due to profiling, budget required to be profiled across
department in line with anticipated receipt of income and will be rectified in July.
Education: YTD underspend of £0.722m due to profiling, budget required to be profiled across
department in line with anticipated receipt of income and will be rectified in July.
Totals 30,853 31,835 982 3.1% 122,282 122,282 0 0.0%
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 33

Page 34

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – RED VARIANCES AS AT 30 JUNE 2022 
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
A Red variance is a forecast variance which is greater than +/- £50,000. 
Page 34

Page 35

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – AS AT 30 JUNE 2022 
The department is currently forecasting spend in line with budget.  It is common for there to be no forecast variances reported this early in the
financial year.   
The department has a year to date overspend of £1.711m (19.9%).  This is mainly due to profiling adjustments which will be refined through
July 2022 once the new financial ledger system is fully functional. These profiling adjustments largely relate to income budgets within Roads
and Marine services.  
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Executive Director (Kirsty
Flanagan) (270) (270) 0 0 0
Head of Customer Support
Services 8,152 8,152 0 0 0
Head of Development and
Economic Growth 7,710 7,710 0 0 0
Head of Roads and
Infrastructure Services 28,529 28,529 0 0 0
Totals 44,121 44,121 0 0 0
Year to Date Position 
Key Financial Successes:
At the end of financial year 2021-22 the department showed an overall underspend of £0.574m after taking into account all earmarkings. The
main underspends were due to the over-recovery of vacancy savings, additional income in Environmental Health from Private Water Supply
Appraisals and additional Planning Fee income which was partially offset by the under-recovery of Building Warrant income. Overall there was
a favourable net position. 
-95%
-70%
-45%
-20%
5%
30%
55%
80%
105%
Executive Director
(Kirsty Flanagan)
Head of Customer
Support Services
Head of
Development and
Economic Growth
Head of Roads and
Infrastructure
Services
Expenditure to date against the remaining budget for each
Service
YTD… Remaining Budget…
Page 35

Page 36

Key Financial Challenges: Proposed Actions to address Financial Challenges:
The impact of COVID-19 Costs are being contained where possible. 
Department / Service ongoing ability to meet future savings / efficiency
requirements.
Monitoring of trends / expenditure levels / service configuration and
the Service Packages Policy Options savings process.
Dangerous buildings as there is no budget for this expenditure and the
council has no control over the demand for the service.   
Building Standards, Legal Services and Financial Services are
working closely to manage debt recovery and to consider other
options to minimise corporate risk exposure.  
Due to the nature of the various components of Waste Management there
are ongoing challenges with:
• The introduction of the Deposit Return Scheme
• Uncertainty with recycling income/ gate fee costs due to the           
volatility of the market
• Challenges in the legislative changes around the disposal of      
Biodegradable Municipal Waste 
To closely monitor all service components of Waste Management
and review the Waste Strategy in conjunction with our contractual
partner Renewi (previously Shanks).
Winter Maintenance costs are difficult to estimate as they are very much
dependant on the weather.  
Close monitoring of Winter Maintenance and reporting of the
financial implications through the budget monitoring process. The
Council agreed the winter policy, setting out the intervention level
and locations to be treated.  The number of treatments is determined
by weather conditions. The current budget provision provides for 58
full equivalent runs. There is a sophisticated weather monitoring
system in place consisting of several weather stations, this is
supported by a forecasting and metrological service which is
collaboratively procured by West of Scotland local authorities.
Rising cost of materials across the service will result in a reduction in
activity or overspends. Specifically there have been significant increases
in the price of salt and bitumen in recent months.
Costs are monitored regularly and contained as much as possible,
with any unavoidable overspends highlighted as soon as known. 
Page 36

Page 37

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 30 JUNE 2022
Service
Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director (Kirsty
Flanagan)
Central/Management
Costs 52 53 1 1.9% (270) (270) 0 0.0% Outwith Reporting Criteria    
52 53 1 1.9% (270) (270) 0 0.0%  
Head of
Customer
Support
Services
Central/Management
Costs 29 36 7 19.4% 166 166 0 0.0%
Profile of budget in payments to
other bodies needs to be profiled
in line with planned expenditure
timings.
Head of
Customer
Support
Services
Communications 18 65 47 72.3% 306 306 0 0.0%
Bord na Gaidhlig income
received in advance of
expenditure.
Head of
Customer
Support
Services
Customer Service
Centres 268 294 26 8.8% 1,321 1,321 0 0.0% Outwith Reporting Criteria
Head of
Customer
Support
Services
HR 418 485 67 13.8% 2,287 2,287 0 0.0%
Vacancies in Performance
Management - vacancy savings
not yet processed.
Head of
Customer
Support
Services
ICT 584 882 298 33.8% 3,994 3,994 0 0.0%
Profile of budgets in supplies and
services needs to be profiled in
line with planned expenditure
timings.
Head of
Customer
Support
Services
Registrars (37) 3 40 1333.3% 78 78 0 0.0%
Vacancy savings have not yet
been taken and income profile
needs to be adjusted.    
1,280 1,765 485 27.5% 8,152 8,152 0 0.0%  
Head of
Development &
Economic
Growth
Airports 330 268 (62) (23.1%) 1,163 1,163 0 0.0%
Private contractor budget needs
to be profiled in line with
anticipated expenditure.
Head of
Development &
Economic
Growth
Building Control (103) 1 104 10400.0% (108) (108) 0 0.0%
Income currently ahead of
budget profile which will be
closely monitored over the
coming months.
Head of
Development &
Central/Management
Costs 96 122 26 21.3% 574 574 0 0.0% Budget profile needs to be
amended.
Page 37

Page 38

Economic
Growth
Head of
Development &
Economic
Growth
Culture & Heritage 17 49 32 65.3% 216 216 0 0.0%
Budget for Rothesay Pavilion not
currently needed - will be profiled
for future monitoring.
Head of
Development &
Economic
Growth
Development
Management (137) 3 140 4666.7% 238 238 0 0.0% Planning Fee income currently
ahead of profile.
Head of
Development &
Economic
Growth
Development Policy 72 80 8 10.0% 379 379 0 0.0%
Subscription budgets need to be
profiled in line with anticipated
expenditure.
Head of
Development &
Economic
Growth
Economic
Development (209) 272 481 176.8% 1,038 1,038 0 0.0%
Income for Islands Infrastructure
Fund received in advance of
payments.
Head of
Development &
Economic
Growth
Environmental
Health 187 233 46 19.7% 1,284 1,284 0 0.0%
Income for Private Water Supply
Appraisal currently ahead of
budget profile which will be
closely monitored over the
coming months.
Head of
Development &
Economic
Growth
Environmental
Initiatives 44 24 (20) (83.3%) 114 114 0 0.0% Profile of third party payment.
Head of
Development &
Economic
Growth
Housing 1,397 951 (446) (46.9%) 2,593 2,593 0 0.0%
Expenditure payments for
HEEPS incurred prior to grant
income being received.
Head of
Development &
Economic
Growth
Transportation
Policy 13 49 36 73.5% 219 219 0 0.0% CWSS income received in
advance of expenditure.    
1,707 2,052 345 16.8% 7,710 7,710 0 0.0%  
Head of Roads
& Infrastructure
Services
Amenity 802 684 (118) (17.3%) 2,792 2,792 0 0.0%
Income budget requires to be
profiled in line with anticipated
income timings.
Head of Roads
& Infrastructure
Services
Car Parking (98) (166) (68) 41.0% (619) (619) 0 0.0%
Income budget requires to be
profiled in line with anticipated
income timings.
Page 38

Page 39

Head of Roads
& Infrastructure
Services
Central/Management
Costs 652 635 (17) (2.7%) 2,896 2,896 0 0.0% Outwith Reporting Criteria
Head of Roads
& Infrastructure
Services
Depots 94 (91) (185) 203.3% (469) (469) 0 0.0%
Income budget requires to be
profiled in line with anticipated
income timings.
Head of Roads
& Infrastructure
Services
Fleet & Transport 2,191 727 (1,464) (201.4%) 8,260 8,260 0 0.0%
Income budget requires to be
profiled in line with anticipated
income timings.
Head of Roads
& Infrastructure
Services
Infrastructure 85 142 57 40.1% 720 720 0 0.0%
Coastal and Flood budget
requires to be profiled in line with
anticipated expenditure.
Head of Roads
& Infrastructure
Services
Marine (293) (1,515) (1,222) 80.7% (4,371) (4,371) 0 0.0%
Income behind budget profile -
profile will be amended and
income levels closely monitored.
Head of Roads
& Infrastructure
Services
Network & Traffic
Management 55 25 (30) (120.0%) 166 166 0 0.0%
Income behind budget profile -
profile will be amended and
income levels closely monitored.
Head of Roads
& Infrastructure
Services
Road Safety 20 38 18 47.4% 178 178 0 0.0% Vacancy savings not yet been
taken.
Head of Roads
& Infrastructure
Services
Roads & Lighting 2,702 1,282 (1,420) (110.8%) 6,143 6,143 0 0.0%
Income budget requires to be
profiled in line with anticipated
income timings.
Head of Roads
& Infrastructure
Services
Waste 1,064 2,971 1,907 64.2% 12,833 12,833 0 0.0%
Income ahead of budget profile -
profile will be looked and income
levels monitored closely.    
7,274 4,732 (2,542) (53.7%) 28,529 28,529 0 0.0%      
10,313 8,602 (1,711) (19.9%) 44,121 44,121 0 0.00%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%. 
Page 39

Page 40

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – SUBJECTIVE SUMMARY AS AT 30 JUNE 2022 
Subjective Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 7,084 7,560 476 6.3% 35,352 35,352 0 0.0%
Vacancy savings have not yet been taken for vacant posts
throughout the department.  Budget for overtime needs to be
profiled in line with anticipated expenditure i.e. winter months.
Premises 575 746 171 22.9% 2,990 2,990 0 0.0%
Depot recharge budget needs profiled in line with anticipated
expenditure and current underspend in CRA budgets across the
department.
Supplies and Services 1,772 1,990 218 11.0% 8,061 8,061 0 0.0% Profile of budgets in ICT needs to be profiled in line with
planned expenditure timings.
Transport 2,679 2,676 (3) (0.1%) 15,837 15,837 0 0.0% Outwith Reporting Criteria.
Third Party 6,817 8,533 1,716 20.1% 35,828 35,828 0 0.0%
Budget requires to be profiled in Waste and Roads and Lighting
Holding Account, and across the department, in line with
anticipated expenditure timings.
Capital Financing 0 0 0 0.0% 1,591 1,591 0 0.0% Outwith Reporting Criteria.
Income (8,614) (12,903) (4,289) 33.2% (55,538) (55,538) 0 0.0%
Budget for Roads Operational Holding Accounts needs profiled
in line with anticipated income timings (£2,239k).  Accruals for
HEEPS income still outstanding (£705k).  Public transport
income needs profiled in line with anticipated income timings
(£1,285k)
Totals 10,313 8,602 (1,711) (19.9%) 44,121 44,121 0 0.0% 
Page 40

Page 41

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 41

Page 42

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – RED VARIANCES AS AT 30 JUNE 2022
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation             
A red variance is a forecast variance which is greater than +/- £50,000.
Page 42

Page 43

SOCIAL WORK – AS AT 30 JUNE 2022 
The department is currently forecasting spend in line with budget. 
The department has a year to date underspend of £2.818m (16.2%). This is mainly due to a large number of budget profile adjustments across
Social Work that will be refined through July 2022 once the new financial ledger system is fully functional. 
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Chief Officer Integration 1,982 1,982 0 0 0
Head of Adult Services 55,089 55,089 0 0 0
Head of Children and Families 15,387 15,387 0 0 0
Head of Strategic Planning and
Performance 453 453 0 0 0
Totals 72,911 72,911 0 0 0
Year to Date Position 
0%
25%
50%
75%
100%
Chief Officer
Integration
Head of Adult
Services
Head of Children
and Families
Head of
Strategic
Planning and
Performance
Expenditure to date against the remaining budget
for each Service
YTD… Remaining Budget…
Key Financial Successes:
Delivered an underspend at the end of 2021/22 after automatic earmarkings and full repayment of £2.759m of debt owed to the Council for
prior year deficits. This should allow for future investment and transformation across Social Work with prior year deficits now fully repaid. 
Page 43

Page 44

Key Financial Challenges: Proposed Actions to address Financial Challenges:
Deliver the outstanding savings total for 2022/23 of £966k (as at June
2022).
Maintain a close working relationship with the HSCP Service
Improvement Team in order to quickly and efficiently identify and
assess options for delivering the outstanding savings.
Development and delivery of future service redesigns which will be
necessary to contain service expenditure within the allocated resource in
the medium to long term.
Support from finance to assist strategic managers to look beyond
the short term to identify and plan the changes which will be needed
to address the expected ongoing budget challenge over the next 3
to 5 years.
Support the HSCP through recovery from the COVID-19 pandemic. There
have been additional costs and pressures across the HSCP as a direct
result of the partnership’s response to COVID-19. These costs are
captured and reported to the Scottish Government via Mobilisation Plans.
Support from finance to assist the service in capturing details of all
additional costs associated with the response to COVID-19 to
ensure these are included in Scottish Government funding returns. 
Page 44

Page 45

SOCIAL WORK – OBJECTIVE SUMMARY AS AT 30 JUNE 2022
Service Service
Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Officer
Integration
Integration
Headquarters 53 98 45 45.9% 446 446 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
other bodies and audit fees. This
needs to be adjusted in line with
planned expenditure.  
Chief Officer
Integration
Social Work
Central
Support
(208) 682 890 130.5% 1,536 1,536 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
other bodies. This needs to be
adjusted in line with planned
expenditure.      
(155) 780 935 2 1,982 1,982 0 0  
Head of
Strategic
Planning &
Performance
Management
& Central
Costs
206 88 (118) (134.1%) 421 421 0 0.0%
The YTD variance is as a result of
an invoice being miscoded. This will
be adjusted in July. 
Head of
Strategic
Planning &
Performance
Service
Development 12 5 (7) (140.0%) 32 32 0 0.0%
The YTD variance is as a result of
budget profiling for income receipt.
This needs to be adjusted in line
with anticipated receipt.      
218 93 (125) (3) 453 453 0 0  
Head of Adult
Care - Older
Adults &
Community
Hospitals
Management
& Central
Costs
133 103 (30) (29.1%) 257 257 0 0.0%
The YTD variance is as a result of
budget profiling for income receipt.
This needs to be adjusted in line
with anticipated receipt.  
Page 45

Page 46

Head of Adult
Care - Older
Adults &
Community
Hospitals
Older People 6,904 8,708 1,804 20.7% 37,163 37,163 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
third parties, which includes
additional funding received from
Scottish Government this financial
year. This needs to be profiled in
line with planned expenditure. 
7,037 8,811 1,774 20.1% 37,420 37,420 0 0.0%  
Head of Adult
Care - LD, Mh &
Life Long
Conditions
Learning
Disabilities 3,275 3,072 (203) (6.6%) 12,302 12,302 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
third parties and income. This
needs to be adjusted in line with
planned expenditure and
anticipated income receipt. 
Head of Adult
Care - LD, Mh &
Life Long
Conditions
Management
& Central
Costs
23 29 6 20.7% 128 128 0 0.0%
The YTD variance is as a result of
underspends on staffing costs (not
yet taken towards vacancy savings
target) combined with small
underspends across supplies and
services as a result of budget
profiling. This needs adjusted in line
with planned expenditure.
Head of Adult
Care - LD, Mh &
Life Long
Conditions
Mental
Health 573 562 (11) (2.0%) 2,499 2,499 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
third parties and income. This
needs to be adjusted in line with
planned expenditure and
anticipated income receipt. 
Head of Adult
Care - LD, Mh &
Life Long
Conditions
Physical
Disability 854 676 (178) (26.3%) 2,740 2,740 0 0.0%
The YTD variance is as a result of
budget profiling for income receipt.
This needs to be adjusted in line
with anticipated receipt.      
4,725 4,339 (386) (0) 17,669 17,669 0 0  
Page 46

Page 47

Head of
Children &
Families
Child
Protection 561 728 167 22.9% 3,401 3,401 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
other bodies. This needs to be
adjusted in line with planned
expenditure. This is combined with
underspends as a result of staffing
vacancies which have not yet been
transferred to vacancy savings. 
Head of
Children &
Families
Children with
a Disability 142 221 79 35.8% 911 911 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
other bodies. This needs to be
adjusted in line with planned
expenditure.  
Head of
Children &
Families
Criminal
Justice 48 (28) (76) 271.4% 85 85 0 0.0%
The YTD variance is as a result of
budget profiling for income receipt.
Scottish Government grant income
has been received slower than
anticipated.  
Head of
Children &
Families
Looked After
Children 1,490 1,802 312 17.3% 7,713 7,713 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
other bodies. This needs to be
adjusted in line with planned
expenditure.  
Head of
Children &
Families
Management
& Central
Costs
563 701 138 19.7% 3,277 3,277 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
third parties and rental costs. This
needs to be adjusted in line with
planned expenditure. This is
combined with underspends as a
result of staffing vacancies which
have not yet been transferred to
vacancy savings.      
2,804 3,424 620 18.1% 15,387 15,387 0 0.0%  
GRAND
TOTAL   14,629 17,447 2,818 16.2% 72,911 72,911 0 0.0%   
Page 47

Page 48

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.  
Page 48

Page 49

SOCIAL WORK – SUBJECTIVE SUMMARY AS AT 30 JUNE 2022 
Subjective Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 6,258 6,553 295 4.5% 30,295 30,295 0 0.0%
The YTD underspend is mainly due to LD Resource/Day Centres (as posts
have been kept vacant to declare linked budget saving) combined with
Children & Families Area Teams and Adult Services Assessment & Care
Management Teams. These underspends will be used to declare budget
savings or be taken towards the vacancy savings target in the forthcoming
months. This is partially offset by YTD overspends in Homecare due to the
use of agency staff. 
Premises 208 286 78 27.3% 1,149 1,149 0 0.0%
The YTD underspend is due to profiling. This needs to be adjusted in line
with planned expenditure.
Supplies & Services 457 440 (17) (3.9%) 803 803 0 0.0%
The YTD underspend is due to profiling. This needs to be adjusted in line
with planned expenditure.
Transport 122 159 37 23.3% 628 628 0 0.0%
The YTD underspend is due to profiling combined with on-going reduction
in travel costs as a consequence of Covid-19.
Third Party 9,934 15,387 5,453 35.4% 61,548 61,548 0 0.0%
The YTD underspend is due to profiling. This needs to be adjusted in line
with planned expenditure.
Income (2,350) (5,378) (3,028) 56.3% (21,512) (21,512) 0 0.0%
The YTD underspend is due to profiling. This needs to be adjusted in line
with anticipated income receipt.
Totals 14,629 17,447 2,818 16.2% 72,911 72,911 0 0.0% 
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 49

Page 50

SOCIAL WORK – RED VARIANCES AS AT 30 JUNE 2022
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
A red variance is a forecast variance which is greater than +/- £50,000.
Page 50

Page 51

MONITORING OF SAVINGS – AS AT 30 JUNE 2022
New policy savings were identified for the three year period 2022-23 to 2024-25 and these were agreed by Council in February 2022. 
Council agreed to policy savings of £0.280m in 2022-23 rising to £0.286m by 2024-25. 
The position of historical policy saving options is as follows:
- 2021/22 – those not delivered or that have further increase in value in 2022-23 onwards total £0.732m
- 2020/21 – those not delivered total £0.050m
- 2019/20 – all delivered
- 2018/19 - those not delivered total £0.498m
The 2022-23 savings have been removed from departmental budgets, however, it is important to monitor whether the saving has
actually been delivered to ensure that costs are not continuing resulting in an overspend by the end of the year.  It is also important
to ensure that any preparatory work required to deliver savings in future years is on track. 
There are four savings categorised as having a potential shortfall and one currently delayed as summarised below:
Saving Saving
Agreed
Status Detail Shortfall/
Delayed
Value
TB07 – Depots  Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
Create one main depot in key areas to reduce costs – it has become
apparent that the operating costs of the single redeveloped site in
each town will increase, reducing the anticipated saving. COVID-19
has also had a detrimental effect on this savings option as
construction works were halted at the site in Oban.  The Oban site
has now all but completed and a saving will be realised against the
operating budget of the vacated depot site, which will partially cover
some of the required saving.
£107,500
TB13b Roads and
Amenity Services
charging (non-
statutory services)
Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
The original proposal was to introduce charges for providing lighting
design and increase charges by 20% for road construction consents,
skips, scaffolds, hoarding, permits and licences. Whilst some
additional income has been generated through third party works,
there have been limited opportunities over the last 2 years and
opportunities are expected to be limited over the foreseeable future.
£100,000
Page 51

Page 52

TB12b Stadiums Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
Due to COVID, discussions have stalled with partners in the Oban
and Lorn area with regard to Mossfield stadium, to create a sports
Hub, attract external funding to improve facilities and therefore attract
additional events to the arena.  Once restrictions are eased, the
users group will reconvene and report to the steering group.
£20,000
DEG05 – Building
Standards
Feb-20 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
Delay in achieving target due to the impact of COVID-19 on the
building industry and the number of warrants being granted.  This is
now exacerbated by the building market which has slowed due to the
increase in cost and availability of some materials.
£50,000
TB09 – Public
Conveniences
Feb-18 Delayed - The full
saving will not be
achieved in line with
the original estimated
timescale.  
Installation of door entry systems have seen delays due to COVID
and a lack of available suppliers operating at the time.  Tender
returns have been received significantly over the available budget
and work is underway to profile different options to take this scheme
forward in whole or in part.  
£24,000 
All policy saving options previously agreed are noted in the table below for information.  Page 52

Page 53

2022-23 2022-23
£000 FTE
Chief Executive's Unit
FS02 Feb-22 Financial
Services
Reduction of vacant 0.4FTE Local Tax
Assistant role
10.0 0.40 Delivered
Executive Director Douglas Hendry
PROP01 Feb-21 Commercial
Services
Rationalisation of the Council's property
estate over a three year programme to
identify properties which can either be
disposed of or used to generate
commercial income
294.20 4.0 Still to be Implemented
TB17 Feb-18 Commercial
Services
Identify opportunities for office
rationalisation and raising income
121.50 0.0 On Track to be Delivered
CS01 Feb-22 Commercial
Services
Climate Change & Resource Efficiency 63.0 0.00 On Track to be Delivered
CS03 Feb-22 Commercial
Services
Stretch Targets for One Council Income &
Events
20.0 0.00 On Track to be Delivered
ED5 Feb-21 Education Review and reduce Clerical Support
Entitlement using updated school rolls.
121.00 5.7 Delivered
ED01 Feb-22 Education Removal of Community Learning
Development Manager Post
66.5 1.00 Delivered
Executive Director Kirsty Flanagan
CSS03 Feb-22 Customer
Support
Services
Restructure of CSP/Registration Team at
Helensburgh Civic Centre
19.0 0.50 On Track to be Delivered
DEG01 Feb-22 Development
and Economic
Growth
Crown Estate Administration Contribution
to Project Delivery
101.0 0.00 On Track to be Delivered
DEG05(a) Feb-20 Development
and Economic
Growth
Raise additional fees by adopting the
current Building Cost Information Service
(BCIS) guide for the cost of building work.
Regular service users have been
informed of this change.
50.00 0.0 Potential Shortfall
DEG02 Feb-21 Development
and Economic
Growth
Reduction to overtime budget in the
provision of fire cover at the airports for
weather delayed flights.  Arrangements
are in place that staff no longer remain at
the airport and there is a cut-off period.
22.00 0.0 On Track to be Delivered
DEG07 Feb-21 Development
and Economic
Growth
Additional income through fees and
charges for s64 Non-Material Amendment
Submissions, non e-planning application
submissions and property history
searches
20.00 0.0 Delivered
DEG10 Feb-21 Development
and Economic
Growth
Maximise income through additional
private water supplies income from risk
assessments of supplies  and introducing
a new charge for the provision of shellfish
movement documents
17.50 0.0 Delivered
TB07 Feb-18 Roads and
Infrastructure
Services
Create one main depot in key areas to
reduce costs
172.50 0.0 Potential Shortfall
TB13b Feb-18 Roads and
Infrastructure
Services
Roads & Amenity Services charging (non-
statutory services)
150.00 0.00 Potential Shortfall
R&I17 Feb-21 Roads and
Infrastructure
Services
Public transport fare scale increase 76.00 0.0 On Track to be Delivered
R&I03 Feb-21 Roads and
Infrastructure
Services
Administrative support - rationalise across
service
50.00 2.0 On Track to be Delivered
R&I05 Feb-21 Roads and
Infrastructure
Services
Design service fees - bringing in line with
industry standards and reduce cost of
consultancy. Two posts created as a
50.00 -2.0 On Track to be Delivered
R&I09 Feb-21 Roads and
Infrastructure
Services
Road inspections find and fix -  reduce
reactive work by proactivity. Moving to AI
technology as technology develops
40.00 1.0 On Track to be Delivered
TB12b Feb-18 Roads and
Infrastructure
Services
Review charges for stadiums to enable
improvement work
30.00 0.0 Potential Shortfall
R&I04 Feb-21 Roads and
Infrastructure
Services
Fees and charges - commercial waste,
TTROs, permits/licenses. Access to debt
recovery systems will assist. One post
25.00 -1.0 On Track to be Delivered
TB09 Feb-18 Roads and
Infrastructure
Services
Public Conveniences - Progress
sustainable models including turnstiles
and franchising; establish simpler asset
transfer process
24.00 0.0 Delayed
R&I16 Feb-21 Roads and
Infrastructure
Services
Introduce new fees for electric vehicle
charging
16.00 0.0 On Track to be Delivered
R&I15 Feb-21 Roads and
Infrastructure
Services
Emergency services support and fuel
provision from our fuel supplies
0.50 0.0 Still to be Implemented
TOTAL 1,559.7 11.6
Status of
Implementation
Template
Ref
Saving
Agreed
Service Savings Option
Page 53

Page 54

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE 
11 AUGUST 2022
FINANCIAL RISKS ANALYSIS 2022-23  
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to provide a summary of the key financial risks
facing the Council.   
1.2  A number of Council wide risks, both revenue and capital have been identified
along with risks for each department and service of the Council.  For each
departmental risk the financial impact has been quantified and the likelihood
assessed based on the standard risk matrix. 
1.3 There are 6 Council wide revenue risks identified for 2022-23 currently amounting
to £3.537m. 
1.4 There are currently 42 departmental risks totalling £5.795m.  Of the 42
departmental risks, one is categorised as almost certain and 5 are categorised as
likely.   
1.5 The financial risks are monitored routinely and actions put in place to continue to
mitigate the risks.   
Page 54

Page 55

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE 
11 AUGUST 2022
FINANCIAL RISKS ANALYSIS 2022-23  
2. INTRODUCTION 
2.1 This report outlines the process and approach developed in carrying out a
financial risks analysis and provides a note of the current assessment of financial
risks for 2022-23. 
3 DETAIL 
3.1 Introduction 
3.1.1 The Council is currently in a period of significant financial challenge.  In
developing its budget to address both restricted resources and cost and demand
pressures there are a number of financial risks the Council needs to consider and
manage. 
3.1.2 There are a number of risks that affect the income or expenditure across the
whole council and these have been identified.  Financial risks have been
considered by each department and service of the Council.   
3.1.3 For each risk, the financial impact has been quantified and the likelihood
assessed based on the standard risk matrix as follows: 
1 – Remote
2 – Unlikely
3 – Possible
4 – Likely
5 – Almost Certain 
3.1.4 The Argyll and Bute Integrated Joint Board (IJB) with responsibility for Social
Work and a range of Health services was established and came into effect on 1
April 2016.  The IJB is responsible for financial and strategic oversight of these
services.  It is the responsibility of the IJB to consider the individual financial risks
associated with Integration Services and they are therefore not contained within
this report.  A Council wide risk has been included in respect of the IJB being
unable to deliver the social care service within the budget allocated. 
3.2 Council Wide Risks 
Revenue 
3.2.1 The 2022-23 budget has a 2% pay award assumption across all categories of
worker and all grades.  Negotiations on the 2022-23 award are in progress and
due to the high level of inflation, it is becoming increasingly likely that the Trade
Page 55

Page 56

Unions will be negotiating a deal at more than 2%.  However the affordability for
Local Government has to be considered and based on future estimates, anymore
more than a 2% pay award is deemed to be unaffordable hence why the budget
outlook has been based on 2%.  This is a situation that will be kept under close
review as the pay negotiations advance during the year and the assumption will
be adjusted as required.  For each 1% extra in excess of the 2% built in, there
would be an additional cost of around £1.5m.  The financial risk is recognised at
£1.5m at this stage. 
3.2.2 Utility costs remain a volatile area and it is difficult to accurately predict how the
prices could vary.  The outturn in respect of utilities for 2021-22 was an
underspend of £0.310m which was partly due to fixed price contracts that had
been secured which have now expired. With the volatility of utilities pricing it is
very difficult to predict the impact going forward but a financial risk based on a
20% variation in utility costs amounts to £0.706m. 
3.2.3 The estimated level of council tax income is based on current and forecast Band
D equivalents and non-payment rates.  This reflects our most recent experience in
terms of the council tax base and likely collection rates.  A 1% variation in council
tax income amounts to approximately £0.553m.     
3.2.4 At the budget meeting on 24 February 2022, the Council agreed 6 new policy
savings options that would deliver savings over the period 2022-23 to 2024-25. 
The savings to be delivered in 2022-23 amount to £0.280m.  Whilst the Council
have a good track record in delivering savings, a 10% shortfall on this savings
target would amount to £0.028m.    
3.2.5 In respect of the Health and Social Care Partnership, it is the responsibility of the
Chief Officer and Chief Financial Officer to manage the HSCP financial position. 
If an overspend is forecast, a budget recovery plan will be prepared and
submitted to the IJB, the Council and NHS Highland.  Where recovery plans are
unsuccessful and an overspend occurs at the financial year end, and the HSCP
has insufficient reserves to meet the overspend, then the partners will be required
to make additional payments to the HSCP.  Whilst any additional payments by the
Council and NHS Highland will be deducted from future years funding, there is still
a financial risk that the Council may have to pay out additional monies in year.  As
at 30 June 2022, the net HSCP outturn in 2022-23 is estimated to be a £0.346m
overspend (£0m from Social Work and £0.346m from Health). 
3.2.6 There is an ongoing requirement to fund unavoidable inflationary cost increases in
areas like fuel, food etc. This has been predominantly caused by the lack of
availability of supply of labour and materials as a result of the COVID-19
pandemic, the UK exit from the European Union, Russia’s invasion of Ukraine and
sanctions on Russian owned entities.  The Bank of England are currently
forecasting that inflation will continue to rise until around Quarter 1 of 2023 where
after they forecast that it will start to fall.  We will continue to closely monitor the
situation and update our financial forecasts using the best information available to
us. 
Page 56

Page 57

3.2.7  The Council wide risks are noted within the table below.   
Description Likelihood Assessed
Financial Impact
£000
Pay award exceeding 2% 3 1,500
Energy costs increase by 20% greater
than anticipated
3 706
1% variation in Council Tax Income 2 553
10% shortfall on Savings Options 2 28
IJB refer to Council for additional
funding to deliver social work services
3 0
1% variation of General Inflation Risk  4 750
Total  3,537 
Capital 
3.2.8 The finance settlement announcement on 20 December 2021 provided details of
the Local Government funding for 2022-23 and there is therefore certainty as to
what our funding is in respect of General Capital Grant and the specific capital
grants already distributed. 
3.2.9  The capital plan for 2022-23 includes an estimate of £1.387m in respect of capital
receipts.   This is based on an assessment provided by the Special Projects Team
in January 2022.  A 10% variation equates to £0.139m and this would require to
be managed across the capital programme.   
3.2.10 
3.2.11 
3.2.12
General feedback from Scotland Excel and the Project Managers indicates that
price increases and uncertainty are being experienced as well as disruptions to
the supply chain and longer lead times, particularly in relation to the construction
sector and material availability. This can be attributed to a number of factors such
as the COVID-19 pandemic, UK exit from the European Union, invasion of
Ukraine and sanctions on Russian owned entities to name a few. 
The increased rate of inflation impacts costs such as energy prices, labour,
packaging and transport. These all have an effect on the overall contract price
and make it extremely challenging to manage expenditure and the availability of
supply. 
While it has been possible to estimate the impact of these pressures on some
projects, and therefore include those projections within the capital monitoring
report, for others it has been more difficult and an overspend has not been
forecast at this stage but there are likely to be further significant financial impacts
not yet reported within the following projects: 
- Rothesay Pavilion
- Harbour Investment Programme
- Helensburgh Waterfront Development
- Universal Free School Meals 
Page 57

Page 58

3.2.13 For those liabilities/risks to the capital programme that were known at the start of
2022-23 it was agreed at the budget meeting in February 2022 to use amounts
from the Unallocated General Fund, the 2021-22 Revenue Surplus, COVID-19
specific funding and additional borrowing to mitigate these risks.   
3.3 Departmental/Service Risks 
3.3.1 The detail of each departmental financial risk is included within Appendix 1.  The
following table provides a summary of the number of risks within each department
and likelihood category with the financial impact. 
Department 1 - Remote 2 - Unlikely 3 - Possible 4 - Likely 5 - Almost
Certain Total
No £000 No £000 No £000 No £000 No £000 No £000
Chief Executive's
Unit 1 125 0 0 2 115 0 0 1 500 4 740
Executive Director
Douglas Hendry 2 20 10 765 8 780 2 250 0 0 22 1,815
Executive Director
Kirsty Flanagan 2 110 3 240 8 1,735 3 1,155 0 0 16 3,240
Total 5 255 13 1,005 18 2,630 5 1,405 1 500 42 5,795 
3.3.2 The current top three risks in terms of the financial impact are noted in the table
below. 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance -
Bridges, Culverts
& Sea Defences
Extreme localised weather may result in
loss of bridge, culvert, road or sea defence
3 750
Roads and
Infrastructure
Services
Residual Waste
H&L and Tiree
There is a potential increase to tipping
fees and haulage costs for H&L residual
waste.  The Council’s supplier Barr
Environmental (contract to end of 2023)
lost a tribunal relating to the
underpayment of landfill tax, which may
have led to the Council having to source
alternatives at a higher cost.    Barr
appealed the decision which was heard in
the Spring and they won the case which
should have reduced or eliminated this
financial risk.  However, the Scottish
Government laid an Amendment Order on
Friday 1 July 2022 which came into force
at 1700 on 1 July which indicates that
Landfill tax will be due on materials
previously not chargeable and we have
now received notification of an increase in
4 655
Page 58

Page 59

the cost which officers are currently
assessing
Financial
Services
Council Tax Debt
Collection
Recovery
Recovery of debt becomes more difficult
to pursue in the current economic climate.  
5 500 
3.3.3 The other risks classified as likely are: 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads Materials -
Bitumen
Increased cost of asphalt material due to
price of crude oil rising.  Discussions
emerging from the industry about possible
rationing of bitumen which, if applied, will
affect our programmes due to availability
4 400
Commercial
Services
Catering Costs –
Changes to Food
and Drink in
Schools
Standards
The Scottish Government reviewed the
regulations that govern the food and
drinks currently provided in schools. The
proposed changes were published in June
2019 and were implemented from Easter
2021.  The revised standards focus on
reducing sugar, reducing red and red
processed meat and increasing fibre. Thus
far, there has been an increase in costs
and a reduction in demand for school
meals. 
4 150
Commercial
Services
Catering
Purchases
Increased supplier charges.  This estimate
does not include the additional risk to food
costs and uptake from the changes to food
and drink standards in schools.
4 100
Roads and
Infrastructure
Services
Street Lighting Age of lighting stock requires greater
maintenance as health and safety
becomes a consideration.
4 100 
3.4 Changes to Financial Risks since Budget Pack 
3.4.1 There have been four changes to the departmental risks since the financial risks
report as presented to the Policy and Resources Committee on 24 February
2022, as follows: 
- The risk in relation to Council Tax Debt Collection recovery has been
upgraded from Possible to Almost Certain and the value amended from
£0.100m to £0.500m due to poor collection rates at Week 11 2022-23
compared to the same stage last year.  
Page 59

Page 60

- A new risk has been recognised for Road Materials- Bitumen due to the
price of crude oil rising.  A Likely risk of £0.400m has been recognised.
- The risk in relation to Winter Maintenance has increased in value from
£0.200m to £0.365m in recognition that the price of salt has increased.  
- The risk in relation to Environmental Health export certificates has
increased from Remote to Unlikely and the value amended from £0.030m
to £0.130m to reflect the actual value of outstanding debt and likelihood
that this might not be recovered. 
3.5 Monitoring of Financial Risks 
3.5.1 Financial risks will be reviewed and monitored on a two monthly basis and will be
included in the pack of financial reports submitted to Policy and Resources
Committee.   
4 CONCLUSION 
4.1 This report summarises the key financial risks facing the Council.  There are a
number of Council wide risks and 42 departmental risks identified; one is
categorised as almost certain and 5 are categorised as likely.  The financial risks
are monitored routinely and actions put in place to continue to mitigate the risks.   
5 IMPLICATIONS 
5.1 Policy - None.
5.2 Financial -  The financial value of each risk is included within the
appendix.   
5.3 Legal -  None.
5.4 HR -  None.
5.5 Fairer Scotland Duty - None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty -  None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  Financial risks are detailed within the appendix.
5.8 Customer Service -  None. 
Kirsty Flanagan
Section 95 Officer
8 July 2022 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
APPENDICES
Appendix 1 – Detail of Department/Service financial risks 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 60

Page 61

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Chief Executive's Unit Financial Services Council Tax Debt Collection
Recovery
Recovery of debt becomes more difficult to
pursue in the current economic climate. 
Robust monitoring of arrangements with
debt collection agency and performance
against target collection rates.
3 100 5 500
Chief Executive's Unit Financial Services Housing Benefit Subsidy Loss of Housing Benefit Subsidy due to exceeding
LA error threshold.
Processes in place for handling of claims
accurately and efficiently.
1 125 1 125
Chief Executive's Unit Financial Services Sundry Debt Recovery Recovery of debt becomes more difficult to
pursue in the current economic climate. 
Robust monitoring of arrangements with
debt collection agency. Joint working with
Legal Services to assist services with the
recovery of aged debt.
3 85 3 85
Chief Executive's Unit Financial Services Non-Domestic Rates Relief Risk of demand changing due to legislative
changes outwith our control or new charitable
businesses. 
Outwith direct management control. 3 30 3 30
Executive Director
Douglas Hendry
Commercial Services Property - Central Repairs Increased demands on central repairs as a result
of the decrease in capital funding available and
increases in supplier/contractor charges.
Joint strategy with procurement colleagues
to reduce potential impact of
supplier/contractor charges.  Close
monitoring of central repairs budgets and
commitments and instructing only essential
repairs.
3 300 3 300
Executive Director
Douglas Hendry
Commercial Services Catering Costs – Changes to
Food and Drink in Schools
Standards
The Scottish Government reviewed the
regulations that govern the food and drinks
currently provided in schools. The proposed
changes  were published in June 2019 and were
implemented from Easter 2021.  The revised
standards focus on reducing sugar, reducing red
and red processed meat and increasing fibre.
Thus far, there has been an increase in costs and
a reduction in demand for school meals.
There is a need to work with Education
colleagues to ensure the maximum uptake
of school meals in secondary schools is
achieved.  This is very challenging given the
reduction in secondary school meal uptake
due to COVID.
4 150 4 150
Executive Director
Douglas Hendry
Commercial Services Catering Costs - Provision of
Meals to Early Years Children
The Children and Young People (Scotland) Act
places duties on Councils to provide meals in an
Early Years setting to entitled children where
sessions span over lunch time.  The total
quantum of funding of £1.2m may not be
sufficient to fund the additional costs depending
on uptake and the additional costs to support the
meal provision in partner provider settings.
Joint strategy with Education colleagues to
implement requirements and closely
monitor financial implications.  Costs likely
to be contained within overall early years
funding allocation.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Catering Purchases Increased supplier charges.  This estimate does
not include the additional risk to food cost and
uptake from the changes to food and drink
standards in schools.
Joint strategy with procurement colleagues
to reduce potential impact.  Control food
wastage/portion controls.
4 100 4 100
Executive Director
Douglas Hendry
Commercial Services Catering - Implementation of
Universal Free School Meals in
Primary Schools
The Scottish Government may not give the local
authority adequate funds to support the policy
Catering Manager sits on National
Operational Delivery Group
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Surplus Properties Ongoing market difficulties lead to increased
numbers of surplus properties, there are residual
running costs associated with surplus properties.
One Council property team now in place. 3 50 3 50
As at February 2022
(Budget Setting) As at 30 June 2022
Page 61

Page 62

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at February 2022
(Budget Setting) As at 30 June 2022
Executive Director
Douglas Hendry
Commercial Services Leisure Service Level
Agreements
Increase in RPI resulting in requests for additional
funding.
Monitoring annual alteration to contract
RPI rate and mitigation through financial
forecasting and review of existing budget.
2 25 2 25
Executive Director
Douglas Hendry
Commercial Services Rental Income from Properties Due to current economic climate there may be
reduced ability to recover rental income from
leased properties or place suitable tenants in
properties as leases come to an end.
Management of leasehold properties by
Estates team, any issues with debt recovery
being dealt with in line with Council debt
recovery policy.
2 20 2 20
Executive Director
Douglas Hendry
Education Central Repairs Increased demands on budget as a result of
increase in statutory and emergency repairs and
increases in supplier/contractor charges.
Regular liaison with Property Services re
prioritisation and commitment of in-year
spend.
2 100 2 100
Executive Director
Douglas Hendry
Education ASN Support Demand for ASN support continues to increase,
resulting in an additional resource requirement.
The effect of COVID-19 has further increased
demand on this service.
Scottish Government has given additional
funding for "additional support needs
priority for learning" and this has been built
into the budget, this will help reduce the
demand risk 
3 100 3 100
Executive Director
Douglas Hendry
Education Pre-Five Units - retention of
partner providers
Failure in the commissioning or retention of pre-
five partner provider units to deliver 1140 hours
would result in an increased pressure on the
Council to deliver the service.
Annual financial appraisal; Support
network; Short-term cash injections.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Children and Young People
(Scotland) Act - ELC 1140 hours
The Council has been required to deliver 1140
hours of Early Learning and Childcare since
August 2021.  The Scottish Government has
committed to funding this and the Council has
altered the implementation plan to align it to the
Scottish Government funding profile.  A risk
remains that actual costs of delivery exceed the
Government Grant in any given year.  For
example, if child numbers are higher than
estimated, this may require additional staffing
which has not been built into the staffing model
funded by Scottish Government.
Continuous monitoring and review of the
implementation plan, usage and resources.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Education (Scotland) Act
Education (Scotland) Act 2000 was enacted
March 2016.  This places additional requirements
on Councils to carry out assessments of the need
for the provision of Gaelic Medium Primary
Education (GMPE) and the duty to support and
promote Gaelic Education. May lead to additional
staffing requirements.
Monitoring developments of the
implementation of the Act and statutory
guidance produced and adhered too.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Hub DBDA/DBFM Schools  -
Litigation
Increased risk of the requirement to litigate to
conclude final capital contract payments due.
Monitoring claims and mitigation through
robust challenge of any additional claims.
2 150 2 150
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Contract RPI for NPDO and Hub
Schools
Increase in RPI would result in higher costs. Monitoring annual alteration to contract
RPI rate and mitigation through financial
forecasting and review of existing budget.
2 100 2 100
Page 62

Page 63

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at February 2022
(Budget Setting) As at 30 June 2022
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO - Reduction in insurance
savings within NPDO Schools
Increase in insurance costs as a result of Covid-19
and flood claims.
Monitoring annual alteration to contract
insurance rate and mitigation through
financial forecasting and review of existing
budget.
2 75 2 75
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services - Litigation Increased number of litigation cases. Ensure Legal Services are gateway to access
all legal advice and that advice is sought at
earliest opportunity.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO/Hub DBFM contract
management efficiencies
Reduction in ability to generate contract
management efficiencies.
Monitoring annual efficiencies generated
and mitigation through robust contract
management and application of contract
specifications/requirements.
2 50 2 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Elections More than 1 by-election required outwith
standard election cycle.
Outwith direct management control. 2 45 2 45
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Licensing Reduced numbers of licensing applications
leading to reduced income.
Monitoring of trends and reporting the
financial impact in the budget monitoring.
3 30 3 30
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Children's Panel Increased number of referrals increasing costs
through increases in the running costs.
Maximise the use of council
facilities/resources for panel session in the
first instance.
1 10 1 10
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services Failure to minimise Council wide use of external
legal advice.
Ensure legal services are gateway to access
all legal advice.
1 10 1 10
Executive Director
Kirsty Flanagan
Customer Support Services Software Licences Potential risk of being underlicensed for software
which will be identified via software audits which
would incur additional costs.
ICT security and compliance officer in post
and duties include review of systems to
ensure fully licenced. 
2 100 2 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Environmental Health- export
certificates
Downturn in requests for export certificates as a
result of UK withdrawal from EU, changes to
international trading agreements or business
economy. Reduction in demand creates a budget
pressure on environmental health budget.
Monitor income and resources required for
export health certificates/attestations
required to support the export market.
Continue with food safety regulation
activities associated and support at 3rd
country audits.  Pursue debt rigorously with
key customers through seeking regular
payments.
1 30 2 130
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Dangerous Buildings
interventions
Building Standards having to deal with an
increasing level of dangerous building work which
has significant financial implications for Council.
Monitor activity and seek to recover costs
from the owner.
3 100 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fees reduced by
Scottish Government
Scottish Government reducing planning fees due
to poor performance by the Planning Authority. 
Details of national Planning Performance Co-
ordinator and Fee Reform still awaited.
Maintain high levels of performance as
articulated by performance markers
detailed in Planning Performance
Framework annual report.
1 100 1 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fee shortfalls Due to downturn in economic / building activity,
in particular renewable energy development and
other major developments could lead to planning
fee income shortfalls leading to revenue budget
pressures.
Continue to monitor Development
Management income and expenditure
tightly and investigate further income
generation streams.  Lobby Scottish
Ministers through professional
organisations to increase planning fees to a
sustainable level.
3 100 3 100
Page 63

Page 64

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at February 2022
(Budget Setting) As at 30 June 2022
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Building Warrant fee shortfalls Due to loss of commercial income and downturn
in economic / building activity, building warrant
fee income shortfalls leading to revenue budget
pressures.
Continue to monitor Building Standards
income and expenditure tightly and
investigate further income generation
streams. 
3 100 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Homelessness Temporary
Accommodation Income
Unpredictable number of Homeless applications.
Inability to recover rent.  Increase costs of
property maintenance and tenancy change over.
Provision of Housing Options information
and advice service to minimise number of
applicants proceeding to full homeless
application.  Implementation of Rapid
Rehousing Plan.
3 50 3 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Animal Health Carrying out livestock seizure to protect welfare
of the animals
Monitor activity and seek to recover costs
from the disposal of the animals.
1 10 1 10
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Airfields and Air Services -
usage
The PSO for the existing air service to Coll and
Colonsay operating from Connel Airport is due in
2022.  It is likely that this will create a budget
pressure for a new contract to be established to
serve the needs of the island communities.
Need to start early in raising awareness of
the contract possibility with external
contractors.  This renewal of the contract
has to also be raised with the Scottish
Government as there may need to
additional Government support to retain
this life line service.
2 10 2 10
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Roads Maintenance - Bridges,
Culverts & Sea Defences
Extreme localised weather may result in loss of
bridge, culvert, road or sea defence.
The recent storm damage to Bute Sea Wall is
likely to cost in excess of £1m to repair so the
value on this risk has been updated for 22-23 in
recognition of the potential costs associated with
this risk
Routine inspections to deal with potential
weak areas - based on a stitch in time repair
regime.
3 750 3 750
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Residual Waste H&L and Tiree There is a potential increase to tipping fees and
haulage costs for H&L residual waste.  The
Council’s supplier Barr Environmental (contract to
end of 2023) lost a tribunal relating to the
underpayment of landfill tax, which may have led
to the Council having to source alternatives at a
higher cost.    Barr appealed the decision which
was heard in the Spring and they won the case
which should have reduced or eliminated this
financial risk.  However, the Scottish Government
laid an Amendment Order on Friday 1 July 2022
which came into force at 1700 on 1 July which
indicates that Landfill tax will be due on materials
previously not chargeable and we have now
received notification of an increase in the cost
which officers are currently assessing
Officers currently assessing the potential
impact on the Council.
4 655 4 655
Page 64

Page 65

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at February 2022
(Budget Setting) As at 30 June 2022
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Roads Materials - Bitumen Increased cost of asphalt material due to price of
crude oil rising.  Discussions emerging from the
industry about possible rationing of bitumen
which, if applied, will affect our programmes due
to availability
Increased costs are currently being
managed but with further increases likley,
this is being closely monitored by managers
to evaluate the impact.
4 400
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Winter Maintenance Adverse weather conditions which require
greater than budgeted number of gritting runs.
Monitor weather conditions and apply
gritting policy to minimise costs.
3 200 3 365
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Roads Maintenance - Roads
Network
Adverse weather conditions result in
deterioration of the road network necessitating
greater spend on repair of defects.
Manage maintenance budgets to ensure
that spend is prioritised to deal with safety
defects.
3 230 3 230
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Street Lighting Age of lighting stock requires greater
maintenance as health and safety becomes a
consideration.
Manage maintenance budgets to ensure
that spend is prioritised to deal with safety
defects.
3 100 4 100
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Ferry Services - income Changes to ferry services resulting in reduced
passenger income.
Ensure that ferry operators are charged for
the correct number of passengers
3 40 3 40
41 4,730 42 5,795 Page 65

Page 66

ARGYLL  AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE  
FINANCIAL SERVICES 11 AUGUST 2022 
CAPITAL BUDGET MONITORING REPORT – 30 JUNE 2022 
1.0 EXECUTIVE SUMMARY 
1.1 This provides an update on the position of the capital budget as at 30 June
2022. The report provides information on the financial position in respect of the
capital plan and also the performance in terms of delivery of capital plan
projects. 
1.2  Financial Position: 
 Current Year to Date – actual net expenditure to date is £3,777k
compared to a budget for the year to date of £3,765k giving rise to an
overspend for the year to date of £12k (0.3%).
 Forecast Outturn for 2022-23 – forecast net expenditure for the full
financial year is £29,319k compared to an annual budget of £48,555k
giving rise to a forecast underspend for the year of £19,236k (39.6%).    
 Total Capital Plan – forecast total net project costs on the total capital
plan are £177,521k compared to a total budget for all projects of
£177,387k giving rise to a forecast overspend for the overall capital plan
of £134k (0.08%). 
1.3 Project Delivery: 
 Asset Sustainability – Out of 91 projects there are 85 projects (93%) on
track, 6 projects (7%) off track but recoverable and 0 projects off track
(0%).
 Service Development - Out of 41 projects there are 36 projects (88%) on
track, 5 projects (12%) off track but recoverable and 0 projects (0%) off
track.
 Strategic Change – Out of 27 projects there are 24 projects (89%) on
track, 3 projects (11%) off track but recoverable and 0 projects (0%) off
track.   
1.4 
1.5
The Capital Programme is funded by various income streams as detailed in
Appendix 5. Additional funding allocated since the last report has come from
SPT, Crown Estate, Scottish Government, income from Lismore Ferry sale and
HITRANS. 
The Council is projecting £1,387k of capital receipts this financial year. At this
early stage in the year no receipts have been received but this will be closely
monitored throughout the year and any issues highlighted. 
Page 66

Page 67

ARGYLL  AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE  
FINANCIAL SERVICES 11 AUGUST 2022 
CAPITAL BUDGET MONITORING REPORT – 30 JUNE 2022 
2.0  INTRODUCTION 
2.1 
2.2 
2.3 
2.4 
2.5 
This report provides an update on the position of the capital budget as at 30 June
2022. The report provides information on the financial position in respect of the
capital plan and also the performance in terms of delivery of capital plan projects. 
Following the decision at Policy and Resources Committee on 9 December 2021,
the Rothesay Pavilion project is on pause whilst potential funding options are being
considered. The financial information included within this report therefore now
excludes amounts relating to Rothesay Pavilion.   
A £1m cost pressure was identified during 2021-22 in relation to repairs to the
A884 Ardbeg Sea Wall, where severe storm damage resulted in failure of the sea
wall on Bute. Emergency works were carried out and a permanent solution is
currently being developed. Additional funding of £1m was allocated for this
purpose at the Council meeting on 24 February 2022 however there remains a risk
that costs will exceed this. It was agreed at Environment, Development and
Infrastructure Committee on 2 June 2022 that the Chair would approach the
Scottish Government with a view to securing additional resources to support the
scheme. 
Project Managers were asked to identify specific Covid-19 impacts on the capital
programme. At the budget meeting on 25 February 2021, the Council agreed to
provide £2.5m of funding and following agreement at the Policy and Resources
Committee on 14 October 2021, this, plus a further £0.146m, was added to the
capital programme. 
Furthermore, at the budget meeting on 24 February 2022, an additional £3.9m was
set aside for future capital contract increases. This includes up to £1.2m for
Campbeltown Flood Scheme, the final costs of which are estimated to be
£15.215m. The Scottish Government will fund 80% of scheme costs with the
Council expected to contribute an estimated £3.043m. 
The impact of the pandemic along with the UK exit from the European Union,
invasion of Ukraine and sanctions on Russian owned entities has seen significant
price increases as well as disruptions to the supply chain and longer lead in times.
The increased rate of inflation impacts costs such as energy prices, labour,
packaging and transport. These all have an effect on the overall contract price and
make it extremely challenging to manage expenditure and the availability of
supply. 
As a result of this it should be noted that there are likely to be other significant
financial impacts which are not quantifiable at this stage, as follows: 
 Rothesay Pavilion – project currently paused due to increased costs as a
result of the main contractor being placed into administration in March 2020. 
Page 67

Page 68

4.0 CURRENT YEAR TO DATE FINANCIAL POSITION 
4.1 
4.2
Overall Position 
Actual net expenditure to date is £3,777k compared to a budget for the year to
date of £3,765k giving rise to an overspend for the year to date of £12k (0.3%). 
Project/Department Position 
The table below shows the year to date net expenditure against the year to date
budget by project type and service: 
Project Type:
Year to
Date
Budget    
£'000
Year to
Date
Actual    
£'000
Variance       
£'000
Asset Sustainability 969 1,016 (47)
Service Development 619 584 35
Strategic Change 2,177 2,177 0
Total  3,765 3,777 (12)
Service:      
ICT 545 545 0
Education 1,093 1,055 38
Live Argyll 21 68 (47)
Health & Social Care Partnership 0 0 0
Shared Offices 11 11 0
Roads & Infrastructure 139 141 (2)
Development & Economic Growth 258 259 (1)
CHORD 1,698 1,698 0
Total 3,765 3,777 (12) 
Material variances are explained in Appendix 1 and there are a number of small
variances contributing to the year to date overspend. 
 Harbour Investment Programme – likely to be contractual cost increases in
future years (expected to be funded from increased fees and charges).
 Helensburgh Waterfront Development – commercial negotiations are
ongoing with the main contractor to determine financial impact.  
 Universal Free School Meals – delayed roll out to P6 and P7 and uncertain
capital funding levels available from Scottish Government (delay not
mentioned as part of Resource Spending Review). 
 Other general construction inflationary increases.
3.0 RECOMMENDATIONS 
3.1 Note the contents of this report and the financial summaries as detailed in
Appendix 7 and approve the proposed changes to the capital plan detailed in
Appendix 4.
Page 68

Page 69

5.0  FORECAST OUTTURN 2022-23 
5.1  Overall Position 
Forecast net expenditure for the full financial year is 29,319k compared to an annual
budget of £48,555k giving rise to a forecast overspend for the year of £19,236k
(39.6%).  This is largely due to £19,370k of re-profiling budgets at the start of the
financial year and does not reflect genuine underspends within the programme. 
5.2 Project/Department Position 
The table below shows the forecast expenditure and budget for the year by project
type and service. 
Project Type:
Annual
Budget            
£'000
Forecast
Outturn        
£'000 
Forecast
Variance 
COVID-
19
Related       
£'000
Forecast
Variance 
Non
COVID-
19
Related       
£'000
Forecast
Variance         
£'000
Asset Sustainability 26,627 26,685 0 (58) (58)
Service Development 4,500 4,560 0 (60) (60)
Strategic Change 17,428 (1,926) 0 19,354 19,354
Total  48,555 29,319 0 19,236 19,236
Service:          
ICT 1,518 1,518 0 0 0
Education 6,097 6,109 0 (12) (12)
Live Argyll 1,235 1,304 0 (69) (69)
Health & Social Care
Partnership 2,107 2,109 0 (2) (2)
Shared Offices 4,197 4,213 0 (16) (16)
Roads & Infrastructure 26,712 7,376 0 19,336 19,336
Development &
Economic Growth 2,770 2,771 0 (1) (1)
CHORD 3,919 3,919 0 0 0
Total 48,555 29,319 0 19,236 19,236 
Material variances are explained in Appendix 2 and there are a number of smaller
variances contributing to the forecast overspend. 
Page 69

Page 70

6.0  TOTAL PROJECT COSTS 
6.1 Overall Position 
Forecast total net project costs on the total capital plan are £177,521k compared to
a total budget for all projects of £177,387k giving rise to a forecast overspend for
the overall capital plan of £134k (0.08%). 
6.2  Project/Department Position 
The table below shows the forecast expenditure and budget for the total capital
plan by project type and service. 
Project Type:
Capital
Plan
Budget           
£'000
Forecast
Project
Costs        
£'000 
Capital
Plan
Variance 
COVID-19
Related       
£'000
Capital
Plan
Variance 
Non
COVID-
19
Related       
£'000
Total
Capital
Plan
Variance         
£'000
Asset Sustainability 50,444 50,502 0 (58) (58)
Service Development 18,838 18,898 0 (60) (60)
Strategic Change 108,105 108,121 0 (16) (16)
Total  177,387 177,521 0 (134) (134)
Service:          
ICT 5,007 5,007 0 0 0
Education 41,833 41,845 0 (12) (12)
Live Argyll 3,368 3,437 0 (69) (69)
Health & Social Care
Partnership 4,222 4,224 0 (2) (2)
Shared Offices 21,507 21,523 0 (16) (16)
Roads &
Infrastructure 52,878 52,912 0 (34) (34)
Development &
Economic Growth 4,734 4,735 0 (1) (1)
CHORD 43,838 43,838 0 0 0
Total 177,387 177,521 0 (134) (134) 
Material variances are explained in Appendix 3 and there are a number of
smaller variances leading to the forecast overspend. 
Page 70

Page 71

7.0  TOTAL PROJECT PERFORMANCE 
7.1 Overall Position 
There are 159 projects within the Capital Plan, 145 are Complete or On Target, 14
are Off Target and Recoverable and none are Off Track. 
7.2  Project Position 
The table below shows the Performance Status of the Projects in the Capital Plan. 
Project Type:
Complete
/ On
Target
Off Target/
Recoverable
Off Target/
Problem Total    
COVID
-19
Related
Non-
COVID
-19
Related
COVID
-19
Related
Non-
COVID
-19
Related 
Asset
Sustainability 85 0 6 0 0 91
Service
Development 36 0 5 0 0 41
Strategic
Change 24 0 3 0 0 27
Total 145 0 14 0 0 159
Service:            
ICT 7 0 0 0 0 7
Education 29 0 1 0 0 30
Live Argyll 22 0 6 0 0 28
Health & Social
Care Partnership 16 0 1 0 0 17
Shared Offices 21 0 0 0 0 21
Roads &
Infrastructure 30 0 5 0 0 35
Development &
Economic
Growth 16 0 0 0 0 16
CHORD 4 0 1 0 0 5
Total 145 0 14 0 0 159 
Page 71

Page 72

7.3  Chart of Performance Status 
The graph provides a view of the Performance Status of the Projects included  in
the Capital Plan: 
Page 72

