ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 15 AUGUST 2024
FINANCIAL REPORTS MONITORING PACK – 30 JUNE 2024  
1. INTRODUCTION 
1.1 This report provides a summary of the financial monitoring reports as at the end of
June 2024. There are five detailed reports, setting out the position as at 30 June
2024, which are summarised in this Executive Summary: 
• Revenue Budget Monitoring Report 
• Monitoring of Financial Risks 
• Capital Plan Monitoring Report 
• Treasury Monitoring Report
• Reserves and Balances 
2. DETAIL 
2.1 Revenue Budget Monitoring Report 
2.1.1 This report provides a summary of the current revenue budget monitoring position to
ensure net expenditure is contained within budget.  It provides corporate and
departmental information with comparisons on a forecast outturn and a year to date
basis. 
2.1.2  There is a forecast overspend of £4.658m as at the end of June 2024.  The
variances are:
- The pressure resulting from the October 2023 weather event of £3.567m.  A
separate report within this pack provides Members with further information.  
- Within Social Work, a forecast overspend of £0.648m relating to demand for
residential placements within Children and Families Services.
- Within Roads and Infrastructure Services, a forecast overspend of £0.500m
relating to new bus contracts for Public and Pupil Transport across Argyll and
Bute.  Note that since the end of June, a further pressure of £0.210m in
relation to bus contracts has been identified as more contracts are renewed,
therefore in the next reporting period the overspend relating to bus contracts
will increase from £0.500m to £0.710m.  
- Within Central Budgets, a forecast overspend of £0.271m is reported in
relation to the inflation on insurance being higher than estimated.
- Within Funding, an over-recovery of Council Tax income on second homes of
£0.328m. 
2.1.3  There is a year to date overspend of £1.140m.  More focus is on the forecast outturn
position, hence why sometimes the year to date position is not updated.  The year to
date variances mainly relate to the timing of income and expenditure and recharging
of costs to capital.

Page 2

2.1.4 Total policy savings relevant to 2024-25 financial year amount to £6.467m.  The
table below outlines their progress as at 30 June 2024.   
Category No. of
Options
2024-25
£000
2024-
25
FTE
2025-26
£000
2025-
26
FTE
Future
Years
£000
Future
Years
FTE
Delivered 4 5,371.0 0.0 5,538.0 0.0 5,538.0 0.0
On Track to be
Delivered 8 965.0 14.9 846.0 14.9 846.0 14.9
Still to be
Implemented 1 0.5 0.0 0.5 0.0 0.5 0.0
Being Developed 0 0.0 0.0 0.0 0.0 0.0 0.0
Will not be achieved 1 100.0 0.0 150.0 0.0 150.0 0.0
Potential Shortfall 1 30.0 0.0 30.0 0.0 30.0 0.0
Delayed 0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 15 6,466.5 14.9 6,564.5 14.9 6,564.5 14.9 
2.1.5 One saving is categorised as potential shortfall and one will not be achieved.   
Health and Social Care Partnership (HSCP) – Financial Update 
2.1.6 The forecast outturn position at the end of June is an estimated overspend of
£1.176m for 2024-25 (£0.648m overspend for Social Work and £0.528m for Health).
The HSCP’s financial position will continue to be monitored and Financial Services
staff will engage with the HSCP Chief Financial Officer to ensure that mitigation
actions are in place to address the deficit and ensure that no additional funding is
required from the Council. 
2.2 Monitoring of Financial Risks 
2.2.1  This report outlines the process and approach developed in carrying out a financial
risks analysis and provides an update on the current assessment of financial risks.   
2.2.2 There are 7 Council wide revenue risks identified for 2024-25 currently amounting to
£3.592m.   
2.2.3 There are currently 42 departmental risks totalling £5.580m.  Of the 42 departmental
risks, 5 are categorised as likely.  These will continue to be monitored and action
taken to mitigate or manage these risks.   
2.2.4 The current top three risks in terms of the financial impact are noted in the table
below.

Page 3

SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance -
Bridges,
Culverts & Sea
Defences
Extreme localised weather
may result in loss of bridge,
culvert, road or sea defence.
3 750
Roads and
Infrastructure
Services
Waste PPP -
Indexation
Historical payments made
towards Waste PPP based
on indexation rates have
been challenged by Renewi
resulting in a potential cost
to the council.
3 586
Financial
Services
Council Tax
Debt Collection
Recovery
Recovery of debt becomes
more difficult to pursue in the
current economic
climate.  This is in relation to
historical debt that has
accumulated over many
years therefore any adverse
collection rates will impact
on the year end debt
provision as opposed to the
in-year financial position,
hence no forecast variance
has been reported within the
current year.
3 345 
2.2.5 
2.2.6
There have been 5 changes to the departmental risks since the report as presented
to the Council on 22 February 2024.  These are outlined in paragraph 3.4.1 of the
Financial Risks Report. 
Three other potential risks relating to funded childcare for 1 and 2 year olds, the
proposed new school campus on Mull and digital access for learners are covered in
section 3.6 of the Financial Risks report.   
2.3 Capital Plan Monitoring Report 
2.3.1 This report provides a summary of the current capital plan monitoring position. 
Information is provided in terms of monitoring year to date budget, current full year
budget, future years total budget and funding and non-financial in terms of project
performance.

Page 4

2.3.2 In recent years, the Council has agreed additional funding for the capital programme
totalling £11.100m to address specific costs related to dealing with COVID,
inflationary pressures arising as a consequence of the factors detailed in paragraph
2.3.3 below and other cost pressures on the capital plan. To date, £8.834m has
been allocated to projects leaving a balance of £2.266m available for allocation as
required. 
2.3.3 The capital programme continues to see significant price increases as well as
disruptions to the supply chain and longer lead in times. The increased rate of
inflation impacts costs such as energy prices, labour, packaging and transport.
These all have an effect on the overall contract price and make it extremely
challenging to manage expenditure and the availability of supply. As a result of this it
should be noted that there are likely to be other significant financial impacts which
are not quantifiable at this stage. 
2.3.4 Actual net expenditure to date is £4.869m compared to a budget for the year to date
of £4.814m giving rise to an overspend for the year to date of £0.055m (1.14%).  
2.3.5 The forecast outturn for 2024-25 is a forecast net expenditure of £37.565m
compared to an annual budget of £37.132m giving rise to a forecast overspend for
the year of £0.433m (1.17%). 
2.3.6 The forecast total net projects costs on the capital plan are £206.634m compared to
a total budget for all projects of £206.634m giving rise to a forecast overspend for
the overall capital plan of £0.433m (0.21%).  
2.3.7 In respect of total project performance, there are 172 projects within the capital plan,
166 are complete or on target, 5 are off target and recoverable and one project is off
track.  
2.4 Treasury Monitoring Report 
2.4.1 This report provides information on the current levels and recent transactions in
relation to the capital financing limit, total borrowing, temporary borrowing and long
term borrowing and investments.   
2.4.2 The net movement in external borrowing for the period 1 April 2024 to 30 June 2024
was a decrease of £5.7m. 
2.4.3 Borrowing is below the Capital Financing Requirement for the period to 30 June
2024, at this stage in the financial year capital expenditure is below target. 
2.4.4 The levels of investments were £59.638m at 30 June 2024. The average rate of
return achieved was 5.276% which is above the target SONIA (Sterling Overnight
Index Average) rate for the same period of 5.200%.

Page 5

2.5 Reserves and Balances 
2.5.1 This report summarises the overall level of reserves and balances and monitors the
spending of the earmarked reserves, providing detailed information on the unspent
budget earmarked balances.   
2.5.2 The Council has a total of £689.113m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
2.5.3 At 31 March 2024, the Council had a total of £121.701m of usable reserves.  Of this: 
• £2.763m relates to the Repairs and Renewals Fund
• £3.197m relates to Capital Funds
• £115.741m was held in the General Fund, with £107.443m of this balance
earmarked for specific purposes. 
2.5.4  At the budget setting meeting on 22 February 2024, as part of the revenue budget,
Council agreed to the transfer Strathclyde Pension Fund contribution savings of
£6.875m relating to Council staff and £3.053m relating to Social Work staff to
reserves.  It was also agreed that £1.875m of revenue surplus within 2024-25 be
transferred to the Capital Plan.  As the commitments for these include expenditure
within 2024-25 year, these have been immediately recognised within the earmarked
reserves balances to allow them to be spent accordingly.  This results in a total in-
year earmarked balance of £119.246m.
2.5.5 Of the earmarked balance of £119.246m:
• £60.078m is invested or committed for major initiatives/capital projects 
• £28.359m is still to be drawn down in 2024-25
• £30.809m is planned to be spent in future years 
2.5.6 The table below summarises the position of the unallocated General Fund balance. 
Further explanation of the figures can be found at Section 3.4 of the Reserves and
Balances report.  
Heading Detail £000
Unallocated General Fund
as at 31 March 2024
This is the balance that is
unallocated over and above the 2%
contingency, which amounts to
£6.039m
2,259
Current Forecast Outturn
for 2024-25 as at 30 June
2024
Per paragraph 3.4.2.  (4,658)
Social Work outturn
adjustment
Per paragraph 3.4.3 - Social Work
would expect to transfer any surplus
to internal IJB reserves
648

Page 6

Sub-total – potential
unallocated balance as
at 31 March 2025
*If no separate action is taken
regarding the weather event
overspend, the unallocated
general fund balance would fall
below 0
(1,751)
Options to pay for weather
related incident
Members have been presented with
options to cover the pressures
resulting from the weather incident
3,567
Estimated Unallocated
balance as at 31 March
2025 
1,816 
* If Members do not agree to the options outlined in the separate report and the
unallocated general fund balance falls below the amount available and moves into
contingency then a recovery plan would be required to bring the contingency level
back up to the agreed amount. 
2.5.6 It can be seen that, after taking into consideration the current forecast outturn for
2024-25 and assuming Members agree to the proposed actions regarding the
weather event, is estimated to have a £1.816m surplus over contingency. 
2.6 VIREMENTS OVER £0.200m (Revenue) 
2.6.1 Virement is the process of transferring budget between cost centres, services or
departments or between capital projects.  The Council’s constitution notes that
virements over £0.200m require approval by Council.  This section of the report will
be used to outline revenue virements in the period that require approval.   Capital
virements are included within the capital monitoring report. 
2.6.2 For the period April to June, there are no virements requiring authorisation: 
2.6.3 There is one virement relating to 2023-24 that requires authorisation.  This virement
was completed late in the year end process therefore did not appear on the report to
Council on 25 June 2024.  It is:   
- £0.288m from Education to reserves to recognise the Capital Items
Replacement Fund (the repairs and renewals fund that schools have access
to). 
3.  RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee: 
a) Consider the revenue budget monitoring report as at 30 June 2024.

Page 7

b) Note the financial risks for 2024-25. 
c) Note the capital plan monitoring report as at 30 June 2024 and approve the
proposed changes to the capital plan outlined in Appendix 4 of that report. 
d) Note the treasury monitoring report as at 30 June 2024. 
e) Consider the reserves and balances report as at 30 June 2024.  
f) Note that there were no revenue virements over £0.200m between April and
June 2024. 
g) Recommend to Council that the revenue budget virement over £0.200m
outstanding from 2023-24 is approved, per paragraph 2.6.3. 
4. IMPLICATIONS 
4.1 Policy – None.
4.2 Financial -  Outlines the revenue and capital monitoring
for 2024-25 as at 30 June 2024
4.3 Legal -  None.
4.4 HR -  None.
4.5 Fairer Scotland Duty -   None.
4.5.1 Equalities – protected
characteristics - 
None.
4.5.2 Socio-economic Duty -  None.
4.5.3 Islands -  None.
4.6 Climate Change - None.
4.7 Risk -  Risks are included in financial risks report. 
4.8 Customer Service -  None. 
4.9 The Rights of the Child (UNCRC) -  None. 
Kirsty Flanagan
Executive Director /Section 95 Officer
6 August 2024 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 8

REVENUE BUDGET MONITORING REPORT AS AT 30 JUNE 2024 POLICY AND RESOURCES COMMITTEE
15 AUGUST 2024 
2024-25 Overall Position:
There is a forecast overspend of £4.658m as at the end of June 2024.  The pressure relating to the October 2023 Weather Event has been
quantified and is a £3.567m overspend against revenue budgets.  A separate report on this agenda provides Members with further detail. 
Within Social Work, there is a forecast overspend of £0.648m relating to demand for residential placements within Children and Families
Services.  Within Executive Director Kirsty Flanagan, there is a forecast overspend of £0.500m due to the cost of new Bus Contracts for Public
and Pupil Transport across Argyll and Bute.  Note that since the end of June, a further pressure of £0.210m in relation to bus contracts has
been identified as more contracts are renewed therefore in the next reporting period, the forecast overspend relating to bus contracts will
increase from £0.500m to £0.710m.  Within Central Budgets, an overspend of £0.271m is reported in relation to the inflation on insurance
being higher than estimated.  Within funding, there is a projected over-recovery of income for Council Tax on 2nd Homes of £0.328m. 
There is a year to date overspend of £1.140m.  The year to date variances within the departments tend to relate to the timing of income and
expenditure and costs to capital not recharged yet. 
Key Highlights as at June 2024:  
• Council services are projecting an overspend of £4.658m as at 30 June 2024.  It is early in the budget monitoring process and
projections will be refined as the year progresses.  In the separate report regarding the Weather Incident, Members have been provided
with options to consider to cover the estimated overspends.
• Negotiations regarding the 2024-25 pay award are ongoing therefore salary costs are currently understated and the impact on the
forecast outturn position of any increase beyond the 3% already built into the budget cannot be quantified at this stage. 
Key Financial Successes:
Performance against budget for 2023-24 was an overall net favourable position of £1.728m underspend after adjusting for year-end
earmarking.  This breaks down as:
• £1.037m net overspend in relation to Council expenditure (excluding loans fund)
• £0.033m over-recovery of Council Tax income
• £5.932m underspend from the Loans Fund due to a higher return on investments than in the previous year, limiting new borrowing by
utilising cash balances instead, slippage within the capital programme and a one-off treasury gain as a result of a discount on the early
repayment of loans
• £3.200m of new unspent budget earmarkings

Page 9

Key Financial Challenges: Proposed Actions to address Financial Challenges:
Addressing service demand/expectation and the increasing challenges
facing departments across the Council in relation to the recruitment and
retention of suitably qualified and experienced staff.
Engagement and monitoring of both issues with departments to
assess how these challenges are affecting service capacity and
capability, staff attendance, utilisation of agency staff and costs.
Collaboration with services and other back-office teams to consider
and develop mitigating actions.
Achieving a favourable year-end position and achieving savings targets
in light of council wide risks to expenditure. 
Robust monitoring of the financial position and delivery of savings to
ensure budget issues inform the budget monitoring process.
Monitoring Social Work expenditure and more widely the IJB position as
any overspend will transfer back to partner bodies in the first instance.  
Continue to work closely with the CFO of the IJB to ensure that early
indication of any potential adverse financial outturn is identified and
corrective action is agreed as appropriate to reduce the risk to the
Council. 
Identifying further savings and delivering services more efficiently with
less resources, as whilst a balanced 2024-25 budget was agreed in
February 2024 there are still significant budget gaps in future years.
The Council will continue to progress savings options identified,
refine options that require further development and seek to identify
further savings through themed reviews and business process
reviews. A longer term approach is being explored with the intention
to develop a pipeline of savings that can be delivered over a number
of years.
Maintaining or improving the level of service income recovered, for
example planning, building standards and car parking.  
Actively monitor income recovery and ensure Council fees and
charges policies are regularly reviewed. 
Managing spend in service areas which are demand led and, to some
extent, outwith service control, for example Winter Maintenance. 
Use a risk-based approach to budget monitoring to focus additional
attention on these areas.
Ongoing requirement to fund unavoidable inflationary increases in areas
like utility costs, fuel, food etc. 
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be evaluated and reported through the
budget monitoring and preparation processes. 
Cost of living crisis impacting on pay inflation negotiations which could
result in pay awards above what is deemed affordable.
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be evaluated and reported through the
budget monitoring and preparation processes.
Future ongoing impact on revenue budgets as a result of the delivery of
substantial capital projects such as Rothesay Pavilion and a new school
on Mull.
Ensure costs are identified and reported on early in the process so
Members are aware of the ongoing financial impact to budgets.
Monitor and report on these regularly as part of the routine budget
monitoring once the projects are complete.
Delivery of climate change measures which can be costly and result in
overspends.
The Council will look at financially sustainable options and closely
monitor the impact of these on the budget position.

Page 10

Forecast Outturn Position
There is a forecast underspend of £4.658m for 2024-25 as at 30 June 2024.
Department
Annual
Budget   
£'000
Forecast
Outturn   
£'000
Current
Forecast
Variance
£'000
Previous
Forecast
Variance
£000
Change
£000 Explanation
Chief Executive's Unit 996 996 0 0 0
Executive Director (Douglas Hendry) 145,610 145,610 0 0 0
Executive Director (Kirsty Flanagan) 56,081 56,581 (500) 0 (500) This is due to the cost of new Bus Contracts for Public and Pupil Transport
across Argyll and Bute. 
Weather related incident ongoing
costs 0 3,567 (3,567) (3,567) This is the projected revenue overspend from the October 2023 weather event. A
separate report on the agenda provides Members with further detail on this.
Social Work 78,466 79,114 (648) 0 (648) The projected overspend is due to demand for residential placements within
Children and Families Services.
Central Budgets 20,812 21,083 (271) 0 (271) The projected overspend is due to pressure on the insurances budgets due to
inflation being higher than estimated.
Financed By (301,965) (302,293) 328 0 328 There is a projected over recovery of income for Council tax on 2nd homes.
Total 0 4,658 (4,658) 0 (4,658) 
Further information on the departmental forecast variances is included later on in the report.

Page 11

(4,000)
(3,500)
(3,000)
(2,500)
(2,000)
(1,500)
(1,000)
(500)
0
500
April
May
June
July
August
September
October
November
December
January
February
£ 000
Forecast outturn position for each Department from the start of the financial year
Chief Executive's Unit
Executive Director (Douglas Hendry)
Executive Director (Kirsty Flanagan)
Weather incident
Social Work
Central Budgets
Underspend
Overspend

Page 12

Year to Date Position
The year to date position as at 30 June 2024 is an overspend of £1.140m and the main variances are noted below. 
Department
YTD
Actual
£'000
YTD
Budget
£'000
YTD
Variance   
£'000
Explanation
Chief Executive's Unit 222 190 (32)
Executive Director (Douglas Hendry) 35,169 35,417 248
Executive Director (Kirsty Flanagan) 16,484 12,717 (3,767)
Social Work 2,861 2,780 (81)
Central Budgets (2,484) 8 2,492
Funding (80,182) (80,182) 0
Total Net Expenditure (27,930) (29,070) (1,140)
The year to date variance is largely due to profiling of budgets as opposed to
geniune under or overspends.  This will be rectified in the coming weeks.

Page 13

Further information on the departmental year to date variances is included later on in the report. 
-25%
0%
25%
50%
75%
100%
Chief Executive's Unit
Executive Director (Kirsty Flanagan)
Executive Director (Douglas Hendry)
Social W
ork
Central Budgets
TOTAL
Expenditure to date against the remaining budget for each Department
YTD Actual £000 Remaining Budget £000

Page 14

OBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 30 JUNE 2024 
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual Budget Forecast
Outturn
Forecast
Variance
Variance
£'000 £'000 £'000 % £'000 £'000 £'000 %
Departmental Budgets
Chief Executive's Unit 222 190 (32) (16.8%) 996 996 0 0.0%
Executive Director (Douglas Hendry) 35,169 35,417 248 0.7% 145,610 145,610 0 0.0%
Executive Director (Kirsty Flanagan) 16,484 12,717 (3,767) (29.6%) 56,081 56,581 (500) (0.9%)
Weather related incident ongoing costs 0 0 0 0.0% 0 3,567 (3,567) #DIV/0!
Social Work 2,861 2,780 (81) (2.9%) 78,466 79,114 (648) (0.8%)
Total Departmental Budgets 54,736 51,104 (3,632) (7.1%) 281,153 285,868 (4,715) (1.7%)
Central Budgets
Other Operating Income and Expenditure (3,602) 303 3,905 1288.8% 1,996 1,996 0 0.0%
Joint Boards 317 364 47 12.9% 1,458 1,458 0 0.0%
Non-Controllable Costs 801 (659) (1,460) 221.6% 17,358 17,629 (271) (1.6%)
Total Central Budgets (2,484) 8 2,492 31150.0% 20,812 21,083 (271) (1.3%)
TOTAL NET EXPENDITURE 52,252 51,112 (1,140) (2.2%) 301,965 306,951 (4,986) (1.7%)
Financed By
Aggregate External Finance (60,201) (60,201) 0 0.0% (248,490) (248,490) 0 0.0%
Local Tax Requirement (19,981) (19,981) 0 0.0% (63,278) (63,606) 328 (0.5%)
Contributions to General Fund 0 0 0 0.0% 9,803 9,803 0 0.0%
Earmarked Reserves 0 0 0 0.0% 0 0 0 0.0%
Total Funding (80,182) (80,182) 0 0.0% (301,965) (302,293) 328 (0.1%)
(Deficit)/Surplus for Period (27,930) (29,070) (1,140) 0 4,658 (4,658)
CURRENT PROJECTED FINAL OUTTURNYEAR TO DATE POSITION

Page 15

SUBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 30 JUNE 2024 
YEAR TO DATE POSITION CURRENT PROJECTED FINAL OUTTURN  
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual
Budget
Forecast
Outturn
Forecast
Variance
Variance  
£'000 £'000 £'000 % £'000 £'000 £'000 %
Subjective Category                
Employee Expenses 41,707 40,843 (864) (2.1%) 189,327 190,004 (677) (0.4%)
Premises Related Expenditure 2,631 3,263 632 19.4% 21,349 21,316 33 0.2%
Supplies and Services 7,068 6,602 (466) (7.1%) 23,887 24,074 (187) (0.8%)
Transport Related Expenditure 4,116 3,075 (1,041) (33.9%) 17,775 17,774 1 0.0%
Third Party Payments 36,910 37,746 836 2.2% 182,130 187,645 (5,515) (3.0%)
Capital Financing 213 (1,215) (1,428)   10,626 10,626 0 0.0%
TOTAL EXPENDITURE 92,645 90,314 (2,331) (2.6%) 445,094 451,439 (6,345) (1.4%)
Income (120,575) (119,384) 1,191 (1.0%) (445,094) (446,781) 1,687 (0.4%)
(Deficit)/Surplus for Period (27,930) (29,070) (1,140)   0 4,658 (4,658)   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.

Page 16

CHIEF EXECUTIVE’S UNIT – AS AT 30 JUNE 2024 
The department is currently forecasting spend in line with budget. 
The department has a year to date overspend of £0.032m (16.8%) which can be attributed to budget profiling issues. 
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Chief Executive 996 996 0 0 0
Totals 996 996 0 0 0
Year to Date Position 
Key Financial Successes:
• All savings options have been delivered.  
• The department’s 2023-24 outturn position was an underspend of £0.006m. This resulted from an overall underspend of £0.013m offset
by earmarking of £0.008m due to an auto-carry forward for unspent grants.   
Key Financial Challenges: Proposed Actions to address Financial Challenges:
To continue to deliver a high-quality service to support community
engagement and participation.
Regular monitoring, reflection and improvement cycle on service
provision to ensure most efficient use of staffing and financial
resources to meet national and local policy requirements for quality
engagement.
To continue to deliver a high quality support service function to community
organisations and community planning partners during a time of challenge
arising from continuing reductions in funding.
Within the partnership working of the CPP we seek to establish
working groups and collate resources within this to deliver high
quality solutions to identified needs.
0%
25%
50%
75%
100%
Chief Executive
Expenditure to date against the remaining budget for each
Service
YTD
Actual
£000
Remaining Budget
£000

Page 17

Demands for funding from community applications to the Supporting
Communities Fund higher than available annual funds by about 40%.
Continue to monitor fund criteria adapting this to align with priority
outcomes for Argyll & Bute and continue to support groups to seek
alternative sources of funding from our database of funding
providers.

Page 18

CHIEF EXECUTIVE’S UNIT – OBJECTIVE SUMMARY AS AT 30 JUNE 2024 
Service Area YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Executive 88 87 (1) (1.2%) 414 414 0 0.0% Outwith reporting criteria.
Community Planning
& Development 134 103 (31) (30.1%) 582 582 0 0.0%
Posts funded from earmarked
reserves/other funding - will be
corrected in July.  
222 190 (32) (16.8%) 996 996 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 19

CHIEF EXECUTIVE’S UNIT – SUBJECTIVE SUMMARY AS AT 30 JUNE 2024
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 210 173 (37) (21.4%) 838 838 0 0.0% Overspend caused by posts funded from
earmarkings/other budgets - will be rectified in July
Supplies and
Services 10 3 (7) (233.3%) 12 12 0 0.0% Profiling issues, will be rectified in July.
Transport 1 3 2 66.7% 14 14 0 0.0% Underspend on staff travel budgets.
Third Party 1 15 14 93.3% 149 149 0 0.0% Profiling issues, will be rectified in July.
Income 0 (4) (4) 100.0% (17) (17) 0 0.0% Profiling issues, will be rectified in July.
Totals 222 190 (32) (16.8%) 996 996 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 20

CHIEF EXECUTIVE’S UNIT – RED VARIANCES AS AT 30 JUNE 2024
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation      
0 0.0%   
A red variance is a forecast variance which is greater than +/- £50,000.

