Financial Reports Monitoring Pack - 31 December 2024

Argyll and Bute Council · 20 February 2025
Back to Policy and Resources Committee — 20 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 20 FEBRUARY 2025
FINANCIAL REPORTS MONITORING PACK – 31 DECEMBER 2024  
1. INTRODUCTION 
1.1  This report provides an Executive Summary of the overall financial position of the
council for 2024-25 as at 31 December 2024.  It summarises the detailed financial
monitoring reports in respect of the following: 
• Revenue Budget;
• Financial Risks; 
• Capital Plan; and
• Reserves and Balances. 
2. DETAIL 
2.1 Revenue Budget Monitoring Report 
2.1.1 This report provides a summary of the actual and forecast outturn expenditure and
income of the council in comparison to the approved 2024-25 revenue budget. 
2.1.2  As at 31 December 2024, there is a forecast overspend of £4.215m on the approved
budget for the year.  The variances from budget comprise the following: 
• Within Social Work, a forecast overspend of £2.179m, relating to demand for
residential placements within Children and Families and Older Peoples Services. 
• Within Roads and Infrastructure Services, a forecast overspend of £1.610m,
mainly due to increased bus contract renewal costs for Public and Pupil Transport
across Argyll and Bute, additional costs relating to repairs to the Belnahua Ferry,
the Transport of ASN pupils, Temporary Accommodation and two unrealised
savings for additional income from Traffic Regulation Orders (TB13b) and
Stadiums (TB12b); partially offset by additional income in Waste, a reduction in
Landfill Tax costs due to reduced tonnage levels in Helensburgh Waste Disposal
and vacancy savings across the department.   
• Within Education, a forecast overspend of £0.241m due to higher than budgeted
demand for Schools Residential placements, partially offset by lower than
anticipated spend on catering purchases, receipt of historic water refunds,
slippage in Education 100 Day Promise spend due to delays in recruitment, lower
than anticipated uptake of Universal Free School Meals and a lower spend on
condition surveys due to favourable market conditions and good procurement
practice. 
• Within Central Budgets, a forecast overspend of £0.513m overall, relating to the
pay award and higher than budgeted inflation on insurance, partially offset by
lower than anticipated contributions to Joint Boards.  There is a forecast

Page 2

overspend of £0.252m for 2024-25 pay awards, as the Scottish Government
requires councils to fund 3.2%, while the budget only has 3% built in.  This is
recognised within Other Operating Income and Expenditure for current
monitoring purposes. Implications of the pay award will be reflected across
departments in future monitoring reports.   
• Within Funding, an over-recovery of Council Tax income on second homes of
£0.328m. 
2.1.3 
2.1.4 
It is anticipated that savings in interest costs will be achieved during the year, as a
result of slippage in the capital programme; and the deferral of new long-term
borrowing, due to the favourable cash position.  This will provide capacity to either
repay debt or contribute one-off additional resources towards meeting the forecast
2025/26 budget gap, through a contribution to General Fund reserves in 2024/25. 
As such, no variance has been assumed in the 2024/25 forecast outturn position. 
There is an overspend of £20.363m on the profiled budget to date.  The year to date
variances mainly relate to the actual timing of income and expenditure and
recharging of costs to capital, in comparison to assumed budget profiles.  The main
focus of budget monitoring is the forecast outturn position.   
2.1.5 Policy budget savings options, relating to 2024-25, total £6.467m.  The table below
outlines progress on the delivery of these savings as at 31 December 2024.   
Category No. of
Options
2024-
25
£000
2024-25
FTE
2025-26
£000
2025-
26
FTE
Future
Years
£000
Future
Years
FTE 
Delivered 7 5,556.0 10.9 5,723.0 10.9 5,723.0 10.9
On Track to be
Delivered 6 790.0 4.0 671.0 4.0 671.0 4.0
Still to be Implemented 1 0.5 0.0 0.5 0.0 0.5 0.0
Being Developed 0 0.0 0.0 0.0 0.0 0.0 0.0
Will not be achieved 2 120.0 0.0 170.0 0.0 170.0 0.0
Potential Shortfall 0 0.0 0.0 0.0 0.0 0.0 0.0
Delayed 0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 16 6,466.5 14.9 6,564.5 14.9 6,564.5 14.9 
2.1.6 Two savings, totalling £120k are categorised as ‘Will not be achieved’ and a cost
pressure will be considered as part of the 2025-26 budget process in this respect. 
2.1.7 Health and Social Care Partnership (HSCP) – Financial Update 
The 2024-25 HSCP forecast outturn position as at 31 December 2024 is an
overspend of £2.775m (£2.179m Social Work, £0.596m Health). The Chief Financial
Officer of the IJB has now written to the Council to request access to the Strathclyde
Pension Fund Gain that is held in reserves for the HSCP and, therefore, it is expected
that Social Work will outturn within budget, after applying these reserves.

Page 3

2.2 Financial Risks 
2.2.1  This report outlines the process and approach to financial risk assessment and
provides an update on the current known financial risks facing the council in 2024-
25.   
2.2.2 There are 4 council wide revenue risks identified for 2024-25, with a potential annual
value totalling £2.583m, and with varying degrees of likelihood.   
2.2.3 There are currently 42 departmental risks, with a potential annual value totalling
£6.693m, of which 5 are categorised as ‘Likely’.  These will continue to be monitored
and reviewed on an ongoing basis, with action taken to mitigate or manage these
risks.   
2.2.4 The current top three risks in terms of the financial impact are noted in the table
below. 
SERVICE RISK TITLE DESCRIPTION LIKELI-
HOOD
FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance -
Bridges,
Culverts & Sea
Defences
Extreme localised weather
may result in loss of bridge,
culvert, road or sea
defence.
3 1,500
Roads and
Infrastructure
Services
Waste PPP -
Indexation
Historical payments made
towards Waste PPP based
on indexation rates have
been challenged by Renewi
resulting in a potential cost
to the council.
3 586
Financial
Services
Council Tax
Debt
Collection
Recovery
Recovery of debt becomes
more difficult to pursue in
the current economic
climate.  This is in relation
to historical debt that has
accumulated over many
years therefore any adverse
collection rates will impact
on the year end debt
provision as opposed to the
in-year financial position,
hence no forecast variance
has been reported within
the current year.
3 345 
2.2.5  The number of council wide risks has reduced from 7 to 4 since the previous
reporting period, due to confirmation of the 2024-25 pay awards, and progress on
the delivery of approved 2024-25 revenue budget savings options.  There have been
no changes to the departmental risks since last reporting.

Page 4

2.3 Capital Plan Monitoring Report 
2.3.1 This report provides an update on financial performance and the delivery of capital
projects against the approved capital plan budget resources and timescales as at 31
December 2024. 
2.3.2 Forecast net expenditure for the full financial year is £28.774m, compared to a
profiled annual budget of £37.056m, giving rise to a forecast underspend for the year
of £8.282m (22.35%). Actual net expenditure of £23.679m has been incurred in the
year to date, representing 82% of the net expenditure forecast for the year. 
2.3.3 The forecast outturn net expenditure on the total Capital Plan is £203.116m,
compared to a budget of £202.999m, giving rise to a forecast overspend for the
overall capital plan of £0.117m (0.06%). 
2.3.4 There are a total of 153 projects within the overall Capital Plan. Of this total, 139 or
91% are Complete or On Target, 8 or 5% are Off Target and Recoverable and 6 or
4% are Off Track and experiencing Problems. 
2.3.5 There are a number of risks, which may impact the delivery of the plan within
available resources and target timescales.  The capital programme continues to see
significant price increases, as well as disruptions to the supply chain and longer lead
in times, which makes it challenging to manage delivery of projects within available
resources and target timescales.  In recent years, additional funding of £11.100m
has been made available to manage these cost pressures.  Whilst this has helped
mitigate the impact to date, these additional resources have now been fully allocated. 
There remains a financial risk in respect of projects, where contracts have yet to be
entered into.  Therefore, it should be noted that there are likely to be other significant
financial impacts, which are not quantifiable, at this stage. The monitoring and review
of risks will continue to be undertaken on an ongoing basis and regularly reported to
committee. 
2.4 Reserves and Balances 
2.4.1 This report summarises the overall level of reserves and balances held by the council
and monitors the use of the earmarked reserves held within the General Fund.   
2.4.2 The council has a total of £400.319m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
2.4.3 As at 31 March 2024, the council held usable reserves, totalling £121.701m,
comprising the following: 
• £2.763m Repairs and Renewals Fund;
• £3.197m Capital Funds; and
• £115.741m General Fund, with £107.443m of this balance earmarked for specific
purposes. 
2.4.4  At the budget setting meeting on 22 February 2024, as part of the revenue budget,
Council agreed to the transfer Strathclyde Pension Fund contribution savings of
£6.875m relating to council staff and £3.053m relating to Social Work staff to
reserves.  It was also agreed that £1.875m of revenue surplus within 2024-25 be
transferred to the Capital Plan.  As the commitments for these include expenditure
within 2024-25 year, these have been immediately recognised within the earmarked
reserves balances to allow them to be spent accordingly. In addition, Scottish

Page 5

Government funding in relation to the 23-24 pay award has been notified at a value
of £0.371m and this has been reinstated to the Connect for Success earmarking as
planned. Further, following a review of earmarked reserves, at its meeting of 26
September 2024, Council approved the release of reserves totalling £1.558m,
previously earmarked for specific purposes, back to the unallocated General Fund. 
The element of the General Fund balance currently earmarked for specific purposes
now totals £118.059m. 
2.4.5 The current earmarked General Fund balance of £118.059m comprises the
following: 
• £58.413m invested or committed for major initiatives/capital projects; 
• £10.784m already drawn down;
• £15.808m still to be drawn down in 2024-25; and
• £33.054m planned to be spent in future years. 
2.4.6 The table below summarises the position of the unallocated General Fund balance. 
Further explanation of the figures can be found at Section 3.4 of the Reserves and
Balances report.  
Heading Detail £000
Unallocated General Fund
as at 31 March 2024
This is the balance that is unallocated
over and above the 2% contingency,
which amounts to £6.039m 
2,259
Current Forecast Outturn
for 2024-25 as at 31
December 2024 
Per Revenue Budget Monitoring report (4,215)
Social Work Forecast
Outturn adjustment
Social Work variance expected to be
managed from within IJB reserves 
2,179
LiveArgyll Funding Award Contribution in respect of RNM event,
to be met from unallocated GF
balance
(25)
Forecast Unallocated General Fund as at 31 March 2025 198 
2.4.7 After taking account of the current forecast outturn for 2024-25, the council’s
unallocated General Fund balance, over and above the general contingency, is
forecast to reduce to £0.198m as at 31 March 2025. 
2.4.8 As at 31 December 2024, the commitments against the Strathclyde Pensions fund
gain Transformation/Spend to Save projects earmarking are as follows: 
Description Commitment
£000
Data Platform Build Consultancy 44
RIS Service Review 150
Conversational AI 31 
225 
Further details can be found on the Reserves and Balances report at section 3.7.4.

Page 6

2.5 VIREMENTS OVER £0.200m (Revenue) 
2.5.1 Virement is the process of transferring budget between cost centres, services or
departments or between capital projects.  The Council’s constitution notes that
virements over £0.200m require approval by Council.  This section of the report will
be used to outline revenue virements in the period that require approval.  Capital
virements are included within the capital monitoring report. 
2.5.2 There are no virements requiring approval since last reporting. 
3.  RECOMMENDATIONS 
3.1 It is recommended that the Policy and Resources Committee: 
a) Note the revenue budget monitoring report as at 31 December 2024; 
b) Note the financial risks for 2024-25; 
c) Note the capital plan monitoring report as at 31 December 2024 and approve the
proposed changes to the capital plan outlined in Appendix 4 of that report; and 
d) Note the reserves and balances report as at 31 December 2024. 
4. IMPLICATIONS 
4.1 Policy – None.
4.2 Financial -  Outlines the 2024-25 financial position
of the council as at 31 December 2024
4.3 Legal -  None.
4.4 HR -  None.
4.5 Fairer Scotland Duty -   None.
4.5.1 Equalities – protected characteristics -  None.
4.5.2 Socio-economic Duty -  None.
4.5.3 Islands -  None.
4.6 Climate Change - None.
4.7 Risk -  Provides a financial risks summary 
4.8 Customer Service -  None. 
4.9 The Rights of the Child (UNCRC) -  None. 
Kirsty Flanagan
Executive Director /Section 95 Officer
17 January 2024 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
For further information contact Carolyn Earl, covering Head of Financial Services
Carolyn.Earl@argyll-bute.gov.uk

Page 7

REVENUE BUDGET MONITORING REPORT AS AT 31 DECEMBER 2024 POLICY & RESOURCES COMMITTEE      
20 FEBRUARY 2024
2024-25 Overall Position
There is a forecast overspend of £4.215m as at 31 December 2024, comprising the following:
• Within Social Work, a forecast overspend of £2.179m, which reflects demand for residential placements within Children and Families
and Older Peoples Services;
• Within the Executive Directorate of Kirsty Flanagan, a forecast net overspend of £1.610m.  Overspends relate to increased bus contract
renewal costs for Public and Pupil Transport across Argyll and Bute, additional costs relating to repairs to the Belnahua Ferry, the
Transport of ASN pupils, Temporary Accommodation and two unrealised savings for additional income from Traffic Regulation Orders
(TB13b) and Stadiums (TB12b).   These overspends are partially offset by additional income in Waste, a reduction in Landfill Tax costs
due to reduced tonnage levels in Helensburgh Waste Disposal and vacancy savings across the department;
• Within the Executive Directorate of Douglas Hendry, a forecast net overspend of £0.241m due to higher than budgeted demand for
school residential placements; partially offset by lower than anticipated spend on catering purchases, receipt of historic water refunds,
slippage in Education 100 Day Promise spend due to delays in recruitment, lower than anticipated uptake of Universal Free School
Meals and a lower spend on condition surveys due to favourable market conditions and good procurement practices;
• Within Central Budgets, a forecast overspend of £0.513m overall, relating to the pay award and higher than budgeted inflation on
insurance, partially offset by lower than anticipated contributions to Joint Boards.  There is a forecast overspend of £0.252m for 2024-
25 pay awards, as the Scottish Government requires councils to fund 3.2%, while the budget only has 3% built in.  This is recognised
within Other Operating Income and Expenditure for current monitoring purposes, with implications of the pay award to be reflected
across departments in future monitoring reports; and
• Within funding, a projected over-recovery of income for Council Tax on 2nd Homes of £0.328m.
There is a year to date overspend of £20.363m. The year to date variances within the departments tend to relate to the timing of income and
expenditure and costs to capital not recharged yet. 
Key Highlights as at December 2024
Key highlights include the following: 
• Council services are projecting an overspend of £4.215m as at 31 December 2024. This includes £2.179m in respect of Social Work,
which is expected to be funded from within the Health and Social Care Partnership’s reserves.  The balance of the overspend is
£2.036m.

Page 8

• Council’s require to fund 3.2% of the 2024-25 pay award, with only 3% provided for within the approved budget, creating a budget
pressure £0.252m.  This is currently included within Central Services, for current monitoring purposes, however, will be reflected across
council services in future budget monitoring reports. 
Key Financial Successes 
Performance against budget for 2023-24 was an overall net favourable position of £1.728m underspend after adjusting for year-end
earmarking. This breaks down as: 
• £1.037m net overspend in relation to council expenditure (excluding loans fund)
• £0.033m over-recovery of Council Tax income
• £5.932m underspend from the Loans Fund due to a higher return on investments than in the previous year, limiting new borrowing by
utilising cash balances instead, slippage within the capital programme and a one-off treasury gain as a result of a discount on the early
repayment of loans
• £3.200m of new unspent budget earmarkings 
Key Financial Challenges Proposed Actions to address Financial Challenges
Addressing service demand/expectation and the increasing challenges
facing departments across the council in relation to the recruitment and
retention of suitably qualified and experienced staff.
Engagement and monitoring of both issues with departments to
assess how these challenges are affecting service capacity and
capability, staff attendance, utilisation of agency staff and costs.
Collaboration with services and other back-office teams to consider
and develop mitigating actions.
Achieving a favourable year-end position and achieving savings targets
in light of council wide risks to expenditure. 
Robust monitoring of the financial position and delivery of savings to
ensure budget issues inform the budget monitoring process.
Monitoring Social Work expenditure and more widely the IJB position as
any overspend will transfer back to partner bodies in the first instance. 
Continue to work closely with the CFO of the IJB to ensure that early
indication of any potential adverse financial outturn is identified and
corrective action is agreed as appropriate to reduce the risk to the
council. 
Identifying further savings and delivering services more efficiently with
less resources, as whilst a balanced 2024-25 budget was agreed in
February 2024 there are still significant budget gaps in future years.
The council will continue to progress savings options identified, refine
options that require further development and seek to identify further
savings through themed reviews and business process reviews. A
longer-term approach is being explored with the intention to develop
a pipeline of savings that can be delivered over a number of years.
Maintaining or improving the level of service income recovered, for
example planning, building standards and car parking. 
Actively monitor income recovery and ensure council fees and
charges policies are regularly reviewed. 
Managing spend in service areas which are demand led and, to some
extent, outwith service control, for example Winter Maintenance. 
Use a risk-based approach to budget monitoring to focus additional
attention on these areas.

Page 9

Ongoing requirement to fund unavoidable inflationary increases in areas
like utility costs, fuel, food etc. 
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be evaluated and reported through the
budget monitoring and preparation processes. 
Cost of living crisis impacting on pay inflation negotiations which could
result in pay awards above what is deemed affordable.
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be evaluated and reported through the
budget monitoring and preparation processes.
Future ongoing impact on revenue budgets as a result of the delivery of
substantial capital projects such as Rothesay Pavilion and a new school
on Mull.
Ensure costs are identified and reported on early in the process so
Members are aware of the ongoing financial impact to budgets.
Monitor and report on these regularly as part of the routine budget
monitoring once the projects are complete.
Delivery of climate change measures which can be costly and result in
overspends.
The council will look at financially sustainable options and closely
monitor the impact of these on the budget position. 
Forecast Outturn Position
There is a forecast Overspend of £4.215m for 2024-25 as at 31 December 2024.

Page 10

Department
Annual
Budget   
£000
Forecast
Outturn   
£000
Current
Forecast
Variance
(Dec)
£000
Previou
s
Forecas
t
Varianc
e (Oct)
£000
Change
£000
Explanation
Chief Executive's Unit 1,202 1,202 0 0 0
Executive Director (Douglas He 149,852 150,093 (241) (188) (53)
The projected overspend is due to the Schools Residential Budget
having a higher demand for placements than budget allows,
partially offset by lower than anticipated spend in catering
purchases, receipt of historic water refunds, slippage in Education
100 Day Promise budget due to delays in recruitment, lower than
anticipated uptake of Universal Free School Meals and a lower
spend on condition surveys due to favourable market conditions
and good procurement.
Executive Director (Kirsty Flana 58,181 59,791 (1,610) (1,610) 0
The projected overspend is due to increased bus contract renewal
costs for Public and Pupil Transport across Argyll and Bute,
additional costs relating to repairs to the Belnahua Ferry, the
Transport of ASN pupils, Temporary Accommodation and two
unrealised savings for additional income from Traffic Regulation
Orders (TB13b) and Stadiums (TB12b).   These overspends are
partially offset by additional income in Waste, a reduction in Landfill
Tax costs due to reduced tonnage levels in Helensburgh Waste
Disposal and vacancy savings across the department.
Weather Incident 2,787 2,787 0 (780) 780
A contribution from Crown Estates funding of £780k, as part of the
funding framework for the unbudgeted revenue costs of the severe
weather event has now been confirmed.  There is no longer an
adverse budget variance in this respect.
Social Work 77,239 79,418 (2,179) (2,049) (130)
The projected overspend is due to demand for residential
placements within children and Families and Older People
Services
Central Budgets 22,358 22,871 (513) (261) (252)
The projected overspend is due to a recognition that Scottish
Government have asked Councils to fund a further 0.2% increase
for the pay awards for 24-25 (£0.252m), pressure on the insurance
budgets inflation being higher than estimated, partially offset by
lower than anticipated contributions to Joint Boards.
Financed By ####### (311,947) 328 328 0 There is a projected over-recovery of income for Council Tax on
2nd Homes of £0.328m.
Total 0 4,215 (4,215) (4,560) 345  
Note: Further information on the departmental forecast variances is included later on in the report.

Page 11

Year to Date Position

Page 12

The year to date position as at 31 December 2024 is an overspend of £20.363m and the main variances are noted below. 
Department
YTD
Actual
£'000
YTD
Budget
£'000
YTD
Variance   
£'000
Explanation
Chief Executive's Unit 881 864 (17) The year to date overspend can be attributed to profiling issues.
Executive Director (Douglas Hendry) 111,006 108,955 (2,051) The year to date overspend is mainly due to the pressure on the Schools
Residential Budget, combined with the impact of the pay award and the budget
profile not being realigned to reflect this. There are also advance payments for
software which will be adjusted at year end through a prepayment which are
skewing the YTD position as well as the impact of timing of receipt of grant income
to offset grant expenditure.
Executive Director (Kirsty Flanagan) 48,465 43,300 (5,165) The year to date overspend, is mainly due to the profile of a number of budgets
across the department, mainly with Roads & Lighting and Marine.
Weather Incident 3,497 2,032 (1,465) The year to date overspend can be attributed to profiling issues.
Social Work 50,031 49,332 (699) The year to date overspend is due to demand driven services within Children and
Families and Older People
Central Budgets 5,867 5,664 (203) The year to date overspend can be attributed to profiling issues.
Funding (207,280) (218,043) (10,763) The year to date overspend can be attributed to profiling issues.
Total Net Expenditure 12,467 (7,896) (20,363)

Page 13

Note: Further information on the departmental year to date variances is included later on in the report. 
OBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 31 DECEMBER 2024
0%
25%
50%
75%
100%
Chief Executive's Unit
Executive Director (Kirsty
Flanagan)
Executive Director (Douglas
Hendry) Social W
ork
Central Budgets
TOTAL
Expenditure to date against the remaining budget for each
Department
YTD Actual £000 Remaining Budget £000

Page 14

YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual Budget Forecast
Outturn
Forecast
Variance
Variance
£'000 £'000 £'000 % £'000 £'000 £'000 %
Departmental Budgets
Chief Executive's Unit 881 864 (17) (2.0%) 1,202 1,202 0 0.0%
Executive Director (Douglas Hendry) 111,006 108,955 (2,051) (1.9%) 149,852 150,093 (241) (0.2%)
Executive Director (Kirsty Flanagan) 48,465 43,300 (5,165) (11.9%) 58,181 59,791 (1,610) (2.8%)
Weather Incident 3,497 2,032 (1,465) 0.0% 2,787 2,787 0 0.0%
Social Work 50,031 49,332 (699) (1.4%) 77,239 79,418 (2,179) (2.8%)
Total Departmental Budgets 213,880 204,483 (9,397) (4.6%) 289,261 293,291 (4,030) (1.4%)
Central Budgets
Other Operating Income and Expenditure (2,932) 1,417 4,349 306.9% 3,541 3,593 (52) (1.5%)
Joint Boards 1,026 1,093 67 6.1% 1,458 1,344 114 7.8%
Non-Controllable Costs 7,773 3,154 (4,619) (146.5%) 17,359 17,934 (575) (3.3%)
Total Central Budgets 5,867 5,664 (203) (3.6%) 22,358 22,871 (513) (2.3%)
TOTAL NET EXPENDITURE 219,747 210,147 (9,600) (4.6%) 311,619 316,162 (4,543) (1.5%)
Financed By
Aggregate External Finance (149,581) (160,344) (10,763) 6.7% (249,731) (249,731) 0 0.0%
Local Tax Requirement (57,699) (57,699) 0 0.0% (63,278) (63,606) 328 (0.5%)
Contributions to General Fund 0 0 0 0.0% 12,174 12,174 0 0.0%
Earmarked Reserves 0 0 0 0.0% (10,784) (10,784) 0 0.0%
Total Funding (207,280) (218,043) (10,763) 4.9% (311,619) (311,947) 328 (0.1%)
(Deficit)/Surplus for Period 12,467 (7,896) (20,363) 0 4,215 (4,215) (1.4%)
CURRENT PROJECTED FINAL OUTTURNYEAR TO DATE (YTD) POSITION

Page 15

SUBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 31 DECEMBER 2024
YTD
Actual
YTD
Budget
YTD
Variance
Variance Annual
Budget
Forecast
Outturn
Forecast
Variance
Variance
£'000 £'000 £'000 % £'000 £'000 £'000 %
Subjective Category
Employee Expenses 139,790 133,789 (6,001) (4.5%) 192,106 195,316 (3,210) (1.7%)
Premises Related Expenditure 16,111 15,460 (651) (4.2%) 22,430 22,786 (356) (1.6%)
Supplies and Services 22,081 21,490 (591) (2.8%) 28,930 29,099 (169) (0.6%)
Transport Related Expenditure 11,609 9,676 (1,933) (20.0%) 18,292 18,782 (490) (2.7%)
Third Party Payments 136,140 136,735 595 0.4% 190,005 192,894 (2,889) (1.5%)
Capital Financing 2,738 (3,646) (6,384) 10,626 10,626 0 0.0%
TOTAL EXPENDITURE 328,469 313,504 (14,965) (4.8%) 462,389 469,503 (7,114) (1.5%)
Income (316,002) (321,400) (5,398) 1.7% (462,389) (465,288) 2,899 (0.6%)
(Deficit)/Surplus for Period 12,467 (7,896) (20,363) 0 4,215 (4,215)
YEAR TO DATE (YTD) POSITION CURRENT PROJECTED FINAL OUTTURN
Notes
YTD represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. 
Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.

Page 16

CHIEF EXECUTIVE’S UNIT – AS AT 31 DECEMBER 2024
The department is currently forecasting spend in line with budget.
The department has a year to date underspend of £0.017m (2%) which can be attributed to budget profiling issues.
Forecast Outturn Position
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
(Dec)
£000
Previous
Forecast
Variance
Reported
to P&R
(Oct)
£000
Change
£000
Chief Executive 1,202 1,202 0 0 0
Totals 1,202 1,202 0 0 0
Year to Date Position
Key Financial Successes:
• All savings options have been delivered.
• The department’s 2023-24 outturn position was an underspend of £0.006m. This resulted from an overall underspend of £0.014m offset
by earmarking of £0.008m due to an auto-carry forward for unspent grants.
Key Financial Challenges: Proposed Actions to address Financial Challenges:
To continue to deliver a high-quality service to support community
engagement and participation.
Regular monitoring, reflection and improvement cycle on service
provision to ensure most efficient use of staffing and financial
resources to meet national and local policy requirements for quality
engagement.
0%
25%
50%
75%
100%
Chief Executive
Expenditure to date against the remaining budget for each
Service
YTD
Actual
£000
Remaining Budget
£000

Page 17

To continue to deliver a high quality support service function to community
organisations and community planning partners during a time of challenge
arising from continuing reductions in funding.
Within the partnership working of the CPP we seek to establish
working groups and collate resources within this to deliver high
quality solutions to identified needs.
Demands for funding from community applications to the Supporting
Communities Fund higher than available annual funds by about 40%.
Continue to monitor fund criteria adapting this to align with priority
outcomes for Argyll & Bute and continue to support groups to seek
alternative sources of funding from our database of funding
providers.

