ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 11 AUGUST 2022
FINANCIAL REPORTS MONITORING PACK – 30 JUNE 2022
1. INTRODUCTION
1.1 This report provides a summary of the financial monitoring reports as at the end of
June 2022. There are five detailed reports, setting out the position as at 30
June 2022,  which are summarised in this Executive Summary: 
• Revenue Budget Monitoring Report
• Monitoring of Financial Risks
• Capital Plan Monitoring Report
• Treasury Monitoring Report
• Reserves and Balances
2. DETAIL
2.1 Revenue Budget Monitoring Report
2.1.1 This report provides a summary of the current revenue budget monitoring position to
ensure net expenditure is contained within budget.  It provides corporate and
departmental information with comparisons on a forecast outturn and a year to date
basis. 
2.1.2 There is no reported overall under or overspend position for the Council at June
2022.  As this is early in the financial year it is common for there to be no forecast
variances processed at this time.
2.1.3 There is a year to date underspend of £1.087m.  The year to date variances tend to
relate to the timing of income and expenditure and recharging of costs to capital. 
The financial ledger system replacement and downtime has meant that budget
profiles were unable to be refined in the first quarter of the financial year so profiling
issues are a common theme throughout the detailed departmental budget monitoring
reports. 
2.1.4 With regard to the ongoing financial impact of COVID-19, there are £9.510m of
reserves committed to manage the impact of the pandemic. The detail behind these
commitments is contained within Appendix 2 of the Reserves and Balances report.
2.1.5 Total policy savings relevant to 2022-23 financial year amount to £1.560m.  The
table below outlines their progress as at 30 June 2022.

Page 2

Category No. of
Options
2022-23
£000
2022-
23
FTE
2023-24
£000
2023-
24
FTE
Future
Years
£000
Future
Years
FTE
Delivered 5 235.0 1.4 243.0 1.4 243.0 1.4
On Track to be Delivered 12 603.5 0.5 606.5 0.5 609.5 0.5
Still to be Implemented 2 294.7 0.0 414.3 0.0 414.3 0.0
Being Developed 0 0.0 0.0 0.0 0.0 0.0 0.0
Potential Shortfall 4 402.5 0.0 402.5 0.0 402.5 0.0
Delayed 1 24.0 0.0 24.0 0.0 24.0 0.0
TOTAL 24 1,559.7 1.9 1,690.3 1.9 1,693.3 1.9 
2.1.6 For those savings approved prior to February 2022, there are four savings
categorised as having a shortfall and one currently delayed.   
Health and Social Care Partnership (HSCP) – Financial Update 
2.1.7 The forecast outturn position at the end of June is an estimated overspend of
£0.346m for 2022-23 (£0 for Social Work and £0.346m for Health).  The Chief
Financial Officer of the IJB is confident that the spend will be brought in line with
budget by the end of the financial year. 
2.2 Monitoring of Financial Risks 
2.2.1  This report outlines the process and approach developed in carrying out a financial
risks analysis and provides an update on the current assessment of financial risks.   
2.2.2 There are 6 Council wide revenue risks identified for 2022-23 currently amounting to
£3.537m.   
2.2.3 There are currently 42 departmental risks totalling £5.795m.  Of the 42 departmental
risks, one is categorised as almost certain and 5 are categorised as likely.  These
will continue to be monitored and action taken to mitigate or manage these risks.   
2.2.4 The top three risks in terms of the financial impact are noted in the table below. 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance -
Bridges, Culverts
& Sea Defences
Extreme localised weather may
result in loss of bridge, culvert ,
road or sea defence
3 750
Roads and
Infrastructure
Services
Residual Waste
H&L and Tiree
There is a potential increase to
tipping fees and haulage costs for
H&L residual waste.  The Council’s
supplier Barr Environmental
4 655

Page 3

(contract to end of 2023) lost a
tribunal relating to the
underpayment of landfill tax, which
may have led to the Council having
to source alternatives at a higher
cost.    Barr appealed the decision
which was heard in the Spring and
they won the case which should
have reduced or eliminated this
financial risk.  However, the
Scottish Government laid an
Amendment Order on Friday 1 July
2022 which came into force at 1700
on 1 July which indicates that
Landfill tax will be due on materials
previously not chargeable and we
have now received notification of
an increase in the cost which
officers are currently assessing.
Financial
Services
Council Tax Debt
Collection
Recovery
Recovery of debt becomes more
difficult to pursue in the current
economic climate.  
5 500 
2.2.5 There have been four changes to the departmental risks since the report as
presented to the Policy and Resources Committee on 24 February 2022.  These are
outlined in paragraph 3.4.1 of the Financial Risks Report. 
2.3 Capital Plan Monitoring Report 
2.3.1 This report provides a summary of the current capital plan monitoring position. 
Information is provided in terms of monitoring year to date budget, current full year
budget, future years total budget and funding and non-financial in terms of project
performance. 
2.3.2 
2.3.3
At the budget setting meeting on 25 February 2021, the Council agreed to provide a
£2.5m provision for the increase in capital contract costs as a result of COVID-19
and following agreement at the Policy and Resources Committee on 14 October
2021, this, plus a further £0.146m, was added to the capital programme. At the
budget meeting in February 2022 an additional £3.9m was set aside for further
capital contract increases including up to £1.2m for Campbeltown Flood Scheme. 
There are likely to be further financial pressures facing the capital programme that
are not able to be quantified at this stage largely relating to inflationary increases in
the construction industry and supply chain issues. 
2.3.4 Actual net expenditure to date is £3.777m compared to a budget for the year to date
of £3.765m giving rise to an overspend for the year to date of £0.012m (0.3%). The
variance results from an accumulation of non-material variances across projects.

Page 4

2.3.5 The forecast outturn for 2022-23 is a forecast net expenditure of £29.319m
compared to an annual budget of £48.555m giving rise to a forecast underspend for
the year of £19.236m (39.6%). 
2.3.6 The forecast total net projects costs on the capital plan are £177.521m compared to
a total budget for all projects of £176.387m giving rise to a forecast overspend for
the overall capital plan of £0.134m (0.08%).  
2.3.7 In respect of total project performance, there are 159 projects within the capital plan,
145 are complete or on target, 14 are off target and recoverable and no projects are
off track.  
2.4 Treasury Monitoring Report 
2.4.1 This report provides information on the current levels and recent transactions in
relation to the capital financing limit, total borrowing, temporary borrowing and long
term borrowing and investments.   
2.4.2 The net movement in external borrowing for the period 1 April 2022 to 30 June 2022
was a decrease of £10.861m. 
2.4.3 Borrowing is below the Capital Financing Requirement for the period to 30 June
2022.  At this stage in the financial year capital expenditure continues to be below
target. Due to delays as a result of the COVID-19 pandemic, capital expenditure has
been relatively low over the last twelve months. 
2.4.4 The levels of investments were £117.9m at 30 June 2022. The average rate of return
achieved was 1.351% which compares favourably with the SONIA (Sterling
Overnight Index Average) for the same period of 1.064%. 
2.5 Reserves and Balances 
2.5.1 This report summarises the overall level of reserves and balances and monitors the
spending of the earmarked reserves, providing detailed information on the unspent
budget earmarked balances.   
2.5.2 The Council has a total of £364.558m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
2.5.3 At 31 March 2022, the Council had a total of £103.626m of usable reserves.  Of this: 
• £2.682m relates to the Repairs and Renewals Fund
• £4.414m relates to Capital Funds
• £96.530m was held in the General Fund, with £89.433m of this balance
earmarked for specific purposes. 
2.5.4  Of the earmarked balance of £89.433m: 
• £46.923m is invested or committed for major initiatives/capital projects
• £37.089m is still to be drawn down in 2022-23
• £5.421m is planned to be spent in future years

Page 5

2.5.5 The table below summarises the estimated Unallocated General Fund Balance as at
the end of the financial year: 
Heading Detail £000
Unallocated General Fund
as at 31 March 2022
This is the balance that is unallocated
over and above the 2% contingency,
which amounts to £5.256m
1,841
Budgeted allocation to
General Fund for 2022-23
Budget
Per the Budget Motion at Council on 24
February 22
2,482
Current Forecast Outturn
for 2022-23 as at 30 June
2022 
0
Estimated Unallocated
balance as at 31 March
2023 
4,323 
2.5.6  It can be seen that, after taking into consideration the Budget Motion and the current
forecast outturn for 2022-23, the Council is forecast to have a £4.323m surplus over
contingency. 
2.6 VIREMENTS OVER £0.200m (Revenue) 
2.6.1 Virement is the process of transferring budget between cost centres, services or
departments or between capital projects.  The Council’s constitution notes that
virements over £0.200m require approval by Council.  This section of the report will
be used to outline revenue virements in the period that require approval.   Capital
virements are included within the capital monitoring report. 
2.6.2 For the periods April to June 2022, there are no virements requiring authorisation.   
3.  RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee: 
a) Consider the revenue budget monitoring report as at 30 June 2022 
b) Note the financial risks for 2022-23 
c) Note the capital plan monitoring report as at 30 June 2022 and approve the
proposed changes to the capital plan outlined in Appendix 4 of that report. 
d) Note the treasury monitoring report as at 30 June 2022

Page 6

e) Consider the reserves and balances report as at 30 June 2022  
f) Note there are no revenue virements over £0.200m between April and June 2022 
4. IMPLICATIONS 
4.1 Policy – None.
4.2 Financial -  Outlines the revenue and capital monitoring for
2022-23 as at 30 June 2022.
4.3 Legal -  None.
4.4 HR -  None.
4.5 Fairer Scotland Duty -   None.
4.5.1 Equalities – protected
characteristics - 
None.
4.5.2 Socio-economic Duty -  None.
4.5.3 Islands -  None.
4.6 Climate Change - None.
4.7 Risk -  Risks are included in financial risks report. 
4.8 Customer Service -  None. 
Kirsty Flanagan
Section 95 Officer
8 July 2022 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 7

REVENUE BUDGET MONITORING REPORT AS AT 30 JUNE 2022 POLICY & RESOURCES COMMITTEE
12 AUGUST 2022 
2022-23 Overall Position:
There is no reported forecast under or overspend position for the Council at this time.  It is common for there to be no forecast variances
reported this early in the financial year. 
There is a year to date underspend of £1.087m.  The year to date variances within the departments tend to relate to the timing of income and
expenditure and recharging of costs to capital.  The system replacement and downtime has meant that budget profiles were unable to be
refined in the first quarter of the financial year so profiling issues are a common theme through the detailed reports which follow.   
Key Highlights as at June 2022:
•  The Oracle Fusion system implementation has impacted the year to date position noted for June 2022 as budget profiles were unable
to be refined in the first quarter of the financial year.  The implementation is progressing well and the issues with profiling will be
resolved by the next reporting period. 
Key Financial Successes:
Performance against budget for 2021-22 was an overall net favourable position of £1.630m underspend after adjusting for year-end
earmarking.  This breaks down as: 
• £0.815m net underspend in relation to Council service departmental expenditure
• £0.432m net overspend in relation to other central costs
• £1.247m over-recovery of Council Tax income.   
Key Financial Challenges: Proposed Actions to address Financial Challenges:
Ongoing consideration of the financial impact of COVID on the Council’s
revenue position. 
Continue to identify additional costs as a consequence of COVID to
ensure earmarked COVID funds are applied appropriately. 
Achieving a favourable year-end balanced position and achieving
savings targets in light of council wide risks to expenditure. 
Robust monitoring of the financial position and delivery of savings to
ensure budget issues inform the budget monitoring process.
Monitoring Social Work expenditure and more widely the IJB position as
any overspend will transfer back to partner bodies, in the first instance.  
Continue to work closely with the CFO of the IJB to ensure that early
indication of any potential adverse financial outturn is known and
corrective action is agreed as appropriate to reduce the risk to the
Council. 
Identifying further savings and delivering services more efficiently with
less resources, as whilst a balanced 2022-23 budget was agreed in
February 2022 there are still budget gaps in future years
The Council will continue to progress savings options identified in
2021-22 that require further development and seek to identify further
savings through themed reviews and business process reviews.

Page 8

Maintaining or improving the level of service income recovered, for
example planning, building standards and car parking.  
Actively monitor income recovery and ensure Council fees and
charges policies are reviewed. 
Managing spend in service areas which are demand led and, to some
extent, outwith service control, for example Winter Maintenance. 
Use risk based approach to budget monitoring to focus additional
attention on these areas.
Ongoing requirement to fund unavoidable inflationary increases in areas
like utility costs, fuel, food etc. This is impacted further by the availability
of supply as a result of the COVID-19 pandemic, UK exit from the
European Union, invasion of Ukraine and sanctions on Russian owned
entities to name a few influencing factors.
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be reported through the budget monitoring
and preparation processes. 
Cost of living crisis impacting on pay inflation negotiations which could
result in pay awards above what is deemed affordable.
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be reported through the budget monitoring
and preparation processes. 
Forecast Outturn Position
There is no forecast projection for 2022-23 as at the end of June 2022.
Department
Annual
Budget   
£'000
Forecast
Outturn   
£'000
Current
Forecast
Variance
£'000
Previous
Forecast
Variance
£000
Change
£000 Explanation
Chief Executive's Unit 5,925 5,925 0 0 0
Executive Director (Douglas Hendry) 122,282 122,282 0 0 0
Executive Director (Kirsty Flanagan) 44,121 44,121 0 0 0
Social Work 72,911 72,911 0 0 0
Central Budgets 23,887 23,887 0 0 0
Financed By (269,126) (269,126) 0 0 0
Total 0 0 0 0 0
Current Forecast Outturn Variance with change from previous month
No forecast variances reported for any department as at June 2022

Page 9

(2,000)
(500)
1,000
April
May
June
July
August
September
October
November
December
January
February
£ 000
Movement in the forecast outturn position for each Department from the start of the
financial year
Chief Executive's Unit Executive Director (Kirsty Flanagan)
Social Work Central Budgets
Executive Director (Douglas Hendry)
Underspend
Overspend

Page 10

Year to Date Position
The year to date position as at the end of June 2022 is an underspend of £1.087m and the main variances are noted below. 
Department
YTD
Actual
£'000
YTD
Budget
£'000
YTD
Variance   
£'000
Explanation
Chief Executive's Unit 1,423 1,290 (133)
Executive Director (Douglas Hendry) 30,853 31,835 982
Executive Director (Kirsty Flanagan) 10,313 8,602 (1,711)
Social Work 14,629 17,447 2,818
Central Budgets 276 2,406 2,130
Funding (64,811) (67,810) (2,999)
Total Net Expenditure (7,317) (6,230) 1,087
The year to date variance is largely due to profiling of budgets as opposed to
genuine under or over spends. This will be rectified in the coming weeks once the
new financial ledger system is fully implemented

Page 11

0%
25%
50%
75%
100%
Chief
Executive's
Unit
Executive
Director
(Kirsty
Flanagan)
Executive
Director
(Douglas
Hendry)
Social W
ork
Central
Budgets
TOTAL
Expenditure to date against the remaining budget for each
Department
YTD Actual Remaining Budget 
Further information on the departmental year to date variances is included later on in the report.

Page 12

OBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 30 JUNE 2022
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual Budget Forecast
Outturn
Forecast
Variance
Variance
£'000 £'000 £'000 % £'000 £'000 £'000 %
Departmental Budgets
Chief Executive's Unit 1,423 1,290 (133) (10.3%) 5,925 5,925 0 0.0%
Executive Director (Kirsty Flanagan) 10,313 8,602 (1,711) (19.9%) 44,121 44,121 0 0.0%
Executive Director (Douglas Hendry) 30,853 31,835 982 3.1% 122,282 122,282 0 0.0%
Social Work 14,629 17,447 2,818 16.2% 72,911 72,911 0 0.0%
Total Departmental Budgets 57,218 59,174 1,956 3.3% 245,239 245,239 0 0.0%
Central Budgets
Other Operating Income and Expenditure (562) 431 993 230.4% 1,988 1,988 0 0.0%
Joint Boards 313 374 61 16.3% 1,496 1,496 0 0.0%
Non-Controllable Costs 525 1,601 1,076 67.2% 20,403 20,403 0 0.0%
Total Central Budgets 276 2,406 2,130 88.5% 23,887 23,887 0 0.0%
TOTAL NET EXPENDITURE 57,494 61,580 4,086 6.6% 269,126 269,126 0 0.0%
Financed By
Aggregate External Finance (53,856) (53,994) (138) 0.3% (216,346) (216,346) 0 0.0%
Local Tax Requirement (10,955) (13,816) (2,861) 20.7% (55,262) (55,262) 0 0.0%
Contributions to General Fund 0 0 0 0.0% 2,482 2,482 0 0.0%
Earmarked Reserves 0 0 0 0.0% 0 0 0 0.0%
Total Funding (64,811) (67,810) (2,999) 4.4% (269,126) (269,126) 0 0.0%
(Deficit)/Surplus for Period (7,317) (6,230) 1,087 0 0 0
CURRENT PROJECTED FINAL OUTTURNYEAR TO DATE POSITION

Page 13

SUBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 30 JUNE 2022
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual
Budget
Forecast
Outturn
Forecast
Variance
Variance
£'000 £'000 £'000 % £'000 £'000 £'000 %
Subjective Category
Employee Expenses 35,945 37,580 1,635 4.4% 167,294 167,294 0 0.0%
Premises Related Expenditure 2,234 3,886 1,652 42.5% 16,491 16,491 0 0.0%
Supplies and Services 4,836 5,762 926 16.1% 20,950 20,950 0 0.0%
Transport Related Expenditure 2,881 2,916 35 1.2% 17,004 17,004 0 0.0%
Third Party Payments 29,753 40,835 11,082 27.1% 163,668 163,668 0 0.0%
Capital Financing (157) 0 157 14,289 14,289 0 0.0%
TOTAL EXPENDITURE 75,492 90,979 15,487 17.0% 399,696 399,696 0 0.0%
Income (82,810) (97,210) (14,400) 14.8% (399,696) (399,696) 0 0.0%
(Deficit)/Surplus for Period (7,317) (6,230) 1,087 0 0 0
YEAR TO DATE POSITION CURRENT PROJECTED FINAL OUTTURN
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget.

Page 14

CHIEF EXECUTIVE’S UNIT – AS AT 30 JUNE 2022 
The department is currently forecasting spend in line with budget. 
The department has a year to date overspend of £0.133m (10.3%) which can be attributed to profiling issues.   
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Chief Executive 894 894 0 0 0
Head of Financial Services 5,031 5,031 0 0 0
Totals 5,925 5,925 0 0 0
Year to Date Position 
0%
25%
50%
75%
100%
Chief Executive Head of Financial Services
Expenditure to date against the remaining budget for each
Service
YTD… Remaining Budget…
Key Financial Successes:
• The department is currently forecasting that spend will be in line with budget for 2022-23. 
• All savings options have been delivered.  
• The department’s 2021-22 outturn position was an underspend of £0.018m.  This resulted from an overall underspend of £2.013m
offset by earmarking of £1.769m due to auto-carry forwards including unspent grants and COVID-19 funding and £0.226m of unspent
budget earmarkings. 
Key Financial Challenges: Proposed Actions to address Financial Challenges:
To continue to deliver a high quality support service function during a time
of substantial uncertainty and challenge arising from continuing reductions
in funding whilst costs are increasing due to high inflation and service
Ensure the team is operating as efficiently and effectively as
possible to enable continued support to departments with reduced
resources by building resilience through knowledge sharing across

Page 15

demand caused by world events including the COVID-19 pandemic and
the conflict in Ukraine.
the team and maximising the benefits to the service from the
implementation of the Oracle Fusion Financial Ledger System. 
Carry out a business process review of the Revenues and Benefits
function to determine if there is scope to deliver the service in a more
cost effective manner. 
Work collaboratively with other services of the Council to identify
opportunities to improve the operational and financial efficiency of
services and to support evidence based decision making.

Page 16

CHIEF EXECUTIVE’S UNIT – OBJECTIVE SUMMARY AS AT 30 JUNE 2022 
Service Area YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Executive 65 68 3 4.4% 327 327 0 0.0% Outwith reporting criteria
Community Planning &
Development 158 124 (34) (27.4%) 567 567 0 0.0%
Profile related overspend on third party
payments partially offset by unbudgeted
income.  
223 192 (31) (16.2%) 894 894 0 0.0%  
Accounting &
Budgeting 580 468 (112) (23.9%) 2,138 2,138 0 0.0%
Overspend caused by profiling issues on
income budgets (will be rectified July) and
spend for which earmarkings require to be
drawn down
Internal Audit & Fraud 54 49 (5) (10.2%) 252 252 0 0.0%
Overspend caused by profiling issues on
income budgets (will be rectified July)
partially offset by underspend in staffing due
to vacancy
Revenues & Benefits (17) 447 464 103.8% 2,093 2,093 0 0.0%
Underspend from Housing Benefits Private
which is normally reprofiled to avoid large
variances due to the nature of the cost centre
- this was not possible in June due to the new
financial system implementation
Scottish Welfare Fund 583 134 (449) (335.1%) 548 548 0 0.0%
Profile related overspend on third party
payments and income accrued but not yet
received in  
1,200 1,098 (102) (9.3%) 5,031 5,031 0 0.0%    
1,423 1,290 (133) (10.3%) 5,925 5,925 0 0.0%

Page 17

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 18

CHIEF EXECUTIVE’S UNIT – SUBJECTIVE SUMMARY AS AT 30 JUNE 2022
Subjective Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 1,057 1,071 14 1.3% 5,031 5,031 0 0.0% Outwith reporting criteria
Premises 0 0 0 0.0% 0 0 0 0.0% Outwith reporting criteria
Supplies and Services 145 140 (5) (3.6%) 579 579 0 0.0% Outwith reporting criteria
Transport 2 8 6 75.0% 32 32 0 0.0% Underspends on staff travel budgets
Third Party 4,637 6,241 1,604 25.7% 24,962 24,962 0 0.0% Profiling issues on Housing Benefits Private budget
Income (4,418) (6,170) (1,752) 28.4% (24,679) (24,679) 0 0.0% Profiling issues on Housing Benefits Private budget
Totals 1,423 1,290 (133) (10.3%) 5,925 5,925 0 0.0%
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 19

CHIEF EXECUTIVE’S UNIT – RED VARIANCES AS AT 30 JUNE 2022 
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
0 0.0% 
A red variance is a forecast variance which is greater than +/- £50,000.

Page 20

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – AS AT 30 JUNE 2022 
The department is currently forecasting spend in line with budget.  It is common for there to be no forecast variances reported this early in the
financial year.
The department has a year to date (YTD) underspend of £0.982m (3.1%).  The year to date underspend position is mainly due to budget
profiling which will be refined through July 2022 once the new financial ledger system is fully functional.   
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Executive Director
(Douglas Hendry) (61) (61) 0 0 0
Head of Commercial
Services 9,645 9,645 0 0 0
Head of Education 93,648 93,648 0 0 0
Head of Legal and
Regulatory Support 19,050 19,050 0 0 0
Totals 122,282 122,282 0 0 0
Year to Date Position 
Key Financial Successes:
The 2021-22 year-end consolidated outturn position was an under spend of £0.223m after adjusting for earmarkings. This was due to the
effective contract management of NPDO and Hub Schools contracts, including a lower than expected insurance premium as a result of the
annual renegotiation of insurance costs. Also the costs of COVID were contained and minimised where possible across departments with staff
from all areas of the service assisting in planning, implementing and delivering a wide range of additional services in schools and communities
and helping businesses through the return from lockdown. 
0%
25%
50%
75%
100%
Executive Director
(Douglas Hendry)
Head of
Commercial
Services
Head of Education Head of Legal and
Regulatory Support
Expenditure to date against the remaining budget for each
Service
YTD… Remaining Budget…

Page 21

Key Financial Challenges: Proposed Actions to address Financial Challenges:
The ongoing impact of COVID-19 Costs are being contained where possible. 
Impact of numbers/uptake in demand led service areas like catering,
design services and licensing.
Continually refine/develop systems to accurately calculate forecast
outturns and the impact on the future financial outlook.
Manage the impact of the Statutory Guidance supporting Nutritional
Requirements for Food and Drink in Schools (Scotland) Regulations
2020, on the cost of producing school meals and also the uptake.
Monitor and report on the impact on costs and on income as the
year progresses.
Support longer term service re-design project for Catering and Cleaning
services to ensure efficiencies and financial savings are secured for the
Council as well as delivery of free school meals for 1140 hours of Early
Learning and Childcare and the phased universal free school meals
expansion in Primary Schools. 
Effective working with partners and support with implementation of
service delivery method. Continual monitoring and review of
budgets.
Legislative/policy requirements not fully funded by Scottish Government
which may put additional burdens on the Council. For example, the
introduction of free school meal payments for holidays.
Analysis of new obligations and whether they incur additional costs
not met through increased grant.
The Council has a requirement to deliver 1140 hours of Early Learning
and Childcare. The initial funding from Scottish Government was based
on individual implementation plans with funding confirmed up to March
2022. The ring fenced grant has been reduced in 2022-23 and an
exercise is required to ensure that the service can be delivered efficiently
and effectively within this reduced funding allocation.
Robust service costings, financial monitoring and timely reporting
to ensure the service can continue to deliver the service within the
financial resources available. 
Impact of high inflationary uplifts within the NPDO/HUB School contracts. Ensuring continued effective contract management of NPDO/HUB
Schools to minimise the impact of high inflationary uplifts.