Page 21

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – AS AT 30 JUNE 2024  
The department is currently forecasting spend in line with budget. 
The department has a year to date (YTD) underspend of £0.248m (0.7%).  The year to date underspend is mainly due to the current budget
profile which will be refined through July.                           
Forecast Outturn Position 
Service Annual
Budget 
£000
Forecast
Outturn 
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change 
£000
Executive Director
(Douglas Hendry) 74 74 0 0 0
Head of
Commercial
Services
10,448 10,448 0 0 0
Head of Education 113,752 113,752 0 0 0
Head of Legal and
Regulatory
Support
21,336 21,336 0 0 0
Totals 145,610 145,610 0 0 0 
Year to Date Position 
0%
25%
50%
75%
100%
Executive Director
(Douglas Hendry)
Head of
Commercial
Services
Head of Education Head of Legal and
Regulatory Support
Expenditure to date against the remaining budget for each
Service
YTD
Actual
£000
Remaining Budget
£000

Page 22

Key Financial Successes:
The 2023-24 year-end consolidated outturn position was an under spend of £0.690m after adjusting for automatic earmarking. Contributing
factors included:
• Effective contract management of NPDO and Hub School contracts, including a lower-than-expected insurance premium due to the
annual renegotiation of insurance costs. 
• Successful negotiations with utility suppliers achieved further historic water charge refunds and ongoing reductions to water rates.
• Implementation of NDEEF project resulting in recurring annual saving in utilities and a significant contribution to meeting Net Zero
targets.
• Rationalisation of office space through Our Modern Workspace Programme has reduced utility costs, printer costs and cleaning costs
as well as receiving Non-Domestic Rates relief for closed buildings. 
• Income generation within Early Years, including expansion at Rothesay Joint Campus to accommodate care for children under the age
of 2 
Key Financial Challenges: Proposed Actions to address Financial Challenges:
The legacy impact of COVID-19 on our young learners has led to an
increased demand on the additional support need functions of the
Education Service in response to the growing health and wellbeing
needs of our young people and their families. This increase is consistent
across Scotland.
Analysis and review of delivery models has taken place, robust
costings of any agreed changes to delivery model and continual
monitoring of associated budgets.  Maximise use of Additional
Support for Learning Funding and Mental Health and Wellbeing
Funding whilst working collaboratively across Children’s Services.
Impact of the current cost of living crisis on the cost of the school day for
learners and their families.
Work with schools to ensure effective use of Strategic Equity
Funding and Pupil Equity Funding to close the poverty related
attainment gap and identify other funding sources to ensure equity
of experience for all children.
Impact of the current cost of living crisis on uptake in demand led service
areas like catering, design services and licensing.
Continually refine/develop systems to accurately forecast service
usage, budget outturn and future budget requirements.  Strategies
in place to redesign services in line with demand. 
Rising cost of material and labour costs within the Central Repairs
Budget across the department may result in a reduction in activity or
overspends.
Costs are monitored regularly and contained as much as possible
with any unavoidable overspends highlighted as soon as known. 
Ensure that the School Catering Service remains efficient and effective
as the impact of high inflation on produce and a requirement to adhere to
the Statutory Guidance supporting Nutritional Requirements for Food and
Drink in Schools (Scotland) Regulations 2020, has increased the cost of
producing a school meal.
Through good procurement of supplies and the introduction of a
school meal pre order app that will reduce food waste. Produce
meals that pupils want to eat through regular consultation and a
range of menu choices.

Page 23

The Council has a requirement to deliver 1140 hours of Early Learning
and Childcare (ELC) to eligible 2-year-olds and all 3–5-year-old children.
Following two years of reduced funding the service must continually
redesign to fit the resources available. 
Robust service costings, financial monitoring and timely reporting
to ensure the service can be delivered within the available budget.
Medium term forecasting on population to shape ongoing service
redesign. Analysis of potential to extend income generation using
“spare” capacity to trial paid care for under 2’s
Impact of high inflationary uplifts within the NPDO/HUB School contracts.  Ensuring continued effective contract management of NPDO/HUB
Schools to minimise the impact of high inflationary uplifts. 
The Scottish Government has Ringfenced some Education funding which
is dependent on Maintaining Teacher Numbers (MTN) to a set level. The
target has increased for 2024-25 with no increase in funding.
Monitor teacher numbers and associated costs, highlighting any
budget pressures immediately.  If teacher numbers fall due to
delays in recruitment, report the potential financial penalty to
departmental management.

Page 24

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – OBJECTIVE SUMMARY AS AT 30 JUNE 2024 
Service Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director
(Douglas
Hendry)
Central/Management
Costs
80 86 6 7.0% 74 74 0 0.0% Outwith Reporting Criteria    
80 86 6 7.0% 74 74 0 0.0%  
Head of
Commercial
Services
Catering 75 (142) (217) 152.8% 321 321 0 0.0% The YTD overspend is largely due to
timing of school meal recharges for
which budgets will be reprofiled. 
Head of
Commercial
Services
Central/Management
Costs
287 288 1 0.4% 1,721 1,721 0 0.0% Outwith Reporting Criteria
Head of
Commercial
Services
CHORD 30 14 (16) (114.3%) 24 24 0 0.0% The YTD overspend is largely due to
timing of recharges to capital
projects. 
Head of
Commercial
Services
Cleaning (58) 9 67 744.4% 400 400 0 0.0% The YTD underspend is largely due
to timing of recharges to Education
and reduced use of bank staff. 
Head of
Commercial
Services
Culture, Heritage,
Recreation & Sport
1,313 1,354 41 3.0% 5,669 5,669 0 0.0% Outwith Reporting Criteria
Head of
Commercial
Services
Events &
Commercial
Catering
36 (15) (51) 340.0% 7 7 0 0.0% The YTD overspend is due to under-
recovery of income budgets within
Events and Commercial Cafes. 
Head of
Commercial
Services
Property Portfolio (110) (53) 57 (107.6%) (189) (189) 0 0.0% The YTD underspend is due to
profiling of budgets relating to rental
income from industrial sites and
investment properties. 
Head of
Commercial
Services
Property Services 303 337 34 10.1% 861 861 0 0.0% The YTD underspend is due to
vacancies within Property Services.

Page 25

Head of
Commercial
Services
Shared Offices 219 317 98 30.9% 1,634 1,634 0 0.0% The YTD underspend is due to
profiling of CRA and rental income
budgets. 
2,095 2,109 14 0.7% 10,448 10,448 0 0.0%  
Head of
Education
Additional Support
for Learning
2,737 2,641 (96) (3.6%) 11,788 11,788 0 0.0% The YTD overspend is largely within
ASN Assistants and this will be
remedied through a drawdown from
Earmarked Reserves in July.
Head of
Education
Central/Management
Costs
747 296 (451) (152.4%) 1,899 1,899 0 0.0% The YTD overspend is largely due to
profiling of central teaching staff
budgets which have been profiled
into March in error. This will be
corrected in July. 
Head of
Education
Community Learning
& Development
2 1 (1) (100.0%) 15 15 0 0.0% The YTD overspend is due to utilities
costs within CLD premises for which
budgets will be rightsized throughout
the year. 
Head of
Education
COVID 15 0 (15) n/a 0 0 0 0.0% The YTD overspend will be rectified
through drawdown of earmarkings. 
Head of
Education
Early Learning &
Childcare
3,250 3,715 465 12.5% 17,495 17,495 0 0.0% The YTD underspend is largely due
to accruals still to be recharged
relating to ELC upgrade works at
Rothesay Joint Campus and budget
profiling within ELC Settings and
Central ELC budgets. This is
partially offset by a YTD overspend
in 1140 which will be remedied
through a drawdown from
Earmarked Reserves in July.
Head of
Education
Primary Education 9,602 9,664 62 0.6% 40,496 40,496 0 0.0% The YTD underspend relates to
profiling of budgets within schools
for NPDO Facilities Management
recharges which have not yet been
recharged for the current year,
partially offset by profiling of Pupil
Equity Fund grant and school meal
income budgets.

Page 26

Head of
Education
Pupil Support 525 458 (67) (14.6%) 2,419 2,419 0 0.0% The YTD overspend is due to higher
than budgeted demand for Schools
Residential Placements. This will be
monitored closely throughout the
year. There is also an overspend in
the Wellbeing budget and this will be
remedied through a drawdown from
Earmarked Reserves in July.
Head of
Education
Schools - Central
Services
579 603 24 4.0% 2,376 2,376 0 0.0% Outwith Reporting Criteria
Head of
Education
Secondary
Education
8,847 9,163 316 3.5% 37,264 37,264 0 0.0% The YTD underspend relates to
profiling of budgets within schools
for NPDO Facilities Management
recharges which have not yet been
recharged for the current year,
partially offset by profiling of Pupil
Equity Fund grant and school meal
income budgets.      
26,304 26,541 237 0.9% 113,752 113,752 0 0.0%  
Head of Legal &
Regulatory
Support
Central/Management
Costs
56 52 (4) (7.7%) 264 264 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Community Safety 106 37 (69) (186.5%) 168 168 0 0.0% The YTD overspend will be partially
rectified through drawdown of
earmarkings and processing of
prepayments at year end. 
Head of Legal &
Regulatory
Support
Elections 32 31 (1) (3.2%) 37 37 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Governance 83 63 (20) (31.8%) 731 731 0 0.0% The YTD overspend will be partially
rectified through drawdown of
earmarkings and processing of
prepayments at year end. 
Head of Legal &
Regulatory
Support
Governance, Risk &
Safety
125 116 (9) (7.8%) 554 554 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Legal Services 35 81 46 56.8% 701 701 0 0.0% The YTD underspend is due to
timing of licensing income.

Page 27

Head of Legal &
Regulatory
Support
NPDO and Hub
Schools
5,873 5,946 73 1.2% 17,111 17,111 0 0.0% The YTD underspend is due to the
profiling of budget for third party
payments. 
Head of Legal &
Regulatory
Support
Procurement,
Commercial and
Contract
Management
227 227 0 0.0% 1,160 1,160 0 0.0% Outwith Reporting Criteria
Head of Legal &
Regulatory
Support
Trading Standards &
Advice Services
153 128 (25) (19.5%) 610 610 0 0.0% The YTD overspend will be partially
rectified through drawdown of
earmarkings and re-profiling of grant
income budgets. 
6,690 6,681 (9) (0.1%) 21,336 21,336 0 0.0%      
35,169 35,417 248 0.7% 145,610 145,610 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 28

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – SUBJECTIVE SUMMARY AS AT 30 JUNE 2024  
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 24,439 24,038 (401) (1.7%) 106,732 106,732 0 0.0% The YTD overspend is largely due to profiling of central
teaching staff budgets which have been profiled in to
March in error. Budget adjustments relating to new
year grant awards also require to be input to offset
variances. 
Premises 1,434 1,877 443 23.6% 8,480 8,480 0 0.0% The YTD underspend is largely due to accruals still to
be recharged relating to ELC upgrade works at
Rothesay Joint Campus as well as profiling of CRA
budgets across all Services. 
Supplies and
Services
3,058 3,183 125 3.9% 13,690 13,690 0 0.0% The YTD underspend relates to profiling of Pupil Equity
Fund budgets and timing of recharges for school meals
for the June period. 
Transport 100 84 (16) (19.1%) 333 333 0 0.0% The YTD overspend is due to small overspends within
staff travel budgets across all Services, which are likely
to be offset by underspends elsewhere. 
Third Party 9,069 9,815 746 7.6% 46,521 46,521 0 0.0% The YTD underspend relates to profiling of budgets
within schools for NPDO Facilities Management
recharges which have not yet been recharged for the
current year. 
Income (2,931) (3,580) (649) 18.1% (30,146) (30,146) 0 0.0% The YTD overspend relates to the profiling of Pupil
Equity Fund grant and school meal income budgets.  
Totals 35,169 35,417 248 0.7% 145,610 145,610 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 29

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – RED VARIANCES AS AT 30 JUNE 2024
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation                        
A red variance is a forecast variance which is greater than +/- £50,000.

Page 30

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – AS AT 30 JUNE 2024 
The department has a forecast overspend of £0.500m (0.9%). This is due to the cost of new Bus Contracts for Public and Pupil Transport
across Argyll and Bute.  Since the end of June a further pressure of £0.210m in relation to bus contracts has been identified as more contracts
are renewed therefore in the next reporting period the forecast overspend relating to bus contracts will increase from £0.500m to £0.710m. 
There is also further potential overspends relating to repairs to the Belnahua Ferry (£0.250m) and TRO Income (£0.100m) which was a
previously agreed saving to secure additional income that has been unachievable that have been highlighted since the end of June.  This will
take the departmental overspend to £1.060m. 
A separate report in relation to the October 2023 Weather Event is on the agenda and provides members with an update on the various flood
sites, estimated overspends and proposed range of measures for Members to consider which could be used to cover the estimated
overspends.  The projected revenue overspend of £3.567m is presented within the Corporate Overview. 
The department has a year to date overspend of £3.767m (29.6%).  This is mainly due to an outstanding accrual from Scottish Government for
the Bellwin Claim as well as the profile of a number of budgets across the department.  
Forecast Outturn Position 
Service Annual
Budget 
£000
Forecast
Outturn 
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change 
£000
Executive Director
(Kirsty Flanagan) (271) (271) 0 0 0
Head of Customer
Support Services
8,793 8,793 0 0 0
Head of
Development and
Economic Growth 7,785 7,785 0 0 0
Head of Financial
Services 6,756 6,756 0 0 0
Head of Roads
and Infrastructure
Services 33,018 33,518 (500) 0 (500)
Totals 56,081 56,581 (500) 0 (500) 
Year to Date Position 
0%
25%
50%
75%
100%
Executive
Director
(Kirsty
Flanagan)
Head of
Customer
Support
Services
Head of
Development
and
Economic
Growth
Head of
Financial
Services
Head of
Roads and
Infrastructure
Services
Expenditure to date against the remaining budget for
each Service
YTD
Actual
£000
Remaining Budget
£000

Page 31

Key Financial Successes:
The department had a challenging 2023-24 financial year with few financial successes largely due to the Weather Incident in October creating
substantial pressures as well as reduced income due to numerous ferry cancellations at our Piers & Harbours. 
Key Financial Challenges: Proposed Actions to address Financial Challenges:
Ensuring that services spend to budget and do not overspend after the
department had an overspend of £1.3m after automatic earmarkings in
2023-24.
Detailed monitoring in the key areas overspent in 2023-24 to flag up
concerns early and mitigate before becoming an overspend. 
Department / Service ongoing ability to meet future savings / efficiency
requirements.
Monitoring of trends / expenditure levels / service configuration and
the Service Packages Policy Options savings process.
Rising cost of materials, software and consultancy services across the
service will result in a reduction in activity or overspends.
Costs are monitored regularly and contained as much as possible
with any unavoidable overspends highlighted as soon as known.
Financial Services to continue to deliver a high-quality support service
function during a time of substantial uncertainty and challenge arising from
continuing reductions in funding whilst costs are increasing due to ongoing
high levels of inflation and service demand caused by world events.
Ensure the team is operating as efficiently and effectively as
possible by building resilience across the team and working
collaboratively with other services of the Council to support
evidence-based decision making. 
Winter Maintenance costs are difficult to estimate as they are very much
dependant on the weather.  
Close monitoring of Winter Maintenance activity and reporting of the
financial implications through the budget monitoring process. The
Council agreed the winter policy, setting out the intervention level
and locations to be treated.  The number of treatments is determined
by weather conditions. The current budget provision provides for 56
full equivalent runs. There is a sophisticated weather monitoring
system in place consisting of several weather stations, this is
supported by a forecasting and meteorological service which is
collaboratively procured by West of Scotland local authorities.
Climate Change Mitigation impacting on the departments key
infrastructure due to increased inspection regimes will result in
overspends.
The Council will continue to tackle climate change, looking at
financially sustainable options and will closely monitor the financial
consequences.
Dangerous buildings costs as there is no budget for this expenditure and
the council has no control over the demand for the service.
Building Standards, Legal Services and Financial Services are
working closely to manage debt recovery and to consider other
options to minimise corporate risk exposure.

Page 32

Ferry Grant from Transport Scotland has stayed the same for 2024-25
despite increased costs for employee inflation as well as other general
inflationary increases.
Costs are monitored regularly and contained as much as possible
with any unavoidable overspends highlighted as soon as known.
Due to the nature of the various components of Waste Management there
are ongoing challenges with:
• The introduction of the Deposit Return Scheme
• Uncertainty with recycling income/ gate fee costs due to the           
volatility of the market
• Challenges in the legislative changes around the disposal of      
Biodegradable Municipal Waste
• The Circular Economy Bill that has recently been passed  and the
implications that may bring 
To closely monitor all service components of Waste Management
and review the Waste Strategy in conjunction with our contractual
partner Renewi (previously Shanks).

Page 33

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 30 JUNE 2024
Service
Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director (Kirsty
Flanagan)
Central/Management
Costs
63 63 0 0.0% (271) (271) 0 0.0% Outwith Reporting Criteria    
63 63 0 0.0% (271) (271) 0 0.0%  
Head of
Customer
Support Services
Central/Management
Costs
29 30 1 3.3% 167 167 0 0.0% Outwith Reporting Criteria
Head of
Customer
Support Services
Communications 67 64 (3) (4.7%) 312 312 0 0.0% Outwith Reporting Criteria
Head of
Customer
Support Services
Customer Service
Centres
272 298 26 8.7% 1,616 1,616 0 0.0% Outwith Reporting Criteria
Head of
Customer
Support Services
HR 624 587 (37) (6.3%) 2,370 2,370 0 0.0% Outwith Reporting Criteria
Head of
Customer
Support Services
ICT 1,294 1,260 (34) (2.7%) 4,345 4,345 0 0.0% Outwith Reporting Criteria
Head of
Customer
Support Services
Registrars (32) (20) 12 (60.0%) (17) (17) 0 0.0% YTD variance due to over-
recovery of income received for
marriages due to increased
activity over summer months    
2,254 2,219 (35) (1.6%) 8,793 8,793 0 0.0%  
Head of
Development &
Economic Growth
Airports 343 268 (75) (28.0%) 1,186 1,186 0 0.0% YTD variance due to profile of
budget for Private Contactors
which will be rectified over the
coming months
Head of
Development &
Economic Growth
Building Control (110) (80) 30 (37.5%) (113) (113) 0 0.0% YTD variance due to over-
recovery of Building Warrant
income received
Head of
Development &
Economic Growth
Central/Management
Costs
122 129 7 5.4% 572 572 0 0.0% Outwith Reporting Criteria

Page 34

Head of
Development &
Economic Growth
Culture & Heritage 34 51 17 33.3% 225 225 0 0.0% YTD variance due to profile of
Rothesay Pavilion which will be
rectified over the coming months
Head of
Development &
Economic Growth
Development
Management
126 (52) (178) 342.3% 114 114 0 0.0% YTD variance due to under-
recovery of Planning Fee
income received
Head of
Development &
Economic Growth
Development Policy 79 98 19 19.4% 475 475 0 0.0% YTD variance due to profile of
budget for third party payments
which will be rectified over the
coming months
Head of
Development &
Economic Growth
Economic
Development
318 299 (19) (6.4%) 1,032 1,032 0 0.0% Outwith Reporting Criteria
Head of
Development &
Economic Growth
Environmental
Health
204 250 46 18.4% 1,268 1,268 0 0.0% YTD variance is due to timing of
Private Landlord Registration
income which will be rectified
over the coming months.
Head of
Development &
Economic Growth
Environmental
Initiatives
13 13 0 0.0% 104 104 0 0.0% Outwith Reporting Criteria
Head of
Development &
Economic Growth
Housing 1,577 948 (629) (66.4%) 2,695 2,695 0 0.0% YTD variance due to timing of
grant claim for HEEPS with
expenditure incurred in advance
of income being received
Head of
Development &
Economic Growth
Private Landlords (351) (9) 342 (3800.0%) 0 0 0 0.0% YTD variance is due to timing of
Short Term Let income which
will be rectified over the coming
months.
Head of
Development &
Economic Growth
Transportation
Policy
449 50 (399) (798.0%) 227 227 0 0.0% YTD variance due to timing of
grant claim for CWSS with
expenditure incurred in advance
of income being received    
2,804 1,965 (839) (42.7%) 7,785 7,785 0 0.0%  
Head of Financial
Services
Accounting &
Budgeting
508 566 58 10.3% 2,559 2,559 0 0.0% YTD underspend due to the
timing of cash flows in
comparison to the profiling of
budget and will be rectified over
the financial year. 
Head of Financial
Services
Internal Audit &
Fraud
64 73 9 12.3% 332 332 0 0.0% YTD underspend caused by
slippage on a vacant post.

Page 35

Head of Financial
Services
Revenues & Benefits 738 855 117 13.7% 3,063 3,063 0 0.0% YTD underspend due to the
timing of cash flows in
comparison to the profiling of
budget and will be rectified over
the financial year. 
Head of Financial
Services
Scottish Welfare
Fund
232 159 (73) (45.9%) 802 802 0 0.0% Earmarkings requiring to be
drawn down against overspends
- this will be rectified in next
reporting period.    
1,542 1,653 111 6.7% 6,756 6,756 0 0.0%  
Head of Roads &
Infrastructure
Services
Amenity 990 802 (188) (23.4%) 3,146 3,146 0 0.0% YTD variance mainly due to
delay in Interment Fees in
Cemeteries and budget profile of
internal recharges within Public
Conveniences
Head of Roads &
Infrastructure
Services
Car Parking (70) (168) (98) 58.3% (590) (590) 0 0.0% YTD variance due to delay in
receiving income for Electric
Vehicle usage
Head of Roads &
Infrastructure
Services
Central/Management
Costs
699 636 (63) (9.9%) 2,764 2,764 0 0.0% YTD  variance due to profile of
internal recharge budget which
will be rectified for future
monitoring
Head of Roads &
Infrastructure
Services
Depots 92 (103) (195) 189.3% (313) (313) 0 0.0% YTD  variance due to profile of
internal recharge budget which
will be rectified for future
monitoring
Head of Roads &
Infrastructure
Services
Fleet & Transport 2,603 2,167 (436) (20.1%) 8,724 9,224 (500) (5.7%) YTD variance due to internal
fleet maintenance costs and
increased bus contracts for
Public Transport and Pupil
Transport.
Forecast overspend reported
due to increased contract costs
for Public Transport.  This will
increase to £710k in next
reporting period as further
contracts are in the process of
being renewed with increased
costs.

Page 36

Head of Roads &
Infrastructure
Services
Infrastructure (7) 138 145 105.1% 725 725 0 0.0% YTD variance due to outstanding
accruals within Coastal
Protection
Head of Roads &
Infrastructure
Services
Marine 32 (629) (661) 105.1% (3,866) (3,866) 0 0.0% YTD variance due to timing of
Piers & Harbours income
alongside additional costs due to
Ferry maintenance
Head of Roads &
Infrastructure
Services
Network & Traffic
Management
42 5 (37) (740.0%) 154 154 0 0.0% YTD variance due to shortfall in
income for Traffic Regulation
Orders
Head of Roads &
Infrastructure
Services
Road Safety 24 26 2 7.7% 131 131 0 0.0% Outwith Reporting Criteria
Head of Roads &
Infrastructure
Services
Roads & Lighting 4,174 1,587 (2,587) (163.0%) 7,481 7,481 0 0.0% YTD variance due to outstanding
accruals from Scottish
Government for Bellwin Claim
alongside profile of internal
recharge budget within the
Roads and Lighting Holding
account.
Head of Roads &
Infrastructure
Services
Waste 1,242 2,356 1,114 47.3% 14,662 14,662 0 0.0% YTD variance mainly due to the
profile of the Waste PPP
contract payments which will be
rectified over coming months    
9,821 6,817 (3,004) (44.1%) 33,018 33,518 (500) (1.5%)      
16,484 12,717 (3,767) (29.6%) 56,081 56,581 (500) (0.9%)   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 37

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – SUBJECTIVE SUMMARY AS AT 30 JUNE 2024
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 8,654 8,772 118 1.4% 42,988 42,988 0 0.0% YTD variance mainly due to vacancies within the Roads and
Lighting Holding Account which are being covered by
external contractors
Premises 719 864 145 16.8% 3,624 3,624 0 0.0% YTD variance mainly due to the profile of the Depot internal
recharges which will be profiled to rectify for next monitoring
period.
Supplies
and
Services
3,373 2,620 (753) (28.7%) 9,139 9,139 0 0.0% YTD variance mainly due to purchase of materials within
Roads which will be offset against additional income over the
coming months, alongside payments made against UK
Shared Prosperity Fund which will be offset with grant
income once received
Transport 3,862 2,835 (1,027) (36.2%) 16,401 16,401 0 0.0% YTD variance due to internal fleet and ferry maintenance
costs.
Third Party 16,093 15,584 (509) (3.3%) 64,771 65,271 (500) (0.8%) YTD variance mainly due to grant payments within Economic
Development and Transportation that either have or will be
offset with grant income once received as well as an
overspend on public transport and the profile of budgets
across a number of cost centres.
Capital
Financing
0 0 0 0.0% 2,677 2,677 0 0.0% Outwith Reporting Criteria
Income (16,217) (17,958) (1,741) 9.7% (83,519) (83,519) 0 0.0% YTD variance mainly due to profile of income recharges
within the Roads Operational Holding Account which is
partially offset with grant income received within Economic
Development to cover expenditure incurred within Third party
Payments
Totals 16,484 12,717 (3,767) (29.6%) 56,081 56,581 (500) (0.9%)   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 38

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – RED VARIANCES AS AT 30 JUNE 2024 
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Public Transport 5,266 5,766 (500) (9.5%)
New bus contracts in place for Public and Pupil Transport.  This will
increase to £710k in next reporting period as further contracts are in the
process of being renewed with increased costs. 
A red variance is a forecast variance which is greater than +/- £50,000.

Page 39

SOCIAL WORK – AS AT 30 JUNE 2024 
The department is currently forecasting an overspend of £0.648m (0.8%). This is due to demand for residential placements within Children and
Families Services.   
The department has a year-to-date overspend of £0.081m (0.2%) which again is due to demand driven services within Children and Families.   
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
£000
Previous
Forecast
Variance
£000
Change
£000
Chief Officer Integration (3,470) (3,490) 20 0 20
Head of Strategic Planning
and Performance 480 478 2 0 2
Head of Health and
Community Care 43,455 43,558 (103) 0 (103)
Head of Acute and
Complex Care 21,427 21,074 353 0 353
Head of Children and
Families 16,574 17,494 (920) 0 (920)
Totals 78,466 79,114 (648) 0 (648)
Year to Date Position 
Key Financial Successes: 
Delivered a balanced budget at the end of 2023/24 after utilising £1.826m of reserves. An additional amount of £0.209m was transferred to IJB
reserves and should allow for future investment and transformation across Social Work. 
-115%
-90%
-65%
-40%
-15%
10%
35%
60%
85%
110%
Chief Officer
Integration
Head of Adult
Services
Head of Children
and Families
Head of Strategic
Planning and
Performance
Expenditure to date against the remaining budget for each
Service
YTD
Actual
£000
Remaining Budget
£000

Page 40

Key Financial Challenges: Proposed Actions to address Financial Challenges:
Deliver the outstanding savings total for 2024/25 of £1.132m (as at June
2024).
Maintain a close working relationship with the HSCP Service
Improvement Team to quickly and efficiently identify and assess
options for delivering the outstanding savings. 
Development and delivery of future service redesigns which will be
necessary to contain service expenditure within the allocated resource,
noting that in year savings still need to be identified for 24/25 to address
the 24/25 budget gap, as well as budget gaps in future years. 
Support from finance to assist strategic managers to develop and
identify further savings and to look beyond the short term to identify
and plan the changes which will be needed to address the expected
ongoing budget challenges over the current, and future, years.
Use of agency staff to support service delivery across Social Work, but
particularly in Older People services, due to recruitment and retention
challenges within the service. Year to date spend at June 2024 of
£0.996m. 
Close working relationship with the HSCP to support the costing of
a plan to stabilise the service and ensure it is operationally and
financially sustainable. This includes an exit plan from the reliance
on agency staff. 
Cost of living crisis affecting pay inflation negotiations and financial
sustainability of service providers, which could affect affordability and
sustainability of service delivery. 
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be evaluated and reported through the
budget monitoring and preparation processes.

