Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
3 August 2023 
NOTICE OF MEETING 
A meeting of the POLICY AND RESOURCES COMMITTEE will be held ON A HYBRID BASIS IN
THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS on
THURSDAY, 10 AUGUST 2023 at 10:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
3. MINUTES (Pages 5 - 10)  
Policy and Resources Committee held on 11 May 2023
* 4. FINANCIAL REPORTS MONITORING PACK - 30 JUNE 2023 (Pages 11 - 124)  
Report by Section 95 Officer 
5. BUDGET OUTLOOK 2024-25 TO 2028-29 (Pages 125 - 142)  
Report by Section 95 Officer
* 6. CAPITAL INVESTMENT STRATEGY 2023 - 2038 (Pages 143 - 168)  
Report by Executive Director with responsibility for Commercial Services 
7. COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 - UPDATE -
EXPRESSIONS OF INTEREST / ASSET TRANSFER REQUESTS / REPORTING
REQUIREMENTS (Pages 169 - 176)  
Report by Executive Director with responsibility for Commercial Services 
8. UK LEVELING UP FUND – GOVERNMENT FEEDBACK (Pages 177 - 196)  
Report by Executive Director with responsibility for Roads and Infrastructure and
Development and Economic Growth 
Public Document Pack

Page 2

9. PLACE BASED INVESTMENT 2023/24 - PBI PROJECTS AND ALLOCATION
(Pages 197 - 204)  
Report by Executive Director with responsibility for Development and Economic
Growth 
10. ISLANDS COST CRISIS EMERGENCY FUND 2023/24 (Pages 205 - 208)  
Report by Executive Director with responsibility for Development and Economic
Growth 
REPORTS FOR NOTING 
11. CHANGE TO ARGYLL COMMUNITY HOUSING ASSOCIATION GOVERNANCE
STRUCTURE (Pages 209 - 230)  
Report by Executive Director with responsibility for Development and Economic
Growth 
12. POLICY AND RESOURCES COMMITTEE WORKPLAN (Pages 231 - 234) 
13. ROTHESAY PAVILION 
REPORT FOR CONSIDERATION  
(a) RURAL GROWTH DEAL – ROTHESAY PAVILION (Pages 235 - 242)   
Report by Executive Director with responsibility for Development and
Economic Growth 
EXEMPT REPORT FOR CONSIDERATION
E1  (b) ROTHESAY PAVILION - PROJECT POSITION UPDATE (Pages 243 -
252)   
Report by Executive Director with responsibility for Commercial Services
and Executive Director with responsibility for Development and Economic
Growth 
Items marked with an “asterisk” are items, on the basis of information available at the time this
Agenda is published, on which the Committee may not have delegated powers to act, and which
may therefore require to be referred to the Council or another Committee, and that referral may
depend on the decision reached at the meeting. 
The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraphs are:- 
E1 Paragraph 8  The amount of any expenditure proposed to be incurred by the authority
under any particular contract for the acquisition of property or the supply of goods or
services.
Paragraph 9  Any terms proposed or to be proposed by or to the authority in the course of
negotiations for a contract for the acquisition or disposal of property or the supply of goods
or services.

Page 3

Policy and Resources Committee 
Councillor Gordon Blair Councillor Robin Currie (Chair)
Councillor Audrey Forrest Councillor Kieron Green
Councillor Amanda Hampsey Councillor Fiona Howard
Councillor Willie Hume Councillor Andrew Kain
Councillor Reeni Kennedy-Boyle Councillor Jim Lynch
Councillor Liz McCabe Councillor Yvonne McNeilly
Councillor Ross Moreland Councillor Gary Mulvaney (Vice-Chair)
Councillor Dougie Philand Councillor Alastair Redman   
Contact: Hazel MacInnes  Tel: 01546 604269

Page 4

This page is intentionally left blank

Page 5

MINUTES of MEETING of POLICY AND RESOURCES COMMITTEE held BY MICROSOFT TEAMS 
on THURSDAY, 11 MAY 2023 
Present: Councillor Robin Currie (Chair) 
Councillor Gordon Blair
Councillor Audrey Forrest
Councillor Kieron Green
Councillor Amanda Hampsey
Councillor Fiona Howard
Councillor Willie Hume
Councillor Andrew Kain
Councillor Reeni Kennedy-Boyle 
Councillor Jim Lynch
Councillor Liz McCabe
Councillor Yvonne McNeilly
Councillor Ross Moreland
Councillor Gary Mulvaney
Councillor Douglas Philand
Councillor Alastair Redman 
Also Present: Councillor Jan Brown Councillor Peter Wallace 
Attending: Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director / Section 95 Officer
Anne Blue, Head of Financial Services
Jane Fowler, Head of Customer Support Services
Ross McLaughlin, Head of Commercial Services
Fergus Murray, Head of Development and Economic Growth
Shona Barton, Governance Manager 
1. APOLOGIES FOR ABSENCE 
There were no apologies for absence intimated. 
2. DECLARATIONS OF INTEREST 
Councillor Fiona Howard declared a non-financial interest in item 8 of the agenda
(Strategic Events and Festivals Fund – Round 5.2 2023/2024) due to her appointment as
a trustee to the Helensburgh Winter Festival.  She advised that she would leave the
meeting during the consideration of this item of Business. 
Councillor Dougie Philand noted a connection in relation to item 11 of the agenda
(Kilmartin Museum – Request for Funding) due to him being one of the local members for
that Ward and advised that he would leave the meeting during the consideration of this
item of business. 
3. MINUTES 
The Minutes of the meeting of the Policy and Resources Committee held on 16 February
2023 were approved as a correct record. 
4. BUDGET OUTLOOK 2024-25 TO 2028-29 
The Committee gave consideration to a report summarising the budget outlook covering
the period 2024-25 to 2028-29, taking into consideration the decisions made at the
Council Budget Meeting on 23 February 2023. This was the first outlook of the financial
Page 5 Agenda Item 3

Page 6

year which rolled forward previous estimates as well as updating some estimates, and
also extending the budget outlook to 2028-29.  The assumptions would continue to be
updated as the year progressed. 
Decision 
The Policy and Resources Committee noted the current estimated budget outlook position
for the period 2024-25 to 2028-29. 
(Reference:  Report by Section 95 Officer dated 21 April 2023, submitted) 
5. BUDGET APPROACH 
The Committee gave consideration to a report providing an update on the budget
approach for 2024-25 and providing a high level draft budget timetable. 
Decision 
The Policy and Resources Committee agreed – 
1. the 2024-25 budget approach as set out in the submitted report; and 
2. the creation of a Budget Working Group as set out in paragraph 4.2 of the submitted
report. 
(Reference:  Report by Section 95 Officer dated 21 April 2023, submitted) 
6. PUBLIC SECTOR REFORM UPDATE 
The Committee gave consideration to a report providing an overview of the emerging
public sector reform and associated legislation that was likely to result in fundamental
changes to how public services were delivered and, equally important, how decisions
around public services were made. 
Decision 
The Policy and Resources Committee agreed that – 
1. there be further exploration of the option for a Single Authority Model for Argyll and
Bute; and 
2. exploratory discussions with the Scottish Government be commenced and that the
Chief Executive seek inclusion in the Single Island Authority meetings already in train. 
(Reference:  Report by Chief Executive dated 6 April 2023, submitted) 
7. ARGYLL AND BUTE EQUALITY MAINSTREAMING REPORT 2023 AND EQUAL
PAY AUDIT 
As part of the equalities duties set out in the Public Sector Equality Duty (PSED), the
Council, Education Authority and Licensing Board are required to report on their equalities
mainstreaming activities every 2 years. The Committee gave consideration to the Equality
Mainstreaming Report for the period 2021-2023.
Page 6

Page 7

Decision 
The Policy and Resources Committee – 
1. approved the Equality Mainstreaming Report; and 
2. noted the findings of the Equal Pay Audit, which had been carried out as part of duties
under equality legislation. 
(Reference:  Report by Executive Director with responsibility for Customer Support
Services dated 6 April 2023, submitted) 
Councillor Fiona Howard, having declared an interest in the following item of business, left
the meeting and took no part in the consideration of this item. 
8. STRATEGIC EVENTS AND FESTIVALS FUND - ROUND 5.2 2023/2024 
The Committee gave consideration to a report providing an update on the further call for
applications in respect of Round 5 – 2023/24 (referred to as Round 5.2) of the Council’s
Strategic Events and Festivals Fund (SEF). The report provided details of the applications
submitted and recommendations regarding all eligible applications put forward to receive
grant funding. 
Decision 
The Policy and Resources Committee – 
1. agreed to the award of eligible SEF Round 5.2 grants amounting to £48,371 as
detailed in Table 1 of the submitted report; 
2. agreed that any SEF grant offer only be formally issued upon confirmation from the
individual event organisation that the event is formally confirmed and is definitely going
ahead and still meets the SEF Round 5 criteria.  These grants were detailed in
Appendix 1, Table 1 of the submitted report; 
3. agreed to continue delegation of powers to the Executive Director with responsibility
for Development and Economic Growth to allow any subsequent amendment to
existing grant requests to be made brought about as a consequence of changes to the
event/event budget. Any amendment to a current grant request/offer would only be
considered if the amendment related to either the same level or a reduction in the
request from and constitute up to 75% of legitimate and eligible expenditure; and 
4. noted that £14,204 would be left to be earmarked towards a future SEF round as
previously agreed by Committee in February 2022. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 25 April 2023, submitted) 
Councillor Fiona Howard re-joined the meeting at this point. 
Page 7

Page 8

9. CLIMATE CHANGE BOARD 
(a) DEPOSIT RETURN SCHEME (DRS) IMPLICATIONS FOR ARGYLL AND BUTE
INCLUDING COUNCIL SERVICES AND STAKEHOLDERS 
The Committee gave consideration to a report raising awareness of, and outlining
the implications for Argyll and Bute as a result of the implementation of the Deposit
Return Scheme which had been due to come into effect on 16 August 2023, but had
been delayed for 7 months to March 2024. The deposit return scheme would require
everyone who purchased a glass or plastic bottle, or drinks can to pay a 20p deposit
which would be redeemable at a point of purchase when they returned their empty
bottle or can. 
Decision 
The Policy and Resources Committee – 
1. noted the content of the report and endorsed the work of officers across the
Council to implement the Deposit Return Scheme; 
2. agreed that officers should continue to highlight the concerns of businesses and
the potential negative impacts on matters such as Free School Meals to the
Scottish Government seeking greater clarity and response on operational
matters; 
3. agreed that the Policy Lead for Climate Change and Environment Services be
authorised to make representations to the Scottish Government on behalf of the
Council; and 
4. noted that the Scottish First Minister announced on 18th April 2023 that the
Deposit Return Scheme (DRS) would no longer launch this August, with a seven
month delay and new implementation date of March 2024 to allow de-risking and
operational issues to be addressed. 
(Reference:  Report by Executive Director with responsibility for Commercial
Services dated 4 April 2023, submitted) 
(b) COUNCIL CARBON EMISSIONS AND CARBON LITERATE ORGANISATION
(CLO) BRONZE AWARD 
The Committee gave consideration to a report highlighting the Council’s overall
emissions for the most recent period 2021/22 and confirming that the Council’s
emissions were 28% down since records began. The report also advised that the
Council had achieved the nationally recognised Bronze Carbon Literate
Organisation Award. 
Decision 
The Policy and Resources Committee – 
1. noted the publication of the Council’s 2021/22 carbon emissions report that
confirmed a small 6% increase in emissions reported for the year, but that
carbon dioxide emissions had still reduced by 28.4% in the past 7 years; and
Page 8

Page 9

2. commended and agreed to promote the Council achievement of the Bronze
Carbon Literate Organisation (CLO) accolade noting that further training will be
rolled out for staff, Councillors and Communities via ACT and Council. 
(Reference:  Report by Executive Director with responsibility for Commercial
Services dated 5 April 2023, submitted) 
(c) COUNCIL DECARBONISATION PLAN TRACKER 
The Committee gave consideration to a report providing the latest update to the
Council’s Decarbonisation Plan Tracker. 
Decision 
The Policy and Resources Committee noted the updated Decarbonisation Plan
Tracker. 
(Reference:  Report by Executive Director with responsibility for Commercial
Services dated 5 April 2023, submitted) 
(d) UPDATE ON LOCAL HEAT AND ENERGY EFFICIENCY STRATEGY (LHEES)
AND ENERGY EFFICIENT SCOTLAND: AREA BASED SCHEME (EES: ABS) 
The Committee gave consideration to a report providing an update to two important
projects being undertaken by the Climate Change Board to help to get domestic
properties to be more heat efficient and also setting out a wider heat and energy
efficiency strategy. 
Decision 
The Policy and Resources Committee – 
1. noted the emerging requirements to develop a Local Heat and Energy Efficiency
Strategy (LHEES); and 
2. commended and agreed to promote the successful installation of over £3.4m
worth of property upgrades in the region to make homes more heat efficient
through working in partnership with Scottish Government’s Energy Efficient
Scotland: Area Based Scheme (EES:ABS) and other partners. 
(Reference:  Report by Executive Director with responsibility for Commercial
Services dated 5 April 2023, submitted) 
(e) NON-DOMESTIC ENERGY EFFICIENCY FRAMEWORK (NDEEF) PROGRESS
UPDATE 
The Committee gave consideration to a report providing a brief summary of the
progress with Argyll and Bute Council’s Scottish Government Non-Domestic Energy
Efficiency Framework project (NDEEF1) which was delivering a range of energy
efficient projects at 12 Council properties.  The delivery of the project had been
instrumental in reducing energy costs and had made a significant contribution to the
Council meeting Climate Change Carbon Reduction Targets.
Page 9

Page 10

Decision 
The Policy and Resources Committee – 
1. noted the progress made to date on the NDEEF project completing 47no. out of
50no projects so far; and 
2. noted the climate change projects outlined at Section 4 of the submitted report
that would be developed in 2023 onwards and would form NDEEF Project 2 that
would commit a further £1.5m into projects relating to energy efficiency, reducing
reliance on fossil fuels and increasing efficiency. 
(Reference:  Report by Executive Director with responsibility for Commercial
Services dated 5 April 2023, submitted) 
10. POLICY AND RESOURCES COMMITTEE WORK PLAN 
The Policy and Resources Committee work plan was before the committee for noting. 
Decision 
The Policy and Resources Committee noted the content of the work plan. 
(Reference:  Policy and Resources Committee work plan as at May 2023, submitted) 
Councillor Dougie Philand, having noted a connection with the following item of business,
left the meeting and took no part in the consideration of this item. 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following item of business on the grounds
that it was likely to involve the disclosure of exempt information as defined in Paragraph 6
of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 
11. KILMARTIN MUSEUM - REQUEST FOR FUNDING 
The Committee gave consideration to a report that sought the approval of a request from
Kilmartin House Museum Limited for grant funding support from the Council. 
Decision 
The Policy and Resources Committee agreed the recommendations within the submitted
report. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 4 May 2023, submitted)
Page 10

Page 11

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 10 AUGUST 2023
FINANCIAL REPORTS MONITORING PACK – 30 JUNE 2023  
1. INTRODUCTION 
1.1 This report provides a summary of the financial monitoring reports as at the end of
June 2023. There are five detailed reports, setting out the position as at 30 June
2023,  which are summarised in this Executive Summary: 
• Revenue Budget Monitoring Report 
• Monitoring of Financial Risks 
• Capital Plan Monitoring Report 
• Treasury Monitoring Report 
• Reserves and Balances 
2. DETAIL 
2.1 Revenue Budget Monitoring Report 
2.1.1 This report provides a summary of the current revenue budget monitoring position to
ensure net expenditure is contained within budget.  It provides corporate and
departmental information with comparisons on a forecast outturn and a year to date
basis. 
2.1.2  There is a forecast underspend of £0.319m as at the end of June 2023.  This
forecast relates entirely to Social Work and is due to a combination of the over-
recovery of vacancy savings and income from fees, charges and recharges.  This is
offsetting financial pressures due to high demand for services and the use of agency
staff to fill staffing recruitment and retention gaps across Adult Services.  
2.1.3  There is a year to date overspend of £1.273m.  More focus is on the forecast outturn
position, hence why sometimes the year to date position is not updated.  The year to
date variances mainly relate to the timing of income and expenditure and recharging
of costs to capital. 
2.1.4 With regard to the ongoing financial impact of COVID-19, there are £5.512m of
reserves committed to manage the impact of the pandemic. The detail behind these
commitments is contained within Appendix 2 of the Reserves and Balances report. 
2.1.5 Total policy savings relevant to 2023-24 financial year amount to £6.953m.  The
table below outlines their progress as at 30 June 2023.   
Page 11 Agenda Item 4

Page 12

Category No. of
Options
2023-24
£000
2023-
24
FTE
2024-25
£000
2024-
25
FTE
Future
Years
£000
Future
Years
FTE
Delivered 9 1,012.5 (0.7) 1,030.0 (0.7) 1,030.0 (0.7)
On Track to be
Delivered 5 5,487.0 9.4 5,490.0 11.9 5,588.0 12.4
Still to be
Implemented 1 0.5 0.0 0.5 0.0 0.5 0.0
Being Developed 0 0.0 0.0 0.0 0.0 0.0 0.0
Will not be achieved 2 248.5 0.0 248.5 0.0 248.5 0.0
Potential Shortfall 2 180.0 0.0 180.0 0.0 180.0 0.0
Delayed 1 24.0 0.0 24.0 0.0 24.0 0.0
TOTAL 20 6,952.5 8.7 6,973.0 11.2 7,071.0 11.7 
2.1.6 There are two savings marked as not going to be achieved and a cost pressure will
be input for 2024-25 budget to remove these savings targets.  Two further savings
are categorised as having a shortfall and one is currently delayed.   
Health and Social Care Partnership (HSCP) – Financial Update 
2.1.7 The forecast outturn position at the end of June is an estimated overspend of
£0.631m for 2023-24 (underspend of £0.319m for Social Work and overspend of
£0.950m for Health). The HSCP may use the social work underspend to help
address the deficit in NHS or transfer all or part of the social work underspend to the
IJB reserves. The HSCP’s financial position will continue to be monitored and
Financial Services staff will engage with the HSCP Chief Financial Officer to ensure
that mitigation actions are in place to address the deficit and ensure that no
additional funding is required from the Council. 
2.2 Monitoring of Financial Risks 
2.2.1  This report outlines the process and approach developed in carrying out a financial
risks analysis and provides an update on the current assessment of financial risks.   
2.2.2 There are 6 Council wide revenue risks identified for 2023-24 currently amounting to
£3.661m.   
2.2.3 There are currently 39 departmental risks totalling £4.800m.  Of the 39 departmental
risks, 4 are categorised as likely.  These will continue to be monitored and action
taken to mitigate or manage these risks.   
2.2.4 The top three risks in terms of the financial impact are noted in the table below. 
Page 12

Page 13

SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance -
Bridges,
Culverts & Sea
Defences
Extreme localised weather
may result in loss of bridge,
culvert, road or sea defence.
3 750
Roads and
Infrastructure
Services
Winter
Maintenance
Adverse weather conditions
which require greater than
budgeted number of gritting
runs.
3 365
Financial
Services
Council Tax
Debt
Collection
Recovery
Recovery of debt becomes
more difficult to pursue in the
current economic
climate.  This is in relation to
historical debt that has
accumulated over many years
therefore any adverse
collection rates will impact on
the year end debt provision as
opposed to the in-year
financial position, hence no
forecast variance has been
reported within the current
year.
3 345 
2.2.5 There have been 5 changes to the departmental risks since the report as presented
to the Council on 23 February 2023.  These are outlined in paragraph 3.4.1 of the
Financial Risks Report. 
2.3 Capital Plan Monitoring Report 
2.3.1 
2.3.2
This report provides a summary of the current capital plan monitoring position. 
Information is provided in terms of monitoring year to date budget, current full year
budget, future years total budget and funding and non-financial in terms of project
performance. 
In recent years, the Council has agreed additional funding for the capital programme
totalling £10.803m to address specific costs related to dealing with COVID,
inflationary pressures arising as a consequence of the factors detailed in paragraph
2.3.3 below and other cost pressures on the capital plan. To date, £8.1m has been
allocated to projects leaving a balance of £2.703m available for allocation as
required. 
2.3.3  The impact of the pandemic along with the UK exit from the European Union, the
Russian invasion of Ukraine and sanctions on Russian owned entities has seen
significant price increases as well as disruptions to the supply chain and longer lead
Page 13

Page 14

in times. The increased rate of inflation impacts costs such as energy prices, labour,
packaging and transport. These all have an effect on the overall contract price and
make it extremely challenging to manage expenditure and the availability of supply.
As a result of this it should be noted that there are likely to be other significant
financial impacts which are not quantifiable at this stage. 
2.3.4 Actual net expenditure to date is £6.965m compared to a budget for the year to date
of £6.985m giving rise to an underspend for the year to date of £0.020m (0.29%).  
2.3.5 The forecast outturn for 2023-24 is a forecast net expenditure of £44.660m
compared to an annual budget of £44.976m giving rise to a forecast underspend for
the year of £0.316m (0.70%). 
2.3.6 The forecast total net projects costs on the capital plan are £213.649m compared to
a total budget for all projects of £213.599m giving rise to a forecast overspend for
the overall capital plan of £0.050m (0.02%).  
2.3.7 In respect of total project performance, there are 155 projects within the capital plan,
153 are complete or on target, 1 is off target and recoverable and 1 project is off
track.  
2.4 Treasury Monitoring Report 
2.4.1 This report provides information on the current levels and recent transactions in
relation to the capital financing limit, total borrowing, temporary borrowing and long
term borrowing and investments.   
2.4.2 The net movement in external borrowing for the period 1 April 2023 to 30 June 2023
was a decrease of £10.072m. 
2.4.3 Borrowing is below the Capital Financing Requirement for the period to 30 June
2023, at this stage in the financial year capital expenditure is below target. Capital
expenditure continued to be lower than anticipated over the last twelve months
however there is an expectation this will increase back up again over 2023-24 which
will continue to be monitored closely 
2.4.4 The levels of investments were £90.502m at 30 June 2023. The average rate of
return achieved was 4.437% which is below the target SONIA (Sterling Overnight
Index Average) rate for the same period of 4.578%. 
2.5 Reserves and Balances 
2.5.1 This report summarises the overall level of reserves and balances and monitors the
spending of the earmarked reserves, providing detailed information on the unspent
budget earmarked balances.   
2.5.2 The Council has a total of £666.354m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
2.5.3 At 31 March 2023, the Council had a total of £93.828m of usable reserves.  Of this: 
Page 14

Page 15

• £2.916m relates to the Repairs and Renewals Fund
• £4.503m relates to Capital Funds
• £86.409m was held in the General Fund, with £79.466m of this balance
earmarked for specific purposes. 
2.5.4  Of the earmarked balance of £79.466m:
• £37.305m is invested or committed for major initiatives/capital projects
• £29.842m is still to be drawn down in 2023-24
• £12.319m is planned to be spent in future years 
2.5.5 The table below summarises the position of the unallocated General Fund balance. 
Further explanation of the figures can be found at Section 3.4 of the Reserves and
Balances report.  
Heading Detail £000
Unallocated General Fund
as at 31 March 2023
This is the balance that is
unallocated over and above the 2%
contingency, which amounts to
£5.691m
1,252
Budgeted allocation to
General Fund for 2023-24
Budget
Per the Budget Motion at Council on
23 February 2023
19
Current Forecast Outturn
for 2023-24 as at 30 June
2023
This is from Social Work as other
departments have not yet reported
variances 
319
Social Work outturn
adjustment
Social Work would expect to transfer
their surplus to internal reserves
(319)
Estimated Unallocated
balance as at 31 March
2024 
1,271 
2.5.6 It can be seen that, after taking into consideration the Budget Motion, the current
forecast outturn for 2023-24, the expected adjustment in relation to the Social Work
outturn, the Council is forecast to have a £1.271m surplus over contingency. 
2.6 VIREMENTS OVER £0.200m (Revenue) 
2.6.1 Virement is the process of transferring budget between cost centres, services or
departments or between capital projects.  The Council’s constitution notes that
virements over £0.200m require approval by Council.  This section of the report will
be used to outline revenue virements in the period that require approval.   Capital
virements are included within the capital monitoring report.
Page 15

Page 16

2.6.2 For the period April to June, there are 4 virements requiring authorisation: 
- £0.325m within Social Work for the declaration of savings
- £0.296m harvested within Executive Director Kirsty Flanagan against the
vacancy savings target for the period April to June
- £0.322m harvested within Social Work against the vacancy savings target for
the period April to June
- £0.374m between Head of Education and Head of Legal and Regulatory
Support in relation to NPDO FM recharges 
2.6.3 There are also two virements relating to 2022-23 that require authorisation.  These
virements were completed late in the year end process therefore did not appear on
the report to Council on 29 June 2023 for authorisation.  They are: 
- £0.360m from Roads and Infrastructure to the Loans Fund to fund the
Harbour Investment Programme prudential borrowing repayments from the
increased fees and charges income
- £0.417m to Roads and Infrastructure from the Loans Fund to cover an
overspend in vehicle repairs. A delay in the Fleet Replacement Capital
Programme resulted in an underspend within the Loans Fund which was
transferred to offset this. 
3.  RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee: 
a) Consider the revenue budget monitoring report as at 30 June 2023 
b) Note the financial risks for 2023-24 
c) Note the capital plan monitoring report as at 30 June 2023 and approve the
proposed changes to the capital plan outlined in Appendix 4 of that report. 
d) Note the treasury monitoring report as at 30 June 2023 
e) Consider the reserves and balances report as at 30 June 2023  
f) Recommend to Council that the revenue virements over £0.200m during April to
June 2023 are approved 
g) Recommend to Council that the revenue virements over £0.200m outstanding
from 2022-23 year are approved, per paragraph 2.6.3 
Page 16

Page 17

4. IMPLICATIONS 
4.1 Policy – None.
4.2 Financial -  Outlines the revenue and capital monitoring for
2023-24 as at 30 June 2023
4.3 Legal -  None.
4.4 HR -  None.
4.5 Fairer Scotland Duty -   None.
4.5.1 Equalities – protected
characteristics - 
None.
4.5.2 Socio-economic Duty -  None.
4.5.3 Islands -  None.
4.6 Climate Change - None.
4.7 Risk -  Risks are included in financial risks report. 
4.8 Customer Service -  None. 
Kirsty Flanagan
Executive Director /Section 95 Officer
7 July 2023 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk 
Page 17

Page 18

REVENUE BUDGET MONITORING REPORT AS AT 30 JUNE 2023 POLICY AND RESOURCES COMMITTEE
10 AUGUST 2023 
2023-24 Overall Position:
There is a forecast underspend of £0.319m as at the end of June 2023.  This forecast relates entirely to Social Work and is due to a
combination of the over-recovery of vacancy savings and income from fees, charges and recharges.  This is offsetting financial pressures due
to high demand for services and the use of agency staff to fill staffing recruitment and retention gaps across Adult Services. 
There is a year to date overspend of £1.273m.  The year to date variances within the departments tend to relate to the timing of income and
expenditure and costs to capital not recharged yet. 
Key Highlights as at June 2023:  
• The projection currently being reported is an underspend from the Social Work service.   This will not impact the Council’s general fund
as the IJB is able to hold reserves. 
Key Financial Successes:
Performance against budget for 2022-23 was an overall net favourable position of £3.326m underspend after adjusting for year-end
earmarking.  This breaks down as:
• £0.347m net underspend in relation to Council service departmental expenditure
• £6.937m net underspend in relation to other central costs largely due to a one-off treasury gain as a result of a discount on the early
repayment of loans
• £0.652m over-recovery of Council Tax income
• £4.610m of unspent budget earmarkings 
Key Financial Challenges: Proposed Actions to address Financial Challenges:
Addressing the long-term impact of the COVID pandemic on service
demand and the increasing challenges facing departments across the
Council in relation to the recruitment and retention of suitably qualified
and experienced staff.
Engagement and monitoring of both issues with departments to
assess how these challenges are affecting service capacity and
capability, staff attendance, utilisation of agency staff and costs.
Collaboration with services and other back-office teams to consider
and develop mitigating actions.
Achieving a favourable year-end position and achieving savings targets
in light of council wide risks to expenditure. 
Robust monitoring of the financial position and delivery of savings to
ensure budget issues inform the budget monitoring process.
Monitoring Social Work expenditure and more widely the IJB position as
any overspend will transfer back to partner bodies in the first instance.  
Continue to work closely with the CFO of the IJB to ensure that early
indication of any potential adverse financial outturn is known and
corrective action is agreed as appropriate to reduce the risk to the
Council. 
Page 18

Page 19

Identifying further savings and delivering services more efficiently with
less resources, as whilst a balanced 2023-24 budget was agreed in
February 2023 there are still budget gaps in future years.
The Council will continue to progress savings options identified that
require further development and seek to identify further savings
through themed reviews and business process reviews.
Maintaining or improving the level of service income recovered, for
example planning, building standards and car parking.  
Actively monitor income recovery and ensure Council fees and
charges policies are regularly reviewed. 
Managing spend in service areas which are demand led and, to some
extent, outwith service control, for example Winter Maintenance. 
Use risk based approach to budget monitoring to focus additional
attention on these areas.
Ongoing requirement to fund unavoidable inflationary increases in areas
like utility costs, fuel, food etc. This is impacted further by the availability
of supply as a result of the COVID-19 pandemic, UK exit from the
European Union, Russia’s invasion of Ukraine and sanctions on Russian
owned entities to name a few influencing factors.
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be reported through the budget monitoring
and preparation processes. 
Cost of living crisis impacting on pay inflation negotiations which could
result in pay awards above what is deemed affordable.
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be reported through the budget monitoring
and preparation processes. 
Forecast Outturn Position
There is a forecast underspend of £0.319m for 2023-24 as at the end of June 2023
Page 19

Page 20

Department
Annual
Budget   
£'000
Forecast
Outturn   
£'000
Current
Forecast
Variance
£'000
Previous
Forecast
Variance
£000
Change
£000 Explanation
Chief Executive's Unit 920 920 0 0 0
Executive Director (Douglas Hendry) 129,376 129,376 0 0 0
Executive Director (Kirsty Flanagan) 54,247 54,247 0 0 0
Social Work 76,118 75,799 319 0 319
Underspend due to a combination of the over-recovery of vacancy savings and
income from fees, charges and recharges.  This is offsetting financial pressures
due to high demand for services and the use of agency staff to fill staffing
recruitment and retention gaps across Adult Services.
Central Budgets 26,371 26,371 0 0 0
Financed By (287,032) (287,032) 0 0 0
Total 0 (319) 319 0 319 
Page 20

Page 21

Further information on the departmental forecast variances is included later on in the report. 
0
500
May
June
July
August
September
October
November
December
January
February
£ 000
Forecast outturn position for each Department from the start of the financial year
Chief Executive's Unit
Executive Director (Kirsty Flanagan)
Executive Director (Douglas Hendry)
Social Work
Central Budgets
Financed By
Underspend
Overspend
Page 21

Page 22

Year to Date Position
The year to date position as at the end of June 2023 is an overspend of £1.273m and the main variances are noted below. 
Department
YTD
Actual
£'000
YTD
Budget
£'000
YTD
Variance   
£'000
Explanation
Chief Executive's Unit 261 240 (21)
Executive Director (Douglas Hendry) 34,194 33,608 (586)
Executive Director (Kirsty Flanagan) 14,032 10,807 (3,225)
Social Work 2,742 3,351 609
Central Budgets (721) 1,229 1,950
Funding (71,641) (71,641) 0
Total Net Expenditure (21,133) (22,406) (1,273)
The year to date variance is largely due to profiling of budgets as opposed to
geniune under or overspends.  This will be rectified in the coming weeks. 
Page 22

Page 23

Further information on the departmental year to date variances is included later on in the report. 
-25%
0%
25%
50%
75%
100%
Chief
Executive's
Unit
Executive
Director
(Kirsty
Flanagan)
Executive
Director
(Douglas
Hendry)
Social W
ork
Central
Budgets
TOTAL
Expenditure to date against the remaining budget for each
Department
YTD Actual Remaining Budget
Page 23

Page 24

OBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 30 JUNE 2023
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual Budget Forecast
Outturn
Forecast
Variance
Variance
£'000 £'000 £'000 % £'000 £'000 £'000 %
Departmental Budgets
Chief Executive's Unit 261 240 (21) (8.8%) 920 920 0 0.0%
Executive Director (Douglas Hendry) 34,194 33,608 (586) (1.7%) 129,376 129,376 0 0.0%
Executive Director (Kirsty Flanagan) 14,032 10,807 (3,225) (29.8%) 54,247 54,247 0 0.0%
Social Work 2,742 3,351 609 18.2% 76,118 75,799 319 0.4%
Total Departmental Budgets 51,229 48,006 (3,223) (6.7%) 260,661 260,342 319 0.1%
Central Budgets
Other Operating Income and Expenditure (1,936) 315 2,251 714.6% 3,656 3,656 0 0.0%
Joint Boards 313 374 61 16.3% 1,496 1,496 0 0.0%
Non-Controllable Costs 902 540 (362) (67.0%) 21,219 21,219 0 0.0%
Total Central Budgets (721) 1,229 1,950 158.7% 26,371 26,371 0 0.0%
TOTAL NET EXPENDITURE 50,508 49,235 (1,273) (2.6%) 287,032 286,713 319 0.1%
Financed By
Aggregate External Finance (53,082) (53,082) 0 0.0% (226,213) (226,213) 0 0.0%
Local Tax Requirement (18,559) (18,559) 0 0.0% (59,301) (59,301) 0 0.0%
Contributions to General Fund 0 0 0 0.0% (1,518) (1,518) 0 0.0%
Earmarked Reserves 0 0 0 0.0% 0 0 0 0.0%
Total Funding (71,641) (71,641) 0 0.0% (287,032) (287,032) 0 0.0%
(Deficit)/Surplus for Period (21,133) (22,406) (1,273) 0 (319) 319
CURRENT PROJECTED FINAL OUTTURNYEAR TO DATE POSITION
Page 24

Page 25

SUBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 30 JUNE 2023
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual
Budget
Forecast
Outturn
Forecast
Variance
Variance
£'000 £'000 £'000 % £'000 £'000 £'000 %
Subjective Category
Employee Expenses 40,285 40,462 177 0.4% 186,282 186,645 (363) (0.2%)
Premises Related Expenditure 2,458 2,678 220 8.2% 18,745 18,808 (63) (0.3%)
Supplies and Services 6,230 6,245 15 0.2% 23,471 23,439 32 0.1%
Transport Related Expenditure 3,314 3,070 (244) (8.0%) 17,489 17,429 60 0.3%
Third Party Payments 33,749 34,540 791 2.3% 168,739 168,846 (107) (0.1%)
Capital Financing (147) 0 147 14,523 14,523 0 0.0%
TOTAL EXPENDITURE 85,889 86,995 1,106 1.3% 429,249 429,690 (441) (0.1%)
Income (107,022) (109,401) (2,379) 2.2% (429,249) (430,009) 760 (0.2%)
(Deficit)/Surplus for Period (21,133) (22,406) (1,273) 0 (319) 319
YEAR TO DATE POSITION CURRENT PROJECTED FINAL OUTTURN
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget. 
Page 25

Page 26

CHIEF EXECUTIVE’S UNIT – AS AT 30 JUNE 2023 
The department is currently forecasting spend in line with budget. 
The department has a year to date overspend of £0.021m which can be attributed to profiling issues. 
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Chief Executive 920 920 0 0 0
Totals 920 920 0 0 0
Year to Date Position 
Key Financial Successes:
• All savings options have been delivered.  
• The department’s 2022-23 outturn position was an underspend of £0.017m.  This resulted from an overall underspend of £0.087m
offset by earmarking of £0.070m due to auto-carry forwards including unspent grants and third party contributions.   
Key Financial Challenges: Proposed Actions to address Financial Challenges:
To continue to deliver a high-quality service to support community
engagement and participation.
Regular monitoring, reflection and improvement cycle on service
provision to ensure most efficient use of staffing and financial
resources to meet national and local policy requirements for quality
engagement.
To continue to deliver a high quality support service function to community
organisations and community planning partners during a time of challenge
arising from continuing reductions in funding.
Seek to work in partnership with third sector organisations such as
the TSI in Argyll and Bute to efficiently deliver full package of support
to community organisations. Within the partnership working of the
0%
25%
50%
75%
100%
Chief Executive
Expenditure to date against the remaining budget for each
Service
YTD
Actual…
Remaining Budget
£000
Page 26

Page 27

CPP we seek to establish working groups and collate resources
within this to deliver high quality solutions to identified needs.
Demands for funding from community applications to the Supporting
Communities Fund higher than available annual funds by about 40%.
Continue to monitor fund criteria adapting this to align with priority
outcomes for Argyll & Bute and continue to support groups to seek
alternative sources of funding from our database of funding
providers.
Page 27

Page 28

CHIEF EXECUTIVE’S UNIT – OBJECTIVE SUMMARY AS AT 30 JUNE 2023 
Service Area YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Executive 88 70 (18) (25.7%) 328 328 0 0.0%
Post funded from earmarked
reserves - drawdown will be actioned
in July.
Community Planning
& Development 173 170 (3) (1.8%) 592 592 0 0.0% Outwith Reporting Criteria  
261 240 (21) (8.8%) 920 920 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%. 
Page 28

Page 29

CHIEF EXECUTIVE’S UNIT – SUBJECTIVE SUMMARY AS AT 30 JUNE 2023 
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 189 157 (32) (20.4%) 770 770 0 0.0% Overspend caused by posts funded from
earmarkings/other budgets - will be rectified in July
Supplies and
Services 3 3 0 0.0% 12 12 0 0.0% Outwith Reporting Criteria
Transport 2 4 2 50.0% 14 14 0 0.0% Underspend on staff travel budgets.
Third Party 67 79 12 15.2% 141 141 0 0.0% Profiling issues, will be rectified in July
Income 0 (3) (3) 100.0% (17) (17) 0 0.0% Profiling issues, will be rectified in July
Totals 261 240 (21) (8.8%) 920 920 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 29

Page 30

CHIEF EXECUTIVE’S UNIT – RED VARIANCES AS AT 30 JUNE 2023
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation      
0 0.0%   
A red variance is a forecast variance which is greater than +/- £50,000. 
Page 30

Page 31

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – AS AT 30 JUNE 2023  
The department is currently forecasting spend in line with budget. 
The department has a year to date (YTD) overspend of £0.586m (1.7%). The year to date overspend position is mainly due to the current
budget profile which will be refined through July.                             
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Executive Director
(Douglas Hendry) 85 85 0 0 0
Head of Commercial
Services 11,639 11,639 0 0 0
Head of Education 102,030 102,030 0 0 0
Head of Legal and
Regulatory Support 15,622 15,622 0 0 0
Totals 129,376 129,376 0 0 0
Year to Date Position 
Key Financial Successes:
The 2022-23 year-end consolidated outturn position was an under spend of £2.202m after adjusting for automatic earmarking.  Contributing
factors included:
• Effective contract management of NPDO and Hub School contracts, including a lower-than-expected insurance premium as a result of
the annual renegotiation of insurance costs. 
• Successful negotiations with utility suppliers achieved both historic water charge refunds and ongoing reductions to water rates.
• Implementation of NDEEF project resulting in recurring annual saving in utilities and a significant contribution to meeting Net Zero
targets.
• Income generation within Early Years.
• Increased rental income within One Council Property. 
0%
25%
50%
75%
100%
Executive Director
(Douglas Hendry)
Head of
Commercial
Services
Head of Education Head of Legal and
Regulatory Support
Expenditure to date against the remaining budget for each
Service
YTD… Remaining Budget…
Page 31

Page 32

Key Financial Challenges: Proposed Actions to address Financial Challenges:
The legacy impact of COVID-19 on our young learners has led to an
increased demand on the additional support need functions of the
Education Service in response to the growing health and wellbeing
needs of our young people and their families.
Analysis and review of delivery models, robust costings of any
service redesign required and continual monitoring of associated
budgets
Impact of the current cost of living crisis on the cost of the school day for
learners and their families.
Work with schools to ensure effective use of PEF to close the
poverty related attainment gap and identify other funding sources
to ensure equity of experience for all children.
Impact of the current cost of living crisis on uptake in demand led service
areas like catering, design services and licensing.
Continually refine/develop systems to accurately forecast outturns
and the impact on the future financial outlook. Strategies in place
to redesign services in line with future demand.
Ensure that Catering and Cleaning Services remain efficient and
effective given the requirement to increase free school meal provision for
P6/7 and Early Years, the impact of high inflation on produce and a
requirement to adhere to the Statutory Guidance supporting Nutritional
Requirements for Food and Drink in Schools (Scotland) Regulations
2020.
Support a longer-term service re-design project, including
collaborative working with partners and cross department support
with implementation of revised service delivery models. Continual
monitoring and review of costs and budgets, ensuring that any
efficiencies and savings are secured for the Council
Manage delivery of legislative/policy requirements that may not be fully
funded by Scottish Government therefore placing additional burdens on
the Council, for example, expansion of Universal Free School Meals for
P6 and 7s.
Analysis of new obligations and whether they incur additional costs
not met through increased funding allocations. Work will be
designed and implemented in the most effective way within
resource availability.
The Council has a requirement to deliver 1140 hours of Early Learning
and Childcare (ELC). The ring-fenced grant was reduced in 2022-23 and
again this year, reducing funding by £1.478m.  
Robust service costings, financial monitoring and timely reporting
to ensure the service can be delivered within the financial
resources available. Medium term forecasting on population to
shape ongoing service redesign. Analysis of potential to extend
income generation using “spare” capacity to trial paid care for
under 2’s
Impact of high inflationary uplifts within the NPDO/HUB School contracts. Ensuring continued effective contract management of NPDO/HUB
Schools to minimise the impact of high inflationary uplifts. 
Page 32

Page 33

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – OBJECTIVE SUMMARY AS AT 30 JUNE 2023
Service Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director (Douglas
Hendry)
Central/Managem
ent Costs
79 83 4 4.8% 85 85 0 0.0% Outwith Reporting Criteria
79 83 4 4.8% 85 85 0 0.0%
Head of
Commercial
Services
Catering 89 100 11 11.0% 1,302 1,302 0 0.0% The YTD underspend is due to the
timing of income and expenditure.
Head of
Commercial
Services
Central/Managem
ent Costs
328 285 (43) (15.1%) 1,676 1,676 0 0.0% The YTD overspend is due to
payment of the annual
maintenance costs for the catering
management system and
miscoding of catering equipment.
The coding error will be rectified in
the July monitoring period. 
Head of
Commercial
Services
CHORD 53 6 (47) (783.3%) 35 35 0 0.0% The YTD overspend is due to a
delay in processing recharge of
expenditure, this will be processed
in July.
Head of
Commercial
Services
Cleaning (66) 50 116 232.0% 599 599 0 0.0% The YTD underspend is due to the
income budget profile which will be
refined through July and the
reduced use of bank staff. 
Head of
Commercial
Services
Culture, Heritage,
Recreation &
Sport
1,374 1,398 24 1.7% 5,915 5,915 0 0.0% Outwith Reporting Criteria
Head of
Commercial
Services
Events &
Commercial
Catering
42 8 (34) (425.0%) 123 123 0 0.0% The YTD overspend is due to
under recovery of income and high
staff costs within Commercial
Café's. Finance assisting the
Service to look at cashflows,
pricing, menus and staffing to
recover current position.
Head of
Commercial
Services
Property Portfolio (99) (78) 21 (26.9%) (191) (191) 0 0.0% The YTD underspend is due to the
timing of income and expenditure.
Head of
Commercial
Services
Property Services 47 73 26 35.6% 673 673 0 0.0% The YTD underspend is due to
receipt of historic water refunds
Page 33

Page 34

offset by income accruals not yet
received for renewable energy.
Head of
Commercial
Services
Shared Offices 274 263 (11) (4.2%) 1,507 1,507 0 0.0% Outwith Reporting Criteria    
2,042 2,105 63 3.0% 11,639 11,639 0 0.0%  
Head of
Education
Additional Support
for Learning
2,492 2,526 34 1.4% 11,082 11,082 0 0.0% Outwith Reporting Criteria
Head of
Education
Central/Managem
ent Costs
581 463 (118) (25.5%) 1,695 1,695 0 0.0% The YTD overspend is due to the
current budget profile in computer
licenses and rental income which
will be refined through July.
Earmarked reserves require to be
drawn down to cover additional
temporary staffing costs.
Head of
Education
Community
Learning &
Development
(5) 1 6 600.0% 13 13 0 0.0% The YTD underspend is due to
accrued expenditure still
outstanding.
Head of
Education
COVID 7 0 (7) #DIV/0! 0 0 0 0.0% Funds to be drawn from Covid
earmarkings to match expenditure
which will eliminate adverse
variance.
Head of
Education
Early Learning &
Childcare
3,661 3,519 (142) (4.0%) 9,115 9,115 0 0.0% The YTD variance is due to the
current budget profile which will be
refined through July eliminating the
adverse variance.
Head of
Education
Primary Education 9,509 9,306 (203) (2.2%) 37,786 37,786 0 0.0% The YTD overspend is due to late
coding of Gaelic income and
profile related overspends which
will be refined through July and will
remove the adverse variance.
Head of
Education
Pupil Support 375 417 42 10.1% 2,324 2,324 0 0.0% The YTD underspend is due to the
current budget profile which will be
refined through July.  This will
change the YTD variance to a
£75k overspend in Schools
Residential Accommodation due to
a higher demand for service than
budget allows.
Head of
Education
Schools - Central
Services
706 369 (337) (91.3%) 2,452 2,452 0 0.0% The YTD overspend is due to an
overspend within Northern Alliance
that will be rectified through
income due to cover, earmarked
Page 34

Page 35

funds require to be drawn from
reserves to cover an overspend in
ERASMUS French and Spanish
training with the remaining
overspend being profile related
which will be refined through July
eliminating the adverse variance.
Head of
Education
Secondary
Education
8,393 8,421 28 0.3% 37,563 37,563 0 0.0% Outwith Reporting Criteria    
25,719 25,022 (697) (2.8%) 102,030 102,030 0 0.0%  
Head of Legal &
Regulatory
Support
Central/Managem
ent Costs
51 56 5 8.9% 272 272 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Community Safety 56 35 (21) (60.0%) 167 167 0 0.0% The YTD overspend is due to the
timing of income and expenditure.
Head of Legal &
Regulatory
Support
Elections 0 7 7 100.0% 36 36 0 0.0% The YTD underspend is due to the
timing of income and expenditure.
Head of Legal &
Regulatory
Support
Governance 151 165 14 8.5% 799 799 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Governance, Risk
& Safety
106 119 13 10.9% 577 577 0 0.0% The YTD underspend is due to
delays in recruitment of staff.
Head of Legal &
Regulatory
Support
Legal Services 157 141 (16) (11.4%) 750 750 0 0.0% The YTD overspend is due to the
timing of licensing income partially
offset by underspends in staffing
due to delays in recruitment.
Head of Legal &
Regulatory
Support
NPDO and Hub
Schools
5,471 5,495 24 0.4% 11,167 11,167 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Procurement,
Commercial and
Contract
Management
226 249 23 9.2% 1,216 1,216 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Trading Standards
& Advice Services
136 131 (5) (3.8%) 638 638 0 0.0% Outwith Reporting Criteria    
6,354 6,398 44 0.7% 15,622 15,622 0 0.0%      
34,194 33,608 (586) (1.7%) 129,376 129,376 0 0.0%   
Page 35

Page 36

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.  
Page 36

Page 37

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – SUBJECTIVE SUMMARY AS AT 30 JUNE 2023
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 23,593 23,882 289 1.2% 103,459 103,459 0 0.0%Non Education: The YTD underspend of £180k is made up of a £67k underspend in Legal and
Regulatory Support due to delays in recruitment and a £113k underspend in Commercial Services due
to delays in recruitment and lower than anticipated use of bank budgets in catering and cleaning.                                           
Education: £109k underspend is largely due delays in recruitment in schools and learning centres. 
Under the Scheme of Devolved School Management (DSM) schools are permitted flexibility at
yearend, therefore no forecast variance has been processed in relation to this                                                       
Premises 1,615 1,643 28 1.7% 7,604 7,604 0 0.0%Outwith Reporting Criteria
Supplies and
Services
2,887 2,894 7 0.2% 12,282 12,282 0 0.0%Outwith Reporting Criteria
Transport 82 74 (8) (10.8%) 296 296 0 0.0%Non Education: There is a YTD underspend of £6k due to more flexible ways of working and use of
technology for meetings reducing the need to travel.                                                                               
Education: YTD overspend of £14k within Primary and Secondary schools is due to  the timing of
expenditure and will continue to be monitored.
Third Party 8,612 8,646 34 0.4% 39,986 39,986 0 0.0%Outwith Reporting Criteria
Income (2,595) (3,531) (936) 26.5% (34,251) (34,251) 0 0.0%Non Education: The under recovery of Income within Commercial Services of £233k is due to profiling
of internal fees which will be refined during July and £94k within renewable energy due to profiling and
an income accrual not yet received.  Within Legal and Regulatory Services the profile for licensing
fees requires refining which will be done during July.                                                                
Education:  The £643k under recovery of income is due to late coding of £355k Gaelic funding and
the remainder is budget profile that will be refined during July which will eliminate the adverse
variance.                                                   
Totals 34,194 33,608 (586) (1.7%) 129,376 129,376 0 0.0% 
Page 37

Page 38

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%. 
Page 38

Page 39

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – RED VARIANCES AS AT 30 JUNE 2023 
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
A Red variance is a forecast variance which is greater than +/- £50,000. 
Page 39

Page 40

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – AS AT 30 JUNE 2023 
The department is currently forecasting spend in line with budget. 
The department has a year to date overspend of £3.225m (29.8%).  This is mainly due to income being behind profile in the Roads
Operational Holding Account due to Capital project timing and the profile of grant income in Piers and Harbours. Budget profiles will be
analysed and updated for the next reporting period.  
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Executive Director (Kirsty
Flanagan) (114) (114) 0 0 0
Head of Customer Support
Services 8,947 8,947 0 0 0
Head of Development and
Economic Growth 7,790 7,790 0 0 0
Head of Financial Services 5,677 5,677 0 0 0
Head of Roads and
Infrastructure Services 31,947 31,947 0 0 0
Totals 54,247 54,247 0 0 0
Year to Date Position 
Key Financial Successes:
During 2022-23 the department had an over-recovery of Planning Fee and Building Warrant income, an over-recovery of NDR commission
due to a successful debt recovery campaign during the year focusing on high level debts plus an over recovery of vacancy savings. 
0%
25%
50%
75%
100%
Executive
Director (Kirsty
Flanagan)
Head of
Customer
Support
Services
Head of
Development
and Economic
Growth
Head of
Financial
Services
Head of Roads
and
Infrastructure
Services
Expenditure to date against the remaining budget for each
Service
YTD
Actual
£000
Remaining Budget
£000
Page 40

Page 41

Key Financial Challenges: Proposed Actions to address Financial Challenges:
Ensuring that services spend to budget and do not overspend after the
department had an overspend of £1.5m after automatic earmarkings in
2022-23.
Detailed monitoring in the key areas overspent in 2022-23 to flag up
concerns early and mitigate before becoming an overspend. 
Department / Service ongoing ability to meet future savings / efficiency
requirements.
Monitoring of trends / expenditure levels / service configuration and
the Service Packages Policy Options savings process.
Rising cost of materials, software and consultancy services across the
service will result in a reduction in activity or overspends.
Costs are monitored regularly and contained as much as possible,
with any unavoidable overspends highlighted as soon as known.
Financial Services to continue to deliver a high-quality support service
function during a time of substantial uncertainty and challenge arising from
continuing reductions in funding whilst costs are increasing due to ongoing
high levels of inflation and service demand caused by world events.
Ensure the team is operating as efficiently and effectively as
possible by building resilience across the team and working
collaboratively with other services of the Council to support evidence
based decision making. 
Carry out the improvements identified during the Revenue and
Benefits Business Process Review to maximise income generation
and deliver efficiencies in service provision. 
Winter Maintenance costs are difficult to estimate as they are very much
dependant on the weather.  
Close monitoring of Winter Maintenance activity and reporting of the
financial implications through the budget monitoring process. The
Council agreed the winter policy, setting out the intervention level
and locations to be treated.  The number of treatments is determined
by weather conditions. The current budget provision provides for 58
full equivalent runs. There is a sophisticated weather monitoring
system in place consisting of several weather stations, this is
supported by a forecasting and meteorological service which is
collaboratively procured by West of Scotland local authorities.
Dangerous buildings costs as there is no budget for this expenditure and
the council has no control over the demand for the service.
Building Standards, Legal Services and Financial Services are
working closely to manage debt recovery and to consider other
options to minimise corporate risk exposure. 
Page 41

Page 42

Due to the nature of the various components of Waste Management there
are ongoing challenges with:
• The introduction of the Deposit Return Scheme
• Uncertainty with recycling income/ gate fee costs due to the           
volatility of the market
• Challenges in the legislative changes around the disposal of      
Biodegradable Municipal Waste 
To closely monitor all service components of Waste Management
and review the Waste Strategy in conjunction with our contractual
partner Renewi (previously Shanks). 
Page 42

