Page 1
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE FINANCIAL SERVICES 8 MAY 2025 BUDGET OUTLOOK 2026-27 TO 2030-31 1. EXECUTIVE SUMMARY 1.1 This report summarises the Budget Outlook for the five year period 2026-27 to 2030-31, taking account of the budget decisions approved at the Council meeting on 27 February 2025. This is the first outlook report of the new financial year, rolling forward previous forecasts and extending the period to 2030-31, as well as updating planning assumptions, as appropriate. These assumptions will continue to be updated and refined on an ongoing basis throughout the year. 1.2 The Budget Outlook has been prepared using three different scenarios, best case, worst case and mid-range. The detailed information focusses primarily on the mid-range scenario, however, all three scenarios are outlined within Appendix 1. 1.3 1.4 There has been no change to assumptions in respect of future years’ Scottish Government funding since those reported as part of the Budget Pack on 27 February 2025. Despite an unexpected effective increase of 1.47% in our 2025-26 settlement, it would be imprudent to assume similar increases in future years, with increases over the previous 3 years being as low as 0.01%. At this stage, a Scottish average increase of 0.5% for the mid-range, with a variation of 0.5% for the best and worst case scenarios, are the suggested planning assumptions. As this council relies on the floor mechanism to protect its funding level, our settlement is lower than the Scottish average change. The floor was set at 0.75% below the Scottish average in 2025-26 and is likely to continue at this level. As such, funding assumptions for this council range between an increase of 0.25% (best case) and a reduction of 0.75% (worst case), with a reduction of 0.25% in the mid-range scenario. At this stage, it continues to be deemed prudent not to assume that funding received in respect of Packaging Extended Producer Responsibility from the Department of Environment, Food and Rural Affairs (DEFRA) in 2025-26 will be recurring in 2026-27 and future years, without a reduction in Scottish Government grant funding. Funding conditions and future years budget pressures remain unclear and the final allocation for 2025-26 is not expected to be confirmed until the autumn. 1.5 There are no changes to previous assumptions in respect of Council Tax growth. The Council Tax base is assumed to grow by 0.25% in the worst case, 0.5% in the mid-range and 0.75% in the best case scenarios. 1.6 Assumptions in respect of employee costs for council services are as follows:
Page 2
The Public Sector Pay Policy, published alongside the Scottish Budget, sets out a multi-year framework of a 9% pay envelope covering 2025-26, 2026- 27 and 2027-28. A planning assumption of 3% across each of these years has been applied in both the best case and mid-range scenarios, with 5% assumed in the worst case scenario. For 2028-29 and 2029-30, the best case scenario has been reduced to 2%, while the mid-range remains at 3% and worst case remains at 5%. The SJC and Chief Officers pay awards for 2025-26 have still to be agreed and may have an impact on the base budget if the pay award is higher than the 3% allowed for in the budget. The Teachers pay award now covers the period August to July and for 2025-26 has already been agreed up to 31 July 2025, however, any increase beyond that date is still in the negotiation stage. The cost of pay increments for 2025-26 is estimated at £0.599m. For future years, an equivalent cost has been assumed in the mid-range and worst case scenarios, while half the estimated 2025-26 cost has been assumed in the best case scenario. 1.7 For non-pay inflation, only unavoidable inflation has been provided for within each scenario, with the mid-range scenario based on current market forecast data, where available. A further general inflation contingency has been built into the mid-range and worst case scenarios. Due to current market volatility and prevalent levels of uncertainty, at this stage, there has been no change to the inflationary assumptions included within the 2025-26 Budget Pack. 1.8 There are a number of cost and demand pressures for council services built into each scenario, across all five years, comprising the following: ASN Support Election Costs Education ICT Network Infrastructure Planning (Local Development Plan) Universal Credit – HB Admin grant Civica Revenue and Benefits Management System Compliance with BMW Ban Bus Transport Contracts Migration to Teams Telephony Valuation Joint Board 1.9 In addition to the identified cost and demand pressures, a general allowance for currently unforeseen or unquantifiable cost and demand pressures has been included in each scenario (best case £0.250m, mid-range £0.500m and worst case £1m per year). 1.10 Political decisions will require to be made in respect of the allocation to the Health and Social Care Partnership in future years. As part of the 2025-26 budget process, indicative base allocations of £85.045m were agreed for 2026- 27 and 2027-28, with future years’ allocations being subject to Scottish Government grant funding and the council’s overall financial position. The
Page 3
indicative allocation for 2026-27 represents an increase of £3.053m to flat cash, reflecting the non-recurring saving in relation to the Strathclyde Pension Fund contribution. 1.11 The budget gap in the mid-range scenario, prior to measures to balance the budget, either from previous savings decisions or new potential options, is estimated at £14.442m in 2026-27 and £58.195m over the five year period 2026-27 to 2030-31. 1.12 The measures to balance the budget over the next five years are as follows: Proposed increases to fees and charges of between 3% and 9% each year (6% mid-range). Proposed increases to Council Tax at 5% each year for all scenarios. Management/Operational and Policy savings already agreed by Council in February 2025 and previous years. 1.13 The budget gap in the mid-range scenario, after measures to balance the budget, is estimated at £9.568m in 2026-27 and £33.846m over the five year period 2026-27 to 2030-31. 1.14 The budget gap in the best case scenario is estimated at £6.068m in 2026-27 and £13.415m over five years, increasing to £16.159m in 2026-27 and £67.384m over five years in the worst case scenario. A summary of all three scenarios is included within Appendix 1. 1.15 It is recommended that the Policy and Resources Committee consider the current Budget Outlook position for the period 2026-27 to 2030-31.
