Argyll and Bute Council · 15 August 2024
Back to Policy and Resources Committee — 15 August 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
8 August 2024 
NOTICE OF MEETING 
A meeting of the POLICY AND RESOURCES COMMITTEE will be held ON A HYBRID BASIS IN
THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS on
THURSDAY, 15 AUGUST 2024 at 10:30 AM, or at the conclusion of the Special meeting of Argyll
and Bute Council at 10.00am on the same date, whichever is the later, which you are requested to
attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
3. MINUTES (Pages 5 - 10)  
Policy and Resources Committee held on 9 May 2024
* 4. FINANCIAL REPORTS MONITORING PACK - 30 JUNE 2024 (Pages 11 - 124)  
Report by Section 95 Officer 
5. BUDGET OUTLOOK 
(a) BUDGET OUTLOOK 2025/26 TO 2029-30 (Pages 125 - 144)   
Report by Section 95 Officer  
(b) EDUCATION NETWORK TRANSFORMATION PROGRAMME 
(Pages 145 - 164)   
Report by Executive Director with responsibility for Education and
Customer Support Services 
6. CORPORATE DEBT RECOVERY POLICY 2024 (Pages 165 - 184)  
Report by Executive Director with responsibility for Financial Services 
Public Document Pack

Page 2

7. NATIONAL CARE SERVICE: STAGE 2 SCRUTINY: CALL FOR VIEWS 
(Pages 185 - 196)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
8. REDIRECTION OF CROWN ESTATES FUNDING (Pages 197 - 202)  
Report by Executive Director with responsibility for Development and Economic
Growth 
9. UPDATE: ARGYLL AND BUTE UK SHARED PROSPERITY FUND INVESTMENT
PLAN INTERVENTIONS (Pages 203 - 212)  
Report by Executive Director with responsibility for Development and Economic
Growth 
10. SCOTTISH GOVERNMENT ISLANDS PROGRAMME AND CARBON NEUTRAL
ISLANDS CAPITAL FUNDING (Pages 213 - 220)  
Report by Executive Director with responsibility for Development and Economic
Growth 
11. ISLANDS COST CRISIS EMERGENCY FUND 2024/25 (Pages 221 - 226)  
Report by Executive Director with responsibility for Development and Economic
Growth 
12. RURAL GROWTH DEAL - UPDATE AND DETAILED DESIGN COSTS 
(Pages 227 - 240)  
Report by Executive Director with responsibility for Development and Economic
Growth 
13. DATA STRATEGY AND ACTION PLAN 2024 - 2028 (Pages 241 - 266)  
Report by Executive Director with responsibility for Development and Economic
Growth 
14. COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 - UPDATE -
EXPRESSIONS OF INTEREST / ASSET TRANSFER REQUESTS /
PARTICIPATION REQUESTS / REPORTING REQUIREMENTS (Pages 267 - 274)  
Report by Executive Director with responsibility for Commercial Services 
15. COUNCIL CARBON EMISSIONS 2022/2023 (Pages 275 - 308)  
Report by Executive Director with responsibility for Commercial Services 
16. CLIMATE CHANGE BOARD UPDATE (Pages 309 - 318)  
Report by Executive Director with responsibility for Commercial Services 
17. SIMPLIFIED PLANNING ZONES: PROPOSED CLOSURE OF PROJECT 
(Pages 319 - 324)  
Recommendation from Planning, Protective Services and Licensing Committee held
on 22 May 2024 
REPORT WITH EXEMPT APPENDIX 
18. OCTOBER 2023 WEATHER EVENT - UPDATE 
(a) Report by Executive Director with responsibility for Roads and
Infrastructure Services (Pages 325 - 336)
E1  (b) Appendix A (Pages 337 - 344)  
(c) Appendix B (Pages 345 - 346)

Page 3

EXEMPT REPORT
E2 19. HELENSBURGH WATERFRONT DEVELOPMENT (COMMERCIAL AREA) -
UPDATE & SELECTION OF PREFERRED DEVELOPER (Pages 347 - 380)  
Report by Executive Director with responsibility for Commercial Services 
REPORTS FOR NOTING 
20. POLICY AND RESOURCES COMMITTEE WORKPLAN (Pages 381 - 384) 
Items marked with an “asterisk” are items, on the basis of information available at the time this
Agenda is published, on which the Committee may not have delegated powers to act, and which
may therefore require to be referred to the Council or another Committee, and that referral may
depend on the decision reached at the meeting. 
The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraphs are:- 
E1 Paragraph 6  Information relating to the financial or business affairs of any particular
person (other than the authority).
Paragraph 9  Any terms proposed or to be proposed by or to the authority in the course of
negotiations for a contract for the acquisition or disposal of property or the supply of goods
or services. 
E2 Paragraph 6  Information relating to the financial or business affairs of any particular
person (other than the authority). 
Policy and Resources Committee 
Councillor John Armour Councillor Gordon Blair
Councillor Math Campbell-Sturgess Councillor Audrey Forrest (Vice-Chair)
Councillor Kieron Green Councillor Amanda Hampsey
Councillor Mark Irvine Councillor Reeni Kennedy-Boyle
Councillor Jim Lynch (Chair) Councillor Luna Martin
Councillor Liz McCabe Councillor Dougie McFadzean
Councillor Yvonne McNeilly Councillor Ross Moreland
Councillor Gary Mulvaney Councillor Dougie Philand   
Contact: Hazel MacInnes  Tel: 01546 604269

Page 4

This page is intentionally left blank

Page 5

MINUTES of MEETING of POLICY AND RESOURCES COMMITTEE held ON A HYBRID BASIS IN
THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS 
on THURSDAY, 9 MAY 2024 
Present: Councillor Jim Lynch (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Math Campbell-Sturgess
Councillor Audrey Forrest
Councillor Kieron Green 
Councillor Reeni Kennedy-Boyle
Councillor Liz McCabe
Councillor Dougie McFadzean
Councillor Ross Moreland 
Also Present: Councillor Jan Brown Councillor Luna Martin 
Attending: Pippa Milne, Chief Executive
Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director
Anne Blue, Head of Financial Services
Fergus Murray, Head of Development and Economic Growth
Ross McLaughlin, Head of Commercial Services
Jane Fowler, Head of Customer and Support Services
Shona Barton, Governance Manager
John Gordon, Programme Manager - CHORD 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Robin Currie, Amanda
Hampsey, Mark Irvine, Yvonne McNeilly and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
Councillor Jim Lynch advised in relation to item 7 of the agenda (Latest Update on
the Clipper Round the World Yacht Race Oban Stopover Actions) that he had been
appointed to the Oban BID Board by the Council.  Having taken note of the
Standards Commission Guidance in relation to declarations (issued on 7 December
2021), with specific reference to section 5.4(c), he did not consider that he had a
relevant connection and as such would remain in the meeting. 
3. MINUTES 
The Minutes of the meeting of the Policy and Resources Committee held on 15
February 2024 were approved as a correct record. 
* 4. BUDGET OUTLOOK 
The Committee gave consideration to a report summarising the Budget Outlook
covering the period 2025-26 to 2029-30, taking into consideration the budget
decisions taken at the Council Budget meetings on 22 February and 15 April 2024. 
Decision 
The Policy and Resources Committee noted – 
Page 5 Agenda Item 3

Page 6

1. the current estimated budget outlook for the period 2025-26 to 2028-29; and 
2. the minor changes to fees and charges and agreed to refer them to Council for
endorsement. 
(Reference: Report by Section 95 Officer dated 30 April 2024, submitted) 
* 5. CUSTOMER SERVICE STRATEGY 2024-27 
The Committee gave consideration to a report presenting the new corporate
Customer Service Strategy 2024-27. 
Decision 
The Policy and Resources Committee – 
1. noted the outcomes of the consultations on the draft Customer Service Strategy
and the changes made to it using the customer and employee insights gained
contained at Appendix 2 to the submitted report; and 
2. approved the revised Customer Service Strategy, Charter and Action Plan
contained at Appendix 1 to the submitted report, and associated EQSEIA
contained at Appendix 3 to the submitted report, to proceed to the next full
Council meeting in June 2024. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services dated 9 May 2024, submitted) 
6. LACER SMALL BUSINESS SUPPORT: DIGITAL REVIEWS 
The Committee gave consideration to a report which sought approval to scale up
the provision of digital reviews for small businesses to assist their recovery and
growth using the remainder of the funding allocated to business grants via the Local
Authority COVID Economic Recovery (LACER) money from the Scottish
Government. 
Decision 
The Policy and Resources Committee approved the use of £34,365 earmarked for
business grants with existing LACER Schemes to provide additional fully funded
digital reviews to assist the growth and recovery of small businesses in the area,
particularly in remote rural communities. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 9 April 2024, submitted) 
7. LATEST UPDATE ON THE CLIPPER ROUND THE WORLD YACHT RACE
OBAN STOPOVER ACTIONS 
The Committee gave consideration to a report providing an update on the progress
of the Clipper 2023-2024 Round the World Yacht Race Oban Stopover Actions
Plan. 
Decision
Page 6

Page 7

The Policy and Resources Committee – 
1. noted the progress on actions delivered for the Clipper 2023-2024 Round the
World Yacht Race Oban Stopover contained at Table 1 within the submitted
report; 
2. approved up to £50k of funding to deal with additional costs linked to the event
from the Council’s priority fund; and 
3. noted the key Oban Stopover civic events including the Clipper Award Civic
Ceremony on 16 July 2024, the Clipper Connect Business Event on 19 July
2024 and VIP Reception on the Clipper Race departure day on 21 July 2024. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 10 April 2024, submitted) 
8. LEVELLING UP PARTNERSHIP PROCESS 
The Committee gave consideration to a report inviting the prioritisation of a long list
of projects in relation to Levelling Up Partnership Funding. 
Decision 
The Policy and Resources Committee – 
1. acknowledged the work done by officers to prepare and develop the list of
projects which span Argyll and Bute and which link to a variety of strategic and
local priorities; 
2. welcomed the ongoing engagement with the UK Government at officer level; 
3. noted the process in relation to identifying the projects which would be funded
through the Levelling Up Partnership, that final decisions would be made by the
UK Government and, as a consequence; and 
4. agreed to submit the long list of projects provided in Table 1, without
prioritisation, to the UK Government for consideration and decision as part of
that process. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated April 2024, submitted; and Motion by Councillor Jim Lynch,
seconded by Councillor Audrey Forrest, tabled) 
9. ROTHESAY PAVILION UPDATE REPORT 
The Committee gave consideration to a report providing an update on Rothesay
Pavilion, specifically the Tender Report for the works to complete stages 2 and 3. 
Decision 
The Policy and Resources Committee - 
1. noted the content of the submitted report; and
Page 7

Page 8

2. agreed that a more detailed report be brought forward for consideration and
decision by the Council at its meeting on 27 June 2024. 
(Reference: Report by Executive Director with responsibility for Commercial
Services; and Executive Director with responsibility for Development and Economic
Growth and Financial Services and the Councils Section 95 Officer, submitted) 
The Chair advised that in terms of Section 50(A)(4) of the Local Government
(Scotland) Act 1973, the appendices relating to the following item of business would
require the exclusion of the press and public should any Member wish to discuss
the content of those appendices, on the grounds that it was likely to involve the
disclosure of exempt information as defined in Paragraph 6 of Part 1 of Schedule
7A to the Local Government (Scotland) Act 1973. 
The Committee agreed that they wished to discuss the content of the appendices
and therefore resolved to exclude the press and public for the following item of
business. 
10. LORN ARC TAX INCREMENTAL FINANCE PROGRAMME - OBAN
AIRPORT BUSINESS PARK - OUTLINE BUSINESS CASE 
The Committee gave consideration to a report providing an update on the progress
of the Oban Airport Business Park Project and its relationship to the wider Lorn Arc
Tax Incremental Finance (TIF) Programme. 
Decision 
The Policy and Resources Committee – 
1. noted that discussions were ongoing with the Scottish Government in relation to
varying the TIF agreement to maximise the benefit from the scheme and that
progression of this project was subject to the Scottish Government agreeing to
amend the date by which works must be completed; 
2. approved the submission of the Outline Business Case (OBC) to the TIF
Executive seeking funding of £8.05m (including 15% fees and 10% contingency)
for the development of roads, infrastructure, servicing and site works at Oban
Airport Business Park; 
3. subject to approval by the TIF Executive, approved the drawdown of borrowing
for a total of £1.6m (20% of total cost) for the development of a Full Business
Case and associated fees to progress the Oban Airport Business Park project; 
4. noted the additional resources that would be required to deliver this project in
the form of the establishment of a Project Management Office (PMO) with Hub
North Scotland providing strategic support; and 
5. noted that the Full Business Case would be reported to a future Policy and
Resources Committee before moving to the implementation stage. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 9 April 2024, submitted)
Page 8

Page 9

11. POLICY AND RESOURCES COMMITTEE WORKPLAN 
The Policy and Resources Committee Workplan was before the Committee for
noting. 
Decision 
The Policy and Resources Committee noted the content of the Workplan. 
(Reference: Policy and Resources Committee Workplan as at 9 May 2024,
submitted) 
Page 9

Page 10

This page is intentionally left blank

Page 11

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 15 AUGUST 2024
FINANCIAL REPORTS MONITORING PACK – 30 JUNE 2024  
1. INTRODUCTION 
1.1 This report provides a summary of the financial monitoring reports as at the end of
June 2024. There are five detailed reports, setting out the position as at 30 June
2024, which are summarised in this Executive Summary: 
• Revenue Budget Monitoring Report 
• Monitoring of Financial Risks 
• Capital Plan Monitoring Report 
• Treasury Monitoring Report
• Reserves and Balances 
2. DETAIL 
2.1 Revenue Budget Monitoring Report 
2.1.1 This report provides a summary of the current revenue budget monitoring position to
ensure net expenditure is contained within budget.  It provides corporate and
departmental information with comparisons on a forecast outturn and a year to date
basis. 
2.1.2  There is a forecast overspend of £4.658m as at the end of June 2024.  The
variances are:
- The pressure resulting from the October 2023 weather event of £3.567m.  A
separate report within this pack provides Members with further information.  
- Within Social Work, a forecast overspend of £0.648m relating to demand for
residential placements within Children and Families Services.
- Within Roads and Infrastructure Services, a forecast overspend of £0.500m
relating to new bus contracts for Public and Pupil Transport across Argyll and
Bute.  Note that since the end of June, a further pressure of £0.210m in
relation to bus contracts has been identified as more contracts are renewed,
therefore in the next reporting period the overspend relating to bus contracts
will increase from £0.500m to £0.710m.  
- Within Central Budgets, a forecast overspend of £0.271m is reported in
relation to the inflation on insurance being higher than estimated.
- Within Funding, an over-recovery of Council Tax income on second homes of
£0.328m. 
2.1.3  There is a year to date overspend of £1.140m.  More focus is on the forecast outturn
position, hence why sometimes the year to date position is not updated.  The year to
date variances mainly relate to the timing of income and expenditure and recharging
of costs to capital. 
Page 11 Agenda Item 4

Page 12

2.1.4 Total policy savings relevant to 2024-25 financial year amount to £6.467m.  The
table below outlines their progress as at 30 June 2024.   
Category No. of
Options
2024-25
£000
2024-
25
FTE
2025-26
£000
2025-
26
FTE
Future
Years
£000
Future
Years
FTE
Delivered 4 5,371.0 0.0 5,538.0 0.0 5,538.0 0.0
On Track to be
Delivered 8 965.0 14.9 846.0 14.9 846.0 14.9
Still to be
Implemented 1 0.5 0.0 0.5 0.0 0.5 0.0
Being Developed 0 0.0 0.0 0.0 0.0 0.0 0.0
Will not be achieved 1 100.0 0.0 150.0 0.0 150.0 0.0
Potential Shortfall 1 30.0 0.0 30.0 0.0 30.0 0.0
Delayed 0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 15 6,466.5 14.9 6,564.5 14.9 6,564.5 14.9 
2.1.5 One saving is categorised as potential shortfall and one will not be achieved.   
Health and Social Care Partnership (HSCP) – Financial Update 
2.1.6 The forecast outturn position at the end of June is an estimated overspend of
£1.176m for 2024-25 (£0.648m overspend for Social Work and £0.528m for Health).
The HSCP’s financial position will continue to be monitored and Financial Services
staff will engage with the HSCP Chief Financial Officer to ensure that mitigation
actions are in place to address the deficit and ensure that no additional funding is
required from the Council. 
2.2 Monitoring of Financial Risks 
2.2.1  This report outlines the process and approach developed in carrying out a financial
risks analysis and provides an update on the current assessment of financial risks.   
2.2.2 There are 7 Council wide revenue risks identified for 2024-25 currently amounting to
£3.592m.   
2.2.3 There are currently 42 departmental risks totalling £5.580m.  Of the 42 departmental
risks, 5 are categorised as likely.  These will continue to be monitored and action
taken to mitigate or manage these risks.   
2.2.4 The current top three risks in terms of the financial impact are noted in the table
below. 
Page 12

Page 13

SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance -
Bridges,
Culverts & Sea
Defences
Extreme localised weather
may result in loss of bridge,
culvert, road or sea defence.
3 750
Roads and
Infrastructure
Services
Waste PPP -
Indexation
Historical payments made
towards Waste PPP based
on indexation rates have
been challenged by Renewi
resulting in a potential cost
to the council.
3 586
Financial
Services
Council Tax
Debt Collection
Recovery
Recovery of debt becomes
more difficult to pursue in the
current economic
climate.  This is in relation to
historical debt that has
accumulated over many
years therefore any adverse
collection rates will impact
on the year end debt
provision as opposed to the
in-year financial position,
hence no forecast variance
has been reported within the
current year.
3 345 
2.2.5 
2.2.6
There have been 5 changes to the departmental risks since the report as presented
to the Council on 22 February 2024.  These are outlined in paragraph 3.4.1 of the
Financial Risks Report. 
Three other potential risks relating to funded childcare for 1 and 2 year olds, the
proposed new school campus on Mull and digital access for learners are covered in
section 3.6 of the Financial Risks report.   
2.3 Capital Plan Monitoring Report 
2.3.1 This report provides a summary of the current capital plan monitoring position. 
Information is provided in terms of monitoring year to date budget, current full year
budget, future years total budget and funding and non-financial in terms of project
performance. 
Page 13

Page 14

2.3.2 In recent years, the Council has agreed additional funding for the capital programme
totalling £11.100m to address specific costs related to dealing with COVID,
inflationary pressures arising as a consequence of the factors detailed in paragraph
2.3.3 below and other cost pressures on the capital plan. To date, £8.834m has
been allocated to projects leaving a balance of £2.266m available for allocation as
required. 
2.3.3 The capital programme continues to see significant price increases as well as
disruptions to the supply chain and longer lead in times. The increased rate of
inflation impacts costs such as energy prices, labour, packaging and transport.
These all have an effect on the overall contract price and make it extremely
challenging to manage expenditure and the availability of supply. As a result of this it
should be noted that there are likely to be other significant financial impacts which
are not quantifiable at this stage. 
2.3.4 Actual net expenditure to date is £4.869m compared to a budget for the year to date
of £4.814m giving rise to an overspend for the year to date of £0.055m (1.14%).  
2.3.5 The forecast outturn for 2024-25 is a forecast net expenditure of £37.565m
compared to an annual budget of £37.132m giving rise to a forecast overspend for
the year of £0.433m (1.17%). 
2.3.6 The forecast total net projects costs on the capital plan are £206.634m compared to
a total budget for all projects of £206.634m giving rise to a forecast overspend for
the overall capital plan of £0.433m (0.21%).  
2.3.7 In respect of total project performance, there are 172 projects within the capital plan,
166 are complete or on target, 5 are off target and recoverable and one project is off
track.  
2.4 Treasury Monitoring Report 
2.4.1 This report provides information on the current levels and recent transactions in
relation to the capital financing limit, total borrowing, temporary borrowing and long
term borrowing and investments.   
2.4.2 The net movement in external borrowing for the period 1 April 2024 to 30 June 2024
was a decrease of £5.7m. 
2.4.3 Borrowing is below the Capital Financing Requirement for the period to 30 June
2024, at this stage in the financial year capital expenditure is below target. 
2.4.4 The levels of investments were £59.638m at 30 June 2024. The average rate of
return achieved was 5.276% which is above the target SONIA (Sterling Overnight
Index Average) rate for the same period of 5.200%. 
Page 14

Page 15

2.5 Reserves and Balances 
2.5.1 This report summarises the overall level of reserves and balances and monitors the
spending of the earmarked reserves, providing detailed information on the unspent
budget earmarked balances.   
2.5.2 The Council has a total of £689.113m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
2.5.3 At 31 March 2024, the Council had a total of £121.701m of usable reserves.  Of this: 
• £2.763m relates to the Repairs and Renewals Fund
• £3.197m relates to Capital Funds
• £115.741m was held in the General Fund, with £107.443m of this balance
earmarked for specific purposes. 
2.5.4  At the budget setting meeting on 22 February 2024, as part of the revenue budget,
Council agreed to the transfer Strathclyde Pension Fund contribution savings of
£6.875m relating to Council staff and £3.053m relating to Social Work staff to
reserves.  It was also agreed that £1.875m of revenue surplus within 2024-25 be
transferred to the Capital Plan.  As the commitments for these include expenditure
within 2024-25 year, these have been immediately recognised within the earmarked
reserves balances to allow them to be spent accordingly.  This results in a total in-
year earmarked balance of £119.246m.
2.5.5 Of the earmarked balance of £119.246m:
• £60.078m is invested or committed for major initiatives/capital projects 
• £28.359m is still to be drawn down in 2024-25
• £30.809m is planned to be spent in future years 
2.5.6 The table below summarises the position of the unallocated General Fund balance. 
Further explanation of the figures can be found at Section 3.4 of the Reserves and
Balances report.  
Heading Detail £000
Unallocated General Fund
as at 31 March 2024
This is the balance that is
unallocated over and above the 2%
contingency, which amounts to
£6.039m
2,259
Current Forecast Outturn
for 2024-25 as at 30 June
2024
Per paragraph 3.4.2.  (4,658)
Social Work outturn
adjustment
Per paragraph 3.4.3 - Social Work
would expect to transfer any surplus
to internal IJB reserves
648
Page 15

Page 16

Sub-total – potential
unallocated balance as
at 31 March 2025
*If no separate action is taken
regarding the weather event
overspend, the unallocated
general fund balance would fall
below 0
(1,751)
Options to pay for weather
related incident
Members have been presented with
options to cover the pressures
resulting from the weather incident
3,567
Estimated Unallocated
balance as at 31 March
2025 
1,816 
* If Members do not agree to the options outlined in the separate report and the
unallocated general fund balance falls below the amount available and moves into
contingency then a recovery plan would be required to bring the contingency level
back up to the agreed amount. 
2.5.6 It can be seen that, after taking into consideration the current forecast outturn for
2024-25 and assuming Members agree to the proposed actions regarding the
weather event, is estimated to have a £1.816m surplus over contingency. 
2.6 VIREMENTS OVER £0.200m (Revenue) 
2.6.1 Virement is the process of transferring budget between cost centres, services or
departments or between capital projects.  The Council’s constitution notes that
virements over £0.200m require approval by Council.  This section of the report will
be used to outline revenue virements in the period that require approval.   Capital
virements are included within the capital monitoring report. 
2.6.2 For the period April to June, there are no virements requiring authorisation: 
2.6.3 There is one virement relating to 2023-24 that requires authorisation.  This virement
was completed late in the year end process therefore did not appear on the report to
Council on 25 June 2024.  It is:   
- £0.288m from Education to reserves to recognise the Capital Items
Replacement Fund (the repairs and renewals fund that schools have access
to). 
3.  RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee: 
a) Consider the revenue budget monitoring report as at 30 June 2024. 
Page 16

Page 17

b) Note the financial risks for 2024-25. 
c) Note the capital plan monitoring report as at 30 June 2024 and approve the
proposed changes to the capital plan outlined in Appendix 4 of that report. 
d) Note the treasury monitoring report as at 30 June 2024. 
e) Consider the reserves and balances report as at 30 June 2024.  
f) Note that there were no revenue virements over £0.200m between April and
June 2024. 
g) Recommend to Council that the revenue budget virement over £0.200m
outstanding from 2023-24 is approved, per paragraph 2.6.3. 
4. IMPLICATIONS 
4.1 Policy – None.
4.2 Financial -  Outlines the revenue and capital monitoring
for 2024-25 as at 30 June 2024
4.3 Legal -  None.
4.4 HR -  None.
4.5 Fairer Scotland Duty -   None.
4.5.1 Equalities – protected
characteristics - 
None.
4.5.2 Socio-economic Duty -  None.
4.5.3 Islands -  None.
4.6 Climate Change - None.
4.7 Risk -  Risks are included in financial risks report. 
4.8 Customer Service -  None. 
4.9 The Rights of the Child (UNCRC) -  None. 
Kirsty Flanagan
Executive Director /Section 95 Officer
6 August 2024 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk 
Page 17

Page 18

REVENUE BUDGET MONITORING REPORT AS AT 30 JUNE 2024 POLICY AND RESOURCES COMMITTEE
15 AUGUST 2024 
2024-25 Overall Position:
There is a forecast overspend of £4.658m as at the end of June 2024.  The pressure relating to the October 2023 Weather Event has been
quantified and is a £3.567m overspend against revenue budgets.  A separate report on this agenda provides Members with further detail. 
Within Social Work, there is a forecast overspend of £0.648m relating to demand for residential placements within Children and Families
Services.  Within Executive Director Kirsty Flanagan, there is a forecast overspend of £0.500m due to the cost of new Bus Contracts for Public
and Pupil Transport across Argyll and Bute.  Note that since the end of June, a further pressure of £0.210m in relation to bus contracts has
been identified as more contracts are renewed therefore in the next reporting period, the forecast overspend relating to bus contracts will
increase from £0.500m to £0.710m.  Within Central Budgets, an overspend of £0.271m is reported in relation to the inflation on insurance
being higher than estimated.  Within funding, there is a projected over-recovery of income for Council Tax on 2nd Homes of £0.328m. 
There is a year to date overspend of £1.140m.  The year to date variances within the departments tend to relate to the timing of income and
expenditure and costs to capital not recharged yet. 
Key Highlights as at June 2024:  
• Council services are projecting an overspend of £4.658m as at 30 June 2024.  It is early in the budget monitoring process and
projections will be refined as the year progresses.  In the separate report regarding the Weather Incident, Members have been provided
with options to consider to cover the estimated overspends.
• Negotiations regarding the 2024-25 pay award are ongoing therefore salary costs are currently understated and the impact on the
forecast outturn position of any increase beyond the 3% already built into the budget cannot be quantified at this stage. 
Key Financial Successes:
Performance against budget for 2023-24 was an overall net favourable position of £1.728m underspend after adjusting for year-end
earmarking.  This breaks down as:
• £1.037m net overspend in relation to Council expenditure (excluding loans fund)
• £0.033m over-recovery of Council Tax income
• £5.932m underspend from the Loans Fund due to a higher return on investments than in the previous year, limiting new borrowing by
utilising cash balances instead, slippage within the capital programme and a one-off treasury gain as a result of a discount on the early
repayment of loans
• £3.200m of new unspent budget earmarkings 
Page 18

Page 19

Key Financial Challenges: Proposed Actions to address Financial Challenges:
Addressing service demand/expectation and the increasing challenges
facing departments across the Council in relation to the recruitment and
retention of suitably qualified and experienced staff.
Engagement and monitoring of both issues with departments to
assess how these challenges are affecting service capacity and
capability, staff attendance, utilisation of agency staff and costs.
Collaboration with services and other back-office teams to consider
and develop mitigating actions.
Achieving a favourable year-end position and achieving savings targets
in light of council wide risks to expenditure. 
Robust monitoring of the financial position and delivery of savings to
ensure budget issues inform the budget monitoring process.
Monitoring Social Work expenditure and more widely the IJB position as
any overspend will transfer back to partner bodies in the first instance.  
Continue to work closely with the CFO of the IJB to ensure that early
indication of any potential adverse financial outturn is identified and
corrective action is agreed as appropriate to reduce the risk to the
Council. 
Identifying further savings and delivering services more efficiently with
less resources, as whilst a balanced 2024-25 budget was agreed in
February 2024 there are still significant budget gaps in future years.
The Council will continue to progress savings options identified,
refine options that require further development and seek to identify
further savings through themed reviews and business process
reviews. A longer term approach is being explored with the intention
to develop a pipeline of savings that can be delivered over a number
of years.
Maintaining or improving the level of service income recovered, for
example planning, building standards and car parking.  
Actively monitor income recovery and ensure Council fees and
charges policies are regularly reviewed. 
Managing spend in service areas which are demand led and, to some
extent, outwith service control, for example Winter Maintenance. 
Use a risk-based approach to budget monitoring to focus additional
attention on these areas.
Ongoing requirement to fund unavoidable inflationary increases in areas
like utility costs, fuel, food etc. 
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be evaluated and reported through the
budget monitoring and preparation processes. 
Cost of living crisis impacting on pay inflation negotiations which could
result in pay awards above what is deemed affordable.
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be evaluated and reported through the
budget monitoring and preparation processes.
Future ongoing impact on revenue budgets as a result of the delivery of
substantial capital projects such as Rothesay Pavilion and a new school
on Mull.
Ensure costs are identified and reported on early in the process so
Members are aware of the ongoing financial impact to budgets.
Monitor and report on these regularly as part of the routine budget
monitoring once the projects are complete.
Delivery of climate change measures which can be costly and result in
overspends.
The Council will look at financially sustainable options and closely
monitor the impact of these on the budget position. 
Page 19

Page 20

Forecast Outturn Position
There is a forecast underspend of £4.658m for 2024-25 as at 30 June 2024.
Department
Annual
Budget   
£'000
Forecast
Outturn   
£'000
Current
Forecast
Variance
£'000
Previous
Forecast
Variance
£000
Change
£000 Explanation
Chief Executive's Unit 996 996 0 0 0
Executive Director (Douglas Hendry) 145,610 145,610 0 0 0
Executive Director (Kirsty Flanagan) 56,081 56,581 (500) 0 (500) This is due to the cost of new Bus Contracts for Public and Pupil Transport
across Argyll and Bute. 
Weather related incident ongoing
costs 0 3,567 (3,567) (3,567) This is the projected revenue overspend from the October 2023 weather event. A
separate report on the agenda provides Members with further detail on this.
Social Work 78,466 79,114 (648) 0 (648) The projected overspend is due to demand for residential placements within
Children and Families Services.
Central Budgets 20,812 21,083 (271) 0 (271) The projected overspend is due to pressure on the insurances budgets due to
inflation being higher than estimated.
Financed By (301,965) (302,293) 328 0 328 There is a projected over recovery of income for Council tax on 2nd homes.
Total 0 4,658 (4,658) 0 (4,658) 
Further information on the departmental forecast variances is included later on in the report. 
Page 20

Page 21

(4,000)
(3,500)
(3,000)
(2,500)
(2,000)
(1,500)
(1,000)
(500)
0
500
April
May
June
July
August
September
October
November
December
January
February
£ 000
Forecast outturn position for each Department from the start of the financial year
Chief Executive's Unit
Executive Director (Douglas Hendry)
Executive Director (Kirsty Flanagan)
Weather incident
Social Work
Central Budgets
Underspend
Overspend
Page 21

Page 22

Year to Date Position
The year to date position as at 30 June 2024 is an overspend of £1.140m and the main variances are noted below. 
Department
YTD
Actual
£'000
YTD
Budget
£'000
YTD
Variance   
£'000
Explanation
Chief Executive's Unit 222 190 (32)
Executive Director (Douglas Hendry) 35,169 35,417 248
Executive Director (Kirsty Flanagan) 16,484 12,717 (3,767)
Social Work 2,861 2,780 (81)
Central Budgets (2,484) 8 2,492
Funding (80,182) (80,182) 0
Total Net Expenditure (27,930) (29,070) (1,140)
The year to date variance is largely due to profiling of budgets as opposed to
geniune under or overspends.  This will be rectified in the coming weeks.
Page 22

Page 23

Further information on the departmental year to date variances is included later on in the report. 
-25%
0%
25%
50%
75%
100%
Chief Executive's Unit
Executive Director (Kirsty Flanagan)
Executive Director (Douglas Hendry)
Social W
ork
Central Budgets
TOTAL
Expenditure to date against the remaining budget for each Department
YTD Actual £000 Remaining Budget £000
Page 23

Page 24

OBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 30 JUNE 2024 
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual Budget Forecast
Outturn
Forecast
Variance
Variance
£'000 £'000 £'000 % £'000 £'000 £'000 %
Departmental Budgets
Chief Executive's Unit 222 190 (32) (16.8%) 996 996 0 0.0%
Executive Director (Douglas Hendry) 35,169 35,417 248 0.7% 145,610 145,610 0 0.0%
Executive Director (Kirsty Flanagan) 16,484 12,717 (3,767) (29.6%) 56,081 56,581 (500) (0.9%)
Weather related incident ongoing costs 0 0 0 0.0% 0 3,567 (3,567) #DIV/0!
Social Work 2,861 2,780 (81) (2.9%) 78,466 79,114 (648) (0.8%)
Total Departmental Budgets 54,736 51,104 (3,632) (7.1%) 281,153 285,868 (4,715) (1.7%)
Central Budgets
Other Operating Income and Expenditure (3,602) 303 3,905 1288.8% 1,996 1,996 0 0.0%
Joint Boards 317 364 47 12.9% 1,458 1,458 0 0.0%
Non-Controllable Costs 801 (659) (1,460) 221.6% 17,358 17,629 (271) (1.6%)
Total Central Budgets (2,484) 8 2,492 31150.0% 20,812 21,083 (271) (1.3%)
TOTAL NET EXPENDITURE 52,252 51,112 (1,140) (2.2%) 301,965 306,951 (4,986) (1.7%)
Financed By
Aggregate External Finance (60,201) (60,201) 0 0.0% (248,490) (248,490) 0 0.0%
Local Tax Requirement (19,981) (19,981) 0 0.0% (63,278) (63,606) 328 (0.5%)
Contributions to General Fund 0 0 0 0.0% 9,803 9,803 0 0.0%
Earmarked Reserves 0 0 0 0.0% 0 0 0 0.0%
Total Funding (80,182) (80,182) 0 0.0% (301,965) (302,293) 328 (0.1%)
(Deficit)/Surplus for Period (27,930) (29,070) (1,140) 0 4,658 (4,658)
CURRENT PROJECTED FINAL OUTTURNYEAR TO DATE POSITION
Page 24

Page 25

SUBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 30 JUNE 2024 
YEAR TO DATE POSITION CURRENT PROJECTED FINAL OUTTURN  
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual
Budget
Forecast
Outturn
Forecast
Variance
Variance  
£'000 £'000 £'000 % £'000 £'000 £'000 %
Subjective Category                
Employee Expenses 41,707 40,843 (864) (2.1%) 189,327 190,004 (677) (0.4%)
Premises Related Expenditure 2,631 3,263 632 19.4% 21,349 21,316 33 0.2%
Supplies and Services 7,068 6,602 (466) (7.1%) 23,887 24,074 (187) (0.8%)
Transport Related Expenditure 4,116 3,075 (1,041) (33.9%) 17,775 17,774 1 0.0%
Third Party Payments 36,910 37,746 836 2.2% 182,130 187,645 (5,515) (3.0%)
Capital Financing 213 (1,215) (1,428)   10,626 10,626 0 0.0%
TOTAL EXPENDITURE 92,645 90,314 (2,331) (2.6%) 445,094 451,439 (6,345) (1.4%)
Income (120,575) (119,384) 1,191 (1.0%) (445,094) (446,781) 1,687 (0.4%)
(Deficit)/Surplus for Period (27,930) (29,070) (1,140)   0 4,658 (4,658)   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget. 
Page 25

Page 26

CHIEF EXECUTIVE’S UNIT – AS AT 30 JUNE 2024 
The department is currently forecasting spend in line with budget. 
The department has a year to date overspend of £0.032m (16.8%) which can be attributed to budget profiling issues. 
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Chief Executive 996 996 0 0 0
Totals 996 996 0 0 0
Year to Date Position 
Key Financial Successes:
• All savings options have been delivered.  
• The department’s 2023-24 outturn position was an underspend of £0.006m. This resulted from an overall underspend of £0.013m offset
by earmarking of £0.008m due to an auto-carry forward for unspent grants.   
Key Financial Challenges: Proposed Actions to address Financial Challenges:
To continue to deliver a high-quality service to support community
engagement and participation.
Regular monitoring, reflection and improvement cycle on service
provision to ensure most efficient use of staffing and financial
resources to meet national and local policy requirements for quality
engagement.
To continue to deliver a high quality support service function to community
organisations and community planning partners during a time of challenge
arising from continuing reductions in funding.
Within the partnership working of the CPP we seek to establish
working groups and collate resources within this to deliver high
quality solutions to identified needs.
0%
25%
50%
75%
100%
Chief Executive
Expenditure to date against the remaining budget for each
Service
YTD
Actual
£000
Remaining Budget
£000
Page 26

Page 27

Demands for funding from community applications to the Supporting
Communities Fund higher than available annual funds by about 40%.
Continue to monitor fund criteria adapting this to align with priority
outcomes for Argyll & Bute and continue to support groups to seek
alternative sources of funding from our database of funding
providers.
Page 27

Page 28

CHIEF EXECUTIVE’S UNIT – OBJECTIVE SUMMARY AS AT 30 JUNE 2024 
Service Area YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Executive 88 87 (1) (1.2%) 414 414 0 0.0% Outwith reporting criteria.
Community Planning
& Development 134 103 (31) (30.1%) 582 582 0 0.0%
Posts funded from earmarked
reserves/other funding - will be
corrected in July.  
222 190 (32) (16.8%) 996 996 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.  Page 28

Page 29

CHIEF EXECUTIVE’S UNIT – SUBJECTIVE SUMMARY AS AT 30 JUNE 2024
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 210 173 (37) (21.4%) 838 838 0 0.0% Overspend caused by posts funded from
earmarkings/other budgets - will be rectified in July
Supplies and
Services 10 3 (7) (233.3%) 12 12 0 0.0% Profiling issues, will be rectified in July.
Transport 1 3 2 66.7% 14 14 0 0.0% Underspend on staff travel budgets.
Third Party 1 15 14 93.3% 149 149 0 0.0% Profiling issues, will be rectified in July.
Income 0 (4) (4) 100.0% (17) (17) 0 0.0% Profiling issues, will be rectified in July.
Totals 222 190 (32) (16.8%) 996 996 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 29

Page 30

CHIEF EXECUTIVE’S UNIT – RED VARIANCES AS AT 30 JUNE 2024
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation      
0 0.0%   
A red variance is a forecast variance which is greater than +/- £50,000. 
Page 30

Page 31

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – AS AT 30 JUNE 2024  
The department is currently forecasting spend in line with budget. 
The department has a year to date (YTD) underspend of £0.248m (0.7%).  The year to date underspend is mainly due to the current budget
profile which will be refined through July.                           
Forecast Outturn Position 
Service Annual
Budget 
£000
Forecast
Outturn 
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change 
£000
Executive Director
(Douglas Hendry) 74 74 0 0 0
Head of
Commercial
Services
10,448 10,448 0 0 0
Head of Education 113,752 113,752 0 0 0
Head of Legal and
Regulatory
Support
21,336 21,336 0 0 0
Totals 145,610 145,610 0 0 0 
Year to Date Position 
0%
25%
50%
75%
100%
Executive Director
(Douglas Hendry)
Head of
Commercial
Services
Head of Education Head of Legal and
Regulatory Support
Expenditure to date against the remaining budget for each
Service
YTD
Actual
£000
Remaining Budget
£000
Page 31

Page 32

Key Financial Successes:
The 2023-24 year-end consolidated outturn position was an under spend of £0.690m after adjusting for automatic earmarking. Contributing
factors included:
• Effective contract management of NPDO and Hub School contracts, including a lower-than-expected insurance premium due to the
annual renegotiation of insurance costs. 
• Successful negotiations with utility suppliers achieved further historic water charge refunds and ongoing reductions to water rates.
• Implementation of NDEEF project resulting in recurring annual saving in utilities and a significant contribution to meeting Net Zero
targets.
• Rationalisation of office space through Our Modern Workspace Programme has reduced utility costs, printer costs and cleaning costs
as well as receiving Non-Domestic Rates relief for closed buildings. 
• Income generation within Early Years, including expansion at Rothesay Joint Campus to accommodate care for children under the age
of 2 
Key Financial Challenges: Proposed Actions to address Financial Challenges:
The legacy impact of COVID-19 on our young learners has led to an
increased demand on the additional support need functions of the
Education Service in response to the growing health and wellbeing
needs of our young people and their families. This increase is consistent
across Scotland.
Analysis and review of delivery models has taken place, robust
costings of any agreed changes to delivery model and continual
monitoring of associated budgets.  Maximise use of Additional
Support for Learning Funding and Mental Health and Wellbeing
Funding whilst working collaboratively across Children’s Services.
Impact of the current cost of living crisis on the cost of the school day for
learners and their families.
Work with schools to ensure effective use of Strategic Equity
Funding and Pupil Equity Funding to close the poverty related
attainment gap and identify other funding sources to ensure equity
of experience for all children.
Impact of the current cost of living crisis on uptake in demand led service
areas like catering, design services and licensing.
Continually refine/develop systems to accurately forecast service
usage, budget outturn and future budget requirements.  Strategies
in place to redesign services in line with demand. 
Rising cost of material and labour costs within the Central Repairs
Budget across the department may result in a reduction in activity or
overspends.
Costs are monitored regularly and contained as much as possible
with any unavoidable overspends highlighted as soon as known. 
Ensure that the School Catering Service remains efficient and effective
as the impact of high inflation on produce and a requirement to adhere to
the Statutory Guidance supporting Nutritional Requirements for Food and
Drink in Schools (Scotland) Regulations 2020, has increased the cost of
producing a school meal.
Through good procurement of supplies and the introduction of a
school meal pre order app that will reduce food waste. Produce
meals that pupils want to eat through regular consultation and a
range of menu choices.
Page 32

Page 33

The Council has a requirement to deliver 1140 hours of Early Learning
and Childcare (ELC) to eligible 2-year-olds and all 3–5-year-old children.
Following two years of reduced funding the service must continually
redesign to fit the resources available. 
Robust service costings, financial monitoring and timely reporting
to ensure the service can be delivered within the available budget.
Medium term forecasting on population to shape ongoing service
redesign. Analysis of potential to extend income generation using
“spare” capacity to trial paid care for under 2’s
Impact of high inflationary uplifts within the NPDO/HUB School contracts.  Ensuring continued effective contract management of NPDO/HUB
Schools to minimise the impact of high inflationary uplifts. 
The Scottish Government has Ringfenced some Education funding which
is dependent on Maintaining Teacher Numbers (MTN) to a set level. The
target has increased for 2024-25 with no increase in funding.
Monitor teacher numbers and associated costs, highlighting any
budget pressures immediately.  If teacher numbers fall due to
delays in recruitment, report the potential financial penalty to
departmental management. 
Page 33

Page 34

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – OBJECTIVE SUMMARY AS AT 30 JUNE 2024 
Service Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director
(Douglas
Hendry)
Central/Management
Costs
80 86 6 7.0% 74 74 0 0.0% Outwith Reporting Criteria    
80 86 6 7.0% 74 74 0 0.0%  
Head of
Commercial
Services
Catering 75 (142) (217) 152.8% 321 321 0 0.0% The YTD overspend is largely due to
timing of school meal recharges for
which budgets will be reprofiled. 
Head of
Commercial
Services
Central/Management
Costs
287 288 1 0.4% 1,721 1,721 0 0.0% Outwith Reporting Criteria
Head of
Commercial
Services
CHORD 30 14 (16) (114.3%) 24 24 0 0.0% The YTD overspend is largely due to
timing of recharges to capital
projects. 
Head of
Commercial
Services
Cleaning (58) 9 67 744.4% 400 400 0 0.0% The YTD underspend is largely due
to timing of recharges to Education
and reduced use of bank staff. 
Head of
Commercial
Services
Culture, Heritage,
Recreation & Sport
1,313 1,354 41 3.0% 5,669 5,669 0 0.0% Outwith Reporting Criteria
Head of
Commercial
Services
Events &
Commercial
Catering
36 (15) (51) 340.0% 7 7 0 0.0% The YTD overspend is due to under-
recovery of income budgets within
Events and Commercial Cafes. 
Head of
Commercial
Services
Property Portfolio (110) (53) 57 (107.6%) (189) (189) 0 0.0% The YTD underspend is due to
profiling of budgets relating to rental
income from industrial sites and
investment properties. 
Head of
Commercial
Services
Property Services 303 337 34 10.1% 861 861 0 0.0% The YTD underspend is due to
vacancies within Property Services. 
Page 34

Page 35

Head of
Commercial
Services
Shared Offices 219 317 98 30.9% 1,634 1,634 0 0.0% The YTD underspend is due to
profiling of CRA and rental income
budgets. 
2,095 2,109 14 0.7% 10,448 10,448 0 0.0%  
Head of
Education
Additional Support
for Learning
2,737 2,641 (96) (3.6%) 11,788 11,788 0 0.0% The YTD overspend is largely within
ASN Assistants and this will be
remedied through a drawdown from
Earmarked Reserves in July.
Head of
Education
Central/Management
Costs
747 296 (451) (152.4%) 1,899 1,899 0 0.0% The YTD overspend is largely due to
profiling of central teaching staff
budgets which have been profiled
into March in error. This will be
corrected in July. 
Head of
Education
Community Learning
& Development
2 1 (1) (100.0%) 15 15 0 0.0% The YTD overspend is due to utilities
costs within CLD premises for which
budgets will be rightsized throughout
the year. 
Head of
Education
COVID 15 0 (15) n/a 0 0 0 0.0% The YTD overspend will be rectified
through drawdown of earmarkings. 
Head of
Education
Early Learning &
Childcare
3,250 3,715 465 12.5% 17,495 17,495 0 0.0% The YTD underspend is largely due
to accruals still to be recharged
relating to ELC upgrade works at
Rothesay Joint Campus and budget
profiling within ELC Settings and
Central ELC budgets. This is
partially offset by a YTD overspend
in 1140 which will be remedied
through a drawdown from
Earmarked Reserves in July.
Head of
Education
Primary Education 9,602 9,664 62 0.6% 40,496 40,496 0 0.0% The YTD underspend relates to
profiling of budgets within schools
for NPDO Facilities Management
recharges which have not yet been
recharged for the current year,
partially offset by profiling of Pupil
Equity Fund grant and school meal
income budgets.  
Page 35

Page 36

Head of
Education
Pupil Support 525 458 (67) (14.6%) 2,419 2,419 0 0.0% The YTD overspend is due to higher
than budgeted demand for Schools
Residential Placements. This will be
monitored closely throughout the
year. There is also an overspend in
the Wellbeing budget and this will be
remedied through a drawdown from
Earmarked Reserves in July.
Head of
Education
Schools - Central
Services
579 603 24 4.0% 2,376 2,376 0 0.0% Outwith Reporting Criteria
Head of
Education
Secondary
Education
8,847 9,163 316 3.5% 37,264 37,264 0 0.0% The YTD underspend relates to
profiling of budgets within schools
for NPDO Facilities Management
recharges which have not yet been
recharged for the current year,
partially offset by profiling of Pupil
Equity Fund grant and school meal
income budgets.      
26,304 26,541 237 0.9% 113,752 113,752 0 0.0%  
Head of Legal &
Regulatory
Support
Central/Management
Costs
56 52 (4) (7.7%) 264 264 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Community Safety 106 37 (69) (186.5%) 168 168 0 0.0% The YTD overspend will be partially
rectified through drawdown of
earmarkings and processing of
prepayments at year end. 
Head of Legal &
Regulatory
Support
Elections 32 31 (1) (3.2%) 37 37 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Governance 83 63 (20) (31.8%) 731 731 0 0.0% The YTD overspend will be partially
rectified through drawdown of
earmarkings and processing of
prepayments at year end. 
Head of Legal &
Regulatory
Support
Governance, Risk &
Safety
125 116 (9) (7.8%) 554 554 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Legal Services 35 81 46 56.8% 701 701 0 0.0% The YTD underspend is due to
timing of licensing income. 
Page 36

Page 37

Head of Legal &
Regulatory
Support
NPDO and Hub
Schools
5,873 5,946 73 1.2% 17,111 17,111 0 0.0% The YTD underspend is due to the
profiling of budget for third party
payments. 
Head of Legal &
Regulatory
Support
Procurement,
Commercial and
Contract
Management
227 227 0 0.0% 1,160 1,160 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Trading Standards &
Advice Services
153 128 (25) (19.5%) 610 610 0 0.0% The YTD overspend will be partially
rectified through drawdown of
earmarkings and re-profiling of grant
income budgets. 
6,690 6,681 (9) (0.1%) 21,336 21,336 0 0.0%      
35,169 35,417 248 0.7% 145,610 145,610 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.  
Page 37

Page 38

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – SUBJECTIVE SUMMARY AS AT 30 JUNE 2024  
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 24,439 24,038 (401) (1.7%) 106,732 106,732 0 0.0% The YTD overspend is largely due to profiling of central
teaching staff budgets which have been profiled in to
March in error. Budget adjustments relating to new
year grant awards also require to be input to offset
variances. 
Premises 1,434 1,877 443 23.6% 8,480 8,480 0 0.0% The YTD underspend is largely due to accruals still to
be recharged relating to ELC upgrade works at
Rothesay Joint Campus as well as profiling of CRA
budgets across all Services. 
Supplies and
Services
3,058 3,183 125 3.9% 13,690 13,690 0 0.0% The YTD underspend relates to profiling of Pupil Equity
Fund budgets and timing of recharges for school meals
for the June period. 
Transport 100 84 (16) (19.1%) 333 333 0 0.0% The YTD overspend is due to small overspends within
staff travel budgets across all Services, which are likely
to be offset by underspends elsewhere. 
Third Party 9,069 9,815 746 7.6% 46,521 46,521 0 0.0% The YTD underspend relates to profiling of budgets
within schools for NPDO Facilities Management
recharges which have not yet been recharged for the
current year. 
Income (2,931) (3,580) (649) 18.1% (30,146) (30,146) 0 0.0% The YTD overspend relates to the profiling of Pupil
Equity Fund grant and school meal income budgets.  
Totals 35,169 35,417 248 0.7% 145,610 145,610 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%. 
Page 38

Page 39

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – RED VARIANCES AS AT 30 JUNE 2024
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation                        
A red variance is a forecast variance which is greater than +/- £50,000.
Page 39

Page 40

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – AS AT 30 JUNE 2024 
The department has a forecast overspend of £0.500m (0.9%). This is due to the cost of new Bus Contracts for Public and Pupil Transport
across Argyll and Bute.  Since the end of June a further pressure of £0.210m in relation to bus contracts has been identified as more contracts
are renewed therefore in the next reporting period the forecast overspend relating to bus contracts will increase from £0.500m to £0.710m. 
There is also further potential overspends relating to repairs to the Belnahua Ferry (£0.250m) and TRO Income (£0.100m) which was a
previously agreed saving to secure additional income that has been unachievable that have been highlighted since the end of June.  This will
take the departmental overspend to £1.060m. 
A separate report in relation to the October 2023 Weather Event is on the agenda and provides members with an update on the various flood
sites, estimated overspends and proposed range of measures for Members to consider which could be used to cover the estimated
overspends.  The projected revenue overspend of £3.567m is presented within the Corporate Overview. 
The department has a year to date overspend of £3.767m (29.6%).  This is mainly due to an outstanding accrual from Scottish Government for
the Bellwin Claim as well as the profile of a number of budgets across the department.  
Forecast Outturn Position 
Service Annual
Budget 
£000
Forecast
Outturn 
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change 
£000
Executive Director
(Kirsty Flanagan) (271) (271) 0 0 0
Head of Customer
Support Services
8,793 8,793 0 0 0
Head of
Development and
Economic Growth 7,785 7,785 0 0 0
Head of Financial
Services 6,756 6,756 0 0 0
Head of Roads
and Infrastructure
Services 33,018 33,518 (500) 0 (500)
Totals 56,081 56,581 (500) 0 (500) 
Year to Date Position 
0%
25%
50%
75%
100%
Executive
Director
(Kirsty
Flanagan)
Head of
Customer
Support
Services
Head of
Development
and
Economic
Growth
Head of
Financial
Services
Head of
Roads and
Infrastructure
Services
Expenditure to date against the remaining budget for
each Service
YTD
Actual
£000
Remaining Budget
£000
Page 40

Page 41

Key Financial Successes:
The department had a challenging 2023-24 financial year with few financial successes largely due to the Weather Incident in October creating
substantial pressures as well as reduced income due to numerous ferry cancellations at our Piers & Harbours. 
Key Financial Challenges: Proposed Actions to address Financial Challenges:
Ensuring that services spend to budget and do not overspend after the
department had an overspend of £1.3m after automatic earmarkings in
2023-24.
Detailed monitoring in the key areas overspent in 2023-24 to flag up
concerns early and mitigate before becoming an overspend. 
Department / Service ongoing ability to meet future savings / efficiency
requirements.
Monitoring of trends / expenditure levels / service configuration and
the Service Packages Policy Options savings process.
Rising cost of materials, software and consultancy services across the
service will result in a reduction in activity or overspends.
Costs are monitored regularly and contained as much as possible
with any unavoidable overspends highlighted as soon as known.
Financial Services to continue to deliver a high-quality support service
function during a time of substantial uncertainty and challenge arising from
continuing reductions in funding whilst costs are increasing due to ongoing
high levels of inflation and service demand caused by world events.
Ensure the team is operating as efficiently and effectively as
possible by building resilience across the team and working
collaboratively with other services of the Council to support
evidence-based decision making. 
Winter Maintenance costs are difficult to estimate as they are very much
dependant on the weather.  
Close monitoring of Winter Maintenance activity and reporting of the
financial implications through the budget monitoring process. The
Council agreed the winter policy, setting out the intervention level
and locations to be treated.  The number of treatments is determined
by weather conditions. The current budget provision provides for 56
full equivalent runs. There is a sophisticated weather monitoring
system in place consisting of several weather stations, this is
supported by a forecasting and meteorological service which is
collaboratively procured by West of Scotland local authorities.
Climate Change Mitigation impacting on the departments key
infrastructure due to increased inspection regimes will result in
overspends.
The Council will continue to tackle climate change, looking at
financially sustainable options and will closely monitor the financial
consequences.
Dangerous buildings costs as there is no budget for this expenditure and
the council has no control over the demand for the service.
Building Standards, Legal Services and Financial Services are
working closely to manage debt recovery and to consider other
options to minimise corporate risk exposure. 
Page 41

Page 42

Ferry Grant from Transport Scotland has stayed the same for 2024-25
despite increased costs for employee inflation as well as other general
inflationary increases.
Costs are monitored regularly and contained as much as possible
with any unavoidable overspends highlighted as soon as known.
Due to the nature of the various components of Waste Management there
are ongoing challenges with:
• The introduction of the Deposit Return Scheme
• Uncertainty with recycling income/ gate fee costs due to the           
volatility of the market
• Challenges in the legislative changes around the disposal of      
Biodegradable Municipal Waste
• The Circular Economy Bill that has recently been passed  and the
implications that may bring 
To closely monitor all service components of Waste Management
and review the Waste Strategy in conjunction with our contractual
partner Renewi (previously Shanks). 
Page 42

Page 43

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 30 JUNE 2024
Service
Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director (Kirsty
Flanagan)
Central/Management
Costs
63 63 0 0.0% (271) (271) 0 0.0% Outwith Reporting Criteria    
63 63 0 0.0% (271) (271) 0 0.0%  
Head of
Customer
Support Services
Central/Management
Costs
29 30 1 3.3% 167 167 0 0.0% Outwith Reporting Criteria
Head of
Customer
Support Services
Communications 67 64 (3) (4.7%) 312 312 0 0.0% Outwith Reporting Criteria
Head of
Customer
Support Services
Customer Service
Centres
272 298 26 8.7% 1,616 1,616 0 0.0% Outwith Reporting Criteria
Head of
Customer
Support Services
HR 624 587 (37) (6.3%) 2,370 2,370 0 0.0% Outwith Reporting Criteria
Head of
Customer
Support Services
ICT 1,294 1,260 (34) (2.7%) 4,345 4,345 0 0.0% Outwith Reporting Criteria
Head of
Customer
Support Services
Registrars (32) (20) 12 (60.0%) (17) (17) 0 0.0% YTD variance due to over-
recovery of income received for
marriages due to increased
activity over summer months    
2,254 2,219 (35) (1.6%) 8,793 8,793 0 0.0%  
Head of
Development &
Economic Growth
Airports 343 268 (75) (28.0%) 1,186 1,186 0 0.0% YTD variance due to profile of
budget for Private Contactors
which will be rectified over the
coming months
Head of
Development &
Economic Growth
Building Control (110) (80) 30 (37.5%) (113) (113) 0 0.0% YTD variance due to over-
recovery of Building Warrant
income received
Head of
Development &
Economic Growth
Central/Management
Costs
122 129 7 5.4% 572 572 0 0.0% Outwith Reporting Criteria
Page 43

Page 44

Head of
Development &
Economic Growth
Culture & Heritage 34 51 17 33.3% 225 225 0 0.0% YTD variance due to profile of
Rothesay Pavilion which will be
rectified over the coming months
Head of
Development &
Economic Growth
Development
Management
126 (52) (178) 342.3% 114 114 0 0.0% YTD variance due to under-
recovery of Planning Fee
income received
Head of
Development &
Economic Growth
Development Policy 79 98 19 19.4% 475 475 0 0.0% YTD variance due to profile of
budget for third party payments
which will be rectified over the
coming months
Head of
Development &
Economic Growth
Economic
Development
318 299 (19) (6.4%) 1,032 1,032 0 0.0% Outwith Reporting Criteria
Head of
Development &
Economic Growth
Environmental
Health
204 250 46 18.4% 1,268 1,268 0 0.0% YTD variance is due to timing of
Private Landlord Registration
income which will be rectified
over the coming months.
Head of
Development &
Economic Growth
Environmental
Initiatives
13 13 0 0.0% 104 104 0 0.0% Outwith Reporting Criteria
Head of
Development &
Economic Growth
Housing 1,577 948 (629) (66.4%) 2,695 2,695 0 0.0% YTD variance due to timing of
grant claim for HEEPS with
expenditure incurred in advance
of income being received
Head of
Development &
Economic Growth
Private Landlords (351) (9) 342 (3800.0%) 0 0 0 0.0% YTD variance is due to timing of
Short Term Let income which
will be rectified over the coming
months.
Head of
Development &
Economic Growth
Transportation
Policy
449 50 (399) (798.0%) 227 227 0 0.0% YTD variance due to timing of
grant claim for CWSS with
expenditure incurred in advance
of income being received    
2,804 1,965 (839) (42.7%) 7,785 7,785 0 0.0%  
Head of Financial
Services
Accounting &
Budgeting
508 566 58 10.3% 2,559 2,559 0 0.0% YTD underspend due to the
timing of cash flows in
comparison to the profiling of
budget and will be rectified over
the financial year. 
Head of Financial
Services
Internal Audit &
Fraud
64 73 9 12.3% 332 332 0 0.0% YTD underspend caused by
slippage on a vacant post.
Page 44

Page 45

Head of Financial
Services
Revenues & Benefits 738 855 117 13.7% 3,063 3,063 0 0.0% YTD underspend due to the
timing of cash flows in
comparison to the profiling of
budget and will be rectified over
the financial year. 
Head of Financial
Services
Scottish Welfare
Fund
232 159 (73) (45.9%) 802 802 0 0.0% Earmarkings requiring to be
drawn down against overspends
- this will be rectified in next
reporting period.    
1,542 1,653 111 6.7% 6,756 6,756 0 0.0%  
Head of Roads &
Infrastructure
Services
Amenity 990 802 (188) (23.4%) 3,146 3,146 0 0.0% YTD variance mainly due to
delay in Interment Fees in
Cemeteries and budget profile of
internal recharges within Public
Conveniences
Head of Roads &
Infrastructure
Services
Car Parking (70) (168) (98) 58.3% (590) (590) 0 0.0% YTD variance due to delay in
receiving income for Electric
Vehicle usage
Head of Roads &
Infrastructure
Services
Central/Management
Costs
699 636 (63) (9.9%) 2,764 2,764 0 0.0% YTD  variance due to profile of
internal recharge budget which
will be rectified for future
monitoring
Head of Roads &
Infrastructure
Services
Depots 92 (103) (195) 189.3% (313) (313) 0 0.0% YTD  variance due to profile of
internal recharge budget which
will be rectified for future
monitoring
Head of Roads &
Infrastructure
Services
Fleet & Transport 2,603 2,167 (436) (20.1%) 8,724 9,224 (500) (5.7%) YTD variance due to internal
fleet maintenance costs and
increased bus contracts for
Public Transport and Pupil
Transport.
Forecast overspend reported
due to increased contract costs
for Public Transport.  This will
increase to £710k in next
reporting period as further
contracts are in the process of
being renewed with increased
costs.
Page 45

Page 46

Head of Roads &
Infrastructure
Services
Infrastructure (7) 138 145 105.1% 725 725 0 0.0% YTD variance due to outstanding
accruals within Coastal
Protection
Head of Roads &
Infrastructure
Services
Marine 32 (629) (661) 105.1% (3,866) (3,866) 0 0.0% YTD variance due to timing of
Piers & Harbours income
alongside additional costs due to
Ferry maintenance
Head of Roads &
Infrastructure
Services
Network & Traffic
Management
42 5 (37) (740.0%) 154 154 0 0.0% YTD variance due to shortfall in
income for Traffic Regulation
Orders
Head of Roads &
Infrastructure
Services
Road Safety 24 26 2 7.7% 131 131 0 0.0% Outwith Reporting Criteria
Head of Roads &
Infrastructure
Services
Roads & Lighting 4,174 1,587 (2,587) (163.0%) 7,481 7,481 0 0.0% YTD variance due to outstanding
accruals from Scottish
Government for Bellwin Claim
alongside profile of internal
recharge budget within the
Roads and Lighting Holding
account.
Head of Roads &
Infrastructure
Services
Waste 1,242 2,356 1,114 47.3% 14,662 14,662 0 0.0% YTD variance mainly due to the
profile of the Waste PPP
contract payments which will be
rectified over coming months    
9,821 6,817 (3,004) (44.1%) 33,018 33,518 (500) (1.5%)      
16,484 12,717 (3,767) (29.6%) 56,081 56,581 (500) (0.9%)   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 46

Page 47

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – SUBJECTIVE SUMMARY AS AT 30 JUNE 2024
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 8,654 8,772 118 1.4% 42,988 42,988 0 0.0% YTD variance mainly due to vacancies within the Roads and
Lighting Holding Account which are being covered by
external contractors
Premises 719 864 145 16.8% 3,624 3,624 0 0.0% YTD variance mainly due to the profile of the Depot internal
recharges which will be profiled to rectify for next monitoring
period.
Supplies
and
Services
3,373 2,620 (753) (28.7%) 9,139 9,139 0 0.0% YTD variance mainly due to purchase of materials within
Roads which will be offset against additional income over the
coming months, alongside payments made against UK
Shared Prosperity Fund which will be offset with grant
income once received
Transport 3,862 2,835 (1,027) (36.2%) 16,401 16,401 0 0.0% YTD variance due to internal fleet and ferry maintenance
costs.
Third Party 16,093 15,584 (509) (3.3%) 64,771 65,271 (500) (0.8%) YTD variance mainly due to grant payments within Economic
Development and Transportation that either have or will be
offset with grant income once received as well as an
overspend on public transport and the profile of budgets
across a number of cost centres.
Capital
Financing
0 0 0 0.0% 2,677 2,677 0 0.0% Outwith Reporting Criteria
Income (16,217) (17,958) (1,741) 9.7% (83,519) (83,519) 0 0.0% YTD variance mainly due to profile of income recharges
within the Roads Operational Holding Account which is
partially offset with grant income received within Economic
Development to cover expenditure incurred within Third party
Payments
Totals 16,484 12,717 (3,767) (29.6%) 56,081 56,581 (500) (0.9%)   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 47

Page 48

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – RED VARIANCES AS AT 30 JUNE 2024 
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Public Transport 5,266 5,766 (500) (9.5%)
New bus contracts in place for Public and Pupil Transport.  This will
increase to £710k in next reporting period as further contracts are in the
process of being renewed with increased costs. 
A red variance is a forecast variance which is greater than +/- £50,000.
Page 48

Page 49

SOCIAL WORK – AS AT 30 JUNE 2024 
The department is currently forecasting an overspend of £0.648m (0.8%). This is due to demand for residential placements within Children and
Families Services.   
The department has a year-to-date overspend of £0.081m (0.2%) which again is due to demand driven services within Children and Families.   
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Chief Officer Integration (3,470) (3,490) 20 0 20
Head of Strategic Planning
and Performance 480 478 2 0 2
Head of Health and
Community Care 43,455 43,558 (103) 0 (103)
Head of Acute and
Complex Care 21,427 21,074 353 0 353
Head of Children and
Families 16,574 17,494 (920) 0 (920)
Totals 78,466 79,114 (648) 0 (648)
Year to Date Position 
Key Financial Successes: 
Delivered a balanced budget at the end of 2023/24 after utilising £1.826m of reserves. An additional amount of £0.209m was transferred to IJB
reserves and should allow for future investment and transformation across Social Work. 
-115%
-90%
-65%
-40%
-15%
10%
35%
60%
85%
110%
Chief Officer
Integration
Head of Adult
Services
Head of Children
and Families
Head of Strategic
Planning and
Performance
Expenditure to date against the remaining budget for each
Service
YTD
Actual
£000
Remaining Budget
£000
Page 49

Page 50

Key Financial Challenges: Proposed Actions to address Financial Challenges:
Deliver the outstanding savings total for 2024/25 of £1.132m (as at June
2024).
Maintain a close working relationship with the HSCP Service
Improvement Team to quickly and efficiently identify and assess
options for delivering the outstanding savings. 
Development and delivery of future service redesigns which will be
necessary to contain service expenditure within the allocated resource,
noting that in year savings still need to be identified for 24/25 to address
the 24/25 budget gap, as well as budget gaps in future years. 
Support from finance to assist strategic managers to develop and
identify further savings and to look beyond the short term to identify
and plan the changes which will be needed to address the expected
ongoing budget challenges over the current, and future, years.
Use of agency staff to support service delivery across Social Work, but
particularly in Older People services, due to recruitment and retention
challenges within the service. Year to date spend at June 2024 of
£0.996m. 
Close working relationship with the HSCP to support the costing of
a plan to stabilise the service and ensure it is operationally and
financially sustainable. This includes an exit plan from the reliance
on agency staff. 
Cost of living crisis affecting pay inflation negotiations and financial
sustainability of service providers, which could affect affordability and
sustainability of service delivery. 
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be evaluated and reported through the
budget monitoring and preparation processes.  Page 50

Page 51

SOCIAL WORK – OBJECTIVE SUMMARY AS AT 30 JUNE 2024
Service Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Officer
Integration
Integration
Headquarters
152 117 (35) (29.9%) 596 593 3 0.5% The YTD variance is due to front loaded
payments relating to the purchase of
computer software. The forecast variance is
outwith reporting criteria.
Chief Officer
Integration
Social Work
Central
Support
(548) (545) 3 (0.6%) (4,066) (4,083) 17 (0.4%) The YTD variance is outwith the reporting
criteria however the annual budget and
forecast outturn are currently showing as
negative due to budget drawdowns waiting to
be actioned.  These will be processed during
July.    
(396) (428) (32) (30.5%) (3,470) (3,490) 20 0.1%  
Head of
Strategic
Planning &
Performance
Management
& Central
Costs
86 87 1 1.2% 448 448 0 0.0% The YTD and forecast variances are outwith
the reporting criteria.
Head of
Strategic
Planning &
Performance
Service
Development
9 5 (4) (80.0%) 32 30 2 6.3% The YTD variance is due to timing differences
on charges to health boards. The forecast
variance is outwith the reporting criteria.    
95 92 (3) (78.9%) 480 478 2 6.3%  
Head of
Health and
Community
Care
Management
& Central
Costs
72 45 (27) (60.0%) 582 594 (12) (2.1%) The YTD variance is due to timing differences
on the charges to health boards.  The
forecast variance is outwith reporting criteria.
Head of
Health and
Community
Care
Older People 1,680 1,783 103 5.8% 42,873 42,964 (91) (0.2%) The YTD and forecast variance are both due
to known commitments on Carefirst.    
1,752 1,828 76 4.2% 43,455 43,558 (103) (0.2%)  
Head of
Acute and
Complex
Care
Learning
Disabilities
(2,078) (1,981) 97 (4.9%) 15,128 14,816 312 2.1% The YTD variance is due to timing differences
on charges to health boards and other income
lines. The forecast underspend is based on
current known commitments on Carefirst.
Head of
Acute and
Complex
Care
Management
& Central
Costs
16 29 13 44.8% 128 115 13 10.2% The YTD and forecast underspend are based
on current projected training costs and
supplies and services costs which could
improve as spend trend becomes clearer.
Page 51

Page 52

Head of
Acute and
Complex
Care
Mental Health (210) (264) (54) 20.5% 3,063 3,395 (332) (10.8%) The YTD variance is due to known
commitments. The forecast overspend is
based on current known commitments on
Carefirst.
Head of
Acute and
Complex
Care
Physical
Disability
212 268 56 20.9% 3,108 2,748 360 11.6% The YTD variance is due to known
commitments. The forecast underspend is
based on current known commitments on
Carefirst.    
(2,060) (1,948) 112 81.3% 21,427 21,074 353 13.0%  
Head of
Children &
Families
Child
Protection
620 692 72 10.4% 3,619 3,522 97 2.7% The YTD variance is based on known
commitments and some deferred income
received from previous years. The forecast
underspend is as a result of demand for
contact and welfare services and deferred
income in the area teams budget lines.
Head of
Children &
Families
Children with
a Disability
274 245 (29) (11.8%) 1,065 1,077 (12) (1.1%) The YTD variance is based on known
commitments. The forecast variance is
outwith reporting criteria.
Head of
Children &
Families
Criminal
Justice
117 3 (114) (3800.0%) 174 165 9 5.2% The YTD variance is due to timing of grant
income. The forecast variance is outwith
reporting criteria.
Head of
Children &
Families
Looked After
Children
1,844 1,628 (216) (13.3%) 7,938 8,938 (1,000) (12.6%) The YTD variance is due to an increase in the
demand in the number of residential
placements. The forecast overspend relates
to childrens external residential placements. 
We currently have 16 children in placements
with a potential 6 other children being
considered.  This overspend is unlikely to
improve as we progress through the financial
year.
Head of
Children &
Families
Management
& Central
Costs
615 668 53 7.9% 3,778 3,792 (14) (0.4%) The YTD variance is due to increased s12
payments. The forecast variance is outwith
reporting criteria.    
3,470 3,236 (234) (7.2%) 16,574 17,494 (920) (5.6%)  
GRAND
TOTAL   2,861 2,780 (81) (2.9%) 78,466 79,114 (648) (0.8%)   
Page 52

Page 53

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.  
Page 53

Page 54

SOCIAL WORK – SUBJECTIVE SUMMARY AS AT 30 JUNE 2024 
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 7,613 7,177 (436) (6.1%) 34,715 35,120 (405) (1.2%) Both the YTD and forecast overspend is due
to the use of agency staff across the HSCP
partially offset by payroll underspends due to
vacancies. 
Premises 471 522 51 9.8% 1,701 1,668 33 1.9% The YTD underspend is largely due to
budget profiling and the forecast underspend
is outwith the reporting criteria.
Supplies &
Services
470 421 (49) (11.6%) (661) (473) (188) 28.4% The YTD overspend is largely due to the
timing of payments relating to the purchase
of computer software and the forecast
budget and outturn variances are due to the
profiling of savings options not yet achieved.
Transport 143 144 1 0.7% 619 618 1 0.2% The YTD variance is outwith reporting
criteria.
Third Party 11,321 11,306 (15) (0.1%) 66,469 67,917 (1,448) (2.2%) The YTD variance is outwith reporting
criteria. The forecast overspend is due to
demand for purchased care services across
both Childrens and Adult Services.
Income (17,157) (16,790) 367 (2.2%) (24,377) (25,736) 1,359 (5.6%) The YTD and forecast over recovery of
income is mainly due to increased income
from fees, charges and recharges.
Totals 2,861 2,780 (81) (2.9%) 78,466 79,114 (648) (0.8%)   
Page 54

