ARGYLL AND BUTE COUNCIL            POLICY AND RESOURCES
COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH                  20 FEBRUARY 2025 
CONSERVATION AREA REGENERATION SCHEME (CARS) PROJECT 15-19
ARGYLL STREET, LOCHGILPHEAD 
1.0 EXECUTIVE SUMMARY 
1.1 The Lochgilphead Conservation Area Regeneration Scheme (CARS) is a grant
programme focussing on the regeneration of historical buildings as well as
traditional skills training and community engagement.   Lochgilphead CARS is
jointly funded by Historic Environment Scotland and Argyll and Bute Council
together with contributions from building owners. 
1.2 Following a robust assessment, 15-19 Argyll Street has been selected as the
final priority building for Lochgilphead CARS and was awarded CARS Grant
by Area Committee on the 4th December 2024. The external fabric of the
building requires attention to address water penetration issues.  The proposed
communal repair works and maintenance plan will safeguard the building for
the next sixty years. 
1.3 Following a competitive tender process, the total project costs exceeded the
identified project budget. However, by removing non-essential items from the
works, the budget shortfall has been reduced to £21,220.   
1.4 Accordingly, this report seeks approval to award an additional PSHG grant of
£21,220, to help bridge the budget shortfall.  This award would fully utilise the
remaining balance from the original £186,220 PSHG allocated to
Lochgilphead CARS, by the Policy and Resources Committee on 13th
December 2018, and approved by Full Council on 21st February 2019.      
1.5 RECOMMENDATIONS 
Members approve utilisation of the £21,220 balance of Private Sector Housing
Grant (PSHG) allocated to the Lochgilphead CARS projects by Full Council
on 21st February 2019 to bridge the funding shortfall at the 15-19 Argyll Street
Lochgilphead CARS project.

Page 2

ARGYLL AND BUTE COUNCIL            POLICY AND RESOURCES
COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH                  20 FEBRUARY 2025 
CONSERVATION AREA REGENERATION SCHEME (CARS) PROJECT - 15-19
ARGYLL STREET, LOCHGILPHEAD 
2.0 INTRODUCTION 
2.1 This report seeks approval to award an additional £21,220 Private Sector
Housing Grant (PSHG) to help meet the funding shortfall at 15-19 Argyll
Street, Lochgilphead which is the final priority building in the CARS project.   
3.0 RECOMMENDATIONS 
3.1 Members approve utilisation of the £21, 220 balance of Private Sector
Housing Grant (PSHG) allocated to the Lochgilphead CARS projects by Full
Council on 21st February 2019 to bridge the funding shortfall at the 15-19
Argyll Street Lochgilphead CARS project. 
4.0 DETAIL 
4.1 15-19 Argyll Street, Lochgilphead is comprised of a single storey and attic of
residential accommodation providing two flats over a fully commercial ground
floor that contains a Butcher / Greengrocer business. The business supports 
seven jobs and provides a valuable contribution to the community. 
4.2 The general fabric of the building is in very poor condition and is suffering from
water penetration issues.  Photographs are included at Appendix 1. There is
damp ingress in the top floor flat.  This is having a negative impact on the
occupiers quality of life and the building is detracting from the townscape and
character of the Lochgilphead conservation area.  
4.3 The scope of works for the project includes slated roof works, leadwork, chimney
repairs, stonework and cast-iron goods restoration. 
4.4 Lochgilphead CARS and Housing Services staff have been working with the
owners of this property since early 2022.  The owners formed an Owners

Page 3

Association and commissioned a Design Team to carry out a Tenement
Condition Survey and to produce a Tenement Condition Report.   
4.5 In June 2024 the Association appointed a Design Team to progress with the full
design and development of the repair project.  A tender costs for the works was
established, however these were in excess of the already identified funds of
which were:
• PSHG Grant in accordance with the Scheme of Assistance £22.2k
• CARS Grant of  £166.46k
• Owners contribution £20k. 
Subsequently cost savings have been identified to remove all non-essential
elements, and that has reduced the funding gap to £21,220. 
4.6 To bridge the shortfall and to ensure that the necessary repairs to 15-19 Argyll
Street are carried out, it is proposed that an additional PSHG grant of £21,220
is allocated towards the project.  This additional funding represents the
remaining balance of the original PSHG allocation to Lochgilphead CARS, as
referred by the Policy and Resources Committee on the 13th December 2018
and approved by Full Council on 21st February 2019. 
4.7 If approved, it is proposed that work can start at 15-19 Argyll Street in March
2025. 
5.0 CONCLUSION
5.1 The additional funds proposed would safeguard the fabric of one historic 
building, ensuring the continued use of 1 commercial and 2 residential units. 
As such they represent an appropriate and important use of the remaining
PSHG allocation to Lochgilphead.   
6.0 IMPLICATIONS
6.1 Policy – The Outcome Improvement Plan, Economic Strategy and Local
Development Plan support town centre regeneration and a diverse and thriving
economy.
6.2 Financial – The proposed use of PSHG grant funding falls within the criteria
for use of PSHG and will appropriately utilise capital budget which will otherwise
remain unspent in this financial year.  
6.3  Legal – Third party grant contracts will be issued to the private building owners.
6.4  HR - A dedicated project officer is in post for the duration of the Lochgilphead
CARS project.  Staff salaries are included in the project budget.
6.5  Fairer Scotland Duty - 
6.5.1   Equalities - protected characteristics – None.

Page 4

6.5.2   Socio-economic Duty – None. 
6.5.3  Islands – None.
6.6 Climate Change - Extremes of weather caused by climate change will
continue to put buildings under pressure. These projects help property owners
undertake large scale building repair projects under the supervision of
conservation accredited architects which ensures they are future proofed
against climate change, using traditional building materials.    
6.7 Risk – That grant schemes are oversubscribed or that projects run over time or
budget. These risks will be carefully monitored and mitigation measures
introduced on a case-by-case basis.
6.8  Customer Service – The council is responsible for administering the CARS 
grants on behalf of HES and for ensuring due diligence in the performance of
its duties. 
6.9 The Rights of the Child (UNCRC) – none. 
Kirsty Flanagan Executive Director with responsibility for Development and
Economic Growth 
Fergus Murray, Head of Development and Economic Growth
Councillor Jim Lynch, Policy Lead for Economic Development, Islands and
Rural Communities, Housing 
6th January 2025                                                  
For further information contact:
James Lafferty: Lochgilphead CARS Project Officer
james.lafferty@argyll-bute.gov.uk 
Flora Lamont: Team Lead – Housing Operations 
flora.lamont@argyll-bute.gov.uk 