Appendix 1 
1
Argyll and Bute Council
Annual Business Plan 2023 – 2024
Update Report

Page 2

Appendix 1 
2
Council Priorities Action Plan 2023 - 2024
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
People and places, our core business as a council. 
Attaining and achieving at all stages; we will improve outcomes for our children and
young people. 
Improve educational attainment,
achievement and outcomes for
our young people within Argyll
and Bute to Scotland’s upper
quartile. 
Continue to work in
close partnership with
Developing the Young
Workforce (DYW) to
ensure young people
successfully develop
the skills for life and
work required to attain
sustained positive
destinations post-
school.  
Track young people’s
pathways within school
and in the period after
leaving school, to
ensure appropriate
support, guidance and
opportunities are in
place to gain and
sustain positive
destinations. 
95% of 16-19 year olds are in
Education, Training or
Employment
The Annual Participation Measure for
2022-23 was published as of the end of
August 2023 and we have exceeded our
target with 95.6% of 16-19 year olds in
Education, Training or Employment. The
2023-24 Annual Participation Measure will
be published at the end of August 2024.  
The February 2024 Scottish Government
Insight update shows that 95.3% of young
people in Argyll and Bute who left school in
2023 entered a positive destination.  
DYW and schools continue to increase the
number of school-employer partnerships,
enabling young people to undertake work
placements which match their interests and
aspirations, develop skills for life and work
and lead to formal accreditation. The
number of work placements undertaken
has increased each year since Covid-19
restrictions were lifted.  Full data on 2023-
24 work placements will be available in
June.

Page 3

Appendix 1 
3
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
All schools fulfil a robust calendar of 16+
meetings with DYW and Skills
Development Scotland (SDS) to identify
those most at risk of negative destinations,
and work with young people, families,
employers and other agencies to ensure
sustainable post-school destinations are
achieved.
Educational Attainment and
Wider Achievement –
Developing the use of all the
available data and intelligence
on each of our educational
establishments to focus on and
drive improvement, achieving
our stretch aims (goals to
improve opportunities and
outcomes for young people) as
agreed with the Scottish
Government.
Build staff capacity in
the interrogation and
use of data for
improvement.  
Deliver targeted and
universal literacy and
numeracy support for
establishments in order
to raise attainment with
specific focus on pupils
residing in Quintile 1.  
Support schools to
rigorously track and
monitor pupil progress
and plan measurable
interventions and
initiatives to raise
attainment for all whilst
closing the poverty
related attainment gap. 
Stretch aims are achieved:
Literacy 68.4%, Numeracy
75% School Leavers with 1 or
more pass at SCQF Level 5 
88.81%., School Leavers with
1 or more pass at SCQF Level
6 68.5%
A number of Career Long Professional
Learning (CLPL) sessions have been
delivered in order to support data literacy.
Through quality improvement visits, it is
evident that there is increasing confidence
amongst many senior leaders in terms of
rigorous systems for tracking, monitoring
and using data. 
Our Education Officer for Scottish
Attainment Challenge has been supporting
and challenging schools to ensure that
Pupil Equity Funding (PEF) is well planned
for using clear measures of success from
the outset. This has resulted in a significant
reduction in underspends at financial year
end. It has also ensured that schools are
robustly tracking the impact that PEF
interventions are having to close the
poverty related attainment gap. Our
Literacy Education Support Officer and
Numeracy Lead continue to support and
challenge targeted schools in order to raise
attainment of children who are
economically disadvantaged.