Page 55

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.
Page 55

Page 56

SOCIAL WORK – RED VARIANCES AS AT 30 JUNE 2024
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Looked After
Children 7,950 8,950 (1,000) (12.6%)
The forecast overspend relates to childrens external residential placements.  We currently have 16
children in placements with a potential 6 other children being considered.  This overspend is unlikely
to improve as we progress through the financial year.
Child Protection 3,620 3,523 97 2.7% The forecast underspend is as a result of demand for contact and welfare services and deferred
income in the area teams budget lines.
Older People -
Homecare 19,989 19,487 502 2.5% The forecast underspend is based on current known commitment from CareFirst system. 
Older People -
Internal
Residential
7,622 6,970 652 8.6% The forecast underspend is due to over-recovery of income. 
Older People -
External
Residential
12,385 13,483 (1,098) (8.9%) The forecast overspend reflects demand for service based on known package commitments.
Older People -
Other 9,690 9,837 (147) (1.5%) The forecast underspend is due to an over recovery of income. 
Physical Disability 3,862 3,502 360 9.3% The forecast underspend is based on current known commitments on Carefirst.
Learning Disability 20,424 20,112 312 1.5% The forecast underspend is based on current known commitments on Carefirst.
Mental Health 3,954 4,301 (347) (8.8%) The forecast overspend is based on current known commitments on Carefirst. 
A red variance is a forecast variance which is greater than +/- £50,000. 
Page 56

Page 57

MONITORING OF SAVINGS – AS AT 30 JUNE 2024
New policy savings were identified for the three year period 2024-25 to 2026-27 and these were agreed by Council in February 2024.  Council
agreed to policy savings of £0.665m on a recurring basis. 
The position of historical policy saving options is as follows:
- 2023/24 – those not delivered or that have further increases in value in 2024-25 onwards total £5.387m
- 2022/23 – those not delivered or that have further increases in value in 2024-25 onwards total £0.170m
- 2021/22 – those not delivered total £0.041m
- 2020/21 – all delivered
- 2019/20 – all delivered
- 2018/19 - those not delivered total £0.204m
The 2024-25 savings have been removed from departmental budgets, however, it is important to monitor whether the saving has actually been
delivered to ensure that costs are not continuing resulting in an overspend by the end of the year.  It is also important to ensure that any
preparatory work required to deliver savings in future years is on track. 
There is one saving where the department has indicated it will not be achieved in full and one saving categorised as having a potential shortfall,
as summarised below:
Saving Saving
Agreed
Status Detail Shortfall/
Delayed
Value
TB13b Roads and
Amenity Services
charging (non-statutory
services)
Feb-18 Will not be achieved in
full.
The original proposal was to introduce charges for providing lighting
design and increase charges by 20% for road construction consents,
skips, scaffolds, hoarding, permits and licences. Whilst some
additional income has been generated through third party works,
opportunities are expected to be limited over the foreseeable future
due to staff shortages and other competing demands.   
A cost pressure will be added to the 2025-26 budget for this shortfall
and the service will look at other potential savings as part of the RIS
Review.
£100,000
Page 57

Page 58

TB12b Stadiums Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
Discussions had stalled with partners in the Oban and Lorn area with
regard to Mossfield stadium to create a sports Hub, attract external
funding to improve facilities and therefore attract additional events to
the arena.  The users group has now reconvened and will be
reporting to the steering group. It should be noted there is generally a
downturn in usage of pitches partly due to more clubs booking all
weather pitches at high schools and the loss of a well-established
club disbanding which will result in the loss of income. The Mossfield
Sport Group have highlighted that certain clubs along with the Shinty
Associations have expressed concerns with regards to the condition
of the Pavilion and changing facilities and this is likely to impact on
income.  East King Street bookings have reduced due to the
condition of the changing facilities and clubs having to play their
fixtures elsewhere.
£30,000 
All policy saving options previously agreed are noted in the table below for information. 
Page 58

Page 59

2024-25 2024-25
£000 FTE
Executive Director Douglas Hendry
CS01 Feb-22 Commercial
Services
Property Services Climate Change & Resource Efficiency 63.0 0.00 On Track to be Delivered
202425 008 Feb-24 Commercial
Services - Live
Argyll
Live Argyll 10%
reduction
10% reduction to the Management Fee
paid to Live Argyll Leisure Trust from the
Council.
363.00 0.0 Delivered
202425 011 Feb-24 Education Positive Starts Referrals to the Positive Starts support
scheme have been reducing year on year,
furthermore the Early Years team no
longer have capacity to quality assure and
administer this budget to a level where
they can ensure a positive impact for
children and families or best value in
relation to the service. Referrals come
form Health and Social Work, not
Education however the HSCP were not
willing to manage this budget.
40.0 0.00 Delivered
202425 009 Feb-24 Governance,
Risk and
Safety
Governance
Restructure
Reorganisation of Governance team and
remove posts that are currently vacant.
The proposed restructure will ensure
current level of service will be maintained.
62.00 2.5 On Track to be Delivered
Executive Director Kirsty Flanagan
DEG01 Feb-22 Development
and Economic
Growth
Economic Growth Crown Estate Administration Contribution
to Project Delivery
107.00 0.0 Delivered
FIS2324-001 Feb-23 Financial
Services
Treasury
Management
Service Concessions - Alteration to
accounting treatment to align the
repayment of borrowing relating to new
schools over their asset life.  Guidance
from Scottish Government now permits
this change of accounting treatment. 
Further detail will be provided to Council in
due course.
4,861.0 0.00 Delivered
FIS2324-002 Feb-23 Financial
Services
Revenues and
Benefits
The Service has identified savings
through rightsizing of budgets, an
organisational restructure with investment
in modern apprenticeships and temporary
staff designed to boost income from the
billing of additional local taxes and the
recovery of associated debt. In addition
efficiency savings from increased
productivity, increased levels of process
automation and moving more customers
to transact with the service over the
internet will allow previously outsourced
review works to be carried out internally.
466.00 3.0 On Track to be Delivered
R&I15 Feb-21 Roads and
Infrastructure
Roads and
Infrastructure
Emergency services support and fuel
provision from our fuel supplies
0.50 0.0 Still to be Implemented
202425 012 Feb-24 Roads and
Infrastructure
Roads and
Infrastructure
Services (RIS)
Review
A RIS Review was undertaken during
2023/24 and the implementation of the
outcomes will begin in 2024-25. It is
anticipated that further efficiency savings
will be achievable in future years but the
level of which are not known at this stage.
200.00 0.0 On Track to be Delivered
R&I09 Feb-21 Roads and
Infrastructure -
Operations
Roads and
Infrastructure -
Operations
Road inspections find and fix -  reduce
reactive work by proactivity. Moving to AI
technology as technology develops
40.00 1.0 On Track to be Delivered
RIS2324-001 Feb-23 Roads and
Infrastructure
Services
School Crossing
Patrollers
Support Communities to move to different
approaches to delivering School Crossing
Patrols through engagement with Parent
Council and Communities.
60.00 8.4 On Track to be Delivered
TB13b Feb-18 Roads and
Infrastructure
Services
Roads and
Infrastructure
Services
Roads & Amenity Services charging (non-
statutory services)
100.0 0.00 Will not be achieved
TB13b Feb-18 Roads and
Infrastructure
Services
Roads and
Infrastructure
Services
Roads & Amenity Services charging (non-
statutory services)
50.0 0.00 On Track to be Delivered
TB12b Feb-18 Roads and
Infrastructure
Services
Amenity Services Review charges for stadiums to enable
improvement work
30.00 0.0 Potential Shortfall
TB09 Feb-18 Roads and
Infrastructure
Services
Public Conveniences Public Conveniences - Progress
sustainable models including turnstiles
and franchising; establish simpler asset
transfer process
24.00 0.0 On Track to be Delivered
TOTAL 6,466.5 14.9
Template Ref Saving
Agreed
Service Service Delivery
Area
Savings Option Status of Implementation
Page 59

Page 60

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE 
15 AUGUST 2024
FINANCIAL RISKS ANALYSIS 2024-25  
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to provide a summary of the key financial risks
facing the Council.   
1.2  A number of Council wide risks, both revenue and capital, have been identified
along with risks for each department and service of the Council.  For each
departmental risk the financial impact has been quantified and the likelihood
assessed based on the standard risk matrix. 
1.3 There are 7 Council wide revenue risks identified for 2024-25 currently amounting
to £3.592m. 
1.4 There are currently 42 departmental risks totalling £5.580m.  Of the 42
departmental risks, 5 are categorised as likely.   
1.5 The financial risks are monitored routinely and actions put in place to continue to
mitigate the risks.   
Page 60

Page 61

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE 
15 AUGUST 2024
FINANCIAL RISKS ANALYSIS 2024-25  
2. INTRODUCTION 
2.1 This report outlines the process and approach developed in carrying out a
financial risks analysis and provides a note of the current assessment of financial
risks for 2024-25. 
3 DETAIL 
3.1 Introduction 
3.1.1 The Council is currently in a period of significant financial challenge.  In
developing its budget to address both restricted resources and cost and demand
pressures there are a number of financial risks the Council needs to consider and
manage. 
3.1.2 There are a number of risks that affect the income or expenditure across the
whole council and these have been identified.  Financial risks have been
considered by each department and service of the Council.   
3.1.3 For each risk, the financial impact has been quantified and the likelihood
assessed based on the standard risk matrix as follows: 
1 – Remote
2 – Unlikely
3 – Possible
4 – Likely
5 – Almost Certain 
3.1.4 The Argyll and Bute Integrated Joint Board (IJB) with responsibility for Social
Work and a range of Health services was established and came into effect on 1
April 2016.  The IJB is responsible for financial and strategic oversight of these
services.  It is the responsibility of the IJB to consider the individual financial risks
associated with Integration Services and they are therefore not contained within
this report.  A Council wide risk has been included in respect of the IJB being
unable to deliver the social care service within the budget allocated. 
3.2 Council Wide Risks 
Revenue  
3.2.1 The 2024-25 budget includes a 3% pay award assumption for all staff groups. 
Negotiations on the 2024-25 award are in progress and it is likely that the Trade
Unions will looking to negotiate a deal at more than 3%.  However, the
Page 61

Page 62

affordability for Local Government has to be considered and based on future
estimates, anything above a 3% pay award is deemed to be unaffordable, hence
why the budget outlook has been based on 3%.  This is a situation that will be
kept under close review as the pay negotiations advance during the year and the
assumption will be adjusted as required.  For each 1% more than the 3% built in,
there would be an additional cost of around £1.264m.  The financial risk is
recognised at £1.264m at this stage. Note that this is for SJC, Chief Officer and
Teaching Staff.  A risk in relation to Councillor pay is noted at section 3.2.4. 
3.2.2 Utility costs remain a volatile area and it is difficult to accurately predict how the
prices could vary.  With the volatility of utilities pricing it is very difficult to predict
the impact going forward but a financial risk based on a 10% variation on the
2023-24 actual spend plus 2024-25 non-pay inflation is £0.650m. 
3.2.3  The estimated level of council tax income is based on current and forecast Band
D equivalents and non-payment rates.  This reflects our most recent experience in
terms of the council tax base and likely collection rates.  A 1% variation in council
tax income amounts to approximately £0.633m. 
3.2.4 The Scottish Local Authorities Remuneration Committee (SLARC) have been
working on proposals in relation to Councillor Remuneration which would result in
increases to Councillor pay and a budget pressure of £0.178m for Argyll and Bute
if backdated to 1 April 2024.  The Scottish Government have indicated that they
would be open to agreeing the changes with an implementation date of 1 April
2025 but a recent COSLA Leaders update advised that a regulatory pathway
remains open for an uplift to be backdated to April 2024 subject to local
government funding. COSLA will continue to work with the Scottish Government
over the summer and a full paper will be taken to the COSLA Leadership
Sounding Board in August. 
3.2.5 At the budget meeting on 22 February 2024, the Council agreed 4 new policy
savings options that would deliver savings over the period 2024-25 to 2026-27. 
The savings to be delivered in 2024-25 amount to £0.665m.  Whilst the Council
have a good track record in delivering savings, a 10% shortfall on this savings
target would amount to £0.067m. 
3.2.6 In respect of the Health and Social Care Partnership, it is the responsibility of the
Chief Officer and Chief Financial Officer to manage the HSCP financial position. 
If an overspend is forecast, a budget recovery plan will be prepared and
submitted to the IJB, the Council and NHS Highland.  Where recovery plans are
unsuccessful and an overspend occurs at the financial year end, and the HSCP
has insufficient reserves to meet the overspend, then the partners will be required
to make additional payments to the HSCP.  Whilst any additional payments by the
Council and NHS Highland will be deducted from future years funding, there is still
a financial risk that the Council may have to pay out additional monies in year.  As
at 30 June 2024, the net HSCP outturn in 2024-25 is estimated to be a £1.176m
overspend (Social Work forecasting an overspend of £0.648m and an overspend
of £0.528m from Health).  As the IJB holds significant financial reserves, there is a
nil value on the risk.   
Page 62

Page 63

3.2.7 There is an ongoing requirement to fund unavoidable inflationary cost increases in
areas like fuel, food etc. Inflation has been falling and the Bank of England
estimates that it should continue to fall this year.  We will continue to closely
monitor the situation and update our financial forecasts using the best information
available to us. A 1% general inflation increase has been included with a financial
impact of £0.800m. 
3.2.8  The Council wide risks are noted within the table below.   
Description Likelihood Assessed
Financial Impact
£000
Pay Award Exceeding 3% 3 1,264
Energy costs increase by 20% greater
than anticipated
3 650
1% variation in Council Tax Income 2 633
Councillor Pay Changes 3 178
10% shortfall on Savings Options 2 67
IJB refer to Council for additional
funding to deliver social work services
1 0
1% variation of General Inflation Risk  4 800
Total  3,592 
Capital  
3.2.9 The finance settlement announcement on 19 December 2023 provided details of
the Local Government funding for 2024-25 and there is therefore certainty as to
what our funding is in respect of the General Capital Grant and the specific capital
grants already distributed. 
3.2.10  The capital plan for 2024-25 includes an estimate of £0.750m in respect of capital
receipts.   This is based on an assessment provided by the Special Projects Team
in January 2024.  A 10% variation equates to £0.075m and this would require to
be managed across the capital programme.   
3.2.11  General feedback from Scotland Excel and the Project Managers indicates that
price increases and uncertainty continue to be experienced as well as disruptions
to the supply chain and longer lead times, particularly in relation to the
construction sector and material availability. 
3.2.12  The increased rate of inflation impacts costs such as energy prices, labour,
packaging and transport. These all influence the overall contract price and make it
extremely challenging to manage expenditure and the availability of supply. 
3.2.13 While it has been possible to estimate the impact of these pressures on some
projects, and therefore either include those projections within the capital
monitoring report or adjust the capital programme accordingly, for others it is
more difficult, and no forecast has been projected at this stage but there are likely
to be further significant financial impacts not yet reported.
Page 63

Page 64

3.3  Departmental/Service Risks 
3.3.1 The detail of each departmental financial risk is included within Appendix 1.  The
following table provides a summary of the number of risks within each department
and likelihood category with the financial impact. 
Department 1 - Remote 2 - Unlikely 3 - Possible 4 - Likely 5 - Almost
Certain Total
No £000 No £000 No £000 No £000 No £000 No £000
Chief Executive's
Unit 0 0 0 0 0 0 0 0 0 0 0 0
Executive Director
Douglas Hendry 2 20 6 560 9 730 3 435 0 0 20 1,745
Executive Director
Kirsty Flanagan 4 285 2 140 14 3,160 2 250 0 0 22 3,835
Total 6 305 8 700 23 3,890 5 685 0 0 42 5,580 
3.3.2 The current top three risks in terms of the financial impact are noted in the table
below. 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance -
Bridges, Culverts
& Sea Defences
Extreme localised weather may
result in loss of bridge, culvert,
road or sea defence.
3 750
Roads and
Infrastructure
Services
Waste PPP -
Indexation
Historical payments made
towards Waste PPP based on
indexation rates have been
challenged by Renewi resulting
in a potential cost to the council.
3 586
Financial
Services
Council Tax Debt
Collection
Recovery
Recovery of debt becomes more
difficult to pursue in the current
economic climate.  This is in
relation to historical debt that
has accumulated over many
years therefore any adverse
collection rates will impact on
the year end debt provision as
opposed to the in-year financial
position, hence no forecast
variance has been reported
within the current year.
3 345 
Page 64

Page 65

3.3.3 The risks which are likely, are noted below: 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Council Wide
- Commercial
Services
Council Wide
Central
Repairs
Increased demands on
central repair budgets (CRA)
due to a decrease in Capital
funding, increase in statutory
and emergency repairs and
increases in
supplier/contractor charges. 
This impacts on all
departments of the Council
with a Central Repairs
Budget.
4 300
Development
and
Economic
Growth
Homelessness
Temporary
Accommodatio
n Income
Unpredictable number of
Homeless applications.
Inability to recover rent. 
Increase costs of property
maintenance and tenancy
change over.
4 150
Roads and
Infrastructure
Services
Fleet
Maintenance
Increased costs to maintain
internal fleet due to
inflationary increases on
vehicles parts.
4 100
Legal and
Regulatory
Support
NPDO –
Increase in
insurance
costs within
NPDO Schools
Increase in insurance costs
as a result of the long-term
effects of Covid-19 on the
insurance market and flood
claims.
4 75
Legal and
Regulatory
Support
Elections More than 1 by-election
required outwith standard
election cycle.
4 60 
3.4  Changes to Financial Risks since last report 
3.4.1 There have been 5 changes to the departmental risks since the financial risks
report was presented to Council on 22 February 2024: 
- A new ‘possible’ risk of £0.200m for Piers and Harbours Income to
recognise that changes to ferry services may result in reduced berthing
and passenger income.
Page 65

Page 66

- A new ‘possible’ risk of £0.100m for Street Lighting to recognise that aging
lighting stock may require greater maintenance as health and safety
becomes a consideration
- A new ‘possible’ risk of £0.100m for Ferry Services to recognise that the
grant from Transport Scotland has not been increased for 2024-25 which
could result in additional costs for the Council to fund the Ferry Services.
- A new ‘possible’ risk of £0.100m for Fleet Maintenance to recognise there
may be increased costs to maintain internal fleet due to inflationary
increases on vehicle parts.
- The risk in relation to Contract RPI for NPDO and Hub Schools was
reduced from “likely” to “possible” as RPI has reduced. 
3.5 Monitoring of Financial Risks 
3.5.1  Financial risks will be reviewed and monitored on a two monthly basis and will be
included in the pack of financial reports submitted to Policy and Resources
Committee.    
3.6 Potential Future Risks 
3.6.1 Scottish Government are, over the next 2 years, proposing to extend funded
childcare to all 1 and 2 year olds across Scotland. This brings significant financial
and qualitative risks to the service. The needs and legislative requirements for this
age range would mean significant capital work across our estate and in many
settings there is not the space so extensions would be required. Having this age
range in the same play space as 3/4 year olds seriously impacts on the ability of
practitioners to effectively support age appropriate learning and play. It is
uncertain when this risk will arise. 
3.6.2 The Council’s bid to the Scottish Governments Learning Estate Investment
Programme (LEIP) for funding for a new school campus on Mull was successful
and a report was considered by Council on 24 April 2024.  Approval was granted
to utilise £5m of £9m previously earmarked funds to develop the Business Case. 
The Scottish Government will fund up to 50% of eligible costs and the estimated
cost is £43m, with £41m deemed eligible, however these are just estimates at this
stage.  Potential future risks could arise in relation to site selection, design,
construction and associated borrowing costs. 
3.6.3 In its present configuration, Argyll and Bute Council’s digital network does not
have the capacity to accommodate the requirements of the Education Services
vision nor the Scottish Government’s vision for digital access over the next four
years, including a device for every learner, which would entail a large increase in
the number of devices accessing the network. The network requires to be
redesigned to allow digital access on the scale proposed by the Scottish
Government. In addition to investment in bandwidth, device management and
protection, there is a requirement to replace existing network hardware in all
schools. Following an independent consultation on the network by Insight, IT and
Education have co-authored a paper “Resourcing Educations Digital Aspirations”
that identifies the work required to meet the Scottish Governments expectations.
COSLA have raised this issue with the Scottish Government and there is an
Page 66

Page 67

expectation that this will be fully funded as it is a Scottish Government
commitment but there remains a risk associated with this.
4 CONCLUSION
4.1 This report summarises the key financial risks facing the Council.  There are 7
Council wide risks and 42 departmental risks identified with 5 categorised as
likely.  The financial risks are monitored routinely and actions put in place to
continue to mitigate the risks.   
5 IMPLICATIONS
5.1 Policy - None.
5.2 Financial - The financial value of each risk is included within the
appendix.   
5.3 Legal - None.
5.4 HR - None.
5.5 Fairer Scotland Duty - None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty - None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  Financial risks are detailed within the appendix.
5.8 Customer Service -  None. 
5.9 The Rights of the Child
(UNCRC) - 
None.
Kirsty Flanagan
Executive Director/Section 95 Officer
6 August 2024
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services
APPENDICES
Appendix 1 – Detail of Department/Service financial risks
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 67

Page 68

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2024
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Commercial Services Catering Costs - Provision of
Meals to Early Years Children
The Children and Young People (Scotland) Act placed duties
on Councils to provide meals in an Early Years setting to
entitled children where sessions span over lunch time.  The
total quantum of grant funding is reducing and may not be
sufficient to fund the additional costs depending on uptake
and the additional costs to support the meal provision in
partner provider settings.
Joint strategy with procurement colleagues to reduce
potential impact of supplier charges.  Control food
wastage/portion controls.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Catering Purchases Increased supplier charges and higher than average inflation
on food costs.  In addition to this the Scottish Government
reviewed the regulations that govern the food and drinks
provided in schools and implemented revised regulations. 
The revised standards focus on reducing sugar, reducing red
processed meat and increasing fibre. Thus far, there has
been an increase in costs in produce and a reduction in
demand for school meals.
Joint strategy with procurement colleagues to reduce
potential impact of supplier charges.  Control food
wastage/portion controls; introduction of online ordering to
help manage food waste. Analysis and regular review of
menu choices.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Catering - Implementation of
Universal Free School Meals in
Primary Schools for P6 and P7
pupils
The Scottish Government may not give the local authority
adequate funds to support the policy to expand free school
meals in primary schools to include P6 and P7 pupils (the
scheme has already been implemented for P1 to P5 pupils).
Additionally, In 2023-24 Special Schools and Learning Centres
received FSM to S6 Level.  Although expansion paused for full
implementation for P6&7, FSM will be expanded through
entitlement to Scottish Child Payment and will be
implemented in February 2025.
Senior Manager connected into the ASSIST FM Committee
and will continue to ensure the Council's viewpoint will be
considered.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Rental Income from Properties Due to current economic climate, there may be reduced
ability to recover rental income from leased properties or
place suitable tenants in properties as leases come to an
end.
Management of leasehold properties by Estates team, any
issues with debt recovery being dealt with in line with Council
debt recovery policy.
2 60 2 60
Executive Director
Douglas Hendry
Commercial Services Surplus Properties Ongoing market difficulties lead to increased numbers of
surplus properties, in addition, as Our Modern Workspace
Project gains traction more properties will become surplus to
operational requirements. There are residual running costs
associated with all surplus properties.
One Council property team in place who will monitor market
conditions and work with prospective tenants/ purchasers to
let/sell surplus properties.
3 50 3 50
Executive Director
Douglas Hendry
Commercial Services Leisure Service Level
Agreements
Increase in RPI and/or other running costs (eg utilities,
payroll etc) resulting in requests for additional funding.
Monitoring annual alteration to contract RPI rate,
communication with service providers and mitigation through
financial forecasting and review of existing budget.
3 50 3 50
Executive Director
Douglas Hendry
Council Wide -
Commercial Services
Council Wide Central Repairs Increased demands on central repair budgets (CRA) due to a
decrease in Capital funding, increase in statutory and
emergency repairs and increases in supplier/contractor
charges.  This impacts on all departments of the Council with
a Central Repairs Budget.
Joint strategy with procurement colleagues to reduce
potential impact of supplier/contractor charges. Close
monitoring of central repairs budgets and commitments and
instructing only statutory tests/inspections and essential
repairs.
4 300 4 300
As at February 2024
(Budget Setting) As at 30 June 2024
Page 68

Page 69

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Education ASN Support Demand for ASN support continues to increase. Scottish
Government statistics suggest a 3% year on year increase,
resulting in an additional resource requirement. Particularly
where gaps in our enhanced provision exist. The medium-
term detriments on the development of young children
which occurred as a consequence of service closures during
the COVID pandemic have increased demands on the service
as children require additional support to catch up.  The
Additional Support for Learning National Implementation
plan continues to inform our strategic direction in line with
the Angela Morgan Review.
Service is currently looking at alternative options for service
delivery to mitigate the inescapable pressures. Continuing to
ensure robust assessment of needs, monthly monitoring of
budget, any delays in recruitment factored into projections to
enable informed decision making on allocation of funding for
new/amended /additional support packages. Following a full
ASN review, the service are currently investing in the
development of four new learning centres in order to provide
greater equity in meeting the more complex needs of some
learners as well as considering plans to develop enhanced
wellbeing resources across our learning estate in future.  This
aims to reduce the frequency of children having to be
educated in high cost out of area placements.
3 200 3 200
Executive Director
Douglas Hendry
Education Pre-Five Units - retention of
partner providers
Failure in the commissioning or retention of pre-five partner
provider units to deliver 1140 hours would result in an
increased pressure on the Council to deliver the service.
Annual financial appraisal; Support network; Short-term cash
injections.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Children and Young People
(Scotland) Act - ELC 1140 hours
The Council has been required to deliver 1140 hours of Early
Learning and Childcare since August 2021. The Scottish
Government has committed to funding this and the Council
has revised its service model to align it to the Scottish
Government's reduced funding profile.  A risk remains that
actual costs of delivery exceed the Government Grant in any
given year.  For example, if child numbers are higher than
estimated, this may require additional staffing which has not
been built included in the staffing model funded by Scottish
Government.   Scottish Government has included within
scope for this parliamentary session plans to further expand
on eligibility for 1140 hours to all 2 year olds and some one
year olds. As yet there has been no funding commitment.
However this will place unknown cost pressures on both our
capital and revenue budgets
Continuous monitoring and review of the service model,
usage and resources.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Education (Scotland) Act
The Education (Scotland) Act 2000 requires Councils to
undertake assessments of the need for the provision of
Gaelic Medium Primary Education (GMPE) and the duty to
support and promote Gaelic Education. This may lead to
additional staffing requirements depending upon the
demand for Gaelic from parents.
Continuous monitoring and review of the service model and
resources available within budget.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Hub DBDA/DBFM Schools  -
Litigation
Increased risk of the requirement to litigate to conclude final
capital contract payments due.
Monitoring claims and mitigation through robust challenge of
any additional claims.
2 150 2 150
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Contract RPI for NPDO and Hub
Schools
Increase in RPI would result in higher costs. Monitoring annual alteration to contract RPI rate and
mitigation through financial forecasting and review of
existing budget.
4 100 3 100
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO - Increase in insurance
costs within NPDO Schools
Increase in insurance costs as a result of the long-term
effects of Covid-19 on the insurance market and flood claims.
Monitoring annual alteration to contract insurance rate and
mitigation through financial forecasting and review of
existing budget.
4 75 4 75
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Elections More than 1 by-election required outwith standard election
cycle.
Outwith direct management control. 4 60 4 60
Page 69

Page 70

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services - Litigation Increased number of litigation cases. Ensure Legal Services are gateway to access all legal advice
and that advice is sought at earliest opportunity.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO/Hub DBFM contract
management efficiencies
Reduction in ability to generate contract management
efficiencies.
Monitoring annual efficiencies generated and mitigation
through robust contract management and application of
2 50 2 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Licensing Reduced numbers of licensing applications leading to
reduced income.
Monitoring of trends and reporting the financial impact in the
budget monitoring.
3 30 3 30
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Children's Panel Increased number of referrals increasing costs through
increases in the running costs.
Maximise the use of council facilities/resources for panel
session in the first instance.
1 10 1 10
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services Failure to minimise Council wide use of external legal advice. Ensure legal services are gateway to access all legal advice. 1 10 1 10
Executive Director
Kirsty Flanagan
Customer Support
Services
Software Licences Potential risk of being under licensed for software which will
be identified via software audits which would incur
additional costs.
ICT security and compliance officer in post and duties include
review of systems to ensure fully licenced. 
2 100 2 100
Executive Director
Kirsty Flanagan
Customer Support
Services
Additional Bandwidth for
Education
Additional costs required to be incurred in relation to
additional bandwidth required to deliver the Education
Digital Strategy due to a more digitalised learning curriculum.
Work closely with Education on Digital Devices for All
strategy to ensure necessary IT is in place.
3 50 3 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Homelessness Temporary
Accommodation Income
Unpredictable number of Homeless applications. Inability to
recover rent.  Increase costs of property maintenance and
tenancy change over.
Provision of Housing Options information and advice service
to minimise number of applicants proceeding to full
homeless application. Implementation of Rapid Rehousing
Plan.
4 150 4 150
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Dangerous Buildings
interventions
Building Standards having to deal with an increasing level of
dangerous building work which has significant financial
implications for Council.
Monitor activity and seek to recover costs from the owner. 3 100 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning Fee Penalties Potential that the Scottish Government may sanction
penalties due to poor performance by the Planning
Authority. The Scottish Government has recently appointed a
national Planning Performance Champion however the detail
of how this role intends to incentivise improvement/penalise
poor performance at a local authority level remains unclear
at this time
Maintain high levels of performance as articulated by
performance markers detailed in Planning Performance
Framework annual report.
1 100 1 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fee shortfalls Due to downturn in economic / building activity, in particular
renewable energy development and other major
developments could lead to planning fee income shortfalls
leading to revenue budget pressures.
Current income levels are looking more positive, however,
we are dependent on some high value applications coming in
which, if they don't materialise, will impact the overall
position.  Will continue to monitor Development
Management income and expenditure tightly and investigate
further income generation streams.
3 100 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Building Warrant fee shortfalls Due to loss of commercial income and downturn in economic
/ building activity, building warrant fee income shortfalls
leading to revenue budget pressures.
Continue to monitor Building Standards income and
expenditure tightly and investigate further income
generation streams.
1 50 1 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Environmental Health- export
certificates
Downturn in requests for export certificates as a result of UK
withdrawal from EU, changes to international trading
agreements or business economy. Reduction in demand
creates a budget pressure on environmental health budget.
Monitor income and resources required for export health
certificates / attestations required to support the export
market. Continue with food safety regulation activities
associated and support at 3rd country audits.  Pursue debt
2 40 2 40
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Animal Health Carrying out livestock seizure to protect welfare of the
animals
Monitor activity and seek to recover costs from the disposal
of the animals.
1 10 1 10
Page 70

Page 71

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Kirsty Flanagan
Financial Services Council Tax Debt Collection
Recovery
Recovery of debt becomes more difficult to pursue in the
current economic climate.  This is in relation to historical
debt that has accumulated over many years therefore any
adverse collection rates will impact on the year end debt
provision as opposed to the in-year financial position, hence
no forecast variance has been reported within the current
year.
Robust monitoring of arrangements with debt collection
agency and performance against target collection rates.
3 345 3 345
Executive Director
Kirsty Flanagan
Financial Services Housing Benefit Subsidy Loss of Housing Benefit Subsidy due to exceeding LA error
threshold.
Processes in place for handling of claims accurately and
efficiently.
1 125 1 125
Executive Director
Kirsty Flanagan
Financial Services Sundry Debt Recovery Recovery of debt becomes more difficult to pursue in the
current economic climate. 
Additional staff are being put in place in the Sundry Debt
Team who will work jointly with Legal Services to enhance
the robustness of the Council's debt recovery processes.
3 85 3 85
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Roads Maintenance - Bridges,
Culverts & Sea Defences
Extreme localised weather may result in loss of bridge,
culvert, road or sea defence.
Routine inspections to deal with potential weak areas - based
on a stitch in time repair regime.
3 750 3 750
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Waste PPP - Indexation Historical payments made towards Waste PPP based on
indexation rates have been challenged by Renewi resulting in
a potential cost to the council.
Conversations are in place between Council and Renewi with
the aim of minimising the potential impact.
3 586 3 586
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Roads Maintenance - Roads
Network
Adverse weather conditions result in deterioration of the
road network necessitating greater spend on repair of
defects.
Manage maintenance budgets to ensure that spend is
prioritised to deal with safety defects.
3 230 3 230
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Car Parking Income Reduced number of visitors to the area and use of council
owned car parks resulting in a reduction in income.
Closely monitor income levels throughout the year, especially
in high visitor seasons.
3 200 3 200
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Piers & Harbours Income Changes to ferry services resulting in reduced berthing and
passenger income.
Closely monitor passenger number information coming from
CalMac to identify any emerging trends with reducing
passenger numbers.
3 200
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Waste - Compost Like Output
(CLO)
Compost Like Output is an element of waste that has been
heat treated and can only be used for landfill site restoration.
Renewi are currently producing more CLO than we need and
Discussions ongoing with Renewi and the Council on steps
forward and what element the council is responsible for.
3 164 3 164
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Winter Maintenance Adverse weather conditions which require greater than
budgeted number of gritting runs.
Monitor weather conditions and apply gritting policy to
minimise costs.
3 150 3 150
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Street Lighting Age of lighting stock requires greater maintenance as health
and safety becomes a consideration.
Manage maintenance budgets to ensure that spend is
prioritised to deal with safety defects.
3 100
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Ferry Services Grant from Transport Scotland covers the cost of running the
ferry services within Argyll and Bute which has not been
increased for 2024-25 which could result in additional costs
for the Council to fund the Ferry services.
Closely monitoring financial position throughout the year to
highlight any potential pressures.  Discussions will continue to
take place with Transport Scotland on an annual basis to
request additional funding that is required for that year.
3 100
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Fleet Maintenance Increased costs to maintain internal fleet due to inflationary
increases on vehicle parts.
Review of Fleet underway to determine where reductions
could possibly be made.
4 100
38 5,080 42 5,580
Page 71

Page 72

ARGYLL AND BUTE COUNCIL  POLICY & RESOURCES COMMITTEE  
FINANCIAL SERVICES 15 AUGUST 2024 
CAPITAL BUDGET MONITORING REPORT – 30 JUNE 2024 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides an update on the position of the capital budget as at 30 June
2024. The report provides information on the financial position in respect of the
capital plan and the performance in terms of delivery of capital plan projects. 
1.2  Financial Position: 
 Current Year to Date – actual net expenditure to date is £4,869k compared
to a budget for the year to date of £4,814k resulting in an overspend for the
year to date of £55k (1.14%).
 Forecast Outturn for 2024-25 – forecast net expenditure for the full
financial year is £37,565k compared to an annual budget of £37,132k giving
rise to a forecast overspend for the year of £433k (1.17%).    
 Total Capital Plan – forecast total net project costs on the total capital plan
are £206,634k compared to a total budget for all projects of £206,201k giving
rise to a forecast overspend for the overall capital plan of £433k (0.21%). 
1.3 Project Delivery: 
 Asset Sustainability – Out of 97 projects there are 96 projects (99%) on
track, 1 project (1%) off track but recoverable and no projects off track (0%).
 Service Development - Out of 46 projects there are 42 projects (91%) on
track, 3 projects (7%) off track but recoverable and 1 project (2%) off track.
 Strategic Change – Out of 29 projects there are 28 projects (97%) on track,
1 project (3%) are off track but recoverable and no projects (0%) off track.  
1.4  The Capital Programme is funded by various income streams as detailed in
Appendix 4. Additional funding has been added: Allocation of Capital Contract
Increase Fund, Transport Scotland - Active Travel Funding, Scottish Government -
Nature Restoration, Strategic Housing Fund Contribution, Allocation of Inward
Investment Fund to Rural Growth Deal Projects and a revenue contribution from
DEG. 
1.5  The Council is projecting £750k of capital receipts this financial year. The estimated
level of receipts will be kept under review as market conditions change, as will
values following due diligence undertaken by prospective purchasers on the
condition of asset. 
Page 72

Page 73

ARGYLL AND BUTE COUNCIL  POLICY & RESOURCES COMMITTEE  
FINANCIAL SERVICES 15 AUGUST 2024 
CAPITAL BUDGET MONITORING REPORT – 30 JUNE 2024 
2.0 INTRODUCTION 
2.1 
2.2 
2.3 
2.4 
2.5 
2.6 
2.7 
This report provides an update on the position of the capital budget as at 30 June
2024. The report provides information on the financial position in respect of the capital
plan and the performance in terms of delivery of capital plan projects. 
Following the decision at Policy and Resources Committee on 9 December 2021, the
Rothesay Pavilion project was put on pause whilst potential funding options were
being considered. At the budget meeting in February 2023 additional funding was
allocated to this project which will allow the project to progress towards success by
supporting completion of certain work stages. The financial information included within
this report now includes amounts relating to Phase 1 of the Rothesay Pavilion project. 
Surveys have been completed in the Councils Learning Estates in relation to
RAAC with only 1 building confirmed as having it present with steps underway for its
removal. This will include a decant of the students for approximately 9 months plus
total removal and replacement of the roof during 2024. Funding of £3m was allocated
as part of the 2024-25 budget setting process. Additional funding of £406k has been
requested via the Capital Contract Increase Fund to meet the now increased contract
costs. 
The Councils bid to the Scottish Governments Learning Estate Investment Programme
(LEIP) for funding for a new school campus on Mull was successful. While this is good
news and will provide welcome investment in the school estate it does come with a
financial pressure that is required to be funded if the project is to proceed. The
Scottish Government will fund up to 50% of eligible costs therefore the Council will be
required to fund circa £20m. At April Council it was agreed to commence the Business
Case, undertake engagement, commence site selection processes and establish
governance arrangements. Any future capital budget provision will be built into future
budget estimates and approved as part of the budget setting process. 
A £1m cost pressure was identified during 2021-22 in relation to repairs to the A884
Ardbeg Sea Wall, where severe storm damage resulted in failure of the sea wall on
Bute. Emergency works were carried out and a permanent solution is currently being
developed. Additional funding of £1m was allocated for this purpose at the Council
meeting on 24 February 2022 however there remains a risk that costs will exceed this.
Feasibility report underway to progress the permanent works and estimated costs. 
The impact of the pandemic along with the UK exit from the European Union, the
Russian invasion of Ukraine and sanctions on Russian owned entities has seen
significant price increases as well as disruptions to the supply chain and longer lead in
times. The increased rate of inflation impacts costs such as energy prices, labour,
packaging and transport. These all have an effect on the overall contract price and
make it extremely challenging to manage expenditure and the availability of supply. 
As a result of this it should be noted that there are likely to be other significant financial
impacts which are not quantifiable at this stage, as follows: 
 Rothesay Pavilion – despite additional funding being awarded there remains a
funding gap to allow full completion of the original intended works. 
 Harbour Investment Programme – likely to be contractual cost increases in
future years (expected to be funded from increased fees and charges).
Page 73

Page 74

2.8 
 Universal Free School Meals – delayed roll out to P6 and P7 and uncertain
capital funding levels available from the Scottish Government. 
 Bridges Fund - A scheme of bridge capital works was developed and 80%
funded through the Local Bridge Maintenance Fund with £5.450m of funding
approved. Increased capital contract costs from when the scheme was
developed to now, has the schemes costing approximately £12m. Discussions
are in place to request the original funding be approved to cover a smaller
scheme with less bridges. 
 In general, capital contracts across the programme are seeing significant price
increases. 
Although the direct impact of COVID on most local services has reduced or even
ceased altogether over the last 12 months, COVID-19 in conjunction with the UK exit
from the European Union and the Russian invasion of Ukraine, continues to affect
worldwide supply chains. 
In recent years additional funding of £11.100m has been allocated to the capital
programme for this purpose which has mitigated the impact to date however, as
detailed in the table below. With £8.834m already allocated or committed this results in
£2.266m of the fund remaining unallocated to projects facing inflationary pressures. 
Funding for Capital Inflationary Pressures £m
COVID-19 Funding 0.257
February 2021 Budget Meeting - Capital Cost Pressures 4.646
February 2022 Budget Meeting - Capital Cost Pressures 3.900
February 2023 Budget Meeting – Capital Projects Inflation
Pressures 2.000
February 2024 Budget Meeting  - Capital Cost Project Protection 0.297
Total Additional Funding Allocated to Capital 11.100
Allocated to Projects within Capital Programme (5.779)
Committed for future years (3.055)
Balance Remaining 2.266 
3.0  RECOMMENDATIONS 
3.1 Note the contents of this report and the financial summaries as detailed in Appendix 6. 
Page 74

Page 75

4.0 CURRENT YEAR TO DATE FINANCIAL POSITION 
4.1 
4.2
Overall Position 
Actual net expenditure to date is £4,869k compared to a budget for the year to date of
£4,814k resulting in an overspend for the year to date of £55k (1.14%). 
Project/Department Position 
The table below shows the year to date net expenditure against the year to date
budget by project type and service: 
Project Type:
Year to
Date
Budget    
£'000
Year to
Date
Actual    
£'000
Variance       
£'000
Asset Sustainability 2,426 2,427 (1)
Service Development 248 302 (54)
Strategic Change 2,140 2,140 0
Total  4,814 4,869 (55)
Service:      
ICT 186 186 0
Education 538 559 (21)
Live Argyll 367 367 0
Health & Social Care Partnership 514 514 0
Shared Offices 59 59 0
Roads & Infrastructure 1,929 1,963 (34)
Development & Economic Growth 248 248 0
CHORD 973 973 0
Total 4,814 4,869 (55) 
Material variances are explained in Appendix 1 and there are a number of small
variances contributing to the year to date overspend. 
Page 75

Page 76

5.0 FORECAST OUTTURN 2024-25 
5.1  Overall Position 
Forecast net expenditure for the full financial year is £37,565k compared to an annual
budget of £37,132k giving rise to a forecast overspend for the year of £433k (1.17%). 
5.2 Project/Department Position 
The table below shows the forecast expenditure and budget for the year by project type
and service. 
Project Type:
Annual
Budget            
£'000
Forecast
Outturn        
£'000 
Forecast
Variance         
£'000
Asset Sustainability 26,473 26,475 (2)
Service Development 6,431 6,818 (387)
Strategic Change 4,228 4,272 (44)
Total  37,132 37,565 (433)
Service:      
ICT 1,611 1,611 0
Education 7,790 7,823 (33)
Live Argyll 1,125 1,125 0
Health & Social Care Partnership 2,335 2,335 0
Shared Offices 2,596 2,596 0
Roads & Infrastructure 20,976 21,332 (356)
Development & Economic Growth 1,498 1,498 0
CHORD (799) (755) (44)
Total 37,132 37,565 (433) 
Material variances are explained in Appendix 2 and there are a number of smaller
variances contributing to the forecast overspend. 
Page 76

Page 77

6.0  TOTAL PROJECT COSTS 
6.1 Overall Position 
Forecast total net project costs on the total capital plan are £206,634k compared to a
total budget for all projects of £206,201k giving rise to a forecast overspend for the
overall capital plan of £433k (0.21%). 
6.2  Project/Department Position 
The table below shows the forecast expenditure and budget for the total capital plan
by project type and service. 
Project Type:
Capital
Plan
Budget           
£'000
Forecast
Project
Costs        
£'000 
Total
Capital
Plan
Variance         
£'000
Asset Sustainability 52,118 52,120 (2)
Service Development 28,171 28,558 (387)
Strategic Change 125,912 125,956 (44)
Total  206,201 206,634 (433)
Service:      
ICT 5,934 5,934 0
Education 44,329 44,362 (33)
Live Argyll 3,037 3,037 0
Health & Social Care Partnership 3,936 3,936 0
Shared Offices 22,957 22,957 0
Roads & Infrastructure 60,610 60,966 (356)
Development & Economic Growth 6,408 6,408 0
CHORD 58,990 59,034 (44)
Total 206,201 206,634 (433) 
Material variances are explained in Appendix 3 and there are a number of smaller
variances leading to the forecast overspend. 
Page 77

Page 78

7.0  TOTAL PROJECT PERFORMANCE 
7.1  Overall Position 
There are 172 projects within the Capital Plan, 166 are Complete or On Target, 5 are
Off Target and Recoverable and 1 project is Off Track.
7.2  Project Position 
The table below shows the Performance Status of the Projects in the Capital Plan. 
Project Type:
Complete/
On Target
Off Target/
Recoverable
Off
Target/
Problem Total
Asset Sustainability 96 1 0 97
Service Development 42 3 1 46
Strategic Change 28 1 0 29
Total 166 5 1 172
Service:        
ICT 7 0 0 7
Education 32 1 0 33
Live Argyll 21 0 0 21
Health & Social Care
Partnership 20 0 0 20
Shared Offices 25 0 0 25
Roads & Infrastructure 38 3 1 42
Development & Economic
Growth 18 0 0 18
CHORD 5 1 0 6
Total 166 5 1 172 
Page 78

Page 79

7.3  Chart of Performance Status 
The graph provides a view of the Performance Status of the Projects included in the
Capital Plan: 
8.0 OFF TRACK PROJECTS 
8.1  The Off-Track project is noted in the table below. 
Project Type Project What is Off
Track?
Explanation
RIS – Service
Development
October 2023
Weather Incident
Total
Expenditure
Increased costs for
permanent updates to
Kilmelford Bridge due to
additional rock armour to
protect upstream and
downstream embankment. 
Page 79

Page 80

9.0 
9.1 
STRATEGIC CHANGE PROJECTS 
Appendix 5 gives detailed information in respect of the Strategic Change Projects within
the Capital Plan. The appendix gives details of the forecast cost of each project against
the approved budget, the start and anticipated completion date of the project and an
assessment of the risks of the project and, if these are not green, gives an explanation
of the problem. 
10.0 
10.1 
CHANGES TO CAPITAL PLAN 
At this early stage of the financial year there are no proposed changes to the Capital
Plan in relation to slippages, accelerations and virements. 
The gross expenditure capital plan can be found in Appendix 7. 
11.0          FUNDING 
11.1 
12.0 
The Capital Programme is funded by various income streams as detailed in Appendix 4.
Additional funding has been added: Allocation of Capital Contract Increase Fund,
Transport Scotland - Active Travel Funding, Scottish Government - Nature Restoration,
Strategic Housing Fund Contribution, Allocation of Inward Investment Fund to Rural
Growth Deal Projects and a revenue contribution from DEG. 
IMPLICATIONS 
12.1 
12.2 
12.3 
12.4 
12.5 
12.6 
12.7 
12.8 
12.9
Policy – Monitors progress against the capital plan. 
Financial – Monitors funding and commitments of the capital plan. 
Legal – Available funding may not address all Statutory and Regulatory requirements in
relation to Health and Safety. 
HR – Available funding may have an impact on the sustainability of the Property Design
Team and Infrastructure Design Team. 
Fairer Scotland Duty – None. 
12.5.1     Equalities – protected characteristics – None. 
12.5.2     Socio-economic Duty – None. 
12.5.3     Islands – None. 
Climate Change – The Council is committed to addressing climate change via projects
within the capital plan. 
Risk – There are risks around increasing capital contract costs and the level and timing
of capital receipts. 
Customer Service – None. 
The Rights of the Child (UNCRC) - None.   
Page 80

Page 81

Kirsty Flanagan 
Executive Director / Section 95 Officer
06 August 2024
Policy Lead for Finance and Commercial Services – Councillor Ross Moreland
APPENDICES
- Appendix 1 – Year To Date finance variance explanations
- Appendix 2 – Forecast Outturn variance explanations
- Appendix 3 – Total Project finance variance explanations
- Appendix 4 – Capital Funding
- Appendix 5 – Cumulative spend, completion dates and risks relating
to significant capital projects.
- Appendix 6  - Financial Summary – Overall
- Financial Summary – Executive Director Douglas Hendry
- Financial Summary – Executive Director Kirsty Flanagan
- Appendix 7  - Capital Plan
For further information contact: Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 81

Page 82

APPENDIX 1 – Year to Date Financial Variance Explanations
Listed below are the projects where the variance is +/- £50k.
Project
YTD
Budget
£’000
YTD
Actual
£’000
(Over)/
Under
Variance       
£’000
Explanation
Other variances under £50k   (55)          Total value of non-material variances less than +/-£50k
Total   (55) 
Page 82

Page 83

APPENDIX 2 – Outturn Variance Explanations
Listed below are the projects where the current year variance is +/- £50k. 
Project 
Annual
Budget
£’000
Outturn
£’000
Total
(Over)/
Under
Forecast
Variance         
£’000
Explanation
October 2023 Weather
Incident 4,348 4,634 (286) Increased costs for permanent updates to Kilmelford Bridge due to additional
rock armour to protect upstream and downstream embankment.
Other variances under £50k   (147) Total value of non-material variances less than +/-£50k.
Total  (433) 
Page 83

Page 84

APPENDIX 3 – Total Project Finance Variances
Listed below are the projects where the total project variance is +/- £50k. 
Project 
Capital
Plan
Budget
£’000
Forecast
Project
Costs
£’000
Total (Over)/
Under
Forecast
Variance         
£’000
Explanation
October 2023 Weather
Incident 4,348 4,634 (286) Increased costs for permanent updates to Kilmelford Bridge due to additional rock armour
to protect upstream and downstream embankment.
Other variances under £50k   (147)
Total value of non-material variances less than +/-£50k. Project Managers are working to
reduce these small individual overspends by identifying underspends elsewhere within the
capital plan.
Total  (433) 
Page 84

Page 85

CAPITAL PROGRAMME FUNDING Appendix 4
Estimated
Capital
Funding
Carry
Forwards
from 23-24
Slippage /
Acceleration
Additional
Funding
Updated Capital
Funding Available
Estimated
Capital
Funding
Carry
Forwards
from 23-24
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
Estimated
Capital
Funding
Carry
Forwards
from 23-24
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
General Capital Grant 9,042 0 0 0 9,042 9,069 0 0 629 9,698 8,834 0 0 0 8,834
Capital Grant - Area Control Accounts 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Transfer to Revenue for Private Sector Housing Grant (PSHG) -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033
Capital Receipts 750 -138 0 0 612 750 0 0 0 750 400 0 0 0 400
Flooding Allocation 156 0 0 0 156 156 0 0 0 156 0 0 0 0 0
Ring Fenced Capital Grant 379 0 0 0 379 618 650 0 0 1,268 0 0 0 0 0
Restricted Funding 2,553 5,140 0 972 8,665 84 6,573 0 28 6,685 0 0 0 0 0
Funded by Reserves 10,061 2,342 0 0 12,403 1,412 -92 0 0 1,320 -38 0 0 0 -38
Additional Funding from Revenue 0 0 0 4 4 0 0 0 0 0 0 0 0 0 0
Insurance 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Harbour Investment Programme 24,110 -60 0 0 24,050 39,000 -5,750 0 0 33,250 17,585 7,112 0 0 24,697
Prudential Borrowing 17,567 -1,334 0 0 16,233 166 1,600 0 0 1,766 376 -803 0 0 -427
Loans Fund Review 431 0 0 0 431 0 0 0 0 0 0 0 0 0 0
COVID Funding 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
64,016 5,950 0 976 70,942 50,222 2,981 0 657 53,860 26,124 6,309 0 0 32,433
BREAKDOWN OF ADDITIONAL FUNDING
Additional Funding 2024-25 2025-26 2026-27 Reported Source
Capital Contract Increase Fund 706 28 June - 2024-25 Restricted Funds
Transport Scotland Active Travel 395 June - 2024-25 Scottish Government
Nature Restoration Fund 234 June - 2024-25 Scottish Government
Strategic Housing Fund Contribution 250 June - 2024-25 Restricted Funds
Inward Investment Fund allocation to RGD Projects 16 June - 2024-25 Restricted Funds
Revenue Contribution 4 June - 2024-25 Revenue
2025-26 2026-272024-25
Page 85

Page 86

Strategic Change Projects - Cumulative Spend, Start/Finish Dates and Project Risks APPENDIX 5
Strategic Change Projects
Prior Years
Spend
£'000
Current Year
Forecast
£'000
Total Project
Forecast
£'000
Total Project
Budget
£'000
Project Start
Date
Estimated
Completion
Date
Project
Risks
Identified Explanation
Campbeltown Flood Scheme 13,748 1,780 15,925 15,925 01/08/2016 31/03/2025 Green
CHORD Oban 7,326 500 7,905 7,905 27/10/2016 31/03/2026 Green Issues with contract close out impacting on timescales.
CHORD Rothesay 21,046 2,655 23,701 23,657 tbc tbc Amber Project recommenced and awaiting Rural Growth Deal acceptance.
Harbour Investment Programme 9,295 24,093 91,335 91,335 01/04/2017 31/03/2028 Green
Dunoon Primary 10,637 232 10,869 10,869 18/12/2014 30/04/2020 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Replacement of Oban High 2,844 406 3,250 3,250 24/04/2014 31/01/2019 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Clean Energy - NDEEF1 1,109 222 1,331 1,331 tbc 31/03/2025 Green
Clean Energy - NDEEF2 0 590 1,140 1,140 tbc 31/03/2027 Green
Street Lighting LED Replacement 3,279 621 3,900 3,900 01/08/2016 31/12/2025 Green Tender for final package of works still to be awarded.
Helensburgh Waterfront Development 24,111 281 24,392 24,392 01/04/2017 31/03/2025 Green Physically complete, retentions outstanding
TIF - Halfway House Roundabout 66 287 640 640 tbc tbc Green Scope of project still to be determined - budget to be reprofiled.
Kirn Primary School 10,085 34 10,119 10,119 24/04/2014 31/10/2017 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Helensburgh Office Rationalisation 11,538 300 11,838 11,838 25/04/2013 31/12/2022 Green Physically complete - project subject to legal dispute.
Carbon Management Business Cases 201 0 201 201 01/02/2014 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Carbon Management - Group Heating Conversion Project 1,938 0 1,938 1,938 01/02/2016 31/12/2022 Green Project complete in full - no further expenditure expected.
CHORD Dunoon 12,499 23 12,522 12,522 03/02/2012 09/03/2018 Green Physically complete - negotiations with contractor regarding potential construction defect.
NPDO Schools Solar PV Panel Installations 761 0 761 761 26/06/2014 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Non NPDO Schools Solar PV Panel Installations 400 0 400 400 20/03/2014 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Carbon Management Capital Property Works 2016/17 19 0 19 19 01/02/2016 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Oil to Gas Heating Conversions 182 0 182 182 01/02/2012 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Kilmory Business Park Phase 2AA 60 1,035 1,129 1,129 01/02/2022 01/09/2025 Green Development Agreement still to be concluded.
Carbon Management - Non Education 29 21 50 50 01/04/2015 31/12/2025 Green Projects being determined.
Dunoon Pier OBC 2,844 0 2,844 2,844 03/02/2012 26/02/2016 Green Project complete.
Campbeltown Office Rationalisation 595 1 596 596 01/02/2015 31/03/2019 Green Project complete in full - no further expenditure expected.
TIF - Oban Airport Business Park 505 85 590 590 22/01/2015 31/12/2025 Green
Campbeltown Schools Redevelopment 2,092 38 2,130 2,130 16/02/2012 30/11/2018 Green Physically complete - negotiations with contractor delaying payment of financial sums outstanding.
CHORD - Helensburgh 6,532 25 6,557 6,557 29/09/2011 30/04/2015 Green Main contract complete. Art project proposed for 24-25.
TIF - North Pier Extension 214 0 214 214 06/12/2017 06/12/2021 Green Work to date complete - on going discussions regarding future of project.
TIF - Lorn/Kirk Road 2,169 1 2,170 2,170 22/01/2015 31/03/2021 Green Project complete in full - no further expenditure expected.
Carbon Management Fuel Conversions 107 0 107 107 01/02/2014 31/03/2019 Green Project complete in full - no further expenditure expected.
Kilmory Biomass  Carbon Management 956 0 956 956 20/09/2012 31/03/2019 Green Project complete in full - no further expenditure expected.
Net Zero 0 366 366 366 tbc tbc Green
Strategic Change Total 147,187 33,596 240,077 240,033
Project Risk Classifications:
Green - Risks can be managed and are viewed as stable or reducing.
Amber - Risks are increasing but are still manageable.
Red - Risks are increasing or have increased to such an extent they may affect delivery of the project.
Capital Expenditure Dates Risks
Page 86

Page 87

ARGYLL AND BUTE COUNCIL - CAPITAL PLAN MONITORING REPORT - OVERALL COUNCIL Appendix 6
FINANCIAL SUMMARY - NET EXPENDITURE
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance Budget 2025-26
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Executive Director Douglas Hendry 1,478 1,479 (1) 13,013 13,014 (1) 22,107 22,108 (1)
Executive Director Kirsty Flanagan 948 948 0 15,848 15,849 (1) 33,099 33,100 (1)
Asset Sustainability Total 2,426 2,427 (1) 28,861 28,863 (2) 55,206 55,208 (2)
Service Development Projects
Executive Director Douglas Hendry 0 20 (20) 193 225 (32) 16,426 16,458 (32)
Executive Director Kirsty Flanagan 1,678 1,712 (34) 12,650 13,005 (355) 45,075 45,430 (355)
Service Development Total 1,678 1,732 (54) 12,843 13,230 (387) 61,501 61,888 (387)
Strategic Change Projects
Campbeltown Schools Redevelopment 0 0 0 38 38 0 2,130 2,130 0
Dunoon Primary 0 0 0 232 232 0 10,869 10,869 0
Replacement of Oban High 0 0 0 406 406 0 3,250 3,250 0
Kirn Primary School 0 0 0 34 34 0 10,119 10,119 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Carbon Management Business Cases 0 0 0 0 0 0 201 201 0
NPDO Schools Solar PV Panel Installations 0 0 0 0 0 0 761 761 0
Non NPDO Schools Solar PV Panel Installations 0 0 0 0 0 0 400 400 0
Carbon Management Fuel Conversions 0 0 0 0 0 0 107 107 0
Carbon Management Capital Property Works 2016/17 0 0 0 0 0 0 19 19 0
Carbon Management - Group Heating Conversion Project 0 0 0 0 0 0 1,938 1,938 0
Kilmory Biomass  Carbon Management 0 0 0 0 0 0 956 956 0
Oil to Gas Heating Conversions 0 0 0 0 0 0 182 182 0
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 0 0 0 300 300 0 11,838 11,838 0
Clean Energy - NDEEF1 0 0 0 222 222 0 1,331 1,331 0
Clean Energy - NDEEF2 0 0 0 590 590 0 1,140 1,140 0
Net Zero 0 0 0 366 366 0 366 366 0
Campbeltown Flood Scheme 1,167 1,167 0 1,780 1,780 0 15,925 15,925 0
Street Lighting LED Replacement 0 0 0 621 621 0 3,900 3,900 0
Harbour Investment Programme 1,149 1,149 0 24,050 24,050 0 91,292 91,292 0
Harbour Investment Programme Non - PB 0 0 0 43 43 0 43 43 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - North Pier Extension 0 0 0 0 0 0 214 214 0
TIF - Oban Airport Business Park 0 0 0 85 85 0 590 590 0
TIF - Halfway House Roundabout 0 0 0 287 287 0 640 640 0
CHORD - Helensburgh 0 0 0 25 25 0 6,557 6,557 0
CHORD Dunoon 0 0 0 23 23 0 12,522 12,522 0
CHORD Oban 0 0 0 500 500 0 7,905 7,905 0
CHORD Rothesay 956 956 0 2,611 2,655 (44) 23,657 23,701 (44)
Helensburgh Waterfront Development 15 15 0 281 281 0 24,392 24,392 0
HWD - FFE (Funded by LA) 0 0 0 34 34 0 350 350 0
Kilmory Business Park Phase 2AA 2 2 0 1,035 1,035 0 1,129 1,129 0
Dunoon Pier OBC 0 0 0 0 0 0 2,844 2,844 0
Strategic Change Total 3,289 3,289 0 33,586 33,630 (44) 240,383 240,427 (44)
Total Expenditure 7,393 7,448 (55) 75,290 75,723 (433) 357,090 357,523 (433)
68,275
INCOME
Asset Sustainability
Executive Director Douglas Hendry 0 0 0 (1,570) (1,570) 0 (2,270) (2,270) 0
Executive Director Kirsty Flanagan 0 0 0 (818) (818) 0 (818) (818) 0
Asset Sustainability Total 0 0 0 (2,388) (2,388) 0 (3,088) (3,088) 0
Service Development Projects
Executive Director Douglas Hendry 0 0 0 0 0 0 (7,771) (7,771) 0
Executive Director Kirsty Flanagan (1,430) (1,430) 0 (6,412) (6,412) 0 (25,559) (25,559) 0
Service Development Total (1,430) (1,430) 0 (6,412) (6,412) 0 (33,330) (33,330) 0
Strategic Change Projects
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary 0 0 0 0 0 0 (137) (137) 0
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (1,149) (1,149) 0 (24,050) (24,050) 0 (91,292) (91,292) 0
01 TIF - Lorn/Kirk Road 0 0 0 0 0 0 (2,057) (2,057) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (2,320) (2,320) 0 (7,979) (7,979) 0
HWD - FFE (Funded by LA) 0 0 0 0 0 0 (350) (350) 0
Rothesay CHORD 0 0 0 (2,009) (2,009) 0 (8,854) (8,854) 0
Kilmory Business Park Phase 2AA 0 0 0 (829) (829) 0 (829) (829) 0
Kilmory Business Park Phase 2AA - HIE 0 0 0 (150) (150) 0 (150) (150) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Strategic Change Total (1,149) (1,149) 0 (29,358) (29,358) 0 (114,471) (114,471) 0
Total Income (2,579) (2,579) 0 (38,158) (38,158) 0 (150,889) (150,889) 0
Net Total 4,814 4,869 (55) 37,132 37,565 (433) 206,201 206,634 (433)
Full Year This Financial Year Total Project Costs
30 June 2024
Page 87

Page 88

MONITORING REPORT
Budget Actual Variance Budget Forecast Variance Budget Forecast Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability
Education 538 539 (1) 7,066 7,067 (1) 12,114 12,115 (1)
Live Argyll 367 367 0 1,104 1,104 0 1,741 1,741 0
Health and Social Care Partnership 514 514 0 3,722 3,722 0 4,777 4,777 0
Shared Offices 59 59 0 1,121 1,121 0 3,475 3,475 0
Asset Sustainability Total 1,478 1,479 (1) 13,013 13,014 (1) 22,107 22,108 (1)
Service Development Projects
Ardrishaig Primary Pre 5 Unit 0 0 0 0 0 0 2 2 0
Bowmore Primary School - Pre 5 Unit 0 0 0 0 0 0 149 149 0
Clyde Cottage - 600 hour provision 0 0 0 0 0 0 556 556 0
Craignish Primary School - Pre 5 Extension 0 0 0 0 0 0 400 400 0
Iona Primary School - Pre 5 Unit 0 0 0 0 0 0 490 490 0
Islay High and Rosneath Primary School Pitches 0 0 0 0 0 0 719 719 0
Lochgoilhead Primary School - Pre 5 Unit 0 0 0 0 0 0 391 391 0
Park Primary Extension/Pre Fives Unit 0 0 0 0 0 0 341 341 0
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 491 491 0
Bunessan Primary School - Gaelic Medium Improvements 0 0 0 0 0 0 120 120 0
Early Learning and Childcare 0 0 0 0 0 0 850 850 0
Early Learning and Childcare - 1140 Hours 0 20 (20) (12) 20 (32) 7,762 7,794 (32)
CO2 Monitoring - Covid Mitigation in Schools 0 0 0 113 113 0 192 192 0
Early Learning and Childcare - 1140 Hours - CFCR 0 0 0 0 0 0 1,379 1,379 0
Bowmore Primary School - Gaelic Medium Grant 0 0 0 38 38 0 38 38 0
Riverside Leisure Centre Refurbishment 0 0 0 0 0 0 1,246 1,246 0
Dunclutha Childrens Home 0 0 0 54 54 0 1,300 1,300 0
Service Development Total 0 20 (20) 193 225 (32) 16,426 16,458 (32)
Strategic Change Projects
Campbeltown Schools Redevelopment 0 0 0 38 38 0 2,130 2,130 0
Dunoon Primary 0 0 0 232 232 0 10,869 10,869 0
Replacement of Oban High 0 0 0 406 406 0 3,250 3,250 0
Kirn Primary School 0 0 0 34 34 0 10,119 10,119 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Carbon Management Business Cases 0 0 0 0 0 0 201 201 0
NPDO Schools Solar PV Panel Installations 0 0 0 0 0 0 761 761 0
Non NPDO Schools Solar PV Panel Installations 0 0 0 0 0 0 400 400 0
Carbon Management Fuel Conversions 0 0 0 0 0 0 107 107 0
Carbon Management Capital Property Works 2016/17 0 0 0 0 0 0 19 19 0
Carbon Management - Group Heating Conversion Project 0 0 0 0 0 0 1,938 1,938 0
Kilmory Biomass  Carbon Management 0 0 0 0 0 0 956 956 0
Oil to Gas Heating Conversions 0 0 0 0 0 0 182 182 0
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 0 0 0 300 300 0 11,838 11,838 0
Clean Energy - NDEEF1 0 0 0 222 222 0 1,331 1,331 0
Clean Energy - NDEEF2 0 0 0 590 590 0 1,140 1,140 0
Net Zero 0 0 0 366 366 0 366 366 0
CHORD Oban 0 0 0 500 500 0 7,905 7,905 0
CHORD Rothesay 956 956 0 2,611 2,655 (44) 23,657 23,701 (44)
CHORD - Helensburgh 0 0 0 25 25 0 6,557 6,557 0
CHORD Dunoon 0 0 0 23 23 0 12,522 12,522 0
Helensburgh Waterfront Deveopment 15 15 0 281 281 0 24,392 24,392 0
HWD - FFE (Funded by LA) 0 0 0 34 34 0 350 350 0
Kilmory Business Park Phase 2AA 2 2 0 1,035 1,035 0 1,129 1,129 0
Dunoon Pier OBC 0 0 0 0 0 0 2,844 2,844 0
Strategic Change Total 973 973 0 6,719 6,763 (44) 125,609 125,653 (44)
Total Expenditure 2,451 2,472 (21) 19,925 20,002 (77) 164,142 164,219 (77)
INCOME
Asset Sustainability
Education 0 0 0 (125) (125) 0 (125) (125) 0
Health and Social Care Partnership 0 0 0 (1,441) (1,441) 0 (2,141) (2,141) 0
Shared Offices 0 0 0 (4) (4) 0 (4) (4) 0
Asset Sustainability Total 0 0 0 (1,570) (1,570) 0 (2,270) (2,270) 0
Service Development Projects
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 (485) (485) 0
Bunessan Primary School - Gaelic Medium Improvements 0 0 0 0 0 0 (30) (30) 0
Early Learning and Childcare 0 0 0 0 0 0 (918) (918) 0
Early Years 1140 Hours 0 0 0 0 0 0 (6,300) (6,300) 0
Bowmore Primary School - Gaelic Medium Grant 0 0 0 0 0 0 (38) (38) 0
Service Development Total 0 0 0 0 0 0 (7,771) (7,771) 0
Strategic Change
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary School 0 0 0 0 0 0 (137) (137) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (2,320) (2,320) 0 (7,979) (7,979) 0
HWD - FFE (Funded by LA) 0 0 0 0 0 0 (350) (350) 0
Rothesay CHORD 0 0 0 (2,009) (2,009) 0 (8,854) (8,854) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Kilmory Business Park Phase 2AA 0 0 0 (829) (829) 0 (829) (829) 0
Kilmory Business Park Phase 2AA - HIE 0 0 0 (150) (150) 0 (150) (150) 0
Strategic Change Total 0 0 0 (5,308) (5,308) 0 (20,852) (20,852) 0
Total Income 0 0 0 (6,878) (6,878) 0 (30,893) (30,893) 0
Net Departmental Total 2,451 2,472 (21) 13,047 13,124 (77) 133,249 133,326 (77)
30 June 2024
Total Project CostsFull Year This Financial YearCurrent Financial Year To Date
Appendix 6
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR DOUGLAS HENDRY
Page 88

Page 89

MONITORING REPORT
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget
Year End
Forecast
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Roads & Infrastructure Services 778 778 0 14,579 14,580 (1) 29,921 29,922 (1)
Customer Support Services 170 170 0 1,269 1,269 0 3,178 3,178 0
Asset Sustainability Total 948 948 0 15,848 15,849 (1) 33,099 33,100 (1)
Service Development Projects
Preliminary design for  Regional Transport projects 0 0 0 16 16 0 221 221 0
Campbeltown Old Quay 0 0 0 0 0 0 1,381 1,381 0
Fleet Management - Prudential Borrowing 1,399 1,399 0 2,152 2,152 0 4,826 4,826 0
Fleet Management 0 0 0 258 258 0 4,760 4,760 0
Public Transport Operation Vehicles 0 0 0 233 233 0 233 233 0
Oban Bus Congestion - Bus Partnership Fund 0 0 0 0 0 0 50 50 0
Lismore Ferry 0 0 0 35 35 0 672 672 0
Oban Depot Development Project 0 0 0 (35) 0 (35) 2,189 2,224 (35)
Lochgilphead Depot Rationalisation 15 49 (34) 15 49 (34) 169 203 (34)
Jackson's Quarry Refurbishment 0 0 0 0 0 0 285 285 0
Weather Incident October 2023 0 0 0 4,348 4,634 (286) 4,348 4,634 (286)
Witchburn Road Demolition 0 0 0 0 0 0 158 158 0
Safe Streets, Walking and Cycling (CWSS) 0 0 0 619 619 0 4,157 4,157 0
SPT - bus infrastructure 0 0 0 25 25 0 1,430 1,430 0
Cycleways - H&L (FSPT) 0 0 0 497 497 0 3,402 3,402 0
Helensburgh Public Realm - Arts Strategy Fund 0 0 0 25 25 0 53 53 0
Town Centre Funds 9 9 0 334 334 0 4,329 4,329 0
Rural Growth Deal 161 161 0 268 268 0 507 507 0
Dunoon Cycle Bothy 28 28 0 80 80 0 563 563 0
Dunoon STEM Hub 7 7 0 2,427 2,427 0 2,558 2,558 0
Ardrishaig North Active Travel 3 3 0 49 49 0 880 880 0
Nature Restoration Fund 0 0 0 835 835 0 1,069 1,069 0
Gibraltar Street Public Realm Improvements 36 36 0 97 97 0 250 250 0
Hermitage Park 0 0 0 26 26 0 3,388 3,388 0
Glenmorag Car Park 4 4 0 4 4 0 4 4 0
Applications Projects 16 16 0 342 342 0 3,193 3,193 0
Service Development Total 1,678 1,712 (34) 12,650 13,005 (355) 45,075 45,430 (355)
Strategic Change Projects
Campbeltown Flood Scheme 1,167 1,167 0 1,780 1,780 0 15,925 15,925 0
Street Lighting LED Replacement 0 0 0 621 621 0 3,900 3,900 0
Harbour Investment Programme 1,149 1,149 0 24,050 24,050 0 91,292 91,292 0
Harbour Investment Programme - Non PB 0 0 0 43 43 0 43 43 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - North Pier Extension 0 0 0 0 0 0 214 214 0
TIF - Oban Airport Business Park 0 0 0 85 85 0 590 590 0
TIF - Halfway House Roundabout 0 0 0 287 287 0 640 640 0
Strategic Change Total 2,316 2,316 0 26,867 26,867 0 114,774 114,774 0
Total Expenditure 4,942 4,976 (34) 55,365 55,721 (356) 192,948 193,304 (356)
INCOME
Asset Sustainability
Roads & Infrastructure Services 0 0 0 (818) (818) 0 (818) (818) 0
Asset Sustainability Total 0 0 0 (818) (818) 0 (818) (818) 0
Service Development Projects
Applications Projects 0 0 0 0 0 0 (437) (437) 0
Safe Streets, Walking and Cycling 0 0 0 (376) (376) 0 (2,988) (2,988) 0
SPfT 0 0 0 (25) (25) 0 (1,268) (1,268) 0
Cycleways - H&L (FSPT) 0 0 0 (500) (500) 0 (3,502) (3,502) 0
Town Centre Funds 0 0 0 (512) (512) 0 (2,730) (2,730) 0
Rural Growth Deal 0 0 0 (396) (396) 0 (507) (507) 0
Dunoon STEM Hub 0 0 0 (2,050) (2,050) 0 (2,558) (2,558) 0
Ardrishaig North Active Travel 0 0 0 0 0 0 (50) (50) 0
Dunoon Cycle Bothy 0 0 0 (298) (298) 0 (563) (563) 0
Gibraltar Street Public Realm Improvements 0 0 0 0 0 0 (250) (250) 0
Hermitage Park 0 0 0 0 0 0 (3,319) (3,319) 0
Glenmorag Car Park 0 0 0 (4) (4) 0 (4) (4) 0
Fleet Management - PB (1,399) (1,399) 0 (2,152) (2,152) 0 (4,826) (4,826) 0
Fleet Management 0 0 0 0 0 0 (49) (49) 0
Millpark Depot Demolition Insurance 0 0 0 0 0 0 (53) (53) 0
Oban Depot - Mill Park Insurance Claim 0 0 0 0 0 0 (1,681) (1,681) 0
Oban Depot - Revenue Contribution 0 0 0 (67) (67) 0 (67) (67) 0
Lismore Ferry 0 0 0 0 0 0 (500) (500) 0
Witchburn Road Demolition 0 0 0 0 0 0 (157) (157) 0
Oban Bus Congestion - Bus Partnership Fund (31) (31) 0 (32) (32) 0 (50) (50) 0
Service Development Total (1,430) (1,430) 0 (6,412) (6,412) 0 (25,559) (25,559) 0
Strategic Change Projects
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (1,149) (1,149) 0 (24,050) (24,050) 0 (91,292) (91,292) 0
01 TIF - Lorn/Kirk Road 0 0 0 0 0 0 (2,057) (2,057) 0
Strategic Change Total (1,149) (1,149) 0 (24,050) (24,050) 0 (93,619) (93,619) 0
Total Income (2,579) (2,579) 0 (31,280) (31,280) 0 (119,996) (119,996) 0
Net Departmental Total 2,363 2,397 (34) 24,085 24,441 (356) 72,952 73,308 (356)
30 June 2024
Full Year This Financial Year Total Project Costs
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR KIRSTY FLANAGAN
Appendix 6
Page 89

