Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
1 May 2025 
NOTICE OF MEETING 
A meeting of the POLICY AND RESOURCES COMMITTEE will be held ON A HYBRID BASIS IN
THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS on
THURSDAY, 8 MAY 2025 at 10:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
3. MINUTES (Pages 3 - 10)  
Policy and Resources Committee held on 20 February 2025 
4. BUDGET OUTLOOK 2026-27 TO 2030-31 (Pages 11 - 28)  
Report by Section 95 Officer 
5. HEALTH AND SOCIAL CARE PARTNERSHIP – FINANCIAL POSITION 
(Pages 29 - 34)  
Report by Section 95 Officer 
6. EMPTY PROPERTY RELIEF FOR BUSINESSES - POLICY UPDATE 
(Pages 35 - 42)  
Report by Executive Director with responsibility for Finance
* 7. CORPORATE PLAN 2025 - 2027 (Pages 43 - 68)  
Report by Executive Director with responsibility for Customer Support Services
* 8. ARTIFICIAL INTELLIGENCE POLICY (Pages 69 - 84)  
Report by Executive Director with responsibility for Customer Support Services 
Public Document Pack

Page 2

9. ARGYLL AND BUTE EQUALITY MAINSTREAMING REPORT 2025 
(Pages 85 - 114)  
Report by Executive Director with responsibility for Customer Support Services 
10. ITRENT HR AND PAYROLL SYSTEMS REPLACEMENT PROJECT UPDATE
(Pages 115 - 134)  
Report by Executive Director with responsibility for Customer Support Services and
Financial Services 
11. PROPOSED AMENDMENT TO THE AGE AT WHICH AN LGPS EMPLOYEE CAN
MAKE AN APPLICATION FOR FLEXIBLE RETIREMENT (Pages 135 - 140)  
Report by Executive Director with responsibility for Customer Support Services 
12. PLACE BASED INVESTMENT 2025/26 - PLACE BASED INVESTMENT
PROJECTS AND ALLOCATION & CROWN ESTATE 2025/26 - UPDATE 
(Pages 141 - 148)  
Report by Executive Director with responsibility for Development and Economic
Growth 
13. HELENSBURGH WASTE TRANSFER STATION PROJECT UPDATE 
(Pages 149 - 158)  
Recommendation from meeting of Environment, Development and Infrastructure
Committee held on 20 March 2025 
REPORT FOR NOTING 
14. POLICY AND RESOURCES COMMITTEE WORKPLAN (Pages 159 - 162) 
The above minutes are submitted to the Council for approval of any recommendations on the
items which the Committee does not have delegated powers. These items are marked with an *. 
Policy and Resources Committee 
Councillor John Armour Councillor Gordon Blair
Councillor Math Campbell-Sturgess Councillor Audrey Forrest (Vice-Chair)
Councillor Kieron Green Councillor Amanda Hampsey
Councillor Mark Irvine Councillor Reeni Kennedy-Boyle
Councillor Jim Lynch (Chair) Councillor Luna Martin
Councillor Liz McCabe Councillor Dougie McFadzean
Councillor Yvonne McNeilly Councillor Ross Moreland
Councillor Gary Mulvaney Councillor Dougie Philand   
Contact: Hazel MacInnes, Senior Committee Officer  Tel:01546 604269

Page 3

MINUTES of MEETING of POLICY AND RESOURCES COMMITTEE held in the ON A
HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY
MICROSOFT TEAMS 
on THURSDAY, 20 FEBRUARY 2025 
Present: Councillor Jim Lynch (Chair) 
Also present:
Councillor John Armour
Councillor Gordon Blair
Councillor Math Campbell-Sturgess
Councillor Audrey Forrest
Councillor Kieron Green
Councillor Amanda Hampsey 
Councillor Jan Brown
Councillor Fiona Howard 
Councillor Reeni Kennedy-Boyle
Councillor Luna Martin
Councillor Dougie McFadzean
Councillor Yvonne McNeilly
Councillor Ross Moreland
Councillor Gary Mulvaney 
Councillor Tommy Macpherson
Councillor Peter Wallace
Attending: Pippa Milne, Chief Executive
Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director
Carolyn Earl, Interim Head of Financial Services 
Jane Fowler, Head of Customer and Support Services 
Ross McLaughlin, Head of Commercial Services
Fergus Murray, Head of Development and Economic Growth 
Suzanne Mason, Engagement and Communities Lead
Shona Barton, Governance Manager
Jonathan Welch, Transformational Projects and Regeneration Manager
Fergus Walker, Revenues and Benefits Manager 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Mark Irvine and Liz McCabe. 
2. DECLARATIONS OF INTEREST (IF ANY) 
There were no declarations of interest intimated. 
3. MINUTES 
The Minutes of the meeting of the Policy and Resources Committee held on 5
December 2024 were approved as a correct record. 
* 4. FINANCIAL REPORTS MONITORING PACK - 31 DECEMBER 2024 
The Committee gave consideration to a report providing a summary of the financial
monitoring reports as at 31 December 2024. 
Decision 
The Policy and Resources Committee agreed to – 
1. note the revenue budget monitoring report as at 31 December 2024; 
Page 3 Agenda Item 3

Page 4

2. note the financial risks for 2024-25; 
3. note the capital plan monitoring report as at 31 December 2024 and approve the
proposed changes to the capital plan outlined in Appendix 4 of that report; and 
4. note the reserves and balances report as at 31 December 2024. 
(Reference: Report by Section 95 Officer dated 17 January 2025, submitted) 
Councillor Luna Martin left the meeting during consideration of the next item of
business. 
* 5. BUDGETING PACK 2025-26 
The Committee gave consideration to the full package of papers included in the
budgeting pack in relation to the revenue and capital budgets for 2025-26. 
Decision 
The Policy and Resources Committee agreed to refer consideration of the Budgeting
Pack 2025-26 to the Council meeting on 27 February 2025, without
recommendation. 
(Reference: Budgeting Pack 2025-26 dated 13 February 2025, submitted) 
* 6. TREASURY MANAGEMENT STRATEGY AND ANNUAL INVESTMENT
STRATEGY 2025-26 
The Committee gave consideration to a report presenting the draft Treasury
Management Strategy and Annual Investment Strategy for 2025-26, and the
Prudential and Treasury Indicators for 2025-26 to 2027-28.   
Decision 
The Policy and Resources Committee – 
1. noted the Treasury Management Strategy and Annual Investment Strategy for
2025-26, and the Prudential and Treasury Indicators for 2025-26 to 2027-28; and 
2. agreed to refer the report to full Council for approval. 
(Reference: Report by Section 95 Officer dated 10 February 2025, submitted) 
7. ARGYLL AND BUTE UK SHARED PROSPERITY FUND INVESTMENT PLAN,
TRANSITION YEAR 2025/26 
The Committee gave consideration to a report presenting the Argyll and Bute UK
Shared Prosperity Fund (UKSPF) Transitional Year Investment Plan for 2025/26. 
Decision 
The Policy and Resources Committee – 
Page 4

Page 5

1. noted the content of the report; 
2. approved the Argyll and Bute UKSPF Transitional Year Investment Plan for
2025/26; and 
3. agreed that a progress report on the investment plan for 2025/26 would be
presented at the Policy and Resources Committee in October 2025. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 6 February 2025, submitted) 
8. FUTURE OF THE ARGYLL AND BUTE FLEXIBLE FOOD AND FUEL FUND 
The Committee gave consideration to a report presenting a contingency plan for
funding the Argyll and Bute Flexible Food and Fuel Fund for 2025/26, leveraging a
combination of the UK Shared Prosperity Fund (SPF) and earmarked reserves for
Revenues and Benefits administration works. 
Decision 
The Policy and Resources Committee – 
1. acknowledged the work done to date to directly support people to cope with food
and fuel poverty and other cost of living pressures, with over £4.3m in financial
benefits delivered and almost 2,000 households and 800 children receiving the
help that they need; 
2. recognised the importance of extending the fund so that people in Argyll and Bute
who need help can continue to get support; 
3. welcomed and agreed the plan to extend the Flexible Food and Fuel Fund to 31
March 2026, supported by the following funding sources: 
• UK Shared Prosperity Fund (60% of £204,000): £122,400 
• Earmarked reserves: £189,600 
• Total cost for 2025/26: £312,000 
4. noted the recent correspondence to the Committee from Argyll and Bute Citizen’s
Advice Bureau and agreed that officers would continue to explore potential for
any future additional partnership working that may be possible. 
(Reference: Report by Executive Director with responsibility for Finance dated 13
January 2025, submitted) 
9. SUPPORTING COMMUNITIES FUND 2025-26 
The Committee gave consideration to a report detailing proposals for an improved
process for the Supporting Communities Fund in 2025/26, adding to the outlined
proposals approved by Policy & Resources Committee in December 2024. 
Decision 
Page 5

Page 6

The Policy and Resources Committee agreed – 
1. a focus on digital first with promotion of an online application; 
2. non-digital application available if needed to ensure fairness and equality; 
3. a shorter application – one of the key asks from the community survey; 
4. maximum funding which can be applied reduced from £2,500 to £1,500 - allowing
more community groups to be awarded funding; 
5. groups eligible to apply continue to be all third sector organisations in Argyll and
Bute, with additional criteria of: ‘who have a turnover of £150,000 or less’; and 
6. funding is to remain available for projects that come under one or more of the
following criteria: Fairer, Resilient, Greener and Creative. 
(Report by Chief Executive dated 29 January 2025, submitted) 
* 10. SUSTAINABLE PROCUREMENT STRATEGY 2025/2028 - DRAFT DOCUMENT
AND CONSULTATION 
The Committee gave consideration to a report seeking approval for the draft revised
Sustainable Procurement Strategy 2025/2028. 
Decision 
The Policy and Resources Committee – 
1. noted the key changes to the Sustainable Procurement Strategy 2025/2028, and
the changes made to the strategy following the consultation period; and 
2. recommended to the Council agreement of the revised final Sustainable
Procurement Strategy 2025/2028, and the publication on the council’s website in
April 2025 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support dated 17 December 2024, submitted) 
11. EQUALITY OUTCOMES 2025-2029 
The Committee gave consideration to a report detailing work which has been
undertaken to develop a new set of Equality Outcomes which will cover the period
May 2025 to April 2029 as required to comply with the Public Sector Equality Duty. 
Decision 
The Policy and Resources Committee approved the following set of Equality
Outcomes for the period 2025-2029 – 
1. We make access to information and services easier for people with protected
characteristics. 
Page 6

Page 7

2. Our communities are safe for, and welcoming to, people with protected
characteristics. 
3. We raise awareness of issues and challenges faced by people with protected
characteristics along with ways to accommodate and support them. 
4. Argyll and Bute welcomes New Scots and supports them. 
5. We ensure people with protected characteristics are enabled to progress. 
6. Our work relating to equalities and people with protected characteristics is
coordinated across the organisation and its partners and is strategically aligned. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services dated 14 January 2025, submitted) 
12. CONSERVATION AREA REGENERATION SCHEME (CARS) PROJECT 15-19
ARGYLL STREET, LOCHGILPHEAD 
The Committee gave consideration to a report seeking approval to award an
additional Private Sector Housing Grant of £21,220, to help bridge the budget
shortfall for external building works at 15-19 Argyll Street, Lochgilphead. 
Decision 
The Policy and Resources Committee approved utilisation of the £21,220 balance of
Private Sector Housing Grant allocated to the Lochgilphead CARS projects by Full
Council on 21st February 2019 to bridge the funding shortfall at the 15-19 Argyll
Street Lochgilphead CARS project. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 6 January 2025, submitted) 
13. COMMUNITY REGENERATION PARTNERSHIP FUNDING 
The Committee gave consideration to a report detailing 5 priority projects to put
forward for potential funding from the Community Regeneration Partnership. 
Decision 
The Policy and Resources Committee – 
1. approved the updated list of priority projects included at Appendix 1 of the report,
which will form the basis of further negotiations with the UK and Scottish
Governments; and 
2. noted that all funding requires to be committed by financial year 26/27 and would
be subject to business case approvals by Ministry of Housing, Communities and
Local Government Ministers. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated January 2025, submitted) 
Page 7

Page 8

14. CROWN ESTATES FUNDING  ALLOCATION 2025/26 
The Committee gave consideration to a report setting out proposals for the allocation
of the remaining Crown Estates budget allocated in the 2024/25 financial year. 
Decision 
The Policy and Resources Committee – 
1. considered and approved the time sensitive proposals set out in Table 1 of the
report for the remaining Crown Estates budget allocated in the 2024/25 financial
year; and 
2. noted that a further report would be brought back to the Policy and Resources
Committee identifying priority projects for the 2025/26 Crown Estates funding
allocation. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 16 January 2025, submitted) 
* 15. STRATEGIC EVENTS AND FESTIVALS FUND - ROUND 7 2025-26 
The Committee gave consideration to a report providing an update on Round 7
(2025/26) of the Council’s Strategic Events and Festivals Fund (SEF) and details of
the applications submitted and the applications recommended to receive funding. 
The report also sought agreement to allocate a minimum of £90,000 funding to allow
for a SEF Round 8 in 2026/27. 
Decision 
The Policy and Resources Committee– 
1. agreed to the award of eligible SEF Round 7 grants amounting to £106,036 as
detailed in Table 1 of the report;  
2. agreed that any SEF Round 7 grant offer be formally issued upon confirmation
from the event organisation that the event is confirmed as going ahead, match
funding is in place and the event still meets the SEF Round 7 criteria; 
3. agreed to continue delegation of powers to the Executive Director with
responsibility for Development and Economic Growth to allow any subsequent
amendment to existing grant requests due to changes to the event/event budget.
Any amendment to a current grant request/offer would only be considered if the
amendment related to either the same level or a reduction in the request and
constitute up to 75% of legitimate and eligible expenditure. Similarly, if there was
a reduction in the final event costs that would result in delivery of a profit more
than £10,000 (all of which must be reinvested to future events) to the
organisation and that this was sustained over a 3-year period, the final retention
(10%) would not be paid out on the third year of the grant; 
4. agreed to recommend to Council that as part of the budget in February 2025, that
they agree a minimum of £90,000 base funding for Strategic Events and Festivals
in order that the application process can commence for Round 8 (2026/27); and 
Page 8

Page 9

5. agreed and recommended to Council that any underspend from SEF Round 6
(2024/25) was earmarked and used to augment a future SEF round. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 6 December 2024, submitted) 
16. ROYAL NATIONAL MOD 2028 
The Committee gave consideration to a report seeking approval in principle on An
Comunn’s offer for Argyll and Bute to host the Royal National Mòd (RNM) in 2028. 
Decision 
The Policy and Resources Committee – 
1. agreed in principle to hosting the RNM in Dunoon or Oban in 2028 and for the
requirement to enter into an agreement with An Comunn to provide a maximum
of £200K financial support over a four year period with the final payment in
financial year 2028-2029;  
2. agreed to the Council working with Live Argyll to secure the use of the venues for
the duration of the RNM at no cost to the RNM; and 
3. noted that the An Comunn Board meet in March 2025 and had requested that the
Council provide an in principle decision by this date. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 5 February 2025, submitted) 
17. POLICY AND RESOURCES COMMITTEE WORK PLAN 
The Policy and Resources Committee Workplan was before the Committee for
noting. 
Decision 
The Policy and Resources Committee noted the content of the Workplan as at 20
February 2025. 
(Reference: Policy and Resources Committee Workplan dated 20 February 2025,
submitted) 
Page 9

Page 10

This page is intentionally left blank

Page 11

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 8 MAY 2025
BUDGET OUTLOOK 2026-27 TO 2030-31  
1. EXECUTIVE SUMMARY 
1.1 This report summarises the Budget Outlook for the five year period 2026-27 to
2030-31, taking account of the budget decisions approved at the Council
meeting on 27 February 2025.  This is the first outlook report of the new
financial year, rolling forward previous forecasts and extending the period to
2030-31, as well as updating planning assumptions, as appropriate.  These
assumptions will continue to be updated and refined on an ongoing basis
throughout the year. 
1.2 The Budget Outlook has been prepared using three different scenarios, best
case, worst case and mid-range.  The detailed information focusses primarily
on the mid-range scenario, however, all three scenarios are outlined within
Appendix 1. 
1.3 
1.4 
There has been no change to assumptions in respect of future years’ Scottish
Government funding since those reported as part of the Budget Pack on 27
February 2025.  Despite an unexpected effective increase of 1.47% in our
2025-26 settlement, it would be imprudent to assume similar increases in future
years, with increases over the previous 3 years being as low as 0.01%. At this
stage, a Scottish average increase of 0.5% for the mid-range, with a variation
of 0.5% for the best and worst case scenarios, are the suggested planning
assumptions.  As this council relies on the floor mechanism to protect its
funding level, our settlement is lower than the Scottish average change.  The
floor was set at 0.75% below the Scottish average in 2025-26 and is likely to
continue at this level.  As such, funding assumptions for this council range
between an increase of 0.25% (best case) and a reduction of 0.75% (worst
case), with a reduction of 0.25% in the mid-range scenario.   
At this stage, it continues to be deemed prudent not to assume that funding
received in respect of Packaging Extended Producer Responsibility from the
Department of Environment, Food and Rural Affairs (DEFRA) in 2025-26 will
be recurring in 2026-27 and future years, without a reduction in Scottish
Government grant funding.  Funding conditions and future years budget
pressures remain unclear and the final allocation for 2025-26 is not expected to
be confirmed until the autumn. 
1.5 There are no changes to previous assumptions in respect of Council Tax
growth.  The Council Tax base is assumed to grow by 0.25% in the worst case,
0.5% in the mid-range and 0.75% in the best case scenarios. 
1.6 Assumptions in respect of employee costs for council services are as follows: 
Page 11 Agenda Item 4

Page 12

 The Public Sector Pay Policy, published alongside the Scottish Budget, sets
out a multi-year framework of a 9% pay envelope covering 2025-26, 2026-
27 and 2027-28.  A planning assumption of 3% across each of these years
has been applied in both the best case and mid-range scenarios, with 5%
assumed in the worst case scenario.  For 2028-29 and 2029-30, the best
case scenario has been reduced to 2%, while the mid-range remains at 3%
and worst case remains at 5%.  
 The SJC and Chief Officers pay awards for 2025-26 have still to be agreed
and may have an impact on the base budget if the pay award is higher than
the 3% allowed for in the budget. The Teachers pay award now covers the
period August to July and for 2025-26 has already been agreed up to 31
July 2025, however, any increase beyond that date is still in the negotiation
stage.
 The cost of pay increments for 2025-26 is estimated at £0.599m.  For future
years, an equivalent cost has been assumed in the mid-range and worst
case scenarios, while half the estimated 2025-26 cost has been assumed in
the best case scenario. 
1.7 For non-pay inflation, only unavoidable inflation has been provided for within
each scenario, with the mid-range scenario based on current market forecast
data, where available.  A further general inflation contingency has been built
into the mid-range and worst case scenarios.  Due to current market volatility
and prevalent levels of uncertainty, at this stage, there has been no change to
the inflationary assumptions included within the 2025-26 Budget Pack. 
1.8 There are a number of cost and demand pressures for council services built
into each scenario, across all five years, comprising the following: 
 ASN Support
 Election Costs
 Education ICT Network Infrastructure
 Planning (Local Development Plan)
 Universal Credit – HB Admin grant 
 Civica Revenue and Benefits Management System 
 Compliance with BMW Ban 
 Bus Transport Contracts
 Migration to Teams Telephony
 Valuation Joint Board 
1.9 In addition to the identified cost and demand pressures, a general allowance
for currently unforeseen or unquantifiable cost and demand pressures has
been included in each scenario (best case £0.250m, mid-range £0.500m and
worst case £1m per year). 
1.10 Political decisions will require to be made in respect of the allocation to the
Health and Social Care Partnership in future years.  As part of the 2025-26
budget process, indicative base allocations of £85.045m were agreed for 2026-
27 and 2027-28, with future years’ allocations being subject to Scottish
Government grant funding and the council’s overall financial position. The
Page 12

Page 13

indicative allocation for 2026-27 represents an increase of £3.053m to flat
cash, reflecting the non-recurring saving in relation to the Strathclyde Pension
Fund contribution. 
1.11 The budget gap in the mid-range scenario, prior to measures to balance the
budget, either from previous savings decisions or new potential options, is
estimated at £14.442m in 2026-27 and £58.195m over the five year period
2026-27 to 2030-31. 
1.12 The measures to balance the budget over the next five years are as follows: 
 Proposed increases to fees and charges of between 3% and 9% each year
(6% mid-range).
 Proposed increases to Council Tax at 5% each year for all scenarios.
 Management/Operational and Policy savings already agreed by Council in
February 2025 and previous years. 
1.13 The budget gap in the mid-range scenario, after measures to balance the
budget, is estimated at £9.568m in 2026-27 and £33.846m over the five year
period 2026-27 to 2030-31.   
1.14 The budget gap in the best case scenario is estimated at £6.068m in 2026-27
and £13.415m over five years, increasing to £16.159m in 2026-27 and
£67.384m over five years in the worst case scenario.  A summary of all three
scenarios is included within Appendix 1.  
1.15 It is recommended that the Policy and Resources Committee consider the
current Budget Outlook position for the period 2026-27 to 2030-31. 
Page 13

Page 14

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 8 MAY 2025
BUDGET OUTLOOK 2026-27 TO 2030-31 
2. INTRODUCTION 
2.1 This report summarises the Budget Outlook for the 5-year period 2026-27 to
2030-31, taking account of the budget decisions approved at the Council
meeting on 27 February 2025.  This is the first outlook report of the new
financial year, rolling forward previous forecasts and extending the period to
2030-31, as well as updating planning assumptions, as appropriate.  These
assumptions will continue to be updated and refined on an ongoing basis
throughout the year. 
2.2 The Budget Outlook has been prepared using three different scenarios, best
case, worst case and mid-range.  Relatively small variations in assumptions can
lead to fairly significant changes in the outcome.  In the paragraphs that follow,
the mid-range outlook is shown, however, all three scenarios are detailed within
Appendix 1. 
3.  RECOMMENDATIONS 
3.1  It is recommended that the Policy and Resources Committee consider the
current Budget Outlook position for the period 2026-27 to 2030-31.
4. DETAIL 
4.1 Funding 
Scottish Government Finance Settlement 
4.1.1 
4.1.2 
Estimates of future Scottish Government funding levels is one of the key
assumptions within the Budget Outlook.  Whilst council’s are recommended to
prepare longer term financial plans, with a focus on financial sustainability, this
is more challenging with one year Scottish Government finance settlements.
Council’s will continue to lobby via COSLA for multi-year settlements to assist
with longer term financial planning. 
As part of the 2025-26 budget setting process, members were advised that
despite an unexpected effective increase of 1.47% in our 2025-26 settlement, it
would be imprudent to assume similar increases in future years, with increases
over the previous 3 years being as low as 0.01%. There has been no change to
assumptions in respect of future years’ Scottish Government funding since
those reported as part of the Budget Pack on 27 February 2025.  At this stage, a
Scottish average increase of 0.5% for the mid-range, with a variation of 0.5% for
the best and worst case scenarios, are the suggested planning assumptions. As
this council relies on the floor mechanism to protect its funding level, our
Page 14

Page 15

settlement is lower than the Scottish average change.  The floor was set at
0.75% below the Scottish average in 2025-26 and is likely to continue at this
level.  As such, our funding assumptions range between an increase of 0.25%
(best case) and a reduction of 0.75% (worst case), with a reduction of 0.25% as
the mid-range scenario.         
4.1.3  The table below summarises the mid-range scenario estimates based on a
0.25% settlement reduction year on year.  This includes additional funding in
respect of increased Employer’s National Insurance Contributions. 
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Estimated SG Funding 261,058 260,406 259,755 259,106 258,459 
4.1.4 At this stage, it continues to be deemed prudent not to assume that funding
received in respect of Packaging Extended Producer Responsibility from the
Department of Environment, Food and Rural Affairs (DEFRA) in 2025-26 will be
recurring in 2026-27 and future years, with no reduction in Scottish Government
grant funding.  Funding conditions and future years budget pressures remain
unclear and the final allocation for 2025-26 is not expected to be confirmed until
the autumn. It was agreed as part of the 2025-26 budget process that £2.499m
of the estimated 2025-26 funding of £3.847m would be carried forward for use in
2026-27. 
Council Tax 
4.1.5 The Council Tax base for 2025-26 is set at £70.204m, which reflects the 9.9%
increase agreed by the Council on 27 February 2025. 
4.1.6 There are no changes to previous assumptions around the growth in Council
Tax. It has been assumed that there will be 0.5% growth in the mid-range
scenario for all years from 2026-27 (0.75% in the best and 0.25% in the worst
case scenarios). Following the setting of Council Tax in February, the future
years estimates have been updated reflecting the adjusted base Council Tax
Budget. 
4.1.7  In the first instance, this report presents the budget gap, prior to any measures
to balance the budget.  For this purpose, Council Tax is assumed to remain at
the same levels as 2025-26, with only growth in the Council Tax base reflected.   
General Fund 
4.1.8 As reported in prior years, reduced employer contribution rates payable to
Strathclyde Pension Fund will result in one-off savings in 2024-25 and 2025-26.
It was agreed by Council in February 2024 that £2m of the pension fund gain
would be released each year for a period of 3 years (2024-25 through to 2026-
27), in order to help bridge the budget gap.   
Page 15

Page 16

Funding Summary 
4.1.9  The table below summarises the estimated total funding in the mid-range
scenario over the 5 years 2026-27 to 2030-31. 
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Estimated SG Funding 261,058 260,406 259,755 259,106 258,459
EPR – 2025-26 DEFRA
Funding C/fwd
2,499 0 0 0 0
Released Strathclyde
Pension Fund Gain
2,000 0 0 0 0
Council Tax Base 70,204 70,204 70,204 70,204 70,204
Council Tax Growth 351 704 1,059 1,415 1,773
Total Estimated
Funding
336,112 331,314 331,018 330,725 330,436 
4.2 Base Budget 
4.2.1 The 2025-26 budget approved by Council on 27 February 2025 was
£328.289m.  This included the 2025-26 debt charge implications of approved
borrowing for additional capital investment.  There was also a decision to defer
a policy saving in respect of Community Sports until 2026-27 onwards.  The full
year effect of these previous budget decisions on 2026-27 and future years are
now incorporated as base budget adjustments. 
4.2.2 The revised base budget is outlined in the table below: 
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Base Budget 2025-26 328,289 328,289 328,289 328,289 328,289
Debt Charges Increase 95 95 95 95 95
Approved Policy Savings (20) (20) (20) (20) (20)
Revised Base Budget   328,364 328,364 328,364 328,364 328,364  
4.3 Employee Cost Changes 
Pay Award 
4.3.1  The Public Sector Pay Policy, published alongside the Scottish Budget, sets out
a multi-year framework of a 9% pay envelope covering 2025-26, 2026-27 and
2027-28.  A planning assumption of 3% across each of these years has been
applied in both the best case and mid-range scenarios, with 5% assumed in the
worst case scenario.  For 2028-29 and 2029-30, the best case scenario has
been reduced to 2%, mid-range remains at 3% and worst case remains at 5%.   
4.3.2 The SJC and Chief Officers pay awards for 2025-26 have still to be agreed and
may have an impact on the base budget if the pay award is higher than the 3%
allowed for in the budget. The Teachers pay award now covers the period
August to July and for 2025-26 has already been agreed up to 31 July 2025,
however, any increase beyond that date is still in the negotiation stage.  It is
worth noting that a pay offer has been made to the NHS Agenda for Change
Page 16

Page 17

workforce.  The offer comprises 4.25% for 2025-26 and 3.75% for 2026-27, with
an inflation guarantee, whereby the increase in pay for each year of the deal will
be above the CPI inflation rate. 
Increments 
4.3.3 
4.3.4
There remains a fairly regular turnover of staff within posts and when this
happens, the cost of increments can, in some cases, be absorbed within the
existing budget provision, as leavers who may be at the top their grade may be 
replaced by new starts at the grade entry point. The cost of pay increments for
2025-26 is estimated at £0.599m.   
For future years, an equivalent cost has been assumed in the mid-range and
worst case scenarios, while half the estimated 2025-26 cost has been assumed
in the best case scenario. 
4.3.5
Strathclyde Pension Fund 
As previously reported, the employer contribution rate paid to the Strathclyde
Pension Fund fell from 19.3% to 6.5% in 2024-25 and 2025-26, rising to a
sustainable long term rate of 17.5% from 2026-27. The reduction in the first 2
years equates to reduced costs of £6.875m per annum relating to Council
employees (excluding HSCP). From 2026-27 the costs will rise again to 17.5%
therefore this increase is required to be built into projections from 2026-27
onwards. 
Employee Costs Summary 
4.3.6  The table below summarises the employee cost movements in the mid-range
scenario for council services over the five years 2026-27 to 2030-31.  The future
years estimates have been further refined, following approval of the 2025-26
budget in February 2025.  The employee cost increases relating to Social Work
within the Health and Social Care Partnership are summarised within paragraph
4.6.3. 
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Pay Award 4,752 9,530 14,452 19,521 24,743
Full Year Effect 2025-26
Teachers Pay Award
496 496 496 496 496
Increments 599 1,198 1,797 2,396 2,995
Reinstatement of 
Strathclyde Pension Fund
contribution
6,875 6,875 6,875 6,875 6,875
Total Employee Cost
Changes
12,722 18,099 23,620 29,288 35,109 
4.4 Non-Pay Inflation 
4.4.1  Non-pay inflation is only provided for within budget plans, where it is deemed to
be unavoidable, for example in respect of contractual obligations.  As not all
Page 17

Page 18

4.4.2 
4.4.3 
4.4.4 
4.4.5
budget elements are subject to inflationary increases, inflationary budget
pressures may arise in some other areas and in order to manage spend within
available budget resources, service rationalisation or efficiencies may require to
be delivered. 
Non-pay inflation assumptions within the mid-range scenario are based on
current market forecast data, where available.  Officers continue to review
inflation assumptions on an ongoing basis. However, due to current market
volatility and prevalent levels of uncertainty, at this stage, there has been no
change to the inflationary assumptions included within the 2025-26 Budget
Pack. 
The Budget Outlook provides for unavoidable non-pay inflation within each
budget scenario. In addition, due to prevailing levels of economic uncertainty, it
is deemed prudent to include a further general inflation contingency within the
mid-range and worst case scenarios at £250k and £500k each year
respectively. This contingency will either be required, reduced or removed to
reflect changing circumstances before the 2026-27 budget is set.   
The estimated cumulative inflation over the five years 2026-27 to 2030-31 in the
mid-range scenario is outlined in the table below. 
Non-Pay Inflation
(Unavoidable)
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000 
2,745 5,632 8,676 11,890 15,140 
An analysis of the 2026-27 cost estimate in respect of the mid-range scenario
across key inflationary drivers is given in the table below.  The non-pay
inflationary increases relating to Social Work within the Health and Social Care
Partnership are summarised within paragraph 4.6.3. 
Inflation Category 2026-27
Estimate
£000
Premises and Utilities
(Rates, Electricity, Gas, Oil,
Water)
280
Waste/Landfill Tax 335
NPDO/HUB Schools 382
Other Contracted Services 883
Insurance 414
Other Supplies and Services 201
General Contingency 250
Total 2,745 
4.5 Cost and Demand Pressures 
4.5.1  For a number of years, services have been required to manage any cost and
demand pressures within current budgetary resources, as far as possible. 
However, there are a number of cost and demand pressures, already identified
Page 18

