Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
6 October 2022 
NOTICE OF MEETING 
A meeting of the POLICY AND RESOURCES COMMITTEE will be held ON A HYBRID BASIS
BY MICROSOFT TEAMS AND IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD on
THURSDAY, 13 OCTOBER 2022 at 10:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
3. MINUTES 
(a) Policy and Resources Committee held on 11 August 2022 (Pages 3 - 8)  
(b) Special Policy and Resources Committee held on 11 August 2022 (Pages 9 - 10)
* 4. FINANCIAL REPORTS MONITORING PACK - 31 AUGUST 2022 (Pages 11 - 128)  
Report by Section 95 Officer 
5. BUDGET OUTLOOK 2023-24 TO 2027-28 (Pages 129 - 148)  
Report by Section 95 Officer 
6. BUDGET APPROACH (Pages 149 - 154)  
Report by Section 95 Officer 
7. POLICY FOR EMPTY PROPERTY RELIEF IN NON-DOMESTIC RATES FROM 1
APRIL 2023 (Pages 155 - 158)  
Report by Head of Financial Services 
8. CONSERVATION AREA REGENERATION SCHEME (CARS) PROJECT - 104-110
ARGYLL STREET, DUNOON (Pages 159 - 164)  
Report by Executive Director with responsibility for Development and Economic
Growth
Public Document Pack

Page 2

9. PLACE BASED INVESTMENT AND CROWN ESTATE FUND 2022/23 (TO
FOLLOW) 
Report by Executive Director with responsibility for Development and Economic
Growth 
10. COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 - UPDATE -
EXPRESSIONS OF INTEREST / ASSET TRANSFER REQUESTS / REPORTING
REQUIREMENTS (Pages 165 - 174)  
Report by Executive Director with responsibility for Commercial Services 
11. TARBERT AND LOCHGILPHEAD REGENERATION FUND - PROJECTS UPDATE
(Pages 175 - 186)  
Recommendation from Mid Argyll, Kintyre and the Islands Area Committee held on 7
September 2022 
REPORTS FOR NOTING 
12. ARGYLL AND BUTE COUNCIL EMPLOYABILITY FINANCIAL AND SERVICE
PROVISION UPDATE (Pages 187 - 196)  
Report by Executive Director with responsibility for Development and Economic
Growth 
13. POLICY AND RESOURCES COMMITTEE WORKPLAN (Pages 197 - 200)
Items marked with an “asterisk” are items, on the basis of information available at the time this
Agenda is published, on which the Committee may not have delegated powers to act, and which
may therefore require to be referred to the Council or another Committee, and that referral may
depend on the decision reached at the meeting. 
Policy and Resources Committee 
Councillor Gordon Blair Councillor Robin Currie (Chair)
Councillor Audrey Forrest Councillor Kieron Green
Councillor Amanda Hampsey Councillor Fiona Howard
Councillor Willie Hume Councillor Andrew Kain
Councillor Reeni Kennedy-Boyle Councillor Jim Lynch
Councillor Liz McCabe Councillor Yvonne McNeilly
Councillor Ross Moreland Councillor Gary Mulvaney (Vice-Chair)
Councillor Dougie Philand   
Contact: Hazel MacInnes  Tel: 01546 604269

Page 3

MINUTES of MEETING of POLICY AND RESOURCES COMMITTEE held ON A HYBRID BASIS BY
ATTENDANCE IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD OR REMOTELY BY
MICROSOFT TEAMS 
on THURSDAY, 11 AUGUST 2022 
Present: Councillor Robin Currie (Chair) 
Councillor Gordon Blair
Councillor Kieron Green
Councillor Amanda Hampsey
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Reeni Kennedy-Boyle 
Councillor Jim Lynch
Councillor Liz McCabe
Councillor Yvonne McNeilly
Councillor Ross Moreland
Councillor Gary Mulvaney
Councillor Douglas Philand 
Attending: Pippa Milne, Chief Executive
Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director
Shona Barton, Committee Manager
Anne Blue, Interim Head of Financial Services
Jane Fowler, Head of Customer Support Services
Seona Laird, HR Service Centre Team Leader
Fergus Murray, Head of Development and Economic Growth
Ross McLaughlin, Head of Commercial Services 
Prior to the commencement of Business the Chair expressed his sadness at the sudden
passing of Councillor John McAlpine and made the following tribute to him – 
Today is the first formal committee meeting since we heard of the sudden and tragic
passing of our colleague and indeed our friend, John McAlpine. 
Our thoughts are first and foremost with his wife Karen and son Sam, and his wider family
and many friends who are mourning such a sad loss. 
John would have been sitting with us today as a member of this committee. Instead we
find ourselves paying tribute to him, remembering him, and regretting a life cut short far
too soon. 
We will remember John as one of the local members for Kintyre and the Islands, and for
his passion for his home of Tarbert, as a fine sportsman, as a lively character with a ready
smile and a twinkle in his eye. An Argyll man through and through. We will miss him very
much. Let us pause for a moment to remember John. 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillor Audrey Forrest. 
2. DECLARATIONS OF INTEREST 
Councillor Reeni Kennedy-Boyle advised that she had a relevant connection in relation to
item 8 of the Agenda (UK Shared Prosperity Fund – Argyll and Bute Investment Plan) by
Page 3 Agenda Item 3a

Page 4

virtue of her position as General Manager of Fyne Futures.  She advised that she would
leave the meeting during consideration of this item of business. 
3. MINUTES 
The Minutes of the meeting of the Policy and Resources Committee held on 16 June 2022
were approved as a correct record. 
4. FINANCIAL REPORTS MONITORING PACK - 30 JUNE 2022 
The Committee gave consideration to a report providing a summary of the financial
monitoring reports as at the end of June 2022.  There were five detailed reports, setting
out the position as at 30 June 2022. 
Decision 
The Policy and Resources Committee – 
1. Noted the revenue budget monitoring report as at 30 June 2022; 
2. Noted the financial risks for 2022-23; 
3. Noted the capital plan monitoring report as at 30 June 2022 and approved the
proposed changes to the capital plan as outlined in Appendix 4 of that report; 
4. Noted the treasury monitoring report as at 30 June 2022; 
5. Noted the reserves and balances report as at 30 June 2022; and 
6. Noted there were no revenue virements over £0.200m between April and June 2022. 
(Reference:  Report by Section 95 Officer dated 8 July 2022, submitted) 
5. BUDGET OUTLOOK 2023-24 TO 2027-28 
The Committee gave consideration to a report providing an update to the budget outlook
2023-24 to 2027-28 reported to the Policy and Resources Committee on 16 June 2022. 
Decision 
The Policy and Resources Committee noted the current estimated budget outlook position
for the period 2023-24 to 2027-28. 
(Reference:  Report by Section 95 Officer dated 20 July 2022, submitted) 
6. SERVICE ANNUAL PERFORMANCE REVIEWS 21/22 
The Committee gave consideration to a report presenting the Service Annual Performance
Review and Scorecard 2021/22 for Financial Services; Community Planning and
Development; Legal and Regulatory Support; Commercial Services; and Customer
Support Services. 
Decision
Page 4

Page 5

The Policy and Resources Committee approved the Service Annual Performance Reviews
and Scorecards 2021/22 as presented for publication on the Council’s website. 
(Reference:  Report by Executive Director with responsibility for Customer Support
Services dated 13 July 2022, submitted) 
7. AMENDMENT TO PENSIONS DISCRETIONS POLICY - SHARED COST AVCS 
The Committee gave consideration to a report proposing the inclusion of a new discretion
in the Council’s Local Government Pension Scheme (LGPS) Discretionary Pension Policy
Statement to permit Local Government Pension Scheme members to participate in a
Shared Cost Additional Voluntary Contributions (AVC) Scheme. 
Decision 
The Policy and Resources Committee approved the amendment to the Council’s Pensions
Discretion Policy to allow employees to access this financial benefit if they so choose. 
(Reference:  Report by Executive Director with responsibility for Customer Support
Services dated 19 July 2022, submitted) 
Councillor Reeni Kennedy Boyle, having declared an interest in the following item of
business, left the meeting and took no part in the consideration of this item. 
8. UK SHARED PROSPERITY FUND - ARGYLL AND BUTE INVESTMENT PLAN 
The Committee gave consideration to a report which sought approval of the Argyll and
Bute UK Shared Prosperity Fund (UKSPF) Investment Plan to deliver the Council’s
allocation of just under £4.5M to be delivered over 3 years. 
Decision 
The Policy and Resources Committee – 
1. Agreed the Argyll and Bute UK Shared Prosperity Fund (UKSPF) Investment Plan
appended to the submitted report at Appendix A for submission to the UK Government,
subject to addressing amendments/ comments from committee members; and  
2. Agreed that regular updates be provided to the Policy and Resources Committee on
the progress of the delivery of the Argyll and Bute UKSPF Investment Plan aligned to
the predefined outputs and outcomes. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 11 August 2022, submitted) 
Councillor Reeni Kennedy Boyle re-joined the meeting. 
9. PLACE BASED INVESTMENT AND CROWN ESTATE FUND 2022/23 –
REMAINING FUNDING ALLOCATIONS AND POSSIBLE PROJECTS 
The Committee gave consideration to a report which detailed the process for allocation of
the remaining Place Based Investment Funding for 2022/23 of £322,486, taking into
Page 5

Page 6

account the Place Based Investment Criteria as set out by the Scottish Government and
the associated timeline for spend.  The report also sought consideration of the unallocated
Crown Estate funding for 2022/23. 
Decision 
The Policy and Resources Committee agreed – 
1. That the Executive Director with responsibility for Development and Economic Growth
seeks suggestions for potential projects that would fit with the funds criteria and
timeline from all Elected Members; 
2. That delegated authority be given to the Executive Director with responsibility for
Development and Economic Growth, in consultation with the Leader and Depute
Leader of the Council, and Leader of the largest Opposition Group; to agree
expenditure on the projects that fit best for the 2022/23 allocation, following receipt of
any suggestions; and 
3. That arrangements are put in place which would facilitate Area Committees and / or
Area Community Planning Groups being involved in the discussions around the
2023/24 allocation of Place Based Investment funding prior to it coming before
Members for decision. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 21 July 2022, submitted) 
10. CLIMATE CHANGE UPDATE 
(a) Council Carbon Emissions & Climate Investment 2022 
The Committee gave consideration to a report highlighting the Council’s overall
annual carbon emissions for the most recent period 2020/21 and outlining that
changes to the process would be forthcoming in future months due to change in The
Climate Change (Duties of Public Bodies: Reporting Requirements) (Scotland)
Amendment Order 2020.  The report also invited the Policy Lead with the
responsibility for Climate Change to be a member of the Climate Change Board to
ensure a seamless link with regards to strategic leadership and operational delivery. 
Decision 
The Policy and Resources Committee – 
1. Noted the publication of the Council’s 2020/21 carbon emissions report and its
continued positive trend highlighting that carbon dioxide equivalent emissions
have reduced by 33% in past 6 years; 
2. Noted the climate change projects that would be developed in 2022 onwards that
are aligned to the additional £500,000 commitment that was allocated at the
February 2022 Council Budget; and   
3. Agreed to the inclusion of the Policy Lead with responsibility for Climate Change
as a member of the Climate Change Board. 
Page 6

Page 7

(Reference:  Report by Executive Director with responsibility for Commercial
Services dated 14 July 2022, submitted) 
(b) Decarbonisation Plan - Action Tracker & Case Studies 
The Committee gave consideration to a report presenting the updated De-
carbonisation Plan Action Tracker and supplementary case studies providing
additional information on positive climate change work the Council was undertaking. 
Decision 
The Policy and Resources Committee noted – 
1. The progress of specific actions from the Decarbonisation Action Plan; and 
2. The supplementary case studies that provide information on positive climate
change projects being undertaken by different departments of the Council. 
(Reference:  Report by Executive Director with responsibility for Commercial
Services dated 11 August 2022, submitted) 
11. COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 - UPDATE -
EXPRESSIONS OF INTEREST / ASSET TRANSFER REQUESTS / REPORTING
REQUIREMENTS 
A report advising on the operation of the processes in regard to formal Asset Transfer
Requests (ATR) and Participation Requests in terms of the Community Empowerment
(Scotland) Act 2015; current live informal Expressions of Interest (EOI’s) which may
become subject to a formal asset transfer request or be dealt with outwith the formal asset
transfer request process; current live ongoing or agreed Participation Requests received
by the Council; and the annual reporting requirements in respect of Asset Transfer
Requests and Participation Requests set out in Section 95 and 32 of the Community
Empowerment (Scotland) Act 2015 respectively; was before the Committee for noting. 
Decision 
The Policy and Resources Committee noted the content of the submitted report and
agreed that this would be listed as a substantive item at the next meeting of the
Committee for discussion by all Members. 
(Reference:  Report by Executive Director with responsibility for Commercial Services
dated 27 June 2022, submitted) 
12. POLICY AND RESOURCES WORKPLAN 
The Policy and Resources Committee Workplan was before the Committee for noting. 
Decision 
The Policy and Resources Committee noted the content of the submitted workplan. 
Page 7

Page 8

(Reference: Policy and Resources Committee Workplan dated 11 August 2022,
submitted) 
Page 8

Page 9

MINUTES of SPECIAL MEETING of POLICY AND RESOURCES COMMITTEE held ON A HYBRID BASIS
BY ATTENDANCE IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD OR REMOTELY BY
MICROSOFT TEAMS 
on THURSDAY, 11 AUGUST 2022 
Present: Councillor Robin Currie (Chair) 
Councillor Gordon Blair
Councillor Kieron Green
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Reeni Kennedy-Boyle
Councillor Jim Lynch 
Councillor Liz McCabe
Councillor Yvonne McNeilly
Councillor Ross Moreland
Councillor Gary Mulvaney
Councillor Douglas Philand 
Attending: Pippa Milne, Chief Executive
Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director
Shona Barton, Committee Manager 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillor Audrey Forrest. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. FINAL PROPOSED AMENDED SCHEME FOR THE ESTABLISHMENT OF COMMUNITY
COUNCILS IN ARGYLL AND BUTE - 2022/26 
The Committee gave consideration to a report providing feedback following a recent 8
week public consultation to amend the current Scheme for the Establishment of
Community Council’s in Argyll and Bute (“the Scheme”) and inviting the Committee to
approve the Scheme attached at Appendix 4 to the report, as amended over the course of
the two stage public consultation in line with Appendices 1, 2 and 3 to the submitted
report. 
Decision 
The Policy and Resources Committee agreed to – 
1. Approve the final proposed amended Scheme for the Establishment of Community
Councils in Argyll and Bute for the term 2022/26; the amended Best Practice Guidance
2022/26; the boundaries for the community councils for term 2022/26; and the
administration grant levels for 2022/26 (as set out in Appendices 4-7); 
2. Instruct officers to give the requisite 4 week period of notice of the newly amended
Scheme; 
3. Delegate consideration of any feedback received during the 4 week period to the
Executive Director with responsibility for Legal and Regulatory Support, in consultation
with the Depute Policy Lead - Community Planning and Corporate Services; and   
Page 9 Agenda Item 3b

Page 10

1. Note that subject to there being no material changes proposed from the feedback
received, the newly amended Scheme would come into effect as of 20 October 2022 to
coincide with community council elections taking place on that date. 
(Reference:  Report by Executive Director with responsibility for Community Council
Governance dated 18 July 2022, submitted) 
Page 10

Page 11

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 13 OCTOBER 2022
FINANCIAL REPORTS MONITORING PACK – 31 AUGUST 2022  
1. INTRODUCTION 
1.1 This report provides a summary of the financial monitoring reports as at the end of
August 2022. There are five detailed reports, setting out the position as at 31 August
2022,  which are summarised in this Executive Summary: 
• Revenue Budget Monitoring Report 
• Monitoring of Financial Risks 
• Capital Plan Monitoring Report 
• Treasury Monitoring Report 
• Reserves and Balances 
2. DETAIL 
2.1 Revenue Budget Monitoring Report 
2.1.1 This report provides a summary of the current revenue budget monitoring position to
ensure net expenditure is contained within budget.  It provides corporate and
departmental information with comparisons on a forecast outturn and a year to date
basis. 
2.1.2  There is a forecast overspend of £0.117m as at the end of August 2022.  This
projection results from the elected members pay award (£0.026m), an under-
recovery of income within parks and pest control (£0.070m) and high demand for
services within Social Work (£0.021m).  Note the elected members pay award is set
nationally via Statutory Instrument and the forecast overspend is due to a 5.2%
increase which is above the 2% previously built into the budget.   
2.1.3  The forecast overspend does not include the potential impact of the 2022-23 pay
settlement, where negotiations are at an advanced stage.  The Scottish Government
has agreed to provide an additional £140m of recurring resource from 2022-23 to
support the current proposal of a 5% pay award which includes a £3,000 cap for
those earning above £60,000 based on a 37 hour week.  In addition, the Scottish
Government have agreed to provide a further £120.6m of capital funding in 2022-23
and 2023-24 which will be baselined as General Revenue Grant from 2024-25
onwards to ensure that everyone receives an increase of at least £1,925 or £2,000
(depending on spinal column point).  There remains a budget pressure that both the
Council and the HSCP will require to fund.   As is normal practice, the Health and
Social Care Partnership need to absorb any cost pressure in the same way that the
Council do and we await the detail on the additional funding as to whether any has to
be passported through to the Health and Social Care Partnership and will look to
have a conversation with both the Chief Officer and the Chief Financial Officer of the
IJB in respect of this.  Depending on the treatment of the funding, the gap for the
Page 11 Agenda Item 4

Page 12

Council could be in the region of £1.2m to £2.1m with a gap for the HSCP in the
region of £0.5m to £1.4m 
2.1.4 There is a year to date underspend of £2.970m.  More focus is on the forecast
outturn position, hence why sometimes the year to date position is not updated.  The
year to date variances mainly relate to the timing of income and expenditure and
recharging of costs to capital. 
2.1.5 With regard to the ongoing financial impact of COVID-19, there are £9.407m of
reserves committed to manage the impact of the pandemic. The detail behind these
commitments is contained within Appendix 2 of the Reserves and Balances report. 
2.1.6 Total policy savings relevant to 2022-23 financial year amount to £1.560m.  The
table below outlines their progress as at 31 August 2022.   
Category No. of
Options
2022-23
£000
2022-
23
FTE
2023-24
£000
2023-
24
FTE
Future
Years
£000
Future
Years
FTE
Delivered 5 235.0 1.4 243.0 1.4 243.0 1.4
On Track to be Delivered 12 603.5 0.5 606.5 0.5 609.5 0.5
Still to be Implemented 2 294.7 0.0 414.3 0.0 414.3 0.0
Being Developed 0 0.0 0.0 0.0 0.0 0.0 0.0
Potential Shortfall 4 402.5 0.0 402.5 0.0 402.5 0.0
Delayed 1 24.0 0.0 24.0 0.0 24.0 0.0
TOTAL 24 1,559.7 1.9 1,690.3 1.9 1,693.3 1.9 
2.1.7 For those savings approved prior to February 2022, there are four savings
categorised as having a shortfall and one currently delayed.   
Health and Social Care Partnership (HSCP) – Financial Update 
2.1.8 The forecast outturn position at the end of August is an estimated overspend of
£0.521m for 2022-23 (£0.021m for Social Work and £0.500m for Health).  The Chief
Financial Officer of the IJB is confident that the spend will be brought in line with
budget by the end of the financial year. 
2.2 Monitoring of Financial Risks 
2.2.1  This report outlines the process and approach developed in carrying out a financial
risks analysis and provides an update on the current assessment of financial risks.   
2.2.2 There are 5 Council wide revenue risks identified for 2022-23 currently amounting to
£2.058m.   
Page 12

Page 13

2.2.3 There are currently 42 departmental risks totalling £5.745m.  Of the 42 departmental
risks, one is categorised as almost certain and 7 are categorised as likely.  These
will continue to be monitored and action taken to mitigate or manage these risks.   
2.2.4 The top three risks in terms of the financial impact are noted in the table below. 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance -
Bridges, Culverts
& Sea Defences
Extreme localised weather may
result in loss of bridge, culvert ,
road or sea defence
3 750
Roads and
Infrastructure
Services
Residual Waste
H&L and Tiree
There is a potential increase to
tipping fees and haulage costs for
H&L residual waste.  The Council’s
supplier Barr Environmental
(contract to end of 2023) lost a
tribunal relating to the
underpayment of landfill tax, which
may have led to the Council having
to source alternatives at a higher
cost.    Barr appealed the decision
which was heard in the Spring and
they won the case which should
have reduced or eliminated this
financial risk.  However, the
Scottish Government laid an
Amendment Order on Friday 1 July
2022 which came into force at 1700
on 1 July which indicates that
Landfill tax will be due on materials
previously not chargeable and we
have now received notification of
an increase in the cost which
officers are currently assessing.
4 655
Financial
Services
Council Tax Debt
Collection
Recovery
Recovery of debt becomes more
difficult to pursue in the current
economic climate.  This is in
relation to historical debt that has
accumulated over many years
therefore any adverse collection
rates will impact on the year end
debt provision as opposed to the in-
year financial position, hence no
forecast variance has been reported
within the current year.  
5 500 
Page 13

Page 14

2.2.5 There have been three changes to the departmental risks since the report as
presented to the Policy and Resources Committee on 11 August 2022.  These are
outlined in paragraph 3.4.1 of the Financial Risks Report. 
2.3 Capital Plan Monitoring Report 
2.3.1 This report provides a summary of the current capital plan monitoring position. 
Information is provided in terms of monitoring year to date budget, current full year
budget, future years total budget and funding and non-financial in terms of project
performance. 
2.3.2 
2.3.3
At the budget setting meeting on 25 February 2021, the Council agreed to provide a
£2.5m provision for the increase in capital contract costs as a result of COVID-19
and following agreement at the Policy and Resources Committee on 14 October
2021, this, plus a further £0.146m, was added to the capital programme. At the
budget meeting in February 2022 an additional £3.9m was set aside for further
capital contract increases including up to £1.2m for Campbeltown Flood Scheme. 
There are likely to be further financial pressures facing the capital programme that
are not able to be quantified at this stage largely relating to inflationary increases in
the construction industry and supply chain issues. 
2.3.4 Actual net expenditure to date is £10.954m compared to a budget for the year to
date of £10.857m giving rise to an overspend for the year to date of £0.097m (0.9%).
The variance results from an accumulation of non-material variances across
projects.  
2.3.5 The forecast outturn for 2022-23 is a forecast net expenditure of £48.264m
compared to an annual budget of £48.260m giving rise to a forecast overspend for
the year of £0.004m (0.01%). 
2.3.6 The forecast total net projects costs on the capital plan are £178.745m compared to
a total budget for all projects of £178.526m giving rise to a forecast overspend for
the overall capital plan of £0.219m (0.12%).  
2.3.7 In respect of total project performance, there are 160 projects within the capital plan,
148 are complete or on target, 11 are off target and recoverable and 1 project is off
track.  
2.4 Treasury Monitoring Report 
2.4.1 This report provides information on the current levels and recent transactions in
relation to the capital financing limit, total borrowing, temporary borrowing and long
term borrowing and investments.   
2.4.2 The net movement in external borrowing for the period 1 July 2022 to 31 August
2022 was a decrease of £3.496. 
Page 14

Page 15

2.4.3 Borrowing is below the Capital Financing Requirement for the period to 31 August
2022.  At this stage in the financial year capital expenditure continues to be below
target. Due to delays as a result of the COVID-19 pandemic, capital expenditure has
been relatively low over the last twelve months. 
2.4.4 The levels of investments were £117.4m at 31 August 2022. The average rate of
return achieved was 1.802% which compares favourably with the SONIA (Sterling
Overnight Index Average) for the same period of 1.641%. 
2.5 Reserves and Balances 
2.5.1 This report summarises the overall level of reserves and balances and monitors the
spending of the earmarked reserves, providing detailed information on the unspent
budget earmarked balances.   
2.5.2 The Council has a total of £364.558m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
2.5.3 At 31 March 2022, the Council had a total of £103.626m of usable reserves.  Of this: 
• £2.682m relates to the Repairs and Renewals Fund
• £4.414m relates to Capital Funds
• £96.530m was held in the General Fund, with £89.433m of this balance
earmarked for specific purposes. 
2.5.4  Of the earmarked balance of £89.433m: 
• £46.510m is invested or committed for major initiatives/capital projects
• £4.094m has already been drawn down
• £32.402m is still to be drawn down in 2022-23
• £6.427m is planned to be spent in future years 
2.5.5 The table below summarises the estimated Unallocated General Fund Balance as at
the end of the financial year: 
Heading Detail £000
Unallocated General Fund
as at 31 March 2022
This is the balance that is unallocated
over and above the 2% contingency,
which amounts to £5.256m
1,841
Budgeted allocation to
General Fund for 2022-23
Budget
Per the Budget Motion at Council on 24
February 22
2,482
Current Forecast Outturn
for 2022-23 as at 31
August 2022 
(157)
Page 15

Page 16

Estimated Unallocated
balance as at 31 March
2023 
4,166 
2.5.6  It can be seen that, after taking into consideration the Budget Motion and the current
forecast outturn for 2022-23, the Council is forecast to have a £4.166m surplus over
contingency.  The balance does not take into account the 2022-23 pay award
currently in the final stages of negotiation. 
2.6 VIREMENTS OVER £0.200m (Revenue) 
2.6.1 Virement is the process of transferring budget between cost centres, services or
departments or between capital projects.  The Council’s constitution notes that
virements over £0.200m require approval by Council.  This section of the report will
be used to outline revenue virements in the period that require approval.   Capital
virements are included within the capital monitoring report. 
2.6.2 For the periods July and August 2022, there are 5 virements requiring authorisation:
- £0.308m harvested within Executive Director Kirsty Flanagan against the
vacancy savings target for the period April to July
- £0.383m harvested within Social Work against the vacancy savings target for
the period April to July
- £0.204m between Head of Education and Head of Commercial Services in
relation to NPDO charges 
- £0.250m between Roads and Infrastructure and Other Operating Income and
Expenditure in relation to a miscoding on saving RI01
- £0.328m harvested within Social Work against the vacancy savings target for
August 
3.  RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee: 
a) Consider the revenue budget monitoring report as at 31 August 2022 
b) Note the financial risks for 2022-23 
c) Note the capital plan monitoring report as at 31 August 2022 and approve the
proposed changes to the capital plan outlined in Appendix 4 of that report. 
d) Note the treasury monitoring report as at 31 August 2022 
e) Consider the reserves and balances report as at 31 August 2022  
f) Recommend to Council that the revenue virements over £0.200m during July and
August 2022 are approved 
Page 16

Page 17

4. IMPLICATIONS 
4.1 Policy – None.
4.2 Financial -  Outlines the revenue and capital monitoring for
2022-23 as at 31 August 2022
4.3 Legal -  None.
4.4 HR -  None.
4.5 Fairer Scotland Duty -   None.
4.5.1 Equalities – protected
characteristics - 
None.
4.5.2 Socio-economic Duty -  None.
4.5.3 Islands -  None.
4.6 Climate Change - None.
4.7 Risk -  Risks are included in financial risks report. 
4.8 Customer Service -  None. 
Kirsty Flanagan
Section 95 Officer
9 September 2022 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk 
Page 17

Page 18

REVENUE BUDGET MONITORING REPORT AS AT 31 AUGUST 2022 POLICY AND RESOURCES COMMITTEE
13 OCTOBER 2022 
2022-23 Overall Position:
There is an overall forecast overspend of £0.117m as at the end of August 2022.  Within Executive Director Kirsty Flanagan, there is a
forecast overspend of £0.070m from a projected under-recovery of income within Parks and Pest Control.  Within Central Budgets, there is a
£0.026m overspend resulting from the Elected Members pay award being greater than the available budget and Social Work is projecting a
£0.021m overspend due to a high demand for services.       
There is a year to date underspend of £2.970m.  The year to date variances within the departments tend to relate to the timing of income and
expenditure, the recharging of costs to capital and the over-recovery of vacancy savings. 
Key Highlights as at August 2022:
• The Oracle Fusion system hypercare stage of implementation is complete and training has been rolled out to wider services.
• The negotiations relating to the 2022-23 pay award are at an advanced stage with the current offer out to ballot.   
Key Financial Successes:
Performance against budget for 2021-22 was an overall net favourable position of £1.630m underspend after adjusting for year-end
earmarking.  This breaks down as: 
• £0.815m net underspend in relation to Council service departmental expenditure
• £0.432m net overspend in relation to other central costs
• £1.247m over-recovery of Council Tax income.   
Key Financial Challenges: Proposed Actions to address Financial Challenges:
Ongoing consideration of the financial impact of COVID on the Council’s
revenue position. 
Continue to identify additional costs as a consequence of COVID to
ensure earmarked COVID funds are applied appropriately. 
Achieving a favourable year-end position and achieving savings targets
in light of council wide risks to expenditure. 
Robust monitoring of the financial position and delivery of savings to
ensure budget issues inform the budget monitoring process.
Monitoring Social Work expenditure and more widely the IJB position as
any overspend will transfer back to partner bodies in the first instance.  
Continue to work closely with the CFO of the IJB to ensure that early
indication of any potential adverse financial outturn is known and
corrective action is agreed as appropriate to reduce the risk to the
Council. 
Identifying further savings and delivering services more efficiently with
less resources, as whilst a balanced 2022-23 budget was agreed in
February 2022 there are still budget gaps in future years.
The Council will continue to progress savings options identified in
2021-22 that require further development and seek to identify further
savings through themed reviews and business process reviews.
Page 18

Page 19

Maintaining or improving the level of service income recovered, for
example planning, building standards and car parking.  
Actively monitor income recovery and ensure Council fees and
charges policies are regularly reviewed. 
Managing spend in service areas which are demand led and, to some
extent, outwith service control, for example Winter Maintenance. 
Use risk based approach to budget monitoring to focus additional
attention on these areas.
Ongoing requirement to fund unavoidable inflationary increases in areas
like utility costs, fuel, food etc. This is impacted further by the availability
of supply as a result of the COVID-19 pandemic, UK exit from the
European Union, Russia’s invasion of Ukraine and sanctions on Russian
owned entities to name a few influencing factors.
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be reported through the budget monitoring
and preparation processes. 
Cost of living crisis impacting on pay inflation negotiations which could
result in pay awards above what is deemed affordable.
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be reported through the budget monitoring
and preparation processes. 
Forecast Outturn Position
There is a forecast overspend of £0.157m for 2022-23 as at the end of August 2022
Department
Annual
Budget   
£'000
Forecast
Outturn   
£'000
Current
Forecast
Variance
£'000
Previous
Forecast
Variance
£000
Change
£000 Explanation
Chief Executive's Unit 6,353 6,353 0 0 0 Department forecasting in line with budget
Executive Director (Douglas Hendry) 125,532 125,532 0 0 0 Department forecasting in line with budget
Executive Director (Kirsty Flanagan) 44,942 45,012 (70) 0 (70)Overspend due to under recovery of income in Parks and Pest Control
Social Work 72,911 72,932 (21) (75) 54 Overspend is mainly due to high demand for services
Central Budgets 23,867 23,893 (26) 0 (26)Overspend due to Elected Members pay award being higher than available budget
Financed By (273,605) (273,605) 0 0 0
Total 0 117 (117) (75) (42)
Current Forecast Outturn Variance with change from previous month Page 19

Page 20

(80)
(70)
(60)
(50)
(40)
(30)
(20)
(10)
0
10
20
30
40
50
60
70
80
April
May
June
July
August
September
October
November
December
January
February
£ 000
Movement in the forecast outturn position for each Department from the start of the
financial year
Chief Executive's Unit
Executive Director (Kirsty Flanagan)
Executive Director (Douglas Hendry)
Social Work
Underspend
Overspend
Further information on the departmental forecast variances is included later on in the report. 
Page 20

Page 21

Year to Date Position
The year to date position as at the end of August 2022 is an underspend of £2.970m and the main variances are noted below. 
Department
YTD
Actual
£'000
YTD
Budget
£'000
YTD
Variance   
£'000
Explanation
Chief Executive's Unit 3,571 3,316 (255) The YTD overspend can be attributed to profiling issues.
Executive Director (Douglas Hendry) 45,067 45,686 619 The YTD underspend can be attributed to underspends in employee budgets within
schools and learning centres
Executive Director (Kirsty Flanagan) 17,541 16,326 (1,215) The YTD overspend can be attributed to expenditure in Roads on capital works not
recharged yet.
Social Work 14,929 15,118 189 The YTD underspend can be attributed to over-recovery of vacancy savings.
Central Budgets 2,960 6,592 3,632 The YTD underspend can be attributed to profiling issues.
Funding (113,128) (113,128) 0
Total Net Expenditure (29,060) (26,090) 2,970 
Page 21

Page 22

0%
25%
50%
75%
100%
Chief
Executive's
Unit
Executive
Director
(Kirsty
Flanagan)
Executive
Director
(Douglas
Hendry)
Social W
ork
Central
Budgets
TOTAL
Expenditure to date against the remaining budget for each
Department
YTD Actual Remaining Budget
Further information on the departmental year to date variances is included later on in the report.  Page 22

Page 23

OBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 31 AUGUST 2022
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual Budget Forecast
Outturn
Forecast
Variance
Variance
£'000 £'000 £'000 % £'000 £'000 £'000 %
Departmental Budgets
Chief Executive's Unit 3,571 3,316 (255) (7.7%) 6,353 6,353 0 0.0%
Executive Director (Kirsty Flanagan) 17,541 16,326 (1,215) (7.4%) 44,942 45,012 (70) (0.2%)
Executive Director (Douglas Hendry) 45,067 45,686 619 1.4% 125,532 125,532 0 0.0%
Social Work 14,929 15,118 189 1.3% 72,911 72,932 (21) (0.0%)
Total Departmental Budgets 81,108 80,446 (662) (0.8%) 249,738 249,829 (91) (0.0%)
Central Budgets
Other Operating Income and Expenditure (1,184) 582 1,766 303.4% 2,019 2,045 (26) (1.3%)
Joint Boards 626 623 (3) (0.5%) 1,496 1,496 0 0.0%
Non-Controllable Costs 3,518 5,387 1,869 34.7% 20,352 20,352 0 0.0%
Total Central Budgets 2,960 6,592 3,632 55.1% 23,867 23,893 (26) (0.1%)
TOTAL NET EXPENDITURE 84,068 87,038 2,970 3.4% 273,605 273,722 (117) (0.0%)
Financed By
Aggregate External Finance (87,163) (87,163) 0 0.0% (216,731) (216,731) 0 0.0%
Local Tax Requirement (25,965) (25,965) 0 0.0% (55,262) (55,262) 0 0.0%
Contributions to General Fund 0 0 0.0% 2,482 2,482 0 0.0%
Earmarked Reserves 0 0 0.0% (4,094) (4,094) 0 0.0%
Total Funding (113,128) (113,128) 0 0.0% (273,605) (273,605) 0 0.0%
(Deficit)/Surplus for Period (29,060) (26,090) 2,970 0 117 (117)
CURRENT PROJECTED FINAL OUTTURNYEAR TO DATE POSITION
Page 23

Page 24

SUBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 31 AUGUST 2022
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual
Budget
Forecast
Outturn
Forecast
Variance
Variance
£'000 £'000 £'000 % £'000 £'000 £'000 %
Subjective Category
Employee Expenses 63,221 64,126 905 1.4% 170,283 170,512 (229) (0.1%)
Premises Related Expenditure 8,159 7,996 (163) (2.0%) 16,716 16,844 (128) (0.8%)
Supplies and Services 10,276 9,241 (1,035) (11.2%) 23,269 23,459 (190) (0.8%)
Transport Related Expenditure 5,419 4,874 (545) (11.2%) 17,046 17,008 38 0.2%
Third Party Payments 62,064 61,493 (571) (0.9%) 165,601 166,391 (790) (0.5%)
Capital Financing 1,248 0 (1,248) 14,039 14,039 0 0.0%
TOTAL EXPENDITURE 150,387 147,730 (2,657) (1.8%) 406,954 408,253 (1,299) (0.3%)
Income (179,448) (173,821) 5,627 (3.2%) (406,954) (408,136) 1,182 (0.3%)
(Deficit)/Surplus for Period (29,060) (26,090) 2,970 0 117 (117)
YEAR TO DATE POSITION CURRENT PROJECTED FINAL OUTTURN
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget. 
Page 24

Page 25

CHIEF EXECUTIVE’S UNIT – AS AT 31 AUGUST 2022 
The department is currently forecasting spend in line with budget. 
The department has a year to date overspend of £0.255m (7.7%) which can be attributed to profiling issues.   
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Chief Executive 909 909 0 0 0
Head of Financial Services 5,444 5,444 0 0 0
Totals 6,353 6,353 0 0 0
Year to Date Position 
0%
25%
50%
75%
100%
Chief Executive Head of Financial Services
Expenditure to date against the remaining budget for each
Service
YTD… Remaining Budget… 
Key Financial Successes:
• All savings options have been delivered.  
• The department’s 2021-22 outturn position was an underspend of £0.018m.  This resulted from an overall underspend of £2.013m
offset by earmarking of £1.769m due to auto-carry forwards including unspent grants and COVID-19 funding and £0.226m of unspent
budget earmarkings. 
Key Financial Challenges: Proposed Actions to address Financial Challenges:
To continue to deliver a high quality support service function during a time
of substantial uncertainty and challenge arising from continuing reductions
in funding whilst costs are increasing due to high inflation and service
demand caused by world events including the COVID-19 pandemic and
the conflict in Ukraine.
Ensure the team is operating as efficiently and effectively as
possible to enable continued support to departments with reduced
resources by building resilience through knowledge sharing across
the team and maximising the benefits to the service from the
implementation of the Oracle Fusion Financial Ledger System. 
Page 25

Page 26

Carry out a business process review of the Revenues and Benefits
function to determine if there is scope to deliver the service in a more
cost effective manner. 
Work collaboratively with other services of the Council to identify
opportunities to improve the operational and financial efficiency of
services and to support evidence based decision making.
Page 26

Page 27

CHIEF EXECUTIVE’S UNIT – OBJECTIVE SUMMARY AS AT 31 AUGUST 2022 
Service Area YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Executive 128 119 (9) (7.6%) 325 325 0 0.0% Outwith Reporting Criteria
Community Planning
& Development 208 242 34 14.1% 584 584 0 0.0% Profiling - income received ahead of
schedule  
336 361 25 6.9% 909 909 0 0.0%  
Accounting &
Budgeting 1,017 999 (18) (1.8%) 2,374 2,374 0 0.0% Outwith Reporting Criteria
Internal Audit & Fraud 105 105 0 0.0% 231 231 0 0.0% Outwith Reporting Criteria
Revenues & Benefits 1,326 1,345 19 1.4% 2,102 2,102 0 0.0% Outwith Reporting Criteria
Scottish Welfare Fund 787 506 (281) (55.5%) 737 737 0 0.0%
Profile related overspend on third party
payments and income accrued but not yet
received.  
3,235 2,955 (280) (9.5%) 5,444 5,444 0 0.0%    
3,571 3,316 (255) (7.7%) 6,353 6,353 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%. 
Page 27

Page 28

CHIEF EXECUTIVE’S UNIT – SUBJECTIVE SUMMARY AS AT 31 AUGUST 2022 
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 1,921 1,890 (31) (1.6%) 5,173 5,173 0 0.0% Outwith reporting criteria.
Premises 0 0 0 0.0% 0 0 0 0.0% Outwith reporting criteria.
Supplies and
Services 239 258 19 7.4% 695 695 0 0.0% Outwith reporting criteria.
Transport 5 14 9 64.3% 32 32 0 0.0% Underspends on staff travel budgets.
Third Party 8,793 9,248 455 4.9% 25,195 25,195 0 0.0%
An underspend of £0.531m on Housing Benefits
(offset against income) offset by an overspend
against the Scottish Welfare Fund.
Income (7,387) (8,094) (707) 8.7% (24,742) (24,742) 0 0.0%
An overspend of £0.531m on Housing Benefits
(offset against third party payments) and an
overspend against the Scottish Welfare Fund.
Totals 3,571 3,316 (255) (7.7%) 6,353 6,353 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
Page 28

Page 29

An explanation is given for any variance which exceeds £50,000 or 10%.
Page 29

Page 30

CHIEF EXECUTIVE’S UNIT – RED VARIANCES AS AT 31 AUGUST 2022
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation      
0 0.0%   
A red variance is a forecast variance which is greater than +/- £50,000. 
Page 30

Page 31

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – AS AT 31 AUGUST 2022 
The department is currently forecasting spend in line with budget.  
The department has a year to date (YTD) underspend of £0.619m (1.4%).  The year to date underspend position is mainly due to underspends
in employee budgets within schools and learning centres.  Under the Scheme of Devolved School Management schools are permitted
flexibility at the end of the year so no forecast variance is required. The remaining variances are profile related and will be refined through
September. 
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Executive Director
(Douglas Hendry) 105 105 0 0 0
Head of Commercial
Services 9,703 9,703 0 0 0
Head of Education 96,614 96,614 0 0 0
Head of Legal and
Regulatory Support 19,110 19,110 0 0 0
Totals 125,532 125,532 0 0 0
Year to Date Position 
Key Financial Successes:
The 2021-22 year-end consolidated outturn position was an under spend of £0.223m after adjusting for earmarkings. This was due to the
effective contract management of NPDO and Hub School contracts, including a lower than expected insurance premium as a result of the
annual renegotiation of insurance costs. The costs of COVID were contained and minimised where possible across departments, with staff
0%
25%
50%
75%
100%
Executive Director
(Douglas Hendry)
Head of Commercial
Services
Head of Education Head of Legal and
Regulatory Support
Expenditure to date against the remaining budget for each
Service
YTD… Remaining Budget…
Page 31

Page 32

from all areas of the service assisting in planning, implementing and delivering a wide range of additional services in schools and communities
and helping businesses through the return from lockdown. 
Key Financial Challenges: Proposed Actions to address Financial Challenges:
The ongoing impact of COVID-19 Costs are being contained where possible. 
Impact of numbers/uptake in demand led service areas like catering,
design services and licensing.
Continually refine/develop systems to accurately calculate forecast
outturns and the impact on the future financial outlook.
Manage the impact of the Statutory Guidance supporting Nutritional
Requirements for Food and Drink in Schools (Scotland) Regulations
2020, on the cost of producing school meals and also the uptake.
Monitor and report on the impact on costs and on income as the
year progresses.
Support longer term service re-design project for Catering and Cleaning
services to ensure efficiencies and financial savings are secured for the
Council as well as delivery of free school meals for 1140 hours of Early
Learning and Childcare and the phased universal free school meals
expansion in Primary Schools. 
Effective working with partners and support with implementation of
service delivery method. Continual monitoring and review of
budgets.
Legislative/policy requirements not fully funded by Scottish Government
which may put additional burdens on the Council. For example, the
introduction of free school meal payments for holidays.
Analysis of new obligations and whether they incur additional costs
not met through increased grant.
The Council has a requirement to deliver 1140 hours of Early Learning
and Childcare. The initial funding from Scottish Government was based
on individual implementation plans with funding confirmed up to March
2022. The ring fenced grant has been reduced in 2022-23 and an
exercise is required to ensure that the service can be delivered efficiently
and effectively within this reduced funding allocation.
Robust service costings, financial monitoring and timely reporting
to ensure the service can continue to deliver the service within the
financial resources available. 
Impact of high inflationary uplifts within the NPDO/HUB School contracts. Ensuring continued effective contract management of NPDO/HUB
Schools to minimise the impact of high inflationary uplifts. 
Page 32

Page 33

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – OBJECTIVE SUMMARY AS AT 31 AUGUST 2022  
Service Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director
(Douglas
Hendry)
Central/Management
Costs 131 146 15 10.3% 105 105 0 0.0%
The YTD underspend of £15k is
due to budget profiling which will
be refined through September.    
131 146 15 10.3% 105 105 0 0.0%  
Head of
Commercial
Services
Catering (67) (88) (21) 23.9% 965 965 0 0.0%
The YTD overspend of £21k is
due to £11k of expenditure that
has been miscoded and will be
rectified in September and a
number of small profiling
variances that will be refined
through September.
Head of
Commercial
Services
Central/Management
Costs 446 385 (61) (15.8%) 1,018 1,018 0 0.0%
The YTD overspend of £61k is
due to £30k of earmarked
expenditure that will be drawn
down in September to rectify and
a number of profiling issues that
will be refined through
September.
Head of
Commercial
Services
CHORD 27 25 (2) (8.0%) 20 20 0 0.0% Outwith Reporting Criteria
Head of
Commercial
Services
Cleaning (25) 15 40 266.7% 417 417 0 0.0%
The YTD underspend of £40k is
mainly due to the profiling of
income budgets which will be
refined through September.
Head of
Commercial
Services
Culture, Heritage,
Recreation & Sport 2,423 2,432 9 0.4% 5,812 5,812 0 0.0% Outwith Reporting Criteria
Head of
Commercial
Services
Events &
Commercial
Catering
84 23 (61) (265.2%) 113 113 0 0.0%
The YTD overspend of £61k is
due to an under recovery of
income caused by the closure of
the Civic Centre Café and
reduced footfall within Kilmory
Page 33