Page 18

CHIEF EXECUTIVE’S UNIT – OBJECTIVE SUMMARY AS AT 31 DECEMBER 2024 
Service Area YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Executive 308 296 (12) (4.1%) 417 417 0 0.0% Outwith reporting criteria.
Community Planning
& Development 573 568 (5) (0.9%) 785 785 0 0.0% Outwith reporting criteria.  
881 864 (17) (2.0%) 1,202 1,202 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. 
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 19

CHIEF EXECUTIVE’S UNIT – SUBJECTIVE SUMMARY AS AT 31 DECEMBER 2024
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 732 719 (13) (1.8%) 1,019 1,019 0 0.0% Outwith reporting criteria.
Supplies and
Services 14 18 4 22.2% 21 21 0 0.0% Outwith reporting criteria.
Transport 5 11 6 54.6% 14 14 0 0.0% Outwith reporting criteria.
Third Party 165 168 3 1.8% 228 228 0 0.0% Outwith reporting criteria.
Income (35) (52) (17) 32.7% (80) (80) 0 0.0% Outwith reporting criteria.
Totals 881 864 (17) (2.0%) 1,202 1,202 0 0.0%   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. 
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 20

CHIEF EXECUTIVE’S UNIT – RED VARIANCES AS AT 31 DECEMBER 2024
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation      
0 0.0%   
A red variance is a forecast variance which is greater than +/- £50,000.

Page 21

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – AS AT 31 DECEMBER 2024  
The department is currently forecasting an overspend of £0.241m (0.2%) due to the Schools Residential Budget having a higher demand for
placements than budget allows, partially offset by lower than anticipated spend in catering purchases, receipt of historic water refunds,
slippage in Education 100 Day Promise budget due to delays in recruitment, lower than anticipated uptake of Universal Free School Meals and
a lower spend on condition surveys due to favourable market conditions and good procurement. 
The department has a year to date (YTD) overspend of £2.051m (1.9%). This is mainly due to the above noted pressure on the Schools
Residential Budget, combined with the impact of the pay award and the budget profile not being realigned to reflect this. There are also advance
payments for software which will be adjusted at year end through a prepayment which are skewing the YTD position as well as the impact of
timing of receipt of grant income to offset grant expenditure.                           
Forecast Outturn Position 
Service Annual
Budget 
£000
Forecast
Outturn 
£000
Current
Forecast
Variance
(Dec) 
£000
Previous
Forecast
Variance
Reported
to P&R
(Oct) 
£000
Change 
£000
Executive Director
(Douglas Hendry) 390 390 0 0 0
Head of
Commercial
Services
10,169 10,019 150 150 0
Head of Education 118,112 118,588 (476) (448) (28)
Head of Legal and
Regulatory
Support
21,181 21,096 85 110 (25)
Totals 149,852 150,093 (241) (188) (53) 
Year to Date Position 
0%
25%
50%
75%
100%
Executive Director
(Douglas Hendry)
Head of
Commercial
Services
Head of Education Head of Legal and
Regulatory Support
Expenditure to date against the remaining budget for each
Service
YTD
Actual
£000
Remaining Budget
£000

Page 22

Key Financial Successes:
The 2023-24 year-end consolidated outturn position was an under spend of £0.690m after adjusting for automatic earmarking. Contributing
factors included:
• Effective contract management of NPDO and Hub School contracts, including a lower-than-expected insurance premium due to the
annual renegotiation of insurance costs. 
• Successful negotiations with utility suppliers achieved further historic water charge refunds and ongoing reductions to water rates.
• Implementation of NDEEF project resulting in recurring annual saving in utilities and a significant contribution to meeting Net Zero
targets.
• Rationalisation of office space through Our Modern Workspace Programme has reduced utility costs, printer costs and cleaning costs
as well as receiving Non-Domestic Rates relief for closed buildings. 
• Income generation within Early Years, including expansion at Rothesay Joint Campus to accommodate care for children under the age
of 2. 
Key Financial Challenges: Proposed Actions to address Financial Challenges:
The legacy impact of COVID-19 on our young learners has led to an
increased demand on the additional support need functions of the
Education Service in response to the growing health and wellbeing
needs of our young people and their families. This increase is consistent
across Scotland.
Analysis and review of delivery models has taken place, robust
costings of any agreed changes to delivery model and continual
monitoring of associated budgets. Maximise use of Additional
Support for Learning Funding and Mental Health and Wellbeing
Funding whilst working collaboratively across Children’s Services.
Impact of the current cost of living crisis on the cost of the school day for
learners and their families.
Collaborate with schools to ensure effective use of Strategic Equity
Funding and Pupil Equity Funding to close the poverty related
attainment gap and identify other funding sources to ensure equity
of experience for all children.
Impact of the current cost of living crisis on uptake in demand led service
areas like catering, design services and licensing.
Continually refine/develop systems to accurately forecast service
usage, budget outturn and future budget requirements. Strategies
in place to redesign services in line with demand. 
Rising cost of material and labour costs within the Central Repairs
Budget across the department may result in a reduction in activity or
overspends.
Costs are monitored regularly and contained as much as possible
with any unavoidable overspends highlighted as soon as known. 
Ensure that the School Catering Service remains efficient and effective
as the impact of high inflation on produce and a requirement to adhere to
the Statutory Guidance supporting Nutritional Requirements for Food and
Drink in Schools (Scotland) Regulations 2020, has increased the cost of
producing a school meal.
Through good procurement of supplies and the introduction of a
school meal pre order app that will reduce food waste. Produce
meals that pupils want to eat through regular consultation and a
range of menu choices.

Page 23

The Council has a requirement to deliver 1140 hours of Early Learning
and Childcare (ELC) to eligible 2-year-olds and all 3–5-year-old children.
Following two years of reduced funding the service must continually
redesign to fit the resources available. 
Robust service costings, financial monitoring and timely reporting
to ensure the service can be delivered within the available budget.
Medium term forecasting on population to shape ongoing service
redesign. Analysis of potential to extend income generation using
“spare” capacity to trial paid care for under 2’s
Impact of high inflationary uplifts within the NPDO/HUB School contracts.  Ensuring continued effective contract management of NPDO/HUB
Schools to minimise the impact of high inflationary uplifts. 
The Scottish Government has Ringfenced some Education funding which
is dependent on Maintaining Teacher Numbers (MTN) to a set level. The
target has increased for 2024-25 with no increase in funding.
Monitor teacher numbers and associated costs, highlighting any
budget pressures immediately. If teacher numbers fall due to
delays in recruitment, report the potential financial penalty to
departmental management.

Page 24

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – OBJECTIVE SUMMARY AS AT 31 DECEMBER 2024
Service Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director
(Douglas
Hendry)
Central/Management
Costs
289 288 (1) (0.4%) 390 390 0 0.0% Outwith Reporting Criteria
289 288 (1) (0.4%) 390 390 0 0.0%
Head of
Commercial
Services
Catering 16 (62) (78) 125.8% 320 320 0 0.0% The YTD overspend is due to
payment of backdated pay arrears
and the budget not being
realigned for this, combined with
usage of bank staff. This is all
partially offset by lower than
anticipated spend on catering
purchases and replacement of
catering equipment. 
Head of
Commercial
Services
Central/Management
Costs
985 972 (13) (1.3%) 1,721 1,621 100 5.8% The YTD overspend is profile
related and will be refined to
reflect the reported underspend
forecast variance through the
ledger due to the lower than
anticipated spend on catering
purchases.
Head of
Commercial
Services
CHORD 112 87 (25) (28.7%) 49 49 0 0.0% The YTD overspend is due to the
timing of recharges required from
capital to offset expenditure.
Head of
Commercial
Services
Cleaning (19) (66) (47) 71.2% 77 77 0 0.0% The YTD overspend is due to
payment of backdated pay arrears
and the budget not being
realigned for this, combined with
usage of bank staff. 
Head of
Commercial
Services
Culture, Heritage,
Recreation & Sport
4,277 4,323 46 1.1% 5,729 5,729 0 0.0% Outwith Reporting Criteria

Page 25

Head of
Commercial
Services
Events &
Commercial
Catering
123 (18) (141) 783.3% 7 7 0 0.0% The YTD overspend is due to
under-recovery of income within
Events and Commercial Cafes.
Finance are working closely with
Commercial Services to increase
income generation.
Head of
Commercial
Services
Property Portfolio (214) (158) 56 (35.4%) (189) (189) 0 0.0% The YTD underspend is due to the
timing of invoices for property
costs within surplus properties as
well as the profile of rental income
budgets. 
Head of
Commercial
Services
Property Services 586 695 109 15.7% 848 798 50 5.9% The YTD and forecast
underspend is on condition
surveys due to favourable market
conditions and good procurement.
The balance on the YTD
underspend is within staffing due
to delays in recruitment. 
Head of
Commercial
Services
Shared Offices 842 898 56 6.2% 1,607 1,607 0 0.0% The YTD underspend is due to
profiling of Central Repairs and
timing of works undertaken
combined with over-recovery of
Rental Income.    
6,708 6,671 (37) (0.6%) 10,169 10,019 150 1.5%  
Head of
Education
Additional Support
for Learning
8,886 8,764 (122) (1.4%) 12,338 12,338 0 0.0% The YTD overspend is due to
payment of backdated pay arrears
and the budget not being
realigned for this.
Head of
Education
Central/Management
Costs
2,103 1,829 (274) (15.0%) 2,722 2,722 0 0.0% The YTD overspend is due to
overspends in staffing, partially as
a result of the backdated pay
arrears, combined with staff
subsistence, conference fees and
travel budgets. 
Head of
Education
Community Learning
& Development
6 4 (2) (50.0%) 15 15 0 0.0% The YTD overspend is due to
central repairs costs in CLD
premises. This budget is managed
across the service as a whole.
Head of
Education
COVID 11 10 (1) (10.0%) 10 10 0 0.0% Outwith Reporting Criteria

Page 26

Head of
Education
Early Learning &
Childcare
13,210 13,097 (113) (0.9%) 18,094 18,094 0 0.0% The YTD overspend is within
Premises costs in 1140 Hours
which will be remedied through
budget reprofiling and drawdown
of earmarkings.
Head of
Education
Primary Education 30,455 29,743 (712) (2.4%) 41,055 40,975 80 0.2% The YTD overspend is due to
payment of backdated pay arrears
and the budget not being
realigned for this. The forecast
underspend is as a result of lower
uptake of Universal Free School
Meals than funding allows.
Head of
Education
Pupil Support 3,221 2,982 (239) (8.0%) 4,113 4,914 (801) (19.5%) The YTD and forecast overspend
as due to higher than budgeted
demand for Schools Residential
Placements. 
Head of
Education
Schools - Central
Services
1,642 1,066 (576) (54.0%) 2,401 2,156 245 10.2% The YTD overspend is due to the
current spend within Strategic
Equity Funding (SEF) and
Developing the Young Workforce
(DYW). For SEF we are waiting
receipt of funds following
confirmation in December of
funding awarded; for DYW funding
is due following our submitted
grant return. This is combined with
a YTD overspend on licence costs
which will be distributed to schools
in due course. The forecast
position reflects an underspend
within the 100 Day Promise
budget due to delays in staffing. 
Head of
Education
Secondary
Education
29,296 29,502 206 0.7% 37,364 37,364 0 0.0% The YTD underspend is profile-
related within staffing budgets in
secondary schools. This has been
impacted by outstanding Teacher
Cover adjustments which should
be processed in January. 
88,830 86,997 (1,833) (2.1%) 118,112 118,588 (476) (0.4%)  
Head of
Legal &
Regulatory
Support
Central/Management
Costs
186 177 (9) (5.1%) 262 262 0 0.0% Outwith Reporting Criteria

Page 27

Head of
Legal &
Regulatory
Support
Community Safety 166 119 (47) (39.5%) 187 187 0 0.0% The YTD overspend will be
rectified through processing of
prepayments at year end. 
Head of
Legal &
Regulatory
Support
Elections 67 33 (34) (103.0%) 37 61 (24) (64.9%) This overspend is due to the two
bi-elections that have been carried
out in 2024-25.  A forecast
variance has been processed
through the ledger to recognise
the position.  The remainder of the
YTD overspend is profile related.
Head of
Legal &
Regulatory
Support
Governance 508 445 (63) (14.2%) 733 734 (1) (0.1%) The YTD overspend is due to
payment of backdated pay arrears
and the budget not being
realigned for this as well as
overspend on communications
which will be rectified through
processing of prepayments at
year end.
Head of
Legal &
Regulatory
Support
Governance, Risk &
Safety
409 386 (23) (6.0%) 575 575 0 0.0% Outwith Reporting Criteria
Head of
Legal &
Regulatory
Support
Legal Services 302 363 61 16.8% 667 667 0 0.0% The YTD underspend is an over-
recovery of Licence fee income
while will reduce through the
processing of prepayments at
year end. This is partially offset by
overspends on Agency Staff and
the payment of backdated pay
arrears and the budget not being
realigned for this.
Head of
Legal &
Regulatory
Support
NPDO and Hub
Schools
12,299 12,279 (20) (0.2%) 16,947 16,837 110 0.6% The YTD overspend is profile
related and will be refined. The
forecast underspend reflects
receipt of non-recurring historic
water refunds. 
Head of
Legal &
Regulatory
Support
Procurement,
Commercial and
Contract
Management
776 755 (21) (2.8%) 1,116 1,116 0 0.0% Outwith Reporting Criteria
Head of
Legal &
Trading Standards &
Advice Services
466 442 (24) (5.4%) 657 657 0 0.0% Outwith Reporting Criteria

Page 28

Regulatory
Support    
15,179 14,999 (180) (1.2%) 21,181 21,096 85 0.4%      
111,006 108,955 (2,051) (1.9%) 149,852 150,093 (241) (0.2%)   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. 
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 29

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – SUBJECTIVE SUMMARY AS AT 31 DECEMBER 2024
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 79,254 77,234 (2,020) (2.6%) 109,974 109,729 245 0.2% The YTD overspend is partially due to payment of
backdated pay arrears and the budget not being
realigned combined with overspends on employee
costs against grants due to timing of offsetting income
receipt and subsequent budget position.
The forecast position reflects an underspend within the
100 Day Promise budget due to delays in staffing. 
Premises 7,053 6,690 (363) (5.4%) 9,637 9,587 50 0.5% The YTD overspend in minor adaptations budget will
be rectified by a drawdown from the early years
earmarked reserve.  There is also a YTD overspend in
Central Repairs which is profile related and will be
refined.
The forecast underspend is on condition surveys due
to favourable market conditions and good procurement
Supplies and
Services
10,325 10,858 533 4.9% 15,178 15,103 75 0.5% The YTD underspend relates mainly to the current
budget profile of Schools Prepared Meals and
Educational Equipment budgets within the Education
Service as well as underspends on catering purchases
in Commercial Services. 
The forecast underspend due to lower than anticipated
spend on catering purchases partially offset by
overspends as a result of two bi-elections in the year.
Transport 339 256 (83) (32.4%) 352 352 0 0.0% The YTD overspend is due to small overspends within
staff travel budgets across all Services, this overspend
will be closely monitored. 
Third Party 36,622 35,889 (733) (2.0%) 46,605 47,326 (721) (1.6%) The YTD overspend is mainly due to the timing of
invoices within NPDO and Hub Schools and the
reported budget pressure within the Schools
Residential Budget.  
Income (22,587) (21,972) 615 (2.8%) (31,894) (32,004) 110 (0.3%) The YTD position is mainly due to over-recovery of
income within Legal and Regulatory Services. The
YTD over-recovery in NPDO Schools is mainly profile-
related and will be refined and the remainder is due to
receipt of historic water refunds. The YTD over-
recovery of income for Licence Fees will remain and
be adjusted for at year-end. 
Totals 111,006 108,955 (2,051) (1.9%) 149,852 150,093 (241) (0.2%)

Page 30

YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. 
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 31

EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – RED VARIANCES AS AT 31 DECEMBER 2024
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Education - Pupil Support  4,113 4,914 (801) (19.5%) Higher than budgeted demand for placements within
Residential Schools.
Education - Schools - Central Services 2,401 2,156 245 10.2% Recruitment delays within 100 day Promise Budget 
Commercial Services - Central/Management Costs 1,721 1,621 100 5.8% Lower than anticipated spend in Catering Purchases
Commercial Services - Property Services 848 798 50 5.9% Condition Surveys Budget - Market Conditions more
favourable through effective procurement.
Legal and Regulatory Support - NPDO 16,947 16,837 110 0.6% One off receipt of historic water refunds.
Education - Primary Education 41,055 40,975 80 0.2% Lower than anticipated spend on Universal Free School
Meals 
A red variance is a forecast variance which is greater than +/- £50,000.

Page 32

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – AS AT 31 DECEMBER 2024 
The department has a forecast overspend of £1.610m (2.8%). This is due to increased bus contract renewal costs for Public and Pupil
Transport across Argyll and Bute, additional costs relating to repairs to the Belnahua Ferry, the Transport of ASN pupils, Temporary
Accommodation and two unrealised savings for additional income from Traffic Regulation Orders (TB13b) and Stadiums (TB12b).  These
overspends are partially offset by additional income in Waste, a reduction in Landfill Tax costs due to reduced tonnage levels in Helensburgh
Waste Disposal and vacancy savings across the department. 
The department has a year to date overspend of £5.165m (12.4%). This is mainly due to the profile of a number of budgets across the
department, mainly with Roads & Lighting and Marine.   
Forecast Outturn Position 
Service Annual
Budget 
£000
Forecast
Outturn 
£000
Current
Forecast
Variance
(Dec)
£000
Previous
Forecast
Variance
Reported
to P&R
(Oct) 
£000
Change 
£000
Executive Director
(Kirsty Flanagan) 89 (11) 100 100 0
Head of Customer
Support Services
8,825 8,809 16 16 0
Head of
Development and
Economic Growth 8,937 9,111 (174) (174) 0
Head of Financial
Services 6,988 6,988 0 0 0
Head of Roads
and Infrastructure
Services 33,342 34,894 (1,552) (1,552) 0
Totals 58,181 59,791 (1,610) (1,610) 0 
Year to Date Position 
0%
25%
50%
75%
100%
Executive
Director (Kirsty
Flanagan)
Head of
Customer
Support
Services
Head of
Development
and Economic
Growth
Head of
Financial
Services
Head of Roads
and
Infrastructure
Services
Expenditure to date against the remaining budget for each
Service
YTD
Actual
£000
Remaining Budget
£000

Page 33

Key Financial Successes:
The department had a challenging 2023-24 financial year with few financial successes largely due to the Weather Incident in October creating
substantial pressures as well as reduced income due to numerous ferry cancellations at our Piers & Harbours. 
Key Financial Challenges: Proposed Actions to address Financial Challenges:
Ensuring that services spend to budget and do not overspend after the
department had an overspend of £1.3m after automatic earmarkings in
2023-24.
Detailed monitoring in the key areas overspent in 2023-24 to flag up
concerns early and mitigate before becoming an overspend. 
Department / Service ongoing ability to meet future savings / efficiency
requirements.
Monitoring of trends / expenditure levels / service configuration and
the Service Packages Policy Options savings process.
Rising cost of materials, software and consultancy services across the
service will result in a reduction in activity or overspends.
Costs are monitored regularly and contained as much as possible
with any unavoidable overspends highlighted as soon as known.
Financial Services to continue to deliver a high-quality support service
function during a time of substantial uncertainty and challenge arising from
continuing reductions in funding whilst costs are increasing due to ongoing
high levels of inflation and service demand caused by world events.
Ensure the team is operating as efficiently and effectively as
possible by building resilience across the team and working
collaboratively with other services of the Council to support
evidence-based decision making. 
Winter Maintenance costs are difficult to estimate as they are very much
dependant on the weather. 
Close monitoring of Winter Maintenance activity and reporting of the
financial implications through the budget monitoring process. The
Council agreed the winter policy, setting out the intervention level
and locations to be treated. The number of treatments is determined
by weather conditions. The current budget provision provides for 56
full equivalent runs. There is a sophisticated weather monitoring
system in place consisting of several weather stations, this is
supported by a forecasting and meteorological service which is
collaboratively procured by West of Scotland local authorities.
Climate Change Mitigation impacting on the departments key
infrastructure due to increased inspection regimes will result in
overspends.
The Council will continue to tackle climate change, looking at
financially sustainable options and will closely monitor the financial
consequences.

Page 34

Dangerous buildings costs as there is no budget for this expenditure and
the council has no control over the demand for the service.
Building Standards, Legal Services and Financial Services are
working closely to manage debt recovery and to consider other
options to minimise corporate risk exposure. 
Ferry Grant from Transport Scotland has stayed the same for 2024-25
despite increased costs for employee inflation as well as other general
inflationary increases.
Costs are monitored regularly and contained as much as possible
with any unavoidable overspends highlighted as soon as known.
Due to the nature of the various components of Waste Management there
are ongoing challenges with:
• The introduction of the Deposit Return Scheme.
• Uncertainty with recycling income/ gate fee costs due to the           
volatility of the market.
• Challenges in the legislative changes around the disposal of      
Biodegradable Municipal Waste.
• The Circular Economy Bill that has recently been passed and the
implications that may bring. 
To closely monitor all service components of Waste Management
and review the Waste Strategy in conjunction with our contractual
partner Renewi (previously Shanks).

Page 35

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 31 DECEMBER 2024
Service
Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Executive
Director (Kirsty
Flanagan)
Central/Management
Costs
235 214 (21) (9.8%) 89 (11) 100 112.4% Forecast variance due to a
projected over-recovery of
vacancy savings.
235 214 (21) (9.8%) 89 (11) 100 112.4%
Head of
Customer
Support Services
Central/Management
Costs
104 120 16 13.3% 167 167 0 0.0% YTD underspend due to the
timing of cash flows in 
comparison to the profiling of
budget and will be rectified over
the financial year. 
Head of
Customer
Support Services
Communications 253 246 (7) (2.9%) 339 339 0 0.0% Outwith reporting criteria
Head of
Customer
Support Services
Customer Service
Centres
1,191 1,128 (63) (5.6%) 1,590 1,590 0 0.0% YTD overspend due to the
timing of cash flows in 
comparison to the profiling of
budget and will be rectified over
the financial year. 
Head of
Customer
Support Services
HR 2,105 1,869 (236) (12.6%) 2,386 2,370 16 0.7% YTD overspend due to costs for
the iTrent project that need to be
drawn down from earmarked
reserves.
Forecast variance due to
underspend in Organisational
Development.
Head of
Customer
Support Services
ICT 3,301 3,295 (6) (0.2%) 4,368 4,368 0 0.0% Outwith reporting criteria
Head of
Customer
Support Services
Registrars (3) (41) (38) 92.7% (25) (25) 0 0.0% YTD overspend due to the
timing of cash flows in 
comparison to the profiling of
budget and will be rectified over
the financial year. 
6,951 6,617 (334) (5.1%) 8,825 8,809 16 0.2%
Head of
Development &
Economic Growth
Airports 1,005 948 (57) (6.0%) 1,186 1,186 0 0.0% YTD overspend due to the
timing of cash flows in 
comparison to the profiling of

Page 36

budget and will be rectified over
the financial year. 
Head of
Development &
Economic Growth
Building Control (203) (170) 33 (19.4%) (140) (140) 0 0.0% YTD underspend due to the
timing of cash flows in 
comparison to the profiling of
budget and will be rectified over
the financial year. 
Head of
Development &
Economic Growth
Central/Management
Costs
396 391 (5) (1.3%) 570 570 0 0.0% Outwith reporting criteria
Head of
Development &
Economic Growth
Culture & Heritage 151 179 28 15.6% 250 250 0 0.0% YTD underspend due to the
timing of cash flows in 
comparison to the profiling of
budget and will be rectified over
the financial year. 
Head of
Development &
Economic Growth
Development
Management
30 (24) (54) 225.0% 115 115 0 0.0% YTD overspend due to the
timing of cash flows in 
comparison to the profiling of
budget and will be rectified over
the financial year. 
Head of
Development &
Economic Growth
Development Policy 279 308 29 9.4% 451 451 0 0.0% Outwith reporting criteria
Head of
Development &
Economic Growth
Economic
Development
335 2,076 1,741 83.9% 2,178 2,178 0 0.0% YTD underspend due to grant
income received that has not yet
been spent and will be rectified
over the financial year. 
Head of
Development &
Economic Growth
Environmental
Health
788 833 45 5.4% 1,230 1,230 0 0.0% Outwith reporting criteria
Head of
Development &
Economic Growth
Environmental
Initiatives
59 57 (2) (3.5%) 93 93 0 0.0% Outwith reporting criteria
Head of
Development &
Economic Growth
Housing 3,644 2,978 (666) (22.4%) 2,714 2,888 (174) (6.4%) YTD overspend due to
earmarked reserve draw down
being needed to fund
expenditure in the Strategic
Housing Fund not being
completed.
Forecast overspend reported
due to increased Temporary

Page 37

Accommodation and
maintenance costs.
Head of
Development &
Economic Growth
Private Landlords (219) (11) 208 (1890.9%) 0 0 0 0.0% YTD underspend is due to timing
of Short Term Let income which
will be rectified over the coming
months with any surplus being
earmarked at the end of the
year.
Head of
Development &
Economic Growth
Transportation
Policy
131 218 87 39.9% 290 290 0 0.0% YTD underspend due to profile
of income which will be rectified
over the financial year. 
6,396 7,783 1,387 17.8% 8,937 9,111 (174) (1.9%)  
Head of Financial
Services
Accounting &
Budgeting
1,849 1,825 (24) (1.3%) 2,566 2,566 0 0.0% Outwith reporting criteria
Head of Financial
Services
Internal Audit &
Fraud
234 248 14 5.7% 332 332 0 0.0% Outwith reporting criteria
Head of Financial
Services
Revenues & Benefits 4,856 4,913 57 1.2% 3,155 3,155 0 0.0% YTD underspend due to the
timing of cash flows in 
comparison to the profiling of
budget and will be rectified over
the financial year. 
Head of Financial
Services
Scottish Welfare
Fund
534 560 26 4.6% 935 935 0 0.0% Outwith reporting criteria    
7,473 7,546 73 1.0% 6,988 6,988 0 0.0%  
Head of Roads &
Infrastructure
Services
Amenity 3,114 2,939 (175) (6.0%) 3,215 3,240 (25) (0.8%) YTD overspend mainly due to
Maintenance cost across Parks
within Bute and Cowal which
can hopefully be covered by
underspends elsewhere, further
information will be provided at
next update. 
Forecast variance due to
additional vehicle costs.
Head of Roads &
Infrastructure
Services
Car Parking (588) (464) 124 (26.7%) (601) (601) 0 0.0% YTD underspend due to the
timing of cash flows in 
comparison to the profiling of
budget and will be rectified over
the financial year.