Page 4

Appendix 1 
4
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
In June 2023 (data published Dec 23) we
achieved or exceeded almost all of our
stretch aims. Of particular note is the
reduction of the gap between those
residing in Q1 and Q5 in literacy and
numeracy at P1/4/7 combined.
Developing a broader curriculum
offer to augment current
opportunities with a range of
wider achievement awards and
accreditations.  This will have a
positive impact on leaver
destinations through inclusive,
skills - based programmes in
each secondary school.
Support secondary
schools via UK Shared
Prosperity Funding to
ensure accredited wider
achievement
opportunities exist for
every pupil at each
stage of their
secondary education.  
Develop partnerships
with Community
Learning, UHI Argyll
and Third Sector
agencies to increase
wider achievement
opportunities for young
people at each stage of
their secondary
education. 
Young People in every
secondary school have the
opportunity to engage in 1
accredited wider achievement
programme at each stage of
their secondary education.
Development of this programme of Wider
Achievement is ongoing, with Community
Learning and Development increasing its
support in and across our secondary
schools. Through Community Learning
engagement, 362 young people have
engaged across 13 accredited courses,
while 449 young people have accessed
eight non-accredited courses.  
Secondary schools are successfully
sourcing UKSPF funding to ensure wider
achievement opportunities exist for every
pupil at each stage of their secondary
education.  
Personalised Flexible Learning Plans
(FLPs) are broadening the curriculum for
disengaged and vulnerable young people,
developing their skills for life and work, and
increasing the number of post-school
positive destinations.  36 FLPs are in place
across secondary schools.
Continuing to promote the
teaching and use of Gaelic as
set out in the council’s emerging
Gaelic Plan for 2023.
The Education Officer
and Principal Teacher
will support
establishments build
Achieve the number of schools
offering Gaelic as L2 and L3 to
60% (dependent on Scottish
Government).
The Principal Teacher has continued to
provide a high level of support for schools
through lesson modelling/live lessons,
CLPL for staff, resources and support

Page 5

Appendix 1 
5
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
staff capacity and help
to establish Gaelic as
an L2 or L3. 
Continue to signpost
schools to ESgoil
support and support
and materials from
other agencies such as
Education Scotland and
Storlann. 
Principal Teacher will
continue to deliver
online language
lessons with colleagues
from Highland and
North Ayrshire
Councils. 
visits. At present, we have 7 primary
schools that provide Gaelic medium
education, 17 primary schools that deliver
Gaelic as L2 and 4 secondary schools that
deliver Gaelic following the fluent path and
as L2 or L3.  We have 31 primary schools
providing Gaelic as L3.  Therefore, the
majority of our schools are delivering
Gaelic as either L1, L2 or L3 and we have
surpassed our L2/L3 target by
approximately 16%. We also have Gaelic
as L3 being supported by external partners
Feisgoil and e-sgoil. 5 primary schools
have had online Gaelic lessons from
Feisgoil this session and 1 primary school
from E-sgoil. 
Learning estate now and in the future; we will ensure our schools are effective,
sustainable learning environments. 
Progress a bid to the Scottish
Government to establish a new
campus on Mull. 
Await response on bid
to Scottish Government
Successful award from
Scottish Government.
Council agreed to commence the business
case, undertake engagement exercises,
commence site selection process and
establish governance arrangements with
updates to be brought back to members at
appropriate gateway points.

Page 6

Appendix 1 
6
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
Develop the next generation of
capital investment plan and
priorities for our school estate.
Service Asset
Management Plan
(SAMP) for Education
and delivery of
Programme by Feb
2024.   
All programmed work
completed by the specified
date and in line with the
allocated capital budget.
Service Asset Management Plan (SAMP)
for Education and delivery of Programme
by Feb 2025.   
Supporting children and young people with additional needs. 
Reducing the number of children
and young people who have to
travel out-with the area to
access services by enhancing
provision where gaps currently
exist.
Develop plans and
funding arrangements
for four Learning
Centres in areas as
identified in the ASN
review of 2021/22. 
Increase the number of
staff within educational
settings being CALM
trained. 
Increase the number of
children accessing enhanced
provision within Argyll and
Bute.
The ASN Project Board has developed a
timeline for the implementation of 4 new
learning centres.  Two will be operational
by August 2024, one by August 2025 and
the further island resource timeline will be
established in concurrence with the
decision to develop a new campus on Mull.
Working to improve and secure
equity of specialist provision
across Argyll and Bute by
addressing gaps where they
exist across the education
estate. 
Clarify funding and
develop plans
accordingly. 
Increase the number of
children accessing specialist
provision within Argyll and
Bute.
The numbers of children accessing
Learning Centres and Parklands school
have increased for session 2024 -25
across the local authority and the staffing
levels have been adjusted accordingly to
allow this provision to take place.
Maintaining the current staffing
complement who support ASN
in line with our nurture stretch
aim agreed with Scottish
Government.
Current complement of
central staff- 1 Principal
Teacher and 2
Teachers will be
maintained through
Stretch aims are achieved:
Literacy 68.4%, Numeracy
75% School Leavers with 1 or
more pass at SCQF Level 5 
88.81%., School Leavers with
Targeted nurture:
Completed:        18 schools, 22 pupils
Ongoing:            7 schools, 7 pupils
Whole-school accreditation:

