Democracy Spraffa

Appendix 1 - Draft Sustainable Procurement Strategy 2025-28 - 050225

Argyll and Bute Council · 20 February 2025
Back to Policy and Resources Committee — 20 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Appendix 1  
DRAFT
Sustainable Procurement
Strategy
2025/2028

Page 2

Section 1 - Overview ........................................................................................... 1
Section 2 - Introduction ....................................................................................... 3
Section 3 - Procurement Vision & Mission Statement ........................................ 5
Section 4 - Strategy Rationale & Context ........................................................... 8
Section 5 - Aims, Objectives, Key Priorities & Action Plan ...............................11
Section 6 - Procurement Strategy by Category ................................................29
Section 7 - Financial Analysis & Key Performance Indicators (KPIs) ...............39
Section 8 - Implementation, Reviewing & Reporting ........................................43
Section 9 - Policies, Tools & Procedures ..........................................................45
Section 10 - Glossary..........................................................................................48
Section 11 - Strategy Ownership & Contact Details ...........................................53 
Contents

Page 3

Section 1: Overview    Page 1 of 53    Back to Contents 
Procurement plays a pivotal role in supporting the council’s Corporate Plan for 2023 to
2027 and will continue as a key enabling strand within the ongoing reform and continuous
improvement of the council. This Sustainable Procurement Strategy sets out the vision,
objectives, key priorities and actions which will direct and govern procurement activities
across the council for 2025-2028. These reflect the key challenges and commitments of
the council’s Corporate Plan, in addition to supporting a variety of council strategies and
national and local policies 
The strategy relates to our overall spending approach, with specific focus on regulated
procurements. Regulated procurements are defined as works contracts over £2million in
value, and supplies and services contracts over £50,000 in value. 
It shows our continued commitment to focus and promote robust and fair working
practices within our supply chain and contracts, our aim to shape and influence
innovative solutions and to ensure the council delivers ethically sourced goods, services
and works across its commercial spend profile, whilst striving to support and create
contract opportunities for more Argyll and Bute based suppliers, Social Enterprises, Co-
operatives, Supported Businesses and Third Sector Organisations 
Local businesses and the third sector play a valuable role in supporting the work of the
local authority. The strategy aims to help remove the barriers often faced by smaller
organisations with limited resources in bidding for work tendered by the council. 
The Procurement, Commercial and Contract Management Team (PCCMT) has provided,
and will continue to provide, support to local organisations by structuring tender
opportunities, wherever possible, to enable local organisations to bid for council contracts
and by building their capacity to respond to formal procurements through local Meet the
Buyer and other training events, and through promotion of the Supplier Development
Programme (SDP). 
For this strategy to support the Corporate Plan and significant financial pressures faced
by the council, we will explore digital and automation opportunities, strengthen existing
strategic internal and external partnerships and further develop relationships between
procurement, service areas, and collaborate further with our key suppliers. 
We will continue to generate process efficiencies and further cash savings opportunities
through rigorous challenge of all our purchasing decisions, continue to work more
cohesively and collaboratively with our internal clients and external stakeholders to
identify better ways of working and ensure best value is achieved for all commercial
spend through improved contract management activity. 
Section 1 - Overview

Page 4

Section 1: Overview    Page 2 of 53    Back to Contents 
For this strategy, the council has five key strategic procurement objectives:
❖ Good governance.
❖ Value for money to support council’s financial challenges.
❖ Empowering local suppliers, supporting community wealth building and local
economic growth.
❖ Provide effective and efficient procurement for our stakeholders.
❖ Procurement to be a strategic partner for all our council services.

Page 5

Section 2: Introduction   Page 3 of 53    Back to Contents 
2.1 This Sustainable Procurement Strategy sets out the vision, objectives, key
priorities and actions which will direct and govern procurement activities for Argyll
and Bute Council during 2025 to 2028.
2.2 In the face of significant challenges, including economic pressures, climate
change, and evolving community needs, we recognise the power of procurement
as a strategic tool. It is not just about buying goods and services; it is using our
buying power to create more positive impacts on the economy, society, and the
environment. Our strategy shifts from a transactional approach to a strategic,
data-driven, and value-based one. 
2.3 We aim to maximise the impact of public funds, ensuring that every pound spent
contributes to sustainable solutions that address community needs. Sustainability
is at the core of our public procurement efforts. We not only want to deliver
efficient and cost-effective services but also, actively address poverty, promote
social wellbeing, boost the local economy, and mitigate climate change.
2.4 Sustainable procurement means making purchasing decisions that balance
environmental protection, social progress, and economic development, both for
present and future generations. For the council, this means:
• Environmental Sustainability: Making procurement decisions that minimise
negative environmental impacts, support climate resilience, and contribute to
our net-zero targets through reduced carbon emissions, protection of
biodiversity, and responsible resource use.
• Social Sustainability: Delivering positive outcomes for our communities
through fair work practices, skills development, and enhanced community
wellbeing and resilience.
• Economic Sustainability: Creating lasting economic benefits through support
for local businesses, innovation, and long-term value for money.
2.5 The success of our Sustainable Procurement Strategy will be dependent upon
having the right people, processes, and technology in place to support its
implementation. It requires a shift in mind-set and behaviour, a commitment to
professional development commitment and a focus on collaboration. Above all,
we must adhere to our core principles of accountability, equity, legal compliance,
strategic importance, sustainability, and value delivery.
2.6 These reflect both national and local policies and priorities, and includes our
approach to, Suppliers’ Fair Working Practices and Ethicality, Sustainability,
Climate Change, Corporate Social Responsibility, Small and Medium-sized
Enterprises (SMEs), Supported Businesses, and Third Sector organisations.  
Section 2 - Introduction

Page 6

Section 2: Introduction   Page 4 of 53    Back to Contents 
2.7 They recognise the current budget constraints and an increasing demand for
goods, services and works.
2.8 Procurement is a key strategic driver to enable the business community and the
communities we serve to adapt, diversify and flourish despite economic
pressures. The present economic landscape has created unique but not
insurmountable challenges for the area.
2.9 Procurement plays a pivotal role in supporting the council’s Corporate Plan and
will continue as a key enabling strand within the ongoing reform and continuous
improvement of the council.
2.10 The Argyll and Bute Council Sustainable Procurement Strategy 2025/2028
relates to our overall procurement approach, with specific focus on regulated
procurements.  Regulated procurements are defined as works contracts over
£2million in value, and supplies and services contracts over £50,000 in value.
2.11 This Sustainable Procurement Strategy has been prepared in response to the
changing procurement agenda and the current financial climate. This strategy
sets out the procurement aims and goals of the council for 2025/2028 and will be
updated on an annual basis. These aims and goals reflect both national and local
policies and priorities. Through adhering to the Sustainable Procurement
Strategy, the council will manage and mitigate the potential risks associated with
public sector procurement.  Such risks include the potential for challenge from
unsuccessful tenderers, the risk of not achieving best value for council services,
and failing to support the council’s strategic aims.

Page 7

Section 3: Procurement Vision
and Mission Statement   Page 5 of 53    Back to Contents 
The council’s vision “We are working together to attract people to live and work in the
area, and to build a prosperous future for Argyll and Bute”.
The following procurement vision and mission statements have been established to
support the council’s vision and to ensure the delivery of sustainable, effective and
efficient procurement.
Our vision
To be recognised as a strategic partner to all council services, optimising a collaborative
and innovative approach to support the economic, social and environmental needs of the
residents of Argyll and Bute whilst delivering best value.
Mission Statement
To deliver procurement for our stakeholders to support the delivery of high quality,
sustainable public services that empowers our communities, and supports economic
growth.  We are committed to sustainable procurement, ensuring best value is achieved
whilst delivering sustainable outcomes to meet the needs of our communities in Argyll
and Bute.
How Procurement Will Support Council Objectives
The Procurement Reform (Scotland) Act 2014, places a sustainability duty on the council,
which requires us when we are carrying out a regulated procurement, to consider how
our procurement process could: 
• improve the economic, social environmental wellbeing within our area;
• facilitate the involvement of small and medium enterprises, third sector bodies and
supported businesses in the process; and
• promote innovation.
This approach fits well with the council’s own corporate priorities as detailed in our
council’s Argyll and Bute Outcome Improvement Plan. 
Argyll and Bute Council is working with our partner organisations to deliver this vision for
our area: our economy is built on a growing population. In other words, we are working
together to attract people to live and work in the area, and to build a prosperous future
for Argyll and Bute.
The Outcome Improvement Plan sets out three outcomes that help us achieve our vision: 
Section 3 - Procurement Vision & Mission Statement

Page 8

Section 3: Procurement Vision
and Mission Statement   Page 6 of 53    Back to Contents 
• Outcome 1: Transport Infrastructure
• Outcome 2: Housing
• Outcome 3: Community Wellbeing     
The council’s priorities support the council in serving the interests of Argyll and Bute.
We are focused on creating and making the most of opportunities while continuing to
deliver quality services.
In addition, the strategy aligns with the wider public sector policy objectives set out in the
Public Procurement Strategy for Scotland. 
This strategy, therefore, looks to put sustainability at the heart of our public procurement;
using it to help deliver on our wider strategic vision and ambitions for Argyll and Bute,
both in terms of our people and place. 
By doing so, we hope to send out a clear message to the people of Argyll and Bute, our
public partners and the business community, including SMEs and third sector
organisations; that we are committed to using our procurement power, not only to deliver
efficient and cost-effective services, but also to: 
• continue working to address the impact of poverty
• promote and enhance social wellbeing and build resilience within our communities
• help grow our local economy, to create jobs for future generations
• help mitigate the impact of climate change and reduce our own carbon footprint
This approach will require a shift in mind-set and behaviour to move our public
procurement from the transactional and reactive to a proactive, data driven strategic
function. The strategy also acknowledges the need to ensure that we have the necessary
professional procurement capacity and capability in place, together with the processes,
and tools to ensure the best possible procurement service for Argyll and Bute.
As a Procurement Team, supported by our Scottish Public Procurement community, we
have a key aim to ensure that the collective spending power of the public sector is used
to deliver world class, value-adding collaborative procurement services, while enabling
sustainable and inclusive economic growth. As such, this strategy is aligned to the
Scottish Government’s published Public Procurement Strategy for Scotland. Its vision is
to put public procurement at the heart of a sustainable economy to maximise value for
the people of Scotland.