Page 4
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE FINANCIAL SERVICES 8 MAY 2025 BUDGET OUTLOOK 2026-27 TO 2030-31 2. INTRODUCTION 2.1 This report summarises the Budget Outlook for the 5-year period 2026-27 to 2030-31, taking account of the budget decisions approved at the Council meeting on 27 February 2025. This is the first outlook report of the new financial year, rolling forward previous forecasts and extending the period to 2030-31, as well as updating planning assumptions, as appropriate. These assumptions will continue to be updated and refined on an ongoing basis throughout the year. 2.2 The Budget Outlook has been prepared using three different scenarios, best case, worst case and mid-range. Relatively small variations in assumptions can lead to fairly significant changes in the outcome. In the paragraphs that follow, the mid-range outlook is shown, however, all three scenarios are detailed within Appendix 1. 3. RECOMMENDATIONS 3.1 It is recommended that the Policy and Resources Committee consider the current Budget Outlook position for the period 2026-27 to 2030-31. 4. DETAIL 4.1 Funding Scottish Government Finance Settlement 4.1.1 4.1.2 Estimates of future Scottish Government funding levels is one of the key assumptions within the Budget Outlook. Whilst council’s are recommended to prepare longer term financial plans, with a focus on financial sustainability, this is more challenging with one year Scottish Government finance settlements. Council’s will continue to lobby via COSLA for multi-year settlements to assist with longer term financial planning. As part of the 2025-26 budget setting process, members were advised that despite an unexpected effective increase of 1.47% in our 2025-26 settlement, it would be imprudent to assume similar increases in future years, with increases over the previous 3 years being as low as 0.01%. There has been no change to assumptions in respect of future years’ Scottish Government funding since those reported as part of the Budget Pack on 27 February 2025. At this stage, a Scottish average increase of 0.5% for the mid-range, with a variation of 0.5% for the best and worst case scenarios, are the suggested planning assumptions. As this council relies on the floor mechanism to protect its funding level, our
Page 5
settlement is lower than the Scottish average change. The floor was set at 0.75% below the Scottish average in 2025-26 and is likely to continue at this level. As such, our funding assumptions range between an increase of 0.25% (best case) and a reduction of 0.75% (worst case), with a reduction of 0.25% as the mid-range scenario. 4.1.3 The table below summarises the mid-range scenario estimates based on a 0.25% settlement reduction year on year. This includes additional funding in respect of increased Employer’s National Insurance Contributions. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Estimated SG Funding 261,058 260,406 259,755 259,106 258,459 4.1.4 At this stage, it continues to be deemed prudent not to assume that funding received in respect of Packaging Extended Producer Responsibility from the Department of Environment, Food and Rural Affairs (DEFRA) in 2025-26 will be recurring in 2026-27 and future years, with no reduction in Scottish Government grant funding. Funding conditions and future years budget pressures remain unclear and the final allocation for 2025-26 is not expected to be confirmed until the autumn. It was agreed as part of the 2025-26 budget process that £2.499m of the estimated 2025-26 funding of £3.847m would be carried forward for use in 2026-27. Council Tax 4.1.5 The Council Tax base for 2025-26 is set at £70.204m, which reflects the 9.9% increase agreed by the Council on 27 February 2025. 4.1.6 There are no changes to previous assumptions around the growth in Council Tax. It has been assumed that there will be 0.5% growth in the mid-range scenario for all years from 2026-27 (0.75% in the best and 0.25% in the worst case scenarios). Following the setting of Council Tax in February, the future years estimates have been updated reflecting the adjusted base Council Tax Budget. 4.1.7 In the first instance, this report presents the budget gap, prior to any measures to balance the budget. For this purpose, Council Tax is assumed to remain at the same levels as 2025-26, with only growth in the Council Tax base reflected. General Fund 4.1.8 As reported in prior years, reduced employer contribution rates payable to Strathclyde Pension Fund will result in one-off savings in 2024-25 and 2025-26. It was agreed by Council in February 2024 that £2m of the pension fund gain would be released each year for a period of 3 years (2024-25 through to 2026- 27), in order to help bridge the budget gap.