Page 19

4.5.2 
for future years, which cannot be contained without a detrimental impact on
service provision.  These have continued to be reported within previous Budget
Outlook reports and as part of the Revenue Budget Overview report presented
at the Council budget meeting on 27 February 2025.   
Since the budget meeting on 27 February 2025, there have been no changes to
the cost and demand pressures within the mid-range scenario. 
4.5.3  When creating a longer term budget outlook beyond the current year, there is a
greater risk that currently unforeseen or unquantifiable cost and demand
pressures will emerge across future years.  It is therefore deemed prudent to
include a general contingency, proposed at £0.250m within the best case,
£0.500m within the mid-range and £1m within the worst case scenarios year on
year.  This contingency will either be required, reduced or removed to reflect
changing circumstances before the 2026-27 budget is set.   
4.5.4 The cost and demand pressures within the mid-range scenario are detailed in
Appendix 2 and summarised in the table below.  These will be subject to
ongoing review throughout the financial year.   
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
ASN Support 208 422 422 422 422
Election costs 0 350 0 0 0
Education ICT Network
Infrastructure
0 53 53 53 53
Planning (Local
Development Plan)
50 0 0 0 0
Universal Credit – HB
Admin Grant
40 80 120 160 200
Civica Revenue and
Benefits System
0 63 63 63 63
Compliance with BMW Ban 2,479 3,051 3,051 3,051 3,051
Bus Transport Contracts 268 268 268 268 268
Migration from Skype for
Business to Teams
Telephony
63 300 300 300 300
Valuation Joint Board
Requisition
255 301 301 301 301
Allowance for pressures in
future years
500 1,000 1,500 2,000 2,500
Total Cost and Demand
Pressures
3,863 5,888 6,078 6,618 7,158 
4.5.5 The cost and demand pressures relating to Social Work within the Health and
Social Care Partnership are summarised within paragraph 4.6.3. 
4.6 Health and Social Care Partnership 
4.6.1  As part of the 2025-26 budget process, indicative base allocations of £85.045m
were agreed for 2026-27 and 2027-28, with future years’ allocations being
Page 19

Page 20

subject to Scottish Government grant funding and the council’s overall financial
position. The indicative allocation for 2026-27 represents an increase of
£3.053m, reflecting the non-recurring saving in relation to the Strathclyde
Pension Fund contribution. 
4.6.2 Political decisions will require to be made in respect of the allocation to the
Health and Social Care Partnership in future years.  For the purposes of the
Budget Outlook, flat cash allocations, adjusted for the Strathclyde Pension Fund
saving, have been assumed across all scenarios.  These are only indicative
planning assumptions and it will be a matter for Council to consider any
changes, as part of the budget process next year.   
4.6.3 Social Work services have already identified a number of cost and demand
pressures, included within Appendix 3, with the mid-range scenario summarised
below.  These are included for information purposes.  It is expected that the
HSCP will absorb their cost and demand pressures within their funding
allocation.  Note that these only extend to three years rather than the five years
of the council’s Budget Outlook.   
2026-27
£000
2027-28
£000
2028-29
£000
Pay Inflation 1,232 2,501 3,809
Pay Increments 198 396 594
Non-Pay Inflation 771 1,570 2,403
Adult Care - Older People 500 1,000 1,500
Adult Care – Mental Health 50 100 150
Looked After Children 0 250 500
General Contingency 200 400 600
Total Estimated Cost Increases -
Social Work
Cumulative
2,951 6,217 9,556 
4.6.4 
4.6.5 
In addition to the cost and demand pressures outlined above, there will be a
further £3m budget pressure from 2026-27, arising from the non-recurring use of
reserves, as a measure to balance the 2025-26 budget.  This financial outlook is
extremely challenging, particularly given that HSCP reserve balances are
expected to be depleted by 31 March 2026.   
The council’s Section 95 Officer has sought a financial recovery plan from the
IJB, under the terms of the Integration Scheme, seeking assurance in respect of
its current and future financial position.  There is a risk to the council in respect
of failure to manage the delivery of Social Work services within available
resources.  Under the terms of the Integration Scheme, any overspend on
Social Work services, which cannot be met from existing reserve balances, may
fall to be met by the council.  In order to safeguard the financial position of the
council, the financial position of the HSCP and related financial risk to the
council will be closely monitored throughout the year.  This will form part of the
regular reporting to Policy and Resources Committee in respect of the current
year revenue budget monitoring and financial risks, as well as future iterations
of this Budget Outlook report.
Page 20

Page 21

4.7 LiveArgyll 
4.7.1 Political decisions will require to be made in respect of the allocation to
LiveArgyll in future years.  For the purposes of the Budget Outlook, flat cash
allocations have been assumed across all scenarios, with the exception of
previous budget decisions in respect of the Strathclyde Pension Fund
adjustment relating to the cessation of the one-off employer contribution rate
saving (£0.118m increase) and deferral of the 2025-26 proposed saving in the
service fee to 2026-27 (£311k reduction). These are only indicative planning
assumptions and it will be a matter for Council to consider any changes, as part
of the budget process next year.   
4.8 Estimated Budget Gap PRIOR to Measures to Balance the Budget 
4.8.1 The budget gap in the mid-range scenario over the five years 2026-27 to 2030-
31, after allowing for the considerations outlined above and prior to measures to
balance the budget, is outlined in the table below.  This is the budget gap prior
to factoring in any previous savings decisions or potential options towards
balancing the budget.     
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Base Budget 328,289 328,289 328,289 328,289 328,289
Base Budget
Adjustments
75 75 75 75 75
Employee Cost
Changes
12,722 18,099 23,620 29,288 35,109
Non-Pay Inflation 2,745 5,632 8,676 11,890 15,140
Cost and Demand
Pressures
3,863 5,888 6,078 6,618 7,158
Adjustment to HSCP
Payment re SPF Gain
3,053 3,053 3,053 3,053 3,053
Adjustment to
LiveArgyll Payment 
(193) (193) (193) (193) (193)
Total Estimated Net
Expenditure
350,554 360,843 369,598 379,020 388,631
Estimated Funding 336,112 331,314 331,018 330,725 330,436
Estimated Budget
Surplus / (Gap)
Cumulative
(14,442) (29,529) (38,580) (48,295) (58,195) 
4.9  Measures to Balance the Budget 
4.9.1 In 2025-26, a general inflationary increase of 6% was applied to relevant fees
and charges.  For the Budget Outlook, a range of between 3% (worst case) and
9% (best case), with a mid-range of 6% has been assumed each year over the
five years 2026-27 to 2030-31.  As a result of 2025-26 budget decisions taken
by Council on 27 February 2025 to freeze fees on council-run ferries, the
forecast income from fees and charges in future years has been slightly
Page 21

Page 22

reduced.  
4.9.2 Some of the management/operational and policy savings options agreed at the
Council meeting on 27 February 2025 and in previous years will impact the
2026-27 and future years budgets.  These are reflected within the Budget
Outlook over the five years 2026-27 to 2030-31. 
4.9.3  In terms of Council Tax, a 5% increase has been assumed each year in all
scenarios.  All councils increased their Council Tax by at least 6% for 2025-26,
with 13 increasing their Council Tax by more than 10%.  With a focus on longer
term financial sustainability and in light of the significant forecast budget gap
over the next five years, the level of Council Tax increases in 2026-27 and in
future years will require due consideration by Members, as part of the budget
setting for 2026-27 and future years.    
4.9.4  The table below summarises the proposed measures to balance the budget in
the mid-range scenario. 
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Fees and Charges
Increase
382 787 1,217 1,672 2,155
Council Tax Increase  3,528 7,268 11,212 15,372 19,758
Management/Operational
Savings 
(48) (9) (9) (9) (9)
Policy Savings  1,012 1,748 2,217 2,331 2,465
Total Measures to
Balance the Budget
4,874 9,794 14,637 19,366 24,349 
4.10 Estimated Budget Gap AFTER Measures to Balance the Budget 
4.10.1 The table below summarises the estimated budget gap in the mid-range
scenario. 
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Estimated Budget Gap
Prior to Measures to
Balance Budget
(14,442) (29,529) (38,580) (48,295) (58,195)
Measures to Balance
Budget
4,874 9,794 14,637 19,366 24,349
Estimated Budget
Surplus / (Gap)
Cumulative
(9,568) (19,735) (23,943) (28,929) (33,846)
Estimated Budget
Surplus / (Gap) 
In Year
(9,568) (10,167) (4,208) (4,986) (4,917) 
4.10.2 In the mid-range scenario, the budget gap is estimated at £9.568m in 2026-27
and £33.846m over the five year period 2026-27 to 2030-31.   
Page 22

Page 23

4.10.3 The budget gap in the best case scenario is estimated at £6.068m in 2026-27
and £13.415m over five years, increasing to £16.159m in 2026-27 and
£67.384m over five years in the worst case scenario.  A summary of all three
scenarios is included within Appendix 1. 
4.10.4 The changes from the previous Budget Outlook in the mid-range scenario,
reported to Council on 27 February 2025, are summarised in the table below. 
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Previously reported Budget
Surplus / (Gap) 
Cumulative
(9,588) (19,927) (24,316) (29,490)
Adjustment to Council Tax 27 90 158 230
Adjustment to Employee Costs (4) 108 223 342
Adjustment to Fees and Charges (3) (6) (8) (11)
Revised Budget Surplus / (Gap) 
Cumulative
(9,568) (19,735) (23,943) (28,929) 
5. CONCLUSION 
5.1 In the mid-range scenario, the budget gap is estimated at £9.568m in 2026-27
and £33.846m over the five year period 2026-27 to 2030-31.  Council officers
are continuing to explore budget savings options during 2025-26 and these will
be presented to Members in due course.  
5.2  This is a very challenging Budget Outlook position.  Variations to the
assumptions in respect of future Scottish Government grant levels and pay
awards would have a significant impact on the Budget Outlook.  All assumptions
will be kept under review, with the Budget Outlook updated, as and when further
information becomes available.   
6. IMPLICATIONS 
6.1 Policy -  Sets out the Budget Outlook that provides the financial
envelope for policy decisions.
6.2 Financial -  Sets best, worst and mid-range scenarios in respect of
the Budget Outlook.  The council are actively
continuing to pursue opportunities to mitigate against
future budget gaps. 
6.3 Legal -  None directly from this report but the Council requires
to set a balanced budget. 
6.4 HR -  None directly from this report but there is a strong link
between employee numbers and budgets.
6.5 Fairer Scotland Duty - 
6.5.1 Equalities None directly from this report but any proposals to
address the estimated budget gap will require to
consider equality issues.
6.5.2 Socio Economic Duty None directly from this report but any proposals to
Page 23

Page 24

address the estimated budget gap will require to
consider socio economic issues.
6.5.3 Islands Duty None directly from this report but any proposals to
address the estimated budget gap will require to
consider any island specific issues. 
6.6 Climate Change The Council is committed to addressing climate change
and reviews how Services are delivering this on an
ongoing basis, within the available budget resources.
6.7 Risk -  None directly from this report but any proposals to
address the estimated budget gap will require to
consider risk.
6.8 
6.9
Customer Service – 
The Rights of the
Child (UNCRC) -
None directly from this report but any proposals to
address the estimated budget gap will require to
consider customer service. 
None 
Kirsty Flanagan
Executive Director/Section 95 Officer
14 April 2025 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
APPENDICES: 
Appendix 1 – Budget Outlook - Best, Worst and Mid-range Scenarios
Appendix 2 – Cost and Demand Pressures (Council Services)
Appendix 3 – Cost and Demand Pressures (Social Work) 
For further information contact Carolyn Earl, Interim Head of Financial Services
Carolyn.earl@argyll-bute.gov.uk
Page 24

Page 25

BUDGET OUTLOOK 2026-27 to 2030-31 APPENDIX 1
Policy and Resources Committee - 8 May 2025
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Base Budget 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289
Base Budget Adjustments 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75
Revised Base Budget 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364
Pay Award 4,752 9,530 12,811 16,158 19,572 4,752 9,530 14,452 19,521 24,743 7,919 16,041 24,570 33,525 42,928
Full year effect of 2025-26 pay award for teachers in 2026-27 496 496 496 496 496 496 496 496 496 496 496 496 496 496 496
Pay Increments 300 599 899 1,198 1,498 599 1,198 1,797 2,396 2,995 599 1,198 1,797 2,396 2,995
Re-instate Employers Superannuation Rate 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875
Total Employee Cost Changes (Council Services) 12,423 17,500 21,081 24,727 28,441 12,722 18,099 23,620 29,288 35,109 15,889 24,610 33,738 43,292 53,294
Non-Pay Inflation - Council Services 1,771 4,011 6,381 8,893 11,871 2,745 5,632 8,676 11,890 15,140 3,692 7,259 11,012 14,968 18,968
ASN Support 208 422 422 422 422 208 422 422 422 422 208 422 422 422 422
Election Costs 0 327 0 0 0 0 350 0 0 0 0 370 0 0 0
Education ICT Network Infrastructure 0 53 53 53 53 0 53 53 53 53 0 53 53 53 53
Planning (Local Development Plan) 50 0 0 0 0 50 0 0 0 0 50 0 0 0 0
Housing Benefits Admin Grant 40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
Civica Revenue and Benefits System 0 37 37 37 37 0 63 63 63 63 0 137 137 137 137
Compliance with BMW Ban 2,231 2,746 2,746 2,746 2,746 2,479 3,051 3,051 3,051 3,051 2,727 3,356 3,356 3,356 3,356
Bus Transport Contracts 268 268 268 268 268 268 268 268 268 268 268 268 268 268 268
Migration from Skype for Business to Teams Telephony 19 282 282 282 282 63 300 300 300 300 108 318 318 318 318
Valuation Joint Board 255 301 301 301 301 255 301 301 301 301 255 301 301 301 301
Allowance for Cost and Demand Pressures Future Years 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500 1,000 2,000 3,000 4,000 5,000
Total Cost and Demand Pressures 3,321 5,016 4,979 5,269 5,559 3,863 5,888 6,078 6,618 7,158 4,656 7,305 7,975 9,015 10,055
Adjustment to Health and Social Care Partnership Payment 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053
Adjustment to Live Argyll Management Fee (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193)
Total Estimated Expenditure PRIOR to measures to balance the budget 348,739 357,751 363,665 370,113 377,095 350,554 360,843 369,598 379,020 388,631 355,461 370,398 383,949 398,499 413,541
Scottish Government Grant 262,366 263,021 263,678 264,337 264,997 261,058 260,406 259,755 259,106 258,459 259,749 257,801 255868 253,949 252,044
Packing Extended Producer Responsibility Funding - DEFRA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Transfer from Reserves - EPR funding carried forward from 2025-26 2,499 0 0 0 0 2,499 0 0 0 0 2,499 0 0 0 0
Transfer from Reserves - SPF Gain agreed February 2024 2,000 0 0 0 0 2,000 0 0 0 0 2,000 0 0 0 0
Council Tax 70,731 71,261 71,795 72,333 72,875 70,555 70,908 71,263 71,619 71,977 70,380 70,556 70,732 70,909 71,086
Total Funding 337,596 334,282 335,473 336,670 337,872 336,112 331,314 331,018 330,725 330,436 334,628 328,357 326,600 324,858 323,130
Budget Surplus / (Gap) PRIOR to measures to balance the budget (11,143) (23,469) (28,192) (33,443) (39,223) (14,442) (29,529) (38,580) (48,295) (58,195) (20,833) (42,041) (57,349) (73,641) (90,411)
Measures to Balance the Budget:
Fees and Charges 574 1,199 1,880 2,623 3,433 382 787 1,217 1,672 2,155 191 388 591 800 1,015
Council Tax Increase 3,537 7,277 11,231 15,409 19,823 3,528 7,250 11,176 15,316 19,681 3,519 7,223 11,121 15,223 19,538
Council Tax Increase (Growth element) 0 27 55 84 116 0 18 36 56 77 0 9 18 28 38
Policy Savings Agreed Feb 2023 476 1,112 1,581 1,695 1,809 476 1,112 1,581 1,695 1,809 476 1,112 1,581 1,695 1,809
NEW Management/Operational Options 2025 (48) (9) (9) (9) (9) (48) (9) (9) (9) (9) (48) (9) (9) (9) (9)
NEW Policy Options 2025 536 636 636 636 636 536 636 636 636 636 536 636 636 636 636
Total Measures to Balance the Budget 5,075 10,242 15,374 20,438 25,808 4,874 9,794 14,637 19,366 24,349 4,674 9,359 13,938 18,373 23,027
Budget Surplus / (Gap) Cumulative AFTER measures to balance the budget (6,068) (13,227) (12,818) (13,005) (13,415) (9,568) (19,735) (23,943) (28,929) (33,846) (16,159) (32,682) (43,411) (55,268) (67,384)
Budget Surplus / (Gap) In Year AFTER measures to balance the budget 0 (7,160) 410 (188) (410) (9,568) (10,167) (4,208) (4,986) (4,917) (16,159) (16,523) (10,729) (11,857) (12,116)
Mid-Range ScenarioBest Case Scenario Worst Case Scenario
Page 25

Page 26

COUNCIL COST AND DEMAND PRESSURES 2026-27 to 2030-31
Department Service Cost/Demand Pressure 2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Executive Director -
Douglas Hendry
Education The demand for ASN support in Argyll and Bute has continued to grow with a significant increase in, and
early identification of children and young people presenting with complex additional support needs,
including mental health difficulties which manifests often in dysregulated behaviours.  IScottish
Government statistics show that the number of pupils identified with ASN has increased markedly since
2010 and there continue to be year on year increases. These increases are likely due to continue as we see
the impact of the Covid 19 pandemic on children and young people who were born from 2020 onwards
and as we work with partners to streamline assessment processes which help us to understand need
more thoroughly.  Scottish Government statistical datasets show that the percentage of school roll in
mainstream schools of pupils with ASN has increased by approximately 3% year on year.  Within many
authorities, this means increased numbers of children accessing specialist provision. As Argyll and Bute do
not have equitable access to Specialist provision in all areas, the cost pressure associated with offering
appropriate support within our local schools continues to increase in line with need.
208 422 422 422 422 208 422 422 422 422 208 422 422 422 422
Executive Director -
Douglas Hendry
Legal and Regulatory
Services
Estimated cost (to be borne by the Council)  of carrying out local Government elections in May 2027 (and
in financial year 2027/28). Operating approx. 100 polling stations and carrying out poll and count for 11
Multi member wards – requiring 11 separate counts
0 327 0 0 0 0 350 0 0 0 0 370 0 0 0
Executive Director -
Douglas Hendry and
Kirsty Flanagan
Education and ICT The Education ICT Network requires  a transformative technology upgrade in 2025-26 with improved
security and reconfiguration to support in-school and at home learning.  A cost pressure was agreed as
part of the budget for 2025-26.  There was an ongoing revenue requirement built into the cost pressure
and this is expected to increase from 2027-28.  
0 53 53 53 53 0 53 53 53 53 0 53 53 53 53
Executive Director -
Kirsty Flanagan
Development &
Economic Growth
Local development plan will require to be done under the new Planning legislation which is a revised
process from the current one and will have a 10 year life. The new process has 2 stages where there is
likely to be a cost pressure - a gate check followed by an examination some time later.
50 0 0 0 0 50 0 0 0 0 50 0 0 0 0
Executive Director -
Kirsty Flanagan
Financial Services Universal Credit “Full” Service went live in Sept 2018, managed migration for working age claimants
began in August 2023 and will be completed by December 2025. Details of the migration of Pension age
Housing Benefit claimants have not yet been released initial indications was that the overall migration to
Pension Credit will be completed in 2028/2029 although that looks unlikely now. The DWP will reduce the
Housing Benefit Administration Subsidy they pay to the Council as some claimants come off of Housing
Benefit processed by Council staff and go onto Universal Credit processed by the DWP.  The Council’s
caseload has reduced since implementation of Universal Credit but it is hard to predict just how quickly
the rest of the caseload will migrate from Housing Benefit to Universal Credit between now and
2028/2029.  These figures represent our best estimates at this time.
40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
Executive Director -
Kirsty Flanagan
Financial Services The Council has been engaged in discussions with the supplier of the Revenues and Benefits Management
System and also the Electronic Document Management System.  We expect cost increases in the future as
the supplier moves the systems to the Cloud.  The cost presure is an estimate at this time and will be
refined as we get nearer to 2027-28.
0 37 37 37 37 0 63 63 63 63 0 137 137 137 137
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
Achieving compliance with ban on biodegradable municipal waste (BMW) which comes into place on 1
January 2026.  The costs are the best estimates at this stage and consultants have assisted in producing
the estimates.  The best case and worst case scenarios are based on the mid-range with a +/- 10% change
2,231 2,746 2,746 2,746 2,746 2,479 3,051 3,051 3,051 3,051 2,727 3,356 3,356 3,356 3,356
Roads & Infrastructure
Services
Bus Transport contracts have seen a siginificant increase in new contract prices due to increased costs for
fuel, insurance, maintenance, regualtory compliance and driver wages.  New contracts have seen a
combined annual increase of £975k across Argyll and Bute during 2024-25 with further contract renewals
due in 2025-26.   The cost pressure is the best estimate of future renewals and expected increases.  An
options appraisal is currently being carried out to assess the best and most cost effective solution for
future delivery of the school and public transport service.
268 268 268 268 268 268 268 268 268 268 268 268 268 268 268
Executive Director -
Kirsty Flanagan
ICT Migration from Skype for Business to Teams Telephony to ensure those staff who need to make and
receive external calls can do so. This was agreed at Policy & Resources Committee on 15 August.
19 282 282 282 282 63 300 300 300 300 108 318 318 318 318
Council Wide Council Wide A letter from the Dunbartonshire and Argyll and Bute Valuation Joint Board was received on 30 January
2025 advising of the financial challenges facing the Board and the estimated 2025-26 to 2027-28 budget
gaps along with a request to increase the level of contribution that we make to the Board.  Since 2012-13
the core constituent funding to the Board has either reduced or been flast cash for the past 7 years with
the Board heavily reliant on reserves.  As the reserves will be fully depleted by 2025-26 there is a required
for the requisitions to increase.
255 301 301 301 301 255 301 301 301 301 255 301 301 301 301
Council Wide Council Wide General provision for unidentified Cost and Demand Pressures 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500 1,000 2,000 3,000 4,000 5,000
TOTAL 3,321 5,016 4,979 5,269 5,559 3,863 5,888 6,078 6,618 7,158 4,656 7,305 7,975 9,015 10,055
Best Case Mid-Range Worst Case
APPENDIX 2
Page 26

Page 27

SOCIAL WORK COST AND DEMAND PRESSURES - 2026-27 to 2028-29 APPENDIX 3
Service Cost/Demand Pressure 2026-27
£000
2027-28
£000
2028-29
£000
2026-27
£000
2027-28
£000
2028-29
£000
2026-27
£000
2027-28
£000
2028-29
£000
All Social Work Estimated Pay inflation reflecting a best case at 3% up to 2027/28
reflecting the Scottish Government Public Sector Pay Policy before
reducing to 2% in 2028/29, a mid-range of 3%  and a worst case of 5%.
Adjusted for the impact of the increase in the employer's pension
contribution rate from 6.5% to 17.5% in 2026/27.
1,232 2,501 3,373 1,232 2,501 3,809 2,054 4,210 6,474
All Social Work Estimated Pay increments, best case is that 50% of the incremental
changes based on 2025/26 are absorbed and in the mid-range and worst
case, the increase is in line with the increase in 2025/26.
99 198 297 198 396 594 198 396 594
All Social Work Inescapable non-pay inflation across a range of activities and activity
specific inflation rates with a 0.5% tolerance for the best and worst cases.
541 1,102 1,680 681 1,388 2,126 817 1,675 2,577
All Social Work Non-pay inflation impact of payroll inflation on NHS posts which are
recharged to Social Work.
75 151 230 90 182 277 104 213 325
Adult Care Older People Demand Growth: The number of older people is increasing
and older people are living longer with significant health and support
needs and significant expectations of the support they are entitled to
receive. Best case assumes that this will be offset by efficiency
improvement and increasing unmet need / demand. The mid range allows
for a 1.5% increase each year. Worst case is 3% per year on the older
adult services budget.
0 0 0 500 1,000 1,500 1,000 2,000 3,000
Adult Care Mental Health Demand Growth - As above, services operating within
budget overall. The best case assumes a 0% increase in spending
reflecting the limited service capacity in the area, the mid-range reflects
2% growth in 26/27 and 27/28 and the worst case reflects 3% growth.
0 0 0 50 100 150 75 150 225
Children and
Families
Looked After Children Demand Growth - there is a continuing demand for
placements of children who are cared for by the HSCP. The best case
scenario is that the expected additional demand can be funded from
within existing resources as a result of planned improvements to the
service delivery model (eg shift away from high cost external residential
care to local foster and kinship care), the mid case reflects that additional
demand in 26/27 be funded from existing resource with £250k per annum
thereafter and the worst case reflects £250k per annum.
0 0 0 0 250 500 250 500 750
All Social Work Allowance for unknown cost and demand pressures which could arise. Per
James Gow this is to reduce to £200k pa
0 0 0 200 400 600 200 400 600
TOTAL UNFUNDED COST AND DEMAND PRESSURES 1,947 3,952 5,580 2,951 6,217 9,556 4,698 9,544 14,545
Worst CaseMid RangeBest Case
Page 27

Page 28

This page is intentionally left blank

Page 29

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 8 MAY 2025
HEALTH AND SOCIAL CARE PARTNERSHIP – FINANCIAL POSITION  
1. EXECUTIVE SUMMARY 
1.1 This report brings to the attention of Members, the current financial position of
the Health and Social Care Partnership (HSCP) and the request for a recovery
plan to be developed. 
1.2 The Integrated Joint Board approved the HSCP budget for 2025-26 at their
meeting on 26 March 2025.  Social Work had a balance of £0.500m of savings
still to be identified and Health had a gap of £4.2m as the HSCP were not able
to identify the required 3% in NHS savings.   
1.3 The gap in 2025-26 and opening gap in 2026-27 need to be addressed
urgently and it is the intention of the HSCP that there is some overlap between
short term recovery actions and the slightly longer-term requirement to reduce
costs substantially. 
1.4 The IJB Chief Officer and Chief Financial Officer are currently preparing a
recovery plan which will be presented to the IJB at the end of May.  Once the
recovery plan has been approved by the IJB, it will then be submitted to the
Council. 
1.5 Should the recovery plan not be successful the Council may be faced with
having to make interim funds available which would most likely have to come
from the Council’s General Fund.   
1.6 The HSCP position will be closely monitored during the year and updates
provided to the Policy and Resources Committee via the regular budget
monitoring pack. 
1.7 It is recommended that the Policy and Resources Committee: 
a) Consider the content of this report.
b) Note that a recovery plan is currently being prepared and will be
presented to Council once it has been approved by the IJB. 
c) Note that a risk remains that the HSCP may revert to the Council for
interim funds. 
Page 29 Agenda Item 5

Page 30

ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE
FINANCIAL SERVICES 8 MAY 2025
HEALTH AND SOCIAL CARE PARTNERSHIP – FINANCIAL POSITION  
2. INTRODUCTION 
2.1 This report brings to the attention of Members, the current financial position of
the Health and Social Care Partnership (HSCP) and the request for a recovery
plan to be developed. 
3.  RECOMMENDATIONS 
3.1  It is recommended that the Policy and Resources Committee: 
a) Consider the content of this report.
b) Note that a recovery plan is currently being prepared and will be
presented to Council once it has been approved by the IJB. 
c) Note that a risk remains that the HSCP may revert to the Council for
interim funds. 
4. DETAIL 
4.1  The Health and Social Care sector across Scotland is in a difficult position at
present due to the financial challenges they are facing.  Most HSCPs have
significant forecast deficits and depleted reserves.  Audit Scotland have
repeatedly reported that the sector is not operating on a financially sustainable
basis.  As reserves are reduced, service reduction is now required.  The drivers
of the financial challenges are: 
• Real terms reductions in funding over several years.
• Increasing demand for services due to the ageing demographic. 
• On-going shortages of staff resulting in increased dependency upon
agency staffing.   
4.2  The Integrated Joint Board approved the HSCP budget for 2025-26 at their
meeting on 26 March 2025.  Social Work had a balance of £0.500m of savings
still to be identified and Health had a gap of £4.2m as the HSCP were not able
to identify the required 3% in NHS savings.   
4.3 The £0.500m of unidentified savings in Social Work is in addition to £1.547m of
identified savings planned for 2025-26.  There remains a risk that the gap could
increase if the agreed savings are not delivered or if costs and demand
increases.  One key risk relates to the increase in the employer National
Insurance rate from 1 April 2025.  Scottish Government provided 60% of the
funding for employees directly employed by the Council, with the Council
providing the remaining 40% of funding.  The risk is in respect of commissioned
Page 30

Page 31

providers and the HSCP estimate this could be in the region of £1.3m-£1.4m
and strong representation has been made to the Scottish Government.   
4.4 There is a larger funding gap from 2026-27 onwards due to almost £3m of non-
recurring funding being used towards the 2025-26 budget.  At the time of writing
this report, the outturn for 2024-25 has not been finalised.   
4.5 The gap in 2025-26 and opening gap in 2026-27 needs to be addressed
urgently and it is the intention of the HSCP that there is some overlap between
short term recovery actions and the slightly longer-term requirement to reduce
costs substantially. 
4.6 I am bringing the HSCP financial position to the attention of this Committee as
the Scheme of Integration states 
“Any potential deviation from the planned outturn should be reported to the IJB,
the Council and NHS Highland at the earliest opportunity”.   
The Scheme also states 
“Where it is forecast that an overspend will arise, then the Chief Officer and
Chief Financial Officer of the IJB will identify the cause of the forecast
overspend and prepare a recovery plan setting out how they propose to address
the forecast overspend and return to a breakeven position. The Chief Officer
and Chief Financial Officer of the IJB should consult the Section 95 Officer of
the Council and the Director of Finance of NHS Highland in preparing the
recovery plan. The recovery plan should be approved by the IJB. The report
setting out the explanation of the forecast overspend and the recovery plan
should also be submitted to the Council and NHS Highland.” 
4.7 I have been liaising with the IJB Chief Officer and Chief Financial Officer and
they are currently preparing a recovery plan which will be presented to the IJB
at the end of May.  Once the recovery plan has been approved by the IJB, it will
be submitted to the Council. 
4.8 Further savings cannot be delivered without reduction in service and capacity
within the HSCP. Almost all social care services are provided to individuals with
protected characteristics (children, older people, people with disability) and it is
therefore not possible to reduce services without having a disproportionate
adverse impact on these groups.  The draft recovery plan includes increases to
income, vacancy savings, review of services, application of a care ceiling and
agency staff savings.  These have still to be discussed and approved by the IJB. 
4.9  The IJB Finance and Policy Committee have requested that the HSCP
management team outline potential actions that could be expected to reduce
spend at a pace and magnitude to address the future budget gap.  Options are
currently being explored, and it is welcomed that the Council has set aside
£0.500m to assist with transformation and it is likely that this will be used to
bring in external consultancy to provide challenge and identify opportunities for
cost savings.  Information will be provided to the Council as and when required.   
4.10 As noted above, there remains a risk that the HSCP cannot bring its 2025-26
Page 31