Page 41

SOCIAL WORK – OBJECTIVE SUMMARY AS AT 30 JUNE 2024
Service Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Officer
Integration
Integration
Headquarters
152 117 (35) (29.9%) 596 593 3 0.5% The YTD variance is due to front loaded
payments relating to the purchase of
computer software. The forecast variance is
outwith reporting criteria.
Chief Officer
Integration
Social Work
Central
Support
(548) (545) 3 (0.6%) (4,066) (4,083) 17 (0.4%) The YTD variance is outwith the reporting
criteria however the annual budget and
forecast outturn are currently showing as
negative due to budget drawdowns waiting to
be actioned.  These will be processed during
July.    
(396) (428) (32) (30.5%) (3,470) (3,490) 20 0.1%  
Head of
Strategic
Planning &
Performance
Management
& Central
Costs
86 87 1 1.2% 448 448 0 0.0% The YTD and forecast variances are outwith
the reporting criteria.
Head of
Strategic
Planning &
Performance
Service
Development
9 5 (4) (80.0%) 32 30 2 6.3% The YTD variance is due to timing differences
on charges to health boards. The forecast
variance is outwith the reporting criteria.    
95 92 (3) (78.9%) 480 478 2 6.3%  
Head of
Health and
Community
Care
Management
& Central
Costs
72 45 (27) (60.0%) 582 594 (12) (2.1%) The YTD variance is due to timing differences
on the charges to health boards.  The
forecast variance is outwith reporting criteria.
Head of
Health and
Community
Care
Older People 1,680 1,783 103 5.8% 42,873 42,964 (91) (0.2%) The YTD and forecast variance are both due
to known commitments on Carefirst.    
1,752 1,828 76 4.2% 43,455 43,558 (103) (0.2%)  
Head of
Acute and
Complex
Care
Learning
Disabilities
(2,078) (1,981) 97 (4.9%) 15,128 14,816 312 2.1% The YTD variance is due to timing differences
on charges to health boards and other income
lines. The forecast underspend is based on
current known commitments on Carefirst.
Head of
Acute and
Complex
Care
Management
& Central
Costs
16 29 13 44.8% 128 115 13 10.2% The YTD and forecast underspend are based
on current projected training costs and
supplies and services costs which could
improve as spend trend becomes clearer.

Page 42

Head of
Acute and
Complex
Care
Mental Health (210) (264) (54) 20.5% 3,063 3,395 (332) (10.8%) The YTD variance is due to known
commitments. The forecast overspend is
based on current known commitments on
Carefirst.
Head of
Acute and
Complex
Care
Physical
Disability
212 268 56 20.9% 3,108 2,748 360 11.6% The YTD variance is due to known
commitments. The forecast underspend is
based on current known commitments on
Carefirst.    
(2,060) (1,948) 112 81.3% 21,427 21,074 353 13.0%  
Head of
Children &
Families
Child
Protection
620 692 72 10.4% 3,619 3,522 97 2.7% The YTD variance is based on known
commitments and some deferred income
received from previous years. The forecast
underspend is as a result of demand for
contact and welfare services and deferred
income in the area teams budget lines.
Head of
Children &
Families
Children with
a Disability
274 245 (29) (11.8%) 1,065 1,077 (12) (1.1%) The YTD variance is based on known
commitments. The forecast variance is
outwith reporting criteria.
Head of
Children &
Families
Criminal
Justice
117 3 (114) (3800.0%) 174 165 9 5.2% The YTD variance is due to timing of grant
income. The forecast variance is outwith
reporting criteria.
Head of
Children &
Families
Looked After
Children
1,844 1,628 (216) (13.3%) 7,938 8,938 (1,000) (12.6%) The YTD variance is due to an increase in the
demand in the number of residential
placements. The forecast overspend relates
to childrens external residential placements. 
We currently have 16 children in placements
with a potential 6 other children being
considered.  This overspend is unlikely to
improve as we progress through the financial
year.
Head of
Children &
Families
Management
& Central
Costs
615 668 53 7.9% 3,778 3,792 (14) (0.4%) The YTD variance is due to increased s12
payments. The forecast variance is outwith
reporting criteria.    
3,470 3,236 (234) (7.2%) 16,574 17,494 (920) (5.6%)  
GRAND
TOTAL   2,861 2,780 (81) (2.9%) 78,466 79,114 (648) (0.8%)

Page 43

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 44

SOCIAL WORK – SUBJECTIVE SUMMARY AS AT 30 JUNE 2024 
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 7,613 7,177 (436) (6.1%) 34,715 35,120 (405) (1.2%) Both the YTD and forecast overspend is due
to the use of agency staff across the HSCP
partially offset by payroll underspends due to
vacancies. 
Premises 471 522 51 9.8% 1,701 1,668 33 1.9% The YTD underspend is largely due to
budget profiling and the forecast underspend
is outwith the reporting criteria.
Supplies &
Services
470 421 (49) (11.6%) (661) (473) (188) 28.4% The YTD overspend is largely due to the
timing of payments relating to the purchase
of computer software and the forecast
budget and outturn variances are due to the
profiling of savings options not yet achieved.
Transport 143 144 1 0.7% 619 618 1 0.2% The YTD variance is outwith reporting
criteria.
Third Party 11,321 11,306 (15) (0.1%) 66,469 67,917 (1,448) (2.2%) The YTD variance is outwith reporting
criteria. The forecast overspend is due to
demand for purchased care services across
both Childrens and Adult Services.
Income (17,157) (16,790) 367 (2.2%) (24,377) (25,736) 1,359 (5.6%) The YTD and forecast over recovery of
income is mainly due to increased income
from fees, charges and recharges.
Totals 2,861 2,780 (81) (2.9%) 78,466 79,114 (648) (0.8%)

Page 45

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year.  
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 46

SOCIAL WORK – RED VARIANCES AS AT 30 JUNE 2024
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Looked After
Children 7,950 8,950 (1,000) (12.6%)
The forecast overspend relates to childrens external residential placements.  We currently have 16
children in placements with a potential 6 other children being considered.  This overspend is unlikely
to improve as we progress through the financial year.
Child Protection 3,620 3,523 97 2.7% The forecast underspend is as a result of demand for contact and welfare services and deferred
income in the area teams budget lines.
Older People -
Homecare 19,989 19,487 502 2.5% The forecast underspend is based on current known commitment from CareFirst system. 
Older People -
Internal
Residential
7,622 6,970 652 8.6% The forecast underspend is due to over-recovery of income. 
Older People -
External
Residential
12,385 13,483 (1,098) (8.9%) The forecast overspend reflects demand for service based on known package commitments.
Older People -
Other 9,690 9,837 (147) (1.5%) The forecast underspend is due to an over recovery of income. 
Physical Disability 3,862 3,502 360 9.3% The forecast underspend is based on current known commitments on Carefirst.
Learning Disability 20,424 20,112 312 1.5% The forecast underspend is based on current known commitments on Carefirst.
Mental Health 3,954 4,301 (347) (8.8%) The forecast overspend is based on current known commitments on Carefirst. 
A red variance is a forecast variance which is greater than +/- £50,000.

Page 47

MONITORING OF SAVINGS – AS AT 30 JUNE 2024
New policy savings were identified for the three year period 2024-25 to 2026-27 and these were agreed by Council in February 2024.  Council
agreed to policy savings of £0.665m on a recurring basis. 
The position of historical policy saving options is as follows:
- 2023/24 – those not delivered or that have further increases in value in 2024-25 onwards total £5.387m
- 2022/23 – those not delivered or that have further increases in value in 2024-25 onwards total £0.170m
- 2021/22 – those not delivered total £0.041m
- 2020/21 – all delivered
- 2019/20 – all delivered
- 2018/19 - those not delivered total £0.204m
The 2024-25 savings have been removed from departmental budgets, however, it is important to monitor whether the saving has actually been
delivered to ensure that costs are not continuing resulting in an overspend by the end of the year.  It is also important to ensure that any
preparatory work required to deliver savings in future years is on track. 
There is one saving where the department has indicated it will not be achieved in full and one saving categorised as having a potential shortfall,
as summarised below:
Saving Saving
Agreed
Status Detail Shortfall/
Delayed
Value
TB13b Roads and
Amenity Services
charging (non-statutory
services)
Feb-18 Will not be achieved in
full.
The original proposal was to introduce charges for providing lighting
design and increase charges by 20% for road construction consents,
skips, scaffolds, hoarding, permits and licences. Whilst some
additional income has been generated through third party works,
opportunities are expected to be limited over the foreseeable future
due to staff shortages and other competing demands.   
A cost pressure will be added to the 2025-26 budget for this shortfall
and the service will look at other potential savings as part of the RIS
Review.
£100,000

Page 48

TB12b Stadiums Feb-18 Potential Shortfall -
there is a risk that the
original saving will not
be achieved in full.  
Discussions had stalled with partners in the Oban and Lorn area with
regard to Mossfield stadium to create a sports Hub, attract external
funding to improve facilities and therefore attract additional events to
the arena.  The users group has now reconvened and will be
reporting to the steering group. It should be noted there is generally a
downturn in usage of pitches partly due to more clubs booking all
weather pitches at high schools and the loss of a well-established
club disbanding which will result in the loss of income. The Mossfield
Sport Group have highlighted that certain clubs along with the Shinty
Associations have expressed concerns with regards to the condition
of the Pavilion and changing facilities and this is likely to impact on
income.  East King Street bookings have reduced due to the
condition of the changing facilities and clubs having to play their
fixtures elsewhere.
£30,000 
All policy saving options previously agreed are noted in the table below for information.

Page 49

2024-25 2024-25
£000 FTE
Executive Director Douglas Hendry
CS01 Feb-22 Commercial
Services
Property Services Climate Change & Resource Efficiency 63.0 0.00 On Track to be Delivered
202425 008 Feb-24 Commercial
Services - Live
Argyll
Live Argyll 10%
reduction
10% reduction to the Management Fee
paid to Live Argyll Leisure Trust from the
Council.
363.00 0.0 Delivered
202425 011 Feb-24 Education Positive Starts Referrals to the Positive Starts support
scheme have been reducing year on year,
furthermore the Early Years team no
longer have capacity to quality assure and
administer this budget to a level where
they can ensure a positive impact for
children and families or best value in
relation to the service. Referrals come
form Health and Social Work, not
Education however the HSCP were not
willing to manage this budget.
40.0 0.00 Delivered
202425 009 Feb-24 Governance,
Risk and
Safety
Governance
Restructure
Reorganisation of Governance team and
remove posts that are currently vacant.
The proposed restructure will ensure
current level of service will be maintained.
62.00 2.5 On Track to be Delivered
Executive Director Kirsty Flanagan
DEG01 Feb-22 Development
and Economic
Growth
Economic Growth Crown Estate Administration Contribution
to Project Delivery
107.00 0.0 Delivered
FIS2324-001 Feb-23 Financial
Services
Treasury
Management
Service Concessions - Alteration to
accounting treatment to align the
repayment of borrowing relating to new
schools over their asset life.  Guidance
from Scottish Government now permits
this change of accounting treatment. 
Further detail will be provided to Council in
due course.
4,861.0 0.00 Delivered
FIS2324-002 Feb-23 Financial
Services
Revenues and
Benefits
The Service has identified savings
through rightsizing of budgets, an
organisational restructure with investment
in modern apprenticeships and temporary
staff designed to boost income from the
billing of additional local taxes and the
recovery of associated debt. In addition
efficiency savings from increased
productivity, increased levels of process
automation and moving more customers
to transact with the service over the
internet will allow previously outsourced
review works to be carried out internally.
466.00 3.0 On Track to be Delivered
R&I15 Feb-21 Roads and
Infrastructure
Roads and
Infrastructure
Emergency services support and fuel
provision from our fuel supplies
0.50 0.0 Still to be Implemented
202425 012 Feb-24 Roads and
Infrastructure
Roads and
Infrastructure
Services (RIS)
Review
A RIS Review was undertaken during
2023/24 and the implementation of the
outcomes will begin in 2024-25. It is
anticipated that further efficiency savings
will be achievable in future years but the
level of which are not known at this stage.
200.00 0.0 On Track to be Delivered
R&I09 Feb-21 Roads and
Infrastructure -
Operations
Roads and
Infrastructure -
Operations
Road inspections find and fix -  reduce
reactive work by proactivity. Moving to AI
technology as technology develops
40.00 1.0 On Track to be Delivered
RIS2324-001 Feb-23 Roads and
Infrastructure
Services
School Crossing
Patrollers
Support Communities to move to different
approaches to delivering School Crossing
Patrols through engagement with Parent
Council and Communities.
60.00 8.4 On Track to be Delivered
TB13b Feb-18 Roads and
Infrastructure
Services
Roads and
Infrastructure
Services
Roads & Amenity Services charging (non-
statutory services)
100.0 0.00 Will not be achieved
TB13b Feb-18 Roads and
Infrastructure
Services
Roads and
Infrastructure
Services
Roads & Amenity Services charging (non-
statutory services)
50.0 0.00 On Track to be Delivered
TB12b Feb-18 Roads and
Infrastructure
Services
Amenity Services Review charges for stadiums to enable
improvement work
30.00 0.0 Potential Shortfall
TB09 Feb-18 Roads and
Infrastructure
Services
Public Conveniences Public Conveniences - Progress
sustainable models including turnstiles
and franchising; establish simpler asset
transfer process
24.00 0.0 On Track to be Delivered
TOTAL 6,466.5 14.9
Template Ref Saving
Agreed
Service Service Delivery
Area
Savings Option Status of Implementation

Page 50

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE 
15 AUGUST 2024
FINANCIAL RISKS ANALYSIS 2024-25  
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to provide a summary of the key financial risks
facing the Council.   
1.2  A number of Council wide risks, both revenue and capital, have been identified
along with risks for each department and service of the Council.  For each
departmental risk the financial impact has been quantified and the likelihood
assessed based on the standard risk matrix. 
1.3 There are 7 Council wide revenue risks identified for 2024-25 currently amounting
to £3.592m. 
1.4 There are currently 42 departmental risks totalling £5.580m.  Of the 42
departmental risks, 5 are categorised as likely.   
1.5 The financial risks are monitored routinely and actions put in place to continue to
mitigate the risks.

Page 51

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE 
15 AUGUST 2024
FINANCIAL RISKS ANALYSIS 2024-25  
2. INTRODUCTION 
2.1 This report outlines the process and approach developed in carrying out a
financial risks analysis and provides a note of the current assessment of financial
risks for 2024-25. 
3 DETAIL 
3.1 Introduction 
3.1.1 The Council is currently in a period of significant financial challenge.  In
developing its budget to address both restricted resources and cost and demand
pressures there are a number of financial risks the Council needs to consider and
manage. 
3.1.2 There are a number of risks that affect the income or expenditure across the
whole council and these have been identified.  Financial risks have been
considered by each department and service of the Council.   
3.1.3 For each risk, the financial impact has been quantified and the likelihood
assessed based on the standard risk matrix as follows: 
1 – Remote
2 – Unlikely
3 – Possible
4 – Likely
5 – Almost Certain 
3.1.4 The Argyll and Bute Integrated Joint Board (IJB) with responsibility for Social
Work and a range of Health services was established and came into effect on 1
April 2016.  The IJB is responsible for financial and strategic oversight of these
services.  It is the responsibility of the IJB to consider the individual financial risks
associated with Integration Services and they are therefore not contained within
this report.  A Council wide risk has been included in respect of the IJB being
unable to deliver the social care service within the budget allocated. 
3.2 Council Wide Risks 
Revenue  
3.2.1 The 2024-25 budget includes a 3% pay award assumption for all staff groups. 
Negotiations on the 2024-25 award are in progress and it is likely that the Trade
Unions will looking to negotiate a deal at more than 3%.  However, the

Page 52

affordability for Local Government has to be considered and based on future
estimates, anything above a 3% pay award is deemed to be unaffordable, hence
why the budget outlook has been based on 3%.  This is a situation that will be
kept under close review as the pay negotiations advance during the year and the
assumption will be adjusted as required.  For each 1% more than the 3% built in,
there would be an additional cost of around £1.264m.  The financial risk is
recognised at £1.264m at this stage. Note that this is for SJC, Chief Officer and
Teaching Staff.  A risk in relation to Councillor pay is noted at section 3.2.4. 
3.2.2 Utility costs remain a volatile area and it is difficult to accurately predict how the
prices could vary.  With the volatility of utilities pricing it is very difficult to predict
the impact going forward but a financial risk based on a 10% variation on the
2023-24 actual spend plus 2024-25 non-pay inflation is £0.650m. 
3.2.3  The estimated level of council tax income is based on current and forecast Band
D equivalents and non-payment rates.  This reflects our most recent experience in
terms of the council tax base and likely collection rates.  A 1% variation in council
tax income amounts to approximately £0.633m. 
3.2.4 The Scottish Local Authorities Remuneration Committee (SLARC) have been
working on proposals in relation to Councillor Remuneration which would result in
increases to Councillor pay and a budget pressure of £0.178m for Argyll and Bute
if backdated to 1 April 2024.  The Scottish Government have indicated that they
would be open to agreeing the changes with an implementation date of 1 April
2025 but a recent COSLA Leaders update advised that a regulatory pathway
remains open for an uplift to be backdated to April 2024 subject to local
government funding. COSLA will continue to work with the Scottish Government
over the summer and a full paper will be taken to the COSLA Leadership
Sounding Board in August. 
3.2.5 At the budget meeting on 22 February 2024, the Council agreed 4 new policy
savings options that would deliver savings over the period 2024-25 to 2026-27. 
The savings to be delivered in 2024-25 amount to £0.665m.  Whilst the Council
have a good track record in delivering savings, a 10% shortfall on this savings
target would amount to £0.067m. 
3.2.6 In respect of the Health and Social Care Partnership, it is the responsibility of the
Chief Officer and Chief Financial Officer to manage the HSCP financial position. 
If an overspend is forecast, a budget recovery plan will be prepared and
submitted to the IJB, the Council and NHS Highland.  Where recovery plans are
unsuccessful and an overspend occurs at the financial year end, and the HSCP
has insufficient reserves to meet the overspend, then the partners will be required
to make additional payments to the HSCP.  Whilst any additional payments by the
Council and NHS Highland will be deducted from future years funding, there is still
a financial risk that the Council may have to pay out additional monies in year.  As
at 30 June 2024, the net HSCP outturn in 2024-25 is estimated to be a £1.176m
overspend (Social Work forecasting an overspend of £0.648m and an overspend
of £0.528m from Health).  As the IJB holds significant financial reserves, there is a
nil value on the risk.

Page 53

3.2.7 There is an ongoing requirement to fund unavoidable inflationary cost increases in
areas like fuel, food etc. Inflation has been falling and the Bank of England
estimates that it should continue to fall this year.  We will continue to closely
monitor the situation and update our financial forecasts using the best information
available to us. A 1% general inflation increase has been included with a financial
impact of £0.800m. 
3.2.8  The Council wide risks are noted within the table below.   
Description Likelihood Assessed
Financial Impact
£000
Pay Award Exceeding 3% 3 1,264
Energy costs increase by 20% greater
than anticipated
3 650
1% variation in Council Tax Income 2 633
Councillor Pay Changes 3 178
10% shortfall on Savings Options 2 67
IJB refer to Council for additional
funding to deliver social work services
1 0
1% variation of General Inflation Risk  4 800
Total  3,592 
Capital  
3.2.9 The finance settlement announcement on 19 December 2023 provided details of
the Local Government funding for 2024-25 and there is therefore certainty as to
what our funding is in respect of the General Capital Grant and the specific capital
grants already distributed. 
3.2.10  The capital plan for 2024-25 includes an estimate of £0.750m in respect of capital
receipts.   This is based on an assessment provided by the Special Projects Team
in January 2024.  A 10% variation equates to £0.075m and this would require to
be managed across the capital programme.   
3.2.11  General feedback from Scotland Excel and the Project Managers indicates that
price increases and uncertainty continue to be experienced as well as disruptions
to the supply chain and longer lead times, particularly in relation to the
construction sector and material availability. 
3.2.12  The increased rate of inflation impacts costs such as energy prices, labour,
packaging and transport. These all influence the overall contract price and make it
extremely challenging to manage expenditure and the availability of supply. 
3.2.13 While it has been possible to estimate the impact of these pressures on some
projects, and therefore either include those projections within the capital
monitoring report or adjust the capital programme accordingly, for others it is
more difficult, and no forecast has been projected at this stage but there are likely
to be further significant financial impacts not yet reported.

Page 54

3.3  Departmental/Service Risks 
3.3.1 The detail of each departmental financial risk is included within Appendix 1.  The
following table provides a summary of the number of risks within each department
and likelihood category with the financial impact. 
Department 1 - Remote 2 - Unlikely 3 - Possible 4 - Likely 5 - Almost
Certain Total
No £000 No £000 No £000 No £000 No £000 No £000
Chief Executive's
Unit 0 0 0 0 0 0 0 0 0 0 0 0
Executive Director
Douglas Hendry 2 20 6 560 9 730 3 435 0 0 20 1,745
Executive Director
Kirsty Flanagan 4 285 2 140 14 3,160 2 250 0 0 22 3,835
Total 6 305 8 700 23 3,890 5 685 0 0 42 5,580 
3.3.2 The current top three risks in terms of the financial impact are noted in the table
below. 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance -
Bridges, Culverts
& Sea Defences
Extreme localised weather may
result in loss of bridge, culvert,
road or sea defence.
3 750
Roads and
Infrastructure
Services
Waste PPP -
Indexation
Historical payments made
towards Waste PPP based on
indexation rates have been
challenged by Renewi resulting
in a potential cost to the council.
3 586
Financial
Services
Council Tax Debt
Collection
Recovery
Recovery of debt becomes more
difficult to pursue in the current
economic climate.  This is in
relation to historical debt that
has accumulated over many
years therefore any adverse
collection rates will impact on
the year end debt provision as
opposed to the in-year financial
position, hence no forecast
variance has been reported
within the current year.
3 345

Page 55

3.3.3 The risks which are likely, are noted below: 
SERVICE TITLE OF RISK DESCRIPTION OF RISK LIKELIHOOD FINANCIAL
IMPACT
£000
Council Wide
- Commercial
Services
Council Wide
Central
Repairs
Increased demands on
central repair budgets (CRA)
due to a decrease in Capital
funding, increase in statutory
and emergency repairs and
increases in
supplier/contractor charges. 
This impacts on all
departments of the Council
with a Central Repairs
Budget.
4 300
Development
and
Economic
Growth
Homelessness
Temporary
Accommodatio
n Income
Unpredictable number of
Homeless applications.
Inability to recover rent. 
Increase costs of property
maintenance and tenancy
change over.
4 150
Roads and
Infrastructure
Services
Fleet
Maintenance
Increased costs to maintain
internal fleet due to
inflationary increases on
vehicles parts.
4 100
Legal and
Regulatory
Support
NPDO –
Increase in
insurance
costs within
NPDO Schools
Increase in insurance costs
as a result of the long-term
effects of Covid-19 on the
insurance market and flood
claims.
4 75
Legal and
Regulatory
Support
Elections More than 1 by-election
required outwith standard
election cycle.
4 60 
3.4  Changes to Financial Risks since last report 
3.4.1 There have been 5 changes to the departmental risks since the financial risks
report was presented to Council on 22 February 2024: 
- A new ‘possible’ risk of £0.200m for Piers and Harbours Income to
recognise that changes to ferry services may result in reduced berthing
and passenger income.