Page 90

CAPITAL PLAN 2024-25 APPENDIX 7
Overall Summary
Service
Previous
Years
£000s
2024-25              
£000s
2025-26                
£000s
2026-27                 
£000s
2027-28                
£000s
Total
£000s
Education 39,399 7,915 3,060 1,988 0 52,362
Shared Offices 17,806 2,600 2,522 382 0 23,310
ICT 2,851 1,611 1,221 688 0 6,371
RIS 38,592 48,095 44,779 28,907 0 160,373
DEG 19,604 5,659 941 0 0 26,204
HSCP 1,246 3,776 1,055 0 0 6,077
Live Argyll 1,275 1,125 169 468 0 3,037
CHORD 74,734 4,509 113 0 0 79,356
Overall Total 195,507 75,290 53,860 32,433 0 357,090
Page 90

Page 91

CAPITAL PLAN 2024-25 APPENDIX 7
Education
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26                
£000s
2026-27            
£000s
2027-28            
£000s
Total
£000s
Asset Sustainability Education Asbestos Control/Removal Works 0 0 0 0 0 0
Block Allocation - Education 0 568 520 1,988 0 3,076
Digital Inclusion 20-21 0 9 0 0 0 9
Free School Meals 0 0 434 0 0 434
Primary Schools 0 3,013 1,280 0 0 4,293
Primary Schools - CFCR 0 0 0 0 0 0
School Houses - Housing Quality Standard 0 0 0 0 0 0
Secondary Schools 0 1,086 226 0 0 1,312
Asset Sustainability Total 0 7,066 3,060 1,988 0 12,114
Service Development Education Ardrishaig Primar School - Pre Five Extension 2 0 0 0 0 2
Bowmore Primary School - Gaelic Medium Grant 0 38 0 0 0 38
Bowmore Primary School - Pre Five Unit 149 0 0 0 0 149
Bunessan Primary School - Gaelic Medium Improvements 120 0 0 0 0 120
Clyde Cottage - 600 hours provision 556 0 0 0 0 556
CO2 Monitoring - Covid Mitigation in Schools 79 113 0 0 0 192
Craignish Primary School - Pre Five Extension (600 hours funding) 400 0 0 0 0 400
Early Learning and Childcare 850 0 0 0 0 850
Early Learning and Childcare - 1140 Hours 7,774 -12 0 0 0 7,762
Early Learning and Childcare - 1140 Hours - CFCR 1,379 0 0 0 0 1,379
Iona Primary School - Pre Five Unit (600 hours funding) 490 0 0 0 0 490
Islay High & Rosneath PS Pitches 719 0 0 0 0 719
Lochgoilhead Primary School - Pre Five Unit (600 hours funding) 391 0 0 0 0 391
Park Primary Extension and Pre Fives Unit 341 0 0 0 0 341
Sandbank Gaelic Pre Five Unit 491 0 0 0 0 491
Service Development Total 13,741 139 0 0 0 13,880
Strategic Change Education Campbeltown Schools Redevelopment 2,092 38 0 0 0 2,130
Dunoon Primary School 10,637 232 0 0 0 10,869
Kirn Primary School 10,085 34 0 0 0 10,119
Replacement of Oban High School 2,844 406 0 0 0 3,250
Strategic Change Total 25,658 710 0 0 0 26,368
Overall Total 39,399 7,915 3,060 1,988 0 52,362
Page 91

Page 92

CAPITAL PLAN 2024-25 APPENDIX 7
Shared Office
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26      
£000s
2026-27        
£000s
2027-28    
£000s
Total
£000s
Asset Sustainability Shared Offices 52 Sinclair Street Flats - CFCR 0 0 0 0 0 0
5-7 East Clyde Street - Coastal Communities Fund 0 0 0 0 0 0
Block Allocation 0 320 427 382 0 1,129
Burnett Building 0 107 0 0 0 107
Helensburgh and Lomond Civic Centre 0 140 0 0 0 140
Kilmory Castle 0 0 1,545 0 0 1,545
Legionella Control Works 0 12 0 0 0 12
Our Modern Workspace 0 542 0 0 0 542
Asset Sustainability Total 0 1,121 1,972 382 0 3,475
Strategic Change Shared Offices Campbeltown Office Rationalisation 595 1 0 0 0 596
Carbon Management - Group Heating Conversion Project (Prudential Borrowing)1,938 0 0 0 0 1,938
Carbon Management Business Cases (FPB) 201 0 0 0 0 201
Carbon Management Capital Property Works 16/17 19 0 0 0 0 19
Carbon Management Fuel Conversions (FPB) 107 0 0 0 0 107
Clean Energy - NDEEF1 1,109 222 0 0 0 1,331
Clean Energy - NDEEF2 0 590 550 0 0 1,140
Helensburgh Office Rationalisation  (FPB,REC) 11,538 300 0 0 0 11,838
Kilmory Biomass Project OBC (FPB,REV) 956 0 0 0 0 956
Net Zero 0 366 0 0 0 366
Non-NPDO Schools PV Panel Installations 400 0 0 0 0 400
NPDO Schools Solar PV Panel Installations 761 0 0 0 0 761
Oil to Gas Heating Conversions (FPB) 182 0 0 0 0 182
Strategic Change Total 17,806 1,479 550 0 0 19,835
Overall Total 17,806 2,600 2,522 382 0 23,310
Page 92

Page 93

CAPITAL PLAN 2024-25 APPENDIX 7
ICT
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26      
£000s
2026-27     
£000s
2027-28       
£000s
Total
£000s
Asset Sustainability ICT Block Allocation - ICT 0 132 0 688 0 820
PC Replacement 0 561 669 0 0 1,230
Server Sustainability 0 488 400 0 0 888
Telecomms Network 0 88 152 0 0 240
Asset Sustainability Total 0 1,269 1,221 688 0 3,178
Service Development ICT Applications Projects 2,851 342 0 0 0 3,193
Service Development Total 2,851 342 0 0 0 3,193
Overall Total 2,851 1,611 1,221 688 0 6,371
Page 93

Page 94

CAPITAL PLAN 2024-25 APPENDIX 7
Roads and Infrastructure Services
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26   
£000s
2026-27    
£000s
2027-28    
£000s
Total
£000s
Asset Sustainability RIS Block Allocation 0 0 4,168 3,823 0 7,991
Bridge Strengthening 0 141 1,243 0 0 1,384
Bute Sea Wall Repairs 0 633 0 0 0 633
Claonaig Landslip 0 1,142 28 0 0 1,170
Coastal Change Adaptation 0 67 237 0 0 304
Coastal Protection 0 196 0 0 0 196
Environmental Projects 0 721 0 0 0 721
EV Quick Chargers 0 52 0 0 0 52
Flood Prevention 0 1,041 156 0 0 1,197
Footway Improvements 0 219 0 0 0 219
Gartbreck - Capping 0 194 0 0 0 194
Glengorm - Capping 0 0 0 0 0 0
Glengorm - Cell and Transfer Station (PB) 0 -1 0 0 0 -1
Helensburgh CHORD - Signage etc 0 10 0 0 0 10
Helensburgh Flood Mitigation 0 0 427 0 0 427
Investment in Active Travel 0 200 0 0 0 200
Local Bridge Maintenance Fund 0 230 4,760 0 0 4,990
Plant and Machinery 0 0 0 0 0 0
Play Park Renewal 0 547 391 0 0 938
POPs Waste 0 86 0 0 0 86
Public Convenience Upgrades 0 118 109 0 0 227
RIS - Roads Plant and Equipment - CFCR 0 0 0 0 0 0
Roads Reconstruction 0 8,043 0 0 0 8,043
Roads Reconstruction - Helensburgh CHORD 0 47 0 0 0 47
Roads Reconstruction - Oban CHORD 0 3 0 0 0 3
Tobermory Car Park 0 96 0 0 0 96
Asset Sustainability Total 0 14,579 11,519 3,823 0 29,921
Service Development RIS Campbeltown Old Quay 1,381 0 0 0 0 1,381
Cuan Ferry - Hitrans 0 0 0 0 0 0
Depot Rationalisation 0 0 0 0 0 0
Fleet Management 4,502 258 0 0 0 4,760
Fleet Management - Prudential Borrowing 2,674 2,152 0 0 0 4,826
Jackson's Quarry Refurbishment 285 0 0 0 0 285
Lismore Ferry Replacement 637 35 0 0 0 672
Lochgilphead Depot Rationalisation 154 15 0 0 0 169
Oban Bus Congestion - Bus Partnership Fund 50 0 0 0 0 50
Oban Depot Development 2,224 -35 0 0 0 2,189
October Weather Incident 0 4,348 0 0 0 4,348
Preliminary design for  Regional Transport projects (tif) 205 16 0 0 0 221
Public Transport Operation Vehicles 0 233 0 0 0 233
Witchburn Road Demolition 158 0 0 0 0 158
Service Development Total 12,270 7,022 0 0 0 19,292
Strategic Change RIS Campbeltown Flood Scheme 13,748 1,780 10 387 0 15,925
Harbour Investment Programme Non PB 0 43 0 0 0 43
Harbour Investment Programme PB 9,295 24,050 33,250 24,697 0 91,292
Street Lighting LED Replacement 3,279 621 0 0 0 3,900
Strategic Change Total 26,322 26,494 33,260 25,084 0 111,160
Overall Total 38,592 48,095 44,779 28,907 0 160,373
Page 94

Page 95

CAPITAL PLAN 2024-25 APPENDIX 7
Development and Economic Growth
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26    
£000s
2026-27     
£000s
2027-28     
£000s
Total
£000s
Service Development DEG Ardrishaig North Active Travel 831 49 0 0 0 880
Cycleways - H&L (FSPT) 2,905 497 0 0 0 3,402
Dunoon Cycle Bothy 483 80 0 0 0 563
Dunoon STEM Hub 131 2,427 0 0 0 2,558
Gibraltar Street Public Realm Improvements 153 97 0 0 0 250
Glenmorag Car Park PC 0 4 0 0 0 4
Helensburgh Public Realm - Arts Strategy Fund 3 25 25 0 0 53
Hermitage Park 3,362 26 0 0 0 3,388
Nature Restoration Fund 0 835 234 0 0 1,069
Rural Growth Deal 239 268 0 0 0 507
Safe Streets, Walking and Cycling (CWSS) 3,143 619 395 0 0 4,157
SPT - bus infrastructure 1,405 25 0 0 0 1,430
West Coast UAV Innovation Logistics and Training Hub 0 0 0 0 0 0
Service Development Total 16,650 5,286 654 0 0 22,590
Strategic Change DEG 01 TIF - Lorn/Kirk Road 2,169 1 0 0 0 2,170
05 TIF - North Pier Extension 214 0 0 0 0 214
09 TIF - Oban Airport Business Park 505 85 0 0 0 590
TIF - Halfway House Roundabout 66 287 287 0 0 640
Strategic Change Total 2,954 373 287 0 0 3,614
Overall Total 19,604 5,659 941 0 0 26,204
Page 95

Page 96

CAPITAL PLAN 2024-25 APPENDIX 7
Health & Social Care Partnership
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26   
£000s
2026-27    
£000s
2027-28    
£000s
Total
£000s
Asset Sustainability HSCP Ardfenaig 0 12 0 0 0 12
Capital Property Works 0 55 0 0 0 55
Digitalising telecare 0 0 0 0 0 0
Eadar Glinn 0 34 0 0 0 34
East King Street Childrens Home 0 0 0 0 0 0
Glencruitten Hostel 0 301 0 0 0 301
Gortonvogie 0 0 0 0 0 0
Greenwood/Woodlands 0 1 0 0 0 1
HSCP - 102 East King Street "Jean's Bothy" - Rewire - 23-240 4 0 0 0 4
Kintyre Care Home 0 150 650 0 0 800
Rothesay Community Education Centre 0 0 0 0 0 0
Shellach View 0 2 0 0 0 2
Struan Lodge Boiler 0 700 0 0 0 700
Thomson Home Rothesay 0 270 370 0 0 640
Tigh An Rudha HFE 0 2,178 35 0 0 2,213
Tobermory Top Flat 0 0 0 0 0 0
Asset Sustainability Total 0 3,722 1,055 0 0 4,777
Service Development HSCP Dunclutha Childrens Home 1,246 54 0 0 0 1,300
Service Development Total 1,246 54 0 0 0 1,300
Overall Total 1,246 3,776 1,055 0 0 6,077
Page 96

Page 97

CAPITAL PLAN 2024-25 APPENDIX 7
Live Argyll
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26    
£000s
2026-27   
£000s
2027-28 
£000s
Total
£000s
Asset Sustainability Live Argyll Aqualibrium 0 63 104 0 0 167
Capital Property Works 0 24 0 382 0 406
Corran Halls Gaelic Centre 0 19 0 86 0 105
Dunoon Community Education Centre - CFCR 0 0 0 0 0 0
Gym Equipment - CFCR 0 0 0 0 0 0
Kintyre Community Education Centre 0 6 0 0 0 6
Lochgilphead Community Ed Centre 0 411 0 0 0 411
Lochgilphead Library Relocation 0 0 0 0 0 0
Queen's Hall - Partition Wall 0 0 0 0 0 0
Riverside Leisure Centre - Spa Pool Upgrade 0 0 0 0 0 0
Rothesay Swimming Pool 0 24 65 0 0 89
The Moat Centre 0 393 0 0 0 393
The Moat Centre - Gym Store 0 0 0 0 0 0
Asset Sustainability Total 0 1,104 169 468 0 1,741
Service Development Live Argyll Riverside Leisure Centre Refurbishment 1,246 0 0 0 0 1,246
Service Development Total 1,246 0 0 0 0 1,246
Strategic Change Live Argyll Carbon Management 29 21 0 0 0 50
Strategic Change Total 29 21 0 0 0 50
Overall Total 1,275 1,125 169 468 0 3,037 Page 97

Page 98

CAPITAL PLAN 2024-25 APPENDIX 7
Major Projects
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26     
£000s
2026-27          
£000s
2027-28     
£000s
Total
£000s
Strategic Change CHORD CHORD - Dunoon 12,499 23 0 0 0 12,522
CHORD - Helensburgh -Public Realm Imprv 6,532 25 0 0 0 6,557
CHORD - Oban 7,326 500 79 0 0 7,905
CHORD - Rothesay 21,046 2,611 0 0 0 23,657
Helensburgh Waterfront Development 24,111 281 0 0 0 24,392
HWD - FFE 316 34 0 0 0 350
Kilmory Business Park Phase 2AA 60 1,035 34 0 0 1,129
OBC for Dunoon Pier 2,844 0 0 0 0 2,844
Strategic Change Total 74,734 4,509 113 0 0 79,356
Overall Total 74,734 4,509 113 0 0 79,356
Page 98

Page 99

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES     15 AUGUST 2024
TREASURY MANAGEMENT MONITORING REPORT – 30 JUNE 2024
1.0.  EXECUTIVE SUMMARY
1.1. This report sets out the Council’s treasury management position for the period 1 April
2024 to 30 June 2024 and includes information on:
 Overall borrowing position
 Borrowing activity
 Investment activity
 Economic background
 Interest rate forecast
 Prudential Indicators
1.2. Estimated borrowing is below the Capital Financing Requirement for the period to 30 June
2024, at this stage in the financial year capital expenditure is below target. 
1.3. The net movement in external borrowing in the period 1 April 2024 to 30 June 2024 was
£5.7m.
1.4. The levels of investments were £59.638 at 30 June 2024. The rate of return achieved was
5.276% compared to the target SONIA rate which was 5.200%.
1.5. The Council has significant cash balances which are invested in accordance with its
Annual Treasury Management Strategy on the basis of security first, liquidity second and
then return.
Page 99

Page 100

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES     15 AUGUST 2024
TREASURY MANAGEMENT MONITORING REPORT – 30 JUNE 2024
2.0. INTRODUCTION
2.1. This report sets out the Council’s treasury management position for the period 1 April
2024 to 30 June 2024 and includes information on:
 Overall borrowing position
 Borrowing activity
 Investment activity
 Economic background
 Interest rate forecast
 Prudential Indicators
3.0. DETAIL
Overall Borrowing Position
3.1. The table below details the estimated capital financing requirement (CFR) and compares
this with the estimated level of external debt at 31 March 2024. The CFR represents the
underlying need for the Council to borrow to fund its fixed assets and accumulated capital
expenditure.
3.2. Borrowing is below the Capital Financing Requirement for the period to 30 June 2024.
The Council has delayed taking out any new long term borrowing, as rates are
expected to drop towards the end of 2024 plus the Council has significant cash
balances which reduces the need to borrow in the short term.
3.3. The Council’s Treasury Management Strategy states that any decision to borrow in
advance will be within forward approved Capital Financing Requirement estimates.
3.4. The Council’s estimated net capital financing requirement at 30 June 2024 is
£254.701m. The table below shows how this has been financed. £113.642m is
funded by loans and there are substantial internal balances of £200.697m of which
£59.638m are currently invested, as detailed in section 3.7, leaving a net internal
Forecast Forecast Forecast
2024/25 2025/26 2026/27
£000 £000 £000
CFR at 1 April 332,394 360,485 382,575
Net Capital Expenditure 40,283 35,016 24,270
Less Loans Fund Principal Repayments -6,254 -6,691 -6,962
Less: NPDO Repayment -5,938 -6,235 -6,844
Estimated CFR 31 March 360,485 382,575 393,039
Less Funded by NPDO -105,784 -105,846 -100,611
Estimated Net CFR 31 March 254,701 276,729 292,428
Estimated External Borrowing at 31 March
190,835 209,152 227,472
Gap 63,866 67,577 64,956
Page 100

Page 101

balance of £141.059m. 
3.5. During the period from 1 April 2024 to 30 June 2024, £5.8m of loans were repaid. 
The analysis of the movement in borrowing is shown in the table below: 
3.6. The table below summarises the movement in the level and rate of temporary
borrowing at the start and end of the period. 
Position at
31/03/24
Position at
30/06/24
£000 £000
Loans 119 114
Net Internal Balances 67 141
Total CFR 187 255
Actual
£m
(6)
0
Net Movement in External Borrowing (6)
External Loans Repaid 1st April 2024 to 30th June 2024
Borrowing undertaken 1st April 2024 to 30th June 2024
£000 % Rate
Temp borrowing at 31st March 2024 5,251 4.70%
Temp borrowing at 30th June 2024 328 4.75%
Page 101

Page 102

Investment Activity
3.7.     The average rate of return achieved in the Council’s investments to 30 June 2024 was
5.276% compared to the SONIA (Sterling Overnight Index Average) rate for the same period of
5.200%. At 30 June 2024 the Council had £59.638m of short term investments at an
average rate of 5.276%. The table below details the counterparties that the investments
were placed with, the maturity date, the interest rate and the credit rating applicable for
each counterparty. 
3.8. All investments and deposits are in accordance with the Council’s approved list of
counterparties and within the limits and parameters defined in the Treasury Management
Practices. The counterparty list is constructed based on assessments by leading credit
reference agencies adjusted for additional market information available in respect of
counterparties. 
3.9. The Council has significant cash balances which are invested in accordance with its
Annual Treasury Management Strategy. 
Counterparty Maturity Amount £000 Interest
Rate
Rating  S&P
Clydesdale Bank Instant
Access
338 5.15% Short Term A-2, Long
Term A-
London Borough of Croydon 10/10/2024 5,000 4.10% AA
First Abu Dhabi Bank 09/08/2024 5,000 6.16% Short Term A-1+,
Long Term AA-
ANZ 25/07/2024 5,000 5.32% Short Term A-1+,
Long Term AA-
Goldman Sachs 25/10/2024 5,000 5.34% Short Term A-1, Long
Term A+
Al Rayan 07/11/2024 5,000 5.35% Short Term P-1, Long
Term A2 (Moody's)
Al Rayan 08/11/2024 5,000 5.35% Short Term P-1, Long
Term A2 (Moody's)
DBS 15/08/2024 5,000 5.28% Short Term A-1+,
Long Term AA-
ANZ 05/09/2024 5,000 5.24% Short Term A-1+,
Long Term AA-
DBS 18/09/2024 5,000 5.31% Short Term A-1+,
Long Term AA-
Money Market Fund - BNP Paribas Call 13,300 5.26% AAA
MMF - Aviva Call 1,000 0.00% AAA
Total 59,638
Page 102

Page 103

Economic and Interest Rate Forecasts
3.10. The latest economic background is shown in Appendix 1 with the interest rate forecast in
Appendix 2.
Prudential Indicators
3.11. The prudential indicators for 2024-25 are attached in Appendix 3.
4.0. CONCLUSION
4.1 In the period from 1 April 2024 to 30 June 2024, the Council’s borrowing decreased by £5.8m,
and it is currently below the Capital Financing Requirement. There are substantial internal
balances, of which £59.638m is currently invested. The average rate of investment returns
during the period was 5.276%.
5.0. IMPLICATIONS
5.1. Policy  None 
5.2. Financial Complies with Annual Treasury Strategy
5.3. Legal  None
5.4. HR None
5.5. Fairer Duty Scotland: 
5.5.1  Equalities – protected characteristics  None
5.5.2  Socio-economic Duty None
5.5.3  Islands  None
5.6. Climate Change  None
5.7. Risk  None
5.8. Customer Service  None
5.9 The Rights of the Child (UNCRC) None.
Kirsty Flanagan
Executive Director/Section 95 Officer
6 August 2024
Policy Lead for Finance and Commercial Services - Councillor Ross Moreland
Appendix 1 – Economic Background
Appendix 2 – Interest Rate Forecast
Appendix 3 – Prudential Indicators
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 103

Page 104

Appendix 1 – Economics Update
 The first quarter of 2024/25 saw:
- GDP growth flatlining in April following positive Q4 2023/24 growth figures of 0.7% q/q.
- A stalling in the downward trend in wage growth, with the headline 3myy rate staying at 5.9%
in April.
- CPI inflation falling from 2.3% in April to 2.0% in May.
- Core CPI inflation decreasing from 3.9% in April to 3.5% in May.
- The Bank of England holding rates at 5.25% in May and June.
- 10-year gilt yields climbing to 4.35% in April, before closing out at 4.32% in May.
 The news that the economy grew by 0.7% q/q in Q4 2023/24 confirmed that it moved out of its very
mild technical recession that prevailed at the back end of 2023. However, data released for April
and May so far shows a slight stalling in the recovery, with GDP data for April coming out at 0.0%
m/m, as inclement weather weighed on activity.  Moreover, the fall in the composite Purchasing
Manager Index output balance from 53.0 in May to 51.7 in June confirms tepid growth.
 On a more positive note, the 2.9% m/m increase in retail sales volumes in May more than reversed
the 1.8% m/m drop in April as rainfall returned to seasonal norms. The strength was broad-based
across the retail sector, including online, (+5.9% m/m) suggesting an underlying strengthening in
sales beyond weather effects. With inflation falling back to target, Bank Rate likely to be reduced
soon and with consumer confidence improving, retail sales may well continue to strengthen.
 Stronger consumer spending, as low inflation allows households’ real incomes to strengthen and
the drag from higher interest costs fades, suggests that real consumption will strengthen
substantially over the next two years. However, investment will only make a modest contribution to
GDP growth. With the industrial sector still 12% smaller than in 2019, excess capacity will continue
to cap the need for industrial firms to invest. But improving business sentiment should raise
investment by services’ firms. Further, a fall in mortgage rates should trigger a recovery in residential
investment. Overall, strong consumer spending is likely to be the backbone of GDP growth, along
with government consumption.  Our colleagues at Capital Economics forecast that following GDP
growth of 1.0% in 2024, activity will continue to surprise to the upside with GDP growth of 1.5% for
both 2025 and 2026 (consensus forecasts are 1.2% and 1.4% respectively).
 Nonetheless, the on-going stickiness of wage growth in April will be a lingering concern for the Bank
of England. The 3myy rate of average earnings growth stayed at 5.9% in April (consensus 5.7%),
whilst the more timely 3m annualised rate rebounded from 5.9% to 9.3%. This stickiness partly
reflected April’s 9.8% increase in the minimum wage. This leaves the Bank of England’s forecast
for a fall back in regular private sector pay growth from 5.8% in April to 5.1% in June looking a
challenge.
 Despite the stickiness of wage growth in April, sharp falls in employment and a move up in
unemployment suggests that wage growth will soon be back on a downward path. The 139,000 fall
in employment in the three months to April was accompanied by a rise in the unemployment rate
from 4.3% to 4.4%. This was the fourth increase in a row and took it to its highest level since
September 2021. The rise would have been larger were it not for the 132,000 increase in inactivity
in the three months to April as the UK’s disappointing labour market participation performance since
the pandemic continued. The vacancies data also paint a picture of a slowly cooling labour market.
The number of job vacancies fell from an upwardly revised 908,000 to 904,000, leaving vacancies
31% below the peak in May 2022, but 11% above the pre-pandemic level.
 The fall in CPI inflation in May back to the Bank’s 2% target for the first time since July 2021 will
have come as welcome news to the Bank. Furthermore, with CPI inflation of 3.3% in the US and
2.6% in the Euro-zone in May, the UK appears to have won the race to get CPI inflation back to
Page 104

Page 105

2.0%. A further easing in food inflation from 2.8% in April to 1.6% in May played a part in the fall in
overall CPI inflation and with food producer price inflation at just 0.2% in May, food price inflation
will probably soon fall to zero. 
 The core rate also fell back from 3.9% to 3.5%. Within that, core goods CPI inflation slipped below
zero for the first time since October 2016.  As expected, clothing/footwear, recreation/culture and
restaurants/hotels categories inflation declined, reflecting base effects from big increases last May.
While services inflation fell from 5.9% to 5.7%, this decline was smaller than the Bank of England
expected (forecast 5.3%). And the timelier three-month annualised rate of services prices has
rebounded from 8.5% to 9.2%. This suggests that the persistence in domestic inflation that the Bank
is worried about is fading more slowly than it thought. Even so, there is scope for inflation to fall
further. 
 There was little chance that the Bank would cut rates at its June meeting, given upside surprises
on services CPI inflation and wage growth. But several developments implied a rate cut is getting
closer (August?). First, two members of the MPC, Ramsden and Dhingra voted again to reduce
rates immediately to 5.00%. Second, despite the recent run of stronger inflation and activity, the
minutes noted “indicators of inflation persistence had continued to moderate” and that a range of
indicators suggest pay growth had continued to ease. And there was new wording that members of
the MPC will consider all the information available and how this affects the assessment that the
risks from inflation persistence are receding “as part of the August forecast round”. 
 Throughout the quarter there was a degree of volatility in the gilt market and, by way of example,
the 10-year gilt yield rose from 4.05% on 2nd April to finish at 4.15% on 28th June but it has exceeded
4.30% on several occasions.  Overall, investors judged that interest rates will need to remain high
for longer to keep inflation around the 2.0% target. 
 Meanwhile, the FTSE 100 broke through the 8,000 mark in April for the first time since its brief three-
day flutter in February last year and reached a record closing high of 8,446 on 15th May.  However,
by the end of the quarter, despite AI-fuelled rises in the US S&P500, it finished rather tamely and
had fallen back to 8,164.  Arguably, significant interest rate cuts and an on-going UK economic
recovery will be required for a further resurgence to take hold. 
PWLB maturity Certainty Rates 1st April to 30th June 2024 
 Gilt yields and PWLB rates remained relatively stable between 1st April and 30th June.  Having said
that, the spread between the low and high points during the quarter was between 0.3% and 0.45%
across the curve. 
 The 50-year PWLB Certainty Rate target for new long-term borrowing (the low point of our forecast
on a two-year timeline) started 2024/25 at 4.00% and increased to 4.20% on 28th May.  As can be
seen, with rates remaining elevated across the whole of the curve, it is advised to not borrow long-
term unless the Authority wants certainty of rate and judges the cost to be affordable.   
Page 105

Page 106

MPC meetings 9th May and 20th June 2024
 On 9th May, the Bank of England’s Monetary Policy Committee (MPC) voted 7-2 to keep Bank Rate
at 5.25%.  This outcome was repeated on 20th June.  
 Nonetheless, with UK CPI inflation now back at 2% and set to fall further over the coming months,
Ramsden and Dhingra – who voted again to reduce rates immediately to 5.00% in June – may
shortly be joined by some members in the no-change camp, for whom the June decision was “finely
balanced” as the upside news on services price inflation was more likely to be a reflection of one-
off effects and volatile components rather than factors that would push up “medium-term inflation”.   
Page 106

Page 107

Appendix 2 – Interest Rate Forecast 
The Council has appointed Link Group as its treasury advisors and part of their service is to assist the
Council to formulate a view on interest rates. The PWLB rate forecasts below are based on the Certainty
Rate (the standard rate minus 20 bps) which has been accessible to most authorities since 1st
November 2012.  For Housing Revenue Account authorities, the lower Housing Revenue Account
(HRA) PWLB rate has also been available since 15 June 2023 (standard rate minus 60 bps) but is
available for HRA borrowing only. 
The latest forecast, updated on 28th May, sets out a view that both short and long-dated interest rates
will start to fall once it is evident that the Bank of England has been successful in squeezing excess
inflation out of the economy, despite a backdrop of a stubbornly robust economy and a tight labour
market. 
Moreover, whatever the shape of domestic data, recent gilt market movements have been heavily
influenced by the sentiment pertaining to US monetary policy.  Again, inflation and labour data has
proven sticky and the market’s expectation for rate cuts has gradually reduced throughout the course
of the year, so that possibly rates may not be cut more than once, or possibly twice, before the end of
2024.  In any event, even if the Bank of England starts to cut rates first, it may mean that the medium
and longer parts of the curve take longer to fully reflect any such action until the US yield curve shifts
lower too.  Given the potential inflationary upside risk to US treasuries if Trump wins the presidential
election in November (increased tariffs on imports from China for example), therein lies a further risk
to yields remaining elevated for longer. 
Closer to home, the General Election is not expected to have a significant impact on UK monetary
policy.  There is minimal leeway for further tax cuts or added spending without negatively impacting
market sentiment.  It may even be the case that the Bank of England will steer clear of an August rate
cut – should that be supported by the inflation data – in favour of weighing up fiscal policy implications
and market sentiment in the aftermath of the election.   
Accordingly, Link’s central case is still for a rate cut before the end of September, but we are not
committed to whether it will be in August or September.  Thereafter, the path and speed of rate cuts is
similar to that which we previously forecast, with Bank Rate eventually falling to a low of 3% by H2
2026. 
However, given the increased uncertainty surrounding Link’s central gilt market forecasts, and the
significant issuance that will be on-going from several of the major central banks, it has marginally
increased its PWLB forecasts by c20 to 30 basis points across the whole curve since the previous
quarter.   
In summary, regarding PWLB rates, movement in the short-end of the curve is expected to reflect Link’s
Bank Rate expectations to a large degree, whilst medium to longer-dated PWLB rates will remain
influenced not only by the outlook for inflation, domestically and globally, but also by the market’s
appetite for significant gilt issuance (£200bn+ for each of the next few years).  As noted at the Link
March Strategic Issues webinars, there is upside risk to that part of our forecast despite the Debt
Management Office skewing its issuance to the shorter part of the curve. 
Page 107

Page 108

 Money market yield forecasts are based on expected average earnings by local authorities for 3 to
12 months.
 The Link forecast for average earnings are averages i.e., rates offered by individual banks may
differ significantly from these averages, reflecting their different needs for borrowing short-term cash
at any one point in time. 
Page 108

Page 109

Appendix 3 – Prudential Indicators 
PRUDENTIAL INDICATOR 2024-25 2024-25 2025-26 2026-27
(1).  EXTRACT FROM BUDGET
Forecast
Outturn
Original
Estimate
Forecast
Outturn
Forecast
Outturn
Capital Expenditure £'000 £'000 £'000 £'000
Non - HRA 40,283 43,320 35,016 24,270
TOTAL 40,283 43,320 35,016 24,270
Ratio of financing costs to net revenue stream
Non - HRA 4.54% 4.36% 4.44% 4.49%
Net borrowing requirement
brought forward 1 April * 332,394 320,025 360,485 382,575
carried forward 31 March * 360,485 351,041 382,575 393,039
in year borrowing requirement 28,091 31,016 22,090 10,464
In year Capital Financing Requirement
Non - HRA 28,091 31,016 22,090 10,464
TOTAL 28,091 31,016 22,090 10,464
Capital Financing Requirement as at 31 March    
Non - HRA 360,485 351,041 382,575 393,039
TOTAL 360,485 351,041 382,575 393,039
Page 109

Page 110

PRUDENTIAL INDICATOR 2024-25 2025-26 2026-27
(2).  TREASURY MANAGEMENT PRUDENTIAL INDICATORS £'M £'M £'M
Authorised limit for external debt -    
borrowing 251 280 288
other long term liabilities 109 109 104
TOTAL 360 389 392
Operational boundary for external debt -     
borrowing 246 275 283
other long term liabilities 106 106 101
TOTAL 352 381 384
Upper limit for fixed interest rate exposure
Principal re fixed rate borrowing 190% 190% 190%
Upper limit for variable rate exposure
Principal re variable rate borrowing 60% 60% 60%
Upper limit for total principal sums invested for over 364 days £20m £20m £20m
(per maturity date)
Maturity structure of new fixed rate borrowing during 2024/25 upper limit lower limit
under 12 months 30% 0%
12 months and within 24 months 30% 0%
24 months and within 5 years 30% 0%
5 years and within 10 years 40% 0%
10 years and above 100% 0%
Page 110

Page 111

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 15 AUGUST 2024
RESERVES AND BALANCES – UPDATE AS AT 30 JUNE 2024 
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to advise Members of the overall level of
reserves held by the Council as well as providing detail on the monitoring of the
earmarked balances held within the General Fund. 
1.2 The Council has a total of £689.113m unusable reserves that are not backed with
resources. They are required purely for accounting purposes. 
1.3 At 31 March 2024 the Council had a total of £121.701m of usable reserves. Of this:
• £2.763m relates to the Repairs and Renewals Fund
• £3.197m relates to Capital Funds
• £115.741m was held in the General Fund, with £107.443m of this balance
earmarked for specific purposes.
1.4 At the budget setting meeting on 22 February 2024, as part of the revenue budget,
Council agreed to the transfer Strathclyde Pension Fund contribution savings of
£6.875m relating to Council staff and £3.053m relating to Social Work staff to
reserves.  It was also agreed that £1.875m of revenue surplus within 2024-25 be
transferred to the Capital Plan.  As the commitments for these include expenditure
within 2024-25 year, these have been immediately recognised within the
earmarked reserves balances to allow them to be spent accordingly.  This results
in a total in-year earmarked balance of £119.246m. 
1.5 Of the earmarked balance of £119.246m: 
• £60.078m is invested or committed for major initiatives/capital projects 
• £28.359m is still to be drawn down in 2024-25
• £30.809m is planned to be spent in future years 
1.6 The Council’s General Fund contingency level is set at 2% of net expenditure for
2024-25 which equates to £6.039m.  At the beginning of the financial year there
was £2.259m of unallocated General Fund Balance (over and above contingency). 
After taking into consideration the current forecast outturn for 2024-25 and
assuming Members agree to the proposed actions regarding the weather event, is
estimated to have a £1.816m surplus over contingency. 
Page 111

Page 112

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 15 AUGUST 2024
RESERVES AND BALANCES - UPDATE AS AT 30 JUNE 2024 
2. INTRODUCTION 
2.1 This report outlines current balances on the Council’s reserves, both usable and
unusable. It also provides detail on the monitoring of the earmarked balances
within the General Fund.   
3. DETAIL 
3.1 Types of Reserves 
3.1.1 Usable Reserves - Councils have powers to establish certain resource backed
reserves which can be used to fund expenditure.  The powers of councils to
establish reserves are laid out in Schedule 3 of the Local Government
(Scotland) Act 1975.  These allow councils to establish a Renewal and Repairs
Fund, Insurance Fund and Capital Fund. Councils can also establish a Useable
Capital Receipts Reserve.  The Council must also maintain a General Fund and
can earmark balances for specific purposes within the General Fund. 
3.1.2 Unusable Reserves – Councils are also required to establish certain reserves
that are not backed by resources. They are required purely for accounting
purposes and do not represent resources available for councils to utilise. The
Pensions Reserve, Revaluation Reserve, Capital Adjustment Account, Financial
Instruments Adjustment Account and Accumulated Absences Account are
examples of unusable reserves. 
3.2 Reserve Balances at 31 March 2024 
3.2.1 The balances on each type of reserve at 31 March 2024 are set out in the two
tables below, per the Unaudited Accounts for 2023-24. 
Unusable Reserves £000
Revaluation Reserve 180,661
Capital Adjustment Account 249,093
Financial Instruments Adjustment Account (1,585)
Pensions Reserve 269,216
Accumulated Absences Account (8,272)
Total Unusable Reserves 689,113 
Usable Reserves £000
Repairs and Renewals Fund 2,763
Capital Fund and Usable Capital Receipts Reserve 3,197                                                                                                                
General Fund  115,741
Total Usable Reserves  121,701
Total Reserves  810,814 
Page 112

Page 113

3.2.2 The Revaluation Reserve represents the unrealised gains in the valuation of
fixed assets. The Capital Adjustment Account represents the difference
between depreciation based on proper accounting practice and statutory
charges for financing capital expenditure. The Financial Instruments Adjustment
Account represents the difference between gains and losses on borrowing and
statutory capital financing charges. The Pensions Reserve represents the
difference between pension costs based on proper accounting practice and
payments made for pension costs. The Accumulated Absences Account
represents the costed difference between holiday pay entitlement and actual
holidays taken at 31 March. 
3.2.3 The Repairs and Renewals Fund was established to support funding of renewal
and replacement of school equipment.  Schools can only draw on the Repairs
and Renewals Fund to the extent they have previously paid into the Fund and
contributions must be contained within schools devolved budgets. 
3.2.4 The Capital Fund was established to receive all capital receipts generated by
the Council and can be used to support the capital plan or meet the principal
repayments on loan charges. The Council decides as part of the budget
process each year how it wishes to draw funding from the Capital Fund. 
3.2.5 The Usable Capital Receipts Reserve relates to the accumulated unspent
capital receipts from sale of council houses prior to transfer of the housing
stock. The reserve forms part of the Council’s Strategic Housing Fund and can
only be used for investment in social housing. The reserve will be used in
accordance with the approach to investing in housing agreed by the Council in
August 2012. 
3.3 General Fund 
3.3.1 The General Fund balance at 31 March 2024 can be analysed as follows: 
Balance
31/03/24
£000
Balance on General Fund as at 31 March 2023 86,356
Increase to General Fund balance at end of 2023-24 29,385
Earmarked Balances* (107,443)
Contingency allowance at 2% of net expenditure (6,039)
Unallocated balance as at 31 March 2024 2,259 
* Note that the earmarked balance of £107.443m includes £35.658m of new
earmarked reserves relating to the Service Concessions gain as detailed at
paragraph 3.6. 
3.3.2 The General Fund includes balances that the Council has agreed to earmark for
specific purposes. Some of these earmarked balances will be spent during the
current financial year and some of them will be held over and spent in later
years. The table below shows the balance at 31 March 2024, the new amounts
earmarked from the Strathclyde Pension Fund savings (see section 3.7), the 
Page 113

Page 114

amount from the revenue budget for Capital agreed at Council in February
2024, the amounts that are currently invested or set aside for major initiatives,
the amount already spent and planned to be spent in the current year, the
amount to be spent in future years and any sums no longer required to be
earmarked. Appendix 1 provides further details on the breakdown of unspent
budget earmarkings.  Officers have reviewed and updated the spending
profiles. 
3.4 Unallocated General Fund Balance 
3.4.1  The Council’s General Fund contingency is set at 2% of net expenditure for
2024-25 and amounts to £6.039m.  At the beginning of the financial year there
was £2.259m of unallocated General Fund Balance (over and above
contingency).   After taking into consideration the current forecast outturn for
2024-25 and assuming Members agree to the proposed actions regarding the
weather event, is estimated to have a £1.816m surplus over contingency. 
Earmarking
Category
Balance
31/03/2024 -
per year
end
published
report
New
Earmarkings
in year
Invested or
committed
for major
initiatives
/capital
projects
Drawn-
down to
2024-25
Budget as
at 30/06/24
Still to be
drawn-
down in
2024-25
Planned
Spend
Future
Years
Released to
General
Fund
£000 £000 £000 £000 £000 £000 £000
Strategic Housing
Fund 8,765 8,765
Investment in
Affordable
Housing
3,024 3,024
Capital Projects 37,958 37,958
Lochgilphead and
Tarbert
Regeneration
1,050 1,050
Support for Rural
Growth Deal 541 541
Piers and
Harbours
Investment Fund
4,125 4,125
Scottish
Government
Initiatives
2,779 1,185 1,594
CHORD 409 409
DMR Schools 739 739
Energy Efficiency
Fund 238 238
Unspent Grant 15,786 1,699 9,132 4,955
Unspent Third
Party Contribution 454 220 234
Previous Council
Decision - Other 4,140 1,470 1,232 1,438
Redundancy
Provision 2,963 150 2,813
Connect for
Success Fund 681 406 275
Fleet - Timing
Delay 484 484
Hermitage Park 56 10 46
Priorities
Investment Fund 4,742 4,742
Unspent Budget 18,509 11,803 1,446 14,563 14,303
Totals 107,443 11,803 60,078 0 28,359 30,809 0
Page 114

Page 115

3.4.2 The revenue budget position as at 30 June 2024 was estimated to be a
£4.658m overspend, of which £0.648m relates to Social Work. 
3.4.3 Social Work, as a part of the Integrated Joint Board (IJB), are able to hold any
surplus within reserves therefore it is expected that any underspend that
materialises would be transferred to the IJB reserves and the General Fund of
the Council would not be impacted.    
3.4.4 The table below summarises the position of the unallocated General Fund
balance taking into consideration the points noted above. 
Heading Detail £000
Unallocated General Fund
as at 31 March 2024
This is the balance that is
unallocated over and above the 2%
contingency, which amounts to
£6.039m
2,259
Current Forecast Outturn
for 2024-25 as at 30 June
2024
Per paragraph 3.4.2.  (4,658)
Social Work outturn
adjustment
Per paragraph 3.4.3 - Social Work
would expect to transfer any surplus
to internal IJB reserves
648
Sub-total – potential
unallocated balance as
at 31 March 2025
*If no separate action is taken
regarding the weather event
overspend, the unallocated
general fund balance would fall
below 0
(1,751)
Options to pay for weather
related incident
Members have been presented with
options to cover the pressures
resulting from the weather incident
3,567
Estimated Unallocated
balance as at 31 March
2025 
1,816 
* If Members do not agree to the options outlined in the separate report and the
unallocated general fund balance falls below the amount available and moves
into contingency then a recovery plan would be required to bring the contingency
level back up to the agreed amount. 
3.5 Loans Fund Review 
3.5.1 At the Council meeting on 27 February 2020, it was agreed that the one-off re-
profiling gain of £20.561m generated by the loans fund review should be used
partly to create a provision for the increasing principal repayments over the next
10 years (£7.649m) with the remainder of the gain (£12.912m) used to fund
known liabilities/cost pressures. The £12.912m has now been transferred to
Earmarked Reserves in full. 
Page 115

Page 116

3.6 Service Concessions 
3.6.1 At the Council meeting on 23 February 2023 it was agreed that the Council adopt
the financial flexibility introduced by the Scottish Government relating to Service
Concession contracts. This resulted in a one-off retrospective gain of £36.038m. 
The commitments associated with this were further refined at the Council meeting
on 22 February 2024 and it was agreed that £0.380m be transferred into the
general fund balance, leaving a one-off gain of £35.658m which now being held
in earmarked reserves.  Appendix 2 provides information on these commitments.  
3.7 Strathclyde Pension Fund Reserves 
3.7.1 The Strathclyde Pension Fund reported an exceptionally strong set of results with
a surplus of almost £9bn which has allowed a reduction in the employer
contribution rate.  Argyll and Bute Council is seeing a reduction in employer
contributions from 19.3% to 6.5% over 2024-25 and 2025-26, before reverting to
a sustainable long-term rate in the third year of 17.5%.  For the Council, the one-
off saving in the first two years associated with a reduction to 6.5% is £6.875m
per year.  On 22 February 2024, Council agreed to allocate the cumulative gain
in the first two years of £13.750m as follows: 
Description 2024-25
£000
2025-26
£000
Total
£000
Realised saving 6,875 6,875 13,750
£2m in 24-25 to balance revenue budget (2,000)  (2,000)
£3.750m allocation to capital plan (3,750)  (3,750)
£2m to be directed towards
transformation projects (1,125) (875) (2,000)
£2m in 25-26 to balance revenue budget  (2,000) (2,000)
£2m in 26-27 to balance revenue budget  (2,000) (2,000)
£2m allocation to capital plan  (2,000) (2,000) 
0 0 0 
3.7.2 The £6.875m from the 2024-25 revenue budget saving has been logged within
the earmarkings with the commitments noted above to allow expenditure to be
made against them. 
3.7.3 For Social Work, the SPF saving is £3.053m per annum and is being ring fenced
within the Council reserves for utilisation by the HSCP in the future.  This amount
is also being logged with the earmarkings in 2024-25 to allow expenditure to be
made if required.   
4. CONCLUSION 
4.1 The report outlines the overall reserves and balances for the Council covering
the purpose and level of each reserve.  It also provides detail as to expenditure
against earmarked balances held within the General Fund.   
4.2 As at 30 June 2024 the estimated unallocated General Fund, after taking into
consideration the current forecast outturn for 2024-25 and assuming Members
agree to the proposed actions regarding the weather event, is estimated to
have a £1.816m surplus over contingency.
Page 116

Page 117

5. IMPLICATIONS 
5.1 Policy - Earmarked funds and funds set aside for delivery of
Single Outcome Agreement are available to support
Council Policy.
5.2 Financial -  Outlines the balances held with the Council’s usable
and unusable reserves.     
5.3 Legal -  None.
5.4 HR -  None.
5.5 Fairer Scotland Duty- None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty -  None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  A contingency of £6.039m (equivalent to 2% of net
expenditure) has been set aside as part of the
general fund.  This has been subject to a risk
assessment. 
5.8 Customer Service -  None. 
5.9 The Rights of the Child
(UNCRC) - 
None. 
Kirsty Flanagan
Executive Director/Section 95 Officer 
6 August 2024 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
APPENDICES
Appendix 1 – Earmarked Reserves breakdown of unspent budget
Appendix 2 – Earmarked Reserves breakdown of Service Concessions earmarkings 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 117

Page 118

APPENDIX 1
Earmarked Reserves - Unspent Budget (Including Service Concessions)
As at 30 June 2024
Ref Department Service Description Opening
Balance
Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount Planned
to be Spent from
2026/27 onwards
001 Chief Executive's Unit Community
Planning
Service Concessions - Priorities Investment
Fund (Area Plans)
200,000 200,000 100,000 100,000 As agreed by Policy and Resources Committee on 23 October 23 - drawdown of
£200,000 from the Priorities Investment Fund to fund two temporary posts and
associated costs to produce meaningful area plans
100,000 100,000 0
002 Chief Executive's Unit Community
Planning
Communities and Partnership Team 8,855 8,855 8,855 0 The funds have originated from externally sourced income due to an employee
being seconded to the Scottish Community Development Centre (SCDC).  The funds
will be used to support the team in relation to meeting its priorities of Building Back
Better (Communities), Climate Change and the review of the Argyll and Bute
Outcome Improvement Plan.
8,855 0 0
003 Executive Director (Douglas
Hendry)
Across Services /
Commercial
Services
Information Management (Estates Survey
Work)
12,697 12,697 12,697 0 To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of
change as outlined in the BV Review.  The planned initiatives include: Estates Survey
work £122k, Digitalisation of Title Deeds £92k, document management and
workflow system for Planning, Building Standards and Environmental Health £77k
and a balance of funding to explore information management solutions in a strategic
and coherent way £209k. This balance relates to Estates Survey Work. Having a
procured supplier to provide floor plans at short notice is required to be able to
react quickly to requests. If this isn't available Estates would need to go through the
procurement process again which would delay any projects by several months.
There isn’t a detailed plan to use this resource it is more about being able to react
quickly and not delay projects.
12,697 0 0
004 Executive Director (Douglas
Hendry)
Across Services /
Education
Digital Projects (Supply Staff Booking
System)
15,200 15,200 9,900 5,300 To deliver a number of Digital Service Transformation Projects with a commitment
of £0.035m towards a Supply Staff Booking system.  Phase 1 of the project is nearing
completion.
9,900 5,300 0
005 Executive Director (Douglas
Hendry)
Commercial
Services
Rothesay Pavilion Charity 750,000 750,000 0 750,000 Agreed at Council meeting February 2020, £750k additional revenue support subject
to conditions which seek to minimise the risk to the Council as far as is reasonably
practicable including requirement for adequate business and financial management
and regular reporting by RPC.  This funding is to support Rothesay Pavilion Charity in
the first 2 years of the building being operational.
0 750,000 0
006 Executive Director (Douglas
Hendry)
Commercial
Services
Rothesay Pavilion Essential repairs 306,400 306,400 0 306,400 Essential repairs to deal with potential health and safety risks and to avoid further
deterioration.  Budget provision was approved by the Policy and Resources
Committee on 21 August 2014.  
0 306,400 0
007 Executive Director (Douglas
Hendry)
Commercial
Services
Commercial Investment Manager post and
specialist consultant technical resource
(previously Asset Management Fund)
104,000 104,000 104,000 0 The Asset Management Fund has been redirected to Capital going forward but the
interest for 2023-24 is to be used towards a Commercial Investment Manager Post. 
This is because funding of £200k from the Asset Management Fund was agreed at
ELT in June 22 for the post, along with specialist consultancy and technical resources 
that will be required to support early projects.  Note, the  £104k represents the
balance of the £200k commitment.
104,000 0 0
008 Executive Director (Douglas
Hendry)
Commercial
Services
Estates - NDR Revaluation Appeals 59,938 59,938 29,969 29,969 The Council agreed to make provision to meet the cost of appealing Non Domestic
Rates (NDR) revaluations which were imposed from April 2017. The remaining funds
were carried forward to the 2023/24 revaluation cycle however a recent change in
position by the Scottish Government may restrict the appeals which can be made.
This is still under discussion and Gerald Eve Surveyors have been appointed as
specialist advisers on this matter, who are progressing 2023-26 appeals. In the event
that appeals are limited there may be an opportunity to utilise Gerald Eve for more
general valuation advice subject to Procurement approval.
29,969 29,969 0
009 Executive Director (Douglas
Hendry)
Commercial
Services
Mid Argyll Community Pool 30,000 30,000 30,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.030m to Mid Argyll Community Pool in response to an external
funding request.
30,000 0 0
010 Executive Director (Douglas
Hendry)
Commercial
Services
MacTaggart Leisure Islay 30,000 30,000 30,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.030m to MacTaggart Leisure, Islay in response to an external
funding request.
30,000 0 0
011 Executive Director (Douglas
Hendry)
Commercial
Services
Site Investigation Works 21,013 21,013 21,013 0 For Site Investigation works in relation to Tweeddale Street Car Park and Oban
Airport Business Park, exploring commercial opportunities to develop the sites and
raise revenue income for Argyll and Bute Council. HUB North were instructed to
procure contractors to undertake the site investigations these are now complete.
The remainder of the budget is intended to be utilised for other site investigation
and pre-development works to further develop commercial opportunities across the
council area.
21,013 0 0
Page 118

Page 119

Ref Department Service Description Opening
Balance
Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount Planned
to be Spent from
2026/27 onwards
012 Executive Director (Douglas
Hendry)
Education ASN Review 1,255,000 1,255,000 565,000 690,000 To fund capital costs of ASN adaptations as part of ASN Review to increase equity of
provision across Argyll and Bute.  This will be subject to a business case as part of
the wider ASN review. Update: Business case now approved and working group set
up with quotes for works being carried out Jan 2024.
565,000 690,000 0
013 Executive Director (Douglas
Hendry)
Education Reduced Teacher Staffing Costs - Strike
Action
800,000 800,000 800,000 0 To fund one off savings in 2024-25 from the underspend in staffing from strike
action.
800,000 0 0
014 Executive Director (Douglas
Hendry)
Education (2023 Digital Projects) School WiFi
Upgrades
166,924 166,924 166,924 0 To extend WiFi coverage within school settings through the purchase of additional
hardware such as access points, switches and other networking hardware. This will
result in more flexible learning spaces and support the growing number of devices
within schools. Project now underway and if budget not fully utilised it is hoped that
the balance could be diverted to assist with Capital costs of Education Network
Paper.
166,924 0 0
015 Executive Director (Douglas
Hendry)
Education Education Transformation Fund 144,637 144,637 0 144,637 At the Council meeting on 27 February 2020, it was agreed to input £400k into
Education Digital Learning.  The additional funds have been spent in 20/21, 21/22
and 22/23 as part of the ongoing transformation work in the Education service,
focussing on digital and virtual learning technology and the development of learning
clusters. 
0 144,637 0
016 Executive Director (Douglas
Hendry)
Education MCR Pathways Pilot 80,000 80,000 80,000 0 Funding to support implementation of MCR Pathways mentoring programme within
three secondary schools for 2023-24 academic year. Funding will allow the
employment of a dedicated Co-ordinator within each setting to develop and
implement the programme which is designed to benefit care experienced and other
disadvantaged pupils through targeted mentoring support.
80,000 0 0
017 Executive Director (Douglas
Hendry)
Education Gaelic Specific Grant 30,000 30,000 30,000 0 Gaellic Specific Grant £30k - This earmarking refers to the Council contribution
towards the Gaelic grant for 22-23 and will fund the costs of Gaelic Language
Principal Teacher in 24-25 academic year.
30,000 0 0
018 Executive Director (Douglas
Hendry)
Education (2023 Digital Projects) Cashless Catering 30,000 30,000 10,000 20,000 To support the ongoing implementation of the new cashless catering system during
the testing and roll out phase.
10,000 0 20,000
019 Executive Director (Douglas
Hendry)
Education Skype for Business for Education / Digital
Projects (Skype for Business)
10,000 10,000 0 10,000 To fund the initial capital costs for the implementation of Skype for Business for
Education.  This will bring the Education service in line with other council
departments and will improve staff collaboration and modernise school telephony
to deliver the  service more efficiently and cost effectively.
0 10,000 0
020 Executive Director (Douglas
Hendry)
Education Education Learning Estate Condition
Surveys
1,815 1,815 0 1,815 To fund the delivery of School Core Facts (SCF) compliant Condition Surveys for
prioritised School Buildings.
0 0 1,815
021 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Education Purchasing Officers 210,000 210,000 168,000 42,000 The earmarked funds will be used to fund an education purchasing team within the
Procurement Service for two years.  The team will embed good procurement
practice, train headteachers on current procurement process requirements, develop
spend plans that evidence best value.
168,000 42,000 0
022 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Information Management (Digitalisation of
Title Deeds)
92,000 92,000 20,500 71,500 To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of
change as outlined in the BV Review.  The planned initiatives include: Estates Survey
work £122k, Digitalisation of Title Deeds £92k (delay on spending due to COVID-19),
document management and workflow system for Planning, Building Standards and
Environmental Health £77k and a balance of funding to explore information
management solutions in a strategic and coherent way £209k
20,500 51,000 20,500
023 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
(2023 Digital Projects) Replacement of
Council Chambers Online Meeting
Equipment
50,071 50,071 5,353 44,718 Current online meeting system  is less than resilient and has failed on a number of
occasions, leading to issues at strategic committees. A condition assessment by the
incumbent maintenance contractor has highlighted that the current equipment is
now at end of life and unsupportable due to the  obsolescence of the system.
Discussions with ICT have taken place to identify a simpler more robust solution to
be procured.
NUWAY system and maintenance, system installed, ongoing maintenance contract
to 2030
5,353 44,718 0
024 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Councillor IT Equipment 44,557 44,557 22,000 22,557 There is currently no budget for the provision and renewal of IT equipment for
members. The earmarking identifies a resource to utilise spend for that purpose to
ensure that members have continued support in maintaining and replacing vital IT
equipment.
22,000 22,557 0
025 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Digital Projects: Hybrid Council meetings 43,302 43,302 12,000 31,302 The funding will be used to maintain the ICT equipment used to support the
provision of on-line and hybrid Council meetings.  Will be used to fund Public-I
licence over 3 years - for livestreaming Council meetings.
12,000 0 31,302
026 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Debt Counselling & Welfare Rights 21,452 21,452 6,000 15,452 To meet the cost of a Debt Counselling and Welfare Rights Management System. 6,000 0 15,452
Page 119

Page 120

Ref Department Service Description Opening
Balance
Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount Planned
to be Spent from
2026/27 onwards
027 Executive Director (Douglas
Hendry)
Non
Departmental /
Legal and
Regulatory
Services
Community Resilience Fund 71,999 71,999 5,000 66,999 Fund established in 2012/13 to be spent over more than one year. Fund reduced at
the Council meeting on 11 February 2016.  Used to cover the costs of emergency
phone lines and a contract with Aggreko for generators if required in an Emergency
Planning/Civil contingencies incident.  These costs amount to approximately £5k per
year.
5,000 0 66,999
028 Executive Director (Kirsty Flanagan) Across Services /
Customer Support
Services
Digital Projects (Increase in Schools
Bandwidth)
63,455 63,455 0 63,455 To complete one of a number of Digital Service Transformation projects with a
commitment of £0.064m to increase Schools Bandwidth. 
0 0 63,455
029 Executive Director (Kirsty Flanagan) Across Services /
Customer Support
Services
Digital Projects (Replacement Learning
Management System)
11,470 11,470 11,470 0 To deliver a number of Digital Service Transformation Projects with an original
commitment of £0.030m towards a replacement Learning Management System
£0.030m.  This money will be used to pay for consultancy for an interface between
itrent and totara. Profiled for 24/25 based on decision to do a phased
implementation of itrent.
11,470 0 0
030 Executive Director (Kirsty Flanagan) Across Services /
Development and
Economic Growth
Information Management (Document
Management and Workflow for Planning,
Building Standards and Environmental
Health)
21,177 21,177 21,177 0 Hoping to implement the replacement for IDOX in March 2024 but there have been
severe issues/delays with the new programme
21,177 0 0
031 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) iTrent Project 320,555 320,555 320,555 0 Combination of parallel running of the new iTrent system alongside the legacy
systems for up to 18 months whilst iTrent is implemented and additional staffing
resource to implement iTrent in late June 2024 and support staff for the first 3
months of operation through summer 2024. Total includes £73k from Financial
services for funding additional staffing resource to implement the payroll
components of the iTrent HR and Payroll System by the end of June 2024 and
support staff for the first 3 months of operation during summer 2024.
320,555 0 0
032 Executive Director (Kirsty Flanagan) Customer Support
Services
Growing our Own and Modern Apprentices 109,150 109,150 44,000 65,150 Funding earmarked to support trainee development and modern apprenticeship
opportunities based on priority workforce risk areas.  A Trainee Regulatory Services
post has been proposed by the manager who was unable to secure a suitable
candidate for the original advert. The spend would be spread over 24/25 and 25/26
once a suitable candidate is in post
44,000 25,150 40,000
033 Executive Director (Kirsty Flanagan) Customer Support
Services
Security Operations Centre Subscription 71,188 71,188 0 71,188 There is a requirement to pay for a 3-year subscription at £60,000 per annum with a
cost pressure being added to the ICT revenue budget to cover the costs from 2026-
27 onwards. 
0 71,188 0
034 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Resilient Website
Project
60,000 60,000 60,000 0 Cybersecurity action to move to a cloud based website platform that would improve
resilience and enable service continuity in the event of a cyber attack.  Procurement
in progress for resilient website solution and Scotgov Cloud Services Project
providing input. Contract Award expected by end 2023. Procurement in progress for
resilient website solution.   Contract Award expected FQ1 2024-5 and full £60k
spend in that year. Payment milestones in CARR will be 25% on Contract Award, 25%
on Cloud Site Provisioning, 25% on Site migration and 25% on full go live cutover.
60,000 0 0
035 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Digital Project
Officer
34,121 34,121 34,121 0 Employ a temporary Digital Project Officer as part of OD changes - additional
member of staff required to action changes, unable to recruit so existing staff
increasing hours.
34,121 0 0
036 Executive Director (Kirsty Flanagan) Customer Support
Services
Implementation of Gaelic Language Plan 30,000 30,000 10,000 20,000 Agreed at Council Meeting February 2021.  Provision of funding for delivery and
implementation of the council’s Gaelic Language Plan in recognition of the
contribution that Gaelic makes to economic growth and to the tourism sector, and
to enable delivery of key activities within the plan which currently receive no
revenue funding.  In discussion with Bord na Gaidhlig about a 3-year Gaelic Plan
funding programme as opposed to individual grant applications for specific projects.
This earmarking would be used to provide match funding for that 3 year programme
of projects.
10,000 20,000 0
037 Executive Director (Kirsty Flanagan) Customer Support
Services
Business Development Training 27,025 27,025 10,000 17,025 £27k budget from original Business Development Training earmarking remaining at
31/03/24.  This budget is funding ongoing leadership development, coaching, action
learning sets and commissioned training including Priority Management.
10,000 17,025 0
038 Executive Director (Kirsty Flanagan) Customer Support
Services
Learning and Development 19,436 19,436 10,000 9,436 In order to maximise the opportunities and efficiencies of digital learning, this
funding will be used to support the extension of digital learning in order to deliver
the Digital Learning Strategy, which was approved in FQ4 20/21. This money is to
support the additional digital learning capacity required to build online elements of
AB365 and other key digital learning as we increase our digital learning offering
linked to the digital skills survey and review of corporate training. Delays in
recruitment meant this has been reprofiled for spend in 24/25
10,000 9,436 0
039 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Digital Engagement
Services Developer
15,677 15,677 15,677 0 To fund 50% of a new temporary LGE10 post.  The post is a Digital Engagement
Services Developer that will be provide capacity to deliver service efficiencies
through the use of the  new CREATE/RPA software.  The other 50% of the post can
be funded from a current vacancy. 
15,677 0 0
Page 120

Page 121

Ref Department Service Description Opening
Balance
Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount Planned
to be Spent from
2026/27 onwards
040 Executive Director (Kirsty Flanagan) Customer Support
Services
Establishing HR Service Centre 13,824 13,824 13,824 0 To facilitate the implementation of technical efficiency improvements and new
processes.  This money will be used to support phase two of the itrent project. 
Spend reprofiled for 2024/25 following delays in itrent project.
13,824 0 0
041 Executive Director (Kirsty Flanagan) Development &
Economic Growth
Planning Income 60,000 60,000 60,000 0 To fund additional resources to support and develop the Council's planning service. 
Whilst recruitment issues within Argyll and Bute were largely been resolved during
2022/23, the requirement for the operation of the DM Service with reduced staffing
levels over an extended period of time, coupled with the increasing demand for
development post-Covid, and uncertainty caused by the introduction of National
Planning Framework 4 has given rise to a substantial backlog of case work and has
had a significant adverse impact on processing times for planning applications.
Plans to utilise this on additional staff costs in 24-25 in order to reduce the backlog.
60,000 0 0
042 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Oban TIF (Tax Incremental Financing) 214,158 214,158 214,158 0 Will be used to fund the TIF Programme office for a further 3 years as well as the
programme office for Rural Growth Deal beyond the funding that was agreed at
Council for this in February 2021.
214,158 0 0
043 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Service Concessions - Priorities Investment
Fund (Project Officer for Housing
Emergency)
200,000 200,000 70,000 130,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£200,000 from the Priorities Investment Fund to fund a Project Officer to assist in
accelerating the work of the Housing Emergency.
70,000 130,000 0
044 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Strategic Events & Festivals 41,260 41,260 41,260 0 At the Council meeting on 25 February 21, a decision was taken to agree £90k
funding for Events and Festivals for 22/23, in order that the application process can
commence during 21/22 and that this agreed figure be augmented by any
underspend remaining from the 20/21 financial year.  At 24 February 22, decision
made to agree £90k for 23/24, in order that the application process can commence
during 22/23 and that this agreed figure be augmented by any underspend
remaining from the 21/22 financial year.  Applications have been received and
payments will be made in 23-24. Final balance (£41,260) to be spent in 24/25
41,260 0 0
045 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Screen Machine 28,000 28,000 28,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.028m to Screen Machine in response to an external funding
request.
28,000 0 0
046 Executive Director (Kirsty Flanagan) Development and
Economic Growth
International Eight Metre Association
World Cup
10,000 10,000 10,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.010m to the International Eight Metre World Cup in response
to an external funding request.
10,000 0 0
047 Executive Director (Kirsty Flanagan) Financial Services Revenue and Benefits BPR  - extra staff to
implement savings targets
86,955 86,955 86,955 0 On 23 February 2023, the Council agreed to the implementation of savings option
FIS2324-002 in relation to the Revenue and Benefits - Income Generation and
Business Process Review.   This included an extra 4 FTE of staff.  Delays in
recruitment have caused slippage in the allocated budget for these posts. 
86,955 0 0
048 Executive Director (Kirsty Flanagan) Financial Services Scotland Loves Local 57,453 57,453 57,453 0 As agreed by Council 22 February 24, a £57,453 underspend from the Scotland Loves
Local scheme to be allocated to support measures to help with the costs of living by
funding member organisations of the Community Food Forum, ALI Energy, Argyll
and Bute Citizens Advice Bureau and Bute Advice Centre, with detailed proposals to
be agreed by the Executive Director with responsibility for Finance, in consultation
with the Leader, Depute Leader and Leader of the Largest Opposition Group. Details
of the agreed spend are to be reported to elected members.
57,453 0 0
049 Executive Director (Kirsty Flanagan) Financial Services Financial Systems 33,748 33,748 30,748 3,000 The council is required to implement the IFRS16 Leases accounting standard  from
the 1st April 2024.
30,748 0 3,000
050 Executive Director (Kirsty Flanagan) Financial Services Accounting and Budgeting Team Resilience 47,883 47,883 8,000 39,883 Training and examination fees for 6 staff who are currently undertaking their
professional CIPFA/ACCA training.  In addition funding the further training of 1 of our
auditors and providing finance business partner training to a group of our existing
professional staff.
8,000 8,000 31,883
051 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Waste Variation Monies 1,241,752 1,241,752 569,752 672,000 Waste Variation Monies - £1.242m balance at 31/03/24: This will be used to
fund/part-fund various waste infrastructure projects that will support the council’s
compliance with the 2026 ban on the Landfill of Biodegradable Municipal Waste.
£570K in 2024-25 consisting of :- Island restoration/capping, Helensburgh transfer
station and recycling improve. fund (island sites) design costs, technology trial on
blue bin recycling participation, consultancy costs relating to additional monitoring
data for SEPA and waste PPP site conversion.
£672K in 2025-26  consisting of:- Island restoration/capping, Helensburgh transfer
station design costs during construction, consultancy costs relating to additional
monitoring data for SEPA and waste PPP site conversion.
569,752 672,000 0
Page 121