Page 9

Section 3: Procurement Vision
and Mission Statement   Page 7 of 53    Back to Contents 
Within procurement we have outcomes outlined by the Sustainable Procurement Duty,
which requires us to buy in a way which is: 
These outcomes, which are supported by Scottish Government policies and guidance as
well as sectorial and organisational policies and guidance, underpin and enable our work.

Page 10

Section 4: Strategy Rationale
and Context   Page 8 of 53    Back to Contents 
4.1 Our principal aim is to ensure the principles of public procurement - transparency,
integrity, openness, fairness, non-discrimination, equal treatment, competition
and accountability - underpin our procurement activity.  
4.2 This strategy aims to build on the achievements and benefits derived from the
council’s previous Procurement Strategy 2021–2024, with a view to:
• All procurement opportunities are advertised, tendered and awarded
electronically.
• All complex procurement exercises are supported by detailed sourcing
strategy documents.
• Community benefits are considered for all procurement exercises above
£100,000 for goods and services; and £2,000,000 for works.
• Sustainability considerations are included for all regulated procurements.
• If the market allows for it, for goods/services under £50,000 and works under
£2million, SMEs and local suppliers are invited to bid for these contracts.
• Development of a robust, segmented contract management process.
• Using the power of procurement to deliver beneficial outcomes for the
residents of Argyll and Bute, local businesses and the local area. 
• Support the council’s key strategies, climate plan and net zero targets.
• Make sure we comply with the new procurement regulations. 
• Integrate Community Benefits Wish-list’s within our community benefits
process.
• Continue to promote the benefits of early procurement engagement and
innovation.
• Build capacity and skills within the council to improve procurement, contract
management and commissioning activity.
• Support procurement people of tomorrow. 
The previous procurement strategy was closely aligned with the overall council
plan and delivered many benefits and improvements over the period that it
covered (2023 to 2024). 
These benefits and improvements included: 
Section 4 – Strategy Rationale & Context

Page 11

Section 4: Strategy Rationale
and Context   Page 9 of 53    Back to Contents 
• More commercially focused and category management further embedded
within the council.
• Improved demand management with significant savings achieved.
• Supported the council’s economic and financial challenges by achieving 74
procurement benefits over the period 2023/24.
• No legal procurement challenges – complied with all relevant and statutory
requirements.
• More streamlined processes and procedures.
• More robust sourcing strategies and better value contracts. 
• Improved strategic partnership working and early engagement with service
areas.
• The creation of a community benefit wish list on the council’s website. 
• Fulfilment of our procurement work plans, including the delivery of tenders
supporting special projects such as Lochgilphead Front Green Regeneration
and Campbeltown Flood Prevention Scheme. 
The council’s Sustainable Procurement Strategy for 2025/2028 takes account of
the Annual Procurement Report 2023/2024, which detailed the progress that the
council has made since the previous strategy was published. 
This allows us to reflect on the progress made as well as highlighting the
opportunities and challenges now facing the council, and how procurement can
support the organisations overall objectives. 
We will continue to generate process efficiencies and real cash savings through
rigorous challenge of all our purchasing decisions, continue to work more
cohesively and collaboratively with our internal clients and external stakeholders
to identify better ways of working. This enhances our focus and considers
innovative procurement methodologies to achieve best value outcomes in service
areas such as social care. 
4.3 The council is mindful that the impact of procurement is far greater than this
definition of a ‘process’ and our vision, objectives and principles as set out in this
strategy illustrate the contribution that effective procurement arrangements can
make to wide ranging socio-economic agendas. These include equality and
diversity, a successful local economy, a thriving voluntary and third sector,
environmental issues and value for money for Argyll and Bute residents.

Page 12

Section 4: Strategy Rationale
and Context   Page 10 of 53    Back to Contents 
4.4 Current external impacts are demographic changes within Argyll and Bute,
managing expectations of stakeholders within reduced budgets, environmental
challenges including upcoming changes in relation to waste management and
carbon reduction to meet climate change targets, and the need to ensure our
processes are in line with current best practice.  There is an ever-increasing focus
from the Scottish Government on measuring and managing Scope 1, 2 and 3
emissions across our supply chain, including specific supplier reporting
requirements for Scope 3 emissions from purchased supplies, services and
works. 
4.5 Internal impacts on this strategy and the council’s PCCMT include the need to
take account of the requirements of the Constitution, Corporate Plan and
Outcome Improvement Plan, the provision of support to the service departments
to meet their budgetary requirements, as well as the support provided to them to
deliver transformational change in how they provide their services to the residents
of Argyll and Bute.
4.6 The council will continue to deliver its procurement activities and meet the above
opportunities and challenges in line with the Scottish Model of Procurement and
the Public Procurement Strategy of Scotland:

Page 13

Section 5:  Strategic Aims, Strategic 
Objectives, Key Priorities & Action Plan Page 11 of 53 Back to Contents 
5.1 Our strategic aims 
The strategic aims of the Procurement, Commercial and Contract Management
Team support the overall Argyll and Bute Council Corporate Plan 2023-2027,
specifically to support the council in its mission to deliver our key priorities and
make Argyll and Bute a place people choose to Live, Learn, Work and Do
Business:
• People and Places - our core business as a council.
• Potential and Growth - turning opportunities into reality.
• Partnership and Action - everyone has a part to play in Argyll and Bute’s
success. 
The team recognises the strategic importance of maximising the economic
benefits from directing council spend to local businesses, in terms of benefiting
the local economy to ensure it is growing, diverse and thriving. 
To support delivery of these outcomes, the PCCMT will continue to facilitate
participation from local contractors in the procurement process to increase
opportunity for local spend, where possible, by: 
a. Considering lotting strategies for all contracts and, where appropriate,
dynamic purchasing systems to enable local suppliers the opportunity to
access council contracts. This will be documented in all contract strategies
which will be prepared in advance of procuring all regulated contracts.
b. If the market allows for it, for goods/services under £50k and works under
£2million, SMEs and local suppliers will be invited to bid for these contracts.
c. Simplifying tender documents to ensure the procurement process is
proportionate and easy to navigate. 
d. Delivering an effective programme of supplier engagement and events across
the region aligned to forthcoming contract opportunities, supporting our local
small and medium sized businesses to meet their growth potential.
e. Using community benefits clauses and approaches to help deliver additional
benefits for the communities of Argyll and Bute.
f. Promoting the living wage and wider fair work first practices.
Whilst it would not be acceptable to give preference to local businesses during
any particular procurement, efforts will continue to be made to ensure that local
businesses are given the opportunity to bid for our contracts and to have the
greatest chance of being successful in winning council and other public sector
business. 
Section 5 - Aims, Objectives, Key Priorities & Action Plan

Page 14

Section 5:  Strategic Aims, Strategic 
Objectives, Key Priorities & Action Plan Page 12 of 53 Back to Contents 
5.2 Our strategic objectives 
For this strategy, the council has five key strategic procurement objectives:
• Good governance.
• Value for money to support council’s financial challenges.
• Empowering local suppliers, supporting community wealth building and local
economic growth.
• Provide effective and efficient procurement for our stakeholders.
• Procurement to be a strategic partner for all our council services. 
5.2.1 Good Governance 
Aims
o To ensure all procurement staff and council officers involved in the
procurement process are fully aware of all aspects and impacts of the
procurement rules and any other relevant regulations. 
How we will do it
➢ Mandatory training for council officers involved in the procurement process
(project leads, specification writers) including highlighting the requirement for
project/ contract management, excellent communication skills, varying
contracts, budget variances and social benefits that procurement must
consider (for example, Equality and Fair Work First Practices).
➢ Ongoing training for procurement staff on changes to legislation and
regulations.
➢ Adapt our internal procedures, processes and documentation, where
required, to reflect any new legislative requirements. 
What will the outcome be?
▪ Mitigation of the opportunities for procurement challenge.
▪ Procurement activity will comply with all relevant statutory and regulatory
requirements.
▪ Procurement staff are confident in their understanding of procurement
regulations and other relevant regulations.

Page 15

Section 5:  Strategic Aims, Strategic 
Objectives, Key Priorities & Action Plan Page 13 of 53 Back to Contents 
5.2.2 Value for Money to support council’s financial challenges 
Aims
o Increase opportunities for commercial savings.
o Reduce the value of non-contract spend. 
How we will do it
➢ Continue to target savings and procurement benefits from all aspects of the
strategic procurement process (tender, contract and demand management,
Purchase to Pay (P2P).
➢ We will continue to develop our contract management framework as we
understand that successful contracts depend on good contract management
and good contract management depends on good supplier relations. 
➢ Further embed and improve demand management within the contract
management process.
➢ Ensure that suppliers provide regular management information on our usage
of their contracts and incorporate this information into the contract
management process.
➢ To work closer with our client departments to understand their needs, identify
opportunities to reduce expenditure, control demand and improve process
efficiencies.
➢ Continue to look for opportunities to collaborate in procurement with our
public sector partners and benchmark to ensure that collaborations provide
best value. 
What will the outcome be?
▪ Assisting the council to meet budget savings targets.
▪ Increase contracted spend.
▪ Improved Contract and Demand Management. 
5.2.3 Empowering local suppliers, supporting community wealth building and
local economic growth 
Aims
o To secure wider social, economic and environmental benefits for the local
area and ensure those benefits are realised. 
o Increased opportunities for local suppliers to help grow the local economy.