Page 43

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 30 JUNE 2023
Service
Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director (Kirsty
Flanagan)
Central/Management
Costs
62 63 1 1.6% (114) (114) 0 0.0% Outwith Reporting Criteria.    
62 63 1 1.6% (114) (114) 0 0.0%  
Head of
Customer
Support Services
Central/Management
Costs
31 32 1 3.1% 174 174 0 0.0% Outwith Reporting Criteria.
Head of
Customer
Support Services
Communications 50 67 17 25.4% 325 325 0 0.0% Underspend in employee costs
due to vacancy which will be
used to cover future consultancy
costs.
Head of
Customer
Support Services
Customer Service
Centres
292 273 (19) (7.0%) 1,502 1,502 0 0.0% Outwith Reporting Criteria.
Head of
Customer
Support Services
HR 571 623 52 8.4% 2,593 2,593 0 0.0% Underspend in employee costs
due to vacancies which will used
to offset employee overspends
elsewhere plus unbudgeted
grant income received but not
yet spent.
Head of
Customer
Support Services
ICT 1,221 1,254 33 2.6% 4,297 4,297 0 0.0% Outwith Reporting Criteria.
Head of
Customer
Support Services
Registrars (32) (5) 27 (540.0%) 56 56 0 0.0% Underspend in employee costs
due to vacancies which will be
used to offset employee
overspends elsewhere.    
2,133 2,244 111 5.0% 8,947 8,947 0 0.0%  
Head of
Development &
Economic Growth
Airports 249 270 21 7.8% 1,210 1,210 0 0.0% Outwith Reporting Criteria.
Head of
Development &
Economic Growth
Building Control (135) 205 340 165.9% (84) (84) 0 0.0% Profile of income budget out of
alignment with actual income
received - will be kept under
review and adjusted if the
variance becomes material to
the Department's overall
position.
Page 43

Page 44

Head of
Development &
Economic Growth
Central/Management
Costs
127 110 (17) (15.5%) 583 583 0 0.0% Overspend in software costs in
GIS in comparison to profiling of
budget and will be rectified over
the financial year.
Head of
Development &
Economic Growth
Culture & Heritage 27 47 20 42.6% 228 228 0 0.0% Underspend in Rothesay
Pavilion due to not being
operational.
Head of
Development &
Economic Growth
Development
Management
(249) (77) 172 (223.4%) (16) (16) 0 0.0% Variance is due to the timing of
receipts for planning income
received.  Schedule of expected
Planning Applications to be
reviewed to determine any
potential over-recovery.
Head of
Development &
Economic Growth
Development Policy 83 81 (2) (2.5%) 395 395 0 0.0% Outwith Reporting Criteria.
Head of
Development &
Economic Growth
Economic
Development
(41) 328 369 112.5% 1,092 1,092 0 0.0% Grant income for Placed Based
Investment and Scottish Govt
Islands Programme received in
advance of expenditure.
Head of
Development &
Economic Growth
Environmental
Health
170 188 18 9.6% 1,281 1,281 0 0.0% Outwith Reporting Criteria.
Head of
Development &
Economic Growth
Environmental
Initiatives
24 24 0 0.0% 120 120 0 0.0% Outwith Reporting Criteria.
Head of
Development &
Economic Growth
Housing 1,176 881 (295) (33.5%) 2,745 2,745 0 0.0% Expenditure for HEEPS incurred
in advance of grant claim.
Head of
Development &
Economic Growth
Private Landlords (26) 0 26 0.0% 0 0 0 0.0% Outwith Reporting Criteria.
Head of
Development &
Economic Growth
Transportation
Policy
850 52 (798) (1534.6%) 236 236 0 0.0% Expenditure for SUSTRANS,
CWSS and SCSP incurred in
advance of grant claim.    
2,255 2,109 (146) (6.9%) 7,790 7,790 0 0.0%  
Head of Financial
Services
Accounting &
Budgeting
502 569 67 11.8% 2,668 2,668 0 0.0% Underspend due to the timing of
cash flows in comparison to
Page 44

Page 45

profiling of budget and will be
rectified over the financial year 
Head of Financial
Services
Internal Audit &
Fraud
64 75 11 14.7% 353 353 0 0.0% Underspend caused by
temporary slippage on a vacant
post. 
Head of Financial
Services
Revenues & Benefits 1,260 1,327 67 5.1% 2,102 2,102 0 0.0% Underspend due to the timing of
cash flows in comparison to
profiling of budget and will be
rectified over the financial year 
Head of Financial
Services
Scottish Welfare
Fund
10 (117) (127) 108.6% 554 554 0 0.0% Earmarkings requiring to be
drawn down against third party
payments paid out - this will be
rectified in next reporting period.    
1,836 1,854 18 1.0% 5,677 5,677 0 0.0%  
Head of Roads &
Infrastructure
Services
Amenity 891 790 (101) (12.8%) 3,139 3,139 0 0.0% Income budget profile out of
alignment with actual expected
income for Cemeteries and
Crematoria.  Overspend in Parks
due to CRA works and reduction
in Public Convenience income
due to delays in door charging
mechanisms.
Head of Roads &
Infrastructure
Services
Car Parking (84) (167) (83) 49.7% (571) (571) 0 0.0% Electric Vehicle Charger
electricity costs paid in advance
of income received.  Overspend
in DPE due to the timing of cash
flows in comparison to profiling
of budget and will be rectified
over the financial year.
Head of Roads &
Infrastructure
Services
Central/Management
Costs
688 655 (33) (5.0%) 3,060 3,060 0 0.0% Outwith Reporting Criteria.
Head of Roads &
Infrastructure
Services
Depots 67 (138) (205) 148.6% (429) (429) 0 0.0% Overspend due to profile of
income budget - profile to be
updated for next reporting
period.
Head of Roads &
Infrastructure
Services
Fleet & Transport 2,224 2,078 (146) (7.0%) 8,685 8,685 0 0.0% Overspend in Pupil Transport
due to additional employees and
profile of income budget which
will be rectified over the financial
year.
Head of Roads &
Infrastructure
Services
Infrastructure 124 146 22 15.1% 763 763 0 0.0% Small underspend due to timing
of works.
Page 45

Page 46

Head of Roads &
Infrastructure
Services
Marine (315) (995) (680) 68.3% (4,215) (4,215) 0 0.0% Underspend due to budget
profile for grant income - profile
to be updated for next reporting
period.
Head of Roads &
Infrastructure
Services
Network & Traffic
Management
62 17 (45) (264.7%) 182 182 0 0.0% Overspend due to timing of
income in comparison to
profiling of budget and will be
rectified over the financial year.
Head of Roads &
Infrastructure
Services
Road Safety 23 26 3 11.5% 123 123 0 0.0% Small underspend due to timing
of PPE purchases.
Head of Roads &
Infrastructure
Services
Roads & Lighting 2,721 944 (1,777) (188.2%) 7,089 7,089 0 0.0% Overspend due to timing of
income from Capital recharges
in comparison to profiling of
budget - profile will be updated
for next reporting period.
Head of Roads &
Infrastructure
Services
Waste 1,345 1,181 (164) (13.9%) 14,121 14,121 0 0.0% Overspend due to timing of
commercial refuse collection
income in comparison to
profiling of budget and will be
rectified over the financial year.    
7,746 4,537 (3,209) (70.7%) 31,947 31,947 0 0.0%      
14,032 10,807 (3,225) (29.8%) 54,247 54,247 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 46

Page 47

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – SUBJECTIVE SUMMARY AS AT 30 JUNE 2023
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 8,514 8,703 189 2.2% 43,504 43,504 0 0.0% Underspend due to vacant posts in HR, which will be used to
offset overspends elsewhere in the service, and the Roads
Operational Holding Account and Infrastructure Design
Teams, which will be offset against expenditure elsewhere
and reduced income from recharges.
Premises 511 629 118 18.8% 3,337 3,337 0 0.0% Underspend due to profile of Street Lighting Electricity and
will be rectified over the financial year.
Supplies
and
Services
2,788 2,511 (277) (11.0%) 8,827 8,827 0 0.0% Overspend due to heavy purchase of materials in Roads for
the Capital programme - these costs will be offset against
additional income when recharges are processed.
Transport 3,125 2,812 (313) (11.1%) 16,144 16,144 0 0.0% Overspend for vehicle repairs in Fleet which is offset against
additional income for recharges to the services.
Third Party 13,671 13,574 (97) (0.7%) 62,945 62,945 0 0.0% Overspend in Housing for HEEPS payments made against a
zero budget, which will be offset against the grant income
later in the year.  This overspend is partially offset with an
underspend in Roads due to outstanding invoices which
should be received in due course.
Capital
Financing
0 0 0 0.0% 2,398 2,398 0 0.0% Outwith Reporting Criteria.
Income (14,577) (17,422) (2,845) 16.3% (82,908) (82,908) 0 0.0% Under-recovery of income in Roads due to timing of
recharges to capital which is partially offset against grant
income received with zero budget for Placed Based
Investment and Scottish Govt Islands Programme, this grant
income will be offset against expenditure incurred later in the
year.
Totals 14,032 10,807 (3,225) (29.8%) 54,247 54,247 0 0.0%  
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 47

Page 48

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – RED VARIANCES AS AT 30 JUNE 2023 
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation             
A red variance is a forecast variance which is greater than +/- £50,000.
Page 48

Page 49

SOCIAL WORK – AS AT 30 JUNE 2023 
The department is currently forecasting an underspend of £0.319m (0.4%) which is due to the combination of the over-recovery of vacancy
savings and income from fees, charges and recharges. This is offsetting financial pressures due to high demand for services and the use of
agency staff to fill staffing recruitment and retention gaps across Adult Services.   
The department has a year to date underspend of £0.609m (18.2%) which is mainly due to the timing of payments, budget profiling across
services, the YTD over-recovery of vacancy savings and demand for purchased Children’s Services. This is partially offset by staffing
pressures, including the use of agency staff across Homecare and Older People Residential Units. 
Forecast Outturn Position  Year to Date Position 
-75%
-50%
-25%
0%
25%
50%
75%
100%
Chief Officer
Integration
Head of Adult
Services
Head of Children
and Families
Head of
Strategic
Planning and
Performance
Expenditure to date against the remaining budget
for each Service
YTD… Remaining Budget…
Key Financial Successes: 
Delivered an underspend of £3.556m at the end of 2022/23 after automatic earmarkings of £1.078m. The total underspend of £4.634m has
been transferred to IJB reserves and should allow for future investment and transformation across Social Work. 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Chief Officer Integration (342) (519) 177 0 177
Head of Strategic Planning
and Performance 499 492 7 0 7
Head of Health and
Community Care 39,205 39,107 98 0 98
Head of Acute and
Complex Care 20,082 20,165 (83) 0 (83)
Head of Children and
Families 16,674 16,554 120 0 120
Totals 76,118 75,799 319 0 319
Page 49

Page 50

Key Financial Challenges: Proposed Actions to address Financial Challenges:
Deliver the outstanding savings total for 2023/24 of £0.956m (as at June
2023).
Maintain a close working relationship with the HSCP Service
Improvement Team in order to quickly and efficiently identify and
assess options for delivering the outstanding savings. 
Development and delivery of future service redesigns which will be
necessary to contain service expenditure within the allocated resource,
noting that in year savings still need to be identified for 23/24 to cover
23/24 budget gap, as well as budget gaps in future years. 
Support from finance to assist strategic managers to develop and
identify further savings and to look beyond the short term to identify
and plan the changes which will be needed to address the expected
ongoing budget challenge over the current, and future, years.
Use of agency staff to support service delivery across Social Work, but
particularly in Older People services, due to recruitment and retention
challenges within the service. Year to date spend at June 2023 of
£0.656m; with a forecast spend of £0.868m by the end of the year. 
Close working relationship with the HSCP to support the costing of
a plan to stabilise the service and ensure it is operationally and
financially sustainable. This includes an exit plan from the reliance
on agency staff. 
Cost of living crisis affecting pay inflation negotiations and financial
sustainability of service providers, which could affect affordability, and
sustainability of service delivery. 
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be reported through the budget monitoring
and preparation processes.  Page 50

Page 51

SOCIAL WORK – OBJECTIVE SUMMARY AS AT 30 JUNE 2023
Service Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Officer
Integration
Integration
Headquarters
54 134 80 59.7% 569 579 (10) (1.8%) The YTD position is due to payroll
underspends and outstanding 22/23 accruals.
The forecast variance is outwith reporting
criteria.
Chief Officer
Integration
Social Work
Central
Support
(1,146) (1,076) 70 (6.5%) (911) (1,098) 187 (20.5%) The YTD variance is due to over-recovery on
vacancy savings, combined with underspends
on centrally held funds and payroll
underspends. This is further impacted by
profiling of the central repairs budget which is
showing a YTD underspend. The forecast
underspend is due to an over-recovery on
vacancy savings combined with underspends
on centrally held funds. 
(1,092) (942) 150 53.2% (342) (519) 177 (22.3%)  
Head of
Strategic
Planning &
Performance
Management
& Central
Costs
92 88 (4) (4.6%) 465 468 (3) (0.6%) Outwith reporting criteria.
Head of
Strategic
Planning &
Performance
Service
Development
9 13 4 30.8% 34 24 10 29.4% The YTD and forecast variance are due to
staff vacancies giving both a payroll
underspend and an under-recovery on
Charges to Health Boards.    
101 101 0 26.2% 499 492 7 28.8%  
Head of
Health and
Community
Care
Management
& Central
Costs
45 90 45 50.0% 571 570 1 0.2% The YTD variance is as a result of timing of
payments to third parties. The forecast
variance is outwith reporting criteria.
Head of
Health and
Community
Care
Older People 2,315 2,468 153 6.2% 38,634 38,537 97 0.3% The YTD variance reflects the over-recovery
on income as well as timing of payments to
third parties. This is partially offset by YTD
overspends on employee costs due to use of
agency staff. The forecast underspend is due
to the forecast over-recovery of income from
charges to clients for residential care
combined with underspends in Homecare as a
result of capacity issues which have reduced
the volume of service provided. This is all
partially offset by overspends on residential
Page 51

Page 52

placements for the same reasons; reflecting a
temporary shift in the balance of care. 
2,360 2,558 198 7.7% 39,205 39,107 98 0.2%  
Head of
Acute and
Complex
Care
Learning
Disabilities
(1,777) (1,763) 14 (0.8%) 14,355 14,366 (11) (0.1%) Outwith reporting criteria.
Head of
Acute and
Complex
Care
Management
& Central
Costs
18 29 11 37.9% 130 127 3 2.3% The YTD variance is as a result of the timing
of payments to third parties. The forecast
variance is outwith reporting criteria.
Head of
Acute and
Complex
Care
Mental Health (189) (112) 77 (68.8%) 2,768 2,896 (128) (4.6%) The YTD variance is as a result of staffing
vacancies which have not yet been transferred
to vacancy savings combined with timing of
payments to third parties.  The forecast
overspend reflects higher than budgeted
demand for services in Supported Living and
Residential Placements combined with
overspends on staff costs due to the use
agency staff.
Head of
Acute and
Complex
Care
Physical
Disability
140 131 (9) (6.9%) 2,829 2,776 53 1.9% The YTD variance is outwith reporting criteria.
The forecast underspend reflects known
demand for Residential Placements partially
offset by overspends on Supported Living and
Respite due to demand. 
(1,808) (1,715) 93 (38.5%) 20,082 20,165 (83) (0.5%)  
Head of
Children &
Families
Child
Protection
613 720 107 14.9% 3,703 3,597 106 2.9% The YTD variance is as a result of staffing
vacancies which have not yet been transferred
to vacancy savings combined with timing of
income receipt.  The forecast underspend is
as a result of demand for contact and welfare
services as well as forecast underspends in
the Area Teams on payments to other bodies,
travel and subsistence.
Head of
Children &
Families
Children with
a Disability
141 224 83 37.1% 986 967 19 1.9% The YTD variance is as a result of budget
profiling and invoice timing for payments to
other bodies.  The forecast variance is outwith
reporting criteria.
Head of
Children &
Families
Criminal
Justice
82 14 (68) (485.7%) 224 204 20 8.9% The YTD variance is as a result of budget
profiling for income receipt. Scottish
Government grant income has been received
slower than anticipated. This is partially offset
by staffing underspends due to turnover and
Page 52

Page 53

vacancies. The forecast variance is outwith
reporting criteria.
Head of
Children &
Families
Looked After
Children
1,668 1,664 (4) (0.2%) 7,894 7,938 (44) (0.6%) Outwith reporting criteria.
Head of
Children &
Families
Management
& Central
Costs
677 727 50 6.9% 3,867 3,848 19 0.5% The YTD variance is due to the timing of
receipt of grant income - in advance of
anticipated expenditure - combined with
budget profiling and timing of receipt of
invoices for rental costs.  The forecast
variance is outwith reporting criteria.    
3,181 3,349 168 5.0% 16,674 16,554 120 0.7%  
GRAND
TOTAL   2,742 3,351 609 18.2% 76,118 75,799 319 0.4%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.  
Page 53

Page 54

SOCIAL WORK – SUBJECTIVE SUMMARY AS AT 30 JUNE 2023 
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 7,263 7,040 (223) (3.2%) 34,642 35,005 (363) (1.1%) The YTD and forecast overspend is due to the use of
agency staff across the HSCP (£648k YTD; £860k
forecast). This is partially offset by over-recovery on
vacancy savings and payroll underspends due to
vacancies.
Premises 391 405 14 3.5% 1,536 1,599 (63) (4.1%) The YTD underspend is outwith reporting criteria.
The forecast overspend is due to anticipated
overspends on utilities as well as on safety and
property maintenance in the residential units and day
services.
Supplies &
Services
516 545 29 5.3% 1,037 1,005 32 3.1% The YTD and forecast underspends are outwith
reporting criteria.
Transport 99 171 72 42.1% 678 618 60 8.9% The YTD and forecast underspend is due to various
travel underspends across the whole department
following changes to working practices post Covid-19
and the number of staff vacancies.
Third Party 10,989 11,724 735 6.3% 62,187 62,294 (107) (0.2%) The YTD underspend is largely due to budget profiling
and timing of payments to third parties. 
The Forecast overspend is due to demand for
purchased care services across Adult Services.
Income (16,516) (16,534) (18) 0.1% (23,962) (24,722) 760 (3.2%) The YTD under-recovery of income is outwith
reporting criteria.
The forecast over recovery of income is mainly due to
increased income from fees, charges and recharges.
Totals 2,742 3,351 609 18.2% 76,118 75,799 319 0.4%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 54

Page 55

SOCIAL WORK – RED VARIANCES AS AT 30 JUNE 2023
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Social Work
Central Support (911) (1,098) 187 (20.5%) The forecast underspend is due to an over-recovery on vacancy savings combined with
underspends on centrally held funds. 
Older People 38,634 38,537 97 0.3%
The forecast underspend is due to forecast over-recovery of income from charges to clients for
residential care combined with underspends in Homecare as a result of capacity issues which
have reduced the volume of service provided. This is all partially offset by overspends on
residential placements for the same reasons; reflecting a temporary shift in the balance of care. 
Mental Health 2,768 2,896 (128) (4.6%) The forecast overspend reflects higher than budgeted demand for services in Supported Living
and Residential Placements combined with overspends on staff costs due to agency.
Physical Disability 2,829 2,776 53 1.9% The forecast underspend reflects known demand for Residential Placements partially offset by
overspends on Supported Living and Respite due to demand. 
Child Protection 3,703 3,597 106 2.9% The forecast underspend is as a result of demand for contact and welfare services as well as
forecast underspends in the Area Teams on payments to other bodies, travel and subsistence. 
A red variance is a forecast variance which is greater than +/- £50,000. 
Page 55

Page 56

MONITORING OF SAVINGS – AS AT 30 JUNE 2023
New policy savings were identified for the three year period 2023-24 to 2025-26 and these were agreed by Council in February 2023.  Council
agreed to policy savings of £6.145m in 2023-24 rising to £6.260m by 2025-26. 
The position of historical policy saving options is as follows:
- 2022/23 – those not delivered or that have further increases in value in 2023-24 onwards total £0.187m
- 2021/22 – those not delivered or that have further increase in value in 2023-24 onwards total £0.195m
- 2020/21 – those not delivered total £0.050m
- 2019/20 – all delivered
- 2018/19 - those not delivered total £0.376m
The 2023-24 savings have been removed from departmental budgets, however, it is important to monitor whether the saving has actually been
delivered to ensure that costs are not continuing resulting in an overspend by the end of the year.  It is also important to ensure that any
preparatory work required to deliver savings in future years is on track. 
There are two savings where the department has indicated they will not be achieved, two are categorised as having a potential shortfall and one
is currently delayed as summarised below: 
Saving Saving
Agreed
Status Detail Shortfall/
Delayed
Value
TB07 – Depots  Feb-18 Will not be achieved  Savings to date via the Oban project, tidying up NDR costs from
previous disposals and removing security costs. 
The remainder of the outstanding saving is based on removing the
smallest depot budget from each town but we cannot do this without
the capital investment to create fit for purpose single depot facilities. 
Working through possible alternative delivery model and updated
business case for Lochgilphead – there is a shortfall between
possible capital costs and likely income from vacated sites. 
This saving will not be achieved and a cost pressure has been put
through for this for 2024-25.  Work will be ongoing on the depot
rationalisation across the area and future savings will be brought
once known.
£107,500
Page 56

Page 57

R&I17 - Public transport
fare scale increase
Feb-21 Will not be achieved   Fare increase did not offset the saving advised by the Stantec review. 
This saving will not be achieved and a cost pressure has been put
through for this for 2024-25.
£29,000
TB13b Roads and
Amenity Services
charging (non-statutory
services)
Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
The original proposal was to introduce charges for providing lighting
design and increase charges by 20% for road construction consents,
skips, scaffolds, hoarding, permits and licences. Whilst some
additional income has been generated through third party works,
opportunities are expected to be limited over the foreseeable future
due to staff shortages and other competing demands.
£150,000
TB12b Stadiums Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
Discussions had stalled with partners in the Oban and Lorn area with
regard to Mossfield stadium to create a sports Hub, attract external
funding to improve facilities and therefore attract additional events to
the arena.  The users group has now reconvened and will be
reporting to the steering group. It should be noted there is generally a
downturn in usage of pitches partly due to more clubs booking all
weather pitches at high schools and the loss of a well established
club disbanding which will result in the loss of income. The Mossfield
Sport Group have highlighted that certain clubs along with the Shinty
Associations have expressed concerns with regards to the condition
of the Pavilion and changing facilities and this is likely to impact on
income.  East King Street bookings have reduced due to the
condition of the changing facilities and clubs having to play their
fixtures elsewhere.
£30,000
TB09 – Public
Conveniences
Feb-18 Delayed - The full
saving will not be
achieved in line with
the original estimated
timescale.  
Door access control project has an indicative start date of July for
installs.   This should see the system being in place across the busy
summer months. We have no way to accurately predict income levels
but the system allows for regular reporting and itemisation so we will
quickly be in a position to profile future income.
£24,000 
All policy saving options previously agreed are noted in the table below for information. 
Page 57

Page 58

2023-24 2023-24
£000 FTE
Executive Director Douglas Hendry
CS01 Feb-22 Commercial
Services
Climate Change & Resource Efficiency 63.0 0.00 On Track to be Delivered
CS03 Feb-22 Commercial
Services
Stretch Targets for One Council Income &
Events
20.0 0.00 Delivered
EDU2324-001 Feb-23 Education Estimated saving due to change in pupil
numbers
700.00 0.0 Delivered
EDU2324-002 Feb-23 Education Removal of non-statutory Cultural
Coordinator post.
15.00 0.8 Delivered
Executive Director Kirsty Flanagan
DEG05(a) Feb-20 Development
and Economic
Growth
Raise additional fees by adopting the
current Building Cost Information Service
(BCIS) guide for the cost of building work.
Regular service users have been
informed of this change.
50.00 0.0 Delivered
DEG07 Feb-21 Development
and Economic
Growth
Additional income through fees and
charges for s64 Non-Material Amendment
Submissions, non e-planning application
submissions and property history
searches
28.00 0.0 Delivered
DEG01 Feb-22 Development
and Economic
Growth
Crown Estate Administration Contribution
to Project Delivery
104.0 0.00 Delivered
DEG2324-002 Feb-23 Development
and Economic
Growth
Reduce discretionary budget to minimum.
Retain budget to pay memberships to
SCDI, SLAED & HOPS but remove
remainder of discretionary budget.
21.50 0.0 Delivered
DEG2324-001 Feb-23 Development
and Economic
Growth
Long-term vacant 0.5FTE building
standards surveyors post that arose
through an employee reducing their
working hours is no longer requires in
structure.
24.00 0.5 Delivered
FIS2324-001 Feb-23 Financial
Services
Service Concessions - Alteration to
accounting treatment to align the
repayment of borrowing relating to new
schools over their asset life.  Guidance
from Scottish Government now permits
this change of accounting treatment. 
Further detail will be provided to Council in
due course.
4,831.00 0.0 On Track to be Delivered
FIS2324-002 Feb-23 Financial
Services
The Service has identified savings
through rightsizing of budgets, an
organisational restructure with investment
in modern apprenticeships and temporary
staff designed to boost income from the
billing of additional local taxes and the
recovery of associated debt. In addition
efficiency savings from increased
productivity, increased levels of process
automation and moving more customers
to transact with the service over the
internet will allow previously outsourced
review works to be carried out internally.
493.00 0.0 On Track to be Delivered
TB07 Feb-18 Roads and
Infrastructure
Services
Create one main depot in key areas to
reduce costs
172.50 0.0 Will not be achieved
TB13b Feb-18 Roads and
Infrastructure
Services
Roads & Amenity Services charging (non-
statutory services)
150.0 0.00 Potential Shortfall
TB12b Feb-18 Roads and
Infrastructure
Services
Review charges for stadiums to enable
improvement work
30.00 0.0 Potential Shortfall
TB09 Feb-18 Roads and
Infrastructure
Services
Public Conveniences - Progress
sustainable models including turnstiles
and franchising; establish simpler asset
transfer process
24.00 0.0 Delayed
R&I17 Feb-21 Roads and
Infrastructure
Services
Public transport fare scale increase 76.00 0.0 Will not be achieved
R&I05 Feb-21 Roads and
Infrastructure
Services
Design service fees - bringing in line with
industry standards and reduce cost of
consultancy. Two posts created as a
spend to save
50.00 -2.0 Delivered
R&I09 Feb-21 Roads and
Infrastructure
Services
Road inspections find and fix -  reduce
reactive work by proactivity. Moving to AI
technology as technology develops
40.00 1.0 On Track to be Delivered
R&I15 Feb-21 Roads and
Infrastructure
Services
Emergency services support and fuel
provision from our fuel supplies
0.50 0.0 Still to be Implemented
RIS2324-001 Feb-23 Roads and
Infrastructure
Services
Support Communities to move to different
approaches to delivering School Crossing
Patrols through engagement with Parent
Council and Communities.
60.00 8.4 On Track to be Delivered
TOTAL 6,952.5 8.7
Template Ref Saving
Agreed
Service Savings Option Status of Implementation
Page 58

Page 59

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE 
10 AUGUST 2023
FINANCIAL RISKS ANALYSIS 2023-24  
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to provide a summary of the key financial risks
facing the Council.   
1.2  A number of Council wide risks, both revenue and capital, have been identified
along with risks for each department and service of the Council.  For each
departmental risk the financial impact has been quantified and the likelihood
assessed based on the standard risk matrix. 
1.3 There are 6 Council wide revenue risks identified for 2023-24 currently amounting
to £3.661m. 
1.4 There are currently 39 departmental risks totalling £4.800m.  Of the 39
departmental risks, 4 are categorised as likely.   
1.5 The financial risks are monitored routinely and actions put in place to continue to
mitigate the risks.   
Page 59

Page 60

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE 
10 AUGUST 2023
FINANCIAL RISKS ANALYSIS 2023-24  
2. INTRODUCTION 
2.1 This report outlines the process and approach developed in carrying out a
financial risks analysis and provides a note of the current assessment of financial
risks for 2023-24. 
3 DETAIL 
3.1 Introduction 
3.1.1 The Council is currently in a period of significant financial challenge.  In
developing its budget to address both restricted resources and cost and demand
pressures there are a number of financial risks the Council needs to consider and
manage. 
3.1.2 There are a number of risks that affect the income or expenditure across the
whole council and these have been identified.  Financial risks have been
considered by each department and service of the Council.   
3.1.3 For each risk, the financial impact has been quantified and the likelihood
assessed based on the standard risk matrix as follows: 
1 – Remote
2 – Unlikely
3 – Possible
4 – Likely
5 – Almost Certain 
3.1.4 The Argyll and Bute Integrated Joint Board (IJB) with responsibility for Social
Work and a range of Health services was established and came into effect on 1
April 2016.  The IJB is responsible for financial and strategic oversight of these
services.  It is the responsibility of the IJB to consider the individual financial risks
associated with Integration Services and they are therefore not contained within
this report.  A Council wide risk has been included in respect of the IJB being
unable to deliver the social care service within the budget allocated. 
3.2 Council Wide Risks 
Revenue  
3.2.1 Utility costs remain a volatile area and it is difficult to accurately predict how the
prices could vary.  The outturn in respect of utilities for 2022-23 was an overspend
of £0.597m which was due to the unprecedented inflationary uplifts within the
Page 60

Page 61

energy market although forward purchasing sheltered the Council from the full
impact.  With the volatility of utilities pricing it is very difficult to predict the impact
going forward but a financial risk based on a 20% variation in utility costs amounts
to £0.827m. 
3.2.2 The 2023-24 budget includes a 3.5% pay award assumption for SJC and Chief
Officer staff groups.  Negotiations on the 2023-24 award are in progress and due
to the high level of inflation, it is increasingly likely that the Trade Unions will
looking to negotiate a deal at more than 3.5%.  However, the affordability for
Local Government has to be considered and based on future estimates, anything
above a 3.5% pay award is deemed to be unaffordable, hence why the budget
outlook has been based on 3.5%.  This is a situation that will be kept under close
review as the pay negotiations advance during the year and the assumption will
be adjusted as required.  For each 1% more than the 3.5% built in, there would be
an additional cost of around £0.826m.  The financial risk is recognised at £0.826m
at this stage.  It should be noted that the Teachers pay award for 2023-24 is
already settled and built into the budget. 
3.2.2 At the budget meeting on 24 February 2023, the Council agreed 6 new policy
savings options that would deliver savings over the period 2023-24 to 2025-26. 
The savings to be delivered in 2023-24 amount to £6.145m.  Whilst the Council
have a good track record in delivering savings, a 10% shortfall on this savings
target would amount to £0.615m. 
3.2.3 The estimated level of council tax income is based on current and forecast Band
D equivalents and non-payment rates.  This reflects our most recent experience in
terms of the council tax base and likely collection rates.  A 1% variation in council
tax income amounts to approximately £0.593m.  
3.2.4 In respect of the Health and Social Care Partnership, it is the responsibility of the
Chief Officer and Chief Financial Officer to manage the HSCP financial position. 
If an overspend is forecast, a budget recovery plan will be prepared and
submitted to the IJB, the Council and NHS Highland.  Where recovery plans are
unsuccessful and an overspend occurs at the financial year end, and the HSCP
has insufficient reserves to meet the overspend, then the partners will be required
to make additional payments to the HSCP.  Whilst any additional payments by the
Council and NHS Highland will be deducted from future years funding, there is still
a financial risk that the Council may have to pay out additional monies in year.  As
at 30 June 2023, the net HSCP outturn in 2023-24 is estimated to be a £0.631m
overspend (underspend of £0.319m from Social Work and an overspend of
£0.950m from Health).  As Social Work are currently projecting an underspend
and the IJB holds significant financial reserves, there is a nil value on the risk.   
3.2.5 There is an ongoing requirement to fund unavoidable inflationary cost increases in
areas like fuel, food etc. This has been predominantly caused by the lack of
availability of supply of labour and materials as a result of the COVID-19
pandemic, the UK exit from the European Union, Russia’s invasion of Ukraine and
sanctions on Russian owned entities.  Inflation has begun to fall and the Bank of
England estimates that it should continue to fall this year.  We will continue to
closely monitor the situation and update our financial forecasts using the best
Page 61

Page 62

information available to us. A 1% general inflation increase has been included
with a financial impact of £0.800m. 
3.2.6  The Council wide risks are noted within the table below.   
Description Likelihood Assessed
Financial Impact
£000
Energy costs increase by 20% greater
than anticipated
3 827
Pay award exceeding 3.5% 3 826
10% shortfall on Savings Options 2 615
1% variation in Council Tax Income 2 593
IJB refer to Council for additional
funding to deliver social work services
1 0
1% variation of General Inflation Risk  4 800
Total  3,661 
Capital 
3.2.7 The finance settlement announcement on 20 December 2022 provided details of
the Local Government funding for 2022-23 and there is therefore certainty as to
what our funding is in respect of the General Capital Grant and the specific capital
grants already distributed. 
3.2.8  The capital plan for 2023-24 includes an estimate of £1.195m in respect of capital
receipts.   This is based on an assessment provided by the Special Projects Team
in January 2023.  A 10% variation equates to £0.120m and this would require to
be managed across the capital programme.   
3.2.9 
3.2.10 
3.2.11
General feedback from Scotland Excel and the Project Managers indicates that
price increases and uncertainty continue to be experienced as well as disruptions
to the supply chain and longer lead times, particularly in relation to the
construction sector and material availability. This can be attributed to a number of
factors such as the COVID-19 pandemic, UK exit from the European Union,
Russia’s invasion of Ukraine and sanctions on Russian owned entities, to name a
few. 
The increased rate of inflation impacts costs such as energy prices, labour,
packaging and transport. These all have an effect on the overall contract price
and make it extremely challenging to manage expenditure and the availability of
supply. 
While it has been possible to estimate the impact of these pressures on some
projects, and therefore either include those projections within the capital
monitoring report or adjust the capital programme accordingly, for others it is
more difficult and no forecast has been projected at this stage but there are likely
to be further significant financial impacts not yet reported. 
Page 62

Page 63

3.3  Departmental/Service Risks 
3.3.1 The detail of each departmental financial risk is included within Appendix 1.  The
following table provides a summary of the number of risks within each department
and likelihood category with the financial impact. 
Department 1 - Remote 2 - Unlikely 3 - Possible 4 - Likely 5 - Almost
Certain Total
No £000 No £000 No £000 No £000 No £000 No £000
Chief Executive's
Unit 0 0 0 0 0 0 0 0 0 0 0 0
Executive Director
Douglas Hendry 2 20 6 560 9 720 3 430 0 0 20 1,730
Executive Director
Kirsty Flanagan 5 335 2 230 11 2,405 1 100 0 0 19 3,070
Total 7 355 8 790 20 3,125 4 530 0 0 39 4,800 
3.3.2 The current top three risks in terms of the financial impact are noted in the table
below. 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance -
Bridges, Culverts
& Sea Defences
Extreme localised weather may
result in loss of bridge, culvert,
road or sea defence.
3 750
Roads and
Infrastructure
Services
Winter
Maintenance
Adverse weather conditions
which require greater than
budgeted number of gritting
runs.
3 365
Financial
Services
Council Tax Debt
Collection
Recovery
Recovery of debt becomes more
difficult to pursue in the current
economic climate.  This is in
relation to historical debt that
has accumulated over many
years therefore any adverse
collection rates will impact on
the year-end bad debt provision
as opposed to the in-year
financial position, hence no
forecast variance has been
reported within the current year.
3 345 
Page 63

Page 64

3.3.3 The risks which are likely are noted below: 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Council Wide -
Commercial
Services
Council Wide
Central Repairs
Increased demands on central
repair budgets (CRA) as a result
of a decrease in Capital funding,
increase in statutory and
emergency repairs and
increases in supplier/contractor
charges.  This impacts on all
departments of the Council with
a Central Repairs Budget.
4 300
Legal and
Regulatory
Support
Contract RPI for
NPDO and Hub
Schools
Increase in RPI would result in
higher costs.
4 100
Roads and
Infrastructure
Services
Street Lighting Age of lighting stock requires
greater maintenance as health
and safety becomes a
consideration.
4 100
Legal and
Regulatory
Support
Licensing Reduced numbers of licensing
applications leading to reduced
income.
4 30 
3.4 Changes to Financial Risks since last report 
3.4.1 There have been 5 changes to the departmental risks since the financial risks
report was presented to the Council on 23 February 2023, as follows: 
- The risk in relation to catering costs due to changes in food and drink
standards in schools has been removed as it is now covered within the
Catering Purchases risk. 
- The risk in relation to Education central repairs has been removed as it is
covered within the risk ‘Council Wide Central Repairs’. 
- A new risk in relation to reduced levels of car parking income has been
added to recognise the possibility that reduced income levels seen in 2022-
23 continue into 2023-24 due to reduced visitors.
- The risk in relation to ASN support has been increased from 100 to 200 in
recognition of increased applications at August.  The amount being
recognised matches the demand pressure being put forward for 2024-25.
- The risk relating to catering purchase inflation has been reduced from
‘Likely’ to ‘Unlikely’ because the budget has been right sized through
inflationary uplifts.  
Page 64

Page 65

3.5 Monitoring of Financial Risks 
3.5.1 Financial risks will be reviewed and monitored on a two monthly basis and will be
included in the pack of financial reports submitted to Policy and Resources
Committee.   
3.6 Potential Future Risks 
3.6.1 Scottish Government are, over the next 2 years, proposing to extend funded
childcare to all 1 and 2 year olds across Scotland. This brings significant financial
and qualitative risks to the service. The needs and legislative requirements for this
age range would mean significant capital work across our estate and in many
settings there is not the space so extensions would be required. Having this age
range in the same play space as 3/4 year olds seriously impacts on the ability of
practitioners to effectively support age appropriate learning and play. It is
uncertain when this risk will arise. 
4 CONCLUSION 
4.1 This report summarises the key financial risks facing the Council.  There are six
Council wide risks and 39 departmental risks identified with 4 categorised as
likely.  The financial risks are monitored routinely and actions put in place to
continue to mitigate the risks.   
5 IMPLICATIONS 
5.1 Policy - None.
5.2 Financial -  The financial value of each risk is included within the
appendix.   
5.3 Legal -  None.
5.4 HR -  None.
5.5 Fairer Scotland Duty - None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty -  None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  Financial risks are detailed within the appendix.
5.8 Customer Service -  None. 
Kirsty Flanagan
Executive Director/Section 95 Officer
7 July 2023 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
APPENDICES
Appendix 1 – Detail of Department/Service financial risks
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 65

Page 66

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2023
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Commercial Services Catering Costs - Provision of
Meals to Early Years Children
The Children and Young People (Scotland) Act placed duties
on Councils to provide meals in an Early Years setting to
entitled children where sessions span over lunch time.  The
total quantum of grant funding is reducing and may not be
sufficient to fund the additional costs depending on uptake
and the additional costs to support the meal provision in
partner provider settings.
Joint strategy with procurement colleagues
to reduce potential impact of supplier
charges.  Control food wastage/portion
controls.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Catering Purchases Increased supplier charges and higher than average inflation
on food costs.  In addition to this the Scottish Government
reviewed the regulations that govern the food and drinks
provided in schools and implemented revised regulations. 
The revised standards focus on reducing sugar, reducing red
processed meat and increasing fibre. Thus far, there has
been an increase in costs in produce and a reduction in
demand for school meals.
Joint strategy with procurement colleagues
to reduce potential impact of supplier
charges.  Control food wastage/portion
controls; introduction of online ordering to
help manage food waste. Analysis and
regular review of menu choices.
4 100 2 100
Executive Director
Douglas Hendry
Commercial Services Catering - Implementation of
Universal Free School Meals in
Primary Schools for P6 and P7
pupils
The Scottish Government may not give the local authority
adequate funds to support the policy to expand free school
meals in primary schools to include P6 and P7 pupils (the
scheme has already been implemented for P1 to P5 pupils).
Although expansion paused for full implementation for
P6&7, FSM expanded through entitlement to Scottish Child
Payment.
Senior Manager connected into the 
National Operational Delivery Group.  This
enables the Council's viewpoint to be
considered.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Rental Income from Properties Due to current economic climate there may be reduced
ability to recover rental income from leased properties or
place suitable tenants in properties as leases come to an
end.
Management of leasehold properties by
Estates team, any issues with debt recovery
being dealt with in line with Council debt
recovery policy.
2 60 2 60
Executive Director
Douglas Hendry
Commercial Services Surplus Properties Ongoing market difficulties lead to increased numbers of
surplus properties, in addition, as Our Modern Workspace
Project gains traction more properties will become surplus
to operational requirements.  There are residual running
costs associated with all surplus properties.
One Council property team in place who
will monitor market conditions and work
with prospective tenants/ purchasers to
let/sell surplus properties.
3 50 3 50
Executive Director
Douglas Hendry
Commercial Services Leisure Service Level
Agreements
Increase in RPI and/or other running costs (eg utilities,
payroll etc) resulting in requests for additional funding.
Monitoring annual alteration to contract
RPI rate, communication with service
providers and mitigation through financial
forecasting and review of existing budget.
3 50 3 50
As at February 2023
(Budget Setting) As at 30 June 2023
Page 66

Page 67

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2023
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at February 2023
(Budget Setting) As at 30 June 2023
Executive Director
Douglas Hendry
Council Wide - Commercial
Services
Council Wide Central Repairs Increased demands on central repair budgets (CRA) as a
result of a decrease in Capital funding, increase in statutory
and emergency repairs and increases in supplier/contractor
charges.  This impacts on all departments of the Council
with a Central Repairs Budget..
Joint strategy with procurement colleagues
to reduce potential impact of
supplier/contractor charges.  Close
monitoring of central repairs budgets and
commitments and instructing only
statutory tests/inspections and essential
repairs.
4 300 4 300
Executive Director
Douglas Hendry
Education ASN Support Demand for ASN support continues to increase, Scottish
Government statistics suggest a 3% year on year increase,
resulting in an additional resource requirement.  Particularly
where gaps in our enhanced provision exist. The medium
term detriments on the development of young children
which occurred as a consequence of service closures during
the COVID pandemic have increased demands on the service
as children require additional support to catch up.  The
Additional Support for Learning National Implementation
plan continues to inform our strategic direction in line with
the Angela Morgan Review.
Service is currently looking at alternative
options for service delivery to mitigate the
inescapable pressures.  Continuing to
ensure robust assessment of needs,
monthly monitoring of budget, any delays
in recruitment factored into projections to
enable informed decision making on
allocation of funding for new/amended
/additional support packages.
3 100 3 200
Executive Director
Douglas Hendry
Education Pre-Five Units - retention of
partner providers
Failure in the commissioning or retention of pre-five partner
provider units to deliver 1140 hours would result in an
increased pressure on the Council to deliver the service.
Annual financial appraisal; Support
network; Short-term cash injections.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Children and Young People
(Scotland) Act - ELC 1140 hours
The Council has been required to deliver 1140 hours of Early
Learning and Childcare since August 2021.  The Scottish
Government has committed to funding this and the Council
has revised its service model to align it to the Scottish
Government's reduced funding profile.  A risk remains that
actual costs of delivery exceed the Government Grant in any
given year.  For example, if child numbers are higher than
estimated, this may require additional staffing which has
not been built into the staffing model funded by Scottish
Government.
Continuous monitoring and review of the
service model, usage and resources.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Education (Scotland) Act
The Education (Scotland) Act 2000 requires Councils to carry
out assessments of the need for the provision of Gaelic
Medium Primary Education (GMPE) and the duty to support
and promote Gaelic Education. This may lead to additional
staffing requirements depending upon the demand for
Gaelic from parents.
Continuous monitoring and review of the
service model  and resources available
within budget.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Hub DBDA/DBFM Schools  -
Litigation
Increased risk of the requirement to litigate to conclude
final capital contract payments due.
Monitoring claims and mitigation through
robust challenge of any additional claims.
2 150 2 150
Page 67

Page 68

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2023
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at February 2023
(Budget Setting) As at 30 June 2023
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Contract RPI for NPDO and Hub
Schools
Increase in RPI would result in higher costs. Monitoring annual alteration to contract
RPI rate and mitigation through financial
forecasting and review of existing budget.
4 100 4 100
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO - Reduction in insurance
savings within NPDO Schools
Increase in insurance costs as a result of the long term
effects of Covid-19 on the insurance market and flood
claims.
Monitoring annual alteration to contract
insurance rate and mitigation through
financial forecasting and review of existing
budget.
3 75 3 75
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services - Litigation Increased number of litigation cases. Ensure Legal Services are gateway to access
all legal advice and that advice is sought at
earliest opportunity.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO/Hub DBFM contract
management efficiencies
Reduction in ability to generate contract management
efficiencies.
Monitoring annual efficiencies generated
and mitigation through robust contract
management and application of contract
specifications/requirements.
2 50 2 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Elections More than 1 by-election required outwith standard election
cycle.
Outwith direct management control. 3 45 3 45
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Licensing Reduced numbers of licensing applications leading to
reduced income.
Monitoring of trends and reporting the
financial impact in the budget monitoring.
4 30 4 30
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Children's Panel Increased number of referrals increasing costs through
increases in the running costs.
Maximise the use of council
facilities/resources for panel session in the
first instance.
1 10 1 10
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services Failure to minimise Council wide use of external legal
advice.
Ensure legal services are gateway to access
all legal advice.
1 10 1 10
Executive Director
Kirsty Flanagan
Customer Support Services Software Licences Potential risk of being under licensed for software which will
be identified via software audits which would incur
additional costs.
ICT security and compliance officer in post
and duties include review of systems to
ensure fully licenced. 
2 100 2 100
Executive Director
Kirsty Flanagan
Customer Support Services Additional Bandwidth for
Education
Additional costs required to be incurred in relation to
additional bandwidth required to deliver the Education
Digital Strategy due to a more digitalised learning
curriculum.
Work closely with Education on Digital
Devices for All strategy to ensure necessary
IT is in place.
3 50 3 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Environmental Health- export
certificates
Downturn in requests for export certificates as a result of
UK withdrawal from EU, changes to international trading
agreements or business economy. Reduction in demand
creates a budget pressure on environmental health budget.
Monitor income and resources required for
export health certificates / attestations
required to support the export market.
Continue with food safety regulation
activities associated and support at 3rd
country audits.  Pursue debt rigorously with
key customers through seeking regular
payments.
2 130 2 130
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Dangerous Buildings
interventions
Building Standards having to deal with an increasing level of
dangerous building work which has significant financial
implications for Council.
Monitor activity and seek to recover costs
from the owner.
3 100 3 100
Page 68

Page 69

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2023
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at February 2023
(Budget Setting) As at 30 June 2023
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fees reduced by
Scottish Government
Potential that the Scottish Government may reduce
planning fees due to poor performance by the Planning
Authority. The Scottish Government has recently appointed
a national Planning Performance Champion however the
detail of how this role intends to incentivise
improved/penalise poor performance at a local authority
level remains unclear at this time
Maintain high levels of performance as
articulated by performance markers
detailed in Planning Performance
Framework annual report.
1 100 1 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fee shortfalls Due to downturn in economic / building activity, in
particular renewable energy development and other major
developments could lead to planning fee income shortfalls
leading to revenue budget pressures.
Current income levels are looking more
positive, however, we are dependent on
some high value applications coming in
which if don't materialise, will impact the
overall position.  Will continue to monitor
Development Management income and
expenditure tightly and investigate further
income generation streams.
1 50 1 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Building Warrant fee shortfalls Due to loss of commercial income and downturn in
economic / building activity, building warrant fee income
shortfalls leading to revenue budget pressures.
Continue to monitor Building Standards
income and expenditure tightly and
investigate further income generation
streams. 
1 50 1 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Homelessness Temporary
Accommodation Income
Unpredictable number of Homeless applications. Inability to
recover rent.  Increase costs of property maintenance and
tenancy change over.
Provision of Housing Options information
and advice service to minimise number of
applicants proceeding to full homeless
application.  Implementation of Rapid
Rehousing Plan.
3 50 3 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Animal Health Carrying out livestock seizure to protect welfare of the
animals
Monitor activity and seek to recover costs
from the disposal of the animals.
1 10 1 10
Executive Director
Kirsty Flanagan
Financial Services Council Tax Debt Collection
Recovery
Recovery of debt becomes more difficult to pursue in the
current economic climate.  This is in relation to historical
debt that has accumulated over many years therefore any
adverse collection rates will impact on the year end debt
provision as opposed to the in-year financial position, hence
no forecast variance has been reported within the current
year.
Robust monitoring of arrangements with
debt collection agency and performance
against target collection rates.
3 345 3 345
Executive Director
Kirsty Flanagan
Financial Services Housing Benefit Subsidy Loss of Housing Benefit Subsidy due to exceeding LA error
threshold.
Processes in place for handling of claims
accurately and efficiently.
1 125 1 125
Executive Director
Kirsty Flanagan
Financial Services Sundry Debt Recovery Recovery of debt becomes more difficult to pursue in the
current economic climate. 
Additional staff are being put in place in the
Sundry Debt Team who will work jointly
with Legal Services to enhance the
robustness of the Council's debt recovery
processes.
3 85 3 85
Page 69

Page 70

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2023
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
As at February 2023
(Budget Setting) As at 30 June 2023
Executive Director
Kirsty Flanagan
Financial Services Non-Domestic Rates Relief Risk of demand changing due to legislative changes outwith
our control for charitable relief for Arms Length External
Organisations (ALEO).
Outwith direct management control. 3 30 3 30
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Roads Maintenance - Bridges,
Culverts & Sea Defences
Extreme localised weather may result in loss of bridge,
culvert, road or sea defence.
Routine inspections to deal with potential
weak areas - based on a stitch in time
repair regime.
3 750 3 750
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Winter Maintenance Adverse weather conditions which require greater than
budgeted number of gritting runs.
Monitor weather conditions and apply
gritting policy to minimise costs.
3 365 3 365
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Roads Maintenance - Roads
Network
Adverse weather conditions result in deterioration of the
road network necessitating greater spend on repair of
defects.
Manage maintenance budgets to ensure
that spend is prioritised to deal with safety
defects.
3 230 3 230
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Car Parking Income Reduced number of visitors to the area and use of council
owned car parks resulting in a reduction in income.
Closely monitor income levels throughout
the year, especially in high visitor seasons.
3 200
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Ferry Services - income Changes to ferry services resulting in reduced berthing and
passenger income.
Closely monitor passenger number
information coming from CalMac to
identify any emerging trends with reducing
passenger numbers.
3 200 3 200
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Street Lighting Age of lighting stock requires greater maintenance as health
and safety becomes a consideration.
Manage maintenance budgets to ensure
that spend is prioritised to deal with safety
defects.
4 100 4 100
38 4,500 39 4,800
Page 70

Page 71

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE  
FINANCIAL SERVICES 10 AUGUST 2023 
CAPITAL BUDGET MONITORING REPORT – 30 JUNE 2023 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides an update on the position of the capital budget as at 30
June 2023. The report provides information on the financial position in respect of
the capital plan and the performance in terms of delivery of capital plan projects. 
1.2  Financial Position: 
 Current Year to Date – actual net expenditure to date is £6,965k
compared to a budget for the year to date of £6,985k giving rise to an
underspend for the year to date of £20k (0.29%).
 Forecast Outturn for 2023-24 – forecast net expenditure for the full
financial year is £44,660k compared to an annual budget of £44,976k
giving rise to a forecast underspend for the year of £316k (0.70%).    
 Total Capital Plan – forecast total net project costs on the total capital
plan are £213,649k compared to a total budget for all projects of
£213,599k giving rise to a forecast overspend for the overall capital plan
of £50k (0.02%). 
1.3 Project Delivery: 
 Asset Sustainability – Out of 83 projects there are 83 projects (100%) on
track, 0 projects (0%) off track but recoverable and 0 projects off track
(0%).
 Service Development - Out of 42 projects there are 40 projects (95%) on
track, 1 project (2.5%) off track but recoverable and 1 project (2.5%) off
track.
 Strategic Change – Out of 30 projects there are 30 projects (100%) on
track, 0 projects (0%) are off track but recoverable and 0 projects (0%) off
track.  
1.4 
1.5 
The Capital Programme is funded by various income streams as detailed in
Appendix 5. Additional funding allocated since the last report has come from
SPT & Rural Growth Deal. 
Capital receipts of £160,000 have been received so far in 2023-24. The
estimated level of receipts will be kept under review as market conditions
change, as will values following due diligence undertaken by prospective
purchasers on the condition of asset. 
Page 71