Page 7

Appendix 1 
7
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
maintaining teacher
numbers. The number
of schools engaging
with Our Children Their
Nurture Education will
increase to 35. 
1 or more pass at SCQF Level
6 68.5% 
46 schools now on board, including new
cohort
Bronze – 22 schools 
Silver – 6 schools
Gold – 1 school
Breakdown of schools:
46 schools in total across 4 cohorts
33 primary schools
6 secondary schools
7 ELC/nurseries  
We are in the process of gathering data in
order to measure progress against our
nurture ‘plus’ stretch aim. This will be
confirmed by end of June 2024. 
Roads and pathways; connections to, from and within Argyll will be supported. 
Reviewing our approach to road
repair prioritisation to make the
most effective use of resources
in the context of budget
pressures and to achieve the
best possible balance in terms
of strategic, operational and
member input. 
Roll out programme of
member engagement. 
Increase member satisfaction
with programme approach.  
Seminar/member workshop delivered in
January 2023 followed up by Business Day
meetings in October/November 2023
followed by Area Committee meetings in
March 2024. This process has provided 
well-received refresher training and in the
case of new members, provided a good
foundation on which to build knowledge
and understanding of the asset
management approach to road
maintenance. Feedback from Members has
been largely positive.

Page 8

Appendix 1 
8
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
Initiating plans for a 20mph
speed limit by working in
partnership, and in line with
national legislation, on the
rollout and delivery of a 20mph
limit where that will work best for
our communities. 
Undertake surveys and
assessments of
settlements on 20mph
zones to return to
Transport Scotland.
Complete assessments and
return to Transport Scotland.
Completed assessments have been
returned to Transport Scotland for the roll
out of the 20mph zones.   
There are mixed views as to whether this
should be universally rolled out – further
discussions to take place with Elected
Members while we await the outcome of
the assessments.  
Completing a review of parking
and traffic
management/enforcement to
reshape arrangements that
reflect community needs and
ambitions. 
Commission review and
submit findings and
recommendations to
members. 
Review the opportunity to
better manage traffic
management/enforcement and
prepare a clear set of
proposals Members’
consideration. 
This forms part of the RIS Review which
will be reported to the June EDI Committee
with further changes progressing.   
Piers and harbours 
Upgrading the council’s harbour
infrastructure to ensure it is
capable of receiving existing
and planned new ferries
(including at
Craignure, Fionnphort/Ruahaich,
Port Askaig, Dunoon, Kilcreggan
and Campbeltown, Tayinloan -
Gigha).
Design for
Iona/Fionnphort. 
Business case for
Craignure, ground
investigation. 
Consultation returns for
Dunoon/Kilcreggan. 
Completion of design for
Iona/Fionnphort. 
Completion of business case
for Craignure, ground
investigation. 
Consultation data returns
prepared by consultants to
present a proposed preferred
option, which will be report to
Members and the public.  
Iona/Fionnphort: Design for Iona complete
and works have been tendered.  Design
substantially complete for Fionnphort.  
Craignure: Delays to Ground Investigation
works due to additional requirements from
Nature Scotland regarding marine
mammals. Ground Investigation delayed
from Autumn 2023 to Spring 2024.  
Kilcreggan: Consultation exercise for
Dunoon - Kilcreggan carried out. Vessel
replacement programme postponed by
Scottish Government which prevents any
further design and development of the