Page 34

Canteen. There is also an under
recovery of income within Events
as a result of the slow recovery
from the pandemic.
Head of
Commercial
Services
Property Portfolio (152) (114) 38 (33.3%) (194) (194) 0 0.0%
The YTD underspend of £38k is
due to the profiling of rental
income and will be rectified in
September.
Head of
Commercial
Services
Property Services 505 309 (196) (63.4%) 500 500 0 0.0%
The YTD overspend of £196k is
due to a £124K variance within
Renewable Energy due to
profiling and the profiling of
property Services charges.
Profiling will be refined through
September.
Head of
Commercial
Services
Shared Offices 356 372 16 4.3% 1,052 1,052 0 0.0% Outwith Reporting Criteria    
3,597 3,359 (238) (7.1%) 9,703 9,703 0 0.0%  
Head of
Education
Additional Support
for Learning 3,711 3,795 84 2.2% 9,900 9,900 0 0.0%
The YTD underspend of £84k is
due to an accrual for ASN
adaptions, with invoices still to be
received; delays in recruitment of
ASN Assistants and vacancies
within Pupil Support Teachers.
Head of
Education
Central/Management
Costs 729 715 (14) (2.0%) 1,898 1,898 0 0.0% Outwith Reporting Criteria
Head of
Education
Community Learning
& Development 2 2 0 0.0% 10 10 0 0.0% Outwith Reporting Criteria
Head of
Education COVID 407 415 8 1.9% 1,206 1,206 0 0.0% Outwith Reporting Criteria
Head of
Education
Early Learning &
Childcare (2,301) (2,191) 110 (5.0%) 8,328 8,328 0 0.0%
The YTD underspend of £110k is
due to the profiling of teacher
input time in ELC settings.  The
profile will be refined in
September.
Head of
Education Primary Education 14,580 14,852 272 1.8% 35,394 35,394 0 0.0%
The YTD underspend of £272k
within Primary Education is
mainly due to underspends within
school staffing budgets.  Under
the Scheme of Devolved School
Management (DSM) schools are
permitted flexibility at yearend,
Page 34

Page 35

therefore no forecast variance
has been processed in relation to
this. There are also underspends
within Pupil Equity Funding which
are profile related and will be
refined through September. Both
above underspends are partially
offset by a profile related
overspend within Commercial
Refuse which will also be refined
through September.
Head of
Education Pupil Support 921 863 (58) (6.7%) 2,412 2,412 0 0.0%
There is a YTD overspend of
£58k in Schools Residential
Placements.  It is likely that this
will continue to be a pressure in
2022/23 and a forecast projection
is currently being developed.
Head of
Education
Schools - Central
Services 913 894 (19) (2.1%) 2,711 2,711 0 0.0% Outwith Reporting Criteria
Head of
Education
Secondary
Education 14,570 14,883 313 2.1% 34,755 34,755 0 0.0%
The YTD underspend of £313k in
Secondary Education is mainly
due to underspends within school
staffing budgets.  Under the
Scheme of Devolved School
Management (DSM) schools are
permitted flexibility at yearend,
therefore no forecast variance
has been processed in relation to
this. 
33,532 34,228 696 2.0% 96,614 96,614 0 0.0%  
Head of Legal &
Regulatory
Support
Central/Management
Costs 87 95 8 8.4% 256 256 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Community Safety 67 78 11 14.1% 173 173 0 0.0%
The YTD underspend of £11k is
profile related and will be rectified
through September.
Head of Legal &
Regulatory
Support
Elections 201 212 11 5.2% 386 386 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Governance 222 225 3 1.3% 777 777 0 0.0% Outwith Reporting Criteria
Page 35

Page 36

Head of Legal &
Regulatory
Support
Governance, Risk &
Safety 194 199 5 2.5% 540 540 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Legal Services 211 249 38 15.3% 650 650 0 0.0%
The YTD underspend of £38k is
due to a number of small
variances that are profile related
and will be refined through
September.
Head of Legal &
Regulatory
Support
NPDO and Hub
Schools 6,087 6,131 44 0.7% 14,474 14,474 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Procurement,
Commisioning and
Contracts
373 420 47 11.2% 1,132 1,132 0 0.0%
The YTD underspend of £47k is
due to staff vacancies which will
be advertised shortly following
departmental restructure. 
Head of Legal &
Regulatory
Support
Trading Standards &
Advice Services 365 344 (21) (6.1%) 722 722 0 0.0% Outwith Reporting Criteria    
7,807 7,953 146 1.8% 19,110 19,110 0 0.0%      
45,067 45,686 619 1.4% 125,532 125,532 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.  
Page 36

Page 37

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – SUBJECTIVE SUMMARY AS AT 31 AUGUST 2022
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 35,851 36,875 1,024 2.8% 95,713 95,713 0 0.0%
Non-Education: The YTD underspend of £20k is due to delays in recruitment.
Education: The YTD underspend of £1.004m is due to employee budgets within schools and learning
centres. Under the Scheme of Devolved School Management schools are permitted flexibility at the
end of the year so no forecast variance is required.
Premises 2,548 2,370 (178) (7.5%) 7,232 7,232 0 0.0%
Non-Education: There is no variance to report.
Education: The YTD overspend of £178k is mainly due to the profiling of the Commercial Waste
Recharge which will be rectified in September.
Supplies and
Services 4,389 4,548 159 3.5% 12,068 12,068 0 0.0%
Non-Education: The YTD overspend of £49k is due to the profiling of catering purchases which will be
refined through September and a small overspend within tools and equipment.
Education: The YTD underspend of £208k is mainly due to the profiling of Pupil Equity Funding
Budget Allocations from Scottish Government which will be refined through September.  This
underspend is offset slightly by overspends in subscriptions and licensing budgets.
Transport 128 118 (10) (8.5%) 296 296 0 0.0% Outwith Reporting Criteria
Third Party 18,117 18,116 (1) (0.0%) 40,308 40,308 0 0.0% Outwith Reporting Criteria
Income (15,966) (16,341) (375) 2.3% (30,085) (30,085) 0 0.0%
Non-Education: The £57k YTD  under recovery of income is mainly due to the profiling of renewable
energy feed in tariffs which will be refined through September.
Education: The £318k YTD under recovery of income is due to profiling within School Meals,
Education Maintenance Allowance and ASN Assistant budgets which are all profile related and will be
refined through September.
Totals 45,067 45,686 619 1.4% 125,532 125,532 0 0.0%
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%. 
Page 37

Page 38

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – RED VARIANCES AS AT 31 AUGUST 2022 
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
A Red variance is a forecast variance which is greater than +/- £50,000. 
Page 38

Page 39

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – AS AT 31 AUGUST 2022 
The department is currently forecasting an overspend of £0.070m for the year.  This is due to the under-recovery of income in Parks and Pest
Control in Roads and Infrastructure Services. 
The department has a year to date overspend of £1.215m (7.4%).  This is mainly due to additional expenditure in Roads due to capital works
not yet recharged, this will be rectified as the recharges are processed to capital throughout the year.  
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Executive Director (Kirsty
Flanagan) 125 125 0 0 0
Head of Customer Support
Services 7,913 7,913 0 0 0
Head of Development and
Economic Growth 8,204 8,204 0 0 0
Head of Roads and
Infrastructure Services 28,700 28,770 (70) 0 (70)
Totals 44,942 45,012 (70) 0 (70) 
Year to Date Position 
Key Financial Successes:
At the end of financial year 2021-22 the department showed an overall underspend of £0.574m after taking into account all earmarkings. The
main underspends were due to the over-recovery of vacancy savings, additional income in Environmental Health from Private Water Supply
Appraisals and additional Planning Fee income which was partially offset by the under-recovery of Building Warrant income. Overall there was
a favourable net position. 
-95%
-70%
-45%
-20%
5%
30%
55%
80%
105%
Executive Director
(Kirsty Flanagan)
Head of Customer
Support Services
Head of
Development and
Economic Growth
Head of Roads and
Infrastructure
Services
Expenditure to date against the remaining budget for each
Service
YTD
Actual…
Remaining Budget
£000
Page 39

Page 40

Key Financial Challenges: Proposed Actions to address Financial Challenges:
The impact of COVID-19 Costs are being monitored and contained where possible. 
Department / Service ongoing ability to meet future savings / efficiency
requirements.
Monitoring of trends / expenditure levels / service configuration and
the Service Packages Policy Options savings process.
Dangerous buildings costs as there is no budget for this expenditure and
the council has no control over the demand for the service.   
Building Standards, Legal Services and Financial Services are
working closely to manage debt recovery and to consider other
options to minimise corporate risk exposure.  
Due to the nature of the various components of Waste Management there
are ongoing challenges with:
• The introduction of the Deposit Return Scheme
• Uncertainty with recycling income/ gate fee costs due to the           
volatility of the market
• Challenges in the legislative changes around the disposal of      
Biodegradable Municipal Waste 
To closely monitor all service components of Waste Management
and review the Waste Strategy in conjunction with our contractual
partner Renewi (previously Shanks).
Winter Maintenance costs are difficult to estimate as they are very much
dependant on the weather.  
Close monitoring of Winter Maintenance and reporting of the
financial implications through the budget monitoring process. The
Council agreed the winter policy, setting out the intervention level
and locations to be treated.  The number of treatments is determined
by weather conditions. The current budget provision provides for 58
full equivalent runs. There is a sophisticated weather monitoring
system in place consisting of several weather stations, this is
supported by a forecasting and metrological service which is
collaboratively procured by West of Scotland local authorities.
Rising cost of materials across the service will result in a reduction in
activity or overspends. Specifically there have been significant increases
in the price of salt and bitumen in recent months.
Costs are monitored regularly and contained as much as possible,
with any unavoidable overspends highlighted as soon as known. 
Page 40

Page 41

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 31 AUGUST 2022
Service
Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director (Kirsty
Flanagan)
Central/Management
Costs 94 94 0 0.0% 125 125 0 0.0% Outwith Reporting Criteria.    
94 94 0 0.0% 125 125 0 0.0%  
Head of
Customer
Support
Services
Central/Management
Costs 52 55 3 5.5% 165 165 0 0.0% Outwith Reporting Criteria.
Head of
Customer
Support
Services
Communications 92 93 1 1.1% 285 285 0 0.0% Outwith Reporting Criteria.
Head of
Customer
Support
Services
Customer Service
Centres 479 466 (13) (2.8%) 1,314 1,314 0 0.0% Outwith Reporting Criteria.
Head of
Customer
Support
Services
HR 756 761 5 0.7% 2,153 2,153 0 0.0% Outwith Reporting Criteria.
Head of
Customer
Support
Services
ICT 1,500 1,609 109 6.8% 3,950 3,950 0 0.0%
One-off income in ICT that will be
used to offset a saving later in
the year.
Head of
Customer
Support
Services
Registrars (51) (6) 45 (750.0%) 46 46 0 0.0%
Income received ahead of
profiled budget, this will be
monitored closely in the coming
months.    
2,828 2,978 150 5.0% 7,913 7,913 0 0.0%  
Head of
Development &
Economic
Growth
Airports 544 503 (41) (8.2%) 1,162 1,162 0 0.0% Outwith Reporting Criteria.
Head of
Development &
Economic
Growth
Building Control (160) (60) 100 (166.7%) (135) (135) 0 0.0%
Building warrant income received
ahead of profiled budget, this will
be monitored closely in the
coming months.
Page 41

Page 42

Head of
Development &
Economic
Growth
Central/Management
Costs 169 196 27 13.8% 574 574 0 0.0% Budget needs to be profiled in
line with anticipated expenditure.
Head of
Development &
Economic
Growth
Culture & Heritage 90 44 (46) (104.6%) 216 216 0 0.0%
Expenditure ahead of budget
profile for Events and Festivals. 
Any overspend will be covered
by an earmarked reserve.
Head of
Development &
Economic
Growth
Development
Management (433) 18 451 2505.6% 227 227 0 0.0%
Planning Fee income received
ahead of profiled budget, this will
be monitored closely in the
coming months.
Head of
Development &
Economic
Growth
Development Policy 148 136 (12) (8.8%) 373 373 0 0.0% Outwith Reporting Criteria.
Head of
Development &
Economic
Growth
Economic
Development (201) 691 892 129.1% 1,250 1,250 0 0.0%
Income for Islands Infrastructure
Fund and Place Based
Investment received in advance
of payments.
Head of
Development &
Economic
Growth
Environmental
Health 385 436 51 11.7% 1,214 1,214 0 0.0%
Appraisal of Water Supplies
income ahead of profiled budget,
this will be monitored closely in
the coming months.
Head of
Development &
Economic
Growth
Environmental
Initiatives 63 42 (21) (50.0%) 114 114 0 0.0% Profile of third party payment.
Head of
Development &
Economic
Growth
Housing 2,133 1,926 (207) (10.8%) 2,990 2,990 0 0.0%
Expenditure payments for
HEEPS incurred prior to grant
income being received which is
partially offset with an
underspend in Private Sector
Housing Grant payments.
Head of
Development &
Economic
Growth
Transportation
Policy 77 83 6 7.2% 219 219 0 0.0% Outwith Reporting Criteria.    
2,815 4,015 1,200 29.9% 8,204 8,204 0 0.0%  
Head of Roads
& Infrastructure
Services
Amenity 1,629 1,424 (205) (14.4%) 2,800 2,870 (70) (2.5%)
Under recovery of income
forecasted for both Parks for Hire
of Facilities income (£30k) and
Pest Control for external income
(£40k).  The year to date
variance includes both of these
Page 42

Page 43

issues alongside a reduction in
turnstile income in Public
Conveniences which is being
closely monitored and update
regularly.
Head of Roads
& Infrastructure
Services
Car Parking (97) (280) (183) 65.4% (622) (622) 0 0.0%
Income received behind profiled
budget, this will be monitored
closely in the coming months.
Head of Roads
& Infrastructure
Services
Central/Management
Costs 1,193 1,191 (2) (0.2%) 2,874 2,874 0 0.0% Outwith Reporting Criteria.
Head of Roads
& Infrastructure
Services
Depots 128 110 (18) (16.4%) (469) (469) 0 0.0%
Rental income slightly behind
profiled budget, this should be
rectified as we progress through
the year.
Head of Roads
& Infrastructure
Services
Fleet & Transport 3,388 3,246 (142) (4.4%) 8,510 8,510 0 0.0%
Delay in fuel recharge, this will
be rectified in the next monitoring
period.
Head of Roads
& Infrastructure
Services
Infrastructure 198 256 58 22.7% 708 708 0 0.0%
Coastal and Flood budget
requires to be profiled in line with
the anticipated expenditure.
Head of Roads
& Infrastructure
Services
Marine (1,504) (2,233) (729) 32.7% (4,371) (4,371) 0 0.0%
Grant income budgeted for but
not yet received in Ferries and
income in Piers & Harbours
behind profiled budget, this will
be monitored closely in the
coming months.
Head of Roads
& Infrastructure
Services
Network & Traffic
Management 103 25 (78) (312.0%) 141 141 0 0.0%
Income currently behind profiled
budget, this will be monitored
closely in the coming months.
Head of Roads
& Infrastructure
Services
Road Safety 35 42 7 16.7% 154 154 0 0.0% Small supplies and Services
budget has not yet been spent.
Head of Roads
& Infrastructure
Services
Roads & Lighting 3,374 2,057 (1,317) (64.0%) 6,153 6,153 0 0.0%
Expenditure for materials and
private contractors in the Roads
Operational Holding Account
higher current profiled budget
due to high level of capital
expenditure, this will be offset
with an increase in income once
recharges are processed against
capital throughout the year.
Head of Roads
& Infrastructure
Services
Waste 3,357 3,401 44 1.3% 12,822 12,822 0 0.0% Outwith Reporting Criteria.
Page 43

Page 44

11,804 9,239 (2,565) (27.8%) 28,700 28,770 (70) (0.2%)      
17,541 16,326 (1,215) (7.4%) 44,942 45,012 (70) (0.16%)   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%. 
Page 44

Page 45

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – SUBJECTIVE SUMMARY AS AT 31 AUGUST 2022 
Subjective Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 12,914 12,945 31 0.2% 35,385 35,385 0 0.0% Outwith Reporting Criteria.
Premises 838 812 (26) (3.2%) 2,990 2,990 0 0.0% Outwith Reporting Criteria.
Supplies and Services 4,506 3,224 (1,282) (39.8%) 8,046 8,046 0 0.0%
Material expenditure in the Roads Operational Holding Account
higher than the profiled budget due to high level of capital
expenditure, this will be offset with an increase in income as
recharges are processed against capital throughout the year.
Transport 5,067 4,459 (608) (13.6%) 15,837 15,837 0 0.0%
Overspend in Fleet for vehicle repairs and additional external
leases which are offset with additional income for recharges to
the individual departments and a delay in fuel recharge, this will
be rectified in the next monitoring period.
Third Party 14,796 13,863 (933) (6.7%) 36,346 36,346 0 0.0%
Various grant payments made in Economic Development which
are offset against actual income received (£456k).  Private
contractor expenditure in the Roads Operational Holding
Account higher than the profiled budget due to high level of
capital expenditure, this will be offset with an increase in
income as recharges are processed against capital throughout
the year (£531k).  HEEPS expenditure against a zero budget
which will be offset with additonal income once grant is received
(£487k).
Capital Financing 0 0 0 0.0% 1,592 1,592 0 0.0% Outwith Reporting Criteria.
Income (20,580) (18,977) 1,603 (8.5%) (55,254) (55,184) (70) 0.1%
Under recovery of income forecast for both Parks for Hire of
Facilities income (£30k) and Pest Control for external income
(£40k).  The year to date variance mainly due to income for
Islands Infrastructure Fund (£740k) and Place Based
Investment (£712k) against a zero budget as well as additional
Planning Fee income received.
Totals 17,541 16,326 (1,215) (7.4%) 44,942 45,012 (70) (0.2%)
Page 45

Page 46

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 46

Page 47

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – RED VARIANCES AS AT 31 AUGUST 2022
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation             
A red variance is a forecast variance which is greater than +/- £50,000.
Page 47

Page 48

SOCIAL WORK – AS AT 31 AUGUST 2022 
The department is currently forecasting an overspend of £0.021m (0.0%) which is mainly due to high demand for services.   
The department has a year to date underspend of £0.189m (1.3%). This is mainly due to an over-recovery of vacancy savings. 
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Chief Officer Integration 2,510 1,216 1,294 1,061 233
Head of Adult Services 54,780 56,547 (1,767) (1,551) (216)
Head of Children and Families 15,178 14,734 444 407 37
Head of Strategic Planning and
Performance 443 435 8 8 0
Totals 72,911 72,932 (21) (75) 54
Year to Date Position 
-25%
0%
25%
50%
75%
100%
Chief Officer
Integration
Head of Adult
Services
Head of Children
and Families
Head of
Strategic
Planning and
Performance
Expenditure to date against the remaining budget
for each Service
YTD… Remaining Budget…
Key Financial Successes:
Delivered an underspend at the end of 2021/22 after automatic earmarkings and full repayment of £2.759m of debt owed to the Council for
prior year deficits. This should allow for future investment and transformation across Social Work with prior year deficits now fully repaid. 
Page 48

Page 49

Key Financial Challenges: Proposed Actions to address Financial Challenges:
Deliver the outstanding savings total for 2022/23 of £1.436m (as at August
2022).
Maintain a close working relationship with the HSCP Service
Improvement Team in order to quickly and efficiently identify and
assess options for delivering the outstanding savings.
Development and delivery of future service redesigns which will be
necessary to contain service expenditure within the allocated resource in
the medium to long term.
Support from finance to assist strategic managers to look beyond
the short term to identify and plan the changes which will be needed
to address the expected ongoing budget challenge over the next 3
to 5 years.
Support the HSCP through the recovery from the COVID-19 pandemic.
There have been additional costs and pressures across the HSCP as a
direct result of the partnership’s response to COVID-19. These costs are
captured and reported to the Scottish Government via Mobilisation Plans.
Support from finance to assist the service in capturing details of all
additional costs associated with the response to COVID-19 to
ensure these are included in Scottish Government funding returns. 
Use of agency staff to support service delivery across Older People
services due to recruitment and retention challenges within the service.
Year to date spend £0.663m at August 2022.
Close working relationship to support costing of a recovery route to
stabilise service. 
Page 49

Page 50

SOCIAL WORK – OBJECTIVE SUMMARY AS AT 31 AUGUST 2022
Service Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Officer
Integration
Integration
Headquarters 202 216 14 6.5% 446 442 4 0.9% Outwith reporting criteria
Chief Officer
Integration
Social Work
Central
Support
(231) 462 693 150.0% 2,064 774 1,290 62.5%
The YTD variance is due to
underspends on centrally held funds
(£340k) and YTD over-recovery on
vacancy savings (£261k) combined
with YTD underspends on central
repairs and Covid-19 funding (£54k).
In addition, there are YTD
underspends on Audit Fees as a
result of timing of invoices. The
forecast underspend reflects
forecast underspends on centrally
held funds (£800k) combined with
forecast over-recovery on vacancy
savings (£459k) and additional
Covid-19 funding to adjust for lost
income from clients (£33k).    
(29) 678 707 156.5% 2,510 1,216 1,294 63.4%  
Head of
Strategic
Planning &
Performance
Management &
Central Costs 154 149 (5) (3.4%) 414 407 7 1.7%
Outwith reporting criteria
Head of
Strategic
Planning &
Performance
Service
Development 19 19 0 0.0% 29 28 1 3.4%
Outwith reporting criteria    
173 168 (5) (3.4%) 443 435 8 5.1%  
Head of Health
and Community
Care
Management &
Central Costs 139 143 4 2.8% 258 241 17 6.6%
Outwith reporting criteria
Head of Health
and Community
Care
Older People 7,812 7,778 (34) (0.4%) 37,102 37,228 (126) (0.3%)
Outwith reporting criteria. The
forecast overspend reflects demand
for Care Home Placements (£449k)
and Respite (£194k). This is partially
offset by a forecast underspend
across Homecare (£519k) based on
Page 50

Page 51

current known commitments for the
service. However, the Homecare
underspend of £519k includes a
significant forecast overspend on
staff costs, including a forecast
overspend on Agency Staff costs
(£631k).    
7,951 7,921 (30) (0.4%) 37,360 37,469 (109) (0.3%)  
Head of Acute
and Complex
Care
Learning
Disabilities 784 134 (650) (485.1%) 12,249 13,660 (1,411) (11.5%)
The YTD overspend is due to
demand for services within
Supported Living. This is partially
offset by underspends on staff
payroll costs in Day Services and
YTD spend on Respite and
Residential Placement due to a
combination of the impact of rates
increases on invoice timing and
timing of demand for placements. 
The forecast overspend reflects
higher than budgeted demand for
services in Supported Living (£841k)
and Joint Residential (£559k).
Head of Acute
and Complex
Care
Management &
Central Costs 38 48 10 20.8% 125 120 5 4.0%
The YTD underspend is as a result
of budget profiling on Staff Training
costs. 
Head of Acute
and Complex
Care
Mental Health 130 84 (46) (54.8%) 2,404 2,493 (89) (3.7%)
Outwith reporting criteria. The
forecast overspend reflects higher
than budgeted demand for services
in Supported Living (£32k) and
Residential Placements (£57k). 
Head of Acute
and Complex
Care
Physical
Disability 720 633 (87) (13.7%) 2,642 2,805 (163) (6.2%)
The YTD overspend is due to
demand for services within
Supported Living partially offset by
YTD underspends on Residential
Placements due to the impact of
rates increases on invoice timing.
The forecast overspend reflects
higher than budgeted demand for
services in Supported Living (£68k),
Residential Placements (£78k) and
Respite (£19k). 
1,672 899 (773) (532.7%) 17,420 19,078 (1,658) (17.4%)  
Page 51

Page 52

Head of
Children &
Families
Child
Protection 1,035 1,055 20 1.9% 3,307 3,280 27 0.8%
Outwith reporting criteria
Head of
Children &
Families
Children with a
Disability 302 313 11 3.5% 905 894 11 1.2%
Outwith reporting criteria
Head of
Children &
Families
Criminal
Justice 60 108 48 44.4% 88 79 9 10.2%
The YTD underspend is as a result
of staff turnover and vacancies
combined with additional income
received for provision of Structured
Deferred Sentences and Bail
Supervision in 2021/22 (not
accrued). The forecast underspend
is on payroll costs as a result of staff
turnover and vacancies.
Head of
Children &
Families
Looked After
Children 2,697 2,852 155 5.4% 7,637 7,212 425 5.6%
The YTD underspend is due to
underspends in Adoption and
Fostering due to demand for these
services combined with
underspends on residential
placements and additional income in
the Hostels for provision of meals. 
The forecast underspend reflects
demand for Fostering and Adoption
services combined with demand for
Residential Placements as well as
over-recovery of income across
Supporting Young People Leaving
Care for UASC activity from the
Home Office. This is partially offset
by overspends in the Children's
Houses on payroll costs. 
Head of
Children &
Families
Management &
Central Costs 1,068 1,124 56 5.0% 3,241 3,269 (28) (0.9%)
The YTD variance is as a result of
staff vacancies which have yet to be
transferred to vacancy savings
combined with YTD underspends on
staff travel. The forecast variance is
outwith reporting criteria.    
5,162 5,452 290 5.3% 15,178 14,734 444 2.9%  
GRAND
TOTAL   14,929 15,118 189 1.3% 72,911 72,932 (21) (0.0%)   
Page 52

Page 53

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.  
Page 53

Page 54

SOCIAL WORK – SUBJECTIVE SUMMARY AS AT 31 AUGUST 2022 
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 11,360 11,394 34 0.3% 30,790 31,007 (217) (0.7%)
The YTD underspend is outwith reporting criteria.
The forecast overspend is due to overspends in
Residential Units (both children and adults) as a result
of use of bank staff and Homecare due to use of
agency staff. This is partially offset by the forecast
over-recovery on vacancy savings (£459k).
Premises 361 313 (48) (15.3%) 1,149 1,278 (129) (11.2%)
The YTD overspend arises mainly due to overspends
on rental charges and refuse collections (due to
budget profiling) partially offset by YTD underspends
on central repairs costs.
The forecast overspend is as a result of Supported
Living rental costs in Learning Disability and utility
costs at the Hostels.
Supplies &
Services 813 742 (71) (9.6%) 1,256 1,431 (175) (13.9%)
The YTD overspend reflects slippage on the
achievement of budget savings.
The forecast overspend is mainly due to forecast
slippage on budget savings (£119k) combined with
overspends on catering purchases, staff subsistence
at Tigh a Rudha and cost of prepared meals at
Ardfenaig.
Transport 204 266 62 23.3% 630 593 37 5.9%
The YTD underspend is due to various travel
underspends across the service which is to be
expected due to the  changes to travel habits as a
result of Covid-19 and the current level of staffing
vacancies across the service. 
The forecast year end outturn reflects the continued
reduction in travel costs across the service and an
expectation that different ways of working will continue
to reduce future spending on travel.
Third Party 19,546 19,398 (148) (0.8%) 61,672 62,461 (789) (1.3%)
Both the YTD and forecast full year overspend reflects
the higher than budgeted demand for purchased care
services in Older People and Learning Disability. 
Income (17,355) (16,995) 360 (2.1%) (22,586) (23,838) 1,252 (5.5%)
Both the YTD and forecast over recovery of income is
mainly due to increased income from fees, charges
and recharges.
Totals 14,929 15,118 189 1.3% 72,911 72,932 (21) (0.0%)   
Page 54

Page 55

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 55

Page 56

SOCIAL WORK – RED VARIANCES AS AT 31 AUGUST 2022
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Social Work Central Support 2,064 774 1,290 62.5%
The forecast underspend reflects forecast underspends on centrally held funds (£800k)
combined with forecast over-recovery on vacancy savings (£459k) and additional Covid-
19 funding to adjust for lost income from clients (£33k).
Looked After Children 7,637 7,212 425 5.6% 
The forecast underspend reflects demand for Fostering and Adoption services
combined with demand for Residential Placements as well as over-recovery of income
across Supporting Young People Leaving Care for UASC activity from the Home Office.
This is partially offset by overspends in the Children's Houses on payroll costs
Older People 37,102 37,228 (126) (0.3%)
The forecast overspend reflects demand for Care Home Placements (£449k) and
Respite (£194k). This is partially offset by a forecast underspend across Homecare
(£519k) based on current known commitments for the service. However, the Homecare
underspend of £519k includes a significant forecast overspend on staff costs, including
a forecast overspend on Agency Staff costs (£631k).
Physical Disability 2,642 2,805 (163) (6.2%) The forecast overspend reflects higher than budgeted demand for services in Supported
Living (£68k), Residential Placements (£78k) and Respite (£19k). 
Learning Disability 12,249 13,660 (1,411) (11.5%) The forecast overspend reflects higher than budgeted demand for services in Supported
Living (£841k) and Joint Residential (£559k).
Mental Health 2,404 2,493 (89) (3.7%) The forecast overspend reflects higher than budgeted demand for services in Supported
Living (£32k) and Residential Placements (£57k). 
A red variance is a forecast variance which is greater than +/- £50,000. 
Page 56

Page 57

MONITORING OF SAVINGS – AS AT 31 AUGUST 2022
New policy savings were identified for the three year period 2022-23 to 2024-25 and these were agreed by Council in February 2022.  Council
agreed to policy savings of £0.280m in 2022-23 rising to £0.286m by 2024-25. 
The position of historical policy saving options is as follows:
- 2021/22 – those not delivered or that have further increase in value in 2022-23 onwards total £0.732m
- 2020/21 – those not delivered total £0.050m
- 2019/20 – all delivered
- 2018/19 - those not delivered total £0.498m
The 2022-23 savings have been removed from departmental budgets, however, it is important to monitor whether the saving has actually been
delivered to ensure that costs are not continuing resulting in an overspend by the end of the year.  It is also important to ensure that any
preparatory work required to deliver savings in future years is on track. 
There are four savings categorised as having a potential shortfall and one currently delayed as summarised below:
Saving Saving
Agreed
Status Detail Shortfall/
Delayed
Value
TB07 – Depots  Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
Create one main depot in key areas to reduce costs – it has become
apparent that the operating costs of the single redeveloped site in
each town will increase, reducing the anticipated saving.  Work
ongoing on a depot consolidation scheme in Lochgilphead and work
is progressing to outline various funding options for discussion. A
project is also underway for Bowmore
£107,500
TB13b Roads and
Amenity Services
charging (non-
statutory services)
Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
The original proposal was to introduce charges for providing lighting
design and increase charges by 20% for road construction consents,
skips, scaffolds, hoarding, permits and licences. Whilst some
additional income has been generated through third party works,
opportunities are expected to be limited over the foreseeable future
due to staff shortages and other competing demands
£100,000
TB12b Stadiums Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
Discussions had stalled with partners in the Oban and Lorn area with
regard to Mossfield stadium to create a sports Hub, attract external
funding to improve facilities and therefore attract additional events to
the arena.  The users group has now reconvened and will be
reporting to the steering group. It should be noted there is generally a
downturn in usage of pitches partly due to more clubs booking all
weather pitches at high schools and the loss of a well established
club disbanding which will result in the loss of income.
£20,000
Page 57

Page 58

DEG05 – Building
Standards
Feb-20 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
Building market has slowed due to the increase in cost and
availability of some materials.  Reservations that the type of
applications we receive may not realise sufficient additional income
using the BCIS guide.
£50,000
TB09 – Public
Conveniences
Feb-18 Delayed - The full
saving will not be
achieved in line with
the original estimated
timescale.  
Tender returns have been received significantly over the available
budget and work is underway to profile different options to take this
scheme forward in whole or in part.
£24,000 
All policy saving options previously agreed are noted in the table below for information. 
Page 58

Page 59

2022-23 2022-23
£000 FTE
Chief Executive's Unit
FS02 Feb-22 Financial
Services
Reduction of vacant 0.4FTE Local Tax
Assistant role
10.0 0.40 Delivered
Executive Director Douglas Hendry
PROP01 Feb-21 Commercial
Services
Rationalisation of the Council's property
estate over a three year programme to
identify properties which can either be
disposed of or used to generate
commercial income
294.20 4.0 Still to be Implemented
TB17 Feb-18 Commercial
Services
Identify opportunities for office
rationalisation and raising income
121.50 0.0 On Track to be Delivered
CS01 Feb-22 Commercial
Services
Climate Change & Resource Efficiency 63.0 0.00 On Track to be Delivered
CS03 Feb-22 Commercial
Services
Stretch Targets for One Council Income &
Events
20.0 0.00 On Track to be Delivered
ED5 Feb-21 Education Review and reduce Clerical Support
Entitlement using updated school rolls.
121.00 5.7 Delivered
ED01 Feb-22 Education Removal of Community Learning
Development Manager Post
66.5 1.00 Delivered
Executive Director Kirsty Flanagan
CSS03 Feb-22 Customer
Support
Services
Restructure of CSP/Registration Team at
Helensburgh Civic Centre
19.0 0.50 On Track to be Delivered
DEG01 Feb-22 Development
and Economic
Growth
Crown Estate Administration Contribution
to Project Delivery
101.0 0.00 On Track to be Delivered
DEG05(a) Feb-20 Development
and Economic
Growth
Raise additional fees by adopting the
current Building Cost Information Service
(BCIS) guide for the cost of building work.
Regular service users have been
informed of this change.
50.00 0.0 Potential Shortfall
DEG02 Feb-21 Development
and Economic
Growth
Reduction to overtime budget in the
provision of fire cover at the airports for
weather delayed flights.  Arrangements
are in place that staff no longer remain at
the airport and there is a cut-off period.
22.00 0.0 On Track to be Delivered
DEG07 Feb-21 Development
and Economic
Growth
Additional income through fees and
charges for s64 Non-Material Amendment
Submissions, non e-planning application
submissions and property history
searches
20.00 0.0 Delivered
DEG10 Feb-21 Development
and Economic
Growth
Maximise income through additional
private water supplies income from risk
assessments of supplies  and introducing
a new charge for the provision of shellfish
movement documents
17.50 0.0 Delivered
TB07 Feb-18 Roads and
Infrastructure
Services
Create one main depot in key areas to
reduce costs
172.50 0.0 Potential Shortfall
TB13b Feb-18 Roads and
Infrastructure
Services
Roads & Amenity Services charging (non-
statutory services)
150.00 0.00 Potential Shortfall
R&I17 Feb-21 Roads and
Infrastructure
Services
Public transport fare scale increase 76.00 0.0 On Track to be Delivered
R&I03 Feb-21 Roads and
Infrastructure
Services
Administrative support - rationalise across
service
50.00 2.0 On Track to be Delivered
R&I05 Feb-21 Roads and
Infrastructure
Services
Design service fees - bringing in line with
industry standards and reduce cost of
consultancy. Two posts created as a
spend to save
50.00 -2.0 On Track to be Delivered
R&I09 Feb-21 Roads and
Infrastructure
Services
Road inspections find and fix -  reduce
reactive work by proactivity. Moving to AI
technology as technology develops
40.00 1.0 On Track to be Delivered
TB12b Feb-18 Roads and
Infrastructure
Services
Review charges for stadiums to enable
improvement work
30.00 0.0 Potential Shortfall
R&I04 Feb-21 Roads and
Infrastructure
Services
Fees and charges - commercial waste,
TTROs, permits/licenses. Access to debt
recovery systems will assist. One post
created as a spend to save
25.00 -1.0 On Track to be Delivered
TB09 Feb-18 Roads and
Infrastructure
Services
Public Conveniences - Progress
sustainable models including turnstiles
and franchising; establish simpler asset
transfer process
24.00 0.0 Delayed
R&I16 Feb-21 Roads and
Infrastructure
Services
Introduce new fees for electric vehicle
charging
16.00 0.0 On Track to be Delivered
R&I15 Feb-21 Roads and
Infrastructure
Services
Emergency services support and fuel
provision from our fuel supplies
0.50 0.0 Still to be Implemented
TOTAL 1,559.7 11.6
Status of ImplementationTemplate
Ref
Saving
Agreed
Service Savings Option
Page 59

Page 60

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE 
13 OCTOBER 2022
FINANCIAL RISKS ANALYSIS 2022-23  
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to provide a summary of the key financial risks
facing the Council.   
1.2  A number of Council wide risks, both revenue and capital have been identified
along with risks for each department and service of the Council.  For each
departmental risk the financial impact has been quantified and the likelihood
assessed based on the standard risk matrix. 
1.3 There are 5 Council wide revenue risks identified for 2022-23 currently amounting
to £2.058m. 
1.4 There are currently 42 departmental risks totalling £5.745m.  Of the 42
departmental risks, one is categorised as almost certain and 7 are categorised as
likely.   
1.5 The financial risks are monitored routinely and actions put in place to continue to
mitigate the risks.   
Page 60

Page 61

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE 
13 OCTOBER 2022
FINANCIAL RISKS ANALYSIS 2022-23  
2. INTRODUCTION 
2.1 This report outlines the process and approach developed in carrying out a
financial risks analysis and provides a note of the current assessment of financial
risks for 2022-23. 
3 DETAIL 
3.1 Introduction 
3.1.1 The Council is currently in a period of significant financial challenge.  In
developing its budget to address both restricted resources and cost and demand
pressures there are a number of financial risks the Council needs to consider and
manage. 
3.1.2 There are a number of risks that affect the income or expenditure across the
whole council and these have been identified.  Financial risks have been
considered by each department and service of the Council.   
3.1.3 For each risk, the financial impact has been quantified and the likelihood
assessed based on the standard risk matrix as follows: 
1 – Remote
2 – Unlikely
3 – Possible
4 – Likely
5 – Almost Certain 
3.1.4 The Argyll and Bute Integrated Joint Board (IJB) with responsibility for Social
Work and a range of Health services was established and came into effect on 1
April 2016.  The IJB is responsible for financial and strategic oversight of these
services.  It is the responsibility of the IJB to consider the individual financial risks
associated with Integration Services and they are therefore not contained within
this report.  A Council wide risk has been included in respect of the IJB being
unable to deliver the social care service within the budget allocated. 
3.2 Council Wide Risks 
Revenue  
3.2.1 Utility costs remain a volatile area and it is difficult to accurately predict how the
prices could vary.  The outturn in respect of utilities for 2021-22 was an
underspend of £0.310m which was partly due to fixed price contracts that had
Page 61

Page 62

been secured which have now expired. With the volatility of utilities pricing it is
very difficult to predict the impact going forward but a financial risk based on a
20% variation in utility costs amounts to £0.706m. 
3.2.2 The estimated level of council tax income is based on current and forecast Band
D equivalents and non-payment rates.  This reflects our most recent experience in
terms of the council tax base and likely collection rates.  A 1% variation in council
tax income amounts to approximately £0.553m.     
3.2.3 At the budget meeting on 24 February 2022, the Council agreed 6 new policy
savings options that would deliver savings over the period 2022-23 to 2024-25. 
The savings to be delivered in 2022-23 amount to £0.280m.  Whilst the Council
have a good track record in delivering savings, a 10% shortfall on this savings
target would amount to £0.028m.    
3.2.4 In respect of the Health and Social Care Partnership, it is the responsibility of the
Chief Officer and Chief Financial Officer to manage the HSCP financial position. 
If an overspend is forecast, a budget recovery plan will be prepared and
submitted to the IJB, the Council and NHS Highland.  Where recovery plans are
unsuccessful and an overspend occurs at the financial year end, and the HSCP
has insufficient reserves to meet the overspend, then the partners will be required
to make additional payments to the HSCP.  Whilst any additional payments by the
Council and NHS Highland will be deducted from future years funding, there is still
a financial risk that the Council may have to pay out additional monies in year.  As
at 31 August 2022, the net HSCP outturn in 2022-23 is estimated to be a £0.521m
overspend (£0.021m from Social Work and £0.500m from Health). 
3.2.5 There is an ongoing requirement to fund unavoidable inflationary cost increases in
areas like fuel, food etc. This has been predominantly caused by the lack of
availability of supply of labour and materials as a result of the COVID-19
pandemic, the UK exit from the European Union, Russia’s invasion of Ukraine and
sanctions on Russian owned entities.  The Bank of England are currently
forecasting that inflation will continue to rise until around Quarter 1 of 2023 where
after they forecast that it will start to fall.  We will continue to closely monitor the
situation and update our financial forecasts using the best information available to
us. 
3.2.6  The Council wide risks are noted within the table below.   
Description Likelihood Assessed
Financial Impact
£000
Energy costs increase by 20% greater
than anticipated
3 706
1% variation in Council Tax Income 2 553
10% shortfall on Savings Options 2 28
IJB refer to Council for additional
funding to deliver social work services
3 21
1% variation of General Inflation Risk  4 750
Total  2,058 
Page 62

Page 63

Capital 
3.2.7 The finance settlement announcement on 20 December 2021 provided details of
the Local Government funding for 2022-23 and there is therefore certainty as to
what our funding is in respect of General Capital Grant and the specific capital
grants already distributed. 
3.2.8  The capital plan for 2022-23 includes an estimate of £1.387m in respect of capital
receipts.   This is based on an assessment provided by the Special Projects Team
in January 2022.  A 10% variation equates to £0.139m and this would require to
be managed across the capital programme.   
3.2.9 
3.2.10 
3.2.11
General feedback from Scotland Excel and the Project Managers indicates that
price increases and uncertainty are being experienced as well as disruptions to
the supply chain and longer lead times, particularly in relation to the construction
sector and material availability. This can be attributed to a number of factors such
as the COVID-19 pandemic, UK exit from the European Union, invasion of
Ukraine and sanctions on Russian owned entities to name a few. 
The increased rate of inflation impacts costs such as energy prices, labour,
packaging and transport. These all have an effect on the overall contract price
and make it extremely challenging to manage expenditure and the availability of
supply. 
While it has been possible to estimate the impact of these pressures on some
projects, and therefore include those projections within the capital monitoring
report, for others it has been more difficult and an overspend has not been
forecast at this stage but there are likely to be further significant financial impacts
not yet reported within the following projects: 
- Rothesay Pavilion
- Harbour Investment Programme
- Helensburgh Waterfront Development
- Universal Free School Meals 
3.2.12 For those liabilities/risks to the capital programme that were known at the start of
2022-23 it was agreed at the budget meeting in February 2022 to use amounts
from the Unallocated General Fund, the 2021-22 Revenue Surplus, COVID-19
specific funding and additional borrowing to mitigate these risks.   
3.3 Departmental/Service Risks 
3.3.1 The detail of each departmental financial risk is included within Appendix 1.  The
following table provides a summary of the number of risks within each department
and likelihood category with the financial impact. 
Page 63

Page 64

Department 1 - Remote 2 - Unlikely 3 - Possible 4 - Likely 5 - Almost
Certain Total
No £000 No £000 No £000 No £000 No £000 No £000
Chief Executive's
Unit 1 125 0 0 2 115 0 0 1 500 4 740
Executive Director
Douglas Hendry 2 20 7 545 9 870 4 380 0 0 22 1,815
Executive Director
Kirsty Flanagan 3 160 3 240 8 1,735 3 1,155 0 0 16 3,240
Total 6 305 10 785 18 2,620 7 1,535 1 500 42 5,745 
3.3.2 The current top three risks in terms of the financial impact are noted in the table
below. 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance
- Bridges,
Culverts &
Sea Defences
Extreme localised weather may result in loss
of bridge, culvert, road or sea defence.        
3 750
Roads and
Infrastructure
Services
Residual
Waste H&L
and Tiree
There is a potential increase to tipping fees
and haulage costs for H&L residual waste.  The
Council’s supplier Barr Environmental
(contract to end of 2023) lost a tribunal
relating to the underpayment of landfill tax,
which may have led to the Council having to
source alternatives at a higher cost.    Barr
appealed the decision which was heard in the
Spring and they won the case which should
have reduced or eliminated this financial risk. 
However, the Scottish Government laid an
Amendment Order on Friday 1 July 2022
which came into force at 1700 on 1 July which
indicates that Landfill tax will be due on
materials previously not chargeable and we
have now received notification of an increase
in the cost which officers are currently
assessing
4 655
Financial
Services
Council Tax
Debt
Collection
Recovery
Recovery of debt becomes more difficult to
pursue in the current economic climate.  This
is in relation to historical debt that has
accumulated over many years therefore any
adverse collection rates will impact on the
year end debt provision as opposed to the in-
year financial position, hence no forecast
variance has been reported within the current
year.  
5 500 
Page 64