Page 38

Head of Roads &
Infrastructure
Services
Central/Management
Costs
2,393 2,206 (187) (8.5%) 2,698 2,662 36 1.3% YTD overspend due to the
timing of cash flows in 
comparison to the profiling of
budget and will be rectified over
the financial year. 
Forecast underspend due to
delay in Route Optimisation
project, this is partially offset
against additional vehicle costs.
Head of Roads &
Infrastructure
Services
Depots 386 384 (2) (0.5%) (313) (313) 0 0.0% Outwith reporting criteria
Head of Roads &
Infrastructure
Services
Fleet & Transport 8,014 6,358 (1,656) (26.1%) 8,668 10,255 (1,587) (18.3%) YTD overspend due to
increased internal fleet 
maintenance costs and
increased bus contracts costs
for Public Transport and Pupil
Transport. 
Forecast overspend reported
due to increased contract costs
for Public & Pupil Transport as
well as increased costs for
Internal Pupil Transport.
Head of Roads &
Infrastructure
Services
Infrastructure 407 489 82 16.8% 725 725 0 0.0% YTD underspend due to the
timing of cash flows in 
comparison to the profiling of
budget and will be rectified over
the financial year. 
Head of Roads &
Infrastructure
Services
Marine (2,882) (4,124) (1,242) 30.1% (3,810) (3,560) (250) 6.6% YTD overspend due to additional
costs for Ferry maintenance and
timing of income.
Forecast overspend for
additional maintenance costs for
Luing and Jura Ferries.
Head of Roads &
Infrastructure
Services
Network & Traffic
Management
189 42 (147) (350.0%) 109 209 (100) (91.7%) YTD overspend due to shortfall
in income for Traffic Regulation
Orders.
Forecast overspend for an
unrealised saving for additional
income from Traffic Regulation
Orders.

Page 39

Head of Roads &
Infrastructure
Services
Road Safety 81 143 62 43.4% 147 147 0 0.0% YTD underspend due to the
timing of cash flows in 
comparison to the profiling of
budget and will be rectified over
the financial year. 
Head of Roads &
Infrastructure
Services
Roads & Lighting 7,507 4,158 (3,349) (80.5%) 7,699 7,703 (4) (0.1%) YTD overspend due to the
profile of internal recharge
budget within the Roads and
Lighting Holding account, which
will be rectified over the financial
year.
Forecast overspend due to
increased employee recharges.
Head of Roads &
Infrastructure
Services
Waste 8,789 9,009 220 2.4% 14,805 14,427 378 2.6% Underspend due to reduction in
Landfill Tax costs due to
reduction in tonnage levels in
Helensburgh resulting in
underspends alongside
additional recyclate and 
commercial refuse income.    
27,410 21,140 (6,270) (29.7%) 33,342 34,894 (1,552) (4.7%)      
48,465 43,300 (5,165) (11.9%) 58,181 59,791 (1,610) (2.8%)   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. 
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 40

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – SUBJECTIVE SUMMARY AS AT 31 DECEMBER 2024
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 30,912 30,142 (770) (2.6%) 43,367 43,651 (284) (0.7%) YTD overspend due to payment of backdated pay arrears
and the budget not being realigned which will be rectified by
the end of the financial year as well as agency staff that will
be covered with the draw down of earmarked reserves.
Premises 2,587 2,672 85 3.2% 4,075 4,115 (40) (1.0%) YTD underspend mainly due to the profile of the Depot
recharge which will be rectified by end of the financial year. 
Forecast overspend due additional housing maintenance
costs.
Supplies
and
Services
9,324 7,963 (1,361) (17.1%) 10,979 10,961 18 0.2% YTD overspend mainly due to expenditure incurred in
Economic Development which will be funded from grant
income as well as the profile of budget across a number of
services which should be rectified by end of the financial
year. 
Forecast underspend due to delay in Route Optimisation
project partially offset by additional housing maintenance
costs.
Transport 10,730 8,884 (1,846) (20.8%) 16,900 17,352 (452) (2.7%) YTD overspend due to additional costs for ferry and vehicle
maintenance costs as well as additional Fleet and Roads
Maintenance costs that will be offset with additional income 
from recharges to other services/capital. 
Forecast overspend for additional maintenance costs for
Luing and Jura Ferries, increased Pupil Transport costs and
vehicle maintenance costs across Amenity and Waste.
Third Party 51,541 50,847 (694) (1.4%) 71,148 72,080 (932) (1.3%) YTD overspend mainly due to grant payments within
Economic Development and Housing that either have or will
be offset with grant income once received as well as external
contractor costs within Roads that are covered by additional
income, these are offset by Benefit Payment underspends
which are offset with reduced income. 
Forecast overspend due to increased contract costs for
Public Transport and additional Temporary Accommodation
costs in Housing.

Page 41

Capital
Financing
0 0 0 0.0% 2,677 2,677 0 0.0% Outwith reporting criteria
Income (56,629) (57,208) (579) 1.0% (90,965) (91,045) 80 (0.1%) YTD overspend mainly due to a reduction in Benefit Income
which will be offset with reduced Benefit Payments and the
profile of recharges within the Roads Operational Holding
Account which will be rectified over the financial year; these
are partially offset with grant income received within
Economic Development and Housing to cover expenditure
incurred within Third party Payments. 
Forecast underspend reported as there is a reduction in
Landfill Tax costs due to reduction in tonnage levels in
Helensburgh alongside additional recylate and commercial
refuse income which is partially offset against two unrealised
savings for additional income from Traffic Regulation Orders
(TB13b) and Stadiums (TB12b).
Totals 48,465 43,300 (5,165) (11.9%) 58,181 59,791 (1,610) (2.8%)   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. 
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 42

EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – RED VARIANCES AS AT 31 DECEMBER 2024 
Service Area
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Public Transport 5,266 6,353 (1,087) (20.6%) New bus contracts in place for Public and
Pupil Transport. 
Pupil Transport - Internal 1,461 1,961 (500) (34.2%) Increased costs for transporting ASN pupils.
Ferries 160 410 (250) (156.3%) Maintenance costs for Luing and Jura
ferries.
Traffic Regulation Orders (150) (50) (100) 66.7% Unrealised saving for additional income from
Traffic Regulation Orders.
Housing 742 846 (104) (14.0%) Increased costs for B&B usage for
Temporary Accommodation.
Vacancy Savings (428) (528) 100 (23.4%)  Projected over-recovery of vacancy
savings.
Waste Income (2,324) (2,504) 180 (7.7%)  Additional recyclate income.
Waste Disposal 1,989 1,756 233 11.7% Reduction in Landfill Tax costs due to
reduction in tonnage levels in Helensburgh 
A red variance is a forecast variance which is greater than +/- £50,000.

Page 43

SOCIAL WORK – AS AT 31 DECEMBER 2024 
The department is currently forecasting an overspend of £2.179M (2.8%). This is due to demand for residential placements within Children and
Families and Older People Services. 
The department has a year-to-date overspend of £0.699m (1.4%) which again is due to demand driven services within Children and Families
and Older People. 
Forecast Outturn Position 
Service Annual
Budget
£000
Forecast
Outturn
£000
Current
Forecast
Variance
(Dec)
£000
Previous
Forecast
Variance
Reported
to P&R
(Oct)
£000
Change
£000
Chief Officer Integration (1,261) (1,011) (250) (254) 4
Head of Strategic Planning
and Performance 453 456 (3) 0 (3)
Head of Health and
Community Care 41,607 43,452 (1,845) (1,890) 45
Head of Acute and
Complex Care 21,216 21,116 100 314 (214)
Head of Children and
Families 15,224 15,405 (181) (219) 38
Totals 77,239 79,418 (2,179) (2,049) (130)
Year to Date Position 
Key Financial Successes: 
Delivered a balanced budget at the end of 2023/24 after utilising £1.826m of reserves. An additional amount of £0.209m was transferred to IJB
reserves and should allow for future investment and transformation across Social Work. 
-115%
-90%
-65%
-40%
-15%
10%
35%
60%
85%
110%
Chief Officer
Integration
Head of Adult
Services
Head of Children
and Families
Head of Strategic
Planning and
Performance
Expenditure to date against the remaining budget for
each Service
YTD
Actual
£000
Remaining Budget
£000

Page 44

Key Financial Challenges: Proposed Actions to address Financial Challenges:
Deliver the outstanding savings total for 2024/25 of £0.993m (as at
September 2024).
Maintain a close working relationship with the HSCP Service
Improvement Team to quickly and efficiently identify and assess
options for delivering the outstanding savings. 
Development and delivery of future service redesigns which will be
necessary to contain service expenditure within the allocated resource,
noting that in year savings still need to be identified for 24/25 to address
the 24/25 budget gap, as well as budget gaps in future years. 
Support from finance to assist strategic managers to develop and
identify further savings and to look beyond the short term to identify
and plan the changes which will be needed to address the expected
ongoing budget challenges over the current, and future, years.
Use of agency staff to support service delivery across Social Work, but
particularly in Older People services, due to recruitment and retention
challenges within the service. Year to date spend at August 2024 of £1.9m. 
Close working relationship with the HSCP to support the costing of
a plan to stabilise the service and ensure it is operationally and
financially sustainable. This includes an exit plan from the reliance
on agency staff. 
Cost of living crisis affecting pay inflation negotiations and financial
sustainability of service providers, which could affect affordability and
sustainability of service delivery. 
Ensure emerging issues are highlighted as soon as possible so that
the financial impact can be evaluated and reported through the
budget monitoring and preparation processes.

Page 45

SOCIAL WORK – OBJECTIVE SUMMARY AS AT 31 DECEMBER 2024
Service Service Area
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Chief Officer
Integration
Integration
Headquarters
267 249 (18) (7.2%) 596 606 (10) (1.7%) Outwith reporting criteria.
Chief Officer
Integration
Social Work
Central
Support
(125) (512) (387) 75.6% (1,857) (1,617) (240) 12.9% The YTD variance is due to the under
recovery of vacancy savings partially offset by
spend on agency staff and charges from
housing services and a termination payment
due to a senior officer leaving their substantive
post.  The forecast variance reflects an under
recovery in vacancy savings due to either
posts being filled or cost centres not open for
savings due to agency costs being incurred.
This under recovery is partially offset by
agency costs being incurred,charges from
housing services and a termination payment
due to a senior officer leaving their substantive
post.    
142 (263) (405) 68.4% (1,261) (1,011) (250) 11.2%  
Head of
Strategic
Planning &
Performance
Management
& Central
Costs
286 281 (5) (1.8%) 421 426 (5) (1.2%) Outwith reporting criteria.
Head of
Strategic
Planning &
Performance
Service
Development
21 21 0 0.0% 32 30 2 6.3% Outwith reporting criteria.    
307 302 (5) (1.8%) 453 456 (3) 5.1%  
Head of
Health and
Community
Care
Management
& Central
Costs
358 333 (25) (7.5%) 582 589 (7) (1.2%) Outwith reporting criteria.
Head of
Health and
Community
Care
Older People 26,269 25,909 (360) (1.4%) 41,025 42,863 (1,838) (4.5%) The YTD and forecast overspends are due to
the current demand for care packages and the
increasing reliance on agency staff to cover
sickness and vacancies along with an
increase in payments to third party providers.    
26,627 26,242 (385) (1.5%) 41,607 43,452 (1,845) (4.4%)

Page 46

Head of
Acute and
Complex
Care
Learning
Disabilities
8,166 8,690 524 6.0% 14,989 14,710 279 1.9% The YTD underspend is due to timing
differences on charges to health boards and
other income lines. The forecast underspend
reflects the current demand for LD services.
Head of
Acute and
Complex
Care
Management
& Central
Costs
55 83 28 33.7% 128 92 36 28.1% The YTD and forecast underspends are based
on current projected requirement for training
and supplies and services costs.
Head of
Acute and
Complex
Care
Mental Health 2,004 1,699 (305) (18.0%) 3,001 3,362 (361) (12.0%) The YTD variance is due to unbudgeted
agency costs, timing differences on charges to
health boards and increased demand for
residential placements.  The forecast
overspend is based on current demand for the
service and re-assessments of care packages
and unbudgeted agency costs.
Head of
Acute and
Complex
Care
Physical
Disability
1,901 2,112 211 10.0% 3,098 2,952 146 4.7% The YTD and forecast underspends are due to
some care packages ending and others being
re-assessed.    
12,126 12,584 458 31.8% 21,216 21,116 100 22.7%  
Head of
Children &
Families
Child
Protection
2,247 2,379 132 5.6% 3,602 3,431 171 4.7% The YTD variance is based on known
demands for the service coupled with deferred
income received from previous years. The
forecast underspend is as a result of demand
for contact and welfare services and deferred
income in the area teams budget lines.
Head of
Children &
Families
Children with
a Disability
654 783 129 16.5% 1,036 833 203 19.6% The YTD variance is based on two third
sectors grants ending. The forecast
underspend reflects a reduction in third sector
grants payable to external organisations, one
of which may re-start before then end of the
financial year.
Head of
Children &
Families
Criminal
Justice
251 122 (129) (105.7%) 174 77 97 55.7% The YTD variance is due to additional grant
funding. The forecast underspend reflects
additional grant funding received along with
vacant posts.
Head of
Children &
Families
Looked After
Children
5,322 4,837 (485) (10.0%) 6,679 7,366 (687) (10.3%) The YTD variance is due to a retainer
payment being required for 4 weeks for 2
children transitioning from secure to residential
placements along with a rates increase agreed
by Scotland Excel and a change in the split of
the funding for one package. The forecast
overspend reflects current known demand for

Page 47

the service.  Currently have 18 children in
residential placements with an average cost of
£132k per annum and potentially more  under
consideration along with an overspend on staff
costs due to a re-grading process partially
offset by underspends in Adoption and
Fostering. 
Head of
Children &
Families
Management
& Central
Costs
2,355 2,346 (9) (0.4%) 3,733 3,698 35 0.9% Outwith reporting criteria.
10,829 10,467 (362) (3.5%) 15,224 15,405 (181) (1.2%)
GRAND
TOTAL 50,031 49,332 (699) (1.4%) 77,239 79,418 (2,179) (2.8%)
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.
Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. 
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 48

SOCIAL WORK – SUBJECTIVE SUMMARY AS AT 31 DECEMBER 2024 
Subjective
Category
YTD
Actual
£000
YTD
Budget
£000
YTD
Variance
£000
%
Variance
Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Employee 26,347 23,432 (2,915) (12.4%) 33,537 36,184 (2,647) (7.9%) Both the YTD and forecast overspend is due
to the use of agency staff across the HSCP
partially offset by payroll underspends due to
vacancies. 
Premises 1,065 1,007 (58) (5.8%) 1,584 1,646 (62) (3.9%) The YTD overspend and forecast overspend
are mainly due to overspends on utilities,
central repairs and property maintenance. 
Supplies &
Services
1,496 1,421 (75) (5.3%) 1,045 1,307 (262) (25.1%) The YTD and forecast overspend are largely
due to the timing of payments relating to the
purchase of computer software and the
purchase of small tools and equipment.
Transport 497 477 (20) (4.2%) 616 654 (38) (6.2%) The YTD and forecast variance are outwith
the reporting criteria.
Third Party 42,885 44,513 1,628 3.7% 64,814 66,014 (1,200) (1.9%) The YTD and forecast variance are due to
demand for purchased care services across
both Childrens and Adult Services.
Income (22,259) (21,518) 741 (3.4%) (24,357) (26,387) 2,030 (8.3%) The YTD and forecast over recovery of
income is mainly due to increased income
from fees, charges and recharges.
Totals 50,031 49,332 (699) (1.4%) 77,239 79,418 (2,179) (2.8%)   
YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far.

Page 49

Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. 
The Variance is the difference between budget and actual or forecast outturn.
A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget.
A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less
than budget.
An explanation is given for any variance which exceeds £50,000 or 10%.

Page 50

SOCIAL WORK – RED VARIANCES AS AT 31 DECEMBER 2024
Service Area Annual
Budget
£000
Forecast
Outturn
£000
Forecast
Variance
£000
%
Variance Explanation
Social Work Central Support (1,857) (1,617) (240) 12.9%
The forecast variance reflects an under recovery in vacancy savings due to either posts
being filled or cost centres not open for savings due to agency costs being incurred. This
under recovery is partially offset by agency costs being incurred, charges from housing
services and a termination payment due to a senior officer leaving their substantive post.
Looked After Children 6,679 7,366 (687) (10.3%)
The forecast overspend reflects current known demand for the service.  Currently have 18
children in residential placements with an average cost of £132k per annum and potentially
more under consideration along with an overspend on staff costs due to a re-grading
process partially offset by underspends in Adoption and Fostering. 
Children with a Disability 1,036 833 203 19.6% The forecast underspend reflects a reduction in third sector grants payable to external
organisations, one of which may re-start before then end of the financial year.
Child Protection 3,602 3,431 171 4.7% The forecast underspend is as a result of demand for contact and welfare services and
deferred income in the area teams budget lines.
Criminal Justice 174 77 97 55.7% The forecast underspend reflects additional grant funding received and vacant posts.
Older People 41,025 42,863 (1,838) (4.5%) The forecast variance reflects the current demand for care packages, the cost of agency
staff and payments to third party providers.
Physical Disability 3,098 2,952 146 4.7% The forecast underspend is due to a combination of re-assessed needs packages and some
care packages ending.
Learning Disability 14,989 14,710 279 1.9% The forecast underspend reflects the current demand for LD services.
Mental Health 3,001 3,362 (361) (12.0%)
The forecast overspend is based on current demand for the service and re-assessments of
care packages and unbudgeted agency costs.
A red variance is a forecast variance which is greater than +/- £50,000.

Page 51

MONITORING OF SAVINGS – AS AT 31 DECEMBER 2024
New policy savings were identified for the three year period 2024-25 to 2026-27 and these were agreed by Council in February 2024.  Council
agreed to policy savings of £0.665m on a recurring basis. 
The position of historical policy saving options is as follows:
- 2023/24 – those not delivered or that have further increases in value in 2024-25 onwards total £5.387m
- 2022/23 – those not delivered or that have further increases in value in 2024-25 onwards total £0.170m
- 2021/22 – those not delivered total £0.041m
- 2020/21 – all delivered
- 2019/20 – all delivered
- 2018/19 - those not delivered total £0.204m
The 2024-25 savings have been removed from departmental budgets, however, it is important to monitor whether the saving has actually been
delivered to ensure that costs are not continuing resulting in an overspend by the end of the year.  It is also important to ensure that any
preparatory work required to deliver savings in future years is on track. 
There is two savings where the department has indicated it will not be achieved in full as summarised below:
Saving Saving
Agreed
Status Detail Shortfall/
Delayed
Value
TB13b Roads and
Amenity Services
charging (non-statutory
services)
Feb-18 Will not be achieved in
full.
The original proposal was to introduce charges for providing lighting
design and increase charges by 20% for road construction consents,
skips, scaffolds, hoarding, permits and licences. Whilst some
additional income has been generated through third party works,
opportunities are expected to be limited over the foreseeable future
due to staff shortages and other competing demands.   
A cost pressure will be added to the 2025-26 budget for this shortfall
and the service will look at other potential savings as part of the RIS
Review.
£100,000

Page 52

TB12b Stadiums Feb-18 Will not be achieved in
full.
The potential partnership relating to Mossfield has not materialised. 
More clubs are now using the all weather facilities and this has had
an impact on Council income, therefore it is unlikely the full saving
will ever be achieved.   
A cost pressure will be added to the 2025-26 budget for this shortfall
and the service will look at other potential savings as part of the RIS
Review.
£20,000 
All policy saving options previously agreed are noted in the table below for information.

Page 53

2024-25 2024-25
£000 FTE
Executive Director Douglas Hendry
CS01 Feb-22 Commercial
Services
Property Services Climate Change & Resource Efficiency 63.0 0.00 On Track to be Delivered
202425 008 Feb-24 Commercial
Services - Live
Argyll
Live Argyll 10%
reduction
10% reduction to the Management Fee
paid to Live Argyll Leisure Trust from the
Council.
363.00 0.0 Delivered
202425 011 Feb-24 Education Positive Starts Referrals to the Positive Starts support
scheme have been reducing year on year,
furthermore the Early Years team no
longer have capacity to quality assure and
administer this budget to a level where
they can ensure a positive impact for
children and families or best value in
relation to the service. Referrals come
form Health and Social Work, not
Education however the HSCP were not
willing to manage this budget.
40.0 0.00 Delivered
202425 009 Feb-24 Governance,
Risk and
Safety
Governance
Restructure
Reorganisation of Governance team and
remove posts that are currently vacant.
The proposed restructure will ensure
current level of service will be maintained.
62.00 2.5 On Track to be Delivered
Executive Director Kirsty Flanagan
DEG01 Feb-22 Development
and Economic
Growth
Economic Growth Crown Estate Administration Contribution
to Project Delivery
107.00 0.0 Delivered
FIS2324-001 Feb-23 Financial
Services
Treasury
Management
Service Concessions - Alteration to
accounting treatment to align the
repayment of borrowing relating to new
schools over their asset life.  Guidance
from Scottish Government now permits
this change of accounting treatment. 
Further detail will be provided to Council in
due course.
4,861.0 0.00 Delivered
FIS2324-002 Feb-23 Financial
Services
Revenues and
Benefits
The Service has identified savings
through rightsizing of budgets, an
organisational restructure with investment
in modern apprenticeships and temporary
staff designed to boost income from the
billing of additional local taxes and the
recovery of associated debt. In addition
efficiency savings from increased
productivity, increased levels of process
automation and moving more customers
to transact with the service over the
internet will allow previously outsourced
review works to be carried out internally.
466.00 3.0 On Track to be Delivered
R&I15 Feb-21 Roads and
Infrastructure
Roads and
Infrastructure
Emergency services support and fuel
provision from our fuel supplies
0.50 0.0 Still to be Implemented
202425 012 Feb-24 Roads and
Infrastructure
Roads and
Infrastructure
Services (RIS)
Review
A RIS Review was undertaken during
2023/24 and the implementation of the
outcomes will begin in 2024-25. It is
anticipated that further efficiency savings
will be achievable in future years but the
level of which are not known at this stage.
200.00 0.0 On Track to be Delivered
R&I09 Feb-21 Roads and
Infrastructure -
Operations
Roads and
Infrastructure -
Operations
Road inspections find and fix -  reduce
reactive work by proactivity. Moving to AI
technology as technology develops
40.00 1.0 On Track to be Delivered
RIS2324-001 Feb-23 Roads and
Infrastructure
Services
School Crossing
Patrollers
Support Communities to move to different
approaches to delivering School Crossing
Patrols through engagement with Parent
Council and Communities.
60.00 8.4 Delivered
TB13b Feb-18 Roads and
Infrastructure
Services
Roads and
Infrastructure
Services
Roads & Amenity Services charging (non-
statutory services)
100.0 0.00 Will not be achieved
TB13b Feb-18 Roads and
Infrastructure
Services
Roads and
Infrastructure
Services
Roads & Amenity Services charging (non-
statutory services)
50.0 0.00 On Track to be Delivered
TB12b Feb-18 Roads and
Infrastructure
Services
Amenity Services Review charges for stadiums to enable
improvement work
20.00 0.0 Will not be achieved
TB12b Feb-18 Roads and
Infrastructure
Services
Amenity Services Review charges for stadiums to enable
improvement work
10.00 0.0 On Track to be Delivered
TB09 Feb-18 Roads and
Infrastructure
Services
Public Conveniences Public Conveniences - Progress
sustainable models including turnstiles
and franchising; establish simpler asset
transfer process
24.00 0.0 On Track to be Delivered
TOTAL 6,466.5 14.9
Template Ref Saving
Agreed
Service Service Delivery
Area
Savings Option Status of Implementation

Page 54

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE
20 FEBRUARY 2025
FINANCIAL RISKS ANALYSIS 2024-25  
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to provide a summary of the known key
financial risks facing the council in 2024-25, as at 31 December 2024. 
1.2  A number of council wide financial risks, both revenue and capital, have been
identified, in addition to specific departmental or service risks.  For each
departmental risk, the potential annual financial impact has been quantified, and
the likelihood of the risk materialising assessed based on a standard risk matrix. 
1.3 There are 4 council wide revenue risks identified for 2024-25, with a potential
annual value totalling £2.583m, and with varying degrees of likelihood. 
1.4 There are currently 42 departmental risks, with a potential annual value totalling
£6.693m, of which 5 are categorised as ‘Likely’.   
1.5 Financial risks are monitored and reviewed on an ongoing basis, with actions put
in place to continue to mitigate or manage these risks.