Page 16

Section 5:  Strategic Aims, Strategic 
Objectives, Key Priorities & Action Plan Page 14 of 53 Back to Contents 
o Increased engagement and collaboration with suppliers and the SDP.
o To develop resilient local supply chains, providing clear advice and consistent
approaches to procurement and community benefits, ensuring businesses
are aware of, and are able to take advantage of, procurement opportunities
supported by a programme of active and innovative supplier engagement and
development support.
o To increase the knowledge and understanding of the benefits of sustainable
procurement of all council staff who participate in the procurement process
and make better use of the expertise within the council to ensure wider
sustainable outcomes are achieved. 
How we will do it
➢ We will analyse the supply chain in Argyll and Bute to identify specific areas
of strength and opportunities to develop specific sectors, and work closely
with the SDP to deliver effective supplier engagement to include online advice
and guidance and targeted events relating to specific tenders to improve the
capability of local businesses to bid for contracts.
➢ Optimisation of community benefits via contractual community benefits and
the community wish-list - explore how procurement can support community
wishes and priorities such as poverty reduction and improve equality. 
➢ Continue to support the national meet the buyer event and to hold, at least
annually, one council meet the buyer session and relevant tender talk session
in conjunction with the SDP. 
➢ Provide support to wider council teams with their sustainability and net-zero
targets as required; including updating templates to meet the changing needs
of the council and the Scottish Government, and adapting procurement
processes to support these targets whilst still complying with Procurement
Regulations. 
What will the outcome be?
▪ Increased opportunities for local businesses, co-operatives, Supported
Businesses and Third Sector organisations.
▪ To secure wider social, economic and environmental benefits for the local
area and ensure those benefits are realised.
▪ We will have supported small local businesses to access existing supply
chains and increased their capability to successfully bid for contracts.
▪ Greater outcomes achieved for local communities.
▪ Community wish-list being delivered by contracted suppliers.

Page 17

Section 5:  Strategic Aims, Strategic 
Objectives, Key Priorities & Action Plan Page 15 of 53 Back to Contents 
5.2.4 Provide Effective and Efficient Procurement for our Stakeholders 
Aims
o Continue to deliver best value contracts.
o More streamlined and leaner processes. 
How will we do it
➢ Review P2P processes and roles in conjunction with service areas. 
➢ Engage with suppliers and stakeholders to identify how we can improve and
streamline our processes and inform mobilisation and exit plans.
➢ Form closer working relationships with Scotland Excel, other local authorities,
and our local Community Wealth Building Partners to benchmark processes
and procedures.
➢ Streamline and standardise processes and documentation. 
➢ Undertake a wider legal review of the council’s terms and conditions to make
the contract more flexible and appealing to suppliers/ contractors, reflecting
volatile markets whilst mitigating the opportunity of risk for the council (e.g.
insurance levels, price variations). 
What will the outcome be? 
▪ Meet the council’s strategic needs. 
▪ Seen as a Strategic Partner for council services. 
▪ Increased opportunities for suppliers by streamlining the process. 
5.2.5 Procurement to be a Strategic Partner for all our Council Services 
Aims
o Procurement continues to be a key strand in the delivery of council strategies
and policies. 
o Build capacity and skills within the council to improve procurement,
commissioning and contract management activity and support procurement
people of tomorrow.
o Cross-service collaboration.

Page 18

Section 5:  Strategic Aims, Strategic 
Objectives, Key Priorities & Action Plan Page 16 of 53 Back to Contents 
How we will do it
➢ Promote and create a better understanding of the procurement process and
procedures across the council.
➢ Look to develop interactive methods of sharing data such as the contract
register, contract plans and category workload tracker with customer service
teams.
➢ Engage with HR colleagues to consider how we can promote procurement/
commissioning and contract management at career events with a view to
grow our own professionals and succession planning.
➢ Increase understanding on what can be delivered under partnerships/grant
funding and what is governed by the procurement rules.
➢ Continue to support the delivery of council strategy and policies, service
teams to engage with procurement to ensure procurement actions are
achievable within the scope of their project/requirement.
➢ Identify opportunities for joint procurement. Actively engage all services,
including Education, Health & Social Care Partnership (HSCP), in strategic
procurement planning. 
What will the outcomes be?
▪ A better understanding and knowledge of procurement and contract
management, including risk, throughout the council.
▪ Training and awareness sessions on sustainable procurement.
▪ Increased awareness of public sector procurement with young people at
school career events.
▪ Procurement involved at strategic business case stage.
▪ Develop PCCMT operating model to implement “one council” approach to
procurement spend. 
5.3 Supplier Opportunities 
We are pleased to hear from new and existing suppliers who are interested in
tendering for business. Any enquiries can be sent to the corporate procurement
inbox procurement@argyll-bute.govuk. 
The PCCMT has developed a supplier page on the council’s website with useful
tips and information as to how to bid for council contracts. 
In addition, the council’s current contract register is available on the council
website and gives visibility of current contracts and the corresponding end dates.

Page 19

Section 5:  Strategic Aims, Strategic 
Objectives, Key Priorities & Action Plan Page 17 of 53 Back to Contents 
Any contracts requiring renewal, as well as any new requirements, will be
advertised and tendered via the following e-tendering portals:
o Public Contracts Scotland Tender (PCS-T)
Regulated Procurement (Goods/Services >£50,000, Works >£2 million) 
o Public Contracts Scotland (PCS)
Quick Quotes (Goods/Services <£50,000, Works <£2 million) 
All Quick Quotes undertaken by the council will include an invitation to at least
one SME and, if the market allows, at least one local supplier.
Any company interested in bidding for business with the council must be
registered with Public Contracts Scotland (PCS) and be in a position to submit
their responses using these portals. 
The strategy objectives and the targeted outcomes will be monitored via an action
plan detailed as follows:

Page 20

Section 5:  Strategic Aims, Strategic Objectives,    
Key Priorities & Action Plan Page 18 of 53 Back to Contents
Procurement Strategy Action Plan 
5.4.1 Good Governance 
Objectives Aims & Outcomes Performance
Indicators Actions Target
Date Owner 
Aim:
o To ensure all procurement staff and council officers
involved in the procurement process are fully aware of all
aspects and impacts of the procurement rules and any
other relevant regulations. 
Outcome:
▪ Mitigation of the opportunities for procurement challenge. 
▪ Procurement activity will comply with all relevant statutory
and regulatory requirements. 
▪ Procurement staff are confident in their understanding of
procurement regulations and other relevant regulations. 
No legal
challenge 
➢ Mandatory training for council officers involved in the
procurement process (project leads, specification writers)
including highlighting the requirement for project/ contract
management, excellent communication skills, varying contracts,
budget variances and social benefits that procurement must
consider (for example, Equality and Fair Work First Practices). 
➢ Ongoing training for procurement staff on changes to legislation
and regulations. 
➢ Adapt our internal procedures, processes and documentation,
where required, to reflect any new legislative requirements. 
Ongoing 
Ongoing 
Ongoing 
SMT 
PCCMT
Manager 
PCCMT
Manager

Page 21

Section 5:  Strategic Aims, Strategic Objectives,    
Key Priorities & Action Plan Page 19 of 53 Back to Contents
Procurement Strategy Action Plan 
5.4.2 Value for Money to Support Council’s Financial Challenges
Objectives Aims & Outcomes Performance
Indicators Actions Target
Date Owner 
Aim:
o Increase opportunities for commercial savings. 
o Reduce the value of non-contract spend.
Outcome:
▪ Assisting the council to meet budget savings targets.
▪ Increase contracted spend.
▪ Improved Contract and Demand Management. 
Savings for
budget holders. 
Reduced
expenditure. 
➢ Continue to target savings and procurement benefits from all
aspects of the strategic procurement process (tender, contract and
demand management, P2P).
➢ We will continue to develop our contract management framework
as we understand that successful contracts depend on good
contract management and good contract management depends
on good supplier relations. 
➢ Further embed and improve demand management within the
contract management process.
➢ Ensure that suppliers provide regular management information
on our usage of their contracts and incorporate this information
into the contract management process. 
➢ To work closer with our client departments to understand their
needs, identify opportunities to reduce expenditure, control
demand and improve process efficiencies. 
➢ Continue to look for opportunities to collaborate in procurement
with our public sector partners and benchmark to ensure that
collaborations provide best value. 
Ongoing 
Ongoing 
Ongoing 
Ongoing 
Ongoing 
Ongoing 
PCCMT 
PCCMT 
PCCMT 
PCCMT/
SMT 
PCCMT 
PCCMT