Page 22

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – OBJECTIVE SUMMARY AS AT 30 JUNE 2022
Service Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director
(Douglas
Hendry)
Central/Management
Costs 70 69 (1) (1.5%) (61) (61) 0 0.0% Outwith Reporting Criteria    
70 69 (1) (1.5%) (61) (61) 0 0.0%  
Head of
Commercial
Services
Catering (58) 125 183 146.4% 1,110 1,110 0 0.0%
The YTD underspend of £183k
is due to the profiling of the
catering purchases budget, this
will be refined through July. 
Head of
Commercial
Services
Central/Management
Costs 230 207 (23) (11.1%) 950 950 0 0.0%
The YTD overspend of £23k is
due to profiling of Our Modern
Workspace budget which will be
refined through July. 
Head of
Commercial
Services
CHORD 47 (5) (52) 1040.0% 20 20 0 0.0%
The YTD overspend of £52k is
due to the profiling of Income
which will be refined through
July.
Head of
Commercial
Services
Cleaning (43) 31 74 238.7% 417 417 0 0.0%
The YTD underspend of £74k is
due to the profiling of staffing
budgets which will be rectified in
July.
Head of
Commercial
Services
Culture, Heritage,
Recreation & Sport 1,420 1,459 39 2.7% 5,812 5,812 0 0.0% Outwith Reporting Criteria

Page 23

Head of
Commercial
Services
Events &
Commercial
Catering
41 (15) (56) 373.3% (22) (22) 0 0.0%
The YTD overspend of £56k is
partially due to an under
recovery of income from events
and profiling which will be
refined through July.
Head of
Commercial
Services
Property Portfolio (93) (49) 44 (89.8%) (194) (194) 0 0.0%
The YTD underspend of £44k is
due to the profiling of rental
income and surplus property
budgets.  These will be refined
through July.
Head of
Commercial
Services
Property Services 495 61 (434) (711.5%) 500 500 0 0.0%
The YTD overspend of £434k is
due to the profiling of internal
property fees, this profile will be
rectified in July.
Head of
Commercial
Services
Shared Offices 204 325 121 37.2% 1,052 1,052 0 0.0%
The YTD underspend is due to
the timing of the central repairs
invoicing and utilities profiling,
both of which will be rectified
through July.    
2,243 2,139 (104) (4.9%) 9,645 9,645 0 0.0%  
Head of
Education
Additional Support
for Learning 2,099 2,342 243 10.4% 9,874 9,874 0 0.0%
The YTD underspend of £243k
is due to profiling of staffing
budgets and third party payment
budgets.  All will be refined
through July.
Head of
Education
Central/Management
Costs 434 437 3 0.7% 1,476 1,476 0 0.0% Outwith Reporting Criteria
Head of
Education
Community Learning
& Development (7) 2 9 450.0% 10 10 0 0.0%
The YTD underspend of £9k is
profile related and will be
rectified in July.

Page 24

Head of
Education COVID 242 0 (242) 0.0% 414 414 0 0.0%
The YTD overspend of £242k is
mainly due to the profiling of
Covid Hardship Funding
payments which will be rectified
in July.
Head of
Education
Early Learning &
Childcare 3,182 4,606 1,424 30.9% 8,324 8,324 0 0.0%
The YTD underspend of
£1.424m is due to profiling of
Employee, Third Party
Payments and Income Budgets.
Some alignment of staffing
budgets is also required.   
Head of
Education Primary Education 8,458 8,261 (197) (2.4%) 34,433 34,433 0 0.0%
The YTD overspend of £197k is
due to profiling issues with
Employee Budgets and Catering
Income budgets.  All will be
refined through July. There are
also a number of budget
adjustments required to align
covid funding to current spend
that will be processed in July.
Head of
Education Pupil Support 448 536 88 16.4% 2,169 2,169 0 0.0%
The YTD underspend is due to
profiling issues with Employee
budgets, Third Party Payment
Budgets and Government
Grants.  All will be refined
through July.
Head of
Education
Schools - Central
Services 544 625 81 13.0% 2,665 2,665 0 0.0%
The YTD underspend of £81k is
mainly due to profiling of
Employee, Supplies and
Services and Income Budgets
which will be refined through
July. There is an overspend of
£15k in Education Licenses and
budget will require to be
identified from within the service
to fund this overspend.

Page 25

Head of
Education
Secondary
Education 6,910 7,944 1,034 13.0% 34,283 34,283 0 0.0%
The YTD underspend of
£1.034m is mainly due to
profiling issues with Employee
Expenses and Income budgets
which will be refined through
July. £439k of this underspend
is accrued expenditure for SQA
Exam Fees that will be
eliminated when the invoice is
received and paid. There are
also a number of budget
adjustments required to align
Covid funding to current spend
that will be processed in July. 
22,310 24,753 2,443 9.9% 93,648 93,648 0 0.0%  
Head of
Legal &
Regulatory
Support
Central/Management
Costs 49 55 6 10.9% 258 258 0 0.0%
The YTD underspend of £6k is
due to profiling issues that will
be refined through July.
Head of
Legal &
Regulatory
Support
Community Safety 39 35 (4) (11.4%) 161 161 0 0.0%
The YTD overspend of £4k is
due to profiling issues that will
be rectified through July.
Head of
Legal &
Regulatory
Support
Elections 65 95 30 31.6% 386 386 0 0.0%
The YTD underspend of £30k is
due to profiling issues that will
be rectified through July.
Head of
Legal &
Regulatory
Support
Governance 163 169 6 3.6% 784 784 0 0.0% Outwith Reporting Criteria
Head of
Legal &
Regulatory
Support
Governance, Risk &
Safety 109 115 6 5.2% 542 542 0 0.0% Outwith Reporting Criteria

Page 26

Head of
Legal &
Regulatory
Support
Legal Services 150 131 (19) (14.5%) 677 677 0 0.0%
The YTD overspend of £19k is
due to profiling of Employee and
Income Budgets which will be
rectified through July.
Head of
Legal &
Regulatory
Support
NPDO and Hub
Schools 5,171 3,910 (1,261) (32.3%) 14,512 14,512 0 0.0%
The YTD overspend of £1.261m
is due to the profiling of Income
Budgets and will be rectified
through July.
Head of
Legal &
Regulatory
Support
Procurement,
Commisioning and
Contracts
212 238 26 10.9% 1,132 1,132 0 0.0%
The YTD underspend of £26k is
partly due to staff vacancies and
also profiling of Employee
Budgets which will be refined
through July.
Head of
Legal &
Regulatory
Support
Trading Standards &
Advice Services 272 126 (146) (115.9%) 598 598 0 0.0%
The YTD overspend is mainly
due to payments being made to
advice services that will be
rectified by drawing down funds
held in earmarked reserves.    
6,230 4,874 (1,356) (27.8%) 19,050 19,050 0 0.0%      
30,853 31,835 982 3.1% 122,282 122,282 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 27

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – SUBJECTIVE SUMMARY AS AT 30 JUNE 2022
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 20,877 21,793 916 4.2% 93,452 93,452 0 0.0%
Non-Education: YTD underspend of £137k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Education: YTD underspend of £779k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Premises 1,487 1,683 196 11.7% 7,207 7,207 0 0.0%
Non-Education: YTD underspend of £146k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Education: YTD underspend of £50k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Supplies and
Services 2,396 2,919 523 17.9% 10,276 10,276 0 0.0%
Non-Education: YTD underspend of £299k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Education: YTD underspend of £223k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Transport 73 64 (9) (14.1%) 256 256 0 0.0%
Non-Education: YTD underspend of £6k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Education: YTD overspend of £15k due to profiling, budget required to be profiled across department
in line with anticipated spend and will be rectified in July.
Third Party 7,904 10,154 2,250 22.2% 39,250 39,250 0 0.0%
Non-Education: YTD underspend of £120k due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July.
Education: YTD underspend of £2.129m due to profiling, budget required to be profiled across
department in line with anticipated spend and will be rectified in July. Also £439k accrued expenditure
for SQA Exams which will be eliminated when invoice received from SQA.
Income (1,884) (4,778) (2,894) 60.6% (28,159) (28,159) 0 0.0%
Non-Education: YTD overspend of £2.171m due to profiling, budget required to be profiled across
department in line with anticipated receipt of income and will be rectified in July.
Education: YTD underspend of £0.722m due to profiling, budget required to be profiled across
department in line with anticipated receipt of income and will be rectified in July.
Totals 30,853 31,835 982 3.1% 122,282 122,282 0 0.0%
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 28

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – RED VARIANCES AS AT 30 JUNE 2022 
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
A Red variance is a forecast variance which is greater than +/- £50,000.

Page 29

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – AS AT 30 JUNE 2022 
The department is currently forecasting spend in line with budget.  It is common for there to be no forecast variances reported this early in the
financial year.   
The department has a year to date overspend of £1.711m (19.9%).  This is mainly due to profiling adjustments which will be refined through
July 2022 once the new financial ledger system is fully functional. These profiling adjustments largely relate to income budgets within Roads
and Marine services.  
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Executive Director (Kirsty
Flanagan) (270) (270) 0 0 0
Head of Customer Support
Services 8,152 8,152 0 0 0
Head of Development and
Economic Growth 7,710 7,710 0 0 0
Head of Roads and
Infrastructure Services 28,529 28,529 0 0 0
Totals 44,121 44,121 0 0 0
Year to Date Position 
Key Financial Successes:
At the end of financial year 2021-22 the department showed an overall underspend of £0.574m after taking into account all earmarkings. The
main underspends were due to the over-recovery of vacancy savings, additional income in Environmental Health from Private Water Supply
Appraisals and additional Planning Fee income which was partially offset by the under-recovery of Building Warrant income. Overall there was
a favourable net position. 
-95%
-70%
-45%
-20%
5%
30%
55%
80%
105%
Executive Director
(Kirsty Flanagan)
Head of Customer
Support Services
Head of
Development and
Economic Growth
Head of Roads and
Infrastructure
Services
Expenditure to date against the remaining budget for each
Service
YTD… Remaining Budget…

Page 30

Key Financial Challenges: Proposed Actions to address Financial Challenges:
The impact of COVID-19 Costs are being contained where possible. 
Department / Service ongoing ability to meet future savings / efficiency
requirements.
Monitoring of trends / expenditure levels / service configuration and
the Service Packages Policy Options savings process.
Dangerous buildings as there is no budget for this expenditure and the
council has no control over the demand for the service.   
Building Standards, Legal Services and Financial Services are
working closely to manage debt recovery and to consider other
options to minimise corporate risk exposure.  
Due to the nature of the various components of Waste Management there
are ongoing challenges with:
• The introduction of the Deposit Return Scheme
• Uncertainty with recycling income/ gate fee costs due to the           
volatility of the market
• Challenges in the legislative changes around the disposal of      
Biodegradable Municipal Waste 
To closely monitor all service components of Waste Management
and review the Waste Strategy in conjunction with our contractual
partner Renewi (previously Shanks).
Winter Maintenance costs are difficult to estimate as they are very much
dependant on the weather.  
Close monitoring of Winter Maintenance and reporting of the
financial implications through the budget monitoring process. The
Council agreed the winter policy, setting out the intervention level
and locations to be treated.  The number of treatments is determined
by weather conditions. The current budget provision provides for 58
full equivalent runs. There is a sophisticated weather monitoring
system in place consisting of several weather stations, this is
supported by a forecasting and metrological service which is
collaboratively procured by West of Scotland local authorities.
Rising cost of materials across the service will result in a reduction in
activity or overspends. Specifically there have been significant increases
in the price of salt and bitumen in recent months.
Costs are monitored regularly and contained as much as possible,
with any unavoidable overspends highlighted as soon as known.

Page 31

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 30 JUNE 2022
Service
Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director (Kirsty
Flanagan)
Central/Management
Costs 52 53 1 1.9% (270) (270) 0 0.0% Outwith Reporting Criteria    
52 53 1 1.9% (270) (270) 0 0.0%  
Head of
Customer
Support
Services
Central/Management
Costs 29 36 7 19.4% 166 166 0 0.0%
Profile of budget in payments to
other bodies needs to be profiled
in line with planned expenditure
timings.
Head of
Customer
Support
Services
Communications 18 65 47 72.3% 306 306 0 0.0%
Bord na Gaidhlig income
received in advance of
expenditure.
Head of
Customer
Support
Services
Customer Service
Centres 268 294 26 8.8% 1,321 1,321 0 0.0% Outwith Reporting Criteria
Head of
Customer
Support
Services
HR 418 485 67 13.8% 2,287 2,287 0 0.0%
Vacancies in Performance
Management - vacancy savings
not yet processed.
Head of
Customer
Support
Services
ICT 584 882 298 33.8% 3,994 3,994 0 0.0%
Profile of budgets in supplies and
services needs to be profiled in
line with planned expenditure
timings.
Head of
Customer
Support
Services
Registrars (37) 3 40 1333.3% 78 78 0 0.0%
Vacancy savings have not yet
been taken and income profile
needs to be adjusted.    
1,280 1,765 485 27.5% 8,152 8,152 0 0.0%  
Head of
Development &
Economic
Growth
Airports 330 268 (62) (23.1%) 1,163 1,163 0 0.0%
Private contractor budget needs
to be profiled in line with
anticipated expenditure.
Head of
Development &
Economic
Growth
Building Control (103) 1 104 10400.0% (108) (108) 0 0.0%
Income currently ahead of
budget profile which will be
closely monitored over the
coming months.
Head of
Development &
Central/Management
Costs 96 122 26 21.3% 574 574 0 0.0% Budget profile needs to be
amended.

Page 32

Economic
Growth
Head of
Development &
Economic
Growth
Culture & Heritage 17 49 32 65.3% 216 216 0 0.0%
Budget for Rothesay Pavilion not
currently needed - will be profiled
for future monitoring.
Head of
Development &
Economic
Growth
Development
Management (137) 3 140 4666.7% 238 238 0 0.0% Planning Fee income currently
ahead of profile.
Head of
Development &
Economic
Growth
Development Policy 72 80 8 10.0% 379 379 0 0.0%
Subscription budgets need to be
profiled in line with anticipated
expenditure.
Head of
Development &
Economic
Growth
Economic
Development (209) 272 481 176.8% 1,038 1,038 0 0.0%
Income for Islands Infrastructure
Fund received in advance of
payments.
Head of
Development &
Economic
Growth
Environmental
Health 187 233 46 19.7% 1,284 1,284 0 0.0%
Income for Private Water Supply
Appraisal currently ahead of
budget profile which will be
closely monitored over the
coming months.
Head of
Development &
Economic
Growth
Environmental
Initiatives 44 24 (20) (83.3%) 114 114 0 0.0% Profile of third party payment.
Head of
Development &
Economic
Growth
Housing 1,397 951 (446) (46.9%) 2,593 2,593 0 0.0%
Expenditure payments for
HEEPS incurred prior to grant
income being received.
Head of
Development &
Economic
Growth
Transportation
Policy 13 49 36 73.5% 219 219 0 0.0% CWSS income received in
advance of expenditure.    
1,707 2,052 345 16.8% 7,710 7,710 0 0.0%  
Head of Roads
& Infrastructure
Services
Amenity 802 684 (118) (17.3%) 2,792 2,792 0 0.0%
Income budget requires to be
profiled in line with anticipated
income timings.
Head of Roads
& Infrastructure
Services
Car Parking (98) (166) (68) 41.0% (619) (619) 0 0.0%
Income budget requires to be
profiled in line with anticipated
income timings.

Page 33

Head of Roads
& Infrastructure
Services
Central/Management
Costs 652 635 (17) (2.7%) 2,896 2,896 0 0.0% Outwith Reporting Criteria
Head of Roads
& Infrastructure
Services
Depots 94 (91) (185) 203.3% (469) (469) 0 0.0%
Income budget requires to be
profiled in line with anticipated
income timings.
Head of Roads
& Infrastructure
Services
Fleet & Transport 2,191 727 (1,464) (201.4%) 8,260 8,260 0 0.0%
Income budget requires to be
profiled in line with anticipated
income timings.
Head of Roads
& Infrastructure
Services
Infrastructure 85 142 57 40.1% 720 720 0 0.0%
Coastal and Flood budget
requires to be profiled in line with
anticipated expenditure.
Head of Roads
& Infrastructure
Services
Marine (293) (1,515) (1,222) 80.7% (4,371) (4,371) 0 0.0%
Income behind budget profile -
profile will be amended and
income levels closely monitored.
Head of Roads
& Infrastructure
Services
Network & Traffic
Management 55 25 (30) (120.0%) 166 166 0 0.0%
Income behind budget profile -
profile will be amended and
income levels closely monitored.
Head of Roads
& Infrastructure
Services
Road Safety 20 38 18 47.4% 178 178 0 0.0% Vacancy savings not yet been
taken.
Head of Roads
& Infrastructure
Services
Roads & Lighting 2,702 1,282 (1,420) (110.8%) 6,143 6,143 0 0.0%
Income budget requires to be
profiled in line with anticipated
income timings.
Head of Roads
& Infrastructure
Services
Waste 1,064 2,971 1,907 64.2% 12,833 12,833 0 0.0%
Income ahead of budget profile -
profile will be looked and income
levels monitored closely.    
7,274 4,732 (2,542) (53.7%) 28,529 28,529 0 0.0%      
10,313 8,602 (1,711) (19.9%) 44,121 44,121 0 0.00%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 34

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – SUBJECTIVE SUMMARY AS AT 30 JUNE 2022 
Subjective Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 7,084 7,560 476 6.3% 35,352 35,352 0 0.0%
Vacancy savings have not yet been taken for vacant posts
throughout the department.  Budget for overtime needs to be
profiled in line with anticipated expenditure i.e. winter months.
Premises 575 746 171 22.9% 2,990 2,990 0 0.0%
Depot recharge budget needs profiled in line with anticipated
expenditure and current underspend in CRA budgets across the
department.
Supplies and Services 1,772 1,990 218 11.0% 8,061 8,061 0 0.0% Profile of budgets in ICT needs to be profiled in line with
planned expenditure timings.
Transport 2,679 2,676 (3) (0.1%) 15,837 15,837 0 0.0% Outwith Reporting Criteria.
Third Party 6,817 8,533 1,716 20.1% 35,828 35,828 0 0.0%
Budget requires to be profiled in Waste and Roads and Lighting
Holding Account, and across the department, in line with
anticipated expenditure timings.
Capital Financing 0 0 0 0.0% 1,591 1,591 0 0.0% Outwith Reporting Criteria.
Income (8,614) (12,903) (4,289) 33.2% (55,538) (55,538) 0 0.0%
Budget for Roads Operational Holding Accounts needs profiled
in line with anticipated income timings (£2,239k).  Accruals for
HEEPS income still outstanding (£705k).  Public transport
income needs profiled in line with anticipated income timings
(£1,285k)
Totals 10,313 8,602 (1,711) (19.9%) 44,121 44,121 0 0.0%

Page 35

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 36

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – RED VARIANCES AS AT 30 JUNE 2022
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation             
A red variance is a forecast variance which is greater than +/- £50,000.

Page 37

SOCIAL WORK – AS AT 30 JUNE 2022 
The department is currently forecasting spend in line with budget. 
The department has a year to date underspend of £2.818m (16.2%). This is mainly due to a large number of budget profile adjustments across
Social Work that will be refined through July 2022 once the new financial ledger system is fully functional. 
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Chief Officer Integration 1,982 1,982 0 0 0
Head of Adult Services 55,089 55,089 0 0 0
Head of Children and Families 15,387 15,387 0 0 0
Head of Strategic Planning and
Performance 453 453 0 0 0
Totals 72,911 72,911 0 0 0
Year to Date Position 
0%
25%
50%
75%
100%
Chief Officer
Integration
Head of Adult
Services
Head of Children
and Families
Head of
Strategic
Planning and
Performance
Expenditure to date against the remaining budget
for each Service
YTD… Remaining Budget…
Key Financial Successes:
Delivered an underspend at the end of 2021/22 after automatic earmarkings and full repayment of £2.759m of debt owed to the Council for
prior year deficits. This should allow for future investment and transformation across Social Work with prior year deficits now fully repaid.

Page 38

Key Financial Challenges: Proposed Actions to address Financial Challenges:
Deliver the outstanding savings total for 2022/23 of £966k (as at June
2022).
Maintain a close working relationship with the HSCP Service
Improvement Team in order to quickly and efficiently identify and
assess options for delivering the outstanding savings.
Development and delivery of future service redesigns which will be
necessary to contain service expenditure within the allocated resource in
the medium to long term.
Support from finance to assist strategic managers to look beyond
the short term to identify and plan the changes which will be needed
to address the expected ongoing budget challenge over the next 3
to 5 years.
Support the HSCP through recovery from the COVID-19 pandemic. There
have been additional costs and pressures across the HSCP as a direct
result of the partnership’s response to COVID-19. These costs are
captured and reported to the Scottish Government via Mobilisation Plans.
Support from finance to assist the service in capturing details of all
additional costs associated with the response to COVID-19 to
ensure these are included in Scottish Government funding returns.

Page 39

SOCIAL WORK – OBJECTIVE SUMMARY AS AT 30 JUNE 2022
Service Service
Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Officer
Integration
Integration
Headquarters 53 98 45 45.9% 446 446 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
other bodies and audit fees. This
needs to be adjusted in line with
planned expenditure.  
Chief Officer
Integration
Social Work
Central
Support
(208) 682 890 130.5% 1,536 1,536 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
other bodies. This needs to be
adjusted in line with planned
expenditure.      
(155) 780 935 2 1,982 1,982 0 0  
Head of
Strategic
Planning &
Performance
Management
& Central
Costs
206 88 (118) (134.1%) 421 421 0 0.0%
The YTD variance is as a result of
an invoice being miscoded. This will
be adjusted in July. 
Head of
Strategic
Planning &
Performance
Service
Development 12 5 (7) (140.0%) 32 32 0 0.0%
The YTD variance is as a result of
budget profiling for income receipt.
This needs to be adjusted in line
with anticipated receipt.      
218 93 (125) (3) 453 453 0 0  
Head of Adult
Care - Older
Adults &
Community
Hospitals
Management
& Central
Costs
133 103 (30) (29.1%) 257 257 0 0.0%
The YTD variance is as a result of
budget profiling for income receipt.
This needs to be adjusted in line
with anticipated receipt.

Page 40

Head of Adult
Care - Older
Adults &
Community
Hospitals
Older People 6,904 8,708 1,804 20.7% 37,163 37,163 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
third parties, which includes
additional funding received from
Scottish Government this financial
year. This needs to be profiled in
line with planned expenditure. 
7,037 8,811 1,774 20.1% 37,420 37,420 0 0.0%  
Head of Adult
Care - LD, Mh &
Life Long
Conditions
Learning
Disabilities 3,275 3,072 (203) (6.6%) 12,302 12,302 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
third parties and income. This
needs to be adjusted in line with
planned expenditure and
anticipated income receipt. 
Head of Adult
Care - LD, Mh &
Life Long
Conditions
Management
& Central
Costs
23 29 6 20.7% 128 128 0 0.0%
The YTD variance is as a result of
underspends on staffing costs (not
yet taken towards vacancy savings
target) combined with small
underspends across supplies and
services as a result of budget
profiling. This needs adjusted in line
with planned expenditure.
Head of Adult
Care - LD, Mh &
Life Long
Conditions
Mental
Health 573 562 (11) (2.0%) 2,499 2,499 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
third parties and income. This
needs to be adjusted in line with
planned expenditure and
anticipated income receipt. 
Head of Adult
Care - LD, Mh &
Life Long
Conditions
Physical
Disability 854 676 (178) (26.3%) 2,740 2,740 0 0.0%
The YTD variance is as a result of
budget profiling for income receipt.
This needs to be adjusted in line
with anticipated receipt.      
4,725 4,339 (386) (0) 17,669 17,669 0 0

Page 41

Head of
Children &
Families
Child
Protection 561 728 167 22.9% 3,401 3,401 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
other bodies. This needs to be
adjusted in line with planned
expenditure. This is combined with
underspends as a result of staffing
vacancies which have not yet been
transferred to vacancy savings. 
Head of
Children &
Families
Children with
a Disability 142 221 79 35.8% 911 911 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
other bodies. This needs to be
adjusted in line with planned
expenditure.  
Head of
Children &
Families
Criminal
Justice 48 (28) (76) 271.4% 85 85 0 0.0%
The YTD variance is as a result of
budget profiling for income receipt.
Scottish Government grant income
has been received slower than
anticipated.  
Head of
Children &
Families
Looked After
Children 1,490 1,802 312 17.3% 7,713 7,713 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
other bodies. This needs to be
adjusted in line with planned
expenditure.  
Head of
Children &
Families
Management
& Central
Costs
563 701 138 19.7% 3,277 3,277 0 0.0%
The YTD variance is as a result of
budget profiling for payments to
third parties and rental costs. This
needs to be adjusted in line with
planned expenditure. This is
combined with underspends as a
result of staffing vacancies which
have not yet been transferred to
vacancy savings.      
2,804 3,424 620 18.1% 15,387 15,387 0 0.0%  
GRAND
TOTAL   14,629 17,447 2,818 16.2% 72,911 72,911 0 0.0%

Page 42

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 43

SOCIAL WORK – SUBJECTIVE SUMMARY AS AT 30 JUNE 2022 
Subjective Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 6,258 6,553 295 4.5% 30,295 30,295 0 0.0%
The YTD underspend is mainly due to LD Resource/Day Centres (as posts
have been kept vacant to declare linked budget saving) combined with
Children & Families Area Teams and Adult Services Assessment & Care
Management Teams. These underspends will be used to declare budget
savings or be taken towards the vacancy savings target in the forthcoming
months. This is partially offset by YTD overspends in Homecare due to the
use of agency staff. 
Premises 208 286 78 27.3% 1,149 1,149 0 0.0%
The YTD underspend is due to profiling. This needs to be adjusted in line
with planned expenditure.
Supplies & Services 457 440 (17) (3.9%) 803 803 0 0.0%
The YTD underspend is due to profiling. This needs to be adjusted in line
with planned expenditure.
Transport 122 159 37 23.3% 628 628 0 0.0%
The YTD underspend is due to profiling combined with on-going reduction
in travel costs as a consequence of Covid-19.
Third Party 9,934 15,387 5,453 35.4% 61,548 61,548 0 0.0%
The YTD underspend is due to profiling. This needs to be adjusted in line
with planned expenditure.
Income (2,350) (5,378) (3,028) 56.3% (21,512) (21,512) 0 0.0%
The YTD underspend is due to profiling. This needs to be adjusted in line
with anticipated income receipt.
Totals 14,629 17,447 2,818 16.2% 72,911 72,911 0 0.0% 
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 44

SOCIAL WORK – RED VARIANCES AS AT 30 JUNE 2022
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
A red variance is a forecast variance which is greater than +/- £50,000.