Page 65

3.3.3 The other risks classified as likely are: 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads Materials -
Bitumen
Increased cost of asphalt material due to
price of crude oil rising.  Discussions
emerging from the industry about possible
rationing of bitumen which, if applied, will
affect our programmes due to availability
4 400
Commercial
Services
Catering Costs –
Changes to Food
and Drink in
Schools
Standards
The Scottish Government reviewed the
regulations that govern the food and
drinks currently provided in schools. The
proposed changes were published in June
2019 and were implemented from Easter
2021.  The revised standards focus on
reducing sugar, reducing red and red
processed meat and increasing fibre. Thus
far, there has been an increase in costs
and a reduction in demand for school
meals. 
4 150
Commercial
Services
Catering
Purchases
Increased supplier charges.  This estimate
does not include the additional risk to food
costs and uptake from the changes to food
and drink standards in schools.
4 100
Legal and
Regulatory
Support 
Contract RPI for
NPDO and Hub
Schools 
Increase in RPI would result in higher
costs. 
4           100 
Roads and
Infrastructure
Services
Street Lighting Age of lighting stock requires greater
maintenance as health and safety
becomes a consideration.
4 100
Legal and
Regulatory
Support 
Licensing  Reduced numbers of licensing applications
leading to reduced income. 
4 30 
3.4 Changes to Financial Risks since last report 
3.4.1 There have been three changes to the departmental risks since the financial risks
report was presented to the Policy and Resources Committee on 11 August 2022,
as follows: 
Page 65

Page 66

- The risk in relation to Contract RPI for NPDO and Hub Schools has been
upgraded from Unlikely to Likely due to the RPI continuing to increase
greatly increasing the likelihood of additional costs.  
- The risk in relation to Licensing has increased from Possible to Likely due
to the ongoing cost of living crisis which could impact the number of
licencing applications and reduce income.
- The risk in relation to increases in Insurance Costs has been increased
from Unlikely to Possible reflecting the impact on the insurance market of
COVID-19 and flooding claims.
- The likelihood in relation to than one by-election being required outwith the
standard election cycle has been increased from Unlikely to Possible to
reflect the recent increase of by-elections.
- The likelihood and value in relation to planning fee shortfalls has been
reduced from Possible to Remote and from £0.100m to £0.050m.  This is
due to income levels currently looking positive so the risk of under-recovery
has reduced.  
3.4.2 There has been one change to the council wide risks since the financial risks
report was presented to the Policy and Resources Committee on 11 August 2022,
as follows:
- The risk of an increase in the pay award has been removed as
negotiations are at an advanced stage and the current offer is out to ballot. 
There will definitely be a pressure which will be reported within the budget
monitoring reports once it is known.  
3.5 Monitoring of Financial Risks 
3.5.1 Financial risks will be reviewed and monitored on a two monthly basis and will be
included in the pack of financial reports submitted to Policy and Resources
Committee.   
4 CONCLUSION 
4.1 This report summarises the key financial risks facing the Council.  There are a
number of Council wide risks and 42 departmental risks identified; one is
categorised as almost certain and 7 are categorised as likely.  The financial risks
are monitored routinely and actions put in place to continue to mitigate the risks.   
5 IMPLICATIONS 
5.1 Policy - None.
5.2 Financial -  The financial value of each risk is included within the
appendix.   
5.3 Legal -  None.
5.4 HR -  None.
5.5 Fairer Scotland Duty - None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty -  None.
5.5.3 Islands -  None.
Page 66

Page 67

5.6 Climate Change - None.
5.7 Risk -  Financial risks are detailed within the appendix.
5.8 Customer Service -  None. 
Kirsty Flanagan
Section 95 Officer
9 September 2022 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
APPENDICES
Appendix 1 – Detail of Department/Service financial risks 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 67

Page 68

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 31 AUGUST 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Chief Executive's
Unit
Financial Services Council Tax Debt Collection
Recovery
Recovery of debt becomes more difficult to
pursue in the current economic climate.  This is
in relation to historical debt that has
accumulated over many years therefore any
adverse collection rates will impact on the year
end debt provision as opposed to the in-year
financial position, hence no forecast variance has
been reported within the current year.
Robust monitoring of arrangements with
debt collection agency and performance
against target collection rates.
5 500 5 500
Chief Executive's
Unit
Financial Services Housing Benefit Subsidy Loss of Housing Benefit Subsidy due to exceeding
LA error threshold.
Processes in place for handling of claims
accurately and efficiently.
1 125 1 125
Chief Executive's
Unit
Financial Services Sundry Debt Recovery Recovery of debt becomes more difficult to
pursue in the current economic climate. 
Robust monitoring of arrangements with
debt collection agency. Joint working with
Legal Services to assist services with the
recovery of aged debt.
3 85 3 85
Chief Executive's
Unit
Financial Services Non-Domestic Rates Relief Risk of demand changing due to legislative
changes outwith our control or new charitable
businesses. 
Outwith direct management control. 3 30 3 30
Executive Director
Douglas Hendry
Commercial Services Property - Central Repairs Increased demands on central repairs as a result
of the decrease in capital funding available and
increases in supplier/contractor charges.
Joint strategy with procurement colleagues
to reduce potential impact of
supplier/contractor charges.  Close
monitoring of central repairs budgets and
commitments and instructing only
essential repairs.
3 300 3 300
Executive Director
Douglas Hendry
Commercial Services Catering Costs – Changes to
Food and Drink in Schools
Standards
The Scottish Government reviewed the
regulations that govern the food and drinks
currently provided in schools. The proposed
changes  were published in June 2019 and were
implemented from Easter 2021.  The revised
standards focus on reducing sugar, reducing red
and red processed meat and increasing fibre.
Thus far, there has been an increase in costs and
a reduction in demand for school meals.
There is a need to work with Education
colleagues to ensure the maximum uptake
of school meals in secondary schools is
achieved.  This is very challenging given the
reduction in secondary school meal uptake
due to COVID.
4 150 4 150
Executive Director
Douglas Hendry
Commercial Services Catering Costs - Provision of
Meals to Early Years Children
The Children and Young People (Scotland) Act
places duties on Councils to provide meals in an
Early Years setting to entitled children where
sessions span over lunch time.  The total
quantum of funding of £1.2m may not be
sufficient to fund the additional costs depending
on uptake and the additional costs to support the
meal provision in partner provider settings.
Joint strategy with Education colleagues to
implement requirements and closely
monitor financial implications.  Costs likely
to be contained within overall early years
funding allocation.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Catering Purchases Increased supplier charges.  This estimate does
not include the additional risk to food cost and
uptake from the changes to food and drink
standards in schools.
Joint strategy with procurement colleagues
to reduce potential impact.  Control food
wastage/portion controls.
4 100 4 100
As at 30 June 2022 As at 31 August 2022
Page 68

Page 69

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 31 AUGUST 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at 30 June 2022 As at 31 August 2022
Executive Director
Douglas Hendry
Commercial Services Catering - Implementation of
Universal Free School Meals in
Primary Schools
The Scottish Government may not give the local
authority adequate funds to support the policy
Catering Manager sits on National
Operational Delivery Group
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Surplus Properties Ongoing market difficulties lead to increased
numbers of surplus properties, there are residual
running costs associated with surplus properties.
One Council property team now in place. 3 50 3 50
Executive Director
Douglas Hendry
Commercial Services Leisure Service Level
Agreements
Increase in RPI resulting in requests for
additional funding.
Monitoring annual alteration to contract
RPI rate and mitigation through financial
forecasting and review of existing budget.
2 25 2 25
Executive Director
Douglas Hendry
Commercial Services Rental Income from Properties Due to current economic climate there may be
reduced ability to recover rental income from
leased properties or place suitable tenants in
properties as leases come to an end.
Management of leasehold properties by
Estates team, any issues with debt
recovery being dealt with in line with
Council debt recovery policy.
2 20 2 20
Executive Director
Douglas Hendry
Education Central Repairs Increased demands on budget as a result of
increase in statutory and emergency repairs and
increases in supplier/contractor charges.
Regular liaison with Property Services re
prioritisation and commitment of in-year
spend.
2 100 2 100
Executive Director
Douglas Hendry
Education ASN Support Demand for ASN support continues to increase,
resulting in an additional resource requirement.
The effect of COVID-19 has further increased
demand on this service.
Scottish Government has given additional
funding for "additional support needs
priority for learning" and this has been
built into the budget, this will help reduce
the demand risk 
3 100 3 100
Executive Director
Douglas Hendry
Education Pre-Five Units - retention of
partner providers
Failure in the commissioning or retention of pre-
five partner provider units to deliver 1140 hours
would result in an increased pressure on the
Council to deliver the service.
Annual financial appraisal; Support
network; Short-term cash injections.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Children and Young People
(Scotland) Act - ELC 1140
hours
The Council has been required to deliver 1140
hours of Early Learning and Childcare since
August 2021.  The Scottish Government has
committed to funding this and the Council has
altered the implementation plan to align it to the
Scottish Government funding profile.  A risk
remains that actual costs of delivery exceed the
Government Grant in any given year.  For
example, if child numbers are higher than
estimated, this may require additional staffing
which has not been built into the staffing model
funded by Scottish Government.
Continuous monitoring and review of the
implementation plan, usage and resources.
3 100 3 100
Page 69

Page 70

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 31 AUGUST 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at 30 June 2022 As at 31 August 2022
Executive Director
Douglas Hendry
Education Legislative Requirements -
Education (Scotland) Act
Education (Scotland) Act 2000 was enacted
March 2016.  This places additional requirements
on Councils to carry out assessments of the need
for the provision of Gaelic Medium Primary
Education (GMPE) and the duty to support and
promote Gaelic Education. May lead to
additional staffing requirements.
Monitoring developments of the
implementation of the Act and statutory
guidance produced and adhered too.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Hub DBDA/DBFM Schools  -
Litigation
Increased risk of the requirement to litigate to
conclude final capital contract payments due.
Monitoring claims and mitigation through
robust challenge of any additional claims.
2 150 2 150
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Contract RPI for NPDO and
Hub Schools
Increase in RPI would result in higher costs. Monitoring annual alteration to contract
RPI rate and mitigation through financial
forecasting and review of existing budget.
2 100 4 100
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO - Reduction in insurance
savings within NPDO Schools
Increase in insurance costs as a result of Covid-
19 and flood claims.
Monitoring annual alteration to contract
insurance rate and mitigation through
financial forecasting and review of existing
budget.
2 75 3 75
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services - Litigation Increased number of litigation cases. Ensure Legal Services are gateway to
access all legal advice and that advice is
sought at earliest opportunity.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO/Hub DBFM contract
management efficiencies
Reduction in ability to generate contract
management efficiencies.
Monitoring annual efficiencies generated
and mitigation through robust contract
management and application of contract
specifications/requirements.
2 50 2 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Elections More than 1 by-election required outwith
standard election cycle.
Outwith direct management control. 2 45 3 45
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Licensing Reduced numbers of licensing applications
leading to reduced income.
Monitoring of trends and reporting the
financial impact in the budget monitoring.
3 30 4 30
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Children's Panel Increased number of referrals increasing costs
through increases in the running costs.
Maximise the use of council
facilities/resources for panel session in the
first instance.
1 10 1 10
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services Failure to minimise Council wide use of external
legal advice.
Ensure legal services are gateway to access
all legal advice.
1 10 1 10
Executive Director
Kirsty Flanagan
Customer Support Services Software Licences Potential risk of being under licensed for
software which will be identified via software
audits which would incur additional costs.
ICT security and compliance officer in post
and duties include review of systems to
ensure fully licenced. 
2 100 2 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Environmental Health- export
certificates
Downturn in requests for export certificates as a
result of UK withdrawal from EU, changes to
international trading agreements or business
economy. Reduction in demand creates a budget
pressure on environmental health budget.
Monitor income and resources required for
export health certificates/attestations
required to support the export market.
Continue with food safety regulation
activities associated and support at 3rd
country audits.  Pursue debt rigorously
with key customers through seeking
regular payments.
2 130 2 130
Page 70

Page 71

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 31 AUGUST 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at 30 June 2022 As at 31 August 2022
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Dangerous Buildings
interventions
Building Standards having to deal with an
increasing level of dangerous building work
which has significant financial implications for
Council.
Monitor activity and seek to recover costs
from the owner.
3 100 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fees reduced by
Scottish Government
Scottish Government reducing planning fees due
to poor performance by the Planning Authority. 
Details of national Planning Performance Co-
ordinator and Fee Reform still awaited.
Maintain high levels of performance as
articulated by performance markers
detailed in Planning Performance
Framework annual report.
1 100 1 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fee shortfalls Due to downturn in economic / building activity,
in particular renewable energy development and
other major developments could lead to planning
fee income shortfalls leading to revenue budget
pressures.
Current income levels are looking more
positive, however, we are dependent on
some high value applications coming in
which if don't materialise, will impact the
overall position.  Will continue to monitor
Development Management income and
expenditure tightly and investigate further
income generation streams.
3 100 1 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Building Warrant fee shortfalls Due to loss of commercial income and downturn
in economic / building activity, building warrant
fee income shortfalls leading to revenue budget
pressures.
Continue to monitor Building Standards
income and expenditure tightly and
investigate further income generation
streams. 
3 100 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Homelessness Temporary
Accommodation Income
Unpredictable number of Homeless applications.
Inability to recover rent.  Increase costs of
property maintenance and tenancy change over.
Provision of Housing Options information
and advice service to minimise number of
applicants proceeding to full homeless
application.  Implementation of Rapid
Rehousing Plan.
3 50 3 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Animal Health Carrying out livestock seizure to protect welfare
of the animals
Monitor activity and seek to recover costs
from the disposal of the animals.
1 10 1 10
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Airfields and Air Services -
usage
The PSO for the existing air service to Coll and
Colonsay operating from Connel Airport is due
for renewal in October 2023.  Possibility that this
will create a budget pressure for a new contract
to be established to serve the needs of the island
communities.
Tenders have been received and are
currently at the evaluation process with
Procurement.  Once this process is
complete, a more definitive position will be
known.
2 10 2 10
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Roads Maintenance - Bridges,
Culverts & Sea Defences
Extreme localised weather may result in loss of
bridge, culvert, road or sea defence.
The recent storm damage to Bute Sea Wall is
likely to cost in excess of £1m to repair so the
value on this risk has been updated for 22-23 in
recognition of the potential costs associated with
this risk
Routine inspections to deal with potential
weak areas - based on a stitch in time
repair regime.
3 750 3 750
Page 71

Page 72

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 31 AUGUST 2022
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at 30 June 2022 As at 31 August 2022
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Residual Waste H&L and Tiree There is a potential increase to tipping fees and
haulage costs for H&L residual waste.  The
Council’s supplier Barr Environmental (contract
to end of 2023) lost a tribunal relating to the
underpayment of landfill tax, which may have led
to the Council having to source alternatives at a
higher cost.    Barr appealed the decision which
was heard in the Spring and they won the case
which should have reduced or eliminated this
financial risk.  However, the Scottish
Government laid an Amendment Order on Friday
1 July 2022 which came into force at 1700 on 1
July which indicates that Landfill tax will be due
on materials previously not chargeable and we
have now received notification of an increase in
the cost which officers are currently assessing
Officers currently assessing the potential
impact on the Council.
4 655 4 655
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Roads Materials - Bitumen Increased cost of asphalt material due to price of
crude oil rising.  Discussions emerging from the
industry about possible rationing of bitumen
which, if applied, will affect our programmes due
to availability
Increased costs are currently being
managed but with further increases likely,
this is being closely monitored by
managers to evaluate the impact.
4 400 4 400
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Winter Maintenance Adverse weather conditions which require
greater than budgeted number of gritting runs.
Monitor weather conditions and apply
gritting policy to minimise costs.
3 365 3 365
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Roads Maintenance - Roads
Network
Adverse weather conditions result in
deterioration of the road network necessitating
greater spend on repair of defects.
Manage maintenance budgets to ensure
that spend is prioritised to deal with safety
defects.
3 230 3 230
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Street Lighting Age of lighting stock requires greater
maintenance as health and safety becomes a
consideration.
Manage maintenance budgets to ensure
that spend is prioritised to deal with safety
defects.
4 100 4 100
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Ferry Services - income Changes to ferry services resulting in reduced
passenger income.
Closely monitor passenger number
information coming from CalMac to
identify any emerging trends with reducing
passenger numbers.
3 40 3 40
42 5,795 42 5,745
Page 72

Page 73

ARGYLL  AND BUTE COUNCIL  POLICY & RESOURCES COMMITTEE  
FINANCIAL SERVICES 13 OCTOBER 2022 
CAPITAL BUDGET MONITORING REPORT – 31 AUGUST 2022 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides an update on the position of the capital budget as at 31
August 2022. The report provides information on the financial position in respect
of the capital plan and also the performance in terms of delivery of capital plan
projects. 
1.2  Financial Position: 
 Current Year to Date – actual net expenditure to date is £10,954k
compared to a budget for the year to date of £10,857k giving rise to an
overspend for the year to date of £97k (0.9%).
 Forecast Outturn for 2022-23 – forecast net expenditure for the full
financial year is £47,714k compared to an annual budget of £48,260k
giving rise to a forecast underspend for the year of £546k (1.13%).    
 Total Capital Plan – forecast total net project costs on the total capital
plan are £178,745k compared to a total budget for all projects of
£178,526k giving rise to a forecast overspend for the overall capital plan
of £219k (0.12%). 
1.3 Project Delivery: 
 Asset Sustainability – Out of 92 projects there are 88 projects (96%) on
track, 4 projects (4%) off track but recoverable and 0 projects off track
(0%).
 Service Development - Out of 41 projects there are 34 projects (83%) on
track, 6 projects (15%) off track but recoverable and 1 project (2%) off
track.
 Strategic Change – Out of 27 projects there are 25 projects (93%) on
track, 1 project (4%) off track but recoverable and 1 project (4%) off track.  
1.4 
1.5 
The Capital Programme is funded by various income streams as detailed in
Appendix 5. Additional funding allocated since the last report has come from
earmarked reserves for Gartbreck Landfill Site. 
The Council is projecting £1,387k of capital receipts this financial year. To date,
no receipts have been received and we are anticipating that we will not receive
the full amount budgeted for 2022-23, however, this appears to be a delay rather
than a permanent reduction and over the life of the entire capital programme
there is no overall impact.  This will be closely monitored throughout the year. 
Page 73

Page 74

ARGYLL  AND BUTE COUNCIL  POLICY & RESOURCES COMMITTEE  
FINANCIAL SERVICES 13 OCTOBER 2022 
CAPITAL BUDGET MONITORING REPORT – 31 AUGUST 2022 
2.0  INTRODUCTION 
2.1 
2.2 
2.3 
2.4 
2.5 
This report provides an update on the position of the capital budget as at 31
August 2022. The report provides information on the financial position in respect of
the capital plan and also the performance in terms of delivery of capital plan
projects. 
Following the decision at Policy and Resources Committee on 9 December 2021,
the Rothesay Pavilion project is on pause whilst potential funding options are being
considered. The financial information included within this report therefore excludes
amounts relating to Rothesay Pavilion.   
A £1m cost pressure was identified during 2021-22 in relation to repairs to the
A884 Ardbeg Sea Wall, where severe storm damage resulted in failure of the sea
wall on Bute. Emergency works were carried out and a permanent solution is
currently being developed. Additional funding of £1m was allocated for this
purpose at the Council meeting on 24 February 2022 however there remains a risk
that costs will exceed this. It was agreed at Environment, Development and
Infrastructure Committee on 2 June 2022 that the Chair would approach the
Scottish Government with a view to securing additional resources to support the
scheme. 
Project Managers were asked to identify specific Covid-19 impacts on the capital
programme. At the budget meeting on 25 February 2021, the Council agreed to
provide £2.5m of funding and following agreement at the Policy and Resources
Committee on 14 October 2021, this, plus a further £0.146m, was added to the
capital programme. 
Furthermore, at the budget meeting on 24 February 2022, an additional £3.9m was
set aside for future capital contract increases. This includes up to £1.2m for
Campbeltown Flood Scheme, the final costs of which are estimated to be
£15.215m. The Scottish Government will fund 80% of scheme costs with the
Council expected to contribute an estimated £3.043m. 
The impact of the pandemic along with the UK exit from the European Union, the
Russian invasion of Ukraine and sanctions on Russian owned entities has seen
significant price increases as well as disruptions to the supply chain and longer
lead in times. The increased rate of inflation impacts costs such as energy prices,
labour, packaging and transport. These all have an effect on the overall contract
price and make it extremely challenging to manage expenditure and the availability
of supply. 
As a result of this it should be noted that there are likely to be other significant
financial impacts which are not quantifiable at this stage, as follows: 
 Rothesay Pavilion – project currently paused due to increased costs as a
result of the main contractor being placed into administration in March 2020. 
Page 74

Page 75

4.0 CURRENT YEAR TO DATE FINANCIAL POSITION 
4.1 
4.2
Overall Position 
Actual net expenditure to date is £10,954k compared to a budget for the year to
date of £10,857k giving rise to an overspend for the year to date of £97k (0.9%). 
Project/Department Position 
The table below shows the year to date net expenditure against the year to date
budget by project type and service: 
Project Type:
Year to
Date
Budget    
£'000
Year to
Date
Actual    
£'000
Variance       
£'000
Asset Sustainability 6,284 6,392 (108)
Service Development 1,240 1,225 15
Strategic Change 3,333 3,337 (4)
Total  10,857 10,954 (97)
Service:      
ICT 569 569 0
Education 2,296 2,258 38
Live Argyll 82 141 (59)
Health & Social Care Partnership 75 124 (49)
Shared Offices 44 44 0
Roads & Infrastructure 4,427 4,450 (23)
Development & Economic Growth 577 577 0
CHORD 2,787 2,791 (4)
Total 10,857 10,954 (97) 
Material variances are explained in Appendix 1 and there are a number of small
variances contributing to the year to date overspend. 
 Harbour Investment Programme – likely to be contractual cost increases in
future years (expected to be funded from increased fees and charges).
 Helensburgh Waterfront Development – commercial negotiations are
ongoing with the main contractor to determine the financial impact.  
 Universal Free School Meals – delayed roll out to P6 and P7 and uncertain
capital funding levels available from Scottish Government (delay not
mentioned as part of Resource Spending Review). 
 Other general construction inflationary increases.
3.0 RECOMMENDATIONS 
3.1 Note the contents of this report and the financial summaries as detailed in
Appendix 8 and approve the proposed changes to the capital plan detailed in
Appendix 4. 
Page 75

Page 76

5.0  FORECAST OUTTURN 2022-23 
5.1  Overall Position 
Forecast net expenditure for the full financial year is £47,714k compared to an annual
budget of £48,260k giving rise to a forecast underspend for the year of £546k (1.13%). 
5.2 Project/Department Position 
The table below shows the forecast expenditure and budget for the year by project
type and service. 
Project Type:
Annual
Budget            
£'000
Forecast
Outturn        
£'000 
Forecast
Variance 
COVID-
19
Related       
£'000
Forecast
Variance 
Non
COVID-
19
Related       
£'000
Forecast
Variance         
£'000
Asset Sustainability 27,240 27,376 0 (136) (136)
Service Development 4,848 4,700 0 148 148
Strategic Change 16,172 15,638 0 534 534
Total  48,260 47,714 0 546 546
Service:          
ICT 1,367 1,367 0 0 0
Education 6,097 6,135 0 (38) (38)
Live Argyll 1,208 1,280 0 (72) (72)
Health & Social Care
Partnership 2,107 2,158 0 (51) (51)
Shared Offices 4,197 4,213 0 (16) (16)
Roads & Infrastructure 26,595 26,631 0 (36) (36)
Development &
Economic Growth 2,770 2,011 0 759 759
CHORD 3,919 3,919 0 0 0
Total 48,260 47,714 0 546 546 
Material variances are explained in Appendix 2 and there are a number of smaller
variances contributing to the forecast overspend. 
Page 76

Page 77

6.0  TOTAL PROJECT COSTS 
6.1 Overall Position 
Forecast total net project costs on the total capital plan are £178,745k compared to
a total budget for all projects of £178,526k giving rise to a forecast overspend for
the overall capital plan of £219k (0.12%). 
6.2  Project/Department Position 
The table below shows the forecast expenditure and budget for the total capital
plan by project type and service. 
Project Type:
Capital
Plan
Budget           
£'000
Forecast
Project
Costs        
£'000 
Capital
Plan
Variance 
COVID-19
Related       
£'000
Capital
Plan
Variance 
Non
COVID-19
Related       
£'000
Total
Capital
Plan
Variance         
£'000
Asset Sustainability 51,084 51,225 0 (141) (141)
Service Development 19,337 19,399 0 (62) (62)
Strategic Change 108,105 108,121 0 (16) (16)
Total  178,526 178,745 0 (219) (219)
Service:          
ICT 5,007 5,007 0 0 0
Education 41,833 41,871 0 (38) (38)
Live Argyll 3,368 3,445 0 (77) (77)
Health & Social Care
Partnership 4,222 4,273 0 (51) (51)
Shared Offices 21,507 21,523 0 (16) (16)
Roads &
Infrastructure 54,017 54,053 0 (36) (36)
Development &
Economic Growth 4,734 4,735 0 (1) (1)
CHORD 43,838 43,838 0 0 0
Total 178,526 178,745 0 (219) (219) 
Material variances are explained in Appendix 3 and there are a number of
smaller variances leading to the forecast overspend. 
Page 77

Page 78

7.0  TOTAL PROJECT PERFORMANCE 
7.1 Overall Position 
There are 160 projects within the Capital Plan, 147 are Complete or On Target, 11
are Off Target and Recoverable and 2 are Off Track.
7.2  Project Position 
The table below shows the Performance Status of the Projects in the Capital Plan. 
Project Type:
Complete
/ On
Target
Off Target/
Recoverable
Off
Target/
Problem Total
Asset Sustainability 88 4 0 92
Service Development 34 6 1 41
Strategic Change 25 1 1 27
Total 147 11 2 160
Service:        
ICT 7 0 0 7
Education 29 1 0 30
Live Argyll 25 3 0 28
Health & Social Care
Partnership 16 2 0 18
Shared Offices 21 0 0 21
Roads & Infrastructure 31 4 0 35
Development &
Economic Growth 14 0 2 16
CHORD 4 1 0 5
Total 147 11 2 160 
Page 78

Page 79

7.3  Chart of Performance Status 
The graph provides a view of the Performance Status of the Projects included  in
the Capital Plan: 
0
10
20
30
40
50
60
70
80
90
100
Asset Sustainability Service Development Strategic Change
Number
Off Target/
Problem
Off Target/
Recoverable
Complete/ On
Target
Page 79

Page 80

8.0 OFF TRACK PROJECTS 
8.1 
9.0 
9.1 
The Off Track projects are noted in the table below and variance reports are
included in Appendix 6. 
Project
Type
Project What is Off
Track?
Explanation
Service
Development 
Ardrishaig North
Active Travel
Current Year
Expenditure
Contract awarded
later than expected
due to delays in
receiving required
documentation and
delay in contractor to
deploy on site
resulting in a delay to
expenditure profile. 
Expenditure has
slipped from 2022-23
into 2023-24. 
Service
Development
TIF - Halfway House
Roundabout
Current Year
Expenditure
Delays with Planning
Applications and
ongoing discussions
with Scottish
Government have
resulted in delays in
progressing the
project and
expenditure. 
Expenditure has
slipped from 2022-23
into 2023-24. 
STRATEGIC CHANGE PROJECTS 
Appendix 7 gives detailed information in respect of the Strategic Change
Projects within the Capital Plan. The appendix gives details of the forecast cost
of each project against the approved budget, the start and anticipated
completion date of the project and an assessment of the risks of the project and,
if these are not green, gives an explanation of the problem. 
Page 80

Page 81

10.0  CHANGES TO CAPITAL PLAN 
10.1  The table below shows proposed changes to the Capital Plan at summary level
which include slippages, accelerations and virements. Explanations relating to
the specific projects involved can be seen in Appendix 4. 
The updated capital plan incorporating these proposed changes can be found in
Appendix 9. 
Department
Prev.
Agreed
Changes 
2022-23
2022-
23
2023-
24
2024-
25
Future
Years
Total
Capital
Plan
£’000 £’000 £’000 £’000 £’000 £’000
Asset
Sustainability 73 0 0 0 0 0
Service
Development (151) (210) 210 0 0 0
Strategic
Change (19,370) (550) 550 0 0 0
Total (19,448) (760) 760 0 0 0              
Service:            
ICT (151) 0 0 0 0 0
Education 0 0 0 0 0 0
Live Argyll (27) 0 0 0 0 0
Health & Social
Care
Partnership
0 0 0 0 0 0
Shared Offices 100 0 0 0 0 0
Roads &
Infrastructure (19,370) 0 0 0 0 0
Development &
Economic
Growth
0 (760) 760 0 0 0
Major Projects 0 0 0 0 0 0
Total (19,448) (760) 760 0 0 0 
11.0          FUNDING 
11.1 
11.2 
The Capital Programme is funded by various income streams as detailed in
Appendix 5. Additional funding allocated since the last report has come from
earmarked reserves for Gartbreck Landfill Site. 
The Council is projecting £1,387k of capital receipts this financial year. At this
early stage in the year no receipts have been received but this will be closely
monitored throughout the year and any issues highlighted. 
Page 81

Page 82

12.0 
12.1 
12.2 
12.3 
12.4 
12.5 
12.6 
12.7 
12.8 
IMPLICATIONS 
Policy – Monitors progress against the capital plan. 
Financial – Monitors funding and commitments of the capital plan. 
Legal – Available funding may not address all Statutory and Regulatory
requirements in relation to Health and Safety. 
HR – Available funding may have an impact on the sustainability of the Property
Design Team and Infrastructure Design Team. 
Fairer Scotland Duty – None. 
12.5.1     Equalities – protected characteristics – None. 
12.5.2     Socio-economic Duty – None. 
12.5.3     Islands – None. 
Climate Change – The Council is committed to addressing climate change via
projects within the capital plan. 
Risk – There are risks around increasing capital contract costs and the level and
timing of capital receipts. 
Customer Service – None. 
Kirsty Flanagan 
Executive Director / Section 95 Officer 
4 October 2022                                                  
Policy Lead for Finance and Commercial Services – Councillor Gary
Mulvaney 
For further information contact: Anne Blue, Head of Financial Services 
APPENDICES 
- Appendix 1 – Year To Date finance variance explanations
- Appendix 2 – Forecast Outturn variance explanations
- Appendix 3 – Total Project finance variance explanations
- Appendix 4 – Changes to Capital Plan and Financial Impact
- Appendix 5 – Capital Funding
- Appendix 6  - Off Track project variance reports
- Appendix 7 - Cumulative spend, completion dates and risks relating                         
to significant capital projects. 
- Appendix 8 - Financial Summary – Overall
- Financial Summary – Executive Director Kirsty Flanagan
- Financial Summary – Executive Director Douglas Hendry
- Appendix 9 - Updated/Revised Capital Plan 
Page 82

Page 83

APPENDIX 1 – Year to Date Financial Variance Explanations
Listed below are the projects where the variance is +/- £50k.
Project
YTD
Budget
£’000
YTD
Actual
£’000
(Over)/
Under
Variance       
£’000
Explanation    
No variances +/-£50k for this report.
Other variances under £50k   (97) Total value of non-material variances less than +/-£50k
Total   (97) 
Page 83

Page 84

APPENDIX 2 – Outturn Variance Explanations
Listed below are the projects where the current year variance is +/- £50k. 
Project 
Annual
Budget
£’000
Outturn
£’000 
(Over)/ Under
Forecast
Variance
COVID-19
Related         
£’000
(Over)/ Under
Forecast
Variance Non
COVID-19
Related         
£’000
Total
(Over)/
Under
Forecast
Variance         
£’000
Explanation
Ardrishaig North Active Travel 880 670                0 210 210
Contract awarded later than expected due to
delays in receiving required documentation and
delay in contractor to deploy on site resulting in a
delay to expenditure profile.  Expenditure has
slipped from 2022-23 into 2023-24
TIF - Halfway House
Roundabout 597 47               0 550 550
Delays with Planning Applications and ongoing
discussions with Scottish Government have
resulted in delays in progressing the project and
expenditure.  Expenditure has slipped from 2022-
23 into 2023-24
Other variances under £50k                  0 (214) (214) Total value of non-material variances less than +/-
£50k.
Total  0 546 546 
Page 84

Page 85

APPENDIX 3 – Total Project Finance Variances
Listed below are the projects where the total project variance is +/- £50k. 
Project 
Capital
Plan
Budget
£’000
Forecast
Project
Costs
£’000 
(Over)/ Under
Forecast
Variance
COVID-19
Related         
£’000
(Over)/ Under
Forecast
Variance Non
COVID-19
Related         
£’000
Total (Over)/
Under
Forecast
Variance         
£’000
Explanation       
No variances +/-£50k for this report.
Other variances under £50k             (219) (219) Total value of non-material variances less than +/-
£50k. Project Managers are working to reduce these
small individual overspends by identifying
underspends elsewhere within the capital plan.
Total  (219) (219) 
Page 85

Page 86

APPENDIX 4 – Changes to Capital Plan and Financial Impact
OVERALL COST CHANGES
Project
2022-
23
£’000
2023-
24
£’000
2024-
25
£’000
Future
Years
£’000
Total
Capital Plan
£’000
Recommendation Explanation      
No overall cost changes this reporting period.
Total Cost Changes 0 0 0 0 0   
SLIPPAGES AND ACCELERATIONS
Project 2022-23
£’000
2023-24
£’000
2024-25
£’000
Future
Years
£’000 
2022-23
Slippage
Related to
COVID-19
£’000
2022-23
Slippage
Related
to Non
COVID-19
£’000
Total
2022-
23 
£’000
Recommendation Explanation
Ardrishaig North
Active Travel (210) 210 0 0  0 (210) (210) Slip budget into
future years.
Contract awarded later than
expected due to delays in
receiving required
documentation and delay in
contractor to deploy on site
resulting in a delay to
expenditure profile. 
Expenditure has slipped from
2022-23 into 2023-24
TIF - Halfway
House Roundabout (550) 550 0 0  0 (550) (550) Slip budget into
future years.
Delays with Planning
Applications and ongoing
discussions with Scottish
Government have resulted in
delays in progressing the
project and expenditure. 
Expenditure has slipped from
2022-23 into 2023-24
Total Slippages
and Accelerations
(760) 760 0 0  0 (760) (760)  
Net Impact of
Changes
(760) 760 0 0  0 (760) (760)   
Page 86

Page 87

CAPITAL PROGRAMME FUNDING Appendix 5
Estimated
Capital
Funding
Carry
Forwards
from 21-22
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
Estimated
Capital
Funding
Carry
Forwards
from 21-22
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
Estimated
Capital
Funding
Carry
Forwards
from 21-22
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
General Capital Grant 9,569 0 0 0 9,569 9,569 0 0 0 9,569 9,569 0 0 0 9,569
Transfer to Revenue for Private Sector Housing Grant (PSHG) -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033
Capital Receipts 1,387 0 0 0 1,387 1,095 0 0 0 1,095 0 0 0 0 0
Flooding Allocation 155 0 0 0 155 155 0 0 0 155 155 0 0 0 155
Ring Fenced Capital Grant 4,656 2,722 0 268 7,646 0 5,728 0 0 5,728 0 0 0 0 0
Restricted Funding 1,486 609 -210 1,714 3,599 1,150 0 210 0 1,360 0 0 0 0 0
Funded by Reserves 3,145 4,388 -1,256 1,146 7,423 36 172 -75 0 133 0 0 1,331 0 1,331
Additional Funding from Revenue 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Insurance 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Harbour Investment Programme 31,180 2,484 -18,114 0 15,550 16,900 0 6,125 0 23,025 31,600 0 -3,400 0 28,200
Prudential Borrowing 15,528 3,352 -628 0 18,252 5,006 -1,429 628 0 4,205 27 0 0 0 27
Loans Fund Review 0 4,025 0 0 4,025 0 0 0 0 0 0 0 0 0 0
COVID Funding 1,640 2,167 0 0 3,807 0 0 0 0 0 0 0 0 0 0
67,713 19,747 -20,208 3,128 70,380 32,878 4,471 6,888 0 44,237 40,318 0 -2,069 0 38,249
BREAKDOWN OF ADDITIONAL FUNDING
Additional Funding 2022-23 2023-24 Reported
C'town Museum LA income 40 Live Argyll Jun-22
H&L/Rosneath Cycleways 140 Jun-22
Nature Restoration Fund 238 Jun-22
Rothesay Pontoons 315 Grant Funding Jun-22
Ardrishaig North 280 Grant Funding Jun-22
Lismore Ferry 7 External Income Jun-22
Lochgilphead PS Demolition 11 Reserves Jun-22
Fleet Management 499 Reserves Jul-22
Roads Reconstruction 958 STTS Jul-22
Gartrecfk Landfill 640 Reserves Aug-22
Total 3,128 0
2022-23
SPT
Scottish Government
2024-252023-24
Source
Page 87

Page 88

OFF TRACK PROJECT Appendix 6
Project Name:  Ardrishaig North Public Realm Project Manager:  Anna Watkiss Risk:  Low
Initial Start Date:  Design work commenced 2018/19, contract award
21/6/2022
Proposed End Date:  April 2023
How was this project initially funded?  Tarbert and Lochgilphead
Regeneration Fund
Please detail any additional funding.  Green Infrastructure Fund, Crown Estate
Scotland, HiTrans
Previously Reported Committee and Date:  Next Reported Committee and Date:
Why is the project classified as off target? 
Levels of expenditure have not been as expected and fall outside the tolerances, the project is now expected to be ongoing into 2023/24 financial year.
What has caused the issue outlined above?
The contract was awarded later than expected (21 June 2022 rather than the early May) due to delays in receiving required documentation and the
contractor has taken longer to deploy to site than anticipated. This has all impacted the expected timescales for spend. We expect that this will change again
as we are awaiting a spend profile from the contractor in terms of their anticipated billing of costs.
What action will be taken to rectify this issue? 
Timescales for the project will be monitored and cost profiles adjusted in order to ensure that they are as accurate as possible.
What are the implications of the action proposed?
None anticipated
Page 88

Page 89

OFF TRACK PROJECT  Appendix 6
Project Name:  TiF Halfway House Roundabout Project Manager:  Adrian Jackson-Stark Risk:  Low
Initial Start Date:  2022 Proposed End Date:  2024
How was this project initially funded?  TiF Prudential Borrowing Please detail any additional funding.  n/a
Previously Reported Committee and Date:   Next Reported Committee and Date: 
Why is the project classified as off target? 
Levels of expenditure have not been as expected and fall outside the tolerances, the project is now expected to commence in 2023/24 financial year. 
What has caused the issue outlined above?  
Delays with Planning Applications and ongoing discussions with Scottish Government have resulted in delays in progressing the project and expenditure. 
Studies are currently underway to determine scope of works in order to progress as soon as discussions have been finalised. 
What action will be taken to rectify this issue? 
Timescales for the project will be monitored closely and updated as discussions and studies progress. 
What are the implications of the action proposed? 
Budget slipped from 2022-23 in to 2023-24. 
Page 89

Page 90

Strategic Change Projects - Cumulative Spend, Start/Finish Dates and Project Risks APPENDIX 7
Strategic Change Projects
Prior Years
Spend
£'000
Current Year
Forecast
£'000
Total Project
Forecast
£'000
Total Project
Budget
£'000
Project Start
Date
Estimated
Completion
Date
Project
Risks
Identified Explanation
TIF - Halfway House Roundabout 0 47 640 640 tbc tbc Red Delays due to discussions with Scottish Government and Planning Consents delays.
CHORD Oban 7,129 651 7,905 7,905 27/10/2016 31/03/2022 Amber Issues with contract close out impacting on timescales.
Harbour Investment Programme 1,802 15,550 91,292 91,292 01/04/2017 31/03/2028 Green
Campbeltown Flood Scheme 181 9,098 15,215 15,215 01/08/2016 31/03/2023 Green
Dunoon Primary 7,170 304 10,869 10,869 18/12/2014 30/04/2020 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Kirn Primary School 9,878 99 10,119 10,119 24/04/2014 31/10/2017 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Replacement of Oban High 2,496 136 3,250 3,250 24/04/2014 31/01/2019 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Street Lighting LED Replacement 2,700 791 3,900 3,900 01/08/2016 31/12/2022 Green Tender for final package of works still to be awarded.
Helensburgh Office Rationalisation 11,500 310 11,838 11,838 25/04/2013 31/12/2022 Green Project subject to legal dispute.
CHORD Dunoon 12,238 55 12,522 12,522 03/02/2012 09/03/2018 Green
Main contract complete and retentions paid. Landscaping and remediation works ongoing but
issues with water ingress may require works in 22-23.
Helensburgh Waterfront Development 1,387 2,895 22,557 22,557 01/04/2017 31/03/2024 Green Additional funding awarded resulting in increased budget. Budget to be reprofiled.
Kilmory Business Park Phase 2AA 0 141 150 150 01/02/2022 01/09/2023 Green Development Agreement still to be concluded.
Carbon Management Business Cases 201 60 261 261 01/02/2014 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Carbon Management - Group Heating Conversion Project 1,938 10 1,948 1,948 01/02/2016 31/12/2022 Green Complete.
Carbon Management - Non Education 14 21 50 50 01/04/2015 31/12/2022 Green Projects being determined.
NPDO Schools Solar PV Panel Installations 761 183 944 944 26/06/2014 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Non NPDO Schools Solar PV Panel Installations 400 88 488 488 20/03/2014 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Carbon Management Capital Property Works 2016/17 19 20 39 39 01/02/2016 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Oil to Gas Heating Conversions 182 5 187 187 01/02/2012 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Dunoon Pier OBC 2,844 0 2,844 2,844 03/02/2012 26/02/2016 Green Project complete.
Campbeltown Office Rationalisation 595 1 596 596 01/02/2015 31/03/2019 Green Complete.
TIF - Oban Airport Business Park 447 101 590 590 22/01/2015 31/12/2022 Green
Campbeltown Schools Redevelopment 1,649 76 2,130 2,130 16/02/2012 30/11/2018 Green Physically complete - negotiations with contractor delaying payment of financial sums outstanding.
CHORD - Helensburgh 6,483 28 6,557 6,557 29/09/2011 30/04/2015 Green Main contract complete. Art project originally proposed for 21-22 now slipped into 22-23.
TIF - North Pier Extension 214 0 214 214 06/12/2017 06/12/2021 Green Complete.
TIF - Lorn/Kirk Road 1,959 1 2,170 2,170 22/01/2015 31/03/2021 Green Complete.
Carbon Management Fuel Conversions 107 0 107 107 01/02/2014 31/03/2019 Green Complete.
Kilmory Biomass  Carbon Management 956 0 956 956 20/09/2012 31/03/2019 Green Complete.
Strategic Change Total 75,250 30,671 210,338 210,338
Project Risk Classifications:
Green - Risks can be managed and are viewed as stable or reducing.
Amber - Risks are increasing but are still manageable.
Red - Risks are increasing or have increased to such an extent they may affect delivery of the project.
Capital Expenditure Dates Risks
Page 90