Page 6
Funding Summary 4.1.9 The table below summarises the estimated total funding in the mid-range scenario over the 5 years 2026-27 to 2030-31. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Estimated SG Funding 261,058 260,406 259,755 259,106 258,459 EPR – 2025-26 DEFRA Funding C/fwd 2,499 0 0 0 0 Released Strathclyde Pension Fund Gain 2,000 0 0 0 0 Council Tax Base 70,204 70,204 70,204 70,204 70,204 Council Tax Growth 351 704 1,059 1,415 1,773 Total Estimated Funding 336,112 331,314 331,018 330,725 330,436 4.2 Base Budget 4.2.1 The 2025-26 budget approved by Council on 27 February 2025 was £328.289m. This included the 2025-26 debt charge implications of approved borrowing for additional capital investment. There was also a decision to defer a policy saving in respect of Community Sports until 2026-27 onwards. The full year effect of these previous budget decisions on 2026-27 and future years are now incorporated as base budget adjustments. 4.2.2 The revised base budget is outlined in the table below: 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Base Budget 2025-26 328,289 328,289 328,289 328,289 328,289 Debt Charges Increase 95 95 95 95 95 Approved Policy Savings (20) (20) (20) (20) (20) Revised Base Budget 328,364 328,364 328,364 328,364 328,364 4.3 Employee Cost Changes Pay Award 4.3.1 The Public Sector Pay Policy, published alongside the Scottish Budget, sets out a multi-year framework of a 9% pay envelope covering 2025-26, 2026-27 and 2027-28. A planning assumption of 3% across each of these years has been applied in both the best case and mid-range scenarios, with 5% assumed in the worst case scenario. For 2028-29 and 2029-30, the best case scenario has been reduced to 2%, mid-range remains at 3% and worst case remains at 5%. 4.3.2 The SJC and Chief Officers pay awards for 2025-26 have still to be agreed and may have an impact on the base budget if the pay award is higher than the 3% allowed for in the budget. The Teachers pay award now covers the period August to July and for 2025-26 has already been agreed up to 31 July 2025, however, any increase beyond that date is still in the negotiation stage. It is worth noting that a pay offer has been made to the NHS Agenda for Change
Page 7
workforce. The offer comprises 4.25% for 2025-26 and 3.75% for 2026-27, with an inflation guarantee, whereby the increase in pay for each year of the deal will be above the CPI inflation rate. Increments 4.3.3 4.3.4 There remains a fairly regular turnover of staff within posts and when this happens, the cost of increments can, in some cases, be absorbed within the existing budget provision, as leavers who may be at the top their grade may be replaced by new starts at the grade entry point. The cost of pay increments for 2025-26 is estimated at £0.599m. For future years, an equivalent cost has been assumed in the mid-range and worst case scenarios, while half the estimated 2025-26 cost has been assumed in the best case scenario. 4.3.5 Strathclyde Pension Fund As previously reported, the employer contribution rate paid to the Strathclyde Pension Fund fell from 19.3% to 6.5% in 2024-25 and 2025-26, rising to a sustainable long term rate of 17.5% from 2026-27. The reduction in the first 2 years equates to reduced costs of £6.875m per annum relating to Council employees (excluding HSCP). From 2026-27 the costs will rise again to 17.5% therefore this increase is required to be built into projections from 2026-27 onwards. Employee Costs Summary 4.3.6 The table below summarises the employee cost movements in the mid-range scenario for council services over the five years 2026-27 to 2030-31. The future years estimates have been further refined, following approval of the 2025-26 budget in February 2025. The employee cost increases relating to Social Work within the Health and Social Care Partnership are summarised within paragraph 4.6.3. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Pay Award 4,752 9,530 14,452 19,521 24,743 Full Year Effect 2025-26 Teachers Pay Award 496 496 496 496 496 Increments 599 1,198 1,797 2,396 2,995 Reinstatement of Strathclyde Pension Fund contribution 6,875 6,875 6,875 6,875 6,875 Total Employee Cost Changes 12,722 18,099 23,620 29,288 35,109 4.4 Non-Pay Inflation 4.4.1 Non-pay inflation is only provided for within budget plans, where it is deemed to be unavoidable, for example in respect of contractual obligations. As not all
Page 8
4.4.2 4.4.3 4.4.4 4.4.5 budget elements are subject to inflationary increases, inflationary budget pressures may arise in some other areas and in order to manage spend within available budget resources, service rationalisation or efficiencies may require to be delivered. Non-pay inflation assumptions within the mid-range scenario are based on current market forecast data, where available. Officers continue to review inflation assumptions on an ongoing basis. However, due to current market volatility and prevalent levels of uncertainty, at this stage, there has been no change to the inflationary assumptions included within the 2025-26 Budget Pack. The Budget Outlook provides for unavoidable non-pay inflation within each budget scenario. In addition, due to prevailing levels of economic uncertainty, it is deemed prudent to include a further general inflation contingency within the mid-range and worst case scenarios at £250k and £500k each year respectively. This contingency will either be required, reduced or removed to reflect changing circumstances before the 2026-27 budget is set. The estimated cumulative inflation over the five years 2026-27 to 2030-31 in the mid-range scenario is outlined in the table below. Non-Pay Inflation (Unavoidable) 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 2,745 5,632 8,676 11,890 15,140 An analysis of the 2026-27 cost estimate in respect of the mid-range scenario across key inflationary drivers is given in the table below. The non-pay inflationary increases relating to Social Work within the Health and Social Care Partnership are summarised within paragraph 4.6.3. Inflation Category 2026-27 Estimate £000 Premises and Utilities (Rates, Electricity, Gas, Oil, Water) 280 Waste/Landfill Tax 335 NPDO/HUB Schools 382 Other Contracted Services 883 Insurance 414 Other Supplies and Services 201 General Contingency 250 Total 2,745 4.5 Cost and Demand Pressures 4.5.1 For a number of years, services have been required to manage any cost and demand pressures within current budgetary resources, as far as possible. However, there are a number of cost and demand pressures, already identified