Page 72

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 10 AUGUST 2023
CAPITAL BUDGET MONITORING REPORT – 30 JUNE 2023
2.0
2.1
2.2
2.3
2.4
2.5
INTRODUCTION
This report provides an update on the position of the capital budget as at 30 June
2023. The report provides information on the financial position in respect of the
capital plan and the performance in terms of delivery of capital plan projects. 
Following the decision at Policy and Resources Committee on 9 December 2021,
the Rothesay Pavilion project was put on pause whilst potential funding options
were being considered. At the budget meeting in February 2023 additional funding
was allocated to this project which will allow the project to progress towards
success by supporting completion of certain work stages. The financial information
included within this report now includes historical spend plus amounts relating to
Stage 1 of the Rothesay Pavilion project. There is also a further report later in the
Policy & Resources Committee agenda relating to this project.
A £1m cost pressure was identified during 2021-22 in relation to repairs to the
A884 Ardbeg Sea Wall, where severe storm damage resulted in failure of the sea
wall on Bute. Emergency works were carried out and a permanent solution is
currently being developed. Additional funding of £1m was allocated for this
purpose at the Council meeting on 24 February 2022 however there remains a risk
that costs will exceed this. 
The impact of the pandemic along with the UK exit from the European Union, the
Russian invasion of Ukraine and sanctions on Russian owned entities has seen
significant price increases as well as disruptions to the supply chain and longer
lead in times. The increased rate of inflation impacts costs such as energy prices,
labour, packaging and transport. These all have an effect on the overall contract
price and make it extremely challenging to manage expenditure and the availability
of supply.
As a result of this it should be noted that there are likely to be other significant
financial impacts which are not quantifiable at this stage, as follows: 
 Rothesay Pavilion – despite additional funding being awarded there
remains a funding gap to allow full completion of the original intended
works.
 Harbour Investment Programme – likely to be contractual cost increases in
future years (expected to be funded from increased fees and charges).
 Universal Free School Meals – delayed roll out to P6 and P7 and uncertain
capital funding levels available from the Scottish Government. Distributions
of 2023-24 funding have not yet been announced.
 Other general construction inflationary increases.
Although the direct impact of COVID on most local services has reduced or even
ceased altogether over the last 12 months, COVID-19 in conjunction with the UK
exit from the European Union and the Russian invasion of Ukraine, continues to
affect worldwide supply chains. 
Page 72

Page 73

4.0 CURRENT YEAR TO DATE FINANCIAL POSITION 
4.1 
4.2
Overall Position 
Actual net expenditure to date is £6,965k compared to a budget for the year to
date of £6,985k giving rise to an underspend for the year to date of £20k (0.29%). 
Project/Department Position 
The table below shows the year to date net expenditure against the year to date
budget by project type and service: 
Project Type: Year to
Date
Budget    
£'000
Year to
Date
Actual    
£'000
Variance       
£'000
Asset Sustainability 1,465 1,467 (2)
Service Development 1,354 1,327 27
Strategic Change 4,166 4,171 (5)
Total  6,985 6,965 20
Service:   
ICT 253 253 0
Education 435 435 0
Live Argyll 295 295 0
Health & Social Care Partnership 188 188 0
Shared Offices 116 118 (2)
Roads & Infrastructure 4,748 4,721 27
Development & Economic Growth 452 452 0
CHORD 498 503 (5)
Total 6,985 6,965 20 
Material variances are explained in Appendix 1 and there are a number of small
variances contributing to the year to date overspend. 
In recent years additional funding of £10.803m has been allocated to the capital
programme for this purpose which has mitigated the impact to date however, as
detailed in the table below, only £2.703m remains unallocated to projects facing
inflationary pressures. 
Funding for Capital Inflationary Pressures £m
COVID-19 Funding 0.257
February 2021 Budget Meeting - Capital Cost Pressures 4.646
February 2022 Budget Meeting - Capital Cost Pressures 3.900
February 2023 Budget Meeting – Capital Projects Inflation Pressures 2.000
Total Additional Funding Allocated to Capital 10.803
Allocated to Projects within Capital Programme (5.779)
Committed for future years (2.321)
Balance Remaining 2.703 
3.0 RECOMMENDATIONS 
3.1 Note the contents of this report and the financial summaries as detailed in
Appendix 8 and approve the proposed changes to the capital plan detailed in
Appendix 4.
Page 73

Page 74

5.0  FORECAST OUTTURN 2023-24 
5.1  Overall Position 
Forecast net expenditure for the full financial year is £44,660k compared to an annual
budget of £44,976k giving rise to a forecast underspend for the year of £316k (0.70%). 
5.2 Project/Department Position 
The table below shows the forecast expenditure and budget for the year by project
type and service. 
Project Type:
Annual
Budget            
£'000
Forecast
Outturn        
£'000 
Forecast
Variance         
£'000
Asset Sustainability 26,198 26,200 (2)
Service Development 224 272 (48)
Strategic Change 18,554 18,188 366
Total  44,976 44,660 316
Service:      
ICT 1,091 1,091 0
Education 7,814 7,814 0
Live Argyll 1,291 1,291 0
Health & Social Care Partnership 2,201 2,201 0
Shared Offices 2,270 1,906 364
Roads & Infrastructure 24,904 24,942 (38)
Development & Economic Growth (941) (931) (10)
CHORD 6,346 6,346 0
Total 44,976 44,660 316 
Material variances are explained in Appendix 2 and there are a number of smaller
variances contributing to the forecast underspend. 
Page 74

Page 75

6.0  TOTAL PROJECT COSTS 
6.1 Overall Position 
Forecast total net project costs on the total capital plan are £213,649k compared to
a total budget for all projects of £213,599k giving rise to a forecast overspend for
the overall capital plan of £50k (0.02%). 
6.2  Project/Department Position 
The table below shows the forecast expenditure and budget for the total capital
plan by project type and service. 
Project Type:
Capital
Plan
Budget         
£'000
Forecast
Project
Costs        
£'000 
Total
Capital
Plan
Variance         
£'000
Asset Sustainability 58,330 58,332 (2)
Service Development 22,147 22,195 (48)
Strategic Change 133,122 133,122 0
Total  213,599 213,649 (50)
Service:      
ICT 5,360 5,360 0
Education 45,630 45,630 0
Live Argyll 2,893 2,893 0
Health & Social Care Partnership 4,752 4,752 0
Shared Offices 22,953 22,955 (2)
Roads & Infrastructure 59,078 59,116 (38)
Development & Economic Growth 4,734 4,744 (10)
CHORD 68,199 68,199 0
Total 213,599 213,649 (50) 
Material variances are explained in Appendix 3 and there are a number of
smaller variances leading to the forecast overspend. 
Page 75

Page 76

7.0  TOTAL PROJECT PERFORMANCE 
7.1 Overall Position 
There are 155 projects within the Capital Plan, 153 are Complete or On Target, 1 is
Off Target and Recoverable and 1 is Off Track.
7.2  Project Position 
The table below shows the Performance Status of the Projects in the Capital Plan. 
Project Type: Complete/
On Target
Off Target/
Recoverable
Off
Target/
Problem
Total
Asset Sustainability 83 0 0 83
Service Development 40 1 1 42
Strategic Change 30 0 0 30
Total 153 1 1 155
Service:    
ICT 7 0 0 7
Education 31 0 0 31
Live Argyll 18 0 0 18
Health & Social Care
Partnership
17 0 0 17
Shared Offices 24 0 0 24
Roads & Infrastructure 34 0 1 35
Development & Economic
Growth
16 1 0 17
CHORD 6 0 0 6
Total 153 1 1 155 
Page 76

Page 77

7.3  Chart of Performance Status 
The graph provides a view of the Performance Status of the Projects included in
the Capital Plan: 
Page 77

Page 78

8.0 OFF TRACK PROJECTS 
8.1 
9.0 
9.1 
The Off-Track projects are noted in the table below and variance reports are
included in Appendix 6. 
Project Type Project What is Off
Track?
Explanation
Asset
Sustainability
Oban Depot
Development Project 
Total Project
expenditure
Projects overspends
are to be funded from
revenue and Scottish
Government Grant
funding. Actions are
planned to identify
and allocate funding
for these costs. 
STRATEGIC CHANGE PROJECTS 
Appendix 7 gives detailed information in respect of the Strategic Change
Projects within the Capital Plan. The appendix gives details of the forecast cost
of each project against the approved budget, the start and anticipated
completion date of the project and an assessment of the risks of the project and,
if these are not green, gives an explanation of the problem.   
Page 78

Page 79

10.0 
10.1 
CHANGES TO CAPITAL PLAN 
The table below shows proposed changes to the Capital Plan at summary level
which include slippages, accelerations and virements. Explanations relating to
the specific projects involved can be seen in Appendix 4. 
The updated capital plan incorporating these proposed changes can be found in
Appendix 9. 
Department
Prev.
Agreed
Changes 
2023-24
2023-
24
2024-
25
2025-
26
Future
Years
Total
Capital
Plan
£’000 £’000 £’000 £’000 £’000 £’000
Asset
Sustainability 0 0 0 0 0 0
Service
Development 0 0 0 0 0 0
Strategic Change 0 (366) 366 0 0 0
Total 0 (366) 366 0 0 0              
Service:            
ICT 0 0 0 0 0 0
Education 0 0 0 0 0 0
Live Argyll 0 0 0 0 0 0
Health & Social
Care Partnership 0 0 0 0 0 0
Shared Offices 0 (366) 366 0 0 0
Roads &
Infrastructure 0 0 0 0 0 0
Development &
Economic Growth 0 0 0 0 0 0
Major Projects 0 0 0 0 0 0
Total 0 (366) 366 0 0 0 
11.0          FUNDING 
11.1  The Capital Programme is funded by various income streams as detailed in
Appendix 5. £315k of funding has been received from SPT for Helensburgh and
Rosneath Cycleway and Bus Infrastructure, £132k for Rural Growth Deal initial
funding and Dunoon STEM Hub has received £1,750k from the Rural Growth
Deal.
Page 79

Page 80

11.2 
12.0 
12.1 
12.2 
12.3 
12.4 
12.5 
12.6 
12.7 
12.8 
Capital receipts of £160,000 have been received so far in 2023-24. The
estimated level of receipts will be kept under review as market conditions
change, as will values following due diligence undertaken by prospective
purchasers on the condition of assets. 
IMPLICATIONS 
Policy – Monitors progress against the capital plan. 
Financial – Monitors funding and commitments of the capital plan. 
Legal – Available funding may not address all Statutory and Regulatory
requirements in relation to Health and Safety. 
HR – Available funding may have an impact on the sustainability of the Property
Design Team and Infrastructure Design Team. 
Fairer Scotland Duty – None. 
12.5.1     Equalities – protected characteristics – None. 
12.5.2     Socio-economic Duty – None. 
12.5.3     Islands – None. 
Climate Change – The Council is committed to addressing climate change via
projects within the capital plan. 
Risk – There are risks around increasing capital contract costs and the level and
timing of capital receipts. 
Customer Service – None. 
Kirsty Flanagan 
Executive Director / Section 95 Officer 
Policy Lead for Finance and Commercial Services – Councillor Gary
Mulvaney 
APPENDICES
- Appendix 1 – Year To Date finance variance explanations
- Appendix 2 – Forecast Outturn variance explanations
- Appendix 3 – Total Project finance variance explanations
- Appendix 4 – Changes to Capital Plan and Financial Impact
- Appendix 5 – Capital Funding
- Appendix 6 - Off Track project variance reports
- Appendix 7 - Cumulative spend, completion dates and risks relating                         
to significant capital projects. 
- Appendix 8 - Financial Summary – Overall
- Financial Summary – Executive Director Kirsty Flanagan
- Financial Summary – Executive Director Douglas Hendry
- Appendix 9 - Updated/Revised Capital Plan
For further information contact: Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 80

Page 81

APPENDIX 1 – Year to Date Financial Variance Explanations
Listed below are the projects where the variance is +/- £50k.
Project
YTD
Budget
£’000
YTD
Actual
£’000
(Over)/
Under
Variance       
£’000
Explanation
Other variances under £50k             25 Total value of non-material variances less than +/-£50k
Total   25 
Page 81

Page 82

APPENDIX 2 – Outturn Variance Explanations
Listed below are the projects where the current year variance is +/- £50k. 
Project 
Annual
Budget
£’000
Outturn
£’000 
(Over)/ Under
Forecast
Variance
COVID-19
Related         
£’000
(Over)/ Under
Forecast
Variance Non
COVID-19
Related         
£’000
Total
(Over)/
Under
Forecast
Variance         
£’000
Explanation
Net Zero  366 0  0 366 366
See appendix 4: virements of numerous
historic excess budgets that have been
combined to allow for Net Zero capital works
to be carried out. Slipped after virement to
allow time for a plan to be developed for this
project.
Other variances under £50k                 0 (50) (50) Total value of non-material variances less than +/-
£50k.
Total  0 316 316 
Page 82

Page 83

APPENDIX 3 – Total Project Finance Variances
Listed below are the projects where the total project variance is +/- £50k. 
Project 
Capital
Plan
Budget
£’000
Forecast
Project
Costs
£’000 
(Over)/ Under
Forecast
Variance
COVID-19
Related         
£’000
(Over)/ Under
Forecast
Variance Non
COVID-19
Related         
£’000
Total (Over)/
Under
Forecast
Variance         
£’000
Explanation
Oban Depot Development  2,117 2,182   (65) (65)
Projects overspends are to be funded from revenue
and Scottish Government Grant for EVC. Actions are
planned to identify and allocate funding for these
costs.
Other variances under £50k             15 15
Total value of non-material variances less than +/-
£50k. Project Managers are working to reduce these
small individual overspends by identifying
underspends elsewhere within the capital plan.
Total  (50) (50) 
Page 83

Page 84

APPENDIX 4 – Changes to Capital Plan and Financial Impact
OVERALL COST CHANGES
Project
2023-
24
£’000
2024-
25
£’000
2025-
26
£’000
Future
Years
£’000
Total
Capital Plan
£’000
Recommendation Explanation
Carbon Management
Business Cases (FPB) (60)     Vire into Net Zero project Excess historic budget, vired to one project line
for Net Zero related capital works.
NPDO Schools Solar PV
Panel Installations (183)     Vire into Net Zero project Excess historic budget, vired to one project line
for Net Zero related capital works.
Non-NPDO Schools PV Panel
Installations (88)     Vire into Net Zero project Excess historic budget, vired to one project line
for Net Zero related capital works.
Carbon Management
Capital Property Works
16/17
(20)     Vire into Net Zero project Excess historic budget, vired to one project line
for Net Zero related capital works.
Carbon Management -
Group Heating Conversion
Project (PB)
(10)     Vire into Net Zero project Excess historic budget, vired to one project line
for Net Zero related capital works.
Oil to Gas Heating
Conversions (FPB) (5)     Vire into Net Zero project Excess historic budget, vired to one project line
for Net Zero related capital works.
Net Zero Project  366    Vired from above Shared Office
projects.
Create one project line to bring together any
additional budgets from previous projects to fund
capital Net Zero related works.
Clyde Cottage – 600 hours
provision  (23)     Vired into Early Learning and
Childcare - 1140 Hours
Excess budget vired into the active Early Learning
and Childcare project.
Early Learning and Childcare
- 1140 Hours 23     Vired from Clyde Cottage – 600
hours provision See above.
Total Cost Changes (366) 366 0 0 0   
SLIPPAGES AND ACCELERATIONS
Project
2023-
24
£’000
2024-
25
£’000
2025-26
£’000
Future
Years
£’000 
2023-24
Slippage
Related to
COVID-19
£’000
2023-24
Slippage
Related
to Non
COVID-
19
£’000
Total
2023-24 
£’000
Recommendation Explanation
Total Slippages and
Accelerations 0 0 0 0  0 0 0  
Net Impact of Changes (366) 366 0 0  0 0 0   
Page 84

Page 85

CAPITAL PROGRAMME FUNDING Appendix 5
Estimated
Capital
Funding
Carry
Forwards
from 22-23
Slippage /
Acceleration Additional Funding
Updated
Capital
Funding
Available
Estimated
Capital
Funding
Carry
Forwards
from 22-23
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
Estimated
Capital
Funding
Carry
Forwards
from 22-23
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
General Capital Grant 11,900 0 0 0 11,900 9,851 0 0 0 9,851 10,007 0 0 0 10,007
Transfer to Revenue for Private Sector Housing Grant (PSHG) -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033
Capital Receipts 1,195 0 0 0 1,195 350 0 0 0 350 400 0 0 0 400
Flooding Allocation 155 0 0 0 155 155 0 0 0 155 155 0 0 0 155
Ring Fenced Capital Grant 5,800 0 0 0 5,800 304 0 0 400 704 0 0 0 0 0
Restricted Funding 1,613 0 0 427 2,040 0 0 366 2,065 2,431 0 0 0 50 50
Funded by Reserves 11,821 9,005 0 148 20,974 9,196 0 0 0 9,196 896 0 0 0 896
Additional Funding from Revenue 25 0 0 50 75 0 0 0 0 0 0 0 0 0 0
Insurance 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Harbour Investment Programme 22,235 -13,035 0 0 9,200 27,025 -5,025 0 0 22,000 29,700 20,300 0 0 50,000
Prudential Borrowing 20,718 -6,345 -366 74 14,081 27 6,434 0 0 6,461 0 1,388 0 0 1,388
Loans Fund Review 0 131 0 0 131 0 0 0 0 0 0 0 0 0 0
COVID Funding 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
74,429 -10,244 -366 699 64,518 45,875 1,409 366 2,465 50,115 40,125 21,688 0 50 61,863
BREAKDOWN OF ADDITIONAL FUNDING
Additional Funding 2023-24 2024-25 2025-26 Source Reported
Tobermory Top Flat - SHF 30 Revenue Funding Jan-23
Dunoon STEM Hub 50 Revenue Funding Jan-23
Dunoon STEM Hub 150 Grant Funding Jan-23
Dunoon Cycle Bothy 145 Grant Funding Jan-23
Gartbreck - Capping 118 Reserves Mar-23
Dunoon Cycle Bothy 74 Scottish Government Mar-23
Tigh Na Rhuda 400 50 Scottish Government Mar-23
Helensburgh and Rosneath Cycleways 290 SPT Jun-23
SPT - Bus Infrastructure 25 SPT Jun-23
Dunoon STEM Hub 1,750 Rural Growth Deal Jun-23
Rural Growth Deal planning stages 132 Rural Growth Deal Jun-23
Total 699 2,465 50
2025-262024-252023-24
Page 85

Page 86

OFF TRACK PROJECT  Appendix 6
Project Name:  Oban Depot Development Project Project Manager: Mark Calder   Risk: Low
Initial Start Date:  August 2019 Proposed End Date:  TBC 
How was this project initially funded?  
Insurance Claim - £1.681 million 
Please detail any additional funding.  
Prudential Borrowing - £0.42 million
Block Allocation - £0.032 million
Capital Receipt (Appin Depot – anticipated) £0.150 million
Previously Reported Committee and Date:    Next Reported Committee and Date: 
Why is the project classified as off target?
Reporting an overspend against approved budget. 
What has caused the issue outlined above?  
Additional works were requested by the operations team which exceeded the original building refurbishment contract. These works were agreed on the basis
that they would be absorbed by the service.  As the budget currently sits in revenue with the costs being capital, budget will be transferred over from revenue to
fund this overspend.
Some costs are attributed to Electric Vehicle charger installations which will be claimed against Scottish Government Grant Funding.
What action will be taken to rectify this issue?
Funding for the additional works will be transferred from the service’s revenue budget to the Oban Depot Development Project for the additional works,
as agreed.
What are the implications of the action proposed?
Transfer of funding from the service to the Oban Depot Development Project for the additional works requested will eliminate the overspend. 
Page 86

Page 87

Strategic Change Projects - Cumulative Spend, Start/Finish Dates and Project Risks APPENDIX 7
Strategic Change Projects
Prior Years
Spend
£'000
Current Year
Forecast
£'000
Total Project
Forecast
£'000
Total Project
Budget
£'000
Project Start
Date
Estimated
Completion
Date
Project
Risks
Identified Explanation
Helensburgh Waterfront Development 23,415 977 24,392 24,392 01/04/2017 31/03/2024 Green Physically complete, retentions outstanding
Campbeltown Flood Scheme 4,992 9,860 15,215 15,215 01/08/2016 31/03/2024 Green Contractor's updated programming of work moved Public Utility works from 22/23 to 23/24
CHORD Oban 7,279 626 7,905 7,905 27/10/2016 31/03/2022 Green Issues with contract close out impacting on timescales.
TIF - Halfway House Roundabout 66 574 640 640 tbc tbc Green Scope of project still to be determined - budget to be reprofiled.
CHORD Rothesay 15,231 11,487 26,718 26,718 tbc tbc Green Project recommenced.
Harbour Investment Programme 9,200 9,200 91,292 91,292 01/04/2017 31/03/2028 Green Budget slipped into future years.
Dunoon Primary 10,635 234 10,869 10,869 18/12/2014 30/04/2020 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Kirn Primary School 10,085 34 10,119 10,119 24/04/2014 31/10/2017 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Replacement of Oban High 2,844 406 3,250 3,250 24/04/2014 31/01/2019 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Street Lighting LED Replacement 3,226 674 3,900 3,900 01/08/2016 31/12/2022 Green Tender for final package of works still to be awarded.
Helensburgh Office Rationalisation 11,538 300 11,838 11,838 25/04/2013 31/12/2022 Green Project subject to legal dispute.
CHORD Dunoon 12,495 27 12,522 12,522 03/02/2012 09/03/2018 Green
Main contract complete and retentions paid. Landscaping and remediation works ongoing but
issues with water ingress may require works in 22-23.
Kilmory Business Park Phase 2AA 47 1,082 1,129 1,129 01/02/2022 01/09/2023 Green Development Agreement still to be concluded.
Carbon Management Business Cases 201 0 201 261 01/02/2014 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Carbon Management - Group Heating Conversion Project 1,938 0 1,938 1,948 01/02/2016 31/12/2022 Green Complete.
Carbon Management - Non Education 29 21 50 50 01/04/2015 31/12/2022 Green Projects being determined.
NPDO Schools Solar PV Panel Installations 761 0 761 944 26/06/2014 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Non NPDO Schools Solar PV Panel Installations 400 0 400 488 20/03/2014 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Carbon Management Capital Property Works 2016/17 19 0 19 39 01/02/2016 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Oil to Gas Heating Conversions 182 0 182 187 01/02/2012 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Dunoon Pier OBC 2,844 0 2,844 2,844 03/02/2012 26/02/2016 Green Project complete.
Campbeltown Office Rationalisation 595 1 596 596 01/02/2015 31/03/2019 Green Complete.
TIF - Oban Airport Business Park 489 101 590 590 22/01/2015 31/12/2022 Green
Campbeltown Schools Redevelopment 2,092 38 2,130 2,130 16/02/2012 30/11/2018 Green Physically complete - negotiations with contractor delaying payment of financial sums outstanding.
CHORD - Helensburgh 6,529 28 6,557 6,557 29/09/2011 30/04/2015 Green Main contract complete. Art project proposed for 23-24.
TIF - North Pier Extension 214 0 214 214 06/12/2017 06/12/2021 Green Complete.
TIF - Lorn/Kirk Road 2,169 1 2,170 2,170 22/01/2015 31/03/2021 Green Complete.
Carbon Management Fuel Conversions 107 0 107 107 01/02/2014 31/03/2019 Green Complete.
Kilmory Biomass  Carbon Management 956 0 956 956 20/09/2012 31/03/2019 Green Complete.
Clean Energy - NDEEF1 328 224 745 745 tbc 31/03/2024 Green
Clean Energy - NDEEF2 0 50 1,140 1,140 tbc tbc Green
Strategic Change Total 130,906 35,945 241,389 241,755
Project Risk Classifications:
Green - Risks can be managed and are viewed as stable or reducing.
Amber - Risks are increasing but are still manageable.
Red - Risks are increasing or have increased to such an extent they may affect delivery of the project.
Capital Expenditure Dates Risks
Page 87

Page 88

ARGYLL AND BUTE COUNCIL - CAPITAL PLAN MONITORING REPORT - OVERALL COUNCIL Appendix 8
FINANCIAL SUMMARY - NET EXPENDITURE
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Executive Director Douglas Hendry 896 898 (2) 11,505 11,507 (2) 22,959 22,961 (2)
Executive Director Kirsty Flanagan 596 596 0 15,331 15,331 0 36,459 36,459 0
Asset Sustainability Total 1,492 1,494 (2) 26,836 26,838 (2) 59,418 59,420 (2)
Service Development Projects
Executive Director Douglas Hendry 136 136 0 525 525 0 16,437 16,437 0
Executive Director Kirsty Flanagan 1,003 1,003 0 5,794 5,869 (75) 37,737 37,812 (75)
Service Development Total 1,139 1,139 0 6,319 6,394 (75) 54,174 54,249 (75)
Strategic Change Projects
Campbeltown Schools Redevelopment 0 0 0 38 38 0 2,130 2,130 0
Dunoon Primary 2 2 0 234 234 0 10,869 10,869 0
Replacement of Oban High 0 0 0 406 406 0 3,250 3,250 0
Kirn Primary School 0 0 0 34 34 0 10,119 10,119 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Carbon Management Business Cases 0 0 0 60 0 60 261 201 60
NPDO Schools Solar PV Panel Installations 0 0 0 183 0 183 944 761 183
Non NPDO Schools Solar PV Panel Installations 0 0 0 88 0 88 488 400 88
Carbon Management Fuel Conversions 0 0 0 0 0 0 107 107 0
Carbon Management Capital Property Works 2016/17 0 0 0 20 0 20 39 19 20
Carbon Management - Group Heating Conversion Project 0 0 0 10 0 10 1,948 1,938 10
Kilmory Biomass  Carbon Management 0 0 0 0 0 0 956 956 0
Oil to Gas Heating Conversions 0 0 0 5 0 5 187 182 5
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 0 0 0 300 300 0 11,838 11,838 0
Clean Energy - NDEEF2 0 0 0 50 50 0 1,140 1,140 0
Net Zero 0 0 0 0 0 0 0 366 (366)
Campbeltown Flood Scheme 3,664 3,664 0 9,860 9,860 0 15,215 15,215 0
Street Lighting LED Replacement 1 1 0 674 674 0 3,900 3,900 0
Harbour Investment Programme 148 148 0 9,200 9,200 0 91,292 91,292 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - North Pier Extension 0 0 0 0 0 0 214 214 0
TIF - Oban Airport Business Park 1 1 0 101 101 0 590 590 0
TIF - Halfway House Roundabout 0 0 0 574 574 0 640 640 0
CHORD - Helensburgh 0 0 0 28 28 0 6,557 6,557 0
CHORD Dunoon 0 0 0 27 27 0 12,522 12,522 0
CHORD Oban 0 0 0 626 626 0 7,905 7,905 0
CHORD Rothesay 489 494 (5) 6,871 6,871 0 24,012 24,012 0
Helensburgh Waterfront Development 9 9 0 977 977 0 24,392 24,392 0
HWD - FFE (Funded by LA) 0 0 0 34 34 0 350 350 0
Kilmory Business Park Phase 2AA 0 0 0 1,082 1,082 0 1,129 1,129 0
Dunoon Pier OBC 0 0 0 0 0 0 2,844 2,844 0
Strategic Change Total 4,314 4,319 (5) 31,729 31,363 366 239,399 239,399 0
Total Expenditure 6,945 6,952 (7) 64,884 64,595 289 352,991 353,068 (77)
INCOME
Asset Sustainability
Executive Director Douglas Hendry 0 0 0 (128) (128) 0 (578) (578) 0
Executive Director Kirsty Flanagan (27) (27) 0 (510) (510) 0 (510) (510) 0
Asset Sustainability Total (27) (27) 0 (638) (638) 0 (1,088) (1,088) 0
Service Development Projects
Executive Director Douglas Hendry 0 0 0 0 0 0 (7,771) (7,771) 0
Executive Director Kirsty Flanagan 215 188 27 (6,095) (6,122) 27 (24,256) (24,283) 27
Service Development Total 215 188 27 (6,095) (6,122) 27 (32,027) (32,054) 27
Strategic Change Projects
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary 0 0 0 0 0 0 (137) (137) 0
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (148) (148) 0 (9,200) (9,200) 0 (91,292) (91,292) 0
01 TIF - Lorn/Kirk Road 0 0 0 (676) (676) 0 (2,717) (2,717) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (2,320) (2,320) 0 (7,979) (7,979) 0
Kilmory Business Park Phase 2AA 0 0 0 (979) (979) 0 (979) (979) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Strategic Change Total (148) (148) 0 (13,175) (13,175) 0 (106,277) (106,277) 0
Total Income 40 13 27 (19,908) (19,935) 27 (139,392) (139,419) 27
Net Total 6,985 6,965 20 44,976 44,660 316 213,599 213,649 (50)
Full Year This Financial Year Total Project Costs
30 June 2023
Page 88

Page 89

MONITORING REPORT
Budget Actual Variance Budget Forecast Variance Budget Forecast Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability
Education 297 297 0 6,756 6,756 0 13,403 13,403 0
Live Argyll 295 295 0 1,270 1,270 0 2,048 2,048 0
Health and Social Care Partnership 188 188 0 2,147 2,147 0 3,452 3,452 0
Shared Offices 116 118 (2) 1,332 1,334 (2) 4,056 4,058 (2)
Asset Sustainability Total 896 898 (2) 11,505 11,507 (2) 22,959 22,961 (2)
Service Development Projects
Ardrishaig Primary Pre 5 Unit 0 0 0 0 0 0 2 2 0
Bowmore Primary School - Pre 5 Unit 0 0 0 0 0 0 149 149 0
Clyde Cottage - 600 hour provision 0 0 0 23 0 23 579 556 23
Craignish Primary School - Pre 5 Extension 0 0 0 0 0 0 400 400 0
Iona Primary School - Pre 5 Unit 0 0 0 0 0 0 490 490 0
Islay High and Rosneath Primary School Pitches 0 0 0 0 0 0 719 719 0
Lochgoilhead Primary School - Pre 5 Unit 0 0 0 0 0 0 391 391 0
Park Primary Extension/Pre Fives Unit 0 0 0 0 0 0 341 341 0
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 491 491 0
Bunessan Primary School - Gaelic Medium Improvements 0 0 0 0 0 0 120 120 0
Early Learning and Childcare 0 0 0 0 0 0 850 850 0
Early Learning and Childcare - 1140 Hours 136 136 0 297 320 (23) 7,751 7,774 (23)
CO2 Monitoring - Covid Mitigation in Schools 0 0 0 113 113 0 192 192 0
Early Learning and Childcare - 1140 Hours - CFCR 0 0 0 0 0 0 1,379 1,379 0
Riverside Leisure Centre Refurbishment 0 0 0 0 0 0 1,245 1,245 0
Dunclutha Childrens Home 0 0 0 54 54 0 1,300 1,300 0
Service Development Total 136 136 0 525 525 0 16,437 16,437 0
Strategic Change Projects
Campbeltown Schools Redevelopment 0 0 0 38 38 0 2,130 2,130 0
Dunoon Primary 2 2 0 234 234 0 10,869 10,869 0
NPDO Schools Solar PV Panel Installations 0 0 0 183 0 183 944 761 183
Non NPDO Schools Solar PV Panel Installations 0 0 0 88 0 88 488 400 88
Carbon Management Fuel Conversions 0 0 0 0 0 0 107 107 0
Carbon Management Capital Property Works 2016/17 0 0 0 20 0 20 39 19 20
Carbon Management - Group Heating Conversion Project 0 0 0 10 0 10 1,948 1,938 10
Kilmory Biomass  Carbon Management 0 0 0 0 0 0 956 956 0
Oil to Gas Heating Conversions 0 0 0 5 0 5 187 182 5
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 0 0 0 300 300 0 11,838 11,838 0
Clean Energy - NDEEF1 0 0 0 224 224 0 745 745 0
Clean Energy - NDEEF2 0 0 0 50 50 0 1,140 1,140 0
Net Zero 0 0 0 0 0 0 0 366 (366)
CHORD Oban 0 0 0 626 626 0 7,905 7,905 0
CHORD Rothesay 489 494 (5) 6,871 6,871 0 24,012 24,012 0
CHORD - Helensburgh 0 0 0 28 28 0 6,557 6,557 0
CHORD Dunoon 0 0 0 27 27 0 12,522 12,522 0
Helensburgh Waterfront Deveopment 9 9 0 977 977 0 24,392 24,392 0
HWD - FFE (Funded by LA) 0 0 0 34 34 0 350 350 0
Kilmory Business Park Phase 2AA 0 0 0 1,082 1,082 0 1,129 1,129 0
Dunoon Pier OBC 0 0 0 0 0 0 2,844 2,844 0
Strategic Change Total 500 505 (5) 11,319 10,953 366 125,378 125,378 0
Total Expenditure 1,532 1,539 (7) 23,349 22,985 364 164,774 164,776 (2)
INCOME
Asset Sustainability
Education 0 0 0 (125) (125) 0 (125) (125) 0
Shared Offices 0 0 0 (3) (3) 0 (3) (3) 0
Asset Sustainability Total 0 0 0 (128) (128) 0 (578) (578) 0
Service Development Projects
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 (485) (485) 0
Bunessan Primary School - Gaelic Medium Improvements 0 0 0 0 0 0 (30) (30) 0
Early Learning and Childcare 0 0 0 0 0 0 (918) (918) 0
Early Years 1140 Hours 0 0 0 0 0 0 (6,300) (6,300) 0
Bowmore Primary School - Gaelic Medium Grant 0 0 0 0 0 0 (38) (38) 0
Service Development Total 0 0 0 0 0 0 (7,771) (7,771) 0
Strategic Change
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary School 0 0 0 0 0 0 (137) (137) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (2,320) (2,320) 0 (7,979) (7,979) 0
HWD - FFE (Funded by LA) 0 0 0 0 0 0 (350) (350) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Net Departmental Total 1,532 1,539 (7) 19,922 19,558 364 144,427 144,429 (2)
30 June 2023
Total Project CostsFull Year This Financial YearCurrent Financial Year To Date
Appendix 8
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR DOUGLAS HENDRY
Page 89

Page 90

ARGYLL AND BUTE COUNCIL - CAPITAL PLAN MONITORING REPORT
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget
Year End
Forecast
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Flood Prevention 14 14 0 807 807 0 1,305 1,305 0
Coastal Protection 1 1 0 99 99 0 199 199 0
Coastal Change Adaptation 5 5 0 158 158 0 158 158 0
Bute Sea Wall Repairs 10 10 0 100 100 0 680 680 0
Helensburgh Flood Mitigation 1 1 0 428 428 0 428 428 0
Bridge Strengthening 76 76 0 1,336 1,336 0 1,686 1,686 0
Local Bridge Maintenance Fund 49 49 0 1,000 1,000 0 5,203 5,203 0
Roads Reconstruction 0 0 0 7,032 7,032 0 15,032 15,032 0
Roads Reconstruction - Helensburgh CHORD 0 0 0 47 47 0 47 47 0
Roads Reconstruction - Oban CHORD 0 0 0 3 3 0 3 3 0
Helensburgh CHORD - Signage etc 0 0 0 10 10 0 10 10 0
Lighting 0 0 0 890 890 0 1,040 1,040 0
Environmental Projects 165 165 0 650 650 0 1,021 1,021 0
Play Park Refurbishment 0 0 0 312 312 0 938 938 0
Public Convenience Upgrades 0 0 0 82 82 0 82 82 0
Footway Improvements 0 0 0 750 750 0 750 750 0
Glengorm - Capping 0 0 0 0 0 0 0 0 0
Glengorm - Cell and Transfer Station (PB) 36 36 0 85 85 0 85 85 0
Gartbreck - Capping 4 4 0 200 200 0 200 200 0
EV Quick Chargers 0 0 0 62 62 0 62 62 0
Tobermory Car Park 0 0 0 96 96 0 96 96 0
Active Travel 0 0 0 389 389 0 389 389 0
Block Allocation - RIS 0 0 0 0 0 0 4,268 4,268 0
Server Sustainability 0 0 0 209 209 0 1,042 1,042 0
PC Replacement 148 148 0 330 330 0 1,479 1,479 0
Telecomms Network 87 87 0 256 256 0 256 256 0
Asset Sustainability Total 596 596 0 15,331 15,331 0 36,459 36,459 0
Service Development Projects
Preliminary design for  Regional Transport projects 0 0 0 16 16 0 221 221 0
Campbeltown Old Quay 0 0 0 43 43 0 1,424 1,424 0
Fleet Management - Prudential Borrowing 747 747 0 2,187 2,187 0 4,861 4,861 0
Fleet Management 0 0 0 325 325 0 4,538 4,538 0
Lismore Ferry 0 0 0 15 15 0 672 672 0
Oban Depot Development Project 2 2 0 (63) 2 (65) 2,117 2,182 (65)
Lochgilphead Depot Rationalisation 0 0 0 8 8 0 37 37 0
Jackson's Quarry Refurbishment 0 0 0 0 0 0 285 285 0
Witchburn Road Demolition 0 0 0 0 0 0 158 158 0
Safe Streets, Walking and Cycling (CWSS) 0 0 0 370 370 0 3,383 3,383 0
SPT - bus infrastructure 0 0 0 0 0 0 1,430 1,430 0
Cycleways - H&L (FSPT) 0 0 0 300 300 0 3,402 3,402 0
Helensburgh Public Realm - Arts Strategy Fund 0 0 0 50 50 0 53 53 0
Town Centre Funds 17 17 0 358 368 (10) 3,969 3,979 (10)
Rural Growth Deal 51 51 0 132 132 0 182 182 0
Dunoon Cycle Bothy 95 95 0 292 292 0 563 563 0
Dunoon STEM Hub 4 4 0 713 713 0 2,558 2,558 0
Ardrishaig North Active Travel 69 69 0 112 112 0 880 880 0
Nature Restoration Fund 0 0 0 346 346 0 346 346 0
Gibraltar Street Public Realm Improvements 0 0 0 222 222 0 250 250 0
Hermitage Park 0 0 0 26 26 0 3,388 3,388 0
Service Development Total 1,003 1,003 0 5,794 5,869 (75) 37,737 37,812 (75)
Strategic Change Projects
Campbeltown Flood Scheme 3,664 3,664 0 9,860 9,860 0 15,215 15,215 0
Street Lighting LED Replacement 1 1 0 674 674 0 3,900 3,900 0
Harbour Investment Programme 148 148 0 9,200 9,200 0 91,292 91,292 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - Oban Airport Business Park 1 1 0 101 101 0 590 590 0
TIF - Halfway House Roundabout 0 0 0 574 574 0 640 640 0
Strategic Change Total 3,814 3,814 0 20,410 20,410 0 114,021 114,021 0
Total Expenditure 5,413 5,413 0 41,535 41,610 (75) 188,217 188,292 (75)
INCOME
Asset Sustainability
EV Quick Chargers 0 0 0 (27) (27) 0 (27) (27) 0
Roads Reconstruction (27) (27) 0 (83) (83) 0 (83) (83) 0
Tobermory Car Park 0 0 0 (400) (400) 0 (400) (400) 0
Asset Sustainability Total (27) (27) 0 (510) (510) 0 (510) (510) 0
Service Development Projects
Applications Projects 0 0 0 (46) (46) 0 (437) (437) 0
Safe Streets, Walking and Cycling 215 215 0 (376) (376) 0 (2,988) (2,988) 0
SPfT 0 0 0 (25) (25) 0 (1,268) (1,268) 0
Cycleways - H&L (FSPT) 0 0 0 (590) (590) 0 (3,502) (3,502) 0
Town Centre Funds 0 0 0 (275) (275) 0 (1,887) (1,887) 0
Rural Growth Deal 0 0 0 (152) (152) 0 (182) (182) 0
Dunoon STEM Hub 0 0 0 (2,050) (2,050) 0 (2,558) (2,558) 0
Ardrishaig North Active Travel 0 0 0 0 0 0 (50) (50) 0
Dunoon Cycle Bothy 0 0 0 (394) (394) 0 (563) (563) 0
Gibraltar Street Public Realm Improvements 0 0 0 0 0 0 (250) (250) 0
Hermitage Park 0 0 0 0 0 0 (3,319) (3,319) 0
Fleet Management - PB 0 0 0 (2,187) (2,187) 0 (4,861) (4,861) 0
Lochgilphead Depot Rationalisation 0 0 0 0 0 0 0 0 0
Millpark Depot Demolition Insurance 0 0 0 0 0 0 (53) (53) 0
Oban Depot - Mill Park Insurance Claim 0 0 0 0 0 0 (1,681) (1,681) 0
Oban Depot - Appin Depot Sale 0 0 0 0 0 0 0 0 0
Lismore Ferry 0 0 0 0 0 0 (500) (500) 0
Witchburn Road Demolition 0 0 0 0 0 0 (157) (157) 0
Service Development Total 215 188 27 (6,095) (6,122) 27 (24,256) (24,283) 27
Strategic Change Projects
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (148) (148) 0 (9,200) (9,200) 0 (91,292) (91,292) 0
01 TIF - Lorn/Kirk Road 0 0 0 (676) (676) 0 (2,717) (2,717) 0
Strategic Change Total (148) (148) 0 (9,876) (9,876) 0 (94,279) (94,279) 0
Total Income 40 13 27 (16,481) (16,508) 27 (119,045) (119,072) 27
Net Departmental Total 5,453 5,426 27 25,054 25,102 (48) 69,172 69,220 (48)
30 June 2023
Full Year This Financial Year Total Project Costs
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR KIRSTY FLANAGAN
Appendix 8
Page 90

Page 91

CAPITAL PLAN 2023-24 APPENDIX 9
Overall Summary
Service
Previous Years
£000's
2023-24                                           
£000s
2024-25                 
£000s
2025-26                
£000s
2026-27                 
£000s
2027-28                
£000s Total
Education 39,077 7,917 3,126 3,521 0 0 53,641
Shared Offices 17,025 1,907 3,396 977 0 0 23,305
ICT 2,529 1,137 1,243 888 0 0 5,797
RIS 26,197 36,801 37,320 55,347 2,737 0 158,402
DEG 18,331 3,597 2,090 0 0 0 24,018
HSCP 1,246 2,223 828 477 0 0 4,774
Live Argyll 1,274 1,291 428 427 0 0 3,420
CHORD 68,156 9,645 1,684 226 0 0 79,711
Overall Total 173,835 64,518 50,115 61,863 2,737 0 353,068
Page 91

Page 92

CAPITAL PLAN 2023-24 APPENDIX 9
Education
Category Service Project
Previous
Years
£000's
2023-24                     
£000s
2024-25                 
£000s 2025-26                 £000s
2026-27            
£000s
2027-28            
£000s
Total
£000s
Asset Sustainability Education Asbestos Control/Removal Works 0 7 0 0 0 0 7
Block Allocation - Education 0 1,457 166 520 0 0 2,143
Digital Inclusion 20-21 0 9 0 0 0 0 9
Free School Meals 0 330 900 1,495 0 0 2,725
Homeless Houses - Housing Quality Standard 0 1 0 0 0 0 1
Internal Refurbishment Budget 0 7 0 0 0 0 7
Lochgilphead Primary School Demolition 0 0 0 0 0 0 0
Pre-5's/Nurseries 0 0 0 0 0 0 0
Primary Schools 0 3,955 1,835 1,280 0 0 7,070
School Houses - Housing Quality Standard 0 13 0 0 0 0 13
Secondary Schools 0 955 225 226 0 0 1,406
Asset Sustainability Total 0 6,734 3,126 3,521 0 0 13,381
Service Development Education Ardrishaig Primar School - Pre Five Extension 2 0 0 0 0 0 2
Bowmore Primary School - Gaelic Medium Grant 0 38 0 0 0 0 38
Bowmore Primary School - Pre Five Unit 149 0 0 0 0 0 149
Bunessan Primary School - Gaelic Medium Improvements 120 0 0 0 0 0 120
Clyde Cottage - 600 hours provision 556 23 0 0 0 0 579
CO2 Monitoring - Covid Mitigation in Schools 79 113 0 0 0 0 192
Craignish Primary School - Pre Five Extension (600 hours funding) 400 0 0 0 0 0 400
Early Learning and Childcare 850 0 0 0 0 0 850
Early Learning and Childcare - 1140 Hours 7,454 297 0 0 0 0 7,751
Early Learning and Childcare - 1140 Hours - CFCR 1,379 0 0 0 0 0 1,379
Iona Primary School - Pre Five Unit (600 hours funding) 490 0 0 0 0 0 490
Islay High & Rosneath PS Pitches 719 0 0 0 0 0 719
Lochgoilhead Primary School - Pre Five Unit (600 hours funding) 391 0 0 0 0 0 391
Park Primary Extension and Pre Fives Unit 341 0 0 0 0 0 341
Sandbank Gaelic Pre Five Unit 491 0 0 0 0 0 491
Service Development Total 13,421 471 0 0 0 0 13,892
Strategic Change Education Campbeltown Schools Redevelopment 2,092 38 0 0 0 0 2,130
Dunoon Primary School 10,635 234 0 0 0 0 10,869
Kirn Primary School 10,085 34 0 0 0 0 10,119
Replacement of Oban High School 2,844 406 0 0 0 0 3,250
Strategic Change Total 25,656 712 0 0 0 0 26,368
Overall Total 39,077 7,917 3,126 3,521 0 0 53,641
Page 92

Page 93

CAPITAL PLAN 2023-24 APPENDIX 9
Shared Office
Category Service Project
Previous
Years
£000's
2023-24     
£000s
2024-25      
£000s
2025-26      
£000s
2026-27        
£000s
2027-28    
£000s
Total
£000s
Asset Sustainability Shared Offices 5-7 East Clyde Street - Coastal Communities Fund 0 0 0 0 0 0 0
Argyll House, Dunoon 0 9 0 0 0 0 9
Asbestos Capital Property Works 0 51 0 0 0 0 51
Block Allocation 0 282 298 427 0 0 1,007
Bowmore Area Office 0 76 0 0 0 0 76
Burnett Building 0 0 110 0 0 0 110
Capital Property Works 0 38 0 0 0 0 38
Fire Risk Assessment Works 0 14 0 0 0 0 14
Helensburgh and Lomond Civic Centre - Emergency Heating Pipework 0 0 0 0 0 0 0
Hill Street Dunoon Rewire 0 33 0 0 0 0 33
Kilmory Castle 0 0 1,409 0 0 0 1,409
Legionella Control Works 0 144 0 0 0 0 144
Manse Brae District Office 0 0 0 0 0 0 0
Manse Brae Roads Office 0 2 0 0 0 0 2
Our Modern Workspace 0 683 480 0 0 0 1,163
Asset Sustainability Total 0 1,332 2,297 427 0 0 4,056
Strategic Change Shared Offices Campbeltown Office Rationalisation 595 1 0 0 0 0 596
Carbon Management - Group Heating Conversion Project (Prudential Borrowing)1,938 10 0 0 0 0 1,948
Carbon Management Business Cases (FPB) 201 60 0 0 0 0 261
Carbon Management Capital Property Works 16/17 19 20 0 0 0 0 39
Carbon Management Fuel Conversions (FPB) 107 0 0 0 0 0 107
Clean Energy - NDEEF1 328 224 193 0 0 0 745
Clean Energy - NDEEF2 0 50 540 550 0 0 1,140
Helensburgh Office Rationalisation  (FPB,REC) 11,538 300 0 0 0 0 11,838
Kilmory Biomass Project OBC (FPB,REV) 956 0 0 0 0 0 956
Net Zero 0 -366 366 0 0 0 0
Non-NPDO Schools PV Panel Installations 400 88 0 0 0 0 488
NPDO Schools Solar PV Panel Installations 761 183 0 0 0 0 944
Oil to Gas Heating Conversions (FPB) 182 5 0 0 0 0 187
Strategic Change Total 17,025 575 1,099 550 0 0 19,249
Overall Total 17,025 1,907 3,396 977 0 0 23,305
Page 93

Page 94

CAPITAL PLAN 2023-24 APPENDIX 9
Major Projects
Category Service Project
Previous
Years
£000's
2023-24    
£000s
2024-25    
£000s
2025-26     
£000s
2026-27          
£000s
2027-28     
£000s
Total
£000s
Strategic Change CHORD CHORD - Dunoon 12,495 27 0 0 0 0 12,522
CHORD - Helensburgh -Public Realm Imprv 6,529 28 0 0 0 0 6,557
CHORD - Oban 7,279 626 0 0 0 0 7,905
CHORD - Rothesay 15,231 6,871 1,684 226 0 0 24,012
Helensburgh Waterfront Development 23,415 977 0 0 0 0 24,392
HWD - FFE 316 34 0 0 0 0 350
Kilmory Business Park Phase 2AA 47 1,082 0 0 0 0 1,129
OBC for Dunoon Pier 2,844 0 0 0 0 0 2,844
Strategic Change Total 68,156 9,645 1,684 226 0 0 79,711
Overall Total 68,156 9,645 1,684 226 0 0 79,711
Page 94

Page 95

CAPITAL PLAN 2023-24 APPENDIX 9
ICT
Category Service Project
Previous
Years
£000's
2023-24      
£000s
2024-25      
£000s
2025-26      
£000s
2026-27     
£000s
2027-28       
£000s
Total
£000s
Asset Sustainability ICT Block Allocation - ICT 0 0 0 0 0 0 0
PC Replacement 0 330 669 480 0 0 1,479
Server Sustainability 0 209 425 408 0 0 1,042
Telecomms Network 0 256 0 0 0 0 256
Asset Sustainability Total 0 795 1,094 888 0 0 2,777
Service Development ICT Applications Projects 2,529 342 149 0 0 0 3,020
Service Development Total 2,529 342 149 0 0 0 3,020
Overall Total 2,529 1,137 1,243 888 0 0 5,797
Page 95

Page 96

CAPITAL PLAN 2023-24 APPENDIX 9
Roads and Infrastructure Services
Category Service Project
Previous
Years
£000's
2023-24     
£000s
2024-25    
£000s
2025-26   
£000s
2026-27    
£000s
2027-28    
£000s
Total
£000s
Asset Sustainability RIS Block Allocation 0 0 0 4,268 0 0 4,268
Bridge Strengthening 0 1,336 350 0 0 0 1,686
Bute Sea Wall Repairs 0 100 580 0 0 0 680
Coastal Change Adaptation 0 158 0 0 0 0 158
Coastal Protection 0 99 100 0 0 0 199
Environmental Projects 0 650 371 0 0 0 1,021
EV Quick Chargers 0 62 0 0 0 0 62
Flood Prevention 0 807 305 155 38 0 1,305
Footway Improvements 0 750 0 0 0 0 750
Glengorm - Capping 0 0 0 0 0 0 0
Glengorm - Cell and Transfer Station (PB) 0 85 0 0 0 0 85
Helensburgh CHORD - Signage etc 0 10 0 0 0 0 10
Helensburgh Flood Mitigation 0 428 0 0 0 0 428
Investment in Active Travel 0 389 0 0 0 0 389
Lighting 0 890 150 0 0 0 1,040
Local Bridge Maintenance Fund 0 1,000 4,000 203 0 0 5,203
Plant and Machinery 0 0 0 0 0 0 0
Public Convenience Upgrades 0 82 0 0 0 0 82
Roads Reconstruction 0 7,032 8,000 0 0 0 15,032
Roads Reconstruction - Helensburgh CHORD 0 47 0 0 0 0 47
Roads Reconstruction - Oban CHORD 0 3 0 0 0 0 3
Tobermory Car Park 0 96 0 0 0 0 96
Asset Sustainability Total 0 14,336 14,091 5,017 38 0 33,482
Service Development RIS Campbeltown Old Quay 1,381 43 0 0 0 0 1,424
Depot Rationalisation 0 0 0 0 0 0 0
Fleet Management - Prudential Borrowing 2,674 2,187 0 0 0 0 4,861
Jackson's Quarry Refurbishment 285 0 0 0 0 0 285
Lismore Ferry Replacement 637 15 20 0 0 0 672
Lochgilphead Depot Rationalisation 29 8 0 0 0 0 37
Oban Depot Development 2,180 -63 0 0 0 0 2,117
Preliminary design for  Regional Transport projects (tif) 205 16 0 0 0 0 221
Witchburn Road Demolition 158 0 0 0 0 0 158
Service Development Total 10,582 2,531 1,200 0 0 0 14,313
Strategic Change RIS Campbeltown Flood Scheme 4,992 9,860 29 330 4 0 15,215
Harbour Investment Programme PB 7,397 9,200 22,000 50,000 2,695 0 91,292
Street Lighting LED Replacement 3,226 674 0 0 0 0 3,900
Strategic Change Total 15,615 19,734 22,029 50,330 2,699 0 110,407
Overall Total 26,197 36,601 37,320 55,347 2,737 0 158,202
Page 96

Page 97

CAPITAL PLAN 2023-24 APPENDIX 9
Development and Economic Growth
Category Service Project
Previous
Years
£000's
2023-24    
£000s
2024-25   
£000s
2025-26    
£000s
2026-27     
£000s
2027-28     
£000s
Total
£000s
Service Development DEG Ardrishaig North Active Travel 755 112 13 0 0 0 880
Cycleways - H&L (FSPT) 2,812 300 290 0 0 0 3,402
Dunoon Cycle Bothy 259 292 12 0 0 0 563
Dunoon STEM Hub 95 713 1,750 0 0 0 2,558
Gibraltar Street Public Realm Improvements 28 222 0 0 0 0 250
Helensburgh Public Realm - Arts Strategy Fund 3 50 0 0 0 0 53
Hermitage Park 3,362 26 0 0 0 0 3,388
Nature Restoration Fund 0 346 0 0 0 0 346
Rural Growth Deal 50 132 0 0 0 0 182
Safe Streets, Walking and Cycling (CWSS) 3,013 370 0 0 0 0 3,383
SPT - bus infrastructure 1,405 0 25 0 0 0 1,430
Town Centre Funds 3,611 358 0 0 0 0 3,969
Service Development Total 15,393 2,921 2,090 0 0 0 20,404
Strategic Change DEG 01 TIF - Lorn/Kirk Road 2,169 1 0 0 0 0 2,170
05 TIF - North Pier Extension 214 0 0 0 0 0 214
09 TIF - Oban Airport Business Park 489 101 0 0 0 0 590
TIF - Halfway House Roundabout 66 574 0 0 0 0 640
Strategic Change Total 2,938 676 0 0 0 0 3,614
Overall Total 18,331 3,597 2,090 0 0 0 24,018
Page 97

