ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
30 NOVEMBER 2023 
HOUSING EMERGENCY – PROJECT OFFICER RESOURCE 
1.0 INTRODUCTION 
1.1 Following the declaration of the Housing Emergency, the Housing Group has met,
and officers continue to work at speed to explore and develop the potential
interventions that have been requested.  There is an emerging need for the
Council to be more consistently proactive in its approach to facilitating housing
sites both affordable and private and to develop innovative proposals in sufficient
detail to enable their robust justification.  The existing resources of the Services
involved are not able to move these forward at the speed required by the
Housing Emergency.  It is suggested that the allocation of a Project Officer will
assist in accelerating progress. 
2.0 RECOMMENDATION 
Members of the Environment, Development and Infrastructure Committee are
asked to:- 
i. agree and recommend to the Policy and Resources Committee that the
Council recruit a Project Officer to assist in accelerating the work of the
Housing Emergency with funding for this post to be drawn down from the
Council’s Priorities Investment Fund.   
3.0 DETAIL  
3.1 Following the declaration of a Housing Emergency, the Housing Group has met
and officers continue to progress the work proposed in the Environment,
Development and Infrastructure (EDI) Committee.   
3.2 As a result of the Housing Emergency an increased focus is being applied to all
matters which will assist accelerated delivery of improved housing options within
Argyll and Bute, and this work is very broad ranging in scope.  In addition, given
the known difficulties in delivering the current housing land supply within the two
main settlements of Oban and Helensburgh, it is likely to get more challenging. 
3.3 There is a need for the Council to be more consistently proactive in its approach
to facilitating housing sites, both affordable and private.  The Council has

Page 2

previously only undertaken such action sporadically, Dunbeg Kirk Road
Improvement being an example. This proactive approach is necessary both
because of the increasing costs and complexities of development, and the
pressures the housing system is under.  To do so consistently, at scale and at
speed is beyond the existing staff resources of the services likely to be involved
(Planning, Roads, Estates, Legal Services). 
3.4 Immediate interventions are the proactive facilitation of existing potential housing
sites through acquisition of land and provision of road improvements via potential
Compulsory Purchase Order (CPO).  Some housing sites exist which have
already been extensively considered and explored and it is likely that the only
feasible solution for each is through the CPO route.   
3.5 The sites have planning support in principle for the delivery of housing and have
been identified in various ways within our LDP and SHIP.  The two sites in Oban
also have notional allocations of HIF funding from Scottish Government to pay for
the infrastructure improvements.  Given the housing emergency, there is a fairly
solid policy argument to justify pursuing a CPO route, albeit it will need to be twin
tracked with ongoing discussion with the developers and landowners.  However
in order to pursue this it is first necessary to establish with more detailed design
work that the proposed outline solutions are physically deliverable before the
Council can be requested to make a firm decision to pursue a Compulsory
Purchase Order (CPO) route, and to consider the legal process in order to
establish that we have laid the necessary justification.  This work can reasonably
be initiated now but will require resources to pursue it.   
3.6 It is requested that a Project Officer be appointed to concentrate on developing
these matters in the first instance.  The Project Officer would likely be, though not
necessarily, a property professional (Surveyor / Planner / Engineer), preferable
with experience of bringing forward development sites and or delivering CPOs or
other land assembly exercise. If this is a temporary post it is suggested 3 years
as a minimum will allow progress on some of the substantive issues.  An
LGE11/12 grade is considered appropriate, along with supporting budget for
laptop/phone/travel, a budget of £200,000 would be required.  In addition it is
anticipated that there may be subsequent requests for research & capital costs as
the various projects are developed, but at present there is insufficient detail to
estimate these. This could be substantial depending on what works are
prioritised and funding cannot be sourced elsewhere i.e. spend to save; RGD;
Scottish Government and Strategic Housing Fund. 
3.7 The continuing work of the Housing group will additionally generate numerous
other work streams to support potential radical interventions in the short to
medium term and the proposed Project Officer can be utilised to contribute to /
lead some or all of these.  Some options include: 
• Exploring a Council buy back and resale scheme of second homes or holiday
lets which come to the market, adding a primary occupancy burden before re-
sale, thus directly bringing properties back in to residential use.  This could
capitalize on the potential effect of short term licensing, the introduction of

Page 3

planning control areas, and potential changes to the Council tax and NDR
regimes.
• Facilitating private new build sites through purchase (and re-sale) or
underwriting private units for sale, or delivering infrastructure: Craignure; Port
Ellen, Bowmore Masterplan, and Dunbeg.
• Developing a Council civils contracting arm available to plug the gap in the
local contractor market.
• Supporting specific research for Strategic Land Identification at scale near
Oban & Helensburgh.  PLDP2 commits us to deliver the OSDF and HSDF to
identify land for growth for the next 20-40 years.  Work has started in the
planning policy team but will require support and funding to carry out specialist
research (transport assessments, infrastructure and junction feasibilities,
Flood Studies etc…).  Collectively these studies will be looking to identify land
for as much as 4000 units which would create the scale to justify strategic
infrastructure investment (subject to separate project mandate submission). 
4.0 CONCLUSION 
4.1 Work is underway at pace by the Housing Group, as required by ELT and the
declaration of a Housing Emergency.  There is a need for a more consistent
proactive approach to facilitating both private and affordable housing
development and to continue to investigate and develop the innovative
interventions that are expected, in adequate detail to robustly justify their
recommendation.  The existing resources of the Services involved are not able
to move these forward at the speed required by the Housing Emergency, and it
is suggested the allocation of a Project Officer will assist in accelerating
progress funded from the Council’s Priorities Investment Fund. 
5.0 IMPLICATIONS 
5.1  Policy  – The ongoing activity is consistent with current Council priorities and
the Local Housing Strategy vision and outcomes which are directly aligned
with the overarching objectives of the Outcome Improvement Plan, in
particular Outcome 2 – we have infrastructure that supports sustainable
growth. 
5.2  Financial – The post and supporting budget will cost £200,000 over a 3 year
period with a recommendation that this is funded from the Council’s Priorities
Investment Fund. 
5.3   Legal – None.   
5.4    HR – Creation of a temporary post for a period of 3 years.   
5.5   Equalities (Fairer Duty Scotland) – The activity outlined in the report is
consistent with aims and objectives set out in the local housing strategy, which
is subject to an EQIA.

Page 4

5.5.1  Equalities – Protected Characteristics – There are targets set within the SHIP
to deliver housing which meet the needs of specialist groups. 
5.5.2  Social-Economic Characteristics – The delivery of affordable housing across
Argyll and Bute facilitates socio-economic opportunities for all. The SHIP links
with the Child Poverty Strategy. 
5.5.3  Islands – The delivery of affordable housing across Argyll and Bute facilitates
socio-economic opportunities for all. The SHIP links with the Child Poverty
Strategy. 
5.6  Risk – Takes longer to progress with interventions to deal with the Housing
Emergency. 
5.7  Climate Change – The Council is committed to working towards net zero. 
5.8  Customer Service – None.     
Kirsty Flanagan, Executive Director with Responsibility for Development and
Economic Growth 
Councillor Robin Currie, Policy Lead for Strategic Development 
October 2023 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth   
fergus.murray@argyll-bute.gov.uk 
Matt Mulderrig, Development Policy and Housing Manager
matt.mulderrig@argyll-bute.gov.uk