Page 32

expenditure within budget.  The Scheme of Integration states 
“Where recovery plans are unsuccessful and an overspend occurs at the
financial year end, and there are insufficient reserves to meet the overspend,
the Parties will consider making interim funds available.  An analysis will be
undertaken to determine the extent to which the overspends relate to either
budgets delegated back to or activities managed by the Council or NHS
Highland with the allocation of the interim funds being based on the outcome of
this analysis. Any interim funds provided by the Council or NHS Highland will be
repaid in future years based on a revised recovery plan agreed by both parent
bodies, as required by either of the Parties. The NHS and Council will require to
be satisfied that the recovery plan provides reasonable assurance that financial
balance will be achieved.” 
4.11  The risk to the Council is in respect of any Social Work overspend within the
HSCP.  The Council may be faced within having to make interim funds available
which would most likely have to come from the Council’s General Fund.  As
reported to the Council in February, the unallocated General Fund balance is
estimated to be less then £1m, although is subject to change as we finalise the
2024-25 year-end position.   
4.12 The HSCP position will be closely monitored during the year and updates
provided to the Policy and Resources Committee via the regular budget
monitoring pack. 
5. CONCLUSION 
5.1 The HSCP is facing an extremely challenging financial position.  The Integrated
Joint Board approved the HSCP budget for 2025-26 at their meeting on 26
March 2025.  Social Work had a balance of £0.500m of savings still to be
identified and Health had a gap of £4.2m as the HSCP were not able to identify
the required 3% in NHS savings.   
5.2  The IJB Chief Officer and Chief Financial Officer are currently preparing a
recovery plan which will be presented to the IJB at the end of May.  Once the
recovery plan has been approved by the IJB, it will then be submitted to the
Council.  Should the recovery plan not be successful the Council may be faced
with having to make interim funds available which would most likely have to
come from the Council’s General Fund.   
5.3  The HSCP position will be closely monitored during the year and updates
provided to the Policy and Resources Committee via the regular budget
monitoring pack. 
6. IMPLICATIONS 
6.1 Policy -  The Scheme of Integration sets out the financial
arrangements for the IJB and partner bodies. 
6.2 Financial -  The HSCP are working on preparing a recovery plan
for 2025-26 as there is £0.500m of unidentified savings
in Social Work and a gap on £4.2m within Health. 
Page 32

Page 33

6.3 Legal -  None directly from this report, when thee recovery plan
is prepared it may have Legal issues to consider. 
6.4 HR -  None directly from this report, when the recovery plan
is prepared it may have HR issues to consider. 
6.5 Fairer Scotland Duty - 
6.5.1 Equalities None directly from this report, when the recovery plan
is prepared, it will require to consider equality issues.
6.5.2 Socio Economic Duty None directly from this report, when the recovery plan
is prepared, it will require to consider equality issues.
6.5.3 Islands Duty None directly from this report, when the recovery plan
is prepared, it will require to consider equality issues.
6.6 Climate Change The Council and HSCP is committed to addressing
climate change and reviews how Services are
delivering this on an ongoing basis, within the available
budget resources.
6.7 Risk -  There is a risk that the HSCP will revert to the Council
for an interim fund payment if there is an overspend at
the year end.  
6.8 
6.9
Customer Service – 
The Rights of the
Child (UNCRC) -
None directly from this report, when the recovery plan
is prepared, it will require to consider customer service. 
None 
Kirsty Flanagan
Executive Director/Section 95 Officer
16 April 2025 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services
Councillor Dougie McFadzean, Policy Lead for Care Services 
Page 33

Page 34

This page is intentionally left blank

Page 35

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE 
FINANCIAL SERVICES  8 MAY 2025 
EMPTY PROPERTY RELIEF FOR BUSINESSES – POLICY UPDATE 
1.0  EXECUTIVE SUMMARY 
1.1 From 1 April 2023, the administration of Empty Property Relief (EPR) in Non-
Domestic Rates (NDR) was devolved to Scottish local authorities. Argyll and
Bute Council receives £608,000 annually for three years to manage EPR
locally. 
1.2 While new policy changes in 2024/25 reduced the Council’s EPR expenditure
significantly, the number of empty business properties has continued to rise,
reaching 332 by February 2025. 
1.3 To address challenges and better support economic regeneration, this report
recommends two policy amendments: 
• Introduction of a targeted discretionary extension of up to 12 months of
100% EPR for owners actively renovating empty properties to bring
them back into use.
• Restriction of EPR eligibility for large businesses with cumulative
rateable property values exceeding £1 million. 
1.4 These amendments are designed to make best use of devolved EPR
funding by encouraging property reuse, supporting local business owners,
and ensuring relief is not disproportionately allocated to large corporations. 
Page 35 Agenda Item 6

Page 36

ARGYLL AND BUTE COUNCIL  POLICY AND RESOURCES COMMITTEE 
FINANCIAL SERVICES  8 MAY 2025 
EMPTY PROPERTY RELIEF FOR BUSINESSES – POLICY UPDATE 
2.0 INTRODUCTION 
2.1 Following devolved powers granted by the Scottish Government from 1 April
2023, Argyll and Bute Council assumed control over the administration of
EPR, with a dedicated budget of £608,000 per annum for three years. 
2.2 In 2023/24, the Council operated EPR under the legacy Scottish Government
rules and incurred £758,000 in costs across 316 properties, resulting in an
overspend in the year.   
2.3 To improve sustainability, a revised EPR policy was introduced in 2024/25
which reduces relief over time, encouraging reoccupation of properties. 
2.4 Despite lowering projected EPR spend to £254,000 in 2024/25 and an
anticipated £62,000 in 2025/26, the number of empty properties increased to
332. This report proposes two strategic amendments to enhance the impact of
the EPR policy and provide more targeted business support. 
3.0 RECOMMENDATIONS 
3.1 Policy and Resources Committee is requested to approve the following policy
amendments; 
i) Introduction of a discretionary 100% EPR extension of up to 12 months.
Officers will have the discretion to apply an additional one-year (or lesser
period) of 100% relief for property owners with genuine, evidenced
renovation projects. Eligibility will be based on clear criteria and subject to
regular review.
ii) Restriction of EPR eligibility for large multinational businesses. A threshold
will be introduced where businesses with empty properties exceeding a
cumulative rateable value of £1,000,000 are ineligible for EPR. 
3.2 Policy and Resources Committee is further requested to approve that both
policy amendments be implemented with immediate effect. 
4.0 DETAIL 
Proposed Policy Amendment 1: Enhanced Support for Renovation Projects 
4.1 Under current policy, empty properties receive:
• 50% relief for 3 months, 
Page 36

Page 37

• 10% for 9 months, 
• 0% thereafter. 
4.2 The proposed amendment introduces flexibility for property owners actively
working to bring properties back into use. Specifically, owners can apply for
up to 12 months of 100% relief at any time after the property becomes vacant,
provided:
• Planning and building consents are secured;
• A detailed renovation schedule is submitted;
• Photographic evidence confirms works have commenced;
• The Council’s Empty Business Property Officer is granted access for
inspections. 
4.3 Applications can be made at any time, whether during the initial relief period
or once the property has already moved into full liability and no relief applies.
If approved, the enhanced relief is awarded for a maximum of 12 months.
There are no further extensions. 
4.4 Relief may be awarded on a phased basis (e.g., 3, 6, or 9 months), with
officers conducting regular 3-month reviews to confirm progress. Should
progress stall, officers retain the discretion to withdraw relief. 
4.5 This approach ensures that support is targeted at owners making active,
genuine efforts, prevents misuse of relief, and maintains a clear incentive to
complete renovation works promptly. 
Example of Proposed Policy Amendment 1 
4.6 A former hotel in Argyll and Bute, vacant since 2010 and with listed building
status, has secured full planning and building consents. Under the current
scheme, the owner faces NDR charges of £6,800 in 2024/25 and £8,500 in
2025/26. 
4.7 With the proposed amendment, the owner could apply for enhanced relief
once works commence (for example, from 1 June 2025). If approved, they
would receive 100% relief for up to 12 months, enabling circa £8,500 of
funding to be redirected to completing renovations, bringing a key community
asset back into use. 
4.8 If the works are not completed by the end of the enhanced relief period (for
example, by 31 May 2026), the relief will cease, and full Non-Domestic Rates
(NDR) liability will apply. This approach provides the property owner with a
clear and fixed timeline for completion, offering both an incentive to finalise
works within the agreed period and the reassurance of avoiding NDR charges
during the costly renovation phase. 
Page 37

Page 38

4.9 It also creates a clear framework for the Empty Property Officer to reinforce at
each of their scheduled three-monthly inspections, ensuring that owners
remain focused on completion milestones throughout the duration of the relief
period. 
Relief Flow Table: Current and Proposed Relief 
Stage Current Relief
Policy
Proposed Enhanced Discretionary Relief
Policy (For Eligible Renovation Projects) 
Conditions of Award
(Consents secured, works commenced) 
Not Met  Met
Date
property
becomes
empty
0-3 months
50% relief 
Current policy
applies (all stages) 
100% Empty Property
Relief available for a
maximum of 12 months
(commencing date
conditions met) during
24 month period
4–12
months 10% relief
12-24
months
0% relief
ongoing
Post-24
months Not applicable 0% relief ongoing 
Note: Enhanced relief is available flexibly, aligned with project readiness rather than
fixed time periods. 
Proposed Policy Amendment 2: Restriction of EPR eligibility for very large
businesses. 
4.10 A small number of large multinational businesses own-high value business
properties in Argyll and Bute. If these become vacant and the owners claim
EPR a large portion of available funds could be consumed. 
4.11 Under the current policy the large multinational businesses would be eligible
for EPR diverting much needed funds away from smaller local businesses. 
4.12 The proposed amendment introduces a £1,000,000 cumulative rateable value
threshold for EPR eligibility. 
Page 38

Page 39

Example of Proposed Policy Amendment 2 
4.13 A multinational with properties that have a combined rateable value of £2.5
million operations. If granted EPR as part of the current policy they could
receive £286,500 in relief, 48% of the Council’s total EPR fund. Excluding
such cases prioritises support for local regeneration.   
Property Analysis and Trends 
4.14 The table below shows the trends in EPR by category since the new policy
has been introduced; 
4.15 Recent analysis shows an increase in properties receiving both Listed
Building and Standard EPR:
• Standard category: up by 40 (from 229 to 269);
• Listed category: up by 13 (from 25 to 38). 
4.16 Notably, properties with a rateable value under £1,700 have declined from 63
to 25, indicating success in discouraging prolonged vacancy in lower-value
properties. 
4.17 While the overall number of EPR recipients has increased, total value of relief
awarded has fallen significantly:
• From £758,362 in August 2023
• To £253,747 in March 2025 
Aug-23 Mar-25 Difference Aug-23 Mar-25 Difference
Listed Building 100% 0% 46 73 27 330,884 72,738 258,146
Insolvency 100% 0% 2 5 3 285,300 95,859 189,441
Rateable Value
Less Than £1700 100% 0% 155 90 -65 56,470 6,315 50,155
Standard Empty
Property Relief
50% for 3
months
10%
thereafter
50% for 3
months 90%
thereafter
103 148 45 48,865 69,394 -20,529
Ratepayer
Deceased 100% 0% 6 6 0 17,172 3,514 13,658
Ground – On
Valuation Roll 100% 0% 4 6 2 15,886 3,290 12,596
Occupation
Prohibited By
Law
100% 0% 1 2 1 3,785 1,730 2,055
Industrial
Property
100% for
6 months
10%
thereafter
0% for 6
months 90%
thereafter
0 2 2 0 906 -906
TOTAL 317 332 15 758,362 253,747 504,615
Type of Empty
Property Relief
EPR
Relief EPR Charge No of Subjects Total Value of EPR                                          
(£)
Page 39

Page 40

4.18 The appointment of the Empty Business Property Officer in December 2024
has supported this progress, enhancing engagement with property owners
and setting up a structured Business Grant Scheme. 
4.19 Some figures are skewed by a single ratepayer in Campbeltown owning 19
empty storage units, and there has been a rise in Standard EPR recipients,
particularly among shops and offices — concerning due to their importance to
local economies. These properties are being prioritised within the grant
scheme. 
5.0  CONCLUSION 
5.1 While the current policy has reduced overall expenditure, the number of
empty properties has increased. Targeted, evidence-based support is
required to encourage reoccupation and regeneration. 
5.2  Approval of the proposed amendments will:
• Align EPR with economic regeneration goals;
• Encourage timely reoccupation of vacant properties;
• Protect public funds from disproportionate claims by large businesses. 
5.3 Combined with the structured business grant scheme, these changes provide
a robust platform for revitalising communities across Argyll and Bute
.
6.0 IMPLICATIONS 
6.1 Policy - The proposed amendments represent a refinement of the Council’s
current EPR policy, providing additional flexibility to support economic
regeneration while continuing to encourage the reuse of empty properties.
Approval will enable more targeted use of EPR funding aligned with Council
priorities. 
6.2 Financial - The changes will help manage EPR expenditure within the
allocated £608,000 annual budget by:
• Reducing potential high-value claims from large multinational property
owners.
• Allowing freed-up funds to be redirected toward structured business
support grants.
• Supporting long-term financial sustainability of the EPR scheme.
Any minor system adjustment costs are expected to be absorbed within
existing budgets. 
6.3  Legal - The Council has discretion under devolved powers to apply and
amend EPR policy locally. 
6.4  HR - There are no additional HR implications. The existing Empty Business
Property Officer will continue to deliver and monitor the amended policy within
current resources and be supported by the NDR team in doing so.
Page 40

Page 41

6.5  Fairer Scotland Duty:
6.5.1   Equalities - There are no direct equalities impacts. The
discretionary relief process will be applied fairly and consistently, with
appropriate checks and balances in place. 
6.5.2   Socio-economic Duty - The amendments are expected to
positively impact socio-economic inequality by:
• Supporting local business owners and communities to bring
vacant premises back into use.
• Prioritising funding to projects that support economic
regeneration in fragile town centres. 
6.5.3 Islands - The amendments will be applied across Argyll and
Bute, including island communities. The discretionary nature of the
support allows for local context and barriers to be considered and
allows tailored support for island based projects. 
6.6 Climate Change - By supporting the reuse and renovation of existing
buildings, the policy encourages sustainable development and may help
reduce the need for new-build developments. 
6.7 Risk - Key risks include:
• Misuse of discretionary relief if not effectively monitored.
• Potential negative feedback from large multinational businesses no longer
eligible for EPR.
• Mitigations include clear eligibility criteria, ongoing monitoring by officers,
and transparency in decision-making. 
6.8  Customer Service - The amendments improve the Council’s responsiveness
to property owners who are committed to bringing buildings back into use.
Streamlined application processes and officer engagement will support better
outcomes for customers. 
6.9 The Rights of the Child (UNCRC) - There are no direct implications under the
UNCRC. However, returning vacant properties to use may contribute
indirectly to stronger local economies and community resilience, benefiting
families and children. 
Kirsty Flanagan, Executive Director with responsibility for Finance
Policy Lead Councillor Ross Moreland
27 March 2025                                                  
For further details or discussion, please contact;
Fergus Walker, Revenues and Benefits Manager, Financial Services.
Fergus.walker@argyll-bute.gov.uk 
Fergus Murray, Head of Development and Economic Growth
Fergus.murray@argyll-bute.gov.uk 
Page 41

Page 42

This page is intentionally left blank

Page 43

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE 
CUSTOMER SUPPORT SERVICES                                                   8 MAY 2025 
CORPORATE PLAN 2025 - 2027 
1.0 INTRODUCTION 
1.1 This report introduces the new Corporate Plan 2025 – 2027 which the Policy
and Resources Committee is asked to consider and approve for onward
transmission to Council. 
2.0 RECOMMENDATIONS 
2.1 The Policy and Resources Committee is asked to approve the new Corporate
Plan, which contains the new Council Priorities, for onward transmission to the
Council. 
3.0 DETAIL 
3.1  Members agreed revised strategic priorities at the Council meeting in
September 2024.  Those priorities replace the ones outlined in the previous
Corporate Plan for 2023 – 2027 and can be found on the Council website here
Priorities of Argyll and Bute Council | Argyll and Bute Council. 
3.2  An updated Corporate Plan has now been developed to cover the remainder
of the Council term to 2027 and includes these new priorities.   
3.4  In the recently published Best Value Audit of the Council, the Accounts
Commission recognised that since the change in Administration in 2024, they
recognise that the Council now has many critical pieces of work in the
pipeline.  One of those is identified as the new Corporate Plan.  This new Plan
seeks to set the strategic direction for the Council, which will allow the Council
to ensure financial sustainability as well as meeting the needs of service users
across Argyll and Bute. 
3.5 The new Plan maintains a clarity of vision, keeping the focus on the long term,
sustainable future of the area in terms of population and economy. Population
continues to be a challenge for our area, as we can see from the projected
long-term decline. But it is important to remind ourselves that in 2012, the
NRS projected that by 2022 our population would drop to 82,753. This did not
happen, and our actual census position in 2022 was 87,810. Maintaining our
Page 43 Agenda Item 7

Page 44

focus is essential to turning this projected trend around and provides clarity for
the alignment by all supporting strategies and policies. 
3.6 The new Corporate Plan will be underpinned by more streamlined and
focused performance reporting and the development of Key Performance
Indicators to drive continuous improvement. Members will be aware of the
ongoing Performance Excellence project, reported on regularly to the Audit
and Scrutiny Committee, which sets the direction for delivering on this action. 
4.0 CONCLUSION 
4.1  A new Corporate Plan is now presented to the Policy and Resources
Committee Council incorporating priorities agreed in September 2024 for
approval. This sets the overall strategic framework for Council activities and is
part of our overall Corporate Planning, Performance and Improvement
Framework.  It is a critical piece of work identified by the Accounts
Commission and maintains clarity of vision for the long term future of council
services for our communities. 
5.0 IMPLICATIONS 
5.1 Policy:  The Corporate Plan sets out the strategic policy
framework for the Council. 
5.2 Financial:  The Corporate Plan sets out the priorities and strategic
direction of the Council which is important for ensuring
financial stability. 
5.3  Legal:   The Corporate Plan is a critical document in ensuring
that the Council delivers on its statutory duty of Best
Value. 
5.4  HR:    None arising directly from this report.  
5.5  Fairer Scotland Duty: An Integrated Impact Assessment for the Corporate
Plan will be available on the Council website. 
5.5.1     Equalities - protected characteristics: none arising
directly from this report. 
5.5.2     Socio-economic Duty: none arising directly from this
report. 
5.5.3    Islands: none arising directly from this report. 
5.6 Climate Change: None arising directly from this report.  
5.7 Risk:  The new Corporate Plan mitigated the risk of failure to
deliver on the agreed priorities of the Council. 
Page 44

Page 45

5.8  Customer Service: None arising directly from this report. 
5.9 The Rights of the  None arising directly from this report. 
Child (UNCRC): 
Pippa Milne, Chief Executive 
Council Leader, Jim Lynch 
April 2025                                                  
For further information contact: 
Jane Fowler, Head of Customer Support Service, jane.fowler@argyll-bute.gov.uk
Carolyn Cairns, HROD Manager carolyn.cairns@argyll-bute.gov.uk 
Appendices 
Appendix 1: Corporate Plan 2025 – 2027 
Page 45

Page 46

This page is intentionally left blank

Page 47

Classification: OFFICIAL  
#abpla
ce2b
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead •
Seil …
Corporate Plan
2025 - 2027 
Page 47

Page 48

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
2
Classification: OFFICIAL
Contents 
1. WELCOME ........................................................................................... 3
2. OUR PROFILE ...................................................................................... 4
3. OUR STRATEGIC FRAMEWORK ........................................................ 5
4. OUR VISION ......................................................................................... 6
5. OUR PRIORITIES ................................................................................. 7
PRIORITY: COMMUNITIES .................................................................. 9
PRIORITY: CHILDREN AND YOUNG PEOPLE .................................. 10
PRIORITY: HOUSING, ECONOMIC GROWTH
AND POPULATION .......................................................... 11
PRIORITY: TRANSPORT, INFRASTRUCTURE
AND DIGITAL CONNECTIVITY ........................................ 14
PRIORITY: ENVIRONMENT ............................................................... 16
PRIORITY: SUSTAINABLE SERVICE DELIVERY .............................. 16
PRIORITY: SPEAKING UP FOR ARGYLL AND BUTE ........................ 18
6. OUR CHALLENGES AND RISKS ...................................................... 19
7. OUR SUCCESS MEASURES ............................................................. 21 
Page 48

Page 49

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
3
Classification: OFFICIAL
1. Welcome 
We are delighted to introduce our Corporate Plan, which outlines our vision and 
strategic direction for the coming years. The landscape in which we deliver our 
services is constantly evolving and we will adapt and innovate to meet the needs of 
our communities and ensure the prosperity of our area. The considerable challenges 
we identified in our previous corporate plan remain unchanged; declining funding,
economic dependence on the public sector, and an ageing population are ever 
present however we remain steadfast in our mission.  
Our Corporate Plan focuses on key priorities for the next three years, with detailed
actions and progress measures outlined in our Annual Business Plan. As we embark 
on this transformative journey, it is crucial that we remain adaptable and responsive 
to the evolving needs and challenges of our time. Our corporate plan serves as a
compass, guiding our decision-making processes and ensuring that our efforts are
aligned with our strategic objectives, with our communities at its heart.  
This plan details our commitment to attracting and retaining talented individuals,
fostering a positive employee experience, and cultivating a culture of unity and
innovation within our council. Our aim is to build a thriving, inclusive, and forward-
thinking environment that benefits everyone. Our success is built on collaboration 
and community engagement, forging strong partnerships and actively involving 
local communities is key to our success. We value the diverse perspectives and
expertise within our community, and through meaningful dialogue and cooperation, 
we can build a brighter future together.  
We are committed to delivering high-quality services, enhancing infrastructure, 
and nurturing a vibrant economy that creates opportunities for all. 
Councillor Jim Lynch
Leader of Argyll and Bute
Council
Pippa Milne
Chief Executive
Page 49

Page 50

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
4
Classification: OFFICIAL
2. Our Profile 
Page 50

Page 51

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
5
Classification: OFFICIAL
3. Our Strategic
Framework
This plan sets the strategic direction for the council, highlighting our key corporate
priorities and deliverables for the period until 2027. Our Corporate plan is part of a
portfolio of documents that make up our planning framework at corporate level and 
is the overarching document for our wider Performance and Improvement framework. 
Our corporate plan shows how our corporate priorities will contribute to the overall
shared vision for our area agreed with our community planning partners, in the Argyll
and Bute Outcome Improvement plan 2024-2034 (ABOIP). 
In addition to our corporate priorities the Council has several strategic objectives,
statutory duties and responsibilities. Together, these all ensure that we have financial
sustainability and meet the needs of service users across Argyll and Bute. Our annual
business plan is where we set out deliverables and monitor performance against these
strategic outcomes. Our business 2025-26 plan will be completed and approved
following adoption of this corporate plan. At team planning level, we identify core service
standards and key operational deliverables.
We are transforming our approach to Performance and Improvement activities,
reviewing our Performance and Improvement Framework, and redesigning elements 
of it to better reflect out Connect for Success principles and modern ways of working.
Our Golden Thread 
Page 51

Page 52

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
6
Classification: OFFICIAL
4. Our Vision   
Vibrant and empowered communities, thriving economy, and positive partnerships 
are core components of our vision for Argyll and Bute. The ongoing impact of the 
cost-of-living crisis, housing emergency, predicted population decline and reducing
public sector finances are significant challenges we must navigate on the road to
achieving our vision for a thriving Argyll and Bute. We will build on our track record of
success to achieve the change we want to see for our area.
Vibrant and Empowered Communities
Our vision is for an Argyll and Bute where communities feel listened to, are part 
of decision making and are empowered to deliver locally tailored projects and 
services with the support and facilitation of the council as their trusted partner. 
Where we deliver services, we want to be recognised for consistently delivering
impactful results. We have recently designed and launched an engagement toolkit
and undertaken several public engagement events. We will use learning from these 
to continue building positive relationships and partnerships with our communities.
Thriving Economy
Our vision is for an Argyll and Bute where businesses are thriving, serving the 
needs of visitors and locals, and providing quality local products and employment
opportunities. Improved access to quality and affordable housing supports our 
thriving economy and helps to grow our population.
Positive Partnerships
The key to a successful and thriving Argyll and Bute lies in the relationships and
partnerships that we develop within and out with our area. Overcoming the challenges
we face in achieving our vision of a thriving Argyll and Bute will take teamwork and
collaboration with many partners. We will continue to collaborate positively with
central government, communities and other partners to ensure the needs and voices
of Argyll and Bute are well articulated and understood
We have a vision for a successful,
vibrant Argyll and Bute with a growing
population and a thriving economy. 
A place where communities and
businesses thrive and people want to
come to live, to work and to do business.
Page 52

Page 53

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
7
Classification: OFFICIAL 
5. Our Priorities 
We have seven corporate priorities that will shape our policy and decision making over
the life of this plan. To deliver on these priorities and overcome the challenges we face,
the Council must continue to transform at pace, building on our long-standing culture 
of innovation and use of digital technology. Our strategic approach to transformation
will be underpinned by the principles of Connect for Success: 
Page 53

Page 54

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
8
Classification: OFFICIAL 
Page 54

Page 55

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
9
Classification: OFFICIAL 
Empowered and resilient communities – Our communities are as diverse as our
geography and have varying needs, challenges, and opportunities – all of which they
are well placed to identify. We want to harness that local knowledge with confidence 
and work together to develop shared priorities. 
This priority directly aligns with the Community Wellbeing theme in the ABIOP and will
help us to contribute to this shared plan.
To strengthen our collaboration and support for our communities, we will:
Priority Next Steps / Action
Build stronger connections and
collaborations with communities to
increase empowerment and make the
best use of local knowledge to help
shape delivery of local solutions 
Meeting people where they live –
progressing an engagement
programme for senior leadership
across and around local communities
Enhance and deepen our
understanding of local issues and
improve opportunities for collaboration
– including launch of the Aspiring
Places: Community Projects
programme in Argyll and Bute
Use online tools/digital platforms to
find ways to reach those not in
established groups and start ongoing
conversations about local issues
Take forward a piece of work to
support Area Committees to reshape
their business, decision-making and
overall activities to align with
existing/emerging local plans and
issues, following agreement of
Priorities
Once Priorities agreed by Council –
Area Committee Chairs to have initial
discussion and feed back views to
political leadership as first action
Reaffirm our commitment to refugee
resettlement, valuing the contribution
that new families and residents make
to life in Argyll and Bute
Ensure that our approach to refugee
resettlement has regard to the
availability of housing, employment
and skills locally while being delivered
through national funding scheme
COMMUNITIES
Page 55

Page 56

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
10
Classification: OFFICIAL 
Making Argyll and Bute an attractive choice for families – Giving young people the
best start in life, and ensuring we have the right skills for a prosperous future, are key
elements of making Argyll and Bute an ideal choice for families to stay or to relocate.
The Argyll and lifestyle already has much to offer and, to play our part in making
that more attractive, we will: 
Priority Next Steps / Action
Develop our school curriculums with
the jobs of the future in mind, to build
up a strong local skills base and help
create more opportunities for young
people to stay and grow in their own
communities.
Look at data from across the Council
to identify skills, service delivery and
employment needs locally – to shape
learning opportunities for the short
and medium term which contribute 
to overall population and economic
growth.
Enabling as many young people as
possible go from school to positive
destinations of all kinds.
Work with partners on local further 
and higher education provision and
apprenticeship opportunities that 
meet identified skills, service delivery
and employment needs.
Explore ways to enhance Argyll and
Bute’s early learning and childcare
offer to support employment and
business needs of local families
alongside its role in nurture and
contribution to access to better life
chances for young people.  
Identify measures to increase
provision with partners.
Enable learners to take full advantage
of emerging technology and to be
ready for the ‘jobs of the future’ here 
in Argyll and Bute.  
Pursue opportunities for investment in
schools digital network – 21st century
digital network for schools and wider
education infrastructure.
United Nations Convention of the
Rights of the Child (UNCRC) –
ensuring that views of children and
young people are considered in
decision making.   
Developing our organisational culture
to be receptive to the views of children
and young people in our decision-
making
CHILDREN AND  
YOUNG PEOPLE
Page 56

Page 57

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
11
Classification: OFFICIAL
Continue the programme of
improvement in our schools so that
they are a compelling choice for
families, providing good educational
attainment and supporting the
wellbeing of young people.  
Explore options for Education Review. 
Working to ensure that everyone who needs a home can find one that they can
afford, in the right place, and at the right time – Access to housing is a factor in
almost every aspect of Argyll and Bute’s crucial growth agenda. It contributes to the
success of economic development, recruitment, employment opportunities, service
delivery and much more. Argyll and Bute was the first Council in Scotland to declare 
a Housing Emergency. We must increase pace and be agile, ready to innovate and
prepared to do things differently in order to see swift progress.
Shared prosperity and sustainable business growth in Argyll and Bute – We value
the impact and return on investment that effective, targeted economic development can
have. We recognise that all kinds of resources are increasingly limited and must be used
to deliver shared prosperity, sustainable business growth and the best possible
outcomes for Argyll and Bute.
People are Argyll and Bute’s most important asset in driving forward
opportunities for growth and vibrant local economies – Population growth is crucial
to our economic success. Decline impacts on our ability to sustain and deliver services
in the future. There is a predicted drop of 14.8% between 2018 and 2043, mainly in the
25 to 44 age group. We have a relatively tight labour market, arising from consistently
higher levels of participation and low unemployment, with critical gaps in public services
and key business sectors like hospitality and construction.  This has been exacerbated
in recent years by a decline in the working-age population, migration limitations and
higher levels of economic inactivity particularly in the over-50s age group.
This priority directly aligns with the Housing theme in the ABIOP and will help us to
contribute to this shared plan. 
HOUSING, ECONOMIC  
GROWTH AND POPULATION 
Page 57