Page 98

CAPITAL PLAN 2023-24 APPENDIX 9
Health & Social Care Partnership
Category Service Project
Previous
Years
£000's
2023-24   
£000s
2024-25   
£000s
2025-26   
£000s
2026-27    
£000s
2027-28    
£000s
Total
£000s
Asset Sustainability HSCP Ardfenaig 0 23 0 0 0 0 23
Block Allocation 0 785 292 184 0 0 1,261
Capital Property Works 0 79 0 0 0 0 79
Digitalising telecare 0 100 0 0 0 0 100
Dunoon Hostel 0 0 0 0 0 0 0
Eadar Glinn 0 0 0 0 0 0 0
East King Street Childrens Home 0 58 0 0 0 0 58
Glencruitten Hostel 0 81 36 143 0 0 260
Gortonvogie 0 0 0 0 0 0 0
Greenwood/Woodlands 0 216 0 0 0 0 216
Lochgilphead Resource Centre 0 16 0 0 0 0 16
Rothesay Community Education Centre 0 0 0 0 0 0 0
Shellach View 0 142 0 0 0 0 142
Thomson Home Rothesay 0 0 0 0 0 0 0
Tigh An Rudha HFE 0 600 500 150 0 0 1,250
Tobermory Top Flat 0 22 0 0 0 0 22
Asset Sustainability Total 0 2,169 828 477 0 0 3,474
Service Development HSCP Dunclutha Childrens Home 1,246 54 0 0 0 0 1,300
Service Development Total 1,246 54 0 0 0 0 1,300
Overall Total 1,246 2,223 828 477 0 0 4,774
Page 98

Page 99

CAPITAL PLAN 2023-24 APPENDIX 9
Live Argyll
Category Service Project
Previous
Years
£000's
2023-24    
£000s
2024-25    
£000s
2025-26    
£000s
2026-27   
£000s
2027-28 
£000s
Total
£000s
Asset Sustainability Live Argyll Aqualibrium 0 368 20 40 0 0 428
Corran Halls Gaelic Centre 0 113 46 84 0 0 243
Inveraray CARS 0 0 0 0 0 0 0
Kintyre Community Education Centre - Lift Shaft Refurbishment 0 2 0 0 0 0 2
LA - Indoor Cycles 0 0 0 0 0 0 0
Lochgilphead Library Relocation 0 14 0 0 0 0 14
Moat Centre (Roofing) 0 0 0 0 0 0 0
Queen's Hall - Partition Wall 0 0 0 0 0 0 0
Riverside Leisure Centre - Spa Pool Upgrade 0 17 0 0 0 0 17
The Moat Centre 0 77 0 0 0 0 77
The Moat Centre - Heating Upgrade 0 0 0 0 0 0 0
The Moat Centre - Window Upgrade 0 0 0 0 0 0 0
Victoria Halls, Helensburgh 0 78 0 0 0 0 78
Asset Sustainability Total 0 1,270 428 427 0 0 2,125
Service Development Live Argyll Riverside Leisure Centre Refurbishment 1,245 0 0 0 0 0 1,245
Service Development Total 1,245 0 0 0 0 0 1,245
Strategic Change Live Argyll Carbon Management 29 21 0 0 0 0 50
Strategic Change Total 29 21 0 0 0 0 50
Overall Total 1,274 1,291 428 427 0 0 3,420
Page 99

Page 100

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 10 AUGUST 2023 
TREASURY MANAGEMENT MONITORING REPORT – 30 JUNE 2023 
1. EXECUTIVE SUMMARY 
1.1. This report sets out the Council’s treasury management position for the period 1 April
2023 to 30 June 2023 and includes information on: 
• Overall borrowing position
• Borrowing activity
• Investment activity
• Economic background
• Interest rate forecast
• Prudential Indicators 
1.2. Estimated borrowing is below the Capital Financing Requirement for the period to 30
June 2023, at this stage in the financial year capital expenditure is below target.
Capital expenditure continued to be lower than anticipated over the last twelve months
however there is an expectation this will increase back up again over 2023-24 which
will continue to be monitored closely.  
1.3. The net movement in external borrowing in the period 1 April 2023 to 30 June 2023
was a decrease of £10.072m. 
1.4. The levels of investments were £90.502m at 30 June 2023. The rate of return
achieved was 4.437% compared to the target SONIA rate which was 4.578%. 
1.5 The Council has significant cash balances which are invested in accordance with its
Annual Treasury Management Strategy on the basis of security first, liquidity second
and then return.
Page 100

Page 101

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 10 AUGUST 2023 
TREASURY MANAGEMENT MONITORING REPORT – 30 JUNE 2023 
2. INTRODUCTION 
2.1. This report sets out the Council’s treasury management position for the period 1
April 2023 to 30 June 2023 and includes information on: 
• Overall borrowing position
• Borrowing activity
• Investment activity
• Economic background
• Interest rate forecast
• Prudential Indicators 
3. DETAIL
Overall Borrowing Position 
3.1. The table below details the estimated capital financing requirement (CFR) and
compares this with the estimated level of external debt at 31 March 2023. The CFR
represents the underlying need for the Council to borrow to fund its fixed assets and
accumulated capital expenditure. 
Forecast Forecast Forecast
2023/24 2024/25 2025/26
£000 £000 £000
CFR at 1 April 291,782 303,333 319,602
Net Capital Expenditure 23,281 28,461 51,388
Less Loans Fund Principal Repayments (5,950) (6,254) (6,573)
Less: NPDO Repayment (5,780) (5,938) (6,235)
Estimated CFR 31 March 303,333 319,602 358,182
Less Funded by NPDO (111,564) (111,784) (106,846)
Estimated Net CFR 31 March 191,769 207,818 251,336
Estimated External Borrowing at 31 March 176,532 221,513 261,510
Gap 15,237 (13,695) (10,174) 
Page 101

Page 102

3.2. Borrowing is below the Capital Financing Requirement for the period to 30 June 2023.
Whilst borrowing rates are still comparatively low the Council has significant cash
balances which reduces the need to borrow in the short term. 
3.3. The Council’s Treasury Management Strategy states that any decision to borrow in
advance will be within forward approved Capital Financing Requirement estimates. 
3.4. The Council’s estimated net capital financing requirement at 30 June 2023 is
£191.769m. The table below shows how this has been financed. £132.464m is funded
by loans and there are substantial internal balances of £149.807m of which £90.502m
are currently invested, as detailed in section 3.7, leaving a net internal balance of
£59.305m. 
Position at
31/03/23
Position at
30/06/23
£000 £000
Loans 142,536 132,464
Net Internal Balances 29,893 59,305
Total CFR 172,429 191,769 
3.5. During the period from 1 April to 30 June 2023, £10.098m of loans were repaid and £0.026m
of new borrowing was taken.  The analysis of the movement in borrowing is shown in the table
below: 
Actual
£000
(10,098)
26
Net Movement in External Borrowing (10,072)
External Loans Repaid 1st April 2023 to 30th June 2023
Borrowing undertaken 1st April 2023 to 30th June 2023
3.6. The table below summarises the movement in the level and rate of temporary
borrowing at the start and end of the period. 
£000 % Rate
Temp borrowing at 31st March 2023 10,378 3.40%
Temp borrowing at 30th June 2023 308 4.90% 
Page 102

Page 103

Investment Activity
3.7     The average rate of return achieved in the Council’s investments to 30 June 2023  was
4.437% compared to the SONIA (Sterling Overnight Index Average) rate for the same period
of 4.578%. The Council’s rate of return is marginally less than SONIA due to the rapid
rise in interest rates which increased SONIA faster than the Council was able to
redeem its existing lower rated investments. At 30 June 2023 the Council had
£90.502m of short term investments at an average rate of 4.437%. The table below
details the counterparties that the investments were placed with, the maturity date, the
interest rate and the credit rating applicable for each counterparty. 
Counterparty Maturity Amount £000 Interest
Rate
Rating  S&P
Clydesdale Bank Instant 5,202 4.90% Short Term A-2, Long
First Abu Dhabi bank 10/08/2023 5,000 3.12% Short Term A-1+,
Australia and New Zealand Banking Group 06/10/2023 5,000 4.99% Short Term A-1+,
Toronto Dominion Bank 13/10/2023 5,000 5.25% Short Term A-1+,
Cambridgeshire County Council 22/07/2024 5,000 1.00% AA
Thurrock Borough Council 31/07/2023 5,000 3.00% AA
Thurrock Borough Council 19/09/2023 5,000 3.50% AA
London Borough of Croydon 10/10/2024 5,000 4.10% AA
Close Brothers 31/07/2023 2,500 4.10% Short Term A-1, Long
National Bank of Kuwait 09/04/2024 7,500 5.13% Short Term A-1, Long
First Abu Dhabi Bank 09/05/2024 5,000 5.27% Short Term A-1+,
National Bank of Kuwait 10/11/2023 2,500 5.00% Short Term A-1, Long
Goldman Sachs 10/11/2023 2,500 4.91% Short Term A-1, Long
London Borough of Croydon 10/06/2024 5,000 5.30% AA
Australia and New Zealand Banking Group 13/09/2023 5,000 5.04% Short Term A-1+,
DBS Bank 13/09/2023 5,000 4.98% Short Term A-1+,
Money Market Fund - BNP Paribas Call 8,400 4.93% AAA
MMF - Aviva Call 6,900 4.84% AAA
Total 90,502 
3.8 All investments and deposits are in accordance with the Council’s approved list of
counterparties and within the limits and parameters defined in the Treasury
Management Practices. The counterparty list is constructed based on assessments
by leading credit reference agencies adjusted for additional market information
available in respect of counterparties. 
3.9 The Council has significant cash balances which are invested in accordance with its
Annual Treasury Management Strategy. These cash balances are in excess of what
is required for normal operating purposes but the economic environment for
investments has improved over the last few months with an increase in interest rates,
making investing these monies easier than in previous years.
Page 103

Page 104

Economic and Interest Rate Forecasts 
3.10 The latest economic background is shown in Appendix 1 with the interest rate forecast
in Appendix 2.
Prudential Indicators 
3.11 The prudential indicators for 2023-24 are attached in Appendix 3. 
4. CONCLUSION 
4.1 In the period from 1 April 2023 to 30 June 2023, the Council’s borrowing decreased
by £10.072m, it is currently below the Capital Financing Requirement. There are
substantial internal balances, of which £90.502m is currently invested. The investment
returns were 4.437%. 
5. IMPLICATIONS 
5.1 Policy –       None.  
5.2 Financial –      Complies with Annual Treasury Strategy.
5.3  Legal –       None.
5.4 HR –       None.
5.5 Fairer Duty Scotland –     None. 
5.5.1 Equalities – protected characteristics –  None.
5.5.2 Socio-economic Duty –    None.
5.5.3 Islands –      None.
5.6  Climate Change –     None.
5.7 Risk –       None.
5.8 Customer Service –     None. 
Kirsty Flanagan
Section 95 Officer
8 July 2023 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
Appendix 1 – Economic Background
Appendix 2 – Interest Rate Forecast
Appendix 3 – Prudential Indicators 
For further information contact Anne Blue, Head of Financial Services 
anne.blue@argyll-bute.gov.uk
Page 104

Page 105

Appendix 1 – Economics Update 
• The first quarter of 2023/24 saw: 
- A 0.2% m/m rise in real GDP in April, partly due to fewer strikes; 
- CPI inflation falling from 10.1% to 8.7% in April, before remaining at 8.7% in May.  This was the highest
reading in the G7;
- Core CPI inflation rise in both April and May, reaching a new 31-year high of 7.1%;
- A tighter labour market in April, as the 3myy growth of average earnings rose from 6.1% to 6.5%;
- Interest rates rise by a further 75bps over the quarter, taking Bank Rate from 4.25% to 5.00%; 
- 10-year gilt yields nearing the “mini-Budget” peaks, as inflation surprised to the upside.
• The economy has weathered the drag from higher inflation better than was widely expected. The 0.2% m/m
rise in real GDP in April, following March’s 0.3% m/m contraction will further raise hopes that the economy
will escape a recession this year. Some of the strength in April was due to fewer strikes by train workers and
teachers in that month. Moreover, some of the falls in activity in other areas in April were probably temporary
too. Strikes by junior doctors and civil servants contributed to the fall in health output (0.9% m/m) and the
meagre 0.1% m/m increase in public administration.
• The fall in the composite Purchasing Managers Index (PMI) from 54.0 in May to a three-month low of 52.8
in June (>50 points to expansion in the economy, <50 points to contraction) was worse than the consensus
forecast of 53.6. Both the services and manufacturing PMIs fell. The decline in the services PMI was bigger
(from 55.2 to 53.7), but it remains consistent with services activity expanding by an annualised 2%. The fall
in the manufacturing PMI was smaller (from 47.1 to 46.2), but it is consistent with the annual rate of
manufacturing output falling from -0.8% in April to around -5.0%. At face value, the composite PMI points to
the 0.1% q/q rise in GDP in Q1 2023 being followed by a 0.2% q/q gain in Q2 2023.
• Meanwhile, the 0.3% m/m rise in retail sales volumes in May was far better than the consensus forecast of
a 0.2% m/m decline and followed the robust 0.5% m/m rise in April. Some of the rise was due to the warmer
weather. Indeed, the largest move was a 2.7% m/m jump in non-store sales, due to people stocking up on
outdoor-related goods. But department stores also managed to squeeze out a 0.6% m/m rise in sales and
the household goods sub-sector enjoyed a reasonable performance too. Overall, the figures were far better
than analysts had expected. In addition, the GfK measure of consumer confidence rebounded from -27 to a
17-month high of -24 in June.
• The recent resilience of the economy has been due to a confluence of factors including the continued
rebound in activity after the pandemic, households spending some of their pandemic savings, and the tight
labour market and government handouts both supporting household incomes. That said, as government
support fades, real household incomes are unlikely to grow rapidly. Furthermore, higher interest rates will
mean GDP is likely to contract later this year. Our central assumption is that inflation will drop to the 2.0%
target only if the Bank triggers a recession by raising rates from 5.00% now to at least 5.5% and keeps rates
there until at least mid-2024.  Our colleagues at Capital Economics estimate that around 60% of the drag on
real activity from the rise in rates has yet to bite, and the drag on the quarterly rate of real GDP growth over
the next year may be about 0.2ppts bigger than over the past year.
• The labour market became tighter over the quarter and wage growth reaccelerated. Labour demand was
stronger than the consensus had expected. The three-month change in employment rose from +182,000 in
March to +250,000 in April. Meanwhile, labour supply continued to recover as the size of the labour force
grew by 303,000 in the three months to April. That was supported by a further 140,000 decline in inactivity
as people returned to work from retirement and caring responsibilities (while inactivity due to long-term sick
continued to rise). But it was not enough to offset the big rise in employment, which meant the unemployment
rate fell from 3.9% to 3.8%
• The tighter labour market supported wage growth in April, although the 9.7% rise in the National Living Wage
on 1st April (compared to the 6.6% increase in April last year) probably had a lot to do with it too. The 3myy
rate of average earnings growth reaccelerated from 6.1% to 6.5% (consensus 6.1%) and UK wage growth
remains much faster than in the US and the Euro-zone.  In addition, regular private sector wage growth
Page 105

Page 106

increased from 7.1% 3myy to 7.6%, which left it well above the Bank’s forecast for it to fall below 7.0%.
Overall, the loosening in the labour market appears to have stalled in April and regular private sector wage
growth was well above the Bank’s forecast.
• CPI inflation stayed at 8.7% in May (consensus 8.4%) and, perhaps more worryingly, core CPI inflation rose
again, from 6.8% to a new 31-year high of 7.1%. The rise in core inflation built on the leap from 6.2% in
March to 6.8% and means it is accelerating in the UK while it is slowing in the US and the Euro-zone (both
fell to 5.3%). A further decline in fuel inflation, from -8.9% to -13.1%, and the second fall in food inflation in
as many months, from 19.3% to 18.7%, explained why overall CPI inflation didn’t rise. And the scheduled
fall in the average annual utility price from £2,500 to £2,074 on 1st July means overall CPI inflation will
probably ease in the coming months. But the problem is that the recent surge in core inflation and the
reacceleration in wage growth shows that domestic inflationary pressures are still strengthening.
• This suggests the Bank may have more work to do than the Fed or ECB.  Indeed, the Bank of England
sounded somewhat hawkish in the June meeting. This came through most in the MPC’s decision to step up
the pace of hiking from the 25bps at the previous two meetings. The 7-2 vote, with only two members voting
to leave rates unchanged at 4.50%, revealed support for stepping up the fight against high inflation.
• That said, the Bank has not committed to raising rates again or suggested that 50bps rises are now the norm.
What it did say was that “the scale of the recent upside surprises in official estimates of wage growth and
services CPI inflation suggested a 0.5 percentage point increase in interest rates was required at this
particular meeting”.  Moreover, the Committee did not strengthen its forward guidance that any further rate
hikes would be conditional on the data.  However, it looks highly probable, given the on-going strength of
inflation and employment data, that the Bank will need to raise rates to at least 5.5% and to keep rates at
their peak until the mid-point of 2024.  We still think it is only a matter of time before the rise in rates weakens
the economy sufficiently to push it into recession. That is why instead of rising to between 6.00%-6.25%, as
is currently priced in by markets, we think rates are more likely to peak between 5.50-6.00%. Our forecast is
also for rates to be cut in the second half of 2024, and we expect rates to then fall further than markets are
pricing in. 
• Growing evidence that UK price pressures are becoming increasingly domestically generated has driven up
market interest rate expectations and at one point pushed the 10-year gilt yield up to 4.49% in late June,
very close to its peak seen after the “mini-budget”. Yields have since fallen slightly back to 4.38%. But
growing expectations that rates in the UK will remain higher for longer than in the US mean they are still
more than 70 bps above US yields. While higher interest rates are priced into the markets, the likely dent to
the real economy from the high level of interest rates is not. That’s why we think there is scope for market
rate expectations to fall back in 2024 and why we expect the 10-year PWLB Certainty Rate to drop back from
c5.20% to 5.00% by the end of this year and to 4.20% by the end of 2024.
• The pound strengthened from $1.24 at the start of April to a one-year high at $1.26 in early May, which was
partly due to the risks from the global banking issues being seen as a bigger problem for the US than the
UK. The pound then fell back to $1.23 at the end of May, before rising again to $1.28 in the middle of June
as the strong core CPI inflation data released in June suggested the Bank of England was going to have to
raise rates more than the Fed or ECB in order to tame domestic inflation. However, sterling’s strong run may
falter because more hikes in the near term to combat high inflation are likely to weaken growth (and,
hopefully, at some point inflation too) to such a degree that the policy rate will probably be brought back
down, potentially quite quickly, as the economic cycle trends downwards decisively. This suggests that
additional rate hikes are unlikely to do much to boost the pound.
• In early April, investors turned more optimistic about global GDP growth, pushing up UK equity prices. But
this period of optimism appears to have been short-lived. The FTSE 100 has fallen by 4.8% since 21st April,
from around 7,914 to 7,553, reversing part of the 7.9% rise since 17th March. Despite the recent resilience
of economic activity, expectations for equity earnings have become a bit more downbeat.  Nonetheless,
further down the track, more rate cuts than markets anticipate should help the FTSE 100 rally. 
MPC meetings 11th May and 22nd June 2023
• On 11th May, the Bank of England’s Monetary Policy Committee (MPC) increased Bank Rate by 25 basis
points to 4.50%, and on 22nd June moved rates up a further 50 basis points to 5.00%.  Both increases
reflected a split vote – seven members voting for an increase and two for none.  
Page 106

Page 107

• Nonetheless, with UK inflation significantly higher than in other G7 countries, the MPC will have a difficult
task in convincing investors that they will be able to dampen inflation pressures anytime soon.  Talk of the
Bank’s inflation models being “broken” is perhaps another reason why gilt investors are demanding a
premium relative to US and Euro-zone bonds, for example.
• Of course, what happens outside of the UK is also critical to movement in gilt yields.  The US FOMC has
already hiked short-term rates to a range of 5.00%-5.25%, but a further increase is pencilled in for July, whilst
the ECB looks likely to raise its Deposit rate at least once more to a peak of 3.75%, with upside risk of higher
to come. 
Page 107

Page 108

Appendix 2 – Interest Rate Forecast 
The Council has appointed Link Group as its treasury advisors and part of their service is to assist the Council
to formulate a view on interest rates. The PWLB rate forecasts below are based on the Certainty Rate (the
standard rate minus 20 bps) which has been accessible to most authorities since 1st November 2012. 
The latest forecast, made on 26th June, sets out a view that both short and long-dated interest rates will be
elevated for some little while, as the Bank of England seeks to squeeze inflation out of the economy, against a
backdrop of a stubbornly robust economy and a tight labour market. 
You will note that our forecasts have steadily increased during the quarter as the data continued to spring upside
surprises, and the Bank of England continued to under-estimate how prevalent inflation is, and how tight the
labour market is.  The Government has also noted that despite immigration increasing markedly, high levels of
ill-health amongst the workforce has led to wage demands remaining strong until such time as there is a
loosening in demand for business services. 
Our current and previous PWLB rate forecasts below are based on the Certainty Rate. 
• LIBOR and LIBID rates ceased at the end of 2021. In a continuation of previous views, money market yield
forecasts are based on expected average earnings by local authorities for 3 to 12 months.
• The Link forecast for average earnings are averages i.e., rates offered by individual banks may differ
significantly from these averages, reflecting their different needs for borrowing short-term cash at any one
point in time. 
A SUMMARY OVERVIEW OF THE FUTURE PATH OF BANK RATE
• Our central forecast for interest rates was previously updated on 25th May and reflected a view that the
MPC would be keen to further demonstrate its anti-inflation credentials by delivering a succession of rate
increases.  This has happened to a degree, especially as it moved to a more aggressive 0.5% hike in
June but, with inflation remaining elevated, we anticipate that Bank Rate will need to increase to at least
5.5%, if not higher, to sufficiently slow the UK economy and loosen the labour market.
• Moreover, we also still anticipate the Bank of England will be keen to loosen monetary policy when the
worst of the inflationary pressures are behind us – but timing on this will remain one of fine judgment: cut
too soon, and inflationary pressures may well build up further; cut too late and any downturn or recession
may be prolonged.  Our current judgment is that rates will have to increase and stay at their peak until
the second quarter of 2024 as a minimum.
Page 108

Page 109

• In the upcoming months, our forecasts will be guided not only by economic data releases and
clarifications from the MPC over its monetary policies and the Government over its fiscal policies, but
also international factors such as policy development in the US and Europe, the provision of fresh support
packages to support the faltering recovery in China as well as the on-going conflict between Russia and
Ukraine and whether there are any further implications for Russia itself following the recent aborted
mutiny by the Wagner group. 
• On the positive side, consumers are still estimated to be sitting on excess savings left over from the
pandemic, which could cushion some of the impact of the above challenges and may be the reason why
the economy is performing somewhat better at this stage of the economic cycle than may have been
expected.  However, most of those excess savings are held by more affluent people whereas lower
income families already spend nearly all their income on essentials such as food, energy and
rent/mortgage payments. 
PWLB RATES
• Gilt yield curve movements have shifted upwards, especially at the shorter end of the yield curve
since our previous forecast but remain relatively volatile.  PWLB 5 to 50 years Certainty Rates
are, generally, in the range of 4.90% to 5.60%.  
• We view the markets as having built in, already, nearly all the effects on gilt yields of the likely
increases in Bank Rate and the elevated inflation outlook. 
The balance of risks to the UK economy: -
• The overall balance of risks to economic growth in the UK is to the downside. 
Downside risks to current forecasts for UK gilt yields and PWLB rates include: - 
• Labour and supply shortages prove more enduring and disruptive and depress economic activity (accepting
that in the near-term this is also an upside risk to inflation and, thus, the rising gilt yields we have seen of late).
• The Bank of England increases Bank Rate too fast and too far over the coming months, and subsequently
brings about a deeper and longer UK recession than we currently anticipate. 
• UK / EU trade arrangements – if there was a major impact on trade flows and financial services due to
complications or lack of co-operation in sorting out significant remaining issues. 
• Geopolitical risks, for example in Ukraine/Russia, China/Taiwan/US, Iran, North Korea and Middle Eastern
countries, which could lead to increasing safe-haven flows. 
• A broadening of banking sector fragilities, which have been successfully addressed in the near-term by
central banks and the market generally, but which may require further intervention if short-term interest rates
stay elevated for longer than is anticipated. 
Upside risks to current forecasts for UK gilt yields and PWLB rates: - 
• Despite the recent tightening by 0.5%, the Bank of England proves too timid in its pace and strength of
increases in Bank Rate and, therefore, allows inflationary pressures to remain elevated for a longer period
within the UK economy, which then necessitates Bank Rate staying higher for longer than we currently project.
• The pound weakens because of a lack of confidence in the UK Government’s fiscal policies, resulting in
investors pricing in a risk premium for holding UK sovereign debt.
• Longer-term US treasury yields rise strongly if inflation remains more stubborn than the market currently
anticipates, pulling gilt yields up higher consequently.
• Projected gilt issuance, inclusive of natural maturities and QT, could be too much for the markets to
comfortably digest without higher yields compensating. 
Page 109

Page 110

Appendix 3 – Prudential Indicators 
(1).  EXTRACT FROM BUDGET
Forecast
Outturn
Original
Estimate
Forecast
Outturn
Forecast
Outturn
Capital Expenditure £'000 £'000 £'000 £'000
Non - HRA 23,281 43,110 28,461 51,388
TOTAL 23,281 43,110 28,461 51,388
Ratio of financing costs to net revenue stream
Non - HRA 4.25% 4.37% 4.40% 4.43%
Net borrowing requirement
brought forward 1 April * 291,782 304,498 372,359 319,602
carried forward 31 March * 303,333 372,359 319,602 358,182
in year borrowing requirement 11,551 67,861 (52,757) 38,580
In year Capital Financing Requirement
Non - HRA 11,551 67,861 (52,757) 38,580
TOTAL 11,551 67,861 (52,757) 38,580
Capital Financing Requirement as at 31 March    
Non - HRA 303,333 372,359 319,602 358,182
TOTAL 303,333 372,359 319,602 358,182
Page 110

Page 111

PRUDENTIAL INDICATOR 2023-24 2024-25 2025-26
(2).  TREASURY MANAGEMENT PRUDENTIAL INDICATORS £'M £'M £'M
Authorised limit for external debt -    
borrowing 268 283 305
other long term liabilities 112 113 108
TOTAL 380 396 413
Operational boundary for external debt -     
borrowing 263 278 300
other long term liabilities 109 110 105
TOTAL 372 388 405
Upper limit for fixed interest rate exposure
Principal re fixed rate borrowing 190% 190% 190%
Upper limit for variable rate exposure
Principal re variable rate borrowing 60% 60% 60%
Upper limit for total principal sums invested for over 364 days £20m £20m £20m
(per maturity date)
Maturity structure of new fixed rate borrowing during 2023/24
under 12 months       
12 months and within 24 months
24 months and within 5 years
5 years and within 10 years
10 years and above
upper limit lower limit
30% 0%
30% 0%
30% 0%
40% 0%
100% 0%
Page 111

Page 112

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 10 AUGUST 2023
RESERVES AND BALANCES – UPDATE AS AT 30 JUNE 2023 
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to advise Members of the overall level of
reserves held by the Council as well as providing detail on the monitoring of the
earmarked balances held within the General Fund. 
1.2 The Council has a total of £666.354m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
1.3 At 31 March 2023 the Council had a total of £93.828m of usable reserves.  Of this:
• £2.916m relates to the Repairs and Renewals Fund
• £4.503m relates to Capital Funds
• £86.409m was held in the General Fund, with £79.466m of this balance
earmarked for specific purposes.
1.4 Of the earmarked balance of £79.466m: 
• £37.305m is invested or committed for major initiatives/capital projects
• £29.842m is still to be drawn down in 2023-24
• £12.319m is planned to be spent in future years 
1.5 The Council’s General Fund contingency level is set at 2% of net expenditure for
2023-24 which equates to £5.691m.  At the beginning of the financial year there
was £1.252m of unallocated General Fund Balance (over and above contingency). 
At the Council meeting on 23 February 2023 it was agreed that the budgeted
revenue surplus of £0.019m would be transferred into the general fund. After taking
this into consideration and the current forecast outturn position for 2023-24, the
Council is forecast to have a £1.271m surplus over contingency. 
Page 112

Page 113

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 10 AUGUST 2023
RESERVES AND BALANCES - UPDATE AS AT 30 JUNE 2023 
2. INTRODUCTION 
2.1 This report outlines current balances on the Council’s reserves, both usable and
unusable. It also provides detail on the monitoring of the earmarked balances
within the General Fund.   
3. DETAIL 
3.1 Types of Reserves 
3.1.1 Usable Reserves - Councils have powers to establish certain resource backed
reserves which can be used to fund expenditure.  The powers of councils to
establish reserves are laid out in Schedule 3 of the Local Government
(Scotland) Act 1975.  These allow councils to establish a Renewal and Repairs
Fund, Insurance Fund and Capital Fund. Councils can also establish a Useable
Capital Receipts Reserve.  The Council must also maintain a General Fund and
can earmark balances for specific purposes within the General Fund. 
3.1.2 Unusable Reserves – Councils are also required to establish certain reserves
that are not backed by resources. They are required purely for accounting
purposes and do not represent resources available for councils to utilise. The
Pensions Reserve, Revaluation Reserve, Capital Adjustment Account, Financial
Instruments Adjustment Account and Accumulated Absences Account are
examples of unusable reserves. 
3.2 Reserve Balances at 31 March 2023 
3.2.1 The balances on each type of reserve at 31 March 2023 are set out in the two
tables below, per the Unaudited Accounts for 2022-23. 
Unusable Reserves £000
Revaluation Reserve 174,952
Capital Adjustment Account 268,788
Financial Instruments Adjustment Account (1,871)
Pensions Reserve 232,073
Accumulated Absences Account (7,588)
Total Unusable Reserves 666,354 
Usable Reserves £000
Repairs and Renewals Fund 2,916
Capital Fund and Usable Capital Receipts Reserve 4,503                                                                                                                
General Fund  86,409
Total Usable Reserves  93,828
Total Reserves  760,182 
Page 113

Page 114

3.2.2 The Revaluation Reserve represents the unrealised gains in the valuation of
fixed assets. The Capital Adjustment Account represents the difference
between depreciation based on proper accounting practice and statutory
charges for financing capital expenditure. The Financial Instruments Adjustment
Account represents the difference between gains and losses on borrowing and
statutory capital financing charges. The Pensions Reserve represents the
difference between pension costs based on proper accounting practice and
payments made for pension costs. The Accumulated Absences Account
represents the costed difference between holiday pay entitlement and actual
holidays taken at 31 March. 
3.2.3 The Repairs and Renewals Fund was established to support funding of renewal
and replacement of school equipment.  Schools can only draw on the Repairs
and Renewals Fund to the extent they have previously paid into the Fund and
contributions must be contained within schools devolved budgets. 
3.2.4 The Capital Fund was established to receive all capital receipts generated by
the Council and can be used to support the capital plan or meet the principal
repayments on loan charges. The Council decides as part of the budget
process each year how it wishes to draw funding from the Capital Fund. 
3.2.5 The Usable Capital Receipts Reserve relates to the accumulated unspent
capital receipts from sale of council houses prior to transfer of the housing
stock. The reserve forms part of the Council’s Strategic Housing Fund and can
only be used for investment in social housing. The reserve will be used in
accordance with the approach to investing in housing agreed by the Council in
August 2012. 
3.3 General Fund 
3.3.1 The General Fund balance at 31 March 2023 can be analysed as follows: 
Balance
31/03/23
£000
Balance on General Fund as at 31 March 2022 96,081
Decrease to General Fund balance at end of 2022-23 (9,672)
Earmarked Balances (79,466)
Contingency allowance at 2% of net expenditure (5,691)
Unallocated balance as at 31 March 2023 1,252 
3.3.2 The General Fund includes balances that the Council has agreed to earmark for
specific purposes. Some of these earmarked balances will be spent during the
current financial year and some of them will be held over and spent in later
years. The table below shows the balance at 31 March 2023, the amounts that
are currently invested or set aside for major initiatives, the amount already
spent and planned to be spent in the current year, the amount to be spent in
future years and any sums no longer required to be earmarked. Appendix 1
provides further details on the breakdown of unspent budget earmarkings. 
Page 114

Page 115

Officers have reviewed and updated the spending profiles. Appendix 2 provides
further details on the breakdown of COVID reserves.   
3.4 Unallocated General Fund Balance 
3.4.1  The Council’s General Fund contingency is set at 2% of net expenditure for
2023-24 and amounts to £5.691m.  At the beginning of the financial year there
was £1.252m of unallocated General Fund Balance (over and above
contingency).   After taking into consideration the budgeted allocation to the
General Fund agreed by Council on 23 February 2023 of £0.019m and the
current forecast outturn position for 2023-24, the Council is forecast to have a
£1.271m surplus over contingency.
Earmarking
Category
Balance
31/03/2023 -
per year
end
published
report
Transfers
between
categories
Invested or
committed
for major
initiatives
/capital
projects
Drawn-
down to
2023-24
Budget as
at 30/06/23
Still to be
drawn-
down in
2023-24
Planned
Spend
Future
Years
Released to
General
Fund
£000 £000 £000 £000 £000 £000 £000
Strategic Housing
Fund 7,247 7,247
Investment in
Affordable
Housing
3,163 3,163
Capital Projects 16,059 16,059
Lochgilphead and
Tarbert
Regeneration
1,460 1,460
Support for Rural
Growth Deal 756 756
Asset
Management
Investment
2,098 2,098
Piers and
Harbours
Investment Fund
2,789 2,789
Scottish
Government
Initiatives
2,834 1,986 848
CHORD 378 150 228
DMR Schools 1,394 1,394
Energy Efficiency
Fund 218 218
Existing Legal
Commitments 476 476
Unspent Grant 13,179 489 11,754 936
Unspent Third
Party Contribution 265 251 14
Previous Council
Decision - Other 3,808 1,847 1,500 461
Redundancy
Provision 1,578 500 1,078
Supporting
Organisational
Change
1,426 200 1,226
One Council
Property Team 566 189 377
Fleet - Timing
Delay 658 658
Hermitage Park 19 19
Electric Vehicle
Chargers 17 17
COVID-19 5,512 257 4,644 611
Unspent Budget 13,566 1,140 5,903 6,523
Totals 79,466 0 37,305 0 29,842 12,319 0
Page 115

Page 116

3.4.2  The revenue budget position as at 30 June 2023 was estimated to be a
£0.319m underspend within Social Work.  There are no other reported
variances at this stage. 
3.4.3 Social Work, as a part of the Integrated Joint Board (IJB), are able to hold any
surplus within reserves therefore it is expected that any underspend that
materialises would be transferred to the IJB reserves and the General Fund of
the Council would not be impacted.    
3.4.4  The table below summarises the position of the unallocated General Fund
balance taking into consideration the points noted above. 
Heading Detail £000
Unallocated General Fund
as at 31 March 2023
This is the balance that is
unallocated over and above the 2%
contingency, which amounts to
£5.691m
1,252
Budgeted allocation to
General Fund for 2023-24
Budget
Per the Budget Motion at Council on
23 February 2023
19
Current Forecast Outturn
for 2023-24 as at 30 June
2023
Per paragraph 3.4.2. This is from
Social Work as other departments
have not yet reported variances
319
Social Work outturn
adjustment
Per paragraph 3.4.3 - Social Work
would expect to transfer their
surplus to internal IJB reserves
(319)
Estimated Unallocated
balance as at 31 March
2024 
1,271 
3.5 Loans Fund Review 
3.5.1 At the Council meeting on 27 February 2020, it was agreed that the one-off re-
profiling gain of £20.561m generated by the loans fund review should be used
partly to create a provision for the increasing principal repayments over the next
10 years (£7.649m) with the remainder of the gain (£12.912m) used to fund
known liabilities/cost pressures. The table below shows what has been drawn
down against the one-off gain and the remaining balance. 
Agreed
Allocation
Transferred
to
Earmarked
Reserves in
previous
years
Transferred
to
Earmarked
Reserves 
23-24 
Balance
Remaining 
£000 £000 £000 £000
Provision for the increasing
principal repayments 7,649   7,649
Provision to Support
Organisational Change 500 (500)  0
Page 116

Page 117

Estimated Cost of 2020-21
redundancies that are part of
budget savings proposals
600 (600)  0
Future Redundancies
Provision 1,500 (1,500)  0
Spend to Save Route
Optimisation 100 (100)  0
Funding Gap in Capital
Programme 2,619   2,619
Capital Programme
Intolerable Red Risks 574 (574)  0
Campbeltown Flood
Prevention Scheme 1,406 (1,406)  0
Significant Strategic Change
Projects  5,013 (2,856)  2,157
2020-21 Revenue Budget
Contribution  600 (600)  0 
20,561 (8,136) 0 12,425 
4. CONCLUSION 
4.1 The report outlines the overall reserves and balances for the Council covering
the purpose and level of each reserve.  It also provides detail as to expenditure
against earmarked balances held within the General Fund.   
4.2 As at 30 June 2023 the estimated unallocated General Fund, after taking into
consideration the budget motion, the current forecast outturn for 2023-24 and
the expected adjustment in relation to the Social Work outturn, the Council is
estimated to have a £1.271m surplus over contingency. 
5. IMPLICATIONS 
5.1 Policy - Earmarked funds and funds set aside for delivery of
Single Outcome Agreement are available to support
Council Policy.
5.2 Financial -  Outlines the balances held with the Council’s usable
and unusable reserves.     
5.3 Legal -  None.
5.4 HR -  None.
5.5 Fairer Scotland Duty- None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty -  None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  A contingency of £5.691m (equivalent to 2% of net
expenditure) has been set aside as part of the
general fund.  This has been subject to a risk
assessment. 
5.8 Customer Service -  None. 
Kirsty Flanagan
Executive Director/Section 95 Officer 
Page 117

Page 118

7 July 2023 
Policy Lead for Finance and Commercial Services - Councillor Gary Mulvaney 
APPENDICES
Appendix 1 – Earmarked Reserves breakdown of unspent budget
Appendix 2 – Earmarked Reserves breakdown of COVID earmarkings 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk 
Page 118

Page 119

APPENDIX 1
Earmarked Reserves - Unspent Budget
As at 30 June 2023
Ref Department Service Description Opening Balance Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in 23-
24
Planned to
spend in future
years
Plans for Use Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent in 2024-
25
Amount
Planned to be
Spent from
2025/26
onwards
001 Chief Executive's Unit Community Planning Communities and Partnership
Team
8,855 8,855 8,855 0 The funds have originated from externally sourced income due to an employee being seconded to the
Scottish Community Development Centre (SCDC).  The funds will be used to support the team in relation
to meeting its priorities of Building Back Better (Communities), Climate Change and the review of the
Argyll and Bute Outcome Improvement Plan.
8,855 0
002 Executive Director
(Douglas Hendry)
Across Services /
Education
Digital Projects (Supply Staff
Booking System)
25,100 25,100 9,900 15,200 To deliver a number of Digital ServiceTransformation Projects with a commitment of £0.035m towards a
Supply Staff Booking system.  Phase 1 of the project is nearing completion.
9,900 15,200
003 Executive Director
(Douglas Hendry)
Commercial Services Rothesay Academy - Demolition
and Waste Disposal
895,000 895,000 55,000 840,000 Since Rothesay Academy was vacated over 15 years ago no site clearance has taken place and there are
potential Health and Safety and insurance cover implications due to deterioration of the building.
£55,000 earmarking will allow clearance of remaining materials and debris.
Also £840,000 to fund estimated future costs of demolition (subject to removal of listed status) to be
added to an existing earmarking . There are potential Health and Safety and insurance cover implications
due to deterioration of the building.
55,000 840,000 0
004 Executive Director
(Douglas Hendry)
Commercial Services Rothesay Pavilion Charity 750,000 750,000 0 750,000 Agreed at Council meeting February 2020, £750k additional revenue support subject to conditions which
seek to minimise the risk to the Council as far as is reasonably practicable including requirement for
adequate business and financial management and regular reporting by RPC.
0 750,000
005 Executive Director
(Douglas Hendry)
Commercial Services Rothesay Pavilion Essential
repairs
306,400 306,400 0 306,400 Essential repairs to deal with potential health and safety risks and to avoid further deterioration.  Budget
provision was approved by the Policy and Resources Committee on 21 August 2014. 
0 306,400
006 Executive Director
(Douglas Hendry)
Commercial Services Estates - NDR Revaluation
Appeals
84,688 84,688 84,688 0
The Council agreed to make provision to meet the cost of appealing Non Domestic Rates (NDR)
revaluations which were imposed from April 2017. The remaining funds were carried forward to the
2023/24 revaluation cycle however a recent change in position by the Scottish Government may restrict
the appeals which can be made. This is still under discussion and Gerald Eve Surveyors have been
appointed as specialist advisers on this matter. In the event that appeals are limited there may be an
opportunity to utilise Gerald Eve for more general valuation advice subject to Procurement approval.
84,688 0
007 Executive Director
(Douglas Hendry)
Commercial Services Demolition of former
Lochgilphead Primary and
Rothesay Secondary School
58,875 58,875 58,875 0 To fund the demolition of the former Lochgilphead Primary School and former Rothesay Academy
(subject to the removal of the listing). Lochgilphead Primary complete and remainder of funds to be
used to commence Rothesay Project.
58,875 0
008 Executive Director
(Douglas Hendry)
Commercial Services Mid Argyll Community Pool 30,000 30,000 30,000 0 At the Council Budget meeting on 23 February 2023, the Council committed to a one-off investment of
£0.030m to Mid Argyll Community Pool in response to an external funding request
30,000 0
009 Executive Director
(Douglas Hendry)
Commercial Services MacTaggart Leisure Islay 30,000 30,000 30,000 0 At the Council Budget meeting on 23 February 2023, the Council committed to a one-off investment of
£0.030m to MacTaggart Leisure, Islay in response to an external funding request
30,000 0
010 Executive Director
(Douglas Hendry)
Commercial Services Site Investigation Works 21,013 21,013 21,013 0 For Site Investigation works in relation to Tweeddale Street Car Park and Oban Airport Business Park,
exploring commercial opportunities to develop the sites and raise revenue income for Argyll and Bute
Council. HUB North were instructed to procure contractors to undertake the site investigations these are
now complete. The remainder of the budget is intended to be utilised for other site investigation and
pre-development works to further develop commercial opportunities across the council area.
21,013 0
011 Non Departmental /
Executive Director
(Douglas Hendry)
Across Services /
Commercial Services
Information Management
(Estates Survey Work)
12,697 12,697 12,697 0 To support a number of initiatives in respect of improving the Council's information management in line
with the transformation agenda and increasing the pace of change as outlined in the BV Review.  The
planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k, document
management and workflow system for Planning, Building Standards and Environmental Health £77k and
a balance of funding to explore information management solutions in a strategic and coherent way
£209k
12,697 0
012 Executive Director
(Douglas Hendry)
Commercial Services (2023 Contract Inflation
Adjustments) MAKI/Islay Pools
SLA - inflationary increase
9,523 9,523 9,523 0 Additional pressure resulting from the February 2023 inflation rate being higher than the assumptions
built into the non-pay inflation calculation which went to Council at budget setting and reflects the
difference between what was in the budget and what will need to be paid under the SLAs. The February
inflation figure wasn't known until the middle of March, after the budget was set, and the recent trend
in inflation reductions turned around in February with an increase.
9,523 0 0
013 Executive Director
(Douglas Hendry)
Education ASN Review 1,255,000 1,255,000 0 1,255,000 To fund capital costs of ASN adaptations as part of ASN Review to increase equity of provision across
Argyll and Bute.  This will be subject to a business case as part of the wider ASN review.
0 1,255,000 0
014 Executive Director
(Douglas Hendry)
Education Reduced Teacher Staffing Costs -
Strike Action
800,000 800,000 0 800,000 To fund one off savings in 2024-25 from the underspend in staffing from strike action. 0 800,000 0
015 Executive Director
(Douglas Hendry)
Education (2023 Digital Projects) School
WiFi Upgrades
200,000 200,000 150,000 50,000 To extend WiFi coverage within school settings through the purchase of additional hardware such as
access points, switches and other networking hardware. This will result in more flexible learning spaces
and support the growing number of devices within schools. 
150,000 50,000 0
016 Executive Director
(Douglas Hendry)
Education Education Transformation Fund 146,579 146,579 146,579 0 At the Council meeting on 27 February 2020, it was agreed to input £400k into Education Digital
Learning.  The additional funds have been spent in 20/21, 21/22 and 22/23 as part of the ongoing
transformation work in the Education service, focussing on digital and virtual learning technology and
the development of learning clusters.  This will continue into 2023/24.
146,579 0
Page 119

Page 120

Ref Department Service Description Opening Balance Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in 23-
24
Planned to
spend in future
years
Plans for Use Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent in 2024-
25
Amount
Planned to be
Spent from
2025/26
onwards
017 Executive Director
(Douglas Hendry)
Education MCR Pathways Pilot 80,000 80,000 50,000 30,000 Funding to support implementation of MCR Pathways mentoring programme within three secondary
schools for 2023-24 academic year. Funding will allow the employment of a dedicated Co-ordinator
within each setting to develop and implement the programme which is designed to benefit care
experienced and other disadvantaged pupils through targeted mentoring support.
50,000 30,000 0
018 Executive Director
(Douglas Hendry)
Education Gaelic Specific Grant 30,000 30,000 30,000 0 Proposal to fund the continuation of the Principal Teacher Languages (Gaelic focus) post for the 2023-24
academic year to promote and develop Gaelic Medium Education across Argyll and Bute. This
earmarking refers to the Council contribution towards the Gaelic grant for 22-23.
30,000 0 0
019 Executive Director
(Douglas Hendry)
Education (2023 Digital Projects) Cashless
Catering
30,000 30,000 30,000 0 To support the ongoing implementation of the new cashless catering system during the testing and roll
out phase.
30,000 0 0
020 Executive Director
(Douglas Hendry)
Education Skype for Business for Education
/ Digital Projects (Skype for
Business)
10,000 10,000 10,000 0 To fund the initial capital costs for the implementation of Skype for Business for Education.  This will
bring the Education service in line with other council departments and will improve staff collaboration
and modernise school telephony to deliver the  service more efficiently and cost effectively.
A balance was released back to the general fund in 2021-22 because the rollout project was almost
complete with only £0.01m expected spend in 23/24.
10,000 0
021 Executive Director
(Douglas Hendry)
Education Education Learning Estate
Condition Surveys
1,815 1,815 1,815 0 To fund the delivery of School Core Facts (SCF) compliant Condition Surveys for prioritised School
Buildings.
1,815 0
022 Executive Director
(Douglas Hendry)
Legal and Regulatory
Services
Education Purchasing Officers 210,000 210,000 105,000 105,000 The earmarked funds will be used to fund an education purchasing team within the Procurement Service
for two years.  The team will embed good procurement practice, train headteachers on current
procurement process requirements, develop spend plans that evidence best value.
105,000 105,000
023 Non Departmental /
Executive Director
(Douglas Hendry)
Across Services / Legal
and Regulatory
Services
Information Management
(Digitalisation of Title Deeds)
92,000 92,000 92,000 0 To support a number of initiatives in respect of improving the Council's information management in line
with the transformation agenda and increasing the pace of change as outlined in the BV Review.  The
planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k (delay on
spending due to COVID-19), document management and workflow system for Planning, Building
Standards and Environmental Health £77k and a balance of funding to explore information management
solutions in a strategic and coherent way £209k
92,000 0
024 Executive Director
(Douglas Hendry)
Legal and Regulatory
Services
Councillor IT Equipment 44,557 44,557 29,557 15,000 There is currently no budget for the provision and renewal of IT equipment for members. the
earmarking identifies a resource to utilise spend for that purpose to ensure that members have
contuinued support in maintaining and replacing vital IT equipment.
29,557 15,000
025 Executive Director
(Douglas Hendry)
Legal and Regulatory
Services
Digital Projects: Hybrid Council
meetings
43,302 43,302 43,302 0 The funding will be used to maintain the ICT equipment used to support the provision of on-line and
hybrid Council meetings.
43,302 0
026 Executive Director
(Douglas Hendry)
Legal and Regulatory
Services
Debt Counselling & Welfare
Rights
21,452 21,452 5,965 15,487 To meet the cost of a Debt Counselling and Welfare Rights Management System. 5,965 15,487
027 Executive Director
(Douglas Hendry)
Legal and Regulatory
Support
(2023 Contract Inflation
Adjustments) NPDO and DBFM
School Contracts – inflationary
increase
350,000 350,000 350,000 0 Additional pressure resulting from the February 2023 inflation rate being higher than the assumptions
built into the non-pay inflation calculation which went to Council at budget setting and reflects the
difference between what was in the budget and what will need to be paid under the NPDO/Hub DBFM
Schools contracts. The February inflation figure wasn't known until the middle of March, after the
budget was set, and the recent trend in inflation reductions turned around in February with an increase.
350,000 0 0
028 Executive Director
(Douglas Hendry)
Legal and Regulatory
Support
(2023 Digital Projects)
Replacement of Council
Chambers Online Meeting
Equipment
130,000 130,000 130,000 0 Current online meeting system  is less than resilient and has failed on a number of occasions, leading to
issues at strategic committees. A condition assessment by the incumbent maintenance contractor has
highlighted that the current equipment is now at end of life and unsupportable due to the  obsolescence
of the system. Discussions with ICT have taken place to identify a simpler more robust solution to be
procured.
130,000 0 0
029 Executive Director
(Kirsty Flanagan)
Customer Support
Services
(2023 Digital Projects) iTrent
Project
332,000 332,000 147,000 185,000 Combination of parallel running of the new iTrent system alongside the legacy systems for up to 18
months whilst iTrent is implemented and additional staffing resource to implement iTrent in late June
2024 and support staff for the first 3 months of operation through summer 2024. Total includes £73k
from Financial services for funding additional staffing resource to implement the payroll components of
the iTrent HR and Payroll System by the end of June 2024 and support staff for the first 3 months of
operation during summer 2024.
147,000 185,000 0
030 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Security Operations Centre
Subscription
113,594 113,594 53,594 60,000 There is a requirement to pay for a 3-year subscription at £60,000 per annum with a cost pressure being
added to the ICT revenue budget to cover the costs from year 4 onwards.  There is unallocated funding
of £103,545 from the earmarking (172) created at 2020/21 year end for 'Digital Projects' combined with
this earmarking to cover these costs for 3 years.
53,594 60,000
031 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Growing our Own and Modern
Apprentices
109,150 109,150 95,790 13,360 Funding earmarked to support trainee development and modern apprenticeship opportunities based on
priority workforce risk areas. These areas have been identified and proposals developed. £95,790 to be
spent in 23/24 and £13,360 to be spent in 24/25 to fund a graduate trainee and 3 apprentices to deliver
trainee development and modern apprenticeship opportunities
95,790 13,360
032 Non Departmental /
Executive Director
(Kirsty Flanagan)
Across Services /
Customer Support
Services
Digital Projects (Increase in
Schools Bandwidth)
63,455 63,455 63,455 0 To complete one of a number of Digital Service Transformation projects with a commitment of £0.064m
to increase Schools Bandwidth. 
63,455 0
033 Executive Director
(Kirsty Flanagan)
Customer Support
Services
(2023 Digital Projects) Resilient
Website Project
60,000 60,000 60,000 0 Cybersecurity action to move to a cloud based website platform that would improve resilience and
enable service continuity in the event of a cyber attack.
60,000 0 0
034 Executive Director
(Kirsty Flanagan)
Customer Support
Services
(2023 Digital Projects) Digital
Project Officer
60,000 60,000 60,000 0 Employ a temporary Digital Project Officer as part of OD changes. 60,000 0 0
035 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Implementation of Gaelic
Language Plan
30,000 30,000 30,000 0 Agreed at Council Meeting February 2021.  Provision of funding for delivery and implementation of the
council’s Gaelic Language Plan in recognition of the contribution that Gaelic makes to economic growth
and to the tourism sector, and to enable delivery of key activities within the plan which currently receive
no revenue funding.
30,000 0
036 Executive Director
(Kirsty Flanagan)
Customer Support
Services
(2023 Digital Projects) Digital
Engagement Services Developer
28,000 28,000 28,000 0 To fund 50% of a new temporary LGE10 post.  The post is a Digital Engagement Services Developer that
will be provide capacity to deliver service efficiencies through the use of the the new CREATE/RPA
software.  The other 50% of the post can be funded from a current vacancy. 
28,000 0 0
Page 120