Page 73

8.0 OFF TRACK PROJECTS 
8.1 
9.0 
9.1 
10.0
There are no Off Track projects currently being reported. 
STRATEGIC CHANGE PROJECTS 
Appendix 6 gives detailed information in respect of the Strategic Change
Projects within the Capital Plan. The appendix gives details of the forecast cost
of the project against the approved budget, the start and anticipated completion
date of the project and an assessment of the risks of the project and if these are
not green gives an explanation of the problem. 
CHANGES TO CAPITAL PLAN 
10.1  The table below shows proposed changes to the Capital Plan at summary level
which include slippages, accelerations and virements. Explanations relating to
the specific projects involved can be seen in Appendix 4. 
The updated capital plan incorporating these proposed changes can be found in
Appendix 8. 
Department Prev.
Agreed
Changes 
2022-23
£'000
22-23
£'000 
COVID-
19
Related
22-23
£'000 
Non
COVID-
19
Related
23-24
£'000
24-25
£'000
Future
Years
£'000
Total 
£'000
Asset
Sustainability 0 0 0 0 0 0 0
Service
Development 0 0 0 0 0 0 0
Strategic
Change 0 0 (19,370) 6,140 4,731 15,389 6,890
Total 0 0 (19,370) 6,140 4,731 15,389 6,890                
Service:              
ICT 0 0 0 0 0 0 0
Education 0 0 0 0 0 0 0
Live Argyll 0 0 0 0 0 0 0
Health &
Social Care
Partnership
0 0 0 0 0 0 0
Shared Offices 0 0 0 0 0 0 0
Roads &
Infrastructure 0 0 (19,370) 6,140 4,731 15,389 6,890
Development
& Economic
Growth
0 0 0 0 0 0 0
Major Projects 0 0 0 0 0 0 0
Total 0 0 (19,370) 6,140 4,731 15,389 6,890 
Page 73

Page 74

11.0          FUNDING 
11.1 
11.2 
12.0 
12.1 
12.2 
12.3 
12.4 
12.5 
12.6 
12.7 
12.8
The Capital Programme is funded by various income streams as detailed in
Appendix 5. Additional funding allocated since the last report has come from
SPT, Crown Estate, Scottish Government, income from Lismore Ferry sale and
HITRANS. 
The Council is projecting £1,387k of capital receipts this financial year. At this
early stage in the year no receipts have been received but this will be closely
monitored throughout the year and any issues highlighted. 
IMPLICATIONS 
Policy – Monitors progress against the capital plan. 
Financial – Monitors funding and commitments of the capital plan. 
Legal – Available funding may not address all Statutory and Regulatory
requirements in relation to Health and Safety. 
HR – Available funding may have an impact on the sustainability of the Property
Design Team and Infrastructure Design Team. 
Fairer Scotland Duty – None. 
12.5.1     Equalities – protected characteristics – None. 
12.5.2     Socio-economic Duty – None. 
12.5.3     Islands – None. 
Climate Change – The Council is committed to addressing climate change via
projects within the capital plan. 
Risk – There are risks around increasing capital contract costs and the level and
timing of capital receipts. 
Customer Service – None. 
Kirsty Flanagan 
Executive Director / Section 95 Officer 
8 July 2022                                                  
Policy Lead for Finance and Commercial Services – Councillor Gary
Mulvaney 
For further information contact: Anne Blue, Head of Financial Services 
APPENDICES 
- Appendix 1 – Year To Date finance variance explanations
- Appendix 2 – Forecast Outturn variance explanations
- Appendix 3 – Total Project finance variance explanations
- Appendix 4 – Changes to Capital Plan and Financial Impact
- Appendix 5 – Capital Funding
- Appendix 6 - Cumulative spend, completion dates and risks relating                         
to significant capital projects. 
- Appendix 7 - Financial Summary – Overall
- Financial Summary – Executive Director Kirsty Flanagan
- Financial Summary – Executive Director Douglas Hendry
- Appendix 8 - Updated/Revised Capital Plan 
Page 74

Page 75

APPENDIX 1 – Year to Date Financial Variance Explanations
Listed below are the projects where the variance is +/- £50k.
Project
YTD
Budget
£’000
YTD
Actual
£’000
(Over)/
Under
Variance       
£’000
Explanation    
No variances +/-£50k for this report.
Other variances under £50k   (12) Total value of non-material variances less than +/-£50k
Total   (12) 
Page 75

Page 76

APPENDIX 2 – Outturn Variance Explanations
Listed below are the projects where the current year variance is +/- £50k. 
Project 
Annual
Budget
£’000
Outturn
£’000 
(Over)/
Under
Forecast
Variance
COVID-19
Related         
£’000
(Over)/
Under
Forecast
Variance
Non COVID-
19 Related         
£’000
Total
(Over)/
Under
Forecast
Variance         
£’000
Explanation
Campbeltown Flood Scheme 10,354 9,098  0 1,256 1,256 Slippage in line with contractor cashflow
Harbour Investment Programme 33,664 15,550  0 18,114 18,114 Slippage in line with Asset Management Plan
Other variances under £50k                  0 (134) (134) Total value of non-material variances less than +/-
£50k.
Total  0 19,236 19,236 
Page 76

Page 77

APPENDIX 3 – Total Project Finance Variances
Listed below are the projects where the total project variance is +/- £50k. 
Project 
Capital
Plan
Budget
£’000
Forecast
Project
Costs
£’000 
(Over)/
Under
Forecast
Variance
COVID-19
Related         
£’000
(Over)/
Under
Forecast
Variance
Non COVID-
19 Related        
£’000
Total
(Over)/
Under
Forecast
Variance         
£’000
Explanation       
No variances +/-£50k for this report.
Other variances under £50k             (134) (134) Total value of non-material variances less than +/-
£50k. Project Managers are working to reduce these
small individual overspends by identifying
underspends elsewhere within the capital plan.
Total  (134) (134) 
Page 77

Page 78

APPENDIX 4 – Changes to Capital Plan and Financial Impact
OVERALL COST CHANGES
Project
2022-
23
£’000
2023-
24
£’000
2024-
25
£’000
Future
Years
£’000
Total
Capital Plan
£’000
Recommendation Explanation      
No overall cost changes this reporting period.
Total Cost Changes 0 0 0 0 0   
SLIPPAGES AND ACCELERATIONS
Project 2022-23
£’000
2023-
24
£’000
2024-
25
£’000
Future
Years
£’000 
2022-23
Slippage
Related
to
COVID-
19
£’000
2022-23
Slippage
Related
to Non
COVID-19
£’000
Total
2022-23 
£’000
Recommendation Explanation
Campbeltown Flood
Scheme (1,256) (75) 1,331 0  0 (1,256) (1,256) Slip budget into
future years.
Budget profile in line with
anticipated spend.
Harbour Investment
Programme (18,114) 6,215 3,400 15,389  0 (18,114) (18,114) Slip budget into
future years
Budget profile in line with
anticipated spend based on
Asset Management Plan.
Total Slippages and
Accelerations
(19,370) 6,140 4,731 15,389  0 (19,370) (19,370)  
Net Impact of
Changes
(19,370) 6,140 4,731 15,389  0 (19,370) (19,370)   
Page 78

Page 79

CAPITAL PROGRAMME FUNDING Appendix 5
Estimated
Capital
Funding
Carry
Forwards
from 21-22
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
Estimated
Capital
Funding
Carry
Forwards
from 21-22
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
Estimated
Capital
Funding
Carry
Forwards
from 21-22
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
General Capital Grant 9,569 0 0 0 9,569 9,569 0 0 0 9,569 9,569 0 0 0 9,569
Transfer to Revenue for Private Sector Housing Grant (PSHG) -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033
Capital Receipts 1,387 0 0 0 1,387 1,095 0 0 0 1,095 0 0 0 0 0
Flooding Allocation 155 0 0 0 155 155 0 0 0 155 155 0 0 0 155
Ring Fenced Capital Grant 4,656 2,722 0 268 7,646 0 5,728 0 0 5,728 0 0 0 0 0
Restricted Funding 1,486 609 0 756 2,851 1,150 0 0 0 1,150 0 0 0 0 0
Funded by Reserves 3,145 4,388 -1,256 7 6,284 36 172 -75 0 133 0 0 1,331 0 1,331
Additional Funding from Revenue 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Insurance 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Harbour Investment Programme 31,180 2,484 -18,114 0 15,550 16,900 0 6,125 0 23,025 31,600 0 -3,400 0 28,200
Prudential Borrowing 15,528 3,352 100 0 18,980 5,006 -1,429 -100 0 3,477 27 0 0 0 27
Loans Fund Review 0 4,025 0 0 4,025 0 0 0 0 0 0 0 0 0 0
COVID Funding 1,640 2,167 0 0 3,807 0 0 0 0 0 0 0 0 0 0
67,713 19,747 -19,270 1,031 69,221 32,878 4,471 5,950 0 43,299 40,318 0 -2,069 0 38,249
BREAKDOWN OF ADDITIONAL FUNDING
Additional Funding 2022-23 2023-24 Reported
C'town Museum LA income 40 Live Argyll Jun-22
H&L/Rosneath Cycleways 140 Jun-22
Nature Restoration Fund 238 Jun-22
Rothesay Pontoons 315 Grant Funding Jun-22
Ardrishaig North 280 Grant Funding Jun-22
Lismore Ferry 7 External Income Jun-22
Lochgilphead PS Demolition 11 Reserves Jun-22
Total 1,031 0
2024-252023-24
Source
2022-23
SPT
Scottish Government
Page 79

Page 80

Strategic Change Projects - Cumulative Spend, Start/Finish Dates and Project Risks APPENDIX 6
Strategic Change Projects
Prior Years
Spend
£'000
Current Year
Forecast
£'000
Total Project
Forecast
£'000
Total Project
Budget
£'000
Project Start
Date
Original
Estimated
Completion
Date
Project
Risks
Identified Explanation
CHORD Oban 7,129 651 7,905 7,905 27/10/2016 31/03/2022 Amber Issues with contract close out impacting on timescales.
Harbour Investment Programme 1,802 15,550 91,292 91,292 01/04/2017 31/03/2028 Amber Project expenditure profile updated to reflect Asset Management Plan.
Campbeltown Flood Scheme 181 9,098 15,215 15,215 01/08/2016 31/03/2023 Amber Work expected to start over summer months.
Dunoon Primary 7,170 304 10,869 10,869 18/12/2014 30/04/2020 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Kirn Primary School 9,878 99 10,119 10,119 24/04/2014 31/10/2017 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Replacement of Oban High 2,496 136 3,250 3,250 24/04/2014 31/01/2019 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Street Lighting LED Replacement 2,700 791 3,900 3,900 01/08/2016 30/03/2022 Green Tender for final package of works still to be awarded - budget to be reprofiled.
Helensburgh Office Rationalisation 11,500 310 11,838 11,838 25/04/2013 31/03/2022 Green Project subject to legal dispute.
CHORD Dunoon 12,238 55 12,522 12,522 03/02/2012 09/03/2018 Green
Main contract complete and retentions paid. Landscaping and remediation works ongoing but
issues with water ingress may require works in 22-23.
Helensburgh Waterfront Development 1,387 2,895 22,557 22,557 01/04/2017 31/03/2024 Green Additional funding awarded resulting in increased budget. Budget to be reprofiled.
Kilmory Business Park Phase 2AA 0 141 150 150 01/02/2022 01/09/2023 Green Development Agreement still to be concluded.
Carbon Management Business Cases 201 60 261 261 01/02/2014 31/03/2022 Green Budget to be reprofiled pending development of new projects.
Carbon Management - Group Heating Conversion Project 1,938 10 1,948 1,948 01/02/2016 31/03/2022 Green Complete.
Carbon Management - Non Education 14 21 50 50 01/04/2015 31/03/2022 Green Projects being determined.
NPDO Schools Solar PV Panel Installations 761 183 944 944 26/06/2014 31/03/2022 Green Budget to be reprofiled pending development of new projects.
Non NPDO Schools Solar PV Panel Installations 400 88 488 488 20/03/2014 31/03/2022 Green Budget to be reprofiled pending development of new projects.
Carbon Management Capital Property Works 2016/17 19 20 39 39 01/02/2016 31/03/2022 Green Budget to be reprofiled pending development of new projects.
Oil to Gas Heating Conversions 182 5 187 187 01/02/2012 31/03/2022 Green Budget to be reprofiled pending development of new projects.
TIF - Halfway House Roundabout 0 597 640 640 tbc tbc Green Scope of project still to be determined - budget to be reprofiled.
Dunoon Pier OBC 2,844 0 2,844 2,844 03/02/2012 26/02/2016 Green Project complete.
Campbeltown Office Rationalisation 595 1 596 596 01/02/2015 31/03/2019 Green Complete.
TIF - Oban Airport Business Park 447 101 590 590 22/01/2015 31/03/2022 Green
Campbeltown Schools Redevelopment 1,649 76 2,130 2,130 16/02/2012 30/11/2018 Green Physically complete - negotiations with contractor delaying payment of financial sums outstanding.
CHORD - Helensburgh 6,483 28 6,557 6,557 29/09/2011 30/04/2015 Green Main contract complete. Art project originally proposed for 21-22 now slipped into 22-23.
TIF - North Pier Extension 214 0 214 214 06/12/2017 06/12/2021 Green Complete.
TIF - Lorn/Kirk Road 1,959 1 2,170 2,170 22/01/2015 31/03/2021 Green Complete.
Carbon Management Fuel Conversions 107 0 107 107 01/02/2014 31/03/2019 Green Complete.
Kilmory Biomass  Carbon Management 956 0 956 956 20/09/2012 31/03/2019 Green Complete.
Strategic Change Total 75,250 31,221 210,338 210,338
Project Risk Classifications:
Green - Risks can be managed and are viewed as stable or reducing.
Amber - Risks are increasing but are still manageable.
Red - Risks are increasing or have increased to such an extent they may affect delivery of the project.
Capital Expenditure Dates Risks
Page 80

Page 81

ARGYLL AND BUTE COUNCIL - CAPITAL PLAN MONITORING REPORT - OVERALL COUNCIL
FINANCIAL SUMMARY - NET EXPENDITURE
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Executive Director Douglas Hendry 415 462 (47) 10,030 10,088 (58) 19,032 19,090 (58)
Executive Director Kirsty Flanagan 554 554 0 18,029 18,029 0 32,844 32,844 0
Asset Sustainability Total 969 1,016 (47) 28,059 28,117 (58) 51,876 51,934 (58)
Service Development Projects
Executive Director Douglas Hendry 254 254 0 1,242 1,267 (25) 15,144 15,169 (25)
Executive Director Kirsty Flanagan 415 437 (22) 7,304 7,339 (35) 32,600 32,635 (35)
Service Development Total 669 691 (22) 8,546 8,606 (60) 47,744 47,804 (60)
Strategic Change Projects
Campbeltown Schools Redevelopment 38 38 0 76 76 0 2,130 2,130 0
Dunoon Primary 257 257 0 304 304 0 10,869 10,869 0
Replacement of Oban High 96 96 0 136 136 0 3,250 3,250 0
Kirn Primary School 65 65 0 99 99 0 10,119 10,119 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Carbon Management Business Cases 0 0 0 60 60 0 261 261 0
NPDO Schools Solar PV Panel Installations 0 0 0 183 183 0 944 944 0
Non NPDO Schools Solar PV Panel Installations 0 0 0 88 88 0 488 488 0
Carbon Management Fuel Conversions 0 0 0 0 0 0 107 107 0
Carbon Management Capital Property Works 2016/17 0 0 0 20 20 0 39 39 0
Carbon Management - Group Heating Conversion Project 0 0 0 10 10 0 1,948 1,948 0
Kilmory Biomass  Carbon Management 0 0 0 0 0 0 956 956 0
Oil to Gas Heating Conversions 0 0 0 5 5 0 187 187 0
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 0 0 0 310 310 0 11,838 11,838 0
Clean Energy 0 0 0 551 567 (16) 729 745 (16)
Clean Energy 2022-23 0 0 0 500 500 0 500 500 0
Campbeltown Flood Scheme 23 23 0 10,354 9,098 1,256 15,215 15,215 0
Street Lighting LED Replacement 0 0 0 791 791 0 3,900 3,900 0
Harbour Investment Programme 138 138 0 33,664 15,550 18,114 91,292 91,292 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - North Pier Extension 0 0 0 0 0 0 214 214 0
TIF - Oban Airport Business Park 0 0 0 101 101 0 590 590 0
TIF - Halfway House Roundabout 0 0 0 597 597 0 640 640 0
CHORD - Helensburgh 0 0 0 28 28 0 6,557 6,557 0
CHORD Dunoon 2 2 0 55 55 0 12,522 12,522 0
CHORD Oban 0 0 0 651 651 0 7,905 7,905 0
Helensburgh Waterfront Development 1,696 1,696 0 2,895 2,895 0 22,557 22,557 0
HWD - FFE (Funded by LA) 0 0 0 344 344 0 350 350 0
Kilmory Business Park Phase 2AA 0 0 0 141 141 0 150 150 0
Dunoon Pier OBC 0 0 0 0 0 0 2,844 2,844 0
Strategic Change Total 2,315 2,315 0 51,986 32,632 19,354 211,917 211,933 (16)
Total Expenditure 3,953 4,022 (69) 88,591 69,355 19,236 311,537 311,671 (134)
INCOME
Asset Sustainability
Executive Director Douglas Hendry 0 0 0 0 0 0 0 0 0
Executive Director Kirsty Flanagan 0 0 0 (1,432) (1,432) 0 (1,432) (1,432) 0
Asset Sustainability Total 0 0 0 (1,432) (1,432) 0 (1,432) (1,432) 0
Service Development Projects
Executive Director Douglas Hendry 0 (38) 38 0 0 0 (7,771) (7,771) 0
Executive Director Kirsty Flanagan (61) (69) 8 (4,046) (4,046) 0 (21,135) (21,135) 0
Service Development Total (61) (107) 46 (4,046) (4,046) 0 (28,906) (28,906) 0
Strategic Change Projects
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary 0 0 0 0 0 0 (137) (137) 0
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (138) (138) 0 (33,664) (33,664) 0 (91,292) (91,292) 0
01 TIF - Lorn/Kirk Road 0 0 0 (699) (699) 0 (2,717) (2,717) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (195) (195) 0 (6,493) (6,493) 0
HWD - FFE (Funded by LA) 0 0 0 0 0 0 (350) (350) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Strategic Change Total (138) (138) 0 (34,558) (34,558) 0 (103,812) (103,812) 0
Total Income (199) (245) 46 (40,036) (40,036) 0 (134,150) (134,150) 0
Net Total 3,754 3,777 (23) 48,555 29,319 19,236 177,387 177,521 (134)
Appendix 7
Full Year This Financial Year Total Project Costs
30 June 2022
Page 81

Page 82

MONITORING REPORT
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget
Year End
Forecast
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Flood Prevention 2 2 0 474 474 0 1,084 1,084 0
Coastal Protection 0 0 0 20 20 0 200 200 0
Coastal Change Adaptation 0 0 0 159 159 0 159 159 0
Bute Sea Wall Repairs 0 0 0 750 750 0 750 750 0
Helensburgh Flood Mitigation 0 0 0 432 432 0 432 432 0
Bridge Strengthening 29 29 0 1,349 1,349 0 2,049 2,049 0
Local Bridge Maintenance Fund 2 2 0 1,237 1,237 0 5,447 5,447 0
Roads Reconstruction 0 0 0 8,475 8,475 0 15,336 15,336 0
Roads Reconstruction - Helensburgh CHORD 0 0 0 47 47 0 47 47 0
Roads Reconstruction - Oban CHORD 0 0 0 3 3 0 3 3 0
Helensburgh CHORD - Signage etc 0 0 0 10 10 0 10 10 0
Lighting 0 0 0 740 740 0 1,040 1,040 0
Environmental Projects 0 0 0 734 734 0 934 934 0
Play Park Refurbishment 0 0 0 155 155 0 155 155 0
Public Convenience Upgrades 0 0 0 82 82 0 82 82 0
Footway Improvements 0 0 0 269 269 0 269 269 0
Glengorm - Capping 0 0 0 82 82 0 82 82 0
Glengorm - Cell and Transfer Station (PB) 18 18 0 560 560 0 560 560 0
EV Quick Chargers 0 0 0 93 93 0 93 93 0
Tobermory Car Park 52 52 0 951 951 0 951 951 0
Active Travel 0 0 0 500 500 0 500 500 0
Bin Replacement Programme 0 0 0 100 100 0 100 100 0
Server Sustainability 4 4 0 187 187 0 251 251 0
PC Replacement 445 445 0 522 522 0 522 522 0
Telecomms Network 2 2 0 98 98 0 98 98 0
Block Allocation - ICT 0 0 0 0 0 0 1,690 1,690 0
Asset Sustainability Total 554 554 0 18,029 18,029 0 32,844 32,844 0
Service Development Projects
Preliminary design for  Regional Transport projects 0 0 0 16 16 0 221 221 0
Campbeltown Old Quay 0 0 0 43 43 0 1,424 1,424 0
Fleet Management - Prudential Borrowing 0 0 0 2,187 2,187 0 4,861 4,861 0
Fleet Management 0 0 0 0 0 0 2,859 2,859 0
Lismore Ferry 13 19 (6) 13 19 (6) 666 672 (6)
Millpark Depot Demolition 0 0 0 0 0 0 126 126 0
Oban Depot Development Project 0 15 (15) 0 15 (15) 2,100 2,115 (15)
Lochgilphead Depot Rationalisation 0 0 0 (10) 0 (10) 19 29 (10)
Jackson's Quarry Refurbishment 0 0 0 (2) 0 (2) 283 285 (2)
Witchburn Road Demolition 0 0 0 (1) 0 (1) 157 158 (1)
Safe Streets, Walking and Cycling (CWSS) 0 0 0 544 544 0 2,878 2,878 0
SPT - bus infrastructure 0 0 0 0 0 0 1,405 1,405 0
Cycleways - H&L (FSPT) 0 0 0 240 240 0 3,112 3,112 0
Helensburgh Public Realm - Arts Strategy Fund 0 0 0 51 51 0 53 53 0
Town Centre Funds 286 287 (1) 1,054 1,055 (1) 3,876 3,877 (1)
Dunoon Cycle Bothy 7 7 0 266 266 0 279 279 0
Dunoon STEM Hub 10 10 0 603 603 0 608 608 0
Ardrishaig North Active Travel 0 0 0 880 880 0 880 880 0
Nature Restoration Fund 0 0 0 346 346 0 346 346 0
Gibraltar Street Public Realm Improvements 5 5 0 248 248 0 250 250 0
Hermitage Park 0 0 0 69 69 0 3,314 3,314 0
Applications Projects 94 94 0 757 757 0 2,883 2,883 0
Service Development Total 415 437 (22) 7,304 7,339 (35) 32,600 32,635 (35)
Strategic Change Projects
Campbeltown Flood Scheme 23 23 0 10,354 9,098 1,256 15,215 15,215 0
Street Lighting LED Replacement 0 0 0 791 791 0 3,900 3,900 0
Harbour Investment Programme 138 138 0 33,664 15,550 18,114 91,292 91,292 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - North Pier Extension 0 0 0 0 0 0 214 214 0
TIF - Oban Airport Business Park 0 0 0 101 101 0 590 590 0
TIF - Halfway House Roundabout 0 0 0 597 597 0 640 640 0
Strategic Change Total 161 161 0 45,508 26,138 19,370 114,021 114,021 0
Total Expenditure 1,130 1,152 (22) 70,841 51,506 19,335 179,465 179,500 (35)
INCOME
Asset Sustainability
EV Quick Chargers 0 0 0 (97) (97) 0 (97) (97) 0
Glengorm Capping/New Cell - Prudential Borrowing 0 0 0 (560) (560) 0 (560) (560) 0
Tobermory Car Park 0 0 0 (775) (775) 0 (775) (775) 0
Asset Sustainability Total 0 0 0 (1,432) (1,432) 0 (1,432) (1,432) 0
Service Development Projects
Applications Projects 0 0 0 (46) (46) 0 (437) (437) 0
Safe Streets, Walking and Cycling 0 0 0 (550) (550) 0 (2,483) (2,483) 0
SPfT 0 0 0 0 0 0 (1,243) (1,243) 0
Cycleways - H&L (FSPT) 0 0 0 (240) (240) 0 (3,212) (3,212) 0
Town Centre Funds 0 0 0 (382) (382) 0 (1,794) (1,794) 0
Dunoon STEM Hub 0 0 0 (100) (100) 0 (608) (608) 0
Ardrishaig North Active Travel (50) (50) 0 (50) (50) 0 (50) (50) 0
Dunoon Cycle Bothy 0 0 0 (209) (209) 0 (279) (279) 0
Gibraltar Street Public Realm Improvements 0 0 0 0 0 0 (250) (250) 0
Hermitage Park 0 0 0 0 0 0 (3,245) (3,245) 0
Fleet Management - PB 0 0 0 (2,187) (2,187) 0 (4,861) (4,861) 0
Fleet Management 0 (8) 8 0 0 0 0 0 0
Lochgilphead Depot Rationalisation 0 0 0 (1) (1) 0 (1) (1) 0
Millpark Depot Demolition Insurance 0 0 0 0 0 0 (53) (53) 0
Oban Depot - Mill Park Insurance Claim 0 0 0 0 0 0 (1,681) (1,681) 0
Oban Depot - Appin Depot Sale 0 0 0 (150) (150) 0 (150) (150) 0
Lismore Ferry (11) (11) 0 (131) (131) 0 (631) (631) 0
Witchburn Road Demolition 0 0 0 0 0 0 (157) (157) 0
Service Development Total (61) (69) 8 (4,046) (4,046) 0 (21,135) (21,135) 0
Strategic Change Projects
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (138) (138) 0 (33,664) (33,664) 0 (91,292) (91,292) 0
01 TIF - Lorn/Kirk Road 0 0 0 (699) (699) 0 (2,717) (2,717) 0
Strategic Change Total (138) (138) 0 (34,363) (34,363) 0 (94,279) (94,279) 0
Total Income (199) (207) 8 (39,841) (39,841) 0 (116,846) (116,846) 0
Net Departmental Total 931 945 (14) 31,000 11,665 19,335 62,619 62,654 (35)
30 June 2022
Full Year This Financial Year Total Project Costs
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR KIRSTY FLANAGAN
Appendix 7
Page 82

Page 83

MONITORING REPORT
Budget Actual Variance Budget Forecast Variance Budget Forecast Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability
Education 383 383 0 4,281 4,281 0 10,761 10,761 0
Live Argyll 21 68 (47) 1,227 1,283 (56) 2,086 2,142 (56)
Health and Social Care Partnership 0 0 0 2,053 2,055 (2) 2,922 2,924 (2)
Shared Offices 11 11 0 2,469 2,469 0 3,263 3,263 0
Asset Sustainability Total 415 462 (47) 10,030 10,088 (58) 19,032 19,090 (58)
Service Development Projects
Ardrishaig Primary Pre 5 Unit 0 0 0 0 0 0 2 2 0
Bowmore Primary School - Pre 5 Unit 0 0 0 0 0 0 149 149 0
Clyde Cottage - 600 hour provision 0 0 0 23 23 0 579 579 0
Craignish Primary School - Pre 5 Extension 0 0 0 0 0 0 400 400 0
Iona Primary School - Pre 5 Unit 0 0 0 0 0 0 490 490 0
Islay High and Rosneath Primary School Pitches 0 0 0 (12) 0 (12) 707 719 (12)
Lochgoilhead Primary School - Pre 5 Unit 0 0 0 0 0 0 391 391 0
Park Primary Extension/Pre Fives Unit 0 0 0 0 0 0 341 341 0
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 491 491 0
Bunessan Primary School - Gaelic Medium Improvements 0 0 0 0 0 0 120 120 0
Early Learning and Childcare 0 0 0 0 0 0 850 850 0
Early Learning and Childcare - 1140 Hours 254 254 0 1,036 1,036 0 7,751 7,751 0
CO2 Monitoring - Covid Mitigation in Schools 0 0 0 116 116 0 192 192 0
Early Learning and Childcare - 1140 Hours - CFCR 0 0 0 0 0 0 111 111 0
Bowmore Primary School - Gaelic Medium Grant 0 0 0 38 38 0 38 38 0
Riverside Leisure Centre Refurbishment 0 0 0 (13) 0 (13) 1,232 1,245 (13)
Dunclutha Childrens Home 0 0 0 54 54 0 1,300 1,300 0
Service Development Total 254 254 0 1,242 1,267 (25) 15,144 15,169 (25)
Strategic Change Projects
Campbeltown Schools Redevelopment 38 38 0 76 76 0 2,130 2,130 0
Dunoon Primary 257 257 0 304 304 0 10,869 10,869 0
Replacement of Oban High 96 96 0 136 136 0 3,250 3,250 0
Kirn Primary School 65 65 0 99 99 0 10,119 10,119 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Carbon Management Business Cases 0 0 0 60 60 0 261 261 0
NPDO Schools Solar PV Panel Installations 0 0 0 183 183 0 944 944 0
Non NPDO Schools Solar PV Panel Installations 0 0 0 88 88 0 488 488 0
Carbon Management Fuel Conversions 0 0 0 0 0 0 107 107 0
Carbon Management Capital Property Works 2016/17 0 0 0 20 20 0 39 39 0
Carbon Management - Group Heating Conversion Project 0 0 0 10 10 0 1,948 1,948 0
Kilmory Biomass  Carbon Management 0 0 0 0 0 0 956 956 0
Oil to Gas Heating Conversions 0 0 0 5 5 0 187 187 0
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 0 0 0 310 310 0 11,838 11,838 0
Clean Energy 0 0 0 551 567 (16) 729 745 (16)
Clean Energy 2022-23 0 0 0 500 500 0 500 500 0
CHORD Oban 0 0 0 651 651 0 7,905 7,905 0
CHORD - Helensburgh 0 0 0 28 28 0 6,557 6,557 0
CHORD Dunoon 2 2 0 55 55 0 12,522 12,522 0
Helensburgh Waterfront Deveopment 1,696 1,696 0 2,895 2,895 0 22,557 22,557 0
HWD - FFE (Funded by LA) 0 0 0 344 344 0 350 350 0
Kilmory Business Park Phase 2AA 0 0 0 141 141 0 150 150 0
Dunoon Pier OBC 0 0 0 0 0 0 2,844 2,844 0
Strategic Change Total 2,154 2,154 0 6,478 6,494 (16) 97,896 97,912 (16)
Total Expenditure 2,823 2,870 (47) 17,750 17,849 (99) 132,072 132,171 (99)
INCOME
Asset Sustainability
Education 0 0 0 0 0 0 0 0 0
Live Argyll 0 0 0 0 0 0 0 0 0
Asset Sustainability Total 0 0 0 0 0 0 0 0 0
Service Development Projects
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 (485) (485) 0
Bunessan Primary School - Gaelic Medium Improvements 0 0 0 0 0 0 (30) (30) 0
Early Learning and Childcare 0 0 0 0 0 0 (918) (918) 0
Early Years 1140 Hours 0 0 0 0 0 0 (6,300) (6,300) 0
CO2 Monitoring - Covid Mitigation in Schools 0 (38) 38 0 0 0 0 0 0
Bowmore Primary School - Gaelic Medium Grant 0 0 0 0 0 0 (38) (38) 0
Service Development Total 0 (38) 38 0 0 0 (7,771) (7,771) 0
Strategic Change
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary School 0 0 0 0 0 0 (137) (137) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (195) (195) 0 (6,493) (6,493) 0
HWD - FFE (Funded by LA) 0 0 0 0 0 0 (350) (350) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Strategic Change Total 0 0 0 (195) (195) 0 (9,533) (9,533) 0
Total Income 0 (38) 38 (195) (195) 0 (17,304) (17,304) 0
Net Departmental Total 2,823 2,832 (9) 17,555 17,654 (99) 114,768 114,867 (99)
30 June 2022
Total Project CostsFull Year This Financial YearCurrent Financial Year To Date
Appendix 7
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR DOUGLAS HENDRY
Page 83

Page 84

CAPITAL PLAN 2022-23 APPENDIX 8
Overall Summary
Service
Previous Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Education 36,575 6,097 4,843 2,226 0 0 49,741
Shared Offices 16,687 4,197 544 428 0 0 21,856
ICT 2,126 1,564 983 771 0 0 5,444
RIS 21,128 44,907 35,682 40,768 17,811 0 160,296
DEG 15,435 5,000 180 0 0 0 20,615
HSCP 1,246 2,107 441 428 0 0 4,222
Live Argyll 1,274 1,235 431 428 0 0 3,368
CHORD 48,486 4,114 285 0 0 0 52,885
Overall Total 142,957 69,221 43,389 45,049 17,811 0 318,427
Page 84

Page 85

CAPITAL PLAN 2022-23 APPENDIX 8
Education
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability Education Asbestos Control/Removal Works 0 7 0 0 0 0 7
Block Allocation - Education 0 3,216 4,231 2,226 0 0 9,673
Digital Inclusion 20-21 0 9 0 0 0 0 9
Free School Meals 0 14 0 0 0 0 14
Homeless Houses - Housing Quality Standard 0 1 0 0 0 0 1
Internal Refurbishment Budget 0 7 0 0 0 0 7
Lochgilphead Primary School Demolition 0 7 0 0 0 0 7
Pre-5's/Nurseries 0 1 0 0 0 0 1
Primary Schools 0 530 23 0 0 0 553
School Houses - Housing Quality Standard 0 26 0 0 0 0 26
Secondary Schools 0 463 0 0 0 0 463
Asset Sustainability Total 0 4,281 4,254 2,226 0 0 10,761
Service Development Education Ardrishaig Primar School - Pre Five Extension 2 0 0 0 0 0 2
Bowmore Primary School - Gaelic Medium Grant 0 38 0 0 0 0 38
Bowmore Primary School - Pre Five Unit 149 0 0 0 0 0 149
Bunessan Primary School - Gaelic Medium Improvements 120 0 0 0 0 0 120
Clyde Cottage - 600 hours provision 556 23 0 0 0 0 579
CO2 Monitoring - Covid Mitigation in Schools 76 116 0 0 0 0 192
Craignish Primary School - Pre Five Extension (600 hours funding) 400 0 0 0 0 0 400
Early Learning and Childcare 850 0 0 0 0 0 850
Early Learning and Childcare - 1140 Hours 6,696 1,036 19 0 0 0 7,751
Early Learning and Childcare - 1140 Hours - CFCR 111 0 0 0 0 0 111
Iona Primary School - Pre Five Unit (600 hours funding) 490 0 0 0 0 0 490
Islay High & Rosneath PS Pitches 719 -12 0 0 0 0 707
Lochgoilhead Primary School - Pre Five Unit (600 hours funding) 391 0 0 0 0 0 391
Park Primary Extension and Pre Fives Unit 341 0 0 0 0 0 341
Sandbank Gaelic Pre Five Unit 491 0 0 0 0 0 491
Service Development Total 11,392 1,201 19 0 0 0 12,612
Strategic Change Education Campbeltown Schools Redevelopment 2,054 76 0 0 0 0 2,130
Dunoon Primary School 10,365 304 200 0 0 0 10,869
Kirn Primary School 10,020 99 0 0 0 0 10,119
Replacement of Oban High School 2,744 136 370 0 0 0 3,250
Strategic Change Total 25,183 615 570 0 0 0 26,368
Overall Total 36,575 6,097 4,843 2,226 0 0 49,741
Page 85

Page 86

CAPITAL PLAN 2022-23 APPENDIX 8
Shared Office
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability Shared Offices Argyll House, Dunoon 0 12 0 0 0 0 12
Asbestos Capital Property Works 0 51 0 0 0 0 51
Block Allocation 0 0 236 398 0 0 634
Bowmore Area Office 0 76 0 0 0 0 76
Burnett Building 0 110 0 0 0 0 110
Capital Property Works 0 38 0 0 0 0 38
Fire Risk Assessment Works 0 14 0 0 0 0 14
Hill Street Dunoon Rewire 0 33 0 0 0 0 33
Kilmory Castle 0 1,368 43 0 0 0 1,411
Legionella Control Works 0 215 0 0 0 0 215
Manse Brae District Office 0 1 0 0 0 0 1
Manse Brae Roads Office 0 2 0 0 0 0 2
Our Modern Workspace 0 549 87 30 0 0 666
Asset Sustainability Total 0 2,469 366 428 0 0 3,263
Strategic Change Shared Offices Campbeltown Office Rationalisation 595 1 0 0 0 0 596
Carbon Management - Group Heating Conversion Project (Prudential Borrowing)1,938 10 0 0 0 0 1,948
Carbon Management Business Cases (FPB) 201 60 0 0 0 0 261
Carbon Management Capital Property Works 16/17 19 20 0 0 0 0 39
Carbon Management Fuel Conversions (FPB) 107 0 0 0 0 0 107
Cleaner Energy 0 551 178 0 0 0 729
Cleaner Energy 2022-23 0 500 0 0 0 0 500
Helensburgh Office Rationalisation  (FPB,REC) 11,528 310 0 0 0 0 11,838
Kilmory Biomass Project OBC (FPB,REV) 956 0 0 0 0 0 956
Non-NPDO Schools PV Panel Installations 400 88 0 0 0 0 488
NPDO Schools Solar PV Panel Installations 761 183 0 0 0 0 944
Oil to Gas Heating Conversions (FPB) 182 5 0 0 0 0 187
Strategic Change Total 16,687 1,728 178 0 0 0 18,593
Overall Total 16,687 4,197 544 428 0 0 21,856
Page 86

Page 87

CAPITAL PLAN 2022-23 APPENDIX 8
Major Projects
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Strategic Change CHORD CHORD - Dunoon 12,467 55 0 0 0 0 12,522
CHORD - Helensburgh -Public Realm Imprv 6,529 28 0 0 0 0 6,557
CHORD - Oban 7,254 651 0 0 0 0 7,905
Helensburgh Waterfront Development 19,377 2,895 285 0 0 0 22,557
HWD - FFE 6 344 0 0 0 0 350
Kilmory Business Park Phase 2AA 9 141 0 0 0 0 150
OBC for Dunoon Pier 2,844 0 0 0 0 0 2,844
Strategic Change Total 48,486 4,114 285 0 0 0 52,885
Overall Total 48,486 4,114 285 0 0 0 52,885
Page 87

Page 88

CAPITAL PLAN 2022-23 APPENDIX 8
ICT
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability ICT Block Allocation - ICT 0 0 919 771 0 0 1,690
PC Replacement 0 522 0 0 0 0 522
Server Sustainability 0 187 64 0 0 0 251
Telecomms Network 0 98 0 0 0 0 98
Asset Sustainability Total 0 807 983 771 0 0 2,561
Service Development ICT Applications Projects 2,126 757 0 0 0 0 2,883
Service Development Total 2,126 757 0 0 0 0 2,883
Overall Total 2,126 1,564 983 771 0 0 5,444
Page 88

Page 89

CAPITAL PLAN 2022-23 APPENDIX 8
Roads and Infrastructure Services
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability RIS Bin Replacement Programme 0 100 0 0 0 0 100
Bridge Strengthening 0 1,349 350 350 0 0 2,049
Bute Sea Wall Repairs 0 750 0 0 0 0 750
Coastal Change Adaptation 0 159 0 0 0 0 159
Coastal Protection 0 20 80 100 0 0 200
Environmental Projects 0 734 100 100 0 0 934
EV Quick Chargers 0 93 0 0 0 0 93
Flood Prevention 0 474 305 305 0 0 1,084
Footway Improvements 0 269 0 0 0 0 269
Glengorm - Capping 0 82 0 0 0 0 82
Glengorm - Cell and Transfer Station (PB) 0 560 0 0 0 0 560
Helensburgh CHORD - Signage etc 0 10 0 0 0 0 10
Helensburgh Flood Mitigation 0 432 0 0 0 0 432
Investment in Active Travel 0 500 0 0 0 0 500
Lighting 0 740 150 150 0 0 1,040
Local Bridge Maintenance Fund 0 1,237 4,210 0 0 0 5,447
Play Park Renewal 0 155 0 0 0 0 155
Public Convenience Upgrades 0 82 0 0 0 0 82
Roads Reconstruction 0 8,475 3,449 3,412 0 0 15,336
Roads Reconstruction - Helensburgh CHORD 0 47 0 0 0 0 47
Roads Reconstruction - Oban CHORD 0 3 0 0 0 0 3
Tobermory Car Park 0 951 0 0 0 0 951
Asset Sustainability Total 0 17,222 8,644 4,417 0 0 30,283
Service Development RIS Campbeltown Old Quay 1,381 43 0 0 0 0 1,424
Fleet Management 2,859 0 0 0 0 0 2,859
Fleet Management - Prudential Borrowing 2,674 2,187 0 0 0 0 4,861
Jackson's Quarry Refurbishment 285 -2 0 0 0 0 283
Lismore Ferry Replacement 618 13 15 20 0 0 666
Lochgilphead Depot Rationalisation 29 -10 0 0 0 0 19
Mill Park Depot Demolition 126 0 0 0 0 0 126
Oban Depot Development 2,100 0 0 0 0 0 2,100
Preliminary design for  Regional Transport projects (tif) 205 16 0 0 0 0 221
Witchburn Road Demolition 158 -1 0 0 0 0 157
Service Development Total 10,435 2,246 15 20 0 0 12,716
Strategic Change RIS Campbeltown Flood Scheme 878 9,098 3,908 1,331 0 0 15,215
Harbour Investment Programme PB 6,706 15,550 23,115 35,000 17,811 0 98,182
Street Lighting LED Replacement 3,109 791 0 0 0 0 3,900
Strategic Change Total 10,693 25,439 27,023 36,331 17,811 0 117,297
Overall Total 21,128 44,907 35,682 40,768 17,811 0 160,296
Page 89

Page 90

CAPITAL PLAN 2022-23 APPENDIX 8
Development and Economic Growth
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Service Development DEG Ardrishaig North Active Travel 0 880 0 0 0 0 880
Cycleways - H&L (FSPT) 2,722 240 150 0 0 0 3,112
Dunoon Cycle Bothy 13 266 0 0 0 0 279
Dunoon STEM Hub 5 603 0 0 0 0 608
Gibraltar Street Public Realm Improvements 2 248 0 0 0 0 250
Helensburgh Public Realm - Arts Strategy Fund 2 51 0 0 0 0 53
Hermitage Park 3,245 69 0 0 0 0 3,314
Nature Restoration Fund 0 346 0 0 0 0 346
Safe Streets, Walking and Cycling (CWSS) 2,334 544 0 0 0 0 2,878
SPT - bus infrastructure 1,405 0 0 0 0 0 1,405
Town Centre Funds 2,792 1,054 30 0 0 0 3,876
Service Development Total 12,520 4,301 180 0 0 0 17,001
Strategic Change DEG 01 TIF - Lorn/Kirk Road 2,169 1 0 0 0 0 2,170
05 TIF - North Pier Extension 214 0 0 0 0 0 214
09 TIF - Oban Airport Business Park 489 101 0 0 0 0 590
TIF - Halfway House Roundabout 43 597 0 0 0 0 640
Strategic Change Total 2,915 699 0 0 0 0 3,614
Overall Total 15,435 5,000 180 0 0 0 20,615 Page 90

Page 91

CAPITAL PLAN 2022-23 APPENDIX 8
Health & Social Care Partnership
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability HSCP Ardfenaig 0 125 0 0 0 0 125
Block Allocation 0 390 431 428 0 0 1,249
Capital Property Works 0 139 0 0 0 0 139
Digitalising telecare 0 100 0 0 0 0 100
Eadar Glinn 0 196 0 0 0 0 196
Glencruitten Hostel 0 36 0 0 0 0 36
Gortonvogie 0 80 0 0 0 0 80
Greenwood/Woodlands 0 224 0 0 0 0 224
Kilmory Castle Top Floor Toilet Refurb 0 -2 0 0 0 0 -2
Lochgilphead Resource Centre 0 16 0 0 0 0 16
Struan Lodge Boiler 0 252 0 0 0 0 252
Thomson Home Rothesay 0 125 0 0 0 0 125
Tigh An Rudha HFE 0 372 10 0 0 0 382
Asset Sustainability Total 0 2,053 441 428 0 0 2,922
Service Development HSCP Dunclutha Childrens Home 1,246 54 0 0 0 0 1,300
Service Development Total 1,246 54 0 0 0 0 1,300
Overall Total 1,246 2,107 441 428 0 0 4,222
Page 91

Page 92

CAPITAL PLAN 2022-23 APPENDIX 8
Live Argyll
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability Live Argyll Aqualibrium 0 28 0 0 0 0 28
Campbeltown Museum - Burnet Bldg 0 38 0 0 0 0 38
Capital Property Works 0 1,031 431 428 0 0 1,890
Inveraray CARS 0 21 0 0 0 0 21
Kintyre Community Education Centre - Lift Shaft Refurbishment 0 -12 0 0 0 0 -12
Lochgilphead Library Relocation 0 20 0 0 0 0 20
Riverside Leisure Centre - Cladding Upgrade 0 46 0 0 0 0 46
Riverside Leisure Centre - Spa Pool Upgrade 0 20 0 0 0 0 20
Rothesay Swimming Pool 0 27 0 0 0 0 27
The Moat Centre - Gym Store 0 -2 0 0 0 0 -2
Victoria Halls, Helensburgh 0 10 0 0 0 0 10
Asset Sustainability Total 0 1,227 431 428 0 0 2,086
Service Development Live Argyll Riverside Leisure Centre Refurbishment 1,245 -13 0 0 0 0 1,232
Service Development Total 1,245 -13 0 0 0 0 1,232
Strategic Change Live Argyll Carbon Management 29 21 0 0 0 0 50
Strategic Change Total 29 21 0 0 0 0 50
Overall Total 1,274 1,235 431 428 0 0 3,368
Page 92

Page 93

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 11 AUGUST 2022 
TREASURY MANAGEMENT MONITORING REPORT – 30 JUNE 2022 
1. EXECUTIVE SUMMARY 
1.1. This report sets out the Council’s treasury management position for the period 1 April
2022 to 30 June 2022 and includes information on: 
 Overall borrowing position
 Borrowing activity
 Investment activity
 Economic background
 Interest rate forecast
 Prudential Indicators 
1.2. Estimated borrowing is below the Capital Financing Requirement for the period to 30
June 2022, at this stage in the financial year capital expenditure is below target. Due
to delays caused by the COVID-19 pandemic capital expenditure has been relatively
low over the last twelve months however there is an expectation this will increase back
up again over 2022-23 which will continue to be monitored closely.  
1.3. The net movement in external borrowing in the period 1 April 2022 to 30 June 2022
was a decrease of £10.861m. 
1.4. The levels of investments were £117.9m at 30 June 2022. The rate of return achieved
was 1.351% which compares favourably with the target SONIA rate which was 
1.064%. 
1.5 The Council has significant cash balances which are invested in accordance with its
Annual Treasury Management Strategy on the basis of security first, liquidity second
and then return. The high cash levels are largely due to significant COVID-19 funding
received from the Scottish Government at the end of 2020-21 and in to 2021-22 which
the Council has committed for specific COVID-19 purposes in addition to slippage
within the capital programme resulting in a slower rate of spend. 
Page 93

Page 94

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 11 AUGUST 2022 
TREASURY MANAGEMENT MONITORING REPORT – 30 JUNE 2022 
2. INTRODUCTION 
2.1. This report sets out the Council’s treasury management position for the period 1
April 2022 to 30 June 2022 and includes information on: 
 Overall borrowing position
 Borrowing activity
 Investment activity
 Economic background
 Interest rate forecast
 Prudential Indicators 
3. DETAIL
Overall Borrowing Position 
3.1. The table below details the estimated capital financing requirement (CFR) and
compares this with the estimated level of external debt at 31 March 2022. The CFR
represents the underlying need for the Council to borrow to fund its fixed assets and
accumulated capital expenditure. 
Forecast Forecast Forecast  
2022/23 2023/24 2024/25  
£000 £000 £000
CFR at 1 April  309,092 333,454 348,569
Net Capital Expenditure 34,530 26,502 28,227
Less Loans Fund Principal Repayments (5,353) (5,507) (5,788)
Less: NPDO Repayment (4,815) (5,880) (6,038)
Estimated CFR 31 March  333,454 348,569 364,970
Less Funded by NPDO (116,681) (117,064) (112,184)
Estimated Net CFR 31 March  216,773 231,505 252,786
Estimated External Borrowing at 31
March 
212,431 236,654 256,650
Gap 4,342 (5,149) (3,864) 
Page 94

Page 95

3.2. Borrowing is below the Capital Financing Requirement for the period to 30 June 2022.
Whilst borrowing rates are still comparatively low the Council has significant cash
balances which reduces the need to borrow in the short term. 
3.3. The Council’s Treasury Management Strategy states that any decision to borrow in
advance will be within forward approved Capital Financing Requirement estimates. 
3.4. The Council’s estimated net capital financing requirement at 30 June 2022 is £216.8m.
The table below shows how this has been financed. £167.1m is funded by loans and
there are substantial internal balances of £167.6m of which £117.9m are currently
invested, as detailed in section 3.7, leaving a net internal balance of £49.7m. 
Position at
31/03/22
Position at
30/06/22  
£000 £000
Loans 177,934 167,072
Net Internal Balances -5,505 49,701
Total CFR 172,429 216,773 
3.5. During the period from 1 April to 30 June 2022, £10.892m of loans were repaid and 0.031m of
new borrowing was taken.  £10m of temporary borrowing had been taken out prior to the year-
end to fund short term cash flow pressures therefore this accounts for the majority of the loan
repayment figure. The analysis of the movement in borrowing is shown in the table below: 
Actual    
£000
External Loans Repaid 1st April 2022 to 30th June
2022 (10,892)
Borrowing undertaken  1st April 2022 to 30th June 2022 31
Net Movement in External Borrowing   (10,861) 
3.6. The table below summarises the movement in the level and rate of temporary
borrowing at the start and end of the period. 
£000 % Rate
Temp borrowing at 31st March 2022 10,500 0.22%
Temp borrowing at 30th June 2022 518 0.55% 
Page 95

Page 96

Investment Activity
3.8  The average rate of return achieved in the Council’s investments to 30 June 2022  was
1.351% compared to the SONIA (Sterling Overnight Index Average) rate for the same period
of 1.064% which demonstrates that the Council continues to achieve a reasonable rate
of return on its cash investments. At 30 June 2022 the Council had £117.9m of short
term investments at an average rate of 1.351%. The table below details the
counterparties that the investments were placed with, the maturity date, the interest rate
and the credit rating applicable for each counterparty. 
Counterparty Maturity Amount £000 Interest Rate Rating  S&P
Clydesdale Bank Instant 5,384 1.15% Short Term A-2, Long
Santander 180 Day 5,000 0.67% Short Term A-1, Long
Clydesdale Bank 20/09/2022 5,000 1.60% Short Term A-2, Long
AL Ryan Bank 02/08/2022 5,000 0.59% Short Term A-1, Long
Toronto Dominion Bank 13/10/2022 5,000 0.50% Short Term A-1+,
Close Bros 29/07/2022 2,500 0.55% Short Term A-1, Long
National Bank of Kuwait 11/04/2023 7,500 2.08% Short Term A-1, Long
National Bank of Kuwait 17/11/2022 5,000 1.70% Short Term A-1, Long
Qatar National Bank 21/10/2022 5,000 1.49% Short Term A-1, Long
Qatar National Bank 13/12/2022 5,000 1.94% Short Term A-1, Long
Qatar National Bank 10/11/2022 5,000 1.67% Short Term A-1, Long
AL Ryan Bank 07/12/2022 5,000 1.70% Short Term A-1, Long
FADB 10/08/2022 5,000 0.24% Short Term A-1+,
FADB 20/01/2023 5,000 1.00% Short Term A-1+,
FADB 10/05/2023 5,000 2.11% Short Term A-1+,
London Borough of Croydon 22/07/2022 5,000 1.65% AA
London Borough of Croydon 22/08/2022 2,500 1.65% AA
Rotherham Metropolitan Borough Council 10/10/2022 7,500 0.90% AA
Slough Borough Council 26/05/2023 5,000 2.10% AA
Cheshire West & Chester Council 12/01/2023 2,500 0.90% AA
Slough Borough Council 29/06/2023 5,000 2.10% AA
MMF - BNP Paribas Call 9,000 1.24% AAA
MMF - Legal and General Call 6,000 1.10% AAA
Total 117,884 
Page 96

Page 97

3.9 All investments and deposits are in accordance with the Council’s approved list of
counterparties and within the limits and parameters defined in the Treasury
Management Practices. The counterparty list is constructed based on assessments
by leading credit reference agencies adjusted for additional market information
available in respect of counterparties. 
3.10 The Council has significant cash balances which are invested in accordance with its
Annual Treasury Management Strategy. This is largely due to significant COVID-19
funding received from the Scottish Government at the end of 2020-21and in to 2021-
22 which the Council has committed for specific COVID-19 purposes. These cash
balances are in excess of what is required for normal operating purposes but the
economic environment for investments has improved over the last few months with an
increase in interest rates, making investing these monies easier than in previous
years.
Economic and Interest Rate Forecasts 
3.11 The latest economic background is shown in Appendix 1 with the interest rate forecast
in Appendix 2.
Prudential Indicators 
3.12 The prudential indicators for 2022-23 are attached in Appendix 3. 
4. CONCLUSION 
4.1 In the period from 1 April 2022 to 30 June 2022, the Council’s borrowing decreased
by £10.861m, it is currently below the Capital Financing Requirement. There are
substantial internal balances, of which £117.9m is currently invested. The investment
returns were 1.351% which is above the SONIA target of 1.064%. 
5. IMPLICATIONS 
5.1 Policy –       None.  
5.2 Financial –      Complies with Annual Treasury Strategy.
5.3  Legal –       None.
5.4 HR –       None.
5.5 Fairer Duty Scotland –     None. 
5.5.1 Equalities – protected characteristics –  None.
5.5.2 Socio-economic Duty –    None.
5.5.3 Islands –      None.
5.6  Climate Change –     None.
5.7 Risk –       None.
5.8 Customer Service –     None. 
Kirsty Flanagan
Section 95 Officer
8 July 2022 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
Page 97

Page 98

Appendix 1 – Economic Background
Appendix 2 – Interest Rate Forecast
Appendix 3 – Prudential Indicators 
For further information contact Anne Blue, Head of Financial Services 
anne.blue@argyll-bute.gov.uk
Page 98

Page 99

Appendix 1 – Economics Update (at 06-07-22)
This section has been provided by Link Asset Services and therefore includes their views
and opinions of future trends and events. 
 The second quarter of 2022 saw:
 GDP fall by 0.1% m/m in March and by 0.3% m/m in April;
 An easing rather than a collapse in the composite Purchasing Managers Index (PMI); 
 A further rise in Consumer Price Index (CPI) inflation to a new 40-year high of 9.1% in May; 
 The first signs that the weakening in economic activity is filtering into a slightly looser labour
market;
 Bank Rate rise to 1.25%, taking it to its highest level since the Global Financial Crisis;
 Gilt yields caught up in the global surge in bond yields triggered by May’s strong rise in US
inflation;
 Rising global bond yields and concerns over growth drive a global sell-off in equity markets.
 Following the 0.1% m/m fall in GDP in March and the 0.3% m/m contraction in April, the
economy is now moving towards a recession (two quarters of falling output in a row). Indeed,
GDP would need to rise by 0.4-0.5% m/m in both May and June to prevent the economy from
contracting in Q2 as a whole. That said, without the joint wind down of the COVID-19 Test and
Trace and vaccination programme, GDP would have risen by 0.2% m/m and 0.1% m/m in
March and April respectively. That’s hardly strong, but it suggests the underlying momentum is
not quite as weak as the headline figures imply. 
 There is not much evidence that higher inflation and higher interest rates have yet become a
big drag on activity. Services output did fall by 0.3% m/m in April. But output in consumer-
facing services, conversely, rose by a solid 2.3% m/m in April. And although the Office for
National Statistics (ONS) said that some of the 1.0% m/m fall in manufacturing output was
linked to the drag on activity from higher prices, it also said that some of the 0.4% m/m drop in
construction output in April was a drop back after the boost in the wake of February’s Storm
Eunice. 
 The fact that the composite PMI didn’t fall in June also suggests that in Q2 (Apr – June) real
GDP has softened rather than collapsed. The S&P Global/CIPS all-sector PMI for June was
unchanged from its level of 53.1 in May, signalling tepid but positive growth. According to the
Lloyd’s barometer, business confidence in May also remained remarkably resilient. 
 Despite the fall in the GfK composite measure of consumer confidence to a new record low of -
41 in June, April’s £1.4bn rise in consumer credit suggests households appear to have turned
to credit to support their spending as the cost-of-living squeeze has intensified. Meanwhile, the
household saving rate held steady at 6.8% in Q1 in line with its long-term average and we
expect households to lower their saving rate further when the bigger falls in real incomes come
in Q2 and Q3 to cushion the blow to spending. 
 The Chancellor’s latest fiscal support of £10.3bn (0.5% of GDP), which comprised £15.3bn of
handouts to households, partly funded by a £5bn tax on the profits of oil and gas producers,
will help support GDP in the second half of the year. And with the Prime Minister and the
Chancellor desperately needing to boost their popularity, some tax cuts may be announced in
the Autumn Budget. 
Page 99

Page 100

 There has been early signs that the recent weakening in economic activity is filtering through
into a slightly looser labour market. The unemployment rate edged up from 3.7% in the three
months to March to 3.8%. The single-month data showed that employment fell by 254,000 in
April and the unemployment rate rose from 3.5% to 4.2%. And the upward march in the
number of job vacancies slowed, with the three-month average only rising from 1.296m in April
to 1.300m in May. A seasonal adjustment of the single-month data implies that vacancies fell
in May for the first time since COVID-19 was rife in December. 
 At the same time, a 1.8% m/m fall back in average earnings in April meant that the 3myy rate
of earnings eased from 7.0% in March to 6.8% in April. And a lot of the 0.5% m/m rise in
earnings excluding bonuses was probably due to the 6.6% rise in the National Living Wage on
1st April. The 3myy rate of earnings excluding bonuses stayed at 4.2%. 
 That said, conditions in the labour market remain exceptionally tight. The unemployment rate
is still close to its recent 47-year low, and there is the same number of unemployed people as
job vacancies and at 6.8% in April, the 3myy rate of average earnings is at a 10-year high
(although it is still falling in real terms) and is well above the 3.0-3.5% that is broadly consistent
with the 2.0% inflation target (assuming that productivity growth is 1.0-1.5%).  
 CPI inflation rose from 9.0% in April to a new 40-year high of 9.1% in May and it is not yet
close to its peak. The increase in CPI inflation in May was mainly due to a further leap in food
price inflation from 6.7% to a 13-year high of 8.5%. With the influence of increases in
agricultural commodity prices yet to fully feed into prices on the supermarket shelves, we think
that food price inflation will rise above 10% in September. And with two-thirds of the
observation period for the Ofgem price cap having now passed, something like a 40% rise in
utility prices is pretty much baked in the cake for October. The further rise in core producer
price inflation, from 13.9% to 14.8%, suggests that core goods CPI inflation will probably rise
to 14% before long. We think that will take CPI inflation to a peak of around 10.5% in October. 
 The rise in services CPI inflation from 4.7% in April to 4.9% in May suggests that domestic
price pressures are still strengthening. 
 There now seems to be an even greater likelihood that second-round effects, whereby high
inflation feeds back into higher price and wage expectations, keep inflation higher for longer.
For some time, the Monetary Policy Committee (MPC) has placed a lot of weight on the results
of the Bank of England’s monthly Decision Maker Panel which asks businesses how they
expect to change their prices and wages over the next year. May’s survey revealed that
businesses still expect to raise their selling prices by 6.0% and their wages by 4.8% over the
next year. Meanwhile, XpertHR said that pay settlements across the economy stayed at a 30-
year high of 4.0% in May. The government appears to be contemplating raising public sector
pay by up to 5%. And the 7.1% pay rise granted to some railway workers sets a high bar for
the negotiations that led to train strikes across large parts of the country in mid-June. 
 The MPC has now increased interest rates five times in as many meetings and raised rates to
their highest level since the Global Financial Crisis. Even so, coming after the Fed raised rates
by 75 basis points (bps) in June and a handful of other central banks have recently raised
rates by 50bps, the Bank of England’s action is relatively dovish. The MPC’s decision not to
follow the Fed and raise rates by more makes some sense. The UK’s status as a larger
importer of commodities, which have jumped in price, means that households in the UK are
now facing a much larger squeeze on their real incomes. 
 But the MPC’s new guidance is that if there are signs of “more persistent inflationary
pressures” it will, “if necessary act forcefully in response”. We expect the MPC to continue to
Page 100