Page 22

Section 5:  Strategic Aims, Strategic Objectives,    
Key Priorities & Action Plan Page 20 of 53 Back to Contents
Procurement Strategy Action Plan 
5.4.3 Empowering Local Suppliers, Supporting Community Wealth Building and Local Economic Growth 
Objectives Aims & Outcomes Performance Indicators Actions Target
Date Owner
Aim:
o To secure wider social, economic and environmental benefits for
the local area and ensure those benefits are realised. 
o Increased opportunities for local suppliers to help grow the local
economy. 
o Increased engagement and collaboration with suppliers and SDP.
o To develop resilient local supply chains, providing clear advice and
consistent approaches to procurement and community benefits,
ensuring businesses are aware of, and are able to take advantage
of, procurement opportunities supported by a programme of active
and innovative supplier engagement and development support.
o To increase the knowledge and understanding of the benefits of
sustainable procurement of all council staff who participate in the
procurement process and make better use of the expertise within
the council to ensure wider sustainable outcomes are achieved.
Outcome:
▪ Increased opportunities for local businesses, co-operatives,
Supported Businesses and Third Sector organisations.
▪ To secure wider social, economic and environmental benefits for
the local area and ensure those benefits are realised.
▪ We will have supported small local businesses to access existing
supply chains and increased their capability to successfully bid for
contracts.
▪ Greater outcomes achieved for local communities.
▪ Community wish-list being delivered by contracted suppliers. 
Procurement spend with
contracted suppliers (%) 
Contract awarded to local
suppliers (%) 
Contracts awarded to SMEs
(% of contracts awarded) 
Local suppliers bidding for
business with the council (%
of bids received)  
Tenders won by a local
supplier where a local
supplier has placed a bid (%) 
Increase the number of
community benefits that are
delivered through contracts
we award locally. 
➢ We will analyse the supply chain in Argyll
and Bute to identify specific areas of
strength and opportunities to develop
specific sectors, and work closely with the
SDP to deliver effective supplier
engagement and improve the capability of
local businesses to bid for contracts.
➢ Optimisation of community benefits via
contractual community benefits and the
community wish-list - explore how
procurement can support community
wishes and priorities such as poverty
reduction and improve equality. 
➢ Continue to support the national meet the
buyer event and to hold, at least annually,
one council meet the buyer session and
relevant tender talk session in
conjunction with the SDP. 
➢ Provide support to wider council teams
with their sustainability and net-zero
targets as required; including updating
templates to meet the changing needs of
the council and the Scottish Government,
and adapting procurement processes to
support these targets whilst still
complying with Procurement Regulations. 
Ongoing 
Ongoing 
Ongoing 
Ongoing 
PCCMT 
PCCMT 
PCCMT 
PCCMT

Page 23

Section 5:  Strategic Aims, Strategic Objectives,    
Key Priorities & Action Plan Page 21 of 53 Back to Contents
Procurement Strategy Action Plan 
5.4.4 Provide Effective and Efficient Procurement for our Stakeholders
Objectives Aims & Outcomes Performance
Indicators Actions Target
Date Owner
Aim:
o Continue to deliver best value contracts. 
o More streamlined and leaner processes. 
Outcome:
▪ Meet the council’s strategic needs.
▪ Seen as a Strategic Partner for council services.
▪ Increased opportunities for suppliers by streamlining the process. 
➢ Review P2P processes and roles in conjunction with service
areas. 
➢ Engage with suppliers and stakeholders to identify how we
can improve and streamline our processes and inform
mobilisation and exit plans.
➢ Form closer working relationships with Scotland Excel, other
local authorities, and our local Community Wealth Building
Partners to benchmark processes and procedures.
➢ Streamline and standardise processes and documentation. 
➢ Undertake a wider Legal review of the council’s terms and
conditions to make the contract more flexible and appealing
to suppliers/ contractors, reflecting volatile markets whilst
mitigating the opportunity of risk for the council (e.g.
insurance levels, price variations). 
Ongoing 
Ongoing 
Ongoing 
Ongoing 
Ongoing 
PCCMT 
PCCMT 
PCCMT 
PCCMT 
PCCMT

Page 24

Section 5:  Strategic Aims, Strategic Objectives,    
Key Priorities & Action Plan Page 22 of 53 Back to Contents
Procurement Strategy Action Plan 
5.4.5 Procurement to be a Strategic Partner for all our Council Services
Objectives Aims & Outcomes Performance
Indicators Actions Target
Date Owner
Aim:
o Procurement continues to be a key strand in the delivery of council
strategies and policies.
o Build capacity and skills within the council to improve procurement,
commissioning and contract management activity and support
procurement people of tomorrow.
o Cross-service collaboration. 
Outcome:
▪ A better understanding and knowledge of procurement and
contract management, including risk, throughout the council.
▪ Training and awareness sessions on sustainable procurement.
▪ Increased awareness of public sector procurement with young
people at school career events.
▪ Procurement involved at strategic business case stage.
▪ Develop PCCMT operating model to implement “one council”
approach to procurement spend. 
➢ Promote and create a better understanding of the
procurement process and procedures across the council.
➢ Look to develop interactive methods of sharing data such
as the contract register, contract plans and category
workload tracker with customer service teams.
➢ Engage with HR colleagues to consider how we can
promote procurement/commissioning and contract
management at career events with a view to grow our own
professionals and succession planning.
➢ Increase understanding on what can be delivered under
partnerships/grant funding and what is governed by the
procurement rules.
➢ Continue to support the delivery of council strategy and
policies, service teams to engage with procurement to
ensure procurement actions are achievable within the
scope of their project/requirement.
➢ Identify opportunities for joint procurement. Actively
engage all services, including Education, Health & Social
Care Partnership (HSCP), in strategic procurement
planning. 
Ongoing 
Ongoing 
Ongoing 
Ongoing 
Ongoing 
Ongoing 
PCCMT 
PCCMT 
PCCMT 
PCCMT 
PCCMT 
PCCMT

Page 25

Section 5:  Strategic Aims, Strategic Objectives,    
Key Priorities & Action Plan Page 23 of 53 Back to Contents
Procurement Strategy Action Plan 
5.5 Mandatory Requirements of the Procurement Reform (Scotland) Act 2014 and Statutory Guidance Obligations. 
The Act lays out some mandatory requirements which the procurement strategy must include. In particular: 
5.5.1 Good Governance
Key
Priorities
How the organisation intends to make sure that its regulated
procurements will:  Council Response/Strategy Content
1 Be undertaken in compliance with its duty to act in a transparent and
proportionate manner   
o  A The council’s Standing Orders relating to contracts and procurements apply to all
contracts made by or on behalf of the council for the delivery of works, the supply of
goods and materials and the provision of services.
o All procurement activity undertaken must comply with the above process and
procedures which secures compliance with the Act and Statutory Guidance.
In addition to the above, the council engages fully with the Supplier Development
Programme (SDP), to understand their organisational needs and share the council’s
procurement work plan. 
o  B PINs will be published on Public Contracts Scotland (PCS) for all appropriate regulated
procurements in 2025/28. 
o  C Consideration will be given within the initial Commodity Sourcing Strategy (CSS) to
lotting all regulated contracts in 2025/28. 
o  D We will offer alternative language formats when requested.
2 o Payment of a living wage - to persons involved in producing, providing
or constructing the subject matter of regulated procurements   
o  A Consideration will be given at the initial stages of individual regulated procurements to
whether it is relevant to address living wage and fair work practices. 
o  B Payment of the living wage will be monitored by contract management activity in
relevant regulated contracts.

Page 26

Section 5:  Strategic Aims, Strategic Objectives,    
Key Priorities & Action Plan Page 24 of 53 Back to Contents
Procurement Strategy Action Plan 
5.5.1 Good Governance
Key
Priorities
How the organisation intends to make sure that its regulated
procurements will:  Council Response/Strategy Content
3 The use of community benefit requirements    
A Community Benefits Clauses will be included in regulated procurements as outlined in
the Sustainable Procurement Strategy 2025/28.  
B Report on the methodology of delivering community benefits that have been requested
by our local communities.
4 Promoting compliance with health and safety at work, including how
a supplier/ sub-contractor demonstrates compliance.    
A Health and Safety considerations will be included at all stages of regulated procurement
processes in 2025/28.  
B All regulated works procurements in 2025/28 will include reference to the current CDM
(Construction (Design and Management)) Regulations.
5 Complying with the council’s Sustainable Procurement Strategy in
relation to the procurement of fairly and ethically traded goods and
services.    
A The procurement of fairly and ethically traded goods and services will be considered
within the CSS of all regulated procurements in 2025/28.

Page 27

Section 5:  Strategic Aims, Strategic Objectives,    
Key Priorities & Action Plan Page 25 of 53 Back to Contents
Procurement Strategy Action Plan 
5.5.1 Good Governance
Key
Priorities
How the organisation intends to make sure that its
regulated procurements will:  Council Response/Strategy Content
6 Food procurement   
o  A Any regulated catering contracts carried out in 2025/28 will consider the following national
guidance throughout the procurement process:  ‘Better Eating, Better Learning’; ‘Beyond the School
Gate’; ‘Soil Association Food for Life Catering Mark’; ‘Catering for Change: Buying Food Sustainably
in the Public Sector’; and ‘Becoming a Good Food Nation’. 
The council will continue to look for opportunities to include local and sustainable food wherever
possible in schools, facilities, venues and to meet social care requirements.
o The council is committed to including health and wellbeing and animal welfare procurement
requirements that promote the health, wellbeing and education of communities.
Procurement requirements relating to food procurement focus on nutritional quality, health and
wellbeing, minimising environmental impact such as packaging and sourcing, as well as the
application of appropriate animal welfare standards in accordance with all relevant legislation.
The council will ensure that procurement requirements relating to Fairly and Ethically Traded Goods
and Services are applied in a relevant, proportionate and legally compliant manner.
7 Comply with the sustainable procurement duty.    
A Staff involved in the procurement process understand and positively contribute to achieving
sustainable outcomes.
The council is reassured that suppliers adhere to the principles of a Fair Work First Practice
organisation.  
B Inclusion of a mandatory sub-contracting clause in regulated procurements where relevant and
proportionate.  
C Promote sub-contracting opportunities to SMEs through promoting the use of PCS on the Council’s
website.

Page 28

Section 5:  Strategic Aims, Strategic Objectives,    
Key Priorities & Action Plan Page 26 of 53 Back to Contents
Procurement Strategy Action Plan 
5.5.1 Good Governance
Key
Priorities
How the organisation intends to make sure that its
regulated procurements will:  Council Response/Strategy Content
7/contd Comply with the sustainable procurement duty    
D Share knowledge and participate in events aimed specifically at local SMEs and third sector bodies,
and Scottish suppliers, for example, by publicising Supplier Development Programme events and
providing assistance with the tender process through Business Gateway.  
E Review existing method of engaging with local supply base and engage with Communications Team
and Business Gateway to target a wider audience of potential new suppliers, with the aim of
increasing the number of new suppliers on our quick quote distribution list.  
F The Procurement, Commercial and Contract Management Team will provide support to the wider
council in relation to emissions management within council contracts.  Procurement activities
directly influence the council’s Scope 3 emissions through our supply chains, which will be
monitored and measured in line with Scottish Government requirements.