Page 56

- A new ‘possible’ risk of £0.100m for Street Lighting to recognise that aging
lighting stock may require greater maintenance as health and safety
becomes a consideration
- A new ‘possible’ risk of £0.100m for Ferry Services to recognise that the
grant from Transport Scotland has not been increased for 2024-25 which
could result in additional costs for the Council to fund the Ferry Services.
- A new ‘possible’ risk of £0.100m for Fleet Maintenance to recognise there
may be increased costs to maintain internal fleet due to inflationary
increases on vehicle parts.
- The risk in relation to Contract RPI for NPDO and Hub Schools was
reduced from “likely” to “possible” as RPI has reduced. 
3.5 Monitoring of Financial Risks 
3.5.1  Financial risks will be reviewed and monitored on a two monthly basis and will be
included in the pack of financial reports submitted to Policy and Resources
Committee.    
3.6 Potential Future Risks 
3.6.1 Scottish Government are, over the next 2 years, proposing to extend funded
childcare to all 1 and 2 year olds across Scotland. This brings significant financial
and qualitative risks to the service. The needs and legislative requirements for this
age range would mean significant capital work across our estate and in many
settings there is not the space so extensions would be required. Having this age
range in the same play space as 3/4 year olds seriously impacts on the ability of
practitioners to effectively support age appropriate learning and play. It is
uncertain when this risk will arise. 
3.6.2 The Council’s bid to the Scottish Governments Learning Estate Investment
Programme (LEIP) for funding for a new school campus on Mull was successful
and a report was considered by Council on 24 April 2024.  Approval was granted
to utilise £5m of £9m previously earmarked funds to develop the Business Case. 
The Scottish Government will fund up to 50% of eligible costs and the estimated
cost is £43m, with £41m deemed eligible, however these are just estimates at this
stage.  Potential future risks could arise in relation to site selection, design,
construction and associated borrowing costs. 
3.6.3 In its present configuration, Argyll and Bute Council’s digital network does not
have the capacity to accommodate the requirements of the Education Services
vision nor the Scottish Government’s vision for digital access over the next four
years, including a device for every learner, which would entail a large increase in
the number of devices accessing the network. The network requires to be
redesigned to allow digital access on the scale proposed by the Scottish
Government. In addition to investment in bandwidth, device management and
protection, there is a requirement to replace existing network hardware in all
schools. Following an independent consultation on the network by Insight, IT and
Education have co-authored a paper “Resourcing Educations Digital Aspirations”
that identifies the work required to meet the Scottish Governments expectations.
COSLA have raised this issue with the Scottish Government and there is an

Page 57

expectation that this will be fully funded as it is a Scottish Government
commitment but there remains a risk associated with this.
4 CONCLUSION
4.1 This report summarises the key financial risks facing the Council.  There are 7
Council wide risks and 42 departmental risks identified with 5 categorised as
likely.  The financial risks are monitored routinely and actions put in place to
continue to mitigate the risks.   
5 IMPLICATIONS
5.1 Policy - None.
5.2 Financial - The financial value of each risk is included within the
appendix.   
5.3 Legal - None.
5.4 HR - None.
5.5 Fairer Scotland Duty - None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty - None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  Financial risks are detailed within the appendix.
5.8 Customer Service -  None. 
5.9 The Rights of the Child
(UNCRC) - 
None.
Kirsty Flanagan
Executive Director/Section 95 Officer
6 August 2024
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services
APPENDICES
Appendix 1 – Detail of Department/Service financial risks
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 58

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 30 JUNE 2024
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Commercial Services Catering Costs - Provision of
Meals to Early Years Children
The Children and Young People (Scotland) Act placed duties
on Councils to provide meals in an Early Years setting to
entitled children where sessions span over lunch time.  The
total quantum of grant funding is reducing and may not be
sufficient to fund the additional costs depending on uptake
and the additional costs to support the meal provision in
partner provider settings.
Joint strategy with procurement colleagues to reduce
potential impact of supplier charges.  Control food
wastage/portion controls.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Catering Purchases Increased supplier charges and higher than average inflation
on food costs.  In addition to this the Scottish Government
reviewed the regulations that govern the food and drinks
provided in schools and implemented revised regulations. 
The revised standards focus on reducing sugar, reducing red
processed meat and increasing fibre. Thus far, there has
been an increase in costs in produce and a reduction in
demand for school meals.
Joint strategy with procurement colleagues to reduce
potential impact of supplier charges.  Control food
wastage/portion controls; introduction of online ordering to
help manage food waste. Analysis and regular review of
menu choices.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Catering - Implementation of
Universal Free School Meals in
Primary Schools for P6 and P7
pupils
The Scottish Government may not give the local authority
adequate funds to support the policy to expand free school
meals in primary schools to include P6 and P7 pupils (the
scheme has already been implemented for P1 to P5 pupils).
Additionally, In 2023-24 Special Schools and Learning Centres
received FSM to S6 Level.  Although expansion paused for full
implementation for P6&7, FSM will be expanded through
entitlement to Scottish Child Payment and will be
implemented in February 2025.
Senior Manager connected into the ASSIST FM Committee
and will continue to ensure the Council's viewpoint will be
considered.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Rental Income from Properties Due to current economic climate, there may be reduced
ability to recover rental income from leased properties or
place suitable tenants in properties as leases come to an
end.
Management of leasehold properties by Estates team, any
issues with debt recovery being dealt with in line with Council
debt recovery policy.
2 60 2 60
Executive Director
Douglas Hendry
Commercial Services Surplus Properties Ongoing market difficulties lead to increased numbers of
surplus properties, in addition, as Our Modern Workspace
Project gains traction more properties will become surplus to
operational requirements. There are residual running costs
associated with all surplus properties.
One Council property team in place who will monitor market
conditions and work with prospective tenants/ purchasers to
let/sell surplus properties.
3 50 3 50
Executive Director
Douglas Hendry
Commercial Services Leisure Service Level
Agreements
Increase in RPI and/or other running costs (eg utilities,
payroll etc) resulting in requests for additional funding.
Monitoring annual alteration to contract RPI rate,
communication with service providers and mitigation through
financial forecasting and review of existing budget.
3 50 3 50
Executive Director
Douglas Hendry
Council Wide -
Commercial Services
Council Wide Central Repairs Increased demands on central repair budgets (CRA) due to a
decrease in Capital funding, increase in statutory and
emergency repairs and increases in supplier/contractor
charges.  This impacts on all departments of the Council with
a Central Repairs Budget.
Joint strategy with procurement colleagues to reduce
potential impact of supplier/contractor charges. Close
monitoring of central repairs budgets and commitments and
instructing only statutory tests/inspections and essential
repairs.
4 300 4 300
As at February 2024
(Budget Setting) As at 30 June 2024

Page 59

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Education ASN Support Demand for ASN support continues to increase. Scottish
Government statistics suggest a 3% year on year increase,
resulting in an additional resource requirement. Particularly
where gaps in our enhanced provision exist. The medium-
term detriments on the development of young children
which occurred as a consequence of service closures during
the COVID pandemic have increased demands on the service
as children require additional support to catch up.  The
Additional Support for Learning National Implementation
plan continues to inform our strategic direction in line with
the Angela Morgan Review.
Service is currently looking at alternative options for service
delivery to mitigate the inescapable pressures. Continuing to
ensure robust assessment of needs, monthly monitoring of
budget, any delays in recruitment factored into projections to
enable informed decision making on allocation of funding for
new/amended /additional support packages. Following a full
ASN review, the service are currently investing in the
development of four new learning centres in order to provide
greater equity in meeting the more complex needs of some
learners as well as considering plans to develop enhanced
wellbeing resources across our learning estate in future.  This
aims to reduce the frequency of children having to be
educated in high cost out of area placements.
3 200 3 200
Executive Director
Douglas Hendry
Education Pre-Five Units - retention of
partner providers
Failure in the commissioning or retention of pre-five partner
provider units to deliver 1140 hours would result in an
increased pressure on the Council to deliver the service.
Annual financial appraisal; Support network; Short-term cash
injections.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Children and Young People
(Scotland) Act - ELC 1140 hours
The Council has been required to deliver 1140 hours of Early
Learning and Childcare since August 2021. The Scottish
Government has committed to funding this and the Council
has revised its service model to align it to the Scottish
Government's reduced funding profile.  A risk remains that
actual costs of delivery exceed the Government Grant in any
given year.  For example, if child numbers are higher than
estimated, this may require additional staffing which has not
been built included in the staffing model funded by Scottish
Government.   Scottish Government has included within
scope for this parliamentary session plans to further expand
on eligibility for 1140 hours to all 2 year olds and some one
year olds. As yet there has been no funding commitment.
However this will place unknown cost pressures on both our
capital and revenue budgets
Continuous monitoring and review of the service model,
usage and resources.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Education (Scotland) Act
The Education (Scotland) Act 2000 requires Councils to
undertake assessments of the need for the provision of
Gaelic Medium Primary Education (GMPE) and the duty to
support and promote Gaelic Education. This may lead to
additional staffing requirements depending upon the
demand for Gaelic from parents.
Continuous monitoring and review of the service model and
resources available within budget.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Hub DBDA/DBFM Schools  -
Litigation
Increased risk of the requirement to litigate to conclude final
capital contract payments due.
Monitoring claims and mitigation through robust challenge of
any additional claims.
2 150 2 150
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Contract RPI for NPDO and Hub
Schools
Increase in RPI would result in higher costs. Monitoring annual alteration to contract RPI rate and
mitigation through financial forecasting and review of
existing budget.
4 100 3 100
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO - Increase in insurance
costs within NPDO Schools
Increase in insurance costs as a result of the long-term
effects of Covid-19 on the insurance market and flood claims.
Monitoring annual alteration to contract insurance rate and
mitigation through financial forecasting and review of
existing budget.
4 75 4 75
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Elections More than 1 by-election required outwith standard election
cycle.
Outwith direct management control. 4 60 4 60

Page 60

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services - Litigation Increased number of litigation cases. Ensure Legal Services are gateway to access all legal advice
and that advice is sought at earliest opportunity.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO/Hub DBFM contract
management efficiencies
Reduction in ability to generate contract management
efficiencies.
Monitoring annual efficiencies generated and mitigation
through robust contract management and application of
2 50 2 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Licensing Reduced numbers of licensing applications leading to
reduced income.
Monitoring of trends and reporting the financial impact in the
budget monitoring.
3 30 3 30
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Children's Panel Increased number of referrals increasing costs through
increases in the running costs.
Maximise the use of council facilities/resources for panel
session in the first instance.
1 10 1 10
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services Failure to minimise Council wide use of external legal advice. Ensure legal services are gateway to access all legal advice. 1 10 1 10
Executive Director
Kirsty Flanagan
Customer Support
Services
Software Licences Potential risk of being under licensed for software which will
be identified via software audits which would incur
additional costs.
ICT security and compliance officer in post and duties include
review of systems to ensure fully licenced. 
2 100 2 100
Executive Director
Kirsty Flanagan
Customer Support
Services
Additional Bandwidth for
Education
Additional costs required to be incurred in relation to
additional bandwidth required to deliver the Education
Digital Strategy due to a more digitalised learning curriculum.
Work closely with Education on Digital Devices for All
strategy to ensure necessary IT is in place.
3 50 3 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Homelessness Temporary
Accommodation Income
Unpredictable number of Homeless applications. Inability to
recover rent.  Increase costs of property maintenance and
tenancy change over.
Provision of Housing Options information and advice service
to minimise number of applicants proceeding to full
homeless application. Implementation of Rapid Rehousing
Plan.
4 150 4 150
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Dangerous Buildings
interventions
Building Standards having to deal with an increasing level of
dangerous building work which has significant financial
implications for Council.
Monitor activity and seek to recover costs from the owner. 3 100 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning Fee Penalties Potential that the Scottish Government may sanction
penalties due to poor performance by the Planning
Authority. The Scottish Government has recently appointed a
national Planning Performance Champion however the detail
of how this role intends to incentivise improvement/penalise
poor performance at a local authority level remains unclear
at this time
Maintain high levels of performance as articulated by
performance markers detailed in Planning Performance
Framework annual report.
1 100 1 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fee shortfalls Due to downturn in economic / building activity, in particular
renewable energy development and other major
developments could lead to planning fee income shortfalls
leading to revenue budget pressures.
Current income levels are looking more positive, however,
we are dependent on some high value applications coming in
which, if they don't materialise, will impact the overall
position.  Will continue to monitor Development
Management income and expenditure tightly and investigate
further income generation streams.
3 100 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Building Warrant fee shortfalls Due to loss of commercial income and downturn in economic
/ building activity, building warrant fee income shortfalls
leading to revenue budget pressures.
Continue to monitor Building Standards income and
expenditure tightly and investigate further income
generation streams.
1 50 1 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Environmental Health- export
certificates
Downturn in requests for export certificates as a result of UK
withdrawal from EU, changes to international trading
agreements or business economy. Reduction in demand
creates a budget pressure on environmental health budget.
Monitor income and resources required for export health
certificates / attestations required to support the export
market. Continue with food safety regulation activities
associated and support at 3rd country audits.  Pursue debt
2 40 2 40
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Animal Health Carrying out livestock seizure to protect welfare of the
animals
Monitor activity and seek to recover costs from the disposal
of the animals.
1 10 1 10

Page 61

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Kirsty Flanagan
Financial Services Council Tax Debt Collection
Recovery
Recovery of debt becomes more difficult to pursue in the
current economic climate.  This is in relation to historical
debt that has accumulated over many years therefore any
adverse collection rates will impact on the year end debt
provision as opposed to the in-year financial position, hence
no forecast variance has been reported within the current
year.
Robust monitoring of arrangements with debt collection
agency and performance against target collection rates.
3 345 3 345
Executive Director
Kirsty Flanagan
Financial Services Housing Benefit Subsidy Loss of Housing Benefit Subsidy due to exceeding LA error
threshold.
Processes in place for handling of claims accurately and
efficiently.
1 125 1 125
Executive Director
Kirsty Flanagan
Financial Services Sundry Debt Recovery Recovery of debt becomes more difficult to pursue in the
current economic climate. 
Additional staff are being put in place in the Sundry Debt
Team who will work jointly with Legal Services to enhance
the robustness of the Council's debt recovery processes.
3 85 3 85
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Roads Maintenance - Bridges,
Culverts & Sea Defences
Extreme localised weather may result in loss of bridge,
culvert, road or sea defence.
Routine inspections to deal with potential weak areas - based
on a stitch in time repair regime.
3 750 3 750
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Waste PPP - Indexation Historical payments made towards Waste PPP based on
indexation rates have been challenged by Renewi resulting in
a potential cost to the council.
Conversations are in place between Council and Renewi with
the aim of minimising the potential impact.
3 586 3 586
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Roads Maintenance - Roads
Network
Adverse weather conditions result in deterioration of the
road network necessitating greater spend on repair of
defects.
Manage maintenance budgets to ensure that spend is
prioritised to deal with safety defects.
3 230 3 230
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Car Parking Income Reduced number of visitors to the area and use of council
owned car parks resulting in a reduction in income.
Closely monitor income levels throughout the year, especially
in high visitor seasons.
3 200 3 200
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Piers & Harbours Income Changes to ferry services resulting in reduced berthing and
passenger income.
Closely monitor passenger number information coming from
CalMac to identify any emerging trends with reducing
passenger numbers.
3 200
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Waste - Compost Like Output
(CLO)
Compost Like Output is an element of waste that has been
heat treated and can only be used for landfill site restoration.
Renewi are currently producing more CLO than we need and
Discussions ongoing with Renewi and the Council on steps
forward and what element the council is responsible for.
3 164 3 164
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Winter Maintenance Adverse weather conditions which require greater than
budgeted number of gritting runs.
Monitor weather conditions and apply gritting policy to
minimise costs.
3 150 3 150
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Street Lighting Age of lighting stock requires greater maintenance as health
and safety becomes a consideration.
Manage maintenance budgets to ensure that spend is
prioritised to deal with safety defects.
3 100
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Ferry Services Grant from Transport Scotland covers the cost of running the
ferry services within Argyll and Bute which has not been
increased for 2024-25 which could result in additional costs
for the Council to fund the Ferry services.
Closely monitoring financial position throughout the year to
highlight any potential pressures.  Discussions will continue to
take place with Transport Scotland on an annual basis to
request additional funding that is required for that year.
3 100
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Fleet Maintenance Increased costs to maintain internal fleet due to inflationary
increases on vehicle parts.
Review of Fleet underway to determine where reductions
could possibly be made.
4 100
38 5,080 42 5,580

Page 62

ARGYLL AND BUTE COUNCIL  POLICY & RESOURCES COMMITTEE  
FINANCIAL SERVICES 15 AUGUST 2024 
CAPITAL BUDGET MONITORING REPORT – 30 JUNE 2024 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides an update on the position of the capital budget as at 30 June
2024. The report provides information on the financial position in respect of the
capital plan and the performance in terms of delivery of capital plan projects. 
1.2  Financial Position: 
 Current Year to Date – actual net expenditure to date is £4,869k compared
to a budget for the year to date of £4,814k resulting in an overspend for the
year to date of £55k (1.14%).
 Forecast Outturn for 2024-25 – forecast net expenditure for the full
financial year is £37,565k compared to an annual budget of £37,132k giving
rise to a forecast overspend for the year of £433k (1.17%).    
 Total Capital Plan – forecast total net project costs on the total capital plan
are £206,634k compared to a total budget for all projects of £206,201k giving
rise to a forecast overspend for the overall capital plan of £433k (0.21%). 
1.3 Project Delivery: 
 Asset Sustainability – Out of 97 projects there are 96 projects (99%) on
track, 1 project (1%) off track but recoverable and no projects off track (0%).
 Service Development - Out of 46 projects there are 42 projects (91%) on
track, 3 projects (7%) off track but recoverable and 1 project (2%) off track.
 Strategic Change – Out of 29 projects there are 28 projects (97%) on track,
1 project (3%) are off track but recoverable and no projects (0%) off track.  
1.4  The Capital Programme is funded by various income streams as detailed in
Appendix 4. Additional funding has been added: Allocation of Capital Contract
Increase Fund, Transport Scotland - Active Travel Funding, Scottish Government -
Nature Restoration, Strategic Housing Fund Contribution, Allocation of Inward
Investment Fund to Rural Growth Deal Projects and a revenue contribution from
DEG. 
1.5  The Council is projecting £750k of capital receipts this financial year. The estimated
level of receipts will be kept under review as market conditions change, as will
values following due diligence undertaken by prospective purchasers on the
condition of asset.

Page 63

ARGYLL AND BUTE COUNCIL  POLICY & RESOURCES COMMITTEE  
FINANCIAL SERVICES 15 AUGUST 2024 
CAPITAL BUDGET MONITORING REPORT – 30 JUNE 2024 
2.0 INTRODUCTION 
2.1 
2.2 
2.3 
2.4 
2.5 
2.6 
2.7 
This report provides an update on the position of the capital budget as at 30 June
2024. The report provides information on the financial position in respect of the capital
plan and the performance in terms of delivery of capital plan projects. 
Following the decision at Policy and Resources Committee on 9 December 2021, the
Rothesay Pavilion project was put on pause whilst potential funding options were
being considered. At the budget meeting in February 2023 additional funding was
allocated to this project which will allow the project to progress towards success by
supporting completion of certain work stages. The financial information included within
this report now includes amounts relating to Phase 1 of the Rothesay Pavilion project. 
Surveys have been completed in the Councils Learning Estates in relation to
RAAC with only 1 building confirmed as having it present with steps underway for its
removal. This will include a decant of the students for approximately 9 months plus
total removal and replacement of the roof during 2024. Funding of £3m was allocated
as part of the 2024-25 budget setting process. Additional funding of £406k has been
requested via the Capital Contract Increase Fund to meet the now increased contract
costs. 
The Councils bid to the Scottish Governments Learning Estate Investment Programme
(LEIP) for funding for a new school campus on Mull was successful. While this is good
news and will provide welcome investment in the school estate it does come with a
financial pressure that is required to be funded if the project is to proceed. The
Scottish Government will fund up to 50% of eligible costs therefore the Council will be
required to fund circa £20m. At April Council it was agreed to commence the Business
Case, undertake engagement, commence site selection processes and establish
governance arrangements. Any future capital budget provision will be built into future
budget estimates and approved as part of the budget setting process. 
A £1m cost pressure was identified during 2021-22 in relation to repairs to the A884
Ardbeg Sea Wall, where severe storm damage resulted in failure of the sea wall on
Bute. Emergency works were carried out and a permanent solution is currently being
developed. Additional funding of £1m was allocated for this purpose at the Council
meeting on 24 February 2022 however there remains a risk that costs will exceed this.
Feasibility report underway to progress the permanent works and estimated costs. 
The impact of the pandemic along with the UK exit from the European Union, the
Russian invasion of Ukraine and sanctions on Russian owned entities has seen
significant price increases as well as disruptions to the supply chain and longer lead in
times. The increased rate of inflation impacts costs such as energy prices, labour,
packaging and transport. These all have an effect on the overall contract price and
make it extremely challenging to manage expenditure and the availability of supply. 
As a result of this it should be noted that there are likely to be other significant financial
impacts which are not quantifiable at this stage, as follows: 
 Rothesay Pavilion – despite additional funding being awarded there remains a
funding gap to allow full completion of the original intended works. 
 Harbour Investment Programme – likely to be contractual cost increases in
future years (expected to be funded from increased fees and charges).

Page 64

2.8 
 Universal Free School Meals – delayed roll out to P6 and P7 and uncertain
capital funding levels available from the Scottish Government. 
 Bridges Fund - A scheme of bridge capital works was developed and 80%
funded through the Local Bridge Maintenance Fund with £5.450m of funding
approved. Increased capital contract costs from when the scheme was
developed to now, has the schemes costing approximately £12m. Discussions
are in place to request the original funding be approved to cover a smaller
scheme with less bridges. 
 In general, capital contracts across the programme are seeing significant price
increases. 
Although the direct impact of COVID on most local services has reduced or even
ceased altogether over the last 12 months, COVID-19 in conjunction with the UK exit
from the European Union and the Russian invasion of Ukraine, continues to affect
worldwide supply chains. 
In recent years additional funding of £11.100m has been allocated to the capital
programme for this purpose which has mitigated the impact to date however, as
detailed in the table below. With £8.834m already allocated or committed this results in
£2.266m of the fund remaining unallocated to projects facing inflationary pressures. 
Funding for Capital Inflationary Pressures £m
COVID-19 Funding 0.257
February 2021 Budget Meeting - Capital Cost Pressures 4.646
February 2022 Budget Meeting - Capital Cost Pressures 3.900
February 2023 Budget Meeting – Capital Projects Inflation
Pressures 2.000
February 2024 Budget Meeting  - Capital Cost Project Protection 0.297
Total Additional Funding Allocated to Capital 11.100
Allocated to Projects within Capital Programme (5.779)
Committed for future years (3.055)
Balance Remaining 2.266 
3.0  RECOMMENDATIONS 
3.1 Note the contents of this report and the financial summaries as detailed in Appendix 6.

Page 65

4.0 CURRENT YEAR TO DATE FINANCIAL POSITION 
4.1 
4.2
Overall Position 
Actual net expenditure to date is £4,869k compared to a budget for the year to date of
£4,814k resulting in an overspend for the year to date of £55k (1.14%). 
Project/Department Position 
The table below shows the year to date net expenditure against the year to date
budget by project type and service: 
Project Type:
Year to
Date
Budget    
£'000
Year to
Date
Actual    
£'000
Variance       
£'000
Asset Sustainability 2,426 2,427 (1)
Service Development 248 302 (54)
Strategic Change 2,140 2,140 0
Total  4,814 4,869 (55)
Service:      
ICT 186 186 0
Education 538 559 (21)
Live Argyll 367 367 0
Health & Social Care Partnership 514 514 0
Shared Offices 59 59 0
Roads & Infrastructure 1,929 1,963 (34)
Development & Economic Growth 248 248 0
CHORD 973 973 0
Total 4,814 4,869 (55) 
Material variances are explained in Appendix 1 and there are a number of small
variances contributing to the year to date overspend.

Page 66

5.0 FORECAST OUTTURN 2024-25 
5.1  Overall Position 
Forecast net expenditure for the full financial year is £37,565k compared to an annual
budget of £37,132k giving rise to a forecast overspend for the year of £433k (1.17%). 
5.2 Project/Department Position 
The table below shows the forecast expenditure and budget for the year by project type
and service. 
Project Type:
Annual
Budget            
£'000
Forecast
Outturn        
£'000 
Forecast
Variance         
£'000
Asset Sustainability 26,473 26,475 (2)
Service Development 6,431 6,818 (387)
Strategic Change 4,228 4,272 (44)
Total  37,132 37,565 (433)
Service:      
ICT 1,611 1,611 0
Education 7,790 7,823 (33)
Live Argyll 1,125 1,125 0
Health & Social Care Partnership 2,335 2,335 0
Shared Offices 2,596 2,596 0
Roads & Infrastructure 20,976 21,332 (356)
Development & Economic Growth 1,498 1,498 0
CHORD (799) (755) (44)
Total 37,132 37,565 (433) 
Material variances are explained in Appendix 2 and there are a number of smaller
variances contributing to the forecast overspend.

Page 67

6.0  TOTAL PROJECT COSTS 
6.1 Overall Position 
Forecast total net project costs on the total capital plan are £206,634k compared to a
total budget for all projects of £206,201k giving rise to a forecast overspend for the
overall capital plan of £433k (0.21%). 
6.2  Project/Department Position 
The table below shows the forecast expenditure and budget for the total capital plan
by project type and service. 
Project Type:
Capital
Plan
Budget           
£'000
Forecast
Project
Costs        
£'000 
Total
Capital
Plan
Variance         
£'000
Asset Sustainability 52,118 52,120 (2)
Service Development 28,171 28,558 (387)
Strategic Change 125,912 125,956 (44)
Total  206,201 206,634 (433)
Service:      
ICT 5,934 5,934 0
Education 44,329 44,362 (33)
Live Argyll 3,037 3,037 0
Health & Social Care Partnership 3,936 3,936 0
Shared Offices 22,957 22,957 0
Roads & Infrastructure 60,610 60,966 (356)
Development & Economic Growth 6,408 6,408 0
CHORD 58,990 59,034 (44)
Total 206,201 206,634 (433) 
Material variances are explained in Appendix 3 and there are a number of smaller
variances leading to the forecast overspend.

Page 68

7.0  TOTAL PROJECT PERFORMANCE 
7.1  Overall Position 
There are 172 projects within the Capital Plan, 166 are Complete or On Target, 5 are
Off Target and Recoverable and 1 project is Off Track.
7.2  Project Position 
The table below shows the Performance Status of the Projects in the Capital Plan. 
Project Type:
Complete/
On Target
Off Target/
Recoverable
Off
Target/
Problem Total
Asset Sustainability 96 1 0 97
Service Development 42 3 1 46
Strategic Change 28 1 0 29
Total 166 5 1 172
Service:        
ICT 7 0 0 7
Education 32 1 0 33
Live Argyll 21 0 0 21
Health & Social Care
Partnership 20 0 0 20
Shared Offices 25 0 0 25
Roads & Infrastructure 38 3 1 42
Development & Economic
Growth 18 0 0 18
CHORD 5 1 0 6
Total 166 5 1 172

Page 69

7.3  Chart of Performance Status 
The graph provides a view of the Performance Status of the Projects included in the
Capital Plan: 
8.0 OFF TRACK PROJECTS 
8.1  The Off-Track project is noted in the table below. 
Project Type Project What is Off
Track?
Explanation
RIS – Service
Development
October 2023
Weather Incident
Total
Expenditure
Increased costs for
permanent updates to
Kilmelford Bridge due to
additional rock armour to
protect upstream and
downstream embankment.

Page 70

9.0 
9.1 
STRATEGIC CHANGE PROJECTS 
Appendix 5 gives detailed information in respect of the Strategic Change Projects within
the Capital Plan. The appendix gives details of the forecast cost of each project against
the approved budget, the start and anticipated completion date of the project and an
assessment of the risks of the project and, if these are not green, gives an explanation
of the problem. 
10.0 
10.1 
CHANGES TO CAPITAL PLAN 
At this early stage of the financial year there are no proposed changes to the Capital
Plan in relation to slippages, accelerations and virements. 
The gross expenditure capital plan can be found in Appendix 7. 
11.0          FUNDING 
11.1 
12.0 
The Capital Programme is funded by various income streams as detailed in Appendix 4.
Additional funding has been added: Allocation of Capital Contract Increase Fund,
Transport Scotland - Active Travel Funding, Scottish Government - Nature Restoration,
Strategic Housing Fund Contribution, Allocation of Inward Investment Fund to Rural
Growth Deal Projects and a revenue contribution from DEG. 
IMPLICATIONS 
12.1 
12.2 
12.3 
12.4 
12.5 
12.6 
12.7 
12.8 
12.9
Policy – Monitors progress against the capital plan. 
Financial – Monitors funding and commitments of the capital plan. 
Legal – Available funding may not address all Statutory and Regulatory requirements in
relation to Health and Safety. 
HR – Available funding may have an impact on the sustainability of the Property Design
Team and Infrastructure Design Team. 
Fairer Scotland Duty – None. 
12.5.1     Equalities – protected characteristics – None. 
12.5.2     Socio-economic Duty – None. 
12.5.3     Islands – None. 
Climate Change – The Council is committed to addressing climate change via projects
within the capital plan. 
Risk – There are risks around increasing capital contract costs and the level and timing
of capital receipts. 
Customer Service – None. 
The Rights of the Child (UNCRC) - None.