Page 58

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
12
Classification: OFFICIAL
We will:
Priority Next Steps / Action
Sharpen focus on the Housing
Emergency Action Plan and other
plans/delivery bodies as appropriate 
in line with the pace required in
emergency.
Refresh and update our Local Housing
Strategy.
Use policy and fiscal levers at our
disposal to speed up delivery – lobby
other agencies where required.
Seek reform or flexibility on use of
Resource Planning Assumption (RPA).
Looking at overarching plans –
Argyll and Bute Local Housing
Strategy
Strategic Housing Investment Plan
Local Development Plan
Oban and Helensburgh Development
Masterplans
Using latest data to reframe and target
activities and resources to the right
places at the right times.
Revisit Strategic Housing Fund.
Examine scope to reduce time spent
in temporary accommodation.
Lobbying work
Drive forward in partnership across 
all sectors to deliver on vital areas 
like key worker accommodation, 
mid-market rentals, private sector
development in addition to activity 
on affordable homes. 
Engagement and partnership working
across all sectors.
Local Housing Strategy review to 
open up greater opportunities for
partnership working and securing
additional resources to support
swifter delivery.
Housing Emergency Action Plan.
Explore scope for greater
commercialisation of Council assets
and otherwise attract external
investment for the Council and
communities.
Build on the existing foundations to
derive further commercial income from
Council assets. Explore opportunities
for Community Partnerships to
divest/operate Council assets. Further
develop the approach to community
Benefits and the opportunities from
planning gain for communities to
augment Council funding.
Page 58

Page 59

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
13
Classification: OFFICIAL
Take a clear ‘return on investment’
approach to allocations of resources
at all levels – prioritise action that
brings people, jobs and business 
to Argyll and Bute through
Maximising community benefit
opportunities from local development
and promote community wealth
building. 
Agree refreshed Economic Strategies.
Development Masterplans.
Critical evaluation of activities,
financial allocations and requests 
and how those will translate into
employment or growth.
Use policy and fiscal levers in our
power to stimulate, attract and
incentivise growth – for example
exploring creation of enterprise zones.
Where power to drive growth sits with
other agencies, lobby for support to
complement the actions we are taking
and investments we are making (e.g.
fuel, transport costs in rural areas)
Engage with Argyll and Bute’s key
sectors and major employers in food
and drink, tourism, construction,
energy and social care to progress
shared priorities and work in
partnership where possible.
Continue to lead on bringing
depopulation to national government
attention.
Bringing together group of
depopulating local authorities to act
together as collective voice.
Engage with Scottish Ministers and
Ministerial Taskforce. 
Page 59

Page 60

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
14
Classification: OFFICIAL 
Keeping people, businesses, goods and services moving through Argyll and Bute
– Argyll and Bute’s geographic mix of rural and island communities mean that transport,
infrastructure and digital connectivity are crucial jigsaw pieces in the drive for growth. 
At the most basic level, we need effective and reliable ways to bring people, goods and
services to Argyll and Bute – and to carry our own products. Like transport connectivity,
reliable, resilient digital links have a highly significant contribution to make to growing
the population and the economy. They can add considerable value to Argyll and Bute’s
position as an ideal choice to locate, offering an attractive lifestyle and opportunities to
learn, work and do business.
In the same context we need to consider the impact of climate change on that essential
infrastructure. 
This particular area is complex given our geography and the range of agencies who
have responsibility for maintaining the resilience of lifeline connections of all kinds. 
Our principles of return on investment, partnership working, and speaking up for Argyll
and Bute and its people will all come into play here. 
This priority directly relates to the Transport Infrastructure theme in the ABIOP and will
help us to contribute to this shared plan.
We will: 
Priority Next Steps / Action
Lobbying for national infrastructure
investment and interventions where
responsibility lies with other agencies –
maintaining pressure for delivery 
at pace of the permanent solution 
for the A83 Rest and Be Thankful.
Political lobbying for urgent action 
on ferry services which brings the
capacity and timetabling needed 
to support lifeline links and routes 
to market.
Establish political lobbying group
(which will tackle a variety of issues),
agree membership and scope.
Agree themes/focus of political
lobbying activity – including A83, 
Rest and Be Thankful, A82 upgrade,
A85 improvements.
Constructive engagement with Scottish
and UK Government Ministers.  
TRANSPORT, INFRASTRUCTURE 
AND DIGITAL CONNECTIVITY 
Page 60

Page 61

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
15
Classification: OFFICIAL
Representing to industry and national
governments on disproportionate
transport, fuel and energy costs which
contribute to higher rural
poverty/deprivation levels and impact
on growth.
Find ways to join our voice with those
of communities who tell us this is a
priority for them too.
Seek full funding for delivery of internal
ferry services, given that responsibility
for these sits with Transport Scotland
Pursue formal request for full funding,
noting previous shortfall.
Use strong data to develop a Transport
Strategy which recognises the
significance of connectivity to
population and economic growth.
Explore options for full transport study
(which can include looking at
integration, organisation options)
following RIS Review. 
Page 61

Page 62

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
16
Classification: OFFICIAL 
We recognise that climate change represents one of the most significant
challenges facing our communities today and in the future. Argyll and Bute
Council has demonstrated our commitment through tangible progress, having
reduced our carbon emissions by 31% over the past 8 years through sustained
investment in energy efficiency and carbon reduction initiatives.
We remain firmly committed to driving down our carbon footprint further, with a clear
target of achieving net zero emissions by 2045, aligned with Scottish Government
climate objectives. Our interim targets ensure we maintain momentum and
accountability throughout this journey.
The Council is building on this foundation through ongoing decarbonisation efforts
across our estate, transition to electric vehicles, renewable energy development, 
and integration of climate considerations across all service areas.
We acknowledge that addressing climate change requires collective action. Argyll 
and Bute Council works collaboratively with the Community Planning Partnership 
to develop and implement region-wide climate initiatives that support communities,
businesses, and organisations in making their own transition to a low-carbon future.
Through this coordinated approach, we aim to transform our local economy through 
a just transition to deliver a sustainable, resilient, and net zero Argyll and Bute for
current and future generations. 
We will:
• Reduce carbon emissions generated by the Council.
• Agree policies in relation to waste, recycling and other environmental issues,
which will inform next steps. 
• Evaluate Council targets for deliverability and improvement.
• Harness opportunities from expansion of renewable energy sector in the area. 
We want to provide the best services we can for the money and resources
available and make clear the standards that our communities can expect.  
ENVIRONMENT        
SUSTAINABLE SERVICE  
DELIVERY
Page 62

Page 63

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
17
Classification: OFFICIAL
We know that this is very important to local people – Over the remainder of this
Council term, local government finances and resources of all kinds will be under
more pressure than they’ve ever been. Resource levels will inevitably inform service
standards and delivery. We need to be more vigilant than ever before about
alignment of investment and action to our priorities. Identifying clear returns and
outcomes for Argyll and Bute, from allocations of resources, must the starting point
of action or investment. 
Fiscal constraints have put pressure on services and limit what we can deliver. 
The operations of the Council have risen to the challenge of meeting substantial
savings year on year and have approved savings totalling circa £50m over the 
10 years to 2025-26. This equates to 15% of the total 2025-26 revenue budget 
and with each passing year, it becomes more difficult to identify savings.
It is important that our models of service delivery are more efficient and more effective,
with clear and achievable standards. We want to transform services efficiently and at
pace, building on our track record of innovation and digital transformation and in ways
that align with the resources we have – a Council fit for the future.
We will:
Priority Next Steps / Action
Provide the best services we can with
the money available.
Expand the RIS Review approach 
to other service areas to ensure we
have the most effective and efficient
delivery models possible.
Develop proposals to expand and make
the most of digital/technology, including
further exploration of AI.
Make clear the service standards that
communities can expect with the
resources available.
Review, update, communicate clear
quality service standards that match
with local needs as well as available
resources.
Completion and implementation of the
Roads and Infrastructure Services (RIS)
Review, particularly creation of robust,
reliable data to inform decisions.
Progress and implement RIS Review.
Play our part in calling for a fair deal for
councils – including asks for greater
flexibilities at local level which helps
better serve community needs.
Part of work of political lobbying group. 
Page 63

Page 64

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
18
Classification: OFFICIAL 
SPEAKING UP FOR ARGYLL 
AND BUTE, ITS PEOPLE AND
ITS COMMUNITIES 
Collective, as well as collaborative, action is necessary to deliver growth on the
scale that Argyll and Bute needs – No single agency alone can deliver on Argyll and
Bute’s overarching aim of significant, vital population and economic growth. We will 
work in partnership with communities, with all sectors, and at all levels as far as possible
to progress Argyll and Bute’s priorities. This will include using our voice as the local
authority to call for action where responsibility lies outwith our control or influence. 
We will:
Priority Next Steps / Action
Call for policy, investment, flexibility,
action - wherever there is a key issue
impacting on Argyll and Bute’s
chances of growth and success and
where responsibility sits outwith the
control of the Council.
Establish political lobbying group,
agree membership, themes, areas 
for focus as set out throughout the
Priorities.
Add our voice as the local authority to
those of our communities when they
are speaking out on issues that are
important to them and where external
action is needed.
Identify needs and opportunities
through engagement programme 
and planned online/digital democracy
activities.
Lobby for more investment in digital
connectivity to boost Argyll and Bute’s
status as an attractive place to live.
Lobby for digital connectivity
improvements to fill the gap in terms of
other opportunities which are available
and funded elsewhere in Scotland, but
which are not practical here due to
geography (e.g. active travel). 
Page 64

Page 65

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
19
Classification: OFFICIAL
6. Our Challenges
and Risks 
Cost of Living
The ongoing cost of living crisis in the UK is felt particularly hard in rural and remote
rural areas. Argyll and Bute has:
• The highest percentage of people living in remote rural areas of all mainland
Councils
• Nearly 70% of all households in Argyll and Bute are at risk of fuel poverty or
extreme fuel poverty
• Despite our relatively high cost of living the average gross weekly pay for full
time workers in Argyll and Bute is £682, compared with a Scottish Average of
£702 (NOMIS, 2024) 
Food, clothing, travel – 
these cost between 13% 
and 185% + more than  
in urban UK       
Page 65

Page 66

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
20
Classification: OFFICIAL
Housing Emergency
Argyll and Bute Council was the first Local Authority in Scotland to declare a housing
emergency in June 2023. This emergency is due to a complex range of challenges
including:
• High numbers on the housing waiting list
• High homelessness
• Low numbers of new tenancies created
• Unaffordable house prices (the average house price is up to 7 times the
average wage)
• 5% less social rented stock than the Scottish Average
• The highest level of second homes ownership in Scotland (6% against the
Scottish average of 0.9%).
In June 2024 a housing emergency action plan was agreed and the Council, together
with our partners, are working to deliver on this plan. 
Financial Outlook
Despite an increase in overall Scottish Government funding for 2025/26, the financial
outlook for Scotland’s councils remains challenging. At its budget setting meeting in
February 2025 Argyll and Bute Council considered the latest budget gap projections
for the period to 2030 these included a best case scenario of £13.3m and worst case
scenario of £55.9m.
The most recent Accounts Commission report ‘Local Government in Scotland –
Financial Bulletin 2023/24’ outlines that councils need to intensify transformation
activity, progressing at scale and pace to ensure their financial sustainability. How
councils plan to use their reserves, make savings and transform their services needs
to become more transparent. The need to consult local communities and clearly
communicate the implications for local services of the budget decisions taken has
never been more important. 
Risks
Many of the challenges facing the Council are intrinsically affected by external socio-
economic, environmental, and geo-political uncertainties as well as ongoing financial
challenges. The Council has Strategic Risk Register which identifies, assesses and
mitigates these. The strategic risk register is regularly reviewed and scrutinised by
the Council’s Audit and Scrutiny Committee. 
Page 66

Page 67

Corporate Plan | 2025 – 2027
Argyll And Bute Council #abplace2b
21
Classification: OFFICIAL 
7. Our Success  
measures 
This Plan will be underpinned by a set of corporate outcomes that will provide
streamlined and focussed performance reporting and key performance indicators.
This will allow us to improve on our Public Performance Reporting. The outcomes 
will detail our aspirations at a high level in addressing the priorities across the
identified themes. Through this we will demonstrate the impact of our work over 
the Council term.
Page 67

Page 68

Classification: OFFICIAL 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead •
Seil …
#abpla
ce2b
Corporate Plan
2025 - 2027 
Argyll and Bute Council
www.argyll-bute.gov.uk 
Page 68

Page 69

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE 
CUSTOMER SUPPORT SERVICES                                                   8 MAY 2025 
ARTIFICIAL INTELLIGENCE POLICY 
1.0 EXECUTIVE SUMMARY 
1.1  Artificial Intelligence (AI) technologies are rapidly advancing and have the
potential to support the Council by enhancing efficiency, improving operations
and assisting with decision-making for some of its key services.  Although the
adoption of AI presents significant opportunities to enhance efficiencies in the
Council, there are significant risks that must be carefully considered prior to
adopting AI within Council operations. These risks are highlighted in a new AI
Policy. All local authorities have been advised by Socitm, the Scottish
Government, and the Digital Office to implement an AI Policy to help staff use
AI in a safe and secure manner. 
1.2  The policy is required to help establish guidelines for the Council in the use of
AI technologies, and to ensure that the use of AI is ethical, complies with all
applicable laws, regulations and Council policies, and complements the
Council’s existing information and security policies including the Councils
Acceptable Use Policy (AUP). 
1.3  We are bringing this policy forward now because AI is much more available
than it has been before. It is now available in our web search engines like
Bing and Edge and is accessible via products such as ChatGPT. 
1.4  It is important for all council users to recognise that Open versions of AI such
as ChatGPT or web browsers that use CoPilot are not secure and should not
be used when dealing with any council information that is confidential,
personal or financial. Any information typed into these tools is openly available
to anyone who uses them. 
1.5  We will be introducing trials of secure CoPilot as part of our M365
environment for some council users later in the year. This will come at
additional cost to our existing licenses, so will be implemented using a
cost/benefit based approach.    
1.6 The AI policy applies to all users of the Council’s data and systems with
access to AI, including elected members. The policy dictates that AI must be
used in a manner that promotes fairness and avoids bias to prevent
discrimination and contribute positively to the Council’s goals and values,
aligning with the Council’s equality and diversity policies.
Page 69 Agenda Item 8

Page 70

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE 
CUSTOMER SUPPORT SERVICES                                                   8 MAY 2025 
ARTIFICIAL INTELLIGENCE POLICY 
2.0 INTRODUCTION 
Background 
2.1 Advanced AI technologies have been developed for use in our day-to-day ICT
and Digital systems. Products such as CoPilot from Microsoft are now fully
integrated within the M365 platform but, while they are designed to complete
tasks very quickly and efficiently, they come at premium costs. These powerful
tools must be used in accordance with law, and in a manner which promotes
fairness while aligning with the Council’s equality and diversity policies. This new
Artificial Intelligence Policy is required to help establish guidelines for the
Council in the use of AI technologies, and to ensure that the use of AI is ethical,
complies with all applicable laws, regulations and Council policies, and
complements the Council’s existing information and security policies including
the Councils Acceptable Use Policy (AUP).   
3.0 RECOMMENDATIONS 
3.1 The Policy and Resources Committee is asked to approve the new Artificial
Intelligence Policy for onward progression to the Council. 
3.2 Members are asked to note that this is a fast paced and rapidly changing area of
technology and that revisions to this report may be required. Any material
changes will be brought for the attention of this Committee. 
4.0 DETAIL 
Applying the Policy 
4.1  The Council is now recognised by the Accounts Commission as an Innovative
Authority and is well placed to lead on a further series of transformational
projects, using AI technology designed to support the council’s ambition for
service improvement and sustainability through digital innovation. Services
are keen to make use of AI based opportunities but the risks of doing so must
be managed and the councils’ systems, data sets, employees, and customers
adequately protected.
Page 70

Page 71

4.2  The new policy provides the necessary guidance for all users of AI and
recommends that a comprehensive Data Protection Impact Assessment
(DPIA) and Security Assessment should be conducted for any project or
process where use of AI is developed or deployed. It recognises that data
entered into an AI system may enter the public domain and provides guidance
on how service users can minimise any risks associated with regulatory
requirements, customer or vendor contracts, or a compromise of intellectual
property. 
4.3  Users are encouraged to use AI for work-related purposes subject to
adherence to this policy. This includes tasks such as generating text or
content for reports, emails, presentations, images and customer service
communications. The policy also encourages initiatives to enhance AI literacy
and skills among all stakeholders, particularly those involved in developing AI
solutions, as well as those using AI technologies in their work. 
4.4  Appendix 3 of this report contains an initial AI factsheet to help explain some
of the issues around AI. A much more detailed FAQ and guidance on how to
apply the policy for staff and elected members will be developed and
published on the Hub. 
4.5  The pace of development and application of AI in this fast-changing
environment is such that this policy will be subject to regular review. Any
material changes to the policy will be brought back to committee for approval.   
5.0 CONCLUSION 
5.1 AI Technologies will help the Council deliver more efficient services. Their use
should be encouraged but managed to ensure users are appropriately
licenced, all applications are ethical and comply with all applicable laws,
regulations and Council policies, and they complement the Council’s existing
information and employment policies. 
6.0 IMPLICATIONS 
6.1 Policy:  Introduces a new Artificial Intelligence policy. 
6.2 Financial:  None. 
6.3  Legal:   None. 
6.4  HR:    All staff to be made aware of guidance and governance
arrangements outlined within the policy and comply
with these.  
6.5  Fairer Scotland Duty: 
Page 71

Page 72

6.5.1     Equalities - protected characteristics: positive impact
identified. 
6.5.2     Socio-economic Duty: None. 
6.5.3    Islands: None. 
6.6 Climate Change: AI uses significantly more electrical power than other
forms of ICT processing and internet searches. Work
will be done to assess how our developing approach to
using AI impacts on our carbon reduction targets. 
6.7 Risk:  The policy is an important aspect of mitigating risks
presented by AI use and potential breaches of
information security and governance through the
inappropriate use of technologies and publishing of
data. 
6.8  Customer Service: AI is a tool that will enhance our Customer Service
Centre digital responses in quality and speed. 
6.9 The Rights of the  None. 
Child (UNCRC): 
Kirsty Flanagan 
Executive Director with responsibility for Customer Support Services 
Policy Lead: Councillor Mark Irvine 
April 2025                                                  
For further information contact: 
Jane Fowler, Head of Customer Support Services, jane.fowler@argyll-bute.gov.uk
Gerry Wilson, ICT and Digital Manager, gerry.wilson@argyll-bute.gov.uk
Stuart McGeachy, ICT Compliance and Security Officer, 
stuart.mcgeachy@argyll-bute.gov.uk 
APPENDICES 
Appendix 1:  Artificial Intelligence Policy 
Appendix 2:  Integrated Impact Assessment – Artificial Intelligence Policy   
Integrated Impact Assessment - Power Apps 
Appendix 3:  AI Factsheet
Page 72

Page 73

Argyll and Bute Council
Artificial Intelligence Policy 
March 2025 
Page 73

Page 74

Contents
1. Background ......................................................................................................... 4
2. Purpose ............................................................................................................... 4
3. Scope .................................................................................................................. 4
4. Governance ......................................................................................................... 5     
Vendors ............................................................................................................... 5     
Copyright and Licensing ...................................................................................... 5     
Ethical Use .......................................................................................................... 6     
Disclosure ........................................................................................................... 7     
Integration with other tools .................................................................................. 7
5. Development, Deployment and Use of AI ............................................................ 7     
Risk Assessment ................................................................................................. 7     
Legal compliance ................................................................................................ 8     
Bias and discrimination ....................................................................................... 8     
Security ............................................................................................................... 8     
Data sovereignty and protection .......................................................................... 8
6. Compliance .......................................................................................................... 9
7. Review ................................................................................................................. 9
8. Acknowledgement ............................................................................................... 9 
Page 74

Page 75

Version Control
Version Creator Changes Date
0.1 Stuart McGeachy Initial Draft 31/07/2024
0.2 Stuart McGeachy Revisions based
on ITMT
comments.
21/02/2025
0.3 Stuart McGeachy Revisions to
Scope and
Disclosure
sections.
24/03/2025
0.4 Stuart McGeachy Revisions to
Governance and
Disclosure
sections based
on Governance
and ITMT
comments.
31/03/2025
0.5 Stuart McGeachy Updated
document font to
Arial and left
aligned.
02/04/2025
0.6 Gerry Wilson Expanded
purpose
following SMT
comments 
17/04/2025 
Page 75

Page 76

1. Background 
1.1. Artificial Intelligence (AI) refers to the development of computer systems
capable of performing tasks that typically require human intelligence, such
as learning, problem solving and decision making. 
1.2. AI technologies are rapidly advancing and have the potential to support the
Council by enhancing efficiency, improving operations and assisting with
decision-making for some of its key services.  Although the adoption of AI
presents significant opportunities to enhance efficiencies in the Council,
there are significant risks that must be carefully considered prior to adopting
AI within Council operations, which will be outlined in this policy. 
2. Purpose 
2.1 The purpose of this policy document is to establish guidelines for Argyll and
Bute Council in the use of Artificial Intelligence (AI) technologies, including,
but not limited to machine learning models, natural language processing
systems and Generative Artificial Intelligence Large Language Models
(GenAI) such as ChatGPT, Google Gemini, Microsoft Copilot. 
2.2 GenAI is one of the most prevalent AI technologies utilised across industries
and applications, allowing users to input prompts to produce various types of
content such as text, images, audio, video, software code and other media. 
The GenAI models can learn and evolve as it trains on data structure and
patterns to produce new data, which is based on the input from the user. 
2.3 We need this policy now because AI is much more available than it has been
before. It is now freely available in our search engines and these versions
operate in such a way that anything we submit for analysis becomes freely
available to other users around the world. Safer versions of AI tools will be
deployed on the Council’s network in the near future. 
2.4 This policy is designed to ensure that the use of AI is ethical, complies with
all applicable laws, regulations and Council policies, and complements the
Council’s existing information and security policies including the Councils
Acceptable Use Policy (AUP). 
2.5 The pace of development and application of AI in this fast-changing
environment is such that this policy will be subject to regular review. Any
material changes to the policy will be brought back to committee for approval. 
3. Scope 
3.1 This policy applies to all users of the Council’s data and systems with access
to AI, including elected members, as well as any other policies and
procedures in support of this policy.   
Page 76

Page 77

3.2 Use of AI must be in a manner that promotes fairness and avoids bias to
prevent discrimination and promote equal treatment and be in such a way as
to contribute positively to the Council’s goals and values, aligning with the
Council’s equality and diversity policies. 
3.3 Users may use AI for work-related purposes subject to adherence to this
policy. This includes tasks such as generating text or content for reports,
emails, presentations, images and customer service communications. 
3.4 The policy  encourages initiatives to enhance AI literacy and skills among all
stakeholders, particularly those involved in developing AI solutions, as well
as those using AI technologies in their work. 
3.5 Particular attention should be given to Governance, Vendor practices,
Copyright, Accuracy, Confidentiality, Disclosure and Integration with other
tools, as described in the following sections. 
4. Governance 
4.1 If there is a business requirement to input personal or confidential
information to GenAI technology, users must complete a Data Protection
Impact Assessment (DPIA) and facilitate the completion of an ICT Security
Assessment for the Councils Security team to assess. 
4.2 Personal information may not have been requested in surveys/consultations
but may have been provided in free text boxes. All such responses must be
reviewed and personal information removed prior to using AI technology. 
4.3 An internal register of Council-approved AI solutions will be kept to ensure
their usage is transparent within the organisation.  All AI solutions must be
published on the The Scottish AI Register to comply with the
recommendations of the Scottish Government. 
4.4 Deployment of AI technologies across the Council must adhere to the
following guidance and guidelines 
NCSC AI and cyber security: what you need to know
NCSC Secure AI system development    
ICO Artificial intelligence 
Vendors 
4.5 Any use of AI technology in pursuit of Council activities should be done with
full acknowledgement of the policies, practices, terms and conditions of
developers/vendors. All AI purchases must be managed through the
Council’s procurement team. 
Copyright and Licensing 
Page 77

Page 78

4.6 Users must adhere to copyright laws when utilising AI. It is prohibited to use
AI to generate content that infringes upon the intellectual property rights of
others, including but not limited to copyrighted material. 
4.7 In addition, users must ensure they comply with licensing terms of any AI
system or tools they utilise. This includes verifying whether the generated
content can be used commercially, modified, or distributed, depending on
the licensing restrictions of the AI service provider. 
4.8 If a user is unsure whether a particular use of AI constitutes copyright or
licensing infringement, they should contact the Legal and Regulatory
Support before using AI. 
Accuracy 
4.9 All information generated by AI must be reviewed and edited for accuracy
prior to use. Users of AI are responsible for reviewing output and are
accountable for ensuring the accuracy of AI generated output before
use/release. 
4.10 If a user has any doubt about the accuracy of information generated by a
given AI tool or solution, they should not use that AI tool or solution without
applying appropriate correction. 
Confidentiality 
4.11 AI systems must comply with data protection regulations, including GDPR
and other applicable laws. 
4.12 Confidential and personal information must not be entered into public GenAI
tools, applications or web sites (like ChatGPT), as information may enter the
public domain. Users must follow all applicable data privacy laws and
organisational policies when using AI.   
4.13 If a user has any doubt about the confidentiality of information, they must not
use that AI tool. 
Ethical Use 
4.14 AI must be used ethically and in compliance with all applicable legislation,
regulations and Council policies. 
4.15 Users must not use AI to generate content that is discriminatory, offensive,
or inappropriate. If there are any doubts about the appropriateness of using
AI in a particular situation, users should consult with their supervisor or
Information Governance Team. 
4.16 Human oversight is essential for the ethical use of AI ensuring that AI
systems operate in alignment with societal values and ethical standards. 
Page 78

Page 79

Human review must be conducted on AI outputs for biases, discrimination
and accuracy. 
Disclosure 
4.17 Transparency in AI is crucial for ensuring accountability, which includes
providing information on how the AI-generated decisions are made.   
4.18 The presence and role of any AI systems may be disclosed in our operations
to all relevant stakeholders, including employees, customers and partners. 
This includes information on how AI systems are used, details of the data
they process and decision making processes they support. 
4.19 Any user content produced via AI must be identified and disclosed as
containing AI-generated information.   
Integration with other tools 
4.20 Application Programme Interface (API) and plugin tools enable access to AI
and extended functionality for other services to improve automation and
productivity outputs. Users should follow OpenAI’s Safety Best Practices: 
• Adversarial testing
• Human in the loop (HITL)
• Prompt engineering
• “Know your customer” (KYC)
• Constrain user input and limit output tokens
• Allow users to report issues
• Understand and communicate limitations
• End-user IDs 
API and plugin tools must be rigorously tested for: 
• Moderation – to ensure the model properly handles hate,
discriminatory, threatening, etc. inputs appropriately.  
• Factual responses – provide a ground of truth for the API and review
responses accordingly. 
5. Development, Deployment and Use of AI 
Risk Assessment 
5.1 Use of AI carry inherent risks. A comprehensive Data Protection Impact
Assessment (DPIA) and Security Assessment should be conducted for any
project or process where use of AI developed or deployed. The risk
assessment should consider potential impacts including legal compliance;
bias and discrimination; security (including technical protections and security
certifications); and data sovereignty and protection. 
Page 79

Page 80

Legal compliance 
5.2 AI systems developed or deployed within the Council must comply with
applicable laws and regulations and with Council policies.   
5.3 Data entered into an AI system may enter the public domain. This can
release non-public information and breach regulatory requirements,
customer or vendor contracts, or compromise intellectual property. Any
release of private/personal information without the authorisation of the
information’s owner could result in a breach of relevant data protection laws.
Use of AI to compile content may also infringe on regulations for the
protection of intellectual property rights. Users should ensure that their use
of any AI complies with all applicable laws and regulations and with Council
policies. 
Bias and discrimination 
5.4 AI may make use of and generate biased, discriminatory or offensive
content.  AI systems developed or deployed by the Council must be regularly
tested for bias by the service users who must take corrective actions to
ensure fairness. 
5.5 Users should use AI responsibly and ethically, in compliance with Council
policies and applicable laws and regulations. 
Security 
5.6 AI systems must be secure by design to protect against data breaches,
cyber-attacks and any other misuse. Regular security assessments and
updates should be conducted to address potential vulnerabilities to ensure
security standards align with frameworks such as Public Sector Network
(PSN) and Payment Card Industry Data Security Standards (PCI DSS). 
5.7 AI may store sensitive data and information, which could be at risk of being
breached or hacked. The Council must assess technical protections and
security certification of AI before use. 
5.8 If a user has any doubt about the security of information input into a specific
AI tool/solution, they should not use that specific AI tool/solution. 
Data sovereignty and protection 
5.9 While an AI platform may be hosted internationally, under data sovereignty
rules information created or collected in the originating country will remain
under jurisdiction of that country’s laws. The reverse also applies. If
information is sourced from AI hosted overseas, the laws of the source
country regarding its use and access may apply. 
Page 80

Page 81

5.10 AI service providers should be assessed for data sovereignty practice by any
organisation wishing to use their AI.   
6. Compliance 
6.1 Any violations of this policy should be reported to the Council’s Information
Governance Team or senior management. Failure to comply with this policy
may result in disciplinary action, in accordance with Council’s Human
Resources policies and procedures. 
7. Review 
7.1 This policy will be reviewed annually and updated as necessary to ensure
continued compliance with all applicable legislation, regulations and
organisational policies.   
8. Acknowledgement 
8.1 By using AI, users acknowledge that they have read and understood these
guidelines, including the risks associated with the use of AI. This policy has
been largely based on the guidance prepared by ALGIM (Aotearoa - New
Zealand) and Socitm (UK).
www.algim.org.nz
www.socitm.net
Page 81