Page 45

MONITORING OF SAVINGS – AS AT 30 JUNE 2022
New policy savings were identified for the three year period 2022-23 to 2024-25 and these were agreed by Council in February 2022. 
Council agreed to policy savings of £0.280m in 2022-23 rising to £0.286m by 2024-25. 
The position of historical policy saving options is as follows:
- 2021/22 – those not delivered or that have further increase in value in 2022-23 onwards total £0.732m
- 2020/21 – those not delivered total £0.050m
- 2019/20 – all delivered
- 2018/19 - those not delivered total £0.498m
The 2022-23 savings have been removed from departmental budgets, however, it is important to monitor whether the saving has
actually been delivered to ensure that costs are not continuing resulting in an overspend by the end of the year.  It is also important
to ensure that any preparatory work required to deliver savings in future years is on track. 
There are four savings categorised as having a potential shortfall and one currently delayed as summarised below:
Saving Saving
Agreed
Status Detail Shortfall/
Delayed
Value
TB07 – Depots  Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
Create one main depot in key areas to reduce costs – it has become
apparent that the operating costs of the single redeveloped site in
each town will increase, reducing the anticipated saving. COVID-19
has also had a detrimental effect on this savings option as
construction works were halted at the site in Oban.  The Oban site
has now all but completed and a saving will be realised against the
operating budget of the vacated depot site, which will partially cover
some of the required saving.
£107,500
TB13b Roads and
Amenity Services
charging (non-
statutory services)
Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
The original proposal was to introduce charges for providing lighting
design and increase charges by 20% for road construction consents,
skips, scaffolds, hoarding, permits and licences. Whilst some
additional income has been generated through third party works,
there have been limited opportunities over the last 2 years and
opportunities are expected to be limited over the foreseeable future.
£100,000

Page 46

TB12b Stadiums Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
Due to COVID, discussions have stalled with partners in the Oban
and Lorn area with regard to Mossfield stadium, to create a sports
Hub, attract external funding to improve facilities and therefore attract
additional events to the arena.  Once restrictions are eased, the
users group will reconvene and report to the steering group.
£20,000
DEG05 – Building
Standards
Feb-20 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
Delay in achieving target due to the impact of COVID-19 on the
building industry and the number of warrants being granted.  This is
now exacerbated by the building market which has slowed due to the
increase in cost and availability of some materials.
£50,000
TB09 – Public
Conveniences
Feb-18 Delayed - The full
saving will not be
achieved in line with
the original estimated
timescale.  
Installation of door entry systems have seen delays due to COVID
and a lack of available suppliers operating at the time.  Tender
returns have been received significantly over the available budget
and work is underway to profile different options to take this scheme
forward in whole or in part.  
£24,000 
All policy saving options previously agreed are noted in the table below for information.

Page 47

2022-23 2022-23
£000 FTE
Chief Executive's Unit
FS02 Feb-22 Financial
Services
Reduction of vacant 0.4FTE Local Tax
Assistant role
10.0 0.40 Delivered
Executive Director Douglas Hendry
PROP01 Feb-21 Commercial
Services
Rationalisation of the Council's property
estate over a three year programme to
identify properties which can either be
disposed of or used to generate
commercial income
294.20 4.0 Still to be Implemented
TB17 Feb-18 Commercial
Services
Identify opportunities for office
rationalisation and raising income
121.50 0.0 On Track to be Delivered
CS01 Feb-22 Commercial
Services
Climate Change & Resource Efficiency 63.0 0.00 On Track to be Delivered
CS03 Feb-22 Commercial
Services
Stretch Targets for One Council Income &
Events
20.0 0.00 On Track to be Delivered
ED5 Feb-21 Education Review and reduce Clerical Support
Entitlement using updated school rolls.
121.00 5.7 Delivered
ED01 Feb-22 Education Removal of Community Learning
Development Manager Post
66.5 1.00 Delivered
Executive Director Kirsty Flanagan
CSS03 Feb-22 Customer
Support
Services
Restructure of CSP/Registration Team at
Helensburgh Civic Centre
19.0 0.50 On Track to be Delivered
DEG01 Feb-22 Development
and Economic
Growth
Crown Estate Administration Contribution
to Project Delivery
101.0 0.00 On Track to be Delivered
DEG05(a) Feb-20 Development
and Economic
Growth
Raise additional fees by adopting the
current Building Cost Information Service
(BCIS) guide for the cost of building work.
Regular service users have been
informed of this change.
50.00 0.0 Potential Shortfall
DEG02 Feb-21 Development
and Economic
Growth
Reduction to overtime budget in the
provision of fire cover at the airports for
weather delayed flights.  Arrangements
are in place that staff no longer remain at
the airport and there is a cut-off period.
22.00 0.0 On Track to be Delivered
DEG07 Feb-21 Development
and Economic
Growth
Additional income through fees and
charges for s64 Non-Material Amendment
Submissions, non e-planning application
submissions and property history
searches
20.00 0.0 Delivered
DEG10 Feb-21 Development
and Economic
Growth
Maximise income through additional
private water supplies income from risk
assessments of supplies  and introducing
a new charge for the provision of shellfish
movement documents
17.50 0.0 Delivered
TB07 Feb-18 Roads and
Infrastructure
Services
Create one main depot in key areas to
reduce costs
172.50 0.0 Potential Shortfall
TB13b Feb-18 Roads and
Infrastructure
Services
Roads & Amenity Services charging (non-
statutory services)
150.00 0.00 Potential Shortfall
R&I17 Feb-21 Roads and
Infrastructure
Services
Public transport fare scale increase 76.00 0.0 On Track to be Delivered
R&I03 Feb-21 Roads and
Infrastructure
Services
Administrative support - rationalise across
service
50.00 2.0 On Track to be Delivered
R&I05 Feb-21 Roads and
Infrastructure
Services
Design service fees - bringing in line with
industry standards and reduce cost of
consultancy. Two posts created as a
50.00 -2.0 On Track to be Delivered
R&I09 Feb-21 Roads and
Infrastructure
Services
Road inspections find and fix -  reduce
reactive work by proactivity. Moving to AI
technology as technology develops
40.00 1.0 On Track to be Delivered
TB12b Feb-18 Roads and
Infrastructure
Services
Review charges for stadiums to enable
improvement work
30.00 0.0 Potential Shortfall
R&I04 Feb-21 Roads and
Infrastructure
Services
Fees and charges - commercial waste,
TTROs, permits/licenses. Access to debt
recovery systems will assist. One post
25.00 -1.0 On Track to be Delivered
TB09 Feb-18 Roads and
Infrastructure
Services
Public Conveniences - Progress
sustainable models including turnstiles
and franchising; establish simpler asset
transfer process
24.00 0.0 Delayed
R&I16 Feb-21 Roads and
Infrastructure
Services
Introduce new fees for electric vehicle
charging
16.00 0.0 On Track to be Delivered
R&I15 Feb-21 Roads and
Infrastructure
Services
Emergency services support and fuel
provision from our fuel supplies
0.50 0.0 Still to be Implemented
TOTAL 1,559.7 11.6
Status of
Implementation
Template
Ref
Saving
Agreed
Service Savings Option

Page 48

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE 
11 AUGUST 2022
FINANCIAL RISKS ANALYSIS 2022-23  
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to provide a summary of the key financial risks
facing the Council.   
1.2  A number of Council wide risks, both revenue and capital have been identified
along with risks for each department and service of the Council.  For each
departmental risk the financial impact has been quantified and the likelihood
assessed based on the standard risk matrix. 
1.3 There are 6 Council wide revenue risks identified for 2022-23 currently amounting
to £3.537m. 
1.4 There are currently 42 departmental risks totalling £5.795m.  Of the 42
departmental risks, one is categorised as almost certain and 5 are categorised as
likely.   
1.5 The financial risks are monitored routinely and actions put in place to continue to
mitigate the risks.

Page 49

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE 
11 AUGUST 2022
FINANCIAL RISKS ANALYSIS 2022-23  
2. INTRODUCTION 
2.1 This report outlines the process and approach developed in carrying out a
financial risks analysis and provides a note of the current assessment of financial
risks for 2022-23. 
3 DETAIL 
3.1 Introduction 
3.1.1 The Council is currently in a period of significant financial challenge.  In
developing its budget to address both restricted resources and cost and demand
pressures there are a number of financial risks the Council needs to consider and
manage. 
3.1.2 There are a number of risks that affect the income or expenditure across the
whole council and these have been identified.  Financial risks have been
considered by each department and service of the Council.   
3.1.3 For each risk, the financial impact has been quantified and the likelihood
assessed based on the standard risk matrix as follows: 
1 – Remote
2 – Unlikely
3 – Possible
4 – Likely
5 – Almost Certain 
3.1.4 The Argyll and Bute Integrated Joint Board (IJB) with responsibility for Social
Work and a range of Health services was established and came into effect on 1
April 2016.  The IJB is responsible for financial and strategic oversight of these
services.  It is the responsibility of the IJB to consider the individual financial risks
associated with Integration Services and they are therefore not contained within
this report.  A Council wide risk has been included in respect of the IJB being
unable to deliver the social care service within the budget allocated. 
3.2 Council Wide Risks 
Revenue 
3.2.1 The 2022-23 budget has a 2% pay award assumption across all categories of
worker and all grades.  Negotiations on the 2022-23 award are in progress and
due to the high level of inflation, it is becoming increasingly likely that the Trade

Page 50

Unions will be negotiating a deal at more than 2%.  However the affordability for
Local Government has to be considered and based on future estimates, anymore
more than a 2% pay award is deemed to be unaffordable hence why the budget
outlook has been based on 2%.  This is a situation that will be kept under close
review as the pay negotiations advance during the year and the assumption will
be adjusted as required.  For each 1% extra in excess of the 2% built in, there
would be an additional cost of around £1.5m.  The financial risk is recognised at
£1.5m at this stage. 
3.2.2 Utility costs remain a volatile area and it is difficult to accurately predict how the
prices could vary.  The outturn in respect of utilities for 2021-22 was an
underspend of £0.310m which was partly due to fixed price contracts that had
been secured which have now expired. With the volatility of utilities pricing it is
very difficult to predict the impact going forward but a financial risk based on a
20% variation in utility costs amounts to £0.706m. 
3.2.3 The estimated level of council tax income is based on current and forecast Band
D equivalents and non-payment rates.  This reflects our most recent experience in
terms of the council tax base and likely collection rates.  A 1% variation in council
tax income amounts to approximately £0.553m.     
3.2.4 At the budget meeting on 24 February 2022, the Council agreed 6 new policy
savings options that would deliver savings over the period 2022-23 to 2024-25. 
The savings to be delivered in 2022-23 amount to £0.280m.  Whilst the Council
have a good track record in delivering savings, a 10% shortfall on this savings
target would amount to £0.028m.    
3.2.5 In respect of the Health and Social Care Partnership, it is the responsibility of the
Chief Officer and Chief Financial Officer to manage the HSCP financial position. 
If an overspend is forecast, a budget recovery plan will be prepared and
submitted to the IJB, the Council and NHS Highland.  Where recovery plans are
unsuccessful and an overspend occurs at the financial year end, and the HSCP
has insufficient reserves to meet the overspend, then the partners will be required
to make additional payments to the HSCP.  Whilst any additional payments by the
Council and NHS Highland will be deducted from future years funding, there is still
a financial risk that the Council may have to pay out additional monies in year.  As
at 30 June 2022, the net HSCP outturn in 2022-23 is estimated to be a £0.346m
overspend (£0m from Social Work and £0.346m from Health). 
3.2.6 There is an ongoing requirement to fund unavoidable inflationary cost increases in
areas like fuel, food etc. This has been predominantly caused by the lack of
availability of supply of labour and materials as a result of the COVID-19
pandemic, the UK exit from the European Union, Russia’s invasion of Ukraine and
sanctions on Russian owned entities.  The Bank of England are currently
forecasting that inflation will continue to rise until around Quarter 1 of 2023 where
after they forecast that it will start to fall.  We will continue to closely monitor the
situation and update our financial forecasts using the best information available to
us.

Page 51

3.2.7  The Council wide risks are noted within the table below.   
Description Likelihood Assessed
Financial Impact
£000
Pay award exceeding 2% 3 1,500
Energy costs increase by 20% greater
than anticipated
3 706
1% variation in Council Tax Income 2 553
10% shortfall on Savings Options 2 28
IJB refer to Council for additional
funding to deliver social work services
3 0
1% variation of General Inflation Risk  4 750
Total  3,537 
Capital 
3.2.8 The finance settlement announcement on 20 December 2021 provided details of
the Local Government funding for 2022-23 and there is therefore certainty as to
what our funding is in respect of General Capital Grant and the specific capital
grants already distributed. 
3.2.9  The capital plan for 2022-23 includes an estimate of £1.387m in respect of capital
receipts.   This is based on an assessment provided by the Special Projects Team
in January 2022.  A 10% variation equates to £0.139m and this would require to
be managed across the capital programme.   
3.2.10 
3.2.11 
3.2.12
General feedback from Scotland Excel and the Project Managers indicates that
price increases and uncertainty are being experienced as well as disruptions to
the supply chain and longer lead times, particularly in relation to the construction
sector and material availability. This can be attributed to a number of factors such
as the COVID-19 pandemic, UK exit from the European Union, invasion of
Ukraine and sanctions on Russian owned entities to name a few. 
The increased rate of inflation impacts costs such as energy prices, labour,
packaging and transport. These all have an effect on the overall contract price
and make it extremely challenging to manage expenditure and the availability of
supply. 
While it has been possible to estimate the impact of these pressures on some
projects, and therefore include those projections within the capital monitoring
report, for others it has been more difficult and an overspend has not been
forecast at this stage but there are likely to be further significant financial impacts
not yet reported within the following projects: 
- Rothesay Pavilion
- Harbour Investment Programme
- Helensburgh Waterfront Development
- Universal Free School Meals

Page 52

3.2.13 For those liabilities/risks to the capital programme that were known at the start of
2022-23 it was agreed at the budget meeting in February 2022 to use amounts
from the Unallocated General Fund, the 2021-22 Revenue Surplus, COVID-19
specific funding and additional borrowing to mitigate these risks.   
3.3 Departmental/Service Risks 
3.3.1 The detail of each departmental financial risk is included within Appendix 1.  The
following table provides a summary of the number of risks within each department
and likelihood category with the financial impact. 
Department 1 - Remote 2 - Unlikely 3 - Possible 4 - Likely 5 - Almost
Certain Total
No £000 No £000 No £000 No £000 No £000 No £000
Chief Executive's
Unit 1 125 0 0 2 115 0 0 1 500 4 740
Executive Director
Douglas Hendry 2 20 10 765 8 780 2 250 0 0 22 1,815
Executive Director
Kirsty Flanagan 2 110 3 240 8 1,735 3 1,155 0 0 16 3,240
Total 5 255 13 1,005 18 2,630 5 1,405 1 500 42 5,795 
3.3.2 The current top three risks in terms of the financial impact are noted in the table
below. 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance -
Bridges, Culverts
& Sea Defences
Extreme localised weather may result in
loss of bridge, culvert, road or sea defence
3 750
Roads and
Infrastructure
Services
Residual Waste
H&L and Tiree
There is a potential increase to tipping
fees and haulage costs for H&L residual
waste.  The Council’s supplier Barr
Environmental (contract to end of 2023)
lost a tribunal relating to the
underpayment of landfill tax, which may
have led to the Council having to source
alternatives at a higher cost.    Barr
appealed the decision which was heard in
the Spring and they won the case which
should have reduced or eliminated this
financial risk.  However, the Scottish
Government laid an Amendment Order on
Friday 1 July 2022 which came into force
at 1700 on 1 July which indicates that
Landfill tax will be due on materials
previously not chargeable and we have
now received notification of an increase in
4 655

Page 53

the cost which officers are currently
assessing
Financial
Services
Council Tax Debt
Collection
Recovery
Recovery of debt becomes more difficult
to pursue in the current economic climate.  
5 500 
3.3.3 The other risks classified as likely are: 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads Materials -
Bitumen
Increased cost of asphalt material due to
price of crude oil rising.  Discussions
emerging from the industry about possible
rationing of bitumen which, if applied, will
affect our programmes due to availability
4 400
Commercial
Services
Catering Costs –
Changes to Food
and Drink in
Schools
Standards
The Scottish Government reviewed the
regulations that govern the food and
drinks currently provided in schools. The
proposed changes were published in June
2019 and were implemented from Easter
2021.  The revised standards focus on
reducing sugar, reducing red and red
processed meat and increasing fibre. Thus
far, there has been an increase in costs
and a reduction in demand for school
meals. 
4 150
Commercial
Services
Catering
Purchases
Increased supplier charges.  This estimate
does not include the additional risk to food
costs and uptake from the changes to food
and drink standards in schools.
4 100
Roads and
Infrastructure
Services
Street Lighting Age of lighting stock requires greater
maintenance as health and safety
becomes a consideration.
4 100 
3.4 Changes to Financial Risks since Budget Pack 
3.4.1 There have been four changes to the departmental risks since the financial risks
report as presented to the Policy and Resources Committee on 24 February
2022, as follows: 
- The risk in relation to Council Tax Debt Collection recovery has been
upgraded from Possible to Almost Certain and the value amended from
£0.100m to £0.500m due to poor collection rates at Week 11 2022-23
compared to the same stage last year.

Page 54

- A new risk has been recognised for Road Materials- Bitumen due to the
price of crude oil rising.  A Likely risk of £0.400m has been recognised.
- The risk in relation to Winter Maintenance has increased in value from
£0.200m to £0.365m in recognition that the price of salt has increased.  
- The risk in relation to Environmental Health export certificates has
increased from Remote to Unlikely and the value amended from £0.030m
to £0.130m to reflect the actual value of outstanding debt and likelihood
that this might not be recovered. 
3.5 Monitoring of Financial Risks 
3.5.1 Financial risks will be reviewed and monitored on a two monthly basis and will be
included in the pack of financial reports submitted to Policy and Resources
Committee.   
4 CONCLUSION 
4.1 This report summarises the key financial risks facing the Council.  There are a
number of Council wide risks and 42 departmental risks identified; one is
categorised as almost certain and 5 are categorised as likely.  The financial risks
are monitored routinely and actions put in place to continue to mitigate the risks.   
5 IMPLICATIONS 
5.1 Policy - None.
5.2 Financial -  The financial value of each risk is included within the
appendix.   
5.3 Legal -  None.
5.4 HR -  None.
5.5 Fairer Scotland Duty - None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty -  None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  Financial risks are detailed within the appendix.
5.8 Customer Service -  None. 
Kirsty Flanagan
Section 95 Officer
8 July 2022 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
APPENDICES
Appendix 1 – Detail of Department/Service financial risks 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 55

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Chief Executive's Unit Financial Services Council Tax Debt Collection
Recovery
Recovery of debt becomes more difficult to
pursue in the current economic climate. 
Robust monitoring of arrangements with
debt collection agency and performance
against target collection rates.
3 100 5 500
Chief Executive's Unit Financial Services Housing Benefit Subsidy Loss of Housing Benefit Subsidy due to exceeding
LA error threshold.
Processes in place for handling of claims
accurately and efficiently.
1 125 1 125
Chief Executive's Unit Financial Services Sundry Debt Recovery Recovery of debt becomes more difficult to
pursue in the current economic climate. 
Robust monitoring of arrangements with
debt collection agency. Joint working with
Legal Services to assist services with the
recovery of aged debt.
3 85 3 85
Chief Executive's Unit Financial Services Non-Domestic Rates Relief Risk of demand changing due to legislative
changes outwith our control or new charitable
businesses. 
Outwith direct management control. 3 30 3 30
Executive Director
Douglas Hendry
Commercial Services Property - Central Repairs Increased demands on central repairs as a result
of the decrease in capital funding available and
increases in supplier/contractor charges.
Joint strategy with procurement colleagues
to reduce potential impact of
supplier/contractor charges.  Close
monitoring of central repairs budgets and
commitments and instructing only essential
repairs.
3 300 3 300
Executive Director
Douglas Hendry
Commercial Services Catering Costs – Changes to
Food and Drink in Schools
Standards
The Scottish Government reviewed the
regulations that govern the food and drinks
currently provided in schools. The proposed
changes  were published in June 2019 and were
implemented from Easter 2021.  The revised
standards focus on reducing sugar, reducing red
and red processed meat and increasing fibre.
Thus far, there has been an increase in costs and
a reduction in demand for school meals.
There is a need to work with Education
colleagues to ensure the maximum uptake
of school meals in secondary schools is
achieved.  This is very challenging given the
reduction in secondary school meal uptake
due to COVID.
4 150 4 150
Executive Director
Douglas Hendry
Commercial Services Catering Costs - Provision of
Meals to Early Years Children
The Children and Young People (Scotland) Act
places duties on Councils to provide meals in an
Early Years setting to entitled children where
sessions span over lunch time.  The total
quantum of funding of £1.2m may not be
sufficient to fund the additional costs depending
on uptake and the additional costs to support the
meal provision in partner provider settings.
Joint strategy with Education colleagues to
implement requirements and closely
monitor financial implications.  Costs likely
to be contained within overall early years
funding allocation.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Catering Purchases Increased supplier charges.  This estimate does
not include the additional risk to food cost and
uptake from the changes to food and drink
standards in schools.
Joint strategy with procurement colleagues
to reduce potential impact.  Control food
wastage/portion controls.
4 100 4 100
Executive Director
Douglas Hendry
Commercial Services Catering - Implementation of
Universal Free School Meals in
Primary Schools
The Scottish Government may not give the local
authority adequate funds to support the policy
Catering Manager sits on National
Operational Delivery Group
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Surplus Properties Ongoing market difficulties lead to increased
numbers of surplus properties, there are residual
running costs associated with surplus properties.
One Council property team now in place. 3 50 3 50
As at February 2022
(Budget Setting) As at 30 June 2022

Page 56

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at February 2022
(Budget Setting) As at 30 June 2022
Executive Director
Douglas Hendry
Commercial Services Leisure Service Level
Agreements
Increase in RPI resulting in requests for additional
funding.
Monitoring annual alteration to contract
RPI rate and mitigation through financial
forecasting and review of existing budget.
2 25 2 25
Executive Director
Douglas Hendry
Commercial Services Rental Income from Properties Due to current economic climate there may be
reduced ability to recover rental income from
leased properties or place suitable tenants in
properties as leases come to an end.
Management of leasehold properties by
Estates team, any issues with debt recovery
being dealt with in line with Council debt
recovery policy.
2 20 2 20
Executive Director
Douglas Hendry
Education Central Repairs Increased demands on budget as a result of
increase in statutory and emergency repairs and
increases in supplier/contractor charges.
Regular liaison with Property Services re
prioritisation and commitment of in-year
spend.
2 100 2 100
Executive Director
Douglas Hendry
Education ASN Support Demand for ASN support continues to increase,
resulting in an additional resource requirement.
The effect of COVID-19 has further increased
demand on this service.
Scottish Government has given additional
funding for "additional support needs
priority for learning" and this has been built
into the budget, this will help reduce the
demand risk 
3 100 3 100
Executive Director
Douglas Hendry
Education Pre-Five Units - retention of
partner providers
Failure in the commissioning or retention of pre-
five partner provider units to deliver 1140 hours
would result in an increased pressure on the
Council to deliver the service.
Annual financial appraisal; Support
network; Short-term cash injections.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Children and Young People
(Scotland) Act - ELC 1140 hours
The Council has been required to deliver 1140
hours of Early Learning and Childcare since
August 2021.  The Scottish Government has
committed to funding this and the Council has
altered the implementation plan to align it to the
Scottish Government funding profile.  A risk
remains that actual costs of delivery exceed the
Government Grant in any given year.  For
example, if child numbers are higher than
estimated, this may require additional staffing
which has not been built into the staffing model
funded by Scottish Government.
Continuous monitoring and review of the
implementation plan, usage and resources.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Education (Scotland) Act
Education (Scotland) Act 2000 was enacted
March 2016.  This places additional requirements
on Councils to carry out assessments of the need
for the provision of Gaelic Medium Primary
Education (GMPE) and the duty to support and
promote Gaelic Education. May lead to additional
staffing requirements.
Monitoring developments of the
implementation of the Act and statutory
guidance produced and adhered too.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Hub DBDA/DBFM Schools  -
Litigation
Increased risk of the requirement to litigate to
conclude final capital contract payments due.
Monitoring claims and mitigation through
robust challenge of any additional claims.
2 150 2 150
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Contract RPI for NPDO and Hub
Schools
Increase in RPI would result in higher costs. Monitoring annual alteration to contract
RPI rate and mitigation through financial
forecasting and review of existing budget.
2 100 2 100

Page 57

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at February 2022
(Budget Setting) As at 30 June 2022
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO - Reduction in insurance
savings within NPDO Schools
Increase in insurance costs as a result of Covid-19
and flood claims.
Monitoring annual alteration to contract
insurance rate and mitigation through
financial forecasting and review of existing
budget.
2 75 2 75
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services - Litigation Increased number of litigation cases. Ensure Legal Services are gateway to access
all legal advice and that advice is sought at
earliest opportunity.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO/Hub DBFM contract
management efficiencies
Reduction in ability to generate contract
management efficiencies.
Monitoring annual efficiencies generated
and mitigation through robust contract
management and application of contract
specifications/requirements.
2 50 2 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Elections More than 1 by-election required outwith
standard election cycle.
Outwith direct management control. 2 45 2 45
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Licensing Reduced numbers of licensing applications
leading to reduced income.
Monitoring of trends and reporting the
financial impact in the budget monitoring.
3 30 3 30
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Children's Panel Increased number of referrals increasing costs
through increases in the running costs.
Maximise the use of council
facilities/resources for panel session in the
first instance.
1 10 1 10
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services Failure to minimise Council wide use of external
legal advice.
Ensure legal services are gateway to access
all legal advice.
1 10 1 10
Executive Director
Kirsty Flanagan
Customer Support Services Software Licences Potential risk of being underlicensed for software
which will be identified via software audits which
would incur additional costs.
ICT security and compliance officer in post
and duties include review of systems to
ensure fully licenced. 
2 100 2 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Environmental Health- export
certificates
Downturn in requests for export certificates as a
result of UK withdrawal from EU, changes to
international trading agreements or business
economy. Reduction in demand creates a budget
pressure on environmental health budget.
Monitor income and resources required for
export health certificates/attestations
required to support the export market.
Continue with food safety regulation
activities associated and support at 3rd
country audits.  Pursue debt rigorously with
key customers through seeking regular
payments.
1 30 2 130
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Dangerous Buildings
interventions
Building Standards having to deal with an
increasing level of dangerous building work which
has significant financial implications for Council.
Monitor activity and seek to recover costs
from the owner.
3 100 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fees reduced by
Scottish Government
Scottish Government reducing planning fees due
to poor performance by the Planning Authority. 
Details of national Planning Performance Co-
ordinator and Fee Reform still awaited.
Maintain high levels of performance as
articulated by performance markers
detailed in Planning Performance
Framework annual report.
1 100 1 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fee shortfalls Due to downturn in economic / building activity,
in particular renewable energy development and
other major developments could lead to planning
fee income shortfalls leading to revenue budget
pressures.
Continue to monitor Development
Management income and expenditure
tightly and investigate further income
generation streams.  Lobby Scottish
Ministers through professional
organisations to increase planning fees to a
sustainable level.
3 100 3 100

