ARGYLL AND BUTE COUNCIL  POLICY & RESOURCES COMMITTEE 
DEVELOPMENT AND 
ECONOMIC GROWTH  
13th OCTOBER 2022 
ARGYLL AND BUTE COUNCIL EMPLOYABILIITY FINANCIAL AND SERVICE
PROVISION UPDATE   
1.0 HEADLINES 
1.1 The purpose of this paper is to provide members of the Policy and Resources
Committee with an update on the current financial position of Argyll and Bute
Council’s Employability Team aligned to current and proposed service provision
across the region. 
1.2 A summary of the latest financial performance for the first quarter and forecast spend
for the rest of 2022/23 is outlined in Appendix 1, Table 1. It should be noted that the
forecast figures does not include the proposed allocation for 2022/23 for employability
interventions that have been submitted to the UK Government within the Argyll and
Bute UK Shared Prosperity Fund (UKSPF) Investment Plan. 
1.3 At present the Council’s Employability Team, along with partners in the Argyll and
Bute Employability Partnership (ABEP), delivers a plethora of interventions funded by
the Scottish Government under the No One Left behind (NOLB) policy direction. In
addition the Employability Team delivers Fair Start Scotland on behalf of PeoplePlus.
In short, Argyll and Bute Council’s Employability Service, which sits under Economic
Growth, unlike other local authority Employability Services, has never been core
funded and successfully delivers and manages partner employability activity through
receipt of external revenue funding. These interventions are as follows: 
 Fair Start Scotland, 16 to 67 year olds (managed by PeoplePlus on behalf the
Scottish Government); 
 Argyll and Bute Employer Recruitment and Training Incentive (ABERTI),16 to 67
year olds;
 No One Left Behind: Employer Recruitment Incentives (ERIs) 25+ years;
 No One Left Behind: Pre-employment support for 25+ year olds (partner delivery);
 Parental Employability Support Fund (PESF), 16 to 67 year olds;
 Parental Employability Support Fund (PESF) for Employer Recruitment Incentives
(ERIs) 25+ years; 
 The Young Person’s Guarantee, 16-24 year olds (ERIs)
 The Young Person’s Guarantee (ERIs), 16-24 year olds (partner delivery) and
 NOLB Long Term Unemployed (LTU) 25+ years (partner delivery). 
1.4 The team is also concluding the delivery of the UK Government’s Kickstart Scheme
for 16 to 24 year olds. The Scottish Government has also indicated that additional
Child Poverty monies may be allocated to local authorities in the autumn of this year.
However, the exact detail of this funding allocation has yet to be confirmed.

Page 2

2.0 RECOMMENDATIONS 
The Policy and Resources Committee are asked to note the content of this report. 
3.0 DETAIL 
Background of Argyll and Bute Council’s Employability Team 
3.1 At present the Council’s Employability Team, along with partners in the Argyll and
Bute Employability Partnership (ABEP), delivers a plethora of interventions funded by
the Scottish Government under the No One Left behind (NOLB) policy direction. In
addition the Employability Team delivers Fair Start Scotland on behalf of PeoplePlus.
In short, Argyll and Bute Council’s Employability Service, which sits under Economic
Growth, unlike other local authority Employability Services, has never been core
funded since its inception in 1999, and successfully delivers and manages partner
employability activity through receipt of external revenue funding. 
3.2 Along with input from the Economic Growth Manager the Employability Team comprises
of 5.7 FTEs (7 employees) which is a considerable cut from a team that comprised of
circa 26 externally funded employees when delivering previous policy packages such as
New Deal. 
Financial Performance 
3.3 A summary of the latest financial performance for the first quarter and forecast spend
for the rest of 2022/23 is outlined in Appendix 1, Table 1. As shown in Table 1,
employability provision, including that delivered by the Argyll and Bute Employability
Team, has had adequate income over the first quarter of 2022/23 and forecast to do
so for the rest of this financial year to cover known expenditure. 
3.4 It should be noted that the Argyll and Bute Employability Team will be in receipt of
other revenue funding in 2022/23 (an allocation of £78,997) for interventions that
have been submitted to the UK Government within the Argyll and Bute UK Shared
Prosperity Fund (UKSPF) Investment Plan subject to approval by the UK
Government, early autumn 2022. Furthermore, subject to approval, the Employability
Team will also receive a further allocation of £444,711 to deliver employability
interventions, as outlined in the Argyll and Bute UKSPF Investment Plan, until the
end of March 2025. 
3.5 For 2023/24 there will also be projected contingent liability spend of circa £214,000
for the Argyll and Bute Employability Team with respect to Employer Recruitment
Incentive (ERI) payments to employers, where this money has been allocated by the
Scottish Government in 2022/23 (as per Appendix 1, Table 1). This is due to the
duration of the 12 month ERI intervention, so activity will be required into 2023/24
from 2022/23. There will also be a further single grant offer allocation from the
Scottish Government, under NOLB for 2023/24, which is not yet known. There are
ongoing discussions with the Scottish Government on the potential to introduce multi-
annual funding for employability activity, but nothing has been decided to date.