Page 91

ARGYLL AND BUTE COUNCIL - CAPITAL PLAN MONITORING REPORT - OVERALL COUNCIL
FINANCIAL SUMMARY - NET EXPENDITURE
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Executive Director Douglas Hendry 1,464 1,572 (108) 10,003 10,139 (136) 19,032 19,173 (141)
Executive Director Kirsty Flanagan 4,820 4,820 0 19,627 19,627 0 34,442 34,442 0
Asset Sustainability Total 6,284 6,392 (108) 29,630 29,766 (136) 53,474 53,615 (141)
Service Development Projects
Executive Director Douglas Hendry 567 567 0 1,242 1,267 (25) 15,144 15,169 (25)
Executive Director Kirsty Flanagan 742 765 (23) 7,652 7,479 173 33,099 33,136 (37)
Service Development Total 1,309 1,332 (23) 8,894 8,746 148 48,243 48,305 (62)
Strategic Change Projects
Campbeltown Schools Redevelopment 38 38 0 76 76 0 2,130 2,130 0
Dunoon Primary 257 257 0 304 304 0 10,869 10,869 0
Replacement of Oban High 96 96 0 136 136 0 3,250 3,250 0
Kirn Primary School 65 65 0 99 99 0 10,119 10,119 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Carbon Management Business Cases 0 0 0 60 60 0 261 261 0
NPDO Schools Solar PV Panel Installations 0 0 0 183 183 0 944 944 0
Non NPDO Schools Solar PV Panel Installations 0 0 0 88 88 0 488 488 0
Carbon Management Fuel Conversions 0 0 0 0 0 0 107 107 0
Carbon Management Capital Property Works 2016/17 0 0 0 20 20 0 39 39 0
Carbon Management - Group Heating Conversion Project 0 0 0 10 10 0 1,948 1,948 0
Kilmory Biomass  Carbon Management 0 0 0 0 0 0 956 956 0
Oil to Gas Heating Conversions 0 0 0 5 5 0 187 187 0
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 10 10 0 310 310 0 11,838 11,838 0
Clean Energy 0 0 0 551 567 (16) 729 745 (16)
Clean Energy 2022-23 0 0 0 500 500 0 500 500 0
Campbeltown Flood Scheme 31 31 0 9,098 9,098 0 15,215 15,215 0
Street Lighting LED Replacement 49 49 0 791 791 0 3,900 3,900 0
Harbour Investment Programme 186 186 0 15,550 15,550 0 91,292 91,292 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - North Pier Extension 0 0 0 0 0 0 214 214 0
TIF - Oban Airport Business Park 0 0 0 101 101 0 590 590 0
TIF - Halfway House Roundabout 0 0 0 597 47 550 640 640 0
CHORD - Helensburgh 0 0 0 28 28 0 6,557 6,557 0
CHORD Dunoon 4 4 0 55 55 0 12,522 12,522 0
CHORD Oban 0 0 0 651 651 0 7,905 7,905 0
Helensburgh Waterfront Development 2,760 2,760 0 2,895 2,895 0 22,557 22,557 0
HWD - FFE (Funded by LA) 5 5 0 344 344 0 350 350 0
Kilmory Business Park Phase 2AA 18 18 0 141 141 0 150 150 0
Dunoon Pier OBC 0 0 0 0 0 0 2,844 2,844 0
Strategic Change Total 3,519 3,519 0 32,616 32,082 534 211,917 211,933 (16)
Total Expenditure 11,112 11,243 (131) 71,140 70,594 546 313,634 313,853 (219)
INCOME 71,140 70,594
Asset Sustainability
Executive Director Douglas Hendry 0 0 0 0 0 0 0 0 0
Executive Director Kirsty Flanagan 0 0 0 (2,390) (2,390) 0 (2,390) (2,390) 0
Asset Sustainability Total 0 0 0 (2,390) (2,390) 0 (2,390) (2,390) 0
Service Development Projects
Executive Director Douglas Hendry 0 (38) 38 0 0 0 (7,771) (7,771) 0
Executive Director Kirsty Flanagan (69) (69) 0 (4,046) (4,046) 0 (21,135) (21,135) 0
Service Development Total (69) (107) 38 (4,046) (4,046) 0 (28,906) (28,906) 0
Strategic Change Projects
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary 0 0 0 0 0 0 (137) (137) 0
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (186) (186) 0 (15,550) (15,550) 0 (91,292) (91,292) 0
01 TIF - Lorn/Kirk Road 0 0 0 (699) (699) 0 (2,717) (2,717) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (195) (195) 0 (6,493) (6,493) 0
HWD - FFE (Funded by LA) 0 4 (4) 0 0 0 (350) (350) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Strategic Change Total (186) (182) (4) (16,444) (16,444) 0 (103,812) (103,812) 0
Total Income (255) (289) 34 (22,880) (22,880) 0 (135,108) (135,108) 0
Net Total 10,857 10,954 (97) 48,260 47,714 546 178,526 178,745 (219)
Appendix 8
Full Year This Financial Year Total Project Costs
31 August 2022
Page 91

Page 92

MONITORING REPORT
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget
Year End
Forecast
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Flood Prevention 3 3 0 474 474 0 1,084 1,084 0
Coastal Protection 0 0 0 20 20 0 200 200 0
Coastal Change Adaptation 0 0 0 159 159 0 159 159 0
Bute Sea Wall Repairs 25 25 0 750 750 0 750 750 0
Helensburgh Flood Mitigation 0 0 0 432 432 0 432 432 0
Bridge Strengthening 57 57 0 1,349 1,349 0 2,049 2,049 0
Local Bridge Maintenance Fund 4 4 0 1,237 1,237 0 5,447 5,447 0
Roads Reconstruction 3,356 3,356 0 9,433 9,433 0 16,294 16,294 0
Roads Reconstruction - Helensburgh CHORD 0 0 0 47 47 0 47 47 0
Roads Reconstruction - Oban CHORD 0 0 0 3 3 0 3 3 0
Helensburgh CHORD - Signage etc 0 0 0 10 10 0 10 10 0
Lighting 0 0 0 740 740 0 1,040 1,040 0
Environmental Projects 0 0 0 734 734 0 934 934 0
Play Park Refurbishment 0 0 0 155 155 0 155 155 0
Public Convenience Upgrades 0 0 0 82 82 0 82 82 0
Footway Improvements 147 147 0 269 269 0 269 269 0
Glengorm - Capping 0 0 0 82 82 0 82 82 0
Glengorm - Cell and Transfer Station (PB) 705 705 0 1,200 1,200 0 1,200 1,200 0
EV Quick Chargers 0 0 0 93 93 0 93 93 0
Tobermory Car Park 56 56 0 951 951 0 951 951 0
Active Travel 0 0 0 500 500 0 500 500 0
Bin Replacement Programme 0 0 0 100 100 0 100 100 0
Server Sustainability 4 4 0 187 187 0 251 251 0
PC Replacement 461 461 0 522 522 0 522 522 0
Telecomms Network 2 2 0 98 98 0 98 98 0
Block Allocation - ICT 0 0 0 0 0 0 1,690 1,690 0
Asset Sustainability Total 4,820 4,820 0 19,627 19,627 0 34,442 34,442 0
Service Development Projects
Preliminary design for  Regional Transport projects 0 0 0 16 16 0 221 221 0
Campbeltown Old Quay 0 0 0 43 43 0 1,424 1,424 0
Fleet Management - Prudential Borrowing 0 0 0 2,187 2,187 0 4,861 4,861 0
Fleet Management 0 0 0 499 499 0 3,358 3,358 0
Lismore Ferry 13 19 (6) 13 19 (6) 666 672 (6)
Millpark Depot Demolition 0 0 0 0 0 0 126 126 0
Oban Depot Development Project 0 17 (17) 0 17 (17) 2,100 2,117 (17)
Lochgilphead Depot Rationalisation 0 0 0 (10) 0 (10) 19 29 (10)
Jackson's Quarry Refurbishment 0 0 0 (2) 0 (2) 283 285 (2)
Witchburn Road Demolition 0 0 0 (1) 0 (1) 157 158 (1)
Safe Streets, Walking and Cycling (CWSS) 0 0 0 544 544 0 2,878 2,878 0
SPT - bus infrastructure 0 0 0 0 0 0 1,405 1,405 0
Cycleways - H&L (FSPT) 0 0 0 240 240 0 3,112 3,112 0
Helensburgh Public Realm - Arts Strategy Fund 0 0 0 51 51 0 53 53 0
Town Centre Funds 536 536 0 1,054 1,055 (1) 3,876 3,877 (1)
Dunoon Cycle Bothy 71 71 0 266 266 0 279 279 0
Dunoon STEM Hub 11 11 0 603 603 0 608 608 0
Ardrishaig North Active Travel 0 0 0 880 670 210 880 880 0
Nature Restoration Fund 0 0 0 346 346 0 346 346 0
Gibraltar Street Public Realm Improvements 9 9 0 248 248 0 250 250 0
Hermitage Park 0 0 0 69 69 0 3,314 3,314 0
Applications Projects 102 102 0 606 606 0 2,883 2,883 0
Service Development Total 742 765 (23) 7,652 7,479 173 33,099 33,136 (37)
Strategic Change Projects
Campbeltown Flood Scheme 31 31 0 9,098 9,098 0 15,215 15,215 0
Street Lighting LED Replacement 49 49 0 791 791 0 3,900 3,900 0
Harbour Investment Programme 186 186 0 15,550 15,550 0 91,292 91,292 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - North Pier Extension 0 0 0 0 0 0 214 214 0
TIF - Oban Airport Business Park 0 0 0 101 101 0 590 590 0
TIF - Halfway House Roundabout 0 0 0 597 47 550 640 640 0
Strategic Change Total 266 266 0 26,138 25,588 550 114,021 114,021 0
Total Expenditure 5,828 5,851 (23) 53,417 52,694 723 181,562 181,599 (37)
INCOME
Asset Sustainability
EV Quick Chargers 0 0 0 (97) (97) 0 (97) (97) 0
Glengorm Capping/New Cell - Prudential Borrowing 0 0 0 (560) (560) 0 (560) (560) 0
Tobermory Car Park 0 0 0 (775) (775) 0 (775) (775) 0Asset Sustainability Total 0 0 0 (2,390) (2,390) 0 (2,390) (2,390) 0
Service Development Projects
Applications Projects 0 0 0 (46) (46) 0 (437) (437) 0
Safe Streets, Walking and Cycling 0 0 0 (550) (550) 0 (2,483) (2,483) 0
SPfT 0 0 0 0 0 0 (1,243) (1,243) 0
Cycleways - H&L (FSPT) 0 0 0 (240) (240) 0 (3,212) (3,212) 0
Town Centre Funds 0 0 0 (382) (382) 0 (1,794) (1,794) 0
Dunoon STEM Hub 0 0 0 (100) (100) 0 (608) (608) 0
Ardrishaig North Active Travel (50) (50) 0 (50) (50) 0 (50) (50) 0
Dunoon Cycle Bothy 0 0 0 (209) (209) 0 (279) (279) 0
Gibraltar Street Public Realm Improvements 0 0 0 0 0 0 (250) (250) 0
Hermitage Park 0 0 0 0 0 0 (3,245) (3,245) 0
Fleet Management - PB 0 0 0 (2,187) (2,187) 0 (4,861) (4,861) 0
Fleet Management (8) (8) 0 0 0 0 0 0 0
Lochgilphead Depot Rationalisation 0 0 0 (1) (1) 0 (1) (1) 0
Millpark Depot Demolition Insurance 0 0 0 0 0 0 (53) (53) 0
Oban Depot - Mill Park Insurance Claim 0 0 0 0 0 0 (1,681) (1,681) 0
Oban Depot - Appin Depot Sale 0 0 0 (150) (150) 0 (150) (150) 0
Lismore Ferry (11) (11) 0 (131) (131) 0 (631) (631) 0
Witchburn Road Demolition 0 0 0 0 0 0 (157) (157) 0
Service Development Total (69) (69) 0 (4,046) (4,046) 0 (21,135) (21,135) 0
Strategic Change Projects
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (186) (186) 0 (15,550) (15,550) 0 (91,292) (91,292) 0
01 TIF - Lorn/Kirk Road 0 0 0 (699) (699) 0 (2,717) (2,717) 0
Strategic Change Total (186) (186) 0 (16,249) (16,249) 0 (94,279) (94,279) 0
Total Income (255) (255) 0 (22,685) (22,685) 0 (117,804) (117,804) 0
Net Departmental Total 5,573 5,596 (23) 30,732 30,009 723 63,758 63,795 (37)
31 August 2022
Full Year This Financial Year Total Project Costs
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR KIRSTY FLANAGAN
Appendix 8
Page 92

Page 93

MONITORING REPORT
Budget Actual Variance Budget Forecast Variance Budget Forecast Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability
Education 1,273 1,273 0 4,281 4,307 (26) 10,761 10,787 (26)
Live Argyll 82 141 (59) 1,200 1,259 (59) 2,086 2,150 (64)
Health and Social Care Partnership 75 124 (49) 2,053 2,104 (51) 2,922 2,973 (51)
Shared Offices 34 34 0 2,469 2,469 0 3,263 3,263 0
Asset Sustainability Total 1,464 1,572 (108) 10,003 10,139 (136) 19,032 19,173 (141)
Service Development Projects
Ardrishaig Primary Pre 5 Unit 0 0 0 0 0 0 2 2 0
Bowmore Primary School - Pre 5 Unit 0 0 0 0 0 0 149 149 0
Clyde Cottage - 600 hour provision 0 0 0 23 23 0 579 579 0
Craignish Primary School - Pre 5 Extension 0 0 0 0 0 0 400 400 0
Iona Primary School - Pre 5 Unit 0 0 0 0 0 0 490 490 0
Islay High and Rosneath Primary School Pitches 0 0 0 (12) 0 (12) 707 719 (12)
Lochgoilhead Primary School - Pre 5 Unit 0 0 0 0 0 0 391 391 0
Park Primary Extension/Pre Fives Unit 0 0 0 0 0 0 341 341 0
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 491 491 0
Bunessan Primary School - Gaelic Medium Improvements 0 0 0 0 0 0 120 120 0
Early Learning and Childcare 0 0 0 0 0 0 850 850 0
Early Learning and Childcare - 1140 Hours 564 564 0 1,036 1,036 0 7,751 7,751 0
CO2 Monitoring - Covid Mitigation in Schools 3 3 0 116 116 0 192 192 0
Early Learning and Childcare - 1140 Hours - CFCR 0 0 0 0 0 0 111 111 0
Bowmore Primary School - Gaelic Medium Grant 0 0 0 38 38 0 38 38 0
Riverside Leisure Centre Refurbishment 0 0 0 (13) 0 (13) 1,232 1,245 (13)
Dunclutha Childrens Home 0 0 0 54 54 0 1,300 1,300 0
Service Development Total 567 567 0 1,242 1,267 (25) 15,144 15,169 (25)
Strategic Change Projects
Campbeltown Schools Redevelopment 38 38 0 76 76 0 2,130 2,130 0
Dunoon Primary 257 257 0 304 304 0 10,869 10,869 0
Replacement of Oban High 96 96 0 136 136 0 3,250 3,250 0
Kirn Primary School 65 65 0 99 99 0 10,119 10,119 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Carbon Management Business Cases 0 0 0 60 60 0 261 261 0
NPDO Schools Solar PV Panel Installations 0 0 0 183 183 0 944 944 0
Non NPDO Schools Solar PV Panel Installations 0 0 0 88 88 0 488 488 0
Carbon Management Fuel Conversions 0 0 0 0 0 0 107 107 0
Carbon Management Capital Property Works 2016/17 0 0 0 20 20 0 39 39 0
Carbon Management - Group Heating Conversion Project 0 0 0 10 10 0 1,948 1,948 0
Kilmory Biomass  Carbon Management 0 0 0 0 0 0 956 956 0
Oil to Gas Heating Conversions 0 0 0 5 5 0 187 187 0
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 10 10 0 310 310 0 11,838 11,838 0
Clean Energy 0 0 0 551 567 (16) 729 745 (16)
Clean Energy 2022-23 0 0 0 500 500 0 500 500 0
CHORD Oban 0 0 0 651 651 0 7,905 7,905 0
CHORD - Helensburgh 0 0 0 28 28 0 6,557 6,557 0
CHORD Dunoon 4 4 0 55 55 0 12,522 12,522 0
Helensburgh Waterfront Deveopment 2,760 2,760 0 2,895 2,895 0 22,557 22,557 0
HWD - FFE (Funded by LA) 5 5 0 344 344 0 350 350 0
Kilmory Business Park Phase 2AA 18 18 0 141 141 0 150 150 0
Dunoon Pier OBC 0 0 0 0 0 0 2,844 2,844 0
Strategic Change Total 3,253 3,253 0 6,478 6,494 (16) 97,896 97,912 (16)
Total Expenditure 5,284 5,392 (108) 17,723 17,900 (177) 132,072 132,254 (182)
INCOME
Asset Sustainability
Education 0 0 0 0 0 0 0 0 0
Live Argyll 0 0 0 0 0 0 0 0 0
Asset Sustainability Total 0 0 0 0 0 0 0 0 0
Service Development Projects
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 (485) (485) 0
Bunessan Primary School - Gaelic Medium Improvements 0 0 0 0 0 0 (30) (30) 0
Early Learning and Childcare 0 0 0 0 0 0 (918) (918) 0
Early Years 1140 Hours 0 0 0 0 0 0 (6,300) (6,300) 0
CO2 Monitoring - Covid Mitigation in Schools 0 (38) 38 0 0 0 0 0 0
Bowmore Primary School - Gaelic Medium Grant 0 0 0 0 0 0 (38) (38) 0
Service Development Total 0 (38) 38 0 0 0 (7,771) (7,771) 0
Strategic Change
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary School 0 0 0 0 0 0 (137) (137) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (195) (195) 0 (6,493) (6,493) 0
HWD - FFE (Funded by LA) 0 4 (4) 0 0 0 (350) (350) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Strategic Change Total 0 4 (4) (195) (195) 0 (9,533) (9,533) 0
Total Income 0 (34) 34 (195) (195) 0 (17,304) (17,304) 0
Net Departmental Total 5,284 5,358 (74) 17,528 17,705 (177) 114,768 114,950 (182)
31 August 2022
Total Project CostsFull Year This Financial YearCurrent Financial Year To Date
Appendix 8
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR DOUGLAS HENDRY
Page 93

Page 94

CAPITAL PLAN 2022-23 APPENDIX 9
Overall Summary
Service
Previous Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Education 36,575 6,097 4,843 2,226 0 0 49,741
Shared Offices 16,687 4,197 544 428 0 0 21,856
ICT 2,126 1,413 1,134 771 0 0 5,444
RIS 21,128 47,004 35,592 33,968 17,811 0 155,503
DEG 15,435 4,240 940 0 0 0 20,615
HSCP 1,246 2,107 441 428 0 0 4,222
Live Argyll 1,274 1,208 458 428 0 0 3,368
CHORD 48,486 4,114 285 0 0 0 52,885
Overall Total 142,957 70,380 44,237 38,249 17,811 0 313,634
Page 94

Page 95

CAPITAL PLAN 2022-23 APPENDIX 9
Education
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability Education Asbestos Control/Removal Works 0 7 0 0 0 0 7
Block Allocation - Education 0 2,716 4,231 2,226 0 0 9,173
Digital Inclusion 20-21 0 9 0 0 0 0 9
Free School Meals 0 14 0 0 0 0 14
Homeless Houses - Housing Quality Standard 0 1 0 0 0 0 1
Internal Refurbishment Budget 0 7 0 0 0 0 7
Lochgilphead Primary School Demolition 0 7 0 0 0 0 7
Pre-5's/Nurseries 0 1 0 0 0 0 1
Primary Schools 0 1,030 23 0 0 0 1,053
School Houses - Housing Quality Standard 0 26 0 0 0 0 26
Secondary Schools 0 463 0 0 0 0 463
Asset Sustainability Total 0 4,281 4,254 2,226 0 0 10,761
Service Development Education Ardrishaig Primar School - Pre Five Extension 2 0 0 0 0 0 2
Bowmore Primary School - Gaelic Medium Grant 0 38 0 0 0 0 38
Bowmore Primary School - Pre Five Unit 149 0 0 0 0 0 149
Bunessan Primary School - Gaelic Medium Improvements 120 0 0 0 0 0 120
Clyde Cottage - 600 hours provision 556 23 0 0 0 0 579
CO2 Monitoring - Covid Mitigation in Schools 76 116 0 0 0 0 192
Craignish Primary School - Pre Five Extension (600 hours funding) 400 0 0 0 0 0 400
Early Learning and Childcare 850 0 0 0 0 0 850
Early Learning and Childcare - 1140 Hours 6,696 1,036 19 0 0 0 7,751
Early Learning and Childcare - 1140 Hours - CFCR 111 0 0 0 0 0 111
Iona Primary School - Pre Five Unit (600 hours funding) 490 0 0 0 0 0 490
Islay High & Rosneath PS Pitches 719 -12 0 0 0 0 707
Lochgoilhead Primary School - Pre Five Unit (600 hours funding) 391 0 0 0 0 0 391
Park Primary Extension and Pre Fives Unit 341 0 0 0 0 0 341
Sandbank Gaelic Pre Five Unit 491 0 0 0 0 0 491
Service Development Total 11,392 1,201 19 0 0 0 12,612
Strategic Change Education Campbeltown Schools Redevelopment 2,054 76 0 0 0 0 2,130
Dunoon Primary School 10,365 304 200 0 0 0 10,869
Kirn Primary School 10,020 99 0 0 0 0 10,119
Replacement of Oban High School 2,744 136 370 0 0 0 3,250
Strategic Change Total 25,183 615 570 0 0 0 26,368
Overall Total 36,575 6,097 4,843 2,226 0 0 49,741
Page 95

Page 96

CAPITAL PLAN 2022-23 APPENDIX 9
Shared Office
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability Shared Offices Argyll House, Dunoon 0 12 0 0 0 0 12
Asbestos Capital Property Works 0 51 0 0 0 0 51
Block Allocation 0 0 236 398 0 0 634
Bowmore Area Office 0 76 0 0 0 0 76
Burnett Building 0 110 0 0 0 0 110
Capital Property Works 0 38 0 0 0 0 38
Fire Risk Assessment Works 0 14 0 0 0 0 14
Hill Street Dunoon Rewire 0 33 0 0 0 0 33
Kilmory Castle 0 1,368 43 0 0 0 1,411
Legionella Control Works 0 215 0 0 0 0 215
Manse Brae District Office 0 1 0 0 0 0 1
Manse Brae Roads Office 0 2 0 0 0 0 2
Our Modern Workspace 0 549 87 30 0 0 666
Asset Sustainability Total 0 2,469 366 428 0 0 3,263
Strategic Change Shared Offices Campbeltown Office Rationalisation 595 1 0 0 0 0 596
Carbon Management - Group Heating Conversion Project (Prudential Borrowing)1,938 10 0 0 0 0 1,948
Carbon Management Business Cases (FPB) 201 60 0 0 0 0 261
Carbon Management Capital Property Works 16/17 19 20 0 0 0 0 39
Carbon Management Fuel Conversions (FPB) 107 0 0 0 0 0 107
Cleaner Energy 0 551 178 0 0 0 729
Cleaner Energy 2022-23 0 500 0 0 0 0 500
Helensburgh Office Rationalisation  (FPB,REC) 11,528 310 0 0 0 0 11,838
Kilmory Biomass Project OBC (FPB,REV) 956 0 0 0 0 0 956
Non-NPDO Schools PV Panel Installations 400 88 0 0 0 0 488
NPDO Schools Solar PV Panel Installations 761 183 0 0 0 0 944
Oil to Gas Heating Conversions (FPB) 182 5 0 0 0 0 187
Strategic Change Total 16,687 1,728 178 0 0 0 18,593
Overall Total 16,687 4,197 544 428 0 0 21,856
Page 96

Page 97

CAPITAL PLAN 2022-23 APPENDIX 9
Major Projects
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Strategic Change CHORD CHORD - Dunoon 12,467 55 0 0 0 0 12,522
CHORD - Helensburgh -Public Realm Imprv 6,529 28 0 0 0 0 6,557
CHORD - Oban 7,254 651 0 0 0 0 7,905
Helensburgh Waterfront Development 19,377 2,895 285 0 0 0 22,557
HWD - FFE 6 344 0 0 0 0 350
Kilmory Business Park Phase 2AA 9 141 0 0 0 0 150
OBC for Dunoon Pier 2,844 0 0 0 0 0 2,844
Strategic Change Total 48,486 4,114 285 0 0 0 52,885
Overall Total 48,486 4,114 285 0 0 0 52,885
Page 97

Page 98

CAPITAL PLAN 2022-23 APPENDIX 9
ICT
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability ICT Block Allocation - ICT 0 0 919 771 0 0 1,690
PC Replacement 0 522 0 0 0 0 522
Server Sustainability 0 187 64 0 0 0 251
Telecomms Network 0 98 0 0 0 0 98
Asset Sustainability Total 0 807 983 771 0 0 2,561
Service Development ICT Applications Projects 2,126 606 151 0 0 0 2,883
Service Development Total 2,126 606 151 0 0 0 2,883
Overall Total 2,126 1,413 1,134 771 0 0 5,444
Page 98

Page 99

CAPITAL PLAN 2022-23 APPENDIX 9
Roads and Infrastructure Services
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability RIS Bin Replacement Programme 0 100 0 0 0 0 100
Bridge Strengthening 0 1,349 350 350 0 0 2,049
Bute Sea Wall Repairs 0 750 0 0 0 0 750
Coastal Change Adaptation 0 159 0 0 0 0 159
Coastal Protection 0 20 80 100 0 0 200
Environmental Projects 0 734 100 100 0 0 934
EV Quick Chargers 0 93 0 0 0 0 93
Flood Prevention 0 474 305 305 0 0 1,084
Footway Improvements 0 269 0 0 0 0 269
Glengorm - Capping 0 82 0 0 0 0 82
Glengorm - Cell and Transfer Station (PB) 0 1,200 0 0 0 0 1,200
Helensburgh CHORD - Signage etc 0 10 0 0 0 0 10
Helensburgh Flood Mitigation 0 432 0 0 0 0 432
Investment in Active Travel 0 500 0 0 0 0 500
Lighting 0 740 150 150 0 0 1,040
Local Bridge Maintenance Fund 0 1,237 4,210 0 0 0 5,447
Play Park Renewal 0 155 0 0 0 0 155
Public Convenience Upgrades 0 82 0 0 0 0 82
Roads Reconstruction 0 9,433 3,449 3,412 0 0 16,294
Roads Reconstruction - Helensburgh CHORD 0 47 0 0 0 0 47
Roads Reconstruction - Oban CHORD 0 3 0 0 0 0 3
Tobermory Car Park 0 951 0 0 0 0 951
Asset Sustainability Total 0 18,820 8,644 4,417 0 0 31,881
Service Development RIS Campbeltown Old Quay 1,381 43 0 0 0 0 1,424
Fleet Management 2,859 499 0 0 0 0 3,358
Fleet Management - Prudential Borrowing 2,674 2,187 0 0 0 0 4,861
Jackson's Quarry Refurbishment 285 -2 0 0 0 0 283
Lismore Ferry Replacement 618 13 15 20 0 0 666
Lochgilphead Depot Rationalisation 29 -10 0 0 0 0 19
Mill Park Depot Demolition 126 0 0 0 0 0 126
Oban Depot Development 2,100 0 0 0 0 0 2,100
Preliminary design for  Regional Transport projects (tif) 205 16 0 0 0 0 221
Witchburn Road Demolition 158 -1 0 0 0 0 157
Service Development Total 10,435 2,745 15 20 0 0 13,215
Strategic Change RIS Campbeltown Flood Scheme 878 9,098 3,908 1,331 0 0 15,215
Harbour Investment Programme PB 6,706 15,550 23,025 28,200 17,811 0 91,292
Street Lighting LED Replacement 3,109 791 0 0 0 0 3,900
Strategic Change Total 10,693 25,439 26,933 29,531 17,811 0 110,407
Overall Total 21,128 47,004 35,592 33,968 17,811 0 155,503
Page 99

Page 100

CAPITAL PLAN 2022-23 APPENDIX 9
Development and Economic Growth
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Service Development DEG Ardrishaig North Active Travel 0 670 210 0 0 0 880
Cycleways - H&L (FSPT) 2,722 240 150 0 0 0 3,112
Dunoon Cycle Bothy 13 266 0 0 0 0 279
Dunoon STEM Hub 5 603 0 0 0 0 608
Gibraltar Street Public Realm Improvements 2 248 0 0 0 0 250
Helensburgh Public Realm - Arts Strategy Fund 2 51 0 0 0 0 53
Hermitage Park 3,245 69 0 0 0 0 3,314
Nature Restoration Fund 0 346 0 0 0 0 346
Safe Streets, Walking and Cycling (CWSS) 2,334 544 0 0 0 0 2,878
SPT - bus infrastructure 1,405 0 0 0 0 0 1,405
Town Centre Funds 2,792 1,054 30 0 0 0 3,876
Service Development Total 12,520 4,091 390 0 0 0 17,001
Strategic Change DEG 01 TIF - Lorn/Kirk Road 2,169 1 0 0 0 0 2,170
05 TIF - North Pier Extension 214 0 0 0 0 0 214
09 TIF - Oban Airport Business Park 489 101 0 0 0 0 590
TIF - Halfway House Roundabout 43 47 550 0 0 0 640
Strategic Change Total 2,915 149 550 0 0 0 3,614
Overall Total 15,435 4,240 940 0 0 0 20,615 Page 100

Page 101

CAPITAL PLAN 2022-23 APPENDIX 9
Health & Social Care Partnership
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability HSCP Ardfenaig 0 125 0 0 0 0 125
Block Allocation 0 0 10 170 0 0 180
Capital Property Works 0 139 0 0 0 0 139
Digitalising telecare 0 100 0 0 0 0 100
Dunoon Hostel 0 0 0 0 0 0 0
Eadar Glinn 0 196 0 0 0 0 196
Glencruitten Hostel 0 75 0 0 0 0 75
Gortonvogie 0 431 421 258 0 0 1,110
Greenwood/Woodlands 0 224 0 0 0 0 224
Kilmory Castle Top Floor Toilet Refurb 0 -2 0 0 0 0 -2
Shellach View 0 0 0 0 0 0 0
Struan Lodge Boiler 0 252 0 0 0 0 252
Thomson Home Rothesay 0 125 0 0 0 0 125
Tigh An Rudha HFE 0 372 10 0 0 0 382
Asset Sustainability Total 0 2,053 441 428 0 0 2,922
Service Development HSCP Dunclutha Childrens Home 1,246 54 0 0 0 0 1,300
Service Development Total 1,246 54 0 0 0 0 1,300
Overall Total 1,246 2,107 441 428 0 0 4,222
Page 101

Page 102

CAPITAL PLAN 2022-23 APPENDIX 9
Live Argyll
Category Service Project
Previous
Years
£000's
2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s
2026-27         
£000s
Total
£000s
Asset Sustainability Live Argyll Aqualibrium 0 95 220 80 0 0 395
Campbeltown Museum - Burnet Bldg 0 40 0 0 0 0 40
Capital Property Works 0 602 0 -5 0 0 597
Inveraray CARS 0 21 0 0 0 0 21
Kintyre Community Education Centre - Lift Shaft Refurbishment 0 38 0 0 0 0 38
Lochgilphead Library Relocation 0 0 0 0 0 0 0
Riverside Leisure Centre - Cladding Upgrade 0 46 0 0 0 0 46
Riverside Leisure Centre - Spa Pool Upgrade 0 80 60 0 0 0 140
Rothesay Swimming Pool 0 0 40 0 0 0 40
The Moat Centre - Gym Store 0 -2 0 50 0 0 48
Victoria Halls, Helensburgh 0 40 0 0 0 0 40
Asset Sustainability Total 0 1,200 458 428 0 0 2,086
Service Development Live Argyll Riverside Leisure Centre Refurbishment 1,245 -13 0 0 0 0 1,232
Service Development Total 1,245 -13 0 0 0 0 1,232
Strategic Change Live Argyll Carbon Management 29 21 0 0 0 0 50
Strategic Change Total 29 21 0 0 0 0 50
Overall Total 1,274 1,208 458 428 0 0 3,368
Page 102

Page 103

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 13 OCTOBER 2022 
TREASURY MANAGEMENT MONITORING REPORT – 31 AUGUST 2022 
1. EXECUTIVE SUMMARY 
1.1. This report sets out the Council’s treasury management position for the period 1 July
2022 to 31 August 2022 and includes information on: 
• Overall borrowing position
• Borrowing activity
• Investment activity
• Economic background
• Interest rate forecast
• Prudential Indicators 
1.2. Estimated borrowing is below the Capital Financing Requirement for the period to 31
August 2022, at this stage in the financial year capital expenditure is below target. Due
to delays caused by the COVID-19 pandemic capital expenditure has been relatively
low over the last twelve months however there is an expectation this will increase back
up again over 2022-23 which will continue to be monitored closely.  
1.3. The net movement in external borrowing in the period 1 July 2022 to 31 August 2022
was a decrease of £3.496m. 
1.4. The levels of investments were £117.4m at 31 August 2022. The rate of return
achieved was 1.802% which compares favourably with the target SONIA rate which
was 1.641%. 
1.5. The Council has significant cash balances which are invested in accordance with its
Annual Treasury Management Strategy on the basis of security first, liquidity second
and then return. The high cash levels are largely due to significant COVID-19 funding
received from the Scottish Government at the end of 2020-21 and in to 2021-22 which
the Council has committed for specific COVID-19 purposes in addition to slippage
within the capital programme resulting in a slower rate of spend. 
Page 103

Page 104

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 13 OCTOBER 2022 
TREASURY MANAGEMENT MONITORING REPORT – 31 AUGUST 2022 
2. INTRODUCTION 
2.1. This report sets out the Council’s treasury management position for the period 1
July 2022 to 31 August 2022 and includes information on: 
• Overall borrowing position
• Borrowing activity
• Investment activity
• Economic background
• Interest rate forecast
• Prudential Indicators 
3. DETAIL
Overall Borrowing Position 
3.1. The table below details the estimated capital financing requirement (CFR) and
compares this with the estimated level of external debt at 31 March 2022. The CFR
represents the underlying need for the Council to borrow to fund its fixed assets and
accumulated capital expenditure. 
Forecast Forecast Forecast  
2022/23 2023/24 2024/25  
£000 £000 £000
CFR at 1 April  309,092 333,276 348,569
Net Capital Expenditure 34,352 26,680 28,232
Less Loans Fund Principal Repayments (5,353) (5,507) (5,788)
Less: NPDO Repayment (4,815) (5,880) (6,038)
Estimated CFR 31 March  333,276 348,569 364,975
Less Funded by NPDO (116,681) (117,064) (112,184)
Estimated Net CFR 31 March  216,595 231,505 252,791
Estimated External Borrowing at 31
March 
212,431 236,654 256,650
Gap 4,164 (5,149) (3,859) 
Page 104

Page 105

3.2. Borrowing is below the Capital Financing Requirement for the period to 31 August
2022. Whilst borrowing rates are still comparatively low the Council has significant
cash balances which reduces the need to borrow in the short term. 
3.3. The Council’s Treasury Management Strategy states that any decision to borrow in
advance will be within forward approved Capital Financing Requirement estimates. 
3.4. The Council’s estimated net capital financing requirement at 31 August 2022 is
£216.6m. The table below shows how this has been financed. £163.6m is funded by
loans and there are substantial internal balances of £170.4m of which £117.4m are
currently invested, as detailed in section 3.7, leaving a net internal balance of £53m. 
Position at
30/06/22
Position at
31/08/22  
£000 £000
Loans 167,072 163,576
Net Internal Balances 5,357 53,019
Total CFR 172,429 216,595 
3.5. During the period from 1 July to 31 August 2022, £3.531m of loans were repaid and £0.035m
of new borrowing was taken.   The analysis of the movement in borrowing is shown in the table
below: 
Actual    
£000
External Loans Repaid 1st July 2022 to 31st August
2022 (3,531)
Borrowing undertaken  1st July 2022 to 31st August
2022 35
Net Movement in External Borrowing   (3,496) 
3.6. The table below summarises the movement in the level and rate of temporary
borrowing at the start and end of the period. 
£000 % Rate
Temp borrowing at 30th June 2022 518 0.55%
Temp borrowing at 31st August 2022 521 0.55% 
Page 105

Page 106

Investment Activity
3.8  The average rate of return achieved in the Council’s investments to 31 August 2022 
was 1.802% compared to the SONIA (Sterling Overnight Index Average) rate for the same
period of 1.641% which demonstrates that the Council continues to achieve a
reasonable rate of return on its cash investments. At 30 June 2022 the Council had
£117.4m of short term investments at an average rate of 1.802%. The table below
details the counterparties that the investments were placed with, the maturity date, the
interest rate and the credit rating applicable for each counterparty. 
Counterparty Maturity Amount
£000
Interest
Rate
Rating  S&P
Clydesdale Bank  Instant
Access
370 1.65% Short Term A-2,
Long Term A-
Clydesdale Bank  20/09/2022 5,000 1.60% Short Term A-2,
Long Term A-          
Toronto Dominion Bank 13/10/2022 5,000 0.50% Short Term A-1+,
Long Term AA-
Close Bros 31/01/2023 2,500 2.00% Short Term A-1,
Long Term A+
AL Ryan Bank 07/12/2022 5,000 1.70% Short Term A-1,
Long Term A+
National Bank of Kuwait 11/04/2023 7,500 2.08% Short Term A-1,
Long Term A
National Bank of Kuwait 17/11/2022 5,000 1.70% Short Term A-1,
Long Term A
Qatar National Bank 21/10/2022 5,000 1.49% Short Term A-1,
Long Term A
Qatar National Bank 13/12/2022 5,000 1.94% Short Term A-1,
Long Term A
Qatar National Bank 10/11/2022 5,000 1.67% Short Term A-1,
Long Term A
AL Ryan Bank 07/12/2022 5,000 1.70% Short Term A-1,
Long Term A+
FADB 10/08/2022 5,000 0.24% Short Term A-1+,
Long Term AA-
FADB 20/01/2023 5,000 1.00% Short Term A-1+,
Long Term AA-
FADB 10/05/2023 5,000 2.11% Short Term A-1+,
Long Term AA-
ANZ 23/02/2023 5,000 3.01% Short Term A-1+,
Long Term AA-          
Rotherham Metropolitan Borough
Council
10/10/2022 7,500 0.90% AA
Cheshire West & Chester Council 12/01/2023 2,500 0.90% AA
Cambridgeshire County Council 22/07/2024 5,000 1.00% AA
Slough Borough Council 26/05/2023 5,000 2.10% AA
Slough Borough Council 29/06/2023 5,000 2.10% AA
Thurrock Borough Council 31/07/2023 5,000 3.00% AA          
MMF- Federated Call 12,000 1.73% AAA
MMF - Insight Call 5,000 1.69% AAA          
Total   117,370     
Page 106

Page 107

3.9 All investments and deposits are in accordance with the Council’s approved list of
counterparties and within the limits and parameters defined in the Treasury
Management Practices. The counterparty list is constructed based on assessments
by leading credit reference agencies adjusted for additional market information
available in respect of counterparties. 
3.10 The Council has significant cash balances which are invested in accordance with its
Annual Treasury Management Strategy. This is largely due to significant COVID-19
funding received from the Scottish Government at the end of 2020-21and in to 2021-
22 which the Council has committed for specific COVID-19 purposes. These cash
balances are in excess of what is required for normal operating purposes but the
economic environment for investments has improved over the last few months with an
increase in interest rates, making investing these monies easier than in previous
years.
Economic and Interest Rate Forecasts 
3.11 The latest economic background is shown in Appendix 1 with the interest rate forecast
in Appendix 2.
Prudential Indicators 
3.12 The prudential indicators for 2022-23 are attached in Appendix 3. 
4. CONCLUSION 
4.1 In the period from 1 July 2022 to 31 August 2022, the Council’s borrowing decreased
by £3.496m, it is currently below the Capital Financing Requirement. There are
substantial internal balances, of which £117.4m is currently invested. The investment
returns were 1.802% which is above the SONIA target of 1.641%. 
5. IMPLICATIONS 
5.1 Policy –       None.  
5.2 Financial –      Complies with Annual Treasury Strategy.
5.3  Legal –       None.
5.4 HR –       None.
5.5 Fairer Duty Scotland –     None. 
5.5.1 Equalities – protected characteristics –  None.
5.5.2 Socio-economic Duty –    None.
5.5.3 Islands –      None.
5.6  Climate Change –     None.
5.7 Risk –       None.
5.8 Customer Service –     None. 
Kirsty Flanagan
Section 95 Officer
12 September 2022 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
Page 107

Page 108

Appendix 1 – Economic Background
Appendix 2 – Interest Rate Forecast
Appendix 3 – Prudential Indicators 
For further information contact Anne Blue, Head of Financial Services 
anne.blue@argyll-bute.gov.uk
Page 108

Page 109

Appendix 1 – Economics Update (at 06-07-22) Latest update not yet received from Link
Group therefore some information may be out of date and will be updated in the next
reporting period.
This section has been provided by Link Group and therefore includes their views and
opinions of future trends and events.
• The second quarter of 2022 saw:
• GDP fall by 0.1% m/m in March and by 0.3% m/m in April;
• An easing rather than a collapse in the composite Purchasing Managers Index (PMI);
• A further rise in Consumer Price Index (CPI) inflation to a new 40-year high of 9.1% in May;
• The first signs that the weakening in economic activity is filtering into a slightly looser labour
market;
• Bank Rate rise to 1.25%, taking it to its highest level since the Global Financial Crisis;
• Gilt yields caught up in the global surge in bond yields triggered by May’s strong rise in US
inflation;
• Rising global bond yields and concerns over growth drive a global sell-off in equity markets.
• Following the 0.1% m/m fall in GDP in March and the 0.3% m/m contraction in April, the
economy is now moving towards a recession (two quarters of falling output in a row). Indeed,
GDP would need to rise by 0.4-0.5% m/m in both May and June to prevent the economy from
contracting in Q2 as a whole. That said, without the joint wind down of the COVID-19 Test and
Trace and vaccination programme, GDP would have risen by 0.2% m/m and 0.1% m/m in
March and April respectively. That’s hardly strong, but it suggests the underlying momentum is
not quite as weak as the headline figures imply.
• There is not much evidence that higher inflation and higher interest rates have yet become a
big drag on activity. Services output did fall by 0.3% m/m in April. But output in consumer-
facing services, conversely, rose by a solid 2.3% m/m in April. And although the Office for
National Statistics (ONS) said that some of the 1.0% m/m fall in manufacturing output was
linked to the drag on activity from higher prices, it also said that some of the 0.4% m/m drop in
construction output in April was a drop back after the boost in the wake of February’s Storm
Eunice.
• The fact that the composite PMI didn’t fall in June also suggests that in Q2 (Apr – June) real
GDP has softened rather than collapsed. The S&P Global/CIPS all-sector PMI for June was
unchanged from its level of 53.1 in May, signalling tepid but positive growth. According to the
Lloyd’s barometer, business confidence in May also remained remarkably resilient.
• Despite the fall in the GfK composite measure of consumer confidence to a new record low of -
41 in June, April’s £1.4bn rise in consumer credit suggests households appear to have turned
to credit to support their spending as the cost-of-living squeeze has intensified. Meanwhile, the
household saving rate held steady at 6.8% in Q1 in line with its long-term average and we
expect households to lower their saving rate further when the bigger falls in real incomes come
in Q2 and Q3 to cushion the blow to spending.
• The Chancellor’s latest fiscal support of £10.3bn (0.5% of GDP), which comprised £15.3bn of
handouts to households, partly funded by a £5bn tax on the profits of oil and gas producers,
will help support GDP in the second half of the year. And with the Prime Minister and the
Chancellor desperately needing to boost their popularity, some tax cuts may be announced in
the Autumn Budget.
Page 109

Page 110

• There has been early signs that the recent weakening in economic activity is filtering through
into a slightly looser labour market. The unemployment rate edged up from 3.7% in the three
months to March to 3.8%. The single-month data showed that employment fell by 254,000 in
April and the unemployment rate rose from 3.5% to 4.2%. And the upward march in the
number of job vacancies slowed, with the three-month average only rising from 1.296m in April
to 1.300m in May. A seasonal adjustment of the single-month data implies that vacancies fell
in May for the first time since COVID-19 was rife in December. 
• At the same time, a 1.8% m/m fall back in average earnings in April meant that the 3myy rate
of earnings eased from 7.0% in March to 6.8% in April. And a lot of the 0.5% m/m rise in
earnings excluding bonuses was probably due to the 6.6% rise in the National Living Wage on
1st April. The 3myy rate of earnings excluding bonuses stayed at 4.2%. 
• That said, conditions in the labour market remain exceptionally tight. The unemployment rate
is still close to its recent 47-year low, and there is the same number of unemployed people as
job vacancies and at 6.8% in April, the 3myy rate of average earnings is at a 10-year high
(although it is still falling in real terms) and is well above the 3.0-3.5% that is broadly consistent
with the 2.0% inflation target (assuming that productivity growth is 1.0-1.5%).  
• CPI inflation rose from 9.0% in April to a new 40-year high of 9.1% in May and it is not yet
close to its peak. The increase in CPI inflation in May was mainly due to a further leap in food
price inflation from 6.7% to a 13-year high of 8.5%. With the influence of increases in
agricultural commodity prices yet to fully feed into prices on the supermarket shelves, we think
that food price inflation will rise above 10% in September. And with two-thirds of the
observation period for the Ofgem price cap having now passed, something like a 40% rise in
utility prices is pretty much baked in the cake for October. The further rise in core producer
price inflation, from 13.9% to 14.8%, suggests that core goods CPI inflation will probably rise
to 14% before long. We think that will take CPI inflation to a peak of around 10.5% in October. 
• The rise in services CPI inflation from 4.7% in April to 4.9% in May suggests that domestic
price pressures are still strengthening. 
• There now seems to be an even greater likelihood that second-round effects, whereby high
inflation feeds back into higher price and wage expectations, keep inflation higher for longer.
For some time, the Monetary Policy Committee (MPC) has placed a lot of weight on the results
of the Bank of England’s monthly Decision Maker Panel which asks businesses how they
expect to change their prices and wages over the next year. May’s survey revealed that
businesses still expect to raise their selling prices by 6.0% and their wages by 4.8% over the
next year. Meanwhile, XpertHR said that pay settlements across the economy stayed at a 30-
year high of 4.0% in May. The government appears to be contemplating raising public sector
pay by up to 5%. And the 7.1% pay rise granted to some railway workers sets a high bar for
the negotiations that led to train strikes across large parts of the country in mid-June. 
• The MPC has now increased interest rates five times in as many meetings and raised rates to
their highest level since the Global Financial Crisis. Even so, coming after the Fed raised rates
by 75 basis points (bps) in June and a handful of other central banks have recently raised
rates by 50bps, the Bank of England’s action is relatively dovish. The MPC’s decision not to
follow the Fed and raise rates by more makes some sense. The UK’s status as a larger
importer of commodities, which have jumped in price, means that households in the UK are
now facing a much larger squeeze on their real incomes. 
• But the MPC’s new guidance is that if there are signs of “more persistent inflationary
pressures” it will, “if necessary act forcefully in response”. We expect the MPC to continue to
Page 110