Page 9
4.5.2 for future years, which cannot be contained without a detrimental impact on service provision. These have continued to be reported within previous Budget Outlook reports and as part of the Revenue Budget Overview report presented at the Council budget meeting on 27 February 2025. Since the budget meeting on 27 February 2025, there have been no changes to the cost and demand pressures within the mid-range scenario. 4.5.3 When creating a longer term budget outlook beyond the current year, there is a greater risk that currently unforeseen or unquantifiable cost and demand pressures will emerge across future years. It is therefore deemed prudent to include a general contingency, proposed at £0.250m within the best case, £0.500m within the mid-range and £1m within the worst case scenarios year on year. This contingency will either be required, reduced or removed to reflect changing circumstances before the 2026-27 budget is set. 4.5.4 The cost and demand pressures within the mid-range scenario are detailed in Appendix 2 and summarised in the table below. These will be subject to ongoing review throughout the financial year. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 ASN Support 208 422 422 422 422 Election costs 0 350 0 0 0 Education ICT Network Infrastructure 0 53 53 53 53 Planning (Local Development Plan) 50 0 0 0 0 Universal Credit – HB Admin Grant 40 80 120 160 200 Civica Revenue and Benefits System 0 63 63 63 63 Compliance with BMW Ban 2,479 3,051 3,051 3,051 3,051 Bus Transport Contracts 268 268 268 268 268 Migration from Skype for Business to Teams Telephony 63 300 300 300 300 Valuation Joint Board Requisition 255 301 301 301 301 Allowance for pressures in future years 500 1,000 1,500 2,000 2,500 Total Cost and Demand Pressures 3,863 5,888 6,078 6,618 7,158 4.5.5 The cost and demand pressures relating to Social Work within the Health and Social Care Partnership are summarised within paragraph 4.6.3. 4.6 Health and Social Care Partnership 4.6.1 As part of the 2025-26 budget process, indicative base allocations of £85.045m were agreed for 2026-27 and 2027-28, with future years’ allocations being
Page 10
subject to Scottish Government grant funding and the council’s overall financial position. The indicative allocation for 2026-27 represents an increase of £3.053m, reflecting the non-recurring saving in relation to the Strathclyde Pension Fund contribution. 4.6.2 Political decisions will require to be made in respect of the allocation to the Health and Social Care Partnership in future years. For the purposes of the Budget Outlook, flat cash allocations, adjusted for the Strathclyde Pension Fund saving, have been assumed across all scenarios. These are only indicative planning assumptions and it will be a matter for Council to consider any changes, as part of the budget process next year. 4.6.3 Social Work services have already identified a number of cost and demand pressures, included within Appendix 3, with the mid-range scenario summarised below. These are included for information purposes. It is expected that the HSCP will absorb their cost and demand pressures within their funding allocation. Note that these only extend to three years rather than the five years of the council’s Budget Outlook. 2026-27 £000 2027-28 £000 2028-29 £000 Pay Inflation 1,232 2,501 3,809 Pay Increments 198 396 594 Non-Pay Inflation 771 1,570 2,403 Adult Care - Older People 500 1,000 1,500 Adult Care – Mental Health 50 100 150 Looked After Children 0 250 500 General Contingency 200 400 600 Total Estimated Cost Increases - Social Work Cumulative 2,951 6,217 9,556 4.6.4 4.6.5 In addition to the cost and demand pressures outlined above, there will be a further £3m budget pressure from 2026-27, arising from the non-recurring use of reserves, as a measure to balance the 2025-26 budget. This financial outlook is extremely challenging, particularly given that HSCP reserve balances are expected to be depleted by 31 March 2026. The council’s Section 95 Officer has sought a financial recovery plan from the IJB, under the terms of the Integration Scheme, seeking assurance in respect of its current and future financial position. There is a risk to the council in respect of failure to manage the delivery of Social Work services within available resources. Under the terms of the Integration Scheme, any overspend on Social Work services, which cannot be met from existing reserve balances, may fall to be met by the council. In order to safeguard the financial position of the council, the financial position of the HSCP and related financial risk to the council will be closely monitored throughout the year. This will form part of the regular reporting to Policy and Resources Committee in respect of the current year revenue budget monitoring and financial risks, as well as future iterations of this Budget Outlook report.