Page 3

3.6 The Scottish Government has also indicated that additional Child Poverty monies
may be allocated to local authorities in the autumn of this year. However, the exact
detail of this funding allocation has yet to be confirmed. 
Employability Delivery through Argyll & Bute Employability Partnership 
3.7 At present the Employability Team, along with partners in the Argyll and Bute
Employability Partnership (ABEP), delivers a plethora of interventions funded by the
Scottish Government under the No One Left behind (NOLB) policy direction. A
summary of current activity by the Employability Team and partners is provided below
in Appendix 2, Table 2; more detail can be found in Table 3b within the ABEP
Delivery Plan, 2022-25. 
3.8 The ABEP Delivery Plan, 2022-25 is a working document that provides a platform for
partners and stakeholders delivering employability services across Argyll and Bute to
work together to identify opportunities, align priorities, learn from each other, develop
valued services and ultimately add value to every engagement with supported
individuals. 
3.9 Argyll and Bute Council is the accountable body for the ABEP. All intervention
outcomes and associated spend is monitored and reported to the Scottish
Government by the Employability Team. 
Performance Challenges 
3.10 The Employability Team, as a key member of the ABEP, recognises that stronger and
more collaborative partnership working, focused on a place-based person-centred
approach, is helping to ensure suitable opportunities for individuals of all ages and
capabilities through tackling socio-economic disadvantage, inequalities and removing
multiple barriers to securing sustainable employment. However, there are still
performance challenges as follows: 
 Failure to recruit additional suitable staff has had a major impact on the
Employability Team’s ability to deliver the desired level of support whilst
maximising the funding allocation from the Scottish Government. 
 Late issue of grant offer letters (during year of service delivery) and hard stop
spends imposed by the Scottish Government has resulted in underspends due to
extremely tight timescales. 
 The delay of Scotland Excel’s procurement process to allow services to be
commissioned for 2023/23. Discussions are taking place with the Council’s
Procurement Team to focus on compliant and continuity of current service delivery
to ensure no one is left behind due to delayed processes. 
 COVID-19 had reduced the number of expected participants and employers
accessing support. However, this situation is beginning to ease with the uptake
starting to increase.

Page 4

4.0 CONCLUSION 
4.1 This paper provides members of the Policy and Resources Committee with an update
on the current financial position of Argyll and Bute Council’s Employability Team and
delivery partners aligned to current and proposed service provision across the region. 
4.2 By working together with external contractors and partners, the Employability Team
strives to offer a robust and financially sustainable approach to the delivery of the
employability provision across Argyll and Bute. Combining staff’s skills, strengths and
experience will allow for maximum benefit to be delivered to vulnerable individuals
across the whole of Argyll and Bute’s urban, rural, remote rural and island
communities. 
4.3 In such a challenging environment, the Employability Team is constantly aware that
contractual performance in terms of starts and job outcomes needs to be sustained
on a month-by-month basis going forward to enable income streams to continue to
cover service costs. Current funding from the Scottish Government and the proposals
in the UKSPF Investment Plan takes account of the capacity / management fee
funding to support delivery. This approach is really welcomed, particularly as the
Employability Team is fully funded externally. 
5.0 IMPLICATIONS 
5.1  Policy - the current employability service provision fits and contributes to Outcome 3:
Education, skills and training maximises opportunities for all and Outcome 5: People
live active, healthier and independent lives in the Local Outcome Improvement Plan
(LOIP). The service also fits and contributes to the Argyll and Bute Council priority:
‘Argyll & Bute Council will be a mental health champion, promoting good health and
helping people back into employment when necessary’ and the inclusive ‘skills for
work’ focus outlined in the Council’s Economic Strategy. 
5.2 Financial - the Council’s Employability Team is funded on a commercial basis through
the delivery of challenging service delivery contracts. The team also provides an
accountable body function for the ABEP in terms of monitoring financial spend and
outcomes. 
5.3 Legal - all appropriate legal implications will be taken into consideration. 
5.4 HR - difficulty in recruiting for posts where funding was sourced externally. 
5.5 Fairer Scotland Duty - the Fairer Scotland Duty, Part 1 of the Equality Act 2010, came
into force in April 2018. The duty places a legal responsibility on particular public
bodies in Scotland, such as Argyll and Bute Council, to pay due regard to (actively
consider) how they can reduce inequalities of outcome, caused by socio-economic
disadvantage, when making strategic decisions and how this has been implemented.
This is a core function of the Council’s Employability Team. 
5.5.1 Equalities - all activities will comply with all Equal Opportunities/Fairer Scotland Duty
policies and obligations. 
5.5.2 Socio-economic Duty - all project activities will comply with the council’s socio-