Page 9

Appendix 1 
9
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
Development of
business case for
extension of Oban
North Pier. 
Complete development of
business case for extension of
Oban North Pier. 
marine infrastructure (vessel type and size
needs to be confirmed prior to designing
the infrastructure to ensure compatibility).  
Oban North Pier: Extension of North Pier
business case on hold pending the
completion of the HRO for Oban Bay. 
There was complete agreement with
Harbour Board Members, officers and legal
team that the business case should
logically follow on from the HRO. 
In the meantime we have proceeded with
the survey and assessment of the existing
pier, which is required for the Business
Case and as we are building on an existing
appraisal report the business case can be
expedited rapidly.
Creating a new municipal
harbour authority in Oban,
ensuring that proposals are
submitted to Scottish ministers
as soon as possible following
consideration by the Harbour
Board in December 2022, and
putting preparations in place to
commence operations upon
approval by ministers. 
Establish a Municipal
Harbour Authority with
an up to date and
modern Harbour
Revision Order.
Finalisation of Harbour
Revision Order.
Formal consultation for the HRO carried
out. Circa 100 representations received
with the majority of these responded and at
the time of writing there are a couple of
legal matters to be confirmed. Following
this all the representations will be returned
to Transport Scotland for their
consideration before being put in front of
the Cabinet Secretary who will determine
the Order. 
Seeking funding for the
procurement of new council-
operated vessels including
Islay/Jura, Luing and Easdale.
Carry out assessment,
specification and
costing of new vessels.   
Secure funding for new
vessels based on priority
requirement.  
Discussions ongoing with Transport
Scotland on the age of the vessels and the
risks faced by Argyll & Bute Council. To
date no funding secured for vessel

Page 10

Appendix 1 
10 
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
Request funding from
Scottish Government
and/or explore other
funding opportunities.   
replacements. Consideration for other
sources of funding being explored. 
Finalising the demand,
economic impact and business
case assessment for the
Helensburgh Pier strategy in
2023. 
Commission
consultants to
undertake feasibility
study into future users
of the pier.  
Consider study from
consultants. 
Clear recommendation(s)
submitted for Members’
approval.  
Report presented to the EDI Committee in
November 2023, where the committee
accepted the consultant’s findings and
agreed that officers would no longer devote
resources to pursuing a Council funded
berthing facility.  
The Committee also agreed that the Head
of Development and Economic Growth
would engage with Helensburgh
Community Council and any other
appropriate community group(s) who may
express a wish to pursue options, including
a potential asset transfer of Helensburgh
Wooden Pier. 
Waste and recycling services; reduce our carbon emissions. 
Delivering a solution that
enables the council to divert its
biodegradable waste from
landfill, within 2026, while
seeking a short term derogation
to allow the PPP contract to
expire.
Engagement with
Scottish Government to
secure derogation for
new waste transfer
model on islands.   
Negotiate new contract
to replace the existing
Helensburgh and
Secure derogation from
Scottish Government to
enable the PPP contract to run
to its natural end in September
2026, this being nine months
beyond the introduction of the
BMW landfill ban.   
New contract to replace the
existing Helensburgh and
Lomond area contract with a
Ongoing discussions with Scottish
Government Ministers and officials since
December 2022. With the passage of time,
the derogation has become less attractive
and our ask to SG is for a financial
contribution of circa £1.5M. 
The previous waste contractor, Barr
Environmental Ltd (BEL), gave notice that
they were to cease trading on 31 March

Page 11

Appendix 1 
11 
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
Lomond area contract
with a BMW compliant
contracted solution. 
Commence an EfW
procurement by the end
of the year for current
waste PPP areas.   
BMW compliant contracted
solution. 
Procurement commenced for
EfW. 
2024. The team have put in place new
arrangements to cover the services
previously provided by BEL. 
Positive discussions progressing with
Renewi with an update report due at the
June EDI Committee seeking approval to
progress a contract variation with the PPP
contract on the basis that we are not
expecting a derogation to be put in place.
This includes provision for EfW. 
Encouraging households to
increase use of recycling
services to reach at least the
Scottish average (with service
exploring options to stretch
targets where possible). 
Carry out marketing
and publicity campaign
– e.g. Food Waste
Awareness campaign,
Green July (which will
also include waste). 
Officers review the recycling
rate to see if the campaign has
had an impact. 
Resource from Zero Waste Scotland has
been secured – ZWS have undertaken a
composition analysis which will assist in
producing a Recycling Strategy (first draft
has been produced with further work
required). The composition analysis will
help inform any future marketing to ensure
that the appropriate audience and
marketing message can be achieved. 
The Council worked with Zero Waste
Scotland to refresh the recycling section of
our website to streamline our messaging
and reflect best practice. The new pages
were completed in early March. We have
had some emails from the public
commenting on the information being
“excellent”.

