Democracy Spraffa

Argyll and Bute Council British Sign Language Plan 2024 - 2030

Argyll and Bute Council · 10 October 2024
Back to Policy and Resources Committee — 10 October 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

ARGYLL AND BUTE COUNCIL   POLICY AND RESOURCES COMMITTEE
CUSTOMER SUPPORT SERVICES  10 OCTOBER 2024 
ARGYLL AND BUTE COUNCIL BRITISH SIGN LANGUAGE PLAN 2024-2030 
1.0 INTRODUCTION 
1.1 Argyll and Bute Council is required to create a new British Sign Language Plan.
This will replace the Joint British Sign Language Plan 2018-2024, which was
approved in 2018. 
1.2 This report sets out the steps which have been taken to develop the new plan
and presents the plan for approval. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Policy and Resources Committee approves the
Argyll and Bute Council British Sign Language Plan 2024-2030. 
3.0 DETAIL 
3.1 The Scottish Government published its second National British Sign Language
plan in November 2023. According to legislation, following its approval, listed
authorities, of which Argyll and Bute Council is one, were required to produce
local plans. 
3.2 Work on preparing the plan got underway in January 2024. To meet the
requirements of the legislation, two distinct strands of work were carried out.
One was to ascertain progress made with regard to the previous plan (Argyll and
Bute Council Joint British Sign Language Plan 2018-2024). The second strand
was to develop the new plan. These two strands have been combined to create
a single document (Appendix 1). 
3.3 Learning from the previous plan, we have attempted to keep the new one as
realistic as possible. We decided not to develop a multi-agency plan as was the
case previously, when the plan was produced jointly with Live Argyll and NHS
Highland. In practice, only two actions in the previous plan were delivered by
Live Argyll, and there is nothing deliverable by Live Argyll in the new plan. With

Page 2

regard to NHS Highland (and the HSCP), we have agreed to coordinate our
activities and reporting while keeping the plans separate. 
3.5 Discussions took place with officers from Live Argyll, NHS, HSCP, Education,
Employability, Governance and Law, and Community Justice during the
development of the draft plan. Actions have been agreed by the officers who will
be responsible for their delivery. 
3.6 In preparing the plan, we encountered a number of barriers, not least is the
identification of our Deaf community within Argyll and Bute, which appears to be
small and dispersed. Unlike other areas, we do not have a Deaf Club or other
organisation which can be used as a focus for consultation activity. 
3.7 The 2011 Census reported that there were 152 people aged 3 and over in the
area who used BSL at home (0.2% of the total). While the 2022 Census
indicates that there are 2,137 individuals aged 3 and over who can use British
Sign Language in the area (2.5%), the questions are not directly comparable
and the 2,137 figure is highly unlikely to reflect everyday use of the language. 
3.8 We are required by the legislation to consult about our plan with BSL users and
tactile BSL users. To meet this requirement, we carried out a short, online
consultation on the draft plan. The plan and consultation questions were made
available to respondents as a downloadable Word document and in a BSL
translation video uploaded to YouTube, with links to the video provided from the
consultation page set up on the council’s website. The consultation itself was
promoted through the council’s Keep in the Loop emails, social media, and the
consultation section of the council’s website. 
3.9 The consultation ran for six weeks from early May. We received two responses,
one from a BSL user, one not. The only comment made with regard to the
content of the plan was that we should provide funding to enable Education staff
to increase their proficiency in BSL, moving from BSL Level 1 to BSL Level 2.
However, as this is captured by action 12 in the plan: ‘Offer opportunities to
teachers to build on their BSL learning’, we do not propose the plan be
revised in light of this. 
3.10 Upon approval of the BSL plan, next steps will be to publish the final version of
the plan and to develop a more detailed implementation plan for the actions. We
will produce an interim report on the plan’s progress half-way through the plan’s
life, in 2027. We will also include the BSL plan as a standing agenda item at the
council’s Equality Forum meetings to enable progress to be monitored
throughout the lifetime of the plan. 
3.11 The Argyll and Bute British Sign Language Plan 2024-2030 and completed
Equality and Socio-Economic Impact Assessment are appended to this report
as appendices 1 and 2 respectively.

Page 3

4.0 CONCLUSION 
4.1 This report has set out the actions taken to develop Argyll and Bute Council’s
British Sign Language Plan 2024-2030. The plan is appended to the report for
approval. 
5.0 IMPLICATIONS 
5.1 Policy  None arising directly from this report. 
5.2 Financial  None arising directly from this report. 
5.3 Legal  The creation of the British Sign Language Plan is required to meet
legislation. 
5.4 HR   None arising directly from this report. 
5.5 Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics: We are required to produce a
BSL plan. This relates to the protected characteristic of disability. An
equalities and socio-economic impact assessment has been completed in
respect of the plan and the link is appended to this report. 
5.5.2   Socio-Economic Duty: The proposals in the BSL plan relate to a
specific community of interest: the Deaf community. An equalities and socio-
economic impact assessment has been completed in respect of the plan and
the link is appended to this report. 
5.5.3  Islands: no islands impacts arise from the proposed approach or plan. 
5.6 Climate Change None arising specifically from the proposals in this report. 
5.7 Risk    Failure to comply with legislation may put the council at legal and
reputational risk. 
5.8  Customer Service some actions in the plan may result in better customer
service for BSL users. 
5.9 The Rights of the Child (UNCRC): some actions in the plan relate to the
provision of Education services for children. 
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Policy Lead: Councillor Mark Irvine

Page 4

For further information contact: 
Chris Carr OD Project Officer
chris.carr@argyll-bute.gov.uk 
APPENDICES
Appendix 1:  Argyll and Bute Council British Sign Language Plan 2024-2030
Appendix 2: Equality and Socio-Economic Impact Assessment for Argyll and Bute
Council British Sign Language Plan 2024-2030