Page 5

economic duty. 
5.5.3  Islands - employability services are delivered across the whole of Argyll and Bute
including the island communities. 
5.6  Climate Change – the current telephone and online delivery has decreased travel
and the Employability Team’s carbon footprint. 
5.7  Risk – cost of living crisis may result in more vulnerable people needing support
across Argyll and Bute within finite resource constraints. 
5.8  Customer Service – None.   
Kirsty Flanagan, Executive Director responsible for Economic Growth 
Councillor Robin Currie: Policy Lead for Economy and Rural Growth
13th October 2022 
For further information contact: 
Ishabel Bremner, Economic Growth Manager 
ishabel.bremner@argyll-bute.gov.uk

Page 6

Appendix A: Latest Financial Position - Employability Provision under NOLB 
Table 1: Latest Financial Positon for Argyll & Bute Employability Team and Partner Employability Provision (£)
Income Position at 31st
March 2022 Apr-June 22/23 Projected
July-Mar 22/23 Totals
Balance brought forward from 2021/22 415,492.94    415,492.94
Employability Income    
Fair Start Scotland Service Fee @ 7,330 per month (June 22
to March 23 outstanding - current funding contract will cease
31/03/2023) 
25,659.83  73,300.00  98,959.83 
Fair Start Scotland Projected Job Outcomes June 22 to
March 23 outstanding (based on current participants in work)  8,248.57  53,664.04  61,912.61 
Management/Admin Recharge Employability Team  37,288.61  104,099.69  141,388.30 
Scottish Government - 2021/22 General Revenue Grant
(GRG) - NOLB, PESF, YPG, LTU (not yet credited to
Employability ledger) 
238,404.50 715,213.50  953,618.00 
Scottish Government - Single Grant Offer General Revenue
Grant - NOLB  228,017.65  228,017.65 
Scottish Government - Single Grant Offer General Revenue
Grant - PESF  149,219.53  149,219.53 
Scottish Government - Single Grant Offer General Revenue
Grant - YPG  237,851.01  237,851.01 
Scottish Government - Single Grant Offer General Revenue
Grant – LTU  280,000.00  280,000.00 
Kickstart Scheme  20,005.08  7,350.89  27,355.97 
Total Income 415,492.94  329,606.59  1,848,716.31  2,593,815.84

Page 7

Table 1: Latest Financial Positon for Argyll & Bute Employability Team and Partner Employability Provision (£) (continued)
Expenditure Position at 31st
March 2022 Apr-June 22/23 Projected July-Mar
22/23 Totals
Employability Expenditure    
Staffing Costs Employability Team (to include latest pay
offer)  41,311.78  166,035.93 207,347.71 
Running costs Employability Team (e.g. staff travel,
premises, etc. but excluding salaries)  1,905.77  7,600.00  9,505.77 
Payments to ABERTI Employers  8,500.00 17,500.00 26,000.00
Payments to NOLB 25+ ERI Employers  1,500.00  25,500.00  27,000.00 
Payments to PESF ERI Employers  55.00  14,945.00  15,000.00 
Payments to CLD/LEP Partners for delivery of NOLB/YPG  107,028.98  204,133.76  311,162.74 
Proposed PESF Work Placements - GRG monies   80,000.00  8,000.00 
Proposed commissioning/grant offer to deliver NOLB - 22/23
monies   177,251.29  177,251.29 
Proposed commissioning/grant offer to deliver PESF - 22/23
monies   76,566.26 76,566.26 
Proposed commissioning/grant offer to deliver YPG - 22/23
monies   214,065.91  214,065.91 
Payments to CLD/LEP Partners for delivery of LTU - 22/23
monies   280,000.00  280,000.00 
Payments to CLD/LEP Partners for management and admin
of LTU - 22/23 monies   28,000.00  28,000.00 
Management/Admin Recharge  37,288.61  104,099.69  141,388.30 
Payments to YPG Employers  46,268.80  66,500.00  112,768.80 
Payments to ABC YPG Apprentices  25,060.72  4,195.93  29,256.65 
Payments to Kickstart Employers  17,668.33  7,350.89  25,019.22 
Participant Costs - Travel/Training/PPE  2,908.91  44,000.00  46,908.91 
Scottish Government - 2019/20 and 2020/21 NOLB/PESF
recovery (underspend due to late receipt of grant offer letters,
COVID and failure to recruit suitable additional staff) 
237,960.85  237,960.85 
Total Expenditure  289,496.90  1,755,705.51  2,045,202.41 
Overall Balance  415,492.94 40,109.69  93,010.80  548,613.43