Page 29

Section 5:  Strategic Aims, Strategic Objectives,    
Key Priorities & Action Plan Page 27 of 53 Back to Contents
Procurement Strategy Action Plan 
5.5.2 Value for Money to Support Council’s Financial Challenges
Key
Priorities
How the organisation intends to make sure that its
regulated procurements will:  Council Response/Strategy Content
8 Deliver value for money    
A The successful delivery of this strategy.
o The application of procurement best practice and undertaking key strategic procurement
activities.
o Early market engagement. 
o By including appropriate lots to promote SME/Third Sector and local supplier participation. 
o Maximising the impact of each pound spent by including Community Benefit Clauses.
o Evaluating on the most economic and advantageous criteria.
o Utilisation of output specifications. 
o Challenging the need and demand management.
o Robust contract management.
o Application of effective commercial evaluation models. 
9 Contribute to the carrying out of its functions and the
achievement of its purposes.    
A The delivery of this strategy will ensure procurement is delivered in a compliant, effective and
efficient manner, provide a clear action plan for improvement and contribute to wider council
objectives and priorities.
By making sure there is early engagement and clear communication channels between the service
departments and procurement will assist in achieving best value.
This strategy will be monitored and reported as per the Monitoring, Reviewing and Reporting on the
Strategy section of this strategy document, to make sure the key objectives are delivered and best
value is secured.

Page 30

Section 5:  Strategic Aims, Strategic Objectives,    
Key Priorities & Action Plan Page 28 of 53 Back to Contents
Procurement Strategy Action Plan 
5.5.3 Empowering Local Suppliers, Supporting Community Wealth Building and Local Economic Growth
Key
Priorities
How the organisation intends to make sure that its
regulated procurements will:  Council Response/Strategy Content
10 The provision of prompt payment – no later than 30 days after
invoice by the organisation to a supplier and/or sub-contractor, or
by a sub-contractor to a sub-contractor.    
A We will aim to meet the target of 95.5% per quarter of invoices paid within 30 days during
2025/28.  
B Prompt payment clauses requiring a 30 day payment term are embedded within our
contractual terms and conditions. Suppliers are required to apply the same terms and
conditions with their sub-contractors who are delivering and supporting the council
contract.
11 Consulting and engaging with those affected by its procurements.    
A Consultations with relevant stakeholder groups will be carried out at the CSS stage of
regulated procurements in 2025/28, where relevant and proportionate. 
5.6 Key Performance Indicators by which we will measure the success of the Action Plan are detailed in Section 7.   
5.7 The council’s current Contract Plan can be found here.

Page 31

Section 6:   
Procurement Strategy by Category Page 29 of 53 Back to Contents 
CORPORATE & EDUCATION 
Scope/Key Spend Areas 
The Corporate & Education category consists of the following areas:  
➢ Education
➢ Corporate 
➢ Information and Communications Technology (ICT)
➢ HR/Training 
➢ Transport (including Bus, Air, Boats & Fleet)
➢ Catering & Cleaning
➢ Economic Development
➢ Travel & Accommodation
➢ Leisure & Sports 
Within Corporate & Education, our overall strategy is to work with all relevant services to
review existing contracts or identify new needs and schedule procurement exercises as
needed.  In doing this, we determine the most appropriate procurement route for the
requirement and engage the market as early as possible dependant on the procurement
route selected. 
2025/28 Strategy 
Analysis of the existing spend profile (financial year 2023/24) across the Corporate &
Education Category has identified the volume of uncontracted suppliers as a priority
areas of focus.  The analysis breaks down as follows: 
2023/24
Spend Type Number of
Transactions
Total value
(£)
Number of
suppliers
Average
transaction
value (£)
Total
Percentage
Contracted  24629 £48.4m 211 £1,965.51 91.13%
Uncontracted  4414 £4.7m 386 £1,068.04 8.87% 
Where resources allow, a combination of the following actions will be in our strategy to
address this:
• To continue to support all services to source and purchase goods and services from
national and CAT C contracts where possible.  
• To continue to increase the remit of the Transactional Purchasing Team (TPT) and
grow the team’s procurement knowledge and skills to aid services in ensuring best
value is achieved for all low value spend.    
Section 6 – Procurement Strategy by Category

Page 32

Section 6:   
Procurement Strategy by Category Page 30 of 53 Back to Contents 
• To continuously review the eProcurement System (PECOS) to ensure catalogues
and suppliers are up to date and available for use by both the TPT and service end
users.  
• Continue to review the system setup of PECOS, test new functionality as it becomes
available/resource allows and implement to improve user experience where possible. 
• To continue to work with all services to implement the No PO No Payment; eventually
resulting in the stopping of all relevant manual batched payments and providing the
PCCMT access to line item detail of all supplier spend.
• Continue to support Education Services with all procurement activity via the
Education Purchasing Team to increase Education’s volume of spend under contract.     
Short/Medium Term Strategy 
The short-term strategy for the procurement of goods and services within Corporate &
Education over the next 2-3 years is:
o Transactional Purchasing Team (TPT):  Continue to increase the volume of low
value uncontacted spend directed to the TPT for sourcing.  Increase volume of
Invitation to Quotes (ITQs) processed and awarded via TPT to confirm best value is
being achieved. 
o National Contracts:  As new national contracts become available, assess suitability
and carry out Best Value review.  If deemed appropriate, roll out to relevant users
and on PECOS.
o PECOS: Promote the use of CAT C and collaborative contracts to achieve best value. 
o Contract Management:  Continue to undertake contract and supplier management
meetings with key suppliers.
o Catering Contracts:  Continue to assess the suitability of Scotland Excel frameworks
in order to ensure best value is achieved, work proactively to identify and support
local food and drink suppliers to bid for contracts, and explore opportunities to
introduce dynamic procurement opportunities for food and drink where appropriate.
o Cleaning Contracts:  Continue to utilise Scotland Excel frameworks in order to
achieve best value and process efficiently.
o ICT:  Continue to use available frameworks or tender as required.  
o Corporate:  Continue to utilise Scotland Excel and Scottish Procurement frameworks
in order to achieve best value and process efficiently.  Continue to work with the
services to implement CAT C contracts as appropriate.    
Corporate & Education

Page 33

Section 6:   
Procurement Strategy by Category Page 31 of 53 Back to Contents 
o HR Contracts and Training:  Continue working with the service to consider ways of
improving and streamlining the central delivery with maximum use of training
contracts and frameworks.  Work with HR to utilise available frameworks as far as
possible. 
o Transport:  Continue to provide procurement support to the School and Public
Transport and Strategic Transport Teams.  Where possible, encourage and support
transport operators to explore more sustainable modes of transport including electric
vehicles and the use of alternative fuels.    
o Live Argyll:  Continue to provide procurement services as required.
o Education:  Increase spend under contract, ensure competitive processes are
undertaken where needed, and direct appropriate spend to national or collaborative
contracts where appropriate.  
o Fair Work First:  Ensure the inclusion of Fair Work First questions covering the five
criteria’s for all regulated tenders.
o Sustainability: Ensure Sustainability and Community Wealth Building are
considered at the sourcing strategy stage for all regulated tenders. 
Longer Term Strategy 
The longer term strategy for the procurement of goods and services within Corporate &
Education over the next 3-5 years includes: 
o Collaboration:  Greater engagement with potential partnerships with consideration
to more collaborative procurement working, shared services and outsourcing
opportunities.
o Catering and Cleaning:  Provide procurement support for Catering and Cleaning
development projects.  Ensure all procurement practices support the requirements
laid out in the current Programme for Government, including forthcoming
requirements expected as part of the Good Food Nation bill, the Community Wealth-
building bill and the extension of universal free school meals.  Explore opportunities
for increasing the provision of organic or agro ecologically sourced food and drink
across all food and drink contracts.
o ICT:  Explore all available national collaborative contract opportunities. 
o Corporate:  Develop an overarching Corporate Category Strategy.  
o Transport:  Annually review the Passenger Transport Category Strategy.  Expand
the contract and supplier management process.   
Corporate & Education

Page 34

Section 6:   
Procurement Strategy by Category Page 32 of 53 Back to Contents 
CONSTRUCTION & ENVIRONMENT 
Scope/Key Spend Areas 
The Construction & Environment category consists of the following areas: 
➢ Construction Consultancy
➢ Construction Supplies
➢ Building Works & Services
➢ Infrastructure Works & Services
➢ Environment
➢ Marine Transport 
An analysis of the existing spend profile within the Construction & Environment Category
has identified a number of priority areas of focus.  These key areas include:
• Major Projects – Procurement and contract management support will be provided to
ongoing and upcoming projects, including the Rothesay Pavilion Regeneration
project, Kilmory Business Park and Roads Depots Replacement (Lochgilphead, Islay
and Dunoon).
• Statutory Maintenance Contracts – Providing procurement support for upcoming term
contract and framework requirements.
• Rural Growth Deal (construction and infrastructure related themes) – Providing
procurement support for both internal procurements and procurements undertaken
on behalf of external organisations. 
Short/Medium Term Strategy 
The short term strategy for the procurement of works, goods and services within
Construction & Environment over the next 2-3 years is:
o Continue to provide support in the achievement of the council’s capital programmes.
o Continue to put in place framework agreements to cover core areas of spend across
the council.
o Continue to provide procurement support as required for emergency responses i.e.
due to extreme weather situations.  This will include putting in place frameworks and
processes to be followed in these circumstances to streamline appointments while
complying with the procurement regulations.
o Procurement support will be provided for a Residual Waste procurement to comply
with the end of 2025 municipal waste landfill requirements; we anticipate working with
West Dunbartonshire Council on a joint procurement exercise for this. 
Construction & Environment