Page 121

Ref Department Service Description Opening Balance Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in 23-
24
Planned to
spend in future
years
Plans for Use Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent in 2024-
25
Amount
Planned to be
Spent from
2025/26
onwards
037 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Business Development Training 27,601 27,601 27,601 0 This budget is funding ongoing leadership development, coaching, action learning sets and
commissioned training including Priority Management.
27,601 0
038 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Learning and Development 19,436 19,436 19,436 0 In order to maximise the opportunities and efficiencies of digital learning, this funding will be used to
support the extension of digital learning in order to deliver the Digital Learning Strategy, which was
approved in FQ4 20/21.
19,436 0
039 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Establishing HR Service Centre 13,824 13,824 13,824 0 To facilitate the implementation of technical efficiency improvements and new processes 13,824 0
040 Non Departmental /
Executive Director
(Kirsty Flanagan)
Across Services /
Customer Support
Services
Digital Projects (Replacement
Learning Management System)
11,470 11,470 11,470 0 To deliver a number of Digital Service Transformation Projects with an original commitment of £0.030m
towards a replacement Learning Management System £0.030m.
11,470 0
041 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Planning Income (Saving 23-24) 340,000 340,000 340,000 0 To fund one off operational saving MGT5 agreed for the 2023/24 budget 340,000 0 0
042 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Planning Income 60,000 60,000 60,000 0 To fund additional resources to support and develop the Council's planning service. 60,000 0 0
043 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Oban TIF (Tax Incremental
Financing)
385,193 385,193 116,000 269,193 Will be used to fund the TIF Programme office for a further 3 years as well as the programme office for
Rural Growth Deal beyond the funding that was agreed at Council for this in February 2021.
116,000 269,193
044 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Strategic Events & Festivals 80,664 80,664 80,664 0 At the Council meeting on 25 February 21, a decision was taken to agree £90k funding for Events and
Festivals for 22/23, in order that the application process can commence during 21/22 and that this
agreed figure be augmented by any underspend remaining from the 20/21 financial year.  At 24
February 22, decision made to agree £90k for 23/24, in order that the application process can commence
during 22/23 and that this agreed figure be augmented by any underspend remaining from the 21/22
financial year.  Applications have been received and payments will be made in 2023-2024.
80,664 0
045 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Island Post 50,461 50,461 50,461 0 To fund a temporary post at LGE11 to assist with the National Islands Plan Implementation Route Map
2020-2025.
50,461 0
046 Non Departmental /
Executive Director
(Kirsty Flanagan)
Across Services /
Development and
Economic Growth
Information Management
(Document Management and
Workflow for Planning, Building
Standards and Environmental
Health)
21,177 21,177 21,177 0 To support a number of initiatives in respect of improving the Council's information management in line
with the transformation agenda and increasing the pace of change as outlined in the BV Review.  The
planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k, document
management and workflow system for Planning, Building Standards and Environmental Health £77k and
a balance of funding to explore information management solutions in a strategic and coherent way
£209k
21,177 0
047 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Royal National Mod 20,000 20,000 20,000 0 One off funding allocation for the Royal National Mod agreed as part of the budget setting process for
2019/20. Grant contract issued. Proposed payment of £20k per annum starting 2020/21  (2023/24 final
payment of £20k)
20,000 0
048 Executive Director
(Kirsty Flanagan)
Financial Services Financial Systems 33,748 33,748 33,748 0 To fund the completion of the implementation of the Oracle Fusion Financial Management System, a
software update for cash receipting to ensure card payments can still be taken and the procurement and
implementation of a new system to manage the requirements of the IFRS16 Leases accounting standard.
33,748 0
049 Executive Director
(Kirsty Flanagan)
Financial Services Accounting and Budgeting Team
Resilience
30,664 30,664 16,664 14,000 To fund the implementation of a new staffing structure in 2022/23 as agreed at ELT on 12 April 2022
which has been implemented.  The residual funding is being used to meet the costs of ongoing
professional accountancy  training over the period 2022/23 to 2026/27
16,664 14,000
050 Executive Director
(Kirsty Flanagan)
Financial Services CIPFA 24,040 24,040 6,000 18,040 CIPFA Training - To fund the professional training costs for staff undertaking the CIPFA professional
accountancy qualification.
6,000 18,040
051 Executive Director
(Kirsty Flanagan)
Roads & Infrastructure Waste Variation Monies 1,967,056 1,967,056 1,329,999 637,057 This will be used to fund/part-fund various waste infrastructure projects that will support the council’s
compliance with the 2025 ban on the Landfill of Biodegradable Municipal Waste. This will include scoping
work for the creation of a waste transfer station at Helensburgh and landfill cell construction works at
Gartbreck  (£640k for Capital works on Gartbreck completed in 2022/23, reserve will be drawn down for
this in 2023/24).
1,329,999 637,057
052 Executive Director
(Kirsty Flanagan)
Roads & Infrastructure 3G pitches / Tarbert Sports
Pitches
375,022 375,022 87,736 287,286 In November 2018, the Council agreed to a maintenance funding package to be progressed for a number
of 3G pitches including Tarbert. This funding will provide an estimated 6.5 years’ worth of ongoing
maintenance up to 2025-26. 
87,736 287,286
053 Executive Director
(Kirsty Flanagan)
Roads & Infrastructure Green Transport Initiatives 140,000 140,000 140,000 0 At the Council meeting on 27 February 2020, it was agreed to input £400k in Green transport,
investment in footway and cycle path maintenance supporting the healthy wellbeing and green agenda. 
Spend has been delayed due to COVID and this will be taken forward in 23/24. £260k Footways
Reconstruction programme now spent and will be drawn down against capital programme during 23/24.
£140k Ardrishaig North Project will be spent in 22/23 and drawn down in 23/24.
140,000 0
054 Executive Director
(Kirsty Flanagan)
Roads & Infrastructure Climate Change 81,884 81,884 81,884 0 At the Council meeting on 27 February 2020, it was agreed to input £500k budget to mitigate the
impacts of weather related damage and climate change with specific emphasis on gully cleaning and
drainage improvements.  Spend has been delayed due to COVID and the intention is to spend the funds
on 2 Gully Motors plus staff over next 2 years. Vehicles have been received and budget will be drawn
down to cover their cost. The remaining budget will be used towards running the vehicles.
81,884 0
055 Executive Director
(Kirsty Flanagan)
Roads & Infrastructure Amenity Services introduction of
management information system
28,099 28,099 0 28,099 Delay with introduction of amenity time recording system due to increased costs.  Discussions ongoing to
find alternative cheaper solution.  The software/system being introduced by HR/Payroll during 2023-24
offers a time-recording facility.  Although not included in the current HR/Payroll spec, once the new
system is up and running, the proposal would be to investigate the time-recording system to see if viable
for amenity time recording purposes.
0 28,099
056 Executive Director
(Kirsty Flanagan)
Roads & Infrastructure
Services
(2023 Contract Inflation
Adjustments) Waste PPP
255,000 255,000 255,000 0 Adjustment to inflation included in the budget based on updated RPIX figures at February 2023. 255,000 0 0
057 Non Departmental Non Departmental Underwriting development of
Rothesay Pavilion
1,000,000 1,000,000 0 1,000,000 Funding to meet additional costs identified as necessary for the refurbishment of Rothesay Pavilion. 0 1,000,000
058 Non Departmental Non Departmental Oban TIF (Tax Incremental
Financing - Excess NDR)
875,651 875,651 291,884 583,767 This is the surplus NDR after paying all Loans Charges in respect of TIF infrastructure projects.  This fund
will be used in the future as TIF projects are delivered.
291,884 291,884 291,883
Page 121

Page 122

Ref Department Service Description Opening Balance Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in 23-
24
Planned to
spend in future
years
Plans for Use Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent in 2024-
25
Amount
Planned to be
Spent from
2025/26
onwards
059 Non Departmental Non Departmental Loans Fund 385,279 385,279 385,279 0 At the Council Budget meeting on 24 February 2022, Saving FS01, a Loans Fund
Management/Operational saving for 22/23 budget of £0.500m was agreed with at least £0.200m to
come from underspends in 21/22.  The underspend position for 21/22 is £0.385m and this earmarking is
being released as a saving to help bridge the 2023/24 budget gap.
385,279 0
060 Non Departmental Non Departmental Loans Fund 300,000 300,000 300,000 0 To fund one off operational saving MGT3 agreed for the 2023/24 budget 300,000 0 0
061 Non Departmental Non Departmental Information Management
(Balance of Funding)
209,844 209,844 0 209,844 To support a number of initiatives in respect of improving the Council's information management in line
with the transformation agenda and increasing the pace of change as outlined in the BV Review.  The
planned initiatives include: Estates Survey work £122k, Digitalisation of Title Deeds £92k, document
management and workflow system for Planning, Building Standards and Environmental Health £77k and
a balance of funding to explore information management solutions in a strategic and coherent way
£209k
0 209,844
062 Non Departmental Non Departmental Spend to Save Route
Optimisation Software
100,000 100,000 100,000 0 One-off re-profiling gain as a result of the loans fund review to fund known liabilities/cost pressures as
agreed at budget setting meeting in February 2020 -  Spend to save route optimisation (£0.100m) which
will be spent over  2023/24.
100,000 0
063 Non Departmental Non Departmental Engagement with Hub North re
provision of services for olders
adults and vulnerable people
across Argyll and Bute
100,000 100,000 100,000 0 At the Council budget meeting February 23, an allocation of £0.1m from the Unallocated General Fund
balance for the Health and Social Care Partnership to engage, in partnership with the Council, with Hub
North to develop a strategic business case in relation to the provision of services for older adults and
other vulnerable people across Argyll and Bute.
100,000 0
064 Non Departmental Non Departmental CHARTS 80,000 80,000 80,000 0 As agreed at Council on 24 February 2022, investment in CHARTS £0.075m.  To support the organisation
in delivering targeted support, in communities, to the culture, arts and heritage sector as part of its plans
to contribute to overall economic recovery.
At the Council Budget meeting on 23 February 2023, the Council committed to £0.075m one-off
investment in CHARTS in response to an external funding request
80,000
065 Non Departmental Non Departmental Community Resilience Fund 76,447 76,447 0 76,447 Fund established in 2012/13 to be spent over more than one year. Fund reduced at the Council meeting
on 11 February 2016
0 76,447
13,565,615 0 0 13,565,615 6,001,435 7,564,180 6,001,435 7,272,297 291,883
Page 122

Page 123

APPENDIX 2
COVID
As at 30 June 2023
Ref Department Service Description Opening Balance Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in 23-
24
Planned to
spend in future
years
Plans for Use Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent in 2024-
25
Amount
Planned to be
Spent from
2025/26
onwards
001 Chief Executive's Unit Community Planning Community Planning - temp post
to support communities
55,000 55,000 55,000 0 As agreed at Policy & Resources committee on 9 December 2021, allocation of £0.055m to a post to
support the economic and social recovery together with the building back stronger themes.
55,000 0
002 Chief Executive's Unit Community Planning Covid impacts – support to
communities’
49,147 49,147 49,147 0 Funding provided in relation to the Local Self-Isolation Assistance Service.  The Community Planning and
Development Team will work with community groups to support their community response and
resiliency to Test and Protect and the longer term impacts of COVID-19 on local community
organisations.
49,147 0
003 Executive Director
(Douglas Hendry)
Education Logistics Funding - Safe Opening
of Schools
699,036 699,036 699,036 0 Scottish Government funding to ensure the safe opening and operation of schools. Includes transport,
PPE, cleaning, ventilation and expansion of estate. It is likely that any unused balances would have to be
returned to the Scottish Government.
699,036 0
004 Executive Director
(Douglas Hendry)
Education Additional Teaching/Support in
Schools/Digital Devices/Family
Home Learning Support Fund - 
421,198 421,198 421,198 0 Continuation of funding for additional staffing, teachers, support staff, additional devices for pupils and
additional family/home learning programmes.
421,198 0
005 Executive Director
(Douglas Hendry)
Education Education to Support Young
People
191,042 191,042 135,933 55,109 As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.600m.  Agreed to
fund a package of measures to boost the wellbeing and build back the resilience of young people, in
particular those most vulnerable, following the Covid-19 pandemic, including counselling and increased
provision of childcare for children under three. Notes that the Scottish Government is yet to confirm
details of funding for similar initiatives and, should our investment in children’s wellbeing qualify for this
funding, the balance will be re-allocated to the Recovery and Renewal Fund. 
135,933 55,109
006 Executive Director
(Douglas Hendry)
Education Recruitment of Additional
Teachers and Support Staff in
Schools
51,371 51,371 51,371 0 Fund additional teachers and support staff. 51,371 0
007 Executive Director
(Douglas Hendry)
Legal and Regulatory
Services
Welfare Rights Support 131,634 131,634 80,184 51,450 As agreed at the Council Meeting on 25 February 2021 - an allocation of £0.172m.  As part of our focus
on Improving Opportunities for People and Communities, agrees to provide additional resources to
proactively support people experiencing poverty and hardship, by investing in two additional Welfare
Rights support staff for two years.
80,184 51,450
008 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Self Isolated Support / Self
Isolated Support Grant (HR)
65,250 65,250 65,250 0 These were monies that were provided by Scotgov to fund additional overtime and resources for
Shielding/Caring for People and Test and Protect activities.
The funds are being used for a number of Customer Service and Business efficiency related projects
including a system and consultancy of RPA (robotic process automation) and application development.  A              
65,250 0
009 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Staycation and Marketing Argyll
and Bute
389,992 389,992 389,992 0 As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.800m.   This will
include provision of additional waste disposal facilities and other facilities that will be informed by the
Motorhome and Informal Camping Survey.               
389,992 0
010 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Tackling Digital Exclusion Top-Up
Fund
217,600 217,600 217,600 0 As agreed at the Council Meeting on 25 February 2021.  Establishes the Tackling Digital Exclusion Top Up
Fund to support communities and in some cases individuals that are missing out on national
programmes due to logistics and economies of scale.  While vouchers are available from the UK and
Scottish Governments in some cases these do not cover the full cost of infrastructure builds. 
Expenditure should be incurred during 23-24 to draw down against.
217,600 0
011 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
LACER Funding (Sector Support
Grant)
95,398 95,398 95,398 0 Local Authority COVID Economic Recovery Fund grant.  This will provide funding, either part of the small 
business development grant or standalone, to help micros and small business to implement projects that
95,398 0
012 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Economic Development - temp
post to support economic
recovery
55,000 55,000 55,000 0 As agreed at Policy & Resources committee on 9 December 2021, allocation of £0.055m to a post to
support the economic and social recovery together with the building back stronger themes.  To be used
to fund Settlement Project Support Officer during 23-24.
55,000 0
013 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
EH Covid Posts 37,775 37,775 37,775 0 Funding initially for 2 posts for 2 years.  Posts were intially recruited to with one leaving and the other
going on maternity leave resutling in delays in expenditure.  One employee is now back from maternity
leave and earmarked reserve will be drawn down to cover their costs in 23-24.
37,775 0
014 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
LACER Funding (New Enterprise
Support Grant)
31,159 31,159 31,159 0 Local Authority COVID Economic Recovery Fund grant.  This funding would provide £3,000 grants to help
new businesses start up and establish.  Fund fully committed, there was a delay in getting all payments
made and remainder will be made in 23-24.
31,159 0
015 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
LACER Funding (Shop Local) 26,793 26,793 26,793 0 Local Authority COVID Economic Recovery Fund grant.  This funding would provide funding to continue
the Shop Local scheme into 2022/23 and 2023/24, buying additional cards and allow the cards to gather
26,793 0
016 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
LACER Funding (Small Business
Development Grant)
24,988 24,988 24,988 0 Local Authority COVID Economic Recovery Fund grant.  This funding will provide funding of between
£500 and £5,000 to help existing micro and small businesses to improve their resilience or growth via
projects to implement green initiatives, implement digital development, implement marketing            
24,988 0
017 Executive Director
(Kirsty Flanagan)
Financial Services Housing Benefits Private 321,524 321,524 321,524 0 Specific funding allocation for Housing Benefit including DHP. Funds will be used to continue to support
vulnerable people initially financially affected by the COVID-19 outbreak but now facing the cost of living
crisis to sustain their tenancies.  This earmarking will help offset potential overspends in the DHP/
Scottish Welfare Fund budget going forward.
321,524 0
Page 123

Page 124

Ref Department Service Description Opening Balance Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in 23-
24
Planned to
spend in future
years
Plans for Use Amount
Planned to be
Spent in 2023-
24
Amount
Planned to be
Spent in 2024-
25
Amount
Planned to be
Spent from
2025/26
onwards
018 Executive Director
(Kirsty Flanagan)
Financial Services Flexible Food Fund 194,156 194,156 108,000 86,156 Financial Insecurity funding from Scottish Government routed into the Argyll and Bute Flexible Food and
Fuel Fund (ABFFFF) is aimed at tackling financial insecurity for adults and families across Argyll and Bute. 
Working in partnership with the Community Food Forum, Bute Advice Centre and ALIenergy, households                  
108,000 86,156
019 Executive Director
(Kirsty Flanagan)
Financial Services Flexible Funding for Supporting
People while at Tier 4 COVID
76,357 76,357 76,357 0 Funding from SG to strengthen local authority responses to meet emerging needs and support people in
their communities struggling with the restrictions and guidance at all protection levels re COVID,
particularly those at risk through health and social inequalities. This support could cover the same types
of support.  In June 2021 the Council agreed to support 20 projects led by a range of Council officers,
officers from the HSCP and members of the third sector to deliver wide ranging support across our
region.  A report will be presented to members in due course.
76,357 0
020 Executive Director
(Kirsty Flanagan)
Financial Services Self Isolated Support Grant 5,316 5,316 5,316 0 Unspent admin funding for processing Self isolation Support Grants. 5,316 0
021 Non Departmental Non Departmental Recovery and Renewal Fund 1,547,000 1,547,000 1,547,000 0 As agreed at Council on 24 February 2022, Recovery and Renewal Fund £1.547m.  This is provision for
future recovery, regeneration and renewal, as well as any future pressures which may arise following the
Covid-19 pandemic through a dedicated Recovery and Renewal Fund.  Commitments have been made
against this fund as follows: Levelling up bid costs £0.150m, Scotland Loves Local overspend £0.037m and
Rothesay Pavillion £1.360m.
1,547,000 0
022 Non Departmental Non Departmental COVID Funding 418,337 418,337 0 418,337 Net balance on COVID cost centres at year end 2022/23 with proposals on use to be developed. 0 0 418,337
023 Non Departmental Non Departmental Capital pressure 257,000 257,000 257,000 0 Pressure identified on the 20/21 COSLA COVID costs spreadsheets - requires to be earmarked to be
drawn down when required against the Capital Plan
257,000 0
024 Non Departmental Non Departmental Levelling up Fund bids per P&R
February 22
150,000 150,000 150,000 0 As agreed at Policy & Resources committee on 17 February 2022, an allocation of  up to £0.150m to
support Levelling Up Fund bids
150,000 0
5,512,073 0 0 5,512,073 4,901,021 611,052 4,901,021 192,715 418,337
Page 124

Page 125

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 10 AUGUST 2023
BUDGET OUTLOOK 2024-25 TO 2028-29  
1. EXECUTIVE SUMMARY 
1.1 This report provides an update to the budget outlook covering the period 2024-
25 to 2028-29, reported to the Policy and Resources Committee on 11 May
2023. 
1.2 The estimates within the report are based on the mid-range scenario with best
and worst case scenarios noted in Appendix 1. 
1.3  The assumptions in respect of future years Scottish Government funding 
remain unchanged from those reported on 11 May 2023 and range between
0.5% increase (best case) and 0.5% reduction (worst case) with a mid-range of
0%. This assumption is based on the settlement over the last few years and the
estimates within the spending review which indicate that a flat cash settlement
in future years may be the most likely position, however this assumption will be
kept under review and updated as necessary during 2023-24.  
1.4 There are no changes to my previous assumptions around the growth in
Council Tax. The Council tax base has been assumed to grow by 0.25% in the
worst case scenario, 0.5% in the mid-range scenario and 0.75% in the best
case. 
1.5 There are no changes to the base budget since the report on 11 May 2023. 
1.6 Similarly, there are no changes to the assumptions in respect of employee
costs for Council services which were previously noted as follows: 
 The SJC pay award for 2023-24 has still to be agreed and may have an
impact on the base budget if the pay award is greater than the 3.5%
allowed for in the budget. The teachers’ pay award for 2023-24 has already
been agreed to 31 July 2024 and the current budget is sufficient to cover
the deal.
 For future years, the mid-range scenario has been estimated at 2% on the
basis that it is expected that as inflation reduces it could take pressure off
pay awards. . It also reflects what is affordable to Local Government and
this 2% assumption is currently in line with many other Councils
assumptions.  
 Increments are estimated between £0.329m and £0.657m with mid-range
£0.657m. 
1.7 For non-pay inflation, only unavoidable/inescapable inflation has been built in
for the best case and mid-range scenarios with a contingency of £0.250m built
Page 125 Agenda Item 5

Page 126

into the mid-range. A further general inflationary increase has been built into
the worst case scenario. 
1.8 There are a number of cost and demand pressures for Council services built
into each scenario. Changes to these pressures since the report on 11 May
2023 are: 
 Amended - ASN Support increased to reflect continued growth in demand
 New - Repairs and Maintenance costs for the new Helensburgh Waterfront
Leisure Complex
 New - Depots – shortfall in previously agreed saving due to delays
 New - Public Transport Fares – shortfall in previously agreed saving due to
reduction in passenger numbers
 New – Insurance premiums have risen higher than previous forecasts 
1.9 In addition to the identified cost and demand pressures an allowance for
unidentified cost and demand pressures has been included in mid-range of
£0.500m per year (best case scenario £0.250m per year and worst case
scenario £1m per year). 
1.10 There will be a political decision to be made as to the future allocation to the
Health and Social Care Partnership.  As part of the budget agreed in February
2023, indicative allocations for 2024-25 to 2025-26 were agreed on the basis of
a flat cash allocation. In the budget outlook I have assumed flat cash
allocations across all three scenarios. 
1.11 The budget gap in the mid-range scenario after allowing for the current base
commitments, employee adjustments, non-pay inflation, cost and demand
pressures and not factoring in any previous savings decisions or future
potential options is an estimated gap over the five year period of £42.793m with
a gap of £11.481m in 2024-25. 
1.12 The measures to balance the budget over the next five years are as follows:
 Proposed increase to fees and charges of between 3% and 9% (6% mid-
range).
 Proposed increase to Council Tax (5% increase in 2024-25 in all scenarios,
reducing to a 3% increase in the mid-range and worst case scenarios in
future years with the best case scenario remaining at 5%).
 Policy savings already agreed by Council in February 2022. 
 Management/Operational savings already agreed by Council February
2023.
 Policy savings already agreed by Council in February 2023. 
1.13 In the mid-range scenario, the budget gap estimated over the five year period
2024-25 to 2028-29 is £25.700m with a gap of £7.580m in 2024-25.   
1.14 The budget gap in the best case scenario over the five years is £5.121m with a
gap of £4.848m in 2024-25 and in the worst case scenario, the budget gap
over the five years is £85.031m with a gap of £14.554m in 2024-25.  A
Page 126

Page 127

summary of all three scenarios is included within Appendix 1.  
1.15 It is recommended that the Policy and Resources Committee consider the
current estimated budget outlook position for the period 2024-25 to 2028-29. 
Page 127

Page 128

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 10 AUGUST 2023
BUDGET OUTLOOK 2024-25 TO 2028-29  
2. INTRODUCTION 
2.1 This report provides an update to the budget outlook covering the period 2024-
25 to 2028-29, reported to the Policy and Resources Committee on 11 May
2023. 
2.2 The budget outlook has been prepared using three different scenarios, best
case, worst case and mid-range.  Relatively small variations in assumptions can
lead to fairly significant changes in the outcome.  In the paragraphs that follow,
the mid-range outlook is shown, however, all three scenarios are detailed within
Appendix 1. 
3.  RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee consider the
current estimated budget outlook position for the period 2024-25 to 2028-29. 
4. DETAIL 
4.1 Funding 
Scottish Government Finance Settlement 
4.1.1  There are no changes to my previous assumptions around the level of future
Scottish Government funding. In my report in May, I advised that in considering
the assumptions relating to future years funding I have reflected on the funding
over the last 4 years after accounting for new policy commitments, and also the
spending review published in May 2022 which indicated that the total budget for
Local Government would remain flat cash until 2026-27. As a result of this the
assumptions in respect of future years Scottish Government funding range
between a 0.5% increase (best case) and a 0.5% reduction (worst case) with a
mid-range of 0%. 
4.1.2 The table below summarises the mid-range scenario estimates based on a flat
cash settlement. 
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
Estimated SG Funding 223,738 223,738 223,738 223,738 223,738 
Council Tax 
4.1.3 The Council Tax base for 2023-24 was set at £58.896m which reflected a 5%
Page 128

Page 129

inflation increase and 1.5% growth in the Council Tax base in 2023-24 and 0.5%
growth in future years as agreed by the Council on 23 February 2023. 
4.1.4 There are no changes to my previous assumptions around the growth in Council
Tax. It has been assumed that there will be a 0.5% growth in the mid-range
scenario for all years from 2024-25 (0.75% in best case and 0.25% in worst
case). 
4.1.5 
4.1.6
As reported in May, as part of the 2023-24 budget setting process a business
process review was undertaken of the Revenues and Benefits Service where
one of the outcomes was anticipated increased Council Tax recoveries equating
to £0.264m in 2024-25. Furthermore, the creation of the self-funded Counter
Fraud team also ensures minimum additional collections of £0.085m in 2024-25.
These additional Council Tax recoveries totalling £0.349m in 2024-25 are built
into the budget outlook. 
Within this report, I will present the budget gap, prior to any Member based
decisions and therefore at this stage in the report, the Council tax base is
assumed to remain at the same level as 2023-24.   
4.1.7 The table below summarises the estimated total funding in the mid-range
scenario. 
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
Estimated SG Funding 223,738 223,738 223,738 223,738 223,738
Council Tax Base 58,896 58,896 58,896 58,896 58,896
Council Tax Growth 294 590 887 1,186 1,486
Additional Council Tax
recoveries (para 4.1.5)
349 200 202 204 206
Total Estimated
Funding
283,277 283,424 283,723 284,024 284,326 
4.2 Base Budget 
4.2.1 The 2023-24 budget approved by Council on 23 February 2023 was
£284.536m.   
4.2.2 For future years, there are adjustments required to the base budget from
decisions by Council on 23 February 2023 and other adjustments as noted in
the table below: 
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
Base Budget 2023-24 284,536 284,536 284,536 284,536 284,536
Remove one-off release
of funding from the
Earmarked Reserves in
relation to the Capital
Fund
(1,536) (1,536) (1,536) (1,536) (1,536)
Adjust for one-off 2023-
24 cost pressures
(442) (442) (442) (442) (442)
Page 129

Page 130

Adjust for one-off 2022-
23 Management/
Operational savings
8 0 0 0 0
Adjust for one-off 2023-
24 Management/
Operational savings
2,581 2,581 2,581 2,581 2,581
Revised Base Budget 285,147 285,139 285,139 285,139 285,139 
4.3 Employee Cost Changes 
Pay Award 
4.3.1 
4.3.2
The SJC pay award for 2023-24 has still to be agreed and this may have an
impact on the base budget if the pay award is greater than the 3.5% allowed for
in the budget. The Scottish Government have agreed funding towards the SJC
2023-24 pay award equivalent to 2.5%, however negotiations are still ongoing. 
The Teachers pay award for 2023-24 has already been agreed (28 months deal
covering the period 1 April 2022 – 31 July 2024) and the current year budget is
sufficient to cover the deal, however future negotiations will have an impact on
the budget outlook. 
4.3.3 For future years, the mid-range scenario has been estimated at 2% on the basis
that it is expected that as inflation reduces it could take pressure off pay awards.
It also reflects what is affordable to Local Government and this 2% assumption
is currently in line with many other Councils assumptions. The best case
scenario also assumes a 2% increase (on the basis that the increase is not
likely to be less than this) and the worst case scenario assumes a 5% increase.
There remains a risk that the pay award could be higher and this will be
monitored and updated throughout the year if more information becomes
available. Every 1% over and above what is budgeted would add an additional
pressure of circa £1.5m 
Increments 
4.3.4 There are no changes to my previous assumption around the cost of employee
increments. It has been assumed that for future years, the best case is assumed
to be half of the previous year cost, for mid-range and worst case, assumes
equal to the cost in 2023-24 (£0.657m).   
4.3.5 The table below summarises the employee cost increases in the mid-range
scenario for Council services.  The employee cost increases relating to Social
Work within the Health and Social Care Partnership are summarised within
paragraph 4.6.3. 
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
Pay Award 3,049 6,159 9,331 12,567 15,867
Increments 657 1,314 1,971 2,628 3,285
Total Employee Cost
Changes
3,706 7,473 11,302 15,195 19,152 
Page 130

Page 131

4.4 Non-Pay Inflation 
4.4.1 Over the last few years, the Council have only included non-pay inflation within
the budget where it was deemed to be unavoidable or inescapable.  In terms of
the budget outlook, only unavoidable/inescapable non-pay inflation is built into
the best case and mid-range scenarios with a general inflation allowance over
and above this built into the worst case.    
4.4.2 Officers continue to review areas of non-pay inflation on an ongoing basis. The
principle of only budgeting for unavoidable/inescapable remains, however, it has
to be noted that in this current financial climate, some budgets with no inflation
allowed for are now stretched beyond the point of containing the cost within
budget and therefore the budget will now buy less than what it used to be able
to buy (so in effect, we will see some cuts as a result). 
4.4.3 When creating a budget outlook for future years, there is a risk that inflation
assumptions could change during the year.  Due to the current inflation
uncertainty, it would be prudent to include a contingency for other inflation
increases not included in the calculations.  A contingency allowance of £0.500m
is included within the worst case scenario and a £0.250m allowance included
within the mid-range scenario each year.  No contingency is included within the
best case scenario.  This contingency will either be required, reduced or
removed to reflect changing circumstances before the 2024-25 budget is set.   
4.4.4  The table below summarises the non-pay inflation in the mid-range scenario for
Council services with more detail available in Appendix 2.  The non-pay inflation
increases relating to Social Work within the Health and Social Care Partnership
are summarised within paragraph 4.6.3. 
Inflation Category 2024-25
Previous
estimates
(as at May
2023)
£000
2024-25
Updated
estimates
£000
Increase/
(Decrease)
£000
Utilities - Electricity, Gas, Oil, Water 644 831 187
Street Lighting Electricity 121 121 0
Vehicle Fuel 36 53 17
Central Repairs - Outside Contractors 68 68 0
Waste PPP/Landfill Tax 578 578 0
NPDO/HUB Schools 938 909 (29)
Community Pool Subsidies 95 95 0
Residential Schools 37 54 17
Pre-Primary Partner Providers 119 175 56
ICT 110 181 71
Catering Purchases and Milk 371 342 (29)
Insurance 53 83 30
Bitumen – Roads 17 24 7
Contingency for 250 250 0
Page 131

Page 132

unidentified/insufficient inflation
estimate
Total 3,437 3,764 327 
4.4.5  The most significant movement in non-pay inflation since last reported in May
2023 relates to energy costs. Over the last sixteen months the wholesale cost of
energy, particularly electricity, has risen significantly. During 2022-23, the
Council was largely protected from the increase in prices as it had forward
purchased its energy needs before prices increased. However, having reached
the end of the period this covered, the Council is now exposed to the current
market rates which are significantly higher. The non-pay inflation figures have
been adjusted to account for early estimates of the potential impact on the
Council however this will be monitored throughout the year and updated
accordingly. 
4.4.6 The cumulative inflation for years 2025-26 to 2028-29 is noted in the table below
and is based on future years estimates of inflation at this point it time, however,
due to the volatility of inflation recently it is very difficult to predict and the
estimates will be kept under close review.   
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
Unavoidable/Inescapable 6,367 9,145 12,111 15,280
Total Non-Pay Inflation 6,367 9,145 12,111 15,280 
4.5 Cost and Demand Pressures 
4.5.1 
4.5.2 
Over the last few years, services have worked on the basis of having to contain
any cost and demand pressures within current resources, however, there are a
number of cost and demand pressures already identified for Council services
which were reported as part of the budget in February 2023.  Since the Policy
and Resources Committee on 11 May 2023 the following changes have been
made to the cost and demand pressures: 
 Amended - ASN Support increased to reflect continued growth in demand
 New - Repairs and Maintenance costs for new Helensburgh Waterfront
Leisure Complex
 New - Depots – shortfall in previously agreed saving due to delays
 New - Public Transport Fares – shortfall in previously agreed saving due to
reduction in passenger numbers
 New – Insurance premiums have risen higher than previous forecasts 
As mentioned in paragraph 4.4.5, the forward purchasing of the Council’s
energy needs for 2022-23 largely protected the Council from the significant
increases in energy costs, particularly electricity. As the Council re-contracts for
its energy now and is exposed to significantly higher market rates, the increase
in prices may exceed the existing 2023-24 budget and a cost pressure may be
required. This will be monitored closely and updated as more information
Page 132

Page 133

becomes available throughout the year.
4.5.3  As with inflation, when creating a budget outlook beyond one year, there is a
risk that unknown cost and demand pressures will emerge that have not been
included within the outlook.  It is suggested that a £0.250m general allowance
for this is included within the best case scenario, £0.500m within the mid-range
scenario and a £1m allowance included within the worst case scenario each
year. 
4.5.4 The cost pressures are detailed in appendix 3 and are summarised in the table
below and will be subject to review during the financial year.   
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
Universal Credit – HB
Admin Grant
40 80 120 160 200
IFRS16 Implementation
Software
18 18 18 18 18
ASN Support 198 400 608 822 822
SEEMiS Membership
Fees
2 4 7 7 7
Sustainable rate for
partner providers
327 327 327 327 327
NPDO/HUB Schools –
2023-24 inflation
480 480 480 480 480
Election costs 0 0 0 300 0
Leisure SLA’s – 2023-24
inflation
10 10 10 10 10
Repairs and Maintenance
– Helensburgh Waterfront
Leisure Complex
105 105 105 105 105
Depots – saving shortfall 108 108 108 108 108
Public Transport – saving
shortfall
29 29 29 29 29
Waste (107) 87 (242) 128 128
Compliance with BMW
Ban
0 608 2,433 2,433 2,433
Waste PPP Contracts –
2023-24 inflation
255 255 255 255 255
Local Development Plan 50 0 50 0 0
Insurances 126 126 126 126 126
Allowance for pressures in
future years
500 1,000 1,500 2,000 2,500
Total Cost and Demand
Pressures 
2,141 3,637 5,934 7,308 7,548 
4.5.5 The cost and demand pressures relating to Social Work within the Health and
Social Care Partnership are summarised within paragraph 4.6.3. 
4.6 Health and Social Care Partnership 
4.6.1 The Council, at the budget meeting on 23 February 2023, agreed a base
Page 133

Page 134

allocation to the HSCP of £76.253m for 2023-24 as well as indicative flat cash
allocations for 2024-25 to 2025-26.    
4.6.2 In the budget outlook, I have assumed flat cash allocations across all scenarios.
These are only assumptions and it will be a matter for Council to consider as
part of the budget process next year.   
4.6.3 Social Work services have already identified a number of cost and demand
pressures and these are summarised below and included within Appendix 4 for
information purposes.  It is expected that the HSCP absorb their cost and
demand pressures from their funding allocation.  Note that these only extend to
three years rather than the five years within this Council budget outlook.   
2024-25
£000
2025-26
£000
2026-27
£000
Pay Inflation 691 1,396 2,115
Pay Increments 152 304 456
Non-Pay Inflation 3,997 8,055 12,307
Care Services for Younger Adults 460 929 1,409
Adult Services - Supported Living 55 110 110
Continuing Care for Looked After
Children
0 250 500
Unknown Cost and Demand
Pressures
500 1,000 1,500
Total Cost Increase estimates
for Social Work
5,855 12,044 18,397 
4.7 Estimated Budget Gap PRIOR to Measures to Balance the Budget 
4.7.1 The budget gap in the mid-range scenario after allowing for the current base
commitments, employee adjustment, non-pay inflation and cost and demand
pressures is summarised in the table below.  This is the budget gap prior to
factoring in any previous savings decisions or potential options towards
balancing the budget.     
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
Base Budget 285,147 285,139 285,139 285,139 285,139
Employee Cost Changes 3,706 7,473 11,302 15,195 19,152
Non-Pay Inflation 3,764 6,367 9,145 12,111 15,280
Cost and Demand
Pressures
2,141 3,637 5,934 7,308 7,548
Total Estimated
Expenditure
294,758 302,616 311,520 319,753 327,119
Estimated Funding 283,277 283,424 283,723 284,024 284,326
Estimated Budget
Surplus / (Gap)
Cumulative
(11,481) (19,192) (27,797) (35,729) (42,793) 
4.8  Measures to Balance the Budget 
Page 134

Page 135

4.8.1 In 2023-24 a general inflationary increase of 6% was applied to fees and
charges.  For the budget outlook a range of between 3% (worst case) and 9%
(best case) with a mid-range of 6% has been included.  
4.8.2 Some of the policy options were agreed at the Council meeting on 23 February
2023 that impacted on 2024-25 and beyond.   These are now factored into the
budget outlook, reducing the budget gap. 
4.8.3 In terms of Council Tax, a 5% increase has been assumed across all scenarios
for 2024-25 on the basis that the majority of Councils increased their Council
Tax by at least 5% in 2023-24 and this is something that Council could consider
for another year. From 2025-26 the assumption on the Council Tax increase has
been reduced to 3% in the mid-range and worst case scenarios and left at 5%
within the best case scenario. It will be a matter for Council to decide the level of
Council Tax increase.   
4.8.4 The table below summarises the proposed measures to balance the budget in
the mid-range scenario.
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
Fees and Charges
Increase
848 1,696 2,544 3,392 4,240
Council Tax Increase 2,960 4,848 6,795 8,811 10,896
Policy Savings agreed
February 2022
3 3 3 3 3
Management/Operational
Savings agreed February
2023
45 80 80 80 80
Policy Savings agreed
February 2023
45 293 769 1,405 1,874
Total Measures to
Balance the Budget
3,901 6,920 10,191 13,691 17,093
4.9 Estimated Budget Gap AFTER Measures to Balance the Budget
4.9.1 The table below summarises the estimated budget gap in the mid-range
scenario.
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
Estimated Budget Gap
Prior to Measures to
Balance Budget
(11,481) (19,192) (27,797) (35,729) (42,793)
Savings Measures 3,901 6,920 10,191 13,691 17,093
Estimated Budget
Surplus / (Gap)
Cumulative
(7,580) (12,272) (17,606) (22,038) (25,700)
Estimated Budget
Surplus / (Gap) In Year
(7,580) (4,691) (5,334) (4,432) (3,662)
Page 135

Page 136

4.9.2 In the mid-range scenario, the budget gap estimated over the five year period
2024-25 to 2028-29 is £25.700m with a gap of £7.580m in 2024-25.   
4.9.3 The budget gap in the best case scenario over the five years is £5.121m with a
gap of £4.848m in 2024-25 and in the worst case scenario, the budget gap over
the five years is £85.031m with a gap of £14.554m in 2024-25.  A summary of
all three scenarios is included within Appendix 1. 
4.9.4 The changes from the previous anticipated outlook reported to the Policy and
Resources Committee on 11 May 2023 are summarised in the table below: 
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
Previously reported
budget surplus / (gap)
Cumulative
(6,762) (11,240) (16,219) (20,287) (23,795)
Adjustment to Non-Pay
Inflation
(327) (470) (617) (767) (921)
Cost & Demand
Pressures – ASN
Support
(123) (194) (402) (616) (616)
Cost Pressure – Repairs
& Maintenance
Helensburgh Waterfront
Leisure Complex
(105) (105) (105) (105) (105)
Cost Pressure – Depots
Saving Shortfall
(108) (108) (108) (108) (108)
Cost Pressure – Public
Transport Saving
Shortfall
(29) (29) (29) (29) (29)
Cost Pressure –
Insurance Costs
(126) (126) (126) (126) (126)
Revised Budget
Surplus / (Gap)
Cumulative
(7,580) (12,272) (17,606) (22,038) (25,700) 
5. CONCLUSION 
5.1 In the mid-range scenario, the budget gap estimated over the five year period
2024-25 to 2028-29 is £25.700m with a gap of £7.580m in 2024-25.   Council
officers are continuing to explore savings options during 2023-24 and these will
be presented to members at a future date to help balance the budget in future
years. 
5.2  This is a very challenging budget outlook position and the level of Scottish
Government grant and the pay award are the two assumptions that could alter
the figures significantly.  Both will be kept under close review and the budget
outlook updated as and when further information becomes available.   
Page 136

Page 137

6. IMPLICATIONS 
6.1 Policy -  Sets out the budget outlook that provides the financial
envelope for policy decisions.
6.2 Financial -  Sets best, worst and mid-range scenarios in respect of
the budget outlook.  The medium to longer term
financial strategy is being updated and the Council are
actively continuing to pursue opportunities to mitigate
against future budget gaps. 
6.3 Legal -  None directly from this report but Council will need to
balance the budget. 
6.4 HR -  None directly from this report but there is a strong link
between HR and budgets.
6.5 Fairer Scotland Duty - See below
6.5.1 Equalities None directly from this report but any proposals to
address the estimated budget gap will need to consider
equality issues.
6.5.2 Socio Economic Duty None directly from this report but any proposals to
address the estimated budget gap will need to consider
socio economic issues.
6.5.3 Islands Duty None directly from this report but any proposals to
address the estimated budget gap will need to consider
any island specific issues. 
6.6 Climate Change The Council is committed to addressing climate change
and reviews how Services are delivering this on an
ongoing basis within the available budget resources.
6.7 Risk -  None directly from this report but any proposals to
address the estimated budget gap will need to consider
risk.
6.8 Customer Service - None directly from this report but any proposals to
address the estimated budget gap will need to consider
customer service. 
Kirsty Flanagan
Executive Director/Section 95 Officer
14 July 2023 
Policy Lead for Finance and Commercial Services:  Councillor Gary Mulvaney 
APPENDICES: 
Appendix 1 – Budget Outlook, Best, Worst and Mid-Range Scenarios
Appendix 2 – Non Pay Inflation
Appendix 3 – Cost and Demand Pressures (Council Services)
Appendix 4 – Cost and Demand Pressures (Social Work) 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 137

Page 138

BUDGET OUTLOOK 2024-25 to 2028-29 APPENDIX 1
POLICY AND RESOURCES COMMITTEE - 10 AUGUST 2023
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2024-25
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
Base Budget 284,536 284,536 284,536 284,536 284,536 284,536 284,536 284,536 284,536 284,536 284,536 284,536 284,536 284,536 284,536
Base Budget Adjustments 611 603 603 603 603 611 603 603 603 603 611 603 603 603 603
Revised Base Budget 285,147 285,139 285,139 285,139 285,139 285,147 285,139 285,139 285,139 285,139 285,147 285,139 285,139 285,139 285,139
Pay Award 3,049 6,159 9,331 12,567 15,867 3,049 6,159 9,331 12,567 15,867 7,622 18,892 30,725 43,150 56,196
Pay Increments 329 658 986 1,315 1,643 657 1,314 1,971 2,628 3,285 657 1,314 1,971 2,628 3,285
Adjustment to Employee Base 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Employee Cost Changes (Council Services) 3,378 6,817 10,317 13,882 17,510 3,706 7,473 11,302 15,195 19,152 8,279 20,206 32,696 45,778 59,481
Non-Pay Inflation - Council Services 3,307 5,671 8,184 10,857 13,701 3,764 6,367 9,145 12,111 15,280 3,970 8,665 13,313 18,180 23,283
Housing Benefits Admin Grant 40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
IFRS16 Implementation 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
ASN Support 198 400 608 822 822 198 400 608 822 822 198 400 608 822 822
SEEMIS Membership Fees 2 4 7 7 7 2 4 7 7 7 2 4 7 7 7
Sustainable Rate for Partner Providers 327 327 327 327 327 327 327 327 327 327 327 327 327 327 327
NPDO and HUB Schools 2023/24 inflation 480 480 480 480 480 480 480 480 480 480 480 480 480 480 480
Election Costs 0 0 0 250 0 0 0 0 300 0 0 0 0 350 0
Leisure SLA's 2023/24 inflation 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
Repairs and Maintenance - Helensburgh Waterfront Leisure Complex 105 105 105 105 105 105 105 105 105 105 105 105 105 105 105
Depots - saving shortfall 108 108 108 108 108 108 108 108 108 108 108 108 108 108 108
Public Transport Fares - saving shortfall 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29
Waste (117) 9 (263) 37 37 (107) 87 (242) 128 128 (97) 165 (221) 218 218
Compliance with BMW Ban 0 0 462 925 925 0 608 2,433 2,433 2,433 0 608 2,433 2,433 2,433
Waste PPP Contract 2023/24 Inflation 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255
Planning (Local Development Plan) 50 0 50 0 0 50 0 50 0 0 50 0 50 0 0
Insurances 126 126 126 126 126 126 126 126 126 126 126 126 126 126 126
Allowance for Cost and Demand Pressures Future Years 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500 1,000 2,000 3,000 4,000 5,000
Total Cost and Demand Pressures 1,881 2,451 3,192 4,659 4,699 2,141 3,637 5,934 7,308 7,548 2,651 4,715 7,455 9,448 10,138
Total Estimated Expenditure PRIOR to measures to balance the budget 293,713 300,078 306,832 314,537 321,049 294,758 302,616 311,520 319,753 327,119 300,047 318,725 338,603 358,545 378,041
Scottish Government Grant 224,846 225,971 227,101 228,237 229,378 223,738 223,738 223,738 223,738 223,738 222,630 221,517 220,409 219,307 218,211
Council Tax 59,687 59,983 60,433 60,887 61,344 59,539 59,686 59,985 60,286 60,588 59,394 59,397 59,549 59,702 59,856
Total Funding 284,533 285,954 287,534 289,124 290,722 283,277 283,424 283,723 284,024 284,326 282,024 280,914 279,958 279,009 278,067
Budget Surplus / (Gap) PRIOR to measures to balance the budget (9,180) (14,123) (19,298) (25,413) (30,327) (11,481) (19,192) (27,797) (35,729) (42,793) (18,023) (37,811) (58,645) (79,536) (99,974)
Measures to Balance the Budget:
Fees and Charges 1,272 2,544 3,816 5,088 6,360 848 1,696 2,544 3,392 4,240 424 848 1,272 1,696 2,120
Council Tax Increase 2,967 6,105 9,422 12,927 16,630 2,960 4,833 6,771 8,777 10,852 2,952 4,816 6,741 8,728 10,779
Council Tax Increase (Growth element) 0 59 122 188 259 0 15 24 34 44 0 30 48 67 87
Policy savings agreed February 2022 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Management/Operational Savings agreed Feb 2023 45 80 80 80 80 45 80 80 80 80 45 80 80 80 80
Policy Savings agreed February 2023 45 293 769 1,405 1,874 45 293 769 1,405 1,874 45 293 769 1,405 1,874
Total Measures to Balance the Budget 4,332 9,084 14,212 19,691 25,206 3,901 6,920 10,191 13,691 17,093 3,469 6,070 8,913 11,979 14,943
Budget Surplus / (Gap) Cumulative AFTER measures to balance the budget (4,848) (5,039) (5,086) (5,722) (5,121) (7,580) (12,272) (17,606) (22,038) (25,700) (14,554) (31,741) (49,732) (67,557) (85,031)
Budget Surplus / (Gap) In Year AFTER measures to balance the budget (4,848) (191) (47) (636) 600 (7,580) (4,691) (5,334) (4,432) (3,662) (14,554) (17,188) (17,990) (17,825) (17,474)
Best Case Scenario Mid-Range Scenario Worst Case Scenario
Page 138

Page 139

NON-PAY INFLATION (COUNCIL) Appendix 2
Service Category Basis of Inflation Inflation
Percentage
Mid Range
2023/24
Council Wide Electricity Due to current market condition for electricity 16% increase mid range, with a 0.5% tolerance for best and worst case. 16.00% 671,989
Council Wide Gas Due to current market condition for gas 15% increase with mid range based on latest information available from Property Services,
with a 0.5% tolerance for best and worst case.
15.00% 111,310
Council Wide Heating Oils Due to current market condition for gas 8.70% increase with mid range reflecting May 2023 CPI rate, with a 0.5% tolerance for best
and worst case.
8.70% 34,825
Council Wide Solid Fuel Based on Bank of England Monetary Policy Committee CPI Forecast for 2024 Q1, with a 0.5% tolerance for best and worst case. 4.40% 12,671
Council Wide Vehicle Fuel Based on Bank of England Monetary Policy Committee CPI Forecast for 2024 Q1, with a 0.5% tolerance for best and worst case. 4.40% 52,682
Council Wide Central Repairs - Outside Contractors Based on labour and materials costs survey data from the Royal Institute of Chartered Surveyors (RICS) and information from the
property team on the typical allocation of their costs between labour and materials.
3.39% 68,225
Council Wide Insurances Based on Bank of England Monetary Policy Committee CPI Forecast for 2024 Q1, with a 0.5% tolerance for best and worst case. 4.40% 83,328
Council Wide Contingency for unidentified/insufficient inflation estimate £250k built in to mid-range and £500k built in to worst case scenario 250,000
1,285,030
Education Pre-Primary Partner Provider Uplift Based on Bank of England Monetary Policy Committee CPI Forecast for 2024 Q1, with a 0.5% tolerance for best and worst case. 4.40% 174,527
Education External School Placements Based on Bank of England Monetary Policy Committee CPI Forecast for 2024 Q1, with a 0.5% tolerance for best and worst case. 4.40% 53,796
Commercial Services Catering Purchases Based on Office for National Statistics Inflation Rate for Food and Non-Alcoholic Beverages at May 2023, with a 0.5% tolerance for
best and worst case .
18.40% 342,949
Legal & Regulatory Support Leisure SLA-MAKI/Islay Pools Based on Bank of England Monetary Policy Committee CPI Forecast for 2023 Q2, with a 0.5% tolerance for best and worst case. 8.20% 15,707
Legal & Regulatory Support Leisure SLA-Atlantis Based on RPI at September 2022 with a 0.5% tolerance in the best and worst case scenarios. 12.64% 78,857
Legal & Regulatory Support NPDO-Variable Element Based on Bank of England Monetary Policy Committee CPI Forecast for 2023 Q2, with a 0.5% tolerance for best and worst case. 8.20% 684,863
Legal & Regulatory Support NPDO-Utilities Rebate Based on Bank of England Monetary Policy Committee CPI Forecast for 2023 Q2, with a 0.5% tolerance for best and worst case. 8.20% -25,908
Legal & Regulatory Support NPDO-Electricity Due to current market condition for electricity 16% increase mid range, with a 0.5% tolerance for best and worst case. 16.00% 93,528
Legal & Regulatory Support NPDO-Gas Due to current market condition for gas 15% increase with mid range based on latest information available from Property Services,
with a 0.5% tolerance for best and worst case.
15.00% 35,844
Legal & Regulatory Support NPDO-Heating Oil Due to current market condition for gas 8.70% increase with mid range reflecting May 2023 CPI rate, with a 0.5% tolerance for best
and worst case.
8.70% 8,979
Legal & Regulatory Support NPDO-LPG Based on Bank of England Monetary Policy Committee CPI Forecast for 2024 Q1, with a 0.5% tolerance for best and worst case. 4.40% 3,953
Legal & Regulatory Support HUB-Variable Element Based on Bank of England Monetary Policy Committee CPI Forecast for 2023 Q2, with a 0.5% tolerance for best and worst case. 8.20% 107,189
1,574,284
Customer and Support Services ICT Estimate based on feedback from ICT staff in relation to significant price increases for ICT services and equipment. 10.00% 180,886
Roads and Infrastructure Waste PPP-Private Contractor Inflation Based on 85% of the Bank of England Monetary Policy Committee CPI Forecast for 2023 Q2, with a 0.5% tolerance for best and worst
case.
7.00% 509,360
Roads and Infrastructure Waste PPP-Central Government Inflation Based on Landfill Tax increase between 22/23 and 23/24 with a 0.5% tolerance for best and worst case. Will be updated once the
2024/25 rate is published.
3.55% 68,777
Roads and Infrastructure Roads - Bitumen for Road Surfacing Based on Bank of England Monetary Policy Committee CPI Forecast for 2024 Q1, with a 0.5% tolerance for best and worst case. 4.40% 24,411
Roads and Infrastructure Electricity - Street Lighting Due to current market condition for electricity 16% increase mid range, with a 0.5% tolerance for best and worst case. 16.00% 120,958
904,392
3,763,706
Council Wide Total
Executive Director Douglas Hendry - Total
Executive Director Kirsty Flanagan - Total
Total Non-Pay Inflation in the Mid Range
Page 139