Page 55

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
POLICY AND RESOURCES COMMITTEE
20 FEBRUARY 2025
FINANCIAL RISKS ANALYSIS 2024-25  
2. INTRODUCTION 
2.1 This report outlines the process and approach to financial risk assessment and
provides details of the known key financial risks facing the council in 2024-25, as
at 31 December 2024. 
3 DETAIL 
3.1 Introduction 
3.1.1 The council is currently in a period of significant financial challenge.  In developing
its budget to address both funding, and cost and demand pressures,
consideration is given to financial risk.  However, both existing and new or
emerging financial risks require to be monitored and reviewed on an ongoing
basis throughout the year, with actions put in place to mitigate or manage these
risks.  Risks that cannot be mitigated or managed may have a detrimental impact
on the financial position of the council. 
3.1.2 There are a number of risks that may impact income or expenditure across the
entire council.  These are identified as council wide risks.  In addition, specific
financial risks impacting each department or service of the council have been
considered.  These are identified as departmental/service risks.   
3.1.3 For each risk, the potential annual financial impact has been quantified and the
likelihood assessed based on the following standard risk matrix: 
1 – Remote
2 – Unlikely
3 – Possible
4 – Likely
5 – Almost Certain 
3.1.4 The Argyll and Bute Integrated Joint Board (IJB) with responsibility for Social
Work and a range of Health services was established and came into effect on 1
April 2016.  The IJB is responsible for financial and strategic oversight of these
services.  It is the responsibility of the IJB to consider the individual financial risks
associated with Integration Services and these risks are therefore not contained
within this report.  A council wide risk has been included in respect of the IJB
being unable to deliver the social care service within the budget allocated. 
3.2 Council Wide Risks 
Revenue

Page 56

3.2.1 There is continued volatility in utilities pricing and demand can also be subject to
unpredictable weather extremes.  A potential annual risk value equivalent to 10%
of the annual utilities budget provision is deemed reasonable.  This equates to
£0.650m. 
3.2.2  The estimated level of Council Tax income is based on current and forecast Band
D equivalents, and reflects our expected collection rates, based on historical data. 
A potential annual risk value equivalent to 1% of the annual Council Tax income
budget is deemed reasonable.  This equates to £0.633m.    
3.2.3 In respect of the Health and Social Care Partnership (HSCP), it is the
responsibility of the Chief Officer and Chief Financial Officer to manage the HSCP
financial position.  If an overspend is forecast, a budget recovery plan will be
prepared and submitted to the IJB, Argyll and Bute Council and NHS Highland. 
Where recovery plans are unsuccessful and an overspend occurs at the financial
year end, and the HSCP has insufficient reserves to meet the overspend, then the
partners will be required to make additional payments to the HSCP.  Whilst any
additional payments by the council and NHS Highland will be deducted from
future years funding, there is a risk that the council may require to make an
additional unbudgeted contribution to the HSCP during the year.  As at 31
December 2024, the forecast outturn for 2024-25 on Social Work services was an
overspend of £2.179m.  The Chief Financial Officer of the IJB has now written to
the Council to request access to the Strathclyde Pension Fund Gain that is held in
reserves for the HSCP and, therefore, it is expected that Social Work will outturn
within budget, after applying these reserves.  However, there is a risk that the
level of overspend will increase beyond the level that can be managed through
available reserves.  A potential annual risk value of £0.500m is deemed
reasonable in this respect. 
3.2.4 There is an ongoing requirement to fund unavoidable inflationary cost increases in
across a number of areas such as, food and fuel. Inflation has been falling and
the Bank of England forecasts that it will continue to fall throughout the year.  This
position will continue to be closely monitored, with financial forecasts updated to
reflect information available on an ongoing basis.  A potential annual risk value
equivalent to 1% of relevant non-pay annual budgets is deemed reasonable.  This
equates to £0.800m. 
3.2.5  The council wide risks are summarised within the following table.   
Description Likelihood Assessed
Financial Impact
£000
Energy costs increase by 10% greater
than anticipated
3 650
1% variation in Council Tax Income 2 633

Page 57

IJB refer to Council for additional
funding to deliver social work services
3 500
1% variation in non-pay inflation  4 800
Total  2,583 
Capital  
3.2.6 The Local Government Finance Settlement announced on 19 December 2023
provided details of grant funding for 2024-25, proving certainty in respect of
General Capital Grant and available specific capital grant funding. 
3.2.7  The approved capital plan includes estimated capital receipts from asset sales of
£0.750m in 2024-25.  This is based on an assessment provided by the Special
Projects Team in January 2024.  A 10% variation from this estimate equates to
£0.075m, which would require to be managed within available resources.   
3.2.8  General feedback from Scotland Excel and council project managers indicates
that price increases and uncertainty continue to be experienced, as well as
disruptions to the supply chain and longer lead times, particularly in relation to the
construction sector and material availability.  The increased rate of inflation
impacts costs such as energy prices, labour, packaging and transport. These all
influence the overall contract price and make it extremely challenging to manage
the delivery of capital investment projects within available budgets and target
delivery timescales.  
3.2.9 While it has been possible to estimate the impact of these pressures on some
capital projects, and therefore either reflect those projections within the capital
monitoring report or adjust the capital programme accordingly, for others it is
more difficult, with no adverse forecast outturn projected at this stage.  It is,
therefore, deemed likely that there will be further significant financial impacts, not
yet reported, which may be challenging to manage within existing resources. 
3.3  Departmental/Service Risks 
3.3.1 The detail of each departmental financial risk is included within Appendix 1.  The
following table provides a summary of the number of risks within each
department, across each likelihood category, together with the potential annual
financial impact value. 
1 - Remote 2 - Unlikely 3 - Possible 4 - Likely 5 - Almost
Certain Total
No. £000 No. £000 No. £000 No. £000 No. £000 No. £000
Chief
Executive's
Unit
0 0 0 0 0 0 0 0 0 0 0 0

Page 58

Executive
Director
Douglas
Hendry 2 20 5 460 9 730 3 435 0 0 19 1,645
Executive
Director
Kirsty
Flanagan
4 285 2 140 15 4,373 2 250 0 0 23 5,048
Total 6 305 7 600 24 5,103 5 685 0 0 42 6,693 
3.3.2 The current top three risks in terms of the financial impact are noted in the table
below. 
SERVICE RISK TITLE DESCRIPTION LIKELIHOOD FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Roads
Maintenance –
Roads, Bridges,
Culverts & Sea
Defences
Extreme localised weather
may result in loss of road
access, bridges, culverts,
road or sea defence.
3 1,500
Roads and
Infrastructure
Services
Waste PPP -
Indexation
Historical payments made
towards Waste PPP based
on indexation rates have
been challenged by Renewi
resulting in a potential cost to
the council.
3 586
Financial
Services
Council Tax
Debt Collection
Recovery
Recovery of debt becomes
more difficult to pursue in the
current economic
climate.  This is in relation to
historical debt that has
accumulated over many
years therefore any adverse
collection rates will impact on
the year end debt provision
as opposed to the in-year
financial position, hence no
forecast variance has been
reported within the current
year.
3 345 
3.3.3 The risks which are likely, are noted below: 
SERVICE RISK TITLE DESCRIPTION LIKELIHOOD FINANCIAL
IMPACT
£000

Page 59

Council Wide
- Commercial
Services
Council Wide
Central Repairs
Increased demands on
central repair budgets (CRA)
due to a decrease in Capital
funding, increase in statutory
and emergency repairs and
increases in
supplier/contractor charges. 
This impacts on all
departments of the council
with a Central Repairs
Budget.
4 300
Development
and
Economic
Growth
Homelessness
Temporary
Accommodation
Income
Unpredictable number of
Homeless applications.
Inability to recover rent. 
Increase costs of property
maintenance and tenancy
change over.
4 150
Roads and
Infrastructure
Services
Fleet
Maintenance
Increased costs to maintain
internal fleet due to
inflationary increases on
vehicles parts.
4 100
Legal and
Regulatory
Support
NPDO –
Increase in
insurance costs
within NPDO
Schools
Increase in insurance costs
as a result of the long-term
effects of Covid-19 on the
insurance market and flood
claims.
4 75
Legal and
Regulatory
Support
Elections More than 1 by-election
required outwith standard
election cycle.
4 60 
3.4  Changes to Financial Risks 
3.4.1 The number of council wide risks has reduced from 7 to 4 since the previous
reporting period, due to confirmation of the 2024-25 pay awards, and progress on
the delivery of approved 2024-25 revenue budget savings options.  There have
been no changes to the departmental risks since last reporting.  
3.5 Monitoring of Financial Risks 
3.5.1  Financial risks are monitored and reviewed on an ongoing basis, with actions put
in place to continue to mitigate or manage these risks.  The updated position on
financial risks will continue to be regularly reported to committee.     
3.6 Future Years’ Risks

Page 60

3.6.1 Financial risks impacting 2025-26 and future years will be reported as part of the
2025-26 Budget Pack.    
4 CONCLUSION 
4.1 This report summarises the known key financial risks facing the council in 2024-
25.  There are 5 council wide risks and 42 departmental risks identified, with 5
categorised as ‘Likely’.  These risks are monitored and reviewed on an ongoing
basis, with actions put in place to continue to manage or mitigate the risks.   
5 IMPLICATIONS 
5.1 Policy - None.
5.2 Financial -  Outlines the potential annual value of financial risks 
5.3 Legal -  None.
5.4 HR -  None.
5.5 Fairer Scotland Duty - None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty -  None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  Provides details of financial risks 
5.8 Customer Service -  None. 
5.9 The Rights of the Child
(UNCRC) - 
None. 
Kirsty Flanagan
Executive Director/Section 95 Officer
17 January 2024 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
APPENDICES
Appendix 1 – Departmental/Service Financial Risks 
For further information contact Carolyn Earl, covering Head of Financial Services
Carolyn.Earl@argyll-bute.gov.uk

Page 61

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 31 DECEMBER 2024
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Commercial Services Catering Costs - Provision of
Meals to Early Years Children
The Children and Young People (Scotland) Act placed duties
on Councils to provide meals in an Early Years setting to
entitled children where sessions span over lunch time.  The
total quantum of grant funding is reducing and may not be
sufficient to fund the additional costs depending on uptake
and the additional costs to support the meal provision in
partner provider settings.
Joint strategy with procurement colleagues to reduce
potential impact of supplier charges.  Control food
wastage/portion controls.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Catering Purchases Increased supplier charges and higher than average inflation
on food costs.  In addition to this the Scottish Government
reviewed the regulations that govern the food and drinks
provided in schools and implemented revised regulations. 
The revised standards focus on reducing sugar, reducing red
processed meat and increasing fibre. Thus far, there has
been an increase in costs in produce and a reduction in
demand for school meals.
Joint strategy with procurement colleagues to reduce
potential impact of supplier charges.  Control food
wastage/portion controls; introduction of online ordering to
help manage food waste. Analysis and regular review of
menu choices.
2 100 2 100
Executive Director
Douglas Hendry
Commercial Services Catering - Implementation of
Universal Free School Meals in
Primary Schools for P6 and P7
pupils
The Scottish Government may not give the local authority
adequate funds to support the policy to expand free school
meals in primary schools to include P6 and P7 pupils (the
scheme has already been implemented for P1 to P5 pupils).
Additionally, In 2023-24 Special Schools and Learning
Centres received FSM to S6 Level.  Although expansion
paused for full implementation for P6&7, FSM will be
expanded through entitlement to Scottish Child Payment
and will be implemented in February 2025.
Senior Manager connected into the ASSIST FM Committee
and will continue to ensure the Council's viewpoint will be
considered.
0 0
Executive Director
Douglas Hendry
Commercial Services Rental Income from Properties Due to current economic climate, there may be reduced
ability to recover rental income from leased properties or
place suitable tenants in properties as leases come to an
end.
Management of leasehold properties by Estates team, any
issues with debt recovery being dealt with in line with
Council debt recovery policy.
2 60 2 60
Executive Director
Douglas Hendry
Commercial Services Surplus Properties Ongoing market difficulties lead to increased numbers of
surplus properties, in addition, as Our Modern Workspace
Project gains traction more properties will become surplus
to operational requirements. There are residual running
costs associated with all surplus properties.
One Council property team in place who will monitor market
conditions and work with prospective tenants/ purchasers to
let/sell surplus properties.
3 50 3 50
Executive Director
Douglas Hendry
Commercial Services Leisure Service Level
Agreements
Increase in RPI and/or other running costs (eg utilities,
payroll etc) resulting in requests for additional funding.
Monitoring annual alteration to contract RPI rate,
communication with service providers and mitigation
through financial forecasting and review of existing budget.
3 50 3 50
Executive Director
Douglas Hendry
Council Wide -
Commercial Services
Council Wide Central Repairs Increased demands on central repair budgets (CRA) due to a
decrease in Capital funding, increase in statutory and
emergency repairs and increases in supplier/contractor
charges.  This impacts on all departments of the Council with
a Central Repairs Budget.
Joint strategy with procurement colleagues to reduce
potential impact of supplier/contractor charges. Close
monitoring of central repairs budgets and commitments and
instructing only statutory tests/inspections and essential
repairs.
4 300 4 300
As at 31 October 2024 As at 31 December 2024

Page 62

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Education ASN Support Demand for ASN support continues to increase. Scottish
Government statistics suggest a 3% year on year increase,
resulting in an additional resource requirement. Particularly
where gaps in our enhanced provision exist. The medium-
term detriments on the development of young children
which occurred as a consequence of service closures during
the COVID pandemic have increased demands on the service
as children require additional support to catch up.  The
Additional Support for Learning National Implementation
plan continues to inform our strategic direction in line with
the Angela Morgan Review.
Service is currently looking at alternative options for service
delivery to mitigate the inescapable pressures. Continuing to
ensure robust assessment of needs, monthly monitoring of
budget, any delays in recruitment factored into projections
to enable informed decision making on allocation of funding
for new/amended /additional support packages. Following a
full ASN review, the service are currently investing in the
development of four new learning centres in order to
provide greater equity in meeting the more complex needs
of some learners as well as considering plans to develop
enhanced wellbeing resources across our learning estate in
future.  This aims to reduce the frequency of children having
to be educated in high cost out of area placements.
3 200 3 200
Executive Director
Douglas Hendry
Education Pre-Five Units - retention of
partner providers
Failure in the commissioning or retention of pre-five partner
provider units to deliver 1140 hours would result in an
increased pressure on the Council to deliver the service.
Annual financial appraisal; Support network; Short-term cash
injections.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Children and Young People
(Scotland) Act - ELC 1140 hours
The Council has been required to deliver 1140 hours of Early
Learning and Childcare since August 2021. The Scottish
Government has committed to funding this and the Council
has revised its service model to align it to the Scottish
Government's reduced funding profile.  A risk remains that
actual costs of delivery exceed the Government Grant in any
given year.  For example, if child numbers are higher than
estimated, this may require additional staffing which has not
been built included in the staffing model funded by Scottish
Government.   Scottish Government has included within
scope for this parliamentary session plans to further expand
on eligibility for 1140 hours to all 2 year olds and some one
year olds. As yet there has been no funding commitment.
However this will place unknown cost pressures on both our
capital and revenue budgets
Continuous monitoring and review of the service model,
usage and resources.
3 100 3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Education (Scotland) Act
The Education (Scotland) Act 2000 requires Councils to
undertake assessments of the need for the provision of
Gaelic Medium Primary Education (GMPE) and the duty to
support and promote Gaelic Education. This may lead to
additional staffing requirements depending upon the
demand for Gaelic from parents.
Continuous monitoring and review of the service model and
resources available within budget.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Hub DBDA/DBFM Schools  -
Litigation
Increased risk of the requirement to litigate to conclude final
capital contract payments due.
Monitoring claims and mitigation through robust challenge
of any additional claims.
2 150 2 150
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Contract RPI for NPDO and Hub
Schools
Increase in RPI would result in higher costs. Monitoring annual alteration to contract RPI rate and
mitigation through financial forecasting and review of
existing budget.
3 100 3 100

Page 63

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO - Increase in insurance
costs within NPDO Schools
Increase in insurance costs as a result of the long-term
effects of Covid-19 on the insurance market and flood
claims.
Monitoring annual alteration to contract insurance rate and
mitigation through financial forecasting and review of
existing budget.
4 75 4 75
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Elections More than 1 by-election required outwith standard election
cycle.
Outwith direct management control. 4 60 4 60
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services - Litigation Increased number of litigation cases. Ensure Legal Services are gateway to access all legal advice
and that advice is sought at earliest opportunity.
3 50 3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO/Hub DBFM contract
management efficiencies
Reduction in ability to generate contract management
efficiencies.
Monitoring annual efficiencies generated and mitigation
through robust contract management and application of
contract specifications / requirements.
2 50 2 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Licensing Reduced numbers of licensing applications leading to
reduced income.
Monitoring of trends and reporting the financial impact in
the budget monitoring.
3 30 3 30
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Children's Panel Increased number of referrals increasing costs through
increases in the running costs.
Maximise the use of council facilities/resources for panel
session in the first instance.
1 10 1 10
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services Failure to minimise Council wide use of external legal advice. Ensure legal services are gateway to access all legal advice. 1 10 1 10
Executive Director
Kirsty Flanagan
Customer Support
Services
Software Licences Potential risk of being under licensed for software which will
be identified via software audits which would incur
additional costs.
ICT security and compliance officer in post and duties include
review of systems to ensure fully licenced. 
2 100 2 100
Executive Director
Kirsty Flanagan
Customer Support
Services
Additional Bandwidth for
Education
Additional costs required to be incurred in relation to
additional bandwidth required to deliver the Education
Digital Strategy due to a more digitalised learning
curriculum.
Work closely with Education on Digital Devices for All
strategy to ensure necessary IT is in place.
3 50 3 50
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Homelessness Temporary
Accommodation Income
Unpredictable number of Homeless applications. Inability to
recover rent.  Increase costs of property maintenance and
tenancy change over.
Provision of Housing Options information and advice service
to minimise number of applicants proceeding to full
homeless application. Implementation of Rapid Rehousing
Plan.
4 150 4 150
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Dangerous Buildings
interventions
Building Standards having to deal with an increasing level of
dangerous building work which has significant financial
implications for Council.
Monitor activity and seek to recover costs from the owner. 3 100 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning Fee Penalties Potential that the Scottish Government may sanction
penalties due to poor performance by the Planning
Authority. The Scottish Government has recently appointed
a national Planning Performance Champion however the
detail of how this role intends to incentivise
improvement/penalise poor performance at a local
authority level remains unclear at this time
Maintain high levels of performance as articulated by
performance markers detailed in Planning Performance
Framework annual report.
1 100 1 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fee shortfalls Due to downturn in economic / building activity, in
particular renewable energy development and other major
developments could lead to planning fee income shortfalls
leading to revenue budget pressures.
Current income levels are looking more positive, however,
we are dependent on some high value applications coming
in which, if they don't materialise, will impact the overall
position.  Will continue to monitor Development
Management income and expenditure tightly and investigate
further income generation streams.
3 100 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Building Warrant fee shortfalls Due to loss of commercial income and downturn in
economic / building activity, building warrant fee income
shortfalls leading to revenue budget pressures.
Continue to monitor Building Standards income and
expenditure tightly and investigate further income
generation streams.
1 50 1 50

Page 64

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Environmental Health- export
certificates
Downturn in requests for export certificates as a result of UK
withdrawal from EU, changes to international trading
agreements or business economy. Reduction in demand
creates a budget pressure on environmental health budget.
Monitor income and resources required for export health
certificates / attestations required to support the export
market. Continue with food safety regulation activities
associated and support at 3rd country audits.  Pursue debt
rigorously with key customers through seeking regular
payments.
2 40 2 40
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Animal Health Carrying out livestock seizure to protect welfare of the
animals
Monitor activity and seek to recover costs from the disposal
of the animals.
1 10 1 10
Executive Director
Kirsty Flanagan
Financial Services Council Tax Debt Collection
Recovery
Recovery of debt becomes more difficult to pursue in the
current economic climate.  This is in relation to historical
debt that has accumulated over many years therefore any
adverse collection rates will impact on the year end debt
provision as opposed to the in-year financial position, hence
no forecast variance has been reported within the current
year.
Robust monitoring of arrangements with debt collection
agency and performance against target collection rates.
3 345 3 345
Executive Director
Kirsty Flanagan
Financial Services NDR Aleo Baseline Scottish Government are going to undertake a review the
current Arms Length External Organisations (ALEO) baseline
for 2024-25 which could increase the pressure on the
balance of costs vs relief.
Outwith direct management control. 3 316 3 316
Executive Director
Kirsty Flanagan
Financial Services Housing Benefit Subsidy Loss of Housing Benefit Subsidy due to exceeding LA error
threshold.
Processes in place for handling of claims accurately and
efficiently.
1 125 1 125
Executive Director
Kirsty Flanagan
Financial Services Sundry Debt Recovery Recovery of debt becomes more difficult to pursue in the
current economic climate. 
Additional staff are being put in place in the Sundry Debt
Team who will work jointly with Legal Services to enhance
the robustness of the Council's debt recovery processes.
3 85 3 85
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Roads Maintenance - Roads,
Bridges, Culverts & Sea
Defences
Extreme localised weather may result in loss of road access,
bridges, culverts, road or sea defence.
Routine inspections to deal with potential weak areas -
based on a stitch in time repair regime.
3 1,500 3 1,500
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Waste PPP - Indexation Historical payments made towards Waste PPP based on
indexation rates have been challenged by Renewi resulting
in a potential cost to the council.
Conversations are in place between Council and Renewi with
the aim of minimising the potential impact.
3 586 3 586
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Roads Maintenance - Roads
Network
Adverse weather conditions result in deterioration of the
road network necessitating greater spend on repair of
defects.
Manage maintenance budgets to ensure that spend is
prioritised to deal with safety defects.
3 230 3 230
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Car Parking Income Reduced number of visitors to the area and use of council
owned car parks resulting in a reduction in income.
Closely monitor income levels throughout the year,
especially in high visitor seasons.
3 200 3 200
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Piers & Harbours Income Changes to ferry services resulting in reduced berthing and
passenger income.
Closely monitor passenger number information coming from
CalMac to identify any emerging trends with reducing
passenger numbers.
3 200 3 200
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Waste - Compost Like Output
(CLO)
Compost Like Output is an element of waste that has been
heat treated and can only be used for landfill site
restoration. Renewi are currently producing more CLO than
we need and it is building up in our landfill sites - this has
been flagged up as a concern by SEPA and will need to be
removed.
Discussions ongoing with Renewi and the Council on steps
forward and what element the council is responsible for.
3 311 3 311
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Winter Maintenance Adverse weather conditions which require greater than
budgeted number of gritting runs.
Monitor weather conditions and apply gritting policy to
minimise costs.
3 150 3 150

Page 65

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Street Lighting Age of lighting stock requires greater maintenance as health
and safety becomes a consideration.
Manage maintenance budgets to ensure that spend is
prioritised to deal with safety defects.
3 100 3 100
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Ferry Services Grant from Transport Scotland covers the cost of running
the ferry services within Argyll and Bute which has not been
increased for 2024-25 which could result in additional costs
for the Council to fund the Ferry services.
Closely monitoring financial position throughout the year to
highlight any potential pressures.  Discussions will continue
to take place with Transport Scotland on an annual basis to
request additional funding that is required for that year.
3 100 3 100
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Fleet Maintenance Increased costs to maintain internal fleet due to inflationary
increases on vehicle parts.
Review of Fleet underway to determine where reductions
could possibly be made.
4 100 4 100
42 6,693 42 6,693

Page 66

ARGYLL AND BUTE COUNCIL  POLICY & RESOURCE COMMITTEE  
FINANCIAL SERVICES 20 FEBRUARY 2025 
CAPITAL BUDGET MONITORING REPORT – 31 DECEMBER 2024 
1.0 EXECUTIVE SUMMARY 
1.1 
1.2
This report provides an update on financial performance and the delivery of capital
projects against the approved Capital Plan budget resources and timescales as at 31
December 2024. 
A number of budget changes are proposed to reflect additional funding, the re-
profiling of expenditure and income across years, and to manage delivery of the
Capital Plan within available resources. 
1.3  Financial Position: 
• 2024-25 Forecast Outturn – Forecast net expenditure for the financial year
is £29.333m, compared to a profiled annual budget of £37.615m, giving rise
to a forecast underspend for the year of £8.282m (22.02%).  Actual net
expenditure of £23.679m has been incurred in the year to date, representing
81% of the net expenditure forecast for the year. 
• Total Capital Plan Forecast Outturn – Forecast outturn net expenditure on
the total Capital Plan is £203.116m, compared to a budget of £202.999m,
giving rise to a forecast overspend for the overall Capital Plan of £0.117m
(0.06%). 
1.4 Capital Plan Delivery: 
• Asset Sustainability – Of the 87 projects, there are currently 78 projects
(90%) on track, 6 projects (7%) off track but recoverable and 3 projects (3%)
off track.
• Service Development - Of the 43 projects, there are currently 41 projects
(95%) on track, 1 project (2%) off track but recoverable and 1 project (2%)
off track.
• Strategic Change – Of the 23 projects, there are currently 20 projects (87%)
on track and 3 projects (13%) off track.  
1.5  A number of known risks, specifically related to the delivery of the Capital Plan, are
documented within this report.  These risks may impact the delivery of the plan within
available resources and target timescales.  The monitoring and review of risks will
continue to be undertaken on an ongoing basis.

Page 67

ARGYLL AND BUTE COUNCIL  POLICY & RESOURCE COMMITTEE  
FINANCIAL SERVICES 20 FEBRUARY 2025 
CAPITAL BUDGET MONITORING REPORT – 31 DECEMBER 2024 
2.0  INTRODUCTION 
2.1 
2.2 
This monitoring report provides an update on financial performance and the delivery of
capital projects against the approved Capital Plan budget resources and timescales as
at 31 December 2024.   
It compares the forecast outturn for both the current year and the total plan across all
years, with the approved budget for each service and provides a profile of the probable
outturn over the years. Details of actual expenditure incurred during 2024-25 to date are
also provided. 
3.0  RECOMMENDATIONS 
3.1 
4.0 
4.1 
4.2 
4.3 
It is recommended that the Policy and Resources Committee note the contents of this
report and approve the proposed changes to the Capital Plan, as detailed within
Appendix 1. 
BUDGET CHANGES 
Previously Approved Budget Changes 
Following the decision at Policy and Resources Committee on 9 December 2021, the
Rothesay Pavilion project was put on pause, whilst potential funding options were being
considered. At the budget meeting in February 2023, additional funding was allocated
to this project, which will allow the project to progress towards successful delivery, by
supporting completion of certain work stages. Further funding was allocated at the
budget meeting in February 2024 for stages 2 and 3 to complete the project.  The
financial information included within this report now includes amounts relating to Phase
1, 2 and 3 of the Rothesay Pavilion project. 
Surveys have been completed in the council’s Learning Estates in relation to
RAAC, with only 1 building confirmed as having it present, with steps underway for its
removal. This will include a decant of the students for approximately 9 months, in
addition to total removal and replacement of the roof during 2024. Funding of £3m was
allocated as part of the 2024-25 budget setting process. Further, additional funding of
£0.406m has been allocated via the Capital Contract Increase Fund to meet the now
increased contract costs.  These spending commitments are reflected within the Capital
Plan. 
The council’s funding bid to the Scottish Government’s Learning Estate Investment
Programme (LEIP) for a new school campus on Mull was successful. At its meeting in
April 2024, Council agreed to commence the Business Case, undertake engagement,
commence site selection processes and establish governance arrangements. The
current Capital Plan does not provide for the potential delivery of a new school, beyond
this early planning stage.  Any future spending commitments and funding frameworks in
this respect will be subject to Council approval and will be built into the Capital Plan at
that point.

Page 68

4.4 
4.5 
4.6 
Proposed Budget Changes 
The table below shows proposed changes to Capital Plan gross expenditure, at
summary level, which include slippages, accelerations and virements. More detailed
explanations at specific project level are provided within Appendix 1. 
Department
Previously
Agreed
Changes 
2024-25
2024-25 2025-26 2026-27 Future
Years
Total
Capital
Plan
£’000 £’000 £’000 £’000 £’000 £’000
Asset
Sustainability 587 (906) 774 132 0 0
Service
Development 3,144 (60) 60 0 0 0
Strategic
Change (1,119) (7,400) 3,156 4,244 0 0
Total 2,612 (8,366) 3,990 4,376 0 0              
Service:            
ICT 0 (192) 60 132 0 0
Education 520 0 0 0 0 0
Live Argyll 0 0 0 0 0 0
Health & Social
Care Partnership (249) (363) 363 0 0 0
Shared Offices (815) (256) 256 0 0 0
Roads &
Infrastructure 3,144 (6,811) 2,567 4,244 0 0
Development &
Economic
Growth
12 0 0 0 0 0
Major Projects 0 (744) 744 0 0 0
Total 2,612 (8,366) 3,990 4,376 0 0 
The updated Capital Plan gross expenditure, incorporating these proposed changes,
is given is given within Appendix 2. 
The Capital Plan has various sources of funding, as detailed in Appendix 3.  Since
last reporting, additional funding has been recognised in respect of Crown Estates
Funding for East Clyde Street and the Harbour Investment Programme (debt financing
costs to be funded from additional revenue income, over the life of the project -
Prudential Borrowing) and allocation of Inward Investment funding to Rural Growth
Deal projects. Various funding streams have also been added to the Rothesay
Pavilion Project: Council Reserves, Heritage Lottery Fund, Historic Environment
Scotland, Highlands and Islands Enterprises and Rural Growth Deal.