Page 35

Section 6:   
Procurement Strategy by Category Page 33 of 53 Back to Contents 
o Continue to ensure adequate resource to support Major Projects and Rural Growth
Deal programme procurements.
o Provide procurement support to Property Services to introduce a new General
Maintenance Term Contract.
o Continuation of a pilot to increase the threshold for Property Services to carry out
their own Quick Quotes via PCS (up to £5,000 for Consultancy Services and £10,000
for Works).
o Introduce a Building Consultancy Services Dynamic Purchasing System to further
support SMEs and local contractors in accessing opportunities.
o Statutory Maintenance Term Contracts:  The PCCMT will work with Property Services
to introduce new Term Contracts to cover the council’s statutory requirements in
relation to compliance inspection and testing of building services in council facilities. 
This will be an ongoing process with separate unique contracts and specialist
suppliers involved. Collaborative frameworks will be utilised where possible.
o Provide procurement support to Commercial Services in relation to the delivery of the
new 2-18 campus on Mull.
o Provide procurement and contract management support for Economic Growth
outcomes. 
Longer Term Strategy 
The longer term strategy for the procurement of works, goods and services within
Construction & Environment over the next 3-5 years includes: 
o With regards to Waste Management, changes in legislation will bring new
requirements for the council (could also include requirements relating to Waste PPP
(Public Private Partnership) contract handback in 2026) to be confirmed by the
service.
o Provide procurement support to assist the Property Services team with increasing
levels of contracted statutory maintenance spend from the current levels.
o Provide continuing procurement and contract management support to the Rural
Growth Deal programme over the full 10 year period. 
Construction & Environment

Page 36

Section 6:   
Procurement Strategy by Category Page 34 of 53 Back to Contents 
CARE, EARLY YEARS & HOUSING 
Scope/Key Spend Areas 
The Care, Early Years & Housing category consists of the following areas: 
➢ Adult Services
➢ Children’s Services
➢ Homelessness Services
➢ Early Years 
➢ Aids and Adaptations 
An analysis of the existing spend profile within the Care, Early Years & Housing category
has identified key areas of focus.   
The highest spend comes from the Health and Social Care Partnership (HSCP).  The
Integration Joint Board’s (IJBs) Joint Strategic Commissioning Strategy (JSCS) informs
the procurement priorities for the HSCP and anticipates the priorities of a National Care
Service. 
Following consultation, the IJB have agreed the following priorities: 
- Choice and control & innovation 
- Prevention, early intervention and enablement 
- Living well and active citizenship 
- Community co-production 
In addition to this, key market messages have been published as follows: 
• A shift to digital technology and increased use in telecare and telehealth. 
• A move to different models of care at home and support services. 
• Hospital avoidance and prevention. 
• Support to unpaid carers. 
• Promotion of health enabling and community co-production. 
• Sustainability of workforce skills within key sectors of Argyll and Bute. 
• Self-directed support.
• Engagement with our communities. 
• Accessing transport.   
In addressing these priorities the function of procurement and commissioning may look
different.  We anticipate a greater focus on equal partnership, community involvement
(including supported people) and use of models that support co-production.  
Care, Early Years & Housing

Page 37

Section 6:   
Procurement Strategy by Category Page 35 of 53 Back to Contents 
While we can’t predict what new services will look like, we can expect that the following
will be key areas of focus:   
Argyll and Bute HSCP 
➢ Care at Home and Supported Living Services
A local contract for Care at Home Services to older people is in place to 3rd November
2026.  During the term of this contract, the HSCP will continue to develop its strategic
direction for Care at Home Services in line with local and national priorities.   
The HSCP is currently planning for the future of its Supported Living Contract for
adults who have a learning disability and for those that require mental health support.  
A procurement process is expected to commence in 2025/26.   
➢ Responder Services 
The current contract for Responder Services ends March 2025. The future
procurement of this service will be informed by the JSCS and the individual service
strategies that have a focus on Technology Enabled Care (TEC), Adults and Older
People. 
➢ Older People’s Care Homes 
Work continues by Scotland Excel at a national level on the development of a new
National Care Home Contract and it is our intention to continue using this.  However,
we must be aware of the continuing risk that negotiations will fail.  In that instance,
Argyll and Bute HSCP would require locally negotiated contracts and/or collaborative
arrangements with other partnerships. 
➢ Adult and Children/Young People’s Residential Placements (outside Argyll and
Bute) 
The HSCP is continuing to work towards keeping more young people in Argyll and
Bute. This may result in some related procurement activity in the term of this Strategy.
➢ Children’s Support Services 
Contracts for support in some areas of Argyll and Bute will come to an end on 31st
March 2025.  Any future procurement of these services will be aligned with the vision
and priorities of the Children and Young People’s Service Plan 2023-2026. 
➢ Community Based Substance Use Recovery Contract 
The current contract ends on 31st March 2025.  A new contract will be developed that
takes account of updates to local and national priorities, including the Argyll & Bute
Alcohol and Drug Partnership’s (ADP) Alcohol and Drug Strategy and Action Plan
2020–2023 and any future iterations.   
Care, Early Years & Housing

Page 38

Section 6:   
Procurement Strategy by Category Page 36 of 53 Back to Contents 
➢ Early Learning and Childcare Services
Contracts are in place to August 2025 for the Scottish Government’s policy of
delivering 1140 hours of funded childcare to eligible children.  In the term of this
strategy, work will commence on the development of a new contract with a focus on
maintaining sustainable provision and payment of a rate that reflects national policy
priorities and enables payment of the real Living Wage to all workers delivering the
funded requirement.
➢ Housing Support and Homelessness   
Contracts are in place for Tenancy Support Services and Serviced Accommodation
for people that are homeless or identified as being at risk of homelessness to 2025.   
In the term of this strategy, work will commence on the development of new contracts.     
Short/Medium Term Strategy 
The short term strategy for the procurement of goods and services within the Care, Early
Years & Housing Category over the next 2-3 years is:
o PCCMT will be involved in the strategic planning work underway for Adult Services,
in particular, for those areas that will influence the development of the Care at Home
and Supported Living Service contracts.  
o As stated above, Responder Services contract will come to an end March 2025. 
Work will therefore commence shortly on the planning/development of a procurement
process for future service provision. 
o The development of a new contract for a Community Based Substance Use Recovery
Service is expected to take place to secure services from March 2025, when the
current contract ends. 
o The development of a new contract for Supported Living Services is expected to be
developed in the term of this strategy. 
o A sourcing strategy will be developed for future procurement of dementia services,
including post diagnostic support. 
General Activity:
• Continue involvement in the implementation of the JSCS and related work streams. 
This work will likely prompt reviews of specific service areas, and result in
procurement process and/or redesign of contracted services. 
Care, Early Years & Housing

Page 39

Section 6:   
Procurement Strategy by Category Page 37 of 53 Back to Contents 
• To comply with the Guidance on the Procurement of Care and Support Services 2016
(Best Practice), making use of the provisions of the Light Touch Regime (LTR), where
appropriate, under the Public Contract (Scotland) Regulations 2015.  The LTR allows
consideration of wider factors when sourcing Health, Social Care and Education
services and legitimises their influence in decision making.  These wider factors allow
procurement activity to take account of the strategic vision of the HSCP, for example,
in relation to sustainability; improved outcomes; continuity; choice and affordability.  
• To procure in a way that is in line with and sensitive to the expected national direction
from the Scottish Government, the Feeley Review and the forthcoming National Care
Service.  
• While we await more information on the implementation of the National Care Service,
we will continue to support customers in making best use of the procurement options
available, ensuring that sourcing strategies balance the desire for longer term
contracts; partnership working and co-production with procurement related risks.
• To ensure that Fair Work First criteria is implemented in all procurements and
reflected in Contract Management activity in line with the guidance in SPPN 6/2021.
• Sustainability:  Ensure Sustainability and Community Wealth Building are considered
at the sourcing strategy stage for all regulated tenders.
• To continue to undertake contract and supplier management activity with key
suppliers.
• To improve communication with customers by developing and promoting guidance
and reports in relation to procurement and contract management activity.  
• To continue to review the terms and conditions for care services.
• To work with colleagues in the HSCP to ensure that contracts are in place to
maximise the Self-Directed Support (SDS) options as far as possible and to support
the HSCP in balancing the risks of choice and control against best value (including
procurement regulations). 
• To ensure that suppliers providing services to vulnerable clients manage their health
and safety risks appropriately.  This will be achieved via proportionate and relevant
checks pre-contract award and as part of contract management.
• To continue to work with customers and involve and guide them in the Contract and
Supplier Management process to ensure maximum benefits are realised from the
contract. 
Care, Early Years & Housing

Page 40

Section 6:   
Procurement Strategy by Category Page 38 of 53 Back to Contents 
Longer Term Strategy 
The longer-term strategy for the procurement of goods and services within the Care,
Early Years & Housing Category over the next 3-5 years includes:
o Develop and continue to review commodity sourcing strategy coverage for all high
value/high risk procurements, ensuring that these strategies compliment National
Direction and the strategic vision of customers. 
o Continue active involvement in national activity lead by Scotland Excel and other
relevant bodies.
o Continue to seek innovative solutions for compliant procurement processes for
Services to the Person, e.g. flexible frameworks.
o Continue to provide procurement support advice and assistance to the relevant
customers, in order to ensure that they are receiving best value quality services from
its suppliers, delivered safely and without unacceptable risks to health.
o Through appropriate and proportionate procurement and contract management
activity, we will contribute to the achievement of our customers’ strategic vision. 
Care, Early Years & Housing