Page 58

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at February 2022
(Budget Setting) As at 30 June 2022
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Building Warrant fee shortfalls Due to loss of commercial income and downturn
in economic / building activity, building warrant
fee income shortfalls leading to revenue budget
pressures.
Continue to monitor Building Standards
income and expenditure tightly and
investigate further income generation
streams. 
3 100 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Homelessness Temporary
Accommodation Income
Unpredictable number of Homeless applications.
Inability to recover rent.  Increase costs of
property maintenance and tenancy change over.
Provision of Housing Options information
and advice service to minimise number of
applicants proceeding to full homeless
application.  Implementation of Rapid
Rehousing Plan.
3 50 3 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Animal Health Carrying out livestock seizure to protect welfare
of the animals
Monitor activity and seek to recover costs
from the disposal of the animals.
1 10 1 10
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Airfields and Air Services -
usage
The PSO for the existing air service to Coll and
Colonsay operating from Connel Airport is due in
2022.  It is likely that this will create a budget
pressure for a new contract to be established to
serve the needs of the island communities.
Need to start early in raising awareness of
the contract possibility with external
contractors.  This renewal of the contract
has to also be raised with the Scottish
Government as there may need to
additional Government support to retain
this life line service.
2 10 2 10
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Roads Maintenance - Bridges,
Culverts & Sea Defences
Extreme localised weather may result in loss of
bridge, culvert, road or sea defence.
The recent storm damage to Bute Sea Wall is
likely to cost in excess of £1m to repair so the
value on this risk has been updated for 22-23 in
recognition of the potential costs associated with
this risk
Routine inspections to deal with potential
weak areas - based on a stitch in time repair
regime.
3 750 3 750
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Residual Waste H&L and Tiree There is a potential increase to tipping fees and
haulage costs for H&L residual waste.  The
Council’s supplier Barr Environmental (contract to
end of 2023) lost a tribunal relating to the
underpayment of landfill tax, which may have led
to the Council having to source alternatives at a
higher cost.    Barr appealed the decision which
was heard in the Spring and they won the case
which should have reduced or eliminated this
financial risk.  However, the Scottish Government
laid an Amendment Order on Friday 1 July 2022
which came into force at 1700 on 1 July which
indicates that Landfill tax will be due on materials
previously not chargeable and we have now
received notification of an increase in the cost
which officers are currently assessing
Officers currently assessing the potential
impact on the Council.
4 655 4 655

Page 59

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at February 2022
(Budget Setting) As at 30 June 2022
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Roads Materials - Bitumen Increased cost of asphalt material due to price of
crude oil rising.  Discussions emerging from the
industry about possible rationing of bitumen
which, if applied, will affect our programmes due
to availability
Increased costs are currently being
managed but with further increases likley,
this is being closely monitored by managers
to evaluate the impact.
4 400
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Winter Maintenance Adverse weather conditions which require
greater than budgeted number of gritting runs.
Monitor weather conditions and apply
gritting policy to minimise costs.
3 200 3 365
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Roads Maintenance - Roads
Network
Adverse weather conditions result in
deterioration of the road network necessitating
greater spend on repair of defects.
Manage maintenance budgets to ensure
that spend is prioritised to deal with safety
defects.
3 230 3 230
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Street Lighting Age of lighting stock requires greater
maintenance as health and safety becomes a
consideration.
Manage maintenance budgets to ensure
that spend is prioritised to deal with safety
defects.
3 100 4 100
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Ferry Services - income Changes to ferry services resulting in reduced
passenger income.
Ensure that ferry operators are charged for
the correct number of passengers
3 40 3 40
41 4,730 42 5,795

Page 60

ARGYLL  AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE  
FINANCIAL SERVICES 11 AUGUST 2022 
CAPITAL BUDGET MONITORING REPORT – 30 JUNE 2022 
1.0 EXECUTIVE SUMMARY 
1.1 This provides an update on the position of the capital budget as at 30 June
2022. The report provides information on the financial position in respect of the
capital plan and also the performance in terms of delivery of capital plan
projects. 
1.2  Financial Position: 
 Current Year to Date – actual net expenditure to date is £3,777k
compared to a budget for the year to date of £3,765k giving rise to an
overspend for the year to date of £12k (0.3%).
 Forecast Outturn for 2022-23 – forecast net expenditure for the full
financial year is £29,319k compared to an annual budget of £48,555k
giving rise to a forecast underspend for the year of £19,236k (39.6%).    
 Total Capital Plan – forecast total net project costs on the total capital
plan are £177,521k compared to a total budget for all projects of
£177,387k giving rise to a forecast overspend for the overall capital plan
of £134k (0.08%). 
1.3 Project Delivery: 
 Asset Sustainability – Out of 91 projects there are 85 projects (93%) on
track, 6 projects (7%) off track but recoverable and 0 projects off track
(0%).
 Service Development - Out of 41 projects there are 36 projects (88%) on
track, 5 projects (12%) off track but recoverable and 0 projects (0%) off
track.
 Strategic Change – Out of 27 projects there are 24 projects (89%) on
track, 3 projects (11%) off track but recoverable and 0 projects (0%) off
track.   
1.4 
1.5
The Capital Programme is funded by various income streams as detailed in
Appendix 5. Additional funding allocated since the last report has come from
SPT, Crown Estate, Scottish Government, income from Lismore Ferry sale and
HITRANS. 
The Council is projecting £1,387k of capital receipts this financial year. At this
early stage in the year no receipts have been received but this will be closely
monitored throughout the year and any issues highlighted.

Page 61

ARGYLL  AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE  
FINANCIAL SERVICES 11 AUGUST 2022 
CAPITAL BUDGET MONITORING REPORT – 30 JUNE 2022 
2.0  INTRODUCTION 
2.1 
2.2 
2.3 
2.4 
2.5 
This report provides an update on the position of the capital budget as at 30 June
2022. The report provides information on the financial position in respect of the
capital plan and also the performance in terms of delivery of capital plan projects. 
Following the decision at Policy and Resources Committee on 9 December 2021,
the Rothesay Pavilion project is on pause whilst potential funding options are being
considered. The financial information included within this report therefore now
excludes amounts relating to Rothesay Pavilion.   
A £1m cost pressure was identified during 2021-22 in relation to repairs to the
A884 Ardbeg Sea Wall, where severe storm damage resulted in failure of the sea
wall on Bute. Emergency works were carried out and a permanent solution is
currently being developed. Additional funding of £1m was allocated for this
purpose at the Council meeting on 24 February 2022 however there remains a risk
that costs will exceed this. It was agreed at Environment, Development and
Infrastructure Committee on 2 June 2022 that the Chair would approach the
Scottish Government with a view to securing additional resources to support the
scheme. 
Project Managers were asked to identify specific Covid-19 impacts on the capital
programme. At the budget meeting on 25 February 2021, the Council agreed to
provide £2.5m of funding and following agreement at the Policy and Resources
Committee on 14 October 2021, this, plus a further £0.146m, was added to the
capital programme. 
Furthermore, at the budget meeting on 24 February 2022, an additional £3.9m was
set aside for future capital contract increases. This includes up to £1.2m for
Campbeltown Flood Scheme, the final costs of which are estimated to be
£15.215m. The Scottish Government will fund 80% of scheme costs with the
Council expected to contribute an estimated £3.043m. 
The impact of the pandemic along with the UK exit from the European Union,
invasion of Ukraine and sanctions on Russian owned entities has seen significant
price increases as well as disruptions to the supply chain and longer lead in times.
The increased rate of inflation impacts costs such as energy prices, labour,
packaging and transport. These all have an effect on the overall contract price and
make it extremely challenging to manage expenditure and the availability of
supply. 
As a result of this it should be noted that there are likely to be other significant
financial impacts which are not quantifiable at this stage, as follows: 
 Rothesay Pavilion – project currently paused due to increased costs as a
result of the main contractor being placed into administration in March 2020.

Page 62

4.0 CURRENT YEAR TO DATE FINANCIAL POSITION 
4.1 
4.2
Overall Position 
Actual net expenditure to date is £3,777k compared to a budget for the year to
date of £3,765k giving rise to an overspend for the year to date of £12k (0.3%). 
Project/Department Position 
The table below shows the year to date net expenditure against the year to date
budget by project type and service: 
Project Type:
Year to
Date
Budget    
£'000
Year to
Date
Actual    
£'000
Variance       
£'000
Asset Sustainability 969 1,016 (47)
Service Development 619 584 35
Strategic Change 2,177 2,177 0
Total  3,765 3,777 (12)
Service:      
ICT 545 545 0
Education 1,093 1,055 38
Live Argyll 21 68 (47)
Health & Social Care Partnership 0 0 0
Shared Offices 11 11 0
Roads & Infrastructure 139 141 (2)
Development & Economic Growth 258 259 (1)
CHORD 1,698 1,698 0
Total 3,765 3,777 (12) 
Material variances are explained in Appendix 1 and there are a number of small
variances contributing to the year to date overspend. 
 Harbour Investment Programme – likely to be contractual cost increases in
future years (expected to be funded from increased fees and charges).
 Helensburgh Waterfront Development – commercial negotiations are
ongoing with the main contractor to determine financial impact.  
 Universal Free School Meals – delayed roll out to P6 and P7 and uncertain
capital funding levels available from Scottish Government (delay not
mentioned as part of Resource Spending Review). 
 Other general construction inflationary increases.
3.0 RECOMMENDATIONS 
3.1 Note the contents of this report and the financial summaries as detailed in
Appendix 7 and approve the proposed changes to the capital plan detailed in
Appendix 4.

Page 63

5.0  FORECAST OUTTURN 2022-23 
5.1  Overall Position 
Forecast net expenditure for the full financial year is 29,319k compared to an annual
budget of £48,555k giving rise to a forecast overspend for the year of £19,236k
(39.6%).  This is largely due to £19,370k of re-profiling budgets at the start of the
financial year and does not reflect genuine underspends within the programme. 
5.2 Project/Department Position 
The table below shows the forecast expenditure and budget for the year by project
type and service. 
Project Type:
Annual
Budget            
£'000
Forecast
Outturn        
£'000 
Forecast
Variance 
COVID-
19
Related       
£'000
Forecast
Variance 
Non
COVID-
19
Related       
£'000
Forecast
Variance         
£'000
Asset Sustainability 26,627 26,685 0 (58) (58)
Service Development 4,500 4,560 0 (60) (60)
Strategic Change 17,428 (1,926) 0 19,354 19,354
Total  48,555 29,319 0 19,236 19,236
Service:          
ICT 1,518 1,518 0 0 0
Education 6,097 6,109 0 (12) (12)
Live Argyll 1,235 1,304 0 (69) (69)
Health & Social Care
Partnership 2,107 2,109 0 (2) (2)
Shared Offices 4,197 4,213 0 (16) (16)
Roads & Infrastructure 26,712 7,376 0 19,336 19,336
Development &
Economic Growth 2,770 2,771 0 (1) (1)
CHORD 3,919 3,919 0 0 0
Total 48,555 29,319 0 19,236 19,236 
Material variances are explained in Appendix 2 and there are a number of smaller
variances contributing to the forecast overspend.

Page 64

6.0  TOTAL PROJECT COSTS 
6.1 Overall Position 
Forecast total net project costs on the total capital plan are £177,521k compared to
a total budget for all projects of £177,387k giving rise to a forecast overspend for
the overall capital plan of £134k (0.08%). 
6.2  Project/Department Position 
The table below shows the forecast expenditure and budget for the total capital
plan by project type and service. 
Project Type:
Capital
Plan
Budget           
£'000
Forecast
Project
Costs        
£'000 
Capital
Plan
Variance 
COVID-19
Related       
£'000
Capital
Plan
Variance 
Non
COVID-
19
Related       
£'000
Total
Capital
Plan
Variance         
£'000
Asset Sustainability 50,444 50,502 0 (58) (58)
Service Development 18,838 18,898 0 (60) (60)
Strategic Change 108,105 108,121 0 (16) (16)
Total  177,387 177,521 0 (134) (134)
Service:          
ICT 5,007 5,007 0 0 0
Education 41,833 41,845 0 (12) (12)
Live Argyll 3,368 3,437 0 (69) (69)
Health & Social Care
Partnership 4,222 4,224 0 (2) (2)
Shared Offices 21,507 21,523 0 (16) (16)
Roads &
Infrastructure 52,878 52,912 0 (34) (34)
Development &
Economic Growth 4,734 4,735 0 (1) (1)
CHORD 43,838 43,838 0 0 0
Total 177,387 177,521 0 (134) (134) 
Material variances are explained in Appendix 3 and there are a number of
smaller variances leading to the forecast overspend.

Page 65

7.0  TOTAL PROJECT PERFORMANCE 
7.1 Overall Position 
There are 159 projects within the Capital Plan, 145 are Complete or On Target, 14
are Off Target and Recoverable and none are Off Track. 
7.2  Project Position 
The table below shows the Performance Status of the Projects in the Capital Plan. 
Project Type:
Complete
/ On
Target
Off Target/
Recoverable
Off Target/
Problem Total    
COVID
-19
Related
Non-
COVID
-19
Related
COVID
-19
Related
Non-
COVID
-19
Related 
Asset
Sustainability 85 0 6 0 0 91
Service
Development 36 0 5 0 0 41
Strategic
Change 24 0 3 0 0 27
Total 145 0 14 0 0 159
Service:            
ICT 7 0 0 0 0 7
Education 29 0 1 0 0 30
Live Argyll 22 0 6 0 0 28
Health & Social
Care Partnership 16 0 1 0 0 17
Shared Offices 21 0 0 0 0 21
Roads &
Infrastructure 30 0 5 0 0 35
Development &
Economic
Growth 16 0 0 0 0 16
CHORD 4 0 1 0 0 5
Total 145 0 14 0 0 159

Page 66

7.3  Chart of Performance Status 
The graph provides a view of the Performance Status of the Projects included  in
the Capital Plan:

Page 67

8.0 OFF TRACK PROJECTS 
8.1 
9.0 
9.1 
10.0
There are no Off Track projects currently being reported. 
STRATEGIC CHANGE PROJECTS 
Appendix 6 gives detailed information in respect of the Strategic Change
Projects within the Capital Plan. The appendix gives details of the forecast cost
of the project against the approved budget, the start and anticipated completion
date of the project and an assessment of the risks of the project and if these are
not green gives an explanation of the problem. 
CHANGES TO CAPITAL PLAN 
10.1  The table below shows proposed changes to the Capital Plan at summary level
which include slippages, accelerations and virements. Explanations relating to
the specific projects involved can be seen in Appendix 4. 
The updated capital plan incorporating these proposed changes can be found in
Appendix 8. 
Department Prev.
Agreed
Changes 
2022-23
£'000
22-23
£'000 
COVID-
19
Related
22-23
£'000 
Non
COVID-
19
Related
23-24
£'000
24-25
£'000
Future
Years
£'000
Total 
£'000
Asset
Sustainability 0 0 0 0 0 0 0
Service
Development 0 0 0 0 0 0 0
Strategic
Change 0 0 (19,370) 6,140 4,731 15,389 6,890
Total 0 0 (19,370) 6,140 4,731 15,389 6,890                
Service:              
ICT 0 0 0 0 0 0 0
Education 0 0 0 0 0 0 0
Live Argyll 0 0 0 0 0 0 0
Health &
Social Care
Partnership
0 0 0 0 0 0 0
Shared Offices 0 0 0 0 0 0 0
Roads &
Infrastructure 0 0 (19,370) 6,140 4,731 15,389 6,890
Development
& Economic
Growth
0 0 0 0 0 0 0
Major Projects 0 0 0 0 0 0 0
Total 0 0 (19,370) 6,140 4,731 15,389 6,890

Page 68

11.0          FUNDING 
11.1 
11.2 
12.0 
12.1 
12.2 
12.3 
12.4 
12.5 
12.6 
12.7 
12.8
The Capital Programme is funded by various income streams as detailed in
Appendix 5. Additional funding allocated since the last report has come from
SPT, Crown Estate, Scottish Government, income from Lismore Ferry sale and
HITRANS. 
The Council is projecting £1,387k of capital receipts this financial year. At this
early stage in the year no receipts have been received but this will be closely
monitored throughout the year and any issues highlighted. 
IMPLICATIONS 
Policy – Monitors progress against the capital plan. 
Financial – Monitors funding and commitments of the capital plan. 
Legal – Available funding may not address all Statutory and Regulatory
requirements in relation to Health and Safety. 
HR – Available funding may have an impact on the sustainability of the Property
Design Team and Infrastructure Design Team. 
Fairer Scotland Duty – None. 
12.5.1     Equalities – protected characteristics – None. 
12.5.2     Socio-economic Duty – None. 
12.5.3     Islands – None. 
Climate Change – The Council is committed to addressing climate change via
projects within the capital plan. 
Risk – There are risks around increasing capital contract costs and the level and
timing of capital receipts. 
Customer Service – None. 
Kirsty Flanagan 
Executive Director / Section 95 Officer 
8 July 2022                                                  
Policy Lead for Finance and Commercial Services – Councillor Gary
Mulvaney 
For further information contact: Anne Blue, Head of Financial Services 
APPENDICES 
- Appendix 1 – Year To Date finance variance explanations
- Appendix 2 – Forecast Outturn variance explanations
- Appendix 3 – Total Project finance variance explanations
- Appendix 4 – Changes to Capital Plan and Financial Impact
- Appendix 5 – Capital Funding
- Appendix 6 - Cumulative spend, completion dates and risks relating                         
to significant capital projects. 
- Appendix 7 - Financial Summary – Overall
- Financial Summary – Executive Director Kirsty Flanagan
- Financial Summary – Executive Director Douglas Hendry
- Appendix 8 - Updated/Revised Capital Plan

Page 69

APPENDIX 1 – Year to Date Financial Variance Explanations
Listed below are the projects where the variance is +/- £50k.
Project
YTD
Budget
£’000
YTD
Actual
£’000
(Over)/
Under
Variance       
£’000
Explanation    
No variances +/-£50k for this report.
Other variances under £50k   (12) Total value of non-material variances less than +/-£50k
Total   (12)

Page 70

APPENDIX 2 – Outturn Variance Explanations
Listed below are the projects where the current year variance is +/- £50k. 
Project 
Annual
Budget
£’000
Outturn
£’000 
(Over)/
Under
Forecast
Variance
COVID-19
Related         
£’000
(Over)/
Under
Forecast
Variance
Non COVID-
19 Related         
£’000
Total
(Over)/
Under
Forecast
Variance         
£’000
Explanation
Campbeltown Flood Scheme 10,354 9,098  0 1,256 1,256 Slippage in line with contractor cashflow
Harbour Investment Programme 33,664 15,550  0 18,114 18,114 Slippage in line with Asset Management Plan
Other variances under £50k                  0 (134) (134) Total value of non-material variances less than +/-
£50k.
Total  0 19,236 19,236

Page 71

APPENDIX 3 – Total Project Finance Variances
Listed below are the projects where the total project variance is +/- £50k. 
Project 
Capital
Plan
Budget
£’000
Forecast
Project
Costs
£’000 
(Over)/
Under
Forecast
Variance
COVID-19
Related         
£’000
(Over)/
Under
Forecast
Variance
Non COVID-
19 Related        
£’000
Total
(Over)/
Under
Forecast
Variance         
£’000
Explanation       
No variances +/-£50k for this report.
Other variances under £50k             (134) (134) Total value of non-material variances less than +/-
£50k. Project Managers are working to reduce these
small individual overspends by identifying
underspends elsewhere within the capital plan.
Total  (134) (134)

Page 72

APPENDIX 4 – Changes to Capital Plan and Financial Impact
OVERALL COST CHANGES
Project
2022-
23
£’000
2023-
24
£’000
2024-
25
£’000
Future
Years
£’000
Total
Capital Plan
£’000
Recommendation Explanation      
No overall cost changes this reporting period.
Total Cost Changes 0 0 0 0 0   
SLIPPAGES AND ACCELERATIONS
Project 2022-23
£’000
2023-
24
£’000
2024-
25
£’000
Future
Years
£’000 
2022-23
Slippage
Related
to
COVID-
19
£’000
2022-23
Slippage
Related
to Non
COVID-19
£’000
Total
2022-23 
£’000
Recommendation Explanation
Campbeltown Flood
Scheme (1,256) (75) 1,331 0  0 (1,256) (1,256) Slip budget into
future years.
Budget profile in line with
anticipated spend.
Harbour Investment
Programme (18,114) 6,215 3,400 15,389  0 (18,114) (18,114) Slip budget into
future years
Budget profile in line with
anticipated spend based on
Asset Management Plan.
Total Slippages and
Accelerations
(19,370) 6,140 4,731 15,389  0 (19,370) (19,370)  
Net Impact of
Changes
(19,370) 6,140 4,731 15,389  0 (19,370) (19,370)

Page 73

CAPITAL PROGRAMME FUNDING Appendix 5
Estimated
Capital
Funding
Carry
Forwards
from 21-22
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
Estimated
Capital
Funding
Carry
Forwards
from 21-22
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
Estimated
Capital
Funding
Carry
Forwards
from 21-22
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
General Capital Grant 9,569 0 0 0 9,569 9,569 0 0 0 9,569 9,569 0 0 0 9,569
Transfer to Revenue for Private Sector Housing Grant (PSHG) -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033
Capital Receipts 1,387 0 0 0 1,387 1,095 0 0 0 1,095 0 0 0 0 0
Flooding Allocation 155 0 0 0 155 155 0 0 0 155 155 0 0 0 155
Ring Fenced Capital Grant 4,656 2,722 0 268 7,646 0 5,728 0 0 5,728 0 0 0 0 0
Restricted Funding 1,486 609 0 756 2,851 1,150 0 0 0 1,150 0 0 0 0 0
Funded by Reserves 3,145 4,388 -1,256 7 6,284 36 172 -75 0 133 0 0 1,331 0 1,331
Additional Funding from Revenue 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Insurance 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Harbour Investment Programme 31,180 2,484 -18,114 0 15,550 16,900 0 6,125 0 23,025 31,600 0 -3,400 0 28,200
Prudential Borrowing 15,528 3,352 100 0 18,980 5,006 -1,429 -100 0 3,477 27 0 0 0 27
Loans Fund Review 0 4,025 0 0 4,025 0 0 0 0 0 0 0 0 0 0
COVID Funding 1,640 2,167 0 0 3,807 0 0 0 0 0 0 0 0 0 0
67,713 19,747 -19,270 1,031 69,221 32,878 4,471 5,950 0 43,299 40,318 0 -2,069 0 38,249
BREAKDOWN OF ADDITIONAL FUNDING
Additional Funding 2022-23 2023-24 Reported
C'town Museum LA income 40 Live Argyll Jun-22
H&L/Rosneath Cycleways 140 Jun-22
Nature Restoration Fund 238 Jun-22
Rothesay Pontoons 315 Grant Funding Jun-22
Ardrishaig North 280 Grant Funding Jun-22
Lismore Ferry 7 External Income Jun-22
Lochgilphead PS Demolition 11 Reserves Jun-22
Total 1,031 0
2024-252023-24
Source
2022-23
SPT
Scottish Government

Page 74

Strategic Change Projects - Cumulative Spend, Start/Finish Dates and Project Risks APPENDIX 6
Strategic Change Projects
Prior Years
Spend
£'000
Current Year
Forecast
£'000
Total Project
Forecast
£'000
Total Project
Budget
£'000
Project Start
Date
Original
Estimated
Completion
Date
Project
Risks
Identified Explanation
CHORD Oban 7,129 651 7,905 7,905 27/10/2016 31/03/2022 Amber Issues with contract close out impacting on timescales.
Harbour Investment Programme 1,802 15,550 91,292 91,292 01/04/2017 31/03/2028 Amber Project expenditure profile updated to reflect Asset Management Plan.
Campbeltown Flood Scheme 181 9,098 15,215 15,215 01/08/2016 31/03/2023 Amber Work expected to start over summer months.
Dunoon Primary 7,170 304 10,869 10,869 18/12/2014 30/04/2020 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Kirn Primary School 9,878 99 10,119 10,119 24/04/2014 31/10/2017 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Replacement of Oban High 2,496 136 3,250 3,250 24/04/2014 31/01/2019 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Street Lighting LED Replacement 2,700 791 3,900 3,900 01/08/2016 30/03/2022 Green Tender for final package of works still to be awarded - budget to be reprofiled.
Helensburgh Office Rationalisation 11,500 310 11,838 11,838 25/04/2013 31/03/2022 Green Project subject to legal dispute.
CHORD Dunoon 12,238 55 12,522 12,522 03/02/2012 09/03/2018 Green
Main contract complete and retentions paid. Landscaping and remediation works ongoing but
issues with water ingress may require works in 22-23.
Helensburgh Waterfront Development 1,387 2,895 22,557 22,557 01/04/2017 31/03/2024 Green Additional funding awarded resulting in increased budget. Budget to be reprofiled.
Kilmory Business Park Phase 2AA 0 141 150 150 01/02/2022 01/09/2023 Green Development Agreement still to be concluded.
Carbon Management Business Cases 201 60 261 261 01/02/2014 31/03/2022 Green Budget to be reprofiled pending development of new projects.
Carbon Management - Group Heating Conversion Project 1,938 10 1,948 1,948 01/02/2016 31/03/2022 Green Complete.
Carbon Management - Non Education 14 21 50 50 01/04/2015 31/03/2022 Green Projects being determined.
NPDO Schools Solar PV Panel Installations 761 183 944 944 26/06/2014 31/03/2022 Green Budget to be reprofiled pending development of new projects.
Non NPDO Schools Solar PV Panel Installations 400 88 488 488 20/03/2014 31/03/2022 Green Budget to be reprofiled pending development of new projects.
Carbon Management Capital Property Works 2016/17 19 20 39 39 01/02/2016 31/03/2022 Green Budget to be reprofiled pending development of new projects.
Oil to Gas Heating Conversions 182 5 187 187 01/02/2012 31/03/2022 Green Budget to be reprofiled pending development of new projects.
TIF - Halfway House Roundabout 0 597 640 640 tbc tbc Green Scope of project still to be determined - budget to be reprofiled.
Dunoon Pier OBC 2,844 0 2,844 2,844 03/02/2012 26/02/2016 Green Project complete.
Campbeltown Office Rationalisation 595 1 596 596 01/02/2015 31/03/2019 Green Complete.
TIF - Oban Airport Business Park 447 101 590 590 22/01/2015 31/03/2022 Green
Campbeltown Schools Redevelopment 1,649 76 2,130 2,130 16/02/2012 30/11/2018 Green Physically complete - negotiations with contractor delaying payment of financial sums outstanding.
CHORD - Helensburgh 6,483 28 6,557 6,557 29/09/2011 30/04/2015 Green Main contract complete. Art project originally proposed for 21-22 now slipped into 22-23.
TIF - North Pier Extension 214 0 214 214 06/12/2017 06/12/2021 Green Complete.
TIF - Lorn/Kirk Road 1,959 1 2,170 2,170 22/01/2015 31/03/2021 Green Complete.
Carbon Management Fuel Conversions 107 0 107 107 01/02/2014 31/03/2019 Green Complete.
Kilmory Biomass  Carbon Management 956 0 956 956 20/09/2012 31/03/2019 Green Complete.
Strategic Change Total 75,250 31,221 210,338 210,338
Project Risk Classifications:
Green - Risks can be managed and are viewed as stable or reducing.
Amber - Risks are increasing but are still manageable.
Red - Risks are increasing or have increased to such an extent they may affect delivery of the project.
Capital Expenditure Dates Risks