Page 82

This page is intentionally left blank

Page 83

AI Policy – Appendix 3 - Factsheet 
What is AI and what kind of things can it be used for?
AI, or Artificial Intelligence, is computer technology that can perform some tasks that
typically have required human intelligence and in-put. 
It can be used for many things, for example, answering questions, producing minutes
or reports, or supporting customer service. 
How does AI do that?
It does this in different ways. A key thing is that it does everything very quickly. For
example to answer questions the computer technology searches for information
already available on the internet and other digital channels, and from there pulls
together answers based on the information it identifies as relevant to the question
asked. 
What are the potential advantages of AI?
A key benefit is that AI can save employee time and so increase efficiency and
productivity by automating routine tasks, enhancing customer service through
automated answers to questions, and help manage risks for example by predicting
maintenance needs. 
It is also another route for people finding information about the council, for example if
a potential job candidate does a search for Argyll and Bute Council. 
What are its potential risks?
There are significant risks for example in relation to accuracy, information security,
reputation, and political bias. 
• Accuracy: AI pulls together information it identifies as relevant to questions
asked; as the internet holds information that is both accurate and inaccurate,
this means that AI information needs to be checked for accuracy. 
• Information security: AI works in effect like a big library, full of the information
that people upload into it. Once in the AI ‘library’ (or large language model)
the information is available for others to find. Confidential or sensitive
information therefore is not secure.
• Reputation: as AI does not distinguish between what is accurate or inaccurate
information, or confidential or non-sensitive information, it could produce
reputationally damaging information. 
Why do we need a policy for how the council uses it?
We need a policy because, as outlined above, AI offers both advantages and risks to
the council. A policy would be there to help employees assess how to make effective
use of AI and work in the interests of the council and communities in doing so. 
AI has been available for some time, but with the advent of GenAi, where new
content can be created in response to a user’s prompt from search engines such as
Google and Bing, the technology is now much more accessible and therefore we
have to manage all associated risks.
Page 83

Page 84

This page is intentionally left blank

Page 85

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE
CUSTOMER SUPPORT SERVICES                                                   8 MAY 2025 
ARGYLL AND BUTE EQUALITY MAINSTREAMING REPORT 2025 
1. INTRODUCTION 
1.1 As part of equalities duties set out in the Public Sector Equality Duty (PSED), the
Council, Education Authority, and Licensing Board are required to report on their
equality mainstreaming activities every two years. 
1.2 The Equality Mainstreaming Report 2025, which covers the period 2024-2025, is
appended to this covering report. The Mainstreaming Report covers the three
authorities mentioned above. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Policy and Resources Committee approves the
Equality Mainstreaming Report. 
3. DETAIL 
3.1 The Equality Mainstreaming Report (Appendix 1) has been produced to meet the
requirements of the PSED. The Mainstreaming Report sets out how we have
mainstreamed equalities in our everyday work and how we have progressed in
meeting our current equalities outcomes. 
3.2 In addition, this Mainstreaming Report includes the publication of the new set of
Equality Outcomes (approved by the Policy and Resources Committee on 20
February 2025). 
3.3 We are obligated to publish the Mainstreaming Report. We request the committee
to approve the Mainstreaming Report to enable the publication of the approved
version. The Mainstreaming Report will be published alongside workforce data. 
Page 85 Agenda Item 9

Page 86

4 CONCLUSION 
4.1 The Policy and Resources Committee is asked to approve the Equality
Mainstreaming Report. 
5.0 IMPLICATIONS 
5.1 Policy:   There are no policy implications arising directly from
this report. 
5.2 Financial:   There are no financial implication arising directly from
this report. 
5.3  Legal:    The production and publication of the Equality
Mainstreaming Report is required as part of the Public
Sector Equality Duty (PSED). 
5.4  HR:    Workforce reporting and profiling have been completed
as per the requirements of the PSED. 
5.5  Fairer Scotland Duty: 
5.5.1  Equalities: protected characteristics: The Equality Mainstreaming
Report has been produces to fulfil the requirements set out in the
PSED. An Equality and Socio-Economic Impact Assessment was
previously completed with regard to the Equality Outcomes set for
period 2025-2029. 
5.5.2  Socio-economic Duty: No issues relating specifically to our socio-
economic duties arise from this report. An Equality and Socio-
Economic Impact Assessment was previously completed with regard to
the Equality Outcomes set for period 2025-2029. 
5.5.3   Islands: No issues relating specifically to islands arise from this report.
An Equality and Socio-Economic Impact Assessment was previously
completed with regard to the Equality Outcomes set for period 2025-
2029. 
5.6 Climate Change:  No climate change implications arise directly from this
report. 
5.7 Risk:     No risk implications arise directly from this report. 
5.8  Customer Service:  No customer service implications arise directly from
this report. 
5.9 The Rights of the  Some actions identified for the delivery of our Equality
Child (UNCRC):  Outcomes 2025-2029 have been designed to 
complement and embed progress relating to the 
Page 86

Page 87

incorporation of the UNCRC. 
Kirsty Flanagan
Executive Director with responsibility for Customer Support Services 
Policy Lead: Councillor Mark Irvine 
Report prepared: 1 April 2025                                                  
For further information contact:
Jane Fowler, Head of Customer Support Services, jane.fowler@argyll-bute.gov.uk
Chris Carr, OD Project Officer, chris.carr@argyll-bute.gov.uk 
APPENDICES
Appendix 1: Equality Mainstreaming Report 2025
Page 87

Page 88

This page is intentionally left blank

Page 89

Argyll and Bute Council 
Equalities Mainstreaming 
Report and Equality Outcomes 2025 
April 2025 
Page 89

Page 90

Table of Contents
Section 1: Background context ............................................................................................... 3
1.1  Public Authorities covered by this Mainstreaming Report ......................................... 3
1.2  Legislation ................................................................................................................ 3
1.3  Mainstreaming Equality within Argyll and Bute ......................................................... 4
1.4  Key Documents ........................................................................................................ 4
1.5  Learning and Development Activity .......................................................................... 6
1.6  Workforce ................................................................................................................. 7
1.7  Partnership working.................................................................................................. 8
1.8  Equality Forum ......................................................................................................... 9
1.9  Gypsy Traveller Working Group .............................................................................. 9
1.10  Other groups and representation ....................................................................... 10
Section 2: Monitoring and Continuous Improvement ............................................................. 10
2.1  Review of our Equality Impact Assessment process............................................... 10
2.3 Community Engagement ........................................................................................ 11
2.4  Disability Confident accreditation............................................................................ 11
2.5  Review of workforce data ....................................................................................... 11
2.5 Awareness raising .................................................................................................. 11
2.6 Working with refugees ............................................................................................ 13
2.7 Community Engagement ........................................................................................ 14
Section 3: Equality Outcomes (2019-2023, extended to 2025) ............................................. 14
3.1  Argyll and Bute’s Equality Outcomes (2019-2023, extended to 2025) .................... 14
Section 4: Equality Outcomes (2025-2029)........................................................................... 21
4.1 Developing our new outcomes ............................................................................... 21
4.1  Argyll and Bute’s Outcomes (2025-2029) ............................................................... 23
4.2 Equality Action Plan (2025-2029) ................................................................................ 25
Section 5: Workforce Monitoring and Reporting .................................................................... 25
Our detailed workforce reporting has been published separately. (Appendix One:
Workforce as of years ending 31 March 2023 and 2024.) ................................................. 25
6.0  Policy Statement with regard to Equal Pay: ............................................................ 26 
Page 90

Page 91

Section 1: Background context  
1.1  Public Authorities covered by this Mainstreaming Report 
Argyll and Bute Council's Equalities Mainstreaming Report and Equality Outcomes 2025
covers the following listed authorities: 
• Argyll and Bute Council 
• Argyll and Bute Education Authority 
• Argyll and Bute Licensing Board. 
1.2  Legislation 
The Equality Act 2010 brought together for the first time legislation relating to the nine
protected characteristics of race, disability, sex, age, sexual orientation, religion and belief,
gender reassignment, marriage and civil partnership, and pregnancy and maternity. 
The Act requires public authorities, when carrying out their functions, to: 
• Eliminate discrimination, harassment and victimisation. 
• Advance equality of opportunity between people who share a protected
characteristic and those who do not. 
• Foster good relations between people who share a protected characteristic
and those who do not. 
The Equality Act 2010 (Specific Duties) (Scotland) Regulations 2012 and subsequent
amendments are designed to help public sector organisations meet their duties as set out in
the Equality Act. 
The requirements of the Public Sector Equality Duty include: 
• Report on mainstreaming equality. 
• Publish equality outcomes and report on progress. 
• Assess and review policies and practices. 
• Gather and use employee information. 
• Publish gender pay gap information. 
• Publish statements on equal pay. 
This mainstreaming report describes how the three public authorities it covers have been
making progress in these areas. 
That inequality of opportunities is not only an issue for people with protected characteristics
is reflected in other legislation, including: 
• Part 1 of the Equality Act 2010, commonly referred to as the Fairer Scotland
Duty, which seeks to tackle socio-economic disadvantage and reduce
inequalities of outcome. 
• Islands (Scotland) Act 2018.
Since our last mainstreaming report was published, the United Nations Convention
on the Rights of the Child (Incorporation) (Scotland) Act 2024 has come into effect.  
Page 91

Page 92

1.3  Mainstreaming Equality within Argyll and Bute 
Mainstreaming equality means integrating equality into an organisation’s day-to-day working.
This means taking equality into account when acting as an employer, or planning and
providing services. 
1.4  Key Documents 
Previously, the Council has aligned its corporate outcomes with those of the Community
Planning Partnership. This is no longer the case.
In September 2024, the Council approved a new set of priorities and principles. These were
one of the inputs we considered when developing our new set of equality outcomes.
As part of wider work looking at the council’s performance management arrangements, we
are working to rationalise our strategies and create a new set of corporate/strategic
outcomes. We recognise the need to ensure our equality work and outcomes align with wider
organisational strategy, and this is reflected in our newly adopted equality outcomes. (See
section 4). 
The Council's Constitution 
The Council's Constitution : 
• Sets out the council’s principles of decision making; these include a
commitment with regard to human rights and the Public Sector Equality Duty
(part A, page 10).  
• States that responsibility for determining and implementing the Council’s
policies in relation to the promotion of equality of opportunity and initiatives to
combat discrimination sits with the Policy and Resources Committee (Part C,
page 70).
• Sets out the Council's requirement that contracts awarded by the Council
contain an obligation obliging contractors to comply with all duties arising from
the Equality Act 2010 (Part E, pages 187-8). 
Employee Code of Conduct 
The Employee Code of Conduct includes a section which deals specifically with
Equality and Diversity. It sets out the council's commitment to equalities and
signposts readers to the council's Equality, Diversity and Inclusion Policy, Equalities
Mainstreaming Reports, and Dignity at Work Policy. It states: 
The Council will promote an ethos in which self-respect and respect
for others are of the utmost importance. All individuals will be valued
equally and therefore be given every opportunity to fulfil their
maximum potential in society. The Council insists that those who
suffer discrimination, whether direct or indirect, receive fair
treatment and adequate remedies and affirms that it will address
appropriately all sources of discrimination.  
The Code of Conduct makes it clear that 'any instances of discrimination, harassment
or victimisation at work will be viewed as a serious matter'. 
Page 92

Page 93

The Employee Code of conduct is available on the Council's My Council Works
website, which is accessible to any employee with internet access. It is also
appended to the Council's Constitution (as Part F part 3). 
Equality, Diversity and Inclusion Policy 
The purpose of the Council’s Equality, Diversity and Inclusion Policy is to make sure
that the organisation, employees and elected Members do not unlawfully discriminate
against people with protected characteristics as set out in the Equality Act 2010. It
also ensures that we oppose and avoid all forms of unlawful discrimination, and
ensures equality, fairness and respect for all in the council’s employment. The
Equality, Diversity and Inclusion Policy includes links to other relevant documents
and resources: 
• Manager’s Guide to Recruitment and Selection.  
• Dignity at Work Policy:  Eliminating Workplace Bullying and Harassment
Policy and Procedure.  
• Disciplinary Procedures and Code of Practice.   
• Grievance Procedure.    
• Employee Code of Conduct.    
• Code of Conduct for Councillors.   
• Guidance on the Councillors’ Code of Conduct.  
• Advice Note for Councillors on Bullying and Harassment.  
• Equality and Socio-Economic Impact Assessment. 
• Complaints.   
• Phased Return to Work and Other Reasonable Adjustments: Manager’s
Guide.   
• Supporting Attendance at Work Policy. 
Procurement 
Section 4.3 of the Council's Procurement Strategy 2022/25 states: 
The Council is mindful that the impact of procurement is far greater than this
definition of a ‘process’ and our vision, objectives and principles as set out in
this Strategy illustrate the contribution that effective procurement arrangements
can make to wide ranging socio-economic agendas. These include equality and
diversity, a successful local economy, a thriving voluntary and third sector,
environmental issues and value for money for Argyll and Bute residents. 
Section 5.2 includes the following commitments: 
Ensuring procurement activity contributes towards the Council’s general
Equality Duty towards all stakeholders in Argyll and Bute and beyond; 
Continuing to promote sustainability, fair work practices and the importance of
equality and equal treatment through procurement. 
Section 5.5 covers the mandatory requirements of the Procurement Reform (Scotland) Act
2014 and Statutory Guidance Obligations. Item 5 relates to 'Payment of a living wage – to
persons involved in producing, providing or constructing the subject matter of regulated
procurements’. 
Page 93

Page 94

Argyll and Bute's Sustainable Procurement Policy 2022/25 also makes reference towards
equalities, including the following: 
d) In relation to social considerations, our priorities will be: 
• To ensure there is no intentional discrimination against specific groups of
people when undertaking procurements - Equalities and Diversity
considerations will be embedded throughout the procurement process; 
• To ensure that our contract terms require suppliers to support the health,
safety, welfare and rights of their employees and supply chain –
ensuring that the Council does not support human trafficking or modern
slavery. 
Education
The council’s website contains key documents and information relating to the following
topics:
• Additional Support Needs
• Argyll and Bute's Autism Strategy 
• The work of the Corporate Parenting Board and a link to the Corporate Parenting
Strategy.
• Mental health: guidance about mental health and wellbeing in children and young
people.
• Argyll and Bute Children and Young People's Service Plan
• School uniform scheme: describes how Argyll and Bute Council is working with its
schools and third sector partners to roll out an innovative scheme that sees school
uniforms children have outgrown being reused or recycled, thereby ensuring all
students have access to uniforms. 
1.5  Learning and Development Activity 
All staff are required to complete equalities training. The council's Equality and
Diversity e-learning course is mandatory for all networked staff and should be
completed as part of induction. The training is available through our online e-learning
platform, LEON. 
Our e-learning equality training course is also available to community groups within
our area via the council’s website.
In addition to our mandatory equality and diversity course, we host further equality-
related resources on LEON. These included e-learning courses, podcasts, and
recorded webinars and cover topics including:
• Neurodiversity
• Identifying ableist language
• Children’s rights
• Digital accessibility
• Allyship
• Unconscious bias
• Plain English
• Menopause
Page 94

Page 95

• Mental health
• Deaf awareness
• Engaging with communities
• Various resources relating to gender-based violence and domestic abuse
• Protecting children
• Trauma informed training.
Equalities is a standing item on the agenda of the regular meetings held by the
council's Training Centre; these meetings involve all people who are involved in the
delivery of training. 
The Violence Against Women and Girls Partnership delivered a number of training
events in 2023/4 and 2024/5. In addition to events focussing on domestic abuse, they
also covered human trafficking, harmful traditional practices, women’s rights
workshops, and animal abuse as a form of coercive control.
Professional Learning Programmes are in place for Education staff. The Argyll and Bute
Career-long Professional Learning (CLPL) catalogue provides a range of professional
learning opportunities for staff at all levels. This has led to an increased awareness of
equalities and knowledge of both internal and external supports that are available.  CLPL
sessions include:
• Young Carers – Carers (Scotland) Act 2016: how to identify young carers and covers
the young carers statement
• Mentors in Violence Protection (MVP): a peer mentoring programme that gives young
people the chance to explore and challenge attitudes, beliefs and cultural norms that
underpin all forms of gender-based violence in our society
• Keeping the Promise: three sessions to support staff to achieve the ‘I Promise Award’
• Money Counts: the course aims to build the confidence of staff to offer income
maximisation help and explains how to ask about money worries and where and how
to refer for support.
All staff are signposted to external equalities CLPL offers via the Argyll and Bute Leadership
and Professional Learning website. External offers include:
• Education Scotland Professional Learning Activities: becoming an anti-racist
educator; Racial Trauma: the consequences of racism on mental wellbeing; and
Talking about racism: steps to improve racial dialogue in education
• GTCS Equality and Diversity Hub
Professional Learning about equalities also features in the Argyll and Bute Probationer
programme and Aspiring to Headship programme. 
In addition, the Head Teacher Conference structure allows for one annual conference that is
dedicated to the priorities of the Wellbeing, Inclusion and Attainment team, ensuring equality
priorities remain a strong focus.  Agendas for the meetings alongside evaluations are
evidence of the impact of this approach. 
1.6  Workforce
Workforce planning has been embedded across the organisation. 
Workforce planning requires we understand the current profile of our workforce and
identifies how we can make sure it will meet the future needs of the organisation. Key
outcomes of the workforce plan include ensuring we have a balance between
Page 95

Page 96

younger and older employees and the health and wellbeing of our employees is
supported.
Workforce planning meetings are held annually, during which HR Business Partners
and Third Tier managers discuss workforce risks. Ahead of these workforce planning
meetings, Services are provided with a dashboard showing the profile of their
workforce. 
We also monitor the workforce through regular Health of the Organisation reports. 
1.7  Partnership working 
Examples of partnership working and groups include the following:
• Community Planning Partners are invited to attend the council’s Equality
Forum meetings. 
• We have an active Violence Against Women Partnership operating within the
area.
• Employability Partnership.
• UNCRC implementation group.
• Ukrainian Resettlement Group.
• Child Poverty Action Group.
• Financial Inclusion Advisory Group. 
Much of the work relating to socio-economic disadvantage within Argyll and Bute is
managed through the FIAG and the child poverty action group.
Membership of the FIAG is drawn from elected members, council officers and
partners. The FIAG fulfils an anti-poverty role, covering and taking account of the
Fairer Scotland Duty.
The HSCP has previously shared the Council’s approach to Equality and Socio-
Economic Impact Assessments and is going to adopt the council’s new Integrated
Impact Assessment process. This brings Council and HSCP processes into closer
alignment. 
Education works collaboratively with HSCP, Live Argyll and third sector organisations
through the UNCRC Working Group and in line with Argyll & Bute’s Children and Young
People’s Service Plan.
Planet Youth is a community partnership approach helps us learn about what is needed to
keep our young people safe, healthy and happy. In Argyll and Bute, the Planet Youth project
is led by Education and Public Health.  This shared approach has helped improve strategic
links.  The intention is to further enhance strategic links through the work of a central
coalition to be established in 2025; this will help support the work of the local coalitions that
are already in place.  
The Planet Youth project’s survey, carried out every two years, has allowed us to capture
data about young people’s experiences in five of our nine secondary schools. Data from the
Planet Youth survey and approach is already informing other priorities such as the Shaping
Places for Wellbeing project, Child Poverty Action Plan and the Sexual Health Strategy
Group. 
Page 96

Page 97

1.8  Equality Forum 
Set up in 2013, the council's Equality Forum has been running for over a decade. The
forum’s Its Terms of Reference were reviewed and updated in early 2018 and again
in 2023.
The purpose of the Equality Forum is to enable issues relating to equalities to be
raised. In turn, the forum helps Argyll and Bute Council to deliver its obligations as
set out in the Equality Act 2010. 
Meetings take place quarterly. However, members of the Equality Forum may use the
forum as a 'sounding board' at any time, with such communications taking place
outwith the formal meeting cycle. 
Membership of the Equality Forum is drawn from across council Services and partner
agencies, enabling better coordination and collaboration. 
1.9  Gypsy Traveller Working Group
In 2019 the Scottish Government and the Convention of Scottish Local Authorities
(COSLA) launched the first ‘Improving the Lives of Scotland’s Gypsy/Travellers’
strategy. One of the key aims of the strategy was for the Gypsy/Travellers community
to ‘have a seat at the table, are listened to, and have a say in the decisions that affect
their lives’. The Gypsy/Traveller Working Group (GTWG) was established as the
forum which aims to make this happen in Argyll and Bute.
The responsibilities of the GTWG include:
• Understanding the accommodation needs and preferences of
Gypsy/Travellers to inform future provision
• Work with Gypsy/Traveller communities to raise awareness of rights and
entitlements
• Ensure that our public services are responsive to Gypsy/Travellers needs and
preferences
• Provide leadership to tackle racism and discrimination
• Strengthen community development and engagement
• Work with Gypsy/Travellers to improve their involvement in national and local
decision making
The core membership of the GTWG includes representation from the key strategic
partners involved in delivering accommodation, health, education, advocacy, and
community safety for the gypsy/travellers community as well as community
representation which is central to the effectiveness of the group. 
Core partners include:
• Gypsy/Travellers Community
• Argyll & Bute Council
o Housing Services
o Education
o Community Development
o Regulatory Services
o Legal & Regulatory Support
• Argyll Community Housing Association (ACHA)
• Fire Scotland
• Fyne Homes
Page 97

Page 98

• MECOPP
• Police Scotland
• STEP
• West Highland Housing Association
Community representatives have identified a number of initial priorities to be taken
forward by the Gypsy Traveller Working Group. 
• Engagement: Over the years there have been many round table discussions.
However, the community often felt there were no outcomes from these. The
establishment of the GTWG has been welcomed to co-ordinate future actions.
• Awareness: The community would like to see actions to try breaking the
stigma, and raising awareness of the issues of the discrimination, they
experience.
• Education: There is a lot of bullying experienced in local schools by
Gypsy/Travellers. To try to address, it was agreed the Education system was
the best way to reach younger generations to raise awareness of
Gypsy/Traveller community culture.
• Accommodation: The GTWG have acknowledged that both sites
Dunchologan and Bayview require significant upgrades to meet long-term
needs of current and future tenants.  
1.10  Other groups and representation 
Other groups that deal with aspects of equality and fairness include but are not
limited to: 
• UNCRC Incorporation Group: the purpose of this group is to ensure
Children’s Rights are embedded across the organisation in line with
legislation and best practice.
• TU Liaison Group. 
• Strategic and Departmental Management Team meetings.
• LGBTQ+ Network (Education led).
• Mentors in Violence Prevention Steering Group (Education Led).
• Violence Against Women Partnership 
Section 2: Monitoring and Continuous Improvement 
2.1  Review of our Equality Impact Assessment process 
In 2024/5, we reviewed and replaced our Equality and Socio-Economic Impact Assessments
with a new Integrated Impact Assessment process. We did this for several reasons:
1) The Equality and Socio-Economic Impact Assessment form needed to be amended to
meet website accessibility standards
2) In a review of our EqSEIA arrangements, carried out in 2023, Internal Audit
recommended we develop a proposal for an online tool
3) The number of impact assessment frameworks we have to consider when developing a
new proposal has increased.
Page 98

Page 99

The new Integrated Impact Assessment includes the following impact assessments:
• Equality
• Fairer Scotland Duty
• Island Communities: we have amended the questions asked in this section of the
impact assessment
• Children’s Rights and Wellbeing: this is a new section
• Consumer Duty: this is a new section.
Our online tool guides people through the impact assessment process, with guidance built
into each section to facilitate completion.
To coincide with the launch of the new tool and process, we communicated the changes
through emails, posts on the MyCouncil Works website, an article in Cascade (the council’s
monthly employee newsletter), and webinars to which all officers are invited. We have also
arranged bespoke demonstrations of the new tool to groups of officers upon request. 
2.3 Community Engagement
We have developed and published a Community Engagement Framework. This Framework
is a resource for staff and elected members and gathers in one place
• information on methods of engagement
• tools to engage
• the case studies and contacts to assist with supporting engagement to be relevant
and inclusive. 
See section 4 for more details. 
2.4  Disability Confident accreditation 
The Council reaccredited as a Disability Confident Employer in January 2025. The
current accreditation is valid until January 2028. 
2.5  Review of workforce data 
We continue to engage with the Society of Personnel & Development Scotland
(SPDS) with regard to improvements to our workforce data, notably around pay gap
reporting. 
We have recently changed our Human Resources and payroll software. As part of the
ongoing work to embed the new system, work will continue to encourage the
volunteering of equality information. This is reflected in the new equality outcomes for
2025-2029 and actions to deliver them. (See section 4.) We recognise the need for
higher rates of disclosure to meet the future requirements for more detailed and
robust pay gap reporting. 
2.5 Awareness raising 
There are two kinds of awareness raising which go on within the organisation. The
first relates to work targeted at staff, relating specifically to the work they do. The
second relates to awareness raising activities which are broader in scope and reach
Page 99

Page 100

(for example through wellbeing webinars and programmes, promotion of events
relating to the 16 Days of Action against gender-based violence, Pippa’s podcasts, or
social media posts to coincide with awareness days).
Education has actively supported awareness raising of Children’s Rights with staff, learners
and wider community through the UNICEF Rights Respecting Schools Awards.  We currently
have 100% of our schools registered for the award and are working towards 100% of our
schools being accredited.  
In 2024, Argyll and Bute launched the Young Carers Challenge.  The challenge is facilitated
by Carers Trust Scotland and requires schools to have in place a Young Carers Procedure, a
Young Carers Champion, partnership working with carers centres, evidence of case studies,
appropriate data recording on SEEMIS (Education’s Management Information System), and
awareness raising activity.  We will monitor engagement with the challenge and aim to have
all schools signed up to this challenge by the end of 2025.
Whilst being care experienced is not a protected characteristic, our Education Service
continues to raise awareness of this life experience and work towards Keeping the Promise
by 2030.
We are actively committed to Education Scotland’s Promise Award programme. This
professional learning programme aims to promote The Promise message and reduce stigma
attached to care experience to anyone working in an education setting. Our Care Experience
Education team were the first team in Scotland to receive We Promise team accolade with
our Chief Officers Groups being the first local government senior leadership team to achieve
the We Promise Award. 
Alongside this, individuals and whole settings are participating in training to achieve I
Promise and We Promise. This is leading to increased understanding of what it is to be care
experienced and feedback evidences positive changes in practice from a range of adults
working in our settings. 
Argyll and Bute continue to demonstrate their commitment to our care experienced children
and young people by having a dedicated team to both support, challenge and raise
awareness of care experience across our settings.  Each setting has a Designated Manager
for care experienced children and young people who is responsible for ensuring care
experienced individuals have the support they need to achieve their potential.
Our school data system discreetly identifies each pupil who has care experience, supporting
our practitioners to be mindful of their approach.  In addition, e-mails with information and
opportunities specifically in relation to The Promise are shared with our settings regularly to
continue to raise the profile of this cohort.
Teachers and Educators cannot support children and young people unless they have timely
access to the right information that they need. In Argyll and Bute we made it a priority to
create a website solely for practitioners to access everything they need in relation to
Additional Support Needs. This allows practitioners to spend more time on what they do best:
teaching and learning.
The Inclusion and Equality Team has created a number of guidance documents to support
teachers and educators. The Managing Challenging and Distressed Behaviour Guidance has
been a crucial piece of guidance to help staff work with some of our most vulnerable pupils
so that they are included within the school environment irrespective of the challenges they
may be facing. 
Page 100

Page 101

2.6 Working with refugees
The Council has identified ‘reaffirm[ing] our commitment to refugee settlement,
valuing the contribution that new families and residents make to life in Argyll and
Bute’ as one of the Council’s priorities (2024-2027). 
The council and its partners have welcomed refugees from Syria, Sudan,
Afghanistan, and Ukraine to our area and offers them support. The nature of the
support given is tailored according to the relevant schemes.
Following a review of the outcomes for unaccompanied asylum seeking children 
Argyll and Bute a new model of support was developed in Autumn 2023. This has
seen the support for UASC over the age of 16 transfer from the Social Work
Throughcare team to the Resettlement team and the development of a new
Resettlement Throughcare pathway.
Under our new Resettlement Throughcare pathway model and the associated
support those under 16 continue to be accommodated in children’s houses or foster
care. Those over 16 move directly into leased properties where they are supported to
live independently and are taught life skills.
For further information see Unaccompanied Asylum Seeking Young People in Argyll
and Bute.
As of June 2024, In Argyll and Bute we were supporting over 300 displaced persons
form Ukraine within our communities.
The council’s resettlement team and the wider multi agency partnership provide
humanitarian support to recover from trauma, to resettle into a new community and to
navigate the complexities of life in the UK. 
Many of our Ukrainian refugees have come to Argyll and Bute through the Scottish
Government’s welcome accommodation, hotels, and been matched by the
resettlement team to a host or been allocated social housing or sourced private
rented properties. 
Researchers from Glasgow University have produced A Report on the Emergency
Resettlement of People from Ukraine in Argyll and Bute.
The Lead Teacher for Leadership and Career-long Professional Learning (CLPL) has
supported Ukrainian refugees who have teaching experience or a teaching qualification from
Ukraine through the Argyll and Bute Teacher Career Pathway.
Since 2022, Classroom Assistant posts have been created for teachers on the pathway to
support Ukrainian pupils in Argyll and Bute and to develop the skills and knowledge required
to register with GTC Scotland. 
Colleagues on the Teacher Career Pathway have attended Career-long Professional
Learning sessions on Curriculum for Excellence, BGE and Senior Phase, Nurture and
Relationships. Teachers on the pathway also have access to the Argyll and Bute CLPL
Catalogue and are supported by school staff to develop their knowledge and understanding
of Scottish education. 
The Lead Teacher for Leadership and CLPL has supported one of the teachers through the
GTC Scotland application process and they have recently received Provisional Registration.
A placement has been arranged at a local school for the teacher to complete the required
number of days in order to become a Fully Registered Teacher in Scotland. 
Page 101

Page 102

Temporary funding has been used to create a temporary Education Support Officer post that
provides additional support to schools in relation to supporting refugee/asylum seeking
children, young people and their families.  Training has been delivered in relation to
supporting children with English as an additional language (EAL). Guidance on supporting
children with English as an additional language will be in place by April 2025. 
We continue to support participation in Education Scotland’s Building Racial Literacy
Programme.  To date we have 3 staff who have completed the programme (one secondary,
one primary and one from the central team). A further two staff are currently working towards
the completion of the programme. 
2.7 Community Engagement
The Council has recently produced a new Community Engagement Framework. This is
designed to enable a consistent approach to how we engage with our local communities.
To develop the framework, a Community Engagement group was set up, bringing together
officers from across the council. Although the Framework and its associated resources have
been approved and published, the group will continue; raising awareness of, and sharing
good practice across the engagement is key to the success of this group. This group has
also shown the potential of bringing officers together to create synergies that might otherwise
be lost in the siloed organisational structures of the council.
A similar approach is being taken by the council’s Data Advisory Group; the latter will be key
to improving the collection and use of equality-related data. This is reflected in our new
equality outcomes / equality action plan.
See section 4 for more details about the Community Engagement Framework. 
Section 3: Equality Outcomes (2019-2023, extended to 2025) 
3.1  Argyll and Bute’s Equality Outcomes (2019-2023, extended to 2025) 
The Council, Education Authority and Licensing Board developed new Equality
Outcomes for the period 2019-2023. Although our equality outcomes were reviewed in
2023, we did not make changes to them at that time because:
• the current ones were still seen as being fit for purpose;
• Scottish Government was undertaking a review of the Public Sector Equality Duty and
was considering the introduction of national outcomes in 2025 which would have given
any new outcomes formulated at that stage only two years of life, and;
• extending our outcomes by a further two years gave us the opportunity to realign our
outcome setting timetable to other listed authorities. (We were out of sync with other
local authorities following a review of outcomes a number of years ago.) 
Outcome: We support our workforce, encouraging participation across all age
groups 
Duty: Advance equality of opportunity 
Protected characteristics: All, with particular attention to age 
Page 102