Page 11
4.7 LiveArgyll 4.7.1 Political decisions will require to be made in respect of the allocation to LiveArgyll in future years. For the purposes of the Budget Outlook, flat cash allocations have been assumed across all scenarios, with the exception of previous budget decisions in respect of the Strathclyde Pension Fund adjustment relating to the cessation of the one-off employer contribution rate saving (£0.118m increase) and deferral of the 2025-26 proposed saving in the service fee to 2026-27 (£311k reduction). These are only indicative planning assumptions and it will be a matter for Council to consider any changes, as part of the budget process next year. 4.8 Estimated Budget Gap PRIOR to Measures to Balance the Budget 4.8.1 The budget gap in the mid-range scenario over the five years 2026-27 to 2030- 31, after allowing for the considerations outlined above and prior to measures to balance the budget, is outlined in the table below. This is the budget gap prior to factoring in any previous savings decisions or potential options towards balancing the budget. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Base Budget 328,289 328,289 328,289 328,289 328,289 Base Budget Adjustments 75 75 75 75 75 Employee Cost Changes 12,722 18,099 23,620 29,288 35,109 Non-Pay Inflation 2,745 5,632 8,676 11,890 15,140 Cost and Demand Pressures 3,863 5,888 6,078 6,618 7,158 Adjustment to HSCP Payment re SPF Gain 3,053 3,053 3,053 3,053 3,053 Adjustment to LiveArgyll Payment (193) (193) (193) (193) (193) Total Estimated Net Expenditure 350,554 360,843 369,598 379,020 388,631 Estimated Funding 336,112 331,314 331,018 330,725 330,436 Estimated Budget Surplus / (Gap) Cumulative (14,442) (29,529) (38,580) (48,295) (58,195) 4.9 Measures to Balance the Budget 4.9.1 In 2025-26, a general inflationary increase of 6% was applied to relevant fees and charges. For the Budget Outlook, a range of between 3% (worst case) and 9% (best case), with a mid-range of 6% has been assumed each year over the five years 2026-27 to 2030-31. As a result of 2025-26 budget decisions taken by Council on 27 February 2025 to freeze fees on council-run ferries, the forecast income from fees and charges in future years has been slightly
Page 12
reduced. 4.9.2 Some of the management/operational and policy savings options agreed at the Council meeting on 27 February 2025 and in previous years will impact the 2026-27 and future years budgets. These are reflected within the Budget Outlook over the five years 2026-27 to 2030-31. 4.9.3 In terms of Council Tax, a 5% increase has been assumed each year in all scenarios. All councils increased their Council Tax by at least 6% for 2025-26, with 13 increasing their Council Tax by more than 10%. With a focus on longer term financial sustainability and in light of the significant forecast budget gap over the next five years, the level of Council Tax increases in 2026-27 and in future years will require due consideration by Members, as part of the budget setting for 2026-27 and future years. 4.9.4 The table below summarises the proposed measures to balance the budget in the mid-range scenario. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Fees and Charges Increase 382 787 1,217 1,672 2,155 Council Tax Increase 3,528 7,268 11,212 15,372 19,758 Management/Operational Savings (48) (9) (9) (9) (9) Policy Savings 1,012 1,748 2,217 2,331 2,465 Total Measures to Balance the Budget 4,874 9,794 14,637 19,366 24,349 4.10 Estimated Budget Gap AFTER Measures to Balance the Budget 4.10.1 The table below summarises the estimated budget gap in the mid-range scenario. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Estimated Budget Gap Prior to Measures to Balance Budget (14,442) (29,529) (38,580) (48,295) (58,195) Measures to Balance Budget 4,874 9,794 14,637 19,366 24,349 Estimated Budget Surplus / (Gap) Cumulative (9,568) (19,735) (23,943) (28,929) (33,846) Estimated Budget Surplus / (Gap) In Year (9,568) (10,167) (4,208) (4,986) (4,917) 4.10.2 In the mid-range scenario, the budget gap is estimated at £9.568m in 2026-27 and £33.846m over the five year period 2026-27 to 2030-31.
Page 13
4.10.3 The budget gap in the best case scenario is estimated at £6.068m in 2026-27 and £13.415m over five years, increasing to £16.159m in 2026-27 and £67.384m over five years in the worst case scenario. A summary of all three scenarios is included within Appendix 1. 4.10.4 The changes from the previous Budget Outlook in the mid-range scenario, reported to Council on 27 February 2025, are summarised in the table below. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 Previously reported Budget Surplus / (Gap) Cumulative (9,588) (19,927) (24,316) (29,490) Adjustment to Council Tax 27 90 158 230 Adjustment to Employee Costs (4) 108 223 342 Adjustment to Fees and Charges (3) (6) (8) (11) Revised Budget Surplus / (Gap) Cumulative (9,568) (19,735) (23,943) (28,929) 5. CONCLUSION 5.1 In the mid-range scenario, the budget gap is estimated at £9.568m in 2026-27 and £33.846m over the five year period 2026-27 to 2030-31. Council officers are continuing to explore budget savings options during 2025-26 and these will be presented to Members in due course. 5.2 This is a very challenging Budget Outlook position. Variations to the assumptions in respect of future Scottish Government grant levels and pay awards would have a significant impact on the Budget Outlook. All assumptions will be kept under review, with the Budget Outlook updated, as and when further information becomes available. 