Page 111

raise rates in steps of 25bps rather than 50bps. We think the MPC will raise rates from 1.25%
now to a peak of 2.75% next year. That’s higher than the peak of 2.00% forecast by
economists, but lower than the peak priced into the financial markets. 
• Gilt yields have been caught up in the global surge in bond yields triggered by the surprisingly
strong rise in CPI inflation in the US in May. The rises in two-year gilt yields (to a peak of
2.37% on 21st June) and 10-year yields (to a peak of 2.62%) took them to their highest level
since 2008 and 2014 respectively. And in response to signs that central banks (particularly the
US Fed) are going to raise interest rates faster to get on top of inflation, we now think that 10-
year gilt yields will reach a peak of 2.70% (up from 2.39% currently) this year and into 2023. 
• While the S&P 500 is 8.4% below its level a month ago, the FTSE 100 is 5.7% below it. Part of
the sell-off has been driven by the rapid rise in global bond yields and the resulting downward
pressure on equity valuations as well as concerns over economic growth. 
• Finally, the pound has already weakened from $1.37 and €1.21 earlier this year to $1.21 and
€1.16. A lot of these moves have been driven by concerns over the outlook for the global
economy and the resulting poor performance of risky assets, which has increased the demand
for the dollar relative to sterling. If interest rates rise faster and further in the US than in the UK,
rate differentials and a worsening in risk appetite will push the pound even lower, from $1.21
now to $1.18 by the end of 2022. We don’t expect the pound to fall by as much against the
euro (from €1.16 to €1.14 next year). But once global inflation and global interest rates peak,
the pound will probably benefit from the return of risk appetite. It may rise to $1.25 by the end
of 2023 and to $1.30 by the end of 2024. 
MPC meetings 5th May and 16th June 2022 
• After the Bank of England became the first major western central bank to put interest rates up
in this upswing in December, it has quickly followed up its first 0.15% rise by a further four
0.25% rises to 1.25%, in what is very likely to be a series of increases repeated throughout the
rest of 2022 and into 2023. 
• In May, the MPC voted 6-3 vote in favour of a 0.25% increase, but not only was this the first
time in its 25-year history that the MPC had raised rates at four meetings in a row but also
three members (Haskel, Mann and Saunders) wanted a 0.5% hike (up from none in March). 
However, GDP growth was forecast to drop to -0.25% in 2023 (+1.25% previously) and only
+0.25% in 2024 (+1.00% previously).  Anyone for a recession? 
• Nonetheless, over Q2, it is clear central banks in the developed economies have placed the
dampening down of inflation pressures front and centre of their primary objectives, even if it
comes at the cost of sluggish growth or, indeed, recession (mild ideally but it is very difficult to
micro-manage economic performance).  The Monetary Policy Committee (MPC) is in step with
this approach although, arguably, the UK economy is dragging its feet to a greater extent than
that seen in the US.   
• What are the key factors for consideration?  First, the CPI measure of inflation is already at
9.1%, and the Bank of England anticipates it will peak near to 11% just before Christmas. 
With the cost-of- living squeeze in full swing by that juncture, and unemployment likely to be
ticking upwards, we judge that the Bank will pause following its March 2023 meeting and judge
it has done enough so long as inflation starts to fall, albeit at a slow pace.  To that extent, we
can envisage the MPC waiting a full year before loosening the reins and starting to cut Bank
Rate in spring 2024. However, given the number of geopolitical factors that could push this
forecast off track, we would caution against taking a strong view on how interest rate
Page 111

Page 112

movements evolve and instead focus on optimising balance sheet management and the risk
management of investment and debt portfolios. 
• Regarding gilt yields, all developed economies have seen a considerable uplift in government
bond yields across the whole curve since the start of 2022 and, in many ways, gilts have
simply played catch-up of late.  To that end, we have revised our PWLB forecasts upward and
you will even see we have a 3.7% PWLB rate projected for the 25-year part of the curve in
both 2022 and 2023.  However, as headline inflation falls back, we project a slow reduction in
gilt yields as investors acknowledge that price pressures are gradually coming under control. 
• At the 16th June MPC meeting, part of the reason for the Committee only seeing a 0.25% hike
as necessary is the prevailing weak economic data.  The vote was again 6-3 (the same as in
May) but the words were more hawkish with the Bank strengthening its forward guidance.  It
deleted the previous phrase that “some degree of further tightening…may still be appropriate”
and replaced it with “the scale, pace and timing of any further increases in Bank Rate will
reflect the Committee’s assessment of the economic outlook and inflationary pressures” and
that “the Committee will be particularly alert to indications of more persistent inflationary
pressures, and will, if necessary, act forcefully in response.” 
• Whereas in May two members objected to the guidance that rates will rise further, it appears
that all members are behind this new, stronger guidance.  However, the growing evidence that
firms’ price and wage expectations have become dislodged from the 2.0% target suggest that
the Bank is between a rock and a hard place in navigating the appropriate monetary policy
response.  As always, the economic data will be key to anticipating whether our assumptions
remain sound. 
Page 112

Page 113

Appendix 2 – Interest Rate Forecast 
The Council has appointed Link Group as its treasury advisors and part of their service is to
assist the Council to formulate a view on interest rates. The PWLB rate forecasts below are
based on the Certainty Rate (the standard rate minus 20 bps) which has been accessible to
most authorities since 1st November 2012. 
The latest forecast on 21st June is compared below to the previous forecast (10th May).  A
comparison of these forecasts shows that PWLB rates have increased generally and show
a speed up in the rate of increase in Bank Rate as inflation is now posing a greater risk.
The increase in PWLB rates reflects a broad sell-off in sovereign bonds internationally as
inflation concerns abound.  To that end, the MPC has tightened short-term interest rates
with a view to trying to slow the economy sufficiently to keep the secondary effects of
inflation – as measured by wage rises – under control, but without pushing the economy
into recession.  
Our current and previous PWLB rate forecasts below are based on the Certainty Rate (the
standard rate minus 20 bps) which has been accessible to most authorities since 1st
November 2012. 
• LIBOR and LIBID rates ceased for new contracts at the end of 2021. In a continuation
of our previous forecasts, our money market yield forecasts are based on expected
average earnings by local authorities for 3 to 12 months.
• Our forecasts for average earnings are averages i.e., rates offered by individual banks
may differ significantly from these averages, reflecting their different needs for
borrowing short-term cash at any one point in time. 
A SUMMARY OVERVIEW OF THE FUTURE PATH OF BANK RATE
• Our central forecast for interest rates was last updated on 21st June and reflected a
view that the MPC will be keen to further demonstrate its anti-inflation credentials by
delivering a 0.25% increase in Bank Rate in August, September, November,
December, February and March i.e., the next six MPC meetings.
Link Group Interest Rate View 21.06.22
Sep-22 Dec-22 Mar-23 Jun-23 Sep-23 Dec-23 Mar-24 Jun-24 Sep-24 Dec-24 Mar-25 Jun-25
BANK RATE 1.75 2.25 2.75 2.75 2.75 2.75 2.50 2.50 2.25 2.25 2.25 2.25
3 month ave earnings 2.00 2.50 2.80 2.80 2.80 2.80 2.60 2.50 2.30 2.30 2.20 2.20
6 month ave earnings 2.50 2.80 3.00 3.00 2.90 2.90 2.80 2.70 2.60 2.50 2.40 2.30
12 month ave earnings 3.10 3.20 3.20 3.20 3.00 2.90 2.80 2.60 2.50 2.40 2.40 2.40
5 yr   PWLB 3.20 3.30 3.30 3.30 3.30 3.20 3.10 3.00 3.00 3.00 2.90 2.90
10 yr PWLB 3.40 3.50 3.50 3.50 3.50 3.40 3.30 3.20 3.20 3.20 3.10 3.10
25 yr PWLB 3.70 3.70 3.70 3.70 3.70 3.70 3.60 3.50 3.50 3.40 3.40 3.30
50 yr PWLB 3.40 3.40 3.50 3.50 3.40 3.40 3.30 3.20 3.20 3.10 3.10 3.00
Link Group Interest Rate View 10.5.22
Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 Sep-23 Dec-23 Mar-24 Jun-24 Sep-24 Dec-24 Mar-25 Jun-25
BANK RATE 1.25 1.50 1.75 2.00 2.00 2.00 2.00 2.00 1.75 1.75 1.75 1.75 1.75
3 month ave earnings 1.20 1.50 1.70 2.00 2.00 2.00 2.00 2.00 1.70 1.70 1.70 1.70 1.70
6 month ave earnings 1.60 1.90 2.10 2.20 2.20 2.20 2.20 2.10 2.00 1.90 1.90 1.90 1.90
12 month ave earnings 2.00 2.20 2.30 2.40 2.40 2.30 2.30 2.20 2.20 2.10 2.10 2.10 2.10
5 yr   PWLB 2.50 2.50 2.60 2.60 2.60 2.60 2.60 2.60 2.50 2.50 2.50 2.50 2.50
10 yr PWLB 2.80 2.80 2.90 2.90 2.90 2.90 2.90 2.90 2.80 2.80 2.80 2.80 2.80
25 yr PWLB 3.00 3.10 3.10 3.20 3.20 3.20 3.10 3.10 3.00 3.00 3.00 3.00 3.00
50 yr PWLB 2.70 2.80 2.80 2.90 2.90 2.90 2.80 2.80 2.70 2.70 2.70 2.70 2.70
Page 113

Page 114

• The CPI measure of inflation is now forecast to rise to close to 11% in Q4 2022 and the
MPC will be keen to stifle the prospect of average earnings data (6.8% y/y currently
including bonuses) providing further upside risk to inflationary factors that are primarily
being driven by supply-side shortages. 
• When Bank Rate reached 1% in May, the MPC indicated (no earlier than August) that it
will also consider the extent to which it implements Quantitative Tightening (QT),
primarily the selling of its gilt holdings. However, they are likely to take any such
decision cautiously as they are already not refinancing maturing debt.
• Notwithstanding the MPC’s clear desire to increase Bank Rate throughout 2022,
negative real earnings, the 54% hike in the Ofgem energy price cap from April (to be
followed by a potential 40%+ further increase from October), at the same time as
employees (and employers) have incurred a 1.25% Health & Social Care Levy, growing
commodity and food inflation plus council tax rises - all these factors will hit
households’ finances hard.  However, lower income families will be hit
disproportionately hard despite some limited assistance from the Chancellor to
postpone the full impact of rising energy costs.
• Given the above outlook, it poses a question as to whether the MPC may shift into
protecting economic growth if it flatlines or contracts through 2022.  Accordingly, we
remain tentative about whether the MPC will increase Bank Rate as far as the market
is currently pricing in (3.25% in April 2023).
• In the upcoming months, our forecasts will be guided not only by economic data
releases and clarifications from the MPC over its monetary policies, but the on-going
conflict between Russia and Ukraine, including the manner in which the West and
NATO respond through sanctions and/or military intervention.  Currently, oil, gas,
wheat and other mainstream commodities have risen significantly in price and central
banks will have to balance whether they prioritise economic growth or try to counter
supply-side shock induced inflation. 
• On the positive side, consumers are estimated to be sitting on over £160bn of excess
savings left over from the pandemic so that will cushion some of the impact of the
above increases.  However, most of those are held by more affluent people whereas
lower income families already spend nearly all their income before these increases hit
and have few financial reserves. 
PWLB RATES
• The yield curve has steepened considerably through the quarter and PWLB 5 to 50
years Certainty Rates are, generally, in the range of 2.75% to 3.75%.
• We view the markets as having built in, already, nearly all the effects on gilt yields of
the likely increases in Bank Rate and the poor inflation outlook (although we thought
that in May and markets went much further than expected in respect of the gilt market
sell-off).
• It is difficult to say currently what effect the Bank of England starting to sell gilts will
have on gilt yields now that Bank Rate has gone to above 1%.  Nothing will be decided
before August, however, but the Bank is likely to act cautiously as it has already started
on not refinancing maturing debt.  A pure roll-off of the peak £875bn gilt portfolio by not
refinancing bonds as they mature, would see holdings fall to about £415bn by 2031,
which would be about equal to the Bank’s pre-pandemic holding. 
• Increases in US treasury yields over the next few months could add further upside
pressure on gilt yields as they have done since the turn of the year.
Page 114

Page 115

Appendix 3 – Prudential Indicators 
PRUDENTIAL INDICATOR 2022-23 2022-23 2023-24 2024-25
(1).  EXTRACT FROM BUDGET          
Forecast
Outturn
Original
Estimate
Forecast
Outturn
Forecast
Outturn
Capital Expenditure £'000 £'000 £'000 £'000    
Non - HRA 34,352 51,699 26,680 28,232    
TOTAL 34,352 51,699 26,680 28,232          
Ratio of financing costs to net revenue
stream          
Non - HRA 2.70% 2.70% 4.56% 4.57%        
Net borrowing requirement          
brought forward 1 April * 309,092 292,303 333,145 348,569    
carried forward 31 March * 333,276 333,145 348,569 364,975    
in year borrowing requirement 24,184 40,842 15,424 16,406     
In year Capital Financing Requirement   
Non - HRA 24,184 40,842 15,424 16,406    
TOTAL 24,184 40,842 15,424 16,406     
Capital Financing Requirement as at 31 March   
Non - HRA 333,276 333,145 348,569 364,975    
TOTAL 333,276 333,145 348,569 364,975                             
Page 115

Page 116

PRUDENTIAL INDICATOR 2022-23 2023-24 2024-25
(2).  TREASURY MANAGEMENT PRUDENTIAL
INDICATORS
£'M £'M £'M       
Authorised limit for external debt -     
borrowing 228 252 272    
other long term liabilities 120 121 116     
TOTAL 348 373 388     
Operational boundary for external debt -     
borrowing 223 247 267     
other long term liabilities 117 118 113     
TOTAL 340 365 380     
Upper limit for fixed interest rate exposure   
Principal re fixed rate borrowing  190% 190% 190%     
Upper limit for variable rate exposure   
Principal re variable rate borrowing  60% 60% 60%     
Upper limit for total principal sums invested for over
364 days
£20m £20m £20m     
(per maturity date)     
Maturity structure of new fixed rate borrowing during 2022/23
under 12 months       
12 months and within 24 months
24 months and within 5 years
5 years and within 10 years
10 years and above
upper limit lower limit
30% 0%
30% 0%
30% 0%
40% 0%
100% 0%
Page 116

Page 117

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 13 OCTOBER 2022
RESERVES AND BALANCES – UPDATE AS AT 31 AUGUST 2022 
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to advise Members of the overall level of
reserves held by the Council as well as providing detail on the monitoring of the
earmarked balances held within the General Fund. 
1.2 The Council has a total of £364.558m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
1.3 At 31 March 2022 the Council had a total of £103.626m of usable reserves.  Of
this:
• £2.682m relates to the Repairs and Renewals Fund
• £4.414m relates to Capital Funds
• £96.530m was held in the General Fund, with £89.433m of this balance
earmarked for specific purposes.
1.4 Of the earmarked balance of £89.433m: 
• £46.510m is invested or committed for major initiatives/capital projects
• £4.094m has already been drawn down
• £32.402m is still to be drawn down in 2022-23
• £6.427m is planned to be spent in future years 
Appendix 1 provides further information on the unspent budget earmarkings and
Appendix 2 provides further information on the COVID earmarkings. 
1.5 The Council’s General Fund contingency level is set at 2% of net expenditure for
2022-23 which equates to £5.256m.  At the beginning of the financial year there
was £1.841m of unallocated General Fund Balance (over and above contingency). 
At the Council meeting on 24 February 2022 it was agreed that the budgeted
revenue surplus of £2.482m would be transferred into the general fund. After taking
this into consideration and the current forecast outturn for 2022-23, the Council is
estimated to have a £4.166m surplus over contingency. 
Page 117

Page 118

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 13 OCTOBER 2022
RESERVES AND BALANCES - UPDATE AS AT 31 AUGUST 2022 
2. INTRODUCTION 
2.1 This report outlines current balances on the Council’s reserves, both usable and
unusable. It also provides detail on the monitoring of the earmarked balances
within the General Fund.   
3. DETAIL 
3.1 Types of Reserves 
3.1.1 Usable Reserves - Councils have powers to establish certain resource backed
reserves which can be used to fund expenditure.  The powers of councils to
establish reserves are laid out in Schedule 3 of the Local Government
(Scotland) Act 1975.  These allow councils to establish a Renewal and Repairs
Fund, Insurance Fund and Capital Fund. Councils can also establish a Useable
Capital Receipts Reserve.  The Council must also maintain a General Fund and
can earmark balances for specific purposes within the General Fund. 
3.1.2 Unusable Reserves – Councils are also required to establish certain reserves
that are not backed by resources. They are required purely for accounting
purposes and do not represent resources available for councils to utilise. The
Pensions Reserve, Revaluation Reserve, Capital Adjustment Account, Financial
Instruments Adjustment Account and Accumulated Absences Account are
examples of unusable reserves. 
3.2 Reserve Balances at 31 March 2022 
3.2.1 The balances on each type of reserve at 31 March 2022 are set out in the two
tables below, per the Unaudited Accounts for 2021-22. 
Unusable Reserves £000
Revaluation Reserve 145,903
Capital Adjustment Account 223,147
Financial Instruments Adjustment Account (2,198)
Pensions Reserve 4,634
Accumulated Absences Account (6,928)
Total Unusable Reserves 364,558 
Usable Reserves £000
Repairs and Renewals Fund 2,682
Capital Fund and Usable Capital Receipts Reserve 4,414                                                                                                                
General Fund  96,530
Total Usable Reserves  103,626
Total Reserves  468,184 
Page 118

Page 119

3.2.2 The Revaluation Reserve represents the unrealised gains in the valuation of
fixed assets. The Capital Adjustment Account represents the difference
between depreciation based on proper accounting practice and statutory
charges for financing capital expenditure. The Financial Instruments Adjustment
Account represents the difference between gains and losses on borrowing and
statutory capital financing charges. The Pensions Reserve represents the
difference between pension costs based on proper accounting practice and
payments made for pension costs. The Accumulated Absences Account
represents the costed difference between holiday pay entitlement and actual
holidays taken at 31 March. 
3.2.3 The Repairs and Renewals Fund was established to support funding of renewal
and replacement of school equipment.  Schools can only draw on the Repairs
and Renewals Fund to the extent they have previously paid into the Fund and
contributions must be contained within schools devolved budgets. 
3.2.4 The Capital Fund was established to receive all capital receipts generated by
the Council and can be used to support the capital plan or meet the principal
repayments on loan charges. The Council decides as part of the budget
process each year how it wishes to draw funding from the Capital Fund. 
3.2.5 The Usable Capital Receipts Reserve relates to the accumulated unspent
capital receipts from sale of council houses prior to transfer of the housing
stock. The reserve forms part of the Council’s Strategic Housing Fund and can
only be used for investment in social housing. The reserve will be used in
accordance with the approach to investing in housing agreed by the Council in
August 2012. 
3.3 General Fund 
3.3.1 The General Fund balance at 31 March 2022 can be analysed as follows: 
Balance
31/03/22
£000
Balance on General Fund as at 31 March 2021 78,245
Increase to General Fund balance at end of 2021-22 18,285
Earmarked Balances (89,433)
Contingency allowance at 2% of net expenditure (5,256)
Unallocated balance as at 31 March 2022 1,841 
3.3.2 The General Fund includes balances that the Council has agreed to earmark for
specific purposes. Some of these earmarked balances will be spent during the
current financial year and some of them will be held over and spent in later
years. The table below shows the balance at 31 March 2022, the amounts that
are currently invested or set aside for major initiatives, the amount already
spent and planned to be spent in the current year, the amount to be spent in
future years and any sums no longer required to be earmarked. Appendix 1
provides further details on the breakdown of unspent budget earmarkings. 
Page 119

Page 120

Officers have reviewed and updated the spending profiles. Appendix 2 provides
further details on the breakdown of COVID reserves. 
3.4 Unallocated General Fund Balance 
3.4.1 The Council’s General Fund contingency is set at 2% of net expenditure for
2022-23 and amounts to £5.256m.  At the beginning of the financial year there
was £1.841m of unallocated General Fund Balance (over and above
contingency).   After taking into consideration the budgeted allocation to the
General Fund agreed by Council on 24 February 22 and the current forecast
Earmarking
Category
Balance
31/03/2022 -
per year
end
published
report
Transfers
between
categories
Invested or
committed
for major
initiatives
/capital
projects
Drawn-
down to
2022-23
Budget as
at 31/08/22
Still to be
drawn-
down in
2022-23
Planned
Spend
Future
Years
Balance no
Longer
Required
£000 £000 £000 £000 £000 £000 £000
Strategic Housing
Fund 6,590 6,233 357
Investment in
Affordable
Housing
3,300 3,300
Capital Projects 24,722 24,722
Lochgilphead and
Tarbert
Regeneration
2,271 2,271
Support for Rural
Growth Deal 1,058 1,058
Asset
Management
Investment
2,607 2,607
Piers and
Harbours
Investment Fund
1,643 1,643
Scottish
Government
Initiatives
3,141 2,754 387
CHORD 349 150 199
DMR Schools 1,982 416 1,566
Energy Efficiency
Fund 218 218
Existing Legal
Commitments 475 475
Unspent Grant 12,834 950 872 10,560 452
Unspent Third
Party Contribution 166 10 156
Previous Council
Decision - Other 4,343 -55 2,069 56 2,163 0
Redundancy
Provision 1,732 500 1,232
Supporting
Organisational
Change
1,588 11 489 1,088
Spend to Save
Route
Optimisation
100 100
Timing Delay 499 499
Hermitage Park 4 4
COVID-19 9,407 257 1,737 7,354 59
Unspent Budget 10,404 55 1,400 635 5,414 3,010
Totals 89,433 0 46,510 4,094 32,402 6,427 0
Page 120

Page 121

outturn position for 2022-23, the Council is forecast to have a £4.166m surplus
over contingency. 
Heading Detail £000
Unallocated General Fund
as at 31 March 2022
This is the balance that is
unallocated over and above the 2%
contingency, which amounts to
£5.256m
1,841
Budgeted allocation to
General Fund for 2022-23
Budget
Per the Budget Motion at Council on
24 February 2022
2,482
Current Forecast Outturn
for 2022-23 as at 31
August 2022 
(157)
Estimated Unallocated
balance as at 31 March
2023 
4,166 
3.4.2 Note that the unallocated balance of £4.166m does not take into account the
2022-23 pay award currently in the final stages of negotiation. 
3.5 Loans Fund Review 
3.5.1 At the Council meeting on 27 February 2020, it was agreed that the one-off re-
profiling gain of £20.561m generated by the loans fund review should be used
partly to create a provision for the increasing principal repayments over the next
10 years (£7.649m) with the remainder of the gain (£12.912m) used to fund the
known liabilities/cost pressures. The table below shows what has been drawn
down against the one-off gain and the remaining balance. 
Agreed
Allocation
Transferred
to
Earmarked
Reserves / 
20-21 / 21-22
Budget
Transferred
to
Earmarked
Reserves /
22-23
Budget
Balance
Remaining 
£000 £000 £000 £000
Provision for the increasing
principal repayments 7,649   7,649
Provision to Support
Organisational Change 500 (500)  0
Estimated Cost of 2020-21
redundancies that are part of
budget savings proposals
600 (600)  0
Future Redundancies
Provision 1,500 (1,500)  0
Spend to Save Route
Optimisation 100 (100)  0
Funding Gap in Capital
Programme 2,619   2,619
Capital Programme
Intolerable Red Risks 574 (574)  0
Campbeltown Flood
Prevention Scheme 1,406   1,406
Significant Strategic Change
Projects  5,013 (2,856)  2,157
Page 121

Page 122

2020-21 Revenue Budget
Contribution  600 (600)  0 
20,561 (6,730)  13,831 
4. CONCLUSION 
4.1 The report outlines the overall reserves and balances for the Council covering
the purpose and level of each reserve.  It also provides detail as to expenditure
against earmarked balances held within the General Fund.   
4.2 As at 31 August 2022 the estimated unallocated General Fund, after taking into
consideration the budget motion and forecast outturn for 2022-23 is £4.166m.     
5. IMPLICATIONS 
5.1 Policy - Earmarked funds and funds set aside for delivery of
Single Outcome Agreement are available to support
Council Policy.
5.2 Financial -  Outlines the balances held with the Council’s usable
and unusable reserves.     
5.3 Legal -  None.
5.4 HR -  None.
5.5 Fairer Scotland Duty- None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty -  None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  A contingency of £5.256m (equivalent to 2% of net
expenditure) has been set aside as part of the
general fund.  This has been subject to a risk
assessment. 
5.8 Customer Service -  None. 
Kirsty Flanagan
Section 95 Officer 
9 September 2022 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
APPENDICES
Appendix 1 – Earmarked Reserves breakdown of unspent budget
Appendix 2 – Earmarked Reserves breakdown of COVID earmarkings 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk 
Page 122

Page 123

APPENDIX 1
Earmarked Reserves - Unspent Budget
As at 31 August 2022
Ref Department Service Description Opening Balance Budget
Drawdown
New earmarking
during 22-23
Remaining
Balance
Still to be drawn
down in 22-23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
001 Chief Executive's Unit Community Planning Communities and Partnership Team 8,855 8,004 851 851 0 The funds have originated from externally sourced income due to an employee being seconded to the
Scottish Community Development Centre (SCDC).  The funds will be used to support the team in
relation to meeting its priorities of Building Back Better (Communities), Climate Change and the review
of the Argyll and Bute Outcome Improvement Plan.
8,855 0 0
002 Chief Executive's Unit Community Planning Gaelic Development 8,235 8,235 8,235 0 To fund Gaelic specific work and project work of the Community Planning Partnership including the
development of the new 10 year Outcome Improvement Plan
8,235 0 0
003 Chief Executive's Unit Financial Services Financial Systems 114,000 80,252 33,748 33,748 0 To fund the completion of the implementation of the Oracle Fusion Financial Management System, a
software update for cash receipting to ensure card payments can still be taken and the procurement
and implementation of a new system to manage the requirements of the IFRS16 Leases accounting
standard.
114,000 0 0
004 Chief Executive's Unit Financial Services Accounting and Budgeting Team
Resilience
95,000 64,336 30,664 11,664 19,000 To fund the implementation of a new staffing structure in 2022/23 as agreed at ELT on 12 April 2022. 
This will provide funding to cover the additional staffing costs in 2022/23 and the training costs over
the period 2022/23 to 2026/27
76,000 5,000 14,000
005 Chief Executive's Unit Financial Services CIPFA 32,530 32,530 32,530 0 CIPFA Training - To fund the professional training costs for staff undertaking the CIPFA professional
accountancy qualification.
32,530 0 0
006 Chief Executive's Unit Financial Services Scottish Government Funding -
Welfare Reform/Discretionary
Housing Payments (agreed at
Council February 2014)
18,595 18,595 0 18,595 The Council was allocated additional funding of £550k from the Scottish Government late in 2013-14.
This money was allocated to support the Community Learning and Development Team to provide
courses to support Universal Credit claimants 2019/2020 to support the recruitment of casual tutors
and the purchase and upgrade of laptops. The monies were not utilised however it will now be
required to top up the Scottish Welfare Fund and DHP monies for 2022/23 as it is likely that given the
current cost of living crisis that more people will be in need of support through these funds
0 18,595 0
007 Executive Director (Douglas Hendry) Across Services / Education Digital Projects (Supply Staff
Booking System)
35,000 35,000 35,000 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063m and a general provision still to be allocated £0.189m
35,000 0 0
008 Executive Director (Douglas Hendry) Commercial Services Rothesay Pavilion Charity 750,000 750,000 375,000 375,000 Agreed at Council meeting February 2020, £750k additional revenue support subject to conditions
which seek to minimise the risk to the Council as far as is reasonably practicable including requirement
for adequate business and financial management and regular reporting by RPC.
375,000 375,000 0
009 Executive Director (Douglas Hendry) Commercial Services Demolition of former Lochgilphead
Primary and Rothesay Secondary
School
320,000 320,000 320,000 0 To fund the demolition of the former Lochgilphead Primary School and former Rothesay Academy
(subject to the removal of the listing).
320,000 0 0
010 Executive Director (Douglas Hendry) Commercial Services Rothesay Pavilion Essential repairs 306,400 306,400 306,400 0 Essential repairs to deal with potential health and safety risks and to avoid further deterioration. 
Budget provision was approved by the Policy and Resources Committee on 21 August 2014. 
306,400 0 0
011 Executive Director (Douglas Hendry) Commercial Services Estates - NDR Revaluation Appeals 84,688 84,688 84,688 0 The Council agreed to make provision to meet the cost of appealing Non Domestic Rates (NDR)
revaluations which will be imposed from 1st April 2017. It was agreed that £150,000 be earmarked
from the favourable 2016-17 outturn position to fund these appeals. The balance of £84,688  is still
required as NDR valuation appeals have been lodged but have not been heard yet. We will not know
the level of savings, and in turn the corresponding charge to us, until the appeals are concluded which
should be later on this year. Ryden are awaiting outcome of further citations which will incur fees.
84,688 0 0
012 Executive Director (Douglas Hendry) Commercial Services Site Investigation Works 21,013 21,013 21,013 0 For Site Investigation works in relation to Tweeddale Street Car Park, Oban and Oban Airport Business
Park to explore commercial opportunities to develop the sites and gain revenue income for Argyll and
Bute Council.  HUB North were instructed to procure contractors to undertake the site investigations
and work commenced in March 2020.   This is still ongoing.
21,013 0 0
013 Executive Director (Douglas Hendry) Commercial Services Catering and Cleaning Restructure
Costs
17,000 17,000 0 0 0 To support the catering and cleaning team restructure 17,000 0 0
014 Executive Director (Douglas Hendry) Education Education Transformation Fund 187,526 24,677 162,849 162,849 0 At the Council meeting on 27 February 2020, it was agreed to input £400k into Education Digital
Learning.  The additional funds have been spent in 20/21 and 21/22, as part of the ongoing
transformation work in the Education service, focussing on digital and virtual learning technology and
the development of learning clusters.  This will continue into 2022/23.
187,526 0
015 Executive Director (Douglas Hendry) Education Education Learning Estate Condition
Surveys
77,440 77,440 77,440 0 To fund the delivery of School Core Facts (SCF) compliant Condition Surveys for prioritised School
Buildings.
77,440 0 0
016 Executive Director (Douglas Hendry) Education Skype for Business for Education /
Digital Projects (Skype for Business)
10,000 10,000 10,000 0 To fund the initial capital costs for the implementation of Skype for Business for Education.  This will
bring the Education service in line with other council departments and will improve staff collaboration
and modernise school telephony to deliver the  service more efficiently and cost effectively.
A balance has been released back to the general fund because the rollout project is almost complete
with only £0.01m expected spend in 22/23.
10,000 0 0
017 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Education Purchasing Officers 210,000 210,000 90,000 120,000 The earmarked funds will be used to fund an education purchasing team within the Procurement
Service for two years.  The team will embed good procurement practice, train headteachers on current
procurement process requirements, develop spend plans that evidence best value.
90,000 120,000 0
018 Executive Director (Douglas Hendry) Legal and Regulatory
Services
NDR - One off contribution to 22/23
Budget
200,000 200,000 0 0 0 To fund one off operational saving CS04 agreed for the 2022/23 budget. 200,000 0 0
019 Executive Director (Douglas Hendry) Legal and Regulatory
Services
NPDO Schools Contract 166,000 166,000 0 0 0 To fund one off operational saving LRS01 agreed for the 2022/23 budget 166,000 0 0
Page 123

Page 124

Ref Department Service Description Opening Balance Budget
Drawdown
New earmarking
during 22-23
Remaining
Balance
Still to be drawn
down in 22-23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
020 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Transformation Agenda QIO 100,259 74,274 25,985 -4,015 30,000 Ongoing funding for the QIO post to lead the implementation of the service transformation
programme. The QIO will assist the Executive Director to deliver the Council’s transformation agenda
by developing, analysing and monitoring initiatives and projects which deliver the vision, values and
strategic objectives of the Council.
70,259 30,000 0
021 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Digital Projects: Hybrid Council
meetings
55,000 55,000 30,000 25,000 Per paper agreed at SMT October 2021 - allocation from Digital Projects (General Provision to be
allocated).  To fund the costs of livestreaming of Council meetings. 
30,000 25,000 0
022 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Councillor IT Equipment 65,000 65,000 65,000 0 To meet the cost of provision of IT equipment for all new Elected Members as a result of the Local
Government Election in May 2022.
65,000 0 0
023 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Debt Counselling & Welfare Rights 27,025 27,025 27,025 0 To meet the cost of a Debt Counselling and Welfare Rights Management System. 27,025 0 0
024 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Community Safety Partnership 16,000 16,000 16,000 0 To earmark the Community Safety Partnership funding received for 2021/22 to be used for Community
Safety Partnership purposes.
16,000 0 0
025 Executive Director (Kirsty Flanagan) Customer Support Services Microsoft 365 300,000 300,000 166,930 133,070 To be added to existing earmarked reserves to meet increasing MS365 licensing costs from 2022/23
onwards
166,930 133,070 0
026 Executive Director (Kirsty Flanagan) Customer Support Services Growing our Own and Modern
Apprentices
109,150 109,150 109,150 0 Funding earmarked to support trainee development and modern apprenticeship opportunities based
on priority workforce risk areas. These areas have been identified and proposals developed. £95,790 to
be spent in 22/23 and £13,360 to be spent in 23/24 to fund a graduate trainee and 3 apprentices to
deliver trainee development and modern apprenticeship opportunities
109,150 0 0
027 Executive Director (Kirsty Flanagan) Customer Support Services Security Operations Centre
Subscription
76,455 76,455 0 76,455 There is a requirement to pay for a 3-year subscription at £60,000 per annum with a cost pressure
being added to the ICT revenue budget to cover the costs from year 4 onwards.  There is unallocated
funding of £103,545 from the earmarking created at 2020/21 year end for 'Digital Projects', so the
earmarking request for 2021/22 year end is the balance of £76,455
16,455 60,000
028 Executive Director (Kirsty Flanagan) Customer Support Services Learning and Development 36,508 36,508 36,508 0 In order to maximise the opportunities and efficiencies of digital learning, this funding will be used to
support the extension of digital learning in order to deliver the Digital Learning Strategy, which was
approved in FQ4 20/21.
36,508 0 0
029 Executive Director (Kirsty Flanagan) Customer Support Services Implementation of Gaelic Language P 30,000 30,000 30,000 0 Agreed at Council Meeting February 2021.  Provision of funding for delivery and implementation of the
council’s Gaelic Language Plan in recognition of the contribution that Gaelic makes to economic growth
and to the tourism sector, and to enable delivery of key activities within the plan which currently
receive no revenue funding.
30,000 0 0
030 Executive Director (Kirsty Flanagan) Customer Support Services Establishing HR Service Centre 30,000 30,000 18,000 12,000 To facilitate the implementation of technical efficiency improvements and new processes 18,000 12,000 0
031 Executive Director (Kirsty Flanagan) Customer Support Services Business Development Training 27,601 27,601 27,601 0 This budget is funding ongoing leadership development, coaching, action learning sets and
commissioned training including Priority Management.
27,601 0 0
032 Executive Director (Kirsty Flanagan) Development and Economic Oban TIF (Tax Incremental Financing) 709,700 709,700 116,000 593,700 Will be used to fund the TIF Programme office for a further 3 years as well as the programme office for
Rural Growth Deal beyond the funding that was agreed at Council for this in February 2021.
116,000 116,000 477,700
033 Executive Director (Kirsty Flanagan) Development and Economic Strategic Events & Festivals 115,764 115,764 115,764 0 At the Council meeting on 25 February 21, a decision was taken to agree £90k funding for Events and
Festivals for 22-23, in order that the application process can commence during 21-22 and that this
agreed figure be augmented by any underspend remaining from the 20-21 financial year.  At 24
February 22, decision made to agree £90k for 23-24, in order that the application process can
commence during 22-23 and that this agreed figure be augmented by any underspend remaining from
the 21-22 financial year
115,764 0
034 Executive Director (Kirsty Flanagan) Development and Economic Island Post 50,461 50,461 50,461 0 To fund a temporary post at LGE11 to assist with the National Islands Plan Implementation Route Map
2020-2025
50,461 0 0
035 Executive Director (Kirsty Flanagan) Development and Economic Royal National Mod 40,000 40,000 20,000 20,000 One off funding allocation for the Royal National Mod agreed as part of the budget setting process for
2019-20. Grant contract issued. Proposed payment of £20k per annum starting 2020/21  (2023/24 final
payment of £20k)
20,000 20,000 0
036 Executive Director (Kirsty Flanagan) Roads & Infrastructure Waste Variation Monies 1,492,997 1,492,997 640,000 852,997 This would be used to fund/part-fund various waste infrastructure projects that will support the
council’s compliance with the 2025 ban on the Landfill of Biodegradable Municipal Waste, including
the development of landfill cell construction works at Gartbreck.
640,000 426,000 426,997
037 Executive Director (Kirsty Flanagan) Roads & Infrastructure Climate Change 500,000 500,000 500,000 0 At the Council meeting on 27 February 20, it was agreed to input £500k budget to mitigate the impacts
of weather related damage and climate change with specific emphasis on gully cleaning and drainage
improvements.  Spend has been delayed due to COVID and the intention is to spend the funds on 2
Gully Motors plus staff over next 2 years. Vehicles are on order and expected to be delivered in early
2022-23.
500,000 0
038 Executive Director (Kirsty Flanagan) Roads & Infrastructure 3G pitches / Tarbert Sports Pitches 427,286 427,286 89,373 337,913 In November 2018, the Council agreed to a maintenance funding package to be progressed for a
number of 3G pitches including Tarbert. This funding will provide an estimated 6.5 years’ worth of
ongoing maintenance up to 2025-26.
89,373 337,913 0
039 Executive Director (Kirsty Flanagan) Roads & Infrastructure Green Transport Initiatives 400,000 400,000 400,000 0 At the Council meeting on 27 February 20, it was agreed to input £400k in Green transport, investment
in footway and cycle path maintenance supporting the healthy wellbeing and green agenda.  Spend
has been delayed due to COVID and this will be taken forward in 21-22. £260k Footways
Reconstruction programme now agreed across the four areas, £140k Ardrishaig North Project.
400,000 0
040 Executive Director (Kirsty Flanagan) Roads & Infrastructure Waste Strategy 363,000 363,000 125,000 238,000 To fund/part-fund various waste projects that will support the council's compliance with the 2025 ban
on the Landfill of Biodegradable Municipal Waste.
125,000 119,000 119,000
041 Executive Director (Kirsty Flanagan) Roads & Infrastructure Waste Management 256,753 256,753 256,753 0 Will be used towards long term waste management strategy/model, including but not limited to
scoping work for the creating of a waste transfer station at Helensburgh.
256,753 0 0
042 Executive Director (Kirsty Flanagan) Roads & Infrastructure Replacement Signage and Bins 135,366 135,366 135,366 0 Replacing key road signage. This will help to reduce future budget pressures for replacement of signs
and would also help to enhance the streetscape and general appearance of the area.  The bulk of Road
signs have been delivered and installation is now in progress and will be completed during 2022-23.
135,366 0 0
043 Executive Director (Kirsty Flanagan) Roads & Infrastructure Kintyre Recycling Redundancy Costs 36,000 36,000 36,000 0 To fund redundancy costs associated with Kintyre Recycling. 36,000 0 0
044 Executive Director (Kirsty Flanagan) Roads & Infrastructure Amenity Services introduction of man  28,099 28,099 28,099 0 Delay with introduction of amenity time recording system, spend unlikely to be incurred until 2022-23
for handheld devices and software.
28,099 0 0
045 Non Departmental Non Departmental Underwriting development of Rothes 1,000,000 1,000,000 1,000,000 0 Funding to meet additional costs identified as necessary for the refurbishment of Rothesay Pavilion. 1,000,000 0 0
046 Non Departmental Non Departmental Loans Fund 385,279 385,279 385,279 0 At the Council Budget meeting on 24 February 2022, Saving FS01, a Loans Fund
Management/Operational saving for 22/23 budget of £0.500m was agreed with at least £0.200m to
come from underspends in 21/22.  The underspend position for 21/22 is £0.385m and this has to be
earmarked to help offset the saving. 
385,279 0 0
047 Non Departmental Non Departmental Utilities 283,000 283,000 283,000 0 To contribute towards the expected adverse impact on the 2022/23 budget of utility costs inflation as
per Budget Pack
283,000 0 0
Page 124

Page 125

Ref Department Service Description Opening Balance Budget
Drawdown
New earmarking
during 22-23
Remaining
Balance
Still to be drawn
down in 22-23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
048 Non Departmental Non Departmental Digital Projects (General Provision to  103,545 103,545 103,545 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063mand a general provision still to be allocated £0.189m. 
Further allocation to Hybrid Council Meetings agreed October 2021 (£0.085m).
There is a proposal for 2021-22 year end to use the balance of this earmarking towards the Security
Operations Centre Subscription unspent budget request - per Appendix 2.1l
103,545 0 0
049 Non Departmental Non Departmental Community Resilience Fund 76,447 76,447 76,447 0 Fund established in 2012/13 to be spent over more than one year. Fund reduced at the Council
meeting on 11 February 2016
76,447 0 0
050 Non Departmental / Chief Executive's Across Services / Chief Execu Information Management (Balance of 209,844 209,844 209,844 0 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV Review. 
The planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k,
document management and workflow system for Planning, Building Standards and Environmental
Health £77k and a balance of funding to explore information management solutions in a strategic and
coherent way £209k
209,844 0 0
051 Non Departmental / Executive Directo  Across Services / Commercia Information Management (Estates Su 12,697 12,697 12,697 0 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV Review. 
The planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k,
document management and workflow system for Planning, Building Standards and Environmental
Health £77k and a balance of funding to explore information management solutions in a strategic and
coherent way £209k
12,697 0 0
052 Non Departmental / Executive Directo  Across Services / Legal and R Information Management (Digitalisat   92,000 92,000 61,000 31,000 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV Review. 
The planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k (delay on
spending due to COVID-19), document management and workflow system for Planning, Building
Standards and Environmental Health £77k and a balance of funding to explore information
management solutions in a strategic and coherent way £209k
61,000 31,000 0
053 Non Departmental / Executive Directo  Across Services / Customer S Digital Projects (Digital Customer Eng 73,000 73,000 73,000 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063m and a general provision still to be allocated £0.189m
73,000 0 0
054 Non Departmental / Executive Directo  Across Services / Customer S Digital Projects (Increase in Schools B 63,455 63,455 63,455 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063m and a general provision still to be allocated £0.189m
63,455 0 0
055 Non Departmental / Executive Directo  Across Services / Customer S Digital Projects (Replacement Learnin  11,470 11,470 11,470 0 To deliver a number of Digital Service Transformation Projects, specifically in Education and Customer
Support Services, but also to reserve a further amount to support priority digital transformation
projects identified in Departmental ICT programmes, that have not yet started due to resource
constraints.  The specific projects include: Supply Staff Booking System £0.035m, Skype for Business
(for Education) £0.030m, Enhancing Curriculum Choice and Equity of Provision £0.080m, Digital
Customer Engagement Developments £0.073m, Replacement of Learning Management System
£0.030m, Increase in Schools Bandwidth £0.063m and a general provision still to be allocated £0.189m
11,470 0 0
056 Non Departmental / Executive Directo  Across Services / Developme   Information Management (Document          57,491 57,491 57,491 0 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV Review. 
The planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k,
document management and workflow system for Planning, Building Standards and Environmental
Health £77k and a balance of funding to explore information management solutions in a strategic and
coherent way £209k
57,491 0 0
10,458,934 634,543 0 9,824,391 6,941,661 2,882,730 7,576,204 1,785,033 1,097,697
Page 125