Page 8

Appendix 2: Summary of Provision through the Argyll & Bute Employability Partnership 
Table 2: Summary of Current Provision through Argyll & Bute Employability Partnership 
Intervention Description  Delivery Partner Source of Investment
and volume
Outcomes to date
Fair Start Scotland, 16 to 67
year olds
(see: Fair Start (argyll-
bute.gov.uk) 
Fair Start Scotland helps people
who want to work but find it
difficult based on their
circumstances, 
People Plus and Argyll and
Bute Council’s Employability
Team
Scottish Government 302 participants, aligned to
JobCentrePlus locations:
 67 Helensburgh
 72 Campbeltown
 34 Rothesay
 49 Dunoon
 80 Oban
Across the Highlands and Islands
area starts continue to be low
Through the preparation of a
Marketing Action Plan the team
continues to encourage people to
sign up, with a reduced
unemployment rates and increasing
cost of living this is proving to be a
challenge.
Argyll and Bute Employer
Recruitment and Training
Incentive (ABERTI), 16 to 67
year olds
Applications for this fund ceased
at 31/03/22, but activity still
being delivered.
Argyll and Bute Council’s
Employability Team
Approval to accrue all
21/22 underspent
monies to 22/23 has
been granted by the
Cabinet Secretary and
the  Memorandum of
Understanding
received
A total of 37 participants and 28
employers were supported. To date
29 participants have completed the
52 week funded period or left early,
22 (76%) are in employment; 15
(68%) of which retained by the
employer accessing the funding
and 7 (32%) have moved to
another employer.
No One Left Behind (NOLB) -
Employer Recruitment
Incentives (ERIs) 25+ Years
(see: https://www.argyll-
bute.gov.uk/helping-people-
work and https://www.argyll-
bute.gov.uk/sites/default/files
/1._employer_information_le
aflet_nolb_-_eri.pdf)
Applications are now invited in
respect of the ERIs of up to
£6,000 per person. 
This allows unemployed people
aged 25+ years the opportunity
to move into permanent or a
fixed term employment contracts
of up to 18 months or more. 
Three of our Local
Employability Partners now
support 46 NOLB pre-
employment participants aged
25+. 
2022/23 grant funding
NOLB ERIs. 
2021/22 General
Revenue Grant (GRG)
funding pre-
employment support.
This ERI funding has attracted 2
employers who have recruited one
employee each. A further 2 places
will commence by 30th September
2022 and 6 places remain. 
32 of the 46 places available have
commenced support. Partners have
encountered a lack of referrals in this
age group.