Page 140

COUNCIL COST AND DEMAND PRESSURES 2024-25 to 2028-29
Department Service Cost/Demand Pressure 2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2028-29
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2028-29
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2028-29
£,000
Executive Director -
Douglas Hendry
Education The demand for ASN support in Argyll and Bute has continued to grow with a significant
increase in, and early identification of children and young people presenting with complex
additional support needs, including mental health difficulties which manifests often in
dysregulated behaviours.  It is anticipated that growth continues over the next 5 years
however the extent of this growth is difficult to determine.  Scottish Government statistics
show that the number of pupils identified with ASN has increased markedly since 2010 and
there continue to be year on year increases. These increases are likely due to continue as we
see the impact of the Covid 19 pandemic on children and young people who were born from
2020 onwards and as we work with partners to streamline assessment processes which help
us to understand need more thoroughly.  Scottish Government statistical datasets show that
the percentage of school roll in mainstream schools of pupils with ASN has increased by
approximately 3% year on year.  Within many authorities, this means increased numbers of
children accessing specialist provision. As Argyll and Bute do not have equitable access to
Specialist provision in all areas, the cost pressure associated with offering appropriate
support within our local schools continues to increase in line with need.
198 400 608 822 822 198 400 608 822 822 198 400 608 822 822
Executive Director -
Douglas Hendry
Education The SEEMiS group, provider of the Council's Education Management Information System,
recently reviewed their long term financial plan and refreshed it to cover the period 2021/22
to 2025/26.  As a result of this exercise there were implications on Membership fees with a
cost pressure on the Education service arising from financial year 2023/24.  Indicative
membership fees were provided for financial years 2021/22 to 2022/23 and these have been
factored in accordingly.
2 4 7 7 7 2 4 7 7 7 2 4 7 7 7
Executive Director -
Douglas Hendry
Education The Council has had a requirement to deliver 1140 hours of Early Learning and Childcare
from August 2021. The Council has been notified that the ring fenced funding will be reduced
by £1.124m from 2022-23. Also, as part of the 1140 expansion programme, the Scottish
Government 'Funding Follows the Child' guidance, requires local authorities to set a rate
locally that is paid to funded providers in the private and third sectors, including
childminders, to deliver the funded entitlement that allows them to deliver a high quality
ELC experience for all children. This rate should be sustainable and reflect national policy
priorities, including funding to enable payment of the real Living Wage to all childcare
workers delivering the funded entitlement and have a margin for re-investment built in. The
service has worked hard to mitigate the effects of this and has reduced expenditure as far as
possible.  However there remains a funding gap, the service are able to cover the over spend
for 2022-23 and 2023-24 from carry forwards so the cost pressure is requested from 2024-25
onwards. The service will continually review their plans looking for efficiencies where
possible.
327 327 327 327 327 327 327 327 327 327 327 327 327 327 327
Executive Director -
Douglas Hendry
Education Adjustment to the base budget for the Schools NPDO and Hub Schools contracts due to the
rate of inflation at February 2023 being higher than forecast when the 2023/24 budget was
prepared.
480 480 480 480 480 480 480 480 480 480 480 480 480 480 480
Executive Director -
Douglas Hendry
Legal and Regulatory
Services
Estimated cost (to be borne by the Council)  of carrying out local Government elections in
May 2027 (and in financial year 2027/28). Operating approx. 100 polling stations and
carrying out poll and count for 11 Multi member wards – requiring 11 separate counts
0 0 0 250 0 0 0 0 300 0 0 0 0 350 0
Executive Director -
Douglas Hendry
Commercial Services Adjustment to the base budget for the swimming pools service level agreements due to the
rate of inflation at February 2023 being higher than forecast when the 2023/24 budget was
prepared.
10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
Executive Director -
Douglas Hendry
Commercial Services There is an ongoing need for the Council to manage the maintenance and repair of its
buildings.  Now that the new Helensburgh Waterfront Leisure Complex is operational there
are additional pressures on this budget for maintenance and inspection of fabric, mechanical
systems and electrical systems for this new asset.  The cost of maintenance and inspection
over the next 9 years is estimated at £939k, averaging £105k per annum. 
105 105 105 105 105 105 105 105 105 105 105 105 105 105 105
Best Case Mid Range Scenario Worst Case
APPENDIX 3
Page 140

Page 141

COUNCIL COST AND DEMAND PRESSURES 2024-25 to 2028-29
Department Service Cost/Demand Pressure 2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2028-29
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2028-29
£,000
2024-25
£,000
2025-26
£,000
2026-27
£,000
2027-28
£,000
2028-29
£,000
Best Case Mid Range Scenario Worst Case
APPENDIX 3
Executive Director -
Kirsty Flanagan
Financial Services Universal Credit “Full” Service went live in Sept 2018, but managed migration has been
deferred to 2021 and will not be completed until 2024. The DWP will reduce the Housing
Benefit Administration Subsidy they pay to the Council as some claimants come off of
Housing Benefit processed by Council staff and go onto Universal Credit processed by the
DWP.  The Council’s caseload has reduced marginally since implementation of Universal
Credit but it is hard to predict just how quickly the rest of the working age caseload will
migrate from Housing Benefit to Universal Credit between now and 2024.  These figures
represent our best estimates at this time.
40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
Executive Director -
Kirsty Flanagan
Financial Services Implementation of new IFRS16 system to manage leases and accounting requirements of
the IFRS Finance Leases accounting standard.
18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
Previously agreed saving from 2018-19 for Depots (TB07) is now not fully achievable with a
shortfall of £107,500.  Delays in progressing the Depot Rationalisation programme and
limited capital investment available has resulted in the savings not being realised.  Cost
pressure to remove this saving with further work ongoing on the Depot Rationalisation
programme which will hopefully generate further savings in the future.
108 108 108 108 108 108 108 108 108 108 108 108 108 108 108
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
Previously agreed saving from 2021-22 for Public Transport Fare increases (R&I17) is now not
fully achievable with a shortfall of £29K.  Report provided from Consultants Stantec outlining
the proposed saving did not materialise due to a reduction in passenger numbers using local
public transport.
29 29 29 29 29 29 29 29 29 29 29 29 29 29 29
Executive Director -
Kirsty Flanagan
Waste Additional costs derived from the current waste model. Note that the treatment of waste
going forward has not been fully costed due to uncertainty as to how the council will deal
with the Bio Municipal Waste ban and the Deposit Return Scheme. Pressure has increased
due to an updated waste model.
(117) 9 (263) 37 37 (107) 87 (242) 128 128 (97) 165 (221) 218 218
Executive Director -
Kirsty Flanagan
Waste Achieving compliance with ban on biodegradable municipal waste in 2025.  This is the
estimated revenue costs from potential scenarios, remaining in or coming out of the current
waste PPP contract.  Coming out of the Waste PPP contract would create an additional one-
off cost.  There are also capital cost implications that are not included within these
estimates.  Due to the complexity of the model, estimates are subject to change. The best
case scenario reflects option 4 detailed in the report to the Environment, Development and
Infrastructure Committee on 01/12/2022. The mid range and worst case scenarios reflects
option 3 included in the same report and take into account the risk that the SG will not agree
a derogation.
0 0 462 925 925 0 608 2,433 2,433 2,433 0 608 2,433 2,433 2,433
Executive Director -
Kirsty Flanagan
Waste Adjustment to the base budget for the Waste PPP contract due to the rate of inflation at
February 2023 being higher than forecast when the 2023/24 budget was prepared.
255 255 255 255 255 255 255 255 255 255 255 255 255 255 255
Executive Director -
Kirsty Flanagan
Planning Local development plan will require to be done under the new Planning legislation which is a
revised process from the current one and will have a 10 year life. The new process has 2
stages where there is likely to be a cost pressure - a gate check followed by an examination
some time later.
50 0 50 0 0 50 0 50 0 0 50 0 50 0 0
Council Wide Council Wide Rightsize Council Insurance Budget - Insurance premiums have risen higher than previous
inflationary forecasts due to changes in law,  Increase in building values, higher contractor
costs for building works, repairs and higher component parts for cars.
126 126 126 126 126 126 126 126 126 126 126 126 126 126 126
Council Wide Council Wide General provision for unidentified Cost and Demand Pressures 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500 1,000 2,000 3,000 4,000 5,000
TOTAL 1,881 2,451 3,192 4,659 4,699 2,141 3,637 5,934 7,308 7,548 2,651 4,715 7,455 9,448 10,138
Page 141

Page 142

SOCIAL WORK COST AND DEMAND PRESSURES - 2024-25 to 2026-27 APPENDIX 4
Service Cost/Demand Pressure 2024-25
£000
2025-26
£000
2026-27
£000
2024-25
£000
2025-26
£000
2026-27
£000
2024-25
£000
2025-26
£000
2026-27
£000
All Social Work Estimated Pay inflation reflecting a best case and mid-range of 2% and worst case
of 5%.
691 1,396 2,115 691 1,396 2,115 1,729 3,544 5,450
All Social Work Estimated Pay increments, best case is that 50% of the incremental changes based
on 2023/24 are absorbed and in the mid-range and worst case, the increase is in
line with the increase in 2023/24.
76 152 228 152 304 456 152 304 456
All Social Work Non-pay inflation, best and worst case based on unavoidable/inescapable inflation
and worst case.
3,429 6,902 10,509 3,824 7,739 11,842 4,219 8,584 13,194
All Social Work Non-pay inflation impact of payroll inflation on NHS posts which are recharged to
Social Work.
160 287 420 173 316 465 187 344 510
Adult Care Younger Adults Demand Growth (Excluding Physical Disability): There has been
continuing increase in demand for care and support services for profoundly
disabled younger adults (ie under 65) whose parents have historically provided
care but are no longer able to.  The best case assumes a 1% increase in spending
reflecting the limited service capacity in the area, the mid-range reflects 2% growth
and the worst case reflects 3% growth.
194 390 588 388 784 1,189 582 1,183 1,803
Adult Care Younger Adults Demand Growth - Physical Disability: There has been continuing
increase in demand for care and support services for profoundly disabled younger
adults (ie under 65) whose parents have historically provided care but are no
longer able to.  The best case assumes a 1% increase in spending reflecting the
limited service capacity in the area, the mid-range reflects 2% growth and the
worst case reflects 3% growth.
36 72 109 72 145 220 107 218 332
Adult Care Mental Health Budget Adjustment - The Mental Health Supported Living and
Residential budgets are carrying a recurring unbudgeted commitment. To address
this situation, it is proposed to continue to realign the budget over 2024-25 and
2025-26 whilst also reviewing cases and redesigning services. The adjustment will
be reviewed annually to reflect spending reductions delivered as well as any
changes to funding and practice resulting from the implementation of the
Independent Review of Adult Social Care.
55 110 110 55 110 110 55 110 110
Children and
Families
Continuing Care demand for Looked After young people who are cared for by the
HSCP. The best case scenario is that the expected additional demand can be
funded from within existing resources as a result of planned improvements to the
service delivery model (eg shift away from high cost external residential care to
local foster and kinship care), the mid case reflects that additional demand in
24/25 be funded from existing resource with £250k per annum thereafter and the
worst case reflects £250k per annum.
0 0 0 0 250 500 250 500 750
All Social Work Allowance for unknown cost and demand pressures which could arise. The best
case assumes unknown pressures totalling £250k per annum, the mid range £500k
per annum and the worst case £750k per annum.
250 500 750 500 1,000 1,500 750 1,500 2,250
TOTAL COST AND DEMAND PRESSURES 4,891 9,809 14,829 5,855 12,044 18,397 8,031 16,287 24,855
Best Case Mid Range Worst Case
Page 142

Page 143

1 
ARGYLL AND BUTE COUNCIL                  POLICY AND RESOURCES COMMITTEE 
ASSET MANAGEMENT BOARD      10th August 2023 
CAPITAL INVESTMENT STRATEGY 2023 - 2038 
1.0 EXECUTIVE SUMMARY
1.1. The Argyll and Bute Outcome Improvement Plan (ABOIP) is being refreshed in 2023 it is
important to prioritise investment that meets the changing strategic ambitions of our
organisation, region and wider community.  Also, inflation across many sectors over recent
years has been at a record high so labour, materials and goods are costing more than ever,
requiring us to prioritise spend on our most important activities.  This is at the same time as
public sector budgets in real terms are being reduced to meet national fiscal challenges.  We
are committed to delivering high quality services to our communities and stimulating and
growing the population and economy of Argyll and Bute.  We aim to set out a clear and strong
direction for the Council which sets the scene for our capital investment ambition in assets and
infrastructure.
1.2. This report introduces and seeks approval for the Council’s new Capital Investment Strategy
and outlines the approach for sound management of our assets.  Our Capital Investment
Strategy considers how we can deal with short to medium term financial uncertainty by taking a
longer term view of our capital investment and how this can be put to best effect to meet the
needs of the area.  This is demonstrated in our corporate strategies and plans including our
£70m Rural Growth Deal (RGD) which is key to stimulating economic growth, connecting our
communities, growing businesses that do well and increasing skills in our area.  Beyond the
RGD, the competitive nature and bid style for grant funding awards from both Scottish and UK
Government has become normal practice and it is essential our Council sets a framework to
prioritise capital investment that best supports our ambitions – in essence a pipeline of projects
is required to align to the ABOIP or other corporate aims to ensure there is targeted deployment
of resources to achieve most efficient use of resource and limited capital and revenue.  Work is
currently underway to build a framework and consistent approach to mandating, recording and
monitoring projects as they move through the various stages of a project lifecycle (or the
pipeline). 
1.3. It is clear that we cannot achieve our investment ambition on our own, we need to work
collaboratively with communities and other stakeholders to make sure that we understand local
needs and that we can deliver what we promise.   Planning for the longer term and having
ambition will also support the alignment of public funding with other organisations for the benefit
of our region.   We have to be realistic about what we can achieve with our known available
resources, which is why we are working with partners to deliver economic and infrastructure
improvements. By working with partners, we are ensuring that our resources can sit alongside
and where available leverage external funding opportunities to optimise the benefits for our area. 
We need to invest for longer term benefit and address ongoing challenges such as climate
change and digital connectivity but always be mindful that any investment must be undertaken
in a prudent, affordable and sustainable manner.
1.4. The Council’s strategic and financial management processes are essential for achieving
Page 143 Agenda Item 6

Page 144

2 
financial resilience in uncertain times. We must use our property, land and available resources
wisely and ensure that we attract appropriate external funding to our area. Our Capital
Investment Strategy will continue to evolve and be updated as strategic influences change over
time, as new challenges and opportunities present themselves and as the delivery of our
investment ambition is realised. 
1.5. RECOMMENDATIONS
The Policy & Resources Committee are invited to note and recommend to Council approval
of:-
1) The Council’s new Capital Investment Strategy contained at Appendix A.   
2.0 IMPLICATIONS
2.1 Policy – The new Capital Investment Strategy sets out a long term strategic vision for
management of Council assets for 15 year period based on sound financial planning and
prioritisation
2.2 Financial - As set out in the Report and Capital Investment Strategy based on prudent and
prioritised use of resources 
2.3  Legal – Requirement to fulfil obligations in relation to responsible use of public resources
2.4  HR - No impacts.
2.5  Fairer Scotland Duty:
2.5.1 Equalities – No impact
2.5.2 Socio-economic Duty – Part of delivery of capital projects
2.5.3 Islands – No specific impact
2.6 Climate Change – New Capital Investment Strategy specifically looks to strengthen
investment in climate change activity over next 15 years and route to net zero
2.7 Risk – Confirming up to date and clear strategy will reduce risk
2.8  Customer Service – None. 
Douglas Hendry - Executive Director with responsibility for Commercial Services 
Councillor Gary Mulvaney - Policy Lead for Finance and Commercial Services 
21st July 2023 
Page 144

Page 145

3 
For further information contact: 
Ross McLaughlin, Head of Commercial Services – Chair Asset Management Board
APPENDICES
A - CAPITAL INVESTMENT STRATEGY 2023 - 2038 
Page 145

Page 146

4 
Page 146

Page 147

1 
CAPITAL INVESTMENT
STRATEGY 
2023 - 2038 
Page 147

Page 148

2 
Argyll and Bute Council 
Capital Investment Strategy 2023-38
Version 21 – 21-07-23 
Table of Contents
1. Foreword from Leader and Chief Executive............................................................................ 3
2. Importance of the Capital Investment Strategy ...................................................................... 4
Aim & Ambition ............................................................................................................................ 4
Investing in our infrastructure ....................................................................................................... 4
Capital Investment in 2023............................................................................................................ 5
3. A national & regional approach ............................................................................................. 7
National Policy Context ................................................................................................................. 7
Regional Context – North Infrastructure Commission...................................................................... 8
4. Medium to Long Term Financial Planning .............................................................................. 9
Current Capital Forecasts .............................................................................................................. 9
Categories of investment ............................................................................................................ 10
5. Our approach to Capital and Infrastructure Investment ....................................................... 12
Asset Groups .............................................................................................................................. 12
Project Themes .......................................................................................................................... 15
Area Plans & Pipeline of Projects ................................................................................................. 16
6. Governance and assurance.................................................................................................. 16
7. Reviewing the Capital Investment Strategy .......................................................................... 20 
Page 148

Page 149

3 
1. Foreword from Leader and Chief Executive 
With the Argyll and Bute Outcome Improvement Plan (ABOIP) being refreshed in 2023 it is
important to prioritise investment that meets the changing strategic ambitions of our organisation,
region and wider community.  Also, inflation across many sectors over recent years has been at a
record high so labour, materials and goods are costing more than ever, requiring us to prioritise
spend on our most important activities.  This is at the same time as public sector budgets in real
terms are being reduced to meet national fiscal challenges.  We are committed to delivering high
quality services to our communities and stimulating and growing the population and economy of
Argyll and Bute.  We aim to set out a clear and strong direction for the Council which sets the scene
for our capital investment ambition in assets and infrastructure.   
Our Capital Investment Strategy considers how we can deal with short to medium term financial
uncertainty by taking a longer term view of our capital investment and how this can be put to best
effect to meet the needs of the area.  This is demonstrated in our corporate strategies and plans
including our £70m Rural Growth Deal (RGD) which is key to stimulating economic growth,
connecting our communities, growing businesses that do well and increasing skills in our area. 
Beyond the RGD, the competitive nature and bid style for grant funding awards from both Scottish
and UK Government has become normal practice and it is essential our Council sets a framework to
prioritise capital investment that best supports our ambitions – in essence a pipeline of projects is
required to align to the ABOIP or other corporate aims to ensure there is targeted deployment of
resources to achieve most efficient use of resource and limited capital and revenue.  Work is
currently underway to build a framework and consistent approach to mandating, recording and
monitoring projects as they move through the various stages of a project lifecycle (or the pipeline).    
It is clear that we cannot achieve our investment ambition on our own, we need to work
collaboratively with communities and other stakeholders to make sure that we understand local
needs and that we can deliver what we promise.   Planning for the longer term and having ambition
will also support the alignment of public funding with other organisations for the benefit of our
region.   We have to be realistic about what we can achieve with our known available resources,
which is why we are working with partners to deliver economic and infrastructure improvements. By
working with partners, we are ensuring that our resources can sit alongside and where available
leverage external funding opportunities to optimise the benefits for our area.  We need to invest for
longer term benefit and address ongoing challenges such as climate change and digital connectivity
but always be mindful that any investment must be undertaken in a prudent, affordable and
sustainable manner. 
Our strategic and financial management processes are essential for achieving financial resilience in
uncertain times. We must use our property, land and available resources wisely and ensure that we
attract appropriate external funding to our area. Our Capital Investment Strategy will continue to
evolve and be updated as strategic influences change over time, as new challenges and
opportunities present themselves and as the delivery of our investment ambition is realised. 
Cllr Robin Currie  Pippa Milne  
Council Leader   Chief Executive 
Page 149

Page 150

4 
2. Importance of the Capital Investment Strategy 
Aim & Ambition 
Argyll and Bute is recognised as one of Scotland’s most promising regions and we are ambitious for
our future.  As a council we need to make best use of our assets in a way that best benefits our local
communities.  We also need to be clear what our longer term ambitions are in order to commit,
fund, leverage, bid or have meaningful dialogue with partners to deliver shared strategic
infrastructure investments for our region.  Our 15 year Capital Investment Strategy will support us to
achieve the ambitions of our Corporate Plan and our emerging  ABOIP and resource the delivery of
our priorities such as:-  
Emerging ABOIP
1. Housing; 
2. Transport; and
3. Community Wealth Building
The Argyll and Bute Community Planning Partnership (CPP) has completed its community
engagement on identifying the priorities for the next 10 years (2023 - 2033).  A plan on how the CPP
will seek to address these priorities will emerge in due course. Argyll and Bute Council will continue
to be a leading partner in the partnership and ensure that the priorities of the CPP and the Council
are aligned
Corporate Plan
4. People and Places – Our Core Business as a Council; 
5. Potential & Growth – turning opportunities into reality;
6. Partnership & Action – everyone has a part to play in Argyll & Bute’s Success 
The Local Outcome Improvement Plan is important in describing our partnership approach to
investment and for engaging in open and frank dialogue with local communities and other
stakeholders. Delivery of these local outcomes will help us to achieve our overarching vision for the
Capital Strategy that is: 
Delivering infrastructure that supports our ambition for a thriving Argyll & Bute 
Investing in our infrastructure 
It is important to recognise that the Scottish Government defines infrastructure more widely than all
other parts of the UK, including digital, social infrastructure and natural systems. 
The physical and technical facilities, natural and other fundamental systems necessary for the
economy to function and to enable, sustain or enhance societal living conditions. These
include the networks, connections and storage relating to the enabling infrastructure of
transport, energy, water, telecoms, digital and internet, to permit the ready movement of
people, goods and services. They include the built environment of housing; public
infrastructure such as education, health, justice and cultural facilities; safety enhancement
such as waste management or flood prevention; natural assets and networks; and public
services such as emergency services and resilience. 
(Scottish Government – Infrastructure Commission) 
To this extent, the Council’s long term investment of many millions of pounds of infrastructure must
be viewed as a cornerstone for our region’s development across many forms including physical
Page 150

Page 151

5 
buildings, digital, transport and regeneration of our towns and villages.  This Capital Strategy also
aims to align our longer term thinking and priorities for infrastructure investment with other public
bodies such as NHS Highland, Police Scotland, Scottish Fire and Rescue, Further Education providers,
Registered Social Landlords and other public sector organisations to ensure best value is achieved
from public investment.  This movement towards more consolidated and regional capital planning
across the public sector also aligns to the Infrastructure Commission, the North Infrastructure
Commission and hierarchy of development principles.  
Capital Investment in 2023
In preparing this long term strategy it is important to set the scene of current conditions and issues
that are considered relevant to investing in future infrastructure.  These are as follows:- 
Geography 
Argyll and Bute covers an area of 691,000 hectares, making it the second largest local authority area
in Scotland. Our area has the third sparsest population density of the 32 Scottish local authority
areas, with an average population density of just 13 persons per square kilometre.  Argyll and Bute
has 23 inhabited islands (Census 2011) more than any other local authority in Scotland with around
17% of the population living on Islands (Census 2011). The area is also home to several long sea
lochs, which bisect the landscape and along with the islands give Argyll and Bute a very long
coastline and a higher level of reliance on ferries for travel. Almost 80% of the population live within
one kilometre of the coast (Scottish Coastal Forum, 2002).   The main settlements tend to be at the
extremity of the mainland area creating significant population dispersion in addition to low
population density. The size of the area and population dispersion require multiple facilities for
service delivery to ensure services are delivered close to users and communities. The distance
between main settlements and use of ferry services create challenges in terms of reliability, time
and cost of travel. The geography of Argyll and Bute cannot be changed so the challenge is how to
best use our assets to minimise the impact of any real or perceived obstacles. 
Our asset base is diverse and includes 2,310 km road, 901 bridges, 118 car parks, 39 piers and
harbours, 3 airports, 131 burial grounds, 30 children’s play areas , 92 school buildings, 3 children’s
houses, 6 care homes, 2 hostels, 6 community centres, 4 leisure centres, 5 halls, 6 libraries, 28 office
buildings owned and 8,528 PCs, laptops and communications equipment.   
Population decline 
Our ambition is to reverse the economic decline of the area.  To turn opportunity into success we
must reverse the decline in our population. Population forecasts estimate that by 2027 Argyll and
Bute will need another 10,000+ people to maintain services and more to drive business
development and deliver services for Argyll and the West Coast of Scotland. 
COVID Recovery
The global pandemic has had a major impact on both our communities and economy on a scale not
previously witnessed.  As we recover and implement measures as outlined in our Council Recovery
Plan, continuing to invest in infrastructure is vitally important to allow our communities to bounce
back.  This can be especially challenging as the current experience is that the pandemic has
materially increased the cost of many construction, labour and supply chains causing budget
pressure.  Whilst short term impacts are currently being absorbed through normal budget
management there needs to be close monitoring of the long term impacts of covid in terms of
locations that require investment and long term sustainability if costs do continue to be higher than
identified budgets.  The Councils Recovery Plan also identifies that recovery needs to be
underpinned by ‘green’ principles to assist with fulfilling our regions aspirations for achieving net
zero.   
Page 151

Page 152

6 
Climate Change
Our region benefits from natural assets, geography and societal circumstances including high tree
cover, peat bog, low density population and low polluting industries to mean Argyll and Bute is the
lowest CO2 producing region per capita in the UK.  In addition, our landscapes and natural
conditions also make it an ideal location for investment in renewable energy like hydro,
windturbines, solar, wavepower and sequestration like woodland planting and peat bog restoration. 
Whilst our region is well placed there is much more that can be done by the Council directly and in
partnership with others to deliver net zero and in advance of the 2045 backstop date.  Technology,
science and national approaches to climate change are evolving rapidly so this is an area that careful
measured will be required into infrastructure for the long term. It is also expected that energy
transition and movement away from fossil fuel will evolve and we have already implemented the
replacement of some of our existing petrol / diesel fleet to electric or hybrid and oil heated buildings
to air source heat pumps or biomass.  This will be an area of significant growth and investment in the
next 15 years and one which we should play to our regional strengths.   
Assets that don’t meet our communities needs
It is clear that we cannot achieve our investment ambition on our own, we need to work
collaboratively with communities to make sure that we understand local needs and that we can
deliver what we promise.   A place based approach will be essential to this.  
We have to be realistic about what we can achieve with our known available resources, which is why
we will work with partners to deliver economic and infrastructure improvements.
Rural Growth Deal
Our Rural Growth Deal (RGD) is key to realising this ambition and identifies the key growth sectors
that will keep our region competitive.   The Rural Growth Deal is a £70m 10 year programme of
mixed capital and revenue investment for our region.  This Capital Strategy is supportive and
complementary of the RGD.   It is considered essential to keep Argyll and Bute competitive in a
global economy, stimulate economic growth in our key business sectors and reverse the decline in
our population.  Informed by extensive research and public consultation, the Council, working in
partnership with a number of key stakeholders has developed the Rural Growth Deal in dialogue
with UK and Scottish Government representatives and the Scottish Futures Trust.  Project themes in
the deal are identified as investment priorities focusing on our key economic strengths and the
critical infrastructure, skills and education required for growth.  These are: 
Connecting: our high value and growing business sectors with national and international business
markets; our economic local successes with national strategic priorities.
 Transport (road/air routes to market)
 Digital
 Business innovation 
Attracting: additional skills, training and learning opportunities; new residents, visitors and business.
 Skills, training and education
 Accommodation (housing and business)
 Places to live, work and visit (community-led regeneration)
 Centre of excellence 
Growing: doing more of what works; making more of our natural and built resources.
 Aquaculture
 Tourism
 Low carbon economy
Page 152

Page 153

7 
3. A national & regional approach 
The majority proportion of Council capital funding to deliver our capital plan comes from Scottish
Government (General Capital Grant and Specific Ring-Fenced Capital Grants).   It is therefore a
requirement to align this Capital Strategy and our capital planning assumptions to other national and
regional priorities or policy context.   
National Policy Context 
In 2021/22 the Scottish Government set out its first ever 5 year Infrastructure Investment Plan 2021-
22 to 2025-26 or IIP.  The IIP has been published alongside the Capital Spending Review for the same
fiscal period, allowing it to tie the IIP in with the government's financial planning. The plan outlines
£26 billion of Scottish Government investment to be spent over the next parliamentary term, with
spending falling under three strategic themes: sustainability and a net zero economy; driving inclusive
economic growth; and building resilient and sustainable places. 
There are also a number of key themes around:- 
1. COVID-19 - The Scottish Government plan to use capital investment to support around 45,000
construction and maintenance jobs, with a particular focus on green jobs.  Covid has also accelerated
plans for digital connectivity, particularly in rural and remote areas such as Argyll & Bute. As a result,
through significant capital investment in digital services - for example, Digital Scotland Superfast
Broadband - the Scottish Government hopes to better support home-working.  There is also
commitment for £550m investment in active travel (cycling and walking), to free up space on public
transport for those who most need it. This will translate into adaptations to roads, creation of new
cycleways or pavement reconfigurations.   
2. Net Zero - This is one of most substantial priorities for spend as it looks to address climate change. 
Investment here includes: 
 £180 million for an Emerging Energy Technologies Fund to support carbon capture and
storage, negative emissions technologies and hydrogen development;
 £150m extra funding for flood risk management;
 £120m in transition to net zero electric buses;
 £1.6 billion over 5 years to decarbonise heat in buildings;
 £1.2 billion to enhance Scotland's railways. 
A key strategy here is the adoption of an "Investment Hierarchy". This initiative essentially favours the
improvement and repurposing of existing assets over the creation of new ones. There will also be an
increased spend on maintenance to ensure the longevity of existing assets. 
3. Inclusive economic growth - The Scottish Government is looking to improve the connectivity of the
various regions of Scotland investing in transport infrastructure, including by doubling its investment
in bridge and roads maintenance to around £1.5 billion.  It also hopes to benefit industry and tourism
in rural and remote regions by investing £220 million in agricultural support and £30 million in
delivering a National Islands Plan, which includes ring-fenced funding for green capital projects on the
islands. 
4. Resilient and sustainable places - The biggest spend in the plan is this category: over £3.3 billion
allocated to deliver more affordable and social homes.  There is also focus on healthcare, with health
maintenance investment totalling £1 billion. Schools will also see investment, with £2 billion allocated
Page 153

Page 154

8 
the Learning Estate Investment Programme (LEIP), with our Council  expressing an interest in  a new
facility on Mull. 
Regional Context – North Infrastructure Commission 
During 2021 Argyll and Bute Council has been a supporting partner to the North Infrastructure
Commission (NIC).    The NIC was established to develop a 15-year vision for infrastructure in the
‘North’ (which Argyll & Bute are categorised). The NIC has been established under the leadership of
Hub North Scotland Strategic Territory Partnering Board and Scottish Futures Trust. Partners include
Highland, Moray, Orkney, Shetland, Western Isles, Aberdeenshire, Aberdeen City Councils’, NHS
Grampian and Highland Health Boards.  Police Scotland, Scottish Fire & Rescue, HIE and Zero Waste
Scotland are also partners.  Bringing such a large number of public sector bodies together to deliver a
long term infrastructure plan is evolving and at an early stage however the opportunities for
collaboration, shared prosperity, leveraging funding, efficiencies of scale and knowledge transfer are
significant – particularly on some of the future and shared strategic challenges such as delivery of
energy transition, regional transport or connectivity in rural or isolated areas.   
At the centre of the NIC also sit a number of key themes including ‘place’ and ‘place based reviews’,
which aims to bring the public sector partners together in collaboration to create bespoke assets and
infrastructure for the town or village they operate to meet the needs of the customer of community. 
This tailored approach is key to success of future capital planning particularly in the context of the
Governments investment hierarchy where existing buildings are prioritised to be repurposed or shared
with others before new build is considered.  Place based reviews are already underway in Dunoon,
Lochgilphead & Rothesay with our partners NHS Highland and Health and Social Care Partnership. 
Future place based reviews are also planned for Mull to site selection should our bid for the Learning
Estate Investment Programme (LEIP) be successful.   
Vision for NIC: 
“Support the transition to a net zero society by 2045 and improve service outcomes and benefits
from future investment in infrastructure for the North of Scotland” working to a set of Strategic
Goals: 
Strategic Goal #1 – Create a coordinated hierarchy-based investment plan for social
infrastructure investment. 
Strategic Goal #2 – Assess opportunities to improve outcomes and drive commercial
efficiencies, stimulate inward investment, create inward migration to the region by making
the best use of resources, leveraging supplementary public and private funding to support
growth.
Strategic Goal #3 – Develop an infrastructure assessment framework and methodology
creating a wellbeing economy with sustainable and inclusive growth for all, founded on
place needs, integration, collaboration and improved public service outcomes. 
One of the main outputs from the NIC will be a map of all identified social infrastructure needs
including unfunded and funded priorities over 15 years in the north.    This North Infrastructure
Investment Plan (NIIP) will allow for the regional needs to considered and identify clustering,
efficiencies of scale, integration, funding leverage or sharing of experience.    One of the recognised 
barriers  to true shared working with other public sector partners has also  non –alignment of capital
programmes, different governance structure / timings, different sources of funding and differing
internal priorities.  Through progression of the NIC and NIIP these challenges should be eroded as
common priorities and investment is sought.
Page 154

Page 155

9 
4. Medium to Long Term Financial Planning 
This Capital Strategy also sits alongside and is underpinned by the ‘Medium to Long Term Financial
Strategy’ of the Council.  This document acknowledges that our Council, like all councils, faces
significant financial challenges and is required to operate within tight fiscal constraints for the
foreseeable future due to the continuing difficult national economic outlook and increased demand
for services. It also recognises the Council’s duty to set a prudent, sustainable budget, and seeks to
provide a practical foundation for the provision of the best possible value for money in the delivery
of Council services in the longer term.  The Council recognises that demand for capital asset
management funding outstrips supply and balancing this issue, and associated priorities, has been
and continues to be a fundamental aspect of our asset management planning and capital strategy. 
Funding for the capital plan comes from Scottish Government (General Capital Grant and Specific
Ring-Fenced Capital Grants), other capital grants, capital receipts from asset disposals, revenue
contributions to capital, earmarked reserves, prudential borrowing and borrowing funded by the
loan charges provision in the revenue budget. 
The Scottish Government receive a grant for capital spending from the UK Government which is then
allocated to individual Local Authorities. The capital block grant has reduced year on year since
2017/18 through to present and with flat cash settlements feeling like reduction given sharp rise in
inflationary rates.  The Scottish Government also undertook a Capital Spending Review which
indicates that the capital settlement for the next five years is likely to remain constant. 
The impact of the COVID-19 pandemic saw a reduction in capital receipts since 20-21 and slippage
within the Council’s capital programme. 
Current Capital Forecasts 
At present, as with other Local Authorities, our Council obtains the Scottish Government Capital
Grant Funding (referred to above) on a single year basis.  This therefore makes solid capital planning
for the medium and long term less certain as budget assumptions have to be made for any period
over 12months.  Notwithstanding this, the Scottish Government has indicated that 3 year
settlements should be forthcoming in future years and our Council already adopt a 3 year rolling
capital plan which is reviewed on an annual basis alongside the full Budget. The Current capital plan
as agreed in February 2023 is:- 
Capital Block Allocations     
Already within existing capital plan -
not additional funding
Based on
22-23
actual
settlement  
% 2022-23 2023-24 2024-25 2025-26    
£'000 £'000 £'000 £'000
Education 26 2,920 2,243 2,226 2,219
Customer Services - IT 9 1,011 777 771 768
Customer Services - Facilities 5 561 431 428 427
Roads & Infrastructure Services 46 5,165 3,969 3,939 3,927
Vehicles (added to RIS) 4 449 345 343 341
HSCP (IJB) 5 561 431 428 427
Live Argyll 5 561 431 428 427  
100 11,229 8,628 8,563 8,536
Page 155

Page 156

10 
Categories of investment 
The projects within the capital plan are categorised as either asset sustainability, service
development or strategic change with a definition of each category as noted below: 
• Asset sustainability:  this encompasses projects related to ensuring existing assets are fit for
purpose/continue to be fit for purpose based on existing use.
• Service Development:  with a focus on enhancing the current asset to improve its fitness for
purpose or its efficiency and effectiveness. Service development would cover
construction/acquisition of new assets to replace existing assets on a like for like basis or investment
in assets to enhance service delivery based on existing use. Projects in this category would typically
be under £1,000,000 in capital costs.
• Strategic Change:  with a focus on a significant investment across the service asset portfolio
to support fundamental service development.  The requirement for this investment would be driven
by corporate priorities. Projects in this category would typically be at least £1,000,000 in capital
costs. 
The breakdown based on categories is as follows:- 
Category 2022-23         
£000s
2023-24         
£000s
2024-25         
£000s
2025-26         
£000s 
Total 
£000s 
Asset Sustainability 21,685 26,775 8,933 9,082 66,475
Service Development 7,690 2,013 20 0 9,723
Strategic Change 17,462 33,932 28,356 29,700 109,450
Overall Total 46,837 62,720 37,309 38,782 185,648 
This table highlights the balancing of investment across asset sustainability, service development
and service change, across the overall plan.  Based on the current planning the importance of ‘asset
sustainability’ is recognised and ongoing investment is needed to be allocated to our existing assets
to ensure they remain relevant and fit for purpose.  This is the significant proportion of our funding
to keep the ‘like for like’ still functioning.  To this extent, collective service re-design or opportunities
to rationalise need to be considered where it is appropriate to do so.   
Furthermore, due to increasing cost of utilities, rates and maintenance it is even more important to
divest ourselves via rationalisation, repurposing or asset transfer of building assets that are surplus
to operational need.  We must be bold and innovative by working with partners and embrace
modern working methods to maximise opportunities – much of which is already underway or being
implemented by Our Modern Workplace (OMW) Programme.   The underlying principle is to reduce
the footprint of our built estate as this would limit the increasing spend on asset sustainability,
utilities, rates and maintenance with resource being re-diverted into other priorities for the Council
such as direct service provision, service development or strategic change.   
It is these latter areas of Service Development and Strategic Change that require the longest lead in
or mobilisation period due to their often large scale or level of investment required.  There may also
be requirement to leverage in support or funding from other sources which can be complex or
increase timescales for Business Case Development.  It is these categories that will benefit most
from a longer term approach and strategy on Capital.  Big and complex change such as delivering
regional net zero, big transport investment or digital connectivity will also benefit from a
coordinated and collective leadership towards infrastructure planning over a 15 year period.   
Page 156

Page 157

11 
It is also noteworthy that Capital receipt estimates from the sale of assets are reviewed annually and
reported to Council as part of the budget report.  This is particularly relevant as in the wake of the
global pandemic forecasting for receipts is predicted to slow or downturn.   
At present, Business cases for capital projects are prepared and assessed by the Asset Management
Board before being put forward for inclusion within the capital plan – the scoring of business cases is
assessed by impact, affordability, deliverability and risk.  Slippages/accelerations are reported as
part of the budget monitoring process and are given consideration as to whether other projects can
be accelerated/slipped.  Under and over spends on projects are managed within the overall
programme unless they are significant in nature or require additional resource. 
Work is currently underway to build a new framework and consistent approach to mandating,
recording and monitoring projects as they move through the various stages of a project lifecycle
called Pipeline of Projects and being led by Chief Executive Unit.     
Long Term Capital Grant Estimates
The estimate of capital grant funding for the long term is outlined in the table below. 
Scenario 2024/25
£000
2025/26
£000
2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
2031/32
£000
Best
Case
10,481 10,690 10,904 11,122 11,344 11,571 11,803 12,039
Mid-
Range
9,876 9,876 9,876 9,876 9,876 9,876 9,876 9,876
Worst
Case
9,295 9,109 8,927 8,749 8,574 8,402 8,234 8,069   
Currently, the estimated funding for the long term is not committed to any projects, however, there  needs
to be awareness that a large proportion of the capital funding will be required to sustain the current asset
base under asset sustainability in order to meet health and safety requirements, for example, re-roofing,
replacement windows, roads reconstruction.  Therefore the importance of successful bidding to structural
funds, partnership working and winning funding from other sources to deliver Service Development or
Strategic Change projects will be become even more important.  There has been an increased number of
new funds announced recently like UK Government Levelling Up, Future Transport Fund, Learning Estate
Investment Programme and National Islands Plan that may be targets depending on the requirements.   
Page 157

Page 158

12 
5. Our approach to Capital and Infrastructure Investment
In order to manage and plan investments appropriately our assets have been grouped into 8 categories. 
Prioritisation and themed investment is also suggested depending on the asset.
Asset Groups
The asset groups we have identified for planning are: 
1. Property assets – all buildings including operational, commercial LIVE Argyll& HSCP
2. Roads and related assets
3. Amenity assets
4. Education assets
5. Housing 
6. Transport infrastructure
7. Machinery, fleet  and vehicles 
8. ICT assets
In addition the Capital Investment Strategy introduces two asset themes:
9. Economic Development 
10. Climate Change
This will enable us to ensure that the capital funding we have available best meets the aspirations and
ambitions of the Council in growing our economy and protecting our environment.  
For each grouping the following projects and commitments have been identified which will require capital
funding during the lifetime of the Capital Investment Strategy.  In addition there will be an ongoing capital
commitment to maintain the current assets to a usable standard.  
1. Property assets 
Property assets are essential to supporting the services delivered by the council. Managing these assets is a
structured process which seeks to ensure best value for money and improved performance in meeting
strategic needs.  Property assets include shared offices, LIVE Argyll properties, Health and social care
properties, children’s homes, day centres, care homes, customer service points, leisure centres, halls,
community centres and libraries.
It will also include buildings like public conveniences, depot buildings, stadiums & pavilions which
historically have been held on separate accounts or budgets. These will move to being managed 
corporately  by  the Property team on behalf of the whole organisation and this  will  require the
realignment  of budgets in  recognition of this change.  
Notably this category also includes commercial property assets and our investment portfolio where
revenue is created through the lease or licence of property.  This income is then reinvested into other
priorities of the Council. The growth of investment opportunities and generation of long term revenue on
Council owned property will be prioritised through the development of a Commercial Investment Team
and Programme.  
Priority projects being taken forward for this category will include: 
 Improvements to the physical environment, maintenance and suitability 
 Commercial Priority Projects and One Council income generation
 Asset rationalisation
Page 158

Page 159

13 
 Regeneration projects
 Colocation and shared office space
 Energy efficient buildings
 Climate change related investment and projects
 Community use of our buildings
 Support for delivery of council priorities and improved community outcomes 
2. Road related assets 
Roads related assets are the council’s largest and most visible asset.  The network includes roads, footways
and cycleways including lighting, signage, vehicle barriers and drainage.  Roads related assets include
structures such as bridges, retaining walls, coastal protection and slope stability infrastructure.  As this is a
highly visible part of the council’s portfolio adequate maintenance is essential to ensuring the existing
infrastructure supports the communities of Argyll and Bute.  
Priority projects being taken forward for this category will include: 
 Improvements to the physical environment and suitability 
 Reconstruction 
 Maintenance 
 Road related construction 
 Flooding infrastructure 
 Major infrastructure projects 
 Addressing or adaptation for climate change
 Active Travel 
3. Amenity
The aim of this asset group within the capital programme is to provide fit for purpose amenity assets that
support high quality service delivery and meet the needs of our communities, whilst minimising costs and
future liabilities.
Priority projects being taken forward for this category will include: 
 Cemetery expansion including internal bridges, walls and roads
 Playing fields and public park commitments including internal bridges, walls and roads
 Public Convenience improvements and rationalisation 
 Improvements of amenity spaces
 Playparks 
4. Education
This asset group includes, in addition to planned maintenance, large scale or specific projects to build,
extend or substantially improve the Education estate.  Our Learning Estates Strategy provides the
framework and prioritisation for improvements to our schools and will ensure our buildings are no longer
used in isolation for the delivery of education but rather should be a hub for the local community.  We will
look at the sustainable use of our learning estate, moving forward buildings will support the community in
addition to being centres for learning and teaching.  
Priority projects being taken forward for this category will include: 
Page 159

Page 160

14 
 Improvements to the condition and suitability 
 Potential new school projects and whole school refurbishments – notably a LEIP bid for Mull
 Delivering community and commercial opportunities from Learning Estate
 Improving environmental performance  of the Learning Estate 
5. Housing 
Housing development is principally funded through the Strategic Housing Fund.  However, in 2023 the
Council have declared a housing emergency and new and innovative options are currently being
considered to intervene and improve current circumstances.  A Housing Delivery Group has been
established to identify current challenges and seek solutions. The SHF is primarily funded by revenue raised
through a decision to reduce the discount awarded to Council Tax on empty and second homes in Argyll
and Bute.  Housing is a growing area of focus and re-fresh of ABOIP plus Council direction in 2023 is likely
to grow intervention and focus on the subject matter.   The Council has already  agreed to extend the
funding criteria to include community groups as well as Registered Social Landlords, providing they secure
a Rural Housing Fund and/or Island Housing Fund grant from the Scottish Government.  In order to enable
larger housing developments there can be a requirement for investment in enabling infrastructure which
would support the growth of communities ensuring we meet the ambition in the local development plan.  
Projects taken forward in  this area could include:
 Contributions  to  social  housing  developments
 Enabling infrastructure such as access roads
 Investment in other tenures of housing
 Land acquisition
 More innovative measures as defined by Housing Delivery Group 
6. Transport infrastructure 
The Council has given a commitment to ensure that our infrastructure is safe and fit for the future; that our
communities are protected and supported; that we are efficient and cost effective and that we provide
support, prevention and opportunities to help people make better lifestyle choices.  A key part of the
Council’s vision is to ensure that our diverse geographic location with remote, rural and island
communities is fully taken into account when distributing funding.  To that end, the Council has a 10 year
asset management plan in place for all of its 39 piers and harbours.  The Council’s transport infrastructure
is a valuable asset – as such, both capital and revenue funding is carefully allocated to ensure the future of
related infrastructure is safeguarded for all.
Projects being taken forward include the construction, reconstruction, improvement of and maintenance
of:
 piers
 harbours 
 airports 
7. Machinery, fleet and vehicles 
This asset group comprises plant such as road rollers, hot boxes, ride on lawnmowers etc; fleet items such
as bin lorries, gritters and school mini buses; as well as vehicles like pool cars, including an increasing
amount of electric/hybrid vehicles.  There is a government requirement to make all small vehicles and cars
Page 160

Page 161

15 
electric by 2025 but is currently unfunded.  These assets are crucial in allowing the Council to deliver its
public services across such a large and geographically diverse area, with effective fleet allowing us to
support frontline services to meet our statutory requirements in terms of legislation such as the Roads
Scotland Act and the Environmental Protection Act. In considering capital investment it is important to
consider whole life costings and any potential future revenue implications, positive and negative e.g. the
revenue implications for maintenance should reduce following capital investments.  
Projects being taken forward include:
 Equipment replacement
 Vehicle replacement 
 Waste disposal provision
 Phasing in the use of electric and hybrid vehicles including electrical charging facilities 
8. ICT assets 
This asset group Includes planned maintenance of key council wide infrastructure and supports major
change projects designed to help the Council become a “forward looking and ambitious” organisation
through the delivery of reliable and efficient ICT Services, by maximising access to information to support
better quality decision making, via continuous improvement, and supporting a change in work styles. The
Council’s ICT and Digital Strategy illustrates the Council’s expectations for ICT services to seek further
opportunities to contribute to an on-going transformation programme and to help deliver the greatest
service delivery efficiencies possible.
Projects being taken forward include:
 Digital first strategies 
 Artificial Intelligence
 Replacement and rationalisation or new business applications
 Mobile technologies
 Infrastructure and Digital Foundations/ Core Technologies servers and storage
 Security and Compliance
 PCs, and Laptops
 Internet of Things (IOT)
 Enabling An Agile And Flexible Workforce
 Customer Engagement
 Education ICT and Virtual Learning 
Project Themes
As well as the defined asset categories listed above there are 2 specified project themes which are
concerned with capital spend and infrastructure investment that are cross cutting across the organisation. 
Both of these categories already have dedicated governance through their own Boards so the role of the
Capital Investment Board will be amended accordingly for these projects.  
9. Economic Development
This group has historically been amongst the largest portfolio of capital spend for the Council and in recent
years has included the strategic change projects of Helensburgh Waterfront, CHORD Improvements,
Rothesay Pavilion and Queens Hall Dunoon.  Currently the Oban & Lorn Arc Tax Incremental Financing (TIF)
Page 161

Page 162

16 
Project and Rural Growth Deal (RGD) are underway at varying stages.  These large projects transcend a
number of years and it is proposed update reporting is provided to the Capital Investment Board whilst
governance is delegated to the respective project or programme board.  Due to the significance of these
projects capital monitoring will be key to overall budget performance of the Council.  
10. Climate Change 
This grouping is varied and all departments have a role to invest in projects to help the Council and region
achieve its net zero target by 2045.  This may include energy efficiency, creation of renewable energy,
sequestration or removing fossil fuel reliance.  All such projects are reported to the Climate Change Board
and thereafter will be heard by the Capital Investment Board for review of Business Case.  
Area Plans & Pipeline of Projects
The Council is committed to the creation of Area Plans following Budget decisions in 2023.  Work is
ongoing across the Council to develop Area Plans for defined geographic locations during 2023/ 24 and
beyond.  Whilst the exact form of these plans or groupings is currently unclear it is likely they will have an
influence on investment priorities and scoping infrastructure for our region.  We can expect these
ambitious plans to shape the future capital investment and prioritisation of spend in terms of Council’s
asset base like property assets, roads & related assets, amenity assets, housing assets, education assets,
transport infrastructure, ICT Assets and Equipment fleet and vehicles.  
Area Plans are also likely to identify investment from both private and public sector that sets ambition plus
confirmed and unconfirmed projects some of which will currently be unfunded or aspirational.  This work is
in effect a framework to coordinate and ensure corporate awareness of potential future development and
inform future years Capital Planning.  
In a similar vein, work is ongoing to develop a Pipeline of Projects which includes both funded and
unfunded worksteams that support the strategic aims of the Council, our communities or region.  Given
the current landscape of government funding which is bid led it is increasingly important to develop
projects / propositions to an Outline Business Case in order they can be drawn down ready to submit to
these competitive (and usually with tight timescales) processes.  Work and alignment with this Pipeline of
Projects and Capital Planning will continue.   
6. Governance and assurance 
The Capital Investment Strategy, corporate Asset Management Strategy and capital programme provides a
strategic framework for securing best value in the use of the council’s capital resources and asset
infrastructure. Our Capital Strategy aims to take a whole organisation approach to prudent, sustainable
and resilient investment.
This new strategy sets out a refresh of the process and greater inclusion of elected Members when setting
category priorities over the medium term.  
To ensure that the Strategy is translated into ongoing delivery at operational level, the following revised
governance arrangements are proposed.
The aim is to have a review and refresh of current arrangements so notably some terminology is changing
including:-
 Strategic Asset Management Board (SAMB) is being replaced by Capital Investment Board (CIB);
 Service Asset Management Plans (SAMPS) are being replaced by Priority Investment Plans (PIPS);
Page 162

Page 163

17 
Role of elected members 
The Council’s Constitution and Financial Regulations provide a robust framework for monitoring and
reporting the Capital Investment Strategy and plan.  In setting the Budget elected members approve the
Council’s capital expenditure and decisions relating to the control of the Council’s borrowing requirement. 
The Council’s Constitution details the specific delegations.   The principal delegation in relation to capital
investment and asset management planning including monitoring lies with the Policy and Resources
Committee as per the Council Constitution. 
The annual review of capital programme is linked to the budget and service planning process.  
The management of the capital programme is undertaken by the Capital Investment Board and recorded
on Service Asset Management Plans and Group Asset Management Plans (SAMPS + GAMPS) which are
reported to ELT and form part of budget pack.  The SAMPS/ GAMPS templates have undergone a redesign
in 2022/23 and are now considered to be more accessible and focussed documents that better support
Member  decision making  and scrutiny.   As part of this refresh of arrangements and to better reflect that
we are prioritising spend per service it is proposed to rename the new version SAMPS/ GAMPS template as
Priority Investment Plans (PIPs).  The PIPs are developed in year, services will engage with Departmental
Management Teams and Policy Lead to identify priority projects.  Engagement will take place early on in
the process with the elected members to check that the emerging priorities within the PIPs support their
priorities.   
For the avoidance of doubt, there will require to be a certain level of operational asset sustainability to
maintain service delivery e.g.  maintaining buildings as wind and watertight or ensuring health and safety
requirements are met .  This will be set out by officers and any change to this will require wider changes to
service delivery. 
Prioritisation of asset sustainability and service development investment in line with priorities with an
understanding of the anticipated impact of investment e.g. roads resurfacing or school suitability where
investment may not be essential but reduced investment may lead to deterioration. 
Once the Council has confirmed Priority Projects within the PIPs, the residual block allocation can be
allocated to other requirements.  Service Development and Strategic Change projects will require
satisfactory business cases.  Once the PIPs are prepared engagement begins with all elected members in
conjunction with budget preparation. 
The Capital Investment Board (new name – formally the Asset Management Board)
The Asset Management Board – as currently known – will be wound up and replaced with a new Capital
Investment Board. The membership of the board will be reviewed but the intention will be to have
Financial Services and asset leads / Heads of Service or 3rd Tier present thereby increasing strategic
influence and prioritisation.  
The capital programme will be prepared and monitored by the Capital Investment Board chaired by the
Head of Commercial Services.   
The Asset Groups have been allocated to the members of the board: 
Asset Group Responsibility
Property assets Commercial Services
Page 163