Page 126

APPENDIX 2
COVID Earmarkings
As at 31 August 2022
Ref Department Service Description Opening Balance Budget
Drawdown
Released back to
General Fund
New earmarking
during 22-23
Remaining
Balance
Still to be
drawndown in 22-
23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
001 Chief Executive's Unit Community Planning Community Planning - temp post to
support communities
55,000 55,000 55,000 0 As agreed at Policy & Resources committee on 9 December 2021, allocation of £0.055m to a post to
support the economic and social recovery together with the building back stronger themes.
55,000 0 0
002 Chief Executive's Unit Community Planning COVID-19 - Test and Protect Support 44,047 10,000 34,047 34,047 0 Funding provided in relation to the Local Self-Isolation Assistance Service.  The Community Planning
and Development Team will work with community groups to support their community response and
resiliency to Test and Protect and COVID-19 impacts
44,047 0 0
003 Chief Executive's Unit Financial Services LACER Fund 797,720 797,720 797,720 0 The Council meeting on 28 April 2022, it was agreed that Local Authority Covid Economic Recovery
(LACER) Funding is to be used to distribute Scotland Loves Local cards to CTR recipients. This will take
place in June 2022 giving Economic Development time to encourage the Co-op to sign up to accept the
cards.
797,720 0 0
004 Chief Executive's Unit Financial Services Housing Benefits Private 673,867 673,867 673,867 0 Specific funding allocation for DHP to support tenants financially affected by the COVID-19 outbreak to
sustain their tenancies.  It is expected there will continue to be pressure on this budget going into 22-
23
673,867 0 0
005 Chief Executive's Unit Financial Services Flexible Food Fund 510,573 134,285 376,288 376,288 0 Financial Insecurity funding from Scottish Government routed into the Argyll and Bute Flexible Food
Fund (ABFFF) is aimed at tackling financial insecurity for adults and families across Argyll and Bute. 
ABFFF offers financial support and wider confidential professional help to anyone suffering hardship.
Working in partnership with the Community Food Forum, Bute Advice Centre and ALIenergy,
households with low incomes and no access to cash savings can apply for immediate financial support. 
The Fund will help support daily living expenses.  If the claimant engages with these services, a second
payment will be made to contribute to a further months daily living expenses.  In the period from 10
January 2021 to 30 April 2022 client gain in extra benefits income for families was £1.45 million with
1,090 families had been supported. The project has been extended to 31 March 2023 and this money
will be used to support it.
510,573 0 0
006 Chief Executive's Unit Financial Services Flexible Funding for Supporting
People while at Tier 4 COVID
167,983 42,961 125,022 125,022 0 Funding to strengthen local authority responses to meet emerging needs and support people in their
communities struggling with the restrictions and guidance at all protection levels, particularly those at
risk through health and social inequalities; this support could cover the same types of support
currently delivered including information and advice, access to food and medicines, and practical and
emotional support; and, administration costs to support delivery (e.g. strengthening the National
Assistance Helpline) and liaison and co-ordination with 3rd sector. It will be for Local Government to
use this funding flexibly for this purpose. 
167,983 0 0
007 Chief Executive's Unit Financial Services Self Isolated Support Grant 16,000 16,000 16,000 0 Unspent admin funding for processing Self isolation Support Grants. Monies will be fully utilised in
2022/2023 to support the further administration of the grant until 31 March 2023.
16,000 0 0
008 Chief Executive's Unit Financial Services Test and Protect Extension 9,929 9,929 9,929 0 Funding provided in relation to the Local Self-Isolation Assistance Service.  This will be used to support
the recruitment of 0.5FTE LGE6 temp post to assist with call volumes in the Scottish Welfare Fund
team in 2022/23
9,929 0 0
009 Executive Director (Douglas Hendry) Education Logistics Funding - Safe Opening of
Schools
940,605 15,117 925,488 925,488 0 SG Funding to ensure the safe opening and operation of schools.  Includes transport, PPE, Cleaning and
expansion of estate.
940,605 0 0
010 Executive Director (Douglas Hendry) Education Additional Teaching/Support in
Schools/Digital Devices/Family
Home Learning Support Fund -
£45m Grant - £45m
488,310 488,310 0 0 0 Continuation of funding for additional staffing, teachers, support staff, additional devices for pupils
and additional family /home learning programmes.
488,310 0 0
011 Executive Director (Douglas Hendry) Education COVID 19 - Education Recovery -
Additional Staff in School and ELC
settings
373,346 373,346 0 0 0 To employ a variety of school staff to meet the needs of children and young people in their local areas
and ensure that levels of teaching and support staff in schools can be maintained in the 2021-22
academic year.  Funding will also be used to support the transition from ELC to primary school.
373,346 0 0
012 Executive Director (Douglas Hendry) Education Education to Support Young People 321,816 243,124 78,692 19,452 59,240 As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.600m.  Agrees
to fund a package of measures to boost the wellbeing and build back the resilience of young people, in
particular those most vulnerable, following the Covid-19 pandemic, including counselling and increased
provision of childcare for children under three. Notes that the Scottish Government is yet to confirm
details of funding for similar initiatives and, should our investment in children’s wellbeing qualify for
this funding, the balance will be re-allocated to the Recovery and Renewal Fund. 
262,576 59,240 0
013 Executive Director (Douglas Hendry) Education Recruitment of Additional Teachers
and Support Staff in Schools
136,715 136,715 0 0 0 Fund additional teachers and support staff. 136,715 0 0
014 Executive Director (Douglas Hendry) Education EDU - Community Mental Health
and Wellbeing Support to Children
and Young People - Pandemic
Funding
49,756 49,756 49,756 0 Scottish Government/COSLA Initiative to support the work under the Children and Young People's
Mental Health and Wellbeing Programme grant split in 2020-21 with £183,750 of the fund utilised by
local collaborative partnerships for supporting children, families and carers through the pandemic.  The
Scottish Government has agreed for the balance to be spent in 2022/23.
49,756 0 0
015 Executive Director (Douglas Hendry) Legal and Regulatory
Services
Welfare Rights Support 172,000 172,000 172,000 0 As agreed at the Council Meeting on 25 February 2021 - an allocation of £0.172m.  As part of our focus
on Improving Opportunities for People and Communities, agrees to provide additional resources to
proactively support people experiencing poverty and hardship, by investing in two additional Welfare
Rights support staff for two years.
172,000 0 0
016 Executive Director (Douglas Hendry) Legal and Regulatory
Services
LACER Funding - Advice Services 130,000 130,000 0 0 0 Local Authority COVID Economic Recovery (LACER) Funding for Welfare Rights - ALI Energy, Bute
Advice, Citizens Advice
130,000 0 0
017 Executive Director (Kirsty Flanagan) Customer Support Services Self Isolated Support / Self Isolated
Support Grant (HR)
115,000 115,000 115,000 0 These were monies that were provided by Scotgov to fund additional overtime and resources for
Shielding/Caring for People and Test and Protect activities, however low infection rates and therefore
demand in A&B meant that this was not required in 2020/21 or 2021-22.
The 2021-22  funding of £43,000 will be  used for Recovery related activities including the recruitment
of a Temporary Additional Web Developer to implement the improvements identified by customers in
the Customer Engagement Consultation and to mainstream the Coronavirus page content back in to
Business as usual. Another portion will be used to fund the Digital Receptionist solution as part of safe
re-opening of offices. 
The 2021-22 funding of £72,000 will be used to fund consultancy and development of RPA (robotic
process automation) software which will build automation within HR workflows and processes. This
will improve efficiency and accuracy.
115,000 0 0
018 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Staycation and Marketing Argyll and
Bute
592,013 106,368 485,645 485,645 0 As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.800m.   This will
include provision of additional waste disposal facilities and other facilities that will be informed by the
Motorhome and Informal Camping Survey.
592,013 0 0
Page 126

Page 127

Ref Department Service Description Opening Balance Budget
Drawdown
Released back to
General Fund
New earmarking
during 22-23
Remaining
Balance
Still to be
drawndown in 22-
23
Planned to spend
in future years
Plans for Use Amount
Planned to be
Spent in 2022-
23
Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent from
2023-24
onwards
019 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Tackling Digital Exclusion Top-Up
Fund
250,000 250,000 250,000 0 As agreed at the Council Meeting on 25 February 2021.  Establishes the Tackling Digital Exclusion Top
Up Fund to support communities and in some cases individuals that are missing out on national
programmes due to logistics and economies of scale.  While vouchers are available from the UK and
Scottish Governments in some cases these do not cover the full cost of infrastructure builds.
250,000 0 0
020 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (Small Business
Development Grant)
200,000 200,000 200,000 0 Local Authority COVID Economic Recovery Fund grant.  This funding will provide funding of between
£500 and £5,000 to help existing micro and small businesses to improve their resilience or growth via
projects to implement green initiatives, implement digital development, implement marketing
improvements and improve efficiency/innovation.
200,000 0 0
021 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (Sector Support
Grant)
150,000 150,000 150,000 0 Local Authority COVID Economic Recovery Fund grant.  This will provide funding, either part of the
small  business development grant or standalone, to help micros and small business to implement
projects that contribute to the sector as well as benefitting the business, for example: Tourism and
hospitality, food and drink or retail.  With option to provide additional business support to hard hit
areas including Bute and Kintyre where unemployment remains higher than average - support via
specialist advice, locally tailored grants to meet local priorities and targeted marketing activity.
150,000 0 0
022 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (New Enterprise
Support Grant)
120,000 120,000 120,000 0 Local Authority COVID Economic Recovery Fund grant.  This funding would provide £3,000 grants to
help new businesses start up and establish.
120,000 0 0
023 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Staycation Investment per budget
pack February 22
100,000 100,000 100,000 0 As agreed at Council on 24 February 2022, Staycation investment £0.100m.  Augments the 2021/22
£0.5m staycation initiative with an additional investment of £100k, including support for community
groups and partners in the provision of facilities which can support increasing staycation visitor
numbers during the 2022/23 season.
100,000 0 0
024 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Economic Development - temp post
to support economic recovery
55,000 55,000 55,000 0 As agreed at Policy & Resources committee on 9 December 2021, allocation of £0.055m to a post to
support the economic and social recovery together with the building back stronger themes.
55,000 0 0
025 Executive Director (Kirsty Flanagan) Development and
Economic Growth
EH Covid Posts 41,145 41,145 41,145 0 Funding for 2 posts for 2 years and not recruited until late 20-21 41,145 0 0
026 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (Shop Local) 40,000 40,000 40,000 0 Local Authority COVID Economic Recovery Fund grant.  This funding would provide funding to continue
the Shop Local scheme into 2022-23 and 2023-14, buying additional cards and allow the cards to gather
momentum and support local businesses.
40,000 0 0
027 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Tenant Hardship Fund 30,000 30,000 30,000 0 Grant received from Scottish Government to support tenants suffering hardship due to COVID-19. 
Claims have been made and Housing are in the process of paying these out and all claims will be
settled during 2022-23.
30,000 0 0
028 Executive Director (Kirsty Flanagan) Development and
Economic Growth
LACER Funding (Gypsy Travellers) 10,000 10,000 10,000 0 Local Authority COVID Economic Recovery Fund grant.  This funding would pay for MECOPP (Minority
Ethnic Carers of People Project) to engage with the Gypsy Travellers community on the important
subject of the cost of living increases, fuel poverty and the impact of factors such as their remote rural
locations and the facilities available to them for everyday living  have on their livelihoods
10,000 0 0
029 Non Departmental Across Departments COVID Cost Pressures Beyond
2021/22
370,000 370,000 370,000 0 As agreed at the Council Meeting on 25 February 2021 (£2.5m)  with the value reduced to £0.370m
based on more up to date projections at year end 2021-22.  Allocation of COVID funding to projected
22/23 Revenue Cost Pressures
370,000 0 0
030 Non Departmental Non Departmental Recovery and Renewal Fund 1,547,000 1,547,000 1,547,000 0 As agreed at Council on 24 February 2022, Recovery and Renewal Fund £1.547m.  This is provision for
future recovery, regeneration and renewal, as well as any future pressures which may arise following
the Covid-19 pandemic through a dedicated Recovery and Renewal Fund.  Proposals for use of this
fund to be brought forward by officers to the Policy and Resources Committee. To include in the first
instance options for maximising Argyll and Bute’s potential as a green, connected staycation
destination of choice, requesting that officers bring to the Environment, Development and
Infrastructure Committee a report on use of external funding sources and other opportunities for
improving the electric vehicle charging network.
1,547,000 0 0
031 Non Departmental Non Departmental Unallocated Admin Support Grant 411,285 411,285 411,285 0 Funding to support the delivery of the Business Grants to local businesses, partially used during 20/21
and 21/22 but a balance remains to be carried forward and used in future years
411,285 0 0
032 Non Departmental Non Departmental Capital pressure 257,000 257,000 257,000 0 Pressure identified on the 20-21 COSLA COVID costs spreadsheets - requires to be earmarked to be
drawn down when required against the Capital Plan
257,000 0 0
033 Non Departmental Non Departmental Levelling up Fund bids per P&R
February 22
150,000 150,000 150,000 0 As agreed at Policy & Resources committee on 17 February 2022, an allocation of  up to £0.150m to
support Levelling Up Fund bids
150,000 0 0
034 Non Departmental Non Departmental CHARTS per budget pack February
22
75,000 50,000 25,000 25,000 0 As agreed at Council on 24 February 2022, investment in CHARTS £0.075m.  To support the
organisation in delivering targeted support, in communities, to the culture, arts and heritage sector as
part of its plans to contribute to overall economic recovery.
75,000 0 0
035 Non Departmental Non Departmental CHARTS 7,000 7,000 0 0 0 As agreed at the Council Meeting on 25 February 2021.  Allocation of COVID funding to CHARTS
£0.067m, with the balance of £0.007m being carried to 2022/23.  The allocation is to ensure that Argyll
and Bute’s culture, heritage and arts sector can make a contribution to our overall recovery and
renewal.
7,000 0 0
9,408,110 1,737,226 0 0 7,670,884 7,611,644 59,240 9,348,870 59,240 0
Page 127

Page 128

This page is intentionally left blank

Page 129

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 13 OCTOBER 2022
BUDGET OUTLOOK 2023-24 TO 2027-28  
1. EXECUTIVE SUMMARY 
1.1 This report provides an update to the budget outlook 2023-24 to 2027-28,
reported to the Policy and Resources Committee on 11 August 2022. 
1.2 The estimates within the report are based on the mid-range scenario with best
and worst case scenarios noted in Appendix 1. 
1.3  The assumptions in respect of future years Scottish Government funding
remain unchanged from those reported on 16 June 2022 and ranges between
0.5% reduction (best case) and 1.5% reduction (worst case) with a mid-range
reduction of 1.0%.  
1.4 There are no changes to my previous assumptions around the growth in
Council Tax. For 2023-24 the Council tax base has been assumed to grow by
1% in the worst case scenario, 1.5% in the mid-range scenario and 2% in the
best case. In future years this then drops down to 0.25% in the worst case
scenario, 0.5% in the mid-range scenario and 0.75% in the best case. 
1.5  Since the budget outlook was last reported to Policy and Resources Committee
on 11 August 2022 there has been a change to the base budget in relation to
the 2022-23 pay award. Negotiations are now at an advanced stage with the
current proposal being a 5% undifferentiated pay offer, which includes a £3,000
cap for those earning above £60,000 based on a 37 hour week, and a
commitment to ensure that everyone receives an increase of at least £1,925 or
£2,000 depending on spinal column point. This results in additional costs
totalling £5.852m. The Scottish Government has agreed to provide an
additional £140m of recurring resource from 2022-23 to support the 5% pay
offer and a further £120.6m of capital funding in 2022-23 and 2023-24 which
will be baselined as General Revenue Grant from 2024-25 onwards to ensure
that everyone receives an increase of at least £1,925 or £2,000. The net impact
of this is an increase to the baseline of £2.112m in 2022-23. 
1.6 As a result of the above there have been changes made to the assumptions in
respect of employee costs for Council services as follows:
 Pay inflation for 2023-24 has been updated to 3.5% within the mid-range
scenario based on the current 2022-23 pay negotiations which require the
Council to fund a 3.5% increase in the current year. The best case and
worst case scenarios remain at 2% and 5% respectively.
 Pay inflation for 2024-25 onwards reverts back to 2% in the mid-range and
best case scenario, and 5% in the worst case scenario as previously
reported.
Page 129 Agenda Item 5

Page 130

 Increments between £0.345m and £0.690m with mid-range £0.690m remain
as previously reported. 
1.7 For non-pay inflation, only unavoidable/inescapable inflation has been built in
for the best case and mid-range scenarios with a contingency of £0.250m built
into the mid-range. A further general inflationary increase has been built into
the worst case scenario. The estimates for non-pay inflation have increased by
£0.198m with the main increases being utilities. 
1.8 There are a number of cost and demand pressures for Council services built
into each scenario. There have been no changes to these pressures since the
last report on 11 August 2022. 
1.9 In addition to the identified cost and demand pressures an allowance for
unidentified cost and demand pressures has been included in mid-range and
worst case scenarios of between £0.250m and £0.500m per year. 
1.10 There will be a political decision to be made as to the future allocation to the
Health and Social Care Partnership.  As part of the budget agreed in February
2022, indicative allocations for 2023-24 to 2024-25 were agreed on the basis of
a flat cash allocation. In the budget outlook I have assumed flat cash
allocations across all three scenarios. 
1.11 At this stage a 3% reduction to the Live Argyll Management fee has been
included within the estimates.  At the 2022-23 budget setting meeting in
February 2022 it was agreed to defer the proposed 3% reduction to the Live
Argyll management fee until 2023-24 subject to any future budget decisions. It
was agreed that management would engage in early discussions with Live
Argyll in relation to future approach to support effective longer term financial
planning. 
1.12 The budget gap in the mid-range scenario after allowing for the current base
commitments, employee adjustments, non-pay inflation and cost and demand
pressures and not factoring in any previous savings decisions or future
potential options is an estimated gap over the five year period of £51.302m with
a gap of £14.836m in 2023-24. 
1.13 The measures to balance the budget over the next five years are as follows:
 Proposed increase to fees and charges of between 3% and 9% (6% mid-
range).
 3% reduction to the Live Argyll Management Fee.
 Management/operational savings agreed by Council in February 2022. 
 Policy savings already agreed by Council in February 2022.
 Proposed increase to Council Tax (3% in all scenarios).
 Emerging savings options as part of 2023-24 budget setting process as
detailed at 4.8.3. 
1.14 In the mid-range scenario, the revised budget gap estimated over the five year
period 2023-24 to 2027-28 is £33.011m with a gap of £7.284m in 2023-24.   
Page 130

Page 131

1.15 The budget gap in the best case scenario over the five years is £17.851m with
a gap of £2.177m in 2023-24 and in the worst case scenario, the budget gap
over the five years is £75.206m with a gap of £13.560m in 2023-24.  A
summary of all three scenarios is included within Appendix 1. 
1.16 It is recommended that the Policy and Resources Committee consider the
current estimated budget outlook position for the period 2023-24 to 2027-28. 
Page 131

Page 132

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 13 OCTOBER 2022
BUDGET OUTLOOK 2023-24 TO 2027-28  
2. INTRODUCTION 
2.1 This report provides an update to the budget outlook 2023-24 to 2027-28, reported
to the Policy and Resources Committee on 11 August 2022. 
2.2 The budget outlook has been prepared using three different scenarios, best case,
worst case and mid-range.  Relatively small variations in assumptions can lead to
fairly significant changes in the outcome.  In the paragraphs that follow, the mid-
range outlook is shown, however, all three scenarios are detailed within Appendix
1. 
3.  RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee consider the current
estimated budget outlook position for the period 2023-24 to 2027-28. 
4. DETAIL 
4.1 Funding 
Scottish Government Finance Settlement 
4.1.1 There are no changes to my previous assumptions around the level of future
Scottish Government funding.  In my report in June, I advised that the Resource
Spending review indicated that Local Government is expected to receive a flat
cash settlement up to 2026-27.  The flat cash position is at portfolio level and does
not include any transfers to Local Government from other portfolios in-year.  
These transfers are likely not be confirmed until December 2022 and that, along
with the fact that due to our declining population our settlement is usually worse
that the average, lead me to the funding assumptions built into the outlook.  The
funding assumptions range between a 0.5% reduction (best case) and 1.5%
(worst case) with a mid-range reduction of 1.0%.   
4.1.2 The table below summarises the mid-range scenario estimates expressed in
percentage terms and monetary value. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
% Change to Funding -1.0% -1.0% -1.0% -1.0% -1.0%
Estimated SG Funding
Reduction
(2,016) (2,143) (2,122) (2,101) (2,080)
Estimated SG Funding 214,330 212,187 210,065 207,964 205,884 
Page 132

Page 133

Council Tax 
4.1.3 The Council Tax budget for 2022-23 was set at £55.262m which reflected a 3%
inflation increase and 1.5% growth in the Council Tax base as agreed by the
Council on 24 February 2022. 
4.1.4 There are no changes to my previous assumptions around the growth in Council
Tax. It has been assumed that a 1.5% growth in the mid-range (1% in worst case
and 2% in best case) should be maintained for 2023-24 with the drop down to
0.5% in the mid-range in 2024-25. 
4.1.5 Within this report, I will present the budget gap, prior to any Member based
decisions and therefore at this stage in the report, the Council tax base is
assumed to remain at the same level as 2022-23.   
4.1.6 The table below summarises the estimated total funding in the mid-range
scenario. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Estimated SG Funding 214,330 212,187 210,065 207,964 205,884
Council Tax Base 55,262 55,262 55,262 55,262 55,262
Council Tax Growth 829 1,109 1,391 1,674 1,959
Total Estimated
Funding
270,421 268,558 266,718 264,900 263,105 
4.2 Base Budget 
4.2.1 
4.2.2 
The 2022-23 budget approved by Council on 24 February 2022 was £262.812m.   
Since the budget outlook was last reported to Policy and Resources Committee on
11 August 2022 there has been a change to the base budget in relation to the
2022-23 pay award. Negotiations are now at an advanced stage with the current
proposal being a 5% undifferentiated pay offer, which includes a £3,000 cap for
those earning above £60,000 based on a 37 hour week, and a commitment to
ensure that everyone receives an increase of at least £1,925 or £2,000 depending
on spinal column point. This results in additional costs totalling £5.852m. The
Scottish Government has agreed to provide an additional £140m of recurring
resource from 2022-23 to support the 5% pay offer and a further £120.6m of
capital funding in 2022-23 and 2023-24 which will be baselined as General
Revenue Grant from 2024-25 onwards to ensure that everyone receives an
increase of at least £1,925 or £2,000. The net impact of this is an increase to the
baseline of £2.112m in 2022-23. Once this recurring funding has been confirmed
by Scottish Government the funding and cost elements of this adjustment will be
identified independently within the budget outlook as opposed to a net adjustment
figure. 
4.2.3 For future years, there are adjustments required to the base budget from decisions
by Council on 24 February 2022 and other adjustments, including the pay award
detailed in paragraph 4.2.2, as noted in the table below: 
Page 133

Page 134

2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Base Budget 2022-23 262,812 262,812 262,812 262,812 262,812
Additional Funding in
Finance Order (see
paragraph 4.1.4)
6,315 6,315 6,315 6,315 6,315
Additional budget required
in relation to the Teachers
Pay Settlement 2021-22
(see paragraph 4.1.5)
121 121 121 121 121
Adjust for repayment of
Loans Fund Principal
Repayment Holiday
162 170 179 188 197
Remove one off 2022-23
Election costs
(350) (350) (350) (350) (350)
Remove one off 2022-23
Management/Operational
savings
2,174 2,182 2,182 2,182 2,182
2022-23 Pay Award 2,112 2,112 2,112 2,112 2,112
Revised Base Budget 273,346 273,362 273,371 273,380 273,389 
4.3 Employee Cost Changes 
Pay Award 
4.3.1  As detailed in paragraph 4.2.2 negotiations regarding the pay award for 2022-23
are at an advanced stage and the base budget has been adjusted accordingly by
£2.112m. 
4.3.2 The current proposal is based on a 5% undifferentiated pay offer, which includes a
£3,000 cap for those earning above £60,000 based on a 37 hour week, and a
commitment to ensure that everyone receives an increase of at least £1,925 or
£2,000 depending on spinal column point. The Council is required to fund a further
1.5% of the increase having already built 2% into the previously reported budget
outlook. Based on this, the budget outlook has been updated to assume an
increase of 3.5% again in 2023-24 as it is likely that the cost of living crisis will
continue into next year and there will continue to be a requirement to increase the
pay offer above the 2% that was previously estimated. This results in an additional
pressure in 2023-24 of £2.234m. 
4.3.3 For future years beyond 2023-24, the pay assumption reverts back to 2% in both
the mid-range and the best case, reflecting that current indications are that
inflation rates should begin to fall during 2023-24 and also that 2% is deemed to
be affordable. For scenario purposes, 5% has been built into the worst case.   
Increments 
4.3.5 There are no changes to my previous assumption around the cost of employee
increments. It has been assumed that for future years, the best case is half of the
previous year cost, for mid-range and worst case, it will be equal to the cost in
Page 134

Page 135

2022-23 (£0.690m).   
4.3.6 The table below summarises the employee cost increases in the mid-range
scenario for Council services.  The employee cost increases relating to Social
Work within the Health and Social Care Partnership are summarised within
paragraph 4.6.3. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Pay Award 5,234 8,339 11,506 14,737 18,032
Increments 690 1,380 2,070 2,760 3,450
Total Employee Cost
Changes
5,924 9,719 13,576 17,497 21,482 
4.4 Non-Pay Inflation 
4.4.1 Over the last few years, the Council have only included non-pay inflation within the
budget where it was deemed to be unavoidable or inescapable.  In terms of the
budget outlook, only unavoidable/inescapable non-pay inflation is built into the
best case and mid-range scenarios with a general inflation allowance over and
above this built into the worst case.   
4.4.2 Given the current instability around inflation rates officers continue to review areas
of non-pay inflation of significant value and volatility on an ongoing basis.  The
principle of only budgeting for unavoidable/inescapable remains, however, it has
to be noted that in this current financial climate, some budgets with no inflation
allowed for are now stretched beyond the point of containing the cost within
budget and therefore the budget will now buy less than what it used to be able to
buy (so in effect, we will see some cuts as a result). 
4.4.3 When creating a budget outlook for future years, there is a risk that inflation
assumptions could change during the year.  Due to the current inflation
uncertainty, it would be prudent to include a contingency for other inflation
increases not included in the calculations.  A contingency allowance of £0.500m is
included within the worst case scenario and a £0.250m allowance included within
the mid-range scenario each year.  No contingency is included within the best
case scenario.  This contingency will either be required, reduced or removed to
reflect changing circumstances before the 2023-24 budget process.   
4.4.4  The table below summarises the non-pay inflation increases in the mid-range
scenario for Council services since last reported on 11 August 2022 with more
detail available in Appendix 2.  The non-pay inflation increases relating to Social
Work within the Health and Social Care Partnership are summarised within
paragraph 4.6.3. 
Inflation Category 2023-24
Previous
estimates
£000
2023-24
Updated
estimates
£000
Increase
£000
Utilities - Electricity, Gas, Oil, Water 1,190 1,314 124
Page 135

Page 136

Street Lighting Electricity 116 116 0
Vehicle Fuel 60 60 0
Central Repairs - Outside Contractors 66 66 0
Waste PPP/Landfill Tax 502 502 0
NPDO/HUB Schools 1,034 1,074 40
Community Pool Subsidies 65 70 5
Residential Schools 91 90 (1)
Pre-Primary Partner Providers 181 181 0
ICT 123 155 32
Catering Purchases and Milk 309 306 (3)
Insurance 146 146 0
Bitumen – Roads 158 159 1
Contingency for unidentified/insufficient
inflation estimate
250 250 0
Total 4,291 4,489 198 
4.4.6 The inflation for years 2024-25 to 2027-28 is noted in the table below and is based
on future years estimates of inflation at this point it time.  It may be that the
inflation could rise to a peak over the next couple of years and then fall again and
this would alter the estimates in the table below, however, this is very difficult to
predict and the estimates will be kept under review.   
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Unavoidable/Inescapable 7,206 10,124 13,259 16,628
Total Non-Pay Inflation 7,206 10,124 13,259 16,628 
4.5 Cost and Demand Pressures 
4.5.1  Over the last few years, services have worked on the basis of having to contain
any cost and demand pressures within current resources, however, there are a
number of cost and demand pressures already identified for Council services
which were reported as part of the budget in February 2022.  Since the Policy and
Resources Committee on 11 August 2022 there have been no further changes to
the cost and demand pressures reported at that time. 
Officers are currently assessing the budget required in respect of the provision for
1140 hours.  The Scottish Government reduced the funding for this area of spend
in 2022-23 and it is likely that this may create a cost pressure for future years. 
The level of the cost pressure has not been quantified as yet and will be updated
within a future budget outlook.   
4.5.2  As with inflation, when creating a budget outlook beyond one year, there is a risk
that unknown cost and demand pressures will emerge that have not been included
within the outlook.  It is suggested that no allowance for this is included within the
best case scenario, a £0.500m general allowance is included within the worst case
and a £0.250m allowance included within the mid-range scenario each year. 
4.5.3 The cost pressures are detailed in appendix 3 and are summarised in the table
Page 136

Page 137

below and will be subject to review during the financial year.   
4.5.4  2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Universal Credit – HB
Admin Grant
40 80 120 160 200
Oracle Fusion 35 35 35 35 35
ASN Support 0 75 206 206 206
SEEMiS Membership Fees 9 11 13 16 16
Sustainable rate for partner
providers
342 327 327 327 327
Election costs 0 0 0 0 300
HR System 100 (50) (50) (50) (50)
Waste 7 25 78 (91) (91)
Compliance with BMW Ban 0 400 1,600 1,150 0
Local Development Plan 0 50 0 50 0
House Loans 19 19 19 19 19
Parking 15 15 15 15 15
IT – Increased bandwidth in
schools
26 26 26 26 26
Salt for Winter Maintenance 163 163 163 163 163
Cessation of red diesel 78 78 78 78 78
Insurance 414 414 414 414 414
Allowance for pressures in
future years
250 500 750 1,000 1,250
Total Cost and Demand
Pressures 
1,498 2,168 3,794 3,518 2,908 
4.5.5 The cost and demand pressures relating to Social Work within the Health and
Social Care Partnership are summarised within paragraph 4.6.3. 
4.6 Health and Social Care Partnership 
4.6.1  The Council, at the budget meeting on 24 February 2022, agreed a base
allocation to the HSCP of £69.005m for 2022-23 as well as indicative flat cash
allocations for 2023-24 to 2026-27.  On 2 March 2022 the Local Government
Finance Circular 1/2022 was published which distributed additional funding of
which £4.037m was required to be passed to the HSCP, therefore their allocation
increased from £69.005m to £73.042m.  
4.6.2 In the budget outlook, I have assumed flat cash allocations across all scenarios.
These are only assumptions and it will be a matter for Council to consider as part
of the budget process next year.   
4.6.3 Social Work services have already identified a number of cost and demand
pressures and these are summarised below and included within Appendix 4 for
information purposes.  It is expected that the HSCP absorb their cost and demand
pressures from their funding allocation.  Note that these only extend to three years
rather than the five years within this Council budget outlook.   
Page 137

Page 138

2023-24
£000
2024-25
£000
2025-26
£000
Pay Inflation 1,104 1,757 2,423
Pay Increments 103 206 309
Non-Pay Inflation 3,490 6,981 10,680
Care Services for Younger Adults 412 832 1,261
Adult Services - Supported Living 344 686 1,029
Continuing Care for Looked After
Children
250 500 750 
Unknown Cost and Demand
Pressures
500 1,000 1,500
Total Cost Increase estimates
for Social Work
6,203 11,962 17,952 
4.7 Estimated Budget Gap PRIOR to Measures to Balance the Budget 
4.7.1 The budget gap in the mid-range scenario after allowing for the current base
commitments, employee adjustment, non-pay inflation and cost and demand
pressures is summarised in the table below.  This is the budget gap prior to
factoring in any previous savings decisions or potential options towards balancing
the budget. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Base Budget 273,346 273,362 273,371 273,380 273,389
Employee Cost Changes 5,924 9,719 13,576 17,497 21,482
Non-Pay Inflation 4,489 7,206 10,124 13,259 16,628
Cost and Demand
Pressures
1,498 2,168 3,794 3,518 2,908
Total Estimated
Expenditure
285,257 292,455 300,865 307,654 314,407
Estimated Funding 270,421 268,558 266,718 264,900 263,105
Estimated Budget
Surplus / (Gap)
Cumulative
(14,836) (23,897) (34,147) (42,754) (51,302) 
4.8 Measures to Balance the Budget 
4.8.1 In previous years, a general inflationary increase of 3% has been applied to fees
and charges.  Within the last reported budget outlook a range of between 2%
(worst case) and 4% (best case) with a mid-range of 3% was included. However,  
in light of the increasing inflation we are experiencing on many cost areas, the
calculations have now been updated to a range of between 3% (worst case) and
9% (best case) with a mid-range of 6%. This results in additional income of
£0.390m in 2023-24 in the mid-range scenario. 
4.8.2 A number of policy options were agreed at the Council meeting on 24 February
Page 138

Page 139

4.8.3
2022 that impacted on 2023-24 and beyond.   These are now factored into the
budget outlook, reducing the budget gap. 
An ELT group have been exploring emerging savings options and early
indications regarding these have now been incorporated into the budget outlook.
These options are still being refined, and further options will continue to be
explored, however initial estimates relating to those identified so far that have
been incorporated into the budget outlook are noted in the table below. 
Potential Saving 2023-24
£000
Detail
Education 700 Based on an assessment of forecast pupil
numbers over the next 5 years.
Service Concessions 4,000 Alteration to accounting treatment to align the
repayment of borrowing relating to new schools
over their asset life.
Pension Scheme  100 Estimated savings in relation to additional
voluntary contributions to the pension scheme.
Commercial Income and
Events
50 Estimated increase in commercial income and
events. Rising to £0.250m from 2024-25
onwards. 
4,850 
These savings are of a recurring nature therefore the following has also been
incorporated into the figures within the budget outlook. 
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Emerging Savings Options 5,050 5,050 5,050 5,050 
4.8.4 In terms of Council Tax, a 3% increase has been assumed across all scenarios,
this being the increase applied in 2022-23.  It will be a matter for Council to decide
the level of Council Tax increase.   
4.8.5 In respect of Live Argyll, at the budget meeting on 24 February 2022, Council
agreed to defer the proposed 3% reduction in the management fee for 2022/23
and noted that this will be applied in 2023-24 and will be subject to any future
budget decisions. 3% of the 2022-23 management fee equates to £0.122m and
this reduction has been built into the budget outlook from 2023-24 onwards.  No
further reduction has been built in, this would be a matter for Council to consider. 
4.8.6  The table below summarises the proposed measures to balance the budget in the
mid-range scenario. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Fees and Charges
Increase
746 1,502 2,269 3,048 3,838
Management/Operational
Savings February 2021
20 20 20 20 20
Policy Savings February 128 128 128 128 128
Page 139

Page 140

2021
Policy Savings agreed
February 2022
3 6 6 6 6
Council Tax Increase  1,683 3,450 5,278 7,170 9,127
Reduction to Live Argyll
Management Fee
122 122 122 122 122
Emerging Savings Options 4,850 5,050 5,050 5,050 5,050
Total Measures to
Balance the Budget
7,552 10,278 12,873 15,544 18,291 
4.9 Estimated Budget Gap AFTER Measures to Balance the Budget 
4.9.1 The table below summarises the estimated budget gap in the mid-range scenario. 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Estimated Budget Gap
Prior to Measures to
Balance Budget
(14,836) (23,897) (34,147) (42,754) (51,302)
Savings Measures 7,552 10,278 12,873 15,544 18,291
Estimated Budget
Surplus / (Gap)
Cumulative
(7,284) (13,619) (21,274) (27,210) (33,011)
Estimated Budget
Surplus / (Gap) In Year
(7,284) (6,336) (7,655) (5,936) (5,801) 
4.9.2 In the mid-range scenario, the budget gap estimated over the five year period
2023-24 to 2027-28 is £33.011m with a gap of £7.284m in 2023-24.   
4.9.3 The budget gap in the best case scenario over the five years is £17.851m with a
gap of £2.177m in 2023-24 and in the worst case scenario, the budget gap over
the five years is £75.206m with a gap of £13.560m in 2023-24.  A summary of all
three scenarios is included within Appendix 1. 
4.9.4 The changes from the previous anticipated outlook reported to the Policy and
Resources Committee on 11 August 2022 are summarised in the table below: 
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Previously reported
budget surplus / (gap)
Cumulative
(7,980) (15,124) (23,410) (30,004) (36,493)
Adjustment to Employee
Base Budget relating to
2022-23 Pay Award
(2,112) (2,112) (2,112) (2,112) (2,112)
Adjust Pay Inflation from
2% to 3.5% in 2023-24 
(2,234) (2,278) (2,324) (2,371) (2,419)
Page 140

Page 141

Adjustment to Non Pay
Inflation
(198) 65 352 667 1,013
Increase Fees and
Charges from 3% to 6%
390 780 1,170 1,560 1,950
Emerging Savings
Options
4,850 5,050 5,050 5,050 5,050
Revised Budget
Surplus / (Gap)
Cumulative
(7,284) (13,619) (21,274) (27,210) (33,011) 
4.10 Budget Working Group 
4.10.1 As part of the 2021-22 and 2022-23 budgets, a cross party Budget Working Group
(BWG) was established comprising of six Members from the administration, three
Members from the opposition and two Trade Union representatives. The BWG did
not have any decision making authority but could report to and make
recommendations to either the Council or the Policy and Resources Committee. 
Its primary purpose was to engage with officers and provide scrutiny on the
identification of savings options as they are developed. 
4.10.2 Given the significant budget gap over the next five years it was agreed at Policy
and Resources Committee on 16 June 2022 that a similar group will be
established to support the 2023-24 budget approach. The first meeting of this
group took place on 7 September 2022. 
5. CONCLUSION 
5.1 In the mid-range scenario, the budget gap estimated over the five year period
2023-24 to 2027-28 is £33.011m with a gap of £7.284m in 2023-24.   Council
officers are continuing to further develop savings options during 2022-23 and
these will be presented to members at a future date to help balance the budget in
future years. 
5.2 
5.3 
This is a very challenging budget outlook position and the level of Scottish
Government grant and the pay award are the two assumptions that could alter the
figures significantly.  At this advanced stage in negotiations relating to the pay
award estimated figures have been incorporated into the budget outlook, however
both this and the funding settlement will be kept under close review and the
budget outlook updated as and when further information becomes available.   
It should be noted that service concession flexibility has now been agreed by the
Cabinet Secretary for Finance and the Economy however a further discussion is
now required with the newly appointed external auditors to refine this figure. The
flexibility, should the Council approve to use, will provide a one-off gain in addition
to a recurring saving.  At this stage an estimated recurring saving of £4m has been
incorporated into the budget outlook as a potential saving but this will be refined
as discussions progress. 
5.4 A cross party Budget Working Group has been established to support the budget
approach. This group does not have any decision making authority but can report
Page 141

Page 142

to and make recommendations to either the Council or the Policy and Resources
Committee.  
6. IMPLICATIONS 
6.1 Policy -  Sets out the budget outlook that provides the financial
envelope for policy decisions.
6.2 Financial -  Sets best, worst and mid-range scenarios in respect of
the budget outlook.  The medium to longer term
financial strategy is being updated and the Council are
actively continuing to pursue opportunities to mitigate
against future budget gaps. 
6.3 Legal -  None directly from this report but Council will need to
balance the budget. 
6.4 HR -  None directly from this report but there is a strong link
between HR and budgets.
6.5 Fairer Scotland Duty - See below
6.5.1 Equalities None directly from this report but any proposals to
address the estimated budget gap will need to consider
equality issues.
6.5.2 Socio Economic Duty None directly from this report but any proposals to
address the estimated budget gap will need to consider
socio economic issues.
6.5.3 Islands Duty None directly from this report but any proposals to
address the estimated budget gap will need to consider
any island specific issues. 
6.6 Climate Change The Council is committed to addressing climate change
and reviews how Services are delivering this on an
ongoing basis within the available budget resources.
6.7 Risk -  None directly from this report but any proposals to
address the estimated budget gap will need to consider
risk.
6.8 Customer Service - None directly from this report but any proposals to
address the estimated budget gap will need to consider
customer service. 
Kirsty Flanagan
Executive Director/Section 95 Officer
15 September 2022 
Policy Lead for Finance and Commercial Services:  Councillor Gary Mulvaney 
APPENDICES: 
Appendix 1 – Budget Outlook, Best, Worst and Mid-Range Scenarios
Appendix 2 – Non Pay Inflation
Appendix 3 – Cost and Demand Pressures (Council Services)
Appendix 4 – Cost and Demand Pressures (Social Work) 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 142

Page 143

BUDGET OUTLOOK 2023-24 to 2027-28 APPENDIX 1
POLICY AND RESOURCES COMMITTEE - 13 OCTOBER 2022
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2023-24
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
Base Budget 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127 269,127
Base Budget Adjustments 4,219 4,235 4,244 4,253 4,262 4,219 4,235 4,244 4,253 4,262 4,219 4,235 4,244 4,253 4,262
Revised Base Budget 273,346 273,362 273,371 273,380 273,389 273,346 273,362 273,371 273,380 273,389 273,346 273,362 273,371 273,380 273,389
Pay Award 2,978 6,016 9,114 12,274 15,497 5,212 8,294 11,438 14,645 17,916 7,445 15,262 23,470 32,089 41,138
Pay Increments 345 690 1,035 1,380 1,725 690 1,380 2,070 2,760 3,450 690 1,380 2,070 2,760 3,450
Additional Teacher Costs (23) 23 23 24 24 22 45 68 92 116 (23) 23 23 24 24
Total Employee Cost Changes (Council Services) 3,300 6,729 10,172 13,678 17,246 5,924 9,719 13,576 17,497 21,482 8,112 16,665 25,563 34,873 44,612
Non-Pay Inflation - Council Services 4,059 6,564 9,243 12,109 15,176 4,489 7,206 10,124 13,259 16,628 6,519 11,050 15,811 20,822 26,103
Housing Benefits Admin Grant 40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
Oracle Fusion running costs 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35
ASN Support 0 0 198 198 198 0 75 206 206 206 0 145 444 444 444
SEEMIS Membership Fees 9 11 13 16 16 9 11 13 16 16 9 11 13 16 16
Sustainable Rate for Partner Providers 342 327 327 327 327 342 327 327 327 327 342 327 327 327 327
Election Costs 0 0 0 0 250 0 0 0 0 300 0 0 0 0 350
Software support for a  new HR system & Backfill for project
team. 50 (50) (50) (50) (50) 100 (50) (50) (50) (50) 150 (50) (50) (50) (50)
Waste 7 25 78 (91) (91) 7 25 78 (91) (91) 7 25 78 (91) (91)
Compliance with BMW Ban 0 200 800 800 0 0 400 1,600 1,150 0 0 875 3,500 1,500 0
Planning (Local Development Plan) 0 50 0 50 0 0 50 0 50 0 0 50 0 50 0
House Loans 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
Parking 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
IT - increased bandwidth in schools 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26
Increase in cost of Salt for Winter Maintenance 147 147 147 147 147 163 163 163 163 163 179 179 179 179 179
Cessation of Red Diesel usage 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78
Rightsize Council insurance budgets 414 414 414 414 414 414 414 414 414 414 414 414 414 414 414
Allowance for Cost and Demand Pressures Future Years
0 0 0 0 0 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500
Total Cost and Demand Pressures 1,182 1,377 2,220 2,144 1,584 1,498 2,168 3,794 3,518 2,908 1,814 3,229 6,698 5,122 4,462
Total Estimated Expenditure PRIOR to measures to
balance the budget 281,887 288,032 295,006 301,311 307,395 285,257 292,455 300,865 307,654 314,407 289,791 304,306 321,443 334,197 348,566
Scottish Government Grant 214,895 213,821 212,752 211,688 210,629 213,817 211,679 209,562 207,466 205,391 212,736 209,545 206,402 203,305 200,256
Specific Funding for Additional Teachers 515 512 509 506 503 513 508 503 498 493 510 502 494 487 480
Council Tax 56,367 56,790 57,216 57,645 58,077 56,091 56,371 56,653 56,936 57,221 55,815 55,955 56,095 56,235 56,376
Total Funding 271,777 271,123 270,477 269,839 269,209 270,421 268,558 266,718 264,900 263,105 269,061 266,002 262,991 260,027 257,112
Budget Surplus / (Gap) PRIOR to measures to balance the
budget (10,110) (16,909) (24,529) (31,472) (38,186) (14,836) (23,897) (34,147) (42,754) (51,302) (20,730) (38,304) (58,452) (74,170) (91,454)
Measures to Balance the Budget:
Fees and Charges 1,119 2,253 3,404 3,048 5,757 746 1,502 2,269 3,048 3,838 373 751 1,135 1,524 1,919
Live Argyll - 3% decrease to management fee 122 122 122 122 122 122 122 122 122 122 122 122 122 122 122
Management/Operational Savings agreed February 2021
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Policy savings agreed February 2021 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128
Policy savings reported Agreed February 2022 3 6 6 6 6 3 6 6 6 6 3 6 6 6 6
Council Tax Increase 1,691 3,445 5,265 7,152 9,109 1,683 3,425 5,227 7,092 9,021 1,674 3,403 5,188 7,031 8,933
Council Tax Increase (Growth element) 0 34 69 105 143 0 25 51 78 106 0 17 34 52 70
Emerging Savings Options 4,850 5,050 5,050 5,050 5,050 4,850 5,050 5,050 5,050 5,050 4,850 5,050 5,050 5,050 5,050
Total Measures to Balance the Budget 7,933 11,058 14,064 15,631 20,335 7,552 10,278 12,873 15,544 18,291 7,170 9,497 11,683 13,933 16,248
Budget Surplus / (Gap) Cumulative AFTER measures to
balance the budget (2,177) (5,851) (10,466) (15,841) (17,851) (7,284) (13,619) (21,274) (27,210) (33,011) (13,560) (28,807) (46,770) (60,237) (75,206)
Budget Surplus / (Gap) In Year AFTER measures to balance
the budget (2,177) (3,674) (4,615) (5,376) (2,010) (7,284) (6,336) (7,655) (5,936) (5,801) (13,560) (15,247) (17,963) (13,468) (14,969)
Best Case Scenario Worst Case ScenarioMid-Range Scenario
Page 143