Page 69

5.0 SUMMARY FINANCIAL POSITION 
Forecast Outturn 2024-25 
5.1 
5.2
Forecast net expenditure for the full financial year is £29.3334m, compared to a profiled
annual budget of £37.615m, giving rise to a forecast underspend for the year of £8.282m
(22.02%). Actual net expenditure of £23.679m has been incurred in the year to date,
representing 81% of the net expenditure forecast for the year. 
The table below provides details of the actual net expenditure incurred in the year to
date, and provides a comparison of the forecast net expenditure with the profiled budget
for the year, by project type and across services. There are a number of smaller
variances, individually less than £50k, contributing to the total variance, while material
variances are explained in Appendix 4.  
Project Type:
Profiled
Annual
Budget            
£'000
Actual
Year To
Date           
£'000
Forecast
Outturn        
£'000 
Variance         
£'000
Asset Sustainability 26,937 17,916 26,078 859
Service Development 6,613 1,430 6,590 23
Strategic Change 4,065 4,333 (3,335) 7,400
Total  37,615 23,679 29,333 8,282
Service:      
ICT 1,611 954 1,419 192
Education 8,565 5,785 8,565 0
Live Argyll 1,125 931 1,125 0
Health & Social Care
Partnership 2,086 2,216 1,723 363
Shared Offices 1,408 319 1,152 256
Roads & Infrastructure 20,168 9,795 13,441 6,727
Development & Economic
Growth 2,892 607 2,892 0
CHORD (240) 3,072 (984) 744
Total 37,615 23,679 29,333 8,282

Page 70

5.3 
5.4
Forecast Outturn – Total Capital Plan 
The forecast outturn net expenditure on the total Capital Plan is £203.116m, compared to
a budget of £202.999m, giving rise to a forecast overspend for the overall Capital Plan of
£0.117m (0.06%). 
The table below shows the forecast net expenditure and budget for the Capital Plan by
project type and service. The table below provides a comparison of the forecast net
expenditure with the total Capital Plan budget, by project type and across services. The
variance comprises a number of variances across specific projects, individually less than
£50k. 
5.5 
5.6 
Project Type:
Capital
Plan
Budget           
£'000
Forecast
Outturn       
£'000 
Variance         
£'000
Asset Sustainability 52,814 52,928 (114)
Service Development 28,816 28,793 23
Strategic Change 121,369 121,395 (26)
Total  194,140 194,257 (117)
Service:      
ICT 5,934 5,934 0
Education 44,166 44,166 0
Live Argyll 3,037 3,037 0
Health & Social Care Partnership 3,936 3,936 0
Shared Offices 18,393 18,393 0
Roads & Infrastructure 61,256 61,347 (91)
Development & Economic Growth 7,449 7,449 0
CHORD 58,828 58,828 (26)
Total 202,999 203,116 (117) 
Strategic Change Projects 
Detailed information in respect of the Strategic Change Projects within the Capital Plan is
provided within Appendix 5. For each project, this gives details of the forecast cost against
the approved budget; the start and anticipated completion date; and an assessment of
risk, using a RAG status.  Where the RAG status of a project is not Green, an explanation
is provided. 
Summary Capital Plan Monitoring – Net Expenditure 
Details of the council’s financial performance in respect the approved Capital Plan net
expenditure are outlined within Appendix 6.  This provides information for each Executive
Directorate and at a total council level.

Page 71

6.0 CAPITAL PLAN DELIVERY 
6.1 There are a total of 153 projects within the overall Capital Plan. Of this total, 139 are
Complete or On Target, 7 are Off Target and Recoverable and 7 are Off Track and
experiencing Problems. 
6.2  The table below provides a summary of the delivery status of the projects within the Capital
Plan by project type and across services. 
Project Delivery Status Summary Table 
Project Type: Complete/
On Target
Off Target/
Recoverable
Off Track/
Problem
Total
Asset Sustainability 78 6 3 87
Service Development 41 1 1 43
Strategic Change 20 0 3 23
Total 139 7 7 153
Service:    
ICT 3 0 1 4
Education 27 0 0 27
Live Argyll 16 0 0 16
Health & Social Care
Partnership
18 0 2 20
Shared Offices 19 0 1 20
Roads & Infrastructure 33 7 2 42
Development & Economic
Growth
18 0 0 18
CHORD 5 0 1 6
Total 139 7 7 153

Page 72

6.3  The above summary is also provided in graphical form, as presented below. 
Project Delivery Status Summary Graph 
0
10
20
30
40
50
60
70
80
90
100
Asset Sustainability Service Development Strategic Change
Off Target/
Problem
Off Target/
Recoverable
Complete/ On
Target

Page 73

6.4  Details of the projects currently designated as ‘Off Track’ are summarised in the table below. 
Off Track Projects Summary Table 
Project Type Project Title What is Off
Track?
Explanation
CustSupp -
Service
Development
Applications
Projects
Current Year
Expenditure
Slippage from 2024-25 into
2025-26. Budget not
required for current year
projects. Slipped and vired
to Block Allocation to
contribute towards 2025-26
Red Risks.
PropNonEdu -
Asset Sust -
HSCP
Struan Lodge Current Year
Expenditure
Slippage into 2025-26.
Project which was planned
to commence and finish in
2024-25 is now forecast to
start in March 2025.
PropNonEdu -
Asset Sust -
HSCP
Tigh An Rudha
HFE
Current Year
Expenditure
Accelerate into 2024-25
from 2025-26. Block
allocation accelerated from
2025-26.
RIS - Asset
Sustainability
Bute Sea Wall
Repairs
Current Year
Expenditure
Slippage into 2025-26.
Portion of costs falling out of
2024-25 due to works
forecast to start in Q4 of
2024-25.
RIS - Strategic
Change
Harbour
Investment
Programme
Current Year
Expenditure
Slippage from 2024-25 into
2025-26. Commencement
of Iona Breakwater
construction was delayed,
less of the forecasted costs
will fall within 2024-25 and
has slipped into 2025-26. 
Shrd-Off -
Strategic
Change
Net Zero Current Year
Expenditure
Slippage from 2024-25 into
2025-26. Projects now
identified and expenditure
will take place in 2025-26.
CHORD Kilmory Business
Park Phase 2AA
Current Year
Expenditure
Slippage from 2024-25 into
2025-26. Cost plan now
received from contractor
with agreed monthly
cashflow projection
allowing for accurate
budget forecasting which
was not possible while
awaiting this agreement.

Page 74

7.0 
7.1 
7.2 
7.3 
7.4 
7.5 
7.6 
7.7
CAPITAL PLAN RISKS 
The council’s funding bid to the Scottish Government’s Learning Estate Investment
Programme (LEIP) for a new school campus on Mull was successful. While this is good news
and will provide welcome investment in the school estate, it will not meet the full cost of the
project.  The funding gap requires to be met by the council and presents a financial pressure.
The Scottish Government will fund up to 50% of eligible costs, with the balance of circa. £20m
to be funded by the council.   
A £1m cost pressure was identified during 2021-22 in relation to repairs to the A884 Ardbeg
Sea Wall, where severe storm damage resulted in failure of the sea wall on Bute. Emergency
works were carried out and a permanent solution is currently being developed. Additional
funding of £1m was allocated for this purpose at the Council meeting on 24 February 2022,
however, there remains a risk that costs will exceed this.  A feasibility study is currently
underway to progress the permanent works and estimated costs and a further report on this
will be presented in due course. 
The impact of the pandemic, the UK exit from the European Union, the Russian invasion of
Ukraine and sanctions on Russian owned entities has seen significant price increases as well
as disruptions to the supply chain and longer lead in times. The increased rate of inflation
impacts costs such as energy prices, labour, packaging and transport. These all have an effect
on the overall contract price and make it extremely challenging to manage expenditure and
the availability of supply. 
As a result of this it should be noted that there are likely to be other significant financial impacts
which are not quantifiable at this stage, as follows: 
• Harbour Investment Programme – likely to be contractual cost increases in future years
(expected to be funded from increased fees and charges).
• In general, capital contracts across the programme are seeing significant price
increases. 
Although the direct impact of COVID on most local services has reduced, or even ceased
altogether over the last 12 months, COVID-19 in conjunction with the UK exit from the
European Union and the Russian invasion of Ukraine, continues to affect worldwide supply
chains. 
In recent years additional funding of £11.100m has been allocated to the capital programme
to deal with these cost pressures, which has mitigated the impact to date.  However, as
detailed in the table below, this has now been fully allocated or committed to projects facing
inflationary pressures.  There remains a financial risk in respect of projects, where contracts
have yet to be entered into. 
Funding for Capital Inflationary Pressures £m
COVID-19 Funding 0.257
February 2021 Budget Meeting - Capital Cost Pressures 4.646
February 2022 Budget Meeting - Capital Cost Pressures 3.900
February 2023 Budget Meeting – Capital Projects Inflation
Pressures 2.000
February 2024 Budget Meeting  - Capital Cost Project Protection 0.297
Total Additional Funding Allocated to Capital 11.100
Allocated to Projects within Capital Programme (5.779)
Committed for future years (5.202)
Balance Remaining 0.000 
The approved Capital Plan includes an assumed level of capital receipts from asset sales.  It
is currently anticipated that the target of £0.750m for the current financial year will be achieved.
However, this is subject to changing market conditions.  The level of receipts that may

Page 75

reasonably be achieved will be kept under review, to reflect changing market conditions and
due diligence undertaken on asset condition. 
8.0  IMPLICATIONS 
8.1 
8.2 
8.3 
8.4 
8.5 
8.6 
8.7 
8.8 
8.9
Policy – Monitors progress against the Capital Plan. 
Financial – Monitors financial performance on delivery of the Capital Plan. 
Legal – Highlights where available funding may not address all Statutory and Regulatory
requirements in relation to Health and Safety. 
HR – Available funding may have an impact on the sustainability of the Property Design Team
and Infrastructure Design Team. 
Fairer Scotland Duty – None. 
8.5.1     Equalities – protected characteristics – None. 
8.5.2     Socio-economic Duty – None. 
8.5.3     Islands – None. 
Climate Change – The Council is committed to addressing climate change via delivery of
projects within the Capital Plan. 
Risk – There are risks to the delivery of the Capital Plan within available resources and delivery
timescales and these continue to be monitored and reviewed, as outlined in the report. 
Customer Service – None. 
The Rights of the Child (UNCRC) - None.   
Kirsty Flanagan 
Executive Director / Section 95 Officer 
13 February 2025                                                  
Policy Lead for Finance and Commercial Services – Councillor Ross Moreland 
APPENDICES: 
Appendix 1 – Proposed Capital Plan Changes
Appendix 2 – Updated/Revised Capital Plan
Appendix 3 – Capital Funding
Appendix 4 – Forecast Outturn budget variance explanations
Appendix 5 – Strategic Change Projects 
Appendix 6 - Summary Net Expenditure Monitoring (Overall and at Executive Director level)  
For further information contact: Carolyn Earl, Acting Head of Financial Services
carolyn.earl@argyll-bute.gov.uk

Page 76

APPENDIX 1 – Changes to Capital Plan and Financial Impact
OVERALL COST CHANGES
Project 2024-25
£’000
2025-26
£’000
2026-27
£’000
Future
Years
£’000
Total
Capital
Plan £’000
Recommendation Explanation                
Total Cost Changes 0 0 0 0 0   
SLIPPAGES AND ACCELERATIONS
Project
2024-
25
£’000
2025-
26
£’000
2026-
27
£’000
Future
Years
£’000
Total Capital
Plan
£’000
Recommendation Explanation
ICT Block Allocations (132)  132   Slip budget from
2024-25 into 2026-27
Slippage into 2026-27. Correct block
allocation forecasting in line with PIP. No
changes in spending plan but correction to
capital monitoring.
Applications Projects (60) 60   0 Slip budget from
2024-25 into 2025-26
Slippage into 2025-26. Budget not required
for delivery of 2024-25 Application Projects.
Vired into ICT Block Allocation to contribute
towards identified red risks for 2025-26.
Struan Lodge (566) 566    Slip budget from
2024-25 into 2025-26
Slippage into 2025-26. Project which was
planned to commence and finish in 2024-25
is now forecast to start in March 2025.
Tigh An Rudha HFE 203 (203)    Accelerate budget
from 2025-26 into
2024-25.
Accelerate into 2024-25 from 2025-26.
Block allocation accelerated from 2025-26.
Bute Sea Wall Repairs  (359) 359   0 Slip budget from
2024-25 into 2025-26
Slippage into 2025-26. Portion of costs
falling out of 2024-25 due to works forecast
to start in Q4 of 2024-25.
Local Bridge Maintenance Fund (17) 17   0 Slip budget from
2024-25 into 2025-26
Minor slippage after reviewing monthly
profile split.
Claonaig Slip (30) 30   0 Slip budget from
2024-25 into 2025-26
Minor slippage after reviewing monthly
profile split.
Harbour Investment Programme
PB 
(6,400) 2,156 4,244  0 Slip Budget from
2024-25 into future
years.
Delays in Iona Breakwater commencing.
Marine Licence was not received in Q1/Q2
as anticipated. Marine Licence now received
though costs slipping out of 2024-25 due to
these delays.

Page 77

Net Zero (256) 256    Slip budget from
2024-25 into 2025-26
Slippage from 2024-25 into 2025-26.
Projects now identified and expenditure will
take place in 2025-26.
Kilmory Business Park Phase 2AA (744) 744    Slip budget from
2024-25 into 2025-26
Slippage from 2024-25 into 2025-26. Cost
plan now received from contractor with
agreed monthly cashflow projection allowing
for accurate budget forecasting which was
not possible while awaiting this agreement.
Total Slippages and
Accelerations (8,361) 3,985 4,376 0 0  
Net Impact of Changes (8,361) 3,985 4,376 0 0

Page 78

CAPITAL PLAN 2024-25 APPENDIX 2
Overall Summary
Service
Previous
Years
£000s
2024-25              
£000s
2025-26                
£000s
2026-27                 
£000s
2027-28                
£000s
Total
£000s
Education 38,545 8,690 2,946 1,988 0 52,169
Shared Offices 13,242 1,529 3,681 667 0 19,119
ICT 2,851 1,419 1,281 820 0 6,371
RIS 38,918 40,516 48,474 39,110 30,000 212,813
DEG 19,251 7,057 941 0 0 27,249
HSCP 1,246 3,164 2,084 0 0 6,494
Live Argyll 1,275 1,125 169 468 0 3,037
CHORD 65,713 4,324 10,857 10,000 0 90,894
Overall Total 181,041 67,824 70,433 53,053 30,000 418,146

Page 79

CAPITAL PLAN 2024-25 APPENDIX 2
Education
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26                
£000s
2026-27            
£000s
2027-28            
£000s
Total
£000s
Asset Sustainability Education Block Allocation - Education 0 278 0 1,988 0 2,266
Digital Inclusion 20-21 0 9 0 0 0 9
Free School Meals 0 0 434 0 0 434
Pre-5's/Nurseries 0 0 0 0 0 0
Preliminary RAAC Investigation 0 3,200 1,006 0 0 4,206
Primary Schools 0 3,013 1,280 0 0 4,293
Secondary Schools 0 1,086 226 0 0 1,312
Asset Sustainability Total 0 7,586 2,946 1,988 0 12,520
Service Development Education Bowmore Primary School - Gaelic Medium Grant 0 38 0 0 0 38
Bowmore Primary School - Pre Five Unit 149 0 0 0 0 149
Clyde Cottage - 600 hours provision 556 0 0 0 0 556
CO2 Monitoring - Covid Mitigation in Schools 79 113 0 0 0 192
Craignish Primary School - Pre Five Extension (600 hours funding) 400 0 0 0 0 400
Early Learning and Childcare 850 0 0 0 0 850
Early Learning and Childcare - 1140 Hours 7,774 243 0 0 0 8,017
Early Learning and Childcare - 1140 Hours - CFCR 1,379 0 0 0 0 1,379
Iona Primary School - Pre Five Unit (600 hours funding) 490 0 0 0 0 490
Islay High & Rosneath PS Pitches 719 0 0 0 0 719
Sandbank Gaelic Pre Five Unit 491 0 0 0 0 491
Service Development Total 12,887 394 0 0 0 13,281
Strategic Change Education Campbeltown Schools Redevelopment 2,092 38 0 0 0 2,130
Dunoon Primary School 10,637 232 0 0 0 10,869
Kirn Primary School 10,085 34 0 0 0 10,119
Replacement of Oban High School 2,844 406 0 0 0 3,250
Strategic Change Total 25,658 710 0 0 0 26,368
Overall Total 38,545 8,690 2,946 1,988 0 52,169

Page 80

CAPITAL PLAN 2024-25 APPENDIX 2
Shared Office
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26      
£000s
2026-27        
£000s
2027-28    
£000s
Total
£000s
Asset Sustainability Shared Offices 52 Sinclair Street Flats - CFCR 0 0 0 0 0 0
Block Allocation 0 259 427 382 0 1,068
Burnett Building 0 107 0 0 0 107
Helensburgh and Lomond Civic Centre 0 178 0 0 0 178
Kilmory Castle 0 0 1,545 0 0 1,545
Legionella Control Works 0 12 0 0 0 12
Our Modern Workspace 0 542 0 0 0 542
Asset Sustainability Total 0 1,104 2,362 382 0 3,848
Strategic Change Shared Offices Campbeltown Office Rationalisation 595 1 0 0 0 596
Clean Energy - NDEEF1 1,109 124 208 0 0 1,441
Clean Energy - NDEEF2 0 0 855 285 0 1,140
Helensburgh Office Rationalisation  (FPB,REC) 11,538 300 0 0 0 11,838
Net Zero 0 0 256 0 0 256
Strategic Change Total 13,242 425 1,319 285 0 15,271
Overall Total 13,242 1,529 3,681 667 0 19,119

Page 81

CAPITAL PLAN 2024-25 APPENDIX 2
ICT
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26      
£000s
2026-27     
£000s
2027-28       
£000s
Total
£000s
Asset Sustainability ICT Block Allocation - ICT 0 0 0 820 0 820
PC Replacement 0 561 669 0 0 1,230
Server Sustainability 0 488 400 0 0 888
Telecomms Network 0 88 152 0 0 240
Asset Sustainability Total 0 1,137 1,221 820 0 3,178
Service Development ICT Applications Projects 2,851 282 60 0 0 3,193
Service Development Total 2,851 282 60 0 0 3,193
Overall Total 2,851 1,419 1,281 820 0 6,371

Page 82

CAPITAL PLAN 2024-25 APPENDIX 2
Roads and Infrastructure Services
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26   
£000s
2026-27    
£000s
2027-28    
£000s
Total
£000s
Asset Sustainability RIS Block Allocation 0 0 -222 3,823 0 3,601
Bridge Strengthening 0 136 1,498 0 0 1,634
Bute Sea Wall Repairs 0 274 359 0 0 633
Claonaig Landslip 0 1,570 30 0 0 1,600
Coastal Change Adaptation 0 255 299 0 0 554
Coastal Protection 0 196 500 0 0 696
Environmental Projects 0 721 100 0 0 821
EV Quick Chargers 0 52 0 0 0 52
Flood Prevention 0 1,197 500 0 0 1,697
Footway Improvements 0 219 0 0 0 219
Gartbreck - Capping 0 194 0 0 0 194
Glengorm - Cell and Transfer Station (PB) 0 249 0 0 0 249
Helensburgh CHORD - Signage etc 0 10 0 0 0 10
Helensburgh Flood Mitigation 0 0 427 0 0 427
Investment in Active Travel 0 200 0 0 0 200
Lighting 0 325 369 0 0 694
Local Bridge Maintenance Fund 0 213 4,777 0 0 4,990
Play Park Renewal 0 547 391 0 0 938
POPs Waste 0 86 0 0 0 86
Public Convenience Upgrades 0 118 109 0 0 227
Roads Reconstruction 0 8,043 2,000 0 0 10,043
Roads Reconstruction - Helensburgh CHORD 0 47 0 0 0 47
Roads Reconstruction - Oban CHORD 0 3 0 0 0 3
Tobermory Car Park 0 96 0 0 0 96
Asset Sustainability Total 0 14,751 11,137 3,823 0 29,711
Service Development RIS Campbeltown Old Quay 1,381 0 0 0 0 1,381
Fleet Management 4,502 258 0 0 0 4,760
Fleet Management - Prudential Borrowing 2,674 2,152 500 0 0 5,326
Jackson's Quarry Refurbishment 285 0 0 0 0 285
Lismore Ferry Replacement 637 35 0 0 0 672
Lochgilphead Depot Rationalisation 154 115 0 0 0 269
Oban Bus Congestion - Bus Partnership Fund 50 0 0 0 0 50
Oban Depot Development 2,224 -35 0 0 0 2,189
Preliminary design for  Regional Transport projects (tif) 205 16 0 0 0 221
Public Transport Operation Vehicles 0 233 0 0 0 233
Weather Incident 326 3,208 1,100 0 0 4,634
Witchburn Road Demolition 158 0 0 0 0 158
Service Development Total 12,596 5,992 1,600 0 0 20,188
Strategic Change RIS Campbeltown Flood Scheme 13,748 1,780 10 387 0 15,925
Harbour Investment Programme Non PB 0 43 0 0 0 43

Page 83

Strategic Change RIS Harbour Investment Programme PB 9,295 17,650 35,406 34,900 30,000 143,046
Street Lighting LED Replacement 3,279 300 321 0 0 3,900
Strategic Change Total 26,322 19,773 35,737 35,287 30,000 162,914
Overall Total 38,918 40,516 48,474 39,110 30,000 212,813

Page 84

CAPITAL PLAN 2024-25 APPENDIX 2
Development and Economic Growth
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26    
£000s
2026-27     
£000s
2027-28     
£000s
Total
£000s
Service Development DEG Albert Pier Demolition - Crown Estate Funding 0 0 0 0 0 0
Ardrishaig North Active Travel 831 49 0 0 0 880
Arinagour, Coll - Site Investigation and Preliminary development Consultancy Services0 90 0 0 0 90
Cycleways - H&L (FSPT) 2,905 497 0 0 0 3,402
Dunoon Cycle Bothy 483 179 0 0 0 662
Dunoon STEM Hub 131 2,427 0 0 0 2,558
Gibraltar Street Public Realm Improvements 153 97 0 0 0 250
Glenmorag Car Park PC 0 4 0 0 0 4
Helensburgh Public Realm - Arts Strategy Fund 3 25 25 0 0 53
Hermitage Park 3,362 26 0 0 0 3,388
Nature Restoration Fund 0 835 234 0 0 1,069
Rural Growth Deal 239 1,080 0 0 0 1,319
Safe Streets, Walking and Cycling (CWSS) 3,143 619 395 0 0 4,157
SPT - bus infrastructure 1,405 25 0 0 0 1,430
Town Centre Funds 3,856 334 0 0 0 4,190
West Coast UAV Innovation Logistics and Training Hub 0 0 0 0 0 0
Service Development Total 16,511 6,287 654 0 0 23,452
Strategic Change DEG 01 TIF - Lorn/Kirk Road 2,169 1 0 0 0 2,170
09 TIF - Oban Airport Business Park 505 482 0 0 0 987
TIF - Halfway House Roundabout 66 287 287 0 0 640
Strategic Change Total 2,740 770 287 0 0 3,797
Overall Total 19,251 7,057 941 0 0 27,249

Page 85

CAPITAL PLAN 2024-25 APPENDIX 2
Health & Social Care Partnership
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26   
£000s
2026-27    
£000s
2027-28    
£000s
Total
£000s
Asset Sustainability HSCP Ardfenaig 0 15 0 0 0 15
Capital Property Works 0 203 9 0 0 212
Eadar Glinn 0 34 25 0 0 59
Glencruitten Hostel 0 301 0 0 0 301
Greenwood/Woodlands 0 16 0 0 0 16
HSCP - 102 East King Street "Jean's Bothy" - Rewire - 23-240 4 0 0 0 4
Kintyre Care Home 0 47 673 0 0 720
Lorn Resource Centre 0 33 0 0 0 33
Shellach View 0 22 0 0 0 22
Struan Lodge Boiler 0 134 566 0 0 700
Thomson Home Rothesay 0 21 776 0 0 797
Tigh An Rudha HFE 0 2,280 35 0 0 2,315
Asset Sustainability Total 0 3,110 2,084 0 0 5,194
Service Development HSCP Dunclutha Childrens Home 1,246 54 0 0 0 1,300
Service Development Total 1,246 54 0 0 0 1,300
Overall Total 1,246 3,164 2,084 0 0 6,494

Page 86

CAPITAL PLAN 2024-25 APPENDIX 2
Live Argyll
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26    
£000s
2026-27   
£000s
2027-28 
£000s
Total
£000s
Asset Sustainability Live Argyll Aqualibrium 0 63 104 0 0 167
Capital Property Works 0 12 0 382 0 394
Corran Halls Gaelic Centre 0 19 0 86 0 105
Kintyre Community Education Centre 0 7 0 0 0 7
Lochgilphead Community Ed Centre 0 411 0 0 0 411
Riverside Leisure Centre - Health Suite Upgrade 0 140 0 0 0 140
Rothesay Swimming Pool 0 24 65 0 0 89
The Moat Centre 0 393 0 0 0 393
Victoria Halls, Helensburgh 0 31 0 0 0 31
Asset Sustainability Total 0 1,104 169 468 0 1,741
Service Development Live Argyll Riverside Leisure Centre Refurbishment 1,246 0 0 0 0 1,246
Service Development Total 1,246 0 0 0 0 1,246
Strategic Change Live Argyll Carbon Management 29 21 0 0 0 50
Strategic Change Total 29 21 0 0 0 50
Overall Total 1,275 1,125 169 468 0 3,037

Page 87

CAPITAL PLAN 2024-25 APPENDIX 2
Major Projects
Category Service Project
Previous
Years
£000s
2024-25              
£000s
2025-26     
£000s
2026-27          
£000s
2027-28     
£000s
Total
£000s
Strategic Change CHORD CHORD - Dunoon 12,499 23 0 0 0 12,522
CHORD - Helensburgh -Public Realm Imprv 0 25 0 0 0 25
CHORD - Oban 7,326 500 79 0 0 7,905
CHORD - Rothesay 21,401 3,170 10,000 10,000 0 44,571
Helensburgh Waterfront Development 24,111 281 0 0 0 24,392
HWD - FFE 316 34 0 0 0 350
Kilmory Business Park Phase 2AA 60 291 778 0 0 1,129
Strategic Change Total 65,713 4,324 10,857 10,000 0 90,894
Overall Total 65,713 4,324 10,857 10,000 0 90,894