Page 75

ARGYLL AND BUTE COUNCIL - CAPITAL PLAN MONITORING REPORT - OVERALL COUNCIL
FINANCIAL SUMMARY - NET EXPENDITURE
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Executive Director Douglas Hendry 415 462 (47) 10,030 10,088 (58) 19,032 19,090 (58)
Executive Director Kirsty Flanagan 554 554 0 18,029 18,029 0 32,844 32,844 0
Asset Sustainability Total 969 1,016 (47) 28,059 28,117 (58) 51,876 51,934 (58)
Service Development Projects
Executive Director Douglas Hendry 254 254 0 1,242 1,267 (25) 15,144 15,169 (25)
Executive Director Kirsty Flanagan 415 437 (22) 7,304 7,339 (35) 32,600 32,635 (35)
Service Development Total 669 691 (22) 8,546 8,606 (60) 47,744 47,804 (60)
Strategic Change Projects
Campbeltown Schools Redevelopment 38 38 0 76 76 0 2,130 2,130 0
Dunoon Primary 257 257 0 304 304 0 10,869 10,869 0
Replacement of Oban High 96 96 0 136 136 0 3,250 3,250 0
Kirn Primary School 65 65 0 99 99 0 10,119 10,119 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Carbon Management Business Cases 0 0 0 60 60 0 261 261 0
NPDO Schools Solar PV Panel Installations 0 0 0 183 183 0 944 944 0
Non NPDO Schools Solar PV Panel Installations 0 0 0 88 88 0 488 488 0
Carbon Management Fuel Conversions 0 0 0 0 0 0 107 107 0
Carbon Management Capital Property Works 2016/17 0 0 0 20 20 0 39 39 0
Carbon Management - Group Heating Conversion Project 0 0 0 10 10 0 1,948 1,948 0
Kilmory Biomass  Carbon Management 0 0 0 0 0 0 956 956 0
Oil to Gas Heating Conversions 0 0 0 5 5 0 187 187 0
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 0 0 0 310 310 0 11,838 11,838 0
Clean Energy 0 0 0 551 567 (16) 729 745 (16)
Clean Energy 2022-23 0 0 0 500 500 0 500 500 0
Campbeltown Flood Scheme 23 23 0 10,354 9,098 1,256 15,215 15,215 0
Street Lighting LED Replacement 0 0 0 791 791 0 3,900 3,900 0
Harbour Investment Programme 138 138 0 33,664 15,550 18,114 91,292 91,292 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - North Pier Extension 0 0 0 0 0 0 214 214 0
TIF - Oban Airport Business Park 0 0 0 101 101 0 590 590 0
TIF - Halfway House Roundabout 0 0 0 597 597 0 640 640 0
CHORD - Helensburgh 0 0 0 28 28 0 6,557 6,557 0
CHORD Dunoon 2 2 0 55 55 0 12,522 12,522 0
CHORD Oban 0 0 0 651 651 0 7,905 7,905 0
Helensburgh Waterfront Development 1,696 1,696 0 2,895 2,895 0 22,557 22,557 0
HWD - FFE (Funded by LA) 0 0 0 344 344 0 350 350 0
Kilmory Business Park Phase 2AA 0 0 0 141 141 0 150 150 0
Dunoon Pier OBC 0 0 0 0 0 0 2,844 2,844 0
Strategic Change Total 2,315 2,315 0 51,986 32,632 19,354 211,917 211,933 (16)
Total Expenditure 3,953 4,022 (69) 88,591 69,355 19,236 311,537 311,671 (134)
INCOME
Asset Sustainability
Executive Director Douglas Hendry 0 0 0 0 0 0 0 0 0
Executive Director Kirsty Flanagan 0 0 0 (1,432) (1,432) 0 (1,432) (1,432) 0
Asset Sustainability Total 0 0 0 (1,432) (1,432) 0 (1,432) (1,432) 0
Service Development Projects
Executive Director Douglas Hendry 0 (38) 38 0 0 0 (7,771) (7,771) 0
Executive Director Kirsty Flanagan (61) (69) 8 (4,046) (4,046) 0 (21,135) (21,135) 0
Service Development Total (61) (107) 46 (4,046) (4,046) 0 (28,906) (28,906) 0
Strategic Change Projects
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary 0 0 0 0 0 0 (137) (137) 0
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (138) (138) 0 (33,664) (33,664) 0 (91,292) (91,292) 0
01 TIF - Lorn/Kirk Road 0 0 0 (699) (699) 0 (2,717) (2,717) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (195) (195) 0 (6,493) (6,493) 0
HWD - FFE (Funded by LA) 0 0 0 0 0 0 (350) (350) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Strategic Change Total (138) (138) 0 (34,558) (34,558) 0 (103,812) (103,812) 0
Total Income (199) (245) 46 (40,036) (40,036) 0 (134,150) (134,150) 0
Net Total 3,754 3,777 (23) 48,555 29,319 19,236 177,387 177,521 (134)
Appendix 7
Full Year This Financial Year Total Project Costs
30 June 2022

Page 76

MONITORING REPORT
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget
Year End
Forecast
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Flood Prevention 2 2 0 474 474 0 1,084 1,084 0
Coastal Protection 0 0 0 20 20 0 200 200 0
Coastal Change Adaptation 0 0 0 159 159 0 159 159 0
Bute Sea Wall Repairs 0 0 0 750 750 0 750 750 0
Helensburgh Flood Mitigation 0 0 0 432 432 0 432 432 0
Bridge Strengthening 29 29 0 1,349 1,349 0 2,049 2,049 0
Local Bridge Maintenance Fund 2 2 0 1,237 1,237 0 5,447 5,447 0
Roads Reconstruction 0 0 0 8,475 8,475 0 15,336 15,336 0
Roads Reconstruction - Helensburgh CHORD 0 0 0 47 47 0 47 47 0
Roads Reconstruction - Oban CHORD 0 0 0 3 3 0 3 3 0
Helensburgh CHORD - Signage etc 0 0 0 10 10 0 10 10 0
Lighting 0 0 0 740 740 0 1,040 1,040 0
Environmental Projects 0 0 0 734 734 0 934 934 0
Play Park Refurbishment 0 0 0 155 155 0 155 155 0
Public Convenience Upgrades 0 0 0 82 82 0 82 82 0
Footway Improvements 0 0 0 269 269 0 269 269 0
Glengorm - Capping 0 0 0 82 82 0 82 82 0
Glengorm - Cell and Transfer Station (PB) 18 18 0 560 560 0 560 560 0
EV Quick Chargers 0 0 0 93 93 0 93 93 0
Tobermory Car Park 52 52 0 951 951 0 951 951 0
Active Travel 0 0 0 500 500 0 500 500 0
Bin Replacement Programme 0 0 0 100 100 0 100 100 0
Server Sustainability 4 4 0 187 187 0 251 251 0
PC Replacement 445 445 0 522 522 0 522 522 0
Telecomms Network 2 2 0 98 98 0 98 98 0
Block Allocation - ICT 0 0 0 0 0 0 1,690 1,690 0
Asset Sustainability Total 554 554 0 18,029 18,029 0 32,844 32,844 0
Service Development Projects
Preliminary design for  Regional Transport projects 0 0 0 16 16 0 221 221 0
Campbeltown Old Quay 0 0 0 43 43 0 1,424 1,424 0
Fleet Management - Prudential Borrowing 0 0 0 2,187 2,187 0 4,861 4,861 0
Fleet Management 0 0 0 0 0 0 2,859 2,859 0
Lismore Ferry 13 19 (6) 13 19 (6) 666 672 (6)
Millpark Depot Demolition 0 0 0 0 0 0 126 126 0
Oban Depot Development Project 0 15 (15) 0 15 (15) 2,100 2,115 (15)
Lochgilphead Depot Rationalisation 0 0 0 (10) 0 (10) 19 29 (10)
Jackson's Quarry Refurbishment 0 0 0 (2) 0 (2) 283 285 (2)
Witchburn Road Demolition 0 0 0 (1) 0 (1) 157 158 (1)
Safe Streets, Walking and Cycling (CWSS) 0 0 0 544 544 0 2,878 2,878 0
SPT - bus infrastructure 0 0 0 0 0 0 1,405 1,405 0
Cycleways - H&L (FSPT) 0 0 0 240 240 0 3,112 3,112 0
Helensburgh Public Realm - Arts Strategy Fund 0 0 0 51 51 0 53 53 0
Town Centre Funds 286 287 (1) 1,054 1,055 (1) 3,876 3,877 (1)
Dunoon Cycle Bothy 7 7 0 266 266 0 279 279 0
Dunoon STEM Hub 10 10 0 603 603 0 608 608 0
Ardrishaig North Active Travel 0 0 0 880 880 0 880 880 0
Nature Restoration Fund 0 0 0 346 346 0 346 346 0
Gibraltar Street Public Realm Improvements 5 5 0 248 248 0 250 250 0
Hermitage Park 0 0 0 69 69 0 3,314 3,314 0
Applications Projects 94 94 0 757 757 0 2,883 2,883 0
Service Development Total 415 437 (22) 7,304 7,339 (35) 32,600 32,635 (35)
Strategic Change Projects
Campbeltown Flood Scheme 23 23 0 10,354 9,098 1,256 15,215 15,215 0
Street Lighting LED Replacement 0 0 0 791 791 0 3,900 3,900 0
Harbour Investment Programme 138 138 0 33,664 15,550 18,114 91,292 91,292 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - North Pier Extension 0 0 0 0 0 0 214 214 0
TIF - Oban Airport Business Park 0 0 0 101 101 0 590 590 0
TIF - Halfway House Roundabout 0 0 0 597 597 0 640 640 0
Strategic Change Total 161 161 0 45,508 26,138 19,370 114,021 114,021 0
Total Expenditure 1,130 1,152 (22) 70,841 51,506 19,335 179,465 179,500 (35)
INCOME
Asset Sustainability
EV Quick Chargers 0 0 0 (97) (97) 0 (97) (97) 0
Glengorm Capping/New Cell - Prudential Borrowing 0 0 0 (560) (560) 0 (560) (560) 0
Tobermory Car Park 0 0 0 (775) (775) 0 (775) (775) 0
Asset Sustainability Total 0 0 0 (1,432) (1,432) 0 (1,432) (1,432) 0
Service Development Projects
Applications Projects 0 0 0 (46) (46) 0 (437) (437) 0
Safe Streets, Walking and Cycling 0 0 0 (550) (550) 0 (2,483) (2,483) 0
SPfT 0 0 0 0 0 0 (1,243) (1,243) 0
Cycleways - H&L (FSPT) 0 0 0 (240) (240) 0 (3,212) (3,212) 0
Town Centre Funds 0 0 0 (382) (382) 0 (1,794) (1,794) 0
Dunoon STEM Hub 0 0 0 (100) (100) 0 (608) (608) 0
Ardrishaig North Active Travel (50) (50) 0 (50) (50) 0 (50) (50) 0
Dunoon Cycle Bothy 0 0 0 (209) (209) 0 (279) (279) 0
Gibraltar Street Public Realm Improvements 0 0 0 0 0 0 (250) (250) 0
Hermitage Park 0 0 0 0 0 0 (3,245) (3,245) 0
Fleet Management - PB 0 0 0 (2,187) (2,187) 0 (4,861) (4,861) 0
Fleet Management 0 (8) 8 0 0 0 0 0 0
Lochgilphead Depot Rationalisation 0 0 0 (1) (1) 0 (1) (1) 0
Millpark Depot Demolition Insurance 0 0 0 0 0 0 (53) (53) 0
Oban Depot - Mill Park Insurance Claim 0 0 0 0 0 0 (1,681) (1,681) 0
Oban Depot - Appin Depot Sale 0 0 0 (150) (150) 0 (150) (150) 0
Lismore Ferry (11) (11) 0 (131) (131) 0 (631) (631) 0
Witchburn Road Demolition 0 0 0 0 0 0 (157) (157) 0
Service Development Total (61) (69) 8 (4,046) (4,046) 0 (21,135) (21,135) 0
Strategic Change Projects
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (138) (138) 0 (33,664) (33,664) 0 (91,292) (91,292) 0
01 TIF - Lorn/Kirk Road 0 0 0 (699) (699) 0 (2,717) (2,717) 0
Strategic Change Total (138) (138) 0 (34,363) (34,363) 0 (94,279) (94,279) 0
Total Income (199) (207) 8 (39,841) (39,841) 0 (116,846) (116,846) 0
Net Departmental Total 931 945 (14) 31,000 11,665 19,335 62,619 62,654 (35)
30 June 2022
Full Year This Financial Year Total Project Costs
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR KIRSTY FLANAGAN
Appendix 7

Page 77

MONITORING REPORT
Budget Actual Variance Budget Forecast Variance Budget Forecast Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability
Education 383 383 0 4,281 4,281 0 10,761 10,761 0
Live Argyll 21 68 (47) 1,227 1,283 (56) 2,086 2,142 (56)
Health and Social Care Partnership 0 0 0 2,053 2,055 (2) 2,922 2,924 (2)
Shared Offices 11 11 0 2,469 2,469 0 3,263 3,263 0
Asset Sustainability Total 415 462 (47) 10,030 10,088 (58) 19,032 19,090 (58)
Service Development Projects
Ardrishaig Primary Pre 5 Unit 0 0 0 0 0 0 2 2 0
Bowmore Primary School - Pre 5 Unit 0 0 0 0 0 0 149 149 0
Clyde Cottage - 600 hour provision 0 0 0 23 23 0 579 579 0
Craignish Primary School - Pre 5 Extension 0 0 0 0 0 0 400 400 0
Iona Primary School - Pre 5 Unit 0 0 0 0 0 0 490 490 0
Islay High and Rosneath Primary School Pitches 0 0 0 (12) 0 (12) 707 719 (12)
Lochgoilhead Primary School - Pre 5 Unit 0 0 0 0 0 0 391 391 0
Park Primary Extension/Pre Fives Unit 0 0 0 0 0 0 341 341 0
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 491 491 0
Bunessan Primary School - Gaelic Medium Improvements 0 0 0 0 0 0 120 120 0
Early Learning and Childcare 0 0 0 0 0 0 850 850 0
Early Learning and Childcare - 1140 Hours 254 254 0 1,036 1,036 0 7,751 7,751 0
CO2 Monitoring - Covid Mitigation in Schools 0 0 0 116 116 0 192 192 0
Early Learning and Childcare - 1140 Hours - CFCR 0 0 0 0 0 0 111 111 0
Bowmore Primary School - Gaelic Medium Grant 0 0 0 38 38 0 38 38 0
Riverside Leisure Centre Refurbishment 0 0 0 (13) 0 (13) 1,232 1,245 (13)
Dunclutha Childrens Home 0 0 0 54 54 0 1,300 1,300 0
Service Development Total 254 254 0 1,242 1,267 (25) 15,144 15,169 (25)
Strategic Change Projects
Campbeltown Schools Redevelopment 38 38 0 76 76 0 2,130 2,130 0
Dunoon Primary 257 257 0 304 304 0 10,869 10,869 0
Replacement of Oban High 96 96 0 136 136 0 3,250 3,250 0
Kirn Primary School 65 65 0 99 99 0 10,119 10,119 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Carbon Management Business Cases 0 0 0 60 60 0 261 261 0
NPDO Schools Solar PV Panel Installations 0 0 0 183 183 0 944 944 0
Non NPDO Schools Solar PV Panel Installations 0 0 0 88 88 0 488 488 0
Carbon Management Fuel Conversions 0 0 0 0 0 0 107 107 0
Carbon Management Capital Property Works 2016/17 0 0 0 20 20 0 39 39 0
Carbon Management - Group Heating Conversion Project 0 0 0 10 10 0 1,948 1,948 0
Kilmory Biomass  Carbon Management 0 0 0 0 0 0 956 956 0
Oil to Gas Heating Conversions 0 0 0 5 5 0 187 187 0
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 0 0 0 310 310 0 11,838 11,838 0
Clean Energy 0 0 0 551 567 (16) 729 745 (16)
Clean Energy 2022-23 0 0 0 500 500 0 500 500 0
CHORD Oban 0 0 0 651 651 0 7,905 7,905 0
CHORD - Helensburgh 0 0 0 28 28 0 6,557 6,557 0
CHORD Dunoon 2 2 0 55 55 0 12,522 12,522 0
Helensburgh Waterfront Deveopment 1,696 1,696 0 2,895 2,895 0 22,557 22,557 0
HWD - FFE (Funded by LA) 0 0 0 344 344 0 350 350 0
Kilmory Business Park Phase 2AA 0 0 0 141 141 0 150 150 0
Dunoon Pier OBC 0 0 0 0 0 0 2,844 2,844 0
Strategic Change Total 2,154 2,154 0 6,478 6,494 (16) 97,896 97,912 (16)
Total Expenditure 2,823 2,870 (47) 17,750 17,849 (99) 132,072 132,171 (99)
INCOME
Asset Sustainability
Education 0 0 0 0 0 0 0 0 0
Live Argyll 0 0 0 0 0 0 0 0 0
Asset Sustainability Total 0 0 0 0 0 0 0 0 0
Service Development Projects
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 (485) (485) 0
Bunessan Primary School - Gaelic Medium Improvements 0 0 0 0 0 0 (30) (30) 0
Early Learning and Childcare 0 0 0 0 0 0 (918) (918) 0
Early Years 1140 Hours 0 0 0 0 0 0 (6,300) (6,300) 0
CO2 Monitoring - Covid Mitigation in Schools 0 (38) 38 0 0 0 0 0 0
Bowmore Primary School - Gaelic Medium Grant 0 0 0 0 0 0 (38) (38) 0
Service Development Total 0 (38) 38 0 0 0 (7,771) (7,771) 0
Strategic Change
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary School 0 0 0 0 0 0 (137) (137) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (195) (195) 0 (6,493) (6,493) 0
HWD - FFE (Funded by LA) 0 0 0 0 0 0 (350) (350) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Strategic Change Total 0 0 0 (195) (195) 0 (9,533) (9,533) 0
Total Income 0 (38) 38 (195) (195) 0 (17,304) (17,304) 0
Net Departmental Total 2,823 2,832 (9) 17,555 17,654 (99) 114,768 114,867 (99)
30 June 2022
Total Project CostsFull Year This Financial YearCurrent Financial Year To Date
Appendix 7
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR DOUGLAS HENDRY

Page 78

CAPITAL PLAN 2022-23 APPENDIX 8
Overall Summary
Service
Previous Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Education 36,575 6,097 4,843 2,226 0 0 49,741
Shared Offices 16,687 4,197 544 428 0 0 21,856
ICT 2,126 1,564 983 771 0 0 5,444
RIS 21,128 44,907 35,682 40,768 17,811 0 160,296
DEG 15,435 5,000 180 0 0 0 20,615
HSCP 1,246 2,107 441 428 0 0 4,222
Live Argyll 1,274 1,235 431 428 0 0 3,368
CHORD 48,486 4,114 285 0 0 0 52,885
Overall Total 142,957 69,221 43,389 45,049 17,811 0 318,427

Page 79

CAPITAL PLAN 2022-23 APPENDIX 8
Education
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability Education Asbestos Control/Removal Works 0 7 0 0 0 0 7
Block Allocation - Education 0 3,216 4,231 2,226 0 0 9,673
Digital Inclusion 20-21 0 9 0 0 0 0 9
Free School Meals 0 14 0 0 0 0 14
Homeless Houses - Housing Quality Standard 0 1 0 0 0 0 1
Internal Refurbishment Budget 0 7 0 0 0 0 7
Lochgilphead Primary School Demolition 0 7 0 0 0 0 7
Pre-5's/Nurseries 0 1 0 0 0 0 1
Primary Schools 0 530 23 0 0 0 553
School Houses - Housing Quality Standard 0 26 0 0 0 0 26
Secondary Schools 0 463 0 0 0 0 463
Asset Sustainability Total 0 4,281 4,254 2,226 0 0 10,761
Service Development Education Ardrishaig Primar School - Pre Five Extension 2 0 0 0 0 0 2
Bowmore Primary School - Gaelic Medium Grant 0 38 0 0 0 0 38
Bowmore Primary School - Pre Five Unit 149 0 0 0 0 0 149
Bunessan Primary School - Gaelic Medium Improvements 120 0 0 0 0 0 120
Clyde Cottage - 600 hours provision 556 23 0 0 0 0 579
CO2 Monitoring - Covid Mitigation in Schools 76 116 0 0 0 0 192
Craignish Primary School - Pre Five Extension (600 hours funding) 400 0 0 0 0 0 400
Early Learning and Childcare 850 0 0 0 0 0 850
Early Learning and Childcare - 1140 Hours 6,696 1,036 19 0 0 0 7,751
Early Learning and Childcare - 1140 Hours - CFCR 111 0 0 0 0 0 111
Iona Primary School - Pre Five Unit (600 hours funding) 490 0 0 0 0 0 490
Islay High & Rosneath PS Pitches 719 -12 0 0 0 0 707
Lochgoilhead Primary School - Pre Five Unit (600 hours funding) 391 0 0 0 0 0 391
Park Primary Extension and Pre Fives Unit 341 0 0 0 0 0 341
Sandbank Gaelic Pre Five Unit 491 0 0 0 0 0 491
Service Development Total 11,392 1,201 19 0 0 0 12,612
Strategic Change Education Campbeltown Schools Redevelopment 2,054 76 0 0 0 0 2,130
Dunoon Primary School 10,365 304 200 0 0 0 10,869
Kirn Primary School 10,020 99 0 0 0 0 10,119
Replacement of Oban High School 2,744 136 370 0 0 0 3,250
Strategic Change Total 25,183 615 570 0 0 0 26,368
Overall Total 36,575 6,097 4,843 2,226 0 0 49,741

Page 80

CAPITAL PLAN 2022-23 APPENDIX 8
Shared Office
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability Shared Offices Argyll House, Dunoon 0 12 0 0 0 0 12
Asbestos Capital Property Works 0 51 0 0 0 0 51
Block Allocation 0 0 236 398 0 0 634
Bowmore Area Office 0 76 0 0 0 0 76
Burnett Building 0 110 0 0 0 0 110
Capital Property Works 0 38 0 0 0 0 38
Fire Risk Assessment Works 0 14 0 0 0 0 14
Hill Street Dunoon Rewire 0 33 0 0 0 0 33
Kilmory Castle 0 1,368 43 0 0 0 1,411
Legionella Control Works 0 215 0 0 0 0 215
Manse Brae District Office 0 1 0 0 0 0 1
Manse Brae Roads Office 0 2 0 0 0 0 2
Our Modern Workspace 0 549 87 30 0 0 666
Asset Sustainability Total 0 2,469 366 428 0 0 3,263
Strategic Change Shared Offices Campbeltown Office Rationalisation 595 1 0 0 0 0 596
Carbon Management - Group Heating Conversion Project (Prudential Borrowing)1,938 10 0 0 0 0 1,948
Carbon Management Business Cases (FPB) 201 60 0 0 0 0 261
Carbon Management Capital Property Works 16/17 19 20 0 0 0 0 39
Carbon Management Fuel Conversions (FPB) 107 0 0 0 0 0 107
Cleaner Energy 0 551 178 0 0 0 729
Cleaner Energy 2022-23 0 500 0 0 0 0 500
Helensburgh Office Rationalisation  (FPB,REC) 11,528 310 0 0 0 0 11,838
Kilmory Biomass Project OBC (FPB,REV) 956 0 0 0 0 0 956
Non-NPDO Schools PV Panel Installations 400 88 0 0 0 0 488
NPDO Schools Solar PV Panel Installations 761 183 0 0 0 0 944
Oil to Gas Heating Conversions (FPB) 182 5 0 0 0 0 187
Strategic Change Total 16,687 1,728 178 0 0 0 18,593
Overall Total 16,687 4,197 544 428 0 0 21,856

Page 81

CAPITAL PLAN 2022-23 APPENDIX 8
Major Projects
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Strategic Change CHORD CHORD - Dunoon 12,467 55 0 0 0 0 12,522
CHORD - Helensburgh -Public Realm Imprv 6,529 28 0 0 0 0 6,557
CHORD - Oban 7,254 651 0 0 0 0 7,905
Helensburgh Waterfront Development 19,377 2,895 285 0 0 0 22,557
HWD - FFE 6 344 0 0 0 0 350
Kilmory Business Park Phase 2AA 9 141 0 0 0 0 150
OBC for Dunoon Pier 2,844 0 0 0 0 0 2,844
Strategic Change Total 48,486 4,114 285 0 0 0 52,885
Overall Total 48,486 4,114 285 0 0 0 52,885