Page 101

raise rates in steps of 25bps rather than 50bps. We think the MPC will raise rates from 1.25%
now to a peak of 2.75% next year. That’s higher than the peak of 2.00% forecast by
economists, but lower than the peak priced into the financial markets. 
 Gilt yields have been caught up in the global surge in bond yields triggered by the surprisingly
strong rise in CPI inflation in the US in May. The rises in two-year gilt yields (to a peak of
2.37% on 21st June) and 10-year yields (to a peak of 2.62%) took them to their highest level
since 2008 and 2014 respectively. And in response to signs that central banks (particularly the
US Fed) are going to raise interest rates faster to get on top of inflation, we now think that 10-
year gilt yields will reach a peak of 2.70% (up from 2.39% currently) this year and into 2023. 
 While the S&P 500 is 8.4% below its level a month ago, the FTSE 100 is 5.7% below it. Part of
the sell-off has been driven by the rapid rise in global bond yields and the resulting downward
pressure on equity valuations as well as concerns over economic growth. 
 Finally, the pound has already weakened from $1.37 and €1.21 earlier this year to $1.21 and
€1.16. A lot of these moves have been driven by concerns over the outlook for the global
economy and the resulting poor performance of risky assets, which has increased the demand
for the dollar relative to sterling. If interest rates rise faster and further in the US than in the UK,
rate differentials and a worsening in risk appetite will push the pound even lower, from $1.21
now to $1.18 by the end of 2022. We don’t expect the pound to fall by as much against the
euro (from €1.16 to €1.14 next year). But once global inflation and global interest rates peak,
the pound will probably benefit from the return of risk appetite. It may rise to $1.25 by the end
of 2023 and to $1.30 by the end of 2024. 
MPC meetings 5th May and 16th June 2022 
 After the Bank of England became the first major western central bank to put interest rates up
in this upswing in December, it has quickly followed up its first 0.15% rise by a further four
0.25% rises to 1.25%, in what is very likely to be a series of increases repeated throughout the
rest of 2022 and into 2023. 
 In May, the MPC voted 6-3 vote in favour of a 0.25% increase, but not only was this the first
time in its 25-year history that the MPC had raised rates at four meetings in a row but also
three members (Haskel, Mann and Saunders) wanted a 0.5% hike (up from none in March). 
However, GDP growth was forecast to drop to -0.25% in 2023 (+1.25% previously) and only
+0.25% in 2024 (+1.00% previously).  Anyone for a recession? 
 Nonetheless, over Q2, it is clear central banks in the developed economies have placed the
dampening down of inflation pressures front and centre of their primary objectives, even if it
comes at the cost of sluggish growth or, indeed, recession (mild ideally but it is very difficult to
micro-manage economic performance).  The Monetary Policy Committee (MPC) is in step with
this approach although, arguably, the UK economy is dragging its feet to a greater extent than
that seen in the US.   
 What are the key factors for consideration?  First, the CPI measure of inflation is already at
9.1%, and the Bank of England anticipates it will peak near to 11% just before Christmas. 
With the cost-of- living squeeze in full swing by that juncture, and unemployment likely to be
ticking upwards, we judge that the Bank will pause following its March 2023 meeting and judge
it has done enough so long as inflation starts to fall, albeit at a slow pace.  To that extent, we
can envisage the MPC waiting a full year before loosening the reins and starting to cut Bank
Rate in spring 2024. However, given the number of geopolitical factors that could push this
forecast off track, we would caution against taking a strong view on how interest rate
Page 101

Page 102

movements evolve and instead focus on optimising balance sheet management and the risk
management of investment and debt portfolios. 
 Regarding gilt yields, all developed economies have seen a considerable uplift in government
bond yields across the whole curve since the start of 2022 and, in many ways, gilts have
simply played catch-up of late.  To that end, we have revised our PWLB forecasts upward and
you will even see we have a 3.7% PWLB rate projected for the 25-year part of the curve in
both 2022 and 2023.  However, as headline inflation falls back, we project a slow reduction in
gilt yields as investors acknowledge that price pressures are gradually coming under control. 
 At the 16th June MPC meeting, part of the reason for the Committee only seeing a 0.25% hike
as necessary is the prevailing weak economic data.  The vote was again 6-3 (the same as in
May) but the words were more hawkish with the Bank strengthening its forward guidance.  It
deleted the previous phrase that “some degree of further tightening…may still be appropriate”
and replaced it with “the scale, pace and timing of any further increases in Bank Rate will
reflect the Committee’s assessment of the economic outlook and inflationary pressures” and
that “the Committee will be particularly alert to indications of more persistent inflationary
pressures, and will, if necessary, act forcefully in response.” 
 Whereas in May two members objected to the guidance that rates will rise further, it appears
that all members are behind this new, stronger guidance.  However, the growing evidence that
firms’ price and wage expectations have become dislodged from the 2.0% target suggest that
the Bank is between a rock and a hard place in navigating the appropriate monetary policy
response.  As always, the economic data will be key to anticipating whether our assumptions
remain sound. 
Page 102

Page 103

Appendix 2 – Interest Rate Forecast 
The Council has appointed Link Group as its treasury advisors and part of their service is to
assist the Council to formulate a view on interest rates. The PWLB rate forecasts below are
based on the Certainty Rate (the standard rate minus 20 bps) which has been accessible to
most authorities since 1st November 2012. 
The latest forecast on 21st June is compared below to the previous forecast (10th May).  A
comparison of these forecasts shows that PWLB rates have increased generally and show
a speed up in the rate of increase in Bank Rate as inflation is now posing a greater risk.
The increase in PWLB rates reflects a broad sell-off in sovereign bonds internationally as
inflation concerns abound.  To that end, the MPC has tightened short-term interest rates
with a view to trying to slow the economy sufficiently to keep the secondary effects of
inflation – as measured by wage rises – under control, but without pushing the economy
into recession.  
Our current and previous PWLB rate forecasts below are based on the Certainty Rate (the
standard rate minus 20 bps) which has been accessible to most authorities since 1st
November 2012. 
 LIBOR and LIBID rates ceased for new contracts at the end of 2021. In a continuation
of our previous forecasts, our money market yield forecasts are based on expected
average earnings by local authorities for 3 to 12 months.
 Our forecasts for average earnings are averages i.e., rates offered by individual banks
may differ significantly from these averages, reflecting their different needs for
borrowing short-term cash at any one point in time. 
A SUMMARY OVERVIEW OF THE FUTURE PATH OF BANK RATE
 Our central forecast for interest rates was last updated on 21st June and reflected a
view that the MPC will be keen to further demonstrate its anti-inflation credentials by
delivering a 0.25% increase in Bank Rate in August, September, November,
December, February and March i.e., the next six MPC meetings.
Link Group Interest Rate View 21.06.22
Sep-22 Dec-22 Mar-23 Jun-23 Sep-23 Dec-23 Mar-24 Jun-24 Sep-24 Dec-24 Mar-25 Jun-25
BANK RATE 1.75 2.25 2.75 2.75 2.75 2.75 2.50 2.50 2.25 2.25 2.25 2.25
3 month ave earnings 2.00 2.50 2.80 2.80 2.80 2.80 2.60 2.50 2.30 2.30 2.20 2.20
6 month ave earnings 2.50 2.80 3.00 3.00 2.90 2.90 2.80 2.70 2.60 2.50 2.40 2.30
12 month ave earnings 3.10 3.20 3.20 3.20 3.00 2.90 2.80 2.60 2.50 2.40 2.40 2.40
5 yr   PWLB 3.20 3.30 3.30 3.30 3.30 3.20 3.10 3.00 3.00 3.00 2.90 2.90
10 yr PWLB 3.40 3.50 3.50 3.50 3.50 3.40 3.30 3.20 3.20 3.20 3.10 3.10
25 yr PWLB 3.70 3.70 3.70 3.70 3.70 3.70 3.60 3.50 3.50 3.40 3.40 3.30
50 yr PWLB 3.40 3.40 3.50 3.50 3.40 3.40 3.30 3.20 3.20 3.10 3.10 3.00
Link Group Interest Rate View 10.5.22
Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 Sep-23 Dec-23 Mar-24 Jun-24 Sep-24 Dec-24 Mar-25 Jun-25
BANK RATE 1.25 1.50 1.75 2.00 2.00 2.00 2.00 2.00 1.75 1.75 1.75 1.75 1.75
3 month ave earnings 1.20 1.50 1.70 2.00 2.00 2.00 2.00 2.00 1.70 1.70 1.70 1.70 1.70
6 month ave earnings 1.60 1.90 2.10 2.20 2.20 2.20 2.20 2.10 2.00 1.90 1.90 1.90 1.90
12 month ave earnings 2.00 2.20 2.30 2.40 2.40 2.30 2.30 2.20 2.20 2.10 2.10 2.10 2.10
5 yr   PWLB 2.50 2.50 2.60 2.60 2.60 2.60 2.60 2.60 2.50 2.50 2.50 2.50 2.50
10 yr PWLB 2.80 2.80 2.90 2.90 2.90 2.90 2.90 2.90 2.80 2.80 2.80 2.80 2.80
25 yr PWLB 3.00 3.10 3.10 3.20 3.20 3.20 3.10 3.10 3.00 3.00 3.00 3.00 3.00
50 yr PWLB 2.70 2.80 2.80 2.90 2.90 2.90 2.80 2.80 2.70 2.70 2.70 2.70 2.70
Page 103

Page 104

 The CPI measure of inflation is now forecast to rise to close to 11% in Q4 2022 and the
MPC will be keen to stifle the prospect of average earnings data (6.8% y/y currently
including bonuses) providing further upside risk to inflationary factors that are primarily
being driven by supply-side shortages. 
 When Bank Rate reached 1% in May, the MPC indicated (no earlier than August) that it
will also consider the extent to which it implements Quantitative Tightening (QT),
primarily the selling of its gilt holdings. However, they are likely to take any such
decision cautiously as they are already not refinancing maturing debt.
 Notwithstanding the MPC’s clear desire to increase Bank Rate throughout 2022,
negative real earnings, the 54% hike in the Ofgem energy price cap from April (to be
followed by a potential 40%+ further increase from October), at the same time as
employees (and employers) have incurred a 1.25% Health & Social Care Levy, growing
commodity and food inflation plus council tax rises - all these factors will hit
households’ finances hard.  However, lower income families will be hit
disproportionately hard despite some limited assistance from the Chancellor to
postpone the full impact of rising energy costs.
 Given the above outlook, it poses a question as to whether the MPC may shift into
protecting economic growth if it flatlines or contracts through 2022.  Accordingly, we
remain tentative about whether the MPC will increase Bank Rate as far as the market
is currently pricing in (3.25% in April 2023).
 In the upcoming months, our forecasts will be guided not only by economic data
releases and clarifications from the MPC over its monetary policies, but the on-going
conflict between Russia and Ukraine, including the manner in which the West and
NATO respond through sanctions and/or military intervention.  Currently, oil, gas,
wheat and other mainstream commodities have risen significantly in price and central
banks will have to balance whether they prioritise economic growth or try to counter
supply-side shock induced inflation. 
 On the positive side, consumers are estimated to be sitting on over £160bn of excess
savings left over from the pandemic so that will cushion some of the impact of the
above increases.  However, most of those are held by more affluent people whereas
lower income families already spend nearly all their income before these increases hit
and have few financial reserves. 
PWLB RATES
 The yield curve has steepened considerably through the quarter and PWLB 5 to 50
years Certainty Rates are, generally, in the range of 2.75% to 3.75%.
 We view the markets as having built in, already, nearly all the effects on gilt yields of
the likely increases in Bank Rate and the poor inflation outlook (although we thought
that in May and markets went much further than expected in respect of the gilt market
sell-off).
 It is difficult to say currently what effect the Bank of England starting to sell gilts will
have on gilt yields now that Bank Rate has gone to above 1%.  Nothing will be decided
before August, however, but the Bank is likely to act cautiously as it has already started
on not refinancing maturing debt.  A pure roll-off of the peak £875bn gilt portfolio by not
refinancing bonds as they mature, would see holdings fall to about £415bn by 2031,
which would be about equal to the Bank’s pre-pandemic holding. 
 Increases in US treasury yields over the next few months could add further upside
pressure on gilt yields as they have done since the turn of the year.
Page 104

Page 105

Appendix 3 – Prudential Indicators 
PRUDENTIAL INDICATOR 2022-23 2022-23 2023-24 2024-25
(1).  EXTRACT FROM BUDGET          
Forecast
Outturn
Original
Estimate
Forecast
Outturn
Forecast
Outturn
Capital Expenditure £'000 £'000 £'000 £'000    
Non - HRA 34,530 51,699 26,502 28,227    
TOTAL 34,530 51,699 26,502 28,227          
Ratio of financing costs to net revenue stream          
Non - HRA 2.70% 2.70% 4.56% 4.57%        
Net borrowing requirement          
brought forward 1 April * 309,092 292,303 333,145 348,569    
carried forward 31 March * 333,454 333,145 348,569 364,970    
in year borrowing requirement 24,362 40,842 15,424 16,401     
In year Capital Financing Requirement   
Non - HRA 24,362 40,842 15,424 16,401    
TOTAL 24,362 40,842 15,424 16,401     
Capital Financing Requirement as at 31 March   
Non - HRA 333,454 333,145 348,569 364,970    
TOTAL 333,454 333,145 348,569 364,970                             
Page 105

Page 106

PRUDENTIAL INDICATOR 2022-23 2023-24 2024-25
(2).  TREASURY MANAGEMENT PRUDENTIAL
INDICATORS
£'M £'M £'M       
Authorised limit for external debt -     
borrowing 228 252 272    
other long term liabilities 120 121 116     
TOTAL 348 373 388     
Operational boundary for external debt -     
borrowing 223 247 267     
other long term liabilities 117 118 113     
TOTAL 340 365 380     
Upper limit for fixed interest rate exposure   
Principal re fixed rate borrowing  190% 190% 190%     
Upper limit for variable rate exposure   
Principal re variable rate borrowing  60% 60% 60%     
Upper limit for total principal sums invested for over 364
days
£20m £20m £20m     
(per maturity date)     
Maturity structure of new fixed rate borrowing during 2022/23
under 12 months       
12 months and within 24 months
24 months and within 5 years
5 years and within 10 years
10 years and above
upper limit lower limit
30% 0%
30% 0%
30% 0%
40% 0%
100% 0%
Page 106

Page 107

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 11 AUGUST 2022
RESERVES AND BALANCES – UPDATE AS AT 30 JUNE 2022 
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to advise Members of the overall level of
reserves held by the Council as well as providing detail on the monitoring of the
earmarked balances held within the General Fund. 
1.2 The Council has a total of £364.558m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
1.3 At 31 March 2022 the Council had a total of £103.626m of usable reserves.  Of
this:
• £2.682m relates to the Repairs and Renewals Fund
• £4.414m relates to Capital Funds
• £96.530m was held in the General Fund, with £89.433m of this balance
earmarked for specific purposes.
1.4 Of the earmarked balance of £89.433m: 
• £46.923m is invested or committed for major initiatives/capital projects
• £37.089m is still to be drawn down in 2022-23
• £5.421m is planned to be spent in future years 
Appendix 1 provides further information on the unspent budget earmarkings and
Appendix 2 provides further information on the COVID earmarkings. 
1.5 The Council’s General Fund contingency level is set at 2% of net expenditure for
2022-23 which equates to £5.256m.  At the beginning of the financial year there
was £1.841m of unallocated General Fund Balance (over and above contingency). 
At the Council meeting on 24 February 2022 it was agreed that the budgeted
revenue surplus of £2.482m would be transferred into the general fund. After taking
this into consideration and the current forecast outturn for 2022-23, the Council is
estimated to have a £4.323m surplus over contingency. 
Page 107

Page 108

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 11 AUGUST 2022
RESERVES AND BALANCES - UPDATE AS AT 30 JUNE 2022 
2. INTRODUCTION 
2.1 This report outlines current balances on the Council’s reserves, both usable and
unusable. It also provides detail on the monitoring of the earmarked balances
within the General Fund.   
3. DETAIL 
3.1 Types of Reserves 
3.1.1 Usable Reserves - Councils have powers to establish certain resource backed
reserves which can be used to fund expenditure.  The powers of councils to
establish reserves are laid out in Schedule 3 of the Local Government
(Scotland) Act 1975.  These allow councils to establish a Renewal and Repairs
Fund, Insurance Fund and Capital Fund. Councils can also establish a Useable
Capital Receipts Reserve.  The Council must also maintain a General Fund and
can earmark balances for specific purposes within the General Fund. 
3.1.2 Unusable Reserves – Councils are also required to establish certain reserves
that are not backed by resources. They are required purely for accounting
purposes and do not represent resources available for councils to utilise. The
Pensions Reserve, Revaluation Reserve, Capital Adjustment Account, Financial
Instruments Adjustment Account and Accumulated Absences Account are
examples of unusable reserves. 
3.2 Reserve Balances at 31 March 2022 
3.2.1 The balances on each type of reserve at 31 March 2022 are set out in the two
tables below, per the Unaudited Accounts for 2021-22. 
Unusable Reserves £000
Revaluation Reserve 145,903
Capital Adjustment Account 223,147
Financial Instruments Adjustment Account (2,198)
Pensions Reserve 4,634
Accumulated Absences Account (6,928)
Total Unusable Reserves 364,558 
Usable Reserves £000
Repairs and Renewals Fund 2,682
Capital Fund and Usable Capital Receipts Reserve 4,414                                                                                                                
General Fund  96,530
Total Usable Reserves  103,626
Total Reserves  468,184 
Page 108

Page 109

3.2.2 The Revaluation Reserve represents the unrealised gains in the valuation of
fixed assets. The Capital Adjustment Account represents the difference
between depreciation based on proper accounting practice and statutory
charges for financing capital expenditure. The Financial Instruments Adjustment
Account represents the difference between gains and losses on borrowing and
statutory capital financing charges. The Pensions Reserve represents the
difference between pension costs based on proper accounting practice and
payments made for pension costs. The Accumulated Absences Account
represents the costed difference between holiday pay entitlement and actual
holidays taken at 31 March. 
3.2.3 The Repairs and Renewals Fund was established to support funding of renewal
and replacement of school equipment.  Schools can only draw on the Repairs
and Renewals Fund to the extent they have previously paid into the Fund and
contributions must be contained within schools devolved budgets. 
3.2.4 The Capital Fund was established to receive all capital receipts generated by
the Council and can be used to support the capital plan or meet the principal
repayments on loan charges. The Council decides as part of the budget
process each year how it wishes to draw funding from the Capital Fund. 
3.2.5 The Usable Capital Receipts Reserve relates to the accumulated unspent
capital receipts from sale of council houses prior to transfer of the housing
stock. The reserve forms part of the Council’s Strategic Housing Fund and can
only be used for investment in social housing. The reserve will be used in
accordance with the approach to investing in housing agreed by the Council in
August 2012. 
3.3 General Fund 
3.3.1 The General Fund balance at 31 March 2022 can be analysed as follows: 
Balance
31/03/22
£000
Balance on General Fund as at 31 March 2021 78,245
Increase to General Fund balance at end of 2021-22 18,285
Earmarked Balances (89,433)
Contingency allowance at 2% of net expenditure (5,256)
Unallocated balance as at 31 March 2022 1,841 
3.3.2 The General Fund includes balances that the Council has agreed to earmark for
specific purposes. Some of these earmarked balances will be spent during the
current financial year and some of them will be held over and spent in later
years. The table below shows the balance at 31 March 2022, the amounts that
are currently invested or set aside for major initiatives, the amount already
spent and planned to be spent in the current year, the amount to be spent in
future years and any sums no longer required to be earmarked. Appendix 1
provides further details on the breakdown of unspent budget earmarkings. 
Page 109

Page 110

Officers have reviewed and updated the spending profiles. Appendix 2 provides
further details on the breakdown of COVID reserves. 
3.4 Unallocated General Fund Balance 
3.4.1 The Council’s General Fund contingency is set at 2% of net expenditure for
2022-23 and amounts to £5.256m.  At the beginning of the financial year there
was £1.841m of unallocated General Fund Balance (over and above
contingency).   After taking into consideration the budgeted allocation to the
General Fund agreed by Council on 24 February 22 and the balanced forecast
Earmarking
Category
Balance
31/03/2022 -
per year
end
published
report
Transfers
between
categories
Invested or
committed
for major
initiatives
/capital
projects
Drawn-
down to
2022-23
Budget as
at 30/06/22
Still to be
drawn-
down in
2022-23
Planned
Spend
Future
Years
Balance no
Longer
Required
£000 £000 £000 £000 £000 £000 £000
Strategic Housing
Fund 6,590 6,590
Investment in
Affordable
Housing
3,300 3,300
Capital Projects 24,722 24,722
Lochgilphead and
Tarbert
Regeneration
2,271 2,271
Support for Rural
Growth Deal 1,058 1,058
Asset
Management
Investment
2,607 2,607
Piers and
Harbours
Investment Fund
1,643 1,643
Scottish
Government
Initiatives
3,141 2,774 367
CHORD 349 150 199
DMR Schools 1,982 1,982
Energy Efficiency
Fund 218 218
Existing Legal
Commitments 475 475
Unspent Grant 12,834 950 11,432 452
Unspent Third
Party Contribution 166 166
Previous Council
Decision - Other 4,343 -55 2,125 2,163
Redundancy
Provision 1,732 500 1,232
Supporting
Organisational
Change
1,588 500 1,088
Spend to Save
Route
Optimisation
100 100
Timing Delay 499 499
Hermitage Park 4 4
COVID-19 9,407 257 9,150
Unspent Budget 10,404 55 1,400 6,976 2,083
Totals 89,433 0 46,923 0 37,089 5,421 0
Page 110

Page 111

outturn position at June, the Council is forecast to have a £4.323m surplus over
contingency. 
Heading Detail £000
Unallocated General Fund
as at 31 March 2022
This is the balance that is
unallocated over and above the 2%
contingency, which amounts to
£5.256m
1,841
Budgeted allocation to
General Fund for 2022-23
Budget
Per the Budget Motion at Council on
24 February 2022
2,482
Current Forecast Outturn
for 2022-23 as at 30 June
2022 
0
Estimated Unallocated
balance as at 31 March
2023 
4,323 
3.5 Loans Fund Review 
3.5.1 At the Council meeting on 27 February 2020, it was agreed that the one-off re-
profiling gain of £20.561m generated by the loans fund review should be used
partly to create a provision for the increasing principal repayments over the next
10 years (£7.649m) with the remainder of the gain (£12.912m) used to fund the
known liabilities/cost pressures. The table below shows what has been drawn
down against the one-off gain and the remaining balance. 
Agreed
Allocation
Transferred
to
Earmarked
Reserves / 
20-21 / 21-22
Budget
Transferred
to
Earmarked
Reserves /
22-23
Budget
Balance
Remaining 
£000 £000 £000 £000
Provision for the increasing
principal repayments 7,649   7,649
Provision to Support
Organisational Change 500 (500)  0
Estimated Cost of 2020-21
redundancies that are part of
budget savings proposals
600 (600)  0
Future Redundancies
Provision 1,500 (1,500)  0
Spend to Save Route
Optimisation 100 (100)  0
Funding Gap in Capital
Programme 2,619   2,619
Capital Programme
Intolerable Red Risks 574 (574)  0
Campbeltown Flood
Prevention Scheme 1,406   1,406
Significant Strategic Change
Projects  5,013 (2,856)  2,157
2020-21 Revenue Budget
Contribution  600 (600)  0 
20,561 (6,730)  13,831 
Page 111

Page 112

4. CONCLUSION 
4.1 The report outlines the overall reserves and balances for the Council covering
the purpose and level of each reserve.  It also provides detail as to expenditure
against earmarked balances held within the General Fund.   
4.2 As at 30 June 2022 the estimated unallocated General Fund, after taking into
consideration the budget motion and forecast outturn for 2022-23 is £4.323m.     
5. IMPLICATIONS 
5.1 Policy - Earmarked funds and funds set aside for delivery of
Single Outcome Agreement are available to support
Council Policy.
5.2 Financial -  Outlines the balances held with the Council’s usable
and unusable reserves.     
5.3 Legal -  None.
5.4 HR -  None.
5.5 Fairer Scotland Duty- None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty -  None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  A contingency of £5.256m (equivalent to 2% of net
expenditure) has been set aside as part of the
general fund.  This has been subject to a risk
assessment. 
5.8 Customer Service -  None. 
Kirsty Flanagan
Section 95 Officer 
8 July 2022 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
APPENDICES
Appendix 1 – Earmarked Reserves breakdown of unspent budget
Appendix 2 – Earmarked Reserves breakdown of COVID earmarkings 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk 
Page 112

Page 113

APPENDIX 1
Earmarked Reserves - Unspent Budget
As at 30 June 2022
Ref Department Service Description Opening Balance Budget
Drawdown
New earmarking
during 22-23
Remaining
Balance
Still to be drawn
down in 22-23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
001 Chief Executive's Unit Community Planning Communities and Partnership Team 8,855 8,855 8,855 0 The funds have originated from externally sourced income due to an employee being seconded to the
Scottish Community Development Centre (SCDC).  The funds will be used to support the team in
relation to meeting its priorities of Building Back Better (Communities), Climate Change and the review
of the Argyll and Bute Outcome Improvement Plan.
8,855 0 0
002 Chief Executive's Unit Community Planning Gaelic Development 8,235 8,235 8,235 0 To fund Gaelic specific work and project work of the Community Planning Partnership including the
development of the new 10 year Outcome Improvement Plan
8,235 0 0
003 Chief Executive's Unit Financial Services Financial Systems 114,000 114,000 114,000 0 To fund the completion of the implementation of the Oracle Fusion Financial Management System, a
software update for cash receipting to ensure card payments can still be taken and the procurement
and implementation of a new system to manage the requirements of the IFRS16 Leases accounting
standard.
114,000 0 0
004 Chief Executive's Unit Financial Services Accounting and Budgeting Team
Resilience
95,000 95,000 76,000 19,000 To fund the implementation of a new staffing structure in 2022/23 as agreed at ELT on 12 April 2022. 
This will provide funding to cover the additional staffing costs in 2022/23 and the training costs over
the period 2022/23 to 2026/27
76,000 5,000 14,000
005 Chief Executive's Unit Financial Services CIPFA 32,530 32,530 32,530 0 CIPFA Training - To fund the professional training costs for staff undertaking the CIPFA professional
accountancy qualification.
32,530 0 0
006 Chief Executive's Unit Financial Services Scottish Government Funding -
Welfare Reform/Discretionary
Housing Payments (agreed at
Council February 2014)
18,595 18,595 0 18,595 The Council was allocated additional funding of £550k from the Scottish Government late in 2013-14.
This money was allocated to support the Community Learning and Development Team to provide
courses to support Universal Credit claimants 2019/2020 to support the recruitment of casual tutors
and the purchase and upgrade of laptops. The monies were not utilised however it will now be
required to top up the Scottish Welfare Fund and DHP monies for 2022/23 as it is likely that given the
current cost of living crisis that more people will be in need of support through these funds
0 18,595 0
007 Executive Director (Douglas Hendry) Across Services / Education Digital Projects (Supply Staff
Booking System)
35,000 35,000 35,000 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063m and a general provision still to be allocated £0.189m
35,000 0 0
008 Executive Director (Douglas Hendry) Commercial Services Rothesay Pavilion Charity 750,000 750,000 375,000 375,000 Agreed at Council meeting February 2020, £750k additional revenue support subject to conditions
which seek to minimise the risk to the Council as far as is reasonably practicable including requirement
for adequate business and financial management and regular reporting by RPC.
375,000 375,000 0
009 Executive Director (Douglas Hendry) Commercial Services Demolition of former Lochgilphead
Primary and Rothesay Secondary
School
320,000 320,000 320,000 0 To fund the demolition of the former Lochgilphead Primary School and former Rothesay Academy
(subject to the removal of the listing).
320,000 0 0
010 Executive Director (Douglas Hendry) Commercial Services Rothesay Pavilion Essential repairs 306,400 306,400 306,400 0 Essential repairs to deal with potential health and safety risks and to avoid further deterioration. 
Budget provision was approved by the Policy and Resources Committee on 21 August 2014. 
306,400 0 0
011 Executive Director (Douglas Hendry) Commercial Services Estates - NDR Revaluation Appeals 84,688 84,688 84,688 0 The Council agreed to make provision to meet the cost of appealing Non Domestic Rates (NDR)
revaluations which will be imposed from 1st April 2017. It was agreed that £150,000 be earmarked
from the favourable 2016-17 outturn position to fund these appeals. The balance of £84,688  is still
required as NDR valuation appeals have been lodged but have not been heard yet. We will not know
the level of savings, and in turn the corresponding charge to us, until the appeals are concluded which
should be later on this year. Ryden are awaiting outcome of further citations which will incur fees.
84,688 0 0
012 Executive Director (Douglas Hendry) Commercial Services Site Investigation Works 21,013 21,013 21,013 0 For Site Investigation works in relation to Tweeddale Street Car Park, Oban and Oban Airport Business
Park to explore commercial opportunities to develop the sites and gain revenue income for Argyll and
Bute Council.  HUB North were instructed to procure contractors to undertake the site investigations
and work commenced in March 2020.   This is still ongoing.
21,013 0 0
013 Executive Director (Douglas Hendry) Commercial Services Catering and Cleaning Restructure
Costs
17,000 17,000 17,000 0 To support the catering and cleaning team restructure 17,000 0 0
014 Executive Director (Douglas Hendry) Education Education Transformation Fund 187,526 187,526 187,526 0 At the Council meeting on 27 February 2020, it was agreed to input £400k into Education Digital
Learning.  The additional funds have been spent in 20/21 and 21/22, as part of the ongoing
transformation work in the Education service, focussing on digital and virtual learning technology and
the development of learning clusters.  This will continue into 2022/23.
187,526 0
015 Executive Director (Douglas Hendry) Education Education Learning Estate Condition
Surveys
77,440 77,440 77,440 0 To fund the delivery of School Core Facts (SCF) compliant Condition Surveys for prioritised School
Buildings.
77,440 0 0
016 Executive Director (Douglas Hendry) Education Skype for Business for Education /
Digital Projects (Skype for Business)
10,000 10,000 10,000 0 To fund the initial capital costs for the implementation of Skype for Business for Education.  This will
bring the Education service in line with other council departments and will improve staff collaboration
and modernise school telephony to deliver the  service more efficiently and cost effectively.
A balance has been released back to the general fund because the rollout project is almost complete
with only £0.01m expected spend in 22/23.
10,000 0 0
017 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Education Purchasing Officers 210,000 210,000 90,000 120,000 The earmarked funds will be used to fund an education purchasing team within the Procurement
Service for two years.  The team will embed good procurement practice, train headteachers on current
procurement process requirements, develop spend plans that evidence best value.
90,000 120,000 0
018 Executive Director (Douglas Hendry) Legal and Regulatory
Services
NDR - One off contribution to 22/23
Budget
200,000 200,000 200,000 0 To fund one off operational saving CS04 agreed for the 2022/23 budget. 200,000 0 0
019 Executive Director (Douglas Hendry) Legal and Regulatory
Services
NPDO Schools Contract 166,000 166,000 166,000 0 To fund one off operational saving LRS01 agreed for the 2022/23 budget 166,000 0 0
Page 113

Page 114

Ref Department Service Description Opening Balance Budget
Drawdown
New earmarking
during 22-23
Remaining
Balance
Still to be drawn
down in 22-23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
020 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Transformation Agenda QIO 100,259 100,259 70,259 30,000 Ongoing funding for the QIO post to lead the implementation of the service transformation
programme. The QIO will assist the Executive Director to deliver the Council’s transformation agenda
by developing, analysing and monitoring initiatives and projects which deliver the vision, values and
strategic objectives of the Council.
70,259 30,000 0
021 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Digital Projects: Hybrid Council
meetings
55,000 55,000 30,000 25,000 Per paper agreed at SMT October 2021 - allocation from Digital Projects (General Provision to be
allocated).  To fund the costs of livestreaming of Council meetings. 
30,000 25,000 0
022 Executive Director (Douglas Hendry) Legal and Regulatory
Support
Councillor IT Equipment 65,000 65,000 65,000 0 To meet the cost of provision of IT equipment for all new Elected Members as a result of the Local
Government Election in May 2022.
65,000 0 0
023 Executive Director (Douglas Hendry) Legal and Regulatory
Support
Debt Counselling & Welfare Rights 27,025 27,025 27,025 0 To meet the cost of a Debt Counselling and Welfare Rights Management System. 27,025 0 0
024 Executive Director (Douglas Hendry) Legal and Regulatory
Support
Community Safety Partnership 16,000 16,000 16,000 0 To earmark the Community Safety Partnership funding received for 2021/22 to be used for Community
Safety Partnership purposes.
16,000 0 0
025 Executive Director (Kirsty Flanagan) Customer Support Services Microsoft 365 300,000 300,000 166,930 133,070 To be added to existing earmarked reserves to meet increasing MS365 licensing costs from 2022/23
onwards
166,930 133,070 0
026 Executive Director (Kirsty Flanagan) Customer Support Services Growing our Own and Modern
Apprentices
109,150 109,150 109,150 0 Funding earmarked to support trainee development and modern apprenticeship opportunities based
on priority workforce risk areas. These areas have been identified and proposals developed. £95,790 to
be spent in 22/23 and £13,360 to be spent in 23/24 to fund a graduate trainee and 3 apprentices to
deliver trainee development and modern apprenticeship opportunities
109,150 0 0
027 Executive Director (Kirsty Flanagan) Customer Support Services Security Operations Centre
Subscription
76,455 76,455 0 76,455 There is a requirement to pay for a 3-year subscription at £60,000 per annum with a cost pressure
being added to the ICT revenue budget to cover the costs from year 4 onwards.  There is unallocated
funding of £103,545 from the earmarking created at 2020/21 year end for 'Digital Projects', so the
earmarking request for 2021/22 year end is the balance of £76,455
16,455 60,000
028 Executive Director (Kirsty Flanagan) Customer Support Services Learning and Development 36,508 36,508 36,508 0 In order to maximise the opportunities and efficiencies of digital learning, this funding will be used to
support the extension of digital learning in order to deliver the Digital Learning Strategy, which was
approved in FQ4 20/21.
36,508 0 0
029 Executive Director (Kirsty Flanagan) Customer Support Services Implementation of Gaelic Language
Plan
30,000 30,000 30,000 0 Agreed at Council Meeting February 2021.  Provision of funding for delivery and implementation of the
council’s Gaelic Language Plan in recognition of the contribution that Gaelic makes to economic growth
and to the tourism sector, and to enable delivery of key activities within the plan which currently
receive no revenue funding.
30,000 0 0
030 Executive Director (Kirsty Flanagan) Customer Support Services Establishing HR Service Centre 30,000 30,000 18,000 12,000 To facilitate the implementation of technical efficiency improvements and new processes 18,000 12,000 0
031 Executive Director (Kirsty Flanagan) Customer Support Services Business Development Training 27,601 27,601 27,601 0 This budget is funding ongoing leadership development, coaching, action learning sets and
commissioned training including Priority Management.
27,601 0 0
032 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Oban TIF (Tax Incremental
Financing)
709,700 709,700 709,700 0 Will be used to fund the TIF Programme office for a further 3 years as well as the programme office for
Rural Growth Deal beyond the funding that was agreed at Council for this in February 2021.
709,700 0 0
033 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Strategic Events & Festivals 115,764 115,764 115,764 0 At the Council meeting on 25 February 21, a decision was taken to agree £90k funding for Events and
Festivals for 22-23, in order that the application process can commence during 21-22 and that this
agreed figure be augmented by any underspend remaining from the 20-21 financial year.  At 24
February 22, decision made to agree £90k for 23-24, in order that the application process can
commence during 22-23 and that this agreed figure be augmented by any underspend remaining from
the 21-22 financial year
115,764 0
034 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Island Post 50,461 50,461 50,461 0 To fund a temporary post at LGE11 to assist with the National Islands Plan Implementation Route Map
2020-2025
50,461 0 0
035 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Royal National Mod 40,000 40,000 20,000 20,000 One off funding allocation for the Royal National Mod agreed as part of the budget setting process for
2019-20. Grant contract issued. Proposed payment of £20k per annum starting 2020/21  (2023/24 final
payment of £20k)
20,000 20,000 0
036 Executive Director (Kirsty Flanagan) Roads & Infrastructure Waste Variation Monies 1,492,997 1,492,997 746,499 746,498 This would be used to fund/part-fund various waste infrastructure projects that will support the
council’s compliance with the 2025 ban on the Landfill of Biodegradable Municipal Waste, including
the development of landfill cell construction works at Gartbreck.
746,499 746,498 0
037 Executive Director (Kirsty Flanagan) Roads & Infrastructure Climate Change 500,000 500,000 500,000 0 At the Council meeting on 27 February 20, it was agreed to input £500k budget to mitigate the impacts
of weather related damage and climate change with specific emphasis on gully cleaning and drainage
improvements  Spend has been delayed due to COVID and the intention is to spend the funds on 2
500,000 0
038 Executive Director (Kirsty Flanagan) Roads & Infrastructure 3G pitches / Tarbert Sports Pitches 427,286 427,286 89,373 337,913 In November 2018, the Council agreed to a maintenance funding package to be progressed for a
number of 3G pitches including Tarbert. This funding will provide an estimated 6.5 years’ worth of
ongoing maintenance up to 2025-26.
89,373 337,913 0
039 Executive Director (Kirsty Flanagan) Roads & Infrastructure Green Transport Initiatives 400,000 400,000 400,000 0 At the Council meeting on 27 February 20, it was agreed to input £400k in Green transport, investment
in footway and cycle path maintenance supporting the healthy wellbeing and green agenda.  Spend
has been delayed due to COVID and this will be taken forward in 21-22. £260k Footways
Reconstruction programme now agreed across the four areas, £140k Ardrishaig North Project.
400,000 0
040 Executive Director (Kirsty Flanagan) Roads & Infrastructure Waste Strategy 363,000 363,000 225,000 138,000 To fund/part-fund various waste infrastructure projects that will support the council's compliance with
the 2025 ban on the Landfill of Biodegradable Municipal Waste.
225,000 138,000 0
041 Executive Director (Kirsty Flanagan) Roads & Infrastructure Waste Management 256,753 256,753 256,753 0 Will be used towards long term waste management strategy/model, including but not limited to
scoping work for the creating of a waste transfer station .
256,753 0 0
042 Executive Director (Kirsty Flanagan) Roads & Infrastructure Replacement Signage and Bins 135,366 135,366 135,366 0 To replace street litter bins and key road signage.  This would help to reduce future budget pressures
for replacements of bins and signs and would also help to enhance the streetscape and general
appearance of the area by refreshing the street furniture
135,366 0 0
043 Executive Director (Kirsty Flanagan) Roads & Infrastructure Kintyre Recycling Redundancy Costs 36,000 36,000 36,000 0 To fund redundancy costs associated with Kintyre Recycling 36,000 0 0
044 Executive Director (Kirsty Flanagan) Roads & Infrastructure Amenity Services introduction of
management information system
28,099 28,099 28,099 0 Delay with introduction of amenity time recording system, spend unlikely to be incurred until 2022-23
for handheld devices and software.
28,099 0 0
045 Non Departmental Non Departmental Underwriting development of
Rothesay Pavilion
1,000,000 1,000,000 1,000,000 0 Funding to meet additional costs identified as necessary for the refurbishment of Rothesay Pavilion. 1,000,000 0 0
046 Non Departmental Non Departmental Loans Fund 385,279 385,279 385,279 0 At the Council Budget meeting on 24 February 2022, Saving FS01, a Loans Fund
Management/Operational saving for 22/23 budget of £0.500m was agreed with at least £0.200m to
come from underspends in 21/22.  The underspend position for 21/22 is £0.385m and this has to be
earmarked to help offset the saving. 
385,279 0 0
047 Non Departmental Non Departmental Utilities 283,000 283,000 283,000 0 To contribute towards the expected adverse impact on the 2022/23 budget of utility costs inflation as
per Budget Pack
283,000 0 0
Page 114

Page 115

Ref Department Service Description Opening Balance Budget
Drawdown
New earmarking
during 22-23
Remaining
Balance
Still to be drawn
down in 22-23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
048 Non Departmental Non Departmental Digital Projects (General Provision to
be allocated)
103,545 103,545 103,545 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063mand a general provision still to be allocated £0.189m. 
Further allocation to Hybrid Council Meetings agreed October 2021 (£0.085m).
There is a proposal for 2021-22 year end to use the balance of this earmarking towards the Security
Operations Centre Subscription unspent budget request - per Appendix 2.1l
103,545 0 0
049 Non Departmental Non Departmental Community Resilience Fund 76,447 76,447 76,447 0 Fund established in 2012/13 to be spent over more than one year. Fund reduced at the Council
meeting on 11 February 2016
76,447 0 0
050 Non Departmental / Chief
Executive's Unit
Across Services / Chief
Executive's Unit
Information Management (Balance
of Funding)
209,844 209,844 209,844 0 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV Review. 
The planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k,
document management and workflow system for Planning, Building Standards and Environmental
Health £77k and a balance of funding to explore information management solutions in a strategic and
coherent way £209k
209,844 0 0
051 Non Departmental / Executive
Director (Douglas Hendry)
Across Services /
Commercial Services
Information Management (Estates
Survey Work)
12,697 12,697 12,697 0 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV Review. 
The planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k,
document management and workflow system for Planning, Building Standards and Environmental
Health £77k and a balance of funding to explore information management solutions in a strategic and
coherent way £209k
12,697 0 0
052 Non Departmental / Executive
Director (Douglas Hendry)
Across Services / Legal and
Regulatory Services
Information Management
(Digitalisation of Title Deeds)
92,000 92,000 61,000 31,000 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV Review. 
The planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k (delay on
spending due to COVID-19), document management and workflow system for Planning, Building
Standards and Environmental Health £77k and a balance of funding to explore information
management solutions in a strategic and coherent way £209k
61,000 31,000 0
053 Non Departmental / Executive
Director (Kirsty Flanagan)
Across Services / Customer
Support Services
Digital Projects (Digital Customer
Engagement Projects)
73,000 73,000 73,000 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063m and a general provision still to be allocated £0.189m
73,000 0 0
054 Non Departmental / Executive
Director (Kirsty Flanagan)
Across Services / Customer
Support Services
Digital Projects (Increase in Schools
Bandwidth)
63,455 63,455 63,455 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063m and a general provision still to be allocated £0.189m
63,455 0 0
055 Non Departmental / Executive
Director (Kirsty Flanagan)
Across Services / Customer
Support Services
Digital Projects (Replacement
Learning Management System)
11,470 11,470 11,470 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063m and a general provision still to be allocated £0.189m
11,470 0 0
056 Non Departmental / Executive
Director (Kirsty Flanagan)
Across Services /
Development and
Economic Growth
Information Management
(Document Management and
Workflow for Planning, Building
Standards and Environmental
Health)
57,491 57,491 57,491 0 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV Review. 
The planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k,
document management and workflow system for Planning, Building Standards and Environmental
Health £77k and a balance of funding to explore information management solutions in a strategic and
coherent way £209k
57,491 0 0
10,458,934 0 0 10,458,934 8,376,403 2,082,531 8,376,403 2,008,531 74,000
Page 115

Page 116

APPENDIX 2
COVID Earmarkings
As at 30 June 2022
Ref Department Service Description Opening Balance Budget
Drawdown
Released back to
General Fund
New earmarking
during 22-23
Remaining
Balance
Still to be
drawndown in 22-
23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
001 Chief Executive's Unit Community Planning Community Planning - temp post to
support communities
55,000 55,000 55,000 0 As agreed at Policy & Resources committee on 9 December 2021, allocation of £0.055m to a post to
support the economic and social recovery together with the building back stronger themes.
55,000 0 0
002 Chief Executive's Unit Community Planning COVID-19 - Test and Protect Support 44,047 44,047 44,047 0 Funding provided in relation to the Local Self-Isolation Assistance Service.  The Community Planning
and Development Team will work with community groups to support their community response and
resiliency to Test and Protect and COVID-19 impacts
44,047 0 0
003 Chief Executive's Unit Financial Services LACER Fund 797,720 797,720 797,720 0 The Council meeting on 28 April 2022, it was agreed that Local Authority Covid Economic Recovery
(LACER) Funding is to be used to distribute Scotland Loves Local cards to CTR recipients. This will take
place in June 2022 giving Economic Development time to encourage the Co-op to sign up to accept the
cards.
797,720 0 0
004 Chief Executive's Unit Financial Services Housing Benefits Private 673,867 673,867 673,867 0 Specific funding allocation for DHP to support tenants financially affected by the COVID-19 outbreak to
sustain their tenancies.  It is expected there will continue to be pressure on this budget going into 22-
23
673,867 0 0
005 Chief Executive's Unit Financial Services Flexible Food Fund 510,573 510,573 510,573 0 Financial Insecurity funding from Scottish Government routed into the Argyll and Bute Flexible Food
Fund (ABFFF) is aimed at tackling financial insecurity for adults and families across Argyll and Bute. 
ABFFF offers financial support and wider confidential professional help to anyone suffering hardship.
Working in partnership with the Community Food Forum, Bute Advice Centre and ALIenergy,
households with low incomes and no access to cash savings can apply for immediate financial support. 
The Fund will help support daily living expenses.  If the claimant engages with these services, a second
payment will be made to contribute to a further months daily living expenses.  In the period from 10
January 2021 to 30 April 2022 client gain in extra benefits income for families was £1.45 million with
1,090 families had been supported. The project has been extended to 31 March 2023 and this money
will be used to support it.
510,573 0 0
006 Chief Executive's Unit Financial Services Flexible Funding for Supporting
People while at Tier 4 COVID
167,983 167,983 167,983 0 Funding to strengthen local authority responses to meet emerging needs and support people in their
communities struggling with the restrictions and guidance at all protection levels, particularly those at
risk through health and social inequalities; this support could cover the same types of support
currently delivered including information and advice, access to food and medicines, and practical and
emotional support; and, administration costs to support delivery (e.g. strengthening the National
Assistance Helpline) and liaison and co-ordination with 3rd sector. It will be for Local Government to
use this funding flexibly for this purpose. 
167,983 0 0
007 Chief Executive's Unit Financial Services Self Isolated Support Grant 16,000 16,000 16,000 0 Unspent admin funding for processing Self isolation Support Grants. Monies will be fully utilised in
2022/2023 to support the further administration of the grant until 31 March 2023.
16,000 0 0
008 Chief Executive's Unit Financial Services Test and Protect Extension 9,929 9,929 9,929 0 Funding provided in relation to the Local Self-Isolation Assistance Service.  This will be used to support
the recruitment of 0.5FTE LGE6 temp post to assist with call volumes in the Scottish Welfare Fund
team in 2022/23
9,929 0 0
009 Executive Director (Douglas Hendry) Education Logistics Funding - Safe Opening of
Schools
940,605 940,605 940,605 0 SG Funding to ensure the safe opening and operation of schools.  Includes transport, PPE, Cleaning and
expansion of estate.
940,605 0 0
010 Executive Director (Douglas Hendry) Education Additional Teaching/Support in
Schools/Digital Devices/Family
Home Learning Support Fund -
£45m Grant - £45m
488,310 488,310 488,310 0 Continuation of funding for additional staffing, teachers, support staff, additional devices for pupils
and additional family /home learning programmes.
488,310 0 0
011 Executive Director (Douglas Hendry) Education COVID 19 - Education Recovery -
Additional Staff in School and ELC
settings
373,346 373,346 373,346 0 To employ a variety of school staff to meet the needs of children and young people in their local areas
and ensure that levels of teaching and support staff in schools can be maintained in the 2021-22
academic year.  Funding will also be used to support the transition from ELC to primary school.
373,346 0 0
012 Executive Director (Douglas Hendry) Education Education to Support Young People 321,816 321,816 321,816 0 As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.600m.  Agrees
to fund a package of measures to boost the wellbeing and build back the resilience of young people, in
particular those most vulnerable, following the Covid-19 pandemic, including counselling and increased
provision of childcare for children under three. Notes that the Scottish Government is yet to confirm
details of funding for similar initiatives and, should our investment in children’s wellbeing qualify for
this funding, the balance will be re-allocated to the Recovery and Renewal Fund. 
321,816 0 0
013 Executive Director (Douglas Hendry) Education Recruitment of Additional Teachers
and Support Staff in Schools
136,715 136,715 136,715 0 Fund additional teachers and support staff. 136,715 0 0
014 Executive Director (Douglas Hendry) Education EDU - Community Mental Health
and Wellbeing Support to Children
and Young People - Pandemic
Funding
49,756 49,756 49,756 0 Scottish Government/COSLA Initiative to support the work under the Children and Young People's
Mental Health and Wellbeing Programme grant split in 2020-21 with £183,750 of the fund utilised by
local collaborative partnerships for supporting children, families and carers through the pandemic.  The
Scottish Government has agreed for the balance to be spent in 2022/23.
49,756 0 0
015 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Welfare Rights Support 172,000 172,000 172,000 0 As agreed at the Council Meeting on 25 February 2021 - an allocation of £0.172m.  As part of our focus
on Improving Opportunities for People and Communities, agrees to provide additional resources to
proactively support people experiencing poverty and hardship, by investing in two additional Welfare
Rights support staff for two years.
172,000 0 0
016 Executive Director (Douglas Hendry) Legal and Regulatory
Services
LACER Funding - Advice Services 130,000 130,000 130,000 0 Local Authority COVID Economic Recovery (LACER) Funding for Welfare Rights - ALI Energy, Bute
Advice, Citizens Advice
130,000 0 0
017 Executive Director (Kirsty Flanagan) Customer Support Services Self Isolated Support / Self Isolated
Support Grant (HR)
115,000 115,000 115,000 0 These were monies that were provided by Scotgov to fund additional overtime and resources for
Shielding/Caring for People and Test and Protect activities, however low infection rates and therefore
demand in A&B meant that this was not required in 2020/21 or 2021-22.
The 2021-22  funding of £43,000 will be be used for Recovery related activities including the
recruitment of a Temporary Additional Web Developer to implement the improvements identified by
customers in the Customer Engagement Consultation and to mainstream the Coronavirus page
content back in to Business as usual. Another portion will be used to fund the Digital Receptionist
solution as part of safe re-opening of offices. 
The 2021-22 funding of £72,000 will be used to fund consultancy and development of RPA (robotic
process automation) software which will build automation within HR workflows and processes. This
will improve efficiency and accuracy.
115,000 0 0
018 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Staycation and Marketing Argyll and
Bute
592,013 592,013 592,013 0 As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.800m.   This will
include provision of additional waste disposal facilities and other facilities that will be informed by the
Motorhome and Informal Camping Survey.
592,013 0 0
Page 116

Page 117

Ref Department Service Description Opening Balance Budget
Drawdown
Released back to
General Fund
New earmarking
during 22-23
Remaining
Balance
Still to be
drawndown in 22-
23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
019 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Tackling Digital Exclusion Top-Up
Fund
250,000 250,000 250,000 0 As agreed at the Council Meeting on 25 February 2021.  Establishes the Tackling Digital Exclusion Top
Up Fund to support communities and in some cases individuals that are missing out on national
programmes due to logistics and economies of scale.  While vouchers are available from the UK and
Scottish Governments in some cases these do not cover the full cost of infrastructure builds.
250,000 0 0
020 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (Small Business
Development Grant)
200,000 200,000 200,000 0 Local Authority COVID Economic Recovery Fund grant.  This funding will provide funding of between
£500 and £5,000 to help existing micro and small businesses to improve their resilience or growth via
projects to implement green initiatives, implement digital development, implement marketing
improvements and improve efficiency/innovation.
200,000 0 0
021 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (Sector Support
Grant)
150,000 150,000 150,000 0 Local Authority COVID Economic Recovery Fund grant.  This will provide funding, either part of the
small  business development grant or standalone, to help micros and small business to implement
projects that contribute to the sector as well as benefitting the business, for example: Tourism and
hospitality, food and drink or retail.  With option to provide additional business support to hard hit
areas including Bute and Kintyre where unemployment remains higher than average - support via
specialist advice, locally tailored grants to meet local priorities and targeted marketing activity.
150,000 0 0
022 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (New Enterprise
Support Grant)
120,000 120,000 120,000 0 Local Authority COVID Economic Recovery Fund grant.  This funding would provide £3,000 grants to
help new businesses start up and establish.
120,000 0 0
023 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Staycation Investment per budget
pack February 22
100,000 100,000 100,000 0 As agreed at Council on 24 February 2022, Staycation investment £0.100m.  Augments the 2021/22
£0.5m staycation initiative with an additional investment of £100k, including support for community
groups and partners in the provision of facilities which can support increasing staycation visitor
numbers during the 2022/23 season.
100,000 0 0
024 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Economic Development - temp post
to support economic recovery
55,000 55,000 55,000 0 As agreed at Policy & Resources committee on 9 December 2021, allocation of £0.055m to a post to
support the economic and social recovery together with the building back stronger themes.
55,000 0 0
025 Executive Director (Kirsty Flanagan) Development and
Economic Growth
EH Covid Posts 41,145 41,145 41,145 0 Funding for 2 posts for 2 years and not recruited until late 20-21 41,145 0 0
026 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (Shop Local) 40,000 40,000 40,000 0 Local Authority COVID Economic Recovery Fund grant.  This funding would provide funding to continue
the Shop Local scheme into 2022-23 and 2023-14, buying additional cards and allow the cards to gather
momentum and support local businesses.
40,000 0 0
027 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Tenant Hardship Fund 30,000 30,000 30,000 0 Grant received from Scottish Government to support tenants suffering hardship due to COVID-19. 
Claims have been made and Housing are in the process of paying these out and all claims will be
settled during 2022-23.
30,000 0 0
028 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (Gypsy Travellers) 10,000 10,000 10,000 0 Local Authority COVID Economic Recovery Fund grant.  This funding would pay for MECOPP (Minority
Ethnic Carers of People Project) to engage with the Gypsy Travellers community on the important
subject of the cost of living increases, fuel poverty and the impact of factors such as their remote rural
locations and the facilities available to them for everyday living  have on their livelihoods
10,000 0 0
029 Non Departmental Across Departments COVID Cost Pressures Beyond
2021/22
370,000 370,000 370,000 0 As agreed at the Council Meeting on 25 February 2021 (£2.5m)  with the value reduced to £0.370m
based on more up to date projections at year end 2021-22.  Allocation of COVID funding to projected
22/23 Revenue Cost Pressures
370,000 0 0
030 Non Departmental Non Departmental Recovery and Renewal Fund 1,547,000 1,547,000 1,547,000 0 As agreed at Council on 24 February 2022, Recovery and Renewal Fund £1.547m.  This is provision for
future recovery, regeneration and renewal, as well as any future pressures which may arise following
the Covid-19 pandemic through a dedicated Recovery and Renewal Fund.  Proposals for use of this
fund to be brought forward by officers to the Policy and Resources Committee. To include in the first
instance options for maximising Argyll and Bute’s potential as a green, connected staycation
destination of choice, requesting that officers bring to the Environment, Development and
Infrastructure Committee a report on use of external funding sources and other opportunities for
improving the electric vehicle charging network.
1,547,000 0 0
031 Non Departmental Non Departmental Unallocated Admin Support Grant 411,285 411,285 411,285 0 Funding to support the delivery of the Business Grants to local businesses, partially used during 20/21
and 21/22 but a balance remains to be carried forward and used in future years
411,285 0 0
032 Non Departmental Non Departmental Capital pressure 257,000 257,000 257,000 0 Pressure identified on the 20-21 COSLA COVID costs spreadsheets - requires to be earmarked to be
drawn down when required against the Capital Plan
257,000 0 0
033 Non Departmental Non Departmental Levelling up Fund bids per P&R
February 22
150,000 150,000 150,000 0 As agreed at Policy & Resources committee on 17 February 2022, an allocation of  up to £0.150m to
support Levelling Up Fund bids
150,000 0 0
034 Non Departmental Non Departmental CHARTS per budget pack February
22
75,000 75,000 75,000 0 As agreed at Council on 24 February 2022, investment in CHARTS £0.075m.  To support the
organisation in delivering targeted support, in communities, to the culture, arts and heritage sector as
part of its plans to contribute to overall economic recovery.
75,000 0 0
035 Non Departmental Non Departmental CHARTS 7,000 7,000 7,000 0 As agreed at the Council Meeting on 25 February 2021.  Allocation of COVID funding to CHARTS
£0.067m, with the balance of £0.007m being carried to 2022/23.  The allocation is to ensure that Argyll
and Bute’s culture, heritage and arts sector can make a contribution to our overall recovery and
renewal.
7,000 0 0
9,408,110 0 0 0 9,408,110 9,408,110 0 9,408,110 0 0
Page 117

Page 118

This page is intentionally left blank

Page 119

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 11 AUGUST 2022
BUDGET OUTLOOK 2023-24 TO 2027-28  
1. EXECUTIVE SUMMARY 
1.1 This report provides an update to the budget outlook 2023-24 to 2027-28,
reported to the Policy and Resources Committee on 16 June 2022. 
1.2 The estimates within the report are based on the mid-range scenario with best
and worst case scenarios noted in Appendix 1. 
1.3  The assumptions in respect of future years Scottish Government funding
remain unchanged from those reported on 16 June 2022 and ranges between
0.5% reduction (best case) and 1.5% reduction (worst case) with a mid-range
reduction of 1.0%.  
1.4 There are no changes to my previous assumptions around the growth in
Council Tax. For 2023-24 the Council tax base has been assumed to grow by
1% in the worst case scenario, 1.5% in the mid-range scenario and 2% in the
best case. In future years this then drops down to 0.25% in the worst case
scenario, 0.5% in the mid-range scenario and 0.75% in the best case. 
1.5 There are no changes to the base budget since the report on 16 June 2022. 
1.6 Similarly there are no changes to the assumptions in respect of employee costs
for Council services which were previously noted as follows:
 Pay award for 2023-24 to 2027-28 of between 2% in the best and mid-
range scenarios and 5% within the worst case scenario. It is acknowledged
that as the pay award has not yet been agreed it could differ from this
estimate and at this stage we are recognising that possibility as a financial
risk.
 Increments between £0.345m and £0.690m with mid-range £0.690m. 
1.7 For non-pay inflation, only unavoidable/inescapable inflation has been built in
for the best case and mid-range scenarios with a contingency of £0.250m built
into the mid-range. A further general inflationary increase has been built into
the worst case scenario. The estimates for non-pay inflation have increased by
£0.434m with the main increases being insurance and bitumen prices. 
1.8 There are a number of cost and demand pressures for Council services built
into each scenario. Changes to these pressures since the report on 16 June
2022 are:
 New - Increased cost of salt for Winter Maintenance
 New - Cease use of red diesel
 New - Insurance payments
Page 119 Agenda Item 5

Page 120

1.9 In addition to the identified cost and demand pressures an allowance for
unidentified cost and demand pressures has been included in mid-range and
worst case scenarios of between £0.250m and £0.500m per year. 
1.10 There will be a political decision to be made as to the future allocation to the
Health and Social Care Partnership.  As part of the budget agreed in February
2022, indicative allocations for 2023-24 to 2024-25 were agreed on the basis of
a flat cash allocation. In the budget outlook I have assumed flat cash
allocations across all three scenarios. 
1.11 At this stage a 3% reduction to the Live Argyll Management fee has been
included within the estimates.  At the 2022-23 budget setting meeting in
February 2022 it was agreed to defer the proposed 3% reduction to the Live
Argyll management fee until 2023-24 subject to any future budget decisions. It
was agreed that management would engage in early discussions with Live
Argyll in relation to future approach to support effective longer term financial
planning. 
1.12 The budget gap in the mid-range scenario after allowing for the current base
commitments, employee adjustments, non-pay inflation and cost and demand
pressures and not factoring in any previous savings decisions or future
potential options is an estimated gap over the five year period of £47.784m with
a gap of £10.292m in 2023-24. 
1.13 The measures to balance the budget over the next five years are as follows:
 Proposed increase to fees and charges of between 2% and 4% (3% mid-
range).
 3% reduction to the Live Argyll Management Fee.
 Management/operational savings agreed by Council in February 2022. 
 Policy savings already agreed by Council in February 2022.
 Proposed increase to Council Tax (3% in all scenarios). 
1.14 In the mid-range scenario, the revised budget gap estimated over the five year
period 2023-24 to 2027-28 is £36.493m with a gap of £7.980m in 2023-24.   
1.15 The budget gap in the best case scenario over the five years is £25.060m with
a gap of £5.367m in 2023-24 and in the worst case scenario, the budget gap
over the five years is £79.798m with a gap of £16.231m in 2023-24.  A
summary of all three scenarios is included within Appendix 1. 
1.16 It is recommended that the Policy and Resources Committee consider the
current estimated budget outlook position for the period 2023-24 to 2027-28. 
Page 120