Page 88

CAPITAL PROGRAMME FUNDING Appendix 3
Estimated
Capital
Funding
Carry
Forwards
from 23-24
Slippage /
Acceleration
Additional
Funding
Updated Capital
Funding Available
Estimated
Capital Funding
Carry Forwards from 23-
24
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
Estimated
Capital
Funding
Carry
Forwards
from 23-24
Slippage /
Acceleration
Additional
Funding
Updated
Capital
Funding
Available
General Capital Grant 9,042 0 0 234 9,276 9,069 0 0 395 9,464 8,834 0 0 0 8,834
Capital Grant - Area Control Accounts 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Transfer to Revenue for Private Sector Housing Grant (PSHG) -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033 -1,033 0 0 0 -1,033
Capital Receipts 750 -138 0 0 612 750 0 0 0 750 400 0 0 0 400
Flooding Allocation 156 0 0 0 156 156 0 0 0 156 0 0 0 0 0
Ring Fenced Capital Grant 379 0 0 0 379 618 0 0 0 618 0 0 0 0 0
Restricted Funding 2,553 5,140 80 1,381 9,154 84 7,223 -80 3,389 10,616 0 0 0 0 0
Restricted Funding - Rural Growth Deal 0 0 0 0 0 0 0 0 4,000 4,000 0 0 0 5,000 5,000
Funded by Reserves 10,061 3,898 -1,598 1,956 14,317 1,412 -92 35 3,734 5,089 300 -324 132 5,000 5,108
Additional Funding from Revenue 0 0 0 4 4 0 0 0 260 260 0 0 0 0 0
Insurance 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Harbour Investment Programme 24,110 -60 -6,400 0 17,650 39,000 -5,750 2,156 0 35,406 17,585 7,112 4,244 5,959 34,900
Prudential Borrowing 17,567 -2,890 -831 3,085 16,931 166 1,600 2,007 1,334 5,107 38 -479 285 0 -156
Loans Fund Review 431 0 0 0 431 0 0 0 0 0 0 0 0 0 0
COVID Funding 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
64,016 5,950 -8,749 6,660 67,877 50,222 2,981 4,118 13,112 70,433 26,124 6,309 4,661 15,959 53,053
BREAKDOWN OF ADDITIONAL FUNDING
Additional Funding 2024-25 2025-26 2026-27 2027-28 2028-29 Reported Source
Capital Contract Increase Fund 706 28 June - 2024-25 Restricted Funds
Transport Scotland Active Travel 395 June - 2024-25 Scottish Government
Nature Restoration Fund 234 June - 2024-25 Scottish Government
Strategic Housing Fund Contribution 250 June - 2024-25 Restricted Funds
Inward Investment Fund allocation to RGD Projects 16 June - 2024-25 Restricted Funds
Revenue Contribution 4 June - 2024-25 Revenue
Weather Event - reserves funded 2,922 1,100 July - 2024-25 Earmarked Reserves
Islands Fund, PBI, Crown Estates  allocation to RGD Projects 800 July - 2024-25 Restricted Funds
RAAC Investigation 406 July - 2024-25 Earmarked Reserves
Strategic Housing Fund Contribution 74 Aug - 2024-25 Restricted Funds
Priority Investment Fund 186 Aug - 2024-25 Reserves
Reserves - Gartbreck 250 Aug - 2024-25 Reserves
Waitrose S75 funding - RGD Projects 4 Sept - 2024-25 Restricted Funds
Strategic Housing Fund Contribution 16 Sept - 2024-25 Restricted Funds
Capital Contract Increase Fund 255 Sept - 2024-25 Earmarked Reserves
TIF - Borrowing paid from NDR 397 Oct - 2024-25 TIF
CWSR - Dunoon Cycle Bothy 99 Oct - 2024-25 Restricted Funds
Islands Fund 157 Oct - 2024-25 Restricted Funds
HSCP Revenue contribution 260 Oct - 2024-25 Revenue
Coastal Change Adaptation 108 142 Nov - 2024-25 Scottish Government
5-7 East Clyde Street - Crown Estate 6 390 Nov - 2024-25 Restricted Funds
Harbour Investment Programme 5,959 30,000 15,795 Nov-2024-25 Prudential Borrowings
Rothesay Marine Gateway - Inward Investment Fund 8 Dec- 2024-25 Restricted Funds
Rothesay Pavilion 559 3,300 5,000 Dec- 2024-25 Earmarked Reserves
Rothesay Pavilion - Heritage Lottery Fund 1,200 Dec- 2024-25 Restricted Funds
Rothesay Pavilion - Historic Environment Scotland 500 Dec- 2024-25 Restricted Funds
Rothesay Pavilion - Highlands and Islands Enterprise 1,000 Dec- 2024-25 Restricted Funds
Rothesay Pavilion - Rural Growth Deal 4,000 5,000 Dec- 2024-25 Restricted Funds
6,660 13,112 15,959 30,000 15,795
2025-26 2026-272024-25

Page 89

APPENDIX 4 – Outturn Variance Explanations
Listed below are the projects where the current year variance is +/- £50k. 
Project 
Annual
Budget
£’000
Outturn
£’000
Total
(Over)/
Under
Forecast
Variance         
£’000
Explanation
Applications Projects 342 282 60
Slippage from 2024-25 into 2025-26. Budget not required for current year
projects. Slipped and vired to Block Allocation to contribute towards 2025-26
Red Risks.
Struan Lodge 700 134 566 Slippage into 2025-26. Project which was planned to commence and finish in
2024-25 is now forecast to start in March 2025.
Tigh An Rudha HFE 2280 2483 (203) Accelerate into 2024-25 from 2025-26. Block allocation accelerated from
2025-26.
Bute Sea Wall Repairs 633 274 359 Slippage into 2025-26. Portion of costs falling out of 2024-25 due to works
forecast to start in Q4 of 2024-25.
Harbour Investment
Programme
24,050 17,650 6,400 Slippage from 2024-25 into 2025-26. Commencement of Iona Breakwater
construction was delayed, less of the forecasted costs will fall within 2024-25
and has slipped into 2025-26. 
Net Zero
256 0 256 Slippage from 2024-25 into 2025-26. Projects now identified and expenditure
will take place in 2025-26.
Kilmory Business Park Phase
2AA 1035 291 744
Slippage from 2024-25 into 2025-26. Cost plan now received from contractor
with agreed monthly cashflow projection allowing for accurate budget
forecasting which was not possible while awaiting this agreement.
Other variances under £50k   (100) Total value of non-material variances less than +/-£50k.
Total  8,282

Page 90

Strategic Change Projects - Cumulative Spend, Start/Finish Dates and Project Risks APPENDIX 5
Strategic Change Projects
Prior Years
Spend
£'000
Current Year
Forecast
£'000
Total Project
Forecast
£'000
Total Project
Budget
£'000
Project Start
Date
Estimated
Completion
Date
Project
Risks
Identified Explanation
Campbeltown Flood Scheme 13,748 1,780 15,925 15,925 01/08/2016 31/03/2025 Green
CHORD Oban 7,326 500 7,905 7,905 27/10/2016 31/03/2026 Green Issues with contract close out impacting on timescales.
CHORD Rothesay 21,401 3,170 44,571 44,571 01/05/2024 31/03/2025 Green Project recommenced and awaiting Rural Growth Deal acceptance.
Harbour Investment Programme 9,295 17,693 143,089 143,089 01/04/2017 31/03/2028 Green
Dunoon Primary 10,637 232 10,869 10,869 18/12/2014 30/04/2020 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Replacement of Oban High 2,844 406 3,250 3,250 24/04/2014 31/01/2019 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Clean Energy - NDEEF1 1,109 124 1,441 1,441 01/04/2021 31/03/2025 Green
Slippage into 25-26 anticipated (and reported) with retentions likely to be payable in future financial
years.
Clean Energy - NDEEF2 0 0 1,140 1,140 01/04/2024 31/03/2027 Green
Street Lighting LED Replacement 3,279 300 3,900 3,900 01/08/2016 31/12/2025 Green Tender for final package of works still to be awarded.
Helensburgh Waterfront Development 24,111 281 24,392 24,392 01/04/2017 31/03/2025 Green Physically complete, retentions outstanding
TIF - Halfway House Roundabout 66 287 640 640 tbc tbc Green Scope of project still to be determined - budget to be reprofiled.
Kirn Primary School 10,085 34 10,119 10,119 24/04/2014 31/10/2017 Green Physically complete - negotiations with contractor delaying payment of final sums outstanding.
Helensburgh Office Rationalisation 11,538 300 11,838 11,838 25/04/2013 31/12/2022 Green Physically complete - project subject to legal dispute.
CHORD Dunoon 12,499 23 12,522 12,522 03/02/2012 09/03/2018 Green Physically complete - negotiations with contractor regarding potential construction defect.
Kilmory Business Park Phase 2AA 60 291 1,155 1,129 01/02/2022 01/09/2025 Green Development Agreement still to be concluded.
Carbon Management - Non Education 29 21 50 50 01/04/2015 31/12/2025 Green Projects being determined.
Campbeltown Office Rationalisation 595 1 596 596 01/02/2015 31/03/2019 Green Project complete in full - no further expenditure expected.
TIF - Oban Airport Business Park 505 482 987 987 22/01/2015 31/12/2025 Green
Campbeltown Schools Redevelopment 2,092 38 2,130 2,130 16/02/2012 30/11/2018 Green Physically complete - negotiations with contractor delaying payment of financial sums outstanding.
CHORD - Helensburgh - Comet Works 0 25 25 25 01/04/2023 31/03/2025 Green Art project proposed for 24-25.
TIF - Lorn/Kirk Road 2,169 1 2,170 2,170 22/01/2015 31/03/2021 Green Project complete in full - no further expenditure expected.
Net Zero 0 0 256 256 01/04/2025 31/03/2026 Green
Strategic Change Total 133,388 25,989 298,970 298,944
Project Risk Classifications:
Green - Risks can be managed and are viewed as stable or reducing.
Amber - Risks are increasing but are still manageable.
Red - Risks are increasing or have increased to such an extent they may affect delivery of the project.
Capital Expenditure Dates Risks

Page 91

ARGYLL AND BUTE COUNCIL - CAPITAL PLAN MONITORING REPORT - OVERALL COUNCIL Appendix 6
FINANCIAL SUMMARY - NET EXPENDITURE
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance Budget 2025-26
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Executive Director Douglas Hendry 9,165 9,164 1 13,290 12,927 363 23,326 23,326 0
Executive Director Kirsty Flanagan 8,876 8,918 (42) 16,431 15,935 496 32,889 33,003 (114)
Asset Sustainability Total 18,041 18,082 (41) 29,721 28,862 859 56,215 56,329 (114)
Service Development Projects
Executive Director Douglas Hendry 87 87 0 448 448 0 15,827 15,827 0
Executive Director Kirsty Flanagan 3,124 3,119 5 12,621 12,598 23 46,833 46,810 23
Service Development Total 3,211 3,206 5 13,069 13,046 23 62,660 62,637 23
Strategic Change Projects
Campbeltown Schools Redevelopment 0 0 0 38 38 0 2,130 2,130 0
Dunoon Primary 0 0 0 232 232 0 10,869 10,869 0
Replacement of Oban High 0 0 0 406 406 0 3,250 3,250 0
Kirn Primary School 0 0 0 34 34 0 10,119 10,119 0
Mull Joint Campus 0 0 0 0 0 0 0 0 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 0 0 0 300 300 0 11,838 11,838 0
Clean Energy - NDEEF1 0 0 0 124 124 0 1,441 1,441 0
Clean Energy - NDEEF2 0 0 0 0 0 0 1,140 1,140 0
Net Zero 0 0 0 256 0 256 256 256 0
Campbeltown Flood Scheme 1,217 1,217 0 1,780 1,780 0 15,925 15,925 0
Street Lighting LED Replacement 44 44 0 300 300 0 3,900 3,900 0
Harbour Investment Programme 5,669 5,669 0 24,050 17,650 6,400 143,046 143,046 0
Harbour Investment Programme Non - PB 0 0 0 43 43 0 43 43 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - Oban Airport Business Park 317 317 0 482 482 0 987 987 0
TIF - Halfway House Roundabout 0 0 0 287 287 0 640 640 0
CHORD - Helensburgh - Comet Works 0 0 0 25 25 0 25 25 0
CHORD Dunoon 0 0 0 23 23 0 12,522 12,522 0
CHORD Oban 0 0 0 500 500 0 7,905 7,905 0
CHORD Rothesay 2,749 2,749 0 3,170 3,170 0 44,571 44,571 0
Helensburgh Waterfront Development 121 127 (6) 281 281 0 24,392 24,392 0
HWD - FFE (Funded by LA) 0 0 0 34 34 0 350 350 0
Kilmory Business Park Phase 2AA 196 196 0 1,035 291 744 1,129 1,155 (26)
Strategic Change Total 10,313 10,319 (6) 33,423 26,023 7,400 299,294 299,320 (26)
Total Expenditure 31,565 31,607 (42) 76,213 67,931 8,282 418,169 418,286 (117)
INCOME
Asset Sustainability
Executive Director Douglas Hendry 0 0 0 (1,966) (1,966) 0 (3,083) (3,083) 0
Executive Director Kirsty Flanagan (166) (166) 0 (818) (818) 0 (818) (818) 0
Asset Sustainability Total (166) (166) 0 (2,784) (2,784) 0 (3,901) (3,901) 0
Service Development Projects
Executive Director Douglas Hendry 0 0 0 0 0 0 (7,741) (7,741) 0
Executive Director Kirsty Flanagan (1,776) (1,776) 0 (6,456) (6,456) 0 (25,603) (25,603) 0
Service Development Total (1,776) (1,776) 0 (6,456) (6,456) 0 (33,344) (33,344) 0
Strategic Change Projects
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary 0 0 0 0 0 0 (137) (137) 0
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (5,669) (5,669) 0 (24,050) (24,050) 0 (143,046) (143,046) 0
01 TIF - Lorn/Kirk Road (317) (317) 0 0 0 0 (2,057) (2,057) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (2,320) (2,320) 0 (7,979) (7,979) 0
HWD - FFE (Funded by LA) 0 0 0 0 0 0 (350) (350) 0
Rothesay CHORD 0 0 0 (2,009) (2,009) 0 (20,554) (20,554) 0
Kilmory Business Park Phase 2AA 0 0 0 (829) (829) 0 (829) (829) 0
Kilmory Business Park Phase 2AA - HIE 0 0 0 (150) (150) 0 (150) (150) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Strategic Change Total (5,986) (5,986) 0 (29,358) (29,358) 0 (177,925) (177,925) 0
Total Income (7,928) (7,928) 0 (38,598) (38,598) 0 (215,170) (215,170) 0
Net Total 23,637 23,679 (42) 37,615 29,333 8,282 202,999 203,116 (117)
Full Year This Financial Year Total Project Costs
31 December 2024

Page 92

MONITORING REPORT
Budget Actual Variance Budget Forecast Variance Budget Forecast Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability
Education 5,723 5,723 0 7,586 7,586 0 12,520 12,520 0
Live Argyll 931 931 0 1,104 1,104 0 1,741 1,741 0
Health and Social Care Partnership 2,192 2,191 1 3,473 3,110 363 5,194 5,194 0
Shared Offices 319 319 0 1,127 1,127 0 3,871 3,871 0
Asset Sustainability Total 9,165 9,164 1 13,290 12,927 363 23,326 23,326 0
Service Development Projects
Bowmore Primary School - Pre 5 Unit 0 0 0 0 0 0 149 149 0
Clyde Cottage - 600 hour provision 0 0 0 0 0 0 556 556 0
Craignish Primary School - Pre 5 Extension 0 0 0 0 0 0 400 400 0
Iona Primary School - Pre 5 Unit 0 0 0 0 0 0 490 490 0
Islay High and Rosneath Primary School Pitches 0 0 0 0 0 0 719 719 0
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 491 491 0
Early Learning and Childcare 0 0 0 0 0 0 850 850 0
Early Learning and Childcare - 1140 Hours 46 46 0 243 243 0 8,017 8,017 0
CO2 Monitoring - Covid Mitigation in Schools 0 0 0 113 113 0 192 192 0
Early Learning and Childcare - 1140 Hours - CFCR 0 0 0 0 0 0 1,379 1,379 0
Bowmore Primary School - Gaelic Medium Grant 16 16 0 38 38 0 38 38 0
Riverside Leisure Centre Refurbishment 0 0 0 0 0 0 1,246 1,246 0
Dunclutha Childrens Home 25 25 0 54 54 0 1,300 1,300 0
Service Development Total 87 87 0 448 448 0 15,827 15,827 0
Strategic Change Projects
Campbeltown Schools Redevelopment 0 0 0 38 38 0 2,130 2,130 0
Dunoon Primary 0 0 0 232 232 0 10,869 10,869 0
Replacement of Oban High 0 0 0 406 406 0 3,250 3,250 0
Kirn Primary School 0 0 0 34 34 0 10,119 10,119 0
Mull Joint Campus 0 0 0 0 0 0 0 0 0
Carbon Management - Non Education 0 0 0 21 21 0 50 50 0
Campbeltown Office Rationalisation 0 0 0 1 1 0 596 596 0
Helensburgh Office Rationalisation 0 0 0 300 300 0 11,838 11,838 0
Clean Energy - NDEEF1 0 0 0 124 124 0 1,441 1,441 0
Clean Energy - NDEEF2 0 0 0 0 0 0 1,140 1,140 0
Net Zero 0 0 0 256 0 256 256 256 0
CHORD Oban 0 0 0 500 500 0 7,905 7,905 0
CHORD Rothesay 2,749 2,749 0 3,170 3,170 0 44,571 44,571 0
CHORD - Helensburgh - Comet Works 0 0 0 25 25 0 25 25 0
CHORD Dunoon 0 0 0 23 23 0 12,522 12,522 0
Helensburgh Waterfront Deveopment 121 127 (6) 281 281 0 24,392 24,392 0
HWD - FFE (Funded by LA) 0 0 0 34 34 0 350 350 0
Kilmory Business Park Phase 2AA 196 196 0 1,035 291 744 1,129 1,155 (26)
Strategic Change Total 3,066 3,072 (6) 6,480 5,480 1,000 132,583 132,609 (26)
Total Expenditure 12,318 12,323 (5) 20,218 18,855 1,363 171,736 171,762 (26)
INCOME
Asset Sustainability
Education 0 0 0 (125) (125) 0 (125) (125) 0
Health and Social Care Partnership 0 0 0 (1,441) (1,441) 0 (2,558) (2,558) 0
Shared Offices 0 0 0 (400) (400) 0 (400) (400) 0
Asset Sustainability Total 0 0 0 (1,966) (1,966) 0 (3,083) (3,083) 0
Service Development Projects
Sandbank Gaelic Pre Five Unit 0 0 0 0 0 0 (485) (485) 0
Early Learning and Childcare 0 0 0 0 0 0 (918) (918) 0
Early Years 1140 Hours 0 0 0 0 0 0 (6,300) (6,300) 0
Bowmore Primary School - Gaelic Medium Grant 0 0 0 0 0 0 (38) (38) 0
Service Development Total 0 0 0 0 0 0 (7,741) (7,741) 0
Strategic Change
Helensburgh Office Rationalisation 0 0 0 0 0 0 (349) (349) 0
Dunoon Primary School 0 0 0 0 0 0 (137) (137) 0
H'burgh CHORD Public Realm Imprv 0 0 0 0 0 0 (570) (570) 0
Helensburgh Waterfront Development 0 0 0 (2,320) (2,320) 0 (7,979) (7,979) 0
HWD - FFE (Funded by LA) 0 0 0 0 0 0 (350) (350) 0
Rothesay CHORD 0 0 0 (2,009) (2,009) 0 (20,554) (20,554) 0
CHORD - Dunoon Waterfront 0 0 0 0 0 0 (10) (10) 0
CHORD - Oban 0 0 0 0 0 0 (1,624) (1,624) 0
Kilmory Business Park Phase 2AA 0 0 0 (829) (829) 0 (829) (829) 0
Kilmory Business Park Phase 2AA - HIE 0 0 0 (150) (150) 0 (150) (150) 0
Strategic Change Total 0 0 0 (5,308) (5,308) 0 (32,552) (32,552) 0
Total Income 0 0 0 (7,274) (7,274) 0 (43,376) (43,376) 0
Net Departmental Total 12,318 12,323 (5) 12,944 11,581 1,363 128,360 128,386 (26)
31 December 2024
Total Project CostsFull Year This Financial YearCurrent Financial Year To Date
Appendix 6
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR DOUGLAS HENDRY

Page 93

MONITORING REPORT
Current Financial Year To Date
Budget Actual
(Over)/Under
Variance Budget
Year End
Forecast
(Over)/Under
Variance Budget Forecast
(Over)/Under
Variance
£000s £000s £000s £000s £000s £000s £000s £000s £000s
EXPENDITURE
Asset Sustainability Projects
Roads & Infrastructure Services 8,193 8,235 (42) 15,162 14,798 364 29,711 29,765 (54)
Customer Support Services 683 683 0 1,269 1,137 132 3,178 3,238 (60)
Asset Sustainability Total 8,876 8,918 (42) 16,431 15,935 496 32,889 33,003 (114)
Service Development Projects
Preliminary design for  Regional Transport projects 0 0 0 16 16 0 221 221 0
Campbeltown Old Quay 0 0 0 0 0 0 1,381 1,381 0
Fleet Management - Prudential Borrowing 1,690 1,690 0 2,152 2,152 0 5,326 5,326 0
Fleet Management 0 0 0 258 258 0 4,760 4,760 0
Public Transport Operation Vehicles 233 233 0 233 233 0 233 233 0
Oban Bus Congestion - Bus Partnership Fund 0 0 0 0 0 0 50 50 0
Lismore Ferry 0 0 0 35 35 0 672 672 0
HITRANS Ferry Fund 0 0 0 0 0 0 0 0 0
Oban Depot Development Project 0 2 (2) (35) 2 (37) 2,189 2,226 (37)
Lochgilphead Depot Rationalisation 115 163 (48) 115 115 0 269 269 0
Jackson's Quarry Refurbishment 0 0 0 0 0 0 285 285 0
Depot Rationalisation 0 0 0 10 10 0 10 10 0
Witchburn Road Demolition 0 0 0 0 0 0 158 158 0
Weather Incident October 2023 138 138 0 3,208 3,208 0 4,634 4,634 0
Safe Streets, Walking and Cycling (CWSS) 0 0 0 619 619 0 4,157 4,157 0
SPT - bus infrastructure 0 0 0 25 25 0 1,430 1,430 0
Cycleways - H&L (FSPT) 0 0 0 497 497 0 3,402 3,402 0
Helensburgh Public Realm - Arts Strategy Fund 0 0 0 25 25 0 53 53 0
Town Centre Funds 69 69 0 334 334 0 4,190 4,190 0
Rural Growth Deal 332 332 0 1,080 1,080 0 1,319 1,319 0
Dunoon Cycle Bothy 92 48 44 179 179 0 662 662 0
Dunoon STEM Hub 19 19 0 2,427 2,427 0 2,558 2,558 0
Ardrishaig North Active Travel 3 3 0 49 49 0 880 880 0
Nature Restoration Fund 0 0 0 835 835 0 1,069 1,069 0
Gibraltar Street Public Realm Improvements 57 57 0 97 97 0 250 250 0
Hermitage Park 0 0 0 26 26 0 3,388 3,388 0
Glenmorag Car Park 4 4 0 4 4 0 4 4 0
Applications Projects 282 271 11 342 282 60 3,193 3,133 60
Arinagour, Coll - Site Investigation and Preliminary development Consultancy Services90 90 0 90 90 0 90 90 0
Service Development Total 3,124 3,119 5 12,621 12,598 23 46,833 46,810 23
Strategic Change Projects
Campbeltown Flood Scheme 1,217 1,217 0 1,780 1,780 0 15,925 15,925 0
Street Lighting LED Replacement 44 44 0 300 300 0 3,900 3,900 0
Harbour Investment Programme 5,669 5,669 0 24,050 17,650 6,400 143,046 143,046 0
Harbour Investment Programme - Non PB 0 0 0 43 43 0 43 43 0
TIF - Lorn/Kirk Road 0 0 0 1 1 0 2,170 2,170 0
TIF - Oban Airport Business Park 317 317 0 482 482 0 987 987 0
TIF - Halfway House Roundabout 0 0 0 287 287 0 640 640 0
Strategic Change Total 7,247 7,247 0 26,943 20,543 6,400 166,711 166,711 0
Total Expenditure 19,247 19,284 (37) 55,995 49,076 6,919 246,433 246,524 (91)
INCOME
Asset Sustainability
Roads & Infrastructure Services (166) (166) 0 (818) (818) 0 (818) (818) 0
Asset Sustainability Total (166) (166) 0 (818) (818) 0 (818) (818) 0
Service Development Projects
Applications Projects 0 0 0 0 0 0 (437) (437) 0
Safe Streets, Walking and Cycling 0 0 0 (376) (376) 0 (2,988) (2,988) 0
SPfT 0 0 0 (25) (25) 0 (1,268) (1,268) 0
Cycleways - H&L (FSPT) 0 0 0 (500) (500) 0 (3,502) (3,502) 0
Town Centre Funds 0 0 0 (512) (512) 0 (2,730) (2,730) 0
Rural Growth Deal (15) (15) 0 (400) (400) 0 (511) (511) 0
Dunoon STEM Hub 0 0 0 (2,050) (2,050) 0 (2,558) (2,558) 0
Ardrishaig North Active Travel 0 0 0 0 0 0 (50) (50) 0
Dunoon Cycle Bothy 0 0 0 (298) (298) 0 (563) (563) 0
Gibraltar Street Public Realm Improvements 0 0 0 0 0 0 (250) (250) 0
Hermitage Park 0 0 0 0 0 0 (3,319) (3,319) 0
Glenmorag Car Park 0 0 0 (4) (4) 0 (4) (4) 0
Fleet Management - PB (1,690) (1,690) 0 (2,152) (2,152) 0 (4,826) (4,826) 0
Fleet Management (40) (40) 0 (40) (40) 0 (89) (89) 0
Millpark Depot Demolition Insurance 0 0 0 0 0 0 (53) (53) 0
Oban Depot - Mill Park Insurance Claim 0 0 0 0 0 0 (1,681) (1,681) 0
Oban Depot - Revenue Contribution 0 0 0 (67) (67) 0 (67) (67) 0
Lismore Ferry 0 0 0 0 0 0 (500) (500) 0
Witchburn Road Demolition 0 0 0 0 0 0 (157) (157) 0
Oban Bus Congestion - Bus Partnership Fund (31) (31) 0 (32) (32) 0 (50) (50) 0
Service Development Total (1,776) (1,776) 0 (6,456) (6,456) 0 (25,603) (25,603) 0
Strategic Change Projects
Campbeltown Flood 0 0 0 0 0 0 (270) (270) 0
Harbour PB (5,669) (5,669) 0 (24,050) (24,050) 0 (143,046) (143,046) 0
01 TIF - Lorn/Kirk Road (317) (317) 0 0 0 0 (2,057) (2,057) 0
Strategic Change Total (5,986) (5,986) 0 (24,050) (24,050) 0 (145,373) (145,373) 0
Total Income (7,928) (7,928) 0 (31,324) (31,324) 0 (171,794) (171,794) 0
Net Departmental Total 11,319 11,356 (37) 24,671 17,752 6,919 74,639 74,730 (91)
31 December 2024
Full Year This Financial Year Total Project Costs
FINANCIAL SUMMARY NET EXPENDITURE - EXECUTIVE DIRECTOR KIRSTY FLANAGAN
Appendix 6

Page 94

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 20 FEBRUARY 2025
RESERVES AND BALANCES – UPDATE AS AT 31 DECEMBER 2024 
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to advise Members of the overall level of
reserves held by the council, as well as providing detail on the monitoring of the
earmarked balances held within the General Fund. 
1.2 The council had a total of £400.319m unusable reserves as at 31 March 2024 that
are not backed with resources. They are required purely for accounting purposes. 
1.3 As at 31 March 2024, the council had a total of £121.701m usable reserves,
comprising the following: 
• £2.763m Repairs and Renewals Fund;
• £3.197m Capital Funds; and
• £115.741m General Fund, with £107.443m of this balance earmarked for
specific purposes.
1.4 At the budget setting meeting on 22 February 2024, as part of the revenue budget,
Council agreed to the transfer Strathclyde Pension Fund contribution savings of
£6.875m relating to council staff and £3.053m relating to Social Work staff to
reserves.  It was also agreed that £1.875m of revenue surplus within 2024-25 be
transferred to the Capital Plan.  As the commitments for these include expenditure
within 2024-25 year, these have been immediately recognised within the
earmarked reserves balances to allow them to be spent accordingly. In addition,
Scottish Government funding in relation to the 23-24 pay award has been notified
at a value of £0.371m and this has been reinstated to the Connect for Success
earmarking as planned. Further, following a review of earmarked reserves, at its
meeting of 26 September 2024, Council approved the release of reserves totalling
£1.558m, previously earmarked for specific purposes, back to the unallocated
General Fund.  The element of the General Fund balance currently earmarked for
specific purposes now totals £118.059m. 
1.5  The current earmarked General Fund balance of £118.059m comprises the
following:  
• £58.413m invested or committed for major initiatives/capital projects; 
• £10.784m already drawn down; 
• £15.808m still to be drawn down in 2024-25; and
• £33.054m planned to be spent in future years.
1.6  The council’s General Fund contingency is set at 2% of estimated net revenue
expenditure for 2024-25, which amounts to £6.039m.  At the beginning of the

Page 95

financial year, there was an unallocated General Fund Balance of £8.298m,
representing a surplus of £2.259m over and above the general contingency.   After
taking into consideration the current forecast outturn overspend for 2024-25, this
surplus has reduced to £0.198m.