Page 82

CAPITAL PLAN 2022-23 APPENDIX 8
ICT
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability ICT Block Allocation - ICT 0 0 919 771 0 0 1,690
PC Replacement 0 522 0 0 0 0 522
Server Sustainability 0 187 64 0 0 0 251
Telecomms Network 0 98 0 0 0 0 98
Asset Sustainability Total 0 807 983 771 0 0 2,561
Service Development ICT Applications Projects 2,126 757 0 0 0 0 2,883
Service Development Total 2,126 757 0 0 0 0 2,883
Overall Total 2,126 1,564 983 771 0 0 5,444

Page 83

CAPITAL PLAN 2022-23 APPENDIX 8
Roads and Infrastructure Services
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability RIS Bin Replacement Programme 0 100 0 0 0 0 100
Bridge Strengthening 0 1,349 350 350 0 0 2,049
Bute Sea Wall Repairs 0 750 0 0 0 0 750
Coastal Change Adaptation 0 159 0 0 0 0 159
Coastal Protection 0 20 80 100 0 0 200
Environmental Projects 0 734 100 100 0 0 934
EV Quick Chargers 0 93 0 0 0 0 93
Flood Prevention 0 474 305 305 0 0 1,084
Footway Improvements 0 269 0 0 0 0 269
Glengorm - Capping 0 82 0 0 0 0 82
Glengorm - Cell and Transfer Station (PB) 0 560 0 0 0 0 560
Helensburgh CHORD - Signage etc 0 10 0 0 0 0 10
Helensburgh Flood Mitigation 0 432 0 0 0 0 432
Investment in Active Travel 0 500 0 0 0 0 500
Lighting 0 740 150 150 0 0 1,040
Local Bridge Maintenance Fund 0 1,237 4,210 0 0 0 5,447
Play Park Renewal 0 155 0 0 0 0 155
Public Convenience Upgrades 0 82 0 0 0 0 82
Roads Reconstruction 0 8,475 3,449 3,412 0 0 15,336
Roads Reconstruction - Helensburgh CHORD 0 47 0 0 0 0 47
Roads Reconstruction - Oban CHORD 0 3 0 0 0 0 3
Tobermory Car Park 0 951 0 0 0 0 951
Asset Sustainability Total 0 17,222 8,644 4,417 0 0 30,283
Service Development RIS Campbeltown Old Quay 1,381 43 0 0 0 0 1,424
Fleet Management 2,859 0 0 0 0 0 2,859
Fleet Management - Prudential Borrowing 2,674 2,187 0 0 0 0 4,861
Jackson's Quarry Refurbishment 285 -2 0 0 0 0 283
Lismore Ferry Replacement 618 13 15 20 0 0 666
Lochgilphead Depot Rationalisation 29 -10 0 0 0 0 19
Mill Park Depot Demolition 126 0 0 0 0 0 126
Oban Depot Development 2,100 0 0 0 0 0 2,100
Preliminary design for  Regional Transport projects (tif) 205 16 0 0 0 0 221
Witchburn Road Demolition 158 -1 0 0 0 0 157
Service Development Total 10,435 2,246 15 20 0 0 12,716
Strategic Change RIS Campbeltown Flood Scheme 878 9,098 3,908 1,331 0 0 15,215
Harbour Investment Programme PB 6,706 15,550 23,115 35,000 17,811 0 98,182
Street Lighting LED Replacement 3,109 791 0 0 0 0 3,900
Strategic Change Total 10,693 25,439 27,023 36,331 17,811 0 117,297
Overall Total 21,128 44,907 35,682 40,768 17,811 0 160,296

Page 84

CAPITAL PLAN 2022-23 APPENDIX 8
Development and Economic Growth
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Service Development DEG Ardrishaig North Active Travel 0 880 0 0 0 0 880
Cycleways - H&L (FSPT) 2,722 240 150 0 0 0 3,112
Dunoon Cycle Bothy 13 266 0 0 0 0 279
Dunoon STEM Hub 5 603 0 0 0 0 608
Gibraltar Street Public Realm Improvements 2 248 0 0 0 0 250
Helensburgh Public Realm - Arts Strategy Fund 2 51 0 0 0 0 53
Hermitage Park 3,245 69 0 0 0 0 3,314
Nature Restoration Fund 0 346 0 0 0 0 346
Safe Streets, Walking and Cycling (CWSS) 2,334 544 0 0 0 0 2,878
SPT - bus infrastructure 1,405 0 0 0 0 0 1,405
Town Centre Funds 2,792 1,054 30 0 0 0 3,876
Service Development Total 12,520 4,301 180 0 0 0 17,001
Strategic Change DEG 01 TIF - Lorn/Kirk Road 2,169 1 0 0 0 0 2,170
05 TIF - North Pier Extension 214 0 0 0 0 0 214
09 TIF - Oban Airport Business Park 489 101 0 0 0 0 590
TIF - Halfway House Roundabout 43 597 0 0 0 0 640
Strategic Change Total 2,915 699 0 0 0 0 3,614
Overall Total 15,435 5,000 180 0 0 0 20,615

Page 85

CAPITAL PLAN 2022-23 APPENDIX 8
Health & Social Care Partnership
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability HSCP Ardfenaig 0 125 0 0 0 0 125
Block Allocation 0 390 431 428 0 0 1,249
Capital Property Works 0 139 0 0 0 0 139
Digitalising telecare 0 100 0 0 0 0 100
Eadar Glinn 0 196 0 0 0 0 196
Glencruitten Hostel 0 36 0 0 0 0 36
Gortonvogie 0 80 0 0 0 0 80
Greenwood/Woodlands 0 224 0 0 0 0 224
Kilmory Castle Top Floor Toilet Refurb 0 -2 0 0 0 0 -2
Lochgilphead Resource Centre 0 16 0 0 0 0 16
Struan Lodge Boiler 0 252 0 0 0 0 252
Thomson Home Rothesay 0 125 0 0 0 0 125
Tigh An Rudha HFE 0 372 10 0 0 0 382
Asset Sustainability Total 0 2,053 441 428 0 0 2,922
Service Development HSCP Dunclutha Childrens Home 1,246 54 0 0 0 0 1,300
Service Development Total 1,246 54 0 0 0 0 1,300
Overall Total 1,246 2,107 441 428 0 0 4,222

Page 86

CAPITAL PLAN 2022-23 APPENDIX 8
Live Argyll
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability Live Argyll Aqualibrium 0 28 0 0 0 0 28
Campbeltown Museum - Burnet Bldg 0 38 0 0 0 0 38
Capital Property Works 0 1,031 431 428 0 0 1,890
Inveraray CARS 0 21 0 0 0 0 21
Kintyre Community Education Centre - Lift Shaft Refurbishment 0 -12 0 0 0 0 -12
Lochgilphead Library Relocation 0 20 0 0 0 0 20
Riverside Leisure Centre - Cladding Upgrade 0 46 0 0 0 0 46
Riverside Leisure Centre - Spa Pool Upgrade 0 20 0 0 0 0 20
Rothesay Swimming Pool 0 27 0 0 0 0 27
The Moat Centre - Gym Store 0 -2 0 0 0 0 -2
Victoria Halls, Helensburgh 0 10 0 0 0 0 10
Asset Sustainability Total 0 1,227 431 428 0 0 2,086
Service Development Live Argyll Riverside Leisure Centre Refurbishment 1,245 -13 0 0 0 0 1,232
Service Development Total 1,245 -13 0 0 0 0 1,232
Strategic Change Live Argyll Carbon Management 29 21 0 0 0 0 50
Strategic Change Total 29 21 0 0 0 0 50
Overall Total 1,274 1,235 431 428 0 0 3,368

Page 87

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 11 AUGUST 2022 
TREASURY MANAGEMENT MONITORING REPORT – 30 JUNE 2022 
1. EXECUTIVE SUMMARY 
1.1. This report sets out the Council’s treasury management position for the period 1 April
2022 to 30 June 2022 and includes information on: 
 Overall borrowing position
 Borrowing activity
 Investment activity
 Economic background
 Interest rate forecast
 Prudential Indicators 
1.2. Estimated borrowing is below the Capital Financing Requirement for the period to 30
June 2022, at this stage in the financial year capital expenditure is below target. Due
to delays caused by the COVID-19 pandemic capital expenditure has been relatively
low over the last twelve months however there is an expectation this will increase back
up again over 2022-23 which will continue to be monitored closely.  
1.3. The net movement in external borrowing in the period 1 April 2022 to 30 June 2022
was a decrease of £10.861m. 
1.4. The levels of investments were £117.9m at 30 June 2022. The rate of return achieved
was 1.351% which compares favourably with the target SONIA rate which was 
1.064%. 
1.5 The Council has significant cash balances which are invested in accordance with its
Annual Treasury Management Strategy on the basis of security first, liquidity second
and then return. The high cash levels are largely due to significant COVID-19 funding
received from the Scottish Government at the end of 2020-21 and in to 2021-22 which
the Council has committed for specific COVID-19 purposes in addition to slippage
within the capital programme resulting in a slower rate of spend.

Page 88

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 11 AUGUST 2022 
TREASURY MANAGEMENT MONITORING REPORT – 30 JUNE 2022 
2. INTRODUCTION 
2.1. This report sets out the Council’s treasury management position for the period 1
April 2022 to 30 June 2022 and includes information on: 
 Overall borrowing position
 Borrowing activity
 Investment activity
 Economic background
 Interest rate forecast
 Prudential Indicators 
3. DETAIL
Overall Borrowing Position 
3.1. The table below details the estimated capital financing requirement (CFR) and
compares this with the estimated level of external debt at 31 March 2022. The CFR
represents the underlying need for the Council to borrow to fund its fixed assets and
accumulated capital expenditure. 
Forecast Forecast Forecast  
2022/23 2023/24 2024/25  
£000 £000 £000
CFR at 1 April  309,092 333,454 348,569
Net Capital Expenditure 34,530 26,502 28,227
Less Loans Fund Principal Repayments (5,353) (5,507) (5,788)
Less: NPDO Repayment (4,815) (5,880) (6,038)
Estimated CFR 31 March  333,454 348,569 364,970
Less Funded by NPDO (116,681) (117,064) (112,184)
Estimated Net CFR 31 March  216,773 231,505 252,786
Estimated External Borrowing at 31
March 
212,431 236,654 256,650
Gap 4,342 (5,149) (3,864)

Page 89

3.2. Borrowing is below the Capital Financing Requirement for the period to 30 June 2022.
Whilst borrowing rates are still comparatively low the Council has significant cash
balances which reduces the need to borrow in the short term. 
3.3. The Council’s Treasury Management Strategy states that any decision to borrow in
advance will be within forward approved Capital Financing Requirement estimates. 
3.4. The Council’s estimated net capital financing requirement at 30 June 2022 is £216.8m.
The table below shows how this has been financed. £167.1m is funded by loans and
there are substantial internal balances of £167.6m of which £117.9m are currently
invested, as detailed in section 3.7, leaving a net internal balance of £49.7m. 
Position at
31/03/22
Position at
30/06/22  
£000 £000
Loans 177,934 167,072
Net Internal Balances -5,505 49,701
Total CFR 172,429 216,773 
3.5. During the period from 1 April to 30 June 2022, £10.892m of loans were repaid and 0.031m of
new borrowing was taken.  £10m of temporary borrowing had been taken out prior to the year-
end to fund short term cash flow pressures therefore this accounts for the majority of the loan
repayment figure. The analysis of the movement in borrowing is shown in the table below: 
Actual    
£000
External Loans Repaid 1st April 2022 to 30th June
2022 (10,892)
Borrowing undertaken  1st April 2022 to 30th June 2022 31
Net Movement in External Borrowing   (10,861) 
3.6. The table below summarises the movement in the level and rate of temporary
borrowing at the start and end of the period. 
£000 % Rate
Temp borrowing at 31st March 2022 10,500 0.22%
Temp borrowing at 30th June 2022 518 0.55%

Page 90

Investment Activity
3.8  The average rate of return achieved in the Council’s investments to 30 June 2022  was
1.351% compared to the SONIA (Sterling Overnight Index Average) rate for the same period
of 1.064% which demonstrates that the Council continues to achieve a reasonable rate
of return on its cash investments. At 30 June 2022 the Council had £117.9m of short
term investments at an average rate of 1.351%. The table below details the
counterparties that the investments were placed with, the maturity date, the interest rate
and the credit rating applicable for each counterparty. 
Counterparty Maturity Amount £000 Interest Rate Rating  S&P
Clydesdale Bank Instant 5,384 1.15% Short Term A-2, Long
Santander 180 Day 5,000 0.67% Short Term A-1, Long
Clydesdale Bank 20/09/2022 5,000 1.60% Short Term A-2, Long
AL Ryan Bank 02/08/2022 5,000 0.59% Short Term A-1, Long
Toronto Dominion Bank 13/10/2022 5,000 0.50% Short Term A-1+,
Close Bros 29/07/2022 2,500 0.55% Short Term A-1, Long
National Bank of Kuwait 11/04/2023 7,500 2.08% Short Term A-1, Long
National Bank of Kuwait 17/11/2022 5,000 1.70% Short Term A-1, Long
Qatar National Bank 21/10/2022 5,000 1.49% Short Term A-1, Long
Qatar National Bank 13/12/2022 5,000 1.94% Short Term A-1, Long
Qatar National Bank 10/11/2022 5,000 1.67% Short Term A-1, Long
AL Ryan Bank 07/12/2022 5,000 1.70% Short Term A-1, Long
FADB 10/08/2022 5,000 0.24% Short Term A-1+,
FADB 20/01/2023 5,000 1.00% Short Term A-1+,
FADB 10/05/2023 5,000 2.11% Short Term A-1+,
London Borough of Croydon 22/07/2022 5,000 1.65% AA
London Borough of Croydon 22/08/2022 2,500 1.65% AA
Rotherham Metropolitan Borough Council 10/10/2022 7,500 0.90% AA
Slough Borough Council 26/05/2023 5,000 2.10% AA
Cheshire West & Chester Council 12/01/2023 2,500 0.90% AA
Slough Borough Council 29/06/2023 5,000 2.10% AA
MMF - BNP Paribas Call 9,000 1.24% AAA
MMF - Legal and General Call 6,000 1.10% AAA
Total 117,884

Page 91

3.9 All investments and deposits are in accordance with the Council’s approved list of
counterparties and within the limits and parameters defined in the Treasury
Management Practices. The counterparty list is constructed based on assessments
by leading credit reference agencies adjusted for additional market information
available in respect of counterparties. 
3.10 The Council has significant cash balances which are invested in accordance with its
Annual Treasury Management Strategy. This is largely due to significant COVID-19
funding received from the Scottish Government at the end of 2020-21and in to 2021-
22 which the Council has committed for specific COVID-19 purposes. These cash
balances are in excess of what is required for normal operating purposes but the
economic environment for investments has improved over the last few months with an
increase in interest rates, making investing these monies easier than in previous
years.
Economic and Interest Rate Forecasts 
3.11 The latest economic background is shown in Appendix 1 with the interest rate forecast
in Appendix 2.
Prudential Indicators 
3.12 The prudential indicators for 2022-23 are attached in Appendix 3. 
4. CONCLUSION 
4.1 In the period from 1 April 2022 to 30 June 2022, the Council’s borrowing decreased
by £10.861m, it is currently below the Capital Financing Requirement. There are
substantial internal balances, of which £117.9m is currently invested. The investment
returns were 1.351% which is above the SONIA target of 1.064%. 
5. IMPLICATIONS 
5.1 Policy –       None.  
5.2 Financial –      Complies with Annual Treasury Strategy.
5.3  Legal –       None.
5.4 HR –       None.
5.5 Fairer Duty Scotland –     None. 
5.5.1 Equalities – protected characteristics –  None.
5.5.2 Socio-economic Duty –    None.
5.5.3 Islands –      None.
5.6  Climate Change –     None.
5.7 Risk –       None.
5.8 Customer Service –     None. 
Kirsty Flanagan
Section 95 Officer
8 July 2022 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney

Page 92

Appendix 1 – Economic Background
Appendix 2 – Interest Rate Forecast
Appendix 3 – Prudential Indicators 
For further information contact Anne Blue, Head of Financial Services 
anne.blue@argyll-bute.gov.uk

Page 93

Appendix 1 – Economics Update (at 06-07-22)
This section has been provided by Link Asset Services and therefore includes their views
and opinions of future trends and events. 
 The second quarter of 2022 saw:
 GDP fall by 0.1% m/m in March and by 0.3% m/m in April;
 An easing rather than a collapse in the composite Purchasing Managers Index (PMI); 
 A further rise in Consumer Price Index (CPI) inflation to a new 40-year high of 9.1% in May; 
 The first signs that the weakening in economic activity is filtering into a slightly looser labour
market;
 Bank Rate rise to 1.25%, taking it to its highest level since the Global Financial Crisis;
 Gilt yields caught up in the global surge in bond yields triggered by May’s strong rise in US
inflation;
 Rising global bond yields and concerns over growth drive a global sell-off in equity markets.
 Following the 0.1% m/m fall in GDP in March and the 0.3% m/m contraction in April, the
economy is now moving towards a recession (two quarters of falling output in a row). Indeed,
GDP would need to rise by 0.4-0.5% m/m in both May and June to prevent the economy from
contracting in Q2 as a whole. That said, without the joint wind down of the COVID-19 Test and
Trace and vaccination programme, GDP would have risen by 0.2% m/m and 0.1% m/m in
March and April respectively. That’s hardly strong, but it suggests the underlying momentum is
not quite as weak as the headline figures imply. 
 There is not much evidence that higher inflation and higher interest rates have yet become a
big drag on activity. Services output did fall by 0.3% m/m in April. But output in consumer-
facing services, conversely, rose by a solid 2.3% m/m in April. And although the Office for
National Statistics (ONS) said that some of the 1.0% m/m fall in manufacturing output was
linked to the drag on activity from higher prices, it also said that some of the 0.4% m/m drop in
construction output in April was a drop back after the boost in the wake of February’s Storm
Eunice. 
 The fact that the composite PMI didn’t fall in June also suggests that in Q2 (Apr – June) real
GDP has softened rather than collapsed. The S&P Global/CIPS all-sector PMI for June was
unchanged from its level of 53.1 in May, signalling tepid but positive growth. According to the
Lloyd’s barometer, business confidence in May also remained remarkably resilient. 
 Despite the fall in the GfK composite measure of consumer confidence to a new record low of -
41 in June, April’s £1.4bn rise in consumer credit suggests households appear to have turned
to credit to support their spending as the cost-of-living squeeze has intensified. Meanwhile, the
household saving rate held steady at 6.8% in Q1 in line with its long-term average and we
expect households to lower their saving rate further when the bigger falls in real incomes come
in Q2 and Q3 to cushion the blow to spending. 
 The Chancellor’s latest fiscal support of £10.3bn (0.5% of GDP), which comprised £15.3bn of
handouts to households, partly funded by a £5bn tax on the profits of oil and gas producers,
will help support GDP in the second half of the year. And with the Prime Minister and the
Chancellor desperately needing to boost their popularity, some tax cuts may be announced in
the Autumn Budget.

Page 94

 There has been early signs that the recent weakening in economic activity is filtering through
into a slightly looser labour market. The unemployment rate edged up from 3.7% in the three
months to March to 3.8%. The single-month data showed that employment fell by 254,000 in
April and the unemployment rate rose from 3.5% to 4.2%. And the upward march in the
number of job vacancies slowed, with the three-month average only rising from 1.296m in April
to 1.300m in May. A seasonal adjustment of the single-month data implies that vacancies fell
in May for the first time since COVID-19 was rife in December. 
 At the same time, a 1.8% m/m fall back in average earnings in April meant that the 3myy rate
of earnings eased from 7.0% in March to 6.8% in April. And a lot of the 0.5% m/m rise in
earnings excluding bonuses was probably due to the 6.6% rise in the National Living Wage on
1st April. The 3myy rate of earnings excluding bonuses stayed at 4.2%. 
 That said, conditions in the labour market remain exceptionally tight. The unemployment rate
is still close to its recent 47-year low, and there is the same number of unemployed people as
job vacancies and at 6.8% in April, the 3myy rate of average earnings is at a 10-year high
(although it is still falling in real terms) and is well above the 3.0-3.5% that is broadly consistent
with the 2.0% inflation target (assuming that productivity growth is 1.0-1.5%).  
 CPI inflation rose from 9.0% in April to a new 40-year high of 9.1% in May and it is not yet
close to its peak. The increase in CPI inflation in May was mainly due to a further leap in food
price inflation from 6.7% to a 13-year high of 8.5%. With the influence of increases in
agricultural commodity prices yet to fully feed into prices on the supermarket shelves, we think
that food price inflation will rise above 10% in September. And with two-thirds of the
observation period for the Ofgem price cap having now passed, something like a 40% rise in
utility prices is pretty much baked in the cake for October. The further rise in core producer
price inflation, from 13.9% to 14.8%, suggests that core goods CPI inflation will probably rise
to 14% before long. We think that will take CPI inflation to a peak of around 10.5% in October. 
 The rise in services CPI inflation from 4.7% in April to 4.9% in May suggests that domestic
price pressures are still strengthening. 
 There now seems to be an even greater likelihood that second-round effects, whereby high
inflation feeds back into higher price and wage expectations, keep inflation higher for longer.
For some time, the Monetary Policy Committee (MPC) has placed a lot of weight on the results
of the Bank of England’s monthly Decision Maker Panel which asks businesses how they
expect to change their prices and wages over the next year. May’s survey revealed that
businesses still expect to raise their selling prices by 6.0% and their wages by 4.8% over the
next year. Meanwhile, XpertHR said that pay settlements across the economy stayed at a 30-
year high of 4.0% in May. The government appears to be contemplating raising public sector
pay by up to 5%. And the 7.1% pay rise granted to some railway workers sets a high bar for
the negotiations that led to train strikes across large parts of the country in mid-June. 
 The MPC has now increased interest rates five times in as many meetings and raised rates to
their highest level since the Global Financial Crisis. Even so, coming after the Fed raised rates
by 75 basis points (bps) in June and a handful of other central banks have recently raised
rates by 50bps, the Bank of England’s action is relatively dovish. The MPC’s decision not to
follow the Fed and raise rates by more makes some sense. The UK’s status as a larger
importer of commodities, which have jumped in price, means that households in the UK are
now facing a much larger squeeze on their real incomes. 
 But the MPC’s new guidance is that if there are signs of “more persistent inflationary
pressures” it will, “if necessary act forcefully in response”. We expect the MPC to continue to

Page 95

raise rates in steps of 25bps rather than 50bps. We think the MPC will raise rates from 1.25%
now to a peak of 2.75% next year. That’s higher than the peak of 2.00% forecast by
economists, but lower than the peak priced into the financial markets. 
 Gilt yields have been caught up in the global surge in bond yields triggered by the surprisingly
strong rise in CPI inflation in the US in May. The rises in two-year gilt yields (to a peak of
2.37% on 21st June) and 10-year yields (to a peak of 2.62%) took them to their highest level
since 2008 and 2014 respectively. And in response to signs that central banks (particularly the
US Fed) are going to raise interest rates faster to get on top of inflation, we now think that 10-
year gilt yields will reach a peak of 2.70% (up from 2.39% currently) this year and into 2023. 
 While the S&P 500 is 8.4% below its level a month ago, the FTSE 100 is 5.7% below it. Part of
the sell-off has been driven by the rapid rise in global bond yields and the resulting downward
pressure on equity valuations as well as concerns over economic growth. 
 Finally, the pound has already weakened from $1.37 and €1.21 earlier this year to $1.21 and
€1.16. A lot of these moves have been driven by concerns over the outlook for the global
economy and the resulting poor performance of risky assets, which has increased the demand
for the dollar relative to sterling. If interest rates rise faster and further in the US than in the UK,
rate differentials and a worsening in risk appetite will push the pound even lower, from $1.21
now to $1.18 by the end of 2022. We don’t expect the pound to fall by as much against the
euro (from €1.16 to €1.14 next year). But once global inflation and global interest rates peak,
the pound will probably benefit from the return of risk appetite. It may rise to $1.25 by the end
of 2023 and to $1.30 by the end of 2024. 
MPC meetings 5th May and 16th June 2022 
 After the Bank of England became the first major western central bank to put interest rates up
in this upswing in December, it has quickly followed up its first 0.15% rise by a further four
0.25% rises to 1.25%, in what is very likely to be a series of increases repeated throughout the
rest of 2022 and into 2023. 
 In May, the MPC voted 6-3 vote in favour of a 0.25% increase, but not only was this the first
time in its 25-year history that the MPC had raised rates at four meetings in a row but also
three members (Haskel, Mann and Saunders) wanted a 0.5% hike (up from none in March). 
However, GDP growth was forecast to drop to -0.25% in 2023 (+1.25% previously) and only
+0.25% in 2024 (+1.00% previously).  Anyone for a recession? 
 Nonetheless, over Q2, it is clear central banks in the developed economies have placed the
dampening down of inflation pressures front and centre of their primary objectives, even if it
comes at the cost of sluggish growth or, indeed, recession (mild ideally but it is very difficult to
micro-manage economic performance).  The Monetary Policy Committee (MPC) is in step with
this approach although, arguably, the UK economy is dragging its feet to a greater extent than
that seen in the US.   
 What are the key factors for consideration?  First, the CPI measure of inflation is already at
9.1%, and the Bank of England anticipates it will peak near to 11% just before Christmas. 
With the cost-of- living squeeze in full swing by that juncture, and unemployment likely to be
ticking upwards, we judge that the Bank will pause following its March 2023 meeting and judge
it has done enough so long as inflation starts to fall, albeit at a slow pace.  To that extent, we
can envisage the MPC waiting a full year before loosening the reins and starting to cut Bank
Rate in spring 2024. However, given the number of geopolitical factors that could push this
forecast off track, we would caution against taking a strong view on how interest rate

Page 96

movements evolve and instead focus on optimising balance sheet management and the risk
management of investment and debt portfolios. 
 Regarding gilt yields, all developed economies have seen a considerable uplift in government
bond yields across the whole curve since the start of 2022 and, in many ways, gilts have
simply played catch-up of late.  To that end, we have revised our PWLB forecasts upward and
you will even see we have a 3.7% PWLB rate projected for the 25-year part of the curve in
both 2022 and 2023.  However, as headline inflation falls back, we project a slow reduction in
gilt yields as investors acknowledge that price pressures are gradually coming under control. 
 At the 16th June MPC meeting, part of the reason for the Committee only seeing a 0.25% hike
as necessary is the prevailing weak economic data.  The vote was again 6-3 (the same as in
May) but the words were more hawkish with the Bank strengthening its forward guidance.  It
deleted the previous phrase that “some degree of further tightening…may still be appropriate”
and replaced it with “the scale, pace and timing of any further increases in Bank Rate will
reflect the Committee’s assessment of the economic outlook and inflationary pressures” and
that “the Committee will be particularly alert to indications of more persistent inflationary
pressures, and will, if necessary, act forcefully in response.” 
 Whereas in May two members objected to the guidance that rates will rise further, it appears
that all members are behind this new, stronger guidance.  However, the growing evidence that
firms’ price and wage expectations have become dislodged from the 2.0% target suggest that
the Bank is between a rock and a hard place in navigating the appropriate monetary policy
response.  As always, the economic data will be key to anticipating whether our assumptions
remain sound.