Page 103

Purpose: We believe that all employees, including those from all the protected
characteristics, should be encouraged, and have equal opportunity, to participate fully
within the workforce. This principle is set out in the council’s Equality and Diversity
Policy. 
We recognise that the Council, in common with the population of Argyll and Bute
more widely, has particular issues and risks relating to the age of our workforce. This
is why this outcome emphasises age. 
We actively encourage young people to join our workforce, to provide long-term
opportunities for them in our area and to create our workforce for the future. 
Actions identified to tackle this challenge relate to succession planning, upskilling of
staff, and the recruitment of apprentices.
In 2023/24, 14 Foundation Apprentices (Social Services Children and Young People)
were enrolled. In 2024/2025 this figure rose to 22. 
In 2023/24, 3 Modern Apprentices (Social Services Children and Young People) were
enrolled. In 2024/2025, the figure was 2. One of the Mas has gone on to secure
employment with the council. Also in 2024/5, one Modern Apprentice enrolled in
Roads and another in Customer Support Services. 
In addition, through our workforce planning process, solutions are being investigated
to resolve challenges around non-statutory childcare provision and to ensure that
resilience is put in place to ensure continuity of service should staff who work with
minority groups leave. This is important where the numbers of staff involved are low,
making their areas of work vulnerable to change.
Work is starting to identify ways to encourage the retention of the 55+ workforce. This
work will continue over the next reporting period.
We are also engaging with the SPDS’s Equality and Inclusion group which is looking
at ways to recruit more diverse workforces; it is benchmarking activity with other
council’s and aims to share good practice and recommendations for the future. 
Outcome: We promote diversity across occupational groups  
Duty: Advance equality of opportunity 
Protected characteristics: All, with particular emphasis on sex 
Purpose: The Council has a highly segregated workforce in some types of job. For
example, people working in home care are 99% female. By contrast, employees in
Roads and Amenities and IT are predominantly male. We aim to widen opportunity
for people in job roles that they may not have considered otherwise and create
opportunity for all. 
See previous outcome and previous Equality Mainstreaming reports. 
Outcome: We have improved engagement with protected groups  
Page 103

Page 104

Duty: Foster good relations 
Protected characteristics: All 
Purpose: We aim to make sure the voices and opinions of people from protected
groups are heard when we engage with our service users. This is particularly
important when people from particular protected groups may have different
experiences or needs and whose voices may not be heard so clearly. 
Digital Accessibility
Argyll and Bute Council is committed to ensuring that our online services are accessible to all
residents. 
To enhance awareness and understanding of digital accessibility, we have developed in-
house training materials for staff; these are available on LEON. This training material helps
make sure that employees are equipped with the necessary knowledge to create and
maintain accessible digital content. 
The council’s Webteam has worked closely with its Communications team to update
corporate document templates to meet accessibility requirements. The updated templates
are published on our MyCouncil Works site, ensuring that staff have easy access to these
resources. 
To ensure transparency and compliance with the regulations, we are currently reviewing all
accessibility statements across our websites and web applications. This review will ensure
that the statements are up to date, accurate, and reflective of our ongoing commitment to
digital accessibility. 
The latest Silktide Index report, which evaluates website accessibility across the public sector
shows that our commitment to accessibility is being recognised. In February 2025, Argyll and
Bute Council achieved a ranking of 29th (out of 364 websites tested) with an overall
accessibility score of 99% against the WCAG 2.2 spec. This demonstrates our continued
progress in making our digital services more inclusive and user-friendly. 
To further support accessibility, we have introduced the Recite Me toolbar on our website.
This tool provides users with various customisation options, including text-to-speech
functionality, reading aids, and styling adjustments, allowing individuals to tailor their
browsing experience to their needs. It is important to note that while Recite Me offers
additional tools that can be helpful to many users, it does not resolve underlying accessibility
issues within the website itself. True accessibility improvements require adherence to WCAG
2.2 guidelines and the ongoing development of fully inclusive web content. Progress towards
this can be seen in our Silktide report. 
Additionally, we have incorporated bespoke customisation features to Recite Me to facilitate
easy access to Gaelic translation. This ensures that Gaelic-speaking residents can fully
engage with our online services in their preferred language. 
Child Friendly reports
UNCRC legislation has introduced the requirement for Child Friendly Reports in all matters
that affect the child/young person. Working through the Children and Young People’s Service
Plan and the UNCRC Group, we have developed a range of approaches to report to children
and young people. One page versions of The Child Poverty Action Plan, Children and Young
Person’s Service Plan and the UNCRC plan have been created, all co-produced with
children and young people. 
Page 104

Page 105

Tackling Rural Poverty
The council is working in partnership with the Poverty Alliance as one of the pilot areas in the
Tackling Rural Poverty project. Work has in included the creation of a lived experience
panel. In turn, this panel has responded to engagement activities around the council’s
budget, discretionary housing payments, and the proposed introduction of the visitor’s levy.
See also section 1.9. 
Outcome: People with protected characteristics have improved experiences of
services 
Duty: Advance equality of opportunity; foster good relations 
Protected characteristics: All 
Purpose: We aim to make sure that, as far as possible, our services meet the needs
and aspirations of people from protected groups and that we work to improve their
experience of our services. 
For information about work around digital and website accessibility, see above. For
information about refugees, see section 2.6. 
Learning Centres
In Argyll and Bute, our Learning Centres continue to provide accessible, supportive and
inclusive learning environments where children and young people can thrive and reach
their full potential supported by staff who are experienced in severe and complex needs. Our
Learning Centres develop individualised curriculum plans to include a wide range of flexibility
to support all learners’ needs. The focus is on providing holistic education where we meet the
social, emotional, physical and educational needs of our children and young people. 
Our plans to increase the equity of specialist provision for children and young people with
complex needs received Council approval in August 2023. We are addressing gaps in
provision and we are now creating more high quality Learning Centre provision to serve all four
geographical areas here in Argyll and Bute. New facilities will include accessible teaching and
outdoor spaces. 
CALL Scotland
We liaise with CALL Scotland regularly to support learners in Argyll and Bute. Communication
is crucial to a child or young person being able to be an active participant in their learning and
within the wider world; CALL supports teachers and schools to implement best practice and
technology to support a wide range of pupils with varying communication needs, including:
• eye gazing technology
• visual communication for non-verbal pupils, and
• technology to support children with literacy issues such as dyslexia. 
Care experienced children and young people
Page 105

Page 106

We have approximately 300 care experienced children and young people (CECYP) in
educational settings across our authority at any given time. Our care experienced children
and young people are included and supported through existing authority policy and guidance.
Across our educational settings, staff undertake mandatory training which raises their
awareness of some challenges our care experienced children and young people can face. 
This, alongside wider training opportunities such as nurture and trauma-informed practice,
supports our staff to build positive relationships our care experienced individuals.  Feedback
from our care experienced children and young people has evidenced that having positive
relationships in their education setting is crucial to their sense of belonging.  Investing in our
workforce is having a positive impact, ensuring our care experienced children and young
people area able to access their right to education.
We have invited the representation of our care experienced children and young people, for
example at senior leader conferences which were attended by two of our Children’s Houses,
through participation project opportunities, and working directly with members of the Care
Experience Education Team (CEET).  Our CEET can link school and home and work
towards removing any barriers to education, leading to increased wellbeing and attainment
for our care experienced children and young people. 
The CIRCLE Framework
The CIRCLE Framework is a way of organising and supporting input using a staged system
of support, beginning with setting up an inclusive classroom.
CIRCLE focuses on whole school and classroom environments in terms of the physical
environment, the social environment and structures and routines. Rather than thinking about
what a learner can and can’t do or only thinking about their underlying ability or disability, the
CIRCLE framework encourages us to think more widely, particularly paying attention to
aspects of the environment, which impact on the child.
This promotes the implementation of a culture of inclusion and equality across schools in
Argyll and Bute, encouraging regular consultation with school leaders and practitioners,
parents and young people through a whole school approach. Training education practitioners
in primary and secondary schools across Argyll and Bute in Inclusion in Practice, The
CIRCLE Framework aims to support equity in Argyll and Bute. Promoting effective inclusive
practice within the classroom and school environment using the CIRCLE Framework of
Inclusion, raises awareness of how to promote a learner-centred approach where all learners
are listened to and involved in the management of their own learning.
CIRCLE provides the tools to support the assessment, documentation of evidence of
assessment, and the supports and strategies to utilise, informed by need and
observation.  This promotes a whole school approach to inclusion, creating and maintaining
inclusive classrooms, supporting learners with skills, supports and strategies to develop
independence in their learning and promoting collaborative partnership working.  Learners
are listened to and involved in the management of their own learning and able to access
learning alongside their peers. At the centre is evaluation of the environment in which young
people learn, modifications to the environment, both physical and social, establishing
structures and routines and approaches to enhance motivation.
Often when we consider adapting a child’s environment, we think about the physical space
around the child and the resources in place to support them. Equally important is the Social
Environment; the attitudes, expectations and actions of the people around the child. Adapting
our communication to match a child’s developmental level and communication style, can
have a real impact on how well that child is included within the class and school.
Page 106

Page 107

Outcome: We take the views of people from protected groups into account when
we change our services. 
Duty: Advance equality of opportunity; foster good relations 
Protected characteristics: All 
Purpose: We aim to make sure that the needs and opinions of people from protected
groups are taken into account when we make changes to the way we deliver our
services. This helps us to make sure that people with one or more protected
characteristics have equal opportunity to access the services we provide as those
who do not share a protected characteristic. 
Community Engagement
We have developed and published a Community Engagement Framework. This Framework
is a resource for staff and elected members and gathers in one place
• information on methods of engagement
• tools to engage
• the case studies and contacts to assist with supporting engagement to be relevant
and inclusive. 
Development of the Framework was led by the council’s Engagement and Communities Lead
and included a review of best practice for engagement frameworks nationally, alongside
engagement with officers through the council’s Community Engagement Strategy Group,
staff consultation, focus groups and senior management meetings of Council and HSCP.
The resource is supplemented by a course on community engagement. This is hosted on
LEON and is aimed at officers who are new to community engagement activity.
As part of the wider work around community engagement and improvements relating to how
we gather information, we have produced guidance around how to ask equality questions
along with a template of questions which can be used as is or amended to suit specific
circumstances. Expectations around consultation and engagement are set out in our impact
assessment guidance.
Work around enhancing community engagement, including how to reach harder to reach
groups, will continue across the next mainstreaming period.
Bringing officers together in the council’s Community Engagement group, it has highlighted
work around:
• Youth Voice
• Tackling Rural Poverty
In turn, this has opened up wider opportunities for engagement with children and young
people and people with lived experience of rural poverty.
We are grateful to these groups for their engagement with us and helping to ensure we can
capture the interests and views of an increasingly diverse range of people and interest
groups.
See also section 1.9. 
Page 107

Page 108

Outcome: We do not tolerate bullying and harassment of people from protected
groups 
Duty: Foster good relations; eliminate discrimination 
Protected characteristics: All 
Purpose: As part of wider work to tackle bullying in schools, we will take action to
reduce bullying on the basis of one or more of the protected characteristics. 
Education’s Anti-Bullying Policy is available online. Education has scheduled a review the
policy; this is captured in the actions to support the delivery of our new Outcome 5: Our
communities are safe for, and welcoming to, people with protected characteristics. (See
below.)
The council has made all HR policies available online on the MyCouncil Works website. This
means all staff, including non-networked staff, can access information and resources so long
as they have an internet connection.
Among the HR pages is one about Bullying and Harrassment. This provides information
about the council’s zero tolerance approach to bullying, how to raise concerns, how to access
support, and links to policies and procedures, and the Employee Assistance Programme. 
Outcome: The gap in educational attainment between people with and without
protected characteristics is reduced. 
Duty: Advance equality of opportunity 
Protected characteristics: All 
Purpose: We work to provide a high standard of education to all pupils, and we want
to reduce gaps in attainment between people with, and without, protected
characteristics. This will help us to advance equality of opportunity for young people
who share one or more of the protected characteristics. 
Education monitors attainment gaps relating to deprivation, gender, care experience, and
refugees. The continued monitoring of these attainment gaps is reflected in an action deliver
on our new Outcome 5: We ensure people with protected characteristics are enabled to
progress. (See below.)
Education has a number of measures in place to support the closure of attainment gaps.
These include the following. 
The Exchange provides a counselling service for all young people in education settings from
the age of 10.  In addition, KOOTH provides an online service.  Both services are promoted
across education settings and are signposted within the Health and Wellbeing Drama
performance You Are Not Alone which is delivered to S2 pupils.  
Mental Health and wellbeing of pupils is monitored through the Glasgow Wellbeing &
Motivation Profiling Tool, Planet Youth, and School Climate Survey.
Page 108

Page 109

Our care experienced children and young people tell us that they wanted to be ‘treated the
same’ as those who are not care experienced.  We are mindful of this as we aim to meet
their needs, often with a requirement for significantly greater support. 
We have a range of discreet systems in place to ensure we can provide opportunities for our
care experienced children and young people.  This includes financial, wellbeing, academic,
transition, and post school destination support.  For example, if a school is finding it difficult
to secure a work placement for a young person, we will meet with partners to explore
opportunities.  This can help ensure the correct level of support and relational approach is in
place, increasing the chance of success and achievement for the young person.   Destination
data in 2022-23, shows 86.4% of our care experienced children and young people went into
an initial positive destination.  This increased to 97% in session 2023-24.  
A bespoke data sharing agreement ensures we can support cross authority transitions to
ensure our care experienced children and young people have continuity of support and a
well-planned transition wherever possible. 
Also see above (People with protected characteristics have improved experiences of
services). 
Section 4: Equality Outcomes (2025-2029)
4.1 Developing our new outcomes
In drafting proposed outcomes prior to public consultation, we:
• Looked at the council’s priorities.
• Considered existing areas of activity with which links can be made.
• Horizon scanned changes happening outwith the organisation.
• Consulted internally with officers in relation to Education, Violence Against Women,
Refugees, and workforce-related activities. We have also presented papers with the
proposed outcomes to the council’s Departmental Management Teams, requesting input
from other Services.
• Discussed the development of equality outcomes at the UNCRC Incorporation Working
Group and the Equality Forum. 
• Made a presentation to the CPP Management Committee about our proposed equality
outcomes.
The public consultation was published on the council’s website and publicised through the
council’s weekly ‘Argyll and Bute News Round Up’ email. In addition, organisations known to the
Community Development team were emailed to promote the consultation with the intent to
reach community groups working with individuals who have one or more of the nine protected
characteristics.
The public consultation ran from 23 November 2024 to 10 January 2025. In total, 24 responses
were received in response to the public consultation, twenty from individuals and four from
organisations. Broadly speaking, responses were supportive of the proposed outcomes. See
table 1. 
Table 1: Numbers of respondents agreeing or disagreeing to proposed equality
outcomes
Page 109

Page 110

Proposed outcome Agree Disagree No response
1. We make access to information and services for
people with protected characteristics 21 3 0
2. Our communities are safe for, and welcoming to,
people with protected characteristics
22 2 0
3. We raise awareness of issues and challenges
faced with people with protected characteristics
along with ways to overcome them. 20 3 1
4. Argyll and Bute is a welcoming place for New
Scots to come and settle in. 19 3 2
5. We ensure people with protected characteristics
are enabled to progress. 22 2 0
6. Our work relating to equalities and people with
protected characteristics is coordinated across the
organisation and strategically aligned. 22 2 0 
We received some suggestions for wording of the outcomes. Limited changes to wording were
made in light of these.
Several responses to the public consultation raised concerns that reference to protected
characteristics in the outcomes was too limiting and that actions should extend to groups who
experience serious deprivation and poverty. However, the wording of the equality outcomes,
and specific reference to protected characteristics has been retained because this reflects the
requirements of the PSED. Equality outcomes are not delivered as an alternative to work the
council already does to address issues relating to deprivation and poverty.
Responses reflecting both sides of the trans debate were received in the course of this
consultation.
Two responses disagreed with all the equality outcomes. One of these was on the basis that
making things ‘easier’ for people with protected characteristics will build resentment between
them and other groups because this was not seen as equality. The other was on the basis that
the outcomes rely too heavily on third sector organisations for their delivery and these are not
council led. We disagree on both counts.
The Equality Outcomes for the period 2025 to 2029 were approved by the council’s Policy
and Resources Committee on 20 February 2025 and the Licensing Board on 22 April 2025.
The new outcomes are as follows:
1. We make access to information and services easier for people with protected
characteristics.
2. Our communities are safe for, and welcoming to, people with protected
characteristics.
3. We raise awareness of issues and challenges faced by people with protected
characteristics along with ways to accommodate and support them.
4. Argyll and Bute welcomes New Scots and supports them.
5. We ensure people with protected characteristics are enabled to progress.
Page 110

Page 111

6. Our work relating to equalities and people with protected characteristics is
coordinated across the organisation and its partners and is strategically aligned.
In conjunction with these outcomes, we have developed an action plan for their delivery. 
See section 4.2. 
4.1  Argyll and Bute’s Outcomes (2025-2029) 
Outcome 1: We make access to information and services easier for people with
protected characteristics. 
• Relates to our duties to: Advance equality of opportunity; foster good relations.
• Relates to: All protected characteristics. 
Rationale:
This outcome reflects the following considerations:
• Scottish Government has talked for several years about encouraging inclusive
communications.
• UNCRC incorporation includes a requirement to produce child-friendly documents; we
wish to develop an environment within the organisation which supports the creation of
these documents. Work around the UNCRC is referenced in the council’s priorities.
• Accessibility links with other activities including the Council’s BSL plan and website
accessibility.
• Accessibility links with wider good practice (including the production of easy read
documents). 
Outcome 2: Our communities are safe for, and welcoming to, people with protected
characteristics.
• Relates to our duties to: Advance equality of opportunity, foster good relations.
• Relates to all protected characteristics. 
Rationale:
This outcome:
• Serves as an umbrella for a range of activities being carried out by the council and the
Education authority.
• Enables people to have access to safer spaces. Safer may refer to the physical
environment or to community safety.
• Encompasses work being carried out by the Violence Against Women Partnership
around Violence Against Women and the Equally Safe Plan. 
• Ties into work Education does around bullying. 
Outcome 3: We raise awareness of issues and challenges faced by people with protected
characteristics along with ways to accommodate and support them.
Page 111

Page 112

• Relates to our duty to: Foster good relations; advance equality of opportunity.
• Relates to all protected characteristics. 
Rationale:
This outcome:
• Keeps equalities and issues arising around protected characteristics on people’s radar.
• Ties in with ‘fosters good relations’.
• Reduces organisational risk by ensuring equalities-related issues are better understood.
• Makes explicit our support for groups which may find themselves feeling vulnerable in
the current global climate. 
Outcome 4: Argyll and Bute welcomes New Scots and supports them.
• Relates to our duty to: Foster good relations; advance equality of opportunity.
• Relates to all protected characteristics with particular focus on ethnicity. 
Rationale:
• Work with refugees has been picked up by the Council’s administration as one of its
priorities
• This outcome ties in with Scottish Government’s New Scots Refugee Integration
Strategy 
Outcome 5: We ensure people with protected characteristics are enabled to progress.
• Relates to our duty to: Foster good relations; advance equality of opportunity.
• Relates to all protected characteristics with particular focus on ethnicity. 
Rationale:
This outcome relates to:
• Closing gaps between different groups, for example around educational attainment.
• Creating closer links with workforce planning activities.
• Increasing opportunities for those with protected characteristics to their fulfil potential. 
Outcome 6: Our work relating to equalities and people with protected characteristics is
coordinated across the organisation and its partners and is strategically aligned.
• Relates to our duty to: advance equality of opportunity.
• Relates to all protected characteristics. 
Rationale:
This outcome focuses on how we do things and what could be done better, rather than what we
do. We do a lot of good work around equalities and disadvantaged groups, but these are not
always linked together. It will:
• Ensure more consistent practice within the organisation.
Page 112

Page 113

• Ensure joined up practice, tying into the idea of ‘themes not teams’.
• Ties into wider Community Engagement work.
• Ties into wider work around data and evidence-based decision making. 
4.2 Equality Action Plan (2025-2029)
We have developed an action plan to support the delivery of the Equality Outcomes (2025-
2029) and will monitor it regularly for performance and compliance. 
Section 5: Workforce Monitoring and Reporting
Our detailed workforce reporting has been published separately. (Appendix One:
Workforce as of years ending 31 March 2023 and 2024.) 
Page 113

Page 114

6.0  Policy Statement with regard to Equal Pay:  
Argyll and Bute Council is committed to the principle of equal opportunities in
employment to ensure that employees are not discriminated against irrespective of
their age, race, disability, sexual orientation, gender, gender re-assignment,
marriage/civil partnership, pregnancy, maternity, religion or belief.
Argyll and Bute Council is committed to ensuring that all staff, irrespective of gender
should receive equal pay for the same or broadly similar work, for work rated as
equivalent and for work of equal value.
The Council’s equal pay objectives are to:
• Eliminate any unfair, unjust or unlawful practices that impact on pay;
• Take appropriate action to address these accordingly;
• Regularly monitor and review the application of policies and procedures
and;
• Conduct an equal pay review to monitor existing pay practices in line with
the Equality and Human Rights Commission’s Equal Pay Statutory Code
of Practice. 
In order to achieve equal pay for employees, the Council operates a pay system
which is transparent, based on clear criteria and free from unlawful bias through the
application of the nationally agreed job evaluation scheme and relevant legislation.
For Teachers the Council complies with nationally agreed pay and conditions of
service.
Argyll and Bute Council is committed to ensuring equal pay structures for all its
employees and will:
• Conduct regular audits to monitor the impact of its pay structure.
• Provide training and guidance for those involved in determining pay.
• Respond to grievances on equal pay in accordance with the council's
Grievance Policy.
• Work in partnership with recognised trade unions to ensure that the
Council provides equal pay.
• Review progress every 4 years.
Page 114

Page 115

ARGYLL AND BUTE COUNCIL    POLICY AND RESOURCES COMMITTEE  
8 MAY 2025
JOINT REPORT BY CUSTOMER SUPPORT SERVICES AND FINANCIAL
SERVICES
ITRENT HR AND PAYROLL SYSTEMS REPLACEMENT PROJECT UPDATE
1.0 EXECUTIVE SUMMARY
1.1 The purpose of this report is to update Policy and Resources Committee on
the major new HR and Payroll system implementation, to highlight what has
been delivered so far and request additional funding to complete the final
elements of the project.
1.2 The Policy and Resources Committee agreed to support the HR and Payroll
system replacement project in 2021, with funding approved for this purpose.
The previous system was about to become obsolete. MHR/iTrent were the
successful bidders and a project team and project board were put in place to
oversee the implementation of the new system. 
1.3 This paper highlights the successes in the installation of this new system to
date, along with a number of challenges that emerged post implementation,
which have caused some delays to completing the final elements of system
installation and realisation of the full expected outcomes. These final elements
will result in greater efficiencies and accuracy in our people management
processes. 
1.4 The Policy and Resources Committee is requested to approve:
a) The continued development and implementation of the remaining
elements of the iTrent project (Phase 2), in order to maximise the
benefits from its investment, as outlined in the original business case;
and
b) Additional budget resources of £480k for 2025/26, to be funded from
the partial release of an earmarked reserve balance, previously
earmarked to create a general provision for future redundancy costs.
Page 115 Agenda Item 10

Page 116

ARGYLL AND BUTE COUNCIL    POLICY AND RESOURCES COMMITTEE
8 MAY 2025
JOINT REPORT BY CUSTOMER SUPPORT SERVICES AND FINANCIAL
SERVICES       
ITRENT HR AND PAYROLL SYSTEMS REPLACEMENT PROJECT UPDATE
2.0 INTRODUCTION
2.1 In 2021, the council approved the replacement of its core HR & payroll
software application, Resourcelink with MHR iTrent. This decision was taken
following approval of the associated Business Case by SMT, the agreement
to allocate funding and the selection of a preferred provider via a competitive
procurement process. This resulted in the award of a 5 year contract to MHR
iTrent, commencing 1 January 2023.
2.2 A multi-disciplinary project team was established to deliver the successful
implementation of the replacement system.  The system comprises a number of
modules and phased implementation saw the first modules go live in August
2024, with the new payroll module delivering the August pay for teachers. 
2.3 A number of challenges have been encountered post implementation.  These
predominantly relate to issues associated with the functionality of the payroll
module.  Unfortunately, these issues were unforeseen and therefore not
provided for within the original project timescale and approved resources.
2.4 A project remediation plan for the resolution of key issues is now in place and
resources have been allocated to develop and manage delivery of agreed
remedial actions.  A risk based approach has been taken to the deployment of
resources and it has been necessary to prioritise this remedial work over the
continued development and implementation of remaining modules, fundamental
to delivery of the wider objectives outlined in the business case.  
2.5 It will not be possible to fully deliver the iTrent project objectives within
approved project resources.  As such, a cost benefit analysis of potential
options has been undertaken in order to inform recommended next steps.
Page 116

Page 117

2.6 The purpose of this report is to set out the original iTrent project objectives,
provide and update on progress and challenges to date, and bring forward
recommended next steps, based on an options appraisal.
3.0 RECOMMENDATIONS
3.1 The Policy and Resources Committee is requested to approve:
a) The continued development and implementation of the remaining
elements of the iTrent project (Phase 2), in order to maximise the
benefits from its investment, as outlined in the original business case;
and
b) Additional budget resources of £480k for 2025/26, to be funded from
the partial release of an earmarked reserve balance, previously
earmarked to create a general provision for future redundancy costs.
4.0 DETAIL
4.1 Project Objectives and Vision
4.1.1 A copy of the Business Case Executive Summary is given within Appendix 1
for information. The key driver for the business case was that Resourcelink
was not fit for purpose to deliver on the council’s digital, transformational
agenda and the system was reaching end of life. The business case set out
the need to procure and implement an HR and payroll system that would
deliver:
• An effective and efficient way of paying staff.
• Efficient and effective storing, processing and reporting on employee data.
• An intuitive user interface to manage the employment relationship
efficiently and effectively.
4.1.2 The specific business and project objectives comprised the following:
• Demonstrate management of the entire HR & Payroll journey from recruit
to retire.
• Ensure seamless integration with data platforms and reduce
administrative workload through intuitive design.
• Centralise employee information and reduce duplication of data across
multiple systems.
• Achieve improved reporting, creating a single, reliable source of truth for
all stakeholders.
• Successful configuration, testing, and live implementation of iTrent.
• Development of necessary interfaces to external and council systems.
• Effective training for HR, Payroll, and ICT teams to manage the system
and its processes.
Page 117

Page 118

• Proper decommissioning of legacy systems and a strong data
management approach.
4.1.3 The vision for the project was not to simply implement new software, but to
review our current practices and processes in the design of each module,
ensuring what was built was an automated and intuitive user experience,
reflective of modern HR and Payroll best practice and in line with the Council’s
digital and transformation agendas.
4.2 Project Governance
4.2.1 A multi-disciplinary project team was established to deliver project design,
development and implementation, with representation from Payroll, HR
Operations and Systems Development; and input from professional ICT,
Finance and Procurement support services. This aimed to ensure that
knowledge of the new system would be embedded within existing staff. 
4.2.2 A Project Board was established to oversee project delivery, with the Head of
Customer Services as SRO. The Board comprised senior managers from HR
and Financial Services, in addition to the project team, supported by ICT and
procurement colleagues. The Board has met regularly since the project
inception and continues to monitor and review project management
information.
4.2.3 The Board has put in place a post implementation remediation workplan, as
advised by ELT, to ensure satisfactory resolution of a number of critical issues
arising from the implementation of the payroll module.  This workplan
continues to be closely monitored with regular progress updates provided to
the ELT.  It has also been necessary for the Board to agree the redirection of
resources from the continued development and implementation of further
modules to the remediation of priority issues. These priority actions were
essential and had to be undertaken immediately to configure functionality to
ensure the pay awards were implemented before Christmas and all
employees received their back pay in addition to ensuring that the payruns
can run each month.  The other critical items relate to costings and the
accounts, pension returns and timesheets. These were prioritised by ELT
pending the development of an options appraisal on next steps.
4.3 Progress To Date
4.3.1 The initial phase of project implementation progressed broadly to plan.
Resourcelink was safely decommissioned, with all data removed by the
contract end date of 28 September 2024.  The new payroll module went live
for teachers in July 2024 and SLGE employees in August 2024.
4.3.2 Specific deliverables comprised the following:
• Configuration and installation of the new software, with all security checks
completed.
• All employee data transferred, and multiple, complex work patterns
installed.
Page 118

Page 119

• Installation of all pay rates, pension and NI rates; leave entitlements; and
post hierarchies.
• Front end of HROnline configured, tailored to Argyll and Bute Council, with
images and key tasks easily accessible creating a user-friendly interface.
• Structure Chart prepared and installed, which had been unavailable in
Resourcelink.
• Secure Single Sign On for all networked staff and Multi Factor
Authentication for all non-networked staff configured and enabled.
• Absence recording and return to work notifications to managers configured
and enabled.
• Temporary contract extensions designed, configured and enabled for self
service.
• Travel and Expenses, New starts and Visa process designed, configured
and enabled.
• Training and guidance for employees developed and delivered, with FAQs
also provided online and through HR Service Centre.
• All legacy data safely removed from Resourcelink and stored in a secure
manner, accessible for reporting.
• All key reports created in Business Objects to schedule.
• Design and configuration of elements of case management and
recruitment.
4.4 Key Challenges
4.4.1 It became clear at the early stages of the project that the system as purchased
was not an ‘off the shelf’ product but a basic set up that required much more
significant design, build and configuration by the in-house team than had been
anticipated. This meant that the team had to amend their detailed plans to re-
allocate time for build. This then had a knock-on impact on the capacity
available in the project team to carry out testing on the system once configured.
The project was working to the hard end date of the Resourcelink contract, so
there were tight timescales to meet. Testing was not therefore fully carried out
for all of the modules that were installed.
4.4.2 In the early stages of the project, it was not possible to re-direct existing payroll
staff from business as usual activities to the project, to the extent initially
planned.  Additional resources were secured, albeit with limited knowledge of
local payroll processes, however, overall available project resources were
insufficient and this impeded progress on payroll specific as well as HR
workstreams. Attempts to recruit a suitably qualified and experienced Payroll
Professional to lead the Payroll Workstream were unsuccessful.  This
compounded the issue of sufficient time to carry out testing of essential
payroll processes on the new system was limited.  
4.4.3 Subsequent to configuration of the new iTrent system, the project team
embarked on an intensive period of dual running, with iTrent operating in a
test environment and Resourcelink continuing to operate in the live
environment, prior to going live with iTrent. This dual running was anticipated
to be required for 2 months, however, a significant number of unresolved
Page 119