Page 121

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 11 AUGUST 2022
BUDGET OUTLOOK 2023-24 TO 2027-28  
2. INTRODUCTION 
2.1 This report provides an update to the budget outlook 2023-24 to 2027-28,
reported to the Policy and Resources Committee on 16 June 2022. 
2.2 The budget outlook has been prepared using three different scenarios, best case,
worst case and mid-range.  Relatively small variations in assumptions can lead to
fairly significant changes in the outcome.  In the paragraphs that follow, the mid-
range outlook is shown, however, all three scenarios are detailed within Appendix
1. 
3.  RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee consider the current
estimated budget outlook position for the period 2023-24 to 2027-28. 
4. DETAIL 
4.1 Funding 
Scottish Government Finance Settlement 
4.1.1 There are no changes to my previous assumptions around the level of future
Scottish Government funding.  In my report in June, I advised that the Resource
Spending review indicated that Local Government is expected to receive a flat
cash settlement up to 2026-27.  The flat cash position is at portfolio level and
does not include any transfers to Local Government from other portfolios in-year.  
These transfers are likely not be confirmed until December 2022 and that, along
with the fact that due to our declining population our settlement is usually worse
that the average, lead me to the funding assumptions built into the outlook.  The
funding assumptions range between a 0.5% reduction (best case) and 1.5%
(worst case) with a mid-range reduction of 1.0%.   
4.1.2 The table below summarises the mid-range scenario estimates expressed in
percentage terms and monetary value. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
% Change to Funding -1.0% -1.0% -1.0% -1.0% -1.0%
Estimated SG Funding
Reduction
(2,016) (2,143) (2,122) (2,101) (2,080)
Estimated SG Funding 214,330 212,187 210,065 207,964 205,884 
Page 121

Page 122

Council Tax 
4.1.3 The Council Tax budget for 2022-23 was set at £55.262m which reflected a 3%
inflation increase and 1.5% growth in the Council Tax base as agreed by the
Council on 24 February 2022. 
4.1.4 There are no changes to my previous assumptions around the growth in Council
Tax. It has been assumed that a 1.5% growth in the mid-range (1% in worst case
and 2% in best case) should be maintained for 2023-24 with the drop down to
0.5% in the mid-range in 2024-25. 
4.1.5 Within this report, I will present the budget gap, prior to any Member based
decisions and therefore at this stage in the report, the Council tax base is
assumed to remain at the same level as 2022-23.   
4.1.6 The table below summarises the estimated total funding in the mid-range
scenario. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Estimated SG Funding 214,330 212,187 210,065 207,964 205,884
Council Tax Base 55,262 55,262 55,262 55,262 55,262
Council Tax Growth 829 1,109 1,391 1,674 1,959
Total Estimated
Funding
270,421 268,558 266,718 264,900 263,105 
4.2 Base Budget 
4.2.1 The 2022-23 budget approved by Council on 24 February 2022 was £262.812m.   
4.2.2 For future years, there are adjustments required to the base budget from
decisions by Council on 24 February 2022 and other adjustments as noted in the
table below: 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Base Budget 2022-23 262,812 262,812 262,812 262,812 262,812
Additional Funding in
Finance Order (see
paragraph 4.1.4)
6,315 6,315 6,315 6,315 6,315
Additional budget required
in relation to the Teachers
Pay Settlement 2021-22
(see paragraph 4.1.5)
121 121 121 121 121
Adjust for repayment of
Loans Fund Principal
Repayment Holiday
162 170 179 188 197
Remove one off 2022-23
Election costs
(350) (350) (350) (350) (350)
Remove one off 2022-23
Management/Operational
savings
2,174 2,182 2,182 2,182 2,182
Revised Base Budget 271,234 271,250 271,259 271,268 271,277 
Page 122

Page 123

4.3 Employee Cost Changes 
Pay Award 
4.3.1  The pay award for 2022-23 has still to be agreed and this may have an impact on
the base budget if the pay award is greater than the estimate built into the current
year’s budget, which was 2%.   
4.3.2 In March 2022, COSLA Leaders agreed to make an undifferentiated offer of a 2%
uplift to all bargaining groups on the basis of parity for all which has been both a
key concern and agreed position for the past number of years.  All Unions
rejected this initial offer.  On 17 June 2022, COSLA Leaders agreed to “mandate
the Resources spokesperson to make a revised pay offer of 5% contingent on
additional funding being provided by the Scottish Government, matching that
offered to Agenda for Change staff, and, recognising the significant affordability
impact this will have for Councils, to continue discussions to make clear to
Scottish Ministers that they must urgently identify and provide additional financial
resource for Local Government to protect local services and current staffing
levels.”  Negotiations are ongoing.   
4.3.3 The COSLA remuneration advisory group, made up of advisors from the Society
of Local Authority Chief Executives (SOLACE), The Directors of Finance and the
Society of Personnel and Development Scotland (SPDS) has noted the
constraints on Local Government funding, with two thirds of Councils having
budgeted for a pay increase of 2% or less.  The 2% increase is deemed to be
affordable, hence why that is the assumption that has been built into the mid-
range scenario.  On speaking with Director of Finance colleagues in early July,
there is still a shared view that no more than 2% is affordable for Local
Government.     
4.3.4 For future years, the pay assumption remains at 2% in both the mid-range and
the best case, reflecting that 2% is deemed to be affordable but it is not likely that
the pay award will be less than this.  For scenario purposes, 5% has been built
into the worst case.  There remains a significant risk that the pay award agreed
for 2022-23 and beyond could be higher.  Every 1% over and above what is
budgeted would add an additional pressure of circa £1.5m.   
Increments 
4.3.5 There are no changes to my previous assumption around the cost of employee
increments. It has been assumed that for future years, the best case is half of the
previous year cost, for mid-range and worst case, it will be equal to the cost in
2022-23 (£0.690m).   
4.3.6 The table below summarises the employee cost increases in the mid-range
scenario for Council services.  The employee cost increases relating to Social
Work within the Health and Social Care Partnership are summarised within
paragraph 4.6.3. 
Page 123

Page 124

2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Pay Award 3,000 6,061 9,182 12,366 15,613
Increments 690 1,380 2,070 2,760 3,450
Total Employee Cost
Changes
3,690 7,441 11,252 15,126 19,063 
4.4 Non-Pay Inflation 
4.4.1 Over the last few years, the Council have only included non-pay inflation within
the budget where it was deemed to be unavoidable or inescapable.  In terms of
the budget outlook, only unavoidable/inescapable non-pay inflation is built into
the best case and mid-range scenarios with a general inflation allowance over
and above this built into the worst case.   
4.4.2 Given the current instability around inflation rates officers continue to review
areas of non-pay inflation of significant value and volatility on an ongoing basis. 
The principle of only budgeting for unavoidable/inescapable remains, however, it
has to be noted that in this current financial climate, some budgets with no
inflation allowed for are now stretched beyond the point of containing the cost
within budget and therefore the budget will now buy less than what it used to be
able to buy (so in effect, we will see some cuts as a result). 
4.4.3 When creating a budget outlook for future years, there is a risk that inflation
assumptions could change during the year.  Due to the current inflation
uncertainty, it would be prudent to include a contingency for other inflation
increases not included in the calculations.  A contingency allowance of £0.500m
is included within the worst case scenario and a £0.250m allowance included
within the mid-range scenario each year.  No contingency is included within the
best case scenario.  This contingency will either be required, reduced or removed
to reflect changing circumstances before the 2023-24 budget process.   
4.4.4  The table below summarises the non-pay inflation increases in the mid-range
scenario for Council services since last reported on 16 June 2022 with more
detail available in Appendix 2.  The non-pay inflation increases relating to Social
Work within the Health and Social Care Partnership are summarised within
paragraph 4.6.3. 
Inflation Category 2023-24
Previous
estimates
£000
2023-24
Updated
estimates
£000
Increase
£000
Utilities - Electricity, Gas, Oil, Water 1,177 1,190 13
Street Lighting Electricity 116 116 0
Vehicle Fuel 62 60 (2)
Central Repairs - Outside Contractors 57 66 9
Waste PPP/Landfill Tax 502 502 0
NPDO/HUB Schools 1,024 1,034 10
Community Pool Subsidies 60 65 5
Residential Schools 91 91 0
Page 124

Page 125

Pre-Primary Partner Providers 86 181 95
ICT 123 123 0
Catering Purchases and Milk 309 309 0
Insurance 0 146 146
Bitumen – Roads 0 158 158
Contingency for unidentified/insufficient
inflation estimate
250 250 0
Total 3,857 4,291 434 
4.4.6 The inflation for years 2024-25 to 2027-28 is noted in the table below and is
based on future years estimates of inflation at this point it time.  It may be that the
inflation could rise to a peak over the next couple of years and then fall again and
this would alter the estimates in the table below, however, this is very difficult to
predict and the estimates will be kept under review.   
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Unavoidable/Inescapable 7,271 10,476 13,926 17,641
Total Non-Pay Inflation 7,271 10,476 13,926 17,641 
4.5 Cost and Demand Pressures 
4.5.1  Over the last few years, services have worked on the basis of having to contain
any cost and demand pressures within current resources, however, there are a
number of cost and demand pressures already identified for Council services
which were reported as part of the budget in February 2022.  Since the Policy
and Resources Committee on 16 June 2022 the following changes have been
made to the cost and demand pressures: 
 New - Increased cost of salt for Winter Maintenance
 New - Cease use of red diesel
 New - Insurance payments. 
Officers are currently assessing the budget required in respect of the provision for
1140 hours.  The Scottish Government reduced the funding for this area of spend
in 2022-23 and it is likely that this may create a cost pressure for future years. 
The level of the cost pressure has not been quantified as yet and will be updated
within a future budget outlook.   
4.5.2  As with inflation, when creating a budget outlook beyond one year, there is a risk
that unknown cost and demand pressures will emerge that have not been
included within the outlook.  It is suggested that no allowance for this is included
within the best case scenario, a £0.500m general allowance is included within the
worst case and a £0.250m allowance included within the mid-range scenario
each year. 
4.5.3 The cost pressures are detailed in appendix 3 and are summarised in the table
below and will be subject to review during the financial year.   
Page 125

Page 126

4.5.4  2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Universal Credit – HB
Admin Grant
40 80 120 160 200
Oracle Fusion 35 35 35 35 35
ASN Support 0 75 206 206 206
SEEMiS Membership Fees 9 11 13 16 16
Sustainable rate for partner
providers
342 327 327 327 327
Election costs 0 0 0 0 300
HR System 100 (50) (50) (50) (50)
Waste 7 25 78 (91) (91)
Compliance with BMW Ban 0 400 1,600 1,150 0
Local Development Plan 0 50 0 50 0
House Loans 19 19 19 19 19
Parking 15 15 15 15 15
IT – Increased bandwidth in
schools
26 26 26 26 26
Salt for Winter Maintenance 163 163 163 163 163
Cessation of red diesel 78 78 78 78 78
Insurance 414 414 414 414 414
Allowance for pressures in
future years
250 500 750 1,000 1,250
Total Cost and Demand
Pressures 
1,498 2,168 3,794 3,518 2,908 
4.5.5 The cost and demand pressures relating to Social Work within the Health and
Social Care Partnership are summarised within paragraph 4.6.3. 
4.6 Health and Social Care Partnership 
4.6.1  The Council, at the budget meeting on 24 February 2022, agreed a base
allocation to the HSCP of £69.005m for 2022-23 as well as indicative flat cash
allocations for 2023-24 to 2026-27.  On 2 March 2022 the Local Government
Finance Circular 1/2022 was published which distributed additional funding of
which £4.037m was required to be passed to the HSCP, therefore their allocation
increased from £69.005m to £73.042m.  
4.6.2 In the budget outlook, I have assumed flat cash allocations across all scenarios.
These are only assumptions and it will be a matter for Council to consider as part
of the budget process next year.   
4.6.3 Social Work services have already identified a number of cost and demand
pressures and these are summarised below and included within Appendix 4 for
information purposes.  It is expected that the HSCP absorb their cost and
demand pressures from their funding allocation.  Note that these only extend to
three years rather than the five years within this Council budget outlook.   
2023-24
£000
2024-25
£000
2025-26
£000
Pay Inflation 1,335 2,671 4,033
Page 126

Page 127

Pay Increments 103 206 309
Non-Pay Inflation 3,490 6,981 10,680
Care Services for Younger Adults 412 832 1,261
Adult Services - Supported Living 344 686 1,029
Continuing Care for Looked After
Children
250 500 750
Kintyre Care Centre 750 750 750
Unknown Cost and Demand
Pressures
500 1,000 1,500
Total Cost Increase estimates
for Social Work
7,184 13,626 20,312 
4.7 Estimated Budget Gap PRIOR to Measures to Balance the Budget 
4.7.1 The budget gap in the mid-range scenario after allowing for the current base
commitments, employee adjustment, non-pay inflation and cost and demand
pressures is summarised in the table below.  This is the budget gap prior to
factoring in any previous savings decisions or potential options towards balancing
the budget. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Base Budget 271,234 271,250 271,259 271,268 271,277
Employee Cost Changes 3,690 7,441 11,252 15,126 19,063
Non-Pay Inflation 4,291 7,271 10,476 13,926 17,641
Cost and Demand
Pressures 
1,498 2,168 3,794 3,518 2,908
Total Estimated
Expenditure
280,713 288,130 296,781 303,838 310,889
Estimated Funding 270,421 268,558 266,718 264,900 263,105
Estimated Budget
Surplus / (Gap)
Cumulative
(10,292) (19,572) (30,063) (38,938) (47,784) 
4.8 Measures to Balance the Budget 
4.8.1 In previous years, a general inflationary increase of 3% has been applied to fees
and charges.  For the budget outlook a range of between 2% (worst case) and
4% (best case) with a mid-range of 3%.  The Council may consider, that in light of
the increasing inflation we are experiencing on many cost areas, that it would be
appropriate to increase the fees and charges inflation to a higher level.   
4.8.2 A number of policy options were agreed at the Council meeting on 24 February
2022 that impacted on 2023-24 and beyond.   These are now factored into the
budget outlook, reducing the budget gap. 
4.8.3 In terms of Council Tax, a 3% increase has been assumed across all scenarios,
this being the increase applied in 2022-23.  It will be a matter for Council to
decide the level of Council Tax increase.   
Page 127

Page 128

4.8.4 In respect of Live Argyll, at the budget meeting on 24 February 2022, Council
agreed to defer the proposed 3% reduction in the management fee for 2022/23
and noted that this will be applied in 2023-24 and will be subject to any future
budget decisions. 3% of the 2022-23 management fee equates to £0.122m and
this reduction has been built into the budget outlook from 2023-24 onwards.  No
further reduction has been built in, this would be a matter for Council to consider. 
4.8.5  The table below summarises the proposed measures to balance the budget in
the mid-range scenario. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Fees and Charges
Increase
356 722 1,099 1,488 1,888
Management/Operational
Savings February 2021
20 20 20 20 20
Policy Savings February
2021
128 128 128 128 128
Policy Savings agreed
February 2022
3 6 6 6 6
Council Tax Increase  1,683 3,450 5,278 7,170 9,127
Reduction to Live Argyll
Management Fee
122 122 122 122 122
Total Measures to
Balance the Budget
2,312 4,448 6,653 8,934 11,291 
4.9 Estimated Budget Gap AFTER Measures to Balance the Budget 
4.9.1 The table below summarises the estimated budget gap in the mid-range
scenario. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Estimated Budget Gap
Prior to Measures to
Balance Budget
(10,292) (19,572) (30,063) (38,938) (47,784)
Savings Measures 2,312 4,448 6,653 8,934 11,291
Estimated Budget
Surplus / (Gap)
Cumulative
(7,980) (15,124) (23,410) (30,004) (36,493)
Estimated Budget
Surplus / (Gap) In Year
(7,980) (7,144) (8,286) (6,594) (6,489) 
4.9.2 In the mid-range scenario, the budget gap estimated over the five year period
2023-24 to 2027-28 is £36.493m with a gap of £7.980m in 2023-24.   
4.9.3 The budget gap in the best case scenario over the five years is £25.060m with a
gap of £5.367m in 2023-24 and in the worst case scenario, the budget gap over
the five years is £79.798m with a gap of £15.443m in 2023-24.  A summary of all
three scenarios is included within Appendix 1.
Page 128

Page 129

4.9.4 The changes from the previous anticipated outlook reported to the Policy and
Resources Committee on 16 June 2022 are summarised in the table below: 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Previously reported
budget surplus / (gap)
Cumulative
(6,891) (13,385) (20,940) (26,710) (32,275)
Increase to cost
pressures
(655) (655) (655) (655) (655)
Increase to Non Pay
Inflation
(434) (1,084) (1,815) (2,639) (3,563)
Revised Budget
Surplus / (Gap)
Cumulative
(7,980) (15,124) (23,410) (30,004) (36,493) 
4.10 Budget Working Group 
4.10.1 As part of the 2021-22 and 2022-23 budgets, a cross party Budget Working
Group (BWG) was established comprising of six Members from the
administration, three Members from the opposition and two Trade Union
representatives. The BWG did not have any decision making authority but could
report to and make recommendations to either the Council or the Policy and
Resources Committee.  Its primary purpose was to engage with officers and
provide scrutiny on the identification of savings options as they are developed. 
4.10.2 Given the significant budget gap over the next five years it was agreed at Policy
and Resources Committee on 16 June 2022 that a similar group will be
established to support the 2023-24 budget approach and for the group to begin
discussions in August 2022 to allow sufficient time to address the financial
challenges ahead.  Officers are making arrangements for the first meeting to take
place in August. 
5. CONCLUSION 
5.1 In the mid-range scenario, the budget gap estimated over the five year period
2023-24 to 2027-28 is £36.493m with a gap of £7.980m in 2023-24.   Council
officers are continuing to further develop savings options during 2022-23 and
these will be presented to members at a future date to help balance the budget in
future years. 
5.2 
5.3 
This is a very challenging budget outlook position and the level of Scottish
Government grant and the pay award are the two assumptions that could alter
the figures significantly.  Both will be kept under close review and the budget
outlook updated as and when further information becomes available.   
It should be noted that service concession flexibility has now been agreed by the
Cabinet Secretary for Finance and the Economy and a draft consultation draft of
the statutory guidance was issued on 18 July with responses due back by 12
Page 129

Page 130

August.  The flexibility, should the Council approve to use, will provide a one-off
gain in addition to a recurring saving.  Officers will work through the draft
guidance and after approval of the guidance be able to report what this may
mean for Argyll and Bute Council.   
5.4 A cross party budget working group will be established to provide scrutiny on the
identification of savings options with early engagement with services users and
stakeholders to help inform and develop savings options within the financial
envelope. 
6. IMPLICATIONS 
6.1 Policy -  Sets out the budget outlook that provides the financial
envelope for policy decisions.
6.2 Financial -  Sets best, worst and mid-range scenarios in respect of
the budget outlook.  The medium to longer term
financial strategy is being updated and the Council are
actively continuing to pursue opportunities to mitigate
against future budget gaps. 
6.3 Legal -  None directly from this report but Council will need to
balance the budget. 
6.4 HR -  None directly from this report but there is a strong link
between HR and budgets.
6.5 Fairer Scotland Duty - See below
6.5.1 Equalities None directly from this report but any proposals to
address the estimated budget gap will need to consider
equality issues.
6.5.2 Socio Economic Duty None directly from this report but any proposals to
address the estimated budget gap will need to consider
socio economic issues.
6.5.3 Islands Duty None directly from this report but any proposals to
address the estimated budget gap will need to consider
any island specific issues. 
6.6 Climate Change The Council is committed to addressing climate change
and reviews how Services are delivering this on an
ongoing basis within the available budget resources.
6.7 Risk -  None directly from this report but any proposals to
address the estimated budget gap will need to consider
risk.
6.8 Customer Service - None directly from this report but any proposals to
address the estimated budget gap will need to consider
customer service. 
Kirsty Flanagan
Executive Director/Section 95 Officer
20 July 2022 
Policy Lead for Finance and Commercial Services:  Councillor Gary Mulvaney 
Page 130

Page 131

APPENDICES: 
Appendix 1 – Budget Outlook, Best, Worst and Mid-Range Scenarios
Appendix 2 – Non Pay Inflation
Appendix 3 – Cost and Demand Pressures (Council Services)
Appendix 4 – Cost and Demand Pressures (Social Work) 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 131

Page 132

BUDGET OUTLOOK 2023-24 to 2027-28 APPENDIX 1
POLICY AND RESOURCES COMMITTEE - 11 AUGUST 2022
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Base Budget 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127
Base Budget Adjustments 2,107 2,123 2,132 2,141 2,150 2,107 2,123 2,132 2,141 2,150 2,107 2,123 2,132 2,141 2,150
Revised Base Budget 271,234 271,250 271,259 271,268 271,277 271,234 271,250 271,259 271,268 271,277 271,234 271,250 271,259 271,268 271,277
Pay Award 2,978 6,016 9,114 12,274 15,497 2,978 6,016 9,114 12,274 15,497 7,445 15,262 23,470 32,089 41,138
Pay Increments 345 690 1,035 1,380 1,725 690 1,380 2,070 2,760 3,450 690 1,380 2,070 2,760 3,450
Additional Teacher Costs (23) 23 23 24 24 22 45 68 92 116 (23) 23 23 24 24
Total Employee Cost Changes (Council Services) 3,300 6,729 10,172 13,678 17,246 3,690 7,441 11,252 15,126 19,063 8,112 16,665 25,563 34,873 44,612
Non-Pay Inflation - Council Services 3,867 6,639 9,610 12,794 16,207 4,291 7,271 10,476 13,926 17,641 6,316 11,103 16,147 21,470 27,097
Housing Benefits Admin Grant 40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
Oracle Fusion running costs 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35
ASN Support 0 0 198 198 198 0 75 206 206 206 0 145 444 444 444
SEEMIS Membership Fees 9 11 13 16 16 9 11 13 16 16 9 11 13 16 16
Sustainable Rate for Partner Providers 342 327 327 327 327 342 327 327 327 327 342 327 327 327 327
Election Costs 0 0 0 0 250 0 0 0 0 300 0 0 0 0 350
Software support for a  new HR system & Backfill for project
team. 50 (50) (50) (50) (50) 100 (50) (50) (50) (50) 150 (50) (50) (50) (50)
Waste 7 25 78 (91) (91) 7 25 78 (91) (91) 7 25 78 (91) (91)
Compliance with BMW Ban 0 200 800 800 0 0 400 1,600 1,150 0 0 875 3,500 1,500 0
Planning (Local Development Plan) 0 50 0 50 0 0 50 0 50 0 0 50 0 50 0
House Loans 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
Parking 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
IT - increased bandwidth in schools 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26
Increase in cost of Salt for Winter Maintenance 147 147 147 147 147 163 163 163 163 163 179 179 179 179 179
Cessation of Red Diesel usage 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78
Rightsize Council insurance budgets 414 414 414 414 414 414 414 414 414 414 414 414 414 414 414
Allowance for Cost and Demand Pressures Future Years
0 0 0 0 0 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500
Total Cost and Demand Pressures 1,182 1,377 2,220 2,144 1,584 1,498 2,168 3,794 3,518 2,908 1,814 3,229 6,698 5,122 4,462
Total Estimated Expenditure PRIOR to measures to
balance the budget 279,583 285,995 293,261 299,884 306,314 280,713 288,130 296,781 303,838 310,889 287,476 302,247 319,667 332,733 347,448
Scottish Government Grant 214,895 213,821 212,752 211,688 210,629 213,817 211,679 209,562 207,466 205,391 212,736 209,545 206,402 203,305 200,256
Specific Funding for Additional Teachers 515 512 509 506 503 513 508 503 498 493 510 502 494 487 480
Council Tax 56,367 56,790 57,216 57,645 58,077 56,091 56,371 56,653 56,936 57,221 55,815 55,955 56,095 56,235 56,376
Total Funding 271,777 271,123 270,477 269,839 269,209 270,421 268,558 266,718 264,900 263,105 269,061 266,002 262,991 260,027 257,112
Budget Surplus / (Gap) PRIOR to measures to balance the
budget (7,806) (14,872) (22,784) (30,045) (37,105) (10,292) (19,572) (30,063) (38,938) (47,784) (18,415) (36,245) (56,676) (72,706) (90,336)
Measures to Balance the Budget:
Fees and Charges 475 963 1,465 1,984 2,517 356 722 1,099 1,488 1,888 237 481 733 992 1,259
Live Argyll - 3% decrease to management fee 122 122 122 122 122 122 122 122 122 122 122 122 122 122 122
Management/Operational Savings agreed February 2021
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Policy savings agreed February 2021 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128
Policy savings reported Agreed February 2022 3 6 6 6 6 3 6 6 6 6 3 6 6 6 6
Council Tax Increase 1,691 3,445 5,265 7,152 9,109 1,683 3,425 5,227 7,092 9,021 1,674 3,403 5,188 7,031 8,933
Council Tax Increase (Growth element) 0 34 69 105 143 0 25 51 78 106 0 17 34 52 70
Total Measures to Balance the Budget 2,439 4,718 7,075 9,517 12,045 2,312 4,448 6,653 8,934 11,291 2,184 4,177 6,231 8,351 10,538
Budget Surplus / (Gap) Cumulative AFTER measures to
balance the budget (5,367) (10,154) (15,709) (20,528) (25,060) (7,980) (15,124) (23,410) (30,004) (36,493) (16,231) (32,068) (50,445) (64,355) (79,798)
Budget Surplus / (Gap) In Year AFTER measures to balance
the budget (5,367) (4,787) (5,554) (4,819) (4,532) (7,980) (7,144) (8,286) (6,594) (6,489) (16,231) (15,837) (18,378) (13,910) (15,443)
Best Case Scenario Worst Case ScenarioMid-Range Scenario
Page 132

Page 133

NON-PAY INFLATION (COUNCIL) Appendix 2
Service Category Basis of Inflation
Inflation
Percentage
Mid Range
2023/24
Council Wide Electricity
Due to current market condition for electricity 20% increase mid range, with a 0.5%
tolerance for best and worst case.
20.00% 481,154
Council Wide Gas
Due to current market condition for gas 75% increase mid range, with a 0.5% tolerance
for best and worst case.
75.00% 371,037
Council Wide Heating Oils
Due to current market condition for heating oils 100% increase mid range, with a 0.5%
tolerance for best and worst case.
100.00% 266,842
Council Wide Solid Fuel
Based on estimates provided by facility services with a 0.5% tolerance for best and
worst case.
8.00% 18,430
Council Wide Water Charges Current rate of inflation with a 0.5% tolerance for best and worst case. 9.10% 53,241
Council Wide Vehicle Fuel Historic rate carried forward from last year - will be reviewed during 2022-23
4.97% 60,377
Council Wide Central Repairs - Outside Contractors
Based on labour and materials costs survey data from the Royal Institute of Chartered
Surveyors (RICS) and information from the property team on the typical allocation of
their costs between labour and materials.
3.40% 66,006
Council Wide Contingency for unidentified/insufficient inflation estimate £250k built in to mid-range and £500k built in to worst case scenario 250,000
Council Wide Insurances Current rate of inflation with a 0.5% tolerance for best and worst case. 9.10% 146,114
1,713,201
Education Pre-Primary Partner Provider Uplift
Brought into line with the estimate within Social Work for the impact of the Real Living
Wage on service costs.
5.00% 180,699
Education External School Placements Based on prior year uplifts 8.00% 90,590
Commercial Services Catering Purchases
Figure used by facility services based on national estimates for year 1 with a 0.5%
tolerance for best and worst case.
15.00% 308,543
Legal & Regulatory Support Leisure SLA-MAKI/Islay Pools
Based on RPI at February 2022 with a 0.5% tolerance in the best and worst case
scenarios.
8.18% 13,757
Legal & Regulatory Support Leisure SLA-Atlantis Based on RPI at May 2022 with a 0.5% tolerance in the best and worst case scenarios.
9.24% 51,161
Legal & Regulatory Support NPDO-Variable Element Based on year on year RPI uplift with a 0.5% tolerance for best and worst case.
8.18% 599,843
Legal & Regulatory Support NPDO-Utilities Rebate RPI at February 2022 with a 0.5% tolerance for best and worst case. 8.20% -23,945
Legal & Regulatory Support NPDO-Electricity
Due to current market condition for electricity 20% increase mid range, with a 0.5%
tolerance for best and worst case.
20.00% 89,930
Legal & Regulatory Support NPDO-Gas
Due to current market condition for gas 75% increase mid range, with a 0.5% tolerance
for best and worst case.
75.00% 119,481
Legal & Regulatory Support NPDO-Heating Oil
Due to current market condition for heating oils 100% increase mid range, with a 0.5%
tolerance for best and worst case.
100.00% 68,801
Legal & Regulatory Support NPDO-LPG
Due to current market condition for gas 75% increase mid range, with a 0.5% tolerance
for best and worst case.
75.00% 53,900
Legal & Regulatory Support NPDO-Water Current rate of inflation with a 0.5% tolerance for best and worst case. 9.10% 31,906
Legal & Regulatory Support HUB-Variable Element Based on year on year RPI uplift with a 0.5% tolerance for best and worst case.
8.18% 93,883
1,678,549
Customer and Support Services ICT Historic rate carried forward from last year - will be reviewed during 2022-23
15.00% 123,000
Roads and Infrastructure Waste PPP-Private Contractor Inflation Based on RPIX at February 2022 with a 0.5% tolerance for best and worst case.
7.09% 465,049
Roads and Infrastructure Waste PPP-Central Government Inflation
Based on Landfill Tax increase between 21/22 and 22/23 with a 0.5% tolerance for best
and worst case.
1.96% 36,765
Roads and Infrastructure Roads - Bitumen for Road Surfacing Based on price increases in 2022/23 with a 0.5% tolerance for best and worst case.
40.00% 158,512
Roads and Infrastructure Electricity - Street Lighting
Due to current market condition for electricity 20% increase mid range, with a 0.5%
tolerance for best and worst case.
20.00% 116,305
899,631
4,291,381
Council Wide Total
Executive Director Douglas Hendry - Total
Executive Director Kirsty Flanagan - Total
Total Non-Pay Inflation in the Mid Range
Page 133

Page 134

COUNCIL COST AND DEMAND PRESSURES 2023-24 to 2027-28
Department Service Cost/Demand Pressure 2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
Chief Executive's Unit Financial Services Universal Credit “Full” Service went live in Sept 2018, but managed migration has
been deferred to 2021 and will not be completed until 2024. The DWP will reduce
the Housing Benefit Administration Subsidy they pay to the Council as some
claimants come off of Housing Benefit processed by Council staff and go onto
Universal Credit processed by the DWP.  The Council’s caseload has reduced
marginally since implementation of Universal Credit but it is hard to predict just how
quickly the rest of the working age caseload will migrate from Housing Benefit to
Universal Credit between now and 2024.  These figures represent our best estimates
at this time.
40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
Chief Executive's Unit Financial Services Implementation of new financial ledger system - Oracle Fusion Project 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35
Executive Director -
Douglas Hendry
Education The demand for ASN support in Argyll and Bute has continued to grow with a
significant increase in, and early identification of children and young people
presenting with complex additional support needs, including mental health
difficulties.  It is anticipated that growth continues over the next 5 years however
the extent of this growth is difficult to determine.  Scottish Government statistics
show that the number of pupils identified with ASN has increased markedly since
2010 and there continue to be year on year increases. These increases are likely due
to continued improvements in recording and the introduction of the additional need
types 'Child plans' and ‘Other’ in 2011.   Scottish Government statistical datasets
show that the percentage of school roll in mainstream schools of pupils with ASN
has increased by approximately 3% year on year.  Within many authorities, this
means increased numbers of children accessing specialist provision.
0 0 198 198 198 0 75 206 206 206 0 145 444 444 444
Executive Director -
Douglas Hendry
Education The SEEMiS group, provider of the Council's Education Management Information
System, recently reviewed their long term financial plan and refreshed it to cover
the period 2021/22 to 2025/26.  As a result of this exercise there were implications
on Membership fees with a cost pressure on the Education service arising from
financial year 2023/24.  Indicative membership fees were provided for financial
years 2021/22 to 2022/23 and these have been factored in accordingly.
9 11 13 16 16 9 11 13 16 16 9 11 13 16 16
Executive Director -
Douglas Hendry
Education The Council has had a requirement to deliver 1140 hours of Early Learning and
Childcare from August 2021. The Council has been notified that the ring fenced
funding will be reduced by £1.124m from 2022-23. Also, as part of the 1140
expansion programme, the Scottish Government 'Funding Follows the Child'
guidance, requires local authorities to set a rate locally that is paid to funded
providers in the private and third sectors, including childminders, to deliver the
funded entitlement that allows them to deliver a high quality ELC experience for all
children. This rate should be sustainable and reflect national policy priorities,
including funding to enable payment of the real Living Wage to all childcare workers
delivering the funded entitlement and have a margin for re-investment built in. The
service has worked hard to mitigate the effects of this and has reduced expenditure
as far as possible.  However there remains a funding gap, the service are able to
cover the over spend for 2022-23 from carry forwards so the cost pressure is
requested from 2023-24 onwards. The service will continually review their plans
looking for efficiencies where possible.
342 327 327 327 327 342 327 327 327 327 342 327 327 327 327
Executive Director -
Douglas Hendry
Legal and Regulatory
Services
Estimated cost (to be borne by the Council)  of carrying out local Government
elections in May 2027 (and in financial year 2027/28). Operating approx. 100 polling
stations and carrying out poll and count for 11 Multi member wards – requiring 11
separate counts
0 0 0 0 250 0 0 0 0 300 0 0 0 0 350
Executive Director -
Kirsty Flanagan
HR Costs for a project team for a  new HR system & Backfill . This is a total new system
build. 50 -50 -50 -50 -50 100 -50 -50 -50 -50 150 -50 -50 -50 -50
Best Case Mid Range Scenario Worst Case
APPENDIX 3
Page 134

Page 135

COUNCIL COST AND DEMAND PRESSURES 2023-24 to 2027-28
Department Service Cost/Demand Pressure 2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
Best Case Mid Range Scenario Worst Case
APPENDIX 3
Executive Director -
Kirsty Flanagan
Waste Additional costs derived from the current waste model. Note that the treatment of
waste going forward has not been fully costed due to uncertainty as to how the
council will deal with the Bio Municipal Waste ban and the Deposit Return Scheme.
Pressure has increased due to an updated waste model.
7 25 78 (91) (91) 7 25 78 (91) (91) 7 25 78 (91) (91)
Executive Director -
Kirsty Flanagan
Waste Achieving compliance with ban on biodegradable municipal waste in 2025.  This is
the estimated revenue costs from potential scenarios, remaining in or coming out of
the current waste PPP contract.  Coming out of the Waste PPP contract would
create an additional one-off cost.  There are also capital cost implications that are
not included within these estimates.  Due to the complexity of the model, estimates
are subject to change. 
0 200 800 800 0 0 400 1,600 1,150 0 0 875 3,500 1,500 0
Executive Director -
Kirsty Flanagan
Planning Local development plan will require to be done under the new Planning legislation
which is a revised process from the current one and will have a 10 year life. The new
process has 2 stages where there is likely to be a cost pressure - a gate check
followed by an examination some time later.
0 50 0 50 0 0 50 0 50 0 0 50 0 50 0
Executive Director -
Kirsty Flanagan
Housing Rightsize budget for House Loans which is a historic budget which has simply been
rolled forward year on year
19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
Executive Director -
Kirsty Flanagan
Parking Loss in income at Glen Loin Car park, Arrochar due to end of lease and responsibility
for car park returning to owners, Luss Estates
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
Executive Director -
Kirsty Flanagan
IT Increased bandwidth for schools to allow digital transformation to support the move
to online learning
26 26 26 26 26 26 26 26 26 26 26 26 26 26 26
Executive Director -
Kirsty Flanagan
Roads Increased cost of Salt for Winter Maintenance, average useage of 15,000 tonnes of
salt over the winter period would equate to £163k of additional costs.
147 147 147 147 147 163 163 163 163 163 179 179 179 179 179
Executive Director -
Kirsty Flanagan
Roads Change at 1 April 2022 to stop the use of Red Diesel in certain vehicles has resulted
in an unavoidable increas in fuel costs in Roads and Infrastructure.
78 78 78 78 78 78 78 78 78 78 78 78 78 78 78
Council Wide Council Wide Rightsize budget for Council insurances which is a historic budget that requires to be
increased in line with the current insurance costs.
414 414 414 414 414 414 414 414 414 414 414 414 414 414 414
Council Wide Council Wide General provision for unidentified Cost and Demand Pressures 0 0 0 0 0 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500
TOTAL 1,182 1,377 2,220 2,144 1,584 1,498 2,168 3,794 3,518 2,908 1,814 3,229 6,698 5,122 4,462
Page 135

Page 136

SOCIAL WORK COST AND DEMAND PRESSURES - 2023-24 to 2025-26 APPENDIX 4
Service Cost/Demand Pressure 2023-24
£000
2024-25
£000
2025-26
£000
2023-24
£000
2024-25
£000
2025-26
£000
2023-24
£000
2024-25
£000
2025-26
£000
All Social Work Estimated Pay inflation reflecting a best case of 1%, mid range of 2% and worst
case of 3%.
668 1,336 2,011 1,335 2,671 4,033 1,342 2,685 4,068
All Social Work Estimated Pay increments, best case is that 50% of the incremental changes based
on 2022/23 are absorbed and in the mid-range and worst case, the increase is in
line with the increase in 2022/23.
52 103 155 103 206 309 103 206 309
All Social Work Non-pay inflation, best and worst case based on unavoidable/inescapable inflation
and worst case.
3,014 5,982 9,110 3,385 6,764 10,346 3,756 7,524 11,541
All Social Work Non-pay inflation impact of payroll inflation on NHS posts which are recharged to
Social Work.
96 196 302 105 217 334 105 217 334
Adult Care Younger Adults Demand Growth (Excluding Physical Disability): There has been
continuing increase in demand for care and support services for profoundly
disabled younger adults (ie under 65) whose parents have historically provided
care but are no longer able to.  The best case assumes a 1% increase in spending
reflecting the limited service capacity in the area, the mid-range reflects 2% growth
and the worst case reflects 3% growth.
170 342 516 341 689 1,044 511 1,038 1,582
Adult Care Younger Adults Demand Growth - Physical Disability: There has been continuing
increase in demand for care and support services for profoundly disabled younger
adults (ie under 65) whose parents have historically provided care but are no
longer able to.  The best case assumes a 1% increase in spending reflecting the
limited service capacity in the area, the mid-range reflects 2% growth and the
worst case reflects 3% growth.
35 71 107 71 143 217 106 215 328
Adult Services Learning Disability Budget Adjustment - The Learning Disability Supported Living
budget is carrying a recurring unbudgeted commitment of circa £743k which is
contributing to the recurring overspend on the Social Work budget. To address this
situation, it is proposed to realign the budget over the three year period from
2023/24 to 2025/26 whilst also reviewing cases and redesigning services. The
adjustment will be reviewed annually to reflect spending reductions delivered as
well as any changes to funding and practice resulting from the implementation of
the Independent Review of Adult Social Care.
248 495 743 248 495 743 248 495 743
Adult Services Physical Disability Budget Adjustment - The Physical Disability budget is carrying a
recurring unbudgeted commitment of circa £89k which is contributing to the
recurring overspend on the Social Work budget. To address this situation, it is
proposed to realign the budget over the three year period from 2023/24 to
2025/26 whilst also reviewing cases and redesigning services. The adjustment will
be reviewed annually to reflect spending reductions delivered as well as any
changes to funding and practice resulting from the implementation of the
Independent Review of Adult Social Care.
30 60 89 30 60 89 30 60 89
Best Case Mid Range Worst Case
Page 136

Page 137

Service Cost/Demand Pressure 2023-24
£000
2024-25
£000
2025-26
£000
2023-24
£000
2024-25
£000
2025-26
£000
2023-24
£000
2024-25
£000
2025-26
£000
Best Case Mid Range Worst Case
Adult Services Mental Health Budget Adjustment - The Mental Health budget is carrying a
recurring unbudgeted commitment of circa £197k which is contributing to the
recurring overspend on the Social Work budget. To address this situation, it is
proposed to realign the budget over the three year period from 2023/24 to
2025/26 whilst also reviewing cases and redesigning services. The adjustment will
be reviewed annually to reflect spending reductions delivered as well as any
changes to funding and practice resulting from the implementation of the
Independent Review of Adult Social Care and any additional funding provided to
address mental health issues as a consequence of the COVID pandemic.
66 131 197 66 131 197 66 131 197
Children and
Families
Continuing Care demand for Looked After young people who are cared for by the
HSCP. The best case scenario is that the expected additional demand can be
funded from within existing resources as a result of planned improvements to the
service delivery model (eg shift away form high cost external residential care to
local foster and kinship care), the mid case reflects £250k per annum and the worst
case reflects £500k per annum.
0 0 0 250 500 750 500 1,000 1,500
All Social Work Allowance for unknown cost and demand pressures which could arise. The best
case assumes unknown pressures totalling £250k per annum, the mid range £500k
per annum and the worst case £750k per annum.
250 500 750 500 1,000 1,500 750 1,500 2,250
Adult Services Kintyre Care Centre - Potential cost pressure as a result of potential transfer of KCC
facility to HSCP Management.
750 750 750 750 750 750 900 900 900
TOTAL COST AND DEMAND PRESSURES 5,378 9,966 14,730 7,184 13,626 20,312 8,417 15,971 23,841
Page 137

Page 138

This page is intentionally left blank

Page 139

ARGYLL AND BUTE COUNCIL    POLICY AND RESOURCES COMMITTEE           
CUSTOMER SUPPORT SERVICES  11 AUGUST 2022 
SERVICE ANNUAL PERFORMANCE REVIEWS 2021/22 – 
FINANCIAL SERVICES
COMMUNITY PLANNING & DEVELOPMENT
LEGAL & REGULATORY SERVICES
COMMERCIAL SERVICES
CUSTOMER SUPPORT SERVICES 
1.0 EXECUTIVE SUMMARY 
1.1 The Council’s Performance and Improvement Framework (PIF) sets out the
presentation process for regular performance reporting. 
This paper presents the Policy and Resources Committee (P&R) with the Service
Annual Performance Reviews and Scorecard 2021/22 for the above Services. 
1.2 It is recommended that the P&R reviews and approves the Service Annual
Performance Reviews (Service APRs) and Scorecards 2021/22 as presented prior
to publishing on the Council Website. 
Page 139 Agenda Item 6

Page 140

ARGYLL AND BUTE COUNCIL   POLICY AND RESOURCES COMMITTEE   
CUSTOMER SUPPORT SERVICES     11 AUGUST 2022 
SERVICE ANNUAL PERFORMANCE REVIEWS 2021/22– 
FINANCIAL SERVICES
COMMUNITY PLANNING & DEVELOPMENT
LEGAL & REGULATORY SERVICES
COMMERCIAL SERVICES
CUSTOMER SUPPORT SERVICES 
2.0 INTRODUCTION
2.1 The Council’s Performance and Improvement Framework (PIF) sets out the
presentation process for regular performance reporting. 
This paper presents the Policy and Resources Committee (P&R) with the Service
Annual Performance Reviews 2021/22 and Scorecards for the above Services. 
3.0 RECOMMENDATIONS
3.1 It is recommended that the P&R Committee reviews and approves the Service
Annual Performance Reviews (Service APRs) and Scorecards 2021/22 as presented
prior to publishing on the Council Website.
4.0 DETAIL
4.1 At the end of the financial year each Service presents a review that illustrates the
positive contribution to our communities, the significant challenges and any
consultations that the Service has carried out.   
4.2 Case Studies contained within the review have been identified by Senior Officers and
provide a broad range of imaginative and exceptional examples of service delivery
throughout Argyll and Bute.
4.3 Each Service APR is supported by the Services’ year-end Scorecard and as expected
due to the nature of service delivery the Service APRs differ in style and content.
4.4 Following approval of the Service APRs a selection of outstanding and informative
examples will be collated for inclusion in the Council Annual Report 2021/22 in due
course.
4.5 The Service Annual Performance Reviews and Scorecards 2021/22 are presented in
the following order:-
Page 140

Page 141

 Chief Executive’s Unit 
 Financial Services
 Community Planning and Development
 Legal and Regulatory Support
 Commercial Services
 Customer Support Services 
5.0 IMPLICATIONS
5.1 Policy None
5.2 Financial None
5.3  Legal  The Council has a duty to deliver best value under the Local Government in
Scotland Act 2003. Publication forms part of our statutory Public Performance
Reporting duty
5.4  HR None
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics None
5.5.2   Socio-economic Duty None
5.5.3  Islands None
5.6. Climate Change None
5.7  Risk Ensures that all our performance information is reported in a balanced manner
5.8  Customer Service None 
Kirsty Flanagan, Executive Director with responsibility for
Customer Support Services
13 July 2022     
Policy Leads: Councillors Gary Mulvaney                    
For further information contact: 
Jane Fowler, Head of Customer Support Services 01546 604466
Appendix 1
Service Annual Performance Reviews and Scorecards 2021/22
Page 141

Page 142

This page is intentionally left blank

Page 143

SERVICE ANNUAL PERFORMANCE REVIEW
1
NAME OF SERVICE: FINANCIAL SERVICES PERIOD: FINANCIAL YEAR 2021/22
1. DELIVERING OUR OUTCOMES 
Our case studies help illustrate the positive contribution the Service has made to our communities and provides examples of good service delivery. 
Corporate Outcome - People Live Active Healthier And Independent Lives
Business Outcome BO102: We Provide Support, Prevention And Opportunities To Help People Make Better Lifestyle Choices 
a) £521,815 in Scottish Welfare Fund grants were paid to support vulnerable people. 
b) The average processing time for New Housing Benefit claims was 25.19 days and 4.41 days for changes in circumstances against targets of 21 days and
6 days respectively. 
c) £906,187 of Discretionary Housing Payments was distributed to households in need. 
d) We have paid out £269,950 in grants to cover food and fuel for people in poverty and successfully referred them for support to advice agencies. As at
the year-end 1,007 families have been supported to maximise benefit income and reduced fuel costs to the value of £1.324m. 
e) Our Social Work Team successfully delivered two rates changes during the year in line with Scottish Government Policy to increase the basic pay of
carers and personal assistants who look after adults in our communities. 
Corporate Outcome - Our Economy Is Diverse And Thriving
Business Outcome BO110: We Support Businesses, Employment and Development Opportunities 
Success Measure: FIS110_01-Increase the total value of Non-Domestic Rates (NDR) relief awarded 
a) We worked alongside other Council colleagues to support the payment of £2.7 million to support local businesses, protect the local economy and
jobs, prevent business closure and promote economic recovery as lockdown restrictions eased and businesses started to re-open. 
b) We awarded nearly £24.5 million of Non-Domestic Rates reliefs to support local businesses.
Page 143

Page 144

SERVICE ANNUAL PERFORMANCE REVIEW
2
Corporate Outcome - Getting it right
Business Outcome BO115: We Are Efficient And Cost Effective 
a) We have implemented a new Counter Fraud Team on a two-year pilot basis to enhance the Council’s zero tolerance to fraud and protect the public
purse. During 2021-22 the team rebilled £659k as a direct consequence of their work and have recovered £572k of that total to date. 
b) We collected 96.28% of Council Tax exceeding the target of 96.00%. 
c) The External Audit of the 2020/21 Annual Accounts was completed by the statutory deadline and an unqualified Audit Certificate received. 
d) Positive External Audit Annual Audit Report received and reported to Policy and Resources Committee in December 2021. 
e) Financial monitoring packs were submitted to each Policy & Resources Committee. 
f) The average investment rate for 2021-22 was 0.418% compared to the average 7-day LIBID (London Interbank Bid Rate) rate of -0.74%. The
investments generated £0.485m of interest in 2021-22. 
g) The Creditors Team processed 96.6% of invoices due within 30 days, exceeding the target of 95.5%. 
h) The Payroll Team processed the 2021/22 Teacher’s pay rise within 1 month of being notified of the pay settlement, one of the few Councils to do so
by April 2022. 
i) The 2021/22 internal audit plan was fully completed and reported by the target date of the June Audit and Scrutiny Committee. 
j) The service closely monitored the financial impact of Covid on the Council throughout the year, regularly updating assumptions and projections, to
ensure that the Convention of Scottish Local Authorities (COSLA) returns were robust, and the Council would receive the appropriate levels of Covid
specific Scottish Government funding. 
Page 144

Page 145

SERVICE ANNUAL PERFORMANCE REVIEW
3
2. SIGNIFICANT CHALLENGES 
The significant challenges faced by the Service during 2021/22. These challenges either created specific pressures on the Success Measures or impacted
on delivery. Specific additional activity or mitigating actions were carried out to reduce the negative impact on service delivery. 
Corporate Outcome - People Live Active Healthier And Independent Lives
Business Outcome BO102: We Provide Support, Prevention And Opportunities To Help People Make Better Lifestyle Choices 
a) Due to financial impact of Covid on social care providers the Income Max team were under increased pressure to get contracts and payments to
providers for delivering care home services. The Social Work Finance Team continued to deliver a financial sustainability scheme on behalf of the
Scottish Government to provide financial support to local care providers to help them deal with the cost pressures placed upon them by the pandemic
which is an ongoing piece of work. 
b) The 300% weekly increase in the volume of Self Isolation Support Grants (SISG) received from December 2021 through to April 2022 due to Omicron
caused a significant challenge for the service. Benefit Assessor staff had to be redeployed to help with the administration of SISG and this introduced
delays in processing Housing Benefit. The service therefore failed to process new claims for Housing Benefit in 21 days. We were unable to recruit
additional Benefit Assessors locally to assist the service. 
Corporate Outcome - Our Economy Is Diverse And Thriving
Business Outcome BO110: We support businesses, employment and development opportunities 
a) Significant resource requirement to administer a range of Covid related Business Support Grants which required redeployment of staff in Revenues
and Benefits and Internal Audit and created increased pressure on Creditors and Treasury Management officers to manage the volume of payments
and movement in funds. 
Corporate Outcome - Getting it right 
Business Outcome BO115: We Are Efficient And Cost Effective 
a) The service has continued to deliver business as usual whilst undertaking additional work to manage and report on the wide range of additional Covid
funding provided by the Scottish Government to our front-line services.
Page 145

Page 146

SERVICE ANNUAL PERFORMANCE REVIEW
4
b) During the year, the service started a project to implement a new financial management system to replace Oracle system which had been in place for
several years and was reaching the end of its supported life. This is a substantial project which has been undertaken at pace to ensure that the new
Oracle Fusion system is in place before the existing system must be decommissioned at the end of July 2022. 
c) The service has been actively involved with ICT in exploring the benefits which could arise from the analysis of the data which the Council holds to
help identify vulnerable people who could benefit from support from the Council and/or our partners. We are also exploring how the data could be
used to support evidence-based decision making and service provision. 
d) The Revenues and Benefits Teams administered the Argyll and Bute Flexible Food Fund with partners Bute Advice and ALIenergy. During the year, the
Fund supported 1,000 to achieve a client gain of £1.325m and were highly commended by the Institute of Revenues Rating and Valuation at their
annual performance awards in the category Excellence and Innovation (Service Delivery). 
e) The Revenues and Benefits Team worked in partnership with the Social Work Finance Team and colleagues in Adult Social Care to implement an
improved process to support people entering care homes and their families through the assessment of their entitlement to funding towards their care
home placement. 
3. CONSULTATION AND ENGAGEMENT - WE ASKED, YOU SAID, WE DID…. 
The following are all the consultations and resulting actions that the Service has carried out during this period. 
a) We asked what could be done to reduce the numbers of people relying on foodbanks for support during the pandemic. Foodbank providers
advised us through the Argyll and Bute Community Food Forum that more welfare rights and fuel poverty related support and advice for people
with food insecurity attending the foodbanks would be beneficial. 
b) We continued to deliver the Argyll and Bute Flexible Food Fund which incentivises people in hardship to get this professional advice by making
two monthly payments to families, the first one before the referral is made for professional support and the second one after the support has
been delivered. This maximised engagement and helped find significantly more benefits for families in hardship. 
c) In response to increasing energy costs, we have built on the success of the Flexible Food Fund to introduce an additional support called Heat Your
Home, Manage Rising Costs to work in partnership with advice agencies in the area to provide a joined-up support service for families living in fuel
poverty. 
Page 146

Page 147

SERVICE ANNUAL PERFORMANCE REVIEW
5
d) We are engaging with the Scottish Government across several work streams aimed at supporting the sustainability of social care and reducing
social care charges for service users. These are related to the proposed introduction of the National Care Service and a review focussed on a
proposal to remove charging for non-residential care, both of which came out of the Review of Adult Social Care. 
Page 147

Page 148

FINANCIAL SERVICES – ANNUAL SCORECARD 2021/22_FINAL 
Page 148

Page 149

Page 149

Page 150

SERVICE ANNUAL PERFORMANCE REVIEW
1
NAME OF SERVICE: COMMUNITIES PLANNING AND DEVELOPMENT PERIOD: FINANCIAL YEAR 2021/22
1. DELIVERING OUR OUTCOMES
Our case studies help illustrate the positive contribution the Service has made to our communities and provides examples of good service delivery.
Corporate Outcome - Getting it Right
Business Outcome: BO116 We Engage and Work with Our Customers, Staff and Partners
Success Measure: CPD 116_01 The information provided to our community groups, individuals and partners is easy to understand
The Communities and Partnership Team send out regular information bulletins. A 2021/22 survey returned 272 respondents, of which 96% rated the
information easy to understand.
a) Information for Communities Bulletin: this bulletin developed from needs of community groups in 2020 to access information about Covid and
volunteering safely, since then, it has expanded to include consultations, training opportunities, events and signposting to funding opportunities. It is
sent fortnightly to over 300 community groups across Argyll and Bute and is well received.
b) Funding Alert: The Funding Alert is issued monthly. The funders are organised into categories of funding streams, with details of eligibility criteria with
hyperlinks to the funders webpages. Deadlines are helpfully highlighted. Over 1,500 people access funding alert each month either through direct e-
mail receipt or via the webpage. We are currently working with our partners to support their engagement with our Funding Alert and funding search
function on our webpage, as funding is a significant need arising for our community groups and third sector.
Corporate Outcome - Getting it Right
Business Outcome: BO116 We Engage and Work with Our Customers, Staff and Partners
Success Measure: CPD 116_02 All issues raised at Area Community Planning Groups are considered and responded to by the Management Committee
a) Issues raised at Area Community Planning Groups are put before the Management Committee as a matter of course. The target and benchmark of
100% of issues raised has been met.
Page 150

Page 151

SERVICE ANNUAL PERFORMANCE REVIEW
2
This year issues raised were in relation to response to Covid and also to the climate emergency. A Climate Change working group was established,
chaired by NatureScot on behalf of the CPP. The Community Planning and Development Team supported the group’s membership to develop and
produced a webpage with information on climate actions undertaken by partners and community organisations across Argyll and Bute: Community
Planning Partnership - Climate Change (argyll-bute.gov.uk) 
Corporate Outcome - People Will Live in Safer and Stronger communities
Business Outcome: BO104 Our Communities are Supported and Protected 
Success Measure: CPD 104_01 Number of capacity building sessions held with community groups 
a) The number of capacity building sessions for 2021/22 was 217, not including a further 65 support sessions undertaken as part of the Supporting
Communities Fund support to groups and organisations. There is a slight reduction on previous years due to unforeseen sickness absence impacting
Community Development staffing. Capacity sessions, consist of support and advice based on needs arising for groups such as Community Led Action
Plans, help to form links with partner organisations, matters arising from Covid response work in communities. Organisations supported included
Crossroads Caring for Carers (B&C) Tiree Community Council, Dochas Centre and Kirkmichael Community Development Group. 
Corporate Outcome - People Will Live in Safer and Stronger Communities
Business Outcome: BO104 Our Communities are Supported and Protected 
Success Measure: CPD104_02-Percentage of groups who say their effectiveness has increased as a result of capacity building the team 
a) 100%
Groups responding to this annual review positively highlighted successful interaction with the Community Development Team. The community groups
had a focus in 2021/22 of delivering Covid impact support to their communities and engaged with the Council’s Community Development Team for
support and advice. Support included regular meetings, access to the Council’s wellbeing service through Health Assured to support resiliency of
volunteers and funding advice. 
Our work to create the right conditions for community groups to be supported, and to empower community groups within their communities and in
particular in response to Covid was recognised as an example of Best Practice within Audit Scotland’s Community Empowerment: Covid
report: Support for local networking: Garelochhead Station Trust's experience during Covid — Communities Channel Scotland (communityscot.org.uk) 
Page 151

Page 152

SERVICE ANNUAL PERFORMANCE REVIEW
3
b) Training for Community Organisations
The Community Development Team have sourced and delivered a range of training courses in response to identified needs within communities across
Argyll and Bute:
• The Community Development Team worked in partnership with the Third Sector Interface in May 2021 to deliver an ‘Introduction to Evaluation’
online training course to give community organisations tools and techniques to help explain the difference their work makes which is essential for
reporting on and applying for funding.
• In August 2021, the Community Development Team facilitated an online training session run in partnership with the Council’s Procurement
Service to help community and third sector organisations learn about how to bid for public sector contracts. This interactive session offered hints
and tips on the tender process, outlined the regulations and gave details of where to look for Council contracts.
• A face to face ‘Equality and Diversity’ training course was successfully delivered for Trustees of Garelochhead Station Trust in March 2022. In
addition we provided access to online ‘Equality and Diversity’ training module on the Council’s website.
• The Community Development Team delivered training on ‘Community Asset Transfer’ in partnership with COSS (Community Ownership Support
Service) in October 2021 covering the full transfer of ownership, the leasing of licensing and other uses of publicly-owned assets including assets
owned by local authorities and public bodies.
Corporate Outcome - People Will Live in Safer and Stronger Communities
Business Outcome: BO104 Our Communities are Supported and Protected
Success Measure: CPD104_03-Percentage of groups whose users say they have an increase in confidence or wellbeing
a) 100%
Responses from groups positively highlighted successful interaction with the Community Development Team. These groups had a focus in 2021/22 of
delivering Covid impact support to their communities and engaged with the Council’s Community Development Team for support and advice.
b) Case Studies: the positive contribution made to our communities and good service delivery in the form of Case Studies.
Scotland’s Census 2022
The Community Development Team has supported staff from National Records for Scotland (NRS) to reach key population groups who have been
identified as requiring additional support to complete the Census. This has included those on low incomes, people with disabilities, Gaelic speakers and
veterans.
Page 152

Page 153

SERVICE ANNUAL PERFORMANCE REVIEW
4
The team worked in partnership with Live Argyll and Argyll and Bute Third Sector Interface (TSI) to organise and host an Argyll and Bute specific session
for community organisations interested in finding out how to support their service users and wider communities. During the final weeks of the
extended census data collection period, NRS identified low return rates on Coll and Tiree. 
Community Development Officer for OLI, worked with the NRS Community Engagement and Enumerator teams and community leaders on the islands
to identify occupied properties and holiday rentals or second homes, and to identify the best ways to reach these groups. Community groups rallied to
raise local awareness of the census and ensure the needs of the island populations are represented as fully as possible. 
Ongoing engagement with Covid response groups  
During 2021/22, the Community Development Team continued to co-ordinate monthly meetings of the Covid Community Response Groups. These
meetings brought together groups who supported the emergency response to the Covid pandemic in their communities, and who have been active in
recovery. Members swapped experiences (whether of tough times or heartening successes), networked and shared practice, and the Community
Development Team were able to provide support and updates, and respond to requests for information from the Council and Community Planning
Partnership. For example, the team was able to offer group members’ staff or volunteers access to the Council’s ‘My Healthy Advantage’ app, which
offers access to counselling and wellbeing services. An evaluation of the group showed that members had found it very valuable, reporting that
support from the Community Development Team had increased the effectiveness of their organisations and that they in turn had seen an increase in
confidence and wellbeing of their service users. 
During the emergence of the Omicron variant, groups reported difficulty in finding accurate information on the dates and locations of vaccination
clinics. The team rapidly checked and circulated the up to date data, meaning that group members could help more vulnerable members of the
community to attend clinics. 
On response to concerns about how to re-start community activities safely, Community Development officers also collated and shared information on
free training opportunities on a range of relevant topics. 
Our work to create the right conditions for community groups to be supported, and to empower community groups within their communities and in
particular in response to Covid was recognised as an example of Best Practice within Audit Scotland’s Community Empowerment: Covid
report: Support for local networking: Garelochhead Station Trust's experience during Covid — Communities Channel Scotland (communityscot.org.uk) 
Micro-Grants to aid Post-Covid Recovery
The Community Planning and Development Team, on behalf of the council, developed and ran a micro-grant fund to meet needs arising post in the
summer of 2021. 63 Village Halls and community organisations were awarded up to £500 to aid recovery of their facilities or organisations activities
after the Covid pandemic. Applications underwent a robust assessment to confirm eligibility and fit with Covid recovery criteria. Applicants offered an
award demonstrated how their project will help communities to recover from the impacts of Covid. 
Page 153