Page 122

Ref Department Service Description Opening
Balance
Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount Planned
to be Spent from
2026/27 onwards
052 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Service Concessions - Priorities Investment
Fund (Strategic Development Framework)
450,000 450,000 225,000 225,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£450,000 to procure consultancy support to assist in driving forward the Strategic
Development Frameworks.
225,000 225,000 0
053 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
3G pitches / Tarbert Sports Pitches 287,835 287,835 83,883 203,952 In November 2018, the Council agreed to a maintenance funding package to be
progressed for a number of 3G pitches including Tarbert. This funding will provide
an estimated 6.5 years’ worth of ongoing maintenance up to 2025-26. There is the
potential to extend the continued upkeep of the pitches until 2026-27 given the
earmarking available will not be fully utilised by the end of 2025-26.  However, there
will be potential redundancy costs for 2 employees that will need to be covered
from the remaining balance. Paper on proposed extension to be prepared.
83,883 203,952 0
054 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Green Transport Initiatives 140,000 140,000 140,000 0 At the Council meeting on 27 February 2020, it was agreed to input £400k in Green
transport, investment in footway and cycle path maintenance supporting the
healthy wellbeing and green agenda.  Spend has been delayed due to COVID and
this will be taken forward in 23/24. £260k Footways Reconstruction programme now
spent and will be drawn down against capital programme during 23/24. £140k
Ardrishaig North Project spent in 22/23 and drawn down in 24/25 (capital
expenditure).
140,000 0 0
055 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Climate Change 40,942 40,942 40,942 0 At the Council meeting on 27 February 2020, it was agreed to input £500k budget to
mitigate the impacts of weather related damage and climate change with specific
emphasis on gully cleaning and drainage improvements.  Spend has been delayed
due to COVID and the intention is to spend the funds on 2 Gully Motors plus staff
over next 2 years. Vehicles have been received and budget will be drawn down to
cover their cost. The remaining budget will be used towards running the vehicles.
40,942 0 0
056 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Amenity Services introduction of
management information system
28,099 28,099 0 28,099 Delay with introduction of amenity time recording system due to increased costs. 
Discussions ongoing to find alternative cheaper solution.  The software/system
being introduced by HR/Payroll during 2023-24 offers a time-recording facility. 
Although not included in the current HR/Payroll spec, once the new system is up and
running, the proposal would be to investigate the time-recording system to see if
viable for amenity time recording purposes.
0 0 28,099
057 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Services
(2023 Contract Inflation Adjustments)
Waste PPP
223,261 223,261 223,261 0 Contract Inflation adjustments - £0.223m balance at 31/03/24.  Adjustment to
inflation included in the budget based on updated RPIX figures at February 2023. 
Based on actuals in 23-24, only £32k of this was required leaving a balance of £223k.
223,261 0 0
058 Executive Director (Kirsty Flanagan) Roads and
Infrastructure
Services
Weather Incident costs not covered by
Bellwin claim.
198,000 198,000 198,000 0 £839k was set aside at budget meeting in February 2024 as part of the unallocated
general fund balance workings to cover the weather incident costs not covered by
the Bellwin Claim.  As £641k was utilised during 23-24, the balance of £0.198m is
being earmarked for costs expected in 24-25.
198,000 0 0
059 Non Departmental Non
Departmental
Service Concessions - Replace previous
loans fund principal repayment holiday
5,400,000 5,400,000 5,400,000 0 As agreed at Council meeting 23 February 2023 - The one-off retrospective benefit
will be used to replace exercising the principal repayment holiday that was
previously agreed by Council.
5,400,000 0 0
060 Non Departmental Non
Departmental
Pay Inflation Contingency 1,700,000 1,700,000 1,700,000 0 Negotiations for the 2024/25 pay award are ongoing but initial discussions suggest it
will be beyond the 3% increase currently built into the budget outlook. £1.7m
equates to approximately a 1% pay rise therefore providing a contingency at this
level is prudent
1,700,000 0 0
061 Non Departmental Non
Departmental
Underwriting development of Rothesay
Pavilion
1,000,000 1,000,000 1,000,000 0 Funding to meet additional costs identified as necessary for the refurbishment of
Rothesay Pavilion (£1m).
1,000,000 0 0
062 Non Departmental Non
Departmental
Oban TIF (Tax Incremental Financing -
Excess NDR)
875,651 875,651 0 875,651 This is the surplus NDR after paying all Loans Charges in respect of TIF infrastructure
projects.  This fund will be used in the future as TIF projects are delivered.  
Discussions in place on future ff the next TIF project (Oban Airport) which will utilise
this reserve.  If the project does not go ahead, we will need to return NDR to
Scottish Government
0 875,651 0
063 Non Departmental Non
Departmental
Treasury Gain 294,000 294,000 294,000 0 To fund one off operational saving 202425 003 as agreed by Council when setting
2024/25 budget in February 2024.
294,000 0 0
064 Non Departmental Non
Departmental
Information Management (Balance of
Funding)
200,469 200,469 200,469 0 To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of
change as outlined in the BV Review.  This was the balance of funding to explore
information management solutions in a strategic and coherent way £209k. 
Committed for MS 365 project - D Logan/I Jackson. Paper went to DMT in Dec.
200,469 0 0
Page 122

Page 123

Ref Department Service Description Opening
Balance
Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount Planned
to be Spent from
2026/27 onwards
065 Non Departmental Non
Departmental
Engagement with Hub North re provision
of services for older adults and vulnerable
people across Argyll and Bute
100,000 100,000 70,000 30,000 At the Council budget meeting February 23, an allocation of £0.1m from the
Unallocated General Fund balance for the Health and Social Care Partnership to
engage, in partnership with the Council, with Hub North to develop a strategic
business case in relation to the provision of services for older adults and other
vulnerable people across Argyll and Bute.  It is intended that this will be spent on an
on-going business case and options appraisal work with Hub and that a sizable
proportion will be spent during 24/25
70,000 30,000 0
066 Non Departmental Non
Departmental
Spend to Save Route Optimisation
Software
82,775 82,775 82,775 0 One-off re-profiling gain as a result of the loans fund review to fund known
liabilities/cost pressures as agreed at budget setting meeting in February 2020 - 
Spend to save route optimisation (£0.100m) which will be spent over  2023/24 and
2024/25.
82,775 0 0
067 Non Departmental Non
Departmental
CHARTS 80,000 80,000 80,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to
£0.075m one-off investment in CHARTS in response to an external funding request
will be spent in 24-25. There remains £0.005m from a COVID earmarking for CHARTS
as well.
80,000 0 0
068 Non Departmental Non
Departmental
Council Strathclyde Pension Fund Saving 24-
25 (£2m to balance 24-25 budget)
2,000,000 2,000,000 2,000,000 0 This is part of the revenue budget for 24-25 and is the saving on pension budgets
resulting from the drop in employers pension rate.  The total of £6.875m is split as
follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget
meeting 22 February 24 and the balance of £1.125m going towards what will be
total of £2m over the two years pot to be directed to transformation and projects
that will save revenue in the future.
2,000,000 0
069 Non Departmental Non
Departmental
Council Strathclyde Pension Fund Saving 24-
25 (£3.75m allocation to capital plan)
3,750,000 3,750,000 0 3,750,000 This is part of the revenue budget for 24-25 and is the saving on pension budgets
resulting from the drop in employers pension rate.  The total of £6.875m is split as
follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget
meeting 22 February 24 and the balance of £1.125m going towards what will be
total of £2m over the two years pot to be directed to transformation and projects
that will save revenue in the future.
0 3,750,000
070 Non Departmental Non
Departmental
Council Strathclyde Pension Fund Saving 24-
25 (£2m to be directed to transformation
and projects that will save revenue in the
future)
1,125,000 1,125,000 0 1,125,000 This is part of the revenue budget for 24-25 and is the saving on pension budgets
resulting from the drop in employers pension rate.  The total of £6.875m is split as
follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget
meeting 22 February 24 and the balance of £1.125m going towards what will be
total of £2m over the two years pot to be directed to transformation and projects
that will save revenue in the future.
1,125,000
071 Non Departmental / Social Work Non
Departmental
Social Work Strathclyde Pension Fund
Saving 24-25
3,053,000 3,053,000 0 3,053,000 This is part of the revenue budget for 24-25 and is the saving on Social Work pension
budgets resulting from the drop in employers pension rate - to be held in Council
reserves for utilisation by the HSCP in future. 
3,053,000
072 Non Departmental Non
Departmental
Capital Plan 1,875,000 1,875,000 0 1,875,000 At the budget meeting on 22 February 2024, Council agreed to transfer £1.875m
from the revenue budget over to the capital plan.
1,875,000
18,509,179 0 11,803,000 30,312,179 15,702,691 14,609,488 15,702,691 4,483,983 10,125,505
Page 123

Page 124

APPENDIX 2
Earmarked Reserves - Service Concessions
As at 30 June 2024
Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
001 Chief Executive's Unit Community
Planning
Service Concessions - Priorities Investment
Fund (Area Plans)
200,000 200,000 100,000 100,000 As agreed by Policy and Resources Committee on 23 October 23 - drawdown of
£200,000 from the Priorities Investment Fund to fund two temporary posts and
associated costs to produce meaningful area plans
100,000 100,000 0
002 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Service Concessions - Priorities Investment
Fund (Project Officer for Housing
Emergency)
200,000 200,000 70,000 130,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£200,000 from the Priorities Investment Fund to fund a Project Officer to assist in
accelerating the work of the Housing Emergency.
70,000 130,000 0
003 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Service Concessions - Biodegradable
Municipal Waste (BMW) Ban
3,500,000 3,500,000 0 3,500,000 As agreed at Council meeting 23 February 2023 - Ensuring Argyll and Bute is able to
better address the challenges faced by a remote/rural/ island region in complying
with the forthcoming national BMW ban. 
0 3,500,000 0
004 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Service Concessions - Priorities Investment
Fund (Strategic Development Framework)
450,000 450,000 225,000 225,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£450,000 to procure consultancy support to assist in driving forward the Strategic
Development Frameworks.
225,000 225,000 0
005 Non Departmental Non Departmental Service Concessions - Learning Estate
Investment Strategy
8,000,000 8,000,000 0 8,000,000 As agreed at Council meeting 23 February 2023 - Signalling council’s commitment to
working in partnership to secure new schools for Argyll and Bute, through substantial
investment to support future-proofing of Argyll and Bute’s schools estate.
0 8,000,000 0
006 Non Departmental Non Departmental Service Concessions - Replace previous
loans fund principal repayment holiday
5,400,000 5,400,000 5,400,000 0 As agreed at Council meeting 23 February 2023 - The one-off retrospective benefit
will be used to replace exercising the principal repayment holiday that was previously
agreed by Council.
5,400,000 0 0
007 Non Departmental Non Departmental Service Concessions - Rothesay Pavilion 4,772,000 4,772,000 0 4,772,000 As agreed at Council meeting 23 February 2023 - Building on previous commitments
to securing a future for this building of international, national and local significance
with additional contribution to the overall funding target which requires collective
action; helping project to progress towards success with funding that supports
completion of certain work stages and securing wind/watertight status.
0 4,772,000 0
008 Non Departmental Non Departmental Service Concessions - Priorities Investment
Fund
4,742,000 4,742,000 0 4,742,000 As agreed at Council meeting 23 February 2023 - Safeguarding future investment in
Priorities for Argyll and Bute by making long-term use of service concession gain to
establish dedicated fund to lever in, secure and support key strategic investments in
this year and future years.
0 4,742,000 0
009 Non Departmental Non Departmental Service Concessions - Roads Investment to
Capital
3,546,000 3,546,000 0 3,546,000 As agreed at Council meeting 23 February 2023 - Augmenting overall allocation for
roads repair and maintenance programme with additional funds to bring up to £8m
total investment for 2024/25.
0 3,546,000 0
010 Non Departmental Non Departmental Service Concessions - Capital Projects
Inflation Pressures
2,000,000 2,000,000 0 2,000,000 As agreed at Council meeting 23 February 2023 -Boosting resilience of Capital
Programme and providing added support as required for key capital/infrastructure
projects - £2m.
Further allocation agreed Council meeting 22 February 24 - increase capital contract
earmarking to protect current capital projects in plan £0.297m
0 2,000,000 0
011 Non Departmental Non Departmental Service Concessions - Priorities Investment
Fund (Capital Programme)
1,028,000 1,028,000 0 1,028,000 As agreed by Council on 22 February 2024- transfer of £1,028,000 from the Priorities
Investment Fund to the Capital plan
1,028,000 0
012 Non Departmental Non Departmental Service Concessions - New refuse collection
vehicles
700,000 700,000 700,000 0 As agreed at Council meeting 23 February 2023 - Enhancing waste and recycling uplift
arrangements through placing orders for new refuse vehicles.
700,000 0 0
013 Non Departmental Non Departmental Service Concessions - Climate Change 640,000 640,000 0 640,000 As agreed at Council meeting 23 February 2023 - Continuing our track record of
investing in climate change with funding to further enhance school estate climate
change measures, with allocations for primary and secondary schools across the area
in Campbeltown, Dunoon, Helensburgh, Lochgilphead, Oban and Rothesay.
0 640,000 0
014 Non Departmental Non Departmental Service Concessions - New Jet Patcher
Vehicle
250,000 250,000 250,000 0 As agreed at Council meeting 23 February 2023 - Complementing multi-million pound
capital investment in roads repair and maintenance with new jet patcher order to
support delivery of programme.
250,000 0 0
015 Non Departmental Non Departmental Service Concessions - New Road Marking
Vehicle
230,000 230,000 0 230,000 As agreed at Council meeting 23 February 2023 - Completing suite of investments in
new fleet procurement, to support delivery of roads repair and maintenance
programme, with order for additional road marking vehicle.
0 230,000 0
35,658,000 0 35,658,000 6,745,000 28,913,000 6,745,000 28,913,000 0
Page 124

Page 125

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 15 AUGUST 2024
BUDGET OUTLOOK 2025-26 TO 2029-30  
1. EXECUTIVE SUMMARY 
1.1 This report provides an update to the budget outlook covering the period 2025-
26 to 2029-30, reported to the Policy and Resources Committee on 9 May
2024. 
1.2 The estimates within the report are based on the mid-range scenario with best
and worst case scenarios noted in Appendix 1. 
1.3  The assumptions in respect of future years Scottish Government funding
remain unchanged from those reported on 9 May 2024 and range between flat
cash (best case) and 1% reduction (worst case) with a mid-range of 0.5%
reduction. This assumption is based on the settlement over the last few years
and with the most recent year 2024-25 being a 0.5% reduction.  Although the
spending review published in May 2022 had indicated that the total budget for
Local Government would remain flat cash until 2027-28, our Council relies on
the floor mechanism to protect our funding and the floor was set at 0.5% below
the annual change in 2024-25 and is likely to continue at this level. 
1.4 There are no changes to my previous assumptions around the growth in
Council Tax. The Council tax base has been assumed to grow by 0.25% in the
worst case scenario, 0.5% in the mid-range scenario and 0.75% in the best
case. 
1.5 There has been one change to the base budget since the report on 9 May
2024 which relates to the Council’s share of the Children’s Social Care Pay
Uplift (£0.063m). 
1.6 Assumptions in respect of employee costs for Council services are as follows: 
 The SJC and Chief Officers pay awards for 2024-25 have still to be agreed
and may have a further impact on the base budget if the pay award is
higher than the 3% allowed for in the budget. Two offers have been rejected
by the Trade Unions recently, the first being an increase equating to 4.24%
which would have increased the budget gap in 2025-26 by £1.446m, and
the second proposed an increase of 3.2% which would have increased the
estimated gap by £0.233m. It is still unclear at what level the pay award will
be agreed for 2024-25 and subsequently the financial impact this will have
on future years but this will be kept under review as further information
becomes available.
 The Teachers pay award for 2024-25 has already been agreed up to 31
July 2024 as part of a previous 28 month deal however any increase
beyond that date is still in the negotiation stage.
Page 125 Agenda Item 5a

Page 126

 For future years, the mid-range scenario remains at 2% but a risk remains
that it could be higher and this will be closely monitored.  
 Increments are estimated between £0.329m and £0.605m with a mid-range
of £0.605m. 
1.7 For non-pay inflation, only unavoidable/inescapable inflation has been built in
for the best case and mid-range scenarios with a contingency of £0.250m built
into the mid-range. A further general inflationary increase has been built into
the worst case scenario. 
1.8 There are a number of cost and demand pressures for Council services built
into each scenario. Changes to these pressures since the report on 9 May
2024 are: 
 Amended – Bus Transport Contracts – a further contract renewal has been
received which has increased the cost pressure by £0.210m.
 New – Education ICT Network Infrastructure – technology upgrade,
improved security and reconfiguration to support in-school and at home
learning (£0.295m). There is a separate report on the agenda providing
Members with further detail.
 New – Roads and Amenity Services Charging Saving – the saving is no
longer fully achievable due to lower than anticipated income generation.
This will now be considered as part of the Roads and Infrastructure Review
(£0.100m).
 New – Insurance premiums – renewal notices have been received which
include inflation of 22% which is significantly higher than the inflation
previously built into the budget outlook (£0.309m). 
1.9 In addition to the identified cost and demand pressures an allowance for
unidentified cost and demand pressures has been included in mid-range of
£0.500m per year (best case scenario £0.250m per year and worst case
scenario £1m per year). 
1.10 There will be a political decision to be made as to the future allocation to the
Health and Social Care Partnership.  As part of the budget in February 2024 an
indicative flat cash allocation for 2025-26 was agreed which has now increased
by £0.180m, as detailed in paragraph 4.1.2, in relation to the HSCP’s share of
the Children’s Social Care Pay Uplift. The indicative allocation for 2026-27
increases further by £3.053m to account for the cessation of the one-off saving
in relation to the Strathclyde Pension Fund. 
1.11 The budget gap in the mid-range scenario after allowing for the current base
commitments, employee adjustments, non-pay inflation, cost and demand
pressures and not factoring in any previous savings decisions or future
potential options is an estimated gap over the five year period of £48.118m with
a gap of £13.314m in 2025-26. 
1.12 The measures to balance the budget over the next five years are as follows: 
 Proposed increase to fees and charges of between 3% and 9% (6% mid-
Page 126

Page 127

range).
 Proposed increase to Council Tax (5% increase in 2025-26 in the mid and
worst case scenarios rising to 7% in the best case scenario, with a 5%
increase in all scenarios in future years).
 Policy savings already agreed by Council in February 2024. 
 Management/Operational savings already agreed by Council February
2024. 
1.13 In the mid-range scenario, the budget gap estimated over the five year period
2025-26 to 2029-30 is £26.504m with a gap of £9.484m in 2025-26.   
1.14 The budget gap in the best case scenario over the five years is £13.659m with
a gap of £3.416m in 2025-26 and in the worst case scenario, the budget gap
over the five years is £91.085m with a gap of £21.355m in 2025-26.  A
summary of all three scenarios is included within Appendix 1.  
1.15 It is recommended that the Policy and Resources Committee consider the
current estimated budget outlook position for the period 2025-26 to 2029-30. 
Page 127

Page 128

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 15 AUGUST 2024
BUDGET OUTLOOK 2025-26 TO 2029-30  
2. INTRODUCTION 
2.1 This report provides an update to the budget outlook covering the period 2025-
26 to 2029-30, reported to the Policy and Resources Committee on 9 May 2024. 
2.2 The budget outlook has been prepared using three different scenarios, best
case, worst case and mid-range.  Relatively small variations in assumptions can
lead to fairly significant changes in the outcome.  In the paragraphs that follow,
the mid-range outlook is shown, however, all three scenarios are detailed within
Appendix 1. 
3.  RECOMMENDATIONS 
3.1  It is recommended that the Policy and Resources Committee consider the
current estimated budget outlook position for the period 2025-26 to 2029-30. 
4. DETAIL 
4.1 Funding 
Scottish Government Finance Settlement 
4.1.1  There are no changes to my previous assumptions around the level of future
Scottish Government funding. In my report in May 2024 I advised that it would
be prudent to assume a 0.5% reduction in future years within the mid-range
scenario.  Although the spending review published in May 2022 had indicated
that the total budget for Local Government would remain flat cash until 2027-28,
our Council relies on the floor mechanism to protect our funding and the floor
was set at 0.5% below the annual change in 2024-25 and it is likely to continue
at that level.  The funding assumption has been set between a 1% reduction
(worst case) and flat cash (best case) with a mid-range reduction of 0.5%. This
will be closely monitored and updated during the year as required.   
4.1.2  In respect of the Children’s Social Care pay uplift, the Scottish Government
notified us in June 2024 of Argyll and Bute Councils share of the £19.861m
funding provided which totalled £0.243m. £0.180m of this funding is a straight
pass through to the HSCP, therefore the payment made to them will be adjusted
accordingly, and £0.063m is for the Education Service. The base budget for
Education will be increased accordingly to pay for the uplift therefore this
additional funding has no overall impact on the budget gap.   
4.1.3 The table below summarises the mid-range scenario estimates based on a
0.5% settlement reduction each year. 
Page 128

Page 129

2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Estimated SG Funding 244,657 243,434 242,217 241,006 239,801
Children’s Social Care
Pay Uplift
243 243 243 243 243
Total Estimated SG
Funding
244,900 243,677 242,460 241,249 240,044 
Council Tax 
4.1.4 The Council Tax base for 2024-25 was set at £63.278m which reflected no
inflationary increase as agreed by the Council on 15 April 2024. 
4.1.5 On 15 April 2024 it was reported to Council that an adjustment to the level of
Council Tax received relating to the double charge on second homes would be
prudent given the number of representations made in relation to this. As such
anticipated Council Tax income was reduced by £0.261m within the budget
outlook which will be monitored throughout the year. This adjustment is included
within the base figure of £63.278m. 
4.1.6 There are no changes to my previous assumptions around the growth in Council
Tax. It has been assumed that there will be a 0.5% growth in the mid-range
scenario for all years from 2025-26 (0.75% in best case and 0.25% in worst
case). 
4.1.7 
4.1.8
As reported previously, as part of the 2023-24 budget setting process a
business process review was undertaken of the Revenues and Benefits Service
where one of the outcomes was anticipated increased Council Tax recoveries
equating to £0.200m in 2025-26 which have been built into the budget outlook.
This is a reduction of £0.149m from 2024-25 as recoveries are expected to be
higher in the first two years of inception dropping down to an almost steady
state from 2025-26 onwards. 
Within this report, I will present the budget gap, prior to any Member based
decisions and therefore at this stage in the report, the Council tax base is
assumed to remain at the same level as 2024-25.   
General Fund 
4.1.9 As reported in the budget pack in February 2024, reduced employer contribution
rates payable to Strathclyde Pension Fund will result in one-off savings in 2024-
25 and 2025-26. It was agreed that the saving in each of these years be
transferred to the General Fund, with some being used to fund capital
expenditure. £9.928m of savings will be transferred to reserves in 2025-26 in
relation to this, this amount relates to the saving for the Council and the HSCP. 
4.1.10 It was also agreed at the budget meeting in February 2024 that £2m of the
pension fund gain would be released each year for a period of 3 years (2024-25
through to 2026-27) in order to help bridge the budget gap.  
Page 129

Page 130

4.1.11  The table below summarises the estimated total funding in the mid-range
scenario. 
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Estimated SG Funding 244,900 243,677 242,460 241,249 240,044
Transfer to Reserves in
relation to Strathclyde
Pension Fund
(9,928) 0 0 0 0
Released Strathclyde
Pension Fund Gain
2,000 2,000 0 0 0
Council Tax Base 63,278 63,278 63,278 63,278 63,278
Council Tax Growth 315 631 949 1,268 1,589
Adjustment to additional
Council Tax recoveries
(para 4.1.7)
(149) (147) (145) (143) (143)
Total Estimated
Funding
300,416 309,439 306,542 305,652 304,768 
4.2 Base Budget 
4.2.1  The 2024-25 budget approved by Council on 22 February was £301.885m. An
amendment in respect of re-running the Council Tax annual billing amounting to
£0.080m was agreed on 15 April 2024 resulting in a revised base budget of
£301.965m.   
4.2.2 There has been one change to the base budget since the report on 9 May 2024,
as detailed at paragraph 4.1.2, relating to funding received for the Children’s
Social Care Pay Uplift. The Council’s share of this was £0.063m and the budget
within Education is required to be increased accordingly. 
4.2.3  For future years, there are adjustments required to the base budget from
decisions by Council on 22 February 2024 and other adjustments as noted in
the table below: 
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Base Budget 2024-25 301,965 301,965 301,965 301,965 301,965
Adjust for one-off 2024-
25 cost pressures
(130) (130) (130) (130) (130)
Adjust for one-off 2024-
25 Management/
Operational savings
1,694 1,694 1,694 1,694 1,694
Children’s Social Care
Pay Uplift
63 63 63 63 63
Revised Base Budget 303,592 303,592 303,592 303,592 303,592  
4.3 Employee Cost Changes 
Pay Award 
Page 130

Page 131

4.3.1  The SJC and Chief Officers pay awards for 2024-25 have still to be agreed and
may have a further impact on the base budget if the pay award is higher than
the 3% allowed for in the budget. Two offers have been rejected by the Trade
Unions recently, the first being an increase equating to 4.24% which would have
increased the budget gap in 2025-26 by £1.446m, and the second proposed an
increase of 3.2% which would have increased the estimated gap by £0.233m. It
is still unclear at what level the pay award will be agreed for 2024-25 and
subsequently the financial impact this will have on future years but this will be
kept under review as further information becomes available. 
The Teachers pay award has been agreed up to 31 July 2024 as part of a
previous 28 month deal and any increase beyond that date has still to be
negotiated. 
4.3.2 For future years, the previous assumption of a 2% increase remains unchanged. 
The best case scenario also remains at a 2% increase (on the basis that the
increase is not likely to be less than this) and the worst case scenario assumes
a 5% increase. The pay assumption is very difficult to predict but there is an
expectation as general inflation reduces that pay inflation will also reduce,
however, there remains a risk that the pay award could be higher and this will
be monitored and updated throughout the year if more information becomes
available. Every 1% over and above what is budgeted would add an additional
pressure of circa £1.7m. 
4.3.3 On 4 April 2024 a Scottish Statutory Instrument was passed regarding
increasing councillors pay with effect from 1 April 2024, the detail of which was
presented to Council on 25 April. The financial impact of this is an increase of
£0.033m which has been adjusted for within the budget outlook. Discussions
continue between the Scottish Government and the Scottish Local Authority
Remuneration Committee (SLARC) regarding Councillors remuneration which
may have a further impact on the budget outlook position and will be included
within the budget estimates at a later date if required. 
Increments 
4.3.4  There are no changes to my previous assumption around the cost of employee
increments. It has been assumed that for future years, the best case is assumed
to be half of the previous year cost, for mid-range and worst case, assumes
equal to the cost in 2024-25 (£0.605m). 
4.3.5
Strathclyde Pension Fund 
As detailed in the budget pack presented to Council in February 2024, the
employer contribution rate paid to the Strathclyde Pension Fund will fall from
19.3% to 6.5% in 2024-25 and 2025-26 and rise to a sustainable long-term rate
of 17.5% in the 2026-27. The reduction in the first 2 years equates to reduced
costs of £6.875m per annum relating to Council employees (excluding HSCP).
From 2026-27 the costs will rise again to 17.5% therefore this increase is
required to be built into projections from 2026-27 onwards. 
Page 131

Page 132

Teacher Numbers 
4.3.6 As part of the 2023-24 Local Government Finance Settlement the Scottish
Government held back £45.5m on the condition that Council’s maintained
teacher numbers at the 2022 census level. The December 2023 census showed
a reduction in teacher numbers of 160. Ultimately, Scottish Government
released the £45.5m to all local authorities, regardless of whether they
maintained teacher numbers. Scottish Government has, for 2024-25, removed
£145.5m from the General Revenue Grant and has instead issued this as a
specific grant, conditional on maintaining teacher numbers at the level set out in
each Council’s grant letter.  For Argyll and Bute Council this is £2.1m and there
is an expectation that we will maintain 848 teachers, this was the figure returned
in the 2023 census and 13 teachers more than in the base budget.  To maintain
a figure of 848 teachers would result in a cost pressure of £0.880m. 
Discussions are continuing between COSLA and the Scottish Government and
at this stage the additional cost has not been added into the budget outlook but
there remains a risk that if we do not maintain the teacher numbers in our grant
letter then some or all of the specific grant could be withheld.   
4.3.7 The table below summarises the employee cost movements in the mid-range
scenario for Council services.  The employee cost increases relating to Social
Work within the Health and Social Care Partnership are summarised within
paragraph 4.6.4. 
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Pay Award  3,448 6,651 9,918 13,250 16,649
Pay Award – Elected
Members
33 33 33 33 33
Increments 605 1,210 1,815 2,420 3,025
Increase in costs after
one-off reduction in
Strathclyde Pension Fund
rate ceases
0 6,875 6,875 6,875 6,875
Total Employee Cost
Changes
4,086 14,769 18,641 22,578 26,582 
4.4 Non-Pay Inflation 
4.4.1 The Council only include non-pay inflation within the budget where it is deemed
to be unavoidable or inescapable.  In terms of the budget outlook,
unavoidable/inescapable non-pay inflation is built into the best case and mid-
range scenarios with a general inflation allowance over and above this built into
the worst case.   
4.4.2 Officers continue to review areas of non-pay inflation on an ongoing basis. The
principle of only budgeting for unavoidable/inescapable remains, however, it has
to be noted that in this current financial climate, some budgets with no inflation
allowed for are now stretched beyond the point of containing the cost within
budget and therefore the budget will now buy less than what it used to be able
Page 132

Page 133

to buy (so in effect, we will see some cuts as a result). 
4.4.3 When creating a budget outlook for future years, there is a risk that inflation
assumptions could change during the year.  Due to the current inflation
uncertainty, it would be prudent to include a contingency for other inflation
increases not included in the calculations.  A contingency allowance of £0.500m
is included within the worst case scenario and a £0.250m allowance included
within the mid-range scenario each year.  No contingency is included within the
best case scenario.  This contingency will either be required, reduced or
removed to reflect changing circumstances before the 2025-26 budget is set.   
4.4.4  The table below summarises the non-pay inflation in the mid-range scenario for
Council services with more detail available in Appendix 2.  The non-pay inflation
increases relating to Social Work within the Health and Social Care Partnership
are summarised within paragraph 4.6.4. 
Inflation Category 2025-26
Previous
estimates
(May 2024)
£000
2025-26
Updated
estimates
£000
Increase/
(Decrease)
£000
Utilities - Electricity, Gas, Oil, Water 192 179 (13)
Street Lighting Electricity 25 23 (2)
Vehicle Fuel 35 32 (3)
Vehicle Charging Point Electricity 0 5 5
Central Repairs-Outside Contractors 83 76 (7)
Waste PPP/Landfill Tax 206 206 0
NPDO/HUB Schools 424 391 (33)
Community Pool Subsidies 34 31 (3)
Residential Schools 36 33 (3)
Pre-Primary Partner Providers 227 227 0
ICT 203 210 7
Catering Purchases and Milk 123 64 (59)
Insurance 93 459 366
Bitumen – Roads 16 15 (1)
Contribution to Joint Boards 43 38 (5)
Annual External Audit Fee 10 9 (1)
Public Transport 220 220 0
School Transport 153 153 0
SEPA – Waste Disposal 0 7 7
Contingency for unidentified/
insufficient inflation estimate
250 250 0
Total 2,373 2,628 255 
4.4.5  The most significant movement in non-pay inflation since last reported in May
2024 relates to insurance premiums which have seen a 22% inflationary
increase in renewal prices. Previously an increase of 5% had been included
within estimations however given that the renewal notices have increased by
substantially more than this it would seem to prudent to include an increase of
Page 133

Page 134

20% for future years. 
4.4.6 The cumulative inflation for years 2026-27 to 2029-30 is noted in the table below
and is based on future years estimates of inflation at this point it time, however,
due to the volatility of inflation recently it is very difficult to predict and the
estimates will be kept under close review.   
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Unavoidable/Inescapable 4,989 7,487 10,136 12,951
Total Non-Pay Inflation 4,989 7,487 10,136 12,951 
4.5 Cost and Demand Pressures 
4.5.1  For a number of years, services have worked on the basis of having to contain
any cost and demand pressures within current resources where possible,
however, there are a number of cost and demand pressures already identified
for Council services which were reported as part of the budget in February
2024.  Since the Policy and Resources Committee on 9 May 2024 the following
changes have been made to the cost and demand pressures: 
 Amended – Bus Transport Contracts – a further contract renewal has been
received which has increased the cost pressure by £0.210m. 
 New – Education ICT Network Infrastructure – technology upgrade,
improved security and reconfiguration to support in-school and at home
learning (£0.295m). There is a separate report on the agenda providing
Members with further detail.
 New – Roads and Amenity Services Charging Saving – the saving is no
longer fully achievable due to lower than anticipated income generation. This
will now be considered as part of the Roads and Infrastructure Review
(£0.100m).
 New – Insurance premiums – renewal notices have been received which
include inflation of 22% which is significantly higher than the inflation built
into the budget outlook (£0.309m). 
4.5.2  As with inflation, when creating a budget outlook beyond one year, there is a
risk that unknown cost and demand pressures will emerge that have not been
included within the outlook.  It is suggested that a £0.250m general allowance
for this is included within the best case scenario, £0.500m within the mid-range
scenario and a £1m allowance included within the worst case scenario each
year. 
4.5.3 The cost pressures are detailed in appendix 3 and summarised in the table
below and will be subject to review during the financial year.   
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Universal Credit – HB
Admin Grant
40 80 120 160 200
ASN Support 202 410 624 624 624
SEEMiS Membership Fees 0 7 7 7 7
Page 134

Page 135

Maintenance/Repair of
School Estate
360 360 360 360 360
Election costs 0 0 350 0 0
Education ICT Network
Infrastructure 
295 295 348 348 348
Compliance with BMW Ban 462 925 925 925 925
Local Development Plan 0 50 0 0 0
Increase to borrowing costs
as a result of investment
agreed at February 2024.  
282 282 282 282 282
Civica Revenue and
Benefits System
0 0 63 63 63
Bus Transport Contracts 710 710 710 710 710
Roads & Amenity Services
Income - Saving no longer
achievable 
100 100 100 100 100
Insurance premium
increases
309 309 309 309 309
Allowance for pressures in
future years
500 1,000 1,500 2,000 2,500
Total Cost and Demand
Pressures 
3,260 4,528 5,698 5,888 6,428 
4.5.4 The cost and demand pressures relating to Social Work within the Health and
Social Care Partnership are summarised within paragraph 4.6.4. 
4.6 Health and Social Care Partnership 
4.6.1  The Council, at the budget meeting on 24 February 2024, agreed a base
allocation to the HSCP of £78.611m for 2024-25 as well as an indicative flat
cash allocation for 2025-26. The indicative allocation for 2026-27 onwards
increases by £3.053m to account for the cessation of the one-off employer
contribution rate saving relating to the Strathclyde Pension Fund.    
4.6.2  As detailed in paragraph 4.1.2, funding has been received in respect of the
Children’s Social Care pay uplift of which £0.180m is a straight pass through to
the HSCP therefore the payment made to them will increase by this amount
each year. 
4.6.3 In the budget outlook, I have assumed flat cash allocations across all scenarios,
with the exception of the Strathclyde Pension Fund adjustment. These are only
assumptions and it will be a matter for Council to consider as part of the budget
process next year.   
4.6.4 Social Work services have already identified a number of cost and demand
pressures and these are summarised below and included within Appendix 4 for
information purposes.  It is expected that the HSCP absorb their cost and
demand pressures from their funding allocation.  Note that these only extend to
three years rather than the five years within this Council budget outlook.   
2025-26
£000
2026-27
£000
2027-28
£000
Page 135

Page 136

Pay Inflation 1,049 2,301 3,590
Pay Increments 172 344 516
Non-Pay Inflation 969 2,017 3,126
Care Services for Older People 211 426 644
Care Services for Younger Adults 59 119 180
Adult Services - Supported Living 115 230 345
Adult Services – Mental Health 61 123 187
Continuing Care for Looked After
Children
323 896 1,469
Unknown Cost and Demand Pressures 500 1,000 1,500
Total Cost Increase estimates for
Social Work
3,459 7,456 11,557 
4.7 Live Argyll 
4.7.1 In the budget outlook, I have assumed allocations to Live Argyll on the same
basis as the Scottish Government funding assumptions which range from a 1%
reduction (best case) and flat cash (worst case) with a mid-range reduction of
0.5%. This is only an assumption and it will be a matter for Council to consider
as part of the budget process next year. 
The indicative allocation for 2026-27 onwards also increases by £0.118m to
account for the cessation of the one-off employer contribution rate saving
relating to the Strathclyde Pension Fund. 
4.8 Estimated Budget Gap PRIOR to Measures to Balance the Budget 
4.8.1 The budget gap in the mid-range scenario after allowing for the current base
commitments, employee adjustment, non-pay inflation and cost and demand
pressures is summarised in the table below.  This is the budget gap prior to
factoring in any previous savings decisions or potential options towards
balancing the budget.     
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Base Budget 303,592 303,592 303,592 303,592 303,592
Employee Cost
Changes
4,086 14,769 18,641 22,578 26,582
Non-Pay Inflation 2,628 4,989 7,487 10,136 12951
Cost and Demand
Pressures 
3,260 4,528 5,698 5,888 6,428
Adjustment to HSCP
Payment re SPF gain
180 3,233 3,233 3,233 3,233
Adjustment to Live
Argyll Payment 
(16) 102 101 101 100
Total Estimated
Expenditure
313,730 331,213 338,752 345,528 352,886
Estimated Funding 300,416 309,439 306,542 305,652 304,768
Estimated Budget
Surplus / (Gap)
Cumulative
(13,314) (21,774) (32,210) (39,876) (48,118) 
Page 136

Page 137

4.9  Measures to Balance the Budget 
4.9.1 In 2024-25 a general inflationary increase of 6% was applied to fees and
charges.  For the budget outlook a range of between 3% (worst case) and 9%
(best case) with a mid-range of 6% has been included. There is no general
inflationary increase of 6% applied to Piers and Harbours to ensure that any
income generated is not in excess of expenditure.  
4.9.2 Some of the policy options were agreed at the Council meeting on 22 February
2024 that impacted on 2025-26 and beyond.   These are now factored into the
budget outlook, reducing the budget gap. 
4.9.3  In terms of Council Tax, a 5% increase had been assumed in the mid and worst
case scenarios and a 7% increase in the best case scenario for 2025-26 on the
basis that the majority of Councils increased their Council Tax by at least 5% in
2023-24 prior to the freeze in 2024-25. From 2026-27 a 5% increase has been
assumed in all scenarios. In light of the significant budget gap, this is an area
that Members will require to give due consideration to as part of the budget
setting for 2025-26 and beyond.    
4.9.4  The table below summarises the proposed measures to balance the budget in
the mid-range scenario. 
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Fees and Charges
Increase
385 771 1,156 1,541 1,927
Council Tax Increase  3,162 6,514 10,049 13,778 17,709
Previously agreed Policy
Savings 
248 724 1,360 1,829 1,943
Previously agreed
Management/Operational
Savings 
35 35 35 35 35
Total Measures to
Balance the Budget
3,830 8,044 12,600 17,183 21,614 
4.10 Estimated Budget Gap AFTER Measures to Balance the Budget 
4.10.1 The table below summarises the estimated budget gap in the mid-range
scenario. 
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Estimated Budget Gap Prior
to Measures to Balance
Budget
(13,314) (21,774) (32,210) (39,876) (48,118)
Savings Measures 3,830 8,044 12,600 17,183 21,614
Estimated Budget Surplus
/ (Gap) Cumulative
(9,484) (13,730) (19,610) (22,693) (26,504)
Estimated Budget Surplus
/ (Gap) In Year
(9,484) (4,246) (5,880) (3,082) (3,811) 
Page 137

Page 138

4.10.2 In the mid-range scenario, the budget gap estimated over the five year period
2025-26 to 2029-30 is £26.504m with a gap of £9.484m in 2025-26.   
4.10.3 The budget gap in the best case scenario over the five years is £13.659m with a
gap of £3.416m in 2025-26 and in the worst case scenario, the budget gap over
the five years is £91.085m with a gap of £21.355m in 2024-25.  A summary of
all three scenarios is included within Appendix 1. 
4.10.4 The changes from the previous anticipated outlook reported to the Council on 9
May 2024 are summarised in the table below: 
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2028-29
£000
Previously reported
budget surplus / (gap)
Cumulative 
(8,315) (12,294) (17,800) (20,497) (23,849)
Non Pay Inflation
Adjustment
(255) (522) (843) (1229) (1688)
Adjustment to Cost
Pressure relating to bus
contracts
(210) (210) (210) (210) (210)
New Cost Pressure –
Education ICT Network 
(295) (295) (348) (348) (348)
New Cost Pressure –
Roads & Amenity
Services - Saving no
longer achievable
(100) (100) (100) (100) (100)
New Cost Pressure –
Increased Insurance
Premiums
(309) (309) (309) (309) (309)
Revised Budget
Surplus / (Gap)
Cumulative
(9,484) (13,730) (19,610) (22,693) (26,504) 
5. CONCLUSION 
5.1 In the mid-range scenario, the budget gap estimated over the five year period
2025-26 to 2029-30 is £26.504m with a gap of £9.484m in 2025-26.   Council
officers are continuing to explore savings options during 2024-25 and these will
be presented to Members at a future date.  
5.2  This is a very challenging budget outlook position and the level of Scottish
Government grant and the pay award are two assumptions that could alter the
figures significantly.  These will be kept under close review and the budget
outlook updated as and when further information becomes available.   
6. IMPLICATIONS 
6.1 Policy -  Sets out the budget outlook that provides the financial
envelope for policy decisions.
Page 138

Page 139

6.2 Financial -  Sets best, worst and mid-range scenarios in respect of
the budget outlook.  The medium to longer term
financial strategy is being updated and the Council are
actively continuing to pursue opportunities to mitigate
against future budget gaps. 
6.3 Legal -  None directly from this report but Council will need to
balance the budget. 
6.4 HR -  None directly from this report but there is a strong link
between HR and budgets.
6.5 Fairer Scotland Duty - See below
6.5.1 Equalities None directly from this report but any proposals to
address the estimated budget gap will need to consider
equality issues.
6.5.2 Socio Economic Duty None directly from this report but any proposals to
address the estimated budget gap will need to consider
socio economic issues.
6.5.3 Islands Duty None directly from this report but any proposals to
address the estimated budget gap will need to consider
any island specific issues. 
6.6 Climate Change The Council is committed to addressing climate change
and reviews how Services are delivering this on an
ongoing basis within the available budget resources.
6.7 Risk -  None directly from this report but any proposals to
address the estimated budget gap will need to consider
risk.
6.8 
6.9
Customer Service – 
The Rights of the
Child (UNCRC) -
None directly from this report but any proposals to
address the estimated budget gap will need to consider
customer service. 
None 
Kirsty Flanagan
Executive Director/Section 95 Officer
23 July 2024 
Policy Lead for Finance and Commercial Services:  Councillor Ross Moreland 
APPENDICES: 
Appendix 1 – Budget Outlook, Best, Worst and Mid-Range Scenarios
Appendix 2 – Non Pay Inflation
Appendix 3 – Cost and Demand Pressures (Council Services)
Appendix 4 – Cost and Demand Pressures (Social Work) 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 139

Page 140

BUDGET OUTLOOK 2025-26 to 2029-30 APPENDIX 1
POLICY AND RESOURCES COMMITTEE - 15 AUGUST 2024
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Base Budget 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965
Base Budget Adjustments 1,517 1,517 1,517 1,517 1,517 1,627 1,627 1,627 1,627 1,627 1,619 1,619 1,619 1,619 1,619
Revised Base Budget 303,482 303,482 303,482 303,482 303,482 303,592 303,592 303,592 303,592 303,592 303,584 303,584 303,584 303,584 303,584
Pay Award 3,448 6,651 9,918 13,250 16,649 3,448 6,651 9,918 13,250 16,649 11,414 22,873 34,905 47,539 60,805
Pay Award - Elected Members 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33
Pay Increments 329 658 986 1,315 1,643 605 1,210 1,815 2,420 3,025 605 1,210 1,815 2,420 3,025
Adjustment to Employee Base 0 6,875 6,875 6,875 6,875 0 6,875 6,875 6,875 6,875 0 6,875 6,875 6,875 6,875
Total Employee Cost Changes (Council Services) 3,810 14,217 17,812 21,473 25,200 4,086 14,769 18,641 22,578 26,582 12,052 30,991 43,628 56,867 70,738
Non-Pay Inflation - Council Services 2,068 4,097 6,240 8,511 10,919 2,628 4,989 7,487 10,136 12,951 4,789 9,085 13,544 18,182 23,017
Housing Benefits Admin Grant 40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
ASN Support 202 410 624 624 624 202 410 624 624 624 202 410 624 624 624
SEEMIS Membership Fees 0 7 7 7 7 0 7 7 7 7 0 7 7 7 7
Maintenance/Repair of School Estate 360 360 360 360 360 360 360 360 360 360 360 360 360 360 360
Election Costs 0 0 327 0 0 0 0 350 0 0 0 0 370 0 0
Education ICT Network Infrastructure 295 295 348 348 348 295 295 348 348 348 295 295 348 348 348
Compliance with BMW Ban 462 925 925 925 925 462 925 925 925 925 2,116 925 925 925 925
Planning (Local Development Plan) 0 50 0 0 0 0 50 0 0 0 0 50 0 0 0
Borrowing to pay for weather incident costs 282 282 282 282 282 282 282 282 282 282 282 282 282 282 282
Civica Revenue and Benefits System 0 0 37 37 37 0 0 63 63 63 0 0 137 137 137
Bus Transport Contracts 710 710 710 710 710 710 710 710 710 710 710 710 710 710 710
Roads and Amenity Services saving no longer achievable in full 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
Increase in insurance premiums 309 309 309 309 309 309 309 309 309 309 309 309 309 309 309
Allowance for Cost and Demand Pressures Future Years 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500 1,000 2,000 3,000 4,000 5,000
Total Cost and Demand Pressures 3,010 4,028 4,899 4,862 5,152 3,260 4,528 5,698 5,888 6,428 5,414 5,528 7,292 7,962 9,002
Adjustment to Health and Social Care Partnership Payment 180 3,233 3,233 3,233 3,233 180 3,233 3,233 3,233 3,233 180 3,233 3,233 3,233 3,233
Adjustment to Live Argyll Management Fee (33) 86 85 84 83 (16) 102 101 101 100 0 118 118 118 118
Total Estimated Expenditure PRIOR to measures to balance the budget 312,517 329,142 335,751 341,644 348,069 313,730 331,213 338,752 345,528 352,886 326,019 352,539 371,399 389,946 409,692
Scottish Government Grant 248,129 248,129 246,129 246,129 246,129 244,900 243,677 242,460 241,249 240,044 245,670 243,236 238,826 236,440 234,078
Transfers to/from Reserves - Strathclyde Pension Fund (7,928) 2,000 0 0 0 (7,928) 2,000 0 0 0 (7,928) 2,000 0 0 0
Council Tax 63,601 64,079 64,560 65,045 65,531 63,444 63,762 64,082 64,403 64,724 63,292 63,454 63,617 63,781 63,940
Total Funding 303,802 314,208 310,689 311,174 311,660 300,416 309,439 306,542 305,652 304,768 301,034 308,690 302,443 300,221 298,018
Budget Surplus / (Gap) PRIOR to measures to balance the budget (8,715) (14,934) (25,062) (30,470) (36,409) (13,314) (21,774) (32,210) (39,876) (48,118) (24,985) (43,849) (68,956) (89,725) (111,674)
Measures to Balance the Budget:
Fees and Charges 578 578 578 1,156 1,156 385 771 1,156 1,541 1,927 193 385 578 771 963
Council Tax Increase above SG Funding 4,438 7,854 11,465 15,280 19,310 3,162 6,498 10,017 13,728 17,640 3,154 6,474 9,968 13,644 17,512
Council Tax Increase (Growth element) 0 89 157 229 306 0 16 32 50 69 0 32 65 100 136
Management/Operational Savings agreed Feb 2023 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35
Policy Savings Agreed Feb 2023 248 724 1,360 1,829 1,943 248 724 1,360 1,829 1,943 248 724 1,360 1,829 1,943
Total Measures to Balance the Budget 5,299 9,280 13,595 18,529 22,750 3,830 8,044 12,600 17,183 21,614 3,630 7,650 12,006 16,379 20,589
Budget Surplus / (Gap) Cumulative AFTER measures to balance the budget (3,416) (5,654) (11,467) (11,942) (13,659) (9,484) (13,730) (19,610) (22,693) (26,504) (21,355) (36,199) (56,950) (73,346) (91,085)
Budget Surplus / (Gap) In Year AFTER measures to balance the budget (3,416) (2,238) (5,813) (475) (1,718) (9,484) (4,246) (5,880) (3,082) (3,811) (21,355) (14,843) (20,751) (16,396) (17,738)
Mid-Range Scenario Worst Case ScenarioBest Case Scenario
Page 140

Page 141

NON-PAY INFLATION (COUNCIL) Appendix 2
Service Category Basis of Inflation Inflation
Percentage
Mid Range
2025/26
Council Wide Electricity Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 121,998
Council Wide Gas Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 22,187
Council Wide Heating Oils Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 10,866
Council Wide Solid Fuel Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 7,816
Council Wide Water Charges Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 15,288
Council Wide Vehicle Fuel Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 32,463
Council Wide Central Repairs - Outside Contractors Based on estimate for RPI at 2025 Q1 tracking the Bank of England forecast for CPI at May 2024, with 0.5% tolerance for best and
worst case.
3.60% 76,392
Council Wide Insurances Mid-point set at 20% for 2025/26 per uplifts in 2024/25. Reduced to 15% in subsequent years, with 0.5% tolerance for best and
worst case.
20.00% 459,473
Council Wide Contribution to Joint Boards Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 37,903
Council Wide Contingency for unidentified/insufficient inflation estimate £250k built in to mid-range and £500k built in to worst case scenario 250,000
1,034,386
Education Pre-Primary Partner Provider Uplift Estimate for the increase in the Real Living Wage, with a tolerance of 0.5% for best and worst case.To be updated when new RLW
figure is announced in November 2024.
5.00% 226,603
Education External School Placements Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 33,139
Commercial Services Catering Purchases Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 64,389
Legal & Regulatory Support Leisure SLA-MAKI/Islay Pools Based on estimate for RPI at 2025 Q1 tracking the Bank of England forecast for CPI at May 2024, with 0.5% tolerance for best and
worst case.
3.60% 7,206
Legal & Regulatory Support Leisure SLA-Atlantis Based on estimate for RPI at 2025 Q1 tracking the Bank of England forecast for CPI at May 2024, with 0.5% tolerance for best and
worst case.
3.60% 24,454
Legal & Regulatory Support NPDO-Variable Element Based on estimate for RPI at 2025 Q1 tracking the Bank of England forecast for CPI at May 2024, with 0.5% tolerance for best and
worst case.
3.60% 314,202
Legal & Regulatory Support NPDO-Utilities Rebate Based on estimate for RPI at 2025 Q1 tracking the Bank of England forecast for CPI at May 2024, with 0.5% tolerance for best and
worst case.
3.60% (11,886)
Legal & Regulatory Support NPDO-Electricity Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 17,630
Legal & Regulatory Support NPDO-Gas Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 7,145
Legal & Regulatory Support NPDO-Heating Oil Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 2,801
Legal & Regulatory Support NPDO-LPG Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 2,438
Legal & Regulatory Support NPDO-Water Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 10,478
Legal & Regulatory Support HUB-Variable Element Based on estimate for RPI at 2025 Q1 tracking the Bank of England forecast for CPI at May 2024, with 0.5% tolerance for best and
worst case.
3.60% 49,176
747,775
Customer and Support Services ICT Estimate added at 10% to reflect input from ICT on increasing costs. 10.00% 210,112
Financial Services Annual External Audit Fee Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 9,177
Roads and Infrastructure Public Transport Reflects a 3% uplift for annual inflation set within the terms of the contracts between the Council and the service providers. 3.00% 219,821
Roads and Infrastructure School Transport Reflects a 3% uplift for annual inflation set within the terms of the contracts between the Council and the service providers. 3.00% 152,562
Roads and Infrastructure Waste PPP-Private Contractor Inflation Based on 85% of an estimate for RPIX Rate at 2025 Q1 tracking the Bank of England CPI forecast for CPI at February 2024, with a
0.5% tolerance for best and worst case.
2.00% 149,861
Roads and Infrastructure Waste PPP-Central Government Inflation Based on Landfill Tax increase between 23/24 and proposed 24/25 rate with a 0.5% tolerance for best and worst case. 1.57% 55,237
Roads and Infrastructure Scottish Environmental Protection Agency Reflects the annual inflation trend in the 2023/24 and 2024/25 financial years with a 0.5% tolerance for best and worst case. 8.00% 7,043
Roads and Infrastructure Roads - Bitumen for Road Surfacing Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 15,059
Roads and Infrastructure Electricity - Street Lighting Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 22,801
Roads and Infrastructure Electricity - Vehicle Charging Points Based on the May 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best and
worst case.
2.60% 4,604
846,277
2,628,438
Council Wide Total
Executive Director Douglas Hendry - Total
Executive Director Kirsty Flanagan - Total
Total Non-Pay Inflation in the Mid Range
Page 141

Page 142

COUNCIL COST AND DEMAND PRESSURES 2025-26 to 2029-30
Department Service Cost/Demand Pressure 2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Executive Director -
Kirsty Flanagan
Financial Services Universal Credit “Full” Service went live in Sept 2018, managed migration for working age claimants began
in August 2023 and will be completed by December 2025. Details of the migration of Pension age Housing
Benefit claimants have not yet been released initial indications was that the overall migration to Pension
Credit will be completed in 2028/2029 although that looks unlikely now. The DWP will reduce the Housing
Benefit Administration Subsidy they pay to the Council as some claimants come off of Housing Benefit
processed by Council staff and go onto Universal Credit processed by the DWP.  The Council’s caseload has
reduced since implementation of Universal Credit but it is hard to predict just how quickly the rest of the
caseload will migrate from Housing Benefit to Universal Credit between now and 2028/2029.  These figures
represent our best estimates at this time.
40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
Executive Director -
Douglas Hendry
Education The demand for ASN support in Argyll and Bute has continued to grow with a significant increase in, and
early identification of children and young people presenting with complex additional support needs,
including mental health difficulties which manifests often in dysregulated behaviours.  It is anticipated that
growth continues over the next 5 years however the extent of this growth is difficult to determine.  Scottish
Government statistics show that the number of pupils identified with ASN has increased markedly since
2010 and there continue to be year on year increases. These increases are likely due to continue as we see
the impact of the Covid 19 pandemic on children and young people who were born from 2020 onwards
and as we work with partners to streamline assessment processes which help us to understand need more
thoroughly.  Scottish Government statistical datasets show that the percentage of school roll in mainstream
schools of pupils with ASN has increased by approximately 3% year on year.  Within many authorities, this
means increased numbers of children accessing specialist provision. As Argyll and Bute do not have
equitable access to Specialist provision in all areas, the cost pressure associated with offering appropriate
support within our local schools continues to increase in line with need.
202 410 624 624 624 202 410 624 624 624 202 410 624 624 624
Executive Director -
Douglas Hendry
Education The SEEMiS group, provider of the Council's Education Management Information System, recently
reviewed their long term financial plan and it is anticipated there may be a small pressure from 2026-27
onwards.
0 7 7 7 7 0 7 7 7 7 0 7 7 7 7
Executive Director -
Douglas Hendry
Education There is an ongoing need for the Council to manage the maintenance/repair of Schools estate through the
education central repairs budget.  The demand on this budget has continued to increase due to the
amount of statutory maintenance work and emergency repairs which no longer allows for any planned
maintenance to be carried out.  The cost of planned maintenance has fallen on the service which cannot be
sustained.  Failure to carry out planned maintenance will impact significantly on the cost of emergency
repairs in the future.  The Council has over 75 school buildings to maintain and more reactive maintenance
work is required from Education Central Repairs due to reduced capital funding.
360 360 360 360 360 360 360 360 360 360 360 360 360 360 360
Executive Director -
Douglas Hendry
Legal and Regulatory
Services
Estimated cost (to be borne by the Council)  of carrying out local Government elections in May 2027 (and in
financial year 2027/28). Operating approx. 100 polling stations and carrying out poll and count for 11 Multi
member wards – requiring 11 separate counts
0 0 327 0 0 0 0 350 0 0 0 0 370 0 0
Executive Director -
Douglas Hendry and
Kirsty Flanagan
Education and ICT The Education ICT Network infrastructure in its current design is no longer suitable to
support the future delivery of the education digital learning vision and strategy. It
requires a transformative technology upgrade, improved security, and reconfiguration
to support in-school and at home learning. There are increased security threats and risks to the corporate
and education networks by retaining the education network in its present state.  ICT does not have the
resource or capacity to undertake a strategic transformation of this scale and complexity without
significant investment in hardware and software solutions, and additional engineering resources. It is
anticipated a programme of works could take up to two years to fully deliver, and due to the rising security
threats, commencement by Summer 2024 is recommended.  Capital Costs and revenue costs for 2024-25
have been identified through repurpose of earmarkings. The cost pressure for Education from 2025-26 is
£180k for specialist software licensing and an annual revenue requirement for additional engineering
resource of £115k as a future cost pressure for ICT.
295 295 348 348 348 295 295 348 348 348 295 295 348 348 348
Best Case Mid Range Scenario Worst Case
APPENDIX 3
Page 142

Page 143

COUNCIL COST AND DEMAND PRESSURES 2025-26 to 2029-30
Department Service Cost/Demand Pressure 2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Best Case Mid Range Scenario Worst Case
APPENDIX 3
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
Achieving compliance with ban on biodegradable municipal waste (BMW) in 2025.  This is the estimated
revenue costs from potential scenarios, remaining in or coming out of the current waste PPP contract. 
Coming out of the Waste PPP contract would create an additional one-off cost (reflected in the worst case
senario in financial year 2025-26). Due to the complexity of the model, estimates are subject to change and
Caledonian Economic Consultants are currently updated the figures in the original options appraisal. The
best case scenario reflects option 4 detailed in the report to the Environment, Development and
Infrastructure Committee on 01/12/2022. The worst case scenario reflects option 3 included in the same
report and takes into account the risk that the SG will not agree a derogation.  The mid-range scenario
assumes that the positive discussions with the Scottish Government will result in the Scottish Government
contributing towards the pressure facing the Council.
462 925 925 925 925 462 925 925 925 925 2,116 925 925 925 925
Executive Director -
Kirsty Flanagan
Development &
Economic Growth
Local development plan will require to be done under the new Planning legislation which is a revised
process from the current one and will have a 10 year life. The new process has 2 stages where there is likely
to be a cost pressure - a gate check followed by an examination some time later.
0 50 0 0 0 0 50 0 0 0 0 50 0 0 0
Executive Director -
Kirsty Flanagan
Financial
Services/Roads and
Infrastructure Services
At the budget setting meeting in February 2024 it was agreed to borrow to pay for the £4.348m of costs
relating to the weather incident that were not claimable through the Bellwin scheme. Whilst the Council
secured additional funding in relation to the weather related costs, this allowed the Council to freeze the
Council Tax, therefore the borrowing is still required, some in relation to the weather cost and some in
relation to other capital investments. 
282 282 282 282 282 282 282 282 282 282 282 282 282 282 282
Executive Director -
Kirsty Flanagan
Financial Services The Council’s contract with Civica for the Revenue and Benefits Management System ends in August 2024,
this is the system that allows us to bill and collect Council Tax and administer Housing Benefit on behalf of
the UK government under statute. In addition the contract for the corporate Electronic Document
Management system currently used by Revenue and Benefits services, Social Care, Human Resources and
Creditors will end in September 2024. The Council has been engaged in discussions with the supplier of
both systems, Civica for around a year to negotiate a reasonable way forward before Civica press ahead
with plans to migrate their systems to the Cloud and remove its support and development of its existing on
premise solutions. The outcome of these discussions is an extension to the contracts for current on
premise solutions for three further years to August/September 2027 with full support, however with
increases in annual recurring support and maintenance charges and licensing costs. Beyond that three year
period we expect significant increases in charges as the supplier moves the systems to the Cloud. The cost
pressure for 2027-28 onwards will be added when more information becomes available.
0 0 37 37 37 0 0 63 63 63 0 0 137 137 137
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
Bus Transport contracts have seen a siginificant increase in new contract prices due to increased costs for
fuel, insurance, maintenance, regualtory compliance and driver wages.  New contracts have seen a
combined annual increase of £710k across Argyll and Bute  Work ongoing on whether savings could be
made by reducing services or providing services in a different manner.
710 710 710 710 710 710 710 710 710 710 710 710 710 710 710
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
Previously agreed saving from 2018-19 for Roads and Amenity Services Charging (TB13b) is now not fully
achievable with a shortfall of £100k.  Limited resources within Roads and Infrastructure Services has
hampered the ability to procure external work and therefore the income generation expected as part of
this saving.  Further possible methods to secure external income will be looked at as part of the RIS Review.
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
Council Wide Council Wide Rightsize Council Insurance Budget - Insurance premiums have risen higher than previous inflationary
forecasts due to changes in law,  Increase in building values, higher contractor costs for building works,
repairs and higher component parts for cars - Inflation 22%
309 309 309 309 309 309 309 309 309 309 309 309 309 309 309
Council Wide Council Wide General provision for unidentified Cost and Demand Pressures 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500 1,000 2,000 3,000 4,000 5,000
TOTAL 3,010 4,028 4,899 4,862 5,152 3,260 4,528 5,698 5,888 6,428 5,414 5,528 7,292 7,962 9,002
Page 143

Page 144

SOCIAL WORK COST AND DEMAND PRESSURES - 2025-26 to 2027-28 APPENDIX 4
Service Cost/Demand Pressure 2025-
26
£000
2026-27
£000
2027-28
£000
2025-26
£000
2026-27
£000
2027-28
£000
2025-26
£000
2026-27
£000
2027-28
£000
All Social Work Estimated Pay inflation reflecting a best case 2%, a mid-range of 3% for
2024/25 then 2% for 2025/26 and 2026/27 and a worst case of 5%.
Adjusted for the impact of the reduction in the employer's pension
contribution rate to 6.5% in 2024/25 and 2025/26 and to 17.5% in
2026/27.
699 1,526 2,369 1,049 2,301 3,590 1,748 3,583 5,802
All Social Work Estimated Pay increments, best case is that 50% of the incremental
changes based on 2023/24 are absorbed and in the mid-range and worst
case, the increase is in line with the increase in 2023/24.
86 172 258 172 344 516 172 344 516
All Social Work Non-pay inflation, best and worst case based on unavoidable/inescapable
inflation and worst case.
777 1,606 2,476 891 1,847 2,861 1,003 2,090 3,255
All Social Work Non-pay inflation impact of payroll inflation on NHS posts which are
recharged to Social Work.
63 139 217 78 170 265 93 201 312
Adult Care Older People Demand Growth: The number of older people is increasing
and older people are living longer with significant health and support
needs and significant expectations of the support they are entitled to
receive. Demand pressure estimates 3% growth in homecare and care
home placements, this increase is supported by the growth in clients and
care requirements over a number of years although in some areas the
service capacity is being fully utilised and service expansion is proving
difficult. The best case assumes a 0% increase in spending reflecting the
limited service capacity in the area, the mid-range reflects 1.5% growth
and the worst case reflects 3% growth.
0 0 0 211 426 644 423 859 1,310
Adult Care Younger Adults Demand Growth - Physical Disability: There has been
continuing increase in demand for care and support services for
profoundly disabled younger adults (ie under 65) whose parents have
historically provided care but are no longer able to.  The best case
assumes a 1% increase in spending reflecting the limited service capacity
in the area, the mid-range reflects 2% growth and the worst case reflects
3% growth.
29 59 89 59 119 180 88 179 273
Adult Care Mental Health Demand Growth - There has been a continuing increase in
demand for residential placements and supported living for mental health
services. The best case assumes a 1% increase in spending reflecting the
limited service capacity in the area, the mid-range reflects 2% growth and
the worst case reflects 3% growth.
31 62 93 61 123 187 92 187 285
Children and
Families
Looked After Children Demand Growth - there is a continuing demand for
placements of children who are cared for by the HSCP. The best case
scenario is that the expected additional demand can be funded from
within existing resources as a result of planned improvements to the
service delivery model (eg shift away from high cost external residential
care to local foster and kinship care), the mid case reflects that additional
demand in 24/25 be funded from existing resource with £250k per annum
thereafter and the worst case reflects £250k per annum.
0 0 0 0 250 500 0 250 500
Children and
Families
Looked After Children Budget Adjustment - to reflect significant increase
in demand for placements in external residential care facilities.
323 646 969 323 646 969 323 646 969
Adult Care Mental Health Budget Adjustment - The Mental Health Supported Living
and Residential budgets are carrying a recurring unbudgeted
commitment. To address this situation, it is proposed to continue to
realign the budget over 2025-26, 2026-27 and 2027-28 whilst also
reviewing cases and redesigning services. The adjustment will be
reviewed annually to reflect spending reductions delivered as well as any
changes to funding and practice resulting from the implementation of the
Independent Review of Adult Social Care.
115 230 345 115 230 345 115 230 345
All Social Work Allowance for unknown cost and demand pressures which could arise. The
best case assumes unknown pressures totalling £250k per annum, the mid
range £500k per annum and the worst case £750k per annum.
250 500 750 500 1,000 1,500 750 1,500 2,250
TOTAL UNFUNDED COST AND DEMAND PRESSURES 2,373 4,940 7,566 3,459 7,456 11,557 4,807 10,069 15,817
Worst CaseMid RangeBest Case
Page 144

Page 145

ARGYLL AND BUTE COUNCIL           POLICY AND RESOURCES COMMITTEE 
EDUCATION / CUSTOMER & SUPPORT SERVICES                           15 AUGUST 2024 
EDUCATION NETWORK TRANSFORMATION PROGRAMME 
1. EXECUTIVE SUMMARY
1.1. Delivering the strategic vision for digital learning in Argyll and Bute and achieving the
key priorities of the National Improvement Framework  presents a number of major
challenges for the council that will require an ambitious programme of investment in
sustainable network infrastructure, cutting edge security technology and resourcing
of associated technical skills. 
1.2. The Education ICT Network infrastructure in its current design is no longer suitable to
support the future delivery of the education digital learning vision and strategy. It
requires a transformative technology upgrade, improved security, and reconfiguration
to support in-school and at home learning. The network was designed to support
learning styles applicable to a pre-pandemic in-school service only. There are
increased security threats and risks to the corporate and education networks by
retaining the education network in its present state. 
1.3. This report details the technical and security challenges and investment required to
transform and modernise the education network to improve service delivery and
implement the local and national education strategies for digital learning [1], whilst
mitigating the increased cyberthreats. A core objective is to create a secure and
flexible network architecture to support the current and future digital learning
requirements of the council’s young persons and professional skills development of
our teachers. 
1.4. Schools have invested significant funds in additional learning devices to supplement
the council’s PC rolling replacement programme. Improved network infrastructure will
sustain this investment and provide the capacity to support the outstanding
commitment from the Scottish Government to ensure access to a device for every
child. 
1.5. Digital developments such as Artificial Intelligence [AI], augmented reality, virtual
reality, Internet of Things and use of data are evolving at a rapid pace and it is vital
that our network is robust and flexible enough to facilitate opportunities for all
learners to develop key skills in these areas. Pedagogical approaches such as
Page 145 Agenda Item 5b

Page 146

gamification can break down barriers to learning and provide multiple alternative
paths to attainment and achievement for all learners. 1 
1.6. Cyber attacks on education establishments are rising exponentially, with secondary
schools and higher education establishments at most risk due to their high reliance
on IT and digital learning platforms. These establishments may be targeted by
criminals because of the sensitive nature of data that may be held or accessed by
user devices, which are also vulnerable to email phishing and malware attacks
without robust device management policies. 
1.7. Education Network Review
These priorities and challenges were posed in 2022 to Insight UK Ltd., a specialist
technical consultancy, to review and recommend technology solutions to address the
identified business objectives, mitigate security risks and transform the education
network to be fit for the future. In summary the conclusions and recommendations
are:
• The network in its current configuration, along with associated security systems
and device management software, is neither agile enough nor capable of
supporting secure and efficient delivery of the education service’s strategic vision
for digital learning. 
• To mitigate the increasing cyber security threats and risks to our network, and
support the aspiration for hybrid learning (devices used at school and home),
investment in ‘zero trust’ network security technology in conjunction with network
traffic redesign and improved device management, is essential to provide the
required flexibility and future proof the network. This is crucial as the council
migrates towards a single MS365 tenancy supporting both the corporate and
education environments.
• Insight UK has considered the technical and operational aspirations and
challenges, the council’s wide area network (WAN) model and the particular
bandwidth restrictions across the area [note 2]. 
1.8. ICT does not have the resource or capacity to undertake a strategic transformation of
this scale and complexity without significant investment in hardware and software
solutions, and additional engineering resources. It is anticipated a programme of
works could take up to two years to fully deliver, and due to the rising security
threats, commencement by Summer 2024 is recommended. 
1.9. Outline Costs
Initial estimates based on medium priced Zscaler technology were provided by
Insight UK in 2022 and are presented as Option1. ICT has subsequently undertaken 
2 Note: National and Scottish Governments have pledged funding to deliver improved bandwidth to harder to reach areas
across the UK e.g. Reaching 100 programme and Rural Gigabit Connectivity Programme. These programmes have been very
slow to deliver and Argyll and Bute continues to suffer with delayed rollout schedules.   
Page 146

Page 147

a proof of concept exercise working with our technology partner, Cisco Solutions,
based on its flagship network security solution Cisco Umbrella. Repackaged and
repriced licensing make it more affordable and achievable than previously thought
(option 2). Refer also to Appendix 1 for a breakdown of technology solutions
proposed, and the benefits/outcomes to be realised.
Two options to resource the installation and implementation have been considered: 
Option 1: external implementation resources using Insight UK and Zscaler
technology
Initial capital cost: £1,762,950
Annual revenue: £552,000
The initial capital cost includes outsourced installation and initial implementation at
an additional cost of £961,500. Additional ICT engineering resource would still be
required post implementation and ongoing maintenance and support. The 5 year cost
projection for option 1 is forecast at £4,544,950.
Option 2: in-house implementation through additionally recruited engineering
resources and Cisco Umbrella. 
Initial capital cost:  £327,050
Annual revenue year 1: £295,000 
Option 2 is preferred and represents the most economic and sustainable approach.
The 5 year cost projection for the education network infrastructure and security
upgrade programme is estimated at £1,908,716. Refer also to Appendix 2 for 5 year
cost table.
1.10. Funding Sources
• ICT has identified a one-off contribution of £81,500 from the ICT capital budget
allocated to replace red risk education network equipment between 2024/25 and
2025/26 as higher specification equipment would be necessary. 
• Education service has identified a contribution of £460,000 from earmarked
reserves pertaining to covid related education fund [£310,000], underspend from
Skype for Business for education [£10,000], and education transformation fund
[£140,000]. 
• The revenue model would require an ongoing cost and demand pressure for 2 x
senior engineers of £115,000; and to education services £180,000 in 2025-26
and 2026-27, rising to £233,000 from 2027-28 onwards for additional specialist
software licensing to deliver the required level of secure flexibility. 
2. RECOMMENDATIONS
That Members:
2.1. Note the need for the Education Service to deliver service improvements in
Argyll and Bute and broaden available curriculum offerings across schools
Page 147

Page 148

through digital learning provision; and that Option 2 will transform and
modernise the education network to deliver the same level of security, equity
and flexibility to education users as corporate network users.
2.2. Note the increased security threats and business continuity risks to the
education and corporate networks by retaining the education network in its
present state.
2.3. Note the optimum approach is a combined use of technologies which cannot
be considered in isolation, with associated ICT resources to deploy and
maintain this more complex environment. There is no scope to only
implement certain aspects highlighted in this paper as all are interlinked.
2.4. Note that a total of £81,500 has already been secured from the ICT capital
programme for investment in the education network in 2024/25 and 2025/26,
and that a further capital investment of £245,550 and annual revenue
investment of £295,000 is required to fund option 2 in 2025-26 and 2026-27
rising to £348,000 from 2027-28 onwards. This represents an overall saving
in year 1 of £1,692,900 against option 1. 
2.5. Agree allocation of identified education earmarked reserves of £460,000 in
addition to reallocation of an estimated £60,000 underspend from the school
wifi improvement project fund, reducing year 1 capital and revenue
requirement to £20,550. 
2.6. Agree the annual revenue requirement for specialist software licensing of
£180,000 in 2025-26 and 2026-27, rising to £233,000 from 2027-28 onwards,
as a future cost pressure to education service.
2.7. Agree the annual revenue requirement for additional engineering resource of
£115,000 as a future cost and demand pressure for ICT. Any pay uplifts
associated with the new posts will be included as part of the routine salary
budget setting process. 
Page 148