Page 164

18 
Roads and related assets Road and Infrastructure Services
Amenity assets Road and Infrastructure Services
Education assets Education Service
Housing enablement  Commercial Services
Transport infrastructure Road and Infrastructure Services
Equipment, fleet  and vehicles Road and Infrastructure Services
ICT assets Customer Support Services
Economic Development  Development and Economic Growth 
Climate Change Commercial Services 
The Capital Investment Board will meet quarterly and the frequency of the meetings may increase at times
of high activity (budget setting).  Financial Services will be present for every meeting and update on
position and monitoring of capital expenditure at an executive level.  Other Project Managers or support
may be called in depending on nature of agenda.  Reporting to the Capital Investment Board will be in
accordance with the principles of good project management i.e. reporting by exception, to ensure effective
use of the Board’s time and to ensure the Board’s input is maintained at a strategic level. 
Services will notify the board of emerging projects and priorities.  The board will use block allocations as
the starting point when preparing the capital programme.  The existing formula for block allocations is
based on GAE and this will be reviewed in 2022/23 and be in place for the setting of the capital programme
in 2023/24.  Block allocations relate to the general capital grant allocated from Scottish Government and
excludes other specific grants e.g. rural deal, coastal communities fund and any other source of external
funding.  
Capital will be allocated to individual projects through the development of the PIPs or funding obtained
through other sources – for example externally funded or grant awarded projects.  The PIPs focus on the 3
types of projects, asset sustainability, service development and strategic change.  A PIP will be prepared for
each of the 8 asset groups and replace the Service Asset Management Plans.  The PIPs will be prepared by
Officers and signed off by the Capital Investment Board.
PIPs will also be prepared for Economic Development and Climate Change projects and all projects within
these plans will require business cases.  
In addition, all new service development and strategic change projects within the capital programme will
be required to develop through to Outline Business Case i.e. they will be supported by a Strategic Outline
Programme (SOP) [Gateway Review Stage 0 – Strategic Fit] to determine the strategic context; and a
Strategic Outline Case (SOC) [Gateway Review Stage 1 – Business Justification] which will scope the
proposal.  All strategic change projects will be required in turn to develop a full business case.  Asset
sustainability projects do not require a business case of any type as information on the condition and
suitability of the asset is available.  All business cases will be scored and prioritised by the Capital
Investment Board even if they are to be approved by another board / governance structure.   
Business cases for specific grants e.g. rural deal, Crown Estate funding and any other source of external
funding should be presented to Capital Investment Board for scoring and recommendations.    
Page 164

Page 165

19 
The role of the Capital Investment Board is:
 To ensure that decisions in respect of capital funding are aligned to the council’s strategic priorities,
are affordable and deliverable;
 To scrutinise the business cases for strategic change and service development, including the stated
benefits from the capital investment, as well as the council’s asset sustainability priorities; 
 To ensure that Capital Prioritisation Plans are prepared for a 5 year period, reviewed and updated
annually – services will be responsible for informing the appropriate Asset Category Head of Service of
their particular service’s current and future operational requirements for each asset or category of
assets;  
 To ensure effective consultation with Services to determine and document their future needs;
 To develop appropriate criteria to determine the prioritisation for capital investment in assets; 
 To monitor the on-going delivery of the programme of individual projects to ensure delivery against
budget, programme and quality criteria and manage slippage and accelerations;
 To provide direction to any projects which are in exception;
 Monitor the progress in delivering capital projects on a programme basis with overview material
slippage or acceleration to meet the priorities of the Council;
 To evaluate the success of delivered projects in the context of the benefits (forecast and delivered)
and, by extension, the overall return on the capital investment. 
The Executive Leadership Team (ELT) will set the direction within which the Capital Investment Board
operates.  Capital Prioritisation Plans are scrutinised and challenged by the Capital Investment Board and
interdependencies identified.  Implementation programming begins and resources allocated.  Capital
Prioritisation Plans are in turn issued to Departmental Management Teams (DMTs) for information and
approval before submission to ELT.   
Monitoring and Reporting:
The progress of capital projects is reported to Executive Leadership Team (ELT) and the Policy and
Resources (P&R) Committee via the PIPS Process, capital monitoring report included in the financial
monitoring pack. This ensures that management and Elected Members have an understanding of projects
that are progressing as intended and also ensures early identification of projects that may not be
progressing as expected and allows action to be taken to rectify this where possible. This information is
collated from project managers monthly where they provide updates on year to date spend,
slippage/accelerations, virements between projects, total project spend project timescales, project
benefits and project risks.
The estimates, as reported within the capital plan monitoring, are then factored into the treasury
management reports to ensure that regard is given to the treasury position. When we have a better view
of our capital investment requirement and ambition in our capital investment plan, we will aim to
summarise the treasury position, where relevant to the Capital Investment Strategy, in future iterations of
the Capital Investment Strategy.
When the Council is better able to extend the capital plan to a period of up to 15 years, it will enable an
improvement in the management of the forward balance sheet position. It will enable an extension of the
Capital Financing Requirement (CFR) profile, which in turn will enable a much more realistic delivery profile
and stronger view of the potential borrowing requirement. 
A diagrammatic of the governance arrangements is show at Appendix A.   
Page 165

Page 166

20 
7. Reviewing the Capital Investment Strategy 
The Capital Investment Strategy has been informed by research into strategic influences as well as
discussions with officers across the Council. The Strategy will be put to elected Members for review and
discussion during 2023.  
The programme and list of investment priorities will be updated on an annual basis and this overarching
Strategy will be reviewed on a 5 yearly basis or as and when necessary to respond to new challenges and
opportunites as these arise. 
Page 166

Page 167

ELT
CAPITAL INVESTMENT
BOARD (CIB)
HIGHLIGHT REPORTING 1x QUARTER + BUDGET PREPARATION
Priority Investment Plans (PIPS) - formerly called SAMP/ GAMPS
PIPELINE OF PROJECTS
BUSINESS CASE SCORING
STRATEGIC CAPITAL PLAN MONITORING + IDENTIFICATION OF ISSUES
REVIEW CAPITAL FUNDING OPPORTUNITIES
EXTERNAL FUNDING OPPORTUNITIES
.
ToR =Gateway Checks,
exception reporting,
corporate / strategic
challenge
CAPITAL INVESTMENT BOARD 
GOVERNANCE
Page 167

Page 168

This page is intentionally left blank

Page 169

1 
ARGYLL AND BUTE COUNCIL        POLICY AND RESOURCES
COMMITTEE       
COMMERCIAL SERVICES                                 10th AUGUST 2023 
COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 – UPDATE – EXPRESSIONS
OF INTEREST / ASSET TRANSFER REQUESTS / REPORTING REQUIREMENTS 
1. EXECUTIVE SUMMARY 
1.1  The purpose of this report is to advise the Policy and Resources Committee on: 
 The operation of the processes in regard to formal Asset Transfer Requests
(ATR) and Participation Requests in terms of the Community Empowerment
(Scotland) Act 2015;
 Current live informal Expressions of Interest (EOI’s) which may become
subject to a formal asset transfer request or be dealt with outwith the formal
asset transfer request process;
 Current live ongoing or agreed Participation Requests received by the Council;
and
 The annual reporting requirements in respect of Asset Transfer Requests and
Participation Requests set out in Section 95 and 32 of the Community
Empowerment (Scotland) Act 2015 respectively. 
1.2 At the Elected Members seminar on 21st March 2023 it was agreed that updates on
ATRs and EOIs would be provided on a 6 monthly basis. Accordingly this report will
be circulated to all Members following the committee and a further update report will
be provided to all Members in February 2024. 
RECOMMENDATIONS 
1.3 It is recommended that: 
The Policy and Resources Committee note and consider the report. 
Page 169 Agenda Item 7

Page 170

2 
ARGYLL AND BUTE COUNCIL        POLICY AND RESOURCES
COMMITTEE 
COMMERCIAL SERVICES                                 10th AUGUST 2023 
COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 – UPDATE – EXPRESSIONS
OF INTEREST / ASSET TRANSFER REQUESTS/ REPORTING REQUIREMENTS 
2. INTRODUCTION
2.1 The purpose of this report is to advise the Policy and Resources Committee on: 
 The operation of the processes in regard to formal Asset Transfer Requests
and Participation Requests in terms of the Community Empowerment
(Scotland) Act 2015;
 Current live informal Expressions of Interest (EOI’s) which may become
subject to a formal asset transfer request or be dealt with outwith the formal
asset transfer request process;
 Current live ongoing or agreed Participation Requests received by the Council;
and
 The annual reporting requirements in respect of Asset Transfer Requests and
Participation Requests set out in Section 95 and 32 of the Community
Empowerment (Scotland) Act 2015 respectively. 
2.2 At the Elected Members seminar on 21st March 2023 it was agreed that updates on
ATRs and EOIs would be provided on a 6 monthly basis. Accordingly this report will
be circulated to all Members following the committee and a further update report will
be provided to all Members in February 2024. 
3. RECOMMENDATIONS 
It is recommended that: 
3.1 The Policy and Resources Committee note and consider the report. 
4. DETAIL
4.1      The Council operates processes in compliance with parts 3 and 5 of the Community
Empowerment (Scotland) Act 2015 in regard to: 
 Asset Transfer Requests (ATR’s) (part 5 of the Act) which came into force on 23
January 2017.   ATR’s enable community bodies to make requests to all local
authorities, Scottish Ministers and a range of public bodies for any land or
buildings they feel they could make better use of. They can request ownership,
lease or other rights as they wish.
Page 170

Page 171

3 
 Participation Requests (Part 3 of the Act) which came in to force on 1 April 2017.
These are requests to public bodies which, if granted, enable communities to
participate in decisions and processes which are aimed at improving outcomes. 
EXPRESSIONS OF INTEREST (EOIs)
4.2 There were twenty (20) active Expressions of Interest (EOIs) (as at 21st June 2023)
and these EOI’s are listed in Appendix 1. Since the update report in August 2022, 10
EOI’s have been received. To date, since January 2017, 84 EOIs have been received
of which 64 have been resolved or withdrawn. It should be noted that the Council has
continued to engage with community groups who have had EOI’s active for a
significant period of time and while they remain active the requesters have not yet
moved them on. There are currently no significant actions outstanding for the Council
in relation to these. 
4.3 Further, most EOIs would not progress or develop into a formal asset transfer
request. EOIs are dealt with in a way that seeks to deliver the outcome required by
the community group allowing the request to progress outwith the formal asset
transfer process. Some EOIs are also withdrawn for a variety of reasons such as the
group changing focus of what was needed, a better option becoming available or a
lack of time and resources to progress their plans. 
ASSET TRANSFER REQUESTS
4.4 The Council has put in place information, advice and guidance to community bodies
who are interested in making a formal ATR and further information on this can be
found on the Council’s website at 
https://www.argyll-bute.gov.uk/my-community/communities-and-
partnerships/community-asset-transfer/asset-transfer-expressions. 
There have been 3 ATRs submitted following the implementation of the Act and as at
31st May 2023 there were no active ATRs. 
PARTICIPATION REQUESTS 
4.5 Part 3 of the Community Empowerment (Scotland) Act 2015 provides a framework
for the use of participation requests by community bodies, with the intention of
enabling communities to have more influence over services and decisions which
affect them. Part 3 of the Act came into force on the 1st April 2017. 
4.6 In line with the requirements of the Act, the Council has put in place a procedure
which allows consideration of any requests made by community bodies. The
procedure and further information can be found on the Council’s website at
https://www.argyll-bute.gov.uk/my-community/communities-and-partnerships/find-
out-more-about-participation-requests 
4.7 During the period 1 April 2022 to 31 March 2023, the Council did not receive any
participation requests. 
ASSET TRANSFER AND PARTICIPATION REQUESTS - ANNUAL REPORTING
REQUIREMENTS 
Page 171

Page 172

4 
4.8 Section 95 of the Community Empowerment (Scotland) Act 2015 requires the
Council to publish an annual report setting out the numbers of asset transfer
requests received and their outcomes. 
4.9 The report also requires to set out what the Council has done to 1: promote the use
of asset transfer requests and 2: support community bodies to make requests and
can be found on the Council’s asset transfer webpages here: 
https://www.argyll-bute.gov.uk/my-community/communities-and-
partnerships/community-asset-transfer/asset-transfer-expressions 
4.10 Annual reports cover each year from 1 April to 31 March and must be published by
30 June. 
4.11 Section 32 of the Act also requires the Council to publish an annual report in respect of
Participation Requests setting out: 
 The number of requests received;
 The number of requests agreed and refused;
 The number of requests which resulted in changes to a public service provided by,
or on behalf of, the public service authority; and
 Any action taken by the public service authority to promote and support the use of
participation requests. 
4.12 Annual reports Participation Requests cover each year from 1 April to 31 March and
must be published by 30 June. The relevant report has been published on the
https://www.argyll-bute.gov.uk/my-community/communities-and-partnerships/find-
out-more-about-participation-requests 
5. CONCLUSION
5.1 This report advises the Policy and Resources Committee on the operation, of the
processes in regard to Asset Transfer Requests and Participation Requests in terms of
the Community Empowerment Act 2015 and updates on ATR’s, EOI’s and Participation
Requests to date. 
5.2 It is recommended that the Policy and Resources Committee note the contents of the
report.  
6.  IMPLICATIONS
6.1 Policy – In line with council policy relating to Asset Transfer and Participation
Request processes.
6.2 Financial – None from annual reporting.
6.3 Legal – In line with statutory requirements of the Community Empowerment
(Scotland) Act 2015 and related Regulations.
6.4 HR – None.
6.5 Fairer Scotland Duty 
Page 172

Page 173

5 
6.5.1 Equalities – Protected characteristics – None.
6.5.2 Socio economic Duty – None.
6.5.3 Islands – None
6.6 Climate change – None from annual reporting.
6.7 Risk – Failure to meet statutory requirements could have reputational
implications for the council. 
6.8 Customer Service – None. 
Douglas Hendry - Executive Director with responsibility for Commercial Services
Councillor Gary Mulvaney – Policy Lead, Finance and Commercial Services
Date: 27th June 2023 
For further information contact: 
Ross McLaughlin, Head of Commercial Services, 01436 658 914
David Allan, Estates and Property Development Manager, 01436 657 620
David Rennie, Partnerships Development Officer, 01700 501 371 
Page 173

Page 174

6 
Appendix 1 
Current Active Expressions of Interest (as at 21st June 2023) 
It should be noted that the Council has continued to engage with community groups who
have had EOI’s active for a significant period of time and while they remain active the
requesters have not yet moved them on. 
No Organisation Asset Summary of Expression
of Interest
Current Status
1 Mid Argyll
Rugby Club
(MARC)
Kilmory Pony
Park show
ground
Request to lease the
ground for development of
rugby facilities.
Terms agreed with MARC
and approved internally.
Access arrangements under
discussion prior to
conclusion of lease.
2 Kirkmichael
Community
Development
Group
Kirkmichael
Park
Changing
Room
Request to lease pavilion
and grounds for use as an
office and to deliver wider
services.
Group are being supported
to develop their business
plan for the proposal. 
3 Scenic
Sandbank
Former
Teacher
Centre
Sandbank
Request to purchase the
site and develop a
community garden.
Group successful in Land
Fund application. Terms for
sale agreed and reported to
DMT on 3/7/23. Legal
Services to be instructed
thereafter.
4 South Islay
Development
Ramsay Hall Request to lease the
building to redevelop the
facility and operate the
services.
Group are pulling together a
funding package to develop
the asset to be suitable for
running an under 5’s
nursery in the Hall. 
5 Rhu and
Shandon
Community
Centre
Rhu
Community
Centre
Request for lease to assist
in applying for
development funding for
the building
Terms are under discussion
but the approach requires to
be consistent with other
halls / community facilities.
Support is being provided to
the group.
6 Kilfinan
Community
Forest
Company
(KCFC)
Tighnabruaic
h Primary
School
Grazings
access
Request to acquire ground
to formalise access.
Group assisted to secure an
independent valuation and
are applying to the Land
Fund to support the
acquisition of the ground.
Land Fund application has
been submitted awaiting
results.
7 Isle of Jura
Development
Trust
Picnic area at
Craighouse
Pier, Isle of
Jura
Request for a lease of the
site to improve the
facilities.
Terms agreed with group for
a Licence, DMT approval
received and Legal Services
instructed.
8 The Dunoon
Project Ltd
Morag’s Fairy
Glen &
Request to acquire the
sites to support the
Initial investigations
completed and awaiting
Page 174

Page 175

7 
Bishop’s
Glen, Dunoon
delivery of the wider
project and improve the
public access and facilities.
further feedback from the
group. Significant project
which will take time to
develop.
9 Ardrishaig
Community
Food
Growing
Project
King George
V Park,
Ardrishaig
Request to lease part of
park as a community food
growing area.
Heads of terms to be
issued.
10  Ardrishaig
King George
V Community
Park
Association 
King George
V Park,
Ardrishaig
Request to develop the
facilities and maintenance
arrangements of the park
Group are being supported
to develop their request.
11 Dunoon
Youth
Football
League
Black Park,
Dunoon
Request to bring back into
use the green football pitch
on the Black Park site
working in partnership with
the Council and Live Argyll 
Initial licence to reopen
changing rooms is
underway. A meeting with
funders to restore the
playing field are set to take
place in July 2023.
12 Dunoon Pipe
Band
Dunoon Pipe
Band Hall,
Dunoon
Request for a new lease of
the hall.
Group are being supported
to develop their request.
13 Princess
Louise Hall
Committee
Princess
Louise Hall &
Howie
Pavilion,
Rosneath
Request for new lease of
hall and pavilion
Heads of terms nearing
completion and to be
reported to DMT in July
2023.
14 Jura
Development
Trust
Jura Roads
Yard,
Craighouse
Pier, Isle of
Jura
Request to acquire yard to
expand the group’s
adjacent business.
Depot is required
operationally so would
require an alternative
location if closed. Group
seeking alternative options.
15 Oban Lorne
RFC
Glencruitten
playing fields,
Oban
Request to lease / acquire
playing fields and
clubhouse and to develop
new facilities
Heads of terms under
discussion with the club. On
agreement in principle will
be reported to DMT for
consideration.
16 Lismore
Community
Trust
Lismore Pier,
Isle of
Lismore
Request to acquire pier
facilities and public toilets
Initial investigations are
under way to confirm the
best way forward for the
group.
17 Isle of Bute
Seasports
Club
Seasports
club house /
store.
Request for new lease of
site and clubhouse 
Initial details are being
gathered to support the
group.
18 Balemartine
Community
Garden
Association
Balemartine
Schoolhouse
Playing field
Request to develop vacant
site into Community
Garden for local residents
Initial investigations are
under way to confirm the
best way forward for the
group.
Page 175

Page 176

8 
19 Argyll and the
Isles Coast
and
Countryside
Trust
Land
adjacent to
Kilmory
Castle car
park
Request to relocate their
base of operations into the
Kilmory Estate
Initial investigations are
under way to confirm the
best way forward for the
group.
20 Land at
McCalls
Terrace Oban
Keep Oban
Beutiful
Request licence to look
after a small strip or woods
on behalf of the
community.
Initial investigations are
under way to confirm the
best way forward for the
group. 
Page 176

Page 177

ARGYLL AND BUTE COUNCIL                                         POLICY AND RESOURCES 
DEVELOPMENT AND ECONOMIC                        10 AUGUST 2023 
GROWTH                     
UK LEVELLING UP FUND – GOVERNMENT FEEDBACK 
1.0  EXECUTIVE SUMMARY 
1.1 This report provides a copy of the feedback from the UK Government (attached
at Appendix 1 and 2 of this briefing) on the two bids that were submitted by the
Council to the UK Government.  The report also provides an overview of the
Lessons Learned session undertaken with the group of officers who were
developing the two bids.   
1.2 It is understood that the UK Government are shortly to announce a third round of
Levelling Up Funds and have signaled a new approach will be taken.  This may
mean the ending of the competitive bids process and a direct allocation to each
eligible area.  At the time of writing this report there is no indication on what the
level of these funds will be and what criteria will be applied to the funds. It should
be noted that the last round of Levelling Up distributed £2.3 bn and it is further
understood there may be around £1bn of funding left. Although this may change
if the Government decides to increase the monies available. 
1.3 The report, therefore, looks to prepare for a future round three by seeking
delegated authority to move forward promptly and to authorise expenditure on
future consultant support to assist in the bidding/project preparation process.  In
addition, the report identifies projects that are considered by officers of the council
to have the best chance of success in relation to existing criteria and welcomes
Members’ views on what project areas they would like to see explored further and
targeted for the next round of funding.   
RECOMMENDATIONS 
It is recommended that Members:- 
a) Consider the feedback by the UK Government on the two submitted
Levelling Up Bids.  
b) Agree the principle of prioritising a single project from elements previously
identified in Round 2 as a Round 3 submission of the UK Government Levelling
Up Fund. 
Page 177 Agenda Item 8

Page 178

c) Agree that the Chief Executive and the two Executive Directors are delegated
authority to approve the final bid submissions after consultation with the Leader,
Depute Leader and Leader of the largest Opposition Group. 
d) Agree that the funds previously allocated by the Council in the sum of £150k be
utilised to support the use of consultants to help with Bid/Project preparation. 
Page 178

Page 179

ARGYLL AND BUTE COUNCIL                                         POLICY AND RESOURCES 
DEVELOPMENT AND ECONOMIC                         10 AUGUST 2023
GROWTH                     
UK LEVELLING UP FUND – GOVERNMENT FEEDBACK 
2.0 INTRODUCTION 
2.1 This report brings Members up to date with the feedback from the UK
Government on the two Levelling Up Bids that were submitted last year as
part of round two of the fund. The feedback is contained in Appendix 1 and 2
of this report together with the findings of Officer feedback in Appendix 3 of
this report. 
2.2 A further round of funding (round 3), will be announced by the UK
Government imminently, although at the time of writing this report it is unclear
if it will be a competitive process or more likely an allocation of funds. There is
also no certainty on the criteria to be applied or the amount of funding that will
be available which makes the choosing of future projects challenging. 
Allocated funds would have to comply with Treasury 5 Business cases that
require a considerable amount of evidence and justification to score highly. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that Members:-
a) Consider the feedback by the UK Government on the two submitted
Levelling Up Bids.  
b) Agree the principle of prioritising a single project from elements previously 
identified in round 2 as a  Round 3 submission of the UK Government
Levelling UP Fund. 
c) Agree that the Chief Executive and the two Executive Directors are
delegated authority to approve the final bid submissions after consultation
with the Leader, Depute Leader and Leader of the largest Opposition
Group. 
d) Agree that the funds previously allocated by the Council in the sum of
£150k be utilised to support the use of consultants to help with Bid/Project
preparation. 
Page 179

Page 180

4.0  DETAILS 
4.1 FEEDBACK FROM THE UK GOVERNMENT 
The Council chose to submit two bids to the UK Government in round Two of
the Levelling Up competitive bid process after choosing not to submit in round
one.  The UK Government provided £125k to assist with the bidding process
and this helped prepare our bids internally with assistance of external
consultants as appropriate. The total bids submitted was circa £70m focussing
on regeneration in Rothesay and Dunoon (Western Seaboard Marine
Gateways) together with a transport bid (Connected Argyll) focussing on
Islay/Jura and North Lorn. Unfortunately, both our bids were ultimately not
successful. 
The Council received feedback from the UK Government on each bid, in March
of this year, and this feedback was provided to the ELT and Policy Leads of the
council.  The Executive Director also had further discussion with UK Officials at
a separate meeting and feedback on this is included in the report. 
The levelling Up assessment process was undertaken by numerous teams from
the UK Government and feedback has focused on areas of strength and areas
that can be improved on.  Each feedback document is attached at Appendix 1
and 2 of this report and is summarised in para. 4.5.   
4.2  LESSONS LEARNED   
Prior to the feedback from Government a session took place with a number of
officers on the 3rd November 2022 and was Chaired by the Executive Director
with responsibility for Development and Economic Growth.  Officers were
provided with a Miro Board link a number of weeks in advance of the meeting,
and were asked to provide comments in relation to four questions posed. 
Officers were also given time during the meeting to discuss the questions, and
the comments submitted.   
The four questions were as follows:- 
 What do you think went well;  
 What do you think could have gone better; 
 What actions do you think we should take from this; and 
 What do you think we should change for any future rounds of funding/bids.   
List of the officers comments are attached to this report at Appendix 3.   
4.3  FEEDBACK SESSION WITH GOVERNMENT LEVELLING UP FUND TEAM –
MARCH 2023 
The Executive Director attended a session with the Government’s Levelling Up
Team where they shared their analysis of Scottish bids submitted to Round 2
Page 180

Page 181

of the Levelling Up Fund, and asked for insight from those in attendance into
how they could help Local Authorities across Scotland to develop stronger bids
and increase success in future funding rounds.  Some comments from the
session are noted below:- 
 Scotland had 54 bids:- 
o 19 failed economic case
o 11 failed value for money
o 13 failed on deliverability
o 30 bids passed the assessment
o 24 in total failed 
 Suggestion that Scotland was not as good at submitting a robust green
book business case.
 Round 3 is likely to be an allocative funds process, it will however still be
linked to green book business case.  
 The LUF team are keen to look at what were the issues and what would
help to bring Scotland’s overall scores up. 
 It was suggested that for the successful bids in Scotland, officers had
recently attended a Green Book Business Training Course (Argyll and
Bute Council officers had also done this – please see 2.4 below).  
 It was unclear whether our scores were influenced due to our submission
being a package bid split over a number of different areas and project
elements.   
4.4  TREASURY GREEN BOOK 
The Green Book is guidance issued by HM Treasury on how to appraise
policies, programmes and projects. It also provides guidance on the design
and use of monitoring and evaluation before, during and after implementation. 
Appraisal of alternative policy options is an inseparable part of detailed policy
development and design.  This guidance concerns the provision of objective
advice by public servants to decision makers, which in central government
means advice to ministers. 
A number of our staff attended the Treasury Green Book training course in
March 2019.  The view of officers was that this course was too theory based
and lacked practical application of the theory, where examples in Argyll and
Bute Council could have been used.  It should be noted however we
employed consultants with extensive experience in the Green Book process
to help Officers with the bids. 
4.5 SUMMARY OF FEEDBACK 
Officers have summarized the feedback from the UK Government below and
this is being used to inform our next steps.  It should be noted that is very
difficult for the council to demonstrate as a rural authority the economic and
social outcomes required by a Treasury 5 Business case which ultimately
Page 181

Page 182

impacts on the overall score that can be achieved.   
In terms of the Regeneration Western Seaboard Marine Gateways Bid limited
feedback was given and whilst there was a lot of positive comments relating
to the strategic fit of the bid a number of significant weaknesses were
identified. 
 Limited evidence of alignment with cultural and heritage strategies. 
 More details required on demonstrating Net Zero. 
 The evidence and analysis was limited to high level statistics. 
 There was no evidence of match funding provided, even from the private
sector party who were expected to contribute around £1.3m worth of
funding. 
 No overarching delivery plan was provided. 
Overall the issue with the two elements of this bid was it was very difficult to
provide the necessary economic and social outcomes required given the split
over two communities/locations. 
In terms of the Transport Connected Argyll bid. 
 There is a need to undertake an economic appraisal of the highway
schemes that is in line with TAG, for example the impact on journey times
and accidents. 
 There is a need to undertake economic appraisal of the active mode
schemes, for example using active mode appraisal toolkit (AMAT).   
 There is a need to deliver a spend profile across the full construction
period for capital expenditure.  This should include an appropriate level of
inflation for each year that costs are incurred and be discounted to the
PVC base year. 
 Applying optimism bias at a level that aligns with TAG.   
 There were significant gaps in the deliverability section of the bid that needed to
be evidenced to strengthen the bid. The budget needed more detail and more
evidence on how we were to secure the match funding. 
 The procurement approach evidenced was too general and a more
specific strategy for the bid with a detailed project delivery plan would have
strengthened it. 
 While the bidder evidenced a track record of delivering projects of this type
and scale, there was insufficient information attached to the delivery plan
Page 182

Page 183

included with the bid and details on this and the background, roles and
responsibilities of the project team were expected. 
 The monitoring and evaluation (M&E) element of the bid could be
improved by providing detailed metrics for data collection (for example,
how will a reduction in congestion or carbon be measured?) 
 Providing details on how the data to be collected will be used to monitor
the impact of the scheme and whether it will be measured against baseline
conditions or a counterfactual scenario would also have improved the
M&E, as would providing timescales for data collection that are sufficient
to capture the full impact of the anticipated outcomes. 
4.6 NEXT STEPS 
The UK Government have confirmed that there will be a future round three of
Levelling Up Funding.  However this funding is to be distributed (bidding
process, or allocation) it will have to comply with treasury Five Business cases,
require a level of at least 10% match funding, and timescales for preparation
will be tight. Consequently, it is right to start preparations for this process now
despite no clarity on the amount of monies available or criteria.  Looking at our
previous bids and taking into account feedback received internally, and
externally, there is a need to consolidate our project list and address the
identified gaps in our submitted business cases.   The level of bids we went for
is certainly a factor we need to take account of as no Authority in Scotland
received anything close to the £70m that the Council applied for. The Council
needs to recognize that there is a greater chance of success to bid for a lesser
amount and that there will consequently be a requirement to focus on a single
element of our previous bids with the best chance of success aligned to UK
Government criteria, as yet unpublished.  If the round three criteria does
however change other project ideas may have to be considered. 
Officers consider that the projects with the best chance of success are elements
of the Dunbeg Corridor and the UAV Hub that both enjoy match funding and
have progressed significantly since the submission of round 2 with further
economic justification, environmental studies and transport analysis.
Alternately, the development of the Jura Ferry and Port improvements could be
a bid on its own right.  In terms of the regeneration projects, there would be a
need to focus on one specific location and add value to the bid previously
presented and also secure match funding which in itself is challenging for the
council at this time. 
To help us prepare for the round three announcement it’s requested:-
- Members agree the principle of prioritising a single project from elements
previously  identified in round 2 as a  Round 3 submission of the UK
Government Levelling UP Fund;
- That the funds previously allocated by the Council in the sum of  £150k be
utilised to support the use of consultants to help with Bid/Project
preparation.; and   
Page 183

Page 184

- That the Chief Executive and the two Executive Directors are delegated
authority to approve the final bid submissions after consultation with the
Leader, Depute Leader and Leader of the largest Opposition Group 
5.0 CONCLUSION 
5.1  This report provides the feedback from the UK Government on both bids
submitted by the Council (contained in Appendices 1 and 2) together with officer
observations of the process undertaken in Appendix 3. The report also provides
an update on the Levelling Up Fund Lessons Learned session attended by the
Executive Director in March 2023 with UK Government levelling Up Civil
servants. 
5.2  The feedback, also summarized in the body of the report, reflects the huge efforts
by Officers and our consultants made to submit the bids on time to the UK
Government given the scale of the information and justification required. It seems
that our use of package bids proved very challenging to deliver the
economic/social outcomes the Government required and this needs to be a factor
to be taken into account when considering new projects. The availability of
council, and external consultant resources, to help with this process is another
significant factor to be taken into consideration and this is why the report seeks
approval for £150k funding to secure consultants to help with the process. There
is also a need to seek delegated authority to ELT, the Leader of the Council the
Depute leader, and the Leader of the main opposition to help speed up the
process as timelines will no doubt be very tight going forward. 
6.0 IMPLICATIONS 
6.1 Policy – Levelling Up Bids will need to align with Government criteria and the
priorities of the Council. 
6.2 Financial – This report requests £150k of funding to employ consultants as
necessary to help the bidding/project preparation process as appropriate. This
funding will be taken from council priorities fund.  The last round of funding
required a minimum of 10% of match capital funding. No match funding is
however requested through this report and every effort will be made to align
bids with existing revenue/capital commitments. 
6.3 Legal – None. 
6.4 HR – Internal staff resources with be required together with external consultant
support as required. 6.5 Fairer Scotland Duty: 
6.5.1 Equalities - protected characteristics - None as yet as no projects have been
identified. 
6.5.2 Socio-economic Duty – None as yet as no projects have been identified. 
Page 184

Page 185

6.5.3 Islands – None as yet as no projects have been identified. 
6.6 Climate Change – Projects will have to comply with the need to deliver net zero. 
6.7 Risk – The risk relates to the costs of submitting unsuccessful bids. 
6.8 Customer Service – None. 
Kirsty Flanagan, Executive Director with responsibility for Roads and
Infrastructure and Development and Economic Growth   
APPENDICES 
Appendix 1 – Feedback from the UK Government on Connected Argyll and Bute Bid 
Appendix 2 – Feedback from the UK Government on Western Seaboard Marine
Gateways Initiative 
Appendix 3 – Officers Lessons Learned Feedback 
Page 185

Page 186

This page is intentionally left blank

Page 187

APPENDIX 1 – FEEDBACK FROM THE UK GOVERNMENT ON CONNECTED
ARGYLL AND BUTE BID 
LUF20203 - Connected Argyll and Bute  
Argyll And Bute│Scotland │Transport   
Bid Summary:  
Focusing on a net zero approach to regeneration this bid proposed 2 projects: 
1. Islay/Jura Whisky Islands transform 2 key roads (A846 and B8016); new active
travel route; additional marshalling capacity for LGVs; low emission replacement
ferry with increased capacity; and port infrastructure upgrades.   
2. North Lorn Economic Growth Zone  trunk road junction works; new service area
development road; new commercial area development platform. Oban airport -
creation of a new Advanced Aviation Mobility Hub; extend existing helipad; install
LED on runway; anti-glare solar panels and new Green Hanger; and introduce
green hydrogen fuel to Oban through provision of storage tanks; hydrogen
dispensers; and hydrogen bus purchases. 
Headline:  
This bid provided a strong Strategic Fit element but more details and evidence was
required in the Economic Case and Deliverability section to make this a stronger bid.  
Assessment Overview   
  
Strategic Fit: 
The council provided a detailed bid that clearly set out the local challenges and how
the LUF grant would be used to overcome them, and identifying how a thriving
whisky industry has the potential to transform the region but is being impeded by the
existing transport networks. Similarly, the bid set out how new housing, enterprise
and R&D zones on the mainland will only flourish if the proper infrastructure is in
place to support them. However, the bid lacked evidence of the demand for an
improved active travel route on Islay.    
The council highlighted that concerns were raised during the consultation that the
region's weather might make greater UAV use unlikely. 
The bid included plans to establish a market for hydrogen fuel that were interesting
and innovative, and seemed well-thought through.  
 
Economic Case:  
This section will outline the economic dimension feedback, whilst we have tried to
make this as accessible as possible it is also important that it stays specific and
technical to allow it to be insightful and actionable. It is therefore recommended that
you should share this feedback with whoever authored the economic dimension if
anything is not clear. If this is not possible DfT can provide a high level non-technical
Page 187

Page 188

summary on request. The feedback is framed as areas to improve and will not touch
on the areas your economic dimension excelled at. The bid would have been
improved by: 
- Providing details of the problem with the current transport network, supported by
evidence such as traffic flows, journey times or evidence of congestion on key
routes.  Traffic data should demonstrate that it is representative of current
conditions and that it has been collected by methods which are aligned with
Transport Analysis Guidance (TAG). 
- Providing details on what the elements of the scheme consist of, such as the
active travel measures 
- Providing evidence on how the transport measures will address existing and
future transport related issues, for example in terms of the impact on travel times
and accidents.  The future travel demand should be forecast using an appropriate
methodology that aligns with TAG.   
- Undertaking an economic appraisal of the highway schemes that is in line with
TAG, for example the impact on journey times and accidents. 
- Undertaking an economic appraisal of the active mode schemes, for example
using active mode appraisal toolkit (AMAT).   
- Presenting a spend profile across the full construction period for capital
expenditure.  This should include an appropriate level of inflation for each year
that costs are incurred and be discounted to the PVC base year. 
- Applying optimism bias at a level that aligns with TAG.    
Deliverability: 
There were significant gaps in the deliverability section of the bid that needed to be
evidence to strength the bid. The budget provided was high-level and required
refinement and more evidence needed to be provided on securing the match
funding. More evidence was also needed as to demonstrate that the Islay
Community Access Group had the skills and experience to deliver the capital
expenditure over a three year period. 
The procurement approach evidenced by the applicant was too general and a more
specific strategy for the bid with a detailed project delivery plan would have
strengthened it. 
While the bidder evidenced a track record of delivering projects of this type and
scale, there was no delivery plan included with the bid and details on this and the
background, roles and responsibilities of the project team were expected. 
The monitoring and evaluation (M&E) element of the bid could be improved by
providing details metrics for data collection (for example how will a reduction in
congestion or carbon be measured?).
Page 188

Page 189

Providing details on how the data to be collected will be used to monitor the impact
of the scheme and whether it will be measured against baseline conditions or a
counterfactual scenario would also have improved the M&E, as would providing
timescales for data collection that are sufficient to capture the full impact of the
anticipated outcomes. 
Page 189

Page 190

This page is intentionally left blank

Page 191

APPENDIX 2 – FEEDBACK FROM THE UK GOVERNMENT ON WESTERN
SEABOARD MARINE GATEWAYS INITIATIVE 
LUF20344 - Argyll and Bute Western Seaboard Marine Gateways Initiative -
Rothesay and Dunoon   
Argyll And Bute │Scotland │Regeneration and Town Centre │ £20,000,000 
Bid Summary:  
These proposals will improve the marine gateway areas, visitor arrival areas and
associated infrastructure in Dunoon and Rothesay.
The proposals, which complement recent regeneration efforts, will transform the
experience of arriving or leaving these two important, but fragile, Clyde-waterfront
towns.
Improvements will be made to key heritage assets, infrastructure, public realm and
green spaces combined with active travel and net zero interventions.
These interventions will positively change the visitor experience, increase dwell-time
and visitor numbers. Proposals also seek to address localised inequalities and
positively impact on income, land values and health & wellbeing providing places
that meet local needs.
Headline: 
This bid had significant weaknesses. There was limited evidence of alignment with
cultural and heritage strategies, and it was unclear how the economic benefits had
been calculated. The bid also lacked a procurement strategy, an overarching
delivery plan, and a formal M&E plan. 
We have provided more specific feedback below. This has been drafted to be as
clear and helpful as possible to inform future funding applications   
Assessment Overview 
Strategic Fit: 
The bidder demonstrated good levels of engagement with the majority of relevant
stakeholders, including engagement with those who don’t usually engage, such as
school groups. The engagement clearly helped to shape the final bid, with key
priorities identified in the 2016/2017 charrettes, and objectives refined during the
2022 workshops. The applicant had also displayed commitment to engaging
stakeholders as proposals move through the next design stages and had noted in
the risk register how any future local concerns can be mitigated. 
The bid provided context and credible evidence of the local challenges/barriers to
growth, and strongly demonstrated how the proposed interventions would address
issues such as population decline, the need for key-worker housing, and
regeneration of key heritage assets.    
Page 191

Page 192

The preferred solution for redevelopment of the Royal Hotel was clearly based on a
variety of considered options, however, it was not clear on revenue generation for
ongoing maintenance, and/or rental receipts. There was explanation of intention for
other public and private funding to be leveraged, however, this could have been
explained more fully. 
The two component elements of this package bid were very clearly aligned in their
aims to revitalise areas in need of investment, bring derelict buildings back into
active use, preserve heritage assets, and improve community wellbeing and visitor
experience. 
The bid demonstrated strong evidence for alignment with both local and national
growth and development strategies. However, there was limited evidence provided
of alignment with cultural and heritage strategies both locally and nationally. 
Additionally, the bid did not clearly evidence whether there was a relevant cultural/
heritage or sports/ community hub strategy in place. There was linkage to UK legal
and statutory commitments, such as delivering Net Zero and minimising
environmental impact, but this was lacking some specifics. 
The response briefly set out how the bid aligned to and supported investments from
other relevant funding streams. This was particularly strong with reference to Rural
Growth Deal Funding, however, there was limited detail offered on other sources of
funding. 
Overall, the bid demonstrated strong evidence for supporting Levelling Up White
Paper Missions and alignment with local growth and development strategies. Efforts
to engage the community and address areas of blight within the town centres were
clearly articulated, as were the bid’s aims to improve quality of life, increase social
interaction, and restore pride in place, with potential to have a transformative effect
on the wider Argyll and Bute region.   
Economic Case:  
There was some good analysis of issues such as population decline and falling
visitor numbers however the evidence and analysis was limited to high level
statistics. To demonstrate the scale of the issue better use could have been made of
data on footfall, ferry passengers, sector composition (employment and turnover),
demographics, labour market, commercial property market, etc. Data needed to
better contextualise by comparing trends over time to those of similar areas and to
national performance. There was some survey data used however the sample sizes
appeared small and the previous economic studies linked to were outdated. 
The Theory of Change listed outcomes which were consistent with the discussed
outputs, in particular higher visitor numbers and commercial expenditure.
Assumptions around anticipated visitor number changes and how these would be
driven by the proposal could have been better explained. More evidence could have
been referenced to link these outcomes to improvements in living standards (a major
issue identified in the bid), and analysis to show the significance of these impacts. 
Page 192

Page 193

It was unclear how the economic benefits had been calculated. Although high level
assumptions had been described in the application and in Annex T there was no
description of how these had been applied in practice. The benefits appeared high
given the scale of the proposals (in particular the GVA benefits) and had been
arbitrarily divided between the projects. Appraisal period for employment effects was
described as 15 years in the explanatory note but was costed over 30 years in the
workbook. As per the departmental appraisal guidance, the GVA approach is no
longer recommended. The preferred way to monetise benefits is through the use of
Land Value Uplifts. The economic costs appeared to have been calculated correctly
from the financial case. 
Deliverability: 
There were a number of issues with the financial information presented. There was
no evidence of match funding provided, even from the private sector party who were
expected to contribute around £1.3m worth of funding. The expenditure profile was
only broken down to a very high level and, in more than one place, several items
seem to have been combined into one line. The approach to some key risks was
either missing (e.g., match funding contributions) or not appropriate (e.g., meeting
the UK government in the eventuality that inflation impacts costs). 
The bid did not contain a procurement strategy. There was a reliance on the use of
corporate and Scottish Government level initial guidance. While these were relevant,
they did not represent in and of themselves a procurement strategy for these
projects. There was no real sense of the procurement options, which was the
preferred route, or which risks needed to be managed. The answer on contractor
and supplier engagement simply signposted to a corporate document. 
No overarching delivery plan was provided, and this was a weakness of the bid.
Some component parts of what would be expected in a delivery plan were present -
for example the delivery programme provided as an annex was a strength of the bid.
Because of the lack of a delivery plan, in other areas - such as governance and
resourcing - the information given was too high level. 
Within the monitoring and evaluation (M&E) plan, there was some discussion of
governance arrangements and approach however the bid lacked a formal M&E plan.
The applicant could improve the plan by identifying key research questions and key
metrics they seek to monitor. 
Page 193

Page 194

This page is intentionally left blank

Page 195

APPENDIX 3 – OFFICERS LESSONS LEARNED FEEDBACK   
A session took place with a range of officers online on 3rd November 2022 and was
Chaired by the Executive Director.   
The four questions were as follows:- 
 What do you think went well;  
 What do you think could have gone better; 
 What actions do you think we should take from this; and 
 What do you think we should change for any future rounds of funding/bids.   
What do you think went well?   Two bids were submitted with a potential
investment of £50m for Argyll and Bute 
Aspects of public engagement 
Ability to achieve tight deadlines – especially
when issues arose such as the Government
portal was delayed 
Showcased the dedicated staff 
Knowledge and skillset of employees was crucial
in developing works 
What do you think could have
gone better? 
UK Government timeframe reduced capacity to
develop bids as much as would have preferred 
More team working approach across different
services 
No definitive resource to take forward large
projects – officers required to continue “day job” 
Difficulty of procuring consultants/experts –
consultants did not have the capacity to
undertake the work required and this resulted in a
lot of “hand holding” from officers 
Dedicated lead officer(s) identified from the outset 
What actions do you think we
should take from this? 
Look at how we can better place ourselves to
respond to future calls for funding of this nature
i.e. undertake scoping and design work in
advance 
Revisit list(s) of Council priorities on a regular
basis to ensure there is a priority list of agreed
projects to take forward – gain more transparency
in involving a wider range of staff and ensure that
there is political soundings on these at the outset
– this would result in “shovel ready” projects 
Better promotion of the work undertaken and
what the Council are trying to achieve for the area
– showcase the work the Council are doing 
Clarify resources required at the outset of funding
calls of this nature to ensure there is a project
team approach from start to finish 
Page 195

Page 196

Better communication internally – perhaps
“working group” should be set up for future rounds
of funding 
Look at how we develop our staff alongside
balanced workloads to get the best out of
resource 
What do you think we should
change for any future round of
funding/bids?  
Look at a list of approved projects for any future
rounds of funding which can be scoped and
designed 
Secure buy in across the council at the beginning
of development to ensure the necessary support
is committed and available 
Councillor engagement to approve projects at the
outset – this will ensure that projects being
worked on are approved and reduced the time
officers spend before approval 
Reduce the spread of projects across
geographical areas – this provides more
challenges and there should be a focus on what
would be transformational for the area, towns and
the people 
Step up political lobbying from Members is
needed 
More community consultation – note that
timeframes set by Government do not always
permit time for a full public consultation – this will
allow co-design working with communities direct 
Page 196

Page 197

ARGYLL AND BUTE COUNCIL            POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND 
ECONOMIC GROWTH                                          10 AUGUST 2023 
PLACE BASED INVESTMENT 2023/24 – PBI PROJECTS AND ALLOCATION 
1.0 EXECUTIVE SUMMARY 
1.1 Argyll and Bute Council has been allocated £496,000 for financial year
2023/24 from Scottish Government, via its Place Based Investment (PBI)
Programme. The purpose of this report is to seek members formal approval to
the projects to be supported via this year’s PBI funding allocations as detailed
in Table 1. 
1.2 This report follows on from the email communication to all Elected members
from the Executive Director with responsibility for Development and Economic
Growth suggesting projects that could be funded by PBI and seeking
members views on these and other suggestions which would fit within the
funds criteria and timeline. 
1.3 The report also highlights that members will require to give consideration to
the Crown Estate (CE) funding for 2023/24. Whilst the Council has not yet
been advised of the formal allocation for CE for 2023/24 it is considered,
based on previous year’s allocations, that a prudent estimate of £1.0m of
anticipated funding in 2023/24, should be considered. 
1.4 The approach being taken reflects the decision taken at the Policy and
Resources Committee in August 2022 whereby it was agreed that
suggestions for future years of Placed Based Investment and Crown Estates
funding were welcomed from all Elected Members, and that it would be
beneficial for any future options to be discussed by Elected Members. 
RECOMMENDATIONS 
It is recommended that Policy and Resources Committee:- 
a) Agree to the allocation of the Place Based Investment funding for 2023/24
to the projects in Table 1, paragraph 4.8.
Page 197 Agenda Item 9

Page 198

b) Note that the Executive Director with responsibility for Development and
Economic Growth will consult with all Elected Members via email to seek
suggestions for potential projects that would fit with the Crown Estate
2023/24 funds criteria and timeline. 
c) Note that, following consultation with all elected members as detailed
under b) above, a further report on the proposed allocation of the Crown
Estate Funding for 2023/24 will be brought forward to the 12th October
meeting of the Policy and Resources Committee. 
Page 198

Page 199

ARGYLL AND BUTE COUNCIL            POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND 
ECONOMIC GROWTH                      10 AUGUST 2023 
PLACE BASED INVESTMENT 2023/24 – PBI PROJECTS AND ALLOCATION 
2.0 INTRODUCTION 
2.1 The council has been allocated £496,000 from Scottish Government for
financial year 2023/24 for capital ‘place’ regeneration projects. 
2.2 The purpose of this report to ask members to agree the allocation of Argyll
and Bute Place Based Investment (PBI) for 2023/24 as detailed in Table 1. 
2.3 The projects proposed are considered to fit strongly with the PBI criteria,
deliver on the Council’s Economic Recovery Strategy, are time critical, add
value to investment that has already been made by the Council, deliver on our
regeneration outcomes for our places, take account of available officer
resources and take account of the relatively tight timeline that we need to
meet to align with the funding. 
2.4 The purpose of this report is also to highlight to members that consideration
will also need to be given to Crown Estate (CE) funding that is expected within
2023/24. Although the CE allocation for 2023/24 is not yet confirmed, in
previous years it has been recommended that the Council could commit up to
£1.0m of anticipated funding in advance of formal notification and this would
again be recommended for 2023/24.     
2.5 In order to advance this process and as agreed at the Policy and Resources
Committee in August last year, it is proposed to follow the approach taken in
regard to PBI whereby the Executive Director with responsibility for
Development and Economic Growth seeks suggestions for potential projects
which would fit within the CE funds criteria and timeline from all Elected
Members. As with PBI this will be done via email communication and a report
will then be brought back to the October meeting of the Policy and Resources
Committee for formal approval of the proposed projects and CE funding.   
3.0 RECOMMENDATIONS 
3.1 It is recommended that Policy and Resources Committee: 
Page 199

Page 200

a) Agree to the allocation of the Place Based Investment funding for 2023/24
to the projects in Table 1, paragraph 4.8. 
b) Note that the Executive Director with responsibility for Development and
Economic Growth will formally consult with all Elected Members via email
to seek suggestions for potential projects that would fit with the Crown
Estate 2023/24 funds criteria and timeline. 
c) Note that, following consultation with all elected members as detailed
under b) above, a further report on the proposed allocation of the Crown
Estate Funding for 2023/24 will be brought forward to the 12th October
meeting of the Policy and Resources Committee. 
4.0 DETAIL 
4.1 The 2020 Programme for Government committed to establishing a Place
Based Investment Programme (PBIP), linking and aligning place-based
funding initiatives. Scottish Government confirmed that Local Government
would be receiving a share of the PBIP funding over a 5 year period, including
the initial year 2021/22, to support and advance place-based investment and
build on the strong partnership currently existing through the Regeneration
Capital Grant Fund.  As has been the case this year, Argyll and Bute Council
will receive a share of this capital funding over the next 4 years. 
4.2 Argyll and Bute Council’s allocation for year 1 (2021/22) was £821,000. The
Council’s allocations for year (2022/23) was £714,000. The allocation for
2023/24 is £496,000. 
4.3 The main objectives of the PBIP are:- 
 to link and align place-based initiatives, and establish a coherent local
framework to implement the Place Principle; 
 to support place policy ambitions such as town centre revitalisation,
community led regeneration, 20 minute neighbourhoods and Community
Wealth Building; 
 to ensure that all place-based investments are shaped by the needs and
aspirations of local communities; and,
 to accelerate our ambitions for net zero, wellbeing and inclusive economic
development, tackling inequality and disadvantage, community
involvement and ownership. 
4.4 The challenge in respect of the fund is to identify projects that meet the place-
based criteria, and are able to be delivered within short timeframes with our
limited staff resources. Projects to be delivered under the 2023/24 allocation
need to be delivered in a 9 month period and therefore need to be sufficiently
well advanced in terms of their development, straightforward to deliver and/or
be ready to start on site, or be able to be delivered by a third party. 
Page 200

Page 201

4.5 Under the PBI allocation for 2022/23 the council supported a total of 9
projects, under PBI 2021/22 the council supported a total of 7 projects and
prior to the commencement of PBI funding the council supported a total of 28
projects under the previous SG Town Centre Funding stream.  As a number
of those projects being supported through the previous year’s allocation are
ongoing, the key issue has and continues to be the availability of internal
resources to develop and deliver new projects. Further updates on the
projects supported by previous years PBI allocations will be provided at the
EDI committee on 31st August under the 6 monthly Large Scale Project report. 
4.6 As with previous year’s PBI funding the focus for this year’s PBI fund has to
be on projects that are at delivery stage, and can definitely be delivered. The
projects need to fit with the PBIP criteria, have the ability to build on previous
investments, and require the resources to be in place to ensure delivery within
the timescales required by the Scottish Government. The projects identified in
Table 1 have therefore been selected on the basis that they are focusing on
projects that are well advanced and there is a time constraint associated with
them and they can be readily taken forward to meet the PBI timelines, and for
the added value that they can offer to our communities. 
4.7 Following the email communication issued by the Executive Director to all
elected members two further projects were suggested by members as being
possible for PBI funding. Unfortunately after consideration both projects did
not fit with the criteria or timeframe as set out under PBI. These have
therefore not been included in the table as potential projects to be supported
by PBI. 
4.8 The proposed projects and associated allocation for PBI are listed below in
Table 1. 
Table 1 Place Based Investment 2023/24 Allocation 
Project  Consideration
Fit with Criteria 
2023/24 
Place Based
Investment 
Dunoon Burgh Hall Trust - Phase
2 to enhance outdoor area and
build on phase 1 investment 
Strong fit with PBI – adds
value to existing funding
secured and previous
council support, deliverable
within time frame  
£74,500 
Dunoon CARS/LACER approach
- flexible fund to support
businesses with capital
improvements to
shopfronts/buildings building on
previous investment 
Strong fit with PBI – adds
value to existing funding
secured, council project,
deliverable within time
frame, resources in place 
£49,500
Helensburgh CARS - Shopfronts
- increase shop front intervention
Strong fit with PBI – adds
value to existing funding
£44,000
Page 201