Page 154

SERVICE ANNUAL PERFORMANCE REVIEW
5
Support for community engagement with Community Planning Partnership Climate Change group
The Community Development Team supported increased engagement with the CPP’s Climate Change working group from community groups and
Development Trusts. These participants are helping to shape the group’s engagement plans and sharing good practice from community-led climate
action across the region. The team also helped identify regional leads for the four Area Community Planning Groups (ACPG) and encouraged
community organisations to share their projects and progress at the ACPGs and through the Climate Change signposting page. 
2. SIGNIFICANT CHALLENGES 
Our case studies help illustrate the positive contribution the Service has made to our communities and provides examples of good service delivery. 
Corporate Outcome - People Will Live in Safer and Stronger Communities
Business Outcome: BO104 Our Communities are Supported and Protected 
Success Measure: CPD 104_01 Number of capacity building sessions held with community groups 
a) There was limited staff resource available due to significant long term absences with 50% of the Community Development Team and the induction of
new members of staff within the overall team took time to embed. Support to community organisations has continued during this time, with resources
being dedicated to support the Covid response and the delivery of targeted projects including the Micro Grants Fund for village halls and community
organisations. Elements of this targeted support have not been reflected within this quantitative measure. The delivery of capacity building support to
develop the skills and confidence of communities across Argyll and Bute, continues to be a priority for the team.   
• In conjunction with Community Learning and Development Partners, the Community Development Team are undertaking a training needs
analysis with community groups. Working in partnership enables the service to meet any fluctuations in staffing due to unforeseen absence and
associated impacts on community organisations. 
3. CONSULTATION AND ENGAGEMENT - WE ASKED, YOU SAID, WE DID…. 
Our case studies help illustrate the positive contribution the Service has made to our communities and provides examples of good service delivery. 
a) In 2021, we ran a Community Gaelic Research Survey to understand Scottish Gaelic needs and requirements across Argyll and Bute from people with
no knowledge of Gaelic as well as for fluent speakers. Under the National Gaelic Plan, there should be more opportunities for communities and
networks of Gaelic speakers of all kinds to use Gaelic and increased use of the language in community activities and services and the survey, together
with the Argyll Gaelic Gathering, held in 2022 supported that aspiration.
Page 154

Page 155

SERVICE ANNUAL PERFORMANCE REVIEW
6
The Community Gaelic Research Survey had 1,300 respondents. The responses helped frame the priorities for a programme of work to be led by the
Gaelic Development Officer working in partnership with communities and partners. This includes: 
• Support for the development of community hubs where Gaelic can be shared 
• Need for the provision of information and raising awareness of resources available to help learners 
Full details of the survey response can be found on the council ‘You said, We Did’ page. 
b) The Argyll Gaelic Gathering consisted of three events and also an art project. Adults and young people across Argyll and Bute
and Scotland were involved.  The Argyll Gaelic Gathering was supported with funding from Bòrd na Gàidhlig. The Gathering is
a commitment by Argyll and Bute Council as part of their Gaelic Language Plan and aims to be delivered every two years. The
organisation of the Gathering was led by the Council’s Gaelic Development Worker (a post jointly funded by the Council and
Bòrd na Gàidhlig) and was the product of a collaborative working group which included Argyll and Bute Council, Comunn na Gàidhlig, CHARTS,
Fèisean nan Gàidheal, Furan Gaelic Centre, Helensburgh Gaelic Group and Ionad Chaluim Chille Ìle. 
Page 155

Page 156

SERVICE ANNUAL PERFORMANCE REVIEW
7
c) Community Planning and Development Information Survey - Our team supports community organisations and community planning partners. In doing
this we send information through regular e-bulletins (Community Development, Funding, Community Planning, Gaelic) and we provide information on
queries about Community Empowerment and Community Development (Assets, Participation Requests). We also provide information on general
funding and training opportunities, and on how to take things forward in community and partnership projects such as developing action plans and
engaging to develop these. We surveyed the recipients of our various bulletins to ensure that the information we provide is easily understandable we
and received 272 responses. 96% of respondents agreed that the information provided by the team is easily understandable. 
d) The Community Development Team, Live Argyll and Argyll Third Sector Interface created a training needs survey for community organisations. The
survey will help us to understand what training groups need to deliver the best possible support and services to communities across Argyll and Bute.
Additional insights on the needs of Gaelic language speakers and of social enterprises were provided by colleagues within the Communities and
Partnerships team. The survey is due to go live on the 10th June 2022 and the results will be used to shape our training programme. 
Page 156

Page 157

COMMUNITY PLANNING & DEVELOPMENT – ANNUAL SCORECARD 2021/22_FINAL 
Page 157

Page 158

Page 158

Page 159

SERVICE ANNUAL PERFORMANCE REVIEW
1
NAME OF SERVICE: LEGAL & REGULATORY SUPPORT PERIOD: FINANCIAL YEAR 2021/22
1. DELIVERING OUR OUTCOMES 
Our case studies help illustrate the positive contribution the Service has made to our communities and provides examples of good service delivery. 
Corporate Outcome - People Live Active Healthier And Independent Lives
Business Outcome BO102: We Provide Support, Prevention And Opportunities To Help People Make Better Lifestyle Choices 
Success Measure: LRS102_01-Advice and assistance from Welfare Rights is provided to Clients to ensure they maximise their income. 
a) We worked with service partners to deliver the redesigned advice service to cope with demand from vulnerable and non-vulnerable clients. Advice
and assistance from Welfare Rights is provided to Clients to ensure they maximise their income. We achieved 99.2% of targets despite difficult
delivery. 
Corporate Outcome - People Will Live In Safer And Stronger Communities
Business Outcome BO104: Our Communities Are Protected And Supported 
a) The Trading Standards Team initially maintained a reactive presence, which, as restrictions allowed moved to a proactive planned approach. This
despite Covid impacts allowed the Team to deal with a high proportion of all premises identified as high risk. 
b) Developed the Community Safety Partnership Strategy 2021-2023 which underpins the Argyll and Bute Outcome Improvement Plan and sets out
strategic priorities in relation to:
• We live in a safe and positive community
• We encourage safer road and water use
• Our natural and built environment is protected
• Our communities are supported and included 
It also identifies how key partners including  the Council, Police Scotland, Scottish Fire and Rescue Service, HM Coastguard, Health & Social Care
Partnership (HSCP), Third Sector Interface (TSI) and local groups will bring together resources to ensure that Argyll and Bute is a safer place to live,
work and visit. 
Page 159

Page 160

SERVICE ANNUAL PERFORMANCE REVIEW
2
Corporate Outcome - Our Economy Is Diverse And Thriving
Business Outcome BO110: We support businesses, employment and development opportunities 
a) The Procurement, Commercial and Contract Management Team provided a strong lead to ensure we continued the percentage of Council spend that
is under a contract or service level agreement while also maintaining the percentage of all Small Medium Enterprises that win council contracts. We
also worked to improve the delivery of contract management on all high risk contracts. 
We effectively planned and coordinated the release of tenders to avoid overwhelming the market, in particular the local market – by issuing invitations
to tender where the regulations allowed. For 2021/22, we awarded 151 contracts and of these 119 were Quick Quotes (ITQ’s). 
Our procurement processes were simplified and streamlined, ensuring that documentation was as straightforward as possible and engaged with local
Economic Development colleagues and other collaborative stakeholders, to support emerging priorities that will support the economic recovery within
Argyll and Bute. 
The percentage of total bids by and contracts awarded to local and SME suppliers is monitored monthly, however, not all requirements can be fulfilled
by the local supply market. To gain a better understanding of performance, the number of tenders bid for and subsequently won by local suppliers is
also monitored and detailed below. 
2021/22 - Total
No. of Tenders
2021/22 - Total
receiving local bids
2021/22 - Total won
by local bidders
2021/22
% Success Rate
151 51 40 78.4% 
The level of local spend was monitored in 2021/22, and the overall percentage with our local suppliers was 29.9%. 
The team recognises the strategic importance of maximising the economic benefits from directing Council spend to local businesses in terms of
benefiting the local economy. Whilst it would not be acceptable to give preference to local businesses during any particular procurement, efforts are
made to ensure that local businesses are upskilled so as to have the greatest chance of being successful in winning Council and other public sector
business. 
Argyll and Bute Council took part in the Meet the Buyer: Live Virtual Event on 8th June 2021. 
Page 160

Page 161

SERVICE ANNUAL PERFORMANCE REVIEW
3
b) Civic & Liquor Licensing- we put in place arrangements for continuing to deliver the civic and liquor licensing functions including the holding of virtual
Board meetings and a system for the fast tracking of occasional applications for the licensing of outdoor areas. The tri-annual review and renewal of
Civic licensing fees took place during 2021/22 and revised arrangements were put in place to facilitate this. 
c) As part of the continuing easing of lockdown measures, agreements were put in place to enable businesses to utilise public spaces identified by the
Council 
Corporate Outcome - Getting it right
Business Outcome BO115: We Are Efficient And Cost Effective 
a) Delivered 1 local by-election during 2021/22 , a Scottish Parliamentary Election  and worked to delivering the Local Government Election in May 2022
all while continuing to meet the electoral performance standards as set by the Electoral Commission. New processes, risk assessments and procedures
were devised and implemented to meet Covid-19 responsibilities while delivering a successful outcome. 
b) Increased Elected Member Transactions through paperless processes e.g. improved iPad functionality, arrangements for on-line surgeries and on-line
expenses. These arrangements and technological developments facilitated the move to virtual ways of working throughout the year and supported
the continued functioning of committees and Elected Member decision making and operating processes throughout the year which placed a heavy
reliance on harnessing technology and new ways of working. 
c) Development and Delivery of on-line/ virtual programme of seminars and training events to support Elected Member Development, Elected Member
Induction and Election Administration and Delivery. 
d) Supported key Council services to improve process and response times to Elected Members' enquiries through Casebook, the electronic case
management system used by Elected Members to record and manage constituent enquiries. 
e) Review of the Charitable Trusts and Bequests and Trust Funds to simplify and update processes where possible and ensure ongoing compliance with
charity regulations and the original terms of the bequests. The review took cognisance of the fact that a large number of the charitable funds
managed in trust by Area Committees were established many years ago, and as a consequence of changes in society over time the intended
beneficiaries of the bequests are no longer easily identified. 
f) Provided a strong Governance presence which allows the Council to continue to meet target response times where possible for Freedom of
information requests, subject Access Requests and complaints resolved at Stage 1. All of which have been impacted by Covid and high volumes of
requests.
Page 161

Page 162

SERVICE ANNUAL PERFORMANCE REVIEW
4
g) The review and improvement programme of Pecos, which aids the user experience, increase PECOS usage, improves control arrangement,
governance and contracted spend. 
Corporate Outcome - Getting it right
Business Outcome BO116: We Engage And Work With Our Customers, Staff And Partners 
a) Continue to lead the Council’s Tactical Group and provided a co-ordinated response across Legal & Regulatory Support Teams who lead on Health &
Safety and the implementation of Council Wide suite of emergency and resilience plans throughout 2021/22 presence which allows the Council to
continue to meet its ongoing obligations. 
b) Extended the Customer Service Excellence Award to include all aspects of the Legal and Regulatory Support service. Accreditation was achieved with a
number of additional criteria being upgraded to compliance plus. Achievement of this nationally recognised external accreditation demonstrates our
commitment to positive and constructive relations ships with customers and partner and how we use this to drive continuous improvement in our
services. 
c) The Governance Team extended the provision of governance and committee support to the Integrated Joint Board and the meeting reports and
minutes for key strategic committees are all hosted on ModGov. In addition arrangements were put in place to support virtual meetings and
undertake recorded sessions which are also posted on ModGov. 
2. SIGNIFICANT CHALLENGES 
The significant challenges faced by the Service during 2021/22. These challenges either created specific pressures on the Success Measures or impacted
on delivery. Specific additional activity or mitigating actions were carried out to reduce the negative impact on service delivery. 
Corporate Outcome - Our Economy Is Diverse And Thriving
Business Outcome BO110: We support businesses, employment and development opportunities 
a) Additional requirement at short notice to administer 3 separate Taxi Support Fund tranches in addition to business as usual. Required new forms,
procedures and appeals process with around 250 plus applications dealt with. All processed and paid within the deadline. 
Page 162

Page 163

SERVICE ANNUAL PERFORMANCE REVIEW
5
Corporate Outcome - Getting it right 
Business Outcome BO115: We Are Efficient And Cost Effective 
a) Delivered 1 local by-election during 2021/22 and Scottish Parliamentary election while continuing to meet the electoral performance standards as set
by the Electoral Commission. New processes and procedures were devised and implemented to meet Covid-19 responsibilities while delivering a
successful outcome. This was completed while the Election Team were also putting arrangements in place for the Local Government Election in 5th
May 2022. A significant volume of works was undertaken in relation to the planning arrangements. 
Business Outcome BO116: We Engage And Work With Our Customers, Staff And Partners 
b) Review and redevelop the Elected Member Induction Programme ahead of the 2022 local government elections. The Elected Member induction
programme underwent a review based on feedback arising from the previous local government elections and this provided the basis for the
development of a virtual programme to support election of three new Councillors during 2021/22.   
3. CONSULTATION AND ENGAGEMENT - WE ASKED, YOU SAID, WE DID…. 
The following are all the consultations and resulting actions that the Service has carried out during this period. 
a) A review of Taxi Fares was conducted during 2021/22. In terms of Section 17 of the Civic Government (Scotland) Act 1982, the Local Authority requires
to fix maximum fares and other charges in connection with the hire of taxis operating in their area and to review the scales for taxi fares and other
charges on a regular basis. The review process commenced in summer 2021 and as a result it was proposed that there would be increases to the
existing scales. This was advertised with responses invited within a month. Adverts were placed in local newspapers with a deadline given for any
responses. After review of the responses the Head of Legal & Regulatory Supports and the Chair of the Planning, Protective Services and Licensing
Committee (PPSL) agreed subsequent increases to the current fares. 
b) Procurement, Commercial and Contract Management Team conduct regular Customer and Supplier Surveys. The feedback from our Customers on
previous surveys was very positive in areas such as obtaining advice and assistance, awareness of contracts available and goods or services accurately
corresponded to requirements. The feedback from our Suppliers was also positive with an increase in supplier satisfaction in knowing where to find
contract opportunities, clearly defined performance measures, attending regular meetings to ensure effective contract delivery and happy with the way
the Council engages with their business over the term of the contract. 
c) Procurement, Commercial and Contract Management Team carried out wide consultation on the Council’s Procurement Strategy – received wide
ranging responses and addressed each one in reporting to Council on refreshed Strategy.
Page 163

Page 164

LEGAL AND REGULATORY SUPPORT – ANNUAL SCORECARD 2021/22_FINAL 
Page 164

Page 165

Page 165

Page 166

SERVICE ANNUAL PERFORMANCE REVIEW
1
NAME OF SERVICE: COMMERCIAL SERVICES PERIOD: FINANCIAL YEAR 2021/22
1. DELIVERING OUR OUTCOMES 
Our case studies help illustrate the positive contribution the Service has made to our communities and provides examples of good service delivery. 
Corporate Outcome -  Children and Young People have the Best Possible Start
Business Outcome 107 The Support And Lifestyle Needs Of Our Children, Young People And Their Families Are Met 
CATERING AND CLEANING
a) The Council continues to offer fresh, healthy and sustainable school lunches, and hold the Soil Association Scotland’s Bronze Food for Life Served Here
award.  This award is a widely respected and independently assessed scheme, supported by the Scottish Government, which helps local authorities to
source food from the local area for school meals so that children benefit from freshly prepared, sustainable meals. It recognises Councils that serve
food made from fresh ingredients, free from genetically modified ingredients and undesirable additives, using free-range eggs and high-welfare meat.
The catering service serves 4,300 Food for Life accredited meals a day. 
b) The Catering Department has implemented a new menu compliant with the requirements of the Food and Drink in Schools (Scotland) Regulations
2020. This means our pupils are receiving a nutritious meal, lower in sugar, a decrease in red meat and an increase in fruit and vegetables. There are
also changes to the permitted products in secondary schools and a change to how the secondary meals are analysed. 
c) The Catering department had a surveillance audit for continued accreditation for ISO 9001:2015. 
d) The Catering and Cleaning Innovations projection was successfully completed, which led to a redesign of the service that will be fit for future purpose
and will assist in the services continuing to provide a service for our children and young people. 
e) In January 2022, P4 and P5 children were included in the provision of Universal Free School Meals. This has been successfully implemented
throughout Argyll and Bute. 
f) Successful implementation of the new allergen legislation resulting in full compliance by the implementation date in all our secondary schools. 
g) The Beach Café in Oban has opened and is being run by Argyll and Bute Council Catering Department. This has been a hugely successful operation,
and has proved popular with visitors and locals, and is used extensively by users of the centre as well as special catering provision.
Page 166

Page 167

SERVICE ANNUAL PERFORMANCE REVIEW
2
h) Positive recovery of events as we begin to emerge from the pandemic. 
i) Argyll and Bute Council were awarded the Footprint Foodservice award for the Community Food Project. 
Corporate Outcome -  We Have An Infrastructure That Supports Sustainable Growth
Business Outcome BO113:Our infrastructure is safe and fit for the future 
ESTATES
a) During 2021/22 the Estates Section met its targets for marketing properties identified as ‘held for sale’ and delivered significant capital receipts
disposing of properties to meet the longer term capital targets. This not only generates income to be reinvested in the wider priorities of the Council
but also reduces ongoing running costs, maintenance and insurance risk in addition to providing accommodation for new enterprises to develop. A
good example of this was the disposal of Blairvadach House and grounds which generated a capital receipt and also transferred a listed building to a
developer which reduced the Council’s risk exposure and will bring the property back into beneficial use. 
MAJOR PROJECTS
Success Measure: COM113_03-The Council's Capital Plan is delivered within the approved budget tolerances as at the investment decision stage
In the Reporting Year, 5 projects, from the Council’s Capital Plan, were being delivered by the Programme and Project Management Services Team within
Commercial Services i.e. 
b) Oban Transit Berthing Facility (OTBF) – Practical Completion Achieved and Facility Operational. Closing out remaining defect, following appointment of
specialist marine engineering consultant to review, assess and report on root cause and mitigation. 
c) Rothesay Pavilion Adaptive Restoration (RPN) – Original Contractor entered into Administration. Services of replacement Tier 1 Contractor secured,
Robertson Construction Central West, for the delivery of Phase 1 Pre-Construction Activities, and Phase 2 Construction Works to Completion. Due to
emerging cost/budget issues, the Phase 2 Construction Works are currently on hold whilst additional capital funding support is sought. 
d) Helensburgh Waterfront Development (HWD) – Main Contract Awarded to Heron Bros Ltd on 14 July 2020 with works commencing on site in August
2020. Section 1 works i.e. the construction of coastal flood defences, car parking and public realm, and new Leisure Building are well advanced, and on
programme to be handed over to the Council on 29 July 2022. 
e) Kilmory Business Park – a joint public (Argyll and Bute Council) and private sector (M&K MacLeod Ltd) development to provide the area with a new
facility is being progressed, supported by funding contributions from the Scottish Government Regeneration Capital Grant Fund; Argyll and Bute
Council; Highlands and Islands Enterprise; and M&K MacLeod Ltd. The Planning application has been submitted and validated, the funding from the
Page 167

Page 168

SERVICE ANNUAL PERFORMANCE REVIEW
3
Scottish Government has been secured, and we are in the process of finalising the various legal agreements (funding, construction,
land/property/access rights etc.) to facilitate the delivery of the works later in FY22/23. 
f) Lochgilphead Front Green – providing project management support and mentoring to the Projects and Renewables team within Development and
Economic Growth for the delivery of significant public realm improvements in Lochgilphead, with the project programmed to achieve Practical
Completion in FQ1 FY22/23. 
Success Measure: COM113_04-The Council's Capital Plan is delivered on time.
In the reporting year, 4 projects from the Council’s Capital Plan were being delivered by the Programme and Project Management Services Team within
Commercial Services
a) Oban Transit Berthing Facility (OTBF) – Closing out remaining defects: 
b) Oban Maritime Visitor Facility (OMVF) – Project being formally closed out, following on from which some additional works will be implemented. 
c) Rothesay Pavilion Adaptive Restoration (RPN): Main Contractor in Administration, with works 70% Complete. Replacement Contractor to be procured
for works required to achieve Practical Completion. 
• Original Forecast Completion – FQ2 FY19/20
• Revised Forecast Completion – TBC subject to positive resolution of funding shortfall 
d) Helensburgh Waterfront Development (HWD) – Main Contract Awarded on 14 July 2020 to Heron Bros Ltd, construction works have commenced on
site. 
• Original Forecast Completion – FQ4 FY22/23
• SECTION 1 Practical Completion – 29 July 2022
• SECTION 2 Practical Completion – FQ4 FY22/23 
PROPERTY SERVICES
a) The Property Maintenance Team’s continued partnership approach to term maintenance contracts has resulted in locally based contractors being
awarded contracts resulting in significant benefit to the Argyll and Bute economy. In addition, training and employment opportunities are being
provided to Argyll and Bute residents through the community benefit requirements of these contracts.
b) Working in conjunction with colleagues in the Education Service, the Council’s Property Design Team substantially delivered projects in Early Years
settings to allow the provision of 1140 hours of pre-school education.
Page 168

Page 169

SERVICE ANNUAL PERFORMANCE REVIEW
4
c) Combinations of the Energy & Building Services Team and the Property Maintenance Team have again successfully delivered the emergency, planned
and statutory maintenance programmes associated with the £2Million+ annual/revenue Central Repairs Account. For 2021/22, additional challenges
have included the additional costs associated with COVID and earlier processing dates to meet the end of financial year deadlines resulting from the
proposed upgrading of Council financial systems. 
Business Outcome BO114 Our Communities are Cleaner and Greener 
PROPERTY SERVICES
a) The Energy & Building Services Team utilised the Non-Domestic Energy Efficiency Framework (NDEEF) to invest £1.2m in carbon friendly energy
solutions (LED Lighting, Air Source Heat Pumps, Solar PV panels) which will provide the Council with a simple payback on the investment of 10 years.
As a result the Council’s carbon footprint will reduce by circa 460 Tonnes/annum. Most ‘mini-projects’ have been delivered with a modest balance
scheduled to be implemented at the start of the 22/23 delivery year. 
b) The Energy & Building Services Team accessed £60K grant funding to support internal Fleet colleagues with the installation of Electric Vehicle charging
points – 14 no. individual charging points across 5 properties. 
c) The property Maintenance Team continued to take opportunities to improve insulation and replace single glazing with double glazing while carrying
out normal building maintenance to our properties. 
Corporate Outcome -  Getting It Right
Business Outcome BO115 We are Efficient and Cost Effective 
PROPERTY SERVICES
a) Agreement was reached to review the staffing and team structure within Property Services. This had a particular focus on the reorganisation of the
Major Projects Team and Property Services given the opportunities for synergies and enhanced programme management whilst refocusing towards
contract management, client management and climate change priorities. These structural changes will be implemented/delivered during 2022/23. 
b) The Energy & Building Services Team commenced a large-scale project to review water, waste water and drainage charges for the whole Council.
While at an early stage, a Council target to save £25K-£50K per annum was achieved during 2021/22 and further savings opportunities are being
explored for delivery in 2022/23. 
Page 169

Page 170

SERVICE ANNUAL PERFORMANCE REVIEW
5
Business Outcome BO116: We engage and work with our customers, staff and partners 
ESTATES
a) An innovative project which was completed in 2021/22 was the lease of a derelict site at Lochside Street, Oban. The ground had been vacant for some
time and there were title concerns but after extended marketing a lease was agreed for a garden centre with a rooftop bar based on a temporary
building structure. This generated a good income, redeveloped a derelict but central site and also generated new employment opportunities. 
b) Marketing a former schoolhouse on Islay during the pandemic was always going to be a challenge. However using a combination of marketing on
Rightmove, video tours and staff visiting the island the school house was sold in 2022 with a local family acquiring it which also supports the
challenges of housing in our island communities. 
c) Part of the team’s role under the One Council approach was to take on more valuation work internally which makes savings for the council and also
builds the knowledge and experience of the team. During 2021/22 the team completed the annual update of the asset valuation programme which is
regulated by the terms and conditions of engagement with Finance as the client department. Team members were able to attend CIPFA and RICS
courses as part of this learning experience and also utilise an online training facility (asset valuation circle) to develop wider knowledge which will
benefit the individuals involved. 
d) Working with partners is a key component of an estates management service but it can also be challenging as the Council has a number of
interactions with partners and not all are to deliver good news. However over the last 12 months the team have worked well with large landowners
such as Argyll Estates and Luss Estates along with developing key relationships with ACHA and Fyne Homes who deliver social housing in the area. This
has led to long running issues around car park leases and civic amenity sites being resolved along with progressing development schemes with the
housing associations. 
Page 170

Page 171

SERVICE ANNUAL PERFORMANCE REVIEW
6
2. SIGNIFICANT CHALLENGES 
The significant challenges faced by the Service during 2021/22. These challenges either created specific pressures on the Success Measures or impacted
on delivery. Specific additional activity or mitigating actions were carried out to reduce the negative impact on service delivery. 
Corporate Outcome -  Children and Young People have the Best Possible Start
Business Outcome 107 The Support And Lifestyle Needs Of Our Children, Young People And Their Families Are Met 
CATERING AND CLEANING
a) Delivering an enhanced cleaning service has been challenging as prior to the pandemic the cleaning standards in schools and offices was already at the
lower end of acceptable. Limited logistics funding has enabled some enhanced cleaning to be delivered in schools however this is not sustainable in
the long term without committed funding and permanently increased hours. 
b) The Soil Association have implemented a new inspection portal which has meant the reaccreditation process is extremely challenging. 
c) The service has continued to prepare for the roll out of UFSMs for P6 and P7s, breakfast and holiday provision. This has been challenging due to lack
of clarity on budgets, information and resources to continue with the implementation. 
d) In addition to price increases there have been on-going supply issues in the food industry. 
e) Continued recovery of commercial catering and events income. The increase in events is promising but will need continued support and nurturing to
continue and increase. 
Corporate Outcome -  We Have An Infrastructure That Supports Sustainable Growth
Business Outcome BO113: Our infrastructure is safe and fit for the future 
ESTATES
a) During the last 12 months the wider economy has suffered and this has in turn put pressure on local and national businesses. It is anticipated that this
will remain a challenge for some time and this will have an ongoing impact on the ability of businesses to meet ongoing commitments such as rental
payments. In addition the pressure on finances has led to less investment and developers looking to progress with projects which has impacted on
capital receipts and the progress of development schemes. There is also pressure on the supply of building materials which is causing construction
cost price inflation which may make development schemes unaffordable. Finally there has been a noticeable increase in the workload of the team in
Page 171

Page 172

SERVICE ANNUAL PERFORMANCE REVIEW
7
the last 2 years which can be challenging for a small team to meet and lead to a firefighting approach which increases the risk of incorrect decision
making. 
b) The Council’s insurers identified in 2021 that a revaluation of the full property portfolio is required. This is a significant task and relies on property
data which has been highlighted as being of variable quality across the asset base. It will be a challenge for the team to complete this along with other
tasks. 
c) A number of large property projects have been moving forward at the same time and while this is positive from the wider council viewpoint it will be
increasingly challenging for a small team to progress this in addition to the day to day workload. Additional external support has been procured but
the time taken to complete the procurement and management of the consultants also requires to be factored into the demand on the team. 
MAJOR PROJECTS
Success Measure: COM113_03-The Council's Capital Plan is delivered within the approved budget tolerances as at the investment decision stage.
Success Measure: COM113_04-The Council's Capital Plan is delivered on time. 
a) Rothesay Pavilion Adaptive Restoration - Following the insolvency of the Main Contractor (CBC) in Mar-20 the Council procured the services of
Robertson Construction Central West, through the SCAPE Procure National Construction Framework, to deliver: (1) Pre-Construction Activities i.e.
develop a Schedule of Activities and Tendered Price to take the project through to Practical Completion. 
b) In December 2021 the Council was advised that the cost of completing the works would significantly exceed the available and approved budget, by
some £12million. At that point the Council took the decision to ‘pause’ the works at the end of the Pre-Construction Activities, and to lobby for
additional capital funding support from external organisations, including the Scottish and United Kingdom Governments. 
c) The Project Team, including the Design Team, Cost Consultants and the Contractor, are developing proposals for interim works, which might be
delivered within the remaining available budget, and which would help protect the significant investment already made in the building. 
d) Project Affordability – given the unprecedented impact of recent global events e.g. COVID-19 Pandemic, the UK withdrawal from the EU, and most
recently the Russian invasion of Ukraine, national and global economies have been adversely affected, and the cost of construction materials,
equipment, plant, and resources has risen significantly. This raises significant issues for the on-going delivery of capital works projects at a time when
not only is the Council’s capital budget being reduced, but also its ability to finance the cost of borrowing, using revenue funding, is also being
reduced. 
Page 172

Page 173

SERVICE ANNUAL PERFORMANCE REVIEW
8
PROPERTY SERVICES
a) Irrespective of whether works/contracts are funded from revenue or capital, we continue to have access to only a limited number of contractors. This
creates difficulty in delivery of programmes of work especially where availability of sites is restricted such as school holiday periods. Additionally, our
contractors are suffering from the nationwide skills shortage and again this causes difficulty in being able to deliver a service within the desired
timescales. 
b) The annual revenue Central Repairs Account continues to be under pressure across all services to conduct essential maintenance. There are however
particular ‘hotspots’ ( Depots, HSCP, Airfields) where funding allocations are below that required to limit H&S risks and maintain business continuity. 
Business Outcome BO114 Our Communities are Cleaner and Greener 
PROPERTY SERVICES
a) The significant progress that has been made in reducing the Council’s property-related carbon footprint has primarily been as a result of dealing with
the more straightforward and cost effective solutions. The journey to net-zero requires the delivery of more complicated solutions which are more
costly and there is challenge in balancing the need for carbon reduction at a time when budgets/resources are reducing. 
b) Many areas within Argyll and Bute are off gas grid and the electrical grid has limitations in terms of capacity/constraints. These issues continue to
impact on the Council (and the wider community) in terms of resilience and delivering renewables solutions, EV charging etc. 
Corporate Outcome -  Getting it Right
Business Outcome BO115 We are Efficient and Cost Effective 
PROPERTY SERVICES
a) Elements of the Property Team had longer-term staffing shortages during the year. This made service delivery particularly challenging but it is
anticipated that this will be resolved during 2022/23. 
3. CONSULTATION AND ENGAGEMENT - WE ASKED, YOU SAID, WE DID…. 
Please list all consultations and resulting actions that the Service has carried out during this period. 
NO CONSULTATIONS TOOK PLACE.
Page 173

Page 174

COMMERCIAL SERVICES – ANNUAL SCORECARD 2021/22_FINAL 
Page 174

Page 175

Page 175

Page 176

SERVICE ANNUAL PERFORMANCE REVIEW
1
NAME OF SERVICE: CUSTOMER SUPPORT SERVICES PERIOD: FINANCIAL YEAR 2021/22
1. DELIVERING OUR OUTCOMES 
Our case studies help illustrate the positive contribution the Service has made to our communities and provides examples of good service delivery. 
Corporate Outcome - People Live Active, Healthier and Independent Lives
Business Outcome BO101 We Ensure Information and Support is Available for Everyone 
a). Success Measure: CSS101_01-Improve the accuracy rate for registration for our births, deaths and marriages by the council’s Registration Service.
The National Records of Scotland independently audit all council registration services for accuracy of registration and look back on the previous full
year, hence in 21/22 they examined the registrations for 20/21. Our target was to have to have no more than 2.1% error rate, but the actual audited
rate was 3.5%. However it must be remembered that the target was set before the Covid pandemic struck. That pandemic resulted in massive
operational changes for registrars; including the remote recording of Death Registrations, a torrent of new Covid related registration regulations to
absorb and excess death workloads that put the service under tremendous strain; including at times the introduction of 7 day working and post
lockdown surges in pent up wedding demand. Hence a total of only 80 errors across 2,315 registration events was regarded by the independent
Examiner as an excellent performance. The Registrars speedily adopted both remote digital Death Registration service and virtual Citizenship
Ceremonies (Brexit led to a spike in demand for them too). They also adapted the Tell Us Once death notification service for 1,124 customers, put in
place a new appointment based face to face service for Birth Registrations, used the Marriage Website, social media and a digital Wedding Diary to
inform and accommodate those seeking weddings and civil partnerships. In the most recent customer Satisfaction Survey in FQ3/4 of 2021/22 97% of
127 respondents were Very Satisfied with the registration service provided. 
In addition many of the Registrars (who also staff our Customer Service Points) were also deployed to undertake the pro-active support calls to those
customers required to self-isolate by Covid regulations. Between October 2020 and end of April 2022 6,128 self-isolating customers were contacted
and offered domestic or financial support. Of these 2,925 submitted claims for the £500 Self Isolation Support Grant. A number were referred to
Community Groups for domestic or transport assistance. In November and December 2021 the Customer Service Points/Registration resource also
provided emergency assistance to NHS Highland to help them cope with customer contacts regarding the Vaccine Booster Programme. In a four week
period they handled 2,738 enquiries for the Vaccination Hub and helped NHS Highland meet its target of having over 80% of over 18 year olds offered
a vaccination by the end of December. 
Page 176

Page 177

SERVICE ANNUAL PERFORMANCE REVIEW
2
b). Success Measure: CSS101_02-Increase public use of corporate social media sites on three categories of information: council news, community
success and general use.
Our success measure was to increase the percentage of corporate social media sites. During the period we responded to 700+ media enquiries, issued
220+ media releases, 50 weekly new round up subscription emails, 50+ staff Newsflash emails, posted up to three times a day across various social
media channels. 
We increased our social media following to: Facebook = 17,000+; Twitter = 15,000+; Instagram = 7,000+; Linkedin = 3,600+ 
c). Success Measure: CSS101_03 Increase the percentage of telephony enquiries received by Customer Service Centre that are dealt with at first point
of contact.  
The Contact Centre agents handled over 152,000 enquiries from customers in 2021/22 and 112,000 were by telephone. The aim of the CSC is to
resolve as many of these calls there and then either by fully providing the information or service requested, or by logging a request for service for
action by the relevant council team. This allows operational staff to focus on service delivery without being distracted by constant phone calls. The
target was to resolve 82% of phone enquires without transfer to the back offices, but it actually achieved 94.4%. 
In addition to this the council’s ongoing investment in 24/7 voice automated services continued to
deliver excellent results, with 8919 customers making automated payments (worth £1.63m) and
41,605 uses of the automated directory. The Coronavirus Helpline was also used 1501 times in
2021/22. Contact Centre technology has been deployed to the HR Team and Scottish Welfare Fund
Team to help them manage call demands effectively and in 2021/22 a new rolling program of call
quality evaluation was introduced called Agent Evaluation so that qualitative as well as
quantitative management was tracked and used for continual improvement. The whole CSC
system was upgraded to the latest “Liberty Converse” version with greatly enhanced real time
monitoring dashboards.
Corporate Outcome -  Our economy is Diverse and Thriving
Business Outcome BO112 Argyll & Bute Is Promoted To Everyone. 
a).#abplace2b campaign
Purpose -  promote the lifestyle and career opportunities on offer, to attract new residents and skills 
How? - develop and encourage public/partner use of #abplace2b on social media, develop www.abplace2b.scot to showcase the area, jobs on offer,
local businesses, lifestyle etc..
Progress - Partners and public are using #abplace2b. Our #abplace2b Instagram account is the most followed of all of Scotland’s councils. Partner use
of #abplace2b continues to grow 
Page 177

Page 178

SERVICE ANNUAL PERFORMANCE REVIEW
3
Continued to increase use of #abplace2b as a budget-free way of promoting Argyll and Bute as a great place to live and work; this is based on
promoting the great lifestyle the geography of Argyll and Bute allows for, and which sets the area apart from other locations. Members of the public
and partner agencies are increasingly using it. This will be complemented and developed by www.abplace2b.scot, which we are updating for relaunch
in 2022.
b). Community life - responsible staycation tourism
In response to community concerns as tourism opened up after Covid restrictions, we developed and promoted our ‘Have a great time. Be a great
visitor’ message and campaign, bringing together information from different organisations. The campaign received a positive public response. 
c). Connecting with Employees
Launched www.mycouncilworks.co.uk to connect the council and its employees more easily. 
Page 178

Page 179

SERVICE ANNUAL PERFORMANCE REVIEW
4
d) Connecting with our Communities - Health and wellbeing
We issued free weekly news email subscription: by adapting its content to include more Covid-health, and other topical non-council news, we
supported our communities’ wellbeing e.g. “Thank you for such regular, clear newsletters. So comforting to know we in isolation are included in outside
life!....and I trust it!” 
e)  Great place to live and work – Promoting Argyll and Bute 
f)  Oban bid for city status 
The Communications Team developed the strapline for the council’s city status bid, and evidenced public backing for
city status. Both elements formed key parts of the council’s bid.   
g)  Rural Growth Deal
The Communications Team developed the story of the deal: 
Connecting: our high value business sectors with national and international business markets; our local economic successes with national strategic
priorities.
Attracting: additional skills, training and learning opportunities; new residents, visitors and businesses.
Growing: doing more of what works; making more of our natural and built resources. 
h)  A healthy workforce and a healthy working environment 
A healthy workforce and a healthy working environment are essential to achieving higher levels of attendance and providing high quality services. The
Wellbeing Team reviewed, updated and relaunched two key procedures, The Reducing Stress in the Workplace procedure and the Supporting
Attendance procedure. 
In order to ensure that employees and managers were fully aware of the changes and the support that is available to them in managing their health,
wellbeing and attendance at work the following were delivered: 
• Promotion via newsflash and Wellbeing Wednesday
• Availability of updated procedures and supporting documents on both The Hub and My Council Works
• A programme of drop in supporting attendance webinars for employees and line managers to attend to learn more about changes to the new
procedure and ask questions. 
• A programme of drop in webinars for line managers to learn about the updated reducing stress procedure and the importance of preventative action
Page 179

Page 180

SERVICE ANNUAL PERFORMANCE REVIEW
5
• A reducing stress workshop delivered by EAP provider Health Assured
• A webinar guide for managers on accessing EAP support for themselves and those they manage
• Having a conversation about stress guidance document
• Reducing stress in the workplace eLearning currently awaiting launch
• Access to wellness action plans to support line managers and employees to discuss appropriate support for mental health conditions 
Corporate Outcome -  We Have An Infrastructure That Supports Sustainable Growth
Business Outcome BO113: Our Infrastructure Is Safe And Fit For The Future 
a). Success Measure: CSS113_02-Deliver the ICT and Digital Strategy Action Plan 
ICT and Digital Team - Our aims 
• Our networks and systems are secure, accessible and current
• ICT provides value, and enables and empowers both customers and staff to make tasks easier
• Our people have the knowledge and capabilities to use ICT effectively 
We continue to network and engage with Scottish Local Government Digital Office, Society
For Innovation Technology and Modernisation (SOCITM) and Scottish Government Digital
Team to ensure that we achieve best practice, share our experience and expertise,
maximise public sector joint working on ICT and digital and achieve the highest levels of
value for money we can through active procurement and contract management. 
b). With approximately 100 actions associated with the 2021-24 ICT and Digital Strategy Action Plan, the following are highlights but the majority of
actions are progressing satisfactorily and to target:
• We have been accredited Public Services Network (PSN) and CE+ for 2022/23 as planned.
• We have implemented MS 365, migrating all 2000 corporate mailboxes to Exchange online and migrating all H: drive content to OneDrive.
• We have implemented MS Teams and established appropriate guidance and governance for both MS Teams and a selection of MS365 Apps.
• We continue to refresh our hardware assets and keep them up to date through the capital Asset Sustainability programme as planned.  
• We have demonstrated engagement more widely with our customers through the completion of the 2021 Customer Service Questionnaire.
• We continue to improve the accessibility of our corporate network through the completion of upgrades of bandwidth capacity at both Kilmory and
GWITC (Graham Whitefield IT Centre). All existing circuit speeds increased in bandwidth (doubled at Kilmory).
Page 180

Page 181

SERVICE ANNUAL PERFORMANCE REVIEW
6
• We continue to increase the provision of services on a digital platform wherever possible. This is exemplified by the extension of the Parent Evening
Booking System to additional schools and facilitate remote parent evening via video call. Parents/ carers can select and amend an appointment to suit
their needs.
• We continue to support delivery of digital learning through the deployment of additional devices provided under the digital poverty initiative funded
by the Scottish Government. 
• An illustration of joining up our systems through more integration using available technologies is the implementation of live streaming from the
council chambers for selected committee meetings with integration to Modern.Gov and MS teams. 
• We have reviewed and continue to improve our disaster recovery and business continuity plans and technologies.
• We have worked with the Customer Engagement Team to achieve Customer Service Excellence accreditation. 
• We directed the upgrade IKEN case management system to the latest version and have upgraded the technology platform for improved performance
and compatibility.
• We have developed a replacement system to ensure the continued recording of pastoral notes records for Education following the withdrawal of the
functionality in SEEMiS (education management information system). 
c). Success Measure: CSS113_06-Maintain the average time to resolve ICT incidents 
We have operated well within our service level targets with service levels at or above previous levels and our response times were as good as previous
years. 
Corporate Outcome -  Getting It Right
Business Outcome BO115 We are Efficient and Cost Effective 
a). Success Measure: CSS115_01-Increasing percentage of self service and automated contacts through the Customer Service Centre and Website.  
The target was 62% however the percentage achieved was 73%, or 410,000 out of 563,000 customer interactions through the Contact Centre’s various
channels: 
This maintained the significant shift to digital prompted by Covid lockdown the
previous year and the ongoing provision of high quality online and automated
services that customers prefer to use for 24/7 convenience. Despite there being a
large reduction in coronavirus related enquiries and support requests compared
to 2020/21, the value of efficiencies attributable to use of online services was
maintained at £912k. 
Page 181

Page 182

SERVICE ANNUAL PERFORMANCE REVIEW
7
Significant new online developments in 2021/22 included:
• The launch of the council’s Alexa smart speaker service with its “when’s my bin day?” service, which now has 1216 subscribers who used the service
7,257 times last year.
• Roll out of a number of new satellite websites including the Staycation Site, Invest in Argyll site, over a dozen new school sites recreated using
Wordpress, Period Product access and sites for partners such as the Helensburgh Museum site.
• Implementation of a new marketing and notification system called Eloqua to refresh the Keep in the Loop service, which now has 10,489 subscribers
and the addition of new Ferry disruption alerts to that service, which issued 17,000 alerts to subscribers over the winter.
• Implementation of a next generation web chat bot called Abbot to the council website.
• In addition, the online services retained an exemplary record for accessibility of content, which is crucial not only from an equality point of view, but
also to ensure the website is as usable as possible for customers with a range of abilities. Hence in March 2022 we scored a 99% standard and ranked
as 13th best in the UK out of over 400 council websites on the independent Silktide standard. 
b). Scottish Local Government Living Wage Consolidation
Following delivery of an options appraisal for reconfiguration of the pay and grading model to accommodate the Scottish Local Government Living
Wage (SLGLW), the agreed model was delivered. This included a review of the pay and grading structure to accommodate the SLGLW and
modernisation of terms and conditions. A review, rationalisation and streamlining was carried out into allowances and expenses and a consultative
ballot by the Joint Trade Unions on the proposed method of consolidating the (SLG) Living Wage into the council’s Local Government Employee (LGE)
pay scale as well as the proposed changes to the conditions of service document 
Page 182

Page 183

SERVICE ANNUAL PERFORMANCE REVIEW
8
Business Outcome: BO117 We encourage creativity and innovation to ensure our workforce is fit for the future 
a)  Quality Conversations
Changes were made to the PRD (Performance Review & Development) process to put quality conversations at the heart of how we do our business. 
Our updated approach moved away from the prescribed PRD template and is focused on an ongoing dialogue that captures conversations between
the line manager and their staff about objectives, behaviours, skills and development and career/development aspirations.   
The change was communicated via newsflash and a guidance document was launched to help managers in finding an approach to these conversations
that works for them and their team. A series of drop in webinars were delivered for employees to gain further insight into the new approach, ask
questions and discuss with their peers.   
This approach also encouraged managers to consider how quality conversations can support wider communication at team level on agreeing
objectives and key activities and monitoring progress. 
2. SIGNIFICANT CHALLENGES 
The significant challenges faced by the Service during 2021/22. These challenges either created specific pressures on the Success Measures or impacted
on delivery. Specific additional activity or mitigating actions were carried out to reduce the negative impact on service delivery. 
Corporate Outcome -  We Have An Infrastructure That Supports Sustainable Growth
Business Outcome BO113: Our infrastructure is safe and fit for the future 
a) Cyber-attacks
2021/22 saw an unprecedented increase in the level of risk associated with cyber-attacks.  The public sector has repeatedly experienced significant
cyber-attacks which disrupted services and cost millions of pounds to remediate.  This has been a global phenomenon, and with heightened geo-
political tensions there is an increasing risk that an attack targeted at a specific sector or organisation will escape into the wider world and have serious
worldwide consequences.  The need for our ICT teams to be ever more vigilant and responsive has never been greater. Our ICT teams have responded
admirably to each and every emerging threat but the additional day to day challenges inevitably impact their workload in order to maintain the very
high levels of service being delivered. 
Page 183

Page 184

SERVICE ANNUAL PERFORMANCE REVIEW
9
b) MicroSoft365
The accelerated implementation of MS365 to enable Teams as part of the Pandemic response resulted in the need to reallocate team resource from
other priorities. This enabled a fast and effective transition with minimum disruption to the business and the creation of a secure operational
environment in the Cloud.
Corporate Outcome - Getting it Right
Business Outcome BO115 We are Efficient and Cost Effective
a) Recruitment
• Our Communication Team is a small team and has been reduced by as much as 40% for a prolonged period due to difficulties in recruiting to two
different vacant posts. We redesigned the role and hours of one post, which is now filled; and we are in the process of redesigning the second post.
• Our HROD Team has experienced recruitment challenges in terms of being able to attract suitable candidates. Sickness absence in some areas of the
team as well as increased demand due to Covid have led to issues in the team’s ability to meet service delivery expectations in some areas such as
learning and development, departmental support and Systems development. Some projects experienced delayed in implementation. Actions taken to
address the situation include a review of job descriptions, improved wording of adverts and increased profile on social media as well as support for
team members on sickness absence.
3. CONSULTATION AND ENGAGEMENT - WE ASKED, YOU SAID, WE DID….
Please list all consultations and resulting actions that the Service has carried out during this period.
a) Whilst there has been no formal customer consultation from during this period, the Communication Team has received positive feedback from the
campaigns we have run and communications that we have sent out.
b). Customer Satisfaction and Insight Surveys
The Customer Engagement Team operates a number of automated customer satisfaction and customer insight surveys that allow customers to provide
input on the quality of customer service and elements that could be improved or enhanced. Surveys include:
• A pop up satisfaction/feedback survey on the website
• An automated quality survey put on acknowledgements after online forms have been completed
• A “what else would you like to see on the website” survey after website interactions
• An automated customer satisfaction survey offered to callers on certain lines in to the Customer Service Centre
• A quality of service survey offered to every person who registered a birth, death or marriage with our Registration Service
• A complaints handling procedure satisfaction survey.
Page 184

Page 185

SERVICE ANNUAL PERFORMANCE REVIEW
10 
The feedback on these are used as part of continual improvements and are reported e.g. in the Quarterly Web Report 
c) SOCITM customer satisfaction 
The SOCITM (Society For Innovation Technology and Modernisation) customer satisfaction survey takes place 2 yearly and is due to be reported on in
2022. Recent comments from customers received by the team include:
• The excellent preparedness by the team ensured that we were able to make a full and rapid transition to remote working from the beginning of Covid.
• I have found ICT to be helpful, responsive and flexible even when being asked for support outside their area of responsibility
• I have been incredibly impressed by our ICT team's ability to react and implement a first class service during very trying times.
• ICT service has improved immensely over the past few years. One example is that you can get through immediately to an engineer, thus the problem
can be rectified immediately. 
Page 185

Page 186

SERVICE ANNUAL PERFORMANCE REVIEW
11 
d) Wellbeing Survey 
A survey was issued to all employees to understand their views on current wellbeing provision and how they viewed their own current health and
wellbeing. From this the following actions were identified:
• We will be including suggested topics in forthcoming Wellbeing Wednesday issues
• We will be encouraging you to share with us your experiences
• We will be developing tools for line managers to assist them to support you.
• We will be considering corporate initiatives in relation to commitment for wellbeing 
d) Corporate Training Needs 
A survey was issued to establish the types of training that employees felt would be most beneficial to them and how they would prefer to receive training
in the future.  The results were used to establish a corporate training offering for 2022 and beyond that is suited to the new ways of working and future
service delivery and meets the needs of employees. 
e) Hybrid Working Survey
The feedback from this survey was used by the Hybrid Working Short Life Working Group alongside benchmarking information gathered from other
councils and approaches taken by other employers in their development of a hybrid working policy.  It was determined that one prescriptive approach to
hybrid working is unlikely to suit everyone as individual circumstances are important to consider and that these can change over time. The policy provides
detail and a set of principles which will support a change in the way we work, while not being prescriptive about what that approach will look like. 
Page 186

Page 187

CUSTOMER SUPPORT SERVICES – ANNUAL SCORECARD 2021/22_FINAL 
Page 187

Page 188

Page 188

Page 189

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE                 
11 AUGUST 2022 
AMENDMENT TO PENSION DISCRETIONS POLICY - SHARED COST AVCs 
1.0 EXECUTIVE SUMMARY 
1.1 On 11 April the Strategic Management Team (SMT) approved the
implementation of Shared Cost Additional Voluntary Contributions (AVCs) via
AVC Wise.  This will enhance our financial wellbeing offering to eligible
employees further developing the employee benefit scheme which was
successfully launched in 2021. 
1.2 The Council already offers Additional Voluntary Contributions (AVCs) via
Prudential.  AVCs are a way to save for retirement.  They provide an opportunity
to supplement your Local Government Pension Scheme (LGPS) and build up an
additional retirement fund.  Employees can take this as a tax free lump sum or it
can be helped to use them to retire early by increasing their monthly pension
income. 
1.3 The LGPS and HMRC regulations provide the necessary authority for
employers to introduce a Shared Cost AVC scheme. The advantages of
implementing this new Shared Cost AVC arrangement over the current
standard AVC scheme is that in addition to the Income Tax relief that staff
currently receive, they and the employer will also receive National Insurance
contribution relief. 
1.4 The Shared Cost Additional Voluntary Contributions are paid to the Council’s
current AVC provider – Prudential, so for employees who already pay AVCs that
will not change. 
1.5 As part of the implementation of Shared Cost Additional Voluntary Contributions,
SMT approved the proposal to include a new discretion in the Council's LGPS
Discretionary Pension Policy Statement to permit Local Government Pension
Scheme (LGPS) members to participate in a Shared Cost AVC scheme. 
1.6 Regulation 17(1) & Definition of SCAVC in RSch 1 of the Council’s existing
Pension Discretion Policy requires to be updated. 
1.7 It is recommended that the Policy and Resources Committee approve the
amendment to the Council’s Pensions Discretion Policy to allow employees to
Page 189 Agenda Item 7

Page 190

access this financial benefit if they so choose.  
Page 190

Page 191

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE                                          
11 AUGUST 2022 
AMENDMENT TO PENSION DISCRETIONS POLICY - SHARED COST AVCs 
2.0 INTRODUCTION 
2.1 On 11 April SMT approved the implementation of Shared Cost Additional
Voluntary Contributions (AVCs) via AVC Wise.  This will enhance our financial
wellbeing offering to eligible employees further developing the employee benefit
scheme which was successfully launched in 2021. 
2.2 As part of the implementation of Shared Cost Additional Voluntary Contributions
SMT approved the proposal to include a new discretion in the Council's LGPS
Discretionary Pension Policy Statement to permit Local Government Pension
Scheme (LGPS) members to participate in a Shared Cost AVC scheme. 
2.3 To enable the SCAVC’s to be implemented Regulation 17(1) & Definition of
SCAVC in RSch 1 of the Council’s existing Pension Discretion Policy requires
to be updated. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee approve the
amendment to the Council’s Pensions Discretion Policy to allow employees to
access this financial benefit if they so choose.
4.0 DETAIL 
4.1 The Council already offers Additional Voluntary Contributions (AVCs) via
Prudential.  AVCs are a way to save for retirement.  They provide an opportunity
to supplement your Local Government Pension Scheme (LGPS) and build up an
additional retirement fund.  Employee can take this as a tax free lump sum or it
can be helped to use them to retire early by increasing their monthly pension
income.
4.2  The advantages of implementing this new Shared Cost AVC arrangement over
the current standard AVC scheme is that in addition to the Income Tax relief
that staff currently receive, they and their employer will also receive National
Insurance contribution relief.   Employees who contribute to a Shared Cost AVC
scheme will pay lower National Insurance contributions (NICs) and this saving
Page 191

Page 192

will automatically be passed into the AVC. For most staff this will result in a
saving of 13.25%.
4.3  The employees currently paying AVCs will be asked if they wish to transfer to
the new scheme via a number of presentations which explain the benefits of a
Salary Sacrifice scheme.  
4.4  If 90% those employees who currently have AVCs transfer to the salary
sacrifice Shared Cost AVC arrangement the Council can expect to achieve
immediate annual savings of around £24,538 immediately.  It is expected
(based on previous business experience) that the expected take up could be
increased to an estimated 7.5% of LGPS members utilising the scheme saving
£300 per month then the Council will make projected gross NI savings of
£129,206 - the Council’s net savings would be £88,547. The AVC Wise fee
would amount to £40,659 on that basis. Argyll & Bute Council can also claim
back the VAT.
4.5  How the scheme works in practice is that the employee accepts a contractual
reduction in remuneration (a salary sacrifice), equivalent to the amount they
would like to pay into the scheme, and the employer pays this amount into the
Shared Cost AVC plan on their behalf. To meet the 'shared cost' arrangement
the employee is then required to pay a nominal £1 each month into the Shared
Cost AVC through a payslip deduction.
4.6  Any contractual earnings such as overtime, pay increases, contractual
allowances, occupational maternity pay, occupational sickness pay, and
redundancy will continue to be calculated on the notional salary before the
salary sacrifice is applied.  
4.7  The LGPS and HMRC regulations provide the necessary authority for
employers to introduce a Shared Cost AVC scheme. As part of the
implementation of Shared Cost Additional Voluntary Contributions, SMT
approved the proposal to include a new discretion in the Council's LGPS
Discretionary Pension Policy Statement to permit Local Government Pension
Scheme (LGPS) members to participate in a Shared Cost AVC scheme.
4.8  The existing discretion reads as follows:
Regulation Discretion Argyll & Bute Council policy on the
exercise of this discretion
R17 (1)
and R15
(1) (d)
Whether, and
in what
circumstances
to contribute
to a shared
cost AVC
scheme
Argyll & Bute Council will not exercise this
discretion but will keep under review   
Page 192

Page 193

4.9  The discretion would be amended to:
Regulation Discretion Argyll & Bute Council policy on the
exercise of this discretion
R17 (1) and
R15 (1) (d)
Whether, how
much and
what
circumstances
to contribute to
a Shared Cost
AVC scheme 
Argyll & Bute Council will pay shared cost
AVCs where an employee has elected to
pay AVCs by salary sacrifice.  The amount
of these employer Shared Cost AVCs will
not exceed the amount of salary sacrificed
by the employee.  This discretion is subject
to the employee meeting the conditions for
acceptance into the salary sacrifice Shared
Cost AVC scheme and may be withdrawn
or changed at any time. 
5.0 CONCLUSION
5.1 Shared cost AVCs have benefits for both employees and employers.  This
improves the financial wellbeing benefits available to the employee in a way that
allows them to save for the future and allows the Council to make savings.
5.2  In order to implement the scheme a change is needed to the Council’s Pensions
Discretion Policy. 
6.0 IMPLICATIONS
6.1  Policy – The council’s discretionary pensions policy will need to be amended
and published to provide the authority to enable staff to pay into Shared Cost
AVCs as one of our discretions.  The scheme documentation will need to
state that the Shared Cost AVCs are to be treated as a pensionable
emolument in accordance with the LGPS regulations (Regulation 20(1)(b) of
the 2013 Regulations), to ensure that a member’s main scheme benefits are
not reduced.
6.2  Financial – This will lead to employer NIC savings. Payroll assistance will be
required and support around implementation.
6.3  Legal – There are a number of legal issues that require action prior to the
implementation of a Shared Cost AVC scheme. The Shared Cost AVC
scheme information pack and frequently asked questions must explain the
scheme in sufficient depth to enable staff to understand the implications of
becoming a Shared Cost AVC member.  The employee will be required to
sign a salary sacrifice agreement to vary the contract of employment to accept
the contractual reduction in remuneration. The Shared Cost AVC scheme will
need to be approved by HMRC.
6.4  HR – Will lead on implementation and maintain the ongoing relationship with
the suppliers involved.
6.5.1  Fairer Scotland Duty – These benefits will provide an opportunity to address
inequalities of outcome caused by socio-economic disadvantage.
Page 193

Page 194

6.5.2 Equalities – Protected Characteristics – benefits will be made available to all
permanent employees who meet the appropriate qualifying conditions.
6.5.3 Socio Economic Duty – Strategic decision making in relation to enhancing and
modernising employee benefits has taken into account how these changes
and additions will benefit those who experience socio-economic
disadvantage.  
6.5.4 Islands – The provision of financial products and educational tools to
employees on Islands will seek to ensure that they have access to a wide
range of benefits via online provision.
6.6  Climate Change – The utilisation of online mediums for employee benefits has
assisted in the reduction of postage and travel to access products and
services.
6.7 Risk – Risks SS AVC’s are manageable and the key will be to ensure
employees are aware of their responsibilities through clear, effective and
ongoing communication.  To safeguard any future compliance issues, the
Shared Cost AVC scheme will require HMRC approval prior to launch. Other
councils have achieved this requirement and this work is included in the
specification to be delivered by the successful external provider. In addition,
the council will be required to carry out some routine checks to ensure that
any applications comply with the National Living Wage/National Minimum
Wage rules and again this has been included in the requirements to ensure
that the checks can be made within the external provider platform.   
6.8 Customer Service – This will serve our internal customers, our employees
across all services and grades well. They will have the opportunity to access a
wide range of financial benefits at preferential rates or in the case of those
able to purchase AVC’s with a saving in national insurance. 
Kirsty Flanagan
Executive Director with responsibility for Customer Support Services
19 July 2022
For further information contact: 
Jane Fowler, Head of Customer Support Services 
Jane.Fowler@argyll-bute.gov.uk 
Seona Laird, HR Team Leader 
Seona.Laird@argyll-bute.gov.uk 
Page 194

Page 195

ARGYLL AND BUTE COUNCIL  POLICY & RESOURCES COMMITTEE 
DEVELOPMENT AND 
ECONOMIC GROWTH  
11th AUGUST 2022 
ARGYLL AND BUTE UK SHARED PROSPERITY FUND INVESTMENT PLAN   
1.0 HEADLINES 
1.1 The purpose of this paper is for members of the committee to approve the Argyll and
Bute UK Shared Prosperity Fund (UKSPF) Investment Plan (see Appendix A), to
deliver the council’s allocation of just under £4.5m (see Table 1) to be delivered over
3 years. 
1.2 As the UKSPF is a successor to the previous EU structural funds, it is viewed as a
central pillar of the UK Government’s Levelling Up agenda. The overarching aim of
the UKSPF is to build pride in place and increase life chances across the UK. 
1.3 The project / programme activities outlined in the Argyll and Bute UKSPF Investment
Plan are all aligned to three key investment priorities communities and place;
supporting local business; and people and skills, where each priority has
predefined interventions, outputs and outcomes. In addition to core UKSPF monies,
the investment plan includes a focus on ring-fenced ‘Multiply’ funding to support the
delivery of an area-based adult numeracy programme. 
1.4 The Argyll and Bute Council UKSPF allocations to support delivery over three
financial years, specifically the final five months of 2022-23 and the next two financial
years, 2023-24 and 2024-25, until the end of March 2025 are outlined in Table 1. In
particular, it should be noted that all allocations are required to be spent in-year. 
1.5 At present the UK Government is looking for a fairly light touch indicative investment
plan. Subject to a clear rationale, there will be scope to amend investment plans if other
local / regional opportunities arise during this funding period; although the process to do
this has not been identified. 
1.6 A key requirement for the UKSPF investment plan is to take account of the wider
funding landscape, existing programmes, other new funding opportunities and
complementary interventions from other national or local schemes. Local authorities
are responsible for the development and preparation of UKSPF investment plans, in
conjunction with local partners/stakeholders. The investment plan needs to be approved
by the local authority (Council Leader, CEO and Section 95 Officer), with endorsement
of support from local the MP, prior to its submission. The UK Government will provide
the final approval to unlock the funding allocations. 
Page 195 Agenda Item 8