6. IMPLICATIONS 6.1 Policy - Sets out the Budget Outlook that provides the financial envelope for policy decisions. 6.2 Financial - Sets best, worst and mid-range scenarios in respect of the Budget Outlook. The council are actively continuing to pursue opportunities to mitigate against future budget gaps. 6.3 Legal - None directly from this report but the Council requires to set a balanced budget. 6.4 HR - None directly from this report but there is a strong link between employee numbers and budgets. 6.5 Fairer Scotland Duty - 6.5.1 Equalities None directly from this report but any proposals to address the estimated budget gap will require to consider equality issues. 6.5.2 Socio Economic Duty None directly from this report but any proposals to
Page 14
address the estimated budget gap will require to consider socio economic issues. 6.5.3 Islands Duty None directly from this report but any proposals to address the estimated budget gap will require to consider any island specific issues. 6.6 Climate Change The Council is committed to addressing climate change and reviews how Services are delivering this on an ongoing basis, within the available budget resources. 6.7 Risk - None directly from this report but any proposals to address the estimated budget gap will require to consider risk. 6.8 6.9 Customer Service – The Rights of the Child (UNCRC) - None directly from this report but any proposals to address the estimated budget gap will require to consider customer service. None Kirsty Flanagan Executive Director/Section 95 Officer 14 April 2025 Councillor Ross Moreland, Policy Lead for Finance and Commercial Services APPENDICES: Appendix 1 – Budget Outlook - Best, Worst and Mid-range Scenarios Appendix 2 – Cost and Demand Pressures (Council Services) Appendix 3 – Cost and Demand Pressures (Social Work) For further information contact Carolyn Earl, Interim Head of Financial Services Carolyn.earl@argyll-bute.gov.uk
Page 15
BUDGET OUTLOOK 2026-27 to 2030-31 APPENDIX 1 Policy and Resources Committee - 8 May 2025 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Base Budget 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 Base Budget Adjustments 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 Revised Base Budget 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 Pay Award 4,752 9,530 12,811 16,158 19,572 4,752 9,530 14,452 19,521 24,743 7,919 16,041 24,570 33,525 42,928 Full year effect of 2025-26 pay award for teachers in 2026-27 496 496 496 496 496 496 496 496 496 496 496 496 496 496 496 Pay Increments 300 599 899 1,198 1,498 599 1,198 1,797 2,396 2,995 599 1,198 1,797 2,396 2,995 Re-instate Employers Superannuation Rate 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 Total Employee Cost Changes (Council Services) 12,423 17,500 21,081 24,727 28,441 12,722 18,099 23,620 29,288 35,109 15,889 24,610 33,738 43,292 53,294 Non-Pay Inflation - Council Services 1,771 4,011 6,381 8,893 11,871 2,745 5,632 8,676 11,890 15,140 3,692 7,259 11,012 14,968 18,968 ASN Support 208 422 422 422 422 208 422 422 422 422 208 422 422 422 422 Election Costs 0 327 0 0 0 0 350 0 0 0 0 370 0 0 0 Education ICT Network Infrastructure 0 53 53 53 53 0 53 53 53 53 0 53 53 53 53 Planning (Local Development Plan) 50 0 0 0 0 50 0 0 0 0 50 0 0 0 0 Housing Benefits Admin Grant 40 80 120 160 200 40 80 120 160 200 40 80 120 160 200 Civica Revenue and Benefits System 0 37 37 37 37 0 63 63 63 63 0 137 137 137 137 Compliance with BMW Ban 2,231 2,746 2,746 2,746 2,746 2,479 3,051 3,051 3,051 3,051 2,727 3,356 3,356 3,356 3,356 Bus Transport Contracts 268 268 268 268 268 268 268 268 268 268 268 268 268 268 268 Migration from Skype for Business to Teams Telephony 19 282 282 282 282 63 300 300 300 300 108 318 318 318 318 Valuation Joint Board 255 301 301 301 301 255 301 301 301 301 255 301 301 301 301 Allowance for Cost and Demand Pressures Future Years 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500 1,000 2,000 3,000 4,000 5,000 Total Cost and Demand Pressures 3,321 5,016 4,979 5,269 5,559 3,863 5,888 6,078 6,618 7,158 4,656 7,305 7,975 9,015 10,055 Adjustment to Health and Social Care Partnership Payment 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 3,053 Adjustment to Live Argyll Management Fee (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) Total Estimated Expenditure PRIOR to measures to balance the budget 348,739 357,751 363,665 370,113 377,095 350,554 360,843 369,598 379,020 388,631 355,461 370,398 383,949 398,499 413,541 Scottish Government Grant 262,366 263,021 263,678 264,337 264,997 261,058 260,406 259,755 259,106 258,459 259,749 257,801 255868 253,949 252,044 Packing Extended Producer Responsibility Funding - DEFRA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Transfer from Reserves - EPR funding carried forward from 2025-26 2,499 0 0 0 0 2,499 0 0 0 0 2,499 0 0 0 0 Transfer from Reserves - SPF Gain agreed February 2024 2,000 0 0 0 0 2,000 0 0 0 0 2,000 0 0 0 0 Council Tax 70,731 71,261 71,795 72,333 72,875 70,555 70,908 71,263 71,619 71,977 70,380 70,556 70,732 70,909 71,086 Total Funding 337,596 334,282 335,473 336,670 337,872 336,112 331,314 331,018 330,725 330,436 334,628 328,357 326,600 324,858 323,130 Budget Surplus / (Gap) PRIOR to measures to balance the budget (11,143) (23,469) (28,192) (33,443) (39,223) (14,442) (29,529) (38,580) (48,295) (58,195) (20,833) (42,041) (57,349) (73,641) (90,411) Measures to Balance the Budget: Fees and Charges 574 1,199 1,880 2,623 3,433 382 787 1,217 1,672 2,155 191 388 591 800 1,015 Council Tax Increase 3,537 7,277 11,231 15,409 19,823 3,528 7,250 11,176 15,316 19,681 3,519 7,223 11,121 15,223 19,538 Council Tax Increase (Growth element) 0 27 55 84 116 0 18 36 56 77 0 9 18 28 38 Policy Savings Agreed Feb 2023 476 1,112 1,581 1,695 1,809 476 1,112 1,581 1,695 1,809 476 1,112 1,581 1,695 1,809 NEW Management/Operational Options 2025 (48) (9) (9) (9) (9) (48) (9) (9) (9) (9) (48) (9) (9) (9) (9) NEW Policy Options 2025 536 636 636 636 636 536 636 636 636 636 536 636 636 636 636 Total Measures to Balance the Budget 5,075 10,242 15,374 20,438 25,808 4,874 9,794 14,637 19,366 24,349 4,674 9,359 13,938 18,373 23,027 Budget Surplus / (Gap) Cumulative AFTER measures to balance the budget (6,068) (13,227) (12,818) (13,005) (13,415) (9,568) (19,735) (23,943) (28,929) (33,846) (16,159) (32,682) (43,411) (55,268) (67,384) Budget Surplus / (Gap) In Year AFTER measures to balance the budget 0 (7,160) 410 (188) (410) (9,568) (10,167) (4,208) (4,986) (4,917) (16,159) (16,523) (10,729) (11,857) (12,116) Mid-Range ScenarioBest Case Scenario Worst Case Scenario
Page 16
COUNCIL COST AND DEMAND PRESSURES 2026-27 to 2030-31 Department Service Cost/Demand Pressure 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Executive Director - Douglas Hendry Education The demand for ASN support in Argyll and Bute has continued to grow with a significant increase in, and early identification of children and young people presenting with complex additional support needs, including mental health difficulties which manifests often in dysregulated behaviours. IScottish Government statistics show that the number of pupils identified with ASN has increased markedly since 2010 and there continue to be year on year increases. These increases are likely due to continue as we see the impact of the Covid 19 pandemic on children and young people who were born from 2020 onwards and as we work with partners to streamline assessment processes which help us to understand need more thoroughly. Scottish Government statistical datasets show that the percentage of school roll in mainstream schools of pupils with ASN has increased by approximately 3% year on year. Within many authorities, this means increased numbers of children accessing specialist provision. As Argyll and Bute do not have equitable access to Specialist provision in all areas, the cost pressure associated with offering appropriate support within our local schools continues to increase in line with need. 208 422 422 422 422 208 422 422 422 422 208 422 422 422 422 Executive Director - Douglas Hendry Legal and Regulatory Services Estimated cost (to be borne by the Council) of carrying out local Government elections in May 2027 (and in financial year 2027/28). Operating approx. 100 polling stations and carrying out poll and count for 11 Multi member wards – requiring 11 separate counts 0 327 0 0 0 0 350 0 0 0 0 370 0 0 0 Executive Director - Douglas Hendry and Kirsty Flanagan Education and ICT The Education ICT Network requires a transformative technology upgrade in 2025-26 with improved security and reconfiguration to support in-school and at home learning. A cost pressure was agreed as part of the budget for 2025-26. There was an ongoing revenue requirement built into the cost pressure and this is expected to increase from 2027-28. 0 53 53 53 53 0 53 53 53 53 0 53 53 53 53 Executive Director - Kirsty Flanagan Development & Economic Growth Local development plan will require to be done under the new Planning legislation which is a revised process from the current one and will have a 10 year life. The new process has 2 stages where there is likely to be a cost pressure - a gate check followed by an examination some time later. 50 0 0 0 0 50 0 0 0 0 50 0 0 0 0 Executive Director - Kirsty Flanagan Financial Services Universal Credit “Full” Service went live in Sept 2018, managed migration for working age claimants began in August 2023 and will be completed by December 2025. Details of the migration of Pension age Housing Benefit claimants have not yet been released initial indications was that the overall migration to Pension Credit will be completed in 2028/2029 although that looks unlikely now. The DWP will reduce the Housing Benefit Administration Subsidy they pay to the Council as some claimants come off of Housing Benefit processed by Council staff and go onto Universal Credit processed by the DWP. The Council’s caseload has reduced since implementation of Universal Credit but it is hard to predict just how quickly the rest of the caseload will migrate from Housing Benefit to Universal Credit between now and 2028/2029. These figures represent our best estimates at this time. 40 80 120 160 200 40 80 120 160 200 40 80 120 160 200 Executive Director - Kirsty Flanagan Financial Services The Council has been engaged in discussions with the supplier of the Revenues and Benefits Management System and also the Electronic Document Management System. We expect cost increases in the future as the supplier moves the systems to the Cloud. The cost presure is an estimate at this time and will be refined as we get nearer to 2027-28. 