Page 97

Appendix 2 – Interest Rate Forecast 
The Council has appointed Link Group as its treasury advisors and part of their service is to
assist the Council to formulate a view on interest rates. The PWLB rate forecasts below are
based on the Certainty Rate (the standard rate minus 20 bps) which has been accessible to
most authorities since 1st November 2012. 
The latest forecast on 21st June is compared below to the previous forecast (10th May).  A
comparison of these forecasts shows that PWLB rates have increased generally and show
a speed up in the rate of increase in Bank Rate as inflation is now posing a greater risk.
The increase in PWLB rates reflects a broad sell-off in sovereign bonds internationally as
inflation concerns abound.  To that end, the MPC has tightened short-term interest rates
with a view to trying to slow the economy sufficiently to keep the secondary effects of
inflation – as measured by wage rises – under control, but without pushing the economy
into recession.  
Our current and previous PWLB rate forecasts below are based on the Certainty Rate (the
standard rate minus 20 bps) which has been accessible to most authorities since 1st
November 2012. 
 LIBOR and LIBID rates ceased for new contracts at the end of 2021. In a continuation
of our previous forecasts, our money market yield forecasts are based on expected
average earnings by local authorities for 3 to 12 months.
 Our forecasts for average earnings are averages i.e., rates offered by individual banks
may differ significantly from these averages, reflecting their different needs for
borrowing short-term cash at any one point in time. 
A SUMMARY OVERVIEW OF THE FUTURE PATH OF BANK RATE
 Our central forecast for interest rates was last updated on 21st June and reflected a
view that the MPC will be keen to further demonstrate its anti-inflation credentials by
delivering a 0.25% increase in Bank Rate in August, September, November,
December, February and March i.e., the next six MPC meetings.
Link Group Interest Rate View 21.06.22
Sep-22 Dec-22 Mar-23 Jun-23 Sep-23 Dec-23 Mar-24 Jun-24 Sep-24 Dec-24 Mar-25 Jun-25
BANK RATE 1.75 2.25 2.75 2.75 2.75 2.75 2.50 2.50 2.25 2.25 2.25 2.25
3 month ave earnings 2.00 2.50 2.80 2.80 2.80 2.80 2.60 2.50 2.30 2.30 2.20 2.20
6 month ave earnings 2.50 2.80 3.00 3.00 2.90 2.90 2.80 2.70 2.60 2.50 2.40 2.30
12 month ave earnings 3.10 3.20 3.20 3.20 3.00 2.90 2.80 2.60 2.50 2.40 2.40 2.40
5 yr   PWLB 3.20 3.30 3.30 3.30 3.30 3.20 3.10 3.00 3.00 3.00 2.90 2.90
10 yr PWLB 3.40 3.50 3.50 3.50 3.50 3.40 3.30 3.20 3.20 3.20 3.10 3.10
25 yr PWLB 3.70 3.70 3.70 3.70 3.70 3.70 3.60 3.50 3.50 3.40 3.40 3.30
50 yr PWLB 3.40 3.40 3.50 3.50 3.40 3.40 3.30 3.20 3.20 3.10 3.10 3.00
Link Group Interest Rate View 10.5.22
Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 Sep-23 Dec-23 Mar-24 Jun-24 Sep-24 Dec-24 Mar-25 Jun-25
BANK RATE 1.25 1.50 1.75 2.00 2.00 2.00 2.00 2.00 1.75 1.75 1.75 1.75 1.75
3 month ave earnings 1.20 1.50 1.70 2.00 2.00 2.00 2.00 2.00 1.70 1.70 1.70 1.70 1.70
6 month ave earnings 1.60 1.90 2.10 2.20 2.20 2.20 2.20 2.10 2.00 1.90 1.90 1.90 1.90
12 month ave earnings 2.00 2.20 2.30 2.40 2.40 2.30 2.30 2.20 2.20 2.10 2.10 2.10 2.10
5 yr   PWLB 2.50 2.50 2.60 2.60 2.60 2.60 2.60 2.60 2.50 2.50 2.50 2.50 2.50
10 yr PWLB 2.80 2.80 2.90 2.90 2.90 2.90 2.90 2.90 2.80 2.80 2.80 2.80 2.80
25 yr PWLB 3.00 3.10 3.10 3.20 3.20 3.20 3.10 3.10 3.00 3.00 3.00 3.00 3.00
50 yr PWLB 2.70 2.80 2.80 2.90 2.90 2.90 2.80 2.80 2.70 2.70 2.70 2.70 2.70

Page 98

 The CPI measure of inflation is now forecast to rise to close to 11% in Q4 2022 and the
MPC will be keen to stifle the prospect of average earnings data (6.8% y/y currently
including bonuses) providing further upside risk to inflationary factors that are primarily
being driven by supply-side shortages. 
 When Bank Rate reached 1% in May, the MPC indicated (no earlier than August) that it
will also consider the extent to which it implements Quantitative Tightening (QT),
primarily the selling of its gilt holdings. However, they are likely to take any such
decision cautiously as they are already not refinancing maturing debt.
 Notwithstanding the MPC’s clear desire to increase Bank Rate throughout 2022,
negative real earnings, the 54% hike in the Ofgem energy price cap from April (to be
followed by a potential 40%+ further increase from October), at the same time as
employees (and employers) have incurred a 1.25% Health & Social Care Levy, growing
commodity and food inflation plus council tax rises - all these factors will hit
households’ finances hard.  However, lower income families will be hit
disproportionately hard despite some limited assistance from the Chancellor to
postpone the full impact of rising energy costs.
 Given the above outlook, it poses a question as to whether the MPC may shift into
protecting economic growth if it flatlines or contracts through 2022.  Accordingly, we
remain tentative about whether the MPC will increase Bank Rate as far as the market
is currently pricing in (3.25% in April 2023).
 In the upcoming months, our forecasts will be guided not only by economic data
releases and clarifications from the MPC over its monetary policies, but the on-going
conflict between Russia and Ukraine, including the manner in which the West and
NATO respond through sanctions and/or military intervention.  Currently, oil, gas,
wheat and other mainstream commodities have risen significantly in price and central
banks will have to balance whether they prioritise economic growth or try to counter
supply-side shock induced inflation. 
 On the positive side, consumers are estimated to be sitting on over £160bn of excess
savings left over from the pandemic so that will cushion some of the impact of the
above increases.  However, most of those are held by more affluent people whereas
lower income families already spend nearly all their income before these increases hit
and have few financial reserves. 
PWLB RATES
 The yield curve has steepened considerably through the quarter and PWLB 5 to 50
years Certainty Rates are, generally, in the range of 2.75% to 3.75%.
 We view the markets as having built in, already, nearly all the effects on gilt yields of
the likely increases in Bank Rate and the poor inflation outlook (although we thought
that in May and markets went much further than expected in respect of the gilt market
sell-off).
 It is difficult to say currently what effect the Bank of England starting to sell gilts will
have on gilt yields now that Bank Rate has gone to above 1%.  Nothing will be decided
before August, however, but the Bank is likely to act cautiously as it has already started
on not refinancing maturing debt.  A pure roll-off of the peak £875bn gilt portfolio by not
refinancing bonds as they mature, would see holdings fall to about £415bn by 2031,
which would be about equal to the Bank’s pre-pandemic holding. 
 Increases in US treasury yields over the next few months could add further upside
pressure on gilt yields as they have done since the turn of the year.

Page 99

Appendix 3 – Prudential Indicators 
PRUDENTIAL INDICATOR 2022-23 2022-23 2023-24 2024-25
(1).  EXTRACT FROM BUDGET          
Forecast
Outturn
Original
Estimate
Forecast
Outturn
Forecast
Outturn
Capital Expenditure £'000 £'000 £'000 £'000    
Non - HRA 34,530 51,699 26,502 28,227    
TOTAL 34,530 51,699 26,502 28,227          
Ratio of financing costs to net revenue stream          
Non - HRA 2.70% 2.70% 4.56% 4.57%        
Net borrowing requirement          
brought forward 1 April * 309,092 292,303 333,145 348,569    
carried forward 31 March * 333,454 333,145 348,569 364,970    
in year borrowing requirement 24,362 40,842 15,424 16,401     
In year Capital Financing Requirement   
Non - HRA 24,362 40,842 15,424 16,401    
TOTAL 24,362 40,842 15,424 16,401     
Capital Financing Requirement as at 31 March   
Non - HRA 333,454 333,145 348,569 364,970    
TOTAL 333,454 333,145 348,569 364,970

Page 100

PRUDENTIAL INDICATOR 2022-23 2023-24 2024-25
(2).  TREASURY MANAGEMENT PRUDENTIAL
INDICATORS
£'M £'M £'M       
Authorised limit for external debt -     
borrowing 228 252 272    
other long term liabilities 120 121 116     
TOTAL 348 373 388     
Operational boundary for external debt -     
borrowing 223 247 267     
other long term liabilities 117 118 113     
TOTAL 340 365 380     
Upper limit for fixed interest rate exposure   
Principal re fixed rate borrowing  190% 190% 190%     
Upper limit for variable rate exposure   
Principal re variable rate borrowing  60% 60% 60%     
Upper limit for total principal sums invested for over 364
days
£20m £20m £20m     
(per maturity date)     
Maturity structure of new fixed rate borrowing during 2022/23
under 12 months       
12 months and within 24 months
24 months and within 5 years
5 years and within 10 years
10 years and above
upper limit lower limit
30% 0%
30% 0%
30% 0%
40% 0%
100% 0%

Page 101

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 11 AUGUST 2022
RESERVES AND BALANCES – UPDATE AS AT 30 JUNE 2022 
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to advise Members of the overall level of
reserves held by the Council as well as providing detail on the monitoring of the
earmarked balances held within the General Fund. 
1.2 The Council has a total of £364.558m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
1.3 At 31 March 2022 the Council had a total of £103.626m of usable reserves.  Of
this:
• £2.682m relates to the Repairs and Renewals Fund
• £4.414m relates to Capital Funds
• £96.530m was held in the General Fund, with £89.433m of this balance
earmarked for specific purposes.
1.4 Of the earmarked balance of £89.433m: 
• £46.923m is invested or committed for major initiatives/capital projects
• £37.089m is still to be drawn down in 2022-23
• £5.421m is planned to be spent in future years 
Appendix 1 provides further information on the unspent budget earmarkings and
Appendix 2 provides further information on the COVID earmarkings. 
1.5 The Council’s General Fund contingency level is set at 2% of net expenditure for
2022-23 which equates to £5.256m.  At the beginning of the financial year there
was £1.841m of unallocated General Fund Balance (over and above contingency). 
At the Council meeting on 24 February 2022 it was agreed that the budgeted
revenue surplus of £2.482m would be transferred into the general fund. After taking
this into consideration and the current forecast outturn for 2022-23, the Council is
estimated to have a £4.323m surplus over contingency.

Page 102

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 11 AUGUST 2022
RESERVES AND BALANCES - UPDATE AS AT 30 JUNE 2022 
2. INTRODUCTION 
2.1 This report outlines current balances on the Council’s reserves, both usable and
unusable. It also provides detail on the monitoring of the earmarked balances
within the General Fund.   
3. DETAIL 
3.1 Types of Reserves 
3.1.1 Usable Reserves - Councils have powers to establish certain resource backed
reserves which can be used to fund expenditure.  The powers of councils to
establish reserves are laid out in Schedule 3 of the Local Government
(Scotland) Act 1975.  These allow councils to establish a Renewal and Repairs
Fund, Insurance Fund and Capital Fund. Councils can also establish a Useable
Capital Receipts Reserve.  The Council must also maintain a General Fund and
can earmark balances for specific purposes within the General Fund. 
3.1.2 Unusable Reserves – Councils are also required to establish certain reserves
that are not backed by resources. They are required purely for accounting
purposes and do not represent resources available for councils to utilise. The
Pensions Reserve, Revaluation Reserve, Capital Adjustment Account, Financial
Instruments Adjustment Account and Accumulated Absences Account are
examples of unusable reserves. 
3.2 Reserve Balances at 31 March 2022 
3.2.1 The balances on each type of reserve at 31 March 2022 are set out in the two
tables below, per the Unaudited Accounts for 2021-22. 
Unusable Reserves £000
Revaluation Reserve 145,903
Capital Adjustment Account 223,147
Financial Instruments Adjustment Account (2,198)
Pensions Reserve 4,634
Accumulated Absences Account (6,928)
Total Unusable Reserves 364,558 
Usable Reserves £000
Repairs and Renewals Fund 2,682
Capital Fund and Usable Capital Receipts Reserve 4,414                                                                                                                
General Fund  96,530
Total Usable Reserves  103,626
Total Reserves  468,184

Page 103

3.2.2 The Revaluation Reserve represents the unrealised gains in the valuation of
fixed assets. The Capital Adjustment Account represents the difference
between depreciation based on proper accounting practice and statutory
charges for financing capital expenditure. The Financial Instruments Adjustment
Account represents the difference between gains and losses on borrowing and
statutory capital financing charges. The Pensions Reserve represents the
difference between pension costs based on proper accounting practice and
payments made for pension costs. The Accumulated Absences Account
represents the costed difference between holiday pay entitlement and actual
holidays taken at 31 March. 
3.2.3 The Repairs and Renewals Fund was established to support funding of renewal
and replacement of school equipment.  Schools can only draw on the Repairs
and Renewals Fund to the extent they have previously paid into the Fund and
contributions must be contained within schools devolved budgets. 
3.2.4 The Capital Fund was established to receive all capital receipts generated by
the Council and can be used to support the capital plan or meet the principal
repayments on loan charges. The Council decides as part of the budget
process each year how it wishes to draw funding from the Capital Fund. 
3.2.5 The Usable Capital Receipts Reserve relates to the accumulated unspent
capital receipts from sale of council houses prior to transfer of the housing
stock. The reserve forms part of the Council’s Strategic Housing Fund and can
only be used for investment in social housing. The reserve will be used in
accordance with the approach to investing in housing agreed by the Council in
August 2012. 
3.3 General Fund 
3.3.1 The General Fund balance at 31 March 2022 can be analysed as follows: 
Balance
31/03/22
£000
Balance on General Fund as at 31 March 2021 78,245
Increase to General Fund balance at end of 2021-22 18,285
Earmarked Balances (89,433)
Contingency allowance at 2% of net expenditure (5,256)
Unallocated balance as at 31 March 2022 1,841 
3.3.2 The General Fund includes balances that the Council has agreed to earmark for
specific purposes. Some of these earmarked balances will be spent during the
current financial year and some of them will be held over and spent in later
years. The table below shows the balance at 31 March 2022, the amounts that
are currently invested or set aside for major initiatives, the amount already
spent and planned to be spent in the current year, the amount to be spent in
future years and any sums no longer required to be earmarked. Appendix 1
provides further details on the breakdown of unspent budget earmarkings.

Page 104

Officers have reviewed and updated the spending profiles. Appendix 2 provides
further details on the breakdown of COVID reserves. 
3.4 Unallocated General Fund Balance 
3.4.1 The Council’s General Fund contingency is set at 2% of net expenditure for
2022-23 and amounts to £5.256m.  At the beginning of the financial year there
was £1.841m of unallocated General Fund Balance (over and above
contingency).   After taking into consideration the budgeted allocation to the
General Fund agreed by Council on 24 February 22 and the balanced forecast
Earmarking
Category
Balance
31/03/2022 -
per year
end
published
report
Transfers
between
categories
Invested or
committed
for major
initiatives
/capital
projects
Drawn-
down to
2022-23
Budget as
at 30/06/22
Still to be
drawn-
down in
2022-23
Planned
Spend
Future
Years
Balance no
Longer
Required
£000 £000 £000 £000 £000 £000 £000
Strategic Housing
Fund 6,590 6,590
Investment in
Affordable
Housing
3,300 3,300
Capital Projects 24,722 24,722
Lochgilphead and
Tarbert
Regeneration
2,271 2,271
Support for Rural
Growth Deal 1,058 1,058
Asset
Management
Investment
2,607 2,607
Piers and
Harbours
Investment Fund
1,643 1,643
Scottish
Government
Initiatives
3,141 2,774 367
CHORD 349 150 199
DMR Schools 1,982 1,982
Energy Efficiency
Fund 218 218
Existing Legal
Commitments 475 475
Unspent Grant 12,834 950 11,432 452
Unspent Third
Party Contribution 166 166
Previous Council
Decision - Other 4,343 -55 2,125 2,163
Redundancy
Provision 1,732 500 1,232
Supporting
Organisational
Change
1,588 500 1,088
Spend to Save
Route
Optimisation
100 100
Timing Delay 499 499
Hermitage Park 4 4
COVID-19 9,407 257 9,150
Unspent Budget 10,404 55 1,400 6,976 2,083
Totals 89,433 0 46,923 0 37,089 5,421 0

Page 105

outturn position at June, the Council is forecast to have a £4.323m surplus over
contingency. 
Heading Detail £000
Unallocated General Fund
as at 31 March 2022
This is the balance that is
unallocated over and above the 2%
contingency, which amounts to
£5.256m
1,841
Budgeted allocation to
General Fund for 2022-23
Budget
Per the Budget Motion at Council on
24 February 2022
2,482
Current Forecast Outturn
for 2022-23 as at 30 June
2022 
0
Estimated Unallocated
balance as at 31 March
2023 
4,323 
3.5 Loans Fund Review 
3.5.1 At the Council meeting on 27 February 2020, it was agreed that the one-off re-
profiling gain of £20.561m generated by the loans fund review should be used
partly to create a provision for the increasing principal repayments over the next
10 years (£7.649m) with the remainder of the gain (£12.912m) used to fund the
known liabilities/cost pressures. The table below shows what has been drawn
down against the one-off gain and the remaining balance. 
Agreed
Allocation
Transferred
to
Earmarked
Reserves / 
20-21 / 21-22
Budget
Transferred
to
Earmarked
Reserves /
22-23
Budget
Balance
Remaining 
£000 £000 £000 £000
Provision for the increasing
principal repayments 7,649   7,649
Provision to Support
Organisational Change 500 (500)  0
Estimated Cost of 2020-21
redundancies that are part of
budget savings proposals
600 (600)  0
Future Redundancies
Provision 1,500 (1,500)  0
Spend to Save Route
Optimisation 100 (100)  0
Funding Gap in Capital
Programme 2,619   2,619
Capital Programme
Intolerable Red Risks 574 (574)  0
Campbeltown Flood
Prevention Scheme 1,406   1,406
Significant Strategic Change
Projects  5,013 (2,856)  2,157
2020-21 Revenue Budget
Contribution  600 (600)  0 
20,561 (6,730)  13,831

Page 106

4. CONCLUSION 
4.1 The report outlines the overall reserves and balances for the Council covering
the purpose and level of each reserve.  It also provides detail as to expenditure
against earmarked balances held within the General Fund.   
4.2 As at 30 June 2022 the estimated unallocated General Fund, after taking into
consideration the budget motion and forecast outturn for 2022-23 is £4.323m.     
5. IMPLICATIONS 
5.1 Policy - Earmarked funds and funds set aside for delivery of
Single Outcome Agreement are available to support
Council Policy.
5.2 Financial -  Outlines the balances held with the Council’s usable
and unusable reserves.     
5.3 Legal -  None.
5.4 HR -  None.
5.5 Fairer Scotland Duty- None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty -  None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  A contingency of £5.256m (equivalent to 2% of net
expenditure) has been set aside as part of the
general fund.  This has been subject to a risk
assessment. 
5.8 Customer Service -  None. 
Kirsty Flanagan
Section 95 Officer 
8 July 2022 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
APPENDICES
Appendix 1 – Earmarked Reserves breakdown of unspent budget
Appendix 2 – Earmarked Reserves breakdown of COVID earmarkings 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 107

APPENDIX 1
Earmarked Reserves - Unspent Budget
As at 30 June 2022
Ref Department Service Description Opening Balance Budget
Drawdown
New earmarking
during 22-23
Remaining
Balance
Still to be drawn
down in 22-23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
001 Chief Executive's Unit Community Planning Communities and Partnership Team 8,855 8,855 8,855 0 The funds have originated from externally sourced income due to an employee being seconded to the
Scottish Community Development Centre (SCDC).  The funds will be used to support the team in
relation to meeting its priorities of Building Back Better (Communities), Climate Change and the review
of the Argyll and Bute Outcome Improvement Plan.
8,855 0 0
002 Chief Executive's Unit Community Planning Gaelic Development 8,235 8,235 8,235 0 To fund Gaelic specific work and project work of the Community Planning Partnership including the
development of the new 10 year Outcome Improvement Plan
8,235 0 0
003 Chief Executive's Unit Financial Services Financial Systems 114,000 114,000 114,000 0 To fund the completion of the implementation of the Oracle Fusion Financial Management System, a
software update for cash receipting to ensure card payments can still be taken and the procurement
and implementation of a new system to manage the requirements of the IFRS16 Leases accounting
standard.
114,000 0 0
004 Chief Executive's Unit Financial Services Accounting and Budgeting Team
Resilience
95,000 95,000 76,000 19,000 To fund the implementation of a new staffing structure in 2022/23 as agreed at ELT on 12 April 2022. 
This will provide funding to cover the additional staffing costs in 2022/23 and the training costs over
the period 2022/23 to 2026/27
76,000 5,000 14,000
005 Chief Executive's Unit Financial Services CIPFA 32,530 32,530 32,530 0 CIPFA Training - To fund the professional training costs for staff undertaking the CIPFA professional
accountancy qualification.
32,530 0 0
006 Chief Executive's Unit Financial Services Scottish Government Funding -
Welfare Reform/Discretionary
Housing Payments (agreed at
Council February 2014)
18,595 18,595 0 18,595 The Council was allocated additional funding of £550k from the Scottish Government late in 2013-14.
This money was allocated to support the Community Learning and Development Team to provide
courses to support Universal Credit claimants 2019/2020 to support the recruitment of casual tutors
and the purchase and upgrade of laptops. The monies were not utilised however it will now be
required to top up the Scottish Welfare Fund and DHP monies for 2022/23 as it is likely that given the
current cost of living crisis that more people will be in need of support through these funds
0 18,595 0
007 Executive Director (Douglas Hendry) Across Services / Education Digital Projects (Supply Staff
Booking System)
35,000 35,000 35,000 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063m and a general provision still to be allocated £0.189m
35,000 0 0
008 Executive Director (Douglas Hendry) Commercial Services Rothesay Pavilion Charity 750,000 750,000 375,000 375,000 Agreed at Council meeting February 2020, £750k additional revenue support subject to conditions
which seek to minimise the risk to the Council as far as is reasonably practicable including requirement
for adequate business and financial management and regular reporting by RPC.
375,000 375,000 0
009 Executive Director (Douglas Hendry) Commercial Services Demolition of former Lochgilphead
Primary and Rothesay Secondary
School
320,000 320,000 320,000 0 To fund the demolition of the former Lochgilphead Primary School and former Rothesay Academy
(subject to the removal of the listing).
320,000 0 0
010 Executive Director (Douglas Hendry) Commercial Services Rothesay Pavilion Essential repairs 306,400 306,400 306,400 0 Essential repairs to deal with potential health and safety risks and to avoid further deterioration. 
Budget provision was approved by the Policy and Resources Committee on 21 August 2014. 
306,400 0 0
011 Executive Director (Douglas Hendry) Commercial Services Estates - NDR Revaluation Appeals 84,688 84,688 84,688 0 The Council agreed to make provision to meet the cost of appealing Non Domestic Rates (NDR)
revaluations which will be imposed from 1st April 2017. It was agreed that £150,000 be earmarked
from the favourable 2016-17 outturn position to fund these appeals. The balance of £84,688  is still
required as NDR valuation appeals have been lodged but have not been heard yet. We will not know
the level of savings, and in turn the corresponding charge to us, until the appeals are concluded which
should be later on this year. Ryden are awaiting outcome of further citations which will incur fees.
84,688 0 0
012 Executive Director (Douglas Hendry) Commercial Services Site Investigation Works 21,013 21,013 21,013 0 For Site Investigation works in relation to Tweeddale Street Car Park, Oban and Oban Airport Business
Park to explore commercial opportunities to develop the sites and gain revenue income for Argyll and
Bute Council.  HUB North were instructed to procure contractors to undertake the site investigations
and work commenced in March 2020.   This is still ongoing.
21,013 0 0
013 Executive Director (Douglas Hendry) Commercial Services Catering and Cleaning Restructure
Costs
17,000 17,000 17,000 0 To support the catering and cleaning team restructure 17,000 0 0
014 Executive Director (Douglas Hendry) Education Education Transformation Fund 187,526 187,526 187,526 0 At the Council meeting on 27 February 2020, it was agreed to input £400k into Education Digital
Learning.  The additional funds have been spent in 20/21 and 21/22, as part of the ongoing
transformation work in the Education service, focussing on digital and virtual learning technology and
the development of learning clusters.  This will continue into 2022/23.
187,526 0
015 Executive Director (Douglas Hendry) Education Education Learning Estate Condition
Surveys
77,440 77,440 77,440 0 To fund the delivery of School Core Facts (SCF) compliant Condition Surveys for prioritised School
Buildings.
77,440 0 0
016 Executive Director (Douglas Hendry) Education Skype for Business for Education /
Digital Projects (Skype for Business)
10,000 10,000 10,000 0 To fund the initial capital costs for the implementation of Skype for Business for Education.  This will
bring the Education service in line with other council departments and will improve staff collaboration
and modernise school telephony to deliver the  service more efficiently and cost effectively.
A balance has been released back to the general fund because the rollout project is almost complete
with only £0.01m expected spend in 22/23.
10,000 0 0
017 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Education Purchasing Officers 210,000 210,000 90,000 120,000 The earmarked funds will be used to fund an education purchasing team within the Procurement
Service for two years.  The team will embed good procurement practice, train headteachers on current
procurement process requirements, develop spend plans that evidence best value.
90,000 120,000 0
018 Executive Director (Douglas Hendry) Legal and Regulatory
Services
NDR - One off contribution to 22/23
Budget
200,000 200,000 200,000 0 To fund one off operational saving CS04 agreed for the 2022/23 budget. 200,000 0 0
019 Executive Director (Douglas Hendry) Legal and Regulatory
Services
NPDO Schools Contract 166,000 166,000 166,000 0 To fund one off operational saving LRS01 agreed for the 2022/23 budget 166,000 0 0