Page 202

level and costs have also
increased therefore this 
additional funding would assist in
supporting more businesses
within the CARS area 
secured, deliverable within
time frame, resources in
place  
Helensburgh Skate park – council
currently considering options for a
site and working with group,
funding would be focused on
supporting this work and will help
facilitate a permanent solution for
the skate park 
Strong fit with PBI, related to
appeal of Helensburgh as a
place to live and visit, grant
to third party subject to site
confirmation and other
agreements.  This money
would be in addition to
temporary works funding. 
£80,000
Tobermory Worker
Accommodation - match funding
for recently successful Islands
Programme award 23/24 
Strong fit with PBI , council
project, adds value to
investment secured and
RGD, delivery, meets
timeframe, resources in
place 
£50,000
Bid4Oban - Shopfront scheme
and Oban signage – add to
previous investment and support
work of Bid and local businesses,
improve town centre 
Strong fit, support to
businesses, improve
appearance of buildings,
third party grant, meets
timeframe 
£60,000
Lochgilphead CARS - Shopfront
improvement scheme and high
level amenity project - add value
to existing investment, safeguard
buildings and allow a greater
number of businesses and
properties to be supported 
Strong fit with PBI – adds
value to existing funding
secured via Historic
Environment Scotland and
council, resource in place,
deliverable in timeframe
£100,000
Steel Beam Project/LACER
Shopfront improvements in
Campbeltown 
Strong fit with PBI – adds
value to existing funding
secured, council priority,
working with colleagues in
housing, support to
businesses, deliverable
within timeframe 
£38,000
TOTALS  £496,000 
4.9 The projects above have all been identified using the PBI criteria and
timeframe however it should be noted that issues can arise with any project
and some flexibility may be required if it becomes evident that timeframes
cannot be met. However updates will be provided on the PBI projects at the
October Policy and Resources Committee.
Page 202

Page 203

5.0 CONCLUSION 
5.1 The relatively tight timescales associated with the PBI fund, combined with the
large number of existing projects being delivered by the council, make for a
challenging place based investment programme. The initial projects
recommended in this report are focused on those that are time critical and fit well
with the net zero ambitions of the Council and Government together with the 20
minute neighbourhood/wellbeing context.  The proposed projects build on
investment already in place, or projects identified through existing Place based
work such as the Lochgilphead CARS or Helensburgh CARS. 
6.0 IMPLICATIONS 
6.1 Policy – There is a need to comply with the Scottish Government ‘place’ policies
as outlined in paragraph 4.3 and associated guidance for the Fund.  
6.2 Financial – The Scottish Government expect that any uncommitted funds by 1st
April 2023 will be returned to Scottish Government.    
6.3  Legal – None. 
6.4  HR – Resourced from existing staff. 
6.5  Fairer Scotland Duty:
6.5.1  Equalities - protected characteristics – None.
6.5.2  Socio-economic Duty – The Fund will support local economies through
place-based centre regeneration activity.
6.5.3  Islands – The Fund will support island economies through place-based
regeneration activity and has the potential to align with, and add value
to, the Islands Programme. 
6.6  Climate Change – None.   
6.7 Risk – In order for each project to progress to delivery stage, a fully let contract
must be in place by 31st March 2024. The projects will be continually monitored
to ensure that funds can be reallocated to another Place Based Investment
Fund project to avoid having to return any uncommitted funds to Scottish
Government at this time. 
6.8  Customer Service – None. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth 
Policy Lead for Strategic Development, Councillor Currie 
13 July 2023                                                 
Page 203

Page 204

For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Audrey Martin Transformational Projects and Regeneration Manager 
Tel: 0154 604180
Page 204

Page 205

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
10 AUGUST  2023 
ISLANDS COST CRISIS EMERGENCY FUND 2023/24 
1.0 EXECUTIVE SUMMARY 
1.1 The Island Cost of Crisis Emergency funding, which aims to help island
authorities take urgent action to support households through the cost of living
crisis, was set up in December 2022. In 2022/23 £1.4 million funding was
allocated. This year an additional £1 million funding has been identified for the
2023-24 financial year: Financial support for islanders - gov.scot
(www.gov.scot). The funding will be distributed to the six Local Authorities
with responsibility for islands through the 2023/24 Local Government
Revenue Grant. It brings the total support provided by the fund to £2.4 million. 
1.2 This funding is for 2023/24 financial year only, and will be allocated via a grant
offer across the six local authorities using 100% population basis as
recommended by the joint Scottish Government/COSLA settlement
Distribution Group approved by the COSLA political Leaders. 
1.3 The allocation to Argyll and Bute for 2022/23 was £197,000 and the funds
were distributed as detailed in Table 1 below. The allocation for 2023/24 is
£141,000 however at the time of writing formal notification is still awaited in
regard to any details of the fund.   
1.4 Local authority decisions on where funding will be directed should be based
on their local knowledge and understanding of the impacts of the cost crisis
on their islands. The fund should be used to target island areas only, by
providing immediate help to those who are struggling most, either through
existing schemes and/or other new support where need is greatest. 
1.5  Given the critical nature of the fund it is important that the funding reaches
communities as quickly as possible. In regard to this members may be
minded to support the same initiatives as were agreed last year focusing on
Love Local cards, free school meal top ups and grants to 4 island foodbanks
as detailed in Table 1.  It should however be noted that this year there is
£56,000 less available to distribute and therefore there will need to be
reduction made in one or more of the 3 areas of support or a change in the
focus. In addition, the formal letter of offer has still be received and details
checked in regard to any specific requirements.  
Page 205 Agenda Item 10

Page 206

2.0 RECOMMENDATIONS 
It is recommended that the Policy and Resources Committee:- 
a.   Note the funding announced by the Scottish Government as part of its
Emergency Budget Review for 2023/24 financial year for Local
Authorities with responsibility for islands; and 
b.   Agree that arrangements for the fund be based on funding to support
similar initiatives to those agreed for 2022/23 and detailed in Table 1 but
that the specific details and funding split be delegated to the Executive
Director with responsibility for Development and Economic Growth in
consultation with the Leader, Depute Leader, Leader of the largest
Opposition Group and the Policy Lead for Islands to ensure that the
support reaches communities as quickly as possible.   
3.0  DETAIL 
3.1 The Scottish Government has announced that there will be an allocation of £1
million Island Cost of Crisis Emergency funding for 23/24 and this will be
distributed across the six Local Authorities with responsibility for islands. 
3.2  The funding is for the 2023/24 financial year only. The fund of £141,000 to Argyll
and Bute will be paid as a redetermination of the General Revenue Grant
during the last 2 weeks in March 2024. The formal letter of grant has still be
received. 
3.3  As members will recall the Scottish Government first provided Island Cost of
Crisis Emergency funding in 2022/23. The allocation for Argyll and Bute in
22/23 was £197,000. Policy and Resources Committee in December 2022
agreed to delegate the arrangements for Argyll and Bute’s allocation of the
22/23 funding to the Executive Director with responsibility for Development
and Economic Growth in consultation with the Leader, Depute Leader, Leader
of the largest Opposition Group and the Policy Lead for Islands the allocation
was agreed as detailed in the table below:-   
Table 1 ICCEF 2022/23 Distribution 
Argyll and Bute Council Love Local
Giftcards 
£149,280
Argyll and Bute Council Love Local
Giftcards Fee
£5,832.85
Food Bank Grants  £27,550.75
Free School Meal Top Ups £14,336.40
TOTAL IECCF 22/23 £197,000
Page 206

Page 207

3.4 Members may wish to support the same initiatives as last year however as there
is a reduction in the funding allocation for 2023/24 of £56,000 changes will need
to be made in regard to each specific allocation or a change to the focus. In this
regard a delegation is sought that would allow sufficient time to determine what
is possible with the funding available and the details of the allocation as well as
allow receipt of the formal letter of offer and check any additional requirements. 
4.0 CONCLUSION 
4.1 The £1 million Islands Cost Crisis Emergency allocation will support those on
islands facing even more significant cost of living challenges.  Estimates indicate
that Islands are facing around 20% to 66% higher costs of living than the UK
average.  High fuel costs, a colder climate and the lack of consumer choice is
also intensifying the impact of the cost crisis.  Argyll and Bute Council’s share of
the fund is £141k based on our island population.  The delegation
recommended will ensure that the Council can distribute this funding as quickly
as possible, once Argyll and Bute’s allocation has been formally confirmed by
letter with all relevant criteria provided by the Scottish Government.   
5.0 IMPLICATIONS 
5.1  Policy – The Scottish Government’s £1 million Islands Cost Crisis Emergency
allocation will support those on islands facing even more significant cost of living
challenges. 
5.2  Financial – Argyll and Bute’s allocation of the £1 million fund will be £141,000. 
5.3  Legal – None.
5.4  HR – None. 
5.5  Fairer Scotland Duty: 
5.5.1 Equalities – None 
5.5.2  Socio-Economic Duty – None 
5.5.3  Islands – The Islands Cost Crisis funding announced by the Scottish
Government will help support our island communities who are facing a higher
cost of living than the UK average.  
5.6  Climate Change – If the option to continue using Love Local cards is taken
spend will be restricted to premises within Argyll and Bute.  
5.7  Risk – None. 
5.8  Customer Service – This funding will ensure the Council are supporting our
island communities and households across Argyll and Bute. 
Executive Director with responsibility for Development and Economic Growth: 
Kirsty Flanagan 
Policy Lead for Islands and Business Development: Councillor Liz McCabe 
Page 207

Page 208

For further information contact: 
Fergus Murray, Head of Development and Economic Growth
Fergus.Murray@argyll-bute.gov.uk 
August 2023  
Page 208

Page 209

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND ECONOMIC 
GROWTH 
10 AUGUST 2023 
CHANGE TO ARGYLL COMMUNITY HOUSING ASSOCIATION GOVERNANCE
STRUCTURE 
1.0 INTRODUCTION 
1.1 The Council’s housing stock was transferred to Argyll Community Housing
Association (ACHA) in 2006. The Stock Transfer agreement between the Council
and ACHA requires that ACHA obtains prior written consent of the Council before
any reduction in the Council’s involvement in the Board of Management or Area
Committees is made.   
2.0 RECOMMENDATIONS 
2.1 It is recommended that Policy and Resources Committee notes the changes to
the governance structure as set out within the report. 
3.0 DETAIL  
3.1 The Council has been advised by ACHA that they have undertaken a review of
their Governance Rules.  In terms of the Stock Transfer Agreement, ACHA has
an obligation to consult with the Council when any changes are proposed to the
Governance structures.  The amended Rules will bring ACHA in line with other
similar organisations and will ensure that they meet the SFHA Charitable Model
Rules (Scotland) 2020. 
3.2 The ACHA Board of Management at the meeting on 17th November 2022 agreed
to remove the four Area Committees from the Association’s governance structure.
The decision was taken following a review of the Association’s governance
structure and against a background of the Area Committees not having met since
they were placed on hold at the start of the pandemic in March 2020. The Council
Area Committee members were subsequently made aware of the decision. 
Details on the consultation process are also provided in the report which was
considered by the ACHA Board.  A copy of the report is provided at Appendix 1.   
3.3 ACHA has now provided the Council with a copy of their proposed Draft Rules for
comment and have advised that they intend to put these rules to a Special
meeting of the Board in September 2023.  The main change to the Rules is the
removal of the 4 ACHA Area Committees, however there is still provision within
Page 209 Agenda Item 11

Page 210

the rules for these to be re-established if required. 
3.4  Officers have reviewed the draft Rules and are content that the Council will still be
represented on the Board by the 2 Elected Member appointees. 
4.0 CONCLUSION 
4.1 ACHA are required to consult with the Council in terms of any change to their
Governance Structures, therefore the Committee is asked to note the updated
Rules as outlined at Appendix 2. 
5.0 IMPLICATIONS  
5.1 Policy: None. 
5.2 Financial: None. 
5.3 Legal:   None. 
5.4 HR: None. 
5.5 
5.5.1         
5.5.2   
5.5.3    
Equalities(Fairer Scotland
Duty): 
Equalities – protected
characteristics: 
Socio-economic Duty: 
Islands:                                                 
None. 
None. 
None. 
None. 
5.6 Risk:  None. 
5.7  Climate Change:  None.   
5.8 Customer Service: None. 
Kirsty Flanagan
Executive Director with Responsibility for Development and Economic Growth 
Councillor Robin Currie, Policy Lead for Strategic Development 
June 2023 
Page 210

Page 211

For further information contact: 
Fergus Murray
Head of Development and Economic Growth   
Fergus.Murray@argyll-bute.gov.uk / 01546 604293 
Douglas Whyte
Team Lead – Housing Strategy
Douglas.Whyte@argyll-bute.gov.uk / 01546 604785 
APPENDICES 
Appendix 1 – Management Board Meeting – 17th November 2022 
Appendix 2 – Rules   
Page 211

Page 212

Appendix 1 
Argyll Community Housing Association 
Management Board Meeting 
Report presented by Colette Benham 
Non-Confidential 
TITLE:  ACHA Review of Area Committees 
PURPOSE OF REPORT: for consideration and approval 
RECOMMENDATIONS: 
The Board of Management is asked to agree: - 
1. That the four ACHA Area Committees should be removed as part of ACHA’s
governance structure; 
2. That local membership on the Board of Management is retained from all areas
previously covered by the Area Committees, to ensure all areas are
represented on the Board of Management; 
3. That going forward, tenant participation is a key area of focus for ACHA as
part of the transformation review being carried out; 
4. That a review of the Rules, Scheme of Delegated Authority, Code of Conduct
and relevant policies is carried out as part of a wider review of ACHA’s
governance arrangements in terms of the dissolution of Area Committees and
a future report is brought back to the Board of Management in this regard. 
Name of officer preparing report: Careen Hendry
Job Title:     Governance and Compliance Manager 
Telephone No:    01546 605970 
Item 
Date:  17 November 2022
Page 212

Page 213

REPORT: 
1. BACKGROUND 
1.1. At the Board of Management meeting on 19 August 2021, the Board were
advised that the Association intended to carry out a review of the role of Area
Committees due to them being placed on hold since the start of the pandemic
in March 2020. In February 2021, the Scottish Housing Regulator had
indicated that it would be good practice to review the role and remit of the
Area Committees to determine if they add value to the organisation. At the
Strategic Planning event in February 2022, the Board of Management
reviewed the position and agreed that review should take place by 31
October 2022. 
1.2. A sub-committee group was set up to carry out the review and to make
recommendations to the Board of Management. The sub-group comprised of
the three Area Committee Chairs from Mid Argyll and Kintyre (MAK), Cowal &
Bute and Oban, Lorn and the Isles (OLI) Area Committees, with a
representative from the Lomond and Helensburgh Area Committee, Bobby
Beggs, joining the group, given that the Lomond and Helensburgh Area
Committee does not currently have a Chair. The group was assisted from an
external perspective by Trudi Tokarczyk, Service Improvement Manager,
Scotland’s Housing Network. Yvonne Angus, Regional Manager, HNS, Karen
Hickey, PA to the Chief Executive and Careen Hendry, Governance Manager
also formed part of the review group. 
1.3. The review group met on 4 occasions between August and October 2022 and
considered the following questions: - 
1. Do the area committees add value to the organisation? Are there issues
covered by the area committees that are not considered elsewhere? In
the absence of area committees, would the organisation be exposed to
governance risk?
2. Are area committees actively involved in making decisions that couldn’t
be considered elsewhere? Specifically, what decisions are solely within
the remit of the area committees and what role do the area committees
have in terms of scrutiny and assurance? Is the scrutiny/ assurance
function carried out elsewhere, and if not, could this role be carried out
elsewhere in the governance structure?
3. How does the organisation ensure effective local engagement and
scrutiny with tenants?
4. Given that area committees were originally set up to improve tenant
participation, is our performance in terms of tenant participation better
than those organisations who do not have an area committee function in
place? 
5. Are the area committees likely to be able to operate effectively in the post-
pandemic environment? Are there likely to be issues attracting area
committee members if the current structure was maintained? Are there
likely to be issues in terms of member participation in light of the
Page 213

Page 214

introduction of the Board Portal and the fact that more meetings are held
virtually?
6. What are the resource implications in terms of supporting the area
committees? Could this be supported through any other means? 
2. THE REVIEW 
2.1  Governance Structures
The review looked at the 12 peer group organisations that ACHA used for
performance benchmarking (Appendix 1) and found that, in respect of the
group, ACHA was the only organisation which retained area committees as
part of their governance structure. All other associations have a Board of
Management made up of members with relevant skills, knowledge and
experience, including tenant members. Six associations have sub-committees
in place which are similar to our own governance structure and consider
specific areas of the business, such as audit and policy. Like ACHA, the
associations examined engaged with tenants via tenant scrutiny groups,
registered tenant organisations and tenant feedback forums. 
2.2 In terms of the national picture, Trudi Tokarczyk confirmed that the large
majority of RSLs no longer have area committees as part of their formal
governance structure, aside from 2 very large organisations and that tenant
scrutiny groups were seen as best practice in terms of participation and
engagement. It was noted that one organisation had local housing committees
in place but that these were not part of the organisation’s governance
structure and that they had a similar remit to ACHA’s Your Voice group. Board
members will note that, while the association’s peer group has recently been
amended from the 12 organisations whose governance structures were
reviewed to a new peer group of 9, this does not change the position that it is
unusual for RSLs to retain area committees as part of their governance
structures, therefore a review of the new peer group was not considered
necessary.   
2.3 Consultation
The review group carried out a consultation with existing Area Committee
members and a summary of responses is attached (Appendix 2). Members
were asked for their views on retaining Area Committees, their reasons for
this, whether they would continue to be a member if the area committees
reconvened, what support they would need to participate in meetings, whether
they were interested in joining the Board of Management or, if they were an
ACHA tenant, a tenant participation group. Members were also asked if they
had any further comments to make. Of the 24 surveys that were sent out, 9
responses were received which was a response rate of 37.5%. Six of the
respondents were in favour of retaining area committees and would remain
members if the area committees were reconvened. These comprised of 2
tenant members (from Bute & Cowal and Lomond), 1 independent member
(MAK), 2 councillors and a member who remained anonymous. Some
members felt that area committees remained relevant and should be retained
Page 214

Page 215

while others felt they had served their purpose and were no longer useful. It
was noted that some Area Committees, for example, Lomond and
Helensburgh, had historically been stronger in terms of interest than others
and that in the past some committees, for example OLI, had struggled to
recruit new members, however, based on the responses to the consultation,
none of the area committees would have sufficient members to be quorate at
the current time. 
2.4  Tenant Participation
It was clear from the start that tenant participation is a key issue for all RSLs
and, while a review of tenant participation was not within the remit of the
review group, it was considered helpful for the group to consider how other
organisations have improved participation. Max Scotto, Tenant Participation
Officer, Kingdom Housing Association, attended a meeting and gave a
presentation on the variety of methods used by them to increase participation
which the group found very helpful. The group also considered ACHA’s tenant
participation groups which are as follows: - 
o The Feedb@ck forum - comprising tenants who have indicated
that they would like to take part in surveys or consultation about
our services and policies.
o Registered Tenant Organisations (RTO’s) - ACHA supports a
number of groups who have formally set themselves up as an
RTO or as more commonly known, a Tenant & Resident
Association. ACHA can provide funding to groups and will help
organisers set up new groups in local areas. We currently have
two RTOs – one in Cardross and one in Campbeltown. 
o Your Voice (Tenant Scrutiny Group) - Our newest participation
forum which tests our policies and procedures to make sure they
are fit for purpose. The Your Voice group make formal
recommendations to the Board of Management.     
2.5 Next Steps Programme
The group also considered ACHA’s participation in the Next Steps programme
which was aimed at housing organisations to help landlords and their tenants
review, improve and develop their current tenant participation and scrutiny
arrangements. The programme was delivered to ACHA by the Tenant
Information Service (TIS) based on a series of workshops for tenants, staff
and governing body members. It was designed to build on current good
practice and to support us to meet our legislative obligation on tenant
participation and to improve our performance against the Scottish Social
Housing Charter outcomes and standards. The group heard that, in 2019, TIS
carried out a desktop assessment on all of ACHA’s current activities and a
series of participation workshops were held, facilitated by TIS, for staff and
councillors/governing body members and our tenants. An action plan was
developed and while some actions were progressed, due to the pandemic and
resource issues this has not been taken forward in any great detail.
Page 215

Page 216

2.6 Recommendations
The group were in favour of dissolving area committees, noting that they are
no longer quorate having not met since March 2020 and that recruiting new
members would be challenging. This decision was not one that was taken
lightly and it was unanimously agreed that retaining local representation on
the Board of Management would be important going forward. The group also
felt that tenant participation should be a key area of focus going forward.
Returning to the questions posed at the beginning of the review, the group
considered each in turn. 
1. Do the area committees add value to the organisation? Are there issues
covered by the area committees that are not considered elsewhere? In
the absence of area committees, would the organisation be exposed to
governance risk? 
The group felt that the Board of Management has effectively fulfilled the
remit of Area Committees since the start of the pandemic without any
significant impact on the work of the Board, but that each of the areas that
the Area Committees represent need to continue to be represented on the
Board to ensure that all areas of Argyll and Bute are represented and that
feedback from tenant groups needs to be effectively conveyed to the
Board of Management in the absence of Area Committees. 
2. Are area committees actively involved in making decisions that couldn’t
be considered elsewhere? Specifically, what decisions are solely within
the remit of the area committees and what role do the area committees
have in terms of scrutiny and assurance? Is the scrutiny/ assurance
function carried out elsewhere, and if not, could this role be carried out
elsewhere in the governance structure? 
The group felt that local scrutiny could continue by having local
representation on the Board of Management and an effective feedback
mechanism from the tenant participation groups. 
3. How does the organisation ensure effective local engagement and
scrutiny with tenants? 
The group agreed that the tenant participation groups provide the most
effective method of local engagement and scrutiny. As noted above, there
are currently two RTOs in the area, plus the Your Voice group and the
Feedb@ck Forum. 
4. Given that area committees were originally set up to improve tenant
participation, is our performance in terms of tenant participation better
than those organisations who do not have an area committee function in
place? The 2021 Tenant Satisfaction survey showed that 83.8% of
tenants were satisfied with the overall service provided by ACHA
compared with a Scottish average of 88.8%. 81.3% of those who
responded were happy with opportunities to participate in decision making
compared with a Scottish average of 88.3%.  In terms of keeping tenants
informed 85.8% felt that we were good at keeping them informed about
our services and decisions and that this figure was a decrease from the
Page 216

Page 217

previous survey, and was below the Scottish average of 92.3%, therefore
having an area committee structure in place does not, in itself, lead to
increased tenant participation. 
5. Are the area committees likely to be able to operate effectively in the post-
pandemic environment? Are there likely to be issues attracting area
committee members if the current structure was maintained? Are there
likely to be issues in terms of member participation in light of the
introduction of the Board Portal and the fact that more meetings are held
virtually?
In terms of membership, Area Committees are not currently sufficiently
quorate to operate and a recruitment drive would be needed before
meetings could be held, therefore they are not currently viable due to lack
of members.  Three area committee members who responded to the
survey indicated that they would need direct support to participate in
meetings with the increased use of technology. 
6. What are the resource implications in terms of supporting the area
committees? Could this be supported through any other means?
The annual cost of supporting Area Committees prior to the pandemic
was approximately £11,000, around 75% of which was staff costs. These
costs could be reduced slightly if more meetings were held virtually.
ACHA currently supports the Registered Tenant Organisations (RTOs), in
Cardross and Dalintober with expenses such as printing and meeting
room hire. RTOs create their own constitution and ACHA only provide
support if requested.  In terms of the Your Voice group, ACHA provide a
budget, attend all meetings and pay for the Tenant Advisory Service (TIS)
to independently support the group. 
2.7  Further Actions  
If the Board of Management is in agreement with the recommendations,
the Rules and key governance documents, such as the Scheme of
Delegation, Code of Conduct and policies pertaining to the Area
Committees will require to be reviewed and the change of Rules will
require to be notified to Argyll & Bute Council, the Scottish Housing
Regulator, OSCR and the Financial Conduct Authority. Due to a change
in legislation, it is no longer necessary to obtain consent from the Council
and the Regulator to change the Rules, however, both would be notified
of the change. 
A summary of the process is noted below: - 
• Notify decision to remove area committees to Argyll and Bute
Council; 
• Review and amend draft rules and other documents;
• Board of Management to approve terms of new draft rules;
• Special General Meeting of the Board of Management is held at
which members approve the new rules;
Page 217

Page 218

• Signed rules and relevant FCA forms are sent to FCA for
registration of the new rules;   
• Notification made to SHR sending registered rules (together a
copy of the report and minute of the governing body agreeing to
adopt the rules) via the SHR portal;
• Notification made to OSCR with completed OSCR Notification
Form and a copy of registered rules. 
3. POLICY AND RESOURCE IMPLICATIONS: 
3.1. Resource Implications: 
Financial: 
 Potential saving, based on pre-pandemic costs, of up to £11,000 per
annum. 
Legal:  
• Complying with the notification requirements noted at paragraph 2.7
above will ensure that our legal obligations are met. 
Personnel: 
• There are no personnel implications from this report although staff time in
supporting and servicing area committees will be reduced. 
Procurement: 
• There are no procurement implications arising from this report. 
3.2. Equality and Socio-Economic Impacts: 
 We require to safeguard and promote of the interests of tenants and to
ensure that tenants and other customers find it easy to participate in and
influence their landlord's decisions at a level they feel comfortable with.
3.3. Privacy and Data Protection Impacts: 
• There are no privacy and data protection impacts from this report. 
3.4. Risk Assessment: 
Key Risk 2 – Providing quality customer care and equality across all of our
services; Key risk 4 -  Delivering progressive and sustainable business
performance and service delivery. 
Page 218

Page 219

5.  ATTACHMENTS 
 Appendix 2 -   Peer Groups Review of Governance Structures  
 Appendix 3 – Summary of Area Committee Consultation Responses 
Page 219

Page 220

Appendix 2 
Overview of Governance Structures within Peer Organisations* 
Association  Structure
Albyn
Housing
Group
Rural Governed by a Board of Management with 5 committees
sitting below, made up of Board and tenant members for the
following areas;
 Performance: responsible for reporting to and advising
the Board on business performance against agreed
targets, driving continuous improvement, and for
promoting efficiency and effectiveness.
 Staffing, Health, Safety and Environment: responsible for
advising the Board on the effective discharge of
employer responsibilities, ensuring compliance with
statutory requirements and for implementing terms and
conditions and employment practice, policies and
procedures
 Audit and Risk Management: responsible for
implementing and monitoring policy, reporting to and
advising the Board on financial management and
business performance, monitoring effectiveness of
internal controls, overseeing the conduct of the annual
financial statements audit and advising on the
appointment of external and internal auditors
 Transformation: the committee has strategic oversight of
the overall business transformation programme, and its
components.
 Remuneration: the committee’s primary aim is to
approve the appropriate remuneration and terms of
service for the Chief Executive, Senior Management,
and Board as determined by the Society Board.
https://www.albynhousing.org.uk/about-us-2019/board-and-
management/ 
The group also engage with tenant forums for customer
feedback and contribution. Some of the groups are
registered with Albyn but they are not part of the
governance structure and the Board does not delegate any
decision making to them.
https://www.albynhousing.org.uk/get-involved/ 
Page 220

Page 221

Berwickshire
Housing
Association
Ltd
LSVT  Governed by a Board of Directors, with 2 committees sitting
below, made up of Board members whose authority
includes:
 Audit and Finance:
o Receive management reporting and highlight key data
for Board 
o Monitor business plans for all entities to ensure that
changes to plans are evaluated from a financial
perspective
o Input to the long term planning for the Association,
including rent policy, asset management, development
aspirations, cash flow and funding, pension
arrangements and treasury management etc
o Consider and make treasury management decisions
for The Association under the delegated authority from
the Board
o Approve all financial and accounting policies
o Monitor business plans for all entities to ensure that
changes to plans are evaluated from a financial
perspective
o Oversee the financial reporting and disclosure process
o Monitor choice of accounting policies and principles
o Oversee the hire, monitor performance and
independence of the internal and external auditors
o Oversee regulatory compliance, ethics and whistle-
blower procedures
o Monitor the internal control process
o Oversee the performance of the audit function
o Monitor existing projects highlighting key risks and
changes to risk 
o Monitor the risk management framework of the
Association and its subsidiary
o Approve all of the internal control and fraud prevention
policies 
 Operations:
o Oversee the operational plans for asset management
including major refurbishment and cyclical repairs
o Monitor new developments and feed in views and
ideas about the specifications of the properties or the
estates
o Monitor the development of EESSH (Energy Efficiency
Standard in Social Housing) within the timescale
o Be consulted on key changes in any customer service
that will directly affect tenants
o Review the outcomes from the Group’s Health and
Safety Committees and monitor compliance with
relevant legislation
Page 221

Page 222

o Review the Key Performance Indicators for Customer
Services and ensure performance is actively managed
for improvements
o Review and approve contract awards 
The committees meet regularly throughout the year and
work on delegated authority from the Board. The
Committees are made up of Board members with interests
and skills relevant to the subject areas.
https://www.berwickshirehousing.org.uk/about-us/how-we-
are-governed/ 
Hebridean
Housing
Partnership                                                                 
LSVT Governed by a Board of Directors. The Board is supported
by two Committees:
• Audit & Risk Committee, ensures that:
o Effective internal controls operate to ensure the
Partnership complies with relevant laws, regulations
and external reporting requirements
o The system of controls, financial and otherwise,
promotes effective and efficient operations
o There is an independent review of internal and
external audit activity 
• Joint Consultative Committee, ensures that:
o Provides a workable and effective arrangement for
good industrial relations, for the promotion of joint
participation in all matters of common interest and
concern on a genuine consultative and negotiating
basis at Organisation level 
and also four Workgroups with remits as listed below:
• Asset Management;
o consider potential sites for acquisition;
o assess and review project and site plans;
o review HHP’s 5 Year Development Plan;
o represent the Partnership at openings of
developments; 
o consider in depth any issues that might arise whilst
developments are underway; 
o prepare responses for consultations relating to local
and national development issues; 
o consider any additional matters requested by the
Board in respect of the Partnership’s development
service; 
o contribute to and review the Asset Management
Strategy; 
o contribute to and review the Affordable Warmth
Strategy and matters pertaining to fuel poverty; 
o review updates to the Investment Programme prior to
Board approval being requested; 
Page 222

Page 223

o consider the Procurement Framework & procurement
matters pertaining to investment work prior to Board
approval being requested; 
o consider and review any major updates to the Repairs
& Maintenance Policy, Asbestos Policy, Estate
Management Policy and Gas Safety Management
Policy; 
o review the Grounds Maintenance & Garden Assistance
Scheme prior to Board approval being requested; 
o monitor progress against Scottish Housing Quality
Standard (SHQS) and the Energy Efficiency Standard
for Social Housing (EESSH); 
o consider any additional matters requested by the
Board in respect of investment in the Partnership’s
housing stock; 
o feed back to the Board in respect of achieving the best
asset management service for tenants and the
Partnership alike. 
• Finance;
o To review the Budget Strategy and rent setting
process, including consultation with tenants; 
o To review Draft Financial Statements; • To stress test
the long term and short term financial plans which
support the Business Plan; 
o To contribute to and review the Value for Money
Strategy (VFM); 
o To consider any additional matters requested by the
Board in respect of finance; and 
o To give views based on achieving the best financial
services for tenants in accordance with the
requirements of the Partnership 
• Remuneration; 
o To recommend to the Board how the Annual Pay
Award will be carried out; 
o To consider recommendations from the Chief
Executive for the Annual Pay Review for all staff with
the exception of the Chief Executive; 
o To recommend to the Board an Annual Pay Award for
the Chief Executive on condition the % awarded does
not exceed the % offered to the staff; 
o To review on a regular basis the grading and salary
framework to enable a robust review of the grading of
all approved posts; 
o To manage the grading appeals mechanism to deal
with grading appeals; and 
o To review when consultancy support is required and to
select appropriate consultants within approved
budgets.
Page 223

Page 224

• Housing Management
o To review legislation in relation to housing
management and implement the requirements and
recommendations of, for example, the Housing
Scotland Act 2014; 
o To oversee the review of the Allocations Policy, to
include any consultation required; 
o To investigate and consider how the Partnership might
address difficult to let properties; 
o To liaise with the Tenant Participation Officer where
required; 
o To consider rent structure along with the Finance
Working Group; 
o To consider any additional matters requested by the
Board in respect the management of the Partnership’s
housing service; and 
o To give views based on achieving the best housing
management service for tenants and the Partnership
alike.
 Working groups are made up of Board members plus the
Chief Executive and Senior Officers 
The association engage with tenants on key decisions
through membership of tenants on the Board and also
working closely with the Western Isles Housing Associations
Communities Forum and the Tenant Participation Advisory
Service (Scotland).
http://www.hebrideanhousing.co.uk/about/ 
River Clyde
Homes Ltd                                                                                 
LSVT Governed by a Board of Directors with 3 sub committees
for:
 Audit and Risk, 
established to consider the work and outputs of the
external and internal audit functions and the overall risk
environment of the RCH Group of companies. The
Committee oversees auditing responsibilities, financial
management and ensures effective risk monitoring and
management. It provides the RCH and HFS Boards with
assurance that there is a systematic review of internal
controls and financial reporting and that key risks are
being identified and managed. 
 Remuneration and Nominations
The Committee has been established to advise the RCH
Board and HFS Board on the succession, recruitment,
induction and training of Board and Committee Members
and to manage the Boards’ recruitment process. The
Committee also acts as a staffing committee with
delegated authority to consider appeals and grievances
Page 224

Page 225

and take appropriate action. 
 Social Landlord Operations.
established to agree any customer facing strategy and
policy. The Committee oversees performance and
service standards for customers and provides assurance
to the RCH Board of legislative and regulatory
compliance in respect of housing, property and tenancy
matters. 
Sub committees are made up of Board members and have
delegated authority for some decisions. 
The group engages with tenants via a Customer Senate,
who’s role is to scrutinise performance of the Group. The
group also consult with Registered Tenants and Residents
Associations
https://www.riverclydehomes.org.uk/page/about-us 
Scottish
Borders
Housing
Association                                                      
LSVT Governed by a Board of Management. There are two main
Sub-Committees for:
 Audit & Compliance Sub Committee who provide
detailed assurance on compliance and risk,
 The Customer Board who review customer experience,
service development and policy. 
A Chair’s Group is available for urgent decisions and the
Remuneration and Nominations Sub Committee meets a
minimum of once a year. Office bearer posts of the Chair of
the Board and Convenor of the Audit & Compliance Sub-
Committee are remunerated. 
The group engages with tenants via the Scottish Borders
Tenants Organisation (SBTO) and as 3 Registered Tenant
Organisations. Tenants can also become a representative
on Planned Maintenance Schemes in their own area
https://www.sbha.org.uk/about-sbha/whos-who/sbha-board-
of-management/ 
Lochaber Rural Governed by a Board of Management.
The Board also has three sub committees who meet
quarterly: 
 Audit Sub 
 Governance 
 Health and Safety 
Sub committees are made up of Board Members. 
The association consults with tenants via their own tenant
forum ‘Your Voice’.  The group are consulted about policies
Page 225

Page 226

and procedures.
https://lochaberhousing.org.uk/your-lha/get-involved/join-
board-management/ 
Dumfries
and
Galloway
Housing
Partnership 
LSVT Part of the Wheatley Group. DHHP is governed by a Board
of Directors.  There are no sub committees.
The association consults with tenants via Registered Tenant
Organisations (RTOs). They also engage with a scrutiny
panel made up of customers from across the Wheatley
Group which looks at performance across DGHP and the
Wheatley Group.
https://www.dghp.org.uk/about-us/governance 
West
Highland
Housing
Association                                
Rural Governed by a Board of Management. There are no sub
committees. 
The group engages with tenants via a Tenant Scrutiny
Panel; an independent tenant led group which monitors
performance in service provision and governance. Tenants
can also take part in focus groups to contribute to the
development of policies or scrutinise specific service issues. 
Dunbritton
Housing
Association                                       
Rural Governed by a Board of Management, there are no sub
committees.   
The group engage with tenants via a Tenant Scrutiny Panel
whose purpose is to look at how the Association works and
advise on ways to improve service delivery and provide
value for money for tenants.
https://www.dunbritton.org.uk/our-board-/ 
Fyne Homes                                                                          Rural Governed by a Management Committee, there are no sub
committees.
https://fynehomes.org.uk/get-involved/management-
committee/ 
The group engages with tenants via a Scrutiny panel to look
at areas of performance and carries out consultations 
Lochalsh
and Skye
Rural Governed by a Board of Management, there are no sub
committees. 
https://www.lsha.co.uk/join 
The association engages with tenants via the Tenants Voice
Group, who are not part of the governing structure but are
involved in the development of policy and procedure. The
group also consult with tenants using a variety of
consultations. 
Page 226

Page 227

* Peer Group amended October 2022 to the following: - 
1. ACHA
2. Albyn HA
3. Kingdom HA
4. Grampian HA
5. Trust HA
6.  Scottish Borders HA
7.  Caledonia HA
8.  Hebridean Housing Partnership
9.  Eildon HA 
Page 227

Page 228

Appendix 3 
Summary of Area Committee Member Consultation Responses
24 surveys sent out: 9 responses (37.5%) 
4 tenant members, 3 independent members, 2 Councillors 
2 respondents from Bute & Cowal; 2 MAK; 3 Lomond; 1 OLI; 1 anonymous (
?tenant)   
In favour of retaining Area Committees: 6 
comprising 1 independent member (MAK), 1 independent (Lomond), 2 Councillors,
2 tenant members (Lomond and Bute & Cowal) 
In favour of not retaining ACs: 2 
1 independent (Bute & Cowal), 1 tenant (MAK) 
Unclear/ Not answered: 1 
Number who would remain AC members: 6   
2 councillors; 1 anonymous (? tenant); 2 tenants; 1 independent 
Number in favour of retaining who are ACHA tenants: 2, possibly 3 
Need support to participate online: 3 
Number of tenants who would consider joining Board: 1 
Number of tenants who would consider joining a tenant participation group: 3 
Additional Comments: 
I am a member of the Cowal & Bute Area Committee and have been a committee
member off and on for the past 15 years. I am not a tenant. I'm afraid I feel the ACs
are becoming less relevant as time passes and the interest from tenants is minimal.
(Independent member, Bute & Cowal)
The AC gives local tenant reps a say in their local community. Review should
consider distance and persuading tenant members to take part. New tenant
members need to be encouraged. (Independent member, MAK)
ACs were good and very representative of tenant’s views and kept both tenants and
residents informed of what was happening their local area. (Councillor, Lomond)
I understand if decision is made to get rid of committees. At one time they were quite
useful but latterly felt we weren’t given enough to decide on. (Tenant member, MAK)
You really do need area committees. You cover far too much an area to not have
them. The issues that affect Campbeltown are very different from those affecting
Helensburgh or Dunoon. Areas have different problems and therefore different
solutions. (Independent member, Lomond)
Page 228

Page 229

Let’s see what they come up with (anonymous)
How to achieve greater tenant participation is the main issue I feel that needs to be
considered. The area committee’s meet during the working day, which is fine for the
ACHA staff attending, but precludes the vast majority of working tenants. This means
that those that do attend the area committee meetings are drawn mainly from the
retired population – who may indeed do sterling work but are not representative of
the vast majority of tenants. (Tenant member, Bute & Cowal) 
Page 229

Page 230

This page is intentionally left blank

Page 231

Policy and Resources Committee Work Plan 2023-2024
This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. 
Date Report Title Dept/Section How Often? Date Due Comments 
12 August 2023 Financial Report Monitoring Pack  Financial Services Every meeting
except May
11 July 2023 
Budget Outlook  Financial Services   
Levelling Up Fund Development and
Economic Growth   
Place Based Investment Update  Development and
Economic Growth   
Rothesay Pavilion - Rural Growth
Deal 
Development and
Economic Growth 
Rothesay Pavilion (RPN) – Project
Position Update 
Commercial
Services   
Capital Investment Strategy Commercial
Services   
Change to Argyll Community
Housing Association Governance
Structure
Development and
Economic Growth   
Community Empowerment
(Scotland) Act 2015 – Update on
Expressions of Interest / Asset
Transfer Requests 
Commercial
Services   
Islands Cost Crisis Emergency Fund
2023/24 
Development and
Economic Growth   
Page 231
Agenda Item
12

Page 232

Policy and Resources Committee Work Plan 2023-2024
Date Report Title Dept/Section How Often? Date Due Comments 
12 October 2023 Financial Report Monitoring Pack  Financial Services Every meeting
except May
12 September 2023 
7. Budget Outlook
8. 
Financial Services   
9. Policy For Empty Property Relief In
Non-Domestic Rates From 1 April
2024 
Financial Services   Agreed 13.10.22 that an update
would be provided in October
2023 
10. Proposed Allocation of Crown
Estates Funding 2023/24
Development and
Economic Growth   
11. Placed Based Investment 2023-24
Update 
Development and
Economic Growth   
Rothesay Pavilion Update Development and
Economic Growth   
Date Report Title Dept/Section How Often? Date Due Comments 
7 December
2023
Financial Report Monitoring Pack  Financial Services  7 November 2023 
12. Budget Outlook
13. 
Financial Services   
14. Annual Review of Procurement
Strategy and Sustainable
Procurement Policy
15. 
Legal and
Regulatory Support   
Date Report Title Dept/Section How Often? Date Due Comments 
15 February
2024
Financial Report Monitoring Pack  Financial Services Every meeting
except May
16 January 2024 
Budget 2024-2025 Financial Services 
Page 232

Page 233

Policy and Resources Committee Work Plan 2023-2024 
Treasury Management Strategy Financial Services 
16. Strategic Events and Festivals Development and
Economic Growth   
Date Report Title Dept/Section How Often? Date Due Comments 
9 May 2024  Budget Outlook Financial Services   9 April 2024 
Budget Approach 2024/25 Financial Services 
Future Items – Date to be determined. 
Key Performance Indicators FQ2 –
2022/2023 – changing to Corporate
Outcome Indicators 
Customer Support
Services
Annual   
Historic Environment Scotland
Heritage and Place Programme –
Opportunity for Place Based
Heritage Funding
Development and
Economic Growth   
UK Shared Prosperity Fund – Argyll
and Bute Investment Plan
Development and
Economic Growth  
Regular updates to be provided. 
Agreed 11.08.2022
Page 233

Page 234

This page is intentionally left blank

Page 235

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
10 AUGUST 2023
RURAL GROWTH DEAL – ROTHESAY PAVILION 
1.0 EXECUTIVE SUMMARY
1.1 The main purpose of this report is to provide an update on the Rural Growth
Deal (RGD) and in particular an update on the “Tourism – Creating a World
Class Visitor Destination” theme.
1.2 The report provides members with an update on decisions taken by the Rural
Growth Deal Programme Board on what projects to take forward within the
Tourism Theme. The Programme Board have made the decision to include the
completion of Rothesay Pavilion as a priority project and have allocated circa
£9m to the project, subject to approval by UK and Scottish Government.
1.3 The completion of Rothesay Pavilion is a Council Priority and offers the Rural
Growth Deal an opportunity to support an economically transformational project.
Rothesay Pavilion has the scale, quality, architectural significance and ambition
as a new cultural and creative industries hub to deliver as part of the wider RGD
tourism theme. In particular, the Pavilion has the potential to be a nationally
significant visitor attraction to the area whilst at the same time aligning to the
Scottish and UK Government’s economic and social priorities including the
emergence of the wellbeing and circular economy, skills for work with a focus on
creative, hospitality and digital skills together with the need to deliver net zero.
1.4 The allocation of £9m to the Rothesay Pavilion Project significantly reduces the
funding gap for the next 2 phases of works. The Rothesay Pavilion Lobbying
Group continue to work on identifying sources of additional funding to bridge the
remaining gap. Additional financial details regarding the project are contained
within the report that accompanies this report. 
RECOMMENDATIONS: 
The Policy and Resources Committee are asked to:-  
i. Endorse the decision of the Rural Growth Deal Programme Board to
allocate £9m of Rural Growth Deal Funding to Rothesay Pavilion under
the “Tourism – Creating a World Class Visitor Destination” theme. 
ii. Note that all funding brought through the Rural Growth Deal is subject to
approval of Treasury 5 business cases by the UK and Scottish
Government. 
Page 235 Agenda Item 13a

Page 236

iii. Note a further update will be brought to the Policy and Resources
Committee following approval of the Rural Growth Deal Full Business
Case by the UK and Scottish Government. 
Page 236

Page 237

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
10 AUGUST 2023
RURAL GROWTH DEAL – ROTHESAY PAVILION 
2.0 INTRODUCTION
2.1 This report provides an update on the Rural Growth Deal (RGD) and in
particular an update on the “Tourism – Creating a World Class Visitor
Destination” theme. 
2.2 The Council, UK and Scottish Governments agreed the ‘Heads of Terms’ for
the RGD on the 11th February 2021. The Heads of Terms Agreement sets out
the general areas for investment and the Full Deal Agreement will build upon
this in more detail.  In order to reach Full Deal, each project within the Deal
has to have a Treasury 5 Outline Business Case approved by UK and
Scottish Government. The Rural Growth Deal Programme Management
Office (RGD PMO), Project Leads and Stantec UK Ltd are currently
progressing OBCs for each Project, with a number now having been
submitted for first stage feedback.   
2.3 A key aim of the Rural Growth Deal is to deliver economically transformational
projects. Projects in the “Tourism” theme of the RGD seek to encourage the
growth of tourism and develop Argyll as a West of Scotland “must visit”
location while supporting the regeneration of our key coastal towns and
villages. 
2.4 The Rural Growth Deal Programme Board have approved a proposal to
allocate circa £9m of RGD Government funding to the Rothesay Pavilion
project, subject to further discussion and Full Business Case approval by the
UK and Scottish Governments. Once approved, this funding will support the
regeneration of this nationally recognised building, whilst at the same time
creating opportunities for regeneration, cultural enhancement and the creation
of important high value jobs within the context of Rothesay and the island of
Bute. 
3.0 RECOMMENDATIONS
The Policy and Resources Committee are asked to:-  
i. Endorse the decision of the Rural Growth Deal Programme Board
to allocate £9m of Rural Growth Deal Funding to Rothesay
Pavilion under the “Tourism – Creating a World Class Visitor
Destination” theme. 
Page 237

Page 238

ii. Note that all funding brought through the Rural Growth Deal is subject to
approval of Treasury 5 business cases by the UK and Scottish
Government. 
iii. Note a further update will be brought to the Policy and Resources
Committee following approval of the Rural Growth Deal Full Business
Case by the UK and Scottish Government. 
4.0 DETAIL
4.1 The Council agreed the ‘Heads of Terms’ for the RGD on the 11th February
2021 and are currently working towards signing the Full Deal Agreement. 
4.2 In order to sign the Full Deal Agreement the Council must submit Treasury 5
Business Cases to UK and Scottish Government for approval. In order to
develop a strong business case, projects should be of a scale that they are
economically transformational and can show positive Benefit Cost Ratios. The
Government appraisal process is rigorous, and several iterations of business
cases required to be submitted before being approved. 
Tourism – Creating A World Class Visitor Destination - Rothesay
Pavilion
4.3   The Rural Growth Deal Programme Board met on 10th May 2023 and
considered an update on the “Tourism – Creating a World Class Visitor
Destination” theme of the RGD. The Programme Board were asked to consider
a proposal to re-profile funding within the Tourism Programme to focus on the
completion of the Rothesay Pavilion project. This would provide a budget of
circa £9m via the Rural Growth Deal, which would significantly reduce the
funding gap which stands at circa £13m. 
4.4 As reported to the Policy & Resources Committee in December 2022, a number
of priority locations had been identified for consideration for funding under the
Tourism Theme of the RGD:- 
  Dunoon Waterfront
 Rothesay Waterfront
 Helensburgh (Wooden Pier)
 Ardrishaig/Crinan Canal Corridor
 Campbeltown – Kintyre Sea Sports 
4.5 Over the past 6 months, Council Officers, Stantec, partner organisations and
local stakeholders have been working to develop project options for each
identified location, however it has been very challenging to identify
transformational projects achievable with the budget available in each location.
This is a particular risk, given that some of these projects would not have been
delivered until the later stages of the RGD Programme and will therefore be
subject to cost inflation pressures. It was also considered that there was a risk
that these smaller scale projects would not have sufficient benefit cost ratios and
would not create a favourable Treasury 5 Business Case, as is required by
Page 238

Page 239

Government and as advised by Stantec our consultants working on the
business cases. It was proposed that alternative funding streams could support
some of the RGD project options that were considered and Development &
Economic Growth Officers will continue to work with local and national
stakeholders to ensure that alternative funding streams are identified and
progressed.
4.6 It was therefore considered that an alternative option could be to scope back the
number of locations targeted via the RGD and focus the Tourism investment on
a larger scale, transformational project such as Rothesay Pavilion. 
4.7 It was proposed that the second project within the Tourism Theme, Kintyre
Seasports, remain within the programme as it is significantly advanced and the
Outline Business Case has been submitted to Government for first stage
appraisal.
4.8 The Rural Growth Deal Programme Board subsequently approved this proposal,
subject to further discussions with the UK and Scottish Governments. 
4.9 The RGD PMO have held subsequent discussions with UK and Scottish
Government Civil Servants. In line with the process for Rural Growth Deal
projects, Government will require a Treasury 5 Full Business Case to approve
the proposal in full. Civil Servants have indicated that they may be able to
provide an earlier “approval in principle” in order that Argyll and Bute Council
can consider instructing phases 2b and 2c of the Pavilion Project. The RGD
PMO, along with the Rothesay Pavilion Project Management Team are currently
working to provide Government with the information that they require in order to
make an “approval in principle” decision. 
4.10 The RGD PMO have instructed Stantec UK Ltd to prepare a Full Business Case
for Rothesay Pavilion and it is hoped that this will be submitted to Government
for appraisal in late August/early September 2023. It is expected that several
iterations of the FBC will be required and it is hoped that the FBC will be
approved by the end of 2023. 
4.11 Argyll and Bute Council cannot drawdown funding from the Rural Growth Deal
until “Full Deal” is signed. It is currently forecast that “Full Deal” will be signed
early in 2024.  It is therefore anticipated that the Council may have to underwrite
some spend on the Pavilion until such time as RGD Funding is available for
drawdown.
4.12 Despite the contribution of £9m from the RGD, it is noted that a funding gap of
circa £4m remains. The Rothesay Pavilion Lobbying Group continue to work
with potential funders to identify sources of funding to address the remaining
funding gap. 
Page 239

Page 240

5.0 CONCLUSION
5.1 The Rural Growth Deal offers an opportunity to support the completion of
Rothesay Pavilion by contributing circa £9m.  The Pavilion project is consistent
with the aims of the “Tourism – Creating a World Class Visitor Destination”
theme of the Rural Growth Deal and offers an opportunity for the RGD to
support an economically transformational project of scale that will benefit the
community of the Isle of Bute and beyond. 
5.2 There remains a funding shortfall however the Rothesay Pavilion Lobbying
Group are actively seeking funding to address this through a Lobbying Strategy.
The quicker we can deliver the Pavilion project however means the more likely
the funding gap will be reduced.
5.3 The inclusion of Rothesay Pavilion will require to be approved by UK and
Scottish Government. A Full Business Case is being developed at pace in order
that approval can be provided as early as possible to progress the completion
Rothesay Pavilion. 
6.0 IMPLICATIONS
6.1 Policy – The RGD is consistent with the Council’s Economic Strategy.
6.2 Financial – There may be a requirement for Finance to underwrite spending
until the Full Deal Agreement is signed and RGD Funding is available for
drawdown. There remains a budget gap.  
6.3  Legal – none identified at present.
6.4  HR – None at present.
6.5  Fairer Scotland Duty: Required as part of the Business Case Process.
6.5.1   Equalities - protected characteristics – an EqSEIA will be
completed as part of the Business Case process.
6.5.2   Socio-economic Duty – The Rural Growth Deal will follow
Scottish Government guidance on Inclusive growth including
measures to address socio-economic disadvantage.
6.5.3   Islands – Islands impact assessments required as part of OBC
process where necessary.
6.6  Climate Change – all RGD Projects must follow Scottish Government Carbon
Management Guidance. 
6.7 Risk – risk that Full Deal signing could be delayed and release of funding could
be delayed. 
6.8 Customer Service – None at present. 
Kirsty Flanagan Executive Director with responsibility for Development and
Page 240

Page 241

Economic Growth 
Policy Lead for Strategic Development: Councillor Robin Currie 
July 2023                                      
For further information contact: 
Jonathan Welch, Rural Growth Deal Programme Manager
Jonathan.Welch@argyll-bute.gov.uk   
Aileen Semple, Rural Growth Deal Project Officer
Aileen.Semple@argyll-bute.gov.uk 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Page 241

Page 242

This page is intentionally left blank

Page 243

Document is Restricted
Page 243 Agenda Item 13bNOT FOR PUBLICATION by virtue of paragraph(s) 8, 9
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 244

This page is intentionally left blank