Page 9

Table 2: Summary of Current Provision through Argyll & Bute Employability Partnership (continued)
Intervention Description  Delivery Partner Source of Investment
and volume
Outcomes to date
NOLB: Pre-employment
support
The Scottish Government
through Scotland Excel is
currently undertaking the first
stage of a procurement exercise
in relation to the selection of
providers for all 32 local
authorities, who will then run a
local procurement/offer of grant
exercise to deliver future service
provision.
The Scottish Government
has indicated there is a delay
in the process which will not
allow us to proceed to the
next stage to enable delivery
until the early autumn 2022. 
A further grant
allocation of
£228,017.65 in respect
of 22/23 has now been
received. 
Delays experienced by Scotland
Excel are now impacting on support
available to participants. Potential
alternative methods to procure
services are currently been
explored to ensure support is
available as soon as possible.
Parental Employability
Support Fund (PESF), 16 to
67 year olds
(see: Parental Employability
Support Fund (PESF) (argyll-
bute.gov.uk))
Designed to support low income
families to increase their income
through work, both through
supporting parents to access
paid employment and in helping
those in lower paid jobs to
progress to higher income. 
Argyll and Bute Council’s
Employability Team 
Our two part time PESF
Engagement Workers deliver
intensive in and out of work
employability support,
including person centered
support to upskill, apply for
jobs, gain progression whilst
employment, money advice,
health support, motivational
support, etc.
A further grant
£149,219.53 in respect
of 2022/23 has also
been received.
Support will partially
be delivered in house
by the Employability
Team and the
remainder will be
subject to a local
procurement process 
A total of 57 parents have now
joined the service 
Delays experienced by Scotland
Excel are now impacting on support
available to participants. Potential
alternative methods to procure
services are currently been
explored to ensure support is
available as soon as possible.
Parental Employability
Support Fund (PESF) -
Employer Recruitment
Incentives (ERIs) 25+ Years
(see: https://www.argyll-
bute.gov.uk/sites/default/files
/1._employer_information_le
aflet_nolb_-_eri.pdf)
Applications are now invited in
respect of the ERIs of up to
£6,000 per person. 
This allows unemployed people
aged 25+ years the opportunity
to move into permanent or a
fixed term employment contracts
of up to 18 months or more.
Argyll and Bute Council’s
Employability Team 
Given the late receipt
of 2021/22 grant offer
letters the Scottish
Government have
approved £147,000 to
be carried over to
2022/23.
To date no one has accessed this
funding, so all 10 places remain
available, our PESF Engagement
Workers continue to promote this
funding to parents they support
along with regular social media
posts.

Page 10

Table 2: Summary of Current Provision through Argyll & Bute Employability Partnership (continued)
Intervention Description  Delivery Partner Source of Investment
and volume
Outcomes to date
Kickstart Scheme: 16 to 24
year olds - DWP
Fully funded 26 week work
placements.
Argyll and Bute Council’s
Employability Team acting as
a Gateway Provider
£237,925.23 (£52,200
start payments and
£185,725.23 wages
payments)
32 employers applied for 66 work
placements. Due to employers not
proceeding/DWP failure to fill
advertised work placements these
placements reduced to 38.  Only 1
young person is currently on a work
placement as the majority have
now completed. This young person
is placed with Amenity Services.
The Young Person’s
Guarantee  - 16-24 year olds
(see: Young Person's
Guarantee (YPG) -
Information for Employers
(argyll-bute.gov.uk) and
Helping people into work
(argyll-bute.gov.uk)) 
Created to help young people
combat the effect of COVID, all
young people not in education,
training or employment can
access support. 
A total of 90 Employer
Recruitment Incentive (ERI) are
available. ERIs allow
unemployed young people the
opportunity to move into
permanent or a fixed term
employment contracts of up
to 18 months or more. 
Pre-employment support
including volunteering
opportunities was available to
young people to commence
support up to August 2022.
Argyll and Bute Council’s
Employability Team 
Three of our Local
Employability Partners
Given the late receipt
of 2021/22 grant offer
letters the Scottish
Government have
approved £684,906 be
carried over to
2022/23. 
A further grant
allocation of
£237,851.01 in respect
of 2022/23 has also
been received, which
will be subject to a
local procurement
process. 
56 ERIs have commenced, a
further 34 will be available until 31st
March 2023. 
Phase 1 pre-employment support
successfully supported 74 young
people. Of those 74 young people,
28 are in employment, 8 are carrying
out volunteering opportunities with
TSI, 2 have returned to school and 1
has entered further education. 
Phase 2 pre-employment support is
currently supporting 52 young
people. 
Delays experienced by Scotland
Excel are now impacting on support
available to participants. Potential
alternative methods to procure
services are currently been
explored to ensure support is
available as soon as possible.
NOLB Long Term
Unemployed (LTU)
Created to combat the effect of
COVID for those aged 25 plus
years and experiencing long
term unemployment. 28 fully
funded work placements
available.
One of our Local
Employability Partners 
A further grant
allocation of £280,000
in respect of 2022/23
has been received. 
To date 10 work placements have
commenced, a further 18 are
predicted to commence by 30th
September 2022.