Page 149

3. INTRODUCTION
3.1. The vision for digital learning in Argyll and Bute, as defined in the council’s Digital
Learning Strategy 2021-2024 (under review), is in line with Education Scotland’s
Digital Learning and Teaching Strategy for Scotland. Our aspiration also takes
cognisance of the six core anchors that underpin the role of the local government
sector of the future as outlined in the Improvement Service publication ‘Delivering a
future for Scottish local authorities’3 , particularly the ‘anchors’ of: design for people’s
need, create digital, design and technology enabled transformation and tackle
inequality and meet the needs of all citizens. 
The work that we envisage in this area provides an exciting opportunity for us to take
radical action in order to open up a wide range of opportunities and benefits for the
children, young people and communities of Argyll and Bute. We know that digital
developments such as AI and use of data are evolving at a fast pace and therefore it
is vital that our network can facilitate opportunities for all learners to develop key
skills in these areas. Pedagogical approaches that rely on a robust digital network
such as gamification can break down barriers to learning and provide multiple
alternative paths to attainment and achievement for all learners. 
3.2. The Education ICT Network in its current design can no longer support the future
delivery of the education digital learning strategy. It needs a transformative
technology upgrade, improved security, and reconfiguration to support in-school and
at home learning. The current network was designed to support learning styles
applicable to a pre-pandemic in-school service only. There are increased security
threats and risks to both the corporate and education networks by retaining the
network in its present state. 
3.3. This report outlines the challenges and investment required to transform and
modernise the education network to deliver the national and local education
strategies for digital learning and improve service delivery. It sets out the key
technical issues and security risks that need to be addressed to ensure excellence
and equity in digital learning and deliver a flexible, secure education network fit for
the future. 
4.0 DETAIL
4.1.  Background
4.1.1.  In its present configuration, Argyll and Bute Council’s education ICT network
environment does not have the capacity or flexibility to accommodate the council’s
strategic plan for digital learning over the next five years, or the requirements of the
Scottish Government’s vision for digital access. 
4.1.2. There has been an exponential increase in the level of cyber attacks and
ransomware threats targeting UK education establishments that are considered by
cyber criminal organisations to present a higher level of security vulnerabilities and 
3 Improvement Service: Delivering a future for Scottish local authorities: the challenges they face, the
questions that need asking and a model for the future 
Page 149

Page 150

therefore more criminal opportunities due to general lack of cybersecurity investment,
the type of personal data held locally, poor password controls, decentralised local
device and network management arrangements. In 2022, the UK education sector
was hit by a far greater share of ransomware attacks than many other European
countries.  The National Cyber Security Centre (NCSC), part of GCHQ, has issued
notices that the probability of a major cyber incident in education sector is now very
high, as evidenced by the increasing number of blocked threats on the education
network this council has successfully defended so far. 
Prioritising enhanced security measures and strong access controls is therefore
critical to protecting against such ransomware and malware attacks, such as that
recently suffered by Western Isles Council
4.1.3. In addition, the number and variety of internet connected learning devices in schools
has grown significantly in the last four years and especially emerging from the
pandemic. There has been a major shift towards the use of GLOW, the national
digital learning platform, and other digital learning resources requiring an ‘always-on’
connection, which impacts available bandwidth, and requires suitable device and
content security protection.
4.1.4.  The Scottish Government has undertaken to provide access to a device for every
learner.  It remains unclear what the government’s commitment will consist of or
when, or indeed if, it will be delivered during the lifetime of this parliament. For this
reason, cognisance is taken of this potential commitment and the next iteration of the
service’s Digital Learning Strategy which anticipates requiring a next generation
network.
4.2. Key Objectives and Benefits 
In the context of the local and national strategies, the Education Service aims to
deliver enhanced learning experiences and improved outcomes for children and
young people through delivery of the following objectives and benefits, which also
carry risks and challenges that need to be addressed:
• learning devices can be safely used in school and at home, without
compromising the security of the council’s network and data;
• Teaching staff have the same level of flexibility of movement across school
sites and offices as corporate staff do for professional learning and
leadership, without the inconvenience of reconfiguring laptops; 
• The widening of the curriculum is open to all learners via digital means,
ensuring network performance and availability is maintained for all education
network users; this would enable an increased offer of pathways and courses
for example NPA games design or cyber security.
• A robust network for digital learning is capable of supporting new and
emerging technologies and new ways of learning such as augmented reality,
virtual reality, artificial intelligence and Internet of Things; and be agile enough
to adapt to the evolving digital education landscape and expectations of a
digitally connected society;
• Secure access to both corporate and education applications is available on
demand through use of affordable and sustainable alternative technologies,
Page 150

Page 151

without impacting on performance and productivity or compromising corporate
security.
• Creating opportunities for learners to develop a wider skill set, taking
cognisance of the fact that there is an aging demographic across Argyll and
Bute and therefore it is essential that our young people are equipped with up
to date employability skills which will enable them to contribute to and sustain
their own local industries and communities. 
• Enabling establishments to deliver relevant and high quality experiences that
would equip learners for the future world of work, this in turn could have a
positive impact on our own local industries and communities. 
4.3. Key Issues 
4.3.1. Argyll and Bute schools and pupils do not have the same equity of digital provision
and subject choice as many other local authorities do, primarily due to the
geographical spread of schools across the council area; lack of national digital
infrastructure and high cost of connection; and a shortage of specialist teaching staff
and accommodation in rural and island locations. 
4.3.2. Recent investment in virtual learning technology and audio-visual equipment has
enabled a higher level of learning choices, but puts pressure onto the network,
affecting other school user’s ability to access business and education applications
and other network resources. Investment in bandwidth expansion to fibre where
available, and consideration of alternative connection technologies such as satellite
broadband and 4g mobile broadband, are therefore necessary to ensure parity of
opportunity and maintain organisational productivity levels. 
4.3.3. The target minimum bandwidth forecast to support delivery of the objectives in the
Digital Learning strategy is estimated at 30Mbps for schools with approximately 20
pupils or less; and otherwise an allocation of approximately 1Mbps per pupil, where
technically and commercially viable. Schools with 1000 pupils or more would have
bandwidth of 1Gbps. In the current climate, these targets are aspirational only, given
that our suppliers cannot currently provide this level of bandwidth. Costs to increase
bandwidth have been prohibitively expensive due to the lack of BT infrastructure but
will be reviewed following negotiations with BT in relation to the SWAN2 contract and
consideration of alternative emerging technologies . 
4.3.4. It has long been this council’s aspiration for digital provision that every learner has a
device that can be used both within school and at home on a completely flexible
basis.  As a result, every device will require to have internet filtering security software
which works equally in school and at home.  
4.3.5. Corporate users enjoy a level of autonomy of network access with seamless
connection regardless of location. This is not yet available to teaching staff across
the school estate when going to another location. A greater number of teachers and
leadership staff are now working across several establishments and this arrangement
is often restrictive, where seamless network access is not available. 
4.3.6. Practitioners have indicated that they seek internet filtering solutions which are
specifically designed for educational use – allowing differentiation between what is
Page 151

Page 152

filtered in school and at home. Such software will filter internet content to ensure that
devices cannot be used to access material which is inappropriate, but is required to
be used in conjunction with additional and broader security infrastructure to stop
other security risks such as malware and ransomware attacks.
4.3.7 Schools have invested significant sums on classroom based interactive panels.
Education has an ambition to connect panels directly to the education network where
compatible with security management software. An upgraded network would provide
a prime opportunity to maximise the functionality of these panels and optimise
investment. 
4.4. Education Network Review
4.4.1.  Insight UK Ltd was commissioned in April 2021 to undertake a discovery session to
determine which networking changes and technologies were required to support a
new, secure “post pandemic” hybrid working environment addressing the key issues
and delivering the service’s aspirations for digital learning. It was subsequently
expanded to look at the implications on the network, systems, and support, of
allocating a device for every child should this government commitment be delivered.
4.4.2. Summary of Discovery session
• The network is designed to make best use of very limited available bandwidth and it
acts as a secure environment where managed devices can connect directly in school
or, in limited cases, over a VPN connection from home. Devices therefore currently
operate within a secure enclosed Education network. 
• The network in its current configuration, along with associated security systems and
device management software, is currently not agile enough nor capable of supporting
delivery of the education service’s strategic vision for digital learning. 
• To mitigate these risks to our data and protect our young persons and staff, and
support the aspiration for hybrid learning (devices used at school and home),
investment in ‘zero trust’ network security technology in conjunction with network
traffic decentralisation and improved device management processes is necessary.
• A new hybrid environment requires a considerably more flexible setup where devices
can be used at school or on home networks without the limitations associated with
connecting via a central on-premise based management system, but without
compromising security of our data and our young persons. This increased flexibility
introduces additional risk and the Insight recommendations cover three key
technology recommendations on how this risk can be managed:
1. Short Term device management requirements: – the need to address
immediate issues in the way devices are currently used, protected and
managed
2. Medium term device management and protection: – to ensure devices can be
used by a student or teacher working in any location in such a way that the
device, wider network, and all stakeholders are suitably protected.
3. Next generation network: Network redesign for the long term:– the network
not only needs more bandwidth, it also needs a complete redesign with
improved segmentation of education internet traffic from corporate
applications, and perimeter security solutions to deliver 1. and 2. above and
Page 152

Page 153

to support a hybrid workstyle. Insight UK recommends redesign and
investment in combined network and security cloud based traffic management
solutions (SD WAN/Direct Internet Access/Secure Access Service Edge
[SASE]) to make the most of the available bandwidth without impacting on
performance and productivity. 
4.4.3. The external implementation costs for the network redesign and segmentation project
at £961.5k (£713k plus £248.5k) did not provide for the ongoing management of the
new network which is expected to require two senior engineering resources. The new
environment will be considerably more complex and resource intensive than the
current network to maintain. However advancing recruitment of engineering
resources will enable ICT to undertake all the installation, implementation and
maintenance in-house. 
4.4.4. ICT does not have the resource or capacity to undertake a transformation of this
scale and complexity without these additional engineering resources in place from
commencement of the project. It is anticipated a programme of works could take up
to two years to fully deliver and therefore must be structured to prioritise the core
infrastructure and security recommendations to mitigate known risks and provide
sound foundations for growth. 
4.5. Technology Conclusions and proposals
4.5.1.  Short Term Requirements- Device Management and Protection
• There is a mandatory requirement to keep all devices up-to-date with security
patches and software updates.  IPads and Chromebooks are the device of choice
for online learning across a high percentage of schools. All schools also use
Windows devices offering pupils a broad range of digital skills and device
interfaces in readiness for entering the world of work, and for specialist subjects
such as business studies and graphic communications. 
• In many secondary schools devices are not currently adequately protected and
managed to the same standards as corporate devices presenting a high risk as
the council moves towards a single MS365 tenancy arrangement. Whilst the
longer term management issues are covered in this report, an immediate
requirement is to ensure basic protection on all devices is maintained through the
deployment and maintenance of an anti-virus system for Windows devices and
ensuring ipads and chromebook updates are promptly installed. The latter
devices are managed centrally via a Mobile Device Management solution, Jamf
for ipads and Google Admin Console for Chromebooks.
• A caching solution downloads the update onto a site based device which then
cascades the update to individual computers across the local area network.  This
prevents the network from becoming saturated with updates sourced unilaterally
by users from the device manufacturers.  
Immediate actions
• A local caching solution is recommended by Apple, using a macmini device on
every site using ipads. Capital spend will be in the region of £69,000, with
renewal required every five years.
Page 153

Page 154

• ICT provides Sophos anti virus software management across all school Windows
devices. Conditional access policies will be developed to only allow Windows
devices to connect to the network and MS365 tenancy where the anti virus
software is up to date.
• Maintaining device security requires teachers and school technicians to ensure
devices are available and in a state of readiness to receive security updates, and
to ensure Windows devices OS versions are kept current and anti virus software
updated. 
• A further immediate action is to enforce strong password policies for all education
staff to match that of corporate. It is an accepted risk that class accounts are
used by all primary pupils on all devices for quick connection and minimising
lesson disruption.  
4.5.2.  Longer Term Device Management and Protection: Chromebooks and iPads –
Endpoint Security
• A secure access service edge (SASE) is a technology used to deliver wide area
network and security controls as a cloud computing service directly to the source
of connection (user, device, Internet of things (IoT) device, or edge computing
location) rather than a data centre. Security is based on digital identity, real-time
context, and company and regulatory compliance policies. 
• Insight has recommended we implement a new managed SASE service. This
should be a DNS (secure routing system) + VPN based SASE solution such as
Cisco Umbrella or Zscaler. Such a system will secure “Content filtering” but also
put a full security “Wrap” around the device much like a traditional VPN but with
even greater security functionality and flexibility, allowing the device to connect to
any network but always be managed and protected. In order to ensure that these
products offer the flexibility required in an Education context, a further proof of
concept will be piloted in one of our larger primary schools.  
• The practice of routing all WAN (wide area network) traffic to corporate data
centres to access security systems adds network latency (a delay) when users
and their applications are dispersed and working from home, rather than in-
school. As the number of devices increase and the resulting network traffic
continues to grow, we are seeing evidence of network bottlenecks as traffic
attempts to get back to the data centres – Oban High School’s recent network
issues are an example of this.  A SASE service secures the end user device in
such a way that the user can go direct to their required application without being
redirected through the Council data centre. It is recognised as the only way
devices can be as usable as they need to be whilst still properly secured such
that the risks to the council’s other services are minimised.
• Zscaler and Cisco Umbrella are the two leaders in the SASE field. Costs vary but
we can expect to pay £275k to £600k per annum respectively depending on the
system selected. Cost estimates provided in this paper for option 1 are based on
Zscaler but subject to a procurement evaluation exercise and consideration of
newly available license bundles. 
• In addition to the SASE solution, Insight agreed that Lightspeed could be
considered for an education setting for additional content filtering alongside
Zscaler. Lightspeed Filter software is widely used in other authority Education
Page 154

Page 155

establishments but serves as a content filter only as it does not offer the required
device management or security wrap. A proof of concept exercise is being
investigated but would not be necessary if funding for Cisco Umbrella was
secured. 
4.5.3. Network Redesign for the long term: Redesign and segmentation of network;
upgrade network equipment
• The current Education network is not capable of supporting the digital
learning aspirations and hybrid environment. It sits on a mixture of medium
speed 100Mbps circuits and low speed DSL connections running at 8Mbps.
The network is limited by the availability of superfast broadband across Argyll
and Bute. As the telecoms suppliers make fibre services available, bandwidth
upgrades are considered. 
• Bandwidth upgrades alone are not enough to support the new hybrid
environment. Insight has recommended the replacement of existing
WAN/LAN hardware in all schools as it found the existing WAN/LAN
hardware does not have the required specification to accomplish the security
objectives. ICT has long term plans to upgrade networking equipment but
these would need to be accelerated through the capital programme to meet
the required specification for the new network.
• Estimated costs for upgraded network equipment capable of supporting layer
3 segmentation is estimated at £724,500 purchase cost plus £248,500
installation and deployment.
Insight has additionally indicated the following actions are required to deliver network
user flexibility and improved security:
• Implement improved wireless security in schools through 802.1x authentication
(pre preparation is underway for wired devices in schools but work and
equipment required for wireless)
• Development of a segmentation policy
• Implement network segmentation at layer 2/ Layer 3 level (Secure the traditional
Windows “domain” from non “domain devices”)
4.5.4. Recent changes to Cisco Umbrella SASE solution product packaging and pricing has
allowed ICT networks to undertake a proof of concept exercise on this market leading
technology. Testing in selected education environments indicates Cisco offers a
robust and more economically sustainable option requiring less equipment, licensing
and engineering resources than option 1 and Option 2.is the preferred technology
solution. A successful test has taken place on Ipads and Chromebooks and a further
test with Cisco has been arranged where we will install Umbrella across a larger
primary and test against the Lightspeed requirements/criteria.  
4.6.  Outline Costs
Initial estimates provided by Insight UK in 2022 have been adjusted for inflationary
increases. Refer to Appendix 1 for a breakdown of technology solutions proposed,
and the benefits/outcomes to be realised.
The 5 year cost projection for the education network infrastructure and security
upgrade programme based on Option 2 is estimated at £1,908,716. This comprises
Page 155

Page 156

Initial capital cost: £327,050 
Annual revenue: £295,000 year 1
Refer to Appendix 2 for 5 year cost table.
Description OPTION 1. Based on Zscaler OPTION 2. Based on Cisco
Estimated Costs Capital Revenue Capital Revenue
Network redesign,
segregation, equipment
upgrade        
-Network Equipment
purchase/upgrade £724,500.00   £250,000.00  
-Equipment installation
external £248,400.00   £0.00  
-Segmentation Policy £8,050.00   £8,050.00  
-Segmented network
Installation work £713,000.00   £0.00  
SASE solution licensing and
cloud services    £299,000.00   £180,000.00
Engineering resource [1]   £172,500.00   £115,000.00
Specialist content filtering
software   £80,500.00   
iPAD Caching solution
(80x£800) £69,000.00   £69,000.00  
TOTAL £1,762,950.00 £552,000.00 £327,050.00 £295,000.00
ICT CAPITAL PROGRAMME
CONTRIBUTION [2] £81,500.00   £81,500.00  
FUNDING REQUIRED [2]   £245,550.00 £295.000.00 
Notes
4.6.1. Resource options considered
Two options have been identified to implement the infrastructure improvement
programme:
Option 1: Insight UK to deliver the installation, configuration and implementation work
packages based on Zscaler solutions at a cost of £961,500. [1] However additional
ICT engineering resources (3 x senior engineers) would still be necessary to support
and maintain this more complex environment once implemented.
Option 2: An opportunity exists to cover both the implementation costs and on-going
staffing resource requirements by employing two new ICT Senior Engineers at a cost
of £57.5k each (£115k per annum) as a day 1 requirement. This addition to the
existing ICT team would mean all of the £961.5k implementation costs could be
covered by an internal team and would mean the new network could continue to be
managed in-house. In the first year alone the council would be saving £846,400
against the implementation cost projected by Insight. ICT has partnered with Cisco
for many years and its core networks are designed around this technology. These
skills synergies and shared learning reduces the resource required.  
Page 156

Page 157

Option 2 is therefore the recommended approach as it represents a best value and
more sustainable option for ICT to directly recruit engineering resources to undertake
the initial installation and implementation and retain the knowledge and skills in-
house.
4.6.2. Funding Sources
ICT has identified a contribution of £81,500 [2] from the ICT capital budget allocated
to replace red risk education network equipment between 2024/25 and 2025/26 as
higher specification equipment would be necessary. A further capital investment of
£245,550 is therefore required to fund option 2 which may be wholly covered from
identified education earmarked reserves.
Education service has identified a contribution of £460,000 from earmarked reserves
pertaining to covid related education fund [£310,000], underspend from Skype for
Business for education [£10,000], and education transformation fund [£140,000].
The revenue model would require an ongoing cost and demand pressure for 2 x
senior engineers of £115,000; and to education services £180,000 in 2025-26 and
2026-27, rising to £233,000 from 2027-28 onwards for additional specialist software
licensing to deliver the required level of secure flexibility. 
5.0 CONCLUSION
5.1.  In line with national digital learning policy, Argyll and Bute Council is committed to the
development of digital technologies to enhance learning experiences and improve
outcomes for children and young people. It will ensure that digital technology plays a
key role in ensuring the best start in life for Argyll and Bute’s children and young
people, that they have equity of choices and opportunities, and that they are
equipped with the skills and attributes to achieve success and fulfilment in their lives.
5.2. In Argyll and Bute, significant progress has been made towards an embedded and
productive role for digital learning through the effective collaboration of ICT and
Education services.
5.3.  In order for us to realise our vision for digital learning and teaching in Argyll and Bute,
we have identified a set of key ambitions for our network:
• A network that is safe, secure, reliable and fit for the future
• A network that is capable of supporting 1:1, new and emerging technologies
and new ways of learning such as augmented reality, virtual reality, artificial
intelligence and Internet of Things etc
• Devices are able to be used securely at home and in school
• Maximising functionality of interactive panels through connection to the
network.
• A solution to update software on iPads and Chromebooks
• A seamless internet content filter that has flexibility to be specific to education
needs
• Teaching staff have the same level of flexibility of movement across school
sites and offices as corporate staff
Page 157

Page 158

5.4.  Significant investment in security technologies and resources is necessary to
redesign the education network. The education network in its current state cannot
effectively or safely deliver the future strategic objectives for equity, achievement and
opportunities that the education service has committed to, without increasing the
overall security risk to the council. 
6.0 IMPLICATIONS
6.1 Policy Scottish Government Strategy: Digital Learning and Teaching Strategy  A&B
Corporate Improvement Plan, Education Service Strategic Plan
6.2 Financial: Additional estimated capital funding of £245,550 and additional annual
revenue funding of £295,000
6.3  Legal None
6.4  HR ; two additional ICT senior engineers to be recruited.
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics- none 
6.5.2   Socio-economic Duty none 
6.5.3  Islands: equity of curriculum choice for island schools improved through use
of innovative digital learning solutions
6.6 Climate Change: none 
6.7 Risk: if funding is not provided the cybersecurity risk to the councils corporate and
education network remains unacceptably high, delivery of the digital learning strategy
cannot be fully achieved and parity of connectivity between corporate and education
for teaching staff cannot be delivered
6.8. Risk: UNCRC is now enshrined in Scottish Law, our children and young people are
being educationally disadvantaged by the current limitations of the network and
infrastructure. 
6.9.  Customer Service: none 
Executive Director with responsibility for Education
Executive Director with responsibility for Customer Support Services
Policy Lead: Councillor Audrey Forrest
July 2024 
For further information contact: 
Wendy Brownlie, Head of Education: wendy.brownlie@argyll-bute.gov.uk 
Gerry Wilson, ICT and Digital Manager: Gerry.wilson@argyll-bute.gov.uk
Gary Clark, Digital Lead, Education. Gary.clark@argyll-bute.gov.uk
Page 158

Page 159

Brendan Docherty, Education Manager  Brendan.Docherty@Argyll-bute.gov.uk 
APPENDICES
Appendix 1 Summary of Required Actions, Benefits and estimated costings
Appendix 2 5 year investment profile
Page 159

Page 160

EDUCATION NETWORK : ISSUES, BENEFITS AND RECOMMENDATIONS                                                                                                       Appendix 1: Issues,
Solutions and Benefits Detailed breakdown 
Education’s requirement is for a modern, secure and flexible network that can support its digital learning aspirations, and the Scottish Government’s 1:1 device
commitment should that be delivered.  
• The network requires to be redesigned to provide improved security and flexibility 
• The network does not currently have the capacity to allow the education service to achieve the ambition of a device for every learner (1:1 deployment) 
• In addition to investment in bandwidth, device management and protection, there is a requirement to upgrade network hardware in all schools to efficiently
manage network traffic. 
To future proof the network and ensure that Education can deliver on the statutory duty, there are a number of required network upgrades which are detailed below.   
Timescale Issues/Impact Recommendation/proposed
solution
Benefits Estimated cost
Network re-design, segregation and equipment
Based on Option 2 – All installation work carried out by ICT
Short
Term
12-18
months
• A complete redesign of the education
network is required to modernise and
future proof the infrastructure.  This
upgrade is required to ensure that
Education can deliver on their
statutory duty and to introduce the
ability for school devices to be used
at home on the Internet.
• Segregation of network traffic is
recommended to separate admin
data (e.g. SEEMiS) and learning and
teaching data.
• Networking equipment in schools is
at or nearing end of life, this impacts
on performance and overall user
experience.  This equipment must be
upgraded with a higher specification
of equipment (to support the new
segmented network) as part of the
network re-design.   
• Implement 802.1x
authentication  for improved
wireless network security 
(Underway for wired devices in
schools but work required for
wireless) 
• Implement network
segmentation at layer 2/ Layer 3
level (Secure the traditional
Windows “domain” from non
“domain devices”) 
• Capital is earmarked to replace
current obsolete equipment
over the next 5 years. 
However, this will not be
sufficient to upgrade the
equipment to the required
• Will provide improved access to the
internet and greater flexibility for learners. 
• Improved speed and functionality resulting
in improved user experience.
• Improved network security. 
• Improved user experience for practitioners
and learners. 
• All network devices and the new
segregated network will be fully supported
by ICT
• Clear support matrix in place
• Support provided to practitioners
and learners will be timely and will
improve user experience
• Minimisation of any device
downtime/impact on learners.
Full network re-
design and
segmentation
project 
c.£8000 to develop
a segmentation
policy. Install by
ICT Engineers 
2 new ICT Senior
engineers  at a
cost of £57.5k
each - £115k per
annum. 
£250k equipment
upgrade purchase 
Page 160

Page 161

• New environment will be
considerably more complex and
resource intensive than the current
network.
• A substantial increase in the
numbers of networked devices will
have an impact on the various teams
supporting them. 
standard to support more than
double the number of devices. 
• Opportunity exists to cover
both the implementation costs and
on-going staffing resource
requirements through option 2:
• IT Network Engineering
Resource: employing 2 new ICT
Senior engineers 
Education
currently makes an
annual budget
contribution of
£38,000 to IT for
technical support
and file and print
servers.
SASE Solution (bandwidth mitigation)
Short
Term
12-18
months
• Number of devices increase resulting
network traffic continues to grow, we
are seeing evidence of network
bottlenecks as traffic attempts to get
back to the data centres – Tiree and
Oban High School’s recent network
issues are an example of this.  
• This results in poor user experience,
slowing pace of lessons and
activities
• Procure SASE solution • A SASE service secures the end user
device in such a way that the user can go
direct to their required application without
being redirected through the Council data
centre 
• Currently all internet traffic is sent to a
Council data centre (Kilmory or John
Street).  A SASE solution bypasses the
data centre by taking traffic directly out to
the internet and improves the network
connection speed.   This will also improve
the user experience whilst bandwidth
upgrades are in progress.
• It is recognised as the only way devices
can be as usable whilst still properly
secured such that the risks to the council’s
other services are minimised.
Cisco Umbrella
£180k per annum
Caching Solution 
Short-
Medium
Term
• Requirement to keep all devices up-
to-date with security patches and
software updates.  
• Procure caching servers for
each establishment or cluster
with ipads
• The caching solution downloads the update
onto a device which then cascades the
update to individual computers across the
Capital spend will
be in the region of
£70,000, with
Page 161

Page 162

network (reducing load on school
bandwidth).  
renewal required
every five years. 
Internet Content Filter
Short
Term
12-18
months
• Council’s digital learning ambition
includes the aspiration for every pupil
to have a device, accessible both in
learning establishments and at
home.  This will require appropriate
and necessary device management
and security internet content filtering
software.
• Current product is suitable for
Windows devices but not flexible
enough to provide an acceptable
user experience for iPads or
Chromebooks due to the repeated
authentication pop ups which
significantly disrupt teaching and
learning, and have a negative effect
on pace of learning and  attainment
of pupils. 
• Call Scotland has expressed
concerns that the internet content
filter is disadvantaging pupils with
additional support needs due to
limiting access to accessibility
features and also multiple password
prompts.   
• Procure a content filter which is
learner friendly and provides a
seamless experience on iPads
and Chromebooks. 
• Improved content filter would minimise
requirement for repeated authentication
therefore greatly improving user
experience.
• A hybrid working environment will help to
address digital inequity when pupils are
outside of school. 
• A modern flexible internet content filter will
provide improved access to in built device
accessibility tools. 
• Ability to customise the Internet content
filter based on age and location of learners. 
Internet content
filter incorporated
within Cisco
Umbrella solution. 
[Option 1 proposed
£80,000 per
annum
(Lightspeed)] 
Page 162

Page 163

ADDITIONAL CONSIDERATIONS
Bandwidth
Short term
(12-18
months)
• 28 schools have bandwidth
connections of 10mb or less.
• Increased level of online learning
adds significant additional pressure
on the Council’s already stretched
education network connection.
• Under-provision of bandwidth
impacts learners’ experiences and
creates issues with online content
buffering and delayed loading times. 
This results negatively on pace of
lessons and activities and therefore
significantly impacts on learners’
experiences. 
• Network capability is limited by the
availability of superfast broadband
across Argyll and Bute but, as the
suppliers make services available,
bandwidth upgrades are considered. 
• Long delays from infrastructure
improvements and order to delivery
are typical of the industry and we
should expect any longer term
bandwidth upgrade project to be a
slow drawn-out process. However, it
is imperative that this is progressed
as improvements become available. 
• Target minimum bandwidth
forecast to support delivery of
the objectives in the Digital
Learning strategy is estimated
at 30Mbps for schools with
approximately 20 pupils or less;
and otherwise an allocation of
approximately 1Mbps per pupil,
where technically and
commercially viable. Schools
with 1000 pupils or more would
have bandwidth of 1Gbps. 
• IT has some budget available to
upgrade schools to a better
connection.  However, it does
not have sufficient budget to
provide connection speeds that
support Education Dept future
vision and aspirations. 
• Alternative connection methods
will be explored and tested, in
conjunction with traffic
management solutions for
bandwidth optimisation 
• Provision of fast Internet connections
across all education establishments to
provide robust connections to online
learning platforms such as GLOW
(including access to all Google and
Microsoft productivity tools).
• Commonality of timetable approaches will
ensure individual learners’ needs are met
through enhanced curriculum choice and
better equity of access to broader learning
opportunities. 
• Increased personalisation and choice
within learner pathways, more options in
terms of subjects and levels, wider access
to college, and other national courses.   
Subject to
separate options
appraisal following
conclusions of
negotiations with
BT in relation to
SWAN2 contract. 
Consideration of
alternative
technologies
where
commercially and
technically viable
e.g. Starlink
satellite
technology. 
Page 163

Page 164

Appendix 2: 5 Year investment profile. Based on Option 2 recommendation.
RECOMMENDED OPTION 2              
CAPITAL/ONE OFF Year 1 Year 2 Year 3  Year 4 Year 5 Total 5 years Assumption/Note
Network Equipment and services              
Network equipment upgrade £250,000         £250,000.00 5 [tbd] year equipment
replacement policy
Equipment Installation Services £0.00         £0.00 Subsumed into line 16
Segregation policy £8,050.00         £8,050.00 External consultancy
Caching solution -non Windows devices £69,000.00         £69,000.00 5 [tbd] year equipment
replacement policy
TOTAL CAPITAL EQUIPMENT AND SERVICES  £327,050.00 £0.00 £0.00     £327,050.00  
Less ICT Capital Contribution -£81,500.00         -£81,500  
Less Education Earmarking Contribution
(£460k total) -£245,550.00         -£245,550.00 Leaves balance of £214,450
Capital BALANCE REQUIRED £0.00         £0.00  
REVENUE              
Software licensing and support              
SASE solution licensing and cloud services £180,000.00 £180,000.00 £180,000.00 £180,000.00 £180,000.00 £900,000.00 Based on Cisco Umbrella Subject
to repricing and contract terms
Network Equipment licencing       £53,333 £53,333 £106,666  
Engineering Resources              
Senior engineers x 2 £115,000.00 £115,000.00 £115,000.00 £115,000.00 £115,000.00 £575,000.00
Pay uplifts will be included as
part of the routine salary budget
setting process
SOFTWARE AND SERVICES REVENUE £295,000.00 £295,000.00 £295,000.00 £348,333.00 £348,333.00 £1,581,666.00  
Less Education Earmarking Contribution
(from £214k balance) -£214,450.00         -£214,450.00   
Revenue BALANCE REQUIRED £80,550.00 £295,000.00 £295,000.00 £348,333.00 £348,333.00 £1,367,216.00  
TOTAL CAPITAL AND REVENUE 5 Year Cost £622,050.00 £295,000.00 £295,000.00 £348,333.00 £348,333.00 £1,908,716.00   
Page 164

Page 165

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES                                        15 AUGUST 2024 
CORPORATE DEBT RECOVERY POLICY 2024 
1.0 EXECUTIVE SUMMARY 
1.1 This report introduces an update to the Council’s Corporate Debt Recovery
Policy. The existing policy was last considered in 2017 and is in need of an
update as identified during a recent audit of the Sundry Debt Recovery process.  
1.2 The policy applies to various types of council debt, including Council Tax,
Housing Benefit Overpayments, Non-Domestic Rates, and Sundry Debtor
accounts. Key objectives include fair debt recovery, early debt resolution, and
support for customers facing financial difficulty. It also aims to balance
effective debt collection with sensitivity to customers' financial circumstances. 
1.3 The governance structure, roles, and responsibilities are clearly defined,
emphasising equitable treatment and compliance with legal obligations. Plans
for regular policy review ensures alignment with organisational goals and
evolving needs. 
1.4 Policy and Resources Committee are asked to consider this report and the
updated Policy outlined in Appendix 1. They are also asked to review
Appendix 2 which outlines the vulnerability and hardship protocol to be
considered by Debt Recovery staff when dealing with vulnerable customers in
hardship. 
Page 165 Agenda Item 6

Page 166

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES                                         15 AUGUST 2024 
CORPORATE DEBT RECOVERY POLICY 2024 
2.0 INTRODUCTION
2.1 The Corporate Debt Policy of Argyll and Bute Council represents a pivotal
framework governing the billing, collection, and recovery of council debt from
customers. This policy underscores the council's commitment to efficient and
compassionate debt management, emphasising equitable treatment and
proactive engagement with customers facing financial challenges. 
3.0 RECOMMENDATIONS
3.1 It is recommended that Policy and Resources Committee approve: 
(a) the updated Corporate Debt Recovery Policy detailed at Appendix 1. 
(b) the Vulnerability and Hardship Protocol detailed at Appendix 2. 
4.0 DETAIL
Policy Scope
4.1 The policies in Appendix 1 and 2 encompass various aspects of debt recovery,
including Council Tax, Housing Benefit overpayments, Non-Domestic Rates,
and Sundry Debtor accounts. It applies across all service units of the Council,
aiming to balance effective revenue collection with sensitivity to customers'
financial circumstances
Aims and Objectives
4.2 Aligned with the Council's vision for a successful and vibrant Argyll and Bute,
the Corporate Debt Policy prioritises effective debt collection while ensuring
fairness and equitability, supported by the Vulnerability and Hardship Protocol.
Key objectives include fair debt recovery, early intervention to prevent arrears,
and partnership with customers to agree on realistic payment plans based on
individual circumstances.
4.3 Issues with performance within the recovery of Sundry Debt in particular were
picked up by external consultancy during a Business Process Review in 2023
and by our Internal Audit team. Since then Legal Services and Financial
Services have been working together to make improvements across Sundry
Debt recovery. 
Page 166

Page 167

4.4 Improvements include identifying Departmental Debt Co-ordinators in areas
where we have a higher value of overall arrears to assist Financial and Legal
Services to recover the debt.  A new, proposed Data Dashboard will be used to
support the debt co-ordinators. 
4.5 Two temporary staff have been engaged in proactive Sundry Debt recovery for
some months now, significantly reducing the level of outstanding arrears. Since
1 October 2023, they have successfully collected over £1.233 million in debt that
had been referred for recovery action. This amount represents debt that was
already accounted for, not new funds available for spending.
4.6 Recovery performance in the areas of Council Tax, Non-Domestic Rates and
Housing Benefit Overpayment debt is considered to be strong, however there is
an understanding that more needs to be done in the area of protecting
vulnerable people from the standard Council Tax recovery process in general.  
4.7 We have recently entered into an arrangement with Argyll and Bute Citizens
Advice Bureau (ABCAB) where we are able to cross refer potentially vulnerable
people, this has gone well to date and we may roll this out to other advice
agencies such as Bute Advice Centre in the future. 
4.8 Our aim here is to protect in particular, people who are suffering some form of
mental health vulnerability, who are not protected or covered by existing Council
Tax regulations, discounts or exemptions but who need a little “breathing space”
to get back on their feet and deal with their statutory obligations to pay the tax.   
4.9 These individuals will be given a 3 month moratorium from standard Council Tax
recovery processes where this has been identified as an issue. This gives the
opportunity for advice agencies to meet with the people and support them,
providing us with information to understand what sort of payment plan is realistic
for them in terms of their ability to pay. This process is in line with the
Improvement Services report “Collaborative Council Tax Collection” seen here.
Governance: Roles and Responsibilities
4.10 The Corporate Debt Recovery policy delineates clear roles and responsibilities,
with the Chief Financial Officer overseeing financial arrangements and
operational debt collection, and the Head of Financial Services managing
uncollected debt. Service departments are responsible for rendering accounts
and resolving disputes promptly, while nominated debt co-ordinators act as
single points of contact for debt management within their respective services.
Equal Opportunities and Data Sharing
4.11 The Council is committed to delivering services in line with equal opportunities
legislation, ensuring consistent and fair treatment of customers. Data sharing is
facilitated to streamline debt recovery processes while adhering to Data
Protection legislation, ensuring customers are pursued by one body for all
council debts.
Communications and Sanctions
4.12 The Council emphasises proactive communication with customers, providing
clear information on payment obligations and available support services.
Sanctions, including appropriate fees and interest charges, are employed to
encourage prompt debt repayment.
Page 167

Page 168

Policy Review
4.13 Regular policy review ensures alignment with organisational goals and
legislative requirements, with revisions submitted to elected members for
approval. Changes to detailed procedures are approved by officers in line with
good practice, ensuring policy effectiveness and responsiveness to evolving
needs. 
5.0 CONCLUSION
5.1 The Corporate Debt Policy of Argyll and Bute Council reflects a commitment to
responsible debt management, customer support, and organisational
effectiveness. By adhering to the outlined principles and recommendations, the
Council can ensure equitable treatment of customers, maximise debt recovery,
and uphold its financial obligations while considering individual circumstances.
Regular review and adaptation of the policy will be essential to address
emerging challenges and align with organisational goals and legislative
requirements.  
6.0 IMPLICATIONS
6.1 Policy: Updated Policy for the Recovery of Corporate Debt and a Vulnerability
and Hardship Protocol
6.2 Financial; Aim is to maximise income due to the Council and minimise bad
and doubtful debt.  
6.3  Legal: All Debt Recovery activities will be undertaken in line with current
legislation under the Council Tax Administration and Enforcement Scotland
Regulations 1992 as amended, the Bankruptcy and Diligence Act Scotland
2017 as amended and regulations related to debt prescription. 
6.4  HR: Two temporary Sundry Debt Recovery Officers are in post for 18 months
to work through the backlog of uncollected Sundry Debt and proactively
recover new debt,
6.5  Fairer Scotland Duty: 
6.5.1   Equalities – EqSEIA complete and available on the website at Equality
and Socio-Economic Impact Assessments | Argyll and Bute Council
(argyll-bute.gov.uk) 
6.5.2   Socio-economic EqSEIA complete and available on the website at
Equality and Socio-Economic Impact Assessments | Argyll and Bute
Council (argyll-bute.gov.uk) 
6.5.3  Islands, EqSEIA complete and available on the website at Equality and
Socio-Economic Impact Assessments | Argyll and Bute Council (argyll-
bute.gov.uk)
6.6 Climate Change: None 
6.7 Risk: First time we will be proactively engaged in the recovery of Social Care
debt. This will be tackled sensitively but there is a risk that some vulnerable
Page 168

Page 169

citizens may be impacted. We will always seek details of support workers,
power of attorney etc where appropriate and necessary. 
6.8  Customer Service: More protection for vulnerable customers than in the past
from standard Debt Recovery activity in relation to Council Tax through joined
up working with Argyll and Bute Citizens Advice Bureau and Bute Advice
Centre. 
6.9 The Rights of the Child (UNCRC): None 
Executive Director/Section 95 Officer – Kirsty Flanagan 
9 July 2024                                               
Policy Lead for Finance and Commercial Services - Councillor Ross Moreland 
APPENDICES
Appendix 1 – Corporate Debt Recovery Policy
Appendix 2 – Argyll and Bute Council Vulnerability and Hardship 
For further information contact: 
Anne Blue, Head of Financial Services 
Anne.Blue@argyll-bute.gov.uk 
Fergus Walker, Revenues and Benefits Manager
Fergus.Walker@argyll-bute.gov.uk 
Page 169

Page 170

APPENDIX 1 – CORPORATE DEBT RECOVERY POLICY 
ARGYLL AND BUTE COUNCIL 
CORPORATE DEBT POLICY 
Page 170

Page 171

Paragraph  Table of Contents  Page   
1 Introduction 3   
3 Policy Scope 3   
Aims and Objectives 3   
7 Policy Vision 3   
8 Policy Objectives 4   
Governance 
9 Roles and Responsibilities 4   
17 Equal Opportunities 6   
19 Data Sharing 6   
21 Write-offs 6   
28 Communications 7   
30 Sanctions 8   
32 Policy Review 8   
Version Control 8   
Page 171

Page 172

Introduction
1. This corporate debt policy defines the principles that will be adopted when
undertaking the billing, collection and recovery of council debt from customers in
Argyll and Bute. It provides a framework to collect council debt effectively and
efficiently, but also with sensitivity to the circumstances of our individual
customers. In this respect, the policy aims to balance the conflicting priorities of
delivering high levels of collection in tandem with the provision of appropriate
advice and support to those who may be experiencing financial difficulty. 
2. For those who can pay, we want them to be in no doubt that we will take all
reasonable measures to recover what is owed. For those in financial difficulty, we
want them to know that our action will always be proportionate, compassionate
and where appropriate tailored to their individual income and expenditure
circumstances. 
Policy Scope
3. Argyll and Bute Council raises charges for a wide range of services that it
provides, as well as collecting local taxes. There are different systems and
methods used for billing, collection and recovery of a wide range of debts. This
corporate debt policy is over-arching and establishes general principles to be
applied consistently in relation to debt recovery. 
4. For the purposes of the corporate debt policy, council debt is defined as:
• Council Tax
• Housing Benefit overpayments
• Non Domestic Rates
• Sundry Debtor accounts (which cover all other amounts due to the
Council) 
5. The policy applies to all service units of the Council. It focuses on collecting the
sums due. The Council’s ability to deliver services which meet the needs of our
customers depends heavily on its success in collecting revenues.  However,
ability to pay is an important concern when undertaking debt recovery. 
6. This policy is supported by separate and specific recovery procedures for each
individual debt type. 
Aims and Objectives
Policy Vision
7. Our Corporate Debt Policy is aligned to the Council’s Vision for a successful,
vibrant Argyll and Bute with a growing population and a thriving economy. A
place where people want to come to live, to work and to do business. In
Page 172

Page 173

particular, our policy has effective and efficient debt collection at its core but
alongside equitability. 
Policy Objectives
8. The Council has a legal duty to ensure cost effective billing, collection and
recovery of all sums due to the Council.  The Council is committed to delivering
the highest level of customer service and supporting citizens and businesses as
much as we can. Within this context, the key policy objectives that will guide the
Corporate Debt Policy are: 
• to operate in a fair and equal way when recovering debt; 
• to seek to address debt issues as early as possible with a strong emphasis on
arrears prevention in order to minimise overall indebtedness and improve
collection rates across all debt categories; 
• to ensure that customers have a clear understanding of their responsibility to
pay and the associated consequences of deliberate non-payment especially
when they are able to pay; 
• to work in partnership with customers and their representatives to agree
realistic payments based on their circumstances; 
• to ensure that all council staff and council appointed debt collection agents
and sheriff officers work together efficiently and effectively and provide a
single co-ordinated approach in dealing with council debtors; 
• to support debtors in becoming reliable payers in the future through referral to
appropriate advice agencies; 
• to ensure that all debtor accounts are accurate 
• where appropriate debtors will be advised of relevant benefit entitlements or
tax and business rates reductions 
• to ensure that all customer engagements are in accordance with the
timescales within the Council’s Customer Charter. 
Governance
Roles and Responsibilities
9. The corporate debt policy is governed by the Council’s Financial and Security
Regulations and in particular regulations 7.39 to 7.47 under the heading of
“Income”. This sets out the responsibilities of both the Chief Financial Officer and
the Executive Director with responsibility for Legal and Regulatory Support.  The
former is responsible for the overall financial arrangements of the council
including the operational debt collection of all taxes, billing arrangements and
Page 173

Page 174

income recording. The latter is responsible for the discharge of uncollected debt.
Argyll and Bute Council constitution (argyll-bute.gov.uk) . 
10. The Chief Financial Officer is responsible for offering an appropriate range of
payment mechanisms to the council’s customers.   
11. All cashiers are responsible for ensuring that receipts are posted accurately and
on a daily basis, and with the appropriate reference number so that it can be
matched to the relevant council tax, non-domestic rates, housing benefit
overpayment or sundry debtor liability. 
12. Where debts are not paid promptly, the Chief Financial Officer is responsible for
ensuring that payment is pursued promptly, and where necessary, that the debt is
passed for appropriate action by the council’s in-house legal services, sheriff
officers or debt collection agents. 
13. As a general principle no unpaid or dormant debt will go longer than 42 days
without engagement with the debtor. 
14. Responsibility is delegated to service directors to render accounts for all work
done, goods supplied, services provided and all other amounts due and service
staff have direct access to the sundry debtors system to enable them to do this. 
15. Service departments are responsible for ensuring that any disputes in relation to
debts are resolved as soon as possible with relevant credit notes being
authorised and processed as appropriate.  Whilst disputes are unresolved,
accounts will be suspended from follow-up. 
16. Each service department will have a nominated debt co-ordinator who will act as
single point of contact (SPOC) for their service in respect of the its debt. They
will: 
• Be the recipient of monthly debt performance reports issued by the
corporate debt team with details of all debt outstanding for their service
and set against agreed performance targets 
• Be the first point of contact for the corporate debt team and legal services
team when they require information from the service to support attempts to
recover debt 
• Liaise with colleagues about problem debts with a view to gathering
information and sharing it with legal services and the corporate debt team 
• Be the first point of contact and liaison point on all inter-service processes,
procedures or systems issues, with a view to contributing positively to a
Page 174

Page 175

high-quality, fast learning and continuously improving corporate debt
management service. 
Equal Opportunities
17. Argyll and Bute Council is fully committed to delivering services in line with equal
opportunities legislation and policy. The Council will treat customers consistently
and fairly regardless of age, race, religion, gender, disability and sexual
orientation. 
18. Customers will be treated as individuals taking into account, wherever possible
and appropriate, their known personal circumstances. 
Data Sharing
19. The Council will adopt a corporate approach to sharing information where a
customer has multiple debts owing to the Council. This will be co-ordinated
through the Corporate Debt Recovery Team paying due regard to Data
Protection legislation. The information shared will only be used to ensure that the
customer will, so far as is possible, only be pursued by one body in relation to all
council debts. 
20. The Council will optimise its debt recovery performance by participating positively
in all existing and emerging cross-government data sharing initiatives. 
Write-offs
21. The Head of Financial Services is responsible for ensuring that all write-offs are
fully compliant with our Financial Regulations. In this respect the Head of
Financial Services, or their deputy should they chose one, is responsible for
authorising all debts submitted for write-off to the Executive Director with
responsibility for Legal and Regulatory Services. They are also responsible for
ensuring that there is a clear audit trail to support all debts submitted for write-off. 
22. Separate from this policy, there will be maintained detailed procedures for writing
off Council Tax Debt, NDR Debt, Sundry Debt as well as debt arising from
outstanding Housing Benefit Overpayments. However, it would normally be
expected that debts to be written off would be: 
• Cumulative debts under £50, where no payment has been received within
six months of sending the final demand 
• All debts where the Head of Financial Services or their deputy advises the
debt is irrecoverable or that legal action is unlikely to be cost effective 
• Gone aways, unable to trace 
• Deceased debtors with no estate 
Page 175

Page 176

• Accounts in liquidation or sequestration 
• Prescribed debt of time barred accounts 
• Miscellaneous category covering any other case where there are good
reasons for doing so having regard to the relative level of the debt and the
prospects and costs with securing payment. 
23. Once appropriate authorisation has been received, the write offs should be
returned to the Corporate Debt Team, who will ensure that the relevant systems
are updated and accounts adjusted for write-off. 
24. The debtor remains liable to pay. Therefore, if the debt has been written off and a
further instalment is received, the income must be re-credited to the appropriate
income code. 
Bad Debt Provision
25. The provision will be calculated using historical Council data, knowledge, and
experience, while considering relevant industry guidelines and Codes of Practice
that support the process. 
26. Specific debts may be incorporated within the Provision at the recommendation
of the Revenues and Benefits Manager 
27. Consideration must be given annually to the individual nature and collectability of
all large debts. However, the following can be used as guidance when reviewing
the necessary level of bad debt provision from year to year: 
• All accounts with a credit balance to be written off 
• All debt that has security attached to be fully provided for 
• The value of all accounts that are subject to any form of third party action
to be fully provided for. 
28. The overall provision levels must be reviewed annually by the Revenues and
Benefits Manager and updated recommendations made as appropriate to the
Head of Financial Services. 
Communications
29. Individual and business customers or their representative will be encouraged to
contact the Council as soon as they encounter payment difficulties. 
Page 176

Page 177

30. The Council will be proactive in its communications with customers and this will
be achieved as follows: 
• All contact information will be made clear and understandable on all
outgoing communications. 
• All communications should be jargon free and in plain English where
possible and help will also be provided where literacy issues exist. 
• In particular, clear information will be provided detailing the customer’s
obligations to pay and the consequences of non-payment at each stage of
the recovery process for each debt type. 
• Available payment methods will be clearly outlined to customers. 
• Access to money advice, debt counselling services and energy advice will
be actively advertised, encouraged and facilitated. 
• The Council will ask for and store customer telephone numbers and email
addresses securely to facilitate effective and efficient ongoing dialogue. 
• Services which deal with customer debt internally will work together in a
joined up approach to avoid placing undue pressure on customers who are
in debt. 
• The Council will embrace new technology to contact or remind customers
of outstanding amounts where possible e.g. text messaging and e-billing. 
• Bills, invoices, benefit award notifications and recovery notices will be sent
out promptly and in accordance with legal requirements. 
Sanctions 
31. To encourage prompt and full payment of debts from those who can pay, the
Council reserves the right to charge appropriate fees to cover the cost of
administering ongoing debt collection. 
32. In the case of commercial debt, the council reserves the right to charge interest
and fees on appropriate debt in line with legislation Late Payment of Commercial
Debts (Interest) Act 1998. 
Policy Review 
33. This policy will be kept under regular review and in the event that there is a
material change a revised version will be sent to elected members for approval. 
34. For as long as any changes to the more detailed procedures do not materially
affect the policy, they will simply be approved by officers in line with good
practice. 
Page 177

Page 178

Version v0C 8th July
2024
Proposed By Fergus
Walker
Revs and Bens
Manager
Date: 8th July 2024
Back to Contents
Page 178

Page 179

APPENDIX 2 – ARGYLL AND BUTE COUNCIL VULNERABILITY AND
HARDSHIP PROTOCOL   
A Protocol
for Considering
Vulnerability and Hardship 
Version 0a
Date: June 2024
Approved By: Fergus Walker 
Page 179

Page 180

Introduction
This Hardship and Vulnerability Protocol is over-arching and outlines the general
principles to be applied consistently in relation to debt recovery.
The Protocol applies to all service units of the Council and all types of debt. 
The Council’s ability to deliver services which meet the needs of our customers
depends heavily on its success in collecting revenues.  However, ability to pay is an
important concern when undertaking debt recovery, particularly when there may be
vulnerability or hardship. In such cases we should always take a more
compassionate and proportionate approach and wherever it is possible seek to
agree a special repayment arrangement.
Our challenge is to have a more consistent approach to considering whether or not
and to what extent it is reasonable to agree a deferred or reduced recovery plan with
a debtor, on the grounds that they might be vulnerable or might experience hardship
with a standard repayment plan.
This vulnerability and hardship protocol sets out how we intend to approach this debt
recovery challenge. It will apply to all our debtors. 
Executive Summary
We currently have no written guidance to help staff make a fair, consistent and
objective judgement when negotiating with a debtor, a reasonable amount and
period for repayment. Instead staff currently use their experience, common sense
and personal values, which can risk inconsistency.
In 2019 the UK government committed to and published guidance on giving debtors
more breathing space so that they can take control of their finances and put them on
a sustainable footing. Although highly informative, this guidance applies only to
England and Wales. The Scottish Government is on a similar path and a Bankruptcy
and Diligence (Scotland) Bill is progressing through parliament. 
The absence of written staff guidance and the emerging breathing space-type
initiatives have combined to drive forward the development of this vulnerability and
hardship protocol.
Our protocol and the processes that support it are consistent with the Breathing
Space approach as well as the important and clearly visible direction of travel in
Scotland. They have also been influenced by our engagement and consultation with
our third sector partners such as Argyll and Bute Citizen’s Advice Bureau (ABCAB)
and Bute Advice Centre (BAC) as well as our Sheriff Officer partners. 
Given that our own money advisors and third sector partners have core specialist
skills and experience in this area, they will play a key role in gathering information to
help us decide a fair, proportionate and viable debt recovery rate. 
Page 180

Page 181

The third sector money advice approach involves the completion of a Common
Financial Tool/Common Financial Statement. This approach requires the debtor to
complete a questionnaire which is extremely comprehensive and detailed with a full
focus on holistic debt management. The data informs an assessment of income and
expenditure.
For us the assessment of income and expenditure is often at the core of many debt
recovery negotiations. This process can be complex and can take time, so we will
only gather this information in circumstances in which the debtor may have difficulty
agreeing to our preferred standard repayment amount and recovery period. 
Our New Approach
Rather than engaging directly with the debtor on their specific income and
expenditure we will instead direct them to a money advisor.
The incentive for the debtor will be that where it is required and reasonable, we will
allow a 3 month moratorium on recovery action for all those who positively engage in
seeking money advice.
We recognise that vulnerability is on a spectrum of risk. All customers are at risk of
becoming vulnerable, but this risk is increased by having certain characteristics of
vulnerability. These could be poor health, such as cognitive impairment, life events
such as new caring responsibilities, low resilience to cope with financial or emotional
shocks and low capability, such as poor literacy or numeracy skills. 
Considering Vulnerability
There is no exhaustive or definitive list of vulnerability characteristics, but drawing on
the guidance from the Financial Conduct Authority and the guidance in England and
Wales given to enforcement agents, we would regard the following groups to be at
some risk of vulnerability:
• the elderly (difficult to define, but we will broadly regard the over 75s as
elderly);
• people with a disability;
• the seriously ill, both mental and physical;
• the recently bereaved; 
• some single parent families; 
• some pregnant women; 
• some recently unemployed people; and, 
• those who have obvious difficulty in understanding, speaking or reading
English. 
Page 181

Page 182

We will also regard the following groups to be at some risk of vulnerability, People
with:
• chronic gambling problems, 
• chronic alcohol or drug dependency issues
• significant other debts – Subject to the following Breathing Space exceptions
below: 
o debts incurred as a result of fraudulent behaviour
o fines imposed by a court, including criminal fine
o confiscation order
o child maintenance payments and debts that arise after an order made
in family proceedings
o any residual social fund loans
o student loan
o personal injury liabilities
We will keep this definition in view and review it when further guidance emerges from
the Scottish Government. 
Where the vulnerability is temporary, we will set a diary date to review the position. 
Where the vulnerability is chronic and the customer would experience real, obvious
and indefinite hardship repaying their debt we will consider how it might be written
off.
With specific regard to Council Tax and Non-Domestic Rates (NDR), we will fully
consider how liability might be exempted or reduced under the legislation. 
With our own money advisors as well as our third sector partners, we will have a
focus on income maximisation, particularly underlying entitlement to benefits, for all
presenting debtors.
Considering Hardship
Not all vulnerable people will experience hardship paying their debt in good time. 
The key to considering the issue of hardship for those customers vulnerable or
otherwise, is to gather and analyse details of their income and expenditure.
If we cannot agree a reasonable rate of recovery as part of an early telephone call,
we will ask the customer to seek advice and guidance from our own money advisors
or third sector partners at Argyll and Bute Citizens Advice Bureau. In return and
where appropriate there will be a 3 month moratorium on the debt. Money advisors
will work with the debtor and help them make their best repayment plan offer to us. 
If the customer is on a relevant DWP benefit, we will recover the debt directly from
their benefits at the prescribed rate which is £4.55 per week for council tax debt and
£13.65 per week for Housing Benefit Overpayments.
Should a customer’s best repayment offer fall short of the recovery from ongoing
benefit rate and their financial circumstances are such that there is no benefit
Page 182

Page 183

entitlement, we will seek, as an absolute minimum, to set the recovery at the
prescribed recovery from benefit rate, in the interest of fairness.
Working Closely With Our Enforcement Partners
In its collaborative Council Tax Collection publication the Improvement Service
states the following about Enforcement:
Enforcement action, in which diligence is a consideration, should always be
proportionate, viewed as a last resort and never be batch-driven or viewed as a
convenient means of cutting costs.
This protocol recognises this view in principle. However one of our difficulties is a
product of customers ignoring our reminder notices and avoiding engagement. In
such cases we often have no knowledge of potential vulnerability or hardship.
In reality there are occasions when vulnerability or hardship cases are routinely
referred to the Sheriff Officer after Summary Warrant has been obtained from the
sheriff court. In such cases the true status of the debtor might only become known as
the Sheriff Officer goes through the diligence processes. When these situations arise
we will liaise closely with the Sheriff Officer in setting the right course of action, which
is likely to include the debt being returned to the council. In such cases we would
wherever appropriate, seek to remove fees or charges placed on the debtor as part
of the summary warrant and diligence processes. 
In circumstances where it is known to us that the customer is vulnerable or
experiencing hardship, we will not routinely seek Summary Warrant for the recovery
of tax debt and transfer these debts to the Sheriff Officer. We will work closely with
our own and third sector money advisors, to find a proportionate and fair solution
which maximises debt recovery and simultaneously protects the debtor from the
standard recovery process, additional fees and charges. 
Fergus Walker
Revenues and Benefits Manager
June 2024 
Back to Contents 
Page 183

Page 184

This page is intentionally left blank

Page 185

1 
ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE 
LEGAL AND REGULATORY SUPPORT                                          15 AUGUST 2024   
NATIONAL CARE SERVICE – STAGE 2 SCRUTINY CALL FOR VIEWS 
1.0 EXECUTIVE SUMMARY 
1.1 The Scottish Parliament’s Health, Social Care, and Sport Committee launched a
Call for Views on 1st July as part of its Stage 2 scrutiny of the National Care
Service (Scotland) Bill. 
1.2 Officers have considered the 9 key questions posed as part of the Call for Views
and attached at appendix 1 is the proposed response, which is due to be
submitted by 30th August deadline.  This response is in line with the previous
submissions made by the Council. 
1.3 Members are asked to:- 
a) Consider and agree the draft response detailed at appendix 1; and  
b) Agree that Officers arrange for the approved response to be submitted by
30th August 2024 deadline.   
Page 185 Agenda Item 7

Page 186

2 
ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE 
LEGAL AND REGULATORY SUPPORT                                          15 AUGUST 2024 
NATIONAL CARE SERVICE – STAGE 2 SCRUTINY CALL FOR VIEWS 
2.0  INTRODUCTION 
2.1 The Scottish Parliament’s Health, Social Care, and Sport Committee launched a     
Call for Views on 1st July as part of its Stage 2 scrutiny of the National Care Service
(Scotland) Bill. 
2.2 Officers have considered the 9 key questions posed as part of the Call for Views
and attached at appendix 1 is the proposed response, which is due to be
submitted by 30th August deadline.  This response is in line with the previous
submissions made by the Council. 
3.0 RECOMMENDATIONS  
3.1    Members are asked to:- 
a) Consider and agree the draft response detailed at appendix 1; and  
b) Agree that Officers arrange for the approved response to be submitted by
30th August 2024 deadline. 
4.0 DETAIL 
Background/Context 
4.1 The Independent Review into Adult Social Care (IRASC) recommended the
establishment of a National Care Service (NCS).  Subsequently, the Scottish
Government launched the Consultation “A National Care Service for Scotland” on
9th August 2021 to seek views from a range of stakeholders on the creation of a
NCS.  The IRASC was commissioned to recommend improvements to adult
social care, however this consultation extended the scope of the review to include
other service areas such as children and families, community justice, alcohol and
drug services, mental health services, and social work. 
4.2 Taking account of discussions and feedback received from elected members,
including at the Seminar held on 21st September, and at Council on 30th
September 2021, Officers developed a response to the consultation, which was
agreed at the Special Council meeting held on 28th October 2021.  The final
Page 186

Page 187

3 
response was submitted in advance of the 2 November 2021 deadline and can
be accessed here.   
4.3 Following the National Care Service Consultation the Scottish Government
introduced the National Care Service (Scotland) Bill to the Scottish Parliament on
20th June 2022.  The Bill proposes to establish a National Care Service and allow
the Scottish Ministers to transfer social care responsibility from local authorities to
a NCS through secondary legislation. 
4.4 In addition to the 2021 consultation, the Scottish Government hosted a number of
NCS forums across different communities in Scotland during summer/autumn
2023.  The purpose of these events was to inform work to co-design the new NCS
with those who receive or deliver social care, social work and community
healthcare support.   
The reports published by the Scottish Government on each of these themes can
be found on their here. 
4.5 Progress of the National Care Service (Scotland) Bill 
4.5.1 The Bill establishes the National Care Service.  The Bill allows Scottish Ministers
to transfer social care responsibility from local authorities to a new, national
service. This could include adult and children’s services, as well as areas such as
justice social work. Scottish Ministers will also be able to transfer healthcare
functions from the NHS to the National Care Service.   
Stage 1 – General Principles 
4.5.2 At this stage of the process the Bill is given to a lead committee – in this instance
the Health, Social Care and Sport Committee.  The lead committee is
responsible for examining the Bill and gathering views from a range of
stakeholders including experts, organisations and members of the public.  A
stage 1 report is then written, usually setting out the views collated and making
recommendations on whether the Parliament should support the main purpose
of the Bill. The Parliament then debate the Bill and decide whether it should go
to stage 2, or be rejected. 
4.5.2 As part of the evidence gathering process at stage 1 a Call for Views was issued
to the Council by the Health, Social Care and Sport Committee on 8th July 2022,
inviting comments by 2nd September 2022.  A response was coordinated by the
Council’s NCS Officer Working Group, which was in line with the initial
consultation response agreed by Council in October 2021, setting out our main
concerns with the Bill, and the process undertaken to date. The Council’s
response to the Call for Views was agreed by ELT on 30th August 2022, and a
copy can be found here. The Bill passed Stage 1 (approval of general principles)
on 29th February 2024. 
Stage 2 – Changes to Detail 
Page 187

Page 188

4 
4.5.3 A meeting of the Health, Social Care and Sport Committee took place on 26th
March 2024, where they considered the Bill (in a private session). Therein the
Committee considered its approach to the scrutiny of the Bill at Stage 2 and
agreed, subject to the Scottish Government providing draft versions of its Stage
2 amendments, to undertake further scrutiny of those draft amendments once
they were made available. 
4.5.4 The Health, Social Care and Sport Committee have now issued a call for written
evidence to obtain views on the draft amendments the Scottish Government is
proposing to make to the Bill at stage 2 - details of the proposed amendments,
and the full suite of information provided by the Scottish Government, can be
found here. 
4.6 Our Response 
4.6.1 Officers have considered the 9 key questions being posed as part of the Call for
Views and have drafted the response detailed at appendix 1 of this report.  Our
response is in line with previous submissions made and is cognisant of the
extensive discussions and negotiations that COSLA have been engaged in with
the Scottish Government concerning a number of ongoing challenges and risks
in respect of the NCS. There is growing disappointment from COSLA that these
negotiations have not resulted in positive outcomes, with a number of matters
remaining unresolved, including:- 
• Substantial delays in the detailed amendments from the Scottish
Government being produced;
• No formal agreement on precise responsibilities, organisational status, and
accountability arrangements of the NCS National Board, including its
interaction with the local system and the details of a Support and
Improvement Framework;
• Children’s and Justice Social Work Services (CSJSWS) – Scottish
Government and COSLA have been unable to reach an effective or
acceptable compromise in respect of whether CSJSWS should form part
of the NCS. Despite negotiations since February, the Scottish Government
remain intent in fully incorporating CJSWS, whereas COSLA are of the
view that the delegation of CJSWS should remain a local decision and not
fall within the scope of NCS. The latter view is in line with the comments
provided by the Council in response to the NCS consultation in October
2021.  
• Power for Scottish Ministers to directly fund local Integration Authorities -
currently, funding for Integration Authorities is routed via the local authority
and NHS Board. Scottish Government continue to seek the legislative
power for Scottish Ministers and/or the NCS National Board to be enabled
to provide direct funding to integration authorities.  There remains
significant concerns over the potential implications such a power could
have.
• National Social Work Agency (NSWA) – no formal agreement on the
structure of the agency and the detail of accountability arrangements
between Local Government, Scottish Government and the NSWA. 
Page 188

Page 189

5 
4.6.2 Officers will continue to monitor progress with the Bill and pick up any actions
required from the Council, for example responding to any further calls for views
and the continuation of briefings for the Leader/Chief Executive ahead of COSLA
meetings.   
5.0 CONCLUSION 
5.1 This report invites members to consider and approve the proposed response to
the call for views as part of the Stage 2 scrutiny of the National Care Service
(Scotland) Bill.  If agreeable, Officers will arrange for the final response to be
submitted by the 30th August deadline.   
6.0 IMPLICATIONS 
6.1 Policy - none arising from this report
6.2 Financial – envisage significant investment will be required to deliver the
proposals   
6.3  Legal – new legislative requirements will be introduced if Bill is enacted
6.4  HR - Significant potential implications for Council employees working in social
work and social care
6.5  Fairer Scotland Duty: none arising from this report 
6.5.1   Equalities - protected characteristics 
6.5.2   Socio-economic Duty 
6.5.3  Islands 
6.6 Climate Change - none arising from this report 
6.7 Risk - none arising from this report
6.8  Customer Service - none arising from this report
6.9 The Rights of the Child (UNCRC) - none arising from this report 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
Policy Lead for Care Services – Councillor Dougie McFadzean 
24th July 2024                                                   
Page 189

Page 190

This page is intentionally left blank

Page 191

Appendix 1
NCS Call for Views – Stage 2 Scrutiny
If you are commenting on individual Scottish Government draft amendments in your
response, please identify the amendment or amendments either:
• By reference to the provisions in the marked-up Bill that they would either add
or remove – e.g. “the new section 1A of the Bill” or “the removal of sections 2
and 3 of the Bill”; OR 
• By reference to where they arise in the marked-up Bill, indicating the
numbering of the provisions and the colour used (blue, red or both) – e.g. “the
amendments shown in red and blue in section 1, subsection (1)(c)”; OR
• By reference to the numbered list of Scottish Government draft
amendments – e.g. “draft amendments PCO82, PCO95 and PCO83”. 
1. What is your view of the proposed National Care Service strategy (see
proposed new sections 1A to 1E)? 
We are generally in agreement with the provisions to review the NCS
principles and regarding the NCS Strategy (including its periodic review).
However it is important to note that the strategy must recognise the need to
provide locally tailored solutions and should therefore be designed in a
manner that has regard to the specific needs of different areas, such as rural
authorities like Argyll and Bute. 
We would also suggest that local authorities and health boards are added to
the list at Section 1A(2)(b) (those whom the Scottish Ministers must elicit the
views of in reviewing the NCS principles). 
It would be helpful to obtain clarity on whether the NCS will be facilitating the
implementation of the principles outlined, for example via additional funding. 
2. What is your view of the proposal to create a National Care Service
Board, and the provisions about the role and functions of the Board (see
in particular new Chapter 1B of Part 1, and new schedule 2C)? 
The purpose of a new NCS Board to monitor progress, ensure standards and
improvement at a national level is a welcome addition to the Bill, in order to
further the aim in ensuring consistency of care across Scotland. In meeting
this aim, there needs to be recognition of local flexibility to set standards and
to determine local solutions that reflect local circumstances.   
As an authority we do question why the approach has been taken to establish
this body via the proposed NCS Framework, as opposed to adding it into the
existing 2014 Act framework that exists for integrated authorities? 
Page 191

Page 192

Further, there are concerns around the proposed power for Scottish Ministers
to directly fund local Integration Authorities.  Currently, funding for Integration
Authorities is routed via the local authority and NHS Board. There remains
significant concerns over the potential implications such a power could have. 
Having regard to the proposed membership of the NCS Board, in terms of
Paragraph 17(8)(b) to the new Schedule 2C, we note that (as a minimum)
there would be only one individual appointed to the Board to represent local
authorities. In reality, the needs and circumstances of all local authorities
across Scotland are very diverse. The challenges faced by, for example, a
rural and/or island authority differ significantly from those faced by a central
belt urban authority. Therefore, we would suggest that the local authority
representatives on the Board should be more than one, in order to reflect the
diversity of local authority areas and circumstances across the country. 
It is further noted, in terms of Paragraph 17(8)(c) to the new Schedule 2C, that
there would be at least one individual appointed to the NCS National Board to
represent health boards. This raises the question of reciprocity in membership
of the relevant organisations. There is no local government representation on
the NHS Scotland Board despite the current heavy focus on delayed
discharge, when community care has greater pressures. 
3. What is your view of the proposal to establish National Care Service
local boards and to remove other integration models (see in particular
Chapter 1A of Part 1, and new schedules 2A and 2B)? 
The proposal to remove other integration models, with the purpose of
ensuring consistency across the country, is noted. However, we would
question why this is being done as part of the creation of a brand new (NCS)
framework. That end could have been achieved by amending the 2014 Act
(as proposed) alone as that would have exactly the same effect on the
existing HSCPs. In our view, that would be a far more proportionate change to
make to the existing arrangements, and to build on the progress that has
been made thus far in terms of integration. This reflects the views we
expressed whilst this Bill was at Stage 1. 
4. What is your view of the proposed new provisions on monitoring and
improvement (see new sections 12K and 12L) and on commissioning
(see new section 12M)? 
Sections 12K and 12L clearly set out how the NCS Board would monitor
improvement in care across the country in our view. We would stress that an
important part in effecting any improvement is working collaboratively and
supportively with the local authorities and/or health boards who carry out the
integrated functions in question. 
In relation to Section 12M (Commissioning) – no real issues with the wording
of the draft section, however there are concerns about what is commissioned
and how it is specified.  National approaches do not tend to work for rural
Page 192

Page 193

areas and there should be safeguards in place to avoid solutions that are not
fit for purpose. 
Separately, the Council have responded to the request issued to Heads of
Procurement seeking views on the amendments related to procurement, and
specifically the third sector. 
5. What is your view of the proposed new provisions to designate a
National Chief Social Work Adviser and for the creation of a National
Social Work Agency (see new section 26A)? 
The role of a new National Chief Social Work Adviser, and the National Social
Work Agency, is outlined with the new Section 26A of the Bill. However, we
would suggest that further consideration/detail is required about how the
National Chief Social Work Officer would interact with Chief Social Work
Officers of local authorities – who are existing statutory officers with a range of
legislative duties and functions. 
In addition, and in line with previous comments provided as part of earlier
consultations on NCS, further clarity is required on the role of the NSWA to
avoid duplication of roles with existing care regulators – such as the SSSC
and the Care Inspectorate.  For example, concerns have been raised about
the suggestion that NSWA should have a lead role in setting a national
approach to terms and conditions, including pay, which could lead to equal
pay issues. 
In respect of workforce planning, we feel that local planning should continue
to reflect local needs, but the proposed NSWA does have the potential to fill a
gap in creating nationally available and equitable access to learning and
development for trainee social workers. It could also enhance and strengthen
professional standards and provide a national pool of advisers/mentors/
supervisors and consistency of practice for all social workers. This would
remove the inequities currently occurring in HSCPs/smaller councils where
budgets are constrained, learning and development is restricted and trainee
places are limited purely due to budget. A national agency would be able to
assess national workforce requirements and skills gaps and liaise with
national providers – FE/HE and funding bodies - to ensure that there are
sufficient and affordable training places for social workers.  They would also
be able to continue to influence government spending plans for the
Apprenticeship Levy, where spending currently does not reflect the needs of
the public sector, particularly in this area of national workforce need. 
At a national level, there is a lot of work underway between SPDS, the
Improvement Service and SOLACE on workforce planning in councils, with a 
report due to be published at the SOLACE conference in September. There is
clear data/evidence showing significant shortages in Social Work and Social
Care, as well as lack of consistent and clear learning pathways, and a lack of
funding to support practice teachers in SW and degree students.  Therefore a
national approach, which could come from an NSWA, can be viewed as a
positive move. 
6. Amendments to the Public Bodies (Joint Working) (Scotland) Act 2014
Page 193