Page 12

Appendix 1 
12 
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
A two-week social media campaign to
promote the new pages on the website ran
from 18 – 29 March and covered messages
around reduce, reuse and recycle, and
included a post about businesses having a
legal duty towards recycling. 
A second social media campaign will take
place in June and focus on behaviour
changes which would help reduce the
amount of waste going to landfill and
pointed customers to supporting
information, either on the council website or
third-party sites. 
Marketing will continue with regular posts,
and campaigns, throughout the year. 
Housing 
Supporting the provision of over
1,000 affordable homes by 2027
(247 in 2022/23 plus at least
750 additional homes over the
life of the Strategic Housing
Investment Plan). 
Submit business case
for housing to
government through the
Rural Growth Deal. 
Successfully submit Business
Case. 
OBC has been submitted for Tobermory
element of Rural growth Deal.  Contract let
and due on site May 2024 to install road
and infrastructure. 
Housing Emergency Action Plan being
finalised following Housing Summit, will be

Page 13

Appendix 1 
13 
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
Look at number of
properties required to
be completed in
2023/24 - target agreed
in Local Housing
Strategy is 215 units. 
Submit the Annual
SHIP for approval to
Council in September. 
Review number of completions
against target set. 
Annual SHIP approved by
Members and submitted to the
Scottish Government. 
presented to the EDI Committee and
ultimately incorporated in Councils LHS
Action Programme. 
70 new build units were completed in
2023/24. We are working with Housing
Association partners to enable 'buy back'
acquisitions which will boost the delivery of
affordable housing units. In addition, the
Council has approved Strategic Housing
Fund grants to enable NHS properties to
be brought back into use. Work has also
started on the Council's Housing Rural
Growth Deal project which will deliver up to
12 properties for workers on Mull. 
SHIP has been submitted to SG and
approved in Oct 2023.
Exploring additional options to
increase the availability of all
tenures of housing - mid market
rents, shared equity, affordable
by design and other
developments - in the area. 
Housing delivery group
will identify alternative
opportunities to deliver
all tenures of housing. 
Review Local Housing
Strategy in light of
declared Housing
Emergency. 
Update Housing Strategy
Approved by Members. 
Ref previous row: Housing Emergency
Action Plan being developed and leading to
revised LHS Action Programme in Autumn
2024.
Considering the implementation
of short term lets control zones
Undertake an
evidenced based
assessment of the
Completion of assessment.  Short Term let licensing still underway. 
Mapping license applications underway.

Page 14

Appendix 1 
14 
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
to open up more housing
availability. 
appropriateness of STL
Planning Control
Zones. 
Outline options presented to Senior Policy
Leads in June 2024 and officers will then
map out detailed statutory process and
complete compilation evidence base.  
Continuing to support
households to improve energy
efficiency and tackle rising living
costs through annual investment
through and implementation of
the Home Energy Efficiency
Programme in Argyll and Bute. 
Liaise with Scottish
Government and
stakeholders to
maximise funding. 
Target for 2023/24 is to
support 280 private
sector
properties/households
with energy efficiency
improvements, as
agreed in the Local
Housing Strategy.   
Officers will work with
ACHA to develop
special projects which
may secure additional
funding.   
Secure HEEPS funding for
Council led schemes.  Review
the offer in principle of £1.9m
from the Scottish Government,
which the Council then submit
an application for. 
2023/24 HEEPS ABSS completed on
schedule.   
Application submitted and awaiting formal
award from SG anticipated June 2024. 
The Home Energy Efficiency Programme:
Area Based Scheme is delivered across
Argyll and Bute with particular emphasis on
remoter rural and island communities. 
During 2023/24 a total of 307 private sector
households received energy efficiency
measures through the programme. 
The Council worked in partnership with
ACHA to help insulate privately owned or
privately rented properties in multi-tenure
blocks which included ACHA owned
properties.