Page 96

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 20 FEBRUARY 2025
RESERVES AND BALANCES - UPDATE AS AT 31 DECEMBER 2024 
2. INTRODUCTION 
2.1 This report outlines current balances on the council’s reserves, both usable and
unusable. It also provides detail on the monitoring of the earmarked balances
within the General Fund.   
3. DETAIL 
3.1 Types of Reserves 
3.1.1 Usable Reserves - Councils have powers to establish certain resource backed
reserves which can be used to fund expenditure.  The powers of councils to
establish reserves are laid out in Schedule 3 of the Local Government
(Scotland) Act 1975.  These allow councils to establish a Renewal and Repairs
Fund, Insurance Fund and Capital Fund. Councils can also establish a Useable
Capital Receipts Reserve.  The council must also maintain a General Fund and
can earmark balances for specific purposes within the General Fund. 
3.1.2 Unusable Reserves – Councils are also required to establish certain reserves
that are not backed by resources. They are required purely for accounting
purposes and do not represent resources available for councils to utilise. The
Pensions Reserve, Revaluation Reserve, Capital Adjustment Account, Financial
Instruments Adjustment Account and Accumulated Absences Account are
examples of unusable reserves. 
3.2 Reserve Balances as at 31 March 2024 
3.2.1 The balances on each type of reserve at 31 March 2024 are set out in the two
tables below, per the Audited Annual Accounts for 2023-24. 
Unusable Reserves £000
Revaluation Reserve 180,661
Capital Adjustment Account 249,093
Financial Instruments Adjustment Account (1,585)
Pensions Reserve (19,578)
Accumulated Absences Account (8,272)
Total Unusable Reserves 400,319 
Usable Reserves £000
Repairs and Renewals Fund 2,763
Capital Fund and Usable Capital Receipts Reserve 3,197                                                                                                                
General Fund  115,741
Total Usable Reserves  121,701
Total Reserves  522,020

Page 97

3.2.2 The Revaluation Reserve represents the unrealised gains in the valuation of
fixed assets. The Capital Adjustment Account represents the difference
between depreciation based on proper accounting practice and statutory
charges for financing capital expenditure. The Financial Instruments Adjustment
Account represents the difference between gains and losses on borrowing and
statutory capital financing charges. The Pensions Reserve represents the
difference between pension costs based on proper accounting practice and
payments made for pension costs. The Accumulated Absences Account
represents the costed difference between holiday pay entitlement and actual
holidays taken at 31 March. 
3.2.3 The Repairs and Renewals Fund was established to support funding of renewal
and replacement of school equipment.  Schools can only draw on the Repairs
and Renewals Fund to the extent they have previously paid into the Fund and
contributions must be contained within schools devolved budgets. 
3.2.4 The Capital Fund was established to receive all capital receipts generated by
the council and can be used to support the capital plan or meet the principal
repayments on loan charges. The council decides as part of the budget process
each year how it wishes to draw funding from the Capital Fund. 
3.2.5 The Usable Capital Receipts Reserve relates to the accumulated unspent
capital receipts from sale of council houses prior to transfer of the housing
stock. The reserve forms part of the council’s Strategic Housing Fund and can
only be used for investment in social housing. The reserve will be used in
accordance with the approach to investing in housing, agreed by Council in
August 2012. 
3.3 General Fund 
3.3.1 The General Fund balance as at 31 March 2024 can be analysed as follows: 
Balance
31/03/24
£000
Balance on General Fund as at 31 March 2023 86,356
Increase to General Fund balance at end of 2023-24 29,385
Earmarked Balances* (107,443)
Contingency allowance at 2% of net expenditure (6,039)
Unallocated balance as at 31 March 2024 2,259 
* Note that the earmarked balance of £107.443m includes £35.658m of new
earmarked reserves relating to the Service Concessions gain as detailed at
paragraph 3.6. 
3.3.2  The General Fund includes balances that Council has agreed to earmark for
specific purposes. Some of these earmarked balances will be spent during the
current financial year and some of them will be held over and spent in later
years. The table below shows the balance at 31 March 2024, the new amounts
earmarked from the Strathclyde Pension Fund savings (see section 3.7), the

Page 98

3.3.3 
amount from the revenue budget for Capital agreed at Council in February
2024, the amount returned to earmarking from Scottish Government funding for
the 2023-24 pay award, the amounts that are currently invested or set aside for
major initiatives, the amount already spent and planned to be spent in the
current year, the amount to be spent in future years and any sums no longer
required to be earmarked. Appendix 1 provides further details on the
breakdown of unspent budget earmarkings.  Officers have reviewed and
updated the spending profiles. 
At its meeting of 26 September 2024, Council agreed to release a total of
£1.558m, previously earmarked for specific purposes, back to the unallocated
General Fund as outlined below.  It is anticipated that these resources will
contribute towards the forecast 2025-26 budget gap and, therefore, will not
contribute to the forecast surplus over and above the general contingency
balance outlined at section 3.4.

Page 99

3.3.4 
EMR
Released to
General
Fund 
£000
Expansion of Universal Free School Meals        833
Scottish Government Initiatives: Developing the Young Workforce GIRFEC
Languages 1+2          38 
(2023 Digital Projects) Cashless Catering          20 
Education Learning Estate Condition Surveys            2 
Transport for 'Smoke Free Me' Drama Production                1 
Growing our Own and Modern Apprentices          40 
Scottish Govt Islands Programme            1 
Staycation and Marketing Argyll and Bute          62 
Amenity Services introduction of management information system          28 
Bin Replacement Programme            2 
COVID Funding        418
Digital Projects: Hybrid Council meetings          31 
Debt Counselling & Welfare Rights          15
Community Resilience Fund          70 
total    1,558 
It was also agreed to make non-financial amendments, to merge specific
earmarked reserves, as outlined below.  This is the cause of the large
movement between categories in the previous reporting periods. 
Reference Description
003 Community Planning
006 Communities & Partnership Team
010 Rothesay Pavilion Charity
094 Rothesay Pavilion (Revenue)
012 Rothesay Pavilion Essential Repairs
155 Rothesay Pavilion (Service Concessions)
167 Rothesay Pavilion (Recovery & Renewal Fund)
170 Underwriting development of Rothesay
Pavilion
008 Information Management (Estates Survey
Work)
018 Site Investigation Works
042 Gaelic Specific Grant
044 Languages 1+2
074 Skills Development Scotland
085 Establishing HR Service Centre
080 Business Development Training
082 Learning and Development
086 Crown Estates (23-24)

Page 100

087 Crown Estates (22-23)
088 Crown Estates (21-22)
089 Crown Estates (20-21) 
116  EH COVID Posts
134 Waste Variation Monies
149 Waste PPP (2023 Contract Inflation
Adjustments)
030 Additional Teaching/Support in Schools/Digital
Devices/Family Home Learning Support Fund
033 School WIFI Upgrades
034 Education Transformation Fund
049 Skype for Business for Education/Digital
Projects 
3.4  Unallocated General Fund Balance 
3.4.1  The council’s General Fund contingency is set at 2% of estimated net revenue
expenditure for 2024-25, which amounts to £6.039m.   At the beginning of the
financial year, there was an unallocated General Fund Balance of £8.298m,
representing a surplus of £2.259m over and above the general contingency.  
After taking into consideration the current forecast outturn overspend for 2024-
25, this surplus has reduced to £0.198m. 
3.4.2 The revenue budget monitoring position as at 31 December 2024 is a forecast
overspend of £4.215m, of which £2.179m relates to Social Work.  The Chief
Financial Officer of the IJB has now written to the Council to request access to
the Strathclyde Pension Fund Gain that is held in reserves for the HSCP and,
therefore, it is expected that Social Work will outturn within budget, after
applying these reserves.  
3.4.3 In relation to the adverse weather event of October 2023, it was agreed at the
Policy and Resources meeting on 15 August 2024 to continue the roads
reconstruction schemes and the overspend be funded as follows: 
£000
Utilise some of the unallocated capital funding for street
lighting and cable and column replacements
100
Use Priorities Investment Fund 944
Use Crown Estate Funding 780
Borrowing for additional expenditure and use £50k in the
loans fund for street lighting improvements toward the
cost of borrowing
2,029
Total 3,853 
3.4.4 A contribution of £25k to LiveArgyll, to be funded from the unallocated General
Fund balance, was approved by Council on 23 November.  This award will meet
staff costs associated with the use of the Corran Halls for the duration of the
Royal National MOD.

Page 101

3.4.5 The following table summarises the position of the unallocated General Fund
balance, taking into consideration the points noted above. 
Heading Detail £000
Unallocated General Fund
as at 31 March 2024
This is the balance that is
unallocated over and above the 2%
contingency, which amounts to
£6.039m
2,259
Current Forecast Outturn
for 2024-25 as at 31
December 2024
Per Revenue Budget Monitoring
report
(4,215)
Social Work Forecast
Outturn adjustment
Per paragraph 3.4.2 -  Social Work
variance expected to be managed
from within IJB reserves 
2,179
LiveArgyll Funding Award Per paragraph 3.4.4 – Contribution
in respect of RNM event, to be met
from unallocated GF balance
(25)
Forecast Unallocated General Fund as at 31 March 2025 198 
3.5 Loans Fund Review 
3.5.1 At the Council meeting of 27 February 2020, it was agreed that the one-off re-
profiling gain of £20.561m generated by the loans fund review should be used
partly to create a provision for the increasing principal repayments over the next
10 years (£7.649m) with the remainder of the gain (£12.912m) used to fund
known liabilities/cost pressures. The £12.912m has now been transferred to
Earmarked Reserves in full. 
3.6 Service Concessions 
3.6.1 
3.6.2
At the Council meeting of 23 February 2023, it was agreed that the council
adopt the financial flexibility introduced by the Scottish Government relating to
Service Concession contracts. This resulted in a one-off retrospective gain of
£36.038m.  The commitments associated with this were further refined at the
Council meeting of 22 February 2024 and it was agreed that £0.380m be
transferred into the General Fund balance, leaving a one-off gain of £35.658m
which is now being held in earmarked reserves.  Further, existing earmarkings
totalling £2.666m in respect of Rothesay Pavilion have been consolidated with
the Service Concessions earmarked resources, for monitoring purposes. 
Appendix 2 provides information on these commitments, totalling £38.324m. 
At the budget meeting on 23 February 2023, the Council established a £7m
Priorities Investment Fund from the Service Concession gain; to lever in, secure
and support key strategic investments in this year and future years.  By the
budget meeting on 22 February 2024, £0.850m has been committed towards
the Housing Emergency, Area Plans and Strategic Development Frameworks,
leaving £6.150m.  A further £1.028m was then committed towards the capital
plan and £0.380m to supplement the Unallocated General Fund Balance, as
outlined at paragraph 3.6.1, with a remaining balance of £4.742m.
Commitments made during 2024-25 were £0.050m for the Clipper Race and

Page 102

£0.944m towards the weather incident costs, leaving a balance of £3.748m
remaining in the Fund. 
3.7 Strathclyde Pension Fund Reserves 
3.7.1 The Strathclyde Pension Fund reported an exceptionally strong set of results
with a surplus of almost £9bn which has allowed a reduction in the employer
contribution rate.  Argyll and Bute Council is seeing a reduction in employer
contributions from 19.3% to 6.5% over 2024-25 and 2025-26, before reverting
to a sustainable long-term rate in the third year of 17.5%.  For the council, the
one-off saving in the first two years associated with a reduction to 6.5% is
£6.875m per year.  On 22 February 2024, Council agreed to allocate the
cumulative gain in the first two years of £13.750m as follows: 
Description 2024-25
£000
2025-26
£000
Total
£000
Realised saving 6,875 6,875 13,750
£2m in 24-25 to balance revenue budget (2,000)  (2,000)
£3.750m allocation to capital plan (3,750)  (3,750)
£2m to be directed towards
Transformation/ Spend to save projects (1,125) (875) (2,000)
£2m in 25-26 to balance revenue budget  (2,000) (2,000)
£2m in 26-27 to balance revenue budget  (2,000) (2,000)
£2m allocation to capital plan  (2,000) (2,000) 
0 0 0 
3.7.2  The £6.875m from the 2024-25 revenue budget saving has been logged within
the earmarkings with the commitments noted above to allow expenditure to be
made against them. 
3.7.3 For Social Work, the SPF saving is £3.053m per annum and is being ring
fenced within the Council reserves for utilisation by the HSCP in the future. 
This amount is also being logged with the earmarkings in 2024-25 to allow
expenditure to be made, if required.   
3.7.4 As at 31 December 2024, the commitments against the Strathclyde Pension
Fund gain for Transformation/Spend to Save projects are as follows: 
Description Commitment
£000
Data Platform Build Consultancy – to build a data platform
which will provide a new approach to how ABC organised and
accesses its data to support strategic decision making. 44
RIS Service Review – a report was presented to EDI on 20
June 2024 regarding the need for external support to assist in
delivering recommendations from Stage 1 of the RIS Review. 150
Conversational AI – towards an investment in a one-year proof
of concept contract to implement Conversational AI across the
web, voice and social media channels for the council. 31
Total Committed 225

Page 103

Kirsty Flanagan
Executive Director/Section 95 Officer 
17 January 2024 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
APPENDICES
Appendix 1 – Earmarked Reserves breakdown of unspent budget
Appendix 2 – Earmarked Reserves breakdown of Service Concessions earmarkings 
For further information contact Carolyn Earl, covering Head of Financial Services
Carolyn.Earl@argyll-bute.gov.uk    
4. CONCLUSION 
4.1 The report outlines the overall reserves and balances for the council covering
the purpose and level of each reserve.  It also provides detail as to expenditure
against earmarked balances held within the General Fund.   
4.2 After taking account of the current forecast outturn for 2024-25, the council’s
unallocated General Fund balance, over and above the general contingency, is
forecast to be £0.198m as at 31 March 2025. 
5.  IMPLICATIONS 
5.1 Policy - Earmarked funds and funds set aside for delivery of
Single Outcome Agreement are available to support
council policy.
5.2 Financial -  Outlines the balances held within the council’s usable
and unusable reserves.     
5.3 Legal -  None.
5.4 HR -  None.
5.5 Fairer Scotland Duty- None.
5.5.1 Equalities – protected
characteristics - 
None.
5.5.2 Socio-economic Duty -  None.
5.5.3 Islands -  None.
5.6 Climate Change - None.
5.7 Risk -  A contingency of £6.039m (equivalent to 2% of net
expenditure) has been set aside as part of the
General Fund.  This has been subject to a risk
assessment. 
5.8 Customer Service -  None. 
5.9 The Rights of the Child
(UNCRC) - 
None.

Page 104

No embedded text on this page.

Page 105

APPENDIX 1
Earmarked Reserves - Unspent Budget
As at 31 December 2024
Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
001 Chief Executive's Unit Community
Planning
Service Concessions - Priorities Investment
Fund (Area Plans)
200,000 86,838 113,162 13,162 100,000 As agreed by Policy and Resources Committee on 23 October 23 - drawdown of
£200,000 from the Priorities Investment Fund to fund two temporary posts and
associated costs to produce meaningful area plans
100,000 100,000 0
006 Chief Executive's Unit Community
Planning
Communities and Partnership Team 8,855 0 0 0 0 The funds have originated from externally sourced income due to an employee being
seconded to the Scottish Community Development Centre (SCDC).  The funds will be
used to support the team in relation to meeting its priorities of Building Back Better
(Communities), Climate Change and the review of the Argyll and Bute Outcome
Improvement Plan.  This earmarking merged September 24 (per Council Decision)
with 003 Community Planning - temp post to support communities.
0 0 0
008 Executive Director (Douglas
Hendry)
Across Services /
Commercial
Services
Information Management (Estates Survey
Work)
12,697 0 0 0 0 To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of
change as outlined in the BV Review.  The planned initiatives include: Estates Survey
work £122k, Digitalisation of Title Deeds £92k, document management and workflow
system for Planning, Building Standards and Environmental Health £77k and a
balance of funding to explore information management solutions in a strategic and
coherent way £209k. This balance relates to Estates Survey Work. Having a procured
supplier to provide floor plans at short notice is required to be able to react quickly
to requests. If this isn't available Estates would need to go through the procurement
process again which would delay any projects by several months. There isn’t a
detailed plan to use this resource it is more about being able to react quickly and not
delay projects. 
Council agreed September 24 to merge this with 018 Site Investigation works.
0 0 0
009 Executive Director (Douglas
Hendry)
Across Services /
Education
Digital Projects (Supply Staff Booking
System)
15,200 9,900 5,300 0 5,300 To deliver a number of Digital Service Transformation Projects with a commitment of
£0.035m towards a Supply Staff Booking system.  Phase 1 of the project is nearing
completion.
9,900 5,300 0
010 Executive Director (Douglas
Hendry)
Commercial
Services
Rothesay Pavilion Charity 750,000 0 1,159,204 0 1,159,204 Agreed at Council meeting February 2020,Unspent Budget Earmarking 010 of £750k
additional revenue support subject to conditions which seek to minimise the risk to
the Council as far as is reasonably practicable including requirement for adequate
business and financial management and regular reporting by RPC.  This funding is to
support Rothesay Pavilion Charity in the first 2 years of the building being
operational.  Merged September 24 per Council decision with CHORD earmarking 094
£409k which was about building up a provision towards future Council commitment
to provide up to £150,000 per annum running costs for Rothesay Pavilion.
0 1,038,608 120,596
012 Executive Director (Douglas
Hendry)
Commercial
Services
Rothesay Pavilion Essential repairs 306,400 0 0 0 0 Essential repairs to deal with potential health and safety risks and to avoid further
deterioration.  Budget provision was approved by the Policy and Resources
Committee on 21 August 2014.   At Council Meeting September 24, it was agreed to
merge the 4 capital earmarkings for Rothesay Pavilion into one line with the
narrative indicating the sources.  Earmarkings 012, 155, 167 and 170 combined under
reference 155.
0 0 0
014 Executive Director (Douglas
Hendry)
Commercial
Services
Commercial Investment Manager post and
specialist consultant technical resource
(previously Asset Management Fund)
104,000 24,758 79,242 79,242 0 The Asset Management Fund has been redirected to Capital going forward but the
interest for 2023-24 is to be used towards a Commercial Investment Manager Post. 
This is because funding of £200k from the Asset Management Fund was agreed at ELT
in June 22 for the post, along with specialist consultancy and technical resources  that
will be required to support early projects.  Note, the  £104k represents the balance of
the £200k commitment.
104,000 0 0

Page 106

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
015 Executive Director (Douglas
Hendry)
Commercial
Services
Estates - NDR Revaluation Appeals 59,938 0 59,938 29,969 29,969 The Council agreed to make provision to meet the cost of appealing Non Domestic
Rates (NDR) revaluations which were imposed from April 2017. The remaining funds
were carried forward to the 2023/24 revaluation cycle however a recent change in
position by the Scottish Government may restrict the appeals which can be made.
This is still under discussion and Gerald Eve Surveyors have been appointed as
specialist advisers on this matter, who are progressing 2023-26 appeals. In the event
that appeals are limited there may be an opportunity to utilise Gerald Eve for more
general valuation advice subject to Procurement approval.
29,969 29,969 0
016 Executive Director (Douglas
Hendry)
Commercial
Services
Mid Argyll Community Pool 30,000 30,000 0 0 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.030m to Mid Argyll Community Pool in response to an external
funding request.
30,000 0 0
017 Executive Director (Douglas
Hendry)
Commercial
Services
MacTaggart Leisure Islay 30,000 30,000 0 0 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.030m to MacTaggart Leisure, Islay in response to an external
funding request.
30,000 0 0
018 Executive Director (Douglas
Hendry)
Commercial
Services
Site Investigation Works 21,013 0 33,710 33,710 0 ER018 24-25  £21k - For Site Investigation works in relation to Tweeddale Street Car
Park and Oban Airport Business Park, exploring commercial opportunities to develop
the sites and raise revenue income for Argyll and Bute Council. HUB North were
instructed to procure contractors to undertake the site investigations these are now
complete. The remainder of the budget is intended to be utilised for other site
investigation and pre-development works to further develop commercial
opportunities across the council area.
Agreed by Council September 24 to combine 24-25 ER008 Information Management
(Estates Survey Work) - Having a procured supplier to provide floor plans at short
notice is required to be able to react quickly to requests. If this isn't available Estates
would need to go through the procurement process again which would delay any
projects by several months. There isn’t a detailed plan to use this resource it is more
about being able to react quickly and not delay projects.
33,710 0 0
021 Executive Director (Douglas
Hendry)
Education ASN Review 1,255,000 0 1,255,000 565,000 690,000 To fund capital costs of ASN adaptations as part of ASN Review to increase equity of
provision across Argyll and Bute.  This will be subject to a business case as part of the
wider ASN review. Update: Business case now approved and working group set up
with quotes for works being carried out.
565,000 690,000 0
024 Executive Director (Douglas
Hendry)
Education Reduced Teacher Staffing Costs - Strike
Action
800,000 800,000 0 0 0 To fund one off savings in 2024-25 from the underspend in staffing from strike action. 800,000 0 0
033 Executive Director (Douglas
Hendry)
Education (2023 Digital Projects) School WiFi
Upgrades
166,924 0 0 0 0 To extend WiFi coverage within school settings through the purchase of additional
hardware such as access points, switches and other networking hardware. This will
result in more flexible learning spaces and support the growing number of devices
within schools. Project now underway and if budget not fully utilised it is hoped that
the balance could be diverted to assist with Capital costs of Education Network
Paper.
0 0 0
034 Executive Director (Douglas
Hendry)
Education Education Transformation Fund 144,637 0 0 0 0 At the Council meeting on 27 February 2020, it was agreed to input £400k into
Education Digital Learning.  The additional funds have been spent in 20/21, 21/22 and
22/23 as part of the ongoing transformation work in the Education service, focussing
on digital and virtual learning technology and the development of learning clusters. 
0 0 0
036 Executive Director (Douglas
Hendry)
Education MCR Pathways Pilot 80,000 0 80,000 80,000 0 Funding to support implementation of MCR Pathways mentoring programme within
three secondary schools for 2023-24 academic year. Funding will allow the
employment of a dedicated Co-ordinator within each setting to develop and
implement the programme which is designed to benefit care experienced and other
disadvantaged pupils through targeted mentoring support.
80,000 0 0
042 Executive Director (Douglas
Hendry)
Education Gaelic Specific Grant 30,000 0 30,000 0 30,000 Gaellic Specific Grant £30k - This earmarking refers to the Council contribution
towards the Gaelic grant for 22-23 and will fund the costs of Gaelic Language
Principal Teacher in 24-25 academic year.
0 30,000 0
043 Executive Director (Douglas
Hendry)
Education (2023 Digital Projects) Cashless Catering 30,000 4,996 5,004 5,004 0 To support the ongoing implementation of the new cashless catering system during
the testing and roll out phase.
£20k released back to General Fund Septmber 24 per Council decision as no longer
required.
10,000 0 0

Page 107

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
049 Executive Director (Douglas
Hendry)
Education Skype for Business for Education / Digital
Projects (Skype for Business)
10,000 0 0 0 0 To fund the initial capital costs for the implementation of Skype for Business for
Education.  This will bring the Education service in line with other council
departments and will improve staff collaboration and modernise school telephony to
deliver the  service more efficiently and cost effectively.
0 0 0
052 Executive Director (Douglas
Hendry)
Education Education Learning Estate Condition
Surveys
1,815 0 0 0 0 To fund the delivery of School Core Facts (SCF) compliant Condition Surveys for
prioritised School Buildings.
Balance of £2k released back to General Fund per Council decision September 24 
due to the small amount remaining which can be covered by the service.
0 0 0
059 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Education Purchasing Officers 210,000 0 210,000 0 210,000 The earmarked funds will be used to fund an education purchasing team within the
Procurement Service for two years.  The team will embed good procurement
practice, train headteachers on current procurement process requirements, develop
spend plans that evidence best value.
0 210,000 0
061 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Information Management (Digitalisation of
Title Deeds)
92,000 0 92,000 20,500 71,500 To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of
change as outlined in the BV Review.  The planned initiatives include: Estates Survey
work £122k, Digitalisation of Title Deeds £92k (delay on spending due to COVID-19),
document management and workflow system for Planning, Building Standards and
Environmental Health £77k and a balance of funding to explore information
management solutions in a strategic and coherent way £209k
20,500 51,000 20,500
063 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
(2023 Digital Projects) Replacement of
Council Chambers Online Meeting
Equipment
50,071 5,353 44,718 0 44,718 Current online meeting system  is less than resilient and has failed on a number of
occasions, leading to issues at strategic committees. A condition assessment by the
incumbent maintenance contractor has highlighted that the current equipment is
now at end of life and unsupportable due to the  obsolescence of the system.
Discussions with ICT have taken place to identify a simpler more robust solution to be
procured.
NUWAY system and maintenance, system installed, ongoing maintenance contract to
2030
5,353 44,718 0
064 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Councillor IT Equipment 44,557 0 44,557 22,000 22,557 There is currently no budget for the provision and renewal of IT equipment for
members. The earmarking identifies a resource to utilise spend for that purpose to
ensure that members have continued support in maintaining and replacing vital IT
equipment.
22,000 22,557 0
065 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Digital Projects: Hybrid Council meetings 43,302 12,000 0 0 0 The funding will be used to maintain the ICT equipment used to support the provision
of on-line and hybrid Council meetings.  Will be used to fund Public-I licence over 3
years - for livestreaming Council meetings.
Balance of £31k released back to General Fund per Council decision September 24
and an associated cost pressure built in to 2025-26 budget cover the routine annual
costs.
12,000 0 0
066 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Debt Counselling & Welfare Rights 21,452 5,265 735 735 0 To meet the cost of a Debt Counselling and Welfare Rights Management System.
Balance of £15k released back to General Fund per Council decision September 24
and an associated cost pressure built in to 2025-26 budget cover the routine annual
costs.
6,000 0 0
067 Executive Director (Douglas
Hendry)
Non Departmental
/ Legal and
Regulatory
Services
Community Resilience Fund 71,999 0 5,000 5,000 0 Fund established in 2012/13 to be spent over more than one year. Fund reduced at
the Council meeting on 11 February 2016.  Used to cover the costs of emergency
phone lines and a contract with Aggreko for generators if required in an Emergency
Planning/Civil contingencies incident.  These costs amount to approximately £5k per
year.
Balance of £67k released back to General Fund per Council decision September 24
and an associated cost pressure built in to 2025-26 budget cover the routine annual
costs.
5,000 0 0