Page 108

Ref Department Service Description Opening Balance Budget
Drawdown
New earmarking
during 22-23
Remaining
Balance
Still to be drawn
down in 22-23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
020 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Transformation Agenda QIO 100,259 100,259 70,259 30,000 Ongoing funding for the QIO post to lead the implementation of the service transformation
programme. The QIO will assist the Executive Director to deliver the Council’s transformation agenda
by developing, analysing and monitoring initiatives and projects which deliver the vision, values and
strategic objectives of the Council.
70,259 30,000 0
021 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Digital Projects: Hybrid Council
meetings
55,000 55,000 30,000 25,000 Per paper agreed at SMT October 2021 - allocation from Digital Projects (General Provision to be
allocated).  To fund the costs of livestreaming of Council meetings. 
30,000 25,000 0
022 Executive Director (Douglas Hendry) Legal and Regulatory
Support
Councillor IT Equipment 65,000 65,000 65,000 0 To meet the cost of provision of IT equipment for all new Elected Members as a result of the Local
Government Election in May 2022.
65,000 0 0
023 Executive Director (Douglas Hendry) Legal and Regulatory
Support
Debt Counselling & Welfare Rights 27,025 27,025 27,025 0 To meet the cost of a Debt Counselling and Welfare Rights Management System. 27,025 0 0
024 Executive Director (Douglas Hendry) Legal and Regulatory
Support
Community Safety Partnership 16,000 16,000 16,000 0 To earmark the Community Safety Partnership funding received for 2021/22 to be used for Community
Safety Partnership purposes.
16,000 0 0
025 Executive Director (Kirsty Flanagan) Customer Support Services Microsoft 365 300,000 300,000 166,930 133,070 To be added to existing earmarked reserves to meet increasing MS365 licensing costs from 2022/23
onwards
166,930 133,070 0
026 Executive Director (Kirsty Flanagan) Customer Support Services Growing our Own and Modern
Apprentices
109,150 109,150 109,150 0 Funding earmarked to support trainee development and modern apprenticeship opportunities based
on priority workforce risk areas. These areas have been identified and proposals developed. £95,790 to
be spent in 22/23 and £13,360 to be spent in 23/24 to fund a graduate trainee and 3 apprentices to
deliver trainee development and modern apprenticeship opportunities
109,150 0 0
027 Executive Director (Kirsty Flanagan) Customer Support Services Security Operations Centre
Subscription
76,455 76,455 0 76,455 There is a requirement to pay for a 3-year subscription at £60,000 per annum with a cost pressure
being added to the ICT revenue budget to cover the costs from year 4 onwards.  There is unallocated
funding of £103,545 from the earmarking created at 2020/21 year end for 'Digital Projects', so the
earmarking request for 2021/22 year end is the balance of £76,455
16,455 60,000
028 Executive Director (Kirsty Flanagan) Customer Support Services Learning and Development 36,508 36,508 36,508 0 In order to maximise the opportunities and efficiencies of digital learning, this funding will be used to
support the extension of digital learning in order to deliver the Digital Learning Strategy, which was
approved in FQ4 20/21.
36,508 0 0
029 Executive Director (Kirsty Flanagan) Customer Support Services Implementation of Gaelic Language
Plan
30,000 30,000 30,000 0 Agreed at Council Meeting February 2021.  Provision of funding for delivery and implementation of the
council’s Gaelic Language Plan in recognition of the contribution that Gaelic makes to economic growth
and to the tourism sector, and to enable delivery of key activities within the plan which currently
receive no revenue funding.
30,000 0 0
030 Executive Director (Kirsty Flanagan) Customer Support Services Establishing HR Service Centre 30,000 30,000 18,000 12,000 To facilitate the implementation of technical efficiency improvements and new processes 18,000 12,000 0
031 Executive Director (Kirsty Flanagan) Customer Support Services Business Development Training 27,601 27,601 27,601 0 This budget is funding ongoing leadership development, coaching, action learning sets and
commissioned training including Priority Management.
27,601 0 0
032 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Oban TIF (Tax Incremental
Financing)
709,700 709,700 709,700 0 Will be used to fund the TIF Programme office for a further 3 years as well as the programme office for
Rural Growth Deal beyond the funding that was agreed at Council for this in February 2021.
709,700 0 0
033 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Strategic Events & Festivals 115,764 115,764 115,764 0 At the Council meeting on 25 February 21, a decision was taken to agree £90k funding for Events and
Festivals for 22-23, in order that the application process can commence during 21-22 and that this
agreed figure be augmented by any underspend remaining from the 20-21 financial year.  At 24
February 22, decision made to agree £90k for 23-24, in order that the application process can
commence during 22-23 and that this agreed figure be augmented by any underspend remaining from
the 21-22 financial year
115,764 0
034 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Island Post 50,461 50,461 50,461 0 To fund a temporary post at LGE11 to assist with the National Islands Plan Implementation Route Map
2020-2025
50,461 0 0
035 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Royal National Mod 40,000 40,000 20,000 20,000 One off funding allocation for the Royal National Mod agreed as part of the budget setting process for
2019-20. Grant contract issued. Proposed payment of £20k per annum starting 2020/21  (2023/24 final
payment of £20k)
20,000 20,000 0
036 Executive Director (Kirsty Flanagan) Roads & Infrastructure Waste Variation Monies 1,492,997 1,492,997 746,499 746,498 This would be used to fund/part-fund various waste infrastructure projects that will support the
council’s compliance with the 2025 ban on the Landfill of Biodegradable Municipal Waste, including
the development of landfill cell construction works at Gartbreck.
746,499 746,498 0
037 Executive Director (Kirsty Flanagan) Roads & Infrastructure Climate Change 500,000 500,000 500,000 0 At the Council meeting on 27 February 20, it was agreed to input £500k budget to mitigate the impacts
of weather related damage and climate change with specific emphasis on gully cleaning and drainage
improvements  Spend has been delayed due to COVID and the intention is to spend the funds on 2
500,000 0
038 Executive Director (Kirsty Flanagan) Roads & Infrastructure 3G pitches / Tarbert Sports Pitches 427,286 427,286 89,373 337,913 In November 2018, the Council agreed to a maintenance funding package to be progressed for a
number of 3G pitches including Tarbert. This funding will provide an estimated 6.5 years’ worth of
ongoing maintenance up to 2025-26.
89,373 337,913 0
039 Executive Director (Kirsty Flanagan) Roads & Infrastructure Green Transport Initiatives 400,000 400,000 400,000 0 At the Council meeting on 27 February 20, it was agreed to input £400k in Green transport, investment
in footway and cycle path maintenance supporting the healthy wellbeing and green agenda.  Spend
has been delayed due to COVID and this will be taken forward in 21-22. £260k Footways
Reconstruction programme now agreed across the four areas, £140k Ardrishaig North Project.
400,000 0
040 Executive Director (Kirsty Flanagan) Roads & Infrastructure Waste Strategy 363,000 363,000 225,000 138,000 To fund/part-fund various waste infrastructure projects that will support the council's compliance with
the 2025 ban on the Landfill of Biodegradable Municipal Waste.
225,000 138,000 0
041 Executive Director (Kirsty Flanagan) Roads & Infrastructure Waste Management 256,753 256,753 256,753 0 Will be used towards long term waste management strategy/model, including but not limited to
scoping work for the creating of a waste transfer station .
256,753 0 0
042 Executive Director (Kirsty Flanagan) Roads & Infrastructure Replacement Signage and Bins 135,366 135,366 135,366 0 To replace street litter bins and key road signage.  This would help to reduce future budget pressures
for replacements of bins and signs and would also help to enhance the streetscape and general
appearance of the area by refreshing the street furniture
135,366 0 0
043 Executive Director (Kirsty Flanagan) Roads & Infrastructure Kintyre Recycling Redundancy Costs 36,000 36,000 36,000 0 To fund redundancy costs associated with Kintyre Recycling 36,000 0 0
044 Executive Director (Kirsty Flanagan) Roads & Infrastructure Amenity Services introduction of
management information system
28,099 28,099 28,099 0 Delay with introduction of amenity time recording system, spend unlikely to be incurred until 2022-23
for handheld devices and software.
28,099 0 0
045 Non Departmental Non Departmental Underwriting development of
Rothesay Pavilion
1,000,000 1,000,000 1,000,000 0 Funding to meet additional costs identified as necessary for the refurbishment of Rothesay Pavilion. 1,000,000 0 0
046 Non Departmental Non Departmental Loans Fund 385,279 385,279 385,279 0 At the Council Budget meeting on 24 February 2022, Saving FS01, a Loans Fund
Management/Operational saving for 22/23 budget of £0.500m was agreed with at least £0.200m to
come from underspends in 21/22.  The underspend position for 21/22 is £0.385m and this has to be
earmarked to help offset the saving. 
385,279 0 0
047 Non Departmental Non Departmental Utilities 283,000 283,000 283,000 0 To contribute towards the expected adverse impact on the 2022/23 budget of utility costs inflation as
per Budget Pack
283,000 0 0

Page 109

Ref Department Service Description Opening Balance Budget
Drawdown
New earmarking
during 22-23
Remaining
Balance
Still to be drawn
down in 22-23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
048 Non Departmental Non Departmental Digital Projects (General Provision to
be allocated)
103,545 103,545 103,545 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063mand a general provision still to be allocated £0.189m. 
Further allocation to Hybrid Council Meetings agreed October 2021 (£0.085m).
There is a proposal for 2021-22 year end to use the balance of this earmarking towards the Security
Operations Centre Subscription unspent budget request - per Appendix 2.1l
103,545 0 0
049 Non Departmental Non Departmental Community Resilience Fund 76,447 76,447 76,447 0 Fund established in 2012/13 to be spent over more than one year. Fund reduced at the Council
meeting on 11 February 2016
76,447 0 0
050 Non Departmental / Chief
Executive's Unit
Across Services / Chief
Executive's Unit
Information Management (Balance
of Funding)
209,844 209,844 209,844 0 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV Review. 
The planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k,
document management and workflow system for Planning, Building Standards and Environmental
Health £77k and a balance of funding to explore information management solutions in a strategic and
coherent way £209k
209,844 0 0
051 Non Departmental / Executive
Director (Douglas Hendry)
Across Services /
Commercial Services
Information Management (Estates
Survey Work)
12,697 12,697 12,697 0 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV Review. 
The planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k,
document management and workflow system for Planning, Building Standards and Environmental
Health £77k and a balance of funding to explore information management solutions in a strategic and
coherent way £209k
12,697 0 0
052 Non Departmental / Executive
Director (Douglas Hendry)
Across Services / Legal and
Regulatory Services
Information Management
(Digitalisation of Title Deeds)
92,000 92,000 61,000 31,000 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV Review. 
The planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k (delay on
spending due to COVID-19), document management and workflow system for Planning, Building
Standards and Environmental Health £77k and a balance of funding to explore information
management solutions in a strategic and coherent way £209k
61,000 31,000 0
053 Non Departmental / Executive
Director (Kirsty Flanagan)
Across Services / Customer
Support Services
Digital Projects (Digital Customer
Engagement Projects)
73,000 73,000 73,000 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063m and a general provision still to be allocated £0.189m
73,000 0 0
054 Non Departmental / Executive
Director (Kirsty Flanagan)
Across Services / Customer
Support Services
Digital Projects (Increase in Schools
Bandwidth)
63,455 63,455 63,455 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063m and a general provision still to be allocated £0.189m
63,455 0 0
055 Non Departmental / Executive
Director (Kirsty Flanagan)
Across Services / Customer
Support Services
Digital Projects (Replacement
Learning Management System)
11,470 11,470 11,470 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063m and a general provision still to be allocated £0.189m
11,470 0 0
056 Non Departmental / Executive
Director (Kirsty Flanagan)
Across Services /
Development and
Economic Growth
Information Management
(Document Management and
Workflow for Planning, Building
Standards and Environmental
Health)
57,491 57,491 57,491 0 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV Review. 
The planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k,
document management and workflow system for Planning, Building Standards and Environmental
Health £77k and a balance of funding to explore information management solutions in a strategic and
coherent way £209k
57,491 0 0
10,458,934 0 0 10,458,934 8,376,403 2,082,531 8,376,403 2,008,531 74,000

Page 110

APPENDIX 2
COVID Earmarkings
As at 30 June 2022
Ref Department Service Description Opening Balance Budget
Drawdown
Released back to
General Fund
New earmarking
during 22-23
Remaining
Balance
Still to be
drawndown in 22-
23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
001 Chief Executive's Unit Community Planning Community Planning - temp post to
support communities
55,000 55,000 55,000 0 As agreed at Policy & Resources committee on 9 December 2021, allocation of £0.055m to a post to
support the economic and social recovery together with the building back stronger themes.
55,000 0 0
002 Chief Executive's Unit Community Planning COVID-19 - Test and Protect Support 44,047 44,047 44,047 0 Funding provided in relation to the Local Self-Isolation Assistance Service.  The Community Planning
and Development Team will work with community groups to support their community response and
resiliency to Test and Protect and COVID-19 impacts
44,047 0 0
003 Chief Executive's Unit Financial Services LACER Fund 797,720 797,720 797,720 0 The Council meeting on 28 April 2022, it was agreed that Local Authority Covid Economic Recovery
(LACER) Funding is to be used to distribute Scotland Loves Local cards to CTR recipients. This will take
place in June 2022 giving Economic Development time to encourage the Co-op to sign up to accept the
cards.
797,720 0 0
004 Chief Executive's Unit Financial Services Housing Benefits Private 673,867 673,867 673,867 0 Specific funding allocation for DHP to support tenants financially affected by the COVID-19 outbreak to
sustain their tenancies.  It is expected there will continue to be pressure on this budget going into 22-
23
673,867 0 0
005 Chief Executive's Unit Financial Services Flexible Food Fund 510,573 510,573 510,573 0 Financial Insecurity funding from Scottish Government routed into the Argyll and Bute Flexible Food
Fund (ABFFF) is aimed at tackling financial insecurity for adults and families across Argyll and Bute. 
ABFFF offers financial support and wider confidential professional help to anyone suffering hardship.
Working in partnership with the Community Food Forum, Bute Advice Centre and ALIenergy,
households with low incomes and no access to cash savings can apply for immediate financial support. 
The Fund will help support daily living expenses.  If the claimant engages with these services, a second
payment will be made to contribute to a further months daily living expenses.  In the period from 10
January 2021 to 30 April 2022 client gain in extra benefits income for families was £1.45 million with
1,090 families had been supported. The project has been extended to 31 March 2023 and this money
will be used to support it.
510,573 0 0
006 Chief Executive's Unit Financial Services Flexible Funding for Supporting
People while at Tier 4 COVID
167,983 167,983 167,983 0 Funding to strengthen local authority responses to meet emerging needs and support people in their
communities struggling with the restrictions and guidance at all protection levels, particularly those at
risk through health and social inequalities; this support could cover the same types of support
currently delivered including information and advice, access to food and medicines, and practical and
emotional support; and, administration costs to support delivery (e.g. strengthening the National
Assistance Helpline) and liaison and co-ordination with 3rd sector. It will be for Local Government to
use this funding flexibly for this purpose. 
167,983 0 0
007 Chief Executive's Unit Financial Services Self Isolated Support Grant 16,000 16,000 16,000 0 Unspent admin funding for processing Self isolation Support Grants. Monies will be fully utilised in
2022/2023 to support the further administration of the grant until 31 March 2023.
16,000 0 0
008 Chief Executive's Unit Financial Services Test and Protect Extension 9,929 9,929 9,929 0 Funding provided in relation to the Local Self-Isolation Assistance Service.  This will be used to support
the recruitment of 0.5FTE LGE6 temp post to assist with call volumes in the Scottish Welfare Fund
team in 2022/23
9,929 0 0
009 Executive Director (Douglas Hendry) Education Logistics Funding - Safe Opening of
Schools
940,605 940,605 940,605 0 SG Funding to ensure the safe opening and operation of schools.  Includes transport, PPE, Cleaning and
expansion of estate.
940,605 0 0
010 Executive Director (Douglas Hendry) Education Additional Teaching/Support in
Schools/Digital Devices/Family
Home Learning Support Fund -
£45m Grant - £45m
488,310 488,310 488,310 0 Continuation of funding for additional staffing, teachers, support staff, additional devices for pupils
and additional family /home learning programmes.
488,310 0 0
011 Executive Director (Douglas Hendry) Education COVID 19 - Education Recovery -
Additional Staff in School and ELC
settings
373,346 373,346 373,346 0 To employ a variety of school staff to meet the needs of children and young people in their local areas
and ensure that levels of teaching and support staff in schools can be maintained in the 2021-22
academic year.  Funding will also be used to support the transition from ELC to primary school.
373,346 0 0
012 Executive Director (Douglas Hendry) Education Education to Support Young People 321,816 321,816 321,816 0 As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.600m.  Agrees
to fund a package of measures to boost the wellbeing and build back the resilience of young people, in
particular those most vulnerable, following the Covid-19 pandemic, including counselling and increased
provision of childcare for children under three. Notes that the Scottish Government is yet to confirm
details of funding for similar initiatives and, should our investment in children’s wellbeing qualify for
this funding, the balance will be re-allocated to the Recovery and Renewal Fund. 
321,816 0 0
013 Executive Director (Douglas Hendry) Education Recruitment of Additional Teachers
and Support Staff in Schools
136,715 136,715 136,715 0 Fund additional teachers and support staff. 136,715 0 0
014 Executive Director (Douglas Hendry) Education EDU - Community Mental Health
and Wellbeing Support to Children
and Young People - Pandemic
Funding
49,756 49,756 49,756 0 Scottish Government/COSLA Initiative to support the work under the Children and Young People's
Mental Health and Wellbeing Programme grant split in 2020-21 with £183,750 of the fund utilised by
local collaborative partnerships for supporting children, families and carers through the pandemic.  The
Scottish Government has agreed for the balance to be spent in 2022/23.
49,756 0 0
015 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Welfare Rights Support 172,000 172,000 172,000 0 As agreed at the Council Meeting on 25 February 2021 - an allocation of £0.172m.  As part of our focus
on Improving Opportunities for People and Communities, agrees to provide additional resources to
proactively support people experiencing poverty and hardship, by investing in two additional Welfare
Rights support staff for two years.
172,000 0 0
016 Executive Director (Douglas Hendry) Legal and Regulatory
Services
LACER Funding - Advice Services 130,000 130,000 130,000 0 Local Authority COVID Economic Recovery (LACER) Funding for Welfare Rights - ALI Energy, Bute
Advice, Citizens Advice
130,000 0 0
017 Executive Director (Kirsty Flanagan) Customer Support Services Self Isolated Support / Self Isolated
Support Grant (HR)
115,000 115,000 115,000 0 These were monies that were provided by Scotgov to fund additional overtime and resources for
Shielding/Caring for People and Test and Protect activities, however low infection rates and therefore
demand in A&B meant that this was not required in 2020/21 or 2021-22.
The 2021-22  funding of £43,000 will be be used for Recovery related activities including the
recruitment of a Temporary Additional Web Developer to implement the improvements identified by
customers in the Customer Engagement Consultation and to mainstream the Coronavirus page
content back in to Business as usual. Another portion will be used to fund the Digital Receptionist
solution as part of safe re-opening of offices. 
The 2021-22 funding of £72,000 will be used to fund consultancy and development of RPA (robotic
process automation) software which will build automation within HR workflows and processes. This
will improve efficiency and accuracy.
115,000 0 0
018 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Staycation and Marketing Argyll and
Bute
592,013 592,013 592,013 0 As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.800m.   This will
include provision of additional waste disposal facilities and other facilities that will be informed by the
Motorhome and Informal Camping Survey.
592,013 0 0

Page 111

Ref Department Service Description Opening Balance Budget
Drawdown
Released back to
General Fund
New earmarking
during 22-23
Remaining
Balance
Still to be
drawndown in 22-
23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
019 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Tackling Digital Exclusion Top-Up
Fund
250,000 250,000 250,000 0 As agreed at the Council Meeting on 25 February 2021.  Establishes the Tackling Digital Exclusion Top
Up Fund to support communities and in some cases individuals that are missing out on national
programmes due to logistics and economies of scale.  While vouchers are available from the UK and
Scottish Governments in some cases these do not cover the full cost of infrastructure builds.
250,000 0 0
020 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (Small Business
Development Grant)
200,000 200,000 200,000 0 Local Authority COVID Economic Recovery Fund grant.  This funding will provide funding of between
£500 and £5,000 to help existing micro and small businesses to improve their resilience or growth via
projects to implement green initiatives, implement digital development, implement marketing
improvements and improve efficiency/innovation.
200,000 0 0
021 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (Sector Support
Grant)
150,000 150,000 150,000 0 Local Authority COVID Economic Recovery Fund grant.  This will provide funding, either part of the
small  business development grant or standalone, to help micros and small business to implement
projects that contribute to the sector as well as benefitting the business, for example: Tourism and
hospitality, food and drink or retail.  With option to provide additional business support to hard hit
areas including Bute and Kintyre where unemployment remains higher than average - support via
specialist advice, locally tailored grants to meet local priorities and targeted marketing activity.
150,000 0 0
022 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (New Enterprise
Support Grant)
120,000 120,000 120,000 0 Local Authority COVID Economic Recovery Fund grant.  This funding would provide £3,000 grants to
help new businesses start up and establish.
120,000 0 0
023 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Staycation Investment per budget
pack February 22
100,000 100,000 100,000 0 As agreed at Council on 24 February 2022, Staycation investment £0.100m.  Augments the 2021/22
£0.5m staycation initiative with an additional investment of £100k, including support for community
groups and partners in the provision of facilities which can support increasing staycation visitor
numbers during the 2022/23 season.
100,000 0 0
024 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Economic Development - temp post
to support economic recovery
55,000 55,000 55,000 0 As agreed at Policy & Resources committee on 9 December 2021, allocation of £0.055m to a post to
support the economic and social recovery together with the building back stronger themes.
55,000 0 0
025 Executive Director (Kirsty Flanagan) Development and
Economic Growth
EH Covid Posts 41,145 41,145 41,145 0 Funding for 2 posts for 2 years and not recruited until late 20-21 41,145 0 0
026 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (Shop Local) 40,000 40,000 40,000 0 Local Authority COVID Economic Recovery Fund grant.  This funding would provide funding to continue
the Shop Local scheme into 2022-23 and 2023-14, buying additional cards and allow the cards to gather
momentum and support local businesses.
40,000 0 0
027 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Tenant Hardship Fund 30,000 30,000 30,000 0 Grant received from Scottish Government to support tenants suffering hardship due to COVID-19. 
Claims have been made and Housing are in the process of paying these out and all claims will be
settled during 2022-23.
30,000 0 0
028 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (Gypsy Travellers) 10,000 10,000 10,000 0 Local Authority COVID Economic Recovery Fund grant.  This funding would pay for MECOPP (Minority
Ethnic Carers of People Project) to engage with the Gypsy Travellers community on the important
subject of the cost of living increases, fuel poverty and the impact of factors such as their remote rural
locations and the facilities available to them for everyday living  have on their livelihoods
10,000 0 0
029 Non Departmental Across Departments COVID Cost Pressures Beyond
2021/22
370,000 370,000 370,000 0 As agreed at the Council Meeting on 25 February 2021 (£2.5m)  with the value reduced to £0.370m
based on more up to date projections at year end 2021-22.  Allocation of COVID funding to projected
22/23 Revenue Cost Pressures
370,000 0 0
030 Non Departmental Non Departmental Recovery and Renewal Fund 1,547,000 1,547,000 1,547,000 0 As agreed at Council on 24 February 2022, Recovery and Renewal Fund £1.547m.  This is provision for
future recovery, regeneration and renewal, as well as any future pressures which may arise following
the Covid-19 pandemic through a dedicated Recovery and Renewal Fund.  Proposals for use of this
fund to be brought forward by officers to the Policy and Resources Committee. To include in the first
instance options for maximising Argyll and Bute’s potential as a green, connected staycation
destination of choice, requesting that officers bring to the Environment, Development and
Infrastructure Committee a report on use of external funding sources and other opportunities for
improving the electric vehicle charging network.
1,547,000 0 0
031 Non Departmental Non Departmental Unallocated Admin Support Grant 411,285 411,285 411,285 0 Funding to support the delivery of the Business Grants to local businesses, partially used during 20/21
and 21/22 but a balance remains to be carried forward and used in future years
411,285 0 0
032 Non Departmental Non Departmental Capital pressure 257,000 257,000 257,000 0 Pressure identified on the 20-21 COSLA COVID costs spreadsheets - requires to be earmarked to be
drawn down when required against the Capital Plan
257,000 0 0
033 Non Departmental Non Departmental Levelling up Fund bids per P&R
February 22
150,000 150,000 150,000 0 As agreed at Policy & Resources committee on 17 February 2022, an allocation of  up to £0.150m to
support Levelling Up Fund bids
150,000 0 0
034 Non Departmental Non Departmental CHARTS per budget pack February
22
75,000 75,000 75,000 0 As agreed at Council on 24 February 2022, investment in CHARTS £0.075m.  To support the
organisation in delivering targeted support, in communities, to the culture, arts and heritage sector as
part of its plans to contribute to overall economic recovery.
75,000 0 0
035 Non Departmental Non Departmental CHARTS 7,000 7,000 7,000 0 As agreed at the Council Meeting on 25 February 2021.  Allocation of COVID funding to CHARTS
£0.067m, with the balance of £0.007m being carried to 2022/23.  The allocation is to ensure that Argyll
and Bute’s culture, heritage and arts sector can make a contribution to our overall recovery and
renewal.
7,000 0 0
9,408,110 0 0 0 9,408,110 9,408,110 0 9,408,110 0 0