Page 15

Appendix 1 
15 
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
During 2023/24, the Scottish Government
awarded funding of £633,600 to complete
works in Bute and Tarbert.
Developing the opportunity for
the council to become a Rural
Housing Body - where it would
be more directly involved in the
delivery of housing or land for
housing. 
Submit to Scottish
Government evidence
and request for Argyll
and Bute council to
become a Rural
Housing Body
Secure permission to become
a Rural Housing Body.
Housing Body has been awarded.  Will
develop policy for Rural implementation. 
Communities; we will build and strengthen our communities as attractive, vibrant
places to live, work and do business. 
Creating area plans for all our
communities, reflecting
investment opportunities and
local service prioritisation. 
Agree approach,
method and resources
to commence
development of area
plans.
Commence co-
production of area
plans. 
Agreed process and
engagement commenced. 
Seeking ways of securing more
community wealth building
opportunities across Argyll and
Bute and supporting
communities to gain maximum
benefit from developments in
their area. 
Map current community
wealth activity through
the work of Argyll and
Bute Third Sector
Interface. 
Completion of mapping of
current activity.

Page 16

Appendix 1 
16 
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
Seeking to maximise scope for
community involvement and
participation, including exploring
the role that community
transfers can play. 
Develop a proactive
approach to support
greater community
participation in asset
transfers.
Six monthly reporting on
expressions of interest
received from community
groups
Information, advice and guidance for
community bodies who are interested in
making formal requests has been
developed and is on the Council’s website 
Quarterly reports were provided to
Members rather than six monthly. 
Potential and growth; turning opportunities into reality. 
Economic Development 
Achieving sign-off of the Rural
Growth Deal business and
cases and begin delivering
priority projects like The Marine
Industry Training Centre, UAV
Drone Hub and Seaweed
Academy. 
Complete outline
business cases (OBCs)
and key documents
required for approval of
Scottish and UK
Governments in order
to sign the Full Deal
Agreement and
commence draw down
of RGD funding.
Full deal sign off.  Full deal signing scheduled for 7th June
2024.  Full Deal signing was planned for 7
June however due to General election this
will be delayed.   All projects now at Outline
Business Case (OBC)Stage with a number
of OBC’s nearing endorsement by
Government.  Rothesay Pavilion at full
Business Case stage.  
Securing of Levelling Up funding
for projects, including Argyll and
Bute Western Seaboard Marine
Gateways Initiative, Whisky
Islands and Lorn Economic
Growth Zone. 
Bid in 2022 was not
successful – consider
and scope out
proposals for next
round in alignment with
the UK Government’s
guidance.  
Submission of a bid to
Levelling Up Fund, as per
guidance set by the UK
Government. 
£20m allocated via UKG Levelling Up
Partnership funding.  Long list of project
options currently being considered.  UKG
will decide which projects will be funded.
Implement £4.5m Argyll and
Bute UK Shared Prosperity
Fund Investment Plan.
Commence
implementation of
Argyll and Bute UK
Successfully complete first
year implementation plan of
UKSPF.  
This Plan remains on track with all
individual elements being taken forward
and submitted to the UK Government in

Page 17

Appendix 1 
17 
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
Shared Prosperity Fund
(UKSPF) Investment
Plan. 
line with Audit requirements.  This includes
the approval of 9 community projects at the
April Council meeting.
Complete site development of
Helensburgh Waterfront project
securing long-term economic
benefit. 
Marketing of site and
select preferred bidder 
Successful appointment of a
preferred bidder to progress
the development.
Two stage marketing process completed.
Community engagement and retail study
completed. Interviews with 2 remaining
preferred developers completed and final
selected developer will be reported to P&R
Committee in August 2024.
Deliver the £15m Campbeltown
Flood Prevention Scheme.
Implement
Campbeltown Flood
Prevention Scheme 
Complete the implementation
of Campbeltown Flood
Prevention Scheme. 
Campbeltown Food Prevention Scheme is
on track to be completed by June 2024.  
Regenerate the waterfront of
Ardrishaig
Implement public realm
improvements to
Ardrishaig waterfront.
Complete implementation of
improvements to water front
public realm in Ardrishaig
Public Realm upgrades complete.  Scottish
Canals progressing negotiations with a
potential commercial operator on the
former Gleaner Oils site.  
Driving forward additional
strategic economic development
projects including progression of
the Dunbeg housing,
commercial and infrastructure
projects and the North Lorn
Economic Growth Zone through
the Lorn Arc Tax Incremental
Finance (TIF) scheme.
Agree amendments to
Scottish Government
TIF scheme to allow
flexibility for longer term
larger development.  
Apply for planning
consent for phase 4
housing and associated
works. 
Secure TIF amendment. 
Planning consents progressed
for phase 4 housing and
associated works. 
Detailed case for amendment and time
extension of TIF agreement, submitted to
SG.  Expecting decision in summer of
2024.  More Homes Division have funded
planning application for LINK Phase 4
housing development.  Further SI and Cost
Planning carried out. Anticipate planning
application summer / autumn. 
Full Business Case being progressed for
Oban Airport site as agreed at P&R
Committee in May 2024.  
Implement Conservation Area
Regeneration Scheme (CARS)
Projects in Dunoon,
Apply for CARs scheme
for Tarbert
Dunoon and Rothesay
CARs scheme for Tarbert
approved.
Dunoon/ Rothesay CARs -
Tarbert – Final funding applications due to
be submitted to HES and NLF in November
2024.