Page 144

NON-PAY INFLATION (COUNCIL) Appendix 2
Service Category Basis of Inflation
Inflation
Percentage
Mid Range
2023/24
Council Wide Electricity
Due to current market condition for electricity 20% increase mid range, with a 0.5%
tolerance for best and worst case.
20.00% 481,154
Council Wide Gas
Due to current market condition for gas 100% increase mid range, with a 0.5%
tolerance for best and worst case.
75.00% 494,710
Council Wide Heating Oils
Due to current market condition for heating oils 100% increase mid range, with a 0.5%
tolerance for best and worst case.
100.00% 266,842
Council Wide Solid Fuel
Based on estimates provided by facility services with a 0.5% tolerance for best and
worst case.
8.00% 18,430
Council Wide Water Charges Current rate of inflation with a 0.5% tolerance for best and worst case. 9.10% 53,241
Council Wide Vehicle Fuel Historic rate carried forward from last year - will be reviewed during 2022-23
4.97% 60,396
Council Wide Central Repairs - Outside Contractors
Based on labour and materials costs survey data from the Royal Institute of Chartered
Surveyors (RICS) and information from the property team on the typical allocation of
their costs between labour and materials.
3.40% 65,993
Council Wide Contingency for unidentified/insufficient inflation estimate £250k built in to mid-range and £500k built in to worst case scenario 250,000
Council Wide Insurances Current rate of inflation with a 0.5% tolerance for best and worst case. 9.10% 146,114
1,836,880
Education Pre-Primary Partner Provider Uplift
Brought into line with the estimate within Social Work for the impact of the Real Living
Wage on service costs.
5.00% 180,699
Education External School Placements Based on prior year uplifts 8.00% 90,261
Commercial Services Catering Purchases
Figure used by facility services based on national estimates for year 1 with a 0.5%
tolerance for best and worst case.
15.00% 306,332
Legal & Regulatory Support Leisure SLA-MAKI/Islay Pools
Based on RPI at February 2022 with a 0.5% tolerance in the best and worst case
scenarios.
8.18% 13,757
Legal & Regulatory Support Leisure SLA-Atlantis Based on RPI at May 2022 with a 0.5% tolerance in the best and worst case scenarios.
10.17% 56,367
Legal & Regulatory Support NPDO-Variable Element Based on year on year RPI uplift with a 0.5% tolerance for best and worst case.
8.18% 599,843
Legal & Regulatory Support NPDO-Utilities Rebate RPI at February 2022 with a 0.5% tolerance for best and worst case. 8.20% -23,945
Legal & Regulatory Support NPDO-Electricity
Due to current market condition for electricity 20% increase mid range, with a 0.5%
tolerance for best and worst case.
20.00% 89,930
Legal & Regulatory Support NPDO-Gas
Due to current market condition for gas 75% increase mid range, with a 0.5% tolerance
for best and worst case.
100.00% 159,308
Legal & Regulatory Support NPDO-Heating Oil
Due to current market condition for heating oils 100% increase mid range, with a 0.5%
tolerance for best and worst case.
100.00% 68,801
Legal & Regulatory Support NPDO-LPG
Due to current market condition for gas 75% increase mid range, with a 0.5% tolerance
for best and worst case.
75.00% 53,900
Legal & Regulatory Support NPDO-Water Current rate of inflation with a 0.5% tolerance for best and worst case. 9.10% 31,906
Legal & Regulatory Support HUB-Variable Element Based on year on year RPI uplift with a 0.5% tolerance for best and worst case.
8.18% 93,883
1,721,042
Customer and Support Services ICT Historic rate carried forward from last year - will be reviewed during 2022-23
15.00% 154,650
Roads and Infrastructure Waste PPP-Private Contractor Inflation Based on RPIX at February 2022 with a 0.5% tolerance for best and worst case.
7.09% 465,049
Roads and Infrastructure Waste PPP-Central Government Inflation
Based on Landfill Tax increase between 21/22 and 22/23 with a 0.5% tolerance for best
and worst case.
1.96% 36,765
Roads and Infrastructure Roads - Bitumen for Road Surfacing Based on price increases in 2022/23 with a 0.5% tolerance for best and worst case.
40.00% 158,512
Roads and Infrastructure Electricity - Street Lighting
Due to current market condition for electricity 20% increase mid range, with a 0.5%
tolerance for best and worst case.
20.00% 116,305
931,281
4,489,203
Council Wide Total
Executive Director Douglas Hendry - Total
Executive Director Kirsty Flanagan - Total
Total Non-Pay Inflation in the Mid Range
Page 144

Page 145

COUNCIL COST AND DEMAND PRESSURES 2023-24 to 2027-28
Department Service Cost/Demand Pressure 2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
Chief Executive's Unit Financial Services Universal Credit “Full” Service went live in Sept 2018, but managed migration has
been deferred to 2021 and will not be completed until 2024. The DWP will reduce
the Housing Benefit Administration Subsidy they pay to the Council as some
claimants come off of Housing Benefit processed by Council staff and go onto
Universal Credit processed by the DWP.  The Council’s caseload has reduced
marginally since implementation of Universal Credit but it is hard to predict just how
quickly the rest of the working age caseload will migrate from Housing Benefit to
Universal Credit between now and 2024.  These figures represent our best estimates
at this time.
40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
Chief Executive's Unit Financial Services Implementation of new financial ledger system - Oracle Fusion Project 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35
Executive Director -
Douglas Hendry
Education The demand for ASN support in Argyll and Bute has continued to grow with a
significant increase in, and early identification of children and young people
presenting with complex additional support needs, including mental health
difficulties.  It is anticipated that growth continues over the next 5 years however
the extent of this growth is difficult to determine.  Scottish Government statistics
show that the number of pupils identified with ASN has increased markedly since
2010 and there continue to be year on year increases. These increases are likely due
to continued improvements in recording and the introduction of the additional need
types 'Child plans' and ‘Other’ in 2011.   Scottish Government statistical datasets
show that the percentage of school roll in mainstream schools of pupils with ASN
has increased by approximately 3% year on year.  Within many authorities, this
means increased numbers of children accessing specialist provision.
0 0 198 198 198 0 75 206 206 206 0 145 444 444 444
Executive Director -
Douglas Hendry
Education The SEEMiS group, provider of the Council's Education Management Information
System, recently reviewed their long term financial plan and refreshed it to cover
the period 2021/22 to 2025/26.  As a result of this exercise there were implications
on Membership fees with a cost pressure on the Education service arising from
financial year 2023/24.  Indicative membership fees were provided for financial
years 2021/22 to 2022/23 and these have been factored in accordingly.
9 11 13 16 16 9 11 13 16 16 9 11 13 16 16
Executive Director -
Douglas Hendry
Education The Council has had a requirement to deliver 1140 hours of Early Learning and
Childcare from August 2021. The Council has been notified that the ring fenced
funding will be reduced by £1.124m from 2022-23. Also, as part of the 1140
expansion programme, the Scottish Government 'Funding Follows the Child'
guidance, requires local authorities to set a rate locally that is paid to funded
providers in the private and third sectors, including childminders, to deliver the
funded entitlement that allows them to deliver a high quality ELC experience for all
children. This rate should be sustainable and reflect national policy priorities,
including funding to enable payment of the real Living Wage to all childcare workers
delivering the funded entitlement and have a margin for re-investment built in. The
service has worked hard to mitigate the effects of this and has reduced expenditure
as far as possible.  However there remains a funding gap, the service are able to
cover the over spend for 2022-23 from carry forwards so the cost pressure is
requested from 2023-24 onwards. The service will continually review their plans
looking for efficiencies where possible.
342 327 327 327 327 342 327 327 327 327 342 327 327 327 327
Executive Director -
Douglas Hendry
Legal and Regulatory
Services
Estimated cost (to be borne by the Council)  of carrying out local Government
elections in May 2027 (and in financial year 2027/28). Operating approx. 100 polling
stations and carrying out poll and count for 11 Multi member wards – requiring 11
separate counts
0 0 0 0 250 0 0 0 0 300 0 0 0 0 350
Executive Director -
Kirsty Flanagan
HR Costs for a project team for a  new HR system & Backfill . This is a total new system
build. 50 -50 -50 -50 -50 100 -50 -50 -50 -50 150 -50 -50 -50 -50
Best Case Mid Range Scenario Worst Case
APPENDIX 3
Page 145

Page 146

COUNCIL COST AND DEMAND PRESSURES 2023-24 to 2027-28
Department Service Cost/Demand Pressure 2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2023-24
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
Best Case Mid Range Scenario Worst Case
APPENDIX 3
Executive Director -
Kirsty Flanagan
Waste Additional costs derived from the current waste model. Note that the treatment of
waste going forward has not been fully costed due to uncertainty as to how the
council will deal with the Bio Municipal Waste ban and the Deposit Return Scheme.
Pressure has increased due to an updated waste model.
7 25 78 (91) (91) 7 25 78 (91) (91) 7 25 78 (91) (91)
Executive Director -
Kirsty Flanagan
Waste Achieving compliance with ban on biodegradable municipal waste in 2025.  This is
the estimated revenue costs from potential scenarios, remaining in or coming out of
the current waste PPP contract.  Coming out of the Waste PPP contract would
create an additional one-off cost.  There are also capital cost implications that are
not included within these estimates.  Due to the complexity of the model, estimates
are subject to change. 
0 200 800 800 0 0 400 1,600 1,150 0 0 875 3,500 1,500 0
Executive Director -
Kirsty Flanagan
Planning Local development plan will require to be done under the new Planning legislation
which is a revised process from the current one and will have a 10 year life. The new
process has 2 stages where there is likely to be a cost pressure - a gate check
followed by an examination some time later.
0 50 0 50 0 0 50 0 50 0 0 50 0 50 0
Executive Director -
Kirsty Flanagan
Housing Rightsize budget for House Loans which is a historic budget which has simply been
rolled forward year on year
19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
Executive Director -
Kirsty Flanagan
Parking Loss in income at Glen Loin Car park, Arrochar due to end of lease and responsibility
for car park returning to owners, Luss Estates
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
Executive Director -
Kirsty Flanagan
IT Increased bandwidth for schools to allow digital transformation to support the move
to online learning
26 26 26 26 26 26 26 26 26 26 26 26 26 26 26
Executive Director -
Kirsty Flanagan
Roads Increased cost of Salt for Winter Maintenance, average useage of 15,000 tonnes of
salt over the winter period would equate to £163k of additional costs.
147 147 147 147 147 163 163 163 163 163 179 179 179 179 179
Executive Director -
Kirsty Flanagan
Roads Change at 1 April 2022 to stop the use of Red Diesel in certain vehicles has resulted
in an unavoidable increas in fuel costs in Roads and Infrastructure.
78 78 78 78 78 78 78 78 78 78 78 78 78 78 78
Council Wide Council Wide Rightsize budget for Council insurances which is a historic budget that requires to be
increased in line with the current insurance costs.
414 414 414 414 414 414 414 414 414 414 414 414 414 414 414
Council Wide Council Wide General provision for unidentified Cost and Demand Pressures 0 0 0 0 0 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500
TOTAL 1,182 1,377 2,220 2,144 1,584 1,498 2,168 3,794 3,518 2,908 1,814 3,229 6,698 5,122 4,462
Page 146

Page 147

SOCIAL WORK COST AND DEMAND PRESSURES - 2023-24 to 2025-26 APPENDIX 4
Service Cost/Demand Pressure 2023-24
£000
2024-25
£000
2025-26
£000
2023-24
£000
2024-25
£000
2025-26
£000
2023-24
£000
2024-25
£000
2025-26
£000
All Social Work Estimated Pay inflation reflecting a best case of 2%, mid range of 3.5% in 2023/24
then 2% thereafter and worst case of 5%.
631 1,274 1,930 1,104 1,757 2,423 1,577 3,232 4,970
All Social Work Estimated Pay increments, best case is that 50% of the incremental changes based
on 2022/23 are absorbed and in the mid-range and worst case, the increase is in
line with the increase in 2022/23.
52 103 155 103 206 309 103 206 309
All Social Work Non-pay inflation, best and worst case based on unavoidable/inescapable inflation
and worst case.
3,014 5,982 9,110 3,385 6,764 10,346 3,756 7,524 11,541
All Social Work Non-pay inflation impact of payroll inflation on NHS posts which are recharged to
Social Work.
96 196 302 105 217 334 105 217 334
Adult Care Younger Adults Demand Growth (Excluding Physical Disability): There has been
continuing increase in demand for care and support services for profoundly
disabled younger adults (ie under 65) whose parents have historically provided
care but are no longer able to.  The best case assumes a 1% increase in spending
reflecting the limited service capacity in the area, the mid-range reflects 2% growth
and the worst case reflects 3% growth.
170 342 516 341 689 1,044 511 1,038 1,582
Adult Care Younger Adults Demand Growth - Physical Disability: There has been continuing
increase in demand for care and support services for profoundly disabled younger
adults (ie under 65) whose parents have historically provided care but are no
longer able to.  The best case assumes a 1% increase in spending reflecting the
limited service capacity in the area, the mid-range reflects 2% growth and the
worst case reflects 3% growth.
35 71 107 71 143 217 106 215 328
Adult Services Learning Disability Budget Adjustment - The Learning Disability Supported Living
budget is carrying a recurring unbudgeted commitment of circa £743k which is
contributing to the recurring overspend on the Social Work budget. To address this
situation, it is proposed to realign the budget over the three year period from
2023/24 to 2025/26 whilst also reviewing cases and redesigning services. The
adjustment will be reviewed annually to reflect spending reductions delivered as
well as any changes to funding and practice resulting from the implementation of
the Independent Review of Adult Social Care.
248 495 743 248 495 743 248 495 743
Adult Services Physical Disability Budget Adjustment - The Physical Disability budget is carrying a
recurring unbudgeted commitment of circa £89k which is contributing to the
recurring overspend on the Social Work budget. To address this situation, it is
proposed to realign the budget over the three year period from 2023/24 to
2025/26 whilst also reviewing cases and redesigning services. The adjustment will
be reviewed annually to reflect spending reductions delivered as well as any
changes to funding and practice resulting from the implementation of the
Independent Review of Adult Social Care.
30 60 89 30 60 89 30 60 89
Best Case Mid Range Worst Case
Page 147

Page 148

Service Cost/Demand Pressure 2023-24
£000
2024-25
£000
2025-26
£000
2023-24
£000
2024-25
£000
2025-26
£000
2023-24
£000
2024-25
£000
2025-26
£000
Best Case Mid Range Worst Case
Adult Services Mental Health Budget Adjustment - The Mental Health budget is carrying a
recurring unbudgeted commitment of circa £197k which is contributing to the
recurring overspend on the Social Work budget. To address this situation, it is
proposed to realign the budget over the three year period from 2023/24 to
2025/26 whilst also reviewing cases and redesigning services. The adjustment will
be reviewed annually to reflect spending reductions delivered as well as any
changes to funding and practice resulting from the implementation of the
Independent Review of Adult Social Care and any additional funding provided to
address mental health issues as a consequence of the COVID pandemic.
66 131 197 66 131 197 66 131 197
Children and
Families
Continuing Care demand for Looked After young people who are cared for by the
HSCP. The best case scenario is that the expected additional demand can be
funded from within existing resources as a result of planned improvements to the
service delivery model (eg shift away form high cost external residential care to
local foster and kinship care), the mid case reflects £250k per annum and the worst
case reflects £500k per annum.
0 0 0 250 500 750 500 1,000 1,500
All Social Work Allowance for unknown cost and demand pressures which could arise. The best
case assumes unknown pressures totalling £250k per annum, the mid range £500k
per annum and the worst case £750k per annum.
250 500 750 500 1,000 1,500 750 1,500 2,250
TOTAL COST AND DEMAND PRESSURES 4,592 9,154 13,899 6,203 11,962 17,952 7,752 15,618 23,843
Page 148

Page 149

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 13 OCTOBER 2022
BUDGET APPROACH 
1. INTRODUCTION 
1.1 
2. 
2.1 
The purpose of this report is to update the Policy and Resources Committee
on the budget approach already commenced by officers to assist in identifying
options to help close the gap and provide a high level draft budget timetable for
2023-24.   
RECOMMENDATIONS 
It is recommended that the Policy and Resources Committee consider the
2023-24 budget approach. 
3. BUDGET OUTLOOK 
3.1 The budget outlook position is continually monitored with an update reported to
each Policy and Resources Committee.  The latest budget outlook which is
included within today’s agenda advises that in the mid-range scenario, the
budget gap estimated over the five year period 2023-24 to 2027-28 is
£33.011m with a gap of £7.284m in 2023-24.      
3.2 Officers have already looked at some areas where there will be savings or
additional income that could be built into the budget next year to reduce the
budget gap. These emerging savings options amount to £5.240m and have
already been built into the budget outlook. The most significant being the
savings in respect of the service concession flexibility and a potential saving in
Education due to the forecast pupil numbers over the next 5 years.  The cost of
the pay award in 2022-23 added £2.112m to the gap with a further £2.234m
added to the pay award assumption in 2023-24.   
4. 2023-24 BUDGET APPROACH 
4.1 Officers have already commenced work on a budget approach for 2023-24 and
there are two main aspects to this work:
 A review of services considering whether it’s a duty, power or non-
statutory service.
 A service redesign exercise assuming 75% of existing budget. 
Duty, Power or Non-Statutory Review 
4.2 A number of years ago, templates were populated with information as to the
legislative basis for the provision of service i.e. statutory duty, statutory power
or a non-statutory service.  The Executive Leadership Team (ELT) agreed that
it would be beneficial to revisit and update the information contained in these
Page 149 Agenda Item 6

Page 150

templates as they did provide good evidence that could assist the Budget
Working Group and full Council in any future decisions they need to take on
the budget.   
4.3 A new template has been created based on lessons learned from the previous
template to make it much clearer on what elements of a service fall into which
legislative category.  Financial Services have produced a list of service
activities based on the controllable budget and the templates will align to this
list.  The list of activities is attached in Appendix 1 for Members information.   
4.4 In 2022-23 only 27% of our budget is controllable and the service activity
appendix shows where this budget is being spent.  In order to balance the
budget, a number of the activities would need to significantly reduce or stop
altogether.  You will see that this is a challenging task as many of the activities
provide much needed services for our communities.   
4.5 The templates have now been completed by all services and an ELT group will
be reviewing over the month of September.  It has been agreed that we will
review the information provided in relation to discretionary activities first and
consider if any of these could be materially reduced or stopped. As required
we would then move on to Powers then Duties and again consider if any of
these activities can be challenged/materially reduced/delivered in a different
way.   
Service Redesign 
4.6 An additional template, at Head of Service level, has been completed by all
Services outlining what the service would look like if it had to be redesigned
with 75% of the current funding.  The templates should provide sufficient clarity
that outlines what the service would be doing, what they wouldn’t be doing and
what would be getting done differently.   
4.7 As with the duty, powers templates, the ELT group will be reviewing these over
the month of September.  It is the group’s intention to go through and identify
(a) any specific options which could be used to reduce the budget gap in 2023-
24 and (b) see what the group can come up with in terms of (i) picking out the
genuine redesign proposals in the submissions and (ii) as a group coming up
with any further ideas on service redesign which will deliver savings in the
longer term. 
4.8 The ELT group will meet on a weekly basis in September and report progress
initially to ELT for discussion and then onto Budget Working Group. It is hoped
to have a set of proposals in October. 
5 Budget Timetable 
5.1 A high level budget timetable has been produced and is included in Appendix
2.  The timetable includes the following: 
 Late October – once a set of proposals has been produced by the ELT
group. 
Page 150

Page 151

 8th December Policy and Resources Committee – a report on the budget
proposals identified to date.
 15th December – estimated date for the Scottish Government budget
announcement. 
Should further working groups be necessary these can be scheduled as
required.  A Members Seminar has been scheduled for the end of January
prior to the budget pack being published. 
6. CONCLUSION 
6.1 Officers continue to monitor the budget outlook position regularly and update
and report to Members any changes.  The Council is facing a significantly
challenging budget gap which will likely require some services to be stopped in
order to balance the budget. 
6.2 
7. 
7.1 
7.2 
7.3 
7.4 
7.5
7.5.1 
7.5.2 
7.5.3 
7.6 
7.7 
7.8
A budget approach has been developed by ELT alongside a budget timetable
and a set of proposals will be brought forward to a future budget working group
and Policy and Resources Committee for consideration. 
IMPLICATIONS 
Policy – sets out that budget approach that will inform policy decisions. 
Financial – Sets out the budget position as reported in the budget outlook. 
Legal – None directly form this report but the Council will need to balance the
budget. 
HR – None directly from this report but there is a strong link between HR and
budgets. 
Fairer Scotland Duty – See below
- Equalities – None directly from this report but any proposals to address                                                                    
the estimated budget gap will need to consider equality issues.
- Socio Economic Duty - None directly from this report but any proposals
to address the estimated budget gap will need to consider socio
economic issues.
- Islands Duty - None directly from this report but any proposals to
address the estimated budget gap will need to consider any island
specific issues. 
Climate Change – The Council is committeed to addressing climate change
and reviews how Services are delivering this on an ongoing basis within the
available budget resources.
Risk - None directly from this report but any proposals to address the
estimated budget gap will need to consider risk. 
Customer Service - None directly from this report but any proposals to address
the estimated budget gap will need to consider customer service.    
Page 151

Page 152

Kirsty Flanagan
Executive Director/Section 95 Officer
15 September 2022 
Policy Lead for Finance and Commercial Services:  Councillor Gary
Mulvaney 
APPENDICES: 
Appendix 1 – Budget Activities 2022-23 (Controllable)
Appendix 2 – 2023-24 Draft Budget Timetable 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk 
Page 152

Page 153

APPENDIX 1 
Budget Activities 2022-23
Controllable Budget Only 
Page 153

Page 154

APPENDIX 2
2023-24 DRAFT BUDGET TIMETABLE
Date Event Purpose
7 Sep 2022 Budget Working Group Introductory meeting to set
out approach, updated budget
gap, and provide initial
indication of any emerging
options.
Month of September ELT Group working through
Duty, Powers & Non-Statutory
Templates and 75% Service
Redesign Templates
To identify savings options for
2023/24 and possible future
years. 
Early October 2022 ELT Review saving options
identified by ELT group.
13 October 2022 P&R Committee Updated Budget Outlook
2023/24 to 2027/28 
Late October 2022 Budget Working Group Update on emerging saving
options.
8 December 2022 P&R Committee Updated Budget Outlook
2023/24 to 2027/28. 
Report on budget proposals 
identified to date.  
Estimated 15 December 2022 SG Budget Announcement  
Week beginning 19 December
2022
Budget Working Group Update following SG Budget
Announcement.
Week beginning 16 January
2023
Budget Working Group Update on proposals to
balance the budget.
End of January 2023 Elected Members Seminar  Budget 2023/24 Update
9 February 2023 Budget Pack published Budget pack included in
release of P&R papers.
Including:
Individual EqSEIA’s;
EqSEIA covering budget as a
whole
16 February 2023 P&R Committee Consider budget proposals and
make recommendations to
Council.
? February 2023 EJCC Budget 2023/24 Update
23 February 2023 Council Set Budget
By 30/06/23 Services Proposed date of
redundancies for any
proposals that have been
agreed by Council 
Page 154

Page 155

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES  COMMITTEE
FINANCIAL SERVICES 13 OCTOBER 2022
POLICY FOR EMPTY PROPERTY RELIEF IN NON-DOMESTIC RATES FROM 1
APRIL 2023 
1. EXECUTIVE SUMMARY 
1.1 On 31 January 2019 the Scottish Government committed to devolving empty
property relief to councils in time for the next revaluation. However the devolution
of Empty Property Relief (EPR) to local government was delayed because of the
pandemic and the go-live date for the devolved EPR is now 1 April 2023. New
regulations prescribe that the Council has to have an agreed policy before 1 April
2023 otherwise it cannot grant EPR relief from 1 April 2023 onwards to any
business or business owner. 
1.2 This paper proposes that the Council’s policy for the application of EPR for
properties on the Non-Domestic Rates (NDR) valuation roll from 1 April 2023 will
mirror the current arrangements as set by the Scottish Government for the relief.
This will allow time for an Empty Property Review to be conducted and
consultation both within the Council and with external stakeholders such as local
businesses. A report will then be presented to Policy and Resources Committee
in October 2023 which will have recommendations for the relief scheme from 1
April 2024 onwards.   
2. RECOMMENDATION 
2.1 It is recommended that the Policy and Resources Committee approve the Empty
Property Relief scheme for Argyll and Bute whereby; 
1. From 1 April 2023 to 31 March 2024 the scheme will be identical to the
current arrangements for Empty Property Relief.
2. A paper will be presented to Policy and Resources Committee in October
2023 on changes to the policy following consultation with stakeholders
internal and external to the Council. 
3. DETAIL 
3.1 The Council’s NDR team currently apply Empty Property Relief on NDR accounts
in our area where the lands and heritages are empty or not in use.  There are
currently 375 properties attracting relief as an empty property in NDR. The total
cost of the relief scheme is £761,269 per annum. The Scottish Government pay
these funds to the Council through the NDR allocation that comes as part of the
Revenue Support Grant. 
3.2 The current scheme is supported by legislation in sections 24 to 25 of the Local
Government (Scotland) Act 1966, the Non-Domestic Rating (Unoccupied
Property) (Scotland) Regulations 1994, and the Non-Domestic Rating
Page 155 Agenda Item 7

Page 156

(Unoccupied Property) (Scotland) Regulations 2018. 
The law prescribes that; 
1. All empty properties can get 50% relief from non-domestic rates for the first
3 months they're empty. They can then get a 10% discount after that.
2. Empty industrial properties can get 100% relief from non-domestic rates for
the first 6 months that they're empty. They can then get a 10% discount
after that.
3. Businesses can get 100% relief for the whole time a property is
unoccupied, if:
 it's a listed building
 it has a rateable value under £1,700
 it's owned by a trustee for sequestration, liquidation or executors
 the company who owns it has been wound up
 by law, the property cannot be occupied
 it's under a compulsory purchase order
 it has no buildings (empty ground)
 the ratepayer is deceased 
3.3 On 31 January 2019 the Scottish Government committed to devolving empty
property relief to councils in time for the next revaluation. However both the
revaluation and the devolution of EPR were delayed because of the pandemic
and the go-live date for the devolved EPR is 1 April 2023. The Council has to
have an agreed policy before that date otherwise it cannot grant EPR relief
from 1 April 2023 to any business or business owner. 
3.4 Currently 375 businesses in Argyll and Bute benefit from Empty Property Relief.
The value of that relief is £761,269 per annum. This relief can be further broken
down to the following categories; 
1. Properties that receive or have received 50% EPR for 3 months followed
by a 10% discount. There are 110 properties in this category receiving
£42,571 of relief.
2. Industrial Properties that receive 100% relief for 3 months followed by 10%
discount. There are 4 properties in this category receiving £5,565 of relief.
3. Businesses that get 100% relief for the whole time a property is
unoccupied, in the categories:
a. listed buildings - 79 properties receiving £379,790 of relief
b. rateable value under £1,700 - 176 properties receiving £63,029 of
relief
c. owned by a trustee for sequestration, liquidation or executors - 1
property £237,546 of relief
d. the company who owns it has been wound up - 0 properties
e. by law, the property cannot be occupied – 1 property, £3,785 of
relief
f. it's under a compulsory purchase order - 0 properties
g. no buildings (empty ground) - 5 properties £12,475 of relief
h. ratepayer is deceased – 7 properties £16,509
Page 156

Page 157

3.5 The Scottish Government propose to use the Scottish Fiscal Commission empty
rates forecast to provide £105 million to Scottish local authorities for each of the
three financial years from 1 April 2023, 1 April 2024 and 1 April 2025. There will
be no inflationary increase in the devolved monies between these years and there
has been no discussions regarding what happens after the 3 year agreement
ends. 
3.6 The Council will receive a proportion of the £105 million in grant funding. The
Council then has three broad choices to make; 
1. Administer the scheme as it is granting businesses the same level of relief
they currently get and using the funding provided by the Government to
cover the costs of the relief afforded to businesses.
2. Make the relief scheme much tighter and available to fewer businesses
thereby offering less relief for empty properties. The difference between
the relief granted and the grant funding provided by the government can
then be used by the Council in any way they see fit. 
3. Make the relief scheme more generous than the current scheme offering
businesses even more support and therefore using some of its own
reserves to cover additional relief afforded to businesses over and above
the level of Scottish Government grant. 
3.7 There are risks for local authorities with devolved EPR around the impact of big
businesses with lands and heritages attracting large rateable values shutting
down after 1 April 2023 and leaving their premises empty. This could leave local
authorities facing the prospect of funding empty relief themselves at a much
higher level than they are being funded for by the Scottish Government. 
3.8 Scottish Government have indicated that there will be a tolerance level set as part
of the devolvement of EPR. This will allow local authorities to enter dialogue with
Scottish Government should the basis for the agreement to devolve EPR change
significantly as a result of a material change in circumstances out with local
authority control. At this stage we don’t know what that level of tolerance will be. 
3.9 The Scottish Government has yet to confirm the basis for apportioning the funds
between Scottish Local Authorities or the value of the funding they will give to
individual local authorities to support their schemes. 
3.10 The results of the revaluation for 1 April 2023 will not be published by
Dunbartonshire and Argyll and Bute Valuation Joint Board until the end of
November 2022. The impact of which could affect the value of the relief currently
afforded to empty properties. 
3.11 At this stage it is not possible to suggest how the Council might want to run their
own EPR scheme without knowing how much money the Scottish Government
will allocate to support the scheme. Additionally the Assessor is currently
conducting a large scale revaluation of lands and heritages in the area and it may
be easier to consider a policy for EPR once the process is complete. 
Page 157

Page 158

3.12 The Council will conduct its own Empty Property relief review and consult
colleagues from Economic Development, business owners and Elected Members
before deciding how best operate its own scheme from 1 April 2024 onwards. 
3.13 The consultation will consider whether we charge NDR on empty properties, if so
how much to charge, and whether we should we charge double NDR like we do
Council Tax for long term empty for example. Consideration also needs to be
given to the resources that would be required to support a change in the scheme,
what our options are, and what best stimulates our economies. 
4. CONCLUSION 
4.1 Devolving EPR to then Council brings opportunities to generate more local tax
income and/or to help stimulate economic growth in our area. We currently offer
£761,269 of relief which the Scottish Government reimburse us for through the
Revenue Support Grant, and this indicates the value of the scheme for the
Council. There will be a range of options open to the Council for a new scheme
for Empty Properties on NDR however it is proposed in the first instance to run
the scheme the same way as current in order to conduct reviews and consult
stakeholders as to the most appropriate way to deal with empty property relief
from 1 April 2024 onwards. 
5. IMPLICATIONS 
5.1 Policy – This is a new policy for Empty property relief in non-Domestic Rates. 
5.2 Financial – The policy will not have an impact on finances in year 1 however it
could generate up to £0.769 million in additional NDR income in future years
depending on the Council’s policy going forward and confirmation of the funding
offered by Scottish Government.   
5.3 Legal - None 
5.4 HR - None 
5.5 Fairer Scotland Duty - None 
5.5.1 Equalities – None
5.5.2 Socio-Economic Duty – None
5.5.3
5.6
Islands Duty – None
Climate Change - None
5.7 Risk – None.
5.7 Customer Service - None 
Anne Blue
Head of Financial Services
27 September 2022 
Policy Lead for Financial Services and Major Projects:  Councillor Gary
Mulvaney 
For further information please contact Fergus Walker, Revenues and Benefits
Manager Tel 01586-555237
Page 158

Page 159

ARGYLL AND BUTE COUNCIL     POLICY & RESOURCES COMMITTEE                                                                          
DEVELOPMENT & ECONOMIC GROWTH           13TH OCTOBER 2022 
CONSERVATION AREA REGENERATION SCHEME (CARS) PROJECT – 104-110
ARGYLL STREET, DUNOON 
1.0 EXECUTIVE SUMMARY 
1.1 The Dunoon Conservation Area Regeneration Scheme (CARS) is a grant
programme focussing on the regeneration of historical buildings as well as
traditional skills training and community engagement. Dunoon CARS is jointly
funded by Historic Environment Scotland and Argyll and Bute Council.
1.2 Argyll and Bute Council have recognised a need for greater economic
development and regeneration activities within Dunoon particularly the town
centre. 
1.3 106- 110 Argyll Street is the Dunoon CARS final priority building and comprises
of two ground floor commercial units and two first floor flats. The aim is to bring
the building back to a good level of repair allowing 3 commercial and 1
residential unit to be brought back into use and improving 1 other residential
unit.
1.4 The Dunoon CARS Officer, Empty Homes Officer and Housing Improvement
Officer have been working with this property since 2019. Delays due to COVID &
ownership have meant the original projected costs have escalated above the
remaining CARS budget by £75,000.  The Private Sector Housing Grant
(PSHG) budget for 2022/23 is well within budget, and providing the gap funding
to facilitate this project aligns with the key aims of the PSHG to extend the life of
capital assets. 
RECOMMENDATIONS 
Members consider and  approve the utilisation of the Private Sector Housing
Grant (PSHG) to award an additional £75k grant to the 106-110 Argyll Street
Dunoon CARS project, thus providing essential gap funding to facilitate the
restoration of these buildings. 
Page 159 Agenda Item 8

Page 160

ARGYLL AND BUTE COUNCIL     POLICY & RESOURCES COMMITTEE                                                                          
DEVELOPMENT & ECONOMIC GROWTH           13TH OCTOBER 2022 
CONSERVATION AREA REGENERATION SCHEME (CARS) PROJECT – 104-110
ARGYLL STREET, DUNOON 
2.0 INTRODUCTION 
2.1 This report outlines the gap funding that exits in the final priority building of the 
Dunoon Conservation Area Regeneration Scheme (CARS).  The CARS is jointly
funded by Historic Environment Scotland and Argyll and Bute Council. The
report requests utilisation of an additional £75,000 grant funding from the PSHG
to cover that gap and facilitate this key project.   
3.0 RECOMMENDATIONS 
3.1 Members approve the utilisation of the Private Sector Housing Grant (PSHG) to
award an additional £75k grant to the 106-110 Argyll Street Dunoon CARS
project, thus providing essential gap funding to facilitate the restoration of these
buildings. 
4.0 DETAIL 
4.1 106 - 110 Argyll Street is the Dunoon CARS final priority building and comprises
of two ground floor commercial units and two first floor flats. It is located in a
prominent position along Dunoon’s main shopping street and is directly across
the road from the August 2021 fire site. One of the residential units is not fit for
human habitation and has been classified as an empty home due to the wet rot
caused by the level of water ingress into the property, both commercial units are
also vacant due to water ingress issues. 
4.2 The property at 104 Argyll Street shares a chimney, parapet gutter, downpipes
and skews with 106-110 and has agreed to pay their share of the common
works. 104 consists of a two storey commercial unit which is also currently
vacant due to water ingress issues.
Page 160

Page 161

4.3  106-110 Argyll Street needs a new roof, rainwater goods and extensive rot
works to make it wind and watertight. The aim is to bring the building back to a
good level of repair to allow the 3 commercial and 1 residential unit to be
brought back into use. The health and wellbeing of the tenant in the other
residential unit will also be improved due to the works.
4.4  The Dunoon CARS Officer, Empty Homes Officer and Housing Improvement
Officer have been working with this property since 2019. The hope was to get
the works started in 2020, however, covid and the sale of the TSB bank (110
Argyll Street) put this project on hold. We finally made contact with the new
owners of 110 Argyll Street in late 2021 and the project resumed but by this time
the construction and material rates had risen to above what we had left in the
CARS budget.
4.5  The CARS priority building grants are normally 80% of the total eligible project
costs. Unfortunately due to the above reasons, we only have 56% to offer on
this project and there is a £75,000 project shortfall as shown in the bullets
below, and without which the works cannot proceed:
 Total project cost based on the tender returns and value engineering -
£285,000
 Total CARS grant available from Historic Environment Scotland and A&B
Council - £160,000 
 The current eligible calculated PSHG - £30,000
 Total owners contributions - £20,000.00 
 Shortfall is currently - £75,000 
4.6  The proposal is to utilize additional grant funding from the PSHG to fill the
£75,000 gap. PSHG should be spent on capital projects such as; adding value
to an asset, extending the life of an asset, or acquiring a new asset. The
proposed works described in this paper meet the finance parameters for PSHG
spend.  Although this is a larger grant level than usual for PSHG it will fall well
within the available PSHG budget remaining for this financial year which would
otherwise remain unspent, and will facilitate the completion of this key project
within the Dunoon CARS scheme. 
5.0 CONCLUSION 
5.1 The additional funds proposed would safeguard the fabric of the building,
provide the best opportunity for 3 commercial units and one residential units to
be brought back into use, and greatly improve the health and wellbeing of the
occupiers of an additional residential unit.  
5.2 The project has brought the owners closer and an Owners Association has been
formed. A tenement condition survey has been carried out and the report and
Page 161

Page 162

cost plan will provide the Association with the maintenance schedule for future
works.
5.3 This project cannot go forwards without the additional funding, and facilitating it
from within the otherwise unspent PSHG budget will allow the completion of the
final priority Dunoon CARS building. 
6.0 IMPLICATIONS
6.1 Policy - The Outcome Improvement Plan, Economic Strategy and Local
Development Plan support town centre regeneration and a diverse and
thriving economy. 
6.2 Financial The proposed use of PSHG grant funding falls within the criteria for
use of PSHG and will appropriately utilise capital budget which will
otherwise remain unspent in this financial year. 
6.3  Legal – Grant contracts will be provided to third parties. 
6.4  HR - A dedicated project officer has been recruited for the duration of the
Dunoon CARS project. Staff salaries are included within the project budget. 
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics - None 
6.5.2   Socio-economic Duty - None 
6.5.3  Islands – None 
6.6 Climate Change – Extremes of weather caused by climate change will
continue to put buildings under pressure. These projects help property owners
undertake large scale maintenance projects under the supervision of
conservation accredited architects which ensures they are future proofed
against climate change, using traditional building materials.    
6.7 Risk - That grant schemes are undersubscribed or that projects run over time
or budget. These risks will be carefully monitored and mitigation measures
introduced on a case by case basis. 
6.8  Customer Service - The council is responsible for administering the CARS
grants on behalf of HES and for ensuring due diligence in the performance of
its duties. 
Kirst Flanagan Executive Director with responsibility for Development and
Economic Growth 
Councillor Robin Currie, Policy Lead for Economy and Rural Growth
29th September 2022 
Page 162

Page 163

For further information contact:
Claire Hallybone: Dunoon CARS Project Officer, Claire.Hallybone@argyll-bute.gov.uk
Douglas Whyte: Housing Team Leader, Douglas.Whyte@Argyll-Bute.gov.uk 
APPENDICES
Appendix 1: Photographs 
Photograph showing the front elevation of 104-110 Argyll Street, Dunoon 
Page 163

Page 164

Photograph showing the interior of 106 Flat 1 taken in January 2020 showing
the level of water ingress and rot 
Page 164

Page 165

ARGYLL AND BUTE COUNCIL  POLICY & RESOURCES COMMITTEE 
LEGAL AND REGULATORY SUPPORT   13th OCTOBER 2022 
COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 – UPDATE –
EXPRESSIONS OF INTEREST / ASSET TRANSFER REQUESTS/ REPORTING
REQUIREMENTS 
1.0 SUMMARY 
1.1 At the Meeting of the Policy and Resources Committee held on 11 August 2022, the
Committee were asked to note the attached report.  In terms of Standing Order 10.9
“In respect of any item on a committee agenda marked as for noting only, then the
only competent motion [other than to note] will be for the matter to be referred to the
next meeting of the committee as a substantive item”. 
1.2 The Committee unanimously agreed that the report would be referred to the next
meeting of the Policy and Resources Committee as a substantive item. 
2.0 RECOMMENDATIONS 
2.1 Members are asked to consider the attached report. 
3.0 IMPLICATIONS 
3.1  Policy - none
3.2 Financial - none
3.3 Legal - none
3.4 HR - none
3.5 Fairer Scotland Duty - none
3.5.1 Equalities - none
3.5.2 Socio-economic Duty - none
3.5.3  Islands - none 
3.6  Climate Change – none
3.7  Risk – none
3.8  Customer Service – none.   
Douglas Hendry, Executive Director with Responsibility for Legal and Regulatory
Support
13th October 2022 
For further information contact: 
Shona Barton, Committee Manager
shona.barton@argyll-bute.gov.uk 
Appendix 1 – Report by Executive Director with Responsibility for Commercial Services
“Community Empowerment (Scotland) Act 2015 – Update – Expressions of Interest/Asset
Transfer Requests/ Reporting Requirements” 
Page 165 Agenda Item 10

Page 166

This page is intentionally left blank

Page 167

1 
ARGYLL AND BUTE COUNCIL        POLICY AND RESOURCES
COMMITTEE       
COMMERCIAL SERVICES                                 11th AUGUST 2022 
COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 – UPDATE – EXPRESSIONS
OF INTEREST / ASSET TRANSFER REQUESTS / REPORTING REQUIREMENTS 
1. EXECUTIVE SUMMARY 
1.1  The purpose of this report is to advise the Policy and Resources Committee on: 
 The operation of the processes in regard to formal Asset Transfer Requests
(ATR) and Participation Requests in terms of the Community Empowerment
(Scotland) Act 2015;
 Current live informal Expressions of Interest (EOI’s) which may become
subject to a formal asset transfer request or be dealt with outwith the formal
asset transfer request process;
 Current live ongoing or agreed Participation Requests received by the Council;
and
 The annual reporting requirements in respect of Asset Transfer Requests and
Participation Requests set out in Section 95 and 32 of the Community
Empowerment (Scotland) Act 2015 respectively. 
RECOMMENDATIONS 
1.2 It is recommended that: 
The Policy and Resources Committee note the report. 
Page 167

Page 168

2 
ARGYLL AND BUTE COUNCIL        POLICY AND RESOURCES
COMMITTEE 
COMMERCIAL SERVICES                                 11th AUGUST 2022 
COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 – UPDATE – EXPRESSIONS
OF INTEREST / ASSET TRANSFER REQUESTS/ REPORTING REQUIREMENTS 
2. INTRODUCTION
2.1 The purpose of this report is to advise the Policy and Resources Committee on: 
 The operation of the processes in regard to formal Asset Transfer Requests
and Participation Requests in terms of the Community Empowerment
(Scotland) Act 2015;
 Current live informal Expressions of Interest (EOI’s) which may become
subject to a formal asset transfer request or be dealt with outwith the formal
asset transfer request process;
 Current live ongoing or agreed Participation Requests received by the Council;
and
 The annual reporting requirements in respect of Asset Transfer Requests and
Participation Requests set out in Section 95 and 32 of the Community
Empowerment (Scotland) Act 2015 respectively. 
3. RECOMMENDATIONS 
It is recommended that: 
3.1 The Policy and Resources Committee note the report. 
4. DETAIL
4.1      The Council operates processes in compliance with parts 3 and 5 of the Community
Empowerment (Scotland) Act 2015 in regard to: 
 Asset Transfer Requests (ATR’s) (part 5 of the Act) which came into force on 23
January 2017.   ATR’s enable community bodies to make requests to all local
authorities, Scottish Ministers and a range of public bodies for any land or
buildings they feel they could make better use of. They can request ownership,
lease or other rights as they wish.
 Participation Requests (Part 3 of the Act) which came in to force on 1 April 2017.
These are requests to public bodies which, if granted, enable communities to
participate in decisions and processes which are aimed at improving outcomes.
Page 168

Page 169

3 
EXPRESSIONS OF INTEREST (EOIs)
4.2 There were thirteen (13) active Expressions of Interest (EOIs) (as at 31st May 2022)
and all active EOI’s are listed in Appendix 1. In the current year 7 EOI’s have been
received 1 of which was subsequently withdrawn. To date, since January 2017, 74
EOIs have been received of which 61 have been resolved or withdrawn. It should be
noted that the Council has continued to engage with community groups who have
had EOI’s active for a significant period of time and while they remain active the
requesters have not yet moved them on. There are currently no significant actions
outstanding for the Council in relation to these. 
4.3 Further, most EOIs would not progress or develop into a formal asset transfer
request. EOIs are dealt with in a way that seeks to deliver the outcome required by
the community group allowing the request to progress outwith the formal asset
transfer process. Some EOIs are also withdrawn for a variety of reasons such as the
group changing focus of what was needed, a better option becoming available or a
lack of time and resources to progress their plans. 
ASSET TRANSFER REQUESTS
4.4 The Council has put in place information, advice and guidance to community bodies
who are interested in making a formal ATR and further information on this can be
found on the Council’s website at https://www.argyll-bute.gov.uk/asset-transfer.
There have been 3 ATRs submitted following the implementation of the Act and as
at 31st May 2022 there were no active ATRs.
4.5 In May 2020 the Best Value Assurance Report prepared by Audit Scotland noted that
the Council had made good progress with the Community Empowerment Act but that
it needed to make the process easier to follow and accessible to all communities. The
Asset Transfer Request process is statutory and therefore has limited options to
make changes however the Asset Transfer Group have considered the Best Value
Improvement Plan and have worked to further develop the informal EOI process
simplifying  the approach for communities. This has also led to the development of a
section of the website to promote assets suitable for groups to work in partnership
with council services which will be trialled during 2022 as part of the improvement
plan actions.
4.6 Following on from the Best Value Assurance Report the Audit & Scrutiny Committee
undertook a scrutiny review of the Council’s Community Asset Transfer process. The
Panel concluded that:
 The Community Asset Transfer process is compliant with statutory
requirements.
 The process enables opportunity for engagement with community transfer
bodies.
 The process is supportive to community transfer bodies and communities. 
The review also identified a number of recommendations which have been
implemented or have been built into the processes moving forward.   
Page 169