Page 41

Section 7:   
Financial Analysis & KPIs Page 39 of 53 Back to Contents 
7.1 The council’s total procurement spend in 2023/24 on supplies, services and
works was £181.5 million, this is broken down by Category in the table below. 
Table 1: Procurement Spend by Category for 2023/24
Category  Total Spend 2023/24 
Construction & Environment  £68.75m
Care, Early Years & Housing  £59.60m
Corporate & Education  £53.12m
Total   £181.47m 
7.2   The following table shows the council’s spend in more detail by vCode Business
Sector, a classification system appended by the Scottish Procurement
Information Hub. 
Table 2: Procurement Spend by vCode Business Sector for 2023/24
vCode Business Sector  Total Spend 2023/24
Social Care & Services £52.42m
Construction £45.70m
Facilities Management £21.26m
Waste & Environmental Services £12.95m
Travel & Accommodation £7.08m
Other Goods & Services* £5.62m
Financial Services £5.52m
ICT £5.44m
Utilities & Energy £4.28m
Human Resources £4.28m
Vehicles £3.89m
Transport £2.46m
Healthcare £2.26m
Food, Beverage & Catering £1.36m
Education £1.33m
Business Support Services £1.17m
Professional Services £1.00m
Arts, Sport & Leisure £0.56m
Security Equipment & Services £0.55m
Public Sector Bodies £0.49m
Legal £0.41m
Data Not Available £0.37m
Animals & Farming £0.35m
Section 7 – Financial Analysis & KPI’s

Page 42

Section 7:   
Financial Analysis & KPIs Page 40 of 53 Back to Contents 
Table 2: Procurement Spend by vCode Business Sector for 2023/24 /contd
vCode Business Sector  Total Spend 2023/24
Manufacturing & Machinery £0.22m
Stationery & Office Products £0.14m
Marketing & Media £0.11m
Personal Care £0.10m
Mobile Communications Service Providers £0.07m
Clothing £0.03m
Retail & Wholesale £0.02m
Charitable & Religious Activity £0.02m
Laboratory £0.01m
Total  £181.47m 
7.3   The top 20 suppliers to the council account for 47.3% of the procurement spend.
The following table shows the top suppliers and spend for the year 2023/24. 
Table 3: Spend with Top 20 Suppliers in 2023/24
Supplier Name Total Spend 2023/24 
ABC Schools Ltd £17.45m
Renewi Argyll & Bute Ltd £8.85m
Dawson Wam Ltd £8.21m
Carr-Gomm Society Ltd £7.19m
Hub North Scotland Ltd £5.38m
West Coast Motor Services Co. £4.87m
Robertson Construction Eastern Ltd £4.79m
Enable £4.60m
Geo-Rope Ltd £3.34m
Hillhouse Quarry Company Ltd £2.36m
Kiely Bros Ltd £2.25m
DCF Joiners & Building Services Ltd £2.23m
MacLeod Construction Ltd £2.04m
BCA Insulation £1.98m
Key Housing Association Ltd £1.98m
Mckenzie Care Homes Ltd £1.78m
Barr Environmental Ltd £1.76m
Zurich Insurance Company £1.72m
Carers Direct Ltd £1.59m
Affinity Trust £1.49m
Total Spend with Top 20 Suppliers £85.86m

Page 43

Section 7:   
Financial Analysis & KPIs Page 41 of 53 Back to Contents 
7.4  In 2023/24, spend with SMEs accounted for 57.7% of procurement spend (where
supplier size could be determined). The chart below shows the breakdown of
spend with Small, Medium and Large companies for 2023/24.   
7.5 In 2023/24, spend with our local suppliers accounted for 35.8% of total spend. The
table below details our total procurement spend with our local suppliers over the last
four financial years. 
Table 4: Procurement Spend with our Local Suppliers
Financial
Year
Total Procurement
Spend
Total Local
Procurement Spend  %s
2022/23 £163,144,959 £60,856,127 37.3%
2021/22 £158,791,996 £47,083,238 29.6%
2020/21 £140,330,641 £45,674,534 32.6%
2019/20 £143,778,777 £41,587,083 28.9% 
Large
38%
Medium
38%
Small
19%
Unknown
5%
2023/24 - Supplier Size % of Spend

Page 44

Section 7:   
Financial Analysis & KPIs Page 42 of 53 Back to Contents 
7.6 Key Performance Indicators: 
Key Performance Indicators
Provisional
2025/28
Target
Procurement spend with contracted suppliers (%) 90%
Contracts awarded to local suppliers (%) 20%
Contracts awarded to SMEs (% of contracts awarded) 76%
Local suppliers bidding for business with the council (% of bids
received) 20%
Tenders won by a local supplier where a local supplier has placed a
bid (%) N/A
Increase the number of community benefits that are delivered
through contracts we award locally N/A
Invoices paid within 30 days (%) 95.5%

Page 45

Section 8:  Implementation,  
Reviewing & Reporting Page 43 of 53 Back to Contents 
8.1 IMPLEMENTATION 
8.1.1 Consultation  
The council will undertake relevant and proportionate consultation and
engagement as part of the preparation of this Sustainable Procurement Strategy.
This will help to ensure that our approach and strategy takes account of
stakeholders’ views and that stakeholders have the opportunity to engage and
contribute to the development of the strategy. This will allow us to gain a better
understanding of the needs of Argyll and Bute and to tailor our strategy to reflect
those needs.   
The key stakeholder groups identified for inclusion in this consultation are: 
• Argyll and Bute Council Employees
• Argyll and Bute Councillors
• MP and Local MSPs 
• Key Suppliers
• Community Planning Partners
• Other interested parties
• The general public 
The full details of our consultation are included within a report to the council’s
Procurement Board; this covers what will be involved in the consultation, and the
inclusion of feedback to the final strategy. 
8.1.2 Approval of Strategy 
The Sustainable Procurement Strategy will be approved in line with the council’s
standard process. After the consultation is complete, the draft strategy will be
finalised and sent for approval by the Departmental Management Team, the
Strategic Management Team, the Policy and Resources Committee, and Full
Council. 
8.1.3 Publication of Strategy 
The council will publish this Sustainable Procurement Strategy on our website,
and will notify Scottish Ministers of the publication of our strategy.   
8.2 REVIEWING 
The council will review this Sustainable Procurement Strategy annually. This will
help to ensure that we maintain alignment of our procurement activity with our
broader priorities and will allow us to revise our strategy where necessary. 
Section 8 – Implementation, Reviewing & Reporting

Page 46

Section 8:  Implementation,  
Reviewing & Reporting Page 44 of 53 Back to Contents 
8.3 REPORTING   
The council will, as soon as reasonably practicable following the end of the
financial year, prepare an Annual Procurement Report which will include: 
• A summary of all regulated procurements completed in the year.
• A review of whether these procurements complied with this Sustainable
Procurement Strategy.
• A statement detailing how it is intended that future compliance will be
achieved where any procurements were found not to have been carried out
in accordance with this Sustainable Procurement Strategy.
• A summary of any community benefit requirements imposed as part of a
regulated procurement that was completed during the year.
• A summary of steps taken to facilitate the involvement of supported businesses
in regulated procurements completed during the year.
• A summary of anticipated regulated procurements expected to commence in
the next two financial years.
• Anticipated future procurements. 
• Any other information as specified by the Scottish Ministers.

Page 47

Section 9:  Policies, Tools &
Procedures Page 45 of 53 Back to Contents 
National Policies: 
• Equality Act 2010
• Equality Act 2010 (Specific Duties) (Scotland) Regulations 2012 
• Organisation for Economic Co-Operation and Development  
• Procurement and Commercial Improvement Programme (PCIP) – Overview
• Procurement Journey  
• Procurement Reform Update (SPPN 1/2016)
• Public Contracts Scotland
• Public Contracts Scotland Tender 
• Scottish Model of Procurement
• Scottish Procurement Information Hub 
• Scottish Sustainable Procurement Duty 
• Workforce Matters (SPPN 1/2015) 
Local Policies:
• Community Benefits Clauses in Procurement Guide
• Corporate Plan 2023-2027
• Outcomes Improvement Plan 2024-2034
• Decarbonisation Plan 2022-2025
• Council Constitution
• Equality and Fairness 
• Health and Safety Policy 
Section 9 – Policies, Tools & Procedures

Page 48

Section 9:  Policies, Tools &
Procedures Page 46 of 53 Back to Contents 
Tools
The council has embedded various tools within its Strategic Procurement Process to
assist and ensure best value is achieved in its procurement activity.  Utilisation of the
tools also supports compliance with the Sustainable Procurement Duty.  The key tools
utilised by procurement are as follows:
• Scottish Government Procurement Journey
• Argyll and Bute Council’s Procurement Manual
• Argyll and Bute Council’s Supplementary Procurement Guidance
• Argyll and Bute Council’s procurement templates catalogue.
• Procurement Team Contract work plan
• Scottish Government Sustainable Procurement Tools
o Prioritisation Tool 
o Sustainability Test
o Flexible Framework Assessment Tool
o Life Cycle Impact Mapping 
• Contract and Supplier Management Framework Tools
o Contract Management Prioritisation Matrix
o Community Benefits online page 
Procedures
The council’s Standing Orders Relating to Contracts (Standing Orders), the Scottish
Government Procurement Journey and the council’s Corporate Procurement Manual
apply to all contracts made by or on behalf of the council for the execution of works, the
supply of goods and the provision of services. 
The Standing Orders are subject to the overriding provisions of United Kingdom and
Scottish legislation. They are also subject to any UK Government and Scottish
Government guidance on public procurement that may be issued from time to time. 
The Standing Orders shall not apply to any contracts made on behalf of the council by
Scottish Procurement, Scotland Excel or any other central purchasing body with whom
the council has made arrangements for the award of works, supplies or services
contracts on its behalf, save in respect of the reporting requirements prescribed in.