Page 71

Kirsty Flanagan 
Executive Director / Section 95 Officer
06 August 2024
Policy Lead for Finance and Commercial Services – Councillor Ross Moreland
APPENDICES
- Appendix 1 – Year To Date finance variance explanations
- Appendix 2 – Forecast Outturn variance explanations
- Appendix 3 – Total Project finance variance explanations
- Appendix 4 – Capital Funding
- Appendix 5 – Cumulative spend, completion dates and risks relating
to significant capital projects.
- Appendix 6  - Financial Summary – Overall
- Financial Summary – Executive Director Douglas Hendry
- Financial Summary – Executive Director Kirsty Flanagan
- Appendix 7  - Capital Plan
For further information contact: Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 72

APPENDIX 1 – Year to Date Financial Variance Explanations
Listed below are the projects where the variance is +/- £50k.
Project
YTD
Budget
£’000
YTD
Actual
£’000
(Over)/
Under
Variance       
£’000
Explanation
Other variances under £50k   (55)          Total value of non-material variances less than +/-£50k
Total   (55)

Page 73

APPENDIX 2 – Outturn Variance Explanations
Listed below are the projects where the current year variance is +/- £50k. 
Project 
Annual
Budget
£’000
Outturn
£’000
Total
(Over)/
Under
Forecast
Variance         
£’000
Explanation
October 2023 Weather
Incident 4,348 4,634 (286) Increased costs for permanent updates to Kilmelford Bridge due to additional
rock armour to protect upstream and downstream embankment.
Other variances under £50k   (147) Total value of non-material variances less than +/-£50k.
Total  (433)

Page 74

APPENDIX 3 – Total Project Finance Variances
Listed below are the projects where the total project variance is +/- £50k. 
Project 
Capital
Plan
Budget
£’000
Forecast
Project
Costs
£’000
Total (Over)/
Under
Forecast
Variance         
£’000
Explanation
October 2023 Weather
Incident 4,348 4,634 (286) Increased costs for permanent updates to Kilmelford Bridge due to additional rock armour
to protect upstream and downstream embankment.
Other variances under £50k   (147)
Total value of non-material variances less than +/-£50k. Project Managers are working to
reduce these small individual overspends by identifying underspends elsewhere within the
capital plan.
Total  (433)

Page 75

CAPITAL PROGRAMME FUNDING Appendix 4
Estimated
Capital
Funding
Carry
Forwards
from 23-24
Slippage /
Acceleration
Additional
Funding
Updated Capital
Funding Available
Estimated
Capital
Funding
Carry
Forwards
from 23-24
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
Estimated
Capital
Funding
Carry
Forwards
from 23-24
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
General Capital Grant 9,042 0 0 0 9,042 9,069 0 0 629 9,698 8,834 0 0 0 8,834
Capital Grant - Area Control Accounts 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Transfer to Revenue for Private Sector Housing Grant (PSHG) -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033
Capital Receipts 750 -138 0 0 612 750 0 0 0 750 400 0 0 0 400
Flooding Allocation 156 0 0 0 156 156 0 0 0 156 0 0 0 0 0
Ring Fenced Capital Grant 379 0 0 0 379 618 650 0 0 1,268 0 0 0 0 0
Restricted Funding 2,553 5,140 0 972 8,665 84 6,573 0 28 6,685 0 0 0 0 0
Funded by Reserves 10,061 2,342 0 0 12,403 1,412 -92 0 0 1,320 -38 0 0 0 -38
Additional Funding from Revenue 0 0 0 4 4 0 0 0 0 0 0 0 0 0 0
Insurance 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Harbour Investment Programme 24,110 -60 0 0 24,050 39,000 -5,750 0 0 33,250 17,585 7,112 0 0 24,697
Prudential Borrowing 17,567 -1,334 0 0 16,233 166 1,600 0 0 1,766 376 -803 0 0 -427
Loans Fund Review 431 0 0 0 431 0 0 0 0 0 0 0 0 0 0
COVID Funding 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
64,016 5,950 0 976 70,942 50,222 2,981 0 657 53,860 26,124 6,309 0 0 32,433
BREAKDOWN OF ADDITIONAL FUNDING
Additional Funding 2024-25 2025-26 2026-27 Reported Source
Capital Contract Increase Fund 706 28 June - 2024-25 Restricted Funds
Transport Scotland Active Travel 395 June - 2024-25 Scottish Government
Nature Restoration Fund 234 June - 2024-25 Scottish Government
Strategic Housing Fund Contribution 250 June - 2024-25 Restricted Funds
Inward Investment Fund allocation to RGD Projects 16 June - 2024-25 Restricted Funds
Revenue Contribution 4 June - 2024-25 Revenue
2025-26 2026-272024-25

Page 76

Strategic Change Projects - Cumulative Spend, Start/Finish Dates and Project Risks APPENDIX 5
Strategic Change Projects
Prior Years
Spend
£'000
Current Year
Forecast
£'000
Total Project
Forecast
£'000
Total Project
Budget
£'000
Project Start
Date
Estimated
Completion
Date
Project
Risks
Identified Explanation
Campbeltown Flood Scheme 13,748 1,780 15,925 15,925 01/08/2016 31/03/2025 Green
CHORD Oban 7,326 500 7,905 7,905 27/10/2016 31/03/2026 Green Issues with contract close out impacting on timescales.
CHORD Rothesay 21,046 2,655 23,701 23,657 tbc tbc Amber Project recommenced and awaiting Rural Growth Deal acceptance.
Harbour Investment Programme 9,295 24,093 91,335 91,335 01/04/2017 31/03/2028 Green
Dunoon Primary 10,637 232 10,869 10,869 18/12/2014 30/04/2020 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Replacement of Oban High 2,844 406 3,250 3,250 24/04/2014 31/01/2019 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Clean Energy - NDEEF1 1,109 222 1,331 1,331 tbc 31/03/2025 Green
Clean Energy - NDEEF2 0 590 1,140 1,140 tbc 31/03/2027 Green
Street Lighting LED Replacement 3,279 621 3,900 3,900 01/08/2016 31/12/2025 Green Tender for final package of works still to be awarded.
Helensburgh Waterfront Development 24,111 281 24,392 24,392 01/04/2017 31/03/2025 Green Physically complete, retentions outstanding
TIF - Halfway House Roundabout 66 287 640 640 tbc tbc Green Scope of project still to be determined - budget to be reprofiled.
Kirn Primary School 10,085 34 10,119 10,119 24/04/2014 31/10/2017 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Helensburgh Office Rationalisation 11,538 300 11,838 11,838 25/04/2013 31/12/2022 Green Physically complete - project subject to legal dispute.
Carbon Management Business Cases 201 0 201 201 01/02/2014 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Carbon Management - Group Heating Conversion Project 1,938 0 1,938 1,938 01/02/2016 31/12/2022 Green Project complete in full - no further expenditure expected.
CHORD Dunoon 12,499 23 12,522 12,522 03/02/2012 09/03/2018 Green Physically complete - negotiations with contractor regarding potential construction defect.
NPDO Schools Solar PV Panel Installations 761 0 761 761 26/06/2014 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Non NPDO Schools Solar PV Panel Installations 400 0 400 400 20/03/2014 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Carbon Management Capital Property Works 2016/17 19 0 19 19 01/02/2016 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Oil to Gas Heating Conversions 182 0 182 182 01/02/2012 31/12/2022 Green Budget to be reprofiled pending development of new projects.
Kilmory Business Park Phase 2AA 60 1,035 1,129 1,129 01/02/2022 01/09/2025 Green Development Agreement still to be concluded.
Carbon Management - Non Education 29 21 50 50 01/04/2015 31/12/2025 Green Projects being determined.
Dunoon Pier OBC 2,844 0 2,844 2,844 03/02/2012 26/02/2016 Green Project complete.
Campbeltown Office Rationalisation 595 1 596 596 01/02/2015 31/03/2019 Green Project complete in full - no further expenditure expected.
TIF - Oban Airport Business Park 505 85 590 590 22/01/2015 31/12/2025 Green
Campbeltown Schools Redevelopment 2,092 38 2,130 2,130 16/02/2012 30/11/2018 Green Physically complete - negotiations with contractor delaying payment of financial sums outstanding.
CHORD - Helensburgh 6,532 25 6,557 6,557 29/09/2011 30/04/2015 Green Main contract complete. Art project proposed for 24-25.
TIF - North Pier Extension 214 0 214 214 06/12/2017 06/12/2021 Green Work to date complete - on going discussions regarding future of project.
TIF - Lorn/Kirk Road 2,169 1 2,170 2,170 22/01/2015 31/03/2021 Green Project complete in full - no further expenditure expected.
Carbon Management Fuel Conversions 107 0 107 107 01/02/2014 31/03/2019 Green Project complete in full - no further expenditure expected.
Kilmory Biomass  Carbon Management 956 0 956 956 20/09/2012 31/03/2019 Green Project complete in full - no further expenditure expected.
Net Zero 0 366 366 366 tbc tbc Green
Strategic Change Total 147,187 33,596 240,077 240,033
Project Risk Classifications:
Green - Risks can be managed and are viewed as stable or reducing.
Amber - Risks are increasing but are still manageable.
Red - Risks are increasing or have increased to such an extent they may affect delivery of the project.
Capital Expenditure Dates Risks

Page 77

ARGYLL AND BUTE COUNCIL - CAPITAL PLAN MONITORING REPORT - OVERALL COUNCIL Appendix 6
FINANCIAL SUMMARY - NET EXPENDITURE
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance Budget 2025-26
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Executive Director Douglas Hendry 1,478 1,479 (1) 13,013 13,014 (1) 22,107 22,108 (1)
Executive Director Kirsty Flanagan 948 948 0 15,848 15,849 (1) 33,099 33,100 (1)
Asset Sustainability Total 2,426 2,427 (1) 28,861 28,863 (2) 55,206 55,208 (2)
Service Development Projects
Executive Director Douglas Hendry 0 20 (20) 193 225 (32) 16,426 16,458 (32)
Executive Director Kirsty Flanagan 1,678 1,712 (34) 12,650 13,005 (355) 45,075 45,430 (355)
Service Development Total 1,678 1,732 (54) 12,843 13,230 (387) 61,501 61,888 (387)
Strategic Change Projects
Campbeltown Schools Redevelopment 0 0 0 38 38 0 2,130 2,130 0
Dunoon Primary 0 0 0 232 232 0 10,869 10,869 0
Replacement of Oban High 0 0 0 406 406 0 3,250 3,250 0
Kirn Primary School 0 0 0 34 34 0 10,119 10,119 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Carbon Management Business Cases 0 0 0 0 0 0 201 201 0
NPDO Schools Solar PV Panel Installations 0 0 0 0 0 0 761 761 0
Non NPDO Schools Solar PV Panel Installations 0 0 0 0 0 0 400 400 0
Carbon Management Fuel Conversions 0 0 0 0 0 0 107 107 0
Carbon Management Capital Property Works 2016/17 0 0 0 0 0 0 19 19 0
Carbon Management - Group Heating Conversion Project 0 0 0 0 0 0 1,938 1,938 0
Kilmory Biomass  Carbon Management 0 0 0 0 0 0 956 956 0
Oil to Gas Heating Conversions 0 0 0 0 0 0 182 182 0
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 0 0 0 300 300 0 11,838 11,838 0
Clean Energy - NDEEF1 0 0 0 222 222 0 1,331 1,331 0
Clean Energy - NDEEF2 0 0 0 590 590 0 1,140 1,140 0
Net Zero 0 0 0 366 366 0 366 366 0
Campbeltown Flood Scheme 1,167 1,167 0 1,780 1,780 0 15,925 15,925 0
Street Lighting LED Replacement 0 0 0 621 621 0 3,900 3,900 0
Harbour Investment Programme 1,149 1,149 0 24,050 24,050 0 91,292 91,292 0
Harbour Investment Programme Non - PB 0 0 0 43 43 0 43 43 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - North Pier Extension 0 0 0 0 0 0 214 214 0
TIF - Oban Airport Business Park 0 0 0 85 85 0 590 590 0
TIF - Halfway House Roundabout 0 0 0 287 287 0 640 640 0
CHORD - Helensburgh 0 0 0 25 25 0 6,557 6,557 0
CHORD Dunoon 0 0 0 23 23 0 12,522 12,522 0
CHORD Oban 0 0 0 500 500 0 7,905 7,905 0
CHORD Rothesay 956 956 0 2,611 2,655 (44) 23,657 23,701 (44)
Helensburgh Waterfront Development 15 15 0 281 281 0 24,392 24,392 0
HWD - FFE (Funded by LA) 0 0 0 34 34 0 350 350 0
Kilmory Business Park Phase 2AA 2 2 0 1,035 1,035 0 1,129 1,129 0
Dunoon Pier OBC 0 0 0 0 0 0 2,844 2,844 0
Strategic Change Total 3,289 3,289 0 33,586 33,630 (44) 240,383 240,427 (44)
Total Expenditure 7,393 7,448 (55) 75,290 75,723 (433) 357,090 357,523 (433)
68,275
INCOME
Asset Sustainability
Executive Director Douglas Hendry 0 0 0 (1,570) (1,570) 0 (2,270) (2,270) 0
Executive Director Kirsty Flanagan 0 0 0 (818) (818) 0 (818) (818) 0
Asset Sustainability Total 0 0 0 (2,388) (2,388) 0 (3,088) (3,088) 0
Service Development Projects
Executive Director Douglas Hendry 0 0 0 0 0 0 (7,771) (7,771) 0
Executive Director Kirsty Flanagan (1,430) (1,430) 0 (6,412) (6,412) 0 (25,559) (25,559) 0
Service Development Total (1,430) (1,430) 0 (6,412) (6,412) 0 (33,330) (33,330) 0
Strategic Change Projects
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary 0 0 0 0 0 0 (137) (137) 0
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (1,149) (1,149) 0 (24,050) (24,050) 0 (91,292) (91,292) 0
01 TIF - Lorn/Kirk Road 0 0 0 0 0 0 (2,057) (2,057) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (2,320) (2,320) 0 (7,979) (7,979) 0
HWD - FFE (Funded by LA) 0 0 0 0 0 0 (350) (350) 0
Rothesay CHORD 0 0 0 (2,009) (2,009) 0 (8,854) (8,854) 0
Kilmory Business Park Phase 2AA 0 0 0 (829) (829) 0 (829) (829) 0
Kilmory Business Park Phase 2AA - HIE 0 0 0 (150) (150) 0 (150) (150) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Strategic Change Total (1,149) (1,149) 0 (29,358) (29,358) 0 (114,471) (114,471) 0
Total Income (2,579) (2,579) 0 (38,158) (38,158) 0 (150,889) (150,889) 0
Net Total 4,814 4,869 (55) 37,132 37,565 (433) 206,201 206,634 (433)
Full Year This Financial Year Total Project Costs
30 June 2024

Page 78

MONITORING REPORT
Budget Actual Variance Budget Forecast Variance Budget Forecast Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability
Education 538 539 (1) 7,066 7,067 (1) 12,114 12,115 (1)
Live Argyll 367 367 0 1,104 1,104 0 1,741 1,741 0
Health and Social Care Partnership 514 514 0 3,722 3,722 0 4,777 4,777 0
Shared Offices 59 59 0 1,121 1,121 0 3,475 3,475 0
Asset Sustainability Total 1,478 1,479 (1) 13,013 13,014 (1) 22,107 22,108 (1)
Service Development Projects
Ardrishaig Primary Pre 5 Unit 0 0 0 0 0 0 2 2 0
Bowmore Primary School - Pre 5 Unit 0 0 0 0 0 0 149 149 0
Clyde Cottage - 600 hour provision 0 0 0 0 0 0 556 556 0
Craignish Primary School - Pre 5 Extension 0 0 0 0 0 0 400 400 0
Iona Primary School - Pre 5 Unit 0 0 0 0 0 0 490 490 0
Islay High and Rosneath Primary School Pitches 0 0 0 0 0 0 719 719 0
Lochgoilhead Primary School - Pre 5 Unit 0 0 0 0 0 0 391 391 0
Park Primary Extension/Pre Fives Unit 0 0 0 0 0 0 341 341 0
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 491 491 0
Bunessan Primary School - Gaelic Medium Improvements 0 0 0 0 0 0 120 120 0
Early Learning and Childcare 0 0 0 0 0 0 850 850 0
Early Learning and Childcare - 1140 Hours 0 20 (20) (12) 20 (32) 7,762 7,794 (32)
CO2 Monitoring - Covid Mitigation in Schools 0 0 0 113 113 0 192 192 0
Early Learning and Childcare - 1140 Hours - CFCR 0 0 0 0 0 0 1,379 1,379 0
Bowmore Primary School - Gaelic Medium Grant 0 0 0 38 38 0 38 38 0
Riverside Leisure Centre Refurbishment 0 0 0 0 0 0 1,246 1,246 0
Dunclutha Childrens Home 0 0 0 54 54 0 1,300 1,300 0
Service Development Total 0 20 (20) 193 225 (32) 16,426 16,458 (32)
Strategic Change Projects
Campbeltown Schools Redevelopment 0 0 0 38 38 0 2,130 2,130 0
Dunoon Primary 0 0 0 232 232 0 10,869 10,869 0
Replacement of Oban High 0 0 0 406 406 0 3,250 3,250 0
Kirn Primary School 0 0 0 34 34 0 10,119 10,119 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Carbon Management Business Cases 0 0 0 0 0 0 201 201 0
NPDO Schools Solar PV Panel Installations 0 0 0 0 0 0 761 761 0
Non NPDO Schools Solar PV Panel Installations 0 0 0 0 0 0 400 400 0
Carbon Management Fuel Conversions 0 0 0 0 0 0 107 107 0
Carbon Management Capital Property Works 2016/17 0 0 0 0 0 0 19 19 0
Carbon Management - Group Heating Conversion Project 0 0 0 0 0 0 1,938 1,938 0
Kilmory Biomass  Carbon Management 0 0 0 0 0 0 956 956 0
Oil to Gas Heating Conversions 0 0 0 0 0 0 182 182 0
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 0 0 0 300 300 0 11,838 11,838 0
Clean Energy - NDEEF1 0 0 0 222 222 0 1,331 1,331 0
Clean Energy - NDEEF2 0 0 0 590 590 0 1,140 1,140 0
Net Zero 0 0 0 366 366 0 366 366 0
CHORD Oban 0 0 0 500 500 0 7,905 7,905 0
CHORD Rothesay 956 956 0 2,611 2,655 (44) 23,657 23,701 (44)
CHORD - Helensburgh 0 0 0 25 25 0 6,557 6,557 0
CHORD Dunoon 0 0 0 23 23 0 12,522 12,522 0
Helensburgh Waterfront Deveopment 15 15 0 281 281 0 24,392 24,392 0
HWD - FFE (Funded by LA) 0 0 0 34 34 0 350 350 0
Kilmory Business Park Phase 2AA 2 2 0 1,035 1,035 0 1,129 1,129 0
Dunoon Pier OBC 0 0 0 0 0 0 2,844 2,844 0
Strategic Change Total 973 973 0 6,719 6,763 (44) 125,609 125,653 (44)
Total Expenditure 2,451 2,472 (21) 19,925 20,002 (77) 164,142 164,219 (77)
INCOME
Asset Sustainability
Education 0 0 0 (125) (125) 0 (125) (125) 0
Health and Social Care Partnership 0 0 0 (1,441) (1,441) 0 (2,141) (2,141) 0
Shared Offices 0 0 0 (4) (4) 0 (4) (4) 0
Asset Sustainability Total 0 0 0 (1,570) (1,570) 0 (2,270) (2,270) 0
Service Development Projects
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 (485) (485) 0
Bunessan Primary School - Gaelic Medium Improvements 0 0 0 0 0 0 (30) (30) 0
Early Learning and Childcare 0 0 0 0 0 0 (918) (918) 0
Early Years 1140 Hours 0 0 0 0 0 0 (6,300) (6,300) 0
Bowmore Primary School - Gaelic Medium Grant 0 0 0 0 0 0 (38) (38) 0
Service Development Total 0 0 0 0 0 0 (7,771) (7,771) 0
Strategic Change
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary School 0 0 0 0 0 0 (137) (137) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (2,320) (2,320) 0 (7,979) (7,979) 0
HWD - FFE (Funded by LA) 0 0 0 0 0 0 (350) (350) 0
Rothesay CHORD 0 0 0 (2,009) (2,009) 0 (8,854) (8,854) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Kilmory Business Park Phase 2AA 0 0 0 (829) (829) 0 (829) (829) 0
Kilmory Business Park Phase 2AA - HIE 0 0 0 (150) (150) 0 (150) (150) 0
Strategic Change Total 0 0 0 (5,308) (5,308) 0 (20,852) (20,852) 0
Total Income 0 0 0 (6,878) (6,878) 0 (30,893) (30,893) 0
Net Departmental Total 2,451 2,472 (21) 13,047 13,124 (77) 133,249 133,326 (77)
30 June 2024
Total Project CostsFull Year This Financial YearCurrent Financial Year To Date
Appendix 6
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR DOUGLAS HENDRY

Page 79

MONITORING REPORT
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget
Year End
Forecast
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Roads & Infrastructure Services 778 778 0 14,579 14,580 (1) 29,921 29,922 (1)
Customer Support Services 170 170 0 1,269 1,269 0 3,178 3,178 0
Asset Sustainability Total 948 948 0 15,848 15,849 (1) 33,099 33,100 (1)
Service Development Projects
Preliminary design for  Regional Transport projects 0 0 0 16 16 0 221 221 0
Campbeltown Old Quay 0 0 0 0 0 0 1,381 1,381 0
Fleet Management - Prudential Borrowing 1,399 1,399 0 2,152 2,152 0 4,826 4,826 0
Fleet Management 0 0 0 258 258 0 4,760 4,760 0
Public Transport Operation Vehicles 0 0 0 233 233 0 233 233 0
Oban Bus Congestion - Bus Partnership Fund 0 0 0 0 0 0 50 50 0
Lismore Ferry 0 0 0 35 35 0 672 672 0
Oban Depot Development Project 0 0 0 (35) 0 (35) 2,189 2,224 (35)
Lochgilphead Depot Rationalisation 15 49 (34) 15 49 (34) 169 203 (34)
Jackson's Quarry Refurbishment 0 0 0 0 0 0 285 285 0
Weather Incident October 2023 0 0 0 4,348 4,634 (286) 4,348 4,634 (286)
Witchburn Road Demolition 0 0 0 0 0 0 158 158 0
Safe Streets, Walking and Cycling (CWSS) 0 0 0 619 619 0 4,157 4,157 0
SPT - bus infrastructure 0 0 0 25 25 0 1,430 1,430 0
Cycleways - H&L (FSPT) 0 0 0 497 497 0 3,402 3,402 0
Helensburgh Public Realm - Arts Strategy Fund 0 0 0 25 25 0 53 53 0
Town Centre Funds 9 9 0 334 334 0 4,329 4,329 0
Rural Growth Deal 161 161 0 268 268 0 507 507 0
Dunoon Cycle Bothy 28 28 0 80 80 0 563 563 0
Dunoon STEM Hub 7 7 0 2,427 2,427 0 2,558 2,558 0
Ardrishaig North Active Travel 3 3 0 49 49 0 880 880 0
Nature Restoration Fund 0 0 0 835 835 0 1,069 1,069 0
Gibraltar Street Public Realm Improvements 36 36 0 97 97 0 250 250 0
Hermitage Park 0 0 0 26 26 0 3,388 3,388 0
Glenmorag Car Park 4 4 0 4 4 0 4 4 0
Applications Projects 16 16 0 342 342 0 3,193 3,193 0
Service Development Total 1,678 1,712 (34) 12,650 13,005 (355) 45,075 45,430 (355)
Strategic Change Projects
Campbeltown Flood Scheme 1,167 1,167 0 1,780 1,780 0 15,925 15,925 0
Street Lighting LED Replacement 0 0 0 621 621 0 3,900 3,900 0
Harbour Investment Programme 1,149 1,149 0 24,050 24,050 0 91,292 91,292 0
Harbour Investment Programme - Non PB 0 0 0 43 43 0 43 43 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - North Pier Extension 0 0 0 0 0 0 214 214 0
TIF - Oban Airport Business Park 0 0 0 85 85 0 590 590 0
TIF - Halfway House Roundabout 0 0 0 287 287 0 640 640 0
Strategic Change Total 2,316 2,316 0 26,867 26,867 0 114,774 114,774 0
Total Expenditure 4,942 4,976 (34) 55,365 55,721 (356) 192,948 193,304 (356)
INCOME
Asset Sustainability
Roads & Infrastructure Services 0 0 0 (818) (818) 0 (818) (818) 0
Asset Sustainability Total 0 0 0 (818) (818) 0 (818) (818) 0
Service Development Projects
Applications Projects 0 0 0 0 0 0 (437) (437) 0
Safe Streets, Walking and Cycling 0 0 0 (376) (376) 0 (2,988) (2,988) 0
SPfT 0 0 0 (25) (25) 0 (1,268) (1,268) 0
Cycleways - H&L (FSPT) 0 0 0 (500) (500) 0 (3,502) (3,502) 0
Town Centre Funds 0 0 0 (512) (512) 0 (2,730) (2,730) 0
Rural Growth Deal 0 0 0 (396) (396) 0 (507) (507) 0
Dunoon STEM Hub 0 0 0 (2,050) (2,050) 0 (2,558) (2,558) 0
Ardrishaig North Active Travel 0 0 0 0 0 0 (50) (50) 0
Dunoon Cycle Bothy 0 0 0 (298) (298) 0 (563) (563) 0
Gibraltar Street Public Realm Improvements 0 0 0 0 0 0 (250) (250) 0
Hermitage Park 0 0 0 0 0 0 (3,319) (3,319) 0
Glenmorag Car Park 0 0 0 (4) (4) 0 (4) (4) 0
Fleet Management - PB (1,399) (1,399) 0 (2,152) (2,152) 0 (4,826) (4,826) 0
Fleet Management 0 0 0 0 0 0 (49) (49) 0
Millpark Depot Demolition Insurance 0 0 0 0 0 0 (53) (53) 0
Oban Depot - Mill Park Insurance Claim 0 0 0 0 0 0 (1,681) (1,681) 0
Oban Depot - Revenue Contribution 0 0 0 (67) (67) 0 (67) (67) 0
Lismore Ferry 0 0 0 0 0 0 (500) (500) 0
Witchburn Road Demolition 0 0 0 0 0 0 (157) (157) 0
Oban Bus Congestion - Bus Partnership Fund (31) (31) 0 (32) (32) 0 (50) (50) 0
Service Development Total (1,430) (1,430) 0 (6,412) (6,412) 0 (25,559) (25,559) 0
Strategic Change Projects
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (1,149) (1,149) 0 (24,050) (24,050) 0 (91,292) (91,292) 0
01 TIF - Lorn/Kirk Road 0 0 0 0 0 0 (2,057) (2,057) 0
Strategic Change Total (1,149) (1,149) 0 (24,050) (24,050) 0 (93,619) (93,619) 0
Total Income (2,579) (2,579) 0 (31,280) (31,280) 0 (119,996) (119,996) 0
Net Departmental Total 2,363 2,397 (34) 24,085 24,441 (356) 72,952 73,308 (356)
30 June 2024
Full Year This Financial Year Total Project Costs
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR KIRSTY FLANAGAN
Appendix 6