Page 196

1.7 At the Argyll and Bute Council meeting on 30th June 2022, it was agreed that the Argyll
and Bute UKSPF Investment Plan should be given final approval at the Policy and
Resources Committee on 11th August 2022. Furthermore, members agreed that senior
officers will seek the required endorsement from the local MP to support the Argyll and
Bute UKSPF Investment Plan. 
1.8 The timescale for submission of these investment plans is extremely tight; the
submission window is from 30th June to 1st August 2022, and the work required to
complete investment plans during the Scottish Local Government July recess period. 
1.9 Further to the political approval process agreed by the full council on 30th June, Argyll
and Bute Council has been granted an extension by the UK Government until the 1st
September 2022 to submit our investment plan. It is recognised that given that our
investment plan may be signed off later, allocations may arrive later than planned and
therefore may have an impact on our delivery timescales for 2022/23. On that basis,
subject to addressing any comments/amendments made by the Policy and Resource
Committee, it is hoped that the Argyll and Bute UKSPF Investment Plan will be
submitted online as soon as possible after the 11th August 2022. 
1.10 Further to a partner/stakeholder consultation event on 10th June 2022, due to an
extension being required to enable the necessary political approval, consultees were
advised to submit proposals for the entire period, but with a particular focus on those
that could practically and realistically deliver the UKSPF allocation, including that for
Multiply, for the remaining part of 2022-23. 
1.11 The initial suggested proposals from partners/stakeholders and internal colleagues for
inclusion in the investment plan was 220% over the allocation limit. In the first instance
everyone who submitted a proposal was asked to confirm the minimum viable project
cost, where costs could be scaled back and identify any interventions that could be
dropped. As costs were still higher than the allocation, officers developed eligibility
criteria with an associated scoring RAG (red, amber & green) scoring system (see
Appendix B), along with further consultation discussions/e-mail correspondence with
partners/stakeholders and internal colleagues, to populate a final plan to directly match
the in-year allocations. 
2.0 RECOMMENDATIONS 
2.1 Members are asked to: 
 Agree Argyll and Bute UKSPF Investment Plan appended to this report
(Appendix A) for submission to the UK Government, subject to addressing any
amendments/ comments from the committee members. 
 Provide regular updates to the Policy and Resources Committee on the progress
of the delivery of the Argyll and Bute UKSPF Investment Plan aligned to the
predefined outputs and outcomes. 
Page 196

Page 197

3.0 DETAIL 
3.1 On 13th April 2022 the UK Government published the full prospectus of the UKSPF, a
successor to the previous EU structural funds. The overarching aim of the UKSPF is to
build pride in place and increase life chances across the UK. This encompasses four
levelling up objectives and three investment priorities.
The levelling up objectives are:
 Boost productivity, pay, jobs and living standards by growing the private
sector, especially in those places where they are lagging;
 Spread opportunities and improve public services, especially in those places
where they are weakest;
 Restore a sense of community, local pride and belonging, especially in those
places where they have been lost; and
 Empower local leaders and communities, especially in those places lacking
local agency. 
The Investment Priorities are:
 Communities and place;
 Supporting local business; and
 People and skills. 
The interventions list can be found here and the objectives, outcomes and outputs
can be found here. 
3.2 The UK Government has published individual council allocations of both core UKSPF
funding and Multiply. While this is a predominantly revenue fund, there is a minimum
amount of capital that must be spent for each year. It is up to the local authority to
advise what is deemed as capital funding. 
3.3 A detailed summary of the Argyll and Bute allocation is outlined in Table 1 overleaf,
complete with the proposed 4% administration fee for overall fund delivery, minimum
capital spend per year and the percentages of the allocation by year with the largest
allocation for core UKSPF in 2024-25. It is a concern that the allocation for Multiply is
30.2% for 2022-23 which does not take into account the shorter timescale for
delivery. 
3.4 Each lead local authority will receive its annual allocation in advance, complete with
£20k of initial capacity funding. In 2022-23, funding will be paid once the local
investment plan has been signed off by the UK Government (October 2022 onwards).
For 2023-24 and 2024-25 payment will be at the start of the financial year. 
3.5 Match funding is not a prerequisite and will not form part of the investment plan
assessment criteria. However, lead local authorities are strongly encouraged to
consider match funding from the private, public and third sectors and leverage
options when selecting communities and place and supporting local business
interventions to fund in order to maximise the value for money and impact of the
UKSPF. 
Page 197

Page 198

Table 1: Argyll and Bute UKSPF Allocation 
2022/23 2023/24 2024/25 Total allocation
In-year allocations (%) Core UKSPF 12.1% 24.3% 63.6% 
Core UKSPF £451,343 £902,686 £2,365,038 £3,719,067
In-year allocations (%) Multiply 30.2% 34.9% 34.9% 
*Multiply £234,698 £270,806 £270,806 £776,310
Total £686,041 £1,173,492 £2,365,844 £4,495,377     
4% of total: admin fee - fund
delivery
£27,442 £46,940 £105,434 £179,815     
In-year allocations (%) capital 10.4% 12.5% 17.9% 
Capital: minimum spend of total
Core UKSPF only, not Multiply
£46,940 £112,836 £423,342 £583,117     
Available allocation (exc. admin) 2022/23 2023/24 2024/25 Total allocation
Core UKSPF £433,289 £866,579 £2,270,436 £3,570,304
Multiply £225,310 £259,974 £259,974 £745,258
* Multiply is an adult numeracy programme, which will support people with no or low-level maths skills get back
into work The scheme will offer free personal tutoring, digital training, and flexible courses to improve adults’
confidence and numeracy skills. Full details on Multiply can be found here
N.B. Figures subject to rounding 
3.6 As the initial proposals for inclusion in the Argyll and Bute UKSPF Investment Plan
were 220% greater than the allocation, everyone who submitted a proposal was
asked to confirm the minimum viable project cost, where costs could be scaled back
and identify any interventions that could be dropped. As costs were still higher than
the allocation further to this exercise, officers developed eligibility criteria and an
associated RAG scoring system (see Appendix B). For instance, consideration was
given to the wider policy and funding landscape, existing activities and programmes,
other new funding opportunities and other complementary interventions from other
national or local schemes. This was followed up by discussions / e-mail
correspondence with all internal colleagues, partners and stakeholders to enable the
preparation of the final plan for approval, where proposals directly match the in-year
allocations, see Appendix C, UKSPF Expenditure Profile spreadsheet. The
expenditure spreadsheet and the UKSPF Indicative Deliverables spreadsheet,
summarised in Tables D1 and D2 in Appendix D, must be submitted, along with the
Argyll and Bute Investment Plan (Appendix A) using the UK Government’s online
portal. 
3.7 The indicative investment plan assessment period for the UK Government is July to
September 2022, with anticipated investment plan approvals and first payments to
local authorities from October 2022. Further details on the UKSPF and the associated
process to develop and prepare investment plans are outlined in the full prospectus.  
Page 198

Page 199

4.0 CONCLUSION 
4.1 The purpose of this paper is for members of the committee to approve the Argyll and
Bute UK Shared Prosperity Fund (UKSPF) Investment Plan, Appendix A. 
4.2 The Argyll and Bute UKSPF Investment Plan has been developed and prepared in
conjunction with internal council colleagues, local partners/stakeholders, with
endorsement of support sought from our MP (to be confirmed verbally at the meeting on
the 11th August). 
4.3 Due to the tight timescales associated with the submission of the investment plan
(even with the granted one month extension), agreement and support is sought on the
recommendations in this paper. 
5.0 IMPLICATIONS 
5.1  Policy - This project aligns with the proposals set the UKSPF full prospectus 
5.2  Financial - Argyll and Bute Council has been given an allocation of just under £4.5m
from the UKSPF to be spent by the end of March 2025. This is accompanied by £20k
of capacity funding to assist in the development and preparation of the investment
plan and the ability to use up to 4% of the allocation per annum to fund administration
support for the overall delivery of the Argyll and Bute UKSPF Investment Plan. 
5.3  Legal - All appropriate legal implications will be taken into consideration. 
5.4  HR - Given the revenue nature of this fund, staffing requirements can be built in
under activity to deliver the predefined interventions, outputs and outcomes. A staff
resource will also be required to administer, monitor and evaluate the overall delivery
of the Argyll and Bute UKSPF Investment Plan. 
5.5  Fairer Scotland Duty - The Fairer Scotland Duty, Part 1 of the Equality Act 2010,
came into force in April 2018. The duty places a legal responsibility on particular
public bodies in Scotland, such as Argyll and Bute Council, to pay due regard to
(actively consider) how they can reduce inequalities of outcome, caused by socio-
economic disadvantage, when making strategic decisions and how this has been
implemented. 
5.5.1  Equalities - All activities will comply with all Equal Opportunities/Fairer Scotland Duty
policies and obligations.
5.5.2  Socio-economic Duty - All project activities will comply with the council’s socio-
economic duty.
5.5.3  Islands - Interventions under the UKSPF will be delivered across the Argyll and Bute
area, including island communities. 
5.6  Climate Change – There are a number of net zero and climate resilience
interventions across all the UKSPF investment priorities.  
Page 199

Page 200

5.7  Risk – If Argyll and Bute UKSPF Investment Plan is not approved for submission in
the associated tight timescale, this could jeopardise the ability to submit a compliant
investment plan to unlock the area’s UKSPF allocation. 
5.8  Customer Service – None.   
Kirsty Flanagan, Executive Director with responsibility for Economic Growth 
Councillor Robin Currie: Policy Lead for Economy and Rural Growth
11th August 2022 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Ishabel Bremner, Economic Growth Manager 
Ishabel.Bremner@argyll-bute.gov.uk 
Appendixes:- 
Appendix A: Argyll and Bute UKSPF Investment Plan and a summary of projects and
programmes 
Appendix B: Project Scoring Assessment Framework 
Appendix C: Expenditure Spreadsheet 
Appendix D: Indicative Outputs and Impacts – as of 2nd August 2022 
Page 200

Page 201

UK Shared Prosperity Fund 
Argyll and Bute Investment Plan, August 2022 
Your location
To be eligible for funding, you will need to be applying on behalf of a lead authority in one of
the delivery geographies.
Select the lead authority
For Scotland and Wales only: Who else is this investment plan being submitted on behalf
of? Select all that apply  
Page 201

Page 202

Your details
Name: Kirsty Flanagan
Email address: kirsty.flanagan@argyll-bute.gov.uk 
Phone number: 01546 604268
Organisation name: Argyll and Bute Council 
Local challenges and opportunities
In this section, we will ask you:
 If you've identified any challenges or opportunities, you intend to support
 Which of the UKSPF investment priorities these fall under
ARE THERE ANY LOCAL CHALLENGES YOU FACE WHICH FALL UNDER THE
COMMUNITIES AND PLACE INVESTMENT PRIORITY?
(If yes) Describe these challenges, give evidence where possible
Tourism
Due to the pandemic and enforced business closure, the Argyll and Bute Council area saw
significant decreases in the tourism and hospitality sector: 
• -57.6% Visitor days 
• -65.4% Visitor numbers 
• -54.8% Direct Expenditure 
• -34% Direct employment 
(Source: Argyll and Bute Scottish Tourism Economic Activity Monitor (STEAM) data 2019, comparison with
Q1&Q2 2021). 
Recovery has faced obstacles and delays with changing restrictions and regulations over 2020 and
2021. There have been inevitable business casualties. Targeted and sustained marketing efforts
will be necessary to raise the profile of the destination’s offers effectively; and attract visitors who
will respect as well as enjoy Argyll and Bute. 
Childcare
In specific areas of Argyll and Bute, it is a challenge to deliver childcare pre-school, post school and
during holidays to allow parents/carers the opportunity to work or offer greater flexibility in working
hours. 
Community Development
Our communities, and partners, through the Community Planning Partnership, have identified the
challenge of addressing the Climate Emergency in Argyll and Bute. They have been working
together to seek ways to address this. 
Community organisations have expressed a desire to come together to share best practice, ideas
and increase capacity and resilience through learning from one another. These needs have been
raised through thematic focused discussions (i.e. climate change, COVID recovery and resilience)
and also in communities with protected characteristics such as Gaelic speaking communities. This
is a challenge within Argyll and Bute due to the large land mass and remote rural and island
communities, which impacts travel and ability to meet. There is a need to support a digital solution
and there is complexity with this due to the capacity building needs around skills / lack of digital
infrastructure within community facilities. 
Fuel Poverty and the Cost of Living Crises 
The current challenges with regard to fuel poverty and the cost of living are particularly prevalent in
the large and sparsely populated rural area of Argyll and Bute. In the area there is a predominance
of low paid, temporary and seasonal contracts, in industries of agriculture, forestry and tourism.
During the pandemic tourism was particularly hard hit. The Scottish Government’s income
Page 202

Page 203

distribution statistics 2018 show that Argyll and Bute is in the bottom third of local authority areas
with the lowest gross weekly incomes, whilst the cost of transport and distribution of food means
that the cost of living is also much higher in rural areas of Scotland like Argyll and Bute. A Scottish
Government (2021) report estimates that the minimum cost of living in remote rural Scotland is
between 15% and 30% higher than urban parts of the UK. 
In addition being remote and rural, fuel poverty is a significant issue facing Argyll and Bute, the
most recent Scottish House Condition Survey 2020 suggesting that 43% of residents are living in
fuel poverty, 4% more than the national average. The Atlantic Islands House Condition Survey
suggests that in some areas 63% of local residents are in fuel poverty. 
Fuel Poverty is defined as “if (a person), to heat their home to a satisfactory standard, needs to
spend more than 10% of their household income on fuel then they are in fuel poverty”. 
The Scottish Index of Multiple Deprivation (SIMD) is a relative measure of deprivation across 6,976
small areas (called data zones). The SIMD ranks all data zones in Scotland according to levels of
deprivation relative to one another. 
13 of Argyll and Bute’s 125 data zones fall within the 15% most deprived data zones in Scotland. 
These data zones are all located in our biggest towns of Rothesay, Dunoon, Campbeltown,
Helensburgh and Oban. 
Patterns of deprivation vary by domain, there are seven domains in total including income,
employment and geographic access to services. A particular contrast can be seen between levels
of access deprivation, which affects most of rural Argyll and Bute and levels of deprivation across
other SIMD domains, wherein the towns are seen to exhibit higher levels of multiple deprivation
relating to income and employment. 
Although Argyll and Bute has few areas with high levels of multiple deprivation, other instances of
deprivation will occur outside these areas, especially in rural areas where populations are more
heterogeneous, meaning small pockets of poverty sit outwith the main towns very close to areas of
affluence. 
This all forms part of a major challenge for Argyll and Bute to minimise poverty by maximising
incomes providing well paid jobs and cheap affordable housing amongst other key targets. 
Places
The majority of our population live in towns or smaller settlements and therefore our places and any
resulting improvement to them is critical to the quality of life and health and wellbeing of our
communities who live and work in them as well as providing more attractive places for those visiting
or looking to invest. There is a real need in many of our towns and settlements for funding to
support ‘small-scale projects’: projects enacted on the local level of a town, settlement or a
neighbourhood and aimed at enhancing the quality of the place and quality of life, the health and
wellbeing of our communities including the social and cultural life of local residents as well as
improving the place for those living, working, visiting and investing.
ARE THERE ANY LOCAL OPPORTUNITIES UNDER THE COMMUNITIES AND PLACE
INVESTMENT PRIORITY THAT YOU INTEND TO SUPPORT?
(If yes) Describe these opportunities, give evidence where possible
Tourism
The tourism industry is resilient and there is an appetite to build back better in terms of both the
visitor economy and quality of visitor offering; and to focus on an improved tourism product
increasingly responsive to communities and sensitive to the outstanding environment. 
Not all tourism and hospitality businesses have suffered. Some have made innovative and long-
lasting changes to their business model. Some have seen an increase in visitors by ensuring their
visitor offer is aligned to market needs; safety assurance, flexibility of booking conditions,
improvements enabled through pandemic grants. Scottish Tourism Economic Activity Monitor
(STEAM) data for Argyll and Bute in the first half of 2021 suggests significant build-back with
economic impact more than doubling from £41.95m in 2020 to £94.83m in 2021 - a remarkable
recovery rate of 126.1%. (Source: ABC STEAM DATA 2019 comparison to Q1&2 2021).
Page 203

Page 204

Predictions at the time of the 2022 Visitor Economy Recovery and Growth Strategy development
suggest a 3-6 year worldwide full tourism recovery period. Sustained marketing and product
development is necessary to underpin confidence in travel and position Argyll and Bute as a safe,
sustainable and enjoyable destination. There is both appetite and need to take the pent-up travel
demand and encourage locals and visitors to enjoy Argyll and Bute and improve direct spend in the
area. There are opportunities to support businesses to create new visitor facing products and to
use marketing activity to encourage visitors to come to the destination, stay longer and spend
money in the local economies. 
Community Development
To build on the momentum of time and dedication given by community groups and partner
organisations to come together and address concerns with the climate emergency. To date, and
over a period of more than a year, the group has worked together and produced a business case
for feasibility study on climate change. They have also produced a webpage (Community Planning
Partnership - Climate Change (argyll-bute.gov.uk)) with the work to date in the area; which enabled
the identification of gaps and need for a study. There is then opportunity to support community
organisations to deliver via funding to community groups to help bring community cohesion, and
increase volunteering on climate change matters through community projects and activity. 
The council has trialled innovative ways in bringing groups together online during the pandemic and
there is opportunity to expand this to develop ‘hubs’; both online to provide opportunity to mitigate
the remote rural challenges, and within communities by developing community assets fit for
purpose. Further to this the Community Learning and Development Partnership (CLD) has ‘digital’
as a priority in its plan to improve digital skills and access across Argyll and Bute; partners are
actively looking at how best they can approach this jointly – this includes the Third Sector. 
The Shaping Places for Wellbeing project in Dunoon is one of six projects in Scotland seeking to
address health inequalities. There is an opportunity for funding to support the needs being
identified in this project; including the development of built assets to improve community cohesion,
volunteering and place. 
If we were able to support the Food Bank in Dunoon to undertake the feasibility studies and carbon
reduction works required for a community asset then it would make a significant difference to the
community work and volunteers of those associated with the group. The group is developing
projects on energy reduction advice, clothing re-use and other support that has multiple societal
and environmental impacts. There is opportunity to support them to flourish within a local asset. 
Fuel Poverty and the Cost of Living Crises
We have the opportunity to provide grant funding to deal with the immediate fuel and food crisis.
We can encourage vulnerable householders to engage with the professional advice services
provided by local third sector organisations to ensure a better long term outcome for them. This
includes the provision of financial inclusion skills and education services and a knowledge of where
to go for help and assistance in the future, including support to ensure that claimant income from
work and/or benefits is maximised, they are also to be given money and debt advice if required and
budgeting skills training at the same time. 
Referrals can be made for Fuel Debt Relief and Advice, Behavioural Change designed to minimise
future fuel bills, the provision of energy efficient white goods and fuel vouchers and top-up
payments can also be provided to claimants all in ensure a much better longer term outlook for
vulnerable householders helping them to self-serve in future should they be faced with similar
challenges again.   
Creating a school uniform bank can support families with school uniform costs whilst at the same
time increasing recycling. Doing this via a social enterprise can help educate schools and pupils in
social enterprise and entrepreneurship, building jobs and retaining skills of young people in our
area. 
Places
Small-scale projects have the potential to play a role in renewing and reviving our towns and
smaller settlements making them more attractive, vibrant and living places.  
Page 204

Page 205

ARE THERE ANY LOCAL CHALLENGES YOU FACE WHICH FALL UNDER THE
SUPPORTING LOCAL BUSINESS INVESTMENT PRIORITY?
(If yes) Describe these challenges, give evidence where possible
Argyll and Bute was ranked most vulnerable in the Vulnerability Index 2020 in terms of economic
shock resulting from the COVID pandemic. Rural areas are less resilient than urban areas.
Evidence 
The following points have been taken in the main from evidence collected for the Highlands and
Islands area, which includes Argyll and Bute. 
 There is an increase in Highlands and Islands businesses reporting that they are operating
below pre-COVID levels. A recent survey reports that in the last six months only 34% have
increased turnover, 16% increased employment and 11% increased exports. 43% are striving
for growth, 57% are focusing on resilience and 55% on enhancing productivity. The most
important factors in helping to achieve these plans were given as adapting products/services
50%, upskilling staff 46%, investing in technology 43%, collaborating 43% and external advice
and support 42%. Evidence
 Productivity in the Highlands and Islands area is lower, at £46,500 compared to £50,200 for
Scotland. Mid-term and longer-term forecast average annual growth in Gross Value Added
(GVA) is below Scotland and the UK. Evidence 
 The biggest barrier to innovation for businesses in the Highlands and Islands was it not being a
priority (39%) but 38% report costs as the barrier. Evidence 
 Cost pressures on small businesses have hit a 7 year high.  Credit availability and affordability
indices have worsened and will further worsen as interest rates rise. Evidence 
 Almost half of businesses in Scotland report having experienced difficulties recruiting
employees. Evidence Skills assessments for the Highlands and Islands area suggest that many
of the key sectors for Argyll and Bute are reporting skills gaps – Tourism 16%, Health and
social care 17%, Construction 13%, Food & Drink 13%, Agriculture Forestry & Fishing 13%
Evidence
 Tourism and Hospitality businesses owners face unprecedented challenges during the
recovery of the sector from the pandemic. In addition to attracting back visitors, most
businesses are facing staffing challenges, rising costs and increasing regulation. Inflation is
running at a high of 11%, interest rates are climbing, and energy bills are expected to at least
double in the coming 12 months. Practical interventions which can either reduce costs and / or
support innovation will be welcomed at a time when business owners have less time to operate
strategically 
 UK tourism and hospitality vacant roles are running at an all-time high of 1.3m (Source: Scottish
Tourism Alliance). Any intervention designed to support attraction and retention will be well
received by employers across Argyll and Bute.
 Social economy delivers a range of essential services to communities with limited capacity
argyll_and_bute_se2017_census_report.pdf (argyll-bute.gov.uk)
 Majority of social enterprises and micro businesses with limited capacity for growth
argyll_and_bute_se2017_census_report.pdf (argyll-bute.gov.uk)
ARE THERE ANY LOCAL OPPORTUNITIES UNDER THE SUPPORTING LOCAL BUSINESS
INVESTMENT PRIORITY THAT YOU INTEND TO SUPPORT?
(If yes) Describe these opportunities, give evidence where possible 
Business support
We have the opportunity to enhance the business support available from the council from the point
of start-up through to growth. Scaling up existing support and introducing new activities, will provide
more support to a greater number of SMEs to assist growth and sustainability. This includes:
 A package of start-up support to help new start SMEs to establish and build sustainability
 A package of business development support to help local SMEs to grow sustainably or recover
from the pandemic and build resilience
 A package of employer support to help local SMEs recruit, train and manage staff
 A package of feasibility study support to help local SMEs develop and innovate
Page 205

Page 206

Grants and specialist advice support has been provided by the council utilising European Structural
Funds for a business growth programme which concludes in 2023. Recent follow-up of 104
supported businesses shows 74% have delivered growth since receiving support, with a combined
£8.2m increase in turnover and 109 additional FTE jobs created. There is a clear opportunity to
build on and continue this type of support for local businesses. 
Tourism support
Pre pandemic, Argyll and Bute enjoyed hundreds of large and small events across the destination
bringing not just visitor enjoyment but employment, economic improvement and served to
showcase the best of our local artists, musicians, dancers and crafters. Post pandemic, there is
visitor and participant appetite to gather again and celebrate those skills and important cultural and
heritage events. At the time of application, and the height of summer, there are circa 200 events
scheduled – a fraction of those held previously. With support, local community groups and
professional event organisers can once again schedule an events line up for 2023/24 as a key
component of the visitor growth strategy. 
Social Enterprise support
We have the opportunity to build on the longevity and proven track record of social enterprises
across our rural communities delivering vital services and building social, environmental and
economic capital for communities. Well established social economy sector with opportunities to
address local challenges and opportunities, including community led renewables, tourism,
sustainable forestry, food production, rural housing and land ownership. The last Social Enterprise
Census in 2019 provided compelling evidence of the significant contribution of social enterprises to
employability and job creation. 55% employ someone with a disability or long-term health
condition, 42% employ previously unemployed young people and 69% provide training and support
to improve employability. Social enterprises are a key solution to the employment challenge 
ARE THERE ANY LOCAL CHALLENGES YOU FACE WHICH FALL UNDER THE PEOPLE AND
SKILLS INVESTMENT PRIORITY? (In Scotland, Wales, and Northern Ireland this should also
include challenges relating to Multiply)
(If yes) Describe these challenges, give evidence where possible
Population Demographic
Future population projections suggest a reduction in total population of 7.2% from 2010 to 2035.
The decline in population experienced to date and that projected in the future presents a significant
challenge to the overall viability of the area. 
Projections up to 2035 suggest that the population is ageing, with the percentage of the population
over 65s expected to increase from 15% to 39.7%. More people living longer is a real success,
however the demographic changes do create a number of challenges, including the availability of
people to join the overall workforce in Argyll and Bute. 
Service Delivery & Resources
The workforce is shrinking, so we must do everything we can to support those within working age,
into employment or further education. Currently there is a gap in the provision of adult literacy and
numeracy support in Argyll and Bute, which is a challenge as this is a limiting factor in supporting
adults into work and further education. Due to our resources, we are currently unable to deliver
one-to-one support, which is so vital in this area of work. 
Physical Geography 
Delivery of one-to-one support sessions is a challenge due to the large, dispersed geography of
Argyll and Bute, the second largest local authority area in Scotland and has the largest number of
inhabited Islands (23 Islands). Around 17% of our population live on an island (Census 2011). The
size of the area and population dispersion require multiple facilities for service delivery to ensure
services are delivered close to users and communities. The distance between main settlements
and use of ferry services create challenges in terms of reliability, time and cost of travel. 
Infrastructure and transport issues
Rural, remote rural and island communities – thus limited access to range of employment
opportunities or training. Additional barriers relating to reputational issues with lack of anonymity in
Page 206

Page 207

a rural setting. Rural Employment - Policy | Employability in Scotland Youth unemployment in rural
areas | JRF 
Skills Shortages
The mismatch between unemployed people with limited skills, confidence and a range of barriers,
including increasing mental health issues to access skills opportunities available. – evaluation
information from SYP phase 1 
ARE THERE ANY LOCAL OPPORTUNITIES UNDER THE PEOPLE AND SKILLS INVESTMENT
PRIORITY THAT YOU INTEND TO SUPPORT? (In Scotland, Wales, and Northern Ireland this
should also include challenges relating to Multiply)
(If yes) Describe these opportunities, give evidence where possible
There are a number of local opportunities that could be capitalised on by the dissemination of UK
Shared Prosperity Fund monies across the proposed project interventions: 
 Strong Partnerships & Referrals of Learners
Regionally and locally there are strong partnerships, with Adult Learners supported as part
of Live Argyll's Community Learning and Development partnership. Through our partners,
we receive referrals for literacy and numeracy support for adult learners – many of which we
are currently unable to engage with due to lack of resources. 
 Progression for Learners
With a small workforce across Argyll and Bute, any learners who are supported with
literacy and numeracy would have a pathway into further support in our Community
Learning and Employability Hubs which are run in partnership with Skills Development
Scotland and the Department of Work and Pensions. We also have a strong symbiotic
relationship with Argyll College (UHI Argyll). We support their learners who require some
additional literacy and numeracy support, and they provide a pathway into further
education for those who wish to progress. 
 Vulnerable School Leavers
There is an opportunity to work closely with the Developing Young Workforce Leads to
ensure that vulnerable school leavers are effectively supported into employment by
expanding the Wider Achievement Programme for all secondary schools, delivered in
partnership.   
 Young People
We have the opportunity to deliver a coherent programme of wider achievement
qualifications and skill-focused volunteering opportunities for all secondary pupils, delivered
in partnership with agencies and organisations in the wider community. Examples could
include qualifications relating to food hygiene, first aid, heart start, Duke of Edinburgh and
voluntary work, could encompass areas such as food banks and environmental
improvement and conservation. The programme will allow curricula in schools to reflect the
four contexts for learning within Building the Curriculum 3, and in particular the three
related to ethos and community, inter-disciplinary learning and personal achievement. The
Wider Achievement Programme is designed to allow skills progression for all young people
within the school as they progress through the curriculum, and the development of their
resilience, confidence and aspiration. The programme will increase engagement with
school-based education for the most disengaged and vulnerable children and young
people, increasing attendance and further reducing exclusion rates. Finally, the programme
would also lead to a significant rise in the number of qualifications gained outside of the
narrow band of National Qualifications. The proposals in this Investment Plan are thus
coherent with the direction of travel nationally, where vocational and skills-based education
is being developed and promoted in terms of its accessibility to young people and parity of
esteem beside national qualifications. 
 Social Economy 
Delivers a range of essential services to communities with limited capacity and skills.
Working with partners across the third sector with experience in supporting and nurturing
those facing barriers to work, alongside training providers and those with specialist
expertise in skills shortage areas to enable effective access and progression routes within
Page 207

Page 208

skills shortage areas (construction, tourism and hospitality, care and social economy as
well as evolving economy including blue and green economy opportunities). Expertise
within organisations to assist those facing barriers to build skills enabling people to
progress in to longer term employment which in turn addresses skills shortages. 
Interventions
In this section, we will ask you about:
 Interventions you’ve chosen for each year of funding
 Outcomes you want to deliver
 Any interventions that are not listed here
 How these interventions fall under the UKSPF investment priorities, and your
rationale for them
 Interventions not included in our list will be assessed before being approved, where
you will need to show a clear rationale, how the intervention is value for money, what
outcomes it will deliver and how you will monitor and evaluate the intervention. This
may include a theory of change or logic chain.
WHAT ARE THE OUTCOMES YOU WANT TO DELIVER UNDER THE COMMUNITIES AND
PLACE INVESTMENT PRIORITY? SELECT ALL THAT APPLY.
Outcome  Tick if
applicable
Jobs created 
Jobs safeguarded 
Increased footfall √
Increased visitor numbers √
Reduced vacancy rates 
Greenhouse gas reductions 
Improved perceived/experienced accessibility 
Improved perception of facilities/amenities √
Increased number of properties better protected from flooding and coastal erosion 
Increased users of facilities / amenities √
Improved perception of facility/infrastructure project √
Increased use of cycleways or paths 
Increase in Biodiversity 
Increased affordability of events/entry 
Improved perception of safety 
Reduction in neighbourhood crime 
Improved engagement numbers √
Improved perception of events 
Increased number of web searches for a place √
Volunteering numbers as a result of support √
Number of community-led arts, cultural, heritage and creative programmes as a result
of support 
Increased take up of energy efficiency measures √
Increased number of projects arising from funded feasibility studies  
Number of premises with improved digital connectivity √
None of the above 
SELECT THE INTERVENTIONS YOU INTEND TO
USE WHICH MEET THE COMMUNITIES AND
PLACE INVESTMENT PRIORITY. YOU CAN
SELECT AS MANY AS YOU LIKE. 
Intervention
A full list of nation-specific interventions is available in the relevant annex to the Prospectus. 
Page 208

Page 209

S7: Funding for the development and promotion of wider campaigns which encourage people to
visit and explore local areas..
S8: Funding for impactful volunteering and/or social action projects to develop social and human
capital in local places.
S9: Investment in capacity building, resilience (including climate change resilience) and
infrastructure support for local civil society and community groups.
S10: Community measures to reduce the cost of living, including through measures to improve
energy efficiency, and combat fuel poverty and climate change.
S12: Investment and support for digital infrastructure for local community facilities.
S13: Support for linking communities together and with employment opportunities with a focus on
decarbonisation. 
DO YOU PLAN TO USE ANY INTERVENTIONS NOT INCLUDED IN THE COMMUNITIES AND
PLACE LIST?
State the name of each of these additional interventions and a brief description of each of
these 
No 
Explain how each intervention meets the Communities and Place investment priority. Give
evidence where possible, including why it is value money and the outcomes you want to
deliver. 
N/A 
Do you consider that any of these interventions may provide a subsidy to potential
recipients of the funding under the intervention’s planned activity? All bids must also
consider how they will deliver in line with subsidy control as set out in the guidance.
Yes No
Detail the assessment you undertook to consider whether the intervention is a subsidy and
any specific measures you will take to make sure the subsidy is permitted.   
HAVE YOU ALREADY IDENTIFIED ANY PROJECTS WHICH FALL UNDER THE
COMMUNITIES AND PLACE INVESTMENT PRIORITY?
Describe these projects, including how they fall under the Communities and Place
investment priority and the location of the proposed project.
1. Tourism Marketing Support - design and execution of marketing campaigns and events
strategy to deliver increased visitor numbers, improved visitor economy and benefit local
businesses.  Argyll and Bute wide. (S7)
2. Community Planning Partnership Climate Change Working Group building capacity in
communities, including peer support for community organisations and funding to support
community projects with a focus on climate change. Bring communities together to share
best practice in community action for climate change, raise volunteer numbers and support
wider influence of actions locally and across Argyll and Bute. Argyll and Bute wide. (S8)
3. Extension of Shaping Places for Wellbeing support, to take forward needs identified
and improve community cohesion, place and wellbeing. Shaping Places for Wellbeing is an
innovative partnership project to inform systems change to address better health and
wellbeing. There is a project worker in place that, with the funds provided through this,
could add value by being able to deliver community based changes to improve community
and place such as: improved perception of the area; community notice boards, active travel
promotion. Argyll and Bute wide. (S9)
4. Vibrant and Living Places to support a small scale place based investment and town
centre fund (possibly including shop front improvements & development of digital apps),
pocket parks and green spaces including stalled spaces, and restoring historic features,
heritage, arts and cultural small scale projects (including public art). Argyll and Bute wide.
(S9)
Page 209

Page 210

5. Extension of Flexible Food Fund providing short term grants to people struggling with the
cost of living crisis, advice and skills support and referral to partners. Argyll and Bute
Council is working with third sector organisations, Bute Advice Centre and the Argyll,
Lomond and the Islands energy advice group (ALIenergy) to provide short-term grant
funding to people who are struggling due to the cost of living crisis and increased fuel costs
based on the minimum income standard with a rural uplift. Customers are offered a second
grant payment if they engage with the advice services available such as benefits
maximisation, budgeting skills, money and debt advice. In addition a referral is made to
ALIEnergy and fuel debt relief, fuel poverty advice, behavioural change, the purchase of
white goods and the provision of fuel vouchers can all be arranged. Argyll and Bute wide.
(S10) 
6. Community Hubs to increase digital capacity and skills in communities, alongside
community asset improvements.  Development of hubs which support community
organisations and volunteers to come together to share best practice, ideas and increase
capacity and resilience. Argyll and Bute wide. (S12)
7. Pre-loved School Uniform project, supporting an eco-friendly re-used school uniform
bank. Argyll and Bute wide. (S13)
Do you consider these projects may provide a subsidy to potential recipients of the funding
under the proposed planned activity? All bids must also consider how they will deliver in
line with subsidy control as set out in the guidance.
Yes No
Detail the assessment you undertook to consider whether the proposed projects constitute
a subsidy and any specific measures you will take to make sure the subsidy is permitted.
Argyll and Bute Council must ensure that any subsidies (includes grants, loans at below market
rate, loan guarantees at below market rate, tax breaks/relief or allowing a company to use publicly
owned office space rent free) awarded to economic actors (anyone who puts goods or services on
a market and could include a public body or a charity if they are acting commercially) comply with
the UK’s international obligations. These include World Trade Organisation (WTO) rules and trade
agreements such as the EU-UK Trade and Co-operation Agreement (EU-UK TCA). 
A Subsidy Risk Assessment was undertaken for interventions included in the Argyll and Bute
UKSPF Investment Plan when support from the council might potentially be subject to these
international agreements on controlling public subsidies. 
With regard to the relevant projects outlined in the Argyll and Bute UKSPF Investment Plan, the
following questions have been posed:
1) Is the support given by a public authority?
2) Is the recipient of support an economic actor (i.e. placing goods or services on the
market)?
3) Does the support provide a financial or in-kind benefit to the recipient which is not
otherwise available on commercial/market terms?
4) Could the support affect international trade? 
If the answer to all of the above questions was ‘Yes’, then the support is a subsidy. 
If the answer to any of the above was ‘No’, then the support is not a subsidy. 
No further action is required and the recipient will be advised that this award is not a
subsidy as per the UK’s international obligations. 
WHAT ARE THE OUTCOMES YOU WANT TO DELIVER UNDER THE SUPPORTING LOCAL
BUSINESS INVESTMENT PRIORITY? SELECT ALL THAT APPLY.
Outcome  Tick if
applicable
Jobs created √
Jobs safeguarded 
Increased footfall 
Increased visitor numbers 
Reduced vacancy rates 
Greenhouse gas reductions 
Page 210

Page 211

Number of new businesses created √
Improved perception of markets 
Increased business sustainability 
Increased number of businesses supported √
Increased amount of investment 
Improved perception of attractions 
Number of businesses introducing new products to the firm 
Number of organisations engaged in new knowledge transfer activity √
Number of premises with improved digital connectivity 
Number of businesses adopting new to the firm technologies or processes √
Number of new to market products √
Number of R&D active businesses √
Increased number of innovation active SMEs √
Number of businesses adopting new or improved products or services 
Increased number of innovation plans developed 
Number of early stage firms which increase their revenue following support 
Number of businesses engaged in new markets 
Number of businesses engaged in new markets 
Number of businesses increasing their export capability 
Increased amount of low or zero carbon energy infrastructure installed 
Number of businesses with improved productivity √
Increased number of projects arising from funded feasibility studies  √
Increased number of properties better protected from flooding and coastal erosion 
None of the above 
SELECT THE INTERVENTIONS YOU INTEND TO USE WHICH MEET THE SUPPORTING
LOCAL BUSINESS INVESTMENT PRIORITY. YOU CAN SELECT AS MANY AS YOU LIKE.
Intervention
A full list of nation-specific interventions is available in the relevant annex to the Prospectus. 
S14: Funding for the development and promotion (both trade and consumer) of the visitor
economy, such as local attractions, trails, tours and tourism products more generally.
S15: SME development grants and support, aligned with local and regional sectoral priorities and
growth potential. This could include, providing tailored expert advice, matched grants and
leadership training to enable manufacturing SMEs to adopt industrial digital technology solutions
including AI artificial intelligence; robotics and autonomous systems; additive manufacturing;
industrial internet of things; virtual reality; data analytics. The support is proven to leverage high
levels of private investment into technologies that drive growth, productivity, efficiency and
resilience in manufacturing.
S16: Research and development grants supporting the development of innovative products and
services, with a particular focus on low carbon goods and environmental services, and climate
resilience. This could include investment to support the diffusion of innovation knowledge and
activities. Support the commercialisation of ideas, encouraging collaboration and accelerating the
path to market so that more ideas translate into industrial and commercial practices.
S22: Support for growing the local social economy, including community businesses, cooperatives
and social enterprises.
S26: Business support measures to drive employment growth, particularly in areas of higher
unemployment.
S29: Support for new and existing businesses and start-ups aligned with local, regional and
Scottish policy. 
Page 211

Page 212

DO YOU PLAN TO USE ANY INTERVENTIONS NOT INCLUDED IN THE SUPPORTING LOCAL
BUSINESS LIST?
State the name of each of these additional interventions and a brief description of each of
these 
No 
Explain how each intervention meets the Supporting Local Business investment priority.
Give evidence where possible, including why it is value money and the outcomes you want
to deliver. 
N/A 
Do you consider that any of these interventions may provide a subsidy to potential
recipients of the funding under the intervention’s planned activity?
All bids must also consider how they will deliver in line with subsidy control as set out in
the guidance.
Yes 
Detail the assessment you undertook to consider whether the intervention is a subsidy and
any specific measures you will take to make sure the subsidy is permitted. 
HAVE YOU ALREADY IDENTIFIED ANY PROJECTS WHICH FALL UNDER THE SUPPORTING
LOCAL BUSINESS INVESTMENT PRIORITY?
Describe these projects, including how they fall under the Supporting Local Business
investment priority and the location of the proposed project.
1. Tourism Sector Support. Improved digital infrastructure for data monitoring, evaluation &
visitor bookability. Argyll and Bute wide. (S14)
2. Scientific Robotics Academy SME development grants and support, aligned with local and
regional sectoral priorities and growth potential. This could include, providing tailored expert
advice, matched grants and leadership training to enable manufacturing SMEs to adopt
industrial digital technology solutions including AI artificial intelligence; robotics and
autonomous systems; additive manufacturing; industrial internet of things; virtual reality; data
analytics. The support is proven to leverage high levels of private investment into technologies
that drive growth, productivity, efficiency and resilience in manufacturing.  Argyll and Bute wide,
nationally and internationally. (S15)
3. Innovation Support Service providing expert advice and capability reviews to help SMEs
create innovation plans. Argyll and Bute wide. (S16)
4. Graduate Apprenticeship Opportunities in the Third Sector. Pilot subsidised employment
costs for social enterprises for one year (S22)
5. Graduate Placement Programme providing graduate placement grants covering staff, training
and travel costs. Argyll and Bute wide. (S26)
6. Business Development Package for local SMEs, providing enhanced start-up, recovery and
growth support comprising grants, specialist advice and intensive support programmes. Grants
to include costs for trade fair, accreditation, training, digital development, carbon reduction,
innovation, R&D, exporting, wage subsidy for new employee and graduate placements.
Specialist advice topics to include HR, Marketing, Digital, Finance, Tax, PR,
Procurement/supply chain development, Business strategy, Exporting/Importing, Innovation,
Intellectual Property, Net Zero. Argyll and Bute wide. (S29)
Do you consider these projects may provide a subsidy to potential recipients of the funding
under the proposed planned activity?
All bids must also consider how they will deliver in line with subsidy control as set out in
the guidance.
Yes No
Detail the assessment you undertook to consider whether the proposed projects constitute
a subsidy and any specific measures you will take to make sure the subsidy is permitted.
Page 212

Page 213

Argyll and Bute Council must ensure that any subsidies (includes grants, loans at below market
rate, loan guarantees at below market rate, tax breaks/relief or allowing a company to use publicly
owned office space rent free) awarded to economic actors (anyone who puts goods or services on
a market and could include a public body or a charity if they are acting commercially) comply with
the UK’s international obligations. These include World Trade Organisation (WTO) rules and trade
agreements such as the EU-UK Trade and Co-operation Agreement (EU-UK TCA). 
A Subsidy Risk Assessment was undertaken for interventions included in the Argyll and Bute
UKSPF Investment Plan when support from the council might potentially be subject to these
international agreements on controlling public subsidies. 
With regard to the relevant projects outlined in the Argyll and Bute UKSPF Investment Plan, the
following questions have been posed:
1) Is the support given by a public authority?
2) Is the recipient of support an economic actor (i.e. placing goods or services on the
market)?
3) Does the support provide a financial or in-kind benefit to the recipient which is not
otherwise available on commercial/market terms?
4) Could the support affect international trade? 
If the answer to all of the above questions was ‘Yes’, then the support is a subsidy. 
If the answer to any of the above was ‘No’, then the support is not a subsidy. 
No further action is required and the recipient will be advised that this award is not a
subsidy as per the UK’s international obligations. 
WHAT ARE THE OUTCOMES YOU WANT TO DELIVER UNDER THE PEOPLE AND SKILLS
INVESTMENT PRIORITY? SELECT ALL THAT APPLY.
Outcome  Tick if
applicable
Number of economically inactive individuals in receipt of benefits they are
entitled to following support √
Increased active or sustained participants of UKSPF beneficiaries in
community groups [and/or] increased employability through development of
interpersonal skills
√
Increased proportion of participants with basic skills (English, maths, digital
and ESOL) 
Number of people in supported employment [and] number of people engaging
with mainstream healthcare services √
Number of people sustaining engagement with keyworker support and
additional services √
Number of people engaged in job-searching following support 
Number of people in employment, including self-employment, following
support √
Number of people sustaining employment for 6 months 
Increased employment, skills and/or UKSPF objectives incorporated into local
area corporate governance 
Number of people in education/training √
Increased number of people with basic skills (English, maths, digital and
ESOL) √
Fewer people facing structural barriers into employment and into skills
provision 
Increased number of people familiarised with employers’ expectations,
including, standards of behaviour in the workplace √
Fewer people facing structural barriers into employment and into skills
provision √
Page 213

Page 214

Number of people gaining a qualification or completing a course following
support √
Number of people gaining qualifications, licences, and skills 
Number of economically active individuals engaged in mainstream skills
education, and training. 
Number of people engaged in life skills support following interventions 
Number of people with proficiency in pre-employment and interpersonal skills
(relationship, organisational and anger-management, interviewing, CV and job
application writing) 
Multiply only - Increased number of adults achieving maths qualifications up to, and
including, Level 2. 
√
Multiply only - Increased number of adults participating in maths qualifications and
courses up to, and including, Level 2.
√
None of the above 
SELECT THE INTERVENTIONS YOU INTEND TO USE WHICH MEET THE PEOPLE AND
SKILLS INVESTMENT PRIORITY. YOU CAN SELECT AS MANY AS YOU LIKE.
Intervention
A full list of nation-specific interventions is available in the relevant annex to the Prospectus. 
S31: Employment support for economically inactive people: intensive and wrap-around one-to-one
support to move people closer towards mainstream provision and employment., supplemented by
additional and/or specialist life and basic skills (digital, English, maths (Multiply) and ESOL) support
where there are local provision gaps.
S33: Activities such as enrichment and volunteering to improve opportunities and promote
wellbeing.
S35: Support for employability programmes and advice including alignment with the No One Left
Behind agenda, Fair Start Scotland and Scottish employability pipeline. This could include tailored
support to help people in employment, who are not supported by mainstream provision to address
barriers to accessing education and training courses. 
DO YOU PLAN TO USE ANY INTERVENTIONS NOT INCLUDED IN THE PEOPLE AND SKILLS
LIST?
State the name of each of these additional interventions and a brief description of each of
these 
No 
Explain how each intervention meets the People and Skills investment priority. Give
evidence where possible, including why it is value money and the outcomes you want to
deliver. 
N/A 
Do you consider that any of these interventions may provide a subsidy to potential
recipients of the funding under the intervention’s planned activity?
All bids must also consider how they will deliver in line with subsidy control as set out in
the guidance.
Yes No
Page 214

Page 215

Detail the assessment you undertook to consider whether the intervention is a subsidy and
any specific measures you will take to make sure the subsidy is permitted. 
ENGLAND ONLY: People and Skills interventions can only be used in 2022-2023 and
2023-2024 if you have identified a local voluntary and community provision, previously
supported by the European Social Fund, at risk of closure. If you have not identified a
suitable provision, you will not be able to select interventions for 2022-2023 and 2023-
2024 and your investment plan will not be approved.
HAVE YOU ALREADY IDENTIFIED ANY PROJECTS for 2024-2025 WHICH FALL UNDER THE
PEOPLE AND SKILLS INVESTMENT PRIORITY?
Yes
Describe the projects for 2024-25, including how they fall under the People and Skills
investment priority and the location of the proposed project. 
Do you consider these projects may provide a subsidy to potential recipients of the funding
under the proposed planned activity?
All bids must also consider how they will deliver in line with subsidy control as set out in
the guidance.
Yes
Detail the assessment you undertook to consider whether the proposed projects constitute
a subsidy and any specific measures you will take to make sure the subsidy is permitted. 
HAVE YOU IDENTIFIED A LOCAL VOLUNTARY PROVISION AT RISK AS PART OF YOUR
PEOPLE AND SKILLS INVESTMENT PRIORITIES?
Yes No
(If Yes) Describe the local voluntary provision at risk and your rationale for supporting it. 
Provide the European Social Fund Project Names and Project References for this voluntary
and community provision at risk. 
What year do you intend to fund these projects? Select all that apply.
2022-2023 2023-2024 2024-2025
Describe the projects for 2022-2023 and 2023-2024, including how they fall under the People
and Skills investment priority and the location of the proposed project. 
Do you consider these projects may provide a subsidy to potential recipients of the funding
under the proposed planned activity?
Page 215

Page 216

All bids must also consider how they will deliver in line with subsidy control as set out in
the guidance.
Yes No
Detail the assessment you undertook to consider whether the proposed projects constitute
a subsidy and any specific measures you will take to make sure the subsidy is permitted. 
SCOTLAND, WALES & NORTHERN IRELAND ONLY
HAVE YOU ALREADY IDENTIFIED ANY PROJECTS WHICH FALL UNDER THE PEOPLE AND
SKILLS INVESTMENT PRIORITY?
Yes No
Describe the projects, including how they fall under the People and Skills investment
priority and the location of the proposed project. 
1. Pre-Employability Support Programme.  Initial assessment, action planning and support,
with individually tailored keyworker support for those furthest from the labour market. Argyll and
Bute wide. (S31)
2. Adult Literacy and Numeracy Programme. Cohesive locally tailored support for those
furthest from the labour market providing access to literacy and numeracy skills, with pathways
into employability support and mentoring.  Argyll and Bute wide. (S31)
3. Expansion of the Wider Achievement Programme for all secondary schools, providing
support to assist vulnerable school leavers into employment via skills-based volunteering as
part of an enhanced curriculum. Argyll and Bute wide. (S33)
4. Pre-Employability Support Programme Work Placements, providing individually tailored
paid work placements. Argyll and Bute wide. (S33)
5. Positive Destinations Programme, providing support for young people leaving care with no
positive destination, those with a learning disability, those leaving the criminal justice system, 
support to boost confidence for those who have been economically inactive and support for
those who require assistance in determining suitable employment or training pathways. Argyll
and Bute wide. (S33) 
6. Pre-Employability Support Programme Training, providing access to funded training
courses. Argyll and Bute wide. (S35)
7. Supported Employment Experience in the Third Sector. Intermediate Labour Market
support for those not in employment, offering a waged employment experience, training, and
support to participant and third sector employer. Argyll and Bute wide. (S35)
Do you consider these projects may provide a subsidy to potential recipients of the funding
under the proposed planned activity? 
All bids must also consider how they will deliver in line with subsidy control as set out in
the guidance.
Yes No
Detail the assessment you undertook to consider whether the proposed projects constitute
a subsidy and any specific measures you will take to make sure the subsidy is permitted.
Argyll and Bute Council must ensure that any subsidies (includes grants, loans at below market
rate, loan guarantees at below market rate, tax breaks/relief or allowing a company to use publicly
owned office space rent free) awarded to economic actors (anyone who puts goods or services on
a market and could include a public body or a charity if they are acting commercially) comply with
the UK’s international obligations. These include World Trade Organisation (WTO) rules and trade
agreements such as the EU-UK Trade and Co-operation Agreement (EU-UK TCA). 
A Subsidy Risk Assessment was undertaken for interventions included in the Argyll and Bute
UKSPF Investment Plan when support from the council might potentially be subject to these
international agreements on controlling public subsidies. 
With regard to the relevant projects outlined in the Argyll and Bute UKSPF Investment Plan, the
following questions have been posed:
1) Is the support given by a public authority?
Page 216

Page 217

2) Is the recipient of support an economic actor (i.e. placing goods or services on the
market)?
3) Does the support provide a financial or in-kind benefit to the recipient which is not
otherwise available on commercial/market terms?
4) Could the support affect international trade? 
If the answer to all of the above questions was ‘Yes’, then the support is a subsidy. 
If the answer to any of the above was ‘No’, then the support is not a subsidy. 
No further action is required and the recipient will be advised that this award is not a
subsidy as per the UK’s international obligations. 
Approach to delivery and governance
In this section, we will ask you about:
 Structures you have in place to support delivery
 Support you have from stakeholders and the local community
 How you’ve engaged with MPs as part of your investment plan
 Opportunities you have identified to work with other places
Places need to show how MPs that cover the lead local authority have been engaged on the
investment plan and whether they support it. More detail on the role of MPs can be found
here.
STAKEHOLDER ENGAGEMENT AND SUPPORT
Have you engaged with any of the following as part of your investment plan? Select all that
apply.
Public sector organisations Private sector organisations Civil society organisations
Describe how you have engaged with any of these organisations. Give examples where
possible.
A Partnership Group was established that was made up of members of the current Argyll and Bute
Community Planning Partnership and expanded to include other stakeholders. Information on the
allocation also communicated to the Argyll Economic Resilience Forum (private sector
organisations).
Summarise the governance structures you have in place, including how any advisory panels
or associated partnership groups are made up
The Final Argyll and Bute UKSPF Investment Plan was considered at the Argyll and Bute Council
Policy and Resources Committee on 11th August 2022. 
Many of the projects are from members of discrete partnerships which report to the Argyll and Bute
Community Planning Partnership Management Committee, such as: 
 Community Planning Partnership; Community Planning Partnership Climate Change
working group – Communities and Place project governance. 
 Community Learning and Development (CLD)  Partnership – Communities and Place
project governance 
 Argyll and Bute Employability Partnership (ABEP). 
Confirm all MPs covering your lead local authority have been invited to join the local
partnership group.
Yes: Brendan O’Hara – separate discussion No
Are there MPs who are not supportive of your investment plan? tbc
Yes  No
(If Yes) Who are the MPs that are not supportive and outline their reasons why. 
Page 217

Page 218

PROJECT SELECTION
Are you intending to select projects in any way other than by competition for funding?
Yes No
(If Yes) Describe your approach to selecting projects, and why you intend to do it this way.
As the initial proposals for inclusion in the Argyll and Bute UKSPF Investment Plan were 220%
greater than the allocation, everyone who submitted a proposal was asked to confirm the minimum
viable project cost, where costs could be scaled back and identify any interventions that could be
dropped. As costs were still higher than the allocation further to this exercise, officers developed
eligibility criteria and an associated RAG scoring system For instance, consideration was given to
the wider policy and funding landscape, existing activities and programmes, other new funding
opportunities and other complementary interventions from other national or local schemes. This
was then followed up by discussions with all internal colleagues, partners and stakeholders to
enable the preparation of the final plan for approval at the Argyll and Bute Council Policy and
Resources Committee meeting on 11th August 2022. 
Delivery of some projects will be subject to a grant offer and/or competitive procured approach with
support and advice from Argyll and Bute Council’s Procurement Team. These processes will be put
in place during the late summer/early autumn, so that we will be ready to start on the ground
delivery as soon as the Argyll and Bute UK Shared Prosperity Fund Investment Plan is approved
by the UK Government (late October onwards). 
DO YOU INTEND TO WORK WITH OTHER PLACES ON ANY OF THE INTERVENTIONS
WHICH FALL UNDER THE COMMUNITIES AND PLACE INVESTMENT PRIORITY?
Which interventions do you intend to collaborate on? Select all that apply.
Intervention Tick if
applicable
A full list of nation-specific interventions is available in the relevant annex to the
Prospectus. 
S9: Investment in capacity building, resilience (including climate change resilience)
and infrastructure support for local civil society and community groups.