Page 49

Section 9:  Policies, Tools &
Procedures Page 47 of 53 Back to Contents 
The council operates its service delivery programme against a defined set of policies and
strategies. 
As well as conforming to legislative aspects, the council maintains awareness of and an
input into the broader aspects of policy making in public services and community
development - often working in partnership with Government, other public bodies and the
private sector. 
The majority of procurement activities will continue to support and promote relevant
council strategies and policies of which the majority are embedded within existing
procurement processes and procedures. Current key strategies, policies and procedures
are set out in Plans and Policy | Argyll and Bute Council (argyll-bute.gov.uk).

Page 50

Section 10:  Glossary Page 48 of 53 Back to Contents 
Term Description
Annual Procurement
Report
The Procurement Reform (Scotland) Act 2014 requires all
contracting authorities obliged to publish a Procurement Strategy,
to publish an Annual Procurement Report on its regulated
procurement activities as soon as reasonably practicable after the
end of its financial year.
Award  A decision to accept a tenderer’s offer to supply/provide specified
goods/services/works according to agreed terms and conditions,
thereby creating a legally binding contract.
Best Value  The duty under the Local Government Act in Scotland 2003 to
secure continuous improvement in the economy, efficiency and
effectiveness with which they exercise their functions.
BPIs Best Practice Indicators - A common, core set of National
Procurement Best Practice Indicators (BPIs) were developed by
the Scottish Government and designed to be applicable and useful
to PCCMTs in all parts of the public sector in Scotland.
CAT C At a national procurement level, Category C are local contracts for
use by individual public bodies.
Category A collection of commodities or services sourced from the same or
similar supply base, which meet a similar consumer need, or which
are inter-related or substitutable. 
Category Management Procurement approach used within Argyll and Bute Council to
manage categories of spend to increase efficiencies and
expertise.
CDM Regulations Construction (Design and Management) Regulations 2015
Collaboration Cooperative joint working with another public sector organisation. 
Commodity Sourcing
Strategy (CSS)
A document that shows the preparatory thinking that is done about
a procurement process, including sustainability considerations,
stakeholders to be involved, risks etc.
Community Benefits
Clauses
Community Benefits Clauses provide a means of achieving
sustainability in public contracts.
Contract Management The process of monitoring the performance of a supplier to
contract.
Contractor The provider of any supplies, services or works under contract. Or,
in the context of works, at any stage of the process. 
Section 10 – Glossary

Page 51

Section 10:  Glossary Page 49 of 53 Back to Contents 
Term Description
Demand Management To take costs out of an organisation by addressing the drivers for
spend, aligning spend to business need and eliminating
unnecessary consumption.
DMT Departmental Management Team within Argyll and Bute Council
Dynamic Purchasing
System
Dynamic Purchasing System (DPS) - Electronic system that can
be established to purchase goods and services, similar to a
framework agreement, but where new suppliers can join at any
time.
Equality Duty Compliance with the terms of the Equality Act 2010 and any
guidance provided by the Scottish Ministers for local authorities to
comply with the Public Sector Equality Duties.
Fair Work First Fair Work First is the Scottish Government's flagship policy for
driving high quality and fair work across the labour market in
Scotland by applying fair work criteria to grants, other funding and
contracts being awarded by and across the public sector, where it
is relevant to do so.
Framework Agreements  An agreement or other arrangement between one or more
contracting authorities and one or more economic operators which
establishes the terms (in particular, the terms as to price and,
where appropriate, quantity) under which the economic operator
will enter into one or more contracts with a contracting authority in
the period during which the framework agreement applies.
HSCP Health and Social Care Partnership, also referred to as the Argyll
and Bute Integrated Joint Board being the Integration Joint Board
established by Order under Section 9 of Public Bodies (Joint
Working) (Scotland) Act 2014.
ICT Information and Communications Technology
IJB Integration Joint Board
JSCS Joint Strategic Commissioning Strategy.  Argyll and Bute HSCP
has developed a Joint Strategic Commissioning Strategy.  The
purpose of the Commissioning Strategy is to set out how the
Partnership will put in place a sustainable and diverse health and
social care service which meets current and future needs for our
communities.
KPIs Key Performance Indicators. Measurable value that demonstrates
how effectively the council is carrying out procurements.

Page 52

Section 10:  Glossary Page 50 of 53 Back to Contents 
Term Description
LTR  Light Touch Regime - Reference to the process for the award of a
public contract for social and other specific services.
Net Zero No longer adding to the total amount of greenhouse gases in the
atmosphere.
Greenhouse gases include carbon dioxide (CO2) and methane.
CO2 is released when oil, gas and coal are burned in homes,
factories and to power transport. Methane is produced through
farming and landfill. These gases increase global temperatures by
trapping the sun's energy.
Notice Advert
PCCMT                        Procurement, Commercial and Contract Management Team
within Argyll and Bute Council
PCIP Procurement Commercial Improvement Programme
Assessment Annual assessment of public sector organisations
that focuses on the policies and procedures driving procurement
performance and the results they deliver.
PCS Public Contracts Scotland - The national advertising portal used to
advertise all Scottish Government goods, services or works
contract opportunities.
PCS-T Public Contracts Scotland-Tender - The national eTendering
system.
PECOS Professional Electronic Commerce Online System – cloud based
purchase to pay system used by Argyll and Bute Council.
PIN Prior Information Notice - Early notices on PCS to advise of the
intention to advertise later.
PPP Public Private Partnership
Is a partnership between local government and private companies
to provide services to the community.
Procurement Exercise Full end to end procurement exercise documentation from strategy
development to contract and supplier management.
Procurement Function The business management function that ensures identification,
sourcing, access and management of the external resources that
an organisation needs or may need to fulfil its strategic objectives.

Page 53

Section 10:  Glossary Page 51 of 53 Back to Contents 
Term Description
Procurement Journey Revised public procurement toolkit with guidance and templates
on the procurement process or Construction manual when
appropriate. The Procurement Journey will be enhanced on an
ongoing basis with feedback from users and any other identified
good practice guidance and tools, where appropriate, to ensure a
standardised approach to the supply base.
Procurement Manual Internal Argyll and Bute Council operational procurement guide.
Procurement Strategy The Procurement Reform (Scotland) Act 2014 requires contracting
authorities with significant procurement expenditure in the next
financial year to publish a procurement strategy setting out how
they intend to carry out regulated procurements, or review the
current strategy and make appropriate revisions.  
P2P  Purchase to Pay Process - Entire supply chain process, from
goods receipt to payment process.
Quick Quote Procurement method for lower value tenders, where the Invitation
to Quote/Invitation to Tender is sent to a set distribution list of
suppliers rather than being publically advertised.
Scotland Excel Scotland Excel is the Centre of Procurement Expertise for
Scotland's local government sector.
Scottish Procurement Directorate within the Scottish Government, carrying out
procurements on behalf of the Scottish public sector.
SDS Self-Directed Support
Services/ Supplies/
Works
A public service contract is a contract having as its object the
provision of services.
A public supply contract is a contract having as its object the
purchase, lease, rental or hire purchase with or without an option
to buy, of products.
A public works contract is a contract having as its object a building
or civil engineering project or piece of work.
Small Medium
Enterprise (SME)
The category of micro, small and medium-sized enterprises
(SMEs) is made up of enterprises which employ fewer than 250
persons and which have an annual turnover not exceeding £36m
and/or an annual balance sheet total not exceeding £18m.
Companies House accounts guidance - GOV.UK (www.gov.uk)
SMT Strategic Management Team within Argyll and Bute Council

Page 54

Section 10:  Glossary Page 52 of 53 Back to Contents 
Term Description
Social Enterprises Businesses whose primary objectives are social or “more than
profit”.
Specifications The part of the invitation to quote or invitation to tender which
details the nature and quality of the goods, services or works.
Stakeholder Any person or group who has a vested interest in the success of
the procurement activity, i.e. either provides services to it, or
receives services from it.
Standing Orders The set of rules governing the procurement and financial
regulations with which the council must comply, in terms of the
Local Government Scotland Act 1973.
Supplier An entity who supplies goods or services.
Supplier Development
Programme
A business support initiative using training and information to
improve the competitiveness of local businesses.
Supply Chain All activities, resources, products etc. involved in creating and
moving a product or service from the supplier to the procurer.
Supported Business A supported business’ primary aim is the social and professional
integration of disabled or disadvantaged persons. At least 30 per
cent of the employees of those businesses should be disabled or
disadvantaged.
Sustainability In relation to procurement, sustainability involves understanding
the potential environmental, social and economic impacts that are
a result of purchasing decisions. 
Tender An offer, or bid, by a tenderer in response to an invitation to tender
(ITT) or a mini-tender in a framework agreement.
Third Sector The third sector includes charities, social enterprises and voluntary
groups; delivers essential services, helps to improve people's
wellbeing and contributes to economic growth.
Value for Money An economic assessment by the public sector as to whether a
project represents value for money; the optimum combination of
cost and quality to provide the required service.
Whole Life Costs The costs of acquiring goods or services (including consultancy,
design and construction costs, and equipment), the costs of
operating it and the costs of maintaining it over its whole life
through to its disposal – that is, the total ownership costs. These
costs include internal resources and overheads.

Page 55

Section 11: Strategy Ownership
and Contact Details Page 53 of 53 Back to Contents 
11.1 The Argyll and Bute Council Procurement, Commercial and Contract
Management Team are part of the Legal and Regulatory Support Services team
which sits within the Customer Services Directorate. 
11.2 The Procurement, Commercial and Contract Management Team works with the
council’s services and suppliers to develop contracts and procedures to deliver
Best Value. 
11.3 The team is responsible for the procurement of works, goods and services for all
council departments; and for developing procurement processes, procedures,
strategies and policies in line with national best practice. 
11.4 If you have any queries in relation to this strategy, please contact: 
• Anne MacColl-Smith, Manager, Procurement, Commercial and Contract
Management Team
• Procurement@argyll-bute.gov.uk 
Section 11 – Strategy Ownership & Contact Details