Page 194

The Minister’s covering letter states: 
“We intend to improve local delivery through reform of integration authorities.
Integration authorities are existing bodies established under the Public Bodies
(Joint Working) (Scotland) Act 2014. Local reform will require some new
provisions in this Bill amending the 2014 Act, as well as the exercise of
existing powers under that Act.” 
Q - What is your view of the proposed amendments to the Public Bodies
(Joint Working) (Scotland) Act 2014, as set out in the marked up version
of the Act? 
As mentioned above, it is our view that many of the outcomes sought could be
achieved by amending/reviewing the 2014 Act alone, or by reviewing the
current provision of services, as opposed to the creation of a new National
Care Service.  There are a number of improvements that can be achieved
without structural change and funding for the NCS would be better directed to
those service areas. 
In order to promote consistency across the country, the Stage 2 amendments
propose to remove the alternative (lead agency) integration model. Another
means by which to promote consistency could have been to review what
functions may and must be delegated under the 2014 Act regime. As per our
previous response whilst the Bill was at Stage 1, we feel that the desired
outcomes could be achieved more proportionately by review of the 2014 Act
alone, as opposed to the creation of a brand new statutory scheme. 
7. Areas of further work 
The Minister’s covering letter states: 
“There remain a small number of areas where further work is needed to
confirm which legislative approach would best deliver the intended changes
and strengthen their future practical implementation. Those areas are: 
• Direct funding
• Inclusion of children’s services
• Inclusion of Justice Social Work
• Anne’s Law 
“The intention of this approach is to free up COSLA and local government
colleagues from further negotiation on these issues and allow them to focus
specifically on the mission to reduce Delayed Discharges in the coming weeks
and months.” 
Q - What is your view of the Scottish Government’s proposed approach
to addressing the areas of further work outlined in the Minister’s
covering letter? 
Page 194

Page 195

The areas of further work are material considerations under this Bill which
could have significant impacts on local authorities, health boards, service-
users and other relevant parties. As the further work is undertaken, we would
suggest that clear communication and information sharing from the Scottish
Government to those partners is key. We note that this has been lacking up
until now despite the efforts of COSLA to engage with the Scottish
Government on behalf of local authorities. 
COSLA have undertaken extensive discussions and negotiations with the
Scottish Government concerning a number of ongoing challenges and risks in
respect of the NCS. There is growing disappointment from COSLA that these
negotiations have not resulted in positive outcomes, with a number of matters
remaining unresolved, including fundamental disagreement on the areas
detailed above (with the exception of Anne’s Law) . 
8. Draft National Care Service Charter 
As part of the package shared with the Committee, the Scottish Government
has provided an update on co-design of the NCS Charter and an initial draft of
the National Care Service Charter. 
Q - What is your view of the initial draft of the National Care Service
Charter? 
The current draft of the Charter appears to be an easy to read/use document
for service users and all other relevant parties, which clearly sets out their
rights; and the duties/roles of those who provide social work, social care, and
support. It is noted that the draft is to be further developed with important
details to be added. 
In line with comments made at stage 1, the creation of such a charter does
not require wholesale structural upheaval and could be established under the
existing operational arrangements. 
9. Do you have any other comments on the Scottish Government’s
proposed draft Stage 2 amendments to the National Care Service Bill?
Argyll and Bute Council is the second largest local authority area in Scotland,
with the highest number of inhabited islands (23) and 43% of the population
living in remote and rural areas (NOMIS). 
Argyll and Bute Integrated Joint Board/Health and Social Care Partnership
manages the full range of delegated services – Adult Social Work and Social
Care; Children, Family and Justice Services; Acute NHS services and
Hospitals; Primary Care and Community Health Services. Whilst the HSCP
has NHS Highland as one of its partner bodies, all care pathways are to
Greater Glasgow and Clyde. 
This gives Argyll and Bute a particular and unique set of challenges in
delivering care, which is currently delivered by a fully integrated workforce,
and a strategic leadership with links into both the Council and NHS
Page 195

Page 196

Highland.  In Argyll and Bute, integration is enabling community based,
locality designed partnership approaches to delivering care.
We are proud of our staff and our track record of managing care services
across our complex area, particularly in our partnership response to Covid-19,
where our staff and colleagues went the extra mile to keep our communities
safe. 
We recognise the ambition in the NCS Bill to improve care services in
Scotland and fully support that principle. However, we do not see the clear,
evidence based argument that major structural change will result in that
improvement. Investment in the current system of care, with locally based
design and additional powers, such as IJBs becoming employers, could
deliver those improvements, whilst retaining local accountability, locally based
solutions, and building upon the local successes (as outlined above).  
Furthermore we remain concerned about the cost of services, the loss of local
democracy, and running counter to the Verity House Agreement.
In regard to funding and future service costs, both in terms of new investment
in social care services, these have fallen behind the levels of need in terms of
demography and care complexity in Argyll and Bute, and there are potential
impacts on other Council services. These issue are particularly acute in Argyll
and Bute given:
a) the complications of delivering care and support services across such a
diverse range of small urban, rural and island communities; and
b) the demography of Argyll and Bute, where we are experiencing a
significant increase in demand for services from an aging population
whilst seeing a significant reduction in the working age population
available to work in the sector and support the expanding older
generation of service users. Both of these factors are driving up costs
and the need for additional funding. They also require significant local
flexibility to design and tailor services to meet local needs within the
local workforce and financial context – this would seem to be at odds
with the underlying tone of the legislation and the push to a more
centrally controlled “consistent” national model.
With regard to the impact on other Council services, there is both an element
of joint service provision funding which could be lost (eg Children and
Families and Education co-fund specialist care placements for young people
from the area) and the SW GAE’s contribution to the overall funding of the
Council (eg support services are funded and optimised to meet the needs of
the Council as a whole from all GAE sources) at stake. 
Page 196

Page 197

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH                    15 AUGUST 2024 
REDIRECTION OF CROWN ESTATES FUNDING 
1.0 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to gain approval to redirect Crown Estates
Funding (CEF), previously approved for solar powered CCTV on the island
airports of Coll and Colonsay, towards the purchase of a new fire appliance
vehicle.  This vehicle will replace a current vehicle considered to be no longer
fit for purpose and be used as back up to the island airports when routine/or
unplanned maintenance to the island fire appliances takes place.
1.2 Anticipated estimate cost for the new vehicle is approximately £60k, with an
option to lease for £1,500 pcm. 
RECOMMENDATIONS 
It is recommended that Policy and Resources Committee agree to redirect the
Crown Estates Funding (CEF), previously awarded for the provision of solar
powered CCTV at the island airports of Coll and Colonsay, towards the
provision of a backup fire appliance vehicle, to meet Civil Aviation Regulations in
the provision of fire cover at island licensed airports. 
Page 197 Agenda Item 8

Page 198

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH                      15 AUGUST 2024 
REDIRECTION OF CROWN ESTATES FUNDING 
2.0 INTRODUCTION 
2.1 Crown Estates Funding – Redirection of Funding
Previous agreed awards to the Airports, from the Crown Estates Funding
(CEF), for new infrastructure are as follows: -
i). £100k – This was for fire training simulator rigs on each of the islands of
Coll and Colonsay. A contract has been awarded to Minerva, at a cost of
£53,700. The rest of the original allocation was to implement solar
powered CCTV on each of the islands. A tender was put out for this,
however had to be abandoned due to security concerns. 
ii). £120k – Latest allocation from CEF, for connection by Scottish and
Southern Electricity Networks (SSEN), to connect Colonsay airport to the
power grid. This is in hand, with Property Services pursuing SSEN on
delivery. (Colonsay airport is currently powered by a generator).   
3.0 RECOMMENDATIONS 
3.1 It is recommended that Policy and Resources Committee agree to redirect the
Crown Estates Funding (CEF), previously awarded for the provision of solar
powered CCTV at the island airports of Coll and Colonsay, towards the
provision of a backup fire appliance vehicle, to meet Civil Aviation Regulations in
the provision of fire cover at island licensed airports. 
4.0 DETAIL 
4.1  Abandonment of solar powered CCTV tender  
4.1.1  The Council abandoned the tender for the above, due to current conflict with
some of the products currently marketed, and national guidance in their use at
sensitive sites. 
Page 198

Page 199

4.2 Fire Appliance Vehicles 
4.2.1 Argyll and Bute Council currently have two fire appliance vehicles located at
Oban airport. The Oban vehicles are equipped to provide a higher level of fire
cover due to the equipment and media it carries, allowing Oban to handle larger
aircraft due to longer runway (1200m), which the island vehicles cannot. (Island
runways of Coll and Colonsay airports are 500m in length, by comparison). 
4.2.2 The second vehicle at Oban serves purely as a spare vehicle in case the main
vehicle requires maintenance or develops a fault. The second vehicle at Oban,
also enables the airport to conduct fire training during operational hours. 
4.2.3  There is also one fire vehicle on each of the islands, to provide fire cover at Coll
and Colonsay airport. These vehicles are required to meet Civil Aviation
Authority regulations regarding provision of fire cover, at each of the Council’s
licensed airports. 
4.2.4  Argyll and Bute Council did have a fifth fire appliance vehicle, which was an
original fire appliance vehicle that was retained from the islands, when the
Council replaced the vehicles on each island with newer models. The
requirement for this fifth appliance is twofold: - 
• It provides replacement fire cover for routine maintenance of the islands
vehicles when they have to come back to the workshop on the mainland.
• It provides replacement fire cover for all airports should any of the fire
appliance vehicles have an unanticipated break down. 
4.2.5  Ideally, the fifth appliance would be the same type of vehicle the island airport
staff already have, as this would mean the crews would be familiar with it and all
the equipment would be transferable. 
4.2.6  The existing fifth fire appliance vehicle has now met its life expectancy, (to put
into context this vehicle was first registered in 1999) and is no longer fit for
purpose, with the Councils workshop advising it can no longer get parts to keep
the vehicle operational. 
4.2.7  It is therefore considered prudent to redirect the remaining CEF allocation of
£46,300 (from original £100k allocation) towards the purchase of a new back up
fire appliance vehicle. Anticipated estimates for the new vehicle are
approximately £60k, with an option to rent for £1500 pcm. Any additional costs
above the £46,300 would be met by the revenue airport maintenance budget. 
4.2.8  Having a spare vehicle for the islands would provide back up in the event of a
breakdown, allowing the Public Service Obligation (PSO) air services to
continue operating from Oban to the islands of Coll, Colonsay and Tiree. A
suitable fire appliance vehicle is required, under Civil Aviation Authority
Page 199

Page 200

Regulations, to meet the necessary fire cover provision at each of the licensed
airports, for the landing and take-off, of the scheduled air services. 
4.2.9  It is considered that the need for a replacement backup fire engine is now a
priority, and that solar powered CCTV can be pursued through available funding
streams at a later date.  In particular, once there is further clarity on national
guidance as to appropriate products available on the market.   
5.0 CONCLUSION 
5.1 The main purpose of this report is to gain approval to redirect Crown Estates
Funding (CEF), previously approved for solar powered CCTV on the island
airports of Coll and Colonsay, towards the purchase of a new fire appliance
vehicle for back up to the island airports, for routine maintenance to the island
fire appliances and also as back up for any unplanned vehicle repairs. 
5.2 Anticipated estimates for the new vehicle are approximately £60k, with an option
to rent for £1,500 pcm. 
5.3 It is therefore recommended to redirect the CEF, previously awarded for the
provision of solar powered CCTV at the island airports of Coll and Colonsay
towards the provision of a back-up fire appliance vehicle to meet Civil Aviation
Regulations in the provision of fire cover at island airports. This is now
considered a higher priority than the provision of solar lighting. 
6.0 IMPLICATIONS 
6.1 Policy – Argyll and Bute Council provide PSO air services to the fragile 
Island communities of Coll, Colonsay and Tiree. 
6.2 Financial – Anticipated estimates for the new fire appliance vehicle are
approximately £60k, with an option to rent for £1,500 pcm. The report
recommends a redirection of Crown Estates Funding and use of existing
budget to meet the costs of the new appliance. 
6.3  Legal – Tenders for any new fire appliance vehicles will require to be
compliant with Procurement Scotland legislation. 
6.4  HR – None. 
6.5  Fairer Scotland Duty: 
6.5.1  Equalities - Air services provide connections to rural island
communities primarily for scholars but are also used by public and
private sector services e.g. NHS, ABC, and Housing Associations
Page 200

Page 201

6.5.2  Socio-economic Duty - The air service supports an equitable standard
of living for island residents. 
6.5.3  Islands - The air service supports vulnerable island populations and is a
lifeline service. There is a chance that if this service isn't provided,
people won't want to live or work there as much, which could affect the
SOA's goal of population growth.
6.6 Climate Change – Multiple passengers on a one-hour flight may have less of
an environmental impact than those travelling by vehicle and ferry for six hour.
6.7 Risk – Risk of break in air services as a result of not meeting Civil Aviation
Authority legislation in relation to fire cover at licensed airports. 
6.8  Customer Service – None. 
6.9 The Rights of the Child (UNCRC) – None. 
Kirsty Flanagan, Executive Director with responsibility for Development and  
Economic Growth
Councillor Jim Lynch, Leader of Argyll and Bute Council 
July 2024                                                 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Moya Ingram, Strategic Transportation and Infrastructure Manager
moya.ingram@argyll-bute.gov.uk 
Page 201

Page 202

This page is intentionally left blank

Page 203

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND 
ECONOMIC GROWTH  
15th AUGUST 2024 
UPDATE: ARGYLL AND BUTE UK SHARED PROSPERITY FUND
INVESTMENT PLAN INTERVENTIONS   
1.0 HEADLINES 
1.1 The purpose of this paper is to provide an update for members of the committee on the
progress of the Argyll and Bute UK Shared Prosperity Fund (UKSPF) Investment Plan
project / programme interventions that are being delivered across Argyll and Bute. 
1.2 As the UKSPF is a successor to the previous EU structural funds. The overarching aim
of this funding is to build pride in place and increase life chances across the UK. 
1.3 As summarised in Table A1, Appendix A the project / programme activities outlined in
the Argyll and Bute UKSPF Investment Plan are all aligned to three key investment
priorities communities and place; supporting local business; and people and skills,
where each priority has predefined interventions, outputs and outcomes. In addition to
core UKSPF monies, the investment plan includes a focus on ring-fenced ‘Multiply’
funding to support the delivery of an area-based adult numeracy programme. The
substantive element of this funding is being delivered by UHI Argyll further to a
competitive procurement process. 
1.4 The Argyll and Bute Council UKSPF allocations to support delivery over three financial
years, specifically the final five months of 2022/23 and the next two financial years,
2023/24 and 2024/25, until the end of March 2025 are outlined in Table 1. At the
outset it was advised that allocations should be spent in year. However, given that the
2022/23 allocation was not approved until December 2022, funding was carried over
from 2022/23 into 2023/24 and likewise into the final year 2024/25. 
1.5 As noted in Table 1 the largest allocation of UKSPF budget is in the final financial year
2024/25 which is challenging. Through discussions at the Scottish Local Authorities
Economic Development (SLAED) Executive and Funding Group meetings, a request
was sought in writing to key ministers within the previous UK Government in April 2024
to extend the UKSPF delivery timescales by one-year, complete with capacity funding
to cover staffing costs, to enable all projects to complete spend and deliver, given the
significant delay to approving the year one allocation. The response noted that this
would be considered in the autumn spending review.  However, given the new UK
Government, such a request will need to be resubmitted to address this continued
uncertainty. 
Page 203 Agenda Item 9

Page 204

2.0 RECOMMENDATIONS 
2.1 Members are asked to: 
• Note the content of this report and progress made. 
• Agree officers engage with the UK Government on the requirement for some
clarity on future funding streams, such as the UK Shared Prosperity Fund, in light
of the recent change of the UK Government. 
3.0 DETAIL 
3.1 On 13th April 2022 the UK Government published the full prospectus of the UKSPF, a
successor to the previous EU structural funds. The overarching aim of the UKSPF is to
build pride in place and increase life chances across the UK. This encompasses four
levelling up objectives and three investment priorities. 
The levelling up objectives are:
• Boost productivity, pay, jobs and living standards by growing the private
sector, especially in those places where they are lagging;
• Spread opportunities and improve public services, especially in those places
where they are weakest;
• Restore a sense of community, local pride and belonging, especially in those
places where they have been lost; and
• Empower local leaders and communities, especially in those places lacking
local agency. 
The Investment Priorities are:
• Communities and place;
• Supporting local business; and
• People and skills. 
The interventions list for Scotland as a whole can be found here and the objectives,
outcomes and outputs can be found here. 
3.2 Immediately following the General Election results of 4th July 2024, the new UK
Government signalled a move away from the use of the term ‘levelling up’ in ministerial
statements, with the phrase ‘local government’ replacing the term in departmental and
ministerial titles. At present, it is unclear what this may mean for any successor to the
UKSPF as there has not yet been formal policy announcements, although it is thought
that the broad priorities above will remain important. 
3.3 A summary of the Argyll and Bute allocation (which includes a 4% administration fee
for overall fund delivery) and current spend is outlined in Table 1 overleaf. The
percentages of the allocation by year are given, showing the largest allocation for core
UKSPF in 2024/25. It is a concern that the allocation for Multiply is 30.2% for 2022/23
did not take into account the shorter timescale for delivery. A delayed start to the
programme in 2022/23 resulted in an underspend which has been carried forward into
Page 204

Page 205

the current year, with a knock-on effect for 2023/24. The UK Government has
permitted re-allocation of funds across activities within core UKSPF spend in 2022/23
but not in later years. 
3.4 Table 1 below shows the spend to date. Six-monthly reporting to UK Government on
spend for this current financial year is due in September, when an update forecast can
be given. Re-allocation of spend across years and projects has allowed us to maximise
delivery, and we will continue to work closely with delivery partners to do so where
possible throughout the remainder of the project. However, it will remain challenging to
deliver the entire allocation without an extension beyond of the end 2024/25 FY to
allow projects to complete and spend. 
Table 1 - UK Shared Prosperity Fund Allocations and Spend 2022/23 – 2024/25
Core 2022/23 2023/24 2024/25 Total
In-year allocations Core
UKSPF
12% 24% 64% 100%
£451,343 £902,686 £2,365,038 £3,719,067
Revised Forecast Spend
(including previous year
underspend)
- £1,323,641 £2,620,394 -
Spend £30,387 £1,068,285 - £1,098,672
Balance £420,955 £255,356 £2,620,394 £2,620,394
Multiply* 2022/23 2023/24 2024/25 Total
In-year allocations
Multiply
30% 35% 35% 100%
£234,698 £270,806 £270,806 £776,310
Spend £4,793.80 £218,497.75  
Underspend £229,904.20 £52,308.25  
* Multiply is an adult numeracy programme, which will support people with no or low-level maths skills
get back into work The scheme will offer free personal tutoring, digital training, and flexible courses to
improve adults’ confidence and numeracy skills. Full details on Multiply can be found here . As noted in
the text underspend in 2022/23 was carried over into core UKSPF activity in 2023/24 however, UK
government have confirmed this is not allowable for future years. 
N.B. Figures subject to rounding. 
3.5 A summary of projects under each of the three priorities, and spend to date is given in
Table A1, Appendix A. Significant activity has been delivered against the three
investment priorities as depicted in Table A1. Selected highlights are as follows. 
• Argyll and Bute Revenue and Benefits team, as part of their work under the
Communities and Place priority, have reached 581 people, supporting 268
households to reduce the cost of living, including through measures to improve
energy efficiency, and combat fuel poverty and climate change. 
• The Council’s Employability team offers UKSPF Training and Work Placements.
Since May 2023, they have helped 45 participants undertake a wide range of
training courses to provide valuable workforce skills. The UKSPF-Supported
Work Placement programme proved very successful, with 13 participants since
May 2023 continuing with their Work Placement host after the end of the
placement. 
Page 205

Page 206

• Within Supporting Local Businesses, delivery partners Argyll and Bute Business
Gateway had delivered 43 grants by the end of March 2024 to enterprises in the
local authority and assisted five entrepreneurs to be business ready. Some
testimonials (approved to share by the business) from the Business Gateway
support are outlined below: 
Dace McLellan, Rolling Pizza - mid Argyll – UKSPF Business Start-up Grant
recipient (originally posted on LinkedIn) 
Dace approached Business Gateway last year when the idea for the
business first began. Dace converted an old horse box into a van with a
wood-fired oven allowing her to cook fresh pizzas made to order from
any location. With support and guidance from her local Business
Gateway Adviser, Donald Melville, she accessed start-up funding through
the UK Shared Prosperity Fund which helped with the initial set-up costs. 
Dace noted “Business Gateway was a huge support to me when setting
up Rolling Pizza and has continued to be now we’re up and running. The
online system has been great for encouraging people to pre-order and
gives me an indication of potential earnings and I couldn’t have done that
without Business Gateway. Being in a rural area can often make it more
difficult to find business support, but Donald has been a fantastic help
and I really appreciate his guidance.” 
• Delivery partners InspirAlba has supported the People and Skills priority by
retraining 23 individuals in the local authority with 18 being supported to gain a
qualification or complete a course. 
• Third Sector Interface (TSI) has supported 52 volunteering opportunities. 
4.0 CONCLUSION 
4.1 The purpose of this paper is to provide an update for members of the committee on the
progress of the Argyll and Bute UK Shared Prosperity Fund (UKSPF) Investment Plan
project / programme interventions that are being delivered across Argyll and Bute. 
4.2 As noted above, spend is progressing, but it is challenging that most of the spend is
allocated into this financial year, 2024/25. This is exacerbated by knock-on effects from
a late start to the UKSPF resulting in further activity and spend being rolled over into
the final year of the programme. Clarity is required urgently whether the new UK
Government will grant a one-year extension to allow all projects and programmes to
complete delivery and spend, complete with additional capacity funding to support
staffing costs. 
Page 206

Page 207

5.0 IMPLICATIONS 
5.1  Policy: this project / programme interventions aligns with the proposals set the UKSPF
full prospectus. 
5.2  Financial: Argyll and Bute Council has been given an allocation of just under £4.5m
from the UKSPF to be spent by the end of March 2025. This is accompanied by £20k
of capacity funding to assist in the development and preparation of the investment plan
and the ability to use up to 4% of the allocation per annum to fund administration
support for the overall delivery of the Argyll and Bute UKSPF Investment Plan. 
5.3  Legal: all appropriate legal implications will be taken into consideration. 
5.4  HR: given the revenue nature of this fund, staffing requirements can be built in under
activity to deliver the predefined interventions, outputs and outcomes. The UK and
External Policy Team, Economic Growth, is supporting the requirement to administer,
monitor and evaluate the overall delivery of the Argyll and Bute UKSPF Investment
Plan. 
5.5  Fairer Scotland Duty:  the Fairer Scotland Duty, Part 1 of the Equality Act 2010, came
into force in April 2018. The duty places a legal responsibility on particular public
bodies in Scotland, such as Argyll and Bute Council, to pay due regard to (actively
consider) how they can reduce inequalities of outcome caused by socio-economic
disadvantage when making strategic decisions and how this has been implemented. 
5.5.1 Equalities: all activities will comply with all Equal Opportunities/Fairer Scotland Duty
policies and obligations.
5.5.2 Socio-economic Duty: all project / programme activities will comply with the council’s
socio-economic duty.
5.5.3 Islands: interventions under the UKSPF will be delivered across the Argyll and Bute
area, including island communities. 
5.6  Climate Change: there are a number of net zero and climate resilience interventions
across all the UKSPF investment priorities. 
5.7  Risk: to ensure all projects and programmes can conclude with no money returned to
the UK Government, clarity is required whether the new UK Government will grant a
one-year extension to allow all projects and programmes to complete delivery and
spend, complete with additional capacity funding to support staffing costs. 
5.8  Customer Service: none.   
5.9 The Rights of the Child (UNCRC): none. 
Kirsty Flanagan, Executive Director responsible for Economic Growth 
Councillor Math Campbell-Sturgess: Policy Lead for Business Development 
Page 207

Page 208

1st August 2024 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
fergus.murray@argyll-bute.gov.uk 
Ishabel Bremner, Economic Growth Manager 
ishabel.bremner@argyll-bute.gov.uk 
Kevin Grant, Senior Development Officer, UK & External Policy Team, Economic Growth
kevin.grant@argyll-bute.gov.uk 
APPENDICES 
Appendix A: Summary of Argyll and Bute UKSPF Investment Plan Projects / Programmes 
Page 208

Page 209

Appendix A: Summary of Argyll and Bute UKSPF Investment Plan Projects /
Programmes 
Table A1: Summary of Argyll and Bute UKSPF Investment Plan Projects /Programmes
Communities and Place
Predefined Intervention Project Allocation 
(exc. admin)
Spend to 31st 
March 2024
S7: Funding for the development and
promotion of wider campaigns which
encourage people to visit and explore local
areas.
Tourism
Marketing
Support £155,000 £78,047
S8: Funding for impactful volunteering
and/or social action projects to develop
social and human capital in local places.
Community
Planning
Partnership
Climate Change
Working Group –
community
capacity building
£60,000 £11,294
S9: Investment in capacity building,
resilience (including climate change
resilience) and infrastructure support for
local civil society and community groups.
Extension of
Shaping Places
for Wellbeing
Support
£6,000 £224
Vibrant and Living
Spaces £304,262 £0
S10: Community measures to reduce the
cost of living, including through measures
to improve energy efficiency, and combat
fuel poverty and climate change.
Extension of
Flexible Food
Fund - grants,
advice and skills
support for
people struggling
with cost of living
£408,000 £225,865
S12: Investment and support for digital
infrastructure for local community facilities. Community Hubs £81,750 £1,577
S13: Support for linking communities
together and with employment
opportunities with a focus on
decarbonisation.
Pre-loved School
Uniform Project £140,000 £0
Sub-total allocation for Communities and Place £1,155,012 £317,008 
Page 209

Page 210

Supporting Local Businesses
Predefined Intervention Project Allocation 
(exc. admin)
Spend to 31st
March 2024
S14: Funding for the development and
promotion (both trade and consumer) of
the visitor economy, such as local
attractions, trails, tours and tourism
products more generally.
Tourism Sector
Support –
improved digital
infrastructure for
data monitoring,
evaluation & visitor
book ability
£45,000 £21,463
S15: SME development grants and
support, aligned with local and regional
sectoral priorities and growth potential.
The support is proven to leverage high
levels of private investment into
technologies that drive growth,
productivity, efficiency and resilience in
manufacturing.
Scientific Robotics
Academy £299,900 £77,380
S16: Research and development grants
supporting the development of innovative
products and services, with a particular
focus on low carbon goods and
environmental services, and climate
resilience. 
Innovation Support
Service providing
expert advice and
capability reviews
to help SMEs
create innovation
plans
£100,000 £1,600
S22: Support for growing the local social
economy, including community
businesses, cooperatives and social
enterprises.
Graduate
Apprenticeship
Opportunities in
the Third Sector
£71,154 £35,003
S26: Business support measures to drive
employment growth, particularly in areas
of higher unemployment.
Graduate
Placement
Programme
providing graduate
placement grants
covering staff,
training and travel
costs
£180,000 £33,154
S29: Support for new and existing
businesses and start-ups aligned with
local, regional and Scottish policy.
Business
Development
Package for local
SMEs, providing
enhanced start-up,
recovery and
growth support
comprising grants,
specialist advice
and intensive
support
programmes
£454,099 £105,276
Sub-total allocation for Supporting Local Businesses £1,150,153 £273,876 
Page 210

Page 211

People and Skills
Predefined Intervention Project Allocation
(exc. admin)
Spend to 31st
March 2024
S31: Employment support for
economically inactive people:
intensive support supplemented by
additional and/or specialist life and
basic skills (digital, English, maths
(Multiply) and ESOL) support where
there are local provision gaps.
Adult Literacy and
Numeracy Programme £165,559 £22,336
S33: Activities such as enrichment
and volunteering to improve
opportunities and promote wellbeing
Expansion of the Wider
Achievement
Programme for all
secondary schools
£125,000 £5,204
Pre-Employability
Support Programme
Work Placements
£402,489  £120,779
Positive Destinations
Programme, providing
support for young
people
£137,475 £123,175
S35: Support for employability
programmes and advice including
alignment with the No One Left Behind
agenda, Fair Start Scotland and
Scottish employability pipeline. This
could include tailored support to
address barriers to accessing
education and training courses.
Pre-Employability
Support Programme
Training
£97,765 £19,430
Supported Employment
Experience in the Third
Sector
£336,850 £166,162
Sub-total allocation for People and Skills £1,265,138 £457,086
Overall Allocation (exc. admin) £3,570,303 £1,047,970 
The above projects/programmes have been implemented using a mixture of delivery models (again
predefined by the UK Government) as follows:
• In-house provision;
• Procurement of service provision;
• Grants to public or private organisations; or
• Commissioning third party organisations. 
Page 211

Page 212

This page is intentionally left blank

Page 213

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
15 AUGUST 2024 
SCOTTISH GOVERNMENT ISLANDS PROGRAMME AND CARBON NEUTRAL
ISLANDS CAPITAL FUNDING 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to provide information on the Scottish
Government’s Island Programme and Carbon Neutral Island Capital Fund. On
5 June 2024, the Scottish Government announced that £3m would be available
through the Islands Programme for the 2024/25 financial year to fund capital
projects on inhabited Scottish islands. A further £1m is available through the
Carbon Neutral Islands Capital Fund which is available for suitable capital
projects on Islay. The funds will be distributed on a competitive basis and this
paper provides background to the funds and sets down the proposed projects
which will form the basis of our applications to the Scottish Government. 
1.2 The timescale for applying for this funding requires applications to be submitted
by 30 August 2024 with a decision expected during autumn 2024. Grant
drawdown must be completed by 31 March 2025.
1.3 Teams across the Council and Health and Social Care Partnership have
identified potential projects for the Islands Programme which have been
considered against the criteria and scoring for the fund. A similar process has
taken place with Islay Energy Trust, as the key local stakeholder involved in
delivery on the Islay Climate Change Action Plan. Given the need to submit
applications by the 30 August 2024 deadline, work is underway in relation to the
following projects which were deemed to fit most closely with the fund
requirements. 
Islands Programme (IP)
Project Name - description Project Lead IP funding
request
Total
project
value
Thomson Court – increase
capacity of care facility by 2 bed
spaces 
HSCP £300,000-
£400,000
£500,000
Page 213 Agenda Item 10

Page 214

Jura Ferry – concept design for
new vessel
Roads and
Infrastructure
Services
£200,000 £200,000
Jura Ferry Bunkhouse –
conversion of Port Askaig pier
building into crew bunk house  
Roads and
Infrastructure
Services
£200,000 £200,000 
Carbon Neutral Islands (CNI) Capital Fund
Project Name - description Project Lead CNI
funding
request
Total
project
value
Solar Islay – a project to install
photovoltaic solar panels on
community buildings 
IET TBC TBC
Cornabus Forest Development –
purchase of equipment to facilitate
management and harvest
Islay
Development
Initiative
TBC TBC
Electric minibuses – purchase of
electric vehicles to facilitate
community transport
TBC TBC TBC
Cornabus Orchard – the
establishment of an orchard 
Islay
Development
Initiative
TBC TBC 
1.4 Members are asked to note that this is a competitive bidding process open to all
Scottish local authorities with inhabited islands and it is considered likely that the
fund will be oversubscribed.  As such, it is important that projects are sufficiently
developed to enable the best chance of success and to ensure that if successful
the funding can be fully accessed for the benefit of these island communities. 
RECOMMENDATIONS 
It is recommended that the Policy and Resources Committee:-
i). Note the process for applying to the Islands Programme and Carbon
Neutral Islands Capital fund and the 30 August 2024 deadline for
applications. 
ii). Approve the recommended projects which will be submitted to the call for
applications as detailed at paragraph 4.7 and 4.10. 
iii). Agree to delegate authority to the Executive Director with responsibility
for Development and Economic Growth in consultation with the Leader,
Depute Leaders and the Leader of the largest Opposition Group, to
approve the funding bids prior to submission to the Scottish Government
and to manage the funding should the applications be successful. 
Page 214

Page 215

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
15 AUGUST 2024 
SCOTTISH GOVERNMENT ISLANDS PROGRAMME AND CARBON NEUTRAL
ISLANDS CAPITAL FUNDING 
2.0 INTRODUCTION 
2.1 On 5 June 2024, the Scottish Government announced that Islands Programme
funding of £3m would be available for the 2024/25 financial year to fund capital
projects on inhabited Scottish islands. The fund is open to all local authorities in
Scotland with inhabited islands and will be distributed on a competitive basis.
The fund will be administered by Scottish Futures Trust (SFT) on behalf of the
Scottish Government. They also announced a £1m fund to support the Carbon
Neutral Islands in their progression towards net zero. This fund is open only to
islands selected as Carbon Neutral Islands, Islay for Argyll and Bute, for capital
works to support their Climate Change Action Plan. This paper provides
background to the funds and sets down the proposed projects which will form
the basis of our applications to the Scottish Government. 
3.0 RECOMMENDATIONS 
It is recommended that the Policy and Resources Committee:- 
i). Note the process for applying to the Islands Programme and Carbon
Neutral Islands Capital Fund and the 30 August 2024 deadline for
applications. 
ii). Approve the recommended projects which will be submitted to the call for
applications as detailed at paragraph 4.7 and 4.10. 
iii). Agree to delegate authority to the Executive Director with responsibility
for Development and Economic Growth in consultation with the Leader,
Depute Leaders and the Leader of the largest Opposition Group, to
approve the funding bids prior to submission to the Scottish Government
and to manage the funding should the applications be successful. 
Page 215

Page 216

4.0 DETAIL 
Islands Programme
4.1 The key objectives of the Islands Programme for 2024/25 are:
• To sustain, enhance and develop transformational and critical infrastructure
projects based on local priorities whilst supporting the National Islands Plan.
• To reshape infrastructure by supporting shovel worthy projects, co-ordinating
with other funded and planned initiatives on the islands to drive sustainable
island growth.
• To support projects which use clear Place based, Community Wealth
principles to support inclusive island growth and reduce poverty while
working to achieve the Scottish Government’s Net Zero Ambitions and a Just
Transition.
• To maximise leverage of partnership, investment, and cross policy funding.
4.2 The Council has been successful in securing £1.5m of Islands Programme
funding over the last two financial years which has helped to deliver flood
protection, digital infrastructure, care facilities and housing enabling
infrastructure on the islands of Mull, Iona, Islay, Tiree and Coll. The 2024/25
funding pot is £3m, significantly less than in previous years - £4.5 million in
2022/23 and £4.1 million in £2023/24 - with an indication that this may be further
reduced due to the Scottish Government’s financial position going forward.
4.3 In notifying the Council of the opening of the Islands Programme for 2024/25,
the Scottish Government advised of the following timescale for submission and
determination of applications:
• Applications deadline – 30 August 2024
• Investment Panel recommendations – Mid September 2024
• Projects for 2024/25 funding announced – Autumn 2024
• Grant drawdown / project delivery - to 31 March 2025, with preference for
those where a financial commitment can be made before 31 December
2024. 
It should be noted that the timescale for submission and drawdown of this fund
is significantly shorter than in previous years and this has informed the process
for identifying projects that are sufficiently developed to be eligible for this year’s
programme, there is no facility for funding to be carried forward into 2025/26.
4.4 Officers from the Transformation Projects and Regeneration Team have
contacted Piers and Harbours, Infrastructure Design, Commercial Services,
Strategic Transportation and the Health and Social Care Partnership to identify
potential projects to form the basis of applications. Due to the short timescale for
submission of applications, the fact the application period  falls over the summer
holiday period, the limited pot of funding available and subsidy control
regulations we have focused on Council and other public sector projects which
we believe can meet the timescales. 
Page 216

Page 217

4.5 All suggested projects were considered against the advised scoring
methodology for the fund
• Deliverability (30%)
o Demonstrating Deliverability
o Viability
• Need and Partnership (35%)
• Project Outcomes (35%) 
SFT have emphasised there is a particular importance on deliverability and that
this is a primary consideration for assessment as there is no ability for funding to
be carried forward into the next financial year. Projects must be able to
demonstrate that a financial commitment (i.e. have spent the money or have a
signed contract) will be in place before 31 March 2025. Guidance from SFT
highlights that any projects likely to reach the stage of a financial commitment
after 31 December 2024 would likely not be prioritised for funding. This is a
challenging timescale given the need to follow public procurement regulations,
confirm any match funding and obtain any consents that may be necessary
before contracts can be signed.
4.6 Following identification of a range of projects these were discussed with SFT
and their early opinions on which fit most closely with the requirements of the
fund were sought. During these discussions they highlighted a particular desire
to utilise the 2024/25 funding to focus on improving living standards, reducing
poverty and strengthening wellbeing. On this basis, the Bute project listed below
were well received as Rothesay is considered to be an area of multiple
deprivation evidenced by Scottish Index of Multiple Deprivation (SIMD). The
SIMD shows Rothesay town centre being within the 10% most overall deprived
datazones in Scotland. They were also keen to see projects which supported
islands which have not previously received Islands Programme funding and
neither Bute nor Jura have benefited to date. 
4.7 Giving consideration to the guidance provided by SFT, it is recommended that
the following projects are submitted as applications and, due to the timescales
for submission of applications, work is already underway in preparing these
applications for submission before the deadline of 30 August 2024.
Project Name - description Project Lead IP funding
request
Total
project
value
Thomson Court – increase
capacity of care facility by 2 bed
spaces 
HSCP £300,000 £500,000
Jura Ferry – concept design for
new vessel
Roads and
Infrastructure
Services
£200,000 £200,000
Jura Ferry Bunkhouse –
conversion of Port Askaig pier
building into crew bunk house  
Roads and
Infrastructure
Services
£200,000 £200,000
Page 217

Page 218

Carbon Neutral Islands Capital Fund
4.8 In addition to the Islands Programme, the Scottish Government is also making
£1m of funding available to support the Carbon Neutral Islands (CNI) in their
progression towards becoming net zero. The CNI project is a Scottish
Government commitment aimed at supporting six islands to become carbon
neutral by 2040. The identified island within Argyll and Bute is Islay and
following selection the CNI team have been working with the local community to
develop a Climate Change Action Plan. Islay Energy Trust (IET) has led this
work on Islay and have been instrumental in preparing and now starting to
implement the Action Plan.
4.9 We have been working with IET, who in turn have been working with other Islay
based organisations, to identify potential projects which would meet the
requirements of the fund. The timescale for application, decision and
expenditure mirror those of the Islands Programme with a focus that outputs and
outcomes should also contribute to the Climate Change Action Plan. For the
CNI Capital Fund there is a minimum project value of £75,000.
4.10 At the time of writing we are seeking a meeting with SFT to discuss the
applications, however at this stage it is recommended that the following projects
are submitted as applications and, due to the timescales for submission of
applications, work is already underway in preparing these applications for
submission before the deadline of 30 August 2024.
Project Name - description Project Lead CNI
funding
request
Total
project
value
Solar Islay – a project to install
photovoltaic solar panels on
community buildings 
IET TBC TBC
Cornabus Forest Development –
purchase of equipment to facilitate
management and harvest
Islay
Development
Initiative
TBC TBC
Electric minibuses – purchase of
electric vehicles to facilitate
community transport
TBC TBC TBC
Cornabus Orchard – the
establishment of an orchard 
Islay
Development
Initiative
TBC TBC 
4.11 Members are asked to note that these are competitive bidding processes open
to all Scottish local authorities with inhabited islands and it is considered likely
that the funds will be oversubscribed.  As such, it is important that projects are
sufficiently developed to enable the best chance of success and to ensure that if
successful the funding can be fully accessed for the benefit of these island
communities.
Page 218

Page 219

4.12 Once applications are submitted, the Transformation Projects and Regeneration
Team will continue to liaise with SFT and the identified project lead to deliver
successful projects and fulfil the monitoring and reporting requirements which
will form part of the funding conditions. Project Officers within the project lead
service will be identified to manage the delivery of successful projects and
ensure all funding is drawn down in line with the criteria for the programme. 
5.0 CONCLUSION
5.1 The Islands Programme and Carbon Neutral Islands Capital Fund offers an
important source of funding to support island based infrastructure projects which
can help to sustain and enhance our island communities. Despite the reduced
timescale for applying for funding this financial year, we believe that there are a
number of projects which meet the criteria of the programmes and will support
the delivery of essential infrastructure and sustainability on our island
communities.   
6.0 IMPLICATIONS
6.1 Policy – all applications are required to support the Scottish Government’s
National Islands Plan as well as other relevant national and local policy
documents. CNI applications will also support local Climate Change Action
Plans.
6.2 Financial – if successful, the projects will secure funding from the Scottish
Government however the Thomson Court – HSCP project will also require
match funding, where this is the case and it impacts on the Council this will be
sought through other Council/HSCP approval processes. 
6.3  Legal – the support of legal services will be required in relation to the grant
contract, creation of standard securities and other legal requirements
associated with the funding.
6.4  HR – as an applicant for the grant there is an expectation that the Council
meets the Fair Work First requirements of the Scottish Government. As the
council currently do not meet all requirement, HR is supporting our application
for an exemption. Staff time will be required to prepare the applications,
monitor and report on the applications and deliver the projects.
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – no implications anticipated. 
6.5.2   Socio-economic Duty – the Island Programme projects seek to support
critical island infrastructure for the benefit of the wider community. The
CNI projects seek to support community organisations or generate
community wealth which can then support the local community.
Page 219

Page 220

6.5.3  Islands – all projects are required to be based on an inhabited island to
be able to bid for funding, the limited amount of funding available and
the nature of the fund means that it isn’t possible for all island
communities to benefit from this round of funding.
6.6 Climate Change – The Islands Programme projects will have varying impacts
on climate change but all projects will look to minimise any negative impacts
where possible. The Thompson Court project could help to minimise emission
by enabling relatives to remain close to their families. The Jura Ferry projects
will support a lifeline transport service and should funding be secured for the
ferry replacement enable to provision of a more modern vessel with the
benefits that this brings. All projects put forward for CNI Capital Finding are
focused on supporting the delivery of the Islay Climate Change Action Plan
and making a positive contribution toward the move to net zero. 
6.7 Risk – each project will have its own risks which will be managed by the team
identified as the project lead. At this stage, there is a risk that the funding
applications will not be successful and significant staff resource is required in
developing and submitting applications. Given the time timescale for
expenditure, there is a risk that delays in project delivery could reduce the
funding received.
6.8  Customer Service – no implications anticipated.
6.9 The Rights of the Child (UNCRC) – no implications anticipated. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth
Councillor Jim Lynch, Depute Policy Lead for Economic Development,
Housing, Communities and Islands 
15 July 2024                                                  
For further information contact: 
Fergus Murray, Head of Development and Economic Growth
Fergus.Murray@argyll-bute.gov.uk 
Jonathan Welch, Rural Growth Deal Programme Manager
Jonathan.Welch@argyll-bute.gov.uk  
Page 220

Page 221

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
15 AUGUST 2024 
ISLANDS COST CRISIS EMERGENCY FUND 2024/25 
1.0 EXECUTIVE SUMMARY 
1.1 The Islands Cost Crisis Emergency Fund (ICCEF), which aims to help island
authorities take urgent action to support households through the cost of living
crisis, was set up in December 2022. £1 million funding has been identified for
the 2024/25 financial year.  The funding will be distributed to the six Local
Authorities with responsibility for islands through the 2024/25 Local
Government Revenue Grant. 
1.2 This funding is for 2024/25 financial year only, and will be allocated via a grant
offer across the six local authorities using 100% population basis as
recommended by the joint Scottish Government/COSLA settlement
Distribution Group approved by the COSLA political Leaders. 
1.3 The allocation to Argyll and Bute for 2023/24 was £141,000 and the funds
were distributed as detailed in Table 1 below. The allocation will remain the
same for 2024/25, £141,000. 
1.4 Local authority decisions on where funding will be directed should be based
on their local knowledge and understanding of the impacts of the cost crisis
on their islands. The fund should be used to target island areas only, by
providing immediate help to those who are struggling most, either through
existing schemes and/or other new support where need is greatest.  The
outcomes of this funding are expected to have stronger focus on child
poverty. 
1.5  Given the critical nature of the fund it is important that the funding reaches
communities as quickly as possible. In regard to this, members may be
minded to support the same initiatives as were agreed last year focusing on
Love Local cards, free school meal top ups and grants to four island
foodbanks as detailed in Table 1.   
RECOMMENDATIONS 
It is recommended that the Policy and Resources Committee:- 
Page 221 Agenda Item 11

Page 222

a) Note the funding announced by the Scottish Government for 2024/25
financial year for Local Authorities with responsibility for islands. 
b) Agree that arrangements for the fund are the same as those initiatives
agreed for 2023/24 and detailed in Table 1 to ensure that the support
reaches communities as quickly and effectively as possible. 
Page 222

Page 223

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
15 AUGUST  2024 
ISLANDS COST CRISIS EMERGENCY FUND 2024/25 
2.0 INTRODUCTION 
2.1 On 22 May 2024, the Scottish Government announced that Islands Cost Crisis
Emergency funding of £1m would be available for the 2024/25 financial year.
The funding will be distributed to the six Local Authorities with responsibility
for islands through the 2024/25 Local Government Revenue Grant.  The fund
will be administered by Scottish Futures Trust (SFT) on behalf of the Scottish
Government. 
2.2 This report provides the Policy and Resources Committee with an overview of
proposed arrangements for the fund in 2024/25. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee:-  
a) Note the funding announced by the Scottish Government for 2024/25
financial year for Local Authorities with responsibility for islands. 
b) Agree that arrangements for the fund are the same as those initiatives
agreed for 2023/24 and detailed in Table 1 to ensure that the support
reaches communities as quickly and effectively as possible. 
4.0  DETAIL 
4.1 The Scottish Government has announced that there will be an allocation of £1
million Island Cost of Crisis Emergency funding for 24/25 and this will be
distributed across the six Local Authorities with responsibility for islands. 
4.2  The funding is for the 2024/25 financial year only. The fund of £141,000 to Argyll
and Bute will be paid as a redetermination of the General Revenue Grant
during the last 2 weeks in March 2025. 
4.3  The allocation for Argyll and Bute in 23/24 was £141,000. Policy and Resources
Page 223

Page 224

Committee in August 2023 agreed to delegate the arrangements for Argyll
and Bute’s allocation of the 23/24 funding to the Executive Director with
responsibility for Development and Economic Growth in consultation with the
Leader, Depute Leader, Leader of the largest Opposition Group and the
Policy Lead for Islands the allocation was agreed as detailed in Table 1 below:- 
4.4 Given the critical nature of the fund it is important that the funding reaches
communities as quickly as possible. In regard to this, members may be
minded to support the same initiatives as were agreed last year focusing on
Love Local cards, free school meal top ups and grants to 4 island foodbanks
as detailed in Table 1.   
4.5 It should be noted that the current mechanism for providing the school meal top
up payments needs further discussion with the Education department to ensure
that the payments are reaching the eligible students directly.  Discussions will
also be required with colleagues in Revenue and Benefits regarding the uptake
of Love Local cards. 
5.0 CONCLUSION 
5.1 The £1 million Islands Cost Crisis Emergency Fund allocation will support those
on islands facing even more significant cost of living challenges.  Estimates
indicate that Islands are facing around 20% to 66% higher costs of living than
the UK average.  High fuel costs, a colder climate and the lack of consumer
choice is also intensifying the impact of the cost crisis.  Argyll and Bute Council’s
share of the fund is £141k based on our island population.   
6.0 IMPLICATIONS 
6.1  Policy – The Scottish Government’s £1 million Islands Cost Crisis Emergency
allocation will support those on islands facing even more significant cost of living
challenges. 
6.2  Financial – Argyll and Bute’s allocation of the £1 million fund will be £141,000. 
Table 1
ICCEF 2023/24 Distribution 
Argyll and Bute Council Love Local
Giftcards 
£100,000
Food Bank Grants  £16,000
Free School Meal Top Ups £25,000
TOTAL ICCEF 23/24 £141,000
Page 224

Page 225

6.3  Legal – None. 
6.4  HR – None. 
6.5  Fairer Scotland Duty: 
6.5.1 Equalities – None 
6.5.2  Socio-Economic Duty – None 
6.5.3  Islands – The Islands Cost Crisis funding announced by the
Scottish Government will help support our island communities
who are facing a higher cost of living than the UK average. 
6.6  Climate Change – If the option to continue using Love Local cards is taken
spend will be restricted to premises within Argyll and Bute.   
6.7  Risk – None. 
6.8  Customer Service – This funding will ensure the Council are supporting our
island communities and households across Argyll and Bute. 
6.9 The Rights of the Child (UNCRC) – No implications anticipated however the
funding will assist in tackling the cost of living crisis which aims to improve
finances for those on islands including children. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth   
Councillor Jim Lynch, Depute Policy Lead for Economic Development,
Housing, Communities and Islands 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth
Fergus.Murray@argyll-bute.gov.uk 
August 2024   
Page 225

Page 226

This page is intentionally left blank

Page 227

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
15 AUGUST 2024
RURAL GROWTH DEAL – UPDATE AND DETAILED DESIGN COSTS 
1.0 EXECUTIVE SUMMARY
1.1 This report provides an update on the Rural Growth Deal (RGD). The RGD will
deliver £50m of investment from the Scottish and UK Governments for projects
that are a driver for inclusive and transformational economic growth across the
region.  The Council and key delivery partners will also provide a minimum of
£20m of match funding throughout the 10-year Deal programme.  
1.2 The Council, UK and Scottish Governments agreed the ‘Heads of Terms’ for the
RGD on the 11th February 2021. The Heads of Terms Agreement sets out the
general areas for investment and the Full Deal Agreement builds upon this in
more detail.  
1.3 Signing of the Full Deal Agreement was scheduled for 7th June 2024 however
required to be postponed due to calling of the General Election. The RGD
Programme Management Office (PMO) are liaising with Civil Servants at both
the UK and Scottish Government level to agree a revised date for Full Deal
Signing following the General Election. 
1.4 The RGD PMO have procured the services of the consultancy Stantec to assist
with the development of business cases for the RGD programme.  All Projects
have now had at least one iteration of an Outline Business Case (OBC) or Full
Business Case (FBC) submitted to Government. An update on the position of
RGD business cases is included in Table 1 of this report.
1.5 To date, costs associated with business case and project development works
have largely been funded from the Council’s Inward Investment Fund. Match
funding has also been secured from a number of key partners such as HIE and
Scottish Enterprise.  The Policy and Resources Committee have previously
approved the release of 4 tranches of funding totalling £600k from the Inward
Investment Fund with authority delegated to the Internal Programme Board to
authorise spend to support Rural Growth Deal project development work.  At the
time of writing this report, total approved spend on RGD project development
work stands at £569,358.
1.6 Where possible, the RGD PMO will seek to recoup capital costs from RGD
funding allocations however, it will not be possible to submit any claims for
funding until the Full Deal Agreement has been signed and Full Business Cases
for projects are endorsed by Central Government.  Costs associated with the
Page 227 Agenda Item 12

Page 228

development of project Full Business Cases will require to be met by the Council
and strategic partners at risk in advance of funding being approved by Central
Government. 
1.7 The Policy and Resources Committee are therefore asked to approve a further
£150k of funding from the Inward Investment Fund to support the development
of RGD Full Business Cases and any associated pre-construction works e.g.
planning, detailed design and consultancy support.
1.8 The RGD PMO will continue to seek external match funding to support project
development costs and meet funding gaps.  To date, the Council and key
funding partners have secured over £20m of match funding that will directly
support projects within the RGD programme.  Given the significant funding
secured to date, throughout the lifetime of the programme it is considered likely
that RGD partners will exceed the £20m match funding commitment set out in
the Heads of Terms Agreement.
1.9 In advance of the completion of the Full Business Case (FBC), there remains a
significant amount of project development work to be undertaken, across the
majority of RGD Projects. This includes detailed design, procurement, site
investigation works and statutory consents. 
1.10 The development of detailed design for projects is a key stage, however it
comes at considerable expense and will bring a degree of risk to the Council
and RGD Partners. The appointment of a Detailed Design team will include an
Architect, Quantity Surveyor, Engineers and Project Manager support. As a
general estimate, up to 10% of project capital budgets should be set aside for
Detailed Design cost.
1.11 Kintyre Seasports will be the first project to receive OBC approval and this
project is programmed to begin construction in Autumn 2025.  There is therefore
an urgent need to progress detailed design work.  Tenders for this work have
identified costs of circa £238k for the design, consultancy and engineering
support necessary to see this project through to practical completion.  These are
capital costs which will be re-claimed from RGD funds following endorsement of
the Full Business Case.  It should however be noted, that all costs incurred in
advance of FBC endorsement are at risk to the Council.  
RECOMMENDATIONS: 
• Members should note that a revised date for Full Deal Signing will be
arranged once a new UK Government is formed.
• Approval is sought from the Policy and Resources Committee for a
further drawdown of funding from the Inward Investment Fund (up to
£150k).  Similar to previous arrangements, funds will only be drawn down
subject to the Chief Executive and two Executive Directors of the Council
being satisfied that the monies are for the purpose of delivering the Rural
Growth Deal. Any further funding required in excess of the approved
value will require further approval from the Policy and Resources
Committee. 
Page 228

Page 229

• Members are asked to approve spend of up to £250k to support the next
stage of project development for Kintyre Seasports, including Detailed
Design works. 
Page 229

Page 230

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
15 AUGUST 2024
RURAL GROWTH DEAL – UPDATE AND DETAILED DESIGN COSTS 
2.0 INTRODUCTION
2.1 This report provides an update on the Rural Growth Deal (RGD). The RGD will
deliver £50m of investment from the Scottish and UK Governments for projects
that are a driver for inclusive and transformational economic growth across the
region.  The Council and key delivery partners will also provide a minimum of
£20m of match funding throughout the 10-year Deal programme.  
2.2 The Council, UK and Scottish Governments agreed the ‘Heads of Terms’ for
the RGD on the 11th February 2021. The Heads of Terms Agreement sets out
the general areas for investment and the Full Deal Agreement builds upon this
in more detail.  
2.3 Signing of the Full Deal Agreement was scheduled for 7th June 2024 however
required to be postponed due to the UK General Election on the 4th July. The
RGD PMO are liaising with Civil Servants at both the UK and Scottish
Government level to agree a revised date for Full Deal Signing following the
General Election.
2.4 The RGD PMO have procured the services of the consultancy Stantec to
assist with the development of business cases for the RGD programme.  All
Projects now have at least one iteration of an OBC or FBC submitted to
Central Government. An update on the position of RGD business cases is
included in Table 1 of this report.  
2.5 To date, costs associated with business case and project development works
have largely been funded from the Council’s Inward Investment Fund. Match
funding has also been secured from a number of key partners such as HIE
and Scottish Enterprise.  The Policy and Resources Committee have
previously approved the release of 4 tranches of funding totalling £600k from
the Inward Investment Fund with authority delegated to the Internal
Programme Board to authorise spend to support Rural Growth Deal project
development work.  At the time of writing this report, total approved spend on
RGD project development work stands at £569,358.
2.6 Where possible, the RGD PMO will seek to recoup capital costs from RGD
funding allocations however, it will not be possible to submit any claims for
funding until the Full Deal Agreement has been signed and Full Business
Cases for projects are endorsed by Central Government.  All costs incurred in
Page 230

Page 231

advance of FBC endorsement are at the risk of the Council and project
stakeholders.  It should be noted that these costs are necessary in order to
progress projects through to FBC endorsement. 
2.8 The Policy and Resources Committee are therefore asked to approve a further
£150k of funding from the Inward Investment Fund to support the
development of RGD Full Business Cases and any associated pre-
construction works e.g. planning, detailed design and consultancy support.
2.9 The RGD PMO will continue to seek external match funding to support project
development costs and meet funding gaps.  To date, the Council and key
funding partners have secured over £20m of match funding that will directly
support projects within the RGD programme.  Given the significant funding
secured to date, throughout the lifetime of the programme it is considered
likely that RGD partners will exceed the £20m match funding commitment set
out in the Heads of Terms Agreement.
2.10 Kintyre Seasports will be the first project to receive OBC approval and this
project is programmed to begin construction in Autumn 2025.  There is
therefore an urgent need to progress the detailed design work necessary for
the project FBC.  Tenders for this work have identified costs of circa £238k for
the design, consultancy and engineering support necessary to see this project
through to practical completion.  These are capital costs which will be re-
claimed from RGD funds following endorsement of the Full Business Case.  It
should however be noted, that all costs incurred in advance of FBC
endorsement are at risk to the Council.   
3.0 RECOMMENDATIONS
• Members should note that a revised date for Full Deal Signing will be
arranged once a new UK Government is formed.
• Approval is sought from the Policy and Resources Committee for a
further drawdown of funding from the Inward Investment Fund (up to
£150k).  Similar to previous arrangements, funds will only be drawn down
subject to the Chief Executive and two Executive Directors of the Council
being satisfied that the monies are for the purpose of delivering the Rural
Growth Deal. Any further funding required in excess of the approved
value will require further approval from the Policy and Resources
Committee. 
• Members are asked to approve spend of up to £250k to support the next
stage of project development for Kintyre Seasports, including Detailed
Design works. 
Page 231

Page 232

4.0 DETAIL
4.1 Business Case Progress Update
4.1.1 The Council agreed the ‘Heads of Terms’ for the RGD on the 11th February
2021. The next key milestone is the signing of the Full Deal Agreement. This
was arranged for 7th June 2024, however required to be postponed due to the
announcement of a General Election. A revised date for Full Deal Signing will be
agreed once the new UK Government is formed and it is hoped that this
milestone can be reached by September 2024. 
4.1.2 Upon signing the Full Deal Agreement, the Council will enter year 1 of a 10-year
programme of delivery for the RGD.  It is currently anticipated that Year 1 will be
2024/25, with the Deal reaching completion in 2034/35. 
4.1.3 The RGD PMO have been working with Stantec and key delivery partners to
progress Business Cases for RGD projects.  All projects now have at least 1
iteration of an OBC or FBC submitted to UK and Scottish Government. The
RGD PMO and Project Leads have been working to address feedback received
and a number of OBCs are now nearing approval.  An update on Business Case
Progress for each RGD Project is provided in Table 1 below:-
Table 1 Business Case Tracker
Project Stage Next Milestone
Rothesay
Pavilion 
2nd iteration of FBC submitted
to Government on 8th May
2024. 
A number of meetings have
been held between
Government and the Council
to discuss conditions that
would allow endorsement of
the FBC to allow the next
stage of contracts to be
awarded. 
Conditional
Endorsement of
FBC 
Kintyre Seasports The OBC was approved by
Government on 4th July 2024.  
Detailed Design
Low Carbon
Economy - Islay
Government advised that
they were not content to
proceed with the project that
was in the first Outline
Business Case. Therefore
the project has gone back to
initial options appraisal stage.
Engagement with
stakeholders is ongoing to
redevelop project options.  
Completion of
options appraisal
and identification of
new preferred
option. 
Page 232

Page 233

Rural Skills
Accelerator
Programme OBC
A second iteration of the
OBC was submitted to
Government on 23rd May
2024.
Feedback to be
provided by
Government.  
Housing – Isle of
Mull
Second iteration of OBC
submitted on 2nd May 2024. 
Feedback/approval
of OBC
Housing – Isle of
Islay
Feedback received on the
first iteration OBC on 29th
May 2024. Project Leads are
considering feedback in
advance of re-engaging with
Stantec.    
Second iteration
OBC to be drafted
by Stantec.  
Clyde
Engineering &
Innovation Centre
Feedback on second iteration
OBC was received on 24th
April 2024. PMO and Stantec
currently working to address
outstanding comments. 
Third iteration to be
submitted to
Government. 
West Coast UAV 3rd iteration OBC submitted
to Government on 20th May
2024.   
Feedback/approval
of OBC
Marine
Aquaculture
Programme –
Marine Industry
Training Centre
Second iteration OBC
submitted to Government on
26th April 2024. 
Feedback to be
provided by
Government 
Marine
Aquaculture
Programme –
SAMS
International
Seaweed &
Shellfish Industry
R&D Centre
Feedback received on 2nd
April 2024 on second
iteration OBC. SAMS/HIE
currently reviewing feedback
and redrafting OBC.
Third iteration OBC
to be submitted to
Government
Marine
Aquaculture
Programme –
Marine
Environmental
Research
Laboratory
Second iteration OBC
submitted to Government in
June 2024.  
Feedback to be
provided by
Government.   
Page 233

Page 234

4.2 Full Business Case Costs
4.2.1 To date, costs associated with business case and project development works
have largely been funded from the Council’s Inward Investment Fund. Match
funding has also been secured from a number of key partners such as HIE and
Scottish Enterprise.  The Policy and Resources Committee have previously
approved the release of 4 tranches of funding totalling £600k from the Inward
Investment Fund with authority delegated to the Internal Programme Board to
authorise spend to support Rural Growth Deal project development work.  At the
time of writing this report, total approved spend on RGD project development
work stands at £569,358. 
4.2.2 There is an Earmarked Reserve of £540,897 for the Inward Investment Fund,
with £307,232 of this previously committed. Therefore there is a remaining
balance of £233,665 available to support the development of the Rural Growth
Deal.
4.2.3  A number of the Outline Business Cases are nearing approval and it is not
expected that further funds will be required to support Outline Business Cases,
with the exception of the Islay Low Carbon Economy project which is still at
options appraisal stage. The RGD PMO have been scoping requirements for
FBCs, and it is anticipated that the costs associated with development of the
FBC for each project will be in the region of £20k-£30k. At this time, a total of 14
FBCs will be required across the programme. Some of these will be funded by
RGD Partners such as HIE. 
4.2.4 The RGD PMO have commissioned Stantec to undertake the FBCs for the
Kintyre Seasports and Tobermory Housing projects, given these projects will be
delivered in the early phases of the RGD Programme. The FBC for Rothesay
Pavilion has already been completed and the Council is in the process of
agreeing a conditional endorsement of £9m of RGD funding for this project.
4.2.5 The Policy and Resources Committee are asked to approve a further £150k of
funding from the Inward Investment Fund to support the development of RGD
FBC’s and associated pre-construction works e.g. planning, detailed design and
consultancy support.  Aligned with previous arrangements, funds will only be
drawn down subject to the approval of the Council’s Chief Executive and two
Executive Directors. Any further drawdown from the Inward Investment will
require approval of the Policy and Resources Committee.
5.0 Detailed Design Costs
5.1 A significant amount of project development work is necessary in order to
complete Treasury Five Case compliant FBC’s.  This includes detailed design,
construction tenders and statutory consents.  In order to develop FBCs the
following milestones should be completed:
• Design to RIBA Stage 4 (Technical Design);
• All consents should be approved (including Planning, Building Warrant
etc);
Page 234

Page 235

• Procurement – costs in the FBC should be based on a tendering
exercise;
• Match funding – must be identified and approved by funders;
• Any Legal agreements between the Council and Partners should be
finalised;
• Carbon Impact Assessments finalised; 
• Equalities Impact Assessments finalised; 
• Programme of works agreed. 
5.2 Pre-construction activities such as Detailed Design incur considerable
expense for the Council and RGD Partners. The appointment of a Detailed
Design team will include an Architect, Quantity Surveyor, Engineers and
Project Manager support. As a general estimate, up to 10% of project capital
budgets should allocated for Detailed Design costs. 
5.3 Detailed design has to be undertaken to inform the project FBC therefore
spend will be incurred at risk to the Council and project partners.  The figure
below details the approvals process for RGD projects in advance of funding
drawdown:- 
5.4 The key risk the to the Council and project partners is construction tenders
being unaffordable and projects having funding gaps requiring additional
match funding or a requirement to value engineer or reallocate RGD funds.  In
this scenario the Council and/or RGD Partners could have incurred significant
abortive costs associated with project development work.   
5.5 Funding of project development costs is a risk that is common across all City
Region and Growth Deals in the UK.  Appendix 1 includes projected
timescales for detailed design development and FBC submission for the wider
RGD programme. It should be noted that these are current projected
timescales and that it is likely that they may change depending on project
development progress. Projects are currently profiled to ensure compliance
with a funding drawdown of circa £5m per annum. 
5.8 Where there is a requirement to fund detailed design and project development
costs upfront, a report on each project will be brought to the Policy and
Resources Committee to allow Members to consider the request and
associated costs and risks. 
6.0 Kintyre Seasports   
6.1 Kintyre Seasports received OBC approval on 4th July 2024. This project seeks to
redevelop the existing Campbeltown Sailing Club facility into a modern
watersports facility. The total budget available for capital works through the
Outline Business Case
approved by
Government
1. Detailed
Design/Consents/Impact
Assessments Undertaken
2. Construction Tender 
Full Business Case
submitted to
Government for
endorsement
FBC endorsed by
Government
1. Contracts for
construction awarded
2. Claims made to
Government for project
costs quarterly
Page 235

Page 236

Rural Growth Deal is £2m. The RGD PMO and Kintyre Seasports continue to
seek other opportunities for match funding. 
6.2 This project is programmed to begin construction in Autumn 2025, therefore
there is a urgent need to progress the detailed design work necessary for the
FBC.  This project has already scoped detailed design requirements and
undertaken a tender however was subsequently abandoned as the tendered
costs returned were in excess of the threshold for an unregulated procurement.
There was only one tender return with a value of circa £238k. The scope of
works included all detailed design and support through to handover of the new
facility.
6.3 Procurement activity has been undertaken on an “on behalf” of basis with Argyll
and Bute Council undertaking procurement activity on behalf of Kintyre
Seasports. It is proposed that Argyll and Bute Council would pay all invoices
associated with works, given that Kintyre Seasports would be unable to cash
flow the project themselves.
6.4 The RGD PMO and KSS are liaising with colleagues from the Council’s
Procurement Team to agree next steps.  The PMO are also investigating
opportunities associated with a design and build contract or a reduced scope of
works to try and limit financial risk to the Council and KSS.
6.5 Members are asked to approve spend of up to £250k to support the next stage
of project development for Kintyre Seasports, including Detailed Design works. It
is expected that the cost of this will be retrospectively claimed from the Rural
Growth Deal following endorsement of the project FBC by Central Government. 
With the exception of Rothesay Pavilion, this is the first project within the RGD
programme to reach detailed design stage. 
7.0 CONCLUSION
7.1 The next key milestone in the RGD process is the signing of the Full Deal
Agreement. It is anticipated that a revised date for Full Deal Signing will be
agreed with Central Government following the UK General Election on the 4th
July.   
7.2 The RGD PMO continue to work with key stakeholders and Stantec to develop
RGD projects and progress associated project business cases. To date, all
projects within the RGD programme have submitted at least one iteration of their
OBC or FBC to Central Government and have received feedback.  It should be
noted that this process can take several months.   
7.3 The Policy and Resources Committee have previously approved the release of
4 tranches of funding totalling £600k from the Inward Investment Fund with
authority delegated to the Internal Programme Board to authorise spend to
support Rural Growth Deal business case and project development work.  At the
time of writing this report, total approved spend on RGD development work
stands at £569,358.
Page 236

Page 237

7.4 Following signing of the Full Deal Agreement, it will be necessary to draft FBC’s
for all projects.  Drawdown of RGD funding is subject to endorsement of FBC’s
by Central Government.  This will require further project development work such
as detailed design, planning and consultancy support which is necessary in
order to develop Treasury compliant FBC’s.
7.5 The Policy and Resources Committee are asked to approve a further £150,000
draw down from the Inward Investment Fund to support the development of Full
Business Cases and associated project work.    
7.6 The OBC for Kintyre Seasports will shortly be approved and the Policy and
Resources Committee are asked to approve spend of up to £250k on this
project to support the next stages of development, including detailed design
works. It is expected that these costs will be retrospectively claimed from the
RGD funds following endorsement of the FBC by Central Government.
7.7 Members are asked to note that all spend in advance of FBC endorsement is at
risk to the Council and key project partners however, this is necessary in order
to achieve endorsement of RGD projects by Central Government. 
8.0 IMPLICATIONS
8.1 Policy – The RGD is consistent with the Council’s Economic Strategy.
8.2 Financial –  RGD Projects require a level of upfront spend at risk to allow project
development to progress. Support will be required from Financial
Services. There are limited remaining funds in the Inward Investment
Fund to support Rural Growth Deal Development costs, however capital
costs can be claimed back from RGD funds following endorsement of
FBCs and at the discretion of the Section 95 Officer. 
8.3  Legal – The RGD may require input from Legal Services as part of the Full Deal
Signing.
8.4  HR – None at present.
8.5  Fairer Scotland Duty: Required as part of OBC process.
8.5.1   Equalities - protected characteristics - Equality Impact
Assessments are required for all RGD projects.
8.5.2   Socio-economic Duty - The Rural Growth Deal will follow
Scottish Government guidance on Inclusive growth including
measures to address socio-economic disadvantage
8.5.3   Islands – Islands impact assessments required as part of OBC
process where necessary.
8.6  Climate Change – Carbon Management Plans are required for all RGD
business cases. 
Page 237

Page 238

8.7 Risk – Spend incurred in advance of approval of FBCs will be at risk to lead
partner.
8.8 Customer Service – None at present. 
8.9 The Rights of the Child (UNCRC) – None at present. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth 
Councillor Jim Lynch, Leader of Argyll and Bute Council 
June 2024                                      
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Jonathan Welch, Transformational Projects and Regeneration Manager
Jonathan.Welch@argyll-bute.gov.uk   
APPENDICES 
Appendix 1 – Rural Growth Deal Projected Programme (as at July 2024) 
Page 238

Page 239

Appendix 1: Rural Growth Deal Projected Programme (as at July 2024)
The following table shows the current projected delivery timeframe for RGD Projects.
It should be noted that there may be changes to the Programme as projects
progress through their development stages.
Project  OBC
Approval
Pre-
Construction
Phase*
FBC
Endorsement 
Projected
Construction
Start 
Rothesay Pavilion N/A Stage 1
works
ongoing
Conditional
Endorseme
nt expected
July 2024
Stage 2 & 3
due to start
September/
October
2024 
Kintyre Seasports  Received
July 2024
July 2024-
July 2025
Expected
September
2025
October
2025
Creating a low carbon
economy – Islay 
Project has
returned to
options
appraisal.
TBC TBC TBC
RSAP - South STEM
Hub (Dunoon) 
Rural Skills
Accelerator
Programme
Level OBC
is expected
to be
approved by
October
2024 
2024/25-
2025/26
Expected
2026/27
2026/27
RSAP - North STEM
Hub (Oban)
2025/26-
2026/27
Expected
2026/27
2026/27
RSAP - UHI Argyll
College Built
Environment (Dunoon)
2027/28-
2028/29
Expected
2028/29
2028/29
RSAP - Business Skills N/A Expected
December
2024
Delivery of
Business
Skills
Programme
to begin in
2025/26
Housing - Isle of Mull Expected
August
2024
2024-2025 Expected
December
2024
2025/26
Housing - Isle of Islay  Expected by
March 2025
2027/28 Expected
2027/28
2028/29
Clyde Engineering and
Innovation Cluster
Expected
August
2024
2027/28-
2028/29
Expected
2029/30
2029/30
West Coast Aviation,
UAV, Robotics and
Compliance Hub
Expected
August
2024
2030/31 Expected
2031/32
2032/33
MAP - Machrihanish
Innovation Campus
Expected
September
2024
2025/26 Expected
2025/26
2025/26
MAP - SAMS
International Seaweed
Expected
September
2024
2026/27-
2027/28
Expected
2027/28
2027/28
Page 239

Page 240

and Shellfish Industry
R&D Centre
MAP - Marine Industry
Training Centre
Expected
October
2024
2026/27-
2027/28
Expected
2027/28
2027/28 
Page 240

Page 241

Page 1 of 6 
ARGYLL AND BUTE COUNCIL          POLICY & RESOURCES COMMITTEE
CUSTOMER SUPPORT SERVICES      15th August 2024 
DATA STRATEGY AND ACTION PLAN 2024-2028 
1.0 EXECUTIVE SUMMARY 
1.1 In accordance with the presentation to the Members’ Seminar on 21st November
2023, the council’s Data Advisory Group has prepared a new Data Strategy and
Action Plan for 2024-28 which is attached. 
1.2 This Data Strategy aims to achieve Argyll and Bute Council’s “Connect for
Success” objective of embedding data and evidence driven decision-making at
every level of the organisation.  It will also advance the new mission statement
stated in the data strategy of “Improving outcomes for our residents and
communities through better combination and use of data”. 
1.3 This Data Strategy will sit alongside Argyll and Bute Council’s existing ICT &
Digital Strategy for 2021-24 and its forthcoming update for 2025-28. 
1.4 Policy & Resources Committee is asked to endorse the Data Strategy and
Action Plan for 2024-28, attached at Appendix 1.   
Page 241 Agenda Item 13

