Page 1

ARGYLL AND BUTE COUNCIL            POLICY AND RESOURCES
COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH                    7 DECEMBER 2023 
CONSERVATION AREA REGENERATION SCHEME (CARS) PROJECTS – 2-4
AND 6-10 ARGYLL STREET, LOCHGILPHEAD 
1.0 EXECUTIVE SUMMARY 
1.1 The Lochgilphead Conservation Area Regeneration Scheme (CARS) is a grant
programme focussing on the regeneration of historical buildings as well as
traditional skills training and community engagement.   Lochgilphead CARS is
jointly funded by, Historic Environment Scotland and Argyll and Bute Council
together with contributions from building owners. 
1.2 Argyll and Bute Council has recognised a need for greater economic
investment and regeneration activities within town centres including
Lochgilphead.  The proposed works align to the objectives set by the
Executive Leadership Team to reduce the number of properties within town
centres falling into disrepair. 
1.3 2-4 Argyll Street and 6-10 Argyll Street are the final two priority buildings for
Lochgilphead CARS. Both buildings are located in the heart of the
Lochgilphead Conservation Area overlooking Argyll Street/Colchester Square. 
1.4 Lochgilphead CARS and Housing Services staff have been working with the
owners of these properties since 2020.  Delays due to COVID and ownership
issues have meant the original projected costs have escalated above the
remaining CARS budget by a combined total of £137,271.46.  The Private
Sector Housing Grant (PSHG) budget for 2023/24 is well within budget, and
providing the gap funding to facilitate this project aligns with the key aims of
the PSHG to extend the life of capital assets. 
1.5 This request for additional PSHG for these two priority buildings is not linked
to the recent award of Place Based Investment (PBI) funding for Lochgilphead
CARS.  The PBI funding has been allocated for shopfront improvements and
high level amenity works including repainting front elevations.  In respect of
the high level amenity works, this will be targeted at buildings that are not
eligible for CARS grant funding.

Page 2

RECOMMENDATIONS 
It is recommended that Members of the Policy and Resources Committee
consider and approve the utilisation of Private Sector Housing Grant (PSHG)
to award an additional £137,271.46 grant to the 2-4 Argyll Street and 6-10
Argyll Street Lochgilphead CARS projects, thus providing essential gap
funding to facilitate the essential repair and conservation of these buildings.

Page 3

ARGYLL AND BUTE COUNCIL            POLICY AND RESOURCES
COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH                    7 DECEMBER 2023 
CONSERVATION AREA REGENERATION SCHEME (CARS) PROJECTS – 2-4
AND 6-10 ARGYLL STREET, LOCHGILPHEAD 
2.0 INTRODUCTION 
2.1 This report outlines the gap funding that exists in the final two priority buildings
of the Lochgilphead Conservation Area Regeneration Scheme (CARS).  The
CARS is funded by Historic Environment Scotland and Argyll and Bute Council
with contributions from building owners.  The report requests utilisation of an
additional £137,271.46 grant funding from the PSHG budget to cover that gap
and facilitate these two key projects.   
3.0 RECOMMENDATIONS 
3.1 It is recommended that Members of the Policy and Resources Committee
consider and approve the utilisation of Private Sector Housing Grant (PSHG)
to award an additional £137,271.46 grant to the 2-4 Argyll Street and 6-10
Argyll Street Lochgilphead CARS projects, thus providing essential gap
funding to facilitate the essential repair and conservation of these buildings. 
4.0 DETAIL 
4.1 2-4 Argyll Street and 6-10 Argyll Street are two adjoining tenement buildings
occupying a key location in Lochgilphead town centre. Both buildings
comprise of two storeys of residential accommodation over fully commercial
ground floors that are currently occupied. These are the final two priority
building projects for Lochgilphead CARS.   
4.2 The general fabric of both buildings is in a very poor condition and both are
suffering from water penetration issues.  Photographs are included at Appendix
1. There is damp ingress in the attic space of both buildings and also in the top
floor flats.  This is having a negative impact on the occupiers quality of life and the