Describe any interventions not included in this list? 
Who are the places you intend to collaborate with? 
Shaping Places for Wellbeing – working with West Dunbartonshire, and five other local authorities
in Scotland. 
Page 218

Page 219

DO YOU INTEND TO WORK WITH OTHER PLACES ON ANY OF THE INTERVENTIONS
WHICH FALL UNDER THE SUPPORTING LOCAL BUSINESS INVESTMENT PRIORITY?
Which interventions do you intend to collaborate on? Select all that apply.
Intervention Tick if
applicable
A full list of nation-specific interventions is available in the relevant annex to the
Prospectus. 
S15: SME development grants and support, aligned with local and regional sectoral
priorities and growth potential. This could include, providing tailored expert advice,
matched grants and leadership training to enable manufacturing SMEs to adopt
industrial digital technology solutions including AI artificial intelligence; robotics and
autonomous systems; additive manufacturing; industrial internet of things; virtual
reality; data analytics. The support is proven to leverage high levels of private
investment into technologies that drive growth, productivity, efficiency and resilience
in manufacturing.
√
Describe any interventions not included in this list? 
Who are the places you intend to collaborate with? 
A range of individuals, institutes and organisations throughout the UK and further afield. 
DO YOU INTEND TO WORK WITH OTHER PLACES ON ANY OF THE INTERVENTIONS
WHICH FALL UNDER THE PEOPLE AND SKILLS INVESTMENT PRIORITY?
Which interventions do you intend to collaborate on? Select all that apply.
Intervention Tick if
applicable
A full list of nation-specific interventions is available in the relevant annex to the
Prospectus. 
S35: Support for employability programmes and advice including alignment with the
No One Left Behind agenda, Fair Start Scotland and Scottish employability pipeline.
This could include tailored support to help people in employment, who are not
supported by mainstream provision to address barriers to accessing education and
training courses.
√
Describe any interventions not included in this list? 
Page 219

Page 220

Who are the places you intend to collaborate with?
All other local authorities across Scotland in terms of standard approaches and governance issues
with regard to the Scottish Government’s No One Left Behind employability agenda and how this
complements and aligns the UKSPF Investment Plan interventions, in particular S35. 
PUBLIC SECTOR EQUALITY DUTY
How have you considered your public sector equality duty in the design of your investment
plan?
Yes. 
Fairer Scotland Duty - The Fairer Scotland Duty, Part 1 of the Equality Act 2010, came into
force in April 2018. The duty places a legal responsibility on particular public bodies in Scotland,
such as Argyll and Bute Council, to pay due regard to (actively consider) how they can reduce
inequalities of outcome, caused by socio-economic disadvantage, when making strategic decisions
and how this has been implemented. 
Equalities - all activities will comply with all Equal Opportunities/Fairer Scotland Duty policies and
obligations. 
Socio-economic Duty - all project activities will comply with the council’s socio-economic duty. 
Islands - interventions under the UKSPF will be delivered across the Argyll and Bute area,
including island communities. 
How will you consider your public sector equality duty when implementing your investment
plan, including in the selection of projects? 
All activities and interventions will comply with all Equal Opportunities/Fairer Scotland Duty policies
and obligations. This will be an essential criteria for all projects delivered through the Argyll and
Bute UK Shared Prosperity Fund Investment Plan. 
RISKS
Have you identified any key risks that could affect delivery, for example lack of staff or
expertise?
Yes No
(If Yes) Describe these risks or issues, including the contingency measures you have in
place to mitigate them. 
A staff resource will need to be employed to oversee the delivery, in particular the outputs and
outcomes, of all the projects included in the Argyll and Bute UK Shared Prosperity Fund Investment
Plan, 2022-25. 
Have you identified any key fraud risks that could affect UKSPF delivery?
Yes No
(If Yes) Describe these risks or issues, including the contingency measures you have in
place to mitigate them. 
Page 220

Page 221

Capacity and capability
In this section, we will ask you about:
 The capacity and capability of your team to manage funding
 The resources you have in place for work related to UKSPF
Your answers here will help us know how to support you with delivery. They will not affect
the amount of funding you will get.
Answer as honestly as possible.
TEAM RESOURCE
How many people (FTE) will be put in place to work with UKSPF funding?
1.5 new full-time equivalent jobs (FTEs) plus 2 FTEs of existing staff. 
Describe what role these people will have, including any seniority and experience.
Economic Growth Manager, Argyll and Bute Council (existing staff)
Senior Development Officer, Argyll and Bute Council, (existing post, currently vacant – will recruit).
New UKSPF Officer, Argyll and Bute Council (full-time: 100% funding)
New Administration Support, Argyll and Bute Council (part-time: 50% funding). 
 Strong capability: Has extensive experience and/or a proven track record of delivery
in this area.
 Strong capacity: High degree of confidence that there is enough staffing/resource to
manage funding in this area.
 Some capability: Has previous experience of delivery in this area.
 Some capacity: Confident that there is enough staffing/resource to manage funding
in this area.
 Limited capability: Does not have previous experience and/or no track record of
delivery in this area.
 Limited capacity: Limited confidence that there is enough staffing/resource to
manage funding in this area. Additional resource may be needed to support delivery.
CAPACITY AND CAPABILITY
How would you describe your team’s current experience of delivering funding and
managing growth funds?
Very experienced Some experience No previous experience
How would you describe your team’s current capability to manage funding for
procurement?
Strong capability Some capability Limited capability
How would you describe your team’s current capability to manage funding for
procurement?
Strong capability Some capability Limited capability
How would you describe your team’s current capacity to manage funding for procurement?
Strong capacity Some capacity Limited capacity
How would you describe your team’s current capability to manage funding for subsidies?
Strong capability Some capability Limited capability
How would you describe your team’s current capacity to manage funding for subsidies?
Strong capacity Some capacity Limited capacity 
Page 221

Page 222

COMMUNITIES AND PLACE CAPACITY AND CAPABILITY
Does your local authority have any previous experience of delivering the Communities and
Place interventions you have select?
Yes No
How would you describe your team’s current capability to manage funding for Communities
and Place interventions?
Strong capability Some capability Limited capability
Describe the key capability challenges (if you have any) for delivering Communities and
Place interventions. This may include challenges within your local authority and/or your
local/regional delivery system. 
Climate Change work – we are working with an established Climate Change working group of the
Community Planning Partnership. There is commitment from partners, including the third sector, to
undertake the associated project work on climate change activity. 
Describe what further support would help address these challenges. 
How would you describe your team’s current capacity to manage funding for Communities
and Place interventions?
Strong capability Some capability Limited capability
Describe the key capacity challenges (if you have any) for delivering Communities and
Place interventions. This may include challenges within your local authority and/or your
local/regional delivery system. 
Describe what further support would help address these challenges. 
SUPPORTING LOCAL BUSINESS CAPACITY AND CAPABILITY
Does your local authority have any previous experience of delivering the Supporting Local
Business interventions you have select?
Yes No
How would you describe your team’s current capability to manage funding for Supporting
Local Business interventions?
Strong capability Some capability Limited capability
Describe the key capability challenges (if you have any) for delivering Supporting Local
Business interventions. This may include challenges within your local authority and/or your
local/regional delivery system. 
Describe what further support would help address these challenges. 
Page 222

Page 223

How would you describe your team’s current capacity to manage funding for Supporting
Local Business interventions?
Strong capacity Some capacity Limited capacity
Describe the key capacity challenges (if you have any) for delivering Supporting Local
Business interventions. This may include challenges within your local authority and/or your
local/regional delivery system.
Staff resource. 
Describe what further support would help address these challenges. 
PEOPLE AND SKILLS CAPACITY AND CAPABILITY
Does your local authority have any previous experience of delivering the People and Skills
interventions you have select?
Yes No
How would you describe your team’s current capability to manage funding for People and
Skills interventions?
Strong capability Some capability Limited capability
Describe the key capability challenges (if you have any) for delivering People and Skills
interventions. This may include challenges within your local authority and/or your
local/regional delivery system. 
Describe what further support would help address these challenges. 
How would you describe your team’s current capacity to manage funding for People and
Skills interventions?
Strong capacity Some capacity Limited capacity
Describe the key capacity challenges (if you have any) for delivering People and Skills
interventions. This may include challenges within your local authority and/or your
local/regional delivery system.
Staff resource. 
Page 223

Page 224

Describe what further support would help address these challenges. 
SUPPORT TO DELIVERY UKSPF 
All lead authorities can use up to 4% of their UKSPF allocation to support the delivery of
their chosen interventions but by exception, lead authorities will be able to use more than
4%. Are you planning to use more than 4%? 
Yes No
(If Yes) Explain why you wish to use more than 4%. 
Approvals (to be finalised, subject to P&R approval)
Before submitting your investment plan, you should have approval from your:
 Chief Executive Officer
 Section 151 Officer
 Leader of your lead authority
Do you have approval from your Chief Executive Officer for this investment plan?
o Yes
o No
Do you have approval from your Section 151 Officer for this investment plan?
o Yes
o No
Do you have approval from the leader of your lead authority for this investment plan?
o Yes
o No
If you do not have approval from any of these people, please explain why this is: 
Additional documents
You will have received an email giving you access to a folder where you will need to upload
supporting evidence to your investment plan. All applicants must complete and upload the
following spreadsheet to the folder prior to submitting their investment plan:
Page 224

Page 225

- UKSPF Expenditure Profile spreadsheet
- UKSPF Indicative Deliverables spreadsheet 
Your investment plan submission will be considered incomplete without the required
documents.
Have you completed and uploaded the two spreadsheets to the SharePoint
folder as requested?
o Yes
o No  
Page 225

Page 226

SUMMARY OF PROJECTS AND PROGRAMMES 
For easy reference, Table A1 presents a summary of the projects and programmes
for inclusion in the Argyll and Bute UKSPF Investment Plan. 
Table A1: Summary of Argyll and Bute UKSPF Investment Plan Projects /
Programmes
Communities and Place
Predefined Intervention Project Allocation (exc.
admin)
S7: Funding for the development and
promotion of wider campaigns which
encourage people to visit and explore
local areas.
Tourism
Marketing
Support
£155,000
S8: Funding for impactful volunteering
and/or social action projects to develop
social and human capital in local places.
Community
Planning
Partnership
Climate Change
Working Group –
community
capacity building
£60,000
S9: Investment in capacity building,
resilience (including climate change
resilience) and infrastructure support for
local civil society and community groups.
Extension of
Shaping Places
for Wellbeing
Support
£6,000
Vibrant and Living
Spaces
£304,262
S10: Community measures to reduce the
cost of living, including through
measures to improve energy efficiency,
and combat fuel poverty and climate
change.
Extension of
Flexible Food
Fund - grants,
advice and skills
support for people
struggling with
cost of living
£408,000 
S12: Investment and support for digital
infrastructure for local community
facilities.
Community Hubs £81,750
S13: Support for linking communities
together and with employment
opportunities with a focus on
decarbonisation.
Pre-loved School
Uniform Project
£140,000
Sub-total allocation for Communities and Place £1,155,012 
Supporting Local Businesses
Predefined Intervention Project Allocation (exc.
admin)
S14: Funding for the development and
promotion (both trade and consumer) of
Tourism Sector
Support –
£45,000 
Page 226

Page 227

the visitor economy, such as local
attractions, trails, tours and tourism
products more generally.
improved digital
infrastructure for
data monitoring,
evaluation &
visitor book ability 
Supporting Local Businesses (continued)
Predefined Intervention Project Allocation (exc.
admin)
S15: SME development grants and
support, aligned with local and regional
sectoral priorities and growth potential.
This could include, providing tailored
expert advice, matched grants and
leadership training to enable
manufacturing SMEs to adopt industrial
digital technology solutions including AI
artificial intelligence; robotics and
autonomous systems; additive
manufacturing; industrial internet of
things; virtual reality; data analytics. The
support is proven to leverage high levels
of private investment into technologies
that drive growth, productivity, efficiency
and resilience in manufacturing.
Scientific Robotics
Academy
£299,900 
S16: Research and development grants
supporting the development of
innovative products and services, with a
particular focus on low carbon goods
and environmental services, and climate
resilience. This could include investment
to support the diffusion of innovation
knowledge and activities. Support the
commercialisation of ideas, encouraging
collaboration and accelerating the path
to market so that more ideas translate
into industrial and commercial practices. 
Innovation
Support Service
providing expert
advice and
capability reviews
to help SMEs
create innovation
plans
£100,000
S22: Support for growing the local social
economy, including community
businesses, cooperatives and social
enterprises.
Graduate
Apprenticeship
Opportunities in
the Third Sector
£71,154
S26: Business support measures to
drive employment growth, particularly in
areas of higher unemployment.
Graduate
Placement
Programme
providing
graduate
placement grants
covering staff,
£180,000
Page 227

Page 228

training and travel
costs
S29: Support for new and existing
businesses and start-ups aligned with
local, regional and Scottish policy.
Business
Development
Package for local
SMEs, providing
enhanced start-
up, recovery and
growth support
comprising grants,
specialist advice
and intensive
support
programmes
£454,000
Sub-total allocation for Supporting Local Businesses £1,150,054 
People and Skills 
Predefined Intervention Project Allocation (exc.
admin)
S31: Employment support for
economically inactive people: intensive
and wrap-around one-to-one support to
move people closer towards mainstream
provision and employment.,
supplemented by additional and/or
specialist life and basic skills (digital,
English, maths (Multiply) and ESOL)
support where there are local provision
gaps.
Pre-Employability
Support
Programme
£71,179
Adult Literacy and
Numeracy
Programme
£165,559 
People and Skills
Predefined Intervention Project Allocation (exc.
admin)
S33: Activities such as enrichment and
volunteering to improve opportunities
and promote wellbeing
Expansion of the
Wider
Achievement
Programme for all
secondary
schools
£125,000
Pre-Employability
Support
Programme Work
Placements
£331,410
Positive
Destinations
Programme,
providing support
for young people
£137,475
Page 228

Page 229

S35: Support for employability
programmes and advice including
alignment with the No One Left Behind
agenda, Fair Start Scotland and Scottish
employability pipeline. This could include
tailored support to help people in
employment, who are not supported by
mainstream provision to address barriers
to accessing education and training
courses.
Pre-Employability
Support
Programme
Training
£97,765
Supported
Employment
Experience in the
Third Sector
£336,850
Sub-total allocation for People and Skills £1,265,238
Overall Allocation (exc. admin) £3,570,304 
The above projects/programmes in Table A1 will involve a mixture of delivery
models (again predefined by the UK Government) as follows:
 In-house provision;
 Procurement of service provision;
 Grants to public or private organisations; or
 Commissioning third party organisations. 
At present the majority of the Multiply budget will be subject to a procurement
process. 
Page 229

Page 230

This page is intentionally left blank

Page 231

Appendix B: Project Scoring Assessment Framework 
Key to scoring: Pan Argyll
delivery
Replacement
of Structural
Fund activity
Fit with local
priorities
Building/
extending
proven project
Additionality No alternative
funds available
Delivery
infrastructure in
place
•
Project
delivers across
all of Argyll
and Bute
Replacement
of current
Structural
Funds project
Aligns to
Argyll and
Bute
priorities
Track record
of successful
previous
project in
evidence
Project would
not go ahead
without
UKSPF
No other
options
Can be delivered
with existing
resources (staff,
processes)
•
Geographically
limited
currently but
project will roll
out
Links to
previous
Structural
Funds projects
Aligns to
regional or
national
priorities
New project to
Argyll but
successful
elsewhere
UKSPF will
increase scale,
quality or
duration of
project
Other funds
could be
utilised for
some of the
project
Uses existing
resources but
requires
additional
resources
•
Project is
localised and
will remain so
Project has no
previous
Structural
Funds support
No
alignment New activity
Project would
go ahead
anyway
Other funds
could be
utilised for all
of the project
No resources
currently in place
to deliver 
Page 231

Page 232

This page is intentionally left blank

Page 233

Version 2
Funding Profile:
Funding Sources 2022-23 2023-24 2024-25 Total
UKSPF Allocation excluding Multiply £451,343 £902,686 £2,365,038 £3,719,067
Multiply Allocation £234,698 £270,806 £270,806 £776,310
Total UKSPF Allocation £686,041 £1,173,492 £2,635,844 £4,495,377
Please complete the funding profile for the three years. The funding profile total should correspond with your expenditure profile (Table B) totals.
Appendix C - UKSPF Expenditure SpreadsheetTable A - Funding Profile
Page 233

Page 234

Expenditure Profile
Investment Priority Intervention UKSPF Allocation % of Total UKSPF
Allocation 2022-23 2023-24 2024-25
Annual
Expenditure
Totals
Capital 22/23 Revenue 22/23 Capital 23/24 Revenue 23/24 Capital 24/25 Revenue 24/25 Capital/Revenue
Totals
Supporting comments relating to
expenditure
Communities & Place S1: Place based investments, regen & town centre improvements 0% £0 £0
Communities & Place S2: Support/improve community assets & infrastructure projects 0% £0 £0
Communities & Place S3: Improvements to the natural environment, green & open space 0% £0 £0
Communities & Place S4: Design & management of the built & landscaped environment 0% £0 £0
Communities & Place S5: Support sport, arts, cultural, heritage & creative activities 0% £0 £0
Communities & Place S6: Active travel enhancements & small scale transport projects 0% £0 £0
Communities & Place S7: Campaigns to encourage visiting & exploring the local area £163,991 4% £55,000 £50,000 £50,000 £155,000 £0 £55,000 £0 £50,000 £0 £50,000 £155,000
Communities & Place S8: Impactful volunteering and/or social action projects £68,991 2% £20,000 £20,000 £20,000 £60,000 £20,000 £0 £15,000 £5,000 £15,000 £5,000 £60,000
Communities & Place S9: Investment in capacity building & resilience for local groups £328,244 9% £2,000 £57,359 £250,903 £310,262 £0 £0 £57,359 £0 £250,903 £0 £308,262
Communities & Place S10: Community measures to reduce the cost of living £416,991 11% £0 £0 £480,000 £480,000 £0 £0 £0 £0 £0 £408,000 £408,000
Communities & Place S11: Relevant feasibility studies 0% £0 £0
Communities & Place S12: Digital infrastructire for local community facilities £90,741 2% £20,000 £30,875 £30,875 £81,750 £0 £20,000 £0 £30,875 £0 £30,875 £81,750
Communities & Place S13: Linking communities with employment opportunities - decarbonisation £148,991 4% £0 £70,000 £70,000 £140,000 £0 £0 £0 £70,000 £0 £70,000 £140,000
Communities & Place Total for 'On-menu' Interventions £1,217,949 32% £97,000 £228,234 £901,778 £1,227,012 £20,000 £75,000 £72,359 £155,875 £265,903 £563,875 £1,153,012
Communities & Place Insert Bespoke Intervention 0% £0 £0
Communities & Place Insert Bespoke Intervention 0% £0 £0
Communities & Place Insert Bespoke Intervention 0% £0 £0
Communities & Place Insert Bespoke Intervention 0% £0 £0
Communities & Place Insert Bespoke Intervention 0% £0 £0
Communities & Place C&P Bespoke Interventions Total £0 0% £0 £0 £0 £0 £0 £0 £0 £0 £0 £0 £0
Communities & Place Communities & Place Interventions Total £1,217,949 32% £97,000 £228,234 £901,778 £1,227,012 £20,000 £75,000 £72,359 £155,875 £265,903 £563,875 £1,153,012
Local Business S14: Development & promotion of the visitor economy £53,991 1% £10,000 £15,000 £20,000 £45,000 £0 £10,000 £0 £15,000 £0 £20,000 £45,000
Local Business S15: SME development grants & support. £308,891 8% £35,800 £100,000 £164,100 £299,900 £10,000 £25,800 £0 £100,000 £0 £164,100 £299,900
Local Business S16: R&D grants supporting innovative product & services £108,991 3% £20,000 £40,000 £40,000 £100,000 £0 £20,000 £0 £40,000 £0 £40,000 £100,000
Local Business S17: Development & support of appropriate innovation infrastructure 0% £0 £0
Local Business S18: Investing in enterprise infrastructure, site development projects 0% £0 £0
Local Business S19: Strengthening local entrepreneurial ecosystems 0% £0 £0
Local Business S20: Expert business advice & support programmes, local & regional 0% £0 £0
Local Business S21: Bid for & host international business events 0% £0 £0
Local Business S22: Growing the local social economy. £80,145 2% £0 £35,577 £35,577 £71,154 £0 £0 £0 £35,577 £0 £35,577 £71,154
Local Business S23: Develop angel investor networks nationwide 0% £0 £0
Local Business S24: Export grants to support businesses to grow overseas trading 0% £0 £0
Local Business S25: Developing existing or emerging local strengths - low carbon & climate 0% £0 £0
Local Business S26: Business support measures to drive employment growth £188,991 5% £30,000 £75,000 £75,000 £180,000 £0 £30,000 £0 £75,000 £0 £75,000 £180,000
Local Business S27: Support relevant feasibility studies 0% £0 £0
Local Business S28: Business resilience & Covid-19 recovery 0% £0 £0
Local Business S29: Business support aligned with local, regional & Scottish policy £462,991 12% £0 £95,897 £358,103 £454,000 £0 £0 £28,769 £67,128 £142,431 £215,672 £454,000
Local Business S30: Investment to protect from natural hazards, flooding & coastal erosion 0% £0 £0
Local Business Total for 'On-menu' Interventions £1,204,000 32% £95,800 £361,474 £692,780 £1,150,054 £10,000 £85,800 £28,769 £332,705 £142,431 £550,349 £1,150,054
Local Business Insert Bespoke Intervention 0% £0 £0
Local Business Insert Bespoke Intervention 0% £0 £0
Local Business Insert Bespoke Intervention 0% £0 £0
Local Business Insert Bespoke Intervention 0% £0 £0
Local Business Insert Bespoke Intervention 0% £0 £0
Local Business LB Bespoke Interventions Total £0 0% £0 £0 £0 £0 £0 £0 £0 £0 £0 £0 £0
Local Business Local Business Interventions Total £1,204,000 32% £95,800 £361,474 £692,780 £1,150,054 £10,000 £85,800 £28,769 £332,705 £142,431 £550,349 £1,150,054
People & Skills S31: Employment support for economically inactive people £254,720 7% £36,630 £76,818 £123,291 £236,739 £0 £36,630 £0 £76,818 £0 £123,291 £236,739
People & Skills S32: Courses including basic skills for those not economically inactive 0% £0 £0
People & Skills S33: Enrichment & volunteering activities £620,858 17% £132,167 £115,116 £346,602 £593,885 £15,940 £116,227 £12,708 £102,408 £12,808 £333,794 £593,885
People & Skills S34: Increase levels of digital inclusion, essential digital skills 0% £0 £0
People & Skills S35: Employability programmes & advice - No One Left Behind agenda etc £452,597 12% £71,692 £84,938 £277,985 £434,615 £0 £71,692 £0 £84,938 £0 £277,985 £434,615
People & Skills S36: Local areas to fund local skills needs 0% £0 £0
People & Skills S37: Green skills courses 0% £0 £0
People & Skills S38: Support local digital skills 0% £0 £0
People & Skills S39: Education & skills targeting the vulnerable leaving school 0% £0 £0
People & Skills S40: Support for community learning & development 0% £0 £0
People & Skills S41: New partnership & project-based entrepreneurial learning 0% £0 £0
People & Skills Total for 'On-menu' Interventions £1,328,175 35% £240,489 £276,872 £747,878 £1,265,239 £15,940 £224,549 £12,708 £264,164 £12,808 £735,070 £1,265,239
People & Skills Insert Bespoke Intervention 0% £0 £0
People & Skills Insert Bespoke Intervention 0% £0 £0
People & Skills Insert Bespoke Intervention 0% £0 £0
People & Skills Insert Bespoke Intervention 0% £0 £0
People & Skills Insert Bespoke Intervention 0% £0 £0
People & Skills P&S Bespoke Interventions Total £0 0% £0 £0 £0 £0 £0 £0 £0 £0 £0 £0 £0
People & Skills People & Skills Intervention Total £1,328,175 35% £240,489 £276,872 £747,878 £1,265,239 £15,940 £224,549 £12,708 £264,164 £12,808 £735,070 £1,265,239
Multiply S42: Courses designed to increase confidence with numbers 0% £0 £0
Multiply S43: Courses for parents wanting to increase numeracy skills 0% £0 £0
Multiply S44: Courses for prisoners, those recently released or on temporary licence 0% £0 £0
Multiply S45: Courses aimed at encouraging people to upskill to access jobs/careers 0% £0 £0
Multiply S46: Additional relevant maths modules in vocational courses 0% £0 £0
Multiply S47: Innovative programmes delivered with employers 0% £0 £0
Multiply S48: Intensive& flexible courses targetted at those without Level 5 maths 0% £0 £0
Multiply S49: Courses designed to help people use numeracy to manage money 0% £0 £0
Multiply S50: Courses for 19s or over leaving or just left the care system 0% £0 £0
Multiply S51: Provision developed in partnership with community organisations 0% £0 £0
Multiply Total for 'On-menu' Interventions £0 0% £0 £0 £0 £0 £0 £0 £0 £0 £0 £0 £0
Multiply Insert Bespoke Intervention 0% £0 £0
Multiply Insert Bespoke Intervention 0% £0 £0
Multiply Insert Bespoke Intervention 0% £0 £0
Multiply Insert Bespoke Intervention 0% £0 £0
Multiply Insert Bespoke Intervention 0% £0 £0
Multiply Multiply Bespoke Interventions Total £0 0% £0 £0 £0 £0 £0 £0 £0 £0 £0 £0 £0
Multiply Multiply Interventions Total £0 0% £0 £0 £0 £0 £0 £0 £0 £0 £0 £0 £0
£3,750,124 100% £433,289 £866,580 £2,342,436 £3,642,305 £45,940 £385,349 £113,836 £752,744 £421,142 £1,849,294 £3,568,305Allocation Totals
UKSPF Allocation Annual Expenditure UKSPF Allocation Capital/Revenue Split (£)
The table below should be completed by intervention. Enter the amount of the UKSPF allocation you are assigning to each intervention in column C then provide an annual expenditure profile within columns E
to G for each Financial Year. Capital and revenue amounts (£) should be entered for each intervention by financial year in columns I to N  (please see minimum capital % for each financial year in the guidance
to support your calculations). Interventions must be completed by March 2025 as detailed in Section 7 of the Prospectus.
Table B - Expenditure Profile
Page 234

Page 235

Communities & Place C&P Bespoke C&P Totals Local Businesses LB   Bespoke LB Totals People & Skills P&S   Bespoke P&S Totals Multiply Multiply Bespoke Multiply Totals £ Fund Total % Fund
Total Cap% Rev% Cap% Rev% Cap% Rev% Cap% Rev%
1 £97,000 £0 £97,000 £95,800 £0 £95,800 £240,489 £0 £240,489 £0 £0 £0 £433,289 12% 20.62% 77.32% 10.44% 89.56% 6.63% 93.37% 10.60% 88.94%
2 £228,234 £0 £228,234 £361,474 £0 £361,474 £276,872 £0 £276,872 £0 £0 £0 £866,580 24% 31.70% 68.30% 7.96% 92.04% 4.59% 95.41% 13.14% 86.86%
3 £901,778 £0 £901,778 £692,780 £0 £692,780 £747,878 £0 £747,878 £0 £0 £0 £2,342,436 64% 29.49% 62.53% 20.56% 79.44% 1.71% 98.29% 17.98% 78.95%
£3,642,305 100%
For Internal Use Only
LB Revenue/Capital
P&S
Revenue/Capital
Total
Revenue/Capital
£1,265,239 £0
Excluding Multiply
2023/24
2024/25
IP Totals £1,227,012 £1,150,054
Funding Period:
2022/23
Allocation
Summary UKSPF Allocation Total Expenditure by Investment Priority
C&P
Revenue/Capital
Table C - Allocation Summary
Page 235

Page 236

This page is intentionally left blank

Page 237

Appendix D: Indicative Outputs and Impacts – as of 2nd August 2022 
Table D1: Indicative Outputs (subject to revision)
Intervention number and measure  Number
S7 Number of organisations receiving financial support other than grants 1
S7 Number of organisations receiving grants 1
S7 Number of organisations receiving non-financial support  3000
S7 Number of people reached 1,200,000
S8 Number of local events or activities supported 40
S8 Number of organisations receiving grants 30
S8 Number of projects successfully completed 35
S8 Number of volunteering opportunities supported 50
S9 Amount of green or blue space created or improved 150
S9 Number of amenities/facilities created or improved 4
S9 Number of organisations receiving financial support other than grants 6
S9 Number of organisations receiving grants 6
S9 Number of organisations receiving non-financial support  4
S9 Number of people attending training sessions 40
S9 Number of Tourism, Culture or Heritage assets created or improved 9
S10 Number of households receiving support 750
S10 Number of households supported to take up energy efficiency measures 500
S10 Number of organisations receiving financial support other than grants 1
S10 Number of people reached 1,500
S12 Number of facilities supported/created 2
S12 Number of organisations receiving non-financial support  10
S13 Number of organisations receiving financial support other than grants 7
S13 Number of organisations receiving non-financial support  7
S13 Number of people supported to gain employment  10
S14 Number of organisations receiving financial support other than grants 1
S15 Number of enterprises receiving non - financial support  85
S15 Number of people attending training sessions  960
S16 Number of enterprises receiving non-financial support 15
S22 Number of enterprises receiving non-financial support 4
S26 Number of enterprises receiving grants 21
S29 Number of enterprises receiving grants 58
S29 Number of enterprises receiving non-financial support 60
S29 Number of potential entrepreneurs assisted to be business ready 20
S31 Number of economically inactive people engaging with keyworker support
services
150
S31 Number of effective engagements between keyworkers and additional services  1248
S31 Number of people receiving support to gain employment  127
S31 Number of people receiving support to sustain employment  40
S31 Number of people supported to access basic skills courses 108
S31 Number of people supported to engage in job searching 187
S31 Number of socially excluded people accessing support  54
Page 237

Page 238

S33 Number of people supported to participate in education  4,030
S33 Number of people taking part in work experience programmes  70
S33 Number of volunteering opportunities supported 550
S35 Number of people in employment engaging with the skills system 70
S35 Number of people retraining 75
S35 Number of people supported to gain a qualification or complete a course 170 
Table D2: Indicative outcomes (subject to revision)
Intervention number and measure Number
S8 Number of volunteering opportunities created as a result of support  70
S9 Improved engagement numbers (% increase) 5
S10 Increased take-up of energy efficiency measures (% increase)  2
S12 Improved perception of facility/infrastructure (% increase) 2
S12 Number of premises with improved digital connectivity 2
S13 Number of people in employment, including self-employment, following support 10
S15 Number of enterprises adopting new to the firm technologies or processes  60
S15 Number of organisations engaged in new knowledge transfer activity  60
S22  Jobs created as a result of support 4
S26  Jobs created as a result of support 21
S29 Number of new enterprises created as a result of support 20
S31 Number of economically inactive people accessing benefits they are entitled to
following support 
130
S31 Number of people engaging with mainstream healthcare services  111
S31 Number of people in employment, including self-employment following support  127
S31 Number of people in supported employment 40
S31 Number of people reporting increased employability through development of
interpersonal skills funded by UKSPF 
122
S31 Number of people sustaining engagement with keyworker support and additional
services
130
S31 Number of people with basic skills following support 25
S33 Number of people experiencing reduced structural barriers into employment and
into skills provision 
4,060
S33 Number of people familiarised with employers’ expectations, including, standards
of behaviour in the workplace 
130
S33 Number of people in education/training following support 20
S33 Number of people in employment, including self-employment following support  60
S35 Number of people in education/training following support 85
S35 Number of people in employment, including self-employment following support  130
S35 People gaining a qualification or completing a course following support 100 
Subject to revision. 
Officer verbal update to be provided, as appropriate, at the Policy & Resources Committee meeting. 
Page 238

Page 239

ARGYLL AND BUTE COUNCIL      POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND 
ECONOMIC GROWTH          11 AUGUST 2022 
PLACE BASED INVESTMENT AND CROWN ESTATE FUND 2022/23 –
REMAINING FUNDING ALLOCATIONS AND POSSIBLE PROJECTS 
1.0 EXECUTIVE SUMMARY  
1.1 As members will recall Argyll and Bute Council has been allocated £712,000
for financial year 2022/23 from Scottish Government, via its Place Based
Investment (PBI) Programme. At the meeting of the Policy and Resources
Committee on 16 May members agreed to allocate £322,486 of the PBI
funding to some initial projects.  The purpose of this report is to seek
members’ consideration of the reminder of the £322,486 unallocated PBI
funding for 2022/23.   
1.2 The report also asks members to give consideration to the unallocated Crown
Estate (CE) funding for 2022/23. As with the PBI funding allocation the Policy
and Resources Committee on 16 May also agreed to allocate CE to a number
of initial projects. This means that, based on the prudent estimate of £1.0m of
anticipated funding in 2022/23, and taking into account the allocation also
agreed at February Council, there remains £397,453 available to be allocated
by members. 
1.3 This report provides the basic criteria that needs to be considered and
adhered to when determining which potential projects could be supported via
the PBI and CE allocation for 2022/23. In addition to the criteria itself the PBI
funding for 2022/23 must be committed by 31st March 2023 and be evidenced
by, at minimum, a fully let contract or commencement of works in order to
avoid having to return any unspent funds to Scottish Government. 
1.4 In order to advance this process it is proposed that the Executive Director with
responsibility for Development and Economic Growth seeks suggestions for
potential projects which would fit within the funds criteria and timeline from all
Elected Members.  It is also proposed that a delegation is given to the
Executive Director with responsibility for Development and Economic Growth,
in consultation with the Leader, Depute Leader, and Leader of the largest
Opposition Group to agree the expenditure on projects that fit best for the
2022/23 allocation.   
Page 239 Agenda Item 9

Page 240

1.5 The suggestion is that the focus of the projects for 2022/23 should be in
respect of those existing projects that are well advanced, relate to Council
assets or to third party projects we are currently working closely with and
there is a time constraint associated with them and they can be readily taken
forward to meet the PBI and CE timelines, and for the added value that they
can offer to our communities. 
1.6 It is worth noting that in addition to this year’s allocation for PBI, the Scottish
Government has committed to continuing to provide local authorities with
funding from its PBI Programme on an annual basis for the next 3 financial
years. Although the annual share for Argyll and Bute in subsequent years is
yet to be fully determined, it is likely to be of a level that could deliver a
number of key projects, and which could meaningfully support the economic
recovery of the area. In addition the CE funding is also likely to be available in
subsequent years. 
1.7 Depending on the response and suggestions from members the fact that
there will be funding available in subsequent years for both PBI and CE, could
allow any projects that meet with the criteria but cannot be delivered within
this year’s allocation timeframe or were not an immediate priority, to be put
forward for consideration as part of future year’s allocations. Although it
should be borne in mind that if LUF bid were to be successful that some PBI
and CE funding has been put forward as match and would need to be set
aside. 
RECOMMENDATIONS 
It is recommended that Policy and Resources Committee agree: 
a) That the Executive Director with responsibility for Development and Economic
Growth seeks suggestions for potential projects that would fit with the funds
criteria and timeline from all Elected Members.  
b) That delegated authority be given to the Executive Director with responsibility
for Development and Economic Growth, in consultation with the Leader and
Depute Leader of the Council, and Leader of the largest Opposition Group to
agree expenditure on the projects that fit best for the 2022/23 allocation,
following receipt of any suggestions.   
Page 240

Page 241

ARGYLL AND BUTE COUNCIL      POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND 
ECONOMIC GROWTH         11 AUGUST 2022 
PLACE BASED INVESTMENT AND CROWN ESTATE FUND 2022/23 –
REMAINING FUNDING ALLOCATION AND POSSIBLE PROJECTS 
2.0 INTRODUCTION 
2.1 The council has been allocated £712,000 from Scottish Government for
financial year 2022/23 for capital ‘place’ regeneration projects. At the meeting
of the Policy and Resources Committee on 16 May members agree to allocate
£322,486 of the PBI funding to some initial projects.  The purpose of this
report is to seek member’s consideration of the reminder of the £322,486
unallocated PBI funding for 2022/23 taking into account the PBI criteria as set
by Scottish Government and the associated timeline for spend and resource
implication.  As part of the annual reporting requirements for this fund, the
Council has to advise how the funding has been spent across the categories.   
2.2      The report also asks members to give consideration to the unallocated Crown
Estate (CE) funding for 2022/23. As with the PBI funding allocation, the May
Policy and Resources Committee also agreed to allocate CE to a number of
initial projects. This means that, based on the prudent estimate of £1.0m of
anticipated funding in 2022/23, and taking into account the allocation also
agreed at February Council, there remains £397,453 available to be allocated
by members. As with the PBI funding, as part of the annual reporting
requirements for this fund, the Council has to advise how the funding has
been spent across the categories.       
2.3      Any projects proposed would need to be considered to fit strongly with the
PBI and CE criteria, deliver on the Council’s Economic Recovery Strategy, are
time critical, add value to investment that has already been made by the
Council, deliver on our regeneration outcomes for our places, take account of
available officer resources and take account of the relatively tight timeline that
we need to meet to align with the funding. 
3.0 RECOMMENDATIONS 
3.1     It is recommended that Policy and Resources Committee agree: 
Page 241

Page 242

a) That the Executive Director with responsibility for Development and Economic
Growth seeks suggestions for potential projects that would fit with the funds
criteria and timeline from all Elected Members.  
b) That delegated authority be given to the Executive Director with responsibility
for Development and Economic Growth, in consultation with the Leader and
Depute Leader of the Council, and Leader of the largest Opposition Group to
agree expenditure on the projects that fit best for the 2022/23 allocation,
following receipt of any suggestions.   
4.0 DETAIL 
4.1 The 2020 Programme for Government committed to establishing a Place
Based Investment Programme (PBIP), linking and aligning place-based
funding initiatives. Scottish Government confirmed that Local Government
would be receiving a share of the PBIP funding over a 5 year period, including
the initial year 2021/22, to support and advance place-based investment and
build on the strong partnership currently existing through the Regeneration
Capital Grant Fund.  As has been the case this year, Argyll and Bute Council
will receive a share of this capital funding over the subsequent 3 years. 
4.2 Information has been provided below to assist members when considering
which project suggestions would best fit with the PBI programme in regard to
allocating the reminder of the £322,486 PBI funding for 2022/23. It may also
be helpful at this stage for members to be aware of a number of projects that
officers are currently working on that may require additional funding this
financial year. These include Gibraltar Street public realm projects in Oban,
tender process to commence in the next two months, Dunoon Burgh Hall
project, this is currently being tendered by the Trust, Rockfield Outdoor space
Community Wellbeing Hub and outdoor public green space and also worth
noting that we are still awaiting the decision regarding the Islands Programme
submissions. 
4.3 The main objectives of the PBIP are:  
 to link and align place-based initiatives, and establish a coherent local
framework to implement the Place Principle; 
 to support place policy ambitions such as town centre revitalisation,
community led regeneration, 20 minute neighbourhoods and Community
Wealth Building; 
 to ensure that all place-based investments are shaped by the needs and
aspirations of local communities; and,
 to accelerate our ambitions for net zero, wellbeing and inclusive economic
development, tackling inequality and disadvantage, community involvement
and ownership. 
4.4     In regard to PBI funding can only be used for capital regeneration projects,
Page 242

Page 243

and projects must aim to: 
 link and align to place-based initiatives, and establish a coherent local
framework to implement the Place Principle; 
 support place policy ambitions, such as town centre revitalisation, community-
led regeneration, 20 minute neighbourhoods and Community Wealth Building;  
 ensure that all place-based investments are shaped by the needs and
aspirations of local communities; and,
 accelerate net zero ambitions, wellbeing and inclusive economic
development, tackling inequality and disadvantage, community involvement
and ownership. 
4.5 The funding for 2022/23 must be committed by 31st March 2023 and be
evidenced by at minimum a fully let contract or commencement of works in
order to avoid having to return any unspent funds to Scottish Government.
This means that there is not much time to ensure that we meet with this
timeframe are projects not only have to have the ability to meet the aims of
the fund, but add value to existing pieces of work and are time critical. 
4.6 The fund links closely to the ongoing reprioritisation focus of the Economic
Growth service, and associated Economic Strategy and Economic Recovery
Plan. With its ‘place’ focus, the fund also builds on and adds value to the
previous year’s PBI funding as well as previous Town Centre Fund
investment, as well as previous regeneration initiatives taken forward by the
council. 
4.7     The Crown Estate funding is targeted at the sustainability of coastal
communities within the following categories:
            Environment
            Community
            Climate Change
            Economic Development.                   
As part of the annual reporting requirements for this fund, the Council has to
advise how the funding has been spent across the categories.   
4.8 The challenge in respect of the fund is to identify projects that meet the PBI
and CE criteria, and are able to be delivered within short timeframes with our
limited staff resources. Projects to be delivered under the 2022/23 allocation
need to be delivered in a 7 month period and therefore need to be sufficiently
well advanced in terms of their development, straightforward to deliver and/or
be ready to start on site, or be able to be delivered by a third party. 
4.9 Under the PBI allocation for 2021/22 the council supported a total of 8
projects and prior to the commencement of PBI funding the council supported
a total of 28 projects under the previous SG Town Centre Funding stream.  As
a number of those projects being supported through the previous year’s
allocation are ongoing, the key issue has and continues to be the availability
of internal resources to develop and deliver new projects. 
Page 243

Page 244

4.10 As with last year’s PBI funding the focus for this year’s PBI fund has to be on
projects that are at delivery stage, and can definitely be delivered within the
tight timeframe. The projects need to fit with the PBI criteria, have the ability to
build on previous investments, and require the resources to be in place to
ensure delivery within the timescales required by the Scottish Government.
Ideally for this year’s funding the focus should be on existing projects that are
well advanced, relate to council assets or to third party projects we are
currently working closely with and there is a time constraint associated with
them and they can be readily taken forward to meet the PBI and CE timelines,
and for the added value that they can offer to our communities. 
5.0      CONCLUSION 
5.1 The relatively tight timescales associated with both of these funds, but more
specifically the PBI fund, combined with the large number of existing projects
being delivered by the council, make for a challenging place based investment
programme. Any suggested projects should be focused on those that are time
critical and fit well with the net zero ambitions of the Council and Government
together with the 20 minute neighbourhood/wellbeing context and build on
investment already in place, or projects identified through existing Place based
work. 
5.2     In addition to this year’s allocation, the Scottish Government has committed to
continuing to provide local authorities with funding from its Place Based
Investment Programme on an annual basis for the next 3 financial years.
Although the annual share for Argyll and Bute in subsequent years is yet to be
fully determined, it is likely to be of a level that could support the delivery of a
number of key projects, and which could meaningfully support the economic
recovery of the area. 
5.3      In addition to the PBI funding the CE funding is also likely to be available in
subsequent years. Depending on the response and suggestions from
members the fact that there will be funding available in subsequent years for
both PBI and CE, could allow any project suggestions that meet with the
criteria but cannot be delivered within this year’s allocation timeframe or were
not an immediate priority, to be put forward for consideration as part of future
year’s allocations. Although it should be borne in mind that if the Regeneration
Levelling Up Fund bid were to be successful that some PBI and CE future
year funding has been put forward as match and would need to be set aside
in subsequent years. 
6.0 IMPLICATIONS 
6.1 Policy – There is a need to comply with the Scottish Government ‘place’ policies
as outlined in paragraph 4.3 and associated guidance for the Fund as well as
the Crown Estate fund guidance outlines in paragraph 1.7 
6.2 Financial – The Scottish Government expect that any uncommitted PBI funds
by 1st April 2023 will be returned to Scottish Government.
Page 244

Page 245

6.3  Legal – None 
6.4  HR – Resourced from existing staff 
6.5  Fairer Scotland Duty:
6.5.1   Equalities - protected characteristics - None
6.5.2   Socio-economic Duty – The Fund will support local economies through place-
based centre regeneration activity.
6.5.3 Islands – The Fund will support island economies through place-based
regeneration activity and has the potential to align with, and add value to, the
Islands Infrastructure Investment Fund. 
6.6. Risk – In order for each PBI project to progress to delivery stage, a fully let
contract must be in place by 31st March 2023. The projects will be continually
monitored to ensure that funds can be reallocated to another Place Based
Investment Fund project to avoid having to return any uncommitted funds to
Scottish Government at this time. 
6.7  Climate Change – the projects deliver towards net zero and address Argyll and
Bute’s carbon footprint.   
6.8  Customer Service - None 
Executive Director with responsibility for Development and Economic Growth:
Kirsty Flanagan 
Policy Lead for Economy and Rural Growth: Councillor Robin Currie   
21 July 2022                                                 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Audrey Martin Transformational Projects and Regeneration Manager 
Audrey.Martin@argyll-bute.gov.uk     
Page 245

Page 246

This page is intentionally left blank

Page 247

ARGYLL AND BUTE COUNCIL              POLICY & RESOURCES COMMITTEE
CLIMATE CHANGE BOARD               11th August 2022 
____________________________________________________________________________
COUNCIL CARBON EMISSIONS & CLIMATE INVESTMENT 2022 
1.0 EXECUTIVE SUMMARY 
1.1 Scotland has some of the most ambitious targets and progressive legislation in
terms of climate change in the world and the public sector is being promoted as
playing a leading role towards achieving net zero by 2045.  As with other public
bodies it has been a requirement for Argyll & Bute Council to monitor, record and
publish contributing factors towards climate change for the past 6 years.  The most
recent results from the national ‘Reporting Requirements’ has recently been
published in April 2022 and covers the previous financial year for 2020/21.   
1.2 Around 160 public bodies (Councils, Health Boards, Government) published data
in the past year and across Scotland there was a general downward trend in carbon
emissions across the board – some of it will be attributable to impact of COVID19
pandemic where certain sectors like travel and construction were less active for part
of the year but other factors include the general de-carbonisation of the national
grid as we transition away from fossil fuels for generation of electricity.     
1.3 Argyll & Bute Council saw our carbon emissions generated by our business
activities drop for the fourth year in a row.  Our carbon footprint has reduced from
28,643 tCO2e (tonnes of carbon dioxide equivalent) in 2019/20 to 26,619 tCO2e in
2020/21.  This means around a 33% (third) reduction in emissions since
recording commenced in 2015/16.  There are a number of factors that have
contributed to this reduction such as direct interventions to make buildings more
energy & heat efficient, replacing traditional lightbulbs with LED, moving to electric
or hybrid vehicles and treating municipal waste in different ways.  The overall
national grid becoming more reliant upon renewable energy sources (over fossil
fuel) has also had a material impact.  This reduction over this period is in line with
the national average.   
1.4 Our Climate Change Board have overall responsibility for the ‘reporting
requirements’ submission and continue to develop new ways to reduce the
Council’s Carbon Footprint.   Our Council also adopted its second De-Carbonisation
Plan in December 2021 to recognise the importance of setting out a plan to achieve
net zero by 2045.  There are also ambitious interim targets of reaching a 75%
reduction by 2030 which is only 8 years away.  It is recognised that whilst there may
be some rapid progression to reduce emissions in early years some of the more
stubborn and difficult sectors like waste, travel or heating will require whole systems
changes and change in cultural behaviour to achieve them.   
1.5 The Council in its February 2022 Budget also allocated additional funding of
£500,000, building on previous £1.1m investments, for climate change, including
projects within Argyll and Bute’s schools. This report outlines some of the projects
Page 247 Agenda Item 10a

Page 248

this funding will be allocated to.   
2.0    RECOMMENDATIONS
2.1 That the Policy & Resources Committee consider and agree the following:
2.1.1 Note the publication of the Council’s 2020/21 carbon emissions report and its
continued positive trend highlighting that carbon dioxide equivalent emissions
have reduced by 33% in past 6 years; and,
2.1.2 Note the climate change projects that will be developed in 2022 onwards that
are aligned to the additional £500,000 commitment that was allocated at the
February 2022 Council Budget.   
2.1.3 Agree to the inclusion of the Policy Lead with responsibility for Climate Change
as a member of the Climate Change Board.  
Page 248

Page 249

ARGYLL AND BUTE COUNCIL              POLICY & RESOURCES COMMITTEE
CLIMATE CHANGE BOARD               11th August 2022     
COUNCIL CARBON EMISSIONS & CLIMATE INVESTMENT 2022 
3.0 INTRODUCTION 
3.1 The Climate Change (Duties of Public Bodies: Reporting Requirements) (Scotland)
Order 2015 requires the 180 public bodies classified as major players to prepare an
annual “Report on Compliance with Climate Change Duties” (Schedule 2).  Argyll
and Bute Council is one of these organisations required to publish annual emissions
since 2015.  The most recent publication has been released in April 2022 for the
reporting period 2020/21.   
3.2 The Climate Change Board report progress to the Policy and Resources Committee
on a regular basis. This is the first report outlining activities of the Climate Change
Board to the new Council and is useful to provide a baseline snapshot of what are
the key contributors to Council emissions plus also successes and areas for
improvement.  The carbon footprint of the Council also aligns to De-Carbonisation
Plan which was adopted by the Council in 2021 which starts to provide a routemap
towards net zero by 2045.  It should be noted that the reporting requirements solely
record the emissions of the Council as a business and do not reflect overall or
regional emissions like local industry, private sector, personal travel etc.  As
reported elsewhere, as a region, Argyll and Bute has one of the most favourable
regional carbon footprints due to large land mass, high forest cover, low number of
industrial polluters and low population. 
3.3 All members of the Climate Change Board are asked at monthly meetings if reports
are to be escalated to Policy & Resources Committee so content should be varied
across various departments.  Certain reports such as the De-carbonisation Tracker
and annual carbon emissions report (this report) will be consistent features.  It is
also recommended that the Policy Lead with responsibility for Climate Change is
invited to be a member of the Climate Change Board to ensure a seamless link with
regards to strategic leadership and operational delivery. 
4.0       RECOMMENDATIONS
That the Policy & Resources Committee consider and agree the following:
4.1.1 Note the publication of the Council’s 2020/21 carbon emissions report and its
continued positive trend highlighting that carbon dioxide equivalent emissions have
reduced by 33% in past 6 years; and,
4.1.2 Note the climate change projects that will be developed in 2022 onwards that are
aligned to the additional £500,000 commitment that was allocated at the February
2022 Council Budget; and,
4.1.3 Agree to the inclusion of the Policy Lead with responsibility for Climate Change as a
Page 249

Page 250

member of the Climate Change Board. 
5.0     BACKGROUND 
5.1 Since 2015/16 Argyll & Bute Council has published data on its Carbon Emissions
annually based on a nationally agreed framework of indicators.  There has been
an evolution of indicators over the years but most have stayed consistent so a
general trend has been able to be formed as outlined in the table below.  It should
be noted that not all activities produce direct greenhouse gas emissions, however
for the purposes of reporting activities are given a ‘tons of carbon dioxide
equivalent’ rating so they can be more easily compared. This is industry standard
approach.   
Table 1- Annual Emissions with Baseline   
Reference
Year
Year Scope1 Scope2 Scope3 Total Units Comments
Baseline
carbon
footprint
2015/16 10767.7 11701.3 16995 39464 tCO2e 
Year 1
carbon
footprint
2016/17 9146.4 9790.3 16593.8 35531 tCO2e  
Year 2
carbon
footprint
2017/18 9437.6 7797.8 19569.4 36805 tCO2e Municipal waste
to landfill is the
Council's largest
contributor to its
carbon footprint;
despite a
reduction in
municipal waste
to landfill, the
significant
increase in the
relevant carbon
emissions factor
has caused an
upturn in scope
3 emissions.
Year 3
carbon
footprint
2018/19 8937.4 5862.49 19938.13 34,738 tCO2e This represents
a 12% reduction
in 3 years 
Year 4
Carbon
Footprint
2019/20 8849 4687 15107 28643 tCO2e 
Year 5
Carbon
Footprint
2020/21 8611  4178 13830 26619 tCO2e 
Page 250

Page 251

5.2 There is a positive (downward) trend across the Council as highlighted below. 
Graph 1 – Annual Carbon Emissions 
5.3 All activity of the Council is monitored so it is important to understand the
breakdown of emission sources.  All departments have a responsibility and role
to play in monitoring and reducing carbon emissions.   
Table 2 -  Breakdown of emission sources 
Emission Source Emissions (tCO2e) Comments
Refuse Municipal to Landfill 12,798 ~48% of total carbon
footprint
Grid Electricity  3,655 ~14% of total carbon
footprint
Natural Gas 4,042 ~15% of total carbon
footprint – mainly used as
heating source in buildings
Fleet – all Diesel Vehicles 2,554 ~10% of total carbon
footprint – bin lorries, cars,
vans
Gas Oil & LPG 2016 ~8% of total carbon footprint
– mainly for building heating
Business Miles (unspecified
fuel)
274 ~1% of total carbon footprint 
Streetlighting 882 ~3% of total carbon footprint
39464
35531
36805
34738
28643
26619
20000
22000
24000
26000
28000
30000
32000
34000
36000
38000
40000
2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
tCO2e
Year
Council Carbon Footprint
Page 251

Page 252

All other activities  399 ~1 % of total carbon
footprint includes collections
for recycling, water
treatment, tyre processing,
glass / WEE recycling 
Graph 2 – Breakdown of emission sources 
5.4 The relative sources of emissions by activity have remained fairly consistent for
several years with processing municipal waste being responsible for around
half of the entire emissions.  Whilst overall all emission sources have reduced
the proportions have remained relatively consistent.  Future projects like
Biodegradable Municipal Waste (BMW) Landfill Ban, switching to greener ways
heat and power buildings and fleet replacement with low emissions vehicles will
obviously have a significant impact on overall carbon footprint. 
5.5 The Council have also invested in generating own sources of renewable heat
and energy as outlined this year below:- 
Table 3 - Generation, consumption and export of renewable energy 
Renewable Electricity  Renewable Heat
TECHNOLOGY Total consumed
by the
organisation
(kWh)
Total exported
(kWh)
Total consumed
by the
organisation
(kWh)
Total exported
(kWh)
48%
14%
15%
10%
8%
1%
3%
1%
Argyll & Bute Breakdown of Emissions 2020/2021
Refuse Municipal to Landfill -  48%
Grid Electricity - 14%
Natural Gas -15%
Fleet - all Diesel Vehicles -10%
Gas Oil & LPG - 8%
Business Miles (unspecified fuel) -1%
Streetlighting -3%
All other activities - 1%
Page 252

Page 253

Solar PV 882843 0    
Wind 15000 135000    
Biomass     4678800 0
Air Source Heat Pump     130000 0   
Graph 3 – Benchmarking of Council Carbon Emissions 
5.6 The graph above highlights Argyll and Bute Council’s carbon emissions in
relation to other local authorities who have published their 2020/21 data at this
point.  It is very difficult to make a direct comparison as population, physical
size, internal processes (particularly waste treatment) and geographic factors
all have a material impact on overall emissions.   
6.0     Climate Change Projects 2022 
6.1 The Council Budget which was approved in February 2022 included a provision
for:- 
Additional funding of £0.5m, building on previous £1.1m investments, for
climate change, including projects within Argyll and Bute’s schools. 
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
Aberdeenshire Council
Aberdeen City Council
Angus Council
Argyll and Bute Council
City of Edinburgh
Clackmannanshire Council
Comhairle nan Eileen Siar
Dumfries and Galloway Council
Dundee City Council
East Ayrshire Council
East Dunbartonshire Council
East Lothian Council
East Renfrewshire Council
Falkirk Council
Fife Council
Glasgow
City Council
Highland Council
Inverclyde Council
Midlothian Council
Moray Council
North Ayrshire Council
North Lanarkshire Council
Orkney Islands Council
Perth and Kinross Council
Renfrewshire Council
Scottish Borders Council
Shetland Islands Council
South Ayrshire Council
South Lanarkshire Council
Stirling Council
W
est Dunbartonshire Council
W
est Lothian Council
tCO2e
Climate Change Reporting Year 2020 -21
tCO2e Reporting Year 2020 2021 Scottish Average
Page 253

Page 254

6.2 In light of this additional investment and following discussions with the Climate
Change Board it is proposed the following projects are pursued to further
enhance our position:- 
1. Non Domestic Energy Efficiency Framework (NDEEF)2. - £350,000 
This is the funding framework that has been used in previous years to invest
£1.5m of new greener more efficient property projects through energy transition
and sustainable practices.  Currently 18 unfunded projects at initial case
selection.  Projects will be developed and investment business cases taken to
point of commitment in 2022/23.  Due to most sites being on Education estate
most will await school holidays for actual installation (some of them in 2023/24)
to deliver.  Contracts would be signed / committed in 2022/23 year.  A list of
projects that will be considered for Business Case will be:- 
PLEASE NOTE NOT ALL OF THESE PROJECTS WILL BE ABLE TO
PROCEED WITH THIS BUDGET & ALL WILL BE SUBJECT TO BUSINESS
CASE.  THIS IS SCOPING LIST THAT WILL BE REFINED DEPENDING ON
THE BUSINESS CASE ANALYSIS 
SITE
CLIMATE CHANGE / ENERGY
EFFICIENT TECHNOLOGY
Carradale Primary School
LED Lighting, Solar PV, BMS
Optimisation, Heating Optimisation
Hermitage Academy
LED Lighting, BMS Optimisation, Heating
Optimisation
Lochgilphead Joint Campus
LED Lighting, BMS Optimisation, Heating
Optimisation
Oban High School
LED Lighting, Solar PV, BMS
Optimisation, Heating Optimisation
Dunoon Grammar School
LED Lighting, BMS Optimisation, Heating
Optimisation
Rothesay Joint Campus
LED Lighting, BMS Optimisation, Heating
Optimisation
Cardross Primary School
LED Lighting, Solar PV, New Boiler
System, BMS Optimisation
Lismore Primary School LED Lighting, ASHP, BMS Optimisation
Kirn Primary School
LED Lighting, Solar PV, BMS
Optimisation, Heating Optimisation
Oban Joint Primary Campus
LED Lighting, BMS Optimisation, Heating
Optimisation
Campbeltown Grammar School
LED Lighting, Solar PV, BMS
Optimisation, Heating Optimisation
Tighnabruaich Primary School LED Lighting, ASHP, BMS Optimisation
Port Ellen Primary School LED Lighting, ASHP, BMS Optimisation
Lorn Resource Centre ASHP, BMS Optimisation
Easdale Primary School ASHP, BMS Optimisation
Keills Primary School LED Lighting, ASHP, BMS Optimisation
Dalmally Primary School LED Lighting, ASHP, BMS Optimisation
Page 254

Page 255

Blackhill Depot Solar PV 
LED- light emitting diode (energy efficient lighting)
ASHP - Air Source Heat Pump (low carbon heating)
BMS - Building management system 
2. Evidence based routemap to net zero - £50,000 consultancy support 
Requirement to comply with the Climate Change (Duties of Public Bodies:
Reporting Requirements) (Scotland) Amendment Order 2020 
 New legislation that comes into effect in late 2022 which requires specific
and scientific routemapping towards reaching net zero targets and model
emissions based on activity.  This will be for waste, roads, commercial
services, airports etc
 Routemaps to Netzero require alignment to Council spending plans and
need to be submitted in Nov 2022
 £50,000 for consultancy support to deliver this (will be a cost pressure
otherwise).  Output will be compliant and evidence based routemap to
net zero for the Council. 
To be taken forward in partnership with HIE, Western Isles Council & Hub North. 
3. Local Heat and Energy Efficiency Strategy  (LHEES) - £50,000 consultancy
support 
The Local Heat and Energy Efficiency Strategies (Scotland) Order was developed
in partnership with COSLA and laid in the Scottish Parliament on 11 March
2022.  It places a duty on local authorities to produce Strategies and Delivery Plans
on a 5 year cycle, with the first iteration due to be published by the end of 2023.  In
support of this duty, the Scottish Government is providing £2.4m of annual revenue
funding, ABC share £75,000, confirmed at the end of May 2022.  This is to allow
each local authority to recruit 1 FTE post to focus of coordination of LHEES, with a
further £25,000 per council per annum to procure or internally resource technically
support.    Officers will bring an update on progress in due course. If it is
considered after analysis this funding is not required then the £50,000 will be
retained for other activities outlined in this paper.   
4. Regional support of Climate Action Project Manager within Community
Planning Partnership (CPP) - £50,000 of part funded post 
The Argyll and Bute Community Planning Partnership (CPP) and the Adaptation
Scotland programme has identified a clear need for an initiative for Argyll and Bute
to make a thorough and strategic approach for action to combat Climate Change. 
This is a regional approach to address climate issues – not solely on Council
related business.  This requires a high degree of partnership and joint working from
variety of stakeholders across the public, private and third sector to succeed as 1
grouping in isolation cannot address the cause and effect of climate change.   
The CPP Management Committee has appointed a sub group to review and set
actions in partnership relating to climate change and one of their principle
Page 255

Page 256

recommendations is to appoint a jointly funded Climate Action Project Manager
post that will act in the interest of all CPP partners.  Some partners such as NHS
Highland have already committed funding to the creation of this new post which
initially will be temporary for 3 years.  The main activities of this new post will be to
set up and a new regional Argyll and Bute Climate Action plan, a collaborative
stakeholder approach to mitigating against and adapting to climate change with a
strong focus on community involvement.   
The proposal is allocate £50,000 of funding from this budget to act as the Council’s
contribution to this new CPP post.   
7.0     Conclusions 
7.1 It is a requirement to publish annual carbon emissions for the Scottish Government. 
This report highlights our overall emissions for most recent period 2020/21 and
outlines that changes to this process will be forthcoming in future months due to
change in The Climate Change (Duties of Public Bodies: Reporting Requirements)
(Scotland) Amendment Order 2020. It also seeks to invite the Policy Lead with
responsibility for Climate Change to be a member of the Climate Change Board to
ensure a seamless link with regards to strategic leadership and operational delivery. 
8.  IMPLICATIONS
8.1 Policy – underpins commitment to addressing Climate Change.
8.2 Financial – Paper reports on downward trend of emissions and can be linked to
greater efficiency of ongoing utility costs.  Proposed expenditure of allocated
climate change funding from 2022 Budget.  
8.3 Legal – Meeting requirements of climate change Scotland act.  
8.4 HR – None 
8.5 Fairer Scotland Duty 
8.5.1 Equalities – Protected characteristics – None
8.5.2 Socio economic Duty – None
8.5.3 Islands – None
8.6 Climate change – Direct link confirming downward trend in emissions and
proposed future projects that will address climate change.  
8.7 Risk – Not addressing impacts or causes of climate change can lead to
increased cost or censure if targets are not met.  
8.8 Customer Service – None.
Douglas Hendry, Executive Director with responsibility for Commercial Services
Page 256

Page 257

Councillor Ross Moreland – Policy Lead Climate Change & Environment 
14th July 2022 
For further information contact: 
Ross McLaughlin
Head of Commercial Services 
The Helensburgh and Lomond Civic Centre
ross.mclaughlin@argyll-bute.gov.uk 
Page 257

Page 258

This page is intentionally left blank

Page 259

ARGYLL AND BUTE COUNCIL              POLICY & RESOURCES COMMITTEE
CLIMATE CHANGE BOARD               11th August 2022     
DE-CARBONISATION PLAN – ACTION TRACKER & CASE STUDIES 
1.0 EXECUTIVE SUMMARY 
1.1 Addressing Climate Change is a global issue that is hugely reliant on    
partnership, collaboration and the actions of us all.  No single organisation can
tackle it in isolation and as a Council we need to show clear leadership and lead
by example in all that we do.  Our first Decarbonisation Plan was published in
2020 to support and align to our ‘green recovery’ from the pandemic and much
progress has been made to delivering climate commitments outlined in our
associated de-carbonisation action plan from last year.  This year greenhouse gas
emissions from the Council have reduced for the 5th year in a row and we are now
emitting 33% less CO2 equivalent than we did 6 years ago.  Our region continues
to be one of the lowest carbon emitting local authority areas in the UK due to our
natural assets (including foresty and peat), renewable energy developments and
low number of polluting industries.   
1.2 The De-carbonisation Plan sets a 3 year framework to continue our climate journey
and routmap to net zero.  Many of the actions continue from previous versions of
the Plan but importantly this year – and as specified that would be achieved – our
Council has made a clear commitment to be a net zero organization by 2045 and
has also declared a climate emergency befitting the importance and critical nature
of the topic.   Whilst the main decarbonisation plan will be fixed for 3 years the
associated Action Plan (which forms an Appendix of the document) will be
continuously updated and reported to both the Climate Change Board and Policy &
Resources Committee.     
1.3 In support of the Action Plan a number of supplementary case studies have been
provided by departments to provide the new Council additional information on the
positive climate related work the Council is undertaking.   
2.0    RECOMMENDATIONS
2.1 That the Policy & Resources Committee consider and endorse:
1. The progress of specific actions from the Decarbonisation Action Plan; and
2. The supplementary case studies that provide information on positive climate
change projects being undertaken by different departments of the Council.   
APPENDIX A – DECARBONISATION ACTION PLAN TRACKER
APPENDIX B – CLIMATE CHANGE CASE STUDIES 
Page 259 Agenda Item 10b

Page 260

APPENDIX A – Climate Change Action Plan TRACKER 
ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
W1 –Develop and Implement
Waste Strategy 
(L) Roads and
Amenity
Services,
Community,
commercial
customers
Implementation
of the Waste
Strategy
transitioning to
Landfill ban
compliant
Residual Waste
Recovery
solutions by
2025.
External funding and support
being sought from the Scottish
Government
Negotiations with the Scottish
Government (SG) continues.
Officers have procured a
consultant to conduct an
options appraisal relating to
the Waste PPP contract, this
work is underway and will be
completed by September and
reported through the EDI
committee. The SG have
recently completed an Energy
from Waste review, the
outcomes will be considered as
part of the options appraisal.
Furthermore, a Food Waste
review issued by the SG by the
end of 2022 will feature within
the circular economy
proposals. The SG circular
economy proposals include 31
current and future proposals
up to and beyond 2025 which
will have an impact on the
councils waste management,
e.g. Food Waste review,
Scottish Deposit Return
scheme, Garden Waste
Page 260