Page 242

Page 2 of 6 
ARGYLL AND BUTE COUNCIL          POLICY & RESOURCES COMMITTEE
CUSTOMER SUPPORT SERVICES      15th August 2024 
DATA STRATEGY AND ACTION PLAN 2024-2028 
2.0 INTRODUCTION 
2.1 In accordance with the presentation to the Members’ Seminar on 21st November
2023, the council’s Data Advisory Group has prepared a new Data Strategy and
Action Plan for 2024-28 which is attached and presented for noting. 
2.2 This Data Strategy aims to achieve Argyll and Bute Council’s “Connect for
Success” objective of embedding data and evidence driven decision-making at
every level of the organisation.  It will also advance the new mission statement
stated in the data strategy of “Improving outcomes for our residents and
communities through better combination and use of data”. 
2.3 This Data Strategy will sit alongside Argyll and Bute Council’s existing ICT &
Digital Strategy for 2021-24 and its forthcoming update for 2025-28. 
3.0 RECOMMENDATIONS 
Members are asked to:
3.1 Endorse the new Data Strategy and Action Plan for 2024-28, attached at
Appendix 1. 
3.2 Recognise the value and importance of data for decision-making. 
Page 242

Page 243

Page 3 of 6 
4.0 DETAIL 
4.1 Principle 4 of the council’s “Connect for Success” programme calls for the
pursuit of data and evidence driven decision-making.  To help make this
happen, in March 2022 the council’s Data Advisory Group was established as a
one-council, cross-service forum for considering data-focussed solutions to
operational and strategic challenges.  At the end of 2022 this group arranged for
the council’s participation in cohort 2 of the Scottish Government’s Data Maturity
programme within their new public sector Data Transformation Framework.   
4.2 Not surprisingly, the data maturity assessment results indicated strengths in
some areas but weaknesses in others, as summarised in the table below:  
Data Maturity Assessment Results
(December 2022)
Data Maturity Metric Score*
Data Assets 3.8
Data Culture 3.8
Data Use 3.7
Data Skills 3.5
Data Leadership 3.4
Data Analysis 3.3
Data Tools 3.3
* Scores rated on a scale from 0 to 5. 
These results are comparable to those of other Scottish Local Authorities who
have completed the assessment.  The Data Advisory Group has used these
results as a catalyst to help structure the data strategy and action plan which
will build upon the strengths and address those areas with lower scores. 
4.3 The objectives of the data strategy and action plan cover 12 themes grouped
around People, Processes and Technology.  The document recognises that all
three of these areas are critical, and to focus only on one or two is unlikely to
lead to success.   Each of the 12 themes are described in page 4 of Appendix 1. 
4.4 A key benefit of the Data Strategy and Action Plan will be to prioritise attention
and resources toward the most relevant data challenges and opportunities.  The
document covers a 5-year period during which opportunities will arise both from
within the council and from trends emerging outside the council.  The strategy
will provide a framework through which such opportunities can be assessed, so
that new opportunities offering ways to progress objectives laid out in the
strategy will have stronger justification for attention and resourcing.
Page 243

Page 244

Page 4 of 6 
4.5 Elected Members will have a key role in helping the Data Strategy and Action
plan to succeed by: 
a) Endorsing the new data strategy and its objectives;
b) Being advocates for open data and helping to identify opportunities to
publish useful information residents will find valuable;
c) Making use of the new PowerBI version of the Area Committee
Scorecard report available in the Members Area of the Hub;
d) Supporting new and innovative uses of data across council services and
in conjunction with trusted external partners;
e) Recognising the value and importance of data for decision-making. 
4.6 Throughout the activities within the action plan accompanying the data strategy
there is an essential role for the council’s services.  The Data Advisory Group
and the Data Programme will provide tools, such as the council’s new Data
Platform and Microsoft’s PowerBI, and shared learning on successful
implementations of these tools for other services to consider emulating.  It is,
however, within the services themselves that the subject matter expertise
relating to their service demands and operations sits, so their active participation
in the Data Advisory Group and the broader data strategy activities will be
essential. 
5.0 CONCLUSION
5.1 Argyll and Bute Council is recognised nationally for its innovative use of data, for
example having been cited as a case study in the Scottish Government and
COSLA’s Data Strategy for Health and Social Care in February 2023 for using
data to deliver integrated care.  The council’s new Data Strategy and Action
Plan for 2024-28 will continue the focus on harnessing the value of the council’s
data to improve service delivery and ultimately outcomes for our residents and
communities. 
6.0 IMPLICATIONS
6.1 Policy  A new Data Strategy and Action Plan has been
developed to cover the period from 2024 to 2028. 
This aligns with the ICT & Digital Strategy for 2021 to
2024 and its forthcoming update for 2025-28. 
Page 244

Page 245

Page 5 of 6 
6.2 Financial 
6.3 Legal 
6.4  HR 
6.5  Fairer Scotland Duty: 
6.5.1  Equalities -
protected
characteristics 
6.5.2  Socio-
economic
Duty 
6.5.3  Islands 
6.6  Climate Change 
6.7 Risk 
Delivering the objectives of the data strategy will
require the council to continue its track record of
investment in: 
a) Microsoft licenses, with diligence identifying and
maximising value-for-money; 
b) ICT physical assets such as the new data
platform and associated infrastructure; 
c) Human resource through training and skills
development.  
New opportunities to advance the strategy which can
be maximised by one-off expenditure or further
revenue investment will be raised through existing
DMT and SMT governance channels. 
Aims to ensure compliance with all relevant
legislation. 
Several of the aims of the data strategy and action
plan will lead to positive outcomes for staff, including: 
a) learning pathways to enhance workforce data
literacy and skills,
b) An enhanced data culture in the organisation. 
c) Having more time to spend on rewarding tasks
such as interpreting data to gain service insight,
rather than the repetitive effort of data collection
and manual processing. 
Better use of data will lead to positive outcomes for
service users in several ways, including reduced risk
of unintentional bias against service users with
protected characteristics. 
Better use of data will allow services to be designed
and delivered around a more complete
understanding of the status and socio-economic
needs of our residents and communities. 
More effective use of data will enable the council to
better take account of intersectional/geographic
disadvantage and tailor service delivery and resource
prioritisation accordingly. 
Since in its first few stages the data strategy will
focus on maximizing use of council ICT’s existing on-
premise SQL Server infrastructure no noticeable
increase in carbon cost is expected. 
The strategy aims to manage data protection risks by
embedding strong data governance and staff
Page 245

Page 246

Page 6 of 6 
6.8  Customer Service 
6.9 The Rights of the
Child
(UNCRC)
awareness of their fundamental responsibility to care
for the council’s data. 
Potential to further improve services through data
driven decision making leading to positive outcomes
for staff and customers. 
A well-implemented data strategy can help local
authorities uphold these rights. For instance, the data
platform will combine datasets from across local
government and provide frontline professionals with
better awareness of the children receiving services.   
Kirsty Flanagan
Executive Director with responsibility for Customer Support Services
Policy Lead: Mark Irvine
15th August 2024                                                  
For further information contact: Jane Fowler, Head of Customer Support Services 
Tel 01546-604466 or Gerry Wilson, ICT and Digital Manager Tel 01436-658936 
APPENDICES
Appendix 1 – Data Strategy and Action Plan 2024-28
Page 246

Page 247

Data Strategy & Action Plan
2024 - 2028  Page 247

Page 248

Data Strategy & Action Plan: 2024-2028
Page 2 of 19 
Introduction  Purpose 
The purpose of this data strategy and action plan is to introduce and advance the council’s new mission
statement for data: 
“To improve outcomes for our residents and communities
through better combination and use of data.” 
This mission closely aligns with two of the council’s “Connect for Success” Change Programme principles: 
Principle 4: data and evidence driven decision making.
Principle 7: maximising opportunities from technology. 
The importance of data and evidence driven decision making in Principle 4 cannot be over-stated.  These are
unprecedented times with local authorities facing signficant, prolonged, funding challenges.  The ability to
focus limited resources in ways that deliver the greatest value and impact has never been more important.  To
do so the council must have an informed understanding of the circumstances, needs and demands of our
residents and communities.  This will require harnessing the data we hold, and combining it with data from the
wider public sector and other sources, so as to have a more complete picture of the lived realities of those we
serve.   
Background 
To achieve the objectives above, the council must lay solid foundations upon which to build a new one-council
approach to data.  This process began in March 2022 with the creation of the council’s new Data Advisory
Group (DAG).  With representation from across the council’s services, the DAG represents a one-council,
service-led forum for data. 
Toward the end of 2022 the DAG planned and prepared the council’s participation, along with several other
local authorities, in the Scottish Government’s Data Maturity Assessment programme which included a staff
survey on data.  The assessment gave a score for data maturity across seven metrics with results summarised
in the following table… 
Page 248

Page 249

Data Strategy & Action Plan: 2024-2028
Page 3 of 19 
Data Maturity  Argyll & Bute Council
Data Maturity Assessment Results
(December 2022)
Maturity Metric Score*
Data Assets 3.8
Data Culture 3.8
Data Use 3.7
Data Skills 3.5
Data Leadership 3.4
Data Analysis 3.3
Data Tools 3.3
* Scores rated on a scale from 0 to 5. 
Our scores for these data maturity metrics were very similar to those of other councils.  For example the high
score for “Data Assets” shows that local authorities are commonly “data rich” with many and varied sets of
adminstrative data collected in relation to the operation of council services.  Whereas for tools and analysis all
councils commonly face the challenge of having data split across multiple silos, stored in systems which do not
readily interact with each other, making a one-council approach to analysing and working with data a
significant challenge. 
Where we do score well is on “Data Culture”.  This can be a difficult concept to define but a clear indicator of
data culture is the quality and nature of the conversations that happen within the organisation about data, its
importance, and our responsibility for it.  It is likely we scored comparatively well for this theme due to the
positive influence of the Data Advisory Group which at the time of the assessment had been functioning for six
months and was already encouraging cross-service conversations about data. 
Within the Data Maturity Framework our scores were rated as “Developing” maturity and our aim is to
progress through to the “Mastering” stage with improved scores between 4 and 5.  This is where our data
strategy and action plan will drive change.  To truly succeed in our mission to improve outcomes with data, by
making decisions based on reliable and timely data, we need to harness data as a one-council resource,
unhindered by silos, and with a workforce empowered with the skills they need to gain valuable insights from
data.  Therefore this strategy and action plan will focus on twelve strategic themes below…
Page 249

Page 250

Data Strategy & Action Plan: 2024-2028
Page 4 of 19 
Strategic Themes  Items underlined in the following summary of strategic themes relate to the maturity metrics from the Data
Maturity Assessment above: 
People Empowering our workforce
with data literacy and skills.
 Making available suitable
learning pathways for all
council staff.
Defining data roles and
responsibilities.
 Providing data leadership
and nominated data owners
in each service.
Embedding a strong data
culture.
 Encouraging innovation
through a one-council
approach.
Processes Supporting service
transformation.
 Providing clear insight
and understanding of
service demand and
citizens’ needs.
Embedding good data
governance.
 Ensuring data quality,
standards, security, ethics
and compliance are
maintained at all times.
Supporting workflow and
process automation.
 Reducing unnecessary
effort, data duplication
and manual data
handling.
Shifting from reactive to
predictive service delivery.
 Through trend
monitoring, forecasting &
other proactive analysis.
Maximising council performance
and resource prioritisation.
 Improving collation and
distribution of performance
and benchmarking data.
Broadening open data
sharing.
 Making more datasets
available on the council
website.
Technology Developing the data platform
and associated data
architecture.
 Making shared resources
and data assets available
to services for more
effective data use.
Enabling adoption of PowerBI, AI
and other data tools.
 Creation and use of more
powerful reports and
processes to support
operational and strategic
decision making.
Factoring data features into
line of business systems.
 Working with council
services and Procurement
to ensure new systems
have rich data
capabilities. 
The “Action Plan by Theme” section below aligns with the strategic themes above and outlines specific,
achievable activities for the five year period 2024-2028 to advance our data maturity.  These activities will be
coordinated within the council’s data programme…
Page 250

Page 251

Data Strategy & Action Plan: 2024-2028
Page 5 of 19 
The Data Programme 
The council’s data programme is the combination of groups and resources which together will drive forward the
council’s strategic objectives for data.  The key elements of the data programme are summarised below. 
The Data Advisory Group (DAG) 
Created in March 2022 and chaired by the Head of Customer and Support Services, Jane Fowler, the DAG
includes representatives from across council services and works with the Executive Leadership Team to define
the data requirements for strategic, data-driven, decision making.  The DAG will have a crucial role to play in
delivery of the data strategy action plan deliverables below and so is referred to in many of the specific activities. 
The Data Technical Group (DTG)
Including more data-facing representatives from across council services, the DTG scopes and translates the
DAG’s data requirements into technical specifications for deliverable data products, including PowerBI reports
and dashboards.  In practice there will be multiple short-life working groups within the DTG focussed on
addressing specific requirements, sometimes across multiple services.  Crucially there will always be
representation in the DTG sub-groups from the services who expect to gain value from the new data product
being implemented so as to bring their service-specific subject matter expertise to the solution.  The Legal and
Regulatory team will also be involved, especially on products where there’s any use of personally identifiable
information.  In some cases there may also be involvement from external third-parties who can bring a valued
technical perspective, such as the Improvement Service, Public Health Scotland, etc. 
The Data Product Roadmap 
The roadmap represents the pipeline of data products with delivery dates scheduled through continuous
negotiation between the DAG and DTG.  Together they will agree on priority setting and securing the resources
required to support the development of specific data products, e.g. where costs may be incurred with system
suppliers for essential data feature development, etc.  In this context data products will include not only PowerBI
reports and dashboards, but also solutions for process workflow and automation where the DAG has reviewed
challenge solution proposals from the nominating service(s). 
Microsoft PowerBI 
One of the products in the Microsoft 365 (M365) productivity suite, PowerBI includes some familiar aspects of
Microsoft Excel but with much greater capacity to combine and visualise data from multiple sources.  Since the
council has a long-term plan for the adoption and utilisation of M365 it is expected that PowerBI will form a key
component of the strategy’s one-council approach to data.  However if during the lifetime of this strategy
Page 251

Page 252

Data Strategy & Action Plan: 2024-2028
Page 6 of 19 
The Future 
Microsoft’s commitment to PowerBI changes then there are other similar non-Microsoft products on the market
which can be used instead, such as Tableau, SAP Analytics, and others. 
The Data Platform 
In effect this will be the council’s first implementation of a data warehouse or data lake.  (In essence, the
difference is a data warehouse is designed to apply a high degree of structure and organisation to data when it is
stored, whereas a data lake is designed to accumulate large volumes of data at a more rapid pace with less focus
on organising and structuring the data at the point of collection.)  The Data Platform will be essential to allowing
“democratised” access to data for use in PowerBI report building by services themselves, working within or
along-side the DTG sub-groups. The Data Platform will also allow for access to datasets to be controlled and
managed by a robust permissions framework; ensure consistent application of data quality, ethics and
standards; and enable the FAIR Principles of making data Findable, Accessible, Interoperable and Re-usable. 
In conclusion, the data programme will orchestrate the efforts of the groups and resources above so as to
ensure council priorities are met.  It will also ensure the data products green-lit by the DAG are developed by the
DTG sub-groups and delivered on time in accordance with the data product roadmap by leveraging PowerBI, the
data platform and other suitable data tools and resources.   
The next five years will likely see technological change at an unimaginable pace.  In June 2018, the research
organisation OpenAI first introduced the concept of Generative Pre-trained Transformers (GPTs).  Five years
later, in March 2023, they released GPT-4 which began to fundamentally transform how we as humans interact
with immense volumes of digitised data using natural language.  Just as five years ago few anticipated where
OpenAI’s GPT research might lead, so we expect our own data strategy and action plan will need to be a living
document.  As the front-line of data innovation advances we will keep this strategy and the following action plan
under review, and updates will be made where necessitated by the pace of change around us.   
Page 252

Page 253

Data Strategy & Action Plan: 2024-2028
Page 7 of 19 
Action Plan by Theme
People Empowering our workforce with DATA LITERACY & SKILLS
What success will look like:
 Everyone in the organisation will have confidence in their ability to:
 Understand the importance and relevance of the data they help to collect and rely on for their work.
 Suggest new ways in which data can be harnessed to improve service delivery and business outcomes.
 Apply critical thinking to data presented in reports and analysis so as to validate conclusions and recommendations in them. 
 Everyone will have access to skills development resources and learning opportunities to progress through pathways designed to be relevant to
how they use data.
 Decisions taken at every level of the organisation will be informed by critical thinking applied to relevant, timely, reliable data.
WHAT WHY WHO BY WHEN
The corporate training programme will be updated to
include suitable learning opportunities around data.
A key driver of success is ensuring our
employees have the necessary data skills and
knowledge available to them.
Data Programme, 
HROD
April 2024
Pilot adoption of some or all of the data skills
development resources emerging from the Scottish
Government’s public sector Data Transformation
Framework programme through the work being
conducted between Perth & Kinross Council, the
Scottish Digital Academy (SDA) and others. 
A shared need to develop and embed workforce
data skills emerged as a common theme from
the local authorities who, like us, completed
data maturity assessments.  The SDA are
piloting a persona-based data skills curriculum
which, having learning pathways tailored to
local government, could have tangible benefits
for the whole council.
Scottish Government’s
Data Transformation
Framework, 
SDA,
Data Programme,
HROD
December 2024
The Data Advisory Group (DAG) will provide a route
through which council services can raise challenges
arising around data skills so that suitable measures to
address them can be considered.  The Data Programme
will provide an annual report summarising these
emerging requirements to HROD.
A crucial role of the DAG is to act as a one-
council forum for data.  By services discussing
skills requirements and challenges at the DAG,
common themes will emerge which HROD can
take as inputs for planning the skills
development programme.
Data Advisory Group, 
Data Programme,
HROD
April 2024
April 2025
April 2026 
April 2027 
April 2028
Repeat the Data Maturity Assessment from the Scottish
Government’s Data Transformation Framework, after
some of the above measures have been implemented.
To measure progress in the data maturity skills
journey against the 2022 baseline and identify
the next stages of development required.
Data Programme,
Data Advisory Group
Dec 2025
Page 253

Page 254

Data Strategy & Action Plan: 2024-2028
Page 8 of 19 
People Defining DATA ROLES & RESPONSIBILITIES
What success will look like:
 Everyone will understand the importance of data to their work, to the council’s operations, and to positive outcomes for our citizens.
 Everyone will understand their own personal role(s) and responsibilities for data, ranging from ensuring accuracy at point of collection, to
data owners’ authorisation of re-use of data in a safe and compliant manner.
 Processes and procedures agreed and adopted for the compliant and ethical use and management of data will be clearly understood and
consistently adhered to across the organisation.
WHAT WHY WHO BY WHEN
Members of the Data Advisory Group (DAG) will be
provided with an updated Terms of Reference for the
group.
Members of the DAG play an important role in
reviewing, assessing and prioritising data
challenge proposals from services.
Data Programme March 2024
A new Terms of Reference for the Data Technical Group
(DTG) will be produced and shared with participants in
the sub-groups.  This will have a particular focus on the
important role staff involved in DTG sub-groups play in
ensuring appropriate data governance (see related
“Processes” theme).
DTG sub-groups are short-life working groups
established to develop specific data products. 
Some members are fixed (Legal & Regulatory)
while others will engage only as and when
required, so a clear understanding of roles is
especially important for these sub-groups.
Data Programme 
Information
Management 
Steering Group
March 2024
The Argyll and Bute Manager programme will be updated
to promote data and evidence-driven behaviours.
Manager’s behaviours around data will be
important in ensuring the positive impact of
data on service delivery and outcomes.
HROD,
Data Programme,
Data Advisory Group
December 2024
Continued engagement with the Scottish Government’s
public sector Data Transformation Framework
programme for guidance on good practice when defining
roles and responsibilities relevant to the Scottish public
sector and local government in particular.  The Data
Programme will provide an annual report to the DAG
summarising the material emerging from the framework
with recommendations for action/adoption.
From the local authorities who, like us, have
conducted data maturity assessments a
shared need emerged for everyone to
understand their roles and responsibilities in
relation to data.  In absence of such
understanding staff may sometimes assume
data quality, security, compliance, etc., are
someone else’s responsibility.
Scottish Government’s
Data Transformation
Framework, 
Data Programme,
Data Advisory Group
April 2024
April 2025
April 2026 
April 2027 
April 2028
The council’s Data Catalogue will be instituted and will
include the services’ nominated data owners for each
line-of-business system.  
These service data owners will be involved via
the DTG sub-groups when their systems are
deemed relevant to a specific data product.
Data Programme  March 2024  
Page 254

Page 255

Data Strategy & Action Plan: 2024-2028
Page 9 of 19 
People Embedding a strong DATA CULTURE
What success will look like:
 We will take a one-council approach to data, with data silos being less of a barrier to how data is used.
 We will work together to identify common challenges and recognise data as a key ingredient to solutions.
 Decision-making will improve as the organisation shifts to recognising the value of data-informed, intelligence-led, decisions.
 Everyone will be empowered to speak up if they see an opportunity to improve data quality, service delivery, or citizen outcomes by using
data differently.
 Employee engagement will increase as staff perspectives on data are respected and their suggestions for using data to innovate recognised.
 Employee satisfaction and retention will increase as those with responsibility for data in their teams will feel less isolated and more valued as
a member of a broad, supportive data community within and beyond the organisation. 
WHAT WHY WHO BY WHEN
The Data Advisory Group (DAG) will seek to
encourage attendance and participation from more
service representatives.
One sign of a strong data culture is the fruitful
conversations that happen within the organisation
and the extent to which those conversations cross
service boundaries.  As the council’s “data forum”
the DAG will seek not only to encourage such
conversations but also translate emerging themes
into actions for change.
Data Advisory Group 
Data Programme 
All Services
All services
having at least
one nominated
representative
on the DAG: 
July 2024
The Data Technical Group (DTG) will democratise
access to the council’s data resources, including
PowerBI and the data platform.  Anyone with an
interest in using these tools for their service’s
priorities will be encouraged to participate in a DTG
sub-group where the sub-group has been tasked
with the evaluation and delivery of a data product
from the DAG’s roadmap relating to their service.
Services don’t rely on others to build Excel
spreadsheets for them, and the aim is for services
to become similarly self-sufficient with PowerBI. 
As well as involving skills development this self-
sufficiency will require hands-on experience.  The
DTG sub-groups will share opportunities to gain
this experience while also allowing staff to
contribute their personal expertise.
Data Technical Group 
Data Programme 
All Services
All services
having had at
least two
representatives
on data product
DTG sub-groups: 
December 2025
The Data Culture will be extended beyond the
council with officers encouraged to engage with
relevant external partners.  DAG will have at least
two presentations per year by external partners with
data expertise to share.
Ideas for impactful innovation can come from
many sources, including through ideas exchange
with external parties on concepts which have been
shown to have worked elsewhere.
Data Advisory Group 
All Services
December 2024
December 2025
December 2026 
December 2027 
December 2028
Page 255

Page 256

Data Strategy & Action Plan: 2024-2028
Page 10 of 19 
Processes Supporting SERVICE TRANSFORMATION
What success will look like:
 The principles of the Scottish Approach to Service Design will be enabled by, amongst other things, having access to relevant data on user
needs and service demand both now and projected into the future.
 Collection and analysis of data about our service users and their needs will be enabled, both by easier access to survey response data, and
through relevant administrative data collected by the council and other public sector agencies.
 Analysis of actual service usage data will allow us to recognise and address common pressure points which present persistent challenges for
effective service delivery.
 Data-driven service transformation will lead to greater consistency across the council’s change programme, where business intelligence
provides for a coherent approach toward the objectives of business process change.
 We will see expansion from the day-to-day operational uses of data, to the more complex analytical use of data for making evidence-led
decisions to support optimised service design and delivery. 
WHAT WHY WHO BY WHEN
The Data Advisory Group (DAG) will encourage
engagement from any service contemplating service
transformation or other specific business process
change exercise.  
The DAG will support services to increase the
likelihood of successful service transformation,
but the drive for change must come from the
services themselves.  With clearly outlined
objectives from the service the DAG and data
programme can then engage with the service to
bring data skills and resources to bear.
Data Advisory Group 
Data Programme 
All Services
Ongoing
The Data Programme will work with HROD to establish
and maintain a reference archive of case studies where
council services have conducted service transformation
exercises, detailing how data was used as a key
ingredient for success in the transformation.
Common themes often emerge from service
transformation exercises: stakeholder
engagement, risk mitigation, cost/benefit
projections, etc.  
Data Programme 
HROD
August 2024
The Data Programme will provide an annual report to
the DAG summarising service transformations which
concluded in the preceding year where data provided a
critical ingredient for the planning and/or successful
delivery of the transformation.
By sharing learning from past successes, and
challenges, each new transformation exercise
builds on the strengths of those before.
Data Advisory Group 
Data Programme 
All Services
April 2024
April 2025
April 2026 
April 2027 
April 2028  
Page 256

Page 257

Data Strategy & Action Plan: 2024-2028
Page 11 of 19 
Processes Embedding good DATA GOVERNANCE
What success will look like:
 Data quality, reliability and overall decision-making will be improved with less risk of decisions being taken based on a false
representation/understanding of the situation on the ground.
 We will have greater confidence in the council’s legal and regulatory compliance through a better understanding of how data is being stored
and used.
 Everyone will have a clearer understanding of how decisions are taken to use, re-use and share data, both internally and with partners.  This
will lead to more opportunities being taken to share and re-use data, with protocols in place to do so in a secure and compliant manner.
 Agreed processes and procedures for the storage and handling of data will be adhered to, including a robust and consistent approach to data
standards and the ethical use of data. 
WHAT WHY WHO BY WHEN
The Data Advisory Group will be represented on the
council’s new Information Management Steering Group
(IMSG).  Although the IMSG has no governance role
over the DAG, both groups have a common interest in
good data governance, and so the DAG may sometimes
escalate issues arising with data to the IMSG.
Decisions made by the Data Advisory Group and
the Information Management Steering Group
will be mutually impactful in the context of data
storage, processing and handling and as such
will be taken in concert with each other to
achieve optimal outcomes for the council.
Data Advisory Group,
IM Steering Group,
Data Programme
February 2024
The design and implementation of data products
approved by the Data Advisory Group will be subject to
robust data governance review by the Data Technical
Group, with representation and expertise from the
Legal & Regulatory team where necessary.
While the focus of the DAG will be on using data
to meet the strategic objectives of the council,
the DTG sub-groups will have clearer sight on
the specific data sources required to build the
products and so better able to scope the data
governance implications of (re)using the data.
Data Technical Group 
Legal & Regulatory
Ongoing
Where the DTG discovers development of a data
product approved by the DAG would be blocked,
delayed, or constrained by data quality or reliability
issues, these issues will be escalated to the DAG for
review.  The DAG may in turn escalate them for the
attention of the IMSG.  The DAG will receive an annual
report of issues escalated to the IMSG with a summary
of their current status.
In many cases issues with a dataset will have
been encountered before and be known to the
service.  By raising such issues with the IM
Steering Group a decision can be taken on
whether devoting resources to fix/resolve the
issue is justified, or it’s more prudent to defer a
solution and absorb the opportunity cost to the
council of not being able to fully utilise the data.
Data Advisory Group,
IM Steering Group,
Data Programme
April 2024
April 2025
April 2026 
April 2027 
April 2028
Page 257

Page 258

Data Strategy & Action Plan: 2024-2028
Page 12 of 19 
Processes Supporting WORKFLOW & PROCESS AUTOMATION
What success will look like:
 Increased employee satisfaction as task automation will allow reallocation of staff time away from repetitive data input, collation of routine
returns, etc., to other more interesting and rewarding activities.
 Business processes which are automated will see reduced incidence of errors and increased efficiency.  This will include robust design and testing
to ensure errors don’t become “baked in” to automated processes from the outset.
 Increased productivity, where staff able to leverage automated workflow tools will find they can process a larger number of cases/activities in the
same amount of time.
 For service users, their experience of an automated workflow will often be faster and more consistent. 
WHAT WHY WHO BY WHEN
Services will be encouraged to bring to the Data
Advisory Group (DAG) use-case proposals where the
service has identified opportunities for workflow and
process automation.
Services will know where existing processes are
highly repetitive and/or labour intensive.  By
bringing use-cases to the DAG forum there can be
discussion amongst the DAG’s service and
technology specialists of possible solutions.
Data Advisory Group 
All Services
On-going
Potential use-cases for implementing workflow and
process automation can be treated as special cases of
the data challenge proposals which the DAG reviews.  
A variation of the existing data challenge proposal
submission process will be agreed and adopted.
As with potential PowerBI reports, the potential
effort and impact of use-cases for workflow and
process automation will vary.  That said, the
proposal process must reflect the considerations
for DAG to evaluate are similar but different.
Data Advisory Group,
Data Programme,
ICT Apps Team,
Digital Team
April 2024
The Data Programme will establish and maintain a
reference archive of case studies where council
services have successfully implemented workflow and
process automation projects, and how data was used
as a key ingredient for success in each.
By sharing learning from services’ successful
implementations of workflow and process
automation, each new implementation builds on
the strengths of those which came before.
Data Programme August 2024
Services will be made aware of the broad and evolving
toolkit to which the council has access for
implementing workflow and process automation. 
DAG will receive at least two presentations per year
on the opportunities offered by, and recent successes
of, the workflow and process automation toolkit.
By increasing awareness of tools such as
Microsoft PowerAutomate, Create-RPA (Robotic
Process Automation) and similar tools which
become available over the coming years, services
will be better able to recognise opportunities for
bringing use-cases to the DAG for consideration.
Data Advisory Group 
Data Programme
December 2024 
December 2025 
December 2026 
December 2027 
December 2028
Page 258

Page 259

Data Strategy & Action Plan: 2024-2028
Page 13 of 19 
Processes Shifting from reactive to PROACTIVE SERVICE DELIVERY
What success will look like:
 More of the council’s resources will be focussed on activities that have a proactive, pre-emptive rather than reactive, impact.
 A positive impact on council budgets will come from more focus on preventative maintenance and interventions rather than more costly,
after-the-event, responses.
 Services will be offered to our citizens and communities closer to the time when they need them, rather than after an adverse event or crisis
has already occurred.
 Greater customer satisfaction will stem from a more citizen-centric approach, with a larger proportion of customer interactions relating to
requirements being met rather than missed.
WHAT WHY WHO BY WHEN
Council services will be encouraged to identify
situations in which the focus of some aspects of their
service delivery can be shifted to a more proactive
approach.  These will be packaged for review by the
Data Advisory Group as data challenge proposals for
prioritisation and resourcing.
Services themselves best understand how
resources are spent on service delivery, and
where there are the best opportunities to shift
focus to “upstream” activities to improve service
delivery and outcomes.
All Services 
Data Advisory Group
On-going
Making more data available to council services about
service demand and service delivery; data upon which
predictions can be made both at a high level and
where possible for specific service users.
A proactive approach to service delivery relies on
being able to anticipate events, which in turn
relies on trend analysis and recognising patterns
in past events which may be repeating in real
time, both at service level and in the needs and
circumstances of individual service users.  
Data Programme 
(See themes on the 
“data platform” and 
“data tools” below.)
On-going
Working with partners nationally (e.g. Improvement
Service, PHS, other councils, academia, the private
sector, etc.) to explore opportunities to adopt
predictive models locally which have been proven to
be impactful.  The Data Programme will provide an
annual report to the DAG summarising pro-active
service delivery use-cases which concluded in the
preceding year, acknowledging third-party
involvement where relevant.
As a local authority we have limited resources but
also face challenges which are shared by other
councils.  We will make more progress in
transitioning from reactive to predictive service
delivery if we seek opportunities to learn from
the success of others and then share those
successes internally.
Data Programme 
Data Advisory Group
April 2024
April 2025
April 2026 
April 2027 
April 2028  
Page 259

Page 260

Data Strategy & Action Plan: 2024-2028
Page 14 of 19 
Processes Maximising council PERFORMANCE & RESOURCE PRIORITISATION
What success will look like:
 We will be able to proactively use and scrutinise past performance data to improve future performance.
 We will be able to bring performance datasets together and enable linkages to be made across a range of factors affecting performance.
 We will be able to comply with Statutory Performance Information (SPI) Direction requirements.
 Enhanced performance data will be used to identify demands and opportunities to focus council resources on objectives which improve
performance and service outcomes in key areas.
 Stakeholders inside and outside of the council will obtain greater value from performance reporting arrangements, e.g. where the council’s
enhanced data architecture allows for more timely or frequent performance reporting. 
WHAT WHY WHO BY WHEN
Aligning with the Performance Excellence Project
(PEP), identify new ways to provide performance data. 
There will be focus throughout on accuracy,
consistency of template style, accessibility, and
satisfying the requirements of the stakeholders who
use the performance data.
PowerBI and the data platform will provide new,
more effective, options for collating and
distributing performance data.  The PEP will
define the “what” and “why” of performance
reporting while the Data Programme will provide
the technical support and infrastructure to help
deliver on the PEP’s objectives.
Performance Excellence
Project 
Data Programme
August 2024
Transition from performance data collection via Excel
spreadsheets to a more robust data collection
framework based on data interoperability between
the council’s line-of-business systems and the data
platform.  This may in turn lead to opportunities to
increase the frequency of some performance
reporting.
Once established, the data platform will be the
optimum data source for PowerBI reports.
Transitioning performance reports from Excel to
the data platform collecting data directly from
relevant line-of-business systems will reduce the
burden of performance reporting and potentially
increase the timeliness of reporting.
Performance Excellence
Project 
Data Programme 
ICT Apps Team 
December 2025
Transition from current retrospective reporting
against targets to more forward-looking actionable
intelligence and analytics.
Reporting of past performance is useful up to a
point, but to obtain actionable insight for
bringing about change we need to be able to
analyse patterns and trends so as to influence
future performance. 
Performance Excellence
Project 
Data Programme
December 2025  
Page 260

Page 261

Data Strategy & Action Plan: 2024-2028
Page 15 of 19 
Processes Broadening OPEN DATA Sharing
What success will look like:
 Members of the public and other interested parties will be able to access specific council open data and information via the council website.
 Time spent by council staff answering questions and responding to information requests will be reduced by channelling more of these
enquiries to the open data published on the website.
 Open data and information on the council website will be published and updated with a high degree of accuracy and minimal administrative
effort through largely automated data extraction and processing directly from line-of-business systems with robust data quality checks.
 Our published open data inventory will compare favourably to the breadth and currency of the open data offered by other Scottish local
authorities of similar size.
WHAT WHY WHO BY WHEN
Identify the types of data and information requests
which are most frequent and/or which take the most
staff effort to answer/fulfil.
A key benefit of publishing open data is to
reduce the burden on council staff to respond
to incoming information requests.
Data Advisory Group March 2024
Benchmark the open data published by other Scottish
local authorities.
Learning from other councils who have derived
benefit from publishing specific open data.
Data Programme May 2024
Create a prioritised list of the target additional open
datasets to be published on the council website.  Taking
into account the relative ease/complexity of
automating the data collection, approval process, etc.
Aiming to find the optimal balance between
targeting datasets for which there will be a clear
demand, while also relatively easy to publish in
a fully or largely automated manner.
Data Advisory Group 
Data Programme
July 2024
Proof of concept: leveraging the new Data Platform,
publish one new open dataset on the council’s website,
to establish the robustness of the automated data
collection, quality checks and approval process.
Aiming to establish a start-to-finish process for
publishing the first open dataset which, if
shown to be successful, can be repeated for
subsequent target datasets.
ICT Apps team 
and the relevant Service
(to which the 
data belongs)
September 2024
Achieve 50% of the open datasets from the target list
being published.  Measuring public access and avoided
manual staff effort to handle diverted enquiries.
A key milestone, although timing may shift if
the target inventory of in-demand open
datasets grows/changes over time.
ICT Apps team and
relevant Services
April 2026
Achieve 80% of the open datasets from the target list
being published.  Measuring public access and avoided
manual staff effort to handle diverted enquiries.
The final 20% likely left to last because those
have minimal benefit from publishing and/or
would be the most difficult to automate.
ICT Apps team and
relevant Services
April 2028
Refresh the annual benchmarking exercise against open
data published by other Scottish local authorities of a
similar size.
So as to ensure maintenance of comparable
status within that group of local authorities and
provide equivalent value to our stakeholders. 
Data Programme Annually from
May 2025 
Page 261

Page 262

Data Strategy & Action Plan: 2024-2028
Page 16 of 19 
Technology Delivering the DATA PLATFORM & Related Architecture
What success will look like:
 Services wanting to solve challenges with data will have access to a corporate resource in the data platform which makes it easier for them to
combine their own data with datasets shared by other council services and brought in from trusted external bodies/partners.
 Services wanting to use the enhanced reporting and analysis features of PowerBI but having had limited experience using it will be able to rely
on some of the more complex data cleaning, modelling and transformation tasks being done for them within the data platform, making their
task of creating the PowerBI reports simpler.
 Staff will become less dependent on pulling data out of line-of-business systems into Excel for purpose of processing and manipulating data
(e.g. for repetitive returns) as the data collation and processing will happen on a fully or largely automated basis within the data platform.
 Overall accuracy and reliability of the council’s data will increase as quality control processes become embedded into the data platform
workflows and will alert data owners when discrepancies in data are found automatically.
WHAT WHY WHO BY WHEN
Designing and implementing the target data model (a
logical structure for organising and finding data) to be
embedded in the data platform.
This is a representation of the “things” within
the council’s data (people, places, assets, etc.)
and is essential for building data products.
Data Programme, 
ICT Apps
February 2024
Designing and implementing the robust
access/permissions model to be embedded in the data
platform.
The data platform must simultaneously keep
the council’s data secure while also making it
easy for service staff to share and access.
IM Steering Group, 
ICT Apps
February 2024
Designing and implementing the “data mart”, that is the
part of the data platform which report builders in the
services can see to pull data into their PowerBI reports.
The data platform cannot be entirely
transparent, i.e. data owners in each service will
choose how much or how little of their data to
share via the data mart, and with whom. 
Data Programme, 
ICT Apps
March 2024
Linking the data platform to council line-of-business
systems through a shared data architecture.  This will
be done on an as-needed basis as and when the DAG
approves specific service data challenge proposals.
The aim is to have data arrive and update in the
data platform with little or no manual effort.
But the “pipes” through which data arrives
must be implemented system-by-system.
Data Advisory Group,
Data Technical Group,
ICT Apps
March 2024
Update of the business case for shifting the data
platform from “on premise” to “cloud” hosting. There
are features of Microsoft’s “data fabric” cloud products
which are recognised as potentially useful, if the
significant revenue costs can be justified.
Costs associated with Microsoft “data fabric”
are significant and the cost/benefit business
case was not proven in the September 2022
business case.  Evidence to justify the shift will
be reviewed and the business case updated. 
Data Programme, 
ICT Apps
August 2025
Page 262

Page 263

Data Strategy & Action Plan: 2024-2028
Page 17 of 19 
Technology Enabling the adoption of POWERBI, AI and other data tools.
What success will look like:
 Services will use reports built in PowerBI to monitor operational data in near real-time, so as to be able to intervene in situations where
service delivery metrics are outside of expected tolerances.
 Services will use data analysed and presented in PowerBI to better understand service demand and stress factors affecting service delivery.
 Reports traditionally produced monthly or quarterly will be shifting to more frequent reporting as PowerBI reports, leveraging the data
platform and associated data architecture, will be able to update more frequently with little or no additional administrative effort.
 Services will use more advanced features of PowerBI, such as trend analysis and AI (artificial intelligence) “co-pilot” for plain-English queries to
ask questions of data which would previously have been impossible to answer using Microsoft Excel alone.
 The council will maximise its use of Sharepoint Online to make compliance with retention and disposal policies more effective.
 The council will be able to more powerfully lobby the Scottish Government and others by using PowerBI to tell more effective stories with data
using maps and other visualisations.
WHAT WHY WHO BY WHEN
Services will be encouraged to bring to the Data
Advisory Group (DAG) data challenge proposals where
the service has identified opportunities for PowerBI,
data analytics, or AI to make a positive, impactful
difference to service delivery and outcomes.
By bringing data challenges to the DAG forum
there can be an informed discussion amongst
the DAG’s service and technology specialists of
possible solutions.  The DAG can help determine
prioritisation and allocation of resource,
including any software licenses when required.
Data Advisory Group 
All Services
Ongoing
The Data Programme will establish and maintain a
reference archive accessible to all services of case
studies where council services have successfully
implemented PowerBI, AI or other tools.
Common themes often emerge from
technology projects: risk mitigation,
cost/benefit projections, etc.  By sharing
learning from past successes each new data
product development builds on the strengths of
those which came before.
Data Programme March 2024
The Data Programme will present to the Data Advisory
Group, at least twice per year, updates on potential
uses of emerging technologies such as AI, Large-
language Models, Microsoft Co-pilot, etc.
Opportunities for the council to use new data-
driven technologies are constantly emerging
but require critical, realistic evaluation and risk
assessment and cost/benefit analysis.
Data Advisory Group 
Data Programme
December 2024
December 2025
December 2026 
December 2027 
December 2028
Page 263

Page 264

Data Strategy & Action Plan: 2024-2028
Page 18 of 19 
Technology Factoring DATA FEATURES into line-of-business systems
What success will look like:
 While keeping our data secure, our systems will also make it easier, not harder, to harness our data to for reporting and analysis.
 Our systems will allow for interoperability, i.e. systems can exchange data and use common identifiers, such as Unique Property Reference
Numbers, which make combining and sharing data between systems easier.
 Our systems will allow for recognised local government and statutory data standards to be applied consistently.
 Our systems will allow for portability of our data, i.e. when we change solution supplier for a given system we won’t face unreasonable
hurdles to moving our data to the new system.
WHAT WHY WHO BY WHEN
When data products, e.g. new reports, on the data
programme product roadmap are blocked, or have their
functionality curtailed due to feature limitations of a
line-of-business system, this will trigger a dialogue with
the supplier to try and resolve the constraint.
When the Data Advisory Group has tasked the
Data Technical Group with building a specific
data product, e.g. a PowerBI report, the success
of the product will often depend on its ability to
access data held in line-of-business systems.  
Data Advisory Group
Data Technical Group
ICT
Ongoing
Create a standard set of procurement requirements for
when systems are being implemented or replaced that
reflect the organisation’s need for rich data capabilities
such as support for APIs (application programming
interfaces), query/reporting tools for data extraction,
and interoperability with the council’s data platform.
Such standardised requirements will ensure:
 our requirements for compliance with
accepted local government and statutory
data standards are met,
 our requirements for interoperability and
data extraction are met.
Data Programme 
ICT
June 2024
Engage with system suppliers in their ongoing
development of business applications to encourage
richer data capabilities in their product roadmaps. 
Engagement will be directly through customer user
groups as well as through national bodies such as
SOCITM and Scotland Excel.  The Data Programme will
provide an annual report to the DAG summarising
engagement with suppliers in the preceding year, with
an indication of the outcome and/or current status of
each.
Software suppliers operate in a competitive
market. Since most of our expectations of their
products are similar to those of other local
authorities, collectively we have a better chance
of getting fit-for-purpose systems if we press
suppliers to continually improve their offerings.
For example, requiring systems that support
near realtime connections from PowerBI and/or
the council’s data platform, use of RPA (robotic
process automation) agents, etc.
Data Programme 
ICT
April 2024
April 2025
April 2026 
April 2027 
April 2028 
Page 264

Page 265

Data Strategy & Action Plan: 2024-2028
Page 19 of 19 
Page 265

Page 266

This page is intentionally left blank

Page 267

1 
ARGYLL AND BUTE COUNCIL            POLICY AND RESOURCES COMMITTEE       
COMMERCIAL SERVICES                                 15th AUGUST 2024 
COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 – UPDATE – EXPRESSIONS
OF INTEREST / ASSET TRANSFER REQUESTS / PARTICIPATION REQUESTS /
REPORTING REQUIREMENTS 
1. EXECUTIVE SUMMARY 
1.1  The purpose of this report is to advise the Policy and Resources Committee on: 
• The operation of the processes in regard to formal Asset Transfer Requests
(ATR) and Participation Requests in terms of the Community Empowerment
(Scotland) Act 2015;
• Current live informal Expressions of Interest (EOI’s) which may become
subject to a formal asset transfer request or be dealt with outwith the formal
asset transfer request process;
• Current live ongoing or agreed Participation Requests received by the Council;
and
• The annual reporting requirements in respect of Asset Transfer Requests and
Participation Requests set out in Section 95 and 32 of the Community
Empowerment (Scotland) Act 2015 respectively. 
1.2 At the Elected Members seminar on 21st March 2023 it was agreed that updates on
ATRs and EOIs would be provided on a regular basis. Accordingly, this report will be
circulated to all Members following the committee and a quarterly update is provided
directly to all Members between the annual reporting. 
RECOMMENDATIONS 
1.3 It is recommended that: 
1.3.1 The Policy and Resources Committee consider the report. 
Page 267 Agenda Item 14

Page 268

2 
ARGYLL AND BUTE COUNCIL            POLICY AND RESOURCES COMMITTEE 
COMMERCIAL SERVICES                                 15th AUGUST 2024 
COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 – UPDATE – EXPRESSIONS
OF INTEREST / ASSET TRANSFER REQUESTS / PARTICIPATION REQUESTS /
REPORTING REQUIREMENTS 
2. INTRODUCTION
2.1 The purpose of this report is to advise the Policy and Resources Committee on: 
• The operation of the processes in regard to formal Asset Transfer Requests
and Participation Requests in terms of the Community Empowerment
(Scotland) Act 2015;
• Current live informal Expressions of Interest (EOI’s) which may become
subject to a formal asset transfer request or be dealt with outwith the formal
asset transfer request process;
• Current live ongoing or agreed Participation Requests received by the Council;
and
• The annual reporting requirements in respect of Asset Transfer Requests and
Participation Requests set out in Section 95 and 32 of the Community
Empowerment (Scotland) Act 2015 respectively. 
2.2 At the Elected Members seminar on 21st March 2023 it was agreed that updates on
ATRs and EOIs would be provided on a regular basis. Accordingly, this report will
be circulated to all Members following the committee and a quarterly update is
provided directly to all Members between the annual reporting. 
3. RECOMMENDATIONS
3.1 It is recommended that: 
3.1.1 The Policy and Resources Committee consider the report. 
4. DETAIL
4.1      The Council operates processes in compliance with parts 3 and 5 of the Community
Empowerment (Scotland) Act 2015 in regard to: 
• Asset Transfer Requests (ATR’s) (part 5 of the Act) which came into force on 23
January 2017.   ATR’s enable community bodies to make requests to all local
authorities, Scottish Ministers and a range of public bodies for any land or
buildings they feel they could make better use of. They can request ownership,
lease or other rights as they wish.
Page 268

Page 269

3 
• Participation Requests (Part 3 of the Act) which came in to force on 1 April 2017.
These are requests to public bodies which, if granted, enable communities to
participate in decisions and processes which are aimed at improving outcomes. 
EXPRESSIONS OF INTEREST (EOIs)
4.2 There were twenty (20) active Expressions of Interest (EOIs) (as at 5th June 2024)
and these EOI’s are listed in Appendix 1. Since the update report in August 2023, 5
EOI’s have been received. To date, since January 2017, 88 EOIs have been received
of which 68 have been resolved or withdrawn. It should be noted that the Council has
continued to engage with community groups who have had EOI’s active for a
significant period of time and while they remain active the requesters have not yet
moved them on. There are currently no significant actions outstanding for the Council
in relation to these. 
4.3 Further, most EOIs would not progress or develop into a formal asset transfer
request. EOIs are dealt with in a way that seeks to deliver the outcome required by
the community group allowing the request to progress outwith the formal asset
transfer process. Some EOIs are also withdrawn for a variety of reasons such as the
group changing focus of what was needed, a better option becoming available or a
lack of time and resources to progress their plans. 
ASSET TRANSFER REQUESTS
4.4 The Council has put in place information, advice and guidance to community bodies
who are interested in making a formal ATR and further information on this can be
found on the Council’s website at 
https://www.argyll-bute.gov.uk/my-community/communities-and-partnerships/community-asset-
transfer/asset-transfer-expressions. 
There have been 3 ATRs submitted following the implementation of the Act and as at
5th June 2024 there were no active ATRs. 
PARTICIPATION REQUESTS 
4.5 Part 3 of the Community Empowerment (Scotland) Act 2015 provides a framework
for the use of participation requests by community bodies, with the intention of
enabling communities to have more influence over services and decisions which
affect them. Part 3 of the Act came into force on the 1st April 2017. 
4.6 In line with the requirements of the Act, the Council has put in place a procedure
which allows consideration of any requests made by community bodies. The
procedure and further information can be found on the Council’s website at
https://www.argyll-bute.gov.uk/my-community/communities-and-partnerships/find-out-more-
about-participation-requests 
4.7 During the period 1 April 2023 to 31 March 2024, the Council received 2 participation
requests. 
Page 269

Page 270

4 
ASSET TRANSFER AND PARTICIPATION REQUESTS - ANNUAL REPORTING
REQUIREMENTS 
4.8 Section 95 of the Community Empowerment (Scotland) Act 2015 requires the
Council to publish an annual report setting out the numbers of asset transfer
requests received and their outcomes. 
4.9 The report also requires to set out what the Council has done to 1: promote the use
of asset transfer requests and 2: support community bodies to make requests and
can be found on the Council’s asset transfer webpages here: 
https://www.argyll-bute.gov.uk/my-community/communities-and-partnerships/community-asset-
transfer 
https://www.argyll-bute.gov.uk/asset-transfer-support 
4.10 Annual reports cover each year from 1 April to 31 March and must be published by
30 June. 
4.11 Section 32 of the Act also requires the Council to publish an annual report in respect of
Participation Requests setting out: 
• The number of requests received;
• The number of requests agreed and refused;
• The number of requests which resulted in changes to a public service provided by,
or on behalf of, the public service authority; and
• Any action taken by the public service authority to promote and support the use of
participation requests. 
4.12 Annual reports Participation Requests cover each year from 1 April to 31 March and
must be published by 30 June. The relevant report has been published on the website
https://www.argyll-bute.gov.uk/my-community/communities-and-partnerships/participation-
requests-annual-reports 
5. CONCLUSION
5.1 This report advises the Policy and Resources Committee on the operation, of the
processes in regard to Asset Transfer Requests and Participation Requests in terms of
the Community Empowerment Act 2015 and updates on ATR’s, EOI’s and Participation
Requests to date. 
5.2 It is recommended that the Policy and Resources Committee consider the contents
of the report.  
6.  IMPLICATIONS
6.1 Policy – In line with council policy relating to Asset Transfer and Participation
Request processes.
6.2 Financial – None from annual reporting.
6.3 Legal – In line with statutory requirements of the Community Empowerment
(Scotland) Act 2015 and related Regulations.
Page 270

Page 271

5 
6.4 HR – None.
6.5 Fairer Scotland Duty 
6.5.1 Equalities – Protected characteristics – None.
6.5.2 Socio economic Duty – None.
6.5.3 Islands – None from annual reporting.
6.6 Climate change – None from annual reporting.
6.7 Risk – Failure to meet statutory requirements could have reputational
implications for the council. 
6.8 Customer Service – None.
6.9 The Rights of the Child (UNCRC) – None from annual reporting.
Douglas Hendry - Executive Director with responsibility for Commercial Services
Councillor Ross Moreland – Policy Lead, Finance and Commercial Services
Date: 5th July 2024 
For further information contact: 
Ross McLaughlin, Head of Commercial Services, 01436 658 914
David Allan, Estates and Property Development Manager, 01436 657 620
David Rennie, Partnerships Development Officer, 01700 501 371 
Page 271

Page 272

6 
Appendix 1 
Current Active Expressions of Interest (as at 5th June 2024) 
It should be noted that the Council has continued to engage with community groups who
have had EOI’s active for a significant period of time and while they remain active the
requesters have not yet moved them on. 
No Organisation Asset Summary of Expression
of Interest
Current Status
1 Mid Argyll
Rugby Club
(MARC)
Kilmory Pony
Park show
ground
Request to lease the
ground for development of
rugby facilities.
Terms agreed with MARC
and approved. Vacant
possession required prior to
conclusion of lease and
interim option at Ropework
Park is progressing.
2 South Islay
Development
Ramsay Hall Request to lease the
building to redevelop the
facility and operate the
services.
Group are pulling together a
funding package to develop
the asset.
3 Rhu and
Shandon
Community
Centre
Rhu
Community
Centre
Request for lease to assist
in applying for
development funding for
the building
Terms are under discussion
but the approach requires to
be consistent with other
halls / community facilities.
Support is being provided to
the group.
4 Kilfinan
Community
Forest
Company
(KCFC)
Tighnabruaic
h Primary
School
Grazings
access
Request to acquire ground
to formalise access.
Group assisted to secure an
independent valuation and
are applying to the Land
Fund to support the
acquisition of the ground.
Land Fund application has
been submitted awaiting
results.
5 The Dunoon
Project Ltd
Morag’s Fairy
Glen &
Bishop’s
Glen, Dunoon
Request to acquire the
sites to support the
delivery of the wider
project and improve the
public access and facilities.
Initial investigations
completed and awaiting
further feedback from the
group. Significant project
which will take time to
develop.
6  Ardrishaig
King George
V Community
Park
Association 
King George
V Park,
Ardrishaig
Request to develop the
facilities and maintenance
arrangements of the park
Group are being supported
to develop their request.
7 Dunoon
Youth
Football
League
Black Park,
Dunoon
Request to bring back into
use the green football pitch
on the Black Park site
working in partnership with
the Council and Live Argyll 
Initial licence to reopen
changing rooms concluded.
Group are developing
proposals for next phase of
project.
Page 272

Page 273

7 
8 Dunoon Pipe
Band
Dunoon Pipe
Band Hall,
Dunoon
Request for a new lease of
the hall.
Group are being supported
to develop their request.
9 Princess
Louise Hall
Committee
Princess
Louise Hall &
Howie
Pavilion,
Rosneath
Request for new lease of
hall and pavilion
Terms agreed and
approved. Legal Services
progressing towards
concluding lease.
10 Jura
Development
Trust
Jura Roads
Yard,
Craighouse
Pier, Isle of
Jura
Request to acquire yard to
expand the group’s
adjacent business.
Depot is required
operationally so would
require an alternative
location if closed. Group
seeking alternative
locations.
11 Oban Lorne
RFC
Glencruitten
playing fields,
Oban
Request to lease / acquire
playing fields and
clubhouse and to develop
new facilities
Terms agreed and
approved. Legal Services
progressing towards
concluding lease
12 Lismore
Community
Trust
Lismore Pier,
Isle of
Lismore
Request to acquire pier
facilities and public toilets
Group are working on a
number of projects and are
being supported to develop
their request.
13 Isle of Bute
Seasports
Club
Seasports
club house /
store.
Request for new lease of
site and clubhouse 
Terms are being discussed
prior to seeking internal
approval to proceed.
14 Balemartine
Community
Garden
Association
Balemartine
Schoolhouse
Playing field
Request to develop vacant
site into Community
Garden for local residents
and children’s play area
Group are being supported
with request, which has
developed slowly. Site also
being considered for
housing development but
may accommodate both
uses.
15 Argyll and the
Isles Coast
and
Countryside
Trust
Land
adjacent to
Kilmory
Castle car
park
Request to relocate their
base of operations into the
Kilmory Estate
ACT office base in Kilmory
now concluded. Discussions
on woodland hub are
progressing.
16 Port
Bannatyne
Community
Garden
Port
Bannatyne
community
garden
Request for Licence to
undertake gardening and
environmental
improvement programmes
Terms are being discussed
prior to seeking internal
approval to proceed.
17 West Kintyre
Community
Council
Tayinloan
Ferry public
convenience
Request to acquire public
convenience to allow
demolition and
development of new
facilities
Land ownership is being
confirmed and terms are
being discussed prior to
seeking internal approval to
proceed.
18 Luing
Development
Trust
Land at
Fladda, Luing
Request to acquire ground
for the development of
affordable homes for
residents and workers
Land ownership is being
confirmed and terms are
being discussed prior to
seeking internal approval to
proceed.
Page 273

Page 274

8 
19 Helensburgh
Pier
Company
Helensburgh
Pier
Request for a 50 year
lease of pier to allow a
phased redevelopment
Land ownership is being
confirmed and terms are
being discussed prior to
seeking internal approval to
proceed.
20 Avich &
Kilchrenan
Community
Heritables
Kilchrenan
Primary
School
Request to acquire school
to develop as a community
hub
Schools consultation
process will not end until
November 2024 after which
request can progress. 
Page 274

Page 275

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE
CLIMATE CHANGE BOARD         15TH August 2024 
COUNCIL CARBON EMISSIONS 2022/2023 
1.0 EXECUTIVE SUMMARY 
1.0 Scotland has some of the most ambitious targets and progressive
legislation in terms of climate change in the world. Public sector bodies,
including Councils, will play a key role in meeting the Scottish
Government’s 2045 Net Zero target and have statutory climate change
duties under the Climate Change (Scotland) Act 2009 to: Cut
greenhouse gas emissions, prepare for the impacts of climate change,
and act sustainably. The most recent results from the Public Bodies
Climate Change Duties Report for the financial year 2022/23 are now
available online, and have been published in the Sustainable Scotland
Network’s ‘Summary Analysis’ report in May 2024. 
1.1 188 public bodies, including Local Authorities, NHS Boards, Educational
Institutions, Transport Partnerships, and Integration Joint Boards across
Scotland have reported via the 2022/23 Public Bodies Climate Change
Duties. These reports include information on corporate emissions,
projects, renewables, emission targets, and climate adaptation action.
Total emissions reported in 2022/23 in Scotland via the Public Bodies
Climate Change Duties Report is 2,786,823 tCO2e. 
1.2 Argyll and Bute Council has reported a 6% decrease in its carbon
emissions in 2022/23. The Council’s carbon footprint reduced by 1,705
tCO2e, from 28,217 tCO2e in 2021/22 to 26,512 tCO2e in 2022/23. Since
the Council commenced reporting in 2015/16, there has been an overall
32.8% reduction in emissions. Further examination of figures shows that
decreases across Scope 1, 2 and 3 emission sources have been
achieved by the Council in the 2022/23 reporting period. 
1.3 The Council’s key climate change document is the Decarbonisation Plan,
which was adopted in December 2021, confirming the Council’s
commitment to achieving net zero emissions by 2045, in line with the
Scottish Government’s target. 
Page 275 Agenda Item 15

Page 276

2.0  RECOMMENDATIONS
That the Policy and Resources Committee are asked to consider:
2.1 The publication of the Council’s 2022/23 Public Bodies Climate Change
Duties report, confirming a 6% decrease in emissions reported for the
year. The Council’s carbon footprint reduced by 1,705 tCO2e, from
28,217 tCO2e in 2021/22 to 26,512 tCO2e in 2022/23; and
2.2 the Full Decarbonisation Tracker update attached at Appendix A. 
Page 276

Page 277

ARGYLL AND BUTE COUNCIL   POLICY & RESOURCES COMMITTEE 
CLIMATE CHANGE BOARD         15th August 2024 
COUNCIL CARBON EMISSIONS 2022/2023 
3.0 INTRODUCTION 
3.1 The ‘Climate Change (Duties of Public Bodies; Reporting Requirements)
(Scotland) Order 2015’ as amended by the Climate Change (Duties of Public
Bodies: Reporting Requirements) (Scotland) Amendment Order 2020, requires
public bodies to report annually on compliance with climate change duties.
Mandatory reporting began in 2015/16. Argyll and Bute Council is one of these
organisations required to publish annual emissions data. The most recent
Public Bodies Climate Change Duties Report is now available on the
Sustainable Scotland Network website, along with the 2022/23 ‘Summary
Analysis’ report published in May 2024.
3.2 It is important to note that the Public Bodies Climate Change Duties Report
records the corporate emissions of the Council, and does not reflect regional
territorial emissions. The Argyll and Bute Community Planning Partnership is
responsible for progressing the regional Climate Action Strategy.
3.3 The Climate Change Board reports progress to the Policy and Resources
Committee on a regular basis. This report outlines overarching activities of the
Climate Change Board to the Council, providing a snapshot of key contributors to
Council emissions, progress and areas for improvement. The Council’s work on
climate change continues to align with the Decarbonisation Plan, providing
strategic direction on achieving net zero by 2045. 
4.0 RECOMMENDATIONS 
That the Policy and Resources Committee are asked to consider: 
Page 277

Page 278

4.1 The publication of the Council’s 2022/23 Public Bodies Climate Change Duties
report, confirming a 6% decrease in emissions reported for the year. The
Council’s carbon footprint reduced by 1,705 tCO2e, from 28,217 tCO2e in
2021/22 to 26,512 tCO2e in 2022/23, and
4.2  the Full Decarbonisation Tracker update attached at Appendix A. 
5.0 SUMMARY OF PUBLIC BODIES CLIMATE CHANGE DUTIES REPORT 
5.1 Since 2015/16 Argyll and Bute Council has published data on its annual carbon
emissions via the statutory Public Bodies Climate Change Duties Reporting
mechanism. Consistent reporting criteria enables year on year comparison.
Greenhouse gas emissions are measured in ‘tonnes of carbon dioxide equivalent’
(tCO2e), allowing comparison of different emission types. 
Table 1 – Annual Emissions with Baseline
Reference
Year
Year Scope1 Scope2 Scope3 Total Units Comments
Baseline
carbon
footprint
2015/16 10,768 11,701 16995 39,464 tCO2e 
Year 1
carbon
footprint
2016/17 9,146 9,790 16,594 35,530 tCO2e 
Year 2
carbon
footprint
2017/18 9,438 7,798 19,569 36,805 tCO2e Municipal waste
to landfill is the
Council's largest
contributor to its
carbon footprint;
despite a
reduction in
municipal waste
to landfill, the
significant
increase in the
relevant carbon
emissions factor
has caused an
upturn in scope
3 emissions.
Year 3
carbon
footprint
2018/19 8,937 5,862 19,938 34,737 tCO2e This represents
a 12% reduction
in 3 years.
Year 4
carbon
footprint
2019/20 8,849 4,687 15,107 28,643 tCO2e 
Page 278

Page 279

Year 5
carbon
footprint
2020/21 8,611 4,178 13,830 26,619 tCO2e 
Year 6
carbon
footprint
2021/22 8,905 4,236 15,076 28,218 tCO2e 6% increase
Year 7
carbon
footprint
2022/23 8,701 3,780 14,031 26,512 tCO2e 6% decrease 
5.2 Annual carbon footprint trend from 2015/16 to 2022/23 is shown in Graph 1 below. 
Graph 1 – Annual Carbon Emissions 
5.3 Emissions generated from all Council activities is reported, therefore it is useful to
examine emissions arising from different sources across Council teams – please
see Table 2 and Graph 2 below. All Council services have a responsibility to
monitor and reduce carbon emissions. 
39464
35530
36805
34737
28643
26619
28217
26512
20000
22000
24000
26000
28000
30000
32000
34000
36000
38000
40000
2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
tCO2e
Year
Argyll and Bute Council - Annual Carbon Emissions
Page 279

Page 280

Table 2 – Breakdown of Council Emission Sources 2022/23 
Emission Source Emissions (tCO2e) Comments
Municipal Waste to
Landfill
12,866 ~ 48% of total emissions
Natural Gas  3,829  ~ 14% of total emissions.
Gas used mainly as
heating source in
buildings.
Grid Electricity 3,445  ~ 13% of total emissions
Fleet – (petrol & diesel
vehicles)
2,805  ~ 11% of total emissions
Gas Oil & LPG 2,067  ~ 8% – mainly for building
heating
Street lighting  681 ~ 3%
Business Miles
(unspecified fuel)
358 ~ 1% 
All other activities  461 ~ 2% of total carbon
footprint includes
collections for recycling,
water treatment, tyre
processing, glass / WEEE
recycling 
Graph 2 – Breakdown of Council Emission Sources 2022/23 
48%
14%
13%
11%
8%
3%
1% 2%
Argyll and Bute Council Emission Sources Breakdown
2022/23
Municipal Waste to Landfill - 48%
Natural Gas - 14%
Grid Electricity - 13%
Fleet (petrol & diesel) - 11%
Gas Oil & LPG - 8%
Streetlighting - 3%
Business Miles - 1%
All other activities - 2%
Page 280

Page 281

5.4  Emissions generated by different Council activities have remained fairly
consistent for a number of years, and although small variations have been
reported, percentage contributions remain broadly unchanged. Municipal waste
disposed to landfill is responsible for approximately half of the total Council
emissions figure, however compliance with the Biodegradable Municipal Waste
Landfill Ban will realise future reductions for that particular emission source.
Additionally, continued decarbonisation of heat in buildings, installation of
renewable technology and energy efficiency measures along with the Council’s
fleet transitioning to electric and hybrid low-emission vehicles will support further
reductions in Council emissions. 
5.5  The Council continues to generate renewable heat and energy, with figures
provided in Table 3 below. 
Table 3 – Generation, consumption and export of renewable energy 2022/23 
Renewable Electricity  Renewable Heat
TECHNOLOGY Total
consumed by
the
organisation
(kWh)
Total
exported
(kWh)
Total
consumed by
the
organisation
(kWh)
Total
exported
(kWh)
Solar PV 950,000 0    
Wind 15,000 135,000    
Biomass     4,678,800 0
Air Source Heat
Pump    
130,000 0 
5.6  Graph 3 below shows all 32 Scottish Local Authorities annual carbon emissions
for 2022/23, with Argyll and Bute Council highlighted in red. Average emissions
across all local authorities is illustrated by the dotted line. It is difficult to compare
local authorities, with factors such as population, geographic area and internal
processes (particularly waste treatment) all impacting reported emissions. 
Page 281

Page 282

Graph 3 – Scottish Local Authorities 2022/23 Annual Emissions 
5.7  Looking ahead, there are anticipated changes to the data to be reported by
Scotland’s public bodies in the coming years, with an increasing focus on Scope
3 emissions arising from supply chain and procurement activities 
6.0 CONCLUSION
6.1  It is a requirement for our Council to publish annual carbon emissions for the
Scottish Government.  This report highlights our overall emissions for most recent
period 2022/23.  
7.0 IMPLICATIONS
7.1 Policy – Meeting obligations and commitment to Climate Change.
7.2 Financial – No direct linkage.
7.3  Legal – Meeting requirements of the Climate Change (Scotland) Act 2009, and  
the Climate Change (Emissions Reduction Targets) (Scotland) Act 2019.
7.4  HR - None
7.5  Fairer Scotland Duty: 
7.5.1   Equalities - protected characteristics - None 
7.5.2   Socio-economic Duty - None
0
20000
40000
60000
80000
100000
120000
Aberdeen City Council
Aberdeenshire Council
Angus Council
Argyll and Bute Council
City of Edinburgh Council
Clackmannanshire Council
Comhairle nan Eilean Siar
Dumfries and Galloway…
Dundee City Council
East Ayrshire Council
East Dunbartonshire Council
East Lothian Council
East Renfrewshire Council
Falkirk Council
Fife Council
Glasgow
City Council
Inverclyde Council
Midlothian Council
Moray Council
North Ayrshire Council
North Lanarkshire Council
Orkney Islands Council
Perth and Kinross Council
Renfrewshire Council
Scottish Borders Council
Shetland Islands Council
South Ayrshire Council
South Lanarkshire Council
Stirling Council
The Highland Council
West Dunbartonshire Council
West Lothian Counciltonnes of CO2 equivalent (tCO2e)
Local Authority
Scottish Local Authorities - 2022/23 Annual Emissions
Page 282

Page 283

7.5.3  Islands - None
7.6 Climate Change - Direct link updating activities of the Climate Change Board
and projects that will address climate change 
7.7 Risk - Not addressing impacts or causes of climate change can lead to
increased cost or censure if targets are not met.
7.8  Customer Service – None. 
Douglas Hendry 
Executive Director with Responsibility for Commercial Services 
Policy Lead for Climate Change, Renewables and Net Zero, Councillor Luna
Martin
15 August 2024                                              
For further information contact:
Ross McLaughlin, Head of Commercial Services 
Helensburgh and Lomond Civic Centre
ross.mclaughlin@argyll-bute.gov.uk
APPENDICES
Appendix A – Climate Change Decarbonisation Tracker – August 2024 
Page 283

Page 284

Appendix A – Climate Change Tracker
ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
W1 –Develop and Implement Waste
Strategy 
(L) Roads and
Amenity Services,
Community,
commercial
customers
Implementation of
the Waste Strategy
transitioning to
Landfill ban
compliant Residual
Waste Recovery
solutions by 2025.
External funding and support being
sought from the Scottish Government
Please see Environment,
Development & Infrastructure
Reports – links below:
WASTE PPP UPDATE.pdf (argyll-
bute.gov.uk)     Waste Update –
EDI committee 1/6/2023
WASTE PPP UPDATE.pdf (argyll-
bute.gov.uk)    Waste Update – EDI
committee 31/8/2023
WASTE UPDATE - EDI Nov
2023.pdf (argyll-
bute.gov.uk)    Waste Update – EDI
committee 30/11/2023
WASTE UPDATE.pdf (argyll-
bute.gov.uk) Waste Update – EDI
committee 20/6/24
W2 – Promote the Waste Hierarchy
through community Education 
(L) Roads and
Amenity Services
Evidence of
community
Education
Not secured New Web content and Education
materials for Primary and Secondary
Schools were developed and
delivered to online Education
Environment Summit October 21 and
the COP 26 Event on the 6th
November 21. Advised that this
action has paused/stopped.
W3 – Reduce Council use of disposable
and single use plastics across all
departments and settings 
(L) Procurement
and Commercial
Services, all
Council Services 
Adoption of new
working practices
and procurement
No specific funding in place, research
required to impact on operation
costs 
A report on Single Use Plastic went to
the Policy and Resources Committee
on 9 December 2021, and the
following recommendations were
approved:
• Note and consider that the
various Services that
Page 284

Page 285

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
currently purchase SUP
products consider whether
these products are essential
or if there is a potential
alternative that would meet
the Service requirements,
prior to orders being placed
via PECOS or contacting the
Procurement, Commercial
and Contract Management
Team (PCCMT) for a
procurement process to be
carried out.
• Note and consider that the
Sustainable Procurement
Policy will be updated to
reflect the Climate Change
Board desire to limit SUP
where possible –wording
has been included in the
Annual Review 2023/2024
version of the Procurement
Strategy 2022/2025 as
follows: “To provide
procurement support to any
strategic decisions taken by
the Council in relation to the
usage of Single Use Plastic
products and their
recyclability.” 
• Note and consider that the
Commodity Sourcing
Strategy templates used for
Regulated Procurements
Page 285

Page 286

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
have been updated to
include a question regarding
SUP.
Changes in legislation were brought
into force by the Scottish
Government on the 1st June 2022
restricting single-use plastic cutlery,
plates, straws, drink stirrers and
balloon sticks, expanded polystyrene
food containers and expanded
polystyrene cups and other beverage
containers, as well as all products
made of oxo-degradable plastic.  
Some products already changed and
others under review. 
W4 – Extend and explore pre-ordering
for school food to reduce food waste 
(L) Commercial
Services and 
Education 
Evidence of
extension of pre-
ordering & food
waste reduction
Project funded and solution procured Full implementation of Cashless
Catering and Pre-ordering system is
completed.
E1 – Deliver Renewable Sourcing
Strategy 2 
(L) Commercial
Services 
Adoption of
Strategy
RSS2 consultancy work funding to be
confirmed; expectation is that project
implementation will be through
combinations of prudential
borrowing (subject to business case
approvals) and/or external funding. 
RSS2 next stage development work
includes specification development
and preparation of invitation to
tender for specialist consultancy
support. Current work in progress;
intended to be market tested early
2024.  It is now considered that
RSS2 will be included within the Net
Zero Routemap. Following limited
response from hubNorth and some
discussions with other potential
providers, we have gone to the
market with a further RFI and
responses received in June 2024
will be used in the development of
Page 286