Page 4

buildings are detracting from the townscape and character of the conservation
area.  
4.3 The proposed scope of work for both buildings includes; slated roof works,
associated timber repairs, lead works, rainwater goods, stone works and
renderworks.   All works are in line with HES’s advisory standards of repair.   
4.4 The owners of both buildings formed Owners Associations to enable them to
work together and to repair and maintain their buildings.  Both Owners
Associations have opened bank accounts to deal with all financial transactions. 
With support from Housing Services, both Owners Associations commissioned
a conservation accredited Design Team to carry out Tenement Condition
Surveys.  Following the survey works, the Design Team then produced detailed
Tenement Condition Reports for each building, together with Cost Plans
outlining the likely cost of the works.   
4.5 Lochgilphead CARS and Housing Services staff have been working with the
owners of these properties since 2020.  Delays due to COVID and ownership
have meant the original projected costs (combined) have escalated above the
remaining CARS budget by £137,271.46.  The Private Sector Housing Grant
(PSHG) budget for 2023/24 is well within budget, and providing the gap
funding to facilitate this project aligns with the key aims of the PSHG to extend
the life of capital assets. 
4.6 Total project costs including all construction costs and design fees are based
on the Tender Reports (17 November 2023) from the Design Team.   See
below: 
2-4 Argyll Street:  Total project costs                                                 £388,071.66 
 Total CARS grant available from HES and A&B Council     £221,933.12
 The current eligible PSHG        £ 39,600.00
 Total owners contributions        £ 50,500.00
 Shortfall         £ 76,038.54 
6-10 Argyll Street:  Total project costs         £336,503.72
 Total CARS grant available from HES and A&B Council      £175,750.80
 The current eligible PSHG         £ 49,520.00
 Total owners contributions         £ 50,000.00 
 Shortfall         £ 61,232.92 
Total Shortfall         £137,271.46

Page 5

4.7 The total shortfall is £137,271.46.  The proposal is to utilise additional grant
funding from PSHG to fill this gap.  PSHG should be spent on capital projects
such as; adding value to an asset, extending the life of an asset, or acquiring a
new asset.  The proposed works described in this report meet the finance
parameters for PSHG spend.  Although the PSHG grant funding is larger than
usual it will fall well within the available PSHG budget remaining for this financial
year which would otherwise remain unspent, and will facilitate the completion of
these two key projects within the Lochgilphead CARS. 
5.0 CONCLUSION
5.1 The additional funds proposed would safeguard the fabric of two historic buildings, 
ensuring the continued use of 3 commercial units and 8 residential units.   
5.2 As part of the development of these 2 projects, the owners are now working
closer together and Owners Associations have been formed for both
buildings.  Tenement Condition Surveys have been carried out for both
buildings and the associated Tenement Condition Reports provide the
Owners Associations with Maintenance Schedules, allowing them to plan for
future management and maintenance of their properties. 
5.3 These projects cannot go forward without the additional funding, and 
facilitating both from within the otherwise unspent PSHG budget will allow the 
completion of the last two Lochgilphead CARS priority buildings. 
6.0 IMPLICATIONS
6.1 Policy – The Outcome Improvement Plan, Economic Strategy and Local
Development Plan support town centre regeneration and a diverse and thriving
economy.
6.2 Financial – The proposed use of PSHG grant funding falls within the criteria for
use of PSHG and will appropriately utilise capital budget which will otherwise
remain unspent in this financial year.  
6.3  Legal – Third party grant contracts will be issued to the private building owners.
6.4  HR - A dedicated project officer is in post for the duration of the Lochgilphead
CARS project.  Staff salaries are included in the project budget.
6.5  Fairer Scotland Duty - 
6.5.1   Equalities - protected characteristics – None. 
6.5.2   Socio-economic Duty – None. 
6.5.3  Islands – None.
6.6 Climate Change - Extremes of weather caused by climate change will
continue to put buildings under pressure. These projects help property owners
undertake large scale building repair projects under the supervision of

Page 6

conservation accredited architects which ensures they are future proofed
against climate change, using traditional building materials.    
6.7 Risk – That grant schemes are oversubscribed or that projects run over time or
budget. These risks will be carefully monitored and mitigation measures
introduced on a case-by-case basis.
6.8  Customer Service – The council is responsible for administering the CARS 
grants on behalf of HES and for ensuring due diligence in the performance of
its duties. 
Kirsty Flanagan Executive Director with responsibility for Development and
Economic Growth 
Councillor Robin Currie, Policy Lead for Strategic Development 
November 2023                                                  
For further information contact:
James Lafferty: Lochgilphead CARS Project Officer, 
james.lafferty@argyll-bute.gov.uk 
Flora Lamont: Team Lead – Housing Operations 
flora.lamont@argyll-bute.gov.uk 
APPENDICES
Appendix 1: Photographs of Argyll Street properties

Page 7

APPENDICES
Appendix 1: Photographs
2 – 4 Argyll St, Lochgilphead 
6 – 10 Argyll St, Lochgilphead 
2 – 10 Argyll St, Lochgilphead (Aug 23)