Page 261

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
collections and future statutory
recycling targets being applied
to councils. Pre-treatment
derogation works are ongoing.
Officers are engaging with the
west area waste group every
quarter which includes,
Inverclyde, West
Dunbartonshire, East and
South Ayrshire Councils, Argyll
and Bute Council and Zero
Waste Scotland. Discussion is
ongoing regarding post landfill
ban solutions.
W2 – Promote the Waste
Hierarchy through community
Education 
(L) Roads and
Amenity
Services
Evidence of
community
Education
Not secured New Web content and
Education materials for
Primary and Secondary Schools
were developed and delivered
to online Education
Environment Summit October
21 and the COP 26 Event on
the 6th November 21. 
W3 – Reduce Council use of
disposable and single use plastics
across all departments and
settings 
(L)
Procurement
and
Commercial
Services, all
Council
Services 
Adoption of new
working
practices and
procurement
No specific funding in place,
research required to impact on
operation costs 
A report on Single Use Plastic
went to the Policy and
Resources Committee on 9
December 2021, and the
following recommendations
were approved:
Page 261

Page 262

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
 Note and consider that
the various Services
that currently purchase
SUP products consider
whether these products
are essential or if there
is a potential
alternative that would
meet the Service
requirements, prior to
orders being placed via
PECOS or contacting
the Procurement,
Commercial and
Contract Management
Team (PCCMT) for a
procurement process
to be carried out.
 Note and consider that
the Sustainable
Procurement Policy will
be updated to reflect
the Climate Change
Board desire to limit
SUP where possible –
proposed wording has
been included in the
current draft version
for 2022/23, and will be
Page 262

Page 263

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
updated as follows in
the final version: “To
provide procurement
support to any strategic
decisions taken by the
Council in relation to
the usage of Single Use
Plastic products and
their recyclability.” 
 Note and consider that
the Commodity
Sourcing Strategy
templates used for
Regulated
Procurements be
updated to include a
question regarding SUP
Changes in legislation were
brought into force by the
Scottish Government on the
1st June 2022 restricting
single-use plastic cutlery,
plates, straws, drink stirrers
and balloon sticks, expanded
polystyrene food containers
and expanded polystyrene
cups and other beverage
containers, as well as all
Page 263

Page 264

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
products made of oxo-
degradable plastic.  
Some products already
changed and others under
review. 
W4 – Extend and explore pre-
ordering for school food to reduce
food waste 
(L) Commercial
Services and 
Education 
Evidence of
extension of
pre-ordering &
food waste
reduction
No specific funding in place,
research required to impact on
operation costs
National solution also being
looked at with Scotland Excel
and following universal roll out
of Free School Meals for
primary school children. 
Project Team currently
implementing this, with full
project end date estimated as
March 2023. 
E1 – Deliver Renewable Sourcing
Strategy 2 
(L) Commercial
Services 
Adoption of
Strategy
RSS2 consultancy work funding
to be confirmed; expectation is
that project implementation
will be through combinations
of prudential borrowing
(subject to business case
approvals) and/or external
funding. 
RSS2 next stage development
work includes specification
development and preparation
of invitation to tender for
specialist consultancy
support. Current work in
progress; tender issue in FQ2-
3 2022/2023 expected.
Whilst this larger
procurement exercise is
conducted, a Quick Quote
was developed in conjunction
with Procurement colleagues
to secure consultancy
Page 264

Page 265

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
support to assist with
immediate renewable
consultancy requirements
(including development of
items E2 and E3). This interim
contract has now expired but
existing commissioned work-
streams will be concluded.
E2 – Delivery of Non-domestic
Energy Efficiency Framework
(NDEEF) Projects 
(L) Commercial
Services 
Evidence of
delivery of
projects
Project development work is
funded by combinations of the
Scottish Government and the
procured provider (costs
absorbed within the tender
process). 
Funding for project
implementation will come from
Council approved capital
allocations:
 Climate Change 20/21 -
£500K
 Climate Change 21/22 -
£600K
 Asset Sustainability –
circa £100K
NDEEF Energy Performance
Contract was signed on 16 July
2021. The original NDEEF mini
project list has either been
installed or deleted by
variation. Outstanding works
are now effectively those mini
projects introduced to the
overall project to replace
deletions. Main items
outstanding are a couple of pv
installations (including Kilmory
Castle ground array which
requires planning approval)
and a full site solution for
Cardross PS (including heating
as a mandated item, solar pv,
LED lighting). Balance of works
are expected to conclude circa
October 2022.  The following
renewable solutions are
Page 265

Page 266

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
being/have been
deliveredwithin the NDEEF
package:
Solar PV: Kilmory Gardens,
Cardross PS, Blackhill Depot,
Rothesay Pool, GWIT Centre,
Lochgilphead RC, Kintyre
House. 
Air Source Heat Pump: Manse
Brae Roads Office,
Lochgilphead CEC, Strachur
Primary School, Lochgilphead
RC, Arrochar Primary School. 
In addition to the above, the
procurement sourcing strategy
for the next batch of sites,
using designation NDEEF2, is
under way.
E3 – Delivery of additional solar
installations at Council assets 
(L) Commercial
Services 
Evidence of
delivery of
projects
Consultancy work funding to
be confirmed; expectation is
that project implementation
will be through combinations
of prudential borrowing
(subject to business case
approvals) and/or external
funding.
Solar pv Options (initial
feasibility work completed for
circa 9 sites) – some
opportunities absorbed within
NDEEF (Ref item E2) as project
replacements due to
accommodation reviews. A
‘mop up’ of remaining project
prospects intended to be
market tested as a component
within an upcoming solar pv
Page 266

Page 267

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
maintenance contract (FQ2-3
2022/2023).
E4 – Delivery of Water Efficiency
Audits across our Estate 
(L) Commercial
Services 
Evidence of
delivery of
projects
Feasibility work being absorbed
within existing approved
budgets. 
Individual works items are
generally small scale and it is
proposed to utilise existing
approved budgets where
possible.
Significant Council wide asset
verification exercise and
ensuring water use minimised. 
This project will continue
throughout calendar year 2022
when a case study will be
prepared to demonstrate the
range of tasks being
undertaken and to convey the
reduction in water
consumption (with carbon
emissions reduction) and costs
arising from this already
successful project. 
E5– Delivery of Energy Efficiency
Scotland Programme 
(L) Housing
Services,
Registered
Social
Landlords 
Evidence of
delivery of
projects
Funding amounts are
determined by localised factors
and is paid as a  proportion of
the Scottish Governments’
Heat In Buildings Strategy 
Works which required
Contractors to enter housholds
were delayed by continued
Covid-19 restrictions but were
able to be replaced by external
measures ensuring the
programme continued.The
Scottish Government have
confirmed an award of
£2,011,323for the
2022/23Area Based Scheme.
Page 267

Page 268

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
E6 – Complete LED streetlight
replacement programme 
(L) Roads and
Infrastructure
Services
Evidence of
delivery of
projects
Fully funded through
prudential borrowing
We are in the process of
appointing contractors to
upgrade Street Lighting  in the
Lorn Area where we are still to
replace approx. 1100 no.
Luminaires. The Council has
14442 streetlights in total so
carbon emissions have already
been greatly reduced by the
LED Upgrade Project.
2020/21 figures were CO2
Totals 889 tonnes, this has
been reducing year on year,
back in 2015/16 figures were
CO2 Totals 3140 tonnes.
The last of the projects
installation / upgrade phases
will be completed in
August/September 2022. 
E7 – Continue support of ABRA
and review Renewable Energy
Strategy annually 
(L) Economic
Development
Evidence of
delivery of
projects 
Officer resource to support
currently funded
Work to support ABRA
ongoing.  ABRA exhibited at All
Energy in May 2022.
Current ongoing project by SSE
Networks for renewal of
powerlines between Inveraray
and Crossaig.  Possible
extension being discussed. 
Work commenced on outline
business case for progressing
Page 268

Page 269

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
Islay Energy System work
through the Rural Growth Deal. 
Islay announced as one of the
Carbon Neutral Islands being
progressed by the Scottish
Government which is expected
to complement this work. 
E8 – Continue support for offshore
development of renewables 
(L) Economic
Development
Evidence of
delivery of
projects
(expected late
2020s/early
2030s)
Officer resource to support
currently funded
Offshore wind allocation off
Islay is confirmed in Marine
Plan.
Scottish Power Renewables
have secured an option on the
site through the Scotwind
Leasing Process.
The Crown Estate Scotland is
expected to launch Innovation
and Targeted Oil and Gas
(INTOG) leasing in August 2022
which could allow seabed
rights for small scale (less than
100MW) innovation projects. 
T1 – Develop a Fleet Replacement
Strategy supportive of fuel
efficient, electric and hybrid
vehicles 
(L) Roads and
Infrastructure
Services
Adoption of
Strategy
Part for current financial year The Strategy is complete, final
review will take place to ensure
the 2025 legislative changes
are included.  The council have
introduced hybrid and electric
vehicles to the Fleet. The
Page 269

Page 270

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
council operates 14% of its
Fleet with the new technology.
T2 – Develop a vehicle routing
system that will reduce road miles
for operations 
(L) Roads and
Infrastructure
Services
Evidence of
delivery of
projects
Part for current financial year  The Council went to tender
earlier this year for route
optimisation and had a number
of bidders. Officers have gone
through the selection process
and a preferred bidder has
been chosen and their bid is
within the budget available.
Arrangements are being made
for a demo from the preferred
bidder and subject to that
being successful should be
moving towards a contract
award in early course
T3 – Develop an electric vehicle
infrastructure strategy 
(L) Roads and
Infrastructure
Services
Evidence of
delivery of
projects 
Part for current financial year 
The development of the EV
network is funded by external
grant monies from Transport
Scotland, and the costs of
developing the strategy in
terms of staff time are covered
via existing budgets
Ultimately the cost recovery
model 
Good progress has been made
with the Council’s EVC
strategy. Charging has been in
place for over a year now and
the fees appear to be covering
the council’s costs although
there have been some
problems with cash flow from
the new national back office
supplier – this is an issue being
experienced by all local
authorities and something we
are picking up as a group. In
Page 270

Page 271

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
terms of public use, this
continues to increase and
while there have naturally
been some queries and
complaints about the
introduction and operation of
charging, these have been
minimal.  The future
installation/expansion plan –
specific sites and high level
criteria – has been to public
consultation (this was pushed
back slightly in the programme
due to the local government
election and pre-election
restrictions). The main
headline from the consultation
is that 75% of those
responding support the
expansion strategy.  
With the draft expansion plan
in place we are working with
Scottish Futures
Trust/Transport Scotland and
with the aid of grant monies
going through a procurement
process to appoint a consultant
who will financially
model/estimate site works
costs so we then have a clear
Page 271

Page 272

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
picture on a site by site basis of
likely costs which will then
inform any future funding
applications and should
ultimately streamline that
process.  The Scottish
Government has published a
draft vision for EVC
development which, among
other things, includes a
number of options for local
authorities to consider in their
own expansion plans, from a
concession model to public
private partnership to local
authority-only plans. We are
currently analysing these
different models and how they
would or could apply in our
context. 
When the above workstreams
are completed we will be in a
strong position to deliver on
the 55 sites outlined in our
expansion plan and to apply for
the new Scottish Government
fund when it comes online. 
Officers are also working with
HiTRANS on their FASTER
programme which had
Page 272

Page 273

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
identified eight sites in Argyll
and Bute for installations. With
the rising costs of construction
etc, the original scope across
the region was considered to
be unaffordable and we are
working with HiTRANS,
Western Isles and Highland to
revise that scope to take
advantage of the funding
available
T4 – Support Digital by Default
theme Service Review & Recovery
Plan to reduce need to travel
All Council
Departments
Evidence of
delivery of
projects
Part for current financial year Council is adopting ‘Our
Modern Workspace’
programme and  Digital First
approach as services change
and evolve post pandemic.  
T5 – Develop new active travel
plans for Council buildings and our
towns 
(L) Economic
Development
Evidence of
delivery of
projects
Part for current financial year
No active travel funding is
provided by Council.  
External competitive challenge
funds are time consuming to
secure and work has to be
shaped to fit with external
funders aspirations and
requirements. However, at
present these are the only
available source(s) of potential
funding to deliver active travel
improvements.
The purpose of active travel
plans, for buildings or towns, is
to help direct and implement
change to encourage and make
it as easy as possible for
individuals, businesses and
visitors to choose to walk, cycle
or take public transport for
journeys.  Increasing activity
and reducing sedentary
behaviour has significant
health benefits and can
increase accessibility to
Page 273

Page 274

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
essential services, education,
employment, retail and
leisure.  Walking and cycling
are lower cost travel modes
and, if they are a viable option,
can help households reduce
their reliance on private cars,
particularly multiple car
households.
No Council funding is currently
expended on genuine Active
Travel work, with all costs,
including internal staff costs
(1.3FTE), having to be funded
via successfully securing
external challenge funds. As all
active travel work is currently
reliant on securing external
funding, therefore the projects
which are progressed are those
which can successfully secure
external challenge funding.
Council Staff Travel Plan: The
Staff Travel Plan will focus on
measures to make it easier and
preferable for staff to choose
to walk, cycle, use public
transport or car share to
commute to work or for work
journeys, or use economical
Page 274

Page 275

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
Council vehicles for work
journeys.  The travel plan
should encourage staff to
choose the most economical
and least environmentally
damaging travel
mode.  Engagement of services
which manage staff in building
and/or council buildings is
essential to creating
deliverable and effective travel
plans for Council staff.  This
includes Estates, HR, SMT and
building users.  It is
recommended that work on
the Council Staff Travel Plan is
commenced after a decision
has been made on future staff
working patterns and office
rationalisation as these will
have a significant impact on
the Council Staff and their
travel.  There is currently no
funding secured to enable this
work to be progressed.   
Active Travel Plans for Towns:
There are Active Travel Plans in
place for the main towns in
Argyll and Bute, albeit some
Page 275

Page 276

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
are now quite historic.  The
town Active Travel Plans focus
on identifying potential active
travel route networks for key
towns.  These provide a
framework for the
development of new active
travel routes, which will enable
and encourage residents,
businesses and visitors to
choose to travel more
actively.  No funding is
currently secured to enable the
Active Travel Plans for towns to
be updated.  
Argyll and Bute Active Travel
Strategy: It is recommended
the Committee instruct
Officers to develop an Argyll
and Bute Active Travel Strategy
and present it to full Council
for approval within 18 months
of Committee instruction.  The
Active Travel Strategy would
provide the overarching
context for the Council to
support and promote active
travel across the Council area.
Page 276

Page 277

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
No funding is currently secured
to enable the Active Travel
Strategy to be developed. 
PA1 – Review Council Flooding &
Coastal Protection Policy 
(L) Roads and
Infrastructure
Services
Review of policy No specific funding in place,
research required to impact on
operation costs
Reviews are in process. 
PA2 – Review Council Sustainable
Procurement Policy 
(L)
Procurement 
Review of policy  No specific funding in place,
research required to impact on
operation costs
This policy is reviewed on an
annual basis. 
OFF1 – Develop opportunities for
Carbon Offsetting with ACT and
partners 
(L) Climate
Change Board,
ACT and
partners
Delivery of
projects 
Limited funding via ACT for
existing projects
ACT have completed Phase 1 of
native woodland planting on
Argyll and Bute Council land
around Kilmory, under
compensatory planting
agreement with SSEN.  22
hectares now completed, with
deer management and follow
up programme in place.  Phase
2 planting scheduled for winter
22/23.  ACT have also cleared
Invasive Rhododendron
ponticum from 18 hectares of
native woodland around
Kilmory with support from the
Nature Restoration Fund
21/22.    ACT and SSEN are
discussing futher non-
Page 277

Page 278

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
compensatory planting, with
potential for Carbon Credits. 
Argyll and Bute Council Policy
and Resources Committee
have supported this proposal. 
ACT’s peatland restoration
project CANN concludes in
September ’22 with over 500
hectares of peatland improved,
two Conservation Action Plans
and 4 -years of endangered
species monitoring and surveys
being completed.  ACT have
secured support for a follow on
project, restoring peatland and
building on community
resilience and capacity.  ACT
will be supported by Esmee
Fairbairn Foundation, Peatland
Action (NatureScot) and are in
discussion with Islay distilleries
to design a sustained
programme of investment.
All of ACT staff are now Carbon
Literacy Trained, and ACT is
registered as a Carbon Literate
Organisation, and is now
accredited as a Carbon Literacy
Training provider.  68
Page 278

Page 279

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
community members have
been trained via the ACTNow
project.  92 tonnes of CO2
have been saved through
ACTNow’s bike refurbishment
project, and 23 good as new
bikes have been gifted to
community members in Mid-
Argyll.  3700 kg of food has
been saved from landfill and
redistributed to Mid-Argyll
residents, and 264 volunteer
hours have been recorded over
40 events run by ACT with a
climate focus.  A legacy of the
ACTNow project is the ACT Hub
at Blarbuie offering tools and
equipment to help community
members to reuse, repair and
recycle.   A follow on project is
now in place, funded by
Smarter Choices, Smarter
Places via Argyll and Bute
Council,  including cycle and
ebike training and workshops.  
ACT partnered with Cove Park
artists residency to become
one of 7 Climate Beacons for
COP26, which used Argyll’s
Rainforest as its inspiration for
Page 279

Page 280

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
work with film-makers, school
children from Lochgilphead
and Helensburgh, and artists. 
The project was supported by
Creative Carbon Scotland. 
COMM1- Develop and deliver
Communications Plan to support
Decarbonisation Plan 
(L) Climate
Change Board
and
Communicatio
ns Team
Delivery of
Communications
Plan
Part of Communications
Support 
External communications
We continue to promote
actions the council is taking,
and actions that others can
take, to develop climate-
friendly Argyll and Bute. For
example:
 Promotion of EV
charging points
consultation on social
media, press release,
website and weekly
news round-up.
 Infrastructure plans,
including £170k
investment in low
emission council
vehicles
 Green flag awards in
schools
 Promotion of outdoor
nurseries
Page 280

Page 281

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
 Reinforcement of
climate-friendly Argyll
and Bute brand eg with 
Waste Strategy
Manager vacancy, and
reduce your food waste
promotion 
 Delivery of school
meals using drone
 Promotion of
Community
Development climate
proof training
 Islay plans to become
carbon neutral by 2040
 Pippa’s podcast on
social media about how
to save the planet and
your purse
 Home Energy Efficiency
Programme
 Carr Gomm staff using
bikes instead of cars
 Lochdonhead won
Woodland Trust Green
Trees Award 
Page 281

Page 282

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
COMM2 - Engage with community
and partners and deliver Climate
Change Directory for our region 
(L) Community
Planning and
Development
Team
Delivery of
engagement
map 
In place until end of financial
year
Web page is active and live 
https://www.argyll-
bute.gov.uk/cpp-climate-
change
Community Groups and
initiatives mapped and
promoted on website. Input to
and reporting back from the
Community Planning
Partnership Climate Change
Group.
Regular update of webpage
directory.  Ongoing dialogue
with Community Planning
Partnership.
2 x Meetings have taken place
with Argyll and Bute Branch of
National Farmers Union (NFU)
and workshop currently being
scoped out to explore Climate
Change opportunists across
the Agricultural and Land Use
Sector.  Headline topics likely
to include :- Sustainable
Upland Farming, Planting for
Carbon Sequestration,  Dairy
Industry and Suckling Beef.  
Page 282

Page 283

ACTION LEAD (L)
AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
COMM3 - Monitor the delivery of
actions in the Climate Change
Action Plan and review in 2024
(L) Climate
Change Board 
Review of this
plan by
December 2024 
Monitored through Tracker to
be submitted quarterly to
Policy & Resources Committee. 
Completed – next review Dec
2024 
Page 283

Page 284

APPENDIX B – Climate Change Case Studies 
CASE STUDY 1 – ISLAY CARBON NEUTRAL ISLAND
Green light for Islay’s carbon neutral future (argyll-bute.gov.uk) – 19 May 2022
A reduction in fossil fuels and increased use of renewable energy sources – these are just
some of the ambitions for Islay’s carbon neutral future.
Islay is one of six Scottish islands, announced by the Scottish Government to become fully
carbon neutral by 2040. The initiative is part of the Carbon Neutral Islands project, aimed at
supporting islands to achieve their carbon neutral ambitions.
Argyll and Bute Council recommended Islay as an ideal candidate for inclusion due to the mix
of potential energy sources on the island including offshore wind proposals and potential tidal
schemes. In addition, there are opportunities to capture carbon through peatland restoration
on the island. 
CASE STUDY 2- PROMOTION OF DE-CARBONISATION PLAN
Council takes steps to achieve net zero target (argyll-bute.gov.uk) – 9 Dec 2021
Argyll and Bute Council re-affirmed its long-term commitment to tackling the climate
emergency and achieving its ambitious net zero emissions targets.
The latest version of the council’s Decarbonisation Plan was approved in December 2021.
This sets out the council’s three-year strategy for tackling climate change and achieving net
zero emissions across Argyll and Bute.
Argyll and Bute is a leader in wind and hydro power production and its sparse population,
high forest, peatland cover and a low number of polluting sources means it is already one of
the lowest net producers of carbon in the UK and almost carbon neutral, far ahead of most
other regions.
CASE STUDY 3 – MAKING OUR FLEET GREENER
Installation of Electric Vehicle (EV) Chargers for Council Fleet Vehicles - Case Study (June
2022)
Introduction
Argyll and Bute Council has been offered grant funding, through the Energy Savings Trust
Switched on Fleets programme to procure a number of electric/hybrid vehicles and charging
points for use by Council fleet vehicles. This case study provides a high level of information in
respect of the process involved from securing grant funding through to eventual installation of
the funded EV charging points.
Description  
Joint working arrangements were agreed between the Council’s Fleet Management and
Property Services personnel late in 2020 to make a 20/21 funding application for a number of
charging points up to a value of £50K. Due to deadlines, a quick turnaround was required to
undertake the main tasks:
 Establish spare electric capacity in buildings (timelines precluded new connections).
 Match buildings with spare electric capacity to demand for EV vehicle usage; spread
across area.
 Arrive at list of locations with EV sizes/quantities dictated by available electrical
capacities.
 Specification drawn up considering SwitchedonFleets requirements also.
Page 284

Page 285

 Procurement exercise undertaken using local term contractors, with them engaging
specialist sub-contract.
 Application for funding request made to SwitchedonFleets with later request for additional
funding; all approved.
 Works orders placed with local term contractors.
 Specialist sub-contractor surveys identified need to vary original intent with additional
costs.
 Works completed and paid for 2021; grant funding received. 
 EV registered with ChargePlaceScotland and made available for use. 
Final list of sites with newly installed EV detailed in table below.
Site Town No. Connection Points
Helensburgh and Lomond Civic
Centre
Helensburgh 4 @22kW each (dual free standing
units)
Corran Halls Oban 4 @22kW each (dual free standing
units)
Baliscate Depot Tobermory 1 @ 7kW (single wall mounted unit)
High Street Depot Rothesay 1 @ 7kW (single wall mounted unit)
Blackhill Depot Helensburgh 4 @22kW each (dual free standing
units) 
Note: charging times vary depending on vehicle and connection point. 
Images of free standing dual EV charging units, with marked parking bays, installed at
Helensburgh and Lomond Civic Centre 
CASE STUDY 4 - NON-DOMESTIC ENERGY EFFICIENCY FRAMEWORK (NDEEF)
PROJECT - (June 2022) 
Introduction
Carbon emissions associated with the Council’s estate and buildings accounts for over 20%
of the Council’s overall carbon footprint. These emissions arise from use of electricity, gas,
heating oil and water in premises. Switching to more efficient technologies not only benefits
both energy consumption and energy cost but also improves ‘green credentials’. Against this
background, Argyll and Bute Council have utilised the Scottish Government Non-Domestic
Energy Efficiency Framework (NDEEF) to deliver a range of Energy Conservation Measures
(ECM’s) at 11 No. Council properties.  The delivery of these ECM’s not only reduces energy
costs but also contributes to the Council meeting Climate Change targets. This case study
Page 285

Page 286

provides a high level of information in respect of the process involved from project inception
through to eventual installation of the ECM’s.
Description  
In late 2020 approximately £1.2Million of viable project work was identified across 11 No.
assorted council premises delivering anticipated annual savings of £123k which represents a
payback of 10.2 years. A Commodity Sourcing Strategy for Energy Efficient Solutions was
conducted and the use of the NDEEF was selected as the preferred delivery mechanism.  A
DMT Paper to utilise the NDEEF was approved in mid 2021 and a tender exercise was
subsequently carried out. ECM installation works commenced in late 2021 and will be
complete by July 2022. 
The following properties were selected for the NDEEF on the basis of perceived opportunities
for energy efficiency savings and because previously identified capital works to replace the
oil fired heating systems were required to be delivered at some of the locations: 
Site Town
Manse Brae Roads Office Lochgilphead
Lochgilphead Community Education
Centre
Lochgilphead
Kilmory Castle Lochgilphead
Riverside Leisure Centre Dunoon
Lochgilphead Learning Resource Centre Lochgilphead
Rothesay Leisure Pool Rothesay
The Moat Centre Rothesay
Kintyre House Campbeltown
Graham Williamson IT Centre Helensburgh
Arrochar Primary School Arrochar
Strachur Primary School Strachur 
Works content included the introduction of energy efficient LED lighting, improved heating
and ventilating controls, installation of air source heat pumps and solar PV. A full list of the
ECM’s selected is included below: 
Annual Saving
ECM kWh CO2
(tonnes)
£
LED Lighting Upgrade 225,968 62.7 27,521
Solar PV 192,140 53.3 22,241
High Efficiency Air Handling Unit 226,000 41.6 4,475
Building Management System (BMS)
Optimisation
237,343 69.1 17,865
Air Source Heat Pump (ASHP) 420,842 105 17,704
Boiler Optimiser 233,588 42.9 4,625
Refrigeration Optimiser 7,980 2.2 862
IT Server Room Cooling Upgrade 111,813 31 13,698
Swimming Pool Pump Control 70,300 19.5 9,139
Electronic Thermostatic Radiator Valves 5,800 1.8 201
Pipework Insulation 23,292 1.7 1,413
Air Conditioning System (A/C) Optimiser 29,674 8.2 3,858 
Page 286

Page 287

Images of ASHP at Arrochar PS and Strachur PS 
Image of Solar PV at Kintyre House, Campbeltown. 
Next Steps
A second NDEEF project is planned for commencement in 2023. It is anticipated that it will
be of a similar size and scale to the current NDEEF project. Preliminary steps are underway
to develop and refine a list of buildings for inclusion in the project.
Page 287

Page 288

Useful Links
Non-domestic energy efficiency framework over £1m projects 2020-2024 - gov.scot
(www.gov.scot) 
Image of free standing dual EV charging unit installed at Helensburgh and Lomond Civic
Centre with instructions for use; Image of single wall mounted EV charging unit installed at
High Street Depot, Rothesay. 
Next Steps
Similar joint working arrangements were agreed to make a 21/22 funding application for a
number of charging points (value £33.4K). Local term contractors have again been appointed
to undertake works which are scheduled for implementation in 2022. Planned additional EV
chargers are detailed in table below:
Site Town No. Connection Points
Helensburgh and Lomond
Civic Centre
Helensburgh 2 @22kW each (dual free standing
units)
Jacksons Quarry Depot Oban 2 @22kW each (dual free standing
units) 
A financial/budgetary reconciliation is required as the use of buildings electricity for vehicle
charging replaces previous vehicle fossil fuel use. 
Useful Links
 Switched On Scotland Phase Two: An Action Plan For Growth (transport.gov.scot)
 j457836-06 | Transport Scotland 
CASE STUDY 5  - RENEWABLE SOURCING STRATEGY - (June 2022)
Introduction 
Scotland has achieved many milestones in renewable energy, particularly in wind energy
generation. Renewable energy is essential to the future of our planet and Scotland has already
carved a place in the forefront of the power revolution. It is now a global leader in sourcing
electricity from its substantial natural resources.
This case study provides a high level of information in respect of some of the work undertaken by
Argyll and Bute Council in assessing the optimal opportunities for installation of renewable
technologies through to eventual installation of same. Renewable energy will continue to play a
Page 288

Page 289

central role in meeting both Scotland’s and Argyll and Bute Council’s target of net-zero
greenhouse gas emissions by 2045.
Description  
Argyll and Bute Council, in conjunction with a specialist consultant, has assessed the bulk of its
estate (over 1,100no. land/property assets) as part of the Council’s Renewables Sourcing
Strategy (RSS1). This strategic assessment included evaluation of mature renewable
technologies in conjunction with a screening of the Council’s land/property asset information to
identify and rank (using key benefits criteria) the most appropriate renewable energy installations.
This strategic assessment and ranking has ensured that projects are prioritised, avoiding a
potential ‘scattergun’ approach. 
All of the most viable projects (summarised herein) have now been delivered. Projects have been
funded on a ‘spend to save’ basis and have accessed supportive UK Government funding such
as Feed-in-Tariff (FIT) and Renewable Heat Incentive (RHI). 
Consequently, Argyll and Bute Council now has 13no. biomass installations, with installed
capacity of circa 3.2MW, using combinations of wood pellet and locally sourced wood chip for
fuel. A further 140kW biomass boiler was integrated into the recently constructed Mull
Progressive Care facility, a joint project between West Highland Housing Association, National
Health Service and Argyll and Bute Council. 
Image of off-site manufactured biomass boiler-house installed at Ardrishaig Primary School and some of the roof mounted
solar pv panels installed at Hermitage Primary School in Helensburgh.
To provide a sense of scale, Argyll and Bute Council has steadily reduced its heating oil
consumption over the last 15 years by approximately 70% (from circa 23 Million kWh of oil
per annum to circa 7 Million kWh per annum) largely through fuel conversions to biomass/gas
fuel sources with lower cost and carbon emissions. 
Despite electrical grid constraints, Argyll and Bute Council has also installed around 1.1MW
of solar photovoltaic panels across 19no. sites, mainly on school buildings. A particular
Page 289

Page 290

challenge that was overcome included the need to make contractual provision for renewable
installations on PFI/NPDO schools. Fortunately, all parties cooperated to ensure successful
project delivery alongside existing school contract
arrangements. 
A single 60kW wind turbine has also been installed on a
landfill site on the Isle of Mull, named ‘Miss Hoolie’ by
local school children. 
Images of
60kW wind
turbine at
Glengorm
landfill site
on the Isle of
Mull taken at
the time of the ‘Miss Hoolie’ naming ceremony. 
Next Steps
Given the deemed success of the RSS1 and subsequent technological advancement,
political landscape change, alternative funding stream availability etc, Argyll and Bute Council
is currently working towards a second phase of whole portfolio renewables assessment
(RSS2). This is identified as a target in the Climate Change Action Plan which is an integral
component of the Argyll and Bute Council Decarbonisation Plan. 
CASE STUDY 6  - CIRRICULUM FOR EXCELLENCE
Curriculum for Excellence sets expectations for the teaching and learning climate change and
climate action within the experiences and outcomes and under the umbrella of Learning for
Sustainability. There is a wide variety of climate action activities and projects throughout
education establishments in Argyll and Bute. 
In a recent survey (May 2022) of schools in Argyll and Bute, we received 22 responses. Most
schools have studied Climate Change within the past 3 years, use outdoor learning regularly,
grow their own vegetables and have a litter campaign. Almost half of them have achieved the
Green Flag, from Eco-schools, in the past 3 years, with at least 2 reporting their 7th Green
flag achievement. Other projects include: The Big Wheel and Walk (national competition
organised by SUSTRANS which is a fortnight of walking or cycling to school), The Queen’s
Green Canopy: national tree planting, RSPB Big Birdwatch, John Muir Award, RHET Royal
Highland Educational Trust (food and farming projects).
Page 290

Page 291

The following 7 case studies are some examples of good practice in Argyll and Bute schools. 
CASE STUDY 7: SCHOOLS CLEAN AIR DAY
Rhunahaorine Primary School 
On Thursday 16th June the children from Rhunahaorine Primary participated in Clean Air
Day, the UK’s largest campaign on air pollution run by the charity Environmental Protection
Scotland (EPS).    This is the third year the children have taken part.  
All of the children did a traffic survey.  The school is on the A83 which is the main road on the
Kintyre Peninsula leading to Campbeltown.  As well as helping the children think about air
pollution infants were introduced to tally marking and the older children produced more
complex graphs with their results.  
The pupils are continuing to embrace the anti-pollution theme with activity colouring books
sent from EPS.  These promote walking, cycling, electric cars and caring for nature. 
CASE STUDY 8: YOUNG STEM LEADERS AND AMBASSADORS
Kilcreggan Primary School 
Young STEM Leader Programme As part of earning their Young STEM Leader 2 award,
pupils decided to hold their own climate conference in school, presenting to all other classes.
As part of this, they created working models of various renewable energies and also used
models and demonstrations to demonstrate the impacts of climate change and global
warming. They also did comprehensive research to create impactful, informative PowerPoints
to accompany their demonstrations.
We used the STEM Ambassador programme to host visitors virtually to all classes across the
school. We had renewable energy engineers, civil engineers and climate scientists and also
Polar explorer Craig Mathieson who does a lot of climate action work. 
Kilcreggan STEM Google Site Pupils have recorded and shared much of their learning on our
STEM Google site, visible to all staff and pupils. 
CASE STUDY 9: ECO-HOUSING PROJECT
Kilcreggan Primary School 
The final project this year was a design challenge based on ECO housing. Pupils were
researching the makeup of the Scottish landscape and how certain natural resources are
used. To take this idea further they were presented with a brief to design an ECO friendly
museum, which would celebrate the local surrounding environment while having as small a
carbon footprint and energy consumption as possible. This was a great project where the
Page 291

Page 292

pupils really outdid themselves. Again this referred to the central themes of sustainability, the
global goals and also climate change. 
CASE STUDY 10: TREEMAZON
Barcaldine Primary School 
In response to COP26, learning about Climate Change and taking part in the Argyll and Bute
Education Climate Summit, pupils from Barcaldine Primary School decided to take action.
Their proposal was to set up a tree nursery using locally sourced seed. After researching how
to collect, store and sow seeds, pupils and families gathered seeds over a few weeks in
autumn. Species included oak, rowan, hazel and birch. Growing beds and pots were
prepared by the children and protective boxes, to keep unwanted mice out, were built by
parents. Seeds were sown and labels made for each garden plot. 
Over winter and spring, we waited, and watered, and waited, and weeded… and waited. The
children took responsibility to care for the nursery and created a rota of jobs. They suggested
and voted for a name for our nursery and designed logo. The chosen name was
‘Treemazon’, which makes a lovely connection to our own local Atlantic Rainforest. 
Finally, in late spring, growth was spotted. We now have a very fine crop of oak seedlings, a
few hazels and the birch are just appearing. Once the seedlings are more established we
plan to share them with the community. We also have a contact regenerating a woodland
croft and plan to get involved with that next year. 
Then of course, in autumn, we will start collecting seeds again, and expand our business
further. 
CASE STUDY 11: CLIMATE ACTION AND THE WORLD OF WORK
Bowmore Primary School 
COP26 in 2021 provided the perfect hook for an introduction to teaching climate change and
linked appropriately to our action plan for our next Eco School’s Scotland Green Flag award. 
By teaching the children about the goals selected at COP26 the upper primary children were
introduced to the impact and benefits of transport on our environment, food miles, shopping
Page 292

Page 293

locally and how to reduce our carbon footprint. The IDL was social studies, topical science
and literacy focused. 
We took part in Google Meets on offer from our local authority to learn on peat restoration
projects and why this is relevant to our local community and environment. Our world of work
and distilling topic in term 4 April 2022 then retrieved all of the knowledge learned in the
previous IDL as the pupils understood the use of peat in many local distilleries used to make
whisky which our island is famous for. 
The final presentation and assessment was a talking and listening focused based round
designing and creating a sustainable distillery cooperatively in terms of the resources water,
peat usage, electricity and using locally sources items to reduce impact on the environment.
The pupils presented their work and applied their knowledge of the learning which took place
on their visit to Bowmore distillery and in class to explain roles, responsibilities, skills and
scientific processes for each job in the areas of the distillery. 
CASE STUDY 12: PORT ELLEN DENIM
Port Ellen Primary School
This year the whole school did an in-depth piece of interdisciplinary learning on the topic of
Climate Change linked to the COP26 conference. Part of this was looking at the impact we
were having on the Earth in terms of it’s resources and how the way we lived was detrimental
to the environment. Children did their own carbon footprints and looked at the Earth
Overshoot Day…we were all horrified! 
Part of our learning was about waste linked to fashion. We had a contact at Arkdefo, a
company that reuse denim, and this inspired us in designing with fabrics/denim, learning
practical craft skills and developing an understanding of how we can live more sustainably. 
CASE STUDY 13: FOOD SHARE WITH THE COOP
Inveraray Primary School
We have been an Eco School for many years and interested in environmental projects.  The
Food share project has been a positive addition to the work that we are currently doing.
The food Waste work has involved combining a number of elements in our school:-
1. We have introduced the Sustainable Development Goals as part of our every day
school work, linking what we do in class to the Sustainable Development Goals.
2. Our Eco topics are “Food and the Environment” and “Zero Hunger”.  We have been
learning about food labelling, the importance of local produce, how to reduce
packaging and where our food comes.  We have raised awareness of these elements
through a One Planet Picnic where all pupils and staff in our school brought in a
packed lunch with minimal packaging, where possible locally sourced and enough
food so we did not have to bin any.
Page 293

Page 294

3. We have had support from the ACT Now project to set up a system with the Co-op
where any ambient food waste is collected from the Co op and distributed on a
Monday, Tuesday and Wednesday.  As children have been learning about food waste
and the need to reduce this we have used this food in a number of ways:- 
Early Level Class – learning about food by using items in their play, mud kitchen and tough
trays.  Helping to prepare snack and incorporating the fruit and vegetables supplied. 
Primary 1 – 7 – Food is distributed to all classes.  Some is used as part of a class snack and
some is taken home to be used at home.  All children have access to the food.
We have kept a tally chart of number of items we have received from the Coop and the Eco
Committee have helped to count and distribute the food to the classes.  In the next school
year we will start weighing the amount of food we receive. Act Now have also funded
workshops for us with Highland Herbal to show the children how to preserve foods.
Our children are more aware of where their food comes from.  They can talk about labelling,
packaging and food preservation.  The younger children have been exposed to a wide variety
of food in their play and can talk about colour, textures and names of different fruit and
vegetables.  They have also tasted a wide variety of fruit and vegetables. Our older children
understand the issues in using single use plastics and the importance of reducing waste
around the planet.
The Co op Food share Scheme is a great venture, it genuinely prevents good food going to
waste and offers it back to the local community. We are very grateful to Inveraray Coop for
Page 294

Page 295

their support and look forward to continuing this work in the future.  We are in the processing
of building a Community Garden and we hope to continue developing children’s knowledge
and experience of where our food comes from, how to grow food and how to prepare and
preserve food. 
CASE STUDY 14: TREE PLANTING PARTNERSHIP WITH SSEN TRANSMISSION 
ACT-ing in partnership to support Scotland’s rainforest
SSEN Transmission and leading community and conservation organisation, Argyll and
the Isles Coast and Countryside Trust (ACT), and Argyll and Bute Council have joined
forces to help deliver SSEN Transmission’s compensatory tree planting commitments
and in doing so, help support and enhance Scotland’s rainforest in Argyll.
Argyll's rainforest, also known as Atlantic woodland, temperate rainforest or Celtic rainforest,
is a unique and rare habitat of ancient and native woodland, open glades, boulders, rocky cliffs
and river gorges.  Scotland is now the last stronghold for this habitat that was once widespread
along the Atlantic coast of Europe.  The mild, wet climate of the west coast of Scotland provides
perfect growing conditions for this diverse habitat that supports a variety of plants and animals.
The ground-breaking partnership will see ACT help deliver SSEN Transmission’s
compensatory tree planting relating to its Inveraray-Crossaig transmission project, with the
initial phase of planting underway on Argyll and Bute Council’s sites near Lochgilphead in
Argyll.  By planting native species, the planting will support local flora and fauna, creating
natural habitats for native species to thrive, supporting SSEN Transmission’s commitments to
deliver biodiversity net gain and compensatory planting on all its major projects.  
The planting will also create a natural asset for the local community to enjoy for generations to
come, leaving a positive lasting legacy beyond SSEN Transmission’s primary objective of
delivering a network for net zero emissions across the north of Scotland.
The partnership was formally announced this week in Lochgilphead, with members of SSEN
Transmission, ACT, and Argyll and Bute Council coming together to undertake some of the
initial native species planting. 
Richard Baldwin, Head of Consenting and the Environment for SSEN Transmission, said:
Page 295

Page 296

“I’m really excited about our partnership with ACT to deliver our compensatory planting for our
Inveraray-Crossaig project.  By working in partnership with local experts we can ensure our
compensatory planting focusses on the right species, in the right locations, to deliver the right
outcomes for the local communities in which we operate. 
“Argyll’s rainforests are a truly stunning and precious resource and we’re delighted to be
playing a small part in helping ensure the long term sustainability of this nationally significant
natural asset.  You can’t help but be mesmerised when you first discover Argyll’s rainforest
and ACT’s dedication and passion to protect and enhance this wonderful natural asset is great
to be part of.  
“As we continue to deliver a network for net zero emissions across the north of Scotland, we
are committed to doing so in a responsible and sustainable way, helping sustain and enhance
the local habitats in which we operate. We look forward to building on this initial planting project
with ACT and other community organisations across the north of Scotland, leaving a positive
legacy for generations to come.”
Ross Lilley, ACT Chairman, said:
“This partnership with SSEN Transmission and Argyll and Bute Council has been a very
significant one for ACT as we’ve been able to create new native woodland sites which is an
important part of Argyll’s Rainforest Strategy.  
“By improving existing woodland, as we have recently done at Kilmory and Glenan woods with
extensive Rhododendron ponticum removal, and gradually linking up the clusters of Rainforest
with new planting, we can create corridors for the rare species that are unique to our Rainforest
habitat to thrive.  
“Argyll is incredibly fortunate to be home to more than half of Scotland’s rainforest and to
ensure that it is safeguarded, we will need a partnership approach from businesses,
communities and agencies.  This agreement between SSEN Transmission, ACT and Argyll
and Bute Council is a great example of what can be achieved.”
Ross Mclaughlin, Head of Commercial Services at Argyll and Bute Council said:
“It’s important that we take all steps we can to make day-to-day life in Argyll and Bute climate-
friendly. We are pleased therefore to support this woodland conservation initiative. Becoming
climate-friendly is about developing sustainable ways of living and working, to protect the
planet on which we all depend for our future generations.”
ENDS
Notes to editors:
 Photographs will be available from 12 noon on Wednesday and will be circulated.
Page 296

Page 297

 ACT is a community-led organisation and registered charity, established in 2014.  Their
mission is to sustainably maintain, enhance and promote the coast and countryside of
Argyll and the Isles.  https://www.act-now.org.uk/ 
About SSEN Transmission
 SSEN Transmission, operating as Scottish Hydro Electric (SHE) Transmission plc,
owns, operates and develops the high voltage electricity transmission system in the
north of Scotland and remote islands.   
 SSEN Transmission is part of SSE Group – the UK and Ireland’s clean energy
champion.
 SSEN’s strategic priority is to enable the transition to a low carbon economy through
building the transmission infrastructure necessary to connect and transport renewable
energy.  
 https://www.ssen-transmission.co.uk/ 
Ross McLaughlin ABC; Ross Lilley ACT; Richard Baldwin SSEN Transmission 
CASE STUDY 15: SCHOOL CLOTHING BANK
The Council has been working with community groups and voluntary organisations across
Argyll and Bute Council to launch phase 1 of the school clothing bank. The aim is that no
child should feel like they are going to school in the wrong clothes. By the end of phase 2 in
December 2022 we will be able to provide a good quality reused school uniform for every
Early Learning Centre, Primary and Secondary school across Argyll and Bute. 
We are working with Helensburgh Parish Church, Kintyre Recycling Limited, Inspiralba,
Dunoon Youth Centre Hub and Fyne Futures in the areas of Helensburgh, Dunoon and
Page 297

Page 298

Rothesay to make the Clothing Bank happen. We have also had great engagement from
schools and parent councils across these areas. The Clothing Bank will eventually cover
urban and rural schools in those areas too. In Dunoon, Rothesay and Campbeltown the
secondary schools are looking to use the project to create Social Enterprise opportunities for
pupils in their schools. The Social Enterprise Academy will provide support to Rothesay
Academy in looking at opportunities in this area to create a social enterprise. 
Over the summer and into August we will speak to schools in Mid Argyll, Oban, Lorn and all
of the Islands as phase 2 of this roll out in order to ensure there is provision across the area
for these services. We are currently developing our web content, e-form and a
communication strategy to link the provision together. Finally we are looking for a brand
name linking the uniform to climate change and saving the planet to really pull the project
away from the stigma that surrounds clothing bank and anti-poverty. 
CASE STUDY 16: HOUSING SERVICES AND FUEL POVERTY 
Between 2018 and 2022, 909 households have received insulation measures through the
Energy Efficient Scotland: Area Based Scheme (ABS). Insulation measures make homes
warmer, reduce energy bills and in turn fuel poverty, and decrease carbon emissions. As a
result of installing insulation measures to 105  households in 2021/22, it is estimated that just
short of 100 tonnes of carbon emissions were saved in that period alone. The Energy
Efficient Scotland programme is an area based scheme, funded by the Scottish Government
and delivered by Argyll and Bute Councils’ Home Energy Efficiency Project Team and will
continue to run until at least 2024. The scheme offers insulation measures to private
households and privately rented properties throughout Argyll and Bute. The scheme
contributes to reducing carbon emissions and improving energy efficiency of homes, as well
as being part of the Scottish Government’s route map to an energy efficient Scotland. In
2021/22, Argyll and Bute Council continued to support Argyll Community Housing
Association (ACHA) with their Warm Homes Project.  In addition to previous years funding an
additional £747,600 of funding was secured jointly by Argyll and Bute Council and the
Scottish Government to install external wall insulation to eligible private homes in mixed
tenure blocks. An additional 89 private owners were supported by receiving insulation. ACHA
have also been administering a wider programme of the installation over 1000 air source heat
pumps across Argyll and Bute throughout 2021/22. Through the Energy Efficiency Forum,
Argyll and Bute Council will continue to support key partners on projects which will contribute
to reducing carbon emissions.    Through the Strategic Housing Investment Fund, Housing
Association Partners are required to build properties to increasingly greener standards.
Page 298

Page 299

Page 299

Page 300

This page is intentionally left blank

Page 301

1 
ARGYLL AND BUTE COUNCIL        POLICY AND RESOURCES
COMMITTEE       
COMMERCIAL SERVICES                                 11th AUGUST 2022 
COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 – UPDATE – EXPRESSIONS
OF INTEREST / ASSET TRANSFER REQUESTS / REPORTING REQUIREMENTS 
1. EXECUTIVE SUMMARY 
1.1  The purpose of this report is to advise the Policy and Resources Committee on: 
 The operation of the processes in regard to formal Asset Transfer Requests
(ATR) and Participation Requests in terms of the Community Empowerment
(Scotland) Act 2015;
 Current live informal Expressions of Interest (EOI’s) which may become
subject to a formal asset transfer request or be dealt with outwith the formal
asset transfer request process;
 Current live ongoing or agreed Participation Requests received by the Council;
and
 The annual reporting requirements in respect of Asset Transfer Requests and
Participation Requests set out in Section 95 and 32 of the Community
Empowerment (Scotland) Act 2015 respectively. 
RECOMMENDATIONS 
1.2 It is recommended that: 
The Policy and Resources Committee note the report. 
Page 301 Agenda Item 11

Page 302

2 
ARGYLL AND BUTE COUNCIL        POLICY AND RESOURCES
COMMITTEE 
COMMERCIAL SERVICES                                 11th AUGUST 2022 
COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 – UPDATE – EXPRESSIONS
OF INTEREST / ASSET TRANSFER REQUESTS/ REPORTING REQUIREMENTS 
2. INTRODUCTION
2.1 The purpose of this report is to advise the Policy and Resources Committee on: 
 The operation of the processes in regard to formal Asset Transfer Requests
and Participation Requests in terms of the Community Empowerment
(Scotland) Act 2015;
 Current live informal Expressions of Interest (EOI’s) which may become
subject to a formal asset transfer request or be dealt with outwith the formal
asset transfer request process;
 Current live ongoing or agreed Participation Requests received by the Council;
and
 The annual reporting requirements in respect of Asset Transfer Requests and
Participation Requests set out in Section 95 and 32 of the Community
Empowerment (Scotland) Act 2015 respectively. 
3. RECOMMENDATIONS 
It is recommended that: 
3.1 The Policy and Resources Committee note the report. 
4. DETAIL
4.1      The Council operates processes in compliance with parts 3 and 5 of the Community
Empowerment (Scotland) Act 2015 in regard to: 
 Asset Transfer Requests (ATR’s) (part 5 of the Act) which came into force on 23
January 2017.   ATR’s enable community bodies to make requests to all local
authorities, Scottish Ministers and a range of public bodies for any land or
buildings they feel they could make better use of. They can request ownership,
lease or other rights as they wish.
 Participation Requests (Part 3 of the Act) which came in to force on 1 April 2017.
These are requests to public bodies which, if granted, enable communities to
participate in decisions and processes which are aimed at improving outcomes.
Page 302

Page 303

3 
EXPRESSIONS OF INTEREST (EOIs)
4.2 There were thirteen (13) active Expressions of Interest (EOIs) (as at 31st May 2022)
and all active EOI’s are listed in Appendix 1. In the current year 7 EOI’s have been
received 1 of which was subsequently withdrawn. To date, since January 2017, 74
EOIs have been received of which 61 have been resolved or withdrawn. It should be
noted that the Council has continued to engage with community groups who have
had EOI’s active for a significant period of time and while they remain active the
requesters have not yet moved them on. There are currently no significant actions
outstanding for the Council in relation to these. 
4.3 Further, most EOIs would not progress or develop into a formal asset transfer
request. EOIs are dealt with in a way that seeks to deliver the outcome required by
the community group allowing the request to progress outwith the formal asset
transfer process. Some EOIs are also withdrawn for a variety of reasons such as the
group changing focus of what was needed, a better option becoming available or a
lack of time and resources to progress their plans. 
ASSET TRANSFER REQUESTS
4.4 The Council has put in place information, advice and guidance to community bodies
who are interested in making a formal ATR and further information on this can be
found on the Council’s website at https://www.argyll-bute.gov.uk/asset-transfer.
There have been 3 ATRs submitted following the implementation of the Act and as
at 31st May 2022 there were no active ATRs.
4.5 In May 2020 the Best Value Assurance Report prepared by Audit Scotland noted that
the Council had made good progress with the Community Empowerment Act but that
it needed to make the process easier to follow and accessible to all communities. The
Asset Transfer Request process is statutory and therefore has limited options to
make changes however the Asset Transfer Group have considered the Best Value
Improvement Plan and have worked to further develop the informal EOI process
simplifying  the approach for communities. This has also led to the development of a
section of the website to promote assets suitable for groups to work in partnership
with council services which will be trialled during 2022 as part of the improvement
plan actions.
4.6 Following on from the Best Value Assurance Report the Audit & Scrutiny Committee
undertook a scrutiny review of the Council’s Community Asset Transfer process. The
Panel concluded that:
 The Community Asset Transfer process is compliant with statutory
requirements.
 The process enables opportunity for engagement with community transfer
bodies.
 The process is supportive to community transfer bodies and communities. 
The review also identified a number of recommendations which have been
implemented or have been built into the processes moving forward.   
Page 303

Page 304

4 
PARTICIPATION REQUESTS 
4.7 Part 3 of the Community Empowerment (Scotland) Act 2015 provides a framework
for the use of participation requests by community bodies, with the intention of
enabling communities to have more influence over services and decisions which
affect them. Part 3 of the Act came into force on the 1st April 2017. 
4.8 In line with the requirements of the Act, the Council has put in place a procedure
which allows consideration of any requests made by community bodies. The
procedure and further information can be found on the Council’s website at
https://www.argyll-bute.gov.uk/find-out-more-about-participation-requests 
4.9 During the period 1 April 2021 to 31 March 2022, the Council received two participation
request, of which one was rejected. The Council was unable to progress the request
from Isle of Kerrera Development Trust as the outcome improvement was not within the
capacity of the Council to deliver as the ground was not in council ownership. The
request that was accepted from Garelochhead Community Council was developed in
conjunction with Police Scotland and the actions agreed were in respect of road safety
matters. 
ASSET TRANSFER AND PARTICIPATION REQUESTS - ANNUAL REPORTING
REQUIREMENTS 
4.10 Section 95 of the Community Empowerment (Scotland) Act 2015 requires the
Council to publish an annual report setting out the numbers of asset transfer
requests received and their outcomes. 
4.11 The report also requires to set out what the Council has done to 1: promote the use
of asset transfer requests and 2: support community bodies to make requests and
can be found on the Council’s asset transfer webpages here: https://www.argyll-
bute.gov.uk/asset-transfer 
4.12 Annual reports cover each year from 1 April to 31 March and must be published by
30 June. 
4.13 Section 32 of the Act also requires the Council to publish an annual report in respect of
Participation Requests setting out: 
 The number of requests received;
 The number of requests agreed and refused;
 The number of requests which resulted in changes to a public service provided by,
or on behalf of, the public service authority; and
 Any action taken by the public service authority to promote and support the use of
participation requests. 
4.14 Annual reports Participation Requests cover each year from 1 April to 31 March and
must be published by 30 June. The relevant report has been published on the
Council’s Participation webpages. 
5. CONCLUSION
5.1 This report advises the Policy and Resources Committee on the operation, of the
Page 304

Page 305

5 
processes in regard to Asset Transfer Requests and Participation Requests in terms of
the Community Empowerment Act 2015 and updates on ATR’s, EOI’s and Participation
Requests to date. 
5.2 It is recommended that the Policy and Resources Committee note the contents of the
report.  
6.  IMPLICATIONS
6.1 Policy – In line with council policy relating to Asset Transfer and Participation
Request processes.
6.2 Financial – None from annual reporting.
6.3 Legal – In line with statutory requirements of the Community Empowerment
(Scotland) Act 2015 and related Regulations.
6.4 HR – None.
6.5 Fairer Scotland Duty 
6.5.1 Equalities – Protected characteristics – None.
6.5.2 Socio economic Duty – None.
6.5.3 Islands – None
6.6 Climate change – None from annual reporting.
6.7 Risk – Failure to meet statutory requirements could have reputational
implications for the council. 
6.8 Customer Service – None. 
Douglas Hendry - Executive Director with responsibility for Commercial Services
Councillor Gary Mulvaney – Policy Lead, Finance and Commercial Services
Date: 27th June 2022 
For further information contact: 
Ross McLaughlin, Head of Commercial Services, 01436 658 914
David Allan, Estates and Property Development Manager, 01436 657 620
David Rennie, Partnerships Development Officer, 01700 501 371
Michael Nicol, Solicitor, Legal and Regulatory Services, 01546 604 468 
Page 305

Page 306

6 
Appendix 1 
Current Active Expressions of Interest (as at 31st May 2022) 
It should be noted that the Council has continued to engage with community groups who
have had EOI’s active for a significant period of time and while they remain active the
requesters have not yet moved them on. There are currently no significant actions
outstanding for the Council in relation to these. 
No Organisation Asset Summary of
Expression of
Interest
Current Status
1 Mid Argyll
Rugby Club
(MARC)
Kilmory Pony
Park show
ground
Request to lease
the ground for
development of
rugby facilities.
Terms agreed with MARC
and to be reported for
internal approval to proceed.
2 Islay
Development
Initiative
Kilarrow
Stables,
Islay
Request to acquire
the building to
convert to flats for
service workers
and community
uses.
Main building is currently
operational and part of wider
assessment of office space.
3 Kirkmichael
Community
Development
Group
Kirkmichael
Park Changing
Room
Request to lease
pavilion and
grounds for use as
an office and to
deliver wider
services.
Group are being supported
to develop their business
plan for the proposal. 
4 Barbara's
Wildlife
Rescue
Ground at
Hafton, Dunoon
Request to lease /
acquire ground for
an animal rescue
centre
Group have been seeking a
suitable site and are
assessing the feasibility of
this site.
5 Scenic
Sandbank
Former Teacher
Centre
Sandbank
Request to
purchase the site
and develop a
community garden.
Group assisted to secure an
independent valuation and
are applying to the Land
Fund to support the
acquisition of the ground.
6 South Islay
Development
Ramsay Hall Request to
purchase the
building to
redevelop the
facility and operate
the services.
Detailed plans provided by
the group require to be
assessed in conjunction with
Education and the Care
Commission as the proposal
involves a nursery use.
7 Rhu and
Shandon
Community
Centre
Rhu Community
Centre
Request for lease
to assist in
applying for
development
funding for the
building
Terms are under discussion
but the approach requires to
be consistent with other
halls / community facilities.
Page 306

Page 307

7 
8 Kilfinan
Community
Forest
Company
(KCFC)
Tighnabruaich
Primary School
Grazings
access
Request to acquire
ground to
formalise access.
Group assisted to secure an
independent valuation and
are applying to the Land
Fund to support the
acquisition of the ground.
9 Dunoon
Foodbank
Former
Dunoon
Youth
Centre,
Dunoon
Request for a
lease of the
property to
continue and
expand their
services.
Temporary Licence to
occupy granted and
upgrade works costed.
Lease to be concluded
when group established as
a SCIO.
10 Isle of Jura
Development
Trust
Picnic area at
Craighouse
Pier, Isle of
Jura
Request for a
lease of the site to
improve the
facilities and install
a container for use
as a bakery to
support local
business.
Initial stages of background
checks being undertaken.
11 The Dunoon
Project Ltd
Morag’s Fairy
Glen & Bishop’s
Glen, Dunoon
Request to acquire
the sites to support
the delivery of the
wider project and
improve the public
access and
facilities.
Initial stages of background
checks being undertaken.
Legal Services involved as
proposal involves former
reservoir.
12 Ardrishaig
Community
Food Growing
Project
King George V
Park, Ardrishaig
Request to lease
part of park as a
community food
growing area.
Initial stages of background
checks being undertaken.
13 Dunoon
Youth
Football
League
Black Park,
Dunoon
Request to take
over management
of the Black Park
area to improve
facilities
Initial stages of background
checks being undertaken. 
Page 307

Page 308

This page is intentionally left blank

Page 309

Policy and Resources Committee Work Plan 2022-23
This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. 
Date Report Title Dept/Section How Often? Date Due Comments 
11 August 2022 Financial Report Monitoring Pack  Financial Services Every meeting
except May   
Budget Outlook 23-24 to 27-28 Financial Services 
Service Annual Performance
Reviews
Customer Support
Services
Annual   
Amendment to Pensions Discretions Customer Support
Services   
UK Shared Prosperity Fund – Argyll
and Bute Investment Plan
Development and
Economic Growth  
Referred from Council 30 June
2022. 
Crown Estate and Place Based
Investment
Development and
Economic Growth   
Climate Change Board Update
Papers
Council Carbon Emissions & Climate
Investment 2022
Decarbonisation Plan Tracker &
Case Studies
Commercial
Services   
Community Empowerment
(Scotland) Act 2015 – Update –
Expressions of Interest / Asset
Transfer Requests / Reporting
Requirements
Commercial
Services   
Date Report Title Dept/Section How Often? Date Due Comments 
13 October 2022  Financial Report Monitoring Pack  Financial Services Every meeting
except May   
Budget Outlook 23-24 to 27-28 Financial Services   
Page 309
Agenda Item
12

Page 310

Policy and Resources Committee Work Plan 2022-23 
Procurement Strategy and
Sustainable Procurement Policy
Legal & Regulatory
Support   
Approach to Budget 2023-24  Financial Services   Working Group Update
Date Report Title Dept/Section How Often? Date Due Comments 
8 December
2022
Financial Report Monitoring Pack  Financial Services Every meeting
except May   
Budget Outlook 23-24 to 27-28 Financial Services 
Future Items – Date to be determined. 
Key Performance Indictors FQ2 –
2022/2023 – changing to Corporate
Outcome Indicators 
Customer Support