Page 287

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
the procurement strategy for Argyll
& Bute Council Net Zero Routemap.
E2 – Delivery of Non-domestic Energy
Efficiency Framework (NDEEF) Projects 
(L) Commercial
Services 
Evidence of delivery
of projects
Project development work is funded
by combinations of the Scottish
Government and the procured
provider (costs absorbed within the
tender process). 
Funding for project implementation
will come from Council approved
capital allocations:
• Climate Change 20/21 -
£500K
• Climate Change 21/22 -
£600K
• Asset Sustainability –  £175K
Non Domestic Energy Efficiency Fund
(NDEEF1) Energy Performance
Contract was signed on 16 July 2021
(circa £1.25m investment with 10
year payback). The originally
intended mini project list has been
fully delivered. Following on from the
P&R Committee report in May 2023:
May PR - Climate Change -NDEEF
Progress update.pdf (argyll-
bute.gov.uk), four final mini projects,
which were added as contract
variations, remained to be
implemented. Tarbert School LED
lighting was installed in the 2023
school summer recess; Kilmory
Nursery solar pv was installed in
September 2023; the intended low
carbon heating solution and pv
installation at Cardross PS have been
intentionally delayed whilst we try to
access a recently launched funding
scheme: Scotland’s Public Sector
Heat Decarbonisation Fund | Salix
Finance.  A bid was submitted by
the 5/12/23 fund deadline (value
£460K with the Council needing to
contribute 20% of that). Bid
outcomes will be communicated
February 2024.  Bid was unsuccessful
and subsequently £150k of funding
Page 287

Page 288

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
which was in the 2025/26 capital plan
for a replacement heating system has
been brought forward. Delivery of
the high efficiency heating system
will be Summer 2024. 
In addition to the above, the
procurement sourcing strategy for
the next batch of sites, using
designation NDEEF2, is under way.  A
spend to save investment of
£2Million is being targeted.  Awaiting
formal Scottish Government launch
of new NDEEF framework which is
currently expected Oct 2024.
E3 – Delivery of additional solar
installations at Council assets 
(L) Commercial
Services 
Evidence of delivery
of projects
Consultancy work funding to be
confirmed; expectation is that project
implementation will be through
combinations of prudential
borrowing (subject to business case
approvals) and/or external funding.
Best solar pv opportunities are being
delivered within NDEEF (Ref item E2)
and advantage is also being taken to
install solar pv solutions within the
asset sustainability capital
programme where possible  e.g. as a
component of roof upgrades.
The potential for a large solar pv
ground array at the Kilmory Estate is
currently being limited due to electric
grid constraints – engagement with
SSEN is ongoing to try to identify
solutions. 
The Council now has 27no solar pv
installations in operation amounting
to over 1.3MW capacity.
DRAX have offered installation of free
solar pv at Dalmally PS as part of the
community benefits flowing from the
Page 288

Page 289

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
planned expansion of Ben Cruachan
power station. Discussions have been
going on from June 2024.
E4 – Delivery of Water Efficiency Audits
across our Estate 
(L) Commercial
Services 
Evidence of delivery
of projects
Works items are generally small scale
and are being funded through
existing approved budgets where
possible; otherwise costs will be met
from savings generated.
Significant Council wide asset
verification exercise and ensuring
water use minimised. 
The asset verification element of this
project is substantially complete and
substantial savings have been
identified and recovered. A case
study is being prepared to
demonstrate the range of tasks
undertaken and to convey the scale
of savings made and refunds
received. The final stage of work
involves an exercise to reduce water
consumption (with carbon emissions
reduction) over a number of sites and
is underway.  Program to introduce
Water efficiency measures has
commenced and will be complete by
Q1 2025. 
E5– Delivery of Energy Efficiency
Scotland Programme 
(L) Housing
Services,
Registered Social
Landlords 
Evidence of delivery
of projects
Funding amounts are determined by
localised factors and is paid as a 
proportion of the Scottish
Governments’ Heat In Buildings
Strategy 
To date since 1st July 2023 Argyll and
Bute Council has spent £1,520,315 of
a £1,979,827 budget awarded by the
Scottish Government’s Energy
Efficient Scotland – Area Based
Scheme (ABS), facilitating insulation
measures on privately owned and
privately rented properties in
mainland and island addresses
throughout Argyll and Bute.  Non-
means tested grants of between
Page 289

Page 290

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
£9,000 and £21,000 are available to
all eligible households for the
application of insulation, helping to
significantly reduce household
consumption of energy on a “Fabric
First” basis contributing towards
both the Council’s and Scottish
Government’s carbon reduction
targets.   In addition, a joint project
on multi-tenure properties in
conjunction with Argyll Community
Housing Association in Bute and
Tarbert insulated 80 properties in
2023/24. 
E6 – Complete LED streetlight
replacement programme 
(L) Roads and
Infrastructure
Services
Evidence of delivery
of projects
Fully funded through prudential
borrowing
Works have gone well though there
are still approx.130 Luminaires to be
upgraded to LED in the Lorn Area –
The Luminaires are on order – Works
should be completed by end 2024.
The Council has 14442 streetlights in
total so carbon emissions have
already been greatly reduced by the
LED Upgrade Project.
In 2015/16, figures were CO2 totals –
3140 tonnes.  
2024/25 emissions are forecast to be
reduced again.  Year to date (end of
June 2024) carbon totals – 122
tonnes. 
E7 – Continue support of ABRA and
review Renewable Energy Strategy
annually
(L) Economic
Development
Evidence of delivery
of projects 
Officer resource to support currently
funded
ABRA met in March 2024 with a
further meeting being planned for
the autumn.  SSE Networks continue
Page 290

Page 291

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
upgrade works of overhead power
lines to increase capacity to 275kv. 
The outline business case for Islay
Energy System work through the
Rural Growth Deal has been rejected
by Government and amended
proposals are being prepared. The
Carbon Neutral Islands Capital Fund is
expected to launch imminently with a
value of £1m. 
E8 – Continue support for offshore
development of renewables 
(L) Economic
Development
Evidence of delivery
of projects
(expected late
2020s/early 2030s)
Officer resource to support currently
funded
Scottish Power Renewables are
progressing the Machair Wind
project , expected to seek consent
during the mid -2020s.  ESB are
progressing Malin Wind, a floating
wind proposal awarded through the
INTOG leasing. 
T1 – Develop a Fleet Replacement
Strategy supportive of fuel efficient,
electric and hybrid vehicles 
(L) Roads and
Infrastructure
Services
Adoption of
Strategy
Part for current financial year The Fleet Replacement Strategy is
complete but is subject to on-going
change in line with legislative
changes as it is an operational
document.
T2 – Develop a vehicle routing system
that will reduce road miles for
operations 
(L) Roads and
Infrastructure
Services
Evidence of delivery
of projects
Part for current financial year  This is progressing. The project has
slipped slightly due to staff
availability and the data gathering
and cleansing stage taking longer
than we might have hoped. There
was a report to EDI in March which
sets out the revised position and
project timeline. 
T3 – Develop an electric vehicle
infrastructure strategy 
(L) Roads and
Infrastructure
Services
Evidence of delivery
of projects 
Part for current financial year  The strategy and expansion plan is in
place – we cannot move forward with
a delivery programme until such time
Page 291

Page 292

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
The development of the EV network
is funded by external grant monies
from Transport Scotland, and the
costs of developing the strategy in
terms of staff time are covered via
existing budgets
Ultimately the cost recovery model 
as our funding from SG is confirmed.
The national EVIF programme is
seeing some delays and changes in
guidance and application process. All
Councils are in the same position and
we are in discussions with TS/SG on
how the programme will operate
going forward and when we are likely
to see a funding award. 
We have, through a separate fund
accessed via HiTRANS, progressed
the installation of 8 new rapid
chargers across the area in the last
quarter of 2023 and these are in
place and being well used.  This
brings our network up to 37. 
We have also introduced new
charges which are designed to cover
all asset management costs for the
network. These costs fall now to the
Council after having previously been
funded through grants. 
We are also continuing to progress
installs at Council hub offices with the
next sites being {Union St Rothesay
and Kintyre House Campbeltown 
T4 – Support Digital by Default theme
Service Review & Recovery Plan to
reduce need to travel
All Council
Departments
Evidence of delivery
of projects
Part for current financial year Council is adopting ‘Our Modern
Workspace’ programme and  Digital
First approach as services change and
evolve post pandemic.  
Page 292

Page 293

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
T5 – Develop new active travel plans for
Council buildings and our towns 
(L) Economic
Development
Evidence of delivery
of projects
No active travel funding is provided
by Council.  All costs, including internal
staff costs (1.7FTE), have to be funded
via successfully securing external
challenge funds. As all active travel
work is currently reliant on securing
external funding, the projects which
are progressed are those which can
successfully secure external challenge
funding. 
External competitive challenge funds
are time consuming to secure and
projects have to be shaped to fit with
external funders’ aspirations and
requirements by the 1.7FTE Active
Travel staff in the Strategic
Transportation Team. However, at
present these are the only available
source(s) of funding made available
to deliver active travel
improvements. 
2023/24 Progress 
The 1.7FTE Active Travel Team
secured £2.56M external challenge
funding in 23/24 for development
and delivery of 22 active travel
projects across Argyll and Bute,
requiring 18 separate competitive
challenge funding applications to 5
separate funds. 
The purpose of active travel is to
make it as easy as possible and help
to encourage individuals, businesses
and visitors to choose to walk, wheel
or cycle for local journeys.  Increasing
activity and reducing sedentary
behaviour has significant health
benefits and can increase accessibility
to essential services, education,
employment, retail and
leisure.  Walking and cycling are
lower cost travel modes and, if they
are a viable option, can help
households reduce their reliance on
private cars, particularly multiple car
households.
No Council funding is currently
expended on Active Travel work, with
all costs, including internal staff costs
(1.7FTE), having to be funded via
successfully securing external
challenge funds. As all active travel
work is currently reliant on securing
external funding, therefore the
projects which are progressed are
those which can successfully secure
external challenge funding. 
Argyll and Bute Active Travel
Strategy: Officers are working to
develop an Argyll and Bute Active
Travel Strategy and present it for
Council by the end of 2024.  The
Active Travel Strategy would provide
Page 293

Page 294

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
Projects funded via the active travel
team within Strategic Transportation
in 2023/24 included: 
• New cycle parking at the
community owned Port Ellen
Playing Fields Community
Development, Islay.
• Funded Cycling UK to run the
Dunoon Cycle Bothy
• Funded ACT to upcycle 65 bikes to
return to the local Mid-Argyll
Community to increase
opportunities to cycle.
• Creation of new Smartphone Apps
for Tobermory and Bowmore
(adding to the existing popular
apps for Campbeltown, Dunoon,
Helensburgh, Oban and Rothesay)
• Design work progressed for
ambitious walking and cycling
projects including:
- Campbeltown, commenced initial
design work on Phase 4 Active
Travel Improvements (Esplanade
and Kinloch Park) (initial
Feasibility).
- Dunoon, Town Centre to Hunters
Quay Active Travel route
(Concept Design).
- Helensburgh: Helensburgh –
Cardross – Dumbarton Cyclepath
(Developed Design)and
the overarching context for the
Council to support and promote
active travel across the Council area.
Having an adopted and current Active
Travel Strategy is increasingly
becoming a pre-requirement to
access Scottish Government derived
active travel funding. 
Active Travel Delivery Plan:
Following approval of Active Travel
Strategy, an Active Travel Delivery
Plan will be developed to create a
prioritised list of active travel projects
for the whole of Argyll and Bute. 
Active Travel Projects: The majority
of external funding available is
provided by the Scottish Government
via a number of distribution
organisations who are paid to
administer these funds.  The focus for
Scottish Government Active Travel
funding is to develop and deliver
infrastructure projects and associated
behaviour change.  As such, the focus
for the very limited staff capacity in
the Active Travel Team has been to
develop and deliver infrastructure
projects across Argyll and Bute with a
focus on our main towns and
locations with strong community
support. 
Page 294

Page 295

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
Helensburgh – Garelochhead
Cycleway (final Technical Design).
- Islay, Bowmore to Bridgend Path
(with Islay Community Access
Group) (final Technical Design).
- Jura, Craighouse to Corran Sands
Active Travel Route (Concept
Design).
- Lochgilphead: Front Green to
Crinan Canal (Concept
Design)and Town Centre to Joint
Campus Active Travel Routes
(final Technical Design).
- Rothesay, Pavilion to Albert Pier
Active Travel Improvements
(Concept Design).
Oban, Oban Town Centre North 
Active Travel Improvements
(George St and Corran Esplanade)
(Concept Design) – concept
design proposals rejected by OLI
Area Committee on 25 June 2024.
Active Travel Plans for Towns: There
are Active Travel Plans in place for
the main towns in Argyll and Bute,
albeit some are now quite
historic.  The town Active Travel Plans
focus on identifying potential active
travel route networks for key
towns.  These provide a framework
for the development of new active
travel routes, which will enable and
encourage residents, businesses and
visitors to choose to travel more
actively.  No funding is currently
secured to enable the Active Travel
Plans for towns to be updated. 
Council Staff Travel Plan: Officers are
exploring options to develop a
Council Staff Travel Plan at zero cost
to the Council.  However, this is
challenging due to the ongoing
uncertainty of longer-term staff
profiles and bases.  There is currently
no funding secured to enable this
work to be progressed.  
It should be noted that successful
Staff Travel Plans require to have
strong support from senior
managers/elected members, who
also require to act in accordance with
the Plan, and from enabling
departments, e.g. finance and HROD. 
Once developed, to be fully effective
it is likely that a Staff Travel Plan
Page 295

Page 296

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
would require changes to the
Council’s travel policies and expenses
policies. 
Staff Travel Plans focus on measures
to make it easier and preferable for
staff to choose to walk, cycle, use
public transport or car share to
commute to work or for work
journeys, or use economical pool
vehicles for work journeys.   A travel
plan should encourage staff to
choose the most economical and
least environmentally damaging
travel mode.  Engagement will be
required with services which manage
staff in buildings and/or council
buildings as this is essential to
creating deliverable and effective
travel plans for staff.  This includes
Estates, HROD, SMT and building
users. 
PA1 – Review Council Flooding & Coastal
Protection Policy 
(L) Roads and
Infrastructure
Services
Review of policy No specific funding in place, research
required to impact on operation
costs
Reviews are in process. 
PA2 – Review Council Sustainable
Procurement Policy 
(L) Procurement  Review of policy  No specific funding in place, research
required to impact on operation
costs
This policy is reviewed on an annual
basis. 
Page 296

Page 297

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
OFF1 – Develop opportunities for
environmental sustainability projects
with ACT and partners 
(L) Climate
Change Board,
ACT and partners
Delivery of projects  Limited funding via ACT for existing
projects
SSEN compensatory planting – Phase
1 and 2 complete at Kilmory. 
ACT has completed habitat surveys in
the Glenan Wood area in Cowal for a
biodiversity net gain project
supported by SSEN.  This project
would see 50 hectares of Rainforest
cleared of invasive rhododendrons
and form part of the landscape scale
rainforest restoration project in West
Cowal.  The other Argyll landscape
scale project ACT is involved with is
Knapdale.  These are 2 of the 7 focus
rainforest projects in Scotland
supported by  the Alliance for
Scotland’s Rainforest.
https://savingscotlandsrainforest.
org.uk/projects 
ACT has entered agreement with
Mastercard’s Priceless Planet
Coalition to plant 100,000 native
trees in West Cowal over the coming
5 years.  Cowal sites are confirmed,
planting late ’24. This planting will
offer opportunities for carbon credits
for landowners. 
ACT have secured funding from the
National Lottery Heritage Fund to
establish a Rainforest Squad, and a
new Farm and Croft Woodland
Advisor.  We also have funding for a
Page 297

Page 298

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
Rainforest Restoration project, and
Rainforest Volunteer Co-ordinator as
partners in a £6M Woodland Trust
lottery bid. 
ACT undertaking peatland
restoration on Islay, Jura and
extending into mainland Argyll,
supported by ScotGov’s Peatland
Action and Esmee Fairbairn
Foundation.  There are two posts,
one on Islay, one shortly to be
advertised in Mid Argyll/Kintyre.  We
will also be offering a 1-year trainee
position in 2024. 
Within 2024 ACT will be recruiting 6
full time and one part time new
environmental jobs in Argyll. 
ACT is hosting the Community
Planning Partnership’s Climate
Action Manager to develop a Climate
Action Strategy and Action Plan over
a 2 year period. The CPP agreed an
approach of developing an enabling
strategy early in order to allow more
space to focus on developing the
action plan. A first draft was
presented to the  CPP’s Climate
Working Group for review in March-
April, with a request for all to send
any further sources of information,
contacts, comments 
Page 298

Page 299

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
and feedback on the Strategy
structure outline directly to the
project manager. The project
manager has also been invited to
participate in the Council’s Climate
Change Board. Next steps for the
strategy are to issue a call for
evidence while developing risk and
opportunity assessments
methodologies with support from
Adaptation Scotland/SNIFFER, with a
view to running assessments
grouped by the CPP’s three
outcomes of Transport, Housing and
Community Wellbeing. 
In addition, ACT has partnered with
the Third Sector Interface and Time
for Change to become the ABCAN
(Argyll and Bute Climate Action
Network) Hub.  The ABCAN project,
which is Scottish Government
funded, has supported 39
community groups with funding to
undertake climate action so far. The
Team continues to engage with local
communities on climate action,
climate literacy, place planning with
a climate lens and working to
develop the partnership network
across Argyll & Bute and engaging
with the strategic activity of the CPP
Climate project. 
Page 299

Page 300

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
Carbon Literacy Training – Cooler
Futures schools programme and ACT
Outdoors STEM subject delivery
offered with the  ACTNow project. 
ACT keen to support Argyll and Bute
Council in achieving Carbon Literate
Organisation silver accreditation. 
ACT delivering Bikes Back to the
Community with the support of
Smarter Choices, Smarter Places
funding.  
ACT has two electric bikes available
for groups and businesses and
Councillors/Council officers to trial. 
ACT is the lead partner in a successful
Alliance for Scotland’s Rainforest bid
to the Facility for Investment Ready
Nature in Scotland fund– to facilitate
private finance investment into
habitat restoration.  Contracts to
research Project Standards and
Integrity Charter, an Enterprise
Model and apply to a pilot area
within Argyll are underway. 
Concludes March 2025. 
ACT is preparing a proposal to Argyll
and Bute Council to establish a
Woodland Enterprise Hub at Kilmory
(adjacent to MAKI Pups site) which
will be the base and training site for
ACT Rainforest Squad who can offer
Page 300

Page 301

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
woodland management services. 
This project has been supported by
an award from the National Heritage
Lottery Fund, and DRAX who has
supported ACT to establish a Tree
Nursery as part of the proposal. 
Other actions that ACT and partners
are or seek to be engaged with are 
W2 – Promote the Waste Hierarchy
through community Education: ACT
are heavily involved in delivering
Carbon Literacy training which
includes Waste Hierarchy 
E2 – Delivery of Non-domestic Energy
Efficiency Framework (NDEEF)
Projects: ACT: some engagement with
RGD and potential to stimulate
circular economy via this, and grid
constraints. Also how to capture this
activity to include in what is currently
happening v gap analysis
E4 – Delivery of Water Efficiency
Audits: This will also support
resilience to a changing climate
where we can expect hotter, drier
summers, in addition to reducing
carbon footprint 
E5– Delivery of Energy Efficiency
Scotland Programme: ACT – Housing
is one of the Community Planning
Page 301

Page 302

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
Partnership’s overarching priorities.
Keen to explore how CPP Climate
Schange Strategy can complement
this work, including local skills
development, making homes fit for
heatwaves as well as affordable
warmth, and to what extent a unified
voice across CPP partners can help
with grid capacity 
E7 – Continue support of ABRA and
review Renewable Energy Strategy
annually: ACT note interest in the
community in increasing community
ownership share of renewables in
order to support low carbon energy
security and generate revenue 
E8 – Continue support for offshore
development of renewables: Act as E7
above 
T2 – Develop a vehicle routing system
that will reduce road miles for
operations: ACT via CPP Climate
Change Strategy project would be
keen to explore how to encourage
other Community Planning
Partnership members to replicate
under a joint climate strategy 
T3 – Develop an electric vehicle
infrastructure strategy: As with T2
above – some CPP partners have
Page 302

Page 303

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
commented that this is a
consideration constraining their
transition to EVs 
T4 – Support Digital by Default theme
Service Review & Recovery Plan to
reduce need to travel: ACT: given the
widespread nature of Argyll and Bute
communities and settlements,
measures that reduce need to travel
are of particular strategic importance
for Argyll and Bute both in terms of
reducing emissions and reducing
vulnerability, more so if adopted
widely among CPP partners 
T5 – Develop new active travel plans
for Council buildings and our towns:
ACT: as in T4 above. This strongly
supports the Community Planning
Partnership’s outcome of Community
Wellbeing in addition to Transport 
PA1 – Review Council Flooding &
Coastal Protection Policy: ACT would
welcome engagement with this
including incorporating into a high
level climate risk assessment for the
regions, and also to scope
opportunities to take forward
elements such as enhancing
community resilience pending
availability of funding for
complementary capital works
Page 303

Page 304

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
PA2 – Review Council Sustainable
Procurement Policy: ACT would
welcome greater engagement with
this including how the CPP Climate
Strategy could support
implementation of the Policy in
conjunction with Community Planning
Partners such as under the
Community Wealth Building
workstream 
COMM1- Develop and deliver
Communications Plan to support
Decarbonisation Plan: ACT to feed
into this where appropriate –
currently via the CPP climate change
signposting page Community
Planning Partnership - Climate
Change | Argyll and Bute Council
(argyll-bute.gov.uk) 
COMM2 - Engage with community
and partners and deliver Climate
Change Directory for our region: This
is not a specific work stream for ACT
but the ACT NOW/ABCAN Hub
network is heavily engaged in climate
outreach 
COMM3 - Monitor the delivery of
actions in the Climate Change Action
Plan and review in 2024: ACT: the
Decarbonisation Plan Tracker
Page 304

Page 305

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
provides an excellent model for
monitoring progress complementing
the formal public body Climate Duty
reporting requirements and these
should constitute the bulk of
monitoring requirements for the CPP
Climate Change Strategy for Argyll &
Bute 
COMM1- Develop and deliver
Communications Plan to support
Decarbonisation Plan 
(L) Climate Change
Board and
Communications
Team
Delivery of
Communications
Plan
Part of Communications Support  External communications
We continue to promote actions the
council is taking, and actions that
others can take, to develop climate-
friendly Argyll and Bute. For example: 
• Promoting the Better
Journeys Campaign
• Rothesay travel consultation
• New rapid EV chargers
• Helensburgh safer walking
and cycling
• Tackling threat of climate
change remains a priority
(press release/social media)
• Dunoon Active Travel
• Sustainable Food
Partnership
• Islay High/ACT peat project
• Beat the Street –
encouraging people to walk
• Oban active travel
• Council continues to create
climate friendly Argyll and
Page 305

Page 306

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
Bute (press release/social
media)
• St Columba’s Primary
outdoor learning
• Strone Primary Forester’s
Award
• Cut waste to landfill
• Two separate two-week
recycling campaigns
• Tarbert travel consultation
• Better Journeys travel apps
• Did you know social media
posts about bin calendars
• SM post about council
cutting carbon emissions 
• SM post about what your
recycled products get made
into
• Rothesay pupils outdoor
learning
• 27 of our schools and
nurseries have Eco-Schools
Green Flag status
• Mid Argyll travel app
• How to reduce food waste
• Be a great visitor campaign
• Argyll’s rainforest
• CGS pupil’s climate change
art wins national award
• Waste compliance funding
• Bin review 
Page 306

Page 307

ACTION LEAD (L) AND
PARTNERS
TARGET or
MILESTONE
FUNDING COMMENTS 
COMM2 - Engage with community and
partners and deliver Climate Change
Directory for our region 
(L) Community
Planning and
Development
Team
Delivery of
engagement map 
In place until end of financial year The CPP Climate Change signposting
page is  live 
https://www.argyll-bute.gov.uk/cpp-
climate-change   with further entries
added as they are received. 
The dedicated Climate Change
funding opportunities search,
available through the signposting
page, is conducted and an updated
document produced on a regular
basis. 
The Community Planning team
established the CPP Climate Change
Working Group which has developed
a collaborative funding package and
work to deliver a Climate Change
Plan for the area. (see update on ACT
and partners within this report)
COMM3 - Monitor the delivery of actions
in the Climate Change Action Plan and
review in 2024
(L) Climate Change
Board 
Review of this plan
by December 2024 
Monitored through Tracker to be
submitted quarterly to Policy &
Resources Committee. 
Completed – next review Dec 2024   
Page 307

Page 308

This page is intentionally left blank

Page 309

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE
CLIMATE CHANGE BOARD         15TH August 2024 
CLIMATE CHANGE BOARD UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1      The Climate Change Board reports progress to the Policy and Resources
Committee on a regular basis. This report outlines overarching activities of
the Climate Change Board over the last quarter. The Council’s work on
climate change continues to align with the Decarbonisation Plan, which is
the Council’s key climate change document, adopted in December 2021,
confirming the Council’s commitment to achieving net zero emissions by
2045, in line with the Scottish Government’s target. 
1.2  The Council continues to progress spend plans for the Scottish         
Government’s Nature Restoration Fund. The Committee is asked to
consider the proposal to vary allocated funding amounts to meet schools’
funding requests. 
1.3      Argyll and Bute Council has responded to the public consultation on the
Scottish Government’s draft Scottish National Adaptation Plan 3. The
finalised Plan will be published in Autumn 2024. 
1.4      Council Officers propose the use of the new Sustainable Scotland
Network’s Leaders’ Climate Emergency Checklist to assess and support
the Council’s climate change capabilities. 
2.0      RECOMMENDATIONS
That the Policy and Resources Committee are asked to:  
2.1  Agree the proposal to vary / redistribute existing funding amounts allocated
to three funding activities via the Scottish Government’s Nature
Restoration Fund based on subscription and feedback from our schools.
Page 309 Agenda Item 16

Page 310

2.2 Note the Council’s Officer-led response submitted to the Scottish
Government’s draft Scottish National Adaptation Plan 3 public
consultation.
2.3  Agree to implement the Sustainable Scotland Network’s Leaders’
Climate Emergency Checklist to support the Council’s assessment and
development of climate change capabilities, in line with SSN Guidance.   
Page 310

Page 311

ARGYLL AND BUTE COUNCIL   POLICY & RESOURCES COMMITTEE 
CLIMATE CHANGE BOARD         15th August 2024 
CLIMATE CHANGE BOARD UPDATE 
3.0 INTRODUCTION  
3.1   The Climate Change Board reports progress to the Policy and Resources
Committee on a regular basis. This report outlines overarching activities of the
Climate Change Board over the last quarter. The Council’s work on climate
change continues to align with the Decarbonisation Plan, which is the Council’s
key climate change document, adopted in December 2021, confirming the
Council’s commitment to achieving net zero emissions by 2045, in line with the
Scottish Government’s target. 
4.0 RECOMMENDATIONS
That the Policy and Resources Committee are asked to: 
4.1  Agree the proposal to vary / redistribute existing funding amounts allocated to
three funding activities via the Scottish Government’s Nature Restoration Fund
based on subscription and feedback from our schools.
4.2 Note the Council’s Officer-led response submitted to the Scottish Government’s
draft Scottish National Adaptation Plan 3 public consultation.
4.3 Agree to implement the Sustainable Scotland Network’s Leaders’ Climate
Emergency Checklist to support the Council’s assessment and development of
climate change capabilities, in line with SSN Guidance.   
Page 311

Page 312

5.0 SUMMARY UPDATES OF CLIMATE CHANGE BOARD
A – Scottish Government Nature Restoration Fund
5.1  At the previous Policy and Resources Committee meetings held on 12th October
2023 and 7th December 2023, the Committee agreed to allocate Scottish
Government Nature Restoration Funding towards three different activities
including the School Biodiversity Fund (£68,000), Tree Planting Fund (£75,000)
and School Food Waste Composting Fund (£60,000). Commercial Services were
tasked to develop spending plans for the three funding streams, with the Climate
Change Board, Education Services and Finance working together to allocate this
capital funding to ELCCs, primary schools and secondary schools. 
5.2 At end of May 2024, 28 education establishments submitted applications
requesting funds to buy equipment and materials that will enhance biodiversity
and tackle school food waste, creating new opportunities for children and young
people to learn and take action on nature restoration and climate change. The
School Biodiversity Fund was the most popular funding stream, and was over-
subscribed (£116,610 has been requested by schools, against the agreed
allocation of £68,000). Fewer funding requests were made under the Tree
Planting Fund and School Food Waste Composting Fund, with both underspent.
5.3 In order to meet the funding requests submitted by our schools, the Policy and
Resources Committee are asked to consider the proposed changes to the agreed
amounts allocated to the three funding activities:
I. That £48,610 of underspent funds from the Tree Planting Fund and the
School Food Waste Composting Fund be reallocated to meet the
overspend of funding requested via the School Biodiversity Fund. 
II. That Council Officers continue to work with our Education establishments,
seeking additional funding applications to allocate the remaining unspent
balance of funds under both the Tree Planting Fund and the School Food
Waste Composting Fund.
5.4 Both of the above recommendations will help ensure Scottish Government Nature
Restoration Funds are fully allocated, whilst maximising the benefits for our
children, young people, nature and climate.  The identification of projects and
distribution of this fund is a Council decision without recourse to Government
ensuring that the project purpose meets the criteria set out by the Nature
Restoration Fund.   
B – Argyll and Bute Council Consultation Response to Scottish Government Draft
Scottish National Adaptation Plan 3
5.5 The Scottish Government published the draft Scottish National Adaptation Plan 3
for public consultation in January 2024. Once finalised, the Scottish National
Adaptation Plan 3 is expected to be published in autumn 2024 and will cover a
Page 312

Page 313

five year period from 2024 to 2029, replacing the current Scottish Climate Change
Adaptation Programme 2 which was launched in 2019.
5.6 ELT confirmed that an Officer-led response to the public consultation was
required. This was developed collaboratively, with expert input from a range of
cross-Council services. Additionally, a briefing session was delivered at Climate
Change Board in March 2024. The Council’s consultation response was
submitted ahead of the April 2024 deadline. 
5.7 The Scottish Government will publish an analysis report, summarising findings
based on all consultation responses submitted. The analysis report will be
published on the Scottish Government website. 
C - Sustainable Scotland Network Leaders’ Climate Emergency Checklist
5.8 Sustainable Scotland Network Leaders' Climate Emergency Checklist is
designed to enable senior leaders in the public sector to assess their
organisation's maturity and capability in tackling the climate and nature
emergencies. The Sustainable Scotland Network (SSN) developed this
Checklist in partnership with the SSN Steering Group, SOLACE, COSLA and
the Improvement Service.
5.9 The Checklist offers a high-level assessment of where action is needed on
embedding climate emergency (and nature) responses including adaptation
and mitigation in public sector service planning and delivery. The checklist
equips leaders to understand legislative responsibilities and align with national
and local policy developments while ensuring a just transition that delivers
sustainable benefits for Scotland’s people and environment.
5.10 The Checklist has seven themes: Strategy; Targets; Governance; Delivery;
Finance; Performance; Skills. Three levels of gradings can be allocated against
each of the seven themes: Foundation, Advanced and Exemplary. The
Checklist also provides a prompt for bodies to identify ‘Improvement Actions’.
5.11 SSN Guidance indicates that the Leaders’ Climate Emergency Checklist should
supplant the 2015 Climate Change Assessment Tool as a way for public sector
bodies to self-assess climate capabilities and performance. 
5.12 The Leader of the Council and Chief Executive recently received
correspondence from Scottish Government commending the Checklist and
Officers of Climate Change Board also consider it to be a valuable tool in
supporting net zero ambition.  The Policy and Resources Committee are asked
to endorse that Officers consider and use the SSN Leaders’ Climate
Emergency Checklist to support the Council’s self-assessment of climate
change capabilities, in line with SSN Guidance.  Further updates on the use of
this Checklist will be provided at future meetings of Policy and Resources
Committee.   
Page 313

Page 314

D – Local Heat And Energy Efficiency Strategy (LHEES)
5.13 The Scottish local authorities are obligated to develop a Local Heat and Energy
Efficiency Strategy (LHEES) in compliance with the Local Heat and Energy
Efficiency Strategies (Scotland) Order 2022. The process for formulating an
LHEES is as follows: 
5.14 Argyll and Bute Council’s LHEES draft strategy has been finalised, and the
delivery plans are scheduled for completion by the end of June. These documents
have been shaped through collaboration with the LHEES Focus Group, the
Climate Change Board, and the Argyll and Bute Energy Efficiency Forum.
Furthermore, two specialised events were organised for internal and external
stakeholders to establish the LHEES priorities. 
The next proposed stages are:
• Present the LHEES strategy and delivery plan to committee in the
autumn.
• Seek permission to publish a consultative draft of the strategy and
delivery plan.
• A one-month consultation and engagement process would follow
immediately after committee.
• The responses received during the consultation period will be
reviewed, and the LHEES documents will be adjusted accordingly.
• The revised and finalised document would go to seek approval at full
Council. 
E - Argyll and Bute Renewables Alliance (ABRA)
5.15  ABRA met in March and received updates on three significant renewables
projects. Machair Wind
(www.scottishpowerrenewables.com/pages/machairwind.aspx) is a largescale
offshore wind proposal being proposed by Scottish Power Renewables. The
Page 314

Page 315

Machair Wind Team have been engaging with communities on Islay, Jura and
Colonsay and hope to expand this to Mull and Iona shortly. Malin Sea Wind
(https://malinseaoffshorewind.com/) is an innovative floating, offshore wind
proposal being promoted by ESB. Community consultation events took place in
June 2024 on Islay and at Campbeltown. The expansion of the Cruachan
Pumped Storage Hydro Power Station (www.cruachanexpansion.com) has been
granted consent and is proposed to more than double the capacity of this power
station. If successful the projects could be generating power in the late 2020s and
early 2030s.
5.16  An update was also provided by SSE Networks Distribution on their Whole
System Energy Solution work relating to the Inner Hebrides
(https://www.ssen.co.uk/about-ssen/our-works/whole-system-energy-solutions-
for-the-scottish-islands/), they are currently working on a submission in January
2025 to Ofgem. If successful, this would provide funding which would enable
upgrades to island grid infrastructure to support the transition to net zero and
support energy security. 
F - Carbon Neutral Islands Programme
5.17  Following the publication of the Community Climate Action Plan for Islay, the
selected island within Argyll and Bute, the government has now announced a £1m
capital challenge fund aimed at supporting the objectives of the Carbon Neutral
Islands work. Applications are due for submission by 30 August 2024. The
Council is working with Islay Energy Trust, as the key local organisation involved
in creating the Islay Community Climate Action Plan, to identify project proposals
which may suitable for submission. 
G - 20 Minute Neighbourhood
5.18  The Council continues to support and promote the ‘Love Local’ message as
supporting our local businesses can have both economic and environmental
benefits. The new design Argyll and Bute Gift Card
(www.argyllandbutegiftcard.com) is now available, and as well as being
purchased online the cards can be bought at Keeping It Local in Campbeltown
and Lochgilphead Post Office. 
H – Argyll Countryside Trust (ACT) Update
5.19 Argyll is one of the UK’s most afforested regions. Woodland cover accounts for
over 30% of the region’s land cover and 15% of Scotland’s woodland resource.
Over 71% is actively managed commercial conifer forestry which needs to
adapt to climate impacts and play its part in addressing biodiversity loss.
Therefore, as a region, Argyll is ideally placed to lead the shift towards a
resilient style of forestry fully integrated into the native woodland landscape –
Page 315

Page 316

this will require a workforce and communities with the skills and capacity to
realise that ambition. 
5.20 ACT’s rainforest 2045 targets will require a significant step change in availability
of skilled woodland and herbivore managers working in Argyll’s rainforest and
forestry sector. There simply are not enough woodland contractors, land
managers with capacity, and student, trainee and volunteering opportunities to
restore rainforest sites. A Hub for woodland workforce development and growth
is a crucial first step in ACT’s rainforest strategy. The Hub will provide a base
for:
• ACT Rainforest Squad which will ensure that there will be Argyll
based contractors and volunteers with the skills, knowledge and
qualifications to take Argyll’s Rainforest Strategy forward. 
• A Native Tree Nursery. Through ACT’s native woodland creation
during 2021/22/23 and planning for 2024 seasons, there is an
identified and significant need for native trees with west coast
provenance. The establishment of ACT Seed Collection Programme
and Native Tree Nursery will enable ACT to meet demand from its
own planting projects plus when scaled up, to provide stock for other
land managers in the area. 
5.21 ACT Rainforest Hub will be focussed around Kilmory Walled Gardens and
Kilmory Castle, where ACT already provide the MAKI Pups outdoor nursery for
3-5 year olds, and ACT's staff base within Kilmory Castle. The Hub will also
provide a site for ACTNow's recycle project which saves bikes from landfill,
repairs them and gifts them back to the community. 
5.22 ACT's nature restoration projects have attracted funding to allow ACT to
provide one new part-time and six new full time jobs in Argyll in 2024. 
I - Argyll and Bute Climate Action - Community Planning Partnership Climate
Change Strategy
5.23 The purpose of this project is to undertake a climate risk assessment for Argyll
and Bute as a whole and to develop a Climate Change Strategy and Action
Plan comprising an integrated set of adaptation, mitigation and engagement
actions for the region. Argyll and Bute Council with other Community Planning
Partnership partners have provided funding for a Project Manager for two years,
employed by ACT, with a Steering Group drawn from the Climate Working
Group of the Community Planning Partnership.
5.24 The project is working closely with ABCAN (Argyll & Bute Climate Action
Network) Hub, funded by the Scottish Government and also employed by ACT,
taking a collaborative approach to predominantly grassroots climate change
mitigation, adaptation and engagement in Argyll and Bute.
Page 316

Page 317

5.25 The Climate Change Working Group agreed that the emphasis should be on
early production of an enabling strategy in order to allow more time to
concentrate on development of the action plan with partners, following which
the group approved a draft produced in spring as a working document, in
support of the vision that “We make Argyll and Bute climate ready by acting
together to understand and adapt to our changing climate”.
5.26 Key principles agreed include:
• The strategy is to support partners to identify or create
opportunities appropriate to Argyll and Bute’s geography and
resources, especially through partnership working, to
complement action that they are already taking individually.
• The strategy can support partners to meet duties: it does not
replace existing duties and does not have a mandate to create
new duties.
• Outcomes from key national climate strategies and local partners
have been mapped and aligned with the three CPP Transport,
Housing and Community Wellbeing outcomes.
• Use of existing reporting mechanisms, principally the Public Body
Climate Duty reporting requirements, where possible.
• Recognise and work within the limits of the areas where CPP
partners have control and where they can seek to influence.
Notably, private sector emissions may be outwith the scope of
influence for the CPP, but it remains important that businesses
can be supported to reduce emissions as well as enhance their
resilience.
• The proposed national adaptation strategy places high
expectations on the role of communities as part of an overall
resilience response.
• Engagement has been predominantly with institutions and key
contacts but working closely with the grassroots engagement
programme of the Climate Action Network Hub work funded by
Scottish Government which has greatly extended reach. The
strategy project is also adding value to the Hub work.
• The project is also collaborating with the CPP and Council
workstream developing Area Plans (working name). 
5.27 Immediate next steps are: Ongoing engagement, including a call for evidence,
and noting the importance of engaging with young people; Gap analysis, and
risk and opportunity assessment methodologies aligned wherever possible with
Council and other CPP partner methodologies and supported by Adaptation
Scotland; Risk and opportunity assessment workshops, with the proposal to
group these by CPP Outcomes.
Page 317

Page 318

6.0 CONCLUSION
6.1  This report provides various updates in relation to the Council’s activities in
relation to Climate Change. 
7.0 IMPLICATIONS
7.1 Policy – Meeting obligations and commitment to Climate Change.
7.2 Financial – No direct linkage.
7.3  Legal – Meeting requirements of the Climate Change (Scotland) Act 2009, and  
the Climate Change (Emissions Reduction Targets) (Scotland) Act 2019.
7.4  HR - None
7.5  Fairer Scotland Duty: 
8.5.1   Equalities - protected characteristics - None 
8.5.2   Socio-economic Duty - None 
8.5.3  Islands - None
7.6 Climate Change - Direct link updating activities of the Climate Change Board
and projects that will address climate change. 
7.7 Risk - Not addressing impacts or causes of climate change can lead to
increased cost or censure if targets are not met.
7.8  Customer Service – None. 
Douglas Hendry 
Executive Director with Responsibility for Commercial Services 
Policy Lead for Climate Change, Renewables and Net Zero, Councillor Luna
Martin
15 August 2024
For further information contact:
Ross McLaughlin, Head of Commercial Services 
Helensburgh and Lomond Civic Centre
ross.mclaughlin@argyll-bute.gov.uk 
Page 318

Page 319

ARGYLL & BUTE COUNCIL  POLICY AND RESOURCES
COMMITTEE 
LEGAL AND REGULATORY SUPPORT  15 AUGUST 2024 
EXTRACT OF MINUTE OF PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE HELD ON 22 MAY 2024 
*4.    SIMPLIFIED PLANNING ZONES: PROPOSED CLOSURE OF PROJECT 
A report advising of the proposed closure of the Scottish Government Simplified Planning
Zones (SPZ) Pilot Project, which was being progressed jointly by Development Policy
(Planning and Regulatory Services) and Housing (Community and Culture) in association
with a private development on behalf of the Scottish Government, was considered. 
Argyll and Bute proposed a project for the pilot that consisted of a remote rural island
location (Mull) with a green field site in private control and a Main Town (Lochgilphead)
location on a brown field site in Council ownership.  Due to a range of issues it has
become unfeasible to progress the project to a successful conclusion. 
Decision 
The Committee agreed to: 
1. note and consider the information in the report; 
2. recommend to the Policy and Resources Committee, the closure of the project with the
return of unspent monies to the Scottish Government; and 
3. continue to support the development of the sites through the normal planning process,
utilising information gained during the project where possible. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 7 February 2024, submitted) 
Page 319 Agenda Item 17

Page 320

This page is intentionally left blank

Page 321

ARGYLL AND BUTE COUNCIL          PPSL COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH     22 MAY 2024 
SIMPLIFIED PLANNING ZONES: PROPOSED CLOSURE OF PROJECT 
1.0 EXECUTIVE SUMMARY
1.1 The purpose of this report is to advise PPSL of the proposed closure of the
Scottish Government Simplified Planning Zones (SPZ) Pilot Project, which was
being progressed jointly by Development Policy (Planning and Regulatory
Services) and Housing (Community and Culture) in association with a private
developer on behalf of the Scottish Government.
1.2 The Simplified Planning Zone project was brought to the PPSL Committee on
the 15th March 2017, which endorsed the principle of preparing an SPZ Scheme
for a site in Lochgilphead and another site on Mull. This was to investigate the
use of an SPZ Scheme to enable the delivery of self/custom build homes in
differing situations.
1.3 A number issues arose during the course of the project which have impacted
adversely on its delivery. These included issues relating to flooding, access,
sustainable development, market changes and changed economic and policy
environment. These issues mean that the feasibility of progressing a successful
SPZ Scheme is now unlikely. Therefore continuation with this approach is not
considered to be a practical solution. However, there still remains good
potential to develop both sites more effectively outwith this project through the
normal planning process, including for self/custom build homes. The option to
close the project was discussed with the Scottish Government. Given the
significant issues the Scottish Government would permit the closure of the
project. A requirement of closing the project would be the return of any unspent
grant money.
1.4 Recommendations 
It is recommended that the members of PPSL:
i) note and consider the information in the Report;
ii) recommend to the Policy and Resources Committee, the closure of the
project with the return of unspent monies to the Scottish Government;
and
iii) continue to support the development of the sites through the normal
planning process, utilising information gained during the project where
possible. 
Page 321

Page 322

ARGYLL AND BUTE COUNCIL                  PPSL COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH    22 MAY 2024 
SIMPLIFIED PLANNING ZONES: CLOSURE OF PROJECT 
2.0 INTRODUCTION 
2.1. The Scottish Government sought projects from local authorities to assist with a
pilot study into the use of the Simplified Planning Zone (SPZ) process. The aim
was to investigate the potential for an SPZ Scheme to assist in the delivery of
self/custom build housing. A Simplified Planning Zone is an area where the
need to apply for planning permission is removed for certain types of
development. 
2.2. Argyll and Bute proposed a project for the Scottish Government pilot that
consisted of a remote rural island location (Mull) with a green field site in private
control and a Main Town (Lochgilphead) location on a brown field site in Council
ownership. Due to a range of issues it has become unfeasible to progress the
project to a successful conclusion. The closure of the project would require the
remaining grant monies to be reimbursed to the Scottish Government. 
3.0 RECOMMENDATIONS 
3.1 Recommendations 
It is recommended that the members of PPSL:
i) note and consider the information in the Report;
ii) recommend to the Policy and Resources Committee, the closure of the
project with the return of unspent monies to the Scottish Government;
and
iii) continue to support the development of the sites through the normal
planning process, utilising information gained during the project where
possible.  
Page 322

Page 323

4.0 DETAIL 
4.1 An SPZ Scheme may be used to promote self/custom build housing delivery.
However, in the case of the 2 sites piloted within Argyll and Bute the issues
encountered during the progression of the scheme significantly reduced the
viability of the approach. 
4.2 The issues include:
• Flooding – full modelling of the Lochgilphead site highlighted issues that were
difficult to resolve within an SPZ Scheme.
• Access – constraints at Lochgilphead that may be better overcome using
land outwith the Scheme.
• Sustainable development – constraints resultant from a Scheme are liable
to reduce delivery capacity and result in a less effective use of a valuable
town centre site.
• Market changes – the Scheme is not easily amended and may constrain
development in changing market conditions.
• Changed economic and policy environment - the Scheme has experienced
significant delays related to the pandemic and SEPA cyber attack. There
are new options for the delivery of self build/custom housing with greater
policy support mechanisms. 
4.3 The benefits of having taken part in the pilot have been the raising of awareness
of self and custom build options with developers and communities, assisting in
developing national policy and technical survey work undertaken on the Council
owned Lochgilphead site. 
4.4 Both sites from the project can progress successfully without the use of an SPZ
Scheme. The Mull site is a designated housing allocation and the Lochgilphead
site is within a Main Town Centre near infrastructure and key facilities. 
5.0 CONCLUSION
5.1 The issues with the SPZ Scheme are such that the sites are not liable to achieve
their full potential through this approach. In addition, market conditions are subject
to change and it is considered that the SPZ Scheme is not as responsive to this
as the normal planning process. The recommended approach is to close the
project and support the delivery of the sites through the normal planning process. 
6.0 IMPLICATIONS
6.1 Policy – None 
6.2 Financial – Unused grant monies totalling £37,099.09 require to be returned to
the Scottish Government. 
Page 323

Page 324

6.3  Legal – There is a requirement to return unused grant monies to the Scottish
Government. 
6.4  HR - None
6.5  Fairer Scotland Duty: None 
6.5.1   Equalities - protected characteristics – None 
6.5.2   Socio-economic Duty – None 
6.5.3  Islands - None
6.6 Climate Change – None 
6.7 Risk – Failure to close the project would utilise additional resource on potentially
abortive work and is liable to result in a less effective route to delivery of
development on the project sites. 
6.8  Customer Service – None
6.9 The Rights of the Child (UNCRC) - None 
Kirsty Flanagan,
Executive Director with responsibility for Development and Economic Growth
Policy Lead Cllr Green
07/02/24                                                
For further information contact: 
Sybil Johnson 01546 604308 sybil.johnson@argyll-bute.gov.uk
Page 324

Page 325

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES
COMMITTEE
ROAD AND INFRASTRUCTURE
SERVICES 
15 AUGUST 2024 
OCTOBER 2023 WEATHER EVENT – UPDATE 
1.0 INTRODUCTION
1.1 This is a follow up to the report presented to Council on 25 April 2024 in
respect of the October 2023 weather event.  A number of projects have
become increasingly more complex as the full extent of the damage,
underlying ground conditions and a number of other factors have emerged. 
This report provides a detailed update on the various flood sites, provides
information relating to the estimated overspends within the various projects
and also proposes a range of measures for Members to consider which could
be used to cover the estimated overspends.   
2.0 RECOMMENDATIONS
2.1 It is recommended that the Policy and Resources Committee:- 
a. Note the updates on the works undertaken and completed and those that
are ongoing.
b. Notes the revised forecast overspend of £3.853m that is currently
unfunded. 
c. Approves that options 1, 2 and 3 as detailed in the table at paragraph
3.10 are used to fund the overspend and defer consideration of the
remainder of the overspend once the Crown Estate Funding and Place
Based Investment funding is confirmed for 2024-25.   
3.0 DETAIL
3.1 Following a period of unprecedented wet weather where there was a level of
rainfall that left ground conditions very wet and in many cases saturated, over a
months’ worth of rain fell over a 36 hour period starting Friday 6 October 2023
and running into Saturday 7 October 2023.  This was the wettest 2-day period on
record for Scotland since 1891 (MET Office report). Argyll and Bute was the worst
affected area as shown in the chart below: 
Page 325 Agenda Item 18a

Page 326

3.2 The works carried out following the rain event were extensive with dozens of
locations requiring attention from simple cleansing of a small drain to significant
landslides and bridge replacements. 
3.3 A significant amount of work has been undertaken and completed thus far. 
Some examples include: 
• Various bridges – Tree and debris clearance to minimise flood risk at Bridgend
Bridge, Upper Stronafian Bridge and Victoria Bridge (Cowal) and Glenmallon
Bridge and Lindowan Burn Bridge (Helensburgh & Lomond).  Confined space
inspections and clearance was also completed to reduce the flood risk at
structures in Helensburgh. 
• B828 Glenmore Bridge (Cowal) – Repairs to damaged parapets and training
walls caused landslide.  Works undertaken by internal Structures Maintenance
Team 
• B839 Lochgoilhead Bridge (Cowal) – Repairs to the scoured and exposed
bridge abutments and central pier foundations, reinstatement of erosion
protection along the riverbank and riverbed. Working with Ross MacArthur
Contractors to ensure bridge remained open to public and local community was
not shut off, especially given the closure of the nearby B828 road due to
landslips. 
• B828 Glenmore Road (Cowal) – Rock anchor repairs to rebuild eroded and
missing road edges and verges, damaged road culverts and road restrain
Page 326

Page 327

systems caused by landslip and rockfall. Working with Geo-Rope to completion,
the road was reopened following separate remedial works by Forestry and Land
Scotland to remove further risk of rockfall to users. 
• Ri Cruin Bridge – bridge abutment repair, scour protection works and invert
pitching repairs carried out in conjunction with DA MacDonald and the Council’s
Bridge Squad team. 
• A815 Landslip clearance to reopen the road in conjunction with the reopening
of the A83 as a vital route to and from Cowal.  This site is immediately adjacent
to the “Dunoon Road End Straights” section of the A83 beside the Rest and Be
Thankful and ongoing monitoring of this site continues. 
3.4 The following table summarises locations where works are still outstanding. 
The most significant area of work relates to the A816, Kintraw, Ardfern landslide
and further information on this is also provided within Appendix A.  Further
information relating to the financial estimates is included within the table at
paragraph 3.6. 
LOCATION ONGOING WORKS SCHEDULED
COMPLETION
A816-110
Cuilfail Hotel
Bridge,
Kilmelford  
Following severe damage, this bridge was
immediately closed to traffic, demolished, a
new structure installed and reopened to traffic
in under two weeks. 
Hydrological, Bathymetric & Ecological
Studies are now nearing completion alongside
consultations with SEPA. 
Ongoing designs of rock armour, bridge
parapet, bridge training walls and narrow
footway on the upstream side of the bridge. 
Contract award for the above described
Phase 2 works was made after the Council’s
Bellwin claim in February 2024 and are higher
than the figure which was included in the
claim.    
Site works due to re-
start mid August
2024 aiming to be
complete before
winter. 
B844-010
Kilninver
Bridge 
Phase 1 emergency works to protect the
bridge and the B844 road completed
November 2023. 
Previously proposed Phase 2 designs and
works (scour protection) now being
incorporated into Local Bridge Maintenance
Fund scheme.  Designs being carried out in-
house with a view to works being tendered
mid 2025.  Any risks incurred from the delays
to the Phase 2 works are being monitored and
controlled to ensure the road network remains
safe.  
Late Summer 2026 
Page 327

Page 328

C30 Ford to
Malevich  
Works completed and road fully reopened.  
As the emergency works progressed, rock
was found to be much deeper than
anticipated, costs to secure engineering
solution to rock were therefore higher than
previous estimates.    
July 2024 
B836-060
Balliemore
Bridge, Glen
Lean 
Following severe damage to and partial
collapse of existing bridge, a temporary bridge
and associated road alignment was installed
in under 2 months, with the alternative route
opening on 1st December 2023. 
Next steps are construction of a new,
permanent bridge and removal of the
temporary structure. 
The Council’s attempts to seek engagement
from OpenReach to remove their apparatus
from within the bridge to allow the bridge to be
demolished are ongoing.  At this stage it
appears that OpenReach will charge the
Council circa £230k for this and their works
will take around 2 months.  This will also
require an extended hire period for the
temporary bridge.    
Late 2024 / Early
2025 
A816 Bealach
Mor, Kintraw,
Ardfern catch
pits at base of
unstable
slope  
Licence To Occupy discussions are still
ongoing between the Council and the
Landowner. 
Works along the toe of the slope have been
reviewed and at this time further landslip and
rockfall events are within a predictable
pattern, however, further significant landslides
could occur at this location.
We are now studying the option of installing
rockfall protection barriers within the road
corridor, which would no longer require catch
pits and fencing as previously proposed. 
Further information (including budget costs) is
described in more detail in Appendix A.  
See Appendix A for
timescales  
A816 Bealach
Mor, Kintraw,
Ardfern convoy
system ‘v’ fixed
traffic lights 
Road Safety Audit has been progressed and
identified some amendments to the road
layout, these have been incorporated into the
proposed works detailed later in this report.  
Hard wired traffic lights being designed for
installation in due course. 
Further information (including budget costs) is
described in more detail in Appendix A.  
End of September
2024 
A816 Bealach
Mor, Kintraw,
Ardfern –
permanent
diversion onto
Archaeologist has carried out further
investigative works and have given positive
feedback. The next stage is further design
work including ground investigation,
environmental impact assessment and
3 – 5 years  
Page 328

Page 329

a widened
alignment of
the emergency
route   
additional archaeological matters which will
allow for permissions to be sought and a final
design progressed for a permanent solution. 
A new, separate contract is being progressed
for this element of permanent works as a
scope for these will be able to be developed
and prepared by the Council in advance. 
Cost options are being worked up, further
information will be included in the next
update.   
Update to the Financial Estimates 
3.5 The report to Council in April advised that the estimated costs related to the
weather incident amounted to £10.543m.  A claim amounting to £5.494m of
revenue costs was submitted to Scottish Government at the end of the 4
month period and after deducting our threshold of £0.529m this results in a
net claim of £4.965m – £4.353m of this has been received with the final
£0.612m outstanding from Scottish Government whilst final checks are being
made.  The Council secured a further £2.3m of funding as part of the budget
negotiations and the remainder was funded by either Council reserves or
borrowing as part of the budget agreed in February 2024.   
3.6 A number of projects have become increasingly more complex as the full
extent of the damage, underlying ground conditions and a number of other
factors have emerged and as a result costs have increased to those
estimated in the report to Council in April 2024.   The table below details the
revised estimates and the increase in cost that is not currently budgeted for
along with reasons for the increase. 
Scheme  Feb 2024 
Estimate 
£000 
Movement
Between
Interim
and Final
Bellwin
Claim
£000
Total
Funded
Position
£000
July 2024
Updated
Estimate
£000
Increase
from
Funded
Position
£000
Reasons for Increase
B836-060
Balliemore
Bridge (Glen
Lean) –
Revenue 
752  (57) 695 1,150 455  Due to the nature of the extreme
weather event damage to
Balliemore Bridge, and following
consultation with other Scottish
Councils, it was anticipated that
notifying OpenReach that the bridge
was damaged beyond repair that
they would divert their apparatus at
their own cost to protect their
infrastructure.  OpenReach have not
been in agreement with this and
have insisted that the Council pay to
divert and reinstate the apparatus in
accordance with regular NRSWA
Page 329

Page 330

Legislation processes.  Current legal
advice is to progress this route. 
Feb 24 estimate did not include
diversion of OpenReach apparatus
(£230k) and associated costs for
delays to phase 2 works due to
OpenReach diversion including
extended hire of temporary bridge
(at a higher weekly rate, circa
£100k), traffic management,
inspections and management (circa
£125k) until new, permanent bridge
is constructed late 24 / early 25. 
B836-060
Balliemore
Bridge (Glen
Lean) –
Capital 
1,448  0 1,448 1,448 0 n/a
A816
Bealach Mor
(Ardfern /
Kintraw)
Landslip –
Revenue 
2,809 94  2,903 5,155 2,252 Previously proposed Catchpit &
Bund, estimated at a cost of
£1.35m, was not included in Bellwin
Claim in Feb 2024. 
Land access delays have incurred
additional costs for traffic
management, project management,
maintenance & ongoing stabilisation
of current works, standing time. 
Roads Safety Audit has now been
concluded and recommends
additional safety measures which
will allow the removal of the traffic
management convoy arrangement
to reduce long term costs. 
Installation of these measures along
with the traffic light system will incur
additional costs in the short term. 
A816
Bealach Mor
(Ardfern /
Kintraw)
Landslip –
Capital
scheme for
long term,
permanent
realignment 
1,100 0  1,100 1,100 0 n/a
C030
Kilmaha
Landslip -
Revenue 
315  83  398 864 466 Rock head found much deeper than
anticipated - requiring redesigns for
longer and additional anchors,
support beams and higher spec
mesh. 
Weather and material delivery
delays. 
Page 330

Page 331

Higher tonnage of rock armour from
earlier scheme on site than reported
/ estimated. 
Vehicle Barriers now included due
to the significant difference in level
exposed by the new arrangement. 
U014
Scammadale
Landslip -
Revenue 
454  (83)  371 838 467 Rock head found much deeper than
anticipated - requiring redesigns for
longer and additional anchors,
support beams and higher spec
mesh. 
Weather and material delivery
delays. 
Assistance to residents and
businesses as this lifeline cul-de-sac
road could not be fully closed. 
Vehicle Barriers now included due
to the significant difference in level
exposed by the new arrangement. 
A816-110
Cuilfail Hotel
Bridge,
Kilmelford –
Revenue
Emergency
Response 
200  0  200 200 0 n/a
A816-110
Cuilfail Hotel
Bridge,
Kilmelford –
Permanent
Capital 
1,800 0 1,800 2,086 286 Contract cost for Phase 2 works
confirmed after Bellwin claim.  This
also now include rock armour to
protect upstream and downstream
embankment protection. 
These capital works were not
eligible for Bellwin scheme. 
Other
Revenue
Schemes 
1,665 102 1,767  1,694 (73)  This line captures the following: 
Bridge Debris Clearances 
Lochgoilhead Bridge Repairs 
Roads Workers time and materials
for all repairs and flood works they
carried out 
Costs came in lower thanks to
emergency response works at Ri
Cruin Bridge being suffice and
removing the need for further works
during the summer as was initially
forecast.
Revenue
Totals 
6,195 139  6,334  9,901  3,567  
Page 331

Page 332

Capital
Totals 
4,348  0  4,348 4,634 286 
Overall
Weather
Event
Totals 
10,543 139 10,682 14,535  3,853 
Next Steps 
3.7 Our current focus is to complete the various works still outstanding and to
continue to monitor slopes where debris flows may affect the road network.
Current status, options and associated cost estimates (including
substantiation of costs which have gone over the original estimates made at
the time of the Council’s Bellwin claim) for the ongoing schemes.   
3.8 Climate change is a significant challenge to the Council for a number of
reasons but not least it is a challenge for the road and transport infrastructure.
This report highlights the challenges from the October weather incident and
the report in April highlighted some of the challenges faced over the last
decade or so.  The road and wider transport system provides the economic
backbone for our communities. We need to have infrastructure which is fit for
purpose and sufficiently resilient to withstand the increasing weather
challenges we are experiencing which are linked closely to climate change.
The building of a bypass on the A816, strengthening bridges, and modifying
roadside ditches are all adaptations being progressed to better accommodate
some of the climate changes we are seeing. However, more will be needed
and whilst the works mentioned above will increase our infrastructure
resilience to future weather events, the network overall is fragile and unable to
cope with significant weather events.   
3.9 It will be necessary to see more infrastructure investment put in place to
enable climate change adaptations to be made. The level of investment will
be significant, and the Council will need to consider how its funding can be
assembled and what lobbying can be progressed with Scottish and UK
Governments. 
Options to be considered to fund overspend 
3.10 The revised estimates give rise to a £3.853m overspend that will require to be
funded.  The Council’s current unallocated General Fund Balance (not taking
into account other overspends that are reported in the budget monitoring
pack) is £2.259m.  This overspend would therefore mean the Council would
have to use the General Fund contingency and a recovery plan would require
to be put in place to bring the General Fund out of contingency.  A number of
options have been outlined below that could fund the forecast overspend.   
No. Options Amount
£000
Comment/Implications
1 Pause previously
approved Roads
2,029 This will impact on the
condition of the road network
Page 332

Page 333

Reconstruction Schemes
(see detail in Appendix B)
and with much reduced
capital block for next year
there is no guarantee that the
previously programmed
schemes will be able to be
progressed.  Unclear as to the
impact of Roads Condition
Index (RCI) but likely not to
be positive.  
2 Use £50k revenue within
loans fund street lighting
improvements for
prudential borrowing, this
could raise £750k of
funding.
780 Will reduce the number of
column replacements and
lighting cable repairs
impacting on the resilience of
the lighting network.
3 Utilise some of the
unallocated capital
funding for street lighting
cable and column
replacements
100 Will reduce the number of
column replacements and
lighting cable repairs
impacting on the resilience of
the lighting network. 
Sub-Total 2,909 
Balance from one of the
following:  
4 Use Crown Estate and
Place Based Investment
Funding to fund the
remaining balance
944 
OR
This would limit the
opportunities to use this
funding for other projects
across the Council area. 
Funding has not been
confirmed for either schemes
for 2024-25 yet. 
5 Use Unallocated General
Fund Reserves
944 
OR
This would reduce the level of
unallocated General Fund
reserves significantly and
based on the other
overspends currently being
reported (see separate
budget pack report) this would
reduce the unallocated
General Fund to £0.214m.  
6 Reallocate capital funding
set aside for the waste
transfer station and use
prudential borrowing to
fund waste transfer
station (this would have a
revenue implication
944 This will cost £0.061m in
recurring revenue expenditure
that will need to be added to
the loans fund. 
3.11 It is recommended that the Policy and Resources Committee agree to Options
1-3 in the table above that will fund £2.909m of the overspend.  The remainder
of the overspend could be considered later in the financial year once the Crown
Page 333

Page 334

Estate Funding and Place Based Investment funding is confirmed for 2024-25.   
4.0 CONCLUSION
4.1 This report summarises and provides update on the works that have been
undertaken and completed and those that are ongoing in relation to the extreme
weather event which occurred on the weekend of 7 October 2023 and which
was the wettest 2-day period on record for Scotland since 1891 in which Argyll
and Bute was the worst affected area.   
4.2 The report also provides an update on the cost estimates and these give rise to
£3.853m overspend that will require to be funded.  A number of options to fund
the overspend have been outlined within the report.     
5.0 IMPLICATIONS 
5.1 Policy – policies in place for climate change, coast protection etc where
applicable these policies are being worked to.
5.2 Financial – new costs pressures have no identified funds to respond to the
infrastructure damage. A Bellwin claim was progressed for eligible costs up to
February 2024.  Works not eligible for Bellwin will need to be funded, with
previous estimates receiving funding following an earlier report and additional
funding requirements now identified within this report.   
5.3  Legal – various land agreements necessary for individual locations.   
5.4  HR – none known.
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – none known. 
5.5.2   Socio-economic Duty – none known. 
5.5.3  Islands – none known.
5.6 Climate Change – the impact of the storm is very closely linked to climate
change and the October event has highlighted to need for further adaptation
to be made to infrastructure to increase our resilience to future weather
events. The level of investment to improve resilience is expected to be
significant.  
5.7 Risk – significant risk of similar future events impacting our infrastructure.  
5.8  Customer Service – none known.  
5.9 Rights of the Child (UNCRC) – investment to improve our road network will
contribute to a safer environment for young people to thrive in. 
Page 334

Page 335

APPENDICES: 
Appendix A – A816 Bealach Mor (Ardfern/Kintraw) Landslip
Appendix B – Roads Reconstruction Schemes proposed to be paused 
Kirsty Flanagan, Executive Director with responsibility for Roads and
Infrastructure Services 
Councillor John Armour, Policy Lead for Roads, Transport and Amenity
Services 
5 August 2024 
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Service
Jim.Smith@argyll-bute.gov.uk 
Page 335

Page 336

This page is intentionally left blank

Page 337

Document is Restricted
Page 337 Agenda Item 18bNOT FOR PUBLICATION by virtue of paragraph(s) 6, 9
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 338

This page is intentionally left blank

Page 339

APPENDIX B - ROADS RECONSTRUCTION SCHEMES PROPOSED TO BE
PAUSED    
MAKI   
B8002  Ardfern to Craignish (4 sites = 1815 Lin.m)   £136,655 
2025 Pre-SD Isle of Gigha (whole network)  £66,667 
A847 Bruach Gorm to Sewage Works - Pt Charlotte  £217,497 
Uc10 North of Ardnahoe  £39,450 
A847 Gowanlea to Seaview - Bruichladdich 700linm  £44,455 
Total  £504,724 
OLI   
U25 Musdale Road  £70,172 
U14 Scammadale Road  £66,967 
U48 Shore Street - Oban  £79,691 
B845 - Glen Salach (Blarcreen & Summit)  £53,349 
U58 Lower Gylen to Little Horse Shoe Bay KERRERA  £104,435 
U82  Leiter Rd  £24,173 
C 54  Loch Buie Rd   £72,159 
U16 Croggan Road  £75,022 
U14 Grasspoint  £63,209 
B8035 Gruline North - Mull  £63,138 
B8035 Gruline South - Mull  £61,252 
U80 Java Road   £19,466 
Total  £753,033 
B&C   
U27 Millhouse  /  U19 Couston   £80,000 
B839 / B828 Passing Place improvements  £56,000 
C1 Bruchag Road  £50,000 
A844   East Princess St & Battery place to Glenburn  rd  £111,000 
U58  Serpentine Rd - to B881 Bishop St  £24,000 
U39 /U69  Gowanfield Place to St Brides Rd  £80,000 
Glenburn Rd   £35,000 
Total  £436,000 
H&L   
U71 Colqhoun St   W Argyle St - W King St  £34,000 
U72 Columba St - Helensburgh  £23,000 
U 306 Victoria Road - Helensburgh   £68,000 
U105 East Prices St Henry Bell St - Geo St  £132,000 
Page 345 Agenda Item 18c

Page 340

U62  Church Road - Rhu  £43,000 
U101 East King - Charlotte St to Grant St  £36,000 
Total  £336,000 
Page 346

Page 341

Document is Restricted
Page 347 Agenda Item 19NOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 342

This page is intentionally left blank

Page 343

Document is Restricted
Page 355
NOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 344

This page is intentionally left blank

Page 345

Document is Restricted
Page 359
NOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 346

This page is intentionally left blank

Page 347

Document is Restricted
Page 365
NOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 348

This page is intentionally left blank

Page 349

Document is Restricted
Page 373
NOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 350

This page is intentionally left blank

Page 351

Policy and Resources Committee Work Plan 2024-2025
This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. 
Date Report Title Dept/Section How Often? Date Due Comments 
15 August 2024 Financial Report Monitoring Pack  Financial Services Every meeting
except May
16 July 2024 
Budget Outlook Financial Services 
Education Network Transformation
Programme
Education /
Customer Support
Services   
Corporate Debt Recovery
Policy/Sundy Debt Procedure
Manual
Financial Services   
National Care Service: Stage 2
Scrutiny: Call for Views
Legal and
Regulatory Support   
Redirection Of Crown Estates
Funding
Development and
Economic Growth   
UKSPF Update Development and
Economic Growth   
Islands Programme Development and
Economic Growth   
RGD Update and further request of
drawdown
Development and
Economic Growth   
Islands Cost Crisis Emergency
Funding
Development and
Economic Growth   
October 2023 Weather Event –
Update
Roads and
Infrastructure
Services   
Data Strategy and Action Plan Customer Support
Services   
Page 381
Agenda Item
20

Page 352

Policy and Resources Committee Work Plan 2024-2025
This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. 
Community Empowerment
(Scotland) Act 2015 – Update on
Expressions of Interest / Asset
Transfer Requests 
Commercial
Services   
Helensburgh Waterfront Update –
Appointment Of Preferred Bidder                
Commercial
Services   
Council Carbon Emissions 2022/2023 Commercial
Services   
Climate Change Board Update Commercial
Services   
Simplified Planning Zones: Proposed
Closure Of Project 
Development and
Economic Growth  
Recommendation from Planning,
Protective Services and
Licensing Committee held on 22
May 2024
Date Report Title Dept/Section How Often? Date Due Comments 
10 October 2024 Financial Report Monitoring Pack  Financial Services  10 September 2024 
7. Budget Outlook
8. 
Financial Services   
9. Volunteer Policy Customer Support
Services   
Date Report Title Dept/Section How Often? Date Due Comments 
5 December
2024
Financial Report Monitoring Pack  Financial Services  5 November 2024 
10. Budget Outlook
11. 
Financial Services   
12. Budget Update 2025/26
13. 
Financial Services   
Page 382

Page 353

Policy and Resources Committee Work Plan 2024-2025
This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. 
14. Annual Review of Procurement
Strategy and Sustainable
Procurement Policy
15. 
Legal and
Regulatory Support   
Date 16. Report Title Dept/Section How Often? Date Due Comments 
13 February
2025
Financial Report Monitoring Pack
17. 
Financial Services Every meeting
except May
14 January 2025 
18. Budget 2024-2025 Financial Services 
19. Treasury Management Strategy and
Investment Strategy 
Financial Services 
Date 20. Report Title Dept/Section How Often? Date Due Comments 
8 May 2025 21. Budget Outlook
22. 
Financial Services  8 April 2025 
Future Items – Date to be determined. 
Key Performance Indicators FQ2 –
2022/2023 – changing to Corporate
Outcome Indicators
Customer Support
Services
Annual   
Historic Environment Scotland
Heritage and Place Programme –
Opportunity for Place Based
Heritage Funding
Development and
Economic Growth   
UK Shared Prosperity Fund – Argyll
and Bute Investment Plan
Development and
Economic Growth  
Regular updates to be provided. 
Agreed 11.08.2022 
Rothesay Pavilion - Rural Growth
Deal 
Development and
Economic Growth 
Update to be provided following
approval of the Rural Growth
Page 383

Page 354

Policy and Resources Committee Work Plan 2024-2025 
This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. 
Deal Full Business Case by the
UK and Scottish Government. 
Single Authority Model Update    07.12.23 Agreed further report to
be provided following the
completion of work to articulate
the benefits and key objectives
associated with each option. 
Lorn Arc TIF Programme - Oban
Airport Business Park – Outline
Business Case
Commercial
Services /
Development and
Economic Growth  
09.05.24 Agreed further report to
be provided with Business Case.
Page 384