Page 80

CAPITAL PLAN 2024-25 APPENDIX 7
Overall Summary
Service
Previous
Years
£000s
2024-25              
£000s
2025-26                
£000s
2026-27                 
£000s
2027-28                
£000s
Total
£000s
Education 39,399 7,915 3,060 1,988 0 52,362
Shared Offices 17,806 2,600 2,522 382 0 23,310
ICT 2,851 1,611 1,221 688 0 6,371
RIS 38,592 48,095 44,779 28,907 0 160,373
DEG 19,604 5,659 941 0 0 26,204
HSCP 1,246 3,776 1,055 0 0 6,077
Live Argyll 1,275 1,125 169 468 0 3,037
CHORD 74,734 4,509 113 0 0 79,356
Overall Total 195,507 75,290 53,860 32,433 0 357,090

Page 81

CAPITAL PLAN 2024-25 APPENDIX 7
Education
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26                
£000s
2026-27            
£000s
2027-28            
£000s
Total
£000s
Asset Sustainability Education Asbestos Control/Removal Works 0 0 0 0 0 0
Block Allocation - Education 0 568 520 1,988 0 3,076
Digital Inclusion 20-21 0 9 0 0 0 9
Free School Meals 0 0 434 0 0 434
Primary Schools 0 3,013 1,280 0 0 4,293
Primary Schools - CFCR 0 0 0 0 0 0
School Houses - Housing Quality Standard 0 0 0 0 0 0
Secondary Schools 0 1,086 226 0 0 1,312
Asset Sustainability Total 0 7,066 3,060 1,988 0 12,114
Service Development Education Ardrishaig Primar School - Pre Five Extension 2 0 0 0 0 2
Bowmore Primary School - Gaelic Medium Grant 0 38 0 0 0 38
Bowmore Primary School - Pre Five Unit 149 0 0 0 0 149
Bunessan Primary School - Gaelic Medium Improvements 120 0 0 0 0 120
Clyde Cottage - 600 hours provision 556 0 0 0 0 556
CO2 Monitoring - Covid Mitigation in Schools 79 113 0 0 0 192
Craignish Primary School - Pre Five Extension (600 hours funding) 400 0 0 0 0 400
Early Learning and Childcare 850 0 0 0 0 850
Early Learning and Childcare - 1140 Hours 7,774 -12 0 0 0 7,762
Early Learning and Childcare - 1140 Hours - CFCR 1,379 0 0 0 0 1,379
Iona Primary School - Pre Five Unit (600 hours funding) 490 0 0 0 0 490
Islay High & Rosneath PS Pitches 719 0 0 0 0 719
Lochgoilhead Primary School - Pre Five Unit (600 hours funding) 391 0 0 0 0 391
Park Primary Extension and Pre Fives Unit 341 0 0 0 0 341
Sandbank Gaelic Pre Five Unit 491 0 0 0 0 491
Service Development Total 13,741 139 0 0 0 13,880
Strategic Change Education Campbeltown Schools Redevelopment 2,092 38 0 0 0 2,130
Dunoon Primary School 10,637 232 0 0 0 10,869
Kirn Primary School 10,085 34 0 0 0 10,119
Replacement of Oban High School 2,844 406 0 0 0 3,250
Strategic Change Total 25,658 710 0 0 0 26,368
Overall Total 39,399 7,915 3,060 1,988 0 52,362

Page 82

CAPITAL PLAN 2024-25 APPENDIX 7
Shared Office
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26      
£000s
2026-27        
£000s
2027-28    
£000s
Total
£000s
Asset Sustainability Shared Offices 52 Sinclair Street Flats - CFCR 0 0 0 0 0 0
5-7 East Clyde Street - Coastal Communities Fund 0 0 0 0 0 0
Block Allocation 0 320 427 382 0 1,129
Burnett Building 0 107 0 0 0 107
Helensburgh and Lomond Civic Centre 0 140 0 0 0 140
Kilmory Castle 0 0 1,545 0 0 1,545
Legionella Control Works 0 12 0 0 0 12
Our Modern Workspace 0 542 0 0 0 542
Asset Sustainability Total 0 1,121 1,972 382 0 3,475
Strategic Change Shared Offices Campbeltown Office Rationalisation 595 1 0 0 0 596
Carbon Management - Group Heating Conversion Project (Prudential Borrowing)1,938 0 0 0 0 1,938
Carbon Management Business Cases (FPB) 201 0 0 0 0 201
Carbon Management Capital Property Works 16/17 19 0 0 0 0 19
Carbon Management Fuel Conversions (FPB) 107 0 0 0 0 107
Clean Energy - NDEEF1 1,109 222 0 0 0 1,331
Clean Energy - NDEEF2 0 590 550 0 0 1,140
Helensburgh Office Rationalisation  (FPB,REC) 11,538 300 0 0 0 11,838
Kilmory Biomass Project OBC (FPB,REV) 956 0 0 0 0 956
Net Zero 0 366 0 0 0 366
Non-NPDO Schools PV Panel Installations 400 0 0 0 0 400
NPDO Schools Solar PV Panel Installations 761 0 0 0 0 761
Oil to Gas Heating Conversions (FPB) 182 0 0 0 0 182
Strategic Change Total 17,806 1,479 550 0 0 19,835
Overall Total 17,806 2,600 2,522 382 0 23,310

Page 83

CAPITAL PLAN 2024-25 APPENDIX 7
ICT
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26      
£000s
2026-27     
£000s
2027-28       
£000s
Total
£000s
Asset Sustainability ICT Block Allocation - ICT 0 132 0 688 0 820
PC Replacement 0 561 669 0 0 1,230
Server Sustainability 0 488 400 0 0 888
Telecomms Network 0 88 152 0 0 240
Asset Sustainability Total 0 1,269 1,221 688 0 3,178
Service Development ICT Applications Projects 2,851 342 0 0 0 3,193
Service Development Total 2,851 342 0 0 0 3,193
Overall Total 2,851 1,611 1,221 688 0 6,371

Page 84

CAPITAL PLAN 2024-25 APPENDIX 7
Roads and Infrastructure Services
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26   
£000s
2026-27    
£000s
2027-28    
£000s
Total
£000s
Asset Sustainability RIS Block Allocation 0 0 4,168 3,823 0 7,991
Bridge Strengthening 0 141 1,243 0 0 1,384
Bute Sea Wall Repairs 0 633 0 0 0 633
Claonaig Landslip 0 1,142 28 0 0 1,170
Coastal Change Adaptation 0 67 237 0 0 304
Coastal Protection 0 196 0 0 0 196
Environmental Projects 0 721 0 0 0 721
EV Quick Chargers 0 52 0 0 0 52
Flood Prevention 0 1,041 156 0 0 1,197
Footway Improvements 0 219 0 0 0 219
Gartbreck - Capping 0 194 0 0 0 194
Glengorm - Capping 0 0 0 0 0 0
Glengorm - Cell and Transfer Station (PB) 0 -1 0 0 0 -1
Helensburgh CHORD - Signage etc 0 10 0 0 0 10
Helensburgh Flood Mitigation 0 0 427 0 0 427
Investment in Active Travel 0 200 0 0 0 200
Local Bridge Maintenance Fund 0 230 4,760 0 0 4,990
Plant and Machinery 0 0 0 0 0 0
Play Park Renewal 0 547 391 0 0 938
POPs Waste 0 86 0 0 0 86
Public Convenience Upgrades 0 118 109 0 0 227
RIS - Roads Plant and Equipment - CFCR 0 0 0 0 0 0
Roads Reconstruction 0 8,043 0 0 0 8,043
Roads Reconstruction - Helensburgh CHORD 0 47 0 0 0 47
Roads Reconstruction - Oban CHORD 0 3 0 0 0 3
Tobermory Car Park 0 96 0 0 0 96
Asset Sustainability Total 0 14,579 11,519 3,823 0 29,921
Service Development RIS Campbeltown Old Quay 1,381 0 0 0 0 1,381
Cuan Ferry - Hitrans 0 0 0 0 0 0
Depot Rationalisation 0 0 0 0 0 0
Fleet Management 4,502 258 0 0 0 4,760
Fleet Management - Prudential Borrowing 2,674 2,152 0 0 0 4,826
Jackson's Quarry Refurbishment 285 0 0 0 0 285
Lismore Ferry Replacement 637 35 0 0 0 672
Lochgilphead Depot Rationalisation 154 15 0 0 0 169
Oban Bus Congestion - Bus Partnership Fund 50 0 0 0 0 50
Oban Depot Development 2,224 -35 0 0 0 2,189
October Weather Incident 0 4,348 0 0 0 4,348
Preliminary design for  Regional Transport projects (tif) 205 16 0 0 0 221
Public Transport Operation Vehicles 0 233 0 0 0 233
Witchburn Road Demolition 158 0 0 0 0 158
Service Development Total 12,270 7,022 0 0 0 19,292
Strategic Change RIS Campbeltown Flood Scheme 13,748 1,780 10 387 0 15,925
Harbour Investment Programme Non PB 0 43 0 0 0 43
Harbour Investment Programme PB 9,295 24,050 33,250 24,697 0 91,292
Street Lighting LED Replacement 3,279 621 0 0 0 3,900
Strategic Change Total 26,322 26,494 33,260 25,084 0 111,160
Overall Total 38,592 48,095 44,779 28,907 0 160,373

Page 85

CAPITAL PLAN 2024-25 APPENDIX 7
Development and Economic Growth
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26    
£000s
2026-27     
£000s
2027-28     
£000s
Total
£000s
Service Development DEG Ardrishaig North Active Travel 831 49 0 0 0 880
Cycleways - H&L (FSPT) 2,905 497 0 0 0 3,402
Dunoon Cycle Bothy 483 80 0 0 0 563
Dunoon STEM Hub 131 2,427 0 0 0 2,558
Gibraltar Street Public Realm Improvements 153 97 0 0 0 250
Glenmorag Car Park PC 0 4 0 0 0 4
Helensburgh Public Realm - Arts Strategy Fund 3 25 25 0 0 53
Hermitage Park 3,362 26 0 0 0 3,388
Nature Restoration Fund 0 835 234 0 0 1,069
Rural Growth Deal 239 268 0 0 0 507
Safe Streets, Walking and Cycling (CWSS) 3,143 619 395 0 0 4,157
SPT - bus infrastructure 1,405 25 0 0 0 1,430
West Coast UAV Innovation Logistics and Training Hub 0 0 0 0 0 0
Service Development Total 16,650 5,286 654 0 0 22,590
Strategic Change DEG 01 TIF - Lorn/Kirk Road 2,169 1 0 0 0 2,170
05 TIF - North Pier Extension 214 0 0 0 0 214
09 TIF - Oban Airport Business Park 505 85 0 0 0 590
TIF - Halfway House Roundabout 66 287 287 0 0 640
Strategic Change Total 2,954 373 287 0 0 3,614
Overall Total 19,604 5,659 941 0 0 26,204

Page 86

CAPITAL PLAN 2024-25 APPENDIX 7
Health & Social Care Partnership
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26   
£000s
2026-27    
£000s
2027-28    
£000s
Total
£000s
Asset Sustainability HSCP Ardfenaig 0 12 0 0 0 12
Capital Property Works 0 55 0 0 0 55
Digitalising telecare 0 0 0 0 0 0
Eadar Glinn 0 34 0 0 0 34
East King Street Childrens Home 0 0 0 0 0 0
Glencruitten Hostel 0 301 0 0 0 301
Gortonvogie 0 0 0 0 0 0
Greenwood/Woodlands 0 1 0 0 0 1
HSCP - 102 East King Street "Jean's Bothy" - Rewire - 23-240 4 0 0 0 4
Kintyre Care Home 0 150 650 0 0 800
Rothesay Community Education Centre 0 0 0 0 0 0
Shellach View 0 2 0 0 0 2
Struan Lodge Boiler 0 700 0 0 0 700
Thomson Home Rothesay 0 270 370 0 0 640
Tigh An Rudha HFE 0 2,178 35 0 0 2,213
Tobermory Top Flat 0 0 0 0 0 0
Asset Sustainability Total 0 3,722 1,055 0 0 4,777
Service Development HSCP Dunclutha Childrens Home 1,246 54 0 0 0 1,300
Service Development Total 1,246 54 0 0 0 1,300
Overall Total 1,246 3,776 1,055 0 0 6,077

Page 87

CAPITAL PLAN 2024-25 APPENDIX 7
Live Argyll
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26    
£000s
2026-27   
£000s
2027-28 
£000s
Total
£000s
Asset Sustainability Live Argyll Aqualibrium 0 63 104 0 0 167
Capital Property Works 0 24 0 382 0 406
Corran Halls Gaelic Centre 0 19 0 86 0 105
Dunoon Community Education Centre - CFCR 0 0 0 0 0 0
Gym Equipment - CFCR 0 0 0 0 0 0
Kintyre Community Education Centre 0 6 0 0 0 6
Lochgilphead Community Ed Centre 0 411 0 0 0 411
Lochgilphead Library Relocation 0 0 0 0 0 0
Queen's Hall - Partition Wall 0 0 0 0 0 0
Riverside Leisure Centre - Spa Pool Upgrade 0 0 0 0 0 0
Rothesay Swimming Pool 0 24 65 0 0 89
The Moat Centre 0 393 0 0 0 393
The Moat Centre - Gym Store 0 0 0 0 0 0
Asset Sustainability Total 0 1,104 169 468 0 1,741
Service Development Live Argyll Riverside Leisure Centre Refurbishment 1,246 0 0 0 0 1,246
Service Development Total 1,246 0 0 0 0 1,246
Strategic Change Live Argyll Carbon Management 29 21 0 0 0 50
Strategic Change Total 29 21 0 0 0 50
Overall Total 1,275 1,125 169 468 0 3,037

Page 88

CAPITAL PLAN 2024-25 APPENDIX 7
Major Projects
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26     
£000s
2026-27          
£000s
2027-28     
£000s
Total
£000s
Strategic Change CHORD CHORD - Dunoon 12,499 23 0 0 0 12,522
CHORD - Helensburgh -Public Realm Imprv 6,532 25 0 0 0 6,557
CHORD - Oban 7,326 500 79 0 0 7,905
CHORD - Rothesay 21,046 2,611 0 0 0 23,657
Helensburgh Waterfront Development 24,111 281 0 0 0 24,392
HWD - FFE 316 34 0 0 0 350
Kilmory Business Park Phase 2AA 60 1,035 34 0 0 1,129
OBC for Dunoon Pier 2,844 0 0 0 0 2,844
Strategic Change Total 74,734 4,509 113 0 0 79,356
Overall Total 74,734 4,509 113 0 0 79,356

Page 89

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES     15 AUGUST 2024
TREASURY MANAGEMENT MONITORING REPORT – 30 JUNE 2024
1.0.  EXECUTIVE SUMMARY
1.1. This report sets out the Council’s treasury management position for the period 1 April
2024 to 30 June 2024 and includes information on:
 Overall borrowing position
 Borrowing activity
 Investment activity
 Economic background
 Interest rate forecast
 Prudential Indicators
1.2. Estimated borrowing is below the Capital Financing Requirement for the period to 30 June
2024, at this stage in the financial year capital expenditure is below target. 
1.3. The net movement in external borrowing in the period 1 April 2024 to 30 June 2024 was
£5.7m.
1.4. The levels of investments were £59.638 at 30 June 2024. The rate of return achieved was
5.276% compared to the target SONIA rate which was 5.200%.
1.5. The Council has significant cash balances which are invested in accordance with its
Annual Treasury Management Strategy on the basis of security first, liquidity second and
then return.

Page 90

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES     15 AUGUST 2024
TREASURY MANAGEMENT MONITORING REPORT – 30 JUNE 2024
2.0. INTRODUCTION
2.1. This report sets out the Council’s treasury management position for the period 1 April
2024 to 30 June 2024 and includes information on:
 Overall borrowing position
 Borrowing activity
 Investment activity
 Economic background
 Interest rate forecast
 Prudential Indicators
3.0. DETAIL
Overall Borrowing Position
3.1. The table below details the estimated capital financing requirement (CFR) and compares
this with the estimated level of external debt at 31 March 2024. The CFR represents the
underlying need for the Council to borrow to fund its fixed assets and accumulated capital
expenditure.
3.2. Borrowing is below the Capital Financing Requirement for the period to 30 June 2024.
The Council has delayed taking out any new long term borrowing, as rates are
expected to drop towards the end of 2024 plus the Council has significant cash
balances which reduces the need to borrow in the short term.
3.3. The Council’s Treasury Management Strategy states that any decision to borrow in
advance will be within forward approved Capital Financing Requirement estimates.
3.4. The Council’s estimated net capital financing requirement at 30 June 2024 is
£254.701m. The table below shows how this has been financed. £113.642m is
funded by loans and there are substantial internal balances of £200.697m of which
£59.638m are currently invested, as detailed in section 3.7, leaving a net internal
Forecast Forecast Forecast
2024/25 2025/26 2026/27
£000 £000 £000
CFR at 1 April 332,394 360,485 382,575
Net Capital Expenditure 40,283 35,016 24,270
Less Loans Fund Principal Repayments -6,254 -6,691 -6,962
Less: NPDO Repayment -5,938 -6,235 -6,844
Estimated CFR 31 March 360,485 382,575 393,039
Less Funded by NPDO -105,784 -105,846 -100,611
Estimated Net CFR 31 March 254,701 276,729 292,428
Estimated External Borrowing at 31 March
190,835 209,152 227,472
Gap 63,866 67,577 64,956

Page 91

balance of £141.059m. 
3.5. During the period from 1 April 2024 to 30 June 2024, £5.8m of loans were repaid. 
The analysis of the movement in borrowing is shown in the table below: 
3.6. The table below summarises the movement in the level and rate of temporary
borrowing at the start and end of the period. 
Position at
31/03/24
Position at
30/06/24
£000 £000
Loans 119 114
Net Internal Balances 67 141
Total CFR 187 255
Actual
£m
(6)
0
Net Movement in External Borrowing (6)
External Loans Repaid 1st April 2024 to 30th June 2024
Borrowing undertaken 1st April 2024 to 30th June 2024
£000 % Rate
Temp borrowing at 31st March 2024 5,251 4.70%
Temp borrowing at 30th June 2024 328 4.75%

Page 92

Investment Activity
3.7.     The average rate of return achieved in the Council’s investments to 30 June 2024 was
5.276% compared to the SONIA (Sterling Overnight Index Average) rate for the same period of
5.200%. At 30 June 2024 the Council had £59.638m of short term investments at an
average rate of 5.276%. The table below details the counterparties that the investments
were placed with, the maturity date, the interest rate and the credit rating applicable for
each counterparty. 
3.8. All investments and deposits are in accordance with the Council’s approved list of
counterparties and within the limits and parameters defined in the Treasury Management
Practices. The counterparty list is constructed based on assessments by leading credit
reference agencies adjusted for additional market information available in respect of
counterparties. 
3.9. The Council has significant cash balances which are invested in accordance with its
Annual Treasury Management Strategy. 
Counterparty Maturity Amount £000 Interest
Rate
Rating  S&P
Clydesdale Bank Instant
Access
338 5.15% Short Term A-2, Long
Term A-
London Borough of Croydon 10/10/2024 5,000 4.10% AA
First Abu Dhabi Bank 09/08/2024 5,000 6.16% Short Term A-1+,
Long Term AA-
ANZ 25/07/2024 5,000 5.32% Short Term A-1+,
Long Term AA-
Goldman Sachs 25/10/2024 5,000 5.34% Short Term A-1, Long
Term A+
Al Rayan 07/11/2024 5,000 5.35% Short Term P-1, Long
Term A2 (Moody's)
Al Rayan 08/11/2024 5,000 5.35% Short Term P-1, Long
Term A2 (Moody's)
DBS 15/08/2024 5,000 5.28% Short Term A-1+,
Long Term AA-
ANZ 05/09/2024 5,000 5.24% Short Term A-1+,
Long Term AA-
DBS 18/09/2024 5,000 5.31% Short Term A-1+,
Long Term AA-
Money Market Fund - BNP Paribas Call 13,300 5.26% AAA
MMF - Aviva Call 1,000 0.00% AAA
Total 59,638

Page 93

Economic and Interest Rate Forecasts
3.10. The latest economic background is shown in Appendix 1 with the interest rate forecast in
Appendix 2.
Prudential Indicators
3.11. The prudential indicators for 2024-25 are attached in Appendix 3.
4.0. CONCLUSION
4.1 In the period from 1 April 2024 to 30 June 2024, the Council’s borrowing decreased by £5.8m,
and it is currently below the Capital Financing Requirement. There are substantial internal
balances, of which £59.638m is currently invested. The average rate of investment returns
during the period was 5.276%.
5.0. IMPLICATIONS
5.1. Policy  None 
5.2. Financial Complies with Annual Treasury Strategy
5.3. Legal  None
5.4. HR None
5.5. Fairer Duty Scotland: 
5.5.1  Equalities – protected characteristics  None
5.5.2  Socio-economic Duty None
5.5.3  Islands  None
5.6. Climate Change  None
5.7. Risk  None
5.8. Customer Service  None
5.9 The Rights of the Child (UNCRC) None.
Kirsty Flanagan
Executive Director/Section 95 Officer
6 August 2024
Policy Lead for Finance and Commercial Services - Councillor Ross Moreland
Appendix 1 – Economic Background
Appendix 2 – Interest Rate Forecast
Appendix 3 – Prudential Indicators
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 94

Appendix 1 – Economics Update
 The first quarter of 2024/25 saw:
- GDP growth flatlining in April following positive Q4 2023/24 growth figures of 0.7% q/q.
- A stalling in the downward trend in wage growth, with the headline 3myy rate staying at 5.9%
in April.
- CPI inflation falling from 2.3% in April to 2.0% in May.
- Core CPI inflation decreasing from 3.9% in April to 3.5% in May.
- The Bank of England holding rates at 5.25% in May and June.
- 10-year gilt yields climbing to 4.35% in April, before closing out at 4.32% in May.
 The news that the economy grew by 0.7% q/q in Q4 2023/24 confirmed that it moved out of its very
mild technical recession that prevailed at the back end of 2023. However, data released for April
and May so far shows a slight stalling in the recovery, with GDP data for April coming out at 0.0%
m/m, as inclement weather weighed on activity.  Moreover, the fall in the composite Purchasing
Manager Index output balance from 53.0 in May to 51.7 in June confirms tepid growth.
 On a more positive note, the 2.9% m/m increase in retail sales volumes in May more than reversed
the 1.8% m/m drop in April as rainfall returned to seasonal norms. The strength was broad-based
across the retail sector, including online, (+5.9% m/m) suggesting an underlying strengthening in
sales beyond weather effects. With inflation falling back to target, Bank Rate likely to be reduced
soon and with consumer confidence improving, retail sales may well continue to strengthen.
 Stronger consumer spending, as low inflation allows households’ real incomes to strengthen and
the drag from higher interest costs fades, suggests that real consumption will strengthen
substantially over the next two years. However, investment will only make a modest contribution to
GDP growth. With the industrial sector still 12% smaller than in 2019, excess capacity will continue
to cap the need for industrial firms to invest. But improving business sentiment should raise
investment by services’ firms. Further, a fall in mortgage rates should trigger a recovery in residential
investment. Overall, strong consumer spending is likely to be the backbone of GDP growth, along
with government consumption.  Our colleagues at Capital Economics forecast that following GDP
growth of 1.0% in 2024, activity will continue to surprise to the upside with GDP growth of 1.5% for
both 2025 and 2026 (consensus forecasts are 1.2% and 1.4% respectively).
 Nonetheless, the on-going stickiness of wage growth in April will be a lingering concern for the Bank
of England. The 3myy rate of average earnings growth stayed at 5.9% in April (consensus 5.7%),
whilst the more timely 3m annualised rate rebounded from 5.9% to 9.3%. This stickiness partly
reflected April’s 9.8% increase in the minimum wage. This leaves the Bank of England’s forecast
for a fall back in regular private sector pay growth from 5.8% in April to 5.1% in June looking a
challenge.
 Despite the stickiness of wage growth in April, sharp falls in employment and a move up in
unemployment suggests that wage growth will soon be back on a downward path. The 139,000 fall
in employment in the three months to April was accompanied by a rise in the unemployment rate
from 4.3% to 4.4%. This was the fourth increase in a row and took it to its highest level since
September 2021. The rise would have been larger were it not for the 132,000 increase in inactivity
in the three months to April as the UK’s disappointing labour market participation performance since
the pandemic continued. The vacancies data also paint a picture of a slowly cooling labour market.
The number of job vacancies fell from an upwardly revised 908,000 to 904,000, leaving vacancies
31% below the peak in May 2022, but 11% above the pre-pandemic level.
 The fall in CPI inflation in May back to the Bank’s 2% target for the first time since July 2021 will
have come as welcome news to the Bank. Furthermore, with CPI inflation of 3.3% in the US and
2.6% in the Euro-zone in May, the UK appears to have won the race to get CPI inflation back to

Page 95

2.0%. A further easing in food inflation from 2.8% in April to 1.6% in May played a part in the fall in
overall CPI inflation and with food producer price inflation at just 0.2% in May, food price inflation
will probably soon fall to zero. 
 The core rate also fell back from 3.9% to 3.5%. Within that, core goods CPI inflation slipped below
zero for the first time since October 2016.  As expected, clothing/footwear, recreation/culture and
restaurants/hotels categories inflation declined, reflecting base effects from big increases last May.
While services inflation fell from 5.9% to 5.7%, this decline was smaller than the Bank of England
expected (forecast 5.3%). And the timelier three-month annualised rate of services prices has
rebounded from 8.5% to 9.2%. This suggests that the persistence in domestic inflation that the Bank
is worried about is fading more slowly than it thought. Even so, there is scope for inflation to fall
further. 
 There was little chance that the Bank would cut rates at its June meeting, given upside surprises
on services CPI inflation and wage growth. But several developments implied a rate cut is getting
closer (August?). First, two members of the MPC, Ramsden and Dhingra voted again to reduce
rates immediately to 5.00%. Second, despite the recent run of stronger inflation and activity, the
minutes noted “indicators of inflation persistence had continued to moderate” and that a range of
indicators suggest pay growth had continued to ease. And there was new wording that members of
the MPC will consider all the information available and how this affects the assessment that the
risks from inflation persistence are receding “as part of the August forecast round”. 
 Throughout the quarter there was a degree of volatility in the gilt market and, by way of example,
the 10-year gilt yield rose from 4.05% on 2nd April to finish at 4.15% on 28th June but it has exceeded
4.30% on several occasions.  Overall, investors judged that interest rates will need to remain high
for longer to keep inflation around the 2.0% target. 
 Meanwhile, the FTSE 100 broke through the 8,000 mark in April for the first time since its brief three-
day flutter in February last year and reached a record closing high of 8,446 on 15th May.  However,
by the end of the quarter, despite AI-fuelled rises in the US S&P500, it finished rather tamely and
had fallen back to 8,164.  Arguably, significant interest rate cuts and an on-going UK economic
recovery will be required for a further resurgence to take hold. 
PWLB maturity Certainty Rates 1st April to 30th June 2024 
 Gilt yields and PWLB rates remained relatively stable between 1st April and 30th June.  Having said
that, the spread between the low and high points during the quarter was between 0.3% and 0.45%
across the curve. 
 The 50-year PWLB Certainty Rate target for new long-term borrowing (the low point of our forecast
on a two-year timeline) started 2024/25 at 4.00% and increased to 4.20% on 28th May.  As can be
seen, with rates remaining elevated across the whole of the curve, it is advised to not borrow long-
term unless the Authority wants certainty of rate and judges the cost to be affordable.