Page 120

discrepancies and errors between the two systems required this period to be
extended to 5 months.  The Project Team sought to diagnose and resolve as
many errors as possible during dual running before going live with iTrent,
which necessitated the redirection of project team and support resources from
other workstreams to basic payroll support.  As such, these other
workstreams, which had been planned for, are currently part developed, but
as yet incomplete. 
4.4.4 Ultimately, with a hard deadline for Resourcelink to be decommissioned by 28
September 2024, the decision was taken to go live with iTrent for Teachers in
July 2024 and SLGE staff in August 2024.
4.4.5 From go live, whilst the majority of regular, salaried staff have been paid
accurately and on time since August, and are using the self-service HROnline
system, there continued to be high volumes of errors and ELT was advised in
November 2024 that there were significant issues with the following:
• Absence – the system is not calculating entitlements reliably, as currently
configured, resulting in additional checking and manual intervention. The
team is working with iTrent consultants to reconfigure and maximise
automation and accuracy.
• Pensions – the monthly i-Connect extract from the system had not been
configured leading to delays in the submission of data to the LGPS
administrators.  There is an external deadline of 31 May for submission of
2024-25 pensions data to the Strathclyde Pension Fund. The team are
currently on track to complete the work to meet this date.
• Costings – the costing extracts from iTrent do not meet our accounting
requirements and this has consumed additional resources through manual
intervention, and delayed processing. Work on the system has been
carried out and this will be complete and fit for purpose in April, before the
Annual Accounts are submitted.
• Pay Award – additional consultancy support and a significant level of
manual calculations were required to ensure implementation of the new
2024/25 pay rates and arrears of pay to all staff by Christmas 2024. This
was successfully delivered on time.
• Timesheets – the functionality available for entering timesheets into iTrent
as configured is poor, using our current practice.  This has created
significant issues for both staff entering data, and for Payroll and Project
Team resources, with additional resources consumed in providing support
to users and correcting input errors. An options appraisal to improve this
position is currently being developed to maximise use of the system’s
opportunities for automated uploads and input.
4.4.6 The post-implementation issues have resulted in employees across Payroll,
HROD and Systems Development prioritising and spending significantly more
of their time than should be necessary on manual processing and diagnosing
individual pay issues.  This has resulted in resource being diverted from the
planned programme to complete all the planned system improvements.  
Page 120

Page 121

4.4.7 The Executive Leadership Team has requested a report on lessons learned
and officers will report back on this in due course.  It is expected that lessons
learned may be considered and incorporated into operational arrangements
for future major projects, to ensure continuous improvement.
4.5 Outstanding Project Deliverables
4.5.1 The Council has been recognised by the Accounts Commission as having a
good track record in delivering on transformation and is considered to be ‘ahead
of the game in achieving efficiencies, including through its use of digital
technology’. This project, whilst having encountered some challenges in its initial
implementation stages, is a clear example of the Council building on what the
Accounts Commission identified as our culture of innovation by configuring a
forward-looking, multi- functional, automated system. 
4.5.2 Once complete, the new system will be an important tool in our transformational
journey, creating efficiencies for our employees and managers, having a positive
impact on our reputation as an employer of choice and our ability to recruit and
retain staff. It will also ensure that our processes are better designed, better
adhered to and more efficient for managers and employees, leading ultimately
to fewer grievances and disciplinaries. 
4.5.3 Due to the above mentioned, post-implementation issues with the system, a
number of key project elements that were planned have not yet been delivered.
These are all included in our contract price, so we are already paying for this
functionality. These workstreams have already been worked on by the project
team in preparation for final configuration and delivery. They were paused to
divert project resources to enable the post implementation remediation work on
the issues set out above to take place. 
4.5.4 These are all system benefits that add value, improve automation, workforce
reporting, employee experience and manager efficiency. The modules that have
not yet been delivered comprise the following:
A. Recruitment and Onboarding
This part of the system will allow us to have an automated end to end process
for all new starts to the organisation, improving new employee experience
from seeing a job advert to starting on their first day with the Council. This will
improve both our reputation as an employer and will reduce administrative
work for managers who are recruiting new staff. 
• We intend to continue using MyJobScotland as our main recruitment site
but will substitute Talentlink (the manual input system managed by
COSLA) with an automated feed from MHR iTrent.
• The pre implementation survey showed managers spend between 3 and 7
hours of their time per vacancy using Talentlink. In 2024 the council
advertised a total of 1,212 vacancies (excluding casuals). This means we
can expect between 3,636 and 8,484 hours of management time were
used for completing tasks associated with recruitment i.e. a management
Page 121

Page 122

time cost to the organisation of around 2-3 FTE for recruitment. The recent
employee survey showed managers among the highest proportion of the
workforce reporting they frequently have too much to do, citing HR,
procurement and other corporate processes as taking too much of their
time.
• New employees will benefit from a smooth, end to end experience starting
with their application form, through to their contract being issued and their
induction being carried out.
• This interface will allow us to improve efficiency in reporting on recruitment
and retention issues to help address workforce planning challenges
• We will continue to need resource in HR service centre so there is limited
opportunity to reduce back-office resource requirements
• Discussions are still in progress with COSLA, iTrent and other Council to
configure this.
B. Time and Attendance
• We aim to use the module available in iTrent to replace the current Crown
contract (£10K per annum) for MyOptions This module is included in our
iTrent contract price. This will allow us to automate leave management,
support associated payroll calculations (unpaid absence and leavers) and
improve data analytics on different types of leave. This is important
workforce information in the context of increasing sickness absence trends
across the public sector.
• This will enable  all annual leave to be recorded in one system for
management of leave and absence, automatically calculate leave
entitlement for leavers.
C. Case Management
The Iken system, which was being used for Employee Relations case
management, was discontinued on the assumption that iTrent case
management would be implemented. The HR Operations team have therefore
had to revert to fully manual case management process. This is currently
causing resource pressures for the Employee Relations team who are dealing
with increased volume and complexity of case load alongside a manual
tracking system. Last year recorded the highest number of disciplinaries since
before COVID, almost double compared to year before, which presents us
with an increased level of risk as the employer. Implementing this module will
offset the need for additional staffing cost, improve efficiency and mitigate that
risk.
Implementing Case Management will deliver:
• All employee case data will be stored securely in one place and accessible
by all HR advisors making it easier to understand the stage/advice thus far
and easier for all stakeholders to pick up on compliance issues/overdue
stages/ timescales. It also reduces the risk of paperwork being
misplaced/filed. It will automatically produce a case timeline of actions
Page 122

Page 123

completed by those involved important for dismissal meetings, appeals and
tribunals.  
• Automated email reminders to managers or officers involved will remind
them to progress to the next stage/highlight if actions are overdue,
supporting cases to be handled consistently and according to our
procedures therefore reducing risk and increasing compliance.
• As all stakeholders in cases will have access to their cases in the module,
this will allow better collaboration between HR advisors and line managers
or lead managers allowing advice to be recorded and information shared
regarding the progression of the case and reasons for delays.
• With all information in one place more detailed reports on case trends,
service performance and outcomes will be available ensuring a data driven
approach for decision making and proactive interventions.
• Dashboards will allow senior HR and service managers to review the cases
and their progress across their area of responsibility.
• Automatic generation and saving of correspondence within the case
management system will save time for managers and officers involved in
the administration of these processes and ensure paperwork does not go
missing.
• Manual recording, reporting and reminders will no longer be used,
improving overall effectiveness and compliance.
• Managers will save time when dealing with cases.
4.6 Financial Position
4.6.1 Reserves totalling £332k were earmarked to meet project costs associated
with the development and implementation of the iTrent solution.  The actual
project expenditure incurred during 2024-25 is expected to be managed within
available budget resources.  However, due to the challenges outlined in
Section 4 and the required redirection of resources to remediation activities,
the earmarked reserve balance will require to be fully drawn down in 2024-25,
with no residual resource available to meet the cost of delivering the
remaining elements of the project.
4.6.2 It is currently estimated that additional resources of £480k will be required to
complete the payroll remediation plan (circa. £155k); and implement the
remaining elements of the project (circa. £325k), to fully deliver the expected
project outcomes, in line with approved business and project objectives.  This
comprises additional costs for consultancy (£56k) and staffing (£424k), with a
continued requirement for temporary specialist staff and backfill for key posts
in the Payroll, HROD and Systems Development Teams. 
4.6.3 The profile of required project staffing over 2025-26 to complete both payroll
remediation and to deliver the remaining elements of the project is outlined in
the table below.  The remediation of post implementation payroll issues is
expected to be substantially completed by 30 June 2025 (Quarter 1), with
delivery of the remaining project elements targeted for completion by 31
March 2026. 
Page 123

Page 124

Team Q1 Q2 Q3 Q4
DEV Team 4.88 4.88 2.38 2.38
HR 4.40 4.40 4.26 1.76
Payroll 6.35 0.00 0.00 0.00
Total 15.63 9.28 6.64 4.14
4.6.4 It has been necessary to enter into commitments during 2024-25, to support
delivery of the business critical remedial activities in respect of payroll.  These
commitments extend into 2025-26, with additional unbudgeted expenditure of
circa. £75k incurred during 2025-26 to date (8 May 2025).
4.6.5 A review of earmarked reserve balances has been undertaken, in order to
highlight potential opportunities to re-prioritise the use of existing resources, in
line with the council’s Transformation agenda and longer term financial planning.
Previous prudent decisions have allowed for a substantial general provision for
future redundancy costs.  However, at this stage, this is not underpinned by
detailed planning assumptions.  As such, it is proposed to release £480k of this
balance for the redirection of resources to delivery of the remaining elements of
the iTrent project, in line with original project objectives and as part of our
Transformation agenda.  It is intended to the review the level of the redundancy
earmarked reserve, as part of our five year budget approach, with any
recommendations in this respect brought back to committee at a future date.   
4.7 Cost Benefit Analysis
4.7.1 Given the requirement for additional resources to complete the project, in line
with the original specification, it is deemed appropriate to undertake a cost
benefit analysis, in order to inform next steps.  As such, a cost benefit analysis
was undertaken in respect of 5 identified potential options, as outlined below. 
Description
Option 1 Conclude project immediately post payroll remediation
Option 2 Procure alternative new system
Option 3 Outsource Payroll/HR Services
Option 4 Purchase Shared Services (OLA provider)
Option 5 Deliver existing project specification (Phase 2)
4.7.2 While it has not been possible to provide fully reliable cost estimates for each
option, the analysis outlines key considerations, providing a rationale for the
ranking of each option in terms of both costs and benefits. Key considerations
for each option are outlined within Appendix 2.
4.7.3 Each of the 5 options have been evaluated on both costs and benefits, based
on the considerations outlined above. A score between 1 and 5 has been
Page 124

Page 125

assigned to both costs and benefits, where 1 represents highest cost/lowest
benefit and 5 lowest cost/highest benefit. Options have been ranked 1 to 5
based on an overall score, where 1 represents the best option.  The outcome
of this evaluation is summarised in the following table. 
Option
Cost 
Score
1 Highest –
5 Lowest
(A)
Benefits
Score
1 Lowest –
5 Highest
(B)
Overall
Score
(A)x(B)
Rank
1 Best –
5 Worst
1 Conclude project
immediately post
payroll remediation
5 3 15 2
2 Procure alternative
new system 1 4 4 4
3 Outsource Payroll/HR
Services 3= 1 3 5
4 Purchase Shared
Services (OLA
provider)
3= 2 6 3
5 Deliver existing project
specification - Phase 2 4 5 20 1
4.7.4 The option that ranks most highly based on the above evaluation is for the
council to seek to progress the development and implementation of the
remaining elements of the iTrent project (Phase 2), in order to maximise the
benefits from its investment, as outlined in the original business case, subject
to affordability.
5.0 CONCLUSION
5.1 A number of benefits have been delivered to date, with a remedial action plan in
place to resolve a number of unforeseen post implementation issues. Remedial
work has required the redirection of resources and the available project budget
has now been fully spent.  
5.2 There is an opportunity to deliver further benefits, in line with the original project
objectives.  The continued development and implementation of the remaining
project elements, at an additional cost, is deemed to deliver best value to the
council and its employees, as evidenced by the cost benefit analysis.
6.0 IMPLICATIONS
6.1 Policy – There are no policy implications from this report.
Page 125

Page 126

6.2 Financial – Additional resources of £480k required, to be met from earmarked
reserves.
6.3 Legal – None.
6.4 HR – The final completion of the iTrent project will improve employee and
manager experience and efficiency through a fully automate online HR/Payroll
system.
6.5 Integrated Impact Assessment - An Integrated Impact Assessment has been
undertaken and found to have positive impacts.
6.6 Climate Change – Greater levels of automation, reduction of duplication and
reduction in emails general will reduce the energy required for processing. 
6.7 Risk – An effective HR and Payroll system that maximises automation of pay
and contractual processes will serve to reduce financial, audit and reputational
risks. 
6.8 Customer Service – The full implementation of the new system will result in
improved experience for all employees, managers, starters and leavers
through user friendly, automated processes. 
6.9 The Rights of the Child (UNCRC) – None.
Kirsty Flanagan
Executive Director with responsibility for Customer Support Services and
Financial Services 
03 April 2025
Councillor Mark Irvine, Policy Lead for Customer Support Services
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services
For further information contact: 
Jane Fowler, Head of Customer Support Services
Jane.Fowler@argyll-bute.gov.uk
Carolyn Earl, Interim Head of Financial Services
Carolyn.Earl@argyll-bute.gov.uk
Page 126

Page 127

APPENDICES
Appendix 1 – Business Case Executive Summary
Appendix 2 – Cost Benefit Analysis Considerations
Page 127

Page 128

1 of 3 01/03/20
APPENDIX 1
HR and payroll systems replacement - summary of business case
1. Summary
The Council implemented its current core HR & payroll software application,
Resourcelink, over 20 years ago. A number of other systems support some specific
HR functions. 
For a number of reasons, set out in the attached business case and summarised
below, the core Resourcelink application and associated systems are no longer fit-
for-purpose for both the current and the future needs of the organisation. 
Additionally, support for the main Oracle EBS system used by Financial Services to
manage the General Ledger and Accounts Payable functions ends in December
2021.  For reasons of PSN and Cyber Essentials Plus compliance, and also broader
cyber-security protection of a business critical system the council depends on, it is
not practical for Finance to use this system beyond April 2022.  
The council therefore has an opportunity to look to consolidate the ICT systems for
both these services onto a single ERP (Enterprise Resource Planning) system which
could support the requirements for both in an integrated manner.  
2. Detail
The HR and payroll systems are not fit for purpose as they do not provide best value
in three areas – 
a) Effective and efficient way of paying staff -
• Resources currently available within the HROD team do not meet processing
demand.
• Some process automation has been implemented however the volume of
transactions has continued to increase due to the changing organisation
demographic.
• This has resulted in high volumes of payroll errors submitted by services
• Unplanned system downtime reduces further the processing time available to
the team.
b) Efficient and effective way of storing, processing and reporting on
employee data -
• Employee data is held across 6 systems. Most data transfer between them is
manual.
• Human error and duplication of data reduces the integrity of reporting.
• multiple log ins for different systems wastes time
c) Intuitive user interface to manage the employment relationship quickly and
effectively -
• Customers find the HR systems are not intuitive, and the automated
processes are time consuming and create more work for managers and staff.
• More errors occur, reducing satisfaction and damaging reputation
• Reporting is difficult to access and very limited
Page 128

Page 129

2 of 3 01/03/20
In 2019 the council published Requests for Market Information (RFIs) for the
replacement of Oracle EBS and ResourceLink.  Responses were received from a
range of suppliers, some on the basis of replacing just one of the two systems, but
others proposing a single solution to cover both Financial Services and HR/Payroll.
A significant commitment of human resource would be required from both services to
a project team working on the planning, implementation and testing of the solution
for a period of up to 2 years. 
3. Options
Option 1 - Do nothing – not viable as outlined above
Option 2 – Full procurement to replace Resourcelink and some associated systems
The responses to the RFI gave a very wide range of capital costs for replacing
Resourcelink, whose supplier Zellis declined to indicate any costs at all until a full
procurement is undertaken. A reasonable mid-point of capital costs across the
responses is £300,000, with similar annual revenue costs of £120,000, as at present.
Advantages - Exploring these solutions further in a full procurement would allow the
team to fully evaluate the products available, and also the possibilities of using
existing corporate workflow management tools such as the Oracle CRM for
managing HR functions, perhaps feeding into a separate payroll system that is part
of Finance’s solution.    
Disadvantages - May not provide as efficient results as a single integrated ERP
system.
Option 3 - Joint approach with Financial Services – single ERP solution
There could be significant benefits from implementing a single ERP system to
support the needs of both services.  These could include:
• Reduction in the duplication of data being held in multiple systems
• Improved reporting from a single information manage system representing a
“single source of truth” that both services can rely on.
• Improved data integration leading to faster, more efficient data processing
• The payroll function moving to finance in 2020 could increase efficiencies even
further
Advantages – allows Financial Services and HR/Payroll to fully investigate the
potential benefits of a single ERP solution.  Similar capital costs to Option 2.  
Disadvantages – likely involves an overall increase to on-going revenue costs.  One
supplier (Technology One) responded to the RFI with total revenue costs of
£106,700 pa for both Finance and HR, but the other three ERP providers fall into a
much higher price bracket:
Oracle Cloud approx. £495,000 pa
approx. £505,414 pa
Page 129

Page 130

3 of 3 01/03/20
Edenhouse (SAP
Reseller)
Unit 4
approx. £550,000 pa
It is hoped that these increased revenue costs will be offset to some extent by
operational savings achieved from the closer integration of Finance and HR
processes and procedures.
4. Recommendation
The preferred approach is to initially coordinate the replacement of Resourcelink with
the EBS replacement. On that basis the business case recommends developing
option 3, with the caveat that if after investigation of the ERP approach the cost-to-
benefit ratio is unfavourable, an HR/payroll solution would be pursued as outlined in
option 2. 
SMT is asked to endorse the ICT Steering Board’s decision to approve the following
ICT capital allocation, and to consider how the staff back-fill and additional revenue
costs will be met:
• £300,000 ICT capital to allow the procurement of the replacement of
Resourcelink and related  systems supporting HR functions;
• Temporary resource within HR and payroll to be backfilled for the duration of
the implementation project, from July 2020 to April 2022, at a cost of
approximately £100,000.
Page 130

Page 131

1
APPENDIX 2
iTrent HR and Payroll Systems Replacement Project
Options Appraisal - Cost Benefit Analysis Considerations
Option 1 Conclude project immediately post payroll remediation
Cost Implications Benefits Realisation 
(Business Case Expected Outcomes)
• Contractual commitments -  iTrent
annual license fees to December 2027
@ £115k p.a. (17 modules)
• Opportunity cost of software/systems
not decommissioned through
development/implementation of
residual iTrent modules: MyOptions
(Time and Attendance); Totara
(Learning and Development); and
Civica (Electronic Document
Management)
• Approved recurring future years
savings target not delivered
• Opportunity cost - Redirection of
resources (service managers) not
possible
• Opportunity cost – potential
restructuring savings (HR/Payroll)
• Sunk costs – UAT, systems
configuration, training etc incurred to
date, in respect of modules yet to be
implemented
• Basic payroll function operational
• Limited benefits realised to date,
however, not all modules
purchased have been
developed/implemented (those
remaining would be included as
Phase 2)
• Functions that were identified as
business benefits in the Business
Case and PID will not be
delivered (automation with
improvements in speed and
accuracy) and manual processing
will continue
• Benefits not realised in respect
of:
Recruitment and Onboarding;
Time and Attendance; and Case
Management
Page 131

Page 132

2
Option 2 Procure alternative new system
Cost Implications Benefits Realisation 
(Business Case Expected
Outcomes)
• Contractual commitments -  iTrent
annual license fees to December 2027
@ £115k p.a.
• Sunk costs – iTrent systems purchase,
project costs to date
• Additional purchase costs of
alternative system (2 other bids
evaluated, as part of original
procurement exercise, alongside iTrent
- both £500k higher costs over 5 year
period)
• Additional project costs of
procurement, development and
implementation of alternative (2 year
lead-in)
• Delayed realisation of savings
• Risk that existing software/systems
may not be fully decommissioned,
depending on new system
specification (iTrent modules,
MyOptions, Totara, Civica)
• Assume similar to full
development and
implementation of all iTrent
modules (Option 5), however,
element of uncertainty, as not
tested
Additional Risks:
• Reputational damage re ‘sunk
costs’
Page 132

Page 133

3
Option 3 Outsource Payroll/HR Services
Cost Implications Benefits Realisation 
(Business Case Expected
Outcomes)
• Contractual commitments -  iTrent
annual license fees to December 2027
@ £115k p.a. (17 modules)
• Sunk costs – iTrent systems purchase,
project costs to date
• There are companies in the market
offering payroll and elements of HR
services but not full suite – elements
would require to be delivered in-house
– likely to be more expensive overall
• Potential offsetting recurring savings
from redundant payroll/HR elements
• Potential redundancy costs
• Client function requires to be retained
• Potential additional costs to mitigate
increased data protection risk
• Additional recurring contract
management costs
• Basic payroll function
• Likely to be limited benefits
realised in respect of Business
Case expected outcomes
Additional Risks:
• Reputational risk around
potential redundancies
• TU engagement/agreement
required, potential TUPE
transfer
• Reputational damage re ‘sunk
costs’
• Research (limited) suggests
public bodies that have
outsourced payroll/HR,
subsequently brought back in-
house due to cost/quality
concerns
Option 4 Purchase Shared Services (OLA provider)
Cost Implications Benefits Realisation 
(Business Case Expected
Outcomes)
• Similar to Option 3, however, potential
future shared services model would be
expected to deliver savings
• Whilst an option in principle, in
practice, no proven market or reliable
cost estimate
• Similar to Option 3, however,
potential opportunity for a future
model, to realise benefits of
shared agreed outputs, service
specification etc, although likely
to be challenges, where
policies, terms and conditions
not aligned
Page 133

Page 134

4
Option 5 Deliver existing project specification (Phase 2)
Cost Implications Benefits Realisation 
(Business Case Expected
Outcomes)
• Additional non-recurring cost
estimated at £567k (prior to potential
mitigations) over 2 years 2024-26
• Potential additional cost mitigations
estimated at £199k (residual unfunded
£366k)
• Recurring future savings will provide
payback for additional investment
(extended period)
• Additional project costs could be
capitalised if more affordable
• Potential future opportunity to generate
additional income/reduce costs
through provision of payroll/HR
services to other local authorities
(shared services model)
• Full benefits realised, in line with
project expected outcomes, as
set out within original business
case
Page 134

Page 135

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE 
CUSTOMER SUPPORT SERVICES                                                   8 MAY 2025 
PROPOSED AMENDMENT TO THE AGE AT WHICH AN LPGS EMPLOYEE CAN
MAKE AN APPLICATION FOR FLEXIBLE RETIREMENT 
1.0 EXECUTIVE SUMMARY 
1.1  It is proposed the Council should amend its existing Flexible Retirement
Procedure to allow Scottish Local Government Employees (SLGE) aged 55 and
over with at least two years’ pension scheme membership to be able to make a
request for flexible retirement. 
1.2  In order to do this an amendment to the Council’s Pensions discretions policy for
Scottish Local Government Employees is required. It is recommended that
Policy and Resources Committee approves the proposal to amend the qualifying
age of flexible retirement to 55 and approve the changes to the Pensions
Discretion Policy to allow this to be implemented.   
RECOMMENDATIONS 
i. The Policy and Resources Committee approves the proposal to amend
the qualifying age to request flexible retirement to employees aged 55
and who have at least two years pension scheme membership.   
ii. The Policy and Resources Committee approve the amendment to the
Pensions Discretions Policy as outlined below to support the above
proposal if agreed. This will continue to allow for discretion to be applied
in exceptional circumstances in relation to the Council rather than the
employee accepting the actuarial strain. 
Page 135 Agenda Item 11

Page 136

ARGYLL AND BUTE COUNCIL     POLICY AND RESOURCES COMMITTEE 
CUSTOMER SUPPORT SERVICES                                                   8 MAY 2025 
PROPOSED AMENDMENT TO THE AGE AT WHICH AN LPGS EMPLOYEE CAN
MAKE AN APPLICATION FOR FLEXIBLE RETIREMENT 
2.0 INTRODUCTION 
2.1  Flexible Retirement enables the employee to access their pension benefits while
continuing to work, through either a reduction in working hours or grade.  An
employee of the approved age can request Flexible Retirement. The request
requires to be considered but does not require to be granted, it is at the
discretion of the Council as employer. 
2.2 The Council currently has a Flexible Retirement process for SLGE employees in
place that sets the qualifying age that someone can make a request to flexibly
retire at 60 years of age. The Local Government Pension Scheme (Scotland)
Regulations 2018 allows for this to be reduced to 55. Many local authorities
have set 55 years of age as the qualifying age for making a flexible retirement
request.  Teachers are covered by a separate pension scheme which includes
provisions for similar phased retirement arrangements commencing at age 55. 
2.3 To support succession planning it is proposed that the Council should amend its
existing Flexible Retirement Procedure to allow employees aged 55 and over
with at least two years’ pension scheme membership to be able to make a
request for flexible retirement.   
2.4 It is anticipated that in cases where there is any actuarial strain identified that the
employee who is choosing to flexibly retire will accept that strain cost and not the
Council. 
2.5 In exceptional cases (for example significant workforce planning risks) and only
in circumstances that are initiated by the employer, the discretions policy allows
for the Council to choose to accept the actuarial strain rather than the employee.
This would require scrutiny and sign off by an Executive Director. 
2.6 It is intended that once the revised flexible retirement procedure is signed off
that an effective communication strategy is adopted to ensure that all employees
are aware of the procedure.     
Page 136

Page 137

3.0 RECOMMENDATIONS 
3.1 The Policy and Resources Committee approves the proposal to amend the
qualifying age to request flexible retirement to employees aged 55 and who
have at least two years pension scheme membership.   
3.2 The Policy and Resources Committee approve the amendment to the Pensions
Discretions Policy as outlined below to support the above proposal if agreed.
This will continue to allow for discretion to be applied in exceptional
circumstances in relation to the Council rather than the employee accepting the
actuarial strain. 
Proposal that the following change be made to the wording in the Pensions
Discretions Policy. 
Amend this:
R29(7)* &
TP11(2) 
Whether all or some
benefits can be paid if an
employee reduces their
hours or grade prior to
age 60 (flexible
retirement)
Argyll & Bute Council may exercise this
discretion. Arrangements and eligibility
criteria are set out in the Council’s
Flexible Retirement Procedure 
To this:
R29(7)* &
TP11(2) 
Whether all or some
benefits can be paid if an
employee reduces their
hours or grade prior to
age 55 (flexible
retirement)
Argyll & Bute Council may exercise this
discretion. Arrangements and eligibility
criteria are set out in the Council’s
Flexible Retirement Procedure 
4.0 DETAIL 
4.1  It is proposed that the Council should amend its existing Flexible Retirement
Procedure to allow employees aged 55 and over with at least two years pension
scheme membership to apply for flexible retirement.  The current scheme allows
those over 60 to apply but the Local Government Pension Scheme (Scotland)
Regulations 2018 allowed this to be reduced to 55. There is a proposal that this
will rise to age 57 years from 6 April 2028 but the Scottish Government have not
yet confirmed this. 
If approved and while amending the age, we propose to put in place a more
user friendly and efficient process for employees wishing to explore flexible
retirement as a possibility. 
4.2   Flexible Retirement enables the employee to access their pension benefits
whilst continuing to work through either a reduction in working hours or grade. 
Page 137

Page 138

An employee of the approved age can request Flexible Retirement but the
request requires to be approved by the Council before it can be progressed. 
4.3  In our most recent Strategic Workforce Planning report, it was identified that like
other Local Authorities in Scotland, we have an ageing workforce with around
half of our employees being currently age 50 and over. 
Strategic Workforce Planning Priorities 2024-25 
The Council values the skills and knowledge of this demographic within our
workforce and the advantages to the council in reducing the age for flexible
retirement would be in the improved succession planning and scope to increase
growing our own activities. The advantages for the employee is that it can help
ease employees into retirement by giving them access to pension benefits and
to continue earning a salary. 
4.4 Reducing the age for Flexible Retirement may give more scope for creation of
trainee posts or sharing of duties in preparation for the future ensuring that
replacements can work alongside these employees sharing that skills and
experience in a structured way before they exit the organisation, and the Council
is left with a skills shortage or a labour shortfall. 
5.0 CONCLUSION 
5.1 That the Policy and Resources Committee agree to amend the qualifying age to
request flexible retirement from 60 to 55 but still allowing for discretion to accept
actuarial strain in exceptional circumstances. 
5.2      That following approval of the revised Flexible Retirement Guidance and the
revision of the qualifying age of flexible retirement by the Policy and Resources
Committee, that the revised Flexible Retirement Procedure be communicated to
employees in June 2025. 
6.0 IMPLICATIONS 
6.1  Policy:  Amendment to the Pensions Discretions Policy as
outlined above Pensions discretion policy | The Hub 
6.2  Financial:       There are no immediate financial implications as a
result of the amendment.  However, there will be a
reduction in the pension payments to the employee
should they accept an actuarial reduce pension or a
cost to the Council should it exercise its discretion to
waive this. 
6.3  Legal:  None – the policy meets statutory obligations. 
Page 138

Page 139

6.4  HR:  None – the application of the Flexible Retirement
Procedure is monitored by HR to ensure consistency of
approach. 
6.5  Fairer Scotland Duty: 
6.5.1 Equalities – Protected Characteristics 
6.5.2 Socio Economic Duty 
6.5.3 Islands 
Discretions are determined by pension regulations with local authorities
determining whether or not to exercise a specific discretion.  A number of
discretions are age specific but again this is not imposed by the Council but is
a requirement of the Regulations.  Nevertheless, discretions that are age
specific may give rise to an adverse impact on account of age.  To mitigate
this impact, discretions will be applied in a fair, consistent and transparent
manner. 
6.6  Climate Change:  None. 
6.7  Risk:   The Council must publish its Policy on Discretions
under the Local Government Pension Scheme
(Scotland) Regulations 2018.  HR will monitor the
application of the policy and the Flexible Retirement
Procedures to ensure fairness and consistency. 
6.8  Customer Service:  The provision of a Policy on Discretions will make it
clear to both current employees and deferred members
the council’s position on the discretions and in what
circumstances they may be used. 
6.9  The Rights of the  None. 
Child (UNCRC): 
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Policy Lead: Councillor Mark Irvine 
April 2025 
For further information contact: 
Jane Fowler, Head of Customer Support Service, jane.fowler@argyll-bute.gov.uk 
Susan Hamilton, HR Operations Manager, susan.hamilton2@argyll-bute.gov.uk 
Page 139