0 37 37 37 37 0 63 63 63 63 0 137 137 137 137 Executive Director - Kirsty Flanagan Roads & Infrastructure Services Achieving compliance with ban on biodegradable municipal waste (BMW) which comes into place on 1 January 2026. The costs are the best estimates at this stage and consultants have assisted in producing the estimates. The best case and worst case scenarios are based on the mid-range with a +/- 10% change 2,231 2,746 2,746 2,746 2,746 2,479 3,051 3,051 3,051 3,051 2,727 3,356 3,356 3,356 3,356 Roads & Infrastructure Services Bus Transport contracts have seen a siginificant increase in new contract prices due to increased costs for fuel, insurance, maintenance, regualtory compliance and driver wages. New contracts have seen a combined annual increase of £975k across Argyll and Bute during 2024-25 with further contract renewals due in 2025-26. The cost pressure is the best estimate of future renewals and expected increases. An options appraisal is currently being carried out to assess the best and most cost effective solution for future delivery of the school and public transport service. 268 268 268 268 268 268 268 268 268 268 268 268 268 268 268 Executive Director - Kirsty Flanagan ICT Migration from Skype for Business to Teams Telephony to ensure those staff who need to make and receive external calls can do so. This was agreed at Policy & Resources Committee on 15 August. 19 282 282 282 282 63 300 300 300 300 108 318 318 318 318 Council Wide Council Wide A letter from the Dunbartonshire and Argyll and Bute Valuation Joint Board was received on 30 January 2025 advising of the financial challenges facing the Board and the estimated 2025-26 to 2027-28 budget gaps along with a request to increase the level of contribution that we make to the Board. Since 2012-13 the core constituent funding to the Board has either reduced or been flast cash for the past 7 years with the Board heavily reliant on reserves. As the reserves will be fully depleted by 2025-26 there is a required for the requisitions to increase. 255 301 301 301 301 255 301 301 301 301 255 301 301 301 301 Council Wide Council Wide General provision for unidentified Cost and Demand Pressures 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500 1,000 2,000 3,000 4,000 5,000 TOTAL 3,321 5,016 4,979 5,269 5,559 3,863 5,888 6,078 6,618 7,158 4,656 7,305 7,975 9,015 10,055 Best Case Mid-Range Worst Case APPENDIX 2
Page 17
SOCIAL WORK COST AND DEMAND PRESSURES - 2026-27 to 2028-29 APPENDIX 3 Service Cost/Demand Pressure 2026-27 £000 2027-28 £000 2028-29 £000 2026-27 £000 2027-28 £000 2028-29 £000 2026-27 £000 2027-28 £000 2028-29 £000 All Social Work Estimated Pay inflation reflecting a best case at 3% up to 2027/28 reflecting the Scottish Government Public Sector Pay Policy before reducing to 2% in 2028/29, a mid-range of 3% and a worst case of 5%. Adjusted for the impact of the increase in the employer's pension contribution rate from 6.5% to 17.5% in 2026/27. 1,232 2,501 3,373 1,232 2,501 3,809 2,054 4,210 6,474 All Social Work Estimated Pay increments, best case is that 50% of the incremental changes based on 2025/26 are absorbed and in the mid-range and worst case, the increase is in line with the increase in 2025/26. 99 198 297 198 396 594 198 396 594 All Social Work Inescapable non-pay inflation across a range of activities and activity specific inflation rates with a 0.5% tolerance for the best and worst cases. 541 1,102 1,680 681 1,388 2,126 817 1,675 2,577 All Social Work Non-pay inflation impact of payroll inflation on NHS posts which are recharged to Social Work. 75 151 230 90 182 277 104 213 325 Adult Care Older People Demand Growth: The number of older people is increasing and older people are living longer with significant health and support needs and significant expectations of the support they are entitled to receive. Best case assumes that this will be offset by efficiency improvement and increasing unmet need / demand. The mid range allows for a 1.5% increase each year. Worst case is 3% per year on the older adult services budget. 0 0 0 500 1,000 1,500 1,000 2,000 3,000 Adult Care Mental Health Demand Growth - As above, services operating within budget overall. The best case assumes a 0% increase in spending reflecting the limited service capacity in the area, the mid-range reflects 2% growth in 26/27 and 27/28 and the worst case reflects 3% growth. 0 0 0 50 100 150 75 150 225 Children and Families Looked After Children Demand Growth - there is a continuing demand for placements of children who are cared for by the HSCP. The best case scenario is that the expected additional demand can be funded from within existing resources as a result of planned improvements to the service delivery model (eg shift away from high cost external residential care to local foster and kinship care), the mid case reflects that additional demand in 26/27 be funded from existing resource with £250k per annum thereafter and the worst case reflects £250k per annum. 0 0 0 0 250 500 250 500 750 All Social Work Allowance for unknown cost and demand pressures which could arise. Per James Gow this is to reduce to £200k pa 0 0 0 200 400 600 200 400 600 TOTAL UNFUNDED COST AND DEMAND PRESSURES 1,947 3,952 5,580 2,951 6,217 9,556 4,698 9,544 14,545 Worst CaseMid RangeBest Case