Page 170

4 
PARTICIPATION REQUESTS 
4.7 Part 3 of the Community Empowerment (Scotland) Act 2015 provides a framework
for the use of participation requests by community bodies, with the intention of
enabling communities to have more influence over services and decisions which
affect them. Part 3 of the Act came into force on the 1st April 2017. 
4.8 In line with the requirements of the Act, the Council has put in place a procedure
which allows consideration of any requests made by community bodies. The
procedure and further information can be found on the Council’s website at
https://www.argyll-bute.gov.uk/find-out-more-about-participation-requests 
4.9 During the period 1 April 2021 to 31 March 2022, the Council received two participation
request, of which one was rejected. The Council was unable to progress the request
from Isle of Kerrera Development Trust as the outcome improvement was not within the
capacity of the Council to deliver as the ground was not in council ownership. The
request that was accepted from Garelochhead Community Council was developed in
conjunction with Police Scotland and the actions agreed were in respect of road safety
matters. 
ASSET TRANSFER AND PARTICIPATION REQUESTS - ANNUAL REPORTING
REQUIREMENTS 
4.10 Section 95 of the Community Empowerment (Scotland) Act 2015 requires the
Council to publish an annual report setting out the numbers of asset transfer
requests received and their outcomes. 
4.11 The report also requires to set out what the Council has done to 1: promote the use
of asset transfer requests and 2: support community bodies to make requests and
can be found on the Council’s asset transfer webpages here: https://www.argyll-
bute.gov.uk/asset-transfer 
4.12 Annual reports cover each year from 1 April to 31 March and must be published by
30 June. 
4.13 Section 32 of the Act also requires the Council to publish an annual report in respect of
Participation Requests setting out: 
 The number of requests received;
 The number of requests agreed and refused;
 The number of requests which resulted in changes to a public service provided by,
or on behalf of, the public service authority; and
 Any action taken by the public service authority to promote and support the use of
participation requests. 
4.14 Annual reports Participation Requests cover each year from 1 April to 31 March and
must be published by 30 June. The relevant report has been published on the
Council’s Participation webpages. 
5. CONCLUSION
5.1 This report advises the Policy and Resources Committee on the operation, of the
Page 170

Page 171

5 
processes in regard to Asset Transfer Requests and Participation Requests in terms of
the Community Empowerment Act 2015 and updates on ATR’s, EOI’s and Participation
Requests to date. 
5.2 It is recommended that the Policy and Resources Committee note the contents of the
report.  
6.  IMPLICATIONS
6.1 Policy – In line with council policy relating to Asset Transfer and Participation
Request processes.
6.2 Financial – None from annual reporting.
6.3 Legal – In line with statutory requirements of the Community Empowerment
(Scotland) Act 2015 and related Regulations.
6.4 HR – None.
6.5 Fairer Scotland Duty 
6.5.1 Equalities – Protected characteristics – None.
6.5.2 Socio economic Duty – None.
6.5.3 Islands – None
6.6 Climate change – None from annual reporting.
6.7 Risk – Failure to meet statutory requirements could have reputational
implications for the council. 
6.8 Customer Service – None. 
Douglas Hendry - Executive Director with responsibility for Commercial Services
Councillor Gary Mulvaney – Policy Lead, Finance and Commercial Services
Date: 27th June 2022 
For further information contact: 
Ross McLaughlin, Head of Commercial Services, 01436 658 914
David Allan, Estates and Property Development Manager, 01436 657 620
David Rennie, Partnerships Development Officer, 01700 501 371
Michael Nicol, Solicitor, Legal and Regulatory Services, 01546 604 468 
Page 171

Page 172

6 
Appendix 1 
Current Active Expressions of Interest (as at 31st May 2022) 
It should be noted that the Council has continued to engage with community groups who
have had EOI’s active for a significant period of time and while they remain active the
requesters have not yet moved them on. There are currently no significant actions
outstanding for the Council in relation to these. 
No Organisation Asset Summary of
Expression of
Interest
Current Status
1 Mid Argyll
Rugby Club
(MARC)
Kilmory Pony
Park show
ground
Request to lease
the ground for
development of
rugby facilities.
Terms agreed with MARC
and to be reported for
internal approval to proceed.
2 Islay
Development
Initiative
Kilarrow
Stables,
Islay
Request to acquire
the building to
convert to flats for
service workers
and community
uses.
Main building is currently
operational and part of wider
assessment of office space.
3 Kirkmichael
Community
Development
Group
Kirkmichael
Park Changing
Room
Request to lease
pavilion and
grounds for use as
an office and to
deliver wider
services.
Group are being supported
to develop their business
plan for the proposal. 
4 Barbara's
Wildlife
Rescue
Ground at
Hafton, Dunoon
Request to lease /
acquire ground for
an animal rescue
centre
Group have been seeking a
suitable site and are
assessing the feasibility of
this site.
5 Scenic
Sandbank
Former Teacher
Centre
Sandbank
Request to
purchase the site
and develop a
community garden.
Group assisted to secure an
independent valuation and
are applying to the Land
Fund to support the
acquisition of the ground.
6 South Islay
Development
Ramsay Hall Request to
purchase the
building to
redevelop the
facility and operate
the services.
Detailed plans provided by
the group require to be
assessed in conjunction with
Education and the Care
Commission as the proposal
involves a nursery use.
7 Rhu and
Shandon
Community
Centre
Rhu Community
Centre
Request for lease
to assist in
applying for
development
funding for the
building
Terms are under discussion
but the approach requires to
be consistent with other
halls / community facilities.
Page 172

Page 173

7 
8 Kilfinan
Community
Forest
Company
(KCFC)
Tighnabruaich
Primary School
Grazings
access
Request to acquire
ground to
formalise access.
Group assisted to secure an
independent valuation and
are applying to the Land
Fund to support the
acquisition of the ground.
9 Dunoon
Foodbank
Former
Dunoon
Youth
Centre,
Dunoon
Request for a
lease of the
property to
continue and
expand their
services.
Temporary Licence to
occupy granted and
upgrade works costed.
Lease to be concluded
when group established as
a SCIO.
10 Isle of Jura
Development
Trust
Picnic area at
Craighouse
Pier, Isle of
Jura
Request for a
lease of the site to
improve the
facilities and install
a container for use
as a bakery to
support local
business.
Initial stages of background
checks being undertaken.
11 The Dunoon
Project Ltd
Morag’s Fairy
Glen & Bishop’s
Glen, Dunoon
Request to acquire
the sites to support
the delivery of the
wider project and
improve the public
access and
facilities.
Initial stages of background
checks being undertaken.
Legal Services involved as
proposal involves former
reservoir.
12 Ardrishaig
Community
Food Growing
Project
King George V
Park, Ardrishaig
Request to lease
part of park as a
community food
growing area.
Initial stages of background
checks being undertaken.
13 Dunoon
Youth
Football
League
Black Park,
Dunoon
Request to take
over management
of the Black Park
area to improve
facilities
Initial stages of background
checks being undertaken. 
Page 173

Page 174

This page is intentionally left blank

Page 175

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
LEGAL AND REGULATORY SUPPORT  13 OCTOBER 2022 
EXTRACT OF MID ARGYLL, KINTYRE AND THE ISLANDS AREA COMMITTEE
HELD ON 7 SEPTEMBER 2022 
14. * 9. TARBERT AND LOCHGILPHEAD REGENERATION FUND 
15. 
The Committee considered a report which provided an update on the projects which
have been undertaken funded by the Tarbert and Lochgilphead Regeneration Fund
and sought approval for the allocation of any unspent funding from the Lochgilphead
Front Green Project to support the delivery of the Ardrishaig North Public Realm
project:- 
Decision 
The members of Mid Argyll, Kintyre and the Islands Area Committee agreed 
1. To note the progress made with the projects as detailed within the report; and 
2. Recommended to Policy and Resources Committee the transfer of any unspent
funding from the Lochgilphead Front Green project to support the ongoing delivery of
the Ardrishaig North Public Realm project. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth Public Document Pack, submitted) 
Page 175 Agenda Item 11

Page 176

This page is intentionally left blank

Page 177

ARGYLL AND BUTE COUNCIL  MID ARGYLL, KINTYRE AND THE      
ISLANDS AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
7 SEPTEMBER 2022 
TARBERT AND LOCHGILPHEAD REGENERATION FUND – PROJECTS UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides an update on the 6 projects which Mid Argyll, Kintyre and
the Islands Area Committee agreed on 6 September 2017 focusing on those
projects which have not previously been reported to committee as complete. 
Lochgilphead Front Green (LA10) 
1.2 The main body of works were completed by 12 August 2022 and the site
reopened that evening. An opening ceremony is planned following completion
but details for this have yet to be agreed. 
1.3 We procured the works at Lochgilphead during a time of considerable uncertainty
with the ongoing Covid pandemic and other changes such as the UK leaving the
EU. In order to protect the Council’s position, the project entered the construction
phase with a considerable contingency allowance attached to anticipated risks.
At the time of writing, we believe that there is likely to be approximately £55,000
of contingency remaining once all costs associated with the project have been
covered, the exact amount cannot be confirmed until all commercial matters have
been settled with the contractor. We are asking Committee to continue with this
pragmatic approach and enable any surplus funding from the Lochgilphead Front
Green Project to be allocated to the Ardrishaig North Public Realm project which
is due to start on site shortly. 
Ardrishaig North Public Realm (LA13) 
1.4 Following appointment of P1 Solutions Ltd as the main contractor for this project
work on site is expected to commence on 29 August 2022. The contractor
indicates that there should be a construction period of eight months. During the
construction period the contractor will minimise disruption as much as possible
but the site will require closure to ensure the safety of members of the public and
site workers. Updates on the project are being issued by email to interested
parties and published on the Council’s website at www.argyll-
bute.gov.uk/ardrishaig/public-realm. 
Page 177

Page 178

Ardrishaig Gleaner Site (LA17) 
1.5 There have been a number of discussions between the Head of Development
and Economic Growth and senior members of Scottish Canals in relation to
Phase 2 of the site and how that could be developed. Whilst there are no firm
proposals at this stage we believe that it is beneficial to retain the allocated funding
against the phase 2 and that proposals will continue to be developed. We are
looking at whether there is an opportunity to gain support for development of this
site through the Rural Growth Deal via the tourism and place element of funding. 
RECOMMENDATIONS 
Members of the Mid Argyll, Kintyre and the Islands Area Committee are asked to: 
1. Note the progress made with the projects as detailed within the report; and
2. Recommend to Policy and Resources Committee the transfer of any unspent
funding from the Lochgilphead Front Green project to support the ongoing
delivery of the Ardrishaig North Public Realm project.     
Page 178

Page 179

ARGYLL AND BUTE COUNCIL  MID ARGYLL, KINTYRE AND THE      
ISLANDS AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
7 SEPTEMBER 2022 
TARBERT AND LOCHGILPHEAD REGENERATION FUND – PROJECTS UPDATE 
2.0 INTRODUCTION 
2.1 This report provides an update on the 6 projects which Mid Argyll, Kintyre and
the Islands Area Committee agreed on 6 September 2017 (ratified by Policy and
Resources Committee) should form the Tarbert and Lochgilphead Regeneration
Fund and proceed to full business case. The projects include:  
Project
Ref.
Project  Status
T02 Barmore Road (A83)/Garvel Road junction
improvement
Complete
T11 Tarbert Harbour facilities Complete
LA10 Lochgilphead Front Green Ongoing at time of
writing report
LA11 Argyll Street Complete
LA13 Ardrishaig North Public Realm Improvements Ongoing
LA17  Gleaner Oil Site  Phase 1
complete, phase 2
ongoing 
Whilst some projects have been successfully completed, as agreed, our focus is
now on successfully delivering the remaining agreed projects. The report below
provides an update on the remaining ongoing projects. 
3.0 RECOMMENDATIONS 
3.1 Members of the Mid Argyll, Kintyre and the Islands Area Committee are asked to: 
1. Note the progress made with the projects as detailed within the report; and
2. Recommend to Policy and Resources Committee the transfer of any unspent
funding from the Lochgilphead Front Green project to support the ongoing
delivery of the Ardrishaig North Public Realm project. 
Page 179

Page 180

4.0 DETAIL 
Lochgilphead Front Green (LA10) 
4.1 Works started on the Lochgilphead Front Green project on 31 May 2021
following the appointment of contractors Hawthorn Heights Limited in March
2021. During the course of the project, we have been able to add in a number of
elements of the project which were removed during a value engineering
exercise. As works progressed, it became clear that some of the contingency
allocated to identified risks would not be required and as such we were able to
include in the contract the landmark and car parking signage which was
something that members had been keen to see included. We also extended the
natural stone in the square so that it meets the seating wall, this was felt to be
beneficial in terms of long term maintenance, and upgraded the grass works to
the coastal edge from seeding to turf. Additional Town Centre Funding enabled
us to upgrade and extend the A83 footway works and change the surface finish
from resin bound gravel to natural stone to match into the works completed in
Colchester Square and Argyll Street as well as extending works in front of the
public toilets building. All of these works have added additional time to the works
on the Front Green. 
4.2 The project has also been impacted by delays some of which are being widely
experienced across the construction industry and are impacting availability of
site labour, supplies and materials. As a result of the additional works and the
other delays, the completion date for the works moved from the end of January
2022 to 12 August 2022. The majority of the site was reopened to the public on
the evening of 12 August 2022. Some parts of the site were closed off to enable
recently laid turf to establish and the remedial works to the site compound are
still required to be completed, following the removal of site welfare facilities this
part of the site will be seeded with grass which will also require time to establish. 
4.3 An opening ceremony is planned following completion but details for this have
yet to be agreed. A 12 months defects period will follow completion and it is
anticipated that a number of works will be required during this period. 
4.4  A schedule of before and after photographs is included at Appendix 1. 
4.5 The funding allocated for the Lochgilphead Front Green project has enabled us
to attract external funding into the area, for every £1 of funding through the Tarbert
and Lochgilphead Regeneration Fund a further additional 30p of external funding
has been attracted to the project. 
4.6 We procured the works at Lochgilphead during a time of considerable uncertainty
with the ongoing Covid pandemic and other changes such as the UK leaving the
EU. In order to protect the Council’s position, the project entered the construction
phase with a considerable contingency allowance attached to anticipated risks.
As the project progressed, some of the contingency has been expended and, as
detailed above, some of this has been released to enable additional works to be
undertaken. At the time of writing, we believe that there is likely to be
Page 180

Page 181

approximately £55,000 of contingency remaining once all costs associated with
the project have been covered, the exact amount cannot be confirmed until all
commercial matters have been settled with the contractor. 
4.7 Previously when funding has remained available at the end of a project, it has
been agreed that this should be transferred into other ongoing Tarbert and
Lochgilphead Fund projects to enable them to progress. We are asking
Committee to continue with this approach and enable any surplus funding from
the Lochgilphead Front Green Project to be allocated to the Ardrishaig North
Public Realm project. 
Ardrishaig North Public Realm (LA13) 
4.8 Our previous report on this project identified that we had applied for funding from
Sustrans to help to deliver the works, the project had secured support and funding
from Sustrans for the design works. Unfortunately the funding application for the
construction phase was unsuccessful and as a result of this we were required to
undertake a period of value engineering and reduce the scope of works before
proceeding with the procurement exercise. This exercise was undertaken at a
time of significant volatility within the construction sector with prices for some
items raising exponentially over very short periods of time. 
4.9 In June 2022 we completed the procurement exercise and awarded a contract to
P1 Solutions Ltd. At the time of writing, the preconstruction phase is expected to
extend to the end of August with works on site commencing on 29 August 2022.
The works to be completed are shown on the drawing at Appendix 2. 
4.10 Information from the contractor indicates that there should be a construction
period of eight months and they expect to undertake works commencing in the
garden area between the car parks and working along the waterfront before
moving onto the car park and A83 frontage. 
4.11 During the construction period the contractor will minimise disruption as much as
possible but the site will require closure to ensure the safety of members of the
public and site workers. During the construction period there will be access to the
public toilets and the North Hall. Car parking on the Southern Car Park will be
unaffected however the north car park will be closed and is expected to be utilised
by the contractor for their compound. 
4.12 Updates on the project are being issued by email to interested parties and
published on the Council’s website at www.argyll-bute.gov.uk/ardrishaig/public-
realm. 
Ardrishaig Gleaner Site (LA17) 
4.13 This project is being delivered by Scottish Canals with a grant being provided
through the Tarbert and Lochgilphead Regeneration Fund. Phase 1 of the
Gleaner Site, the award winning Egg Shed, was completed in 2019. The Egg
Shed was recognised by the Royal Incorporation of Architects in Scotland (RIAS)
in their 2021 awards.
Page 181

Page 182

4.14 There have been a number of discussions between the Head of Development
and Economic Growth and senior members of Scottish Canals in relation to
Phase 2 of the site and how that could be developed. Whilst there are no firm
proposals at this stage we believe that it is beneficial to retain the allocated funding
against the phase 2 and that proposals will continue to be developed. We are
looking at whether there is an opportunity to gain support for development of this
site and the Crinan Canal through the Rural Growth Deal via the tourism and place
element of funding. 
5.0 CONCLUSION 
5.1 Funding through the Tarbert and Lochgilphead Regeneration Fund has
successfully completed a number of projects in Tarbert, Ardrishaig and
Lochgilphead.  The main focus of activity continues to be delivering the remaining
of the agreed six projects with work now focusing on Ardrishaig. There remain a
high number of risks associated with delivery of the remaining projects however
these will continue to be monitored and managed where possible. Should an
underspend remain once the agreed six projects have been completed this will
be reported to Committee so that arrangements can be agreed as to how this
should be allocated. 
5.2 An update on the projects will be made to Committee during 2023. 
6.0 IMPLICATIONS 
6.1 Policy 
The projects will support the overarching objective and long term
outcomes of the Council’s Corporate Plan, Argyll and Bute Outcome
Improvement Plan, the Local Development Plan, the Economic Strategy.
It will deliver the Tarbert and Lochgilphead Regeneration Fund. 
6.2 Financial 
A total of £3 million is allocated through the Tarbert and Lochgilphead
Regeneration Fund. Expenditure at August 2022 is £2,042,863.98
including the grants made for Tarbert Harbour and Gleaner Phase 1 site,
works completed at Garvel Road, Tarbert, Lochgilphead Front Green and
Ardrishaig North Public Realm. 
6.3  Legal 
Working with procurement colleagues in regard to management of
contracts and tendering process. Leases, licences and memorandums of
understanding with third party progressed by the legal team where
necessary. 
6.4  HR 
Support required from colleagues across the Council particularly Roads
and Infrastructure Services who are the asset owners for the Lochgilphead
Page 182

Page 183

Front Green and Ardrishaig North. 
6.5  Fairer Scotland Duty: 
6.5.1 Equalities - protected characteristics   
Equalities and Socio Economic Impact Assessments have been carried
out. 
6.5.2 Socio-economic Duty  
See above 
6.5.3 Islands 
No impacts anticipated. 
6.6. Climate Change 
Construction works undertaken as a result of the Tarbert Lochgilphead
Regeneration Fund will result in carbon emissions although it is
anticipated that these will be restricted to the construction period. Works
at Lochgilphead Front Green raise the ground level of part of the green
and may offer a form of climate change adaptation. 
6.7 Risk  
There remain a number of risks associated with all the ongoing projects
including those associated with external funding, public perception,
construction working, costs, covid-19 and Brexit etc. Project Risk
Registers are being maintained. 
6.8  Customer Service  
None at this time 
Kirsty Flanagan – Executive Director with responsibility for Development and  
Economic Growth 
Policy lead – Robin Currie 
16 August 2022 
Appendix 1 – Lochgilphead Front Green Photographs
Appendix 2 – Ardrishaig North Public Realm Landscape Plan 
For further information contact: 
Anna Watkiss, Senior Development Officer, Development and Economic Growth, Tel.
01546 604344  
Page 183

Page 184

APPENDIX 1 – Lochgilphead Front Green Photographs 
Before After      
Page 184

Page 185

Before After      
Page 185

Page 186

Appendix 2 – Ardrishaig North Public Realm Landscape Plan 
Page 186

Page 187

ARGYLL AND BUTE COUNCIL  POLICY & RESOURCES COMMITTEE 
DEVELOPMENT AND 
ECONOMIC GROWTH  
13th OCTOBER 2022 
ARGYLL AND BUTE COUNCIL EMPLOYABILIITY FINANCIAL AND SERVICE
PROVISION UPDATE   
1.0 HEADLINES 
1.1 The purpose of this paper is to provide members of the Policy and Resources
Committee with an update on the current financial position of Argyll and Bute
Council’s Employability Team aligned to current and proposed service provision
across the region. 
1.2 A summary of the latest financial performance for the first quarter and forecast spend
for the rest of 2022/23 is outlined in Appendix 1, Table 1. It should be noted that the
forecast figures does not include the proposed allocation for 2022/23 for employability
interventions that have been submitted to the UK Government within the Argyll and
Bute UK Shared Prosperity Fund (UKSPF) Investment Plan. 
1.3 At present the Council’s Employability Team, along with partners in the Argyll and
Bute Employability Partnership (ABEP), delivers a plethora of interventions funded by
the Scottish Government under the No One Left behind (NOLB) policy direction. In
addition the Employability Team delivers Fair Start Scotland on behalf of PeoplePlus.
In short, Argyll and Bute Council’s Employability Service, which sits under Economic
Growth, unlike other local authority Employability Services, has never been core
funded and successfully delivers and manages partner employability activity through
receipt of external revenue funding. These interventions are as follows: 
 Fair Start Scotland, 16 to 67 year olds (managed by PeoplePlus on behalf the
Scottish Government); 
 Argyll and Bute Employer Recruitment and Training Incentive (ABERTI),16 to 67
year olds;
 No One Left Behind: Employer Recruitment Incentives (ERIs) 25+ years;
 No One Left Behind: Pre-employment support for 25+ year olds (partner delivery);
 Parental Employability Support Fund (PESF), 16 to 67 year olds;
 Parental Employability Support Fund (PESF) for Employer Recruitment Incentives
(ERIs) 25+ years; 
 The Young Person’s Guarantee, 16-24 year olds (ERIs)
 The Young Person’s Guarantee (ERIs), 16-24 year olds (partner delivery) and
 NOLB Long Term Unemployed (LTU) 25+ years (partner delivery). 
1.4 The team is also concluding the delivery of the UK Government’s Kickstart Scheme
for 16 to 24 year olds. The Scottish Government has also indicated that additional
Child Poverty monies may be allocated to local authorities in the autumn of this year.
However, the exact detail of this funding allocation has yet to be confirmed. 
Page 187 Agenda Item 12

Page 188

2.0 RECOMMENDATIONS 
The Policy and Resources Committee are asked to note the content of this report. 
3.0 DETAIL 
Background of Argyll and Bute Council’s Employability Team 
3.1 At present the Council’s Employability Team, along with partners in the Argyll and
Bute Employability Partnership (ABEP), delivers a plethora of interventions funded by
the Scottish Government under the No One Left behind (NOLB) policy direction. In
addition the Employability Team delivers Fair Start Scotland on behalf of PeoplePlus.
In short, Argyll and Bute Council’s Employability Service, which sits under Economic
Growth, unlike other local authority Employability Services, has never been core
funded since its inception in 1999, and successfully delivers and manages partner
employability activity through receipt of external revenue funding. 
3.2 Along with input from the Economic Growth Manager the Employability Team comprises
of 5.7 FTEs (7 employees) which is a considerable cut from a team that comprised of
circa 26 externally funded employees when delivering previous policy packages such as
New Deal. 
Financial Performance 
3.3 A summary of the latest financial performance for the first quarter and forecast spend
for the rest of 2022/23 is outlined in Appendix 1, Table 1. As shown in Table 1,
employability provision, including that delivered by the Argyll and Bute Employability
Team, has had adequate income over the first quarter of 2022/23 and forecast to do
so for the rest of this financial year to cover known expenditure. 
3.4 It should be noted that the Argyll and Bute Employability Team will be in receipt of
other revenue funding in 2022/23 (an allocation of £78,997) for interventions that
have been submitted to the UK Government within the Argyll and Bute UK Shared
Prosperity Fund (UKSPF) Investment Plan subject to approval by the UK
Government, early autumn 2022. Furthermore, subject to approval, the Employability
Team will also receive a further allocation of £444,711 to deliver employability
interventions, as outlined in the Argyll and Bute UKSPF Investment Plan, until the
end of March 2025. 
3.5 For 2023/24 there will also be projected contingent liability spend of circa £214,000
for the Argyll and Bute Employability Team with respect to Employer Recruitment
Incentive (ERI) payments to employers, where this money has been allocated by the
Scottish Government in 2022/23 (as per Appendix 1, Table 1). This is due to the
duration of the 12 month ERI intervention, so activity will be required into 2023/24
from 2022/23. There will also be a further single grant offer allocation from the
Scottish Government, under NOLB for 2023/24, which is not yet known. There are
ongoing discussions with the Scottish Government on the potential to introduce multi-
annual funding for employability activity, but nothing has been decided to date. 
Page 188

Page 189

3.6 The Scottish Government has also indicated that additional Child Poverty monies
may be allocated to local authorities in the autumn of this year. However, the exact
detail of this funding allocation has yet to be confirmed. 
Employability Delivery through Argyll & Bute Employability Partnership 
3.7 At present the Employability Team, along with partners in the Argyll and Bute
Employability Partnership (ABEP), delivers a plethora of interventions funded by the
Scottish Government under the No One Left behind (NOLB) policy direction. A
summary of current activity by the Employability Team and partners is provided below
in Appendix 2, Table 2; more detail can be found in Table 3b within the ABEP
Delivery Plan, 2022-25. 
3.8 The ABEP Delivery Plan, 2022-25 is a working document that provides a platform for
partners and stakeholders delivering employability services across Argyll and Bute to
work together to identify opportunities, align priorities, learn from each other, develop
valued services and ultimately add value to every engagement with supported
individuals. 
3.9 Argyll and Bute Council is the accountable body for the ABEP. All intervention
outcomes and associated spend is monitored and reported to the Scottish
Government by the Employability Team. 
Performance Challenges 
3.10 The Employability Team, as a key member of the ABEP, recognises that stronger and
more collaborative partnership working, focused on a place-based person-centred
approach, is helping to ensure suitable opportunities for individuals of all ages and
capabilities through tackling socio-economic disadvantage, inequalities and removing
multiple barriers to securing sustainable employment. However, there are still
performance challenges as follows: 
 Failure to recruit additional suitable staff has had a major impact on the
Employability Team’s ability to deliver the desired level of support whilst
maximising the funding allocation from the Scottish Government. 
 Late issue of grant offer letters (during year of service delivery) and hard stop
spends imposed by the Scottish Government has resulted in underspends due to
extremely tight timescales. 
 The delay of Scotland Excel’s procurement process to allow services to be
commissioned for 2023/23. Discussions are taking place with the Council’s
Procurement Team to focus on compliant and continuity of current service delivery
to ensure no one is left behind due to delayed processes. 
 COVID-19 had reduced the number of expected participants and employers
accessing support. However, this situation is beginning to ease with the uptake
starting to increase. 
Page 189

Page 190

4.0 CONCLUSION 
4.1 This paper provides members of the Policy and Resources Committee with an update
on the current financial position of Argyll and Bute Council’s Employability Team and
delivery partners aligned to current and proposed service provision across the region. 
4.2 By working together with external contractors and partners, the Employability Team
strives to offer a robust and financially sustainable approach to the delivery of the
employability provision across Argyll and Bute. Combining staff’s skills, strengths and
experience will allow for maximum benefit to be delivered to vulnerable individuals
across the whole of Argyll and Bute’s urban, rural, remote rural and island
communities. 
4.3 In such a challenging environment, the Employability Team is constantly aware that
contractual performance in terms of starts and job outcomes needs to be sustained
on a month-by-month basis going forward to enable income streams to continue to
cover service costs. Current funding from the Scottish Government and the proposals
in the UKSPF Investment Plan takes account of the capacity / management fee
funding to support delivery. This approach is really welcomed, particularly as the
Employability Team is fully funded externally. 
5.0 IMPLICATIONS 
5.1  Policy - the current employability service provision fits and contributes to Outcome 3:
Education, skills and training maximises opportunities for all and Outcome 5: People
live active, healthier and independent lives in the Local Outcome Improvement Plan
(LOIP). The service also fits and contributes to the Argyll and Bute Council priority:
‘Argyll & Bute Council will be a mental health champion, promoting good health and
helping people back into employment when necessary’ and the inclusive ‘skills for
work’ focus outlined in the Council’s Economic Strategy. 
5.2 Financial - the Council’s Employability Team is funded on a commercial basis through
the delivery of challenging service delivery contracts. The team also provides an
accountable body function for the ABEP in terms of monitoring financial spend and
outcomes. 
5.3 Legal - all appropriate legal implications will be taken into consideration. 
5.4 HR - difficulty in recruiting for posts where funding was sourced externally. 
5.5 Fairer Scotland Duty - the Fairer Scotland Duty, Part 1 of the Equality Act 2010, came
into force in April 2018. The duty places a legal responsibility on particular public
bodies in Scotland, such as Argyll and Bute Council, to pay due regard to (actively
consider) how they can reduce inequalities of outcome, caused by socio-economic
disadvantage, when making strategic decisions and how this has been implemented.
This is a core function of the Council’s Employability Team. 
5.5.1 Equalities - all activities will comply with all Equal Opportunities/Fairer Scotland Duty
policies and obligations. 
5.5.2 Socio-economic Duty - all project activities will comply with the council’s socio-
Page 190

Page 191

economic duty. 
5.5.3  Islands - employability services are delivered across the whole of Argyll and Bute
including the island communities. 
5.6  Climate Change – the current telephone and online delivery has decreased travel
and the Employability Team’s carbon footprint. 
5.7  Risk – cost of living crisis may result in more vulnerable people needing support
across Argyll and Bute within finite resource constraints. 
5.8  Customer Service – None.   
Kirsty Flanagan, Executive Director responsible for Economic Growth 
Councillor Robin Currie: Policy Lead for Economy and Rural Growth
13th October 2022 
For further information contact: 
Ishabel Bremner, Economic Growth Manager 
ishabel.bremner@argyll-bute.gov.uk 
Page 191

Page 192

Appendix A: Latest Financial Position - Employability Provision under NOLB 
Table 1: Latest Financial Positon for Argyll & Bute Employability Team and Partner Employability Provision (£)
Income Position at 31st
March 2022 Apr-June 22/23 Projected
July-Mar 22/23 Totals
Balance brought forward from 2021/22 415,492.94    415,492.94
Employability Income    
Fair Start Scotland Service Fee @ 7,330 per month (June 22
to March 23 outstanding - current funding contract will cease
31/03/2023) 
25,659.83  73,300.00  98,959.83 
Fair Start Scotland Projected Job Outcomes June 22 to
March 23 outstanding (based on current participants in work)  8,248.57  53,664.04  61,912.61 
Management/Admin Recharge Employability Team  37,288.61  104,099.69  141,388.30 
Scottish Government - 2021/22 General Revenue Grant
(GRG) - NOLB, PESF, YPG, LTU (not yet credited to
Employability ledger) 
238,404.50 715,213.50  953,618.00 
Scottish Government - Single Grant Offer General Revenue
Grant - NOLB  228,017.65  228,017.65 
Scottish Government - Single Grant Offer General Revenue
Grant - PESF  149,219.53  149,219.53 
Scottish Government - Single Grant Offer General Revenue
Grant - YPG  237,851.01  237,851.01 
Scottish Government - Single Grant Offer General Revenue
Grant – LTU  280,000.00  280,000.00 
Kickstart Scheme  20,005.08  7,350.89  27,355.97 
Total Income 415,492.94  329,606.59  1,848,716.31  2,593,815.84 
Page 192

Page 193

Table 1: Latest Financial Positon for Argyll & Bute Employability Team and Partner Employability Provision (£) (continued)
Expenditure Position at 31st
March 2022 Apr-June 22/23 Projected July-Mar
22/23 Totals
Employability Expenditure    
Staffing Costs Employability Team (to include latest pay
offer)  41,311.78  166,035.93 207,347.71 
Running costs Employability Team (e.g. staff travel,
premises, etc. but excluding salaries)  1,905.77  7,600.00  9,505.77 
Payments to ABERTI Employers  8,500.00 17,500.00 26,000.00
Payments to NOLB 25+ ERI Employers  1,500.00  25,500.00  27,000.00 
Payments to PESF ERI Employers  55.00  14,945.00  15,000.00 
Payments to CLD/LEP Partners for delivery of NOLB/YPG  107,028.98  204,133.76  311,162.74 
Proposed PESF Work Placements - GRG monies   80,000.00  8,000.00 
Proposed commissioning/grant offer to deliver NOLB - 22/23
monies   177,251.29  177,251.29 
Proposed commissioning/grant offer to deliver PESF - 22/23
monies   76,566.26 76,566.26 
Proposed commissioning/grant offer to deliver YPG - 22/23
monies   214,065.91  214,065.91 
Payments to CLD/LEP Partners for delivery of LTU - 22/23
monies   280,000.00  280,000.00 
Payments to CLD/LEP Partners for management and admin
of LTU - 22/23 monies   28,000.00  28,000.00 
Management/Admin Recharge  37,288.61  104,099.69  141,388.30 
Payments to YPG Employers  46,268.80  66,500.00  112,768.80 
Payments to ABC YPG Apprentices  25,060.72  4,195.93  29,256.65 
Payments to Kickstart Employers  17,668.33  7,350.89  25,019.22 
Participant Costs - Travel/Training/PPE  2,908.91  44,000.00  46,908.91 
Scottish Government - 2019/20 and 2020/21 NOLB/PESF
recovery (underspend due to late receipt of grant offer letters,
COVID and failure to recruit suitable additional staff) 
237,960.85  237,960.85 
Total Expenditure  289,496.90  1,755,705.51  2,045,202.41 
Overall Balance  415,492.94 40,109.69  93,010.80  548,613.43 
Page 193

Page 194

Appendix 2: Summary of Provision through the Argyll & Bute Employability Partnership 
Table 2: Summary of Current Provision through Argyll & Bute Employability Partnership 
Intervention Description  Delivery Partner Source of Investment
and volume
Outcomes to date
Fair Start Scotland, 16 to 67
year olds
(see: Fair Start (argyll-
bute.gov.uk) 
Fair Start Scotland helps people
who want to work but find it
difficult based on their
circumstances, 
People Plus and Argyll and
Bute Council’s Employability
Team
Scottish Government 302 participants, aligned to
JobCentrePlus locations:
 67 Helensburgh
 72 Campbeltown
 34 Rothesay
 49 Dunoon
 80 Oban
Across the Highlands and Islands
area starts continue to be low
Through the preparation of a
Marketing Action Plan the team
continues to encourage people to
sign up, with a reduced
unemployment rates and increasing
cost of living this is proving to be a
challenge.
Argyll and Bute Employer
Recruitment and Training
Incentive (ABERTI), 16 to 67
year olds
Applications for this fund ceased
at 31/03/22, but activity still
being delivered.
Argyll and Bute Council’s
Employability Team
Approval to accrue all
21/22 underspent
monies to 22/23 has
been granted by the
Cabinet Secretary and
the  Memorandum of
Understanding
received
A total of 37 participants and 28
employers were supported. To date
29 participants have completed the
52 week funded period or left early,
22 (76%) are in employment; 15
(68%) of which retained by the
employer accessing the funding
and 7 (32%) have moved to
another employer.
No One Left Behind (NOLB) -
Employer Recruitment
Incentives (ERIs) 25+ Years
(see: https://www.argyll-
bute.gov.uk/helping-people-
work and https://www.argyll-
bute.gov.uk/sites/default/files
/1._employer_information_le
aflet_nolb_-_eri.pdf)
Applications are now invited in
respect of the ERIs of up to
£6,000 per person. 
This allows unemployed people
aged 25+ years the opportunity
to move into permanent or a
fixed term employment contracts
of up to 18 months or more. 
Three of our Local
Employability Partners now
support 46 NOLB pre-
employment participants aged
25+. 
2022/23 grant funding
NOLB ERIs. 
2021/22 General
Revenue Grant (GRG)
funding pre-
employment support.
This ERI funding has attracted 2
employers who have recruited one
employee each. A further 2 places
will commence by 30th September
2022 and 6 places remain. 
32 of the 46 places available have
commenced support. Partners have
encountered a lack of referrals in this
age group. 
Page 194

Page 195

Table 2: Summary of Current Provision through Argyll & Bute Employability Partnership (continued)
Intervention Description  Delivery Partner Source of Investment
and volume
Outcomes to date
NOLB: Pre-employment
support
The Scottish Government
through Scotland Excel is
currently undertaking the first
stage of a procurement exercise
in relation to the selection of
providers for all 32 local
authorities, who will then run a
local procurement/offer of grant
exercise to deliver future service
provision.
The Scottish Government
has indicated there is a delay
in the process which will not
allow us to proceed to the
next stage to enable delivery
until the early autumn 2022. 
A further grant
allocation of
£228,017.65 in respect
of 22/23 has now been
received. 
Delays experienced by Scotland
Excel are now impacting on support
available to participants. Potential
alternative methods to procure
services are currently been
explored to ensure support is
available as soon as possible.
Parental Employability
Support Fund (PESF), 16 to
67 year olds
(see: Parental Employability
Support Fund (PESF) (argyll-
bute.gov.uk))
Designed to support low income
families to increase their income
through work, both through
supporting parents to access
paid employment and in helping
those in lower paid jobs to
progress to higher income. 
Argyll and Bute Council’s
Employability Team 
Our two part time PESF
Engagement Workers deliver
intensive in and out of work
employability support,
including person centered
support to upskill, apply for
jobs, gain progression whilst
employment, money advice,
health support, motivational
support, etc.
A further grant
£149,219.53 in respect
of 2022/23 has also
been received.
Support will partially
be delivered in house
by the Employability
Team and the
remainder will be
subject to a local
procurement process 
A total of 57 parents have now
joined the service 
Delays experienced by Scotland
Excel are now impacting on support
available to participants. Potential
alternative methods to procure
services are currently been
explored to ensure support is
available as soon as possible.
Parental Employability
Support Fund (PESF) -
Employer Recruitment
Incentives (ERIs) 25+ Years
(see: https://www.argyll-
bute.gov.uk/sites/default/files
/1._employer_information_le
aflet_nolb_-_eri.pdf)
Applications are now invited in
respect of the ERIs of up to
£6,000 per person. 
This allows unemployed people
aged 25+ years the opportunity
to move into permanent or a
fixed term employment contracts
of up to 18 months or more.
Argyll and Bute Council’s
Employability Team 
Given the late receipt
of 2021/22 grant offer
letters the Scottish
Government have
approved £147,000 to
be carried over to
2022/23.
To date no one has accessed this
funding, so all 10 places remain
available, our PESF Engagement
Workers continue to promote this
funding to parents they support
along with regular social media
posts. 
Page 195

Page 196

Table 2: Summary of Current Provision through Argyll & Bute Employability Partnership (continued)
Intervention Description  Delivery Partner Source of Investment
and volume
Outcomes to date
Kickstart Scheme: 16 to 24
year olds - DWP
Fully funded 26 week work
placements.
Argyll and Bute Council’s
Employability Team acting as
a Gateway Provider
£237,925.23 (£52,200
start payments and
£185,725.23 wages
payments)
32 employers applied for 66 work
placements. Due to employers not
proceeding/DWP failure to fill
advertised work placements these
placements reduced to 38.  Only 1
young person is currently on a work
placement as the majority have
now completed. This young person
is placed with Amenity Services.
The Young Person’s
Guarantee  - 16-24 year olds
(see: Young Person's
Guarantee (YPG) -
Information for Employers
(argyll-bute.gov.uk) and
Helping people into work
(argyll-bute.gov.uk)) 
Created to help young people
combat the effect of COVID, all
young people not in education,
training or employment can
access support. 
A total of 90 Employer
Recruitment Incentive (ERI) are
available. ERIs allow
unemployed young people the
opportunity to move into
permanent or a fixed term
employment contracts of up
to 18 months or more. 
Pre-employment support
including volunteering
opportunities was available to
young people to commence
support up to August 2022.
Argyll and Bute Council’s
Employability Team 
Three of our Local
Employability Partners
Given the late receipt
of 2021/22 grant offer
letters the Scottish
Government have
approved £684,906 be
carried over to
2022/23. 
A further grant
allocation of
£237,851.01 in respect
of 2022/23 has also
been received, which
will be subject to a
local procurement
process. 
56 ERIs have commenced, a
further 34 will be available until 31st
March 2023. 
Phase 1 pre-employment support
successfully supported 74 young
people. Of those 74 young people,
28 are in employment, 8 are carrying
out volunteering opportunities with
TSI, 2 have returned to school and 1
has entered further education. 
Phase 2 pre-employment support is
currently supporting 52 young
people. 
Delays experienced by Scotland
Excel are now impacting on support
available to participants. Potential
alternative methods to procure
services are currently been
explored to ensure support is
available as soon as possible.
NOLB Long Term
Unemployed (LTU)
Created to combat the effect of
COVID for those aged 25 plus
years and experiencing long
term unemployment. 28 fully
funded work placements
available.
One of our Local
Employability Partners 
A further grant
allocation of £280,000
in respect of 2022/23
has been received. 
To date 10 work placements have
commenced, a further 18 are
predicted to commence by 30th
September 2022. 
Page 196

Page 197

Policy and Resources Committee Work Plan 2022-23
This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. 
Date Report Title Dept/Section How Often? Date Due Comments 
13 October 2022  Financial Report Monitoring Pack  Financial Services Every meeting
except May
13 September 2022 
Budget Outlook 23-24 to 27-28 Financial Services 
Approach to Budget 2023-24  Financial Services   Working Group Update 
Policy For Empty Property Relief In
Non-Domestic Rates From 1 April
2023 
Financial Services 
Conservation Area Regeneration
Scheme (Cars) Project – 104-110
Argyll Street, Dunoon 
Development and
Economic Growth   
Place Based Investment and Crown
Estate Fund 2022/23
Development and
Economic Growth   
Community Empowerment
(Scotland) Act 2015 - Update -
Expressions Of Interest / Asset
Transfer Requests / Reporting
Requirements 
Commercial
Services  
Noting paper referred from
11.08.2022.  Agreed to consider
as substantive item at next
meeting. 
Tarbert and Lochgilphead
Regeneration Fund – Project Update
Development and
Economic Growth  
Recommendation from MAKI
Area Committee of 7 September
2022 
Argyll and Bute Employability
Financial and Service Provision
Update
Development and
Economic Growth   
Page 197
Agenda Item
13

Page 198

Policy and Resources Committee Work Plan 2022-23
Date Report Title Dept/Section How Often? Date Due Comments 
8 December
2022
Financial Report Monitoring Pack  Financial Services Every meeting
except May
8 November 2022 
Budget Outlook 23-24 to 27-28 Financial Services   
Procurement Strategy and
Sustainable Procurement Policy
Legal & Regulatory
Support   
Climate Change Board Update
Papers
Council Carbon Emissions & Climate
Investment 2022
Decarbonisation Plan Tracker &
Case Studies
Commercial
Services   
Date Report Title Dept/Section How Often? Date Due Comments 
16 February
2023
Budget 2023-2024 Financial Services  17 January 2023 
Treasury Management Strategy Financial Services 
Date Report Title Dept/Section How Often? Date Due Comments 
11 May 2023  TBC   11 April 2023 
Future Items – Date to be determined. 
Key Performance Indicators FQ2 –
2022/2023 – changing to Corporate
Outcome Indicators 
Customer Support
Services
Annual  
Page 198

Page 199

Policy and Resources Committee Work Plan 2022-23 
Historic Environment Scotland
Heritage and Place Programme –
Opportunity for Place Based
Heritage Funding
Development and
Economic Growth   
UK Shared Prosperity Fund – Argyll
and Bute Investment Plan
Development and
Economic Growth  
Regular updates to be provided. 
Agreed 11.08.2022
Page 199