Page 18

Appendix 1 
18 
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
Lochgilphead, Tarbert and
Helensburgh.
CARs - complete last
priority buildings.
Helensburgh CARs
project on track 
Lochgilphead -
commence first priority
building on site.
complete last priority building.
Helensburgh CARs project on
track 
Lochgilphead - commence first
priority building on site. 
Dunoon and Rothesay – last priority
buildings have been completed.
Helensburgh – First priority building in final
development stage.
Lochgilphead – all four priority buildings on
site with two 95% complete.
Maximising community
economic and employment
opportunities from the
Islay Scotwind offshore wind
project.
Explore development of
supply chain
opportunities for local
businesses. 
Complete assessment and
report on supply chain for local
businesses. 
Regular meetings have been held with 2
off-shore wind developers to discuss
possible use of local ports and supply chain
opportunities.  The project continues to
make progress as the development
undertakes necessary environmental
works, community engagement and
financial appraisals.  
Preparing an options appraisal
for implementation of a transient
visitor levy. 
Consider Bill and
develop a two-stage
consultation process,
consulting with the
tourism industry, local
communities, visitors
and a wider range of
businesses. 
Complete engagement
process, review findings and
report to Members once the
Bill has been released
detailing its provisions. 
The Bill is still progressing through
Parliament with a target of August 24. 
Officers continue to monitor progress and
are awaiting expert guidance on levy
implementation in June 24 before preparing
a public engagement plan on how to
introduce the tourism levy in line with
Government timelines.  ABC is currently
leading this work through the Highlands
and Islands Economic Partnership in an
effort to coordinate implementation of the
levy to provide a level of consistency.   
Commercial services; making assets work now. 
Increasing commercial
development of business and
retail space, including the
Develop businesses
cases for: 
- Kilmory Industrial Park
Complete businesses cases
and to take forward as
appropriate: 
Kilmory Business Park – enabling works
are progressing on site. Legal Agreements
are approaching completion, the Monitoring

Page 19

Appendix 1 
19 
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
Kilmory Industrial Park, and
identifying other opportunities
wherever possible.
- Oban Airport
- Killarow House,
Bowmore
- Lorn House, Oban
- Kilmory Industrial Park
- Oban Airport
- Killarow House, Bowmore
- Lorn House, Oban 
Surveyor has been appointed, and the final
funding application has been submitted.  
Oban Airport – Outline Business Case
completed and reported to P&R Committee
on 9/5/24. Planning consent granted for
TSL unit and UAV Hub  
Kilarrow House / Lorn House – HUB North
appointed to complete options appraisal
due for completion May 2024. Site
investigations commissioned.
Exploring additional commercial
opportunities at Oban Airport.
Develop business case
apply for planning
consent for business
units.
Complete business case and
secure planning consent for
business units. 
Outline Business Case completed and
reported to P&R Committee on 9/5/24.
Planning consent granted for TSL unit and
UAV Hub.
Delivering the Our Modern
Workspace project (OMW),
rationalising the council estate
and facilitating hybrid working
solutions.
Progress delivery of
OMW projects in
Lochgilphead, Oban
and Rothesay
Lochgilphead – agree
implementation plan.
Oban – complete office
rationalisation.
Rothesay – Complete phase 1
capital works. 
Oban and Rothesay Complete and
operational.  
Initial information gathering underway for
Lochgilphead and Visioning workshops for
Kilmory Redesign scheduled for May 2024.
Leading the development and
creation
of Craigendoran Business Park
as a business, engineering and
innovation hub. 
Prepare business case
as part of Rural Growth
Deal (RGD).
Completed business case to
allow RGD sign off. 
Site investigations completed and
infrastructure costings due for completion
in May 2024. Outline Business Case has
been completed and is out for external
consultation.
Exploring opportunities for
sharing services where possible
- both to help grow our income
Implementation of new
shared management
structure with HSCP in
New shared management
structure with HSCP in relation
to Hostels and Care Homes
Management of the catering and domestic
teams within Care Homes and Hostels
commenced in July 2023. Service