Page 96

MPC meetings 9th May and 20th June 2024
 On 9th May, the Bank of England’s Monetary Policy Committee (MPC) voted 7-2 to keep Bank Rate
at 5.25%.  This outcome was repeated on 20th June.  
 Nonetheless, with UK CPI inflation now back at 2% and set to fall further over the coming months,
Ramsden and Dhingra – who voted again to reduce rates immediately to 5.00% in June – may
shortly be joined by some members in the no-change camp, for whom the June decision was “finely
balanced” as the upside news on services price inflation was more likely to be a reflection of one-
off effects and volatile components rather than factors that would push up “medium-term inflation”.

Page 97

Appendix 2 – Interest Rate Forecast 
The Council has appointed Link Group as its treasury advisors and part of their service is to assist the
Council to formulate a view on interest rates. The PWLB rate forecasts below are based on the Certainty
Rate (the standard rate minus 20 bps) which has been accessible to most authorities since 1st
November 2012.  For Housing Revenue Account authorities, the lower Housing Revenue Account
(HRA) PWLB rate has also been available since 15 June 2023 (standard rate minus 60 bps) but is
available for HRA borrowing only. 
The latest forecast, updated on 28th May, sets out a view that both short and long-dated interest rates
will start to fall once it is evident that the Bank of England has been successful in squeezing excess
inflation out of the economy, despite a backdrop of a stubbornly robust economy and a tight labour
market. 
Moreover, whatever the shape of domestic data, recent gilt market movements have been heavily
influenced by the sentiment pertaining to US monetary policy.  Again, inflation and labour data has
proven sticky and the market’s expectation for rate cuts has gradually reduced throughout the course
of the year, so that possibly rates may not be cut more than once, or possibly twice, before the end of
2024.  In any event, even if the Bank of England starts to cut rates first, it may mean that the medium
and longer parts of the curve take longer to fully reflect any such action until the US yield curve shifts
lower too.  Given the potential inflationary upside risk to US treasuries if Trump wins the presidential
election in November (increased tariffs on imports from China for example), therein lies a further risk
to yields remaining elevated for longer. 
Closer to home, the General Election is not expected to have a significant impact on UK monetary
policy.  There is minimal leeway for further tax cuts or added spending without negatively impacting
market sentiment.  It may even be the case that the Bank of England will steer clear of an August rate
cut – should that be supported by the inflation data – in favour of weighing up fiscal policy implications
and market sentiment in the aftermath of the election.   
Accordingly, Link’s central case is still for a rate cut before the end of September, but we are not
committed to whether it will be in August or September.  Thereafter, the path and speed of rate cuts is
similar to that which we previously forecast, with Bank Rate eventually falling to a low of 3% by H2
2026. 
However, given the increased uncertainty surrounding Link’s central gilt market forecasts, and the
significant issuance that will be on-going from several of the major central banks, it has marginally
increased its PWLB forecasts by c20 to 30 basis points across the whole curve since the previous
quarter.   
In summary, regarding PWLB rates, movement in the short-end of the curve is expected to reflect Link’s
Bank Rate expectations to a large degree, whilst medium to longer-dated PWLB rates will remain
influenced not only by the outlook for inflation, domestically and globally, but also by the market’s
appetite for significant gilt issuance (£200bn+ for each of the next few years).  As noted at the Link
March Strategic Issues webinars, there is upside risk to that part of our forecast despite the Debt
Management Office skewing its issuance to the shorter part of the curve.

Page 98

 Money market yield forecasts are based on expected average earnings by local authorities for 3 to
12 months.
 The Link forecast for average earnings are averages i.e., rates offered by individual banks may
differ significantly from these averages, reflecting their different needs for borrowing short-term cash
at any one point in time.

Page 99

Appendix 3 – Prudential Indicators 
PRUDENTIAL INDICATOR 2024-25 2024-25 2025-26 2026-27
(1).  EXTRACT FROM BUDGET
Forecast
Outturn
Original
Estimate
Forecast
Outturn
Forecast
Outturn
Capital Expenditure £'000 £'000 £'000 £'000
Non - HRA 40,283 43,320 35,016 24,270
TOTAL 40,283 43,320 35,016 24,270
Ratio of financing costs to net revenue stream
Non - HRA 4.54% 4.36% 4.44% 4.49%
Net borrowing requirement
brought forward 1 April * 332,394 320,025 360,485 382,575
carried forward 31 March * 360,485 351,041 382,575 393,039
in year borrowing requirement 28,091 31,016 22,090 10,464
In year Capital Financing Requirement
Non - HRA 28,091 31,016 22,090 10,464
TOTAL 28,091 31,016 22,090 10,464
Capital Financing Requirement as at 31 March    
Non - HRA 360,485 351,041 382,575 393,039
TOTAL 360,485 351,041 382,575 393,039

Page 100

PRUDENTIAL INDICATOR 2024-25 2025-26 2026-27
(2).  TREASURY MANAGEMENT PRUDENTIAL INDICATORS £'M £'M £'M
Authorised limit for external debt -    
borrowing 251 280 288
other long term liabilities 109 109 104
TOTAL 360 389 392
Operational boundary for external debt -     
borrowing 246 275 283
other long term liabilities 106 106 101
TOTAL 352 381 384
Upper limit for fixed interest rate exposure
Principal re fixed rate borrowing 190% 190% 190%
Upper limit for variable rate exposure
Principal re variable rate borrowing 60% 60% 60%
Upper limit for total principal sums invested for over 364 days £20m £20m £20m
(per maturity date)
Maturity structure of new fixed rate borrowing during 2024/25 upper limit lower limit
under 12 months 30% 0%
12 months and within 24 months 30% 0%
24 months and within 5 years 30% 0%
5 years and within 10 years 40% 0%
10 years and above 100% 0%

Page 101

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 15 AUGUST 2024
RESERVES AND BALANCES – UPDATE AS AT 30 JUNE 2024 
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to advise Members of the overall level of
reserves held by the Council as well as providing detail on the monitoring of the
earmarked balances held within the General Fund. 
1.2 The Council has a total of £689.113m unusable reserves that are not backed with
resources. They are required purely for accounting purposes. 
1.3 At 31 March 2024 the Council had a total of £121.701m of usable reserves. Of this:
• £2.763m relates to the Repairs and Renewals Fund
• £3.197m relates to Capital Funds
• £115.741m was held in the General Fund, with £107.443m of this balance
earmarked for specific purposes.
1.4 At the budget setting meeting on 22 February 2024, as part of the revenue budget,
Council agreed to the transfer Strathclyde Pension Fund contribution savings of
£6.875m relating to Council staff and £3.053m relating to Social Work staff to
reserves.  It was also agreed that £1.875m of revenue surplus within 2024-25 be
transferred to the Capital Plan.  As the commitments for these include expenditure
within 2024-25 year, these have been immediately recognised within the
earmarked reserves balances to allow them to be spent accordingly.  This results
in a total in-year earmarked balance of £119.246m. 
1.5 Of the earmarked balance of £119.246m: 
• £60.078m is invested or committed for major initiatives/capital projects 
• £28.359m is still to be drawn down in 2024-25
• £30.809m is planned to be spent in future years 
1.6 The Council’s General Fund contingency level is set at 2% of net expenditure for
2024-25 which equates to £6.039m.  At the beginning of the financial year there
was £2.259m of unallocated General Fund Balance (over and above contingency). 
After taking into consideration the current forecast outturn for 2024-25 and
assuming Members agree to the proposed actions regarding the weather event, is
estimated to have a £1.816m surplus over contingency.

Page 102

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 15 AUGUST 2024
RESERVES AND BALANCES - UPDATE AS AT 30 JUNE 2024 
2. INTRODUCTION 
2.1 This report outlines current balances on the Council’s reserves, both usable and
unusable. It also provides detail on the monitoring of the earmarked balances
within the General Fund.   
3. DETAIL 
3.1 Types of Reserves 
3.1.1 Usable Reserves - Councils have powers to establish certain resource backed
reserves which can be used to fund expenditure.  The powers of councils to
establish reserves are laid out in Schedule 3 of the Local Government
(Scotland) Act 1975.  These allow councils to establish a Renewal and Repairs
Fund, Insurance Fund and Capital Fund. Councils can also establish a Useable
Capital Receipts Reserve.  The Council must also maintain a General Fund and
can earmark balances for specific purposes within the General Fund. 
3.1.2 Unusable Reserves – Councils are also required to establish certain reserves
that are not backed by resources. They are required purely for accounting
purposes and do not represent resources available for councils to utilise. The
Pensions Reserve, Revaluation Reserve, Capital Adjustment Account, Financial
Instruments Adjustment Account and Accumulated Absences Account are
examples of unusable reserves. 
3.2 Reserve Balances at 31 March 2024 
3.2.1 The balances on each type of reserve at 31 March 2024 are set out in the two
tables below, per the Unaudited Accounts for 2023-24. 
Unusable Reserves £000
Revaluation Reserve 180,661
Capital Adjustment Account 249,093
Financial Instruments Adjustment Account (1,585)
Pensions Reserve 269,216
Accumulated Absences Account (8,272)
Total Unusable Reserves 689,113 
Usable Reserves £000
Repairs and Renewals Fund 2,763
Capital Fund and Usable Capital Receipts Reserve 3,197                                                                                                                
General Fund  115,741
Total Usable Reserves  121,701
Total Reserves  810,814

Page 103

3.2.2 The Revaluation Reserve represents the unrealised gains in the valuation of
fixed assets. The Capital Adjustment Account represents the difference
between depreciation based on proper accounting practice and statutory
charges for financing capital expenditure. The Financial Instruments Adjustment
Account represents the difference between gains and losses on borrowing and
statutory capital financing charges. The Pensions Reserve represents the
difference between pension costs based on proper accounting practice and
payments made for pension costs. The Accumulated Absences Account
represents the costed difference between holiday pay entitlement and actual
holidays taken at 31 March. 
3.2.3 The Repairs and Renewals Fund was established to support funding of renewal
and replacement of school equipment.  Schools can only draw on the Repairs
and Renewals Fund to the extent they have previously paid into the Fund and
contributions must be contained within schools devolved budgets. 
3.2.4 The Capital Fund was established to receive all capital receipts generated by
the Council and can be used to support the capital plan or meet the principal
repayments on loan charges. The Council decides as part of the budget
process each year how it wishes to draw funding from the Capital Fund. 
3.2.5 The Usable Capital Receipts Reserve relates to the accumulated unspent
capital receipts from sale of council houses prior to transfer of the housing
stock. The reserve forms part of the Council’s Strategic Housing Fund and can
only be used for investment in social housing. The reserve will be used in
accordance with the approach to investing in housing agreed by the Council in
August 2012. 
3.3 General Fund 
3.3.1 The General Fund balance at 31 March 2024 can be analysed as follows: 
Balance
31/03/24
£000
Balance on General Fund as at 31 March 2023 86,356
Increase to General Fund balance at end of 2023-24 29,385
Earmarked Balances* (107,443)
Contingency allowance at 2% of net expenditure (6,039)
Unallocated balance as at 31 March 2024 2,259 
* Note that the earmarked balance of £107.443m includes £35.658m of new
earmarked reserves relating to the Service Concessions gain as detailed at
paragraph 3.6. 
3.3.2 The General Fund includes balances that the Council has agreed to earmark for
specific purposes. Some of these earmarked balances will be spent during the
current financial year and some of them will be held over and spent in later
years. The table below shows the balance at 31 March 2024, the new amounts
earmarked from the Strathclyde Pension Fund savings (see section 3.7), the

Page 104

amount from the revenue budget for Capital agreed at Council in February
2024, the amounts that are currently invested or set aside for major initiatives,
the amount already spent and planned to be spent in the current year, the
amount to be spent in future years and any sums no longer required to be
earmarked. Appendix 1 provides further details on the breakdown of unspent
budget earmarkings.  Officers have reviewed and updated the spending
profiles. 
3.4 Unallocated General Fund Balance 
3.4.1  The Council’s General Fund contingency is set at 2% of net expenditure for
2024-25 and amounts to £6.039m.  At the beginning of the financial year there
was £2.259m of unallocated General Fund Balance (over and above
contingency).   After taking into consideration the current forecast outturn for
2024-25 and assuming Members agree to the proposed actions regarding the
weather event, is estimated to have a £1.816m surplus over contingency. 
Earmarking
Category
Balance
31/03/2024 -
per year
end
published
report
New
Earmarkings
in year
Invested or
committed
for major
initiatives
/capital
projects
Drawn-
down to
2024-25
Budget as
at 30/06/24
Still to be
drawn-
down in
2024-25
Planned
Spend
Future
Years
Released to
General
Fund
£000 £000 £000 £000 £000 £000 £000
Strategic Housing
Fund 8,765 8,765
Investment in
Affordable
Housing
3,024 3,024
Capital Projects 37,958 37,958
Lochgilphead and
Tarbert
Regeneration
1,050 1,050
Support for Rural
Growth Deal 541 541
Piers and
Harbours
Investment Fund
4,125 4,125
Scottish
Government
Initiatives
2,779 1,185 1,594
CHORD 409 409
DMR Schools 739 739
Energy Efficiency
Fund 238 238
Unspent Grant 15,786 1,699 9,132 4,955
Unspent Third
Party Contribution 454 220 234
Previous Council
Decision - Other 4,140 1,470 1,232 1,438
Redundancy
Provision 2,963 150 2,813
Connect for
Success Fund 681 406 275
Fleet - Timing
Delay 484 484
Hermitage Park 56 10 46
Priorities
Investment Fund 4,742 4,742
Unspent Budget 18,509 11,803 1,446 14,563 14,303
Totals 107,443 11,803 60,078 0 28,359 30,809 0

Page 105

3.4.2 The revenue budget position as at 30 June 2024 was estimated to be a
£4.658m overspend, of which £0.648m relates to Social Work. 
3.4.3 Social Work, as a part of the Integrated Joint Board (IJB), are able to hold any
surplus within reserves therefore it is expected that any underspend that
materialises would be transferred to the IJB reserves and the General Fund of
the Council would not be impacted.    
3.4.4 The table below summarises the position of the unallocated General Fund
balance taking into consideration the points noted above. 
Heading Detail £000
Unallocated General Fund
as at 31 March 2024
This is the balance that is
unallocated over and above the 2%
contingency, which amounts to
£6.039m
2,259
Current Forecast Outturn
for 2024-25 as at 30 June
2024
Per paragraph 3.4.2.  (4,658)
Social Work outturn
adjustment
Per paragraph 3.4.3 - Social Work
would expect to transfer any surplus
to internal IJB reserves
648
Sub-total – potential
unallocated balance as
at 31 March 2025
*If no separate action is taken
regarding the weather event
overspend, the unallocated
general fund balance would fall
below 0
(1,751)
Options to pay for weather
related incident
Members have been presented with
options to cover the pressures
resulting from the weather incident
3,567
Estimated Unallocated
balance as at 31 March
2025 
1,816 
* If Members do not agree to the options outlined in the separate report and the
unallocated general fund balance falls below the amount available and moves
into contingency then a recovery plan would be required to bring the contingency
level back up to the agreed amount. 
3.5 Loans Fund Review 
3.5.1 At the Council meeting on 27 February 2020, it was agreed that the one-off re-
profiling gain of £20.561m generated by the loans fund review should be used
partly to create a provision for the increasing principal repayments over the next
10 years (£7.649m) with the remainder of the gain (£12.912m) used to fund
known liabilities/cost pressures. The £12.912m has now been transferred to
Earmarked Reserves in full.

Page 106

3.6 Service Concessions 
3.6.1 At the Council meeting on 23 February 2023 it was agreed that the Council adopt
the financial flexibility introduced by the Scottish Government relating to Service
Concession contracts. This resulted in a one-off retrospective gain of £36.038m. 
The commitments associated with this were further refined at the Council meeting
on 22 February 2024 and it was agreed that £0.380m be transferred into the
general fund balance, leaving a one-off gain of £35.658m which now being held
in earmarked reserves.  Appendix 2 provides information on these commitments.  
3.7 Strathclyde Pension Fund Reserves 
3.7.1 The Strathclyde Pension Fund reported an exceptionally strong set of results with
a surplus of almost £9bn which has allowed a reduction in the employer
contribution rate.  Argyll and Bute Council is seeing a reduction in employer
contributions from 19.3% to 6.5% over 2024-25 and 2025-26, before reverting to
a sustainable long-term rate in the third year of 17.5%.  For the Council, the one-
off saving in the first two years associated with a reduction to 6.5% is £6.875m
per year.  On 22 February 2024, Council agreed to allocate the cumulative gain
in the first two years of £13.750m as follows: 
Description 2024-25
£000
2025-26
£000
Total
£000
Realised saving 6,875 6,875 13,750
£2m in 24-25 to balance revenue budget (2,000)  (2,000)
£3.750m allocation to capital plan (3,750)  (3,750)
£2m to be directed towards
transformation projects (1,125) (875) (2,000)
£2m in 25-26 to balance revenue budget  (2,000) (2,000)
£2m in 26-27 to balance revenue budget  (2,000) (2,000)
£2m allocation to capital plan  (2,000) (2,000) 
0 0 0 
3.7.2 The £6.875m from the 2024-25 revenue budget saving has been logged within
the earmarkings with the commitments noted above to allow expenditure to be
made against them. 
3.7.3 For Social Work, the SPF saving is £3.053m per annum and is being ring fenced
within the Council reserves for utilisation by the HSCP in the future.  This amount
is also being logged with the earmarkings in 2024-25 to allow expenditure to be
made if required.   
4. CONCLUSION 
4.1 The report outlines the overall reserves and balances for the Council covering
the purpose and level of each reserve.  It also provides detail as to expenditure
against earmarked balances held within the General Fund.   
4.2 As at 30 June 2024 the estimated unallocated General Fund, after taking into
consideration the current forecast outturn for 2024-25 and assuming Members
agree to the proposed actions regarding the weather event, is estimated to
have a £1.816m surplus over contingency.

Page 107

5. IMPLICATIONS 
5.1 Policy - Earmarked funds and funds set aside for delivery of
Single Outcome Agreement are available to support
Council Policy.
5.2 Financial -  Outlines the balances held with the Council’s usable
and unusable reserves.     
5.3 Legal -  None.
5.4 HR -  None.
5.5 Fairer Scotland Duty- None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty -  None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  A contingency of £6.039m (equivalent to 2% of net
expenditure) has been set aside as part of the
general fund.  This has been subject to a risk
assessment. 
5.8 Customer Service -  None. 
5.9 The Rights of the Child
(UNCRC) - 
None. 
Kirsty Flanagan
Executive Director/Section 95 Officer 
6 August 2024 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
APPENDICES
Appendix 1 – Earmarked Reserves breakdown of unspent budget
Appendix 2 – Earmarked Reserves breakdown of Service Concessions earmarkings 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 108

APPENDIX 1
Earmarked Reserves - Unspent Budget (Including Service Concessions)
As at 30 June 2024
Ref Department Service Description Opening
Balance
Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount Planned
to be Spent from
2026/27 onwards
001 Chief Executive's Unit Community
Planning
Service Concessions - Priorities Investment
Fund (Area Plans)
200,000 200,000 100,000 100,000 As agreed by Policy and Resources Committee on 23 October 23 - drawdown of
£200,000 from the Priorities Investment Fund to fund two temporary posts and
associated costs to produce meaningful area plans
100,000 100,000 0
002 Chief Executive's Unit Community
Planning
Communities and Partnership Team 8,855 8,855 8,855 0 The funds have originated from externally sourced income due to an employee
being seconded to the Scottish Community Development Centre (SCDC).  The funds
will be used to support the team in relation to meeting its priorities of Building Back
Better (Communities), Climate Change and the review of the Argyll and Bute
Outcome Improvement Plan.
8,855 0 0
003 Executive Director (Douglas
Hendry)
Across Services /
Commercial
Services
Information Management (Estates Survey
Work)
12,697 12,697 12,697 0 To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of
change as outlined in the BV Review.  The planned initiatives include: Estates Survey
work £122k, Digitalisation of Title Deeds £92k, document management and
workflow system for Planning, Building Standards and Environmental Health £77k
and a balance of funding to explore information management solutions in a strategic
and coherent way £209k. This balance relates to Estates Survey Work. Having a
procured supplier to provide floor plans at short notice is required to be able to
react quickly to requests. If this isn't available Estates would need to go through the
procurement process again which would delay any projects by several months.
There isn’t a detailed plan to use this resource it is more about being able to react
quickly and not delay projects.
12,697 0 0
004 Executive Director (Douglas
Hendry)
Across Services /
Education
Digital Projects (Supply Staff Booking
System)
15,200 15,200 9,900 5,300 To deliver a number of Digital Service Transformation Projects with a commitment
of £0.035m towards a Supply Staff Booking system.  Phase 1 of the project is nearing
completion.
9,900 5,300 0
005 Executive Director (Douglas
Hendry)
Commercial
Services
Rothesay Pavilion Charity 750,000 750,000 0 750,000 Agreed at Council meeting February 2020, £750k additional revenue support subject
to conditions which seek to minimise the risk to the Council as far as is reasonably
practicable including requirement for adequate business and financial management
and regular reporting by RPC.  This funding is to support Rothesay Pavilion Charity in
the first 2 years of the building being operational.
0 750,000 0
006 Executive Director (Douglas
Hendry)
Commercial
Services
Rothesay Pavilion Essential repairs 306,400 306,400 0 306,400 Essential repairs to deal with potential health and safety risks and to avoid further
deterioration.  Budget provision was approved by the Policy and Resources
Committee on 21 August 2014.  
0 306,400 0
007 Executive Director (Douglas
Hendry)
Commercial
Services
Commercial Investment Manager post and
specialist consultant technical resource
(previously Asset Management Fund)
104,000 104,000 104,000 0 The Asset Management Fund has been redirected to Capital going forward but the
interest for 2023-24 is to be used towards a Commercial Investment Manager Post. 
This is because funding of £200k from the Asset Management Fund was agreed at
ELT in June 22 for the post, along with specialist consultancy and technical resources 
that will be required to support early projects.  Note, the  £104k represents the
balance of the £200k commitment.
104,000 0 0
008 Executive Director (Douglas
Hendry)
Commercial
Services
Estates - NDR Revaluation Appeals 59,938 59,938 29,969 29,969 The Council agreed to make provision to meet the cost of appealing Non Domestic
Rates (NDR) revaluations which were imposed from April 2017. The remaining funds
were carried forward to the 2023/24 revaluation cycle however a recent change in
position by the Scottish Government may restrict the appeals which can be made.
This is still under discussion and Gerald Eve Surveyors have been appointed as
specialist advisers on this matter, who are progressing 2023-26 appeals. In the event
that appeals are limited there may be an opportunity to utilise Gerald Eve for more
general valuation advice subject to Procurement approval.
29,969 29,969 0
009 Executive Director (Douglas
Hendry)
Commercial
Services
Mid Argyll Community Pool 30,000 30,000 30,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.030m to Mid Argyll Community Pool in response to an external
funding request.
30,000 0 0
010 Executive Director (Douglas
Hendry)
Commercial
Services
MacTaggart Leisure Islay 30,000 30,000 30,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.030m to MacTaggart Leisure, Islay in response to an external
funding request.
30,000 0 0
011 Executive Director (Douglas
Hendry)
Commercial
Services
Site Investigation Works 21,013 21,013 21,013 0 For Site Investigation works in relation to Tweeddale Street Car Park and Oban
Airport Business Park, exploring commercial opportunities to develop the sites and
raise revenue income for Argyll and Bute Council. HUB North were instructed to
procure contractors to undertake the site investigations these are now complete.
The remainder of the budget is intended to be utilised for other site investigation
and pre-development works to further develop commercial opportunities across the
council area.
21,013 0 0