Page 140

This page is intentionally left blank

Page 141

ARGYLL AND BUTE COUNCIL            POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND 
ECONOMIC GROWTH             8 MAY 2025 
PLACE BASED INVESTMENT 2025/26 – PBI PROJECTS AND ALLOCATION 
CROWN ESTATE 2025/26 – UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1 The Scottish Government have indicated that Argyll and Bute Council will be
allocated funding of £496,000 for financial year 2025/26 from its Place Based
Investment (PBI) Programme. It should be noted that at the time of writing this
report formal confirmation of funding has yet to be received from the Scottish
Government.  The purpose of this report is to seek members formal approval
for the projects to be supported via this year’s PBI funding allocations as
detailed in Table 1. 
1.2 This report follows on from the email communication to all Elected members
from the Executive Director with responsibility for Development and Economic
Growth suggesting projects that could be funded by PBI and seeking
members views on these and other suggestions which would fit within the
funds criteria and timeline. 
1.3 It should be noted, that no formal funding commitment will be made until such
time as the PBI budget for 2025/26 is confirmed in writing by the Scottish
Government 
1.4 The report also highlights that members will require to give consideration to
the Crown Estate (CE) funding for 2025/26. Whilst the Council has not yet
been advised of the formal allocation it is considered, based on previous
year’s allocations, that a prudent estimate of £0.8m of anticipated funding in
2025/26, should be considered. 
1.5 A further report on the proposed allocation of the Crown Estate Funding for
2025/26 will be brought forward to the 21st August meeting of the Policy and
Resources Committee to allow sufficient time for third party projects submitted
on the Council’s Aspiring Places Portal to be considered for potential funding
in an open and transparent manner.
Page 141 Agenda Item 12

Page 142

1.6 The approach being taken reflects the decision taken at the Policy and
Resources Committee in August 2022 whereby it was agreed that
suggestions for future years of Placed Based Investment and Crown Estates
funding were welcomed from all Elected Members, and that it would be
beneficial for any future options to be discussed by Elected Members in
advance of confirmation of these funds. 
1.7 The Executive Director with responsibility for Development and Economic
Growth has written to all Councillors seeking suggestions for potential projects
which would fit within the CE funding criteria and timelines.  At the time of
writing this report, project proposals have been received from 4 elected
members. 
RECOMMENDATIONS 
It is recommended that Policy and Resources Committee: 
a) Consider and agree to the allocation of the Place Based Investment
funding for 2025/26 to the projects in Table 1, paragraph 4.6 subject to
confirmation of funding. 
b) Note that Transformation Projects and Regeneration Team will liaise with
colleagues on the Aspiring Places project to determine potential third party
projects to be considered for Crown Estates funding. 
c) Note that, following consultation with all elected members and key
stakeholders, a further report on the proposed allocation of the Crown
Estate Funding for 2025/26 will be brought to the 21st August meeting of
the Policy and Resources Committee. 
Page 142

Page 143

ARGYLL AND BUTE COUNCIL            POLICY AND RESOURCES
COMMITTEE 
DEVELOPMENT AND 
ECONOMIC GROWTH                     8 MAY 2025 
PLACE BASED INVESTMENT 2025/26 – PBI PROJECTS AND ALLOCATION 
CROWN ESTATE 2025/26 – UPDATE 
2.0 INTRODUCTION 
2.1 The Scottish Government have indicated that Argyll and Bute Council will be
allocated funding of £496,000 for financial year 2025/26 from its Place Based
Investment (PBI) Programme. It should be noted that at the time of writing this
report formal confirmation of funding has yet to be received from the Scottish
Government. 
2.2 The purpose of this report to ask members to agree in principle to the
allocation of Argyll and Bute Place Based Investment (PBI) for 2025/26 as
detailed in Table 1.  It should be noted, that no formal funding commitment will
be made until such time as the PBI budget for 2025/26 is confirmed in writing
by the Scottish Government. 
2.3 The projects proposed are considered to fit strongly with the PBI criteria and
deliver on the Council’s economic development priorities.  All of the projects
suggested will add value to investment that has already been made by the
Council, deliver on our regeneration outcomes for our places, take account of
available officer resources and are deemed to be deliverable within the
2025/26 financial year (a key requirement of the funding). 
2.4 The purpose of this report is also to highlight to members that consideration
will also need to be given to Crown Estate (CE) funding that is expected within
2025/26. Although the CE allocation for 2025/26 is not yet confirmed, in
previous years it has been recommended that the Council could commit up to
£0.8m of anticipated funding in advance of formal notification and this would
again be recommended for 2025/26.     
2.5 In order to advance this process and as agreed at the Policy and Resources
Committee in August 2022, the Executive Director with responsibility for
Development and Economic Growth has written to all Councillors seeking
suggestions for potential projects which would fit within the CE funding criteria
and timelines.  At the time of writing this report, project proposals have been
received from 4 elected members. 
Page 143

Page 144

2.6 A report will be brought back to the August meeting of the Policy and
Resources Committee for formal approval of the proposed projects for
2025/26 CE funding.  This is to allow sufficient time for third party projects
submitted on the Council’s Aspiring Places Portal to be considered for
potential funding in an open and transparent manner.  Members are asked to
note that this is a requirement of subsidy control legislation.   
3.0 RECOMMENDATIONS 
3.1 It is recommended that Policy and Resources Committee: 
a) Consider and agree to the allocation of the Place Based Investment
funding for 2025/26 to the projects in Table 1, paragraph 4.6 subject to
confirmation of funding. 
b) Note that Transformation Projects and Regeneration Team will liaise with
colleagues on the Aspiring Places project to determine potential third party
projects to be considered for Crown Estates funding 
c) Note that, following consultation with all elected members and key
stakeholders, a further report on the proposed allocation of the Crown
Estate Funding for 2025/26 will be brought to the 21st August meeting of
the Policy and Resources Committee. 
4.0 DETAIL 
4.1 The 2020 Programme for Government committed to establishing a Place
Based Investment Programme (PBIP), linking and aligning place-based
funding initiatives. The Scottish Government confirmed that Local Authorities
would receive a share of the PBIP funding over a 5-year period, including the
initial year 2021/22, to support and advance place-based investment and build
on the strong partnership currently existing through the Regeneration Capital
Grant Fund.   
4.2 Argyll and Bute Council’s allocation for year 1 (2021/22) was £821,000. The
Council’s allocations for year (2022/23) was £714,000. The allocation for
2023/24 was £496,000.  No PBIP allocation was made in 2024/25 due to
budget pressures.  The allocation for 2025/26 is anticipated to be £496,000
although the Council are awaiting formal confirmation from the Scottish
Government. 
4.3 The main objectives of the PBIP are:  
• to link and align place-based initiatives, and establish a coherent local
framework to implement the Place Principle. 
Page 144

Page 145

• to support place policy ambitions such as town centre revitalisation,
community led regeneration, 20 minute neighbourhoods and Community
Wealth Building; 
• to ensure that all place-based investments are shaped by the needs and
aspirations of local communities; and,
• to accelerate our ambitions for net zero, wellbeing and inclusive economic
development, tackling inequality and disadvantage, community
involvement and ownership. 
4.4 The challenge in respect of the fund is to identify projects that meet the place-
based criteria, and are able to be delivered within the financial year in which
funding is awarded taking cognisance of limited staff resources. Projects to be
delivered under the 2025/26 allocation need to be delivered in a 9 month
period and therefore need to be sufficiently well advanced in terms of their
development.  The Council will also require to be content that any third party
projects can be delivered on time, satisfy any subsidy control requirements,
and meet the funding criteria set out above. 
4.5 As with previous year’s PBI funding, the focus for this year’s programme is on
projects that are at delivery stage and can be completed in financial year
2025/26. The projects need to fit with the PBIP criteria, have the ability to
build on previous investments, and require the resources to be in place to
ensure delivery within the timescales required by the Scottish Government. 
4.6 The projects identified in Table 1 have been selected based on their strong fit
with PBI funding criteria and all are considered deliverable in the 2025/26
financial year.   
Table 1 Place Based Investment 2025/26 Allocation 
Project  Consideration
Fit with Criteria 
2025/26 
Place Based
Investment 
Albert Pier – regeneration works
to formalise parking
arrangements and provide
dedicated facilities for visiting
coaches.  Project represents next
phase of works following
proposed demolition of vacant
property on Albert Pier using
Crown Estates funding.
Strong fit with PBI – adds
value to previous works,
deliverable within 2025/26.  
£100,000 
Victoria Hall, Campbeltown –
repair and refurbish entire front
elevation on prominent town
centre building.  Adds value to
previous town centre
regeneration activities funded via
CARS. 
Strong fit with PBI – builds
on previous funding
secured, council project,
deliverable within time
frame.
£100,000
Page 145

Page 146

Shopfront and business
support - flexible fund to support
businesses with capital
improvements to
shopfronts/buildings supporting
previous regeneration
investment. 
Project can deliver town
centre enhancements
across Argyll and Bute. 
Strong fit with PBI – adds
value to existing funding
secured, deliverable within
time frame, resources and
expertise in place to deliver
these works.  
£56,000
CCTV – upgrade to CCTV in
town centres. 
Long standing aspiration to
upgrade town centre CCTV.
Partnership project with
Police Scotland and strong
community safety focus. 
Deliverable within time
frame with resources in
place. This will be a capital
only investment subject to
agreement with Police
Scotland.   
Up to £100,000
Helensburgh Outdoor Museum
- commission artist/arts
organisation to deliver community
engagement and to further
develop the Outdoor Museum as
a heritage-led attraction for
Helensburgh.  This will deliver
further artworks increasing the
potential for the outdoor museum
to act as a key tourist attraction
for Helensburgh.  
Strong fit with PBI, adds
value to existing projects,
deliverable within time
frame, resources in place.
£80,000
Rockfield Centre Oban- Outdoor
Works Phase 2.  Enhancements
to external space including
improved car park and installation
of EV charging facilities. Provides
enhanced events space and
assists with on-going operational
costs helping to make this key
town centre facility more
sustainable by increasing the
potential for revenue generation.  
Strong fit with PBI, adds
value to previous funding
secured, deliverable within
time frame. 
£60,000
TOTALS  £496,000 
4.9 The projects identified above all meet the funding criteria for the PBI
programme and all are considered to be deliverable within the 2025/26
financial year.  It should however be noted, that capital projects are becoming
more challenging to deliver and as such, an element of flexibility may be
required if it becomes evident that projects are no longer viable.  
Page 146

Page 147

5.0 CONCLUSION 
5.1 The relatively tight timescales associated with the PBI fund, combined with the
large number of existing projects being delivered by the council, make for a
challenging place based investment programme. The projects identified above all
meet the funding criteria for the PBI programme and are considered deliverable
within the 2025/26 financial year.  These projects also build on investment already
in place in our town centres and will support projects being delivered through other
place-based work such as the Lochgilphead and Helensburgh CARS.  Note that
a further report on the proposed allocation of the Crown Estate Funding for
2025/26 will be brought forward to the 21st August meeting of the Policy and
Resources Committee to allow sufficient time for third party projects submitted on
the Council’s Aspiring Places Portal to be considered for potential funding in an
open and transparent manner. 
6.0 IMPLICATIONS 
6.1 Policy - There is a need to comply with the Scottish Government ‘place’ policies
as outlined in paragraph 4.3 and associated guidance for the Fund.  
6.2 Financial - The Scottish Government expect that any uncommitted funds by
31st March 2026 will be returned to Scottish Government. 
6.3  Legal – Projects must be delivered in line with Central Government funding
criteria. This includes compliance with subsidy control and policies such as
Fair Work. 
6.4  HR – Projects will be delivered from existing staff resources in partnership and
funding will be managed by the Transformational Projects and Regeneration
Team within DEG. 
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics - None
6.5.2   Socio-economic Duty - The Fund will support local economies through
place-based centre regeneration activity. 
6.5.3  Islands - The Fund will support island economies through place-based
regeneration activity and has the potential to align with, and add value
to, the Islands Programme. 
6.6 Climate Change – Management of whole life carbon emissions will be
factored into projects. 
6.7 Risk - In order for each project to progress to delivery stage, a fully let contract
must be in place by 31st March 2026. The projects will be continually monitored
to ensure that funds can be reallocated to another Place Based Investment
Fund project to avoid having to return any uncommitted funds to Scottish
Government at this time. 
Page 147

Page 148

6.8  Customer Service – None. 
6.9 The Rights of the Child (UNCRC) – None. 
Kirsty Flanagan, Executive Director with responsibility for Development and 
Economic Growth    
Councillor Jim Lynch, Policy Lead for Economic Development, Islands, Rural
Communities and Housing 
7th April 2025                                             
For further information contact: 
Fergus Murray - Head of Development and Economic Growth 
fergus.murray@argyll-bute.gov.uk 
Jonathan Welch - Transformation Projects and Regeneration Manager 
jonathan.welch@argyll-bute.gov.uk 
Page 148

Page 149

ARGYLL & BUTE COUNCIL  POLICY & RESOURCES
COMMITTEE 
LEGAL AND REGULATORY SUPPORT  8 May 2025 
EXTRACT OF MINUTE ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE
COMMITTEE HELD ON 20 MARCH 2024 
*10.    HELENSBURGH WASTE TRANSFER STATION PROJECT UPDATE 
The Committee gave consideration to a report providing an update on the Helensburgh
Waste Transfer Station project following the completion of the Options Appraisal and
making a recommendation in relation to the next steps for this project and associated
budgets. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted that the proposed Helensburgh Waste Transfer Station no longer provided the
optimum solution to ensure Biodegradable Municipal Waste compliant disposal
arrangements in the Helensburgh and Lomond area; 
2. agreed that officers should not progress further with the development and delivery of
the Helensburgh Waste Transfer Station Project; 
3. recommended to the Policy and Resources Committee that the remainder of the £3m
of budget earmarked for this project be retained to support other funding related
pressures within the waste service; and 
4. noted that should circumstances change, specifically the cost benefit ratio, that the
scheme could be revisited. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated February 2025, submitted) 
Page 149 Agenda Item 13

Page 150

This page is intentionally left blank

Page 151

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE                                                                           
ROAD AND INFRASTRUCTURE                                            20 MARCH 2025 
HELENSBURGH WASTE TRANSFER STATION PROJECT UPDATE 
1.0 EXECUTIVE SUMMARY
1.1  This report provides an update on the Helensburgh Waste Transfer Station
project following the completion of the Options Appraisal and makes a
recommendation in relation to the next steps for this project and associated
budgets. 
1.2   The requirement for the Council to develop a Waste Transfer Station to
service the Helensburgh and Lomond area was set out in a report to this
Committee on 21 December 2022 as part of a report entitled “Waste PPP
Options Appraisal”. That report provided an initial cost estimate for the project
of £3m. 
1.3   Funding for the development of a Waste Transfer Station to serve the
Helensburgh and Lomond area was approved by Council in February 2023 as
part of the Budget setting meeting. At that meeting Council approved a budget
of £3.5m in relation to preparations for the upcoming Biodegradable Municipal
Waste (BMW) Ban as part of series of additional capital allocations for
“investing in Argyll and Bute’s Priorities”. The Helensburgh Waste Transfer
Station project with an initial estimated cost at that time of £3m was the
largest in a number of projects to be funded from that budget, the other £0.5m
being intended to support the cost of converting the existing Mechanical and
Biological Treatment (MBT) facilities into waste transfer stations. 
1.4   Following budget approval officers undertook the design and other activities
required to move the project to an advanced stage of maturity whereby a full
works tender pack was prepared and planning approval achieved. The project
achieved this level of maturity in early January 2025. 
1.5   Prior to issuing the works tender to the construction market a project review
using the HM Treasury Green Book approach of the production of an Outline
Business Case was undertaken in order to assess that the project remained
the best value for money method through which the Council could be assured
that its waste disposal arrangements in the Helensburgh and Lomond area
are compliant with the upcoming BMW Ban. This project review took place
Page 151

Page 152

across the period December 2024 to early January 2025. 
1.6   The project review (described at paragraph 1.5 of this report) determined that
the Helensburgh Waste Transfer Station Project no longer provides the
optimum solution to ensure BMW compliant waste disposal arrangements in
the Helensburgh and Lomond area, is not required to ensure BMW
compliance and does not offer a good return on investment (value for money)
for the Council. 
RECOMMENDATIONS 
It is recommended that the Environment, Development and Infrastructure
Committee:- 
1. Notes that the proposed Helensburgh Waste Transfer Station no longer
provides the optimum solution to ensure BMW compliant waste disposal
arrangements in the Helensburgh and Lomond area.   
2. Agrees that officers should not progress further with the development and
delivery of the Helensburgh Waste Transfer Station Project.  
3. Recommends to the Policy and Resources Committee that the remainder of
the £3m of budget earmarked for this project be retained to support other
funding related pressures within the waste service. 
Page 152

Page 153

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE                                                                           
ROAD AND INFRASTRUCTURE                                           20 MARCH 2025 
HELENSBURGH WASTE TRANSFER STATION PROJECT UPDATE 
2.0 INTRODUCTION
2.1 This report provides an update on the Helensburgh Waste Transfer Station
project following the completion of the Options Appraisal and makes a
recommendation in relation to the next steps for this project and associated
budgets.  
3.0 RECOMMENDATIONS
3.1  It is recommended that the Environment, Development and Infrastructure
Committee:- 
1. Notes that the proposed Helensburgh Waste Transfer Station no longer
provides the optimum solution to ensure BMW compliant waste disposal
arrangements in the Helensburgh and Lomond area.   
2. Agrees that officers should not progress further with the development and
delivery of the Helensburgh Waste Transfer Station Project.  
3. Recommends to the Policy and Resources Committee that the remainder of
the £3m of budget earmarked for this project be retained to support other
funding related pressures within the waste service. 
4.0 DETAIL
4.1 The concept of the Council building and operating a Waste Transfer Station in
the Helensburgh area was originally envisaged as a means to respond to the
closure of the local landfill site at Auchencarroch, ensure that waste disposal
operations for this area would be compliant with the upcoming ban on
municipal waste to landfill, and respond to the withdrawal from the market of
the waste off-taker historically utilised by the Council in the Helensburgh area.
Following budget approval by Council in February 2023, the project was
initiated with design, surveys, operational planning and regulatory approvals
progressing. 
Page 153

Page 154

4.2  By mid-January 2024 the project was a relatively mature stage with detailed
design complete and tender information ready to be issued to market for
purposes of procuring a construction contractor with planning approval for the
project having been secured (subject to a number of conditions as would
normally be the case for a project of this nature). In progressing the project to
this stage of maturity in the region of £190k had been expended on design
and other related fees. 
4.3  In the period between the initiation of this project following the February 2023
Council meeting and January 2025, the Council had successfully procured
and implemented waste disposal arrangements for the Helensburgh and
Lomond are that are BMW Ban compliant. These arrangements involve the
Council’s Refuse Collection Vehicles travelling to a waste off-taker in Linwood
(Paisely). As this is a circa 2-hour round trip these arrangements are less
efficient than the previous arrangements whereby residual waste was taken to
the Auchencarroch landfill site, but it is a BMW Ban compliant solution. As a
BMW Ban compliant waste disposal solution has been secured the rationale
for this project changed from being one that was required to ensure BMW Ban
compliance to one that would be desirable provided it can be demonstrated to
offer financial efficiencies to the Council when compared to the current
arrangements. 
4.4  At the direction of the Waste Strategy Project Board a project review was
undertaken to determine the value for money of this proposed project. To
progress this review consultants were appointed to produce an “Outline
Business Case” in line with HM Treasury Green Book standards and in line
with the Councils “Projects Pipeline” approach. The Outline Business Case
was utilised by the Interim Head of Roads and Infrastructure to inform a
review of the value for money of the proposed project.  
4.5  The project review identified that the estimated cost of delivering the project
stood at circa £3.6m, which is £0.6m higher cost than the currently available
budget. The review also looked in detail at the financial savings that the
project could achieve, for example through lowered vehicle fuel use, and
compared these against the additional new costs of operating a Waste
Transfer Station. This exercise determined that the running costs for the new
facility would lead to an increase in the annual revenue costs for the service of
between £110,704 and £207,326. In calculating this increase in costs two
scenarios were considered: scenario 1) the efficiency in staff time would not
be taken as a cashable saving with the staff being re-deployed to other
activities, and scenario 2) the efficiency in staff time being taken as a
cashable saving. As would be expected scenario 1 leads to the highest overall
increase in costs. The table below shows a summary of the savings,
additional new costs and overall cost increase in each scenario.
Page 154

Page 155

4.6 In order to demonstrate the total cost to the Council of the proposed project the
review modelled the revenue consequences of borrowing to fund the capital
investment. While the financing approach for the capital investment may
necessarily have required borrowing specifically for this project the benefit of
developing this model is that it demonstrates the real-life cost of the capital
investment. In line with standard Argyll and Bute Council methodology and HM
Treasury Green Book guidance, the life of the asset and hence financing period
has been assumed at a 60-year period at an assumed interest rate of 5.1%. This
exercise determined that when both the additional running costs of the facility
and the true cost of the capital are included the project would result in a total of
between £304,082 and £400,704 as shown in the table below. As in the table
above the difference between the two figures is a result of the scenarios
described above in relation to staffing efficiency. 
4.7 The project review recognised that constructing a Waste Transfer Station would
bring benefits in relation to service resilience. In order to better understand the
relative importance of these benefits an exercise was undertaken through
market intelligence to assess the alternative waste off-take arrangements that
would be open to the Council in the areas should the existing arrangements be
put at risk at a future point. This exercise determined that there are other off-take
Table 1.9 Ongoing Revenue Implications 
Cost per annum
Fuel savings for fleet -£50,000
Increased fees from commercial waste -£11,821
Costs of waste transfer i.e. cost of hiring larger
vehicles for transport to processing
+£104,000
Additional staffing +£40,000
Reduction in Staffing -£96,622
Running costs inclusive of utilities, inspections,
etc.
+£125,148
Total with retained staffing +£207,326
Total with reduced staffing +£110,704 
Table 1.10 Ongoing Revenue Implications with Capital Repayments 
Cost per annum
Fuel savings for fleet -£50,000
Increased fees from commercial waste -£11,821
Costs of waste transfer i.e. cost of hiring larger
vehicles for transport to processing
+£104,000
Additional staffing +£40,000
Reduction in Staffing -£96,622
Running costs inclusive of utilities, inspections,
etc.
+£125,148
Capital Repayment +£193,378
Total with retained staffing +£400,704
Total with reduced staffing +£304,082 
Page 155

Page 156

contractors in the area and while the costs may potentially be higher any
increase would not be anticipated to be as high as the total cost (Capital and
Revenue) associated with the development of the proposed Waste Transfer
Station.
4.8 Recognising that the proposed project would be likely to result in fuel savings
the review undertook an assessment of the likely reduction in transport related
pollutants that would be expected to result from the construction of a waste
transfer station and the bulking of waste from refuse collection vehicles onto
articulated HGV’s. The results of this exercise are shown in the table below,
while this demonstrates beneficial environmental gains these are not particularly
high when considering the level of investment required to achieve them.  
Tonnes Value per
tonne
Annual value
Carbon Reduction 197 £256 £50,349
Nitrous Oxide Reduction 0.78 £7,120 £5,584
Fine particulate Reduction 0.06 £81,847 £5,136 
4.9  In order to complete the value for money assessment a Benefits Costs Ratio
(BCR) was undertaken for both the Blackhill Waste Transfer Station and an
alternative proposal for a facility at Sandhill Point. The results are shown
below. A BCR of more than 1 shows positive value for money and it usually
anticipated that a BCR well above 1 would be required for most projects.  
Present Value
Costs
Present
Value Net
GVA
BCR
Option 4:
Sandpoint
Marina
Argyll & Bute £3.6m £2.8m 0.94
Scotland £3.6m £2.3m 0.78
Option 6a:
Blackhill– Staff
redeployment
Argyll & Bute £7.7m £5.9m 0.77
Scotland  £7.7m £7.1m 0.92
Option 6a:
Blackhill– Staff
reduction
Argyll & Bute £5.8m £2.8m 0.49
Scotland  £5.8m £4.7m 0.82 
4.10  There are a number of wider cost pressures facing the waste service in the
short-term. These include costs associated with resolving historic issues within
the PPP contract with Biffa, and include:- 
• indexation and the disposal of excess Compost Like Output (CLO) Material from
the MBT plants; 
Page 156

Page 157

• additional cost pressures resulting from ensuring compliance with the BMW Ban
including the conversion of the existing MBT sites to Waste Transfer Stations;
and 
• the cost of capping and restoration of the current landfill sites to meet the
requirements of the BMW Ban and regulatory requirements for these sites once
they are no longer in use. 
While initial estimates only of these costs are available at the current time, they
are anticipated to be significantly higher than the currently available budgets
even once taking into account the £1.5m in capital funding from the Scottish
Government provided to support the costs of BMW ban compliance. 
5.0 CONCLUSION
5.1 Having assessed the project from a number of different angles the review has
concluded that the construction of a new Waste Transfer Station does not
offer value for money to the Council. While the project does offer benefits in
terms of operational efficiency, resilience and carbon reduction it is difficult to
argue that these are of sufficient magnitude to justify either the initial capital
investment or the ongoing revenue investment. If at a future point in time the
operational circumstances change significantly then the project could be
revisited and if required revived. With detailed design completed, planning
approval (subject to conditions) achieved, and a construction tender pack
compiled the project would be cable of being re-mobilised at a future time,
recognising of course that planning and other approvals are time limited and
may require to be re-visited. 
5.2 With the waste service facing significant financial pressures in relation to BMW
Ban compliance and the end of the PPP contract, as set out at 4.10, it is
proposed that the remainder of the £3m initially earmarked for the development
of the Helensburgh Waste Transfer Station project be re-allocated to support
these wider cost pressures. Re-allocating the remainder of the earmarked
budget for this project to these purposes would ensure this investment remains
available for the purposes expressed by Council at its meeting in February 2023
when setting aside a budget of £3.5m in relation to preparations for the
upcoming Biodegradable Municipal Waste (BMW) Ban as part of series of
additional capital allocations for “investing in Argyll and Bute’s Priorities”.  
6.0 IMPLICATIONS
6.1 Policy – None arising from this report.
6.2 Financial – The financial implications are set out in the body of this report.
6.3  Legal – None arising from this report.
6.4  HR – None arising from this report.
6.5  Fairer Scotland Duty: None known.
Page 157

Page 158

6.5.1   Equalities - protected characteristics – None known.
6.5.2   Socio-economic Duty – None known.
6.5.3 Islands – None arising from this report.
6.6  Climate Change – The climate change considerations have been set out in the
body of this report. 
6.7 Risk – The risks associated with future service resilience in relation to the
waste off-take market in the Helensburgh and Lomond area have been set out
in the body of this report.
6.8  Customer Service – None arising from this report.  
6.9 The Rights of the Child (UNCRC) – None arising from this report. 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan
Policy Lead for Roads, Transport and Amenity: Councillor John Armour 
February 2025                                              
For further information contact: 
Stephen Hall, Interim Head of Road and Infrastructure Services 
stephen.hall@argyll-bute.gov.uk 
John Blake, Fleet Waste and Transport Manager
john.blake@argyll-bute.gov.uk   
Page 158

Page 159

Policy and Resources Committee Work Plan 2025-2026 
This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. 
Date 7. Report Title Dept/Section How Often? Date Due Comments 
8 May 2025 8. Budget Outlook
9. 
Financial Services  8 April 2025 
10. HSCP Financial Position  Financial Services  17 April 2025 
11. Empty Property Relief for
Businesses - Policy Update 
Financial Services  8 April 2025 
Corporate Plan 2025 - 2027
12. 
Customer Support
Services 
8 April 2025 
Artificial Intelligence Policy 
13. 
Customer Support
Services 
8 April 2025 
Equality Mainstreaming 2025
14. 
Customer Support
Services 
8 April 2025 
15. I-Trent HR and Payroll Systems
Replacement Project Update
Customer Support
Services 
8 April 2025 
Proposed Amendment to the Age at
which an LPGS Employee Can
Make an Application for Flexible
Retirement
Customer Support
Services and Legal
and Regulatory
Support 
8 April 2025 
16. Place Based Investment 2025/26 -
Place Based Investment Projects
and Allocation & Crown Estate
2025/26 - Update
Development and
Economic Growth 
8 April 2025 
17. Helensburgh Waste Transfer Station
Project Update
Roads and
Infrastructure
Services 
8 April 2025 Recommendation from EDI held
on 20 March 2025
Page 159
Agenda Item
14

Page 160

Policy and Resources Committee Work Plan 2025-2026 
This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. 
Date 18. Report Title Dept/Section How Often? Date Due Comments 
August 2025 Financial Report Monitoring Pack
19. 
Financial Services Every meeting
except May   
20. Budget Outlook Financial Services 
Community Empowerment
(Scotland) Act 2015 – Update on
Expressions of Interest / Asset
Transfer Requests
21. 
Commercial
Services   
Date Report Title Dept/Section How Often? Date Due Comments 
October 2025 Financial Report Monitoring Pack  Financial Services Every meeting
except May   
Budget Outlook Financial Services 
Argyll And Bute Uk Shared
Prosperity Fund Investment Plan
Development and
Economic Growth   
Date Report Title Dept/Section How Often? Date Due Comments 
December 2025 Financial Report Monitoring Pack  Financial Services Every meeting
except May   
Budget Outlook Financial Services 
Date Report Title Dept/Section How Often? Date Due Comments 
Page 160

Page 161

Policy and Resources Committee Work Plan 2025-2026 
This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. 
19 February
2026
Financial Report Monitoring Pack  Financial Services Every meeting
except May
20 January 2026 
Budget 2026-2027 Financial Services 
22. Treasury Management Strategy and
Annual Investment Strategy 
Financial Services 
Future Items – Date to be determined. 
Key Performance Indicators FQ2 –
2022/2023 – changing to Corporate
Outcome Indicators
Customer Support
Services
Annual   
Historic Environment Scotland
Heritage and Place Programme –
Opportunity for Place Based
Heritage Funding
Development and
Economic Growth   
UK Shared Prosperity Fund – Argyll
and Bute Investment Plan
Development and
Economic Growth  
Regular updates to be provided. 
Agreed 11.08.2022 
Rothesay Pavilion - Rural Growth
Deal 
Development and
Economic Growth 
Update to be provided following
approval of the Rural Growth
Deal Full Business Case by the
UK and Scottish Government. 
Crown Estate Allocation  Development and
Economic Growth  
Report to come with 2025/26
allocation.