Page 20

Appendix 1 
20 
Priority  Activity 2023 – 2024 Success Measure 2023 -
2024
Annual Update 
through providing our expertise,
and enhancing service delivery
in communities where we need
to source options from
elsewhere. 
relation to Hostels and
Care Homes for
catering and cleaning
for catering and cleaning
operating and delivering
efficiencies. 
improvements have been implemented and
income generation opportunities are being
explored. On-going savings options are
being reviewed.
Driving down further our own
carbon emissions, achieving net
zero by 2045 and exceeding our
target of a 75% reduction by
2030, building on our good track
record in relation to combatting
climate change, through the
delivery of our Decarbonisation
Plan.
Progress Argyll and
Bute Decarbonisation
Plan for 2022 – 2025.
Deliver against agreed
performance for Argyll and
Bute Decarbonisation Plan for
2022 – 2025 including the
tender and appointment of
supporting consultancy to
assist Officers with
development of new
Decarbonisation Plan by
December 2025.
Public Bodies Climate Change Duties
Report 2022/23 confirms annual Council
emissions of 26,512 tCO2e, representing a
reduction of 1,705 tCO2e compared to
2021/22, and longer-term reduction of
12,952 tCO2e compared to 2015/2016
figure.
Continued engagement with HubNorth to
progress tender and appointment of
consultancy support to support
development of new Council Net Zero
Routemap, which will supplant current
Decarbonisation Plan.
Securing Carbon Literate
Organisation status by the end
of 2023, including completion of
the rollout of carbon literacy
training to all councillors. 
Securing Carbon
Literate Organisation
status by the end of
2023
Deliver more training -
application for Carbon
Literate Organisation
submitted and await
outcome. 
Achieve bronze status and
working towards silver status.
Bronze Climate Literate Organisation
Status achieved in 2023.    
Developing plans to progress towards
Silver status, initially on a departmental
basis.

Page 21

Appendix 1 
21 
Partnership and Action - everyone has a part to play in Argyll and Bute’s success 
  
In our Priorities for the Council Term 2022 to 2027, we have set out our areas for action to deliver our vision for Argyll and Bute.
There are elements of that vision which require action from other agencies at all levels - from our communities right up to national
government. We will commit to working in partnership wherever we need to as well as calling on others, with responsibility, to take
the action that is required to safeguard Argyll and Bute’s success. This will include: 
  
1. Continuing to build up our strong track record in partnership working and seeking new ways of working with communities,
other organisations, and the third and private sectors. 
2. Continuing to work in partnership with further education and higher education providers in Argyll and Bute to ensure young
people have access to high quality innovative educational opportunities that support local employers and the Argyll
economy. 
3. Lobbying for support for the higher-than-average energy costs faced by Argyll and Bute communities. 
4. Pressing the case for retaining delivery of care services locally, where community knowledge, relationships and experience
are best placed to identify and meet local needs and local accountability. 
5. Calling for funding support to tackle challenges in local social care delivery - including recruitment, retention and
development of care staff in communities - rather than centralisation of services. 
6. Continuing to call for planning, construction and opening of the replacement route at the Rest and Be Thankful within the
life of the this Scottish Parliament 
7. Working in partnership with the Rothesay Pavilion Charity Trust to lobby for funding to complete the refurbishment of the
Pavilion. 
8. Seeking additional funding support to address the unprecedented severe weather damage to the sea defences supporting
Bute’s main island roadway at Ardbeg. 
9. Working with the Community Planning Partnership to develop a Climate Change Strategy for the region as a whole. 
10. Adding our voice to those of our local government colleagues across Scotland to call on national government for fair
funding settlements which enable councils to deliver the services that matter to communities, and reinforcing the need for
recognition of the vital contribution that local government makes to national priorities and Scotland’s overall success.