Page 109

Ref Department Service Description Opening
Balance
Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount Planned
to be Spent from
2026/27 onwards
012 Executive Director (Douglas
Hendry)
Education ASN Review 1,255,000 1,255,000 565,000 690,000 To fund capital costs of ASN adaptations as part of ASN Review to increase equity of
provision across Argyll and Bute.  This will be subject to a business case as part of
the wider ASN review. Update: Business case now approved and working group set
up with quotes for works being carried out Jan 2024.
565,000 690,000 0
013 Executive Director (Douglas
Hendry)
Education Reduced Teacher Staffing Costs - Strike
Action
800,000 800,000 800,000 0 To fund one off savings in 2024-25 from the underspend in staffing from strike
action.
800,000 0 0
014 Executive Director (Douglas
Hendry)
Education (2023 Digital Projects) School WiFi
Upgrades
166,924 166,924 166,924 0 To extend WiFi coverage within school settings through the purchase of additional
hardware such as access points, switches and other networking hardware. This will
result in more flexible learning spaces and support the growing number of devices
within schools. Project now underway and if budget not fully utilised it is hoped that
the balance could be diverted to assist with Capital costs of Education Network
Paper.
166,924 0 0
015 Executive Director (Douglas
Hendry)
Education Education Transformation Fund 144,637 144,637 0 144,637 At the Council meeting on 27 February 2020, it was agreed to input £400k into
Education Digital Learning.  The additional funds have been spent in 20/21, 21/22
and 22/23 as part of the ongoing transformation work in the Education service,
focussing on digital and virtual learning technology and the development of learning
clusters. 
0 144,637 0
016 Executive Director (Douglas
Hendry)
Education MCR Pathways Pilot 80,000 80,000 80,000 0 Funding to support implementation of MCR Pathways mentoring programme within
three secondary schools for 2023-24 academic year. Funding will allow the
employment of a dedicated Co-ordinator within each setting to develop and
implement the programme which is designed to benefit care experienced and other
disadvantaged pupils through targeted mentoring support.
80,000 0 0
017 Executive Director (Douglas
Hendry)
Education Gaelic Specific Grant 30,000 30,000 30,000 0 Gaellic Specific Grant £30k - This earmarking refers to the Council contribution
towards the Gaelic grant for 22-23 and will fund the costs of Gaelic Language
Principal Teacher in 24-25 academic year.
30,000 0 0
018 Executive Director (Douglas
Hendry)
Education (2023 Digital Projects) Cashless Catering 30,000 30,000 10,000 20,000 To support the ongoing implementation of the new cashless catering system during
the testing and roll out phase.
10,000 0 20,000
019 Executive Director (Douglas
Hendry)
Education Skype for Business for Education / Digital
Projects (Skype for Business)
10,000 10,000 0 10,000 To fund the initial capital costs for the implementation of Skype for Business for
Education.  This will bring the Education service in line with other council
departments and will improve staff collaboration and modernise school telephony
to deliver the  service more efficiently and cost effectively.
0 10,000 0
020 Executive Director (Douglas
Hendry)
Education Education Learning Estate Condition
Surveys
1,815 1,815 0 1,815 To fund the delivery of School Core Facts (SCF) compliant Condition Surveys for
prioritised School Buildings.
0 0 1,815
021 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Education Purchasing Officers 210,000 210,000 168,000 42,000 The earmarked funds will be used to fund an education purchasing team within the
Procurement Service for two years.  The team will embed good procurement
practice, train headteachers on current procurement process requirements, develop
spend plans that evidence best value.
168,000 42,000 0
022 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Information Management (Digitalisation of
Title Deeds)
92,000 92,000 20,500 71,500 To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of
change as outlined in the BV Review.  The planned initiatives include: Estates Survey
work £122k, Digitalisation of Title Deeds £92k (delay on spending due to COVID-19),
document management and workflow system for Planning, Building Standards and
Environmental Health £77k and a balance of funding to explore information
management solutions in a strategic and coherent way £209k
20,500 51,000 20,500
023 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
(2023 Digital Projects) Replacement of
Council Chambers Online Meeting
Equipment
50,071 50,071 5,353 44,718 Current online meeting system  is less than resilient and has failed on a number of
occasions, leading to issues at strategic committees. A condition assessment by the
incumbent maintenance contractor has highlighted that the current equipment is
now at end of life and unsupportable due to the  obsolescence of the system.
Discussions with ICT have taken place to identify a simpler more robust solution to
be procured.
NUWAY system and maintenance, system installed, ongoing maintenance contract
to 2030
5,353 44,718 0
024 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Councillor IT Equipment 44,557 44,557 22,000 22,557 There is currently no budget for the provision and renewal of IT equipment for
members. The earmarking identifies a resource to utilise spend for that purpose to
ensure that members have continued support in maintaining and replacing vital IT
equipment.
22,000 22,557 0
025 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Digital Projects: Hybrid Council meetings 43,302 43,302 12,000 31,302 The funding will be used to maintain the ICT equipment used to support the
provision of on-line and hybrid Council meetings.  Will be used to fund Public-I
licence over 3 years - for livestreaming Council meetings.
12,000 0 31,302
026 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Debt Counselling & Welfare Rights 21,452 21,452 6,000 15,452 To meet the cost of a Debt Counselling and Welfare Rights Management System. 6,000 0 15,452

Page 110

Ref Department Service Description Opening
Balance
Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount Planned
to be Spent from
2026/27 onwards
027 Executive Director (Douglas
Hendry)
Non
Departmental /
Legal and
Regulatory
Services
Community Resilience Fund 71,999 71,999 5,000 66,999 Fund established in 2012/13 to be spent over more than one year. Fund reduced at
the Council meeting on 11 February 2016.  Used to cover the costs of emergency
phone lines and a contract with Aggreko for generators if required in an Emergency
Planning/Civil contingencies incident.  These costs amount to approximately £5k per
year.
5,000 0 66,999
028 Executive Director (Kirsty Flanagan) Across Services /
Customer Support
Services
Digital Projects (Increase in Schools
Bandwidth)
63,455 63,455 0 63,455 To complete one of a number of Digital Service Transformation projects with a
commitment of £0.064m to increase Schools Bandwidth. 
0 0 63,455
029 Executive Director (Kirsty Flanagan) Across Services /
Customer Support
Services
Digital Projects (Replacement Learning
Management System)
11,470 11,470 11,470 0 To deliver a number of Digital Service Transformation Projects with an original
commitment of £0.030m towards a replacement Learning Management System
£0.030m.  This money will be used to pay for consultancy for an interface between
itrent and totara. Profiled for 24/25 based on decision to do a phased
implementation of itrent.
11,470 0 0
030 Executive Director (Kirsty Flanagan) Across Services /
Development and
Economic Growth
Information Management (Document
Management and Workflow for Planning,
Building Standards and Environmental
Health)
21,177 21,177 21,177 0 Hoping to implement the replacement for IDOX in March 2024 but there have been
severe issues/delays with the new programme
21,177 0 0
031 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) iTrent Project 320,555 320,555 320,555 0 Combination of parallel running of the new iTrent system alongside the legacy
systems for up to 18 months whilst iTrent is implemented and additional staffing
resource to implement iTrent in late June 2024 and support staff for the first 3
months of operation through summer 2024. Total includes £73k from Financial
services for funding additional staffing resource to implement the payroll
components of the iTrent HR and Payroll System by the end of June 2024 and
support staff for the first 3 months of operation during summer 2024.
320,555 0 0
032 Executive Director (Kirsty Flanagan) Customer Support
Services
Growing our Own and Modern Apprentices 109,150 109,150 44,000 65,150 Funding earmarked to support trainee development and modern apprenticeship
opportunities based on priority workforce risk areas.  A Trainee Regulatory Services
post has been proposed by the manager who was unable to secure a suitable
candidate for the original advert. The spend would be spread over 24/25 and 25/26
once a suitable candidate is in post
44,000 25,150 40,000
033 Executive Director (Kirsty Flanagan) Customer Support
Services
Security Operations Centre Subscription 71,188 71,188 0 71,188 There is a requirement to pay for a 3-year subscription at £60,000 per annum with a
cost pressure being added to the ICT revenue budget to cover the costs from 2026-
27 onwards. 
0 71,188 0
034 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Resilient Website
Project
60,000 60,000 60,000 0 Cybersecurity action to move to a cloud based website platform that would improve
resilience and enable service continuity in the event of a cyber attack.  Procurement
in progress for resilient website solution and Scotgov Cloud Services Project
providing input. Contract Award expected by end 2023. Procurement in progress for
resilient website solution.   Contract Award expected FQ1 2024-5 and full £60k
spend in that year. Payment milestones in CARR will be 25% on Contract Award, 25%
on Cloud Site Provisioning, 25% on Site migration and 25% on full go live cutover.
60,000 0 0
035 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Digital Project
Officer
34,121 34,121 34,121 0 Employ a temporary Digital Project Officer as part of OD changes - additional
member of staff required to action changes, unable to recruit so existing staff
increasing hours.
34,121 0 0
036 Executive Director (Kirsty Flanagan) Customer Support
Services
Implementation of Gaelic Language Plan 30,000 30,000 10,000 20,000 Agreed at Council Meeting February 2021.  Provision of funding for delivery and
implementation of the council’s Gaelic Language Plan in recognition of the
contribution that Gaelic makes to economic growth and to the tourism sector, and
to enable delivery of key activities within the plan which currently receive no
revenue funding.  In discussion with Bord na Gaidhlig about a 3-year Gaelic Plan
funding programme as opposed to individual grant applications for specific projects.
This earmarking would be used to provide match funding for that 3 year programme
of projects.
10,000 20,000 0
037 Executive Director (Kirsty Flanagan) Customer Support
Services
Business Development Training 27,025 27,025 10,000 17,025 £27k budget from original Business Development Training earmarking remaining at
31/03/24.  This budget is funding ongoing leadership development, coaching, action
learning sets and commissioned training including Priority Management.
10,000 17,025 0
038 Executive Director (Kirsty Flanagan) Customer Support
Services
Learning and Development 19,436 19,436 10,000 9,436 In order to maximise the opportunities and efficiencies of digital learning, this
funding will be used to support the extension of digital learning in order to deliver
the Digital Learning Strategy, which was approved in FQ4 20/21. This money is to
support the additional digital learning capacity required to build online elements of
AB365 and other key digital learning as we increase our digital learning offering
linked to the digital skills survey and review of corporate training. Delays in
recruitment meant this has been reprofiled for spend in 24/25
10,000 9,436 0
039 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Digital Engagement
Services Developer
15,677 15,677 15,677 0 To fund 50% of a new temporary LGE10 post.  The post is a Digital Engagement
Services Developer that will be provide capacity to deliver service efficiencies
through the use of the  new CREATE/RPA software.  The other 50% of the post can
be funded from a current vacancy. 
15,677 0 0

Page 111

Ref Department Service Description Opening
Balance
Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount Planned
to be Spent from
2026/27 onwards
040 Executive Director (Kirsty Flanagan) Customer Support
Services
Establishing HR Service Centre 13,824 13,824 13,824 0 To facilitate the implementation of technical efficiency improvements and new
processes.  This money will be used to support phase two of the itrent project. 
Spend reprofiled for 2024/25 following delays in itrent project.
13,824 0 0
041 Executive Director (Kirsty Flanagan) Development &
Economic Growth
Planning Income 60,000 60,000 60,000 0 To fund additional resources to support and develop the Council's planning service. 
Whilst recruitment issues within Argyll and Bute were largely been resolved during
2022/23, the requirement for the operation of the DM Service with reduced staffing
levels over an extended period of time, coupled with the increasing demand for
development post-Covid, and uncertainty caused by the introduction of National
Planning Framework 4 has given rise to a substantial backlog of case work and has
had a significant adverse impact on processing times for planning applications.
Plans to utilise this on additional staff costs in 24-25 in order to reduce the backlog.
60,000 0 0
042 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Oban TIF (Tax Incremental Financing) 214,158 214,158 214,158 0 Will be used to fund the TIF Programme office for a further 3 years as well as the
programme office for Rural Growth Deal beyond the funding that was agreed at
Council for this in February 2021.
214,158 0 0
043 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Service Concessions - Priorities Investment
Fund (Project Officer for Housing
Emergency)
200,000 200,000 70,000 130,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£200,000 from the Priorities Investment Fund to fund a Project Officer to assist in
accelerating the work of the Housing Emergency.
70,000 130,000 0
044 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Strategic Events & Festivals 41,260 41,260 41,260 0 At the Council meeting on 25 February 21, a decision was taken to agree £90k
funding for Events and Festivals for 22/23, in order that the application process can
commence during 21/22 and that this agreed figure be augmented by any
underspend remaining from the 20/21 financial year.  At 24 February 22, decision
made to agree £90k for 23/24, in order that the application process can commence
during 22/23 and that this agreed figure be augmented by any underspend
remaining from the 21/22 financial year.  Applications have been received and
payments will be made in 23-24. Final balance (£41,260) to be spent in 24/25
41,260 0 0
045 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Screen Machine 28,000 28,000 28,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.028m to Screen Machine in response to an external funding
request.
28,000 0 0
046 Executive Director (Kirsty Flanagan) Development and
Economic Growth
International Eight Metre Association
World Cup
10,000 10,000 10,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.010m to the International Eight Metre World Cup in response
to an external funding request.
10,000 0 0
047 Executive Director (Kirsty Flanagan) Financial Services Revenue and Benefits BPR  - extra staff to
implement savings targets
86,955 86,955 86,955 0 On 23 February 2023, the Council agreed to the implementation of savings option
FIS2324-002 in relation to the Revenue and Benefits - Income Generation and
Business Process Review.   This included an extra 4 FTE of staff.  Delays in
recruitment have caused slippage in the allocated budget for these posts. 
86,955 0 0
048 Executive Director (Kirsty Flanagan) Financial Services Scotland Loves Local 57,453 57,453 57,453 0 As agreed by Council 22 February 24, a £57,453 underspend from the Scotland Loves
Local scheme to be allocated to support measures to help with the costs of living by
funding member organisations of the Community Food Forum, ALI Energy, Argyll
and Bute Citizens Advice Bureau and Bute Advice Centre, with detailed proposals to
be agreed by the Executive Director with responsibility for Finance, in consultation
with the Leader, Depute Leader and Leader of the Largest Opposition Group. Details
of the agreed spend are to be reported to elected members.
57,453 0 0
049 Executive Director (Kirsty Flanagan) Financial Services Financial Systems 33,748 33,748 30,748 3,000 The council is required to implement the IFRS16 Leases accounting standard  from
the 1st April 2024.
30,748 0 3,000
050 Executive Director (Kirsty Flanagan) Financial Services Accounting and Budgeting Team Resilience 47,883 47,883 8,000 39,883 Training and examination fees for 6 staff who are currently undertaking their
professional CIPFA/ACCA training.  In addition funding the further training of 1 of our
auditors and providing finance business partner training to a group of our existing
professional staff.
8,000 8,000 31,883
051 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Waste Variation Monies 1,241,752 1,241,752 569,752 672,000 Waste Variation Monies - £1.242m balance at 31/03/24: This will be used to
fund/part-fund various waste infrastructure projects that will support the council’s
compliance with the 2026 ban on the Landfill of Biodegradable Municipal Waste.
£570K in 2024-25 consisting of :- Island restoration/capping, Helensburgh transfer
station and recycling improve. fund (island sites) design costs, technology trial on
blue bin recycling participation, consultancy costs relating to additional monitoring
data for SEPA and waste PPP site conversion.
£672K in 2025-26  consisting of:- Island restoration/capping, Helensburgh transfer
station design costs during construction, consultancy costs relating to additional
monitoring data for SEPA and waste PPP site conversion.
569,752 672,000 0

Page 112

Ref Department Service Description Opening
Balance
Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount Planned
to be Spent from
2026/27 onwards
052 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Service Concessions - Priorities Investment
Fund (Strategic Development Framework)
450,000 450,000 225,000 225,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£450,000 to procure consultancy support to assist in driving forward the Strategic
Development Frameworks.
225,000 225,000 0
053 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
3G pitches / Tarbert Sports Pitches 287,835 287,835 83,883 203,952 In November 2018, the Council agreed to a maintenance funding package to be
progressed for a number of 3G pitches including Tarbert. This funding will provide
an estimated 6.5 years’ worth of ongoing maintenance up to 2025-26. There is the
potential to extend the continued upkeep of the pitches until 2026-27 given the
earmarking available will not be fully utilised by the end of 2025-26.  However, there
will be potential redundancy costs for 2 employees that will need to be covered
from the remaining balance. Paper on proposed extension to be prepared.
83,883 203,952 0
054 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Green Transport Initiatives 140,000 140,000 140,000 0 At the Council meeting on 27 February 2020, it was agreed to input £400k in Green
transport, investment in footway and cycle path maintenance supporting the
healthy wellbeing and green agenda.  Spend has been delayed due to COVID and
this will be taken forward in 23/24. £260k Footways Reconstruction programme now
spent and will be drawn down against capital programme during 23/24. £140k
Ardrishaig North Project spent in 22/23 and drawn down in 24/25 (capital
expenditure).
140,000 0 0
055 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Climate Change 40,942 40,942 40,942 0 At the Council meeting on 27 February 2020, it was agreed to input £500k budget to
mitigate the impacts of weather related damage and climate change with specific
emphasis on gully cleaning and drainage improvements.  Spend has been delayed
due to COVID and the intention is to spend the funds on 2 Gully Motors plus staff
over next 2 years. Vehicles have been received and budget will be drawn down to
cover their cost. The remaining budget will be used towards running the vehicles.
40,942 0 0
056 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Amenity Services introduction of
management information system
28,099 28,099 0 28,099 Delay with introduction of amenity time recording system due to increased costs. 
Discussions ongoing to find alternative cheaper solution.  The software/system
being introduced by HR/Payroll during 2023-24 offers a time-recording facility. 
Although not included in the current HR/Payroll spec, once the new system is up and
running, the proposal would be to investigate the time-recording system to see if
viable for amenity time recording purposes.
0 0 28,099
057 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Services
(2023 Contract Inflation Adjustments)
Waste PPP
223,261 223,261 223,261 0 Contract Inflation adjustments - £0.223m balance at 31/03/24.  Adjustment to
inflation included in the budget based on updated RPIX figures at February 2023. 
Based on actuals in 23-24, only £32k of this was required leaving a balance of £223k.
223,261 0 0
058 Executive Director (Kirsty Flanagan) Roads and
Infrastructure
Services
Weather Incident costs not covered by
Bellwin claim.
198,000 198,000 198,000 0 £839k was set aside at budget meeting in February 2024 as part of the unallocated
general fund balance workings to cover the weather incident costs not covered by
the Bellwin Claim.  As £641k was utilised during 23-24, the balance of £0.198m is
being earmarked for costs expected in 24-25.
198,000 0 0
059 Non Departmental Non
Departmental
Service Concessions - Replace previous
loans fund principal repayment holiday
5,400,000 5,400,000 5,400,000 0 As agreed at Council meeting 23 February 2023 - The one-off retrospective benefit
will be used to replace exercising the principal repayment holiday that was
previously agreed by Council.
5,400,000 0 0
060 Non Departmental Non
Departmental
Pay Inflation Contingency 1,700,000 1,700,000 1,700,000 0 Negotiations for the 2024/25 pay award are ongoing but initial discussions suggest it
will be beyond the 3% increase currently built into the budget outlook. £1.7m
equates to approximately a 1% pay rise therefore providing a contingency at this
level is prudent
1,700,000 0 0
061 Non Departmental Non
Departmental
Underwriting development of Rothesay
Pavilion
1,000,000 1,000,000 1,000,000 0 Funding to meet additional costs identified as necessary for the refurbishment of
Rothesay Pavilion (£1m).
1,000,000 0 0
062 Non Departmental Non
Departmental
Oban TIF (Tax Incremental Financing -
Excess NDR)
875,651 875,651 0 875,651 This is the surplus NDR after paying all Loans Charges in respect of TIF infrastructure
projects.  This fund will be used in the future as TIF projects are delivered.  
Discussions in place on future ff the next TIF project (Oban Airport) which will utilise
this reserve.  If the project does not go ahead, we will need to return NDR to
Scottish Government
0 875,651 0
063 Non Departmental Non
Departmental
Treasury Gain 294,000 294,000 294,000 0 To fund one off operational saving 202425 003 as agreed by Council when setting
2024/25 budget in February 2024.
294,000 0 0
064 Non Departmental Non
Departmental
Information Management (Balance of
Funding)
200,469 200,469 200,469 0 To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of
change as outlined in the BV Review.  This was the balance of funding to explore
information management solutions in a strategic and coherent way £209k. 
Committed for MS 365 project - D Logan/I Jackson. Paper went to DMT in Dec.
200,469 0 0

Page 113

Ref Department Service Description Opening
Balance
Budget
Drawdown
New
earmarkings
in year
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount Planned
to be Spent from
2026/27 onwards
065 Non Departmental Non
Departmental
Engagement with Hub North re provision
of services for older adults and vulnerable
people across Argyll and Bute
100,000 100,000 70,000 30,000 At the Council budget meeting February 23, an allocation of £0.1m from the
Unallocated General Fund balance for the Health and Social Care Partnership to
engage, in partnership with the Council, with Hub North to develop a strategic
business case in relation to the provision of services for older adults and other
vulnerable people across Argyll and Bute.  It is intended that this will be spent on an
on-going business case and options appraisal work with Hub and that a sizable
proportion will be spent during 24/25
70,000 30,000 0
066 Non Departmental Non
Departmental
Spend to Save Route Optimisation
Software
82,775 82,775 82,775 0 One-off re-profiling gain as a result of the loans fund review to fund known
liabilities/cost pressures as agreed at budget setting meeting in February 2020 - 
Spend to save route optimisation (£0.100m) which will be spent over  2023/24 and
2024/25.
82,775 0 0
067 Non Departmental Non
Departmental
CHARTS 80,000 80,000 80,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to
£0.075m one-off investment in CHARTS in response to an external funding request
will be spent in 24-25. There remains £0.005m from a COVID earmarking for CHARTS
as well.
80,000 0 0
068 Non Departmental Non
Departmental
Council Strathclyde Pension Fund Saving 24-
25 (£2m to balance 24-25 budget)
2,000,000 2,000,000 2,000,000 0 This is part of the revenue budget for 24-25 and is the saving on pension budgets
resulting from the drop in employers pension rate.  The total of £6.875m is split as
follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget
meeting 22 February 24 and the balance of £1.125m going towards what will be
total of £2m over the two years pot to be directed to transformation and projects
that will save revenue in the future.
2,000,000 0
069 Non Departmental Non
Departmental
Council Strathclyde Pension Fund Saving 24-
25 (£3.75m allocation to capital plan)
3,750,000 3,750,000 0 3,750,000 This is part of the revenue budget for 24-25 and is the saving on pension budgets
resulting from the drop in employers pension rate.  The total of £6.875m is split as
follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget
meeting 22 February 24 and the balance of £1.125m going towards what will be
total of £2m over the two years pot to be directed to transformation and projects
that will save revenue in the future.
0 3,750,000
070 Non Departmental Non
Departmental
Council Strathclyde Pension Fund Saving 24-
25 (£2m to be directed to transformation
and projects that will save revenue in the
future)
1,125,000 1,125,000 0 1,125,000 This is part of the revenue budget for 24-25 and is the saving on pension budgets
resulting from the drop in employers pension rate.  The total of £6.875m is split as
follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget
meeting 22 February 24 and the balance of £1.125m going towards what will be
total of £2m over the two years pot to be directed to transformation and projects
that will save revenue in the future.
1,125,000
071 Non Departmental / Social Work Non
Departmental
Social Work Strathclyde Pension Fund
Saving 24-25
3,053,000 3,053,000 0 3,053,000 This is part of the revenue budget for 24-25 and is the saving on Social Work pension
budgets resulting from the drop in employers pension rate - to be held in Council
reserves for utilisation by the HSCP in future. 
3,053,000
072 Non Departmental Non
Departmental
Capital Plan 1,875,000 1,875,000 0 1,875,000 At the budget meeting on 22 February 2024, Council agreed to transfer £1.875m
from the revenue budget over to the capital plan.
1,875,000
18,509,179 0 11,803,000 30,312,179 15,702,691 14,609,488 15,702,691 4,483,983 10,125,505

Page 114

APPENDIX 2
Earmarked Reserves - Service Concessions
As at 30 June 2024
Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
001 Chief Executive's Unit Community
Planning
Service Concessions - Priorities Investment
Fund (Area Plans)
200,000 200,000 100,000 100,000 As agreed by Policy and Resources Committee on 23 October 23 - drawdown of
£200,000 from the Priorities Investment Fund to fund two temporary posts and
associated costs to produce meaningful area plans
100,000 100,000 0
002 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Service Concessions - Priorities Investment
Fund (Project Officer for Housing
Emergency)
200,000 200,000 70,000 130,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£200,000 from the Priorities Investment Fund to fund a Project Officer to assist in
accelerating the work of the Housing Emergency.
70,000 130,000 0
003 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Service Concessions - Biodegradable
Municipal Waste (BMW) Ban
3,500,000 3,500,000 0 3,500,000 As agreed at Council meeting 23 February 2023 - Ensuring Argyll and Bute is able to
better address the challenges faced by a remote/rural/ island region in complying
with the forthcoming national BMW ban. 
0 3,500,000 0
004 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Service Concessions - Priorities Investment
Fund (Strategic Development Framework)
450,000 450,000 225,000 225,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£450,000 to procure consultancy support to assist in driving forward the Strategic
Development Frameworks.
225,000 225,000 0
005 Non Departmental Non Departmental Service Concessions - Learning Estate
Investment Strategy
8,000,000 8,000,000 0 8,000,000 As agreed at Council meeting 23 February 2023 - Signalling council’s commitment to
working in partnership to secure new schools for Argyll and Bute, through substantial
investment to support future-proofing of Argyll and Bute’s schools estate.
0 8,000,000 0
006 Non Departmental Non Departmental Service Concessions - Replace previous
loans fund principal repayment holiday
5,400,000 5,400,000 5,400,000 0 As agreed at Council meeting 23 February 2023 - The one-off retrospective benefit
will be used to replace exercising the principal repayment holiday that was previously
agreed by Council.
5,400,000 0 0
007 Non Departmental Non Departmental Service Concessions - Rothesay Pavilion 4,772,000 4,772,000 0 4,772,000 As agreed at Council meeting 23 February 2023 - Building on previous commitments
to securing a future for this building of international, national and local significance
with additional contribution to the overall funding target which requires collective
action; helping project to progress towards success with funding that supports
completion of certain work stages and securing wind/watertight status.
0 4,772,000 0
008 Non Departmental Non Departmental Service Concessions - Priorities Investment
Fund
4,742,000 4,742,000 0 4,742,000 As agreed at Council meeting 23 February 2023 - Safeguarding future investment in
Priorities for Argyll and Bute by making long-term use of service concession gain to
establish dedicated fund to lever in, secure and support key strategic investments in
this year and future years.
0 4,742,000 0
009 Non Departmental Non Departmental Service Concessions - Roads Investment to
Capital
3,546,000 3,546,000 0 3,546,000 As agreed at Council meeting 23 February 2023 - Augmenting overall allocation for
roads repair and maintenance programme with additional funds to bring up to £8m
total investment for 2024/25.
0 3,546,000 0
010 Non Departmental Non Departmental Service Concessions - Capital Projects
Inflation Pressures
2,000,000 2,000,000 0 2,000,000 As agreed at Council meeting 23 February 2023 -Boosting resilience of Capital
Programme and providing added support as required for key capital/infrastructure
projects - £2m.
Further allocation agreed Council meeting 22 February 24 - increase capital contract
earmarking to protect current capital projects in plan £0.297m
0 2,000,000 0
011 Non Departmental Non Departmental Service Concessions - Priorities Investment
Fund (Capital Programme)
1,028,000 1,028,000 0 1,028,000 As agreed by Council on 22 February 2024- transfer of £1,028,000 from the Priorities
Investment Fund to the Capital plan
1,028,000 0
012 Non Departmental Non Departmental Service Concessions - New refuse collection
vehicles
700,000 700,000 700,000 0 As agreed at Council meeting 23 February 2023 - Enhancing waste and recycling uplift
arrangements through placing orders for new refuse vehicles.
700,000 0 0
013 Non Departmental Non Departmental Service Concessions - Climate Change 640,000 640,000 0 640,000 As agreed at Council meeting 23 February 2023 - Continuing our track record of
investing in climate change with funding to further enhance school estate climate
change measures, with allocations for primary and secondary schools across the area
in Campbeltown, Dunoon, Helensburgh, Lochgilphead, Oban and Rothesay.
0 640,000 0
014 Non Departmental Non Departmental Service Concessions - New Jet Patcher
Vehicle
250,000 250,000 250,000 0 As agreed at Council meeting 23 February 2023 - Complementing multi-million pound
capital investment in roads repair and maintenance with new jet patcher order to
support delivery of programme.
250,000 0 0
015 Non Departmental Non Departmental Service Concessions - New Road Marking
Vehicle
230,000 230,000 0 230,000 As agreed at Council meeting 23 February 2023 - Completing suite of investments in
new fleet procurement, to support delivery of roads repair and maintenance
programme, with order for additional road marking vehicle.
0 230,000 0
35,658,000 0 35,658,000 6,745,000 28,913,000 6,745,000 28,913,000 0