Page 108

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
068 Executive Director (Kirsty Flanagan) Across Services /
Customer Support
Services
Digital Projects (Increase in Schools
Bandwidth)
63,455 0 63,455 0 63,455 To complete one of a number of Digital Service Transformation projects with a
commitment of £0.064m to increase Schools Bandwidth.  Committed for MS 365
project - D Logan/I Jackson. Paper went to ELT in Dec 24.
0 0 63,455
069 Executive Director (Kirsty Flanagan) Across Services /
Customer Support
Services
Digital Projects (Replacement Learning
Management System)
11,470 0 11,470 11,470 0 To deliver a number of Digital Service Transformation Projects with an original
commitment of £0.030m towards a replacement Learning Management System
£0.030m.  This money will be used to pay for consultancy for an interface between
itrent and totara. Profiled for 24/25 based on decision to do a phased
implementation of itrent.
11,470 0 0
070 Executive Director (Kirsty Flanagan) Across Services /
Development and
Economic Growth
Information Management (Document
Management and Workflow for Planning,
Building Standards and Environmental
Health)
21,177 0 21,177 21,177 0 Hoping to implement the replacement for IDOX in March 2024 but there have been
severe issues/delays with the new programme . 
Dec 24 Project has been scrapped as it was not working. Awaiting procurement to
write termination of contract legal documents, until this is completed we will not
know if any further cost are due.
21,177 0 0
073 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) iTrent Project 320,555 0 320,555 320,555 0 Combination of parallel running of the new iTrent system alongside the legacy
systems for up to 18 months whilst iTrent is implemented and additional staffing
resource to implement iTrent in late June 2024 and support staff for the first 3
months of operation through summer 2024. Total includes £73k from Financial
services for funding additional staffing resource to implement the payroll
components of the iTrent HR and Payroll System by the end of June 2024 and support
staff for the first 3 months of operation during summer 2024.
320,555 0 0
075 Executive Director (Kirsty Flanagan) Customer Support
Services
Growing our Own and Modern Apprentices 109,150 0 69,150 44,000 25,150 Funding earmarked to support trainee development and modern apprenticeship
opportunities based on priority workforce risk areas.  A Trainee Regulatory Services
post has been proposed by the manager who was unable to secure a suitable
candidate for the original advert. The spend would be spread over 24/25 and 25/26
once a suitable candidate is in post.
Balance of £40k released back to General Fund per Council decision September 24 as
only £69k is still required for the intended purpose.
44,000 25,150 0
076 Executive Director (Kirsty Flanagan) Customer Support
Services
Security Operations Centre Subscription 71,188 0 71,188 0 71,188 There is a requirement to pay for a 3-year subscription at £60,000 per annum with a
cost pressure being added to the ICT revenue budget to cover the costs from 2026-27
onwards. 
0 71,188 0
077 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Resilient Website
Project
60,000 14,000 46,000 0 46,000 Cybersecurity action to move to a cloud based website platform that would improve
resilience and enable service continuity in the event of a cyber attack.  Procurement
in progress for resilient website solution and Scotgov Cloud Services Project providing
input. Contract Award expected by end 2023. Procurement in progress for resilient
website solution.   Contract Award expected FQ1 2024-5.  3 year contract has been
awarded to BigBlueDoor.  14k spend 24/25, 23k in 25/26 and 23k in 26/27.
14,000 23,000 23,000
078 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Digital Project
Officer
34,121 0 34,121 34,121 0 Employ a temporary Digital Project Officer as part of OD changes - additional
member of staff required to action changes, unable to recruit so existing staff
increasing hours.
34,121 0 0
079 Executive Director (Kirsty Flanagan) Customer Support
Services
Implementation of Gaelic Language Plan 30,000 0 30,000 2,000 28,000 Agreed at Council Meeting February 2021.  Provision of funding for delivery and
implementation of the council’s Gaelic Language Plan in recognition of the
contribution that Gaelic makes to economic growth and to the tourism sector, and to
enable delivery of key activities within the plan which currently receive no revenue
funding.  In discussion with Bord na Gaidhlig about a 3-year Gaelic Plan funding
programme as opposed to individual grant applications for specific projects. This
earmarking would be used to provide match funding for that 3 year programme of
projects.  3 year match funding approved December 2024.
2,000 28,000 0

Page 109

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
080 Executive Director (Kirsty Flanagan) Customer Support
Services
Business Development Training 27,025 20,397 26,064 -397 26,461 £27k budget from original Business Development Training earmarking 080 remaining
at 31/03/24.  This budget is funding ongoing leadership development, coaching,
action learning sets and commissioned training including Priority Management.
Agreed by Council September 24 to merge with 24-25 EMR 082 - In order to
maximise the opportunities and efficiencies of digital learning, this funding will be
used to support the extension of digital learning in order to deliver the Digital
Learning Strategy, which was approved in FQ4 20/21. This money is to support the
additional digital learning capacity required to build online elements of AB365 and
other key digital learning as we increase our digital learning offering linked to the
digital skills survey and review of corporate training. Delays in recruitment meant this
has been reprofiled for spend in 24/25.
20,000 26,461 0
082 Executive Director (Kirsty Flanagan) Customer Support
Services
Learning and Development 19,436 0 0 0 0 In order to maximise the opportunities and efficiencies of digital learning, this
funding will be used to support the extension of digital learning in order to deliver
the Digital Learning Strategy, which was approved in FQ4 20/21. This money is to
support the additional digital learning capacity required to build online elements of
AB365 and other key digital learning as we increase our digital learning offering
linked to the digital skills survey and review of corporate training. Delays in
recruitment meant this has been reprofiled for spend in 24/25.  Agreed by Council
September 24 to merge with 24-25 080 Business Development Training.
0 0 0
083 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Digital Engagement
Services Developer
15,677 13,504 2,173 2,173 0 To fund 50% of a new temporary LGE10 post.  The post is a Digital Engagement
Services Developer that will be provide capacity to deliver service efficiencies
through the use of the  new CREATE/RPA software.  The other 50% of the post can be
funded from a current vacancy. 
15,677 0 0
085 Executive Director (Kirsty Flanagan) Customer Support
Services
Establishing HR Service Centre 13,824 0 0 0 0 To facilitate the implementation of technical efficiency improvements and new
processes.  This money will be used to support phase two of the itrent project.  Spend
reprofiled for 2024/25 following delays in itrent project.  Agreed by Council
September 24 to merge this with earmarking 074 Skills Development Scotland.
0 0 0
096 Executive Director (Kirsty Flanagan) Development &
Economic Growth
Planning Income 60,000 0 60,000 60,000 0 To fund additional resources to support and develop the Council's planning service. 
Whilst recruitment issues within Argyll and Bute were largely been resolved during
2022/23, the requirement for the operation of the DM Service with reduced staffing
levels over an extended period of time, coupled with the increasing demand for
development post-Covid, and uncertainty caused by the introduction of National
Planning Framework 4 has given rise to a substantial backlog of case work and has
had a significant adverse impact on processing times for planning applications. Plans
to utilise this on additional staff costs in 24-25 in order to reduce the backlog.
Dec 24  draw down likely March 25
60,000 0 0
103 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Oban TIF (Tax Incremental Financing) 214,158 0 214,158 214,158 0 Will be used to fund the TIF Programme office for a further 3 years as well as the
programme office for Rural Growth Deal beyond the funding that was agreed at
Council for this in February 2021.
214,158 0 0
105 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Service Concessions - Priorities Investment
Fund (Project Officer for Housing
Emergency)
200,000 0 200,000 70,000 130,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£200,000 from the Priorities Investment Fund to fund a Project Officer to assist in
accelerating the work of the Housing Emergency.
Dec 24 post holder now in place awaiting further instruction from Budget holder
70,000 130,000 0
107 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Strategic Events & Festivals 41,260 15,100 26,160 26,160 0 At the Council meeting on 25 February 21, a decision was taken to agree £90k
funding for Events and Festivals for 22/23, in order that the application process can
commence during 21/22 and that this agreed figure be augmented by any
underspend remaining from the 20/21 financial year.  At 24 February 22, decision
made to agree £90k for 23/24, in order that the application process can commence
during 22/23 and that this agreed figure be augmented by any underspend remaining
from the 21/22 financial year.  Applications have been received and payments will be
made in 23-24. Final balance (£41,260) to be spent in 24/25
Dec 24 cost to date drwn down
41,260 0 0
112 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Screen Machine 28,000 0 28,000 28,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.028m to Screen Machine in response to an external funding
request.
Dec 24  Grant offer has now been sent out but payment now not due until Q1 25/26
28,000 0 0

Page 110

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
120 Executive Director (Kirsty Flanagan) Development and
Economic Growth
International Eight Metre Association
World Cup
10,000 10,000 0 0 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.010m to the International Eight Metre World Cup in response to
an external funding request.
10,000 0 0
124 Executive Director (Kirsty Flanagan) Financial Services Revenue and Benefits BPR  - extra staff to
implement savings targets
86,955 0 86,955 0 86,955 On 23 February 2023, the Council agreed to the implementation of savings option
FIS2324-002 in relation to the Revenue and Benefits - Income Generation and
Business Process Review.   This included an extra 4 FTE of staff.  Delays in recruitment
have caused slippage in the allocated budget for these posts. 
0 86,955 0
127 Executive Director (Kirsty Flanagan) Financial Services Scotland Loves Local 57,453 57,453 0 0 0 As agreed by Council 22 February 24, a £57,453 underspend from the Scotland Loves
Local scheme to be allocated to support measures to help with the costs of living by
funding member organisations of the Community Food Forum, ALI Energy, Argyll and
Bute Citizens Advice Bureau and Bute Advice Centre, with detailed proposals to be
agreed by the Executive Director with responsibility for Finance, in consultation with
the Leader, Depute Leader and Leader of the Largest Opposition Group. Details of the
agreed spend are to be reported to elected members.
57,453 0 0
129 Executive Director (Kirsty Flanagan) Financial Services Financial Systems 33,748 0 33,748 33,748 0 The council is required to implement the IFRS16 Leases accounting standard  from
the 1st April 2024.
33,748 0 0
130 Executive Director (Kirsty Flanagan) Financial Services Accounting and Budgeting Team Resilience 47,883 7,066 40,817 934 39,883 Training and examination fees for 6 staff who are currently undertaking their
professional CIPFA/ACCA training.  In addition funding the further training of 1 of our
auditors and providing finance business partner training to a group of our existing
professional staff.
8,000 8,000 31,883
134 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Waste Variation Monies 1,241,752 108,524 1,356,489 353,855 1,002,634 Waste Variation Monies - £1.242m balance at 31/03/24 (Original EMR134): This will
be used to fund/part-fund various waste infrastructure projects that will support the
council’s compliance with the 2026 ban on the Landfill of Biodegradable Municipal
Waste.
£462K in 2024-25 consisting of :- Island restoration/capping (£250K Gartbreck
completed will be tsf to capital), Helensburgh transfer station, recycling improve.
fund (island sites) design costs, recycling campaign publicity, technology trial on blue
bin recycling participation, consultancy costs relating to additional monitoring data
for SEPA and Consultancy follow on waste options appraisal and recycling campaign
material.
£993K in 2025-26  consisting of:- Island restoration/capping, Helensburgh transfer
station design costs pending outcome of business case, consultancy costs relating to
additional monitoring data for SEPA, recycling improve. fund (island sites) design
costs and waste PPP site conversion.
£10K in 2026-27 consisting of:-  consultancy costs relating to additional monitoring
data for SEPA.
Council agreed to merge with EMR149 September 24 - to be used to assist with the
Council's compliance with the 2026 ban on the Landfill of Biodegradable Municipal
Waste and supporting the overall Waste Strategy.
462,379 992,634 10,000
138 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Service Concessions - Priorities Investment
Fund (Strategic Development Framework)
450,000 0 450,000 225,000 225,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£450,000 to procure consultancy support to assist in driving forward the Strategic
Development Frameworks.
225,000 225,000 0
141 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
3G pitches / Tarbert Sports Pitches 287,835 81,158 206,677 7,149 199,528 In November 2018, the Council agreed to a maintenance funding package to be
progressed for a number of 3G pitches including Tarbert. This funding will provide an
estimated 6.5 years’ worth of ongoing maintenance up to 2025-26. There is the
potential to extend the continued upkeep of the pitches until 2026-27 given the
earmarking available will not be fully utilised by the end of 2025-26.  However, there
will be potential redundancy costs for 2 employees that will need to be covered from
the remaining balance. Paper on proposed extension to be prepared.
88,307 199,528 0
142 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Green Transport Initiatives 140,000 0 140,000 140,000 0 At the Council meeting on 27 February 2020, it was agreed to input £400k in Green
transport, investment in footway and cycle path maintenance supporting the healthy
wellbeing and green agenda.  Spend has been delayed due to COVID and this will be
taken forward in 23/24. £260k Footways Reconstruction programme now spent and
will be drawn down against capital programme during 23/24. £140k Ardrishaig North
Project spent in 22/23 and drawn down in 24/25 (capital expenditure).
140,000 0 0

Page 111

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
146 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Climate Change 40,942 0 40,942 40,942 0 At the Council meeting on 27 February 2020, it was agreed to input £500k budget to
mitigate the impacts of weather related damage and climate change with specific
emphasis on gully cleaning and drainage improvements.  Spend has been delayed
due to COVID and the intention is to spend the funds on 2 Gully Motors plus staff
over next 2 years. Vehicles have been received and budget will be drawn down to
cover their cost. The remaining budget will be used towards running the vehicles.
40,942 0 0
147 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Amenity Services introduction of
management information system
28,099 0 0 0 0 Delay with introduction of amenity time recording system due to increased costs. 
Discussions ongoing to find alternative cheaper solution.  The software/system being
introduced by HR/Payroll during 2023-24 offers a time-recording facility.  Although
not included in the current HR/Payroll spec, once the new system is up and running,
the proposal would be to investigate the time-recording system to see if viable for
amenity time recording purposes.
Balance released back to General Fund per Council decision September 24 as there is
no plan to take this forward and this will be re-assessed following the introduction of
the HR/Payroll system.
0 0 0
149 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Services
(2023 Contract Inflation Adjustments)
Waste PPP
223,261 0 0 0 0 Proposal to merge with ref 134, to be used to assist with the Council's compliance
with the 2026 ban on the Landfill of Biodegradable Municipal Waste and supporting
the overall Waste Strategy.  Council agreed to merge 134 and 149 September 24.
0 0 0
151 Executive Director (Kirsty Flanagan) Roads and
Infrastructure
Services
Weather Incident costs not covered by
Bellwin claim.
198,000 0 198,000 198,000 0 £839k was set aside at budget meeting in February 2024 as part of the unallocated
general fund balance workings to cover the weather incident costs not covered by
the Bellwin Claim.  As £641k was utilised during 23-24, the balance of £0.198m is
being earmarked for costs expected in 24-25.
198,000 0 0
154 Non Departmental Non Departmental Service Concessions - Replace previous
loans fund principal repayment holiday
5,400,000 0 5,400,000 5,400,000 0 As agreed at Council meeting 23 February 2023 - The one-off retrospective benefit
will be used to replace exercising the principal repayment holiday that was previously
agreed by Council.
5,400,000 0 0
164 Non Departmental Non Departmental Pay Inflation Contingency 1,700,000 0 1,700,000 1,700,000 0 Negotiations for the 2024/25 pay award are ongoing but initial discussions suggest it
will be beyond the 3% increase currently built into the budget outlook. £1.7m
equates to approximately a 1% pay rise therefore providing a contingency at this
level is prudent
1,700,000 0 0
170 Non Departmental Non Departmental Underwriting development of Rothesay
Pavilion
1,000,000 0 0 0 0 Funding to meet additional costs identified as necessary for the refurbishment of
Rothesay Pavilion (£1m).
At Council Meeting September 24, it was agreed to merge the 4 capital earmarkings
for Rothesay Pavilion into one line with the narrative indicating the sources. 
Earmarkings 012, 155, 167 and 170 combined under reference 155.
0 0 0
171 Non Departmental Non Departmental Oban TIF (Tax Incremental Financing -
Excess NDR)
875,651 0 875,651 0 875,651 This is the surplus NDR after paying all Loans Charges in respect of TIF infrastructure
projects.  This fund will be used in the future as TIF projects are delivered.  
Discussions in place on future ff the next TIF project (Oban Airport) which will utilise
this reserve.  If the project does not go ahead, we will need to return NDR to Scottish
Government
0 875,651 0
180 Non Departmental Non Departmental Treasury Gain 294,000 294,000 0 0 0 To fund one off operational saving 202425 003 as agreed by Council when setting
2024/25 budget in February 2024.
294,000 0 0
184 Non Departmental Non Departmental Information Management (Balance of
Funding)
200,469 0 200,469 200,469 0 To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of
change as outlined in the BV Review.  This was the balance of funding to explore
information management solutions in a strategic and coherent way £209k. 
Committed for MS 365 project - D Logan/I Jackson. Paper went to DMT in Dec.
200,469 0 0
186 Non Departmental Non Departmental Engagement with Hub North re provision of
services for older adults and vulnerable
people across Argyll and Bute
100,000 0 100,000 30,000 70,000 At the Council budget meeting February 23, an allocation of £0.1m from the
Unallocated General Fund balance for the Health and Social Care Partnership to
engage, in partnership with the Council, with Hub North to develop a strategic
business case in relation to the provision of services for older adults and other
vulnerable people across Argyll and Bute.  It is intended that this will be spent on an
on-going business case and options appraisal work with Hub and that a sizable
proportion will be spent during 24/25
30,000 70,000 0

Page 112

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
187 Non Departmental Non Departmental Spend to Save Route Optimisation Software 82,775 0 82,775 4,800 77,975 One-off re-profiling gain as a result of the loans fund review to fund known
liabilities/cost pressures as agreed at budget setting meeting in February 2020.  The
route optimisation project has been delayed due to staff turnover and absences,
recent meetings involving the Council and Routewear have set out future objectives
and the project has been extended to 2025-26.
4,800 77,975 0
188 Non Departmental Non Departmental CHARTS 80,000 55,000 25,000 25,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to
£0.075m one-off investment in CHARTS in response to an external funding request
will be spent in 24-25. There remains £0.005m from a COVID earmarking for CHARTS
as well.
80,000 0 0
194a Non Departmental Non Departmental Council Strathclyde Pension Fund Saving 24-
25 (£2m to balance 24-25 budget)
2,000,000 0 0 0 This is part of the revenue budget for 24-25 and is the saving on pension budgets
resulting from the drop in employers pension rate.  The total of £6.875m is split as
follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget
meeting 22 February 24 and the balance of £1.125m going towards what will be total
of £2m over the two years pot to be directed to transformation and projects that will
save revenue in the future.
2,000,000
194b Non Departmental Non Departmental Council Strathclyde Pension Fund Saving 24-
25 (£3.75m allocation to capital plan)
0 3,750,000 0 3,750,000 This is part of the revenue budget for 24-25 and is the saving on pension budgets
resulting from the drop in employers pension rate.  The total of £6.875m is split as
follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget
meeting 22 February 24 and the balance of £1.125m going towards what will be total
of £2m over the two years pot to be directed to transformation and projects that will
save revenue in the future.
0 3,750,000
194c Non Departmental Non Departmental Council Strathclyde Pension Fund Saving 24-
25 (£2m to be directed to transformation
and projects that will save revenue in the
future)
0 1,125,000 0 1,125,000 This is part of the revenue budget for 24-25 and is the saving on pension budgets
resulting from the drop in employers pension rate.  The total of £6.875m is split as
follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget
meeting 22 February 24 and the balance of £1.125m going towards what will be total
of £2m over the two years pot to be directed to transformation and projects that will
save revenue in the future.
1,125,000
195 Non Departmental / Social Work Non Departmental Social Work Strathclyde Pension Fund
Saving 24-25
0 3,053,000 0 3,053,000 This is part of the revenue budget for 24-25 and is the saving on Social Work pension
budgets resulting from the drop in employers pension rate - to be held in Council
reserves for utilisation by the HSCP in future. 
3,053,000
196 Non Departmental Non Departmental Capital Plan 0 1,875,000 0 1,875,000 At the budget meeting on 22 February 2024, Council agreed to transfer £1.875m
from the revenue budget over to the capital plan.
1,875,000
18,509,179 3,685,312 25,181,764 10,047,636 15,134,128 13,732,948 5,061,694 10,072,434

Page 113

Classification: OFFICIAL#
APPENDIX 2
Earmarked Reserves - Service Concessions
As at 31 December 2024
Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
001 Chief Executive's Unit Community
Planning
Service Concessions - Priorities Investment
Fund (Area Plans)
200,000 86,838 113,162 13,162 100,000 As agreed by Policy and Resources Committee on 23 October 23 -
drawdown of £200,000 from the Priorities Investment Fund to fund two
temporary posts and associated costs to produce meaningful area plans
100,000 100,000 0
105 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Service Concessions - Priorities Investment
Fund (Project Officer for Housing
Emergency)
200,000 0 200,000 70,000 130,000 As agreed by Policy and Resources Committee on 15 February 2024 -
drawdown of £200,000 from the Priorities Investment Fund to fund a
Project Officer to assist in accelerating the work of the Housing Emergency.
Dec 24 post holder now in place awaiting further instruction from Budget
holder
70,000 130,000 0
133 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Service Concessions - Biodegradable
Municipal Waste (BMW) Ban
3,500,000 0 3,500,000 0 3,500,000 As agreed at Council meeting 23 February 2023 - Ensuring Argyll and Bute
is able to better address the challenges faced by a remote/rural/ island
region in complying with the forthcoming national BMW ban.  
£1.5m earmarked for revenue pressures with £2m for capital projects,
mainly a Waste Transfer Station in Helensburgh.
0 3,500,000 0
138 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Service Concessions - Priorities Investment
Fund (Strategic Development Framework)
450,000 0 450,000 225,000 225,000 As agreed by Policy and Resources Committee on 15 February 2024 -
drawdown of £450,000 to procure consultancy support to assist in driving
forward the Strategic Development Frameworks.
225,000 225,000 0
153 Non Departmental Non Departmental Service Concessions - Learning Estate
Investment Strategy
8,000,000 0 8,000,000 0 8,000,000 As agreed at Council meeting 23 February 2023 - Signalling council’s
commitment to working in partnership to secure new schools for Argyll
and Bute, through substantial investment to support future-proofing of
Argyll and Bute’s schools estate.
0 8,000,000 0
154 Non Departmental Non Departmental Service Concessions - Replace previous
loans fund principal repayment holiday
5,400,000 0 5,400,000 5,400,000 0 As agreed at Council meeting 23 February 2023 - The one-off retrospective
benefit will be used to replace exercising the principal repayment holiday
that was previously agreed by Council.
5,400,000 0 0
155 Non Departmental Non Departmental Rothesay Pavilion - Capital Spends
(previously service concession)
7,438,400 0 7,438,400 1,000,000 6,438,400 Original earmarking 155 was called Service Concessions - Rothesay Pavilion
but renamed to Rothesay Pavilion - Capital spends.  At Council Meeting
September 24, it was agreed to merge the 4 capital earmarkings for
Rothesay Pavilion into one line with the narrative indicating the sources. 
Earmarkings 012, 155, 167 and 170 combined under reference 155.
ER155 - Service Concessions - Rothesay Pavilion £4.772m - As agreed at
Council meeting 23 February 2023 - Building on previous commitments to
securing a future for this building of international, national and local
significance with additional contribution to the overall funding target
which requires collective action; helping project to progress towards
success with funding that supports completion of certain work stages and
securing wind/watertight status.
ER012 - Rothesay Pavilion Essential Repairs £306k - Essential repairs to
deal with potential health and safety risks and to avoid further
deterioration.  Budget provision was approved by the Policy and Resources
Committee on 21 August 2014.
ER167 - Rothesay Pavilion (Recovery and Renewal Fund)  - £1.360m- As
agreed at Council on 24 February 2022, this is provision for future
recovery, regeneration and renewal, as well as any future pressures which
may arise following the Covid-19 pandemic through a dedicated Recovery
and Renewal Fund.
ER170 - Underwriting development of Rothesay Pavilion - Funding to meet
additional costs identified as necessary for the refurbishment of Rothesay
Pavilion (£1m).
1,000,000 6,438,400 0
156 Non Departmental Non Departmental Service Concessions - Priorities Investment
Fund
4,742,000 758,000 3,984,000 0 3,984,000 As agreed at Council meeting 23 February 2023 - Safeguarding future
investment in Priorities for Argyll and Bute by making long-term use of
service concession gain to establish dedicated fund to lever in, secure and
support key strategic investments in this year and future years.
758,000 3,984,000 0
157 Non Departmental Non Departmental Service Concessions - Roads Investment to
Capital
3,546,000 0 3,546,000 0 3,546,000 As agreed at Council meeting 23 February 2023 - Augmenting overall
allocation for roads repair and maintenance programme with additional
funds to bring up to £8m total investment for 2024/25.
0 3,546,000 0

Page 114

Classification: OFFICIAL#
163 Non Departmental Non Departmental Service Concessions - Capital Projects
Inflation Pressures
2,000,000 0 2,000,000 0 2,000,000 As agreed at Council meeting 23 February 2023 -Boosting resilience of
Capital Programme and providing added support as required for key
capital/infrastructure projects - £2m.
Further allocation agreed Council meeting 22 February 24 - increase capital
contract earmarking to protect current capital projects in plan £0.297m
0 2,000,000 0
169 Non Departmental Non Departmental Service Concessions - Priorities Investment
Fund (Capital Programme)
1,028,000 0 1,028,000 0 1,028,000 As agreed by Council on 22 February 2024- transfer of £1,028,000 from the
Priorities Investment Fund to the Capital plan
1,028,000 0
173 Non Departmental Non Departmental Service Concessions - New refuse collection
vehicles
700,000 0 700,000 700,000 0 As agreed at Council meeting 23 February 2023 - Enhancing waste and
recycling uplift arrangements through placing orders for new refuse
vehicles.
700,000 0 0
175 Non Departmental Non Departmental Service Concessions - Climate Change 640,000 27,185 612,815 0 612,815 As agreed at Council meeting 23 February 2023 - Continuing our track
record of investing in climate change with funding to further enhance
school estate climate change measures, with allocations for primary and
secondary schools across the area in Campbeltown, Dunoon, Helensburgh,
Lochgilphead, Oban and Rothesay.
27,185 612,815 0
182 Non Departmental Non Departmental Service Concessions - New Jet Patcher
Vehicle
250,000 0 250,000 250,000 0 As agreed at Council meeting 23 February 2023 - Complementing multi-
million pound capital investment in roads repair and maintenance with
new jet patcher order to support delivery of programme.
250,000 0 0
183 Non Departmental Non Departmental Service Concessions - New Road Marking
Vehicle
230,000 0 230,000 0 230,000 As agreed at Council meeting 23 February 2023 - Completing suite of
investments in new fleet procurement, to support delivery of roads repair
and maintenance programme, with order for additional road marking
vehicle.
0 230,000 0
38,324,400 872,023 37,452,377 7,658,162 29,794,215 8,530,185 29,794,215 0